Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-172CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Joseph Lastufka To:Guhl, Meredith D (OGC) Cc:Abbie Barker Subject:Correction to surveys for PBU 04-29A (PTD #195-172) PBU 04-29AL1 (PTD #200-178) and 04-29AL1PB1 Date:Thursday, December 16, 2021 10:07:09 AM Attachments:PBU 04-29AL1PB1_DEV_SURVEY_REPORT.pdf PBU 04-29A_DEV_SURVEY_DATA_FILE.xlsx PBU 04-29A_DEV_SURVEY_REPORT.pdf PBU 04-29AL1_DEV_SURVEY_DATA_FILE.xlsx PBU 04-29AL1_DEV_SURVEY_REPORT.pdf PBU 04-29AL1PB1_DEV_SURVEY_DATA_FILE.xlsx Meredith, Due to a correction on a recently submitted 10-403 for PBU 04-29A (PTD #195-172) TVD at TD, it was determined that the state copy of the submitted 10-407 and attached definitive survey had an error: the vendor used the wrong TVD at the window for 04-29A which effects this well’s TVD from kickoff to TD as well as 04-29AL1 (PTD #200-178) and 04-29AL1PB1. Please see corrected surveys for PBU 04-29A, 04-29AL1 and 04-29AL1PB1, if you have any questions please don’t hesitate to let me know. Thanks! Thanks, Joe Lastufka Sr. Drilling Technologist Hilcorp North Slope, LLC Office: (907)777-8400, Cell:(907)227-8496 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Survey Report - Geographic 15 December, 2021 Design: 04-29A Hilcorp Alaska, LLC Prudhoe Bay 04 04-29 5002921453 04-29A HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AWellbore: Design:04-29A Database:EDM_Master Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Prudhoe Bay, North Slope, UNITED STATES Alaska Zone 04 Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Position: From: Site Latitude: Longitude: Position Uncertainty: Northing: Easting: Grid Convergence: 04, TR-11-15 Map Slot Radius:0.00 usft usft usft "° 5,953,265.35 711,234.97 0 70.27544380 -148.29108514 1.61 Well Well Position Longitude: Latitude: Easting: Northing: +E/-W +N/-S Position Uncertainty Ground Level: 04-29, 04-29 Wellhead Elevation:0.00 0.00 0.00 5,951,625.46 713,340.54 31.94 70.27080301 -148.27443652 30.70 usft usft usft usft usft usft usft Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) 04-29A Model NameMagnetics IGRF2000 12/19/1995 28.83 80.76 57,333.64312748 Phase:Version: Audit Notes: Design 04-29A 2 ACTUAL Vertical Section:Depth From (TVD) (usft) +N/-S (usft) Direction (°) +E/-W (usft) Tie On Depth:10,094.00 28.06 0.00 0.00 95.57 From (usft) Survey Program DescriptionTool NameSurvey (Wellbore) To (usft) Date 5/26/2021 3_Gyro-CT_pre-1998_Csg1 H073Ga: First generation Continuous Gyro1 : Schlumberger GCT multishot (04-29)94.00 10,094.00 3_MWD A001Mb/ISC4: BGGM declination correction onlyMWD - Standard (04-29A)10,179.00 13,800.70 Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 28.06 0.00 28.06 0.00 0.000.00 713,340.545,951,625.46 70.27080301 -148.27443652 94.00 0.17 94.00 -0.10 -0.01184.30 713,340.535,951,625.37 70.27080274 -148.27443658 194.00 0.33 194.00 -0.49 0.13149.20 713,340.685,951,624.97 70.27080166 -148.27443547 294.00 0.17 294.00 -0.89 0.26186.00 713,340.825,951,624.58 70.27080059 -148.27443441 394.00 0.08 394.00 -1.08 0.19235.30 713,340.755,951,624.39 70.27080007 -148.27443500 494.00 0.07 494.00 -1.17 0.16152.90 713,340.735,951,624.30 70.27079982 -148.27443524 594.00 0.32 594.00 -1.49 0.27162.50 713,340.855,951,623.98 70.27079894 -148.27443433 694.00 0.30 694.00 -2.02 0.39172.40 713,340.985,951,623.46 70.27079750 -148.27443337 794.00 0.37 793.99 -2.59 0.37189.50 713,340.985,951,622.88 70.27079593 -148.27443352 894.00 0.18 893.99 -3.07 0.35169.31 713,340.975,951,622.41 70.27079463 -148.27443372 994.00 0.18 993.99 -3.38 0.35188.80 713,340.985,951,622.10 70.27079379 -148.27443368 12/15/2021 1:15:00PM COMPASS 5000.15 Build 90 Page 2 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AWellbore: Design:04-29A Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 1,094.00 0.25 1,093.99 -3.72 0.43151.50 713,341.075,951,621.75 70.27079284 -148.27443303 1,194.00 0.50 1,193.99 -4.29 0.76148.31 713,341.425,951,621.20 70.27079130 -148.27443034 1,294.00 0.40 1,293.99 -4.97 1.16152.20 713,341.835,951,620.53 70.27078944 -148.27442717 1,394.00 0.37 1,393.98 -5.55 1.49147.61 713,342.185,951,619.96 70.27078786 -148.27442445 1,494.00 1.10 1,493.98 -6.03 2.60102.90 713,343.315,951,619.51 70.27078653 -148.27441548 1,594.00 4.12 1,593.86 -7.08 7.03103.31 713,347.775,951,618.59 70.27078368 -148.27437964 1,694.00 7.25 1,693.36 -10.37 16.34113.00 713,357.165,951,615.56 70.27077468 -148.27430438 1,794.00 9.33 1,792.31 -15.90 29.65112.20 713,370.635,951,610.41 70.27075958 -148.27419671 1,894.00 11.82 1,890.60 -22.32 46.84109.11 713,387.995,951,604.49 70.27074205 -148.27405774 1,994.00 15.53 1,987.75 -29.36 69.39106.00 713,410.735,951,598.08 70.27072280 -148.27387536 2,094.00 17.45 2,083.64 -35.99 96.97101.31 713,438.485,951,592.24 70.27070468 -148.27365237 2,194.00 19.38 2,178.52 -41.24 128.1198.00 713,469.755,951,587.87 70.27069034 -148.27340059 2,294.00 20.83 2,272.42 -45.66 162.1996.81 713,503.955,951,584.42 70.27067827 -148.27312495 2,394.00 23.87 2,364.90 -51.07 199.8299.40 713,541.715,951,580.08 70.27066347 -148.27282069 2,494.00 23.75 2,456.39 -58.39 239.51101.50 713,581.605,951,573.88 70.27064347 -148.27249970 2,594.00 25.27 2,547.38 -66.70 280.16101.61 713,622.465,951,566.73 70.27062076 -148.27217104 2,694.00 26.28 2,637.43 -76.13 322.60103.40 713,665.155,951,558.51 70.27059501 -148.27182782 2,794.00 27.55 2,726.59 -86.62 366.63103.40 713,709.465,951,549.27 70.27056634 -148.27147174 2,894.00 31.85 2,813.44 -97.56 414.94102.20 713,758.065,951,539.71 70.27053645 -148.27108110 2,944.00 33.90 2,857.21 -115.00 428.38180.00 713,771.995,951,522.65 70.27048880 -148.27097241 2,994.00 37.22 2,899.94 -132.67 443.99100.90 713,788.095,951,505.44 70.27044054 -148.27084621 3,094.00 38.98 2,978.63 -144.28 504.59100.81 713,848.995,951,495.55 70.27040879 -148.27035620 3,194.00 41.85 3,054.76 -156.67 568.22101.20 713,912.945,951,484.97 70.27037495 -148.26984166 3,294.00 46.55 3,126.43 -169.58 636.71100.20 713,981.775,951,474.01 70.27033966 -148.26928785 3,394.00 50.37 3,192.74 -181.91 710.5298.81 714,055.895,951,463.77 70.27030595 -148.26869101 3,494.00 53.55 3,254.35 -192.71 788.5297.00 714,134.165,951,455.19 70.27027642 -148.26806030 3,594.00 53.87 3,313.56 -199.17 868.8292.20 714,214.615,951,451.01 70.27025876 -148.26741094 3,694.00 53.88 3,372.56 -206.97 949.1498.90 714,295.115,951,445.49 70.27023741 -148.26676148 3,794.00 53.48 3,431.82 -215.90 1,029.1793.81 714,375.365,951,438.84 70.27021301 -148.26611433 3,894.00 52.67 3,491.89 -221.48 1,108.9194.20 714,455.235,951,435.52 70.27019773 -148.26546949 3,994.00 54.30 3,551.39 -227.50 1,189.0694.40 714,535.515,951,431.77 70.27018123 -148.26482145 4,094.00 57.85 3,607.20 -234.61 1,271.7195.40 714,618.335,951,427.01 70.27016179 -148.26415306 4,194.00 58.03 3,660.28 -242.51 1,356.0995.31 714,702.895,951,421.50 70.27014014 -148.26347076 4,294.00 58.48 3,712.89 -250.38 1,440.7795.31 714,787.755,951,416.03 70.27011860 -148.26278607 4,394.00 58.48 3,765.17 -258.13 1,525.6695.11 714,872.835,951,410.70 70.27009741 -148.26209961 4,494.00 57.62 3,818.09 -264.13 1,610.2993.00 714,957.595,951,407.09 70.27008095 -148.26141528 4,594.00 56.88 3,872.19 -267.95 1,694.3192.20 715,041.675,951,405.66 70.27007047 -148.26073591 4,694.00 54.53 3,928.53 -271.55 1,776.8492.81 715,124.275,951,404.40 70.27006057 -148.26006857 4,794.00 55.40 3,985.94 -275.70 1,858.6193.00 715,206.125,951,402.56 70.27004918 -148.25940733 4,894.00 55.12 4,042.93 -280.23 1,940.6693.31 715,288.275,951,400.37 70.27003677 -148.25874386 4,994.00 53.32 4,101.39 -285.88 2,021.5894.70 715,369.315,951,397.01 70.27002126 -148.25808951 5,094.00 53.47 4,161.02 -292.60 2,101.5894.90 715,449.465,951,392.57 70.27000285 -148.25744267 5,194.00 53.43 4,220.58 -300.10 2,181.5695.81 715,529.625,951,387.34 70.26998231 -148.25679594 5,294.00 53.38 4,280.19 -308.36 2,261.4296.00 715,609.685,951,381.35 70.26995968 -148.25615018 5,394.00 53.27 4,339.92 -317.43 2,341.1197.00 715,689.595,951,374.53 70.26993481 -148.25550585 5,494.00 54.90 4,398.58 -327.38 2,421.4897.11 715,770.205,951,366.87 70.26990756 -148.25485596 5,594.00 54.17 4,456.60 -337.81 2,502.2597.61 715,851.245,951,358.73 70.26987899 -148.25420283 5,694.00 54.22 4,515.10 -348.76 2,582.6197.90 715,931.875,951,350.07 70.26984902 -148.25355306 5,794.00 54.22 4,573.57 -360.68 2,662.8699.00 716,012.425,951,340.43 70.26981638 -148.25290422 5,894.00 55.50 4,631.12 -373.69 2,743.5999.31 716,093.485,951,329.71 70.26978075 -148.25225146 5,994.00 54.85 4,688.23 -387.89 2,824.44100.61 716,174.705,951,317.81 70.26974189 -148.25159774 6,094.00 54.17 4,746.29 -403.22 2,904.40101.11 716,255.065,951,304.75 70.26969990 -148.25095119 6,194.00 54.43 4,804.64 -418.94 2,984.08101.20 716,335.145,951,291.30 70.26965690 -148.25030699 6,294.00 54.25 4,862.94 -434.79 3,063.76101.31 716,415.245,951,277.71 70.26961349 -148.24966269 6,394.00 54.38 4,921.27 -451.07 3,143.34101.81 716,495.245,951,263.69 70.26956893 -148.24901929 12/15/2021 1:15:00PM COMPASS 5000.15 Build 90 Page 3 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AWellbore: Design:04-29A Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 6,494.00 54.17 4,979.66 -467.47 3,222.85101.50 716,575.185,951,249.56 70.26952403 -148.24837644 6,594.00 54.37 5,038.06 -482.26 3,302.6699.50 716,655.385,951,237.03 70.26948353 -148.24773113 6,694.00 54.30 5,096.37 -496.30 3,382.68100.40 716,735.765,951,225.27 70.26944508 -148.24708413 6,794.00 54.13 5,154.84 -510.53 3,462.5499.81 716,815.995,951,213.31 70.26940610 -148.24643841 6,894.00 54.25 5,213.35 -524.83 3,542.37100.50 716,896.185,951,201.28 70.26936694 -148.24579300 6,994.00 55.17 5,271.13 -538.29 3,622.8698.50 716,977.035,951,190.10 70.26933005 -148.24514215 7,094.00 55.85 5,327.76 -548.91 3,704.5996.31 717,059.025,951,181.81 70.26930095 -148.24448135 7,194.00 54.07 5,385.17 -557.83 3,785.9896.20 717,140.625,951,175.20 70.26927646 -148.24382332 7,294.00 53.78 5,444.06 -566.85 3,866.3096.61 717,221.165,951,168.46 70.26925172 -148.24317389 7,394.00 53.55 5,503.31 -576.39 3,946.2997.00 717,301.385,951,161.19 70.26922553 -148.24252715 7,494.00 53.52 5,562.74 -587.10 4,025.9998.31 717,381.355,951,152.74 70.26919615 -148.24188273 7,594.00 53.38 5,622.29 -599.12 4,105.4298.90 717,461.095,951,142.98 70.26916320 -148.24124053 7,694.00 52.93 5,682.26 -611.44 4,184.4998.81 717,540.475,951,132.91 70.26912943 -148.24060122 7,794.00 52.27 5,743.00 -623.05 4,263.0798.00 717,619.355,951,123.53 70.26909758 -148.23996583 7,894.00 52.17 5,804.26 -633.99 4,341.3597.90 717,697.905,951,114.82 70.26906759 -148.23933294 7,994.00 52.93 5,865.07 -644.76 4,420.0197.70 717,776.835,951,106.28 70.26903803 -148.23869701 8,094.00 52.87 5,925.39 -655.73 4,499.0198.11 717,856.105,951,097.55 70.26900794 -148.23805828 8,194.00 52.78 5,985.81 -666.97 4,577.8998.11 717,935.275,951,088.56 70.26897710 -148.23742051 8,294.00 52.37 6,046.59 -677.75 4,656.5797.50 718,014.225,951,080.00 70.26894750 -148.23678438 8,394.00 51.98 6,107.91 -688.68 4,734.7998.40 718,092.725,951,071.30 70.26891753 -148.23615190 8,494.00 51.97 6,169.51 -700.12 4,812.7398.31 718,170.955,951,062.07 70.26888612 -148.23552177 8,594.00 51.43 6,231.49 -711.53 4,890.3898.40 718,248.885,951,052.87 70.26885483 -148.23489401 8,694.00 50.90 6,294.20 -722.91 4,967.4498.40 718,326.235,951,043.68 70.26882361 -148.23427099 8,794.00 50.53 6,357.52 -734.08 5,044.0398.20 718,403.105,951,034.69 70.26879294 -148.23365176 8,894.00 50.03 6,421.42 -744.79 5,120.1997.81 718,479.545,951,026.14 70.26876354 -148.23303595 8,994.00 49.82 6,485.80 -755.19 5,196.0097.81 718,555.615,951,017.89 70.26873499 -148.23242303 9,094.00 49.00 6,550.86 -765.38 5,271.2697.61 718,631.115,951,009.84 70.26870701 -148.23181462 9,194.00 50.83 6,615.25 -774.90 5,347.1696.70 718,707.265,951,002.48 70.26868086 -148.23120090 9,294.00 52.18 6,677.50 -783.83 5,424.9296.40 718,785.235,950,995.76 70.26865632 -148.23057226 9,394.00 53.93 6,737.60 -792.18 5,504.4095.61 718,864.915,950,989.66 70.26863334 -148.22992966 9,494.00 54.78 6,795.87 -799.83 5,585.3095.20 718,945.995,950,984.31 70.26861227 -148.22927556 9,594.00 56.13 6,852.58 -806.00 5,667.4393.40 719,028.265,950,980.47 70.26859526 -148.22861152 9,694.00 57.40 6,907.39 -810.75 5,750.9493.11 719,111.865,950,978.09 70.26858212 -148.22793635 9,794.00 57.50 6,961.19 -815.16 5,835.1192.90 719,196.135,950,976.06 70.26856987 -148.22725576 9,894.00 57.23 7,015.12 -819.42 5,919.2292.90 719,280.315,950,974.19 70.26855805 -148.22657575 9,994.00 56.62 7,069.69 -824.03 6,002.8893.40 719,364.085,950,971.96 70.26854529 -148.22589926 10,094.00 55.82 7,125.29 -829.11 6,085.8593.61 719,447.145,950,969.23 70.26853123 -148.22522850 10,179.00 54.83 7,173.65 -834.05 6,155.5794.50 719,516.985,950,966.27 70.26851758 -148.22466475 10,200.00 54.72 7,185.76 -835.42 6,172.6794.65 719,534.115,950,965.39 70.26851381 -148.22452649 10,208.41 52.00 7,190.78 -835.96 6,179.4094.50 719,540.855,950,965.04 70.26851232 -148.22447211 10,276.13 48.82 7,233.93 -840.26 6,231.4094.97 719,592.955,950,962.21 70.26850045 -148.22405167 10,308.21 48.11 7,255.21 -842.37 6,255.3295.14 719,616.925,950,960.78 70.26849461 -148.22385828 10,339.88 48.05 7,276.36 -844.52 6,278.7995.32 719,640.445,950,959.30 70.26848869 -148.22366855 10,371.10 46.82 7,297.48 -846.69 6,301.6895.50 719,663.385,950,957.78 70.26848272 -148.22348348 10,434.13 43.39 7,341.96 -851.12 6,346.1095.90 719,707.915,950,954.61 70.26847052 -148.22312432 10,528.80 43.07 7,410.95 -856.43 6,410.7293.50 719,772.645,950,951.13 70.26845584 -148.22260191 10,621.79 43.18 7,478.82 -860.65 6,474.1494.10 719,836.165,950,948.71 70.26844419 -148.22208909 10,715.87 42.07 7,548.04 -864.71 6,537.7293.20 719,899.835,950,946.46 70.26843294 -148.22157505 10,809.77 41.30 7,618.16 -868.46 6,600.0593.70 719,962.245,950,944.47 70.26842253 -148.22107108 10,904.31 41.03 7,689.34 -872.86 6,662.1394.40 720,024.415,950,941.84 70.26841038 -148.22056921 10,997.64 40.72 7,759.91 -877.65 6,723.0294.60 720,085.405,950,938.77 70.26839714 -148.22007694 11,090.61 39.35 7,831.09 -882.65 6,782.6195.00 720,145.115,950,935.46 70.26838333 -148.21959513 11,185.69 38.83 7,904.88 -887.88 6,842.3395.00 720,204.955,950,931.93 70.26836891 -148.21911227 11,280.18 38.01 7,978.91 -892.94 6,900.8394.90 720,263.575,950,928.53 70.26835492 -148.21863932 11,374.11 36.11 8,053.87 -897.97 6,957.2195.30 720,320.075,950,925.10 70.26834105 -148.21818349 12/15/2021 1:15:00PM COMPASS 5000.15 Build 90 Page 4 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AWellbore: Design:04-29A Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 11,468.79 35.31 8,130.75 -903.08 7,012.2495.30 720,375.215,950,921.56 70.26832696 -148.21773861 11,563.07 35.42 8,207.63 -908.59 7,066.5296.30 720,429.635,950,917.58 70.26831176 -148.21729971 11,594.55 36.28 8,233.15 -910.84 7,084.8297.70 720,447.995,950,915.85 70.26830556 -148.21715178 11,626.09 36.45 8,258.54 -913.44 7,103.3498.30 720,466.575,950,913.78 70.26829841 -148.21700207 11,657.92 37.71 8,283.94 -916.25 7,122.3298.50 720,485.635,950,911.51 70.26829070 -148.21684859 11,688.98 37.94 8,308.47 -919.14 7,141.1599.00 720,504.535,950,909.15 70.26828273 -148.21669639 11,721.33 39.30 8,333.75 -922.43 7,161.0799.70 720,524.535,950,906.43 70.26827371 -148.21653534 11,751.79 39.58 8,357.27 -925.82 7,180.12100.50 720,543.675,950,903.58 70.26826439 -148.21638133 11,782.17 40.82 8,380.47 -929.38 7,199.41100.40 720,563.045,950,900.57 70.26825463 -148.21622544 11,845.04 41.78 8,427.71 -936.79 7,240.23100.20 720,604.065,950,894.32 70.26823425 -148.21589541 11,876.65 41.92 8,451.25 -940.38 7,261.0199.40 720,624.945,950,891.32 70.26822439 -148.21572741 11,908.67 41.76 8,475.11 -943.85 7,282.0999.30 720,646.105,950,888.45 70.26821486 -148.21555703 11,938.08 41.57 8,497.08 -946.98 7,301.3999.10 720,665.485,950,885.87 70.26820627 -148.21540101 11,968.93 41.46 8,520.18 -950.20 7,321.5899.00 720,685.755,950,883.23 70.26819743 -148.21523776 12,000.85 41.15 8,544.16 -953.60 7,342.3799.60 720,706.635,950,880.41 70.26818807 -148.21506967 12,059.36 42.16 8,587.87 -960.09 7,380.7299.60 720,745.145,950,875.02 70.26817025 -148.21475970 12,107.60 42.64 8,623.50 -965.85 7,412.73100.80 720,777.315,950,870.17 70.26815442 -148.21450091 12,138.54 43.32 8,646.13 -969.73 7,433.46100.40 720,798.145,950,866.88 70.26814377 -148.21433330 12,170.23 46.82 8,668.51 -973.36 7,455.6098.30 720,820.375,950,863.87 70.26813379 -148.21415437 12,201.33 51.06 8,688.93 -977.29 7,478.71100.90 720,843.585,950,860.60 70.26812300 -148.21396755 12,232.23 55.82 8,707.34 -981.58 7,503.1499.10 720,868.125,950,857.00 70.26811120 -148.21377001 12,262.56 57.64 8,723.97 -985.59 7,528.1899.10 720,893.265,950,853.70 70.26810017 -148.21356759 12,290.17 59.37 8,738.40 -989.21 7,551.4498.60 720,916.625,950,850.74 70.26809021 -148.21337954 12,326.26 60.68 8,756.43 -994.83 7,582.19102.10 720,947.515,950,845.99 70.26807477 -148.21313100 12,356.79 64.20 8,770.56 -1,000.37 7,608.68101.50 720,974.145,950,841.22 70.26805959 -148.21291686 12,388.64 68.46 8,783.34 -1,005.95 7,637.30100.60 721,002.915,950,836.44 70.26804425 -148.21268547 12,418.95 71.24 8,793.78 -1,011.14 7,665.28100.40 721,031.025,950,832.06 70.26803001 -148.21245932 12,449.67 74.48 8,802.84 -1,015.31 7,694.3296.00 721,060.175,950,828.70 70.26801852 -148.21222452 12,480.93 77.76 8,810.34 -1,018.09 7,724.5494.50 721,090.455,950,826.79 70.26801086 -148.21198024 12,511.91 80.79 8,816.10 -1,020.37 7,754.8994.10 721,120.855,950,825.37 70.26800454 -148.21173487 12,543.89 81.68 8,820.97 -1,022.82 7,786.4094.80 721,152.425,950,823.81 70.26799775 -148.21148011 12,575.24 85.41 8,824.50 -1,025.15 7,817.4593.80 721,183.535,950,822.36 70.26799129 -148.21122901 12,592.52 87.53 8,825.56 -1,026.24 7,834.6793.43 721,200.765,950,821.76 70.26798827 -148.21108986 12,623.85 90.00 8,826.24 -1,027.94 7,865.9492.78 721,232.075,950,820.95 70.26798354 -148.21083701 12,655.57 89.94 8,826.25 -1,029.29 7,897.6392.12 721,263.795,950,820.49 70.26797975 -148.21058079 12,686.66 90.03 8,826.26 -1,030.27 7,928.7091.48 721,294.885,950,820.40 70.26797699 -148.21032955 12,718.16 92.59 8,825.54 -1,031.08 7,960.1891.47 721,326.365,950,820.48 70.26797469 -148.21007503 12,749.44 93.92 8,823.76 -1,031.70 7,991.4190.80 721,357.595,950,820.75 70.26797291 -148.20982259 12,780.87 93.83 8,821.64 -1,032.17 8,022.7690.91 721,388.945,950,821.17 70.26797154 -148.20956908 12,812.78 93.64 8,819.56 -1,032.53 8,054.6090.40 721,420.785,950,821.71 70.26797045 -148.20931165 12,843.86 93.46 8,817.64 -1,032.97 8,085.6291.22 721,451.795,950,822.15 70.26796916 -148.20906086 12,876.52 93.52 8,815.65 -1,033.94 8,118.2092.18 721,484.395,950,822.10 70.26796642 -148.20879741 12,908.52 92.31 8,814.02 -1,035.25 8,150.1392.52 721,516.355,950,821.70 70.26796275 -148.20853925 12,938.19 92.09 8,812.88 -1,036.73 8,179.7493.21 721,545.985,950,821.06 70.26795861 -148.20829985 12,969.75 91.70 8,811.84 -1,038.20 8,211.2592.12 721,577.525,950,820.48 70.26795451 -148.20804510 13,001.79 90.71 8,811.17 -1,039.38 8,243.2692.11 721,609.555,950,820.21 70.26795119 -148.20778629 13,032.82 90.52 8,810.83 -1,040.51 8,274.2792.08 721,640.585,950,819.95 70.26794800 -148.20753560 13,062.25 89.35 8,810.87 -1,041.38 8,303.6991.30 721,670.005,950,819.92 70.26794554 -148.20729776 13,093.33 89.32 8,811.23 -1,041.59 8,334.7689.46 721,701.075,950,820.60 70.26794488 -148.20704650 13,128.12 89.32 8,811.64 -1,041.42 8,369.5590.00 721,735.845,950,821.75 70.26794522 -148.20676523 13,158.90 89.54 8,811.95 -1,041.77 8,400.3391.31 721,766.615,950,822.27 70.26794417 -148.20651640 13,189.79 89.87 8,812.10 -1,043.12 8,431.1893.68 721,797.495,950,821.80 70.26794040 -148.20626692 13,221.12 88.86 8,812.45 -1,045.17 8,462.4493.82 721,828.805,950,820.64 70.26793471 -148.20601418 13,253.03 88.80 8,813.10 -1,047.23 8,494.2893.61 721,860.685,950,819.47 70.26792896 -148.20575679 13,284.07 88.70 8,813.78 -1,048.92 8,525.2792.63 721,891.705,950,818.66 70.26792425 -148.20550627 12/15/2021 1:15:00PM COMPASS 5000.15 Build 90 Page 5 HEC Survey Report - Geographic Well 04-29Local Co-ordinate Reference:Hilcorp Alaska, LLCCompany: KB @ 60.00usft (04-29A OKB)TVD Reference:Prudhoe BayProject: KB @ 60.00usft (04-29A OKB)MD Reference:04Site: 04-29Well:TrueNorth Reference: Minimum CurvatureSurvey Calculation Method:04-29AWellbore: Design:04-29A Database:EDM_Master Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft)Latitude Longitude Survey Vertical Depth (usft) 13,315.46 89.32 8,814.32 -1,050.92 8,556.5994.67 721,923.065,950,817.55 70.26791870 -148.20525306 13,346.15 89.42 8,814.66 -1,053.43 8,587.1794.69 721,953.705,950,815.92 70.26791176 -148.20500578 13,376.97 89.44 8,814.97 -1,055.85 8,617.9094.35 721,984.485,950,814.36 70.26790503 -148.20475740 13,408.46 89.38 8,815.29 -1,058.28 8,649.2994.47 722,015.935,950,812.83 70.26789832 -148.20450358 13,439.83 88.79 8,815.79 -1,060.63 8,680.5794.15 722,047.265,950,811.36 70.26789178 -148.20425072 13,471.30 88.88 8,816.43 -1,063.07 8,711.9494.72 722,078.685,950,809.82 70.26788503 -148.20399711 13,502.67 88.88 8,817.05 -1,065.69 8,743.1994.87 722,110.005,950,808.08 70.26787777 -148.20374443 13,542.19 88.50 8,817.95 -1,070.35 8,782.4298.70 722,149.345,950,804.53 70.26786490 -148.20342732 13,581.81 90.30 8,818.36 -1,074.87 8,821.7694.40 722,188.805,950,801.13 70.26785243 -148.20310922 13,612.26 94.66 8,817.04 -1,074.27 8,852.1383.30 722,219.135,950,802.59 70.26785398 -148.20286374 13,643.80 93.70 8,814.74 -1,067.31 8,882.7471.10 722,249.535,950,810.42 70.26787289 -148.20261614 13,674.83 92.37 8,813.09 -1,054.21 8,910.7658.80 722,277.165,950,824.30 70.26790858 -148.20238949 13,706.37 92.64 8,811.70 -1,035.24 8,935.8447.00 722,301.705,950,843.98 70.26796033 -148.20218647 13,737.98 92.60 8,810.25 -1,011.59 8,956.6935.80 722,321.875,950,868.21 70.26802487 -148.20201767 13,770.34 90.43 8,809.40 -984.61 8,974.5231.10 722,338.925,950,895.68 70.26809852 -148.20187329 13,800.70 90.90 8,809.04 -958.78 8,990.4732.30 722,354.135,950,921.95 70.26816903 -148.20174407 13,870.00 90.90 8,807.96 -900.21 9,027.4932.30 722,389.485,950,981.54 70.26832892 -148.20144413 Vertical Depth (usft) Measured Depth (usft) Casing Diameter (") Hole Diameter (")Name Casing Points 13 3/8"2,544.00 2,502.02 13-3/8 17-1/2 9 5/8"10,174.00 7,170.77 9-5/8 12-1/4 7"12,628.00 8,826.24 7 8-1/2 4 1/2"13,870.00 8,807.96 4-1/2 6 Approved By:Checked By:Date: 12/15/2021 1:15:00PM COMPASS 5000.15 Build 90 Page 6 3URSHUW\'HVLJQDWLRQ /HDVH1XPEHU  2SHUDWLRQV 3HUIRUPHG 2SHUDWRU1DPH $GGUHVV :HOO&ODVV%HIRUH:RUN3HUPLWWR'ULOO1XPEHU $3,1XPEHU :HOO1DPHDQG1XPEHU /RJV /LVWORJVDQGVXEPLWHOHFWURQLFGDWDSHU$$& )LHOG3RRO V  $EDQGRQ 6XVSHQG 3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 3HUIRUDWH 3OXJ3HUIRUDWLRQV 5HHQWHU6XVS:HOO 2WKHU6WLPXODWH )UDFWXUH6WLPXODWH $OWHU&DVLQJ 3XOO7XELQJ 5HSDLU:HOO 2WKHU &KDQJH$SSURYHG3URJUDP 2SHUDWLRQVVKXWGRZQ 3UHVHQW:HOO&RQGLWLRQ6XPPDU\ &DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH $WWDFKPHQWV UHTXLUHGSHU$$&  :HOO6WDWXVDIWHUZRUN ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH 2,/ *$6 :,1- :$* *,1- :'63/ *6725 6XVSHQGHG 63/8* $XWKRUL]HG1DPHDQG 'LJLWDO6LJQDWXUHZLWK'DWH $XWKRUL]HG7LWOH &RQWDFW1DPH &RQWDFW(PDLO &RQWDFW3KRQH 3%8$ 2$'RZQVTXHH]H +LOFRUS1RUWK6ORSH//& &HQWHUSRLQW'U6XLWH$QFKRUDJH$.    &RQGXFWRU 6XUIDFH ,QWHUPHGLDWH /LQHU /LQHU                        1RQH              FU   6WUXFWXUDO +(67173DFNHUV  %R<RUN 6U$UHD2SHUDWLRQV0DQDJHU 2OLYHU6WHUQLFNL 2OLYHU6WHUQLFNL#KLOFRUSFRP  358'+2(%$<358'+2(2,/ 7RWDO'HSWK (IIHFWLYH'HSWK PHDVXUHG WUXHYHUWLFDO IHHW IHHW IHHW IHHW PHDVXUHG WUXHYHUWLFDO PHDVXUHG PHDVXUHG IHHW IHHW IHHW IHHW PHDVXUHG WUXHYHUWLFDO 3OXJV -XQN 3DFNHU 0HDVXUHGGHSWK 7UXH9HUWLFDOGHSWK IHHW IHHW 3HUIRUDWLRQGHSWK 7XELQJ VL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK 3DFNHUVDQG6669 W\SHPHDVXUHGDQGWUXHYHUWLFDOGHSWK 6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\ ,QWHUYDOVWUHDWHG PHDVXUHG  7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDO 5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD 2LO%EO *DV0FI :DWHU%EO &DVLQJ3UHVVXUH 7XELQJ3UHVVXUH 3ULRUWRZHOORSHUDWLRQ 6XEVHTXHQWWRRSHUDWLRQ :HOO&ODVVDIWHUZRUN ([SORUDWRU\ 'HYHORSPHQW 6HUYLFH 6WUDWLJUDSKLF'DLO\5HSRUWRI:HOO2SHUDWLRQV &RSLHVRI/RJVDQG6XUYH\V5XQ (OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD 6XQGU\1XPEHURU1$LI&2([HPSW $'/ %DNHU63DFNHU   LQ2$DW6XUIDFH 6TXHH]HJDOORQVRI:HOO/RFN6TXHH]HSUHVVXUH SVL            67$7(2)$/$6.$ $/$6.$2,/$1'*$6&216(59$7,21&200,66,21 5(32572)681'5<:(//23(5$7,216 6U3HW(QJ 6U3HW*HR )RUP5HYLVHG6XEPLW:LWKLQGD\VRU2SHUDWLRQV 6U5HV(QJ 1R6669,QVWDOOHG   By Samantha Carlisle at 2:28 pm, Dec 15, 2021 'LJLWDOO\VLJQHGE\%R<RUN '1FQ %R<RUNF 86R +,OFRUS $ODVND//&RX $ODVND1RUWK 6ORSHHPDLO E\RUN#KLOFRUSFRP 'DWH  %R<RUN DSR-12/15/21SFD 12/15/2021 RBDMS HEW 12/16/2021 17JAN2022 $&7,9,7<'$7(6800$5<  7,2 7HPS ƒ%OHHG2$3WRSVL SUHSIRU:HOORFN $/3  SVLRQOLQH2$3FHPHQWHGWRVXUIDFH%OHG2$3WR*0%IURPSVLWRSVL LQPLQ0DLQWDLQHGRSHQEOHHGIRUPLQ6,DQGPRQLWRUIRUPLQ2$3 LQFUHDVHGSVL)LQDO:+3V  69 &:966909 2,$2$ 27*  7,2 7HPS ƒ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ƒ+HDWHUZRUNLQJSURSHUO\6DPSOH QRWVHWXS2$3GHFUHDVHGSVLLQKUV 69:9 &66909 2,$2$ 27* 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8$ 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8$  7,2 6697HPS 6,:+3V SRVW:HOORFN $/3 SVL6,#&9 +HDWHUZRUNLQJSURSHUO\6+WHPS ƒ6DPSOHQRVHWXS2$3GHFUHDVHG SVLRYHUQLJKW 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V 3RVW:HOORFN $/3 SVL6,#&9 +HDWHUZRUNLQJSURSHUO\6+WHPS ƒ6DPSOHLVQRWVHWXS2$3GHFUHDVHG SVLVLQFHWKLVPRUQLQJ,QVWDOOHGJDVDFFXPXODWRURQ2$2$3QRZ SVL 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V 3RVW:HOORFN $/3 SVL6,#&9 +HDWHUZRUNLQJSURSHUO\6+WHPS ƒ6DPSOHLVQRWVHWXS 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V 3RVW:HOORFN $/3 SVL6,#&9 +HDWHUZRUNLQJSURSHUO\6+WHPS ƒ6DPSOHLVQRWVHWXS2$3GHFUHDVHG SVLIURP 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V 3RVW:HOORFN $/3 SVL6,#&9 +HDWHUZRUNLQJSURSHUO\6+WHPS ƒ6DPSOHLVQRWVHWXS2$3XQFKDQJHG RYHUQLJKW 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V SRVW:HOORFN $/3 SVL6,#&9 +HDWHULVZRUNLQJSURSHUO\6+WHPS ƒ$GMXVWHGKHDWHUWUXQN6DPSOHLVVHWXS DQGKDUG2$3GHFUHDVHGSVLRYHUQLJKW 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V 3RVW:HOORFN $/S SVL6,#&9 +HDWHUZRUNLQJ6+ ƒ6DPSOHLVVHWXS5HSUHVVXUHGJDVDFFXPXODWRU)LQDO :+3V 669 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V SRVW:HOORFN $/3 SVL6,#&9 +HDWHULVZRUNLQJSURSHUO\6+WHPS ƒ6DPSOHLVVHWXSDQGKDUG:+3V XQFKDQJHGRYHUQLJKW 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V 3RVW:HOORFN $/3 SVL6,#&9 +HDWHUZRUNLQJ6+WHPS ƒ6DPSOHLVVHWXS 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V SRVW:HOORFN $/3 SVL6,#&9 +HDWHULVZRUNLQJSURSHUO\6+WHPS ƒ6DPSOHLVVHWXSDQGKDUG 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V SRVW:HOORFN $/3 SVL6,#&9 +HDWHULVZRUNLQJSURSHUO\6+WHPS ƒ$GMXVWHGKHDWHUWUXQNDZD\IURP ZHOOKHDG:HOOKRXVHVDPSOHLVVHWXSDQGKDUG2IILFHVDPSOHLVKDUGEXWWDFN\ 69:9669 &09 2,$2$ 27*  7,2 6697HPS 6,:+3V 3RVW:HOORFN $/3 SVL6,#&9 +HDWHULVZRUNLQJSURSHUO\6+WHPS ƒ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ƒ:+3V HYDO7[,$ $/3 SVL$/RQOLQH 69 &:966909 2,$2$ 27*  7,2 7HPS ƒ:+3V (YDO,$[2$ $/RQOLQH:+3V XQFKDQJHGVLQFH 69 &:966909 2,$2$ 27*  7,2 7HPS ƒ:+3V SRVWZHOORFN $/3 SVLRQOLQH 2$FHPHQWHGWRVXUIDFH,$3LQFUHDVHGSVLDQG2$3XQFKDQJHGVLQFH 69 &:966909 2,$2$ 27*  :(//)/2:,1*21$55,9$/ '5,)7:; 68%6,'(1&('5,)772 6/0&/($1'5,)7 :(//)/2:,1*21'(3$5785(  7,2 7HPS ƒ:+3V SRVW:HOOORFN $/RQOLQH2$ FHPHQWHGWRVXUIDFH 69 &:966909 2,$2$ 27* From:Regg, James B (CED) To:AOGCC Records (CED sponsored) Subject:FW: OPERABLE: Producer 04-29A (PTD# 1951720) Well Lock remedied sustained OA casing pressure Date:Monday, October 11, 2021 9:36:16 AM Attachments:image001.png Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Sunday, October 10, 2021 9:29 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: OPERABLE: Producer 04-29A (PTD# 1951720) Well Lock remedied sustained OA casing pressure Mr. Regg, Producer 04-29A (PTD #1951720) was POP’d on 9/22/21 after the OA was down squeezed with Well Lock. Continued monitoring proved the Well Lock job has remedied the OA re-pressurization. The well is now classified back to OPERABLE. Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity / Compliance andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 From: Alaska NS - PB - Field Well Integrity Sent: Saturday, September 18, 2021 10:44 AM To: 'Regg, James B (CED)' <jim.regg@alaska.gov> Cc: 'Wallace, Chris D (CED)' <chris.wallace@alaska.gov>; Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com> Subject: UPDATE UNDER EVALUATION: Producer 04-29A (PTD# 1951720) Sustained Casing Pressure OA Mr. Regg, Producer 04-29A (PTD #1951720) 28 day clock is being reset. Wellock was pumped on 08/28/21, is fully cured and the well remains shut in for facility capacity at this time. The well remains UNDER EVALUATION and on the clock for an online monitoring period. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: Alaska NS - PB - Field Well Integrity Sent: Tuesday, July 27, 2021 11:12 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com> Subject: UNDER EVALUATION: Producer 04-29A (PTD# 1951720) Sustained Casing Pressure OA Mr. Regg, Producer 04-29A (PTD #1951720) was reported by operations to have sustained casing pressure outer annulus on 07/26/21. Pressure was confirmed to have reached 1010 psi over NOL. The pressure was bled and has stabilized near ~30 psi after the well was put on production. The outer annulus is cemented and it is suspected that gas leaked through cement when artificial lift pressure was applied to the IA in preparation to return the well to service after summer maintenance. The well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved. Plan Forward: 1. Downhole Diagnostics: PPPOT-IC, monitor OA build up 2. Operations Engineer: Wellock OA 3. Well Integrity: Further action as needed. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday, September 10, 2018 1:19 PM To: AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS FS2 DS Ops Lead <AKOPSFS2DSOpsLead@bp.com>; AK, OPS FS2 Facility OTL <AKOPSFS2FacilityOTL@bp.com>; AK, OPS FS2 Field OTL <AKOPSFS2FieldOTL@bp.com>; AK, OPS FS2 OSM <AKOPSFS2OSM1@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; AK, OPS Pipeline Compl Specialist <AKOPSPipelineComplSpecialist@bp.com>; AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; G GPB FS2 Drillsites <ggpbfs2drillsites@BP.com>; Nottingham, Derek <Derek.Nottingham@bp.com>; Ohms, Danielle H <Danielle.Ohms@bp.com>; Richards, Meredyth <Meredyth.Richards@bp.com>; Stechauner, Bernhard <Bernhard.Stechauner@bp.com>; Summers, Matthew <Matthew.Summers@bp.com> Cc: AK, GWO Completions Well Integrity <AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO Projects Well Integrity <AKDCProjectsWellIntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dempsey1@bp.com>; Dickerman, Eric <Eric.Dickerman@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Romo, Louis A <Louis.Romo@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com> Subject: OPERABLE: Producer 04-29A (PTD# 1951720) passed warm TIFL All, Producer 04-29A (PTD #1951720) was placed under evaluation on 09/04/18 after it failed a cold TIFL. On 09/09/18 DHD performed a warm TIFL that passed. The passing TIFL indicates two competent well barriers to formation. The well is now classified as OPERABLE. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization – Alaska Office: 907-659-8110 From: AK, GWO Well Integrity Engineer Sent: Tuesday, September 4, 2018 8:33 AM To: AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS FS2 DS Ops Lead <AKOPSFS2DSOpsLead@bp.com>; AK, OPS FS2 Facility OTL <AKOPSFS2FacilityOTL@bp.com>; AK, OPS FS2 Field OTL <AKOPSFS2FieldOTL@bp.com>; AK, OPS FS2 OSM <AKOPSFS2OSM1@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; AK, OPS Pipeline Compl Specialist <AKOPSPipelineComplSpecialist@bp.com>; AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; G GPB FS2 Drillsites <ggpbfs2drillsites@BP.com>; Nottingham, Derek <Derek.Nottingham@bp.com>; Ohms, Danielle H <Danielle.Ohms@bp.com>; Richards, Meredyth <Meredyth.Richards@bp.com>; Stechauner, Bernhard <Bernhard.Stechauner@bp.com>; Summers, Matthew <Matthew.Summers@bp.com> Cc: AK, GWO Completions Well Integrity <AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO Projects Well Integrity <AKDCProjectsWellIntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dempsey1@bp.com>; Dickerman, Eric <Eric.Dickerman@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Romo, Louis A <Louis.Romo@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com> Subject: UNDER EVALUATION: Producer 04-29A (PTD# 1951720) Failed cold TIFL All, Producer 04-29A (PTD# 1951720) was identified as having an anomalous inner annulus pressure trend on 8/29/18 and failed a cold TIFL on 8/31/2018. The failed TIFL indicates a loss of one or more well barriers. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repair. Plan forward: 1. OPS – POP well 2. DHD – Warm TIFL 3. Well Integrity Engineer – Additional diagnostics as needed Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 From:Regg, James B (CED) To:AOGCC Records (CED sponsored) Subject:FW: UPDATE UNDER EVALUATION: Producer 04-29A (PTD# 1951720) Sustained Casing Pressure OA Date:Monday, September 20, 2021 9:32:39 AM Attachments:image001.png Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com> Sent: Saturday, September 18, 2021 10:44 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com> Subject: UPDATE UNDER EVALUATION: Producer 04-29A (PTD# 1951720) Sustained Casing Pressure OA Mr. Regg, Producer 04-29A (PTD #1951720) 28 day clock is being reset. Wellock was pumped on 08/28/21, is fully cured and the well remains shut in for facility capacity at this time. The well remains UNDER EVALUATION and on the clock for an online monitoring period. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: Alaska NS - PB - Field Well Integrity Sent: Tuesday, July 27, 2021 11:12 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Aras Worthington <Aras.Worthington@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com> Subject: UNDER EVALUATION: Producer 04-29A (PTD# 1951720) Sustained Casing Pressure OA Mr. Regg, Producer 04-29A (PTD #1951720) was reported by operations to have sustained casing pressure outer annulus on 07/26/21. Pressure was confirmed to have reached 1010 psi over NOL. The pressure was bled and has stabilized near ~30 psi after the well was put on production. The outer annulus is cemented and it is suspected that gas leaked through cement when artificial lift pressure was applied to the IA in preparation to return the well to service after summer maintenance. The well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved. Plan Forward: 1. Downhole Diagnostics: PPPOT-IC, monitor OA build up 2. Operations Engineer: Wellock OA 3. Well Integrity: Further action as needed. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday, September 10, 2018 1:19 PM To: AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS FS2 DS Ops Lead <AKOPSFS2DSOpsLead@bp.com>; AK, OPS FS2 Facility OTL <AKOPSFS2FacilityOTL@bp.com>; AK, OPS FS2 Field OTL <AKOPSFS2FieldOTL@bp.com>; AK, OPS FS2 OSM <AKOPSFS2OSM1@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; AK, OPS Pipeline Compl Specialist <AKOPSPipelineComplSpecialist@bp.com>; AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; G GPB FS2 Drillsites <ggpbfs2drillsites@BP.com>; Nottingham, Derek <Derek.Nottingham@bp.com>; Ohms, Danielle H <Danielle.Ohms@bp.com>; Richards, Meredyth <Meredyth.Richards@bp.com>; Stechauner, Bernhard <Bernhard.Stechauner@bp.com>; Summers, Matthew <Matthew.Summers@bp.com> Cc: AK, GWO Completions Well Integrity <AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO Projects Well Integrity <AKDCProjectsWellIntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dempsey1@bp.com>; Dickerman, Eric <Eric.Dickerman@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Romo, Louis A <Louis.Romo@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com> Subject: OPERABLE: Producer 04-29A (PTD# 1951720) passed warm TIFL All, Producer 04-29A (PTD #1951720) was placed under evaluation on 09/04/18 after it failed a cold TIFL. On 09/09/18 DHD performed a warm TIFL that passed. The passing TIFL indicates two competent well barriers to formation. The well is now classified as OPERABLE. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization – Alaska Office: 907-659-8110 From: AK, GWO Well Integrity Engineer Sent: Tuesday, September 4, 2018 8:33 AM To: AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS FS2 DS Ops Lead <AKOPSFS2DSOpsLead@bp.com>; AK, OPS FS2 Facility OTL <AKOPSFS2FacilityOTL@bp.com>; AK, OPS FS2 Field OTL <AKOPSFS2FieldOTL@bp.com>; AK, OPS FS2 OSM <AKOPSFS2OSM1@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; AK, OPS Pipeline Compl Specialist <AKOPSPipelineComplSpecialist@bp.com>; AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; G GPB FS2 Drillsites <ggpbfs2drillsites@BP.com>; Nottingham, Derek <Derek.Nottingham@bp.com>; Ohms, Danielle H <Danielle.Ohms@bp.com>; Richards, Meredyth <Meredyth.Richards@bp.com>; Stechauner, Bernhard <Bernhard.Stechauner@bp.com>; Summers, Matthew <Matthew.Summers@bp.com> Cc: AK, GWO Completions Well Integrity <AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO Projects Well Integrity <AKDCProjectsWellIntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dempsey1@bp.com>; Dickerman, Eric <Eric.Dickerman@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Romo, Louis A <Louis.Romo@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com> Subject: UNDER EVALUATION: Producer 04-29A (PTD# 1951720) Failed cold TIFL All, Producer 04-29A (PTD# 1951720) was identified as having an anomalous inner annulus pressure trend on 8/29/18 and failed a cold TIFL on 8/31/2018. The failed TIFL indicates a loss of one or more well barriers. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repair. Plan forward: 1. OPS – POP well 2. DHD – Warm TIFL 3. Well Integrity Engineer – Additional diagnostics as needed Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:195-172 6.API Number:50-029-21453-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 0028324 Property Designation (Lease Number):10. 8. PBU 04-29A 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations …Fracture Stimulate …Repair Well … Operations shutdown OA Down Squeeze … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 13870 Effective Depth MD: 13Cr80 11. 8/15/21 Commission Representative: 15. Suspended … Contact Name: Oliver Sternicki Contact Email: Oliver.Sternicki@hilcorp.com Authorized Name: Torin Roschinger Authorized Title:Sr Operations Engineer Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8808 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill …Perforate …Perforate New Pool 9834 , 12006 , 12168 6983 , 8549 , 8667 Date: Liner 12616 4-1/2" 12541 - 13870 8889 - 8877 8430 7500 Well Status after proposed work: 16. Verbal Approval: … … …Change Approved Program 27 - 2550 27 - 2511 14. Estimated Date for Commencing Operations: BOP Sketch 31 - 111 Structural 6870 Proposal Summary 13. Well Class after proposed work: 4-1/2" HES TNT Perm 12236 - 13827 8709 - 8809 4-1/2" 12.6#26 - 12254 Liner 12425 8796 12192 none 31 - 111 470 13-3/8" 9-5/8" Contact Phone:(907)564-4891 Date: 7/30/2021 4760 80 149020"Conductor 1950 …GINJ 5 Post Initial Injection MIT Req'd? Yes No … 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 2523 3450 Intermediate 10213 26 - 10239 26 - 7279 2669 7"9959 - 12628 7118 - 8895 8160 7020 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. By Meredith Guhl at 10:34 am, Jul 30, 2021 321-383 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), c=US, o=Hilcorp North Slope, LLC, ou=Prudhoe Bay East, email=Torin.Roschinger@hilcorp.com Date: 2021.07.30 10:08:16 -08'00' Torin Roschinger (4662) 10-404 DSR-8/2/21MGR30JUL2021 SFD 7/30/2021 SFD 7/30/2021 8876  dts 8/2/2021 JLC 8/2/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.08.02 14:28:21 -08'00' RBDMS HEW 8/3/2021 OA WellLock Squeeze Well: 04-29A PTD: 195172 API: 50-029-21453-01 Well Name: 04-29A Permit to Drill Number: 195172 Well Type PAL API Number: 50-029-21453-01 Job Scope: OA WellLock Squeeze Reg.Approval Req’d? Yes Current Status: Under Eval, Online Date Reg. Approval Rec’vd: 8/11/2021 Estimated Start Date: 8/15/2021 Estimated Duration: 2 day Regulatory Contact: Mel Rixie First Call Engineer: Oliver Sternicki Second Call Engineer: Torin Roschinger Brief Well Summary: 04-29 is a gas lifted producer which has recently began exhibiting rapid OA repressurization not manageable by bleed. The OA was fully cemented during a RWO in 2010. The OA does not repressurize when the well is online, but does when the well is shut-in. CMIT-TxIA passed to 1970 psi on 12/13/2012. A cold TIFL passed on 7/12/2021. Current Status: 04-29 is currently under evaluation starting 07/27/2021. Scope of Work: Squeeze OA with Well Lock (or similar) to mitigate intermittent OA re-pressurization. Procedure: 1 DHD PPPOT-IC Begin Sundry Work 1 Valve Shop ND OA GATE VALVE, NU OA INTEGRAL 2 DHD STRAP TOC. TOP OA WITH CEMENT AS NEEDED. WELL LOCK OA SQUEEZE 3 Special Projects A/DHD WELL LOCK SQUEEZE 4 DHD POP U/E, MONITOR FOR OA RE-PRESSURIZATION 5 Valve Shop ND OA INTEGRAL, NU OA GATE VALVE 6 DHD RE-SQUEEZE OA WITH WELL LOCK IF NECESSARY. OA WellLock Squeeze Well: 04-29A PTD: 195172 API: 50-029-21453-01 API No. 50-029-21453-60 4 STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISSI. • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waived] Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate Q Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development El Exploratory ❑ • 195 -1720 3. Address: P.O. Box 196612 Stratigraphic El Service ❑ 6. API Number: Anchorage, AK 99519 -6612 ' 50- 029 - 21453 -01 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 028324 t PBU 04 -29A 10. Field /Pool(s): • PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 13870 feet Plugs (measured) None feet true vertical 8876.69 feet AA ED MAR 0 jnk asured) None feet Effective Depth measured 13870 feet Packer (measured) 9977 12006 12168 12541 feet true vertical 8876.69 feet (true vertical) 7128 8617 8736 8889 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 20" 91.5# H -40 28 - 120 28 - 120 1490 470 Surface 13- 3/8 "68# K -55 27 - 84 27 - 84 3450 1950 Surface 13- 3/8 "72# L -80 84 - 2550 84 - 2511 5380 2670 Production 9 -5/8" 47# L -80 26 - 10239 26 - 7279 6870 4760 Liner 7" 29# L -80 9959 - 11833 7118 - 8487 8160 7020 Liner 7" 29# 13CR80 11833 - 12628 8487 - 8895 8160 7020 Liner 4 -1/2" 12.6# 13CR80 12541 - 13870 8889 - 8877 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ - _ Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13Cr80 24 - 12254 24 - 8788 Packers and SSSV (type, measured and true vertical depth) 9 -5/8" X 7" TIW HLP PKR 9977 7128 7" X 4 -1/2" HES TNT PKR 12006 8617 7" X 4 -1/2" BKR S -3 PKR 12168 8736 7 "X4 -1/2 "TIW SS PKR RECEI _'`. • 8889 12. Stimulation or cement squeeze summary: Intervals treated (measured): MAR 0 3 2011 Treatment descriptions including volumes used and final pressure: Oka Oil & { 6as g C r o o ns. Commission 13. Representative Daily Average I�Yti t]L't S% Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 46 144 3301 219 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development IE * Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil • 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Nanhe Jo Lastu Title Data Manager Signatu e Phone 564 -4091 Date 3/3/2011 Form 10-404 Revised /2010 R ©cus MAR V 0 Z0 � 3. y. /( Submit Original Only �7 Rltu[ ` .7/7( � 04-29A I'7 — PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 04 -29A 12/25/95 SL 12,628. 13,827. 8,894.96 8,877.37 04 -29A 5/16/96 APF 12,492. 12,530. 8,881.31 8,887.65 04 -29A 11/18/00 OH 12,482. 12,488. 8,879.3 8,880.53 04 -29AL1 11/24/00 SL 12,968. 13,886. 8,878.56 8,860.79 04 -29A 5/15/05 APF 12,286. 12,296. 8,805. 8,810.09 04 -29A 5/15/05 APF 12,250. 12,260. 8,785.92 8,791.33 04 -29A 6/3/05 APF 12,236. 12,250. 8,778.18 8,785.92 04 -29A 8/24/07 BPS 12,176. 13,886. 8,741.16 8,876.44 04 -29A 4/16/10 SPS 12,145. 12,176. 8,719.53 8,741.16 04 -29A 5/9/10 BPP 12,176. 13,888. 8,741.16 8,876.41 04 -29A 5/9/10 SPR 12,145. 12,176. 8,719.53 8,741.16 04 -29A 2/22/11 APF 12,393. 12,403. 8,853.66 8,857.19 • 04 -29A 2/28/11 APF 12,373. 12,383. 8,846.07 8,849.97 04 -29A 2/28/11 APF 12,383. 12,393. 8,849.97 8,853.66 04 -29A 3/1/11 APF 12,363. 12,373. 8,841.95 8,846.07 04 -29A 3/1/11 APF 12,360. 12,363. 8,840.68 8,841.95 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO - FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • • 4 -2 0 9A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 2/22/2011 !***WELL FLOWING ON ARRIVAL * ** (E -LINE PERF) INITIAL T /I /O = 650/2000/100 PSI INITIAL VALVE POSITIONS: WING= OPEN, SSV: OPEN, MASTER: OPEN, SWAB: CLOSED, GAUGES OPEN TO WELL. PERFORATE 12393' - 12403' WITH 2" HSD PJO 2006 HMX, 6 SPF, 60 DEG PHASE TIED INTO SLB PERF RECORD DATED 3- JUN -2005 FINAL T /I /O = 650/2000/100 PSI !FINAL VALVE POSITIONS: WING= CLOSED, SSV: OPEN, MASTER: OPEN, !SWAB: CLOSED, GAUGES OPEN TO WELL. 1 ** *JOB IN PROGRESS AND CONTINUED ON 23- FEB- 2011 * ** 2/23/2011 ** *WELL FLOWING ON ARRIVAL, JOB CONTINUED FROM 22- FEB - 2011 * ** (E- !LINE PERF) =INITIAL T /I /O = 650/2000/100 PSI [ INITIAL VALVE POSITIONS: WING= OPEN, SSV: OPEN, MASTER: OPEN, SWAB: CLOSED, GAUGES GAUGES OPEN TO WELL. RIGGED UP ON WELL, BUT OPERATION WAS SHUT DOWN DUE TO INCREASING HIGH WINDS. NO RUNS COMPLETED FINAL TWO = 650/2000/100 PSI FINAL VALVE POSITIONS: WING= OPEN, SSV: OPEN, MASTER: OPEN, SWAB: CLOSED, GAUGES OPEN TO WELL. ** *JOB IN PROGRESS AND CONTINUED ON 24- FEB- 2011 * ** 2/28/2011, **WELL FLOWING ON ARRIVAL- JOB CONTINUED FROM 23- FEB - 2011 * * *(ELINEI PERF) INITIAL T /I /O= 300/1500/100 PSI !INITIAL VALVE POSITIONS: SWAB= CLOSED, MASTER/WING /SSV /CASING GAUGES= OPEN RUN 2- PERFORATE 12383' - 12393' WITH 2" HSD PJO 2006 HMX, 6 SPF, 60 DEG 1 PHASE RUN 3- PERFORATE 12373'- 12383' WITH 2" HSD PJO 2006 HMX, 6 SPF, 60 DEG PHASE TIED INTO SLB PERF RECORD DATED 3- JUN -2005 FINAL T /I /O= 950/1500/100 PSI FINAL VALVE POSITIONS: SWAB= CLOSED, MASTER/WING /SSV /CASING GAUGES= OPEN ** *JOB IN PROGRESS AND CONTINUED ON 1- MAR - 2011 * ** • • • 3/1/2011 ***WELL FLOWING ON ARRIVAL- JOB CONTINUED FROM 28- FEB- 2011 * **(ELINE PERF) !INITIAL T /I /O= 350/1500/100 PSI !INITIAL VALVE POSITIONS: SWAB= CLOSED, MASTERNVING /SSV /CASING !GAUGES= OPEN !RUN 4- PERFORATE 12363- 12373' WITH 2" HSD PJO 2006 HMX, 6 SPF, 60 DEG PHASE !RUN 5- PERFORATE 12360- 12363' WITH 2" HSD PJO 2006 HMX, 6 SPF, 60 DEG I PHASE !TIED INTO SLB PERF RECORD DATED 3- JUN -2005 FINAL T /I /O= 900/1600/100 PSI [ !FINAL VALVE POSITIONS: SWAB= CLOSED, MASTER/WING /SSV /CASING !GAUGES= OPEN ** *JOB COMPLETE * ** _...._...�_ .... _ ._...._ FLUIDS PUMPED BBLS 6 DIESEL 5 METH 11 TOTAL TIT EE= HORIZONTAL WELLHEAD = FMC 04 -29A 112419' *L TIROMEETBG & LNR's WELL ' ORIG WELLBORE KB EL 60' = 60' R'= O KB. ELEV AL 1 NOT SHOWN BELOW 04 -29A MILLOUT WINDOW * ** BF. ELEV _ 13 -3/8" CSG, 81' a' . ♦+i 1818' - 19 -5/8" HES ES CEMENTER I KOP 1875' 68 #, L-80 BTC, Angle = 95° @ 13612' Max t. 1840' I - 113 - 3/8" x 9 -5/8" BKR ISO -ZONE ECP, ID = 8.70" 1 ID =12.415" .i 1 Datum MD = 12412' • ∎ • i 2,115' H4-1/2" HES X NIPPLE, ID = 3.813" 1 Datum TVD = 8800' SS •� i' 120" CONDUCTOR, 91.5 #, H-40, ID = 19.124" 1- 120' :4 1■ GAS LIFT MANDRELS ST MD TVD DEV TYPE V LV LATCH PORT DATE 19-5/8" CSG , 47 #, L -80 HYD 563, ID= 8.681" H 1861' I 3 3893 3511 52 MMG DOME RK PORT 11/25/10 19 -5/8" BOWEN CSG PATCH ,ID= 9.610" I-1 1865' I 2 7317 5505 53 MMG DOME RK 22 11/25/10 1 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2550' 1 9610 6926 56 MMG SO RK 0 11/25/10 Minimum ID = 2.37" @ 12202' omit iii-m. -14-1/2" HES X NIPPLE ID = 3.813" 1 4-1/2" GS FN 9832' H9-5/8" x 4-1/2" HES TNT PKR, ID = 3.903" 1 19 -5/8" X 7" TM/ HLP PKR, ID = 6.184" H 9977' f /1 9-5/8" MILLOUT WINDOW (04 -29A) 10174' - 10239' 19 -5/8" X 7" TM! DTH HGR, ID = 6.113" H 9982' 1 9 -5/8" CSG, 47 #, L -80 BTC, ID = 8.681" H 10174' 1 " 1 11977' H4 -1/2" HES X NIPPLE, ID = 3.813" 1 7" LNR, 29 #, L -80 NSCC XO TO 13CR -80 NSCC H 11833' s�4 X 1 12006' 1-17" x 4 -1/2" HES TNT PKR, ID = 3.856" 1 i 1 12041' H4 -1/2" HES X NIPPLE, ID = 3.813" 1 4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, - 12122' 1 12111' - 14 -1/2" HES XN NIPPLE, ID = 3.725" I .0152 bpf, ID = 3.958" 14 -1/2" TBG STUB (05/05/10) 1 12127' 1 12137' - 17" X 4-1/2" UNIQUE OVERSHOT � -2 $ --I 12168' - 17" X 4 -1/2" BKR S -3 PKR, ID = 3.875" 1 (TOP OF 2 -7/8" LNR 1-1 12203' I 1 12203' --I -3/4" BKR DEPLOY SLV, ID = 3.00" 1 17" MARKER JOINT I-I 12220' 12208' - 13 -3/4" X 2 -7/8" XO PIN, ID = 2.441 1 4 -1/2" TBG, 12.6#, 13CR -80 NSCT, - 12254' i 1 12241' - 14 -1/2" HES X NIP, ID = 3.813" (B®IIND LNR) 1 .0152 bpf, ID = 3.958" 1 FLOW -THRU WHIPSTOCK (11/18/00) H 12488' 12254' - 14 - 1/2" WLEG (BEHIND LNR) 1 PERFORATION SUMMARY REF LOG: BHCS 12/01/95 ANGLE AT TOP PERF; 56° @ 12236' 7" MILLOUT WINDOW (04- 29AL1) 12482' - 12488' Note: Refer to Production DB for historical perf data III SIZE SPF ZONE INTERVAL Opn /Sqz DATE 2" 6 23P 12236 - 12250 0 06/03/05 2" 6 " 12250 - 12260 0 05/15/05 2" 6 " 12286 - 12296 0 05/15/05 3 -3/8" 4 14P 12492 - 12530 0 05/16/96 4 -1/2" SLTD " 12628 - 13827 SLOT 12/18/95 • 2 -7/8" SLTD " 12968 - 13886 SLOT 11/24/00 • . • I. • 04 7" X 4-1/2" TIW SS PKR w / XO, ID = 3.923" 1 - 1 12541' I I 13888' - PBTD I ( 1 2 - 7/8" LNR, - 1 12968' I ' . , ' . , 1 7" LNR, 29 #, 13CR -80, .0371 bpf, ID = 6.184" 1 - 1 12628' ' 1 L -80 STL, 6.16 #, • 14 -1/2" LNR, 12.6 #, 13CR NSCT, .0152bpf, ID = 3.958" 1 - I 12628' .0058 bpf, ID = 2.441" • , 0I4-29A 2 -7/8" SLID LNR, 6.16 ", L -80, 13886' 4-1/2" SLTD LNR, 12.6 #, 13CR NSCT, - L13827' I 0058 bpf, ID = 2.441" .0152bpf, ID = 3.958" J L 2-7/8" LNR, 6.16 #, L -80 STL, 13922' 14 -1/2" LNR, 12.6 #, 13CR NSCT, .0152bpf, ID = 3.958" 1-1 13870' 1 .0058 bpf, ID = 2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/14/85 PKR 191 ORIGINAL COM PLET'ION 06/29/10 CSR/PJC GLV DATE CORRECTION WELL: 04 -29AL1 04/17/86 WW1 RWO 08/13/10 PJC DRLG DRAFT CORRECTIONS PERMIT No: 2001780 12/25/95 N2ES SIDETRACK (04-29A) ' 09/29/10 HB /PJC FINAL DRLG CORRECTIONS API No: 50- 029 - 21453 -60 11/25/00 NOR 1 CTD SDTRACK (04- 29AL1) 12/06/10 JLJ /PJC GLV C/0 (11/25/10) SEC 35, T11N, R15E, 261' FNL & 503' FWL 05/13/10 D141 RWO 05/18/10 RCT /SV GLV C/O (05/16/10) i BP Exploration (Alaska) STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERA~ONS ~~~Eiv~a J!~N 1 0 2010 tl9..nlin hiI S'~ f`nr f wnc rMMM'M~QQIArM 1. Operations Performed: ~~~ Rr3~ ~' ' ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re VV -Enter Suspende e ® Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: .Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 195-172 3. Address: ^ Service ^ Stratigraphic .API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21453-01-00 7. Property Designation: 8. Well Name and Number: \ ~ ADL 028324 PBU 04-29A 9. Field /Pool(s): ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 13870' feet true vertical 8877' feet Plugs (measured) None Effective depth: measured 13870' feet Junk (measured) None true vertical 8877' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 120' 20" 120' 120' 1490 470 Surface 2550' 13-3/8" 2550' 2511' 3450 1950 Intermediate 10174' 9-5/8" 10174' 7240' .6870 4760 Production Liner 2659' 7" 9969' - 12628' 7124' - 8895' 8160 7020 Liner 1329' 4-1/2" 12541' - 13870' 8889' - 8877' 8430 7500 Perforation Depth: Measured Depth: 12492' - 13827' ~~ , ~.'`' ~;1 ~ ° :`~ .~ ~ L ~ ^~ ~ ~ ~ True Vertical Depth: 8881' - 8877' Tubing (size, grade, measured and true vertical depth): 4-1/2", 12.6# 13Cr80 12254' 8788' Packers and SSSV (type, measured and true vertical depth): 9-5/8" x 4-1/2" HES'TNT' packer; 9832' 7049' 7" x 4-1/2" HES 'TNT' packer; 12006' 8617' 7" x 4-1/2" Baker'S-3' packer 12168' 8736' 11. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut, pull and dress tubing to _12127. Cut, pull and dress 9-5/8" Casing to 1863'. Run 9-5/8" Tieback to 1865'. Cement w/ 135 Bbls Class'G' (Yield 1.17). Run new completion. 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 252 6,666 4.071 1,314 213 13. Attachments: ^ Copies of Logs and Surveys run • Well Class after work: ^ Exploratory ®Development ^ Service erations ® Dail Re ort of Well O y p p ® Well Schematic Diagram Well Status after work: ®Oil ^ Gas ^ WDSPL ^ GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Hank Baca, 564-5444 310-114 Printed Name Terrie Hubble Title Drilling Technologist 1~ v Prepared By NameMumber: - Signatur Phone 564-4628 Date V [ ~ b Terrie Hubble, 564-4628 Form 10-404 Revised 07/2009 R~DAAS JUN ,L 1 L{f~ 1/ Submit Original Only '` l3~ 04-29A & 04-29AL1, Well History (Pre Rig Workover) Date Summary 4/16/2010 WELL S/I ON ARRIVAL. TAGGED WRP C~ 12154' SLM W/ 3.805" G-RING. DUMPED 2 BAGS OF SLUGGITS ON WRP; TOP OF SLUGGITS -12145' SLM. SET JUNK CATCHER ON SLUGGITS ~ 12142' SLM. JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED. 4/17/2010 T/I/0=1250/950/950, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS), pre RWO. PPPOT-T: Stung into test port (0+ psi), bled to 0 psi. Functioned LDS (standard), all moved freely (1.5"). Pressured void to 5000 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port (20 psi), bled to 0 psi. Functioned LDS (ET style), all moved freely (1 "). Pressured void to 3500 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. 4/17/2010 T/I/0=1300/960/960 Temp= S/I MIT-TBG PASSED to 3500 psi, MIT-IA PASSED to 1000 psi. Pumped 2.9 bbls crude down TBG to reach test pressure. TBG lost 120 psi in the 1st 15 mins and 40 psi in the 2nd 15 mins for a total loss of 160 psi during the 30 min test. Bled TBG psi (2.7 bbls, all fluid); MIT-IA to 1000 psi. Pumped 0.4 bbls crude down IA to reach test pressure. IA lost 10 psi in the 1st 15 mins and 10 psi in the 2nd 15 mins, ran test for an addtional 15 min with a 0 psi loss on the IA, monitored for additional 30 min with 0 psi loss on the IA. Bled IA psi (1.5 bbls). 4/17/2010 T/I/O = 1300/970/970. Temp = SI. TBG FL. AL spool piece is dropped. TBG FL is near surface. 4/18/2010 WELL SHUT IN ON ARRIVAL. INITIAL T/I/0=700/320/200 PSI. RIH WITH 3.65" POWER CUTTER. 4/18/2010 MIT-OA PASSED to 1000 psi (RWO). MIT-OA to 1000 psi Passed on 2nd attempt. Pumped 1 bbls crude down OA to reach test pressure. OA lost 20 psi in the 1st 15 mins and 10 psi in the 2nd 15 mins for a total loss of 30 psi during the 30 min test. Bled OA psi (1 bbls) FWHPs = 700/320/80 4/18/2010 WELL SHUT IN ON ARRIVAL. INITIAL T/I/0=700/320/200 PSI. CUT 4.5" TUBING AT 12128' WITH 3.65" POWER CUTTER. 4/19/2010 T/I/0=100/100/120 Circ Out Well (RWO Prep). Pumped into Tbg w/ 5 bbl meth spear, 80 bbls 1%KCL taking returns up IA through jumper to FL. 4/19/2010 CUT 4.5" TUBING AT 12128' WITH 3.65" POWER CUTTER. RIG DOWN E-LINE. FINAL T/I/O = 400/400/200 PSI. JOB COMPLETE. 4/20/2010 T/I/O=0/0/0 Set 6-3/8" CIW "J" BPV #416 thru tree for Doyon 141 pre-rig, 1-2' ext. used, tagged C~ 102", No Problems. 4/20/2010 Circ-Out Well. Pumped a total of 1173 bbls 1 %KCL down Tbg taking returns up la to FL. Freeze protected w/ 137 bbls diesel. U-Tube Diesel into tA. CMIT Tx IA to 500 psi. Passed. Lost 20 psi in first 15 minutes & 20 psi in second 15 minutes. Bleed tbg & IA pressure down to 0 psi. Freeze protect FL w/ 5 bbls neat meth & 33 bbls crude. FWHP=O/0/0. Page 1 of 1 i • North America -ALASKA - BP Page 1 of z Operation Summary Report Common Well Name: 04-29 DIMS j AFE No Event Type: MOBILIZATION (MOB) Start Date: 4/24/2010 ~ End Date: 4/28/2010 ;X4-OOPPJ-E (450,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/21/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ _ 4/24/2010 02:30 - 08:30 6.00 MOB P PRE MOVE RIG 141 SUB, ROCKWASHER AND i 2-PIPESHED MODULES FROM MILNE POINT ~ CUTOFF TO DS 4. __ _ 08:30 12:00 3.50 MOB P __ PRE SPOT SUB OVER WELL 04-29AL1 AND SHIM IN PLACE. 12:00 - 16:00 4.00 MOB P PRE SPOT'PITS, MUD PUMP, POWER, BOILER AND TWO PIPE SHED MODULES. SPOT ROCKWASHER. _ 16:00 - 17:00 _ 1.00 MOB P PRE __ HOLD APT WITH FS-2 OTL, DS-4 PAD OPS, DOYON TOOLPUSHERS AND SAFETY, ALONG WITH BP WSL'S AND-BP SAFETY. 17:00 - 00:00 7.00 MOB P PRE BEGIN WORK ON REMOVING THE DEAD MAN, i REPLACE THE PAD EYES, FINISH WORK ON THE i MUD PUMPS, AND OTHER MISC. HOPKINS AUDIT ~ ISSUES. 4/25/2010 __ 00:00 - 06:00 _ _ 6.00 MOB P _ PRE WORK ON REMOVING THE DEAD MAN ANCHOR, REMOVE THE PAD EYES, FINISH WORK ON THE MUD PUMPS, AND OTHER MISC. HOPKINS AUDIT ISSUES. - --------- 06:00 - 12:00 6.00 MOB P 'PRE REMOVE AND PREPARE THE DEAD MAN ANCHOR AND ELEVATOR BALES FOR INSPECTION. ALSO, PREPARE THE LIFTING EYES, SLIPS AND ELEVATORS FOR INSPECTION. LOAD TEST FLUID END LIFTING DEVICE IN THE PUMP ROOM AND KOOMEY ROOM. WORK ON i MISC. PROJECTS ADDRESSING THE HOPKINS _~ ___ __ -~ __ AUDIT. _ 12:00 - 18:00 I 6.00 MOB P PRE ~ HAVE THE DEAD MAN ANCHOR INSPECTED, GOOD. RECEIVE AND OFF-LOAD DRILL PIPE AND MUD PRODUCTS. INSTALL DOOR ~ ~ CLOSURE IN PIT ROOM AND CENTRIFUGAL ~ ROOM. REMOVE KOOMEY VALVE AND REPLACE WITH A STRAIGHT PIECE OF PIPE. ~ CLEAN OUT THE PUMP SUCTIONS. INSTALLED '~ NEW SEAL ON DRILLERS PANEL TO FIX THE PURGE PROBLEM. REPLACED THE BRIDGE CRANE CONTROLLER. WORK ON MISC. PROJECTS ADDRESSING THE HOPKINS AUDIT. __ 18:00 - 00:00 6.00 MOB ~ P PRE RE-INSTALL THE DEAD MAN ANCHOR AND i I PREPARE TO SLIP AND CUT DRILLING LINE. CONTINUE TO REMOVE PAD EYES AROUND THE RIG. WORK ON MISC. PROJECTS ADDRESSING ~ THE HOPKINS AUDIT. Printed 6/9/2010 11:05:33AM North America -ALASKA - BP ~'~?~ "~ of =' Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: MOBILIZATION (MOB) ~ Start Date: 4/24/2010 End Date: 4/28/2010 X4-OOPPJ-E (450,000.00 ) I Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/21/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4126/2010 00:00 - 12:00 ~ 12.00 MOB P PRE REMOVE PAD EYES AROUND THE RIG. WORK ~ i ~ ON MISC. PROJECTS ADDRESSING THE HOPKINS AUDIT. SLIP AND CUT 11T OF DRILLING LINE. ~ SERVICE THE TOP DRIVE AND DRAW WORKS. CHANGE OUT THE HOPPER LINE IN THE ROCK j WASHER. PERFORM 4 POINT DERRICK ~ INSPECTION. REMOVE DERRICK PULL OVER i LINE. INSTALL DOOR SEAL ON DOG HOUSE DOOR. 12:00 - 00:00 12.00 MOB P PRE INSTALL DOOR CLOSURES ON THE DOG HOUSE TO ARCTIC ENTRY AND IN THE PITS. REMOVE BRAKE HANDLE AND-LINKAGE ASSEMBLY AND TRANSPORT TO TUBOSCOPE FOR INSPECTION. ~ REMOVE PAD EYES. WORK ON HOPKINS AUDIT _ _ __ ) FINDINGS,. ____ 4/27/2010 00:00 - 12:00 12.00 MOB P PRE WORK ON HOPKINS AUDIT ISSUE AND ORGANIZE HANDLING EQUIPMENT FOR UPCOMING OPERATIONS. PAINT CHICKSANS S AND VALVES. CLEAN UP THE RAA/SAA/UAA AREAS AROUND THE RIG. CLEAN AROUND THE RIG IN PREPARATION FOR UPCOMING ~ OPERATIONS. NEEDLE GUN ANY RUST AREAS AROUND THE BRAKE LINKAGE. CHANGE OUT THE HYDRAULIC OIL IN THE TOP DRIVE. MOBILIZE XT-39 HANDLING EQUIPMENT AND ELEVATOR BALES TO THE RIG FLOOR. 24-HOUR NOTICE GIVEN TO THE AOGCC AT 06:45. BOB NOBLE RETURNED THE PHONE CALL AND ASKED FOR AN UPDATE AT 06:00 ~I ON 4-28. __ 12:00 - 19:00 7.00 MOB P ~ PRE RE-INSTALL THE BRAKE LINKAGE AND CONTINUE TO CLEAN AROUND THE RIG WHILE ~ FINISHING UP ON HOPKINS AUDIT FINDINGS. BP HSE REP. ALLEN GRAFF PERFORMED AHSE / ENVIRONMENTAL RIG CONDITIONING AUDIT AND ACCEPTED DOYON 141. CONTACTED RWO _ ~ SUPERINTENDENT JIM WILLINGHAM WHO GAVE THE AUTHORIZATION TO PROCEED AT 19:00. Printed 6/9/2010 11:05:33AM • s North America -ALASKA - BP Page 1 of 21 Operation Summary Report __ -_ __ _ _ _- Common Well Name: 04-29_DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 ~ End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date ~ From - To Hrs I Task ~ Code NPT NPT Depth ~ Phase Description of Operations __ _ ' (hr) (ft) 4/27/2010 19:00 - 00:00 5.00 WHSUR P _ _ DECOMP _ __ TAKE SEAWATER INTO THE PITS AND MOBILIZE LUBRICATOR TO THE RIG FLOOR. LOAD AND j STRAP DRILLPIPE IN THE PIPESHED. INSTALL ~ _ THE SECONDARY ANNULUS VALVE AND FINISH RIGGING UP THE HARDLINE. 4/28/2010 00:00 - 02:00 ~ 2.00 WHSUR P DECOMP RIG UP THE LUBRICATOR AND PRESSURE TEST ~ ~ TO 500 PSI. GOOD TEST. PULL THE BPV. RIG ~ i DOWN AND PREPARE TO CIRCULATE OUT THE _ ~ __ _ WELL. 02:00 - 03:30 j 1.50 WHSUR P - DECOMP _ ___ _ REVERSE CIRCULATE OUT 55 BBLS OF DIESEL I ~' FROM THE TUBING TAKING RETURNS TO THE TIGER TANK, 3 BPM AT 200 PSI ICP AND 750 PSI -- - FCP. 03:30 - 06:30 3.00 WHSUR P DECOMp CIRCULATE DOWN THE TUBING AND OUT TO THE TIGER TANK ,:.110 BBLS OF DIESEL AT 3 BPM WITH 150 PSI ICP AND 190 PSI FCP. LINE UP ~ AND BEGIN CIRCULATING TAKING RETURNS TO THE ROCKWASHER. 8.5 PPG SEAWATER IN AND OUT. NO GAS SEEN DURING FIRST ----- -- -- COMPLETE CIRCULATION. 06:30 - 07:00 0.50 WHSUR P ---- DECOMP ----- FMC DRY ROD IN TYPE J TWC TO PREPARE FOR ______ __~ ___ ~ N/D TREE. 07:00 - 08:00 1.00 WHSUR P DECOMP ___ _ TEST TWC FROM BOTTOM TO 1000-psi, BUT PRESSURE BLEEDS OFF QUICKLY WHILE USING I BOP TEST PUMP. ~ R/U TO TEST FROM THE TOP. FILL TREE AND BRING PRESSURE UP TO 3500-psi AND TEST HELD SOLID FOR 10-MINUTES. R/U TO TEST FROM THE BOTTOM USING THE RIG PUMP TO FILL THE BACK SIDE; S/I RIG PUMP AND f-- TEST HOLDS SOLID AT 1100-psi FOR __ _ 10-MINUTES. 08:00 - 08:30 0.50 WHSUR P DECOMP FMC BLEED DOWN THE SINGLE SSSV CONTROL _ LINE AND T HE ADAPTOR SPOOL VOID. 08:30 - 09:30 i 1.00 WHSUR P ~ DECOMP _ pJSM WITH CREW, DRILLER, AND WSL TO N/D AND UD TREE. WSL ASKED TOOLPUSHERS FOR THEIR INPUT AS TO HOW TO SAFELY N/D THE i TREE AND THEY DECIDED THAT THERE WAS i TOO MUCH EQUIPMENT IN THE CELLAR TO ____ _ _ SAFELY WORK AROUND. 09:30 - 10:00 0.50 WHSUR P DECOMP SET BACK NEW TREE, ADAPTOR SPOOL, AND TUBING HEAD. MOVE CELLAR TANK TO OPPOSITE SIDE. MOVE DRAIN LINES FROM RIG FLOOR DRAIN PAN TO CELLAR TANK. OPEN WINDWALL DOORS AND LIFT MEZZANINE CATWALK TO ALLOW A PULLBACK SNUBBING LINE TO BE RUN OUTSIDE TO A TIEBACK POST. Printed 6/9/2010 11:06:18AM ,• North America -ALASKA - BP Page 2 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. ~ UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ~ (ft) _ _ 10:00 - 11:30 1.50 WHSUR P _ DECOMP N/D TREE AT THE ADAPTOR SPOOL. USE FMC'S ~ LIFTING CAP TO SECURE TREE TO SUPER ~ TUGGER. R/U PULLBACK LINE TO BOTTOM OF TREE. ~ STOP AND HOLD A THA/PJSM TO DISCUSS HOW THE TREE NEEDED TO BE RESTRAINED AND UD (ON THE RIG MATS. ALSO DISCUSS HOW i 'COMMUNICATIONS WOULD BE HANDLED ii BETWEEN THE DRILLER LEADING THE JOB IN ' ; . THE CELLAR AND THE TWO TUGGER OPERATORS. ' i P/U TREE AND MOVE IT OUT OF THE WAY TO ALLOW FMC TO TERMINATE THE CONTROL LINE USEPULLBACK LINE-AND SUPER TUGGER LINE TO SLOWLY MOVE THE TREE TO A POSITION ~ NEXT TO THE CELLAR TANK ON THE RIG MATS - - -- - NEAR THE CELLAR DOOR. ----- 11:30 - 12:00 0.50 WHSUR - P ~ DECOMP TOUR CHANGE. DAY TOUR DRILLER, ~ ' FLOORHANDS, AND WSL HOLD PJSM IN CELLAR TO REVIEW HOW THE TREE WOULD BE ~ 1 UD AND AND REMOVED FROM THE CELLAR. _ 12:00 14:00 _ 2.00 ____ ___ WHSUR' __ __ P __ -- ~ --------- _ DECOMP I CONTINUE TO UD AND PREPARE THE TREE FOR i i i REMOVAL FROM THE CELLAR. REMOVE WING VALVE FROM TREE TO ENABLE IT TO PASS BETWEEN THE WINDWALL DOOR AND THE ~ CELLAR TANK. 14:00 - 17:00 i 3.00 BOPSUR P DECOMP PJSM TO N/U BOP STACK USING HAMMER ~ WRENCHES. THE USE OF A RESTRAINT ON THE HAMMER WRENCH WAS DISCUSSED BY THE ~ DRILLER AND FLOORHANDS. -----_ -- ~ --- --- -- --- ! ~ - ~ N/U BOP STACK. _ 17:00 - 19:00 2.00 ; BOPSUR P ~ DECOMP REMOVE HYDRIL TOP FLANGE. CLEAN SILICONE i i OUT OF THE STUD HOLES. INSTALL AND N/U THE DUTCH RISER SYSTEM ADAPTOR FLANGE. _ 19:00 - 20:00 1.00 BOPSUR P _ _ DECOMP CLEAR AND CLEAN THE CELLAR. RE-INSTALL MODIFIED RISER AND AIR UP THE BOOTS. 20:00 - 00:00 4.00 BOPSUR P DECOMP RIG UP TO TEST THE BOPE. INSTALL THE 4" TEST JOINT, MOBILIZE THE DART VALVE, TIW VALVE, AND CROSSOVERS TO THE RIG FLOOR. ~ PUT A BODY TEST ON THE BOP STACK. GOOD TEST. AOGCC REP. JOHN CRISP WAIVED STATES RIGHT TO WITNESS THE BOP TEST AT 23:15. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 3 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud DatelTime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations ~ (hr) (ft) _ __ ___ 4/29/2010 _ _ 00:00 - 08:00 8.00 BOPSUR P _ DECOMP _ TEST BOP EQUIPMENT TO 250 PSI LOW / 3,500 PSI HIGH PER AOGCC REGULATIONS ~ USING A 4" TEST JOINT. 5 MINUTES EACH TEST - 3-1/2' X 6" VBR VBR TOP RAM, CHOKE MANIFOLD VALVES 1,12,13,14 AND MANUAL KILL LINE HCR KILL, CHOKE MANIFOLD VALVES 9, 11 - LOWER 1BOP, CHOKE MANIFOLD VALVES 5,8,10 -DART VALVE, CHOKE MANIFOLD VALVES, 4, 6, 7 ~ - TIW VALVE, CHOKE MANIFOLD VALVE 2 ~ - HCR CHOKE AND 4"-DEMCO KILL LINE VALVE - MANUAL CHOKE -ANNULAR PREVENTER -ACCUMULATOR TEST ~ -BLIND RAMS, CHOKE MANIFOLD VALVE 3 - 3-1/2"X 6"VBR VBR TOP RAM WITH 4.5"TEST JT - UPPER IBOP FAILED TEST. I ~ TEST WITNESSED BY BP WSL CHRIS KOBUCK, j BP WSL MIKE ROONEY, BP WSL BILL BURSON, DOYON TP ERIC RODLAND AND DOYON i TOOLPUSHER CHARLIE HUNTINGTON. AOGCC REP. JOHN CRISP WAIVED STATES RIGHT TO WITNESS THE BOP TEST AT 23:15. 08:00 - 08:30 0.50 BOPSUR P DECOMP RIG DOWN THE TESTING EQUIPMENT. BLOW DOWN THE CHOKE, CHOKE LINE, KILL LINE, AND TOP DRIVE. 08:30 - 13:00 4.50 ~ BOPSUR P DECOMP CHANGE OUT THE LOWER PIPE RAMS TO 4" _ _ __ ~_ _ FIXED RAMS AND THE UPPER IBOP. 13:00 - 14:30 1.50 i BOPSUR P DECOMP TEST AND CHART THE UPPER IBOP TO 250 PSI LOW / 3,500 PSI HIGH FOR 5 MINUTES. GOOD TEST. BODY TEST THE BREAK ON THE LOWER RAMS TO 250 PSI LOW / 3,500 PSI HIGH FOR 5 MINUTES CHARTED. GOOD TEST 14:30 - 16:30 ~ 2.00 BOPSUR P DECOMP PICK UP AND MAKE UP THE DUTCH RISER ASSEMBLY AND THE DSM LUBRICATOR. TEST THE LUBRICATOR TO 500 PSI. GOOD TEST. _ 16:30 - 17:30 1.00 DHB P , DECOMP gTTEMPT TO PULL THE TWC 4 TIMES BUT ~ i COULD NOT GET AHOLD OF IT. SIGNS OF ~ j HAVING DEBRIS SITTING ON TOP OF THE TWC. 17:30 - 18:30 1.00 DHB P ~ DECOMP RIG DOWN THE LUBRICATOR AND DUTCH RISER EXTENSION. 18:30 - 19:30 i 1.00 DHB P ~ DECOMP PICK UP 4" JT. OF DRILLPIPE AND CLEAN OUT THE BOP STACK. PUMP 18 BBLS/MIN. AT 125 ~ PSI. SAW MUD AND SMALL DEBRIS ACROSS ~ THE SHAKERS. LAYDOWN THE JT. OF DRILLPIPE. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 4 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) I Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code ( NPT NPT Depth ~ Phase Description of Operations (hr) (ft) 19:30 - 21:00 1.50 DHB P DECOMP RIG UP DUTCH RISER EXTENSION AND DSM LUBRICATOR. TEST LUBRICATOR TO 500 PSI. GOOD TEST. PULL THE TWC . RIG DOWN THE LUBRICATOR AND DUTCH RISER EXTENSION. 21:00 - 22:00 ~ 1.00 PULL P DECOMP PICK UP JT. OF 4" DRILLPIPE AND MAKE UP TO 9" LH ACME CROSSOVER. SCREW INTO THE ~ HANGER 7-1/2 TURNS. FMC BACKED OUT THE j ~ LOCK DOWN SCREWS. 22:00 - 22:30 __ __ 0.50 ____ ~ PULL _ P ____ ___ i DECOMP HOLD PJSM ABOUT PULLING HANGER. PICK UP ON THE HANGER AND BREAK FREE AT 140K ON THE FIRST ATTEMPT. 22:30 - 00:00 ~ 1.50 PULL P DECOMP CIRCULATE SURFACE TO SURFACE (758 BBLS) STARTING AT 3 BPM WITH 100 PSI AND STAGE UP TO 8 BPM WITH 640 PSI. SMALL AMOUNT OF GAS BROKE OUT AT THE SURFACE AFTER BOTTOMS UP. WHILE CIRCULATING MOBILIZED AND RIGGED UP CONTROL LINER SPOOLER, ~ ALONG WITH CASING TONGS AND EQUIPMENT. _ 4/30/2010 00:00 - 02:00 2.00 PULL P DECOMP " DRAIN THE STACK AND PULL THE HANGER TO THE RIG FLOOR. TERMINATE THE CONTROL LINE. BREAK OFF THE HANGER AND PUP JTS. ~ BELOW IT. LAYDOWN THE LANDING JT. AND ! - CHANGE OUT THE ELEVATORS. --_ _ 02:00 - 14:30 --- 12.50 ` PULL P - DECOMP PULL AND LAYING DOWN 4.5" 13CR80 NSC COMPLETION AS FOLLOWS: ~ ~ -FMC TUBING HANGER -7"NSCCPXPPUPJT. -7"NSCCBX5.5"NSCTPXO - 5.5" NSCT B X 4.5" TDS P XO -4.5"TDSBX4.5"NSCTPXO i - 301 JTS. 4.5" 13CR80 NSCT TUBING - 6 GLM'S i ' - 14 4.5" 13CR80 NSCT PUP JTS. - 1 SSSV - 54 STAINLESS STEEL BANDS - CUT JT. 9.62' WITH A 4-7/8" FLARE TUBING IS IN GOOD CONDITION. MAINTAIN CONTINIOUS HOLEFILL WITH SEAWATER. HOLEFILL AT PROPER LEVELS. -- 14:30 - 16:00 1.50 PULL P DECOMP RIG DOWN TUBING HANDLING EQUIPMENT AND REMOVE FROM RIG FLOOR. AT 17:15 THE DRILLER HELD A RIG EVACUATION DRILL. THIS DRILL INCLUDED THE DOYON RIG CREW AND SCHLUMBERGER E-LINE CREW. EVERYONE WENT TO THE UPWIND SAFETY AREA IN A SAFE AND EFFICIENT MANNER. DUE TO THE INCLEMENT WEATHER THEY MUSTERED AT THE VEHICLES AND DROVE TO THE END OF THE PAD. THE EVACUATION OF THE RIG WENT VERY WELL. AFTER THE EVACUATION THE DRILLER HELD AN A.A.R. AND EVERYONE FELT THAT THE EVACUATION WENT WELL. 16:00 - 16:30 0.50 PULL P DECOMP CLEAR AND CLEAN RIG FLOOR AND PIPE SHED Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 5 of 21 Operation Summary Report ___ __ Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 '~ Spud Date/Time: 11/13/1985 12:0O:OOAM , Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT ! NPT Depth Phase Description of Operations ____ (hr) _ (ft) 16:30 - 17:00 0.50 BOPSUR P DECOMP _ MAKE UP 4" TEST JOINT AND F ST PLUG. TEST LOWER RAMS TO 250 PSI LOW AND 3x5,00 PSI HIGH EACH TEST WAS HELD FOR 5 i MINUTES ON THE CHART. GOOD TEST. TEST WAS WITNESSED BY BP WSL AND DOYON ____ _ ; TOOLPUSHERS. 17:00 - 00:00 7.00 EVAL P DECOMP R/U AND RUN SCHLUMBERGER E-LINE USIT LOG __ ____ _ IN 9-5/8"' CASING TO 3055'. 5/1/2010 00:00 - 01:00 1.00 ~ EVAL P _ DECOMP RIG DOWN SCHLUMBERGER E-LINE AND CLEAR AND CLEAN THE FLOOR. DETERMINE TOP OF CEMENT IS AT APPROX. 1930'. CONSULTED WITH TOWN WELL ENGINEER AND DECISION WAS MADE TO CUT AT 1860'. WHILE CLEARING AND CLEAN4NGTHE FLOOR HANDS RIGGED UP OA TO THE CHOKE MANIFOLD THAT GOES TO THE TIGER TANK. __ _ _ 01:00 - 01:30 0.50 DHB P DECOMP RIG UP TO RUN IN THE HOLE WITH 4" DRILLPIPE. 01:30 - 02:00 , 0.50 I DHB P DECOMP MOBILIZE HALLIBURTON 9-5/8" RBP AND ' RUNNING TOOL TO THE RIG FLOOR 02 00 03 00 ____ 1 0 . : - . 0 ~ DHB. i P DECOMP PICKUP 2 JTS. OF DRILL PIPE AND MAKE UP THE _ _ ~ __ HALLIBURTON 9-5/8" RBP AND RUNNING TOOL. 03:00 - 05:30 2.50 JDHB P _ _ DECOMP __ SINGLE IN THE HOLE ON 4" DRILLPIPE WITH THE HALLIBURTON 9-5/8" RBP AND SET ON DEPTH - - AT 1948' CENTER OF ELEMENT AND 1944' TOP _ ___ __ OF RBP. 05:30 - 07:00 1.50 DHB P DECOMP ESTABLISH CIRCULATION TO CLEAR DRILLPIPE ~ AND TO WASH 9-5/8" CASING FROM 1932' TO 1970' IN PREPARATION FOR SETTING THE RBP. SLOW PUMP RATES: #1 PUMP 3-BPM AT 50-psi; #2 PUMP 3-BPM AT 50-psi. P/U WT 59-K-Lbs, S/O WT 57-K-Ibs. SET HALLIBURTON 9-5/8" RBP T 1948.5' AND TOP AT 1944'. RELEASE FROM RBP AND SET DOWN 15K-Ibs TO CONFIRM. PRESSURE TEST RBP TO 3500-asi FOR 10-MINUTES. POH AND S/B 2-STANDS OF DP IN DERRICK AND PREPARE TO DUMP 2200-Ibs OR 44-SACKS OF 20-40 RIVER SAND ON TOP OF ~ HALLIBURTON 9-5/8" RBP. 07:00 - 10:00 3.00 DHB P DECOMP INSTALL SAND HOPPER ON TOP OF DRILLPIPE ~ ! AND DUMP 44-SACKJS OF 20-40 RIVER SAND TO PROVIDE 0' OF V R V .RBP SET _ _ AT 1948.5'. __ 10:00 - 10:30 0.50 DHB P DECOMP ESTABLISH SLOW CIRCULATION OF 2-BPM TO __ _ ! ~ MOVE ALL SAND OUT OF DRILLPIPE. 10:30 - 11:30 1.00 CASING P DECOMP pOH AND S/B DP IN DERRICK. BREAK-OFF AND ~ UD THE HALLIBURTON RBP RUNNING TOOL. Printed 6/9/2010 11:06:18AM r~ North America -ALASKA - BP Page 6 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 12:30 1.00 CLEAN P DECOMP BRING BAKER MULTI-STRING CUTTER AND OTHER BHA COMPONENTS TO RIG FLOOR AND ~ M!U BHA #1. 8-1/4" BAKER MULTI STRING ' CUTTER ASSEMBLY FOR CUTTING 9-5/8" CASING. BHA = 8-1/4" MULTI STRING CUTTER, XO, 8-1/2" STABLIZER, XO. TOTAL BHA LENGTH _ 13.76' 12:30 - 13:30 1.00 CLEAN P DECOMP RIH WITH CASING CUTTER ASSEMBLY ON 4" ~ XT-39 DRILLPIPE TO 1,870'. ESTABLISH ~ PARAMETERS, UP WEIGHT 58K, S/O WEIGHT TAG TOP OF SAND AT 1 890' P/U TO 1 ~ 60K 800' , , . . 13 30 - 14:00 0.50 CLEAN i P ~ DECOMP PUMP AT3 BPM AT 200 PSI TO OPEN CUTTER ANDSLACK OFF TO LOCATE 9-5/8" CASING COLLARS. LOCATE 9-5/8" CASING COLLARS AT ~ 1,819' AND 1,852'. SPACE OUT CUTTER TO CUT 9-5/8" CASING AT 1,862'. 14:00 - 14:30 ___ 0.50 CLEAN P ~ -bECOMP HOLD PJSM WITH ALL PERSONNEL INVOLVED IN ~ 9-5/8" CASING CUT AND ARCTIC PACK CLEAN OUT. 14:30 - 15:00 I 0.50 CLEAN P DECOMP CUT 9-5/8" CASING AT 1,862'. START ROTATING AT 60 RPM. BRING PUMP TO 2 BPM WITH 200 PSI. 1.5K ROTARY TORQUE. INCREASE TO 3 ~ BPM AT 250 PSI WITH 1.5K TO. INCREASE PUMP ~ TO 4 BPM AT 400 PSI WITH 2 - 4K TORQUE. INCREASE TO 5 BPM AT 700 PSI WITH 3 - 4K TORQUE. INCREASE TO 6 BPM AND CASING CUT THROUGH. SAW 30 PSI ON 13-3/8" X 9-5/8" _______ __ __ ANNULUS _ 15:00 - 16:30 1.50 CLEAN P DECOMP LINE UP AND PUMP 20 BBLS OF 120 DEGREE DIESEL DOWN DRILLPIPE TO CUTTER. CLOSE ~ ANNULAR PREVENTER AND OPEN UP TO TANK. PUMP 50 BBLS OF 120 DEGREE DIESEL DOWN 9-5/8" X 13-3/8" ANNULUS AT 2 BPM WITH 1,000 PSI DROPPING TO 800 PSI. R/D LITTIE RED. LINE UP AND PUMP 20 BBLS OF HEATED 9.8 PPG BRINE DOWN DRILLPIPE DISPLACING DIESEL ~ FROM DRILLPIPE TO ANNULUS. LET DIESEL SOAK ~ 16:30 - 21:30 5.00 CLEAN P ____ _ DECOMP DISPLACE WITH 290 BBLS 9.8 PPG BRINE AT 2 BPM AT 350 PSI STAGING UP TO 7 BPM WTIH ~ 2100 PSI. LINE UP AND PUMP 40 BBL ~ SAFE-SURF-O PILL AT 5 BPM WITH 2200 PSI, ~ CHASE WITH 600 BBLS OF SEAWATER AT 7 BBLS MIN AND 2500 PSI. AFTER THE INITIAL i i CIRCULATING WHERE LARGE AMOUNTS OF ~ i i ARCTIC PACK WERE NOTICED, THERE WERE NO MORE "CHUNKS". 21:30 - 22:00 0.50 ~ CLEAN P _ DECOMP MONITOR THE WELL. STATIC. 22:00 - 23:30 1.50 ~ CLEAN P DECOMP pULL OUT OF THE HOLE WITH THE BAKER 9-5/8' CASING CUTTER BHA. _ 23:30 - 00:00 0.50 i CLEAN P DECOMP CLEAR AND CLEAN THE RIG FLOOR OF ALL UN-NEEDED TOOLS. Printed 619/2010 11:06:18AM r~ i North America -ALASKA - BP Page 7 of 21 Operation Summary Report __ _ _ _ ___ Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay i Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 5/2/2010 00:00 - 01:00 1.00 CLEAN P ( DECOMP MOBILIZE 9-5/8" SPEAR AND MISC. CASING _ _ _ _ _ __ ( EQUIPMENT TO THE RIG FLOOR. _ __ _ " 01:00 - 02:00 1.00 CLEAN j P ( DECOMP CASING AND PICK UP TO SPEAR INTO THE 9-5/8 i ENGAGE THE GRAPPLE. BACK OUT THE ~ LOCK-DOWN SCREWS. PICK UP ON THE ~ ~ CASING AND THE HANGER BROKE FREE AT ~ 70K: UP WT. OF 105K ON THE CASING. __ _ _____ 02:00 - 03:30 ___ 1.50 CLEAN P DECOMP PULL HANGER TO THE RIG FLOOR, BREAK OUT THE HANGER WITH THE RIG TONGS, LAYDOWN THE HANGER AND PACKOFF ASSEMBLY. BREAK OUT AND lAY DOWN THE SPEAR. _ ____ _ 03:30 - 06:30 ~ 3.00 CLEAN P DECOMP PJSM, PICK UP AND MAKE UP THE 9-5/8" CASING TONGS AND CASING. EQUIPMENT. DUE TO THE SIZE AND BEING THE FIRST TIME USED ON THIS RIG, HAD A VERY EXTENSIVE PJSM. WHILE ASSEMBLING THE TONGS, SCREW INTO THE TOP'DRIV_E AND BEGIN CIRCULATING. _ 06:30 - 07:30 i 1.00 CLEAN P __ DECOMP GIRCULATE SEAWATER DOWN CASING TAKING RETURNS TO PITS AT 11 BPM WITH 510 PSI. - TIGHT ARCTIC PACK RETURNS. 07:30 - 09:30 2.00 CLEAN' P DECOMP POOH LAYING DOWN 9-5/8", L-80, 47# CASING. CASING APPEARS TO BE IN GOOD CONDITION. ~ LAY DOWN 32 JOINTS. STARTING TO GET ~ ARCTIC PACK BUILD UP ON CASING. CASING _ _ _ __ _ BROKE OUT WITH_30-40K TORQUE ___ i 09:30 - 10:00 0.50 i CLEAN ~ P" DECOMP CIRCULATE SEAWATER AROUND AT 8 BPM WITH 250 PSI. SLIGHT ARCTIC PACK RETURNS. 10:00 - 11:00 1.00 CLEAN P __ DECOMP POOH LAYING DOWN 9-5/8", L-80, 47# CASING. CASING APPEARS TO BE IN GOOD CONDITION. LAY DOWN 11 JOINTS PLUS 10.T CUT JOINT. CASING APPEARED TO BE IN COMPRESSION WHEN CUT. RECOVERED 43 JOINTS, CUT JOINT AND 10 CENTRILIZERS. _ _ 11:00 - 12:00 ~ 1.00 CLEAN P DECOMP R/D HANDING EQUIPMENT AND CLEAR AND ~ CLEAN RIG FLOOR. _ 12:00 - 15:00 ~ 3.00 CLEAN P __ DECOMP PICK UP AND MAKE UP 13-3/8" CASING i SCRAPER / 9-5/8"DRESS OFF ASSEMBLY BHA. BHA AS FOLLOWS: - 12.125" X 9.625" ID DRESS OFF SHOE - 11.75" WASH PIPE EXT. 10" OD X 8.5" ID 9.625" CASING DRESS OFF MILL - 11.75" WASHOVER BOOT BASKET - SUB 6.625 REG PIN X PIN - 13.375" CASING SCRAPER -BIT SUB 4.5 IF X 6.625 REG - 4.5 FLOAT SUB - XO 3.5 IF BOX X 3.5 IF PIN j - 4.75 BUMPER SUB ~ ~ - XO XT 39 BOX X 3.5 IF PIN i _~ - (8) 4.75" DRILL COLLARS Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 8 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) !Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ~ Phase Description of Operations (hr) (ft) 15:00 - 16:00 1.00 ~ CLEAN P DECOMP RUN IN THE HOLE TO 1781' AND WASH DOWN TO THE TUMP T 1 '. ROTATE 1/4 TURN ONTO THE STUMP AND DRESS OFF TO 1863'. MILLING AT 60 RPM WITH 2-6K TW AND 250 PSI. UP WT. 65K /DOWN WT. 67K /ROT WT. 66K 16:00 - 17:30 1.50 CLEAN P ~ DECOMP CIRCULATE SAFE-SURF-O SWEEP AT 12 BPM ~ WITH 850 PSI, WHILE ROTATING AT 60 RPM AND RECIPROCATING 30'. 17:30 - 20:00 2.50 i CLEAN P DECOMP MONITOR THE WELL FOR 10 MINUTES. STATIC. OUT OFTHE HOLE RACKING BACK THE PUL L 4.75" SPIRAL DRILL COLLARS AND LAYING DOWN THE DRESS OFF BHA. MONITOR THE WELL FOR 10 MINUTES.' STATIC. __ ___ _____ _ 20:00 - 20:30 0.50 CASING P DECOMP PJSM FORRUNNING9-5/8" CASING WITH DOYON; RIG CREW, CASING HANDS, TOURPUSHER, BP WSL, AND OTHER THIRD I ~ PARTY SERVICE PERSONNEL. _ 20:30 - 22:00 _ 1.50 ~ _ CASING P _ __ __ ~ TIE61 CLEAR AND CLEAN THE FLOOR OF ANY ~ UN-NEEDED TOOLS. RIG UP 9-5/8" CASING TONGS, ENSURE ALL OF THE CASING EQUIPMENT WAS FUNCTIONING CORRECTLY, AND THE TIW VALVE HAD THE CORRECT CROSSOVER ON IT. ____ 22:00 - 00:00 2.00 CASING P TIEB1 MAKE UP AND RUN IN THE HOLE WITH 9-5/8" ~ CASINGAS FOLLOWS: - 9-5/8" BOWEN CASING PATCH (BAKERLOK'D) ', - 9-5/8" 47# L-80 BTC PUP JT. (BAKERLOK'D) - 13-3/8" X 9-5/8" ECP (BAKERLOK'D) ~ - 9-5/8" 47# L-80 BTC PUP JT. (BAKERLOK'D) j - 9-5/8" 47# L-80 BTC PUP JT. (BAKERLOK'D) I - 9-5/8" HALLIBURTON ES CEMENTER i (BAKERLOK'D) - 9-5/8" 47# L-80 BTC PIN X HYD 563 BOX PUP i JT. (BAKERLOK'D) - 23 JTS. 9-5/8" 47# L-80 HYDRIL 563 CASING ~ ALL 23 JTS. OF CASING HAD A FREEFLOATING STRAIGHT BLADE CENTRALIZER. THE JTS. OF ~ CASING UTILIZED JET LUBE SEAL GUARD AND _~ WERE TORQUED TO 15,800 FT/LBS. ___ Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 9 of 21 Operation Summary Report _---- Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Datelfime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs ~ Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 5/3/2010 __ _ 00:00 03:00 __ 3.00 CASING P _ _ TIE61 CONTINUE TO RUN 9-5/8" 47# L-80 HYDRIL 563 CASING - 22 JTS. 9-5/8" 47# L-80 HYDRIL 563 CASING - 2 9-5/8" 47# L-80 HYDRIL 563 PUP JTS. (19.87', 9'.81') - 2 JTS. 9-5/8" 47# L-80 HYDRIL 563 CASING ALLJTS. OF CASING HAD A FREEFLOATING STRAIGHT BLADE CENTRALIZER EXCEPT JTS 45 ~ I & 46. THE JTS. OF CASING UTILIZED JET LURE i ~ SEAL GllARD AND WERE TORQUED TO 15,800 FT/LBS: ~ UP WT. 106K / DOWN. WT. 110K I ROTATE SLOWLY OVER THE STUB. ENGAGE THEE CASINGPATCH.AT-1862'. SET DOWN 25K, THEN PICK UP 25K. SET DOWN 50K, THEN PICK ~ UP SOK. PICK UP AT 250K TO ENSURE THE _ CASING PATCH IS FULLY ENGAGED. _ 03:00 - 06:00 3.00 CEMT P TIEB1 ' RIGbOWN 9-5/8" CASING EQUIPMENT, CHANGE OUT THE BALES TO LONG BALES, SPOT AND -" RIG. UP SCHLUMBERGER, PICK UP AND LOAD 'THE CEMENT HEAD. MAKE UP THE CEMENT HEAD TO THE BTC X HYDRIL 563 XO AND i TORQUE UP. RIG UP THE HARDLINE AND HOLD A PJSM WITH THE DOYON RIG CREW, ~ ~ TOURPUSHER, HALLIBURTON, BAKER, ~ CH2MHILL, SCHLUMBERGER, MI SWACO AND BP WSL's. 06:00 - 07:00 1.00 CEMT P _ TIEB1 TEST LINES TO 4,000 PSI, GOOD TEST. TEST CASING TO 1,000 FOR 10 MINUTES ON THE CHART. STAGE PRESSURE UP IN 200 PSI INCREMENTS, ECP OPENED AT 1,680 PSI AND BLED BACK TO 1,380PSI, BRING PRESSURE TO 2,100 PSI AND HOLD FOR 10 MINUTES ON THE I CHART. -1/4 TO 1/3 BBL TO FILL ECP. BLEED PRESSURE TO 0 PSI, THEN BRING PUMPS ON ~ LINE AT 2-1/2 BPM TO OPEN ES CEMENTER, ES j j CEMENTER SHEARED OPEN AT 2,780 PSI. 07:00 - 08:00 i 1.00 CEMT P TIEB1 ; CIRCULATE HEATED SEAWATER AROUND AT 8 ' i i ~ BPM WITH 380 PSI UNTIL RETURNS ARE 80 DEGREES. Printed 6/9/2010 11:06:18AM r1 North America -ALASKA - BP Page 10 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 ~ End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud DatelTime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: __ Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ~ Phase Description of Operations (hr) ~ (ft) 08:00 - 09:30 1.50 CEMT P TIE61 BATCH UP 15.8 PPG CLASS G CEMENT WITH GAS BLOC. PUMP 1~~$'BL~NT ~ STARTING PRESSURE 2-1/2 BPM AT 207 PSI AND ENDING PRESSURE 6.3 BPM AT 1,090 PSI, DROP CLOSING PLUG FOR HES ES CEMENTER, SCHLUMBERGER DISPLACED WITH SEAWATER AT 7 BPM. CAUGHT CEMENT 5-1/2 BPM AT 540 PSI, AT 120 BBLS OF DISPLACEMENT SLOW j PUMP RATE TO 2l3 BPM WITH 930 PSI, BUMP . PLUG AT 129 BBLS OF DISPLACEMENT, PRESSURE UP TO 2,135 PS ' tSAW POSITIVE INDICATION OF ES CEMENTER ~ i CLOSING. HOLD PRESSURE FOR 5 MINUTES. ~ ~ ~ BLEED OFF PRESSURE AND CHECK FOR FLOW. NO FLOW, ES CEMENTER IS HOLDING. CIP 09:17 HOURS. APPROX. 20 BBLS OF CEMENT BACK TO SURFACE. 648 SK OF CLASS G CEMENT ~ WITH 1:17 FT3/SK 09:30 - 10:30 1.00 CEMT P TIE61 - BLOW DOWN AND UNHOOK CIRCULATING LINES, FLUSH BOP STACK AND SIDE OUTLET 'VALVES, BLOW VALVES OUT. REMOVE CEMENT HEAD. 10:30 - 12:30 2.00 WHSUR P TIEB1 DRAIN BOP STACK, N/D AND RAISEBOP STACK AND EXPOSE 9-5l8" CASING 12:30 - 13:30 1.00 WHSUR - P - -- ' TIE81 INSTALL FMC 9-5/8" EMERGENCY SLIPS IN WELLHEAD AND LAND BY SETTING 100K IN j i SLIPS 13:30 15:00 1.50 WHSUR P TIEB1 MEASURE 9-5/8" CASING AND MARK WHERE TO MAKE CUT. R/U WACHS CUTTER AND CUT 9-5/8" CASING. REMOVE CUT 9-5/8" CASING JOINT FROM BOP STACK AND LAY DOWN IN PIPESHED. _ 15:00 - 15:30 0.50 WHSUR P TIEB1 REMOVE BELL NIPPLE AND STANDBACK BOP STACK. 15:30 - 16:00 0.50 WHSUR P TIE81 REMOVE LONG BAILS FROM TOP DRIVE AND i INSTALL STANDARD BAILS. P/U 4" PIPE ELEVATORS AND A JOINT OF 4" DRILLPIPE. ___ ~ 16:00 - 16:30 0.50 WHSUR _ P ~ TIE61 M/U PACK OFF RUNNING TOOL AND FMC 9-5/8" I PACK OFF AND INSTALL OVER 9-5/8" STUB. PUSH INTO PLACE. RUN IN LOCK DOWN SCREWS. _ ___ 16:30 - 18:00 I 1.50 WHSUR P TIE61 REMOVE OLD FMC 13-5/8" TUBING SPOOL FROM BOP STACK AND INSTALL NEW FMC 13-5/8 TUBING SPOOL. TEST 9-5/8" PACK OFF TO 3,800 ~ PSI FOR 30 MINUTES. GOOD TEST ____ __ 18:00 - 20:00 2.00 BOPSUR P TIE61 NIPPLE UP THE BOP STACK AND TEST T E BREAK TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES EACH CHARTED. GOOD TEST. 20:00 - 20:30 0.50 BOPSUR P TIE81 PICK UP THE WEAR RING RUNNING TOOL AND ~ SET THE WEAR RING. Printed 6/9/2010 11:06:18AM r~ `- North America -ALASKA - BP Page 11 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) i Start Date: 4/27/2010 I End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 ~ Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To i Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 20:30 - 22:00 1.50 CLEAN P DECOMP PICK UP BAKER CEMENT CLEAN OUT BHA. - 8.5" BIT - (4) 7" BOOT BASKETS i ( -BIT SUB ~ ~ -XO ~ - 4.75" BUMPER SUB ~ ~ - 4.75" OIL JARS j -PUMP OUT SUB XO ~ - - (8) 4.75" DRILL COLLARS 22:00 - 23:30 ~ 1.50 CLEAN P i DECOMP RUN IN THE HOLE FROM 285' TO 1700'. WASH DOWN FROM 1700 TO 1780' PUMPING AT 3 BPM WITH 50 PSI. TAGGED CEMENT AT 1780'. 23:30 - 00:00 0.50 CLEAN P DECOMP pRILL CEMENT`FROM 1780' TO 1790' AT 80 RPM PUMPING AT 8 BPM WITH 545 PSI. TO 1K 5/4/2010 00:00 - 03:00 , 3.00 CLEAN P DECOMP DRILL CEMENT FROM 1790' TO 1821' AT 80 RPM WITH 1 K TO PUMPING AT 8 BPM WITH 575 PSI. ROTATE AND RECIPROCATE THROUGH THE j AREA TO CLEAN ANY RESIDUAL CEMENT LEFT AFTER DRILLING THROUGH IT. SOFTLY TAG TOP OF SAND AT 1890' AND PUMP AT 16PM AND DRILL UP ANY DEBRIS ON THE TOP OF THE SAND. PUMP A 35 BBL HI-VIS SWEEP AT 10 BPM WITH 880 PSI SURFACE TO SURFACE GETTING LARGE AMOUNT OF METAL SHAVINGS, PIECES OF THE PLUG, AND SAND -- ___... 4.._.._.. ___ __-_ - BACK TO SURFACE. _ 03:00 - 04:30 1.50 j CLEAN P DECOMP MONITOR THE WELL FOR 10 MINUTES. STATIC. PULL OUT OF THE HOLE AND CLEAN OUT THE BOOT BASKETS. RECOVERED APPROX. 4 GALLONS OF SAND AND SMALL PLUG PARTS._ _ ____ 04:30 - 07:00 2.50 CLEAN P DECOMP ~ MAKE UP RCJB BHA AND BEGIN TO RUN IN THE I HOLE. - 7.875 RCJB WITH 8.5" HEAD - (4) 7" BOOT BASKETS - 9.625" CASING SCRAPER -BIT SUB -XO - 4.75" BUMPER SUB i - 4.75" OIL JARS ~ -PUMP OUT SUB -XO - (8) 4.75" DRILL COLLARS 07:00 - 08:00 1.00 i CLEAN P DECOMP RIH WITH RCJB ASSEMBLY TO 1,894', DROP i BALL, TAG TOP OF SAND AT 1,900'. SWALLOW i 3' AT 60 RPM WITH 1.SK TORQUE, 2 BPM WITH 200 PSI. INCREASE PUMP TO 7-1/2 BPM AT 1,450 PSI AND WORK RCJB TO 1,920' 08:00 - 09:00 1.00 CLEAN P _ DECOMP CIRCULATE AT 20 BBL SWEEP AROUND AT 8 BPM WITH 1,500 PSI. SWEEP BROUGHT UP SAND ; AND SOME METAL CUTTINGS. 09:00 - 09:30 0.50 CLEAN P DECOMP POOH FROM 1,920' TO 295', STANDING BACK 4" i XT-39 DRILLPIPE IN THE DERRICK. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 12 of 21 Operation Summary Report ___----- Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud DatelTime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ ___ ____ 09:30 - 10:30 1.00 CLEAN P DECOMP (STAND BACK DRILL COLLARS, BREAK OUT ~ RCJB, NO RECOVERY IN RCJB. RECOVERED 1/2 GALLON OF SAND AND METAL CUTTINGS IN JUNK BASKET. ____ 10:30 - 11:30 1.00 CLEAN P ~ __ DECOMP MAKE UP RCJB BHA AND RE-RUN ,RUN IN DRILL COLLARS FROM DERRICK TO 295' __ 11:30 - 12:30 1.00 CLEAN ~ P i DECOMP RIH WITH RCJB BHA ON 4" XT-39 DRILLPIPE __ FROM DERRICK. TO 1,920' 12:30 - 13:00 0.50 CLEAN ~ P DECOMP TAG SAND AT 1,922', ROTATE AT 70 RPM WITH i 1 K TORQUE AND 2 BPM AT 180 PSI SWALLOW 5', SAW INCREASE IN TORQUE TO 2-6K THEN DROPPED BACK,DOWN. INCREASED PUMP RATE TO 8 BPM WITH 1,OSOPSI AND WORKED RCJB ' TO 1,933' 13:00 - 13:30 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 8 BPM AT 1,050 ___ ______ PSI. SAW SOME SAND BACK AT BOTTOMS UP. 13:30 - 14:30 1.00 CLEAN P DECOMP ~ pOOH FROM 1,933' TO 295' STANDING BACK 4" XT-39 DRILLPIPE IN THE DERRICK. 14:30 - 15:30 ~ 1.00 CLEAN P ~ DECOMP STAND BACK DRILL COLLARS IN DERRICK ~ BREAK RCJB, NO RECOVERY, NO RECOVERY IN JUNK BASKETS. BREAK DOWN RCJB ASSEMBLY. 15:30 - 16:00 0.50 CLEAN - _ P _ DECOMP CLEAR RCJB BHA FROM RIG FLOOR. - 16:00 - 17:00 1.00 ---- CLEAN - P' ! DECOMP CLOSE BLIND RAMS AND TEST 9-5/8" CASING TO 3,500 PSI FOR 30 MINUTES ON THE CHART. GOOD TEST. _ 17:00 - 17:30 0.50 CLEAN- P DECOMP PICK UP AND MAKE UP HES 9-5/8" RBP RETRIEVAL TOOL. 17:30 - 18:30 1.00 CLEAN P DECOMP RIH WITH 4" DP TO 1920' MD. -ESTABLISH PARAMETERS OF P/U = 60K, S/O = ~ i 62K, PUMP RATE OF 8 BPM AT 170 PSI. -WASH DOWN TO 1944' MD, TAG RBP. ~ ( -STACK 15K WT AND LATCH RBP, CONFIRM LATCH WITH 15K P/U. 18:30 - 19:00 0.50 CLEAN _ P __ DECOMP CIRCULATE BOTTOMS UP AT 10 BPM, SEEING SAND ON SHAKERS. -PUMP 20 BBLS HI-VIS SWEEP FOLLOWED BY CLEAN SEAWATER SEEING SAND AT THE SHAKERS WITH THE SWEEP. ____ _ ___ _ 19:00 - 19:30 __ _ 0.50 CLEAN P DECOMP RELEASE RBP WITH 1 TURN TO THE RIGHT. -RIH 10' PAST SETTING DEPTH TO CONFIRM -- ------- -------..____-- t---- _..-------- RELEASE. 19:30 - 20:00 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 8.5 BPM AND 270 PSI. -10 BBLS OF DIESEUSEAWATER WAS DUMPED i WHEN BOTTOMS UP WAS ACHIEVED. -CONTINUE CIRCULATING TILL CLEAN SEAWATER WAS SEEN, A TOTAL OF 244 BBLS PUMPED. 20:00 - 21:30 1.50 CLEAN P DECOMP FLOW CHECK WELL -STATIC. -POOH WITH RBP, RACKING BACK DP. -COMPLETE RBP WAS RECOVERED, WITH TOOLS AND UD. Printed 6/9/2010 11:06:18AM r~ North America -ALASKA - BP Page 13 of 21 Operation Summary Report __ - Common Well Name: 04-29 DIMS ~ AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs ~ Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 00:00 2.50 CLEAN P DECOMP M/U DRESS OFF CASING SCRAPER BHA. -6" x 4-9/16" DRESSOFF SHOE, 5-3/4" TSS EXT, 4-3/4" x 3-7/8" TBG DRESSING MILL, 5-3/4" WASHOVER BOOT BASKET, 7" CSG SCRAPER, BIT SUB, 4-3/4" BUMPER SUB, 3-1/2" PUMP OUT SUB, XO, 4-3/4" DRILL COLLARS, 59 JTS DRILL PIPE, XO, 9-5/8" CSG SCRAPER. ___ 5/5/2010 00:00 - 02:30 _ 2.50 CLEAN P DECOMP RIH P/U 4" XT-39 DRILL PIPE FROM PIPESHED. 02:30 - 03:00 0.50 CLEAN P DECOMP HOLD RIG EVAC. DRILL. ALL CREW AND SERVICE PERSONNEL WENT TO SAFE BREIFING AREA. _ 03:00 - 06:00 3.00 CLEAN P DECOMP RIH P/U 4" XT-39 DRILL PIPE FROM PIPESHED to 9,005' 06:00 - 09:30 3.50 CLEAN N HMAN DECOMP REVIEWED BHA AND-FOUND THERE WAS NOT ENOUGH. DRILL PIPE BELOW 9-5/8" CASING i SCRAPER. POOH STANDING BACK 4" XT-39 DRILL PIPE IN DERRICK to 2,142'. *NOTIFIED AOGCC OF 24 HOUR NOTICE FOR WEEKLY I BOPE' TEST AT 06:30' - -- 09:30 - 10:00 0.50 CLEAN P DECOMP" p/U 3 MORE JOINTS OF 4" XT-39 DRILL PIPE THEN PICK 9-5/8" SCRAPER BACK UP. BHA = i 2,236.45' _ 10:00 - 12:00 _ 2.00` CLEAN P DECOMP RIH WITH DRESS OFF BHA ON 4" XT-39 DRILL - PIPE FROM 2,236' TO 8,252' 12:00 - 15:00 3.00 CLEAN P DECOMP CONTINUE TO RIH FROM 8,252' TO 12,126' WHERE TAG UP WAS MADE. i -ESTABLISH PARAMETERS OF 210 UP, 120 DOWN AND 160 ROT. @ 60 RPM AND 9K FREE TO. 6 BPM AT 950 PSI. -7" LINER TOP AT 9958' MD. HAD TO WORK THROUGH TOP OF 7" LINER. HAD TO TURN I ~ ~ STRING TO GET ASSEMBLY TO FALL THROUGH. 15:00 - 15:30 __ 0.50 CLEAN __ P DECOMP SWALLOW 15' OF TUBING STUB AND DRESS i I OFF 4.5" TUBING STUB AT 60 RPM AND 10K TO. -6 BPM AND 990 PSI. TOP OF TUBING STUB AT 12,127'. ~ -WORK SCRAPER ACROSS PACKER SETTING DEPTHS OF 9850' AND 12,030' 4 TIMES EACH. -ENSURE STUB COULD BE CLEARED WITH NO ~ ROTATION. 15:30 - 17:00 1.50 CLEAN _ P _ DECOMP CIRCULATED HI-VIS SWEEP AROUND AT 10.5 BPM AND 2700 PSI. -NOTHING NOTED ACROSS SHAKERS. A TOTAL _ OF 610 BBLS PUMPED. __ 17:00 - 21:30 _ 4.50 CLEAN P __ DECOMP FLOW CHECK WELL -STATIC. -POOH TO 2236'. ~ ~ -FLOW CHECK WELL -STATIC. 21:30 - 22:00 0.50 CLEAN P DECOMP L/D 9-5/8" SCRAPER AND CLEAR RIG FLOOR OF XO. 22:00 - 22:30 0.50 CLEAN P , DECOMP POOH WITH DP IN BHA AND RACK BACK IN DERRICK. Printed 6/9/2010 11:06:18AM r North America -ALASKA - BP Page 14 of 21 Operation Summary Report __ -- _ --- Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) i Start Date: 4/27/2010 ~ End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ __ _ 22:30 - 00:00 1.50 CLEAN P DECOMP UD BHA AND 7" SCRAPER. -L/D DRILL COLLARS, XO, TSS EXT, AND SHOE. -GOOD INDICATIONS ON MILL OF DRESSING OFF 4-112" TBG. ---- - 5/6/2010 00:00 - 01:30 1.50 CLEAN P - DECOMP pJSM FOR L/D BHA. -CONTINUE TO UD 4-1/2" DRESS OFF BHA. ~ -CLEAN AND CLEAR RIG FLOOR.__ _______ ______ _ _ ___ _ _ 01:30 - 02:00 0.50 CLEAN I P ~ ___ _ _ DECOMP P/U HES 9-5/8" RTTS WITH XO. 02:00 - 06:00 4.00 CLEAN ~ P DECOMP RIH WITH DRILL PIPE FROM DERRICK. -RfH TO;-7,000'. 06:00 - 07:00 _ 1.00 CLEAN P bECOMP RIH WITH HES 9-5/8" RTTS ON 4" XT-39 DRILLPIPE FROM DERRICK. ~ -RIH FROM 7,000' TO 9;902' -CALLED AOGCC AT 06:22 HRS AND LEFT A ' UPDATE ON UPCOMING BOP TEST. _ 07:00 - 08:00 1.00 CLEAN P -0ECOMP ESTABLISH PARAMENTERS, UP 165K, S/O 108K. SET HES 9-5/8" RTTS AT 9,902'. MAKE 3 TURNS TO THE RIGHT AND LET TORQUE OUT, 2 TURNS BACK. SLACK OFF AND SET 15K DOWN ON RTTS. R/U TO TEST 9-5/8" CASING FROM 9,902 TO SURFACE. TEST TO 3,500 PSI FOR 30 MINUTES ON THE CHART. GOOD TEST. BLEED _ _ OFF PRESSURE. _ 08:00 - 08:30 0.50 CLEAN_ P DECOMP UNSEAT HES 9-5/8" RTTS, LET ELEMENTS RELAX FOR 10 MINUTES, SUaCK OFF BELOW 9,902' TO ENSURE RTTS RELEASED. UP WEIGHT i 165K, S/O WEIGHT 108K. OBSERVE WELL, WELL STATIC. UD ONE JOINT OF 4" XT-39 DRILLPIPE. 08:30 - 10:00 1.50 CLEAN P ~ DECOMP SLIP AND CUT 123' OF DRILLING LINE. INSPECT DRAW WORKS AND DRUM BRAKES. 10:00 - 13:00 3.00 CLEAN P DECOMP POOH STANDING BACK 4" XT-39 DRILLPIPE IN ~ ' DERRICK FROM 9,870' -- 13:00 - 14:00 1.00 CLEAN P --- DECOMP --- BREAK OUT AND I.AY DOWN HES 9-5/8" RTTS. -REMOVE RTTS FROM RIG FLOOR. i -CALLED AOGCC @1400 HRS AND LEFT A _ ! 4:00 - 15:00 1.00 BOPSUR ____ P _ ___ DECOMP UPDATE ON UPCOMING BOP TEST. NO ANSWER. M/U FMC RUNNING TOOL AND PULL 8-3/4" ID WEAR BUSHING. -@ 1430 HRS CALLED DAVE BJORK WHO NOTIFIED AOGCC AND SPOKE WITH GUY SWARTZ OF UPCOMING BOP TEST. HE MENTIONED TO ATTEMPT TO CALL THE SLOPE OFFICE ONE MORE TIME AND IF NO ANSWER TEST WITNESS WOULD BE WAIVED. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 15 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud DatelTime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations 15:00 - 21:00 6.00 ~ BOPSUR P DECOMP TEST BOP EQUIPMENT TO 250 PSI LOW / 3,500 PSI HIGH PER AOGCC REGULATIONS USING A 4" TEST JOINT. 5 MINUTES EACH TEST - 3-1/2' X 6" VBR TOP RAM, CHOKE MANIFOLD VALVES 1,12,13,14 AND MANUAL KILL LINE ~ I ~ - HCR KILL, CHOKE MANIFOLD VALVES 9, 11 -LOWER IBOP, CHOKE MANIFOLD VALVES i 5,8,10 -DART VALVE, CHOKE MANIFOLD VALVES, 4, j 6 7 - TIW VALVE, CHOKE MANIFOLD VALVE 2 HCR CHOKE AND 4"DEMCO KILL LINE VALVE -MANUAL CHOKE - -ANNULAR PREVENTER -ACCUMULATOR TEST -BLIND RAMS, CHOKE MANIFOLD VALVE 3 - 3-112' X 6" VBR VBR TOP RAM WITH 4.5" TEST JT -ALL GOOD TESTS. ~ TEST WITNESSED BY BP WSL BILLY BURSON, BP WSL JOHN WILLOUGHBY, DOYON TP ERIC ' RODLAND AND DOYON TOOLPUSHER VICTOR j TORRES. AOGCC REP. GUY SWARTZ WAIVED STATES I ~ RIGHT TO WITNESS THE BOP TEST AT 15:00 HRS. ___ _ _ _ 21:00 - 22:30 j _ 1.50 ___ BOPSUR P i _ __ _ DECOMP RIG DOWN BOPE TEST EQUIPMENT. ~ -ATTEMPT TO PULL TEST PLUG OUT AND PLUG GOT BOUND UP WITH PART OF THE ANNULAR j PREVENTER THAT WAS PROTRUDING. -DECISION WAS MADE TO CHANGE THE ANNULAR PREVENTER. -THE TEST PLUG WAS SET BACK INTO PLACE. -TOWN ENGINEER WAS NOTIFIED AND ~ DISCUSSION OF BARRIERS WAS DETERMINED TO BE THE WRP AND THE BLIND RAMS AFTER ~ RETESTING. -PRESSURE TEST THE BLINDS FROM BELOW TO 1000 PSI FOR 10 MIN. GOOD TEST. _ 22:30 - 00:00 ~'~ 1.50 BOPSUR N RREP _ DECOMP RIG DOWN DUTCH RISER SYSTEM AND GATHER ~ EQUIPMENT TO REPLACE THE ANNULAR PREVENTER ELEMENT. -PERFORM HAZARDOUS ASSEMENTS. 5/7/2010 00:00 - 06:00 ~ 6.00 BOPSUR N RREP DECOMP PJSM -CHANGE ANNULAR PREVENTER ELEMENT. - MENT. -REPLACE THE ANNULAR PREVENTER ELEMENT. -N/U ALL EQUIPMENT. -RETEST ANNULAR PREVENTER TO 250 PSI ~ LOW AND 3500 PSI HIGH WITH 4" TEST JOINT. Printed 6/9/2010 11:06:18AM r~ North America -ALASKA - BP Page 16 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 06:00 - 07:30 1.50 BOPSUR P _ DECOMP RIG DOWN BOPE TEST EQUIPMENT. PULL AND LAY DOWN TEST PLUG. INSTALL WEAR BUSHING. ____ __ _ 07:30 - 08:00 0.50 FISH _ P DECOMP ..RIG UP 2-7/8" PAC DP HANDLING TOOLS. 08:00 - 10:00 2.00 FISH P ~ DECOMP pUMU FISHING BHA #8 TO FISH JUNK CATCHER S: -3-1/2" ITCO SPEAR W/3.00" GRAPPLE -2-3/8" SPEAR EXTENSION -7-3/8" SPEAR STOP SUB -X0 -XO ~ -3 JTS. 2-7/8" FOX TUBING -XO ~ 10:00 - 16:00 6.00 FISH P DECOMP RIH WITH BHA #8 ON 4" XT-39 DP. 16:00 - 20:00 4.00 FISH P DECOMP CIRCULATEAND SWAP WELL TO CLEAN SEAWATER AT 8.0-BPM AT 1660-PSI. _ _ ___ _ 20:00 - 21:00 1.00 FISH , - P DECOMP ESTABLISH FISHING PARAMETERS: -PUW = 200K, SOW = 125K, PUMP ON @ ~ 2.0-BPM @ 380-PSI. -SET DOWN ON FISH AT 12155' AND SEE SHEAR SCREWS SHEAR WITH 5K DOWNWEIGHT. SET ADDITIONAL 10K. PUMP PRESSURE INCREASED ~ TO 1080-PSI. PUMP OFF AND PRESSURE DECREASED TO 900-PSI. BLED OFF PRESSURE TO 0-PSI. PICKED UP 13' WITH 8-10K OVERPULL. PUMP ON AT 2.0-BPM AT 480-PSI. RIH AND TAG FISH AT 12155'. PRESSURE INCREASED TO 1080-PSI WITH 10K DOWNWEIGHT. PUMP OFF AND BLED PRESSURE TO 0-PSI. SET ~ ADDITIONAL 15K DOWNWEIGHT ON FISH. POH ~ WITH 45K OVERPULL. CONTINUE POH WITH UPWEIGHT FLUCTUATING FROM 5K TO 40K. ~ POH AND STAND BACK STAND. DRAGGING STOPPED AND MADE DECISION TO POH. BLEW DOWN TOP DRIVE. MONITORED WELL FOR FLOW. NO FLOW. 21:00 - 00:00 3.00 FISH _ P _ DECOMP pOH WITH FISH STANDING 4" DP IN DERRICK. ~ I -CONDUCTED KICK WHILE TRIPPING DRILL. AAR ~ HELD TO RECOGNIZE AND LEARN FROM DRILL j RESULTS. 5/8/2010 00:00 - 01:30 i 1.50 FISH N DPRB _ _ DECOMP CONTINUE POH WITH FISH STANDING 4" DP IN ~ DERRICK. _ _ _ __ _ 01:30 - 02:00 0.50 ~ FISH P ___ DECOMP CONDUCT RIG EVACUATION DRILL AND AFTER ( _ ACTION REVIEW. _ 02:00 - 06:00 _ 4.00 ~ _ FISH N DPRB DECOMP CONTINUE POH WITH FISH STANDING 4" DP IN ~ ~ DERRICK. NO FISH, GRAPPLE WAS IN RELEASE POSITION. PIN WAS STILL IN PLACE. PINS ON j BOTTOM OF SPEAR WERE GONE. 06:00 - 07:00 1.00 j FISH N DPRB DECOMP ADD EXTENSION TO SPEAR, CHANGEOUT GRAPPLE. CATCH RANGE ON GRAPPLE 2.994" ~ TO 3.001" TAPE GRAPPLE IN POSITION. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 17 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13!2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To ~ Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) -------------- ------- 07:00 - 12:00 -- 5.00 FISH P DECOMP RIH WITH JUNK CATCHER BHA ON 4" XT-39 DRILLPIPE FROM DERRICK. RI_H TO 8,756' 12:00 - 12:30 i 0.50 FISH _ P _ ___ DECOMP CREW CHANGE, SERVICE RIG, SET AND TEST ALARMS. 12:30 - 13:30 1.00 FISH P ; DECOMP RIH WITH JUNK CATCHER BHA ON 4" XT-39 DRILLPIPE FROM DERRICK. RIH TO 12144'. PUW ~ = 200K, SOW = 125K. 13:30 - 16:00 ___ 2.50 _ ~ FISH P DECOMP WASH TO 12173', ICP @ 4.0-BPM @ 1650-PSI. ~ St.OWED PUMP TO 2.0-BPM @ 920-PSI. WORKED SPEAR INTO JUNK CATCHER WITH A PRESSURE INCREASE TO -1200-PSI. PULLED JUNK CATCHER TO 12050' WITH 40-45K j OVERPULL WHILE CONTINUING TO PUMP AT ~ i 2,0-BPM AT'1000-PSL .FISH DRAGGING -40K i I TO TOP ?F4-1/2" TUBING STUB AT 12027 WHERE DRAGGING CEASED. 16:00 - 16:30 0.50 FISH ~ P DECOMP MIXED AND PUMPED 20-BBLS. 9.1-PPG BRINE SLUG. BLEW DOWN TOP DRIVE. 16:30 - 23:00 6.50 FISH P DECOMP _ pJSM AND HAZARD RECOGNITION. POH WITH i - FISH. PIPE PULLING DRY. RECOVERED JUNK CATCHER ON SPEAR. BROKE OUT AND LAYED DOWN SPEAR AND JUNK CATCHER. UNABLE TO RELEASE SPEAR FROM JUNK CATCHER. LARGE BULGE ON JUNK CATCHER APPROX. 6' FROM TOP. 23:00 - 00:00 1.00 I. FISH P DECOMP pUMU WRP OVERSHOT BHA #10 AS FOLLOWS: i -WEATHERFORD WRP RETRIEVAL TOOL -XO -3 JTS. 2-7/8" FOX TUBING -XO -XO 5/9/2010 00:00 - 06:00 ~ 6.00 __ FISH P ~ DECOMP RIH WITH WRP RETRIEVAL BHA #10 ON 4" XT-39 ~ i DP FROM DERRICK. _________ 06:00 - 07:00 1.00 FISH _ P DECOMP RIG UP TO REVERSE CIRCULATE, TO CLEAN ~ SLUGGITS OFF OF WRP 07:00 - 09:00 2.00 FISH P ~ __ DECOMP ~ REVERSE CIRCULATE AT 6 BPM WITH 700 PSI. TAKING 10 - 15K TO SLIDE THROUGH CLOSED ANNULAR. TAGGED SLUGGITS AT 12,172'. REVERSE DOWN TO 12,187' LATCHED ONTO WRP AND OPENED EQUALIZER PORT. WELL WENT ON A VAC. SET 15K DOWN ON WRP. PICK UP AND WRP RELEASED AT 15K OVER PULL. SLACK OFF TO 12,197' TO ENSURE WRP IS ~ RELEASED. PUMP DOWN KILL LINE AT 12 BPM i CAUGHT FLUID. FILLED HOLE. BULLHEAD 22 ~ BBLS OF SEAWATER AT 4-5 BPM, ICP 120 PSI, i FCP 30 PSI. OPEN ANNULAR AND ESTABLISH _ LOSS RATE OF 230 BPH. 09:00 - 09:30 0.50 _ FISH P DECOMP BLOW DOWN AND RIG DOWN CIRCULATING ----~ LINES. Printed 6/9/2010 11:06:18AM i North America -ALASKA - BP Page 18 of z i Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) ~ - - --- Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 - 00:00 14.50 FISH P DECOMP POOH LAYING DOWN 4" XT-39 DRILLPIPE DOWN THROUGH PIPESHED. FILLING HOLE AT 60 BPH PLUS PIPE DISPLACEMENT WITH SEAWATER. PIPE STARTED PULLING WET AT 3000' DP LEFT _ __ i t IN HOLE. __ 5/10/2010 i 00:00 - 00:30 0.50 ~ FISH P DECOMP CONTINUED AND COMPLETED POH LDDP THROUGH PIPE SHED. __ 00:30 - 01:30 1.00 FISH P i _ DECOMP ~ BREAKOUT AND LAY DOWN 3-JTS. 2-7/8" FOX TUBING, WRP RETRIEVAL O/S AND 4-1/2" WRP. 01:30 - 02:30 1.00 t FISH P ! DECOMP 'I CLEAR AND CLEAN RIG FLOOR. ---- ---- - 02:30 - 03:00 -- ~ 0.50 RUNCOM - P RUNCMP - PJSM -REVIEWED RIGGING UP TO RUN 4-1/2" ~ 13CR80 PROCEDURE AND PLAN. _ _ ____ 03:00 - 05:00 _ 2.00 RUNCMM P _ __ RUNCMP RIG UP DOUBLE STACK-TONGS, SINGLE JOINT COMPENSATOR, SINGLE JOINT ELEVATORS, TORQUE TURN EQUIPMENT. SWAPPED OUT SHORT BAILS TO LONG BAILS AND PICKED UP 4-1/2" MYC ELEVATORS. PLACED COMPLETION _j _ __ _ __ __ JEWELRY IN_ORDER OF RUN IN PIPE SHED. _ 05:00 - 05:30 0.50 RUNCMM P RUNCMP AAR -REVIEW CHROME TUBING RUNNING PROCEDURE. ---- --- - ----- 05:30 - 00:00 18.50 --- RUNCMM --- P -- -- RUNCMP ( pJSM. RIH GAS LIFT COMPLETION ON 4-1/2" 13CR80 CHROME TUBING PER RUNNING ORDER. WSL, DRILLER AND HES REP. VISUALLY VERIFIED PLACEMENT OF RHC-M PLUG BODY AND ALL OTHER COMPLETION JEWELRY. PICKED UP EACH JOINT AND STABBED CONNECTIONS WITH SINGLE JOINT I COMPENSATOR AND HAND STARTED EACH CONNECTION BEFORE APPLYING HYDRAULIC TONGS TO MAKE UP CONNECTION. MADE UP ALL CONNECTIONS TO 4440-FT. LBS. TORQUE AND CHARTED MAKEUP TORQUE TURN DATA. USED NEW CAN OF JET LUBE SEAL-GUARD THREAD COMPOUND. _ _ 5/11/2010 _ 00:00 - 01:00 ___ 1.00 RUNCOM P RUNCMP CONTINUE RIH WITH 4-1/2" 13RC80 COMPLETION. 01:00 - 02:00 _ 1.00 RUNCMM P RUNCMP SPACEOUT UNIQUE OVERSHOT OVER 4-1/2" TUBING STUB. -TAGGED 4-1/2" TUBING STUB AT 2' IN ON JT. ~ #299 OR 12131'. P/U WT. = 181 K, S/O WT. _ 87K. ! i -ATTEMPT TO SWALLOW 4-1/2" TUBIN ~ ~ WITH OVERSHOT WITH 20K DOWNWEIGHT. NO ~ JOY. ATTEMPT TO TURN TUBING WITH RIG TONGS AND ROTARY TABLE. UNABLE TO ~ TURN TUBING. _j -LAY DOWN JT. #299. Printed 6/9/2010 11:06:18AM North America -ALASKA - BP Page 19 of 21 Operation Summary Report Common Well Name: 04-29 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _____ _ 02:00 - 04:30 2.50 RUNCOM _ P RUNCMP LAY DOWN JT. #299. RIG DOWN SINGLE JOINT COMPENSATOR. MAKEUP XO AND 4" XT39 TIW VALVE TO TOP OF JT. #299. PUMU JT. #299 TO TUBING STRING AND MAKEUP TO TOP DRIVE. SET TOP DRIVE TORQUE LIMIT AT 5K FT-LBS. (MAX. MAKEUP TORQUE ON 4-1/2" TUBING = 4880 FT-LBS.) TURN STRING 180 DEGREES TO ORIENT OVERSHOT AND ATTEMPT TO SWALLOW 4-1/2" TUBING STUB WITH 20K i DOWNWEIGHT AND NO JOY. TURN TUBING STRINGADDITIONAL 90 DEGRESS AND ATTEMPT TO SWALLOW TUBING STUB WITH 20K DOWNWEIGHT AND NO JOY. TURN TUBING TO 90 DEGREES FROM ORIGINAL ORIENTATION AND APPLY 20K DOWNWEIGHT WITH NO JOY. COMMENCE PUMPING AT 2.0-BPM AT 40-PSI ANDSTAGE'PUMP UP TO 5.0-BPM AND AFTER CATCHING FLUID AT 20-BBLS. AWAY, PRESSURE INCREASED TO 240-PSI. WASHED DOWN 3-4' OVER STUB WITH 2-4 RPM AND 5K FT-LBS TORQUE AND FROM 5-15K DOWN WEIGHT, AT 4' OF SWALLOW, COULD WASH NO DEEPER AND SET DOWN WITH 25K ~ ! DOWNWEIGHT, PULLED OFF TUBING STUB WITH 200K P/U WT. ___ 04:30 - 08:30 4.00 RUNCOM N DPRB - RUNCMP TALKED OVER PLAN FORWARD WITH DAY WSL AND AGREED MIXING AND PUMPING 60-BBL. SAFE-CUBE PILL WITH 2 DRUMS SAFE-CUBE TO REDUCE TUBING DRAG. WAIT ON SAFE-CUBE TO ARRIVE FROM M-I. _ 08:30 - 09:30 1.00 RUNCMM N DPRB RUNCMP RIG DOWN COMPLETION HANDLING EQUIPMENT. O PUMP SAFELUBE DOWN BACKSIDE. RIG UP T __ _ 09:30 - 12:30 i ___ ___ 3.00 RUNCMM N DPRB i RUNCMP ( _ PUMP 100 BBLS SEWATER WITH 2 DRUMS ! SAFELUBE DOWN BACKSIDE. CHASE WITH 400 ~ BBLS SEAWATER. SHUT DOWN. Printed 6/9/2010 11:06:18AM r~ ~~ North America -ALASKA - BP Page 20 of 21 Operation Summary Report Common Well Name: 04-29_DIMS ~ AFE No End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Event Type: WORKOVER (WO) Start Date: 4/27/2010 - Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Date/Time: 11/t3/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To ~ Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) __ 12:30 - 14:00 1.50 RUNCOM N DPRB RUNCMP _ RIG UP TO RUN COMPLETION. WORK PIPE ' DOWN, TAG UP WITH 4FT OF SWALLOW, SET DOWN 30K, NO GO. SCREW IN TOP DRIVE. ROTATE 1/2 TURN TO THE RIGHT AND SET ~ DOWN AGAIN, NO GO. ROTATE 1/4 TURN SET ,DOWN TWICE AND MAKE PROGRESS ON ~ SECOND ATTEMPT, SETTING DOWN 25K EACH TIME. WORK DOWN TO 8 FT SWALLOW WITH ! SUCCESSIVE 1/4 TURNS. UP WEIGHT 168K, DOWN WEIGHT 103K. WORK PIPE SEVERAL ~ TIMES WITH NO ROTATION TO 12 FT SWALLOW. OBSERVE 10K DROP IN DOWN WEIGHT FROM 25KJ0 15K INDICATING,SECOND SET OF SHEAR PINS. CONTINUE TO WORK DOWN TO 14.5 FL SWALLOW, TAGGINGNO GO. VERIFY WITH 3 MORE PASSES TAKING 25K DOWN WEIGHT AT SAME DEPTH. KICK ON PUMPS AT 2 BPM WITH 40 PSI, WORK OVER TOP OF STUMP WITH NO I PRESSURE INCREASE. INCREASE PUMP RATE TO - 3 BPM WITH 40 PSI. WORK DOWN AND SEE PRESSURE INCREASE TO 70 PSI WITH 10 FT OF SWALLOW. PULL OFF OF STUMP AND SEE ! PRESSURE DROP OFF TO 40 AT 4FT SWALLOW. 14:00 - 17:00 3.00 RUNCOM ; N DPRB ~ RUNCMP SPACE OUT FOR LANDING HANGER. PULL j ~ ~ JOINTS, MAKE UP PUPS AND RUN JOINT BACK ___ __ __ ~ IN. LAND HANGER ON LANDING JOINT. RILDS 17:00 - 19:00 2.00 RUNCMM N DPRB ___ RUNCMP RIG DOWN TUBULAR HANDLING EQUIPMENT. _ __ _ ----- - CLEAR AND CLEAN FLOOR. 19:00 - 00:00 ~ 5.00 - RUNCMM N DPRB T RUNCMP MIRU SLICKLINE UNIT. -PJSM. REVIEW RIGGING UP SLICKLINE PROCEDURE. i -PUMU DUTCH LUBRICATOR LOCKDOWN MANDREL. ~ -PUMU SLICKLINE LUBRICATOR, PUMP-IN SUB AND WIRELINE BOPE. -PRESSURE TEST LUBRICATOR TO 500-PSI AGAINST BLIND RAMS. FAILED TEST. -BROKE OFF LUBRICATOR LOCKDOWN MANDREL AND CHECKED CLEANED AND LUBRICATED 9-5/8" ACME CONNECTION IN DUTCH RISER SYSTEM. -STABBED LOCKDOWN MANDREL AND RILDS. -FILLED LUBRICATOR WITH WATER AND ~ ~ PRESSURE TESTED LUBRICATOR TO 500-PSI. _ ~ GOOD TEST. 5/12/2010 j 00:00 - 08:00 8.00 RUNCOM ~ N DPRB RUNCMP RIH WITH SLICKLINE TOOL STRING AND ~ RETRIEVE RHC-M PLUG BODY. RIH WITH ~ ~ ! SLICKLINE TOOL STRING WITH 3.65" O.D. DRIFT TO 12203'. RIH AND SET NEW RHC-M PLUG _ ___ BODY AT 12111'. _ 08:00 - 10:00 2.00 RUNCMM P ____ RUNCMP RIG DOWN SLICKLINE UNIT. CLEAR AND CLEAN FLOOR. Printed 6/9/2010 11:06:18AM r~ r North America -ALASKA - BP Page 21 of 21 Operation Summary Report Common Well Name: 04-29_DIMS AFE No Event Type: WORKOVER (WO) Start Date: 4/27/2010 End Date: 5/13/2010 X4-OOPPJ-E (2,871,000.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: DOYON 141 Spud Datelfime: 11/13/1985 12:0O:OOAM Rig Release: 5/13/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: ORIG KELLY BUSHING @60.1ft (above Mean Sea Level) Date From - To _ Hrs _ (hr) Task Code NPT NPT Depth _ (ft) Phase Description of Operations 10:00 - 13:30 3.50 RUNCOM P RUNCMP PUMP 570 BBLS INHIBITED SEAWATER AT 3 BPM __ __ __ _ _ _ __ _ WITH 300 PSI. _ 13:30 16:00 2.50 RUNCMM P ~ RUNCMP DROP BALL AND ROD. PRESSURE UP TO 3500 PSI. SET PACKERS. CONTINUE TO HOLD 3500 PSI AND TEST TUBING FOR 30 CHARTED ~ ~ ~ MINUTES. BLEED TUBING PRESSURE TO 1600 PSI. PRESSURE ANNULUS TO 3500 PSI AND TEST FOR 30 CHARTED MINUTES. BOTH TEST FLAT LINE. BLEED OF TUBING PRESSURE, OBSERVE SHEAR WITH 1600 PSI ON TUBING. RIG UP AND PUMP DOWN ANNULUS AT 2 BPM WITH 80 PSI, VERIFY RETURNS. PUMP DOWN TUBING AT 2 BPM WITH. 9Q PSI, VERIFY _______ _ , _ RETURNS. SHEAR VALVE CLEAR. 16:00 - 17:00 1.00 RUNCOM P RUNCMP _ SET TWC. TEST FROM BELOW TO 1000 PSI FOR i 10 MINUTES AND 3500 PSI FROM ABOVE FOR 10 ~ MINUTES. BOTH TESTS OK. _____ 17:00 - 19:30 2.50 _ RUNCMM P __ RUNCMP B LOW DOWN LINES AND DRAIN BOP STACK. ' V NC LEAI<IN(; VERY SI IC;HTI Y INTO BOP STACK. PRESSURED I/A UP TO 300-PSI AND SHUT SAME IN TO TRAP PRESSURE ~ AND HOLD TWC POPPET CLOSED. TWC _ ___. ___ _ _ STOPPED LEAKING. __ ~ 19:30 - 21:00 1.50 BOPSUR P RUNCMP PJSM. NIPPLE DOWN BOPE. 21:00 - 00:00 3.00 BOPSUR P RUNCMP NU 4-1/8" 5M CAMERON PRODUCTION TREE AND 13-5/8" 5M ADAPTER FLANGE. TESTED _ _ _ HANGER VOID TO 5000-PSI O.K. 5/13/2010 00:00 - 01:00 1.00 RUNCMM P _ RUNCMP _ PJSM. PRESSURE TESTED PRODUCTION TREE __ TO 5000-PSI FOR 10-MINUTES. GOOD TEST. 01:00 - 03:00 2.00 RUNCOM P __ _ RUNCMP pUMU VALVE SHOP LUBRICATOR TO SWAB VALVE. PRESSURE TESTED LUBRICATOR TO 500-PSI. PULLED TWC. LAYED LUBRICATOR _ _ DOWN. ~ 03:00 - 04:30 1.50 RUNCOM P RUNCMP REVERSE CIRCULATE 150-BBLS. 70F DIESEL AT - i31AIG AND I/A _ ____ _ _ TAKING RETURNS TO ROCK WASHER. 04:30 - 06:00 i 1.50 RUNCOM P _ RUNCMP _____ U-TUBE DIESEL FROM I/A TO TUBING. --- - 06:00 - 09:00 ~ 3.00 RUNCOM i , p - ~ RUNCMP RIG DOWN LRS. SECURE TREE. INTALL VALVES AND GAUGES. RELEASE RIG AT 09:00 HOURS. Printed 6/9/2010 11:06:18AM TREE = CIW WELLHEAD = FMC ACTUATOR = OTIS KB. ELEV _ 60' BF, ELEV = KOP - 1875' Max An le = 98° 13900' Datum MD = 12412' Datum TVD = 8800' SS O ~ -2 9A S2404TY~ 2" CHHROME TBG &F7L" CHROME LNR "~~ ORIG WELLBORE NOT SHOWN BELOW 04-29A MILLOUT 04-29AL1 wlNDOw~~• tu. , - =Y 9-518" CSG PATCH , 47#, L-80, ID=8.681" I~ 1$65' 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 2550' Minimum ID = 2.37" @ 12202' 4-1 /2" GS FN 9-5/8" X 7" TM/ HLP PKR, ID = 6.184" 9977' 9-5/8" X 7" TM/ DTH HGR, ID = 6.113" 9982' 9-5/8" CSG, 47#, L-80 BTC, ID = 8.681 " 10174' 7" LNR, 29#, L-80 NSCC XO TO 13CR-80 NSCC 11833' 4-112" TBG, 12.6#, 13CR-80 VAM TOP, 12122' ,0152 bpf, ID = 3.958" 4-1/2" TBG STUB (05/05/10) 12127' TOP OF 2-7/8" LNR I~ 12203, 7" MARKERJOINT 12220' 4-1/2" TBG, 12.6#, 13CR-80 NSCT, 12254' .0152 bpf, ID = 3.958" FLOW-THRU WHIPSTOCK (11/18/00) 124$8' 7" X 4-1/2" TNV SS PKR w / XO, ID = 3.923" 12541' PERFORATION SUMMARY REF LOG: BHCS 12/01/95 ANGLE AT TOP PERF: Note: Refer to Production DB for historical pert data SIZE SPF ZONE INTERVAL Opn/Sqz DATE 2" 6 23P 12236 - 12250 C 06/03/05 2" 6 12250 - 12260 C 05/15/05 2" 6 12286 - 12296 C 05/15/05 3-3/8" 4 14P 12492 - 12530 C 05/16/96 4-1/2" SLTD 12628 - 13827 SLOT 12/18/95 2-7/8" SLTD 12968 - 13886 SLOT 11/24/00 7" LNR, 29#, 13CR-80, .0371 bpf, ID = 6.184" ~-j 12628' 4-1/2" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" 12628' 4-1/2" SLTD LNR, 12.6#, 13CR NSCT, 13827' .0152bpf, ID = 3.958" 4-1/2" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" 13870' -i 1$18' ~~ 9-518° NES ES CEMENTER 1$40' 13-3l8" x 9-5i8" BKR ISO-ZONE ECP, ID = 8.70'° - 2,115' 4-112„ 'X' NIPPLE 3.812„ GAS LIFT MANDRELS MD TVD DEV TYPE VLV LATCH PORT DATE 3893 3511 52 MMG DOME RK 16 05/16110 7317 5505 53 MMG SO RK 20 05/16/10 9610 6926 56 MMG DMY RK 0 9$03" ~ 4-112" 'X' NIPPLE 3.812" 9832` 9-5/8" x 4-112" HES TNT PKR; iD = 3.903„ 11977" 4-112" 'X' NIPPLE 3.812„ 12006' 7" x 4-112" HES TNT PKR, ID = 3.856" 12041 ° 4-1/2" 'X' NIPPLE 3.812" 12191' 4-112"'XN'NiPPLE3.725" 12137' 7" X4-1/2" UMIOVERSHOT 12168' ~-j 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 12203' 3-3/4" BKR DEPLOY SLV, ID = 3.00" 12208' 3-3/4" X 2-7/8" XO PIN, ID = 2.441 12241' 4-1/2" HES X NIP, ID = 3.813" (BEHIND LNR) ' 1-14-1/2" WLEG (BEIiIND 7" MILLOUT WINDOW (04-29AL1) 12482' - 12488' I'~ = Ilan I ~. I I ~ ~~,29L1 I I I I 2-7/8" LNR, 12968' , I I L-80 STL, 6.16#, , I I .0058 bpf, ID = 2.441" 014-29th 2-7/8" SLTD LNR, 6.16", L-80, 13886' ~~ ~ .0058 bpf, ID = 2.441" 2-7/8" LNR, 6.16#, L-80 STL, .0058 bpf, ID = 2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS 12/14/85 PKR 191 ORIGINAL COMPLETION 05/18/10 RCT/SV GLV C/O (05/16/10) 04/17/86 WW1 RWO 12/25/95 N2ES SIDETRACK (04-29A) 11/25/00 NOR 1 CTD SDTRACK (04-29AL1) 05/13/10 D141 RWO 05/18/10 SV DRLG HO CORRECTIONS 13888' I~ PBTD PRUDHOE BAY UNff WELL: 04-29AL1 PERMff No: "2001780 API No: 50-029-21453-60 SEC 35, T11N, R15E, 261' FNL & 503' FWL BP Exploration (Alaska) 04-29 BOP Testing Requirements (Sundry 310-114) PTD 195-172 Page 1 of 1 Schwartz, Guy L (DOA) From: Bjork, David (Northern Solutions) [David.Bjork@bp.com] Sent: Thursday, May 06, 2010 3:46 PM To: NSU, ADW Drlg Rig 141; Reem, David C; Willingham, James M; Sarber, Greg J; Crane, Lowell R; Engel, Harry R; Schwartz, Guy L (DOA) Cc: Bjork, David (Northem Solutions) Subject: 04-29 BOP Testing Requirements (Sundry 310-114) PTD 195-172 Doyon 141 has reached the time limit of their 7 day BOPE Test cycle on 05-06-10. 06:30 AM 05/05/10 AOGCC was provided with 24 hour notice of the impending BOPE Test. 06:30 AM 05/06/10 AOGCC was updated that we would be ready to test in ~10-12 hrs. 13:00-14:00 on 05/06/10, unable to reach an AOGCC inspector. 15:30 BP WSL Bill Burson discussed the situation with me in town. I in turn called Guy Schwartz, Senior Petroleum Engineer AOGCC and discussed the situation. He advised us to leave a message with the Slope AOGCC stating that we will be starting the ROPE test at 17:00 without witness unless otherwise directed by an inspector. Doyon 141 will start their BOPE test around 17:00 unless otherwise directed by the AOGCC or BPXA management. Please feel free to contact myself or Mr. Burson (659 4784) with questions or comments. Thanks, Dave Bjork 564-5683 440-0331 kx. +6ir 'or r w ~ac.:v 5/6/2010 Page 1 of 1 Schwartz, Guy L (DOA) From: Bjork, David (Northern Solutions) [David.Bjork@bp.com] Sent: Thursday, May 06, 2010 3:46 PM To: Schwartz, Guy L (DOA) Subject: RE: Doyon 141 BOP test Thanks for the help! From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Thursday, May 06, 2010 3:45 PM To: Bjork, David (Northern Solutions) Cc: Regg, James B (DOA) Subject: Doyon 141 BOP test Dave, Chuck Scheve is scheduled to be on the slope. He should be arriving this afternoon ... as we discussed on the phone if you can't get in contact with him the Commission will waive the right to test. (try one more time in the next hour or so ). Thanks for contacting us in town with your concern. Thanks, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) SI6/2010 • David Reem Engineering Team Leader r, ~ ~~ BP Exploration (Alaska), Inc ~~~~~,. "~~'~' ~' ~~ `~ P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-29A Sundry Number: 310-114 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ day of April, 2010. Encl. ~ STATE OF ALASKA ' ~~~' ALASK~L AND GAS CONSERVATION COMMISSN ~ APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 RECEIVE APR 0 8 2010 ~~~~o 1. Type of Request: ^ Abandon ^ Plug for Redrill ^ Perforate New Pool _ ®Repair Well ^ Change Approved Progra ^ Suspend ^ Plug Perforations ^ Perforate ®Pull Tubing ^ Time Extension ^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate _ ®Alter Casing ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. - ®Development ^ Exploratory 195-172 - 3. Address: ^ Service ^ Stratigraphic 6. API Number. P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21453-01-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 04-2~4 ~~ Spacing Exception Required? ^ Yes ®NO 9. Property Designation: 10. Field /Pool(s): ADL 028324 - Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. PRESENfiWELL CONDITION.SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13870' - 8877' - 13870' 8877' 12192' None Casin Len th Size MD ND Burst Colla Structural Conductor 2 1 4 Surface 5 13-3/ " 511' S0 1 Intermediate 1 174' - / " 174' 7 40' 7 47 Production liner 2659' 7" 9 ' - 12 8' 71 4' - 8 81 0 7 Liner 1 2 ' 4-1/ " 1541' - 1 7 ' 888 ' - 77' 84 7 0 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): Below Plug: 12628' - 13827' 8895' - 8877' 4-1/2", 12.6# 13Cr80 12254' Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV 12168' / 8736' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: May 1, 2010 ®Oil - ^ Gas ^ WDSPL ^ GSTOR ^ Abandoned 16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG Commission Representative: 17. I hereby certi t t the foregoing is true and correct to the best of my knowledge. Contact Hank Baca 564-5444 Printed Na a av' Re ~r Title Engineering Team Leader Prepared By Name/Number. Signature Phone 564-5743 Date ~ -~'x LajU Terrie Hubble, 564-4628 Commission Use Onl Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ~~ ~ ~' ` ^ Ptug Integrity ~ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ~ 35Gb ~~~ QaP ~ ~ Other. ,~. z .SG1D ~ nr. ~ ~ s ~ ~ ~ti Psc: Subsequent Form Required: f d • y DY APPROVED BY D t ~ ~ / a e Approved By: COMMISSIONER THE COMMISSION Form 10-403 ~9APR 1 4 ~//~k~ 5ubmft In Duplicate • by GP ~ 04-29AL1 Rig Workover (Repair IA x OA communication and production liner) Scope of Work: Pull 4.5" 13Cr-80 completion. Run USIT log to find TOC, cut and pull 9-5/8" casing as deep as possible. Tie back 9-5/8" casing and cement to surface. PU 9-5/8" packer and test casing from 9950' to surface. Suspected liner top leak. Isolate leak(s). Run and cement 7" scab to cover leak(s). Run 4.5"13Cr-80 completion. Engineer: Hank Baca MASP: 2271 psi Well Type: Producer Estimated Start Date: May 1st, 2010 Pre-Rig Work Request: S 1 Dum 20' of slu its on to of WRP @ 12,192'. Set 'unk catcher on to of slu its. F 2 MIT-T to 3500 si for 30 minutes. MIT-IA to 500 si for 10 minutes to verif barrier. E 3 Power Jet cut 4-'h" 13Cr-80 tubing at 12,128' MD, ~10' down first full joint above acker Reference tubin tall dated 12/22/95 . F 4 Circulate well with clean seawater and freeze rotect to 2000'. F 5 CMIT T x IA to 500 si for 10 minutes ost cut. 6 6 Check all lock down screws for free movement. Completely back out and check each lock down screw for breaka a check one at a time . PPPOT-T & IC. W 7 Set a BPV in the tubin han er. Proposed Procedure 1. MIRU. ND tree. NU and test BOPE (consisting of annular, 3-1/2" x 6" VBRs, blind/shear) to 250 psi low/3500 psi high. Circulate out freeze protection and circulate seawater. 2. Pull and LD tubing string to the cut. 3. Dress 4.5" tubing stub 4. RU wireline and run USIT from 3000' to surface. 5. Run 9-5/8" RBP and set 100' below TOC determined from USIT. PT RBP to 1000 psi to prove plug is set. Dump X50 ft of sand on RBP. Note: VBRs will not be changed to 9-5/8" as there are two tested barriers to the reservoir. 6. Mechanically cut 9-5/8" casing in 1S' full joint above top of cement. Pull casing through stack. Dress stub in preparation of casing overshot. 7. Run in with 9-5/8", 47#, L-80 casing and tie-in to dressed stub. 8. Cement new 9-5/8" casing to surface. 9. Drill out 9-5/8" float equipment. 10. Cleanout above 9-5/8" RBP. Test tieback to 3500 psi for 30 minutes. Pull 9-5/8" RBP. 11. PU 9-5/8" packer and RIH to 9950'. Test casing above to 3500 psi for 30 minutes to verify minor liner top leak. Move packer up hole to isolate leak if first test fails. 12. Run 7" 29# 13Cr-80scab liner to cover leak with adequate overlap. Length will be determined during step 11. • • 13. Cement 7" liner. 14. Drill out 7" float equipment. 15. Test scab to 3500 psi. 16. Recover 4.5"junk catcher 17. Run 4-~h" 13Cr-80 stacked packer completion 18. Displace the IA to packer fluid and set the packer. 19. Test tubing and IA to 3500 psi for 30 charted minutes. Freeze protect to 2,200' MD. 20. Set TWC. ND BOPE. NU and test tree. Pull TWC and set BPV. RDMO. ` ~~ i • TREe • cnv YlHtifhO- ~ AC:TL~1TOi2 • OTt5 ) 8F. EiF.' - I (COP • 1875' t3=~S C9G, 81' !/03x M,~k • 98° ;~y 1396C' a,Br, L•a0 BTG, t~1,m !A - ' 2412') D ~ 12A15• 2~3. 4:1 ttYLCT4R, 4 t 5#, t&4O, [) ~ 19,(24' 12t (3.318• C3£'a, 7211, L-8O, ~ * 12347- lVAinimum ID =2.37" a~ 122D2' -112" ~7JC ~~ 9.5.6' x7•TW 6PPKR D++8:184• 4-51a' X 7• TW Df61-fCaR. 47 «a.113 ~' ~ ~ ~ SAFETYI~JT€: FD~ZALV~LAt~alE}dU° DRrL;YJB.LBi~E KTT THG Bf1 04BAfdB.tDi1f Y!"' ~$` T x 5112' x 5»trz' x€a, o * 4.x92- ~• 5.112' X 4-tY2' xo, u3 +~ 3 4S8• 4-i.2' ~4>u1~TR13R4A 333V, #A • 3812' cAS Lff'f fMtl7Rfi5 T f~3 T'YD DB/ TYP€ VLV LATd3t t30.TE 1 3404. 3213 99 IyBX t7Aif BIQ 4 fYa123R07 2 ?312 550'2 ~ taBx flMY BK2 0 Oa123A7 3 940( 88(14 53 f1~tx ice' BOQ 0 3.[t7 i 1(15±'4 7474 43 KBG213 •DdYIY tYT 0 5 1119+0 79x0 34 tCBC,2~13 '~6AY M 0 12.'28867 g t1 8323 3a KBG~t3 `~Y NOT 0 M ' lDTE: PRD~.EtA MAC; SPECIAL VALVi~ r "~TAI<M5 * DMid EMEt,D~PAd]CNG ~ 3PEt1AL NDGO 4. 9=5.6• rAbi~nrr (a4.s4A~ 1tOf74'=16239 ~ y 12188" x 4 yr ercR s-3 PKR, o ~ 3875• BCR D~.oY ~rx, o x 2=718• xc~ PY.t ~ ~ ~ ~ xt~ o~3a13•{ I I I I I I I ~ I I 7• t1~tR 2918 tats-ea, .x+71 r~pa, o ~~.1a.~- 1~;2~ I I flW-29p- 4-t ~2' 01~1R,12.e11, Y3CRO~i3GT~ .01~pfi, o ~+ 3.95x- 4 f12• SITD 1N2. t28~f, t 3CR O~B4:T. 1382f" ~tszspt, o * 3.95x- 4112 LhR, t1.~, 13CRhBGT..O15afprf, tD* 3.95a• 13870' 7•t~t~;Jr {aa•29,1~t} 124x2•- 1~9aa` t14-29AL1 "L6~R, 12988' • S~iL, 6.18s, t~sf, 87 x 2441' - ~.TO Lb~t, e, fs•, L:atb, 13886' 6 ept, o» 2441• 2?la' t66t, 8~t8tt, 4so $7L. _aoaa eb~t. 02.4;1• DATE REV BY ~tAidENT3 DATE REV BY COItA~lER103r i21t4.65 I+fCR fat O11ML CDMPLEF6OH (2,'28107 K3B~llbi V (70 0+11t71a8 t2Y15145 WWt #i2E3 laMO ~OEFO>y-CK~Od-29Aj tN&~[t4If18 08818/08 'P.3C oRA QiA 1(125,+00 1 K{0429ALfy 0x128867 5WGSV QVC1p84ETW68y08124817} 11,"2aVC17 f7~JC QV aQfa2E{TD'Of34t69ZiXt7 BAY iJl•IT Y+al: O0.29ALt }'ER/A'C Nb; X601780 A A !d[t 50:029-2153-60 T1 tN, ROSE, 281` F'fL &503` PtlYL BP Ex}~erallaa~ {Atoka) 6 ._a_, ...w.,....... _a152 tblit, o # ~ 958• fLf]AN-TMWiSYNP3TOIX¢1111a8k6Y 1248 x ~-tn• Tarr ss PKR w 1 xea. o ~ 3.9z3- 12541' ~'~ ~ 04-29AL1 ~ P'OPOSED 13-3/8" CSG, 81' sa#, L-80 BTC, ~ -- 2000` 4-1/2" HES X NIP, ID = 3.813" ID = 12.415" from old TOC to surface GAS LIFT MANDRELS 13-3/8" CSG, 72#, L-80, ID = 12.347" ~--~ 2550' r Minimum ID = 2.37" @ 12202' 4-1 /2" GS FN 7" 29# chrome scab liner cmt'd 9600`-9978' ST MD TVD DEV TYPE VLV LATCH 1 3886 2 7300 3 9594 4 11090 5 11985 1/2" x 7" Halliburton TNT packer 4-1 /2" 12.6#/ft, 13Cr-80 VamTop tbg 9-5/8" CSG, 47#, L-80 BTC, ID = 8.681" ~~ 10174, 7" LNR, 29#, L-80 NSCC XO TO 13CR-80 NSCC 11833' TOP OF 2-7/8" LNR Unique chrome overshot 12168' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 12192' 4-1/2" WRP(08/24/07) 12203' 3-3/4" BKR DEPLOY SLV, ID = 3.00" 12208' 3-314" X 2-7/8" XO PIN, ID = 2.441 7" MA RKER JOINT i~ 12220 4-1/2" TBG, 12.6#, 13CR-80 NSCT, 12254' .0152 bpf, ID = 3.958" FLOW-THRU WHIPSTOCK (11/18/00) 12488' 7" X 4-1 /2" TNV SS PKR w / XO, ID = 3.923" 12541' PERFORATION SUMMARY REF LOG: BRCS 12/01/95 ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF ZONE INTERVAL Opn/Sqz DATE 2" 6 23P 12236 - 12250 C 06/03/05 2" 6 12250 - 12260 C 05/15/05 2" 6 12286 - 12296 C 05/15/05 3-3/8" 4 14P 12492 - 12530 C 05/16/96 4-1/2" SLTD 12628 - 13827 SLOT 12/18/95 2-7/8" SLTD 12968 - 13886 SLOT 11/24/00 7" LNR, 29#, 13CR-80, .0371 bpf, ID = 6.184" 1/2" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" 4-1 /2" SLTD LNR, 12.6#, 13CR NSCT, 13827' .0152bpf, ID = 3.958" 4-112" LNR, 12.6#, 13CR NSCT, .0152bpf, ID = 3.958" 13870' 12241' 4-1/2" HES X NIP, ID = 3.813" (BEHIND 14-1/2" WLEG (BEHIND LNR) I ~u 7" MILLOUT WINDOW (04-29AL1) 12482' - 12488' ~. I ~I I `' I I a4;29AL1 13888' PBTD .~ I I 2-7/8" LNR, 12968' I I L-80 STL, 6.16#, I I .0058 bpf, ID = 2.441" 014-2914 2-7/8" SLTD LNR, 6.16", L-80, 13886' ~) I .0058 bpf, ID = 2.441" 2-7/8" LNR, 6.16#, L-80 STL, 13922' .0058 bpf, ID = 2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS 12/14/85 PKR 191 ORIGINAL COMPLETION 12/26/07 KSB/TLH GLV GO 04/17/86 WW1 RWO 06/04/08 RGPJC DRAWING CORRECTIONS 12/25/95 N2F~ SIDETRACK(04-29A) 06/06/08 RGPJC DRAWING CORRECTIONS 11/25/00 NOR1 CTDSDTRACK(04-29AL1) 08/26/07 SWGSV GLV GO & SET WRP(08/24/07) 11/28/07 RGPJC GLV CORRECTIONS (08/23/07) PRUDHOE BAY UNIT WELL: 04-29AL1 PERMIT No: `2001780 API No: 50-029-21453-60 SEC 35, T11N, R15E, 261' FNL & 503' FWL BP Exploration (Alaska) Schwartz, Guy L (DOA) From: Baca, Hank [hank.baca@bp.com] Sent: Monday, April 12, 2010 2:21 PM To: Schwartz, Guy L (DOA) Cc: Bjork, David (Northern Solutions) Subject: RE: 04-29A~ RWO (-~~8-~66=1~8) ~ ~ ~ 5 ~ 7Z' Page 1 of 1 Guy, if you take a look at pre-rig step 2 in what we filed you'll notice we're getting a new MIT-T and verifying an IA barrier to 500 psi. That work has not been completed yet. The IA leak rate was too small to measure @ 3000psi last time it was checked. Tubing held to 3000 psi last time we checked. Both those tests were done in 2007 and need to be redone. A leak detect log showed a leak @ 9974' which is suspiciously close to liner top packer depth. Step 5 in the main procedure is testing a 9.625" bridge plug @ probably 2500'. If the pre-rig IA test fails we'll move the packer test up from step 11 in rig portion of the program and find our leak(s). Terrie left copies of the 2 sundries she filed for this well on my desk, so you should already have the dual paperwork. Hope that answers your questions. Dave Bjork will be taking this well so let him know if it doesn't. Thanks, Hank Baca Drilling Engineer 907-564-5444 of1'ICe 907-748-0997 cell From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Monday, April 12, 2010 1:54 PM To: Baca, Hank Subject: 04-29AL1 RWO (PTD 200-178) Hank, In reviewing the RWO I did't see the current CMIT results listed. You state a IA X OA leak but don't indicate the rate loss or where it is located in the 9 5/8" casing. Will it hold 1000 psi ??? (ie step #5) Is the OA arctic packed?? Was curious as to what evidence there was for the liner lap leak too. Could you elaborate on this.... In addition the Sundry is written under the L1 lateral PTD. The motherbore PTD 04-29A) would be more appropriate but in reality the wellwork should be reported for both PTD numbers. Please submit another sundry for 04-29A . At completion wellwork reports (404's) will be needed for both motherbore and 04-29AL1. I realize this is some duplication but it keeps our well records complete. Don't hesitate to call if you have any questions. Thanks in advance. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 4/12/2010 ON OR BEFORE c:LOP. IXI~ILM'DOC F' F F,: H I T ['.'.,, A T A Y D k T A P L. tJ S 95-~ 172 GR/'EWRa--HD 8a..., .... i72 9 5 --~ 'i 7 2 7/Lt 7 5 ~ R E S/' ,3 F,: T .. 1/14/97 I GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10698 Company: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia Disk D.S. 1-19. 97001 CNTG -';tg- "'~1 ~' 961208 1 D.S. 1-19 CNTG 961208 1 1 D.S 1-10A PRODUCTION PROFILE W/DEFT 961 203 I 1 ,, D.S. 1-23 PRODUCTION PROFILE LOG 961 212 1 1 .... PWDW 2-1 STATIC TEMP-PRESS SURVEY 961204 1 1 D.S. 4-19 INJECTION STEP RATE TEST 961 201 1 1 D.S. 4-29A .I GAS LIFT SURVEY 961 206 1 1 D.S. 9-47 ..... ]PRODUCTION PROFILE 9611 30 I 1 D.S. 9-50 PRODUCTION PROFILE 961 21 3 1 1 , . D.S. 17-13 GAS LIFTSURVEY 961205 I 1 q,~ -- 17/_~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - DS 4-29A AK-MM-951265 September 3 0, 1996 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted magnetic tape with LIS listing. RECEIVED OCT 0 5 ]996 AJaska Oil & Gas Cons. CommJsst~ An~orage 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dre..q_qc.r Ind~ ~.qtrica_q Inn WELL LOG TRANSMITTAL To: State of Alaska August 14, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - DS 04-29A, AK-MM-951265 -' The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention off Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 DS 04-29A: c~ 5'- I ~ 7_. 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-21453-01 2"x 5" TVD Resistivity and Gamma Ray Logs: 50-029-21453-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company ,, '::GeoQuest 1500 W. International Airport [load "i'.'Anchorage, AK 99518-1199 ATIN: Sherrie NO. 10237 Company: Alaska Oil & Gas Cons Comm Attn: Howard Oakland 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bsy 6/1 3/96 Anadrill Anadrill Well Job # Lo§ De~cription Date BL RF Sepia Survey Program Calculation D.S. 1-11 ~[.:2._~!=';~' 96103 I)UALBURS',"I' ,t).S. 1-4 .... '~ ~'~.._. .X(~, I'EFII= HECORi.) 'b.s. 1-8 ___2..~":.: 2J,, .......... ---~iii li~IJFC PROFII. E ' ~).S. 2-3A __~..~='J[_7 ~ I:'ROD PROFII .,E - ' D.S. 2-3A ({ ~'":- ( 'l ~ DUAL BURST T~ ~D.S. 2-18A ~'£=_Q~,~, _I'RODPROFII~E "D.S. 2-32 c/l, l[~ GAS DETEC'['IOt, 'D.S. 2-35 ~1 ;' 1,1,") -[,EAK DETECTI-~} l~.S.' 3-14 '~. o~,1. 'PERFRECORD ~.S. 3-36 ~/$..~ !{ PERFRECORD ~.S. 4-29A ~l,~-. /'/.3 pERFRECORD- ~.S. 5-5A <IV- O'7 i, [)UAL BURST TI O.S. 5-11 '~ ? 0 ~ CHEMICAL c[rn ~'O.S. 7-6A qF. I~ 7 DUAL BURST T---I---- 'l~.S. 13-06 ,~£-i1~ INJECPROFII.E 'i~.S. 13-18 ~,- ~ ) ~ INJEC PROFII.E ' - O.S. 15-08A ~J) -! )'/ !LEAK DETECTIC~ 'p.s. 15-28 ~J/L- 0~:;' LEAKDETECTIO D.S. 15-32 ~,¢ 0¥? PERFRECORD /D.S. 17-21 ~,-i,Z}'" I.EAKDETECTIG 'D.S. 18-31 ~'i' 112<t' [)UAL BURSTT/ ,. ~)'i'-P 960401 , ~ 960528 1 1 ..................... 960519 1' 1 960531 I 1 i:?.;!ii-P (BORAX). 960601 I I 96O518 I 1 ,! 96O53O I 1 !__N 960525 I I "' ., 960526 I 1 960523 1 I ._ 960516 I 1 )'J~-P (BORAX) 960520 1 1 'ER RECORD 96 0528 I I .... )_-_r-P (BORAX) 96051 5 I 1 .... 960524 I 1 960527 I 1 .~"'__. 960526 1 I .......... _1~._ 960516 I I ..... .... 960517 I 1 i_kl_ 96051 9 I I ...... )T-P (BORAX) 960521 I I Li?,.:,:r,'Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. Anaddll Performance Lett~'~,,r Floppy Disk .,~'.,fasJ~=~)ii & (i.~ Cc,is. ' ' ' · STATE OF ALASKA ALASKA .-AND GAS CONSERVATION CO~v,,,/IISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing After casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 261' FNL, 503' FWL, Sec 35, T11 N, R15E, UM. At top of productive interval 1216' SNL, 2670' EWL, Sec 36, T11N, R15E, UM. At effective depth At total depth 1136' SNL, 4200' EWL, Sec 36, T11 N, R15E, UM. 5. Type of Well Development Exploratory Stratigraphic Service ORIGINAL 6. Datum of elevation(DF or KB) 6O RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-29A 9. Permit numbedapproval number 95-172 10. APl number 50 - 029-21453-01 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 13870 feet Plugs(measured) 8876 feet Effective depth: measured 13870 feet true vertical 8876 feet Junk(measured) Casing Length Size Cemented Measured depth Conductor 120' 20" 1830# Polyurethane 120' Surface 2490' 13-3/8" 2500 Sx AS III, 501 Sx AS II 2550' Production 10114' 9-5/8" 500 Sx CIG & 300 Sx AS I 10174' Liner 2659' 7" 500 Sx CIG 12628' Slotted Liner 1329' 4-1/2" Uncemented 13870' True vertical depth 120' 255O' 7239' 8894' 8876' Perforation depth: measured 12492 - 12530'; Slotted Liner: 12628- 13827' true vertical 8881 - 8890'; Slotted Liner: 8895 - 8877' Tubing (size, grade, and measured depth) 7" Tbg @ 28' MD; 4-1/2", 12.6#, 13 CR-80 Tbg @ 12254' MD. Packers and SSSV (type and measured depth) Baker S-3 Packer @ 12168' MD; Camco TRDP-4A SSSV @ 2200' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure I~, EL.. E I V E IJ JUN 0 4 i996 Alaska 011 & {3a~ Con~. Cornmm~or, 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 745 4575 113 -- 1157 4982 320 -- Anchorage Tubing Pressure 243 277 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed "~-,'~-, ")/'h, ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 Date ,,5-..,2/¢- ~'/~ SUBMIT IN DUPLICATE ~:~ 4-29A PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 5/1 6/96: MIRU & PT equipment. RIH w/perforating gun & shot 38' of add perforations as follows: Added perforations: 12492 - 12530' MD (Zl) Used 3-3/8" carriers & shot 4 spf at 180 degree phasing at underbalanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. Placed the well on production w/gas lift & obtained a valid welltest. RECEIVED ,JUN 0 4. 1996 Alaska Oil & Gas Cons. Comrnissi(m Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL, COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 95-172 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5 o - 029-21453-01 4. Location of well at surface 9. Unit or Lease Name 261'SNL, 503' EWL, SEC. 35, T11N, R15E .. !~ Prudhoe Bay Unit At Top Producing Interval 2~~'~'/''~-''4' ~[~ !i 10. Well Number 1216' SNL, 2670' EWL, SEC. 36, 711N, R15E '/' !! ~ ; 4-29A t''' 11. Field and Pool ,"~'~,,~//--- ~'.:'-.' ~ ~~~~_,! Prudhoe Bay Field/Prudhoe Bay Pool At Total Depth 1136' SNL, 4200' EWL, SEC. 36, T11N, R15E 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE -- 60' ADL 028324 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 12/04/95 12/17/95 12/25/95I N/A feet MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD', 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafros t 13870' MD / 8876' TVD 13870' MD / 8876' TVD YES [] NO [] 2200 feet MD 1900'(Approx.) 22. Type Electric or Other Logs Run MWD, LWD, CDL, CNL, DLL, MLL, GR, RES 23. CASING. LINER AND CEMENTING RECORD SE[TING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTFOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 120' 30" 1830# Polyurethane 13-3/8" 68#/72# K-55/L-80 Surface 2550' 17-1/2" 2500 sx AS III, 400 sx AS II. 101 sx AS I 9-5/8" 47# L-80 Surface 10174' 12-1/4" 500 sx Class 'G' 7" 29# 13Cr/L-80 9969' 12628' 8-1/2" 500 sx Class 'G' 4-1/2" 12.6# 13Cr-80 12541' 13870' 6" Uncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and Bottom and :)5. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Slotted Liner 4-1/2" 12254' 12168' MD TVD :)6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12628'- 13827' 8895'- 8877' Freeze Protected w/120 Bbls Diesel 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) December31, 1995 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF ~/ATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing !Casing Pressure CALCULATED OIL-BBL GAS-MCF ~/ATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. FEB 1 6 1996 Alaska Oil & Gas Cons. Commissio~ Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sad/erochit 12225' 8771' Top Zone 2A 12291' 8807' Top Zone lB 12345' 8833' 31. LIST OF A'I-I'ACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ,zL/'(-/-/,c4J~.. ~ . __ Title Senior Drilling Engineer Date -'~ - ?,¥' - 7(~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". FEB 1 6 Form 10-407 Gas Cons. Commission SUMMARY OF DAILY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: Accept Date: 4-29A Rig Name: Nabors 2 ES AFE: 1 1-27-95 Spud Date: 12-04-95 Release Date: 4J0301 12-25-95 Nov 27 1995 (1) Rig moved 25 %. Nov 28 1995 (2) Rig moved 100 %. Rigged up Drillfloor / Derrick. Fill pits with Seawater. Worked on BOP - Lubricator. Held safety meeting. Lu- bricate well. Rigged up Internal BOPs. Removed Xmas tree. Nov 29 1995 (3) Removed Xmas tree. Rigged up BOP stack. Tested BOP stack. Held safety meeting. Held drill (H2S). Tested Failsafe valves. Rigged up Lubricator. Retrieved Tubing hanger. Rigged down Lu- bricator. Installed Drillpipe retrieval string. Pulled Tubing hanger. Retrieved Tubing hanger. Rigged down Tubing handling equipment. Circulated at 12560 ft. Installed BOP test plug as- sembly. Tested BOP stack. Retrieved BOP test plug assembly. Held safety meeting. Laid down Tubing to 10000 ft. Held safety meeting. Held drill (Spill). Laid down Tubing to 9000 ft. Rigged up Tubing handling equipment. Laid down Tubing to 7000 ft. Nov 30 1995 (4) Laid down Tubing to 0 ft. Rigged down Tubing handling equipment. Installed Wear bushing. Rigged down sub-surface equipment - Oth- er sub-surface equipment. Rigged down Kelly. Held safety meet- ing. Held drill (Fire). Rigged up Kelly. Made up BHA no. 1 . Singled in drill pipe to 2000 ft. Rigged up Kelly. Serviced Block line. Singled in drill pipe to 10445 ft. Set Cement re- tainer at 10445 ft with 0 psi. Circulated at 10445 ft. Held safety meeting. Held drill (Kick while tripping). Circulated at 10445 ft. Pulled out of hole to 2000 ft. Dec I 1995 (5) Pulled out of hole to 645 ft. Pulled BHA. Made up BHA no. 2 . R.I.H. to 9174 ft. Held safety meeting. R.I.H. to 10174 ft. Milled Casing at 10174 ff. Well Name: 4-29A Page 2 Dec 2 1995 (6) Milled Casing at 10239 ft. Circulated at 10239 ft. Pulled out of hole to 679 ft. Pulled BHA. R.I.H. to 2000 ft. Serviced Block line. R.I.H. to 10239 ft. Circulated at 10239 ft. Held safety meeting. Mixed and pumped slurry- 36 bbl. Displaced slurry- 128 bbl. Held 1500 psi pressure on 5 bbl squeezed ce- ment. Pulled out of hole to 5 ft. Pulled BHA. Installed Seal assembly. Dec 3 1995 (7) Installed Seal assembly. Repaired Rotary table. Removed Bore protector. Removed Seal assembly. Installed Seal assembly. Tested All functions. Installed Bore protector. Repaired Rotary table. Dec 4 1995 (8) Repaired Rotary table. Made up BHA no. 4. R.I.H. to 10179 ft. Drilled to 10239 ft. Drilled to 10569 ft. Dec 5 1995 (9) Drilled to 11008 ft. Circulated at 11008 ft. Pulled out of hole to 10174 ft. R.I.H. to 11008ft. Drilled to 11008 ft. Dec 6 1995 (10) Drilled to 12137 ft. Circulated at 12137 ft. Pulled out of hole to 10174 ft. Flow check. Pulled out of hole to 8000 ft. Dec 7 1995 (11) Pulled out of hole to 675 ft. Pulled BHA. Made up BHA no. 5 . R.I.H. to 10170 ft. Serviced Block line. R.I.H. to 12137 ft. Drilled to 12319 ft. Dec 8 1995 (12) Drilled to 12349 ft. Circulated at 12349 ft. Pulled out of hole to 250 ft. Pulled BHA. Made up BHA no. 6. R.I.H. to 10170 ft. Serviced Block line. R.I.H. to 12349 ft. Drilled to 12460 ft. Dec 9 1995 (13) Drilled to 12630 ft. Circulated at 12630 ft. Pulled out of hole to 10174 ft. R.I.H. to 12630 ft. Circulated at 12630 ft. Pulled out of hole to 300 ft. Pulled BHA. Held safety meeting. Alaska Oil & Gas Cons. Anchorage Well Name: 4-29A Page 3 Dec 10 1995 (14) Held safety meeting. Rigged up sub-surface equipment - Formation logs. Ran electric logs. Rigged down sub-surface equipment- Formation logs. Made up BHA no. 7. R.I.H. to 10174 ft. Ser- viced Block line. Dec 11 1995 (15) R.I.H. to 12250 ft. Reamed to 12382 ft. Circulated at 12382 ft. Reamed to 12630 ft. Circulated at 12630 ft. Pulled out of hole to 11630ft. R.I.H. to 12630 ft. Circulated at 12630 ft. Pulled out of hole to 250 ft. Pulled BHA. Held safety meeting. Rigged up Casing handling equipment. Ran Casing to 2650 ft (7 in OD). Circulated at 2650 ft. Ran Casing on landing string to 365O ft. Dec 12 1995 (16) Ran Casing on landing string to 10174 ft. Circulated at 10174 ft. Ran Casing on landing string to 12630 ft. Circulated at 12630 ft. Mixed and pumped slurry- 106 bbl. Displaced slurry - 229 bbl. Reverse circulated at 9977 ft. Pulled Drillpipe in stands to 7971 ft. Serviced Block line. Pulled Drillpipe in stands to 0 ft. Tested All functions. Dec 13 1995 (17) Rigged down High pressure lines. Tested Casing. Tested Casing. Pulled out of hole to 0 ft. R.I.H. to 7000 ft. Tested Casing. Pulled out of hole to 7000 ft. Dec 14 1995 (18) Pulled out of hole to 0 ft. Made up BHA no. 8. R.I.H. to 9971 ft. Milled Other sub-surface equipment at 9971 ft. Circulated at 9971 ft. Serviced Block line. Pulled out of hole to 0 ft. Pulled BHA. Made up BHA no. 9. R.I.H. to 9969 ft. Set Tie back packer at 9969 ft with 0 psi. Tested Casing - Via annulus and string. Pulled out of hole to 250 ft. Pulled BHA. Well Name: 4-29A Page 4 Dec 15 1995 (19) Pulled BHA. Made up BHA no. 10. R.I.H. to 2500 ft. Held safe- ty meeting. R.I.H. to 7000 ft. Serviced Block line. Held drill (Kick (well kill)). Held drill (Stripping). R.I.H. to 12342 ft. Drilled installed equipment - Float shoe. Drilled to 12638 ft. Circulated at 12638 ft. Drilled to 12725 ft. Dec 16 1995 (20) Drilled to 13124 ft. Pulled out of hole to 9000 ft. R.I.H. to 13124 ft. Drilled to 13564 ft. Circulated at 13564 ft. Dec 17 1995 (21) Circulated at 13564 ft. Logged hole with LWD: Formation evalua- tion (FE) from 13564 ft to 12628 ft. Pulled out of hole to 4000 ft. Serviced Block line. Pulled out of hole to 200 ft. Pulled BHA. Made up BHA no. 11. R.I.H. to 13564 ft. Drilled to 13749 ft. Circulated at 13749 ft. Dec 18 1995 (22) Circulated at 13749 ft. Pulled out of hole to 250 ft. Pulled BHA. Made up BHA no. 12. R.I.H. to 13749 ft. Drilled to 13870 ft. Circulated at 13870 ft. Pulled out of hole to 12628 ft. Serviced Block line. R.I.H. to 13870 ft. Circulated at 13870 ft. Dec 19 1995 (23) Pulled out of hole to 4500 ft. Flow check. Dec 20 1995 (24) Flow check. Rig waited: Weather. Dec 21 1995 (25) Rig waited: Weather. Pulled out of hole to 200 ft. Pulled BHA. Held safety meeting. Held drill (Fire). Installed BOP test plug assembly. Tested BOP stack. Retrieved BOP test plug assembly. Installed Wear bushing. Made up BHA no. 13. R.I.H. to 12625 ft. Circulated at 12625 ft. R.I.H. to 13870 ft. Circulated at 13870 ft. Held safety meeting. Held drill (Fire). Circulated at 13870 ft. Pulled out of hole to 2300 ft. Well Name: 4-29A Page 5 Dec 22 1995 (26) Pulled out of hole to 1500 ft. Pulled BHA. Rigged up Casing handling equipment. Ran Casing to 1300 ft (4.5 in OD). Ran Tub- ing on landing string to 1300 ft. Held safety meeting. Held drill (Spill).-Ran Tubing on landing string to 1300 ft. Rigged down sub-surface equipment- Casing. Rigged up sub-surface equipment - Liner hanger. Rigged down Casing handling equipment. Circulated at 1300 ft. Ran Casing on landing string to 12625 ft. Circulated at 12625 ft. Held safety meeting. Held drill (Spill). Circulated at 12625 ft. Ran Casing on landing string to 13870 ft. Circulated at 13870 ft. Set Liner hanger at 12541 ft with 3500 psi. Tested Packer assembly- Via annulus. Rigged down sub-surface equipment - Setting tools. Circulated at 13870 ft. Dec 23 1995 (27) Circulated at 13870 ft. Laid down Drillpipe to 12570 ft. Circu- lated at 12540 ft. Fill pits with Seawater. Held safety meet- ing. Held drill (Kick while tripping). Circulated at 12540 ft. Filter Seawater. Laid down Drillpipe to 12000 ft. Serviced Block line. Laid down Drillpipe to 4000 ft. Held safety meet- ing. Held drill (H2S). Laid down Drillpipe to 3200 ft. Repaired Cranes. Laid down Drillpipe to 0 ft: Rigged down sub- surface equipment - Setting tools. Retrieved Wear bushing. Rigged up Tubing handling equipment. Dec 24 1995 (28) Rigged up Tubing handling equipment. Ran Tubing to 2500 ft (4.5 in OD). Held safety meeting. Held drill (Spill). Ran Tubing to 9800 ft (4.5 in OD). Held safety meeting. Held drill (Fire). Rigged up sub-surface equipment - SCSSSV. Tested Single control line. Ran. Tubing to 12248 ft (4.5 in OD). Reverse circulated at 12248 ft. Well Name: 4-29A Page 6 Dec 25 1995 (29) Reverse circulated at 12248 ft. Installed Tubing hanger. Ran Tubing on landing string to 12254 ft. Tested SCSSSV control line. Ran Tubing on landing string to 12254 ft. Held safety meeting. Held drill (Fire). Installed Tubing hanger. Set pack- er at 12168 ft with 4000 psi. Tested Tubing. Tested Permanent packer - Via annulus. Retrieved Drillpipe landing string. In- stalled Hanger plug. Held safety meeting. Rigged down BOP stack. Held safety meeting. Held drill (Spill). Installed Adapter spool. Installed Xmas tree. Tested Adapter spool. Tested All tree valves. Retrieved Hanger plug. Rigged up High pressure lines. Tested Permanent packer- Via annulus. Freeze protect well - 85 bbl of Diesel. Dec 26 1995 (30) Freeze protect well - 120 bbl of Diesel. Installed Hanger plug. Rigged down High pressure lines. SHARED SERVICES DRILLING PBU/4-29A 5oo2921453o1 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 7/96 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 10179.00 7242.00 7182.00 10200.00 7254.11 7194.11 10208.41 7259.13 7199.13 10276.13 7302.28 7242.28 10308.21 7323.55 7263.55 10339.88 7344.71 7284.71 10371.10 7365.83 7305.83 10434.13 7410.31 7350.31 10528.80 7479.28 7419.28 10621.79 7547.15 7487.15 10715.87 7616.38 7556.38 10809.77 7686.50 7626.50 10904.31 7757.67 7697.67 10997.64 7828.24 7768.24 11090.61 7899.42 7839.42 11185.69 7973.21 7913.21 11280.18 8047.24 7987.24 11374.11 8122.19 8062.19 11468.79 8199.07 8139.07 11563.07 8275.95 8215.95 11594.55 8301.46 8241.46 11626.09 8326.86 8266.86 11657.92 8352.25 8292.25 11688.98 8376.79 8316.79 11721.33 8402.06 8342.06 11751.79 8425.59 8365.59 11782.17 8448.79 8388.79 11845.04 8496.02 8436.02 11876.65 8519.57 8459.57 11908.67 8543.42 8483.42 11938.08 8565.39 8505.39 11968.93 8588.49 8528.49 12000.85 8612.47 8552.47 12059.36 8656.18 8596.18 12107.60 8691.81 8631.81 RY-SUN DRILLINGANcHORAGE ALAsKASERVICES ~ ~// ~~/~GE DATE OF SURVEY: 121995 MWD SURVEY JOB NUMBER: AK-MW-50120 KELLY BUSHING ELEV. = 60.00 FT. OPERATOR: ARCO ALASKA INC COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 54 50 S 85.50 E .00 808.79S 6105.01E 6125.43 54 43 S 85.35 E .85 810.16S 6122.11E 6142.57 52 0 S 85.50 E 32.37 810.70S 6128.84E 6149.31 48 49 S 85.03 E 4.73 815.00S 6180.84E 6201.41 48 6 S 84.86 E 2.25 817.11S 6204.76E 6225.38 48 2 S 84.68 E .46 819.26S 6228.23E 6248.90 46 49 S 84.50 E 3.96 821.43S 6251.12E 6271.84 43 23 S 84.10 E 5.46 825.86S 6295.54E 6316.37 43 4 S 86.50 E 1.77 831.18S 6360.15E 6381.11 43 10 S 85.90 E .46 835.39S 6423.58E 6444.63 42 4 S 86.80 E 1.35 839.45S 6487.15E 6508.29 41 17 S 86.30 E .89 843.21S 6549.48E 6570.70 41 1 S 85.60 E .56 847.60S 6611.56E 6632.88 40 43 S 85.40 E .36 852.39S 6672.44E 6693.88 39 20 S 85.00 E 1.50 857.39S 6732.03E 6753.58 38 49 S 85.00 E .55 862.62S 6791.76E 6813.43 38 0 S 85.10 E .87 867.68S 6850.25E 6872.05 36 6 S 84.70 E 2.04 872.71S 6906.63E 6928.54 35 18 S 84.70 E .84 877.82S 6961.66E 6983.69 35 25 S 83.70 E .62 883.33S 7015.94E 7038.11 36 16 S 82.30 E 3.77 885.58S 7034.24E 7056.46 36 27 S 81.70 E 1.25 888.185 7052.76E 7075.05 37 42 S 81.50 E 3.98 890.99S 7071.74E 7094.10 37 56 S 81.00 E 1.23 893.88S 7090.57E 7113.00 39 17 S 80.30 E 4.42 897.17S 7110.49E 7133.01 39 34 S 79.50 E 1.91 900.56S 7129.54E 7152.15 40 49 S 79.60 E 4.09 904.12S 7148.82E 7171.52 41 46 S 79.80 E 1.54 911.53S 7189.65E 7212.54 41 55 S 80.60 E 1.75 915.12S 7210.43E 7233.42 41 45 S 80.70 E .54 918.59S 7231.50E 7254.58 41 34 S 80.90 E .79 921.72S 7250.80E 7273.96 41 27 S 81.00 E .42 924.94S 7270.99E 7294.24 41 9 S 80.40 E 1.58 928.34S 7291.79E 7315.12 42 9 S 80.40 E 1.73 934.825 7330.13E 7353.63 42 38 S 79.20 E 1.95 940.59S 7362.14E 7385.79 S~ RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SFLARED SERVICES DRILLING PBU/4-29A 500292145301 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 7/96 DATE OF SURVEY: 121995 MWD SURVEY JOB NUMBER: AK-MW-50120 KELLY BUSHING ELEV. = 60.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 12138.54 8714.44 8654.44 12170.23 8736.82 8676.82 12201.33 8757.25 8697.25 12232.23 8775.65 8715.65 12262.56 8792.28 8732.28 43 19 46 49 51 3 55 49 57 38 S 79.60 E 2.37 944.47S 7382 S 81.70 E 12.00 948.10S 7405 S 79.10 E 15.02 952.02S 7428 S 80.90 E 16.10 956.32S 7452 S 80.90 E 6.00 960.33S 7477 · 87E · 01E · 12E .55E · 59E 7406.62 7428.85 7452.06 7476.61 7501.75 12290.17 8806.71 8746.71 59 22 12326.26 8824.74 8764.74 60 40 12356.79 8838.87 8778.87 64 11 12388.64 8851.65 8791.65 68 27 12418.95 8862.09 8802.09 71 14 S 81.40 E 6.45 963.95S 7500 S 77.90 E 9.15 969.57S 7531 S 78.50 E 11.66 975.10S 7558 S 79.40 E 13.62 980.69S 7586 S 79.60 E 9.19 985.87S 7614 · 85E .59E · 08E · 71E .68E 7525.10 7555.99 7582.63 7611.40 7639.51 12449.67 8871.15 8811.15 74 28 12480.93 8878.64 8818.64 77 45 12511.91 8884.41 8824.41 80 47 12543.89 8889.28 8829.28 81 40 12575.24 8892.81 8832.81 85 24 S 84.00 E 17.28 990.05S 7643 S 85.50 E 11.48 992.82S 7673 S 85.90 E 9.86 995.11S 7704 S 85.20 E 3.52 997.56S 7735 S 86.20 E 12.31 999.89S 7766 .73E .94E .29E .80E .86E 7668.66 7698.94 7729.34 7760.91 7792.02 12592.52 8893.87 8833.87 12623.85 8894.54 8834.54 12655.57 8894.56 8834.56 12686.66 8894.57 8834.57 12718.16 8893.85 8833.85 87 31 90 0 89 56 9O 1 92 35 S 86.57 E 12.45 1000.98S 7784 S 87.22 E 8.15 1002.68S 7815 S 87.88 E 2.09 1004.03S 7847 S 88.52 E 2.08 1005.01S 7878 S 88.53 E 8.13 1005.82S 7909 .07E .34E .03E .10E .58E 7809.25 7840.56 7872.28 7903.37 7934.85 12749.44 8892.07 8832.07 12780.87 8889.95 8829.95 12812.78 8887.87 8827.87 12843.86 8885.95 8825.95 12876.52 8883.96 8823.96 93 93 93 93 93 55 S 89.20 E 4.76 1006.44S 7940 49 S 89.09 E .45 1006.90S 7972 38 S 89.60 E 1.70 1007.27S 8003 27 S 88.78 E 2.70 1007.71S 8035 31 S 87.82 E 2.94 1008.67S 8067 .80E .15E .99E .01E .59E 7966.08 7997.43 8029.27 8060.29 8092.88 12908.52 8882.33 8822.33 · 12938.19 8881.19 8821.19 12969.75 8880.15 8820.15 13001.79 8879.47 8819.47 13032.82 8879.14 8819.14 92 18 92 5 91 41 90 42 90 31 S 87.48 E 3.93 1009.98S 8099 S 86.79 E 2.44 1011.47S 8129 S 87.88 E 3.67 1012.93S 8160 S 87.89 E 3.09 1014.12S 8192 S 87.92 E .62 1015.25S 8223 .52E .13E .64E .65E .66E 8124.84 8154.48 8186.01 8218.04 8249.07 13062.25 8879.17 8819.17 89 20 13093.33 8879.53 8819.53 89 19 13128.12 8879.95 8819.95 89 19 13158.90 8880.25 8820.25 89 32 13189.79 8880.41 8820.41 89 52 S 88.70 E 4.78 1016.12S 8253. N 89.46 E 5.92 1016.32S 8284. N 90.00 E 1.55 1016.169 8318. S 88.69 E 4.32 1016.51S 8349. S 86.32 E 7.75 1017.86S 8380. 07E 14E 93E 71E 56E 8278.50 8309.57 8344.33 8375.11 8405.99 St .~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/4-29A 500292145301 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 7/96 DATE OF SURVEY: 121995 MWD SURVEY JOB NUMBER: AK-MW-50120 KELLY BUSHING ELEV. = 60.00 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 13221.12 8880.76 8820.76 88 51 S 86.18 E 3.25 1019.90S 8411.82E 13253.03 8881.41 8821.41 88 48 S 86.39 E .68 1021.97S 8443.66E 13284.07 8882.09 8822.09 88 41 S 87.37 E 3.17 1023.66S 8474.64E 13315.46 8882.63 8822.63 89 19 S 85.33 E 6.79 1025.66S 8505.96E 13346.15 8882.97 8822.97 89 25 S 85.31 E .33 1028.16S 8536.54E 8437.29 8469.17 8500.19 8531.55 8562.20 13376.97 8883.28 8823.28 89 26 S 85.65 E 1.10 1030.59S 8567.26E 13408.46 8883.60 8823.60 89 22 S 85.53 E .43 1033.01S 8598.66E 13439.83 8884.10 8824.10 88 47 S 85.85 E 2.14 1035.37S 8629.94E 13471.30 8884.74 8824.74 88 52 S 85.28 E 1.83 1037.80S 8661.30E 13502.67 8885.35 8825.35 88 52 S 85.13 E .48 1040.42S 8692.56E 8592.97 8624.43 8655.76 8687.18 8718.50 13542.19 8886.26 8826.26 88 30 S 81.30 E 9.74 1045.09S 8731.79E 13581.81 8886.67 8826.67 90 18 S 85.60 E 11.76 1049.61S 8771.13E 13612.26 8885.35 8825.35 94 39 N 83.30 E 39.12 1049.00S 8801.49E 13643.80 8883.04 8823.04 93 41 N 71.10 E 38.70 1042.05S 8832.11E 13674.83 8881.39 8821.39 92 22 N 58.80 E 39.81 1028.95S 8860.13E 8757.84 8797.30 8827.63 8858.04 8885.67 13706.37 8880.01 8820.01 92 38 N 47.00 E 37.39 1009.98S 8885.21E 13737.98 8878.56 8818.56 92 35 N 35.80 E 35.39 986.33S 8906.06E 13770.34 8877.71 8817.71 90 25 N 31.10 E 15.99 959.35S 8923.89E 13800.70 8877.35 8817.35 90 54 N 32.30 E 4.24 933.52S 8939.84E 13870.00 8876.26 8816.26 90 54 N 32.30 E .03 874.95S 8976.86E 8910.21 8930.39 8947.44 8962.66 8998.01 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 9019.40 FEET AT SOUTH 84 DEG. 25 MIN. EAST AT MD = 13870 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 91.62 DEG. TIE IN POINT 10179' WINDOW POINT 10200' INTERPOLATED DEPTH 13870' .~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/4-29A 500292145301 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 7/96 DATE OF SURVEY: 121995 JOB NUMBER: AK-MW-50120 KELLY BUSHING ELEV. = 60.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 10179.00 7242.00 7182.00 808.79 S 6105.01 E 11179.00 7968.00 7908.00 862.25 S 6787.58 E 12179.00 8742.75 8682.75 949.07 S 7411.39 E 13179.00 8880.39 8820.39 1017.16 S 8369.79 E 13870.00 8876.26 8816.26 874.95 S 8976.86 E 2937.00 3211.00 274.00 3436.25 225.25 4298.61 862.37 4993.74 695.13 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. RY-S.UN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/4-29A 500292145301 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 7/96 DATE OF SURVEY: 121995 JOB NUMBER: AK-MW-50120 KELLY BUSHING ELEV. = 60.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 10179.00 7242.00 7182.00 808.79 S 6105.01 E 2937.00 10209.64 7260.00 7200.00 810.76 S 6129.72 E 2949.64 12.64 10362.58 7360.00 7300.00 820.84 S 6244.93 E 3002.58 52.94 10502.40 7460.00 7400.00 830.07 S 6342.16 E 3042.40 39.82 10639.41 7560.00 7500.00 836.25 S 6435.60 E 3079.41 37.00 10774.49 7660.00 7600.00 841.71 S 6526.24 E 3114.49 35.08 10907.40 7760.00 7700.00 847.75 S 6613.58 E 3147.40 32.91 11039.54 7860.00 7800.00 854.58 S 6699.68 E 3179.54 32.14 11168.73 7960.00 7900.00 861.69 S 6781.16 E 3208.73 29.19 11296.37 8060.00 8000.00 868.54 S 6860.19 E 3236.37 27.64 11420.89 8160.00 8100.00 875.26 S 6934.06 E 3260.89 24.52 11543.50 8260.00 8200.00 882.09 S 7004.67 E 3283.50 22.60 11667.72 8360.00 8300.00 891.89 S 7077.67 E 3307.72 24.22 11796.98 8460.00 8400.00 905.86 S 7158.35 E 3336.98 29.27 11930.87 8560.00 8500.00 920.96 S 7246.07 E 3370.87 33.88 12064.51 8660.00 8600.00 935.40 S 7333.54 E 3404.51 33.64 12205.90 8760.00 8700.00 952.67 S 7431.70 E 3445.90 41.39 12412.75 8860.00 8800.00 984.81 S 7608.94 E 3552.75 106.85 12439.00 8868.19 8808.19 988.84 S 7633.55 E 3570.81 18.07 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE Date: RE: 28 December 1995 Transmittal of Data ECC #: 6542.00 Sent by: HAND CARRY 0 I:t I I--I-- I I~1G S I=: I::! %.~ I r' E S February 7, 1996 AOGCC Larry Grant 3001 Porcupine Dr Anchorage, AK 99501 Dear Mr. Grant, Re: Survey Data 1-3A and 4-29A Enclosed are two hard copies of the above mentioned file(s). Well 1-3A MWD survey, tie in point 7790', window point 7805', interpolated depth 11500' Well 4-29A MWD survey, tie in point 10179', window point 10200', interpolated depth 13870'. Please call me at 563-3256 if you have any questions or concerns. Regards, sand~~u~in Dept. Specialist Attachments. FEB 0 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO' David Johnst_~, DATE: ChairmaCF~ December 12, 1995 THRU: FILE NO: Blair Wondzell, .~'~ P. I. Supervisor FROM' Lou Gdmaldi, ,:.,~ SUBJECT: Petroleum Inspector AEMJLLCD.DOC BOP test Nabors rig # 2 ES Arco well # DS 4-29A Prudhoe Bay Field PTD # 95-172 Tuesday~ December 12, 1995: I witnessed the weekly BOP test on Nabors dg # 2 ES which was ddiling Arco well # DS 4-29A in the Prudhoe Bay Field. The test went very well. A Iow/high test of 250~5000 psi was put on all BOPE with the exception of the annular preventer which was tested to 250/3000 psi. A recharge test was performed that showed the accumulator was in satisfactory shape. The choke manifold was tested with all valves operating properly and holding their pressure test of 300/5000 psi. The Gas detectors showed a fault in the calibration, as the dg would not be ready to ddll out until the next morning I allowed for them to wait until the electrician came on in the morning to check them out. I instructed Robert French the detectors were to be checked and calibrated before drilling out the cement plug that had been laid in the casing. I found the condition of the dg to be in very good shape. Wednesday, December 13: I checked on the gas detectors today and found them to be calibrated and operational. Robert French informed me that the backup battery had gone bad and needed to be replaced. SUMMARY: I witnessed the weekly BOP test on Nabors dg # 2 ES ddlling Arco well # DS 4-29A. Test time 3 1/2 hours, two failures, the gas detectors. Attachments: AEMJLLCD.XLS CC: Scott Sigurdson/Randy Thomas STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: Nabors Operator: Arco Well Name: DS 4-29A Casing Size: Set @ Test: Initial Weekly Rig No. 2ES PTD# 95-172 Rep.: Rig Rep.: Location: Sec. X Other DATE: Rig Ph.# Gene Beck 12/12/95 659-4836 Robert French 35 T. 11N R. 15E Meridian Umiat Test MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location OK Standing Order Posted OK Well Sign OK Drl. Rig OK Hazard Sec. OK FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. Pressure P/F I 250/5,000 P 1 250/5,000 P 1 250/5,000 P 1 250/5,000 P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F 1 250/3,000 P 1 250/5,000 P 1 250/5,000 P 1 250/5,000 P 1 250/5,000 P 2 250/5,000 P I 250/5,000 P n/a 250/5,000 P MUD SYSTEM: Visual Alarm Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector F F H2S Gas Detector F F CHOKE MANIFOLD: No. Valves 13 No. Flanges Manual Chokes 2 Hydraulic Chokes Test Pressure P/F 250/5,000 P 36 250/5,000 P P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: Four Bottles 2100 Average 3,000 P 1,600 P minutes 25 sec. 1 minutes 41 sec. OK Remote: OK Psig. Number of Failures: 2 ,Test Time: 3.0 Hours. Number of valves tested '/9 Repair or Replacement of Failed Equipment will be made within N/A days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Good test. Gas detectors were uncalibrated. Calibrate and test before drilling out. Note: 12-13-95 called rig to check on gas detector, Robert French reported backup battery had failed and lost calibration. Battery on order and gas detectors reca/ibrated. Distribution: orig-Well File c - Oper./P, ig c - Database c - Trip Rpt File c- Insp[~l~[L (Rev. 12/94) STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: [LLCD.XLS Louis R. Grimaldi TONY KNOWLE$, GOVERNOR ALASKA OILANDGAS CONSERVATION COMMISSION November 7, 1995 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Dan Stoltz, Senior Drilling Engineer ARCO Alaska Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Dear 'Mr St°ltz: Prudhoe Bay Unit 4-29A ARCO Alaska, Inc. Permit No 95-172 Surf Loc 5018'NSL, 4777'WEL, Sec. 35, T11 N, R15E, UM Btmhole Loc 3999'NSL, 1304'WEL, Sec. 36, T11N, R15E,UM · :. Enclosed is the approved application for permit to re-ddll the above referenced well. The permit to re-drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting re-drilling operations until ali other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed pdor to ddlling a new hole. Notice may be given by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607. Chairman ~ BY ORDER OF THE COMMISSION dlf/encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.0O5 .'ype of work Drill [] Redrill CIIlb. Type of well. ExploratoryF-I Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenElI Service [] Development Gas [] Single Zone [] Multiple Zone [] Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. Plan RTE= 60.1 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612, Anchoraqe, Alaska 99519-6612 ADL 028324 4. Location of well at sur}ace 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 5018' NSL, 4777' WEL, SEC. 35, T11N, R15E Prudhoe Bay Unit At top of productive interval 8. Well number Number 4028' NSL, 2304' WEL, SEC. 36, T11N, R15E 4-29A U-630610 At total depth 9. Approximate spud date Amount 3999' NSL, 1304' WEL, SEC. 36, T11N, R15E 11/10/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and'rVD) property line ADL 028343 1304 feet No Close Approach feet 2560 13563'MD/8795' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 10195 feet Maximum hole angle91.89 o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Speci.fications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 29# L-80 NSCC 1750' 10150' 7165' 11900' 8470' 260 sx Arctic Set (Approx.) 29# 13 Cr NSCC 663' 11900' 8470' 12563' 8828' 250 sx Class 'G' 6" 4-1/2" 12.6# 13 Cr NSCT 1330' 9700' 8599' ' ~3563' 8795' 170 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) .. true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural , Conductor [' - t'i i~ Surface i'- ~. ~ ~. ~ ', -- Intermediate Production 0 C T :~ 0 'i~"'¢'"'~ ~1~ Liner Perforation depth: measured A~as,k~ Oil & 6as Cor~s. (;orr:mission true vertical Anc~orago 20. Attachments /F-,,iling fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid pr0z~a~ [] Time v~ de, p'~ plot [] Refraction analysis[] Seabed report• 20 AAC 25.050 requirements[] 21.1 hereby c~rtify~hat th~f~eg¢/~l, is true and correct to the best of my knowledge Signed ,~/~/~~t/r. ~.z -'-- ,:,'- Title SeniorDrillin~lEn~ineer Date/~::~',~.~' · ','- v c,,,,-- u'T~ Commission Use Only * '~ Permit Number IAPI number IApproval date ISee cover letter ~,~<"-/,~.2_, 150-O~__ ?---,2. / ¢,.5-3 "~ 11 ?/'- 7"/~,.d- Ifor other requirements Conditions of approval Samples required [] Yes [] No Mud log required []Yes ]~ No Hydrogen sulfide measures .1~ Yes [] No Directional survey required ]~ Yes [] No Required working pressure for DOPE [] 2M; 1-13M; 1~5M; []10M; I-I15M; Other: Original Signed By by order of ~// Approved by David W. Johnston Commissioner [ne commission Date///T)~/~' -- Form 10-401 Rev. 12-1-85 Submit i flicate [WellName: ]DS 4-29A Redrill Plan Summary Type of Redrill (producer or injector): I Shut In Producer Surface Location: 5018' FSL, 4777' FEL, S35, T1 IN, R15E, UM Target Location: 4028' FSL, 2304' FEL, S36, T11N, R15E, UM Bottom Hole Location: 3999' FSL, 1304' FEL, S36, T11N, R15E, UM I AFE Number: 14J0301 I ] Estimated Start Date: IM~: 113563 I I Nov 10, 95 l Rig: I Nabors 2ES I ] ]Operating days to complete: ]21 ] I TVD: I 8795ss I ~B Elv. 160.10 I I Well Design (conventional, slimhole, etc.): I Horizontal Sidetrack Objective: The objective of the proposed plan is to establish long-term, profitable, Lower Romeo production from this well. Mud Program: A 10.0 - 10.20 ppg Biozan polymer / KC1 water based mud will be used. ISpecial design considerations I none Depth Density PV YP INT 10MIN FL OIL SOLIDS (TVD) (PPG) (CP) (#/FT) GEL GEL cc/30min (%). (%) KOP' 10.0 10 15 5 10 10 0 5 to to to to to to to to to Target 10.2 18 30 15 29 5 0 8 Flow Pro will be used in horizontal section from 12563' MD - 13563' MD IH°riz. I 9.0 I lo I 50 ! 23 I 29 I 7-8 Directional: 0 I 0 I ]KOP: ] 10195' MD I Maximum Hole Angle: 91.89 degrees Target to TD Close Approach Well: none DS 4-29A Redrill Plan Summary Page 1 Casing/Tubing Program: Hole Size Csg/ Wt/Ft Grade Con Length Top Btm Tbg O.D. n MD/TVDss MD/TVDss 8.5" 7" liner 29# L-80 NSCC 1750 10150/7165 11900/8470 29# 13 Cr NSCC 663 11900/8470 12563/8828 6 4.5" liner 12.6# 13 Cr NSCT 1330 9700/8599 13563/8795 N/A 4.5" tbg 12.6# 13 Cr NSCT 11900 Surface 11900/8470 Cement Calculations: [Liner Size: 17" drilling liner [ Basis:I 50% open hole excess, 80' shoe joint, 1000' MD above the Sag River. Total Cement Volume: I 2501 sxs of Class G Blend @ 1.17 ft3/sx ( Estimated Volume ) [ Liner Size: [ 4.5" production liner [ Basis:[ 50% open hole excess, 80' shoe joint, 150' liner lap and 150' excess above liner with DP. Total Cement Volume: sxs of Class G Blend @ 1.17 ft3/sx ( Estimated Volume ) Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annq[ar preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. ~aS[~g. Hazards and Contingency Plans DS 4 is H2S Pad. The highest reading this year was 770 PPM on well DS 4-01 DS 4-29 highest reading this year was 10 PPM. Exercise all H2S precautionary measures and review Shared Services H2S policy prior to commencing operations. Contingency: Only essential personnel will be staying on the pad ( i.e. Co. Man, Tool Pusher, Elect/Mechanic, Cook ) and the workers will be staying off site and will be commuting to work. Sadlerochit pressure is @ 3300 psi at @ 8800' TVDss or EMW of 7.2 ppg DS 4-29A Redrill Plan Summary Page 2 Operations Summary: Rig-Work: 1. Move in drilling rig. 2. Pull BPV. Circulate out freeze protection cap from inner and outer annuli and recover for future use. 3. Install a TWC and test from below to 1000 psi. ND the production tree. 4. N/U BOP's. Test BOP's to 250 / 5000 psi against TWC. Test annular to 250 /2500 psi. Remove the test plug. . . Pull and lay down the 7" x 5-1/2" tubing. Inspect for NORM. ( Check the location and depth of the cut on production handover form ) NOTE: It is not clear as to what the running threads are on this hanger thus it is recommended that spear be used ) PU a 9 5/8" EZSV on 4 1/2" DP. RIH and set it @ 10395' MD which is 200' below the base of the planned section. Sting out. Displace hole to drilling fluid ( which will be used as milling fluid ) and & spot 18 ppg mud up to the base of the proposed 9-5/8" section. POOH. . P/U Section Mill on 4.1/2" DP & RIH. Cut window from 10195' to 10245'. POOH after ensuring the hole is cleaned and free of metal cuttings. , RIH open ended to 10345' MD and spot a kick-off plug from 100' below the base of the section to ~ 200' above the top of the section ( @ 9995' MD ). Pull 12 stands, shut in and perform hesitation squeeze. Attempt to achieve a 1000-2000 psi squeeze but do not displace TOC below 100' above section top. . Run in with an .8-1/2" steerable assembly (MWD - directional) and dress the cement to 5' below the section top. Circulate hole clean. Kickoff and directionally drill to the target at 12563' MD ( 8828' TVDss ). See attached directional plan #3. ( Use sample catchers - 100' from the target and while drilling 6" horizontal hole ) 10. After DP conveyed logs are ran ( logging program is triple combo, where density Icg may be run in place of acoustic Icg. This will be determined by geology ) make a conditioning trip with a 8 1/2" hole-opener for the open hole section with a 9 5/8" casing scraper spaced to clean the casing. If hole conditions allow consider omitting this step ( this is rig supervisors call ). Rabbit the drill string, i; i7. ~' :i :-~ .,, ~ ~ ~ ~ DS 4-29A Redrill Plan Summary .. ~.J ~..¢' ~ A~aska 0il .2 Gas Cons. , Anchorage Page 3 11. Run a 7" 29#, 13 Cr / NT-80, NSCC liner with 9 5/8 x 7" packer / hanger to bottom in the 8-1/2" hole and space out for about 150' of lap. The 13 Cr casing should extend from TD to 11900'. ( Packer will be set to allow for the tail pipe above the future potential zone of interest for CTU drill out ). Refer to Standard Recommended practices for liner running procedure. Reciprocate liner 20-30' during circulation and cementation. 13. Cement the liner in place with the total cement volume based upon 30% open-hole enlargement plus the 80' shoe volume, (TOC 1000 ft MD above the TSAD which in this case means about 250 sks but this number must be reconfirmed after the hole is drilled ). Set liner hanger / packer with 4200 psi. Reverse out clean. 14. Re-test BOP's as needed. (just a friendly reminder ) 15. Run in with 6'~ steerable drilling assembly (MWD - GR) on 4-1/2" x 3-1/2" drillpipe. Clean out to landing collar. Test casing to 3500 psi for 15 min. Drill out of shoe joints plus 10' new hole. Displace hole to FLO-PRO system 16. 17. Drill approximately 1000' of 6" hole horizontally to TD of @ 13563' MD. See attached directional plan. ( Utilize sample catchers ) 4- · The most likely scenario from here will be to run solid 4.5" liner. There is a very slight chance that we may run slotted liner and if that happens we will revise this procedure accordingly. 18. 19. Install a 4-1/2", 12.6#, 13 Cr, NSCT liner with 4-1/2" X 7"- 13 Cr packer / hanger to bottom in the 6" hole and space out for about 150' of lap. Reciprocate liner 20-30' during circulation and cementation. Cement the liner in place with the total cement volume of 170 sks ( based upon 30% open-hole enlargement ) plus the 80' shoe volume, 150' lap volume and 150' excess on top of the liner with drillpipe in the hole. Set liner hanger / packer with 4200 psi. Reverse out clean. 20. P/U 3 7/8" bit on 2 7/8" PAC stinger. RIH and clean out 4 1/2" liner to landing collar. Circulate hole clean. Pressure test the liner lap to 3500 psi for 30 min. Displace the hole with filtered seawater. POOH. 21. M/U 2 3/4" drill pipe conveyed perforating guns ( if not available use 2.5" guns ) with 10.5 gram charges, 4 spf, 60 / 120 phasing and RIH on 2 7/8", 3 1/2", and 4 1/2" drill string. Include tools as follows: Absolute pressure firing head Perforating guns & blanks, as per enclosed production specs. Firing Head Adapter Primary Firing Head ( Annulus Pressure) ~.~:. x/o 2-3/8 EUE to 2-7/8 PAC DP ....... ~-, 2-7/8" PAO 6.4# L-80 tubing ( approx. 12 joints ) DS 4-29A Redrill Plan Su~a~ Pa~e 4 x/o and Below Packer Safety Joint Bypass Port 7" Champ Packer ( To be set @ xxx' MD / xxx' TVD ) XO- 2-7/8" PAC X 4-1/2" IF Jars PR FAS-FIL Valve to be set at @ xxx' MD / xxx' TVD to achieve xxx psi underbalance. 4- 1/2" DP to surface Note: Once logs have been analyzed and the perforation intervals are known the packer depth, fluid height for underbalance, and clean up period will be determined. Detailed perforating procedure will be sent to the rig as soon as above values are known. Note: Refer to Standard Completion Running Procedure as well as Proposed completion diagram for more details. 22. Run the 4-1/2", 13 Cr, NSCT completion assembly spaced out to place end of tail pipe above the TSAD. ( TT to be spaced out @ 12150' MD ) Tubing detail as follows: ( Refer to Proposed Completion Diagram for more details ) · 4 1/2" WLEG . · · 4 1/2", 1 · 4 1/2", 1 · 4 1/2", 1 · 4 1/2", 1 · 4 1/2", 1 · 4 1/2" X · 4 1/2", 1 · 4 1/2", 1 · 4 1/2", · 4 1/2", · 4 1/2", GLM's · 4 1/2", 2.6#, 13 Cr, NSCT 10 ft pup joint 3 Cr, Otis "XN" Nipple (3.750" ID) 2.6#, 13 Cr, NSCT 10 ft pup joint 2.6#, 13 Or, NSCT full joint 2.6#, 13 Cr, NSCT 10 ft pup joint 7" Packer 2.6#, 13 Cr, NSCT 10 ft pup joint 2.6#, 13 Cr, NSCT tubing joint 12-.6#, 13 Cr, NSCT 10 ft pup joint 13 Cr, Otis "X" Nipple (3.813" ID) 12.6#, 13 Cr, NSCT tubing with GLM's .~,i~!~ ~,~] ,.,:,~ ~,~.:..., ~%',':,'.',. :.,~ Depths to be determined later. . 13 Cr, Tubing Retrievable SSSV @ 2,200' MD 4 1/2", 12.6#, 13 Cr, NSCT tubing to surface 4 1/2" tubing hanger 23. Space out, test the SSSV and circulate with corrosion inhibitor prior to setting packer. Drop the packer setting ball. Pressure the tubing to 4000 psi and set the packer. 24. Close the SSSV, install a TWC, and test to 1000 psi. Remove BOP's. 25. Install and test the production tree to 5000 psi. Pull the TWC valve. 26. While holding the 1500 psi on the tubing, pressure test the annulus to 3500 psi for 30 minutes. First bleed off the annulus, then the tubing to 0 psi. DS 4-29A Redrill Plan Summary Page 5 27. Open the SSSV and shear the RP on the upper GLM with 2900 psi annulus pressure. Bleed' off pressure and freeze protect with diesel to 2200' MD. 28. Set a BPV. Close the SSSV and secure the well. Release rig. 29. Complete appropriate documentation and hand-over to Production. DS 4-29A Redrill Plan Summary Page 6 Anadrill Schlumberger Alaska District 1111 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well ......... : DS 04-29A (P3) Field ........ : PRUDHOE BAY, DS04 Computation..: Minimum Curvature Units ........ : FEET Surface Lat..: 70.27080301 N Surface Long.: 148.27443652 W LOCATIONS - ALASKA Zone: 4 Legal Description X-Coord Y-Coord Surface ...... : 5018 FSL 4777 FEL S35 TllN R15E UM 713340.54 5951625.46 Tie-in/KOP...: 4207 FSL 3953 FEL S36 TllN R15E UM 719465.74 5950990.08 Target ....... : 4028 FSL 2304 FEL S36 TllN R15E UM 721120.00 5950860.00 BHL .......... : 3999 FSL 1304 FEL S36 TllN R15E UM 722120.00 5950860.00 PROPOSED WELL PROFILE Prepared ..... : 10/27/95 Vert sect az.: 91.62 KB elevation.: 60.10 ft Magnetic Dcln: +0.000 (' ~) Scale Factor.: 0.99995~,0 Convergence..: +1.62432665 ANADRILL AKA-DPC APPROVED OC, T Z 7 1905 STATION IDENTIFICATION TIE-IN SURVEY TOP OF WINDOW KOP CURVE 6/100 MEAS INCLN DIRECTION VERT-DEPTHS SECT DEPTH ANGLE AZIMUTH TVD SUB-S DIST · 10179 54.85 10195 54.71 10200 54.72 10300 48.75 10400 42.80 94.50 7242 7182 6125 94.62 7252 7191 6139 94.65 7254 7194 6143 95.48 7316 7256 6221 96.48 7386 7326 6292 COORDINATES-FROM STATE-PLANE TOOL DL/ WELLHEAD X Y FACE 100 808.79 S 6105.01 E 719465.74 5950990.08 145R <TIE 809.83 S 6118.04 E 719478.79 5950989.41 80R 1 810.16 S 6122.11 E 719482.87 5950989.19 174R 0.56 817.06 S 6200.28 E 719561.20 5950984.51 174R 6.00 824.49 S 6271.52 E 719632.62 5950979.10 173R 6.00 END 6/100 CURVE PGOC CURVE 13/100 LCU/SAD/Z2B TANGO 10443 40.25 12096 40.25 12164 40.25 12200 44.91 12206 45.62 96.97 7418 7358 6321 96.97 8680 8620 7384 96.97 8732 8672 7428 96.19 8758 8698 7452 96.08 8762 8702 7456 827.81 S 6299.68 E 719660.86 5950976.58 957.53 S 7360.25 E 720724.63 5950876.98 962.84 S 7403.58 E 720768.10 5950872.91 965.62 S 7427.80 E 720792.38 5950870.81 966.04 S 7431.71 E 720796.30 5950870.50 6.00 0.00 7L 0.00 6L 13.00 6L 13.00 ZONE 2A/ROMEO 12294 57.03 94.62 8817 8757 7525 972.38 S 7500.13 E 720864.87 5950866.10 5L 13.00 (Anadrill (c)95 0429AP3 2.5b.03 2:32 PM P) DS 04-29A (P3) 10/27/95 Pag= STATION IDENTIFICATION 12300 57.84 ZONE 1B/LOWER ROMEO 12331 61.87 12400 70.80 12500 83.76 BASE SAD/KAVIK 12515 85.70 PROPOSED WELL PROFILE MEAS INCLN DIRECTION VERT-DEPTHS SECT DEPTH ANGLE AZIMUTH TVD SUB-S DIST 94.54 8820 8760 7530 94.12 8836 8776 7557 93.30 8864 8804 7620 92.25 8886 8826 7717 92.10 8887 8827 7732 COORDINATES-FROM STATE-PLANE WELLHEAD X Y 972.81 S 7505.43 E 720870.18 5950865.83 974.83 S 7532.22 E 720897.01 5950864.56 978.90 S 7595.15 E 720960.03 5950862.28 983.59 S 7692.37 E 721057.34 5950860.35 984.16 S 7707.32 E 721072.30 5950860.20 END 13/100 CURVE TARGET TD 12563 91.89 12563 91.89 13563 91.89 91.62 8888 8828 7780 985.71 ~ 7754.99 E 721120.00 5950860.00 91.62 8888 8828 7780 985.71 S 7754.99 E 721120.00 5950860.00 91,.62 8855 8795 8780 1014.06 S 8754.64 E 722120.00 5950860.00 TOOL DL/ FACE 100 5L 13.00 5L 13.00 5L 13.00 4L 13.00 4L 13.00 13.ud 13,00 0.00 ANADRILL AKA-DPC APPROVED (Anadrill (c)95 0429AP3 2.5b.03 2:32 PM P) DRILLING '-- J~gG-~];T] ~';~h= 400 feel '-, AI"IADRILL AK,~-DPC IOep Scale.: ~ inch = 400 feet: ,--'-.,. --Apf .f c VE1).. : ~;T INITIA~. ~ _ MD MD ACTION 10200' 10443' .KOP CURVE 6~1100' DL,  FRM INC 54.72~ TO INC 40.25% FRM AZ 94.65~ TO AZ 96.97% FRM 7254' ~D TO 7418' ~D B 10443' 12164' DRILE TANGENTTO CURVE POINT ' ~- HOLD INC 40.25% ON AZ 96.97% K ~ FRM 7254' ~D TO 7418' ~D ~. ~2164' 12563' CURVE 13~/t00' TO 7" LINER PT, TARGET. B ~ ~ ~ FRM INC 40.25~ TO INC 91.89% FRM AZ 96.97~ u'~.~ .,.~ '. TO AZ 91.62% FRM 7418' ~D TO 8888' ~D (8828 SS) ~ "~ '. 12563' 13563' DRILL HORIZONTAL SECTION TO TD, 4-314" LINER P~ ~:;~ ~ ~ "' ' '- HOLD INC 91.89% ON AZ 91.62% (.~o _.~ ~ -.. . FRM 8888' ~D TO 8855' ~D (8795 SS) ~ ~ ~ ?" ~ ' ., L~ ~ ~ ....... .......... . ...... T~u3~ ?~a3 ' ~7~ ............................... :~ g~ ~$g~: '&, ................................... ~r~r r~r/~c -~ : - - - ~ ........... F - 5600 5800 6000 6200 6400 6600 6800 7000 7200 7400 7600 7800 8000 8200 8400 8600 8800 9000 9200 Section Bepan[une (Anad¢~]] (c)95 0489~P3 2.5b.03 2:33 PN P) SHAREB SERVTCES BS 04-29A (P3) VERTICAL SECTION VIEW Section at' 91.62 DS 04-29A PLaN VlE~ CLOSURE · 8813 feet at Azimuth 96.61 OECLINAT]ON.' +0.000 (E) SCALE · 1 inch = 1200 feet DRA~N · 10/27/95 SHARED SERVTCE'S i i i Markerj Identification MD N/S E/H A) TI~-IN SURVEY :1017§ 80g 6105 B) TOP OF WINDOW 10195 810 6118 C) KOP CURVE 6/100 10200 B:10 6122 D) END 6/100 CURVE :10443 828 6300 E) CURVE :13/100 12:164 963 7404 F) END 13/]00 CURVE :12563 986 7755 G) TARGET 12563 986 7755 H) TD 13563 :10:14 8755 DRILLING ANADRILL AKA-DPC ................. 2~ o _ j ~ - _ 600 0 600 1200 1BO0 2400 3000 3600 4200 ,1800 5400 6000 6600 7200 7800 8400 9000 9600 :10200 <- WEST · EAST -> (Anadri]] (c)95 0429AP3 2.5b.03 2:34 PM P) DS 04-29A (P3) PLAN V CLOSURE ' 8813 feet at Azimuth 96.6! SHARED SERVTCES DRILLING )ECLINATION.' +0.000 (E) ~CALE · ~ inch = 400 feet , )RAWN · I0/27/95 _ ..... ~NADRII.L AK ~,-DPC 4arker Identification MD N/S E/W ...... ~) TIE-IN SURVEY 10179 809 6105 ~] TOP OF NINDOW ~0~95 8~0 ',) K0P CURVE 6/100 10200 810 6122 }' END 6/'00 CURVE '0443 828 6300 ~, -- TARGET 12563 986 7755 [Nlli ,:. ~ ,. t1 TD 13563 ~014 8755 - , 5600 5800 6000 6200 6400 6600 6800 7000 7200 7400 7600 7800 8000 8200 8400 8600 8800 9000 9200 EAST -> 1000 2OO 1400 1800 (Anadr~]] (c)95 0~89AP3 2.5b.03 2:34 PM P) SHARED -. SERVICES DRi-LTNG .KB> -- LJO Uz-t-r'~/q Lr",.3) VERTICAL SECTION VIEW ! AN,~DRILL AKA-)PC Section at: 9J.62 TVB Scale.' J inch = J500 feet __.,,.__. ,.~ . i DPawn · J0/27/95 \ Narker Identification ND BKB SECTN INCLN %,,J A) TIE-IN SURVEY 10179 7242 6125 54.85 ' B) TOP OF WINDOW 10195 7252 6~39 54.71 -. C) KOP CURVE 6/~00 ~0200 7254 6~43 54.72 -- ", D) END 6/100 CURVE 10443 7418 632~ 40.25 '% E) CURVE ~3/~00 ]2164 8732 7428 40.25 %% '-.. F) END 13/100 CURVE 12563 8888 7780 91.89 '% 6) TARGET 12563 8888 7780 9~.89 '% H) TD ~3563 8855 8780 9~.89 · % %% %% '% · ~i ~ ' ~ .......... ~ ~::::~:~::: F 0 750 ~500 2250 3000 3750 4500 5250 6000 6750 7500 8250 9000 9750 Section Departure (Anadri]] (c)95 0429AP3 2.5b.03 2:32 PM P) WELL PERMIT CHECKLIST COMPANY INIT CLASS UNIT# PROGRAM: exp [] dev [] redrll~ serv [] ADMINISTRATION 5. 10. 11. 12. 13. Permit fee attached .................. · N Lease number appropriate ............... N Unique well name and number .............. N Well located in a defined pool ............. N Well located proper distance from drlg unit boundary.. N Well located proper distance from other wells ...... N Sufficient acreage available in drilling unit ...... N If deviated, is wellbore plat included ......... N Operator only affected party .............. N Operator has appropriate bond in force ......... I N Permit can be issued without conservation order ..... ! N Permit can be issued without administrative approval.. N Can permit be approved before 15-day wait ........ N ENGINEERING APPR D ~E ! GEOLOGY APPR D~%_72 / 14. Conductor string provided ................ Y 15. Surface casing protects all known USDWs'. ........ Y 16. CMT vol adequate to circulate on conductor & surf csg.. Y 17. CM~ vol adequate to tie-in long string to surf csg . . . Y N 18. CM~will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndmnnt been approved..Y N 22. Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate .Y~ N 25. BOPEs adequate ..................... ~ N 26. BOPE press rating adequate; test to ~O 27. Choke manifold complies w/API RP-53 (May 84) ....... 28. Work will occur without operation shutdown ....... 29. 'Is presence of H2S gas probable ............ Y~ N 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones ..... Y 32. Seismic analysis 9f shallow gas zones ........../Y 33. Seabed condition survey (if off-shore) ........ / N 34. Conuact name/phone for weekly progress reports .... ~Y [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: Z HOW~o - A:~ORMS~chekiist rev ~ Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX,' No special'effort has been made to chronologically organize this category of information. · Tape' Subfile 2 is type: TAPE HEADER PRUDHOE BAY UNIT MWs/MAD OGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: tiS'-l'7 7_--. D.S. 4-29A 500292145301 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 30-SEP-96 MWD RUN 1 AK-MM- 951265 R. FRENCH G. BECK MWD RUN 2 W. ALLEN G. BECK MWD RUN 3 R. FRENCH G. BECK MWD RUN 4 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: S. BURKHARDT G. BECK MWD RUN 5 W. ALLEN G. BECK MWD RUN 6 S. BURKHARDT G. BECK 35 lin 15E 5018 4777 57.80 56.40 27.40 RECEIVED OCT 0 3 1996 Alaska Oil & Gas Cons. Commtse OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 7.000 12628.0 6.000 13870.0 MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL 4-29A IS REPRESENTED BY RUNS 1-6. RUNS 1-3 AND 5-6 ARE DIRECTIONAL WITH GAMMA RAY (SGRD). RUN 4 IS DIRECTIONAL WITH GAMMA RAY (SGRC) AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). GAMMA RAY DATA FROM 10100' TO 12570' AND FROM 13522' TO 13820' ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTOR, AND IS NOTED AS NGP/SGRD TYPE DATA. GAMMA RAY DATA FROM 12570' TO 13522' ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER TYPE DETECTORS, AND IS NOTED A~g DGR/SGRC TYPE DATA. A MEASUREMENT AFTER DRILLING (MAD) PASS WAS PERFORMED AFTER MWD RUN 4, OVER DEPTH INTERVAL 12628' TO 13528', USING GAMMA RAY (SGRC) AND ELECTROMAGNETIC WAVE 4-r ..... SE RESISTIVITY (EWR4) SEN WELL 4-29A ~S DRILLED TO TD AT 13870'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 10101.0 RP 12597.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) all bit runs merged. BASELINE DEPTH GR 10100.0 10100.0 11860.0 11860.0 11862.5 11863.0 11886.0 11885.5 11897.0 11898.0 11908.5 11908.0 11931.5 11932.5 11944.5 11945.0 11973.5 11975.5 11991.0 11993.5 12001.0 12001.5 12016.5 12017.5 12021.5 12021.5 12031.0 12031 . 5 12047.0 12047.5 12055.5 12056.0 12073.5 12074.0 12084.5 12088.5 12095.5 12100.5 12112.5 12117.5 12123.0 12128.5 12136.0 12141.5 12141.5 12146.0 12150.0 12156.5 12183.0 12186.0 12203.0 12206.5 12214.5 12220.5 12229.5 12230.0 12269.0 12275.0 12279.0 12283.5 12308.0 12313.5 12319.5 12322.0 12328.5 12331.5 12345.0 12348.0 12350.5 12353.5 12389.5 12391.0 12417.0 12416.0 12470.5 12469.5 12476.5 12476.0 12528.5 12532.0 13866.5 13870.0 $ STOP DEPTH 13817.0 13526.0 (WALS, Open Hole, 09-DEC-95.) EQUIVALENT IINSHIFTED DEPTH 'MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: BIk~ RUN NO MERGE TOP MERGE BASE 1 10179.0 12137.0 2 12137.0 12349.0 3 12349.0 12631.0 4 12631.0 13564.0 5 13564.0 13749.0 6 13749.0 13870.0 MERGED MAIN PASS. CN WN FN COUN STAT /? ?SHIFT. OUT $ : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OFIMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 244 Tape File Start Depth = 13870.000000 Tape File End Depth = 10100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 60329 datums Tape"Subfile: 2 386 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: ..£S FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: CN WN FN COUN STAT START DEPTH 12565.0 12621.0 STOP DEPTH 13518.0 13525.0 MAD RUN NO. MAD PASS NO. MERGE TOP 4 1 12565.0 MERGE BASE 13518.0 MERGED MAD PASS. $ : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 4 2 RPX MAD 68 1 OHMM 4 3 RPS MAD 68 1 OHMM 4 4 RPM MAD 68 1 OHMM 4 5 RPD MAD 68 1 OHMM 4 6 FET MAD 68 1 HR 4 7 ROP MAD 68 1 FPHR 4 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 66 Tape File Start Depth = 13575.000000 Tape File End Depth = 12560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16249 datums Tape Subfile: 3 90 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 4 is type: FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10101.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12059.0 06-DEC-95 MSC 1.32 DEP 2.041 MEMORY 12137.0 10179.0 12137.0 0 35.3 52.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 136 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 8.500 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MI/D AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL POLYMER 9.80 55.0 9.6 31000 5.1 .000 .000 .000 .000 .0 145.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 1. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 49 Tape File Start Depth = 12140.000000 Tape File End Depth = 10100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 72573 datums Tape Subfile: 4 112 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: ~S FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12051.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12290.0 07-DEC-95 MSC 1.32 DEP 2.041 MEMORY 12349.0 12137.0 12349.0 0 42.6 59.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 193 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 8.5O0 .0 BOREHOLE CONDITIONS MI/D TYPE: MUD DENSITY (LB/G): MI/D VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRC~TING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL POLYMER 9.90 57.0 9.4 31000 4.8 .000 .000 .000 .000 .0 132.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 2. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 12355.000000 Tape File End Depth = 12045.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18113 datums Tape Subfile: 5 71 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: ~S FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12289.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12570.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 3. 09-DEC-95 MSC 1.32 DEP 2.041 MEMORY 12631.0 12349.0 12631.0 0 64.2 91.9 TOOL NUMBER NGP 136 8.500 .0 KCL POLYMER 9.90 65.0 10.0 31000 4.8 .000 .000 .000 .000 .0 132.0 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 12635.000000 Tape File End Depth = 12285.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 74677 datums Tape Subfile: 6 72 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: ~S FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12487.0 EWR4 12493.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13523.0 13530.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 16-DEC-95 MSC 1.32 DEP 2.041 MEMORY 13564.0 12631.0 13564.0 0 88.7 93.9 TOOL NUMBER P0388SP4 P0388SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 12628.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.90 57.0 9.8 44000 6.5 .100 .000 .100 .140 80.0 169.0 66.0 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size. Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 71 Tape File Start Depth = 13570.000000 Tape File End Depth = 12480.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 35562 datums Tape Subfile: 7 136 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 8 is type: ,,iS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and lo9 header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13524.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13701.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 17-DEC-95 MSC 1.32 DEP 2. 041 MEMORY 13749.0 13564.0 13749.0 0 88.5 94.7 TOOL NUMBER NGP 243 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 12628.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY '(S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 9.10 59.0 9.5 44000 4.8 .000 .000 .000 .000 .0 129.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STAI~DOFF (IN) : EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 5. CN WN FN COUN STAT ARCO ALASKA, INC. D.S. 4-29A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: .6 Tape File Start Depth = 13755.000000 Tape File End Depth = 13520.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary': Rep Code: 68 76091 datums Tape Subfile: 8 69 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type: FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE StRMMARY VENDOR TOOL CODE START DEPTH GR 13696.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIM UMANGLE: MAXIMUM ANGLE: STOP DEPTH 13820.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MI/D AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 6. 18-DEC-95 MSC 1.32 DEP 2.041 MEMORY 13870.0 13749.0 13870.0 0 90.4 92.5 TOOL NUMBER NGP 243 6.000 12628.0 FLO-PRO 9.10 51.0 9.6 39000 6.2 .000 .000 .000 .000 .0 154.0 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code samPles Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 13870.000000 Tape File End Depth = 13690.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 36646 datums Tape Subfile: 9 68 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 10 is type: ~IS FILE HEADER FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 4 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12568.0 EWR4 12625.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13522.0 13529.0 16-DEC-95 MSC 1.32 DEP 2.041 MEMORY 13564.0 12568.0 13562.0 0 88.7 93.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0388SP4 P0388SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 12628.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 8.90 57.0 · 9.8 44000 6.5 .100 .000 .100 .140 80.0 169.0 66.0 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: MOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : .0 EWR FREQUENCY (HZ) : REMARKS: MAD PASS, LOGGED AFTER MWD RUN 4. $ CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 4-29A : PRUDHOE BAY : NORTH SLOPE : ALASKA 0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MAD 68 1 AAPI 4 2 RPX MAD 68 1 OHMM 4 3 RPS MAD 68 1 OHMM 4 4 RPM MAD 68 1 OHMM 4 5 RPD MAD 68 1 OHMM 4 6 FET MAD 68 1 HR 4 7 ROP MAD 68 1 FPHR 4 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 4 95 995 99 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 66 Tape File Start Depth = 13570.000000 Tape File End Depth = 12560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 92260 datums Tape Subfile: 10 132 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 11 is type: LIS 96/ 9/27 01 **** REEL TRAILER **** 96/ 9/27 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 27 SEP 96 4:17p Elapsed execution time = 3.07 seconds. SYSTEM RETURN CODE = 0 ARCO ALASKA INC D.S. 4- 29A q ~ PRUDHOE BAY7 JAN 0 Run 1' 09 - December - 1995 DLL/ZDL/CN/GR Pipe Conveyed 1856 12608 WESTERN ATLAS Logging Services Tape Subfi'le 2'is type"~',IS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RUN 1 6542.00 K. RICHARDS SEE REMARKS D.S. 4 - 29A 500292145301 ARCO ALASKA INC. WESTERN ATLAS LOGGING SERVICES 26-DEC-95 OPEN HOLE RUN 2 RUN 3 35 llN 15E 5018 '4777 57.80 0.00 27.40 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 10174.0 8.500 12630.0 DLL/ZDL/CN/GR. CIRCULATION STOPPED AT 2200, 08-DEC-95. LOGS WITNESSED BY: D. STEARNS & S. RANDAL. PIPE CONVEYED LOGGING OPERATION. DENSITY DATA MAY BE QUESTIONABLE. THE DENSITY PAD APPEARS TO BE POSITIONED ON THE HIGH SIDE OF THE HOLE. THE CALIPER CURVE READS SMALL, THE CORRECTION IS READING HIGH AND THE RELATIVE BEARING IS READING CLOSE TO ZERO. PAD DOWN SHOULD READ 180 DEGREES. WORKED TOOL IN HOLE WITH CALIPER OPEN AND SHUT ATTEMPTING TO TURN THE TOOL. PULLED TOOL UP TO LESS DEVIATION AND WORKED TOOL AGAIN. CONSULTED WITH COMPANY REPRESENTATIVES AND DECIDED TO LOG THE WELL. CALIPER VERIFIED IN 9 5/8" CASING BEFORE AND AFTER LOGGING. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER COB .~TED, CHISM FILTER£NG IS ACTIVE, CASING CORRECTIONS OFF, SALINITY = 0.00 PPM. UPPER CASING PASS IS PRESENTED IN RAW DATA FILES ONLY (NOT IN EDITED FILE) SINCE NOT DEPTH REFERENCED TO MWD LOGS AS THE REST OF THE DATA IS. , FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY depth shifted and clipped curves; .5000 PBU TOOL CODE DLL SDN 2435 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 11856.0 12551.0 11912.0 12608.0 11880.0 12576.0 11917.0 12554.0 BASELINE DEPTH LLD 11899.0 11906.0 11923.5 11931.5 11932.0 11941.5 11955.5 11971.5 11974.5 11980.0 11991.0 11991.5 11992.0 11994.0 11996.0 11996.5 12005.0 12017.0 12017.0 12024.0 12034.0 12034.0 12034.5 12037.5 12037.0 12040.0 12040.0 12045.5 12076.0 12085.5 12096.5 12110.0 12110.0 12110.5 12123.0 12123.0 12138.5 12150.0 12150.5 12151.0 12153.5 12183.0 12185.0 12203.5 12209.5 12211.5 12211.5 12214.5 12219.5 12227.5 12229.5 EQUIVALENT UNSHIFTED DEPTH RHOB 11898.5 11906.0 11923.5 11931.0 11955.5 11971.5 11975.0 11980.0 11991.5 NPHI 11923.0 11931.0 11940.5 11955.5 11971.5 11980.0 11991.5 11994.0 11994.0 11996.5 12005.0 12005.0 12023.5 12023.5 12034.5 12034.5 12037.5 12037.5 12040.5 12040.5 12045.5 12045.5 12076.0 12076.0 12085.0' 12085.0 12097.0 12097.0 12110.0 12110.5 12123.0 12123.0 12139.0 12150.5 12183.0 12185.5 12204.0 12209.5 12214.5 12151.5 12154.5 12183.0 12185.5 12204.0 12209.5 12211.0 12219.0 12227.0 12229.5 all runs merged; no case 12237.0 12266.0 12270.5 12271.0 12279.0 12287.0 12299.5 12303.0 12308.0 12314.5 12316.5 12319.5 12320.0 12326.5 12333.0 12342.5 12347.5 12348.5 12352.5 12374.5 12390.5 12415.0 12470.5 12473.5 12476.5 12500.5 12513.0 12534.5 $ MERGED DATA SOURCE PBU TOOL CODE GR DLL SDN 2435 $ REMARKS: 1.~ 7.5 12316.5 12320.5 12326.5 12333.0 12347.0 12500.5 12266.5 12271.5 12278.5 12286.5 12300.5 12315.0 12317.0 12266.5 12270.0 12278.5 12286.5 12300.0 12303.0 12308.0 12314.5 12316.5 12319.0 12332.5 12333.0 12341.5 12341.5 12348.0 12353.0 12348.0 12374.5 12391.0 12391.0 12416.0 12416.0 12470.5 12470.5 12474.0 12477.0 12477.0 12513.0 12513.0 12534.5 RUN NO. PASS NO. MERGE TOP I 4 11856.0 1 4 11912.0 i 4 11880.0 1 4 11917.0 MERGE BASE 12551.0 12608.0 12576.0 12554.0 MAIN PASS. LL3, SP, MTEM, TEND, & TENS WERE SHIFTED WITH LLD. DRHO, PEF, CALl, & RB1 WERE SHIFTED WITH RHOB. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH1. OUT / ? ?MATCH2. OUT / ? ?MATCH3. OUT $ : ARCO ALASKA INC. : D.S. 4 - 29A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units i GR DLL 68 i GAPI 2 LL3 DLL 68. 1 OHMM 3 LLD DLL 68 i OHMM 4 SP DLL 68 i MV 5 MTEM DLL 68 I DEGF 6 TEND DLL 68 i LB 7 TENS DLL 68 I LB 8 RHOB SDN 68 i G/C3 9 DRHO SDN 68 I G/C3 10 PEF SDN 68 i BN/E 11 CALl SDN 68 i IN 12 RB1 SDN 68 i DEG 13 NPHI 2435 68 i PU-S 14 FUCT 2435 68 i CPS 15 NUCT 2435 68 I CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 17 310 01 1 4 4 17 995 99 1 4 4 17 995 99 1 4 4 17 995 99 1 4 4 17 995 99 1 4 4 17 995 99 1 4 4 17 995 99 1 4 4 49 995 99 1 4 4 49 995 99 1 4 4 49 995 99 1 4 4 49 995 99 1 4 4 49 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 60 * DATA RECORD (TYPE# 0) Total Data Records: 105 966 BYTES * Tape File Start Depth = 12617.000000 Tape File End Depth = 11833.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 25105 datums Tape Subfile: 2 286 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 3 is type: ,,IS FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String $1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 .2500 VENDOR TOOL CODE START DEPTH GR 11855.0 DLL 11912.0 ZDL 11880.0 2435 11861.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV CHT ISO ISO MODL GR CN ZDL KNJT TEMP PCM RB KNJT MIS DLL FTS $ SWIVEL SUB CABLEHEAD TENSION BRIDAL ISOLATOR BRIDAL ISOLATOR MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR RB-SUB KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB STOP DEPTH 12552.5 12609.5 12576.5 12558.5 09-DEC-95 FSYS REV. J001 VER. 1.1 2200 09-DEC-95 1747 09-DEC-95 12630.0 12620.0 11920.0 12610.0 1500.0 TOOL NUMBER 3944XA 3974XA 3997XA 3997XA 3517XA 1309XA 2435XA 2222EA/2222MA 3921XA 2806XA 3506XA 3975XA 3921XA 3967XA 1229EA/1229MA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 8.500 10174.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G;. MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 4 - 29A : PRUDHOE BAY : NORTH SLOPE : ALASKA KC POLYMER 9.~0 60.0 10.0 4.8 166.0 .188 .860 .135 .000 .214 .000 72.0 166.0 66.0 .0 66.0 .0 THERMAL SANDSTONE .00 .000 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 GR DLL 68 1 GAPI RS DLL 68 1 OHMM RD DLL 68 1 OHMM SP DLL 68 1 MV TEMP DLL 68 1 DEGF CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 1 F/MN ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN RB ZDL 68 1 DEG SHR ZDL 68 1 CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L 4 4 17 310 01 1 4 4 17 220 09 1 4 4 17 220 10 1 4 4 17 010 01 1 4 4 17 660 99 1 4 4 17 635 99 1 4 4 17 635 99 1 4 4 17 636 99 1 4 4 46 350 01 1 4 4 46 356 99 1 4 4 46 358 01 1 4 4 46 280 99 1 4 4 46 631 01 1 4 4 46 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 890 01 1 18 LSN 2435 6f i CPS 19 SSN 2435 68 I CPS * DATA RECORD (TYPE# 0) Total Data Records: 262 43 334 m 43 334 mmmmmmm 76 966 BYTES * 31 3O Tape File Start Depth = 12617.~00000 Tape File End Depth = 11833.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 3 62741 datums 348 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 4 is type. LIS RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 3 - .2500 VENDOR TOOL CODE START DEPTH GR 12136.0 DLL 12193.0 ZDL 12162.0 2435 12142.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB CHT CABLEHEAD TENSION ISO BRIDAL ISOLATOR ISO BRIDAL ISOLATOR MODL MODAL SUB GR GAMMA RAY CN COMPENSATED NEUTRON ZDL Z-DENSITY KNJT KNUCKLE JOINT TEMP TEMPERATURE PCM PULSE CODE MODULATOR RB RB-SUB KNJT KNUCKLE JOINT MIS MASS ISOLATION SUB DLL DUAL LATEROLOG FTS FEED THROUGH SUB $ STOP DEPTH 12550.0 12606.5 12573.5 12556.0 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): 09-DEC-95 FSYS REV. J001 VER. 1.1 2200 09-DEC-95 1625 09-DEC-95 12630.0 12620.0 11920.0 12610.0 1500.0 TOOL NUMBER 3944XA 3974XA 3997XA 3997XA 3517XA 1309XA 2435XA 2222EA/2222MA 3921XA 2806XA 3506XA 3975XA 3921XA 3967XA 1229EA/1229MA 8.500 10174.0 .0 KCL POLYMER 9.80 MUD VISCOSITY (S MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 4 - 29A : PRUDHOE BAY : NORTH SLOPE : ALASKA __ .0 10.0 4.8 166.0 · 188 .860 · 135 .000 .214 .000 THERMAL SANDSTONE .00 .000 .0 72.0 166.0 66.0 .0 66.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 GR DLL 68 i GAPI RS DLL 68 1 OH~M RD DLL 68 1 OHMM SP DLL 68 1 MV TEMP DLL 68 1 DEGF CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 i F/MN ZDEN ZDL 68 i G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN RB ZDL ~68 1 DEG SHR ZDL 68 1 CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS 4 4 17 310 01 1 4 4 17 220 09 1 4 4 17 220 10 1 4 4 17 010 01 1 4 4 17 660 99 1 4 4 17 635 99 1 4 4 17 635 99 1 4 4 17 636 99 1 4 4 46 350 01 4 4 46 356 99 1 4 4 46 358 01 1 4 4 46 280 99 1 4 4 46 631 01 1 4 4 46 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 890 01 1 4 4 43 334 31 1 4 4 43 334 30 1 mmmm! * DATA RECORD (TYPE# 0) Total Data Records: 169 966 BYTES * Tape File Start Depth = 12614.000000 Tape File End Depth = 12110.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 65446 datums Tape Subfile: 4 253 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 5 is type: ~IS RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 1 .2500 VENDOR TOOL CODE START DEPTH GR 10051.0 DLL 10107.5 ZDL 10076.0 2435 10080.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 10271.0 10328.0 10295.5 10247.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV CHT ISO ISO MODL GR CN ZDL KNJT TEMP PCM RB KNJT MIS DLL FTS $ SWIVEL SUB CABLEHEAD TENSION BRIDAL ISOLATOR BRIDAL ISOLATOR MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR RB-SUB KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): 09-DEC-95 FSYS REV. J001 VER. 1.1 2200 09-DEC-95 1410 09-DEC-95 12630.0 12620.0 11920.0 12610.0 1500.0 TOOL NUMBER 3944XA 3974XA 3997XA 3997XA 3517XA 1309XA 2435XA 2222EA/2222MA 3921XA 2806XA 3506XA 3975XA 3921XA 3967XA 1229EA/1229MA 8.500 10174.0 .0 KCL POLYMER 9.80 MUD VISCOSITY MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: UPPER CASING SHOE PASS. NOT DEPTH REFERENCED TO MWD LOGS. $ CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 4 - 29A : PRUDHOE BAY : NORTH SLOPE : ALASKA 0 10.0 4.8 166.0 · 188 .860 .135 .000 .214 .000 THERMAL SANDSTONE .00 .000 .0 72.0 166.0 66.0 .0 66.0 .0 * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool code samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 17 18 GR DLL 68 1 GAPI RS DLL 68 1 OHMM RD DLL 68 1 OHMM SP DLL 68 1 MV TEMP DLL 68 1 DEGF CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 1 F/MN ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN RB ZDL 68 1 DEG SHR ZDL 68 1 CNC 2435 68 1 PU-S CNCF 2435 -68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS 4 4 17 310 01 1 4 4 17 220 09 1 4 4 17 220 10 1 4 4 17 010 01 1 4 4 17 660 99 1 4 4 17 635 99 1 4 4 17 635 99 1 4 4 17 636 99 1 4 4 46 350 01 1 4 4 46 356 99 1 4 4 46 358 01 1 4 4 46 280 99 1 4 4 46 631 01 1 4 4 46 995 99 1 4 4 43 995 99 1 4 4 43 995 99 1 4 4 43 890 01 1 4 4 43 334 31 1 19 SSN 2435 6'~' I CPS * DATA RECORD (TYPE~ 0) Total Data Records: 102 966 BYTES * 43 334 30 Tape File Start Depth = 10328.000000 Tape File End Depth = 10024.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 87082 datums Tape Subfile: 5 187 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 6 is type. LIS 95/12/26 01 **** REEL TRAILER **** 95/12/26 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 26 DEC 95 11:26a Elapsed execution time = 2.58 seconds. SYSTEM RETURN CODE = 0