Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-211 • STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMIS ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well ❑ Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 195-211 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22035-60-00 7. Property Designation(Lease Number): ADL 0028328 .f'P1 1'f h LA 8. Well Name and Number: PBU 11-22AL1 1:1131-00Z832S su9F 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY.PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11824 feet Plugs measured feet true vertical 8988 feet Junk measured 10915 feet n' n 2017 Effective Depth: measured 9921 feet Packer measured See Attachment feet N true vertical 8335 feet Packer true vertical See Attachment feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20"91.5#H-40 29-108 29-108 1490 470 Surface 3904 13-3/8"68#L-80 28-3932 28-3499 5020 2260 Intermediate 5964 9-5/8"47#L-80 2227-8191 2144-6739 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED JUL 2 5 201 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 7 2100 250 1251 293 Subsequent to operation: 720 32359 479 1047 416 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ ❑ SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Chamansingh,Ann Marie Contact Name: Chamansingh,Ann Marie Authorized Title: Petroleum EngineerinContact Email: AnnMarie.Chamansingh@bp.co Authorized Signature: t:�C 0103er1G lam- t. IBd.-.0'1 Date: -1't 4- � T Contact Phone: +1 9075644070 Form 10-404 Revised 04/2017 VIL l 1 �� � � RBDMS \i"/ JUN 1 4 2017 Submit Original Only • • • Ass+0,0* • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED JUN 08 2017 RE: BP Exploration (Alaska), Inc. AOGCG Report of Sundry Well Operations Summary June 7, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for adding of Perforations for Well 11-22AL1, PTD # 195-211. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • Packers and SSV's Attachment PBU 11-22AL1 SW Name Type MD TVD Depscription 11-22AL1 TBG PACKER 7787.91 6427.31 4-1/2" HES TNT Perm Packer 11-22AL1 PACKER 7976.66 6573.84 7" TIW Liner Top PKR 11-22AL1 TBG PACKER 9721.13 8145.47 4-1/2" HES TNT Perm Packer 11-22AL1 PACKER 10858.62 8986.56 4-1/2" Top Packer • • a) ca 0. O o 0 0 0 0 0 0 CD o 0 0 CO O` O r O L N O C n d O 0 CO 1---•CO y 0 0 0 0 0 CDCDCDO 0 0 CDO I- CS) N CO N co co [;-; N N co Tr O a) a) N r- co 'c7 O O V Ln CO CO N- 00 CA CO CO O� (T CS) CO 00 C)) C) N CO N- ti CO CO M N CO 0) M N- CO CO 00 CO CO CO Cr) CO M CO CO ONO CO CO CO CO CO ONO 00 0 1 1 1 1 1 1 1 1 1 1 1 1 1 F 0) CO d' CO — ON- N CO CO CO N- C3) N N r- N t1' CO N N O) C) N O N N CO 00 co a) a) CO CO (1) 00N CO CO r) N O CO CO O co 0) t� a0 (A O CN x— 0) 00 O O _ CD CO D) co a) I� 0) a CA CA O CJ1111111111111 Q Qti N CO ao CA (N CO cN O) C10 (N CO A— ti O '4" - N v CO C) N NN CA co co 2 O CO co 1 N r-- O O O"I— "I— 0) CA Hm aO o Lc) co o o °D o co _ ao ao CL , co co Uao ° woo ° J J J 00 000 M M J M co co N LU CO• CO V N- *k # COSCCO • CCD C) co `— QD - - N N N N N U (A � a0w x— c— OM N CV ti N (N N N CS) CA N r NI- V �t d' Z rr C3) O CD LU 'Cr N- U) CCO N O M N- C)) CA — 0) co 0 0 CO O CO J M LC) N- ,,_°) C3) — W � Q W 1-1 .N U U U O u_ Ct Lt C CC CC c Z Z Z Z ct W W W W W W W W m m m Q D l— Z Z Z Z Z Z Z J D D U Z J J J J J J J I— II ! N CO m CO O C) - co 0 N- ci• "4Y CO = N N O M O M OO Lo r- p, N: O M M O) N CO Co Co N W 00 CD M CO to O CO CO CO CO O `t CO 1- co c0 co O) 0) o O) CA p co O O CO CO O OO OO O O > I- 0. 0 F- to N- cot N M N ti CO M = CO CO Cc) O N- Cn - O) M CO co 0 ti r,," CAOOCot- COCOco6o d NNCOO) v- N O 'f O O O O W O w CO CO O O O 0) CA CA cn o) > p 0 0 0 0 0 0 0 0 0 0 0 > 2 1- w x 0 0 o w z W p W 0 W OmLU m 5 g Y o O 0 m= O O O M O) O M M O O O O IJ-I 0 0 W LY W O N Cl) CO r- O O O N O J J J Q Q CA w ft +J 0_ 0 M M 0 V Co 1I O) O) O CU < < < u a a Z_ C 0000000000 .- = 0_ 0_ 0_ J W � O J O • W c- r- ,- '- c- Z Z Z = 000.. w JJJ a r U r = z 0QQ 0 0 0 .0 W W W a Q ZQ Q 2 2 2 O cn cn cn cn cn CU 4-0 N a F• 2 C = I- M M V 1- C°) N (0) M to O) Q ,- O N Cf) 1- - CO v- O .- N crCu OMMd' vLUCOC 0) OO 47. D0 0 0 O 0 0 0 0 0 0 v- LMM y v- s— . . . . . . . v- r- W ai O a 2 ct J = 10 0 a co J a ` 2 2 2 O cn cn cn cn cn W v 0 0 c o LL N N LL I.L LL N a O d a a ° O cn cn p cn o < W W < < < W a0 t o a m 0 oNCoCCOCOCOOLULUCOCD 0 0 o 0 0 o O O CA O 0 c o 0 0 0 0 0 0 M M rn rn w w z - O O N N N O M C j (�O CSO Omr_ w W N CL d ` r N N N \ 00 OHO N z - W 0 OW W LLW m 1` 1` ti LO LO Q 0 J I- J J J 0 CC a 0 Q aw ¢ co CO cnEl1i a L1.1 d c ,-,- ..-- ,---,-- ..---, = = = J J J J J J J J J J J 2 « « « « « <N N N N N N N N N N N N N N N N N N N N N m i l l i r III tit LL. a cn O CL N W LL. �- r- x- v- c- c- . . . . . m a a a 0 J (3 0 w a c- T- . . . . . . Q < COm LL. E Cn WO- a • • 4- c O W rir 0 °a II W Z ai a) m CO < D Q a 0 c 4- Z U - 0 Q W o O 2 N - Ct c- W W 11 Q J 70 O O V a ❑ = `ct) O U 0 Co II z H a) p O ti = c -a) J m Cl- - N : m 6 O -aO Q * 0O E O ❑ 0 a) t H C o .9 a W d ZLri O W I- o o ct O0 Z � � o o) w U � m7 Cl) cn H H ❑ Q coID Q HQ ❑ Q ❑ > 0 a) CC --^ c ai H a a) - CC = 0 Z 2 z W 0 Q c) 3 > < ca m Q H - Q Q - _ ..O W 2 -0 > L>LI _1 m (0 W 0 V) ¢ > NJU rn _ ❑ �, a) c ❑ 0 p ca ❑ o - O ZLuW ¢ II U) Z 2 .� O •C -D a) 73 z 2 u O CH = '0 .--(6m aO p CO H 0 v p a L ❑ ~ H O cr CU Q ate) ODtm- a a3 ❑ cA _p - � (� ❑ a) CI C/) H ❑ I-Q- 2 a) M J U) 3 . .= 0 U1 Q) . J U) N W W co W J H Q a) r' aI- _c o 5 a •� -Q p a' Q � " 3 Z 0ZaH 0 Q ❑ I` /,�-�W QH cn _c O H ai p w Od H a O N � -0VU � � -0J co m� N o c cW 0C W . a) z m aw �_ ZLo 0 15 (II 2650 N c 1§ � � ) m ,- DcL0 •`n mea XQO - a z - w c ' a) .tz c - J pia I- 00 i, - mHz O `�- r a) WD ❑ D TQ a) D 'tUfx ❑ C ,�. C b� i C * 0 = ❑ W O tl U U d a W Q p IQI J N O ¢ QO u) 0 m Q � _1 II IL -1Q 0 : m0H - -0 _ O > � ZC� o CL o wo Q I- J Q aa. * mgo = po 2 it 1:1 ---q : moo ± Y ° < E w ❑ Hco N 0 Jp ❑ z � aQ Q ❑ * SOY I` OJZ c °' v > ft w Jcfl II � ›' DC > 0 tr O II > ❑ ti n o •s2 - N H O ❑ 2 >,2 Q o > H = H C� J o Q >, N U C .. > O !Z N N O Z O U • H W z ¢ O c6 Q , `XSI� E -aMQ ~ ) I•� � 1E (N) half - s 3 � a � ❑ N > JQL�ij o0 Z xa � � ami o � Q x pa ami 3a � m � � o cp .- 66 -`---'. -) 25 JCA II � `6Z LOnIw- 0- ',I; ?j H O to U a O C a M LL H Q Oc\I p p U N r w Q LLI O Cr li Z co W ❑ It M O ❑ M m N m -- m ❑ LL (p J " H II 0 J ❑ `II J CI) W .- II Ln - §- O co O W II 6 ❑ ❑ xx Il a-I W II d � � w Jo _ > (`') c„) . \ _ LnLoOw2 _1a ow > a2QQQHwO 0 Z -I CD M II -� 0 O O II H ❑ m J (a C (!) 'd' U) LLI ❑ 2 0 < 0 O J W -J J fn J W Z O O z O J J p O U `� J J Q H H 0 W HYw II Q> dl•rIH cnO II Q !LOJ � w II Q W Q mY O J � u- U > O ES = 5LL SOQ E c = U z > O -c L. JV5Ow QO � J > � coy � t ~ _1 c) IY z � ❑ cn : H0_ c/ LL : ❑ .� : Hd. .2u _IW : Ha. d2u � * ZE � c) ❑ aa LL W H N- N- ti N. r- N. r- O O O O O 00 CV O H > o N N N N N N N Cr) CO N- � L) Lc) L) L) LLc) L) U Q • • N C O L a 2 N Li N 4- r O t O m Q a m 0 Co 0 c s m U z ( N- STDN m �r TREE= " CIW III WELLHEAD - CtW 11 �22A 11 .,, SA NOTES:WEL*ANGLE>70°@ 10710'•'° CHROME TBG&LNR MAX OLS:21.9"@ 10740' ACTUATOR= BAKER C ... BF ELEV 60' 20"CONDUCTOR, _.T L. ! :A, I 2179' J-- D 4-1/2"HES X NP, =3.813" KOP= 795' 91.5.A-538 , i. 4 Max Angle= 95'@ 11430 D=19.124" '1I GAS LFT MANORE.S [ tum Pd)= 10513 9 518"CSG STUB - 2234' '• , ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum ND= 8800'SS ,a 3 4034 3581 37 KGB-2 DOME BK 16 11/02/15 (10/01/15) 2 6305 5288 41 KGB-2 SO BK 20 11/02/15 13-3/8"CSG,68#,L-80,D=12.415" - 3939' ; + 1 7633 6307 39 KGB-2 DMY BK 0 10/29/15 47752' --J4-1/2"HES X NP,D=3.813' Minimum ID = 3.70" @ 11106' .• 4-1/2" TM NO-GO -MILLED 5 A;* 7788' -I' x 4-1/2"I- S TNTPKR,D=3.856" = 7820' -14-1/2"IES X NP,D=3.813" TOP OF 7"LNR H 79704 I ' 7"SCAB LNR,264,L-80 VAM TOR H 7975' j ii. '~ 7970' _-19-6/9-x 7"TNV LTP w TIEBACK SLV ,13=6 175" .0383 bpf,13=6.276" ► 7983' --I9-5/8"X 7"T1W LNR HGR,D=6.12" 9-5/8"CSG,474,L-80,D=8.681" -1 -8189 -- ,�r., MILLOUT V1II"DOW(11-22A) 8189'-8250' 14-1/2"TBG,12.6#,13CR-85 YAM TOP, -1 9640' 9655' -17"X 4-1/2"UNIQUE OVERSHOT .0152 bpf,D=3.958" ,'-'-- 6695' ,-14-1/2"HES X NP,D=3.813" 4-112"'TIEING STUB(10!25/15) H 9646' SHIFTED CUT DEPTH - ,. TN 9721' H7"X 4-1/2"HES T PKR,D=3.866" ' 9752' 14-1/2"HES X NP,MD=3.813" 9806' -17'X 5"BKR 2RH ZXP LW w TIEBACK SLV,D=3.958" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, 9811' 9811' H4-1/2"WLEG,D=3.958" 0152 bpf,D=3.958" =r 1 -f ELMD TT NOT LOGGED 7"LNR,29#,L-80 NSCT,.0371 bpf,D=6.184" J 9846' i l � � 9826' --{5"X 4-1/2-XO,D=3.958"1 1 7"MARKER JOINT 10074' 10835' -{4 112"LANDING COLLAR TOP OF 4-1/2"LNR H 1085T E—6 ' 10867' H7"X 4-1/2"TM/SSH PKR,D=4.0" ' 10908' 41-1/2-TTW X NP,D=3.813" KA S___,__�� 10913' -I4-1/2"PORTED PUP 17"LNR,29#,13CR NSCT,.0371 bpf,D=6.184" H 10910' I i PERFORATION sLM4ARY I 1 - 10999'1-4-1/2"T1W MLSA COMPOSITE JT,D=3.877" 1 1/i REF LOG:Z-DEN ON 07/22/95 ANGLE AT TOP PERF:NA MLLOUT WINDOW(11-22AL1) 11001'-11015' _ Note:Refer to Production DB for historical pert data SIZE I SPF INTERVAL Opn/Sqz SHOT SQZ _____ 11028' Hr G DEPLOY SUB,D=2.39" 11-22A ( _ PBTD H 11824' -SEE PAGE 2 FOR PERF SUMMARY-- _"-- _ _ /I I 1 11-22A L1 I i I 1 --- -SEEPAGE 2 FOR PERF SUMMARY- 0 - (JkMARY IN 11106' -4-1/2"TIW NO-GO, '1.1--22A/L 1 I FISH:_MILLS)PLUG&PUSHED DH(03/14/17) I-11133'CTMD I D=3.70"MILLED - .... :: 1-22 (03/14/17) 4-1/2"LNR,12.6#,13CR-BO NSCT, --1 11760' 2-7/8"SLOT!EU LW,6,5#, 11824' .0149 bpf,D=3.912" L-80 FL4S,D=2.441' DATE REV BY COMMBNTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/26/90 N28E ORIGINAL COMPLETION 03/15/17 JCF/JMD 1/I1E3 FISH&T1W NO GO(03/14/17) WELL_ 11-22A 08/02/95 D-16 SIDETRACK 05/11/17 MS/JMD ADPERFS(05/07/17) PERMIT No: 1950870/1952110 05/27/96 NORDIC CTD EXT.LINER(L1) API No' 50-029-22035-01 (60) 10/30/15€ D-14 RWO SEC 34,T11N,R15E,887'FNL&691'FWL 11/12/15 AW/JMO MAL ODE APPROVAL 12/01/15 RCT/JM3 MLLE°CMT/R.UG-SET FISH BP Exploration(Alaska) • 411 11 -22A / L1 ...r +.Y• I g,' 1 1 J/ Y ,., y i .y Y r v ,+ 1rY � tifY • 1 1 1 g g 1 1 7 I: . PBRORATION SUMMARY + REF LOG:Z-DEN ON 07/22/95 ',;; ANGLE AT TOP FE R:WA Note:Refer to Roduction DB for historical perf data „. SIZE SIF NTERVAL Opn/Sgz SHOT SQZ 11-22A 2-7/8" 6 10017- 10044 0 05/07/17 3-3/8" 6 10303- 10308 S 09/01/02 07/10/06 A II L 3-3/8" 6 10323-10328 S 05/11/02 07/10/06 IMMI 3-3/8" 6 10454- 10458 S 07/22/06 10/15/15 I I 3-3/8" 6 10477-10483 S 07/22/06 10/15/15 I I 3-3/8" 6 10513-10519 S 07/22/06 10/15/15 I I I I 2-7/8" 6 10662-10700 S 04/04/01 07/10/06 4-1/2" 10 10913-10993 SLOT 08/03/95 4-1/2" 10 11028-117371 SLOT 08/03/95 11-VA L1 2-7/8" 4 11029-11808 SLOT 05/26/96 r:_=_ _______`_ 1 I _`14.2zA / L'i=� 4 1-22 DTE REV BY 1 COMMENTS DATE REV BY GONMENTS 1 PRt.FDHOEB3AY MIT 04/26/90 N28E ORIGINAL COMPLETION 03/15/17 JCF/JMD MLLED RSH&11W NO GO(03/14/17) WELL: 11-22A 08/02/95 D-16 SIDETRACK 05/11/17 MS/JMD ADPERFS(05/07/17) PERMIT No: 1950870/ 1952110 05/27/96 NORDIC CTD EXT.LINER(LI) AR No: 50-029-22035-01 (60) 10/30/15 D•14 RWO I SEC 34,T11N,R15E,887'FNL&691'FWL 11/12/15 AW/JMD FtIAL ODE APPROVAL 12/01/15 RCT/JM)NLLED CMT/FLUG-SET FISH BP Exploration(Alaska) STATE OF ALASKA SILASKA OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATI®RS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing El Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing MChange Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well Il Re-enter Susp Well 0 Other:Scab Liner/Cement OA Il 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 195-211 3. Address: P.O.Box 196612 Anchorage, Development II Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22035-60-00 7. Property Designation(Lease Number): ADL 028325&028328 8. Well Name and Number: PBU 11-22AL1 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: Cement Evaluation PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11824 feet Plugs measured None feet true vertical 8988 feet Junk measured 10915',11036' feet DEC 15 2015 Effective Depth: measured 11824 feet Packer measured 7788',9721' feet O(��}l�Y � true vertical 8988 feet Packer true vertical 6427',8145' feet `s` Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 28-108 28-108 1490 470 Surface 3904 13-3/8" 27-3931 27-3498 5020 2260 Intermediate 5955 9-5/8" 2234-8189 2150-6738 6870 4760 Liner 7949 7" 26-10910 26-8989' 7240/8160 5410/7020 Liner 1195 4-1/2" 9806-11001 8227-8986 8430 7500 Liner 796 2-7/8" 11028-11824 8986-8988 10570 11160 Perforation Depth: Measured depth: 11029-11808 feet ACAS MA 2O1 t True vertical depth: 8986-8987 feet Tubing(size,grade,measured and true vertical depth) 4-1/2",12.6#,13Cr See Attachment See Attachment Packers and SSSV(type,measured and 4-1/2"HES TNT Packer 7788 6427 true vertical depth) 4-1/2"HES TNT Packer 9721 8145 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: Cut&Pull 4-1/2",12.6#,13Cr80 Tubing from 9945'.Cut and Pull 9-5/8",47#,L-80 Casing from 2234'.Run 7",26#,L-80 Tieback to 7975'.Cement w/430.1 Bbls,1.17 yield(2064 sx)Class 'G'.Run 4-1/2",12.6#,13Cr80 Scab Liner from 9806'-10863'.Cement w/45 Bbls,1.16 yield(218 sx)Class'G'. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 700 0 Subsequent to operation: 0 0 0 20 0 14.Attachments:(required per 20 AAC 25.070.25.071,s 25.283) 15.Well Class after work: Daily Report of Well Operations p Exploratory ❑ Development RI Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG 0 GINJ ❑ SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-488 Contact Warren,Abigail M Email Abigail.Warren@bp.com Printed Name Joe Lastuf Title Drilling Technologist Signature k Phone +1 907 564 4091 Date 1;416/15 Form 10-404 Revised 5/2015 1'TL c/ /it, V 1 RBDMS ! FC 717015 Submit Original Only • 11-22A/AL1, Well History (Pre-Rig Workover) ***WELL SHUT IN ON ARRIVAL***(SLB E-LINE TUBING CUT) INITIAL T/I/O =400/625/625 RIH W/ ELINE LOGGING TOOLS &3.65" POWER CUTTER CUT TUBING AT 9885' TIED INTO TUBING TALLY DATED 12-JULY-1995 FINIAL T/I/O =25/625/625 WELL LEFT SHUT IN UPON DEPARTURE - NOTIFIED PAD OP OF WELL STATUS 9/7/2015 ***JOB COMPLETE*** T/I/0=850/620/620 S/I Circ Out well (RWO EXPENSE) CMIT TxIA 1000 psi ***PASSED*** Pumped 4 bbls DSL to achieve test pressure of 1000 psi TxIA. 15 min loss of 23/23 psi, 30 min loss of 16/15 psi, for total loss of 39/38 psi in 30 mins. Pumped 2 bbls meth followed by 921 bbls 9.8 brine, 40 bbls DSL down TBG taking returns up IA to 11-16 FL. U-tube DSL TxIA for 500' FR DSO/WSL notified Tags hung on MV/IA AFE sign hung on MV***FLUID PACKED WELL*** Valve positions=SV WV SSV closed MV 9/11/2015 open CVs OTG Hardline SI/11-16 SV/WV closed FWHP=200/200/270 T/I/O=VACNAC/113. Pressured up tubing through the IA to 250 psi. Set 4" H TWC#295 through CIW tree at 132". ND upper tree and install DH #57 .Torqued and PT'd to API specs. (PASS) PB IA#52 , OA#01. Torqued and PT'd to API specs. (PASS) Bleed tubing 9/13/2015 to 0 Psi. through IA RDMO. ***Job Incomplete*** FWHP=0/0/113. Hung AFE sign and T/I/O =TWC/0/90. N/D 2-1/16" 0/A temp valve#1. Attempted to set 2" VR in 0/A, unable to set due to obstruction/debris in valve body(notified VSC). Installed tap blind & PT'd against closed 0/A gate valve(passed). Attempted to set 3" McEvoy VR plug in I/A(pad- 9/13/2015 side), unable to set VR plug. Bled 0/A to 0 psi. See log for details. ***Job incomplete*** T/I/O =TWC/0/0. PT'd Piggyback Temp Valve#1 300/low& 3500/high for 5 min each ( 9/14/2015 Passed ). RDMO ***Job Complete*** FWHP's =TWC/0/0 T/I/O=TWC/0/0 Removed existing 2" OA valve. Installed new 2" FMC 120 valve tag#34 9/14/2015 Installed piggyback OA valve Temp. #01 FWP's TWC/0/0 night crew to complete. T/I/O =TWCNac/0. Temp = SI. WHPs (Pre RIG). No AL, wellhouse, flowline or scaffolding installed. Dryhole tree and TWC installed. CV, MV = ?. IA, OA= OTG. 2100 hrs. 9/23/2015 S North America-ALASKA-BP Page 1 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'l 55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usf) 9/23/2015 19:00 - 00:00 5.00 MOB P PRE RIG DOWN OPERATIONS -PREP FOR RIG MOVE -PJSM FOR RIG MOVE OPERATIONS -SKID RIG FLOOR,MOVE OFF THE WELL. WSL VERIFIED PRESSURES ON WELL PRIOR TO MOVE OFF-0/0/0,T/IA/OA -SET RIG IN MIDDLE OF THE PAD AND WAIT FOR RIG MATS DUE TO OTHER RIG MOVE OPERATIONS. -SIM OPS:RIG MAKING MODIFICATIONS TO BEAVER SLIDE FOR CONTINUOUS IMPROVEMENT -MODIFICATION WILL ALLOW FOR SAFER RIG UP OF THE LARGER CASING TONGS 9/24/2015 00:00 - 06:00 6.00 MOB N WAIT PRE STAGE RIG ON LOCATION AT DS 02-21B -STAGE RIG ON LOCATION,WAIT FOR AVAILABLE RIG MATS DUE TO DOYON 16& NORDIC RIG MOVES -MAKE MODIFICATIONS TO RIG BEAVER SLIDE -RIG CREW CONDUCTING MP2 PREVENTITIVE MAINTENANCE OPERATIONS. 06:00 - 12:00 6.00 MOB N WAIT PRE RIG STAGED ON LOCATION AT DS 02-21B -WAITING ON RIG MATS FOR RIG MOVE -MODIFICATIONS TO THE BEAVER SLIDE -CREW PERFOMING PM'S -GENERAL HOUSE KEEPING AND MAINTENANCE 12:00 - 00:00 12.00 MOB N WAIT PRE RIG STAGED ON LOCATION AT DS 02-21B -WAITING ON RIG MATS FOR RIG MOVE -MODIFICATIONS TO THE BEAVER SLIDE -CREW PERFOMING PM'S -GENERAL HOUSE KEEPING AND MAINTENANCE 9/25/2015 00:00 - 04:30 4.50 MOB N WAIT PRE RIG STAGED ON LOCATION AT DS 02-21B -WAITING ON RIG MATS FOR RIG MOVE -MODIFICATIONS TO THE BEAVER SLIDE -CREW PERFOMING PM'S -GENERAL HOUSE KEEPING AND MAINTENANCE INSTALL REAR BOOSTER WHEELS **RIG MOVE COORDINATORS MOBILIZING MATS ON LOCATION AT DS2 FOR UPCOMING RIG MOVE.** -MOBILIZE THE RIG AROUND FROM THE BACK SIDE OF THE PAD TO THE FRONT.WILL STAGE ON THE FRONT SIDE TO WAIT FOR MORE MATS TO BE LAID. 04:30 - 07:00 2.50 MOB P PRE MOBILIZE RIG AROUND FROM THE BACK OF THE PAD TO THE FRONT. -MOVE AROUND THE PARKER RIG AND STAGE UNTIL MATS ARE READY TO MAKE FINAL MOVE TO DS-11 07:00 - 09:00 2.00 MOB N WAIT PRE WAIT FOR FINAL MATS TO BE PLACED TO COMPLETE RIG MOVE FROM DS2 TO DS11 Printed 11/11/2015 3:38:05PM • i North America-ALASKA-BP Page 2 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 08:00 - 20:00 11.00 MOB P PRE MOBILIZE RIG FROM DRILL SITE 2 TO DRILL SITE 11 -STOPPING AT SPECIFIC PLACES TO ALLOW FOR CREW CHANGE OUT AND FIELD CHANGE OUT. -RIG ON LOCATION ON THE FRONT END OF THE PAD AT 18:00, -ALLOW FOR CREW LUNCH,MOVE RIG FROM FRONT END OF PAD TO THE BACK *CPS NOTIFIED AND WITNESSED RIG MOVING THROUGH FS 2 FACILITY *24 HR BOPE TEST NOTIFICATION SUBMITTED AT 18:00 20:00 - 00:00 4.00 MOB P PRE RIG STAGED NEXT TO THE WELL. -REMOVE BOOSTERS AND CONNECTION BRACKETS. -STAGE MATS FOR FINAL RIG PLACEMENT -TRUCKS BRINGING FINAL LOADS FROM DS-02 9/26/2015 00:00 - 01:00 1.00 MOB P PRE CONT:REMOVE BOOSTER WHEELS AND BRACKETS -CONTINUE PREPING AROUND THE WELL FOR SPOTTING THE RIG 01:00 - 03:30 2.50 MOB P PRE PJSM AND BACK RIG OVER 11-22A. -LINE UP RIG ON MATS WITH WELL 11-22A -HOLD PJSM WITH CREW. -SET DRIVE SYSTEM TO"CREEP"MODE. -TEST MOVE SYSTEM ESD 20'FROM WELL. -BACK OVER WELL AND LINE UP ROTARY TABLE WITH WELL CENTER.LINE UP WITH WELLHEAD VERIFY WELL HEAD PRESSURES,T/I/O 0/0/0 -CONTACT DSO TO WITNESS RIG MOVING ONTO WELL 02-21 *DSO WAIVED WITNESS. 03:30 - 10:30 7.00 RIGU P PRE SKID RIG FLOOR INTO DRILLING POSITION. -HOOK UP SERVICE LINES TO RIG FLOOR -SPOT ROCK WASHER,RU CIRCULATION MANIFOLD -SPOT AND SECURE THE CREW MEETING TRAILER. -PJSM WITH RIG CREWAND HARD LINE CREW. -HARD LINE CREW,R/U HARD LINE FROM SKID MANIFOLD TO FLOWBACK TANK -HARDLINE CREW,PRESSURE TEST HARDLINE FROM SKID MANIFOLD TO FLOWBACK TANK TO 250/4,000 PSI FOR 5 CHARTED MINS EACH. -R/U COMMUNICATIONS IN WSL OFFICE. **RIG H2S SENARIO-REVIEWED DDI PROCEDURE FOR EMERGENCY RESPONSE& RIG EVACUATION. TEST AND CALIBRATE GAS ALARMS, ACTIVATE ESD ON RIG **RIG ACCEPTED AT 09:30** Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 3 of 69 Operation Sunimary Report Common Well Name:11-22 AFE No Event Type: .- ._ Date: Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 13:00 2.50 RIGU P PRE RIG UP AND TEST LUBRICATOR -PJSM WITH DSM REPS FOR TESTING LUBRICATOR,REMOVING TWC -PRESSURE TEST 250 PSI LOW,3500 PSI HIGH FOR 5 MIN—GOOD TEST. -REMOVE TWC TEST AND CALIBRATE GAS ALARMS, ACTIVATE ESD ON RIG 13:00 - 16:00 3.00 RIGU P PRE VOID DIESEL FROM TUBING/ANNULUS -PJSM AND RU FOR VOIDING DIESEL -PRESSURE TEST MUD LINES 250 PSI LOW/ 3500 PSI HIGH-GOOD TEST -PUMP 20 BBLS DOWN THE IA:CIRC 5 BPM WITH 1130 PSI/SHUT DOWN -PUMP 85 BBLS DOWN THE TUBING;CIRC 7 BPM WITH 1710 PSI -10 MINUTE FLOW CHECK—WELL BORE STATIC -BLOW DOWN TUBING LINES FREE OF FLUIDS **OA OPEN TO BLEED TRAILER AT 15:30 WILL REMAIN OPEN FOR UPCOMING CASING REPAIR** 16:00 - 21:30 5.50 RIGU P PRE -INSTALL AND TEST TWC -PJSM W1TH DSM REPS -RU LUBRICATOR AND TEST QTS—GOOD TEST -INSTALL TWC;PT FROM ABOVE 250 PSI LOW/3500 PSI HIGH FOR 5 MIN EACH— GOOD TEST -LINE UP AND PT FROM BELOW 250 PSI LOW /3500 PSI HIGH FOR 5 MIN EACH—GOOD TEST -BLEED OFF PRESS -RD LUBRICATOR,BLOW DOWN LINES FREE OF FLUID,FREEZE PROTECT FLOW BACK LINES AND CHOKE SKID 21:30 - 00:00 2.50 WHSUR P DECOMP NIPPLE DOWN TREE/ADAPTER FLANGE- PJSM FOR ND OPERATIONS-REVIEW DDI PROCEDURE- DISCUSS DROPPED OBJECT PREVENTION PLAN -PJSM WITH CAMERON REPS-REVIEWED SOP FOR VOIDING HANGER/BLEED DOWN CONTROL LINE -BLEED THE CONTROL LINE AND HANGER VOID. CLEAN AND INSPECT THE HANGER THREADS -MAKE UP TDS CROSS OVER-9-1/2 TURNS TO MAKE UP Printed 11/11/2015 3:38:05PM # • North America-ALASKA-BP Page 4 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/27/2015 00:00 - 02:00 2.00 WHSUR P DECOMP BLEED THE CONTROL LINE AND HANGER VOID. -PJSM WITH CAMERON AND ONCOMING DDI CREW. -CLEAN AND INSPECT THE HANGER THREADS -MAKE UP TDS CROSS OVER-9-1/2 TURNS TO MAKE UP -VERIFY MEASURMENTS WITH THE XO INSTALLED -MAKE UP 2'SPACE SPOOL 02:00 - 05:30 150 BOPSUR P DECOMP NU BOPE 13-5/8"5M N/U BOPE STACK -PJSM FOR N/U BOPE,DISCUSS LIFTING HAZARDS AND DROPPED OBJECTS. -C/O TURN BUCKLES ON THE STACK, INSTALL NEW COME-ALONGS -NU BOPE STACK WITH FOUR PREVENTER CONFIGURATION:ANNULAR,9-5/8"CASING RAMS,BLIND SHEARS,MUD CROSS,3-1/2"BY 6"VBR'S AND 2'SPACER SPOOL. - PJSM FOR MAKING UP CHOKE AND KILL LINES -NU CHOKE LINE AND KILL LINE. -INSTALL NEW LOW PRESSURE RISER INTO THE BELL NIPPLE Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 5 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 13:30 8.00 BOPSUR P DECOMP PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#315-488,AND GP 10-45. -PJSM,REVIEW DDI SOP AND PRESSURE CROSSCHECK WITH CONFIRMATION OF CORRECT RESPONSES. -VERIFY LINE UP AND FILL STACK AND CHOKE MANIFOLD. -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN. -TEST BLOWOUT PREVENTERS AND ALL ASSOCIATED BOPE. -LOWER 3-1/2"X 6"VBRs TESTED WITH 4" AND 4-1/2"TEST JOINTS. -UPPER 9-5/8"FIXED BORE RAMS TESTED WITH 9-5/8"TEST JOINT. -ANNULAR TESTED WITH 4"TEST JOINT. -BLIND/SHEAR RAMS TESTED -TEST CHOKE MANIFOLD VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES. -TEST MANUAL AND HYDRAULIC!BOP'S ON TOP DRIVE. -TEST FLOOR AND DART VALVES -PERFORM DRAW DOWN TEST OF ACCUMULATOR. -FUNCTION BOPE FROM REMOTE PANEL AND MAIN UNIT. -TEST GAS ALARMS. -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL *AOGCC GIVEN NOTIFICATION OF BOPE TEST 09/25/2015 @ 1755 HRS. *AOGCC INSPECTOR JEFF JONES WITNESSED BOPE TEST *OA PRESSURE REMAINS OPEN TO THE BLEED TRAILER. 13:30 - 15:30 2.00 BOPSUR P DECOMP RD TEST EQUP -RD/BLOW DOWN LINES FREE OF FLUID/ MU SAFETY JOINT 15:30 - 17:30 2.00 WHSUR P DECOMP RU DUTCH RISER/LUBRICATOR AND PRESSURE TEST -PJSM WITH DSM REPS -INSTALL LUBRICATOR W/QUICK TEST SUB -PT LUBRICATOR AND QUICK TEST SUB 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES EACH-GOOD LEAK TIGHT TEST -PULL TWC-0 PSI ON WELL -RIG DOWN LUBRICATOR/DUTCH RISER/ LD TOOLS AND EQUIPMENT 17:30 - 19:30 2.00 WHSUR P DECOMP MOBE 4-1/2"HANDLING EQUIPMENT TO RIG FLOOR -PJSM BEAVER SLIDE OPS Printed 11/11/2015 3:38:05PM • 11110 North America-ALASKA-BP Page 6 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 00:00 4.50 WHSUR P DECOMP UNSEAT HANGER -PJSM WITH CIW—REVIEWED THEIR SOP FOR BOLDS AND PULLING HANGER -CIW BOLDS - PULL 170K TO UNSEAT HANGER;FREE PULLED 165K WITH SIGNS OF DRAG -PU 4',SHUT IN ANNULAR AND CBU THROUGH MUD GAS SEPERATOR;CIRC 2 BPM WITH 800 PSI -OBSERVED STRING WEIGHT DECREASING, SHUT DOWN BLED OFF PSI -OPENED ANNULAR,SUCKED OUT BOP STACK -PULLED HANGER ABOVE THE ANNULAR / FREE PULL @ 165 K -SHUT IN ANNULAR AND CIRC THRU MGS— 6 BPM W/330 PSI, -MW-9.6 PPG IN/OUT 9/28/2015 00:00 - 01:30 1.50 WHSUR P DECOMP CONT CBU THRU MGS -WITH 6 BPM,330 PSI,TOTAL 460 BBLS -MW 9.8 PPG BRINE IN OUT -10 MIN FLOW CHECK WELL—WELL STATIC -LAY DOWN THE TBG HANGER AND PUPS, C/O ELEVATORS -WELL OUT OF BALANCE 01:30 - 02:30 1.00 WHSUR P DECOMP CIRCULATE WELL WITH 9.8 PPG BRINE -MAKE UP XO TO NSTC XO AND TIW,MAKE UP TOP DRIVE -PUMP ADDITIONAL TUBING VOLUME FOR TOTAL SURFACE TO SURFACE. -8 BPM WITH 440 PSI -MW 9.8 PPG IN/OUT -10 MIN FLOW CHECK.-WELL STATIC NO MOVEMENT. -RECORD SPR'S AT 30&40 SPM -BLOW DOWN TOP DRIVE AND CHOKE. 02:30 - 06:00 3.50 PULL P DECOMP PULL AND LAY DOWN 4-1/2"#12.6 NSCT 13CR-80 COMPLETION TUBING -PJSM FOR LAYING DOWN TUBING,REVIEW DDI PROCEDURE,DISCUSS AND AGREE ON DISPLACEMENT VOLUMES TO BE USED FOR TRIP SHEETS. -POOH F/9,850 AT JOINT 49, CONTROL LINE CAME THRU TABLE PARTED -CONT LD 4-1/2"#12.6 TUBING TO SSSV AT 7661'—PUW 130K -FOUND REST OF CONTROL LINE AT BOTTOM PUP ON SSSV -MONITOR TRIP DISPLACEMENT ON TRIP TANK,CORRECT HOLE FILL OBSERVED. 06:00 - 07:00 1.00 PULL P DECOMP LD CONTROL LINE SPOOLER -PJSM FOR BEAVER SLIDE OPS -LD SPOOLER AND BALL OF CONTROL LINE 07:00 - 12:00 5.00 PULL P DECOMP CONT LAYING DOWN 4-1/2"#12.6 13 CR-80 COMPLETION TUBING -TOOL BOX MEETING—LD TUBING F/7661'T/ 2125' PUW=70K SOW=75K -MONITOR TRIP DISPLACEMENT ON TRIP TANK,CORRECT HOLE FILL OBSERVED. 12:00 - 12:30 0.50 PULL P DECOMP RIG SERVICE -LUBRICATE RIG -GREASE TOP DRIVE AND BLOCKS Printed 11/11/2015 3:38:05PM • i North America-ALASKA-BP Page 7 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/lime:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 14:30 2.00 PULL P DECOMP CONT LD 4-1/2"#12.6 13CR-80 NSCT TUBING -POOH WITH 4-1/2"TUBING F/2125'T/6' -RECOVERED 244 FULL JOINTS,1 SSSV,3 GLM'S,1 CUT JOINT 6.62" -RECOVERED 28 OF 30 SS BANDS -FLARE ON CUT JOINT 4-3/4" -MONITOR TRIP DISPLACEMENT ON TRIP TANK,CORRECT HOLE FILL OBSERVED. 14:30 - 17:30 3.00 BOPSUR P DECOMP CLEAN&CLEAR RIG FLOOR -PJSM AND FUNCTION BOPS TO CHECK FOR DEBRIS-ALL CLEAR NO DEBRIS NOTED -MOBILIZED BOT POLISHED MILL ASSEMBLY BHA TO RIG FLOOR -INSTALL WEAR RING-ID=12-1/4", RILDS X 4,BY 17:30 - 19:30 2.00 FISH P DECOMP PU MU 7"POLISH MILL ASSY -PJSM WITH BOT REPS 1-TIW POLISH MILL,4-BOOT BASKETS,1-BIT SUB,1-UPPER STRING MILL,1-BUMPER SUB,6-4-3/4"DC'S -TOTAL LENGTH OF BHA=228.66 -RIH WITH 7"TIW DRESS OFF BHA T/228' 19:30 - 00:00 4.50 FISH P DECOMP PU DP FROM PIPE SHED SINGLE IN THE HOLE WITH POLISH MILL ASSY F/228'TO 2,386' -PJSM FOR PICKING UP SINGLES FROM THE PIPE SHED -PU RIH F/228'MD T/2386'MD PUW=90K SOW=90K -MONITOR TRIP ON THE TRIP TANK- CORRECT DISPLACEMENT OBSERVED -MW-9.8 PPG BRINE AT 2,286'BIT DEPTH,TAGGED UP WITH 15-25 K WOB,PU AND HAD 15K OVER PULL -WORKED STRING UP AND BACK DOWN SEVERAL TIMES,HANGING UP IN THE SAME PLACE. -PUMPS ON WITH 6 BPM,510 PSI,WORKED STRING THROUGH OBSTRUCTION WITH 35K, PULLED BACK UP THRU WITH 10 K OVER PULL CONVERSATION WITH ODE,DECISION TO ROTATE AND CLEAN UP OBSTRUCTION. -MU TOP DRIVE AND CIRCULATE 7 BPM W/ 560 PSI,30 RPM W/1K TORQ,ROT 91K, WORK STRING FROM 2386'MD T/2425' -TAGGED UP AGAIN WITH 10K WOB W/3-4K TORQ,CONT WORKING THE STRING F/2425' MD T/2381'MD, -PUMPS OFF AND ROTARY OFF;WORK THRU AREA WITH 3-5 OVER PULL @ 2386'MD -WAS ABLE TO CLEAR OBSTRUCTION WITH 3-5K GOING DOWN AND SAME COMING BACK UP 9/29/2015 00:00 - 00:30 0.50 FISH P DECOMP CONTINUE TO WORK BHA#1 DOWN FROM 2,386'TO 2,431'MD. -WORK THROUGH TIGHT SPOTS WITH NO ROTATION AND NO RECIPROCATION. -PUW=90K.SOW=90K. 00:30 - 01:00 0.50 FISH P DECOMP SERVICE RIG:SERVICE AND INSPECT TOP DRIVE,DRAWWORKS AND SKATE. Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 8 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 05:30 4.50 FISH P DECOMP PU DP FROM PIPE SHED SINGLE IN THE HOLE WITH POLISH MILL ASSY F/2,431'TO 4,275'MD. -MONITOR TRIP ON THE TRIP TANK- CORRECT DISPLACEMENT OBSERVED. -PUW=115K.SOW=105K. -RESTRICTION AT 4,276',25-30K DOWN WEIGHT TO GET DOWN AND BACK UP. -PUMP ON WITH 6.5 BPM,580 PSI,30 RPM, W/1K TO. -WORK STRING THROUGH OBSTRUCTION 3X. -SHUT DOWN PUMP AND ROTARY. -WORK STRING PAST W1TH 10K DOWN AND 12K UP. -CONTINUE IN THE HOLE TO 4,312'AND WORK PIPE AGAIN USING SAME STEPS. -CONTINUE IN THE HOLE TO 4,438'MD AND SET DOWN 25KTWICE. -INCREASE WEIGHT ON MILL TO 35K,PU 30K OVER TO PULL FREE. -STOP OPERATIONS,SECURE WELLAND DISCUSS PLAN FORWARD WITH ANCHORAGE. -MW=9.8 PPG BRINE. 05:30 - 09:30 4.00 FISH P DECOMP PJSM AND PULL OUT OF THE HOLE WITH BHA #1,POLISH MILL ASSY FROM 4,438'MD TO 46' MD. -MONITOR WELL FOR 10 MIN OFF BOTTOM- STATIC. -PULL ON ELEVATORS,STANDING BACK DRILL PIPE IN DERRICK. -MONITOR WELL FOR 10 MIN PRIOR TO PULLING NON-SHEARABLES INTO THE STACK (DRILL COLLARS)-STATIC. -STAND BACK DRILL COLLARS IN DERRICK. 09:30 - 10:30 1.00 FISH P DECOMP PJSM AND LAY DOWN BHA#1,POLISH MILL ASSY,PER BAKER REPRESENTATIVE. 10:30 - 11:00 0.50 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR OF ALL BHA COMPONENTS NOT NEEDED FOR THE NEXT RUN. MOBILIZE NEW BHA COMPONENTS TO THE RIG FLOOR. 11:00 - 12:00 1.00 FISH P DECOMP PJSM AND RECONFIGURE TIW POLISH MILL ASSY. -REPLACE TIW UPPER DRESS MILL WITH BAKER UPPER DRESS MILL. -LD 8-1/2"OD STRING MILL. -TIW POLISH MILL ASSY,XO,PIN X PIN SUB, 3 BOOT BASKETS,BIT SUB,BUMPER SUB, PUMPOUT SUB,XO,(6)4 3/4"DRILL COLLARS. -OAL=222.79'. 12:00 - 17:30 5.50 FISH P DECOMP RUN IN THE HOLE WITH BHA#2,POLISH MILL ASSY ON STANDS OF DRILL PIPE FROM 222' TO 4,401'MD -NO INDICATIONS OF TIGHT SPOTS. -PU 118K;SO 105K AT 4401'MD. CONTINUE TO RUN IN THE HOLE WITH BHA #2,PICKING UP DRILL PIPE 1 X 1 FROM THE PIPE SHED FROM 4,401'TO 7,943'MD. Printed 11/11/2015 3:38:05PM • I North America-ALASKA-BP Page 9 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.3ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:00 0.50 FISH P DECOMP DRESS OFF 7"LINER TIE-BACK SEAL BORE. -OBTAIN PARAMETERS:PUW=175K.SOW= 130K AT 7,943'MD. -TAG NO-GO AT 7979'MD(7"LINER TOP AT 7974'MD). -PICK UP AND ESTABLISH MILLING PARAMETERS. -6 BPM WITH 780 PSI. -80 RPM WITH 4K FT-LBS TORQUE;ROT= 150K. -WORK POLISH MILL 7"LINER TOP AND DRESS OFF TIE-BACK SLEEVE WITH 5K WOB FOR 5 MIN PER BAKER FISHING REPRESENTATIVE. 18:00 - 19:00 1.00 FISH P DECOMP CIRCULATE HIGH VIS SWEEP. -CONTINUE TO ROTATE AND RECIPROCATE 30'OF STROKE. -12 BPM WITH 2760 PSI. -NO INCREASE IN RETURNS WITH SWEEP AT SURFACE. 19:00 - 19:30 0.50 FISH P DECOMP MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM-STATIC. SIMOPS: -BLOW DOWN TOP DRIVE. -LINE UP ON TRIP TANKS. -WSL VERIFY DISPLACEMENTS ON TRIP SHEETS. 19:30 - 22:30 3.00 FISH P DECOMP PULL OUT OF THE HOLE WITH BHA#2, POLISH MILL ASSY,FROM 7,970'MD TO 222' MD STANDING BACK DRILL PIPE. 22:30 - 00:00 1.50 FISH P DECOMP PJSM AND LAY DOWN BHA#2,POLISH MILL ASSY. -MONITOR WELL FOR 10 MIN PRIOR TO PULLING NON-SHEARABLES INTO THE STACK (DRILL COLLARS)-STATIC. -STAND BACK 4 3/4"DRILL COLLARS. -LAY DOWN BHA. -CLEAN OUT BOOT BASKETS. -RECOVERED-1/2 GAL METAL SHAVINGS AND SCHMOO. -GOOD WEAR INDICATIONS ON MILL. 9/30/2015 00:00 - 01:30 1.50 FISH P DECOMP PJSM AND CLEAN AND CLEAR RIG FLOOR OF BHA#2 COMPONENTS NOT NEEDED. MOBILIZE BHA#3 COMPONENTS TO RIG FLOOR. 01:30 - 02:00 0.50 FISH P DECOMP PJSM AND PICK UP BHA#3,7"TIW SEAL ASSY. -SEALS,7"PUP JT,(2)XO,15'SPACE OUT PUP. -OAL=39.86'. 02:00 - 06:00 4.00 FISH P DECOMP RUN IN THE HOLE WITH BHA#3,7 TIW SEAL ASSY -RIH ON STANDS OF DRILL PIPE FROM 40'TO 7,824'MD. -MW IN/OUT=9.8PPG. Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 10 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:30 2.50 FISH P DECOMP PJSM AND SLIP AND CUT DRILL LINE. -HANG BLOCKS.SLIP AND CUT 50'OF DRILL LINE. -INSPECT DRAWWORKS BRAKE LINKAGE. -INSPECT SAVER SUB.CALIBRATE BLOCK HEIGHT.TEST CROWN-O-MATIC. 08:30 - 09:30 1.00 FISH P DECOMP CONTINUE TO RUN IN THE HOLE WITH BHA #3,7"TIW SEAL ASSY TO 7975'MD. -RUN IN THE HOLE PICKING UP DRILL PIPE FROM THE PIPE SHED. -LOCATE PBR AND TAG NO-GO ON 7"LINER TOP WITH 5K DOWN AT 7975'MD. -MW IN/OUT=9.8 PPG. 09:30 - 15:30 6.00 FISH P DECOMP ATTEMPT TO PRESSURE TEST 7"LINER, PRODUCTION PACKER AND PLUG IN 4 1/2" TAIL PIPE TO 3500 PSI. -PICK UP TO STRING WEIGHT AND SET SLIPS. -PRESSURE UP TO 250 PSI FOR 5 CHARTED MIN:GOOD TEST -PRESSURE DROPPED OFF AT 850 PSI WHILE ATTEMPTING TO BRING UP TO HIGH PRESSURE. SLACK OFF TO THE NO-GO AND ATTEMPT TO TEST AGAIN. -FLUID LEAKED BY SEALS ON HIGH PRESSURE TEST AT 1550 PSI. -PICK UP ANOTHER JOINT OF DRILL PIPE AND SET 15K DOWN ON NO-GO AND ATTEMPT TO TEST AGAIN. -FLUID LEAKED BY SEALS ON HIGH PRESSURE TEST AT 1550 PSI. DISCUSS WITH ODE AND BAKER FISHING REPRESENTATIVES HELD ANOTHER PJSM WITH RIG CREW -CLOSE ANNULAR AND PRESSURE UP ON THE 9 5/8"x 4"ANNULUS TO 1500 PSI -ATTEMPT TO PRESSURE TEST WHILE HOLDING PRESSURE ON THE BACKSIDE -PRESSURE UP TO 3600 PSI;STILL LEAKING BY. -BLEED OFF PRESSURE ON DRILL PIPE AND EQUALIZE PRESSURE ON IA. -OPEN ANNULAR AND FLOW CHECK WELL FOR 10 MIN;STATIC. 15:30 - 20:00 4.50 FISH P DECOMP PJSM AND PULL OUT OF THE HOLE WITH BHA #3,7"TIW SEAL ASSY -BLOW DOWN CHOKE AND KILL LINES -BLOW DOWN TOP DRIVE AND LINE UP ON TRIP TANK -VERIFY DISPLACEMENTS WITH PIT WATCHER AND DRILLER FOR TRIP OUT OF THE HOLE -PULL OUT OF THE HOLE,STANDING BACK DRILL PIPE IN THE DERRICK. -INSPECT AND LAY DOWN 7"TIW SEAL ASSY -UPPER TWO SEAL SECTIONS DAMAGED ON TIW SEAL ASSY -MISSING 5 TEFLON RINGS AND 11 CHEVRON SEALS. Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 11 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292203500 Active datum:11-22A KBE 55.3'©55.30usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase r Description of Operations (hr) (usft) 20:00 - 00:00 4.00 FISH P DECOMP USIT LOG FROM 4150'TO SURFACE -PJSM WITH SLB E-LINE CREWAND RIG UP E-LINE -MAKE UP USIT TOOL STRING,36.13'OAL -USIT-E,CTEM AND CCL -RUN IN THE HOLE WITH E-LINE TO 4150' AND LOG TO SURFACE AT 60 FT/MIN SIMOPS: -CHANGE OUT EZ-TORQUE CABLES ON RIG FLOOR -INSPECT MUD PUMP#1 -CLEAN AND PAINT AROUND RIG. 10/1/2015 00:00 - 01:00 1.00 FISH P DECOMP I CONTINUE USIT LOG FROM 4150'TO SURFACE AND RIG DOWN E-LINE -FINISH LOGGING TO SURFACE AT 60 FT/MIN -PJSM WITH SLB E-LINE CREWAND RIG DOWN E-LINE -LAY DOWN USIT TOOL STRING AND RIG DOWN SLB E-LINE CREW 01:00 - 01:30 0.50 FISH P DECOMP SERVICE TOP DRIVE AND DRAWWORKS 01:30 - 08:00 6.50 FISH P DECOMP PJSM,MAKE UP AND RUN IN THE HOLE WITH 7"HES RBP ON DRILL PIPE TO 8050'MD -90'/MIN MAX RUNNING SPEED 08:00 - 08:30 0.50 FISH P DECOMP SET 7"HES RBP AT 8050'MD -PUMP 5 BPM;400 PSI AND WORK RBP THROUGH SETTING DEPTH SEVERAL TIMES. -PUMPS OFF AND ESTABLISH PARAMETERS: -PU 177K;SO 125K -SET RBP CENTER OF ELEMENT AT 8050'MD -SET DOWN 20K TO CONFIRM SET -PICK UP 10K OVER AND CONFIRM RPB SET. -RELEASE FROM RBP AND PICK UP 20'AND GO THROUGH SETTING PROCEDURE AGAIN TO CONFIRM RELEASED FROM RBP. 08:30 - 10:00 1.50 FISH P DECOMP PRESSURE TEST RBP TO 250/1000 PSI FOR 5 CHARTED MIN EACH. -PJSM WITH RIG CREW -RIG UP TEST EQUIPMENT AND PRESSURE TEST 250 PSI LOW/1000 PSI HIGH FOR 5 MIN EACH -TEST MET OPERATIONAL ASSURANCE CRITERIA -BLOW DOWN AND RIG DOWN TEST EQUIPMENT 10:00 - 12:30 2.50 FISH P DECOMP DUMP 50'OF SAND ON TOP OF RBP -PJSM WITH RIG CREW -MOBILIZE SAND HOPPER AND SAND TO RIG FLOOR -DUMP 23 SACKS OF SAND AT 1 MIN PER SACK DOWN DRILL PIPE -CIRCULATE DRILL STRING VOLUME AT 2 BPM;30 PSI. -10 MIN FLOW CHECK:STATIC Printed 11/11/2015 3:38:05PM • I North America-ALASKA-BP Page 12 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 16:00 3.50 FISH P DECOMP PULL OUT OF THE HOLE AND LAY DOWN RUNNING TOOL -PJSM,BLOW DOWN TOP DRIVE AND LINE UP ON TRIP TANK -VERIFY DISPLACEMENTS WITH PIT WATCHER AND DRILLER FOR TRIP OUT OF THE HOLE -PULL OUT OF THE HOLE,STANDING BACK DRILL PIPE IN THE DERRICK,FROM 7992'MD TO SURFACE 16:00 - 16:30 0.50 FISH P DECOMP ATTEMPT TO PRESSURE TEST 9 5/8"CASING, 7"RBP W/SAND AND 7"LINER TOP TO 250 PSI/3500 PSI FOR 5 CHARTED MIN EACH. -PJSM WITH RIG CREW. -RIG UP TEST EQUIPMENT,CLOSE BLIND SHEAR RAMS -PRESSURE UP TO 250 PSI LOW FOR 5 CHARTED MIN;GOOD TEST -PRESSURE UP TO 3600 PSI;PRESSURE FAILS TO STABILIZE -PUMP 6.7 BBLS TO PRESSURE UP;BLED BACK 6 BBLS -NOTIFY ODE OF FAILED TEST. 16:30 - 17:30 1.00 FISH. P DECOMP MOBILIZE 8 1/4"MULTI-STRING CUTTER ASSY DRESSED FOR 9 5/8",47"CASING TO RIG FLOOR -PJSM WITH RIG CREW SIMOPS: -PJSM AND BLOW DOWN CHOKE AND KILL LINES -RIG DOWN TEST EQUIPMENT 17:30 - 20:30 3.00 FISH P DECOMP MAKE UP MULTI-STRING CUTTER ASSY AND RUN IN THE HOLE TO 2197'MD -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -OBTAIN PARAMETERS: -PU 83K;SO 83K -140 PSI @3BPM;560PSI c 5.5 BPM -80 RPM;1K FT-LBS TORQUE;ROT 85K -CONTINUE IN THE HOLE WITH PUMPS OFF TO JUST ABOVE COLLAR AT 2227'MD -LOCATE COLLAR WITH CUTTER KNIVES AT 2227'MD;3 BPM -PICK UP AND VERIFY COLLAR DEPTH A SECOND TIME -SHUT DOWN PUMPS AND RUN IN THE HOLE 7'PAST THE COLLAR TO CUT DEPTH -PLANNED CUT DEPTH 2234'MD Printed 11/11/2015 3:38:05PM S North America-ALASKA-BP Page 13 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor DOYON DRILLING INC. UVVI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:00 1.50 FISH P DECOMP CUT 9 5/8"CASING AT 2234'MD PER BAKER FISHING REPRESENTATIVE -PJSM WITH RIG CREW,BAKER FISHING AND LITTLE RED SERVICES -VERIFY LINE-UP TO LITTLE RED SERVICES AND REVIEW PRESSURE CROSSCHECK CHECKLIST -PRESSURE TEST LINES TO LITTEL RED 250/3500 PSI-GOOD TEST -CUT 9 5/8"CASING PER BAKER FISHING: -6.5 BPM;910 PSI;100 RPM;1-5K FT-LBS TORQUE -START CUT AT 21:38;CUT THROUGH CASING AT 21:48 -POSITIVE INDICATION OF CASING CUT -OA PRESSURE 10 PSI PRIOR TO CUT AND 230 PSI AFTER CUT 22:00 - 00:00 2.00 FISH P DECOMP CIRCULATE OUT OA FLUIDS FROM 9 5/8" CASING CUT -CIRCULATE 25 BBLS OF HEATED DIESEL DOWN THE DRILL STRING -1.5 BPM;56 PSI -CLOSE THE ANNULAR AND OPEN UP THE OA TO THE FLOW BACK TANK -PUMP 75 BBLS OF HEATED DIESEL -1.5 BPM;270 PSI -PUMP 25 BBLS HEATED 9.8 PPG BRINE TO CLEAR THE DRILL PIPE -2 BPM;105 PSI -SHUT DOWN AND CLOSE IN THE OA AND ALLOW THE DIESEL TO SOAK FOR 1 HR. 10/2/2015 00:00 - 02:00 2.00 FISH P DECOMP CONTINUE TO CIRCULATE OUT OA FLUIDS FROM 9 5/8"CASING CUT -CONTINUE TO ALLOW DIESEL TO SOAK(1 HR AT 00:30) -CIRCULATE 105 BBLS OF HEATED 9.8 PPG BRINE,TAKING RETURNS TO THE FLOW BACK TANK -5 BPM;40 PSI ICP;450 PSI FCP. -CIRCULATE 40 BBL DEEP CLEAN PILL. -CIRCULATE 160 BBLS HEATED 9.8 PPG BRINE -7 BPM:830 PSI ICP;820 PSI FCP -FLOW CHECK THE WELL FOR 10 MIN;NO PRESSURE,NO FLOW -OPEN THE ANNULAR AND CLOSE IN THE OA TO THE FLOW BACK TANK -PUMP 130 BBLS OF HEATED 9.8 PPG BRINE TO CLEAR THE 4"x 9 5/8"ANNULUS -12 BPM;1200 PSI. 02:00 - 04:30 2.50 FISH P DECOMP PULL OUT OF THE HOLE AND LAY DOWN MULTI-STRING CUTTER ASSY FROM 2230'MD TO SURFACE -PJSM WITH RIG CREW -FLOW CHECK WELL FOR 10 MIN;STATIC -LAY DOWN MULTI-STRING CUTTER ASSY AND CLEAR RIG FLOOR. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 14 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 05:00 0.50 WHSUR P DECOMP PJSM,PREP FOR NIPPLING DOWN THE BOP STACK -DRAIN STACK -BLOW DOWN CHOKE,KILL,AND HOLE FILL LINES -PULL AND LAY DOWN WEAR RING 05:00 - 09:00 4.00 WHSUR P DECOMP NIPPLE DOWN THE BOP STACK AND TUBING SPOOL -PJSM WITH RIG CREWAND WELLHEAD REPRESENTATIVE -REMOVE RISER,MOUSE HOLE,AND DISCONNECT KILL LINE -OPEN OA TO BLEED TRAILER -BLEED OFF VOID PRIOR TO NIPPLING DOWN TUBING SPOOL -NIPPLE DOWN THE BOP STACK AND TUBING SPOOL -RACK BACK BOPE ON TO THE STUMP -REMOVE PACK OFF FROM TUBING SPOOL SIMOPS: -MOBILIZE SPEAR ASSEMBLY TO RIG FLOOR -PERFORM DERRICK INSPECTION 09:00 - 12:30 3.50 WHSUR P DECOMP MAKE UP 9 5/8"SPEAR ASSEMBLY AND ENGAGE 9 5/8"CASING. -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -ENGAGE CASING WITH SPEAR AND UNSEAT CASING -PICK UP TO 225K LBS AND HOLD -SLACK OFF AND THEN PICK UP TO 250K AND HOLD -SLACK OFF AND THEN PICK UP TO 300K AND HOLD -SLACK OFF AND THEN PICK UP TO 350K AND HOLD -SLACK OFF AND RIG UP TO APPLY STEAM TO WELL HEAD -APPLY STEAM TO WELL HEAD AND PICK UP TO250KAND HOLD FOR 1 HOUR. -BEGIN WORKING PIPE IN 25K INCREMENTS AGAIN TO UNSEAT CASING -PICK UP TO 300K LBS AND HOLD -SLACK OFF AND THEN PICK UP TO 325K AND HOLD -SLACK OFF AND THEN PICK UP TO 350K AND HOLD -CASING CAME OFF SEAT AT 350K -172K PICK UP WEIGHT AFTER CASING CAME OFF SEAT. -PICKED UP 10'TO NEXT CASING COLLAR AND REMOVED CASING SLIPS -SET 9 5/8"CASING BACK DOWN ON CUT AND RELEASED SPEAR Printed 11/11/2015 3:38:05PM s • North America-ALASKA-BP Page 15 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 17:00 4.50 WHSUR P DECOMP NIPPLE UP TUBING SPOOL AND BOP STACK -PJSM WITH RIG CREWAND WELL HEAD REPRESENTATIVE -NIPPLE UP TUBING SPOOL AND BOP STACK SIMOPS: -CONTINUE TO INSPECT DERRICK -PAINTING PROJECTS THROUGHOUT THE RIG -TRIAL RUN ON BRINGING UP 14"UHT SUPER TONGS UP BEAVER SLIDE FULLY ASSEMBLED 17:00 - 18:30 1.50 WHSUR P DECOMP PRESSURE TESTING CASING,TUBING SPOOL,AND KILL LINE BREAKS -PRESSURE TEST 250 PSI LOW/1000 PSI HIGH FOR 5 MINUTES EACH -GOOD TEST;TEST MET LEAK TIGHT/ OPERATIONAL ASSURANCE CRITERIA -2.5 BBLS TO PRESSURE UP,BLED BACK 2.3 BBLS 18:30 - 19:30 1.00 WHSUR P DECOMP INSTALLING WEAR RING -PJSM WITH RIG CREW -INSTALLED WEAR RING,ID=12 1/4" 19:30 - 22:30 3.00 CASING P DECOMP SPEAR AND PULL 9 5/8"CASING -PJSM TO SPEAR AND PULL CASING -ENGAGE SPEAR AND PULL 9 5/8"CASING -PU 159K;SO 135K -PULL CASING TO SURFACE -CIRCULATE UNTIL RETURNS CLEAN UP -9 BPM;160 PSI SIMOPS: -MOBILIZE AND ASSEMBLE 14"UHT SUPER TONGS ON RIG FLOOR. -SLB LOADING CEMENT INTO SILOS FOR CEMENT JOB 22:30 - 23:00 0.50 CASING P DECOMP PRE JOB SAFETY MEETING ON LAYING DOWN CASING SPEAR WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -SHUT DOWN PUMPS AND MONITOR WELL FOR 10 MIN;STATIC 23:00 - 00:00 1.00 CASING P DECOMP DISENGAGE AND LAY DOWN CASING SPEAR -SET 9 5/8"CASING IN SLIPS AND DISENGAGE SPEAR -BREAK OUT AND LAY DOWN CASING SPEAR TO PIPE SHED -LAY DOWN CUT JT OF 9 5/8"CASING TO PIPE SHED(8.42'LONG) 10/3/2015 00:00 - 01:00 1.00 CASING P DECOMP RIG UP TO PULL 9 5/8"CASING -PJSM WITH RIG CREW -BLOW DOWN TOP DRIVE -CHANGE ELEVATORS TO 9 5/8"SIDE DOORS -CLEAN AND CLEAR RIG FLOOR OF UNNECESSARY EQUIPMENT 01:00 - 01:30 0.50 CASING P DECOMP INSTALL STRIPING RUBBER AND PULL 9 5/8" CASING -PU 157K -FOUND BOW SPRING CENTRALIZER ON SECOND JOINT OF 9 5/8"CASING. Printed 11/11/2015 3:38:05PM • i North America-ALASKA-BP Page 16 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:OOAM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:30 1.00 CASING P DECOMP INSTALL FOSV ON 9 5/8"CASING AND MONITOR WELL WHILE LOCATING AND MOBILIZING EQUIPMENT NEEDED TO REMOVE BOW SPRING CENTRALIZERS. 02:30 - 04:00 1.50 CASING P DECOMP PULL AND LAY DOWN 9 5/8"CASING WITH BOW SPRING CENTRALIZERS FROM 2183'10 1800'MD -PU 140K -HOLE NOT TAKING PROPER FILL: -FLOW CHECK WELL;STATIC 04:00 - 06:00 2.00 CASING P DECOMP FILL CASING AND CIRCULATE A SURFACE TO SURFACE VOLUME -RIG UP FILL UP LINE FROM TRIP TANK AND FILL CASING -PROPER AMOUNT OF FILL FOR TRIP. -RIG UP HEAD PIN AND CIRCULATE -STAGE UP TO 8 BPM;240 PSI -MONITOR WELL FOR 10 MIN;STATIC 06:00 - 11:30 5.50 CASING P DECOMP CONTINUE TO PULL AND LAY DOWN 9 5/8" CASING FROM 1800'MD TO SURFACE -FILL PIPE EVERY 10 JTS TO VERIFY PROPER FLUID DISPLACEMENT -PIPE RECOVERED: -51 FULL LENGHT JOINTS OF 9 5/8"CASING IN GOOD CONDITION -13 BOWSPRING CENTRALIZERS;MISSING 1 BLADE -TOP CUT JT:8.42' -BOTTOM CUT JT:7.55';OD ON CUT=10"- GOOD CUT. 11:30 - 13:30 2.00 CASING P DECOMP CLEAN AND CLEAR RIG FLOOR AND HANDLING EQUIPMENT. 13:30 - 16:30 3.00 CASING P DECOMP RIG DOWN 14"UHT SUPER TONGS AND LOWER DOWN BEAVER SLIDE -PJSM WITH RIG CREWAND DOYON CASING PRIOR TO BREAKING DOWN TONGS -CONTINUE TO CLEAN RIG FLOOR SIMOPS: -LOADING PIPE SHED WITH 7"CASING 16:30 - 17:30 1.00 WHSUR P DECOMP PULL WEAR RING AND INSTALL TEST PLUG; RUN IN 4 LOCK-DOWNS 17:30 - 19:30 2.00 BOPSUR P OTHCMP FLUSH STACK AND CLEAN OUT RAM CAVITIES -PJSM WITH RIG CREW -FUNCTION RAMS TO CLEAR CAVITIES OF DEBRIS -FLUSH STACK WITH STACK FLUSHING TOOL -10.1 BPM;40 PSI;30 RPM -BLOW DOWN TOP DRIVE -SUCK OUT BOP STACK WHILE FUNCTIONING LOWER RAMS THE BOWSPRING CENTRALIZER BLADE WAS SIGHTED IN THE LOWER RAM CAVITY. CONTINUE WITH RAM CHANGE OPERATIONS AND MOBILIZE A MAGNET FROM BAKER FISHING TO RECOVER BOWSPRING CENTRALIZER BLADE. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 17 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To C Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 22:00 2.50 BOPSUR P OTHCMP CHANGE UPPER PIPE RAMS FROM 9 5/8" CASING RAMS TO 7"CASING RAMS -BARRIERS:BLIND/SHEAR RAMS;STABLE KILL WEIGHT FLUID COLUMN -PJSM WITH RIG CREW -CHANGE UPPER PIPE RAMS AND CLEAN OUT RAM CAVITIES; -SMALL AMOUNT OF OLD CEMENT AND DEBRIS STILL IN RAM CAVITIES AFTER CLOSING UPPER RAM DOORS,6" MAGNET WAS USED TO RECOVER THE BOWSPRING CENTRALIZER BLADE. SIMOPS: -CHANGE OUT LIGHTS IN DERRICK -PAINTING CATTLE CHUTE 22:00 - 00:00 2.00 BOPSUR P OTHCMP CEMENT AND DEBRIS OBSERVED ON TOP OF TEST PLUG.CLEAN OUT WELL BORE AND TOP OF TEST PLUG OF OLD CEMENT AND DEBRIS UTILIZING RIG VACUUM SYSTEM AND WATER. 10/4/2015 00:00 - 02:00 2.00 BOPSUR P OTHCMP RIG UP TO TEST BOPE PJSM WITH RIG CREW;REVIEW DDI PROCEDURE FOR TESTING BOPE -RIG UP TEST EQUIPMENT -FILL STACK AND ATTEMPT TO GETA SHELL TEST -WSL REVIEWED PRESSURE CROSSCHECK CHECKLIST WITH DRILLER -FLUID LEAKING BY TEST PLUG -CALL OUT CAMERON WELLHEAD REPRESENTATIVE TO BRING NEW TEST PLUG SEAL 02:00 - 04:30 2.50 WHSUR N WAIT OTHCMP PULL TEST PLUG AND FLUSH OUT WELLHEAD -PJSM WITH RIG CREW -BACK OUT LOCK DOWNS AND PULL TEST PLUG -TEST PLUG SEAL DAMAGED -FLUSH OUT STACK AND CHECK EQUIPMENT WHILE WAITING FOR NEW SEAL. -REPLACE SEAL ON TEST PLUG AND RE-INSTALL TEST PLUG Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 18 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) • Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 04:30 - 12:30 8.00 BOPSUR P OTHCMP STATE GIVEN NOTIFICATION OF BOPE TEST 10/02/2015 12:47. STATE INSPECTOR CHUCK SCHEVE WAIVE WITNESS. PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#195-087,AND BP PRACTICE 100218. -TEST ALL BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN. -TEST BLOWOUT PREVENTERS AND ALL ASSOCIATED BOPE. -LOWER 3-1/2"X 6"VBR'S TESTED WITH 4" TEST JOINT. -UPPER 7"FBR'S TESTED WITH 7"TEST JOINT. -ANNULAR TESTED WITH 4"TEST JOINT. -BLIND/SHEAR RAMS TESTED. -TEST CHOKE MANIFOLD VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES. -TEST MANUAL AND HYDRAULIC IBOP'S ON TOP DRIVE. -TEST FOSVS AND DART VALVE. -PERFORM DRAW DOWN TEST OF ACCUMULATOR. -FUNCTION BOPE FROM REMOTE PANEL AND MAIN UNIT. -TEST GAS ALARMS. -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST PRIOR TO SHELL TEST. -FAIL-PASS ON CHOKE LINE OTECO FLANGE. 12:30 - 13:30 1.00 BOPSUR P OTHCMP PJSM AND RIG DOWN FROM BOPE TEST. -RIG DOWN TEST EQUIPMENT,CLEAR FLOOR. -BLOW DOWN CHOKE/KILL/BLEEDER LINES. 13:30 - 18:00 4.50 TIEBAC P OTHCMP PJSM AND RIG UP TO RUN 7"26#L-80 VAM TOP TIE-BACK. -RIG UP POWER TONGS. -MU X-OVER TO FLOOR VALVE AND LIFTING SUB ON SAFETY JOINT. Printed 11/11/2015 3:38:05PM North America-ALASKA-BP Page 19 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 TIEBAC P OTHCMP PJSM AND RUN 7",26#,L-80,VAM TOP TIE-BACK TO 2,528'MD. -MAKE UP SEAL ASSEMBLY AND PORTED FLOAT COLLAR JOINT. -CHECK FLOAT COLLAR ON SURFACE, HOLDING. -USE JET LUBE SEAL GUARD THREAD COMPOUND. -TORQUE CONNECTIONS TO 11,950 FT-LBS. -RUN 1 LOCKED DOWN CENTRALIZER ON FLOAT COLLAR JOINT. -RUN IN HOLE AT 60 FT/MIN FROM SURFACE TO 2,405'MD. -FILL CASING EVERY 5 JOINTS -OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS. -PU 100K,SO 100KAT 2,198'MD. -BRINE WEIGHT:9.8 PPG IN,9.8 PPG OUT. -LOSSES WHILE RIH:0 BBLS. -DID NOT TAKE WEIGHT WITH SEAL ASSEMBLY THRU CASING STUB AT 2,234'MD. -TOOK 18K#DOWN WITH FLOAT COLLAR AT CASING STUB. -TOOK 8K#WITH CENTRALIZER AT CASING STUB. ***HOLD KICK WHILE TRIPPING DRILL WITH AAR.*** 10/5/2015 00:00 - 09:00 9.00 TIEBAC P OTHCMP PJSM AND RUN 7",26#,L-80,VAM TOP TIE-BACK;FROM 2528'-7885'MD. -USE JET LUBE SEAL GUARD THREAD COMPOUND. -TORQUE CONNECTIONS TO 11,950 FT-LBS. -RUN IN HOLE AT 60 FT/MIN. -FILL CASING EVERY 5 JOINTS -OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS -PU 100K;SO 100K AT 2198'MD -PU 185K;SO 150K AT 5820'MD -PU 245K;SO 170KAT 7885'MD -BRINE WEIGHT:9.8 PPG IN,9.8 PPG OUT -LOSSES WHILE RIH:0 BBLS ***HOLD KICK WHILE TRIPPING DRILL WITH AAR.*** 09:00 - 09:30 0.50 TIEBAC P OTHCMP CHANGE OUT ELEVATORS FROM 7"TO 9 5/8"; -PICK UP XO AND JOINT 191 AND MAKE UP TO STRING 09:30 - 11:30 2.00 TIEBAC P OTHCMP RIG DOWN T'DOUBLE STACK TONGS AND RIG UP 9 5/8"CASING TONGS -PJSM WITH RIG CREW AND DOYON CASING -RIG DOWN DOUBLE STACK TONGS -CLEAR RIG FLOOR OF 7"HANDLING TOOLS -MOBILIZE 9 5/8"CASING TONGS TO RIG FLOOR -RIG UP 9 5/8"CASING TONGS AND HANDLING EQUIPMENT Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 20 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UVM:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 14:30 3.00 TIEBAC P OTHCMP PICKAND MAKE UP 9 5/8"CASING PUPS AND 9 5/8"CASING JOINTS TO LAND 7"TIE-BACK -PJSM WITH RIG CREW -PICKED UP AND MADE UP(2)9 5/8"CASING SPACE OUT PUPS W/XO FOR HEAD PIN -LAY DOWN CIRCULATING ASSEMBLY -PICK AND RUN IN THE HOLE SINGLE JOINT OF 9 5/8",47#CASING. -PICK UP SPACE OUT/CIRCULATING ASSEMBLY AND MAKE UP ONTO STRING. -PU 240K;SO 173K. -RIG UP CEMENT LINE AND ESTABLISH CIRCULATION -2 BPM;50 PSI -RUN IN THE HOLE AND OBSERVE PRESSURE INCREASE TO 100 PSI AS SEAL ASSEMBLY ENTERED TIE-BACK SLEEVE. -MARKED PIPE,BLED OFF PRESSURE AND CONTINUED TO RUN IN THE HOLE TO NO-GO AT 7981'MD -SET DOWN 15K AND MARK PIPE. 14:30 - 16:00 1.50 TIEBAC P OTHCMP PICK UP HES QUICK LATCH CEMENT HEAD -PJSM WITH RIG CREWAND HES REPRESENTATIVE -WSL AND BP NS FIELD SUPERINTENDENT VERIFIED LOADING OF HES HWE 7"x 9 5/8" COMBINATION PLUG -BREAK OFF CEMENT LINES AND RIG DOWN HEAD PIN -PICK UP CEMENT HEAD AND MAKE UP TO 9 5/8"CASING STRING. -ATTEMPT TO LATCH UP ELEVATORS: 16:00 - 17:00 1.00 TIEBAC N WAIT OTHCMP CALL OUT AND WAIT FOR 6'BAIL EXTENSIONS TO LATCH UP ELEVATORS WITH HES QUICK LATCH CEMENT HEAD INSTALLED -WHEN ATTEMPTING TO LATCH UP ELEVATORS VVITH JUST 4'EXTENSIONS THE 1502 AND LIFT CAP ON TOP OF THE CEMENT HEAD HITS THE BELL GUIDE ON THE TOP DRIVE. -WAIT FOR 6'BAIL EXTENSIONS TO ARRIVE ON LOCATION. -MOBILIZE 6'EXTENSIONS TO RIG FLOOR -MAKE UP 6'EXTENSIONS TO EXISTING 4' EXTENSIONS AND NORMAL BAILS. -MAKE UP ELEVATORS AND LATCH UP TO 9 • 5/8"CASING. _ 17:00 - 17:30 0.50 TIEBAC P OTHCMP PICK UP TO EXPOSE PORTS AND ESTABLISH CIRCULATION -PICK UP 3'TO EXPOSE PORTS BETWEEN SEALS ON TIW SEAL ASSEMBLY • -STAGE UP PUMPS AND ESTABLISH CIRCULATION -2 BPM;50 PSI -3 BPM;100 PSI -4 BPM;130 PSI -5 BPM;200 PSI Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 21 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:00 0.50 TIEBAC P OTHCMP PRESSURE TEST SLB CEMENT LINES 250/ 4000 PSI -PJSM WITH RIG CREWAND SLB CEMENTORS -PRESSURE TEST CEMENT LINES 250 PSI LOW/4000 PSI HIGH;GOOD TEST 18:00 - 19:00 1.00 TIEBAC P OTHCMP SCHLUMBERGER CEMENTING CREW CHANGE-PJSM WITH ONCOMING CREW AND RIG CREW TO PUMP 7"TIE-BACK CEMENT JOB. -BEGIN BATCHING UP CEMENT AT 18:48 19:00 - 21:30 2.50 TIEBAC P OTHCMP CEMENT 7"TIE-BACK -PUMP 430 BBLS OF 15.8 PPG CLASS G CEMENT @ 6 BPM,EXCESS VOLUME 50 BBLS (YIELD 1.17 CU.FT/SK) -ICP 190 PSI;FCP 200 PSI -DROP HES NEWT x 9 5/8"COMBINATION PLUG;POSITIVE INDICATION OF PLUG DROP -CLOSE ANNULAR AND OPEN UP OA TO TAKE RETURNS TO FLOWBACK TANK -SLB PUMP 10 BBLS WATER TO FLUSH LINES -5 BPM;200 PSI -AT 3 BBLS AWAY PLUG ENTERED 7" SWAP TO RIG PUMPS TO DISPLACE CEMENT WITH 9.8 PPG BRINE -7 BPM;190 PSI FOR 33 BBLS TO CATCH CEMENT -REDUCE RATE TO 5 BPM FOR 287 BBLS(297 BBLS TOTAL DISPLACEMENT) -ICP 660 PSI;FCP 2840 PSI -OBSERVE CEMENT RETURNS AT THE FLOW BACK TANK AT 242 BBLS AWAY -REDUCE RATE TO 2 BPM TO BUMP PLUG AT 297.5 BBLS(307.5 BBLS TOTAL DISPLACEMENT) -0.7 BBLS OVER CALCULATED DISPLACEMENT -INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 1 MIN. -VERIFY ZERO PRESSURE ON ANNULUS AND OPEN ANNULAR -SLACK OFF TO NO-GO AND ENGAGE SEALS -BLEED OFF PRESSURE AND CHECK FLOATS FOR 10 MIN;FLOATS HOLDING. -CEMENT IN PLACE AT 21:23 HRS;PUMPED 2648 SKS OF CEMENT -NO LOSSES DURING JOB,50 BBLS OF CEMENT BACK TO SURFACE. 21:30 - 22:00 0.50 TIEBAC P OTHCMP CLOSE ANNULAR AND FLUSH STACK AND LINES TO FLOW BACK TANK WITH 20 BBL BLACK WATER PILL -4 BPM;90 PSI. 22:00 - 23:00 1.00 TIEBAC P OTHCMP RIG DOWN AND BLOW DOWN LINES -PJSM WITH RIG CREW -BLOW DOWN CHOKE,KILL AND BLEEDER LINES -BLOW DOWN LINES TO SCHLUMBERGER -BLOW DOWN LINE TO FLOW BACK TANK AND FREEZE PROTECT Printed 11/11/2015 3:38:05PM i • North America-ALASKA-BP Page 22 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'(g55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 WHSUR P OTHCMP SPLIT STACK FOR WELLHEAD WORK -PJSM WITH RIG CREWAND WELL HEAD REPRESENTATIVE -SPLIT BOP STACK AND PICK UP TO INSTALL EMERGENCY SLIPS. 10/6/2015 00:00 - 01:30 1.50 WHSUR P OTHCMP CONTINUE TO SPLIT STACKAND PICKUP TUBING SPOOL FOR WELLHEAD WORK -PJSM WITH RIG CREWAND WELL HEAD REPRESENTATIVE -SPLIT BOP STACK AND PICK UP TUBING SPOOL TO INSTALL EMERGENCY SLIPS. -CENTER CASING IN WELL HEAD 01:30 - 03:30 2.00 WHSUR P OTHCMP INSTALL 9 5/8"EMERGENCY SLIPS -PJSM WITH RIG CREWAND WELL HEAD REPRESENTATIVES -PU 50K TO KEEP CASING STRING IN TENSION -INSTALL EMERGENCY SLIPS -SLACK OFF AND SET SLIPS 03:30 - 05:00 1.50 WHSUR P OTHCMP RIG DOWN CEMENT HEAD AND SUCK OUT 9 5/8"CASING TO PREP FOR WACHS CUT -PJSM WITH RIG CREWAND WELL HEAD REPRESENTATIVES -UNLATCH AND LAY DOWN HES QUICK LATCH CEMENT HEAD. -SUCK OUT 9.8 PPG BRINE IN 9 5/8"CASING TO WELLHEAD LEVEL. -LATCH UP ELEVATORS TO 9 5/8"CASING AND PU 5K AND HOLD FOR WACHS CUT -SET UP WACHS CUTTER IN CELLAR -CUT 9 5/8",47#CASING WITH WACHS CUTTER. 05:00 - 05:30 0.50 WHSUR P OTHCMP PULL AND LAY DOWN THE CUT JOINT OF 9 5/8 CASING -LENGTH OF CUT JT 26.52' 05:30 - 06:30 1.00 WHSUR P OTHCMP NIPPLE DOWN OLD TUBING SPOOL FROM BOTTOM OF BOP STACK -PJSM WITH RIG CREWAND WELL HEAD REPRESENTATIVES -RACK BACK THE BOP STACK ON TO STUMP AND SECURE -NIPPLE DOWN OLD TUBING SPOOL AND REMOVE FROM CELLAR 06:30 - 07:30 1.00 WHSUR P OTHCMP NIPPLE UP NEW TUBING SPOOL ON WELL HEAD -PJSM WITH RIG CREWAND WELL HEAD REPRESENTATIVES -NIPPLE UP TUBING SPOOL AND INSTALL SECONDARY INNER ANNULUS VALVE 07:30 - 08:30 1.00 WHSUR P OTHCMP ENERGIZE PACK OFF WITH THE PLASTIC PACK AS PER CAMERON SOP Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 23 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'i55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 10:90 2.00 WHSUR P OTHCMP PRESSURE TEST THE PACK OFF;250/3500 PSI -250 PSI ON LOW FOR 5 MINUTES;GOOD TEST -3500 PSI HIGH FOR 30 MINUTES: -LOST 73 PSI OVER FIRST 15 MIN;13 PSI OVER THE SECOND 15 MIN -GOOD TEST RIG CREW PERFORMED A MAN DRILL IN THE PIPE SHED WHILE PRESSURE TEST WAS ONGOING IN THE CELLAR. 10:30 - 12:00 1.50 BOPSUR P OTHCMP NIPPLE UP BOP STACK -PJSM WITH RIG CREW -SET BOP STACK ON TUBING SPOOL AND TORQUE UP 12:00 - 15:00 3.00 BOPSUR P OTHCMP CHANGE UPPER PIPE RAMS FROM 7"CASING RAMS TO 2 7/8"x 5"VBRS -PJSM WITH RIG CREW -OPEN DOORS,CLAN OUT CAVITIES AND CHANGE UPPER PIPE RAMS SIMOPS: -INSPECT TOP DRIVE SAVER SUB 15:00 - 18:00 3.00 BOPSUR P OTHCMP PRESSURE TEST RAMS -PJSM WITH RIG CREW -RIG UP TEST EQUIPMENT AND SET TEST PLUG -TEST UPPER AND LOWER RAMS WITH 4 1/2" TEST JOINT; -250/3500 PSI FOR 5 CHARTED MIN EACH; GOOD TEST -LAY DOWN 4 1/2"TEST JOINT AND PICK UP 2 7/8"TEST JOINT -ATTEMPT TO PRESSURE TEST ANNULAR PREVENTER WITH 2 7/8"TEST JOINT -250 PSI LOW FOR 5 CHARTED MIN;GOOD TEST -3500 PSI HIGH FOR 5 CHARTED MIN;FLUID LEAKING BY ANNULAR PREVENTER -BLEED OFF PRESSURE,INCREASE ANNULAR CLOSING PRESSURE AND ATTEMPT TO TEST AGAIN -FLUID STILL LEAKING BY ANNULAR •BLEED OFF PRESSURE,LAY DOWN TEST JOINT AND BLOW DOWN ALL LINES 18:00 - 00:00 6.00 BOPSUR N RREP OTHCMP CHANGE OUT ANNULAR ELEMENT -PJSM WITH RIG CREW -NIPPLE DOWN UPPER RISER AND DUTCH RISER FLANGE -REMOVE ANNULAR CAP;AND PULL DAMAGED ELEMENT -INSTALL NEW ELEMENT AND CAP SEAL 10/7/2015 00:00 - 03:00 3.00 BOPSUR N RREP OTHCMP CONTINUE CHANGING OUTANNULAR ELEMENT -REPLACE SEALS ON ANNULAR CAP -REINSTALL ANNULAR CAP -REINSTALL DUTCH RISER FLANGE -REINSTALL BELL NIPPLE AND RISER -AIR UP AIR BOOTS AND PICK UP 2 7/8"TEST JOINT Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 24 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 05:00 2.00 BOPSUR P OTHCMP PRESSURE TEST ANNULAR AND UPPER PIPE RAMS WITH 2 7/8"TEST JOINT -FILL STACK AND PURGE AIR FROM LINES -WORK ANNULAR ELEMENT SEVERAL TIMES -PRESSURE TEST ANNULAR WITH 2 7/8" TEST JOINT 250/3500 PSI;GOOD TEST -PRESSURE TEST UPPER PIPE RAMS WITH 2 7/8"TEST JOINT 250/3500 PSI -FLUID LEAKING BY UPPER PIPE RAMS -BEGIN TROUBLESHOOTING LEAKING UPPER PIPE RAMS. 05:00 - 08:00 3.00 BOPSUR N RREP OTHCMP REMOVE AND RE-DRESS UPPER PIPE RAMS; 27/8"x5"VBR -PJSM WITH RIG CREW -OPEN UPPER RAM DOORS AND REMOVE VBR BODIES FROM STACK -RE-DRESS RAM BODIES WITH NEW SEALS AND ELEMENTS -RE-INSTALL RAM BODIES IN STACK AND CLOSE DOORS 08:00 - 09:00 1.00 BOPSUR N RREP OTHCMP ATTEMPT TO RE-TEST UPPER PIPE RAMS WITH 2 7/8"TEST JOINT 250/3500 PSI FOR 5/5 MIN -PICK UP AND INSTALL 2 7/8"TEST JOINT FILL STACK AND PURGE AIR FROM LINES -ATTEMPT TO PRESSURE TEST UPPER PIPE RAMS -FLUID CONTINUES TO LEAK BY UPPER PIPE RAMS -PULL AND LAY DOWN TEST JOINT. 09:00 - 13:00 4.00 BOPSUR N RREP OTHCMP REMOVE RAM BODIES AND RE-DRESS A DIFFERENT SET OF RAM BODIES WITH NEW ELEMENTS AND SEALS;2 7/8"x 5"VBR -PJSM WITH RIG CREW -OPEN UPPER RAM DOORS AND REMOVE VBR BODIES FROM STACK -RE-DRESS DIFFERENT RAM BODIES WITH NEW SEALS AND ELEMENTS -INSTALL RAM BODIES IN STACK AND CLOSE DOORS -RE-INSTALL 2 7/8"TEST JOINT AND BREAK IN UPPER RAMS PER HYDRIL RECOMMENDATIONS 13:00 - 15:00 2.00 BOPSUR N RREP OTHCMP PRESSURE TEST UPPER PIPE RAMS WITH 2 7/8"AND 4 1/2"TEST JOINTS;250/2500 PSI FOR 5/5 CHARTED MIN. -PRESSURE TEST UPPER RAMS WITH 2 7/8" TEST JOINT;250/3500 PSI -GOOD TEST -PRESSURE TEST UPPER PIPE RAMS WITH 4 1/2"TEST JOINT;250/3500 PSI -GOOD TEST -LAY DOWN TEST JOINT 15:00 - 15:30 0.50 WHSUR P OTHCMP PULL TEST PLUG AND INSTALL WEAR RING -PJSM WITH RIG CREW -INSTALL 12 1/4"ID WEAR RING. Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 25 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 17:00 1.50 TIEBAC P OTHCMP PRESSURE TEST 7"x 9 5/8"TIE-BACK; 250/3500 PSI FOR 5/30 CHARTED MIN -PJSM WITH RIG CREW -PURGE LINES OF AIR AND CLOSE BLIND/SHEAR RAMS -PRESSURE TEST 250 PSI LOW;GOOD TEST -PRESSURE UP TO 3700 PSI AND HOLD FOR 30 MIN. -PRESSURE DECREASED 30 PSI OVER FIRST 15 MIN -PRESSURE DECREASED 5 PSI OVER SECOND 15 MIN -HIGH PRESSURE TEST MET INTEGRITY TEST CRITERIA -NOTIFIED ODE AND WTL;TEST CHART AND TEST CRITERIA CALCULATOR ATTACHED 17:00 - 18:30 1.50 CLEAN P OTHCMP MOBILIZE 6"CLEAN OUT ASSEMBLY TO RIG FLOOR -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -MOBILIZE BHA COMPONENTS TO RIG FLOOR SWOPS: -BLOW DOWN ALL LINES AND RIG DOWN TEST EQUIPMENT 18:30 - 19:30 1.00 CLEAN P OTHCMP PICK UP AND RUN IN THE HOLE WITH 6" CLEAN OUT ASSY -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -PICK UP AND MAKE UP CLEAN OUT BHA: -6"MILLTOOTH BIT;NOV SER#:D207410 -(3)4 3/4"BOOT BASKETS -BIT SUB -6"OD STRING MILL -4 3/4"BUMMPER SUB AND OIL JARS -PUMP OUT SUB -XO -(6)4 3/4"DRILL COLLARS -OAL=227.48' 19:30 - 22:00 2.50 CLEAN P OTHCMP RUN IN THE HOLE WITH 6"CLEAN OUT ASSY, PICKING UP DRILL PIPE FROM PIPE SHED -FROM 227'MD TO 3076'MD -PICK UP 90 SINGLES FROM PIPE SHED 22:00 - 22:30 0.50 CLEAN P OTHCMP RUN IN THE HOLE WITH 6"CLEAN OUT ASSY ON STANDS OUT OF THE DERRICK -FROM 3076'MD TO 3456'MD Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 26 of 69 Operation SummaryReport p p Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:OOAM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.3ousft(above Mean Sea Leval) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:00 0.50 CLEAN P OTHCMP D1,KICK WHILE TRIPPING DRILL WITH ESCALATING FAILURES AND AAR: -INDUCED FLOW FROM OFFLINE PILL PIT THROUGH THE IA TO SIMULATE A KICK WHILE TRIPPING. -PIT SENSOR ON PILL PIT WAS DISABLED EARLIER IN DAY IN PREPARATION FOR DRILL -PITWATCHER HAD NOTICED EARLIER IN DAY,WAS INFORMED OF NEED FOR REPAIRS AND WAS MANUALLY STRAPPING PILL PIT. -DRILLER OBSERVED INCREASE FLOWAND CHECKED WITH PITWATCHER. -DRILLER THEN SPACED OUT AND FLOW CHECKED THE WELL. DRILLER OBSERVED THE FLOWAND CALLED A DRILL. -FLOOR HANDS INSTALLED THE FOSV AND CLOSED IT. -FAILURE#1:DRILLER ATTEMPTED TO CLOSE THE ANNULAR PER THE STANDING ORDERS USING THE REMOTE STATION -WSL AND TOOLPUSHER HAD SHUT-IN THE HYDRAULICS TO THE KOOMEY PANEL PRIOR TO THE DRILL TO SIMULATE A FAILURE -MOTORMAN INFORMED THE DRILLER THAT THE ANNULAR HAD NOT RESPONDED TO THE SIGNAL FROM THE REMOTE PANEL. -WHEN THE ANNULAR DID NOT RESPOND, THE DRILLER HAD THE MOTORMAN CLOSE THE ANNULAR MANUALLY AND OPEN THE CHOKE HCR. -FAILURE#2:FLOORHAND FOUND SIGN (PLACED BY WSL PRIOR TO DRILL)ON SUPER CHOKE SAYING IT WAS OUT OF SERVICE. -DRILLER HELPED FLOORHAND RE-LINE UP CHOKE MANIFOLD TO UTILIZE THE MANUAL CHOKE -FLOORHAND STARTED RECORDING PRESSURES(CHARGE PUMP- 40 PSI ON ANNULUS) -TOTAL ELAPSED TIME FROM INDUCING FLOW TO ANNULAR SHUT AND WELL SECURE-5 MIN -TOTAL PIT GAIN FROM INDUCED FLOW TO TRIP TANK-3.5 BBLS AAR HELD AFTER DRILL TO DISCUSSES ACTIONS OF PERSONNEL DURING DRILL AND KEY LEARNINGS. -ALL PERSONNEL RESPONDED APPROPRIATELY TO DRILL AND FAILURES -SOME CONFUSION WHEN THINGS WEREN'T LINED UPAS CREW HAD EXPECTED; -DRILLER WAS CALM AND DIRECTED HIS CREW APPROPRIATELY TO DEAL WITH ISSUES. -MOTORMAN WAS UNAWARE OF THE VALVE THAT SHUT OFF THE HYDRAULICS TO THE KOOMEY CONTROL PANEL. -TOOLPUSHER WALKED MOTORMAN THROUGH THE SYSTEM Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 27 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) -FLOORHAND IN CELLAR DISCUSSED LINE-UP THAT HE FOUND IN CELLAR AFTER WELL WAS SECURE -DRILLER AND WSL DISCUSSED WITH CREW CHOKE MANIFOLD LINE-UP THROUGH MANUAL CHOKE -BRIEFLY REVIEWED RECENT INCIDENT IN MILNE POINT INVOLVING MISALIGNED VALVE ON GAS BUSTER 23:00 - 23:30 0.50 CLEAN P OTHCMP RIG DOWN AND BLOW DOWN LINES FROM D1 DRILL: -PJSM WITH RIG CREW -BLOW DOWN CHOKE LINE AND INJECTION LINE -RIG DOWN INJECTION LINE IN CELLAR -RE-ENABLE SENSOR ON PILL PIT -LINE UP CHOKE MANIFOLD FOR NORMAL OPERATIONS -OPEN HYDRAULIC LINE TO KOOMEY CONTROL PANEL AND VERIFY FUNCTION. 23:30 - 00:00 0.50 CLEAN P OTHCMP CONTINUE TO RUN IN THE HOLE WITH 6" CLEAN OUT ASSY ON DRILL PIPE STANDS OUT OF THE DERRICK -FROM 3456'MD TO 4310'MD -PU 110K;SO 100K 10/8/2015 00:00 - 02:00 2.00 CLEAN P OTHCMP CONTINUE TO RUN IN THE HOLE WITH 6" CLEAN OUT ASSY ON DRILL PIPE STANDS OUT OF THE DERRICK -FROM 4310'MD TO 7824'MD -PU 190K;SO 125K SPR AT 7824'MD: -MW 9.8 PPG IN/OUT -MP#1:20/30 SPM;40/200 PSI -MP#2:20/30 SPM;60/200 PSI Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 28 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'©55.30usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 07:00 5.00 CLEAN P OTHCMP CLEAN OUT TIE-BACK,DRILL UP PLUG AND FLOAT COLLAR AND CLEAN OUT TO TOP OF SAND -OBTAIN PARAMETERS: -PU 190K;SO 125K,ROT 150K -60 RPM,7K FT-LBS TORQUE;100 RPM, 7.5K FT-LBS TORQUE -850 PSI AT 6 BPM;1150 PSI AT 7 BPM -WASH DOWN AT 3 BPM,200 PSI AND TAG CEMENT AT 7860'MD -DRILL CEMENT FROM 7860'MD TO TOP OF PLUG AT 7952'MD -60 RPM;7K TORQUE;5K WOB -830 PSI AT 6 BPM;INCREASE FLOW RATE TO 7 BPM AND 1170 PSI -DRILL PLUG,FLOAT AND SHOE TRACK FROM 7952'MD TO 7960'MD -INCREASE ROTARY TO 100 RPM;7-9K FT-LBS TORQUE -1170 PSI AT 7 BPM -CIRCULATE 20 BBL HIGH VIS SWEEP AT 7960'MD -MODERATE INCREASE IN CEMENT WITH PIECES OF RUBBER OBSERVED AT SURFACE. -CONTINUE TO CLEAN OUT CEMENT IN TIE-BACK SHOE TO 7980'MD -DRILL CEMENT FROM BOTTOM OF TIE-BACK SHOE TO TOP OF SAND AT 8000'MD -70 RPM;7K FT-LBS TORQUE;8-10K WOB; 900 PSI AT 6 BPM -DRILL 5'INTO SAND TO 8005'MD AND CIRCULATE A BOTTOMS UP -2020 PSI AT 9 BPM,SAND AND CEMENT IN RETURNS -DRY DRILL ON SAND AT 8005'MD FOR 30 MIN -60 RPM;7K FT-LBS TORQUE;3-5K WOB -PU 192K;SO 130K 07:00 - 08:00 1.00 CLEAN P OTHCMP PUMP 30 BBL HIGH-VIS SWEEP AT 8005'MD -2533 PSI AT 12 BPM -RECOVERED A SIGNIFICANT AMOUNT OF SAND AND CEMENT 08:00 - 08:30 0.50 CLEAN P OTHCMP TAKE SLOW PUMP RATES,BLOW DOWN TOP DRIVE AND MONITOR WELL FOR TRIP OUT OF THE HOLE SPR AT 8005'MD: -MW 9.8 PPG IN/OUT -MP#1:30/40 SPM;230/430 PSI -MP#2:30/40 SPM;220/420 PSI -BLOW DOWN TOP DRIVE -MONITOR THE WELL FOR 10 MIN:STATIC 08:30 - 11:30 3.00 CLEAN P OTHCMP PJSM AND SLIP AND CUT DRILL LINE. -HANG BLOCKS.SLIP AND CUT 540'OF DRILL LINE. -INSPECT DRAWWORKS BRAKE LINKAGE. -INSPECT SAVER SUB.CALIBRATE BLOCK HEIGHT.TEST CROWN-O-MATIC. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 29 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 12:00 0.50 CLEAN P OTHCMP PULL OUT OF THE HOLE WITH 6"CLEAN OUT ASSY;FROM 7918'MD TO 7824'MD -PU 190K;SO 130K 12:00 - 12:30 0.50 CLEAN P OTHCMP SERVICE TOP DRIVE,BLOCKS AND DRAWWORKS 12:30 - 15:00 2.50 CLEAN P OTHCMP CONTINUE TO PULL OUT OF THE HOLE WITH 6"CLEAN OUT ASSY;FROM 7824'MD TO 322' MD -STAND BACK DRILL PIPE IN DERRICK -MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING BHA;WELL STATIC. 15:00 - 16:30 1.50 CLEAN P OTHCMP PULL AND LAY DOWN 6"CLEAN OUT ASSY. -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -STAND BACK(2)STANDS OR 4 3/4"DRILL COLLARS IN DERRICK -CLEAN AND LAY DOWN BOOT BASKETS -LAY DOWN STRING MILL -RECOVERED 9"OF BOW SPRING CENTRALIZER BLADE PIECES IN JUNK BASKETS -MOBILIZE RCJB TO RIG FLOOR 16:30 - 18:00 1.50 CLEAN P OTHCMP MAKE UP AND RUN IN THE HOLE WITH BHA #7,RCJB ASSY,TO 230'MD -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -MAKE UP RCJB,PIN x PIN XO,(2)BOOT BASKETS,7"CASING SCRAPER,BIT SUB, BUMPER SUB,JARS,XO,(6)4 3/4"DRILL COLLARS -OAL=230.04' 18:00 - 21:00 3.00 CLEAN P OTHCMP RUN IN THE HOLE WITH BHA#7,RCJB ASSY, FROM 230'MD TO 7920'MD -PJSM WITH RIG CREW -RUN IN THE HOLE ON DRILL PIPE STANDS FROM DERRICK 21:00 - 22:00 1.00 CLEAN P OTHCMP CIRCULATE SAND AND JUNK,WITH RCJB -OBTAIN PARAMETERS: -PU 191K;SO 176K;ROT 150K;690 PSI AT 4.5 BPM;40 RPM;6-7K FT-LBS TORQUE -DROP 7/8"RCJB ACTIVATION BALL -RUN IN THE HOLE AND TAG SAND AT 8011' MD WITH 10K WOB -CIRCULATE AND WASH SAND AND JUNK FROM 8011'MD TO 8026'MD -2060 PSI AT 7.6 BPM -MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM;STATIC -PICK UP FROM 8026'MD TO 7920'MD AND BLOW DOWN TOP DRIVE. 22:00 - 00:00 2.00 CLEAN P OTHCMP PULL OUT OF THE HOLE WITH BHA#7,RCJB ASSY,FROM 7920'MD TO 2414'MD PU 100K,SO 100K 10/9/2015 00:00 - 00:30 0.50 CLEAN P OTHCMP CONTINUE TO PULL OUT OF THE HOLE WITH BHA#7,RCJB ASSY,FROM 2414'MD TO 325' MD Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 30 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 02:30 2.00 CLEAN P OTHCMP PULL BHA#7,RCBJ ASSY AND CLEAN FOR SECOND TRIP -MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA;STATIC -STAND BACK 4 3/4"DRILL COLLARS IN DERRICK -PULL RCJB ASSY OUT OF THE HOLE. -CLOSE BLIND/SHEAR RAMS -BREAK AND EMPTY RCJB;RECOVERED SOME METAL AND RUBBER FROM RCJB -BREAK AND EMPTY BOOT BASKETS; RECOVERED SOME CEMENT AND METAL DEBRIS FROM BOOT BASKETS. -BREAK OUT TOP SUB ON RCJB AND VERIFY BALL ON SEAT. 02:30 - 03:00 0.50 CLEAN P OTHCMP RUN IN THE HOLE WITH BHA#8,RCJB ASSY (RE-RUN OF BHA#7)TO 230'MD -PJSM WITH RIG CREW -OPEN BLIND/SHEAR RAMS 03:00 - 06:00 3.00 CLEAN P OTHCMP RUN IN THE HOLE WITH BHA#8,RCJB ASSY, FROM 230'MD TO 7921'MD -PJSM WITH RIG CREW -RUN IN THE HOLE ON DRILL PIPE STANDS FROM DERRICK -PU 190K;SO 130K SIMOPS: -LOAD PIPE SHED WITH 4 1/2"TUBING 06:00 - 08:00 2.00 CLEAN P OTHCMP CIRCULATE OUT SAND AND JUNK,WITH RCJB -OBTAIN PARAMETERS: -PU 193K;SO 130K;ROT 150K;2020 PSI AT 7.5 BPM;30 RPM;7K FT-LBS TORQUE -RUN IN THE HOLE AND TAG SAND AT 8011' MD WITH 5K WOB -CIRCULATE AND WASH SAND AND JUNK FROM 8011'MD TO 8044'MD -CIRCULATE 32 BBL HIGH-VIS SWEEP AT 8044'MD -2240 PSI AT 8 BPM -RECOVERED SAND,RUBBER CHUNKS AND ALUMINUM SHAVINGS ACROSS SHAKERS -MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM;STATIC -PICK UP FROM 8044'MD TO 7921'MD AND BLOW DOWN TOP DRIVE. -PU 190K;SO 130K 08:00 - 11:00 3.00 CLEAN P OTHCMP PULL OUT OF THE HOLE WITH BHA#8,RCJB ASSY,FROM 7921'MD TO 260'MD -PU 64K,SO 64K Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 31 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 CLEAN P OTHCMP PULL AND LAY DOWN BHA#8,RCJB ASSY FROM 260'MD -MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA;STATIC -STAND BACK 4 3/4"DRILL COLLARS IN DERRICK -PULL RCJB ASSY OUT OF THE HOLE. CLOSE BLIND/SHEAR RAMS -BREAK,EMPTY AND LAY DOWN RCJB AND BOOT BASKETS -RECOVERED(4)1"LONG PIECES OF BOW SPRING CENTRALIZER BLADES 12:00 - 13:00 1.00 CLEAN P OTHCMP CLEARED RIG FLOOR OF FISHING TOOLS; MOBILIZE RBP RETRIEVAL TOOL TO RIG FLOOR 13:00 - 14:00 1.00 CLEAN P OTHCMP PICK UP AND MAKE UP RBP RETRIEVAL TOOL -PJSM WITH RIG CREWAND HALLIBURTON REPRESENTATIVE -MAKE UP RETRIEVING HEAD TO FIRST STAND OF DRILL PIPE -VERIFY NO PRESSURE UNDER BLINDS; OPEN BLIND/SHEAR RAMS -BLOW DOWN CHOKE MANIFOLD. 14:00 - 14:30 0.50 CLEAN P OTHCMP SERVICE TOP DRIVE,BLOCKS AND DRAW WORKS 14:30 - 18:00 3.50 CLEAN P OTHCMP RUN IN THE HOLE WITH RBP RETRIEVING HEAD ON DRILL PIPE STANDS FROM DERRICK TO 7989'MD -PU 177K;SO 125K 18:00 - 19:00 1.00 CLEAN P OTHCMP WASH SAND AND DEBRIS OFF RBP PRIOR TO LATCHING AND UNSEATING. -TAKE SLOW PUMP RATES AT 7989'MD: -MW 9.8 PPG IN/OUT -MP#1:30/40 SPM;150/280 PSI -MP#2:30/40 SPM;140/270 PSI -OBTAIN PARAMETERS: -PU 177K;SO 125K;300 PSI AT 4 BPM -WASH SAND FROM TOP OF RBP AND SET DOWN 5K ON RBP -INCREASE FLOW RATE:600 PSI AT 5 BPM -PICK UP AND ATTEMPT TO PUT 5K OVERPULL ON RBP; -NO OVERPULL OBSERVED. -ROTATE STRING 1/4 TURN AND SLACK OFF, 10K ON RBP -PICK UP WITH 5K OVERPULL OBSERVED- RBP ENGAGED -SLACK OFF AND STACK 5K DOWN ON RBP -CIRCULATE 20 BBL HIGH-VIS SWEEP -1420 PSI AT 8.5 BPM -MINOR AMOUNT OF SAND AT SHAKERS WITH SWEEP. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 32 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'©55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 CLEAN P OTHCMP RELEASE RBP AND CIRCULATE WELL CLEAN -PJSM WITH RIG CREWAND HALLIBURTON REPRESENTATIVE -RELEASE RBP PER HALLIBURTON PROCEDURE -PU 210K TO RELEASE SLIPS(33K OVERPULL) CLOSE ANNULAR AND LINE UP TO TAKE RETURNS THROUGH MGS -CIRCULATE A BOTTOMS UP THROUGH THE MGS: -750 PSIAT6BPM -MW IN/OUT 9.8 PPG -FLOW CHECK WELL FOR 10 MIN:STATIC. 21:00 - 22:30 1.50 CLEAN P OTHCMP PRESSURE TEST 7"CASING,PRODUCTION PACKER AND PLUG IN TUBING TAIL;250/3500 PSI FOR 5/30 MIN -PJSM WITH RIG CREW -RIG UP HEAD PIN AND PRESSURE TESTING EQUIPMENT -FLUID PACK CHOKE AND KILL LINES -CLOSE UPPER PIPE RAMS -PUMP DOWN BOTH THE ANNULS AND THE DRILL STRING: -PRESSURE TEST TO 250 PSI LOW FOR 5 MIN:GOOD TEST -ATTEMPT TO PRESSURE TEST TO 3500 PSI HIGH FOR 30 MIN: -BLEED OFF 100 PSI IN FIRST 15 MIN. -BLEED OFF 75 PSI IN NEXT 10 MIN AND SHOW NO INDICATION OF STABILIZATION. -FAILED TO MEET INTEGRITY TESTING CRITERIA -NOTIFIED ODE OF FAILED PRESSURE TEST. 22:30 - 00:00 1.50 CLEAN P OTHCMP RUN IN THE HOLE WITH 7"RBP ON DRILL PIPE STANDS OUT OF THE DERRICK;FROM 8082'MD TO 9858'MD -UNABLE TO GET A PU WEIGHT;PULLED UP TO 250K. 10/10/2015 00:00 - 00:30 0.50 CLEAN P OTHCMP ATTEMPT TO BREAK CIRCULATION WITH RBP AT 9860'MD -PACKED OFF AND UNABLE TO GET RETURNS W/1100 PSI TRAPPED IN STRING. -WORK PIPE AT 9860'AND BLEED OFF PRESSURE -VERIFY PUMP LINE UP AND ATTEMPT TO BREAK CIRCULATION AGAIN WITH SAME RESULTS -BLEED OFF PRESSURE -SET RBP AT 9860'MD PER HALLIBURTON PROCEDURE -STILL PACKED OFF AND OBSERVING OVER PULLS OF 15-20K. -NOTIFY ODE AND AGREE ON PLAN FORWARD: -WORK SEVERAL STANDS UP HOLE, ATTEMPTING TO REGAIN CIRCULATION -AFTER REGAINING CIRCULATION, CIRCULATE HOLE CLEAN AND WASH BACK DOWN TO RBP. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 33 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'i 55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 01:00 0.50 CLEAN P OTHCMP WORK PIPE AND PULL FROM 9860'MD TO 9603'MD -OVER PULLS DROPPED OFF TO 5K OVER EXPECTED AT 9700'MD AND PIPE PULLED DRY -PU 230K;SO 140K 01:00 - 02:00 1.00 CLEAN P OTHCMP CIRCULATE A BOTTOMS UP -STAGE UP PUMPS TO 8 BPM;1350 PSI -NOTHING NOTABLE OBSERVED AT SHAKERS,SMALL AMOUNT OF SAND AND SOME SCHMOO. 02:00 - 04:30 2.50 CLEAN P OTHCMP WASH DOWN FROM 9603'MD AND TAG RBP AT 9860'MD -8 BPM;1370 PSI -TAG RBP AT 9860'MD WITH 5K -PICK UP 20';PU 225K;SO 130K -CIRCULATE 30 BBL HIGH-VIS SWEEP -8 BPM;1360 PSI -NOTHING NOTABLE OBSERVED AT SHAKERS WITH SWEEP. -SLACK OFF AND TAG RBP AGAIN AT 9860' MD -LATCH UP PLUG PER HALLIBURTON SOP AND PICK UP TO VERIFY SET -OVERPULL WITH 10K AND VERIFY SET -RELEASE FROM PLUG AND PICK UP 30' 04:30 - 06:30 2.00 CLEAN P OTHCMP PRESSURE TEST 7"CASING,PRODUCTION PACKER AND PLUG IN TUBING TAIL;250/3500 PSI FOR 5/30 MIN -PJSM WITH RIG CREW -BLOW DOWN TOP DRIVE -RIG UP HEAD PIN AND PRESSURE TESTING EQUIPMENT -FLUID PACK CHOKE AND KILL LINES -CLOSE UPPER PIPE RAMS -PUMP DOWN BOTH THE ANNULS AND THE DRILL STRING: -PRESSURE TEST TO 250 PSI LOW FOR 5 MIN:GOOD TEST -PRESSURE TEST TO 3500 PSI HIGH FOR 30 MIN: -LOST 50 PSI IN THE FIRST 15 MIN;15 PSI IN THE SECOND 15 MIN. -GOOD TEST;MET BP INTEGRITY TEST CRITERIA -BLOW DOWN TEST EQUIPMENT -RIG DOWN HEAD PIN 06:30 - 07:00 0.50 CLEAN P OTHCMP LATCH AND UNSEAT RBP -PJSM WITH RIG CREWAND HALLIBURTON REPRESENTATIVE -LATCH ONTO RBP AND RELEASE PER HALLIBURTON -PICK UP AND RUN IN THE HOLE TO VERIFY RBP RELEASED -PU 235K;SO 135K -PULL FROM 9870'MD TO 9790'MD;5-10K DRAG OBSERVED 07:00 - 10:30 3.50 CLEAN P OTHCMP PULL OUT OF HOLE FROM 9790'MD TO 5500' MD,STANDING BACK DRILL PIPE IN DERRICK -PU 135K,SO 137K;5-7K DRAG NOTED Printed 11/11/2015 3:38:O5PM S • North America-ALASKA-BP Page 34 of 69 Operation Summary Report Common Well Name:11-22 1 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 1X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:30 1.00 CLEAN P OTHCMP KICK WHILE TRIPPING DRILL AND AAR. -FLOW WAS GIVEN THROUGH THE INNER ANNULUS AT 1/2 BPM -WELL SECURED;6 BBL TOTAL PIT GAIN -2 FAILURES WERE GIVEN IN THE DRILL; REMOTE BOP PANEL AND SUPER CHOKE FAILURE PERFORMED AN AFTER ACTION REVIEW IN THE DOG HOUSE 11:30 - 12:00 0.50 CLEAN P OTHCMP CONTINUED PULLING OUT OF HOLE FROM 5500'MD TO 4860'MD -PU 137K;SO 137K;5-7K DRAG NOTED 12:00 - 12:30 0.50 CLEAN P OTHCMP SERVICE AND INSPRECT TOP DRIVE AND DRAW WORKS 12:30 - 15:00 2.50 CLEAN P OTHCMP CONTINUED PULLING OUT OF HOLE FROM 4860'MD TO SURFACE 15:00 - 15:30 0.50 CLEAN P OTHCMP LAY DOWN HALIBURTON RBP -PJSM WITH RIG CREW AND HALLIBURTON REPRESENTATIVE -BREAK OUT AND LAY DOWN RBP UNANNOUNCED DRILL:KICK DRILL WHILE OUT OF HOLE -DRILLER OBSERVED GAIN -WELL WAS SECURED AND MONITORED PRESSURE VIA THE CHOKE -PERFORMED AN AFTER ACTION REVIEW IN THE DOG HOUSE 15:30 - 16:30 1.00 CLEAN P OTHCMP CLEAN AND CLEAR RIG FLOOR -CLEAR RIG FLOOR -MOBALIZED BAKER BHA#9,PACKER MILLING ASSY TO RIG FLOOR 16:30 - 18:00 1.50 CLEAN P OTHCMP MAKE UP BAKER BHA#9,PACKER MILLING ASSY -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -PICK UP AND MAKE UP BHA AS FOLLOWS: -6"x 3 11/16"PAKER MILL,(4)4 3/4"BOOT BASKET,BIT SUB,BUMPER SUB AND OIL JAR, PUMP OUT SUB,XO,AND(9)4 3/4"DRILL COLLARS -OAL=314.49' 18:00 - 21:30 3.50 CLEAN P OTHCMP RUN IN HOLE WITH PACKER MILLING ASSY ON DRILL PIPE STANDS OUT OF THE DERRICK -FROM 315'TO 9806'MD -PU 245K;SO 137 21:30 - 23:00 1.50 CLEAN P OTHCMP SLIP AND CUT DRILLING LINE -PJSM WITH RIG CREW -CUT 60'OF DRILL LINE -SERVICE TOP DRIVE AND BLOCKS 23:00 - 00:00 1.00 CLEAN P OTHCMP INSPECT SAVER SUB AND CALIBRATE BLOCK HEIGHT 10/11/2015 00:00 - 01:30 1.50 CLEAN P OTHCMP DISPLACE WELL TO 8.5PPG SEAWATER -PJSM WITH RIG CREW -DISPLACE WELL 8.5 PPG IN/OUT Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 35 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW:500292203500 Active datum:11-22A KBE 55.3' r©D55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 03:00 1.50 CLEAN P OTHCMP MILL PACKER AT 9887'MD -OBTAIN PARAMETERS: -PU 260K;SO 140K;ROT 178K;80 RPM;12K TORQUE -620 PSI AT 5 BPM -SLOW PUMP RATES AT 9887'MD;8.5 PPG SEAWATER -MP#1:30/40 SPM;200/400 PSI -MP#2:30/40 SPM;220/420 PSI -TAG PACKER AND BEGIN MILLING ON PACKER PER BAKER FISHING -80 RPM;12K TORQUE,7K WOB. 03:00 - 06:30 3.50 CLEAN P OTHCMP CIRCULATE OUT PACKER GAS -FLOW CHECK WELLAND OBSERVE A SMALL AMOUNT OF GAS BREAKING OUT. -SHUT-IN AND ATTEMPT TO BULLHEAD PACKER GAS PER WELL PROGRAM -UNABLE TO MOVE FLUID DOWNHOLE: -5 BBLS AWAY PRESSURED UP TO 2890 PSI AND DID NOT BLEED OFF -BLEED OFF PRESSURE AND LINE UP TO CIRCULATE OUT PACKER GAS THROUGH THE MGS. CIRCULATE 2X BOTTOMS UP; -500 PSI AT 4 BPM -FLOW CHECK WELL;STATIC 06:30 - 08:30 2.00 CLEAN P OTHCMP CONTINUE MILLING PACKER AS PER BAKER REPRESENTATIVE -PU 260K;SO 140K;ROT 178K;60 RPM; 12-13K TORQUE;WOB 5-10K -650 PSI AT 5 BPM -PUMP HI VIS SWEEP: -210 PSI AT 3 BPM -LOST CIRCULATION AFTER PUMPING 133 BBLS(85 BBLS BEFORE BOTTOMS UP) 08:30 - 09:00 0.50 CLEAN P OTHCMP BULLHEAD PER WELL PROGRAM -BULL HEAD 100 BBLS AT 10 BPM 09:00 - 14:30 5.50 CLEAN P OTHCMP CONTINUE MILLING PACKER AT 9899'MD -PU 260K;SO 140K;ROT 178K;30-60 RPM; 12-13K TORQUE;WOB 10-20K;1.8 BPM -CONTINUE FILLING BACKSIDE -8.5 PPG SEAWATER AT 3OBBLS PER HOUR -NO RETURNS -PUMP 15 BBL HIGH-VIS PILL DOWN BACK SIDE -RE-GAINED RETURNS -FLOW CHECKED THE WELL;STILL ON LOSSES -OBTAIN STATIC LOSS RATE OF 30-35 BPH CONTINUE MILLING ON PACKER AT 9899'MD WITH THE SAME PARAMETERS -420 PSI AND 4 BPM DOWN THE DRILL STRING -CONTINUE FEEDING THE WELL 30-35 BPH DOWN THE ANNULUS -PACKER CAME FREE AND STARTED MOVING DOWN THE HOLE. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 36 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:OOAM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 15:30 1.00 CLEAN P OTHCMP CHASE AND PUSH THE PACKER DOWN THE HOLE TO 10,492'MD -SET 5K DOWN SEVERAL TIMES TO PUSH PACKER DOWN TO 10,492'MD -PU 275K;SO 104K;ROT 190K;60 RPM;13.5K TORQUE -WASH/REAM DOWN AND TRY AND PUSH/MILL ON PACKER FURTHER -420 PSI AT 4 BPM -CONTINUE TO FEED THE WELL AT 30-35 BPH DOWN THE ANNULUS -NOT MAKING ANY NOTICABLE PROGRESS -SHUT DOWN PUMPS AND ROTARY AND SET DOWN 15K(2X)ON PACKER: -NO MOVEMENT 15:30 - 16:00 0.50 CLEAN P OTHCMP TAKE SLOW PUMP RATES AT 10,492'AND SPOT A HIGH-VIS PILL ON BOTTOM -SLOW PUMP RATES AT 10,492'MD,8.5 PPG SEAWATER -MP#1 30/40 SPM;320/420 PSI -MP#2 30/40 SPM;310/420 PSI -SPOT 25 BBL HIGH-VIS PILL ON BOTTOM -560 PSI AT 5 BPM -FLOW CHECK WELL PRIOR TO PULLING OFF BOTTOM;STILL ON LOSSES -STATIC LOSS RATE OF 30-35 BPH 16:00 - 20:00 4.00 CLEAN P OTHCMP PULL OUT OF THE HOLE WITH BHA#9, PACKER MILLING ASSY FROM 10,492'MD TO 350'MD -PJSM WITH RIG CREW -BLOW DOWN TOP DRIVE -FLOW CHECK WELL PRIOR TO PULLING BHA THROUGH THE STACK;STILL ON LOSSES 20:00 - 21:00 1.00 CLEAN P OTHCMP PULL AND LAY DOWN BHA#9,PACKER MILLING ASSY -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -STAND BACK 4 3/4"DRILL COLLARS -LAY DOWN PACKER MILL,XO,(3)BOOT BASKETS,JARS AND BUMPER SUB -CLEAN BOOT BASKETS; -RECOVERED 35 LBS OF DEBRIS OUT OF BOOT BASKETS -CLEAN AND CLEAR RIG FLOOR -CONTINUE TO FEED THE WELL 30 BPH DOWN THE ANNULUS 21:00 - 22:30 1.50 WHSUR P OTHCMP FLUSH STACK AND PULL WEAR RING -PICK UP STACK WASHER AND FLUSH STACK AT 14 BPM -WORK STACK WASHER THROUGH STACK 3X -LAY DOWN STACK WASHER -PJSM WITH RIG CREWAND PULL AND LAY DOWN WEAR RING Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 37 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:30 1.00 BOPSUR P OTHCMP SET TEST PLUG AND RIG UP TO TEST BOPE -PJSM WITH RIG CREW -MAKE UP 2-7/8"TEST JOINT AND SET TEST PLUG -RUN IN 4 LOCK DOWN SCREWS -RIG UP TEST EQUIPMENT ON RIG FLOOR TO TEST BOPE WELL KILL DRILL -TOOK 6 BBLS TO FILL GAS BUSTER -PERFORMED AFTER ACTION REVIEW -CONTINUE TO FEED THE WELL 30 BPH DOWN THE ANNULUS 23:30 - 00:00 0.50 BOPSUR P OTHCMP AOGCC GIVEN NOTIFICATION OF BOPE TEST 10-09-2015 AT 22:33 HRS. AOGCC INSPECTOR BOB NOBLE WAIVE WITNESS 10-11-2015 AT 11:16 HRS PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#195-087,AND BP PRACTICE 100218. -TEST ALL BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN. TEST ANNULAR WITH 2 7/8"TEST JOINT, HCR KILL,AND CHOKE VALVES 1,12,13,14 -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST PRIOR TO SHELL TEST.PJSM WITH RIG CREW -CONTINUE TO FEED THE WELL 30 BPH DOWN THE ANNULUS Printed 11/11/2015 3:38:05PM i i North America-ALASKA-BP Page 38 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3't55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/12/2015 00:00 - 05:30 5.50 BOPSUR P OTHCMP AOGCC GIVEN NOTIFICATION OF BOPE TEST 10-09-2015 AT 22:33 HRS. AOGCC INSPECTOR BOB NOBLE WAIVE WITNESS 10-11-2015 AT 11:16 HRS PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#195-087,AND BP PRACTICE 100218. -TEST ALL BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN. -TEST BLOWOUT PREVENTERS AND ALL ASSOCIATED BOPE. -LOWER 3 1/2"X 6"VBR TESTED WITH 4" AND 4 1/2"TEST JOINT. -UPPER 2 7/8"x 5"VBR TESTED WITH 2 7/8", 4"AND 4 1/2"TEST JOINT. -ANNULAR TESTED WITH 2 7/8"TEST JOINT. -BLIND/SHEAR RAMS TESTED. -TEST CHOKE MANIFOLD VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES. -TEST MANUAL AND HYDRAULIC IBOP ON TOP DRIVE. -TEST FOSVS AND DART VALVE. -PERFORM DRAW DOWN TEST OF ACCUMULATOR. -FUNCTION BOPE FROM REMOTE PANEL AND MAIN UNIT. -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST PRIOR TO SHELL TEST. -CONTINUE TO FEED THE WELL 30 BPH DOWN THE ANNULUS 05:30 - 06:30 1.00 BOPSUR P OTHCMP PJSM AND RIG DOWN FROM BOPE TEST. -RIG DOWN TEST EQUIPMENT,CLEAR FLOOR. -BLOW DOWN CHOKE/KILL/BLEEDER LINES. -STATIC LOSS RATE=15 BPH 06:30 - 07:00 0.50 BOPSUR P OTHCMP TEST ALL GAS ALARMS FOR BOPE TEST -NO FAILURES SIMOPS: -MOBILIZE SPEAR ASSY COMPONENTS TO RIG FLOOR -CONTINUE TO FEED THE WELL 30 BPH DOWN THE ANNULUS 07:00 - 08:30 1.50 CLEAN P OTHCMP PICK UP AND RUN IN THE HOLE WITH BHA #10,PACKER SPEAR ASSY TO 313'MD -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -PICK UP AND MAKE UP BHA AS FOLLOWS: -3 1/4"ITCO SPEAR,XO,BUMPER SUB AND OIL JAR,PUMP OUT SUB,XO,AND(9)4 3/4" DRILL COLLARS,XO,INTENSIFIER,XO -OAL=313.62' -PU 65K -CONTINUE TO FEED THE WELL 30 BPH DOWN THE ANNULUS Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 39 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 13:00 4.50 CLEAN P OTHCMP RUN IN THE HOLE WITH BHA#10,PACKER SPEAR ASSY,FROM 313'MD TO 10,187'MD ON DRILL PIPE STANDS OUT OF THE DERRICK -PU 235K;SO 160K 13:00 - 14:30 1.50 CLEAN P OTHCMP WASH DOWN AND SPEAR FISH AT 10,492'MD -OBTAIN PARAMETERS: -PU 235K;SO 160K;7 BPM;1570 PSI -WASH DOWN FROM 10,187'MD JUST ABOVE FISH AT 10,492'MD -ADDING SAFE-LUBE TO FLUID TO HELP REDUCE DRAG -REDUCE FLOW RATE TO 1 BPM AND ENGAGE FISH -PICK UP WITH 40K OVER PULL 2X,SETTING OF JARS -CONTINUE TO PICK UP WITH 90K OVERPULL AND PULL FISH FREE 40-50K DRAG OBSERVED PULLING FIRST STAND -BLOW DOWN TOP DRIVE -CONTINUE TO FEED THE WELL AT 30 BPH 14:30 - 15:30 1.00 CLEAN P OTHCMP PULL OUT OF THE HOLE WITH BHA#10 AND FISH,FROM 10,492'MD TO 10,200'MD -FISH CONTINUES TO HANG UP,OVER PULLS OF 40-50K REQUIRED -FISH SWABBING -WORK PIPE 30'SEVERAL TIMES WITH FISH AT 10,200'MD -SWABBING STOPPED -OBTAIN A STATIC LOSS RATE OF 55 BPH. 15:30 - 22:00 6.50 CLEAN P OTHCMP CONTINUE TO PULL OUT OF THE HOLE WITH BHA#10 AND FISH,FROM 10,200'MD TO 350' MD -FROM 10,200'MD TO 7985'MD: -10-20K DRAG OBSERVED -FEED THE WELL 30 BPH+PIPE DISPLACEMENT DOWN THE ANNULUS -15K OVERPULL ENCOUNTERED AT 7985'MD (TRANSISTION BETWEEN 7"LINER AND 7" TIE-BACK) -WORK PIPE WITH 30-50K OVERPULLS AND JAR SEVERAL TIMES -FISH CAME FREE WITH 70K OVERPULL AFTER HITTING WITH JARS -CONTINUE TO PULL OUT OF THE HOLE TO 350'MD -CONTINUE TO FEED THE WELL 30 BPH+ PIPE DISPLACEMENT DOWN THE ANNULUS -MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING BHA THROUGH THE STACK -STILL ON LOSSES IN EXCESS OF 40 BPH Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 40 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'©55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 CLEAN P OTHCMP PULL AND LAY DOWN BHA#10,SPEAR ASSY. -PJSM WITH RIG CREWAND BAKER FISHING -MOBILIZE TUBING PUNCH AND 4 1/2" HANDLING EQUIPMENT TO RIG FLOOR -PULL AND LAY DOWN(3)4 3/4"DRILL COLLARS TO THE PIPE SHED -STAND BACK(2)STANDS OF 4 3/4"DRILL COLLARS IN DERRICK. -PICK UP AND EXPOSE FISH -RIG UP TUBING PUNCH AND PUNCH TUBING BELOW PACKER. 10/13/2015 00:00 - 02:00 2.00 CLEAN P OTHCMP CONTINUE TO LAY DOWN BHA#10 AND FISH -BREAK TUBING CONNECTION BELOW PACKER AND LAY DOWN SPEAR ASSY WITH TOP OF FISH -CHANGE TO 4 1/2"ELEVATORS TO HANDLE FISH -PUNCH TUBING ABOVE AND BELOW'X' NIPPLE WITH TUBING PLUG -LAY DOWN FISH TO PIPE SHED -CONTINUE TO FEED THE WELL AT 30 BPH 02:00 - 04:00 2.00 CLEAN P OTHCMP CLEAN AND CLEAR RIG FLOOR AND MOBILIZE CLEAN OUT ASSY COMPONENTS TO RIG FLOOR -RIG DOWN TUBING PUNCH -CLEAR RIG FLOOR OF UNNECESSARY TOOLS AND EQUIPMENT -CHANGE OUT HANDLING EQUIPMENT FOR NEXT RUN -MOBILIZE TOOLS AND EQUIPMENT FOR NEXT RUN TO RIG FLOOR -RIG UP TONGS TO MAKE UP 2 7/8"HT PAC. -CONTINUE TO FEED THE WELL AT 30 BPH. 04:00 - 06:00 2.00 CLEAN P OTHCMP PICK UP AND RUN IN THE HOLE WITH BHA #11,CLEAN OUT ASSY -PJSM WITH RIG CREW,BAKER FISHING AND DOYON CASING -MAKE UP BHA#11 AS FOLLOWS: -3.70"JUNK MILL,BIT SUB,XO,(1)JT OF 2 7/8"HT PAC,XO -6.059"OD STRING MILL,DOUBLE PIN SUB, (3)4 3/4"BOOT BASKETS,BIT SUB -BUMPER SUB AND JARS,PUMP OUT SUB, (6)4 3/4"DRILL COLLARS -OAL=268.52' -RIH TO 648',PUMP AT 6 BPM,W/710 PSI WHILE FILLING THE BACKSIDE AT 60 BPH-NO RETURNS 06:00 - 12:00 6.00 CLEAN P OTHCMP TIH WITH BHA#11,CLEAN OUT ASSY -RIG FROM 648'TO 7,959' -PUVV-192K,SOW-135K ROT-155K -MAINTAIN CONTINUOUS HOLE FILL AT 30 BPH WHILE TRIPPING IN THE HOLE. -WASH DOWN FROM 7,959'TO 8,004' -3 BPM,10 PSI WITH 30 RPM,5K TQ-NO TIGHT SPOTS OBSERVED -TIH FROM 8,004'TO 9,667' -WASH DOWN FROM 9,667'MD TO 10,427'MD --PUW-245K,SOW-160K ROT-190K -3 BPM,10 PSI WITH 40 RPM,7K TQ-NO TIGHT SPOTS OBSERVED -NO RETURNS WHILE PUMPING. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 41 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 15:00 3.00 CLEAN P OTHCMP CONTINUE WASHING AND REAMING DOWN FROM 10,427'MD TO 10,807'MD -3 BPM,40 PSI WITH 40 RPM,10K FREE TQ- TIGHT SPOTS A T10,490'AND 10,714'MD -TORQUED UP AND STALLED OUT WITH 12 K TQ WASHED AND REAMED THROUGH BOTH SPOTS WITH 3 BPM 40 PSI,60 RPM AND MAX TQ OF 14K -OBTAIN PARAMETERS AT 10,807' -PUW-255K,SOW-155K, -WASH DOWN WITH 3 BPM,40 PSI TO 10,870'TAG TOP OF 7"X 4-1/2"TIW PACKER, SET DOWN TO NO-GO WITH 5K TWICE. WASH AND REAM DOWN WITH 3 BPM,40 PSI ,30 RPM,PUMP PRESSURE INCREASED TO 100 PSI,INDICATING MILL ENTERING THE LINER TOP PACKER -SHUT DOWN ROTARY AND WASH DOWN TO 10,907' 15:00 - 17:30 2.50 CLEAN P OTHCMP POOH FROM 10,907'TO 10,807' -PJSM FOR POOH -MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM,WELL ON LOSSES- -PUMP 40 BBL HIGH-VIS SPILL/SWEEP, SPOTTING ON BOTTOM FROM 10,807' -PUMP PILL AT7 BPM W/1040 PSI,WHILE PUMPING IN THE BACKSIDE AT 60 BPH- OBSERVED SLIGHT RETURNS 1-2% MONITOR WELL FOR LOSS RATE-LOSS RATE GREATER THAN 360 BPH. -POOH FROM 10,807'TO 9,841,W/80 BPH FILL RATE SPOTA SECOND 30 BBL HIGH VIS PILL 17:30 - 23:30 6.00 CLEAN P OTHCMP POOH WITH BOT CLEAN OUT BHA FROM 9,841'TO 268' -PUW-255K,SOW-150K -MAINTAIN CONTINUOUS HOLE FILL AT 80 BPH PLUS PIPE DISPLACEMENT FOR ENTIRE TRIP OUT OF THE HOLE. -FLOW CHECK THE WELL PRIOR TO NON-SHEARABLES ACROSS THE STACK -PJSM FOR LD BHA. -LAY DOWN COLLARS AND BOT CLEAN OUT BHA PER BAKER REP DIRECTION 23:30 - 00:00 0.50 CLEAN P OTHCMP CLEAN AND CLEAR RIG FLOOR OF BHA -PJSM -CLEAN BOOT BASKETS,RETRIEVE 7 LBS OF SAND&METAL DEBRIS 10/14/2015 00:00 - 06:00 6.00 CLEAN P OTHCMP CONTINUE CLEARING RIG FLOOR OF CLEAN OUT BHA. MAKE UP 4-1/2"EZ DRILL BRIDGE PLUG -PJSM FOR PICKING UP EZ DRILL -PU/MU BHA#12 EZ DRILL BRIDGE PLUG CROSSED OVER TO SINGLE JOINT OF 2-7/8" PACK PIPE -50.38'OAL -RIH WITH CIBP ON 4"DP -MAINTAIN 80 BPH HOLE FILL Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 42 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 09:00 3.00 CLEAN P OTHCMP CONTINUE RIH WITH CIBP ON 4"DP FROM SURFACE TO 10,870'MD -PJSM WITH RIG CREW -FILL BACK SIDE @ 80 BBLS/HR,NO RETURNS 09:00 - 10:00 1.00 DHB P OTHCMP SET EZ DRILL PLUG P/U SINGLE AND MAKE UP T/D -PJSM WITH RIG CREW AND THIRD PARTY -WASH DOWN F/10870'MD -T/10,890'MD AS PER HALIBURTON REPRESENTATIVE CIRCULATE @ 4 BPM -70 PSI PUMP PRESSURE -PUW=275K,SOW=145K SET PLUG @ 10,886'MD AS PER HALIBURTON REPRESENTATIVE -38 TURNS RIGHT -SHEARED @ 56K OVER PULL P/U T/10870'MD -SPOT HI VIS SWEEP ON BOTTOM -@ 620 STROKES PUMPED WE GOT RETURNS -TOTAL OF 1150 STROKE PUMPED 7 BPM=960 PSI 10:00 - 11:00 1.00 CLEAN P OTHCMP POOH WITH EZ DRILL RUN TOOL ON 4"DP F10,870' L/D SINGLE AND POOH -PJSM WITH RIG CREW -F/10870',T/9924'MD -PUW=257K -FILL ON BACK SIDE @ 80 BBLS/HR -NO RETURNS SPOT HI VIS SWEEP -@ 9924'MD,6BPM -PUMP PRESSURE=720 PSI -@ 460 STROKES PUMPED WE GOT RETURNS 11:00 - 12:00 1.00 CLEAN P OTHCMP SLIP AND CUT DRILL LINE B/D AND T/D -PJSM WITH RIG CREW -74',11 WRAPS -FILLING BACK SIDE @ 80 BBLS/HR,NO RETURNS 12:00 - 14:30 2.50 CLEAN P OTHCMP CONTINUE WITH SLIP AND CUT DRILLING LINE -PJSM WITH RIG CREW SERVICE AND INSPECT TOP DRIVE -PJSM WITH RIG CREW -UNSCREW FROM STUMP AND INSPECT SAVER SUB ON TOP DRIVE -CHECK HOSES AND CONNECTIONS 14:30 - 15:00 0.50 CLEAN P OTHCMP PUMP 27 BBL HI VIS PILL AT 9924' -3BPM,80 PSI CHASED WITH 8.5 SEA WATER -AT 598 STROKES WE GOT RETURNS -3BPM 1080 NO RETURNS -4BPM=320 PSI 1%FLOW -5BPM=510 PSI 8%FLOW -6BPM=670 PSI 12%FLOW -7 BPM=840 PSI 15%FLOW LOSS RATE AT 3PM WHILE CIRCULATING -FCP @ 6 BPM=610 PSI Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 43 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 17:30 2.50 CLEAN P OTHCMP LINE UP AND PUMP 250 BBLS OF DUO-VIS PILL FROM VAC TRUCK -PJSM WITH RIG CREW -4 BPM=350 PSI -5BPM=610PSI -6BPM=610 PSI GOT RETURNS AT 325 STROKES IN TO PUMPING 14%FLOWAT 6 BPM AT 1700 STROKES INTO PUMPING PILL 6 BPM =680 PSI 15%FLOW 250 BBLS CHASE PILL WITH 8.5 SEAWATER -5 BPM=560 PSI 10%FLOW -6 BPM=670 PSI 14%FLOW FCP @ 6BPM=700 PSI 14%-15%FLOW SHUT DOWN PUMPS TO FLOW CHECK WELL LOSS RATE AT60 BPH 17:30 - 22:30 5.00 CLEAN P OTHCMP POOH WITH CIBP SETTING TOOL -PJSM WITH RIG CREW -F/9924'TO 50' -PU W=250K,SOW=135K -MAINTAIN CONTINUOUS HOLE FILL DURING TRIP -60 BPH LOSS AVERAGE WITH RETURNS -POOH PLUS PIPE DISPLACEMENT 22:30 - 23:30 1.00 CLEAN P OTHCMP LAY DOWN CIBP RUN TOOL BHA AS PER HES REP -PJSM WITH RIG CREWAND THIRD PARTY -CLEAN AND CLEAR RIG FLOOR - LAYING DOWN HALIBURTON RUNNING TOOL -P/U CROSSOVER FOR TUBING RUN 23:30 - 00:00 0.50 CLEAN P OTHCMP RIG UP TO RUN 4.5"12.6#HYDRILHYDRIL 521 TUBING(SCAB LINER) -PJSM WITH RIG CREWAND THIRD PARTY 10/15/2015 00:00 - 01:00 1.00 TIEBAC P OTHCMP CONTINUE RIG UP FOR RUN 4.5"HYDRILL SCAB LINER. -RU CASING RUNNING TOOLS.-VERIFY CORRECT TONG HEAD SIZE -RU SAFETY JOINT AND VERIFY CORRECT XO TO THE LINER -DRILLER AND LEAD FLOOR HAND VERIFIED THE CORRECT SIZE ELEVATORS -WSL VERIFY WITH BOT REP FOR CORRECT LINER TALLY AND HANGER EQUIPMENT. -WSL,DDI DRILLER,BOT REP AND TOOL PUSHER TO VERIFY CORRECT PIPE COUNT PRIOR TO LINER RUN, 01:00 - 04:00 3.00 TIEBAC P OTHCMP RUN 4.5"12.6#521 HYDRILL SCAB LINER F/ SURFACE TO 1,035' -PJSM FOR LINER RUNNING OPERATIONS -REVIEW DDI PROCEDURES,DISCUSS RED ZONE AND DROPPED OBJECT HAZARDS. -PU FLOAT EQUIPMENT FILL PIPE AND CHECK FLOATS-FLOATS GOOD -RIH WITH 4.5"LINER -PU&RUN TOTAL OF 24 JOINTS USING TORQUE TURN AND JET LUBE SEAL GUARD -CONTINUOUS HOLE FILL WITH 8.4 PPG SEAWATER AT 60-80 BPH -VERIFY CORRECT 4.5"LINER COUNT IN PIPE SHED PRIOR TO RUNNING IN THE HOLE ON DP Printed 11/11/2015 3:38:05PM i • North America-ALASKA-BP Page 44 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs ( Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 13:30 9.50 TIEBAC P OTHCMP RIH WITH 4.5"12.6#521 HYDRILL SCAB LINER ON 4"DP F/1,035'TO 10,830' -MAKE UP BAKER 5"X 7"LINER HANGER ASSEMBLY PER BOT REP -WSLAND BOT REP VERIFY CORRECT SHEAR PINS FOR SETTING. -PU FIRST FULL STAND&CIRCULATE LINER VOLUME PLUS 15 BBLS -CIRCULATE AT 6 BPM WITH 70-90 PSI AND FULL RETURNS -RIH WITH 4.5"LINER ON 4"DP STANDS. FILLING PIPE EVERY 10 STANDS -MAINTAIN CONTINUOUS HOLE FILL WITH 8.4 PPG SEAWATER-AVG LOSS RATE AT 60 BPH WASH DOWN FROM 10,830'TO 10,851 -4 BPM,491 PSI -MAKE UP CEMENT HEAD AND 25'JNT OF DP,RIH TO 10,870'SET DOWN 10K TWICE,PU AND ROTATE 1/2 TURN&SET BACK DOWN IN THE SAME PLACE TO VERIFY CORRECT PLACEMENT OF SCAB LINER SHOE. 13:30 - 14:00 0.50 TIEBAC P OTHCMP CIRCULATE DOWN THE DRILL STRING -3 BPM,430 PSI,12%FLOW OUT. -4 BPM,550 PSI,16%FO -5 BPM,640 PSI,16%FO -SHUT DOWN AND LINE UP FOR CEMENT JOB -LOSS RATE SLOWED TO—20 BPH Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 45 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 18:00 4.00 TIEBAC P OTHCMP CEMENT4-1/2"12.6#521 HYDRILLSCAB LINER AS FOLLOWS -PJSM FOR PRESSURE TESTING& CEMENTING OPERATIONS -REVIEW PRESSURE CROSS CHECK CHECKLIST-SET&TEST HIGH PRESSURE TRIPS ON CEMENT PUMP UNIT. -PRESSURE TEST CEMENT LINES TO 250 PSI LOW 4500 PSI HIGH FOR 5 MIN EA-GOOD TEST PUMP 45 BBLS OF 15.8 PPG CLASS 6 TAIL CEMENT AT 6 BPM,25 BBLS EXCESS -DROP DRILL PIPE WIPER DART -DISPLACE WIPER DART WITH SLB PUMP TRUCK -DISPLACE WITH 8.5 PPG SEAWATER -95 BBLS DISPLACED AT 6 BPM,ICP-343 PSI, FCP-1044 PSI RATE REDUCED TO 3 BPM-LATCH UP CONFIRMED AT 98.2 BBLS DISPLACED -10 BBLS AT 3 BPM,ICP-335 PSI,FCP-600 PSI -REDUCED RATE TO 2 BPM FOR BUMP -BUMPED PLUG AT 2 BPM WITH 114 BBLS TOTAL DISPLACEMENT:FINAL CIRCULATING PRESSURE 950 PSI -RECIPROCATE PIPE 32'AT SURFACE DURING DISPLACEMENT. -INCREASE PRESSURE TO 2600 PSI TO SET HANGER AS DIRECTED BY BAKER OIL TOOL REP. -INCREASE PSI TO 3500,BLEED OFF PRESSURE AND CHECK FLOATS-FLOATS HOLDING -SET DOWN 15K TO CONFIRM HANGER SET -ROTATE 20 TURNS TO THE RIGHT,PUW 235K,EXPOSE DOG SUB AND PRESSURE UP TO 700 PSI ON STRING -PU TO REMOVE PACK OFF,MARK FOR NO GO.&CIRCULATE OUT EXCESS CEMENT OFF LINER TOP -PU RUNNING TOOL ABOVE LINER TOP AND MARK NO-GO,CIRCULATE 1.5X BU -6 BPM,630 PSI -ESTIMATED 20 BBLS OF CEMENT RETURNED TO SURFACE -TOTAL 35 BBLS LOSSED DURING CEMENT JOB. CEMENT IN PLACE AT 16:05 18:00 - 18:30 0.50 TIEBAC P OTHCMP FLOW CHECK THE WELL 10 MIN-WELL STATIC -RIG DOWN CEMENT HEAD -TAKE SPR'S -PULL AND LD 25'SINGLE Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 46 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 00:00 5.50 TIEBAC P OTHCMP POOH WITH LINER HANGER RUNNING TOOL ON 4'DP -POOH RACKING BACK FROM 9,779' TO 1140' M -PUW-75,SOW-75K -MONITOR TRIP ON TRIP TANK-HOLE TAKING THE CORRECT HOLE FILL **RIG MEETING WITH DDI RIG CREWAND BP MANAGEMENT** -WELLS VP LINA SERPA,RWO TL RICH BURNETT 10/16/2015 00:00 - 01:30 1.50 CLEAN P OTHCMP CONTINUE POOH LAYING DOWN SINGLES FROM 1140'TO SURFACE -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT HOLE FILL 01:30 - 03:00 1.50 CLEAN P OTHCMP CLEAN&CLEAR RIG FLOOR -PJSM FOR LAYING DOWN TOOLS -LD RUNNING TOOL PER THE BOT REP 03:00 - 05:00 2.00 CLEAN P OTHCMP RINSE AND FUNCTION THE BOP STACK TO ENSURE ALL VOIDS ARE FREE OF CEMENT -PU AND MAKE UP THE STACK WASHER -FLUSH THE STACK WITH BLACK WATER PILL -350 GPM, 05:00 - 06:30 1.50 CLEAN P OTHCMP MOBILIZE THE 4.5"DRILL OUT ASSEMBLY ON 2-7/8"X 4"DP -PJSM FOR PICKING UP BHA,MAKE UP BHA AS DIRECTED BY BOT REP OAL LENGTH OF BHA WITH THE 2-7/8"HT PAC =1373.11 06:30 - 10:00 3.50 CLEAN P OTHCMP RIG MEETING WITH BP MANAGEMENT AND DDI RIG PERSONEL -GWO VP LINA SERPA,RWO TL RICH BURNETT,FIELD SUPT DARRELL GREEN DERRICK INSP PERFORMED BY BILL HOPKINS 10:00 - 11:00 1.00 CLEAN P OTHCMP PRESSURE TEST LINER -PJSM FOR PRESSURE TESTING OF 4.5" LINER -FILL CHOKE AND KILL LINES/PT 250/3500 5 MIN EACH—GOOD TEST -BLOW DOWN CHOKE AND KILL LINES 11:00 - 16:00 5.00 CLEAN P OTHCMP MAKE UP CLEAN OUT BHA#12 FROM SURF TO 1,373' -PJSM FOR PICKING UP BHA,MAKE UP BHA AS DIRECTED BY BOT REP -USE DDI CASING TO M/U SMALL TUBULAR BHA WITH POWER TONGS -P/U FIRST STAND OF DRILL PIPE TO 1,460', CIRC THROUGH DRILL STRING - 3 BPM=520 PSI 4 BPM=850 PSI 5 BPM =1370 PSI -SHUT DOWN PUMP,BREAK OUT FROM STRING,BLOW DOWN TOP DRIVE -OAL LENGTH OF BHA WITH THE 2-7/8"HT PAC=1373.11 Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 47 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:OOAM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 21:30 5.50 CLEAN P OTHCMP RIH WITH 4.5"DRILL OUT ASSEMBLY ON 4"DP -PJSM FOR RIH F/1460'MD OUT OF DERRICK T/9727'MD -OBTAIN PARAMETERS PRIOR TO GOING INTO LINER TOP -30 SPM=700 PSI -40 SPM=1120 PSI - PUW=235K,SOW=150K,ROT=175K FREE TORQUE=20 RPM-6K TQ,40 RPM 7K TQ,50 RPM-9K TQ -RIH F/9,727'MD TO 10,565'TAG CEMENT STRINGER -WASH AND REAM PAST TO 10,570'SET DOWN ON SOLID CEMENT 21:30 - 22:30 1.00 CLEAN P OTHCMP CIRCULATE SURFACE TO SURFACE WITH SAFE LUBE -5 BPM WITH 1830 PSI -PUW-220K,SOW-150K ROT-177K -8.4 PPG SEAWATER 22:30 - 00:00 1.50 CLEAN P OTHCMP -WASH AND REAM CEMENT FROM 10,570'TO 10,600' -5 BPM,1820 PSI,40-50 RPM 7-9K TQ, WOB 1-2 K MAX TQ SET AT 11K 10/17/2015 00:00 - 02:30 2.50 CLEAN P OTHCMP CONT TO DRILL CEMENT -CONT.TO DRILL CEMENT,ESTABLISH PARAMETERS -220K PUW,150K SOW,177K ROT,20 RPM 7K FREE TQ,40 RPM 8K FREE TQ,5 BPM=1800 PSI -DRILL DOWN TO 10,600',MADE CONNECTION -AFTER CONNECTION BEGAN WASHING AND REAMING AT SAME PARAMETERS AS ABOVE, STALLED OUT ON ROTARY,ATTEMPTED TO PULL UP OUT UNSUCCESSFULLY -ATTEMPTED SEVERAL TIMES WITH 25 K MAX OVERPULL BEFORE RACKING BACK STAND. -WORKED STRING WITH PUMPS ON AND OFF ATTEMPTING TO FREE STRING. -SET JARS TWO TIMES W/30K,TWO TIMES WITH 40K,STRING CAME FREE JARRING WITH 50K -WORKED STING UP WHILE TRYING TO ROTATE-TOP DRIVE STILL STALLING OUT. -POOH WITH STRING TO ABOVE THE 4-1/2" LINER FROM 10,600'MD TO 9,800'MD -CIRCULATED HIGH VIS SWEEP WHILE ROTATING UP ABOVE THE LINER TOP ATTEMPTING TO CLEAR THE STRING OF DEBRIS. DISCUSSED PLAN FORWARD WITH RWO ENGINEER. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 48 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 05:30 3.00 CLEAN N DPRB OTHCMP PULL UP ABOVE THE 4-1/2"LINER -PUMP HIGH VIS SWEEP - 5 BPM=1880 PSI -SIM OPS:RAISE VIS IN THE ACTIVE MUD SYSTEM -OBSERVED-500PSI LOSS DURING CIRCULATION -VERIFY SURFACE EQUIPMENT TO BE OPERATING CORRECTLY -OBSERVE MUD TO BE AIRED UP DUE TO MIXING OPERATIONS -RIH TO 10,202', --220K PUW,150K SOW,177 K ROT,20 RPM =8K FREE TQ,40 RPM=9.5 FREE TQ,5 BPM =1210 PSI -CHECK TORQUE VALUES TO CONFIRM DEBRIS HAS BEEN DISLODGED 05:30 - 12:00 6.50 CLEAN N DPRB OTHCMP POOH FOR PRESSURE DROP AND POSSIBLE TOOL FAILURE -PJSM FOR POOH -STAND BACK 4"DP F/10,107'T/1,373' -MONITOR TRIP OUT ON TRIP TANK-WELL TAKING CORRECT HOLE FILL -RU 2-7/8"HANDLING EQUIPMENT,CHANGE OUT POWER TONGS,RU 2-7/8"BELLY ROPE, MU FOSV X-OVER MOBILIZE CASING TONGS 12:00 - 13:00 1.00 CLEAN N DPRB OTHCMP RIG SERVICE -SERVICE TOP DRIVE,DRAW WORKS,IRON ROUGHNECK -PJSM FOR BEAVER SLIDE OPS;PU CASING TONGS 13:00 - 17:00 4.00 CLEAN N DPRB OTHCMP CONT.POOH -CONT POOH F/1,373'STANDING BACK 12 STANDS 2-7/8"HT PAC IN DERRICK -LD 1 JOINT OF PAC AND 6 JOINTS OF 3-1/4" DRILL COLLARS -FINISH BREAKING DOWN BHA -NOTICED 4 SWELLED CONNECTIONS,HAD ISSUES BREAKING APART BHA DUE TO SWELLING -TOP SEAL ON JARS BLOWN OUT -3 DIAMOND CUTTERS BROKEN,DEEP GOUGE ON BIT NEAR STABILIZER -WAS NOTIFIED BY BAKER OIL TOOLS THAT THREE PIECES FROM THE LINER RUNNING TOOL WERE MISSING FROM THE TOOL WHEN IT WAS RETURNED TO BOT. 17:00 - 18:30 1.50 CLEAN N DPRB OTHCMP CLEAN&CLEAR RIG FLOOR OF UNNEEDED BOT BHA -MOBILIZE BHA#13-REVERSE CIRCULATING JUNK BASKET BHA -PJSM TO MOBILIZING BOT BHA#13 WITH NEW BUMPER SUBS AND JARS Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 49 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'i55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 21:30 3.00 CLEAN N DPRB OTHCMP MU REVERSE CIRCULATING JUNK BASKET BHA -PJSM FOR MU BHA#13 -USE DDI CASING TO MU SMALL TUBULARS WITH POWER TONGS -PU 7 JOINTS OF 2-7/8"PAC FROM SHED AND 12 STANDS FROM DERRICK AND MU PUMP OUT SUB AND XO BACK TO 4"DP -BHA OAL= 1,387.73'MD 21:30 - 00:00 2.50 CLEAN N DPRB OTHCMP RIH WITH REVERSE CIRCULATING JUNK BASKET BHA#13 -RIH WITH BHA#13 ON 4"DP FROM THE DERRICK F/1,387'TO 4,711'MD -PUW-107K,SOW-104K -BREAK CIRCULATION WITH FIRST STAND OF DP PICKED UP -3 BPM,370 PSI -4 BPM,600 PSI -5 BPM,920 PSI -6 BPM,1340 PSI -FILLING PIPE EVERY 20 STANDS -MONITOR TRIP ON THE TRIP TANK-WELL SHOWING CORRECT DISPLACEMENT 10/18/2015 00:00 - 04:00 4.00 CLEAN N DPRB OTHCMP RIH WITH REVERSE CIRCULATING JUNK BASKET BHA#13 -RIH WITH BHA#13 ON 4"DP FROM THE DERRICK F/1,387'TO 9,7411'MD -FILLING PIPE EVERY 20 STANDS -MONITOR TRIP ON THE TRIP TANK-WELL SHOWING CORRECT DISPLACEMENT D1 KICK WHILE TRIPPING DRILL WITH AAR 04:00 - 07:00 3.00 CLEAN N DPRB OTHCMP SLIP AND CUT -PJSM FOR SLIP AND CUT -SLIP AND CUT 68'OF DRILL LINE -INSPECTED SAVER SUB,PER MANUFACTURER RECOMMENDED PRACTICE -SERVICE TOP DRIVE/BLOCKS 07:00 - 10:00 3.00 CLEAN N DPRB OTHCMP RIH WITH REVERSE CIRCULATING JUNK BASKET BHA#13 -OBTAIN PARAMETERS AT 9,741 -PUW-220K,SOW-133K,ROT 166K 20 RPM, 8K FREE TO -3 BPM,460 PSI -4 BPM,780 PSI -5 BPM,1200 PSI -SPR'S -WASH DOWN FROM 9,741'MD TO 10,597' TAG HARD CEMENT -CIRCULATE 35 BBL STEEL LUBE PILL SURF TO SURF -DROP THE ACTIVATION BALL FOR THE REVERSE CIRCULATING JUNG BASKET -CIRCULATE ON BOTTOM WHILE WORKING THE(RCJB) Printed 11/11/2015 3:38:05PM North America-ALASKA-BP Page 50 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 18:00 8.00 CLEAN N DPRB OTHCMP POOH WITH REVERSE CIRCULATING JUNK BASKET BHA#13 -MONITOR WELL PRIOR TO PULLING OFF BOTTOM-WELL STATIC -POOH FROM 10,597'MD TO 28' -PJSM FOR POOH -STAND BACK 4"DP F/10,597'T/1,387' -RU 2-7/8"HANDLING EQUIPMENT,CHANGE OUT POWER TONGS,RU 2-7/8"BELLY ROPE, MU FOSV X-OVER -PULL OUT AND STAND BACK 2-7/8"PAC PIPE FROM 1,387'TO 28' -MONITOR TRIP OUT ON TRIP TANK-WELL TAKING CORRECT HOLE FILL 18:00 - 19:00 1.00 CLEAN N DPRB OTHCMP BREAK AND LD REVERSE CIRCULATING JUNK BASKET BHA#13 -RINS JUNK BASKET:RETRIEVE 1-FINGER FROM LINER RUN TOOL,6-BOLTS, SIGNIGANTAMOUT OF METAL SHAVINGS -CONFIRM WITH ANCHORAGE DRILLING ENGINEER ON PLAN FORWARD 19:00 - 19:30 0.50 CLEAN N DPRB OTHCMP CLEAN AND CLEAR RIG FLOOR -MOBILIZE BAKER OIL TOOL JUNK MILL BHA 19:30 - 21:30 2.00 CLEAN N DPRB OTHCMP MU 3.80"CONCAVED 3 BLADE JUNK MILL BHA #14 -PJSM FOR MU BHA#14 -USE DDI CASING TO MU SMALL TUBULARS WITH POWER TONGS -MILL,BIT SUB,(43)JNTS OF 2-7/8"PAC,XO, BUMPER SUB,HYD FISHING JARS,PUMP OUT SUB,XO -BHA OAL= 1,351.54'MD 21:30 - 00:00 2.50 CLEAN N DPRB OTHCMP RIH WITH CONCAVED 3 BLADE JUNK MILL BHA#14 ON 4"DP STAND F/1351'MD TO 7,078'MD -PU FIRST STAND AND BREAK CIRCULATION -2 BPM,320 PSI -3 BPM,670 PSI -4 BPM,1180 PSI CONT RIH TO 7,078'MD -FILLING PIPE EVERY 20 STANDS -MONITORING TRIP ON TRIP TANK- CORRECT DISPLACEMENT OBSERVED. -PUW-150K,SOW-110K 10/19/2015 00:00 - 03:00 3.00 CLEAN N DPRB OTHCMP CONT RIH F/7078' T/9813' -ESTABLISH PARAMETERS -PUW=205K SOW=140K ROT=165K 20 RPM=3-4K FREE TQ 40 RPM=3-4K FREE TQ -CIRC RATE 3 BPM=1020 PSI 4 BPM= 1500 PSI -CONT RIH F/9813' T/10305';ESTABLISH PARAMETERS -PUW=211K SOW=150K ROT=177K 20 RPM=3-5K FREE TQ 40 RPM=3-5K FREE TO -ESTABLISH SCR, #1 MUD PUMP 30 SPM= 800 PSI 40 SPM=1620 PSI -#2 MUD PUMP 30 SPM=890 PSI 40 SPM= 1550 PSI Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 51 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:OOAM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 07:00 4.00 CLEAN N DPRB OTHCMP WASH DOWN AND TAG CEMENT -WASH DOWN F/10305'T/10574';ESTABLISH PARAMETERS PUW=215K SOW=150K ROT=177K 20 RPM=3-5K FREE TQ -TAG CEMENT AT 10595'W/5K DOWN -CIRC STEEL LUBE PILL SURFACE TO SURFACE -50 RPM=6K TQ ON BOTTOM 40 BPM= 1560,1-2K WOB -MUD WEIGHT 8.4 PPG SEA WATER IN/OUT 07:00 - 09:00 2.00 CLEAN N DPRB OTHCMP CIRCULATE HI VIS SWEEP -CIRC HI VIS SWEEP SURF TO SURF WHILE WORKING PIPE -DROP PUMP OUT SUB DAR -POS OPEN AT 2200 PSI,3 BPM=220 PSI,4 BPM=300 PSI, 5 BPM=540 PSI -MONITOR WELL FOR 10 MIN—WELL STABLE -BLOW DOWN TOP DRIVE 09:00 - 14:00 5.00 CLEAN N DPRB OTHCMP POOH WITH JUNK MILL BHA RACKING BACK -PJSM FOR POOH -POOH F/10629'T/1,379 -LD BUMPER SUBS AND JARS -PUW 105K SOW 95K -MONITOR TRIP ON THE TRIP TANK-HOLE TAKING CORRECT HOLE FILL 14:00 - 15:30 1.50 CLEAN N DPRB OTHCMP STANDING BACK SMALL TUBULARS FROM 1379'TO SURFACE -PJSM FOR STANDING BACK SMALL TUBULARS -POOH STANDING BACK 2-7/8"DRILL PIPE IN THE DERRICK -BREAK APART MILL BIT SUB AND LD SINGLE JOINT -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT HOLE FILL 15:30 - 16:30 1.00 WHSUR N DPRB OTHCMP PULL WEAR RING -PJSM FOR PULLING WEAR RING -DRAIN STACK,PULL WR- -RIG UP TEST EQUIPMENT Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 52 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 23:00 6.50 BOPSUR N DPRB OTHCMP BOPE TEST -PJSM FOR BOPE TESTING -FILL STACK/PURGE KILL LINE WITH H2O -WELL CONTROL DRILL -LINE UP AND FILL GAS BUSTER—60 STROKES TO FILL MGS -CONT TO PURGE CHOKE MANIFOLD WITH H2O -ATTEMPT SHELL TEST ON BOPE-LEAK IDENTIFIED AT IA VALVE-RUN IN 4EA LOCK DOWN SCREWS— REATTEMPT TEST -RUN IN ALL LDS,PRESSURE UP—FAILED TEST—LEAK FROM IA VALVE -OPEN BAG,PULL TEST PLUG TO RIG FLOOR -DRAIN STACK,FLUSH AROUND TEST PLUG SEATING -NOTIFICATIONS MADE TO CAMERON TO GET NEW TEST PLUG/SEAL- -INSTALL NEW TEST PLUG RUN IN ALL THE LOCK DOWN SCREWS,FILL STACK WITH WATER AND PERFORM SHELL TEST TO 3500 PSI, -PRESSURE HOLDING SIM OPS:COMPLETE DERRICK INSP 23:00 - 00:00 1.00 BOPSUR N DPRB OTHCMP BOPE TEST-TEST 13-5/8 5K BOPE -AOGCC GIVEN NOTIFICATION OF BOPE TEST 10-18-2015 AT 11:30 HRS. AOGCC INSPECTOR JEFF JONES WAIVE WITNESS 10-18-2015 AT 19:00 HRS PRESSURE TEST ALL BOPE AS PER AOGCC REGS, SUNDRY#195-087,AND BP PRACTICE 100218. TEST ALL BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN. -TEST WITH 2-7/8",4"&4-1/2"TEST JOINTS -TEST ANNULAR WITH 2 7/8"TEST JOINT -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST PRIOR TO SHELL TEST. Printed 11/11/2015 3:38:05PM I North America-ALASKA-BP Page 53 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ustt) 10/20/2015 00:00 - 05:30 5.50 BOPSUR N DPRB OTHCMP BOPE TEST-TEST 13-5/8 5K BOPE -AOGCC GIVEN NOTIFICATION OF BOPE TEST 10-18-2015 AT 11:30 HRS AOGCC INSPECTOR JEFF JONES WAIVE WITNESS 10-18-2015 AT 19:00 HRS PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#195-087,AND BP PRACTICE 100218. -TEST ALL BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN. -TEST WITH 2-7/8",4"&4-1/2"TEST JOINTS -TEST ANNULAR WITH 2 7/8"TEST JOINT -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. 05:30 - 07:30 2.00 BOPSUR N DPRB OTHCMP RD TEST EQUIPMENT AND PULL TEST PLUG -RD TEST EQUIPMENT, BLOW DOWN CHOKE /KILL LINES -MONITOR WELL-WELL IS STATIC -PULL TEST PLUG,PUMP OUT STACK -INSTALL 12-1/4"WEAR BUSHING -MU SAFETY JOINT,FOSV XO -RU POWER TONGS -INSTALL 2-7/8"ELEVATORS—VERIFIED BY LEAD FLOORHAND AND DRILLER 07:30 - 12:00 4.50 CLEAN N DPRB OTHCMP MU DRILL OUT BHAAND RIH -PJSM WITH BAKER REP -RIH WITH 2-7/8"HT PAC T/1357' -PU JAR ASSY -ESTABLISH CIRC RATE,2 BPM=170 PSI,3 BPM=320 PSI,4 BPM=470 PSI,5 BPM=700 PSI,6 BPM=930 PSI -CONT RIH WITH DRILL PIPE R/1380'T/ 6034',PUW=135K SOW=110K 12:00 - 16:00 4.00 CLEAN N DPRB OTHCMP CONT RIH -CONT RIH F/6034 T/9735'FROM DERRICK ON ELEVATORS -OBTAIN PARAMETERS PUW=165K SOW= 145K ROT=192K FREE TQ=3-4K©40 RPM -BOTTOMS UP AT 9800'MD;2 BPM= 250 PSI 3 BPM=450 PSI 4 BPM=680 PSI 5 BPM= 960 PSI -RIH THRU LINER TOP T/9813'MD -CONT RIH ON ELEVATORS TO 10589' -MU TOP DRIVE,OBTAIN PARAMETERS -4 BPM=560 PSI 5 BPM=1140 PSI PUW= 197K SOW=160K ROT=175K FREE TQ=70 RPM AT 2-4K -PUMP 30 BBLW STEEL LUBE PILL SWEEP Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 54 of 69 Operation Summary Report Common Well Name:11-22 AFE No • Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud DaterTime:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 22:00 6.00 CLEAN P OTHCMP DRILLING CEMENT -WASH DOWN TO TOC AT 10362'AND DRILL AHEAD WITH 2K WOB,2-5K TORQUE AT 70 RPM,5 BPM=1170 PSI -PUMP HI VIS SWEEP AT 10684'MD -CONT DRILLING CEMENT T/10785' -PER WSL,POOH F/10785'T/10399'DUE TO HIGH TORQUE OF 9K,AND TO WAIT ON HI VIS LUBED SEA WATER -PUW=225K SOW=150K ROT 175K FREE TQ=8K -PER WSL,POOH TO LINER TOP DUE TO HIGH TQ;POOH F/10399'T/9800'MD • -SHORT TRIP TO LINER TOP AT 9813';FREE OF OBSTRUCTIONS DURING TRIP OUT 22:00 - 23:00 1.00 CLEAN P OTHCMP CIRCULATE HOLE CLEAN AT LINER TOP -5 BPM=950 PS FREETQAT7.5K 23:00 - 00:00 1.00 CLEAN P OTHCMP RUN IN THE HOLE F/9800'T/10000' -CIRC 80 BBL VIS-SEAWATER WITH SAFE LUBE WHILE RUNNING IN -PUW=210K SOW=147K;5 BPM 960 PSI 10/21/2015 00:00 - 01:30 1.50 CLEAN P OTHCMP RUN IN THE HOLE FROM 10,000'MD TO 10,684'MD AND ESTABLISH PARAMETERS WASH DOWN IN 4"LINER FROM 10,684'MD TO 10,815'MD -PU 215K;SO 145K;ROT 175K;50 RPM;8K TORQUE -5 BPM;1120 PSI -CIRCULATE 30 BBL STEEL LUBE 01:30 - 03:00 1.50 CLEAN P OTHCMP CONTINUE TO DRILL CEMENT FROM 10,815' MD TO 10,829'MD -PU 225K;SO 145K;ROT 176K;60 RPM;9-10K TORQUE -5 BPM;1130 PSI -SPR:10,829'MD;MW IN/OUT 8.5 PPG -MP#1:30/40 SPM;600/870 PSI -MP#2:30/40 SPM;520/800 PSI Printed 11/11/2015 3:38:05PM 41) North America-ALASKA-BP Page 55 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 18:30 15.50 CLEAN P OTHCMP DRILL PLUG AND LANDING COLLAR FROM 10,829'MD TO 10,831'MD -TAG PLUG ON LANDING COLLAR AT 10,829' MD -PU 225K;SO 145K;ROT 176K;70 RPM;9-11K TORQUE,3-4K WOB -5 BPM;1160 PSI -8.5 PPG SEAWATER/BRINE IN/OUT -HAVING DIFFICULTY MANAGING TORQUE OBSERVED AT SURFACE -CIRCULATE 30 BBL STEEL LUBE(3X) -MODERATE REDUCTION IN TORQUE NOTED WITH SWEEPS -CIRCULATE 30 BBL HIGH-VIS PILL; -MODERATE INCREASE IN RETURNS AT SHAKERS -RUBBER AND ALUMINUM OBSERVED OVER SHAKERS ADDED 290 BBLS OF POWER VIS ADDED TO ACTIVE.OBSERVED SIGNIFICANT REDUCTION IN TORQUE&CONTINUE DRILLING ON THE PLUG WITH NO PROGRESS PU 225K;SO 145K;ROT 176K;70 RPM;5-6K TORQUE,3-4K WOB -5 BPM;1160 PSI -8.5 PPG BRINE,WITH POWER VIS IN/OUT PLAN FORWARD DISCUSSED WITH ANCHORAGE ODE&ETL.-DECISION MADE TO SWAP THE WELL TO CLEAN SEAWATER& PULL OUT OF THE HOLE 18:30 - 23:00 4.50 CLEAN P OTHCMP MAKE PREPARATIONS TO SWAP WELL OVER TO CLEAN SEAWATER -ATTEMPT TO MILL PLUG WHILE WAITING ON VAC TRUCKS TO PERFORM THE SEAWATER SWAP -PU 225K;SO 145K;ROT 176K;70 RPM;5-6K TORQUE,3-4K WOB -5 BPM;1140 PSI,STILL NO PROGRESS MADE -PICK UP OFF BOTTOM AND CIRCULATE -CLEAN PITS FOR NEW SEAWATER AND EMPTY PITS FOR DISPLACEMENT OF WELL TO 8.5 PPG SEAWATER 23:00 - 00:00 1.00 CLEAN P OTHCMP DISPLACE WELL WITH 8.5PPG SEAWATER -PJSM FOR DISPLACEMENT OF WELL -REVIEW DDI PROCEDURE FOR FLUIDS MANAGEMENT,DISCUSS BBL FOR BBL COUNT, -START DISPLACEMENT WITH 8.5 PPG SEAWATER AT 10826' -5 BPM 1350 PSI,PUW=210K SOW=150K Printed 11/11/2015 3:38:05PM North America-ALASKA-BP Page 56 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/22/2015 00:00 - 01:00 1.00 DISPL P OTHCMP DISPLACE WELL WITH 8.5PPG SEAWATER -PJSM FOR DISPLACEMENT OF WELL -REVIEW DDI PROCEDURE FOR FLUIDS MANAGEMENT,DISCUSS BBL FOR BBL COUNT -START DISPLACEMENT WITH 8.5 PPG SEAWATER AT 10826' -5 BPM 1350 PSI,PUW=210K SOW=150K -8.5 PPG CLEAN SEAWATER IN/OUT.TOTAL OF 370 BBLS PUMPED -SPR:10,829'MD;MW IN/OUT 8.5 PPG -MP#1:30/40 SPM;600/870 PSI -MP#2:30/40 SPM;520/800 PSI 01:00 - 05:00 4.00 CLEAN P OTHCMP POOH WITH 3.75"PDC BHA#15 -POOH LAYING DOWN SINGLES MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM.-WELL STATIC -POOH FROM 10,826'TO 9,255'MD ABOVE THE 4-1/2"SCAB LINER -PUW-235K,SOW 155K,PUMP DOWN THE DART FOR THE PUMP OUT SUB -2 BPM,150 PSI,7%FO -TRIP 4 STANDS BACK IN THE HOLE OUT OF THE DERRICK FROM 9,255'MD TO 9,640' (D1)KICK WHILE TRIPPING. -AAR:DRILL SENARIO-TRIP SHEET HOLE FILL NOT CORRECT.REMOTE PANEL FAILURE: -DRILL CREW ACTED ACCORDINGLY AND SHUT THE WELL IN ACCORDANCE WITH BP'S STANDING ORDERS TO THE DRILLER. 05:00 - 07:00 2.00 CLEAN P OTHCMP SLIP AND CUT DRILLING LINE;INSPECT SAVER SUB -PJSM FOR REVIEW OF DDI PROCEDURE. -SLIP&CUT-49'OF DRILLING LINE -INSPECT SAVER SUB PER MANUFACTURER RECOMMENDATIONS; -WILL CHANGE OUT SAVER SUB DURING RIG MOVE 07:00 - 12:00 5.00 CLEAN P OTHCMP CONTINUE TO POOH WITH 3.75"PDC BHA #15,LD DP TO PIPE SHED -F/9608'MD T/3089 MD -PUW=90K SOW=87K -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT HOLE FILL 12:00 - 12:30 0.50 CLEAN P OTHCMP RIG SERVICE -SERVICE TOP DRIVE,DRAWWORKS,AND PIPE SKATE,AND IRON ROUGHNECK 12:30 - 14:30 2.00 CLEAN P OTHCMP CONT POOH AND LD SMALL TUBULAR S AND BHA -POOH F/3089' T/1380'MD -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT HOLE FILL -PJSM W/DDI CASING AND BAKER REPS ON LD BHA -MU FOSV FOR 2-7/8"PAC Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 57 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 16:00 1.50 CLEAN N WAIT OTHCMP REMOVE ICE FROM DERRICK -PJSM FOR REMOVING ICE -CLEARED RIG FLOOR,TAPED OFF AREAS, SIGNS POSTED 16:00 - 10:00 2.00 CLEAN P OTHCMP CONT POOH -PJSM FOR POOH -POOH AND LD DP TO PIPE SHED F/1389' -LD BHA PER BAKER REP DIRECTION -BIT WAS DAMAGED BEYOND REPAIR(DBR) 18:00 - 21:30 3.50 CLEAN P OTHCMP CLEAN&CLEAR RIG FLOOR -PJSM -CLEAR RIG FLOOR OF BAKER BHAAND X OVERS -MU STACK WASHER AND FLUSH STACK,7 BPM WORK STACK WASHER 25'UP AND DOWN THROUGH STACK -DRAIN STACK AND INSPECT FOR ANY DEBRIS IN RAM CAVITIES—ALL CHECKED GOOD -RU DDI CASING TONGS FOR TORQUE TURN SERVICES -RU 4-1/2"CASING ELEVATORS-DRILLER AND LEAD FLOOR HAND VERIFIED CORRECT SIZE 21:30 - 00:00 2.50 RUNCOM P RUNCMP RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION TO 461' -PJSM WITH DDI CREWS,HES REP,DDI CASING -REVIEW HAZARDS AND PROCEDURE -BAKER-LOC ALL CONNECTIONS BELOW THE PACKER -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED -WSL VERIFY CORRECT SHEAR BOLTS FOR TNT PACKER SETTING. D1 KICK WHILE TRIPPING DRILL WITH AAR 10/23/2015 00:00 - 12:00 12.00 RUNCOM P RUNCMP CONT.RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION -F/461'MDT/8604 -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED -25'/MIN W/JEWELRY GOING THRU 7"LINER LAP AT 7975' -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED. 12:00 - 14:00 2.00 RUNCOM P RUNCMP CONT RIH WITH 4 1/2"12.6#,13 CR85 VAMTOP COMPLETION -RIH W/COMPLETION F/8604'T/9722' -PUW=175K SOW=1255K -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 58 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 16:00 2.00 RUNCOM P RUNCMP CONT RIH WITH 4 1/2"12.6#,13 CR85 VAMTOP COMPLETION AND TAG NO GO PERFORM SPACE OUT AND LAND 4-1/2",12.6#, VAMTOP COMPLETION: (GRAY 12"X 4.5"TCII TOP AND BTM). -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -RUN IN HOLE ON 4"DP LANDING JOINT CROSSED OVER AND LAND TUBING HANGER -CAMERON REPS RUN IN LOCKDOWN SCREWS—TORQUED TO 450 FT/ LBS -FINAL PUW=180K,SOW=125 K -HES TNT PACKER AT 9,722'MD. -'X'NIPPLE AT 9,759'MD HAS RHC-M PLUG INSTALLED. -NOTE:ALL CONNECTIONS BELOW PACKER ARE BAKER-LOK'D. SIM OPS-RIG UP FOR REVERSE _CIRCULATING CORRISION INHIBITOR 16:00 - 19:30 3.50 RUNCOM P RUNCMP PUMPING CORROSION INHIBITED SEAWATER LINE UP AND REVERSE CIRCULATE 212 BBLS OF CORROSION INHITBITED SEAWATER DOWN IA TAKING RETURNS UP THE TUBING PJSM FOR REVERSE CIRCULATION:REVIEW DDI PROCEDURE AND VERIFY CORRECT LINE UP - PUMPED 3 BPM-430 PSI FOR 212 BBLS; PUMPED AN ADDITIONAL 10 BBLS TO FLUSH LINES OF CORROSION INHIBITOR -SHUT DOWN,PUMPED 5 BBLS DOWN THE TUBING TO CLEAR SEAT OF ANY DEBRIS Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 59 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe BaySite:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/me:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 00:00 4.50 RUNCOM P RUNCMP SET/TEST TUBING AND PACKER -PJSM FOR SETTING AND TESTING PACKER -RU LANDING JT AND DROP BALL AND ROD AT 20:07 HRS;RD LANDING JOINT AND RU FOR TESTING PRESSURE TEST THE TUBING: -PRESSURE UP FOR LOW TEST-250 PSI LOW,-GOOD TEST, -HIGH PRESSURE TEST TO 3650 PSI,2.3 BBLS TO GET PRESSURE(2.0)BBLS CALCULATED.-GOOD TEST-PASSED BP MIT PRESSURE TEST CRITERIA PRESSURE TEST THE IA: -PRESSURE UP FOR 250 PSI LOW-5 MIN.- GOOD TEST -PRESSURE UP FOR 30 MIN HIGH PRESSURE TEST PRESSURE UP TO 3700 PSI,3.4 BBLS TO GET PRESSURE,(2.4)BBLS CALCULATED -LOST 200 PSI IN THE FIRST 15 MIN.WITH NO STABILIZATION FOR THE REMAINDER OF THE TEST. -VERIFY SURFACE EQUIPMENT TO BE LEAK TIGHT. -RE-TEST FOR HIGH TO 3700 PSI.-SAME RESULTS AS ABOVE 10/24/2015 00:00 - 03:00 3.00 RUNCOM P ( RUNCMP PRESSURE TESTING THE IA -BLEED PRESSURE COMPLETELY OFF AND ISOLATE SURFACE EQUIPMENT TO ENSURE NOT THE CAUSE OF PRESSURE LOSS -PRESSURE BACK UP TO 3700 PSI,32 STKS (3.2 BBLS),2.3 BBLS CALCULATED CHECK SURFACE FOR LEAKS -LOST 200 PSI IN THE FIRST 15 MIN,WITH NO STABILIZATION AFTER -MADE ATTEMPT TO PRESSURE BACK UP TO HELP COMPRESS FLUID WITH NO SUCCESS NOTIFIED ANCHORAGE(ODE)AND FIELD SUPERINTENDENT OF SITUATION AND DISCUSSED PLAN FORWARD. 03:00 - 03:30 0.50 RUNCOM P RUNCMP SHEAR DCK VALVE -PJSM WITH HES REP -BLEED OFF TUBING PRESSURE TO SHEAR VALVE PER HES AND WSL -CIRCULATE DOWN TBG TAKING RETURNS UP IA,CIRC 5 BBLS AT 1 BPM =220 PSI CIRCULATE DOWN IA TAKING RETURNS UP TBG,CIRC 5 BBLS AT 1 BPM=210 PSI - 8.5 PPG SEAWATER IN/OUT Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 60 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 04:30 1.00 RUNCOM P RUNCMP TUBING/IA COMBO PRESSURE TEST -PJSM FOR CMIT-REVIEW DDI PROCEDURE- VERIFY CORRECT LINE UP -LINED UP FOR PRESSURE TESTING BOTH TUBING AND IA -PRESSURE TEST 250 PSI FOR 5 MIN,5 STKS (.5 BBLS),-GOOD TEST PRESSURE UP TO 3700 PSI FOR 30 MIN,50 STKS(5 BBLS),4.2 BBLS CALCULATED- LOST 200 PSI IN THE FIRST 15 MIN.WITH NO STABILIZATION IN THE SECOND 15 MIN- FAILED TEST -NOTIFIED ODE FOR PLAN FORWARD DISCUSSION. 04:30 - 14:00 9.50 RUNCOM N DPRB RUNCMP DISCUSS PRESSURE TEST RESULTS AND DEVELOP PLAN FORWARD WITH ODE,FIELD SUPERINTENDENT,AND ANCHORAGE LEADERSHIP -DISCUSS WITH WELLS GROUP AND LOCATE E-LINE UNIT FOR TUBING CUT -WAIT FOR HALLIBURTON E-LINE UNIT TO ARRIVE ON LOCATION -CALL OUT HARDLINE CREW TO RUN AND PT HARDLINE TO FLOWBACK TANK FOR CIRC. OUT -PT TO 300 PSI LOW,4250 PSI HIGH SIMOPS: -CHANGE OUT LIGHTS IN DERRICK -CONDUCT PREVENTATIVE MAINTENANCE ON RIG EQUIPMENT -GENERAL HOUSKEEPING AND PAINTING -WORK ON AUGER IN PITS -CHANGE OUT HYDRAULIC HOSES FOR MOVING EQUIPMENT 14:00 - 18:00 4.00 RUNCOM N DPRB RUNCMP RIG UP HALLIBURTON E-LINE TO PUNCH AND CUT TUBING -PJSM WITH RIG CREW AND HALLIBURTON E-LINE CREW -SPOT E-LINE UNIT -MOBILIZE SHEAVES AND EQUIPMENT TO RIG FLOOR -RIG UP E-LINE SHEAVES -RIH WITH TUBING PUNCH 1ST TRIP -WIRE LINE SHOT DEPTH AT 9640-9642' ELMD -WIRE LINE POOH SIMOPS -CLEAN UP PIPE SKATE CHUTE -STRAP AND TALLY 4"DRILL PIPE -CLEAN UP HOPPER ROOM -CONT CLEANING MUD PITS AUGER AREA, GENERAL HOUSEKEEPING Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 61 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 23:00 5.00 RUNCOM N DPRB RUNCMP MU E LINE RADIAL CUTTING TORCH -PJSM WITH HES E LINE&DDI,REVIEW PROCEDRUE AND WELL CONTROL RISKS AND MITIGATIONS W/E LINE IN THE HOLE. -RIH WITH RTC/CCL TO 9653'MD, CORRELATE DEPTH TO COMPLETION TALLY -ATTEMPT TO SET TOOL ON DEPTH FOR CUT AT 9653'MD -WIRE LINE TOOL FAILURE—POOH WITH WIRE LINE,ELECTRICAL MECHANICAL ARMS FAILED TO OPEN -POOH FOR FAILED ELECTRO MECHANICAL ARM(EMA) SIMOPS -CONT CLEANING OF RIG -WORKING ON DRILL PIPE 23:00 - 00:00 1.00 RUNCOM N DPRB RUNCMP POOH WITH RCT ON E-LINE -PJSM FOR LAYING DOWN RCT -LD RCT TOOL AS DIRECTED BY -TROUBLE SHOOTING ASSY; ELECTRO MECHANICAL ARM(EMA) -CHANGED OUT EMAAND RIH WITH NEW RADIAL CUTTING TORCH ASSY 10/25/2015 00:00 - 01:00 1.00 CLEAN N DFAL OTHCMP CONT RIH WITH ELINE -RIH WITH HES WIRE LINE RADIAL CUTTING TORCH - WSL VERIFY CORRECT CUT DEPTH TO CORROLATION RUN. -ON DEPTH AT 9652',SET MECHANICAL ARMS&FIRED RCT CUT -TUBING CUT DEPTH:9,652'MD 01:00 - 02:30 1.50 CLEAN N DFAL OTHCMP POOH WITH E LINE HES RADIAL CUTTING TORCH FROM 9,652'TO SURFACE. -POOH WITH RCT;100'/MIN -PJSM WITH DDI AND HES FOR RIGGING DOWN E LINE EQUIPMENT. -RD HES E LINE TOOLS/SHEAVES -KEEP HES E LINE ON LOCATION UNTIL TUBING IS PULLED FREE 02:30 - 03:30 1.00 CLEAN N DFAL OTHCMP CIRC CORROSION INHIBITOR OUT OF WELL WITH 8.5 PPG SEAWATER -PJSM FOR CIRC OUT:REVIEW DDI PROCEDURE,VERIFY CORRECT LINE UP FOR CIRCULATION. -CIRCULATE CORROSION INHIBITOR OUT OF WELL TO FLOW BACK TANK -7-8 BPM,1000-1280 PSI -MONITOR WELL 10 MIN-WELL STATIC. 03:30 - 06:30 3.00 PULL N DFAL OTHCMP PULL HANGER AND 4.5"VT COMPLETION TUBING -BLOW DOWN CIRCULATION LINES -SUCK OUT THE STACK -PU&MU LANDING JOINT CROSSED OVER TO TCII RIH AND ENGAGE TUBING HANGER WITH 8 FULL TURNS -CAMERON REP BACK OUT LOCK DOWN SCREWS. -HANGER PULLED FREE WITH 170K PUW 06:30 - 07:00 0.50 PULL N DFAL OTHCMP RIG DOWN HALLIBURTON -PJSM FOR RIG DOWN OPERATIONS - LAY DOWN E LINE TOOLS TO THE GROUND Printed 11/11/2015 3:38:05PM i • North America-ALASKA-BP Page 62 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 10:30 3.50 PULL N DFAL OTHCMP PULL AND LAY DOWN 4-1/2"VT COMPLETION TUBING -PJSM FOR LAYING DOWN TUBING AND RIGGING UP CASING TOOLS. - BREAK AND LAY DOWN TUBING HANGER - RIG UP SAFETY JOINT WITH 4-1/2"LIFTING PUP ON TOP. -RU LONG BAILS FOR COMPENSATOR RUN -RU STABBING BOARD 10:30 - 12:00 1.50 PULL N DFAL OTHCMP PULL AND LAY DOWN 4-1/2"12.6# VT COMPLETION TUBING &GAS LIFT MANDRELS -POOH FROM CUT AT 9,652'MD TO 9,143'MD -LAYING DOWN TO THE PIPE SHED -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT DISPLACEMENT -INSPECTING THREADS AS JOINTS ARE PULLED. 12:00 - 12:30 0.50 PULL N DFAL OTHCMP RIG SERVICE -SERVICE TOP DRIVE AND LUBRICATE RIG 12:30 - 00:00 11.50 PULL N DFAL OTHCMP PULL AND LAY DOWN 4-1/2"12.6# VT COMPLETION TUBING&GAS LIFT MANDRELS -POOH FROM CUT FROM 9,143'MD TO 1,207' MD -LAYING DOWN TO THE PIPE SHED -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT DISPLACEMENT -INSPECTING THREADS AS JOINTS ARE PULLED. KICK WHILE TRIPPING(D1)WITH AAR: -TABLE TOP FIRE DRILL- 10/26/2015 00:00 - 02:00 2.00 PULL N DFAL OTHCMP CONT POOH WITH 4-1/2"12.6#13CR-85 VAM TOP TUBING -POOH F/1207' T/SURFACE -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT HOLE FILL. -CUT JOINT OAL=6.80'WITH NO FLARE ON CUT -NO DAMAGED THREADS OBSERVED WHILE PULLING OUT OF THE HOLE. 02:00 - 04:00 2.00 PULL N DFAL OTHCMP RIG DOWN CASING EQUIPMENT -PJSM FOR RIG DOWN. -RD STABBING BOARD,COMPENSATOR, LONG BAILS,LIFTING EYE SUB ON TOP DRIVE,POWER TONGS -PU/MU STACK WASHER RIH AND FLUSH STACK AND RETRIEVE MISSING HANGER SEAL AND LD -PUMPED 40 BBLS AT 10 BPM 50 PSI -MISSING SEAL RETRIEVED AT SHAKERS -450 GPM, J -SUCK OUT STACK 04:00 - 05:00 1.00 PULL N DFAL OTHCMP INSTALL WEAR BUSHING -PJSM FOR INSTALL WEAR RING -INSTALL WEAR RING-MEASURED AT 12-1/4" -BLOW DOWN TOP DRIVE Printed 11/11/2015 3:38:05PM North America-ALASKA-BP Page 63 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type: .- . .. , Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UVVI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To j Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 10:00 5.00 PULL N DFAL OTHCMP PICK&MAKE UP THE HALLIBURTON RTTS TOOL -PJSM WITH HES&DDI,REVIEW PROCEDURE FOR HANDLING TOOL -MAKE UP 6.00"RTTS AS DIRECTED BY HES REP -PU4"DPF/16' T/3338' DRILLER NOTICED TRIP VOLUME TO BE OFF WHEN HE STARTED IN THE HOLE PRIOR TO GETTING TO THE FIRST FIVE STANDS. -SHUT DOWN AND MONITORED THE WELL- WELL STATIC. D1 KICK WHILE TRIPPING DRILL,AAR WITH CREWAND DDI TOOLPUSHER 10:00 - 14:30 4.50 PULL N DFAL OTHCMP RIH WITH RTTS ON 4"DP FROM PIPE SHED -PU 4"DP F/3338' T/5932' -PUS=135K SOW=116K CONT RIH WITH RTTS ON 4"DP FROM PIPE SHED -RIH F/5932'TO 8111'MD -RIH ON ELEVATORS PU 4"DP SINGLES -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED -WOB GOING THRU 7'LINER TOP AT 7975' 14:30 - 16:00 1.50 PULL N WAIT OTHCMP INSPECT/CLEAR DERRICK FOR ICE -PJSM FOR INSP/CLEARING DERRICK FOR ICE -CLEAR RIG FLOOR,POST SIGNS, COMMUNICATE RED ZONES TO 3RD PARTY 16:00 - 18:00 2.00 PULL N DFAL OTHCMP CONT RIH WITH RTTS ON 4"DP FROM PIPE SHED -RIH ON ELEVATORS F/8,111'T/9,601' -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED 18:00 - 22:00 4.00 PULL N DFAL OTHCMP SETTING RTTS AND PRESSURE TEST -PJSM WITH HES REPS -OBTAIN PARAMETERS PUW=198K SOW= 150K -PU 1 EA 4"DP SINGLE AND RIH TO 9633'MD AND SET RTTS -3 TURNS TO THE RIGHT,SET DOWN 20K WOB -PRESSURE TEST THE IA250 PSI LOW FOR 5 MIN-GOOD TEST, 3500 PSI HIGH FOR 30 MIN-FAILED TEST -3 STKS(.3 BBLS)TO BUILD UP TO 250 PSI, 39 STKS(3.9 BBLS)TO BUILD UP TO 3700 PSI -HIGH PRESSURE TEST FAILED TO MEET PASSING CRITERIA -PUMPED 4 BBLS TO GET PRESSURE,BLED BACK 3.5 BBLS, LINE UP AND TEST BELOW RTTS -275 PSI LOW FOR 5 MIN-GOOD TEST /3720 PSI HIGH FOR 30 MINS-PASSING TEST -TOOK 3 STKS(.3 BBLS)TO BUILD TO 275 PSI, -TOOK 21 STKS(2.1 BBLS)TO BUILD UP TO 3720 PSI-BLED BACK 2 BBLS -CONTACTED ODE WITH RESULTS-CARRY ON WITH THE CURRENT PLAN FORWARD. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 64 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 PULL N DFAL OTHCMP POOH LAYING DOWN SINGLES TO THE PIPE SHED -MONITOR WELL PRIOR TO PULLING OFF BOTTOM 10 MIN-WELL STATIC. -POOH FROM 9,633'MD TO 7,830'MD -MONITORING TRIP ON TRIP TANK- CORRECT HOLE FILL OBSERVED. SET RTTS ON DEPTH WITH CENTER OF ELEMENT AT 7,821'MD -SET AS DIRECTED BY HALLIBURTON REP. 10/27/2015 00:00 - 01:00 1.00 PULL N DFAL OTHCMP PRESSURE TEST THE 7"CASING(MIT-IA)4"X 7"23#CASING -WITH RTTS AT 7,821MD -PT WITH 8.5 PPG SEAWATER AMBIENT TEMP -LINE UP AND PT TO 300 PSI LOW FOR 5 CHARTED MIN-GOOD TEST -TOOK 3 STROKES TO GET PRESSURE -PT TO 3500 PSI HIGH FOR 30 CHARTED MIN -3700 PSI START PRESSURE -15 IMN-3680 PSI,30 MIN-3680 PSI-FINAL -TOOK 3.4 BBLS TO GET PRESSURE (2.5BBLS)CALCULATED -LOST 20 PSI IN THE FIRST 15 MIN&0 PSI IN THE SECOND 15-PASSING TEST. -CONTACT ODE AND RWO-TEAM LEAD WITH TEST RESULTS-RECEIVE AUTHORIZATION TO PROCEED. 01:00 - 02:00 1.00 PULL N DFAL OTHCMP UN SET THE RTTS&GET READY TO PULL& LD DRILL PIPE. -PJSM FOR PULLING THE RTTS:WITH DDI AND HES REP -UNSEAT THE RTTS PER HES REP DIRECTION -MONITOR THE WELL 10 MIN-WELL STATIC -BLOW DOWN CHOKE AND KILL LINES 02:00 - 04:00 2.00 PULL N DFAL OTHCMP SLIP&CUT OPERATIONS -PJSM FOR SLIP&CUT.REVIEW DDI PROCEDURE AND DISCUSS OVERHEAD RISKS -SLIP&CUT 54'DRILLING LINE -MAKE DERRICK INSPECTION FOR SNOW& ICE HAZARDS. 04:00 - 09:00 5.00 PULL N DFAL OTHCMP POOH WITH RTTS ON 4"DP FROM 7,820'MD, LAYING DOWN SINGLES TO THE PIPE SHED -PJSM FOR LAYING DOWN -POOH WITH RTTS FROM 7,820'TO SURFACE 09:00 - 09:30 0.50 PULL N DFAL OTHCMP LAY DOWN RTTS TOOL -PJSM FOR HANDLING RTTS -BREAK OUT AND LAY DOWN RTTS AND RUNNING TOOL TO GROUND 09:30 - 10:00 0.50 WHSUR N DFAL OTHCMP PULL WEAR RING -PJSM ON PULLING WEAR RING -SUCK OUT STACK -MAKE UP WEAR BUSHING PULLING TOOL -BACK OUT LOCK DOWN SCREWS -PULL WEAR BUSHING Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 65 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.3ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 11:00 1.00 BOPSUR N DFAL OTHCMP RIG UP TO TEST BOP EQUIPMENT -PJSM -RIG UP BOP TEST EQUIPMENT -GREASE CHOKE MANIFOLD VALVES AND VALVES ON BOP STACK 11:00 - 15:30 4.50 BOPSUR N DFAL OTHCMP TROUBLESHOOT LEAK FROM IA -SET TEST PLUG IN PROFILE -PRESSURE UP AND SEAT TEST PLUG -RUN IN LOCK DOWN SCREWS -SHELL TEST TO 250 PSI LOW/3500 PSI HIGH -STEADY LEAK COMING FROM IA VALVE-SUSPECT LEAK ON TEST PLUG. -CALL FOR CAMERON TO COME OUT TO CHANGE SEALS ON TEST PLUG-CONTINUE TESTING SURFACE EQUIPMENT -SHUT IN TO TEST JOINT AND TEST IBOP, FOSVS 15:30 - 16:30 1.00 BOPSUR N DFAL OTHCMP CHANGE OUT SEALS ON TEST PLUG -PJSM WITH CAMERON ON PULLING AND SETTING TEST PLUG,CHANGING OUT SEALS -BACK OUT LOCK DOWN SCREWS -PULL TEST PLUG -CAMERON CHANGE OUT SEALS ON TEST PLUG -SET TEST PLUG IN PROFILE -PRESSURE UP TO SEAT TEST PLUG -RUN IN LOCK DOWN SCREWS 16:30 - 17:30 1.00 BOPSUR N DFAL OTHCMP CONTINUE TO TEST FOSV AND MANUAL IBOP WHILE MONITORING IA FLUID RETURNS. 17:30 - 18:30 1.00 BOPSUR N DFAL OTHCMP TROUBLESHOOT IA RETURNS -BLEED OFF TEST PRESSURE ON BOP STACK -PULL TEST PLUG -EVACUATE FLUID FROM BOP STACK -IA RETURNS SLOWING DOWN -INSPECT BOP TEST PLUG SEALS -RUN TEST PLUG IN AND SET IN PROFILE -PRESSURE UP ON BOP STACK TO SEAT TEST PLUG -RUN IN LOCK DOWN SCREWS -MONITORING RETURN RATE FROM IA(RATE DECREASING).WILL CONTINUE TO MONITOR WHILE TESTING BOPE 18:30 - 00:00 5.50 BOPSUR N DFAL OTHCMP BOPE TEST-TEST 13-5/8 5K BOPE -AOGCC GIVEN NOTIFICATION OF BOPE TEST 10-26-2015 AT 06:53 HRS. AOGCC INSPECTOR JOHNNIE HILL WAIVE WITNESS 10-27-2015 AT 06:56 HRS PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#195-087,AND BP PRACTICE 100218. -TEST ALL BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN. -TEST WITH 4"&4-1/2"TEST JOINTS -TEST ANNULAR WITH 4"TEST JOINT -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. 10/28/2015 00:00 - 01:00 1.00 BOPSUR P OTHCMP RIG DOWN FROM BOP TESTING -PJSM -BACK OUT LOCK DOWN SCREWS -PULL TEST PLUG -RIG DOWN BOP TESTING EQUIPMENT -BLOW DOWN CHOKE AND KILL LINES Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 66 of 69 Operation Summary Report Common Well Name:11-22 AFE No • Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.3ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 04:00 3.00 RUNCOM P RUNCMP RIG UP 4-1/2"HANDLING EQUIPMENT -PJSM -MAKE UP SAFETY JOINT -MAKE UP FOSV WITH VAMTOP CROSSOVER -LAY DOWN 4-1.2"POWER TONGS -PICK UP 5-1/2"POWER TONGS -RIG UP TORQUE-N-TURN EQUIPMENT 04:00 - 12:00 8.00 RUNCOM P RUNCMP RUN 4.5"COMPLETION -PJSM -RUN 4.5"UNIQUE OVERSHOT FOLLOWED BY 4.5"COMPLETION STRING -REMOVE COLLARS FROM FIRST 43 JOINTS (BELOW PACKER),CLEAN THREADS AND BAKER LOCK ALL CONNECTIONS BELOW PACKER -RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION -F/SURFACE T/1,850 -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL SEALING AREAS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED. -CHANGED OUT ONE BAD JOINT WITH A SPARE JOINT(SAME MEASUREMENTS) 12:00 - 12:30 0.50 RUNCOM P RUNCMP RIG SERVICE 12:30 - 13:00 0.50 RUNCOM P RUNCMP RUN 4.5"COMPLETION -PJSM -RUN TNT PACKER IN COMPLETION STRING WITH X-NIPPLES ON EITHER SIDE OF PACKER 13:00 - 14:00 1.00 RUNCOM P RUNCMP SWAP POWER TONGS -PJSM -RIG DOWN 5.5"POWER TONGS AND SEND TO GROUND -PICK UP AND RIG UP4.5"POWER TONGS 14:00 - 00:00 10.00 RUNCOM P RUNCMP CONT.RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION -Fl 1,952'MD T/7,944'MD -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED. 10/29/2015 00:00 - 00:30 0.50 RUNCOM P RUNCMP CONT.RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION -F/7,944'MD T/8'195 MD -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED. Printed 11/11/2015 3:38:05PM • • North America-ALASKA-BP Page 67 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011 M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 01:00 0.50 RUNCOM P RUNCMP HELD KICK WHILE TRIPPING DRILL -WELL SECURED FROM INITIAL SIGNS(5 MIN, 15 SEC) -AAR HELD WITH RIG CREW,WSL AND TOURPUSHER 01:00 - 04:00 3.00 RUNCOM P RUNCMP CONT.RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION -F/8,195'MDT/9668'MD -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED. -CHANGED OUT A BAD JOINT FOR A SPARE JOINT.(SAME MEASUREMENTS) GET PUW(165K)AND SOW(127)BEFORE ENGAGING STUMP. -ENGAGED STUMP AT 9654'WITH 3K UNDER -SHEAR 1ST SET OF PINS AT 9658'W/8K DOWN,SHEAR 2ND SET OF PINS AT 9666' WITH 6K DOWN -NO-GO AT 9668' 04:00 - 04:30 0.50 RUNCOM P RUNCMP LAY DOWN LAST 3 JOINTS RAN TO PLACE SPACE OUT PUPS IN. -PICK UP 19.74'AND 4.00'PUPS TO RUN. -RUN JOINT#225 BACK IN 04:30 - 05:30 1.00 RUNCOM P RUNCMP RIG UP TO LAND HANGER WITH LANDING JOINT -RIG DOWN 4.5"ELEVATORS AND SAFETY JOINT. -CHANGE OUT ELEVATORS TO 4"DP ELEVATORS 05:30 - 06:30 1.00 RUNCOM P RUNCMP LAND HANGER -PJSM -MAKE UP AND LAND HANGER WITH CAMERON -RUN IN LOCK DOWN SCREWS AND TORQUED SCREWS TO 500 FT-LBS, TORQUED GLAND NUTS TO 450 FT-LBS -FINAL PUW 167K,FINAL SOW 127K WITH 52K BLOCK WEIGHT 06:30 - 07:30 1.00 RUNCOM P RUNCMP CIRCULATE 150 BBLS OF CORROSION INHIBITED WATER DOWN IA,TAKING RETURNS UP TUBING. 07:30 - 08:00 0.50 RUNCOM P RUNCMP CIRCULATE 5 BBLS DOWN TUBING TO CLEAN BALL SEAT PROFILE.TAKE RETURNS UP IA. Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 68 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292203500 Active datum:11-22A KBE 55.3'@55.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 10:00 2.00 RUNCOM P RUNCMP MIT ON TUBING AND IA -PJSM -DROP BALL AND ROD WITNESSED BY HES, WSL AND DDI TOOLPUSHER -RIG UP LINES TO MIT TUBING -PRESSURE TEST TUBING TO 250 PSI(.3 BBLS)FOR 5 MINUTES -PRESSURE UP TO 3500 PSI(2.1 BBLS). PACKER SET OBSERVED ON CHARTS AT 2200 PSI.HELD PRESSURE FOR 30 MINUTES-GOOD TEST -BLEED DOWN TUBING PRESSURE TO 2000 PSI TO TEST IA AND PACKER. -PRESSURE UP IA FOR MIT TO 250 PSI LOW (5 MINUTES/.3 BBLS)THEN TO 3500 PSI HIGH (30 MINUTES/2.6 BBLS)-GOOD TEST. -CALL WTL FOR APPROVAL BEFORE PROCEEDING FORWARD WITH PLAN-APPROVAL GIVEN BY R.BURNETT 10:00 - 11:30 1.50 RUNCOM P RUNCMP SHEAR DCK VALVE -BLEED DOWN TUBING.INDICATION OF VALVE SHEARING BY IA BLEEDING DOWN TO 0 PSI AS WELL. -CIRCULATE 5 BBLS DOWN TUBING BACK UP THRU IA -REVERSE CIRCULATE 5 BBLS DOWN IA, BACK UP THRU TUBING -CLEAR PATH FOR CIRCULATION ESTABLISHED 11:30 - 13:00 1.50 WHSUB P RUNCMP RIG UP LINES TO CIRCULATE FREEZE PROTECTION DOWN WELL. -LITTLE RED SERVICES PRESSURE TESTED LINES TO 250/3500 PSI FOR 5 MINUTES EACH-GOOD TEST 13:00 - 15:00 2.00 WHSUB P RUNCMP FREEZE PROTECT WELL -PJSM -LRS PUMP 78 BBLS DIESEL DOWN IA, TAKING RETURNS THRU TUBING INTO PITS. -SHUT IN LRS. -LET DIESEL U-TUBE FOR 1 HR. 15:00 - 16:00 1.00 WHSUB P RUNCMP RIG DOWN LANDING JOINT AND FREEZE PROTECTION EQUIPMENT ON RIG FLOOR. -VOID BOP STACK OF FLUID 18:00 - 18:00 2.00 WHSUB P RUNCMP INSTALL ANDTESTTWC -PJSM -DRY ROD IN TWC -PRESSURE TEST TWC FROM BELOW TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH.3.1 BBLS TO PRESSURE UP,3.1 BBLS BLED BACK AFTER TEST. -PRESSURE TEST PASSED -RIG DOWN TESTING LINES FROM WELLHEAD 18:00 - 20:30 2.50 BOPSUR P RUNCMP CHANGE OUT TOP RAMS -PJSM -CHANGE OUT TOP RAMS FROM 2-7/8"X 5" VBR'S TO 7"SOLIDS *SIMOPS:CHANGE OUT SAVER SUB ON TOP DRIVE Printed 11/11/2015 3:38:05PM • North America-ALASKA-BP Page 69 of 69 Operation Summary Report Common Well Name:11-22 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/30/2015 X4-011M5-E:(4,400,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 14 Spud Date/Time:3/30/1990 12:00:00AM Rig Release:10/30/2015 Rig Contractor:DOYON DRILLING INC. UW:500292203500 Active datum:11-22A KBE 55.3't_tl55.3ousft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 23:30 3.00 BOPSUR P RUNCMP NIPLE DOWN BOP'S -PJSM -NIPPLE DOWN BOP'S -STAND BOP BACK ON PEDESTAL AND SECURE *SIMOPS:LAY DOWN 4.5"HANDLING TOOLS FROM RIG FLOOR 23:30 - 00:00 0.50 WHSUR P RUNCMP CHANGE OUT DEFECTIVE LOCK DOWN SCREW ON WELLHEAD. -PJSM WITH CAMERON -PULL DEFECTIVE LOCKDOWN SCREW, CHASE THREADS AND INSTALL NEW ONE. TORQUE TO PROPER SPECS *SIMOPS:INSTALL AUGER IN PITS. 10/30/2015 00:00 - 01:00 1.00 WHSUR P RUNCMP CHANGE OUT DEFECTIVE LOCK DOWN SCREW ON WELLHEAD. -PULL DEFECTIVE LOCKDOWN SCREW, CHASE THREADS AND INSTALL NEW ONE. TORQUE TO PROPER SPECS *SIMOPS:RIG DOWN BULK FUEL UNIT. 01:00 - 05:00 4.00 WHSUR P RUNCMP INSTALL ADAPTER FLANGE,TEST AND N/U TREE -PJSM -INSTALL CAMERON 13-5/8"5K X 4-1/8"5K ADAPTER FLANGE -TORQUE TO SPECS -TEST TUBING HANGER TO 5000 PSI FOR 30 MINUTES-PASSING TEST START AT 5250 PSI, 15 MINUTES BLEED 5110 PSI,30 MIN BLEED 5095 PSI-PASSING TEST. -N/U TREE -TEST TREE TO 250 PSI/5000 PSI FOR 5 MINUTES EACH-VISUAL LEAK TITE TEST ON TREE-NO LEAKS OBSERVED *SIMOPS:CLEAN PITS,RIG DOWN CIRCULATING LINES ON CHOKE SKID,R/D ROCKWASHER,SKID ROCKWASHER CONVEYOR INTO RIG,BREAK DOWN LINES IN HELL HOLE ON FLOOR FOR RIG FLOOR SKID. 05:00 - 06:00 1.00 WHSUR P RUNCMP SECURE TREE AND CELLAR ****RIG RELEASE AT 06:00 10/30/2015 SWITCH TO GC-1D WELL Printed 11/11/2015 3:38:05PM • • 11-22A/ AL1 Well History, (Post-Rig Workover) ACTIVITYDATE I .: SIM, .a T/I/O=TWC/0/0. RD TEMP#98 (4" SV) and installed 4" upper tree S/N #120569234-4. Torqued to API specs. RD piggyback TEMP#78 (2" IA) and TEMP#01 (2" OA) installed blind flanges, torqued and PT'd to API specs. RU CIW lubricator w/H-plug pulling tool. Stabbed onto tree and PT'd against TWC#260. (passed) Pulled TWC and RD lubricator. RDMO***Job Complete*** SEE LOG FOR DETAILS. Final T/I/O= 325/325/0. Note: Hung 11/1/2015 signage. Tree, wellbore and annulus is fluid packed. ***CONT ON FROM 10/31/15 ***(rwo expense) SWCP#09 STANDING BY FOR VALVE SHOP TO COMPLETE WELLHEAD WORK 11/1/2015 ***CONT ON 11/02/15 WSR*** ***CONT ON FROM 11/01/15 ***(rwo expense) PULLED BALL AND ROD @ 7800' SLM / 7826' MD PULLED 1" BK-DGLV FROM ST#2 @ 6291' SLM /6312' MD PULLED 1" BEK-DCK-2 SHEAR VALVE FROM ST#3 @ 4020' SLM /4041' MD SET 1" BK-DOME (1500 tro 1/4" ports) IN ST#3 @ 4020' SLM/4041' MD SET 1" BK-OGLV( 20/64" ) IN ST#2 @ 6291' SLM/6312' MD PULL RHC PLUG BODY FROM @ 7802' SLM /7826' MD PULL BALL AND ROD FROM @ 9730' SLM/9759' MD ATTEMPT TO PULL RHC PLUG @ 9759' MD RUN 8'x 3.0" PUMP BAILER, S/D @ 9739' SLM 11/2/2015 ***CONT ON TO 11/03/15 *** *** CONT ON FROM 11/02/15 ***(rwo expense) BAILED RIG TRASH FROM 9739' SLM RAN 4 1/2" DOGLESS GS TO RHC BODY @ 9736' SLM,GOOD SHEAR PULLED 4 1/2" RHC PLUG BODY @ 9736' SLM/9759' MD, DRIFT W/3.50" CENT, 2.50"S.BILER S/D @ 10710' SLM / 10733' MD, RECOVERED 1/4 CUP OF CEMENT 11/3/2015 ***WELL S/I ON DEPARTURE *** CTU-6 1.75" HS 90 CT Objective:Mill out shoe tract MIRU. MU BKR milling BHA w/3.70" 5-bladed junk mill. RIH and tag at 10727'. Begin milling from 10727' down to first stall at 10823'. Begin time milling .1fpm down to 10824'. 11/14/2015 ***IN PROGRESS*** CTU-6 1.75" HS 90 CT Objective:Mill out shoe tract MIRU / 11/14/2015 ***IN PROGRESS*** CTU-6 1.75" HS 90 CT Objective:Mill out shoe tract Begin time milling .1fpm down through suspected landing collar at 10824'. Once through landing collar increase ROP to .3fpm down to float shoe at 10856'. 11/15/2015 ***IN PROGRESS*** CTU-6 1.75" HS 90 CT Objective:Mill out shoe tract Begin time milling .1fpm down through suspected landing collar at 10824'. Once through landing collar increase ROP to .3fpm down to float shoe at 10856'. mill through CIBP @ 10,880' Push to 11036' CTMD, 11/15/2015 ***IN PROGRESS*** • • 11-22A/ AL1 Well History, (Post-Rig Workover) CTU-6 1.75" HS 90 CT Objective:Mill out shoe tract Begin time milling at .1fpm down through suspected landing collar at 10824'. Once through landing collar increase ROP to .3fpm down to float shoe at 10856' pumping gel sweeps. Milled through CIBP @ 10880' and pushed down to 11036'. PUH heavy working pipe until free at 10620'. POOH. FP well to 2500'w/60/40 methanol. RDMO. 11/15/2015 ***Job Complete*** a • • co al i a. ( \ ..":1-1 _ o. [ ) - ® = o ) .. 0 0 j \ j \ § § j § x \ x § cc » ° / 6 < co.he 512 \ m 3 g ® o » o y o a § \ } _cs Of ci ie_ \ k o o E o } k k # \ ) { ; k f C T E < - 3 s A I tOz .. / e ■ a a S. # ) x — ( f as a § » k 3 x Cl) ) ' 7 E = S _ - a o / co \ \ go ( o N co- § % o i js ) o _ ) it k » « w 2 ( E \ O. ] J k )CD \ 20 > § 0 ° / ) ( f ) k \ 0 A W ) CO ± § $ ® _ & f / $ § ■ £ 2 ■ \ k 0 = E aT. f ° Nr } ) # E Q 7 us ) ) _ \ . \ 6 j \ \ \ k m m z E _ ) u 7 o 2 ` 0 a a m E E _ cri co \ \ \ ° \ CO n = < § E a / e m / f \ » \ 0 < z Y m . 0 2 \ / 0 0 < $ 0 o 2 3 a \ P % ) < = 0 2 . . .. 0 e co z zo ill ,ii » \ : 0 2 j > ece» \ 0 c 0 7o /o \ \ \ 7 z « ) / 0 \ } j / \ 0 ƒ & \ | in � o Co I E z Lu Z - } ) o \ / + ( f '2 / / B 2 ai ) ƒ c . o § ( ƒ / K ° z t ] Li a .. ° 2 •a I � � -E, k § § \ / } e \ 0 » C_) i 3 { o o / } ) ) 3 ) / ] \ ) / j \ o j , 0 N )} / \ [ 4 it 113 as �\ H- \ K 4 ) / ° 42 = k \ Q co zz .ƒ - H - — Of ci ) / a \ - E `,1)) ® 9 _ z —vs _ I�'/ a 0 z ; ;. \ = e 1k /w % ` \ al _ IJ # < $ f I 1 ~ z r = � � ! £ \ 2 | / _ L. 3 i$ , z a E § \ } >- /\ zz \ § / | i � ) j § \ ) / # _ _ } = A } & : , / y a - 2 I J'ƒ ! / / a) Cc 22 \ �7 / } * 7 3 ] ) ) k Cr 7 ] ■ 3 $ } ± ƒ % \ £ co$ f 0 = 2 2 E 7 \ 't ® / z E \ a = / \ \ a •f ± e § e r E E 15 Fl_ 2 \ r \ \ ) / ) k ty z § f ( 0 0 / ( ` o z \ e - ® o = e « _ = 2 \) co � ) = e, =14 :_i g ) y {H f < CO I . Z �( ci ) i } ® Cl) \ 2 CO CO 01 Z I) = f z 1 ) ) Jk /{ _ La - H N / i ) Cr) g LI E » 2o a) j _ — 3 « f ~ \ f3 3 \ _ x = _ Li LU• ~ .J 0 C j CD /e N 6 +±CO ƒ 2 4425 10) U if Ea - es d > 0. — In 13 a z , -0 \ z - z z / H A / \ \ ! LU j & 7 41 § 0CO \ / ) a Cl) § } 0 0 \ d !f 29 & aa / - 2 �_ = 4 / i§ k — ® 4 ] [ ~ 7 / - f ( \ j§ \,/ k / § go LI- ƒ } CC 0 ) co » } / ƒ i j / / } } \ 0 } 7 j \ J ƒ \ . . 15a3 i� [ \ \ ;) ) \ - 15 \ j \ § 0 j I 0. Z \ / / / ± } 0 0 0 'J 2 5 .. 2 \ 2 / 1 j 7 - ® / / { \ ) \ } 7 4 \ / § ; e = c ci _ ~ \ / COv al- / \ r ,m _ - a I 0 \ I\ -2 \ \ — \ / ■ a J \ < •7 - % f / ƒ } : ± Im c - E / 3 - 0 oa) G ° O & I- : \ _ ~ § 2 E 6 _ \ ] ,I * .. o � 0 \ e ^ ( ( ) \ \ \ - \ ) 0 ■ 5 2 2 y & ! _ ; o e ,. . / - 3 f 3 / ) a } / $ , . _ ° ) \ k 2 £ 2 a 2 } 0 - . .. it a ) < ■ k A { & in_ / o z ) ~ ) ) as 2 2 ( / rs§ 2 / / \ \ _ � ) ( _ a. u g a S { - 2 2 a a % cci � � z , \ \ ƒ § / < } § \ / } \ »$ / j e \ \ }j § \ \ ct \ o . CC z \ ] E < _ » _ c I— k z z Lii . 7 = i $ st _ aan \ \ z UJ Z \ \ 0 co ƒ ) ) \ 2 / ` \ 2 \ k ( y \ < o a | Ems} 0 " �0 al LU � ! \ f , q » r a.. . 6 \ ! 04 % -15 / ) css \ k ƒ / E - �§ / ¢ § .. o = ! @ 3 | k k a / 2 \ ! f \ } ) \ % \ 5 \ ,o § w o = j o o / j ) } } ) / 2 a) j \ § CO/ \ N • U (p O 4) C L Q .c d o) Q O] a. 1N N O O N J f 3 a 1'1.112 E k22 co jO " o Lai d o O U '� N Eco � � - z z f 0 =• L a I- 2 g U m o 0 12 t 0 0 I-2 M !h o E , 1 > a Q O Z 0 MI ei �E v o a N e t 7 a d z 1`.‘1. O .�.. .. 4] 1 N a F cc 41 1'C O z a- 6 c )2 g w O 'C J I 1) a < x CO a i E c E R a E z z ,- N I n.- y a a E m a 2-. N o o 1� o 3 >- E -OZ N th l0 LL Q. C O p y C C) a. O y IC m a ea O m aa N N a ^ ` N i0 0 2 g E " � a az 2 < C co re > a a .. H _ a Y E 0) d iw M :m C ! ra c C) C) v ° o 0- f� N co d E >" _ 0 I- ~ O .Oc y & ii _ o II)c .6 ((} I N 01 'ff y O 'm of E l.t. C C rte- E C U C 1 h y O 'a U ~ J a. z H (.) a E .`u .. N o E _ O U o� y w a1 in o o_ 7E H a c C) o 15 E• 0 iu a .0 as K w 0 U `' w 2 E 30 " E 30 O Z l° >- U = O- W _ Z to Z ) F2 d 0 } lI N a) O O O N i ZZ a3 M " ° i•• aC_ N rHz o �, Z a m m Ela 2a m a a. 0 co i n oo H z •z 1> 8 :3 �m «. Cl) ,U) co .co C E 1-9- 2 $n to U@ a 3I- v o t r aCC o) as a' d O J o o_ c c0 ., O O C) F �C" .E Co h ° m C0 DCO O a H O 0 1LT.v 10 O - O = O p C O o -I- 12 / 1° QOD If/ M a Z N O w v 2 o Q d y Cl c E a- v o Cl) i 3 E .o .0 v U a d v O A .C) L W 1 z U w Z z Z to Z a 0 - c A W i N J re -1 H>' Z CC 01 0 E O 7 Cl) LLI rt c t N o N a W C CO 01 N N N 0 z oo U) 0 a V) U a) J IZ a) O }O IIN2 CC Q a H ij N2 a -o 2 O I Ci a 6 I N L.L W j 0 a y J O .. H o 0 0. H N iC o m a 2 2 m EO p j E j O' o a a) N -o -o a a` a. U a` w 0 >D (n C W N m C 0 W O 0 NOTES:WELNGLE> WE.LFEAD= CM/1 • 11 -22A / Ll C TBG a LNR*'AM X DLS 21.9, 0740' ACTUATOR= BAKER C .„ OKB.ELEV= 60' 1 ` s‘1„1-.'t19 1 _. I BF.ELEV= 20'CONDUCTOR, -I ? J 2179' -4-112" ES X NP,D=3.813" KOP= 795' 91.5,A-538 , Angie M x Anggle= 95"@ 11430 D .-=19.124' o GAS LFT MANDRELS Datum 10513' ' ^ ST' MD TVD DEV TYPE VLV LATCH PORT DATE Datum TVD= 8800'SS 9-5/8"CSG STUB H 2234' f 3 4034 3581 37 KGB-2 DOME BK 16 11/02/15 (10/01/15) 2 6305 5288 41 KG8-2 SO BK 20 11/02/15 13-3/8'CSG,68#,L-80,13=12.415' -( 3939' } L7 1 7633 6307 39 KGB-2 DMY BK 0 10/29/15 ..* 7752' J-{4-1/2"FPS X NP,D=3.813' Minimum ID =2.39" @ 11028' 13" G -DEPLOYMENT SUB w,. -- 7788• -17"X 4-112"HES TNT PKR D=3.656" TOP OF 7'LNR H 7970' ! r 7820' -4-1/2-FES XNP,D=3.813"441 T SCAB LNR 26#,L-80 VAM TOP, i 7975' 7970' -j9-5/8"X 7'TMW LTPw/TEBACK SO/,D=6.175' 0383 bpf,D=6.276" =' • 7983' --19-5/8"X 7 TNV LNR HGR,13=6.12' i 1 9-5/8'CSG,47#,L-80,D=8_681' --I -8189 1` * 0 MLLOUT WINDOW(11-22A) 8189'-8250' - ` I 9656' -�T X 4-1/2"UNIQUE OVERSHOT i 4-1/2'TBG,12.6#,13CR-85 VAM TOP, -1 9640' _0152 bpf,ID=1958' 9695' --14-1/2-FES X NP,D=3.813' 4-1/2'TUBNG STUB(10/25/15) - 9646' SHIFTED CUT DEPTH :i 9721' -I7"X 4-1/2'I-IE TNT P(R,D=3.866' 9752' 141/2"HES X NP,D=3.813' 9806' H 7"X 5'BKR 2RH ZXP LTP w REBACK SLY,D=3.958" 4,2'TBG,126#,13CR-85 VAM TOP, 981TI ' 9811' -4-1/2"WLEG,D=3.958' 1 .0152 bpf,D=3.958" J -I ELMD TT NOT LOGGED 1 7"LIR,29#,L-80 NSCT,.0371 bpf,D=6.184' H 9846' � ? 9826' -5"X 4-12"XO,D=3.958" 17"MARKER JOINT - 10074' . 10836' -I412"LANDNGCOLLAR TOP OF 4-1/2-LNR..---1 1085T I t I: 10857' -1 7-X 41/2"TNV SSH PKR,D=4.0' 10908' -14-12"INV X NP,D=3.813' 10913' H4-1/2"PORTED PUP 7"LIR,29#,13CR NSCT,.0371 bpf,E)=--6.184" - 10910' I Apt 1 10915' -{FISH-FASOREL DEBRIS(7/13/06) PERFORATION SUMWIRY � 10999' --14-112"TIN MLSA C0 G'OSRE JT,D=3.877' i FIEF LOG:Z-DEN ON 07/22/95 ANGLE ATTOP FERF:WA MLLOUT WINDOW(11-22AL1) 11001'-11015' Note.Refer to Production DB for historical pert data SEE j SPF INTERVAL OprdSgz SHOT SQZ 11028' H3"G DEPLOY SUB,D=2.39" I 11-22A • X----__ - _ PBTD 1-{-,1824'....1 --SEE PAGE 2 FOR FERE SLWARY- _ -_ I _ _ _,1-22A L1 II - -_ -SFE PAGE 2 FOR PERE SURRAARY- -41•,Z2A / L 1'11106' —4-1/2"TNV 1 _FISH:MLLED PLUG 8 PUSHED DH(11/15/15) H 11036'CTMD /?1" II 1-22 NO-GO,D=3.002' 4-1/2'LNR, 12.6#,13CR-80 NSCT, --f 11760' 2-7/8'SLOTTED LIR,6.5#, 11824' .0149 bpf,D=3.912' L-80 FL4S,D=2.441" DATE REV BY COMMENTS DATE REV BY COM ENTS PRUDHOE BAY UMT 04/26/90 N28E ORIGINAL COMPLETION 11/16/15 RCT/JPuD GLV CIO(11/02/15) WELL: 11-22A 08/02/95 D-16 SIDETRACK 12/01/15 RCT/JM)MLLED CMT/PLUG-SET FISH FERMI Fb: 1950870/1952110 05/27/96 NORDIC CTD EXT.LINER(L1) API No: 50-029-22035-01 (60) 10/30/15 D-14 MVO SEC 34,T11N R15E,88T FU.8 691'FIM_ 1 11/11/15 Jkl) DRLG HO CORRECTIONS 1 11/12/15 AW/JMD FINIAL OCE APPROVAL BP Exploration(Alaska) 11 -22A / L1 ) 47k' h; LI 4. u • r • f 1 s s r 1 1 PERFORATION SUMMARY REF LOG:Z-OBJ ON 07/22/95 ANGLE AT TOP PERF:NMA API M,te:Refer to Roduction IB for historical pert data I I SEE SPF NTBRVAL Opn/Sqz SHOT SQZ I I 11-22A 3-3/r 6 10303-1030& S 09101/02 07/10/06 3-3/8' 6 10323-10328 S 05/11/02 07/10/06 3-3/8" 6 10454-10458 S 07/22/06 10/15/15 3-3/8• 6 10477- 10483 S 07/22/06 10/15/15 _' 3-3/8' 6 10513- 10519 S 07/22106 10/15/15 2-7/8' 6 10662-10700 S 04/04/01 07/10/06 4-1/2' 10 10913-10993 SLOT 08/03/95 1 14.rA !L f' 4-1/2' 10 11028-11737 SLOT 08/03/95 11-22A L1 I1 1-22 `] 2-7/8' 4 11029-118081 SLOT 05/26/96 DATE REV BY COMMENTS DATE REV BY CO!PLU ITS PRUDHOE BAY UNIT 04/26/90 N28E ORIGINAL COMPLETION 11/16/15 RCF/JIRDGLV C/O(11/02/15) WELL: 11-22A 08/02/95 D-16 SIDETRACK 12/01/15 FACT/JM)NLLED CMT/PLUG-SET FISH PERMIT No: 1950870/1952110 05/27/96 NORDIC CTD EXT.LINER(L1) AH No: 50-029-22035-01 (60) 10/30/15 0-14 RWO SEC 34,T1114,R15E,887'FL 8 691'FWL 11/11/15 JM) DRLG HO CORRECTIONS 111/12/15 AW/JM)FINAL ODE APPROVAL BP Exploration(Alaska) rF ry j��sA THE STATEAlaska Oil and Gas em '� of Conservation Commission ALASIc:A �:=,i- Witt = 333 West Seventh Avenue S ,,,� , GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279 1 433 LA Fax 907 276 7542 www aogcc.alaska gov Dave Bjork Engineering Team Leader 1 BP Exploration (Alaska), Inc. I q. - D- 1 P.O. Box 196612 __I) Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 11-22AL 1 Sundry Number: 315-488 Dear Mr. Bjork: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, i1 Cathy P/Foerster Chair DATED this Ay of August, 2015 Encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CORA. .ON • APPLICATION FOR SUNDRY APPROVALS 20 AAC 25 280 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing 0 ' Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing p ' Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well p Re-enter Susp Well 0 Other Sggab Liner 0 C•C�'►'iC7fd� ✓ 2. Operator Name' BP Exploration(Alaska),Inc 4 Current Well Class: 5. Permit to Drill Number: 195-211 ' 3 Address: P 0 Box 196612 Anchorage,AK Exploratory 0 Development Q 99519-6612Stratigraphic 0 Service ❑ 6. API Number: 50-029-22035-60-00 ' 7 If perforating: •8 Well Name and Number: E What Regulation or Conservation Order governs well spacing in this pool? RECEIVD Will planned perforations require a spacing exception? Yes 0 No - PBU 11-22AL1 AUG7 9. Property Designation(Lease Number): 10. Field/Pools: pG 1 1 2015 p ADL 028325&028328 • PRUDHOE BAY,PRUDHOE OIL• 1/8/15 11. PRESENT WELL CONDITION SUMMARY AO *CC Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 11824 • 8988 - 9921 8335 9921 10915 Casing Length Size MD TVD Burst collapse Conductor 80' 20" 32'-112' 32'-112' 1490 470 Surface 3904' 13-3/8" 32'-3936' 32'-3936' 5020 2260 Intermediate 10283' 9-5/8" 30'-10313' 30'-10313' 6870 4760 - Liner 994' 7" 7970'-10910' 6569'-8987' 8160 7020 Liner 144' 4-1/2" 10857'-11001' 8987'-8986' 8430 7500 Liner 796' 2-7/8" 11028'-11824' 8986'-8988' 10570 11160 Perforation Depth MD(ft): Perforation Depth ND(ft)• Tubing Size: Tubing Grade: Tubing MD(ft): 11029-11808 8986-8987 4-1/2"12.64 13Cr80 13Cr80 24-9945 Packers and SSSV Type. 4-1/2" Baker S Packer Packers and SSSV MD(ft)and TVD(ft): 9890/8306 12 Attachments: Description Summary of Proposal II 13.Well Class after proposed work: BOP Sketch Q Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development lI Service 0 14.Estimated Date for Commencing Operations: September 5,2015 15. Well Status after proposed work: Oil 0 - Gas 0 WDSPL 0 Suspended 0 16 Verbal Approval: Date: WINJ 0 GINJ ❑ WAG 0 Abandoned ❑ Commission Representative: Op Shutdown 0 GSTOR 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Warren,Abigail M Email Abigail.Warren@bp.com Printed Name Dave Bjork Title Engineering Team Lead Signature 7�j�#11, Phone +1 907 564 5683 Date54 J- COMMISSION USE ONLY Conditions of approval Notify Commission so that a representative may witness Sundry Number: / 3y � 15 _ C( Plug Integrity 0 BOP Test IN' -. N Mechanical Integrity Test ❑ Location Clearance ❑ Other 0OP tt5 f- fo X 5 o 05I (M Ps /15 Z`F��p 5; /1-vt.v.v1 a rpre-c�Cv: �v 1-�51 tz, Z-5 ) ()S , Spacing Exception Required? Yes 0 No &I Subsequent Form Required' /0 -4''4- Approved by' P APPROVED BYTHE COMMISSIONER COMMISSION Date: 8,r 15. 1 t/TL //8/15" ORIGINAL ,S , Submit Form and Attachments in Duplicate Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval 1 1 , i by 0 Sundry Request for a casing repair Well: 11-22A Date: 8/06/2015 Engineer: Abby Warren MASP: 2437 pai Well Type: Producer Estimated Start date: September 5th, 2015 History: Well 11-22AL1 is a producer with a dual leg completion. The first leg (11-22A)was completed in August, 1995 and the second leg (11-22AL1)was completed in May, 1996 with CTD. Both were completed with slotted liner. A RST Log in 1999 estimated the GOC at 10300'. In 2001, the well was perforated from 10662' to 10700'. In May 2002, an addperf was completed from 10321' to 10308' and finally in September 2002, another addperf was completed from 10303' to 10308'. Average well test results in 2004 shows 28360 scf/stbo GOR. From January until July, the well had an average of 32440 scf/stbo GOR and increasing to 49420 scf/stbo in August and September 2005. IA and OA started tracking in 2007. A LDL was run in 2013 showing leaks at 65' and 7991'. A CMIT-IA x OA passed to 1200 psi. Two sealtite jobs were performed in 2013 and a combo IAxOA passed to 2500 psi in 2014. The IA and OA were still tacking when it was brought back on line and it was not manageable with bleeds. Scope of Work: The primary objective of the RWO is to fix the IAxOA communication and run a deep scab to cover existing perfs Pre Rig Prep Work: W 1 PPPOT-IC to 3500 psi, PPPOT-T to 5000 psi, Check all LDS for movement. F 2 MIT-T to 3500 psi, MIT-IA to 3500 psi to establish a leak rate. MIT-OA to 1200 psi E 3 Perform a power jet cut at 9885' MD. This depth corresponds to 2' above the lower collar of the pup joint directly above the packer. According to the tubing tally the top of the pup joint is at 9878' MD and the top of the packer is located at 9887'. See attached tally from July 12th, 1995 F 4 Circulate the wellbore at a max rate with 9.8 ppg brine (total volume of brine should be -915 bbls which is 1.5 of wellbore volume). FP well with diesel to 500'. Perform a post cut CMIT-TxIA to 1000 psi. ✓ 5 Set a TWC, ND the tree, NU the dry hole tree, PB IA and upper OA Valves O 6 Remove the well house&flow line. Level the pad as needed for the rig. Proposed RWO Procedure: • MIRU Doyon 14. • ND tree. NU and test BOPE with four preventers configured top down (annular, 9-5/8" fixed rams, blind shears, mud cross and 3-h/2" x 6"VBR's). Test the blind and VBR's to 3,500 psi and the annular to 3,500-psi. Pull TWC. • Pull the 4-1/2" tubing from the cut at-9885' MD • RIH with drillpipe and a set of seals, test down the DP against the plug to 3500 psi • RU Eline and run USIT. Set RBP and cut casing. Pull and LD old 9-5/8" casing. • Change out upper rams to 7" fixed • Run 7" tieback from 7959' to surface. Cement tieback to surface with -545 bbls of 15.8 ppg Gasblock Cement. Land casing in existing wellhead. Install packoff and test • Perform drill out. PT casing to 3500 psi. Pull RBP • Mill and recover old packer at 9888' • Run 4-1/2" scab liner with TOL -9800' MD. Cement with -20 bbls of 15.8 Class G cement • Perform drill out run and clean up shoe track • Run new 4.5"tubing 13Cr with 7" x 4-1/2" gas lift completion. • Set packer and MIT-T& MIT-IA to 3500 psi • Set a TWC and RDMO. Post ri Work V 1 Pull the TWC S 2 Pull Ball and rod, and RHC. Set GLM design TREE= McEVOY TY NOTES:WELL ANGLE>700 @ 10710'•" WOAD= CAMERON 11 -22A / 1_1 L JME TBG&LNR""MAX DOGLE:21.9" • ACTUATOR= BKR C 10740'"' OKB.ELEV= 60' BF.ELEV= KOP= 795' 20"CONDUCTOR ? 2234' 4-1/2"CAM TRCF-4A SSSV PP,D=3.812' Max Angie= 95"@ 11430' 91.5.A-536 (LOCKED OUT 04911/04) Datum MD= 10513' D=19.124' Datum TVD= 8800 SS GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE 13-318"CSG,68#,L-80,D=12.415" H 3939' . 1 4297 3790 39 LB DMY RM 0 04/28/14 2 6802 5666 40 LB DMY RM 0 04/28/14 3 7911 6523 39 LB DMY RM 0 03/08/14 TOP OF 7"LNR - 7970' 7970' H 9-5/8"X T TNN LTP w/TIEBACK SLV .10=6.175" 9-5/8"CSG,47#,L-80,D=8.681" -{ -8189 7983' -9-5/8"X 7"TM/LNR HGR,D=6.12' Minimum ID =2.39" @ 11028' VAL MLLOUTIM+DOW{11-22A) 8189' 8250' )‘..9.: # 3" G -DEPLOYMENT SUB x x 7"LNR,29#,L-80 NSCT,.0371 bpf,D=6.184" H 9$46' /$ per— 9888' H T X 4-112"BKR S PKR D=3.875" 8 9921' H4-1/2"HES X NP,ID=3.813" -----# 9921' H4-1/2"XX PLUG(02/22/15) 4-1/2"TBG,12.6#,13CR-80 NSCT, - 9942' —' `- I 9942' H4-1/T WLEG,D=3.958" .0152 bpf,D=3.958" H ELMO TT NOT LOGS 7"MARKER JO 'IT - 10074' • 11 TOP OF 4-1/2"LNR - 10857' 10857 H7'x 4-1/2"TW SSH PKR,13=4.0" 10908' H4-1/2"TNN X NP,D=3.813" 7'LNR,29#,13CR NSCT,.0371 bpf.D=6.184" ---I 10910' 10913' •--I4-1/2"PORTED PUP � 10915' --I FISH-FASDRLL DEBRIS(7/13/06) FERFORATDU N SWARY I 10999' -I 4-1/2'TNN MLSA COMPOSITE JT,D=3.877" REF LOG:Z-DEN ON 07/22/95 I y ANGLE AT TOP FERF:WA I We:Refer to Production DB for historical pert data MLLOUT WNDOW(11-22AL1) 11001'-11015' SCE SFP INTERVAL1- Opn/Sqz SHOT 1 SQZ —_ 11028' HT G DEPLOY SUB,D=2.39" 11-22A ��� ` 3-3/8" 6 10303-10308 S 09/01/02107/10/06 I I 3-3/8" 6 10323-10328 S 05/11/02 07/10/06 `` -- - I 3-3/8" 6 10454-10458 0 07/22/06 I I -• -- PBTD H 11824' 3-3/8" 6 10477-10483 0 07/22/06 I 3-3/8" 6 10513-10519 0 07/22/06 I I 1 2-7/8" 6 10662-10700 S 04/04/01 07/10/06 ` -11-22A'/L1 � NN 11106' 4-1/2"T •. 4-1/2" 10 10913-10993 SLOT 08/03/95 I' 'i l - •gilb NO-4-1/2" 10 11028-11737 SLOT 08/03/95 I I � D=3.002' 11-22A L1 I I 2-7/8"SLOTTH)LTR,6.5#, H 11824' 2-7/8" 4 11029-11808 I SLOT 05/26/96 1�1-22A L-80 FL4S,0=2.441" 4-1/2"LNR,12.6#,13CR-80 NSCT, H 11760' .0149 bpf,D=3.912 " L DATE REV BY COMMENTS DATE REV BY COWS ITS FRUDFOE BAY UNIT 04/26/90 N28E ORIGINAL COMPLETION 12/02/14 PJC PERFORATION CORRECTIONS WELL: 11-22A 08/02/95 D-16 SIDETRACK 02/22/15 GJB/PJC SET XX PLUG PERMIT Pb: 1950870/1952110 05/27196 NORDIC CTD EXT.LINER(L1) AR Pb: 50-029-22035-01(60) 05/05/14 JLS/JM)GLV C/O(04/28/14) SEC 34,T11N,R15E,887'FTI.&691'FIM. 08/29/14 JMJ CLEANS LP SCHEMATIC 12/01/14'MGS/PJC PULL XX PLUG BP Exploration(Alaska) TREE= Mc EVOY -------- -ACTUATOR = CAMERON 1 1 -2 2 A SAFETY ES: W TR IN CELLAR. WELL ANGLE>70°@ ACTUATOR= BKR C L I 10710'. r�inA� .aEv= 6�ROPt,JED BF.ELEV= ---- -- KOP= 795' ' 1 H4-1/2"HES X NP,3.813" ?Au Angle= 95°@ 11_430' 4 Datum MD= 10513' ` Datum TVD= -- 8800'SS —19-5/8"TBG STUB(___/ / ) 13-3/8"CSG,68#,L-80,D=12.415" — 3939' I 4 LI 111 1 7"SCAB LNR,26#,L-80 VAM TOP, H .0383 bpf,D=6.276" TOP OF 7"LNR H 7959' I 9-5/8"CSG,47#,L-80,ID=8.681" H I 8189' 11 '1 11.4 I ^9,653' -I4-1/2"HES X Nom,D=3.813" 1N\ ••�•�•.• '� [ 9,684' 1�7"X4-1/2"HES TNT Mt,ID= " I 4-1/2"TBG,12.6#,13CR-85 VAM TOP, H 9,800' 1��11�111��0 —9,718' —14-1/2"HES X NP,D=3.813" .0152 bpf,ID=3.958" 1�1�1.1�1111• 1.1...1.1.1.E _ i ^9,800' —14-1/2"finer top for Scab Liner J RA TAG —1 10749' � "` V.4 10857' HTM/7"X 4-1/2"SSH PKR,D=4.0" TOP OF 4-1/2"LNR — 10857' 1' 10908' —14-1/2"HES X NP,D=3.81" 1‘7"LNR,29#,13CR.0371 bpf,D=6.184" —1 10910' ,it 10913' H4-1/2"PORTED PUP 4-1/2"LNR, 12.6#,13CR-80, .0149 bpf,D=3.912" — 10913' \14 10915' FISH-FASDRLL DEBRIS(7/13/06) TOP OF 4-1/2"SLID LNR —I 10953' 2-7/8"SLTD LNR,6.5#,L-80,.0058 bpf,D=2.441" —{ 11824' MLLOUT WNDOW(11-22AL1) 11001'-11015' PERFORATION SUMMARY " 11028' -13"G DEPLOY SUB,D=2.39" REF LOG:Z-DEN ON 07/22/95 ANGLE AT TOP FERE:27°@ 10303' \ _�+ FBTDH 11824' Note:Refer to Production DB for historical perf data 2-7/8"LNR 6.5#, 11814' SIZE SFF INTERVAL Opn/Sqz SHOT SQZ A H L-80,ID=2.441" 3-3/8" 6 10303-10308 S 09/01/02 07/10/06 s, , 3-3/8" 6 10323-10328 S 05/11/02 07/10/06 ` 3-3/8" 6 10454- 10458 0 07/22/06 11106' —ITIW NO-GO,D=3.002' 3-3/8" 6 10477-10483 0 07/22/06 ' 3-3/8" 6 10513-10519 0 07/22/06 2-7/8" 6 10662-10700 S 07/10/06 WA 4 10953-10993 SLID 08/03/95 ` PYA 4 11028-11737 SLTD 08/03/95s,# L1 2-7/8" 4 11029- 11808 SLTD 05/26/96 4-1/2"LNR-SLID, 12.5#,13CR-80, .0152 bpf,D=3.958" H 11737' 4-1/2"LNR,12.6#,13CR 80,.0149 bpf, D=3.912" 11760' DATE REV BY COMMBJTS DATE REV BY COIVMENTS PRUDHOE BAY UMT • 1990 ORIGINAL COMPLETION WELL: 11-22A • 08/95 SIDETRACK PERMIT No:'1952110 • 05/96 CTD EXT.LIN62(L1) AR No: 50-029-22035-60 08/29/14 JMD BULT PROPOSED SEC 34,T11 N,R15E 887'FPL&691'FWL BP Exploration(Alaska) o. 3 • E: II U•CN J 1 M O = ;5 ... wz s 11 0tir7 Eno @ +J�o cn 3 01 O $ a I¢ IaJ o J ii �¢ix > a -Io I- Z az j m Y 0 m m � Q ~O p m y N MI �,N tD I� 0 1 •g 0 Ci \ ::: Z 11111 0 N LI gg ZUIT Q¢N - ., Q. Z.is$ Pa3 V ` J a Y -IDL„LD--LT-- m Z x� 0 G/ IR, a°- C i —IYccts z `m g Niil ,,, i i3 m 3 i I $ TA' Vo o w egg i ! na �x § Q II- � .._ -- III.0_ it ■i ii :III , iii __ ,,. L.7_ h. — q w Z 0 o - ll co p _ II V v p = o I m C.' ir 111 if I I FA gg eilliiilliall. IIIIMMII lo In 1.\ u •-- i 4 iiS i i • , VI cc U.) 4:1) Cn k M a) CN 6. TO. > v 5 (5 > c Tzs C) >; 1 0. 0 41) > W CO — _ o e4 , I— . z -20 =oo . I co ,,, To _r_cts 75 9 -Rt (.0 4".." E -- E N- I ; CI -0 a— Co as: 0 a) 0 III s z cc z "ai -- f .J , 1 tt,..,.1 ci 11\ dtli 1 11111:111......_ (111:11) 0 %Yll "RIM . 4ihi ,1.1 es AIP , . t 411k cy szu > c 6 zi 11111111111 II\ tn Nil o v 2 0 1.1- CO 111101 IS ,-- 111\ galli Alig bill 12 4411111 1 'Ill\ A IF (1) (I) ri 411, • .> .c 0 -J 1W406.. , ''.:11 ' a) o 14:111D y a 0 0 a) vikillk i.... c Oa) 2 g• a Mil (/) 0 ...7i 7•-; ...._J cr o ).- •E < .c III w I— (1111 < air)s c.1 0.1 C6 2 earommi E at. Ct cq ..... N 195211 25 473 WELL LOG TRANSMITTAL DATA LOGGED SI`/2015 ;.I K.BENDER To: Alaska Oil and Gas Conservation Comm. February 11, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 RECEIVED ��a, Anchorage, Alaska 99501 R1 4� Y MAR 0 6 2015 RE: Injection Profile(Spinner Log): D.S. 11-22A L1 Run Date: 1/29/2015 AOGCC The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline&Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 D.S. 11-22A Ll Digital Log file 1 CD Rom 50-029-22035-60 Production Profile (Final Field Print) 1 Color Log 50-029-22035-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com 1) ./d2-a-Pr-ck)17) I.5_e4Date: Signed: XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /¢¢~..--~// File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned b ,~'~ianna TO RE-SCAN Vincent Nathan Lowell Date"i¢,;~ ,).~ ' /,,~,.,' Is~ ~ Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~ . RECEIVED STATE OF ALASKA. SEP 2 7 2006 ALASKA Oil AND GAS CONSERVATION COMM~ION REPORT OF SUNDRY WELL OPERA TIO~sa Oil & Gas Cons. Commission . 1. Operations Performed: Stimulate 0 OtherD AbandonD RepairWellŒ PluQ PerforationsD Alter Casing 0 Pull TubingD Perforate New PoolO WaiverD Time ExtensionD Change Approved ProgramD Operation ShutdownD Perforate IKI Re-enter Suspended WellD 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Œ] ExploratoryD 195-2110 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 StratigraphicO ServiceD 50-029-22035-60-00 7. KB Elevation (ft): 9. Well Name and Number: 55.00 11-22AL1 8. Property Designation: 10. Field/Pool(s): ADL-028328 Prudhoe Bay Field 1 Prudhoe Bay Pool 11. Present Well Condition Summary: Total Depth measured 11824 feet true vertical 8989.0 feet Plugs (measured) None Effective Depth measured 11824 feet Junk (measured) FasDrill Plug Debris @ 10915 (07/13/2006) true vertical 8989.0 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 32 - 112 32.0 - 112.0 1490 470 SURFACE 3910 13-3/8" 68# L-80 29 - 3939 29.0 - 3505.0 4930 2270 PRODUCTION 8161 9·5/8" 47# L-80 28 - 8189 28.0 - 8189.0 6870 4760 LINER 1887 7" 29# L-80 7959 - 9846 6560.0 - 8264.0 8160 7020 LINER 1064 7" 29# 13Cr80 9846 - 10910 8264.0 - 8987.0 8160 7020 LINER 903 4-1/2" 12.6# 13Cr80 10857 - 11760 8986.0 - 8985.0 8430 7500 SL TD LNR 796 2-7/8" 6.5# L-80 11028 - 11824 8985.0 - 8987.0 10570 11160 Perforation depth: Measured depth: ~ 10454-10458,10477-10483,10513-10519, SLTD 10953-10993, SLTD 11028-11737, L1 SLTD 11029-11808 True vertical depth: ~ 8811-8814,8829-8833,8855-8860,8986-8986,8985-8985, L 1 SL TD 8985-8987 TubinQ ( size, Qrade, and measured depth): 4-112" 12.6# 13CrSO @ 26 - 9942 Packers & SSSV (type & measured depth): 7" Baker Packer @ 9888 7" TIW SSH Packer @ 10857 ¡~,-: 1'>. ~t v,"",· ~ ~-- 12. Stimulation or cement squeeze summary: Intervals treated (measured): JRBDMS 8Ft (] CT 0 3 2006 Treatment descriptions including volumes used and final pressure: 13 Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Mef Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: SI -- --- --- 413 Subsequent to operation: 534 5,201 6092 --- 227 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentŒ ServiceD Copies of Logs and Surveys run _ 16. Well Status after proposed work: Daily Report of Well Operations _ ! OilŒ] GasD WAG 0 GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISUndry Number or NIA if C.O. Exempt: Contact DeWayne R. Schnorr N/A Printed Name DeWayne R. Schnorr " Title Petroleum Engineer Signature ~i2L. Hf. y", JI ~ Phone 564-5174 Date 9/22/06 Form 10-404 Revised 4/2004 '. ¡'.¿ Ilj 11\1 A L . . 11-22AL 1 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 07/25/2006 ***WELL FLOWING ON ARRIVAL***(post adperf / cmit sqz) CANCELED JOB, WELL ALREADY KICKED OFF ***GIVE WELL BACK TO DSO, LEFT FLOWING*** 07/22/2006 PERFORATED 3 INTERVALS: 10513' - 10519',10477' -10483', AND 10454' -10458'. GUN DATA: 33/8" PJ 3406, HMX, 6 SPF, 60 DEG PHASING, 38.6" PENE, 0.45" EH, 22.7 GMS. PERFORATION INTERVALS PER JEWELRY LOG DATED 4-APR-2001. SHOOTING DEPTH FOR RUN #3 CHANGED TOP SHOT FROM 10459' TO 10454' PER BOYLES/MIDDENDORF. DID NOT TAG TD. JOB COMPLETE. 07/20/2006 ***WELL S/I ON ARRIVAL*** (post cmt sqz) RAN 33/8" DMY GUN & S. BAILER TO 10734' SLM, STOPPED DUE TO DEV. (75 degrees).....S. BAILER EMPTY ***WELL LEFT S/I*** 07/13/2006 Continue running in hole displacing well pumping N2 @ 500 scf to tiger tank while RIH 80 fpm getting 1/1 returns. Park cT @ 9000' reduce N2 rate to 300 scfm. Continue flowing well at least two full well bore volumes to tiger tank taking straps and samples every 15 min. Turn well toward facility and put in test. Rate after 3 hours in test - 2.7 mmcfd x 0 bfpd. PUH to 5778' to check wear at weld. CT wall thickness = 0.088". RIH to check for plug debris in liner. Tag liner top at 10,886' CTM. Unable to pass through liner top. Deviation at liner top = 88 degrees. Will require centralizer to drift through liner top. POOH. CT at max run life. RDMO to swap CT. Notify drill site operator. Well left on production and in test. *** Job Complete*** 07/12/2006 RIH w/ 2 7/8" PDM Motor and 3.70" 5 blade junk mill. WHP @ 500 hold for a few min. Continue in hole taking returns to return tanks. Tag FasDrill @ 10,910' CTM. Circ 2 Bio Sweeps down and recip up to TT with XS 2% KCI. Minimal fines in 2nd Bio sweep seen at tanks. Swap to diesel and circulate. Mill from 10,910' to 10,916' and plug free. Push to X nipple at 10,933' CTM. Mill through remainder of plug body. POOH. Preform weekly BOPE test. PT N2 lines to 4000 psi and diplace CT to Tiger Tank @ 1000 scf, RIH pumping @ 500 scf. 07/11/2006 MIRU CTU #5 ***Job Scope Mill Cement & FasDrill*** MU WF 2.875" MHA, Pull test to 20k & PT to 3500, MU 2 7/8" PDM Motor and 3.70" 5 Bladed con caved junk mill 07/10/2006 CTU #5 Pump 50bb115.8ppg Class G LARC cement. Lay in 1/1 across perf interval (10700' to 10303') w/50% losses.(approx 14.9 bbl cement behind pipe). Squeeze to 2000 psi. Hold WHP for 30 minutes. Lost 52 psi over 20 minutes. Bleed down to 1000psi. Began cleanout with 1.5# biozan. Jet 1 bpm across perfs with 1.5# biozan followed by 1 % XS KCL. Jet down and up pass in the liner from 10870' to tubing tail at maximum rate, slowing to 1 bpm from 30' above and below perforations. PT squeeze while waiting on fluid (well loaded with 1 % KCI, 500 psi on WHP (1000 psi estimated overbalance» lost 39 psi pressure loss in 30 minutes. RIH to 10730' ctm to lay in TEA across perforations. Pulled 4k heavy pulling off bottom and kept moving to upper perf interval. Laid in TEA across upper perfs. . POOH washing all jewelry with up-down-up passes at max rate. Freeze protect with MeOH from 2000' using 32 bbls. Well shut in with 500 psi trapp~d. Notify operator of well status. FWHP=550/670/650. *** Job Complete *** Page 1 . . 11-22AL 1 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 07/09/2006 RIH w/4.5" HES "Fas-Dril" plug...Set Fas Drill at 10885'....POOH.... Make up 2.5" BDN BHA. Bullhead kill using 270 bbls of 1 % KCf. Injectivity was 1700 psi at 3.5 bpm. RIH while pumping 1% KCI to keep hole loaded and tagged plug and corrected depth (-25') . Flagged CT 15' above plug. PUH and pumped 40 bbls of 12% HCI DAD acid reciprocating from 10300' to 10705' with 3 passes. Initial injection pressure was 1 bpm @ 290 psi with 1 % KCI. As acid exited nozzle, initial breakdown of formation was seen. After 30 bbls had exited, WHP started rising. After displacing all acid, injectivity was 1 bpm at 610 psi. Discuss with Anchorage engineer path forward. Pumped 2nd acid breakdown with 10 bbls 12% HCI, 20 bbls 8:2 Mud Acid in two stages treating across upper and lower perforation interval as seperate stages. Post acid injection rate was 2 bpm at 220 psi with 1 % KCI. Begin mixing cement. 07/08/2006 CTU #5 MIRU. MU 2 3/8" Weatherford MHA w/3.60" x 2.65' drift. Drift to 11025' CTM. POOH. MU BHA #2 PDS logging string. RIH and log at 40 fpm from 11000' ctm to 9750' ctm at 40 fpm. POOH. Confirm good data with PDS logger. FLUIDS PUMPED BBLS 51 50/50 Methanol Water 38 Diesel 1069 1 % KCL Water 929 Extra Slick 1 % KCL Water 237 Fresh Water 49 3.5% LubTex, 1.5% EMI 775, 0.25 ppb Flovis 40 12% HCL/10% Xylene DAD HCL (titration 12.1%, Iron < 50 ppm) 10 12% HCL with Chrome Additives (titration: 10%; Iron < 50 ppm) 20 3% Ammonium Chloride 30 TEA 50 Class "G" 15.8 ppg LARC Cement 2523 TOTAL Page 2 PERFORA TION SUMMARY REF LOG: Z-OEN ON 07/22/95 ANGLE AT TOP PERF: 27 @ 10303' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE A 10303 - 10308 10321 - 10326 10454 - 10458 10477 - 10483 10513 - 10519 10662 - 10700 10953 - 10993 11028 - 11737 L1 11029 - 11808 TREE = WB..LHEAO = ACTUATOR = B. B..EV = BF. B..EV = KOP= Max Angle = Datum MD = Datum1VO= McEVOY CAMERON BKRC 55' 795' 95 @ 11430' 10513' 8800' SS 113-3/8" CSG, 68#, L-80, ID = 12.415" I Minimum ID = 2.39" @ 11028' 3" G - DEPLOYMENT SUB 1 TOP OF 7" LNR I 19-5/8" CSG, 47#, L-80, ID = 8.681" I 7" LNR, 29#, L-80, .0371 bpf, 10 = 6.184" 14-1/2" TBG, 12.6#, 13-CR-80, .0152 bpf, 10 = 3.958" I IRA TAG I I TOP OF 4-1/2" LNR I 17" LNR, 29#, 13-CR. .0371 bpf, 10 = 6.184" I 14-1/2" LNR, 12.6#, 13-CR-80, .0149 bpf, 10 = 3.912" I TOPOF 4-1/2" SLTO LNR I 12-7/8" SL TO LNR, 6.5#, L-80, .00579 bpf, ID = 2.441" I 3-3/8" 3-3/8" 3-3/8 " 3-3/8" 3-3/8" 2-7/8" NlA NlA 6 6 6 6 6 6 4 4 2-7/8" 4 11-22AL 1 SAFETY NO.WTRIN CB..LM. 70° @ 10710' AND 90° @ 10907. ***IAxOA COMM. OPERATING LIMITS: MAX lAP = 1000 PSI, MAX OAP = 1000 PSI (01/05/06 WAIVER) *** CHROME LNR & TBG*** . 2234' 4-1/2" CAM TRCF-4A SSSV NIP, 10 = 3.81" (LOCKED OUT 04/11/04) GAS LIFT MANDRELS ST MD 1VD DEV TYÆ VLV LATCH 1 4297 3790 39 LB DOME RA 2 6802 5666 40 LB DOME RA 3 7911 6523 39 LB SO T-2 PORT DATE 16 04/07/03 16 04/07/03 24 04/07/03 MILLOUTWINDOW 8189' - 8250' -14-1/2" HES X NIP, ID = 3.81" I -14-1/2" WLEG I H B..MD TT NOT LOGGED I -i TIW 7" X 4-112" SSH A<R, 10 = 4.0" I -14-1/2" HES X NIP, 10 = 3.81" I -i 4-1/2" PORTED PUP I -I FASDRlLL A...UG DEBRIS (7/13/06) -13" G DEPLOY SUB, ID = 2.39" I \ 11824' I \ 2-7/8" LNR, 6.5#, ~V, '~\~_80' ID=2.441" I " ~ l 11106' H TIW NO-GO, ID = 3.002' I \ \ \ \ \ \ S S o o o S SLTO SLTO \ \, \ 07/10/06 07/10/06 07/22/06 07/22/06 07/22/06 07/10/06 08/03/95 08/03/95 \ \ \ \ ~' SLTO 05/26/96 14-1/2" LNR-SL TO, 12.5#, 13-CR-80, .0152 bpf, ID = 3.958" 1-1 14-1/2" LNR, 12.6#, 13-CR-80, .0149 bpf, 10 = 3.912" I PRUDHOE BA Y UNff WELL: 11-22AL 1 ÆRMff No: '1952110 API No: 50-029-22035-60 SEC 34, T11N, R15E, 2130.72' FB.. & 807.34' FNL OA TE REV BY COMMENTS 1990 ORIGINAL COMPLETION 08/95 SIDETRACK 05/96 CTD EXT. LINER (L 1) 01/05/06 RPHlPJC WM/ER SFTY UPDATE 01/28/06 BMcNlPJ LATERAL LNR CORRECTIONS 05/30/06 DTM WB..LHEAO CORRECTION DA TE REV BY COMMENTS 07/13/06 SGS/PJC SET FASORlLLI CMT SOl 07/22/06 DFR/PJC ÆRFORA TIONS BP Exploration (Alaska) . . WELL LOG TRANSMITTAL t. -) E-- r,·· ~. '\ / r~~ ~,"") ~. '-". 1\, p,-- ~ ,,.....~.. ~/ .1 \1 !l.~__ ,.,/ ProActive Diagnostic Services, Inc. AUG 2 9 2006 I\Iaska Oil & Gas Cons. Commission Anchorage To: AOGCC Records Department 333 W. 7th Ave Suite 1 00 Anchorage, Alaska 99501 RE: Cased Hole/Open Hole/Mechanical Logs and lor Tubing Inspection(Caliper / MTTJ The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8951 1J EDE ~isk 2J 3J 4J 5J 6J 7J Signed: Print Name: 0.5, 11-22AL 1 Coil Flag 08-Jul-06 ~(:ANNED AUG 3 02005 t_ik ~ ,.:.~+1!-l ~ (VlRlA V\.12..(A Date: 151 Ð9(Ö0 PRoACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL: PDSANCHORAGE(ã1MEMORYLOG.COM WEBSITE : WWW.MEMORYLOG.COM /O¡ó-9ll -L1'IO'ß'd C:lDocumenl8 and SettingsIPDS Anchorage - MPLlDesktopITran..mit_Original.doc STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Pedorate _X ADD PERFS Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 55 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 885' FNL, 4589' FEL, Sec. 34, T11 N, R15E, UM (asp's 708269, 5950858) 11-22AL1 At top of productive interval 9. Permit number / approval number 5122' FNL, 2354' FEL, Sec. 33, T11N, R15E, UM (asp's 705351, 5946540) 195-211 At effective depth 10. APl number 807' FNL, 2131' FEL, Sec. 04, T10N, R15E, UM (asp's 705602, 5945580) 50-029-22035-60 At total depth 11. Field / Pool 807' FNL, 2131' FEL, Sec. 04, T10N, R15E, UM (asp's 705602, 5945580) Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11824 feet Plugs (measured) true vertical 8987 feet Effective depth: measured 11824 feet Junk (measured) true vertical 8987 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 112' 20" 1900# Poleset 144' 144' Surface 3884' 13-3/8" 2160 sx CS III, 600 sx 3939' 3505' Class 'G', 160 sx CS II Intermediate 8134' 9-5/8" 450 sx Class 'G', 439 sx 8189' 6738' ARC Liner 2940' 7" 510 sx Class 'G' 10910' 8987' Sidetrack Liner 919' 4-1/2" U ncemented 10841 '- 11760' 8985' - 8978' Leg off 4.5" Liner 821' 2-7/8" Uncemented 11003'-11824' 8986' - 8987' Perforation depth: measured Open Perfs 10303'~10308', 10321 '-10326', 10662'-10700', 4-1/2" Slotted/Ported Liner f/10913'-10993', 11028'-11737'. RECEIVED 2-7/8" Slotted Liner (off 4-1/2" Liner) f/11029' - 11823'. true vertical Open Perfs 8682'-8686', 8698'-8702', 8947'-8962', 4-1/2" Slotted Liner f/8987'-8986', 8986'-8986', NOV 0 82002 2-7/8" Slotted Liner (off 4-1/2" Liner) f/8985'-8987'. Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR-80, TBG @ 9888' MD; 4-1/2", Packers & SSSV (type & measured depth) 7" x 4-1/2" Baker S Packer @ 9888'. 4-1/2" Camco TRCF-4A SSSV Nipple W/Coupling @ 2234' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 08/17/2002 176 4499 4794 200 Subsequent to operation 10/26/2002 750 17317 6992 204 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. DeWayne R. Schnorr Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · RBD S BFL NOV t ~ 2r~iBMiT IN DUPLICATE O9/O 1/2OO2 09/05/2002 09/1 O/2OO2 09/11/2002 09/11/2002 09/12/2002 O9/20/20O2 09/24/2002 I O/26/2OO2 09/01/02 O9/05/02 09/1 O/O2 11-22AL1 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PERFORATING: PERFORATING SECURE WELL: AC-EVAL; AC-MITOA ANNCOMM --- T/I/O = 2350/1280/1280 Monitor WHP's (Post MIT-CA). SECURE WELL: AC-TIFL SECURE WELL: AC-PPPOT-IC ANNCOMM --- T/I/O =2380/520/520 Monitor WHP's (Post TIFL). SECURE WELL: AC-EVAL; AC-LLRT; AC-MITOA SECURE WELL: AC-BLEED; AC-MITOA TESTEVENT--- BOPD: 750, BWPD: 6,992, MOFPD: 18,833, AL Rate: 1,516 EVENT SUMMARY COMPLETED ADDPERF. SHOT FIVE-FOOT 3 3/8" HSD PERF GUN ON THE INTERVAL 10303'-10308'. RIH W/WELL SHUT IN, NO PROBLEMS RIH. TURNED FREEZE PROTECT TBG & FLOWLINE. T/I/O: 2450/1140/1070 MITOA TO 2400 PSI. FAILED (for W/C). CA FL @ 80' (5 BBLS). PRESSURE CA TO 2000 PSI FOR 10 MINUTES. PRESSURED CA UP TO 2400 PSI WITH 6 BBLS OF DIESEL. IN THE FIRST 15 MINUTES CA LOST 210 PSI, PUMPED BACK UP TO 2400 PSI. In FIRST 15 MINUTES CA LOST 200 PSI. IN SECOND 15 MINUTES CA LOST 50 PSI, REPEATED THREE MORE TIMES WITH THE SAME RESULTS. COULD NOT ESTABLISH AN INJECTION RATE WITH BIG PUMP. CA FAILED MITOA. BLED CA TO 900 PSI. FINAL WHP's = 2450/1140/900 ANNCOMM --- T/I/O = 2350/1280/1280 MONITOR WHP's (Post MIT-CA). 09/11/02 09/11/02 09/12/02 T/I/O = 2450/1400/1370 TIFL PASSED (CA TESTING PROJECT) INITIAL IA FL @ 7782'. BLED IA FROM 1400 PSI TO 430 PSI IN 2 HOURS. POST BLEED IA FL @ 7770'. SI IA BLEED AND MONITOR FOR ONE HOUR. IA PRESSURE REMAINED AT 430 PSi. WHP's = 2450/430/1140. CA FL @ 40'. BLED CA FROM 1140 PSI TO 120 PSI IN 25 MINUTES. SLUGS OF FLUID TO SURFACE. MONITOR FOR 30 MINUTES. CA PRESSURE INCREASED FROM 30 PSi TO 150 PSI IN 30 MINUTES. FINAL WHP's = 2450/430/150. OPEN BLEEDER SCREW FOR 9-5/8" PACK-OFF VOID. PRESSURE WOULD NOT BLEED OFF. TIGHTENED LOCKSCREWS TO ENERGIZE SEAL. OPENED BLEEDER SCREW. PRESSURE WILL STILL NOT BLEED OFF. CHECKED PACKING VOID BLEEDER. VOID IS PRESSURED UP. PPPOT FAILED. ANNCOMM --- T/I/O =2380/520/520 Monitor WHP's (Post TIFL). Page 1 11-22AL1 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 09/20/02 T/I/O - 2450/1400/1380 MITOA PASSED (OA PROJECT). INITIAL OA FL AT 40' (2.5 BBLS). PUMPED OA UP TO 2400 PSI WITH 2.5 BBLS OF DIESEL. IN THE FIRST 15 MINUTE TEST, OS LOST 120 PSI, IN THE SECOND 15 MINUTE TEST, OA LOST 20 PSI FOR A TOTAL OF 140 PSI IN 30 MINUTES. PUMPED OA TO 2400 PSI, IN THE FIRST 15 MINUTE TEST, OA LOST 120 PSI, IN THE SECOND 15 MINUTE TEST OA LOST 20 PSI FOR A TOTAL OF 140 PSI IN 30 MINUTES. BLED OA DOWN TO 320 PSI. FINAL WHP's = 2450/1400/320. 09/24/02 MITOA to 3000 psi PASSED (For W/C) 10/26/02 TESTEVENT--- BOPD: 750, BWPD: 6,992, MCFPD: 18,833, AL Rate: 1,516 Fluids Pumped BBLS 3 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 3 TESTS) 15 NEAT METHANOL 13 DIESEL 55 CRUDE 86 TOTAL ADD PERFS 09/01/2002 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 3-3/8" PJ 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 10303'-10308' Page 2 TRE: McEVOY WR LFF_AD = ClW SAFETY NOTES: WATERIN CELLAI~ 70° @ 10710' AND90° -~-~-o~¥~---~- ........................ '~'~"~ 1 1 -2 2A L 1 @ 1090T- CHROMELNR& TBG. lAX OA COMM KB. ELEV = 55' OPERATING PRESSURE OF1 3-3/8" ANNULUS MUST NOT ~F'."E~-EV ;KOP = ............................ 795' -- I~/ II! . EXCEED 2500 PSI (09/25/02 WAIVER) Datum MD = 10513' i /wi COUPLING, ID = 3.81" DatumTVD-- 8800' SS I~-~,,cs~, ~,,-~o,,~=~.~., H ~' ~ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH IPORI' DATE · 1 4297 3790 39 LBSPM RA Minimum ID = 3.812" @ 2234' ~ 2 6802 5666 40 LBSPM RA 4-1/2" CAM TRCF4A SSSV NIPI I~ 3 7911 6523 39 LBSPM T-2 I MLLOUT WINDOW 8189'- 8250' I-r~°"?'"~ H **~' K,, I 7" LIAR, 29#, L-80, .0371 bPf, ID = 6.184" H 9846' I~.~, ,~ / 19921 M 4-1/2" HBS X NIP, ID: 3.81" I ANGLEATTOPPERF:28@10321' , ~ ~X / ' ' ' ' Note: Refer to Production DB for historical perf data I kZ~\ ~_~ / I 10857' I--~TIW7"X4 1/2"SSHPKR ID-40" I SIZE SPF INTERVAL OpnlSqz DATE ~~ ~ / I/ I I - ' - ' I 3.3/8" 6 10303- 10308 O 09/01/02 o n- ,:-, N/A 4 10953-10993 O 08/03/95 ~~ ~,/ / J 10913' H4-1/2"PORTEOFUP(40.48') N/A 4 11028-11737 0 08/03/95i ~~, ~ / / , , , , 2-7/8" 4 11029-11808 SLTD 05/28/96i ~--Z~ \\/ / I 41019' ~'13"GDEPLOYSUBI 14-1/2'LI~,12.~,13-CR-80, .0149bpf, ID=3.912" ~ 10913' ~ / /'~ ', ~, ' '' './ / ', ' ', ', \ \1 41814' HTOP OF 2-7/8" TOP OF PORTI~ PUP 10913' ~ ~. , , \V ~ '1 ............. I H ~' K / ""." :'-- --__ xx I [ ............ / '/ , / PORTED BULLNOSE 12-7/8" SLTD LNF~ 6.5#, L-80, .00579 bpf, ID = 2.441" M 11799' ['/./x,x 'x~'x -- IT~°~-~'~''~ H ~7~' K ',, ',, I 11737' hl~ SPIRAL ITOPOF4-1/2"LNRH 11737' ~ ',~,~' CENTRALIZER ,, -- I -'""~~ ~SUB W/CPOB 14-1/z' LNR-SLTD, 12.5~, 13-CR-80, .0152 bpf, D =3.958 ~' 11737' I I4-1/2,'LNR'12'6#'13-CR-80,'0149bpf'ID=3'91Z' M 11760' I I DATE REV BY COMIVENTS DATE ~ BY COMIVENrS PRUDHOEBAY UNIT I 1990 O~GINALCOMPLETION 05/11/02 CWS/tlh ADDPERES WELL: 11-22AL1 101/17/01 SIS-SLT CONVERTED TO CANVAS 09/01/02 CWS/KK ADDPERES PERIVIT No: 1952110 02/13/01 SIS-IVF FINAL 09/26/02 BM/TP WA IVER SAFETY NOTES APl No: 50-029-22035-60 , 08/95 , SIDETRACK SEC 34 T11N R15E 2130.72 FEL 807.34 FI~I. I i 05/96 i CTD EXTI~ISION i i 02/27/02 RNfTP I CORRECTIONS BP Exploration (Alas ka} PERFORATION SUIVIVlARY REF LOG: Z-DEN ON 07122195 ANGLE AT TOP PERF: 28 @ 10321' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3.3/8" 6 10303- 10308 O 09/01/02 3-3/8" 6 10321 - 10326 O 05/11/02 N/A 4 10953 - 10993 O 08/03/95 N/A 4 11028 - 11737 O 08/03/95 2-7/8" 4 11029 - 11808 SLTD 05/28/96 DATE REV BY COMIVENTS DATE REV BY COMIVENTS 1990 O~GINAL COMPLETION 05/11102 CVVS/tlh ADD PERES 01/17/01 SIS-SLT CONVERTED TO CANVAS 09/01/02 CWS/KK ADDPERFS 02/13/01 SIS-IVF FINAL 09/26/02 BM/TP WA IVER SAFETY NOTES 08/95 SlDE'rRACK 05/96 CTD EXTB~ISION 02/27/02 RNfTP CORRECTIONS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: ADD PERFS 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address ' P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 885' FNL, 4589' FEL, Sec. 34, T11 N, R15E, UM At top of productive interval 5122' FNL, 2354' FEL, Sec. 33, T11N, R15E, UM At effective depth 807' FNL, 2131' FEL, Sec. 04, T10N, R15E, UM At total depth 807' FNL, 2131' FEL, Sec. 04, T10N, R15E, UM 12. Present well condition summary Operation shutdown_ Pull tubing _ Stimulate _ Plugging _ Perforate _X Alter casing _ Repair well _ Other _ 5. Type of Well: 6. Datum elevation (DF or KB feet) Development X RKB 55 feet Exploratow._ 7. Unit or Property name Stratigraphic Service Prudhoe Bay Unit 8. Well number 11-22AL1 9. Permit number / approval number ~" 195-211 10. APl number "' 50-029-22035-60 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool (asp's 708269, 5950858) (asp's 705351, 5946540) (asp's 705602, 5945580) (asp's 705602, 5945580) Total depth: measured 1 1824 feet Plugs (measured) true vertical 8987 feet Effective depth' measured 11824 feet Junk (measured) true vertical 8987 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 112' 20" 1900# Poleset 144' 144' Surface 3884' 13-3/8" 2160 sx CS III, 600 sx 3939' 3505' Class 'G', 160 sx CS I! Intermediate 8134' 9-5/8" 450 sx Class 'G', 439 sx 8189' 6738' ARC Liner 2940' 7" 510 sx Class 'G' 10910' 8987' Sidetrack Liner 919' 4-1/2" Uncemented 10841'-11760' 8985' - 8978' Leg off 4.5" Liner 821' 2-7/8" Uncemented 11003'-11824' 8986' - 8987' Perforation depth: measured Open Perfs 10321'-10326', 10662'-10700', 4-1/2" Slotted/Ported Liner f/10913'-10993', 4-1/2" S/P Liner 11028'-11737', 2-7/8" Slotted Liner (off 4-1/2" Liner)f/11029'- 11823'. true vertical Open Perfs 8698'-8702', 8947'-8962', 4-1/2" Slotted Liner f/8987'-8986', 8986'-8986', 2-7/8" Slotted Liner (off 4-1/2" Liner) f/8985'-8987'. Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR-80, TBG @ 9888' MD; 4-1/2", 12.6#, 13CR-80, TL~~I ~ ~)~'2~yI~ Packers & SSSV (type & measured depth) 7"x 4-1/2" Baker S Packer @ 9888'. 4-1/2" Camco TRCF-4A SSSV Nipple W/Coupling @ 2234' MD. 13. Stimulation or cement squeeze summary Inte~als treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 168 2563 481 Prior to well operation 05/08/2002 Subsequent to operation 05/13/2002 15. Attachments Copies of Logs and Surveys run_ Tubing Pressure 260 178 2576 482 229 16. Status of well classification as' Suspended _ Service Daily Report of Well Operations__ Oil __X Gas __ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~~~~~v~~ Title: Technical Assistant DeWayne R. Schnorr Form 10-404 Rev 06/15/88 · Date May 21, 2002 Prepared by DeWayne R. Schnorr 564-5174~ ') SUBMIT IN DUPLIcATE"'~~ 11-22AL1 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 04/29/2002 PERFO~TTNG' DR]:FT/TAG 05/11/2002 PERFORATTNG' PERFORATTNG EVENT SUMMARY O4/29/O2 RAN 3 3/8" DUMMY GUN TO 10,700' SLM TOOLS STOPPED TO HAW. TARGET DEPTH FOR BOTTOM SHOT WAS 10,328'. WELL LEFT SHUT-IN. 05/11/02 PUMPED 25 BBLS OF METHANOL DOWN TUBING BEFORE RUNNING E-LINE. SHOT FIVE-FOOT 3 3/8" HSD PERF GUN ON THE INTERVAL 10321'-10326'. RIH W/WELL SHUT IN. WELL VERY STICKY FROM 1650'-3800'. ABLE TO WORK THRU TO SHOT DEPTH. PUMP 25 BBL METHANOL BEFORE POOH. AT SURFACE, TOOLS COVERED IN PARAFFINS. TURNED WELL BACK TO DSO TO POP. Fluids Pumped BBLS I PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( , 1 TEST} 50 METHANOL 51 TOTAL , ADD PERFS 05/11/2002 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 3-3/8" PJ 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 10321' - 10326' Page 1 SCANNED J UN ~, z~ 2_00~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Pedorate _X Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 885' FNL, 4589' FEL, Sec. 34, T11N, R15E, UM At top of productive interval 5122' FNL, 2354' FEL, Sec. 33, T11N, R15E, UM At effective depth At total depth 807' FNL, 2131' FEL, Sec. 4, T10N, R15E, UM 5. Type of Well: Development __X Exploratow___ Stratigraphic__ Service__ (asp's 708269, 5950858) (asp's 705351, 5946540) (asp's 705602, 5945580) 6. Datum elevation (DF or KB feet) RKB 55 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 11-22AL1 9. Permit number / approval number 195-21 1 10. APl number 50-029-22035-60 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11824 feet Plugs (measured) 8987 feet Effective depth: measured 1 1824 feet Junk (measured) true vertical 8987 feet Casing Length Size Cemented Measured Depth Conductor 112' 20" 1900# Poleset 112' Surface 3884' 13-3/8" 216o Sx cs III, 600 Sx Class G, 3939' & 160 Sx CS II Intermediate 8134' 9-5/8" 450 Sx Class G & 439 Sx ARC 8189' Production 2940' 7" 510 Sx Class G 1091 0' Liner 919' 4-1/2" Uncemented 10841 - 11760' Leg off 4-1/2' Liner 821' 2-7/8" Uncemented 11003' - 11824' True VerticalDepth 112' 3505' 6738' 8987' 8985'-8978' 8986'-8987' Perforation depth: 2-7/8" Slotted Liner(off4-1/2" Liner) f/11029' - 11823'. true vertical 8947' - 8962'; 4-1/2" Slotted Liner f/8987' - 8986' & 8986' - 8978'; 2-7/8" Slotted Liner(off 4-1/2" Liner)f/8985' - 8987'. Tubing (size, grade, and measured depth) 4-1/2", 12.5#, 13CR-80 Tbg @ 9942' MD. measured 10662' - 10700'; 4-1/2" Slotted / Ported Liner f/10913' - 10993' & 11028' - 11737'; Packers & SSSV (type & measured depth) 7" X 4-1/2" BAKER S PACKER @ 9888' MD. 4-1/2" CAMCO TRCF-4A SSSV NIPPLE W/COUPLING @ 2234' MD. 13. Stimulation or cement squeeze summary RECEIVED APR 2, ? ZOO1 Oil & Gas Cons. Commission Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation OiI-Bbl 270 Representative Daily Average Production or Injection Data Gas-Mcr Water-Bbl 3700 108 335 3446 327 Casing Pressure Tubing Pressure 205 2O3 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __X 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~1~ ~ Title: DS 11 Surveillance Engineer Dan Babcock Date April 23, 2001 Prepared by Paul Rauf 564-5799 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 11-22AL 1 DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 3/27/2001' 4/04/2001. Drifted w/3-1/2" Cent & sample bailer to 10741' MD. MIRU Wireline Unit. PT'd equip to 3000 psi. RIH w/perf guns & performed tie-in. Shot 38' of add perforations in the 7" casing f/: 10662'- 10700' MD (Zone lB) Reference Log: Z-Density Log 7/22/1995. Used 2-7/8" carriers & all shots @ 6 SPF, random orientation, 60° phasing, & underbalanced press. POOH w/guns - ASF. RD Wireline unit. Well BOL. Obtained representative production test. Page 1 THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED · ON :OR BEFORE JANUARY 03,200_1 M PI_ A T IA L I:: W I= R T Iq M A R C :LORI~MFILM.DOC PERMIT 95-211 95 -211 95-211 DATA DIR SURV GR/ROP-MD 7440 AOGCC Individual Well Geological Materials Inventory T DATA PLUS ~--S~EERY 10999-11824 c~~1~002-11824 ~" ~0977-11797 Page: 1 Date: 05/13/98 RUN DATE RECVD 06/17/96 FINAL 07/25/96 3-6 09/04/96 10-407 Q~COMPLETION DATE ~/2 ?I ~ I DAILY WELL OPS R ~/% Iq~l TO 31 ~/ Are dry ditch samples required? yes .,.-n~ ~.And received? Was the well cored? yes ~Analysis & description received? Are well tests required? yes ~o~ Received? Well is in compliance Ini~£al COMMENTS yes no 0 I:! I I--I--I IM G S G I:!',./I C G S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - DS 11-22AL1 September 03, 1996 AK-MW-60057 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' JhTl Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted magnetic tape with LIS listing. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company ID I::1 I I__!-- I I~ G S lc: ICl L/I r- lC S WELL LOG TRANSMITrAL To: State of Alaska July 25, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - DS 11-22AL1, AK-MW-60057 -' The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 DS 11-22ALl: 2" x 5" MD Gamma Ray Logs: 50-029-22035-60 1 Blueline 1 Folded Sepia F CE VF_..D 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA A-,-,SKA OIL AND GAS CONSERVATION corv,,v, iSSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL E~ GAS [~] SUSPENDED [] ABANDONED BI SERVICE E~ 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 95-211 3 Address 8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50-029-22035-60 4 Location of well at surface 9 Unit or Lease Name 4393' NSL, 4590' WEL, Sec 34, T11N, R15E, U~: :._;~:~:;:~;,:::.~:-??, ? l' PRUDHOE BAY UNIT AtTop Producing Inte~al . ~ ~~ ~. 10 Well Number 157' NSL, 2355' WEL, Sec 33, T11N, R15E, UM. . 11-22AL1 At Total Depth ~ ~~i'~ 11 Field and Pool 805' FNL, 2129' FEL Sec4 T11N R15E UM PRUDHOE BAY FIELD 5 Elevation in feet (indi~te KB, DF, etc.) ~ 6 Lea~ignation and Serial No. PRUDHOE BAY OIL POOL 55' R~~ ADL 28328 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. 15 Water Depth, if offshore ~ 16 No. of Completions 5/20/96. 5/23/96. 5/25/96. N/A feet MSL] 1 17 Tot~ Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Su~ey 20 Depth where SSSV ~t ~ 21 Thic~ess of permafrost 11824'MD/8989'TVD 11824'MD/8989'~D YES ~ NO ~ 2234' feetMD~ 1900'(approx) 22 Type Electric or Other Logs Run MWD Su~ey; GR. 23 CASING, LINER AND CEMENTING RECORD SE~ING DEPTH MD CASING SIZE ~. PER ~. GRADE TOP BOSOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5 ¢ H-40 Surf 112' 30" 190~ Poleset 13-3/8" 68 ¢ L-80 Surf 3939' 17-1/2" 2160 Sx CS III, 600 Sx Cl G, & 160 Sx CS II 9-5/8" 47 ¢ L-80 Surf 10313' 12-1/4" 450 Sx Cl G & 439 Sx ARC 7" 29 ¢ CR-8O/L-8O 7970' 10910' 8-1/2" 510 Sx Cl G 4-1/2" I 2-7/8" 12.5¢ 16.5¢ CR-801FL4S 10857'111028' 11003'111823' 6"1 3.75" Uncement~ Slo~ed Liners 24 Pedorstions open to Production (MD+TVD of Top and BoSom and 25 TUBING RECORD inte~al, size and number) SIZE JDEPTH S~ (MD) PACKER S~ (MD) 4.5", 13 CR-80Tbg 9942' 9888' 11029 - 11808' MD; 8986 - 8988' ~D; 2-W8" slo~ed liner. ~ 26 ACID, FRACTURE, CEMENT SQUE~E, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED WA 27 PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 5/27/96. (post multilateral leg drilling) Gas ~. Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 5/28/96. 6.5 TEST PERIOD ~ 447 FlowTubing Casing Pressure CALCU~TED OIL-BBL IGAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press 235 - 24-HOUR RATE ~ 1352 604 29 28 CORE DATA Brief description of litholo~, porosi~, fractures, apparent dips and presence of oil, gas or water. Submit core chips. *Note: 11-2,L1 Coil Tubing Multilateral Leg Drilling operations summ~ attached. ORIGINAL JUL i 2 1996 Alagka 011 & 8as Cons. Commission Anch0rag0 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVEF~E SIDE 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 10008' 8414' N/A Shublik 10051' 8453' Top Sadlerochit 10126' 8522' RECEIVED JUL. 1 Summary of 11-2~,L1 ¢oil Tubin~l Multilateral Left Drillin~l Opemlion$. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~"~ "~' ~ Title Enqineerinq Supervisor Date '~- INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska, Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 11-22AL1 DESCRIPTION OF WORK COMPLETED COILED TUBING DRILLED MULTILATERAL 5/6/96: MIRU CTU & PT equipment. 5/7/96: RIH w/nozzle & pumped 180 bbls biozan to kill well. POOH w/CT. RDMO CTU for repairs. $/8/96 - $/9/96: Wait on CTU repairs. RECEIVED ,5/10/96: JUL 1 2. 1996 MIRU CTU. RIH w/nozzle & loaded the wellbore w/Seawater. 5 / 1 I / 9 6 · Ala~k~ 0il & ~,~ C0n~. Commission Anch~'~.g~ Displaced well to biozan. Jetted (;:)OH w/nozzle. MU & RIH w/profile Iocator to locate MLAS. No indication of MLAS seen. POOH w/profile Iocator. 5112196: RDMO CTU for repairs. 5118196: MIRU CTU & PT equipment. RIH w/Iocator & washed 4 passes w/biozan from 10990' to 11045' MD. Found profile indicators & POOH w/BHA. MU & RIH w/whi st~ BHA.. Could not locate whipstock. POOH w/whipstock. 5119196: RIH w/nozzle & reciprocated 100 bbls LSRV biozan from 11105' MD to tubing tail to wash metal junk from well. Circulated biozan from well w/slickwater, then circulated well to FIo-Pro. POOH w/CT. RIH w/whipstock & set whipstock in Iocator at 11017' MD. POOH w/whipstock running tools. MU & RIH w/drilling BHA. 5120196: Tagged whipstock top at 11001' MD, then milled window through the 4.5" liner to 11109' MD. Drilled formation to 11140' MD. Circulated in new FIo-Pro & POOH w/BHA. MU & RIH w/drilling BHA, and continued drilling 3.75" sidetrack hole to 11262' MD. 5/21/96: Drilled to 12386' MD. POOH w/BHA. MU & RIH w/drilling BHA & continued drilling to 11416' MD. 5/22196: Drilled to 11489' MD & stuck pipe. Jarred pipe & circulated Hi-Vis sweep to free pipe. Washed and' reamed tight spots from 11300' to 11439' MD. Drilled to 11550' MD & stuck pipe. Jarred pipe and pumped Hi-Vis sweep to free pipe. POOH w/BHA. RIH w/drilling BHA & drilled to 11657' MD. 5123196: Drilled to TD at 11824' MD. Made wiper passes from TD to tubing tail, then pumped in Hi-Vis sweep & POOH w/BHA. MU 2-7/8" slotted liner assembly. 5124196: RIH w/liner to 11824' MD, putting TOL at 11028' MD. Displaced well w/300 bbls 2% KCI Water, followed by 23 bbls Bleach, followed by 2% KCI displacement. POOH. RIH & retrieved the whipstock. RIH w/nozzle. 5125196: RIH to 11740' MD & jetted CCH through slotted liner w/2% KCI Water. ND, set BPV, & RDMO CTU. Placed the well on production w/gas lift & obtained a valid production test. SPERRY- SUN DRILLING SERVICES .... ANCHORAGE ALASKA PAGE . SHARED SERVICES DRILLING PBU/ll-22ALI 500292203560 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/31/96 DATE OF SURVEY: 052396 MWD SURVEY JOB NUMBER: AK-MW-60057 KELLY BUSHING ELEV. = 55.30 OPERATOR: ARCO ALASKA INC. FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 10999.00 8986.90 8931.60 90 41 S 26.80 W .00 4570.90S 3207.40W 11052.69 8986.24 8930.94 90 41 S 15.81 W 20.47 4620.84S 3226.88W 11084.59 8986.13 8930.83 89 41 S 5.30 W 33.10 4652.16S 3232.71W 11102.59 8986.44 8931.14 88 19 S 1.92 W 20.26 4670.11S 3233.84W 11119.84 8987.14 8931.84 87 0 S 2.82 E 28.50 4687.34S 3233.71W 1402.14 1427.55 1447.61 1460.55 1473.76 11151.92 8988.55 8933.25 87 58 S 7.92 E 16.17 4719.24S 3230.71W 11180.47 8989.62 8934.32 87 42 S 10.21 E 8.07 4747.41S 3226.22W 11211.79 8990.80 8935.50 87 58 S 14.43 E 13.49 4777.98S 3219.54W 11241.57 8992.03 8936.73 87 16 S 18.65 E 14.35 4806.50S 3211.07W 11271.52 8993.50 8938.20 87 5 S 21.11 E 8.23 4834.62S 3200.90W 1500.00 1524.36 1551.97 1579.17 1607.18 11298.89 8994.36 8939.06 89 18 S 22.51 E 9.53 4860.02S 3190.74W 11330.97 8994.18 8938.88 91 19 S 25.68 E 11.72 4889.30S 3177.64W 11364.24 8993.11 8937.81 92 22 S 26.91 E 4.86 4919.11S 3162.91W 11398.17 8991.42 8936.12 93 20 S 30.60 E 11.23 4948.81S 3146.62W 11429.69 8989.10 8933.80 95 5 S 36.22 E 18.64 4975.04S 3129.32W 1633.11 1663.89 1696.14 1729.33 1760.51 11459.77 8986.72 8931.42 93 58 S 41.43 E 17.66 4998.39S 3110.52W 11491.97 8985.87 8930.57 89 2 S 44.27 E 17.69 5021.98S 3088.64W 11521.52 8986.37 8931.07 89 1 S 48.88 E 15.60 5042.28S 3067.19W 11551.97 8986.32 8931.02 91 8 S 50.29 E 8.33 5062.02S 3044.01W 11584.77 8985.54 8930.24 91 34 S 52.75 E 7.62 5082.42S 3018.35W 1790.47 1822.62 %851.99 1882.04 1914.21 11614.94 8984.50 8929.20 92 22 S 54.68 E 6.91 5100.26S 2994.04W 11642.39 8984.44 8929.14 87 53 S 58.02 E 20.36 5115.46S 2971.20W 11674.64 8985.50 8930.21 88 19 S 60.31 E 7.23 5131.98S 2943.53W 11706.94 8986.25 8930.95 89 1 S 61.71 E 4.84 5147.63S 2915.29W 11732.67 8986.49 8931.19 89 54 S 62.59 E 4.84 5159.65S 2892.54W 1943.54 1969.93 2000.44 2030.66 2054.56 11762.27 8986.78 8931.48 88 56 S 64.00 E 5.78 5172.95S 2866.10W 11785.74 8987.40 8932.10 88 4 S 64.88 E 5.27 5183.07S 2844.94W 11824.00 8988.68 8933.38 88 4 S 64.88 E .00 5199.30S 2810.32W 2081.82 2103.25 2138.05 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5910 22 FEET IN. : E C ElY E D VERTICAL SECTION RELATIVE TO WELL HEAD JU[~ 1 2 '199~ VERTICAL SECTION COMPUTED ALONG 139.60 DEG. TIED INTO 11-22A AT 10999.00 ' KICKOFF POINT 11009.00' INTERPOLATED DEPTH 11824.00' tRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/ll-22AL1 500292203560 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/31/96 DATE OF SURVEY: 052396 JOB NUMBER: AK-MW-60057 KELLY BUSHING ELEV. = 55.30 FT. OPERATOR: ARCO ALASKA INC. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10999.00 8986.90 8931.60 4570.90 S 3207.40 W 2012.10 11824.00 8988.68 8933.38 5199.30 S 2810.32 W 2835.32 823.22 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP~-RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/ll-22AL1 500292203560 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/31/96 DATE OF SURVEY: 052396 JOB NUMBER: AK-MW-60057 KELLY BUSHING ELEV. = 55.30 FT. OPERATOR: ARCO ALASKA INC. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANG~ COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10999.00 8986.90 8931.60 4570.90 S 3207.40 W 2012.10 11039.00 8986.41 8931.11 4607.77 S 3222.83 W 2052.59 40.49 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS RECEIVED JUL 1 2 199G Alask~ Oil & S~s Cons. C, ommi~sion Anchorage SPERRY PBU/lt-22AL1 500292203560 052396 NORTH SLOPE BOROUOH -SUN DR ILL I NO HORi ZONTFIL PROJECTION SERV;EES STRRT TVD = 898~.q~ FINISH TVD = 8988.69 SCflLE IS 120 FEET/IN HEST -3520 HOBIZONTRL OIS?LRCEMENT IS 59t0.23 BEPFIRTURE -3400 -3280 -3160 -3040 -2920 -2800 REC~!VED JUL 1 2 1996 11821-t -~500 -4620 -q860 ~ -4980 -5100 -5220 SSOS 3.13 £:\SURVET\I 1-22RL1 SPERRY PBU/11-22AL1 500292203560 052396 NORTH SLOPE BOROUGH -SUN OR ]; LL T NO VERT ICFIL PROJECTION SERVICES STRRT TVO = 898~.~q FINISH TVD = 8988.69 SCALE IS 1~0 FEET/IN 8980 9120 __J ~ 9260 SSOS 3.13 8988.7~ 1Lt~0 ~s4o t6ao ~8~o VEBT I CFIL 5EET I ON 2138.08 FEET FIT S u,o OEO 2L~ HIN E 11182~ tgao ~6o 22~,o C:\SURVE¥\t1-22RL! rll~lll__ll II~r~ SI:~I::I~II--I~S June 17, 1996 AOGCC Howard Oakland 3001 Porcupine Dr Anchorage, AK 99501 Re: Distribution of Survey Data 11-22AL1 Dear Mr. Oakland, Enclosed are two hard copies of the above mentioned file(s). Well ll-22AL1 MWD survey, from tie-in depth 10,999' to interpolated depth 11,824'. Please call me at 563-3256 if you have any questions or concerns. Regard/~ / // Duane Vaagen .... Operations Engineer Attachments. RECE rED dUtq '1 ?' '199g Alaska Oil & 6;~ Cons. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company SPER~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/ll-22AL1 500292203560 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/31/96 DATE OF SURVEY: 052396 MWD SURVEY JOB NUMBER: AK-MW-60057 KELLY BUSHING ELEV. = 55.30 OPERATOR: ARCO ALASKA INC. FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 10999.00 8986.90 8931.60 90 41 S 26.80 W .00 4570.90S 3207.40W 11052.69 8986.24 8930.94 90 41 S 15.81 W 20.47 4620.84S 3226.88W 11084.59 8986.13 8930.83 89 41 S 5.30 W 33.10 4652.16S 3232.71W 11102.59 8986.44 8931.14 88 19 S 1.92 W 20.26 4670.11S 3233.84W 11119.84 8987.14 8931.84 87 0 S 2.82 E 28.50 4687.34S 3233.71W 1402.14 1427.55 1447.61 1460.55 1473.76 11151.92 8988.55 8933.25 87 58 S 7.92 E 16.17 4719.24S 3230.71W 11180.47 8989.62 8934.32 87 42 S 10.21 E 8.07 4747.41S 3226.22W 11211.79 8990.80 8935.50 87 58 S 14.43 E 13.49 4777.98S 3219.54W 11241.57 8992.03 8936.73 87 16 S 18.65 E 14.35 4806.50S 3211.07W 11271.52 8993.50 8938.20 87 5 S 21.11 E 8.23 4834.62S 3200.90W 1500.00 1524.36 1551.97 1579.17 1607.18 11298.89 8994.36 8939.06 89 18 S 22.51 E 9.53 4860.02S 3190.74W 11330.97 8994.18 8938.88 91 19 S 25.68 E 11.72 4889.30S 3177.64W 11364.24 8993.11 8937.81 92 22 S 26.91 E 4.86 4919.11S 3162.91W 11398.17 8991.42 8936.12 93 20 S 30.60 E 11.23 4948.81S 3146.62W 11429.69 8989.10 8933.80 95 5 S 36.22 E 18.64 4975.04S 3129.32W 1633.11 1663.89 1696.14 1729.33 1760.51 11459.77 8986.72 8931.42 93 58 S 41.43 E 17.66 4998.39S 3110.52W 11491.97 8985.87 8930.57 89 2 S 44.27 E 17.69 5021.98S 3088.64W 11521.52 8986.37 8931.07 89 1 S 48.88 E 15.60 5042.28S 3067.19W 11551.97 8986.32 8931.02 91 8 S 50.29 E 8.33 5062.02S 3044.01W 11584.77 8985.54 8930.24 91 34 S 52.75 E 7.62 5082.42S 3018.35W 1790.47 1822.62 1.851.99 1882.04 1914.21 11614.94 8984.50 8929.20 92 22 S 54.68 E 6.91 5100.26S 2994.04W 11642.39 8984.44 8929.14 87 53 S 58.02 E 20.36 5115.46S 2971.20W 11674.64 8985.50 8930.21 88 19 S 60.31 E 7.23 5131.98S 2943.53W 11706.94 8986.25 8930.95 89 1 S 61.71 E 4.84 5147.63S 2915.29W 11732.67 8986.49 8931.19 89 54 S 62.59 E 4.84 5159.65S 2892.54W 1943.54 1969.93 2000.44 2030.66 2054.56 11762.27 8986.78 8931.48 88 56 S 64.00 E 5.78 5172.95S 2866.10W 11785.74 8987.40 8932.10 88 4 S 64.88 E 5.27 5183.07S 2844.94W 11824.00 8988.68 8933.38 88 4 S 64.88 E .00 5199.30S 2810.32W 2081.82 2103.25 2138.05 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5910.22 FEET AT SOUTH 28 DEG. 23 MIN. WEST AT MD = 11824 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 139.60 DEG. TIED INTO 11-22A AT 10999.00' KICKOFF POINT 11009.00' INTERPOLATED DEPTH 11824.00' SPt ~-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/ll-22AL1 500292203560 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/31/96 DATE OF SURVEY: 052396 JOB NUMBER: AK-MW-60057 KELLY BUSHING ELEV. = 55.30 FT. OPERATOR: ARCO ALASKA INC. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10999.00 8986.90 8931.60 11824.00 8988.68 8933.38 4570.90 S 3207.40 W 2012.10 5199.30 S 2810.32 W 2835.32 823.22 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP~~ Y-SUN DRILLING SERVICES ANCHORAGE ALAS~ PAGE 3 SHARED SERVICES DRILLING PBU/ll-22AL1 500292203560 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/31/96 DATE OF SURVEY: 052396 JOB NUMBER: AK-MW-60057 KELLY BUSHING ELEV. = 55.30 FT. OPERATOR: ARCO ALASKA INC. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGLU. JtR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10999.00 8986.90 8931.60 11039.00 8986.41 8931.11 4570.90 S 3207.40 W 2012.10 4607.77 S 3222.83 W 2052.59 40.49 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPERRY-SUN HORIZONTRL PBU/ll-22AL1 500292203560 052396 NORTH SLOPE BOROUGH BRTLLTN6 PROJEET~ON 5ERVTEES STRRT TVO = 898~.q~ FINISH TVD = 8988.69 SCRLE IS 120 FEET/IN HOBIZONTRL OISPLRCEMENT IS 5910.23 OEPFtRTURE NEST -3520 -3400 -3280 -3160 -3040 , -2920 -2800 1182q -~500 -~620 -~7~0 -N860 ~ -~980 -5100 -5220 SSOS 3.13 C:\SURVETXI 1-22RLI SPERRY P8U/ll-22AL1 500292203560 052398 NORTH SLOPE BOROUGH -SUN OR [LL ]' NO VER T I CRL PROJECT 1' ON 5ERVTOES START TVD = 898~.~ FINISH TVO = 8988.69 SCNLE IS 1BO FEET/IN 8980- z o_ L~ 9120- ~' 9260- SSOS 3.13 8988.7, ~54o ~8~o VFBT I CRL SEE T I ON 2~88.08 FKKT BT $ L~O BF6 2L~ MIN ~ 11182q 19~0 ~160 ~2~t0 C: XSURVET\ 11-22AL 1 CONSERVATION COMMISSION ' December 21, 1995 TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Erin M. Oba Engineering Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Prudhoe Bay Unit ll-22AL1 ARCO Alaska, Inc. Permit No. 95-211 Sur. Loc. 4393'NSL, 4590'WEL, Sec. 34, TllN, R15E, UM Btmnhole Loc. 1933'FEL, 4795'FNL, Sec. 4, T10N, R15E, UM Dear Ms. Oba: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The permit is for a new segment from existing well DS 11-22A, Permit No. 95-87, API No. 029-22035-01. Production should continue to be reported as a function of the original well identifier API 029-22035-01. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. Joh~ Chairman BY ORDER OF THE COMMISSION dlf/Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Joan Miller - AOGCC STATE OF ALASKA ALAb;KA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 la. Type of Work Drill __ Redrill X lb. Type of Well Exploratory__ Stratigraphic Test _ Development Oil Re-Entry__ Deepen _ Service _ Development Gas __ Single Zone ~ Multiple Zone _ 2.. Name of Operator 5.Datum Elevation (DF or KB) 1 0. Field and Pool ARCO Alaska, Inc. RKB 55' 3. Address 6. Property Designation P. O. Box 100360, Anchorage, AK 99510-0360 ADL 28328 Prudhoe Bay/Prudhoe Bay Oil 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 4393' NSL, 4590' WEL, Sec 34, T11N, R15E, UM. Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 157' FNL, 2355' WEL, Sec 33, T11N, R15E, UM. 11-22AL1 #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 1933' FEL, 795' FNL, Sec 4, T10N, R15E, UM. December, 1995 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 29' from DS 11-15 11-15 P&A'd 7/90 12105' MD / 9025' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 10999' MD Maximum hole angle 90° Maximum surface 3000 psig At total depth (TVD) 3500 psig 18. Casing program Setting Depth size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.4 L-80 FL4S 1100' 11005' 7731' 12105' 9025 N/A 19. To be completed for Redrill, Re-entry, and Deepen Operations. 0 :-¢., ,¢ 4995 Present well condition summary A .".~.~ [¢ -, ¢~:' ' "' ' Total depth: measured 11760 feet Plugs(measured) ¢-~,~;:,',~:: [,:;; i"~ ~.._'::3 (.:()RS. ~;;;i true vertical 8977 feet ,Ar-*¢ ...... · Effective depth: measured 11760 feet Junk (measured) true vertical 8977 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 112' 2 0" 1900# Poleset 1 1 2' 11 2' Surface 3884' 1 3-3/8" 2160 Sx CS III, 600 Sx G 3939 3506' Production 81 95 9-5/8" 450 Sx G & 439 Sx ARC 8950' 7420' Liner 2951 ' 7" 510 Sx CIG 1 091 0' 8988" Slotted Liner 91 9' 4 - 1/2" Uncemented I 1 760' 8978' Perforation depth: measured Slotted Liner: 10953 - 10993'; 11028 - 11737' true vertical Slotted Liner: 8987 - 8987'; 8987 - 8979' 20. Attachments Filing fee __x Property plat __ BOP Sketch ~ Diverter Sketch _ Drilling program __x Drilling fluid program__ Time vs depth plot_ Refraction analysis _ Seabed report _20 AAC 25.050 requirements _ 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~'~.~ "~Qo ~ Titlle Engineering Supervisor Date Commission Use Only other requirements Conditions of approval Samples required Y e s ,~ N o Mud log required __ Y e s ~ N o Hydrogen sulfide measures ~ Y e s __ N o Directional s.~e~r.~j~8i~¢O~)~ Yes __ N o Required working pressure for BOPE __ 2M; 3 M; "-"r:J'Mc~,U,f_FC~H,~,, -- 0 M; I 5 M~IX/3500 psi for CTU Other: Original $i ned Bg -~ by order of Approved by !}avid W. Johnston Commissioner the commission Date /C~ "'"(~/ ~ Form 10-401 Rev. 7-24-89 Submit in triplica DS 11-22AL1 CT Lateral Leg Drilling and Completion Intended Procedure OBJECTIVE: Drill approximately 1100' MD of formation out of the Multi Lateral Access Sub (MLAS) in the 4-1/2" horizontal liner. INTENDED PROCEDURE: o 3~ . o Cleanout 4-1/2" liner and check orientation of MLAS. MU and run the whipstock assembly. Setting the assembly in the MLAS at- 10999'. MU drilling 3-3/4" BHA on CT and drill - 1100' MD out of the 4-1/2" liner of LR1B formation. MU and run a slotted 2-7/8" FL4S liner in open hole. RIH with pulling tool for whipstock assembly and retrieve whipstock. POOH with CT and RD. Put well on production. 4-1/;?"Camco TRCF-4A SSSV 7" Liner top 4-1/Z" Otis "X" Nipple 7959' 9921' DS 11-22AL1 Proposed Wellbore Sketch MUltilateral Completion 4-1/2" Production Tubing 4-1/2" HES-LB GLM's ~ 9- 5/8" Window @ 81 89' - 8250' 9888' 7" Baker SABL-3 Pkr. 7" Liner set to 90.7° 10856' MD TIW SS HA SS PKR. @ 10910' 4-112" Slotted Liner with 'X' nipple, ported jt and MLAS sub ~-_en= Well Nam~ L~cation ARCO ALAS~% INC. DSl1-22 SIDETRACK IN A~P COORD~. DS 11-15 Side=rack no. I :. Prudhoe Bay Alaska Page 1 ofi 1 Date DEC. 12. 1995 Filenam~ : tl- 22-ST2 No In=erpO~agion Height ci Pla=form Eauum above-Customer Dauum 0.00 ft Height cf Well Da=u= a~ove Platform All TVD$ are relative to =he-Well Datum Level I MD INC DIR ~0907.00 90.7 206. L0999.00 90.7 206. !1000.00 90.7 206. Ll100.00 90.0 194. 11200.00 89.4 181. 1i300.00 88.7 168.6 11400.00 88.2 155.9 i1500.00 87-.7 143.2 11600.00 -87~3 130.5 I1700.00 87.1 117.7 11800.00- 87.0 105.Q 11900.00 87.l 92.3 12000.00 87.3 79.6 12100.00 87.6 66.~ 12138.97' 87.8 61.9 · ss DE~TE_ ASP N/S .- fi ft- ~932.72 5946283.0' $931.60 5946201.0 $931.$8 5946200.0 $930,94 5946106.~ 8931.46 5946007.5 ASP ~/W D'L~G BUILD ft ~/'100 °/100 705228.0 0.0 0.0 705186.5 0.0 0.0 705186.L 12.7 -0.6 7051~1. % 12.7 -0.7 705138.1 12.7 -0.7 ~933.10 5945908.0 ~935.78 5945813.0 8939.39 5945727.0 8943.73 5945654.5 8948.$9 ~945598.5 · 705146.9 12.7 -0.6 · 705177.'I 12.7 -0.6 705227.9 12.7 -0.5 705296.2 12.7 -0.4 · 705~78.7 12.7 -0.2 8953.75 5945562.0 8958.9% 5945547.5 8963.91 5945554.5 8968.42 5945583.0 8970.00 f945600.0 1705471.5 12.7 -0.1 '705570.! 12.7 0.1 · 705669.4 12.7 0.2 705764.9 12.7 0.3 705800.0 12.7 0.4 °/10O 0 -12.7 - 12 ....7 -12.7 -12 ~7 -1.2.7 -:.2.,,7 -12.7 -12 .,7 -~.2.i7 -12'..7 -12.17 of ~o=tom Hole ~-osure PLATFORM c~TrRE Hoie Closure %5987346 f= 6.8" ClienZ : ARCO AJ~KA INC. Page well Name : DS11-22 SIDETRAC~K iN ASP C00~S. Dage D~C. 12. 1995 Loca~icn - DS 11-15 Side~_rack no. 1 File-~-~me : 11-22ST3 : Prudhoe Bay : Alaska No interpolation Height of Planform~a~um'a~mr~ ~dsnomer Datum Height of Well Datum above Platform Datum 0.00 Ail TVDs are relaniue' tO ~he Wel 1 Datum Level 0.00' ~ ft ,MD INC DIR SS DEPTH-- N/S ~/W VS D'LEG BUILD TURN ft deg deg ft f: ft f~ ~/100 :/100 "/100 10907.00 90.7 206.8 8932.72 -4488.8 '316~.9 1921.~ 0.0 0.0 0.0 10999.00 90.7 206.8 8931.60 -4570.9 -3207.4 1946.7 0.C 0.0 0.0 11000.00 90.7 206.7 893!.56 -4571.8 -3207.8 !947.0 12.7 -0.6 -12,7 11100.00 90.0 194.0 8930.94 -4665.4 -3242.5 !985.1 12.7 -0.7 -12.7 1~200.00 89.4 t81.3 893!.a_6 -4764.3 -32~.$ 2042.6 12.7 -0.7 -12.7 11300.00 88.7 168.6 8933.10 -4863.7 -3246.9 2116.6 12.7 -0.6 -12.7 11400.00 88.2 1-~5.9 8935.79 -4958.7'-~216.5 2203.4 12.7 -0.6 -12.7 11500.00 87.7 143.2 8939.40 -5044.6 -3165.9 2299.0 12.7 -0.5 -12.7. 11600.00 87,3 130.4 8943.74 -5117.3 -3097.7 2398.4 12.7 -0.4 -12.7 11700.00 87.1 117.7 8948.61 -5173.2 -~15.1 2496.9 ~2.7 -0.2. -12.7 11800.00 8.7.0 105.0 8953.77 -5209.5 -2~22.3 2589.7 12.7 -0.1 -12.7 11900.00 87.1 92.3 $958.96 -~224.4 -9-823.8 2672.2 12.7 0.1 -12.7 12000.00 87.3 79.5 8'963.93 -$217.3 -~724.3 2740.3 12.7 0.2 '~12.7 1210~.00 87.6 66.8 8968.44 -5188.4'-2~28.9 2790.7 12.7 0.3 -.12.7 12138.42 87.8 ~1.9 8-970.00 -5171.8 -2~94.3 2804.8 12.7 0.4 -12.7 origin of' Bot=om Hole Closur~ _:LATFORM C~rRE . Bottom .Hole Closure 578.6~~=~ 206.6· 'ARCO ALA~i(A ~.N~. 11-22SI1 11-22 , O~lglnal , DS ~I-IS Wollbo~e 7000 ,,, ~ '' -8000-_- , , .... ~ 9000_ ~ 10000 Scale I Inch: 500 I 1 2 -4000 17944' TI~§ Rn S/dalt,acAad /~11 Ver, itcal Section Scale I Inch , lO00f! PLANE OF VERT SECIn ]32.790 C T Drilling Wellhead Detail Methanol Injection Otis 7' WLA Quick Connect ~ ~ I ~Stuffing ~ 7' Riser I I 5-1/8' I1~ ~ BOP Stack 10.000 .~s~ Worldng Pressure Flanged Fire Resistant Kelly Hose To Dual ChokeManifold Ranged Head / / Manual Valve HCR 2' Pump-In Box (~-,-=c~-off), 10,000 psi Working Pressure Cutters o..' Combination Cutter/Blinds Slip / Pi~ rams Drilling: ~ 7-1/16", 5M by 5-1/8'. 10M .,~ Annul~ BOP (Hydr~i!L7-1/16' ID 5,000 psi working 1:3-assure A~nt Guide Flanc Ram Tyoe Dual Gate BOPE~ Manual c~er Hydraulic 7-1/1 ~" E) with Pipe/SliD Rams Manual Master Manua~ Valves (3-1/2' Valves) 9' from GL to top of MV ~,Tubing h an_CZ~T 9-~8' Annulus 13-3/8" Annulus k Fire Resistant Kelly Hose to Flange by Hammer Up 1/4 Turn Valve on DS Hardline 10' from Tree Mud 60/40 I Trplx I Ext. Shop Funl Water Pump Room Pipe rack Boilers Ext. Dowell Drilling Equipment Trailer Ext, Preferred Major Equipment Layout for CT Drilling in DS 11-22AL1 ,,v,-'LL PERMIT CHECKLIST ADMINISTRATION COMPANY /~d-- CD .. UNIT# PROGRAM: exp [] dev ~ redrll~ aery [] ON/OFF SHO~E .~,.,vJ 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............ 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party ............. 10. Operator has appropriate bond in force ........ 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... ENGINEERING , Y N , N N N N N , Y N N APPR DATE 14. Conductor string provided ................ 15. Surface casing protects all known USDWs ......... 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ....... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndn~nt been approved. 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate ........... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate .............. 26. BOFE press rating adequate; test to ~~' ;slg.~' N 27. Choke manifold complies w/API RP~53 (May 84) ...... 28. Work will occur without operation shutdown ....... 29. Is presence of H~S gas probable ............ GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... 31. Seismic analysis of shallow gas zones ......... Data presented on potential overpressure zones ..... Y/N 32. 33. Seabed condition survey (if off-shore) ....... /. 34. Contact name/phone for weekly progress reports . . / . . Y N [exploratory only] GEOLOGY: HOW/lib - A:~FORMS%cheklist rev 11/95 REMARKS ENGINEERING: COMMISSION: Comments/Instructions: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME WELL NAME FIELD NAIVlE BOROUGH STATE API NUMBER REFERENCE NO : D.S. 11-22A L1 .- PRU~HOE BAr' Da : NORTH SLOPE : ALASKA : 50-029-22035-60 : 98585 LIS Tape Verification Listing ~chlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: **** REEL HEADER **** SERVICE NAM~ : EDIT DATE : 98/11/13 ORIGIN : FLIC REEL NAM~ : 98585 CONTINUATION # : PREVIOUS REEL COMFIENT : ARCO ALASKA, PRUDHOE BAY, DS 11-22A L1, API# 50-029-22035-60 **** TAPE HEADER **** SERVICE NAMiE : EDIT DATE : 98/11/13 ORIGIN : FLIC TAPE NAM~ : 98585 CONTINUATION # : 1 PREVIOUS TAPE : COf~W~ENT : ARCO ALASKA, PRUDHOE BAY, DS 11-22A L1, API# 50-029-22035-60 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D.S. 11-22A L1 API NUMBER: 500292203560 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 13-NOV-98 JOB NUFiBER: 98585 LOGGING ENGINEER: VETROMILE OPERATOR WITNESS: WORTHINGTON SURFACE LOCATION SECTION: 34 TOWNSHIP: 1 iN RANGE: 15E FNL: FSL: 4393 FEL: 4590 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 55.30 DERRICK FLOOR: 53.80 GROUND LEVEL: 27. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 8. 500 7. 000 10910.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: DIL LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 1995 LOGGING COMPANY: WESTERN ATLAS BASELINE DEPTH 88888 0 10710 0 10704 0 10702 0 10699 5 10698 0 10692 0 10690 0 10686 5 10680 5 10676.0 10671.5 10671.0 10668.5 10666.0 10663.5 10661.5 10660.5 10660.0 10658.0 10657.0 10654.0 10653.5 10646.5 10636.5 10634.5 10628.0 10622.0 10620.0 10619.5 10616.0 10613.0 10612.0 10611.0 10610.0 10606.0 10599.0 10598.0 10596.5 10582.5 10577.5 10574.0 10561.0 10549.5 10544.0 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTG 88887.0 88887.0 10709.0 10703.0 10697 5 10695 5 10691 5 10688 0 10684 0 10680 0 10675 5 10670 5 10668.5 10666.0 10663.5 10661.0 10659.5 10658.0 10656.5 10653.5 10646.0 10637.0 10634.5 10628.5 10620.0 10616.0 10613.5 10612.0 10610.0 10607.0 10599.5 10596.5 10582.5 10577.5 10574.0 10561.5 10700.5 10671.0 10663.5 10659.5 10653.5 10623.0 10620.0 10610.0 10596.5 10574.0 10548.0 10543.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 10543.0 10530.5 10526.5 10521.5 10515.0 10512.5 10511.5 10508.0 10506.5 10504 0 10494 5 10492 0 10488 5 10488 0 10477 0 10476.5 10467 5 10463 0 10462 5 10459 5 10452 5 10443 0 10439 0 10433 0 10423 0 10418 0 10395 5 10384 0 10383 5 10379 5 10376.5 10361.5 10354.5 10339.0 10335.0 10333.0 10332.0 10313.0 10312.0 10306.5 10301.5 10298.0 10296.5 10293.0 10291.5 10291.0 10289.0 10288.0 10278.0 10272.5 10270.5 10263.5 10259.5 10256.5 10255.5 10253.0 10543.0 10531.0 10526.5 10522.0 10517.0 10513.5 10511.5 10507.0 10507.0 10504.0 10504.0 10495.0 10495.0 10492.0 10489.0 10476.5 10489.0 10478.5 10468.0 10463.0 10462.5 10459.5 10452.5 10452.5 10446.0 10441 0 10433 5 10424 5 10418 5 10396 0 10385 5 10381.5 10377.5 10362.5 10355.5 10339.5 10334.5 10332.0 10314.0 10307.5 10383.0 10334.5 10314.0 10304.5 10292.5 10298.0 10297.0 10294.5 10292.5 10290.5 10289.0 10279.0 10279.0 10274. 0 10271.5 10258.0 10265.0 10260.0 ! 0258.0 10255.0 13-NOV-1998 10:46 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 10251.0 10245.0 10244.0 10242.5 10239.0 10237.5 10237.0 10231.5 10226.5 10224.0 10222 5 10221 0 10220 0 10216 5 10210 0 10204 0 100.0 $ 10252.5 10245.5 10244.0 10241.0 10238.0 10232.5 10225.5 10224.5 t 0222.0 10218.0 10210.0 10206.0 102.0 10245.5 10239.0 10228.5 10222.0 102.0 CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTG DATA AQUIRED ON ARCO ALASKA'S DS 11-22A L1 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE DIL GAMMA RAY, ALSO PASS #1 NPHI AND THE DIL GA~R/zA RAY, CARRYING ALL CNTG CURVES WITH THE NPHI SHIFTS. $ PAGE: **** FILE HEADER **** FILE NAM~ : EDIT . 001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/13 M3LY REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREM~aVT: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10713.0 10200.0 CNTG 10718.0 10200.0 $ CURVE SHIFT DATA - PASS TO PASS (~fEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: PASS NUMBER: BASELINE DEPTH .............. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTG REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTG PU-S 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 ENPH CNTG PU-S 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 CPHI CNTG PU-S 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTG 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTG 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 ENRA CNTG 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTG CPS 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTG CPS 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTG CPS 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) CFTC CNTG CPS 1224651 CNEC CNTG CPS 1224651 CFEC CNTG CPS 1224651 GRCH CNTG GAPI 1224651 TENS CNTG LB 1224651 CCL CNTG V 1224651 GR DIL GAPI 1224651 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10835.500 NRAT. CNTG -999.250 FCNT. CNTG -999.250 CFEC. CNTG -999.250 GR.DIL 61.469 DEPT. 9800.500 NRAT. CNTG -999.250 FCNT. CNTG -999.250 CFEC. CNTG -999.250 GR.DIL 198.866 NPHI.CNTG -999.250 ENPH. CNTG -999.250 CPHI.CNTG CRAT. CNTG -999.250 ENRA.CNTG -999.250 NCNT. CNTG CNTC. CNTG -999.250 CFTC. CNTG -999.250 CNEC. CNTG GRCH. CNTG -999.250 TENS. CNTG -999.250 CCL.CNTG NPHI.CNTG -999.250 ENPH. CNTG -999.250 CPHI.CNTG CRAT. CNTG -999.250 ENP~.CNTG -999.250 NCNT. CNTG CNTC. CNTG -999.250 CFTC. CNTG -999.250 CNEC. CNTG GRCH. CNTG -999.250 TENS.CNTG -999.250 CCL.CNTG -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: FILE HEADER FILE ND?4~ER : 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SO?4~fARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10712.0 10195.0 CNTG 10717.0 10196.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS ~ER: 1 BASELINE DEPTH 88888.0 10711.0 10707.0 10706.5 10699.5 10697.5 10692.0 10690.0 10687.0 10676.5 10674.0 10671 0 10665 0 10657 0 10654 0 10650 5 10647 0 10640 5 10634 5 10632.5 10629.0 10622.5 10620.0 10619.5 10616.0 10612.0 10610.0 10606.5 10599.0 10582.5 10581.5 10574.5 10560.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CITTG .............. 88886.0 88886.0 10705.0 10697.5 10690.5 10688.0 10675.5 10670.5 10663.5 10653.5 10648.5 10634.5 10632.0 10628.5 10620.5 10612.0 10610.0 10582.5 10574.5 10709.0 10705.5 10697.5 10684.5 10674.0 10656.0 10653.5 10647.0 10640.5 10632.5 10623.0 10620.0 10615.0 10610.5 10606.5 10598.0 10580.5 10574.0 10559.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 10549 5 10548 0 10545 0 10543 5 10537 0 10533 5 10530 0 10526 0 10525 5 10519.5 10513.0 10511.0 10508.5 10507.0 10504.5 10504.0 10500.0 10497.0 10495.0 10492.0 10491.0 10489.0 10487.5 10481.0 10477.0 10474.5 10469.5 10465.0 10460.5 10453.5 10450.0 10447.5 10444.5 10441.0 10438.5 10437.0 10434.5 10432.0 10427 0 10421 0 10415 0 10414 5 10409 5 10404 5 10403 5 10393.5 10392.5 10385.5 10383.5 10374.5 10371.0 10366.5 10363.0 10355.0 10352.5 10548.0 10545.0 10543.0 10537.0 10531.0 1052 6.5 10520.0 10511.5 10507.0 10504.0 10497.5 10494.5 10492.0 10489.0 10476.5 10473.5 10469.0 10459.5 10454.0 10450.5 10446.0 10441.0 10434.0 10416.5 10404.5 10385.5 10367.0 10548.0 10532.5 10529.0 10524.0 10509.0 10507.5 10503.5 10500.0 10491.0 10487.0 10483.0 10474.0 10464.5 10447.0 10441.0 10435.5 10431.5 10426.5 10420.5 10413.5 10407.0 10402.0 10392.5 10390.5 10383.0 10374.5 10371.5 10362.5 10353.5 10350.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 10350.0 10342.5 10336.0 10335.5 10334.0 10327.5 10318.0 10317.5 10314.0 10312.0 10310.5 10308.5 10302 5 10302 0 10300 5 10297 5 10294 0 10292 0 10291 0 10290 5 10283 5 10281 0 10279.0 10278.5 10275.5 10275.0 10273.5 10272.5 10272.0 10265.0 10264.0 10257.0 10254.5 10250.5 10249.0 10245.5 10243.0 10241.0 10240.5 10227.5 10225.5 10223.5 10221.5 10212.0 10211.0 10205.0 100.0 $ 10350.5 10336.0 10334.5 10316.0 10311.5 10301.0 10297.0 10290.5 10281.5 10279.5 10275.5 10274.0 10265.5 10255.0 10249.0 10244.0 10241.0 10225.5 10224.5 10210.0 99.0 10341.5 10334.5 10326.5 10317.0 10314.0 10311.5 10308.5 10304.5 10301.5 10294.5 10292.5 10290.5 10282.5 10278.5 10274.5 10272.5 10271.5 10264.5 10258.0 10251.0 10245.5 10240.5 10228.5 10222.5 10213.0 10205.5 100.5 THIS FILE CONTAINS CASED HOLE CNTG PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NPHI PASS #2 AND NPHI PASS #1, CARRYING ALL CNTG CURVES WITH THE NPHI SHIFTS. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 10 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUAiB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTG PU-S 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 ENPH CNTG PU-S 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNTG PU-S 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTG 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTG 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 ENR31 CNTG 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTG CPS 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTG CPS 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTG CPS 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTG CPS 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 CNEC CNTG CPS 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 CFEC CNTG CPS 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTG GAPI 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTG LB 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTG V 1224651 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: DEPT. 10717.000 NPHI.CNTG NRAT. CNTG 3.320 CRAT. CNTG FCNT. CNTG 649.126 CNTC. CNTG CFEC. CNTG 580.192 GRCH. CNTG 32.377 ENPH. CNTG 3.179 ENRA.CNTG 2163.523 CFTC. CNTG -999.250 TENS. CNTG DEPT. 10195.000 NPHI. CNTG -999.250 ENPH. CNTG NRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA. CNTG FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG CFEC. CNTG -999.250 GRCH. CNTG 20.436 TENS. CNTG 28.765 CPHI.CNTG 4.533 NCNT. CNTG 689.918 CNEC. CNTG 3527.000 CCL.CNTG -999.250 CPHI.CNTG -999.250 NCNT. CNTG -999.250 CNEC. CNTG -999.250 CCL.CNTG 32.393 2219.748 2629.730 0.142 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE H~ER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AUJM~ER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUFiBER : 3 DEPTH INCREMENT: O . 5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10711.0 10195.0 CNTG 10717.0 10197.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 12 PASS NTJF~ER : 1 BASELINE DEPTH 88888.0 10711.5 10706.0 10705.5 10699.5 10699.0 10693.0 10690.0 10686.5 10684.0 10677.0 10671.5 10666.0 10664.5 10660.0 10657.5 10654.5 10649.5 10649.0 10638.0 10628.5 10625.5 10623.5 10621.0 10620.5 10616.0 10614.0 10610.0 10608.5 10606.5 10599.5 10596.5 10584.5 10583 0 10574 5 10561 5 10554 5 10550 5 10545 0 10543 5 10540 0 10537.0 10534.0 10531.5 10530.5 10521.5 10520.5 10519.5 10516.5 10516.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTG 88885.0 88886.0 10709.5 10705.5 10702.5 10697.5 10688.0 10681.0 10675.0 10670.5 10663.5 10659.5 10653.5 10648.5 10638.0 10628.5 10626.0 10620.5 10613.5 10610.0 10607.0 10599.5 10596.0 10582.5 10574.0 10561.5 10553.5 10545.0 10543.0 10539.5 10537.0 10531.0 10521.5 10519.5 10517.0 10697.5 10691.0 10684.5 10663.5 10656.0 10653.5 10647.0 10623. 0 10620. 0 10615. 0 10606.5 10582.5 10548.0 10532.5 10529.0 10521.0 10514.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 13 10512.0 10504.5 10497.5 10492 5 10482 5 10477 5 10474 5 10473 5 10467 0 10465 5 10460.5 10453.5 10451.0 10448.0 10443.0 10441.0 10440.5 10436.5 10434.5 10431.0 10424.5 10417.5 10416.5 10405.0 10404.5 10399.0 10397.0 10394.0 10393.5 10386.5 10385.0 10384.0 10380.5 10380.0 10377.5 10377.0 10367.0 10349.5 10342.5 10342.0 10336.0 10334.0 10333.0 10327.5 10327.0 10321.5 10314.0 10307.5 10302.5 10298.0 10292.0 10290.5 10289.0 10282.5 10280.5 10511.5 10504.0 10492.0 10482.5 10476.5 10473.5 10466.5 10460.0 10453.0 10450.5 10441.0 10438.0 10434.0 10415.5 10404.5 10398.5 10396.0 10392.0 10385.5 10381.0 10377.0 10367.0 10342.0 10334.5 10332.0 10327.0 10307. S 10297.0 10290.5 10281.5 10503.5 10497.5 10474.0 10464.5 10452.5 10447.0 10443.0 10440.5 10429.0 10423.5 10415.5 10402.0 10392.5 10386.0 10383.0 10380.0 10375.5 10348.0 10341.0 10334.5 10326.5 10321.0 10314.0 10304.5 10292.5 10289.0 10282.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 14 10279.0 10276.0 10274 0 10273 0 10265 0 10262 5 10259 0 10256 5 10254.5 10253.5 10252.5 10250.5 10245.5 10244.0 10239.5 10239.0 10233.5 10232.5 10229.0 10227.5 10225.5 10214.0 10211.0 10210.5 10205.0 100.0 $ 10279.5 10274.0 10265.5 10262.0 10258.5 10255.0 10252.5 10244.0 10239.0 10232.5 10228.5 10225.5 10213.5 10210.0 10204.0 99.0 10276.0 10272.5 10258.0 10255.0 10251.5 10245.5 10239.0 10234.0 10228.5 10212.0 101.0 REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #3. THE SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #3 AND GRCH PASS #1, ALSO NPHI PASS #3 AND NPHI PASS #1, CARRYING ALL CNTG CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 15 TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE Art¢4~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NOWi~ SAMP ELEM CODE (HEX) O0 000 O0 0 3 1 1 4 68 0000000000 DEPT FT 1224651 NPHI CNTG PU-S 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 ENPH CNTG PU-S 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 CPHI CNTG PU-S 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTG 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTG 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 ENRA CNTG 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTG CPS 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTG CPS 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTG CPS 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTG CPS 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 CNEC CNTG CPS 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 CFEC CNTG CPS 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTG GAPI 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTG LB 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTG V 1224651 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10717.000 NRAT. CNTG 3.000 FCNT. CNTG 645.937 CFEC. CNTG 589.838 NPHI. CNTG 31.093 ENPH. CNTG 27.732 CPHI.CNTG CRAT. CNTG 3.108 ENP~.CNTG 4.423 NCNT. CNTG CNTC. CNTG 2176.207 CFTC. CNTG 711.490 CNEC. CNTG GRCH. CNTG -999.250 TENS. CNTG 3482.000 CCL.CNTG 31.193 2153.571 2608.960 0.151 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 16 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01COt DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTG $ REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES 1,2, &3. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FO~AT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 17 TYPE REPR CODE VALUE 7 65 8 68 O. 5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ NUAiB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 CPHI CNAV PU-S 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 ENPH CNAV PU-S 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 ENRA CNAV 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 CNEC CNAV CPS 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 CFEC CNAV CPS 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTG GAPI 1224651 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10717.000 NPHI.CNAV 30.496 NRAT. CNAV 3.102 CPHI.CNAV CR~T. CNAV 3.075 ENPH. CNAV 28.356 ENRA.CNAV 4.489 NCNT. CNAV FCNT. CNAV 674.202 CNTC. CNAV 2148.580 CFTC. CNAV 710.066 CNEC. CNAV CFEC. CNAV 584.375 GRCH. CNTG -999.250 DEPT. 10200.000 NPHI.CNAV 12.122 NRAT. CNAV 1.938 CPHI.CNAV CRAT. CNAV 1.924 ENPH. CNAV 15.294 ENRA.CNAV 2.964 NCNT. CNAV FCNT. CNAV 1497.574 CNTC. CNAV 2935.231 CFTC. CNAV 1604.500 CNEC. CNAV CFEC. CNAV 1150.270 GRCH. CNTG 17.076 30. 727 2178. 610 2623. 413 13.440 2962. 919 3409. 646 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 18 **** FILE TRAILER **** FILE NA~E : EDIT .004 SERVICE : ?LIC VERSION : O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE N-J~ER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH ........................... CNTG 10766.0 $ LOG HEADER DATA STOP DEPTH 10196.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~ff4A RAY CNTG COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 16-0CT-98 8Cl -205 1130 16-0CT-98 10700.0 10724.0 10196.0 10719.0 1800.0 TOOL NUMBER SGC-SA 8.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 19 DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 10910.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): EPITHERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 6500 TOOL STANDOFF (IN): REM_ARKS: LOG TIED INTO ATLAS CNL DATED 22-JUL-1995 PUMPED 205 BBLS CRUDE TO KNOCK DOWN WELL @ 5 BBL/MIN PUMPED 124 BBLS CRUDE DURING LOGGING @ 1 BBL/MIN PUMPED 10 BBLS DIESEL TO FREEZE PROTECT LOGGED THREE PASSES AT 30 FPM TAGGED PBTD AT 10724' NO FIELD GOC PICK THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 2O TYPE REPR CODE VALUE 3 73 76 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~iE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 ENPH PS1 PU 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 TNPH PS1 PU 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PS1 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 ENRA PS1 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 CFEC PS1 CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 CNEC PS1 CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 RCEF PS1 CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 RCENPS1 CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 RCNTPS1 CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PSI CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PSi CPS 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 NPOR PS1 PU 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PSi LB 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1224651 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10766.000 NPHI.PS1 54.571 ENPH. PS1 38.475 TNPH. PS1 TNRA.PS1 4.396 RTNR.PS1 4.500 ENRA.PS1 5.481 CFEC. PS1 CNEC. PS1 2640.173 RCEF. PS1 487.876 RCEN. PS1 2495.632 RCNT. PS1 RCFT. PS1 487.876 CNTC. PS1 2193.449 CFTC. PSI 507.165 NPOR.PS1 GR.PS1 38.847 TENS. PSI 2375.000 CCL. PS1 0.387 53.096 481.675 2239.474 53.096 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 21 DEPT. 10196.000 NPHI.PS1 TNRA. PS1 1. 902 RTNR. PS1 CNEC. PS1 3339.917 RCEF. PS1 RCFT. PSi 1460. 270 CNTC. PSI GR.PS1 19. 781 TENS.PSI 11.847 ENPH. PS1 2.036 ENRA. PS1 1050.336 RCEN. PS1 2901.467 CFTC. PSi 3618.000 CCL.PS1 16.950 TNPH. PS1 3.175 CFEC. PS1 3133.167 RCNT. PS1 1529.232 NPOR.PS1 -999.250 14.357 1052.095 2903.018 14.866 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE . 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE - 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCRE~_JVT: O. 5000 FILE S~Y VENDOR TOOL CODE START DEPTH CNTG 10751.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : STOP DEPTH 10194.5 16-0CT-98 8Cl -205 1130 16-0CT-98 10700.0 10724.0 10196.0 10719.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 22 LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY CNTG COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 1800.0 TOOL NUMBER ........... SGC-SA CNT-G 8.500 10910.0 CRUDE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): E P I THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 6500 TOOL STANDOFF (IN): REMARKS: LOG TIED INTO ATLAS CNL DATED 22-JUL-1995 PUMPED 205 BBLS CRUDE TO KNOCK DOWN WELL @ 5 BBL/MIN PUMPED 124 BBLS CRUDE DURING LOGGING @ 1 BBL/MIN PUMPED 10 BBLS DIESEL TO FREEZE PROTECT LOGGED THREE PASSES AT 30 FPM TAGGED PBTD AT 10724' NO FIELD GOC PICK THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 23 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 ENPH PS2 PU 1224651 O0 000 O0 0 6 1 i 4 68 0000000000 TNPH PS2 PU 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 ENRA PS2 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 CFEC PS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 CNEC PS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 RCEF PS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 RCEN PS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 NPOR PS2 PU 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1224651 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 24 DEPT. 10751.500 NPHI.PS2 TNRA.PS2 3.419 RTNR.PS2 CNEC.PS2 2466.069 RCEF. PS2 RCFT.PS2 723.048 CNTC. PS2 GR.PS2 71.068 TENS. PS2 DEPT. 10194.500 NPHI.PS2 TNRA.PS2 1.852 RTNR.PS2 CNEC.PS2 3255.364 RCEF. PS2 RCFT.PS2 1674.628 CNTC. PS2 GR.PS2 22.663 TENS. PS2 36.762 ENPH. PS2 3.500 ENRA.PS2 480.550 RCEN. PS2 2530.811 CFTC. PS2 2464.000 CCL.PS2 11.207 ENPH. PS2 1.869 ENRA.PS2 1124.501 RCEN. PS2 2868.839 CFTC. PS2 3577.000 CCL.PS2 35 5 2331 751 0 .425 TNPH. PS2 .198 CFEC.PS2 .060 RCNT. PS2 .635 NPOR.PS2 .193 15.550 2.997 3013.339 1645.387 -999.250 TNPH. PS2 CFEC. PS2 RCNT. PS2 NPOR.PS2 36. 044 474. 442 2583.916 36. 044 12.294 1086.143 3009.994 11.668 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: O . 5000 FILE SU~ff4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH CAPTG 10749.0 10195.0 $ LOG HEADER DATA DATE LOGGED: 16-0CT-98 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 25 SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 8Cl-205 1130 16-0CT-98 10700.0 10724.0 10196.0 10719.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY CNTG COMPENSATED NEUTRON $ TOOL NUMBER SGC - SA CNT-G BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 8.500 10910.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): EP I THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 6500 TOOL STANDOFF (IN): LOG TIED INTO ATLAS CNLDATED22-JUL-1995 PUMPED 205 BBLS CRUDE TO KNOCK DOWN ;fELL @ 5 BBL/MIN PUMPED 124 BBLS CRUDE DURING LOGGING @ 1 BBL/MIN PUMPED 10 BBLS DIESEL TO FREEZE PROTECT LOGGED THREE PASSES AT 30 FPM LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 26 TAGGED PBTD AT 10724' NO FIELD GOC PICK THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN * * NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 ENPH PS3 PU 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 TNPH PS3 PU 1224651 O0 000 O0 0 7 1 I 4 68 0000000000 TNRA PS3 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 ENRA PS3 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 CFEC PS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 CNEC PS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 RCEF PS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 RCEN PS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 RCNTPS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 NPOR PS3 PU 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 27 NA~iE SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) GR PS3 GAPI 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1224651 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 10749.000 NPHI.PS3 54.571 ENPH. PS3 38.454 TNPH. PS3 TNRA.PS3 4.396 RTNR.PS3 4.500 ENRA.PS3 5.479 CFEC. PS3 CNEC. PS3 2599.625 RCEF.PS3 480.550 RCEN. PS3 2457.304 RCNT. PS3 RCFT. PS3 480.550 CNTC. PS3 2159.859 CFTC. PS3 499.549 NPOR.PS3 GR.PS3 103.869 TENS.PS3 2581.000 CCL.PS3 0.119 DEPT. 10195.000 NPHI.PS3 12.685 E1VPH. PS3 16.633 TNPH. PS3 TNRA.PS3 1.968 RTNR.PS3 1.982 ENRA.PS3 3.135 CFEC. PS3 CNEC. PS3 3222.456 RCEF. PS3 1052.621 RCEN. PS3 3044.346 RCNT, PS3 RCFT. PS3 1567.305 CNTC. PS3 2849.288 CFTC. PS3 1539.277 NPOR.PS3 GR.PS3 21.509 TENS.PS3 3485.000 CCL.PS3 -999.250 53.061 474.442 2205.180 53.061 13. 732 1028. 013 2930. 572 13. 553 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE ' FLIC VERSION : O01CO1 DATE : 98/11/13 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NA~E : EDIT DATE : 98/11/13 ORIGIN : FLIC TAPE NAME : 98585 CONTINUATION # : 1 PREVIOUS TAPE COf~ENT : ARCO ALASKA, PRUDHOE BAY, DS 11-22A L1, API# 50-029-22035-60 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-NOV-1998 10:46 PAGE: 28 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/11/13 ORIGIN : FLIC REEL NAME : 98585 CONTINUATION # : PREVIOUS REEL : CO~IT : ARCO ALASKA, PRUDHOE BAY, DS 11-22A L1, API# 50-029-22035-60 _ Subfile 2 is type: TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 3 AK MW 60057 B. JAHN MOONEY ll-22AL1 500292203560 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 28-AUG-96 MWD RUN 4 WORTHINGTON HUPP/BASS MWD RUN 5 WORTHINGTON HUPP/BASS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 6 WORTHINGTON HUPP/BASS 55.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 9.625 8960.0 2ND STRING 7.000 10910.0 3RD STRING 4.500 11760.0 PRODUCTION STRING 3.750 11824.0 REMARKS: MWD - GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. THIS WELL, ll-22AL1, IS REPRESENTED BY RUNS 3 - 6. THE CASING WINDOW POINT FOR THIS WELL IS AT 11009'. ALL RI/NS WERE DIRECTIONAL WITH GAMMA RAY. GAMMA RAY DATA WAS ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTORS (NGP/SGRD). THE WELL WAS DRILLED TO TD AT 11824'. NO DEPTH SHIFTS WERE APPLIED AS THIS LOG IS THE DEPTH REFERENCE FOR THIS WELL (PER DEDE SCHWARTZ & DICK OWENS OF ARCO). ~LE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 10977.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: STOP DEPTH 11797.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 3 11002.0 11140.0 4 11140.0 11385.0 5 11385.0 11544.0 6 11544.0 11824.0 MERGED MAIN PASS. CN WN FN COUN STAT : ARCO ALASKA Nc. : ll-22AL1 : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 21 Tape File Start Depth = 11824.000000 Tape File End Depth = 10977.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5086 datums Tape Subfile: 2 112 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes .ape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE'SIIMMARY VENDOR TOOL CODE START DEPTH GR 10977.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNMOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11113.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MI/D CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 20-MAY-96 MSC 1.32 NGP 2.041 MEMORY 11140.0 11002.0 11140.0 0 87.0 90.7 TOOL NUMBER NGP 159 3.750 11009.0 FLO- PRO 8.80 .0 9.5 40000 6.0 .000 .000 .000 .000 .0 141.6 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 3. CN WN FN COUN STAT : ARCO ALASKA INC. : ll-22AL1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 11200.000000 Tape File End Depth = 10977.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1342 datums Tape Subfile: 3 69 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes i~pe Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11113.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11358.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 22-MAY-96 MSC 1.32 NGP 2.041 MEMORY 11385.0 11140.0 11385.0 0 87.1 92.3 TOOL NUMBER NGP 159 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 11009.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT.MT: FLO- PRO 8.80 .0 9.5 40000 .0 .000 .000 .000 .000 .0 141.6 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 4. CN WN FN COUN STAT : ARCO ALASKA INC. : ll-22AL1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0), 1014 BYTES * Total Data Records: Tape File Start Depth = 11400.000000 Tape File End Depth = 11100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6890 datums Tape Subfile: 4 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~ape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for eaCh bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11354.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11520.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 22-MAY-96 MSC 1.32 NGP 2.041 MEMORY 11544.0 11385.0 11544.0 0 89.0 93.3 TOOL NUMBER NGP 235 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 11009.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS. (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 8.80 .0 9.1 40000 5.4 .000 .000 .000 .000 .0 145.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: ' ' HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 5. CN WN FN COUN STAT : ARCO ALASKA INC. : ll-22AL1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 11600.000000 Tape File End Depth = 11300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3146 datums Tape Subfile: 5 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes _ape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11525.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11797.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 23-MAY-96 MSC 1.32 NGP 2.041 MEMORY 11824.0 11544.0 11824.0 0 88.1 91.1 TOOL NUMBER NGP 235 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.750 11009.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.80 .0 9.1 4OO00 5.4 .000 .000 .000 .000 .0 145.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 6. CN WN FN COUN STAT ARCO ALASKA INC. ll-22AL1 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 8 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 Tape File Start Depth = 11824.000000 Tape File End Depth = 11500.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8838 datums Tape Subfile: 6 71 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes ~ape Subfile 7 is type: LIS 96/ 8/29 01 **** REEL TRAILER **** 8/29 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 29 AUG 96 5:03p Elapsed execution time = 0.99 seconds. SYSTEM RETURN CODE = 0