Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
195-154
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, September 15, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC G-21 PRUDHOE BAY UNIT G-21 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/15/2022 G-21 50-029-22604-00-00 195-154-0 N SPT 8634 1951540 2158 2691 2757 2698 2669 9 10 10 9 OTHER P Bob Noble 8/30/2022 2 year MIT-TxIA as per CO736; second try. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT G-21 Inspection Date: Tubing OA Packer Depth 283 2754 2696 2667IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN220902190412 BBL Pumped:2.5 BBL Returned:2.5 Thursday, September 15, 2022 Page 1 of 1 9 9 99 9 9 9 à 99 9 9 9 99 9 9 9 MIT-TxIA second try. James B. Regg Digitally signed by James B. Regg Date: 2022.09.15 15:22:03 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, September 15, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC G-21 PRUDHOE BAY UNIT G-21 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/15/2022 G-21 50-029-22604-00-00 195-154-0 N SPT 8634 1951540 2158 637 2752 2668 2621 9 9 10 10 OTHER I Bob Noble 8/30/2022 2 year MIT-TxIA as per CO736; test determined to be inconclusive. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT G-21 Inspection Date: Tubing OA Packer Depth 198 2746 2663 2616IA 2583 10 45 Min 2580 60 Min Rel Insp Num: Insp Num:mitRCN220902185045 BBL Pumped:4.7 BBL Returned:4.7 Thursday, September 15, 2022 Page 1 of 1 9 9 9 9 9 9 9 9 9 9 9 9 9 ,QFRQFOXVLYHGXHWRSUHVVXUHORVVGXULQJQGPLQLQWHUYDORIWHVWMEU 9 MIT-TxIA as per CO736; ,QFRQFOXVLYHGXHWRSUHVVXUHORVVGXULQJQGPLQLQWHUYDORIWHVWMEU James B. Regg Digitally signed by James B. Regg Date: 2022.09.15 15:16:42 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, September 15, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC G-21 PRUDHOE BAY UNIT G-21 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/15/2022 G-21 50-029-22604-00-00 195-154-0 N SPT 8634 1951540 2158 2148 2771 2733 2715 8 10 8 9 OTHER P Bob Noble 8/30/2022 2 year MIT-T as per CO736. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT G-21 Inspection Date: Tubing OA Packer Depth 189 267 276 280IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN220902185924 BBL Pumped:0.5 BBL Returned:0.5 Thursday, September 15, 2022 Page 1 of 1 9 9 9 9 9 9 99 9 9 9 9 9 9 9MIT-T a James B. Regg Digitally signed by James B. Regg Date: 2022.09.15 15:19:24 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, August 25, 2020 TO: Jim Regg SUBJECT: Mechanical Integrity Tests P.I. Supervisor Hilcorp North Slope, LLC G-21 FROM: Guy Cook PRUDHOE BAY UNIT G-21 Petroleum Inspector Sre: Inspector Reviewed By: P.I. Supry Jr*— rNON-CONFIDENTIAL NON-CONFIDENTIALComm Well Name PRUDHOE BAY UNIT G-21 API Well Number 50-029-22604-00-00 Inspector Name: Guy Cook Permit Number' 195-154-0 Inspection Date: 8/23/2020 Insp Num: mitGDC200823173230 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well G 21 T� In Test psi -- N ITVD 8634 Tubing 747 2661 2591 2568 19slsao Type Test -- PTD yp SPT p 2158 5 IA 771 1 939 967 974 — - -- - - BBL Pumped: 1.BBL Returned: L4OA 13 1 14 13 13 . Interval OTHER PI P Notes: 2 year MIT -T per CO 736 (cemented IA). Testing was done with a Little Red Services pump truck and calibrated gauges. Tuesday, August 25, 2020 Page 1 of 1 MEMORANDUM TO: Jim Regg P.I. Supervisor FROM: Guy Cook Petroleum Inspector Well Name PRUDHOE BAY UNIT G-21 Insp Num: mitGDC200823172718 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, August 25, 2020 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC G-21 PRUDHOE BAY UNIT G-21 Src: Inspector Reviewed By: P.I. Supry. J ---:P— Comm API Well Number 50-029-22604-00-00 Inspector Name: Guy Cook Permit Number: 195-154-0 Inspection Date: 8/23/2020 ' Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min PTD 1951540 Type Test 8634 Tubing 750 2650 2588 2560 -T 3 Well G-21 Type In N 'TVD g i 'I YP J :Test psi IA 2563 _J _ II SPT. 2158.5 - ii 632 2684 2598 BBL Pumped: 3 - IBBL Returned: 3 OA 13 14 14 14 Interval OTHER Ip/F P Notes: 2 year CMI -TSA per CO 736 (cemented IA). Testing was done with a Little Red Services pump truck and calibrated gauges. Tuesday, August 25, 2020 Page 1 of 1 7 r tioFT4 wP�� , THE STPE • Alaska Oil and as 0fLS�E�CA � Conservation C®YT1IllISS1O n 5 == 333 West Seventh Avehue 1,2 trijt _ jpo GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 0.A'ALASFax: 907.276.7542 www.aogcc.alaska.gov Jaime Bronga Wells Interventions Engineer SCANNED BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-21 Permit to Drill Number: 195-154 Sundry Number: 318-111 Dear Mr. Bronga: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants forgood cause shown,aperson affected itmay e by file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd dayfalls on a holidayor weekend. Sincerely, Hollis S. French k1 Chair J DATED this 4 day of May, 2018. 4 .AYQ sk Vd3g M � D RECEntgp STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION C SSION P 1 5 Si 44 l APPLICATION FOR SUNDRY APPALS �R 1 2018 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Repair Well 0OK y Suspend 0 Perforate p Other Stimulate 0 Pull Tubing 0 Chang A ie2tP-�. gra Plug for Redrill 0 Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other IA Squeeze 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 195-154 • Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 0 • 3 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-22604-00-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No 0 ' PBU G-21 • 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028280&028285 PRUDHOE BAY,PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): Junk(MD): 13359 • 9009 • 10151 8981 10151,10162,10525 Unknown,12250,1326$ Casing Length Size MD TVD Burst Collapse Structural Conductor 78 20" 35-113 35-113 1490 470 Surface 3474 9-5/8" 35-3509 35-3497 5750 3090 Intermediate 10569 7" 33-10602 33-9038 7240/8160 5410/7020 Production Liner 2918 4-1/2" 10441-13359 9032-9009 8430 7500 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10040-13240 8916-9006 4-1/2"12.6# 13Cr80/L-80 31 -9880 Packers and SSSV Type: 4-1/2"Baker S-3 Packer Packers and SSSV MD(ft)and ND(ft): 9666/8637 4-1/2"Baker S-3 Packer 9822/8754 12.Attachments: Proposal Summary 0 Wellbore Schematic p 13.Well Class after proposed work: • Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 Service ❑' 14.Estimated Date for Commencing Operations: April 1,2018 15. Well Status after proposed work: Oil 0 • WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Bronga,Jaime be deviated from withoutrior written a roval. P PP Contact Email: Jaime.Bronga@bp.com Authorized Name: Bronga,Jaime Contact Phone: 9075644151 Authorized Title: Well erventions Engine Authorized Signature: /Date:.311w I L// COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Number: i',4 17) - I11 Plug Integrity 0 BOP Test 0 Mecheiii i integrity i est a Location Clearance 0 Other: . kl a/ 1c/c I-vf a 0 i-i va / Paip"-i a r _TA- C Cs.„,-,t.--,r Sg v<f (-5 , 0 5G/1'L T r,`v r l'.° it f'v ra y-i v� �Gvi rw re-5v!!3 F p )a 7 54-C4w! A e 6 Levi trrm /:) firqty vi' )viorq. tv�-hqY//I.-QrJ. RostinitiaLloieetieR MIT Req'd? Yes No ❑// ✓ ✓ Spacing Exception Required? Yes 0 No 61 Subsequent Form Required: /0 4r N dpi. J � APPROVED BYTHE Approved by: �► COMMISSIONER COMMISSION Date: 5 i 4 de., 1/71 5/2./18 _`� ORIGINAL RBDMS'% . MAY 0 8 2018', bc Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicat • • tap Well: G-21 G-21 Cement Job Intervention Engineer Jaime Bronga 907-564-4151 Production Engineer Joleen Oshiro 564-4606 Reservoir Engineer Vivek Peraser 564-5306 History G-21 is an Ivishak producer shut in due to high gas rate and has no remaining value in the Ivishak. A Sag add perforation opportunity has been identified. The top of Sag_ is located at 9398'md in this well, above the production packer. This program requests to add cement to the annulus above the packer to become the primary barrier to the reservoir. This sundry requests approval for a total of -700'md of cement in the IA and -500' of cement above the Top of Sag. This is to prevent IA repressurization from potential cement channels through the Sag added perforations. Objective Add perforations to the Sag. Expected Start Date: April 1, 2018 Post-Job Evaluation This well is a gas lifted producer; an AA will not be applied for. The following BP internal criteria to evaluate the integrity of the non-rig workover will be applied: • CMIT-TxIA • SCMT �- reiet-✓ rr5vl-5 w/ RG LZ cc Pri`or to � crf'�r� / ,'r,� Say • MIT-T Long-Term Integrity Monitoring /14 cfizc`,,?7 C • Record WHPs daily (includes pressure monitoring of the Inner Annulus to be cemented to -8875'MD). • 2 year (biannial) M1f-TxlAs and MIT-Ts Integrity Screening C wb I l o P- TIFL passed - 1/14/15 MIT-T passed -9/16/11 MIT-IA to 3000psi passed - 1/23/2010 TIO Plot • 0 380 —.-- _220 3.000 ■ • . 3,400 3200 3.000 -180 TIO Plot 2.800 -160 2.600 --- -Tbg 2.404? • -140 i..__IA 2.200 . - -' -♦-OA 1.80ti,,.J- lI r- . 1 fuel 4 000A :12006:48r0:4 6Gi', • U.� I i Ir �' .100® On aA t • ■ Bleed 80 l +I� Operable 12{;D • 1 � I .i Notoper 1.000 • :60 ♦ Under Eval 300 ' I • Temperature 400 1- Px 2E0 jl. r ._ 03,0114 OM " - - 081:7:f 5 121805 0321716 00+22•00 302306 *225116 032807 0625+17 592217 016,1a H/'h.ccf w(4S Gtui1i,tnin 1') 2-4 IPr?""5- 2 tvll/ Sy 1 Procedure Slickline 1. Dummy GLVs. MIT-T. , m 'T 2. Pull St 1 from 9572'md. 1 Eline 3. Set CBP at 9609'md. CMIT-TxIA. X �N 4. Set Cement Retainer at 9542'md. u ��M G1Y`rJ Coiled Tubing 5. Sting into cement retainer and circulate -14 bbls of Class G cement into the IA to get the TOC in the IA up to -8875'md. Cement design parameters are below. Fullbore Ate" C An.cr- -/-)k i A ° ' „Sf c -fe W!'/ri ts5 rcli 6. CMIT x1A to 2500psi Vf`� 7. MIT-T to 2500psi Slickline 8. SCMT to confirm TOC. 9. Set live design. Eline 10. Perforate Sag based on reviewed SCMT data �ri.-- Operations 11. Put well on Production. Proposed Cement Blend Parameters Blend: Cement Type/Weight: Class G 15.8ppg. Batch Mixed. Field Blend to be +/- 0.1 ppg Slurry Temperature: Between 80 and 110 deg F API Fluid Loss: 40-200 cc Compressive Strength: 2000psi in 48 hrs Thickening Time: Minimum 6.5 hrs 2 • Activity Time (hrs) Shearing time, quality control, PJSM 1 Cement Displacement 1 Cement Contamination 2 Safety 1 Min Required Thickening Time 5 Ramp: Time Temp Pressure 0:00 90 0 1:00 180 4000 2:00 190 4000 3:00 200 4000 4:00 200 4000 7:00 200 4000 15:00 200 3500 3 • Current Schematic: • TREE= 4"CAMERON -2 SAFETY NOTES:""4-1/2"CHROME TBG**" WELLHEAD= FMC ACTUATOR= BAKER KB.ELEV= 70.05' BE ELEV= 38.4' KOP. 4529' Max Angle= 96 10683' ' II 2211' —{4-1/2"HES X NIP,ID=3.813" Datum MD= _— 9975' Datum TVD= 8800'SS GAS LIFT MANDRELS 9-5/8"CSG,40#,NT-80,ID=8.835" H 3509' I---1 ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3408 3396 0 KGB2 DOME BK 16 09/19/11 L 3 6121 5917 39 KGB2 SO BK 20 09/19/11 2 8412 7666 42 KGB2 DMY SBK-2 0 08/16/06 1 9572 8566 40 KGB2 DMY SBK-2 0 08/16/06 I I 9641' -I4-1 2"HES X NIP,ID=3.813"J Minimum ID=3.725"@ 9685' 4-112" HESXN NIP E $ 9662' H7"X4-1/2"BKR S-3PKR,ID=3.875" I I I 967-1T-1-14-1/2"HES X NIP,ID=3.813" • 4-. 1/22 TBG,12.3. I—I 13-CR80 VAM TOP, 9738' I- 1.........,> 0152 bpf,ID=3.958" 9758' —I7'X4-1/2"UNIQUE OVERSHOT, [TUBING STUB H 9751' I I 9812' H4-1/2"HES X NIP,ID=3.813" I 17"CSG,26#,L-80.ID=6.276" H 9838' `g $ I 9822' H7"X 4-1/2"BKR S-3 PKR,ID=3.875" / TOP OF 7"CSG H 9838' I I I 9845' H4-1/2"HES X NIP,ID=3.813" I I 9685' —I4-112"HES XN NIP,ID=3.725" I I4-1/2"TBG,12.64,L-80,.0152 bpf,ID=3.958" H 9878' 1----+ $ 9878' I—H4-1/2"WLEG,ID=3.958" 10151' EST CEMENT TOP(08/25/11) 10162' —14-1/2"POSISET PLUG(08/26/11) iiiMit--"H TOP OF 4-1/2"LNR 10441' g--I 10451' H7"X 4-112"T1W HYDRO PKR,ID=3.875" I Mil 10525' HHESEZDRILLCIBP(09101/09) I 17"CSG,26#,L-80,ID=6.276"H 10602' I—a 11. PERFORATION SUMMARY ` ? H FISH-IBP DEBRIS(8/17/06 RWO) REF LOG:SPERRY SUN NNVD ON 10/95 ANGLE AT TOP PERF:49°@ 10045' • Ilk,. 12250' H OBP JUNK LEFT 02/17/02 I Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL OPN/SQZ DATE • Ilt 3-3/8" 6 10040-10045 0 11/19/11 3-3/8" 6 10045-10050 0 09/23/11 13263' —FISH-4-1/2"HALIBURTON CIBP 3-3/8" 6 10234-10264 C 09/01/09 2-3/4" 4 10790-11075 S 10/16/99 MLL LOOSE-PUSH TO BTM 2-112" 4 11850-12150 C 02/17/02 3-3/8" 6 12580-13240 C 02/13/96 PBTD —I 13272' as aaa;a 1111:4%* *`:4%*> I4-1/2"LNR,12.6#,L-80,.0152 bpf,ID=3.958" H 13359' ti �a .a4,0 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/13/95 ORIGINAL COMPLETION 09/20/11 JCM/PJC POSISET/CMT PLUG(8/28/11) WELL: G-21 08/17/06 NORDIC 3 RWO 09/20/11 SET/PJC GLV C/O(09/19/11) PERMIT No:'1951540 08/30/06 JCM/PJC GLV 0/0 09/23/11 TT.N/PJC ADPERFS(09/23/11) API No: 50-029-22604-00 10/22/06 MS/PJC DRLG DRAFT CORRECTION 12/16/11 SRD/PJC ADPERFS(11/19/11) SEC 12,T11 N,R13E,2911'FSL&2368'FEL 10/01/09 TAR/SV SET OBP/ADPERF(09/01/09) 02/02/10 RCT/PJC GLV C/O(01/23/10) BP Exploration(Alaska) 4 Ill 0 IA Cement Job Schematic: .,. .,., ,. 1 sAi Er,Iv-J-ts-4 1 i'r,..11..301"."E,T61,,---- G-2 1 ,.,....%,,,.,...= rs 7 ,nr.ft z, f o22114k°°' HA-1,r 1-4Bsx1,,,P U.3413'1 a / f (.,..s.L.fr,m,,okus H 9 I-I ilk -1 &U. Pi'D DEV "YFt. VLV LP.T0.1 PCf-t- L1A TS.±.5.-f... G 40.1.1 NT 90 0,4•&11,- 3SOW A 4 1-4(v ,,.% C KG6k2 VOW BK 16 c-a ra i IF ' 6(.432 SO Bo( 2o o9toet os4 e F 1.31g 4422'74 4,3.10-01, Eslionoteel TCK oft :0', '034,2 0 0..k. ot3 r PC 9$071ffig 11111 1 BS:. ...; KGB2 AK.2 0 08,16,06 Tv c 7-5 fAtill , 964i' .--i 4-SXN40 0,1/)13-1 abatic ' lc Minimum II) = 3 725",e4)9685' 1415 • 4412HES X N NIP 1.71.-4 1.14 9662. I_{--• ..,riie?C,=,1P r. ,,rr I To C 5%4- i.--::J-4-6e4s FOC 4, eq,b0 V'e 7,perF 4 1,2-TBG .2 Rt i3-CR40 1/404/4 ICP --.1 9738' 0 T'S2 N..0" 0 J 96S- Pr- i 97.54 -I . J 1.--""7-071 URI4G,SrLB 9751' III 961.2" -, i 1 I7-t... 0.3. 26., ...If 1 0"6 276- H 993r I 0.14 0=4 9822 - ,' . -- - I I TCP Cot T-CSG H 9935. I 111 111 9845* H. . -_,..s.,..,,P 0 9595- H4-1,7*,..5.-;.- . %-• II 4 1,2-TBO 126,0 L 40 0.52 tk.,,* 104 3 96p- 9878 987W 4 1 2"NI EC., 10151 EST CLAN.'TOP J nii.41,11, ..........,......m0501 --- --- 1.0166 1"CP Of 4 " .',,j—i 10441111K .1 —1 10451" H- X 4 I 7-11,A were°44.3,LO. 3 VS* I 1—F-7-105Z .,- -5-71-1,,n.'...-.7.eLL c . 43-t' ,S1 J Mt PUIFOR4 TON SL4.10AKY ? FirS), Fr'XIRISIR'71N,1'40 el Fra LOG SK.14111Y Wit 114W0 ON 9396 ANGLE AT FOP PERF 49-421004S - 12254Y .BP...,..Nic.Er T[72 1r 02 66.16, tiii-tip IpProduction 0131de luitor441a4r10414 1111", O64143.2 - - IMO J 10046 0 10049 10066 C, ---1326.3" -- 7- - - .6 10234-1,a2B4 C 0...,*o Ery . 4 10791 11011'. S • • .C116, 4,....414116 _114:1114.11,6 ...71,7 ' i ,. ,- • OP'CASA,.CilvPLE- r:, j, ' * ..,....0 ' ;,U..L. Gi21 - . s i - PERINI No Fig,simo 1 , • r-rw r, . • AFI WI 50-02V-2-2604 Al 1 •J,,Eol2 F1161 R11£2911"FSL&2M"FE Bp E„g,icie2n-un!Atka kai 5 • • Future P&A Plan: TREE= 4"CAMERON 1 SAFETY NOTES**4-112"CHROME TBG*** WELLHEAD= FMC ACTUATOR= BAKER KB.ELEV= 70.05' v&Uz' t :r .at BF.ELEV= 38.4' KOP= 4529' Max Angle= 96 @ 10683' I 2211• H4-1/2"HES X NIP,ID=3.813" I Datum MD= __ 9975' Datum TVD= 8800'SS GAS LIFT MANDRELS STI MD 1 TVDI DEV TYPE VLV I LATCH)PORTI DATE 9-518"CSG,40#,NT-80,ID=8.835" H 3509' HA 4 3408 3396 0 KGB2 DOME BK 16 09/19/11 ' 3 6121 5917 39 KGB2 SO BK 20 09/19/11 2 8412 7666 42 KGB2 DMY SBK-2 0 08/16/06 1 9572 8566 40 KGB2 DMY SBK-2 0 08/16/06 9641' —14-1/2"HES X NIP,ID=3.813" I Minimum ID =3.725"@ 9685' 4-1/2" HES XN NIP .17 9662' —17"X4-1/2"BKR S-3 PKR,ID=3.875" I 9686' —14-1/2"HES X NIP,ID=3.813" I 4-1/2"TBG;12.64,13-CR80 VAM TOP, I 9738' I 975 H 7X4-112"UNIQUE OVERSHOT .0152 bpf,ID=3.958" TUBING sTUB 9751' I 9812' 1-14-1/2"HES X NIP,ID=3.813" I 7"CSG,264,L-80,ID=6.276" H 9838' I `$ 1-� 9822' ,'�7"X 4-112"BKR S-3 PKR,ID=3.875" I TOP OF 7"CSG H 9838' I I 9845' —14-1/2"HES X NIP,ID=3.813" 9685' H4-1/2"HES XN NIP ID=3.725" I 4-1/2"TBG,12.6#,L-80,.0152 bpf,ID=3.958" H 9878' I 9878' --I4-1/2"WLEG:ID=3.958"I 10151' HEST CEMENT TOP(08/2,5/11) I 10162' H4-1/2"P'OSISET PLUG(08/26/11) TOP OF4-1/2"LNR 10441' 10451' 7"X4-1/2"11W HYDRO PKR,ID=3.875" 10525' RHES I DRILL CIBP(09/01109) I 7"CSG,264,L-80,ID=6.276" H 10602' I--a PERFORATION SUMMARY ? H FISH-IBP DEBRIS(8/17106 RWO) REF LOG:SPERRY SUN MWD ON 10/95 ANGLE AT TOP PERF 49°@ 10045' 12250' GBP JUNK LEFT 02/17/02 Note:Refer to Rroduction DB for historical perf data SIZE SPF IN I LRVAL OPN/SQZ DATE 3-3/8" 6 10040-10045 0 11/19/11 3-3/8" 6 10045-10050 0 09/23/11 3-3/8" 6 10234-10264 C 09101/09 13263' —FISH-4-1/2"HALIBURTON CIBP 2-3/4" 4 10790-11075 S 10/16/99 MILL LOOSE-PUSH TO BTM 2-1/2" 4 11850-12150 C 02/17/02 3-3/8" 6 12580-13240 C 02/13/96 PBTD —I 13272' 414 a �, I4-1/2"LNR,12.6#,L-80,.0152 bpf,ID=3.958" 13359' A*es DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11113/95 ORIGINAL COMPLETION 09/20/11 JCM/PJC POSISET/CMT PLUG(8/28/11) WELL. G-21 08/17/06 NORDIC 3 RWO 09/20/11 SET/PJC GLV C/O(09/19/11) PERMIT No: 1951540 08/30/06 JCWPJC GLV C/O 09/23/11 TTW/PJC ADPERFS(09/23/11) API No• 50-029-22604-00 10/22/06 MS/PJC DRLG DRAFT CORRECTION 12/16/11 SRDIPJC ADPERFS(11/19/11) SEC 12,T11 N,R13E,2911'FSL&2368'FEL 10/01/09 TA R/SV SET GBP/ADPERF(09/01/09) 02/02/10 RCT/PJC GLV C/O(01123/10) BP Exploration(Alaska) 6 • • • Loepp, Victoria T (DOA) From: Bronga,Jaime <Jaime.Bronga@bp.com> Sent: Wednesday,April 11, 2018 11:19 AM To: Loepp,Victoria T (DOA) Subject: RE: PBU G-21(PTD 195-154, Sundry 318-111)IA Squeeze with Sag Perforation/cement packer Hi Victoria, Thanks for following up. See answers in red below. Jaime From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@ alaska.govJ Sent: Tuesday, April 10, 2018 9:04 AM To: Bronga, Jaime Subject: PBU G-21(PTD 195-154, Sundry 318-111) IA Squeeze with Sag Perforation/cement packer Jaime, A few questions: 1. How was the TOC of the 7" production casing of 8400' MD determined? Was a cement evaluation log run or is the TOC calculated? What is the TOC(calculated)assuming 30%wash out? ._alculated with 30%washout. 2. Does the OA have any cement/cement shoe? No,the OA has an Open shoe. 3. What is the cretaceous stratigraphy? OP: UG4 is estimated to be at 4423'MD,-4340'TVDss±15'MD BTM:We•t Sak/Schrader 6341'MD,-6019'TVDss ±30'MD Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.LoeDD ar7alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservati.n Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it o you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp@alaska.gov 1 • • >C00 v, , Thousand Cubic Feet of Gas ("MCF") per Month 0o 0 or Gas-Oil Ratio 0 O O Co ^n O O O O ON O O o O 0 1 O o O O 0 0 N .moi .-1 ai -1 4" ri -, -, L j 1 Lil 1IPII I 1 L 1 Il . . °�°-o„ of N o I a) ni r N ._d • € ° op 0,0 CT) rq ri • l � I 5iLE!:rr ►? sro o o 0000 e4� uI o Z E . LI .94°,..1 -7.-, 0 3. 0 a I 444 a rq INo o0 a J �w..v.a� r w Q LJJ v, a a, ® . ° o . w f w ot _ _ � a o _ o 0 D C CI c � da < _, 00 00 % _ a _ 0 cc u _. 4, 090 °8 a CL o _. ° ° Q a. -` 8 ° • o.° U W C .. .. 11 . • Z Q �O CCC 4A1111111 $o _ _". I � oo lii 04° 'I, P�Q _ o — °00o ° reoa VI ICE 144,11 a a aaa1111 I 1/Q c a e __ ° 0p ° °m1/40 1 d° s �e • a I 0 °le ' Z r,4' I I 11% .1 10 a a O O 111 , _.._ 0 0 00 ° 7 MO m o O J aa m 0 °" ma \ ag Lu 1 14d O O0. O m I I ill s o0 0 0 0 0 0. 0- �sl too 0 0 0 0 0 '-, 6 6 6 6 .-i O 0 0 r, O 0 a-, 6 a-1 c-, yluo j .1ad JaleM jo wiles JO glum Jad no Jo wiles • • pc31„,t. Prs) )`151 540 Regg, James B (DOA) From: Herrera, Matthew F (DOA) Sent: Sunday, November 5, 2017 3:41 PM 2��"1,�, +� (1111 To: Regg, James B (DOA) �� Subject: RE: PBU G-Pad Deficiency Report Attachments: G-Pad WH Signs .zip Went by G-Pad and all wells in question had the well house signs replaced with ones with PTD numbers. From: Regg,James B (DOA) Sent:Thursday, November 2, 2017 8:57 AM To: Herrera, Matthew F (DOA) <matthew.herrera@alaska.gov> Subject: RE: PBU G-Pad Deficiency Report Please confirm that these well signs have been installed. Deficiency rpt attached so you know which wells. Jim Regg Supervisor, Inspections AOGCC 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-793-1236 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907- 793-1236 or iim.regg@alaska.gov. From:AK, OPS FF Well Ops Comp Rep [mailto:AKOPSFFWelIOpsCompRep@bp.com] Sent: Monday, September 25, 2017 8:59 AM To: Herrera, Matthew F (DOA) <matthew.herrera@alaska.gov>; Regg,James B (DOA) <jim.regg@alaska.gov> Cc:AK, OPS GC1 Field O&M TL<AKOPSGC1FieldOMTL2@bp.com>; AK, OPS GC1 Wellpad Lead <AKOPSGC1WellpadLead@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWeIlOpsCompRep@bp.com> Subject: PBU G-Pad Deficiency Report Matt and Jim, Enclosed is the completed Deficiency Report. The Well House signs have been ordered and are scheduled to ship to the Slope on Tuesday 9/26/17. Upon arrival we will schedule install. Reference the below email from our Data Controller to verify the sign orders. Please call with any questions or concerns that you may have. Vince 1 p M '" So so s.,:., . 4.--m=10.---: ...... ... ... .. .... ., 0 ,._.: , .. :,,„„.„ _,,,, . 4 ,,, ._ ... ,....__5 .„ _ . .,, _ IP". ._„_. _.„.t 0 C\ „„X. .'" `_ 1 , II -:,. I c _.... _ < ... t.-- ... . N •^ (MED >0 .! ... - :, *r • ■ " ...., .... •-• VS ., w C114 . MINI Uliill Z g 0 11119, l'.. ... _ __... tin: t Z . 1 . -ii,'' — —pZ Z — 0 it ... .,,,, 0 c < ^ _ n • Regg, James B (DOA) From: AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com> Sent: Friday, October 13, 2017 1:40 PM To: Herrera, Matthew F (DOA); DOA AOGCC Prudhoe Bay '7:2, Cc: AK, OPS FF Well Ops Comp Rep I WIT 10/13/ 7 Subject: RE: PBU G-Pad Deficiency Report Matt I was going through some emails and I couldn't find us fully closing out to the completion of the E-Pad wellhouse sign install from the deficiency report you initiated. Therefore, to ensure you have, please be advised that all 8 WH signs have all been installed. Lee Hulme Well Ops Compliance Rep BP Exploration (Alaska) Inc. Office: (907) 659-5332 Cell: (907) 229-5795 Harmony— 7187 (Alternate: Vince Pokryfki) From: Herrera, Matthew F (DOA) [mailto:matthew.herrera@alaska.gov] Sent: Monday, September 25, 2017 9:01 AM To: AK, OPS FF Well Ops Comp Rep Subject: RE: PBU G-Pad Deficiency Report Thank you Sir From:AK, OPS FF Well Ops Comp Rep [mailto:AKOPSFFWellOpsCompRep@bp.com] Sent: Monday, September 25, 2017 8:59 AM To: Herrera, Matthew F (DOA) <matthew.herrera@alaska.gov>; Regg,James B (DOA) <jim.regg@alaska.gov> Cc:AK, OPS GC1 Field O&M TL<AKOPSGC1FieldOMTL2@bp.com>; AK, OPS GC1 Wellpad Lead <AKOPSGC1WellpadLead@bp.com>; AK, OPS FF Well Ops Comp Rep<AKOPSFFWellOpsCompRep@bp.com> Subject: PBU G-Pad Deficiency Report Matt and Jim, Enclosed is the completed Deficiency Report. The Well House signs have been ordered and are scheduled to ship to the Slope on Tuesday 9/26/17. Upon arrival we will schedule install. Reference the below email from our Data Controller to verify the sign orders. Please call with any questions or concerns that you may have. Vince Vince Pokryfki Field Well Compliance Advisor 1 • • Regg, James B (DOA) From: AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com> Sent: Monday, September 25, 2017 8:59 AM To: Herrera, Matthew F (DOA); Regg,James B (DOA) Cc: AK, OPS GC1 Field O&M IL;AK, OPS GC1 Wellpad Lead;AK, OPS FF Well Ops Comp Rep Subject: PBU G-Pad Deficiency Report Attachments: Deficiency Report PBU G-Pad.xlsx Matt and Jim, • Enclosed is the completed Deficiency Report. The Well House signs have been ordered and are scheduled to ship to the Slope on Tuesday 9/26/17. Upon arrival we will schedule install. Reference the below email from our Data Controller to verify the sign orders. Please call with any questions or concerns that you may have. Vince Vince Pokryfki Field Well Compliance Advisor BP Exploration (Alaska) Inc. PBOC - B103 Office: (907) 659-5332 Cell: (907)354-1352 Harmony - 7187 Alternate:Lee Hulme From: Lastufka, Joseph N Sent: Friday, September 22, 2017 4:19 PM To: AK, OPS FF Well Ops Comp Rep Subject: RE: PBU G-Pad Deficiency Report Ordered. Could possibly be ready on Monday. I'll keep you posted. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 1 • • i:: ak Pi ,„,,,,,,,,: .,,_ `, C BP Exploration AlaskaI900 E. Benson Blvd.IRoom: 788DIAnchorage, AK From: AK, OPS FF Well Ops Comp Rep Sent: Friday, September 22, 2017 1:21 PM To: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Cc: AK, OPS GC1 Field O&M TL<AKOPSGC1FieldOMTL2@bp.com>; AK, OPS GC1 Wellpad Lead <AKOPSGC1WellpadLead@bp.com>; AK, OPS FF Well Ops Comp Rep<AKOPSFFWeIIOpsCompRep@bp.com>; Cocklan- vendl, Mary E<mary.cocklan-vendl@bp.com>; Pomeroy, Glen<GIen.Pomeroy@bp.com> Subject: FW: PBU G-Pad Deficiency Report Joe, Can you please order new well house signs for the following G-Pad Wells: G-4, 5, 17, 19, 21, 23, 26, 31. Please utilize the bottom hole locations and Permit numbers found in DWF. GC1 Team, Once the signs arrive please ensure that they are installed asap as this is a "Compliance Issue"with a formal Deficiency Report submitted from the AOGCC. Thanks for the help, Vince Vince Pokryfki Field Well Compliance Advisor BP Exploration (Alaska) Inc. PBOC - B103 Office: (907) 659-5332 Cell: (907)354-1352 Harmony- 7187 Alternate:Lee Hulme From: Herrera, Matthew F (DOA) [mailto:matthew.herrera@alaska.gov] Sent: Friday, September 22, 2017 11:44 AM To: Regg, James B (DOA); AK, OPS FF Well Ops Comp Rep Subject: PBU G-Pad Deficiency Report These were found during SVS testing on pad yesterday Nate gviftet4 Petroleum Inspector 2 • • Alaska Oil & Gas Conservation Commission Matthew.herrera a alaska.gov 907-659-2714 (Slope Office) 907-448-1227(Slope Cell) 907-953-7966 (Cell) 3 • \ • • State of Alaska Oil and Gas Conservation Commission Deficiency Report I(*(17 Location: PBU G-Pad Date: 9/21/2017 PTD: Multiple Operator: BPXA Type Inspection: SVS Operator Rep: Monty Owens Inspector: Matt Herrera , Position: Lead OP Op. Phone: 907-659-4084 Correct by(date): Op. Email: AKOPSGC1WellpadLead@bp.com Follow Up Req'd: Yes Detailed Description of Deficiencies Date Corrected Mutliple Wellhouse signs on the pad do not have the PTD numbers for that specific well. List of wells with deficient well house signs: PBUA 4,05,17,19,21,23,26 and31 Signs ordered on 9/22/17 and scheduled to ship to the BPXA North Slope on 9/26/17. 9/26/17 Sign install scheduled. See email concerning the Well House sign order. (dated: 9/22/17) ✓ Attachments: Monty Owens Operator Rep Signatures: Matt Herrera AOGCC Inspector *After signing,a copy of this form is to be left with the operator. Follow-up Instructions Return a copy of this Deficiency Report to AOGCC(Attention: Inspection Supervisor)within 7 days of receipt. Include the"Date Corrected" and attach supporting documentation for each corrective action implemented to address the deficiencies. If a follow-up inspection was performed by AOGCC, include the date and name of Inspector. Extensions for corrective actions taking longer than the"correct by" date must be requested and accompanied by justification(Attention: Inspection Supervisor). Documentation of deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority for follow-up action. Revised 2/2016 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 Mr. Jim Regg DAUG 0 7 2012 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue 5 -1Cq Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB G -Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad G that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) G-Pad Date: 03/05/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft ° bbls ft na gal G-01A 1931710 50029202140100 3.0 NA 3.0 NA 10.2 5/10/2010 G -02B 2081580 50029202170200 0.5 NA 0.5 NA 2.6 5/10/2010 G -03A 1970700 50029202210100 0.7 NA 0.7 NA 6.0 5/27/2010 G-04B 2061400 50029202250200 0.1 NA 0.1 NA 1.7 5/10/2010 G -05 1780970 50029203510000 0.0 NA 0.0 NA 0.0 5/10/2010 G-06A 2060120 50029203580100 0.6 NA 0.6 NA 5.1 5/12/2010 G-07 1790180 50029203590000 0.5 NA 0.5 NA 3.4 5/11/2010 G-08A 2061830 50029205810100 0.1 NA 0.1 NA 0.9 5/27/2010 G -09B 2071100 50029205820200 9.0 NA 9.0 NA 69.7 5/20/2010 G -10C 2060090 50029205530300 0.9 NA 0.9 NA 8.5 3/5/2012 G-11B 2080270 50029205830200 0.0 NA 0.0 NA 0.0 5/21/2010 G -12B 2031410 50029205970200 0.5 NA 0.5 NA 2.6 5/13/2010 G -13A 2001630 50029206000100 0.0 NA 0.0 NA Trace 5/12/2010 G -14B 2090680 50029206460200 0.7 NA 0.7 NA 5.1 5/22/2010 G -15B 2080650 50029206470200 26.0 4.0 0.5 7/16/2011 3.4 7/19/2011 G -16A 2090560 50029206430100 0.0 NA 0.0 NA Trace 5/22/2010 G -17A 2060760 50029206190100 21.4 4.0 0.6 7/16/2011 3.4 7/19/2011 G -18A 1990320 50029206200100 71.7 14.0 1.0 7/16/2011 8.5 7/19/2011 G -19B 2071240 50029215990200 0.0 NA 0.0 NA Trace 5/22/2010 ---- G -21 1951540 50029226040000 0.5 NA 0.5 NA 3.4 5/12/2010 G -23B 2091440 50029216800200 0.5 NA 0.5 NA 4.3 5/11/2010 G -24A 2060820 50029216710100 0.1 NA 0.1 NA 0.9 5/11/2010 G -25B 2070860 50029216520200 5.3 NA 5.3 NA 23.8 5/28/2010 G -268 2050480 50029216610200 2.0 NA 2.0 NA 6.8 5/11/2010 G -27A 2070310 50029216460100 0.5 NA 0.5 NA 2.6 5/30/2010 G -29B 2101410 50029216500200 2.8 NA 3.0 NA 17.0 5/13/2010 G -30C 2091510 50029216130300 1.0 NA 1.1 NA 5.1 5/30/2010 G-31B 2090310 50029216160200 0.8 NA 0.8 NA 6.0 5/21/2010 G -32A 1970010 50029216360100 0.8 NA 0.8 NA 3.4 5/21/2010 c95 — tS4 25- JAN -2 012 RECEIVE x , 2k342i WNW" , A I . ' 5873 Alaska Data & Consulting Services Y an Com P State of Alaska 2525 Gambol! Street, Suite 400 ' ®OR Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 A . ! age Attn: Christine Shartzer ATTN: Stephanie Pacillo 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD G -11B BINC-00051 RESERVOIR SATURATION TOOL LOG 7-Jul-11 1 1 K -05D BUTT -00010 MEMORY COMPENSATED NEUTRON LOG 26- Aug -11 1 1 04 -22AL1 BAUJ -00054 MEMORY COMPENSATED NEUTRON LOG 19- Nov -10 1 1 J -22A BJGT -00049 RESERVOIR SATURATION TOOL LOG 6-Jul-11 1 1 F -01A BINC -00049 RESERVOIR SATURATION TOOL LOG 5-Jul-11 1 1 Ili 11 -28A BRRJ -00017 RESERVOIR SATURATION TOOL LOG 27- Oct -11 1 1 H -26 BJGT-00062 RESERVOIR SATURATION TOOL LOG 22- Aug -11 1 1 07 -13C BD88 -00148 MEMORY COMPENSATED NEUTRON LOG 7- Aug -11 1 1 F-30 BINC -00048 RESERVOIR SATURATION TOOL LOG 4-J u1-11 1 1 H-04B BUTT-00033 MEMORY COMPENSATED NEUTRON LOG 6- Oct -11 1 1 J -19 BINC -00057 RESERVOIR SATURATION TOOL LOG 13- Aug -11 1 1 15 -17 BVYC -00006 RESERVOIR SATURATION TOOL LOG 29- Sep -11 1 1 M -21A BBSK -00074 RESERVOIR SATURATION TOOL LOG 6-Jun-11 1 1 E -19C BD88 -00132 MEMORY COMPENSATED NEUTRON LOG 6-Jul-11 1 1 2 -04/M -19 AV1P -00100 RESERVOIR SATURATION TOOL LOG _ _ 9- Aug -11 1 1 _ G -21 BG4H -00070 'RESERVOIR SATURATION TOOL LOG 6- Aug -11 1 1 r.." 04 -23A BBSK -00091 IRST SIGMA W/ BORAX 26- Aug -11 1 1 Z.61 USW (14$11 19-Jul -11 1 OWDW-SW AV1P -00091 RESERVOIR SATURATION TOOL LOG 16-Jul-11 1 1 4 r i' mi li : ! is Ki I a , '11 1 0 " ,- y " x' 7 , i" < '-- - T7 : ` T- --- T'' L, 71 ,., 11 1 • Prints already distributed PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 ' TE OF ALASKA ALASKA OIL ANDS CONSERVATION COMMISSION • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate 12 Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development II Exploratory ❑ , 195 -1540 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 • 50- 029 - 22604 -00 -00 8. Property Designation (Lease Number) : _ 9. Well Name and Number: ADLO- 028285 • PBU G -21 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 13359 feet Plugs (measured) 10525,10162 10151(TOC) feet true vertical 9009.19 feet Junk (measured) UNKNOWN, 12250, 13263 feet Effective Depth measured 13272 feet Packer (measured) 9662 9822 10451 feet true vertical 9006.43 feet (true vertical) 8634 8754 9032 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 73' 20" 34 - 107 34 - 107 Surface 3476' 9 -5/8" 40# NT -80 33 - 3509 33 - 3497. 5750 3090 Production 10570' 7" 26# L -80 32 - 10602 32 - 9038 7240 5410 Liner 2918' 4 -1/2" 12.6# L -80 10441 - 13359 9032 - 9009 8430 7500 Liner Liner Perforation depth: Measured depth: SEE ATTACHED - _ True Vertical depth: _ _ ` t(} 1 t i - Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13Cr80 31 - 9758 31 - 8706 4 -1/2" 12.6# L -80 9751 - 9878 8700 - 8796 Packers and SSSV (type, measured and true vertical depth) 4 -1/2" Baker S -3 Perm Packer 9662 8634 4 -1/2" Baker S -3 Perm Packer 9822 8754 4 -1/2" TIW Packer 10451 9032 rE NED 12. Stimulation or cement squeeze summary: Intervals treated (measured): )EC 00 6 2011 Treatment descriptions including volumes used and final pressure: tilt & -a6 Cons. C° . t AtMtern 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 118 4216 1 166 Subsequent to operation: 865 4496 10 200 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory ❑ Development El - Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil .. 0 Gas ❑ WDSPL ❑ GSTOR El WINJ ❑ WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Nam 1 e Lastu a Title Petrotechnical Data Technologist Signat e ` ./.-'1 Phone 564 -4091 Date 12/2/2011 R6DMS DEC 0 7 I t- f *� /z. • 7.1 Form 10 -404 Revised 10/2010 Submit Original Only G -21 195 -154 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base G -21 11/13/95 PER 10,790. 11,075. 9,020.95 9,016.99 G -21 11/13/95 PER 12,700. 13,240. 9,000.66 9,005.87 G -21 2/13/96 APF 12,580. 12,610. 8,998. 8,998.81 G -21 2/13/96 APF 12,610. 12,640. 8,998.81 8,999.63 G -21 2/13/96 APF 12,640. 12,670. 8,999.63 9,000.19 G -21 2/13/96 APF 12,670. 12,700. 9,000.19 9,000.66 G -21 10/16/99 SQZ 10,790. 11,075. 9,020.95 9,016.99 G -21 2/17/02 APF 11,850. 12,150. 8,994.96 8,991.35 G -21 9/30/02 MLK 2,739.9 2,740.5 2,727.82 2,728.41 G -21 9/30/02 MLK 2,543.9 2,544.5 2,532.37 2,532.97 G -21 9/30/02 MLK 2,529.9 2,530.5 2,518.43 2,519.03 G -21 2/21/03 BPS 9,860. 9,890.8 8,782.49 8,805.84 G -21 5/27/03 BPP 9,860. 9,890.8 8,782.49 8,805.84 G -21 9/1/09 APF 10,234. 10,264. 9,015.1 9,023.21 G -21 9/1/09 BPS 10,525. 10,790. 9,036.12 9,020.95 G -21 8/26/11 BPS 10,162. 10,790. 8,986.51 9,020.95 IIII G -21 8/28/11 SPS 10,155.5 10,162. 8,983.36 8,986.51 G -21 9/23/11 APF 10,045. 10,050. 8,919.09 8,922.38 G -21 11/19/11 APF 10,040. 10,045. 8,915.76 8,919.09 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE 411 • • G -21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/19/2011 ;***WELL SHUT IN ON ARRIVAL* ** (ELINE PERF) 'INITIAL T /I /O= 0/1100/0 3 RIH WITH PEK -B /PGGT/ 5' 3 -3/8" 3406 PJ HSD OAL =16', OAW =300# FISHING ;NECK SIZE = 1.38" PERFORATION INTERVAL 10040' -10045 AS PER REFERENCE LOG MWD 10/19/1995, 10045'- 10050' AS PER TIE IN LOG SLB MEM BORAX /CNL 9/8/1998. CCL TO TOP SHOT = 4.2', CCL STOP DEPTH = 10035.8' ;VISUAL CONFORMATION OF SHOTS FIRED FINIAL T /I /O= 0/1100/0 WELL LEFT SHUT IN SWAB, SSV, WING CLOSED AND OTG DSO AND PE ;NOTIFIED OF DEPARTURE ** *JOB COMPLETE * ** FLUIDS PUMPED BBLS 1 DIESEL 1 METH 2 TOTAL TREE _ * 4" CAMERON WELLHEAD= FMC -2 SAFETY NOTES: * *4� CHROME TBCa ** ACTUATOR= BAKER KB. ELEV = 70.05' BF. ELEV = 38.4' KOP = 4529' Max Angle = 96 @ 10683' Datum MD = 9975' 1 1 1 2211' I — I4 - 1/2" HES X NIP, ID = 3.813" I Datum 'ND = 8800' SS GAS LIFT MANDRELS 9 -5/8" CSG, 40 #, NT -80, ID = 8.835" H 3509' ST MD TVD DEV TYPE VLV LATCH PORT DATE C 4 3408 3396 0 KGB2 DOME BK 16 09/19/11 L 3 6121 5917 39 KGB2 SO BK 20 09/19/11 2 8412 7666 42 KGB2 DMY SBK -2 0 08/16/06 1 9572 8566 40 KGB2 DMY SBK -2 0 08/16/06 1 1 9641' --I4 -112" HES X NIP, ID = 3.813" I Minimum ID = 3.725" @ 9685' 4 -1!2" HES XN NIP 2 K — 9662' H7 " X4 -1/2" BKRS -3 PKR, ID= 3.875" 1 1 1 9686' H 4 -1/2" HES X NIP, ID = 3.813" I 4 -1/2" TBG, 12.6 #, 13 -CR80 VAM TOP, --I 9738' 1-- .0152 bpf, ID = 3.958" 1 ,... 1 . 758' I- I 7' X 4 -1/2" UNIQUE OV ERSHOT I TUBING STUB 1-1. 9751' i i I 9812' H 4 -1 /2" HES X NIP, ID = 3.813" I 17" CSG, 26 #, L -80, ID = 6.276" 1-1 9838' 1 ` Z z / ` 9822' I X 4 -1/2" BKR S -3 PKR, ID = 3.875" I I TOP OF 7" CSG H 9838' I i i 9845' H4-1/2" HES X NIP, ID = 3.813" I L 9685' H4 -1/2" HES XN NIP, ID = 3.725" I I4 -1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" H 9878' I 4 ' ' . 9878' I - 14 - 1/2" WLEG, ID = 3.958" I o ,o ,v 10151' I — I EST CEMENT TOP (08 /25/11) 1 _ 10162' H 4 -1/2" POSISET PLUG (08/26/11) 1 I I TOP OF 4 -1/2" LNR I- 10441' 1-3;h f 10451' I X 4 -1/2" TMJ HYDRO PKR, ID = 3.875" ■■ 1 10525' H HES EZDRILL CIBP (09/01/09) I 17" CSG, 26 #, L -80, ID = 6.276" I--I 10602' I-- • ? H FISH -IBP DEBRIS (8/17/06 RWO) 1 PERFORATION SUMMARY REF LOG: SPERRY SUN MWD ON 10/95 NO 12250' J-I CIBP JUNK LEFT 02!17/02 ANGLE AT TOP PERF: 49° @ 10045' Note: Refer to Production DB for historical perf data ` SEE SPF INTERVAL OPN/SQZ DATE 3 -3/8" 6 10045 - 10050 0 09/23/11 13263' « FISH - 4 -1/2" HALIBURTON CIBP 3 -3/8" 6 10234 - 10264 C 09/01/09 MILL LOOSE - PUSH TO BTM 2 -3/4" 4 10790 - 11075 S 10/16/99 2 -1/2" 4 11850 - 12150 C 02/17/02 ,, 3 -3/8" 6 12580 - 13240 C 02/13/96 I PBTD H 13272' lk% - 1 4,��� I4 -1/2" LNR, 12.6 #, L -80, .0152 bpf, ID = 3.958" I — I 13359' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/13/95 ORIGINAL COMPLETION 09/20/11 JCM/ PJC POSISET/ MIT PLUG (8/28/11) WELL: G -21 08/17/06 NORDIC 3 RWO 09/20/11 SET/ PJC GLV C/O (09/19/11) PERMIT No: 1951540 08/30/06 JCM/PJC GLV /O 09/23/11 TTW/ PJC ADPERFS (09/23/11) API No: 50- 029 - 22604 -00 10/22/06 MS / PJC DRLG DRAFT CORRECTION SEC 12, T11 N, R13E, 2911' FSL & 2368' FEL 10/01/09 TAR/SV SET CIBP /ADPERF (09/01/09) 02/02/10 RCT /PJC GLV C/0 (01/23/10) BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSIL E tVED REPORT OF SUNDRY WELL OPERATIO 11 1 2(w 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations 1151 Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver U n+ r i e((��xt4e i Change Approved Program ❑ Operat. Shutdown ❑ Perforate 0 ` "'' - WARM . V,M IC 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. PAingiti/Oumber: Name: Development IO Exploratory ❑ - 195 -1540 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 - 6612 ..50- 029 - 22604 -00 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 028285 - PBU G -21 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 13359 feet Plugs (measured) 10525, 10162, 10151(TOC) feet true vertical 9009.19 feet Junk (measured) UNKNOWN, 12250, 13263 feet Effective Depth measured 13272 feet Packer (measured) 9662 9822 10451 feet true vertical 9006.43 feet (true vertical) 8634 8754 9032 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 73' 20" 34 - 107 34 - 107 Surface 3476' 9 -5/8" 40# NT -80 33 - 3509 33 - 3497 5750 3090 Production 10570' 7" 26# L -80 32 - 10602 32 - 9038 7240 5410 Liner 2918' 4 -1/2" 12.6# L -80 10441 - 13359 9032 - 9009 8430 7500 Liner Liner Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ - _ - - Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13Cr80 31 - 9758 31 - 8706 4 -1/2" 12.6# L -80 9751 - 9878 8700 - 8796 Packers and SSSV (type, measured and true vertical depth) 4 -1/2" Baker S -3 Perm Packer 9662 8634 4 -1/2" Baker S -3 Perm Packer 9822 8754 4- 1 /2 " TIW Packer 10451 9032 12. Stimulation or cement squeeze summary: Intervals treated (measured): 2 if t. Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 571 44,016 27 701 Subsequent to operation: 110 3,905 1 163 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development o Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil t 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Nam • • - Lastu r Title Petrotechnical Data Technologist Signal a I11,' Phone 564 -4091 Date 10/14/2011 c ad RBDMS OCT 19 201t� /6 •� y . // Form 10-404 Revised 10/2010 2:00 Submit Original Only G -21 195 -154 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base G -21 11/13/95 PER 10,790. 11,075. 9,020.95 9,016.99 G -21 11/13/95 PER 12,700. 13,240. 9,000.66 9,005.87 G -21 2/13/96 APF 12,580. 12,610. 8,998. 8,998.81 G -21 2/13/96 APF 12,610. 12,640. 8,998.81 8,999.63 0-21 2/13/96 APF 12,640. 12,670. 8,999.63 9,000.19 G -21 2/13/96 APF 12,670. 12,700. 9,000.19 9,000.66 G -21 10/16/99 SQZ 10,790. 11,075. 9,020.95 9,016.99 0-21 2/17/02 APF 11,850. 12,150. 8,994.96 8,991.35 G -21 9/30/02 MLK 2,739.9 2,740.5 2,727.82 2,728.41 G -21 9/30/02 MLK 2,529.9 2,530.5 2,518.43 2,519.03 G -21 9/30/02 MLK 2,543.9 2,544.5 2,532.37 2,532.97 0-21 2/21/03 BPS 9,860. 9,890.8 8,782.49 8,805.84 • G -21 5/27/03 BPP 9,860. 9,890.8 8,782.49 8,805.84 G -21 9/1/09 APF 10,234. 10,264. 9,015.1 9,023.21 0-21 9/1/09 BPS 10,525. 10,790. 9,036.12 9,020.95 G -21 8/26/11 BPS 10,162. 10,790. 8,986.51 9,020.95 0-21 8/28/11 SPS 10,155.5 10,162. 8,983.36 8,986.51 G -21 9/23/11 APF 10,045. 10,050. 8,919.09 8,922.38 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER 1 BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN • OH OPEN HOLE • • G -21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 8/26/2011 ** *JOB CONTINUED FROM 25- AUG- 2011 * ** (E -LINE Set Posiset / Dump Cement) ;SET SLB POSISET PLUG, TOP PLUG SET cr 10162' ;MADE ONE SUCCESSFUL DUMP BAILER RUN OF 4 GAL OF CEMENT ON TOP :OF PLUG MADE A SECOND BAILER RUN OF CEMENT W/ NO SUCCESS. WEIGHT BAR IN BAILER ACTIVATED BUT SHEAR DISK ON BOTTOM OF BAILER DID NOT FULLY OFF SEAT, POSSIBLY DUE TO DEVIATION OF WELL (60 DEG DEV.) LAYED DOWN EQUIPMENT AND WILL RETURN IN AM TO CONTINUE DUMPING CEMENT WELL LEFT SHUT IN - NOTIFIED PAD OP OF WELL STATUS ** *JOB CONTINUED ON 27- AUG - 2011 * ** 8/27/2011 ** *JOB CONTINUED FROM 27- AUG - 2011 * ** (E -LINE Cement dump) INITIAL T /I /0= 105/0/0 SWAB/WING= CLOSED, MASTER -OPEN, IA/OA =OTG MADE 3RD BAILER RUN OF CEMENT W/ NO SUCCESS (CEMENT DIDN'T DUMP 'AGAIN, SHORTENED DUMP BAILER FROM 4 SECTIONS TO 3 SECTIONS FOR OTHER BAILER RUNS) MADE TWO MORE SUCCESSFUL DUMP BAILER RUNS OF CEMENT (DUMPED 4 GAL OF CEMENT ON TOP OF PLUG ESTIMATED TOP OF CEMENT AT ;10155.5') ** *LAYED DOWN EQUIPMENT FOR THE NIGHT - WILL RETURN TO CONTINUE DUMPING CEMENT IN A.M. * ** FINAL T /I /0= 95/0/0 ** *JOB CONTINUED ON 28- AUG - 2011 * ** 8/28/2011 ** *JOB CONTINUED FROM 27- AUG - 2011 * ** (E -Line Cement dump) INITIAL T /I /0= 90/0/0 DUMP 6 COAL OF CEMENT ON TOP OF PREVIOUS 10 GALS -- FINAL 'ESTIMATED TOP OF CEMENT @ 10151.5' TOTAL CEMENT DUMP ON PLUG 16 GAL EQUIVALENT OF 10' NOTIFIED PAD OP OF WELL STATUS -- WELL LEFT SHUT IN ON DEPARTURE ; ** *JOB COMPLETE * ** 9/161'201'1 - , : f/1/0-; 50/0/0 Temp = S /I, Assist SLB MIT- TBG to 2000 PSI. PASSED (Pre -e- line) Pumped 1 bbls neat MEOH & 18.3 bbls 40* diesel to reach test PSI. 1st 15 min TBG lost 58 PSI & 2nd 15 min TBG lost 19 PSI for a total Toss of 77 PSI in 30 min. Bled back —2 bbls FWHP's= 500 /0/0 9/16/2011i*** WELL S/I ON ARRIVAL * ** (PERF) ;LOCATED TUBING TAIL @ 9,831' SLM ( +3' CORR. TO 9,834' ELMD) DRIFT 3 -3/8" DUMMY GUN, S- BAILER TO 10,137' SLM (10,140' ELMD) RECOVERED CEMENT, 85' OF RATHOLE BELOW PLANNED PERFS . * * *WSR CONTINUED ON 9/17/11, PAD -OP NOTIFIED * ** • • 9/23/2011 ***JOB CONTINUED FROM 22- SEPT -11 * ** (ELINE PERF) PERF INTERVAL (TIE IN LOG: MEMORY BORAX CNL 9/8/98) 10050'- 10055', CCL TO TS 4.17', CCL STOP DEPTH 10045.83'. PERF GUNS: 3 -3/8" 3406 HMX PJ, 60 ;DEG PHASING, 6 SPF. GOOD INDICATION IF FIRE POOH AND RETURN TO ;SURFACE. !VISUAL INDICATION AT SURFACE OF GUN FIRED WELL LEFT SHUT IN SWAB, SSV, WING CLOSED AND OTG DSO NOTIFIED OF 1 DEPARTURE FINAL T /I /0= 270/75/0 ** *JOB COMPLETE * ** FLUIDS PUMPED BBLS 24 DIESEL 1 NEAT METH 25 TOTAL FLUIDS PUMPED GALS 16 CEMENT 16 TOTAL TREE _ - 4" CAMERON • SAFETY 41106 * *4 -1 /2" CHROME TBG* ** WELLHEAD = FMC -2 ACTUATOR= BAKER KB. ELEV = 70.05' BE ELEV = 38.4' KOP = 4529' Max Angle = 96 @ 10683' Datum MD = 9975' 1 1 1 2211' I- 14 -1/2" HES X NIP, ID = 3.813" I Datum TV D = 8800' SS GAS LIFT MANDRELS 19 -5/8" CSG, 40 #, NT -80, ID = 8.835" H 3509' (-- ST MD TV D DEV TYPE VLV LATCH PORT DATE 4 3408 3396 0 KGB2 DOME BK 16 09/19/11 L 3 6121 5917 39 KGB2 SO BK 20 09/19/11 2 8412 7666 42 KGB2 DMY SBK -2 0 08/16/06 1 9572 8566 40 KGB2 DMY SBK -2 0 08/16/06 1 1 1" HES X NIP, ID = 3.813" I Minimum ID = 3.725" @ 9685' 4-1/2" HES XN NIP Z Z`-----I 9662' I-17" X 4-1/2" BKR S -3 PKR, ID = 3.875" 1 1 1 9686' -I 4 -1/2" HES X NIP, ID = 3.813" I 4 -1/2" TBG, 12.6 #, 13 -CR80 VAM TOP, — 9738' 1----7 .0152 bpf, ID = 3.958" , 975$ I--1 X 4 -1/2" UNIQUE OVERSHOT 1 1 4 -1/2" HES X NIP ID = 3.81 '" (TUBING STUB H 9751' � � � � 9812' I — I 3 I 1 7" CSG, 26 #, L -80, ID = 6.276" I - 1 9838' 1 `2:I ' 1 9822' 1 " X 4 -1/2" BKR S -3 PKR, ID = 3.875" I TOP OF 7" CSG 1 — I 9838' I i 1 9845' H4-1/2" HES X NIP, ID = 3.813" I 1 1 1 9685' H4-1/2" HES XN NIP, ID = 3.725" I 14-1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" 1 - 1 9878' 1 _878' 4 -1/2" , p _ ��■ ■� 1 I 10151' 878' _ 4 EST CEMENT TOP (08 /25/11) I 10162' H4 -1/2" POSISET PLUG (08/26/11) 1 ..__------L (TOP OF 4 -1/2" LNR 1-1 10441' 1 - 4 10451' I--17" X 4 -1/2" TIW HYDRO PKR, ID = 3.875" I 1 10525' I — ) HES EZDRILL CIBP (09/01/09) 1 17" CSG, 26 #, L -80, ID = 6.276" H 10602' I--1 6 ? H FISH-IBP DEBRIS (8/17/06 RWO) I PERFORATION SUMMARY REF LOG: SPERRY SUN MWD ON 10/95 \ 12250' H CIBP JUNK LEFT 02 /17/02 1 ANGLE AT TOP PERF: 49° @ 10045' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPN/SQZ DATE 3 -3/8" 6 10045 - 10050 0 09/23/11 V ` 13263' FISH - 4 -1/2" HALIBURTON CIBP 3 -3/8" 6 10234 - 10264 C 09/01/09 MILL LOOSE - PUSH TO BTM 2 -3/4" 4 10790 - 11075 S 10/16/99 2 -1/2" 4 11850 - 12150 C 02/17/02 3 -3/8" 6 12580 - 13240 C 02/13/96 At I PBTD I 13272' �i * `,,`■ 14 -1/2" LNR, 12.6 #, L -80, .0152 bpf, ID = 3.958" I--{ 13359' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/13/95 ORIGINAL COMPLETION 09/20/11 JCM/ PJC POSISET/ CMT PLUG (8/28/11) WELL: G -21 08/17/06 NORDIC 3 RWO 09/20/11 SET/ PJC GLV C/0 (09/19/11) PERMIT No: 1951540 08/30/06 JCM/PJC GLV C/0 09/23/11 TTW/ PJC ADPERFS (09/23/11) API No: 50- 029 - 22604 -00 10/22/06 MS / PJC DRLG DRAFT CORRECTION SEC 12, T11 N, R13E, 2911' FSL & 2368' FEL 10/01/09 TAR/SV SET CIBP /ADPERF (09/01/09) 02/02/10 RCT /PJC GLV C/0 (01/23/10) BP Exploration (Alaska) OPERABLE: G-21 (PTD.#19515 MITIA Passed . Page 1 of 2 Regg, James B (DOA) From: NSU, ADW WeII Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] ~'~~h1 1I~~~, o Sent: Sunday, January 24, 2010 10:12 AM To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); GPB, Area Mgr Central (GC1/3/FS3); GPB, GC1 OTL; GPB, GC1 Wellpad Lead; GPB, Well Pad EKG; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Optimization Engr; GPB, Wells Opt Eng Cc: Stechauner, Bernhard; Quy, Tiffany; NSU, ADW Well Integrity Engineer Subject: OPERABLE: G-21 (PTD #1951540) MITIA Passed All, Well G-21 (PTD #1951540) passed an MITIA on 1/23/10 after setting dummy gas lift valves. The well has been reclassified as Operable. Please use cau Ion In re urning the well to production as the R is liquid packed and IA pressure will increase due to thermal expansion. Thank you, Anna ~Du6e, ~.~. (alt Torin Roschinger) Well integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 From: NSU, ADW Well Integrity Engineer Sent: Saturday, January 09, 2010 4:49 AM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy (DOA)'; GPB, Area Mgr Central (GCl/3/FS3); GPB, GCl OTL; GPB, GCi Wellpad Lead; GPB, Well Pad EKG; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Optimization Engr; GPB, Wells Opt Eng Ce: Stechauner, Bernhard; Quy, Tiffany Subject: UNDER EVALUATION; G-21 (PTD #1951540) Sustained Casing Pressure on the IA All, Well G-21 (PTD #1951540) has been found to have sustained casing pressure on the IA. The TIO pressures were 2400/2340/10 psi on 01/08/10. DHD performed a TIFL that failed, confirming TxIA communication. The well has been classified as Under Evaluation and placed on a 28-day clock. The plan forward for the well is as follows: 1. D: TIFL -FAILED 2. S: Set DGLVs 3. F: MIT-IA to 3000 psi A wellbore schematic and TIO plot have been included for reference. « File: G-21.pdf» « File: G-21 TIO Plot 01-09-10.doc» 1/25/2010 QPERABLE: G-21 (PTD #19515 MITIA Passed • Page 2 of 2 Please call with any questions. Thank you, Torin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 1/25/2010 UNDER EVALUATION: G-21 (P~ #1951540) Sustained Casing Pressur~on the IA Page 1 of 1 Regg, James B {DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] ~ ~ ~ Sent: Saturday, January 09, 2010 4:49 AM ~~ ~ ~ ~~~ To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); GPB, Area Mgr Central (GC1/3/FS3); GPB, GC1 OTL; GPB, GC1 Wellpad Lead; GPB, Well Pad EKG; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Optimization Engr; GPB, Wells Opt Eng Cc: Stechauner, Bernhard; Quy, Tiffany Subject: UNDER EVALUATION: G-21 (PTD #1951540) Sustained Casing Pressure on the IA Attachments: G-21.pdf; G-21 TIO Plot 01-09-10.doc All, Well G-21 (PTD #1951540) has been found to have sustained casing pressure on the IA. The TIO pressures were 2400/2340/10 psi on 01/08/10. DHD performed a TIFL that failed, confirming TxIA communication. The well has been classified as Under Evaluation and placed on a 28-day clock. The plan forward for the well is as follows: 1. D: TIFL -FAILED 2. S: Set DGLVs ' 3. F: MIT-IA to 3000 psi A wellbore schematic and TIO plot have been included for reference. «G-21.pdf» «G-21 TIO Plot 01-09-10.doc» Please call with any questions. Thank you, Torin Roschinger (alt. Anna Dube) Well Integrity .Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 ~~$~~ J/~N ~ ~ 24th ~~ ~S ~~ ~' >_'~ ~ ~, ~ F SCP ~ Z~x;Ps; 1/11/2010 PBU G-21 (PTD# 1951540) TIO Plot 1-9-2010 ..,.,~ -~- T bg f IA -~ OA OOA OOOA On • 9110 TREE= 4" CAMERON WELLHEAD = FMC ACTUATOR = BAKER KB. ELEV = 70.05' BF. ELEV = 38.4' KOP = 4529' Max Angle = 96 @ 10683' Datum MD = 9975' DatumTVD= 8800'SS ~ G-21 9-5/8" CSG, 40#, NT-80, ID = 8.835" ~-i 3509' Minimum ID = 3.725" @ 9685' 4-1/2" HES XN NIP 4-1/2" TBG, 12.6#, 13-CR80 VAM TOP, 973$' .0152 bpf, ID = 3.958" TUBING STUB 9751' 7" CSG, 26#, L-80, ID = 6.276 9838' TOP OF 7" CSG 9838' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 9878' TOP OF 4-1 /2" LNR 7" CSG, 26#, L-80, ID = 6.276" PERFORATION SUMMARY REF LOG: SPERRY SUN MWD ON 10/95 ANGLE AT TOP PERF: 72° @ 10850' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPNISOZ DATE 3-318" 6 10234 - 10264 O 09!01109 2-314" 4 10790 - 11075 S 10!16/99 2-1/2" 4 11850 - 12150 C 02/17/02 3-318" 6 12580 - 13240 C 02/13/96 PBTD 13272' 4-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 13359' DATE REV BY COMMEMS DATE REV BY COMMENTS 11/13/95 ORIGINAL COMPLETION 08/17/06 NORDIC RWO 08/30/06 JCIWPJC GLV C/O 10/22/06 MS / PJC DRLG DRAFT CORRECTION 10/01!09 TAR/SV SET CIBP/ADPERF (09(01/09) FISH-IBP DEBRIS (8!17!06 RWO) CIBP JUNK LEFT 02117(02 FISH - 4-1/2" HALIBURTON CIBP MILL LOOSE- PUSH TO BTM PRUDHOE BAY UNf>- WELL: G-21 PERMff No: 1951540 API No: 50-029-22604-00 SEC 12, T11 N, R13E, 2911' FSL & 2368' FEL BP Exploration {Alaska) S ES: `*4-1 /2" CHROME TBG'** 4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DlVV TYPE VLV LATCH PORT DATE 4 3408 3396 0 KG62 DOME BK 16 08/30/06 3 6121 5917 39 KG62 SO BK 20 08/30/06 2 8412 7666 42 KG62 DMY SBK-2 0 08/16/06 1 9572 8566 40 KGB2 DMY SBK-2 0 08/16(06 9641' --~4-1 /2" HES X NIP, ID = 3.813" 9662' 7" X 4-112" BKR S-3 PKR, ID = 3.875" 9686" ~4-1/2" HES X NIP, ID = 3.813"~ 9758' 7' X 4-112" UNIQUE OVERSHOT 9812' 9822' 9845' 9685' 987$' 9834' 4-112" HES X NIP, !D = 3.813" 7" X 4-112" BKR S-3 PKR, ID = 3.875" -r-1f2" HES X NIP, ID = 3.813" 4-112" HES XN NIP, ID = 3.725 4-112" TTL WLEG~ -~ELMD TT LOGGED 11/21!95 10451' -~7" X 4-1/2" TIW HYDRO PKR, ID = 3.875" 10525' HES EZDRILL CIBP (09/01109) 1. Operations Performed: o Abandon A STATE OF ALASKA fie., J/ii106 AlA~ Oil AND GAS CONSERVATION COM_SION REPORT OF SUNDRY WELL OPERATIONS .i\laska Oil & Gas Cons. Commission Anchorage o Re-Enter Suspended Well o Other RECEIVED SEP 1 9 2006 o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): o Repair Well ~ Pull Tubing o Operation Shutdown o Plug Perforations 0 Stimulate o Perforate New Pool 0 Waiver o Perforate o Time Extension 99519-6612 4. Well Class Before Work: ~ Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number: 195-154 6. API Number: 50-029-22604-00-00 70' 9. Well Name and Number: PBU G-21 ADL 028285 11. Present well condition summary Total depth: measured 13359 feet true vertical 9009 feet Effective depth: measured 13272 feet true vertical 9006 feet 10. Field 1 Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool 8. Property Designation: Plugs (measured) 8513 Junk (measured) 9878 Casing Structural Conductor Surface Intermediate Production Liner Length Size MD TVD Burst Collapse 7" 107' 3509' 1 0602' 107' 3497' 9038' 1490 5750 7240 470 3090 5410 107' 3476' 1 0569' 20" 9-5/8" 2918' 4-1/2" 10441' - 13359' 9032' - 9009' 8430 7500 ,,,~~A\il.U:::L QCP 9 ¡; ~~:\in!~~~.' -tJ L:' t-:? '\-1 Perforation Depth MD (ft): Perforation Depth TVD (ft): 11850' - 13240' 8995' - 9006' Tubing Size (size, grade, and measured depth): 4-112", 12.6# 13Cr80 1 L-80 9878' 7" x 4-1/2" Baker 'S-3' Packer; 7" x 4-1/2" Baker 'S-3' Packers and SSSV (type and measured depth): packer 9662' & 9822' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Oíl-Bbl Prior to well operation: NIA Subsequent to operation: 1,007 16,401 71 14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after proposed work: o Exploratory ~ Development 0 Service ~ Daily Report of Well Operations 16. Well Status after proposed work: ~ Well Schematic Diagram ~ Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Doug Cismoski, 564-4303 306-269/306-274 Re resentative Dail Avera e Production or In'ection Data Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure 13. 500 360 Printed Name Terrie Hubble Signature ~ Form 10-404 Revised 04/2006 Title Technical Assistant P Date O~µ'ð/OÇ:, Prepared By Name/Number: RBDMS BFl SEP 2 Terrie Hubble, 564-4628 Submit Original Only Di~ital Wellfile . Well Events for SurfaceWell - G-21 Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> GC1 -> G -> G-21 Date Range: 28/May/2006 to 12/Ju1/2006 Data Source(s): DIMS, AWGRS . Page 1 of 1 Events Source Well Date AWGRS G-21 07/12/2006 AW~RS G-21 07/09/2006 AWGRS G-21 07/03/2006 AWGRS G-21 07/01/2006 AWGRS G-21 06/30/2006 Description T/I/O=VAC/VAC/O, Temp=S1. Monitor WHP's (pre-rig). Well house, scafold, S-riser, and lateral line have been removed Set 4" ciw bpv for pre rig.No problems T/I/O=0/0/400 Pump 106 bbls 9.8 brine down OA FWHP=0/0/400 T/I/O=SSV/VAC/240. Temp=S1. WHP's. (Pre-Rig, ETA 07-03-06). OAP increased 40 psi overnight. T/I/O=Vac/Vac/320. Temp=S1. Bleed WHP's to 0 psi. (Pre Rig, ETA 07/03/06). OA FL @ Surface. Bled OAP from 320 psi to 80 psi in 5 hours. 22 bbl fluids were returned during bleed. Monitored for 30 minutes while rigging down. OAP increased 120 psi to 200 psi during monitor. No change in TP or lAP during bleed. Final WHP's=Vac/Vac/200. Aw~RS G-21 06/25/2006 ***Cont. from 06-24-06 WSR *** Load IA / Load TBG (rig prep.) - Cont. loading IA with 190 bbls (total) 2% KCL water, Cap with 40 bbls diesel FP, Load tubing w/ 5 bbls meth, & 208 bbls 2% KCI water, Cap w/ 35 bbls diesel FP, Monitor WHPs fell to zero with out bleeding. Final WHP 0/0/320 AWGRS G-21 06/24/2006 T/IA/OA=10/250/300 Inj. test on lA, Load IA (Rig prep) - Pump 49 bbls diesel down IA to establish inj. rate of 1.25 bpm @ 2750 psi, Swap over to begin pumping 2% KCI water down IA to load for upcoming rig work ***Continued on 06-25-06 WSR*** AWGRS G-21 06/20/2006 T/I/O = 150/250/230. S1. TBG & IA FL for FB. TBG FL @ 372' (5.7 bbls), IA FL @ 654' (11.4 bbls). AWGRS G-21 06/16/2006 T/I/O=0/250/300 MIT OA to 2000 psi (FAILED) (pre-RWO) Pumped 20 bbls diesel down OA. Established LLR of 1 bpm at 1100 psi. Pressure fell off imediately after shutting down. Final WHP's=0/250/0 AWGRS G-21 05/30/2006 ***WELL S/I ON ARRIVAL *** ( PRE RWO ) RAN GAMMA RAY / CCL LOG FROM 3322' SLM TO 3000' SLM @ 40 FPM***GOOD DATA**** LOG INDICATES THAT PACKER @ 3099' MD TO WLEG AT 3112' MD IS MISSING ***WELL S/I ON DEPARTURE*** ( NOTIFIED PAD OPERATOR) AWGRS G-21 OS/29/2006 T/I/O=SI/250/300 PPPOT-T (passed) Rigged up high pressure bleeder tool to test fitting 0 psi on void. Tested @ 5000psi W/ no pressure loss after 30 min. All LDS functioned & torqued @ 450 ft Ibs. PPPOT-IC (passed) Rigged up high pressure bleeder tool to test fitting 0 psi on void. Tested @ 3000 psi W/ no pressure loss after 30 min. All LDS functioned & torqued @ 450 ft Ibs. AwGRS G-21 OS/28/2006 T/I/O=0/200/300 Assist Slickline. CMIT TxIA @ psi. MIT OA @ 2000 psi. (Shut In)(Pre-RWO) Loaded TBG w/ 60 bbls Diesel. SSL unable to set TBG plug Final WHP's=0/240/300 AW~ßS G-21 OS/28/2006 ***WELL S/I ON ARRIVAL ***(pre-rwo) DRIFTED THRU XN NIPPLE W/ XXN PLUG, LOST 2 7/8" XXN @ 3038' SLM, FELL OUT TBG TAIL. PULLED PLUG FROM 3312' SLM. RUN TEL, LOCATE TUBING TAIL @ 3035' SLM. ***WELL LEFT S/I*** http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default.aspx 9/18/2006 . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: Rig move underway from Kuparuk field with rig currently at approx. .5 miles west of MPU intersection of Spine Road at 2215-hrs. Moving rig from Kuparuk to GPB G-21. Moving rig from Kuparuk to GPB G-21. Moving rig from Kuparuk to GPB G-21. Rig on location at 0300-hrs. Build BOPE stack and set on stump in rig cellar. Waiting on crane to arrive to remove well house from well G-12. Clearance problem with spotting rig over well G-21. Veco Well Support remove G-12 well house. Spot rig over well. Waiting on Drillsite Maintenance to arrive and pull BPV. Also waiting on Veco well support to arrive with Tiger Tank and hardline. Accepted rig at 2200-hrs. Waiting on Drillsite Maintenance to arrive and pull BPV. Also waiting on Veco well support to arrive with Tiger Tank and hardline. Pull BPV w/lubricator and rigging up Tiger Tank with hardline. PIT hardline to 3500 psi. Troubleshooting leaks in circulating lines. PIT circulating lines to 3500 psi. Circulate @ 3.0-BPM down tubing at 400-910 psi. Pumped 8-Bbls down tubing to catch fluid. Continued pumping @ 3.0-BPM at 400-910 psi. Pumped 173-Bbls and acquired 29-Bbls returns to Tiger Tank. Outer Annulus pres = O-psi. DECOMP Realign valves and Reverse Circulate, starting pump rate at 2-BPM and see pressure climb quickly to 2,000-psi after 2-Bbls pumped. Reduce rate to 1-BPM (21-SPM) and pressure drops to 1800-psi after 20-Bbls. Pressure after 35-Bbls @ 1-BPM increased to 2,000-psi. Back-off rate to 19-5PM and hold @ 1 ,800-psi for 2-Bbls, then increase rate to 22-SPM and pressure climbs to 2,300-psi, then decreases to 3,000-psi at 64-Bbls pumped when returns come to surface. Pump total of 80-Bbls and see 35-Bbls of returns to Tiger Tank. There was no sign of pressure on the OA during the Well Kill pumping operations. 253-Bbls of 1200 F seawater pumped, 64-Bbls of returns to Tiger Tank (70-% diesel, 30-% seawater), 189-Bbls lost to the formation. Check IA and tubing immediately after S/I pump and both are on vacuum. Call FMC to install TWC. Both sides still on vacuum. P/U and install TWC with 5 to 5-1/2 turns in for +/- 1-1/2" insertion. Break-off Circulating Lines, N/D Tree and Adaptor flange. N/U BOPE to prepare for BOPE testing. Chuck Scheve indicated that he would witness tests for AOGCC. PT BOPE 250-psi low, 3500-psi high. Unable to get both lower and upper 2-7/8" x 5-1/2" VBR pipe rams to test. Raised Koomey pressure to 3000 psi and still no successful test on lower VBR pipe rams. Decision made to install 2-718" fixed bore pipe rams in upper BOP and 3-1/2" fixed bore pipe rams in lower BOP. Test witnessed by AOGCC Rep. - Chuck Sheve. 7/26/2006 22:15 - 00:00 1.75 MOB P PRE 7/27/2006 00:00 - 00:00 24.00 MOB P PRE 7/28/2006 00:00 - 00:00 24.00 MOB P PRE 7/29/2006 00:00 - 03:00 3.00 MOB P PRE 03:00 - 12:00 9.00 MOB P PRE 12:00 - 19:00 7.00 RIGU P PRE 19:00 - 20:00 1.00 RIGU P PRE 20:00 - 21 :00 1.00 RIGU P PRE 21 :00 - 00:00 3.00 KILL N DECOMP 7/30/2006 00:00 - 01 :00 1.00 KILL N DECOMP 01 :00 - 03:30 2.50 KILL P DECOMP 03:30 - 05:00 1.50 KILL P DECOMP 05:00 - 06:00 1.00 KILL P DECOMP 06:00 - 08:00 2.00 KILL P 08:00 - 09:00 1.00 KILL P DECOMP 09:00 - 09:30 0.50 KILL P DECOMP 09:30 - 11 :30 2.00 WHSUR P DECOMP 11 :30 - 16:00 4.50 BOPSU P DECOMP 16:00 - 22:30 6.50 BOPSU P DECOMP Printed: 8/21/2006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: Changing out upper and lower pipe rams to fixed bore rams - Upper = 2-7/8", Lower = 3-1/2". Upon removing upper pipe rams, found them to have been installed upside down. Lower pipe rams when pulled were found to have been installed correctly. 7/31/2006 00:00 - 02:30 DECOMP Changing out upper and lower pipe rams. Installed fixed bore 2-7/8" rams in upper BOP. installed 3-1/2" fixed bore rams in lower BOP. 02:30 - 04:00 DECOMP PIT upper and lower pipe rams to 250 psi Lo/3500 psi High. Successful test. LD test jts. Clear and clean rig floor. Prepare to pull TWC. 04:00 - 06:00 2.00 DECOMP PU 7" lubricator extension and lubricator. Pull TWC. LD lubricator and 7" lubricator extension. 06:00 - 07:30 1.50 FISH P DECOMP RIU 2-7/8" PAC DP handling equipment, service elevators and air slips, check skate operation. Prepare to M/U 4" GS Spear BHA. 07:30 - 08:00 0.50 FISH P DECOMP Hold PJSM for M/U and RIH with 4" GS Spear BHA. 08:00 - 10:00 2.00 FISH P DECOMP P/U and M/U 4" GS Spear BHA to fish the top Baker KB Packer and 3-1/2" STL Tubing Patch string. M/H BHA to 6-jts of 3-1/8" Drill Collars and RIH. 10:00 - 13:30 3.50 FISH P DECOMP RIH GS Spear BHA on 2-7/8" PAC Drill Pipe from Pipe Shed. S/O weight 50K, P/U weight 50K, neutral weight 49K. 13:30 - 14:30 1.00 FISH P DECOMP Find packer @ 1552' (5' in on DP joint #44), set down to bleed off jars and engage spear into packer. P/U and see packer shear pins shear at - 30K overpull. P/U l' and let seal elements relax for 30-minutes. Set down 2-3' and do not stack out, so packer appears to be free. P/U and see 11 Kover RIH string weight. Tubing Patch is on PAC String. 14:30 - 17:00 2.50 FISH P DECOMP POOH with fish, SIB 14-stands DP and 2-stands DCs in Derrick, UD two single joints of DP. 17:00 - 18:00 1.00 FISH P DECOMP Break off and UD packer. P/U and install 3-1/2" IF box x 3-1/2" STL pin and install Floor Valve to safe-out well. Day relief crew was on SS Flight #351 that was diverted to Fairbanks after aborting two attempts to land at Kuparuk. The night crew that started at midnight last night was sent to bed at 1800-hours. The Tour Pusher is on the Drill Floor. The relief crew will be on Tour later this evening 18:00 - 19:30 1.50 FISH P DECOMP Wait on relief crew. Fluid losses = 20 BPH. 19:30 - 20:30 1.00 FISH P DECOMP Relief crew arrived. Crew orientation and pre-tour HSE meeting. 20:30 - 22:00 1.50 FISH N DECOMP Make repairs on trip tank air controlled valves. 22:00 - 00:00 2.00 FISH P DECOMP POH LD 51 jts. 3-1/2" STL tubing 1x1 through pipe shed. Pumping across top of flow nipple. Fluid losses = 36 BPH. Slight amount of gas venting from tubing. Attempted to fill tubing with water hose. Pumped 4 Bbls. down tubing without filling tubing. Decision to circulate well and bring gas out of tubing to surface. Close bag, pump down tubing @ 3.0 BPM @ 270 psi taking returns through full open choke and gas buster to pits. Hole fill = 30 bbls. indicating fluid level @ -2700' from surface. 8/1/2006 00:00 - 01 :00 1.00 FISH P DECOMP POH UD 5 jts. 3-1/2" STL tubing. Fill tubing with 4 Bbls. seawater @ 2 BPM @ 40 psi pump pressure. Continuous hole fill across top of flow nipple. Losing -20 BPH to hole. Taking Printed: 8/2112006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/1/2006 00:00 - 01 :00 1.00 FISH P DECOMP on 330 Bbls. 120 F seawater into pits. 01 :00 - 02:00 1.00 FISH P DECOMP POH UD 10 jts. through pipe shed 1 x1. Fill tubing w/12 Bbls. seawater which puts fluid level at 1379 FFS. 02:00 - 03:00 1.00 FISH P DECOMP POH UD 10 jts. 3-1/2" STL through pipe shed 1x1. Total joints POH = 35. Fill tubing with 8 bbls. seawater. 03:00 - 04:30 1.50 FISH P DECOMP POH LD remaining 16 jts. Tubing. Retrieved all 51 jts. of straddle tubing along with lower seal assembly. Fluid losses -20 BPH. No evidence of lower half of IBP in tubing or seal assembly. 04:30 - 06:00 1.50 FISH P DECOMP Clear and clean rig floor. Remove pulled Tubing from pipe shed and prepare floor and handling tools to PUMU BHA #2 and additional 2-7/8" PAC DP. Conducted pre-tour HSE meeting. Losses are 70-Bbls/hour. The OA is now on a vacuum. 06:00 - 07:00 1.00 FISH P DECOMP PJSM for M/U BHA. M/U BHA #2, same as BHA #1, to catch bottom Tubing Patch Baker 'KB' packer. 07:00 - 11 :00 4.00 FISH P DECOMP RIH BHA #2 on 2-7/8" PAC DP from Derrick (14-stands) and singles (58-59 jts) from Pipe Shed. 11 :00 - 12:00 1.00 FISH P DECOMP P/U joint #100 and slowly RIH to 3,327' and tag fish. Set down 15K, then P/U past neatral to 5K overpull and pull free, but see bobbles on weight indicator. Stop POH and RIH slowly for full joint #100, P/U #101 and RIH for full joint and see no stack-out. Depth is 3,379'. Decide to POH. 12:00 - 15:00 3.00 FISH P DECOMP POH and SIB 2-7/8" PAC DP (34-stands) and 2-stands DCs in Derrick. Encountered a tight spot at 435' (Nordic 3 RKB), but it must have been a joint "lip", because there was no drag. 15:00 - 17:00 2.00 FISH P DECOMP Break out and UD spear from bottom tubing patch packer. Recovered all of the tubing patch assembly, but did not recover the IBP remains. Discuss options with engineers and decide to RIH with Slick-line to look for IBP remains. 17:00 - 17:30 0.50 FISH P DECOMP RID tubing handling equipment, call for Slickline. 17:30 - 20:30 3.00 FISH P DECOMP Remove Flow Line and Flow Nipple and RlU 13-5/8" Shooting Flange. Gave well a 20-Bbl drink to fill tubing. 20:30 - 21 :00 0.50 FISH P DECOMP PJSM with rig crew, SWS Slick-line crew, and Co-man to discuss P/U and M/U riser, BOP Stack, and Lubricator. 21 :00 - 23:00 2.00 FISH P DECOMP P/U and M/U riser to shooting flange. P/U and M/U slick-line BOP to riser. P/U lubricator and prepare to P/U 3.70" gauge ring and jars. 23:00 - 00:00 1.00 FISH P DECOMP Tagged @ 4,232' MD. POH w/ gauge ring and junk basket. Recovered 10 - 5" steel bands. RBIH w/ gauge ring and junk basket. Fill hole with 20 Bbls/ hr. 8/212006 00:00 - 04:30 4.50 FISH P DECOMP RIH w/3.70" gauge ring and junk basket. Tagged @ 4,242' slm. POH and found 6 steel bands in junk basket. RIH w/3.70" centralizer and 3.50" LIB. LIB showed signs of many more steel bands. No sign of 1.03" neck of IBP. RIH w/ Wire Grabber. Tagged @ 4,242' slm. POH w/17-pieces of SS banding material, 5-pieces of packing rubber. Fill hole w/ 20 Bbls/hr. Consult w/ town. Call Schlumberger E-Line. 04:30 - 05:30 1.00 FISH P DECOMP PJSM. RID Slickline and wait for E-Line to prepare Tubing Punch, String Shot, and Chemical Cutter. 05:30 - 09:00 3.50 FISH P DECOMP Wait on Schlumberger E-Line crew and equipment. 09:00 - 14:30 5.50 FISH P DECOMP PJSM. RlU Schlumberger E-Line equipment and spot E-line unit. Printed: 8/21/2006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/2/2006 14:30 - 15:30 1.00 FISH P DECOMP P/U Tubing Punch assembly, pull inside Lubricator, lower into BOP stack and M/U to BOP stack. 15:30 - 17:00 1.50 FISH P DECOMP RIH with Tubing Punch and stop near 4095' and correlate depths to tubing tally. Place gage on IA and find 150-psi. No pressure on tubing, and OA on very slight vacuum. Fire Tubing Punch at 4095'. See no increase in pressure on IA or on tubing. 17:00 - 18:00 1.00 FISH P DECOMP PJSM. POH withTubing Punch. PJSM to N/D Lubricator and remove Tubing Punch. N/D lubricator and find that all tubing punch shots were fired. 18:00 - 19:30 1.50 FISH P DECOMP Circulated 135 Bbls the long way taking returns to the Tiger Tank. Lost 69 Bbls to the formation and got 66 Bbls of returns. Took 17 Bbls to fill hole. Shut down and monitor. T/I/O = 0/0/0 psi. 19:30 - 00:00 4.50 FISH P DECOMP RlU String Shot, RIH and fire @ 4090' MD - 4102' MD. POH w/ String Shot. Visually confirm detonation. Good shot. RlU Chemical Cutter, RIH and fire @ 4100' MD. Visually confirm detonation. Good Shot. 8/3/2006 00:00 - 03:00 3.00 FISH P DECOMP RD E-Line and prepare to C/O Pipe Rams. 03:00 - 04:00 1.00 FISH P DECOMP Circulated 135 Bbls the long way taking returns to the Tiger Tank. Lost 80 Bbls to the formation and got 55 Bbls of returns. Took 10 Bbls to fill hole. Shut down and monitor. T/I/O = 0/0/0 psi. 04:00 - 04:30 0.50 DHB P DECOMP Set TWC. Tested to 1000 psi from above and passed. Test from below not feasible. 04:30 - 07:30 3.00 BOPSU DECOMP Changeout Top 2-7/8" Pipe Rams with 2-7/8" x 5-1/2" Variable Rams in order to pull the 4-1/2" Tubing. M/U floor valve to 4-1/2" landing joint and RIH and screw in to hanger and prepare to test 4-1/2" Rams, BOP stack and floor valve with landing joint. 07:30 - 08:00 0.50 BOPSU DECOMP Pressure test BOP Stack, Variable Rams, Blinds, and Floor Valve, 250-psi low and 3,500-psi high. All good tests. 08:00 - 09:30 1.50 BOPSU DECOMP RID test equipment, pull test joint, and RlU 4-1/2" tubing handling equipment. 09:30 - 10:00 0.50 BOPSU DECOMP Wait on DSM to pull the TWC--the DSM valve crew were held over on a job at DS-1. Load 7" lubricator into Pipe Shed and prepare to P/U DSM Lubricator. 10:00 - 12:30 2.50 FISH P DECOMP P/U Lubricator extension and install in BOP; close bag around extension. P/U DSM Lubricator and Install on extension; RIH and screw into TWC. Pull TWC and well is on vacuum. RID DSM Lubricator; open Hydril bag and pull lubricator extension. 12:30 - 13:00 0.50 FISH P DECOMP P/U 1-joint of 3-1/2" DP and MIU to XO to 4-1/2" TDS. M/U Floor valve to pumping swivel and M/U to drill pipe, connect to fill line, and RIH and screw into Hanger. Hold PJSM to pull tubing hanger. P/U on Drill pipe and hanger pulls free with 80K, then string comes steady at 75K. 13:00 - 14:30 1.50 FISH P DECOMP Secure and cut SSSV control lines. Fill hole with 47-Bbls seawater. B/O tubing hanger and UD. B/O Floor Valve and flowline and UD DP joint. Prepare to POH and UD 4-1/2" tubing using tugger restraint safety strap. 14:30 - 17:30 3.00 FISH P DECOMP POH and UD 4-1/2" tubing through Pipe Shed and spool up 2 bare SS control lines. Reach HES SSSV HEX-nipple at Printed: 8/21/2006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/3/2006 14:30 - 17:30 3.00 FISH P DECOMP 1710-hours. Recover 54-SS bands and 50-jts of 4-1/2" tubing. All joints have internal corrosion. RID Schlumberger pneumatic Spooler. 17:30 - 20:00 2.50 FISH P DECOMP Continue POH and UD 4-1/2" tubing to the Chem Cut @ 4100', Nordic 3 RKB. Recover 46 full joints and 24.28' cut joint. Cut at 24.28' in on joint # 97 putting cut at - 4,097' MD. Cut is clean. 20:00 - 22:30 2.50 FISH P DECOMP Bring BHA components to Rig Floor. M/U BHA #3. 22:30 - 00:00 1.50 FISH P DECOMP RIH wI BHA #3 on 3-1/2" DP to top of stub @ -4,097' MD. 8/4/2006 00:00 - 03:00 3.00 FISH P DECOMP RIH wI BHA #3 on 3-1/2" DP to top of stub @ -4,097' MD. 03:00 - 03:15 0.25 FISH P DECOMP Tag Stub @ 4063' MD. Swallow and grab stub. P/U to ensure fish is on. Fish is on. 03:15 - 04:15 1.00 FISH P DECOMP Shear out Pump-out Sub. Circulate 150 Bbls the long way taking returns to the Pits. Returns are clean. 04:15 - 08:00 3.75 FISH P DECOMP Overpull 18,000 - Ibs and perform blind backoff. Broke over at -5,200-lb-ft. Checked again and torque was -3,OOO-lb-ft. POH with fish (30k # of extra weight). SIB 3-1/2" DP and 4 stands of 4-3/4" DCs, and B/O Overshot and Grapple with cut joint. 08:00 - 13:30 5.50 FISH P DECOMP POH and UD 4-1/2" tubing through Pipe Shed, counting all joints and jewelry. Recover -18' cut joint, 1-GLM with pup joints, and 58 full joints of 4-1/2" tubing. A tangle of SSbands and IBP internals was found in the collar of the 42-nd joint in this recovery. The joint was cut apart and that is all that was found from the IBP. None of the hard metal parts have been recovered. A total of 153 full joints have been recovered along with 4 cut-offs for 155 total joints, which places the top of the collar of the backed off joint at 6,524'. (Slick-line found the top @ 6,527' SLMD from Kelly Bushing, see Operation comments at 2030-hrs, below). 13:30 - 14:00 0.50 FISH P DECOMP Clear and clean rig floor. Move 4-1/2" tubing out of Pipe Shed and place on sills on top of Herculite liner, plugging ends with Absorb. 14:00 - 17:00 3.00 FISH P DECOMP NID Riser and Flowline. NIU Shooting Flange, load Slick-line equipment into Rig. 17:00 - 20:30 3.50 FISH P DECOMP NIU 15' Slick-line riser to Shooting Flange. P/U and install Slick-line BOP. Connect 3.5" flat bottom drift, wire brush and 3.805" gage ring and M/U to Slickline. P/U and install Lubricator and prepare to RIH looking for obstructions in the remaining 4-1/2" tubing. 20:30 - 22:30 2.00 FISH P DECOMP RIH wI 3.805" gauge ring and 3.5" flat bottom drift. Tag top of 4-1/2" @ 6,527'. Tag fish at uppermost X-Nipple @ 8912' MD. Push fish to X-Nipple @ 8945' MD. Cannot push fish past 8945' MD. Experienceing overpull. POH w/75lbs. of overpull. Loose fish on the way out of hole somewhere near GLM #1 @ 7327' MD. 22:30 - 23:00 0.50 FISH P DECOMP Attempt to pressure up on fish and blow it out tailpipe. Pumped @ 3 BPM, no sign of pressure increase. Shut down pumps. 23:00 - 00:00 1.00 FISH P DECOMP RIH wI LIB to tag fish. Tag fish @ -7327' MD. Tag hard three times. Moved fish - 10'. POH wI LIB. No signs on of metal rod of IBP on the LIB. LIB indicates hitting a rubber portion of the IBP remains. 8/5/2006 00:00 - 03:00 3.00 FISH P DECOMP Wait on SL tools. RIH wI SL Grapple to attempt spearing the IBP. Drift outside Tubing Tail to 9,909' MD. No sign of Fish. IBP must have dropped out of Tubing Tail. POH wI SL Grapple. Printed: 8/21/2006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/5/2006 00:00 - 03:00 3.00 FISH P DECOMP 03:00 - 07:00 4.00 DHB P DECOMP RIH wI XXN Plug. Set Plug in XN Nipple @ 9865' MD. POH wI SL. 07:00 - 10:00 3.00 DHB P DECOMP Set plug, but the Slick-line tools keep hanging up in the X-nipple immediately above the XN-nipple. Work Slick-line hard up through 4-1/2" hanging up on each collar. 10:00 - 11 :00 1.00 FISH P DECOMP POH and UD Plug running tool. XN plug had not set, so UD running tool and plug. 11 :00 - 13:00 2.00 FISH P DECOMP P/U Drift and junk basket and RIH to clear debris from 4-1/2" tubing in preparation to RIH with E-line String Shot and Chemical Cutter. While POH @ 1245-hrs with Slick-line, started pulling hard @ 5,500' (+1-), suspect more IBP guts. Continue POH. Found nothing. 13:00 - 15:00 2.00 FISH P DECOMP P/U and M/U 7" Junk Basket and RIH and tag out on top of 4-1/2" @ 6425' which is the same depth calculated from the recovered tubing string. POH, found one piece of metal -1" in dia and 1/4" thick. 15:00 - 16:30 1.50 FISH P DECOMP P/U and M/U 3.80" Drift and Junk Basket and RIH to enter 4-1/2", find it at 6,425', and continue on in and stack out hard @ 9,815'. Confer with town engineer, Schlumberger E-line engineer and Wells Group PE Slick-line coordinator and POH to P/U 3.625" Drift with brush and 2.25" swedge. 16:30 - 17:15 0.75 FISH P DECOMP P/U and M/U 3.625" Drift, 3.5" Wire Brush, 2.25" Swedge and RIH to attempt to get out the WLEG. TD for the run is 10,016' without any problems. Decide to POH and RID Slick-line equipment and RlU E-liners. 17:15 - 20:30 3.25 FISH P DECOMP POH rig down slick-line equipment. 20:30 - 23:30 3.00 FISH P DECOMP RlU E-Line and RIH wI String Shot. CCL discovered that the depth of the pup joint below GLM #2 is off 34' (Documented as bottom of pup @ 7344' MD ,Actual depth 7310' MD). Shoot String Shot from 9,729' ELMD to 9,741' ELMD (these depths are correlated to Nordic 3 RKB of 28.97'). POH wI spent String Shot. 23:30 - 00:00 0.50 FISH P DECOMP M/U SLB Chemical Cutter and carry it to the Floor. 8/6/2006 00:00 - 03:00 3.00 FISH P DECOMP RIH with Chem Cutter, tag top of 4-1/2" at 6,528' ELMD (from Nordic 3 RKB) and continue on in and cut 4-1/2" tubing at 9,739' (from Nordic 3 RKB), which is in the middle of the first full joint above the top X-nipple. Good Rig Floor indication of Chemical Cutter detonation. 03:00 - 07:00 4.00 FISH P DECOMP POH wI Chem Cutter. Unable to move Chem Cutter. Pulling 2450 - Ibs of tension, no sign of movement. Jars working but are not helping. Attempt to work free, no success. Pump seawater at 1, 1.5, 2, 3, and 4 BPM while static. Max pressure reached was 900 psi. Attempt to pull free, no success. Pump 2-BPM @ 300 psi while trying to pull free, no success. Line wiper leaking. Replace rubber. Use both pumps to get to 10-BPM to pressure up to 2000 psi while E-line is static. Took 67-Bbls @ 10-BPM to get to 2000-psi. Bleed off to O-psi, set off jars three times and the Chem Cutter pulls free. 07:00 - 10:30 3.50 FISH P DECOMP POH with Chem Cutter, SID and wait for 1-hour with Chem Cutter at 200' below Rig Floor. Conduct PJSM for RID Chem Cutter and RID E-Line equipment. 10:30 - 12:30 2.00 FISH P DECOMP Clear all non-essential personnel and allow E-liners to proceed Printed: 8/2112006 10:05:33/W1 . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/6/2006 10:30 - 12:30 2.00 FISH P DECOMP with RID the Chem Cutter. Hold Chem Cutter for 1-hour, 200' below surface. Rig Floor clear of Chem Cutter @1100-hours. Continue to RID E-line equipment. 12:30 - 13:30 1.00 FISH P DECOMP PJSM. N/D Shooting Flange. 13:30 - 14:30 1.00 FISH P DECOMP PJSM. N/U Riser and changeout tubing handling equipment. 14:30 - 16:00 1.50 FISH P DECOMP PJSM. P/U and M/U BHA #4: 3.947" Itco Spear wI packoff, Lubed Bumper Sub, Oil Jars, and Pump-out Sub. RIH on 4-stands of DCs from Derrick, re-torquing all connections to 10,500-lb-ft. 16:00 - 20:00 4.00 FISH P DECOMP RIH BHA #4 on DP from Derrick, re-torquing all connections to 10,500-lb-ft. Continue RIH with DP from Pipe Shed. 20:00 - 20:30 0.50 FISH P DECOMP RIH wI BHA #4 and tag top of Stub @ 6526'. Swallow Stub to 6534'. Overpull36, 000 -Ibs, no movement. OverpuIl50,000- Ibs, jars function and tubing comes free. 20:30 - 21 :30 1.00 FISH P DECOMP Circulate 260 Bbls of seawater @ 4 BPM and 350 psi. 21 :30 - 00:00 2.50 FISH P DECOMP POH wI BHA #4, SIB DP in Derrick and UD 4-1/2" Tubing using safety strap. 8/7/2006 00:00 - 02:00 2.00 FISH P DECOMP POH wI BHA #4 and SIB DP in Derrick. 02:00 - 02:30 0.50 FISH P DECOMP BHA # 4 at surface. Break and UD BHA #4. 02:30 - 06:30 4.00 FISH P DECOMP POH and UD 4-1/2" Tubing using safety strap. Numbering joints as they come out of hole. Recovered 76 full joints, 1-cutoff joint 21.1' long and 1-GLM. 06:30 - 11 :30 5.00 FISH P DECOMP RIH wI 2-7/8" DP from Derrick to clear it rom the Rig Floor and prepare to POH and UD same. 11 :30 - 17:00 5.50 FISH P DECOMP POH and UD 2-7/8" DP then Unload 2-7/8" PAC DP from Pipe Shed and place on pipe sills for transport. 17:00 - 17:30 0.50 DHB N DECOMP Load Baker Hydraulic-set 7",26# RBP and running tool into Beaver Slide and bring to Rig Floor. Hold PJSM to P/U and M/U RBP. 17:30 - 23:15 5.75 TA N DECOMP RIH wI RBP, DCs, and 3-1/2" DP. Set RBP @ 8513' MD (23' in on joint # 252). 23: 15 - 00:00 0.75 TA N DECOMP PIT RBP to 2500 psi. Good Test. No apparent Casing leak. Pressure up to 3500 psi for 30 minutes and chart. Good test. 8/8/2006 00:00 - 02:00 2.00 TA N DECOMP Cut and Slip Drill Line. 02:00 - 06:00 4.00 TA N DECOMP POH wI 3-1/2" DP and Collars, laying down and removing it from the pipe shed. 06:00 - 13:00 7.00 TA N DECOMP Continue LD and remove workstring. Clear pipe shed 13:00 - 21 :30 8.50 TA N DECOMP Load, strap, and drift 4 1/2" kill string. Empty Tiger Tank. 21 :30 - 00:00 2.50 TA N DECOMP RIH wI 4-1/2" IBT Kill String (WLEG, XN-Nipple, 200 jts.) to 8323' MD. 8/9/2006 00:00 - 04:30 4.50 TA N DECOMP RIH wI 4-1/2" IBT Kill String (WLEG, XN-Nipple, 200 jts.) to 8323' MD. 04:30 - 06:00 1.50 TA N DECOMP Reverse Circulate 290 Bbls of 9.8 ppg brine @ 4 BPM and 300 psi. Final circulation pressure of 100 psi @ 4 BPM 06:00 - 09:00 3.00 TA N DECOMP M/U and Land Tubing Hanger. PU st of 130 K #'s, SO wt of 95 K #'s. RILDS. Test TWC to 1000 psi from above and from below. OK. Back out landing joint, close rams and secure well. 09:00 - 00:00 15.00 TA N DECOMP Standby for orders re: Field Shutdown. 8/10/2006 00:00 - 06:00 6.00 TA N DECOMP Standby for orders re: Field Shutdown. 06:00 - 00:00 18.00 TA N DECOMP Field Shutdown. Rig maintenance. Make preperations to hook rig up to High Line Power. 8/11/2006 00:00 - 06:00 6.00 TA N DECOMP Field Shutdown. Rig maintenance. Make preparations to hook Printed: 8/21/2006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/11/2006 00:00 - 06:00 6.00 TA N DECOMP rig up to High Line Power. 06:00 - 12:00 6.00 TA N DECOMP Field Shutdown. Rig maintenance. Make preperations to hook rig up to High Line Power. 12:00 - 14:00 2.00 TA N DECOMP Recieve word from town to proceed in orderly fashion to button up existing projects, and resume work. Prepare for BOPE testing. Call AOGCC and notify of BOPE testing. Test witness waived by John Crisp 14:00 - 20:00 6.00 TA P DECOMP Test BOPE. 250 psi low, 3500 psi high. Test with 31/2" and 4 1/2" test joint for the rams. 20:00 - 20:30 0.50 TA P DECOMP M/U 7" Lubricator extension and stab into BOPE. Close Hydril. Check IA pressure. Pressure is zero. 20:30 - 23:00 2.50 TA P DECOMP Wait on Lubricator from Wells Group. 23:00 - 00:00 1.00 TA P DECOMP M/U Lubricator and TWC pulling tool. Pull TWC. Pressures are at 0 psi. UD Lubricator, pull and UD Lubricator extension. 8/12/2006 00:00 - 01 :00 1.00 TA P DECOMP M/U Landing joint and crossover and screw into Hanger. Break out LDS. Unland Hanger. P/U = 130k #. UD Tubing Hanger. 01 :00 - 02:30 1.50 TA P DECOMP POOH w/1 stand of 4-1/2" Tubing. M/U HES RTTS-Storm Valve wI crossover and RIH 1 stand and set. POOH w/1 stand and retrieving head and SIB in Derrick. 02:30 - 03:30 1.00 WHSUR P DECOMP M/U Packoff Pulling Tool, RIH to engage Packoffs, and POOH through the Stack. M/U new packoff assembly, RIH, and set. Test Packoffs to 4300 psi. Passed PIT. 03:30 - 04:30 1.00 TA P DECOMP P/U retrieving head on stand of 4-1/2" and RIH to retrieve RTTS-Storm Valve. POOH and UD RTTS-Storm Valve. 04:30 - 12:00 7.50 TA P DECOMP POOH and UD 4-1/2" Kill String wI XN Nipple, pups and WLEG. 12:00 - 13:00 1.00 TA P DECOMP C & C rig floor, prep to RIH w/3 1/2" DP 1 x 1 from pipe shed. 13:00 - 20:00 7.00 TA P DECaMP Install wear ring. PUMU Baker retrieving head for RBP. RIH drifting as pick up from pipe shed 1 x 1 as RIH. 20:00 - 21 :00 1.00 TA P DECaMP Attempt to switch to High-Line power. Will have to wait until morning due to a problem with the protective metering. 21 :00 - 22:00 1.00 TA P DECOMP Tag RBP and pull 150k # to pull plug. Let elements in RBP relax for 5 minutes. RIH past 8513' MD to ensure plug was pulled. POH, slow for first 200', SIB DP in Derrick. 22:00 - 00:00 2.00 TA P DECOMP POH wI RBP standing 3-1/2" DP back in Derrick. 8/13/2006 00:00 - 01 :30 1.50 TA P DECOMP POH wI RBP standing 3-1/2" DP back in Derrick. Load well with 20 Bbls of seawater + double displacement of DP every hour while POH. Losses - 37 Bbls/hr. 01 :30 - 02:00 0.50 TA P DECOMP Load IA with 20 Bbls of seawater. Well U-Tubing. Pump 20 Bbls down DP to acheive balance. 02:00 - 02:30 0.50 T A P DECOMP POH wI RBP standing 3-1/2" DP back in Derrick. Losses - 30 Bbls/hr. 02:30 - 03:00 0.50 TA P DECOMP RBP at surface; break and UD RBP. Bring components of dress off BHA to Rig Floor. 03:00 - 04:30 1.50 CLEAN P DECOMP M/U dress off BHA ( Burn shoe, Dress off Mill, 2 Boot Baskets, Bit sub, Bumper Sub, Jars, and 6 DCs). Losses - 36 Bbls/hr. 04:30 - 08:30 4.00 CLEAN P DECOMP RIH wI Tubing Stub dress off BHA on DCs and 3-1/2" DP. Filling hole every hour wI seawater. 08:30 - 09:30 1.00 CLEAN P DECOMP BHA @ 9727'. PU wt of 190K #'s, SO wt of 125K #'s. Fill hole w/21 Bbls and secure well to attempt to convert rig to High Line power. Unsuccessful. Breakers tripping in conversion trailer. Convert Rig camp to High Line power @ 10:30 am. 09:30 - 11 :30 2.00 CLEAN P DECOMP PU joint # 295 and tag top of tubing stub @ 9735' MD. PU and Printed: 8/21/2006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/13/2006 09:30 - 11 :30 2.00 CLEAN P DECOMP establish milling parameters of 4 BPM, 80 RPM, 530 psi pump pressure. RBIH slowly and dress off tubing stub. Could see 2.2' from top of stub with internal mill to tag with flat faced upper mill. Mill off wI 5000# WOB, slight torque increases of 1000 ft-Ibs. Repeat 3 times. Dry tag and confirm. Losses while milling for 2 hours @ 4 Bpm of 90 Bbls. 11 :30 - 13:00 1.50 CLEAN P DECOMP Pump 25 Bbls of Hi-Vis sweep, and circulate surface to surface. Slight burp of gas at surface when bottoms up @ surface. Continue to circulate. Small amounts of metal cuttings to surface. Divert pill to cuttings tank. Circulate to good seawater in and out. Flow check well, trace gas bubbling and Fluid level falling. Bullhead 50 Bbls seawater on formation, 5 BPM, 1800 psi. POOH 5 stands, load hole and secure well. Switch rig to High Line power. 13:00 - 17:30 4.50 CLEAN P DECOMP Flowcheck well, fluid level falling, no bubbling, POOH standing back 3 1/2" DP in Derrick, pumping across the top to keep hole full. Losses of 94 Bbls, displacement of 35 bbls, losses to formation of 13 Bbls/Hr. 17:30 - 18:00 0.50 CLEAN P DECOMP Break out Dress Mill BHA. Burn shoe on face of wash pipe indicates that we milled 2.5" into side of the top of the stub. We did not get over the stub, and no wear on internal polish and dress off mill. Send to Baker shop to get a new burn shoe with more tape, not flat bottomed and less aggressive. 18:00 - 20:00 2.00 CLEAN P DECOMP Wait on new burn shoe from Baker. 20:00 - 21 :00 1.00 CLEAN P DECOMP MIU dress off BHA ( Cut lip bum shoe, Dress off Mill, 2 Boot Baskets, Bit sub, Bumper Sub, Jars, and 6 DCs). 21 :00 - 23:30 2.50 CLEAN P DECOMP RIH wI Tubing Stub dress off BHA on DCs and 3-1/2" DP. Filling hole across the top as RIH. 23:30 - 00:00 0.50 CLEAN P DECOMP BHA @ 9730'. PU wt of 185K #'s, SO wt of 125K #'s. PU joint # 295 and tag top of tubing stub @ 9735' MD. PU and establish milling parameters of 4 BPM, 70-100 RPM, 540 psi pump pressure. RBIH slowly and dress off tubing stub. Mill off wI 5000# WOB, slight torque increases of 4000 ft-Ibs. RIH to 9747' which would work Dress off Mill 3' into Tubing. Repeat 3 times. Milled off - 3' off of Tubing Stub. New Stub depth is - 9738'. Losses while milling for 1 hour @ 4 Bpm of 23 Bbls. 8/14/2006 00:00 - 00:30 0.50 CLEAN P DECOMP BHA @ 9730'. PU wt of 185K #'s, SO wt of 125K #'s. PU joint # 295 and tag top of tubing stub @ 9735' MD. PU and establish milling parameters of 4 BPM, 70-100 RPM, 540 psi pump pressure. RBIH slowly and dress off tubing stub. Mill off wI 5000# WOB, slight torque increases of 4000 ft-Ibs. RIH to 9747' which would work Dress off Mill 3' into Tubing. Repeat 3 times. Milled off - 3' off of Tubing Stub. New Stub depth is - 9738'. Losses while milling for 1 hour @ 4 Bpm of 23 Bbls. 00:30 - 01 :30 1.00 CLEAN P DECOMP Pump 30 Bbls of Hi-Vis sweep, and circulate surface to surface at 6 BPM at 1000 psi. Small amounts of metal shavings to surface. Divert pill to cuttings tank. Circulate to good seawater throughout well. 01 :30 - 03:00 1.50 CLEAN P DECOMP Flowcheck well, fluid level falling, no bubbling. Losses of 25 Bbls during circulation. Cut and Slip Drill Line. 03:00 - 07:00 4.00 CLEAN P DECOMP POOH wI Dress off BHA standing back 3 1/2" DP in Derrick, pumping across the top to keep hole full. 07:00 - 08:00 1.00 CLEAN P DECOMP Stand back DC's, inspect burn shoe and mills. Indications of Printed: 8121/2006 10:05:33 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: 8/14/2006 07:00 - 08:00 1.00 CLEAN P DECOMP swallowing stub and wear on face of dress off mill. Break out Dress Off BHA. 08:00 - 09:30 1.50 CLEAN P DECOMP PUMU shear pin guide assy wI 3.70" junk mill on 5 jts of 2 7/8" DP, 7" scraper, 4 3/4"00t basket, bit sub, bumber sub, jars, 6 ea 4 3/4"DC's. 09:30 - 12:30 3.00 CLEAN P DECOMP RIH wI mill-scraper BHA on 3 1/2"DP from Derrick. 12:30 - 14:00 1.50 CLEAN P DECOMP Tag tubing stub @ 9740', shear guide 2 w/7K down and RIH wI mill to 9870'. Scraper to 9710'. Pump 25 Bbls of Hi-Vis sweep, and circulate out of hole from top of tubing stub. RBIH dry to 9780', slight bobble as pass mill into tubing stub. 14:00 - 17:00 3.00 CLEAN P DECOMP POOH wI scraper BHA standing back in Derrick, keeping hole full by pumping across the top. Losses @ 16 BblslHr 17:00 - 19:30 2.50 CLEAN P DECOMP Break out lay down 4 3/4" DC's, lay down BHA and 2 718" PAC DP. 19:30 - 22:00 2.50 CLEAN P DECOMP Monitor Well and wait for new crew to arrive from Kuparuk. 22:00 - 23:00 1.00 CLEAN P DECOMP PJSM wI new crew. Load Pipe Shed. RID Eckels and RlU Spinners. 23:00 - 00:00 1.00 EVAL P DECOMP M/U and RIH wI RTTS on 3-1/2" DP to 9700' MD to test 7" casing. 8/15/2006 00:00 - 03:00 3.00 EVAL P DECOMP RIH wI RTTS on 3-1/2" DP to 9700' MD to test 7" casing. 03:00 - 05:30 2.50 EVAL P DECOMP Boot in upper Basket on Riser failed releasing 3 Bbls of seawater into cellar and pad. All proper notifications were made. Proceed to clean up with ACS and Super Sucker. 05:30 - 06:15 0.75 EVAL P DECOMP Set RTTS @ 9700' MD. Pressure up to 3500 psi and chart. Pressure Test Passed. Bleed pressures to 0 psi. Pull RTTS and let elements relax for 5 minutes. 06:15 -11:30 5.25 EVAL P DECOMP POH wI RTTS UD 3-1/2" DP and unloading it from the pipe shed. 11 :30 - 12:30 1.00 EVAL P DECOMP Secure well. Hold meeting with rig crew going OFF Tour @ noon and rig crew coming ON Tour. Discuss plan forward. Discuss spill incident. Re-enforce BP committment to HSE, discuss response of crew and proper procedures for responding to spills. 12:30 - 18:00 5.50 EVAL P DECOMP POOH laying down 3-1/2" DP and unloading it from the pipe shed. 18:00 - 18:30 0.50 EVAL P DECOMP UD 7" RTTS packer. 18:30 - 22:30 4.00 RUNCO RUNCMP Clear and clean rig floor and prepare to RIH wlcompletion string. 22:30 - 00:00 1.50 RUNCO RUNCMP PUMU tailpipe assy. and 7" Baker S-3 permanet packer assembly. Back off tubing collar on top of first joint, apply Baker-Lok and makeup collar back on joint. Baker-Lok'd all thread connections below packer. MU connections to optimum torque value of 4440 ft./lbs. using torque turn eqpt. 8/16/2006 00:00 - 00:30 0.50 RUNCO RUNCMP RIH w/4-1/2" 12.6# 13CR80 completion tubing and jewelry. Making up connections using torque turn eqpt. and single joint compensator. Torquing connections to optimum torque of 4440 ft./lbs. and applying "Jet Lube Seal Guard" thread compound as needed. 00:30 - 01 :00 0.50 RUNCO RUNCMP Pre-job safety meeting with new crew coming on tour. Reviewed 13CR80 Handling and Running procedure with all crew. 01 :00 - 06:00 5.00 RUNCO RUNCMP Resume RIH w/4-1/2" 12.6# 13CR80 completion tubing and jewelry. Making up connections using torque turn eqpt. and Printed: 8/21/2006 10:05:33 AM . . Legal Well Name: Commòn Well Name: Event Name: Contractor Name: Rig Name: G-21 G-21 WORKOVER NORDIC CALISTA NORDIC Start: 7/26/2006 Rig Release: 8/17/2006 Rig Number: 3 Spud Date: 10/9/1995 End: single joint compensator. Torquing connections to optimum torque of 4440 ft.llbs. and applying "Jet Lube Seal Guard" thread compound as needed. Running speed at 0400-hrs. is -15 jts.lhr. 58 jts. RIH at 0530-hrs. 06:00 - 10:30 4.50 RUNCMP Continue RIH wI 13Cr80 completion, keeping hole full wI seawater, losses @ =1- 15 Bbls/Hr. 10:30 - 11 :00 0.50 RUNCMP PUMU GLM #4 wI DCK-2 SV. Change out damaged collar on pup joint above GLM. 147 joints in hole. 11 :00 - 15:00 4.00 RUNCMP Continue RIH wI 13Cr80 completion, keeping hole full wI seawater, losses @ =1- 15 Bbls/Hr. 15:00 - 16:00 1.00 RUNCMP PUMU joint 228 with PU wt of 150K #'s, SO wt of 115K #'s. Measure as RIH wI joint 228. Tag tubing stub and shear screws in overshot with 7K #'s, RIH 4 ft and stack out 15 K. Repeat and mark pipe, lay down 3 joints of 41/2" Cr80 Tbg. 16:00 - 18:00 RUNCMP PUMU 4 each pup joints to space out 33.72'. PUMU joint # 226 RIH. Screw TIW valve into tbg hanger to check threads, then remove. PUMU 31/2" DP landing joint and tubing hanger. Hanger has 41/2" TC II threads top and bottom. RIH 20'. RKB of 26.78'. Drift TIW valve with ball and rod. MU TIW valve, head pin and circulation hose. 18:00 - 19:00 1.00 RUNCO RUNCMP Set slips on landing joint, close TIW valve and annular preventer to secure well. Switch rig from High Line power to generators. Headpin leaking. Laid landing jt. down. Made up headpin and TIW valve and picked up landing jt. Closed bag around tubing with hanger above rotary table. 19:00 - 20:30 1.50 RUNCO RUNCMP Rev. circ. in 175 Bbls. seawater treated with EC1124A corrosion inhibitor taking returns to rig pits. 20:30 - 21 :00 0.50 RUNCO RUNCMP Remove landing jt., drop ball and rod. Replace landing jt. Land tubing hanger. RILDS. 21 :00 - 21 :45 0.75 RUNCO RUNCMP Pressure up tubing to 3500 psi to set packer and test tubing. Held 3500 psi for 30 minutes and charted test. Bleed off pressure to 1500 psi. 21 :45 - 22:45 1.00 RUNCO RUNCMP Rig up lines to pressure test IA and shear DCK valve. 22:45 - 00:00 1.25 RUNCO RUNCMP Pressure test packer tro 3500 psi and chart same. Good test. Bleed tubing pressure from 1500 psi and shear open DCK valve. 8/17/2006 00:00 - 02:00 2.00 RUNCO RUNCMP LD 3-1/2" DP landing jt. FMC dry rod set TWC. PIT TWC from above and below to 1000 psi. 02:00 - 06:00 4.00 RUNCO RUNCMP ND BOPE. Clean rig and prep to RDMO. 06:00 - 10:00 4.00 RUNCO RUNCMP NU Tree. Test hanger packoff void to 5000 psi. Test tree to 5000 psi and chart. 10:00 - 13:00 3.00 RUNCO RUNCMP RU LRS, pump 75 Bbls of diesel into IA and U-tube to tubing side for 1 hour. 13:00 - 15:00 2.00 RUNCO RUNCMP Set BPV. Secure tree. Release the rig @ 15:00 hours. Move to K pad. Printed: 8/21/2006 10:05:33 AM TREE: 4" CAMERON WELLHEAD: FMC ACTUATOR: BAKER KB. ELEV : 70.05' BF. ELEV = 38.4' KOP= Max Angle: Datum MD : Datum 1VD = . 96 @ 10683' 9975' 8800'SS G-21 DRLG DRAFT . 2211' H 4-1/2"HESXNIP,ID=3.813" I GAS LIFT MANDRELS ST MD 1VD DEV TYÆ VLV LA TCH PORT DATE 4 3408 3330 1 KBG-2 DOME BK 16 08130106 9-518" CSG, 40#. NT-80, ID : 8.835" I 3 6121 5850 39 KBG-2 SO BK 20 08130106 2 8412 7600 42 KBG-2 DMY SBK-2 1" 08/16/06 1 9572 8478 40 KBG-2 DMY SBK-2 1" 08/16/06 9641' 9662' 4-1/2" HES X NIP, ID = 3.813" 7" X 4-1/2" BKR S-3 A<R, ID = 3.875" 9758' 7" X 4-1/2" UM Overshot TOP OF 7" CSG I 9838' 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID: 3.958" 9878' I TOPOF4-1/2"LNR 10441' 7" CSG, 26#, L-80, ID = 6.276" I PERFORA TION SUMMARY REF LOG: SÆRRY SUN MWD ON 10195 ANGLEATTOP PERF: 93 @ 10790' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPNISQZ DA TE 2-314" 4 10790 -11075 S 10/16/99 2-112" 4 11850 -12150 0 02/17102 3-3/8" 6 12580 - 13240 0 02/13/96 14-112" LNR, 12.6#, L-80, .0152 bpf, ID: 3.958" I I PBTD DATE 11/13/95 09/26/01 02/17102 05/28103 06103/03 06/08/05 REV BY COMMENTS ORIGINAL COM PLETION RN/TP CORRECTIONS JAFITLH ADD ÆRFS JCfvVTLP PULL IBP, GL V C/O KSB/TLH STRADDLE A<R PA TCH GJB/PJC IBP SET DA TE REV BY COMMENTS 12102/05 CfvVTLH WH CORRECTION 02/17/06 WRRlPA IBP PULU FISH LEFT 08/16/06 MHlJM NORDIC 3 RWO 08/30/06 JCIvVPAG GLV C/O 08/31106 JCIvVPAG X NIP CORRECTION 9686' 9750' 9812' 9822' 9845' 9865' 9878' 9834' 10451' 13272' 13359' 4-1/2" HES X NIP, ID = 3.813" I 4-1/2" 12.6# Tubing Stub I 4-1/2" HES X NIP. ID = 3.813" I 7" X 4-1/2" BKR S-3 A<R, ID = 3.875" I 4-1/2" HES X NIP, ID = 3.813" I 4-1/2" HES XN NIP, ID = 3.725" I 4-1/2" TTL WLEG I ELMD TT LOGGED 11121/95 7" X 4-1/2" TIW HYDRO A<R, ID: 3.875" FISH - 4-1/2" HALIBURTON CIBP MILL LOOSE - PUSH TO BTM PRUDHOE BA Y UNIT WELL: G-21 PERMIT No: "1951540 API No: 50-029-22604-00 SEC 12, T11 N, R13E, 2911' FSL & 2368' FEL BP Exploration (Alaska) ~u·.r ! . .'.......;...".\ ['~. '.t. é'.~.' [01 1" I\~ 'c)~,'J t.. t~\ LJ L . FRANK H. MURKOWSKI, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Doug Cismoski Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 ~q5_ISy.- Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-21 Sundry Number: 306-274 Dear Mr. Cismoski: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this "day of August, 2006 Encl. '~JJffjé IJ/t. igJ~r STATE OF ALASKA 1\, /j~ ALA. Oil AND GAS CONSERVATION COMM ION WGI\-- ~l So. /WOlP RECEIVED AUG I 4 2006 f)v< p-Y/(;/L APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 Alaska Oil &. r,ao: rnn.. " - ¡d'e r:i¡-': o Suspend o Operation Shutdown o Perforate o Time ExteMiehorage 1. Type of Req est: Abandon o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver 181 Other // Restart ODerations after Shutdown 2. Operator Name: 4. Current Well Class: / 5. Permit ¥D ri II Number BP Exploration (Alaska) Inc. ~ Development D Exploratory 195-15~ /? 3. Address: D Stratigraphic D Service 6. API Number: / P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22604-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU G-21 / Spacing Exception Required? DYes ~No 9. Property Designation: 110. KB Elevation (ft): 11. Field / Pool(s): ADL 028285 70' Prudhoe Bay Field / Prudhoe Bay Pool 12..... ...... ÞRESENTWELLCONDITIONSt.JMMARY /.' ... Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): Junk (measured): 13359 9009 13272 9006 8513 9878 Casina Lenath Size MD TVD Burst Collacse Structural Conductor 107' 20" 107' 107' 1490 470 Surface 3476' 9-5/8" 3509' 3497' 5750 3090 Intermediate 10569' 7" 1 0602' 9038' 7240 5410 Production Liner 2918' 4-1/2" 10441' - 13359' 9032' - 9009' 8430 7500 Perforation Depth MD (ft): I Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11850' - 13240' 8995' - 9006' 4-112", 12.6# L-80 8323' & 9738' - 9878' Packers and SSSV Type: 7" x 4-1/2" Baker 'S-3' packer I Packers and SSSV MD (ft): 9822' 13. Attachments: 14. Well Class after proposed work: /' D Description Summary of Proposal D BOP Sketch D Exploratory ~ Development D Service D Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencinç¡ Operations: August 11 , 2006 ~Oil DGas D Plugged D Abandoned 17. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Doug Cismoski, 564-4303 Printed Name Doug Cismoski Title Drilling Engineer Signature 1\_.#. ¿: /~" Prepared By Name/Number: Phone 564-4303 Date Terrie Hubble, 564-4628 t/ Commission Use Onlv Conditions of approval: Notify Commission so that a representative may witness I Sundry Number:'2.(ìt.P . óJ...7 <f D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance Other: RBDMS BFL AUG 172006 Subsequent Form Required: It> - APPROVED BY ~/6ß6 Approved Bv: THE COMMISSION Date Form 10-403 Revised 06/2006 V (/ '- ~bm~ In Duplicate ORIGINAL /' . STATE OF ALASKA . ALA OIL AND GAS CONSERVATION COM ION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 Ops Shutdown due to Field Shutdown 1. Type of Request: o Abandon o Suspend 181 Operation Shutdown o Perforate o Time Extension o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ~ Development D Exploratory 195-154 3. Address: D Stratigraphic D Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22604-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU G-21 Spacing Exception Required? DYes ~No 9. Property Designation: 110. KB Elevation (ft): 11. Field / Pool(s): ADL 028285 70' Prudhoe Bay Field / Prudhoe Bay Pool 12. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft):Effect¡Ve Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): Junk (measured): 13359 9009 13272 9006 8513 9878 Casinc Lenoth Size MD TVD Burst Collaose Structural Conductor 107' 20" 107' 107' 1490 470 Surface 3476' 9-5/8" 3509' 3497' 5750 3090 Intermediate 10569' 7" 1 0602' 9038' 7240 5410 Prodllction Liner 2918' 4-112" 10441' - 13359' 9032' - 9009' 8430 7500 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft): 11850' - 13240' 8995' - 9006' 4-112",12.6# L-80 8323' & 9738' - 9878' Packers and SSSV Type: 7" x 4-1/2" Baker 'S-3' packer I Packers and SSSV MD (ft): 9822' 13. Attachments: 14. Well Class after proposed work: o Description Summary of Proposal o BOP Sketch D Exploratory ~ Development D Service o Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencinc Ocerations: August9,2006 ~Oil DGas D Plugged D Abandoned 17. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact David Reem, 564-5743 Printed NamWd Reem Title Drilling Engineer Signature ~ n ~~ gir%f, Prepared By Name/Number: Phone 564-5743 Date Terrie Hubble, 564-4628 Commission Use Onlv I Sundry Number: Conditions of approval: Notify Commission so that a representative may witness D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance Other: Subsequent Form Required: APPROVED BY Approved By: COMMISSIONER THE COMMISSION Date Form 10-403 Revised 06/2006 Submit In Duplicate · TREE = CAMERON V\lELLHEAD = FMC ~' 'Ã~T¡j÷TÒ·R;;';··""··""·"8"ÄKER· .................................................................. KB. ELEV = 70.05' .................................................................. BF. ELEV = 38.4' .................................................................. 15.Qp...=.....................................~?~ª:. .~.~.~..~!Jg!~..'::..........:.@.J.-º.~.ª}:. Datum MD = 9975' .................................................................. Datum TVD = 8800' SS . G-21 SAFeOTE: GLMS: (CAMCO WIDK-1 DTM LATCH) SET M LATCH GLVS IN THE "OLD Sm..E" KBG- 2LS GLM, THE RUNNING HEAD NO-GO NEEDS TO DE MOVED UP 1 T2". GLM 10 IS J.IJJ". ··HORlZ WELL .. I TOP OF 4-112" LNR BARRIERS IN PLACE: 1. 7" RBP wI sand cap; tested to 3500psi 2. 9.8 ppg NaGI Kill Wt. Brine 3. TWG in kill string; tested to 1000psi up & down KILL STRING 4-1/2", 12.6# L-80 IBT, wI WLEG & XN Nipple, landed in 9.8ppg NaGI brine, wI 200' F/P 9·518" CSG, 40#, NT-80. ID = 8.835" H J509' 4-1/2", 12.6# L-80 IBT Kill String Minim um ID = 2.205" @ 3110' 2-718" HOWCO XN NIPPLE 8513' 9738' 7" RBP wi Sand Cap Top of Cut, 4-1/2" TBG I 911Z' 4-112" HES X NIP, ID = 3.813" 7" CSG, 26#, L-80, ID = 6.276" 1-1 I TOP OF 7" CSG H 9122' 7" X 4-112" BKR S·3 PKR, ID = 3.875" 91JI' 91JI' 14-112" TBG. 12.6#. L·80, .0152 bpf, ID = 3.958" 9111' 9845' --j 4-112" HES X NIP. ID = 3.813" I 9165' -1 4-112" HES XN NIP, ID = 3.725" I 9812' + I 4-1/2" ISP Junk 4- 112" TTL W LEG I 7" X 4-112" TM! HYDRO PKR, ID = 3.875" I 10441' I 7" CSG, 26#, L·80, ID = 6.276" I PERFORATION SUMMARY REF LOG: SPERRY SUN M1/IÆ) ON 10/95 ANGLE AT TOP PERF: 93 @ 10790' Note: Refer to Production DB for historical erf data SIZE SPF INTERVAL OPNISQZ DATE 2-3/4" 4 10790 - 11075 S 10116/99 2-1/2" 4 11850 -12150 0 02117,01)2 3-318" 6 12580 - 13240 0 0211 3/96 FISH - 4-112" HAUBURTON CIBP I MILL LOOSE· PUSH TO BTM I DATE 111'1185 09/26,01)1 02t1 7,01)2 OS/28,01)3 06,01)3,01)3 06,01)8,01)5 REV BY COMMENTS ORIGINAL COMPLETION RNITP CORRECTIONS JAF ITLH ADD PERFS JCMITLP PULL IBP, GL V C/O KSBITLH STRADDLE PKR PATCH GJBIPJC IBP SET DATE REV BY COMMENTS 12,01)2,01)5 CMITLH Wi CORRECTION 02t17,o1)6 RIP AG IBP PULL! FISH LEFT PRUDHOE BAY UNIT V\lELL: 0-21 PERMIT No: ~ 951540 API No: 50-029-22604-00 SEC 12, T11 N, R13E, 2911' FSL 8. 2368' FEL BP E2plonltion (IU..k.) G-21 (PTD # 1951540) Classified as Problem Well ) ) Subject: G-21 (PTD #1951540) Classified as Problem Well From: "Anders, Joe L" <anders22@BP . com> Date: Mon, 04 Apr 2005 20:15:49 -0800 To::."Wellman,·TaylorT." <taylor:wellman@BP.com>~ "GPB, GCl"AreaMgr" ." ¡ . <QPBGCITL@BP.com>, "GPB, GCl Wellpad Lead" <GPBGCIWellpadLead@BP.com>, "RÇ>ssberg, R Steven" <RossbeRS@BP.com>, IINSU, ADWWell~operationsSupeIVÍsor": . <NSUADWWellOperationsSupervisQr@JP.com>,"GPB,WellsOþtEn~" .:". . ". >:.,.. .' <GPBWellsOptEng@BP . com> , "AOßCC)i1i1 Regg (E-mail)" <.ïÏ1i1~regg@admin~state~ak..Ùs>~ "ApGCC Winton Aubert (E~mai1)" <wintori_~ubert@admin.state.ak.us>, "NSU, ADWWL &:. . Co~;pletion ,Supervisor"<N"SUAD,WWL&Comp~etionSupervisor@BP .~o~>, "GPI3'W ell"Pa~s:': " . :QFfG'~ <GPBW ellPaçlsDFp@BP .com>, "GPB,OpsMgr" <GPBOpsMgr@BP . com> '. " ...., : C~:"~SU ,ADWWell IntegrityEngineër"<NSUAI>WWellIntegritYÈngii1eer(@~P . com>, ~'Reeves, . " r>~nald F" <ReevesDf@BP.com>, "Mielke, Ro~ert'L." <robert.miellà~@BP ~com>, .' , .' All, Well G-21 (PTO #1951540) has sustained casing pressure on the IA and is classified as a Problem well. TIO's on 04/03/05 were 2310/2310/280. The plan forward for this well is as follows: 1. EL: RST with Borax, L&K to safe-out Attached is a wellbore schematic. Please call if you have any questions. «G-21.pdf» Joe Anders, P.E. Well Integrity Coordinator, BP Exploration, (Alaska) Inc. Work: 1-907-659-5102 Mobile: 943-1154 Pager: 659-5100, x1154 Email: NSUADWWelllntegrityEngineer@bp.com SCi-\NNED .JUl O? 2005 Content-Description: G-21.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 5/1 0/2005 8:05 AM ) TREE = 4" CAMERON W8..LHEAO = ClW ÄëÏ"i].\"TÖR ~.... . "'BÀ KËR KB. ELEV = 70.05' BF. ELEV = 38.4' KOP = ... 4529' Max. ~.~.~.e..:.......~.~.~...~..~?83: Datum MD = 9975' OatumTVO = 8800' SS 1 3-112" lBG, 9.3#, L-80, 10= 2.380" l-i 3089' 1 2-7/8" lBG, ??#, ????, 10 = 2.441 1-1 3110' 9-5/8" CSG, 40#, NT-80, 10 = 8.835" 1-1 3509' ~ Minimum ID = 2.205" @ 3110' 2-7/8" Howe 0 XN NIPPLE 7" CSG, 26#, L-80, 10 = 6.276" l-i 9838' I TOP OF 7" CSG l-i 9838' 14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" 1-1 9878' I TOPOF4-1/2"LNR l-i 10441' 7" CSG, 26#, L-80, 10 = 6.276" 1-4 10602' ~ ÆRFORA TON SUIVMARY REF LOG: SPERRY SUN MNO ON 10/95 ANGLE AT TOP PERF: 93 @ 10790' Note: Refer to Production DB for historical perf data SIZE SPF INTER\! AL OPNlSQZ OA TE 2-3/4" 4 10790-11075 S 10/16/99 2-112" 4 11850-12150 0 02/17/02 3·318" 6 12580 - 13240 0 02/13/96 G-21 ~ ~ . I ) SAFETY NOTE: G..MS: (CAMCO W/DK-1 BTM LATCH) SET1" 81M LATCHGLVS IN THE "OLD STYLE" KBG- 2LS GLM, THE RUNNING HEAD NO-GO NEEDS TO BE MOVED UP 1/2". GLM ID IS 3.833". **HORlZWB..L ** 1584' 1-14-112" BAKER PKR PATCH, 10=2.38" (06/03/03) 1589' 1-i2-718" X 3-1/2" XO, 10 = 2.441" 1 2154' 1-i4-112" SSSV HES HXO LAND NIP, 10= 3.813" 1 3089' l-i 3-112" X 2-7/8" XO, 10 = 2.380" 1 3091' 1-14-112" llEBACK SLV w /LOCATOR, [) = 2.380" I 3099' 1-14-112" KB STRDL A<R PATCH, 10 = 2.38" (06/03/03) 1 3110' l-i 2-7/8" HOVVCO XN NIP, 10 = 2.205" (06/03/03) 3112' I-IWL83, 10 =2.400" (06/03/03) 1 . GAS LIFT MA NORELS ST MO lVO DEV lYÆ VLV LATCH PORT DATE 2 4254 4170 0 KBG-2LS D\IIY INT 0 OS/27/03 1 7327 6776 39 KBG-2LS D\IIY INT 0 09/23/02 ~ ~ ! ~ L :8: , I ~ ~ 9812' 1-1 4-1/2" HES X NIP, 10 = 3.813" 1 9822' l-i 7" X 4-112" BKR S-3 PKR, 10 = 3.875" 1 9845' l-i 4-1/2" HES X NIP, 10= 3.813" 1 9865' 1-1 4-112" HES XN NIP, 10 = 3.725" 1 9878' l-i 4-1/2" T1L WL 83 1 9834' 1-1 8.MO TT LOGGED 11/21/95 10451' 1-1 7" X 4-112" TIW HYDRO PKR, [) = 3.875" 12250' I-iC1BP JUNK LEFT 02/17/02 1 1- FISH - 4-1/2" HALIBURTON CIBP MLL LOOSE - PUSH TO B1M I PBTO H 13272' 14-1/2" LNR, 12.6#, L-80, .0152 bpf, [) =3.958" 1-1 13359' i ~ ~ ) ~ DATE 11/13195 09/26/01 02/17/02 09/22/02 09/23/02 02/21/03 REV BY COM~NTS ORIGINAL COMPLETION RNffP CORRECTIONS JA F/tlh ADD PERFS [)\V/KK GLV CORRECTIONS DTRlKK GL V C/O FW6'KK SEr BKR IBP DATE REV BY COIVMENTS OS/28/03 JCM'TLP RJLL IBP, GL V C/O 06/03/03 KSBlTLH STRAODLEPKR PATŒI 06/27/03 JA F/KK [) CORRECTIONS 09/23/03 CMOITLP ÆRF ANGLE CORRECTION PRU[}iOE BAY UNIf W8..L: G-21 ÆRMT No: 1951540 API No: 50-029-22604-00 SEC 12, T11 N, R13E, 2911' FSL & 2368' ÆL 8P Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: AbanonF'l SuspendC~] Operation Shutdownr"-~ PerforateF1 Variance[-~ Annuar Disposalr-] After Casin.clr-1 Repair Well[] Plu.cl Perforationsr-1 Stimulater..l Time Extensionr..l Otherr-] Change Approved ProgramE~ Pull Tubingr"] Perforate New Pool[~ Re-enter Suspended Well~--~ TUBING PATCH 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. Development [] ExploratoryF"~ 195-154 3. Address: P.O. Box 196612 6. APl Number Anchorage, Ak 99519-6612 Stratigraphic F"I service r"] 50-029-22604-00-00 7. KB Elevation (ft): 9. Well Name and Number: 68.00 G-21 8. Property Designation: 10. Field/Pool(s): ADL 028285 Prudhoe Bay Field ! Prudhoe Bay Oil Pool 11. Present Well Condition Summary: Total Depth measured 13359 feet true vertical 9009 feet Plugs (measured) Effective Depth measured 12250 feet Junk (measured) CIBP Junk Left @ 12250' (02/17/2002). true vertical 8993 feet Casi n g Length Size M D TV D B u rst Col lapse Conductor 107' 20" 140' 140' 40K 520 Surface 3476' 9-5/8" 3509' 3507' 80K 4760 Intermediate 10569' 7" 10602' 9038' 80K 7020 Liner 2918 4-1/2" 10441'-13359' 9032'-9009' 80K 7500 Perforation depth: Measured depth: Open Perfs 11850'-12150', 12580'-13240', Sqzd Perfs 10790'-11075'. Trueverticaldepth: Open Perfs 8995'-8991', 8998'-9006', Sqzd Perfs 9021'-90'~ECE~vE~'~! Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 TBG @ 9822'. 4-1/2" 12.6# L-80 Tubi il '~§878'. 2-7/8" TBG f/1584' to 1589'. 2-7/8" x 3-1/2" XO~.~1~89~i~ 3-1/2" x 2-7/8" XO @ 3089', 2-7/8" @ 3112'. ~,,~ ... Packers & SSSV (type & measured depth) 7"x 4-1/2" Baker S-3 PKR @ 9822'. 7"x 4-1/2" TIW Hydro 15'~:i@' ~i0~51'. 4-1/2" Baker PKR Pacth @ 1584'. 4-1/2" KB STRDL PKR Patch @ 3099'. Patch across the SSSV Landing Nipple @ 2154'. 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Daily Averaqe Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: SHUT-IN Subsequent to operation: SHUT-IN 14. Attachments: 15. Well Class after proposed work: Exploratory~ Development~ Service~ Copies of Logs and Surveys run _ 16. Well Status after proposed work: O, ml GasF1 WAGE] G~NJI--I W~NJI--I WDSPLF1 Daily Report of Well Operations _X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISundry Number or N/A if C.O. Exempt: ........ I N/A Contact DeWayne R. Schnorr Printed Name DeWayne R. Schnorr Title Techical Assistant Signature--~~.~b,~~ ~J~-~.-~ Phone 907/564-5174 Date June 13,2003 Form 10-404 Revised 2/2003 06/01/2003 06/02/2O03 06/03/2003 06/04/2003 06/05/2003 06/05/2003 06/10/2003 06/01/03 06/02/03 O6/O3/O3 06/04/03 O6/05/03 G-21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ANN-COMM (AC-EVAL AND REPAIR): FLUID SWAP PATCH TUBING / LINER: PATCH TUBING / CASING PATCH TUBING / LINER: PATCH TUBING / CASING PATCH TUBING / LINER: PATCH TUBING / CASING PATCH TUBING / LINER: HIT-IA ANN-COMM (AC-EVAL AND REPAIR): AC-MITIA PATCH TUBING / LINER: TUBING TAIL PLUG EVENT SUMMARY T/I/O:[40/40/250] WELL KILLED. PUMPED 50 BBLS CRUDE DOWN IA. RIGGED TO TUBING AND SPEARED IN WITH 5 BBLS METHANOL FOLLOWED BY 30 BBLS FLO-PRO FOLLOWED BY 120 BBLS 2% KCL WATER WITH A 62 BBL DIESEL FREEZE PROTECT. FINAL WHP's = 0/0/250. CTU #5, EXTENDED TUBING PATCH. MIRU, PREFORM BOP TESTS ON 3.5" & 1.75" BOP's. CTU#5, EXTENDED TUBING PATCH. RIH WITH BAKER 4.5" PACKER WITH TAILPIPE ASSEMBLE, 2-7/8" XN NIPPLE WITH PXN PLUG INSTALLED. LOCATE SSSV NIPPLE WITH BAKERS NIPPLE LOCATOR @ 2128' CTMD. CORRECT NIPPLE LOCATOR TO 2154' (1 JOINT OF TUBING MISSING FROM ORIGINAL TALLY REFER TO ELMD TO MD OF TT). RIH 934' AND SET SEALS IN THE MIDDLE OF THE 23rd JOINT @ 3114'. SET PACKER AND CMIT TO 2000 PSI. GOOD TEST LOST 71 PSI IN 30 MINUTES. POOH AND BREAK OFF LUB. SET INJECTOR ON BACK DECK AND RIG UP CASING CREW. RUN STINGER, 51 JOINTS OF 3.5" 9.3# L-80 TUBING PLUS ONE 10' PUP AND TOP STRADDLE PACKER. TAGGED UP AT 3061' NOT ABLE TO PRESSURE UP DOWN COIL, EITHER NOT STINGING INTO BOTTOM PACKER OR THERE IS A PROBLEM IN THE ASSEMBLY SOME WHERE. POOH. MADE TWO ATTEMPTS TO STAB INTO PATCH ASSEMBLY WITH OUT THE TOP PACKER OR SETTING TOOL, (OAL = 1502'). (BAKER TAKING TOP PACKER TO SHOP TO CHECK OUT). ABLE TO STAB INTO BOTTOM PACKER ON SECOND ATTEMPT. REINSTALL THE TOP PACKER TO THE BHA. MADE 3 ATTEMPTS TO STING IN ROTATING IT TO DIFFERENT POSITION ON SURFACE EACH TIME. POOH. INSTALL LOCKING SWIVEL. RIH. SET UPPER PATCH ASSY AND BAKER 4-1/2" KB PACKER (1513.26' OAL) WITH TOP @ 1584.14' MD. CT x T ANNULUS TESTED GOOD TO 500 PSI. NEW MINIMUM ID FOR WELL IS 2.205" (XN NIPPLE @ 3110' MD). NOTE: 2-7/8" PXN PLUG INSTALLED IN PATCH. WEL TO REMAIN SHUT-IN. MIT IA TO 3000 PSI/BPV IN HOLE/DID NOT DO JOB. Page 1 G-21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 06/O5/O3 T/I/O=50/100/300. MIT IA PASSED TO 3000 PSI. (POST TBG PATCH). IA LOST 170 PSI IN 30 MINUTES. T/I/O = 50/500/280. 06/10/O3 WELL S/I UPON ARRIVAL. PULL PX PRONG FROM 3050' WLM. PULL 2.31" PLUG BODY FROM 3050'WLM. WELL READY TO POP. NOTIFY DSO OF WELL STATUS FLUIDS PUMPED BBLS 5 NEAT METHANOL 154 50/50 METHANOL 62 DIESEL 53 CRUDE 120 2% KCL WATER 30 FLO-PRO 424 TOTAL Page 2 i TREE = 4" CA IVERON SAFETY NOTE: GLM S: (CAMCO WIDK-1 BOTTOM WB_LHEAD = CIW G 21 LATCH) TO SET 1" BTM LATCH GLVS IN THE "OLD ACTUATOR = BAKER STYLE" KBG-2LS GLM, THE RUNNING HEAD NO-GO KB. ELEV = 70.05' NEEDS TO BE MOVED UP 1/2". GLM ID IS 3.833", BF. F-LEV = 38.4' KOP = 4529' ** HO RIZONTAL WELL** Max an~lle = 96 ~ 10683' -...._ 9975, Datum MD= Datum TVD = 8800' SS I '" 2154' - 4-1/2"SSSV FESHXO LANDI~IP, ID=3.813" J I ~'lr2"TBG'9'3~'L'B0''D:2'3~0"H 3089' i 3089' - 3-1/2"X2-TiS"XO.,D:2.992"I g .g~ ~ 3091' - 4-1/2"TIEBACKSLVw/LOCATOR, ID=2.380" j J J ~ ~ 3099' - 4-1/2" KB STRDL PKR PATCH, D = 2.38" (06/03/03) I ~-.,~"T~.?.~.~,~=~.~, H 311o'I ~~' 3.o.-~-.,~,..owoox...,,o=~.~o~,,(o~o~)I ~ 3112" - WLEG, ID = 2.400" (06/03/03) J J 9-5/8" CSG, 40~, NT-80,lD=8.83~" J-j3509' J~ GAS LIFT MANDRILS L ST MD TVD DEV TYPE VLV LATCH PORT DATE ' "'"n;mum, v,,~ ID = 2.205" ~'=' 3110' 2 4254 4170 0 KBG-2LS DMY INT 0 05/27/03 1 7327 6776 39 KBG-2LS DMY INT 0 09/23/02 2-7/8" HOWCO XN NIPPLE I i II 9812'H 4-1/2"HESXNIP, ID:3.813"J I X :X: I 9822' H 7"X4-1/2"BKRS-3FKR, ID=3.875"J I TOP OF 7" CSG H 9838' I I J i 9845'I-t ~-~a" ~s x .... ,~=3.813" I ' 9865' H 4-1/2"HESXNNIP'ID=3'725"I I I i I i I 14.1/2,'TBG'12.~'L'8°''°152bpf''D=3.9§8.' I-t9878' I i 9878' H .-~',~.w..~ I I 9834' HELMD'rT LOGGED11/21/95I IT°P°F4'u2''LNR Id ~044~. ' L J . ~04~. Id .,,x4-~,~,,.,w.~o~,~:~.o.~,, I X j)<: I I ~'' os~, ~#,,-~o, .~: ~.~,, I-I ~o6o2' ~ · PERFORATION SUMMARY 12250' HCIBPJUNKLEFT 02/17/02 I REF LOG: SPEF~,Y SUN MWD ON 10/95 ANGLEATTOP PERF: 91° @ 11850' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPN/SQZ DATE 2-3/4" 4 10790 - 11075 S 10/16/99 2-1/2" 4 11850- 12150 O 02/17/02 ~~ IMLL LOOSE-PUSHTO BTM 3-3/8" 6 12580 - 13240 O 02/13/96 i I I~- ~/~, LNR, 12.6#, L-80, .0152 bpf, D = 3.958" J--J 13~';' J DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/13/95 ORIGINAL COMPLETION 02121103 PWE/KK SETBKR IBP WILL: G-21 03/02/01 SIS-MD FNAL 05/28/03 JCM/TLP FULL IBP, GLV CIO PERIVITNo: 1951540 09126101 RN/TP CORRECTIONS 06/03/03 I KSB/TLH STRADDLEPKR PATCH APINo: 50-029-22604-00 02/17/02 JAF/tlh ADDPERFS SEC 12, T11N, R13E, 2911'FSL& 2368' FEL 09/22/02 DAV/KK GLV CORRECTIONS J09/23/02 DTR/KK GLV CIO BP Exploration (Alaska) I PERFORATION SUMMARY REF LOG: SPERRY SUN MWD ON 10/95 ANGLEATTOP PERF: 91° @ 11850' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPN/SQZ DATE 2-3/4" 4 10790 - 11075 S 10/16~99 2-1/2" 4 11850- 12150 O 02/17/02 3-3/8" 6 12580- 13240 O 02/13/96 DATE REV BY COMMENTS DATE REV BY COMMENTS 11/13/95 ORIGINAL COMPLETION 02/21/03 PWE/KK SETBKR IBP 03/02/01 SIS-MD FNAL 05/28/03 JCM/TLP FULL IBP, GLV C/O 09/26/01 RN/TP CORRECTIONS 06/03/03 !KSB/TLH STRADDLEPKP, PATCH 02/17/02 JAF/tlh ADDPERFS 09/22/02 DAV/KK GLV CORRECTIONS 09/23/02 DTR/KK GLV C/O STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X Add Perfs Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 2368' FNL, 2368' FEL, Sec. 12, T11N, R13E, UM At top of productive interval 484' FNL, 4427' FEL, Sec. 13, T11N, R13E, UM At effective depth 885' FNL, 2316' FEL, Sec. 14, T11N, R13E, UM At total depth 908' FNL, 2407'.FEL, Sec. 14, T11N, R13E, UM 5. Type of Well: Development __X Exploratory__ Stratigraphic__ Service__ (asp's 657854, 5969272) (asp's 655868, 5965835) (asp's 652709, 5965368) (asp's 652616, 5965342) 12. Present well condition summary Total depth: measured true vertical 13359 feet Plugs (measured) 9009 feet 6. Datum elevation (DF or KB feet) RKB 68 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-21 9. Permit number / approval number 195-154 10. APl number 50-029-22604 11. Field / Pool ' Prudhoe Bay Oil Pool Effective depth: measured 13263 feet true vertical 9006 feet Junk (measured) CIBP Fish @ 13263' (10/20/1999) Casing Length Conductor 107' Surface 3476' Intermediate 9805' Intermediate 864' Liner 2918' Size Cemented Measured Depth 20" 260 sx AS (Approx) 140' 9-5/8" 990 sx CS III, 305 sx 'G', 3509' 310 sx CS II 7" 9838' 7" 330 sx Class 'G' 9838' - 10602' 4-1/2" 305 sx Class 'G' 10441' - 13359' True Vertical Depth 140' 3507' 8766' 8766'-9038' 9032'-9009' Perforation depth: measured Open Perfs 10790'- 11075', 11850'- 12150', 12700'- 13240' true vertical Open Perfs 9021'- 9017', 8995'- 8991', 9001'- 9006' rubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 TBG @ 9822'. 4-1/2", 12.6# L-80 Tubing Tail @ 9878'. Packers & SSSV (type & measured depth) 7" x 4-1/2" Baker S-3 Packer @ 9822'. 7" x 4-1/2" TIW Hydro Packelr..,..:@.~.1,. 0~51....'. ~.....'.' ~, ~ ...,, 4-1/2" HES HXO Landing Nipple @ 2154'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or I niection Dat~. Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure "~ Tubing Pressure Prior to well operation 01/19/2002 673 17185 14 664 Subsequent to operation 02/25/2002 1984 15808 91 757 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations _ 16. Status of well classification as: Oil _X Gas _ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~-~~~j~ Title: Techical Assistant DeWayne R. Schnorr Date February 26, 2002 Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE'~ G-21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 11/30/2001 02/15/2OO2 02/16/2002 02/17/2OO2 PERF(ADD-PERF): DRIFT W/2 7/8" DMY GUN PERF(ADD-PERF): PER. FOR~T]:NG PERF(ADD-PERF): PER. FORAT:ING PER. F(ADD-PERF): PERFORATING EVENT SUMMARY 11/30/01 DRIFTED TO 10,190' W/2 7/8" X 11' DUMMY GUN, TOOLS STOPPED DUE TO DEVIATION RETURNED WELL TO PAD OP. & PCC *** UPCOMING CT ADD PERFS *** 02/15/02 PERFORM BOP TEST. RIH W/3" JSN FOR DRIFT RUN AND TO LAY VISCOUS FLUID. DRIFT TO 13,000'. NO OBSTRUCTIONS. PUMP 25 BBL SWEEP OF FLO- PRO TO CLEAN PERF INTERVAL, PUMP BOTTOMS UP. LOAD AND KILL WELL ~TBG AND IA) W/270 BBLS FILTERED 2% KCL---TBG, AND 130 BBLS CRUDE--- IA. LAY IN FLO-PRO ACROSS PERFS. POOH, NO FLO WELL. MU AND RIH W/ 300' 2-7/8" HSD PJ GUNS, 4 SPF, 60 DEGREE PHASING. UNABLE TO GET PAST 11900' CTMD W/GUNS. PULLING CLEAN BUT BRINGING OBSTRUCTION UP HOLE AFTER EVERY PU. POOH. 02/16/02 BO 2-7/8" LIVE GUNS AFTER FAILED ATTEMPT TO GET TO DESIRED SHOOTING INTERVAL. RIH W/3-1/8" VENTURI J/B. SWEEP ACROSS 4-1/2" LINER INTERVAL FROM 11,300' - 12,200'. RECOVER 1/2 CUP OF CIBP PIECES. RE-RUN 300' OF 2-7/8" PERF GUNS. SET DOWN @ 11,540' LOST GROUND, STACK OUT AT 11,010'. PU VENTURI J/B ONCE AGAIN. 02/17/02 RIH FOR VENTURI J/B RUN. UNABLE TO GET INTO LINER. POOH, ADD WT BARS TO BHA. RIH W/VENTURI J/B AND PASS INTO LINER AFTER SEVERAL ATTEMPTS. MAKE VENTURI RUN FROM 11,000' - 12,365'. SET DOWN ON SUSPECTED LARGE PIECE(S) OF DEBRIS FROM MILLED CIBP NUMEROUS TIMES FROM 12,100' - 12,365'. MAKE 2 ADDITIONAL VENTURI RUNS FROM 11,000' - 12,250'. NO SET DOWNS OR OVERPULLS THROUGH THIS INTERVAL. RECOVER MINIMAL METAL FILINGS IN J/B >>> SUSPECTED CIBP DEBRIS LEFT AT OR BELOW 12,250' <<< SHOOT 300' >>> 11,850' - 12,150' <<< OF 2- 1/2" PERF GUNS (4 SPF). POOH. ALL SHOTS FIRED. WELL FREEZE PROTECTED AND LEFT SHUT-IN. NOTIFY WS TO RU PBGL. RDMO. NOTIFY PAD OP. <<<< JOB COMPLETED >>>> FLUIDS PUMPED BBLS 875 60/40 METHANOL WATER 450 2% KCL WATER 200 1% KCL SLICK WATER 500 1% KCL EXTRA SLICK WATER 75 FLO PRO Page 1 G-21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 130 ICRUDE 2230 ITOTAL ADD PERFS 02/17/2OO2 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2-7/8" PJ 4SPF, 60 DEG PHASING, RANDOM ORIENTATION. 11850' - 12150' Page 2 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner THRU: Tom Maunder, P. I. Supervisor FROM: Chuck Scheve; SUBJECT: Petroleum Inspector DATE: April 24, 2001 Safety Valve Tests Prudhoe Bay Unit G Pad Tuesday, April 24, 200,1: I traveled to BPXs G Pad and witnessed the one-month retest of the safety valve systems. As the attached AOGCC Safety Valve System Test Report indicates I witnessed the testing of 16 wells and 32 components with no failures. The surface safety valve, on well G-03A closed rather slowly but passed its pressure test. The wing valve on wells G-16 and G-18A had very slow leaks but did ~notprohibit a valid test of the surface: safety valve:.::Well G-21:: wh.ich.?failed ~the pre~:ieus months ~test.~,d,uelo:~a frozen pilot :has the new style insulation box in place and functioned properly. Merv Liddelow performed the testing todaY; he demonstrated good test procedures and was a pleasure to work with. A walk through inspection: of the Well:houses on this pad was performed during the SVS testing.with~ noproblems noted. Well G-14A which was:sh'ut inat this time and not tested~was found to have the new style insulation box on the pilot. This should fix the :Problems found on previous tests. Summary: I witnessed the one-month retest of the safety valve systems at BPXs G-Pad. ~PBU G~'Pad, 16 wells,. 32 components, 0 failures 22 wellhouse inspections Attachment: SVS PBU G Pad 4-24-01 CS X Unclassified Confidential (Unclassified if doc. removed ) Confidential SVS PBU G Pad 4-24-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Field/Unit/Pad: Prudhoe / PBU / G Pad Separator psi: LPS 174 Date: 4/24/01 HPS 720 Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI TAp Code Code Code Passed GAS or CYCLE G-01A 1931710 720 5501 530 P P P OIL G-02A 1950230 G-03A 1970700 174 125 100 P P P OIL G-04A 1951630 G-05 1780970 720 550 525 P P P OIL G-06 1790120 G-07 1790180 174 125 110 P P P OIL G-08 1810480 G-09A 1982630 G-10A 1950390 G-11A 1931600 720i 550 540: P P P OIL G-12A 1961050 G-13 1810720 174 125 125 P P P OIL: G-14A 1980530 G-15A 1981340 720 550 500 P P P OIL G-16 1811220 720 550 500 P P P OIL G-17 1810940 G-18A 1990320 720 550 550 P P P OIL G-19A 1991030 720 550 530 P P P OIL G.21 ' - 1951540 720 550 500 P P P OIL G-23A 1960200 720 550 510 P P P OIL G-24 1861830 G-25 1861620 720 550i 510 P P P OIL G-26A 1981510 720 550 500 P P P OIL G-27 1861560 720 550 525 P P P OIL G-29 1861600 G-30A 1950760 G-31A 1980540 720 550 525 P P P OIL G-32A 1970010 ~ 90 Day RJF 1/16/01 Page 1 of 2 SVS PBU GPad 4-24-01 CS Well Number Wells: Permit Number 16 Separ Set PSI PSI Components: L/P Trip Code Passed 32 Failures: 0 Failure Rate: Oil, WAG, GIN J, GAS or CYCLE 0.00% C~ 90 Day Remarks: Good Test. Surface Safety Valve on Well G-03A closed slowly but passed its pressur test. The wing valve on wells G-16 and G-18A had very slow internal leaks and will repaired by the operator. RJF 1/16/01 Page 2 of 2 SVS PBU G Pad 4-24-01 CS MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, ¥,~x DATE: Commissioner ~~ lorn Maunder, P. I. Supervisor o'A[o~,-(3\ THRU: March 26, 2001 FROM: Jeff Jones, SUBJECT: Petroleum Inspector 'Safety Valve Tests Prudhoe Bay Unit BPX/G Pad March ,,2.6., 2001; I traveled to BPX's Prudhoe Bay Field, G Pad, to witness Surface Safety Valve System tests and perform well house inspections. Merv Liddelow was the BPX representative in charge of testing and he performed the tests in a safe and proficient manner. Fifteen wells were tested with:nine failures witnessed. The pilots on wells G-02A, G-1 lA, 'G-14A and G- 21A failed to operate properly. The SSV's on wells G-01A, G-02A, G-03A, G-09 and G-13 failed to close or failed to hold D/P. Wells G-03 and G-09 were shut in pending repairs. Mr. Liddelow indicated to me that all other failures had been repaired and passed a retest within 24 hours. Fifteen well houses were inspected and slight crude oil leaks were noted on wells G-14 and G-16. Mr. Liddelow and his crew repaired these leaks immediately. The AOGCC test reports are attached for reference. SUMMARY.:. I witnessed SVS tests on 15 oil producing wells on BPX's G Pad in the Prudhoe Bay Field. 15 wells, 30 components tested. 9 failures: 30% failure rate. 15 well house inspections Attachments: SVS.PBU G Pad 3-26,01 JJ NO.N~.qONF!DENT!A,,,L SVS PBU G Pad 3-26-01 JJ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/G-Pad Separator psi: LPS 152 Date: 3/26/01 HPS 649 : ' ' "' '' '' ' i . '1 ' ' ..... ' ' ' ' ' ' ii " ': ' ' "' ' '~ '' ' .... "' Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GII~IJ, Number Number PSI , PS!, , Trip Code Code, ,.Code,. P..assed,. ,GaS or CYCLE G'01A 1931710 6~9 550 565 P 5 oIL :G-02A 1950230 152 125 145 1 5 OILI G-03A ' 1970700 ' '152 'i25 115 P 5 " oILI G-04A 1951630 G-05 1780970 649 550 555 'P ' "P ........... 0I~ G-06 1790120 G-07 ' 1790180 152: '125 ' 115 P .......P .......... 0iL G-08 1810480 G-09A .... i982~i30 ' 649' 550' " 5601 P '4 ............ OiL G'-i0A 1950390 ' ............................... G-11A ...... i931'i 00 "' 649 550 "'180 " '3 ' P 0IL G-12A '1961050 .......... ' ' ' ~' ~G-13 '1810720 '152 '125: 120 ' P .......~ .... ..... OI~ G-14A ' "i980'53'0 ....649 ~50 .... 0' "2" P .............. oIL G-15A" ' 1981'~0' " 649 ' "55'0 ' 5'36 "P p' ' ' - OIL G:i6 ........... 18'11~20'~ '' 649 "' 550 " '540 ' P P ......... G- 17 1810940 G~!SA', ' 1990.3..20 i. 649 ' ~50 ".'.5.55 ' ....P .. . ~ ............ . . OIL G-19A 1991030 ' ~' W~'~.':-;~ ,: ~,,~h4~ ' ~ ......... ,, ' . ' ..... , .... , ~?.i~,~ ~51540 649:'" 5'50 2 P .0IL G-23A 1960200 G-24 1861830 G-25' 1861620 ........................ G,26A 1981510 .I G.27 '"1'861'560 ...... ~G-29 1861600 G-30A 1950760 G-31A "1980540' 64~' 55'0 560 ' r' P ............ OiL G-32A 1970010 '' '152 125i ' '146"' e ' 'P .............. oIL' Wells: 15 Components: 30 Failures: 9 Failure Rate: 30.00%1~]90 Day Remarks: G-3, G-9 are shut in for repair. ,Operator reports all other failures repaired & p~.s. edr.? RJF 1/16/01 Page 1 of 2 SVS PBU G Pad 3-26-01 JJ1 Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed GAS or RJF 1/16/01 Page 2 of 2 SVS PBU G Pad 3-26-01 JJ1 = ea red rvices rilling 900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508 (907) 561-5111 Fax: (907) 564-5193 December 14, 1998 Wendy Mahan Natural Resource Manager Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501-3192 RECEIVED Re: Annular Disposal Information Request Dear Ms. Mahan: DEC 141998 Alaska 0il & Gas Cons. Commission Anchorage On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular DispoSal Records from July 25, 1995 through preSent time. We compared your list with Our records and are able to provide you with the following data: · Individual Annular Disposal Logs from the ssD database which coincide with the approved wells on your attached AOGCC Annular Log. The.SSD records are proVided to you in the same order as listed on your log. · There were some wells on your list which were not injected into. These wells are identified as follows: · Endicott wells 1~03/P-16, 1,65/N-25, 1-59/0-24 · EXploration well Pete's Wicked #1 · Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 & #2, K-05, K-02, H-07, K-25, K-37, E-17, F-21, K-30, K-34, K,21i, F-66, K-06, K-54, K-33, F,49i, K-18 · PBU Wells E-38, 18-34, 15-42, $-29A, 15-46, B-36, 15-43, 11-38 · The reason many of these annuli were not used is because the waste materials generated from these wells were injected into other approved annuli. Hopefully the injection logs submitted with this letter will clarify this. In addition, please note that our records show: · The wells listed above in italics were permitted but not used for annular disposal. · The wells listed above in BOLD were not permitted for annular disposal. Wells drilled after June 6, 1996 were required by SSD procedure to be permitted with a Sundry Approval (10-403) form. Our records show that no Sundry Approval for Annular Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996 were automatically approved for annular disposal with the Permit to Drill. · We also provide you with a cumulative report from our database of records from July 25, 1995 through the present. FrOm those records, we show the following wells not listed on your report were used for annular dispOsal: L. {' ,, .Annular Disposal Letter .'. 12/14/98 ! · Endicott wells 1-23/O-15, 1-61/Q-20, 2-40/S-22 · Exploration well Sourdoueh #3 - ~' * o ~ , . · Milne Point wells F-06, ~05, ~-06, J-13, L-24 - ~s-~7~' PBUwells 18-30, 18-31, 14~,~-43, E-34, E-36, G-~A,~dS-33-~'~z Individu~ logs ~e provided to ~ou'.~' OSfo~ ~ these'S~' ~ogs' q fist' O~we~l · Finally, our records show that the B-24 outer annulus was left open (see attached correspondence) Thank you for the opportunity to provide clarity to these records. If I can be of any further assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental Advisor at 564-4305. Sincerely, Fritz P. Gunkel Shared Service Drilling Manager FPG/KMT cc: Dave Wallace - HSE Manager (w/out attachments) NOV 1 200l RECEIVED !4, 1998 Alaska 0il & Gas Cons. C0mmissio~ Anchorage )NNULAR INJECTION ATA ENTRY SCREEN Asset .~.O~ .......................................... Rig Name ~J.~ll~9.r.~..2~F,,...; ......................... Inj Well Name .~:.:~.1 ............................................ Sur Csg Dep :~.5.Q.~. ................ Legal Desc 2.9.:LI.'.blcJi,.2.3.§~.'.YV..EL,..c~.e,c~..I?,,,IJ..I.H,.EL1.4E .................................. Research Permit Start ......... .~../~J.~l.5. ......... Permit End ........1.~.:~.1/.~.~. ....... Cumulative Data *Permit Expires in 30 Days or Less* · Ri' cOmpletion Fotmati0n: :' : Intermittant : Final ~ : !~.. g~ ::i:: :_ ~ ..... : ~: ~: :: ::::::::::::::::::::::::::: :: ::::::::::::::::::::::::: : : : : ::. i ::WeijTotai::: ::~: /Ct : W~:~ :: :':: : Fidid~ .... :::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::: Freeze · Mud~..:~ g:. :~:~::::::: :: :::u:::::::::::::::::: ::::: ::::::q:::: : :::%: .:.~-::~::: :}.:~: ::::u::d ::::::: f:: ::: :: :::::: :::/:::::::::::::: ::::::::::::?4: :.'. ::: :: :::; :: :: :~.:: .... .:: L)EC "-": Daily Data ~ Dated .~ J C(x.i. plel~ ~ Free~ Free~ Daly Anr,Jus G-21 J 10/23/95 550 550 G-21 110/24/95 ! 90 90 ~-2~ ~10/2s/95 1296/ _ 296 G-2~ ~0/30/~5 i 120 J I ~20 ............................................................................................................................................................... ~-21 ~11/05/95 ]308 - ~ 308 .................................................................................................................................................... G-21 11/06/95 ~ 75 175 ........... G-21 - 1 i/07/9~ ~135-- 135 G-21 11/08/95 50 50 100 G-21 ~11/11/95 j f30 I 30 G-04A ~'1~-~/~ ........... ~ ............................... ~ ............... ~ ................ ~ .................. 70 ................. 145 ........................................................................................................................ J G-04A 153 11/21/95 G-04A 11/23/95 160 ~177 G-04A 11/24/95 '~ 10 'G-04A 11/25/95 135 G-04A 11/26/95 90 11/27/95 11/28/95 199 2/O4/95 I G-04A G-04A 150 150 200 1,288 G-04A 11/29/95 75 G-04A 11/30/95 15 78 G-04A ~ 12/01/95 i 90 G-04A 659 62 153 337 110 135 90 150 549 1,363 93 90 721 I. Sharrd SerVice Eh'illing Annl:/Tar Injection Volumes July 25, 199.5 until December 1998 Cumulative Report Rig Inj Well Endicott Doyon 15 1-19/I-18 Doyon 15 1-23/O-15 Doyon 15 1-33/M-23 Surface Casing Deplh 50O0 4246 5013 Legal Desc Cum Mud Cum Rig Cum Total & Ctgs Wash Sec. 36. T12N. R16E 8.960 7.848 2020'FNL. 2087'FEW. SEC.36.T12N.R16E 32.084 30.604 3217'NSL. 2114'WEL. Sec 36.T12N. R16E 9.879 9.729 Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus Fluids Fluids Freeze Freeze Start End Slalus 992 1.160 150 .120 12/5/95 12/5/96 Open 200 .120 9/30/95 12/31/95 Open 8/31/95 12/31/95 Broached Doyon 15 1-61/Q-20 4236 3075'NSL. 2207'WEL. Sec 13.T12N. R16E 25.228 21.379 . _ . Doyon 15 2-40/S-22 4531 2020'FNL..2289'FEL. Sec 36.T12N. R16E 31.195 29.952 soA 2_'6--13_ 1,063 1,17~ ........................ 6_0 _12/5!95 . . 12J5_/96 ...... Ope? .... 120 60 7/25/95 12/31/95 Open Doyon 14 15-47 3515 3648'NSL, 4956'WEL, Sec 22,T11N, R14E 3,002 903 2,009 90 11/7/95 12/31/95 Open ~)oyon 14 DS 15-45 3829 4749' NSL, 5180' WEE Sec. 22, TllN, 1,882 1,697 134 51 4/4/96 4/4/97 Broached ~)oyon 14 DS 15-48 3548 Secl 22, T11N, R14E 3,385 216 820 2,283 66 12/21/95 12./21/96 Open ~)oyon 14 DS 15-49 3667 4676' NSL, 5165' WEL, Sec. 22, T11N, 4,669 1,559 1,141 1,904 65 2/21/96 2/21/97 Open :)oyon 9 18-30 3930 1499'SNL. 26'WEL. Sec 24.T11 N. R 14E 2.266 936 380 800 150 7/25/95 12/31/95 Open )oyon 9 18-31 3680 3719'NSL. 64'WEL. Sec 24.T11N. R14E 6.086 2.250 1.100 2.565 171 7/26/95 12/31/95 Open )oyon 9 18-32 3830 3632'NSL. 41'WEL. Sec 24.T11N. R14E 3.311 1.861 200 1.100 150 8/24/95 12/31/95 Open )oyon 9 18-33 ' 4140 3690'NSL. 56'WEL. Sec 24.T11N. R14E 5.215 2.050 3.035 10 120 9/28/95 12/31/95 Open labors 18E 12-35 · 3543 348'NSL. 705'WEL. Sec 18.T10N. R14E 3.723 3.436 137 150 9/1/95 12/31/95 Open labors 18E 12-36 3452 63'FSL. 899'FEL. Sec 18.T10N. R15E 4.002 1.961 50 1.871 120 10/13/95 12/31/95 Open labors 18E 13-36 3431 1585'NSL. 5187~/VEL. Sec 13.T10N. R14E 4.137 3.523 464 150 10/26/95 12/31/95 Open labors 18E 14-44 3288 2829'NSL. 1617'WEL. Sec 9.T10N. R14E 3.974 2.3i9 1.535 120 8/17/95 12/31/95 Open xploration ool 4 Sourdough #3 4236 2245'FSL. 5067' FEL. Sec. 29. T9N. R24E 5.786 4.630 1.156 1/26/96 1/26/97 Closed lilne 27E MPK-17 3508 3648'NSL.2100'WEL. Sec.03.T12NR11E 19.608 18.538 285 685 100 4/18/96 4/18/97 Open abors 22E MPc-23 4941 1038 NSL. 2404 WEL. Sec 10.T13N. 2.060 1.800 130 130 1/25/96 1/25/97 Open abors 22E MPC-25 8595 1143'FNL. 2436'FWL. Sec 10.T13N. R10E 1.905 1.465 300 140 1/5/96 1/5/97 Open abors 22E MPC-26 4704 1086 NSL. 2419 WEL. Sec 10.T13N. 5.228 4.483 555 190 12/19/95 12/19/96 Open abors 22E. MPC-28 5405 sec 10.T13N. Ri0E 425 350 75 2/15/96 2/15/97 Open Page I DE ; 4. 1998 Shared Service Drilling Annul'ar Injection Volumes July 25, 199,~ until December 1998 Cumulative Report Rig Inj Well Nabors 22E MPF-06 Nabors 22E MPF-14 . .. Nabors 22E MPF-70 Nabors 22E MPH-05 Surface Casing Depth 8766 6690 7919 5335 Cum Mud Cum Rig CumCompl Cum Form Cum Interm Cum Final Legal Desc Cum Total & Ctgs Wash Fluids Fluids Freeze... Freeze 196 Sec 06,T13N, R10E 1,927 ~,7_3_1 . _ . . Sec'06.T13N, R10E UM 18,717 17,107 1,270 340 6/3/96 . . 2189'NSL 2591'WEL, Sec 6,T13N, R10E 19,775 18,794 735 190 .56 6/17/96 ...... ... ..... 2882'NSL 4028'WEL, Sec 34,T13N, R10E 8,283 7,711 382 190 8/19/95 Disposal Period Start End 1/25/96 1/25/97 6/3/97 6/17/97 12/31/95 Annulus Status Open .. Open Open Open Nabors 22E Nab0rs 22E Nab0rs 22E Nabors 22E Nabors 27E MPH-06 MPI-07 _ MPJ-13 MPJ-16 B-24 7304 2824'NSL 4044'WEL, Sec 34,T13N, R10E 8.515 8,335 2680 2339'NSL 3906'WEL, Sec 33,T13N_,_R1~0_E .... !.,_668_0_ _ 1.2_80 . _ 2835 2319'NSL 3179'WEL, Sec 28,T13N, R10E 14,127 13,292 3112 4080 2317'NSL 3336'WEL, Sec 28,T13N, R10E Sec 18,T13N, R11E UM 985 915 1,468 1,396 250 645 72 180 8/5/95 12/31/95 Open 80 70 9/21/95 12/31/95 Open 60 130 10/17/95 12/31/95 Open 70 11/12/95 12/31/95 Open 1/25/96 1/25/97 Open Nabors 27E MPF-22 8841 Sec 06.T13N, R10E UM 6,536 6,466 70 ..... Nabors 27E MPF-25 3405 1857'NSL, 2696'WEL, sec 6,T13N, R10E ' 9,897 9,357 250 225 65 12/26/95 12/26/96 Open Nabors 27E MPF-37 6621 1931'NSL, 2643~NEL, Sec 6,T13N, R10E 7,032 6,887 70 75 7/25/95 12/31/95 Open Nabors 27E MPF-38 8561 1994'NSL, 2731'WEL, Sec 6,T13N, R10E 9,232 9,157 75 12/6/95 12/31/95 Open Nabors 27E MPF-45 6678 1979'NSL, 2608'WEL, Sec 6,T13N, R10E 17,562 17,381 181 7/31/95 12/31/95 Open Nabors 27E MPF-53 6750 2028'NSL, 2572'WEL. Sec 6,T13N, R10E 6,051 5,671 165 75 60 80 8/19/95 12/31/95 Open 75 8/31/95 12/12/95 12/12/96 .. _ 12/31/95 Open Nabors 27E MPF-61 6585 2077'NSL 526'WEL; Sec 31,T14N, R10E 5,732 5,657 Nabors 27E MPF-62 6059 2141'NSL 2627'WEL, Sec 6,T13N, R10E 386 316 70 10/13/95 12/31/95 Ope~nn Nabors 27E MPF-69 5772 2125'NSL 2502'WEL, Sec 6,T13N, R10E 9,740 91665 75 8/31/95 12/31/95 Open Nabors 27E MPF-78 7085 2237'NSL 2555~/VEL, Sec 6,T13N, R10E 8,476 7,456 40 775 65 140 9/12/95 12/31/95 Open Nabors 27E MPL-24 6515 3654'NSL 5180'WEL, Sec 8,T13N, R10E 6,790 4,900 1,320 165 335 70 11/27/95 12/31/95 Open WOA 18E F-33 3570 3332'NSL, 2174'WEL, Sec 2,T11N, R13E 1,468 183 660 465 160 2/21/96 2/21/97 Open 18E F-36 3691 2642'NSL, 2878'WEL, Sec 2,T11N, R13E 6,963 1,998 1,359 3,471 135 12/18/95 12/18/96 Open -. 140 1/31/96 1/31/97 Open ~)oyon 9 D-30 3456' 3625' NSL, 1066' WEL, SEC. 23, T11N, 5,261 2,811 1,275 1,035 ~)oyon 9 D-31 3215 SEC. 26, T11N, R13E 150 150 4/20/96. 4/10/97 Open ;)oyon 9 D-33 3222 2965' NSL, 1067' wEL, SEC. 23; TllN, 4,661 2,425 2,106 130 2/21/96 2/21/97 Open ~labors 18E S-43 3121' 4211 'NSL;4503'WEL,SEC35,T12N,R12E 5,943 2,636 1,716 1,511 80 5/7/97 5/'7/98 OPEN Page 2 - SGANNi D NOV Shared, ~ei~vice D[illing AnnUlar InjeCtion Volumes July 25, 1995.. until December 1998 Cumulative Report Sudace Casing Rig Inj Well Depth Nabors 28E B-33 3504' . . Nabors 28E E-34 3664 Nabors 28E E-36 3648 Nabors 28E E-37 3810 Cum Mud Legal Desc .. CUm To. ta! & Ctgs 969'SNL, 1898'EWL, Sec 31, T11N, R14E 3,974 2,842 168~S_N__L, 50_01W~EL, Sec 6, T I!N, R14E .... 9,__65~6~ ....... 7:.2_2._8 1706'SNL, 822'WEL, Sec 6;T11N, R14E 9,271 4,417 .. _. _ 3391'NSL, 881'WEL, Sec 6,T11N, R14E 4,695 4,241 Cum Rig Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus Wash Fluids Fluids Freeze Freeze Slart End Slalus 857 195 80 5/1/96 12/31/96 Broached 1,420 858 40 110 8/23/95 ._. 12/31/95 Open 1,293 3,096 365, .... 100 7/25/95 12/3!/95 Open 374 80 9/16/95 12/31/95 Open Nabors 28E E-39 3638 3358'NSL, 501'WEL, Sec 6.T11N, R14E 2,250 Nabors 28E G-04A 3509 2917'NSL, 1974'WEL, Sec 12,T11N, R13E 5,937 Nabors 28E G-21 3509 2911'NSL, 2368'WEL, Sec 12,T11N, R14E 11,430 Nabors 2~E __ _ ~.-2.4__ ............. _2_75_0 ....... 1633'SNL, 4228'WEL, Sec 35,T12N, R12E 20,261 Nabors 28E S-33 2958 1639'SNL, 1487'WEL, Sec 35,T12N, R12E 18,014 928 220 1,022 1,798 1,824 2,315 3,956 3,072 4,270 i 1,773 6,613 2,177 5,751 2,431 8,392 80 8/28/95 1 2/31/95 Open ...... 10/20/95 12/31/95 Open . 70 62 9/8/95 12/31/95 Open 275 285 12/9/95 12/9/96 Open 270 308 12/1/95 12/1/96 Open 8,062 Nabors 28E S-41 3331 4152' NSL, 4504' WEL, Sec 35,T12N, 4,159 2,034 1,754 ___!.~1~ ....2/8/96 ..... 2/8/97 Open Nabors 28E S-42 3077 Sec 35, T12N, R12E 168 100 68 3/13/96 3/13/97 Open Nabors 2ES H-35 3157 4535'NSL, 1266'WEL, sec 21 ,T11N, R13E 4,860 3,725 555 480 20 80 10/26/95 12/31/95 Open ' Nabors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21,T11N, R13E 1,452 857 100 410 85 10/26/9_5 _12!31/95 Open Page 3 Al h sred rilijing TO: Blair Wondzell FROM: Chris West DATE: October 27, 1995 SUBJECT: MPB-24 Well Suspension APl # 50-029-22642 Blair; Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- AAC 25.110. As discussed this morning we propose setting three plugs in this well as detailed in the attached form. This will allow us to retain the wellbore for potential future sidetrack or service well use. We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid wastes. There areno other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the rig. Thank you for your help in this matter. Please call me if I maY be of any assistance. Chris West Drilling Operations Engineer Nabors 27E (907)-564-5089 95 ..... i54 CN/GR '-- TVD ~?.,EPiA 95-~i54 Ci"q/,SR --- TVD ~ SEPI/:'-, PBi 95 .... 'i54 EWF.:I',3R --- ND ~ SEPIA 95'~-i54 EWR./'GR '~ MD ..~SEF'IA I---'~W,i 95~i54 EWR/"GR ~- TVD -C-'x. SEPZA 95-'-1B~. EWR/"GR -'~ TVD ~.. SEPIA F'Bi 95 --~ 'i B z~ 7235 '..-.'T~C N/G R 95 ..... i 54 73 99 ~ 6--~8 ~.~ 'i 2-.- 'i ? 95-~t54 ?bO0 I-~73i6 .... i2625 73 i6 'iB3'ig 'i 0 ~- fi. 0 ? ~,: c oM P L. E T I ON P AT E l//' IA ,,'"gl-/" dry DAZL. Y WEI...L OF'S E [i~/O~/¢f-/' TO ,'..:i ~ t c h ,s ~ p "i e s r' e q u i' r'- e ~ ,~ y e s ~ n d r" e c e 'i' v e d ? Wa s A r" e w e "i 'i \,,ie i'l -i s c 0 N M E N T S -c;] ]Fi 0 I::t I I--I-- I r~l I~ S E !::t~/I r' E S WELL LOG TRANSMITTAL To: State of Alaska August 20, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs -G-21 & G-21PB1 AK-MM-951053 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ytm Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APl#: 50-029-22604-00 1 LDWG formatted LIS tape with verification listing. API#: 50-029-22604-70 5631 Silverado Way, Suite G · Anchorage, A~aska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company m IR I I_1_1 ~ G S E! IRL/I r" I= S To: WELL LOG TRANSMITFAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs G-21 & G-21PB1, AK-MW-50097, AK-MM-951053 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of.' Ytm Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, fiG, Anchorage, AK 99518 L~2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-22604-00 ~g' x 5" TVD Resistivity and Gamma Ray Logs: 50-029-22604-00 c~2" x 5" MD Neutron and Gamma Ray Logs: 50-029-22604-00 ~/2,, x 5" TVD Neutron and Gamma Ray Logs: 50-029-22604-00 G-21 PBh L~2" x 5" MD Resistivity and Cramma Ray Logs: 50-029-22604-70 r~2', x 5" TVD Resistivity and Gamma Ray Logs: 50-029-22604-70 ~/2" x 5" MD Neutron and Gamma Ray Logs: 50-029-22604-70 ,//2. x 5" TVD Neutron and Gamma Ray Logs: 50-029-22604-70 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company LARRY GR~2~ T Attn. P~AS?-:i OiL + GAS CONSEP. VATION ou,~ PORCUPINE DRI%~E AK, 99501. Date: 2 January 1996 Transmittal of Data Sent by: HAND CARRY D ..... Sir/Madam, Enclosed, elease find ~ . ~..e data as described below: DESCRIPTION ~ , ." -' i 1 LDWG TAPE+LIS Run ~ 1 ~ ~_ 3 ~-- 1 LDWG TAPE+LIS Run # 1 ECC Nc. 5603.08 6529.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street ':~'--~';"~- Suite 201 Anchorage, AX 99518 Am u,<i// ? .~.., -'...:.~..... STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP ExpIoration 95-154 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5 o-029-22604 4. Location of well at surface ,!.!~j;.:.:._.~.¢¥._..~ ..... ~.~ ~,_~ 9. Unit or Lease Name 2911'NSL, 2368' WEL, SEC. 12, T11N, R13E At Top Producing Interval AtTotal Depth 908' SNL, 2407' WEL, SEC. 14, T11N, R13E i . Prudhoe Bay Field/Prudhoe Bay Pool 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 67.85 I ADL 028285 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions 10/09/95 11/06/95 11/12/95I N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+-I-VD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 13359'MD/9009' TVD 13272'MD/9006' TVD YES [] r~ []I 2154 feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, L WD, DIR/FE/DD, NEU, GR, RES 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE VVT. PER FT. GRADE TOP Be'Fi'OM HOLE SIZE CBVIENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 107' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# NT-80 33' 3509' 12-1/4" 99o sx cs///, 3o5 sx 'G', 310 sx CS fl 7" 26# NT-80 33' 9838' 8-1/2" 7" 29# NT-80 9838' 10602' 8-1/2" 330 sx Class 'G' 4-1/2" 12. 6# L-80 10441' 13359' 6" 305 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 4-1/2" 9878' 9822' MD TVD 26. ACID, FRACTURE, CEMENT SQUEI=TF, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10790' - 11075' 9021'- 9017' Freeze Protect w/FO Bbls Diesel 12700'- 13240' 9001'- 9006' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) November 23, 1995 Flowing Date of Test Hours Tested PRODUCTION FOR DIL-BBL GAS-MCF WATER-BBL CHOKE SlZE IGAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED.1~ iOIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. Form 10-407 ~.~¢~ Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEFrI-H TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9396' 8429' Shublik 9442' 8465' Top of Sadlerochit 9545' 8545' 31. LIST OF AI-I-ACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ,/~, F\ ,,... Signed ' ?~/"~'/ '~' T,tle _ ~:~-~i¢..¢-.. Senior Drilling Enclineer Date ['"'/;i"""/:l "-' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hyd,.'aulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 '1 _ I I I I I I A~INUILA~ ~INJEO1T~©IN ~A%AI~ASE A~ L~ SurfCsgDep3509 TotaIWell Cum ~'Cum Mud/Ctg ~~ Cum Brine ,~~ Cum Water ?~~ ~~{~ ?,~ ~=, [ Cum Dies/FP VOLUME (EELS Method 'of displosal=pumping down outer annu/us, , SouRCE WELLI ~T~ OF DIESE~ FREEZE_ _' _..I COMPLICATIONS COMMENTS NUMBER [ INJECt'ION MUD/CTGS BRINE WATER PROT. uaily cum. ~otal~ , ~ 0PI ' G-21 1 0/22/95 300 65 ,, ~{~[~[~ ~[[~[~ 90 S ~-2~ 10 / 2 3 / ~ 5 ~ ~ 0 ? ~?;~;~ ~ ~?~?~ ~ ~: 950 PS~ G-21 1 0/24/95 90.00 ~]]]~]!~';~4~;]~'~]~:~1000 SI ~----- 1 0 / 2 7 / 9 5 1 0 0 -' 1 6 5.0 0 , '~ ~ ~;~. ~ i?:~'~;~[ ?:~ ~[~ ~{~ ~ ;~i8~ 900 PSI &-:-~ ~ ................................. ~'0'/~-~"~'~ ............ ~e. o o .......................................................................... ~:;~ ~ ~ ~:~ ~ ~;:~ ?,~:,~ ~,~8~ ~CF~7 ................................ ~-~- ......... ~~-~-~'~-~- .................. 7~ .................... 7~0 Ps, .................................. G-21 ~1/~/95 120.00 PS~ '~: 21 ...... ~ i ~ 2 ~ 9 ~ ~' 20-; 0 O~ .................. ~ [:,~ ~:, '~ ....... ~7/~--- 1 34.00 -----~~ ...... --:~ ~;~: ~ ?. 750 PSI G-21 1 1 / 5/9 5 308.00 -- 750 PSI ~'~ ............ ~% ..... ~7~5' ....... ~ ....................................... ...................... --- ......... ~ ..... ~-- ................. ~-~'~- 1 35 00 .................. 750 PSI ~-~ .... -'~-"-~~5-- 5o.o0 ----~ ..... ~ ....... ~1 ~ ~;'~ 1~9/95 - 110.00 688.00 300.00 .... 750 PSI H20 INCLUDES 200 EeL CMT WASH ~d_ ~ ~. ~1 0/9~ -- __~:.0~ ............................................. ~ ~ ~ , 1 1/1 1/95 30.00 30:00 75O PSI ~ c~, o~ .... . - ...................... Page 1 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: G-21 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 10/08/95 07:00 SPUD: RELEASE: 11/12/95 11:59 OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 10/09/95 ( 1) TD: 107'( 0) 10/10/95 (2) TD: 1650' ( 1543) 10/11/95 ( 3) TD: 3520'(1870) 10/12/95 ( 4) TD: 3520' ( 0) 10/13/95 ( 5) TD: 5120' (1600) 10/14/95 ( 6) TD: 6054'( 934) 10/15/95 ( 7) TD: 6919'( 865) PU BHA MW: 0.0 VIS: 0 MIRU. MOVE F/E-39 T/G-21. NU DIVERTER. COMISSIONED DRILLFLOOR/DERRICK. CLEAN RIG BUILD AROUND CUTTING TANK. INSPECT MASK. RIG ACCEPTED @ 1900 HRS., 10/08/95. RUN BHA #1. RU DRILLSTRING HANDLING EQUIP. PU BHA. TO RIG FLOOR MEASURE SAME. DRLG AND SURVEY T/1650' MW: 0.0 VIS: 0 BHA #1. FUNCTION TEST DIVERTER. DRILLED AND SURVEY FROM 107' TO 294'. MWD WOULD NOT TAKE SURVEY. POOH, CHANGE OUT MWD TOOL. RIH T/294'. TOOK ACCEPTABLE MWD SURVEY AT 203'. CIRC, FLOW CHECK. DRILLED T/1650'. BHA LAID OUT MW: 0.0 VIS: 0 BHA %2. DRILLED T/2553'. POOH T/ll18', NO HOLE PROBLEM. RIH T/2553', ON BOTTOM. DRILLED T/3520', REACHED PLANNED END OF RUN. CBU, POOH T/2330'. RIH T/3520'. CBU, POOH T/ll18'. BHA PULLED AND LAID OUT. R/D BOP HANDLING EQUIP MW: 0.0 VIS: 0 RAN CASING T/2130', CBU. RAN CASING T/3509', HANG~R LANDED, CBU. MIX AND PUMPED CEMENT SLURRY TO CEMENT 9-5/8 CASING. CIP AT 1600 HRS. EQUIPMENT WORK. DRILLED T/5120' MW: 0.0 VIS: 0 BHA #3, RIH T/3426, FLOAT COLLAR. CBU, PRESSURE TEST CASING. DRILLED FLOAT COLLAR, CEMENT, SHOE AND 10' OF NEW HOLE. CIRC AT 3530', DRILLED T/4506'. POOH T/3520', RIH T/4506'. DRILLED T/5120' CBU AT 6054' MW: 0.0 VIS: 0 BHA #3, DRILLED T/5126'. BIT QUIT, CIRC, HEAVY SLUG SPOTTED DOWNHOLE. POOH T/llO0', STOOD BACK BHA. MIXED AND PUMPED CEMENT SLURRY. BHA #4, RIH T/5035', REAMED T/5126'. DRILLED T/6054', BIT QUIT, CBU. DRILL T/6919' MW: 0.0 VIS: 0 BHA %4 PULLED AND STOOD BACK. BHA #5, RIH T/6054', SHALLOW TEST MWD. DRILLED T/6919' WELL : G-21 OPERATION: RIG : NABORS 28E PAGE: 2 10/16/95 (8) TD: 7395' ( 476) 10/17/95 (9) TD: 8721' (1326) 10/18/95 (10) TD: 9607' ( 886) DRILLED T/7395', SLIDING MW: 0.0 VIS: 0 BHA #5, DRILLED T/7381'. ROP DROPPED, FORMATION CHANGE. POOH T/ CHANGE BHA, CBU AT 7381'. POOH T/l108', BHA PULLED AND STOOD BACK. BHA #6, RIH T/7381', CHECK MWD AT 5053' DRILLED T/7395', SLIDING TO RISE ANGLE. DRILLED T/8721' MW: 0.0 VIS: 0 BHA #6, DRILLED T/8626'. CBU, POOH T/7200'. RIH T/8620', TIGHT 8270' TO 8300'. DRILLED T/8721'. DRILLED T/9607' MW: 0.0 VIS: 0 BHA #6, DRILLED, SLID AND SURVEY 8721' TO 9607'. 10/19/95 (11) TD: 9860' ( 253) 10/20/95 (12) TD: 10117' ( 257) 10/21/95 (13) TD:10613' ( 496) 10/22/95 (14) TD: 10613' ( 0) 10/23/95 (15) TD:10613' ( 0) DRILLING W/ROTARY DRLG ASSY MW: 0.0 VIS: 0 BHA #6, DRILLED T/9763', ROP DROPPED, BIT QUIT. CBU, DOWNHOLE WASHOUT. POOH LOOKING FOR WASHOUT, FOUND. PULLED AND STOOD BACK BHA. TESTE WELL CONTROL EQUIPMENT. BHA #7, RIH T/3600', 9-5/8" CASING SHOE. RIH T/9410', TAG BRIDGE AT 9250' COULD NOT WORK THROUGH, REAM, TIGHT HOLE AT 9410' REAMED T/9670'. AT TOP OF RESERVOIR, 9670'. LOGGED HOLE W/LWD: DIR/FE/DD. MAD PASS WITH NEUTRON 9670' TO 9763' DRILLED T/9860' POOH TO ADJUST MOTOR MW: 0.0 VIS: 0 BHA #7, DRILLED T/9965', REACHED PLANNED END OF RUN. CBU, POOH T/ll00', NO PROBLEMS, HOLE FILL NORMAL. PULLED BHA, DOWNLOAD LWD. TEST WELL CONTROL EQUIPMENT. WITNESS OF TEST WAIVED BY DOUG AMOS, AOGCC. BHA #8, RIH T/9965', SURVEY. DRILL T/10117', BUILD RATE UNACCEPTABLE. CBU, POOH T/4000', TO ADJUST MOTOR. POOH T/ll00' FOR HOLE OPENER MW: 0.0 VIS: 0 BHA #8 PULLED AND STOOD BACK. BHA #9, CHANGE BIT DUE TO BROKEN TEETH. RIH T/10117', DRILLED T/10256'. CBU, DRILLED T/10593', BUILD ANGLE. CBU, DRILLED T/10613', REACHED PLANNED END OF RUN. CBU, POOH T/ll00' FOR HOLE OPENER RUN SLM. RAN CASING 7" CASING T/1000' MW: 0.0 VIS: 0 BHA #9, PULLED AND STOOD BACK. BHA #10, W/8-1/2" HOLE OPENER. RIH T/9616', REAMED T/10613'. CBU, TEST WELL CONTROL EQUIPMENT. RAN CASING T/1000' CBU BEFORE CASING TEST MW: 0.0 VIS: 0 RUN 7' OD CASING T/10602'. CBU, MIX AND PUMP CEMENT SLURRY. RELEASED TOP PLUG, BUMP PLUG T/3000 PSI. TEST WELL CONTROL EQUIPMENT. BHA #11, TIH, TAG CEMENT AT 10340'. WASHED T/10516', TOP OF FLOAT COLLAR PLUGS. WELL : G-21 OPERATION: RIG : NABORS 28E PAGE: 3 10/24/95 (16) TD:l1380' ( 767) 10/25/95 (17) TD:11722' ( 342) 10/26/95 (18) TD:12460' ( 738) 10/27/95 (19) TD:12672' ( 212) 10/28/95 (20) TD:10600' ( 0) 10/29/95 (21) TD:10840' ( 240) 10/30/95 (22) TD:11336' ( 496) 10/31/95 (23) TD: 11336' ( 0) DRILLED T/11380' MW: 0.0 VIS: 0 BHA #11, CBU AT 10516', BEFORE CASING TEST, TOP OF FLOAT COLLAR PLUG. PRESSURE TEST 7" CASING. DRILL FLOAT EQUIPMENT, CEMENT AND 10' OF NEW FORMATION T/10623'. CBU, DISPLACE TO FLO-PRO MUD SYSTEM. DRILLED T/11380' DRILLED T/11722' MW: 0.0 VIS: 0 BHA #11, DRILLED T/11689' CBU, POOH T/ll00', NO PROBLEMS, HOLE FILL NORMAL. PULLED AND STOOD BACK BHA. BHA #12, RIH T/10602'. LOGGED HOLE WITH LWD: DIR/FE. DRILLED T/11722'. DRILLING MW: 0.0 VIS: 0 DRILL T/11786, CBU. DRILL T/12460'. DIFFICULTY BUILDING ANGLE. TIH TO SET PLUGBACK CMT PLUG MW: 0.0 VIS: 0 BHA #12, DRILLED T/12672'. CBU, PUMP SLUG, OBTAINED REQUIRED GEOLOGICAL SAMPLES. POOH T/ll00', STAND BACK BHA. TEST WELL CONTROL EQUIPMENT. TIH, PREPARING TO SET PLUGBACK CEMENT PLUG 12672' TO 200' INSIDE 7" CASING AT 10402' 7" SHOE AT 10602' POOH FOR KICK OFF BHA MW: 0.0 VIS: 0 FINISH TIH WITH 3-1/2" MULE SHOE. CIRC AT 12672'. BROKE CIRC, BATCH MIXED CEMENT SLURRY. PUMPED SLURRY, PULLED DP T/9000'. CIRC OUT LONG WAY, TRACE OF CEMENT BACK. PUMP SLUG. CBU, FINISH POOH. BHA #13, M/U ROTARY CLEAN OUT BHA. RIH T/10156', TAG CEMENT STRINGER. DRILL CEMENT STRINGS AT 10156' TO 10295'. DRILL FIRM CEMENT 10295' T/10600'. CBU, POOH T/4000'. DRILLING MW: 0.0 VIS: 0 POOH W/DP, L/D CLEAN OUT BHA. M/U BHA #iA, SIDETRACK BHA. TIH T/10572', DRILL CEMENT PLUG 10602' TO 10645' DISPLACED TO NEW FLO-PRO MUD AFTER SIDETRACKED. DIRECTIONALLY DRILL 10645' TO 10840' TRIP FOR HOLE OPENER MW: 0.0 VIS: 0 DIRECTIONALLY DRILL 10840' TO 11336', CBU. POOH T/7" CASING SHOE AT 10600'. OBSERVE WELL, PUMP SLUG. POOH TO BHA 1100' DOWNLOAD LWD, CHANGE PROBE, STAND BACK BHA. M/U FISHING ASSEMBLY, TIH W/REVERSE JET BASKET. WASH AND REAM 10779' TO 10809' CAN'T GET BELOW 10809', ASSEMBLY WILL NOT MAKE TURN DOWN. CIRC, MIX AND PUMP SLUG. POOH FOR 6" HOLE OPENER. POOH W/FISH MW: 0.0 VIS: 0 FINISH POOH W/DP T/ll00', AT BHA. STOOD BACK BHA. TIH WITH MILL, TAG TOP OF FISH AT 10795'. MILL OUT INSIDE OF REVERSE JET BASKET. OBSERVE WELL, PUMP SLUG. POOH, L/D MILL AND BOOT BASKET. WELL : G-21 OPERATION: RIG : NABORS 28E PAGE: 4 11/01/95 (24) TD:11336' ( 0) 11/02/95 (25) TD:11338' ( 2) 11/03/95 (26) TD:11442' ( 104) 11/04/95 (27) TD:12155' ( 713) 11/05/95 (28) TD:12852' ( 697) 11/06/95 (29) TD:13228' ( 376) 11/07/95 (30) TD:13359' ( 131) 11/08/95 (31) TD:13359' ( 0) OPENED HOLE T/l1200' MW: 0.0 VIS: 0 BHA #4, POOH T/ll00', BHA STOOD BACK. BHA #5, FISHING ASSEMBLY, RIH T/10759. FISHED AT 10797', POOH WITH FISH. BHA #6, RIH T/10600', OPENED HOLE T/11200' TRIPPING OUT WITH MILL MW: 0.0 VIS: 0 BHA #6, REAMED T/11336'. CBU, POOH T/11336', BHA LAID OUT. BHA #7, RIH T/11153', UNABLE TO GET PAST 11153'. POOH T/10602', FLOW CHECK, OBSERVED WELL STATIC. POOH T/120' BHA LAID OUT. BHA #8, RIH T/10782', WASHED T/11333' MILLED DOWNHOLE TOOLS AT 11338'. FLOW CHECK, OBSERVED WELL STATIC. POOH T/6500' TESTING STACK MW: 0.0 VIS: 0 BHA #8 PULLED AND LAID OUT. BHA 9, RIH T/11305', SURVEYED. CIRC, WASHED T/11338', WORKED PAST JUNK, DRILLED T/11442', BIT QUIT. CBU, OBSERVED WELL STATIC. POOH T/200', MAD PASS TO CASING SHOE. BHA STOOD BACK, TEST WELL CONTROL EQUIPMENT. POOH T/9600' MW: 0.0 VIS: 0 TEST WELL CONTROL EQUIPMENT. BHA #9, RIH T/11442'. DRILLED T/12155', CBU. LOGGED HOLE WITH LWD. FLOW CHECK, OBSERVED WELL STATIC. POOH T/9600' ~POOH T/9800' MW: 0.0 VIS: 0 BHA #9, POOH T/9600', STOOD BACK BHA. BHA #10, RIH T/12155', DRILLED T/12852'. CBU, LOGGED HOLE WITH LWD. POOH T/10602', 7" CASING SHOE. FLOW CHECK, OBSERVED WELL STATIC. POOH T/9800' POOH T/8000' MW: 0.0 VIS: 0 BHA #10, POOH T/200', STOOD BACK BHA. BHA #11, RIH T/12852'. DRILLED T/13228', ROP DROPPED, BIT QUIT. CBU, LOGGED HOLE WITH LWD. POOH T/10602'. FLOW CHECK, OBSERVED WELL STATIC. POOH T/8000' RIH T/11330' MW: 0.0 VIS: 0 BHA #11 PULLED AND STOOD BACK. BHA %12, RIH T/13168', WASHED T/13228'. DRILLED T/13359', PLANNED END OF RUN. CBU, LOGGED HOLE WITH LWD, FE. L/D DP, FLOW CHECK, OBSERVED WELL STATIC. POOH T/200', BHA LAID OUT. BHA %13, RIH T/11330' POOH T/7200', DROP RABBIT MW: 0.0 VIS: 0 BHA %13, RIH T/10825'. L/D 450' OF DP. REAMED T/12213'. GOT STUCK WHILST PIPE MOVING. WORKED STUCK PIPE AT 12170' JARRED, PIPE CAME FREE. REAMED T/12245', NO FURTHER RESISTANCE. REAMED T/13359', CBU. POOH T/10602'. FLOW CHECK, OBSERVED WELL STATIC, PUMP DRY JOB. L/D 1830' OF DP. POOH T/7200', DROP RABBIT. WELL : G-21 OPERATION: RIG · NABORS 28E PAGE: 5 11/09/95 (32) TD: 0 PB: 0 11/10/95 (33) TD: 0 PB: 0 11/11/95 (34) TD:13272 PB: 0 11/12/95 (35) TD:13272 PB: 0 11/13/95 (36) TD:13272 PB: 0 PULLED DP MW: 0.0 RUN BHA #13. POOH T/200'. PULLED BHA. RAN 4-1/2" CASING T/3000'. CBU @ 3000'. RAN DP ON LANDING STRING T/6200'. RAN DP T/10602' @ 7" CASING SHOE. CBU @ 10602'. BROKE CIRC. RAN DP T/13~59'. CBU @ 13359'. BATCH MIXED SLURRY. PUMPED SPACERS. CEMENT PUMPED, PLUG BUMPED. CBU @ 10441'. PRESSURE UP SET HANGER. PACKER SET @ 10450'. REV CIRC @ 10441'. RD HIGH PRESSURE LINES. PULL 3-1/2" DP T/9000'. PULLED DP T/2000' L/D 2-7/8" DP MW: 0.0 PULLED DP IN STANDS T/60'. WORKED ON BOP STACK. SINGLED IN DP T/3000'. RIH T/13268', AT LANDING COLLAR. CBU, TEST CASING. POOH T/3000' L/D 2300' OF 2-7/8" OD DP. LD DP MW: 0.0 RUN BHA #14. LD DP. PULLED BHA. TEST WELL CONTROL EQUIP. RETRIEVE BORE PROTECTOR. INSTALL BOP TEST PLUG ASSY. TEST BOP STACK. RETRIEVE BOP TEST PLUG ASSY. INSTALL BORE PROTECTOR. RUNNING TOOL RETRIEVED. RUN BHA #15. PERF GUNS & PACKER ASSY MU. RIH T/13272'. SET RETRIEVALBE PACKER @ 10114'. FUNCTION DOWNHOLE TOOLS. PRESSURE UP ON BYPASS & FIRE GUNS. REV CIRC @ 10114'. POOH T/12807'. AT TOP OF CHECK TRIP INTERVAL. FLOW CHECK. LD DP. RUN TUBING MW: 0.0 RUN BHA #15. LD DP. PULLED BHA. LD PERF GUNS. PULLED BHA. RUN 4-1/2" SINGLE COMPLETION. LOAD OUT ATLAS. RETRIEVE BORE PROTECTOR. RUN TUBING T/7580' SCSSV NIPPLE ASSY INSTALLED. RAN TUBING T/9800' RIG RELEASED MW: 0.0 RAN 4-1/2" TUBING T/9870'. INSTALLED TUBING HANGER. RAN TUBING T/9877', HANGER LANDED AND TESTED. PACKER SET AT 9822' AND TESTED. INSTALLED HANGER PLUG, R/D BOP STACK. INSTALLED XMAS TREE, REMOVED HANGER PLUG. HOLE DISPLACED W/DIESEL FOR FREEZE PROTECTION. RIG RELEASED 11/12/95 AT 11:59 HRS. SIGNATURE: (drilling superintendent) DATE: SP'~-~Y-SUN DRILLING SERVICES ANCHOI~AGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-21 500292260400 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110695 MWD SURVEY JOB NUMBER: AK-MM-951053 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERTo SECT. 10591 9038.02 8970.17 10602 9037.78 8969.93 10606 9037.63 8969.78 10620 9036.89 8969.04 10652 9034.16 8966.31 90 42 S 73.02 W .00 2983.595 2684.84W 91 52 S 73.70 W 12.84 2986.615 2694.94W 92 16 S 73.48 W 10.62 2987.825 2699.06W 93 41 S 72.77 W 11.24 2991.895 2712.47W 96 9 S 71.15 W 9.27 3001.715 2742.61W 3924.62 3934.57 3938.62 3951.87 3982.04 10683 9030.84 8962.99 10714 9027.46 8959.61 10745 9024.37 8956.52 10775 9021.77 8953.92 10809 9020.23 8952.38 96 16 S 69.96 W 3.88 3011.855 2771.34W 95 58 S 68.29 W 5.33 3023.075 2800.76W 95 40 S 69.09 W 2.78 3034.105 2829.04W 94 8 S 72.18 W 11.37 3044.105 2857.49W 91 6 S 71.53 W 9.16 3054.625 2889.60W 4011.24 4041.66 4071.03 4099.94 4132.11 10842 9019.66 8951.81 10874 9019.39 8951.54 10906 9019.48 8951.63 10938 9019.55 8951.70 10970 9019.17 8951.32 90 52 S 71.03 W 1.68 3065.185 2920.76W 90 5 S 71.79 W 3.40 3075.405 2951.16W 89 35 S 71.57 W 1.67 3085.525 2981.70W 90 7 S 74.01 W 7.80 3094.975 3012.23W 91 16 S 74.52 W 3.96 3103.595 3042.82W 4163.55 4194.16 4224.82 4255.09 4284.93 11001 9018.47 8950.62 11034 9017.67 8949.82 11065 9017.03 8949.18 11097 9016.78 8948.93 11129 9016.45 8948.60 91 14 S 72.32 W 6.93 3112.645 3073.22W 91 37 S 69.65 W 8.37 3123.135 3103.66W 90 39 S 71.55 W 6.71 3133.695 3133.64W 90 15 S 68.32 W 10.27 3144.575 3163.42W 90 55 S 68.35 W 2.13 3156.385 3193.14W 4314.85 4345.66 4376.14 4406.63 4437.63 11161 9015.56 8947.71 11190 9014.08 8946.23 11222 9012.40 8944.55 11254 9010.71 8942.86 11286 9008.51 8940.66 92 16 S 69.26 W 5.14 3167.815 3222.64W 93 27 S 69.17 W 4.00 3178.295 3250.25W 92 37 S 71.51 W 7.82 3188.945 3280.05W 93 28 S 71.58 W 2.65 3198.985 3310.14W 94 30 S 69.54 W 7.20 3209.505 3339.94W 4468.22 4496.73 4527.11 4557.37 4587.67 11316 9006.27 8938.42 11348 9004.57 8936.72 11381 9004.47 8936.62 11410 9005.33 8937.48 11442 9005.40 8937.55 93 58 S 69.95 W 2.18 3219.955 3368.27W 92 0 S 71.87 W 8.48 3230.565 3398.93W 88 22 S 74.12 W 13.10 3240.105 3430.10W 88 16 S 73.46 W 2.27 3248.315 3458.35W 91 28 S 73.90 W 10.29 3257.155 3488.55W 4616.75 4647.80 4678.64 4706.33 4735.98 11474 9003.88 8936.03 11506 9001.73 8933.88 11537 8999.78 8931.93 11569 8998.32 8930.47 11599 8997.47 8929.62 93 58 S 73.61 W 7.86 3266.065 3519.12W 93 45 S 73.26 W 1.29 3275.175 3549.75W 93 26 S 71.36 W 6.20 3284.575 3579.23W 91 47 S 69.98 W 6.72 3295.155 3609.38W 91 23 S 70.40 W 1.89 3305.545 3638.23W 4765.97 4796.12 4825.51 4856.13 4885.58 Date ~ ,3/ SP:~!Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-21 500292260400 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110695 MWD SURVEY JOB NUMBER: AK-MM-951053 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11630 8996.84 8928.99 11659 8996.46 8928.61 11691 8996.20 8928.35 11723 8996.08 8928.23 11754 8996.21 8928.36 90 59 S 70.79 W 1.84 3315.62S 3666.86W 90 29 S 71.89 W 4.08 3325.09S 3694.90W 90 27 S 72.16 W .85 3334.96S 3725.30W 89 56 S 70.98 W 4.02 3345.09S 3755.72W 89 35 S 70.80 W 1.24 3355.25S 3785.02W 4914.68 4942.95 4973.35 5003.94 5033.62 11785 8996.31 8928.46 11817 8995.85 8928.00 11847 8994.98 8927.13 11879 8994.11 8926.26 11910 8993.54 8925.69 90 0 S 72.07 W 4.41 3364.86S 3813.65W 91 39 S 70.80 W 6.48 3375.13S 3844.23W 91 39 S 71.41 W 2.04 3384.83S 3872.56W 91 25 S 70.77 W 2.12 3395.29S 3903.10W 90 42 S 69.36 W 5.12 3405.80S 3932.08W 5062.44 5093.24 5121.87 5152.74 5182.38 11943 8993.26 8925.41 11973 8993.06 8925.21 12005 8992.65 8924.80 12036 8992.17 8924.32 12066 8991.72 8923.87 90 15 S 69.17 W 1.49 3417.62S 3963.29W 90 31 S 69.23 W .94 3428.04S 3990.73W 90 55 S 69.27 W 1.24 3439.49S 4020.94W 90 53 S 67.95 W 4.32 3450.64S 4049.41W 90 48 S 68.27 W 1.10 3461.94S 4077.54W 5214.58 5242.91 5274.09 5303.69 5333.10 12097 8991.38 8923.53 12132 8991.25 8923.40 12163 8991.38 8923.53 12195 8991.66 8923.81 12227 8992.13 8924.29 90 27 S 70.90 W 8.47 3472.86S 4106.88W 89 58 S 72.40 W 4.59 3483.69S 4139.53W 89 34 S 74.75 W 7.56 3492.60S 4169.77W 89 25 S 76.48 W 5.43 3500.54S 4200.72W 88 51 S 74.66 W 5.99 3508.47S 4231.51W 5363.27 5396.07 5425.79 5455.51 5485.09 12259 8992.88 8925.03 12291 8993.38 8925.54 12323 8993.44 8925.59 12353 8993.42 8925.57 12387 8993.54 8925.69 88 28 S 73.80 W 2.94 3517.18S 4262.35W 89 45 S 74.45 W 4.43 3526.03S 4293.48W 90 3 S 74.13 W 1.39 3534.72S 4324.39W 90 0 S 75.20 W 3.58 3542.64S 4353.27W 89 35 S 74.35 W 2.82 3551.39S 4385.42W 5515.18 5545.58 5575.71 5603.74 5634.91 12417 8993.95 8926.10 12449 8994.73 8926.88 12481 8995.80 8927.95 12512 8996.67 8928.82 12543 8997.19 8929.34 88 53 S 73.64 W 3.26 3559.88S 4415.02W 88 18 S 75.81 W 7.02 3568.31S 4445.88W 87 50 S 74.98 W 2.96 3576.35S 4476.72W 88 51 S 74.32 W 3.99 3584.34S 4505.84W 89 15 S 73.00 W 4.37 3593.22S 4536.13W 5663.87 5693.81 5723.50 5751.77 5781.51 12575 8997.83 8929.98 12607 8998.68 8930.83 12638 8999.55 8931.70 12670 9000.14 8932.29 12703 9000.68 8932.83 88 27 S 72.53 W 2.89 3602.73S 4566.80W 88 25 S 74.41 W 6.00 3611.65S 4596.84W 88 25 S 72.53 W 5.91 3620.69S 4627.29W 89 26 S 73.68 W 4.83 3629.94S 4657.76W 88 38 S 72.77 W 3.72 3639.39S 4689.09W 5811.93 5841.48 5871.45 5901.55 5932.46 SP'~-~Y-SUN DRILLING SERVICES ANC}IORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-21 500292260400 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110695 MWD SURVEY JOB NUMBER: AK-MM-951053 KELLY BUSHING ELEV. = 67.85 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DGMN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 12733 9001.10 8933.25 89 46 S 71.38 W 5.91 3648.75S 4718.03W 12764 9001.04 8933.20 90 25 S 74.55 W 10.68 3657.62S 4747.00W 12798 9000.89 8933.04 90 5 S 73.54 W 3.12 3667.00S 4779.81W 12830 9001.04 8933.20 89 20 S 72.75 W 3.40 3676.23S 4810.28W 12861 9001.39 8933.54 89 '22 S 75.16 W 7.77 3684.81S 4840.09W 5961.39 5990.06 6022.13 6052.22 6081.40 12891 9001.92 8934.07 88 38 S 74.45 W 3.34 3692.84S 4869.67W 12921 9002.75 8934.90 88 7 S 75.53 W 4.05 3700.50S 4898.23W 12956 9003.89 8936.04 88 6 S 74.16 W 3.96 3709.53S 4931.58W 12984 9004.82 8936.97 88 12 S 72.21 W 6.74 3717.90S 4959.27W 13018 9005.51 8937.66 89 24 S 74.06 W 6.60 3727.58S 4991.20W 6110.07 6137.69 6169.99 6197.33 6228.87 13081 9005.76 8937.91 90 9 S 74.23 W 1.20 3744.92S 5052.27W 13112 9005.60 8937.75 90 25 S 71.32 W 9.42 3754.12S 5081.92W 13145 9005.35 8937.50 90 27 S 74.24 W 9.05 3763.66S 5112.72W 13178 9005.20 8937.35 90 3 S 72.20 W 6.23 3773.29S 5144.65W 13208 9005.38 8937.53 89 15 S 75.72 W 11.96 3781.63S 5173.64W 6288.49 6317.90 6348.44 6379.94 6408.31 13238 9005.78 8937.93 89 10 S 75.80 W .41 3788.92S 5202.37W 13269 9006.32 8938.47 88 51 S 75.59 W 1.20 3796.63S 5232.61W 13302 9007.22 8939.37 88 3 S 75.71 W 2.46 3804.88S 5264.85W 13359 9009.13 8941.28 88 3 S 75.71 W .00 3818.74S 5319.29W 6435.86 6464.87 6495.82 6548.04 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CI/RVATURE METHOD. HORIZONTAL DISPLACEMENT = 6548.10 FEET AT SOUTH 54 DEG. 19 MIN. WEST AT MD = 13359 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 234.08 DEG. SP~tY- SUN DRILLING SERVICES ANCHORAGE ALD~g KA PAGE 4 SHARED SERVICES DRILLING PBU/G-21 500292260400 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110695 JOB NUMBER: AK-MM-951053 KELLY BUSHING ELEV. =' 67.85 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10591 9038.02 11591 8997.67 12591 8998.25 13359 9009.13 8970.17 2983.59 S 2684.84 W 1553.64 8929.82 3302.79 S 3630.50 W 2593.99 1040.35 8930.40 3607.50 S 4581.96 W 3593.41 999.42 8941.28 3818.74 S 5319.29 W 4349.87 756.46 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP?~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 SHARED SERVICES DRILLING p U/G-21 500292260400 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110695 JOB NUMBER: AK-MM-951053 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10591 9038.02 8970.17 13359 9009.13 8941.28 2983.59 S 2684.84 W 1553.64 3818.74 S 5319.29 W 4349.87 2796.23 THE CALC~TION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPF~-RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110195 MWD SURVEY JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -67.85 203 203.00 135.15 303 302.99 235.14 394 394.64 326.79 483 483.32 415.47 0 0 N .00 E .00 .00N .00E 0 12 S 29.40 W .10 .31S .17W 1 12 S 88.00 W 1.11 .50S 1.31W 1 30 N 89.70 W .33 .52S 3.47W 2 8 S 88.00 W .73 .58S 6.28W .00 .32 1.35 3.11 5.43 572 572.52 504.67 662 661.74 593.89 752 751.61 683.76 840 839.56 771.71 929 929.26 861.41 2 42 S 87.80 W .63 .72S 10.05W 3 0 N 88.70 W .39 .74S 14.49W 3 17 S 88.50 W .37 .76S 19.43W 3 5 N 89.90 W .25 .82S 24.35W 4 0 S 85.80 W 1.04 1.04S 29.91W 8.56 12.17 16.18 20.20 24.83 1021 1020 . 06 952 . 21 1110 1109 . 44 1041 . 59 1141 1140.28 1072.43 1236 1235 . 00 1167 . 15 1331 1329 . 38 1261 . 53 4 41 S 83.80 W .79 1.68S 36.78W 4 48 S 74.80 W .84 3.06S 44.06W 4 48 S 73.80 W .27 3.76S 46.55W 4 48 S 59.90 W 1.22 6.87S 53.81W 4 54 S 60.20 W .11 10.86S 60.75W 30.77 37.47 39.91 47.60 55.57 1426 1424.11 1356.26 1521 1518.73 1450.88 1616 1612.55 1544.70 1711 1707.45 1639.60 1806 1801.54 1733.69 5 48 S 59.30 W .95 15.34S 68.41W 6 11 S 52.80 W .83 20.90S 76.63W 6 54 S 52.30 W .74 27.45S 85.18W 8 16 S 48.60 W 1.53 35.53S 94.91W 8 6 S 49.10 W .20 44.44S 105.10W 64.40 74.32 85.09 97.70 111.19 1902 1895.66 1827.81 1934 1927.26 1859.41 1965 1958.65 1890.80 2029 2021.36 1953.51 2060 2052.71 1984.86 8 18 S 49.00 W .21 53.33S 115.35W 8 23 S 47.60 W .71 56.41S 118.81W 8 23 S 49.00 W .64 59.50S 122.27W 7 24 S 65.00 W 3.80 64.25S 129.45W 7 54 S 56.70 W 3.83 66.31S 133.12W 124.70 129.31 133.92 142.53 146.70 2156 2147.49 2079.64 2186 2177.89 2110.04 2282 2273.18 2205.33 2377 2367.39 2299.54 2473 2462.15 2394.30 6 35 S 77.80 W 3.08 71.07S 143.97W 6 30 S 81.80 W 1.53 71.69S 147.41W 7 35 S 77.70 W 1.26 73.82S 158.99W 7 35 S 67.60 W 1.40 77.55S 170.94W 6 24 S 55.30 W 2.00 82.99S 181.15W 158.29 161.43 172.06 183.93 195.39 2569 2557.83 2489.98 2662 2650.89 2583.03 2759 2747.75 2679.90 2853 2841.45 2773.60 2947 2935.51 2867.66 4 48 S 65.90 W 1.97 87.68S 189.23W 4 11 S 72.40 W .84 90.31S 196.06W 3 12 S 69.70 W 1.05 92.33S 201.98W 1 47 S 73.50 W 1.50 93.65S 205.85W 0 42 N 87.20 W 1.24 94.04S 207.84W 204.69 211.75 217.74 221.65 223.49 SPF~-~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3043 3031.24 2963.39 3137 3125.45 3057.60 3233 3221.55 3153.70 3328 3316.50 3248.65 3425 3412.87 3345.02 COURS INCLN DG MN 0 30 0 36 0 30 0 30 0 30 DATE OF SURVEY: 110195 MWD SURVEY JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT· N 69.20 W .28 93.87S 208.82W N 73.30 W .12 93.58S 209.67W N 73.00 W .10 93.31S 210.56W N 71.20 W .02 93.06S 211.35W N 65.50 W .05 92.75S 212.13W 224.18 224.70 225·26 225.75 226.20 3442 3429.78 3361.93 3549 3537.16 3469.31 3580 3568.38 3500.53 3676 3664.26 3596.41 3772 3759.96 3692.11 0 36 0 54 0 36 2 47 3 47 N 73.90 W .76 92.69S 212.28W N 76.20 W .28 92.33S 213.64W N 64.90 W 1.07 92.21S 214.02W S 69.90 W 2.52 92.80S 216.68W S 27.40 W 2.68 96.42S 220.34W 226.29 227.18 227.42 229.92 235.01 3869 3856.86 3789.01 3963 3950.83 3882.98 4058 4044.98 3977.13 4152 4139.25 4071.40 4244 4230.19 4162.34 4 5 4 5 3 35 5 0 5 48 S 14.80 W .94 102.64S 222.71W S 8.20 W .50 109.23S 224.05W S 14.40 W .69 115.44S 225.27W S 23.20 W 1.63 122.10S 227.63W S 33.30 W 1.36 129.62S 231.73W 240.57 245.52 250.15 255.97 263.70 4341 4327.00~ 4259.15 4436 4421.13 4353.28 4529 4512.08 4444.23 4624 4605.22 4537.37 4720 4698.35 4630.50 7 5 9 0 10 48 12 48 15 41 S 38.00 W 1.44 138.47S 238.14W S 37.70 W 1.23 149.47S 246.68W S 36.80 W 1.96 162.11S 256.28W S 38.80 W 2.14 177.47S 268.23W S 36.80 W 3.06 196.18S 282.69W 274.09 287.46 302.65 321.33 344.02 4816 4790.69 4722.84 4911 4881.53 4813.68 5005 4970.66 4902.81 5053 5015.55 4947.70 5101 5060.72 4992.87 5197 5149.96 5082.11 5291 5236.39 5168.54 5387 5320.70 5252.85 5484 5403.77 5335.92 5577 5482.51 5414.66 5673 5563.03 5495.18 5769 5641.15 5573.30 5866 5718.76 5650·91 5959 5791.33 5723.48 6053 5863.96 5796.11 6149 5938.39 5870.54 6243 6010.86 5943.01 6337 6083.72 6015.87 6435 6160.29 6092.44 6529 6233.11 6165.26 16 6 18 12 19 12 19 6 20 47 22 36 25 47 30 12 31 53 32 12 33 54 36 35 38 17 39 17 39 12 39 24 39 5 38 54 38 42 39 30 S 39.10 W .78 216.91S 298.87W S 37.70 W 2.25 238.89S 316.26W S 37.40 W 1.07 262.81S 334.65W S 37.90 W .41 275.15S 344.17W S 37.20 W 3.57 288.15S 354.16W S 38·10 W 1.91 316.26S 375.86W S 39.30 W 3.42 346.56S 400.17W S 38.60 W 4.62 381.44S 428.33W S 38.60 W 1.75 420.52S 459.53W S 38.20 W .40 459.15S 490.15W S 38.10 W 1.77 500.36S 522.52W S 36.10 W 3.07 544.40S 555.79W S 36.10 W 1.74 592.44S 590.81W S 36.00 W 1.08 639.61S 625.15W S 36.30 W .23 687.52S 660.15W S 35.80 W .39 736.78S 696 S 36.00 W .35 784.74S 730 S 37.20 W .83 832.10S 765 S 37.20 W .20 881.14S 803 S 36.50 W .97 928·50S 838 369.29 396.27 425·19 440.14 455.86 489.92 527.38 570.65 618.84 666.31 716.69 769.47 826.02 881.49 937.95 · OOW 995.89 · 72W 1052.14 · 90W 1108.41 .12W 1167.32 · 61W 1223.84 SPF--~'Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G-21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110195 MWD SURVEY JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6625 6307.33 6239.48 6722 6381.69 6313.84 6816 6453.97 6386.12 6911 6527.06 6459.21 7007 6600.98 6533.13 7102 6674.02 6606.17 7195 6745.31 6677.46 7291 6819.14 6751.29 7398 6902.04 6834.19 7495 6977.02 6909.17 7589 7049.40 6981.55 7683 7121.97 7054.12 7777 7193.57 7125.72 7867 7262.33 7194.48 7966 7337.50 7269.65 7997 7360.57 7292.72 8092 7430.53 7362.68 8186 7499.20 7431.35 8281 7570.21 7502.35 8377 7640.83 7572.98 8473 7712.07 7644.22 8567 7782.00 7714.15 8661 7852.01 7784.16 8757 7923.53 7855.68 8853 7995.74 7927.89 8885 8019.67 7951.82 8917 8043.16 7975.31 8948 8066.72 7998.87 8979 8091.45 8023.60 9011 8117.40 8049.55 9043 8143.47 8075.62 9079 8172.96 8105.11 9170 8246.30 8178.45 9264 8322.69 8254.84 9358 8398.71 8330.86 9453 8474.19 8406.34 9485 8499.28 8431.43 9548 8547.66 8479.81 9642 8618.83 8550.99 9730 8684.81 8616.96 39 35 4O 5 39 42 39 47 39 54 39 35 4O 0 39 24 39 12 38 42 40 12 39 35 40 26 39 50 42 12 42 24 42 47 42 5 42 24 42 24 42 12 41 47 41 47 41 24 41 24 41 42 41 30 39 35 37 0 35 12 35 12 35 30 36 5 35 35 36 12 38 42 4O 0 39 42 41 17 41 27 S 37.20 W .47 977.55S 875.36W 1282.39 S 37.60 W .58 1026.85S 913.06W 1341.84 S 37.60 W .42 1074.73S 949.93W 1399.79 S 37.90 W .23 1122.80S 987.15W 1458.13 S 37.70 W .17 1171.55S 1024.97W 1517.35 S 36.30 W .99 1220.06S 1061.53W 1575.42 S 37.40 W .87 1267.58S 1097.14W 1632.14 S 38.10 W .78 1316.05S 1134.67W 1690.96 S 37.70 W .30 1369.59S 1176.35W 1756.13 S 37.30 W .58 1417.67S 1213.25W 1814.22 S 40.60 W 2.75 1463.95S 1250.69W 1871.69 S 41.40 W .83 1509.75S 1290.50W 1930.80 S 43.50 W 1.70 1554.10S 1331.08W 1989.68 S 44.10 W .78 1595.96S 1371.22W 2046.74 S 42.50 W 2.58 1643.57S 1416.05W 2110.98 S 42.80 W .91 1659.00S 1430.27W 2131.55 S 40.60 W 1.62 1707.03S 1473.06W 2194.38 S 38.00 W 2.03 1755.62S 1512.84W 2255.10 S 38.20 W .34 1806.38S 1552.64W 2317.10 S 37.70 W .35 1857.23S 1592.30W 2379.05 S 37.10 W .47 1908.72S 1631.67W 2441.15 S 36.70 W .51 1959.08S 1669.47W 2501.30 S 37.20 W .36 2009.10S 1707.10W 2561.12 S 36.70 W .54 2059.84S 1745.27W 2621.80 S 36.90 W .14 2110.82S 1783.41W 2682.59 S 37.10 W 1.03 2127.75S 1796.17W 2702.86 S 37.40 W .90 2144.36S 1808.80W 2722.83 S 37.50 W 6.13 2160.36S 1821.05W 2742.14 S 36.90 W 8.34 2175.91S 1832.86W 2760.83 S 36.00 W 5.84 2191.13S 1844.10W 2778.86 S 37.60 W 2.89 2205.86S 1855.12W 2796.43 S 39.80 W 3.62 2222.18S 1868.20W 2816.59 S 42.20 W 1.69 2262.09S 1902.90W 2868.10 S 42.60 W .59 2302.84S 1940.11W 2922.15 S 43.10 W .71 2343.19S 1977.54W 2976.13 S 44.50 W 2.78 S 44.20 W 4.05 S 43.80 W .63 S 42.90 W 1.82 S 43.38 W .40 2384.90S 2017.57W 3033.02 2399.61S 2031.95W 3053.29 2428.66S 2060.00W 3093.05 2472.87S 2101.72W 3152.77 2515.28S ~ 2t41..47~,~3~9.84 SPF'--~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G- 21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110195 MWD SURVEY JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9826 8757.10 8689.25 9891 8806.04 8738.20 9946 8847.91 8780.06 9978 8872.05 8804.21 10009 8894.27 8826.42 41 10 S 43.35 W .30 2561.47S 2185.10W 40 32 S 43.38 W .96 2592.25S 2214.17W 40 10 S 43.11 W .74 2618.17S 2238.55W 42 10 S 43.04 W 6.24 2633.60S 2252.97W 45 5 S 42.87 W 9.49 2649.10S 2267.41W 3272.28 3313.87 3348.82 3369.56 3390.34 10039 8915.27 8847.42 10070 8935.33 8867.48 10100 8953.14 8885.29 10131 8970.85 8903.00 10166 8988.15 8920.30 47 58 S 43.51 W 9.59 2665.26S 2282.57W 51 12 S 43.90 W 10.48 2682.29S 2298.86W 54 16 S 44.57 W 10.56 2699.06S 2315.19W 57 36 S 45.40 W 10.78 2717.59S 2333.71W 61 57 S 45.78 W 12.66 2738.37S 2354.93W 3412.10 3435.28 3458.35 3484.22 3513.59 10180 8994.80 8926.95 10199 9002.44 8934.59 10230 9013.81 8945.96 10262 9022.56 8954.71 10294 9028.54 8960.69 63 52 S 45.00 W 14.05 2747.50S 2364.18W 66 45 S 44.79 W 15.77 2759.28S 2375.92W 71 25 S 44.20 W 14.72 2780.51S 2396.78W 76 26 S 44.07 W 15.87 2802.33S 2417.94W 81 43 S 44.28 W 16.75 2824.53S 2439.51W 3526.44 3542.85 3572.20 3602.14 3632.63 10325 9031.68 8963.83 10357 9032.08 8964.23 10389 9031.31 8963.46 10421 9031.27 8963.42 10452 9032.24 8964.39 86 56 S 44.72 W 16.46 2847.11S 2461.70W 91 37 S 45.32 W 14.85 2869.60S 2484.21W 91 9 S 49.95 W 14.66 2890.98S 2507.65W 88 58 S 53.47 W 12.97 2910.72S 2532.66W 87 29 S 56.65 W 11.18 2928.69S 2558.38W 3663.84 3695.28 3726.80 3758.63 3790.00 10484 9033.70 8965.85 10516 9035.34 8967.49 10538 9036.55 8968.70 10571 9037.68 8969.83 10591 9037.72 8969.87 87 16 S 62.27 W 17.55 2944.94S 2585.92W 86 47 S 66.28 W 12.70 2958.70S 2614.48W 86 58 S 69.57 W 14.85 2967.01S 2634.98W 89 4 S 71.70 W 9.10 2977.90S 2665.96W 90 42 S 73.02 W 10.44 2984.01S 2685.16W 3821.83 3853.04 3874.51 3905.99 3925.13 10621 9037.04 8969.19 10652 9035.89 8968.04 10685 9033.70 8965.85 10701 9032.22 8964.37 10717 9030.71 8962.86 91 56 S 74.94 W 7.67 2992.21S 2713.74W 3953.08 92 15 S 77.00 W 6.62 2999.83S 2744.23W 3982.25 95 24 S 76.58 W 9.73 3007.30S 2776.04W 4012.39 95 16 S 78.56 W 12.45 3010.70S 2791.47W 4026.88 95 33 S 76.67 W 11.92 3014.11S 2806.99W 4041.44 10747 9027.92 8960.07 10779 9024.67 8956.82 10811 9021.08 8953.23 10843 9018.58 8950.73 10874 9018.22 8950.38 95 9 S 78.18 W 5.21 3020.58S 2835.99W 4068.73 96 27 S 78.40 W 4.10 3027.07S 2867.30W 4097.89 96 25 S 78.57 W .54 3033.42S 2898.47W 4126.86 92 35 S 75.92 W 14.69 3040.40S 2929.32W 4155.93 88 41 S 75.95 W 12.30 3048.09S 2960.00W 4185.29 10906 9019.00 8951.15 10938 9019.58 8951.73 10969 9019.46 8951.61 11001 9018.88 8951.03 11032 9018.45 8950.60 88 31 S 73.13 W 8.89 3056.56S 2990.63W 4215.07 89 22 S 75.84 W 8.91 3065.09S 3021.38W 4244.98 91 4 S 73.31 W 9.80 3073.37S 3051.36W 4274.il 90 59 S 74.96 W 5.17 3082.10S 3082.08W 4304.11 90 37 S 74.05 W 3.20 3090.31S 3111.68W~W~4332.90 · SP=RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 SHARED SERVICES DRILLING PBU/G- 21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/9 DATE OF SURVEY: 110195 MWD SURVEY JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11062 9018.24 8950.39 11094 9018.04 8950.19 11126 9017.87 8950.02 11157 9017.77 8949.92 11187 9017.13 8949.28 9O 9 90 35 90 1 90 20 92 5 S 72.84 W 4.29 3098.93S 3140.71W 4361.47 S 70.46 W 7.61 3108.94S 3170.88W 4391.78 S 70.29 W 1.85 3119.58S 3200.73W 4422.19 S 70.62 W 1.45 3130.00S 3230.06W 4452.05 S 70.66 W 5.87 3139.93S 3258.34W 4480.79 11217 9015.92 8948.07 11249 9014.67 8946.82 11280 9013.62 8945.77 11313 9013.02 8945.17 11345 9013.25 8945.40 92 24 92 5 91 45 90 22 88 48 S 70.98 W 1.45 3150.01S 3287.30W 4510.14 S 70.56 W 1.64 3160.48S 3317.34W 4540.62 S 69.12 W 4.73 3171.25S 3346.67W 4570.69 S 70.89 W 7.02 3182.22S 3376.81W 4601.53 S 68.98 W 7.73 3193.19S 3406.84W 4632.28 11376 9014.32 8946.47 11407 9015.16 8947.31 11439 9015.36 8947.51 11471 9015.53 8947.68 11501 9015.91 8948.06 87 20 89 28 89 48 89 34 89 0 S 69.50 W 4.83 3204.47S 3436.61W 4663.02 S 67.37 W 9.91 3215.64S 3464.87W 4692.45 S 70.79 W 10.64 3227.17S 3495.03W 4723.65 S 71.31 W 1.82 3237.41S 3524.84W 4753.78 S 71.34 W 1.87 3247.03S 3553.30W 4782.48 11533 9016.81 8948.96 87 45 11564 9018.17 8950.32 87 13 11596 9019.69 8951.84 87 22 11628 9020.52 8952.67 89 41 11659 9020.62 8952.77 89 56 S 71.80 W 4.21 3257.09S 3583.49W 4812.83 S 70.81 W 3.60 3267.07S 3612.98W 4842.57 S 70.17 W 2.05 3277.78S 3643.21W 4873.33 S 73.25 W 11.90 3287.94S 3673.95W 4904.19 S 70.48 W 9.09 3297.46S 3703.03W 4933.32 11691 9020.53 8952.68 11723 9020.38 8952.53 11754 9020.33 8952.48 11785 9020.37 8952.52 11817 9020.45 8952.60 90 22 90 10 90 0 89 50 89 50 S 69.82 W 2.42 3308.52S 3733.66W 4964.62 S 70.28 W 1.57 3319.33S 3763.45W 4995.08 S 72.25 W 6.35 3329.33S 3792.93W 5024.82 S 70.45 W 5.78 3339.32S 3822.54W 5054.67 S 70.01 W 1.39 3350.03S 3852.31W 5085.06 11849 9020.49 8952.64 11881 9020.32 8952.47 11912 9019.71 8951.87 11944 9018.94 8951.09 11975 9018.30 8950.45 9O 0 90 36 91 37 91 8 91 11 S 70.94 W 2.99 3360.54S 3881.96W 5115.24 S 71.27 W 2.15 3371.00S 3912.51W 5146.11 S 71.09 W 3.34 3381.01S 3941.91W 5175.79 S 72.00 W 3.23 3391.15S 3972.28W 5206.33 S 71.59 W 1.31 3401.01S 4002.24W 5236.38 12007 9017.27 8949.42 12039 9016.31 8948.46 12072 9014.98 8947.13 12104 9012.69 8944.84 12135 9009.68 8941.83 92 34 S 71.48 W 4.44 3410.87S 4031.78W 5266.09 90 51 S 71.65 W 5.41 3420.96S 4062.05W 5296.52 93 40 S 72.48 W 8.74 3431.31S 4094.03W 5328.49 94 39 S 75.78 W 10.93 3439.88S 4124.18W 5357.94 96 26 S 73.91 W 8.29 3447.98S 4154.08W 5386.91 12165 9006.42 8938.57 12197 9004.63 8936.78 12229 9004.81 8936.96 12260 9005.64 8937.79 12292 9006.05 8938.20 95 44 9O 46 88 35 88 24 9O 5 S 73.44 W 2.77 S 74.45 W 16.04 S 74.87 W 7.04 S 73.80 W 3.44 S 73.06 W 5.84 3456 · 55S 4183 . 33W 5415 . 62 3465 . 27S 4213 . 65W 5445 . 29 3473.61S 4244.05W 5474. 80 3482 . 14S 4274 . 47W 5504 . 44 3491 . 15S 4304 . 75W.,~-~5534 . 25 SF~RY-SlIN DRILLING SERVICES ANCHORAGE ALASKA PAGE SIIARED SERVICES DRILLING PBU/G-21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/9 DATE OF SURVEY: 110195 MWD SURVEY JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 12324 9006.00 8938.15 90 5 S 73.78 W 2.25 3500.27S 4335.39W 5564.41 12356 9006.08 8938.23 89 37 S 72.78 W 3.44 3509.47S 4366.01W 5594.61 12387 9006.34 8938.49 89 25 S 73.34 W 1.88 3518.73S 4396.42W 5624.67 12419 9006.63 8938.78 89 32 S 73.69 W 1.16 3527.77S 4426.97W 5654.71 12451 9006.83 8938.98 89 45 S 74.87 W 3.76 3536.42S 4457.68W 5684.66 12483 9007.01 8939.16 89 35 S 73.52 W 4.28 3545.07S 4488.24W 5714.48 12515 9007.25 8939.40 89 32 S 74.36 W 2.66 3553.84S 4518.70W 5744.29 12545 9007.69 8939.84 88 46 S 74.34 W 2.56 3561.96S 4547.71W 5772.55 12577 9008.86 8941.01 87 3 S 74.95 W 5.70 3570.44S 4578.58W 5802.52 12612 9010.68 8942.83 86 55 S 74.23 W 2.10 3579.64S 4611.94W 5834.93 12672 9013.89 8946.04 86 55 S 74.23 W .03 3595.92S 4669.59W 5891.17 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5893.70 FEET AT SOUTH 52 DEG. 24 MIN. WEST AT MD = 12672 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 234.08 DEG. Sr~-~-'~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G- 21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110195 JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -67.85 .00 N .00 E 1000 999.08 931.23 1.49 S 35.07 W 2000 1992.54 1924.69 62.67 S 126.06 W 3000 2987.69 2919.84 94.00 S 208.46 W 4000 3986.89 3919.04 111.79 S 224.42 W .00 .92 .92 7.46 6.55 12.31 4.84 13.11 .80 4341 4327.00 4259.15 138.47 S 238.14 W 5341 5280.64 5212.79 364.01 S 414.35 W 6341 6087.08 6019.23 834.27 S 767.54 W 7341 6857.62 6789.77 1340.92 S 1154.17 W 8341 7614.22 7546.37 1838.01 S 1577.44 W 14.53 1.43 60.89 46.36 254.45 193.56 483.91 229.46 727.31 243.39 9341 8385.09 8317.24 2335.91 S 1970.73 W 10341 9032.20 8964.35 2858.20 S 2472.74 W 11341 9013.18 8945.33 3191.93 S 3403.56 W 12341 9005.99 8938.14 3505.14 S 4352.03 W 12672 9013.89 8946.04 3595.92 S 4669.59 W 956.44 229.14 1309.33 352.89 2328.35 1019.02 3335.54 1007.19 3658.11 322.56 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPerRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE S}{ARED SERVICES DRILLING PBU/G-21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110195 JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE MEASD VERTICAL DEPTH DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0 .00 67 67.85 167 167.85 267 267.85 367 367.85 -67.85 .00 N .00 E .00 .00 .00 N .00 E .00 .00 100.00 .20 S .11 W .00 .00 200.00 .47 S .57 W .00 .00 300.00 .53 S 2.76 W .03 .02 467 467.85 568 567.85 668 667.85 768 767.85 868 867.85 400.00 .56 S 5.70 W .07 500.00 .71 S 9.83 W .16 600.00 .74 S 14.81 W .28 700.00 .78 S 20.37 W .44 800.00 .82 S 25.88 W .59 .04 .09 .12 .15 .15 968 967.85 1069 1067.85 1169 1167.85 1269 1267.85 1370 1367.85 900.00 1.25 S 32.62 W .82 1000.00 2.19 S 40.68 W 1.15 1100.00 4.41 S 48.77 W 1.50 1200.00 8.25 S 56.20 W 1.85 1300.00 12.51 S 63.62 W 2.22 .23 .33 .35 .35 .37 1470 1467.85 1571 1567.85 1671 1667.85 1772 1767.85 1873 1867.85 1400.00 17.65 S 72.23 W 2.72 1500.00 24.18 S 80.94 W 3.31 1600.00 31.75 S 90.61 W 4.07 1700.00 41.30 S 101.48 W 5.11 1800.00 50.67 S 112.28 W 6.13 .50 .59 .75 1.04 1.02 1975 1967.85 2075 2067.85 2176 2167.85 2277 2267.85 2378 2367.85 1900.00 60.39 S 123.30 W 7.20 2000.00 67.38 S 134.87 W 8.13 2100.00 71.51 S 146.27 W 8.87 2200.00 73.67 S 158.29 W 9.62 2300.00 77.58 S 171.00 W 10.51 1.07 .92 .75 .75 .89 2479 2467.85 2579 2567.85 2679 2667.85 2780 2767.85 2880 2867.85 2400.00 83.35 S 181.68 W 11.25 2500.00 88.03 S 190.00 W 11.72 2600.00 90.69 S 197.24 W 12.02 2700.00 92.72 S 203.04 W 12.21 2800.00 93.89 S 206.65 W 12.29 .75 .47 .30 .19 .08 2980 2967.85 3080 3067.85 3180 3167.85 3280 3267.85 3380 3367.85 2900.00 94.02 S 208.24 W 12.31 3000.00 93.75 S 209.12 W 12.31 3100.00 93.45 S 210.10 W 12.32 3200.00 93.19 S 210.94 W 12.32 3300.00 92.91 S 211.77 W 12.32 .02 .01 .00 .00 .00 3480 3467.85 3580 3567.85 3680 3667.85 3780 3767.85 3880 3867.85 3400.00 92.58 S 212.66 W 12.33 3500.00 92.21 S 214.02 W 12.34 3600.00 92.86 S 216.84 W 12.40 3700.00 96.89 S 220.58 W 12.56 3800.00 103.40 S 222.91 W 12.80 .00 .01 .06 .16 .24 S?~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA. PAGE SHARED SERVICES DRILLING PBU/G-21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110195 JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3980 3967.85 4081 4067.85 4181 4167.85 4281 4267.85 3900.00 4000.00 4100.00 4200.00 110.44 S 224.22 W 116.83 S 225.62 W 124.40 S 228.62 W 132.82 S 233.85 W 13.06 .26 13.28 .22 13.61 .34 14.11 .49 4341 4327.00 4382 4367.85 4484 4467.85 4585 4567.85 4259.15 4300.00 4400.00 4500.00 138.48 S 238.14 W 142.91 S 241.61 W 155.39 S 251.25 W 170.85 S 262.91 W 14.53 .43 14.92 .39 16.15 1.24 18.02 1.86 4688 4667.85 4792 4767.85 4896 4867.85 5002 4967.85 5108 5067.85 4600.00 189.58 S 277.70 W 4700.00 211.79 S 294.71 W 4800.00 235.33 S 313.51 W 4900.00 262.03 S 334.05 W 5000.00 290.31 S 355.80 W 20.83 2.82 24.68 3.84 29.13 4.46 34.66 5.53 40.84 6.18 5216 5167.85 5327 5267.85 5442 5367.85 5559 5467.85 5679 5567.85 5100.00 322.22 S 380.56 W 5200.00 358.81 S 410.14 W 5300.00 403.05 S 445.58 W 5400.00 451.90 S 484.44 W 5500.00 502.92 S 524.52 W 48.71 7.87 59.25 10.54 74.21 14.97 92.10 17.89 111.31 19.22 5802 5667.85 5929 5767.85 6058 5867.85 6187 5967.85 6316 6067.85 5600.00 560.43 S 567.47 W 5700.00 624.06 S 613.85 W 5800.00 690.08 S 662.03 W 5900.00 756.39 S 710.15 W 6000.00 821.91 S 758.16 W 134.43 23.11 161.71 27.29 190.86 29.15 220.15 29.28 248.97 28.83 6445 6167.85 6574 6267.85 6704 6367.85 6834 6467.85 6964 6567.85 6100.00 885.97 S 806.78 W 6200.00 951.51 S 855.66 W 6300.00 1017.62 S 905.95 W 6400.00 1083.86 S 956.97 W 6500.00 1149.63 S 1008.03 W 277.30 28.33 306.48 29.18 336.47 30.00 366.82 30.35 396.95 30.12 7094 6667.85 7225 6767.85 7354 6867.85 7483 6967.85 7613 7067.85 6600.00 6700.00 6800.00 6900.00 700O.OO 1215.94 S 1058.50 W 1282.61 S 1108.63 W 1347.52 S 1159.29 W 1411.83 S 1208.80 W 1475.79 S 1260.84 W 427.13 30.18 457.35 30.22 486.89 29.54 515.68 28.79 545.31 29.63 7743 7167.85 7874 7267.85 8007 7367.85 8143 7467.85 8278 7567.85 7100.00 7200.00 7300.00 7400.00 7500.00 1538.20 S 1315.99 W 1599.30 S 1374.44 W 1663.88 S 1434.79 W 1733.30 S 1495.40 W 1804.69 S 1551.31 W 575.45 30.14 606.41 30.96 639.89 33.48 675.89 36.00 710.88 34.99 SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/G- 21PB1 500292260470 NORTH SLOPE BOROUGH COMPUTATION DATE: 11/ 9/95 DATE OF SURVEY: 110195 JOB NUMBER: AK-MW-50097 KELLY BUSHING ELEV. = 67.85 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8414 7667.85 7600.00 1876.75 S 1607.38 W 746.30 35.42 8548 7767.85 7700.00 1948.93 S 1661.91 W 781.15 34.85 8683 7867.85 7800.00 2020.38 S 1715.66 W 815.29 34.14 8816 7967.85 7900.00 2091.15 S 1768.64 W 848.77 33.48 8949 8067.85 8000.00 2161.05 S 1821.57 W 881.77 33.00 9073 8167.85 8100.00 2219.38 S 1865.87 W 905.77 24.00 9196 8267.85 8200.00 2273.73 S 1913.45 W 929.14 23.37 9320 8367.85 8300.00 2326.70 S 1962.12 W 952.32 23.18 9445 8467.85 8400.00 2381.29 S 2014.04 W 977.54 25.22 9575 8567.85 8500.00 2440.76 S 2071.60 W 1007.35 29.81 9707 8667.85 8600.00 2504.39 S 2131.17 W 1040.02 32.67 9841 8767.85 8700.00 2568.31 S 2191.55 W 1073.18 33.16 9972 8867.85 8800.00 2630.83 S 2250.39 W 1104.98 31.81 10126 8967.85 8900.00 2714.39 S 2330.49 W 1158.42 53.44 12672 9013.89 8946.04 3595.92 S 4669.59 W 3658.11 2499.68 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS 10 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE .AK, 99501. Date: 30 November 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. 1 PLS FINAL BL+RF Run # 1 3901.05 1 PLS FINAL BL+RF Run # 1 3983.02 1 CCL FINAL BL+RF 1 PLS FINAL BL+RF ! CCL FINAL BL+RF 1 CCL FINAL BL+RF 1 CN FINAL BL+RF 1 PLS FINAL BL+RF Run ~ 1 5617.11 Run # 1 5855.04 Run # 1 6163.05 Run # 1 6163.06 Run # 1 6529.00 Run # 1 Run # 1 6533.00 Run # 1 1 CN FINAL BL+RF 1 PLS FINAL BL+RF Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street SU~ ~ _t_ 201 Anchorace, AK Q°~18 "' ..... .~ Or, FAX to (907) 563-7803 "-.-'~ j, U,5'r. , MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David John~ DATE: Chairma~[~%;>~. THRU: Blair Wondzell, ..e¢~ FILE NO: ~,l~p~' P. i. Supervisor FROM: Bobby Foster¢~/,--% SUBJECT: Petroleum Inspector November 3, 1995 AHRIKCCD.doc BOPE Test- Nabors 28E BPX - PBU - G-21 PTD # 95-0154 Prudhoe Bay Field Friday, November 3, 1995: ! traveled this date to BP×'s PBU well G-21 being drilled by Nabors rig 28E and witnessed the weekly BOPE test. As the attached AOGCC BOPE Test Report shows, there were 3 failures all of which were repaired / replaced be fore ! departed the location. The rig was clean and all equipment seemed to be in good working order. The location was clean and there was good access to all areas of the rig. Summary: i witnessed the BOPE test on Nabors rig 28E - test time 4.5 - 4 failures. Attachment: AHRIKCCD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: NABORS Rig No. Operator: BPX Well Name: G-21 Casing Size: 7' Set @ 10,602' Test: Initial Weekly X Other , , DATE: 11/3/95 28E PTD # 95-0154 Rig Ph.# 659-4863/64 Rep.: KIRK WHITE Rig Rep.' DAVE RHODES Location: Sec. 12 T. 11N R. 13E Meridian Urn. , , , . Test MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign OK Dd. Rig OK Hazard Sec. YEs FLOOR SAFETY VALVES: Quan. Pressure Upper Kelly / IBOP 1 I 500/5,000 Lower Kelly / IBOP 1'[ 500/5, 000 Ball Type 1 500/5, 000 Inside BOP .1, 500/5, 000 P/F P F/P P , ,, P BOP STACK: Quan. Annular Preventer 1 Pipe Rams 1 Lower Pipe Rams 1 Blind Rams 1 Choke Ln. Valves f HCR Valves 2 Kill Line Valves 1 Check Valve N lA Test Press. 300/3, 000 500/5,000 500/5, 000 500/5, 000 500/5,000 500/5, 000 500/5, 000 P/F P , , P P P P P P , , MUD SYSTEM: Visual Alarm Trip Tank YES YES Pit Level Indicators YES YES Flow Indicator YES YES Meth Gas Detector YES YES H2S Gas Detector YES YES CHOKE MANIFOLD: No. Valves 15 No. Flanges 38 Manual Chokes 2 Hydraulic Chokes Test Pressure 500/5, 000 500/5, 000 Functioned Functioned P/F P ! ,, P P ACCUMULATOR SYSTEM: System Pressure 3,000 I P Pressure After Closure 1,750 I P 200 psi Attained After Closure 0 minutes 21 System Pressure Attained I minutes 42 Blind Switch Covers: Master:' ~/Es Remote: Nitgn. Btl's: 8 ~2000 Avg. Psig. sec. sec. YES · Equipment will be made within'" ~0 days. Notify the Inspector and follow with Written or Faxed verification to ! Inspeotor North Slope Pagor No 659 3607 or 3687 lthe AOGCC Commission Office at: Fax No. 276-7542 ' - t tf your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 ' I I I I I I I I I I I I I I I I REMARKS: Failures: The lower kelly valve leaked- rep/aced and tested. A pressure re/ease plug leaked on a valve in the choke manifold - rep/aced and te'ste~.~"~'he HCR valve on th oN'Il line leaked - greased, cycled and tested OK. *" Distribution: orig-Well File c - Oper. lRig c - Database c - Trip Rpt File c- Inspector FI-021L (Rev. 12/94) STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: AHRIKCCD.XLS BOBBY D. FOSTER TONY K/VOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 September 28, 1995 Ter~ Jordan Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re~ Prudhoe Bay' Unit G-21 BP Exploration (Alaska), Inc. Permit No: 95-154 Sur. Loc. 2911 ,~ISL, 2368%VEL, Sec. 12, TI IN, RI3E, UM Btmhole Loc. 4353~SL, 2392avVEL, Scc. 14, T11N, RI3E, UM Dear Mr. Jordan: Enclosed is thc approved application for permit to drill the above referenced well. Thc permit to drill docs not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximatcly 24 hours) of thc BOPE test performed before drilling below the surface casing shoe must be given so that a representative of thc Commission may witness thc test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. __ Chairman ~ BY ORDER OF THE COMMISSION dlf/Enclosurcs cc; Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/° encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.OO5 la. Type of work Drill [] Redrill I-Illb. Type of well. Exploratorym Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenCII Service [] Development Gas [] SingleZone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 70 f e et Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchorac/e. Alaska 99519-6612 ADL 028285 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 2911' NSL, 2368' WEL, SEC. 12, T11N, R13E Prudhoe Bay Unit At top of productive interval ~8. Well number Number 5209' NSL, 5052' WEL, SEC. ~13, T11N, R13E G-21 2S100302630-277 At total depth §. Approximate spud date Amount 4353' NSL, 2392' WEL, SEC. 14, T11N, R13E 10/01/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(MBa~dTVD) property line ADL 028280 927 f e e t No Close Approach f e e t 2560 13339' MD / 9020' TVD f e e t 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.O35 (e)(2)) Kickoff depth 800 feet Maximum hole angle 9o o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 35' 35' 115' 115' 260 sx Arcticset (Approx.) 12-1/4" 9-5/8" 40# NT80 BTC 3499' 34' 34' 3533' 3520' 990 sx CS III, 305 'G', 250 CS II 8-1/2" 7" 26# L-80 BTC Mod 9852' 33' 33' 9885' 8795' 8-1/2" 7" 29# L-80 BTC Mod 700' 9885' 8795' 10585' 9020' 330 sx Class 'G' 6" 4-1/2" 12.6# L-80 BTC Mod 2904' 10435' 9018' 13339' 9020' 305 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface : ~ ,, ~ ~,~, Intermediate Production c,,~'D~.~, 2 ¥ 1'~-~0~ Liner Perforation depth: measured A[~S~.s Uil & Gas Cons, C0mmissior, true vertical /:~qchorage 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirementsl-I 21.1Signedhereby certify1~,/jw, that the,,~ ~~°reg°ing is true and correct to the best of my knowledge Date ~J ~--.~ Title Senior Drilling Engineer _,7.1 I Commission Use Only Permit Number IAPI number IApproval date See cover letter /~;>.~-/,"~ ~ 150- ~.2-_ .,~'-.- 2__ ~_--~4::::)~/ I P "'~'~, ~:~- ~ ,.5.,'" for other requirements Conditions of approval Samples required [] Yes ,J~No .Mud log required []Yes [] No -~-'-. Hydrogen sulfide measures ~ Yes [] No Directional survey requirea ~:~ Yes [] No Required working pressureu~u~cu ,-, ~j, ,,--' -~J~'~Eql~;~' []3M; ~5M; []1OM; I-I15M; Other: Approved by David W. Johnston by order of _~,/ ~/~ Commissioner [ne commission Date Form 10-401 Rev. 12-1-85 Submit ii 'cate PROPOSED DRILLING AND COMPLETION PROGRAM WELL G-21 1. MIRU. NU diverter and function test same. 2. Drill 12-1/4" hole. Run and cement 9-5/8" 40# NT-80 BTC casing to surface. o Install blowout prevention equipment consisting of 5,000 psi W.p. pipe rams, blind rams, and annular preventer. Test BOPE to 5,000/250 psi. ° Test 9-5/8" casing to 3,000 psi for 30 minutes. A formation leak-off test will be performed 10' below the 10-3/4" shoe to a minimum of 12.5 ppg EMW. ° Directionally drill 8-1/2" hole & building to horizontal target in Zone 1 of the Sadlerochit @ 10,585' MD/9,020' TVD. TIH w/8-1/2" hole opener if needed. Run 7" 26# NT-80 by 29# NT-80 NSCC casing and cement with Class G cement to 1000' MD above the top of the Sag River sand @ 9,414' MD. The annulus will be freeze protected with dry crude if not annular injecting. Test casing to 3,500 psi. ° TIH w/6" BHA. PU 3-1/2" DP. Drill 10' of new hole and displace to Xanvis KC1 mud system. Directionally drill the 6" horizontal hole to TD @ i 13,339' MD/9,020' TVD. RIH w/6" hole opener and 7" scraper spaced out to near the bottom of the 7" casing. Circulate horizontal section clean. 7, Run 4-1/2" 12.6# L-80 NSCT solid liner with liner hanger. The liner will be set at TD and lapped +150' inside 7" casing shoe. Cement liner in place with sufficient cement to fill entire liner annulus. Make cleanout run. Test liner and liner lap to 3,500 psi for 30 minutes. Displace Xanvis KC1 mud with filtered seawater. o Run 3-1/2" L-80 tubing with SSSV, GLM's, and 7" x 3-1/2" packer assembly. Circulate corrosion inhibitor into tubing annulus. Set packer and test tubing annulus w/3,500 psi. 9. Set BPV. ND BOPE. 10. Freeze protect well to 2200' TVD through shear valve in top GLM station. Release rig. Drilling Hazards · There are no hydrocarbon-bearing zones found above the Sag River formation @ 9,414' md based on G Pad logs. The Sag River zone is not expected to be abnormally pressured. · A minimum of 9.5 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi trip margin over the expected 9.0 ppg EMW @ 4000' sstvd. · A range of mud weights from 8.9 ppg to 9.0 ppg will be used to drill the Sadlerochit interval after intermediate casing has been set. Well Plan Summary Gas Cons. Oommissioa Anchorage CASING SIZE: 9-5/8" 9-5/8" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CIRC. TEMP: 40°F PREFLUSH: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET 111 ADDITIVES: retarder WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx APPROX. # SACKS: 990 MIX WATER: 10.53 gps THICKENING TIME: > 4 hrs TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx APPROX. # SACKS: 305 MIX WATER: 4.95 gps THICKENING TIME: > 3-1/2 hrs TOP JOB CEMENT TYPE: COLD SET II ADDITIVES: WEIGHT: 14.95 ppg APPROX. # SACKS: 250 YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hrs @ 50°F CENTRALIZER PLACEMENT: 1. Run 1 bow type centralizer per joint for the first 15 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slurry from TD to surface w/100% excess (less the tail slurry volume). 2. Tail slurry volume 305 sx (to cover 500' of casing shoe w/100% excess). 3. Top job volume 250 sx. Well Plan Summary S EP 2 7 Anchorage WEIGHT: 15.8 ppg APPROX. # SACKS: 330 FLUID LOSS: 100 to 150 cc/30 minutes 7" CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 7" CIRC. TEMP: 140°F PREFLUSH: 20 bbls fresh water SPACER: 70 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hfs FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Two 8-1/4" x 7" Turbulators per joint f/TD to 300' MD above top of Sag River. Estimated Interval: 10,585' to 9,114' md - _+ 72 turbolators needed. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm. (See Cement Guidelines for more about displacement rates) Mix all slurries on the fly. CEMENT VOLUME: 1. Tail slurry to 8,414' MDwith 30% excess (1000' above Top Sag) 2. 80' MD 7" 29# capacity for float joints. . . Alaska Oi~ & Gas Cons. 6ommissior~ Anchorage Well Plan Summary CASING SIZE: 4-1/2" 4-1/2" PRODUCTION LINER CEMENT PROGRAM - BJ SERVICES CIRC. TEMP 140° F SPACERS: 20 bbls water 70 bbls MCS-4 Spacer (weighted one ppg over current MW). CEMENT TYPE: Class G ADDITIVES: FL33: 0.25%, BA86-L: 150 ghs, S-400: 0.2% (by vol.) WEIGHT: 15.7 ppg YIELD: 1.17 ft3/sx APPROXIMATE SACKS: 305 FLUID LOSS: <50 cc @ 140° F CD32: 0.6%, FP-6L: 1 ghs, R-I' TBD A2: 0.2%, Gel 0.5%, MIX WATER: 3.58 gps THICKENING TIME: 3 to 4 hrs FREE WATER: 0.0 cc CENTRALIZER PLACEMENT: 1. Two 5-7/8" x 4-1/2" turbolators per joint from TD to 7" casing shoe. Estimated Interval: 13,339 to 10,585' md - +_ 138 turbolators needed. 2. One 5-7/8" x 4-1/2" turbolator per joint in liner lap (none opposite intermediate casing shoe). Estimated Interval: 10,585' to 10,435' md - _+3 turbolators needed. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 5-7 bpm. (See Cement Guidelines for more about displacement rates) Batch mix the tail slurry. CEMENT VOLUME: 1. Open hole (6" x 4-1/2") + 30% excess (adjust if a caliper log is run - caliper + 20%). 2. 80' for 4-1/2" shoe joints. 3. 150' liner lap. 4. 200' of cement on top of the liner in the 7" casing (assume 3-1/2" DP present). gas Cons. G0m,,nissi0n ^nch0ra¢0 Well Plan Summary G-21 Addition to Permit to Drill Request for Annular Injection Disposal' Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: All drilling and completion fluids can be annular injected. Request to have well G-21 for annular pumping. Request to AOGCC for Annular Pumping Approval for G-21: 1. Approval is requested for Annular Pumping into the G-21 9-5/8" x 7" casing annulus. . Aquifers in the Prudhoe Bay Field Western Operating Area (including K Pad) have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #1 as referenced in Area Injection Order #3. There are no domestic or industrial use water wells located within one mile of the project area. 3. The 9-5/8" casing shoe will be set at 3533' MD (3520' TVD) which is below the Permafrost and in shale formations in the Sagavanirtok above the Ugnu Formation. , The burst rating (80%) for the 9-5/8" 40# NT-80 casing is 4,600 psig while the collapse rating (80%) of the 7" 26# L-80 casing is 4,328 psig. The break down pressure of the Ugnu formation is 13.5 ppg equivalent mud weight. The Maximum Allowable Surface Pressure while annular pumping is calculated according to the following equation and is 2845 psi for a 10.0 ppg fluid in this well (Assumes worst case in which 7" casing is filled with gas). MASP = 4328 psig - ((fluid density ppg - 1.9) X 0.052 X 9-5/8" Casing Shoe TVD) 5. A determination has been made that the pumping operation will not endanger the integrity of the well being drilled by the submission of data to AOGCC on 7/24/95 which demonstrates the confining layers, porosity, and permeability of the injection zone. 6. The cement design for this well ensures that annular pumping into hydrocarbon zones will not occur. AREA WELL PREV VOL PERMITTED PERMITTED INJECTED VOL DATES (aBES) (aBES) Prudhoe Bay G-21 0 0 Submitted for 1995 DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS. ~.ncbor~ge }Well Name: IG-21 Well Plan Summary ]Type of Well (producer or injector): ]Producer Surface Location: Target Location: Bottom Hole Location: 2911' FSL 2368' FEL Sec 12 Ti iN R13E 71' FNL 228' FWL Sec 13 TllN R13E (start of horizontal) 927' FNL 2888' FWL Sec 14 TllN R13E (end of horizontal) I AFE Number: 14P0720 I I Rig: I Nabors 28-E I Estimated Start Date: I 10-1-95 I Operating days to complete: 28 IMD: I13,339' I ITVD: 19,020' I I RT-GL 135.1' I KBE-MSL 69.6' IWell Design (conventional,slimhole,etc.) Ultraslimhole Zone 1 Horizontal Formation Markers: Formation Tops MD TVD(RKB) SV3 3543' 3530' Ugnu Sand 4A 4365' 4350' [< ~'~' ~."~ '~ '~ i~} Seabee 6275' 6030' ~.- -- ~ ~" HRZ 7828' 7220' Kingak (LEU) 8175' 7486' $~-P 2 -t' ~r,~ Sag River 9414' 8435' -, ,~,~ 0i! & ~n-q P. nn.q. Commission TSAD 9558' 8545' ~0"~' 'l~nnhara~a Zone 3 9786' 8720' Zone 2C 9884' 8795' CGOC 10042' 8910' Zone lB 10256' 8995' 7" Casing Point 10585' 9020' Target is 14P sand Total Depth 13339' 9020' End Cemented Liner Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MD/TVD O.D. 30" 20" 91.5# H-40 Weld 80' 35'/35' 115'/115' 12-1/4" 9-5/8" 40# NT80 BTC 3499' 34'/34' 3533'/3520' 8-1/2" 7" 26# L-80 BTC 9852' 33'/33' 9885'/8795' Mod 8-1/2" 7" 29# L-80 BTC 700' 9885'/8795' 10585'/9020' Mod 6" 4-1/2" 12.6# L-80 BTC 2904' 1043579018' 1333979020' Mod (solid) Tubing 3-1/2" 9.2# L-80 NSCT 10068' 32'/32' 10100'/8940' Logging Program: I Open Hole Logs: 12-1/4" Hole None 8-1/2" Hole MWD: GR from TSAG to Horizontal Neutron LWD should be picked up at the top of the final build section until the 8-1/2" hole is TD'd. 6" Hole MWD: GR/Resistivity LWD in horizontal section ICased Hole Logs: 7" Casing None Mud Program: V H H G-21 Well Plan Page 2 Date Revised: 9127195 .~ace Mud Properties: 112-1/4'' hole section: SPUD Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 0' 8.5 _ 300 40-60 30-60 50-80 9-10 15-25 3,533' 9.5 100-200 25-50 15-25 25-40 9-10 15-25 Hazards/Concerns No special hazards are expected. Intermediate Mud Properties: ] 8-1/2" hole section to horizontal: LSND Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 3,533' 9.0-9.2 35-40 8-12 3-6 8-10 9.0-9.5 8-12 4,500' > 9.7 40-45 10-12 4-8 8-12 9.0-9.5 6-8 8,000' 9.8 40-45 10-12 4-8 8-12 9-10 < 6 HTHP- 15.0 10,585' 9.8 40-45 10-12 4-8 8-12 9-10 <6 HTHP-15.0 Hazards/Concerns Cretaceous Overpressure expected - plan MW to at least 9.7 ppg. Utilize hi vis sweeps to assist hole cleaning Treat with Boreplate, Baratrol, & Baranex as needed before entering Kingak. Monitor LSYP and increase if problems occur trying to clean the hole. Reduce AP1 fluid loss to <6 cc before drilling Kingak Section. Production Mud Properties: I 6" hole section: Xanvis KCL Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 10,585' 8.9-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 13,339' 8.9-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Hazards/Concerns Lost Circulation still a possibility due to severe overbalance in Sadlerochit. Differential sticking possible with overbalance situation. Perform/report daily checks on KC1 concentrations in Xanvis KC1 system. Lubetex will be included into the initial fluid makeup. Add more lubetex if needed. Directional' · I KOP: 1800' Maximum Hole Angle: 90.0° Tangent Angle 40° Close Approach Wells: None The above listed wells will be secured during the close approach. Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Please ensure that the diverter lengths and specifications on file with the State match what is present at the rig site. Disposal: Cuttings Handling: CC2A SE? 27 i995 Fluid Handling' Annular injection. ~tas¢.a oil & Gas Cons. Commission Anchorage Annular Injection: Verify the list below against Karen Thomas' Report of Approved Wells prior to injection. DO NOT EXCEED 35,000 BBLS IN THE ANNULUS. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED VOL (aBES) (aBES) VVOA G-21 0 0 Submitted with permit VHH G-21 Well Plan Page 3 Date Revised' 9/27/95 ~red Services D~-~lling ~ State Plane: Zc ~ : WOA: G-Pad ~-21 As-built G-21 Wp4 Preliminary oD ~D [nc Az~ ~ N/S 9 5/8 )nl'~m"mlm~$~· 0,00' 0.00° 88 S 189 7 )n 10580 89.83' 851.88' 9080 8981S 2677 4 i/8 )n 13339 90.00' 851.88' 9020 3839 $ 5300 [T=m~e~ N=me TYD NS Et/ Grid X Grmd Y G-StPo[ygon(tonO) 9080 89[7 S 8706 V 655810 $~66300 G--2.1Poly~(lonG~) 9080 37~4 ~ ~2.98 V 65~635 5965440 G-~tEnd(kon~) 90~0 3939 ~ 5300 ~ 6~8635 59653~ PROPOSED BHL 9019.61 13339.39 6544.12 5299.88 D~te PLotted , 9/~6/95 Cme~ted By Checked By Appmoved 3y , g~te ' 9/86/95 11,58 ~ .SO0 HORIZONTAL V/EW (TRUE NORTH) SCALE 1000 ft. / DIVISION SURVEY EEF: RE[AEEAD HALL l BURTON iO0 O0 O0 5000 4000 3000 8000 1000 0 ;00 VERTICAL sc~ 500 ~._/_p~o~ Y~CAL SECT[ON 1~: 500~ 800 lOOO-- 1500~ 1795 1992 2000-- 2500~ 3500-- 3650 4000-- 4249 4350 4500~ 805 I ~ 0,00' 8 0 MD TIE IN 0 ~ 0.00° ~ 800 MD KOP / START OF BUILD 8 1.00'/100 1. oo' E 900 MD t 2.00' · 1000 MD 3.00' ~ t l'O0 MD 4. DO' E 1200 MD 5.00' ~ 1300 ;,ID , 6.00' ~ 1400 MD 7.00' ~ 1500 8. BO' ~ 1600 MD 9.00' ~ 1700 MD lO. 00' ~- lBO0 MD END DF BUILD 85 lO.O0' 8 2000 MD START OF CURVE ~ 1.00'/100 9.00' E 8100 MD 8.00' ~. 8200 MD 7,00' 8 8300 MD 6.00' ~_ 2400 MD ~.00' ! L~O0 ~ 4.00' ~ 8600 I~ 3.00' e 8700 ND 2.00' ~ 8800 MD l. O0' ~ 8900 MD 0.00' 8 3000 MD END OF CL~VE 20~ 847 1.00' ~ 3763 MD 8,00' ~ 3863 lid 3,00' 8 3963 MD 4,00' ~ 4063 ND 5, 00' ~ 4163 MD 6.00' E 4863 MD START OF Ct~VE ~ 8.00'/100 ft B. 03' 8 4365 MD UG4A 10,00' E 4463 MD 18.00' ~ 4563 MD CRITICAL POINT DATA MD Inc Azl, TVD TIE IN 0 0,00' 245.00' 0 KDP/ ~TART BO0 0.00' 845.00' BO0 Df BUILD e 1.00'/100 Fi END OF BUILD 1800 10.00' 845.00' 1795 START DF 2000 10.00' 845.00' 1998 CURVE e l. O0'/lO0 F~ END OF CURVE 3000 0.00' 817.00' 2987 START OF 3663 0,00' 217.00' 3650 CURVE 8 1.0o'/1oo p~ START OF 4263 6.00' 217.00' 4849 CURV~ E 8.00'/100 Ft UG4A 4365 8.03' 817.58' 4350 END OF CURVE 5963 40.00' 819.00' 5791 CH3 6875 40.00' 819.00' 6030 HRZ 7888 40.00' 219,00' 7820 LCU / Top 8175 40,00' 819.00' 7486 Klng~k TJF 8241 40,00' E19,00' 7336 TJE 8410 40.00' 819.00' 7666 TJD 8805 40.00' 219.00' 7968 TJC 9033 40.00' 819.00' 8143 TJB 9812 40,00' 819.00' B5BO ~t:~1~ Rl~er ':)4.14 40.00' 819.00' 84= 945~340.00' E19.00° 8465 Top $~d / 95'58 40.00' 819.00' ~45 Zone 4 / 43 Zone 3 9786 40.00' 819.00' 8780 ~5'34 Zone 8 / 8C 9884*40.00' 819.00' 8795 8583 START DF 9956 40.00' 219.00' 8850 8619 CURVE ~' 14.00'/100 F~ PGOC 10048 51,63' 883.10' 8910 2665 G~s Under'runs 10076 56.88' 884.37' 8930 8685 Zone I / lB 10856 80.97' 889.58' 8995 2797 END OF CURVE 10881 84.44' 830,14' 8998 2814 START OF 10485 84.44' 230.14' 9018 8905 CUP. YE ! 14,00'/100 ~ Eh~3 OF CURVE 10585 90.00' 851.88' 9080 8988 G-818nd(long~ 13339 90.00' 851.88' 9080 3839 N/S EJV ON OE ON OE 37 $ 79 ¥ 5l S 110 w ~ S 189 w 88 s 189 w 113 S 208 w 183 s 816 w 684 S 618 w 780 S 744 w 11536 s 1378 w 1789 S 16t8 v 1768 1.846 2043 8157 8247 9348~ 8367 8480 5000 -- 5500 -- 5791 6500-- 7000-- 7220 9400 t4.00' e 4663 MD 16.00' e 4763 ND IB.O0' e_. 4863 MD PO.O0' E 4963 ~sz.oo' e 5063 MD 86.00' E 5863 MD ~ 30,00' E 5463 ~ 4,00' E ~63 MD ~0.00' E ~3 MD END OF CURVE D ~094 _~0.00' , 8~,o .~ 8630 ~ / Zone 4 / 4~ ~ I /400 ~SSB ~ ;t / / / ~0.00' ~OO~o%~ ~ .', ,,', fl ~ 3~ 3681 3764 ~1 . bOBS, Anchofago 1539 w 1607 w 1767 w 1859 w 1938 v 8014 w 8078 w -500 0 500 1000 1S00 2000 I/tCI~ISCAL SECTION PIANO: 234.08 2164 2204 8833 8873 8898 8414 8433 8543 8688 5300 ;2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 ~oene~ 8 / 8C · T OUR . 4.00',100 ! / ~6.88' ! 10076 MD O~s / / 80.97' I 10856 MD Zone I / lB · / / 84 44' ~ 10EBI MD END OF ~ C , / ~4 44' E 104~5 MD ~T~RT DF~ ~ /~////~0'00' ~ i0585 MD END DF C~ 90.00' ~ [3339 ~D G-~lEnd([ong; ~544 7 In OD, ~ [0580 MD. 90~0 TWO 4 I/~ In OD, ~ 13339 MD, 90~0 · v,"LL PERMIT CHECKLIST PROGRAM: exp [] dev~ redrll [] aery [] FIELD & POOL GEO~ ~ ~~ ON/OFF SHORE ADMINISTRATION 1. 2. 3. 4. 5. 6. ~ 7. 8. 9. 12. Permit feeattached. ................. ..IY~ N Lease number appropriate ................ IY I N Unique well name and number ......... ...... ~Y ~ N Well located in a defined pool ............. [Y I N Well located proper distance from drl9 unit boundary.. ~Y I N Well located proper distance from other wells ...... IY I N Sufficient acreage available in drilling unit ...... If deviated, is wellbore plat included ........ ~ Y ~ Operator only affected party. ~ N Operator has appropriate bond in force ........ N Permit can be issued without conservation order .... N Permit can be issued without administrative approval. N Can permit be approved before 15-day wait ....... ENGINEERING 14. Conductor string provided ............... ~ N 15. Surface casin9 protects all known USDWs'. ....... ~ N 16. CMT vol adequate to circulate on conductor & surf csg. ~ N 17. CM~ vol adequate to tie-in lon9 string to surf csg . . ./~.'Y ~ 18. CMT will cover all known productive horizons ...... .~ N 19. Casing designs adequate for C, T,' B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............ .~Y~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved.~ 22. Adequate wellbore separation proposed ......... .~ N 23. If diverter required, is it adequate .......... i~ N 24. Drilling fluid program schematic & equip list adequate N 25. BOPEs adequate .................... N 26. BOPE press rating adequate; test to psig.( N 27. Choke manifold complies w/AP1 RP-53 (May 84) ...... ~ 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of E2S 9as probable . . .~ ......... ~ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overp~essure zones ..... Y 32. Seismic analysis gf shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ 34. Contact name/phone for weekly progress reports . . . ~/. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: O HOW/jo - A:',FORM$~cheldist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ****************************** . ....... SCHLUMBERGER ....... . ............................ ****************************** COMPANY NAM~ : BP EXPLORATION (ALASKA) WELL NAME : G-21 FIELD NAM~ : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API~ER : 500292260400 REFERENCE NO : 98522 LM g RECEIVED ~,~ C;on,~. Commission Anchorage LIS Tape Ve~_ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/10/29 ORIGIN · FLIC REEL NAME : 98522 CONTINUATION # : PREVIOUS REEL : CO~4ENT : BP EXPLORATION, PRUDHOE BAY, G-21, API #50-029-22604-00 **** TAPE HEADER **** SERVICE NAM~ : EDIT DATE : 98/10/29 ORIGIN : FLIC TAPE NAME : 98522 CONTINUATION # : 1 PREVIOUS TAPE : COMPiENT : BP EXPLORATION, PRUDHOE BAY, G-21, API #50-029-22604-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NA~E: G-21 API NUMBER: 500292260400 OPERATOR: BP EXPLORATION (ALASKA) LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 29-0CT-98 JOB NUMBER: 98522 LOGGING ENGINEER: R HERRMANN OPERATOR WITNESS: D WENDT SURFACE LOCATION SECTION: 12 TOWNSHIP: 1 IN RANGE: 13E FNL: FSL: 2911 FEL: 2368 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 70. O0 DERRICK FLOOR: 68. O0 GROUND LEVEL: 34.50 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape ~ =fication Listing Schlumberger Alaska Computing Center BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: PPWD LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 07-NOV-95 LOGGING COMPANY: SPERRY SUN BASELINE DEPTH 88888 0 13225 5 13216 5 13171 0 13045 5 13045 0 13031.0 13029.5 12993.0 12973.0 12972.0 12937.5 12916.5 12916.0 12901.5 12888.5 12887.5 12881.0 12853.5 12833.0 12823.0 12808.5 12801.5 12801.0 12770.5 12755.0 12698.0 12681.5 12655.0 12634.0 12625.0 12614.5 12594.5 12557.5 12546.5 12518.0 12491.0 12490.5 12487.0 12468.0 12467.0 12460.0 12454.0 12426.0 12425.0 29-0CT-1998 15:02 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD 88894.5 88891.5 13229.0 13221.5 13177.5 13052.0 13036.0 12996.5 12978.0 12943.5 12921.5 12908.5 12894.0 12826.5 12805.5 12774.5 12757.5 12684.0 12628.0 12617.5 12549.0 12519.5 12493.5 12471.0 12465.0 12458.5 12431.5 13052.0 13036.0 12996.5 12978.0 12943.5 12923.5 12908.0 12893.5 12886.0 12857.5 12835.5 12826.5 12814.0 12805.5 12774.5 12757.5 12701.0 12684.0 12658.5 12637.5 12628.0 12618.0 12596.0 12560.0 12549.0 12519.5 12493.5 12490.0 12471.0 12465.0 12458.5 12431.5 PAGE: LIS Tape Ve~_.cation Listing Schlumberger Alaska Computing Center 12407.5 12394.0 12372.5 12372 0 12369 5 12368 0 12343 0 12333 5 12321 0 12307 0 12306 5 12292.0 12291.5 12287.5 12283.5 12276.5 12275.0 12268.0 12262.5 12233.5 12229.5 12218.5 12200.5 12182.0 12173.5 12159.5 12148.0 12147.0 12122.5 12122.0 12107.5 12106.5 12093.5 12093.0 12082.0 12081.5 12064.0 12057.5 12051.5 12044.0 12043.5 12040.0 12039.5 12032.0 12031.0 12029.0 12028.5 12017.5 12005.5 12000.0 11997.0 11978.0 11971.5 11971.0 11959.5 11953.0 12413.5 12377.0 12374.5 12325.5 12311.5 12296.0 12291.5 12288.5 12279.5 12271.0 12266.0 12236.0 12162.5 12151.5 12126.0 12112.0 12095.5 12085.0 12064.5 12060.0 12053.5 12047.5 12042.5 12037.0 12034.5 12022.5 12009.5 12005.0 12001.5 11983.5 11976.5 11965.5 11958.5 12413.5 12401.0 12377.0 12374.5 12346.5 12336.5 12325.5 12311.0 12296.0 12291.5 12288.5 12280.0 12271.0 12266.0 12236.0 12231.0 12220.0 12204.0 12185.0 12178.5 12162.5 12151.5 12126.0 12112.0 12095.5 12085.0 12064.5 12060.0 12053.5 12048.0 12042.5 12037.0 12034.5 12022.5 12009.5 12005.0 12001.5 11984.0 11976.5 11965.5 11958.5 29-0CT-1998 15:02 PAGE: LIS Tape Ve~__.cation Listing Schlumberger Alaska Computing Center 11949.5 11948.0 11941.5 11940.5 11939.0 11932.0 11909.0 11904.0 11903.5 11899.5 11899.0 11884.5 11884.0 11871.5 11871.0 11824.0 11823.5 11798.0 11787.0 11786.0 11777.0 11776.5 11769.5 11768.5 11750.0 11715.5 11641.5 11610.5 11599.0 11566.5 11563.5 11546.0 11530.5 11503 5 11490 0 11487 5 11473 0 11471 5 11466 5 11463.5 11463.0 11460.0 11455.5 11448.5 11446.5 11439.0 11437.0 11434.0 11433.5 11429.0 11425.0 11423.0 11422.5 11419.0 11418.0 11414.0 11953.5 11944.5 11935.5 11912.5 11907.5 11904.0 11887.5 11872.5 11826.0 11799.5 11789.0 11778.5 11770.5 11752.0 11714.0 11640.0 11610.0 11597.0 11566.5 11562.0 11532.5 11488.0 11472.5 11466.0 11463.0 11448.0 11436.5 11433.5 11424.5 11418.5 11953.5 11945.0 11941.0 11935.5 11912.5 11908.0 11904.0 11887.5 11872.5 11826.0 11799.5 11789.0 11778.5 11770.5 11752.0 11714.0 11640.0 11610.0 11597.0 11566.5 11562.0 11545.0 11532.5 11503.0 11488.0 11472.5 11466.0 11463.0 11459.5 11455.0 11448.0 11436.5 11433.5 11427.0 11424.5 11423.0 11418.5 11414.5 29-0CT-1998 15:02 PAGE: LIS Tape Ve~__.cation Listing Schlumberger Alaska Computing Center 11411.5 11392.5 11392.0 11373.0 11362.5 11357.0 11348.5 11347.5 11344.0 11334.0 11329.5 11313.5 11302.0 11285.0 11284.0 11260.0 11258.0 11255.0 11253.0 11252.5 11250.5 11177.5 11175.0 11160.0 11159.0 11153.0 11151.5 11143 0 11133 5 11117 5 11104 0 11083 5 11083 0 11074 5 11073 5 11068 5 11068 0 11046.5 11046.0 11025.0 11024.5 11018.5 11006.5 11005.5 10974.0 10973.5 10942.5 10932.5 10927.0 10920.5 10920.0 10911.5 10899.5 10899.0 10895.5 10895.0 11411.5 11395.0 11395.0 11373.5 11373.5 11364.0 11364.0 11358.0 11358.0 11348.5 11348.5 11343.5 11343.5 11332.0 11332.0 11328.5 11328.5 11310.5 11310.5 11299.5 11283.5 11283.5 11258.0 11258.0 11250.5 11250.5 11247.0 11249.0 11245.0 11247.0 11175.5 11175.5 11161.5 11153.0 11161.5 11154.0 11145.5 11145.5 11135.0 11135.0 11116.5 11116.5 11104.5 11104.5 11083.0 11083.0 11075.0 11069.0 11045.0 11023.0 11003.0 10971.5 11075.0 11069.0 11045.0 11023.0 11016.5 11003.0 10971.5 10938.5 10938.5 10929.5 10929.5 10926.0 10926.0 10917.0 10917.0 10912.5 10912.5 10897.5 10897.5 10895.5 10895.5 29-0CT-1998 15:02 PAGE: 5 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 10884 10859 10858 10841 10841 10834 10834 0 10806 0 10795 5 10783 5 10782 0 10760 5 10736.5 10723.0 10686.0 10679.0 10672.0 10667.0 10666.5 10658.0 10648.5 10647.5 10640.5 10640.0 10616.5 10600.0 10570.0 10562.0 10557.5 10542.0 10535.5 10525.5 10496.5 10474.0 10473.5 10406.5 10370.5 10326.0 10309.0 10290.0 10289.0 10283.0 10281.5 10271.0 10249.5 10249.0 10224.0 10217.5 10202.5 10197.5 10186.5 100.0 $ .5 10883.0 .0 5 10856.5 5 0 10836.5 5 10829.5 10802.0 10791.0 10779.5 10715.0 10677.0 10672.5 10665.5 10662.0 10655.0 10642.5 10637.0 10612.5 10594.0 10564.0 10557.5 10554.0 10537.0 10532.0 10521.0 10491.5 10469.5 10402.0 10366.5 10327.0 10288.0 10281.0 10270.5 10248.5 10883.0 10856.5 10836.5 10829.5 10802.0 10791.0 10779.5 10754.0 10729.5 10715.0 10677.0 10672.5 10665.5 10662.0 10655.0 10643.0 10637.0 10612.5 10594.0 10564.0 10557.5 10554.0 10537.0 10532.0 10521.0 10491.5 10469.5 10402.0 10366.5 10327.0 10308.0 10288.0 10281.0 10270.5 10248.5 10220.5 10220.5 10215.0 10215.0 10198.5 10198.5 10194.0 10194.0 10181.0 10181.0 94.0 94.0 29-0CT-1998 15:02 CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE MCNL DATA AQUIRED ON BP EXPLORATION'S G-21 WELL. THE DEPTH PAGE: LIS Tape Ver~_=cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE MWD GAMPL~ RAY, ALSO PASS #1 NRAT AND THE MWD GAM~iA RAY, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. PER AN E-MAIL WITH THE FIELD ENGINEER, PASS #2 GR AND PASS #1 GR ARE THE SAME CURVE LOGGED ON PASS #2. NOT ALL SHIFTS ARE DISPLAYED SINCE THEIR NUMBER EXCEEDS THE BUFFER SIZE OF THE LISTING PROGRAM. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMF2FT : 0.5000 FILE SU~9~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 13066.5 9780.0 MCNL 13249.5 9780.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH MCNL REMARKS: THIS FILE CONTAINS CASED HOLE MCNL PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE LIS Tape Ver~_=cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 FCNTCNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 13249.500 NRAT. CNT 15.257 DEPT. 9780.000 NRAT. CNT 10.749 GRCH. CNT -999.250 NCNT. CNT 6102.668 FCNT. CNT GR CH. CNT - 5.013 NCNT. CNT 4616.587 FCNT. CNT 334.384 307.116 ** END OF DATA ** LIS Tape Ver~_=cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE . FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFiBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE S~?4MARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 13050.5 9784.0 MCNL 13057.0 9785.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUM~ER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH MCNL 88888.0 88894.5 88895.0 13029.5 13036.0 13036.5 13023.0 13030.0 13020.5 13028.0 12993.0 12996.5 12973.5 12981.5 12973.0 12978.0 12968.5 12975.0 12965.0 12971.0 12958.5 12964.5 12951.5 12958.0 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 10 12946.5 12953.0 12937.5 12943.5 12932.0 12937.5 12916.5 12921.5 12908.5 12916.5 12901.5 12908.5 12887.5 12894.0 12873.0 12881.0 12868.0 12872.5 12853.0 12860.5 12840.5 12849.0 12834.0 12841.5 12823.0 12826.5 12806.0 12814.0 12801.5 12805.5 12789.0 12796.0 12770.5 12774.5 12767.5 12772.5 12764.0 12770.5 12755.0 12757.5 12742.0 12750.0 12733.0 12739.5 12711.0 12717.0 12705.5 12712.0 12691.5 12697.0 12681.5 12684.0 12680.0 12685.5 12658.0 12663.5 12625.0 12628.0 12616.0 12621.0 12614 . 5 12617.5 12609.5 12616.0 12598.5 12605.0 12596.5 12602.0 12554.5 12560.0 12546.5 12549.0 12518.0 12519.5 12512.0 12517.5 12499.0 12506.5 12490.5 12493.5 12468.0 12471.0 12462.5 12471.0 12460.0 12465.0 12457.0 12464.5 12454.0 12458.5 12444.5 12452.0 12426.5 12436.0 12426.0 12431.5 12407.5 12413.5 12378.5 12386.0 12372.0 12377.0 12368.0 12374.5 12367.5 12374.5 12349.5 12357.5 12335.5 12342.0 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 11 12321.0 12317.5 12307.0 12291.5 12287.5 12283.5 12275.0 12268.0 12262.5 12262.0 12238.5 12233.5 12219.5 12215.5 12209.5 12188.0 12171.0 12159.5 12148.0 12143.5 12131.0 12122.0 12119.0 12111.5 12107 5 12105 5 12097 0 12093 0 12082 0 12077 0 12070.5 12064.0 12057.5 12052.0 12051.5 12047.5 12043.5 12040.0 12036.5 12032.0 12029.0 12017.5 12011.0 12005.5 12000 0 11997 0 11978 0 11971 5 11959 5 11958 0 11953.0 11949.5 11940.5 11937.0 11932.0 12325.5 12311.5 12296.0 12291.5 12288.5 12279.5 12271.0 12266.0 12236.0 12162.5 12151.5 12126.0 12112.0 12095.5 12085.0 12064.5 12060.0 12053.5 12047.5 12042.5 12037.0 12034.5 12022.5 12009.5 12005.0 12001.5 11983.5 11976.5 11965.5 11958.5 11953.5 11944.5 11935.5 12323.0 12268.0 12243.5 12224.0 12220.0 12214.5 12195.5 12178.5 12151.0 12137.0 12126.0 12119.0 12114.0 12102.5 12082.0 12074.0 12056.0 12052.0 12039.0 12012.0 11958.5 11941.0 LIS Tape Ve~__.cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 12 11927.5 11934.5 11926.0 11932.0 11909.0 11912.5 11904.0 11910.0 11903.5 11907.5 11899.0 11904.0 11906.5 11886.0 11891.5 11884.5 11887.5 11871.5 11875.0 11871.0 11872.5 11854.0 11858.0 11849.5 11853.0 11845.5 11850.0 11835.5 11841.5 11825.0 11830.5 11824.0 11826.0 11810.5 11814.0 11798.0 11799.5 11794.0 11795.0 11787.0 11789.0 11777.0 11778.5 11769.5 11770.5 11750.0 11752.0 11744.5 11741.0 11719.5 11720.0 11715.5 11714.0 11715.0 11716.5 11695.5 11696.5 11685.5 11688.5 11679.0 11680.5 11665.0 11665.5 11654.5 11654.5 11652.5 11651.5 11646.0 11643.5 11641.5 11640.0 11640.5 11640.0 11635.5 11634.0 11610.5 11610.0 11599.0 11597.0 11578.5 11577.0 11566.5 11566.5 11563.5 11562.0 11549.5 11548.5 11531.5 11530.5 11530.5 11532.5 11508.0 11507.5 11490.0 11488.0 11488.5 11489.0 11485.5 11487.5 11471.5 11472.5 11466.5 11466.0 11463.0 11463.0 11461.0 11462.5 11457.5 11459.5 11453.5 11455.5 LIS Tape Ve~__.cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 13 11449.5 11451.0 11446.5 11448.0 11442.0 11443.0 11437.0 11436.5 11436.5 11433.5 11433.5 11431.5 11432.0 11426.5 11427.0 11423.0 11424.5 11420.5 11422.5 11418.0 11418.5 11401.0 11401.5 11393.0 11394.5 11392.0 11395.0 11373.0 11373.5 11371.5 11374.0 11362.5 11364.0 11357.0 11358.0 11350.0 11353.0 11347.5 11348.5 11344.5 11346.0 11344.0 11343.5 11338.5 11339.5 11336.0 11337.5 11334.0 11332.0 11329.5 11328.5 11320.5 11316.0 11313.5 11310.5 11312.5 11310.0 11303.0 11303.0 11298.5 11299.5 11290.5 11293.5 11285.0 11283.5 11282.5 11284.0 11279.0 11282.5 11272.5 11272.0 11261.5 11261.0 11260.0 11258.0 11258.0 11250.5 11253.0 11247.0 11250.5 11250.5 11245.0 11249.0 11247.0 11247.0 11237.0 11235.5 11220.0 11218.0 11210.0 11209.5 11206.0 11204.5 11199.5 11196.0 11196.5 11195.0 11175.0 11175.5 11172.5 11173.5 11160.0 11161.5 11159.0 11161.5 11155.5 11158.5 11153.0 11154.0 11151.5 11153.0 11143.0 11145.5 LIS Tape Ve~___ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 14 11133.5 11129 0 11121 5 11117 5 11113 5 11108 0 11104 0 11103 5 11090 0 11086 5 11083 0 11073.5 11068.5 11068.0 11064.0 11051.0 11046.5 11040.0 11031.0 11028.5 11024.5 11009.5 11006.5 10991.0 10987.0 10974.0 10967.5 10960.0 10950.0 10942.5 10938.0 10932.5 10932.0 10927.0 10920.0 10918.5 10911.5 10907.5 10899.0 10898 5 10895 5 10892 5 10884 5 10875 5 10863 5 10858.5 10852.5 10846.0 10841.0 10834.0 10829.5 10806.0 10804.5 10801.0 10795.5 11135.0 11116.5 11104.5 11083.0 11075.0 11069.0 11045.0 11023.0 11003.0 10971.5 10938.5 10929.5 10926.0 10917.0 10912.5 10897.5 10895.5 10883.0 10856.5 10836.5 10829.5 10802.0 10791.0 11130.5 11122.0 11115.0 11108.5 11105.0 11093.0 11088.0 11070.5 11066.0 11052.0 11042.5 11031.5 11027.5 11008.5 10992.5 10986.0 10967.0 10959.0 10947.0 10934.5 10931.0 10917.5 10908.5 10898.5 10894.5 10885.0 10874.0 10863.5 10850.5 10844.0 10827.0 10802.0 10798.0 LIS Tape Ve~__,cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 15 10785.0 10783.5 10775.5 10770.0 10762.0 10759.0 10748.5 10742.0 10732.5 10727.0 10723.5 10723.0 10715.0 10698.5 10686.0 10679.0 10677.5 10672.0 10666.5 10658.0 10647.5 10640.5 10626.0 10619.0 10616.5 10603 0 10600 5 10600 0 10582 5 10572 5 10570 0 10565 0 10562 0 10557.5 10552.0 ! 0542.0 10535.5 10532.0 10525.5 10521.0 10505.5 10500.5 10496.5 10484.0 10476.5 10474.0 10473.5 10471.0 10463.0 100.0 $ 10779.5 10715.0 10677.0 10672.5 10665.5 10662.0 10655.0 10642.5 10637.0 10612.5 10594.0 10564.0 10557.5 10554.0 10537.0 10532.0 10521.0 10491.5 10469.5 94.0 10783.0 10773.5 10767.5 10759.0 10755.5 10743.5 10737.5 10729.0 10720.5 10718.0 10708.5 10694.0 10673.0 10622.5 10617.0 10600.5 10596.5 10580.5 10570.5 10560.5 10547.5 10526.0 10518.0 10502.5 10498.0 10478.0 10473.0 10469.5 10467.5 10460.0 95.0 THIS FILE CONTAINS CASED HOLE MCNL PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO N-RAT PASS #2 AND NRAT LIS Tape Ve~__~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 16 PASS #1, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 13057.000 NRAT. CNT 17.142 DEPT. 9784.000 NRAT. CNT -999.250 GRCH. CNT -999.250 NCNT. CNT 5947.778 FCNT. CNT GRCH. CNT -2.684 NCNT. CNT -999.250 FCNT. CNT 314.152 -999.250 LIS Tape Ve~__.cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 17 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE H~ER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUFk~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12729.5 9792.0 MCNL 12742.5 9792.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUM~ER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH MCNL 88888.0 88887.5 88893.5 12724.5 12724.0 12721 . 0 12726.5 12703.0 12707.5 12698.0 12697.0 LIS Tape Ve~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 18 12690 0 12668 5 12659 0 12644 5 12644 0 12632 0 12623 0 12600 5 12596 0 12574.5 12561.0 12554.5 12545.5 12531.5 12521.0 12516.5 12507.0 12506.0 12493.0 12483.0 12466.0 12458.5 12458.0 12455.0 12444.0 12436.5 12430.0 12426.0 12422.5 12419.0 12414.0 12412.0 12411.5 12391.5 12383.0 12369.0 12362.0 12333.0 12320.5 12306.5 12289.0 12287.0 12283.0 12279.5 12272.0 12264.5 12241.0 12233.0 12228.0 12225.0 12222.5 12221.5 12217.0 12216.0 12206.5 12660.0 12644.0 12631.0 12620.5 12600.0 12562.0 12519.5 12507.5 12486.5 12458.5 12454.5 12442.5 12436.5 12430.0 12419.5 12413.5 12393.5 12384.5 12362.5 12304.5 12286.5 12271.0 12234.5 12230.5 12223.0 12217.0 12207.0 12694.0 12672.0 12648.0 12600.0 12579.0 12560.0 12550.0 12535.5 12521.0 12511.5 12497.5 12488.0 12471.0 12465.0 12436.0 12431.0 12427.5 12417.5 12416.5 12374.0 12337.0 12325.5 12292.0 12289.0 12285.0 12269.5 12247.0 12230.0 12224.5 12220.0 LIS Tape Ve~_=cation Listing Schlumberger Alaska Computing Center 29-0CT~1998 15:02 PAGE: 19 12200.5 12178.0 12164.0 12159.5 12152.5 12151 0 12138 0 12125 5 12112 0 12093 0 12080 0 12051 0 12048 0 12047 5 12037 5 11974.0 11957.5 11951.0 11948.0 11945.5 11936.0 11926.0 11924.0 11913.5 11911.5 11904.0 11892.0 11886.0 11870.0 11868.5 11860.0 11856.5 11849.5 11848.5 11841.0 11840.5 11829.5 11819.5 11798.5 11783.5 11780.5 11772.5 11765 0 11764 0 11749 0 11733 0 11724 5 11721 0 11716.0 11711.0 11707.5 11700.0 11691.5 11660.0 11644.5 12202.0 12180.5 12162.0 12154.5 12141.0 12096.0 12080.0 12054.0 12051.0 12042.0 11952.0 11949.0 11939.5 11926.5 11916.5 11908.0 11887.5 11870.5 11860.5 11851.5 11842.0 11819.5 11783.5 11776.5 11768.0 11752.5 11735.0 11727.5 11692.0 12163.0 12151.5 12126.0 12112.0 12052.5 11976.5 11959.0 11951.5 11922.0 11909.0 11891.5 11870.5 11856.5 11850.0 11843.0 11831.0 11798.0 11783.5 11763.5 11720.0 11716.0 11711.0 11706.0 11697.0 11659.0 11642.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 2O 11634.0 11633.5 11613.5 11595.5 11592.5 11577.5 11568.0 11560.5 11555.5 11535.0 11534.0 11532.5 11517.5 11504.0 11498.5 11491.5 11489.0 11472.0 11467.5 11463.0 11460.0 11453.0 11450.0 11447.5 11443.0 11439.0 11434.0 11433.0 11432.0 11427.5 11426.5 11423 5 11410 0 11397 5 11393 5 11391 5 11372 5 11370 5 11357 5 11354 0 11349 5 11347 0 11344.5 11339.0 11332.0 11318.5 11314.5 11306.0 11302.0 11297.0 11293.5 11282.0 11277.0 11275.5 11271.0 11636.0 11597.0 11569.0 11559.5 11554.5 11534.5 11532.5 11498.5 11491.0 11472.0 11463.0 11461.0 11454.5 11447.5 11440.0 11433.5 11426.5 11399.5 11393.0 11371.0 11358.5 11348.5 11344.0 11332.0 11316.5 11303.5 11292.0 11281.0 11275.0 11267.5 11631.0 11611.5 11591.0 11577.0 11532.5 11515.5 11503.0 11487.5 11469.0 11454.5 11450.5 11443.0 11434.5 11432.5 11427.5 11424.5 11411.5 11395.0 11374.5 11357.5 11353.0 11339.5 11315.5 11303.0 11297.0 11277.5 LIS Tape Ve~_~ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 21 11270.0 11271.0 11261.0 11258.5 11253.0 11250.5 11251.0 11249.5 11249.0 11239.5 11238.5 11238.0 11236.0 11237.5 11233.5 11231.0 11227.5 11226.5 11225.0 11221.5 11218.0 11216.5 11213.5 11200.5 11201.0 11198.0 11199.0 11189.0 11189.0 11184.5 11186.0 11181.0 11175.5 11175.5 11176.0 11166.5 11161.5 11163.0 11161.5 11135.0 11131.5 11112.5 11109.0 11083.0 11078.5 11076.5 11070.0 11076.0 11074.5 11069.5 11066.0 11052.0 11050.0 11048.0 11045.0 11010.5 11007.0 11009.5 11008.5 10989.5 10985.5 10987.5 10986.0 10968.5 10965.5 10951.0 10948.0 10950.5 10947.5 10940.0 10938.0 10938.0 10937.0 10932.5 10930.5 10926.5 10925.0 10919.5 10917.5 10918.5 10916.0 10903.5 10901.0 10886.0 10885.5 10884.5 10883.0 10884.0 10883.0 10881.0 10878.5 10879.5 10879.5 10866.0 10865.0 10862.0 10861.0 10852.0 10850.5 10850.5 10848.0 10841.0 10837.0 10840.0 10836.5 10829.5 10827.0 10820.5 10819.0 10819.5 10817.0 LIS Tape Ve~_£ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 22 10816.0 10810.0 10804 0 10801 5 10797 5 10795 5 10790 5 10785 5 10782 5 10781 5 10770 5 10750.0 10743.5 10742.0 10724.5 10713.0 10709.5 10687.5 10678.5 10678.0 10669.0 10661.5 10645.0 10644.0 10619.0 10615.5 10603.0 10601.0 10578.0 10554.5 10548.0 10542.0 10541.5 10524.5 10521.5 10514.0 10506.5 10496.5 10484.0 10470 5 10459 5 10457 0 10454 5 10450 5 10440 0 10403 5 10401 0 10396.0 10394.5 10383.0 10369.5 10362.0 10348.0 10330.5 10315.0 10799.5 10791.0 10786.0 10779.5 10765.0 10744.0 10738.0 10707.5 10672.5 10662.0 10637.0 10607.5 10594.0 10534.0 10499.0 10464.0 10445.0 10399.5 10392.0 10389.5 10378.0 10367.0 10345.5 10315.0 10814.5 10809.5 10802.5 10798.0 10792.0 10782.5 10779.5 10767.5 10738.0 10720.5 10705.0 10684.0 10673.0 10658.0 10643.5 10617. 0 10599.0 10574.5 10552.0 10545.5 10538.0 10522.0 10518.0 10509.5 10493.0 10479.0 10456.0 10452.5 10449.5 10434.0 10395.5 10360.0 10328.5 LIS Tape Vel~=ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 23 10310.5 10308.5 10305.0 10300.0 10293 0 10288 5 10285 0 10284 0 10277 0 10274 0 10265 0 10252 0 10216 5 10201 0 10191 0 10170 5 10168 0 10163.0 10160.5 10154.5 10150.0 10132.0 10125.5 10113.0 10106.5 10101.0 10094.5 10084.5 10079.5 10075.0 10072.0 10070.0 10068.5 10064.5 10059.0 10056.5 10053.0 10047.5 10038.5 10038.0 10036.5 10028.0 10024 0 10017 0 10010 0 10006 0 10004 5 9997 5 9968 5 9960.5 9955.0 9949.0 9940.5 9936.0 9931.5 10311.0 10304.0 10300.0 10288.0 10284.5 10277.5 10273.0 10216.0 10165.0 10163.0 10158.5 10148.5 10126.5 10106.5 10102.5 10092.0 10081.0 10075.0 10069.0 10064.5 10052.5 10041.0 10032.0 10024.0 10019.5 10011.5 10005.5 10000.5 9993.0 9955.0 9934.5 9926.5 10308.0 10292.5 10284.0 10266.0 10252.5 10202.5 10190.0 10160.0 10148.0 10129.0 10121.0 10098.5 10068.5 10064.5 10061.0 10054.0 10046.5 10034.5 10031.5 10000.0 '9964.0 9955.5 9951.5 9945.0 9931.0 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 24 9930.0 9926.0 9924.0 9920.0 9912.0 9907.5 9902.0 9897.5 9898.0 9894.5 9880.0 9874.5 100.0 94.0 94.0 $ REMARKS: THIS FILE CONTAINS CASED HOLE MCNL BORAX PASS #i. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH BORAX PASS #1 AND GRCH PASS #1, ALSO NRAT BORAX PASS #1 AND NRAT PASS #1, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID DEPT GRCH CNT NCNT CNT FCNT CNT NRAT CNT ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) FT O0 000 O0 0 3 1 1 4 68 0000000000 GAPI O0 000 O0 0 3 1 1 4 68 0000000000 CPS O0 000 O0 0 3 1 1 4 68 0000000000 CPS O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 $ 1 1 4 68 0000000000 LIS Tape Ve~ .~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 25 * * DATA * * DEPT. 12742. 500 GRCH. CArT -999. 250 NCNT. CNT 3375. 798 FCNT. CNT NRA T. CiPT 22.3 63 DEPT. 9792.000 GRCH. CNT 7.074 NCNT. CNT 5180.471 FCNT. CNT NRA T. CNT 8. 859 146. 784 359.946 ** END OF DATA ** **** FILE TRAILER **** FILE NAIVE : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA2~E : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCRE~F2Tr: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12644.5 9804.5 MCNL 12652.0 9804.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH LIS Tape Ve~_~ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 26 PASS NUMBER: 1 BASELINE DEPTH 88888.0 12633.0 12624.0 1261 O. 5 12606.0 12599 0 12593 0 12578 0 12573 5 12569 5 12567 0 12554 0 12533 0 12530 5 12520 5 12512 5 12492.5 12490.5 12485.5 12483.5 12475.5 12468.5 12464.0 12442.0 12433.5 12411.0 12407.0 12401.5 12398.5 12390.0 12358.0 12354.0 12348.5 12348.0 12342.5 12295.5 12284.0 12280.5 12266.0 12263.5 12235 5 12232 0 12220 0 12217 0 12209 0 12207 5 12200 5 12199 5 12178.0 12177.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH MCNL 88892.5 88893.0 12638.0 12628.5 12570.5 12556.5 12536.5 12517.5 12494.5 12487.0 12470.5 12465.5 12443.0 12435.0 12413.5 12394.0 12350.5 12288.5 12266.0 12234.5 12209.0 12207.0 12202.5 12180.0 12616.0 12610.5 12605.0 12599.0 12582.5 12578.5 12575.0 12536.0 12524.5 12497.5 12490.0 12479.0 12410.5 12405.5 12401.5 12362.5 12357.5 12353.5 12346.5 12302.5 12285.5 12271.0 12239.5 12224.5 12219.5 12205.5 12185.0 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 27 12165.0 12159.0 12144.5 12138.5 12127.0 12107.5 12106.0 12104.5 12095.0 12088.5 12051.0 12048.0 12046.5 12038.5 12036.5 12001.5 11974 0 11962 5 11947 5 11942 5 11938 5 11931 5 11927 0 11925 5 11923.0 11914.5 11906.5 11906.0 11893.0 11882.5 11868.5 11863.0 11861.5 11846.0 11841.0 11838.5 11825.5 11824.0 11820.5 11802.0 11800.0 11791.0 11787.5 11775.5 11765.5 11764.0 11755.5 11734.5 11733.5 11715.5 11706.0 11696.0 11691.0 11672.5 11666.0 12169.0 12162.5 12144.0 12130.5 12112.0 12108.0 12094.5 12051.0 12042.0 12003.5 11976.5 11952.0 11942.0 11935.5 11907.5 11885.0 11870.5 11861.5 11842.0 11826.5 11788.0 11776.5 11766.5 11734.0 11706.5 11692.0 11673.0 12151.5 12133.5 12114.0 12112.0 12102.5 12056.0 12052.5 12041.0 12007.0 11969.0 11949.0 11934.0 11931.5 11929.0 11919.5 11910.0 11898.0 11867.0 11850.0 11843.5 11830.5 11824.5 11806.0 11803.5 11795.0 11770.5 11759.5 11738.0 11716.5 11697.0 11666.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 28 11645.5 11639.5 11635.0 11615.5 11595.0 11575.5 11573.5 11550.5 11549.5 11548.0 11545.0 11535.5 11516.0 11504.5 11501.5 11468.0 11460.5 11452.5 11451.0 11447.0 11434.0 11433.0 11430.0 11427.5 11423.5 11422.5 11420.0 11410.5 11409.0 11406.5 11393.5 11378.5 11375.0 11373.5 11360 5 11358 5 11347 5 11347 0 11345 0 11343 5 11341 5 11336 5 11331 5 11317 0 11302.5 11294.0 11287.0 11286.0 11277.0 11274.0 11267.5 11262.0 11260.5 11253.0 11251.0 11617.0 11597.0 11574.0 11551.0 11537.5 11506.0 11461.0 11450.5 11433.5 11430.0 11424.0 11420.5 11412.0 11395.0 11380.0 11373.5 11358.0 11347.5 11343.5 11331.0 11291.5 11283.5 11267.0 11258.5 11250.5 11249.5 11645.5 11640.5 11634.5 11577.0 11551.5 11548.5 11545.0 11515.5 11502.0 11469.5 11454.5 11448.0 11434.5 11431.5 11427.0 11424.5 11411.5 11409.0 11377.5 11362.0 11348.5 11345.5 11341.5 11337.5 11316.5 11303.0 11287.0 11277.5 11273.5 11262.0 11250.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 29 11250.5 11238.0 11230.5 11221.0 11220.0 11175.0 11173.0 11172.0 11153.0 11144.0 11140.0 11124.5 11121.0 11114.0 11108.0 11107.5 11106 0 11095 5 11082 5 11082 0 11077 5 11076 0 11062,5 11049.5 11041.0 11030.5 11028.0 11022.5 11015.0 11011.5 11010.0 10987.0 10985.5 10968.0 10967.0 10952.0 10937.0 10933.0 10926.0 10921.5 10918.0 10898.5 10894.5 10885.0 10883.5 10878.0 10870.5 10862.0 10850.0 10840.5 10838.0 10831.5 10829.0 10826.5 10821.0 11237.5 11220.0 11176.5 11174.0 11153.0 11145.5 11121.5 11107.0 11096.0 11082.5 11075.0 11038.5 11021.0 11009.0 10984.0 10965.5 10937.0 10925.5 10916.0 10895.5 10882.5 10869.0 10836.5 10833.0 10827.0 11249.0 11236.0 11227.5 11217.5 11174.0 11154.0 11142.0 11127.5 11116.5 11109.0 11107.0 11083.5 11078.5 11063.0 11051.0 11031.5 11027.5 11016.0 11011.5 10986.5 10966.5 10951.0 10931.0 10921.0 10894.0 10885.0 10877.5 10861.0 10848.0 10827.0 10825.0 10819.0 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 3O 10817.5 10795.5 10795.0 10790.5 10782.5 10780.5 10771.0 10760.0 10752.5 10730.5 10720.5 10709.0 10700.0 10694.0 10688.0 10685.0 10679.0 10661.0 10622.0 10610.5 10606.0 10599.0 10598.5 10583.0 10576.0 10567.0 10564 0 10561 5 10554 5 10551 5 10514 5 10507 5 10502 5 10500 5 10455 5 10446.5 10440.5 10429.5 10399.0 10396.0 10395.5 10388.5 10377.5 10364.0 10354.0 10346.5 10341.0 10334.5 10332.0 10330.5 10328.5 10326.0 10311.0 10304.5 10303.5 10790.5 10779.5 10776.5 10767.0 10752.0 10717.5 10694.0 10687.0 10677.5 10673.0 10607.0 10594.0 10562.5 10558.0 10499.0 10447.0 10428.5 10396.5 10392.0 10384.0 10373.5 10345.0 10329.5 10327.0 10311.0 10304.5 10815.0 10792.5 10787.0 10767.5 10759.5 10729.5 10708.5 10686.5 10658.0 10617.0 10601.0 10595.0 10579.0 10570.5 10560.0 10552.0 10548.0 10510.0 10502.0 10498.0 10450.0 10437.5 10392.5 10362.5 10352.5 10340.0 10332.5 10329.0 10323.0 10302.0 LIS Tape VeL _~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 31 10291.5 10289 5 10289 0 10284 5 10284 0 10277 0 10254 0 10250 5 10238 0 10221 5 10221 0 10208 0 10206 5 10192 0 10175 5 10171 0 10163 5 10162 5 10147.0 10145.0 10140.0 10131.5 10129.5 10126.0 10125.0 10120.5 10112.0 10111.5 10101.5 10090.5 10068.5 10060.0 10059.0 10046.5 10024.0 10004.5 9977.0 9968.5 9966.0 9963.0 9960.0 9955.5 9952.0 9946.0 9935.5 9934.0 9928.0 9927.5 9918.0 9917.0 9906.5 9902.0 9898.5 9897.5 9890.5 10292.5 10288.0 10284.5 10277.5 10248.5 10237.5 10217.5 10203.5 10165.0 10158.5 10135.0 10120.5 10106.5 10055.0 10019.5 9964.0 9960.5 9958.0 9946.0 9926.5 9919.5 991 O. 5 9885.0 10287.5 10283.5 10252.5 10217.0 10203.0 10189.5 10173.5 10160.0 10143.5 10140.5 10128.5 10126.0 10120.5 10115.5 10109.0 10098.5 10087.5 10064.5 10054.0 10041.5 10000.5 9971.0 9963.5 9955.0 9951.5 9943.0 9931.5 9925.5 9916.0 9903.0 9899.0 9894.5 9892.5 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 32 9883.5 9879.5 9840.0 9836.5 9832.5 9828.0 9823.0 9818.5 9819.5 9813.5 100.0 94.5 94.0 $ REMARKS: THIS FILE CONTAINS CASED HOLE MCNL BORAX PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCHBORAXPASS #2AND GRCH PASS #1, ALSO NRAT BORAX PASS #2 AND NRAT PASS #1, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 4 1 1 4 68 0000000000 NCNTCNT CPS O0 000 O0 0 4 1 1 4 68 0000000000 FCNTCNT CPS O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CArT O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 33 * * DA TA * * DEPT. 12652.000 GRCH. CNT -999.250 NCNT. CNT 3207.037 FCNT. CNT NRAT. CNT 21.293 DEPT. 9804.000 GRCH. CNT -999.250 NCNT. CNT 4208.930 FCNT. CNT NRAT. CNT 7.998 156. 603 300.310 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENO?4~ER: 5 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NOW~ER: 5 DEPTH INCREMENT: 0.5000 FILE SUAg~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12623.0 9784.5 MCNL 12628.0 9785.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH LIS Tape Ve~__ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 34 PASS NUMBER: 1 BASELINE DEPTH 88888.0 12600.0 12599.0 12595.5 12559.5 12553.0 12523.5 12523.0 12516.0 12506.5 12500.5 12484.0 12480.5 12474.5 12463.5 12457.0 12433.0 12430.5 12419.5 12415.5 12412.5 12411.0 12386.5 12370.0 12365.5 12344.5 12319.5 12287.0 12264.5 12261.5 12237.0 12232.0 12209.0 12205.5 12199.5 12188.5 12177.5 12177.0 12157.0 12144 5 12132 0 12125 0 12123 5 12107 0 12104 5 12071 0 12061 5 12048 0 12047.5 12008.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH MCNL .............. 88891.0 88889.0 12603.0 12600.0 12556.5 12528.5 12519.5 12504.5 12483.5 12476.5 12463.5 12458.0 12434.5 12433.0 12419.5 12415.5 12413.0 12410.0 12384.5 12368.5 12363.0 12288.5 12267.5 12239.0 12234.5 12206.5 12202.5 12180.0 12148.0 12136.5 12112.0 12064.5 12051.0 12600.0 12559.5 12526.0 12508.5 12490.0 12349.5 12325.5 12268.0 12218.0 12197.0 12185.0 12162.0 12132.5 12129.5 12112.5 12074.5 12052.5 12007.0 LIS Tape Ve~_~ication Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 35 11952.5 11948.0 11941.0 1193 6.5 11936.0 11924.5 11912.5 11904.0 11901.5 11896.5 11871.0 11870.5 11861.0 11856.0 11849.5 11840.5 11826.0 11811 0 11799 0 11797 5 11775 0 11773 0 11761 0 11751 5 11736 5 11720 0 11715 5 11706 5 11680 5 11665.0 11619.0 11613.0 11600.0 11593.5 11542.5 11535.0 11522.5 11489.5 11486.5 11475.0 11473.0 11460.0 11454.5 11453.5 11450.0 11446.5 11441.0 11430.0 11423.0 11409.5 11405.0 11403.0 11392.5 11388.5 11377.5 11952.0 11945.0 11939.5 11928.5 11907.5 11898.5 11872.5 11863.0 11856.5 11826.5 11811.0 11799.0 11774.5 11752.0 11705.0 11679.5 11617.0 11596.5 11540.5 11532.5 11519.0 11487.5 11474.0 11472.5 11461.0 11455.5 11451.5 11443.0 11430.5 11424.5 11407.5 11390.5 11959.0 11941.0 11919.5 11907.5 11874.5 11853.0 11843.5 11795.0 11770.0 11760.0 11737.5 11720. 0 11716.5 11665.5 11612. 0 11591. 0 11485.5 11455.0 11448.5 11430.5 11424.5 11411.5 11405.5 11394.0 11377.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 36 11369.0 11347.5 11347.0 11344.5 11338.5 11316.5 11307.5 11295.5 11286.5 11286.0 11273 5 11263 5 11260 5 11257 5 11255 0 11253 5 11251 5 11250 5 11246 5 11238 0 11237 5 11218 5 11199 0 11177 0 11176 0 11163 0 11153 0 11143 5 11124 5 11106 0 11084 0 11078 0 11076 0 11064 5 11064.0 11061.5 11051.0 11041.0 11032.0 11025.0 11014.5 11014.0 11009.0 10998.0 10979.0 10967.5 10964.0 10953.5 10952.5 10939.5 10932.5 10919.0 10895.0 10886.0 10862.0 11371.0 11348.0 11343.0 11284.0 11262.0 11258.5 11250.5 11249.5 11243.5 11237.0 11215.0 11176.0 11161.5 11142.0 11123.5 11061.0 11039.0 11029.5 11023.5 11013.0 10978.0 10965.5 10952.0 10938.5 10916.0 11348.0 11339.5 11316.5 11305.0 11293.5 11287.0 11273.5 11257.5 11252.5 11249.0 11236.0 11196.5 11176.0 11154.0 11106.5 11084.5 11078.5 11074.5 11065.5 11063.0 11052.5 11016.0 11011.0 10999.0 10963.5 10950.5 10931.0 10894.5 10885.0 10861.0 LIS Tape Vez~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 37 10850.0 10841.0 10833.0 10819.5 10815.5 10808.5 10806.5 10803.0 10795.5 10776.0 10770 0 10757 0 10749 5 10748 0 10737 0 10734 5 10716.5 10714 5 10707 0 10698 5 10685 0 10678 5 10677 0 10667 0 10663 0 10642 0 10624.0 10620.5 10615.0 10603.0 10601.0 10599.5 10579.0 10520.5 10494.0 10484.0 10466.0 10438.5 10396.0 10394.5 10363.5 10347.0 10331.0 10328.0 10309.0 10294.0 10288.5 10284.0 10282.5 10277.0 10267.5 10255.0 10227.5 10221.0 10217.5 10836.5 10827.0 10809.0 10802.5 10796.5 10791.0 10770.0 10765.0 10752.0 10743.5 10740.5 10729.5 10708.0 10705.0 10677.0 10672.0 10662.0 10635.0 10617.0 10609.5 10597.0 10593.5 10574.0 10461.0 10392.0 10390.0 10345.0 10327.5 10287.5 10284.0 10277.5 10266.0 10218.0 10216.0 10848.0 10817.0 10802.5 10792.5 10766.5 10729.5 10701.5 10694.0 10673.0 10658.0 10617.0 10600.0 10519.0 10490.0 10479.5 10437.0 10362.5 10328.5 10308.0 10292.5 10283.5 10252.0 10226.0 LIS Tape Ve~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 38 10205.5 10198.0 10191.5 10185.0 10170.0 10167.5 10147.5 10145.0 10136.0 10134.0 10129.5 10125.0 10123 0 10111 0 10102 0 10095 5 10089 5 10083 5 10078 5 10074 0 10068 5 10065 0 10058 5 10057 5 10046 0 10038 0 10035 0 10027.0 10022.5 10015.0 10006.5 10003.5 9981.5 9975.5 9969.5 9967.5 9963.0 9961.0 9960.0 9958.0 9952.0 9940.5 9935.5 9932.5 9929.0 9918.5 9907.0 9892.0 9886.0 9872.5 9839.5 9837.0 9831.0 9823.5 9819.5 10194.0 10181.0 10165.0 10163.5 10130.5 10129.5 10123.5 10106.5 10074.0 10052.5 10032.0 10024.5 10019.0 10011.5 9998.5 9964.5 9957.0 9955.0 9946.0 9934.0 9926.5 10203.0 10189.5 10143.0 10140.0 10120.5 10118.5 10098.5 10095.0 10087.5 10078.5 10068.5 10064.5 10061.0 10053.5 10041.5 10034.5 10021.0 10004.5 9976.5 9972.0 9963.5 9955.5 9951.0 9931.5 9926.0 9916.0 9903.5 9888.0 9881.0 9868.5 9836.5 9834.5 9825.5 9819.0 9813.5 LIS Tape Vez__~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 39 9814.5 9808.5 9813.5 9808.5 9809.5 9804.0 9802.0 9797.5 9800.0 9794.5 9795.5 100.0 94.5 95.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE MCNL FLUSH PASS #1. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH FLUSH PASS #1 AND GRCH PASS #1, ALSO N-RAT FLUSH PASS #1 AND NRAT PASS #1, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 ~ 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 5 1 1 4 68 0000000000 NCNTCNT CPS O0 000 O0 0 5 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 5 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Vez__~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 4O ** DATA ** DEPT. 12628. 000 NRA T . CNT 22.173 GRCH. CNT -999.250 NCNT. CNT 4536.055 FCNT. CNT DEPT. 9784.500 GRCH. CNT -1.648 NCNT. CNT -999.250 FCNT. CNT NRAT. CN~f -999.250 214.767 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION . O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 6 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, MCNL $ REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES 1 & 2. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. LIS FORMAT DATA LIS Tape Ve~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 41 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA2~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 6 1 1 4 68 0000000000 GRCH CNAV GAPI O0 000 O0 0 6 1 1 4 68 0000000000 CVEL CNAV F/HR O0 000 O0 0 6 1 1 4 68 0000000000 NCNT CNAV CPS O0 000 O0 0 6 1 1 4 68 0000000000 FCNT CNAV CPS O0 000 O0 0 6 1 1 4 68 0000000000 ~T CNAV O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 13066.500 GRCH. CNAV 30.657 CVEL. CNAV -999.250 NCNT. CNAV -999.250 FCNT. CNAV -999.250 NRAT. CNAV -999.250 DEPT. 9780.000 GRCH. CNAV -5.013 CVEL. CNAV -999.250 NCNT. CNAV -999.250 FCNT. CNAV -999.250 NRAT. CNAV -999.250 ** END OF DATA ** LIS Tape Vez~.~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 42 **** FILE TRAILER **** FILE NA~E : EDIT .006 SERVICE : FLIC VERSION .. O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA2~E : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.1000 FILE SU~f~RY VENDOR TOOL CODE START DEPTH MCNL 13265.5 $ LOG HEADER DATA STOP DEPTH 9769.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~VA RAY MCNL ~ORY COMP NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 05-SEP-98 RELOO33A 9786.0 13246.0 TOOL NUMBER GR MCNL LIS Tape Ver_ _cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:0Z PAGE: 43 DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2200 NEAR COUNT RATE LOW SCALE (CPS): 1000 NEAR COUNT RATE HIGH SCALE (CPS): 33500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to PDS PRODUCTION LOG DATED FEB 2, 1996 PUMPED 210 BBL SEAWATER DOWN COIL BEFORE LOGGING BASELINE PASS #1. PUMPED A TOTAL OF 270 BBLS SEAWATER BEFORE LOGGING BASELINE PASS #2. PUMPED A TOTAL OF 300 BBLS SEAWATER BEFORE LOGGING BORAX PASSES. PUMPED 20 BBLS OF BORAX OUT OF COIL BEFORE BORAX1 PUMPED A TOTAL OF 87 BBLS BORAX BEFORE LOGGING BORAX2 PUMPED A TOTAL OF 145 BBLS BORAX OUT OF COIL PUMPED AN ADDITIONAL 20 BBLS SEAWATER FOR FLUSH PASS. 0.5 BPM FLUID WAS PUMPED DURING EACH LOGGING PASS TO MAINTAIN FLUID PACK. THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #1. $ LIS FORMAT DATA LIS Tape Ver~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 44 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SBT TYPE - CHAN ** NA24~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 7 1 1 4 68 0000000000 CVEL PS1 F/P~R O0 000 O0 0 7 1 1 4 68 0000000000 GR PS1 GAPI O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS1 CPS O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS1 CPS O0 000 O0 0 7 1 1 4 68 0000000000 ATRAT PS1 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS1 V O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 13265.500 CVEL.PS1 1.500 GR.PS1 -999.250 RCNT. PS1 RCFT. PS1 -999.250 NRAT. PS1 -999.250 CCL.PS1 -999.250 DEPT. 9769.500 CVEL.PS1 -999.250 GR.PS1 -999.250 RCNT. PS1 RCFT. PS1 -999.250 NRAT. PS1 -999.250 CCL.PS1 85.000 -999.250 -999.250 ** END OF DATA ** LIS Tape Ver~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 45 **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE .. FLIC VERSION · O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE H~ER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION . O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASSNUMBER: 2 DEPTH INCREMENT: 0.1000 FILE SU~94ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 13099.0 9775.5 MCNL $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~ff4A RAY MCNL MEMORY COMP NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 05-SEP-98 RELOO33A 9786.0 13246.0 TOOL IVTJMBER GR MCNL LIS Tape Ver~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 46 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNTRATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2200 NEAR COUNT RATE LOW SCALE (CPS): 1000 NEAR COUNT RATE HIGH SCALE (CPS): 33500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to PDS PRODUCTION LOG DATED FEB 2, 1996 PUMPED 210 BBL SEAWATER DOWN COIL BEFORE LOGGING BASELINE PASS #1. PUMPED A TOTAL OF 270 BBLS SEAWATER BEFORE LOGGING BASELINE PASS #2. PUMPED A TOTAL OF 300 BBLS SEAWATER BEFORE LOGGING BORAX PASSES. PUMPED 20 BBLS OF BORAX OUT OF COIL BEFORE BORAX1 PUMPED A TOTAL OF 87 BBLS BORAX BEFORE LOGGING BORAX2 PUMPED A TOTAL OF 145 BBLS BORAX OUT OF COIL PUMPED AN ADDITIONAL 20 BBLS SEAWATER FOR FLUSH PASS. 0.5 BPM FLUID WAS PUMPED DURING EACH LOGGING PASS TO MAINTAIN FLUID PACK. THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #2. $ LIS FORMAT DATA LIS Tape Ve~__~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 47 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 8 1 1 4 68 0000000000 CVEL PS2 F/HR O0 000 O0 0 8 1 1 4 68 0000000000 GR PS2 GAPI O0 000 O0 0 8 1 1 4 68 0000000000 RCNTPS2 CPS O0 000 O0 0 8 1 1 4 68 0000000000 RCFT PS2 CPS O0 000 O0 0 8 1 1 4 68 0000000000 NRAT PS2 O0 000 O0 0 8 1 1 4 68 0000000000 CCL PS2 V O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 13099.000 CVEL.PS2 -999.250 GR.PS2 -999.250 RCFT. PS2 -999.250 NRAT. PS2 -999.250 CCL.PS2 -999.250 DEPT. 9775.500 CVEL.PS2 -999.250 GR.PS2 -999.250 RCFT. PS2 -999.250 NR~T.PS2 -999.250 CCL.PS2 85.000 RCNT. PS2 RCNT. PS2 -999.250 -999.250 ** END OF DATA ** LIS Tape Ve~__xcation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 48 **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE . FLIC VERSION : 001C01 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAM~ : EDIT .009 SERVICE · FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREFiENT: O . 1000 FILE S~Y VENDOR TOOL CODE START DEPTH MCNL 12780.0 $ LOG HEADER DATA STOP DEPTH 9783.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMFL~ RAY MCNL MEMORY COMP NEUTRON $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): 05-SEP-98 RELOO33A 9786.0 13246.0 TOOL NUMBER ........... GR MCNL LIS Tape VeL _cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 49 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2200 NEAR COUNT RATE LOW SCALE (CPS): 1000 NEAR COUNT RATE HIGH SCALE (CPS): 33500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to PDS PRODUCTION LOG DATED FEB 2, 1996 PUMPED 210 BBL SEAWATER DOWN COIL BEFORE LOGGING BASELINE PASS #1. PUMPED A TOTAL OF 270 BBLS SEAWATER BEFORE LOGGING BASELINE PASS #2. PUMPED A TOTAL OF 300 BBLS SEAWATER BEFORE LOGGING BORAX PASSES. PUMPED 20 BBLS OF BORAX OUT OF COIL BEFORE BORAX1 PUMPED A TOTAL OF 87 BBLS BORAX BEFORE LOGGING BORAX2 PUMPED A TOTAL OF 145 BBLS BORAX OUT OF COIL PUMPED AN ADDITIONAL 20 BBLS SEAWATER FOR FLUSH PASS. 0.5 BPM FLUID WAS PUMPED DURING EACH LOGGING PASS TO MAINTAIN FLUID PACK. THIS FILE CONTAINS THE RAW DATA FOR BORAX PASS #1. $ LIS FORMAT DATA LIS Tape Vel_ ~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 50 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 9 1 1 4 68 0000000000 CVEL BX1 F/HR O0 000 O0 0 9 1 1 4 68 0000000000 GR BX1 GAPI O0 000 O0 0 9 1 1 4 68 0000000000 RCNTBX1 CPS O0 000 O0 0 9 1 1 4 68 0000000000 RCFT BX1 CPS O0 000 O0 0 9 1 1 4 68 0000000000 NRAT BX1 O0 000 O0 0 9 1 1 4 68 0000000000 CCL BX1 V O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 12780.000 CVEL.BX1 -999.250 GR.BX1 -999.250 RCFT.BX1 -999.250 NRAT.BX1 -999.250 CCL.BX1 -999.250 DEPT. 9783.000 CVEL.BX1 -999.250 GR.BX1 -999.250 RCFT. BX1 -999.250 NRAT.BX1 -999.250 CCL.BX1 85.000 RCNT. BX1 RCNT.BX1 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 51 **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION · O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE lVTgY4~ER 10 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 4 DEPTH INCREMENT: 0.1000 FILE S~Y VENDOR TOOL CODE START DEPTH MCNL 12692.5 $ LOG HEADER DATA STOP DEPTH 9789.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~94A RAY MCNL M~4ORY COMP NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 05-SEP-98 RELOO33A 9786.0 13246.0 TOOL NUMBER GR MCNL LIS Tape Verification Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 52 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COtrNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2200 NEAR COUNT RATE LOW SCALE (CPS): 1000 NEAR COUNT RATE HIGH SCALE (CPS): 33500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to PDS PRODUCTION LOG DATED FEB 2, 1996 PUMPED 210 BBL SEAWATER DOWN COIL BEFORE LOGGING BASELINE PASS #1. PUMPED A TOTAL OF 270 BBLS SEAWATER BEFORE LOGGING BASELINE PASS #2. PUMPED A TOTAL OF 300 BBLS SEAWATER BEFORE LOGGING BORAX PASSES. PUMPED 20 BBLS OF BORAX OUT OF COIL BEFORE BORAX1 PUMPED A TOTAL OF 87 BBLS BORAX BEFORE LOGGING BORAX2 PUMPED A TOTAL OF 145 BBLS BORAX OUT OF COIL PUMPED AN ADDITIONAL 20 BBLS SEAWATER FOR FLUSH PASS. 0.5 BPM FLUID WAS PUMPED DURING EACH LOGGING PASS TO MAINTAIN FLUID PACK. THIS FILE CONTAINS THE RAW DATA FOR BORAX PASS #2. $ LIS FORMAT DATA LIS Tape Ver~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 53 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 10 1 1 4 68 0000000000 CVEL BX2 F/HR O0 000 O0 0 10 1 1 4 68 0000000000 GR BX2 GAPI O0 000 O0 0 10 1 1 4 68 0000000000 RCNT BX2 CPS O0 000 O0 0 10 1 1 4 68 0000000000 RCFT BX2 CPS O0 000 O0 0 10 1 1 4 68 0000000000 NRAT BX2 O0 000 O0 0 10 1 1 4 68 0000000000 CCL BX2 V O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** DEPT. 12692.500 CVEL.BX2 -999.250 GR.BX2 -999.250 RCNT.BX2 -999.250 RCFT. BX2 -999.250 NRAT. BX2 -999.250 CCL.BX2 -999.250 DEPT. 9789.000 CVEL.BX2 -999.250 GR.BX2 -999.250 RCNT.BX2 -999.250 RCFT. BX2 -999.250 NRAT. BX2 -999.250 CCL.BX2 85.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 54 **** FILE TRAILER **** FILE NA~E : EDIT .010 SERVICE · FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFiE : EDIT .011 SERVICE · FLIC VERSION : O01CO1 DATE . 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE1VOZ~ER 11 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 5 DEPTH INCREmENT: 0.1000 FILE SU~9~RY VENDOR TOOL CODE START DEPTH STOP DEPTH 12674.5 9775.5 MCNL $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIf4~ LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAF~IA RAY MCNL MEMORY COMP NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 05-SEP-98 RELOO33A 9786.0 13246.0 TOOL NUMBER GR MCNL LIS Tape Ver~=~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 55 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) '. GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2200 NEAR COUNT RATE LOW SCALE (CPS): 1000 NEAR COUNT RATE HIGH SCALE (CPS): 33500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to PDS PRODUCTION LOG DATED FEB 2, 1996 PUMPED 210 BBL SEAWATER DOWN COIL BEFORE LOGGING BASELINE PASS #1. PUMPED A TOTAL OF 270 BBLS SEAWATER BEFORE LOGGING BASELINE PASS #2. PUMPED A TOTAL OF 300 BBLS SEAWATER BEFORE LOGGING BORAX PASSES. PUMPED 20 BBLS OF BORAX OUT OF COIL BEFORE BORAX1 PUMPED A TOTAL OF 87 BBLS BORAX BEFORE LOGGING BORAX2 PUMPED A TOTAL OF 145 BBLS BORAX OUT OF COIL PUMPED AN ADDITIONAL 20 BBLS SEAWATER FOR FLUSH PASS. 0.5 BPM FLUID WAS PUMPED DURING EACH LOGGING PASS TO MAINTAIN FLUID PACK. THIS FILE CONTAINS THE RAW DATA FOR FLUSH PASS #1. $ LIS FORMAT DATA LIS Tape Vez_ ~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 56 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 O. 1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 11 1 1 4 68 0000000000 CVEL FP1 F/HR O0 000 O0 0 11 1 1 4 68 0000000000 GR FP1 GAPI O0 000 O0 0 11 1 1 4 68 0000000000 RCNT FP1 CPS O0 000 O0 0 11 1 1 4 68 0000000000 RCFT FP1 CPS O0 000 O0 0 11 1 1 4 68 0000000000 AFRAT FP1 O0 000 O0 0 11 1 1 4 68 0000000000 CCL FP1 V O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 12674.500 CVEL.FP1 -999.250 GR.FP1 -999.250 RCNT.FP1 RCFT. FP1 -999.250 AFRAT. FP1 -999.250 CCL.FP1 -999.250 -999.250 DEPT. 9775.500 CVEL.FP1 -999.250 GR.FP1 -999.250 RCNT. FP1 -999.250 RCFT. FP1 -999.250 NRAT. FP1 -999.250 CCL.FP1 84.876 ** END OF DATA ** LIS Tape Ver~_~cation Listing Schlumberger Alaska Computing Center 29-0CT-1998 15:02 PAGE: 57 **** FILE TRAILER **** FILE NA~E : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NA~iE : EDIT DATE : 98/i 0/29 ORIGIN : FLIC TAPE NAME : 98522 CONTINUATION # : 1 PREVIOUS TAPE : CO~I~VT : BP EXPLORATION, PRUDHOE BAY, G-21, API #50-029-22604-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/10/29 ORIGIN : FLIC REEL NAME : 98522 CONTINUATION # : PREVIOUS REEL : COF~W~_2VT : BP EXPLORATION, PRUDHOE BAY, G-21, API #50-029-22604-00 Tape Subfile 2 is type: ~IS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 6612.00 E. CRIBBS D. FIELDS G-21 PR1 500292260470 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 15-AUG-96 MWD RUN 7 R. KRELL C. DIXON MWD RUN 8 R. KRELL C. DIXON MWD RUN 9 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD R. KRELL C. DIXON 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE BIT SIZE (IN) 30.000 12.250 8.500 6.000 MWD RUN 10 R. KRELL C. DIXON MWD RUN 11 R. KRELL C. DIXON 12 liN 13E 2911 2368 67.85 AUG 2 1 1996 CASING DRILLERS 9 ?.000 10602.0 12672.0 MWD - GR/EWR4/CNP. ALL DEPTHS ARE MEASURED BIT DEPTHS. RUNS 1-5 ARE DIRECTIONAL ONLY AND NO DATA IS PRESENTED. RUN 6 IS DIRECTIONAL WITH GAMMA RAY (NGP/SGRD). GAMMA RAY DATA FROM 7315' MD TO 9699' MD IS ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTOR, AND IS NOTED AS NGP/SGRD TYPE DATA. GAMMA RAY DATA FROM 9699' MD TO 12625' MD IS ACQUIRED WITH DUAL GAMMA RAY, GEIGER-MUELLER TYPE DETECTORS, AND IS NOTED AS DGR/SGRC TYPE DATA. RUNS 7-9 ARE DIRECTIONAL WITH COMPENSATED NEUTRON POROSITY (CNP/SPSF) AND GAMMA RAY (DGR/SGRC). RUNS 10-11 ARE DIRECTIONAL WITH ELECTROMAGNETIC 4-PHASE WAVE RESISTIVITY (EWR4), AND GAMMA RAY (DGR/SGRC). A MEASUREMENT AFTER DRILLING (MAD) PASS FROM 10602' MD TO 11650' MD IS PRESENTED. A ROTATIN~ MEASUREMENT AFTER DRILLING (MAD) PASS WAS PERFORMED AT THE START OF RUN 7, OVER THE INTERVAL FROM 9672' MD TO 9765' MD, AND IS INCLUDED AS PART OF MWD RUN 7. WELL G-21 PB1 WAS PLUGGED BACK TO CASING AT 10602' MD AFTER BEING DRILLED TO TD AT 12672' MD. WELL G-21 PB1 DATA IS NOT DEPTH SHIFTED. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR NPHI $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 7316.0 12625.0 10581.0 12632.0 9633.0 10566.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD - MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 6 7381.0 9765.0 7 9765.0 9965.0 8 9965.0 10116.0 9 10116.0 10613.0 10 10613.0 11689.0 11 11689.0 12672.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 10 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 GR MWD 68 1 AAPI RPX MWD 68 1 OHMI~ RPS MWD 68 1 OHMM RPM MWD 68 1 OHMM RPD MWD 68 1 OHMM NPHI MWD 68 1 PU-S NCNT MWD 68 1 CPS 4 4 4 4 4 4 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 890 01 1 4 90 334 30 1 8 FCNT MWD 6~ 1 CPS 4 9 FET MWD 68 1 HR 4 10 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 466 4 90 334 31 4 90 180 01 4 90 810 01 40 Tape File Start Depth = 12673.000000 Tape File End Depth = 7315.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 117888 datums Tape Subfile: 2 572 records... Minimum record length: Maximum record length: 62 bytes 1018 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: CN WN FN COUN STAT START DEPTH 10591.0 10591.0 STOP DEPTH 11643.0 11650.0 MAD RUN NO. MAD PASS NO. MERGE TOP 10 1 10116.0 MERGE BASE 10613.0 MAD PASS RUN AFTER MWD RUN 10. $ : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 GAPI 4 2 RPX MAD 68 1 OHMM 4 3 RPS MAD 68 1 OHMM 4 4 RPM MAD 68 1 OHMM 4 5 RPD MAD 68 1 OHMM 4 6 FET MAD 68 1 HR 4 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 60 24 Tape File Start Depth = 11655.000000 Tape File End Depth = 10585.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **~ LIS representation code decoding summary: Rep Code: 68 14988 datums Tape Subfile: 3 84 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7316.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 9699.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 18-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 9765.0 7381.0 9765.0 0 35.2 42.8 TOOL NUMBER NGP 235 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.80 44.0 9.1 600 4.2 .000 .000 .000 .000 .0 137.5 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 6. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 59 Tape File Start Depth = 9770.000000 Tape File End Depth = 7315.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 132622 datums Tape Subfile: 4 122 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE S~Y VENDOR TOOL CODE START DEPTH GR 9422.0 CNP 9633.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9934.0 9926.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ 19-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 9965.0 9672.0 9965.0 0 40.5 41.5 TOOL NUMBER P0449CRNG6 P0449CRNG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.90 50.0 9.3 600 4.0 .000 .000 .000 .000 .0 142.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 7. $ : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 NCNT MWD 68 1 CPS 4 4 FCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 995 99 1 4 90 940 02 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 27 Tape File Start Depth = 9970.000000 Tape File End Depth = 9415.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 21655 datums Tape Subfile: 5 92 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9926.0 CNP 9919.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT).: BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10075.0 10068.0 20-OCT-95 MSC 1.32 / ISc 2.12 NGP 5.21 / CIM 3.93 MEMORY 10116.0 9965.0 10116.0 0 40.2 48.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ TOOL NUMBER P0449CRNG6 P0449CRNG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.80 46.0 9.3 5OO 4.4 .000 .000 .000 .000 .0 146.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 8.' : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 NCNT MWD 68 1 CPS 4 4 FCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 995 99 1 4 90 940 02 1 4 90 810 01 1 2O * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 10120.000000 Tape File End Depth = 9915.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 135089 datums Tape Subfile: 6 . Minimum record length: Maximum record length: 75 records... 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10077.0 CNP 10070.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP DGR $ STOP DEPTH 10574.0 10566.0 COMPENSATED NEUTRON DUAL GAMMA RAY 21-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 10613.0 10116.0 10613.0 0 51.2 91.6 TOOL NUMBER P0449CRNG6 P0449CRNG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.80 48.0 9.4 5OO 3.8 .000 .000 .000 .000 .0 144.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 CN WN FN COUN STAT MWD RUN 9.- $ : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 2 NPHI MWD 68 1 PU-S 3 NCNT MWD 68 1 CPS 4 FCNT MWD 68 1 CPS 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 4 90 995 99 1 4 4 90 995 99 1 4 4 90 940 02 1 4 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 27 Tape File Start Depth = 10620.000000 Tape File End Depth = 10065.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 28322 datums Tape Subfile: 7 92 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10382.0 EWR4 10388.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11643.0 11650.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 24-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 11689.0 10613.0 11689.0 0 87.2 96.5 TOOL NUMBER P0412SP4 P0412SP4 6.000 10602.0 FLO-PRO 9.00 60.0 8.9 35000 4.6 .120 .040 .090 .130 68.0 189.0 70.0 72.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 10. $ : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 86 Tape File Start Depth = 11695.000000 Tape File End Depth = 10375.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 156218 datums Tape Subfile: 8 151 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 9 is type:-LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10565.0 EWR4 10572.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12625.0 12632.0 26-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 12672.0 11689.0 12672.0 0 86.9 96.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.00 60.0 8.9 35000 4.1 .110 .040 .100 .130 71.0 196.0 71.0 71.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS · · CN WN FN COUN STAT MWD RUN $ : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAP I 2 RPX MWD 68 1 OHMM 3 RPS MWD 68 1 OHMM 4 RPM MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 FET MWD 68 1 HR 7 ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) Total Data Records: 137 998 BYTES * Tape File Start Depth = 12673.000000 Tape File End Depth = 10560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 62139 datums Tape Subfile: 9 202 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 10 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10591.0 EWR4 10591.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11643.0 11650.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 24-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 11689.0 10591.0 11650.0 0 87.2 96.5 TOOL NUMBER P0412SP4 P0412SP4 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY_(S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.00 60.0 8.9 35000 4.6 .120 .040 .090 .130 68.0 189.0 70.0 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : · 0 EWR FREQUENCY (HZ): 0 REMARKS: MAD PASS RUN AFTER MWD RUN 10. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 PB1 : PRUDHOE BAY : NORTH SLOPE .' ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MAD 68 1 GAPI 2 RPX MAD 68 1 OHMM 3 RP S MAD 68 1 OHMM 4 RPM MAD 68 1 OHMM 5 RPD MAD 68 1 OHMM 6 FET MAD 68 1 HR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 60 Tape File Start Depth = 11655.000000 Tape File End Depth = 10585.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 171206 datums Tape Subfile: 10 126 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 11 is type: LIS 96/ 8/14 01 **** REEL TRAILER **** 96/ 8/14 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 14 AUG 96 4:17p Elapsed execution time = 14.22 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 2 is type: ~IS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 6611.00 E. CRIBBS D. FIELDS G-21 500292260400 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 15-AUG- 96 MWD RUN 7 R. KRELL C. DIXON MWD RUN 8 R. KRELL C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 9 R. KRELL C. DIXON MWD RUN 14 R. JACKSON K. WHITE MWD RUN 12 R. KRELL C. DIXON MWD RUN 15 R. JACKSON K. WHITE MWD RUN 13 R. JACKSON K. WHITE MWD RUN 16 R. JACKSON K. WHITE MWD RUN 17 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD R. JACKSON K. WHITE 12 liN 13E 2911 2368 67.85 66.35 34.50 I(]ROF LA ED OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) lST STRING 30.000 20.000 115.0 2ND STRING 12.250 9.625 3509.0 3RD STRING 8.500 7.000 10602.0 PRODUCTION STRING 6.000 13359.0 REMARKS: MWD - GR/EWR4/CNP. ALL DEPTHS ARE MEASURED BIT DEPTHS. RUNS 1-5 ARE DIRECTIONAL ONLY AND NO DATA IS PRESENTED. RUN 6 IS DIRECTIONAL WITH GAMMA RAY (NGP/SGRD). GAMMA RAY DATA FROM 7315' MD TO 9699' MD IS ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECT(~,, AND IS NOTED AS NGP/SGRD TYPE DATA. GAMMA RAY DATA FROM 9699' MD TO 13319' MD IS ACQUIRED WITH DUAL GAMMA RAY, GEIGER-MUELLER TYPE DETECTORS, AND IS NOTED AS DGR/SGRC TYPE DATA. RUNS 7-9 ARE DIRECTIONAL WITH COMPENSATED NEUTRON POROSITY (CNP/SPSF) AND GAMMA RAY (DGR/SGRC). A ROTATING MEASUREMENT AFTER DRILLING (MAD) PASS WAS PERFORMED AT THE START OF RUN 7, OVER THE INTERVAL FROM 9672' MD TO 9765' MD, AND IS INCLUDED AS PART OF MWD RUN 7. RUNS 12-17 ARE DIRECTIONAL WITH ELECTROMAGNETIC 4-PHASE WAVE RESISTIVITY (EWR4) AND GAMMA RAY (DGR/SGRC). THERE ARE 5 SEPARATE MEASURED AFTER DRILLING (MAD) PASSES WHICH COVER THE INTERVAL FROM 10602' MD TO 13329 ' MD. WELL G-21 KICKED-OFF FROM WELL G-21 PB1 AT 10602' MD, PART WAY THROUGH RUN 9. WELL G-21 IS DRILLED TO TD AT 13359' MD. WELL G-21 DATA IS NOT DEPTH SHIFTED. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR NPHI $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 7316.0 13319.0 10586.0 ~ 13326.0 9633.0 10566.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD 6 MWD 7 MWD 8 MWD 9 MWD 12 MWD 13 MWD · 14 MWD 15 MWD 16 MWD 17 $ REMARKS: MERGED MAIN PASS. BIT RUN NO MERGE TOP MERGE BASE 7381.0 9765.0 9765.0 9965.0 9965.0 10116.0 10116.0 10602.0 10602.0 11336.0 11336.0 11444.0 11444.0 12155.0 12155.0 12852.0 12852.0 '13228.0 13228.0 13359.0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 10 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 2 RPX MWD 68 1 3 RPS MWD 68 1 AAPI OHMM OHMM API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 RPM MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 NPHI MWD 68 1 PU-S 7 NCNT MWD 68 1 CPS 8 FCNT MWD 68 1 CPS 9 FET MWD 68 1 HR 10 ROP MWD 68 1 FPHR 4 4 4 4 4 4 4 4O * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 526 4 90 120 46 4 90 120 46 4 90 890 01 4 90 334 30 4 90 334 31 4 90 180 01 4 90 810 01 Tape File Start Depth = 13359.000000 Tape File End Depth = 7315.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 132980 datums Tape Subfile: 2 647 records... _Minimum record length: Maximum record length: 62 bytes 1018 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR $ MERGED DATA SOURCE PBU TOOL CODE MAD MAD MAD MAD $ REMARKS: CN WN FN COUN STAT .5000 START DEPTH 10533.0 10581.0 STOP DEPTH 13319.0 13329.0 MAD RUN NO. MAD PASS NO. 13 1 14 1 15 1 16 1 17 1 MERGE TOP 10533.0 11405.0 12122.0 12823.0 13203.0 MERGE BASE 11405.0 12122.0 12823.0 13203.0 13319.0 MERGED MAD PASS. ABOVE SPLICE DEPTHS ARE FOR GR CURVE. $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH 'SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 2 RPX MAD 68 1 OHMM 3 RPS MAD 68 1 OHMM 4 RPM MAD 68 1 OHMM 5 RPD MAD 68 1 OHMM 6 FET MAD 68 1 HR 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 156 Tape File Start Dem_n = 13335.000000 Tape File End Depth. = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 39278 datums Tape Subfile: 3 185 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7316.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 9699.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 18-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 9765.0 7381.0 9765.0 0 35.2 42.8 TOOL NUMBER NGP 235 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.80 44.0 9.1 600 4.2 .000 .000 .000 .000 .0 137.5 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 6. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 4 90 810 01 1 8 * DATA RECORD -(TYPE# 0) 1014 BYTES * Total Data Records: 59 Tape File Start Depth = 9770.000000 Tape File End Depth = 7315.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 147714 datums Tape Subfile: 4 122 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9422.0 CNP 9633.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9934.0 9926.0 19-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 9965.0 9672.0 9965.0 0 40.5 41.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ TOOL NUMBER P0449CRNG6 P0449CRNG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: ~ LSND 9.90 50.0 9.3 600 4.0 .000 .000 .000 .000 .0 142.0 .0 .0 NEUTRON TOOL MATRIX. ' MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 7. $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 NCNT MWD 68 1 CPS 4 4 FCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 995 99 1 4 90 940 02 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 27 Tape File Start Depth = 9970.000000 Tape File End Depth = 9415.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 45945 datums Tape Subfile: 5 92 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Date__ Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9926.0 CNP 9919.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM):. HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10075.0 10068.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ 20-OCT- 95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 10116.0 9965.0 10116.0 0 40.2 48.0 TOOL NUMBER P0449CRNG6 P0449CRNG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN).: DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.80 46.0 9.3 50O 4.4 .000 .000 .000 .000 .0 146.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 8.- $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 NPHI MWD 68 1 PU-S 4 3 NCNT MWD 68 1 CPS 4 4 FCNT MWD 68 1 CPS 4 5 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 995 99 1 4 90 995 99 1 4 90 940 02 1 4 90 810 01 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 10120.000000 Tape File End Depth = 9915.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 150181 datums Tape Subfile: 6 75 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10077.0 CNP 10070.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10574.0 10566.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ 21-OCT-95 MSC 1.32 / ISC 2.12 NGP 5,21 / CIM 3.93 MEMORY 10613.0 10116.0 10613.0 0 51.2 91.6 TOOL NUMBER P0449CRNG6 P0449CRNG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 3509.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.80 48.0 9.4 5O0 3.8 .000 .000 .000 .000 .0 144.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 9. DATA BELOW KICK-OFF POINT OF 10602' MD IS FROM G-21 PB1 BOREHOLE. $ BP EXPLORATION (ALASKA) G-21 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 .NPHI MWD 68 1 PU-S 3 NCNT MWD 68 1 CPS 4 FCNT MWD 68 1 CPS 5 ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 995 99 1 4 4 90 995 99 1 4 4 90 940 02 1 4 4 90 810 01 1 20 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 27 Tape File Start Depth = 10620.000000 Tape File End Depth = 10065.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 52612 datums Tape Subfile: 7 94 records... Minimum record length-. Maximum record length: 62 bytes 1014 bytes Date Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10533.0 EWR4 10540.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11296.0 11303.0 29-OCT-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 'MEMORY 11336.0 10598.0 11336.0 0 86.7 96.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.10 63.0 9.9 34000 4.3 .100 .040 .100 .130 65.0 151.0 65.0 65.0 NEUTRON TOOL MATRIX. · MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 CN WN FN COUN STAT MWD RUN 12. $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAP I 2 RPX MWD 68 1 OHMM 3 RPS MWD 68 1 OHMM 4 RPM MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 FET MWD 68 1 HR 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 180 01 1 4 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) Total Data Records: 53 998 BYTES * Tape File Start Depth = 11340.000000 Tape File End Depth = 10525.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 163230 datums Tape Subfile: 8 118 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11296.0 EWR4 11296.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) ,MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 $ STOP DEPTH 11404.0 11411.0 ELECTROMAG. RESIS. 4 03-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 11444.0 11336.0 11444.0 0 88.4 94.5 TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.00 57.0 9.5 37000 4.2 .170 .070 .100 .150 68.0 177.0 68.0 67.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 ,000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 13, $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64 ) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 2 RPX MWD 68 1 OHMM 3 RPS MWD 68 1 OHMM 4 RPM MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 FET MWD 68 1 HR 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 180 01 1 4 4 90 810 01 1 28 * DATA RECORD (TYPES 0) 998 BYTES * Total Data Records: 11 Tape File Start Depth = 11450.000000 Tape File End Depth = 11290.000000 Tape File Level Spacing = 0.~500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55181 datums Tape Subfile: 9 76 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 10 is type:-LIS FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files· BIT RUN NO: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11385.0 EWR4 11391.0 $ LOG HEADER DATA DATE LOGGED:- SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12115.0 12122.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 04 -NOV- 95 MSC 1.32 / ISC 2·12 NGP 5·21 / CIM 3·93 MEMORY 12155.0 11444.0 12155.0 0 88.3 94.0 TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.00 68.0 9.5 34000 4.9 .370 · 140 .136 .142 66.0 184.0 66.0 66.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 14. $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHM}{ 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 51 Tape File Start Depth = 12160.000000 Tape File End Depth = 11380.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 175719 datums Tape Subfile: 10 116 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 15 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12109.0 EWR4 12113.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12811.0 12818.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 05-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 12852.0 12155.0 12852.0 0 88.3 94.0 TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.00 68.0 9.5 34000 4.9 .140 · 140 .138 .140 65.0 183.0 65.0 65.0 NEUTRON TOOL MATRIX' · · MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 15, $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE~ 0) 998 BYTES * Total Data Records: 50 Tape File Start Depth = 12860.000000 Tape File End Depth = 12100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 67350 datums Tape Subfile: 11 115 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 12 is type: LIS FILE HEADER FILE NUMBER: 11 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 16 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12809.0 EWR4 12813.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13188.0 13195.0 06-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 13228.0 12852.0 13228.0 0 88.1 90.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.10 66.0 10.0 34000 4.8 .150 .050 .140 .180 65.0 193.0 65.0 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 16~ $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 2 RPX MWD 68 1 3 RPS MWD 68 1 4 RPM MWD .68 1 5 RPD MWD 68 1 6 FET MWD 68 1 7 ROP MWD 68 1 API API API API Log Crv Crv Size Length Typ Typ Cls Mod AAPI 4 OHMM 4 OHMM 4 OHMM 4 OHM 4 HR 4 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) Total Data Records: 29 998 BYTES * Tape File Start Depth = 13235.000000 Tape File End Depth = 12800.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 182688 datums Tape Subfile: 12 94 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 13 is type: LIS FILE HEADER FILE NUMBER: 12 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 17 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13183.0 EWR4 13188.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 $ STOP DEPTH 13319.0 13326.0 ELECTROMAG. RESIS. 4 07-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 13359.0 13228.0 13359.0 0 88.0 90.1 TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.10 66.0 10.5 34000 4.8 · 150 .050 · 140 · 180 65.0 191.0 65.0 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 17. $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 995 BYTES * Total Data Records: 12 Tape File Start Depth = 13359.000000 Tape File End Depth = 13175.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 70303 datums Tape Subfile: 13 77 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 14 is type: LIS FILE HEADER FILE NUMBER: 13 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 13 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10533.0 EWR4 10581.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY-OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMIIMANGLE: STOP DEPTH 11410.0 11417.0 03 -NOV- 95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 11444.0 10533.0 11417.0 0 88.4 94.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.00 57.0 9.5 37000 4.2 · 170 · 070 .100 .150 68.0 177.0 68.0 67.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : . 0 EWR FREQUENCY (HZ): MAD PASS RUN AFTER MWD RUN 13. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 2 RPX MAD 68 1 OHMM 3 RPS MAD 68 1 OHMM 4 RPM MAD 68 1 OHMM 5 RPD MAD 68 1 OHMM 6 FET MAD 68 1 HR 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 50 Tape File Start Depth = 11420.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 195156 datums Tape Subfile: 14 116 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 15 is type:~ LIS FILE HEADER FILE NUMBER: 14 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 14 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11391.0 EWR4 11398.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12122.0 12128.0 04-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 12155.0 11391.0 12128.0 0 88.3 94.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0412SP4 P0412SP4 'BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.00 68.0 9.5 34000 4.9 .370 · 140 .136 · 142 66.0 184.0 66.0 66.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): .0 EWR FREQUENCY (HZ): REMARKS: MAD PASS RUN AFTER MWD RUN 14. $ CN WN FN .COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 2 RPX MAD 68 1 OHMM 3 RPS MAD 68 1 OHMM 4 RPM MAD 68 1 OHMM 5 RPD MAD 68 1 OHMM 6 FET MAD 68 1 HR 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 42 Tape File Start'Depth = 12130.000000 Tape File'End Depth = 11385.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 80741 datums Tape Subfile: 15 108 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 16 is type: LIS FILE HEADER FILE NUMBER: 15 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 15 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12112.0 EWR4 12119.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFT~ARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12823.0 12830.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 05-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 12852.0 12112.0 12830.0 0 88.3 94.0 TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO'PRO 9.00 68.0 9.5 34000 4.9 .140 · 140 .138 .140 '65.0 183.0 65.0 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): .0 EWR FREQUENCY (HZ): REMARKS: MAD PASS AFTER MWD RUN 15. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MAD 68 1 AAPI 2 RPX MAD 68 1 OHMM 3 RPS MAD 68 1 OHMM 4 RPM MAD 68 1 OHMM 5 RPD MAD 68 1 OHMM 6 FET MAD 68 1 HR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 41 Tape File Start Depth = 12835.000000 Tape File End Depth = 12110.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 205314 datums Tape Subfile: 16 107 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 17 is type: LIS FILE HEADER FILE NUMBER: 16 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 16 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12809.0 EWR4 12816.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13203.0 13210.0 06-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 13228.0 12809.0 13210.0 0 88.1 90.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS . 4 $ TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.10 66.0 10.0 34000 4.8 .150 .050 .140 .180 65.0 193.0 65.0 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 ,000 TOOL STANDOFF (IN): .0 EWR FREQUENCY (HZ)-: REMARKS: MAD PASS RUN AFTER MWD RUN 16. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 4 2 RPX MAD 68 1 OHMM 4 3 RPS MAD 68 1 OHMM 4 4 RPM MAD 68 1 OHMM 4 5 RPD MAD 68 1 OHMM 4 6 FET MAD 68 1 HR 4 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 24 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 24 Tape File Start Depth = 13215.000000 Tape File End Depth = 12800.000000 Tape File Level Spacing = 0.500000 Tape File'Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 86559 datums Tape Subfile: 17 90 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 18 is type:' LIS FILE HEADER FILE NUMBER: 17 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 17 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13204.0 EWR4 13207.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13319.0 13329.0 07-NOV-95 MSC 1.32 / ISC 2.12 NGP 5.21 / CIM 3.93 MEMORY 13359.0 13204.0 13329.0 0 88.0 90.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0412SP4 P0412SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10602.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 9.10 66.0 10.5 34000 4.8 .150 .050 .140 .180 65.0 191.0 65.0 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): .0 EWR FREQUENCY (HZ): REMARKS: MAD PASS RUN AFTER MWD RUN 17. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAP I 2 RPX MAD 68 1 OHMM 3 RPS MAD 68 1 OHMM 4 RPM MAD 68 1 OHMM 5 RPD MAD 68 1 OHMM 6 FET MAD 68 1 HR 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 1 4 4 95 995 99 '1 24 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 13335.000000 Tape File End Depth = 13200.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 207212 datums Tape Subfile: 18 74 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 19 is type:-LIS 96/ 8/15 01 **** REEL TRAILER **** 96/ 8/15 01 Tape Subfile: 19 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 15 AUG 96 3:33p Elapsed execution time = 18.62 seconds. SYSTEM RETURN CODE = 0 G-21 PRUDHOE BAY 9370 t"- - -:-: 10223 .j ,,:_ .] \ -~ _:..~ ,.i=, ~ WESTERN i :'--,,:.. :_~~ _--- ATLAS Eogging Se~ices .dpe. Subfile 2 is type' TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD G-21 500292260400 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 26-DEC-95 6529.00 K. BRUNNER E. RANDALL 12 llN 13E 2911 2368 70.05 68.55 34.50 GRCH 9381.0 9394.5 9397.5 9402.0 9410.0 9411.5 9437.0 9437.5 9438.0 9439.0 9448.0 9448.5 9457.0 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH 9381.0 9395.5 9399.0 9403.5 9406.5 9408.0 9436.0 9437.5 9438.5 9439.0 9448.0 9449.0 9457.0 MWD GR 1 1 UNKNOWN SPERRY-SUN DRILLING SERVICES PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 7.000 10602.0 29.00 3RD STRING 4.500 13359.0 12.60 PRODUCTION STRING 4.500 9878.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS 9459 ~0 9464.5 9466.0 9471.0 9472.0 9472.5 9483.0 9483.5 9490.5 9498.5 9499.0 9500.5 9501.5 9514.5 9515.0 9521.5 9522.5 9524.5 9525.0 9525.5 9527.5 9533.0 9540.5 9542.0 9543.0 9543.5 9547.0 9556.5 9559.5 9560.0 9561.0 9562.5 9563.0 9564.5 9565.5 9567.0 9569.0 9569.5 9572.0 9576.0 9584.0 9584.5 9586.5 9599.0 9600.0 9603.0 9603.5 9604.5 9605.5 9617.5 9618.5 9619.0 9622.0 9629.5 9630.5 9631.5 9632.0 9633.5 9634.5 9635.0 ~8.5 9~64.0 9466.5 9470.0 9471.0 9472.0 9482.5 9483.5 9490.0 9498.0 9499.0 9500.5 9501.0 9514.0 9515.0 9521.5 9522.0 9524.0 9525.0 9525.5 9527.0 9532.5 9540.0 9540.5 9541.0 9541.5 9545.5 9555.0 9557.5 9558.0 9558.5 9560.0 9561.0 9562.5 9563.0 9564.5 9566.5 9567.5 9570.0 9575.5 9584.0 9585.0 9587.0 9599.0 9599.5 9602.5 9603.5 9604.5 9605.0 9618.0 9619.0 9620.0 9622.5 9630.0 9630.5 9631.5 9632.5 9634.0 9634.5 9635.0 9635 .,5 9639.5 9645.5 9670.5 9673.0 9674.0 9682.0 9684.5 9687.5 9694.0 9709.0 9737.0 9785.0 9785.5 9921.0 9923.0 9924.0 9926.5 9928.5 9933.5 9948.5 9954.5 9959.0 9960.0 9964.0 9964.5 9965.5 10014.0 10019.0 10023.0 10023.5 10024.0 10048.5 10054.0 10058.0 10063.5 10072.5 10075.5 10095.0 10099.5 10100.5 10102.5 10104.0 10108.0 10108.5 10109.5 10120.0 10121.0 10122.0 10125.0 10126.5 10132.0 10132.5 10141.0 10154.5 10155.0 10156.0 10157.5 10158.5 10159.0 35.5 ~639.0 9645.5 9671.0 9673.5 9674.0 9680.5 9684.0 9687.5 9694.0 9709.5 9737.0 9784.0 9784.5 9920.5 9922.5 9923.0 9926.0 9927.5 9932.5 9949.0 9955.5 9959.5 9960.0 9964.0 9965.5 9966.5 10013.5 10018.5 10022.5 10023.5 10024.0 10049.0 10055.0 10058.5 10064.0 10072.5 10075.5 10093.0 10098.5 10099.5 10102.0 10103.5 10107.5 10108.5 10109.5 10122.0 10123.0 10123.5 10126.5 10128.0 10132.0 10132.5 10142.0 10156.5 10157.0 10157.5 10159.0 10159.5 10160.0 10160.0 1 16o.5 10163.0 10182.0 10186.0 $ REMARKS: ' 60.5 10164.0 10181.5 10187.0 CN/GR Cased Hole. TIED INTO MWD DGR-CN LOG. WELL IS HIGH ANGLE 96 DEGREES. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. PER BP INSTRUCTIONS, SPERRY MWD GR IS THE DEPTH REFERENCE FOR THIS WELL. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO MWD GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A. OUT $ FIL~ FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9355.0 10204.0 9374.0 10223.0 (MEASURED DEPTH) BASELINE DEPTH 9381.0 9395.5 9399.0 9403.5 9406.5 9408.0 9417.5 9427.0 9436.0 9437.5 9438.5 9439.0 9443.0 9448.0 9449.0 9457.0 9459.0 9464.5 9466.0 9471.0 9472.0' 9472.5 9476.5 9483.0 9483.5 9490.5 9498.5 9499.0 95O0.5 9501.5 9503.5 9514.5 9515.0 9521.5 9522.5 9524.5 9525.0 9525.5 9527.5 files. ......... EQUIVALENT UNSHIFTED DEPTH ......... NPHI 9381.0 9394.5 9397.5 9402.0 9410.0 9411.5 9417.0 9427.5 9437.0 9437.5 9438.0 9439.0 9441.5 9448.0 9448.5 9457.0 9458.5 9464.0 9466.5 9470.0 9471.0 9472.0 9476.5 9482.5 9483.5 9490.0 9498.0 9499.0 9500.5 9501.0 9503.0 9514.0 9515.0 9521.5 9522.0 9524.0 9525.0 9525.5 9527.0 ~95332 9540 · 9542. 9543 · 9543 · 9547. 9556. 9559. 9560. 9561. 9562. 9563. 9567. 9569. 9569. 9572. 9576. 9579 · 9584. 9584. 9586. 9600. 9603. 9603. 9604. 9605. 9617. 9618 · 9619. 9622 · 9629. 9630. 9631. 9632 · 9633. 9634. 9635. 9635 · 9639. 9645. 9651 · 9670. 9673. 9674. 9677. 9682. 9684. 9687. 9694. 9709 · 9737. 9781. 9785. 9785 · 9808. 9921. 9923. 9924. 9926. 9928. 0 5 0 0 5 0 5 5 0 0 5 0 0 0 5 0 5 5 0 5 5 5 0 5 5 5 5 5 0 0 5 5 5 0 5 5 0 5 5 5 0 5 0 0 0 0 5 5 0 0 0 5 0 5 0 0 0 0 5 5 '2.5 9u40.0 9540.5 9541.0 9541.5 9545.5 9555.0 9557.5 9558.0 9558.5 9560.0 9561.0 9563.5 9566.5 9567.5 9570.0 9574.0 9580.5 9584.0 9585.0 9587.0 9599.0 9602.5 9603.5 9604.5 9605.0 9618.0 9619.0 9620.0 9622.5 9630.0 9630.5 9631.5 9632.5 9634.0 9634.5 9635.0 9635.5 9638.5 9645.5 9649.5 9671.0 9673.5 9674.0 9675.5 9680.5 9684.0 9687.5 9694.0 9709.5 9736.0 9781.0 9784.0 9784.5 9807.0 9920.5 9922.5 9923.0 9926.0 9927.5 9929°0 9933.5 9948.5 9954.5 9959.0 9960.0 9964.0 9964.5 9965.5 10014.0 10019.0 10023.0 10023.5 10024.0 10048.5 10054.0 10058.0 10063.5 10071.0 10072.5 10075.5 10095.0 10103.0 10108.0 10108.5 10109.5 10120.0 10121.0 10122.0 10126.5 10132.0 10132.5 10135.0 10141.0 10147.5 10154.5 10155.0 10156.0 10157.5 10158.5 10159.0 10160.0 10160.5 10163.5 10166.5 10168.5 10173.0 10175.0 10182.0 10186.0 $ REMARKS: 9.0 9=$2.5 9949.0 9954.0 9959.5 9960.0 9964.0 9965.5 9966.5 10013.5 10018.5 10022.5 10023.5 10024.0 10049.0 10055.0 10059.5 10064.0 10070.0 10072.5 10075.5 10091.5 10105.0 10107.5 10108.5 10109.5 10122.0 10123.0 10123.5 10128.5 10132.0 10132.5 10137.5 10144.0 10151.5 10156.5 10157.0 10157.5 10159.0 10159.5 10160.0 10160.5 10161.0 10163.5 10167.0 10169.0 10173.5 10176.0 10182.5 10185.5 PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO MWD GAMMA RAY. / ? ?MATCH1B. OUT $ WN FN COUN STAT * FORMAT RECORD BP ~PLORATION (ALASKA) G-2~ PRUDHOE BAY NORTH SLOPE ALASKA (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS * DATA RECORD (TYPE# O) Total Data Records: 37 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 1006 BYTES * Tape File Start Depth = 10235.000000 Tape File End Depth = 9325.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9106 datums Tape Subfile: 2 430 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tap~ Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 9341.0 9360.0 STOP DEPTH 10204.0 10223.0 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH GRCH NPHI 9390.0 9389.0 9390.5 9389.5 9392.0 9390.5 9392.5 9391.0 9393.5 9391.5 9394.5 9393.0 9398.0 9396.5 9399.0 9397.0 9402.0 9400.0 9404.0 9402.0 9404.5 9403.0 9405.0 9403.5 9406.0 9404.0 9407.0 9405.0 9407.5 9406.0 9408.0 9406.5 9411.0 9408.0 9411.5 9408.5 9412.5 9409.0 9413.0 9409.5 9417.0 9418.0 9420.0 9420.5 9426.5 9427.0 9435.5 9431.5 9436.5 9436.0 9437.0 9436.5 9438.0 9437.0 9438.5 9438.0 9444.0 9443.0 9446.5 9445.5 9447.0 9446.5 9448.5 9448.0 9449.0 9448.5 9451.5 9450.5 9456.0 9455.0 9457.0 9460.0 9456.0 9457.5 9461.5 9465.0 9466.0 9470.5 9471.5 9473.5 9476.5 9479.5 9480.5 9481.0 9481.5 9482.0 9482.5 9483.5 9485.0 9486.0 9488.0 9489.0 9489.5 9490.0 9491.0 9492.0 9493.0 9493.5 9494.0 9496.5 9497.5 9498.5 9499.0 9499.5 9500.0 9500.5 9501.0 9501.5 9503.0 9503.5 9504.0 9504.5 9505.5 9506.5 9507.0 9511.5 9512.5 9513.0 9517.5 9518.0 9518.5 9519.5 9520.5 9521.0 9525.5 9526.5 9531.0 9531.5 9533.0 9535.0 9536.0 9536.5 9540.5 9541.0 9464.5 9470.5 9475.5 9479.0 9481.0 9485.5 9487.0 9487.5 9488.0 9489.0 9498.0 9498.5 9499.5 9500.5 9502.0 9503.5 9504.0 9505.0 9506.0 9516.5 9517.5 9518.0 9518.5 9519.5 9520.5 9525.0 9525.5 9532.0 9536.0 9540.0 9464.5 9468.0 9471.0 9475.5 9478.5 9479.0 9479.5 9482.5 9483.5 9484.0 9484.5 9485.0 9490.5 9491.5 9492.0 9492.5 9493.5 9496.0 9496.5 9497.5 9498.0 9498.5 9499.5 9502.0 9502.5 9510.0 9510.5 9511.5 9529.5 9530.5 9534.0 9534.5 9539.0 9543'.0 9544.0 9546.0 9547.0 9549.0 9551.0 9556.0 9559.0 9561.5 9562.5 9567.0 9567.5 9570.5 9571.5 9572.0 9574.0 9577.0 9579.5 9580.0 9581.0 9582.0 9583.0 9584.0 9593.0 9600.0 9601.0 9601.5 9604.5 9605.5 9607.0 9612.0 9614.0 9614.5 9615.0 9616.5 9624.0 9625.5 9626.0 9627.0 9627.5 9629.5 9633.5 9634.5 9639.0 9641.5 9642.5 9644.5 9645.5 9646.0 9647.5 9654.0 9655.0 9656.0 9656.5 9658.0 9659.0 9671.5 9673.5 9675.0 9681.0 9u41.5 9545.0 9554.0 9556.5 9559.0 9559.5 9569.0 9572.5 9575.5 9579.0 9580.0 9581.5 9582.5 9583.0 9603.5 9604.0 9616.5 9626.0 9626.5 9633..0 9633.5 9643.5 9644.0 9646.5 9650.5 9670.5 9674.0 9680.5 9541.0 9544.0 9547.0 9549.0 9564.5 9565.0 9567.0 9568.0 9569.0 9579.0 9580.0 9593.0 9598.0 9599.0 9600.0 9605.5 9610.5 9613.5 9614.0 9615.0 9624.0 9624.5 9625.5 9626.5 9627.5 9629.0 9633.5 9638.0 9640.5 9641.0 9644.5 9654.0 9655.0 9656.0 9657.5 9658.0 9671.5 '9683~5 9685.5 9686.0 9686.5 9690.0 9690.5 9691.0 9692.0 9693.0 9693.5 9694.5 9696.0 9696.5 9697.0 9697.5 9698.0 9698.5 9699.0 9699.5 9708.5 9709.0 9720.5 9723.0 9724.0 9728.5 9730.0 9731.0 9731.5 9733.0 9734.0 9737.0 9747.5 9754.5 9755.5 9761.5 9763.0 9768.5 9769.0 9769.5 9776.0 9777.0 9777.5 9781.5 9782.5 9783.5 9787.5 9792.5 9793.0 9800.5 9801.0 9801.5 9802.5 9803.5 9811.0 9835.0 9839.0 9857.5 9861.0 9876.5 9877.5 9985.0 9685.5 9686.0 9691.5 9692.0 9695.5 9696.5 9697.5 9698.5 9699.0 9720.0 9735.0 9746.5 9774.5 9779.5 9787.0 9681.5 9689.5 9690.0 9691.0 9693.5 9694.0 9695.5 9696.5 9697.5 9698.5 9700.0 9708.5 9709.0 9722.5 9723.5 9727.0 9728.5 9729.0 9730.0 9731.5 9732.0 9735.5 9753.5 9754.5 9758.5 9761.5 9767.0 9767.5 9768.0 9775.5 9776.5 9781.5 9782.0 9791.0 9792.0 9799.5 9800.5 9801.0 9801.5 9802.0 9809.5 9833.0 9837.0 9856.0 9859.5 9876.0 9877.0 '9878 9892. 9894. 9894. 9897. 9898. 9907. 9908. 9911. 9918. 9918. 9928. 9933. 9948. 9948. 9949. 9950. 9951. 9958. 9960. 9961. 9962. 9963. 9963. 9964. 9965. 9965. 9969. 9969. 9970. 9971. 9972. 9973. 9975. 9982. 9989. 9998. 10007. 10008. 10011. 10012. 10014. 10019. 10019. 10024. 10024. 10025. 10035. 10036. 10038. 10042. 10042. 10043. 10047. 10048. 10048. 10050. 10052. 10053. 10055. 5 5 0 5 5 0 0 0 5 0 5 0 5 0 5 5 0 0 5 0 5 § 0 5 0 0 5 0 5 5 0 0 5 0 0 5 5 0 0 0 0 5 0 5 0 5 0 0 5 5 0 5 0 5 0 5 0 5 0 0 9918.0 9932.0 9948.0 9958.5 9959.0 9960.5 9961.0 9961.5 9970.0 9971.5 9987.5 10009.0 10010.0 10013.0 10017.5 10018.5 10023.0 10024.5 10025.0 10034.5 10035.5 10048.5 10052.5 10053.5 10055.5 9877.5 9890.5 9892.0 9893.0 9896.0 9897.0 9906.0 9906.5 9910.0 9918.5 9925.0 9947.5 9948.0 9948.5 9949.0 9949.5 9957.0 9963.0 9963.5 9964.0 9964.5 9965.0 9967.5 9970.0 9972.0 9974.0 9975.5 9981.0 9999.0 10005.5 10006.5 10036.5 10040.0 10041.0 10041.5' 10048.5 10049.0 10050.5 10053.0 10054.0 10058.0 10059.5 10062.5 10064.0 10065.0 10066.0 10066.5 10067.0 10068.0 10075.0 10078.0 10080.0 10082.0 10088.0 10097.0 10097.5 10100.5 10103.0 10106.0 10106.5 10107.5 10108.5 10109.5 10111.0 10113.0 10120.0 10124.0 10125.0 10126.0 10129.5 10131.0 10132.0 10133.0 10135.0 10137.5 10140.5 10144.5 10145.5 10147.0 10152.5 10154.5 10157.0 10158.5 10159.5 10160.0 10160.5 10161.0 10161.5 10162.0 10162.5 10166.5 10167.0 10173.0 10173.5 10174.5 10177.5 10183.5 10185.0 10185.5 10186.0 10u59.5 10065.0 10067.5 10074.5 -- 10079.5 10095.5 10096.5 10105.5 10107.0 10108.0 10120.5 10124.5 10125.0 10126.5 10131.0 10138.0 10146.0 10148.0 10153.5 10155.0 10157.5 10158.0 10159.0 10160.0 10160.5 10161.5 10162.0 10162.5 10166.5 10167.5 10172.0 10181.5 10183.0 10184.0 10185.0 10059.0 10063.5 10064.0 10064.5 10065.5 10066.5 10067.0 10077.0 10077.5 10086.0 10100.0 10102.5 10106.0 10107.5 10108.0 10109.0 10109.5 10111.5 10129.5 10132.0 10132.5 10135.0 10143.0 10147.5 10161.5 10175.5 10176.5 10179.5 10186.5 i0187~0 10188.5 10190.0 10197.0 10197.5 10206.5 10207.0 10218.0 10225.0 10225.5 $ REMARKS: 1 6.0 10198.0 10199.0 10208.0 10208.5 10191.0 10192.5 10218.0 10225.0 10225.5 PASS 2. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH2A. OUT / ??MATCH2B. OUT $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) Total Data Records: 37 1006 BYTES * Tape File Start Depth = 10235.000000 Tape File End Depth = 9325.000000 Tape File Level Spacing 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9106 datums Tape Subfile: 3 Minimum record length: Maximum record length: 418 records... 62 bytes 1006 bytes Tape Subfile 4 is type: LIS PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9340.0 10204.0 9359.0 10223.0 BASELINE DEPTH 9356.5 9385.0 9386.5 9387.0 9399.0 9400.5 9403.0 9405.0 9409.0 9417.5 9426.0 9433.5 9435.5 9442.5 9443.0 9454.5 9460.0 9461.0 9463.0 9465.0 9466.0 9471.0 9472.5 9473.0 9477.0 9477.5 9480.0 9485.5 9486.5 9488.0 9489.0 9490.5 9492.5 9496.0 9498.5 9499.0 9503.5 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH NPHI 9355.0 9396.5 9401.0 9407.0 9417.5 9427.5 9435.0 9442.5 9454.0 9459.0 9459.5 9463.0 9464.5 9470.0 9471.5 9476.0 9479.0 9485.0 9487.0 9487.5 9489.5 9497.0 9498.0 9388.0 9389.5 9390.5 9398.0 9404.0 9432.0 9441.5 9464.5 9469.5 9476.0 9484.0 9489.5 9494.5 9502.0 FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. 9515.0 9524.5 9525.0 9528.5 9530.5 9532.0 9533.0 9538.0 9540.5 9541.0 9543.5 9544.0 9546.0 9547.0 9550.0 9550.5 9552.0 9553.0 9554.0 9554.5 9557.0 9558.5 9560.5 9561.0 9561.5 9562.5 9566.5 9567.0 9572.5 9574.0 9575.0 9575.5 9578.0 9580.0 9581.0 9582.0 9582.5 9584.0 9590.0 9591.5 9592.5 9593.0 9593.5 9594.0 9595.0 9595.5 9600.5 9601.5 9602.0 9604.0 9605.0 9605.5 9607.5 9614.5 9616.5 9617.0 9618.0 9623.5 9624.5 9625.5 9524.0 9527.0 9537.0 9540.0 9541.5 9544.5 9547.5 9548.5 9550.0 9550.5 9551.5 9552.5 9555.0 9556.0 9558.0 9558.5 9560.0 9564.0 9569.5 9572.5 9573.5 9579.0 9580.0 9582.0 9583.5 9593.5 9594.0 9594.5 9595.0 9600.5 9603.0 9603.5 9604.0 9616.5 9617.0 9617.5 9514.5 9524.0 9534.0 9534.5 9535.0 9539.0 9542.0 9544.0 9558.5 9565.0 9574.0 9577.5 9582.5 9583.0 9590.0 9591.5 9592.0 9592.5 9599.5 9600.5 9601.5 9607.0 9615.0 9624.0 9624.5 9625.0 9626. 9627. 9632. 9633. 9633. 9634 · 9634. 9635. 9635. 9639. 9641 · 9642. 9645. 9648. 9648. 9649. 9650 · 9666. 9672 · 9675 · 9678. 9679. 9679. 9687. 9687. 9692. 9693. 9698. 9699. 9700. 9718. 9723. 9726. 9728. 9729. 9731. 9732. 9732. 9733. 9735. 9736. 9744 · 9758. 9759. 9759. 9760. 9761. 9776. 9777. 9780. 9781 · 9781. 9782. 9783. 9785. 9786. 9791. 9796. 9798. 9800. 9632.0 9632.5 9633.0 9633.5 9634.5 9677.5 9678.0 9678.5 9691.5 9692.0 9699.5 9730.5 9731.5 9734.0 9735.0 9774.5 9783.0 9783.5 9793.5 9625.5 9627.5 9633.0 9633.5 9634.0 9638.0 9640.0 9640.5 9644.0 9647.0 9647.5 9648.0 9648.5 9666.5 9672.0 9673.0 9677.5 9686.0 9687.0 9698.0 9699.5 9700.0 9718.0 9723.0 9725.5 9727.0 9727.5 9731.0 9732.0 9744.0 9757.5 9758.0 9758.5 9759.5 9760.0 9775.0 9779.0 9780.0 9780.5 9781.0 9781.5 9789.5 9796.5 9799.0 .9807-.5 9837.5 9838.5 9855.5 9856.5 9861.0 9861.5 9874.5 9880.5 9893.0 9894.0 9901.0 9902.0 '9902.5 9904.0 9904.5 9905.0 9907.0 9907.5 9912.5 9921.0 9924.0 9931.5 9933.0 9948.0 9949.5 9950.5 9958.5 9960.0 9961.5 9962.0 9962.5 9963.0 9964.5 9965.0 9967.5 9970.0 9974.0 9983.0 9995.5 10011.5 10014.0 10014.5 10018.0 10018.5 10019.0 10020.0 10021.5 10022.0 10024.0 10025.0 10025.5 10041.5 10042.0 10048.5 10052.0 10055.0 10058.0 10059.5 10060.0 9919.5 9931.5 9948.0 9958.5 9959.0 9961.0 9961.5 9963.0 9964.0 9970.0 9982.5 10010.0 10012.5 10013.5 10017.0 10018.0 10018.5 10019.0 10020.5 10021.5 10023.5 10024.0 10024.5 10049.0 10055.5 10059.5 10060.0 9806.0 9836.0 9836.5 9853.5 9854.0 9860.0 9860.5 9874.0 9880.0 9892.0 9892.5 9899.5 9900.0 9900.5 9902.5 9903.0 9904.0 9906.0 9907.0 9911.0 9922.0 9931.0 9949.0 9949.5 9960.5 9961.0 9966.0 9972.5 9993.0 10039.0 10039.5 10052.5 10058.5 10061.0 10063.0 10063.5 10064.5 10067.5 10068.5 10069.5 10071.0 10078.5 10079.5 10083.0 10090.0 10093.0 10094.0 10094.5 10095.5 10096.0 10097.0 10099.5 10100.0 10106.5 10107.0 10107.5 10108.0 10109.0 10109.5 10110.5 10112.5 10113.5 10119.5 10120.5 10121.5 10123.0 10128.5 10135.0 10138.5 10144.5 10157.0 10158.0 10158.5 10159.5 10160.0 10163.0 10163.5 10164.5 10168.0 10181.5 10182.5 10186.0 10197.5 10201.0 10207.0 10208.0 10212.0 10225.0 10225.5 REMARKS: 50.5 10063.0 10070.5 10091.5 10092.0 10095.0 10097.5 10098.5 10105.0 10106.0 10107.0 10107.5 10108.0 10120.0 10121.0 10121.5 10128.5 10133.0 10138.5 10157 10157 10158 10159 10160 10164 10168 .0 .5 .5 .5 .5 .0 10063.0 10063.5 10064.0 10067.0 10067.5 10068.0 10077.0 10077.5 1D081.0 10087.5 10090.5 10093.5 10094.0 10108.5 10109.0 10109.5 10111.5 10112.0 .5 10181.0 10184.5 10199.0 10208.5 10209.0 10121.5 10137.0 10148.5 10162.5 10164.0 10183.5 10202.5 10212.5 10226.0 10225.0 10226.5 10225.5 PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH3A. OUT / ? ?MATCH3 B. OUT $ BP EXPLORATION (ALASKA) G-21 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TypE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 37 Tape File Start Depth = 10235.000000 Tape File End Depth = 9325.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18212 datums Tape Subfile: 4 344 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass i gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name ToOl Code SamPles Units 1 GRCH CNAV 68 1 GAPI 2 NPHI CNAV 68 1 PU-S 3 FUCT CNAV 68 1 CPS 4 NUCT CNAV 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 16 * DATA RECORD (TYPE# 0) Total Data Records: 37 1006 BYTES * Tape File Start Depth = 10235.000000 Tape File End Depth = 9325.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 5 Minimum record length: Maximum record length: 18212 datums 60 records... 62 bytes 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9355.0 2418 9374.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10207.5 10226.5 21-NOV-95 FSYS REV. J001 VER. 1.1 1031 21-NOV-95 13272.0 10225.0 9370.0 10223.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV PCM GR PRES TEMP CN $ SWIVEL SUB PCM/CCL GAMMA RAY SIDELOADER HP PRES. PRESS/TEMP COMPENSATED NEUTRON TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 8226XA/2172XE 8255XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 13359.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): COMPLETION FLUIDS .00 .0 193.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 .000 BLUELINE COUNT R~£E NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 4 42 635 99 1 32 * DATA RECORD (TYPES O) 1014 BYTES * Total Data Records: 126 Tape File Start Depth = 10230.000000 Tape File End Depth = 9350.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 49902 datums Tape Subfile: 6 Minimum record length: Maximum record length: 203 records... 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9341.0 2418 9360.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10205.5 10224.5 21-NOV-95 FSYS REV. J001 VER. 1.1 1116 21-NOV-95 13272.0 10225.0 9370.0 10223.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV PCM GR PRES TEMP CN $ SWIVEL SUB PCM/CCL GAMMA RAY SIDELOADER HP PRES. PRESS/TEMP COMPENSATED NEUTRON TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 8226XA/2172XE 8255XA 2418XA BOREHOLE AND CASING DATA oPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 13359.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): COMPLETION FLUIDS .00 .0 193.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 .000 BLUELINE COUNT ~__E NORMALIZATION IN OIL ZON~ TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 129 Tape File Start Depth = 10228.000000 Tape File End Depth = 9332.000000 TaPe File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 50478 datums Tape Subfile: 7 Minimum record length: Maximum record length: 206 records... 42 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9340.0 2418 9359.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10210.0 10229.0 21-NOV-95 FSYS REV. J001 VER. 1.1 1200 21-NOV-95 13272.0 10225.0 9370.0 10223.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV PCM GR PRES TEMP CN $ SWIVEL SUB PCM/CCL GAMMA RAY SIDELOADER HP PRES. PRESS/TEMP COMPENSATED NEUTRON TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 8226XA/2172XE 8255XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT): .000 13359.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): COMPLETION FLUIDS .00 .0 193.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 .000 BLUELINE COUNT RA'~'F. NORMALIZATION IN OIL ZONE TOP NORMALI ZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): . 0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR 2418 68 i GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPES O) 1014 BYTES * Total Data Records: 130 Tape File Start Depth = 10233.000000 Tape File End Depth = 9329.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 82456 datums Tape Subfile: 8 Minimum record length: Maximum record length: 207 records... 62 bytes 1014 bytes Tape Subfile 9 is type~ LIS 95/12/26 01 **** REEL TRAILER **** 95/12/28 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 28 DEC 95 1:54p Elapsed execution time = 16.48 seconds. SYSTEM RETURN CODE = 0