Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-184 XHVZE e e Image Project Well History File Cover Page This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ Q3 - 1 <6.lf Well History File Identifier Organizing (done) D Two-sided 1111111111111111111 D Rescan Needed 1/ 111111111 II 111111 RES CAN ~L DATA OVERSIZED (Scannable) ~olor Items: Diskettes, No.' D Maps: D Greyscale Items: D Other, NolType: D Other Items Scannable by a Large Scanner D Poor Quality Originals: OVERSIZED (Non-Scannable) D Other: D Logs of various kinds: NOTES: D Other:: r11f BY: CMa~ 151 Project Proofing 1/11111111111' "III BY: ~ 151 mP Scanning Preparation + BY: Date: Production Scanning Stage 1 Page Count from Scanned File: -4+ (Count does include cover sheet) Page Count Matches Number in scanì·ng Preparation: V YES BY: ~ Date:3 /0106 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES 11/11111111I11 1111I NO 151 vvvp NO BY: Maria Date: 151 11I/1111111111 1111I Scanning is complete at this point unless rescanning is required. ReScanned III II 111111 "'"111 BY: Maria Date: 151 Comments about this file: Quality Checked 11111111111I111111I 10/6/2005 Well History File Cover Page.doc • MICROFILMED 03/01/2008 DO NOT PLACE ?: 6_.;:= ~; ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\C~rPgs_Inserts\Microfilm_Marker.doc e e WELL LOG TRANSMITTAL JÐS'~ re+-J To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 17,2006 I '3&d5 RE: MWD Formation Evaluation Logs A-38 L2, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 A-38 L2: LAS Data & Digital Log Images: 50-029-22347-61 1 CD Rom 11 ~() t h):r, .. t51~.1 '~¡~I/Jt.¡; ~ fJ.,;~.;{ ,z(H\ ~ DATA SUBMITTAL COMPLIANCE REPORT 3/2/2006 Permit to Drill 2031840 MD 13050 --_._.~ Well Name/No. PRUDHOE BAY UNIT A-38L2 Operator BP EXPLORATION (ALASKA) INC )(l <J...¿ / ¿Jt1 OJ\. À¡ ú-l API No. 50-029-22347-61-00 TVD 9043 ..- Completion Date 3/6/2004 // Completion Status 1-01L REQUIRED INFORMATION Samples No Mud Log No DATA INFORMATION Types Electric or Other Logs Run: MWD, NGP, GR, Induction Log Well Log Information: Log/ j¡fData. . Digital T Med/Frmt r 0 Aso I Electr Dataset Number Log Log Run Scale Media No Name Directional Survey ~D C Las 12476 Induction/Resistivity ED C Pdf 12476 Induction/Resistivity -tõ9 Induction/Resistivity 8M Rpt Directional Survey ~- 0 Lis pt 'µP- 0 Tap 12577 Gamma Ray LIS Verification 12577 Gamma Ray Current Status 1-01L UIC N -~ Directional Survey Yes ._-~~ (data taken from Logs Portion of Master Well Data Maint Interval OH/ Start Stop CH Received Comments 4/23/2004 An H2S Measure-ñi-entlSl required to be submitted. ! This record automatically created from Permit to Drill Module on: 10/31/2003. A Directionàl Survey Log is required to be submitted. This record automatically created from Permit to Drill Module on: 10/31/2003. 11174 12578 Open 3/22/2004 Induction Log 11174 12578 Open 3/22/2004 Induction Log 11174 12578 Open 3/22/2004 Induction Log 4/23/2004 An H2S Measurement is required to be submitted. This record automatically created from Permit to Drill Module on: 10/31/2003. 0 0 7/9/2004 0 0 6/9/2004 11600 13025 Open 6/9/2004 GR, ROP Sample Set Number Comments Well Cores/Samples Information: Name Interval Start Stop Sent Received . . DATA SUBMITTAL COMPLIANCE REPORT 3/2/2006 Permit to Drill 2031840 Well NamelNo. PRUDHOE BAY UNIT A-38L2 Operator BP EXPLORATION (ALASKA) INC MD 13050 Completion Status 1-01L Current Status 1-01L TVD 9043 Completion Date 3/6/2004 ADDITIONAL INFORMATION Well Cored? Y ® Chips Received? ~ Daily History Received? O/N f]yN Formation Tops Analysis Received? YlN API No. 50-029-22347-61-00 UIC N Comments: --~---~ -~ Date: c¡ /~'- )~h ~--- Compliance Reviewed By: . . e e .Âl.~·IÞ;·~/I'~' (25'" '! WELL LOG TRANSMlITAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska May 11, 2004 RE: MWD Formation Evaluation Logs A-38 L2, AK-MW-2947638 1 LDWG formatted Disc with verification listing. AùPI#: 50-029-22347-61 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date# 0..-.-.-- w\ · STATE OF ALASKA .. ALASKA AND GAS CONSERVATION COM~ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20MC 25.105 20MC 25.110 o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2229' NSL, 1013' WEL, SEC. 35, T11N, R13E, UM Top of Productive Horizon: 4458' SNL, 2527' WEL, SEC. 02, nON, R13E, UM Total Depth: 183' SNL, 3175' WEL, SEC. 11, T10N, R13E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 654395 y- 5947395 Zone- ASP4 TPI: x- 653025 y- 5940679 Zone- ASP4 Total Depth: x- 652398 y- 5939662 Zone- ASP4 18. Directional Survey 181 Yes 0 No 21. Logs Run: MWD, NGP, GR, Induction Log One Other 5. Date Comp., Susp., or Aband. 3/6/2004 6. Date Spudded 3/1/2004 7. Date T.D. Reached 3/5/2004 8. KB Elevation (ft): KBE = 83.80 9. Plug Back Depth (MD+ TVD) 13050 + 9043 10. Total Depth (MD+TVD) 13050 + 9043 11. Depth where SSSV set (Nipple) 2092' MD 19. Water depth, if offshore NIA MSL 22. CASING, liNER AND CEMENTING RECORD ~?ii CASING§ETTINeaPEF'TH MD SETTINGDJ!'PTH'JVp SIZE WT.PERFT.GMbe¡ Top I BOTTOM Top BOTTOM 20" 91.5# H-40 32' 112' 32' 112' 10-3/4" 45.5#' J-55 36' 3388' 36' 3053' 7-5/8" 29.6# NT95 35' 11512' 35' 8844' 5-1/2" 17# 13Cr80/L-80 11353' 11531' 8712' 8860' 3-112" x 3-3/16" 8.81#/6.2# L-80 11347' 11608' 8707' 8918' 2-3/8" 4.7# L-80 11548' 13050' 8874' 9043' 23. Perforations op'en to Production (MD + TVD of Top and 24.. Bottom Interval, Size and Number; if none, state "none"): 2-3/8" Slotted Section MD TVD 11568' - 11940' 8890' - 8992' 12094' - 12220' 9007' - 9025' 12313' - 12440' 9036' - 9038' 12471' - 12626' 9040' - 9045' 12657' - 13038' 9044' - 9042' MD 26. Date First Production: March 24, 2004 Date of Test Hours Tested PRODUCTION FOR 3/31/2004 4 TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 33~ 1,571 24-HoUR RATE ~ yo;;;'1('"'' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11608' Set Flo- Thru Whipstock 2000' Freeze Protected with 50/50 MeOH 30" 13-1/2" 9-7/8" 6-3/4" 3-3/4" 3" SIZE 4-1/2", 12.6#, 13Cr TVD 125. ACID, - PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Oll-BBl GAs-McF WATER-BBl 75 53 373 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (ap¡¡&r µ~rÊe sheeEt if necessary). Submit core chips; if none, state "none". t'(I::Lt IV D -" . 6 ',nn!.. J~ p~:l;:7;:'^~'2:'''''''''+~''' l H1\, None 1~1>""::i;;!DN , IØ)MSBFl fiR . I~ ORIGINAl Oll-BBl 450 27. Form 10-407 Revlsed12'72d03 GAs-McF 317 WATER-BBl 2,238 CONTINUED ON REVERSE SIDE 1b. Well Class: 181 Development 0 Exploratory o Stratigraphic Test 0 Service 12. Permit to Drill Number 203-184 13. API Number 50- 029-2234 7-61-00 14. Well Name and Number: PBU A-38L2 15. Field I Pool(s): Prudhoe Bay Field I Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 047472 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) 1281 cu ft Arcticset 2054 cu ft CS III, 408 cu ft Class 'G' 387 cu ft Class 'a' 140 cu ft Class 'G' N/A-(L 1 Uncemented Slotted Liner) Uncemented Slotted Liner TÛ61NGReCORD DEPTH SET (MD) 11362' ~ PACKER SET (MD) 11301 ' ETC. CHOKE SIZE I GAS-Oil RATIO 93.54° 704 Oil GRAVITY-API (CORR) 25.6 APR -1 2004 Alaska Oil & Gas Cons. Commission . -nTTIiTIV' . D' ... r~\./ .... 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sadlerochit 11661' 8947' None Sadlerochit 12155' 9016' RECEIVED APR - 1 2004 Alaska Oil & Gas Cons. Commission Anchorage 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date 04 ·0/,0 PBU A-38L2 Well Number Prepared By Name/Number: Drilling Engineer: Terrie Hubb/e, 564-4628 Dan Kara, 564-5667 203-184 Permit No. I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If 00"" "". "No",", 0 ,~ I GIN A L Form 10-407 Revised 12/2003 e e A-38L2 Prudhoe Bay Unit 50-029- 2234 7 -61-00 203-184 Accept: Spud: Release: Ri: PRE-RIG WORK 11/22/03 DRIFT W/2.78 CENT, 2.55" DUMMY GUN (12.5' LNG)& SAMPLE BAILER TO 10,700'SLM. SET WIDDON CATCHER. PULL GLV'S FROM STA #1,#4, #5. 11/23/03 PULLED GL V FROM ST A #6. SET 1" DGL V'S WI BK LATCH'S IN ST A #'S 6, 5, 4 & 1. CALIPER FROM 11628' SLM TO SURFACE. GOOD DATA. WELL LEFT SHUT-IN. (PRE CTD) 01/08/04 RUN PDS S fTI P. STOP @ 11571 X 40 MIN. STOP @ 11451 X 20 MIN. 01/09/04 CONTINUE STATIC STOPS @ 11329 (20 MIN) & 11571 (20 MIN.). LOG LDL FROM 11571' TO SURFACE WHILE PUMPING DOWN IA @ 1.5 BPM. LEAK AT GLM #1 @ 11235' MD. SET CATCHER SUB AT 11311' SLM. ATTEMPT TO PULL ST A. # 1. UNABLE TO LATCH. RUN 1.4 LIB TO ST A.1 SHOWED EMPTY POCKET. BRUSH GLM'S WI BLB, DOUBLE KNUCKLE, 2.34 GAGE RING. ATTEMPT TO SET DGLV. UNSUCCESSFUL. RIG DOWN DUE TO HIGH WINDS. C-SUB STILL IN HOLE. 01/11/04 SET 1" BK DGLV STA. 1. MITIA TO 3000 PSI, PASS. PULL CATCHER SUB. 01/12/04 DRIFT WI 8' X 2 518" STEM, 2.60 TAPERED CENTRALIZER TO 11540' SLM. DRIFT WI KJ, 2.60 BELLGUIDE, 1.25" JDC. TO 11601' SLM. DRIFT WI 13' X 2112 DUMMY GUN, STOPPED AT 11543' SLM (AT 20 DEGREE DOGLEG). DRIFT WI 8' X 2112 BAILER AND 2.5 CENT, STOPPED AT 11559' SLM. 02/23/04 DMY WHIPSTOCK DRIFT; MIRU DS CTU #5. KILL WELL WITH 250 BBLS OF FILTERED KCL. RIH WITH 2.625" X 12' DRIFT. DRIFT TO 11616' CTMD (TOP OF 2 7/8" LINER). BULLHEAD 38 BBL FLOPRO PILL INTO SLOTTED LINER. POOH MAINTAINING POSITIVE WHP. FP WELL WITH 60/40 METH TO 2500'. RD DS CTU #5. WELL TO REMAIN SHUT-IN FOR UPCOMING CTD JOB. JOB COMPLETE. legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-38 A-38 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 3S Start: 4/24/2002 Rig Release: 5/7/2002 Rig Number: N3S Spud Date: 4/30/1993 End: 5/7/2002 4124/2002 18:00 - 00:00 6.00 MOB N WAIT PROD1 Arrive to Apad. Rig on stand by at 18:00 hrs. Waiting on DSM to level the pad. 4/25/2002 00:00 - 05:30 5.50 MOB N WAIT PRE Wait on Pad to be leveled up. 05:30 - 07:45 2.25 RIGU P PRE Rig off stand-by. Spot Nabors 3S over well. 07:45 - 10:15 2.50 RIGU N HMAN PRE Not able to spot mud tanks next to rig. Angled too much to that side. Re-spot rig over well. 10:15 - 13:30 3.25 RIGU P PRE Spot mud tanks. Continue with R/U. OS CTU #4 on location at 1100 hrs and started their R/U. Notified AOGCC of pending BOP test. Witnessing wavied by John Spaulding. 13:30 - 20:00 6.50 BOPSU P DECOMP Accept rig. Start nipple up BOPE. Double valved IA 20:00 - 00:00 4.00 BOPSU P DECOMP BOPE test. 4/26/2002 00:00 - 01 :00 1.00 BOPSU P DECOMP Completed BOPE test, 01 :00 - 01 :45 0.75 BOPSU P DECOMP Pull TWC. Well has 250 psi 01 :45 - 02:15 0.50 STWHIP P WEXIT Bleed off pressure. Monitor well 02:15 - 04:15 2.00 STWHIP P WEXIT P/U injector. Install coil connector. Pull test eTC. MIU milling BHA 04:15 - 06:25 2.17 STWHIP P WEXIT RIH w/BHA #1. Tagged SWN nipple at 11350'. 06:25 - 06:50 0.42 STWHIP P WEXIT Crew change. PJSM review plans of drilling window. Discuss well bore gas problem. 06:50 - 07: 15 0.42 STWHIP P WEXIT Circulate well to tiger tank to clear up wellbore gas. 07:15 - 08:35 1.33 STWHIP P WEXIT RIH start milling nipple. Free spin 1730 psi at 2.6 bpm. Mill through nipple. Pick-up run though w/o pump. Looks good. 08:35 - 09:50 1.25 STWHIP P WEXIT RIH tag whipstock (top @ 11530'). Pinch point at 11531'. Correct coil depth -12'. FS 1700 psi @ 2.5 bpm 09:50 - 14:35 4.75 STWHIP P WEXIT Time milling window. Top of window 11531' Bottom of window 11536.8' Work window area with string mill. 14:35 - 15:30 0.92 STWHIP P WEXIT Drill formation from 11536.8' to 11548' (starting swap to Flo-Pro at 11548') 15:30 - 17:35 2.08 STWHIP P WEXIT Continue to swap hole to Flo-pro ( working window area, looks good w & wlo pump) 17:35 - 19:35 2.00 STWHIP P WEXIT TOH. Flag pipe at 11300'. 19:35 - 21 :00 1.42 STWHIP P WEXIT OOH. UD milling tools. P/U build assembly. 21 :00 - 23:00 2.00 DRILL P PROD1 RIH w/BHA #2. Corrected 12' @ EOP 23:00 - 00:00 1.00 DRILL P PROD1 Sent command to TORe. Didn't response. Struggling with TORe. Got tool faces. 4/27/2002 00:00 - 01 :00 1.00 DRILL N SFAL PROD1 Struggling getting TORC to work. Finally got it. Back on bottom. 01 :00 - 05:45 4.75 DRILL N SFAL PROD1 Problem with electronics on pump controls. Unable to establish communication with orienter. POH to 11517'. Call a technician. Pump pressure had exceeded default setting of 4k. Unknown to operator, technican, and DO all that was needed was to reset "touch" screen reset button. Pump parameters reset to 4500 psi cut-out. 05:45 - 06:15 0.50 DRILL N SFAL PROD1 Orient RIH 06:15 - 07:50 1.58 DRILL P PROD1 Directionally drill f/11548' to 11589'. FS 2.4 2770 07:50 - 08:40 0.83 DRILL N SFAL PROD1 Shutdown to check suction valve on Nabors pump. Something still wrong swap to Dowell pump. 08:40 - 09:20 0.67 DRILL N SFAL PROD1 Screw with Dowell pump and finally get it right. Orient. 09:20 - 10:45 1.42 DRILL N DFAL PROD1 Directional drill f/11589' to 11598'. Frequent stalls at 11591'. FS 2.5 2700 psi OB 2850. TF drifting f/ 60R to 90R. P/U to orient, sent command for 60R RIH waiting for TF reading. Tagged bottom and stalled motor. P/U & reduced pump rate (normal operation) brought pump backup to 2.5 bpm noticed Printed: 3/8/2004 8:42: 17 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-38 A-38 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 3S Start: 4/24/2002 Rig Release: 5/7/2002 Rig Number: N3S Spud Date: 4/30/1993 End: 5/7/2002 4/27/2002 09:20 - 10:45 1.42 DRILL N DFAL PROD1 loss of 500 psi pump pressure and no MWD signal. RIH tagged and seen slight increase in pump pressure. 10:45 - 13:20 2.58 DRILL N DFAL PROD1 TOH. Found TORO tool radially broken 26.29' below top of tool at the final drive housing. Fish in hole: bit, motor,UBHO, 3-flex collars, flow sub, XO, 1.33' of the final drive housing for total of 42.41'. Within the final drive is a 1" drive shaft lossely held in place that maylmay not still be sticking up. If so it would be +/- 8" up. Plan is to RIH with LIB to determine if this "shaft" is still in place. 13:20 - 16:00 2.67 DRILL N DFAL PROD1 Cut 300' of coil while waiting on fishing tools. This is planned operation. 16:00 - 17:00 1.00 DRILL N DFAL PROD1 Wait on slickline. 17:00 - 18:45 1.75 DRILL N DFAL PROD1 R/U slickline 18:45 - 19:00 0.25 DRILL N DFAL PROD1 PJSM 19:00 - 20:30 1.50 DRILL N DFAL PROD1 RIH w/LlB on slickline. 800#s up @ 11500'. Tag at 11532'. POH 20:30 - 21 :30 1.00 DRILL N DFAL PROD1 POH w/LlB. Looks like did not go through the window. 21:30 - 23:15 1.75 DRILL N DFAL PROD1 RIH wlLlB on slickline. wt up 800 #s. Work to pass through the window. RIH to 11553'. POH 23:15 - 00:00 0.75 DRILL N DFAL PROD1 POH. At 7000' wire broke. Pulling 800#s. No overpull. Made torsion test on the wire get a clean cut and compare with the one broke in the hole. Looks corroded. Ask for other slickline unit to fish wire. The braided line drum on current unit has a bad spot at 9000' and it's not an option. Not sure which will be the condition of the remaining drum so call for other unit. Length of the slick-line fish 32.91' of tools plus 4500' of wire. 4/28/2002 00:00 - 01 :30 1.50 DRILL N DFAL PROD1 RD slick line unit #1. 01 :30 - 02:30 1.00 DRILL N DFAL PROD1 Waiting on Slickline unit #2. 02:30 - 05:30 3.00 DRILL N DFAL PROD1 Unit on location, Rigging up. 05:30 - 08:15 2.75 DRILL N DFAL PROD1 RIH wlgrapple to catch wire. 08:15 - 09:50 1.58 DRILL N DFAL PROD1 TOH w/ wire fish to 100'. 09:50 - 10:05 0.25 DRILL N DFAL PROD1 PJSM for wire retrievel. 10:05 - 11 :20 1.25 DRILL N DFAL PROD1 TOH with fishing tools. Secure slickline. UD fishing tools. Work out enough wire and secure to reel. 11 :20 - 12:30 1.17 DRILL N DFAL PROD1 TOH with 4500' wire and LIB. 12:30 - 13:00 0.50 DRILL N DFAL PROD1 UD slickline BHA and LIB. Good impression of 1" dia driveshaft within the final drive assembly of TORO orienter. 13:00 - 15:40 2.67 DRILL N DFAL PROD1 Redress WL tools. PIU Baker overshot dressed wI 3.125" grapples and xo's to baited sub w/ GS profile and weight bars long enough to keep .125" slickline above whipstock. 15:40 - 16:40 1.00 DRILL N DFAL PROD1 RIH. Unable to work past 6430'. 16:40 - 17:40 1.00 DRILL N DFAL PROD1 TOH 17:40 - 19:00 1.33 DRILL N DFAL PROD1 Reposition slickline unit to have a better straight line shot at rig floor. Previously at a bad angle to take advantage of weight transfer with slickline. 19:00 - 21 :30 2.50 DRILL N DFAL PROD1 RIH wlBaker overshot, same BHA than previous run. RIH to 6413'. Unable to go through. Work line. No success. POH. I Stuck. Jarring three times. Pull free. Something is grabbing tools. Wire? POH 21 :30 - 22:00 0.50 DRILL N DFAL PROD1 P/U 3.8" LIB. 22:00 - 00:00 2.00 I DRILL N DFAL PROD1 RIH with 3.8" LIB. Unable to pass through 2082'. SSSV I nipple. POH to P/U 3 3/4" LIB. Printed: 3/8/2004 8:42: 17 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-38 A-38 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 3S Start: 4/24/2002 Rig Release: 5/7/2002 Rig Number: N3S Spud Date: 4/30/1993 End: 5/7/2002 4129/2002 00:00 - 02:30 2.50 DRILL N DFAL PROD1 RIH w/3.75" LIB. Pass through SSV nipple wlo problems. Tag at 6413'. POH 02:30 - 03:00 0.50 DRILL N DFAL PROD1 OOH. LIB show some wire marks on the side. Face clean. P/U grapple and brush. 03:00 - 04:30 1.50 DRILL N DFAL PROD1 RIH wlgrapple and brush. Set down at 6415'. P/U. Work line out. Unable to go back to 6415'. POH 04:30 - 04:50 0.33 DRILL N DFAL PROD1 OOH. Recovered approx 45' of wire. The end of the wire match with the one pulled out broke. Suspect no more wire in the hole. PIU Baker overshot. 04:50 - 07:15 2.42 DRILL N DFAL PROD1 RIH wlBaker overshot. Unable to work overshot beyond window area. Appears OS is wedged at that area 07:15 - 08:10 0.92 DRILL N DFAL PROD1 TOH 08:10 - 08:25 0.25 DRILL N DFAL PROD1 Redress slickline tools to GS profile 08:25 - 09:45 1:33 DRILL N DFAL PROD1 RIH tag top of baited sub. Latch in able to pull overshot easily. 09:45 - 11 :00 1.25 DRILL N DFAL PROD1 T"OH recovered overshot assembly. Marks on face of overshot guide shoe +1- 3.5" across from one another. 11 :00 - 11 :45 0.75 DRILL N DFAL PROD1 Shorten overshot extension by 2.23'. Round-over guide shoe face. 11 :45 - 13:30 1.75 DRILL N DFAL PROD1 RIH tagged same spot 11530-35' area. Did not try to get aggressive working the spangs. 13:30 - 14:45 1.25 DRILL N DFAL PROD1 TOH 14:45 - 15:05 0.33 DRILL N DFAL PROD1 UD slickline tools. PJSM discuss p/u BHA for running OS on coil. 15:05 - 18:00 2.92 DRILL N DFAL PROD1 M/U Baker CTC PT to 3500 psi and pull test to 40k. WO Baker hydraulic centrilizer. M/U fishing BHA 18:00 - 20:10 2.17 DRILL N DFAL PROD1 RIH wlBaker overshot. Include hydraulic centralizer on BHA. 20:10 - 23:15 3.08 DRILL N DFAL PROD1 RIHt011500'. up wt50k. RIHand dry tag 11527'. Unable to go through. Pump to activate Hyd centralizer. Go through easily. Tag fish at 11548' . Pull 70K. Fish engage? Jar once. Pulled 52K 23:15 - 00:00 0.75 DRILL N DFAL PROD1 OOH. Found guide shoe is gone. Left 0.45' guide shoe in the hole on top of original fish. UD BHA 4/30/2002 00:00 - 00:45 0.75 DRILL N DFAL PROD1 UD fishing BHA. 00:45 - 01 :30 0.75 DRILL N DFAL PROD1 Waiting on Baker motor for window dressing. 01 :30 - 02:00 0.50 DRILL N DFAL PROD1 MU window milling assembly. 02:00 - 05:00 3.00 DRILL N DFAL PROD1 RIH w/Baker motor. Pass through window. Saw a bubble. Tag fish at 11549'. Same depth that previous tag. Redressing window. POH 05:00 - 06:50 1.83 DRILL N DFAL PROD1 TOH 06:50 - 07:55 1.08 DRILL N DFAL PROD1 UD motor. P/U cement nozzle BHA. Stab on injector. 07:55 - 10:30 2.58 DRILL N DFAL PROD1 TIH. Tagged top of fish. Corrected depth 11554'. 10:30 - 10:45 0.25 DRILL N DFAL PROD1 PJSM review cemeting details 10:45 - 12:30 1.75 DRILL N DFAL PROD1 Batch mix 5 bbls cement. PT lines to 4k. Pump 3.5 bbls 17.0 ppg neat cement. Displace w/Nabors pump. Lay-in 1:1 from 11554' to 11400'. Pull to saftey at 11000'. 12:30 - 13:00 0.50 DRILL N DFAL PROD1 woe 13:00 - 13:30 0.50 DRILL N DFAL PROD1 RIH wash cement to 11532'. (window 11531 - 11536') 13:30 - 14:30 1.00 DRILL N DFAL PROD1 TOH 14:30 - 00:00 9.50 DRILL N WAIT PROD1 Phase 3 conditons called for all access roads and pads. RIH to 7000'. WOW 5/1/2002 00:00 - 06:00 6.00 DRILL N WAIT PROD1 Wait on weather Phase III conditions on access roads and pads. Phase II on Spine Road High winds gusts to 60 mph. 06:00 - 06:30 0.50 DRILL N WAIT PROD1 Crew change. Safety meeting review plan forward after Phase Printed: 3/8/2004 8:42:17 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-38 A-38 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 3S Start: 4/24/2002 Rig Release: 5/7/2002 Rig Number: N3S Spud Date: 4/30/1993 End: 5/7/2002 511/2002 06:00 - 06:30 0.50 DRILL N WAIT PROD1 III. 06:30 - 17:20 10.83 DRILL N WAIT PROD1 WOW. Perform routine maintenance. RIH from 7000' to 9,000' and circulate. 17:20 - 18:50 1.50 DRILL N DFAL PROD1 TOH Spine road Phase I, access roads and pads phase III. Winds 25-40 and decreasing. Further operations at the discretion of individual rig situations. High winds have been the problem. 18:50 - 19:45 0.92 DRILL P PROD1 Cut 100' off coil. 19:45 - 20:15 0.50 DRILL P PROD1 Stab on to well to circulate to warm coil. 20:15 - 21:45 1.50 DRILL N DFAL PROD1 Pu tools. Pull test coil connector. Pressure test MHA and CTC. 21 :45 - 23:51 2.10 DRILL N DFAL PROD1 RIH to 2000'. Test MWD O.K.RIH to 11300 23:51 - 00:00 0.15 DRILL N DFAL PROD1 Tie in + 10' correction. 5/2/2002 00:00 - 00:53 0.88 DRILL N DFAL PROD1 Continue tie-in log correction +10'. 00:53 - 01 :00 0.12 DRILL N DFAL PROD1 RI H to tag top of cement at 11,518'. 01 :00 - 03:05 2.08 DRILL N DFAL PROD1 Drill hard cement from 11518 to 11536. Make dry trip thru window. 03:05 - 04:00 0.92 DRILL N DFAL PROD1 Thaw blown snow from reel sump. 04:00 - 06:30 2.50 DRILL N DFAL PROD1 POH for building assembly. Flag EOP 9600' 06:30 - 07:50 1.33 DRILL N DFAL PROD1 Re-set motor to 3.0*. P/U TORe orienter. 07:50 - 10:00 2.17 DRILL N DFAL PROD1 RIH wI bha #7 test TORC at 3000' ok TIH correct to EOP +10'. Tagged bottom at 11537'. 10:00 - 18:00 8.00 DRILL N DFAL PROD1 Time drill wI 30L TF to 11541'. Frequent motor stalls. Picked up a gamma ray spike at 11515'. With that we tie'd back into PDC (BHCS 5-13-93) and corrected +6' for corrected TO of 11547'. (Also corrected top of fish should be 11556' including driveshaft and muleshoe). Orient to 90L and trough repeatedly still unable to get past 11547. Orient 145L and trough finally working past (muleshoe?) drilled on to 11559', motor stalled, pick-up 18:00 - 18:15 0.25 DRILL N DFAL PROD1 Crew Change. PJSM POH for bit change. 18:15 - 19:32 1.28 DRILL N DFAL PROD1 Continue drilling to 11,565' oriented 80L. PU and attempt dry tag. Set down at 11,549' Retry with pumps on NO GO. Orient 140L attempt to RIH Stall at 11549'. RIH to 11562' with out pump OK. 19:32 - 19:45 0.22 DRILL N DFAL PROD1 Survey. Inclination 34.6. 19:45 - 22:10 2.42 DRILL N DFAL PROD1 POH to check condition of bit. 22:10 - 00:00 1.83 DRILL N DFAL PROD1 Change out bit. No damage to BHA components. 5/3/2002 00:00 - 00:32 0.53 DRILL N DFAL PROD1 RIH to 2000'. 00:32 - 00:43 0.18 DRILL N DFAL PROD1 Shallow hole test. 00:43 - 02:31 1.80 DRILL N DFAL PROD1 RIH to EOP flag. Correction -17.9' 02:31 - 02:45 0.23 DRILL N DFAL PROD1 Orient 140L 02:45 - 03:00 0.25 DRILL N DFAL PROD1 RIH set down 11,525 uncorrected. 03:00 - 03:21 0.35 DRILL N DFAL PROD1 Orient 60L. 03:21 - 04:40 1.32 DRILL N DFAL PROD1 Tie-in log correction +8' 04:40 - 06:00 1.33 DRILL N DFAL PROD1 Orient having hard stalls at 11562'. Orient 60L hard stall. Orient 90L 06:00 - 13:00 7.00 DRILL P PROD1 Directionally drill 2.7 12.7bpm 3090 psi. FS=3010psi. Drill past 11562' slowly bring TF to highside drilling ahead. ROP 1 0-15'/hr drill to 11655'. 13:00 - 13:40 0.67 DRILL N DFAL PROD1 TORe has lost itself. Not responding to commands. Try to orient close to bottom. 13:40 - 14:45 1.08 DRILL N DFAL PROD1 Trip into 5.5" csg. Tight at 11567'. Put TORe into constant rotation mode to "realign" itself to highside. Orient 30L back through window then 120L through 11565' area. RIH to bottom. Printed: 3/812004 8:42: 17 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-38 A-38 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 3S Start: 4/24/2002 Rig Release: 5/7/2002 Rig Number: N3S Spud Date: 4/30/1993 End: 5/7/2002 513/2002 13:40 - 14:45 1.08 DRILL N DFAL PROD1 Orient to 60-80R 14:45 - 18:00 3.25 DRILL P PROD1 Continue drilling. 60-80R TF 3050 fs 3260 drlg. Broke out of TSHU at 11670' ROP > 60-70'/hr drilled to 11750. 18:00 - 18:15 0.25 DRILL P PROD1 Crew change. PJSM. 18:15 - 19:24 1.15 DRILL P PROD1 Directionally drilling @ 2.7/2.7 bpm 3300 psi. 3050 FS ROP 80fph. drill to 11,797'. 19:24 - 19:42 0.30 DRILL P PROD1 Wiper trip 226'. 19:42 - 19:55 0.22 DRILL P PROD1 Directionally drill t011 ,810'. 19:55 - 20:10 0.25 DRILL P PROD1 PU get survey. 20:10 - 20:40 0.50 DRILL P PROD1 Dirctionally drill 2.7/2.7 bpm 3400 psi 150R TF. 20:40 - 00:00 3.33 DRILL N STUC PROD1 PU for survey. STUCK. Attempt to work free. WO Crude. 5/4/2002 00:00 - 01 :00 1.00 DRILL N STUC PROD1 Spot 10 bbl crude oil. Pull free with 78,000#. Up weight 44,000. 01 :00 - 01 :25 0.42 DRILL P PROD1 Orient 140R 01 :25 - 02:22 0.95 DRILL P PROD1 Directionally drill to 11,860' EOB 2.6/2.6 bpm 3400 psi 3010 psi=FS. Having trouble with stacking. Motor good and strong. Mud is in spec. 02:22 - 05:30 3.13 DRILL P PROD1 POH for BOP test. Test witness waived by Chuck Shieve AOGCC. 05:30 - 06:00 0.50 DRILL P PROD1 Freeze protect coil. LD BHA 06:00 - 06:30 0.50 DRILL P PROD1 Crew change. PJSM testing bope. 06:30 - 07:00 0.50 PROD1 Install TWC. 07:00 - 12:50 5.83 DRILL P PROD1 Testing bope 300 psi low 3500 psi high 5 min each. Cut 100' coil install new CTC pull test 32k PT 4k 12:50 - 13:25 0.58 DRILL P PROD1 Pull TWC 13:25 - 15:10 1.75 DRILL P PROD1 PIU BHA #9 Stab-on well w/injector. 15:10 - 16:20 1.17 DRILL P PROD1 RIH to 2300' shallow hole test tools. TORe not responding to commands and is in constant rotation mode. 16:20 - 17:00 0.67 DRILL N DFAL PROD1 TOH. Plug into TORe to determine if it received commands. No commands had been recorded i.e. not communicating. 17:00 - 17:30 0.50 DRILL N DFAL PROD1 PIU Weatherford new style mechanical orienter. 17:30 - 18:00 0.50 DRILL P PROD1 RIH BHA #10 18:00 - 18:15 0.25 DRILL P PROD1 Crew Change PJSM. 18:15-19:06 0.85 DRILL P PROD1 RIH to 11,360. Orient 30R and RIH without pumps from 11,500 to 11,570. No problem. getting past side tracked fish. 19:06 - 20:06 1.00 DRILL P PROD1 Tie in 6+' correction. 20:06 - 21 :39 1.55 DRILL P PROD1 RIH 11,874' while sending new mud down hole. 21 :39 - 22:00 0.35 DRILL P PROD1 Directionally drill at 2.6/2.6 bpm 3350 psi FS = 3010 psi. to 11,900'. New mud made the diference 22:00 - 22:20 0.33 DRILL P PROD1 PU for survey. 22:20 - 22:54 0.57 DRILL P PROD1 Orient. Having trouble orienting. Requiring 2 to 5 clicks to get one. BHA still in high dog leg area maybe the problem. 22:54 - 23: 15 0.35 DRILL P PROD1 Directionally drill. 23:15 - 23:40 0.42 DRILL P PROD1 Orient 90R. 23:40 - 00:00 0.33 DRILL P PROD1 Directionally drill to 11,930'. 2.6/2.6 bpm 3350 psi FS = 3010 psi TF 90R. ROP 75 fph. 5/5/2002 00:00 - 01 :20 1.33 DRILL P PROD1 Directionally drill to 12050' 2.6/2.6 bpm 3350 psi FS = 3010 psi TF 90R, ROP 70 -80 fpm. Resistivity 20 ohms. 01 :20 - 01 :46 0.43 DRILL P PROD1 Wiper trip 150'. 01:46 - 02:17 0.52 DRILL P PROD1 Orient 90L 9 clicks to get 3. 02:17 - 03:30 1.22 DRILL P PROD1 Directionally drilling at @3110 psi 2.6/2.6 bpm FS 3010 psi 110R TF resistivity falling from 20 ohms to 10.ROP 60fph. 03:30 - 04:10 0.67 DRILL P PROD1 Directionally drilling @ 3300 psi 2.5/2.5 bpm. FT -60. ROP 95 I I Printed: 3/8/2004 8:42:17 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-38 A-38 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 3S Start: 4/24/2002 Rig Release: 5/7/2002 Rig Number: N3S Spud Date: 4/30/1993 End: 5/7/2002 515/2002 03:30 - 04: 1 0 0.67 DRILL P PROD1 fph. Resistivity 6-20 Ohms. Drill to 12,205' 04: 10 - 04:50 0.67 DRILL P PROD1 Wiper trip 300' 04:50 - 05: 17 0.45 DRILL P PROD1 PU and survey. 05:17 - 05:40 0.38 DRILL P PROD1 Orient 90R getting one for one. Must have been hole geometry. 05:40 - 08:00 2.33 DRILL P PROD1 Directionally drilling @ 3,250 psi 2.5/2.5 bpm. TF 90R drill to 12,220'. Evidence of fault @ 12,217' Slow ROP erradic tool face. No mud losses. Drilled to 13345'. 08:00 - 08:50 0.83 DRILL P PROD1 Wiper trip to 11580'. 08:50 - 12:45 3.92 DRILL P PROD1 Directionally drilled f/13345' to 13500'. 12:45 - 14:00 1.25 DRILL P PROD1 Wiper trip. 14:00 - 17:00 3.00 DRILL P PROD1 Directionally drilled f/12500' to 12650'. Small losses 5-10 bbls/hr some of that lost with surface equipment. 17:00 - 17:50 0.83 DRILL P PROD1 Wiper trip to 11575'. No overpulls. 17:50 - 18:00 0.17 DRILL P PROD1 Directionally drill 18:00 - 18:15 0.25 DRILL P PROD1 Crew change PJSM. 18:15 - 19:40 1.42 DRILL P PROD1 Directionally drill to 12734' 19:40 - 19:50 0.17 DRILL P PROD1 Orient 60L 19:50 - 21 :00 1.17 DRILL P PROD1 Directionally drill @ 2.5/2.5 bpm 3450 psi ROP 90 fph. Resistivity 20 Ohms. Drilled to 12,800'. 21 :00 - 22:00 1.00 DRILL P PROD1 Wiper trip 1200' 22:00 - 23:25 1.42 DRILL P PROD1 Directionally drill @ 2.5/2.5 bpm 3,480 psi ROP 82 TF 80L resistivity 20 Ohms. Drilled to 12,810. Resistivity to 2-5 Ohms. 23:25 - 23:30 0.08 DRILL P PROD1 Orient 50R 23:30 - 23:54 0.40 DRILL P PROD1 Directionally drill @2.5/2.4 bpm 3200psi FS. 12870' Resistivity back to 20 Ohms. 23:54 - 00:00 0.10 DRILL P PROD1 Orient 5/6/2002 00:00 - 00:10 0.17 DRILL P PROD1 Orient. 00:10 - 00:38 0.47 DRILL P PROD1 Directionally drill to 12,913'. 00:38 - 01 :45 1.12 DRILL P PROD1 Wiper trip 1,317'. 01 :45 - 02:40 0.92 DRILL P PROD1 Directionally drill to 12,960'. 2.52.5 bpm @ 3,555 psi 02:40 - 03:15 0.58 DRILL P PROD1 Orient. 03:15 - 03:50 0.58 DRILL P PROD1 Directionally drill 12,994'. 2.5 I 2.5 bpm @ 3518 psi. 03:50 - 04:08 0.30 DRILL P PROD1 Survey. 04:08 - 04:25 0.28 DRILL P PROD1 Directionally drill to 13,013' 2.5 12.5 bpm @ 3600 psi. 04:25 - 04:39 0.23 DRILL P PROD1 Orient. 04:39 - 05:00 0.35 DRILL P PROD1 Directionally drill @ 2.3/2.3 bpm 3,430 psi FS 3,100 psi. Motor stalling easy. Drill to 13,031'. reducing pump rate to reduce circulating pressure. 05:00 - 06:30 1.50 DRILL P PROD1 Wiper trip 1,431'. 06:30 - 09:30 3.00 DRILL P PROD1 Directionally drill f/ 13031'. 2.5/2.53550 psi FS to 13122'. Having wt transfer problems. Ordered new mud system. 09:30 - 11 :30 2.00 DRILL P PROD1 Wiper trip to 11570'. No overpulls. 11 :30 - 16:20 4.83 DRILL P PROD1 Directionally drill f/13122'. Swapping out mud FS 3390 @ 2.4 bpm-prior 3200 on-bottom @ 2.6 bpm after. Drilled to 13320' starting to stack weight drilled ahead to 13234'. 16:20 - 16:50 0.50 DRILL P PROD1 Wiper trip to 12900'. 16:50 - 18:00 1.17 DRILL P PROD1 Directionally drill f/13234' to 13,266. Having trouble with motor stalling. No weight transfer problems. Motor tired. FS = 3010 psi 18:00 - 19:50 1.83 DRILL P PROD1 Wiper trip 1665'. 19:50 - 19:55 0.08 DRILL P PROD1 Orient. 119:55 - 20:46 0.85 DRILL P IPROD1 Drill to TO 13,297' 20:46 - 21:45 0.98 DRILL P PROD1 Wiper trip 1695'. I I Printed: 318/2004 8:42:17 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-38 A-38 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 3S Start: 4/24/2002 Rig Release: 5/7/2002 Rig Number: N3S Spud Date: 4/30/1993 End: 5/7/2002 516/2002 21 :45 - 23:00 1.25 DRILL P PROD1 Tie - in Correction -2'. 23:00 - 00:00 1.00 DRILL P PROD1 POH 5/7/2002 00:00 - 00:32 0.53 DRILL P PROD1 Survey 00:32 - 01 :20 0.80 DRILL P PROD1 POH to 11,900' 01 :20 - 02:05 0.75 DRILL P PROD1 Mad pass 11,900 to 11,660' 02:05 - 04:40 2.58 DRILL P PROD1 POH to surface 04:40 - 06: 15 1.58 DRILL P PROD1 Laydown BHA. 06:15 - 06:35 0.33 CASE P COMP PJSM. Review liner running procedures and job asignments. 06:35 - 10:30 3.92 CASE P COMP Pick-up 2 7/8" x 3 3/16" x 31/2" liner and CTLRT. Total length liner 1980.73' (1423' slotted) 10:30 - 11 :00 0.50 CASE P COMP Pick-up stab on injector. Open manual locks on BOP's. Release liner from 3 1/2" combi rams. 11 :00 - 13:30 2.50 CASE P COMP RIH wlliner. Correct depth at flag (-36'). RIH and tag TO 13299' CTM. 13:30 - 14:00 0.50 CASE P COMP Drop ball. Circ to CTLRT. Release from liner 14:00 - 15:00 1.00 CASE P COMP Displace well to 2% KCL water. 15:00 - 17:00 2.00 CASE P COMP POOH. Freeze protect top 2000' with methanol. 17:00 - 21 :00 4.00 CASE P COMP LD CTLRT. Install tree cap and test. Release rig 21 :005/7/02. Printed: 3/8/2004 8:42: 17 AM e e 04-Apr-04 AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well A-38 L2 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 11,584.71' MD 11,608.00' MD 13,050.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ~-J ()~ Date)..} ~).J}f "'I Signed Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Ä 03- ( ~ ~( AUachment(s) e Halliburton Sperry-Sun North Slope Alaska BPXA PBU_ WOA A Pad A-38L2 Survey Report 2004 April, 1 W) Surface Coordinates: 5947394.67 N, 654395.28 E (70015' 47.4519" N, 148045' 06.2494 Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Survey Ref: svy4173 Surface Coordinates relative to Project H Reference: 947394.67 N, 154395.28 E (Grid) Surface Coordinates relative to Structure Reference: 1245.45 N, 912.24 E (True) Kelly Bushing Elevation: 83.80ft above Mean Sea Level Kelly Bushing Elevation: 83.80ft above Project V Reference Kelly Bushing Elevation: 83.80ft above Structure Reference spa....,....,y-sul'! DAIL.L.ING seAVIc:es A Halliburton Company Halliburton Sperry-Sun Survey Report for PBU_ WOA A Pad - A-38L2 BPXA North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 11584.71 44.870 195.670 8818.57 8902.37 6627.69 S 1491.46W 5940737.79 N 653040.04 E 6784.36 Tie On Point 11608.00 52.400 198.160 8833.95 8917.75 6644.39 S 1496.56 W 5940720.99 N 653035.28 E 33.308 6801.82 Window Point 11640.09 56.950 193.130 8852.51 8936.31 6669.59 S 1503.58 W 5940695.65 N 653028.77 E 19.088 6827.98 11673.18 65.570 188.610 8868.41 8952.21 6698.06 S 1509.00 W 5940667.08 N 653023.94 E 28.662 6856.85 11704.97 71.890 175.950 8879.98 8963.78 6727.57 S 1510.11 W 5940637.55 N 653023.44 E 42.068 6885.56 11736.90 79.980 1 67.160 8887.75 8971.55 6758.14 S 1505.53 W 5940607.08 N 653028.65 E 36.791 6913.77 e 11766.18 84.990 169.100 8891.58 8975.38 6786.54 S 1499.56 W 5940578.81 N 653035.20 E 18.327 6939.51 11797.67 85.960 173.320 8894.06 8977.86 6817.55 S 1494.76 W 5940547.90 N 653040.63 E 13.710 6968.08 11831.78 83.850 181.050 8897.10 8980.90 6851.46 S 1493.09 W 5940514.03 N 653042.99 E 23.403 7000.28 11860.24 84.720 185.800 8899.93 8983.73 6879.72 S 1494.79 W 5940485.75 N 653041.88 E 16.886 7027.95 11899.61 85.430 193.710 8903.32 8987.12 6918.35 S 1501 .43 W 5940446.99 N 653036.03 E 20.098 7066.93 11928.28 82.180 199.860 8906.41 8990.21 6945.62 S 1509.65 W 5940419.56 N 653028.37 E 24.149 7095.41 11957.37 83.230 193.350 8910.11 8993.91 6973.25 S 1517.89 W 5940391.76 N 653020.70 E 22.489 7124.25 11989.86 85.960 190.890 8913.17 8996.97 7004.87 S 1524.68 W 5940360.01 N 653014.56 E 11 .288 7156.53 12019.63 85.870 183.690 8915.30 8999.10 7034.31 S 1528.44 W 5940330.50 N 653011.40 E 24.126 7185.88 12049.60 81.300 183.860 8918.64 9002.44 7064.02 S 1530.40 W 5940300.76 N 653010.05 E 15.259 7215.02 12081.24 84.900 186.320 8922.44 9006.24 7095.30 S 1533.19 W 5940269.43 N 653007.90 E 13.748 7245.90 12111.35 84.200 190.020 8925.30 9009.10 7124.96 S 1537.45 W 5940239.68 N 653004.25 E 12.452 7275.61 12142.74 79.540 190.190 8929.74 9013.54 7155.55 S 1542.90 W 5940208.99 N 652999.43 E 14.855 7306.53 12173.32 80.680 186.320 8935.00 9018.80 7185.35 S 1547.22 W 5940179.10 N 652995.72 E 13.012 7336.40 12203.06 83.850 188.610 8939.00 9022.80 7214.57 S 1551.05 W 5940149.82 N 652992.49 E 13.108 7365.56 12234.99 82.350 194.060 8942.84 9026.64 7245.63 S 1557.28 W 5940118.63 N 652986.90 E 17.584 7397.16 12265.37 81.740 194.230 8947.04 9030.84 7274.81 S 1564.63 W 5940089.31 N 652980.15 E 2.083 7427.24 e 12311.89 86.310 203.370 8951.89 9035.69 7318.54 S 1579.54 W 5940045.28 N 652966.15 E 21.866 7473.37 12343.32 91.490 207.240 8952.50 9036.30 7346.94 S 1592.96 W 5940016.61 N 652953.31 E 20.569 7504.33 12378.19 87.980 203.370 8952.66 9036.46 7378.45 S 1607.86 W 5939984.80 N 652939.06 E 14.982 7538.69 12409.20 88.770 200.030 8953.54 9037.34 7407.25 S 1619.32 W 5939955.78 N 652928.19 E 11 .064 7569.51 12439.63 87.360 208.470 8954.57 9038.37 7434.95 S 1631.80 W 5939927.82 N 652916.28 E 28.104 7599.56 12472.54 87.270 213.570 8956.11 9039.91 7463.11 S 1648.73 W 5939899.32 N 652899.93 E 15.482 7631.24 12504.78 83.320 216.030 8958.75 9042.55 7489.49 S 1667.07 W 5939872.57 N 652882.14 E 14.419 7661.59 12535.46 85.690 222.710 8961.70 9045.50 7513.08 S 1686.43 W 5939848.58 N 652863.27 E 23.007 7689.53 12560.24 89.650 226.400 8962.70 9046.50 7530.72 S 1703.79 W 5939830.60 N 652846.27 E 21.833 7711.19 12590.86 92.990 231.320 8962.00 9045.80 7550.85 S 1726.84 W 5939810.00 N 652823.64 E 19.415 7736.79 12620.91 91.050 233.610 8960.94 9044.74 7569.14 S 1750.65 W 5939791.22 N 652800.21 E 9.984 7760.83 12653.33 91.670 234.840 8960.17 9043.97 7588.09 S 1776.94 W 5939771.74 N 652774.31 E 4.248 7786.16 1 Apríl, 2004 . 10:48 Page 2 of 4 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for PBU_ WOA A Pad - A-38L2 BPXA North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 12682.46 94.830 238.180 8958.52 9042.32 7604.14 S 1801.19 W 5939755.20 N 652750.39 E 15.770 7808.15 12716.53 88.240 240.110 8957.60 9041 .40 7621.59 S 1830.41 W 5939737.15 N 652721.54 E 20.154 7832.84 12755.61 90.440 249.430 8958.06 9041.86 7638.23 S 1865.72 W 5939719.79 N 652686.58 E 24.501 7858.38 12784.57 92.460 251.890 8957.32 9041.12 7647.82 S 1893.03 W 5939709.64 N 652659.47 E 10.989 7874.98 12818.61 91.410 256.990 8956.17 9039.97 7656.94 S 1925.79 W 5939699.85 N 652626.90 E 15.288 7892.60 12851.88 90.260 262.260 8955.69 9039.49 7662.93 S 1958.51 W 5939693.19 N 652594.32 E 16.211 7907.19 e 12880.53 89.740 268.060 8955.69 9039.49 7665.34 S 1987.04 W 5939690.19 N 652565.84 E 20.325 7917.21 12909.84 89.560 265.780 8955.87 9039.67 7666.92 S 2016.31 W 5939688.02 N 652536.61 E 7.803 7926.62 12939.46 91.230 260.330 8955.66 9039.46 7670.50 S 2045.70 W 5939683.84 N 652507.30 E 19.243 7937.99 12969.35 91.490 258.750 8954.95 9038.75 7675.92 S 2075.08 W 5939677.81 N 652478.03 E 5.356 7951.14 13003.57 86.570 259.980 8955.53 9039.33 7682.24 S 2108.70 W 5939670.81 N 652444.55 E 14.820 7966.28 13033.17 85.520 257.160 8957.57 9041.37 7688.09 S 2137.64 W 5939664.37 N 652415.74 E 10.145 7979.72 13050.00 85.520 257.160 8958.89 9042.69 7691.81 S 2154.00 W 5939660.30 N 652399.46 E 0.000 7987.72 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well Reference and calculated along an Azimuth of 195.6440 (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13050.00ft., The Bottom Hole Displacement is 7987.72ft., in the Direction of 195.6440 (True). e 1 April, 2004 - 10:48 Page 3 of 4 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for PBU_ WOA A Pad - A-38L2 BPXA North Slope Alaska Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 11584.71 11608.00 13050.00 8902.37 8917.75 9042.69 6627.69 S 6644.39 S 7691.81 S 1491.46 W 1496.56 W 2154.00 W Tie On Point Window Point Projected Survey e Survey tool program for A-38L2 Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 0.00 13050.00 9042.69 MWD Magnetic (A-38) e 1 April, 2004 - 10:48 Page 4 of 4 DrillQuest 3.03.06.002 . WELL LOG TRANSMITTAL . C)ð3--) 8 L{ ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7'" Street Suite # 700 Anchorage, Alaska 99501 RE: Distribution - Final Print{s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 loG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TyPE OR SEPIA PRINT(S) OR CD-ROM FILM COLOR A-38 L-2 3-4-04 Open Hole 1 1 1 ) ti, 1-]7 (0 Res. Eva!. CH 1 1 1 Mech. CH 1 J Caliper Survey ~ . Signed: \-=<.. êÀ ~ 'i.. ¡V~~., C C'\t.~ .c-/~,- Date: RECEIVED t·up 2:ì 0004 . " ". ~_ L Print Name: J~~~k~ OJ! & Gas Cons. Commistion .B¡'''~·MAne ~ "",,1,(010"''' PRoACTivE DÌAGNOSTic SERVicES, INC., PO Box 1 ~69 STAffoRd IX 77477 Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds@memorylog.com Website: www.memorylog.com ~~V~ ... D ~.~\ '\'-L"J . (ffi~ !Æ~!Æ~æ!Æ . AI,ASIiA OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dan Kara CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519 Re: Prudhoe Bay Unit A-38L2 BP Exploration (Alaska), Inc. Permit No: 203-184 Surface Location: 2229' NSL, 1013' WEL, Sec. 35, Tl1N, R13E, UM Bottomhole Location: 226' SNL, 3243' WEL, Sec. 11, TlON, R13E, UM Dear Mr. Kara: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well PBU A-38, Permit No 193-032, API 50-029-22347. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ?--j ~~--~ Randy Ruedrich Commissioner BY ORDER OF THE COMMISSION DATED thisA day of October, 2003 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section WGA lo/~ol¿oo~ _ STATE OF ALASKA _ ALASKA <.WAND GAS CONSERVATION CO~SION PERMIT TO DRILL 20 MC 25.005 1a. Type of work DDrill ØlRedrill rb. Current Well Class D Exploratory ØI Development Oil / D Multiple Zone D Re-Entry D Stratigraphic Test D Service D Development Gas D Single Zone 2. Operator Name: 5. Bond: 1:1 Blanket o Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 2S 100302630-277 PBU A-38L2 /' 3. Address: 6. Proposed Depth: 12. Field I Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 13150 TVD 8941 Prudhoe Bay Field t Prudhoe Bay 4a. Location of Well (Governmental Section): 7. Property Designation: Pool Surface: ADL 047472 2229' NSL, 1013' WEL, SEC. 35, T11N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date: Top of Productive Horizon: /' 4468' SNL, 2539' WEL, SEC. 02, T10N, R13E, UM December 7,2003 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 226' SNL, 3243' WEL, SEC. 11, T10N, R13E, UM 2560 10,560' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation KBE= 15. Distance to Nearest Well Within Pool Surface: X-654395 y-5947395 Zone-ASP4 (Height above GL): 83.80 feet A-42 is 957' -(way at 12,375' MD î6. Deviated Wells: 17. Anticipated pressure (see 20 AAC 25.035) 0 Kickoff Depth 11600 ft Maximum Hole Angle 92 Max. Downhole Pressure: 3477 psig. Max. Surface Pressure: 2600 psig 18. Casing Prqgram $pecifiC9tions Setting D~þth QuaJ"}tity Of cement Size T op< Bottom . (c.f. Ô,.sacks) Hole Casinq Weiqht Grade Couplinq Lenqth MD TVD MD TVD (includinq staqe data) / 3" 2-3/8" 4.6# L-80 STL 1650' 11500' 8834' 13150' 8941' Uncemented Slotted Liner /' 19. PRES~N"'W~LL CONDITION SUMMA~¥(Tobecompleted for~ø(:lriIIANPRe-élJtrYQþerøtic)l'ls) Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1 Junk (measured): 13328 8986 Nt A 13328 8986 NIA ii """'!.!!'-I!!' < ii ··.i.....< }'i <iiii i.<ii ii i Mp·" ii, TVD< StrlJr.tur:11 Conductor 80' 20" 281 cu ft Arcticset 112' 112' ~~ 1_ 3352' 10-3/4" 2054 cu ft CS III, 408 cu ft Class 'G' 3388' 3053' t 11477' 7-5/8" 387 cu ft Class 'G' 11512' 8844' Prnciur.tinn Liner 178' 5-1/2" 140 cu ft Class 'G' 11353' -11531' 8712' - 8860' Liner 1981' 3-1/2" x 3-3116" x 2-7/8" Uncemented Slotted Liner 11347' - 13328' 8707' - 8986' Perforation Depth MD (ft): A-38L 1 : 11720' - 13327' /perfOration Depth TVD (ft): A-38L 1 : 8956' - 8986' A-38: 11524' - 11705' A-38: 8854' - 9005' 20. Attachments o Filing Fee 1:1 BOP Sketch 1:1 Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis o Property Plat o Diverter Sketch o Seabed Report 1:1 Drilling Fluid Program 1:120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dan Kara, 564-5667 Printed Name Dan Kara.x---J Title CT Drilling Engineer Prepared By Name/Number: Siqnature r:~ ) L~ ~ -- Phone 564-5667 Date 1i:> tß/o3 Terrie Hubble, 564-4628 i··.· i\.ii i iii' i, .ii·i"" (" Permit To Drill I API Number: Permit APP;(. Ii I ,see cover letter for Number: 20J - /~Lj 50- 029-22347-61-00 Date: I ø ¿):J other requirements Conditions of Approval: Samples Required D Yes ~No Mud Log Requirea o Yes ~NO Hydrogen Sulfide Measures ~Yes DNo Directional Survey Required ~Vee [JNo Other: ·T~-;.t- ì50PG ¡..:, 3~oo , 9 p~( , j. L~ kcÚ-- BY ORDER OF /0/34)/OJ Approved Bv: ~ J . ~ COMMISSIONER THE COMMISSION Date I .. - Form 10401 Revised 3/2003 OR'GfNA~ Submit In Duplicate e e BP A-38L2 CTD Lateral Summary of Operations: Prudhoe Bay well A-38 is scheduled to have an additional horizontal lateral added utilizing coiled tubing drilling. Prep work will be limited to installing dummy gas lift valves and demonstrating mechanical integrity of wellbore. Sidetracking will occur off a mechanical whipstock, out of 3-3/16" liner at 11600' MD, in the Shublik interval. The target for the lateral is upper Zone 4. Approximately 1550' of 3" bi-center open hole is planned to access the target. The well will be completed / with an uncemented, pre-drilled liner. Production from the existing wellbores will be past the whipstock. Pre-rig Prep work. Planned for mid November, 2003 startup. 1. Install dummy GL V s. Drift tubing/liner with dummy whipstock to KOP. 2. MIT tubing/inner annulus to 3500 psi Nordic 2 CTD - Mill window, Drill and Complete sidetrack: Planned for December 07, 2003 startup. 1. RU Nordic 2, with 2" e-line coil and 7-1/16" BOP stack. 2. Install mechanical whipstock inside 3-3/16" liner for an 11600' MD KOP. 3. Mill 2.74" window from whipstock through the 3-3/16" liner / 4. Directionally drill -1550' to 13150' MD of 3" bi-center hole to access Zone 4 reserves. 5. Run 2-3/8" pre-drilled liner from TD up to 11500' md, approximately 3 joints above window. 6. RD Nordic 2. Install gas lift. Place well on production. / Mud Program: ~ · Milling: Y2# biozan water with 2# biozan sweeps. Drilling: Solids Free Flo-Pro (8.6 ~pg) Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject or Pad 3. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 1650' of 2-3/8" STL 4.6# L-80 pre-drilled liner from TD up into the 3-3/16" liner to 11,500' md. / Well Control: · BOP diagram is attached. / · Pipe rams, blind rams and the CT pack-off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2500 psi. Directional · See attached directional plan, 1550' planned horizontal. Max. planned hole angle is approx. -92 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray will be run over the entire open hole section. · MAD pass openhole Resistivity for determining water saturations. Hazards · The most recent H2S test on A-38Ll was 30 ppm. Prudhoe A Pad is a designated H2S pad. ./ · One mapped fault will be crossed. Lost circulation risk is considered low based on offsets. Reservoir Pressure · Pore pressure is estimated to be 3477 psi at 8800'TVDss (7.6 ppg emw). · Maximum surface pressure with gas (0.1 psi/ft) to surface is 2600 psi ./ TREE = 4-1/16" 5M CIW WELLHEAD= FMC 110-3/4" CSG, 45.5#,J-55 BUTT, ID = 9.953" 3388' Minimum ID :: 2.38" @ 11628' 3-3/16" X 2-7/8" XO 1 TOP OF 5-1/2" LNR 4-1/2" TaG, 12.6#, 13CR, 0.0152 bpf, 10 = 3.958" 13-1/2" LNR, 8.81#, L-80, 0.0086bpf, 10=2.99" 11471' FISH - 1" DMY GLV W/ BK LATCH (12/04/94) 15-1/2" LNR, 17#, 13CR NSCC, 0.0232 bpf, 10 =4.892"1 13-3/16" LNR, 6.2#, L-80, 0.0076bpf, ID = 2.80" PERFORA TION SUMMARY REF LOG: SWS BHCS ON 05/15/93 ANGLE AT TOP PERF: 34 @ 11524' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL DATE 33/8 6 11524-11544 04/13/96 3 3/8 4 11636-11705 OS/24/93 DATE REV BY COMMENTS OS/24/93 ORIGINAL COMPLErION 05/07/02 JDMlKK CTD SIDETRACK OTES: WARNING- RADIO TRANSMITTER IN MONITORING SHACK MUST SETURNED OFF BEFOREANY WELL WORK INVOLVING EXPLOSIVES CAN BEGIN. CONTACT PAD OPERATOR. . 2092' -14-1/2" OTIS SSSV NIP,ID-3.813" I 2-7/8" BLANK LINER 11656 - 11720 12828 - 12918 12981 - 13074 2-7/8" SLOTTED LINER 11720-12828 12918 - 12.981 13074 I I I I 1 LY 13327' 13328' 2-7/8" SLTD LNR, 6.16#, L-80, 0.0055 bpf, 10 = 2.38" TD TE REV BY COMMENT~ PRUDHOE BAY UNIT WELL: A-38L 1 PERMIT No: 2020810 API No: 50-029-22347-60 2229' NSL, 1013' WEL, SEC. 35, T11N, R13E BP Amoco WEI.LPATH DeTAILS t"lan#3A-38!.2 500292234761 hl'fl.WtWellp.attll A-38L1 Tie on MDI 11584.71 Rig: Rot'.O.tum:: V,section ""." 43 3-8 4I30f1fhU. 00:00 ~~~= o+rm~ ~~:~tD REFERENCE INFORMATION Co-ordinate (NIE) Reference: Well Centre: A<3B, True North Vertical (TVD) Reference: System; Mean Sea Level Section (VSj Reference: Slot - 38 (O.OON,Q,QOE) Measured Depth Reference: 43: 38 4/30/1 993 00:00 83,80 Calculation Method: Minimum Curvature 1 11584.71 44.81 195.67 ~ :~m:: ::: ~:::~ 4 117S1ik1Ø 64.80 182.76 5 11809.10 &4.64 175.23' 6 11934,10 it5.U. 194-06 7' 1202:4.10 .a.s.:<:5 180.$1 B 12'1-64.10 82.00 21)1.39 6 1UMi(J 82.46 1.1.1'i 1012474,74 9Q,00 207.81 11 12914.14 $2.4'1 21'-3;79 12 13150.00 n.ð1 :tQ,41' $STtON OETAU,$ +EI>W IJL~9 ~149-1.46 ~víÍ.oo -'1494.67 33.:)2 14.78 :1~~:~ J:gg ~::gg ~15n.38 1.$,01) 2m.GO :~~~~ ~~: :l~: -156495 15,1)0 1tW,OO <11!9i),.ü 1.5.00 270..00 _1636>2$ 1$...00: 75.00 ·'189$,.21 11>,(10 61.30 ·2:2aM 1$,00 nlt.co 6140.93 :~:i:~: 627ß,.73 331$.45 is:: 613:1.79 i5Hf TJ;I;I'ge~ aa1a.~7 -6627.3& M2tI,93 41638,46 8638.49 "664~Ui% 889a.oe .&71$.17 8&9f"ß1 .($8211,&2 iII4W7.&4- ..fW1f2.47 æ~ :~m~~ MI!:lO.79: .747$.2-1 8&.50.11 .7ß7.tJ.:tS U4Q,U .713$.7% MMbtÞl'I TIP KO' · · · · 7 · · ,. n 70 T LEGEND Plan: Plan #3 (A·3S/Plan#3 A~38l2) Azimuths to True North Magnetic North: 25.4r Magnetic Field Strength: 57568nT Dip Angle: 80.820 Date: 1017/2003 Model: bggm2003 M Created By: Brij Potnjs Date: 1Ot7J2003 " -6400 -6500 -6600 -6700 -6800 '2'-6900 ~ -7000~ e - 'II'" -7100 .... - + -7200 - .J: 1:: -7300- \) ~ -7400- - . :;: -7500 .... :s \) -7600- o -7700·' -7800 -791){}' -8000 . -8100 -3200-3100 -3000-2900 -2800-2700 -2600 -2500 -2400 -2300 -2200-2100-2000-1900 -1800-1700-1600-1500 -1400-1300-1200 -1100 -1000 -900 -800 -700 -600 West(-)/East(+) [100ft/in] 6050 6100 6150 6200 6250 6300 6350 6400 6450 6500 6550 6600 6650 6700 6750 6800 6850 6900 6950 7000 7050 7100 7150 7200 7250 7300 7350 7400 7450 7500 7550 7600 7650 7700 7750 7800 7850 7900 7950 Vertical Section at 218.00· [SOft/in] 10I1J2.003···-10;S3-AM· ObP e B.. IIAICD IIUGIIIS -------- IN'TEQ tit BP-GDB Baker Hughes INTEQ Planning Report Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska. Zone 4 Well Centre Site: PB A Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5946131.57 ft 653509.42 ft Latitude: 70 15 Longitude: 148 45 North Reference: Grid Convergence: 35.209 N 32.775 W True 1.17 deg Well: A-38 Slot Name: 38 A-38 Well Position: +N/-S 1245.34 ft Northing: 5947395.15 ft Latitude: 70 15 47.457 N +E/-W 911.93 ft Easting : 654395.71 ft Longitude: 148 45 6.236 W Position Uncertainty: 0.00 ft Well path: Plan#3 A-38L2 500292234761 Current Datum: 43: 384/30/199300:00 Magnetic Data: 10/7/2003 Field Strength: 57568 nT Vertical Section: Depth From (TVD) ft 33.21 A-38L 1 11584.71 ft Mean Sea Level 25.47 deg 80.82 deg Direction Height 83.80 ft Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 +N/-S ft 0.00 218.00 Targets A-38L2 Polygon3.1 0.00 -6753.75 -1429.60 5940614.00 653105.00 70 1441.032 N 148 45 47.801 W -Polygon 1 0.00 -6753.75 -1429.60 5940614.00 653105.00 70 1441.032 N 148 45 47.801 W -Polygon 2 0.00 -6744.73 -1625.47 5940619.00 652909.00 70 1441.120 N 148 4553.496 W -Polygon 3 0.00 -7223.51 -1594.28 5940141.00 652950.00 70 14 36.412 N 148 45 52.587 W -Polygon 4 0.00 -7387.88 -1724.69 5939974.00 652823.00 70 14 34.795 N 148 45 56.377 W -Polygon 5 0.00 -7628.21 -2345.79 5939721.00 652207.00 70 14 32.429 N 148 46 14.431 W -Polygon 6 0.00 -7873.95 -2166.78 5939479.00 652391.00 70 14 30.013 N 148 46 9.225 W -Polygon 7 0.00 -7613.86 -1631.29 5939750.00 652921.00 70 14 32.572 N 148 45 53.660 W -Polygon 8 0.00 -7382.48 -1402.49 5939986.00 653145.00 70 14 34.849 N 148 45 47.010 W A-38L2 Fault1 0.00 -6838.56 -2366.61 5940510.00 652170.00 70 1440.196 N 148 46 15.044 W -Polygon 1 0.00 -6838.56 -2366.61 5940510.00 652170.00 70 1440.196 N 148 46 15.044 W -Polygon 2 0.00 -7212.91 -598.78 5940172.00 653945.00 70 14 36.517 N 148 45 23.644 W A-38L2 FaultA 0.00 -7149.72 -2948.15 5940187.00 651595.00 70 14 37.133 N 148 46 31.948 W -Polygon 1 0.00 -7149.72 -2948.15 5940187.00 651595.00 70 14 37.133 N 148 46 31.948 W -Polygon 2 0.00 -8085.93 -2512.22 5939260.00 652050.00 70 14 27.927 N 148 46 19.265 W A-38L2 T3.1 8896.00 -6818.96 -1517.96 5940547.00 653018.00 70 14 40.391 N 148 45 50.370 W A-38L2 T3.2 8913.00 -7041.60 -1538.53 5940324.00 653002.00 70 14 38.201 N 148 45 50.967 W A-38L2 T3.4 8940.00 -7733.74 -2223.92 5939618.00 652331.00 70 14 31.392 N 148 46 10.888 W A-38L2 T3.3 8960.00 -7497.46 -1648.91 5939866.00 652901.00 70 14 33.717 N 148 4554.173 W ObP e BP-GDB e Baker Hughes INTEQ Planning Report II.. ..... IN'TÊÕ- Annotation 11584.71 8818.57 TIP 11600.00 8828.93 KOP 11615.00 8838.49 3 11759.10 8892.09 4 11809.10 8896.61 5 11934.10 8907.64 6 12024.10 8915.23 7 12164.10 8930.95 8 12294.10 8948.70 9 12474.74 8960.79 10 12914.74 8950.11 11 13150.00 8940.62 TO Plan: Plan #3 Date Composed: 10/7/2003 Identical to Lamar's Plan #3 Version: 4 Principal: Yes Tied-to: From: Definitive Path Plan Section Information 11584.71 44.87 195.67 8818.57 -6627.69 -1491.46 0.00 0.00 0.00 0.00 11600.00 49.81 197.37 8828.93 -6638.46 -1494.67 33.32 32.31 11.12 14.78 11615.00 51.05 196.66 8838.49 -6649.52 -1498.05 9.00 8.24 -4.71 336.00 11759.10 84.80 182.76 8892.09 -6779.17 -1518.25 25.00 23.42 -9.65 336.00 11809.10 84.84 175.23 8896.61 -6828.92 -1517.38 15.00 0.09 -15.06 270.00 11934.10 85.12 194.06 8907.64 -6952.47 -1527.42 15.00 0.22 15.06 90.00 12024.10 85.25 180.51 8915.23 -7041.21 -1538.76 15.00 0.15 -15.05 270.00 12164.10 82.00 201.39 8930.95 -7177.04 -1564.95 15.00 -2.33 14.91 100.00 12294.10 82.46 181.71 8948.70 -7302.60 -1590.59 15.00 0.36 -15.14 270.00 12474.74 90.00 207.81 8960.79 -7475.21 -1636.25 15.00 4.18 14.45 75.00 12914.74 92.47 273.79 8950.11 -7678.25 -1999.27 15.00 0.56 14.99 87.30 13150.00 92.01 238.47 8940.62 -7733.72 -2223.88 15.00 -0.19 -15.01 270.00 Survey ft 11584.71 44.87 195.67 8818.57 -6627.69 -1491.46 5940738.75 653040.57 6140.93 0.00 0.00 TIP 11600.00 49.81 197.37 8828.93 -6638.46 -1494.67 5940727.92 653037.59 6151.39 33.32 14.78 KOP 11615.00 51.05 196.66 8838.49 -6649.52 -1498.05 5940716.80 653034.43 6162.18 Æ-0O 336.00 3 11625.00 53.34 195.40 8844.62 -6657.11 -1500.23 5940709.16 653032.41 6169.51 5.00 336.00 MWD 11650.00 59.12 192.53 8858.51 -6677.27 -1505.22 5940688.90 653027.83 6188.47 25.00 336.78 MWD 11675.00 64.95 189.99 8870.23 -6698.92 -1509.52 5940667.18 653023.98 6208.17 25.00 338.37 MWD 11700.00 70.82 187.68 8879.64 -6721.79 -1513.07 5940644.23 653020.90 6228.38 25.00 339.57 MWD 11725.00 76.72 185.54 8886.62 -6745.62 -1515.82 5940620.35 653018.64 6248.86 25.00 340.43 MWD 11750.00 82.64 183.49 8891.10 -6770.13 -1517.75 5940595.81 653017.21 6269.36 25.00 341.04 MWD 11759.10 84.80 182.76 8892.09 -6779.17 -1518.25 5940586.77 653016.90 6276.78 25.00 341.40 4 11775.00 84.80 180.37 8893.53 -6794.99 -1518.68 5940570.94 653016.79 6289.52 15.00 270.00 MWD 11800.00 84.83 176.61 8895.79 -6819.88 -1518.02 5940546.08 653017.96 6308.72 15.00 270.22 MWD 11809.10 84.84 175.23 8896.61 -6828.92 -1517.38 5940537.05 653018.79 6315.45 15.00 270.56 5 11825.00 84.85 177.63 8898.04 -6844.72 -1516.39 5940521.27 653020.10 6327.30 15.00 90.00 MWD 11850.00 84.87 181.39 8900.28 -6869.61 -1516.18 5940496.39 653020.82 6346.78 15.00 89.78 MWD 11875.00 84.92 185.16 8902.50 -6894.47 -1517.60 5940471.51 653019.91 6367.25 15.00 89.45 MWD 11900.00 84.99 188.92 8904.70 -6919.18 -1520.65 5940446.75 653017.36 6388.60 15.00 89.11 MWD 11925.00 85.08 192.69 8906.87 -6943.64 -1525.32 5940422.20 653013.20 6410.75 15.00 88.78 MWD 11934.10 85.12 194.06 8907.64 -6952.47 -1527.42 5940413.33 653011.28 6418.99 15.00 88.46 6 11950.00 85.12 191.66 8909.00 -6967.91 -1530.94 5940397.82 653008.08 6433.33 15.00 270.00 MWD 11975.00 85.15 187.90 8911.12 -6992.45 -1535.17 5940373.20 653004.35 6455.27 15.00 270.20 MWD 12000.00 85.19 184.14 8913.22 -7017.22 -1537.79 5940348.39 653002.25 6476.40 15.00 270.52 MWD ObP BP-GDB Baker Hughes INTEQ Planning Report e e II.. ..... fNTEQ 85.25 180.51 8915.23 -7041.21 -1538.76 5940324.38 653001.77 6495.90 15.00 270.84 7 85.23 180.64 8915.31 -7042.11 -1538.77 5940323.48 653001.78 6496.62 14.87 100.04 MWD 84.59 184.35 8917.53 -7066.98 -1539.85 5940298.59 653001.20 6516.88 15.00 99.99 MWD 12075.00 83.97 188.07 8920.02 -7091.71 -1542.54 5940273.82 652999.02 6538.02 15.00 99.66 MWD 12100.00 83.38 191.79 8922.77 -7116.18 -1546.82 5940249.27 652995.24 6559.94 15.00 99.29 MWD 12125.00 82.82 195.53 8925.78 -7140.29 -1552.68 5940225.04 652989.88 6582.55 15.00 98.88 MWD 12150.00 82.28 199.27 8929.02 -7163.94 -1560.09 5940201.25 652982.95 6605.75 15.00 98.43 MWD 12164.10 82.00 201.39 8930.95 -7177.04 -1564.95 5940188.05 652978.37 6619.06 15.00 97.94 8 12175.00 82.00 199.74 8932.47 -7187.14 -1568.74 5940177.87 652974.79 6629.36 15.00 270.00 MWD 12200.00 82.03 195.95 8935.94 -7210.70 -1576.32 5940154.16 652967.69 6652.59 15.00 270.23 MWD 12225.00 82.10 192.16 8939.39 -7234.72 -1582.33 5940130.03 652962.17 6675.22 15.00 270.76 MWD 12250.00 82.20 188.38 8942.81 -7259.08 -1586.75 5940105.58 652958.26 6697.14 15.00 271 .28 MWD 12275.00 82.33 184.60 8946.18 -7283.69 -1589.55 5940080.92 652955.96 6718.25 15.00 271.80 MWD 12294.10 82.46 181.71 8948.70 -7302.60 -1590.59 5940062.00 652955.31 6733.79 15.00 272.31 9 12300.00 82.69 182.57 8949.47 -7308.44 -1590.81 5940056.16 652955.21 6738.53 15.00 75.00 MWD 12325.00 83.68 186.21 8952.44 -7333.19 -1592.71 5940031.38 652953.82 6759.20 15.00 74.89 MWD 12350.00 84.70 189.84 8954.97 -7357.81 -1596.18 5940006.69 652950.85 6780.74 15.00 74.46 MWD 12375.00 85.73 193.46 8957.05 -7382.20 -1601.21 5939982.20 652946.32 6803.06 15.00 74.09 MWD 12400.00 86.79 197.06 8958.69 -7406.27 -1607.78 5939958.01 652940.25 6826.07 15.00 73.79 MWD 12425.00 87.86 200.66 8959.85 -7429.89 -1615.85 5939934.23 652932.67 6849.65 15.00 73.55 MWD 12450.00 88.93 204.26 8960.56 -7452.98 -1625.40 5939910.95 652923.60 6873.73 15.00 73.38 MWD 12474.74 90.00 207.81 8960.79 -7475.21 -1636.25 5939888.50 652913.20 6897.92 15.00 73.28 10 12475.00 90.00 207.85 8960.79 -7475.44 -1636.37 5939888.27 652913.08 6898.18 15.09 87.30 MWD 12500.00 90.18 211.60 8960.75 -7497.15 -1648.77 5939866.32 652901.14 6922.91 15.00 87.30 MWD 12525.00 90.35 215.34 8960.63 -7518.00 -1662.55 5939845.19 652887.79 6947.83 15.00 87.31 MWD 12550.00 90.53 219.09 8960.44 -7537.90 -1677.67 5939824.98 652873.08 6972.82 15.00 87.32 MWD 12575.00 90.70 222.83 8960.17 -7556.78 -1694.05 5939805.77 652857.09 6997.78 15.00 87.35 MWD 12600.00 90.87 226.58 8959.83 -7574.54 -1711.64 5939787.66 652839.88 7022.61 15.00 87.39 MWD 12625.00 91.03 230.33 8959.41 -7591.12 -1730.34 5939770.70 652821.52 7047.18 15.00 87.44 MWD 12650.00 91.20 234.07 8958.93 -7606.43 -1750.09 5939754.98 652802.09 7071.41 15.00 87.51 MWD 12675.00 91.35 237.82 8958.37 -7620.43 -1770.79 5939740.57 652781.68 7095.18 15.00 87.58 MWD 12700.00 91.50 241.57 8957.75 -7633.03 -1792.36 5939727.52 652760.37 7118.40 15.00 87.66 MWD 12725.00 91.64 245.32 8957.06 -7644.20 -1814.71 5939715.90 652738.25 7140.96 15.00 87.76 MWD 12750.00 91.78 249.07 8956.31 -7653.89 -1837.75 5939705.74 652715.43 7162.78 15.00 87.86 MWD 12775.00 91.91 252.82 8955.51 -7662.05 -1861.36 5939697.11 652691.99 7183.74 15.00 87.97 MWD 12800.00 92.03 256.57 8954.65 -7668.64 -1885.45 5939690.02 652668.04 7203.77 15.00 88.09 MWD 12825.00 92.14 260.32 8953.74 -7673.64 -1909.93 5939684.51 652643.67 7222.78 15.00 88.22 MWD 12850.00 92.25 264.07 8952.78 -7677.04 -1934.67 5939680.62 652619.00 7240.69 15.00 88.36 MWD 12875.00 92.34 267.82 8951.78 -7678.80 -1959.58 5939678.34 652594.13 7257.42 15.00 88.50 MWD 12900.00 92.42 271.57 8950.74 -7678.93 -1984.56 5939677.70 652569.17 7272.90 15.00 88.65 MWD 12914.74 92.47 273.79 8950.11 -7678.25 -1999.27 5939678.08 652554.45 7281.41 15.00 88.81 11 12925.00 92.47 272.25 8949.67 -7677.71 -2009.50 5939678.41 652544.21 7287.29 15.00 270.00 MWD 12950.00 92.46 268.49 8948.60 -7677.55 -2034.48 5939678.06 652519.24 7302.54 15.00 269.93 MWD 12975.00 92.44 264.74 8947.53 -7679.02 -2059.40 5939676.08 652494.35 7319.05 15.00 269.77 MWD 13000.00 92.41 260.99 8946.47 -7682.12 -2084.18 5939672.47 652469.64 7336.75 15.00 269.61 MWD 13025.00 92.36 257.23 8945.43 -7686.84 -2108.71 5939667.25 652445.22 7355.56 15.00 269.45 MWD 13050.00 92.31 253.48 8944.41 -7693.15 -2132.87 5939660.44 652421.19 7375.42 15.00 269.30 MWD 13075.00 92.25 249.73 8943.42 -7701.04 -2156.57 5939652.07 652397.66 7396.22 15.00 269.14 MWD 13100.00 92.18 245.98 8942.45 -7710.45 -2179.71 5939642.18 652374.72 7417.88 15.00 268.99 MWD 13125.00 92.10 242.22 8941.51 -7721.36 -2202.17 5939630.82 652352.49 7440.31 15.00 268.85 MWD 13150.00 92.01 238.47 8940.62 -7733.72 -2223.88 5939618.02 652331.04 7463.41 15.00 268.71 TO BOP-Tree Well . .. Tree Size . SSV ~ . Master Valve I I ~ Base Flange I Page 1 e e PERMIT TO DRILL 20 MC 25.005 (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary wellbore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent well branch, the application for a Permit to Drill need only include information under (c) of this section that is unique to that branch and need not include the $100 fee. . e TRANSMJT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME jJj} C1 A ~ 311 ¿ L PTD# 203 -/?~ CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) . MULTI The permit is for a new wellbore segment of X LATERAL existing weD ~ <7 - .P,ð?( .4 - 31' Permit No,L'i'.J03:J.. API No. 5'D-o~'_:¿3.,3~ (If API number Production should continue to be reported as last two (2) digits a function' of the original API number stated are between 60-69) above. PILOT BOLE In accordance with 20 AAC 25.005(t), all (PH) records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION . compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Comnanv Name) assumes the liability of any protest to the spacing . exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. 7 Rev: 07/1 0/02 C\jody\templates PTD#: 2031840 Administration ~ D Appr Date RPC 10/30/2003 18 19 20 21 22 23 24 25 26 27 Date 28 10/30/2003 29 30 31 32 33 34 Engineering Appr WGA Appr RPC 35 36 Date 37 10/30/2003 38 39 Geology Geologic C~sioner: fj/~ Company BP EXPLORATION (ALASKA) INC Well Name: PRUDHOE BAY UNIT A-38L2 Program DEV Well bore seg Field & Pool PRUDHOE BAY PRUDHOE OIL - 640150 Initial ClasslType DEV /1-0IL GeoArea 890 Unit 11650 OnlOff Shore ~ Annular Disposal 1 P,ermitfee attache.cL . . . . . . . . . . . . . . . . . . . . .Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . 2 .Leas,e.numberappropriate.. . . . . . . . . . . . . . . . . . . . . . . . . .. . Y,es. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 .U.nlque weltn.arn,e.aod lJumb.er . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y,es. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . '. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. ...... 4 WelUQcat~d ina d.efined pool. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Y,es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Well JQcated proper .dlstance. from driJling unitb.oundary. . . . . . . . . . . . . . . . . . . y,es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 WellJQcat~d properdlstance. from Qtber w~lJs. . . . . . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 .Sufficient acr~age.aYailable In.dJilIilJg unjt. . . . . . . . . . . . . . . . . . . . . . y,es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Jf.d~viated, js. weJlbore platiocJu.ded . . . . . . . . . . . . . . . . . . . . . . . . . y,es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 9 .Op~rator only: affected party. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y,es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 .Operator bas.approprlale.bond lnJorce. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y,es. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . _ . . 11 P,ermil c.ao be lssued wjtbout ço.nserva.tion order . . . . . . . . . . . . . . . . Y,es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 P,eunilc.ao be lssuedwjtbQul ad.mioistratille.approvaJ. . . . . . . . . . . . . .. ... Y,es . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Can permit be approved before 15-daywait Yes 14 WeJUQcaled withio area and. strata authorized by.lojectiolJ Ord,er # (puUO# In.c.omrn,eots) (For. NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 AJI welJs_ wit!1i.n .1l4.llJite.area.of reyiew jd,elJtified (For servj~.w.e[l OOly). . . . . . . . . . . . . . _ .NA . . . . . . . . _ . . . . . _ . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . _ . . . . _ . . . . . . _ . . . . . . _ . . . . _ . . . . _ . 16 Pre-produ.ced iojector; duration. of pre-productionl,ess. than. 3 montbs. (For.ser:.vlee well QnJy) . . NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 ACMP.F"indjng.ofCon$i$leOGy.has bee.nJssued.for.tbis pr.oject. . . . . . . . . . . . . . . . . . . . .NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - - e .C.oodu.ctor string.pJQvlded . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .S.urfa~.casing.pJotec.ts alLknown USDWs . . . . . . . . . . . . . . . . . . . . . .NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .CMTvotadequ.ate.tocirc.utateon.cond.uctor.&su.rf.csg. . . . . . . ... .. .. . .NA . .... . . . . . .. ... . . . . . ... .. .... . ... ..... . . . . . . . . . . . .CMT v.ot adequale.to tie-lnJQng .striog to.surf csg. . . . . . . . . . . . . . . . . . . . . . . .NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .CMTwil! Goyer.aU know.n.pro.ductiYe bori;!:on.s.. ........................... No. . . . . . . . Slotte.d. . . . . . . . . . . . . . . . . . . . . _ . . . . . . . .Casiog de.sigos adequa.te for C,.T~ B& perllJafr.ost . . .. ...... . . . Y,es . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . Adequatetan.kage.oJ reserve pit. . . . . . . . . . . . . . . . . . . . . . . . Y,es . . . . . . . CTDU.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Jf.a.re-drill~ basa. 10A03 for abandonme.nt be,eo apPJQved . . . . . . . . . . . . . . . .NA . . . Multilater.at . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Adequate.w.eUbore. separatjo.nproposed. . . . . . . . . . . . _ . . . . _ . . . . . . _ . . . . . _ . . Y,es. . . . . . . . . . . . . . . . . . _ . . . . _ . . . . . _ . . . . _ _ . . . . . _ . . . . . _ . . . . . _ . . . . . _ _ . . . . _ _ . . . . . . . . Jf.djverter Jeq.uired, dQes jt meet reguJations. . . . . . . . . . . . . . . . . . . . . . . . . . NA . . . . . . . Sidetrack. . . . . . . . . . . . . . . . . . . . . .DJiUilJg flujd.program schematic.& equipJistadequate. . . . . . . . . . . . . . . . . . . . Y,es. Max MW8J ppg.. . . . . . . . . . . . . . . . . . . . . . . BOPEs,.d.othey meet reguJation . . . . . . . . . . . . . . . . . . . . . . . . . . . Y,es . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . .BOPEpre.ss ra.tiog appropriate; .testlo(pu.t psig i-".comments) . . . . . . . . . . . . . . . .Y,es Testt035QO. psLMS~ 26.00 psi.. . . . . . . . . Choke.llJanjfold cQmpJies w/APtR~-53 (May 84) . . . . .. ... Y,es. . . . . . . . . . . . . . . . . . . . . . Work will OGc.ur withoutoperatjo.n .sbutdown. . . . . . . . . . . . . Y,es . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . .Is presence. Qf H2S gas. probable. . . . . . . . . . . . . . . . . . Y,es . . . . . . . 30. ppm. . . . _ . . . . . _ . . . . . _ . . . . . . . . . MecbanicaLC9lJdJtlonotwell$wlthin80RYerified(For.s.ervjcew~1J0nly). . . .... . . . NA . . . . . . . . .. ..... . . . .. . . ........ . . . . ...... .. . . . . - - - - - ~ - - - - - - - - - - - - - -- - - - - -- e - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- P,ermil cao be lssued w!o. hYdrogen. s.utfide measures. .D.ata.pJeselJted on. pote.ntial oveJpressure .zones. . S,elsmic.analysJs. of shaJlow gaszolJes. . . . . . . . . . . . . . .S,eabed .condjtioo survey (if off-shore) . . . . . . . . . . . . . . . . . . . . Conta.ct namelphoneJor.we~kly progress. reports [exploratOry .only]. . . . . . . . - - - - - - . . . . . . . . . No. . . . . NA ....... .NA............... . . NA ......... NA.................... - - - - - - - - - - - -- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - ~ - - - - - - - - - - - ~ - - - - - - ~ - - - - - - ~ - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - ~ Date: /O!3OJM Date e e Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information. information of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drtlting Services LIS Scan Utility e ¿).tJ$ --I ¡ 'f /2571 $Revision: 3 $ LisLib $Revision: 4 $ Wed May 12 10:09:46 2004 R~&t!2, f- Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/05/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... .UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Alaska Oil & Gas Cons. Commission Anchorage Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/05/12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... .UNKNOWN Comments.... ............ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA A-38L2 500292234761 BP Exploration (Alaska) Inc. Sperry-Sun Drilling Services 12-MAY-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 MW0002947638 B. JAHN S. KOLSTAD / MWD RUN 3 MW0002947638 B. JAHN S. KOLSTAD / MWD RUN 4 MW0002947638 B. JAHN S. KOLSTAD / JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 MW0002947638 B. JAHN R. WHITLOW / # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 35 llN BE 2229 1013 83.80 # WELL CASING RECORD OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT silt (IN) SIZE (IN) DEPTH (FT) 3.000 3.188 11608.0 e # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 11608'MD, AND THE BOTTOM WAS AT 11613'MD. 4. THE PURPOSE OF MWD RUN 1 WAS TO POSITION THE WHIPSTOCK - NO DATA WERE ACQUIRED. 5. MWD RUNS 2 - 5 COMPRISED DIRECTIONAL WITH NATURAL GAMMA RAY (PCG) UTILIZING SCINTILLATION DETECTORS. 6. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A PDS GAMMA RAY LOG RUN IN THE A-38L2 WELLBORE ON 3/4/04, PER E-MAIL FROM K. COONEY, SIS/BP, DATED 5/11/04. LOG HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. 7. MWD RUNS 2 - 5 REPRESENT WELL A-38L2 WITH API#: 50-029-22347-61. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13055'MD/8959'TVDSS. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD SMOOTHED NATURAL GAMMA RAY. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation.. .... .04/05/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 11600.5 11623.5 STOP DEPTH 13025.0 13049.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH 11600.5 11609.0 11627.0 11634.0 11636.0 11639.5 11643.0 11646.5 11654.5 11656.0 11661.0 11665.0 11668.5 11671.5 11674.5 11682.5 11690.5 11704.0 11713.5 11738.5 11745.5 11776.0 11785.5 11810.0 11816.0 11818.5 11824.5 11833.5 11849.5 11870.5 11873.0 11887.5 11898.0 11906.5 11914.0 11923.5 11932.0 11990.5 11999.0 12009.0 12018.0 12021.0 12069.0 12079.5 12083.5 12088.5 12091.0 12101.5 12106.5 12111.5 12117.0 12121.5 12123.0 12126.0 12142.0 12147.0 12167.0 12174.0 12181.0 12204.5 12225.5 12248.0 12253.0 12256.5 12264.0 12290.0 12301.5 e e GR 11600.0 11608.5 11626.5 11633.0 11635.5 11638.5 11642.0 11645.0 11653.5 11655.0 11660.0 11663.5 11668.0 11670.5 11673.5 11681.5 11690.0 11703.5 11711. 0 11734.0 11742.5 11773.5 11783.0 11808.0 11813.5 11816.0 11823.0 11834.0 11848.0 11867.0 11871.0 11883.5 11894.5 11903.0 11910.5 11920.5 11928.5 11986.5 11994.0 12004.5 12012.5 12016.5 12066.0 12074.5 12078.5 12084.0 12087.0 12096.0 12100.5 12106.0 12112.0 12117.0 12119.0 12121.5 12135.5 12141.0 12166.0 12173.0 12180.0 12204.5 12225.0 12248.5 12253.5 12256.0 12263.0 12289.0 12301.5 12314.5 12318.0 12353.5 12362.5 12378.0 12383.5 12389.5 12394.5 12407.5 12409.5 12415.0 12429.5 12438.5 12453.0 12486.5 12497.5 12502.0 12510.0 12515.0 12525.5 12550.0 13049.0 $ 12314._ 12317.0 12352.5 12363.0 12379.0 12385.0 12390.5 12395.5 12408.0 12410.0 12417.0 12431.0 12440.5 12456.5 12487.5 12496.5 12504.0 12511.5 12515.5 12527.0 12551.0 13050.0 e # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ BIT RUN NO 2 3 4 5 MERGE TOP 11600.0 11640.0 11740.5 12583.0 MERGE BASE 11640.0 11740.5 12583.0 13050.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units......... ..Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value. .................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT FT/H API Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Name DEPT ROP GR MWD MWD Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11600.5 13049 12324.8 2898 11600.5 13049 ROP MWD FT/H 0.09 3776.9 58.0854 2852 11623.5 13049 GR MWD API 21. 73 1262.53 107.923 2850 11600.5 13025 First Reading For Entire File......... .11600.5 Last Reading For Entire File.......... .13049 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... version Number........ ..4IÞ0.0 Date of Generation...... .04/05/12 Maximum Physical Record. .65535 File Type............... .LO Next File Name........ ...STSLIB.002 Physical EOF File Header Service name......... ... .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/05/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name... ... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 e header data for each bit run in separate files. 2 .5000 START DEPTH 11600.0 11623.0 STOP DEPTH 11616.0 11640.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 01-MAR-04 Insite Memory 11640.0 11623.0 11640.0 TOOL NUMBER TLG013 3.000 11608.0 Water Based 8.40 60.0 13600 155.0 # e e NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.... ... ......... ..0 Data Specification Block Type... ..0 Logging Direction............... ..Down Optical log depth units......... ..Feet Data Reference Point............ ..Undefined Frame Spacing........... ........ ..60 .1IN Max frames per record........... ..Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD020 GR MWD020 Units FT FT/H API Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11600 11640 11620 81 11600 11640 ROP MWD020 FT/H 0.09 142.55 20.1103 35 11623 11640 GR MWD020 API 752.79 1240.57 1134.02 33 11600 11616 First Reading For Entire File......... .11600 Last Reading For Entire File.......... .11640 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..04/05/12 Maximum Physical Record. .65535 File Type............... .LO Next File Name...... .... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/05/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD header da_for 3 .5000 each bit run in separate ftltS. Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ START DEPTH 11608.5 11640.5 STOP DEPTH 11 716.0 11740.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type............... ...0 Data Specification Block Type... ..0 Logging Direction.............. ...Down Optical log depth units........ ...Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value.................... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 01-MAR-04 Insite Memory 11740.0 11640.0 11740.0 57.0 71.9 TOOL NUMBER TLG015 3.000 11608.0 Flo Pro 8.70 60.0 9.0 23000 5.8 154.3 e e Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11608.5 11740.5 11674.5 265 11608.5 11740.5 ROP MWD030 FT/H 0.98 79.75 40.9495 201 11640.5 11740.5 GR MWD030 API 30.14 1190.88 162.424 201 11608.5 11716 First Reading For Entire File......... .11608.5 Last Reading For Entire File.......... .11740.5 File Trailer Service name. ........... .STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .04/05/12 Maximum Physical Record. .65535 File Type... .... ........ .LO Next File Name.. ........ .STSLIB.004 Physical EOF File Header Service name........ .... .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/05/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 4 header data for each bit run in separate files. 4 .5000 START DEPTH 11716.5 11741.0 STOP DEPTH 12559.5 12583.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 03-MAR-04 Insite Memory 12583.0 11740.0 12583.0 44.9 91. 5 # e TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units. . . . . . . . . . .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record. ........... .Undefined Absent value...... ... .... ....... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD040 GR MWD040 Units FT FT/H API Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code e TOOL NUMBER TLG015 3.000 11608.0 Flo Pro 8.70 60.0 8.5 22000 5.4 175.0 Offset o 4 8 Channel 1 2 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11716.5 12583 12149.8 1734 11716.5 12583 ROP MWD040 FT/H 0.22 2305.24 62.6044 1685 11741 12583 GR MWD040 API 26.89 1262.53 114.519 1687 11716.5 12559.5 First Reading For Entire File......... .11716.5 Last Reading For Entire File.......... .12583 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... .4IÞ/05/12 Maximum Physical Record. .65535 File Type.......... .... ..LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/05/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 5 e header data for each bit run in separate files. 5 .5000 START DEPTH 12560.0 12583.5 STOP DEPTH 13026.0 13050.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # 05-MAR-04 Insite Memory 13050.0 12583.0 13050.0 85.6 93.0 TOOL NUMBER TLG013 3.000 11608.0 Flo Pro 8.60 .0 9.0 23000 6.6 183.9 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION e e (IN) : # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... ............. ..0 Data Specification Block Type... ..0 Logging Direction. ............... . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT FT/H API Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Name DEPT ROP GR MWD050 MWD050 Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12560 13050 12805 981 12560 13050 ROP MWD050 FT/H 0.18 3776.9 54.7422 934 12583.5 13050 GR MWD050 API 21.73 196.63 54.408 933 12560 13026 First Reading For Entire File......... .12560 Last Reading For Entire File.......... .13050 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/05/12 Maximum Physical Record. .65535 File Type............... .LO Next File Name... ....... .STSLIB.006 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/05/12 Origin.................. .STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/05/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... .UNKNOWN Continuation NUmber.....~ ~ Next Reel Name.. . . . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File