Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
{20:3 - aO L Well History File Identifier
(Count does include cover sheet)
,,/' YES
Organizing (done)
o Two-sided 1111111111111111111
R~CAN
o Color Items:
o Greyscale Items:
DIGITAL DATA
~Diskettes, No. í.:l,.
o Other, NofType:
o Poor Quality Originals:
o Other:
NOTES:
~,?,/tia
BY: ~
Date:
Project Proofing
BY: ~
Dale ~3/ £i;
~ x 30 = 10 0
Daled-/a/00
Scanning Preparation
BY: ~
Production Scanning
Stage 1
Page Count from Scanned File: 7;:>,
Page Count Matches Number in sc.an?ing¡preparation:
~ Date: d.-/3 () (p
If NO in stage 1 page(s) discrepancies were found:
BY:
Stage 1
BY:
Maria
Date:
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Maria
Date:
Comments about this file:
o Rescan Needed 1111111111111111111
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
o Logs of various kinds:
o Other::
vnP
111111111111111111I
mp
Isl
Isl
+
lJ- = TOTAL PAGES rf~
(Count does not include cover Je~t) 1/1111]
Isl V f ~r
1111111111111111111
YES
NO
Isl V1A P
NO
Isl
/111111111111111111
/111111111111111111
Isl
Quality Checked
1111111111111111111
10/6/2005 Well History File Cover Page.doc
• •
1wY>:y~b:. ..~..
-• ~
o3io~~ZOOs
DO NOT PLACE
~~r~
tom.
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs_Inserts\Microfilm_Marker.doc
~t J~~
DATA SUBMITTAL COMPLIANCE REPORT
1/3/2006
Permit to Drill 2032010
Well Name/No. PRUDHOE BAY UN POL W-205L 1
Operator BP EXPLORATION (ALASKA) INC
>" f/III.J. 13 ~ 2.t,,~
API No. 50-029-23165-60-00
MD 10680 ~
TVD 5171_
Completion Date 12/28/2003""-- Completion Status 1-01L
Current Status 1-01L
UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, PWD, AZI DEN, NEW, ABI (data taken from Logs Portion of Master Well Data Maint
Well Log Information: .
Logl Electr
Data Digital Dataset Log Log Run Interval OHI
Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
~ C Lis 13318 Induction/Resistivity 7150 10636 Open 10/17/2005 GR RHO DRHO NPHI
RES (LIS format + .pds
graphics MDITVD)
~ D Wrd- "h.. Directional Survey 0 9284 1/26/2004 PB1
~ Directional Survey 0 9284 1/26/2004 PB1
""ED D WoFd 1\.) \.. Directional Survey 0 1 0680 1/26/2004
ßpt Directional Survey 0 10680 1/26/2004
~ C Lis 13319 Induction/Resistivity 7150 9284 Open 1 0/17/2005 PB 1 GR RHO DRHO
NPHI RES (LIS format +
.pds graphics MDITVD)
~ I nd uction/Resistivity f"If) 25 Blu 7150 10636 Open 1 0/17/2005 GR RHO DRHO NPHI RES
Log Induction/Resistivity ""I/() 25 Blu 7150 10636 Open 1 0/17/2005 GR RHO DRHO NPHI RES
"1og I nduction/Resistivity flO 25 Blu 7150 9284 Open 10/17/2005 PB 1 GR RHO DRHO .
NPHIRES
v 1V()
Log I nduction/Resistivity 25 Blu 7150 9284 Open 10/17/2005 PB 1 GR RHO DRHO
NPHIRES
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
Permit to Drill 2032010
MD 10680
TVD 5171
ADDITIONAL INFORM~ON
Well Cored? Y Nµ
Chips Received? --Y 1 t~
Analysis
Received?
~
Comments:
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
1/3/2006
Well Name/No. PRUDHOE BAY UN POL W-205L 1
Operator BP EXPLORATION (ALASKA) INC
Completion Date 12/28/2003
Completion Status 1-01L
Current Status 1-01L
Daily History Received?
~:
Formation Tops
"'{)
Date:
API No. 50-029-23165-60-00
UIC N
r;- Jo-- ~ ~ ---
.
.
SchlumbBPgep
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well Job # Log Description
W-205L 1 40009936 OH LDWG EDIT OF LWD ADN & IMP
W-205L 1 40009936 MD VISION SERVICE
W-205L 1 40009936 TVD VISION SERVICE
W-205L 1 PB1 40009936 OH LDWG EDIT OF LWD ADN & IMP
W-205L 1PB1 40009936 MD VISION SERVICE
W-205L 1PB1 40009936 TVD VISION SERVICE
W-205L2 40009937 OH LDWG EDIT OF LWD ADN & IMP
W-205L2 40009937 MD VISION SERVICE
W-205L2 40009937 TVD VISION SERVICE
W-209 10980560 SBHP SURVEY
12/14/03
12/14/03
12/14/03
12/14/03
12/14/03
12/14/03
12/21/03
12/21/03
12/21/03
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
Date Delivered:
/7 O~~\-
NO. 3498
Company: Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Polaris
Date
BL
Color
CD
8/14/05
Schlumberger-DCS
2525 Gambell 51, Suite 400
Anchorage, Ap995 -2838 IN
A TTN: Beth ^
Received by: U
)~3-À.~(
10/13/05
.
.
F:le-
>~
t.
. STATE OF ALASKA __
ALASKA: AND GAS CONSERVATION COMI\tWIION
WELL COMPLETION OR REcOMPLETION REPORT AND LOG
1a. Well Status: 1'81 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20MC 25.105 20MC 25.110
PWD, AZI DEN, NEU, ABI
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE
Top BOTTOM Top BOTTOM SIZE
Surface 108' Surface 108' 48"
29' 3985' 29' 3180' 13-1/2"
26' 7173' 26' 5112' 9-7/8"
7168' 10640' 5111' 5172' 6-3/4"
6892' 7143' 5016' 5103' N/A
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3703' NSL, 1196' WEL, SEC. 21, T11 N, R12E, UM
Top of Productive Horizon:
3988' NSL, 3334' EWL, SEC. 22, T11N, R12E, UM (08e)
Total Depth:
1864' NSL, 3408' EWL, SEC. 15, T11N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 612049 y- 5958680 Zone- ASP4
TPI: x- 616574 y- 5959034 Zone- ASP4
Total Depth: x- 616594 y- 5962190 Zone- ASP4
18. Directional Survey 1'81 Yes 0 No
21. Logs Run:
MWD, GR, RES,
22.
CASING
SIZE
20" x 34"
10-3/4"
7-518"
4-1/2"
7-5/8" x 4-1/2"
WT. PER FT.
215.5#
45.5#
29.7#
12.6#
29.7# 112.6#
GRADE
A53
L-80
L-80
L-80
L-80
23. Perforations open to Production (MD + TVD of Top- and
Bottom Interval, Size and Number; if none, state' none"):
4-1/2" Slotted Section
MD TVD MD TVD
7246' -7329' 5125' - 5132'
7339' - 10570' 5133' - 5174'
One Other
5. Date Comp., Susp., or Aband.
12/28/2003
6. Date Spudded
12/14/2003
7. Date T.o. Reached
12/17/2003
8. KB Elevation (ft):
KBE = 80.90'
9. Plug Back Depth (MD+ TVD)
10680 + 5171
10. Total Depth (MD+TVD)
10680 + 5171
11. Depth where SSSV set
(Nipple) 2584' MD
19. Water depth, if offshore
N/A MSL
SIZE
4-1/2", 12.6#, L-80
Revised: 03/23/04, Put on Production
1 b. Well Class:
1'81 Development 0 Exploratory
o Stratigraphic Test 0 Service
12. Permit to Drill Number
203-201
13. API Number
50- 029-23165-60-00
14. Well Name and Number:
PBU W-205L 1
15. Field I Pool(s):
Prudhoe Bay Field I Polaris Pool
Ft
Ft
16. Property Designation:
ADL 028263
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
CEMENTING RECORD
260 sx Arctic Set (Approx.)
897 sx PF 'L', 352 sx Class 'G"
561 sx Class 'G'
Uncemented Slotted Liner
Uncemented Tieback Liner
AMOUNT
PULLED
DEPTH SET (rVlD)
6895'
PACKER SET (MD)
6770'
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 110 Bbls Diesel
26.
Date First Production:
March 1, 2004
Date of Test Hours Tested PRODUCTION FOR
3/11/2004 4 TEST PERIOD ...
Flow Tubing Casing Pressure CALCULATED .......
Press. 300 1500 24-HoUR RATE"""
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Gas Injection
OIL-BBL GAs-McF WATER-BBL
408 51 -0-
OIL-BBL GAs-McF WATER-BBL
2,450 304 -0-
CHOKE SIZE I GAS-OIL RATIO
1760 124
OIL GRAVITY-API (CORR)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
Form 10-407 Revised 12/2003
v.\\G\NAL
CONTINUED ON REVERSE SIDE
2D1J4
__S\ßfl"
..uA {) ~ '~;
."""",. "" c'
~y
-
28~
GEOLOGIC MARKERS.
29.
.RMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff Zone OBc
7177'
5113'
None
Schrader Bluff Zone OBb
8863'
5153'
Schrader Bluff Zone OBc
9165'
5160'
Iffl-' ð(
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~Q)W, ~ Title Technical Assistant Date 03,':;:l...?xOC¡
PBU W-205L 1 203-201 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Michael Triolo, 564-5774
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
STATE OF ALASKA
ALASKA AND GAS CONSERVATION COM~ION
WELL cOM~TION OR REcOMPLETION REPORWND LOG
1a. Well Status: IS! Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
NEU, ABI
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTiNG DEPTH TVD HOLE
Top BonoM Top BOTTOM SIZE
Surface 108' Surface 108' 48"
29' 3985' 29' 3180' 13-1/2"
26' 7173' 26' 5112' 9-7/8"
7168' 10640' 5111' 5172' 6-3/4"
6892' 7143' 5016' 5103' NIA
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3703' NSL. 1196' WEL, SEC. 21, T11 N, R12E, UM .
Top of Productive Horizon:
3988' NSL. 3334' EWL, SEC. 22, T11 N, R12E, UM (OBc)
Total Depth:
1864' NSL, 3408' EWL, SEC. 15, T11N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 612049' y- 5958680' Zone- _~?£'±_
TPI: x- 616574 y- 5959034 Zone- ASP4
.--.-.-....,--------
Total Depth: x- 616594' y- 5962190 Zone- ASP4
18. Directional Survey IS! Yes 0 No
21. Logs Run:
MWD, GR, RES, PWD, All DEN,
22.
CASING
SIZE
20" x 34"
10-3/4"
7-5/8"
4-1/2"
7-5/8" x 4-1/2"
WT. PER FT.
215.5#
45.5#
29.7#
12.6#
29.7# 112.6#
GRADE
A53
L-80
L-80
L-80
L-80
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Section
MD
7246' - 7329'
7339' - 10570'
MD
TVD
5125' - 5132'
5133' - 5174'
26.
Date First Production:
Not on Production Yet
Date of Test Hours Tested
One Other
5. Date Comp., Susp., or Aband.
12/28/2003 I
6. Date Spudded i?:> ,~
12/.1412003Py
,
7. Date T.D. Reached
12/17/2003
8. KB Elevation (ft):
KBE = 80.90'
9. Plug Back Depth (MD+ TVD)
. 10680 + 5171
10. Total Depth (MD+ TV D)
· 10680 + 5171!
11. Depth where SSSV set
(Nipple) 2584' MD
19. Water depth, if offshore
NIA MSL
24,
SIZE
4-1/2", 12.6#, L-80
TVD
1 b. Well Class:
IS! Development 0 Exploratory
o Stratigraphic Test 0 Service
12. Permit to Drill Number
203-201
13. API Number
50- 029-23165-60-00
14. Well Name and Number:
PBU W-205L 1
15. Field I Pool(s):
Prudhoe Bay Field I Polaris Pool
Ft
16. Property Designation:
Ft ADL 028263
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
'~~é7ù '7/7'3 '/n....è>
-'5-1/2 '7'tD
CEMENTING RECORD
260 sx Arctic Set (Approx.)
897 sx PF 'L', 352 sx Class 'G"
561 sx Class 'G'
Uncemented Slotted Liner
Uncemented Tieback Liner
AMOUNT
PULLED
TUBING RECORD
DEPTH SET (MD)
6895'
PACKER SET (MD)
6770'
25.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 110 Bbls Diesel
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
NIA
OIL-BBL GAs-McF WATER-BBL
CORE DATA
Brief descriptio~ 0: ~ithology, por~~ity, f~actures, apparent dips and presence of oil, gas or water (at~
Submit core ChipS, If none, state none, c.........."
! (ii¡":, t <.; JAN 2 9 2004
¡ J!}&.f!b:!i-
L"~~~\GINAI
CONTINUED ON REVERSE SIDE
PRODUCTION FOR
TEST PERIOD ...
CALCULATED ........
24-HoUR RATE"""
OIL-BBL
Flow Tubing Casing Pressure
Press.
27.
None
Form 10-407 Revised 12/2003
GAs-McF
WATER-BBL
./
~~v
CHOKE SIZE I GAS-OIL RATIO
OIL GRAVITY-API (CORR)
t'rE~frjcessary).
8i
mllIISQfl
fEB 0:) 2ø
-
28.
GEOLOGIC MARKER.
29.
JRMATION TESTS
.".'
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff Zone OBc
7177'
5113'
None
Schrader Bluff Zone OBb
8863'
5153'
Schrader Bluff Zone OBc
9165'
5160'
r, ~,\ ....... {\ LG \Y\
J¡.\\'t ik '"
Il'\. <\ ;j
I...·Û"~
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble /(Ô~ . ~ Title Technical Assistant Date 01·:::z.9 ..OL(
PBU W-205L 1 203-201 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Michael Triolo, 564-5774
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
o RIG 1 ~LÔ ,
.
.
Well:
Field:
API:
Permit:
W-205L 1 & L2
Prudhoe Bay Unit
50-029-23165-60 & -61
203-201 & 203-202
Accept:
Spud:
Release:
Rig:
12/1 0/03
12/14/03
12/28/03
Nabors 9ES
. .
-------".- ....._-~.~~y---------_.~".'"".y~y~~~-_.~...~._-"--_._-.----.-.,-.,-"'." ..__."-"---~-"---,,-_.'~..".,",,"._-
~____"_"_"__M__~'_'_"__'__"_
PRE-RIG WORK
11/30/03
WELL SHUT IN UPON ARRIVAL. DRIFT NEW 1.5" CT WI 0.937" STEEL BALL. MU BAKER MHA WI 2.5" JSN.
RIH AND JET TUBING WI HOT CRUDE. TAGGED TOP OF PARRAFIN PLUG AT 3008' CTMD AND MELTED
THROUGH VARIOUS PLUGS DOWN TO 3970' CTMD.
12/01/03
CONTINUE JETTING TUBING AND MANDRELS WI HOT CRUDE TO 6580' CTMD. PLACED WELL IN TEST
AND RIH TO 10,145 WHERE LOCKUP OCCURED. FLAGGED COIL AT 10,100' CTMD FROM PROD LOGGING
RUN AND POOH. MU PDS M GR/CCL STP AND RIH TO 6500' CTMD' AND WAIT FOR WELL TO STABILIZE.
MADE STP STOP COUNTS AT 6500', 7600', 8100', 8600', 9100', 9600', 10090'; CTMD. LOGGED STP UPIDOWN
PASSES AT 30 & 60 FPM. AVERAGE TEST RATE = 917 BPD GFR, 862 BOPD, 2.89 MM GL, 1.2 MM
FORMATION GAS, 418 PSI, 59 DEG F. FLAGGED COIL AT 7500' CTMD, AND MADE JEWLERY LOG UP TO
6200'. PULLED SURFACE SAMPLES FROM LIQUID LEG OF TEST SEPARATOR. MADE +30 FT CORRECTION
TO TIE-IN TO SWS DENSITY NEUTRON 23-AUG-03 TO 06-SEP-03, RUN #5. LAY DOWN PDS TOOLS AND
MU BAKER 2.50" IBP (1-3/8" JDC FN, 2 X 0.53' RUBBER ELEMENT, 5500# PULL RELEASE, OAL=11.58') AND
RIH TO FLAG. RESET COUNTER TO CEL @ 7525' AT FLAG.
12/02103
DROP BALL, WAIT 3 HOURS FOR TEMPERATURE STABILIZATION, AND SET BAKER 2.50" IBP AT 7610'.
TAG IBP W/3K, PLUG SET. POOH CHASING OUT AT 80% W/1% KCL TO 2500'. FREEZE PROTECT FROM
2500' TO SURFACE. PRESSURE TEST IBP TO 1000 PSI - PASS. FP FLOWLINE WI 15 BBLS 60/40 MEOH.
RDMO. WELL LEFT SHUT IN. JOB COMPLETE.
12/03/03
ATTEMPT TO SET CATCHER, FAILED DUE TO PARAFIN. LRS PUMPED 300 BBLS HOT CRUDE DOWN lA,
RETURNS UP TUBING. DRIFT TO TT @ 6650' WI 3.70 GAUGE RING & 41/2" BRUSH. SET 4 1/2" XN
CATCHER SUB @ 6534' SLMD. RIH TO PULL SPMG.
12/04103
PULL 1" SPMG FROM STA. # 1. @ 6508' MD. BK LATCH. (LEFT POCKET OPEN). PULL 1" SIO FROM STA. #2.
@ 6306' MD. 22/64" PORT. BK LATCH. FIRST ENERGY PUMPED 60 BBL. OF METHANOL TO CLEAR UP
HYDRATES. PULL 1" DOME FROM STA. # 4. @ 3015' MD. 16/64" PORT. BK LATCH. SET DGLV STA. #4. BK
LATCH. SET DGLV STA. #2. BK LATCH. SHIFT OPEN BAKER CMD SLIDING SLEEVE. PULL XN CATCHER
SUB (EMPTY).
12/06103
LOG SLIM CEMENT BOND LOG. TOOL = 44.2 FT X 1.69" MAX OD. SET DOWN AT 7180' MD (HAW) AND LOG
UP TO 6100' MD. ON DESCENT TO LOG REPEAT SECTION OF 4.5" TUBING, TOOL GOT STUCK IN GLM AT
6196 FT. PUMPED 45 BBLS CRUDE DOWN lA, THROUGH SLIDING SLEEVE, RETURNS TO FLOWLINE -
PULLED 1850 LBS (1200 LBS OVER) AND TOOL CAME FREE. TUBING PUNCHER (2ND RIH) = 22.4 FT X
1.69" MAX OD. INTERVAL SHOT = 6454-6456 FT MD. WHP BEFORE AND AFTER SHOT = 200 PSI. lAP
BEFORE AND AFTER SHOOT = 300 PSI.
12/07/03
A 3 5/8" CHEMCIAL CUTTER WAS RUN TO CUT THE PREMIER PACKER @ 6440'. DEPTHS FOR CUT ZONE
GIVEN BY BAKER. TD NOT TAGGED. WELL WAS LEFT SHUT IN. PAD OPERATOR NOTIFIED.
TIIIO= 160/300/40 CIRC-OUT TUBING & IA. (PRE-RIG) PUMPED DOWN THE IA TAKING RETURNS TO THE
FLOWLINE; 5 BBL NEAT MEOH SPEAR, 367 BBLS SEAWATER, 5 BBLS MEOH, 105 BBLS DIESEL. U-TUBE
TO FREEZE PROTECT. BLEED DOWN TUBING & IA. FREEZE PROTECT FLOWLINE WITH 15 BBLS NEAT
MEOH. FINAL WHP'S=O/O/O.
Printp('' 12/79/70n3 9·d7·07 AM
.
Legal Name: W-205
Common Name: W-205
Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surfåce Pressure Leak ÖffPressure (BHP) EMW
8/26/2003 LOT (ft) (ft) (ppg) (psi) (psi) (ppg)
8/27/2003 LOT 4,414.0 (ft) 3,190.0 (ft) 9.20 (ppg) 825 (psi) 2,350 (psi) 14.18 (ppg)
8/28/2003 LOT (ft) (ft) (ppg) (psi) (psi) (ppg)
8/26/2003 LOT 3,985.0 (ft) 3,190.0 (ft) 9.20 (ppg) 825 (psi) 2,350 (psi) 14.18 (Ppg).
9/5/2003 FIT 7,618.0 (ft) 5,184.0 (ft) 9.20 (ppg) 684 (pSi) 3,162 (psi) 11.74 (ppg)
12/21/2003 FIT 6,956.0 (ft) 5,031.0 (ft) 9.20 (ppg) 750 (psi) 3,154 (psi) 12.07 (ppg)
1
BP
Leak-Off TesfSummary
...,
..
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
From - To Hours Task Code NPT Phase
12/1012003 03:00 - 05:30 2.50 MOB P PRE
05:30 - 07:00 1.50 MOB P PRE
07:00 - 10:30 3.50 MOB P PRE
10:30 - 14:00 3.50 RIGU P PRE
14:00 - 16:00 2.00 RIGU P PRE
16:00 - 21:30 5.50 RIGU P PRE
21 :30 - 22:30 1.00 WHSUR P DECOMP
22:30 - 23:30 1.00 WHSUR P DECOMP
23:30 - 00:00 0.50 WHSUR P DECOMP
12/11/2003 00:00 - 01 :30 1.50 WHSUR P DECOMP
01 :30 - 02:00 0.50 WHSUR P DECOMP
02:00 - 02:30 0.50 WHSUR P DECOMP
02:30 - 05:00 2.50 WHSUR P DECOMP
05:00 - 07:30 2.50 BOPSUFP DECOMP
07:30 - 08:00 0.50 BOPSUR P DECOMP
08:00 - 12:00 4.00 BOPSUR.P DECOMP
12:00 - 12:30 0.50 BOPSUFP DECOMP
12:30 - 13:30 1.00 BOPSUR.P DECOMP
13:30 - 14:30 1.00 PULL P DECOMP
14:30 - 16:30 2.00 PULL P DECOMP
Start:
Rig Release:
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
12/10/2003
12/28/2003
Description of Operations
Release rig from V-202 at 03:00 hrs on 12-10-03. Held PJSM
with Rig Crew & Peak. Move camp, mud pits and shop to W
Pad. RID Drill Floor. Move rig off V-202 well.
Lower Cattle chute. Lay down 9ES derrick & prepare sub-base
for rig move.
Move rig off V-Pad location onto Spine road. Rig in transit,
arrived on W-Pad @ 10:30 hrs with no problems.
Lay mat's & herculite. Move rig's sub base & spot over W-205,
level rig. Spot pit module & cuttings tank. Spot camp.
PJSM. Raise derrick. Hook-up power,water, steam and mud
lines.
Accept Rig at 16:00 hrs on December 10, 2003.
Take on seawater in pits. RlU cellar & rig floor. Load 4" DP in
pipe shed.
RIU circulating lines from rig floor to Production Tree for
reversing out diesel freeze protection from 4.5" tubing & 4.5" x
7-5/8" annulus.
RlU DSM Lubricator. Pull BPV from tubing hanger. UD DSM
lubricator. Pressure on well reading 0 psi.
SAFETY- Held PJSM with rig crew & service personnel
regarding the displacement of the diesel freeze protect &
decompletion of well.
Purge HP circulating lines from rig to production tree with
seawater. Test to 3500 psi. Line up to reverse out. All returns
routed through CIK manifold. Pump 50 bbl seawater @ 4.75
bpm w/ 575 psi down 4.5" x 7-5/8" annulus taking diesel returns
& contaminated fluid to cuttings tank. Stop pumping & line up
to pump down the 4.5" tubing. Pump 117 bbl down tubing @
4.75 bpm wI 200 psi. Recover 63 bbl diesel & 50 bbl
contaminated fluid. Monitor well. Well static.
Blow down all circulating lines & CIK manifold. RID 2" HP hose
coming off Flare line to cuttings tank. Secure Flare line outlet
with bull plug.
Install TWCV in 4.5" tubing hanger. Test from below to 1000
psi.
PJSM. N/D CIW 4-1/16" 5m Production Tree & adapter flange.
Inspect TCII threads in hanger-OK.
NIU 13-5/8" 5m BOP stack & related equipment.
M/U cross-over sub on 4" DP test joint. Screw into tubing
hanger. RIU to test BOP.
Test BOPE to 250 psi Low I 3500 psi High, Annular 250 psi
Low I 3500 psi High. Witnessed of test waived by Chuck
Scheve, AOGCC.
RID BOP test equipment. Blow down TDS & all surface lines.
RlU DSM lubricator & pull TWCV. RID same. FMC back out
lock down screws on 11" tubing spool.
RIU to pull 4.5" Tubing string. MIU TDS into 4.5" Tubing
Landing Joint. Pull 11 " x 4.5" tubing hanger free with 106k, pull
hanger above rotary table. Monitor well. No flow, well static.
Break circulation & stage up pumps slowly to 5.8 bpm w/1 00
psi. No gas or oil observed coming from well while circulating.
Circulated a total of 253 bbl. Flow check. Well static. Pump
slug.
Printed: 12/2912003 9:47:18AM
.
.
Opera
BP
S Summary Report
Page 2 of. 13
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
12/1112003 16:30 - 23:30 7.00 PULL P DECOMP POOH. UD 11" x 4.5" tubing hanger, 152 Joints of 4.5" 12.6#
L-80 IBT-M tubing & related completion jewelry. 100% recovery
of all items.
23:30 - 00:00 0.50 PULL P DECOMP RID tubing handling equipment. Clean up rig floor.
12/12/2003 00:00 - 01 :00 1.00 PULL P DECOMP Clear & clean Rig Floor.
01 :00 - 02:00 1.00 BOPSUR P DECOMP RlU & test Lower pipe rams (2-7/8" x 5" VBR) TO 25013500
PSI. Witness of test waived by Chuck Scheve-AOGCC. RID
test equipment. Run & install wear bushing.
02:00 - 02:30 0.50 CLEAN P DECOMP Place BOT mills on rig floor. Load Pipe Shed with MWD &
other BHA componets.
02:30 - 04:00 1.50 CLEAN P DECOMP Slip & cut 40' of drill line. Re-set & test C-O-M. Service TDS.
04:00 - 04:15 0.25 CLEAN P DECOMP PIU 9 joints of 4" DP & rack in derrick.
04:15 - 04:30 0.25 CLEAN P DECOMP SAFETY- Held PJSM with Rig Crew, Baker & Schlumberger
Service personnel on picking up clean out BHA.
04:30 - 06:30 2.00 CLEAN P DECOMP MIU 6-3/4" Mill assembly. Shallow test MWD. Take on 9.2#
MOBM while M/U BHA.
06:30 -13:00 6.50 CLEAN P DECOMP TIH with 6-3/4" Mill assembly picking up 4" DP from pipe shed.
Tag-up @ 7523'. P/U 140k SIO 101k
13:00 -14:00 1.00 CLEAN P DECOMP Pump HV sweep & circulate hole clean with seawater from
7523' w/270 gpm @ 900 psi. Reciprocate drill string while
circulating.
14:00 - 15:30 1.50 CLEAN P DECOMP Pump spacer. Displace hole with 9.2 ppg MOBM @ 275 gpm
wI 1640 psi FCP. Reciprocate drill string once MOBM reached
bit.
15:30 - 16:30 1.00 CLEAN P DECOMP POOH to 6695'.
16:30 - 21 :00 4.50 EVAL P DECOMP MIU TDS. Break circulation. Circulate & logging down with
MWD-GR from 6750' to 7500' to comfirm RA Tag positions for
calculating space-out requirements for whipstock. ( Circ rate
270 gpm w/1600 psi).
21 :00 - 00:00 3.00 CLEAN P DECOMP Flow Check-OK. Pump slug. POOH for Whipstock.
P/U = 135k S/O = 95k Rot = 113k Torque = 5400 FtLb
12/13/2003 00:00 - 00:30 0.50 CLEAN P DECOMP Finish POOH with 4" DP to BHA.
00:30 - 02:00 1.50 CLEAN P DECOMP POOH with 4" HWDP & 4-3/4" DC. UD 6.75" Mills & MWD tool.
02:00 - 03:00 1.00 CLEAN P DECOMP P/U 4.5" Memory Pressure gauge. Break connections on pup jt
& LID same.
03:00 - 03:15 0.25 STWHIP P WEXIT SAFETY- Held PJSM with Rig Crew & Service company
personnel regarding whipstock handling & running procedures.
03:15 - 05:30 2.25 STWHIP P WEXIT MIU Baker 7-518" Whipstock assembly #1. Orient MWD with
whipstock.
05:30 -10:00 4.50 STWHIP P WEXIT TIH with 7-5/8" Whipstock assembly on 4" DP to7460'.
PIU = 140k SIO = 95k
10:00 -11:00 1.00 STWHIP P WEXIT M/U TDS. Estabish circulation. Orient whipstock 15 deg LHS.
Stab dummy seal assembly into tie-back sleeve @ 7523'. Set
down 20 k to set whipstock anchor. PU 5k over to verify anchor
set. Set down 40k to shear whipstock lug. Test 7-5/8" casing
to 1000 psi for 10 minutes-OK.
11 :00 - 14:30 3.50 STWHIP P WEXIT Mill Window in 7-518" casing from 7173' to 7185' and d~3' of
new hole to 7197'.
RPM = 120
Torque = 5-7k FtLb
GPM = 270 @ 1840 psi
Printed: 1212912003 9:47:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
...
..
Page 3 of 13
BP
Operations Summary Report .
W-205
W-205
REENTER+cOMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
From - To Hours
Description of Operations
12/1312003 11 :00 - 14:30
14:30 - 16:00
16:00 - 16:30
16:30 - 19:00
19:00 - 20:30
20:30 - 21 :00
21:00 - 21 :30
21:30 - 21:45
21 :45 - 23:30
23:30 - 00:00
12/1412003 00:00 - 02:30
02:30 - 04:00
04:00 - 05:00
05:00 - 05:30
05:30 - 00:00
12/1512003 00:00 - 11 :00
3.50 STWHIP P
1.50 STWHIP P
WEXIT
WEXIT
0.50 STWHIP P
WEXIT
2.50 STWHIP P
1.50 STWHIP P
0.50 STWHIP P
0.50 STWHIP P
0.25 DRILL P
WEXIT
WEXIT
WEXIT
WEXIT
PROD1
1.75 DRILL P
0.50 DRILL P
2.50 DRILL P
PROD1
PROD1
PROD1
1.50 DRILL P
1.00 DRILL P
PROD1
PROD1
0.50 DRILL P
PROD1
18.50 DRILL P
PROD1
Rotate Wt = 113k
Pump hi-vis sweep. Circulate hole clean with 350 gpm @ 2175
psi. Work Mills through Window with pumps, then withouts
pumps. Window clean & clear.
Perform FIT. Pressure up on formation to 760 psi with 9.2 ppg
MOBM @ 5116' TVD = 12.0 ppg EMW. Pumped 1.2 bbl mud.
Bleed-back volume = 1 bbl. Flow check. Well static. Pump slug
POOH with 4" DP to top of BHA.
Continue POOH with BHA. LID MWD & Milling assembly.
Clean rig floor.
MIU ported sub. Flush out BOP's. UD sub.
SAFETY- Held PJSM with Anadrill and all rig personnel
regarding picking up BHA & loading RA source.
MIU 6-3/4" Steerable Drilling assembly. Test MWD-0K.
TIH with 6-3/4" BHA picking up 4" DP from pipe shed.
Continue TIH with 6.750" Steerable Drilling assembly picking
up 4" DP (108 Jts) to 4095'.
Finish TIH with 4" DP from derrick to 7150'.
M/U TDS. Establish circulation. Circulate bottoms-up w/250
gpm @ 2525 psi. PIU = 130k S/O = 98k.
Take SPR's & take ECD benchmark reading. Had 10.56 ppg
ECD @ 250 GPM + 60 RPM.
Stop pumps. Slack-off to 7188'. Stage pumps to 250 gpm.
Wash down through undergauge hole F/7188'-7197'.
Drill 6-3/4" directional hole from 7197' to 8568'. Slide as
required to maintain inclination & azimuth. Take survey every
30'.
WOB = 5-15k
RPM = 60
Torque off Btm = 6.7k FtLb, Torque on Btm = 9k FtLb
GPM = 275 @ 3100 psi on Btm w/100-300 psi Diff Pressure.
PIU 135k S/O 81k ROT 108k
Backream every stand at 275 gpm and 60 rpm, reducing flow
rate to 225 gpm on down stroke.
Calculated ECD @ 8568' = 10.5, Actual ECD = 11.3
NOTE: The AIM tool failed at 7822'.
Landed wellbore into Obc sand @ 7310' MD/5131, KBTVD. At
8052' came out the bottom of Obc Lower sand. Build to 94 deg.
Regain Obc contact @ 8190', Then drilled out the top of zone
@ 8290'. Rotate & slide as required. Regained Obc contact @
8400'.
ART = 3.17 Hrs AST = 6.03 Hrs Survey/Connection = 9.30
Hrs
Drilling Time last 24 Hrs= 9.20 hrs
11.00 DRILL P
PROD1 Drill 6-3/4" directional hole from 8568' to 9284'. Slide as
required to maintain inclination & azimuth. Take survey every
30'.
Printed: 12/2912003 9:47:18 AM
~
-
BP
Operations Summary Report
Page4of13
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+cOMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
Date From - To Hours Task Code NPT Phase Description of Operations
12/15/2003 00:00 - 11 :00 11.00 DRILL P PROD1 WOB = 15-20k
RPM = 60
Torque off Btm = 6k FtLb, Torque on Btm = 10k FtLb
GPM = 275 @ 3100 psi on Btm wI 100-300 psi Diff Pressure.
P/U 158k SIO 62k ROT 109k
Backream every stand at 275 gpm and 60 rpm, reducing flow
rate to 225 gpm on down stroke.
Calculated ECD @ 9284' = 10.62, Actual ECD = 11.11
ART = 3.9 Hrs AST = 2.35 Hrs SurveylConnection = 4.75
Hrs
Drilling Time last 24 Hrs= 6.25 hrs
11:00-13:30 2.50 DRILL N DFAL PROD1 Note: Due to a unaccceptable amount of pay zone drilled in the
L 1 lateral a decision was made by BP Drilling department to
perform a Open Hole sidetrack at +/-8200' MD. Pump HV
Sweep & circulate hole clean (3.8 x Btm-up vol) from 9284'
with 300 gpm @ 3170 psi. Reciprocate & rotate drill string (80
RPM) while circulating. ECD after circulating: Calculated ECD
= 10.62 Actual ECD = 10.68. P/U 142k SIO 85k
13:30 - 19:00 5.50 DRILL N DFAL PROD1 POOH. Encountered intermittent tight hole from 8755' to 8000'.
Passed through window @ 7173' with no problems. Continue
POOH to top of BHA.
19:00 - 19:15 0.25 DRILL N DFAL PROD1 SAFETY- Held PJSM with Rig Crew & SWS personnel
regarding UD BHA & unloading RA sourse.
19:15 - 20:30 1.25 DRILL N DFAL PROD1 POOH. Stand back Jars. Unload RA sourse. UD BHA #3.
20:30 - 21 :00 0.50 DRILL N DFAL PROD1 Clean Rig Floor of excess MOBM generated from trip.
21:00 - 22:30 1.50 DRILL N DFAL PROD1 MlU New 6-3/4" Security FM3643 PDC Bit & BHA #4 (Note:
BHA #4 consist of all fresh tools ). AIM-MWD-VPWD-ADN.
Orient MWD. PJSM. Load RA source.
22:30 - 23:00 0.50 DRILL N DFAL PROD1 TIH to 1100'. Shallow test MWD. MWD Tool transmitting
incorrect survey data. Trouble shoot problem. Unable to rectify
problem.
23:00 - 00:00 1.00 DRILL N DFAL PROD1 POOH from 1100' to change out MWD tool.
12/1612003 00:00 - 01 :00 1.00 DRILL N DFAL PROD1 MWD Tool failure- POOH to BHA. PJSM. Download RA
sourse. Change out MWD tools.
01:00 - 02:30 1.50 DRILL N DFAL PROD1 MlU BHA #5. Orient MWD to Mud-motor. Load RA sourse. TIH
to 735'. Shallow test MWD-OK.
02:30 - 04:30 2.00 DRILL N DFAL PROD1 Continue TIH with 6-3/4" Steerable Drilling asembly on 4" DP to
6800'.
04:30 - 06:30 2.00 DRILL N DFAL PROD1 Slip & cut 30' of drill line. Reset & check C-O-M. Checks
Brakes. Service TDS.
06:30 - 07:30 1.00 DRILL N DFAL PROD1 TIH to 7100'. Establish circulation. CBU. Orient Bit to 14 deg
LHS.
07:30 - 08:30 1.00 DRILL N DFAL PROD1 Stop pumps. Slack off & pass through window with no
problems. TIH to 8100'.
08:30 - 12:00 3.50 DRILL N DFAL PROD1 Break circulation. Stage pumps to 275 gpm wI 2700 psi. Orient
TF to low side for Open Hole Sidetrack. Wash down to 8180'.
Start trenching from 8180'-8200'.
12:00 - 00:00 12.00 DRILL N DPRB PROD1 Drill 6-314" directional hole (L 1-ST #01) from 8200' to 9098'.
Slide as required to maintain inclination, azimuth & pay zone
Printed: 1212912003 9:47:18 AM
.,
..
"-.. ,''''
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+cOMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
Date Ff'om - To . Hours Task Code NPT Phase Description of Operations
12/1612003 12:00 - 00:00 12.00 DRILL N DPRB PROD1 contact. Take survey every 30'.
WOB = 15-20k
RPM = 60
Torque off Btm = 6.9k FtLb, Torque on Btm = 9.3k FtLb
GPM = 275@ 3150 psi on Btm wI 100-300 psi Diff Pressure.
P/U 148k SIO 77k ROT 105k
Backream every stand at 275 gpm and 60 rpm, reducing flow
rate to 225 gpm on down stroke.
Calculated ECD @ 9098' = 10.50, Actual ECD = 11.05
ART = 3.25 Hrs AST = 5.05 Hrs SurveylConnection = 4.7
Hrs
Drilling Time last 24 Hrs= 8.30 hrs
12/1712003 00:00 - 02:30 2.50 DRILL N DPRB PROD1 Drill 6-3/4" directional hole (L 1-ST #01) from 9098' to 9284'.
Slide as required to maintain inclination, azimuth & pay zone
contact. Take survey every 30'.
02:30 - 18:00 15.50 DRILL P PROD1 Drill 6-3/4" directional hole (L 1-ST #01) from 9284' to 10680'
TD. Slide as required to maintain inclination, azimuth & pay
zone contact. Take survey every 30'.
WOB = 15-20k
RPM = 60
Torque off Btm = 10k FtLb, Torque on Btm = 12k FtLb
GPM = 275 @ 3150 psi on Btm w/100-300 psi Diff Pressure.
PIU 148k S/O 78k ROT 105k
Backream every stand at 275 gpm and 40-60 rpm, reducing
flow rate to 225 gpm on down stroke.
Calculated ECD @ 10530 ' = 10.64 , Max ECD = 11.40
ART = 4.34 Hrs AST = 3.36 Hrs Survey/Connection = 10.30
Hrs
Drilling Time last 24 Hrs= 7.70 hrs
18:00 - 21:30 3.50 DRILL P PROD1 Circulate & condition mudlhole (4 x Btm-up vol) from 10680'
with 295 gpm @ 3335 psi. Reciprocate & rotate drill string (80
RPM) while circulating.
Calculated ECD @ 10680' = 10.86 , Actual ECD = 11.25 prior
to trip
PIU 165k-No pump, SIO 82k-No pump
21 :30 - 00:00 2.50 DRILL P PROD1 POOH for wiper trip to 8451' (Midnight depth). Hole slick from
bottom up to 10385', encountered drag increase with
intermittent tight hole to from 10385' to 8451'. Tight spots seem
to correspond to slid intervals.
12/18/2003 00:00 - 01 :00 1.00 DRILL P PROD1 Continue POOH for wiper trip from 8451' to 7185'. Had normal
drag F/8451 '-8200'.
01 :00 - 03:30 2.50 DRILL P PROD1 Fill drill string. TIH to 8158'. Orient TF to LS. Continue TIH
entering L 1 ST #01 @ 8200'. Finish TIH to 10623' with no
problems.
03:30 - 07:30 4.00 DRILL P PROD1 Establish circulation. Precautionary wash to bottom @ 10680'
with no problems. Circulate bottoms-up with 250 gpm @ 2730
Printed: 1212912003 9:47:18 AM
p -
..
....
BP
Operations Summary Report
Page 6 of 13
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
Date From -To Hours Task Code NPT Phase Description of Operations
12/18/2003 03:30 - 07:30 4.00 DRILL P PROD1 psi + 80 RPM (Had a large volume of drill cuttings come over
shakers on Btm-up). Pump HV sweep. Circulate & condition
mudlhole (4 x Btm-up) with 300 gpm @ 3310 psi. Reciprocate
& rotate drill string (80 RPM w/9.4-10K Torq) while circulating.
P/U 150k SIO 76k with pumps
Calculated ECD @ 10680' = 10.80 , Actual ECD = 11.07
07:30 - 11 :00 3.50 DRILL P PROD1 Flow check. Well static. Pump slug. POOH to 7160' with no
problems.
11 :00 - 12:00 1.00 DRILL N RREP PROD1 Held PJSM. Change out air boot sealing element on
bell-nipple.
12:00 - 13:30 1.50 DRILL P PROD1 Break circulation. Stage pumps to 275 gpm. Orient TF to 14
deg LHS. Stop pumping. Slide bit down past window & place
circulation sub at 7185'. Drop ball-rod. Break circulation. Open
circ sub with 2300 psi. Stage pumps to 550 gpm with 3470 psi.
Wash whipstock face 10 minutes. Pull circ sub above
whipstock. Pump HV sweep. Circulate hole clean from 7160'
with 550 gpm @ 3470 psi.
13:30 - 16:30 3.00 DRILL P PROD1 Flow check. Well static. Pump slug. POOH to BHA.
16:30 - 16:45 0.25 DRILL P PROD1 SAFETY- Held PJSM with rig crew & SWS personnel on
removing RA sourse & UD BHA.
16:45 - 18:00 1.25 DRILL P PROD1 Remove RA sourse from ADN tool. UD BHA.
18:00 - 18:30 0.50 DRILL P PROD1 Clean rig floor & removing excess directional equipment.
18:30 - 19:00 0.50 STWHIP P PROD1 SAFETY- Held PJSM with rig crew, SWS & Baker personnel
regarding MIU Whipstock retrieving tool (WSRT) & BHA.
19:00 - 20:00 1.00 STWHIP P PROD1 MIU L 1 WSRT & BHA. Shallow test MWD-OK.
20:00 - 22:30 2.50 STWHIP P PROD1 TIH with WSRT & BHA on 4" DP to 7100'.
22:30 - 23:00 0.50 STWHIP P PROD1 Break circulation. Stage pumps to 255 gpm w/1470 psi. Orient
WSRT to 14 deg LHS. PIU Wt 150k SIO Wt 95k. Slack off
on drill string to 7177'. PIU & engage Whipstock. Pull &
release whipstock with 200k string weight. PIU another 40k to
pull seals out of bottom tie-back receptacle. Pull whipstock up
to 7149'. Monitor well-static.
23:00 - 00:00 1.00 STWHIP P PROD1 Circulate bottoms up from 7149'. Flow check. Well static.
Pump slug.
12/19/2003 00:00 - 03:30 3.50 STWHIP P PROD1 POOH with 4" DP to BHA.
03:30 - 06:30 3.00 STWHIP P PROD1 Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock
retrieving tool, L 1 Whipstock & 3.5" DP space-out assembly.
100% recovery of all Whipstock & downhole tools. Clear &
clean rig floor.
06:30 - 07:00 0.50 BOPSUr;,P PROD1 MIU Ported sub on 4" DP. RIH & flush BOP stack. Pull wear
bushing
07:00 - 11 :30 4.50 BOPSUR P PROD1 RlU to test BOP's with 4" DP. Set test plug. Test BOP's & all
surface related equipment to 250/3500 psi. RID test
equipment. All test were API. Witness of test waived by Lou
Grimaldi-AOGCC.
11:30 - 12:30 1.00 CASE P LNR1 RIU to run 4.5" Slotted liner.
12:30 - 12:45 0.25 CASE P LNR1 SAFETY- Held PJSM with rig crew & BOT personnel
regarding running liner & PIU Hook Hanger assembly.
12:45 - 16:30 3.75 CASE P LNR1 MIU 4-1/2" Float Shoe (Bent) Jt + 82 Jts of 4-1/2" 12.6#, L-80,
IBT-M slotted liner & BOT Flanged Hook Hanger assembly.
Total length = 3471.72'
P/U Wt = 75k SIO Wt = 68k
16:30 - 17:00 0.50 CASE P LNR1 RID 4.5" Liner running equipment. Install DP elevators on TDS.
Printed: 12/29/2003 9:47:18 AM
,...
-
BP
Operations Summary Report
Page 7 of 13
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
Date From - To Hours Task Code NPT Phase Description of Operations
12/1912003 17:00 - 19:00 2.00 CASE P LNR1 TIH with 4-1/2" 12.6# Slotted liner assembly on 4" DP to 7120'.
PIU Wt = 124k SIO Wt = 85k
19:00 -19:30 0.50 CASE P LNR1 M/U TDS. Establish circulation. Circulate one drill pipe volume
wI 166 gpm @ 575 psi. Slack oft on drill string with EOT @
7170'. Rotate string @ 5 rpm. RIH slowly to 7173', observed
torque increase. Stop rotating.
19:30 - 20:00 0.50 CASE P LNR1 Continue TIH. Tag up on lower Tie-back sleeve @ 7530'.
POOH to 7120' (Attempt #1).
20:00 - 20:45 0.75 CASE P LNR1 Apply 1/4 turn RHT in string. TIH. Tag up @ 7530'. POOH to
7120' (Attempt #2).
20:45 - 21 :30 0.75 CASE P LNR1 Apply 1/4 turn RHT in string. TIH. Tag up @ 7530'. POOH to
7120' (Attempt #3).
21 :30 - 22:00 0.50 CASE P LNR1 Apply 1/4 turn RHT in string. TIH. Tag up @ 7530'. POOH to
7120' (Attempt #4).
22:00 - 00:00 2.00 CASE P LNR1 Apply 1/4 turn RHT in string. TIH with the 4-1/2" liner
sucessfully entering the L 1 lateral @ 7185'. Continue TIH to
8050'. Apply 1/2 turn RHT in string. TIH. Enter L 1 ST #01
lateral @ 8200'. Continue TIH with 4-1/2" Slotted liner on 4" DP
to 9350' (Midnight depth).
1212012003 00:00 - 01 :00 1.00 CASE P LNR1 Continue TIH with 4-1/2" Slotted liner on 4" DP in the L 1 ST
#01 lateral from 9350' to 10565'.
P/U Wt = 165k SIO wt = 80k
01 :00 - 02:00 1.00 CASE P LNR1 M/U TDS into 4" DP. Slack oft slowly to put shoe at 10640'. Set
down 20k on Hook Hanger. Verify Hook Hanger properly
engaged in the window - OK. Drop 29/32" ball & pump on seat.
Pressure up to 3000 psi to release HR-running tool. Continue
pressuring up to 4500 psi & shear ball seat. PIU Drill string &
verify HR-running tool released. Lost 25k string wt. Continue
picking up on string & place HR-running tool @ 7120' (48'
above Hook Hanger @ 7168').
02:00 - 03:00 1.00 CASE P LNR1 Circulate bottoms up from 7120' w/210 gpm @ 670 psi. Flow
check. Well static. Pump slug. Blow down TDS.
03:00 - 04:00 1.00 CASE P LNR1 POOH with 4" DP to 4730'.
Note: A glob of hydraulic slush rained out of the derrick & hit a
crew member in the back of the neck. The crew member was
not injured and declined visiting the PA for examination.
04:00 - 04:30 0.50 CASE P LNR1 SAFETY-Shut down tripping operations. Perform inspections
on TDS service loops & derrick. No damaged equipment
observed but the TDS Hydraulic service loop had a developed
a twist which could cause it to hang up in the derrick.
04:30 - 09:30 5.00 CASE N LNR1 Change out TDS hydraulic service loop.
09:30 - 12:00 2.50 CASE P LNR1 Finish POOH. UD Baker's Hook Hanger HR-Running tool.
Clear rig floor of excess equipment.
12:00 - 12:15 0.25 CASE P TIEB1 SAFETY- Held PJSM with Rig Crew & BOT service personnel
on picking up & running the ZXP-LEM assembly.
12:15 -13:30 1.25 CASE P TIEB1 MIU and run mule shoe Jt + 7 Jts of 4-1/2", 12.6#, L-80 tubing
(Tail pipe to tie back into OBd Liner top packer @ 7524'). MIU
LEM and ZXP Packer assembly. Total length = 400.14'. RID
Tubing handling equipment.
PIU 46k S/O 45k
13:30 -19:30 6.00 CASE P TIEB1 TIH with 4.5" tail-pipe + LEM-ZXP packer assembly on 4" DP to
7485'. Passed through Hook Hanger@ 7168' with no
Printed: 12129/2003 9:47:18 AM
.
.
BP
Operations Summary Report
Page 80t 13
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+cOMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
pate From -To Hours Task Code NPT Phase Description of Operations
12/20/2003 13:30·19:30 6.00 CASE P TIEB1 problems.
PIU Wt = 143k SIO Wt = 98k
19:30 . 20:30 1.00 CASE P TIEB1 Slack off on work string with the 4.5" mule shoe entering the
lower tie back sleeve at 7524' with no problems. Continue
slacking off on string to set the LEM into the hook hanger collet
@ 7168' with the 4.5" mule shoe at 7535'. Land LEM with 30k.
P/U 10k to verify set, then slack off 20k & park pipe. Drop the
29/32" setting ball and pump onto seat. Pressure up to 3300
psi to set ZXP packer. Continue pressuring up to blow ball
seat, ball seat sheared at 4750 psi. P/U 10', verify packer set.
Slack back down on packer with 5Ok. P/U with 15k on packer.
Rotate at 15 rpm for one minute with rotating dogs engaging
ZXP Tie back sleeve.
Note: Top of L 1 ZXP Tie-back sleeve @ 7135'
PIU 140k SIO 94k
20:30 - 22:00 1.50 CASE P TIEB1 PIU 20'. Circulate bottoms up with 300 gpm @ 1600 psi. Flow
check. Well static. Pump slug. Blow down TDS & surface
equipment.
22:00 - 00:00 2.00 CASE P TIEB1 POOH with 4" DP to 4000' (Midnight depth).
12121/2003 00:00 - 01 :30 1.50 CASE P TIEB1 Slip & cut 20' of drill line. Reset & test C-O-M. Service TDS &
rig.
01 :30 - 02:30 1.00 CASE P TIEB1 Finish POOH. LID ZXP packer running tool. Clean rig floor.
02:30 - 02:45 0.25 STWHIP P WEXIT SAFETY- Held PJSM with rig crew & BOT Service Rep on
picking up & running Whipstock.
02:45 - 05:30 2.75 STWHIP P WEXIT M/U Baker 7-5/8" (L2) Whipstock assembly. Orient MWD with
whipstock. Finish M/U BHA. Shallow test MWD-OK.
05:30 - 08:00 2.50 STWHIP P WEXIT TIH with 7-5/8" (L2) Whipstock assembly on 4" DP to
6837'-whipstock depth.
P/U Wt = 145k SIO Wt = 90k
08:00 - 08:30 0.50 STWHIP P WEXIT M/U TDS. Estabish circulation. Orient whipstock 13 deg LHS.
Stab dummy seal assembly into (L1) tie-back sleeve @ 7135'.
Set down 20 k to set whipstock anchor. PU 5k over to verify
anchor set. Set down 40k to shear whipstock lug. Top of
whipstock @ 6930'.
08:30 - 09:30 1.00 STWHIP P WEXIT Circulate bottoms-up from 6930' w/250 gpm @ 1365 psi. Test
7-518" casing to 1000 psi for 10 minutes-QK.
09:30 -13:00 3.50 STWHIP P WEXIT Mill Window in 7-5/8" casing from 6930' to 6942' and drill 14' of
new hole in the L2lateral to 6956'.
WOB = 4-7k
RPM = 110
Torque = 5-7k FtLb
GPM = 275 @ 1700 psi
Rotate wt = 113k
13:00 - 14:00 1.00 STWHIP P WEXIT Pump a 50 bbl Hi-vis sweep. Circulate hole clean FI 6956' with
275 gpm @ 1700 psi (Circ 2 x Btm-up). Work Mills through
Window with pumps, then withouts pumps. Window clean &
clear.
14:00 - 14:30 0.50 STWHIP P WEXIT Perform FIT. Pressure up on formation to 750 psi with 9.2 ppg
MOBM @ 5031'lVD = 12.07 ppg EMW. Pumped 0.9 bbl mud.
Flow check. Well static. Take SPR's. Pump slug.
Printed: 12/2912003 9:47:18 AM
..,
..
BP
Operations Summary Report
Page 9 of 13
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
Date From - To Hours Task Code NPT Phase Description of Operations
12/2112003 14:30 - 18:00 3.50 STWHIP P WEXIT POOH with 4" DP to top of BHA.
18:00 - 19:30 1.50 STWHIP P WEXIT Continue POOH with BHA. UD MWD & Milling assembly.
Clean & clear Rig Floor.
19:30 - 20:00 0.50 STWHIP P WEXIT MIU ported sub. Flush out BOP's. UD sub.
20:00 - 20:15 0.25 DRILL P WEXIT SAFETY- Held PJSM with Anadrill and all rig personnel
regarding picking up BHA & loading RA source.
20:15-21:30 1.25 DRILL P WEXIT M/U 6-314" Steerable Drilling assembly. Test MWD-OK.
21 :30 - 00:00 2.50 DRILL P WEXIT TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 4300'.
12/22/2003 00:00 - 01 :00 1.00 DRILL P WEXIT Finish TIH with 6-3/4" Steerable Drilling asembly on 4" DP F/
4300' to 6890'.
01 :00 - 02:00 1.00 DRILL P WEXIT MIU TDS. Establish circulation. Circulate bottoms-up
w/190-250 gpm @ 1300-1975 psi.
PIU = 133k S/O = 95k.
Take SPR's & take ECD benchmark reading. Had 10.36 ppg
ECD @ 250 GPM + 60 RPM.
02:00 - 02:30 0.50 DRILL P WEXIT Stop pumps. Slack-off passing through 7-5/8" window
(6930'-6942') with no problems. Tag up @ 6950'. Stage pumps
to 250 gpm. Wash & ream down through undergauge hole FI
6950' to 6956'.
02:30 - 00:00 21.50 DRILL P PROD2 Drill 6-3/4" directional hole in the L2 lateral from 6956' to 8786'.
Slide as required to maintain inclination & azimuth. Take
survey every 30'.
WOB = 10-20k
RPM = 60
Torque off Btm = 6k FtLb, Torque on Btm = 10k FtLb
GPM = 275 @ 2800 psi on Btm w/100-120 psi Diff Pressure.
P/U 146k S/O 82k ROT 109k
Backream every stand at 250 gpm and 60 rpm, reducing flow
rate to 225 gpm on down stroke.
Calculated ECD @ 8786' = 10.50 ppg, Actual ECD = 10.85 ppg
Landed wellbore into Oba sand @ 6967' MD/5044' KBTVD.
ART = 2.46 Hrs AST = 8.09 Hrs Survey/Connection = 10.95
Hrs
Drilling Time last 24 Hrs= 10.55 hrs
12/23/2003 00:00 - 20:30 20.50 DRILL P PROD2 Drill 6-3/4" directional hole in the L2 lateral from 8786' to TD at
10670'. Slide as required to maintain inclination & azimuth.
Take survey every 30'.
WOB = 10-15k
RPM = 60
Torque offBtm = 9.5k FtLb, Torque on Btm = 10-11k FtLb
GPM = 275 @ 3000 psi on Btm w/100-120 psi Diff Pressure.
P/U 146k SIO 78k ROT 109k
Backream every stand at 250 gpm and 60 rpm, reducing flow
rate to 225 gpm on down stroke.
Calculated ECD @ 10670' = 10.53 ppg. Actual ECD = 10.97
ppg
Printed: 12129/2003 9:47:18 AM
.
.
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+cOMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Page 100113
Start:
Rig Release:
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
12/10/2003
12/28/2003
Code NPT
Description of Operations
12/23/2003 00:00 - 20:30
20.50 DRILL P
PROD2
ART = 7.01 Hrs.
AST = 3.34 Hrs.
Drilling Time last 24 Hrs= 10.35 hrs
PROD2 Circulate & condition mudlhole (2.5 x Btm-up vol) from 10670'
with 300 gpm @ 3200 psi. Reciprocate & rotate drill string (80
RPM) while circulating.
20:30 - 22:30
2.00 DRILL P
22:30 - 00:00
1.50 DRILL P
Calculated ECD @ 10670' = 10.68, Actual ECD = 10.90 prior to
trip
PROD2 Monitor well - static. POH for wiper trip to window. Pull 5
stands, slug DP and continue POH. Pulled 5-1 Ok over string
weight off bottom.
12/2412003 00:00 - 01 :00
1.00 DRILL P
PIU 160k 5/088k No Pumps
PROD2 Continue short trip. intermittent drag of 5-15k throughout trip.
Pulled 25k over at 7965',7923',7645', wipe through without
any problems.
P/U 163k SIO 84k
PROD2 Monitor well - static. Pump out from 7075' to 6982'. 275 gpm @
2388 psi.
PROD2 RIH to 10580'. No problems on trip in.
PROD2 Wash last stand to TD at 10670'. Circulate & condition
mudlhole (2 x Btm-up vol) from 10670' with 275 gpm @ 2940
psi. Reciprocate & rotate drill string (80 RPM) while circulating.
Calculated ECD @ 10670' = 10.68, Actual ECD = 10.90 prior to
POH
PROD2 Monitor well- static. POH to 7167'. Orient to 13 degrees left.
Continue POH to 6889, bringing BHA and bit inside casing.
RIH placing circ sub at the base of the whipstock.
PROD2 Drop ball and rod and pump onto seat, circ sub sheared at
2100 psi. Circulate across whipstock face to clean retrieval
slot. 500 gpm at 3000 psi. Stand back 3 stands bringing bit
inside of casing at 6889'. Pump hi-vis sweep. 500 gpm at 3000
psi while reciprocating DP at 60 rpm.
Continue POH
01 :00 - 01 :30
0.50 DRILL P
01 :30 - 02:30
02:30 - 04:30
1.00 DRILL P
2.00 DRILL P
04:30 - 07:00
2.50 DRILL P
07:00 - 08:00
1.00 DRILL P
08:00 - 11 :30 3.50 DRILL P PROD2
11 :30 - 12:00 0.50 DRILL P PROD2
12:00 -13:00 1.00 DRILL P PROD2
13:00-13:30 0.50 DRILL P PROD2
13:30 - 14:00 0.50 SiWHIP P PROD2
14:00 - 15:00 1.00 SiWHIP P PROD2
15:00 - 17:00 2.00 5iWHIP P PROD2
17:00 -17:30 0.50 SiWHIP P PROD2
P/U 145k S/O 93k
PJSM with Anadril and all rig personnel on unloading RA
source and laying down BHA.
LD BHA #7
Clean and clear rig floor
PJSM with Baker, Anadril and all rig personnel on making up
whipstock retrieval BHA.
MU whipstock retrieving tool and BHA, orient. RIH with collars
and HDP from derrick. Shallow test MWD.
RIH with DP to 6900'
Fill DP. Orient retrieving tool 13 degrees left. 135 klbs up, 95
klbs down. Slack off while circulatingto top of whipstock at
6930'. continue down putting retrieval tool below whipstock
face. PU and engage retrieval slot, jar 4 times to release
Printed: 1212912003 9:47:1BAM
~
..
of 13
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+cOMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Date Frôl'TÏ- To Hours Task
12/24/2003 17:00 -17:30 0.50 STWHIP P PROD2
17:30 - 18:30 1.00 STWHIP P PROD2
18:30 - 22:00 3.50 STWHIP P PROD2
22:00 - 00:00 2.00 STWHIP P PROD2
12/25/2003 00:00 - 00:30 0.50 STWHIP P PROD2
00:30 - 01 :00 0.50 CASE P LNR2
01 :00 - 01 :30 0.50 CASE P LNR2
01 :30 - 05:00 3.50 CASE P LNR2
05:00 - 05:30
05:30 - 08:00
0.50 CASE P
2.50 CASE P
LNR2
LNR2
08:00 - 08:15 0.25 CASE P LNR2
08:15 - 08:30 0.25 CASE P LNR2
08:30 - 08:45 0.25 CASE P LNR2
08:45 - 09:00 0.25 CASE P LNR2
09:00 - 13:15 4.25 CASE P LNR2
13:15 - 13:45 0.50 CASE P LNR2
13:45 - 14:15
0.50 CASE P
LNR2
14:15 - 15:00 0.75 CASE P LNR2
15:00 -16:00 1.00 CASE P LNR2
16:00 -19:30 3.50 CASE P LNR2
19:30 - 20:30 1.00 CASE P TIEB2
20:30 - 21:00 0.50 CASE P TIEB2
21 :00 - 22:00 1.00 CASE P TIEB2
22:00 - 00:00 2.00 CASE P TIEB2
12/26/2003 00:00 - 02:00 2.00 CASE P TIEB2
02:00 - 02:15 0.25 CASE P TIEB2
Start:
Rig Release:
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
12/10/2003
12/28/2003
Description of Operations
whipstock anchor. PU pulling seal assembly out of tie back
sleeve. PU 30', 7k increase in PU weight.
Monitor well - static. CBU, 300 gpm at 1900 psi.
Monitor well - static. Slug DP and POH with whipstock
PIU 150k
LD retrieving BHA and whipstock assembly.
Clean and clear rig floor.
RlU to run 4.5" slotted liner.
PJSM with rig crew & BOT personnel regarding running liner &
PU Hook Hanger assembly.
MIU 4-1/2" Float Shoe (Bent) Jt + 87 Jts of 4-1/2" 12.6#, L-80,
IBT-M slotted liner & BOT Flanged Hook Hanger ass'y. Total
length = 3708.83'
P/U Wt = 75k S/O Wt = 62k
RID 4.5" Liner running equipment. Install DP elevators on TDS.
RIH with 4-1/2" 12.6# Slotted liner assembly on 4" DP to 6936'.
Circ DP vol with liner shoe at window. Rotate 5 RPM @ window
looking for torque increase - saw slight increase as if window
hooked with bent shoe jt. RIH but tag up on liner top of L 1 at
7135'. Attempt #1.
POH above window and put 1/4 turn in pipe. Work turn down.
RIH looking for window. Tag up on L 1 liner top again. Attempt
#2.
POH above window and put next 1/4 turn in pipe. Work turn
down.
RIH looking for window. Exit window successfully into L2.
Attempt #3.
Continue RIH with liner on DP into open hole.
160 klbs up. 85 klbs down.
Engage hook hanger on bottom of window on first attempt.
PU 20' above and rotate string 1/2 turn. Run in and run hook
10' below btm of window - OK. Pull up, re-orient hook hanger
and re-engage bottom of window on second try - OK.
Shoe at 10631'. Top of hook hanger at 6925'.
Drop 29/32" ball in DP and circ down on seat at 4 then 2 bpm
with 1020 stks. Pressure up to 3200 psi to release from hook
hanger - OK. PU Wt = 135 klbs. Pressure up to 4500 psi with
mud pump then BOP test pump and shear out ball seat· OK.
PU 30' and CBU, 300 gpm at 1300 psi. Monitorwell- static.
Cut and slip 26' of drill line. Inspect brakes and drawworks.
Monitor well - static. slug DP and POH with liner running tool.
PIU Wt = 138k 5/0 Wt = 100k
RU liner running equipment.
PJSM with BOT and all rig personnel on MU and running ZXP
Packer and LEM assembly.
MU and run ZXP Packer and LEM assembly
Continue RIH with ZXP PackerlLEM assembly on DP. MU top
drive to each stand to prevent MOBM from running over.
Continue RIH with ZXP Packer/LEM assembly
Reduce running speed and pass mule shoe through hook
hanger assembly. Establish string weights; 138 klbs up, 95 klbs
Printed: 1212912003 9:47:18 AM
..,
..
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+cOMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
12/10/2003
12/28/2003
Description of Operations
From-To Task
12/26/2003 02:00 - 02:15 0.25 CASE P TIEB2
02:15 - 03:00 0.75 CASE P TIEB2
03:00 - 04:30 1.50 CASE N RREP TIEB2
04:30 - 05:00 0.50 CASE P TIEB2
05:00 - 05:30 0.50 CASE P TIEB2
05:30 - 07:30 2.00 CASE P TIEB2
07:30 - 08:00 0.50 CASE P TIEB2
08:00 - 09:30 1.50 CASE P TIEB2
09:30 - 17:30 8.00 CASE P TIEB2
17:30 - 20:30 3.00 CASE P TIEB2
20:30 - 22:00 1.50 CASE P TIEB2
22:00 - 00:00 2.00 CASE P TIEB2
12/2712003 00:00 - 03:00 3.00 CASE P TIEB2
03:00 - 04:00 1.00 CASE P TIEB2
04:00 - 04:30 0.50 RUNCOfIIN RREP COMP
04:30 - 12:30 8.00 RUNCOfIIN RREP COMP
12:30 -13:00 0.50 BOPSUF\P COMP
13:00 - 15:00 2.00 RUNCOMP COMP
15:00 - 15:30 0.50 RUNCOMP COMP
15:30 - 00:00 8.50 RUNCOMP COMP
12/28/2003 00:00 - 01 :00 1.00 RUNCOMP COMP
01 :00 - 02:30 1.50 RUNCOMP COMP
02:30 - 05:00 2.50 RUNCOMP COMP
05:00 - 06:30 1.50 RUNCOMP COMP
down. Continue RIH with mule shoe in tie-back sleeve and
engaging LEM in hook hanger. PU 10k over string weight
verifying LEM is engaged.
Drop ball and pump onto seat at 4 bpm, 839 psi. Pressure up
to 3000 with rig pump. RU test pump and continue pressuring
up to 3300 psi to set packer. Continue pressuring up to 4500
psi to blow ball seat.
Rotary hose failed at 4500 psi. The job was stopped a safety
assessment was conducted. The rotary hose was rigged down.
A head pin with TIW valve was rigged up on the DP.
Continue pressure up with the test pump to 5000 psi to blow
out ball seat.
Reciprocate 20' while circulating and conditioning mud for
displacement.
Displace well to 9.3 ppg brine.
Pumped the following sweeps:
20 bbls LVT-200 base oil
20 bbls viscosified 9.3 ppg brine
50 bbls 9.3 ppg brine with 4 drums Safe Surf 0
25 bbls viscosified 9.3 ppg brine
Follow the sweeps with 279 bbls 9.3 ppg brine until clean
returns. 430 gpm, 2020 psi.
Blow down and RD circulating lines.
Load MOBM on trucks. Clean MOBM from rotary table, sumps,
shakers and trough.
POH laying down DP
RIH with 4-3/4" DC's and 40 stands of DP from derrick
CBU to flush MOBM from DP. 420 gpm, 1265 psi.
Monitor well- static, Slug DP and POH laying down.
Continue POH laying down DP
Clean and clear rig floor of MOBM.
PJSM with rig personnel on installing new rotary hose.
Bring new rotary hose to the floor and install.
Pull wear bushing. Make dummy run with landing joint.
Change out bails and elevators. RU I-wire spooling unit and
completion equipment.
PJSM with Centrilift, Camco, Tubel, BOT and all rig personnel
on running completion with Phoenix and Tubel gauges, I-wire
and clamps.
Run 4-1/2",12.6#, L-80 completion and all associated jewelry
per running order.
Continue Run 4-1/2",12.6#, L-80, IBT-M completion. Ran 159
jts plus jewelry. PU spaceout joints.
Space out tbg string. MU spacer pup. Install 1 foot of blast
rings on pup jt below tubing hanger body and lock in place with
stop ring. LD spaceout jts. MU hanger and landing joint.
MU I-wire to tbg hanger. Install and test Tubel receiver. Test all
swagelok fittings to 5000 psi. Land tbg. RILDS. Muleshoe on
tailpipe landed at 6901' (9' inside L TP).
Reverse circulate in 4 bbls corrosion inhibited brine followed by
180 bbls clean brine to place the corrosion inhibited brine
Printed: 12/29/2003 9:47:18AM
..,
..
BP
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-205
W-205
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 12/10/2003
Rig Release: 12/28/2003
Rig Number:
Spud Date: 8/23/2003
End: 12/28/2003
Date From - To Hours Task Code NPT Phase Description of Operations
12/2812003 05:00 - 06:30 1.50 RUNCO~ COMP between the bottom GLM and the top of the packer.
06:30 - 08:30 2.00 RUNCO~ COMP Drop ball & rod. Pressure up to 4200 psi to set packer. Bleed
pressure to 3500 psi and hold for 30 minutes for tbg test. Bleed
tbg pressure to 2000 psi and pressure up annulus to 3500 psi,
hold for 30 minute for annular and packer test. Bleed both tbg
and annulus pressure to 0 psi. Pressure up annulus, DCK
valve sheared at 2600 psi. Establish circulation; 2bpm. 600 psi.
08:30 - 09:30 1.00 RUNCO~ COMP RD circulating equipment. Break out landing joint. Install TWC.
pressure test to 1000 psi.
09:30 -10:00 0.50 RUNCO~ COMP RD casing equipment, CO bails, blow down lines.
10:00 -11:00 1.00 BOPSU¡;P COMP ND BOPE
11:00 -13:30 2.50 WHSUR P COMP NU tree and adapter flange
13:30 - 14:30 1.00 WHSUR P COMP Pressure test ports in tbg hanger used for I-Wire and Tubel
gauge to 5000 psi
14:30 - 15:00 0.50 WHSUR P COMP RU DSM and pull TWC through lubricator.
15:00 - 15:30 0.50 WHSUR P COMP RU Little Red to freeze protect
15:30 - 16:00 0.50 WHSUR P COMP PJSM with Little red and all rig personnel on pumping diesel.
16:00 - 17:00 1.00 WHSUR P COMP Pump 110 bbl diesel down the annulus to freeze protect well at
2 bpm.
ICP = 400 psi FCP = 875 psi
17:00 - 18:00 1.00 WHSUR P COMP Allow diesel to U-tube. Final tbg and inner annulus pressure =
225 psi
18:00 - 19:30 1.50 WHSUR P COMP RU DSM and install BPV through lubricator, Test BPV to 1000
psi with Little Red.
19:30 - 20:30 1.00 WHSUR P COMP Install VR plugs in tbg spool outlets.
20:30 - 21 :00 0.50 WHSUR P COMP Secure well. Install gauges.
RELEASE RIG @ 21 :00
Printed: 1212912003 9:47:16 AM
TREE = FMC4-1/6" 5M
We.LI"EAO = FMC GEN 5
ACTUATOR =
KB. ELEV =
BF. ElEV =
KOP=
Max Angle =
Datum MD =
Datum TVD =
.
80.90'
54.50'
300'
91 @ 8481'
5713'
4500' SS 120# OONDJCTOR H
110-3/4" CSG. 40#, L-80, 10 = 9.95" H 3985'
Minimum ID ::: 2.750" @ 7627' I
4-112" HES XN NIPPLE
14.5~OENX DSOiRGE-ffiESS SUB,IO = 3.85" H 61W
W-205 From DRLG
W-205 L 1
W-20 5 L2
~NOTES:
\08 ,
~
~
L
['"":II
14.8'A+JXM.L~Ð=3.£œ' H ë/tff ~
iT."" "e"'M Go."" D· '¡: TA~ HI =- ft
17-S/8" x 5.5" BKR ZXPPACKER,IO = 5.5" H 6892'
IBKR HJGI-ES HOOKWAlL HGR, 10= 5.64" H 6925' rI
1Rt>. TAGH 7119'
17-S/8" x S.5" BKR ZXPPACKER,IO = S.5" H 7135'
IBKR H.JGI-ES HOOKWALL HGR, 10 = 5.64" H
IRA TAG ~
ÆRFORt>. TON SUM\1ARY
REF LOO:
ANGLE AT TOP PERF: 67@ 7201'
Note: ~fer to Production DB for historical perf data
SIZE SA= INlERVAL OpnlSqz DATE
4-1/2" SLTD OBA 7003 - ~ l09ð'1 12/28103
4-1/2" SLTD OBC 7246 - 'teM!t 10$9'1 12/20103
4-1/2" SLTO OBD 7700 - 4Q6;ri \tAN1 09/07/03
7491
fR
175/8" CSG, 26#, L-80, 10 = 6.276" H 7618' ~
~ 10520' ,
-r t:) ~"'" \0<..70
OATE
09/09/03
09/13/03
09/29/03
10/12/03
12/28/03
REV BY OOMM:NTS
JOM'KK ORIGINAL OOIvPl.ETION
R\lVUKK GL V C/O
J...J/TLH Mn 10 & Nipple Correction
KCFlTLP FÐTD Correction
JIIC AOO L1 & L2
Qð, TE
RBI BY
~
~58<{'
1 ~ H4-1/Z' I-ESX NP, D =3.813" ,
GAS LIFT Ml\N)RELS
OBI TYPE VL V LA TCH
45 KBG-2 WY BK-S
57 KBG-2 WY BK-5
60 KBG-2 OCK2 BS<
OATE
12/28103
12/28103
12/28103
~
ST t..£> I TVO
3 30~ 2503
2 ~ '11" 4831
1 ~ 4888
PORT
o
o
eø7""-
&Mr H4-1/2"BKRCt..£>SLEEV~ 10=3.813" ,
~ ~ H7.62S" X 4.S" BKRPRM A<R, 10 = 3.875"
"I4"¡ ..i8St'J" H4-1/Z' I-ES X NP, 0 = 3.813" 1
I 68!6 H4-1/Z' I-ESX NP,10=3.813" 1
~1_~_~4-_1~_~~~~_;J, 'I
I L.~ 7" WNOOW @ 6930'
J - SboL.td-J~~3J-1])_ctt-_lO
1
7003' -10631' 6-314" OBA LATERAL.. , D = 3.958"
I 7143' VH4-1/Z' Mile Shoe ,
~S~~~ _~~ ~c?~'{t?}- _ _ ='=]0 ~I ,O(¿ðO
I L \ 7" WIN)OW @ 7173'
......
I -----------------
x
7246' -1 0640' 6-314" OBC LATERAL.., D = 3.958"
7700' -10667' 6-314" OBD LATERAL.., D = 3.958"
OOMJIENTS
ORION lJIIfT
WELL: W-20S, W-20S L 1, W-205 L2
PERMrr NJ: 203116 (2æ) (201)
AA NJ: SO-029-23165-00(60) (61)
SEe 21, T11 N, R12E. 3703' NSL & 1196' We.
7525' H7.625" X S.5" BKRZXPLr-R TOPPKR, 10 = 4.810"
7535' """H4-112" Mule Shoe ,
~r 7531' H5-1IZ' X4-1/2"XO, 10= 3.958" ,
I 76Zl' H4-1IZ' I-ES XN NIP, 10 = 2.750" ,
I I 17610' CTM H2.5" IBP ,
I I
I I
I I
I I
I I
I I ~
U
BP Exploration (Alaska)
. .
W-205L 1 Survey Report Schlumberuer
Report Date: 17-Dec-D4 Survey I DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 1.560'
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure I Slot: W-PAD / W-205 TVD Reference Datum: Rotary Table
Well: W-205 TVD Reference Elevation: 80.90 ft relative to MSL
Borehole: W-205L 1 Sea Bed / Ground Level Elevation: 52.40 ft relative to MSL
UWVAPI#: 500292316560 Magnetic Declination: 25.229"
Survey Name I Dale: W-205L 1 / December 17, 2004 Total Field Strength: 57559.190 nT
Tort / AHD / DDI/ ERD ratio: 332.718" /8138.48 ft / 6.746 /1.569 Magnetic Dip: 80.809"
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 18, 2003
Location Latllong: N 70 17 45.811, W 149533.633 Magnetic Declination Model: BGGM 2003
Location Grid N/E YIX: N 5958680.130 ftUS, E 612048.970 ftUS North Reference: True North
Grid Convergence Angle: +0.85420613" Total Corr Mag North -> True North: +25.229'
Grid Scale Factor: 0.99991426 Local Coordinates Referenced To: Well Head
r Measured I Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I Alon9 Hole I NS EW I DLS I Build Rate I Watk Rate 1 Northin9 Easting latitude Long~ude
Depth Section Departure
(ft) ( deg) ( deg) (ft) (ft) (It) (ft) (ft) (ft) (deg/1ooft) (deg/looft) (degl100ft) (ftUS) (ftUS)
0.00 0.00 0.00 0.00 -80.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5958680.13 612048.97 N 70 1745.811 W 149 5 33.633
138.20 0.07 88.07 138.20 57.30 0.01 0.08 0.00 0.08 0.05 0.05 0.00 5958680.13 612049.05 N 70 1745.811 W 149 5 33.630
239.52 0.61 54.75 239.52 158.62 0.33 0.68 0.32 0.59 0.55 0.53 -32.89 5958680.45 612049.55 N 70 1745.814 W 149 5 33.616
300.39 2.25 63.08 300.37 219.47 1.10 2.20 1.04 1.92 2.71 2.69 13.68 595868 I .20 612050.87 N 70 1745.821 W 149 5 33.577
390.94 5.17 82.77 390.72 309.82 2.57 8.00 2.36 7.55 3.47 3.22 21.74 5958682.60 612056.48 N 70 1745.834 W 149533.413
483.11 6.93 92.96 482.38 401 .48 3.07 17.69 2.60 17.22 2.23 1.91 11.06 5958682.98 612066.15 N 70 17 45.837 W 149533_131
576.06 8.31 96.29 574.50 493.60 2.38 30.01 1.57 29.50 1.56 1.48 3.58 5958682.14 612078.44 N 70 17 45.827 W 149532.773
671.50 10.95 97.11 668.59 587.69 0.93 45.98 -0.31 45.35 2.77 2.77 0.86 5958680.50 612094.32 N 70 17 45.808 W 149532.311
765.37 13.56 93.83 760.31 679.41 -0.37 65.90 -2.14 65.19 2.88 2.78 -3.49 5958678.96 612114.17 N 70 1745.790 W 149531.733
859.95 15.67 90.40 851.83 770.93 -0.55 89.75 -2.97 89.02 2.41 2.23 -3.63 5958678.48 612138.02 N 701745.782 W 149531.038
954.66 18.74 90.44 942.29 861.39 0.01 117.76 -3.18 117.03 3.24 3.24 0.04 5958678.70 612166.03 N 70 1745.780 W 149530.222
1050.16 23.91 88.55 1031.22 950.32 1.32 152.48 -2.81 151.75 5.46 5.41 -1.98 5958679.58 612200_73 N 70 1745.783 W 149529.210
1144.14 27.46 91.14 1115.91 1035.01 2.48 193.20 -2.76 192.46 3.96 3.78 2.76 5958680.24 61224 1.44 N 70 1745.784 W 149 5 28.023
1238.39 29.92 90.46 1198.58 1117.68 3.09 238.44 -3.38 237.70 2.63 2.61 -0.72 5958680.30 612286.67 N 70 1745.778 W 149526.704
1333.55 33.56 88.26 1279.50 1198.60 5.06 288.49 -2.77 287.74 4.01 3.83 -2.31 5958681.65 612336_70 N 70 1745.784 W 149525.246
1427.00 38.84 92.23 1354.89 1273.99 6.21 343.65 -3.13 342.89 6.18 5.65 4.25 5958682.12 612391.84 N 70 1745.780 W 149523.639
1521.98 43.73 92.85 1426.24 1345.34 5.12 406.30 -5.92 405.47 5.17 5.15 0.65 5958680.26 612454.45 N 70 1745.753 W 149521.814
1616.01 45.76 92.04 1493.02 1412.12 4.11 472.49 -8.73 471.60 2.24 2_16 -0.86 5958678.43 612520.61 N 70 1745.725 W 149519.887
1709.89 45.49 93.10 1558.68 1477.78 2.93 539.59 -11.74 538.64 0.86 -0.29 '1.13 5958676.42 612587.67 N 70 17 45.695 W 149517.933
1803.35 44.15 92.96 1624.97 1544.07 1.24 605.47 -15.22 604.42 1.44 -1.43 -0.15 5958673.92 612653.50 N 70 1745.661 W 149516.016
1898.67 42.83 93.34 1694.12 1613.22 -0.58 671.07 -18.83 669.92 1.41 -1.38 0.40 5958671.29 612719.04 N 70 17 45.626 W149514.106
1992.58 42.02 93.80 1763.44 1682.54 -2.80 734.42 -22.77 733.15 0.92 -0.86 0.49 5958668.29 612782.32 N 70 1745.587 W 149512.263
2087.21 41.64 93.69 1833.96 1753.06 -5.21 797.53 -26.89 796.13 0.41 ·0.40 -0.12 5958665.11 612845.34 N 70 1745.546 W 149510.428
2182.02 42.33 93.42 1904.43 1823.53 -7.42 860.95 -30.82 859.43 0.75 0.73 -0.28 5958662.12 612908.69 N 70 1745.507 W 14958.583
2276.41 41.86 93.01 1974.47 1893.57 -9.24 924.23 -34.37 922.60 0.58 -0.50 -0.43 5958659.52 612971.90 N 70 1745.472 W 14956.741
2371.24 43.94 92.92 2043.93 1963.03 -10.83 988.78 -37.71 987.07 2.19 2.19 -0.09 5958657.14 613036.40 N 70 1745.440 W 14954.863
2465.72 44.80 90.69 2111.47 2030.57 -11.10 1054.84 -39.78 1053.09 1.88 0.91 -2.36 5958656.05 613102.45 N 70 1745.419 W 14952.938
2560.07 44.84 89.82 2178.40 2097.50 -9.58 1121.34 -40.08 1119.60 0.65 0.04 -0.92 5958656.75 613168.94 N 70 1745.416 W 14951.000
2654.53 44.98 90.34 2245.30 2164.40 -7.86 1188.03 -40.17 1186.28 0.42 0.15 0.55 5958657.65 613235.62 N 70 1745.415 W 149459.056
2750.20 44.95 90.82 2312.99 2232.09 -6.71 1255.64 -40.86 1253.89 0.36 -0.03 0.50 5958657.97 613303.22 N 70 1745.408 W 149457.085
2845.05 44.48 90.47 2380.39 2299.49 -5.64 1322.37 -41.61 1320.62 0.56 -0.50 -0.37 5958658.22 613369.95 N 70 17 45.401 W 149455.140
2940.21 44.54 87.54 2448.26 2367.36 -2.67 1389.08 -40.45 1387.30 2.16 0.06 -3.08 5958660.37 613436.60 N 70 17 45.412 W 149453.197
3034 .42 44.39 87.64 2515.49 2434.59 1.90 1455.07 -37.67 1453.24 0.18 -0.16 0.11 5958664.13 6 I 3502.48 N 70 17 45.439 W 149451.275
3129.22 44.11 87.91 2583.40 2502.50 6.27 1521.22 -35.11 1519.34 0.36 -0.30 0.28 5958667.68 613568.53 N 701745.464 W 149 4 49.348
3221.57 44.52 88.27 2849.48 2568.58 10.17 1585.74 -32.96 1583.82 0.52 0.44 0.39 5958670.79 613632.96 N 70 17 45.485 W 149447.469
3315.03 44.46 88.48 2716.15 2635.25 13.81 1651.23 -31.10 1649.29 0.17 -0.06 0.22 5958673.62 613698.39 N 70 17 45.503 W 149445.561
3409.53 44.42 88.46 2783.62 2702.72 17.38 1717.40 -29_33 1715.43 0.04 -0.04 -0.02 5958676.38 613784.49 N 70 1745.521 W 149 4 43.633
3504.53 44.80 88.89 2851.25 2770.35 20.74 1784.11 -27.79 1782.13 0.51 0.40 0.45 5958678.91 613831.16 N 70 17 45.536 W 149441.689
3598.91 45.06 89.18 2918.07 2837.17 23.67 1850.77 -26.67 1848.77 0.35 0.28 0.31 5958681.03 613897.77 N 70 1745.547 W 149439.746
3694.74 46.75 88.01 2984.75 2903.85 27.24 1919.59 -24.97 1917.57 1.97 1.76 -1.22 5958683.75 613966.53 N 70 1745.563 W149437.741
3788.33 46.72 88.07 3048.90 2968.00 31.43 1987.74 -22.64 1985.68 0.06 -0.03 0.06 5958687.10 614034.59 N 70 17 45.586 W 149435.756
3882.04 48.58 88.49 3112.02 3031.12 35.39 2056.99 -20.56 2054.90 2.01 1.98 0.45 5958690.20 614103.77 N 70 17 45.606 W 149433.738
3935.59 49.24 88.61 3147.22 3066.32 37.50 2097.35 -19.54 2095.25 1.24 1.23 0.22 5958691.82 614144_09 N 70 17 45.616 W 149432.562
4029.51 47.87 88.73 3209.38 3128.48 41.05 2167.75 -17.91 2165.63 1.46 -1.46 0.13 5958694.51 614214.44 N 70 17 45.632 W 149430.511
4125.83 47.53 88.86 3274.21 3193.31 44.49 2238.99 -16.41 2236.86 0.37 -0.35 0.13 5958697.07 614285.63 N 70 17 45.646 W 149428.435
4219.70 47.06 88.57 3337.87 3256.97 47.91 2307.97 -14.86 2305.82 0.55 -0.50 -0.31 5958699.64 614354.55 N 70 1745.661 W 149 4 26.424
4313.18 47.50 90.07 3401 .29 3320.39 50.60 2376.65 -14.05 2374.49 1.27 0.47 1.60 5958701 .48 614423.19 N 70 1745.669 W 149 4 24.423
4408.39 49.25 90.60 3464.53 3383.63 52.11 2447.82 -14.47 2445.65 1.88 1.84 0.56 5958702.12 614494.35 N 70 1745.665 W 149422.349
4502.06 49.19 90.52 3525.71 3444.81 53.35 2518.74 -15.17 2516.58 0.09 -0.06 -0.09 5958702.48 614565.27 N 70 17 45.658 W 149420.281
4596.92 48.95 90.38 3587.86 3506.96 54.74 2590.41 -15.73 2588.24 0.28 -0.25 -0.15 5958702.99 614636.93 N 70 1745.652 W149418.193
SurveyEditor Ver 3.1 RT-SP3.03-HF2.03 Bld( d031rt-546)
W-205\W-205\W-205L 1\W-205L 1
Generated 1/23/2004 1 :24 PM Page 1 of 4
. .
r Measured I Inclination I Azimuth 1 TVD I Sub-Sea TVD I Vertical 1 Along Hole 1 NS EW I DLS I Build Rale I Walk Rate I Northing Easting Lal~ude longitude
Deplh Section Departure
(ft) (deg) (deg) (fl) (ft) (ft) (ft) (ft) (It) (deg/100 It) ( deg/100 ft) ( deg/100 ft) (ftUS) (ItUS)
4692.21 48.79 90.24 3650.54 3569.64 56.30 2662.19 -16.12 2660.02 0.20 -0.17 -0.15 5958703.67 614708.70 N 70 17 45.648 W 149416.101
4786.94 48.40 89.75 3713.19 3632.29 58.24 2733.24 -16.11 2731.07 0.57 -0.41 -0.52 5958704.73 614779.74 N 70 17 45.648 W 149414.030
4881.27 47.90 89.49 3776.13 3695.23 60.62 2803.50 -15.65 2801 .33 0.57 -0.53 -0.28 5958706.25 614849.98 N 70 17 45.652 W 149411.982
4976.33 47.54 89.45 3840.08 3759.18 63.19 2873.84 -15.00 2871.66 0.38 -0.38 -0.04 5958707.94 614920.28 N 70 17 45.658 W 14949.932
5070.7b 47.15 89.05 3904.02 3823.12 65.98 2943.24 -14.09 2941.06 0.52 -0.41 -0.42 5958709.89 614989.66 N 70 17 45.667 W 14947.909
5164.92 46.92 88.98 3968.24 3887.34 69.05 3012.19 -12.90 3010.00 0.25 -0.24 -007 5958712.10 615058.56 N 70 17 45.678 W 14945.900
5260.11 47.44 91.19 4032.94 3952.04 70.84 3082.00 -13.01 3079.81 1.79 0.55 2.32 5958713.03 615128.36 N 70 1745.677 W 14943.865
5353.62 47.09 90.56 4096.40 4015.50 71.66 3150.69 -14.06 3148.48 0.62 -0.37 -0.67 5958713.00 615197.04 N 70 17 45.666 W 14941.863
5448.04 46.84 90.99 4160.84 4079.94 72.60 3219.70 -15.00 3217.49 0.43 -0.26 0.46 5958713.10 615266.05 N 70 17 45.657 W 149359.852
5542.45 47.35 93.52 4225.11 4144.21 71.76 3288.85 -17.72 3286.58 2.04 0.54 2.68 5958711.40 615335.16 N 70 17 45.630 W 149357.838
5637.51 48.32 97.51 4288.94 4208.04 66.88 3359.30 -24.51 3356.69 3.27 1.02 4.20 5958705.66 615405.35 N 70 1745.563 W 149355.795
5730.86 48.49 102.79 4350.93 4270.03 56.46 3429.09 -36.81 3425.36 4.23 0.18 5.66 5958694.39 615474.20 N 70 1745.441 W 149353.793
5827.15 48.36 104.32 4414.83 4333.93 41.49 3501.12 -53.69 3495.38 1.20 -0.14 1.59 5958678.56 615544.46 N 70 17 45.275 W 149351.752
5922.20 47.21 99.09 4478.72 4397.82 29.07 3571.49 -67.99 3564.26 4.25 -1.21 -5.50 5958665.29 615613.54 N 70 1745.134 W 149349.745
6018.20 47.43 95.71 4543.81 4462.91 21.89 3642.06 -77.07 3634.23 2.60 0.23 -3.52 5958657.25 615683.63 N 70 17 45.044 W 149347.706
6113.56 49.51 92.20 4607.04 4526.14 18.95 3713.43 -81.96 3705.42 3.51 2.18 -3.68 5958653.42 615754.88 N 70 1744.996 W 149345.631
6207.77 51.06 88.79 4667.25 4586.35 20.32 3785.89 -82.56 3777.87 3.23 1.65 -3.62 5958653.90 615827.32 N 70 1744.990 W 149343.519
6301.13 54.14 83.06 4723.98 4643.08 27.67 3860.02 -77.22 3851.78 5.89 3.30 -6.14 5958660.34 615901.14 N 70 17 45.042 W 149341.365
6393.40 55.11 76.89 4777.43 4696.53 42.79 3935.23 -64.11 3925.80 5.55 1.05 ·6.69 5958674.55 615974.95 N 70 1745.170 W 149339.207
6486.61 56.60 71.66 4829.77 4748.87 65.73 4012.36 -43.19 4000.01 4.91 1.60 -5.61 5958696.58 616048.82 N 70 1745.376 W 149337.044
6582.21 60.06 67.40 4879.97 4799.07 96.28 4093.70 -14.69 4076.17 5.24 3.62 ·4.46 5958726.20 616124.55 N 70 17 45.656 W 149334.824
6676.53 63.26 62.27 4924.76 4843.86 133.64 4176.69 20.64 4151.24 5.87 3.39 -5.44 5958762.64 616199.08 N 70 1746.003 W 149332.635
6771.35 64.85 57.71 4966.26 4885.36 178.28 4261.94 63.28 4225.03 4.64 1.68 -4.81 5958806.38 616272.22 N 70 17 46.422 W 149330.483
6865.05 65.91 55.97 5005.30 4924.40 226.80 4347.12 109.88 4296.33 2.03 1.13 -1.86 5958854.03 616342.81 N 70 17 46.880 W 149328.404
6958.08 68.13 53.24 5041.62 4960.72 278.29 4432.76 159.49 4366.13 3.60 2.39 -2.93 5958904.67 616411.85 N 70 1747.367 W 149326.369
7052.54 70.37 52.60 5075.09 4994.19 333.45 4521.09 212.75 4436.59 2.45 2.37 -0.68 5958958.97 616481.51 N 70 1747.891 W 149324.314
7147.59 73.28 51.97 5104.73 5023.83 390.62 4611.39 267.99 4508.02 3.13 3.06 -0.66 5959015.27 616552.10 N 70 17 48.433 W 149322.231
",7173.00 73.97 52.13 5111.90V 5031.00 406.13 4635.76 282.98 4527.25 2.78 2.72 0.63 5959030.54 616571.10 N 70 1748.581 W 149321.671
7185.00 75.84 51.68 5115.02 5034.12 413.52 4647.35 290.13 4536.36 16.00 15.58 -3.75 5959037.82 616580.11 N 70 1748.651 W 149321.405
7210.58 79.48 50.92 5120.49 5039.59 429.67 4672.34 305.75 4555.86 14.52 14.23 -2.97 5959053.73 616599.37 N 70 1748.805 W 149320.836
7242.00 85.05 50.00 5124.72 5043.82 450.13 4703.46 325.57 4579.86 17.96 17.73 -2.93 5959073.90 616623.07 N 70 17 48.999 W 149320.136
7273..10 84.97 49.10 5127.42 5046.52 470.86 4734.44 345.67 4603.44 2.89 ·0.26 -2.89 5959094.35 616646.34 N 70 1749.197 W 149319.449
7304.49 84.70 48.20 5130.25 5049.35 492.15 4765.70 366.32 4626.90 2.98 -0.86 -2.87 5959115.35 616669.49 N 70 1749.400 W 149318.764
7336.33 86.29 47.29 5132.75 5051.85 514.12 4797.44 387.66 4650.40 5.75 4.99 -2.86 5959137.04 616692.66 N 701749.610 W 149318.079
7367.07 89.01 46.42 5134.01 5053.11 535.72 4828.15 408.66 4672.80 9.29 8.85 -2.83 5959158.37 616714.75 N 70 1749.816 W 149317.426
7398.19 88.70 45.45 5134.63 5053.73 557.96 4859.27 430.30 4695.16 3.27 -1.00 -3.12 5959180.34 616736.78 N 701750.029 W 149316.774
7429.37 87.19 44:67 5135.75 5054.85 580.57 4890.43 452.31 4717.22 5.45 -4.84 -2.50 5959202.67 616758.51 N 70 17 50.245 W 149316.130
7460.79 87.37 43.79 5137.24 5056.34 603.64 4921.81 474.80 4739.11 2.86 0.57 -2.80 5959225.48 616780.06 N 70 17 50.466 W 149315.492
7491.33 87.98 43.46 5138.48 5057.58 626.30 4952.33 496.89 4760.16 2.27 2.00 -1.08 5959247.88 616800.78 N 70 17 50.683 W 149314.878
7522.92 87.92 41.20 5139.61 5058.71 650.20 4983.90 520.23 4781.42 7.15 -0.19 -7.15 5959271.53 616821.68 N 70 17 50.912 W 149314.258
7554.45 88.22 39.10 5140.67 5059.77 674.83 5015.41 544.31 4801.74 6.72 0.95 -6.66 5959295.91 616841.64 N 70 1751.149 W 149313.665
7585.32 88.33 39.00 5141.60 5060.70 699.31 5046.26 568.27 4821.18 0.48 0.36 -0.32 5959320.16 616860.72 N 70 1751.385 W 149313.098
7616.11 88.74 39.36 5142.39 5061 .49 723.69 5077.04 592.13 4840.62 1.77 1.33 1.17 5959344.31 616879.80 N 70 1751.619 W 149312.531
7647.03 89.15 39.79 5142.96 5062.06 748.05 5107.96 615.96 4860.32 1.92 1.33 1.39 5959368.42 616899.14 N 70 1751.854 W149311.956
7678.89 89.63 40.06 5143.29 5062.39 773.03 5139.82 640.39 4880.76 1.73 1.51 0.85 5959393.15 616919.22 N 70 17 52.094 W 149311.360
7708.77 87.81 38.68 5143.96 5063.06 796.63 5169.69 663.49 4899.71 7.64 -6.09 -4.62 5959416.52 616937.82 N 70 1752.321 W 149310.807
7739.93 87.30 38.00 5145.29 5064.39 821.56 5200.82 687.90 4919.02 2.73 -1.64 -2.18 5959441.22 616956.76 N 70 1752.561 W 149310.243
7771.17 89.32 41.27 5146.21 5065.31 846.14 5232.04 711.95 4938.94 12.30 6.47 10.47 5959465.56 616976.31 N 70 1752.797 W 14939.662
7802.67 89.53 43.02 5146.53 5065.63 870.06 5263.54 735.30 4960.07 5.60 0.67 5.56 5959489.22 616997.10 N 70 17 53.027 W 14939.046
7833.60 87.20 43.49 5147.41 5066.51 893.14 5294.46 757.82 4981.26 7.68 -7.53 1.52 5959512.05 617017.94 N 70 17 53.248 W 14938.428
7864.14 87.51 44.15 5148.82 5067.92 915.72 5324.96 779.83 5002.38 2.39 1.02 2.16 5959534.37 617038.73 N 70 17 53.464 W 14937.812
7895.81 89.25 41.37 5149.72 5068.82 939.54 5356.62 803.07 5023.87 10.35 5.49 -8.78 5959557.93 617059.87 N 70 17 53.693 W 14937.185
7927.18 91.07 37.95 5149.63 5068.73 964 .22 5387.99 827.21 5043.89 12.35 5.80 -10.90 5959582.37 617079.52 N 70 17 53.930 W 14936.601
7957.67 90.32 34.57 5149.26 5068.36 989.28 5418.48 851.79 5061.92 11.35 -2.46 -11.09 5959607.21 617097.18 N 70 1754.172 W 14936.075
7989.08 87.37 31.57 5149.89 5068.99 1016.05 5449.88 878.10 5079.05 13.39 -9.39 -9.55 5959633.77 617113.92 N 70 17 54.430 W 14935.575
8020.04 84.96 29.06 5151.96 5071.06 1043.13 5480.77 904.77 5094.64 11.23 -7.78 -8.11 5959660.66 617129.11 N 70 1754.692 W 14935.120
8051.30 82.89 25.77 5155.27 5074.37 1071.09 5511.85 932.35 5108.95 12.38 ·6.62 -10.52 5959688.46 617143.01 N 70 17 54.964 W 14934.702
8081.97 82.92 21.95 5159.06 5078.16 1099.25 5542.28 960.18 5121.26 12.36 0.10 -12.46 5959716.46 617154.90 N 70 1755.237 W 14934.343
8112.68 87.57 21.85 5161.61 5080.71 1127.93 5572.88 988.57 5132.67 15.15 15.14 -0.33 5959745 02 617165.88 N 70 1755.516 W 14934.010
8144.29 92.55 19.28 5161.57 5080.67 1157.81 5604.48 1018.15 5143.77 17.73 15.75 -8.13 5959774.76 617176.54 N 70 17 55.807 W 14933.685
8174.58 94.95 17.85 5159.59 5078.69 1186.71 5634.70 1046.80 5153.39 9.22 7.92 -4.72 5959803.55 617185.73 N 70 17 56.089 W 14933.404
8204.91 94.91 17.94 5156.99 5076.09 1215.71 5664.92 1075.56 5162.68 0.32 -0.13 0.30 5959832.43 617194.59 N 70 17 56.372 W 14933.133
8236.71 92.99 19.83 5154.80 5073.90 1245.99 5696.64 1105.57 5172.95 8.46 -6.04 5.94 5959862.60 617204.41 N 70 17 56.667 W 14932.833
8267.37 89.25 20.17 5154.20 5073.30 1275.07 5727.29 1134.37 5183.43 12.25 -12.20 1.11 5959891.55 617214.46 N 70 17 56.950 W 14932.527
8298.60 87.23 15.86 5155.16 5074.26 1304.99 5758.50 1164.05 5193.08 15.24 -6.47 -13.80 5959921.36 617223.67 N 70 17 57.242 W 14932.245
8329.36 87.88 11.01 5156.47 5075.57 1335.06 5789.24 1193.93 5200.22 15.89 2.11 -15.77 5959951.34 617230.36 N 70 17 57.536 W 14932.036
8359.15 87.50 5.65 5157.67 5076.77 1364.61 5819.00 1223.37 5204.53 18.02 -1.28 -17.99 5959980.84 617234.23 N 70 17 57.825 W 14931.910
8390.37 89.56 1.75 5158.47 5077.57 1395.79 5850.21 1254.51 5206.54 14.12 6.60 -12.49 5960012.00 617235.78 N 70 1758.131 W 14931.851
8423.11 92.51 359.63 5157.88 5076.98 1428.51 5882.94 1287.24 5206.94 11.09 901 -6.48 5960044.73 617235.68 N 70 17 58.453 W 14931.839
SurveyEditor Ver 3.1 RT-SP3.03-HF2.03 Bld( d031 rt-546 )
W-205\W-205\W-205L 1\W-205L 1
Generated 1/23/2004 1 :24 PM Page 2 of 4
. .
Measured 1 Inclination I Azimuth I TVD 1 Sub-Sea TVD 1 Vertical I Along Hole I NS EW 1 DLS I Build Rate I Walk Rate I Northing Easting Latitude Long~ude
Depth Section Departure
(ft) ( deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (degl100 It) ( degl100 ft ) (degl100 ft) (ftUS) (ftUS)
8453.41 91.89 357.17 5156.72 5075.82 1458.74 5913.22 1317.50 5206.09 8.37 -2.05 -8.12 5960074.97 617234.39 N 701758.751 W 14931.863
8484.77 91.31 356.47 5155.84 5074.94 1489.98 5944.57 1348.80 5204.35 2.90 -1.85 -2.23 5960106.24 617232.18 N 70 17 59.059 W14931.913
8515.82 91.82 355.88 5154.99 5074.09 1520.88 5975.61 1379.77 5202.28 2.51 1.64 -1.90 5960137.17 617229.65 N 701759.363 W14931.972
8547.13 92.34 355.79 5153.86 5072.96 1552.02 6006.89 1410.97 5200.01 1.69 1.66 -0.29 5960168.34 617226.91 N 70 17 59.670 W 14932.038
8579.87 91.38 356.81 5152.79 5071.89 1584.60 6039.62 1443.63 5197.90 4.28 -2.93 3.12 5960200.96 617224.31 N 701759.991 W 14932.099
8609.58 90.69 356.64 5152.26 5071.36 1614.20 6069.32 1473.28 5196.20 2.39 -2.32 -0.57 5960230.58 617222.18 N 70 180.283 W 14932.148
8640.28 90.90 357.30 5151.83 5070.93 1644.80 6100.02 1503.94 5194.58 2.26 0.68 2.15 5960261 .20 617220.10 N 70 180.585 W 14932.194
8671.95 89.49 356.80 5151.72 5070.82 1676.37 6131.69 1535.57 5192.95 4.72 -4.45 -1.58 5960292.80 617218.00 N 70 180.896 W14932.241
8704.16 89.42 357.18 5152.03 5071.13 1708.47 6163.90 1567.73 5191.26 1.20 -0.22 1.18 5960324.93 617215.82 N 70 181.212 W 14932.290
8734.58 89.49 357.25 5152.32 5071.42 1738.81 6194.31 1598.11 5189.78 0.33 0.23 0.23 5960355.29 617213.89 N 70 181.511 W 14932.333
8765.50 89.45 356.86 5152.61 5071.71 1769.63 6225.23 1628.99 5188.19 1.27 -0.13 -1.26 5960386.14 617211.85 N70181.814 W 14932.378
8796.77 89.52 355.81 5152.89 5071.99 1800.77 6256.50 1660.19 5186.19 3.37 0.22 -3.36 5960417.30 617209.38 N 70 182.121 W 14932.436
8827.54 89.69 355.63 5153.10 5072.20 1831.38 6287.27 1690.88 5183.90 0.80 0.55 -0.58 5960447.95 617206.63 N 70 182.423 W 14932.502
8859.42 89.49 353.53 5153.33 5072.43 1863.02 6319.15 1722.61 5180.88 6.62 -0.63 -6.59 5960479.63 617203.15 N 70182.735 W 14932.589
8890.44 89.63 350.44 5153.56 5072.66 1893.60 6350.17 1753.33 5176.56 9.97 0.45 -9.96 596051 0.27 617198.36 N 70183.037 W 14932.715
8922.35 90.00 350.57 5153.67 5072.77 1924.92 6382.08 1784.80 5171.30 1.23 1.16 0.41 5960541 .66 617192.63 N 70183.347 W 14932.868
8953.28 90.41 350.25 5153.56 5072.66 1955.26 6413.01 1815.30 5166.14 1.68 1.33 -1.03 5960572.08 61718703 N 70 183.647 W 14933.017
8982.55 88.91 349.75 5153.73 5072.83 1983.94 6442.28 1844.12 5161.06 5.40 -5.12 -1.71 5960600.82 617181.51 N 70 183.930 W 14933.165
9012.89 88.39 349.53 5154.45 5073.55 2013.62 6472.61 1873.96 5155.61 1.86 -1.71 -0.73 5960630.57 617175.62 N 70 184.224 W 14933.323
9044.39 87.87 348.90 5155.47 5074.57 2044.37 6504.09 1904.88 5149.72 2.59 -1.65 -2.00 5960661 .40 617169.27 N 70 184.528 W 14933.494
9075.39 88.25 347.37 5156.52 5075.62 2074.51 6535.07 1935.20 5143.35 5.08 1.23 -4.94 5960691.62 617162.44 N 70 184.826 W 14933.679
9106.58 88.05 344.99 5157.53 5076.63 2104.56 6566.25 1965.47 5135.90 7.65 -0.64 -7.63 5960721 .77 617154.55 N70185.124 W 14933.896
9137.66 87.67 345.14 5158.69 5077.79 2134.34 6597.31 1995.48 5127.89 1.31 -1.22 0.48 5960751.65 617146.10 N 70 185.419 W 14934.129
9168.95 87.81 345.96 5159.92 5079.02 2164.39 6628.57 2025.76 5120.09 2.66 0.45 2.62 5960781 .81 617137.85 N 70 185.717 W 14934.356
9200.48 88.80 346.57 5160.86 5079.96 2194.79 6660.09 2056.37 5112.61 3.69 3.14 1.93 5960812.31 617129.91 N 70 186.018 W 14934.573
9232.12 89.93 346.15 5161.21 5080.31 2225.32 6691.73 2087.12 5105.15 3.81 3.57 -1.33 5960842.93 617121.99 N 70 186.321 W 14934.790
9263.31 90.14 346.36 5161.19 5080.29 2255.41 6722.92 2117.41 5097.74 0.95 0.67 0.67 5960873.11 617114.13 N 70 186.619 W 14935.006
9294.31 89.18 345.19 5161.37 5080.47 2285.24 6753.91 2147.46 5090.12 4.88 -3.10 -3.77 5960903.04 617106.07 N 70 186.914 W 14935.227
9326.33 88.01 342.96 5162.16 5081.26 2315.77 6785.92 2178.24 5081.34 7.86 -3.65 -6.96 5960933.68 617096.83 N 70 187.217 W 14935.482
9356.78 86.06 342.32 5163.73 5082.83 2344.53 6816.33 2207.26 5072.27 6.74 -6.40 -2.10 5960962.57 617087.32 N 70 187.502 W 14935.746
9388.73 85.72 342.36 516602 5085.12 2374.62 6848.20 2237.63 5062.60 1.07 -1.06 0.13 5960992.78 617077.21 N 70 187.801 W 14936.028
9419.81 85.92 341.68 5168.29 5087.39 2403.83 6879.20 2267.11 5053.03 2.28 0.64 -2.19 5961022.12 617067.20 N 70 188.091 W 14936.306
9451 .49 86.40 342.12 5170.41 5089.51 2433.60 6910.81 2297.16 5043.21 2.05 1.52 1.39 5961052.01 617056.93 N 70 188.387 W 14936.592
9482.60 85.92 340.29 5172.49 5091 .59 2462.70 6941.85 2326.54 5033.21 6.07 -1.54 -5.88 5961081.24 617046.50 N 70 188.676 W 14936.883
9514.16 85.95 339.86 5174.73 5093.83 2491.99 6973.33 2356.14 5022.48 1.36 0.10 -1.36 5961110.67 617035.33 N 70 188.967 W 14937.195
9545.39 87.29 339.69 5176.57 5095.67 2520.94 7004.50 2385.39 5011.70 4.33 4.29 -0.54 5961139.75 617024.12 N 70 189.255 W 14937.509
9576.86 88.01 342.61 5177.86 5096.96 2550.41 7035.95 2415.14 5001.55 9.55 2.29 9.28 5961169.35 617013.52 N 70 189.547 W 14937.804
9608.47 88.36 344.01 5178.86 5097.96 2580.41 7067.54 2445.41 4992.47 4.56 1.11 4.43 5961199.47 617004.00 N 70 189.845 W 14938.068
9638.11 88.73 345.25 5179.62 5098.72 2608.76 7097.17 2473.98 4984.62 4.36 1.25 4.18 5961227.92 616995.72 N 70 1810.126 W 14938.297
9669.03 88.32 344.21 5180.41 5099.51 2638.34 7128.08 2503.79 4976.48 3.61 -1.33 -3.36 5961257.61 616987.14 N 70 1810.419 W 14938.533
9700.74 87.64 342.73 5181.53 5100.63 2668.47 7159.77 2534.17 4967.46 5.13 -2.14 -4.67 5961287.85 616977.67 N 70 18 10.718 W 14938796
9731.56 89.18 342.75 5182.39 5101.49 2697.63 7190.58 2563.59 4958.32 5.00 5.00 0.06 5961317.13 616968.09 N 70 1811.008 W 14939.062
9763.02 90.14 341.78 5182.57 5101.67 2727.32 7222.04 2593.56 4948.74 4.34 3.05 -3.08 5961346.94 616958.06 N 70 1811.302 W 14939.340
9793.45 89.76 340.89 5182.60 5101.70 2755.87 7252.47 2622.39 4939.00 3.18 -1.25 -2.92 5961375.62 616947.90 N 70 18 11.586 W 14939.624
9821.84 88.91 338.67 5182.93 5102.03 2782.23 7280.85 2649.02 4929.19 8.37 -2.99 -7.82 5961402.10 616937.69 N 701811.848 W 14939.909
9853.29 88.87 336.78 5183.54 5102.64 2810.99 7312.30 2678.12 491727 6.01 -0.13 -6.01 5961431.02 616925.34 N 701812.134 W 149310.256
9884.24 90.00 337.39 5183.84 5102.94 2839.16 7343.25 2706.62 490522 4.15 3.65 1.97 5961459.34 616912.87 N 701812.415 W 149310.607
9917.15 90.72 338.02 5183.64 5102.74 2869.26 7376.16 2737.07 4892.74 2.91 2.19 1.91 5961489.59 616899.93 N 70 1812.714 W 149310.971
9948.15 89.90 337.84 5183.47 5102.57 2897.66 7407.15 2765.80 4881.09 2.71 -2.65 -0.58 5961518.14 616887.86 N 70 1812.997 W149311.310
9980.22 89.28 337.58 5183.70 5102.80 2926.99 7439.22 2795.47 4868.93 2.10 -1.93 -0.81 5961547.63 616875.26 N 70 1813.289 W 149311.664
10011.87 89.04 338.25 5184.16 5103.26 2955.98 7470.87 2824.80 4857.03 2.25 -0.76 2.12 5961576.77 616862.92 N 70 18 13.577 W 149312.010
10042.63 88.98 339.19 5184.69 5103.79 2984.32 7501.62 2853.46 4845.87 3.06 -0.20 3.06 5961605.26 616851.34 N 70 18 13.859 W 149312.335
10073.21 89.32 338.91 5185.15 5104.25 3012.57 7532.20 2882.01 4834.93 1.44 1.11 -0.92 5961633.64 616839.98 N 70 18 14.140 W 149312.653
10105.32 90.28 340.06 5185.26 5104.36 3042.32 7564.31 2912.08 4823.68 4.67 2.99 3.58 5961663.54 616828.28 N 70 18 14.436 W 1493 12.981
10136.28 91.27 340.47 5184.84 5103.94 3071.17 7595.27 2941 .22 481323 3.46 3.20 1.32 5961692.52 616817.40 N 70 18 14.723 W 149313.285
10166.92 90.48 339.55 5184.37 5103.47 3099.66 7625.90 2970.01 4802.75 3.96 -2.58 -3.00 5961721.15 616806.50 N 70 18 15.006 W 149313.590
10198.16 88.60 338.41 5184.62 5103.72 3128.50 7657.14 2999.17 4791.55 7.04 -6.02 -3.65 5961750.13 616794.86 N 70 18 15.293 W 149313.916
10229.40 87.84 337.35 5185.59 5104.69 3157.10 7688.37 3028.10 4779.79 4.17 -2.43 -3.39 5961778.88 616782.67 N 701815.577 W 149314.259
10261.69 88.02 337.58 5186.76 5105.86 3186.56 7720.64 3057.90 4767.43 0.90 0.56 0.71 5961808.49 616769.86 N 70 18 15.870 W 149314.619
10292.42 88.49 33727 5187.70 5106.80 3214.59 7751.35 3086.26 4755.63 1.83 1.53 -1.01 5961836.67 616757.65 N 70 18 16.149 W 149314.962
10323.44 91.34 336.40 5187.74 5106.84 3242.76 7782.37 3114.78 4743.43 9.61 9.19 -2.80 5961865.00 616745.03 N 70 18 16.430 W 149315.317
10385.00 93.43 336.67 5185.18 5104.28 3298.49 7843.87 3171.20 4718.94 3.42 3.40 0.44 5961921.04 616719.70 N 70 18 16.985 W 149316.030
10416.69 93.54 335.64 5183.25 5102.35 3327.06 7875.50 3200.13 4706.16 3.26 0.35 -3.25 5961949.78 616706.49 N 70 18 17270 W 149316.403
10447.72 93.57 335.39 5181.33 5100.43 3354.89 7906.47 3228.31 4693.32 0.81 0.10 -0.81 5961977. 76 616693.23 N 701817.547 W 149316.776
10478.88 93.37 336.10 5179.44 5098.54 3382.89 7937.58 3256.67 4680.54 2.36 -0.64 228 5962005.92 616680.04 N 70 18 17.826 W149317.148
10510.08 93.50 335.74 5177.57 5096.67 3410.96 7968.72 3285.10 4667.84 1.22 0.42 -1.15 5962034.16 616666.91 N 70 18 18.106 W 149317.518
10572.93 93.54 335.84 5173.72 5092.82 3467.46 8031 .45 3342.32 4642.11 0.17 0.06 0.16 5962090.98 616640.33 N 70 18 18.668 W 149318.267
10603.90 91.79 336.74 5172.28 5091.38 3495.43 8062.39 3370.64 4629.67 6.35 -5.65 2.91 5962119.12 616627.47 N 70 18 18.947 W 149318.630
SurveyEditor Ver 3.1 RT-SP3.03-HF2.03 Bld( d031 rt-546)
W-205\W-205\W-205L 1\W-205L 1
Generated 1/23/2004 1 :24 PM Page 3 of 4
.
.
r Measuroo I Inclination 1 Azimuth 1 TVD I Sub-Sea TVD I Vertical I Along Hole I NS EW I DLS I Build Rate 1 Walk Rate 1 Northing Easting Lat~ude Long~ude
Depth Section Departure
(ft) ( deg) ( deg) (ft) (ft) (ft) ( fl) (ft) (ft) (deg/1ooft) (deg/1ooft) (deg/1ooft) (ftUS) (ftUS)
10628.24 90.72 336.35 5171.74 5090.84 3517.48 8086.72 3392.97 4619.99 4.68 -4.40 -1.60 5962141.29 616617.46 N 70 18 19.167 W 149318.912
v 1 0680.00 90.72 336.35 5171.09 '/5090.19 3564.31 8138.48 3440.37 4599.22 0.00 0.00 0.00 5962188.38 616595.99 N 70 18 19.633 W 149319.516
Leaal DescriDtion:
Surface: 3703 FSL 1197 FEL S21 T11N R12E UM
BHL: 1861 FSL 1870 FEL S15 T11N R12E UM
Northina (y) (ftUS]
5958680.13
5962188.38
Eastinq (X) [ftUS]
612048.97
616595.99
SurveyEditor Ver 3.1 RT-SP3.03-HF2.03 Bld( d031 rt-546 )
W-205\W-205\W-205L 1\W-205L 1
Generated 1/23/2004 1 :24 PM Page 4 of 4
. .
W-205L 1 PB1 Survey Report Schlumberger
Report Date: 16-Dec-04 Survey 1 DLS Computation Method: Minimum Curvature 1 Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 1.560'
Field: Prudhoe Bay Unit· WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure I Slot: W-PAD / W-205 rve Reference Datum: Rotary Table
Well: W-205 rve Reference Elevation: 80.90 ft relative to MSL
Borehole: W·205L1 PB1 Sea Bed I Ground Level Elevation: 52.40 ft relative to MSL
UWVAPI#: 500292316570 Magnetic Declination: 25.221'
Survey Name I Date: W-205L1PB11 December 16. 2003 Total Field Strength: 57559.764 nT
Tort 1 AHD 1 DDII ERD ratio: 287.963' /6742.20 ft 16.543/1.305 Magnetic Dip: 80.809'
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 25, 2003
Location Lat/Long: N 70 17 45.811, W 149 533.633 Magnetic Declination Model: BGGM 2003
Location Grid NIE Y/x: N 5958680.130 ftUS, E 612048.970 ftUS North Reference: True North
Grid Convergence Angle: +0.85420613' Total Carr Mag North -> True North: +25.221 '
Grid Scale Factor: 0.99991426 Local Coordinates Referenced To: Well Head
Measured I Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude
Depth Section Departure
(ft) ( deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) ( deg/1 00 ft ) ( deg/1 00 ft ) ( deg/1 00 ft ) (ftUS) (ftUS)
0.00 0.00 0.00 0.00 -80.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5958680.13 612048.97 N 701745.811 W 149533.633
138.20 0.07 88.07 138.20 57.30 0.01 0.08 0.00 0.08 0.05 0.05 0.00 5958680.13 612049.05 N 701745.811 W 149533.630
239.52 0.61 54.75 239.52 158.62 0.33 0.68 0.32 0.59 0.55 0.53 -32.89 5958680.45 612049.55 N 70 1745.814 W 149533.616
300.39 2.25 63.08 300.37 219.47 1.10 2.20 1.04 1.92 2.71 2.69 13.68 5958681 .20 612050.87 N 701745.821 W 149533.577
390.94 5.17 82.77 390.72 309.82 2.57 8.00 2.36 7.55 3.47 3.22 21.74 5958682.60 612056.48 N 701745.834 W 149533.413
483.11 6.93 92.96 482.38 401.48 3.07 17.69 2.60 17.22 2.23 1.91 11.06 5958682.98 612066.15 N 70 1745.837 W 149533.131
576.06 8.31 96.29 574.50 493.60 2.38 30.01 1.57 29.50 1.56 1.48 3.58 5958682.14 612078.44 N 701745.827 W 149532.773
671.50 10.95 97.11 668.59 587.69 0.93 45.98 -0.31 45.35 2.77 2.77 0.86 5958680.50 612094.32 N 70 1745.808 W 149532.311
765.37 13.56 93.83 760.31 679.41 -0.37 65.90 -2.14 65.19 2.88 2.78 -3.49 5958678.96 612114.17 N 70 1745.790 W 149531.733
859.95 15.67 90.40 851.83 770.93 -0.55 89.75 -2.97 89.02 2.41 2.23 ·3.63 5958678.48 612138.02 N 70 1745.782 W149531.038
954.66 18.74 90.44 942.29 861.39 0.01 117.76 -3.18 117.03 3.24 3.24 0.04 5958678.70 612166.03 N 70 1745.780 W 149530.222
1050.16 23.91 88.55 1031.22 950.32 1.32 152.48 -2.81 151.75 5.46 5.41 -1.98 5958679.58 612200.73 N 70 1745.783 W 149529.210
1144.14 27.46 91.14 1115.91 1035.01 2.48 193.20 -2.76 192.46 3.96 3.78 2.76 5958680.24 612241.44 N 70 1745.784 W 149 5 28.023
1238.39 29.92 90.46 1198.58 1117.68 3.09 238.44 -3.38 237.70 2.63 2.61 -0.72 5958680.30 612286.67 N 70 1745.778 W 149526.704
1333.55 33.56 88.26 1279.50 1198.60 5.06 288.49 -2.77 287.74 4.01 3.83 -2.31 5958681.65 612336.70 N 70 1745.784 W 149525.246
1427.00 38.84 92.23 1354.89 1273.99 6.21 343.65 -3.13 342.89 6.18 5.65 4.25 5958682.12 612391.84 N 70 1745.780 W 149523.639
1521.98 43.73 92.85 1426.24 1345.34 5.12 406.30 -5.92 405.47 5.17 5.15 0.65 5958680.26 612454.45 N 70 1745.753 W 149521.814
1616.01 45.76 92.04 1493.02 1412.12 4.11 472.49 -8.73 471.60 2.24 2.16 -0.86 5958678.43 612520.61 N 70 1745.725 W 149519.887
1709.89 45.49 93.10 1558.68 1477.78 2.93 539.59 -11.74 538.64 0.86 -0.29 1.13 5958676.42 612587.67 N 70 1745.695 W 149517.933
1803.35 44.15 92.96 1624.97 1544.07 1.24 605.47 -15.22 604.42 1.44 -1.43 -0.15 5958673.92 612653.50 N 70 1745.661 W 149516.016
1898.67 42.83 93.34 1694.12 1613.22 -0.58 671.07 -18.83 669.92 1.41 -1.38 0.40 5958671.29 612719.04 N 70 1745.626 W 149514.106
1992.58 4202 93.80 1763.44 1682.54 -2.80 734.42 -22.77 733.15 0.92 -0.86 0.49 5958668.29 612782.32 N 70 1745.587 W 149512.263
2087.21 41.64 93.69 1833.96 1753.06 -5.21 797.53 -26.89 796.13 0.41 -0.40 -0.12 5958665.11 612845.34 N 70 17 45.546 W 149510.428
218202 42.33 93.42 1904.43 1823.53 -7.42 860.95 -30.82 859.43 0.75 0.73 -0.28 5958662.12 612908.69 N 70 1745.507 W 149 5 8.583
2276.41 41.86 9301 1974.47 1893.57 -9.24 924.23 -34:37 922.60 0.58 -0.50 -0.43 5958659.52 612971.90 N 701745.472 W 149 5 6.741
2371 .24 43.94 92.92 2043.93 1963.03 -10.83 988.78 -37.71 987.07 2.19 2.19 -0.09 5958657.14 613036.40 N 701745.440 W 149 54.863
2465.72 44.80 90.69 2111.47 2030.57 -11.10 1054.84 -39.78 1053.09 1.88 0.91 -2.36 5958656.05 613102.45 N701745.419 W 149 5 2.938
2560.07 44.84 89.82 2178.40 2097.50 -9.58 1121.34 -40.08 1119.60 0.65 0.04 -0.92 5958656.75 613168.94 N 701745.416 W 14951.000
2654.53 44.98 90.34 2245.30 2164.40 -7.86 1188.03 -40.17 1186.28 0.42 0.15 0.55 5958657.65 613235.62 N701745.415 W 149459.056
2750.20 44.95 90.82 2312.99 2232.09 -6.71 1255.64 -40.86 1253.89 0.36 -0.03 0.50 5958657.97 613303.22 N 70 1745.408 W 149457.085
2845.05 44.48 90.47 2380.39 2299.49 -5.64 1322.37 -41.61 1320.62 0.56 -0.50 -0.37 5958658.22 613369.95 N 70 1745.401 W 149455.140
2940.21 44.54 87.54 2448.26 2367.36 -2.67 1389.08 -40.45 1387.30 2.16 0.06 -3.08 5958660.37 613436.60 N 70 1745.412 W 149453.197
3034.42 44.39 87.64 2515.49 2434.59 1.90 1455.07 -37.67 1453.24 0.18 -0.16 0.11 5958664.13 613502.48 N 70 1745.439 W 149451.275
3129.22 44.11 87.91 2583.40 2502.50 6.27 1521.22 -35.11 1519.34 0.36 -0.30 0.28 5958667.68 613568.53 N 70 1745.464 W 149449.348
3221.57 44.52 88.27 2649.48 2568.58 10.17 1585.74 -32.96 1583.82 0.52 0.44 0.39 5958670.79 613632.96 N 70 1745.485 W 149447.469
3315.03 44.46 88.48 2716.15 2635.25 13.81 1651.23 -31.10 1649.29 0.17 -0.06 0.22 5958673.62 613698.39 N 70 1745.503 W 149445.561
3409.53 44.42 88.46 2783.62 2702.72 17.38 1717.40 -29.33 1715.43 0.04 -0.04 -0.02 5958676.38 613764.49 N 70 1745.521 W 149443.633
3504.53 44.80 88.89 2851.25 2770.35 20.74 1784.11 -27.79 1782.13 0.51 0.40 0.45 5958678.91 613831.16 N 70 1745.536 W 149441.689
3598.91 45.06 89.18 2918.07 2837.17 23.67 1850.77 -26.67 1848.77 0.35 0.28 0.31 5958681.03 613897.77 N 70 1745.547 W 149439.746
3694.74 46.75 88.01 2984.75 2903.85 27.24 1919.59 -24.97 1917.57 1.97 1.76 -1.22 5958683.75 613966.53 N 70 1745.563 W 149437.741
3788.33 46.72 88.07 3048.90 2968.00 31.43 1987.74 -22.64 1985.68 0.06 -0.03 0.06 5958687.10 614034.59 N 70 1745.586 W 149435.756
3882.04 48.58 88.49 3112.02 3031.12 35.39 2056.99 -20.56 2054.90 2.01 1.98 0.45 5958690.20 614103.77 N 70 17 45.606 W 149433.738
3935.59 49.24 88.61 3147.22 3066.32 37.50 2097.35 -19.54 2095.25 1.24 1.23 0.22 5958691.82 614144.09 N 701745.616 W 149432.562
4029.51 47.87 88.73 3209.38 3128.48 41.05 2167.75 -17.91 2165.63 1.46 -1.46 0.13 5958694.51 614214.44 N 70 1745.632 W 149430.511
4125.83 47.53 88.86 3274.21 3193.31 44.49 2238.99 -16.41 2236.86 0.37 -0.35 0.13 5958697.07 614285.63 N 70 1745.646 W 149428.435
4219.70 47.06 88.57 3337.87 3256.97 47.91 2307.97 -14.86 2305.82 0.55 -0.50 -0.31 5958699.64 614354.55 N 701745.661 W 149 4 26.424
4313.18 47.50 90.07 3401.29 3320.39 50.60 2376.65 -14.05 2374.49 1.27 0.47 1.60 5958701 .48 614423.19 N 70 17 45.669 W 149424.423
4408.39 49.25 90.60 3464.53 3383.63 52.11 2447.82 -14.47 2445.65 1.88 1.84 0.56 5958702.12 614494.35 N 70 1745.665 W 149422.349
4502 06 49.19 90.52 3525.71 3444.81 53.35 2518.74 -15.17 2516.58 0.09 -0.06 -0.09 5958702.48 614565.27 N 70 1745.658 W 149420.281
4596.92 48.95 90.38 3587.86 3506.96 54.74 2590.41 -15.73 2588.24 0.28 -0.25 -0.15 5958702.99 614636.93 N 70 17 45.652 W 149418.193
SUNeyEdifor Ver 3.1 RT-SP3.03-HF2.03 Bld( d031 rt-546)
W-205\W-205\W-205L 1 PB1\W-205L 1 PB1
Generated 1/23/2004 1 :24 PM Page 1 of 3
. .
r Measured I Inclination I Azimuth 1 rVD 1 Sub-Sea rVD I Vertical I Along Hole 1 NS EW 1 DLS I Build Rate 1 Walk Rate I Northing Easting Latitude Longitude
Depth Section Departure
(n) (deg) ( deg) (It) (It) (n) (It) (It) (n) (deg/1OOft) (deg/1oolt) (deg/1oolt) (ItUS) (ItUS)
4692.21 48.79 90.24 3650.54 3569.64 56.30 2662.19 -16.12 2660.02 0.20 -0.17 -0.15 5958703.67 614708.70 N 70 1745.648 W149416.101
4786.94 48.40 89.75 3713.19 3632.29 58.24 2733.24 -16.11 2731.07 0.57 -0.41 -0.52 5958704.73 614779.74 N 70 17 45.648 W 149414.030
4881 .27 47.90 89.49 3776.13 3695.23 60.62 2803.50 -15.65 2801 .33 0.57 -0.53 -0.28 5958706.25 614849.98 N 70 17 45.652 W 1494 11.982
4976.33 47.54 89.45 3840.08 3759.18 63.19 2873.84 -15.00 2871.66 0.38 -0.38 -0.04 5958707.94 614920.28 N 70 1745.658 W 14949.932
5070.70 47.15 89.05 3904.02 3823.12 65.98 2943.24 -14.09 2941.06 0.52 -0.41 -0.42 5958709.89 614989.66 N 70 17 45.667 W 14947.909
5164.92 46.92 88.98 3968.24 3887.34 69.05 3012.19 -12.90 3010.00 0.25 -0.24 -0.07 5958712.10 615058.56 N 70 1745.678 W 14945.900
5260.11 47.44 91.19 4032.94 3952.04 70.84 3082.00 -13.01 3079.81 1.79 0.55 2.32 5958713.03 615128.36 N 70 1745.677 W 14943.865
5353.62 47.09 90.56 4096.40 4015.50 71.66 3150.69 -14.06 3148.48 0.62 -0.37 -0.67 5958713.00 615197.04 N 70 1745.666 W 14941.863
5448.04 46.84 90.99 4160.84 4079.94 72.60 3219.70 -15.00 3217.49 0.43 -0.26 0.46 5958713.10 615266.05 N 70 1745.657 W 149359.852
5542.45 47.35 93.52 4225.11 4144.21 71.76 3288.85 -17.72 3286.58 2.04 0.54 2.68 5958711.40 615335.16 N 70 17 45.630 W 149357.838
5637.51 48.32 97.51 4288.94 4208.04 66.88 3359.30 -24.51 3356.69 3.27· 1.02 4.20 5958705.66 615405.35 N 70 17 45.563 W 149355.795
5730.86 48.49 102.79 4350.93 4270.03 56.46 3429.09 -36.81 3425.36 4.23 0.18 5.66 5958694.39 615474.20 N 70 1745.441 W 149353.793
5827.15 48.36 104.32 4414.83 4333.93 41.49 3501.12 -53.69 3495.38 1.20 -0.14 1.59 5958678.56 615544.46 N 70 17 45.275 W 149351.752
5922.20 47.21 99.09 4478.72 4397.82 29.07 3571 .49 -67.99 3564.26 4.25 -1.21 -5.50 5958665.29 615613.54 N 70 1745.134 W 149349.745
6018.20 47.43 95.71 4543.81 4462.91 21.89 3642.06 -77.07 3634.23 2.60 0.23 -3.52 5958657.25 615683.63 N 70 1745.044 W 149347.706
6113.56 49.51 92.20 4607.04 4526.14 18.95 3713.43 -81.96 3705.42 3.51 2.18 -3.68 5958653.42 615754.88 N 70 17 44.996 W 149345.631
6207.77 51.06 88.79 4667.25 4586.35 20.32 3785.89 -82.56 3777.87 3.23 1.65 -3.62 5958653.90 615827.32 N 701744.990 W 149343.519
6301.13 54.14 83.06 4723.98 4643.08 27.67 3860.02 -77.22 3851.78 5.89 3.30 -6.14 5958660.34 615901.14 N 701745.042 W 149341.365
6393.40 55.11 76.89 4777.43 4696.53 42.79 3935.23 -64.11 3925.80 5.55 1.05 -6.69 5958674.55 615974.95 N 70 1745.170 W 149339.207
6486.61 56.60 71.66 4829.77 4748.87 65.73 4012.36 -43.19 4000.01 4.91 1.60 -5.61 5958696.58 616048.82 N 70 17 45.376 W 149337.044
6582.21 60.06 67.40 4879.97 4799.07 96.28 4093.70 -14.69 4076.17 5.24 3.62 -4.46 5958726.20 616124.55 N 70 17 45.656 W 149 3 34.824
6676.53 63.26 62.27 4924.76 4843.86 133.64 4176.69 20.64 4151.24 5.87 3.39 -5.44 5958762.64 616199.08 N 70 17 46.003 W 149332.635
6771.35 64.85 57.71 4966.26 4885.36 178.28 4261.94 63.28 4225.03 4.64 1.68 -4.81 5958806.38 616272.22 N 70 17 46.422 W 149330.483
6865.05 65.91 55.97 5005.30 4924.40 226.80 4347.12 109.88 4296.33 2.03 1.13 -1.86 5958854.03 616342.81 N 70 17 46.880 W 149328.404
6958.08 68.13 53.24 5041.62 4960.72 278.29 4432.76 159.49 4366.13 3.60 2.39 -2.93 5958904.67 616411.85 N 70 1747.367 W 149326.369
7052.54 70.37 52.60 5075.09 4994.19 333.45 4521.09 212.75 4436.59 2.45 2.37 -0.68 5958958.97 616481.51 N 70 17 47.891 W 149324.314
7147.59 73.28 51.97 5104.73 5023.83 390.62 4611.39 267.99 4508.02 3.13 3.06 -0.66 5959015.27 616552.10 N 70 17 48.433 W 149322.231
7173.00 73.97 52.13 5111.90 5031.00 406.13 4635.76 282.98 4527.25 2.78 2.72 0.63 5959030.54 616571.10 N 70 17 48.581 W 149321.671
7185.00 75.84 51.68 5115.02 5034.12 413.52 4647.35 290.13 4536.36 16.00 15.58 -3.75 5959037.82 616580.11 N 70 17 48.651 W 149321.405
7210.58 79.48 50.92 5120.49 5039.59 429.67 4672.34 305.75 4555.86 14.52 14.23 -2.97 5959053.73 616599.37 N 70 1748.805 W 149320.836
7242.00 85.05 50.00 5124.72 5043.82 450.13 4703.46 325.57 4579.86 17.96 17.73 -2.93 5959073.90 616623.07 N 70 1748.999 W 149320.136
7273.10 84.97 49.10 5127.42 5046.52 470.86 4734.44 345.67 4603.44 2.89 -0.26 -2.89 5959094.35 616646.34 N 70 17 49.197 W 149319.449
7304.49 84.70 48.20 5130.25 5049.35 492.15 4765.70 366.32 4626.90 2.98 -0.86 -2.87 5959115.35 616669.49 N 70 17 49.400 W 149318.764
7336.33 86.29 47.29 5132.75 5051.85 514.12 4797.44 387.66 4650.40 5.75 4.99 -2.86 595913704 616692.66 N 70 17 49.610 W 149318.079
7367.07 89.01 46.42 5134.01 5053.11 535.72 4828.15 408.66 4672.80 9.29 8.85 -2.83 5959158.37 616714.75 N 70 17 49.816 W 149317.426
7398.19 88.70 45.45 5134.63 5053.73 557.96 4859.27 430.30 4695.16 3.27 -1.00 -3.12 5959180.34 616736.78 N 70 17 50.029 W 149316.774
7429.37 87.19 44.67 5135.75 5054.85 580.57 4890.43 452.31 4717.22 5.45 -4.84 -2.50 5959202.67 616758.51 N 70 17 50.245 W 149316.130
7460.79 87.37 43.79 5137.24 5056.34 603.64 4921.81 474.80 4739.11 2.86 0.57 -2.80 5959225.48 616780.06 N 70 17 50.466 W 149315.492
7491.33 87.98 43.46 5138.48 5057.58 626.30 4952.33 496.89 4760.16 2.27 2.00 -1.08 5959247.88 616800.78 N 70 17 50.683 W 149314.878
7522.92 87.92 41.20 5139.61 5058.71 650.20 4983.90 520.23 4781.42 7.15 -0.19 -7.15 5959271.53 616821.68 N 70 17 50.912 W 149314.258
7554.45 88.22 39.10 5140.67 5059.77 674.83 5015.41 544.31 4801.74 6.72 0.95 -6.66 5959295.91 616841.64 N 70 17 51.149 W 149313.665
7585.32 88.33 39.00 5141.60 5060.70 699.31 5046.26 568.27 4821.18 0.48 0.36 -0.32 5959320.16 616860.72 N 70 1751.385 W 149313.098
7616.11 88.74 39.36 5142.39 5061 .49 723.69 5077.04 592.13 4840.62 1.77 1.33 117 5959344.31 616879.80 N 70 17 51.619 W 149312.531
7647.03 89.15 39.79 5142.96 5062.06 748.05 5107.96 615.96 4860.32 1.92 1.33 1.39 5959368.42 616899.14 N 70 1751.854 W149311.956
7678.89 89.63 40.06 5143.29 5062.39 773.03 5139.82 640.39 4880.76 1.73 1.51 0.85 5959393.15 616919.22 N 70 17 52.094 W149311.360
7708.77 87.81 38.68 5143.96 5063.06 796.63 5169.69 663.49 4899.71 7.64 -6.09 -4.62 5959416.52 616937.82 N 70 17 52.321 W 149310.807
7739.93 87.30 38.00 5145.29 5064.39 821.56 5200.82 687.90 4919.02 2.73 -1.64 -2.18 5959441 .22 616956.76 N 70 1752.561 W 149310.243
7771.17 89.32 41.27 5146.21 5065.31 846.14 5232.04 711.95 4938.94 12.30 6.47 10.47 5959465.56 616976.31 N 70 1752.797 W 14939.662
7802.67 89.53 43.02 5146.53 5065.63 870.06 5263.54 735.30 4960.07 5.60 0.67 5.56 5959489.22 616997.10 N 70 1753.027 W 14939.046
7833.60 87.20 43.49 5147.41 5066.51 893.14 5294.46 757.82 4981 .26 7.68 -7.53 1.52 5959512.05 617017.94 N 70 1753.246 W 14938.428
7864.14 87.51 44.15 5148.82 5067.92 915.72 5324.96 779.83 5002.38 2.39 1.02 2.16 5959534.37 617038.73 N 70 1753.4&<11 W 14937.812
7895.81 89.25 41.37 5149.72 5068.82 939.54 5356.62 803.07 5023.87 10.35 5.49 -8.78 5959557.93 617059.87 N 70 17 53.693 W 14937.185
7927.18 91.07 37.95 5149.63 5068.73 964.22 5387.99 827.21 5043.89 12.35 5.80 -10.90 5959582.37 617079.52 N 70 17 53.930 W 14936.601
7957.67 90.32 34.57 5149.26 5068.36 989.28 5418.48 851.79 5061.92 11.35 -2.46 -11.09 5959607.21 617097.18 N 70 17 54.172 W 14936.075
7989.08 87.37 31.57 5149.89 5068.99 1016.05 5449.88 878.10 5079.05 13.39 ·9.39 -9.55 5959633.77 617113.92 N 70 17 54.430 W 14935.575
8020.04 84.96 29.06 5151.96 5071.06 1043.13 5480.77 904.77 5094.64 11.23 -7.78 -8.11 5959660.66 617129.11 N 70 17 54.692 W 14935.120
8051.30 82.89 25.77 5155.27 5074.37 1071.09 5511.85 932.35 5108.95 12.38 -6.62 -10.52 5959688.46 617143.01 N 70 17 54.964 W 14934.702
8081.97 82.92 21.95 5159.06 5078.16 1 099.25 5542.28 960.18 5121.26 12.36 0.10 -12.46 5959716.46 617154.90 N 70 17 55.237 W 14934.343
8112.68 87.57 21.85 5161.61 5080.71 1127.93 5572.88 988.57 5132.67 15.15 15.14 -0.33 5959745.02 617165.88 N 701755.516 W 14934.010
8144.29 92.55 19.28 5161.57 5080.67 1157.81 5604 .48 1018.15 5143.77 17.73 15.75 -8.13 5959774.76 617176.54 N 70 17 55.807 W 14933.685
8174.58 94.95 17.85 5159.59 5078.69 1186.71 5634.70 1046.80 5153.39 9.22 7.92 -4.72 5959803.55 617185.73 N 70 17 56.089 W 14933.404
8206.59 95.30 18.52 5156.73 5075.83 1217.26 5666.58 1077.09 5163.34 2.35 1.09 2.09 5959833.98 617195.23 N 70 17 56.387 W 14933.114
8237.07 94.81 17.43 5154.05 5073.15 1246.38 5696.95 1105.97 5172.71 3.91 -1.61 -3.58 5959862.99 617204.17 N 70 17 56.671 W 14932.840
8268.80 92.65 14.51 5151.98 5071.08 1277.04 5728.61 1136.41 5181.42 11.43 -6.81 -9.20 5959893.55 617212.42 N 70 17 56.970 W 14932.585
8299.98 90.73 13.87 5151.06 5070.16 1307.46 5759.77 1166.62 5189.06 6.49 -6.16 -2.05 5959923.87 617219.61 N 701757.267 W 14932.362
8330.99 89.29 11.11 5151.06 5070.16 1337.90 5790.78 1196.89 5195.77 10.04 -4.64 -8.90 5959954.24 617225.86 N 70 1757.565 W 14932.166
8362.75 89.56 9.75 5151.38 5070.48 1369.28 5822.54 1228.13 5201.52 4.37 0.85 -4.28 5959985.55 617231.14 N 70 17 57.872 W 14931.998
8393.91 89.53 8.65 515162 5070.72 1400.16 5853.70 1258.88 5206.50 3.53 -0.10 -3.53 5960016.38 617235.67 N 70 17 58.1741 W 14931.852
8424.61 90.11 7.82 5151.72 5070.82 1430.65 5884.40 1289.27 5210.90 3.30 1.89 -2.70 5960046.82 617239.61 N 70 1758.473 W 14931.723
SurveyEditor Ver 3.1 RT-SP3.03-HF2.03 Bld( d031 rt-546 )
W·205\W-205\W-205L 1 PB1\W-205L 1 PB1
Generated 1/23/2004 1 :24 PM Page 201 3
. .
r Measur~ 1 Inclination I Azimuth I rVD I Sub-Sea rVD I Vertical I Along Hole I NS EW I DLS 1 Build Rate 1 Walk Rate I Northing Easting Latnude Longnude
Depth Section Departure
(ft) (deg) (deg) (h) (ft) (h) (h) (ft) (h) (deg/100h) (deg/100h) (degl100h) (hUS) (hUS)
8455.34 91.11 7.02 5151.39 5070.49 1461.22 5915.13 1319.74 5214.86 4.17 3.25 -2.60 5960077.34 617243.12 N 70 1758.773 W 14931.607
8486.53 91.11 4.31 5150.79 5069.89 1492.32 5946.31 1350.77 5217.94 8.69 0.00 -8.69 5960108.41 617245.74 N 70 1759.078 W 14931.516
8517.51 91.31 0.54 5150.13 5069.23 1523.28 5977.28 1381.71 5219.25 12.18 0.65 -12.17 5960139.36 617246.59 N 70 1759.382 W14931.478
8547.81 91.14 357.91 5149.49 5068.59 1553.55 6007.58 1411.99 5218.84 8.70 -0.56 -8.68 5960169.64 617245.73 N 70 17 59.680 W14931.489
8579.70 92.44 355.48 5148.49 5067.59 1585.30 6039.45 1443.81 5217.00 8.64 4.08 -7.62 5960201 .42 617243.41 N 70 1759.993 W 14931.542
8610.28 92.86 354.68 5147.08 5066.18 1615.66 6070.00 1474.25 5214.38 2.95 1.37 -2.62 5960231.81 617240.34 N 70180.292 W14931.618
8641.67 92.65 353.53 5145.57 5064.67 1646.74 6101.35 1505.43 5211.16 3.72 -0.67 -3.66 5960262.95 617236.66 N 70180.599 W 14931.711
8673.29 92.89 351.46 5144.04 5063.14 1677.93 6132.93 1536.75 5207.04 6.58 0.76 -6.55 5960294.19 617232.07 N 70 180.907 W 14931.831
8703.98 92.20 350.64 5142.68 5061.78 1708.08 6163.59 1567.03 5202.27 3.49 -2.25 -2.67 5960324.40 617226.85 N 70 18 1.205 W 14931.969
8735.16 91.45 348.10 5141.68 5060.78 1738.53 6194.76 1597.66 5196.52 8.49 -2.41 -8.15 5960354.93 617220.64 N 70 18 1.506 W 14932.136
8765.78 90.28 347.09 5141.22 5060.32 1768.25 6225.37 1627.56 5189.94 5.05 -3.82 -3.30 5960384.73 617213.62 N 70 18 1.800 W 14932.327
8796.49 90.49 348.37 5141.01 5060.11 1798.06 6256.08 1657.57 5183.42 4.22 0.68 4.17 5960414.63 617206.65 N 70 182.095 W 14932.517
8827.80 88.95 347.05 5141.17 5060.27 1828.46 6287.39 1688.16 5176.75 6.48 -4.92 -4.22 5960445.12 617199.53 N 70 182.396 W 14932.710
8859.60 89.97 344.16 5141.47 5060.57 1859.03 6319.19 1718.95 5168.85 9.64 3.21 -9.09 5960475.79 617191.17 N 70182.699 W 14932.940
8890.19 92.24 341.55 5140.88 5059.98 1888.00 6349.77 1748.17 5159.84 11.31 7.42 -8.53 5960504.87 617181.72 N 70182.987 W 14933.202
8921 .45 91.69 340.30 5139.81 5058.91 1917.23 6381.01 1777.70 5149.63 4.37 -1.76 ·4.00 5960534.24 617171.07 N 70183.277 W 14933.500
8953.00 91.31 342.25 5138.98 5058.08 1946.81 6412.55 1807.57 5139.50 6.29 -1.20 6.18 5960563.95 617160.50 N 70 183.571 W 14933.794
8983.76 87.85 344.21 5139.21 5058.31 1976.01 6443.31 1837.01 5130.63 12.93 -11.25 6.37 5960593.26 617151.19 N 70 18 3.861 W 14934.052
9014.68 84.96 344.90 5141.14 5060.24 2005.51 6474.16 1866.75 5122.41 9.61 -9.35 2.23 5960622.87 617142.53 N 70 184.153 W 14934.291
9045.65 84.58 347.66 5143.97 5063.07 2035.26 6505.00 1896.71 5115.10 8.96 -1.23 8.91 5960652.72 617134.77 N 70 184.448 W 14934.504
9076.92 85.07 348.84 5146.79 5065.89 2065.57 6536.15 1927.20 5108.75 4.07 1.57 3.77 5960683.10 617127.98 N 70 184.748 W 14934.688
9108.02 85.27 348.30 5149.41 5068.51 2095.76 6567.13 1957.58 5102.61 1.85 0.64 -1.74 5960713.38 617121.39 N 70 18 5.047 W 14934.867
9138.50 85.72 348.28 5151.80 5070.90 2125.34 6597.52 1987.33 5096.45 1.48 1.48 -0.07 5960743.04 617114.78 N 70 18 5.339 W 14935.046
9170.04 86.06 348.51 5154.06 5073.16 2155.97 6628.98 2018.15 5090.12 1.30 1.08 0.73 5960773.75 617107.99 N 70 185.642 W 14935.230
9201.20 84.13 348.78 5156.73 5075.83 2186.23 6660.02 2048.58 5084.01 6.25 -6.19 0.87 5960804.09 617101.43 N 70 185.942 W 14935.407
9232.53 82.72 348.52 5160.31 5079.41 2216.57 6691.15 2079.10 5077.88 4.58 -4.50 -0.83 5960834.51 617094.85 N 70 186.242 W 14935.585
9284.00 82.72 348.52 5166.83 5085.93 2266.30 6742.20 2129.13 5067.72 0.00 0.00 000 5960864.38 617083.94 N 70186.734 W 14935.881
Leaal Description:
Northina IY) [ftUS] Eastina IX) [ftUS]
Surface: 3703FSL 1197FELS21 T11N R12E UM 5958680.13 612048.97
BHL: 550 FSL 1404 FEL S15 T11N R12E UM 5960884.38 617083.94
SurveyEditor Ver 3.1 RT-SP3.03-HF2.03 Bld( d031 rt-546)
W-205\W-205\W-205L 1 PB1\W-205L 1 PB1
Generated 1/23/2004 1 :24 PM Page 3 of 3
SCHLUMBERGER
Survey report
Client...................: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . . .: Polaris
Well. . . . . . . . . . . . . . . . . . . . .: W-205 Ll
API number.. . . . . . . . . . . . . .: 50-029-23165-60
Engineer. . . . . . . . . . . . . . . . .: Etienne Roux
RIG: . . . . . . . . . . . . . . . . . . . . .: NABORS 9ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS...........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: MEAN SEA LEVEL
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 52.4 ft
KB above permanent.......: N/A Top Drive
DF above permanent.......: 80.90 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: N 70 17 45.811
Departure (+E/W-)........: W 149 05 33.633
Azimuth from rotary table to target:
1.56 degrees
[(c)2003 IDEAL ID8_1C_Ol]
ç~~~~~
2)G3-C)C)\
17-Dec-2003 21:22:57
Page
1 of 8
Spud date.......... ......:
Last survey date..... ....:
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
13-Dec-2003
17-Dec-03
189
0.00 ft
10680.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model... ........: BGGM version 2003
Magnetic date. ..... ......: Il-Dec-2003
Magnetic field strength..: 1151.20 HCNT
Magnetic dec (+E/W-).....: 25.24 degrees
Magnetic dip.............: 80.81 degrees
----- MWD survey Reference Criteria ---------
Reference G.... ..........: 1002.68 mGal
Reference H..... ..... ....: 1151.20 HCNT
Reference Dip............: 80.81 degrees
Tolerance of G...........: (+/-) 2.50 mGal
Tolerance of H...........: (+/-) 6.00 HCNT
Tolerance of Dip.........: (+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 25.24 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-). ...: 25.24 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
.
RECEIVED
,,-.,
... A 00'''' A
, ., !' ,', V,I..
¡ t... 0 (.. "+
'. . f'," ø ~ 1".... Co iIwoLo.
f1,¡~~a ",!i! Y! ",as wrlS. mmlÐGl\lß
tJî~orage
SCHLUMBERGER Survey Report
17-Dec-2003 21:22:57
Page
2 of 8
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
1
2
3
4
5
0.00
138.20
239.52
300.39
390.94
6
7
8
9
10
483.11
576.06
671.50
765.37
859.95
11
12
13
14
15
954.66
1050.16
1144.14
1238.39
1333.55
16
17
18
19
20
1427.00
1521.98
1616.01
1709.89
1803.35
21
22
23
24
25
1898.67
1992.58
2087.21
2182.02
2276.41
26
27
28
29
30
2371.24
2465.72
2560.07
2654.53
2750.20
0.00
0.07
0.61
2.25
5.17
6.93
8.31
10.95
13.56
15.67
18.74
23.91
27.46
29.92
33.56
38.84
43.73
45.76
45.49
44.15
42.83
42.02
41.64
42.33
41.86
43.94
44.80
44.84
44.98
44.95
0.00
88.07
54.75
63.08
82.77
92.96
96.29
97.11
93.83
90.40
90.44
88.55
91.14
90.46
88.26
92.23
92.85
92.04
93.10
92.96
93.34
93.80
93.69
93.42
93.01
92.92
90.69
89.82
90.34
90.82
[(c)2003 IDEAL ID8_1C_01]
0.00
138.20
101.32
60.87
90.55
92.17
92.95
95.44
93.87
94.58
94.71
95.50
93.98
94.25
95.16
93.45
94.98
94.03
93.88
93.46
95.32
93.91
94.63
94.81
94.39
94.83
94.48
94.35
94.46
95.67
0.00
138.20
239.52
300.37
390.72
482.38
574.50
668.59
760.31
851.83
942.29
1031.22
1115.91
1198.58
1279.50
1354.89
1426.24
1493.02
1558.68
1624.97
1694.12
1763.44
1833.96
1904.43
1974.47
2043.93
2111.47
2178.40
2245.30
2312.99
0.00
0.01
0.33
1.10
2.57
3.07
2.38
0.93
-0.37
-0.55
0.01
1. 32
2.48
3.09
5.06
6.21
5.12
4.11
2.93
1. 24
-0.58
-2.80
-5.21
-7.42
-9.24
-10.83
-11.10
-9.58
-7.86
-6.71
0.00
0.00
0.32
1. 04
2.36
2.60
1. 57
-0.31
-2.14
-2.97
-3.18
-2.81
-2.76
-3.38
-2.77
-3.13
-5.92
-8.73
-11.74
-15.22
-18.83
-22.77
-26.89
-30.82
-34.37
-37.71
-39.78
-40.08
-40.17
-40.86
0.00
0.08
0.59
1. 92
7.55
17.22
29.50
45.35
65.19
89.02
11 7.03
151.75
192.46
237.70
287.74
342.89
405.47
471.60
538.64
604.42
669.92
733.15
796.13
859.43
922.60
987.07
1053.09
1119.60
1186.28
1253.89
0.00
0.08
0.67
2.18
7.91
17.42
29.54
45.36
65.22
89.07
117.08
151.77
192.48
237.73
287.76
342.90
405.52
471.68
538.76
604.61
670.19
733.51
796.58
859.98
923.24
987.79
1053.84
1120.31
1186.96
1254.55
0.00
88.07
61.68
61. 42
72.62
81.42
86.95
90.39
91. 88
91.91
91.56
91. 06
90.82
90.81
90.55
90.52
90.84
91.06
91. 25
91.44
91.61
91.78
91.93
92.05
92.13
92.19
92.16
92.05
91. 94
91. 87
DLS
(deg/
100f)
0.00
0.05
0.55
2.71
3.47
2.23
1. 56
2.77
2.88
2.41
3.24
5.46
3.96
2.63
4.01
6.18
5.17
2.24
0.86
1.44
1. 41
0.92
0.41
0.75
0.58
2.19
1. 88
0.65
0.42
0.36
------
------
Srvy Tool
tool Corr
type (deg)
------
------
Surface Tie-In
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
SCHLUMBERGER Survey Report
17-Dec-2003 21:22:57
Page
3 of 8
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
31
32
33
34
35
2845.05
2940.21
3034.42
3129.22
3221.57
36
37
38
39
40
3315.03
3409.53
3504.53
3598.91
3694.74
41
42
43
44
45
3788.33
3882.04
3935.59
4029.51
4125.83
46
47
48
49
50
4219.70
4313.18
4408.39
4502.06
4596.92
51
52
53
54
55
4692.21
4786.94
4881.27
4976.33
5070.70
56
57
58
59
60
5164.92
5260.11
5353.62
5448.04
5542.45
44.48
44.54
44.39
44.11
44.52
44.46
44.42
44.80
45.06
46.75
46.72
48.58
49.24
47.87
47.53
47.06
47.50
49.25
49.19
48.95
48.79
48.40
47.90
47.54
47.15
46.92
47.44
47.09
46.84
47.35
90.47
87.54
87.64
87.91
88.27
88.48
88.46
88.89
89.18
88.01
88.07
88.49
88.61
88.73
88.86
88.57
90.07
90.60
90.52
90.38
90.24
89.75
89.49
89.45
89.05
88.98
91.19
90.56
90.99
93.52
[(c)2003 IDEAL ID8_1C_01]
94.85
95.16
94.21
94.80
92.35
93.46
94.50
95.00
94.38
95.83
93.59
93.71
53.55
93.92
96.32
93.87
93.48
95.21
93.67
94.86
95.29
94.73
94.33
95.06
94.37
94.22
95.19
93.51
94.42
94.41
2380.39
2448.26
2515.49
2583.40
2649.48
2716.15
2783.62
2851.25
2918.07
2984.75
3048.90
3112.02
3147.22
3209.38
3274.21
3337.87
3401.29
3464.53
3525.71
3587.86
3650.54
3713.19
3776.13
3840.08
3904.02
3968.24
4032.94
4096.40
4160.84
4225.11
-5.64
-2.67
1. 90
6.27
10.17
13.81
17.38
20.74
23.67
27.24
31. 43
35.39
37.50
41. 05
44.49
47.91
50.60
52.11
53.35
54.74
56.30
58.24
60.62
63.19
65.98
69.05
70.84
71.66
72.60
71.76
-41.61
-40.45
-37.67
-35.11
-32.96
-31.10
-29.33
-27.79
-26.67
-24.97
-22.64
-20.56
-19.54
-17.91
-16.41
-14.86
-14.05
-14.47
-15.17
-15.73
-16.12
-16.11
-15.65
-15.00
-14.09
-12.90
-13.01
-14.06
-15.00
-17.72
1320.62
1387.30
1453.24
1519.34
1583.82
1649.29
1715.43
1782.13
1848.77
1917.57
1985.68
2054.90
2095.25
2165.63
2236.86
2305.82
2374.49
2445.65
2516.58
2588.24
2660.02
2731.07
2801. 33
2871.66
2941.06
3010.00
3079.81
3148.48
3217.49
3286.58
1321.27
1387.89
1453.73
1519.74
1584.16
1649.58
1715.68
1782.34
1848.96
1917.73
1985.81
2055.01
2095.34
2165.70
2236.92
2305.87
2374.53
2445.70
2516.62
2588.29
2660.07
2731.12
2801. 3 8
2871.70
2941.09
3010.02
3079.84
3148.52
3217.53
3286.63
91.80
91.67
91. 49
91. 32
91.19
91.08
90.98
90.89
90.83
90.75
90.65
90.57
90.53
90.47
90.42
90.37
90.34
90.34
90.35
90.35
90.35
90.34
90.32
90.30
90.27
90.25
90.24
90.26
90.27
90.31
DLS
(deg/
100f)
0.56
2.16
0.18
0.36
0.52
0.17
0.04
0.51
0.35
1. 97
0.06
2.01
1.24
1. 46
0.37
0.55
1. 27
1. 88
0.09
0.28
0.20
0.57
0.57
0.38
0.52
0.25
1. 79
0.62
0.43
2.04
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
SCHLUMBERGER Survey Report
17-Dec-2003 21:22:57
Page
4 of 8
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
-------- ------ ------- ------
-------- ------ ------- ------
61
62
63
64
65
5637.51
5730.86
5827.15
5922.20
6018.20
66
67
68
69
70
6113.56
6207.77
6301.13
6393.40
6486.61
71
72
73
74
75
6582.21
6676.53
6771.35
6865.05
6958.08
76
77
78
79
80
7052.54
7147.59
7173.00
7185.00
7210.58
81
82
83
84
85
7242.00
7273.10
7304.49
7336.33
7367.07
86
87
88
89
90
7398.19
7429.37
7460.79
7491.33
7522.92
48.32
48.49
48.36
47.21
47.43
49.51
51.06
54.14
55.11
56.60
60.06
63.26
64.85
65.91
68.13
70.37
73.28
73.97
75.84
79.48
85.05
84.97
84.70
86.29
89.01
88.70
87.19
87.37
87.98
87.92
97.51
102.79
104.32
99.09
95.71
92.20
88.79
83.06
76.89
71.66
67.40
62.27
57.71
55.97
53.24
52.60
51.97
52.13
51.68
50.92
50.00
49.10
48.20
47.29
46.42
45.45
44.67
43.79
43.46
41. 20
[(c)2003 IDEAL ID8_1C_01]
95.06
93.35
96.29
95.05
96.00
95.36
94.21
93.36
92.27
93.21
95.60
94.32
94.82
93.70
93.03
94.46
95.05
25.41
12.00
25.58
31.42
31.10
31.39
31.84
30.74
31.12
31.18
31. 42
30.54
31. 59
TVD
depth
(ft)
--------
--------
4288.94
4350.93
4414.83
4478.72
4543.81
4607.04
4667.25
4723.98
4777.43
4829.77
4879.97
4924.76
4966.26
5005.30
5041.62
5075.09
5104.73
5111.90
5115.02
5120.49
5124.72
5127.42
5130.25
5132.75
5134.01
5134.63
5135.75
5137.24
5138.48
5139.61
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ---------------- ---------------
-------- ---------------- ---------------
66.88
56.46
41. 49
29.07
21.89
18.95
20.32
27.67
42.79
65.73
96.28
13 3.64
178.28
226.80
278.29
333.45
390.61
406.13
413 . 52
429.67
450.13
470.86
492.15
514.12
535.72
557.96
580.57
603.64
626.30
650.20
-24.51
-36.81
-53.69
-67.99
-77.07
-81.96
-82.56
-77.22
-64.11
-43.19
-14.69
20.64
63.28
109.88
159.49
212.75
267.99
282.98
290.13
305.75
325.57
345.67
366.32
387.66
408.66
430.30
452.31
474.80
496.89
520.23
3356.68
3425.36
3495.38
3564.26
3634.23
3705.42
3777.87
3851.78
3925.80
4000.00
4076.17
4151.24
4225.03
4296.33
4366.13
4436.59
4508.02
4527.25
4536.36
4555.86
4579.86
4603.44
4626.90
4650.40
4672.80
4695.16
4717.22
4739.11
4760.16
4781.42
3356.77
3425.56
3495.79
3564.91
3635.05
3706.33
3778.77
3852.55
3926.33
4000.24
4076.20
4151. 29
4225.51
4297.74
4369.04
4441.69
4515.98
4536.08
4545.63
4566.11
4591.42
4616.40
4641.38
4666.53
4690.64
4714.84
4738.85
4762.83
4786.02
4809.64
90.42
90.62
90.88
91. 09
91.21
91.27
91.25
91.15
90.94
90.62
90.21
89.72
89.14
88.54
87.91
87.25
86.60
86.42
86.34
86.16
85.93
85.71
85.47
85.23
85.00
84.76
84.52
84.28
84.04
83.79
DLS
(deg/
100f)
3.27
4.23
1. 20
4.25
2.60
3.51
3.23
5.89
5.55
4.91
5.24
5.87
4.64
2.03
3.60
2.45
3.13
2.78
16.00
14.52
17.96
2.89
2.98
5.75
9.29
3.27
5.45
2.86
2.27
7.15
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
Top of Window
Bottom of Window
MWD Incl. Only
MWD Incl. Only
MWD Incl. Only
MWD Incl. Only
MWD Incl. Only
MWD Incl. Only
.
MWD Incl. Only
MWD IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
SCHLUMBERGER Survey Report
17-Dec-2003 21:22:57
Page
5 of 8
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(de g)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
91
92
93
94
95
7554.45
7585.32
7616.11
7647.03
7678.89
96
97
98
99
100
7708.77
7739.93
7771.17
7802.67
7833.60
101
102
103
104
105
7864.14
7895.81
7927.18
7957.67
7989.08
106
107
108
109
110
8020.04
8051. 30
8081.97
8112.68
8144.29
111
112
113
114
115
8174.58
8204.91
8236.71
8267.37
8298.60
116
117
118
119
120
8329.36
8359.15
8390.37
8423.11
8453.41
88.22
88.33
88.74
89.15
89.63
87.81
87.30
89.32
89.53
87.20
87.51
89.25
91.07
90.32
87.37
84.96
82.89
82.92
87.57
92.55
94.95
94.91
92.99
89.25
87.23
87.88
87.50
89.56
92.51
91.89
39.10
39.00
39.36
39.79
40.06
38.68
38.00
41.27
43.02
43.49
44.15
41.37
37.95
34.57
31.57
29.06
25.77
21. 95
21.85
19.28
17.85
17.94
19.83
20.17
15.86
11.01
5.65
1. 75
359.63
357.17
[(c)2003 IDEAL ID8_1C_01]
31. 53
30.87
30.79
30.92
31.86
29.88
31.16
31.24
31. 50
30.93
30.54
31.67
31.37
30.49
31. 41
30.96
31.26
30.67
30.71
31.61
30.29
30.33
31.80
30.66
31.23
30.76
29.79
31.22
32.74
30.30
5140.67
5141.60
5142.39
5142.96
5143.30
5143.96
5145.29
5146.21
5146.53
5147.41
5148.82
5149.72
5149.63
5149.26
5149.89
5151.96
5155.27
5159.06
5161.61
5161.57
5159.59
5156.99
5154.80
5154.20
5155.16
5156.47
5157.67
5158.47
5157.88
5156.72
674.83
699.31
723.69
748.05
773.03
796.63
821.56
846.14
870.06
893.14
915.72
939.54
964.22
989.28
1016.05
1043.13
1071.09
1099.25
1127.93
1157.81
1186.71
1215.71
1245.99
1275.07
1304.99
1335.06
1364.61
1395.79
1428.51
1458.74
544.31
568.27
592.13
615.96
640.39
663.49
687.90
711.95
735.30
757.82
779.83
803.07
827.21
851.79
878.10
904.77
932.35
960.18
988.57
1018.15
1046.80
1075.56
1105.57
1134.37
1164.05
1193.93
1223.37
1254.51
1287.24
1317.50
4801.74
4821.18
4840.62
4860.32
4880.76
4899.71
4919.02
4938.94
4960.07
4981.26
5002.38
5023.87
5043.89
5061.92
5079.05
5094.64
5108.95
5121.26
5132.67
5143.77
5153.39
5162.68
5172.95
5183.43
5193.08
5200.22
5204.53
5206.54
5206.94
5206.09
4832.49
4854.55
4876.70
4899.19
4922.60
4944.43
4966.89
4989.99
5014.28
5038.57
5062.80
5087.65
5111.27
5133.08
5154.40
5174.35
5193.33
5210.49
5227.00
5243.57
5258.64
5273.53
5289.77
5306.10
5321.94
5335.52
5346.38
5355.55
5363.69
5370.21
83.53
83.28
83.03
82.78
82.53
82.29
82.04
81. 80
81.57
81. 35
81.14
80.92
80.69
80.45
80.19
79.93
79.66
79.38
79.10
78.80
78.52
78 .23
77.94
77.66
77.37
77.07
76.77
76.45
76.11
75.80
DLS
(deg/
100f)
6.72
0.48
1. 77
1. 92
1. 73
7.64
2.73
12.30
5.60
7.68
2.39
10.35
12.35
11.35
13 .39
11. 23
12.38
12.36
15.15
17.73
9.22
0.32
8.46
12.25
15.24
15.89
18.02
14.12
11.09
8.37
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
SCHLUMBERGER Survey Report
--------
--------
Seq Measured
# depth
(ft)
------
------
Incl
angle
(deg)
-------
-------
Azimuth
angle
(deg)
------
------
Course
length
(ft)
17-Dec-2003 21:22:57
-------- -------- ----------------
-------- -------- ----------------
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Page
6 of 8
---------------
---------------
Total
displ
(ft)
At
Az im
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
121
122
123
124
125
8484.77
8515.82
8547.13
8579.87
8609.58
126
127
128
129
130
8640.28
8671.95
8704.16
8734.58
8765.50
131
132
133
134
135
8796.77
8827.54
8859.42
8890.44
8922.35
136
137
138
139
140
8953.28
8982.55
9012.89
9044.39
9075.39
141
142
143
144
145
9106.58
9137.66
9168.95
9200.48
9232.12
146
147
148
149
150
9263.31
9294.31
9326.33
9356.78
9388.73
91.31
91. 82
92.34
91.38
90.69
90.90
89.49
89.42
89.49
89.45
89.52
89.69
89.49
89.63
90.00
90.41
88.91
88.39
87.87
88.25
88.05
87.67
87.81
88.80
89.93
90.14
89.18
88.01
86.06
85.72
356.47
355.88
355.79
356.81
356.64
357.30
356.80
357.18
357.25
356.86
355.81
355.63
353.53
350.44
350.57
350.25
349.75
349.53
348.90
347.37
344.99
345.14
345.96
346.57
346.15
346.36
345.19
342.96
342.32
342.36
[(c)2003 IDEAL ID8_1C_Ol]
31.36
31. 05
31.31
32.74
29.71
30.70
31.67
32.21
30.42
30.92
31.27
30.77
31.88
31.02
31.91
30.93
29.27
30.34
31.50
31.00
31.19
31.08
31.29
31.53
31. 64
31.19
31.00
32.02
30.45
31.95
5155.84
5154.99
5153.86
5152.79
5152.26
5151.83
5151.72
5152.03
5152.32
5152.61
5152.89
5153.10
5153.33
5153.57
5153.67
5153.56
5153.73
5154.45
5155.47
5156.52
5157.53
5158.69
5159.93
5160.86
5161.21
5161.19
5161. 37
5162.16
5163.73
5166.02
1489.98
1520.88
1552.02
1584.60
1614.20
1644.80
1676.37
1708.47
1738.81
1769.63
1800.77
1831. 38
1863.02
1893.60
1924.92
1955.26
1983.94
2013.62
2044.37
2074.51
2104.56
2134.34
2164.39
2194.79
2225.32
2255.41
2285.24
2315.77
2344.53
2374.62
1348.80
1379.77
1410.97
1443.63
1473.28
1503.94
1535.57
1567.73
1598.11
1628.99
1660.19
1690.88
1722.61
1753.33
1784.80
1815.30
1844.12
1873.96
1904.88
1935.20
1965.47
1995.48
2025.76
2056.37
2087.12
2117.41
2147.46
2178.24
2207.26
2237.63
5204.35
5202.28
5200.01
5197.90
5196.20
5194.58
5192.95
5191.26
5189.78
5188.19
5186.19
5183.90
5180.88
5176.56
5171.30
5166.14
5161.06
5155.61
5149.71
5143.34
5135.90
5127.89
5120.09
5112.61
5105.15
5097.74
5090.12
5081.34
5072.27
5062.60
5376.29
5382.15
5388.04
5394.65
5401.02
5407.91
5415.23
5422.81
5430.26
5437.92
5445.44
5452.69
5459.76
5465.43
5470.63
5475.79
5480.63
5485.62
5490.73
5495.36
5499.14
5502.48
5506.27
5510.67
5515.31
5520.00
5524.57
5528.54
5531. 72
5535.06
75.47
75.15
74.82
74.48
74.17
73.85
73.53
73.20
72.88
72.57
72.25
71.93
71. 61
71.29
70.96
70.64
70.34
70.02
69.70
69.38
69.06
68.74
68.41
68.09
67.76
67.44
67.13
66.80
66.48
66.15
DLS
(deg/
100f)
2.90
2.51
1. 69
4.28
2.39
2.26
4.72
1. 20
0.33
1. 27
3.37
0.80
6.62
9.97
1. 23
1. 68
5.40
1. 86
2.59
5.08
7.65
1. 31
2.66
3.69
3.81
0.95
4.88
7.86
6.74
1. 07
------
------
Srvy Tool
tool Carr
type (deg)
------
------
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
SCHLUMBERGER Survey Report
17-Dec-2003 21:22:57
Page
7 of 8
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
--------
--------
151
152
153
154
155
9419.81
9451.49
9482.60
9514.16
9545.39
156
157
158
159
160
9576.86
9608.47
9638.11
9669.03
9700.74
161
162
163
164
165
9731. 56
9763.02
9793.45
9821. 84
9853.29
166
167
168
169
170
9884.24
9917.15
9948.15
9980.22
10011.87
171
172
173
174
175
10042.63
10073.21
10105.32
10136.28
10166.92
176
177
178
179
180
10198.16
10229.40
10261.69
10292.42
10323.44
Incl
angle
(deg)
------
------
85.92
86.40
85.92
85.95
87.29
88.01
88.36
88.73
88.32
87.64
89.18
90.14
89.76
88.91
88.87
90.00
90.72
89.90
89.28
89.04
88.98
89.32
90.28
91.27
90.48
88.60
87.84
88.02
88.49
91.34
Azimuth
angle
(deg)
-------
-------
341.68
342.12
340.29
339.86
339.69
342.61
344.01
345.25
344.21
342.73
342.75
341.78
340.89
338.67
336.78
337.39
338.02
337.84
337.58
338.25
339.19
338.91
340.06
340.47
339.55
338.41
337.35
337.58
337.27
336.40
[(c)2003 IDEAL ID8_1C_01]
Course
length
(ft)
------
------
31.08
31.68
31.11
31.56
31.23
31.47
31.61
29.64
30.92
31.71
30.82
31.46
30.43
28.39
31.45
30.95
32.91
31. 00
32.07
31. 65
30.76
30.58
32.11
30.96
30.64
31. 24
31.24
32.29
30.73
31. 02
TVD
depth
(ft)
--------
--------
5168.29
5170.41
5172.49
5174.73
5176.57
5177.86
5178.86
5179.62
5180.41
5181.53
5182.39
5182.57
5182.60
5182.93
5183.54
5183.84
5183.64
5183.47
5183.70
5184.16
5184.69
5185.15
5185.26
5184.84
5184.37
5184.62
5185.59
5186.76
5187.70
5187.74
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
-------- ----------------
-------- ----------------
2403.83
2433.60
2462.70
2491.99
2520.94
2550.41
2580.41
2608.76
2638.34
2668.47
2697.63
2727.32
2755.87
2782.23
2810.99
2839.16
2869.26
2897.66
2926.99
2955.98
2984.32
3012.57
3042.32
3071.17
3099.66
3128.50
3157.10
3186.56
3214.59
3242.76
2267.11
2297.16
2326.54
2356.14
2385.39
2415.14
2445.41
2473.98
2503.79
2534.17
2563.59
2593.56
2622.39
2649.02
2678.12
2706.63
2737.07
2765.80
2795.47
2824.80
2853.46
2882.01
2912.08
2941.22
2970.01
2999.17
3028.10
3057.90
3086.26
3114.78
5053.03
5043.21
5033.21
5022.48
5011.70
5001.55
4992.47
4984.62
4976.48
4967.46
4958.32
4948.74
4939.00
4929.19
4917.27
4905.22
4892.74
4881.09
4868.92
4857.03
4845.86
4834.93
4823.68
4813.23
4802.75
4791. 55
4779.79
4767.42
4755.63
4743.43
Total
displ
(ft)
At
Azim
(deg)
---------------
---------------
5538.31
5541.74
5544.91
5547.67
5550.43
5554.13
5559.21
5564.80
5570.85
5576.53
5581.84
5587.18
5592.01
5595.91
5599.27
5602.41
5606.29
5610.23
5614.37
5618.74
5623.58
5628.73
5634.55
5640.74
5646.89
5652.78
5658.25
5663.84
5669.31
5674.68
65.84
65.51
65.19
64.87
64.55
64.23
63.90
63.60
63.29
62.97
62.66
62.34
62.03
61.75
61.43
61.11
60.78
60.46
60.14
59.82
59.51
59.20
58.88
58.57
58.27
57.96
57.64
57.32
57.02
56.71
DLS
(deg/
100f)
2.28
2.05
6.07
1. 36
4.33
9.55
4.56
4.36
3.61
5.13
5.00
4.34
3.18
8.37
6.01
4.15
2.91
2.71
2.10
2.25
3.06
1. 44
4.67
3.46
3.96
7.04
4.17
0.90
1. 83
9.61
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
.
MWD_IFR_MSA
MWD~IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
<
SCHLUMBERGER Survey Report
17-Dec-2003 21:22:57
Page
8 of 8
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(de g)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
181
182
183
184
185
10385.00
10416.69
10447.72
10478.88
10510.08
186
187
188
10572.93
10603.90
10628.24
189 10680.00
93.43
93.54
93.57
93.37
93.50
93.54
91.79
90.72
336.67
335.64
335.39
336.10
335.74
335.84
336.74
336.35
90.72 336.35
[(c)2003 IDEAL ID8_1C_01]
61. 56
31.69
31. 03
31.16
31.20
62.85
30.97
24.34
51.76
5185.18
5183.25
5181.33
5179.44
5177.57
5173.72
5172.28
5171.74
5171.09
3298.49
3327.06
3354.89
3382.89
3410.96
3467.46
3495.43
3517.48
3171.20
3200.13
3228.31
3256.67
3285.10
3342.32
3370.64
3392.97
4718.94
4706.15
4693.32
4680.54
4667.83
4642.11
4629.67
4619.98
5685.50
5691.11
5696.42
5702.05
5707.94
5720.16
5726.70
5732.06
3564.31 3440.38 4599.22 5743.61
56.10
55.78
55.48
55.17
54.86
54.25
53.94
53.71
53.20
DLS
(deg/
100f)
3.42
3.26
0.81
2.36
1. 22
0.17
6.35
4.68
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD IFR_MSA
MWD_IFR_MSA
MWD_IFR_MSA
MWD IFR_MSA
.
0.00 Projected to TD
.
SCHLUMBERGER
Survey report
Client...... .............: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . . .: Polaris
Well....... ..............: W-205 L1 PB1
API number............ ...: 50-029-23165-70
Engineer.... .............: E. Roux
RIG: . . . . . . . . . . . . . . . . . . . . .: NABORS 9ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions... ..: Minimum curvature
Method for DLS.. ....... ..: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: MEAN SEA LEVEL
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 52.4 ft
KB above permanent.......: N/A Top Drive
DF above permanent... ....: 80.90 ft
----- Vertical section origin----------------
Latitude (+N/S-).. .......: 0.00 ft
Departure (+E/W-).. ......: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-) .........: N 70 17 45.811
Departure (+E/W-) ........: W 149 05 33.633
Azimuth from rotary table to target:
1.56 degrees
~~~\\\~
cÐ03-dO\
16-Dec-2003 06:50:38
Page
1 of 6
Spud date. . . . . . . . . . . . . . . . :
Last survey date.........:
Total accepted surveys...:
MD of first survey.... ...:
MD of last survey.. ......:
13-Dec-2003
16-Dec-03
146
0.00 ft
9284.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model......... ..: BGGM version 2003
Magnetic date.......... ..: 11-Dec-2003
Magnetic field strength..: 1151.20 HCNT
Magnetic dec (+E/W-) .....: 25.24 degrees
Magnetic dip.. ... ........: 80.81 degrees
----- MWD survey Reference Criteria ---------
Reference G............ ..: 1002.68 mGal
Reference H.......... ....: 1151.20 HCNT
Reference Dip..... .......: 80.81 degrees
Tolerance of G... ........: (+/-) 2.50 mGal
Tolerance of H...........: (+/-) 6.00 HCNT
Tolerance of Dip.........: (+/-) 0.45 degrees
.
----- Corrections ---------------------------
Magnetic dec (+E/W-).. ...: 25.24 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-) ....: 25.24 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction RECEIVED
:t"..,."..,
¡ ("/ I' f\OV(U
.~ ...... tJ (~' Lf
,Al~~k~ Oil a Gas Cons, Commision
r;,.,.¡1iI~c
,r}1 hll&"",....,v
SCHLUMBERGER Survey Report 16-Dec-2003 06:50:38 Page 2 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Surface Tie-in
2 138.20 0.07 88.07 138.20 138.20 0.01 0.00 0.08 0.08 88.07 0.05 MWD IFR MSA
3 239.52 0.61 54.75 101.32 239.52 0.33 0.32 0.59 0.67 61.68 0.55 MWD IFR MSA
-
4 300.39 2.25 63.08 60.87 300.37 1.10 1. 04 1. 92 2.18 61. 42 2.71 MWD IFR MSA
-
5 390.94 5.17 82.77 90.55 390.72 2.57 2.36 7.55 7.91 72.62 3.47 MWD IFR MSA
6 483.11 6.93 92.96 92.17 482.38 3.07 2.60 17.22 17.42 81. 42 2.23 MWD IFR MSA .
-
7 576.06 8.31 96.29 92.95 574.50 2.38 1. 57 29.50 29.54 86.95 1.56 MWD IFR MSA
-
8 671.50 10.95 97.11 95.44 668.59 0.93 -0.31 45.35 45.36 90.39 2.77 MWD IFR MSA
-
9 765.37 13.56 93.83 93.87 760.31 -0.37 -2.14 65.19 65.22 91. 88 2.88 MWD IFR MSA
-
10 859.95 15.67 90.40 94.58 851.83 -0.55 -2.97 89.02 89.07 91.91 2.41 MWD IFR MSA
11 954.66 18.74 90.44 94.71 942.29 0.01 -3.18 117.03 117.08 91. 56 3.24 MWD IFR MSA
-
12 1050.16 23.91 88.55 95.50 1031. 22 1. 32 -2.81 151.75 151. 77 91.06 5.46 MWD IFR MSA
-
13 1144.14 27.46 91.14 93.98 1115.91 2.48 -2.76 192.46 192.48 90.82 3.96 MWD IFR MSA
14 1238.39 29.92 90.46 94.25 1198.58 3.09 -3.38 237.70 237.73 90.81 2.63 MWD IFR MSA
-
15 1333.55 33.56 88.26 95.16 1279.50 5.06 -2.77 287.74 287.76 90.55 4.01 MWD IFR MSA
16 1427.00 38.84 92.23 93.45 1354.89 6.21 -3.13 342.89 342.90 90.52 6.18 MWD IFR MSA
-
17 1521. 98 43.73 92.85 94.98 1426.24 5.12 -5.92 405.47 405.52 90.84 5.17 MWD IFR MSA
-
18 1616.01 45.76 92.04 94.03 1493.02 4.11 -8.73 471.60 471.68 91.06 2.24 MWD IFR MSA
-
19 1709.89 45.49 93.10 93.88 1558.68 2.93 -11.74 538.64 538.76 91. 25 0.86 MWD IFR MSA
20 1803.35 44.15 92.96 93.46 1624.97 1.24 -15.22 604.42 604.61 91. 44 1.44 MWD IFR MSA
21 1898.67 42.83 93.34 95.32 1694.12 -0.58 -18.83 669.92 670.19 91. 61 1.41 MWD IFR MSA .
22 1992.58 42.02 93.80 93.91 1763.44 -2.80 -22.77 733.15 733.51 91.78 0.92 MWD IFR MSA
23 2087.21 41. 64 93.69 94.63 1833.96 -5.21 -26.89 796.13 796.58 91.93 0.41 MWD IFR MSA
-
24 2182.02 42.33 93.42 94.81 1904.43 -7.42 -30.82 859.43 859.98 92.05 0.75 MWD IFR MSA
-
25 2276.41 41. 86 93.01 94.39 1974.47 -9.24 -34.37 922.60 923.24 92.13 0.58 MWD IFR MSA
26 2371.24 43.94 92.92 94.83 2043.93 -10.83 -37.71 987.07 987.79 92.19 2.19 MWD IFR MSA
-
27 2465.72 44.80 90.69 94.48 2111.47 -11.10 -39.78 1053.09 1053.84 92.16 1. 88 MWD IFR MSA
28 2560.07 44.84 89.82 94.35 2178.40 -9.58 -40.08 1119.60 1120.31 92.05 0.65 MWD IFR MSA
-
29 2654.53 44.98 90.34 94.46 2245.30 -7.86 -40.17 1186.28 1186.96 91.94 0.42 MWD IFR MSA
30 2750.20 44.95 90.82 95.67 2312.99 -6.71 -40.86 1253.89 1254.55 91. 87 0.36 MWD IFR MSA
SCHLUMBERGER Survey Report 16-Dec-2003 06:50:38 Page 3 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 2845.05 44.48 90.47 94.85 2380.39 -5.64 -41.61 1320.62 1321.27 91.80 0.56 MWD IFR MSA
-
32 2940.21 44.54 87.54 95.16 2448.26 -2.67 -40.45 1387.30 1387.89 91.67 2.16 MWD IFR MSA
-
33 3034.42 44.39 87.64 94.21 2515.49 1. 90 -37.67 1453.24 1453.73 91. 49 0.18 MWD IFR MSA
-
34 3129.22 44.11 87.91 94.80 2583.40 6.27 -35.11 1519.34 1519.74 91.32 0.36 MWD IFR MSA
-
35 3221.57 44.52 88.27 92.35 2649.48 10.17 -32.96 1583.82 1584.16 91.19 0.52 MWD IFR MSA
36 3315.03 44.46 88.48 93.46 2716.15 13.81 -31.10 1649.29 1649.58 91.08 0.17 MWD IFR MSA .
-
37 3409.53 44.42 88.46 94.50 2783.62 17.38 -29.33 1715.43 1715.68 90.98 0.04 MWD IFR MSA
-
38 3504.53 44.80 88.89 95.00 2851.25 20.74 -27.79 1782 . 13 1782.34 90.89 0.51 MWD IFR MSA
-
39 3598.91 45.06 89.18 94.38 2918.07 23.67 -26.67 1848.77 1848.96 90.83 0.35 MWD IFR MSA
-
40 3694.74 46.75 88.01 95.83 2984.75 27.24 -24.97 1917.57 1917.73 90.75 1. 97 MWD IFR MSA
41 3788.33 46.72 88.07 93.59 3048.90 31. 43 -22.64 1985.68 1985.81 90.65 0.06 MWD IFR MSA
-
42 3882.04 48.58 88.49 93.71 3112.02 35.39 -20.56 2054.90 2055.01 90.57 2.01 MWD IFR MSA
-
43 3935.59 49.24 88.61 53.55 3147.22 37.50 -19.54 2095.25 2095.34 90.53 1.24 MWD IFR MSA
-
44 4029.51 47.87 88.73 93.92 3209.38 41.05 -17.91 2165.63 2165.70 90.47 1.46 MWD IFR MSA
-
45 4125.83 47.53 88.86 96.32 3274.21 44.49 -16.41 2236.86 2236.92 90.42 0.37 MWD IFR MSA
46 4219.70 47.06 88.57 93.87 3337.87 47.91 -14.86 2305.82 2305.87 90.37 0.55 MWD IFR MSA
-
47 4313 .18 47.50 90.07 93.48 3401.29 50.60 -14.05 2374.49 2374.53 90.34 1. 27 MWD IFR MSA
-
48 4408.39 49.25 90.60 95.21 3464.53 52.11 -14.47 2445.65 2445.70 90.34 1.88 MWD IFR MSA
49 4502.06 49.19 90.52 93.67 3525.71 53.35 -15.17 2516.58 2516.62 90.35 0.09 MWD IFR MSA
50 4596.92 48.95 90.38 94.86 3587.86 54.74 -15.73 2588.24 2588.29 90.35 0.28 MWD IFR MSA
51 4692.21 48.79 90.24 95.29 3650.54 56.30 -16.12 2660.02 2660.07 90.35 0.20 MWD IFR MSA .
-
52 4786.94 48.40 89.75 94.73 3713.19 58.24 -16.11 2731.07 2731.12 90.34 0.57 MWD IFR MSA
-
53 4881.27 47.90 89.49 94.33 3776.13 60.62 -15.65 2801.33 2801.38 90.32 0.57 MWD IFR MSA
-
54 4976.33 47.54 89.45 95.06 3840.08 63.19 -15.00 2871.66 2871.70 90.30 0.38 MWD IFR MSA
-
55 5070.70 47.15 89.05 94.37 3904.02 65.98 -14.09 2941.06 2941.09 90.27 0.52 MWD IFR MSA
56 5164.92 46.92 88.98 94.22 3968.24 69.05 -12.90 3010.00 3010.02 90.25 0.25 MWD IFR MSA
-
57 5260.11 47.44 91.19 95.19 4032.94 70.84 -13.01 3079.81 3079.84 90.24 1. 79 MWD IFR MSA
-
58 5353.62 47.09 90.56 93.51 4096.40 71.66 -14.06 3148.48 3148.52 90.26 0.62 MWD IFR MSA
-
59 5448.04 46.84 90.99 94.42 4160.84 72.60 -15.00 3217.49 3217.53 90.27 0.43 MWD IFR MSA
-
60 5542.45 47.35 93.52 94.41 4225.11 71.76 -17.72 3286.58 3286.63 90.31 2.04 MWD IFR MSA
SCHLUMBERGER Survey Report 16-Dec-2003 06:50:38 Page 4 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (de g) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
61 5637.51 48.32 97.51 95.06 4288.94 66.88 -24.51 3356.68 3356.77 90.42 3.27 MWD IFR MSA
-
62 5730.86 48.49 102.79 93.35 4350.93 56.46 -36.81 3425.36 3425.56 90.62 4.23 MWD IFR MSA
-
63 5827.15 48.36 104.32 96 .29 4414.83 41. 49 -53.69 3495.38 3495.79 90.88 1.20 MWD IFR MSA
-
64 5922.20 47.21 99.09 95.05 4478.72 29.07 -67.99 3564.26 3564.91 91. 09 4.25 MWD IFR MSA
-
65 6018.20 47.43 95.71 96.00 4543.81 21.89 -77.07 3634.23 3635.05 91. 21 2.60 MWD IFR MSA
66 6113.56 49.51 92.20 95.36 4607.04 18.95 -81.96 3705.42 3706.33 91. 27 3.51 MWD IFR MSA .
-
67 6207.77 51.06 88.79 94.21 4667.25 20.32 -82.56 3777.87 3778.77 91. 25 3.23 MWD IFR MSA
-
68 6301.13 54.14 83.06 93.36 4723.98 27.67 -77.22 3851.78 3852.55 91.15 5.89 MWD IFR MSA
-
69 6393.40 55.11 76.89 92.27 4777.43 42.79 - 64.11 3925.80 3926.33 90.94 5.55 MWD IFR MSA
-
70 6486.61 56.60 71. 66 93.21 4829.77 65.73 -43.19 4000.00 4000.24 90.62 4.91 MWD IFR MSA
71 6582.21 60.06 67.40 95.60 4879.97 96 .28 -14.69 4076.17 4076.20 90.21 5.24 MWD IFR MSA
72 6676.53 63.26 62.27 94.32 4924.76 133.64 20.64 4151. 24 4151.29 89.72 5.87 MWD IFR MSA
73 6771. 35 64.85 57.71 94.82 4966.26 178.28 63.28 4225.03 4225.51 89.14 4.64 MWD IFR MSA
-
74 6865.05 65.91 55.97 93.70 5005.30 226.80 109.88 4296.33 4297.74 88.54 2.03 MWD IFR MSA
-
75 6958.08 68.13 53.24 93.03 5041.62 278.29 159.49 4366.13 4369.04 87.91 3.60 MWD IFR MSA
76 7052.54 70.37 52.60 94.46 5075.09 333.45 212.75 4436.59 4441.69 87.25 2.45 MWD IFR MSA
-
77 7147.59 73.28 51.97 95.05 5104.73 390.61 267.99 4508.02 4515.98 86.60 3.13 MWD IFR MSA
78 7173.00 73.97 52.13 25.41 5111.90 406.13 282.98 4527.25 4536.08 86.42 2.78 TOW
79 7185.00 75.84 51.68 12.00 5115.02 413 .52 290.13 4536.36 4545.63 86.34 16.00 BOW
80 7210.58 79.48 50.92 25.58 5120.49 429.67 305.75 4555.86 4566.11 86.16 14.52 MWD Incl. Only
81 7242.00 85.05 50.00 31.42 5124.72 450.13 325.57 4579.86 4591.42 85.93 17.96 MWD Incl. onl.
82 7273.10 84.97 49.10 31.10 5127.42 470.86 345.67 4603.44 4616.40 85.71 2.89 MWD Incl. Onl
83 7304.49 84.70 48.20 31. 39 5130.25 492.15 366.32 4626.90 4641.38 85.47 2.98 MWD Incl. Only
84 7336.33 86.29 47.29 31. 84 5132.75 514.12 387.66 4650.40 4666.53 85.23 5.75 MWD Incl. Only
85 7367.07 89.01 46.42 30.74 5134.01 535.72 408.66 4672.80 4690.64 85.00 9.29 MWD Incl. Only
86 7398.19 88.70 45.45 31.12 5134.63 557.96 430.30 4695.16 4714.84 84.76 3.27 MWD Incl. Only
87 7429.37 87.19 44.67 31.18 5135.75 580.57 452.31 4717.22 4738.85 84.52 5.45 MWD IFR MSA
88 7460.79 87.37 43.79 31.42 5137.24 603.64 474.80 4739.11 4762.83 84.28 2.86 MWD IFR MSA
-
89 7491.33 87.98 43.46 30.54 5138.48 626.30 496.89 4760.16 4786.02 84.04 2.27 MWD IFR MSA
-
90 7522.92 87.92 41. 20 31.59 5139.61 650.20 520.23 4781.42 4809.64 83.79 7.15 MWD IFR MSA
SCHLUMBERGER Survey Report 16-Dec-2003 06:50:38 Page 5 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
91 7554.45 88.22 39.10 31.53 5140.67 674.83 544.31 4801.74 4832.49 83.53 6.72 MWD IFR MSA
-
92 7585.32 88.33 39.00 30.87 5141.60 699.31 568.27 4821.18 4854.55 83.28 0.48 MWD IFR MSA
-
93 7616.11 88.74 39.36 30.79 5142.39 723.69 592.13 4840.62 4876.70 83.03 1. 77 MWD IFR MSA
-
94 7647.03 89.15 39.79 30.92 5142.96 748.05 615.96 4860.32 4899.19 82.78 1. 92 MWD IFR MSA
-
95 7678.89 89.63 40.06 31. 86 5143.30 773.03 640.39 4880.76 4922.60 82.53 1. 73 MWD IFR MSA
96 7708.77 87.81 38.68 29.88 5143.96 796.63 663.49 4899.71 4944.43 82.29 7.64 MWD IFR MSA .
-
97 7739.93 87.30 38.00 31.16 5145.29 821. 56 687.90 4919.02 4966.89 82.04 2.73 MWD IFR MSA
-
98 7771. 17 89.32 41. 27 31. 24 5146.21 846.14 711. 95 4938.94 4989.99 81. 80 12.30 MWD IFR MSA
-
99 7802.67 89.53 43.02 31.50 5146.53 870.06 735.30 4960.07 5014.28 81.57 5.60 MWD IFR MSA
-
100 7833.60 87.20 43.49 30.93 5147.41 893.14 757.82 4981.26 5038.57 81. 35 7.68 MWD IFR MSA
101 7864.14 87.51 44.15 30.54 5148.82 915.72 779.83 5002.38 5062.80 81.14 2.39 MWD IFR MSA
-
102 7895.81 89.25 41.37 31.67 5149.72 939.54 803.07 5023.87 5087.65 80.92 10.35 MWD IFR MSA
-
103 7927.18 91.07 37.95 31.37 5149.63 964.22 827.21 5043.89 5111.27 80.69 12.35 MWD IFR MSA
-
104 7957.67 90.32 34.57 30.49 5149.26 989.28 851. 79 5061.92 5133.08 80.45 11. 35 MWD IFR MSA
-
105 7989.08 87.37 31.57 31. 41 5149.89 1016.05 878.10 5079.05 5154.40 80.19 13.39 MWD IFR MSA
106 8020.04 84.96 29.06 30.96 5151.96 1043.13 904.77 5094.64 5174.35 79.93 11. 23 MWD IFR MSA
-
107 8051.30 82.89 25.77 31. 26 5155.27 1071.09 932.35 5108.95 5193.33 79.66 12.38 MWD IFR MSA
-
108 8081.97 82.92 21.95 30.67 5159.06 1099.25 960.18 5121.26 5210.49 79.38 12.36 MWD IFR MSA
-
109 8112.68 87.57 21. 85 30.71 5161.61 1127.93 988.57 5132.67 5227.00 79.10 15.15 MWD IFR MSA
-
110 8144.29 92.55 19.28 31. 61 5161.57 1157.81 1018.15 5143.77 5243.57 78.80 17.73 MWD IFR MSA
111 8174.58 94.95 17.85 30.29 5159.59 1186.71 1046.80 5153.39 5258.64 78.52 9.22 MWD IFR MSA .
-
112 8206.59 95.30 18.52 32.01 5156.73 1217.26 1077.09 5163.34 5274.49 78 .22 2.35 MWD IFR MSA
-
113 8237.07 94.81 17.43 30.48 5154.05 1246.38 1105.97 5172.71 5289.62 77.93 3.91 MWD IFR MSA
-
114 8268.80 92.65 14.51 31.73 5151.98 1277.04 1136.41 5181.42 5304.58 77.63 11.43 MWD IFR MSA
-
115 8299.98 90.73 13 .87 31.18 5151.06 1307.46 1166.62 5189.06 5318.59 77.33 6.49 MWD IFR MSA
116 8330.99 89.29 11.11 31.01 5151.06 1337.90 1196.89 5195.77 5331. 84 77.03 10.04 MWD IFR MSA
-
117 8362.75 89.56 9.75 31.76 5151.38 1369.28 1228.13 5201. 52 5344.54 76.72 4.37 MWD IFR MSA
-
118 8393.91 89.53 8.65 31.16 5151.62 1400.16 1258.89 5206.50 5356.53 76.41 3.53 MWD IFR MSA
-
119 8424.61 90.11 7.82 30.70 5151. 72 1430.65 1289.27 5210.89 5368.02 76.10 3.30 MWD IFR MSA
-
120 8455.34 91.11 7.02 30.73 5151.39 1461. 22 1319.74 5214.86 5379.27 75.80 4.17 MWD IFR MSA
SCHLUMBERGER Survey Report 16-Dec-2003 06:50:38 Page 6 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (de g)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
121 8486.53 91.11 4.31 31.19 5150.79 1492.32 1350.77 5217.94 5389.94 75.49 8.69 MWD IFR MSA
-
122 8517.51 91. 31 0.54 30.98 5150.14 1523.28 1381.71 5219.25 5399.04 75.17 12.18 MWD IFR MSA
-
123 8547.81 91.14 357.91 30.30 5149.49 1553.55 1411.99 5218.84 5406.48 74.86 8.70 MWD IFR MSA
-
124 8579.70 92.44 355.48 31.89 5148.49 1585.30 1443.81 5217.00 5413.11 74.53 8.64 MWD IFR MSA
-
125 8610.28 92.86 354.68 30.58 5147.08 1615.66 1474.25 5214.38 5418.78 74.21 2.95 MWD IFR MSA
126 8641. 67 92.65 353.53 31.39 5145.57 1646.74 1505.43 5211.16 5424.26 73.89 3.72 MWD IFR MSA .
-
127 8673.29 92.89 351.46 31.62 5144.04 1677.93 1536.75 5207.04 5429.07 73.56 6.58 MWD IFR MSA
-
128 8703.98 92.20 350.64 30.69 5142.68 1708.08 1567.03 5202.27 5433.16 73.24 3.49 MWD IFR MSA
-
129 8735.16 91. 45 348.10 31.18 5141.68 1738.53 1597.66 5196.52 5436.57 72.91 8.49 MWD IFR MSA
-
130 8765.78 90.28 347.09 30.62 5141.22 1768.25 1627.56 5189.94 5439.16 72.59 5.05 MWD IFR MSA
131 8796.49 90.49 348.37 30.71 5141.02 1798.06 1657.57 5183.42 5442.00 72.27 4.22 MWD IFR MSA
-
132 8827.80 88.95 347.05 31.31 5141. 17 1828.46 1688.16 5176.75 5445.06 71.94 6.48 MWD IFR MSA
-
133 8859.60 89.97 344.16 31.80 5141.47 1859.03 1718.95 5168.85 5447.18 71.60 9.64 MWD IFR MSA
134 8890.19 92.24 341. 55 30.59 5140.88 1888.00 1748.17 5159.83 5447.94 71. 28 11. 31 MWD IFR MSA
135 8921. 45 91.69 340.30 31. 26 5139.81 1917.23 1777.70 5149.62 5447.83 70.95 4.37 MWD IFR MSA
136 8953.00 91.31 342.25 31.55 5138.98 1946.81 1807.57 5139.50 5448.10 70.62 6.29 MWD IFR MSA
-
137 8983.76 87.85 344.21 30.76 5139.21 1976.01 1837.01 5130.63 5449.58 70.30 12.93 MWD IFR MSA
-
138 9014.68 84.96 344.90 30.92 5141.14 2005.51 1866.75 5122.41 5451. 96 69.98 9.61 MWD IFR MSA
-
139 9045.65 84.58 347.66 30.97 5143.97 2035.26 1896.71 5115.09 5455.43 69.65 8.96 MWD IFR MSA
-
140 9076.92 85.07 348.84 31. 27 5146.79 2065.57 1927.20 5108.75 5460.17 69.33 4.07 MWD IFR MSA
141 9108.02 85.27 348.30 31.10 5149.41 2095.76 1957.58 5102.61 5465.23 69.01 1. 85 MWD IFR MSA .
-
142 9138.50 85.72 348.28 30.48 5151.80 2125.34 1987.33 5096.44 5470.21 68.70 1.48 MWD IFR MSA
-
143 9170.04 86.06 348.51 31.54 5154.06 2155.97 2018.15 5090.12 5475.60 68.37 1.30 MWD IFR MSA
-
144 9201.20 84.13 348.78 31.16 5156.73 2186.23 2048.58 5084.00 5481. 22 68.05 6.25 MWD IFR MSA
-
145 9232.53 82.72 348.52 31.33 5160.31 2216.56 2079.10 5077.88 5487.03 67.73 4.58 MWD IFR MSA
146 9284.00 82.72 348.52 51.47 5166.83 2266.30 2129.13 5067.72 5496.81 67.21 0.00 Projected to TD
[(c) 2003 IDEAL ID8 1C 01]
.
ð08-¿9C) l
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Lisa Weepie
Well No W-205 L1 Date Dispatched: 23-Jan-04
Installation/Rig Nabors 9ES Dispatched By: Nate Rose
Data No Of Prints No of Floppies
Surveys
2
RECEIVED
11. 'I f'\ 6 'JQ(\vL
\...:, . ~ i'; L ,~.
AJa3kaOO & Gas Cons. Corr mision
P.li~
Received By:
~~.~
"-
!V"" j'~ ,-Q~.:" è'/~
Please sign and return to:
Drilling & Measurements LWD Division
3940 Arctic Blvd, Suite 300
Anchorage, Alaska 99503
nrose l@slb.com
Fax: 907-561-8417
LWD Log Delivery V 1.1 , 10-02-03
Schlumberger Private
~~~\,~~
.
gì03 -dé) t
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Lisa Weepie
Well No W-205 L1 PBl Date Dispatched: 23-JaIHJ4
Installation/Rig Nabors 9ES Dispatched By: Nate RlIDse
Data No Of Prints No of Floppies
Surveys
2
RECE'V:D
tV,,., ~
! ¡'; ¡,! ? 0; ¿WLt
,"-.. ~,,1 ....... ,
Received By: ~,,~ ~",Q~,",,~~
Aj~aQiI&GasCons.~mm-
Please sign and return to: Jam!s~_
BP Exploration (Alaska) Inc.
Petrotechnical Data Center (LR2-1)
900 E. Benson Blvd.
Anchorage, Alaska 99508
Fax: 907-564-4005
e-mail address:johnsojh@bp.com
LWD Log Delivery V 1.1 , 10-02-03
Schlumberger Private
~~~~"\0~
·
/
¡
í
I
I FRANK H. MURKOWSKI, GOVERNOR
/
¡
/
/
I
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
It
AI,ASIiA OIL AND GAS
CONSERVATION COMMISSION
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519
Re: Prudhoe Bay Unit W-205Ll
BP Exploration (Alaska), Inc.
Permit No: 203-201
Surface Location: 3703' NSL, 1196' WEL, Sec. 21, T11N, RI2E, UM
Bottornhole Location: 1870' NSL, 3427' EWL, Sec. 15, T11N, R12E, UM
Dear Mr. Crane:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations unt il all 0 ther required permits a nd approvals ha ve been is sued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well PBU W-205, Permit No 203-116, API
50-029-23165. Production should continue to be reported as a function of the original API
number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
BY ORDER OF THE COMMISSION
DATED this3f'ct day of December, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
W <1/\ jZ..I":,I2.0o~
1 a. Type of work 0 Drill
ORe-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Suñace:
3703' NSL, 1196'WEL, SEC. 21, T11N, R12E, UM
Top of Productive Horizon:
4170' NSL, 3539' EWL, SEC. 22, T11N, R12E, UM (OBe)
Total Depth:
1870' NSL, 3427' EWL, SEC. 15, T11N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Suñace: x-612049 y-5958680 Zone-ASP4
16. Deviated Wells:
Kickoff Depth
tØ;@asing Pr'ögr'åm
Size
Casinç¡
4-1/2"
. STATE OF ALASKA .
ALASKA AND GAS CONSERVATION CO .ISSION
PERMIT TO DRILL
20 AAC 25.005
1b. Current Well Class 0 Exploratory
o Stratigraphic Test 0 Service
5. Bond: IHI Blanket 0 Single Well
Bond No. 2S100302630-277
6. Proposed Depth:
MD 10674 TVD 5188
7. Property Designation:
ADL 028263
I
II Redrill
. Development Oil 0 Multiple Zone
o Development Gas 0 Single Zone
11. Well Name and Number:
PBU W-205L 1 /'
12. Field I Pool(s):
Prudhoe Bay Field / Polaris Pool
8. Land Use Permit:
13. Approximate SP~.d. :
Decem~003 /
14. Distance to Nearest Property:
20,460'
9. Acres in Property:
2560
Hole
6-3/4"
7202 ft Maximum Hole Angle
Specifications
Grade Couplinç¡
L-80 IBT
91
10. KB Elevation Plan KBE 15. Distance to Nearest Well Within Pool
(Height above GL): = 80.9 feet W-203 is 660' away at top OA
17. Anticipated pressure (see 20 MC 25.035) /
Max. Downhole Pressure: 2228 psig. Max. Suñace Pressure: 1723 psig
Sêtting Depth .' . Quantity of Cêment
Top Bottom (c.f. or sacks)
Lenç¡th MD TVD MD / TVD (includinç¡ staç¡e data)
3497' 7177' 5113' 10674' 5188' Uncemented Slotted Liner ..-'
Weiç¡ht
12.6#
",
PRESENT WI;"L,.CONDl"lQN SUMMARY(TQt:¡e cOmpletêd{or ReCriU AND. Re~entry Ope"ªtions)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD
10670 5224 NIA 10670 5224
Structural
Conductor 108' 20" x 34" 260 sx Arctic Set (Approx.) 108' 108'
Suñace 3956' 10-3/4" 897 sx PF 'L', 352 sx Class 'G' 3985' 3180'
Intermediate 7592' 7-5/8" 561 sx Class 'G' 7618' 5184'
Production
Liner 3152' 4-1/2" Uncemented Slotted Liner 7517' - 10669' 5176' - 5224'
Peñoration Depth MD (ft): 4-1/2" Slotted Section: 7700' - 10667' IPeñoration Depth TVD (ft): 5189' - 5224'
20. Attachments 0 Filing Fee 0 BOP Sketch IHI Drilling Program [J Time vs Depth Plot 0 Shallow Hazard Analysis
o Property Plat 0 Diverter Sketch 0 Seabed Report 181 Drilling Fluid Program IHI 20 MC 25.050 Requirements
21. Verbal Approval: Commission Representative:
22. I hereby certify that t e foregoing is true and correct to the best of my knowledge.
Date:
Contact Michael Triolo, 564-5774
Printed Name Lo II Crane
~f!
Signature. ¡;?..ré~ /¿c{...:-..
,/
Permit To Dr~r I API Number:
Number: .2..03 - 2..ð) 50-029-23165-60-00
Conditions of Approval: Samples Required
Hydrogen Sulfide Measures
Other:Tést toPE to ~SCO f~/.
Title Senior Drilling Engineer
Oríginal Signed By
Sarah Palin
Phone 564-4089
Commission Use Only
I Permit Approvð .\ ¡,W:" See cover.letter for
Date: ¡ : iì C p1Þ~IfSWi"r"JE!U~ ,
DYes § No Mud Log Required t::r1jtt, ~ LJ
D Yes ~ No Directional Survey Required ~ Yes D No
DEC 2 Zoo3
,tt.laska Oil & Gn Cons. Commission
AnchoJ a9 ~
~~~~g~~~~ION Date 1'~b~~lnQ~~cate
Date l' -¡'-r.::3
Prepared By Name/Number:
Terrie Hubble, 564-4628
Approved Bv:
Form 10-401 Revised 3/2003
COMMISSIONER
ORIGINAL
Well Plan Summary
It
Greater Prudhoe Bay W-205 L 1 & L2 Permit
e
IWen/Nap1é:,:;)trW~205'>L..1 and W-205 [2·:
Surface Location: 3,703' FSL, 1,196' FEL, Sec. 21, T11 N, R12E
X = 612,048.97 Y = 5,958,680.13
W-205 L1 OBc Target Start: 4,170' FSL, 1,741' FEL, Sec. 22, T11N, R12E
X = 616,776.04 Y = 5,959,219.64 Z = 5,058' TVDss
W-205 L 1 OBc Target End: 1,869' FSL, 1,852' FEL, Sec. 15, T11 N, R12E
X = 616,613 Y = 5,962,196 Z = 5,107' TVDss
W-205 L2 OBa Target Start: 4,077' FSL, 1,816' FEL, Sec. 22, T11 N, R12E
X = 616,702.44 Y = 5,959,125.52 Z = 4,976' TVDss
W-205 L2 OBa Target End: 1,869' FSL, 1,852' FEL, Sec. 15, T11 N, R12E
X = 616,613 Y = 5,962,196 Z = 5,030' TVDss
I Type of Well (producer or injector):
:¡".
I Schrader OBc and OBa Horizontal Sidetrack Producer
./
./
./
I AFE Number: 1 PLD5M1066 KBE = 80.90' I Rig: I Nabors 9ES ./
I Estimated Start Date: I Dec. 51n 2003 I./' I Operating days to complete: 116.38
I OBc MD I
OBa MD
10,674'
10,659'
Target Estimates:
Estimated Reserves OBa I OBc:
Expected Initial Rate OBa I OBc:
Expected 6 month avg OBa I OBc:
Current Well Information
General
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Original Well API #:
Sidetrack API OBc #:
Sidetrack API OBa #:
Well Type:
Current Status:
H2S:
Cement:
BHP:
BHT:
Is this well frac'd?
II Well TVDrkb: TD 15,18811
Well TVDrkb: TD 5,111
1910 II KOP I
910 KOP
Max Inc.
Max Inc.
7,202
6,955
Expected reserves 1.3 mmbbl
Production rate: 1,865 bId
Production rate: 1,135 bId
-20,460' to the nearest PBU boundary line
Top OA: 660' away from W -203
TD: 580' away from W-201
50-029-23165-00
50-029-23165-60
50-029-23165-61
Schrader OBd Horizontal Producer
See attached Pre-rig completion schematic for details
o ppm from produced fluids (approximated to be around 10 ppm due to
contaminated gas lift gas)
7-%" casing cemented 700' MD over Schrader Ma sands. Pumped -122 bbls of
15.6 ppg Class G cement. Plug bumped as per plan, expected TOC:-5,320' MD
OBa: 2,125 psi @ 4,969' TVDss (8.22 ppg EMW). Actual from MDT's
OBc: 2,228 psi @ 5,050' TVDss (8.48 ppg EMW). Actual from MDT's /'
OBd: 2,248 psi @ 5,099' TVDss (8.48 ppg EMW). Actual from MDT's
101.5 of @ 5,099' TVDss (Estimated)
No
Draft Permit 11/25/03
Mechanical Condition
W-205 Wellhead:
Cellar Box Height:
Nabor 9ES:
Tubing:
Liner:
Casing
Tbg. Hanger:
Tree:
Open Perfs:
Casing Fluids:
Materials Needed
Production Liner:
2 x Production Liners:
As Contingency
As Contingency
As Contingency
As Contingency
As Contingency
As Contingency
e
Greater Prudhoe Bay W-202 L 1 & L2 Permit
FMC Gen 5 System
Above MSL = 52.40'
KB I MSL = 80.90'
4-%", 12.6#, L-80, IBT-M with planned chemical cut packer @ 6,440' MD.
4-%" , 12.6# L-80 liner top @7,517' MD.
Surface: 10-3,4",45.5#, L-80, STc to 3,985' MD (Burst: 5,210; Collapse: 2,470)
Intermediate: 7-%",29.7#, L-80, BTc-M to 7,618' MD (Burst: 6,890 ; Collapse: 4,790)
Liner: 4-%",12.6#, L-80, IBT from 7,517 - 10,669' MD (Burst: N/A ; Collapse: N/A)
FMC 11" x 4-%" with standard BPV profile
Cameron 4-1/16" 5M
4-%" slotted liner in OBd sand (planned to be isolated with IBP at Pr-rig work)
SW with diesel cap down to -2,200' TVD
Amount
7,300'
183 each
2 each
2 each
2 assemblies
Description
4 W', 12.6#, L-80, IBT-Mod Slotted Liner
4 W' x 5 %" x 8" Straight Blade Centralizers
7-%" x 4-%" Baker ZXP Liner Top Packer
4-W' Halliburton Float Shoes
Baker Level 3 Hookwall Hangers with LEM
6,900'
1 each
1 each
2 each
1 each
4 each
1 each
6900'
1 each
4-W' 12.6 Ib/tt, L-80, BTC-M tubing
Baker PRM Production Packer 7-%" X 4-%"
Halliburton XN-Nipple (3.725" ID)
Halliburton X-Nipple (3.813" ID)
4-W' Baker CMD Sliding Sleeve
Camco 4-%" X 1" KBG-2 Gas Lift Mandrels
Phoenix pressure gauge
I-wire for the Phoenix gauge
4-%" WLEG or half-muleshoed joint of 4-%" IBT-M tubing
Surface and Anti-Collision Issues
Surface Shut-in Wells: W-203 and W-12 do not need to be shut-in for the rig move on and off W-205. /~
Close Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile.
r;~~~:I····,:~f·~~··~t~.,w . ·q!!.w·q··I··q··········I···,···qm···,ì!WiiliT·¡¡¡...ÇiICr'\ál':<"'H'" ri"illlill¡ll¡l¡lill¡ll¡ll¡ll¡ll¡ll¡ll¡l¡l¡'.~li;'PI'%"" ¡~~¡1IIi!
¡111.¡lIfJ¡I¡JI.I:¡IIIII¡II51i!i;g¡i~Ii(.....t_r' .' ·.:I,Ii:ØiMð¡T¡ ¡¡llt;.¡~.IIiIIÍiiII!ilI:IIIII~Jlffil¡,: ~\, '.. ,,¡I:II¡,:~II_Œ.~.,:,,:.
None
Mud Program
I LVT-200 MOBM (Versa-Pro)
YP I Oil : H20 Ratio I PV I API Filtrate I
18 - 25 80 : 20 15 - 20 4 - 5.5
6-%" Production Hole Mud Properties:
Interval I Den~ppg) I Stability
Interval (;t 650 - 900
MBT
<6
2
Draft Permit 11/25/03
Well Control
-
Greater Prudhoe Bay W-202 L 1 & L2 Permit
Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will
be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below,
BOP equipment will be tested to 3,500 psi. ..-/
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Section-
· Maximum anticipated BHP: 2,228 psi @ 5,050' TVDss (8.48 ppg EMW). Actual from MDT's ,/
· Maximum surface pressure: 1,723 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
3,500 psi (7-%" casing has been tested to 3,500 psi) /'
Estimated 9.2 ppg Brine / 6.8 ppg Diesel
5,000 psi Working Pressure
(entire stack and valves
3,500/250 psi Rams & Valves
3,500/250 psi Annular
Disposal
· NO ANNULAR INJECTION ON THIS WELL.
· No annular injection in this well.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any
metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all
Class I waste to Pad 3 for disposal.
Formation Markers
OA 4,891 Tops from W-205 original 9·1-
2,157 8.48 Estimated
ORa 4,948 Tops from W-205 original 2,115 8.22 Psi from MDT
ORb 4,978 Tops from W-205 original 2,195 8.48 Estimated
ORe 5,031 Tops from W-205 original 2,218 8.48 Psi from MDT
ORd 5,093 Tops from W-205 original 2,246 8.48 Psi from MDT
Casingrrubing Program
Hole Size Csgl WtlFt Gr,e Conn Length Top Bottom
Tbg O.D. /' MD/TVDrkb MD I TVDrkb
6··3,4" 4- W slotted 12.6# L-80 IBT 3,497 7,177' /5,113' 10,674' / 5,188'
6-3,4" 4-W'slotted 12.6# L-80 IBT 3,729 6,930' / 5,031' 10,659' / 5,111'
Tubing 4-W'solid 12.6# L-80 IBT-M 6,901 29' / 29' 6,930' / 5,031'
4 %" Solid Liner Centralizer Placement
a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking
is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop
collar. Do not put any centralization on the first two joints above the bent joint.
Bit Recommendations
BHA
Number
Prod.
Prod.
Hole Size Depths (MD)
and Section
6-%" 7,177' -10,674'
6-3,4" 6,930' - 10,659'
Bit Type
Nozzles
K-Revs
Hours
Hycalog DSX 146H + GJV
Hycalog DSX146H + GJV
6x10
6x10
3
Draft Permit 11/25/03
Survey and Logging progra'
Greater Prudhoe Bay W-202 L 1 & L2 Permit
e
I 6-%" Hole Sections: I Geosteer through Schrader aBc and aBa sands
While Drilling: MWD I GR I Res I PWD I Azi. Den I Neu I ABI (DenlNeu recorded only)
Motors and Required Doglegs
.... rorA'l.l.'S·'····.· "·"'··.::::~i!__iír" ..'m""···'@~I' ~iiÿ~..:¡¡¡¡···,·""@@'@'"í&, ;~'.rt¥11'.···'.@'*"'1iI!;¡ráf·······,,···F ¡¡¡¡_III....···......· ........
)I.~*· ·.¡~I/r" ...ÎlRmRI~".,. " ·,,;;IIIM. ,..:"OI¡_i¡¡iii~~fjjJJ'.I1:4il~; . ·.j:,~:..'b.:...ÌI reF' ". 'I.'~~I,;..!.....I.. ,. I"~:
1 & 2 4-%" Anadrill A475M4560XP Mud motor, with 1.50 ABH 250 -300 60-80 Maximum build:
with 6.75" stabilizer (AIM) gpm 10.0°/100'
4
Draft Permit 11/25/03
Greater Prudhoe Bay W-202 L 1 & L2 Permit
Drilli! Hazards and Continftncies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Schrader in this fault block is expected to be underpressured based on the MDT samples.
a. OBa: 2,125 psi @ 4,969' TVDss (8.22 ppg EMW). Actual from MDT's
b. OBc: 2,228 psi @ 5,050' TVDss (8.48 ppg EMW). Actual from MDT's
c. OBd: 2,248 psi @ 5,099' TVDss (8.48 ppg EMW). Actual from MDT's
II. Hydrates and Shallow gas
A. Gas hydrates will not be present on this well as the zones which contain hydrates are already cased off in this
well.
III. Lost Circulation/Breathing
A. Lost circulation is unlikely within the Schrader interval.
B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee.
IV. Kick Tolerancellntegrity Testing
A. The 10-%" casing has been cemented to surface.
B. The 7-%" casing has been cemented with 15.6Ib/gal tail cement to 700' MD above the Ma sand -5,320' MD.
C. The Kick Tolerance for the production hole laterals is infinite with 9.2 ppg mud, 11.5 ppg FIT, and an 8.4 ppg pore
pressure. If the FIT is less then 11.5 ppg EMW, then the kick tolerance will be < infinite.
D. Integrity Testing
7-%-in Window
7-% -in Window
20-ft minimum from top window
20-ft minimum from top window
íí::iiiilIY¡¡;¡¡""'ØJi ÞJJiw~ü~rW·"Y¡jllì!l'ilIli"¡ííll ..
IÆI"II.;_~ 11 "" ....ll.Æ\..l;!'f.IAè'i
FIT 11.5 minimum
FIT 11.5 minimum
V. Stuck Pipe
A. We do not expect stuck pipe.
B. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners
moving as much as possible and run one centralizer per joint to help with standoff.
VI. Hydrogen Sulfide /
A. W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be
followed at all times. Water injection on W-Pad was initiated in late 2001, and H2S levels are expected to remain
low until the waterflood matures. Recent H2S data from the pad is as follows:
B. Adjacent producers at Surface:
a. W -12: less than 8 ppm
b. W-203: 0 ppm
C. Adjacent producers at TD:
a. W -200: 0 ppm
D. The maximum recorded level of H2S on the pad was under 20 ppm.
VII. Faults
There are no seismically visible faults to cross while drilling the laterals. It is possible to encounter sub-seismic
faults along the proposed well path. If a fault throws us out of section steer up as fast as possible to determine
where we are within the section. This will make it easy to lowside OH sidetrack to get back on course.
CONSULT THE W PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
5 Draft Permit 11/25/03
Greater Prudhoe Bay W-202 L 1 & L2 Permit
II ."." """.":
Drill ana Complete Procedure Summary
Planned Pre-RiQ Work:
1. cTU Work:
a. Please have PE discuss this job with Donn Schmohr prior to rig-up.
b. Run in hole with nozzle. Hot oil tubing to remove paraffin. Tag for fill in slotted horizontal liner. Do not take
excessive risks to reach TD. Consult with Donn Schmohr if significant fill is found and before attempting any fill
clean-out.
i. On 11/20/03 an attempt to hot oil the tubing resulted in lock-up at 28 Bbls. However, after soaking, the
well was successfully POP'd and tested. Hot oiling is likely required to successfully run logs and
chemically cut the tubing.
ii. It is desirable to ascertain whether sand fill is occurring in liner. This would be useful information for future
multilateral screen designs.
iii. Since this well was drilled with oil based mud to prevent formation damage, we are reluctant to introduce
water onto the formation for a clean-out. Any fill clean-out would probably need to be with diesel or under-
balanced with gas lift or nitrogen.
c. Run memory production logs as follows:
i. Verify that well is in test prior to logging. Save trend data for log analysis.
ii. Make up PDS 1-11/16" memory GR-Spinner-Temperature-Pressure log.
· The objective of the logs are to determine how much length of lateral is productive in a Schrader
Bluff well.
· Note there is an undersized 2.75" XN nipple in the 4-1/2" liner at 7627'. Cautiously approach XN
nipple.
· Consult with PDS to choose proper centralizers (to get into 2.75" XN) and spinner (2-1/8" in-line or
2-1/8" x 4-1/2" folding).
· Don't want to take excessive risks of losing a fish to obtain production logs.
iii. Record 10 min. stop counts in 4-1/2" tubing at 6500' and 4-1/2" liner at 7600',8100',8600',9100',9600',
10100',10500'.
iv. Make three round trip flowing passes of the slotted liner from 7630' to 10500' (one trip each at 30,60, and
90 fpm).
· Log flowing passes up to, but not thru XN nipple at 7627', to prevent damaging logging tool or
losing a fish.
d. Set 2-1/2" Baker Inflatable Bridge Plug in the solid 4-1/2" liner at - 7600' MD.
i. The objective of the IBP is to protect the OBd lateral interval from sidetracking and drilling damage as well
as provide drilling well control. The IBP will have to be retrieved back through multi-lateral junctions with
ID's of 3.560".
ii. The IBP should be set in the solid 4-1/2" liner (7550' - 7627' MD) above the 2.75" XN (7627' MD), but
below the liner tie-back sleeve and cross-overs. Drilling will later set a whipstock in the liner top tie-back
sleeve.
e. Liquid pack the tubing and inner annulus with seawater and freeze protect each to 2500' with diesel.
f. Pressure test IBP to 1000 psi.
g. Shut-in production wing valve and inner annulus valves.
2. Slickline Work:
a. Pull SPMG from GLM #1 at 6508'.
b. Open sliding sleeve at 6416'.
i. If sliding sleeve won't open, then in Step 3c, below, insert a circulating valve instead of a dummy. The
objective is to get a circulation point as deep as possible.
c. Pull LGLV and dummy-off GLM #2 at 6306'.
d. Pull LGLV and dummy-off GLM #4 at 3015'.
3. Electric Line Work:
a. Consult with Baker prior to rig-up to identify from the Driller's Tally the desired cut zone for the Baker Premier
packer.
i. A generic Baker Premier Packer schematic will be sent to the Wireline & Completion Coordinator.
ii. A similar cut on well V-202's packer did not immediately result in the ability to circulate around the packer.
Thus on this well, it is recommended to punch the tailpipe and open the sliding sleeve above the packer.
6 Draft Permit 11/25/03
Greater Prudhoe Bay W-202 L 1 & L2 Permit
b. Consult with SChlumberMrior to rig-up to verify that the right TUbing-~ uncher charge is chosen to perforate
the 4-1/2" tubing, but not the 7-5/8" casing.
c. Run SCMT-GR-CCL-Jewelry Log from maximum allowable depth (_73° at 7150') to 6100' (above packer).
i. The objective of this log is to correlate the jewelry for chemical cutting of the Baker Premier packer and
punching the tubing tail and to identify if any cementing defects exist in the sidetrack intervals.
d. Punch tubing tail from 6449' - 6451', ie 2' -4' feet below the packer.
i. Schlumberger Tubing Puncher Charge, 4 JSPF, 2', 0° phasing, decentralized.
ii. The objective of punching the tubing tail is to allow the gas bubble behind the tailpipe to migrate to the
surface and be bled off safely. We do not want to punch the casing.
e. Chemically cut the Baker Premier packer as per Baker's instructions.
i. There is a 14" cut zone for this packer. Baker has a well tally and spreadsheet for this in their slope shop.
ii. The objective of cutting the packer is to allow the packer to be pulled without milling.
4. Other Work:
a. Bleed gas off the IA and tubing and lubricate in diesel to liquid pack each.
b. PPPOT-IC & PPPOT-T.
c. Set BPV in wellhead.
d. Remove the wellhouse and level the pad in preparation for the rig move.
DrillinCl RiCl Return Operations:
1. MIRU Nabors 9ES. Circulate out diesel freeze protection over to seawater. Verify the well is dead.
2. Set TWC. Nipple down tree. Nipple up and test BOPE. /
3. Pull and lay down the 4-W' tubing and Baker PRM packer.
4. MU clean-out BHA with 4" DP and flat bottom mill (or used bit) / Upper Watermelon String Mill/ boot baskets / GR /
etc. RIH to OBd liner top packer, tag top of liner tie back sleeve, circulate and condition wellbore as required. Pump
hot oil to remove excess paraffin if needed.
5. Clean pits for displacement. Displace over to 9.2 ppg Versapro MOBM. POOH to near OBc window depth, log into ./
top OBc (RA marker) with GR, log across the OBa window as well. POOH, LD cleanout assembly.
6. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is
near the top of the OBc sand (planned KOP: 7,177' MD). Orient whipstock to highside. Shear off Whipstock & mill
window. Perform FIT. POOH
7. RIH with 6-3,4" drilling assembly (with MWD / GR / Res / Azimuthal Den recorded / Neu recorded / AIM) to whipstock. .
Directionally drill to 6-3,4" TD. Planned TD is 10,674' MD. Circulate and condition mud and perform wiper trip. POOH. /
8. Pull whipstock #1.
9. Run and set 4-W' slotted liner and hook hanger, POOH and LD liner running string.
10. Run Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, POOH
11. PU the 7-%" whipstock assembly. Set the whipsock on the OBc liner top packer such that the top of the window is /
near the top of the OBa sand (planned KOP: 6,930' MD). Orient whipstock to highside. Shear off of Whipstock and
mill window. Perform FIT. POOH
12. RIH with 6-3,4" drilling assembly (with MWD / GR / Res / Azimuthal Den recorded / Neu recorded / AIM) to whipstock.
Directionally drill to 6-3,4" TD. Planned TD is 10,659' MD. Circulate and condition mud and perform wiper trip. PO;>H.
13. Pull whipstock #2.
14. Run 4-W slotted liner and hook hanger, POOH and LD liner running string.
15. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer.
16. Clean pits for displacement. Displace over to 9.3 ppg KCL brine. POOH
17. MU 4-W 12.6# BTM-M, L-80 completion assembly and RIH. See completion schematic for details.
18. Land tubing hanger and run in lockdown screws.
19. Reverse in brine with Corexit to protect the annulus.
20. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to
3,500 psi. Shear DCK-1 valve.
21. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi.
22. Pull two-way check. Freeze protect the well to 2,200' TVD. Install VR plug in 7-%" casing annulus valves.
23. Install BPV. Secure the well and rig down / move off Nabors-9ES.
/
/'
/
Post-RiQ Work:
7
Draft Perm it 11/25/03
Greater Prudhoe Bay W-202 L 1 & L2 Permit
1. MIRU slickline. Pull the ball anA / RHC plug. e
2. Pull out DCK-1 shear valve, install GL V in all of the other mandrels as per the PE.
~,_,_,;_""__~,,,:W_,,,'
~_dk ~ ..M:'
Job 1: MIRU:
Critical Issues:
~ Ensure the AOGCC receives 24-hour advance notification of the diverter test and subsequent BOP tests.
~ W-203 and W-12 will not need to be shut in at the surface prior to the W-205 rig move. The well houses may not
need to be removed off of W-203 and W-12 depending on how comfortable the rig team feels moving over W-205.
All surface flowlines and gas lift lines will not need to be depressurized to header pressure. Discuss the move at a
pre-job safety meeting and designate a spotter to ensure there is no danger of a collision.
Nearby Wells W-203 W-12
Distance to Target Well 34.97 34.94
Rig N9ES Wellhead Separation 4.97 4.94
*N9ES requires minimum 15' centers, well houses must be removed & wells shut-in at surface if within 30' of target well*
~ W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be
followed at all times. Water injection on W-Pad was initiated in late 2001, and H2S levels are expected to remain
low until the waterflood matures. Recent H2S data from the pad is as follows:
Adjacent producers at Surface:
W-12: less than 8 ppm
W-203: 0 ppm
Adjacent producers at TD:
W -200: 0 ppm
~ The maximum recorded level of H2S on the pad was under 20 ppm.
Job 2: Decompletion
Critical Issues
~ Premier Packer: The inner sleeve of the Baker Premier packer at 7,517' MD has been cut during the pre-rig work
and should be ready to pull out of the hole with the tubing. The packer will require -30K Ibs overpull at the packer
in order to release the slips and element. Ensure Baker representative is on location prior to pulling tubing
hanger.
~ Tubing Condition: The 4-W' tubing was run back in September 2003 so it should be in very good condition.
Limit over-pull on tubing string to 80% of tensile strength (4-%" = 230,400 Ibs tube and IBT connection is equal to
100% of the tube strength), and if the tubing will not pull free on initial attempt, it may be necessary to RU e-line to
make a second cut on the packer and or the tubing directly above the packer.
~ Wellhead: The wellhead is a FMC Gen 5 USH with 10-3,4" mandrel casing hanger, a 7-%" mandrel casing hanger
and a 4-W' tubing hanger with 4-W' TClllift threads.
~ NORM Testing: NORM test all retrieved well head and completion equipment even though there should be little
scale. Send tree to APC Valve shop for repair and/or refurbishment or have the tree inspected in the cellar area if
convenient. Send the adapter flange and tubing hanger to Tool Services for inspection. Send the tubing to
Tuboscope to inspect the threads and redope. The tree and tubing hanger should be re-used on this well if
possible. The tubing should also be reused on this well if possible.
~ Tubel Pressure Gauge: It is planned to rerun this downhole gauge with the re-completion of this well, therefore it
is extremely important to handle the sub very delicately. When it is pulled out of the ground it will need to be
refurbished with new batteries and checked out by Tubel Technologies Inc. prior to rerunning it.
~ Fluid Level: Monitor the well to ensure the fluid column is static, prior to pulling the completion. The OBd lateral
will be isolated with a pressure tested IBP set in the tubing below the liner top packer at 7,600' MD by coil. Thus,
there should be no problem with losses during the decompletion and or drilling of the subsequent laterals. It is
possible that the reservoir pressure within the OBd sand section has been reduced below the MDT recorded
pressure due to offtake.
8
Draft Permit 11/25/03
,---._~,
Greater Prudhq~ Bay W-202 L 1 & L2 Permit
Job 3: Mill OBc Window
Hazards and Contingencies:
~ Equipment Measurements: Verify measurements of all assemblies prior to picking up
~ Whipstock Orientation I Depth: The whipstock should be oriented to ±15° left of high side. This will allow for a
better window and allow for easier access into the window with the bent joint on the end of the 4-W' liner. Exact
window depth to be based off of actual logs. Depth control will be very critical on this window. This window will
require space out tubulars below the whipstock to allow the whipstock to land out on the ZXP liner top packer used
on the OBd lateral. A discussion will need to take place to determine the best way to gain accurate depth control
for the window setting depth. Planned depth is 7,177' MD (5,113' TV D) with RA tag @ 7,119' MD..
~ Window Milling: It is critical to have a smooth uniform full length window. Extra time spent on the window milling
will be well worth it when it comes time to land out the hook hanger. Follow the BOT representative during the
milling of the window.
~ Whipstock Setting: On past wells, only one shear was observed during the whipstock setting procedure. This
introduced some uncertainty as to whether or not the slide was oriented correctly. The most likely explanation for
this is that on high angle wells cased hole friction may cause the 15-20K bottom trip and the 35K whipstock shear
to occur simultaneously.
~ FIT: An FIT of 11.5 ppg EMW is required at the 7-%" window. This will cover the expected normal ECD range for
this section. The kick tolerance for the 6-3,4" open hole section would be an infinite influx assuming a kick from the
Schrader anywhere along the lateral. This is a worst case scenario based on an 8.8 ppg pore pressure gradient, a
fracture gradient of 11.5 ppg at the 7-%" window, and 9.2 ppg MOBM in the hole.
Job 4: Drill 6-3,4" Lateral (OBc Sand)
Critical Issues
~ MOBM: The production interval will be drilled with a 9.2 ppg VersaPro MOBM. This fluid has been utilized
before on past wells, however it has inherent HSE issues associated with its handling and thus all safety
procedures should be refreshed. Review the BP MaC, the Nabors Hazard Analysis, and the MI drilling fluids
program prior to utilizing this fluid.
~ Geosteering: Geosteering in this lateral interval is expected to be the most challenging aspect of this well.
Anadrill AIM will be used and should help mitigate some of this challenge. A 1.50 bent housing motor will be
used to help proactively make corrections quicker to avoid unnecessary undulations throughout this interval.
There will be a rigsite geologist on location to help with interpretations.
o The OBd sand lateral has already been drilled on this well thus providing some dip and faulting
information for this lateral. The directional plan reflects this knowledge but should only be used as a
guide and real time adjustments will need to be made to stay within the sand. If for whatever reason
we become lost, steer up as hard as possible to determine where within section we are. Once we are
able to determine where we are, then we can go back and OH sidetrack.
~ Surveying: Survey density is critical to achieve vertical positional certainty. It is recommended to survey
every 30-45' to ensure accurate vertical positional certainty throughout the horizontal section. This survey
density should alleviate the errors associated with vertical section creep.
~ ECD/Hole Cleaning: Utilize PWD to monitor for good hole cleaning and ECD trends. Cuttings will tend to
dune up at the window due to hole geometry. Planned ECD hardline 12.0 ppg EMW.
~ Target Constraint: The West side of the polygon is defined as a hard line due to proximity to a fualt. The
North, South and East sides of the polygon are defined by reservoir off-take considerations and are not strict
hard lines.
Job 5: Retrieve Whipstock #1
9
Draft Permit 11/25/03
Critical Issues:
"
Greater Prudho~ Bay W-202 L 1 & L2 Permit
~ Orientation of Retrieval Hook: When scribing to align the MWD to the hook remember that the
orientation of the hook will need to be 1800 from the orientation of the whipstock.
~ Whipstock Retireval: This whipstock must be retrieved in order to land the hook hanger in the window.
Extra time should be taken in order to ensure successful retrieval of the whipstock with the hook due to
potential problems associated with the back-up retrieval methods.
~ Magnet: We will run a Baker string magnet in the assembly to help clean up any metal left behind after
the milling and drilling of this lateral to ensure that we do not get hung up high while running the Hook and
the LEM.
Job 6: Run 4-%" Slotted Liner with Hook Hanqer and LEM(OBc Sand)
Critical Issues
~ Liner to bottom: It is imperative that we get this liner near bottom to allow for proper placement of the
Hook Hanger. Liner near bottom will also prevent the sand from collapsing, keeping the entire drilled
section in tact, thus capturing all of the reserves possible for this section length. If problems are
encountered while RIH with the liner stop and POOH and make a cleanout run with a hole opener.
~ Centralizer Placement (5-3,4" OD):
o See centralizer strategy on page 4. Do not run any on the first two joints.
~ 4-%" Rams: Keep VBR's in. Can also utilize annular if necessary.
~ Have a Baker completion specialists onsite to engineer and supervise this liner job.
4 V2", 12.6#, L-80 IBT
100%
80%
ID (drift)
3.833
Collapse
N/A
N/A
Burst
N/A
N/A
Tensile
288,000 Ibs
230,400 Ibs
~ Connection make-up information:
4-%" IBT - makeup to position
;.----'-1.1.'
Job 7: Mill OBa Window
Hazards and Contingencies:
~ Equipment Measurements: Verify measurements of all assemblies prior to picking up
~ Whipstock Orientation I Depth: The whipstock should be oriented to ±15° left of high side. This will allow for a
better window and allow for easier access into the window with the bent joint on the end of the 4-%" liner. Exact
window depth to be based off of actual logs. Depth control will be very critical on this window. This window will
require space out tubulars below the whipstock to allow the whipstock to land out on the ZXP liner top packer used
on the OBc lateral. A discussion will need to take place to determine the best way to gain accurate depth control
for the window setting depth. Planned depth is 6,930' MD (-5,031' TV D) with RA tag @ 6,876' MD.
~ Window Milling: It is critical to have a smooth uniform full length window. Extra time spent on the window milling
will be well worth it when it comes time to land out the hook hanger. Follow the BOT representative during the
milling of the window.
~ Whipstock Setting: On past wells, only one shear was observed during the whipstock setting procedure. This
introduced some uncertainty as to whether or not the slide was oriented correctly. The most likely explanation for
this is that on high angle wells cased hole friction may cause the 15-20K bottom trip and the 35K whipstock shear
to occur simultaneously.
~ FIT: An FIT of 11.5 ppg EMW is required at the 7-%" window. This will cover the expected normal ECD range for
this section. The kick tolerance for the 6-3,4" open hole section would be an infinite influx assuming a kick from the
Schrader anywhere along the lateral. This is a worst case scenario based on an 8.8 ppg pore pressure gradient, a
fracture gradient of 11.5 ppg at the 7-%" window, and 9.2 ppg MOBM in the hole.
10
Draft Permit 11/25/03
Job 7: Drill 6-%" Lateral (OBa sal
Greater Prudhoe Bay W-202 L 1 & L2 Permit
e
Critical Issues
~ MOBM: The production interval will be drilled with a 9.2 ppg VersaPro MOBM. This fluid has been utilized
before on past wells, however it has inherent HSE issues associated with its handling and thus all safety
procedures should be refreshed. Review the BP MOC, the Nabors Hazard Analysis, and the MI drilling fluids
program prior to utilizing this fluid.
~ Geosteering: Geosteering in this lateral interval is expected to be the most challenging aspect of this well.
Anadrill AIM will be used and should help mitigate some of this challenge. A 1.50 bent housing motor will be
used to help proactively make corrections quicker to avoid unnecessary undulations throughout this interval.
There will be a rigsite geologist on location to help with interpretations.
o The OBd and OBc sand laterals have already been drilled on this well thus providing some dip and
faulting information for this lateral. The directional plan reflects this knowledge but should only be
used as a guide and real time adjustments will need to be made to stay within the sand. If for
whatever reason we become lost, steer up as hard as possible to determine where within section we
are. Once we are able to determine where we are, then we can go back and OH sidetrack.
~ Surveying: Survey density is critical to achieve vertical positional certainty. It is recommended to survey
every 30-45' to ensure accurate vertical positional certainty throughout the horizontal section. This survey
density should alleviate the errors associated with vertical section creep.
~ ECD/Hole Cleaning: Utilize PWD to monitor for good hole cleaning and EcD trends. Cuttings will tend to
dune up at the window due to hole geometry. Planned ECD hardline 12.0 ppg EMW.
~ Target Constraint: The North end of the polygon is defined as a hard line due to proximity to a large fault.
The West, South and East sides of the polygon are defined by reservoir off-take considerations and are not
strict hard lines.
"~"<'·_M
Job 8: Retrieve Whipstock #2
Critical Issues:
~ Orientation of Retrieval Hook: When scribing to align the MWD to the hook remember that the
orientation of the hook will need to be 1800 from the orientation of the whipstock.
~ Whipstock Retireval: This whipstock must be retrieved in order to land the hook hanger in the window.
Extra time should be taken in order to ensure successful retrieval of the whipstock with the hook due to
potential problems associated with the back-up retrieval methods.
~ Magnet: We will run a Baker string magnet in the assembly to help clean up any metal left behind after
the milling and drilling of this lateral to ensure that we do not get hung up high while running the Hook and
the LEM.
Job 9: Run 4-%" Slotted Liner with Hook Hanqer and LEM(OBa Sand)
Critical Issues
~ Liner to bottom: It is imperative that we get this liner near bottom to allow for proper placement of the
Hook Hanger. Liner near bottom will also prevent the sand from collapsing, keeping the entire drilled
section in tact, thus capturing all of the reserves possible for this section length. If problems are
encountered while RIH with the liner stop and POOH and make a cleanout run with a hole opener.
~ Centralizer Placement (5-%" OD):
o See centralizer strategy on page 4. Do not run any on the first two joints.
~ 4-%" Rams: Keep VBR's in. Can also utilize annular if necessary.
~ Have a Baker completion specialists onsite to engineer and supervise this liner job.
4 W', 12.6#, L-80 IBT-M
100%
ID (drift)
3.833
Collapse
N/A
Burst
N/A
I Tensile
288,000 Ibs
Draft Permit 11/25/03
11
Greater Prudhq,.e Bay W-202 L 1 & L2 Permit
80%-
N/A
ì'lllÄ 230,400 Ibs
~ Connection make-up information:
4-%" IBT - makeup to position
Job 12: Run 4-%" Completion:
Critical Issues
~ Thread Dope: BOL 2000 NM or BOL 2000 is the BP approved thread compound for Carbon API connections. All
IBT -M pipe should arrive on location with one of these two thread compounds. It would still be good practice to
look over each connection in the pipe shed prior to incorporating them into the tally.
~ Shear Valve: We will run a DcK shear valve in the GLMdirectly above the production packer to utilize for freeze
protecting after the production packer is set.
~ Phoenix Pressure Gauge: A downhole pressure gauge with control lines will be run on this well. Ensure that a
Baker Centrilift hand and a Schlumberger completions hand (Cameo) is on location prior to PU tubing to allow
them time to get all of their equipment in order and confirm its working condition.
o HSE: Sheaves hung in the derrick and I-wire spools will be utilized during the running of the completion,
make sure that this non-routine operation is discussed in length at the PJSM with all relevant personnel
prior to PU completion.
o Place 1 cannon clamp per joint for the first 10 joints followed by 1 clamp per every 2 joints to surface.
o Test the I-wire connection at regular intervals while running in the hole. If the I-wire is damaged in any
way contact ODE.
~ Tubel Pressure Gauge: It is planned to rerun this downhole gauge with this completion. When it is pulled out of
the ground it will need to be refurbished with new batteries and checked out by Tubel Technologies Inc. prior to
rerunning it. No I-wire is needed with this gauge, however it will be necessary to install a receiver for the downhole
gauge to the tubing just below the tubing hanger and run a control line from the receiver through a control line port
in the tubing hanger.
~ Contact the Field AOGCC Rep with 24 hours of notice to witness the tubing and annulus pressure tests.
Job 13: ND/NUlRelease Riq:
Critical Issues
~ See Job 1 for adjacent well spacing. Identify hazards in a pre move meeting, and take every precaution
to ensure good communication prior to beginning the rig move. Use spotters when moving the rig.
~ Diesel: Diesel will be used to freeze protect the well. The diesel flash point is 1000 F. Diesel vapor
pressure is - 0.1 psia at 1000 F.
12
Draft Permit 11/25/03
PRE-RIG -DECOMPLETIOe
W-205 OBd Only
TREE: FMC 4-1/16" 5M
WELLHEAD: FMC Gen 5 System
11", 5M csg.head wI?" mandrel hanger & packoff
11" x 11", 5M, tbg spool wI
11" x 4-1/2" tubing hanger with control line ports
11" X 4-1/16" Adaptor Flange
e
Orig KB elev (N-9ES) = 28.5'
~
... 20" X 34" 215.5Ib/ft, A53 ERW Insulatod
109'
_._ /'" Halliburton X-Nipple (3.813" ID) 12,620' MD I
. .--
~
.... 10-3/4",45.5# L-80 BTC Csg @ 3,985' MD
All Mandrels dummied off.
2,500' TVD, 2 & 4 joints above the
sliding sleeve, & just above WLEG
RA Tag
@6.~
7-5/8",29.7#, L-80, BTC-M
Casing Drift: 6.75"
Casing 10: 6.875"
4.5" Baker CMD sliding sleeve with 3.813" ID
.,..",., Opened for circulation
,,7-5/8" X 4-1/2" Baker PRM Packer
Holes punched in the tubing below the
packer for trapped gas -
4-1/2", 12.6Ib/ft, L-80, BTC-M
Coupling 00: 5.2"
OriftllO: 3.833"/3.958"
/alliburton X-Nipple (3.813" ID)
..",,,.<"""
./., Halliburton XN-Nipple (3.725" ID)
----
4.5" WLEG I -6,589' I
---
Tubel Downhole Pressure gauge
Baker ZXP Liner Top/Tie back Sleeve @ 7,517'./D
Baker 2.5" Inflatable Bridge Plug @ 7,600' MD
7-5/8" Casing Shoe @ 7,618' MD
Halliburton XN-Nipple (2.75" ID)
-7,627'
- ..........~..~.....,.
............. . . . ',xx :~
~ ~ ::. ,.~,'- ,"" '"",
¥F. .. ",,,q{ ~"..........J
............
6-3/4" OBd Lateral 7,618 - 10,669' I
DATE
REV. BY
COMMENTS
G
7/1/2003
12/1/2003
MIK TRIOLO
MIK TRIOLO
OBd Lateral Completion
OBd Pre-Rig Decompletion Schematic
Polaris
WELL: W-205
API NO: 50-029-23165-00
POST RIG - COMPLETION
W..205, W..205 L1 & W..205 L2
""
TREE: FMC 4-1/16" SM I
WELLHEAD; FMC Gen S System Orig KB elev (N-9ES) :::: 28.5'
11",SM csg.head wIT' mandrel hanger 8. packott
11" x 11",SM, tbg spool wI
x 4-1/2" tubing hanger with control line ports
4-1/16" Adaptor Flange
20" X 34" 215.5Ib/ft, AS3 ERW Insulated l 109'
...
(3.813" 10) 12,620'
..."
.... 10-3/4",45.5# l..sO BTC Csg@3,98S'I\IID
7...fj/8" X 5-1/2" Baker PRM Packer
Halliburton X-Nipple (3.813" ID)
4.5" WLEG 1-6.900' I
Baker ZXP Liner Top Packer & Hanger @ 6,900' MO
9.2 Versapro MOBM below Completion
6-3/4" OBa Lateral 16,930'-10,659'1
Baker Hught'as Hookwall Hanger @ 6,920' MO
Window In 7-5/8" casing@ 6,930' MD
Well Inclination @ Window:::: 67°
Baker ZXP Liner Top Packer & Hanger @ 7,147' MD
6-3/4" OBc Lateral 11.111'-10.674'1
Baker Hughes Hookwall Hanger @ MD
Window in 7-5/8" casing@ 7,177' MD
Well Inclination @ Window:::: 74°
Baker ZXP Liner Top Packer & Hanger @ 7,51 T MD
Faker 2.5" Inflatable Bridge Plug @ 7,600' M
7-518",29.7#, L-80, BTC-M
Casing Drift: 6.75" 7-5/8" Casing Shoe @ 7,618' MD
Casing ID: 6.875"
...
6-3/4" OBd lateral 11,618'-10,6691
DATE
REV. BY
COMMENTS
1211/2003
MIK TRIOLO
Level 3 Multi-Lateral, 4-112" GL Completion
POLARIS
WELL: W-205 ML
API NO: 50-029-23165-00
50-029-23165-60
50-029-23165-61
W-205L 1 (P4) Proposal Schlumberger
Report Date: November 24,2003 Survey 1 DLS Computation Method: Minimum Curvature 1 Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 1.560·
Field: Prudhoe Bay Unit - WOA d Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure 1 Slot: W-PAD 1 W-205 pe.slblllty stu Y TVD Reference Datum: Rotary Table
Well: W-205 TVD Reference Elevation: 80.9 ft relative to MSL
Borehole: Plan W-205L 1 OBc Sea Bed 1 Ground Level Elevation: 47.830 ft relative to MSL
UWUAPI#: 500292316560 Magnetic Declination: 25.243·
Survey Name I Date: W-205L 1 (P4) 1 November 21,2003 T ota! Field Strength: 57558.207 n T
Tort I AHD I DDII ERD ratio: 232.623· 18132.88 ft 16.590 11.56E Magnetic Dip: 80.808· e
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Declination Date: December 06, 2003
Location LatlLong: N 70.29605863, W 14909267577 Magnetic Declination Model: B88M 2003
Location Grid N/E Y/X: N 5958680.130 ftUS, E 612048.970 ftUS North Reference: True North
Grid Convergence Angle: -+{).85420613· Total Corr Mag North -) True North: +25.243·
Grid Scale Factor: 0.99991426 Local Coordinates Referenced To: Well Head
l Comments Measured Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I NS EW I DLS I Build Rate I Walk Rate I Tool Face I Northing Easting Latitude Longijude
Depth Section
(It) (deg) (deg) (It) (It) (It) (It) (It) (deg/100 It) (degl100 It) (deg/100 It) (deg) (ltUS) (ltUS)
Top Whipstock 7176.65 74.07 52.16 5112.90 5032.00 408.35 285.13 4530.01 2.80 2.74 0.64 -18.00G 5959032.74 616573.83 N 70.29683386 W 149.05599722
Base Whipstock 7188.65 75.90 51.54 5116.01 5035.11 415.76 292.29 4539.13 16.00 15.22 -5.10 O.OOG 5959040.03 616582.84 N 70.29685341 W 149.05592339
KOP Cry 10/100 7201.65 75.90 51.54 5119.17 5038.27 423.86 300.13 4549.00 0.00 0.00 0.00 -18.98G 5959048.02 616592.59 N 70.29687481 W 149.05584341
7300.00 85.22 48.35 5135.29 5054.39 488.24 362.52 4623.15 10.00 9.47 -3.25 -18.45G 5959111.49 616665.80 N 70.29704512 W 149.05524274
End Cry 7342.83 89.28 46.99 5137.35 5056.45 517.90 391.32 4654.77 10.00 9.49 -3.16 O.OOG 5959140.76 616696.98 N 70.29712375 W 149.05498656
Cry 6/100 7391.16 89.28 46.99 5137.95 5057.05 551.81 424.29 4690.11 0.00 0.00 0.00 -94.30G 5959174.25 616731.82 N 70.29721375 W 149.05470025
7400.00 89.24 46.46 5138.06 5057.16 558.04 430.34 4696.55 6.00 -0.45 -5.98 -94.29G 5959180.40 616738.17 N 70.29723028 W 149.05464813
W-205 OBc T2 7454.56 89.00 43.20 5138.90 5058.00 597.75 469.02 4735.00 6.00 -0.45 -5.98 -94.43G 5959219.64 616776.04 N 70.29733588 W 149.05433657
End Cry 7482.45 88.87 41.53 5139.42 5058.52 618.86 489.63 4753.79 6.00 -0.46 -5.98 O.OOG 5959240.53 616794.52 N 70.29739215 W 149.05418428
Cry 6/100 7739.57 88.87 41.53 5144.48 5063.58 815.87 682.07 4924.24 0.00 0.00 0.00 -96.87G 5959435.4 7 616962.06 N 70.29791758 W 149.05280320
7800.00 88.44 37.93 5145.90 5065.00 863.36 728.52 4962.84 6.00 -0.71 -5.96 -96.78G 5959482.49 616999.97 N 70.29804442 W 149.01133
W-205 OBc T2.5 7834.05 88.20 35.90 5146.90 5066.00 891.12 755.74 4983.29 6.00 -0.71 -5.96 -96.60G 5959510.00 617020.00 N 70.29811872 W 149.0 .66
7900.00 87.75 31.97 5149.23 5068.33 946.77 810.41 5020.07 6.00 -0.68 -5.96 -96.46G 5959565.21 617055.96 N 70.29826801 W 149.05202651
End CRy 7971.85 87.27 27.68 5152.35 5071.45 1009.98 872.67 5055.76 6.00 -0.67 -5.97 O.OOG 5959627.99 617090.72 N 70.29843804 W 149.05173718
Cry 6/100 8076.77 87.27 27.68 5157.35 5076.45 1104.08 965.47 5104.44 0.00 0.00 0.00 -81.99G 5959721.50 617138.00 N 70.29869149 W 149.05134250
8100.00 87.4 7 26.30 5158.41 5077.51 1125.04 986.15 5114.97 6.00 0.84 -5.95 -81.92G 5959742.34 617148.22 N 70.29874797 W 149.05125710
8200.00 88.32 20.35 5162.09 5081.19 1217.80 1077.88 5154.52 6.00 0.86 -5.94 -81.70G 5959834.63 617186.40 N 70.29899848 W 149.05093635
8300.00 89.20 14.42 5164.26 5083.36 1313.95 1173.25 5184.38 6.00 0.87 -5.94 -81.57G 5959930.42 617214.83 N 70.29925896 W 149.05069405
W-205 OBc T3 8391.25 90.00 9.00 5164.90 5084.00 1403.74 1262.56 5202.89 6.00 0.88 -5.94 -81.39G 5960020.00 617232.00 N 70.29950293 W 149.05054366
8400.00 90.08 8.48 5164.89 5083.99 1412.42 1271.21 5204.21 6.00 0.90 -5.93 -81.39G 5960028.66 617233.20 N 70.29952655 W 149.05053285
8500.00 90.97 2.55 5163.97 5083.07 1512.13 1370.70 5213.82 6.00 0.90 -5.93 -81.45G 5960128.28 617241.32 N 70.29979832 W 149.05045451
8600.00 91.86 356.61 5161.50 5080.60 1611.99 1470.62 5213.09 6.00 0.89 -5.94 -81.60G 5960228.17 617239.10 N 70.30007130 W 149.05045987
End Cry 8699.17 92.72 350.72 5157.54 5076.64 1710.10 1569.06 5202.16 6.00 0.87 -5.94 O.OOG 5960326.43 617226.71 N 70.30034026 W 149.05054781
Well Design Ver 3.1 RT-SP3.03-HF2.03 Bld( d031 rt-546 )
W-205IW-205IPlan W-205L 1 OBcIW-205L 1 (P4)
Generated 11/24/20039:01 AM Page 1 of 2
Comments Measured I Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I NS EW I DLS I Build Rate I Walk Rate I Tool Face I Northing Easting LatKude LongKude
Depth Section
(It) (deg) (deg ) (It) (It) (It) (It) (It) (deg/100 It) (deg/100 It) (deg/100 It) (deg) (ltUS) (ltUS)
Cry 6/100 8706.40 92.72 350.72 5157.19 5076.29 1717.20 1576.19 5201.00 0.00 0.00 0.00 -146.19G 5960333.54 617225.44 N 70.30035974 W 149.05055720
W-205 OBc T4 8760.90 90.00 348.90 5155.90 5075.00 1770.53 1629.81 5191.36 6.00 -4.99 -3.34 -146.27G 5960387.00 617215.00 N 70.30050623 W 149.05063496
End Cry 8777.68 89.16 348.34 5156.02 5075.12 1786.88 1646.25 5188.05 6.00 -4.99 -3.33 O.OOG 5960403.39 617211.45 N 70.30055116 W 149.05066167
Cry 6/100 9323.47 89.16 348.34 5164.00 5083.10 2318.15 2180.72 5077.76 0.00 0.00 0.00 -129.37G 5960936.11 617093.22 N 70.30201150 W 149.05155184
W-205 OBc T5 9380.34 87.00 345.70 5165.90 5085.00 2373.16 2236.10 5065.00 6.00 -3.80 -4.64 -128.60G 5960991.29 617079.63 N 70.30216282 W 149.05165492
9400.00 86.26 344.78 5167.05 5086.15 2392.00 2255.08 5060.00 6.00 -3.74 -4.70 -128.54G 5961010.19 617074.35 N 70.30221468 W 149.05169531
End Cry 9417.11 85.63 343.97 5168.27 5087.37 2408.31 2271.52 5055.40 6.00 -3.74 -4.71 O.OOG 5961026.56 617069.51 N 70.30225959 W 149.05173246
Cry 6/100 9579.45 85.63 343.97 5180.65 5099.75 2562.60 2427.09 5010.71 0.00 0.00 0.00 -51.77G 5961181.43 617022.50 N 70.30268468 W 149.05209360
9600.00 86.39 343.00 5182.08 5101.18 2582.09 2446.75 5004.88 6.00 3.72 -4.72 -51.70G 5961201.00 617016.38 N 70.30273839 W 149.05214069
W-205 OBc T6 9670.10 89.00 339.70 5184.90 5104.00 2647.81 2513.10 4982.48 6.00 3.72 -4.71 -52.82G 5961267.00 616993.00 N 70.30291969 W 149.0.72
End Cry 9693.22 89.84 338.59 5185.13 5104.23 2669.18 2534.70 4974.25 6.00 3.63 -4.78 O.OOG 5961288.48 616984.45 N 70.30297873 W 149.0 25
TO / 4-112" Lnr 10673.91 / 89.84 338.59 5187.90 5107.00 3572.14 3447.74 4616.34 0.00 0.00 0.00 O.OOG 5962196.00 616613.00 N 70.30547370 W 149.0 250
Leqal Description:
Northinq IV) rftUSl Eastinq IX} rftUSl
Surface: 3703 FSL 1197 FEL S21 T11 N R12E UM 5958680.13 612048.97
W-205 OBc T2: 4170 FSL 1741 FEL S22 T11N R12E UM 5959219.64 616776.04
W-205 OBc T2.5: 4457 FSL 1492 FEL S22 T11 N R12E UM 5959510.00 617020.00
W-205 OBc T3: 4963 FSL 1271 FEL S22 T11 N R12E UM 5960020.00 617232.00
W-205 OBc T4: 51 FSL 1282 FEL S15 T11N R12E UM 5960387.00 617215.00
W-205 OBc T5: 657 FSL 1407 FEL S15 T11 N R12E UM 5960991.29 617079.63
W-205 OBc T6: 934 FSL 1488 FEL S15 T11 N R12E UM 5961267.00 616993.00
TO / BHL: 1869 FSL 1852 FEL S15 T11N R12E UM 5962196.00 616613.00
e
WellOesign Ver 3.1 RT-SP3.03-HF2.03 Bld( do31 rt-546 )
W-205\W-205\Plan W-205L 1 OBc\W-205L 1 (P4)
Generated 11/24/20039:01 AM Page 2 of 2
£'
o
o
';I:
§:
..-
II
Q)
ro
()
C/)
o
¡::
WELL
W-205L 1 (P4)
MagneticParametef'S
Model BGGM 2003
Dip' 80.808'
MagDec: +25.243'
400
4800
Date:
F$:
December 06. 2003 I
57558.2nT
800
1200
"H......',."........
KOP Crvjl 0/1 00 End Crv
Crv 10/100 , Crv 6/100 :
i7~~/ n~,;:'i~"
5200
400
''''"""''''''''''",''""
800
FIELD
Schlumberger
Prudhoe Bay Unit - WOA
STRUCTVRE W-PAD
SurfaœLocation
La\: N701745.811
LOfI W149S33.633
1600
",.............,.,.........
C'¡'6/100
\5 OBc T3 End crv~
Northing:
Easting;
NAD27 Al88ka State Planes, Zona 04, US Feet
5958660.13ftUS GridConv; +(1,85420613'
612048.97 nus Scale Fact: 0.9999142622
TVD Ref: Rotary Table (80.90 ft above MSl)
Srvy Date: November 21, 2003
Miscellaneous
Slot· W-205
Plan- W-205L1 (P4)
2000
2800
2400
..d.............,......,.
W.2050Bc:T4
jEnd Crv ¡
.",....«..,A................................".............
. Crv 6/100 :
":':':"\\ r" / /Ï-r;:
"'................................<,...".,.........,............,.
· .
· ,
· ,
· ,
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· ,
· .
· .
· .
· .
· .
i ro'·'~~\.i
"",,,.,,...............,,,".,"',, ","'.
.........
'"................"......".............""..
. ........."."..",....."'........
1200 1600 2000 2400 2800
Vertical Section (ft) Azim = 1.56°, Scale = 1 (in):400(ft) Origin = 0 N/-S, 0 EI-W
3200
3200
.-.................. ............
e
3600
4800
....--- .
5200
\"'"-r,¡.~)
3600
e
WELL
W-205L 1 (P4)
MagneticPararnelers
Model: BGGM 2003
Dip: 80.808'
Mag Dee: +25.243'
e
e
Schlumberuer
FIELD
Prudhoe Bay Unit - WOA
STRUCTURE W-PAD
NAD27 Alaska State Planas, Zone 04. us Feet
Northing: 5958680.13ftUS GridCorw: +0.85420613'
Easting: 612W8.97ftUS Scale Fact: 0.9999142622
Mi$Ol3llaoeous
Slot: W-205
Plan: W·20511{p4)
Su/faCelocation
Date: Deœmbef 06, 2003 Lat' N701745.811
FS: 57558.2nT Lon: W149533.633
^
^
^
z
e-
õ
o
'P
'2
=
~
II
()
C5
()
(/)
(/)
V
V
V
4500
5000
5500
3500
TD 14-112" L.þr
·.................·..t
3000
....H..H...".........,.....,........
~··ii,.."...í....'.H.....<....."......,,..,,...¿..,...........u......
¡ ~N ¡
¡ ./11' ¡
-jp- ~~
~.¡;':
~ . ._._c ._C_o__ ~" :
~;t~:::}:' :
· .
...............u,."...".......,...............,,,....................,,'...
· .
· .
· .
· .
· .
· .
2500
W-20S OBe T~
Cry 6/100 :
····..··t·····..·......·······..·..
mr=~;~-....\.
j;nd Cry
2000
r'"20S OBe T4
1500
.................................¡.............,,~.~.~1.0~.............
W-~5 OBe T3.?j'
i"d Cry
1000
I=~
Cl6/100
......T...............
· .-.
'" Odo........ ...............u. ..." '" '" ...ú.... ...... ....".. H'
· .
· .
· .
· .
· .
· .
W.2þS OBe 12.S ¡
500
~ End Crv
W·20S pBe 12
............ç.!Y.wJ.~~ ..........
End C~
o
W-205
· .
, . .
...........'"^^"'<''',......''',.....,^''',''......'^''''.........'''........"",...........,......,.....",,,..,,'",,^',
, < .
4500 5000 5500
<<< W Scale = 1(in):500(ft) E >>>
TVD Ref: Rotary Table (80.00 ft above MSI..)
Srvy Date: November 24. 2Q03
/
3500
3000
2500
2000
1500
1000
500
o
It
BPX AK
Anticollision Report
e
I Company: BP Amoco
Field: Prudhoe Bay
i Reference Site: PB W Pad Co-ordinate(~E) Reference:
¡ Reference Well: W-205 Vertical (TVD) Reference:
L~_e~e.~ence Wellpath: Plan W-205L 1 OBc c,~,_:c: .____,_,__ -c' _ _ .________
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 7176.65 to 10668.92 ft
Maximum Radius: 10000.00 ft
Date:
11/24/2003
Time: 09:19:36
l'aJ.:t~:
Well: W-205, True North
W-205 80.9
Reference:
Error Model:
Scan Method:
Error Surface:
I)b: Sybase
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 11/19/2003 Validated: No
Planned From To Survey
ft ft
138.20 7176.65 Survey#1 (138.20-10619.86) (2)
7176.65 10673.91 Planned: Plan #4 V1
Version: 2
Toolcode
Tool Name
MWD+IFR+MS
MWD+IFR+MS
MWD + IFR + Multi Station
MWD + IFR + Multi Station
Casing Points
.. .. .. .' -.- ,~". ,.. ,."..-
MD TVD Diameter Hole Size :'\lame
ft ft in in
n__ _...........__u.._.
3385.00 2766.10 10.750 13.500 10 3/4"
7176.65 5112.90 7.625 9.875 7-5/8"
1 0673.91 5187.90 4.500 6.750 4 1/2"
Summary
-,
<------------------- Offset Well path ---- > Reference Offset Ctr-Ctr :\ o-Go Allowable
Site Well Well path MI> MD Distance Area I)eviation Warning
ft ft ft ft ft
..-.----
PB W Pad W-01 Plan#3 W-01A VO Plan: 7176.65 9150.00 2468.95 169.61 2299.35 Pass: Major Risk
PB W Pad W-01 W-01 V3 7176.65 9150.00 2468.95 169.50 2299.46 Pass: Major Risk
PB W Pad W-02 W-02 V4 Out of range
PB W Pad W-02 W-02A V20 Out of range
PB W Pad W-03 W-03 V4 Out of range
PB W Pad W-03 W-03A V1 7176.65 10900.00 3460.20 216.57 3243.63 Pass: Major Risk
PB W Pad W-04 W-04 V1 Out of range
PB W Pad W-05 Plan W-05A (Rotary) VO Out of range
PB W Pad W-05 Plan#2 W-05L 1 VO Plan: Out of range
PB W Pad W-05 W-05 V3 Out of range
PB W Pad W-06A W-06A V2 Out of range
PB W Pad W-06 W-06 V1 Out of range
PB W Pad W-07 W-07 V1 Out of range
PB W Pad W-08 W-08 V1 7176.65 11100.00 4694.74 179.85 4514.89 Pass: Major Risk
PB W Pad W-08 W-08A V11 7176.65 11350.00 4950.26 171.81 4778.46 Pass: Major Risk
PB W Pad W-09 W-09 V1 Out of range
PB W Pad W-10 W-10 V3 Out of range
PB W Pad W-10 W-10A V4 Out of range
PB W Pad W-11 W-11 V1 Out of range
PB W Pad W-12A W-12A V3 Out of range
PB W Pad W-12 W-12 V1 Out of range
PB W Pad W-15 W-15 V1 7176.65 9050.00 2068.70 115.41 1953.29 Pass: Major Risk
PB W Pad W-15 W-15A V10 7176.65 9050.00 2068.70 115.41 1953.29 Pass: Major Risk
PB W Pad W-15 W-15PB1 V6 7176.65 9050.00 2068.70 115.41 1953.29 Pass: Major Risk
PB W Pad W-15 W-15PB2 V1 7176.65 9050.00 2068.70 115.41 1953.29 Pass: Major Risk
PB W Pad W-16 W-16 V3 7176.65 9650.00 3059.65 1 08.40 2951.25 Pass: Major Risk
PB W Pad W-16 W-16L 1 V3 7176.65 9650.00 3059.65 108.16 2951.49 Pass: Major Risk
PB W Pad W-17 W-17 V1 7188.65 7300.00 1351.94 146.62 1205.31 Pass: Major Risk
PB W Pad W-18 W-18 V1 Out of range
PB W Pad W-19 Plan#11 W-19AL 1 V1 Pia Out of range
PB W Pad W-19 W-19 V2 Out of range
PB W Pad W-19 W-19A V1 Out of range
PB W Pad W-200PB1 W-200PB 1 V7 Out of range
PB W Pad W-200 W-200 V6 Out of range
PB W Pad W-201 W-201 V4 10599.78 3850.00 4174.35 82.21 4092.14 Pass: Major Risk
PB W Pad W-203 W-203 V9 Out of range
PB W Pad W-203 W-203L 1 V7 Out of range
PB W Pad W-203 W-203L2 V3 Out of range
PB W Pad W-205 Plan W-205L2 OBa V2 PI 7196.82 7200.00 49.70 71.59 -21.89 FAIL: Major Risk ./
PB W Pad W-205 W-205 OBd V6 7199.99 7200.00 0.47 120.41 -119.94 FAIL: Major Risk
PB W Pad W-207 W-207 V10 7192.57 8250.00 2198.65 146.89 2051.76 Pass: Major Risk
PB W Pad W-207 W-207PB1 V2 Out of range
Company:
Field:
Reference Site:
Reference Well:
Reference Wellpath:
_n._......____
Summary
<-
Site
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
PB W Pad
BP Amoco
Prudhoe Bay
PB W Pad
W-205
Plan W-205L 1 OBc
Offset Wellpath
Well
W-209
W-209
W-20
W-211
W-212
W-215
W-215
W-21
W-21
W-22
W-23
W-23
W-24
W-25
W-26A
W-26
W-27
W-29
W-30
W-31
W-32
W-32
W-32
W-34
W-34
W-34
W-35
W-36
W-37
W-37
W-38
W-38
W-39
W-39
W-400
W-40
W-42
W-44
e
BPX AK
Anticollision Report
e
-->
Wellpath
W-209 V9
W-209PB 1 V6
W-20 V1
W-211 V8
W-212 V12
W-215 V7
W-215PB1 V2
W-21 V3
W-21A V12
W-22 V1
W-23 V3
W-23A V5
W-24 V1
W-25 V1
W-26A V6
W-26 V1
W-27 V1
W-29 V1
W-30 V1
W-31 V1
W-32 V5
W-32A PB1 V12
W-32A V3
W-34 V1
W-34A V1
W-34APB1 V1
W-35 V1
W-36 V1
W-37 V3
W-37A V3
W-38 V2
W-38A V1 0
Plan#4 W-39A VO Plan:
W-39 V1
W-400 V5
W-40 V1
W-42 V1
W-44 V1
Date: 11/24/2003 Time: 09:19:36
Co-ordinate(NE) Reference: Well: W-205, True North
Vertical (TVD) Reference: W-205 80.9
Reference Offset Ctr-Ctr No-Go Allowable
MD MD Distance Area Deviation
ft ft ft ft ft
---"..-
7681.72 7200.00 1412.85 110.47 1302.38
7176.65 9550.00 4182.86 96.78 4086.08
9477.93 7600.00 1146.10 87.60 1058.49
9040.72 13100.00 3814.23 84.47 3729.76
10480.84 8550.00 4818.03 102.75 4715.28
'II/:C: 2
Db: Sybase
Warning
,/
Pass: Major Risk
Out of range
Pass: Major Risk
Out of range
Out of range
Pass: Major Risk
Out of range
Out of range
Pass: Major Risk
Pass: Major Risk
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
---88
--60
30
-0
30
60
---88
- ------------"-------.--'-----------------.-
Field:
Site:
Well:
Wellpath:
Prudhoe Bay
PB W Pad
W-205
Plan W-205Ll OBc
o 00
27(}
180 88
Tmvellîng Cylinder Azimuth (TFOtAZI) [degJ vs Centre to Centre Separation [30ft/in]
-90
-_._-~..._-~_.
e
e
(e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well
branches are proposed from a single conductor, surface, or production casing, the applicant shall
designate one branch as the primary well bore and include all information required under (c) of this section
with the application for a Permit to Drill for that branch. For each subsequent well branch, the application
for a Permit to Drill need only include information under (c) of this section that is unique to that branch
and need not include the $100 fee.
20 AAC 25.005
PERMIT TO DRILL
e
.
TRANSMIT AL LETTER CHECKLIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLNAMEj1!4 Ú) -20S¿ /
PTD# ZO$~2c>1
CHECK WBA T
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
v
(If API number
last two (2) digits
are between 60~69)
"CLUE"
The permit is for a new wellbore segment of
existing wen~4 Ç.LJ-.2.0S
Permit No,.t...,r p//6 API No. ..("o-oz.'ì-.2..VC->
Productionsbould continue to be reported as
a function' of the original API number. stated
above.
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API Dumber (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/] 0/02
C\jody\templates
Tbe permit is approved subject to fuD
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing e:xception.
(Company Name) assumes the liability of any
protest to tbe spacing exception that may
occur.
All dry ditcb sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from wbere samples are first caught and
10' sample intervals tbrough target zones.
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, POLARIS OIL - 640160 Well Name: PRUDHOE BAY UN POL W-205L1 Program DEV Well bore seg ~
PTD#: 2032010 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal D
Administration 1 PßrmitJee attaçheJJ_ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . . _ _ . _ . . . . . Yes. _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _
2 _LeasßMmÞer _appropri¡¡te. _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yßs _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ . . _ _ . _ _ .
3 _U_nique well_n_amß_aod oumb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _Yßs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4 WellJocatßd ina_d_efil1eJJ.pool. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . Yes _ _ _ _ _ _ . _ _ _ _ _ . _ . _ _ _. _ _ _ _ _ _
5 WeJlloc¡¡tßd pr.oper _distance_ from driJling ul1itb_oUl1dal)'_ _ _ _ _ _ _ . . _ _ _ . . . Yßs _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6 Welllocatßd proper _distance from other welJs_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . _ _ Yßs _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _
7 _S_utfiçiel1t ¡¡çreage_ayail¡¡Þle indrilliog unjt _ . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . Yes _ _ _ _ _ _ _ _ . . _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
8 Jfdßviated, js_ weJIÞore platil1cJu_ded . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _
90-perator ol1ly affeçted party _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ _ Yßs _ _ _ _ _ . . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _
10 _O-per.ator bas_appropriate_Qond inJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yßs _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _
11 Pßrmit cao Þe issued wjtbout conservatiOI1 order _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Appr Date 12 Pßrmit c_ao Þe issued wjtbout admil1istratÍ\le_approvaJ _ _ . _ Y_es _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _
RPC 12/2/2003 13 Can permit be approved before 15-day wait Yes a
14 WeJllocated withil1 area alld_strataauthorized by_lojectioo Ordßr # (putlO# in_commßots)_ (For. _NA _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ .,
15 _AJI weUs_wit!1tn JI4_l1Jile_area_of reyiew jdßotified (For servjc_e we!! Ol1ly). _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
16 Pre-produ_ced iojeçtor; JJur¡¡tionof pre--proJJuetioo Ißss_ thall3 months (For_ser:vtce well onJy) _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _
17 _ACMPFïndjngofCon,Si,Steocy_h_as Þee_nJssuedfortbis projeçt _ . _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ . . . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _
Engineering
Appr Date
WGA 12/3/2003
Geology
Appr
RPC
Date
12/3/2003
Geologic
Commissioner:
J)TS
18 _C.ooductor string provided _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .NA _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ . _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
19 _S_urfacß casil1g protects alLknown_ USDWs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
20 _CMTvoladequateto çirc.ulateo_n_cOl1duçtor_& su_rfC,Sg _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _ _ _ _ _ _
21 _CMTvoladequatetotie-inJong.stringto_surfcsg_ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
22CMTwil! coyer_aJl kl1own-Pfodùctiye borizon_s_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . No_ _ _ _ _ _ _ _ Slotted, _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _
23 _C_asiog de_sigos adeClua_te for C,T, B_&_perl1Jafr_ost _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ . . _ _ _ _ _ _ _ _
24AJJequ¡¡tetankage_oJ re_serye pit _ _ _ _ _ _ _ _ _ _ _ _ _ Yßs _ _ _ _ _ _ _ \abors_9ES, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
25 Jf.aJe-JJrill" bas_a to-403 for ¡¡ÞandOllme_nt beßO ¡¡pproved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _NA _ _ _ _ _ _ Multilateral. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
26 _Mequ¡¡tewe!!bore separ¡¡tjo_n_pro-Posed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yßs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
27 Jf.djverter req.uired, does jt meet reguJatiol1s_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _NA _ _ _ _ _ _ _ Sidetraçk. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _
28 _Drilliogflujd_prQgramsc.hematic&.equipJistadequate_ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _. Yßs_ _ _ _MaxMW_9,2.ppgc _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ __
29 BOPEs,_dothey meetreguJa.tiOI1 . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _Yßs _ _ _ _ _ _ _ _ _ _ _ . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .
30 _BOPE_pressratiog appropriate;testto_(pu.t psig tn_commel1ts) _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ Yßs _ _ _ _ _ _ . Testto_3500_psi.MSF' 1723 psi._ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _
31 _C_hokel1Janifold çompJies w/API. RF'-53 (May 84)_ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ YßS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .
32 Work will occur withoutoperation _sbutdown_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yßs _ _ _ _ . . . _ _ _ _ . _ _ _ _ _ .
33 Js presence of H2S gas prob_aÞle _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ No _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _
34 Meçba_nicaLcoodJtiooof wells within ,ð.OR yerified (for.s.ervjce welJ only) _ _ _ _ _ _ _ . . . _ _ _ _ NA _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ . _ _ . _ _
·e
- - - - --
- - - - - -
35 Pßrmit c_an Þe issued w/o hydr.ogen. s_ulfide meas_ures _ _ YßS _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _
36 _D_atapreseoted on_ pote_ntial overpressure _ZOl1es _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . .
37Sßismic_analysJs_ of shaJIOW gaszooes _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ . _ _ _ _ NA _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
38Sßabedcondjtioo survey.(if off-sh_ore) _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
39 _ Conta_ct namelp!1oneJor_weelsly progress.reports [exploratOl)'onlYl . _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - --
- - - - - -
- - - - - - - - - - - --
- - - - - - - - - - - -
- - - - - - - - - - - --
- - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - - - -
Date:
Engineering
Commissioner:
Date
Public
Commissioner
~
Date /0