Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
196-017
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 12-13B Install new tubing Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 196-017 50-029-20614-02-00 11683 Conductor Surface Intermediate Liner Slotted Liner 8714 2644 8774 1810 1332 11683 13-3/8" 9-5/8" 7" 4-1/2" 8714 28 - 2671 26 - 8800 8667 - 10477 10351 - 11683 28 - 2671 26 - 7910 7789 - 8750 8725 - 8714 none 2670 4760 4790 7500 none 4930 6870 6890 8430 10440 - 11660 3-1/2" 9.3# L-80 29 - 9461 , 9471 - 9547 8744 - 8714 Structural 4-1/2" HES TNT , 9363 , 8354 9363 8354 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028330 29 - 8417 , 8423 - 276 529 11286 14788 43 50 0 0 212 283 322-241 , 322-529 13b. Pools active after work:PRUDHOE OIL No SSSV STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations 8465 By Meredith Guhl at 7:40 am, Feb 21, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248), ou=Users Date: 2023.02.17 12:31:33 -09'00' 196-017 Repair Well 322-241 , 322-529 RBDMS JSB 022123 WCB 1-10-2025 PRUDHOE BAY, PRUDHOE OIL Install new tubing Sundry Number DSR-2/22/23 Pull Tubing PBU 12-13B ACTIVITYDATE SUMMARY 4/20/2022 T/I/0 = SI/0/450, Pre Rig Inspection, PPPOT-T (Pass), PPPOT-IC (Fail) PPPOT-IC: 1/2" quarter-turn valves installed on both test ports. Test void was treated with WKM sealant in 1998. Rig up to the lower 1/4 turn valve 0 psi on void, unable to pump returns to the opposite test port. Pressure to 3500 psi multiple times, the pressure would drop to and hold at 2200 psi. (Fail) Rig up to the upper 1/4 turn valve 0 psi on void, unable to pump returns to the opposite test port. Pressure to 3500 psi multiple times, the pressure would drop to and hold at 1300 psi. (Fail) Rig up to test port below the IC pack off primary packing and IC metal seal casing hanger, 0 psi on void. Pressure to 3500 multiple times, the pressure would drop to and hold at 900 psi. (Fail) LDS torque at or over 600 ft-lbs. Did not function LDS. PPPOT-T: Rig up to test port, 0 psi on void, pump hydraulic returns to opposite port. Pressure to 5000 psi with 150 psi loss in the first 15 min and 50 psi loss in the second (Pass) Did not function LDS. 4/22/2022 T/I/O = SSV/10/470. Temp = SI. MIT-OA (PASS ) (pre RWO). No AL. OA FL @ near surface. Stung into 9 5/8" casing hanger metal seal lower body port to monitor pressure during test. Bled OAP from 470 psi to 380 psi (gas). Pressured OAP to 1000 psi w/ 5.8 bbls DSL. Lost 19 psi in 15 min, lost 8 psi in second 15 min (PASS). Test port pressure remained @ 0 psi during MIT-OA. Bled OAP to 300 psi. Stung into IC test port, 0+ psi. Bled test void to 0 psi. Functioned LDS on IC hanger. All LDS were stuck on lower set, got broke free and functioning. 6 LDS on upper set were stuck, got all but one functioning normally. One LDS on the upper set, in the 1:00 position is left in the out position 1/2" will not function normal. need wellhouse platform removed for better access. Torqued to 600 lb/ft. FWHP = SSV/10/300. SV, WV, SSV = C. MV = O. IA & OA = OTG. 17:30. 5/20/2022 T/I/O = 140/40/360. Temp = SI. TBG/IA FLs (Pre CMIT-T x IA). No AL. TBG FL @ 260' (2 bbls). IA FL @ surface. SV, WV, SSV = C. MV = O. IA, OA = OTG. 02:15 5/20/2022 T/I/O = 140/40/360. Temp = SI. Temp = SI. CMIT- TxIA to 3000 psi ( pre-RWO). No AL Pumped 1.8 bbls diesel down IA from 140/40 psi to 300/260 psi. Unable to complete job due to Triplex failure. Final WHP's = 300/260/360. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:30. 5/21/2022 T/I/O = 296/257/366. Temp = SI. CMIT-TxIA to 3000 psi ***FAIL*** (pre-RWO). No AL. TBG & IA FL's @ surface. Pumped 14 bbls down IA unable to pressure past 2730 psi. SD pump and monitor. Begin CMIT @ 2690/2690 psi. 1st 15 min lost 264/263 psi, 2nd 15 min lost 35/35 psi for a total loss of 299/298 psi. Total loss is >10% = Fail. LLR @ 2730 psi ~ 0.25 bpm. Bled TP & IAP from 2391 psi to 300/260 psi in 20 min ( returned 8.5 bbls). Final WHP's = 300/260/370. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00. Daily Report of Well Operations PBU 12-13B Okay, so they're failing the combo probably because of the 7" liner leak that has yet to be discovered. -WCB CMIT-TxIA to 3000 psi ***FAIL*** (pre-RW O). Begin CMIT @ 2690/2690 psi. 1st 15 min lostg@ 264/263 psi, 2nd 15 min lost 35/35 psi for a total loss of 299/298 psi. Total loss is >10% = Fail MIT-OA (PASS ) CMIT- TxIA to 3000 psi (Fail) (pre RW O). PPPOT-T Pressure to 3500 psi multiple times, the pressure would drop to and hold at 2200 psi ) Unable to complete job due to Triplex failure. PPPOT-IC gy Pressure to 5000 psi with 150 psi loss in the first 15 min and 50 psi loss in the second (Pass) Daily Report of Well Operations PBU 12-13B 5/22/2022 T/I/O= 360/335/368 (COMBO) CMIT-TxIA ***FAIL*** Pumped 12 bbls to reach max psi and then dialed in rate for a LLR of ~0.7 bpm @ 3300 psi. Notify WSL and bled back 8.7 bbls. Pad OP notified. Tag Hung. FWHP's = 375/355/400 6/10/2022 T/I/O = 800/780/370 (RWO) Assist PSL with B&F. Pumped 30 bbls 180*F crude down TBG. FWHPs = 1400/1400/500 6/10/2022 ***WELL S/I ON ARRIVAL*** RAN 2.84" NO-GO TO TRDP-4A @2,207' SLM (2,221' MD). RAN 2.84" NO-GO & FLAPPER CHECKER W/ 2.60" PINS BRUSH & FLUSH SSSV RAN 3.5" TRDP-4A LOCKOUT TOOL TO LOCK TRSV @ 2,221' MD DRIFT TO 3-1/2" XXN PLUG @ 9,522' SLM W/ 20' x 2.66" DMY PERF GUNS ***WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED*** 6/12/2022 ***WELL SHUT-IN ON ARRIVAL*** YELLOW JACKET E-LINE OPERATION JOB SCOPE: PERFORM LDL LOG WITH READ LOGGING SERVICES MIRU, MU, RIH READ ACOUSTIC LOGGING TOOL. TOOL LOST COMMUNICATION DURING OPERATIONS, AFTER CHANGING TOOL STRINGS, PROBLEMS CONTINUED WHEN UNDER TENSION. JOB UNFINISHED, CALLED TO ASSIST RIG ON W-01. 6/12/2022 T/I/O= 1300/1250/400 ASSIST E-LINE, PUMPED 27 BBLS CRUDE DOWN IA TO ASSIST E-LINE FWHP= 1700/1700/325 6/14/2022 T/I/O = 1600/1600/300 ASSIST E-LINE FWHP=1600/1600/300 6/14/2022 YELLOW JACKET E-LINE JOB SCOPE: HOIST OPERATIONS WITH READ LDL TOOLS MIRU. MU AND RIH WITH 9/32 LINE; READ ARCHER LDL TOOLS TOOLS TAGGED HIGH AT 2174 FT. UNABLE TO MOVE DOWN HOLE. LOOKS LIKE WE EXITED THE PARTED TUBING @ 1640' MD. PULL TO SURFACE AND RECOVERED TOOLS. WELL SHUT IN AT END OF OPERATIONS. 7/28/2022 Pre-RWO Functioned all tubing hanger LDS out to 4" from IN 3-1/8". Cleaned rust from LDS shanks, lubed, ran LDS until they functioned smoothly. Tightened all LDS and gland nuts. Flushed and packed THA test void with Kroil, pressured test void to 3500 psi and left pressure on it in attempt to force Kroil around tubing hanger body seal area. 8/12/2022 Pre Rig Cerc out T/I/O= 1275/1275/325 Start down TBG with 2 bbls 50/50 Followed by 145 bbls 2% KCL Let sit for 4 hrs and monitor psi Pumped 155 bbls 2%KCL down TBG Tags hung DSO notified of well Status upon departure FWHP= 225/150/400 All CV's= OTG 8/13/2022 T/I/O= 0/0/300 Pumped 2 bbls 50/50 followed by 145 bbls of 2% KCL taking a saple at 100 bbls away Let sit for 5.5 hrs Pumped 155 bbls 2%KCL Taking a sample at 100 bbls away FWHP= 200/200/250 All CV's= OTG Tags Hung DSO notified of well status upon departure 8/13/2022 T/I/O= 0/0/375 TEMP = SI Check pressures on Tbg/IA/OA @ DRIFT TO 3-1/2" XXN PLUG @ 9,522' SLM W/ 20' x 2.66" DMY PERF GUNS It looks like EL will try to find whatever leak (in the 9-5/8" casing, at the 7" LTP, or in the 7" liner) that caused the failing combo. -WCB Start down TBG with 2 bbls 50/50 Followed gg y by 145 bbls 2% KCL E-LINE OPERATION JOB SCOPE: PERFORM LDL LOG Pre Rig Cerc out g E-LINE JOB SCOPE:HOIST OPERATIONS WITH READ LDL TOOLS MIRU. MU AND RIH WITH 9/32 LINE; READ ARCHER LDL TOOLS TOOLS TAGGED HIGH AT 2174 FT. UNABLE TO MOVE DOWN HOLE. LOOKS LIKE WE EXITED THE PARTED TUBING @ 1640' MD. Daily Report of Well Operations PBU 12-13B 8/14/2022 T/I/O= 100/100/200 Pre Rig Cerc out Pumped 2 bbls 50/50 Followed by 145 bbls 2% KCL Let sit for 5 hrs Pumped 154 bbls KCL FWHP= 200/150/300 All CV's= OTG Tags hung DSO notified of well status upon departure 8/14/2022 T/I/O= 225/175/200 TEMP= SI (RWO EXPENSE) Pumped 170 bbls diesel down Tbg taking returns up IA and out FL of 12-12 Hang Tags. DSO notifed of well status, SV,SSV, WV= C MV= O CV's= OTG FWHP's= 175/190/200 8/15/2022 ***WELL S/I ON ARRIVAL*** RAN WELLTECH 238 WCC AND CUT TUBING AT 9471' MD, CCL STOP DEPTH=9453' MD, CCL OFFSET=18' LOG TIED INTO TUBING TALLY DATED 23-FEB-1996. CUTTER STALLED SEVERAL TIMES ON INITIATING. CONTINOUSLY CUT FOR 2.5 MINS AND WEIGHT CHANGE SEEN ON WIRELINE. WELLTECH STALLED 20+ TO VERIFY FULL PENETRATION. MAX CUTTING EXT. VERIFIED AT SURFACE OF 3.42" ON TATTLE TALE. ***READY FOR RIG*** ***NOTE: APPEARS TUBING PARTED AT 1641' BASED OFF CCL*** 8/15/2022 T/I/O= 0/0/200 TEMP= SI Check Well head pressures Well support had well off when arrived. 8/16/2022 Thunderbird 1 RWO (Job Scope: Pull and Fish Tbg, Test casing Run New Completion) Continue Rd @ 02-24. Move to 12-13B and rig up. 8/16/2022 T/I/O= O/O/230 With tree & THA removed, clean void, ring groove & hanger neck, lube O-rings on K plug test dart & install in top of BPV, M/U 10-7/8" Acme landing sub to tubing hanger lift threads 17 RH to full M/U to ensure threads are good, remove L/S, function ULDS one at a time to full out position of 3-78", all functioned properly, but one was tight the entire way out & back in, marked that LDS & gland nut w/ yellow paint, install new BX-160, RDMO while Worley installs BOP 8/16/2022 Set 5" K BPV, RD tree and THA, RU 13" BOP w/ birdbath, Torqued BOP to Spec, Set VR plug in Companion IA, RD Companion IA, Installed Blind flange on Companion IA, Torqued to API Spec. RDMO. 8/17/2022 Thunderbird 1 RWO (Job Scope: Pull and Fish Tbg, Test casing Run New Completion)- Cont from 8/16 WSR Continue Filling stack and prepping for Shell Test BOP. BOPE Test per sundry agreement to 250 psi low and 3,000 psi high. 2- 7/8" & 3-1/2" Test joints. Test with water. Perform Koomy drawdown. Notification of BOPE Test was given at 02:45 7/16/2022. Witnessed waived by Brian Bixby at 0320 on 8/16. Test Gas alarms, Level and flow indicators. MU Otis connection riser for lubricator. MU WS lubricator and Pull Blanking plug and K Valve BPV. Circ 100 bbls Deep Clean 4.75 bpm @ 220 psi. still 5% crude oil . Circ and hesitate to displace migrating hydrocarbons. Shut down and monitor well. Well heaving from crude and gas breaking out. Monitor until well stopped heaving. Well static. Change out Koomy generator. **** In Progress **** 8/17/2022 T/I/O=BVPV/0/0. Pull 5" K BPV through BOP at 150" with 1 5' ext. Final WHP's 0/0/0. RDMO. MU WS lubricator and Pull Blanking plug and K Valve BPV. Circ 100 bblsgg Deep Clean 4.75 bpm @ 220 psi. still 5% crude oil . Circ and hesitate to displace@ migrating hydrocarbons. Shut down and monitor well. Well heaving from crude andggy gas breaking out. Monitor until well stopped heaving. Well static. RAN WELLTECH 238 W CC AND CUT TUBING AT 9471' MD The tubing cut at 9471' MD is shown on the initial WBS of Sundry 322-529. -WCB With tree & THA removed, clean void, ring groove & hanger neck, lube O-rings on K plug test dart & install in top of BPV Thunderbird 1 RWO (Job Scope: Pull and Fish Tbg, Test casing Run New Completion) Daily Report of Well Operations PBU 12-13B 8/18/2022 M/U 5.875" MCA L/J to hanger 14RH, mark L/J @ top flange of BOP, loosen gland nuts, BOLDS to clear bowl measurement of 3-7/8", tighten gland nuts, POOH, L/D hanger & L/J together, measure mark I made on L/J to ULDS profile on tubing hanger (13.00'), call TSB night guy to have him pick up L/J & hanger from location & take to TSB. 8/18/2022 Thunderbird 1 RWO (Job Scope: Pull and Fish Tbg, Test casing Run New Completion)- Cont from 8/17 WSR Change out Koomy generator & function Koomy motor. Make up Landing joint and RH ACME XO to pull hanger. BOLDS, Pull hanger free with 50K, PUW-21K. Pull hanger to the floor. Terminate the control line. Break and LD hanger. Shut the Annular and circulate 25 bbls down the tbg taking returns to the flow back tank. Start POOH wtih 3-1/2 8RD tubing & Control line. Pull 51 Jts and recovered all control line. Jt #52 parted just below collar. Joint #47 was almost completely parted just below the collar. MU Baker BHA #1 5-3/4 Overshot w/ w/ 3.50" grapple and 7.25" shoe, bumper sub, jars OAL 27.2'. TIH on DP. Up Dn Wts 17k/17K, Latch up 1654' Pull 50 K over to ensure latch up. Circ 200 bbls Deep clean and displace w/ hot 1% KCL 4.75 bpm @ 530 psi.Circulate Surf to Surf until returns clean. SD Flow check. Well static. Pull 3-1/2" 8rd tubing with sealed overshot. Pull free with 91K. PUW-80K. POOH racking back 2-7/8" workstring. LD Baker BHA. POOH with 3-1/2" 8Rd tubing. **** In Progress **** 8/19/2022 TB-1 RWO (Job Scope) Pull/Fish Tbg. Test Casing. Run New Completion LD Baker Overshot assy BHA #1. Pull and LD remaining 3-1/2 EUE tbg. MU and RIH w/ 7" GT-Lok RBP 19.91' OAL on 2-7/8" DP.RIH and set Baker RBP at ~9,421' md. Pressure casing to 3000 psi. MIT- Fail. Discuss plan forward with OE. LD single & rack back two stands. Make up RIH & set 9-5/8" storm packer 37' below the Wellhead & test to 3000 psi. Good test 8/20/2022 T/I/O=0/0/0, Open OA valve to ensure no psi., loosen gland nuts on bottom flange of tubing head, BOLDS ~1 full turn to loosen packoff seal, but ensure that upper packoff stays in tubing head when removed, Worley N/D tubing head from intermediate casing head, P/U BOP & tubing head together with crane, J in lower packoff R/T to lower packoff, loosen gland nuts, BOLDS to 3-1/2", P/U & remove lower packoff, clean IC hanger neck & void, emory seal area on hanger neck, M/U packoff R/T to new 1 piece packoff, land on IC hanger, RILDS, torque to 600 ft/lbs, tighten gland nuts, clean ring groove, install new BX-160, grease & Kroil OD seals on packoff, P/U new tubing head, clean ring groove on bottom flange, land tubing head on IC head, Worley torque 13-5/8" connection, R/U test pump, fluid pack packoff test void, test 500 psi/5 min., no psi. loss, test 5k/30 min., good test, bleed off RDMO 8/20/2022 TB-1 RWO (Job Scope) Pull/Fish Tbg. Test Casing. Run New Completion Finish setting 9-5/8" storm Packer COE 35.25' below welll head. Top of PKR 23' below wellhead. . Pressure test to 3000 psi. Good test. Start rigging down the floor and Prepare for Wellhead work. RD scaffold, Fold rig floor up & spot WS Crane. RD Birdbath. ND Tbg spool and remove w/ BOP's, Remove and replace IC pack-off NU new Tbg spool and BOPs. Test IC Void to 5000 psi. Test breaks to 300/3000 psi. Set up scaffold and hooch. Retrieve and LD storm packer. TIH, engage and release Baker Bridge Plug. Attempt to reset. Unable to reset higher. POOH with RBP laying down drill pipe. *** In Progress *** @ Pull 3-1/2" 8rd tubing with sealed overshot. Pullg free with 91K. PUW-80K. POOH racking back 2-7/8" workstring. LD Baker BHA. POOH with 3-1/2" 8Rd tubing. MU and RIHygg w/ 7" GT-Lok RBP 19.91' OAL on 2-7/8" DP.RIH and set Baker RBP at ~9,421' md. Pressure casing to 3000 psi. MIT- Fail. Pull hanger free with 50K, PUW-21K. Pull hanger to the floor )gyg Make up Landing joint and RH ACME XO to pull hangergj gg Start POOH wtih 3-1/2 8RD tubing & Control line. Pull 51 Jts andg recovered all control line. Jt #52 parted just below collar. Joint #47 was almost completely parted just below the collar. () g g Finish setting 9-5/8" storm Packer COE 35.25' below welll head. Top of PKR 23'g below wellhead. . Pressure test to 3000 psi. Good test. Start rigging down the floor and Prepare for Wellhead work. gg Pull and LD remaining 3-1/2 EUE tbg. gg RBP set 50' above tubing, in the 7" liner. "Combo" failed. So they haven't found the casing leak yet. -WCB Daily Report of Well Operations PBU 12-13B 8/21/2022 ***HAL EL ON THUNDERBIRD RIG*** (LEAK DETECTION LOG) MIRU E-LINE LOG READ ARCHER LDL FROM TAG AT 9385' TO SURFACE PUMPING .1BPM AT 2400 PSI NO LEAK FOUND, BUT SUSPECT LEAK BELOW BRIDGE PLUG RDMO E-LINE 8/21/2022 TB-1 RWO (Job Scope) Pull/Fish Tbg. Test Casing. Run New Completion Finish POOH with RBP. Baker Bridge plug not attached to retrieval tool. Spot Halliburton Eline & Rig up Read Acoustic logging tools. RIH on Eline. Make base line pass. Log from 9416' Corrected. Establish LLR .1 BPM @2400 psi. Log to surface @ 30 fpm. Process Log data & send to OE. Log data is not conclusive for leak point. Rig Down E-Line. Make up Baker overshot retrievable tool & single in the hole to re- set the Baker bridge plug. *** In Progress *** 8/22/2022 TB-1 RWO (Job Scope) Pull/Fish Tbg. Test Casing. Run New Completion Continue RIH with Bridge plug retrieval tool. Latch and Re-set RBP at ~9,406' Pressure test casing to 3000 psi. Failed. Lost 850 psi in 15 mins. Set RBP @ 9350'. test to 3000 psi. Lost 450 psi in 5 mins. Unable to reset RBP @ 9050' and near TOL @ 8717'. Pull out of the hole F/8,717' md to surface. RBP not attached. Clean and Clear Rig floor, Spot POL Silckline unit. MU 3.70" LIB with Centralizer, spangs and 8" of 2-1/8" Stem , Zero at Rig floor. RIH, ovserve top of 7" liner at 8,669' slm, Tag top of RBP at 9,362' slm. POOH with LIB. RD Slickline. MU & RIH with ~2200' of 3-1/2" 8Rd EUE Kill string. *** In Progress *** 8/23/2022 M/U hgr to string, RIH, land on 13' RKB mark (ULDS to top flange on BOP) on L/J, verify landed by looking at mark on pup through IA valve, RILDS, tag hgr., torque gland nuts, torque LDS 550 ft/lbs, set 4" H TWC, RDMO 8/23/2022 ***WELL SI ON ARRIVAL*** RUN 3.70" LIB TO RBP @ 9,362' SLM ***WELL LEFT SI*** 8/23/2022 TB-1 RWO (Job Scope) Pull/Fish Tbg. Test Casing. Run New Completion Cont. RIH with LIB on SL., Observe top of 7" liner at 8,669' slm, Tag top of RBP at 9,362' slm. POOH with LIB. RD Slickline. MU & RIH with ~2250' of 3-1/2" 8Rd EUE Kill string. MU Tbg hanger. UP/Dn Wts 25K. Land hanger and RILDS. EOT @ 2265' ORKB. Set TWC. RD and move to L4-03 *** Job Complete for now *** -- Rig will return for leak detect log and completion run. -- 8/25/2022 S/B for vac truck, stack full of fluid. Assist WWS w/ N/D of BOP. Clean void, inspect TBG HGR neck and lift threads. H PLUG #712. Install new BX160. Fill void w/ test oil....cont 8/26... 8/26/2022 Cont from 8/25...N/U Tree. R/U and test void to 500/5000. 500 psi for 10 min good test. 5000 psi for 30 min. 4800 after first 15 min. No loss in final 15 min. Good test. Turn well over to WS to torque tree and pull H plug. 8/26/2022 T/I/O=TWC/0/0. RD BOP's. RU THA & 4" CIW Tree. Torque To API specs. PT tree 500 low 5000 hi (pass). Pull 4" H TWC. RDMO. Final FWP's 10/0/0. 8/28/2022 T/I/O=200/200/6 Assist E-line ( LDL ) Pump 140 bbls diesel as directed by Eline Bled back WHPs FWHPs=200/150/6 gg Eline & Rig up Read Acoustic logging tools. RIH on Eline. Make base linegggg pass. Log from 9416' Corrected. Establish LLR .1 BPM @2400 psi. Log to surface @g@g 30 fpm. Process Log data & send to OE. Log data is not conclusive for leak point.gg Rig Down E-Line. Make up Baker overshot retrievable tool & single in the hole to re-g set the Baker bridge plug. RD and move to L4-03 NO LEAK FOUND, BUT SUSPECT LEAK BELOW BRIDGE PLUG RDMO E-LINE gg Observe top of 7" liner at 8,669' slm, Tag top of RBP atg 9,362' slm. POOH with LIB. RD Slickline. MU & RIH with ~2250' of 3-1/2" 8Rd EUE Kill string. MU Tbg hangergg MIRU E-LINE LOG READ ARCHER LDL FROM TAG AT 9385' TO SURFAC Here the RBP is still in the hole, and they're unsure where the casing leak it. -WCBJob Complete for now ) Assist E-line ( LDL ) Pump 140 bbls diesel as directed by Eline () g g Continue RIH with Bridge plug retrieval tool. Latch and Re-set RBP at ~9,406'gg Pressure test casing to 3000 psi. Failed. Lost 850 psi in 15 mins. Set RBP @ 9350'.g@ test to 3000 psi. Lost 450 psi in 5 mins. Unable to reset RBP @ 9050' and near TOL@ @ 8717'. Pull out of the hole F/8,717' md to surface. RBP not attached. Clean and@ Clear Rig floor, Spot POL Silckline unit. MU 3.70" LIB with Centralizer, spangs and 8"gg of 2-1/8" Stem , Zero at Rig floor. RIH, ovserve top of 7" liner at 8,669' slm, Tag top ofgg RBP at 9,362' slm. POOH with LIB. RD Slickline. MU & RIH with ~2200' of 3-1/2" 8Rd EUE Kill string. Daily Report of Well Operations PBU 12-13B 8/28/2022 ***WELL S/I ON ARRIVAL, DSO NOTIFIED***(ldl) PRESSURE TEST PCE 300/3500H(pass). LOG BASELINE PASS FROM SURFACE TO 9350'. BOL LRS AND ESTABLISH LLR OF 0.5 BPM AND ACTIVATE LEAK FOR 3 HOURS. LOG LEAK DETECT LOG. OBSERVE TEMPERATURE ANOMALY AT 8845' ELMD. ***JOB COMPLETE, WELL SECURE AND TURNED OVER TO DSO*** 8/29/2022 T/I/O = 1690/1630/10. Temp = SI. Bleed Tbg & IA (ops req). AL & FL diconnected. Tbg & IA FL @ surface. Bled IAP to 250 psi to BT in 30 min (Tbg came down to 470 psi during bleed). Tbg psi tracked with IA while bleeding. 30 min monitor. IAP increased 110 psi, Tbg decreased 90 psi. Final WHPs = 380/360/10. SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:00. 11/21/2022 T/I/O = 1120/1050/10. Temp = SI. WHPs (WIE request). No AL or FL. Naked well. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:10 11/22/2022 T/I/O = 1110/1050/10. Temp = SI. IA & T FL (WIE request). No AL. Well is disconnected from the system, no flowline or wellhouse. Integrals installed on IA & OA. IA FL @ surface. T FL @ surface. TP decreased 10 psi overnight. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:00 11/23/2022 T/I/O= 1039/985/0 Circ Out (PRE RIG) Pumped 2 bbls 60/40 meth and 296 bbls Seawater down Tbg, up IA, taking reutrns down 12-12 FL. Bled Tbg/IA to 0 psi. Freeze Protected surface lines and tree w/ 3 bbls DSL. Freeze Protected Flowline on 12-12 w/ 60 bbls crude. Pressured up FL of 12-12 to 1500 psi. Pad Op notified of well status per LRS departure. T/I/O=0/0/0 SV,WV,SSV=C MV=O IA,OA=OTG 11/23/2022 Dispatch to 12-13 @ 20:00. S/B for LRS to RDMO. S/B for WWS to R/D hard line...hard lines are froze up...cont.11/24... 11/24/2022 T/I/O=100/0/0. Pre ASR. Set 4" H BPV # CTS 4-4. preformed LTT (pass). change out with day crew, FWPs=BPV/0/0. 11/24/2022 Work scope: Tubing Swap. ASR brougtht in to finish RWO after Thunderbird ASR Mobilize Rig and components from MPU to PBU. WS Set TWC, ND Tree, NU BOP stack on DS12-13, 11/24/2022 ...cont from 11/23... S/B for WWS to R/D hard line. Check for pressure on void/drain test fluid. Pressure on tree, bleed off (2) buckets of fluid. R/U lubricator to set 4" HCTSBPV #4-4. Ice plug @ TBG HGR. S/B for heat up wellhead. Lubricate in H Plug. S/B for N/D tree, clean void, inspect TBG HGR neck and lift threads. Install 11/25/2022 Work scope: Tubing Swap. ASR brougtht in to finish RWO after Thunderbird Continue from 11/24 ASR Reps; A.Haberthur / C. Huntington 11/25/2022 Pull CTS plug, well not on vac. Sting into 4"H BPV well static, pull BPV from well. Rig circulates one volume, M/U L/J to hanger BOLDS and pull hanger at 19K. Lay hanger down, leave location. 11/30/2022 M/U tbg. hanger to string of 3-1/2" JFE BEAR tubing, drain BOP, RIH, land on RKB, confirm by looking through IA valve @ verification mark on tbg pup, RILDS tag hanger, tighten gland nuts, torque LDS 500 ft/lbs, set 4" H type CTS BPV, S/B for rig ops. ASR Mobilize Rig and components from MPU to PBU. WS Set TWC, ND Tree, NU BOP stack g M/U tbg. hanger to string of 3-1/2" JFE BEAR tubing () LOG BASELINE PASS FROM SURFACE TO 9350'. BOL LRS AND ESTABLISH LLR OF 0.5 BPM AND ACTIVATE LEAK FOR 3 HOURS. LOG LEAK DETECT LOG. OBSERVE TEMPERATURE ANOMALY AT 8845' ELMD. EL found leak @8845' MD. -WCB Removal of the RBP doesn't seem to be mentioned. -WCB Circ Out (PRE RIG) g Work scope: Tubing Swap. ASR brougtht in to finish RWO after Thunderbird Tbg psi tracked with IA while bleeding. Rigg circulates one volume, M/U L/J to hanger BOLDS and pull hanger at 19K. Sting into 4"H BPV well static, pull BPV from wellg Daily Report of Well Operations PBU 12-13B 11/30/2022 Work scope: Tubing Swap. ASR brougtht in to finish RWO after Thunderbird Continue from 11/29 ASR Reps; A.Haberthur / C. Huntington Start Running 3.5" CR13 Completion tubing with HES stacker packer. HES rep 11/30/2022 ** FREEZE PROTECT ** Pumped 170 bbls down TBG taking returns up IA to tiger tank for freeze protect. 12/1/2022 Install plug into CTS BPV, clean void & ring groove, install new BX-160, fill void w/ hydraulic fluid, N/U THA, test 500 psi~3 min., no psi loss, test void 5000 psi/30 min, lost 100 psi in first15 min, lost 0 psi final 15 min., bleed off, pull CTS plug, sting into BPV w/ dry rod, there was psi under BPV, leave BPV to be lubricated out by well 12/1/2022 Work scope: Tubing Swap. ASR brougtht in to finish RWO after Thunderbird Continue from 11/29 ASR Reps; A.Haberthur / C. Huntington Pressure up to 3600 psi to set TNT PKR as directed by HES Rep. MIT-T&IA. PT TBG 12/2/2022 ***POLLARD UNIT 59 WEATHER STANDBY*** TEST WLV'S POST CLOSING ON WIRE, INSTALL .160 MOTORS IN DRUM ***CONTINUED ON 12-3-22*** 12/3/2022 ***CONT FROM 12/3/22 WSR*** CONT WEATHER STANDBY INSTALL .160 DRUM & SPOOL .160 PULLED BALL & ROD FROM 9376' SLM. 12/4/2022 ***WSR CONTINUED FROM 12-3-22*** PULL RK-DGLV FROM STA# 3 @ 5882' MD. PULL RK-DCK FROM STA# 4 @ 3448' MD. SET RK-LGLV IN STA# 4 (3448' MD). SET RK-OGLV IN STA# 3 (5882' MD). 12/4/2022 T/I/O= 274/10/6. LRS 72 Assist S/L (RWO EXPENSE) MIT-T to 3000 psi (3200 psi max applied) FAILED. TBG lost 200 psi in 7 minutes on 3 attempts. IA gained 47 psi during testing. Pumped 3 bbls of crude to achieve test pressure. Bled back 1.3 bbls to Final T/I/O= 273/37/7. 12/5/2022 ***WSR CONTINUED FROM 12-4-22*** STAND BY FOR HIGH WINDS. SET 2.81" PX PLUG IN X-NIPPLE @ 9,390' MD LRS ATTEMPTS MIT-T TO 3,000 psi (fail, see log) 12/5/2022 T/I/O= 397/26/8. LRS 72 Assist Slickline (RWO EXPENSE). MIT-T to 3000 psi FAILED 3 attempts. TBG fell below test pressure in 19 minutes of 3rd test. (3200 psi max applied pressure). Pumped 1 bbl of 40*F crude to achieve test pressure. Pressure up and bleed back as directed while slickline ran D&D hole finder. 12/6/2022 ***WSR CONTINUED FROM 12-5-22*** RAN HOLEFINDER TO 6050' SLM. FAILED TESTS TO 1800' SLM. LRS TO MITT 3000 PSI (FAILED). PULLED RK-LGLV FROM STA# 4 (3448' MD). 12/6/2022 ***job continued from 12-05-22*** Pump 1 bbls crude down tbg for hole finder test. Puessured tbg to 3200 for pressure test tbg fell below 300 psi in 6 min. Bleed back to 500 RDMO. SL on well at departure. 12/13/2022 JOB CANCELLED ASSIST ELINE TFS UNIT #3JOB CANCELLED ASSIST ELINE TFS UNIT #3 MIT-T to 3000 psi FAILED 3 attempts g Pressure up to 3600 psi to set TNT PKR () TBG lost 200 psi in 7 minutes on 3 attempts. IA gained 47 psi during testing. RAN HOLEFINDER TO 6050' SLM. FAILED TESTS TO 1800' SLM. LRS TO MITT 3000 PSI (FAILED). MIT-T to 3000 psi (3200 psi () ( max applied) FAILED) g Start Running 3.5" CR13 Completion tubing with HES stacker packer PULLED BALL & ROD FROM 9376' SLM Daily Report of Well Operations PBU 12-13B 12/14/2022 (ASSIST ELINE) JOB CANCELLED NO FLUID PUMPED 12/16/2022 T/I/O= 100/0/0 Temp= SI Assist Eline as directed Pumped a total of 3 bbls down Tbg while Eline logs unable to keep pump engaged full time bump up psi as needed to keep 3000 psi. CV's= OTG Eline in control of well upon departure. FWHP's= 0/0/0 12/16/2022 ***WELL SHUT IN ON ARRIVAL*** (LDL) MIRU E-LINE PT PCE 300PSI LOW, 3750PSI HIGH LOG BASELINE TEMP PASS SURFACE-9380' 12/18/2022 ****WELL S/I ON ARRIVAL**** MITxT TO 3000PSI(fail) PULL/ RESET RK-DMY GLV IN STA#2 @ 7921' MD MITxT TO 3000PSI (pass, see tab) 12/18/2022 T/I/O= 0/0/0 TEMP=SI (RWO EXPENSE) Assist Sline as directed. Pumped 1 bbl Crude down TBG to pressure up SLine in control of well upon departure 12/19/2022 T/I/O=0/0/0 Assist Slickline ( Stuck on a Plug ) Pressure up and bleed off tbg as SL attempts to shear off plug. FWHPs=0/0/0 12/19/2022 ***JOB CONT, FROM 12/18/2022*** ATTEMPT TO EQUALIZE 3-1/2" XXN-PLUG @ 9534' MD BAIL 2-1/2 GALS FILL/DRILL MUD OFF TOP OF XXN PLUG ATTEMPT TO PULL 3-1/2" XXN-PLUG @ 9534' MD(unable to shear off) 12/20/2022 ***JOB CONT, ON FROM 12/19/2022*** FLOW WELL TO OPEN TOP @ 1BPM (250 bbls total) GS RELEASES OFF PLUG @ 9534' MD RAN 1.5" P.BAILER TO PLUG @ 9534' SLM (Thick Mud) 12/21/2022 T/I/O = 259/1135/11 Temp - SI. Assist SL. Pumped 3 bbls 60/40 and 8 bbls Crude into IA taking returns up TBG to 12-12 FL. *** Job continued to 12-22-2022 *** 12/21/2022 ***JOB CONT, FROM 12/20/2022*** RAN 2-1/4" HYDROSTATIC BAILER TO XXN PLUG @ 9534' MD, BALLER SEVERAL GALS OF THICK DRILL MUD OFF PLUG. RAN 3-1/2" EQ PRONG TO TRY AND EQUALIZE XXN PLUG @ 9534' MD. 12/22/2022 ***JOB CONT, FROM 12/21/2022*** LRS CIRC DOWN IA AND OUT TUBING W/ 496BBLS OF CRUDE. PULL 3-1/2" XXN PLUG @ 9534' MD PULL/SET 3-1/2" XCS IN XNIP @ 9340' MD 12/22/2022 *** Job continued from 12-21-2022 *** Assist SL w/ Circ Out. Pumped 488 bbls Crude into IA tanking returns up TBG to 12-12 FL. FL FP'd w/ 82 bbls Crude. SL in control of well upon departure. FWHP's 1250/0/18 LRS CIRC DOWN IA AND OUT TUBING W / 496BBLS OF CRUDE. PULL 3-1/2" XXN PLUG @ 9534' MD Assist Eline as directed Pumped a total of 3 bbls down Tbg while Eline logs ATTEMPT TO EQUALIZE 3-1/2" XXN-PLUG @ 9534' MD@ BAIL 2-1/2 GALS FILL/DRILL MUD OFF TOP OF XXN PLUG ATTEMPT TO PULL 3-1/2" XXN-PLUG @ 9534' MD(unable to shear off) RAN 2-1/4" HYDROSTATIC BAILER TO XXN PLUG @ 9534' MD, BALLER@ SEVERAL GALS OF THICK DRILL MUD OFF PLUG. RAN 3-1/2" EQ PRONG TO TRY AND EQUALIZE XXN PLUG @ 9534' MD. LOG BASELINE TEMP PASS SURFACE-9380' MIRU E-LINE MITxT TO 3000PSI(fail)() PULL/ RESET RK-DMY GLV IN STA#2 @ 7921' MD MITxT TO 3000PSI (pass, see tab) Date Ops Summary 11/23/2022 Continue to Rig Down on MPU E-35. Lay Down Mast and secure. Transport rig to A-Pad warehouse. Transport Pusher shack / Accumulator to A-Pad warehouse and perform KR Valve Modification Upgrade. Also drained the fluids out of the Centrifugal pumps. Removed the 5000 psi flanges from the BOP's,With Crane support, fly the Rig Floor onto transport trailer. Lift the accumulator hoses into transport basket. N/D BOPs. and N/U Tree. Baker perform final checks on Tech / Cap wire.,Well Head test the Void to 500 psi / 5 min. 5000 psi / 10 min. Good tests. Pull BPV and secure the tree.,Transport the Rig, Pit Module, Rig Floor and Office Trailers to GPB, DS 12-13B. Well Support installing BPV, Nipple Down The tree and Nipple up BOP Stack on well DS 12-13B. 11/24/2022 Assist Well Support on rigging down the lubricator and suck out the Tree.,N/D Tree and Install CTS Plug.,Crane the BOP Stack onto well. Assist the Torque crew with N/U. Had to break the connection between the Mud Cross and Double Gate. Turn the Mud Cross to proper orientation. Also had to install blanking flange to allow room for well hut.,With Crane support, Fly the Well House over well. Also fly the Accumulator hoses and the back staircase into position. Fly the Rig Floor onto the Well Hut. Fly Flow Spools to the Rig Floor. Spot the Pushers Shack and Office Modules.,Spot the Rig Onto the Mud Boat. Level and shim Rig. Continue to work on Rig Acceptance Checklist. Install Winterization around the Rig Equipment.,Raise the Mast and Secure. Install Racking Pins. R/U Glycol Heating system. Remove the Shooting Flange from the Annular Preventer. N/U Spacer and Flow Spools.,Hook up Accumulator Lines. Function Test BOP's. Also Tested and adjusted new Accumulator KR Valve. Good Tests. Take on 40 bbls. of Fresh Water for Testing. and 150 bbls. Seawater for the Work Over.,Open IA to the Tiger Tank. R/U Testing Equipment. Perform Shell Test Good.,Test BOPE as per State Approved Sundry. 250 psi low / 3000 psi high. All tests charted for 5 minutes each. Witness of the test was waived by AOGCC Rep. Kam Stjohn 11/25/2022 Test BOPE as per state approved Sundry. 250 / low, 3000 / high. Annular 250 / low, 2500 / high. All tests charted for 5 min. each. Also tested Gas Alarm System. Witness of the test was waived by AOGCC Rep. Kam StJohn.,R/D Testing equipment. Blow Down all Lines and equipment.,R/U circulating lines to Flow Back Tank. P/U Tee Bar and Pull CTS Plug. Check for pressure and pull BPV.,Small amount of flow from the IA. R/U and circulate down the tubing taking returns to the flow back tank for 100 bbls. Continue to Circulate one volume surface to surface takin returns to the system. 3 BPM at 300 psi. Flow check well static.,M/U landing Joint. BOLDS. Pull hanger to the floor. PUW = 19K. L/D Hanger and Landing Joint.,POOH Laying Down 3.5" EUE Kill String to surface.,Rack & Tally 3.5" Work String. RIH with RBP Retrieving Tool to 2400' at report time. 11/26/2022 Continue RIH w/ 3-1/2 work string from 2,400' to 8697' Tag LT. pick up free. tag again same place. swivel up to rotate and rotate past LT. Break out of joint.,Install kelly valve. Torque to spec. install retention clamp.,RIH to top of RBP at 9391' up weight 90K down weight 67K. Set 10K down and pulled 10K over to verify latch. slacked off to 4 K over, rotated 13 turns to the right. pulled 10 K over. slacked off to 4 K over. rotated 20 rounds to the right. pick up free. pull up 10' and slack off 15' to verify plug release.,R/U circulating lines. CBU 3 BPM at 550 psi. Flow Check Well Static.,POOH slow and easy with RBP F/9391' T/ 6,000' at report time. 11/27/2022 POOH with work string from 6,000' to surface. Lay down RBP,Blow down lines. double check measurements on test packer.,P/u 9-5/8" Test packer. change out tong heads to torque up Bullnose on bottom of test packer. RIH w / test packer. Packer would not go through well head. pull up and inspect packer. screw in with swivel.,Pit generator ran out of fuel. waiting for Colville fueler. fueler showed, fueled and we started pit generator up.,Pull packer up and cycle packer to set position and back to run position. RIH with 9-5/8" Test Packer on 3.5" Work String F/ Surface to packer setting depth at 8600' MD. at report time. 11/28/2022 Set test packer elements @ 8600'. set down 10K to confirm set.,Rig up lines to test. flood lines. prep test chart.,Test casing to 3000psi for 30 min charted. unset packer. monitor well and let elements relax.,POOH w/ 3-1/2 work string and test packer to 8140'.,Rig service. check fluids.,Trouble shoot hydraulic slips. mobilize false bowl and hand slips. insert bowl and slips.,Continue POOH w/ 3-1/2 work string from 8140' to Surface. L/D 9-5/8" Test Packer.,Spot in the Crane and R/D Rig Power Tongs and equipment. R/U Parker Wellbore Casing Equipment. Rack and Tally 3.5" Cr13 Completion as per program detail.,Parker Casing Services hydraulic unit froze up and shut off. Thawed out / Troubleshoot and repaired the hydraulic unit.,PJSM. RIH with 3.5" Cr13, 9.3# Tubing with Stacker Packer Straddle Completion as per program detail. 11/29/2022 Pick up jewelry. Halliburton hand verified packers and X-nipple w/ RHC installed. RIH w/ 3-1/2 completion T/ 1,083',Rig had a trouble code that de-rated the rig. Mobilized mechanic to plug in software. re-gen the rig. clear the codes.,Continue RIH w/ 3-1/2 13Cr 9.2# JFE Bear completion with torque turn. F/ 1,083' T/ 5,900',Continue RIH w/ 3-1/2 13Cr 9.2# JFE Bear completion with torque turn. F/5900 ' T/ 8,690' Tag up on liner top Rotate string 1 1/2 turns work rotation down via reciprocation. Enter liner top DW wt = 55k DW Con't RIH,Continue RIH w/ 3-1/2 13Cr 9.2# JFE Bear completion with torque turn. F/ 8,698' T/ 9,448',Tag tubing stub with overshot, Shear first pins on depth W/ 5k DW, Shear 2nd pins on depth w/ 7k. Tag for NOGO 9,462'-ORKB corrected Preform space out. L/D 3 JTs, #234, 233, & 232. P/U & M/U 9.78', 9.77 PUPs , JT #232. & hanger. P/U wt = 77k S/O wt = 58k,Land hanger w/ Wellhead rep. Align stack for hanger land. Land hanger w/ 58k dw wt. Observed immediate drop in WT upon landing hanger No compression in string RILDS,Pump CI brine down tubing & around straddle packers Pump a total of 100 bbls CI 1% KCL brine chased w/ 82 bbls seawater at 3 BPM 440 PSI,Drop ball & rod, wait 10 min. Pressure up tubing to 500 psi, Walk pressure up to 3600 psi as per packer rep. Hold for 10 mins. Bleed off & prep to test tubing & IA. 11/30/2022 Flood choke manifold and line up to test tubing. Pressure up on tubing to 3100 psi. Tubing had slight bleed off to 2950ps. bled off and came up again to 3200psi. tubing had a slight bleed off. no fluid coming from the IA. decision was made to test Packer and IA. Bled down tubing to 1800 psi and shut in to hold back pressure. pressured up to 3150 psi. good test. bled tubing down to shear GLM. good shear.,Install BPV with dry rod.,Pump freeze protect down tubing past the BPV taking returns out the IA pumping at 1.5 BPM at 250 psi/ pumped 170 BBLs leaving freeze protect at 3450' down tubing and 2200' down backside. FCP 410 psi @ 1.5 BPM,Shut in IA. LRS suck back their lines. Rig down LRS. Rig Released @ 12:00 50-029-20614-02-00API #: Well Name:PBE 12-13B Job Name:225-01656 PBU 12-13B Run tubing with packer 1 Regg, James B (OGC) From:Charles Huntington - (C) <Charles.Huntington@hilcorp.com> Sent:Friday, November 25, 2022 9:50 PM To:DOA AOGCC Prudhoe Bay; Regg, James B (OGC); Brooks, Phoebe L (OGC) Cc:Charles Huntington - (C) Subject:BOPE Test, DS 12-13b, 11/25/2022 Attachments:PBU DS 12-13b BOPE test report 11-25-22.xlsx Please find attached BOPE Test for PBU DS 12‐13b Regards, ASR DSM’s Hilcorp DSM: 907‐685‐1266 Hilcorp Alaska, LLC The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Some people who received this message don't often get email from charles.huntington@hilcorp.com. Learn why this is important CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. PBU 12-13BPTD 1960170 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner:Rig No.:ASR 1 DATE:11/25/22 Rig Rep.:Rig Email: Operator: Operator Rep.:Op. Rep Email: Well Name:PTD #1960170 Sundry #322-529 Operation:Drilling:Workover:x Explor.: Test:Initial:X Weekly:Bi-Weekly:Other: Rams:250/3000 Annular:250/2500 Valves:250/3000 MASP:1506 MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 1 P Permit On Location P Hazard Sec.P Lower Kelly 0 NA Standing Order Posted P Misc.NA Ball Type 1 P Test Fluid Water Inside BOP 1 P FSV Misc 0 NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0 NA Trip Tank NA NA Annular Preventer 1 11"P Pit Level Indicators P P #1 Rams 1 2 7/8" x 5"P Flow Indicator P P #2 Rams 1 Blinds P Meth Gas Detector P P #3 Rams 0 NA H2S Gas Detector P P #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA ACCUMULATOR SYSTEM: Choke Ln. Valves 1 2 1/16"P Time/Pressure Test Result HCR Valves 1 2 1/16"P System Pressure (psi)3000 P Kill Line Valves 2 2 1/16"P Pressure After Closure (psi)1550 P Check Valve 0 NA 200 psi Attained (sec)17 P BOP Misc 0 NA Full Pressure Attained (sec)66 P Blind Switch Covers:All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.):4 / 2225 PSI P No. Valves 16 P ACC Misc 0 NA Manual Chokes 1 P Hydraulic Chokes 1 P Control System Response Time:Time (sec)Test Result CH Misc 0 NA Annular Preventer 19 P #1 Rams 6 P Coiled Tubing Only:#2 Rams 5 P Inside Reel valves 0 NA #3 Rams 0 NA #4 Rams 0 NA Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:0 Test Time:6.0 HCR Choke 1 P Repair or replacement of equipment will be made within days. HCR Kill 0 NA Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 11/23/2022 11:17 Waived By Test Start Date/Time:11/25/2022 6:00 (date)(time)Witness Test Finish Date/Time:11/25/2022 12:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Kam StJohn Hilcorp Test preformed w/ 3-1/2"" test joint. Bottle precharge pressure 1000 psi. C.Greub / J. Werlinger Hilcorp Alaska LLC A.Haberthur / C. Huntington PBU 12-13B Test Pressure (psi): askans-asr-toolpushers@hilcorp.co ans-asrwellsitemanagers@hilcorp Form 10-424 (Revised 08/2022)2022-1125_BOP_Hilcorp_ASR1_PBU_12-13B =========North Slope LLC J. Regg; 12/28/2022 From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:BOP - Hilcorp ASR1 (11-25-2022) Date:Wednesday, December 28, 2022 11:24:24 AM Attachments:2022-1125_BOP_Hilcorp_ASR1_PBU_12-13B.pdf PBU 12-13B (PTD 1960170) Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 1 Prysunka, Anne E (OGC) From:Rixse, Melvin G (OGC) Sent:Monday, November 21, 2022 4:32 PM To:David Bjork (david.bjork@hilcorp.com) Cc:DOA AOGCC Prudhoe Bay Subject:20221121 1630 APPROVED Sundry change PTD 196-017 Sundry 322-529 12-13 RWO Attachments:12-13B RWO tubing swap program resume ops rev1 for ASR.docx; Sundry_322-529_ 090822.pdf Categories:Green Category David, Hilcorp is approved to perform work under Sundry request 322-529 with ASR rig and the BOPE stack as described in the rev1 procedure and the BOPE diagram below: Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). 2 From: David Bjork <David.Bjork@hilcorp.com> Sent: Friday, November 18, 2022 1:49 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Cc: McLellan, Bryan J (OGC) <bryan.mclellan@alaska.gov>; Bo York <byork@hilcorp.com>; Carrie Janowski <Carrie.Janowski@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>; Scott Heim - (C) <Scott.Heim@hilcorp.com>; Jerrod Rose <jrose@hilcorp.com>; Monty Myers <mmyers@hilcorp.com>; George Ivie <givie@hilcorp.com>; Kevin Brackett <Kevin.Brackett@hilcorp.com> Subject: PTD 196-017 Sundry 322-529 12-13 RWO Mel, Unfortunately due to equipment delays we were unable to finish the 12-13 RWO with Thunderbird #1. I have the opportunity to grab the ASR rig on 11/24. I would like to complete the RWO with that unit. No change to the sundried program, just the rig and supporting BOP stack. Attached is the revised program. Let me know if you have any questions. Thanks, Dave Bjork FS1 OE 564-4672o 440-0331c The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe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y Samantha Carlisle at 11:40 am, Sep 07, 2022 'LJLWDOO\VLJQHGE\6WDQ*ROLV '1FQ 6WDQ*ROLV RX 8VHUV 'DWH 6WDQ*ROLV %23(WHVWWRSVL$QQXODUWRSVL '/% ; 0*56(3 GWV Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2022.09.08 08:55:49 -08'00' RBDMS JSB 090822 ZtK WƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ tĞůůEĂŵĞ͗ϭϮͲϭϯW/EƵŵďĞƌ͗ϱϬϬϮϵϮϬϲϭϰϬϮ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/Ŷ ZŝŐ͗dŚƵŶĚĞƌďŝƌĚ ηϭ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϵͬϭϱͬϮϬϮϮ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϭϵϲϬϭϳϬ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ĂǀĞũŽƌŬ ϵϬϳͲϱϲϰͲϰϲϳϮ;KͿ ϵϬϳͲϰϰϬͲϬϯϯϭD ^ĞĐŽŶĚĂůů ŶŐŝŶĞĞƌ͗ƌŝĐŝĐŬĞƌŵĂŶ ϵϬϳͲϱϲϰͲϰϬϲϭ ;KͿ ϯϬϳͲϮϱϬͲϰϬϭϯ D ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗Ϯ͕ϯϴϵ ƉƐŝ Λ ϴ͕ϴϬϬ͛dsϱ͘Ϯ WW'ͮ ^,W^ŽĨĨƐĞƚƐ ϬϲͲϭϴ ϱͬϮϬϭϵ DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϭ͕ϱϬϲƉƐŝ ;ĂƐĞĚŽŶϬ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ >ĂƐƚ ^/ t,W͗ϱϬϬ ƉƐŝ ;dĂŬĞŶ ŽŶ ϯͬϮϭͬϮϮͿ DŝŶ/͗Ϯ͘ϳϱ͟ / yEŶŝƉƉůĞĂƚ Λ ϵ͕ϱϯϰ͛ D DĂdžŶŐůĞ͗ϵϲ ĞŐΛ ϭϬ͕ϳϭϬ͛ ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ ϭϮͲϭϯ ŝƐĂŚŽƌŝnjŽŶƚĂů ^ĂŐ ƉƌŽĚƵĐĞƌĚƌŝůůĞĚŝŶ ϭϵϵϲ ůŽĐĂƚĞĚ ƐŽƵƚŚŽĨƚŚĞ ŐƌĂďďĞŶ ŶĞĂƌƚŚĞ^ϬϭďŽƵŶĚĂƌLJ͘ dŚĞ ǁĞůůǁĂƐĂĨƵůůƚŝŵĞƉƌŽĚƵĐĞƌ ƵŶƚŝů ůĂƚĞ DĂƌĐŚ ϮϬϮϮ ĂĨƚĞƌŝƚĨĂŝůĞĚĂd/&>͘ ZtKǁĂƐƐƚĂƌƚĞĚ͘dŚĞ ƉĂƌƚĞĚƚƵďŝŶŐ ǁĂƐƌĞĐŽǀĞƌĞĚĂŶĚǁĞůůŚĞĂĚƵƉŐƌĂĚĞĚ͘hŶĨŽƌƚƵŶĂƚĞůLJ ǁĞĐŽƵůĚŶŽƚůŽĐĂƚĞĂƉƌŽĚƵĐƚŝŽŶĐĂƐŝŶŐůĞĂŬǁŝƚŚƚŚĞƌŝŐ ŽŶƚŚĞǁĞůů͘ŬŝůůƐƚƌŝŶŐǁĂƐƌĂŶĂŶĚ>>ƉĞƌĨŽƌŵĞĚ͘ůĞĂŬŝŶƚŚĞϳ͟ĚƌŝůůŝŶŐůŝŶĞƌǁĂƐĨŽƵŶĚĂƚϴ͕ϴϰϱĨƚ͘ EŽƚĞƐZĞŐĂƌĚŝŶŐtĞůůďŽƌĞŽŶĚŝƚŝŽŶ͗ x dŚĞ ϵͲϱͬϴ͟ džϳ͟ ƉƌŽĚƵĐƚŝŽŶĐĂƐŝŶŐƉĂƐƐĞĚD/dͲddž/ƚŽϮ͕ϮϱϬ ƉƐŝŐŽŶ ϬϯͬϮϭͬϮϬϮϮ͘ dŚĞŶĨĂŝůĞĚĂD/dͲ ddž/ƚŽϯ͕ϬϬϬͲƉƐŝ͘;>>ZϬ͘ϮϱWDΛϮ͕ϳϯϬͲƉƐŝͿ x ^ĂŐZŝǀĞƌ ƉĞƌĨƐǁŝůůƌĞŵĂŝŶŚLJĚƌĂƵůŝĐĂůůLJŝƐŽůĂƚĞĚƚŚƌŽƵŐŚŽƵƚZt KďLJƚĞƐƚĞĚ yyƉůƵŐ Ăƚ ϵ͕ϱϯϰ͛ D͘ KďũĞĐƚŝǀĞ͗ WƵůůƚŚĞĞdžŝƐƚŝŶŐ ϯ Ъ͟ >ͲϴϬ ƚƵďŝŶŐ ŬŝůůƐƚƌŝŶŐ͘ZĞĐŽǀĞƌƚŚĞϳ͟ZW͘ZƵŶŶĞǁ ϭϯĐŚƌŽŵĞƚƵďŝŶŐ ƐƚƌĂĚĚůĞƉĂĐŬĞƌ ĐŽŵƉůĞƚŝŽŶ͘ ĐŚŝĞǀĞĂƉĂƐƐŝŶŐD/dͲ/ΘD/dͲd͘ WƌĞ^ƵŶĚƌLJtŽƌŬ͗ , ϭ͘ D/dͲddž/ƚŽ ϯ͕ϬϬϬͲƉƐŝ ;&ĂŝůĞĚϬ͘ϮϱďƉŵĂƚϮ͕ϳϯϬƉƐŝͿ Ϯ͘ LJĐůĞ>^͛Ɛ ;KEϴͬϮϲͬϮϮͿ ϯ͘ WWWKdͲd ƚŽϱ͕ϬϬϬͲƉƐŝ ;KEϴͬϮϲͬϮϮͿ ϰ͘ WWWKdͲ/ ƚŽϯ͕ϱϬϬͲƉƐŝ ;KEϴͬϮϬͬϮϮͿ sĂůǀĞ^ŚŽƉͬKƉƐ ϱ͘ ůĞĞĚt,W͛ƐƚŽϬƉƐŝ ϲ͘ ^Ğƚ ϰ͟, dt ϳ͘ EŝƉƉůĞŽǁŶdƌĞĞĂŶĚƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌ͘/ŶƐƉĞĐƚůŝĨƚƚŚƌĞĂĚƐ͘ ^ƵŶĚƌLJWƌŽĐĞĚƵƌĞ;ƉƉƌŽǀĂůƌĞƋƵŝƌĞĚƚŽƉƌŽĐĞĞĚͿ͗ ϴ͘ EhKWĐŽŶĨŝŐƵƌĞĚƚŽƉĚŽǁŶ͕ŶŶƵůĂƌ͕ ϮͲϳͬϴ͟džϱ͟sZƐ͕ůŝŶĚƐĂŶĚĨůŽǁĐƌŽƐƐ͘ ZtK ϵ͘ D/ZhdŚƵŶĚĞƌďŝƌĚηϭZŝŐ͘ ϭϬ͘ dĞƐƚKWƚŽϮϱϬƉƐŝ>Žǁͬϯ͕ϬϬϬƉƐŝ,ŝŐŚ͕ĂŶŶƵůĂƌƚŽϮϱϬƉƐŝ>ŽǁͬϮ͕ϱϬϬƉƐŝ,ŝŐŚ;ŚŽůĚĞĂĐŚƌĂŵͬǀĂůǀĞĂŶĚ ƚĞƐƚĨŽƌϱͲŵŝŶͿ͘ZĞĐŽƌĚĂĐĐƵŵƵůĂƚŽƌƉƌĞͲĐŚĂƌŐĞƉƌĞƐƐƵƌĞƐĂŶĚĐŚĂƌƚƚĞƐƚƐ͘ ͘ WĞƌĨŽƌŵ dĞƐƚƉĞƌ dŚƵŶĚĞƌďŝƌĚηϭKWƚĞƐƚƉƌŽĐĞĚƵƌĞ͘ ͘ EŽƚŝĨLJK'ϮϰŚƌƐŝŶĂĚǀĂŶĐĞŽĨKWƚĞƐƚ͘ ͘ ŽŶĨŝƌŵƚĞƐƚƉƌĞƐƐƵƌĞƐƉĞƌƚŚĞ^ƵŶĚƌLJŽŶĚŝƚŝŽŶƐŽĨĂƉƉƌŽǀĂů͘ ϭ͕ϱϬϲƉƐŝ ůĞĂŬ ŝŶƚŚĞϳ͟ĚƌŝůůŝŶŐůŝŶĞƌǁĂƐĨŽƵŶĚĂƚϴ͕ϴϰϱĨƚ͘ '/% ZtK WƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ ͘ dĞƐƚ ƚŚĞϮͲϳͬϴ͟džϱ͟sZ͛ƐǁŝƚŚ Ă ϮͲϳͬϴ͟ĂŶĚ ϯͲЪ͟ ƚĞƐƚũŽŝŶƚ͘dĞƐƚƚŚĞŶŶƵůĂƌƉƌĞǀĞŶƚĞƌǁŝƚŚĂ ϮͲϳͬϴ͟ ƚĞƐƚũŽŝŶƚ͘ ͘ ^ƵďŵŝƚƚŽK'ĐŽŵƉůĞƚĞĚϭϬͲϰϮϰĨŽƌŵǁŝƚŚŝŶϱĚĂLJƐŽĨKWƚĞƐƚ͘ ϭϭ͘ WƵůů dt͘ hƚŝůŝnjĞĚƌLJƌŽĚƵŶůĞƐƐƉƌĞƐƐƵƌĞŝƐĞdžƉĞĐƚĞĚƚŚĞŶƵƐĞůƵďƌŝĐĂƚŽƌ͘ ϭϮ͘ ŝƌĐŽƵƚǁĞůůďŽƌĞƚŽϭй<ů ŽƌƐĞĂǁĂƚĞƌ͕ŶŽƚĞĐŝƌĐƉŽŝŶƚǁŝůůďĞĨƌŽŵ Ϯ͕ϮϱϬĨƚ͘ EŽƚĞ ϭϰϬďďůƐŽĨĚŝĞƐĞů ǁĂƐƵƐĞĚĨŽƌƚŚĞ>>͘ ϭϯ͘ DhůĂŶĚŝŶŐũŽŝŶƚ͕K>^ĂŶĚƉƵůůŚĂŶŐĞƌƚŽƚŚĞĨůŽŽƌ͘WhǁĞŝŐŚƚƐ ĂƌĞĞdžƉĞĐƚĞĚƚŽďĞ ΕϮϱ< ϭϰ͘ WƵůů ϯ ϭͬϮ͟ƚƵďŝŶŐ ƚŽĨůŽŽƌ͕ĐŝƌĐƵůĂƚĞďŽƚƚŽŵƐƵƉ͘ >ĂLJĚŽǁŶƚƵďŝ ŶŐ͘ ϭϱ͘ WhǁŽƌŬƐƚŝŶŐǁŝƚŚZWƌĞƚƌŝĞǀŝŶŐƚŽŽů͘ZĞĐŽǀĞƌϳ͟ZW ĨƌŽŵϵ͕ϯϲϮĨƚ͘ ϭϲ͘ Z/,ǁŝƚŚϵͲϱͬϴ͛ƚĞƐƚƉĂĐŬĞƌĂƚƐĞƚϴ͕ϲϬϬĨƚ͘dĞƐƚĐĂƐŝŶŐƚŽϯϬϬϬͲƉƐŝ͘>ƉĂĐŬĞƌĂŶĚǁŽƌŬƐƚƌŝŶŐ͘ ϭϳ͘ ZƵŶ ϯ Ъ͟ ϭϯƌ ƚƵďŝŶŐǁŝƚŚƐƚĂĐŬĞƌƉĂĐŬĞƌ ƐƚƌĂĚĚůĞ ĐŽŵƉůĞƚŝŽŶ ĂƐĚĞƚĂŝůĞĚŽŶƉƌŽƉŽƐĞĚƐĐŚĞŵĂƚŝĐ͘ ϭϴ͘ >ĂŶĚ,ĂŶŐĞƌ ĂŶĚƌĞǀĞƌƐĞŝŶĐŽƌƌŽƐŝŽŶŝŶŚŝďŝƚĞĚ ϴ͘ϰƉƉŐϭй<>ŽƌĞƋƵŝǀĂůĞŶƚ ϭϵ͘ ƌŽƉďĂůůĂŶĚƌŽĚ ĂŶĚƐĞƚ ƉĂĐŬĞƌ ǁŝƚŚϯ͕ϱϬϬƉƐŝƉƵŵƉƉƌĞƐƐƵƌĞ͘ ϮϬ͘ WĞƌĨŽƌŵD/dͲdƚŽϯ͕ϬϬϬƉƐŝĂŶĚD/dͲ/ƚŽϯ͕ϬϬϬ ƉƐŝ ĨŽƌϯϬĐŚĂƌƚĞĚŵŝŶƵƚĞƐ͘ Ϯϭ͘ ^ŚĞĂƌǀĂůǀĞ ŝŶƵƉƉĞƌ'>D͘ ϮϮ͘ ^Ğƚdt Ϯϯ͘ ZŝŐĚŽǁŶdŚƵŶĚĞƌďŝƌĚηϭ͘ sĂůǀĞ^ŚŽƉͬKƉƐ ϭ͘ EKW Ϯ͘ EhƚƌĞĞĂŶĚ ƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌ͘ ϯ͘ dĞƐƚďŽƚŚƚƌĞĞĂŶĚƚƵďŝŶŐŚĂŶŐĞƌǀŽŝĚƚŽϱϬϬƉƐŝůŽǁͬϱ͕ϬϬϬƉƐŝŚŝŐŚ͘ ϰ͘ WƵůůdt ĂŶĚĨƌĞĞnjĞƉƌŽƚĞĐƚƚŽΕϮ͕ϬϬϬĨƚǁŝƚŚĚŝĞƐĞů͘ ^ůŝĐŬůŝŶĞ ϭ͘ WƵůůĂůůĂŶĚƌŽĚ ĂŶĚZ,ƉƌŽĨŝůĞ͕ƉƵůůyyƉůƵŐĨƌŽŵ ϵ͕ϱϯϰ͛͘ Ϯ͘ ^Ğƚ'>s͛ƐƉĞƌ'>ŶŐŝŶĞĞƌ ϯ͘ZDKΘƉŽƉǁĞůů͘KďƚĂŝŶK'ǁŝƚŶĞƐƐĞĚ^s^ƚĞƐƚǁŝƚŚŝŶϱĚĂLJƐŽĨƉƵƚƚŝŶŐǁĞůůŽŶůŝŶĞ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ tĞůůďŽƌĞ ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚ tĞůůďŽƌĞ ^ĐŚĞŵĂƚŝĐ ϯ͘ KWƌĂǁŝŶŐ ϰ͘ ^ƵŶĚƌLJZĞǀŝƐŝŽŶŚĂŶŐĞ&Žƌŵ ZtK WƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ tĞůůďŽƌĞ ^ĐŚĞŵĂƚŝĐ /HDNLQOLQHUDW%2 :6 0' ZtK WƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ WƌŽƉŽƐĞĚ tĞůůďŽƌĞ ^ĐŚĞŵĂƚŝĐ ZtK WƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ ZtK KWƐ ZtK WƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ Changes to Approved Sundry Procedure 'DWH 6XEMHFW 6XQGU\ $Q\PRGLILFDWLRQVWRDQDSSURYHGVXQGU\ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ&KDQJHVWRDQDSSURYHG VXQGU\ZLOOEHFRPPXQLFDWHGWRWKH$2*&&E\WKH³ILUVWFDOO´HQJLQHHU$2*&&ZULWWHQDSSURYDORIWKHFKDQJH LVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH 6WHS 3DJH 'DWH 3URFHGXUH&KDQJH +$. 3UHSDUHG %\ ,QLWLDOV +$. $SSURYH G %\ ,QLWLDOV $2*&&:ULWWHQ $SSURYDO 5HFHLYHG 3HUVRQDQG 'DWH $SSURYDO 2SHUDWLRQV0DQDJHU 'DWH 3UHSDUHG 2SHUDWLRQV(QJLQHHU 'DWH 5HJJ-DPHV%2*& )URP%URRNV3KRHEH/2*& 6HQW7XHVGD\$XJXVW$0 7R3%:HOOV5:2:66 &F5HJJ-DPHV%2*& 6XEMHFW5(,QLWLDO7HVW7%:HOO% $WWDFKPHQWV+LOFRUS7KXQGHUELUG[OV[ ƌǀĞůů͕ ƚƚĂĐŚĞĚŝƐĂƌĞǀŝƐĞĚƌĞƉŽƌƚĐŚĂŶŐŝŶŐƚŚĞZŝŐƚŽƌĞĨůĞĐƚ,ŝůĐŽƌƉdŚƵŶĚĞƌďŝƌĚϭ͕ĂŶĚĂĚĚĞĚϬƚŽƚŚĞďůĂŶŬŽŶƚƌŽů^LJƐƚĞŵ ZĞƐƉŽŶƐĞdŝŵĞƐ͘WůĞĂƐĞƵƉĚĂƚĞLJŽƵƌĐŽƉLJ͘ dŚĂŶŬLJŽƵ͕ WŚŽĞďĞ WŚŽĞďĞƌŽŽŬƐ ZĞƐĞĂƌĐŚŶĂůLJƐƚ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ WŚŽŶĞ͗ϵϬϳͲϳϵϯͲϭϮϰϮ CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. &ƌŽŵ͗WtĞůůƐZtKt^^фWtĞůůƐZtKt^^ΛŚŝůĐŽƌƉ͘ĐŽŵх ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϭϳ͕ϮϬϮϮϲ͗ϬϵWD dŽ͗ZĞŐŐ͕:ĂŵĞƐ;K'Ϳфũŝŵ͘ƌĞŐŐΛĂůĂƐŬĂ͘ŐŽǀх͖KK'WƌƵĚŚŽĞĂLJфĚŽĂ͘ĂŽŐĐĐ͘ƉƌƵĚŚŽĞ͘ďĂLJΛĂůĂƐŬĂ͘ŐŽǀх͖ ƌŽŽŬƐ͕WŚŽĞďĞ>;K'ͿфƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗/ŶŝƚŝĂůdĞƐƚdͲϭtĞůůϭϮͲϭϯ WůĞĂƐĞĨŝŶĚĨŽƌŵĂƚƚĂĐŚĞĚ͘ dŚĂŶŬLJŽƵ͕ ƌǀĞůů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ll BOPE reports are due to the agency within 5 days of testing* SSu bm it t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner: Rig No.:Thunderbird 1 DATE: 8/17/22 Rig Rep.: Rig Email: Operator: Operator Rep.: Op. Rep Email: Well Name:PTD #1960170 Sundry #322-241 Operation: Drilling: Workover: x Explor.: Test: Initial: x Weekly: Bi-Weekly: Other: Rams:250/3000 Annular:250/3000 Valves:250/3000 MASP:1506 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 0NA Permit On Location P Hazard Sec.P Lower Kelly 0NA Standing Order Posted P Misc.NA Ball Type 1P Test Fluid Water Inside BOP 1P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13 5/8" x 5M P Pit Level Indicators PP #1 Rams 1 2 7/8'' x 5"P Flow Indicator PP #2 Rams 1 Blinds P Meth Gas Detector PP #3 Rams 0NAH2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NAACCUMULATOR SYSTEM: Choke Ln. Valves 1 3 1/8"P Time/Pressure Test Result HCR Valves 1 3 1/8"P System Pressure (psi)3000 P Kill Line Valves 3 3 1/8"P Pressure After Closure (psi)1650 P Check Valve 0NA200 psi Attained (sec)21 P BOP Misc 0NAFull Pressure Attained (sec)112 P Blind Switch Covers: All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.): 3@ 2183 P No. Valves 8P ACC Misc 0NA Manual Chokes 2P Hydraulic Chokes 0NA Control System Response Time:Time (sec) Test Result CH Misc 0NA Annular Preventer 17 P #1 Rams 6 P Coiled Tubing Only:#2 Rams 6 P Inside Reel valves 0NA #3 Rams 0 NA #4 Rams 0 NA Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:0 Test Time:3.5 HCR Choke 1 P Repair or replacement of equipment will be made within days. HCR Kill 0 NA Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 8/16/22 02:45am Waived By Test Start Date/Time:8/17/2022 1:30 (date) (time)Witness Test Finish Date/Time:8/17/2022 5:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Brian Bixby Hilcorp Test jts 2 7/8 and 3 1/2 Josh Noel Hilcorp Alaska LLC. Anthony Knowles PBU 12-13B Test Pressure (psi): jnoel@thunderbirdfs.com pbrwowss@hilcorp.com Form 10-424 (Revised 08/2022) 2022-0817_BOP_Hilcorp_Thunderbird1_PBU_12-13B 9 +LOFRUS1RUWK6ORSH//& 9 99 9 9 9 9 9 9 9 9 9 9 9 From:Rixse, Melvin G (OGC) To:AOGCC Records (CED sponsored) Subject:20220823 0817 APPROVAL 12-13 RWO PTD 196-017 sundry 322-241 Date:Tuesday, August 23, 2022 8:55:00 AM Subject: RE: [EXTERNAL] 20220822 1707 APPROVAL 12-13 RWO PTD 196-017 sundry 322-241 David, Yes. No 10-403 required for Eline diagnostics. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). From: David Bjork <David.Bjork@hilcorp.com> Sent: Monday, August 22, 2022 6:03 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: Re: [EXTERNAL] 20220822 1707 APPROVAL 12-13 RWO PTD 196-017 sundry 322-241 Thanks Mel, Is it acceptable to complete the e-line work and submit a new 10-403 when we have a defined repair scope? Regards, Dave Sent via the Samsung Galaxy S22+ 5G, an AT&T 5G smartphone Get Outlook for Android From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Sent: Monday, August 22, 2022, 5:08 PM To: David Bjork <David.Bjork@hilcorp.com> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; doa aogcc prudhoe bay CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. <doa.aogcc.prudhoe.bay@alaska.gov> Subject: [EXTERNAL] 20220822 1707 APPROVAL 12-13 RWO PTD 196-017 sundry 322-241 David, Hilcorp is approved to run a kill string with Thunderbird rig, freeze protect, then RDMO on well with PTD196-017. As stated by Hilcorp: work will continue with Eline work to diagnose a casing leak. A new sundry should be created to begin the Eline work and re-MIRU Thunderbird rig to complete tubing swap. Please note the “change to approved program” as the reason for the new 10-403. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). cc. Jim Regg, AOGCC Inspectors From: David Bjork <David.Bjork@hilcorp.com> Sent: Monday, August 22, 2022 4:51 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: 12-13 RWO PTD 196-017 sundry 322-241 Mel, As discussed we are unable to locate the casing leak in 12-13 with the rig. We are isolated to reservoir with a XX plug at 9,534’ The well bore has shown no signs of hydrocarbons after we were able to circulate on bottom. We will set a scoop guide on the tubing stub with slickline and run a 2,000ft 3-1/2” kill string for freeze protect and well monitoring. We will use e-line to diagnose the casing leak and return with a plan to repair in the next 3-4 weeks pending equipment availability. Please let me know if you have any questions. Thanks, Dave Bjork FS1 OE 564-4672o 440-0331c The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rixse, Melvin G (OGC) To:AOGCC Records (CED sponsored) Subject:20220812 1409 Status Update 12-13 RWO sundry # 322-241 PTD 196-017 Date:Friday, August 12, 2022 4:27:18 PM From: David Bjork <David.Bjork@hilcorp.com> Sent: Friday, August 12, 2022 2:08 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: 12-13 RWO sundry # 322-241 PTD 196-017 Mel, Unfortunately 12-13 failed a CMIT-TxIA. We attempted to test to 3,000-psi and found a leak 0.25BPM at 2,730 psi. We were unable to do additional WL diagnostics like a LDL due to the parted tubing. I will add an additional step in the RWO program to get a casing pressure test on the rig using a service packer on the workstring. We will add the additional BOP test to accommodate the 2-7/8” workstring also. Let me know if you have any questions. Regards, Dave Bjork FS1 OE 564-4672o 440-0331c The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate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y Samantha Carlisle at 10:08 am, Apr 27, 2022 'LJLWDOO\VLJQHGE\%R<RUN '1FQ %R<RUN RX 8VHUV 'DWH %R<RUN %23(WHVWWRSVL$QQXODUWRSVL 6)''650*5$35 GWV -/& Jeremy M. Price Digitally signed by Jeremy M. Price Date: 2022.05.02 11:51:36 -08'00' RBDMS SJC 050422 ZtKWƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ tĞůůEĂŵĞ͗ϭϮͲϭϯW/EƵŵďĞƌ͗ϱϬϬϮϵϮϬϲϭϰϬϮ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/Ŷ ZŝŐ͗dŚƵŶĚĞƌďŝƌĚηϭ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϲͬϮϬͬϮϬϮϮ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϭϵϲϬϭϳϬ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ĂǀĞũŽƌŬ ϵϬϳͲϱϲϰͲϰϲϳϮ;KͿ ϵϬϳͲϰϰϬͲϬϯϯϭD ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ZLJĂŶdŚŽŵƉƐŽŶ ϵϬϳͲϱϲϰͲϱϮϴϬ;KͿ ϵϬϳͲϯϬϭͲϭϮϰϬD ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗Ϯ͕ϯϴϵƉƐŝΛϴ͕ϴϬϬ͛dsϱ͘ϮWW'ͮ^,W^ŽĨĨƐĞƚƐϬϲͲϭϴϱͬϮϬϭϵ DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϭ͕ϱϬϲƉƐŝ ;ĂƐĞĚŽŶϬ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ >ĂƐƚ^/t,W͗ϱϬϬƉƐŝ ;dĂŬĞŶŽŶϯͬϮϭͬϮϮͿ DŝŶ/͗Ϯ͘ϳϱ͟/yEŶŝƉƉůĞĂƚΛϵ͕ϱϯϰ͛D DĂdžŶŐůĞ͗ϵϲĞŐΛϭϬ͕ϳϭϬ͛ ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ ϭϮͲϭϯŝƐĂŚŽƌŝnjŽŶƚĂů^ĂŐƉƌŽĚƵĐĞƌĚƌŝůůĞĚŝŶϭϵϵϲůŽĐĂƚĞĚƐŽƵ ƚŚŽĨƚŚĞŐƌĂďďĞŶŶĞĂƌƚŚĞ^ϬϭďŽƵŶĚĂƌLJ͘dŚĞ ǁĞůůǁĂƐĂĨƵůůƚŝŵĞƉƌŽĚƵĐĞƌƵŶƚŝůůĂƚĞDĂƌĐŚϮϬϮϮĂĨƚĞƌŝƚĨĂ ŝůĞĚĂd/&>͘ŝĂŐŶŽƐƚŝĐƐŝŶĚŝĐĂƚĞƚŚĞƚƵďŝŶŐŝƐ ƉĂƌƚĞĚĂƚϭ͕ϲϱϬĨƚ͘tĞǁŝůůŶŽǁƉƵƌƐƵĞĂZtKƚŽƌĞƉůĂĐĞƚŚĞ>ͲϴϬƚƵďŝŶŐ͘ EŽƚĞƐZĞŐĂƌĚŝŶŐtĞůůďŽƌĞŽŶĚŝƚŝŽŶ͗ x dŚĞϵͲϱͬϴ͟džϳ͟ƉƌŽĚƵĐƚŝŽŶĐĂƐŝŶŐƉĂƐƐĞĚD/dͲddž/ƚŽϮ͕ϮϱϬƉƐŝŐŽŶϬϯͬϮϭͬϮϬϮϮ͘ x ^ĂŐZŝǀĞƌƉĞƌĨƐǁŝůůƌĞŵĂŝŶŚLJĚƌĂƵůŝĐĂůůLJŝƐŽůĂƚĞĚƚŚƌŽƵŐŚŽƵƚZtKďLJƚĞƐƚĞĚyyƉůƵŐĂƚϵ͕ϱϯϰ͛D͘ KďũĞĐƚŝǀĞ͗ WƵůůƚŚĞĞdžŝƐƚŝŶŐϯЪ͟>ͲϴϬƚƵďŝŶŐŽƵƚŽĨƚŚĞǁĞůůĂŶĚƌĞƉůĂĐĞǁŝƚŚϭϯĐŚƌŽŵĞƚƵďŝŶŐ͘ĐŚŝĞǀĞĂƉĂƐƐŝŶŐD/dͲ/Θ D/dͲd͘ WƌĞ^ƵŶĚƌLJtŽƌŬ͗ , ϭ͘ D/dͲddž/ƚŽϯ͕ϬϬϬͲƉƐŝ Ϯ͘ LJĐůĞ>^͛Ɛ ϯ͘ WWWKdͲdƚŽϱ͕ϬϬϬͲƉƐŝ ϰ͘ WWWKdͲ/ƚŽϯ͕ϱϬϬͲƉƐŝ ^ůŝĐŬůŝŶĞ ϱ͘ >ŽĐŬŽƉĞŶ^^^^s sĂůǀĞ^ŚŽƉͬKƉƐ ϲ͘ ůĞĞĚt,W͛ƐĂŶĚĐŽŶƚƌŽůůŝŶĞƚŽϬƉƐŝ ϳ͘ ^ĞƚϱͲϭͬϴ͟<WůƵŐWs ϴ͘ EŝƉƉůĞŽǁŶdƌĞĞĂŶĚƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌ͘/ŶƐƉĞĐƚůŝĨƚƚŚƌĞĂĚƐ͘/ŶƐƚĂůůƚĞƐƚĚĂƌƚ͘ ^ƵŶĚƌLJWƌŽĐĞĚƵƌĞ;ƉƉƌŽǀĂůƌĞƋƵŝƌĞĚƚŽƉƌŽĐĞĞĚͿ͗ ϵ͘ EhKWĐŽŶĨŝŐƵƌĞĚƚŽƉĚŽǁŶ͕ŶŶƵůĂƌ͕ϮͲϳͬϴ͟džϱ͟sZƐ͕ůŝŶĚƐĂŶĚĨůŽǁĐƌŽƐƐ͘ ZtK ϭϬ͘ D/ZhdŚƵŶĚĞƌďŝƌĚηϭZŝŐ͘ ϭϭ͘ dĞƐƚKWƚŽϮϱϬƉƐŝ>Žǁͬϯ͕ϬϬϬƉƐŝ,ŝŐŚ͕ĂŶŶƵůĂƌƚŽϮϱϬƉƐŝ>ŽǁͬϮ͕ϱϬϬƉƐŝ,ŝŐŚ;ŚŽůĚĞĂĐŚƌĂŵͬǀĂůǀĞĂŶĚ ƚĞƐƚĨŽƌϱͲŵŝŶͿ͘ZĞĐŽƌĚĂĐĐƵŵƵůĂƚŽƌƉƌĞͲĐŚĂƌŐĞƉƌĞƐƐƵƌĞƐĂŶĚĐŚĂƌƚƚĞƐƚƐ͘ ͘ WĞƌĨŽƌŵdĞƐƚƉĞƌdŚƵŶĚĞƌďŝƌĚηϭKWƚĞƐƚƉƌŽĐĞĚƵƌĞ͘ ͘ EŽƚŝĨLJK'ϮϰŚƌƐŝŶĂĚǀĂŶĐĞŽĨKWƚĞƐƚ͘ ͘ ŽŶĨŝƌŵƚĞƐƚƉƌĞƐƐƵƌĞƐƉĞƌƚŚĞ^ƵŶĚƌLJŽŶĚŝƚŝŽŶƐŽĨĂƉƉƌŽǀĂů͘ ZtKWƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ ͘ dĞƐƚƚŚĞϮͲϳͬϴ͟džϱ͟sZ͛ƐǁŝƚŚĂϯͲЪ͟ƚĞƐƚũŽŝŶƚ͘dĞƐƚƚŚĞŶŶƵůĂƌƉƌĞǀĞŶƚĞƌǁŝƚŚĂϯͲϭͬϮ͟ƚĞƐƚ ũŽŝŶƚ͘ ͘ tĞǁŝůůŶŽƚƉƌŽĂĐƚŝǀĞůLJƚĞƐƚǁŝƚŚϮͲϳͬϴ͟ƚĞƐƚũŽŝŶƚƐ͘/ĨĂǁŽƌŬƐƚƌŝŶŐƌƵŶŝƐƌĞƋƵŝƌĞĚƐƚŽƉĂŶĚƚĞƐƚ sZ͛ƐĂŶĚĂŶŶƵůĂƌǁŝƚŚĂϮͲϳͬϴ͟ƚĞƐƚũŽŝŶƚ͘ &͘ ^ƵďŵŝƚƚŽK'ĐŽŵƉůĞƚĞĚϭϬͲϰϮϰĨŽƌŵǁŝƚŚŝŶϱĚĂLJƐŽĨKWƚĞƐƚ͘ ϭϮ͘ WƵůůůĂŶŬŝŶŐƉůƵŐĂŶĚ<Ws͘hƚŝůŝnjĞĚƌLJƌŽĚƵŶůĞƐƐƉƌĞƐƐƵ ƌĞŝƐĞdžƉĞĐƚĞĚƚŚĞŶƵƐĞůƵďƌŝĐĂƚŽƌ͘ ϭϯ͘ ŝƌĐŽƵƚǁĞůůďŽƌĞƚŽϭй<ůŽƌƐĞĂǁĂƚĞƌ͕ŶŽƚĞĐŝƌĐƉŽŝŶƚǁŝůůďĞĨƌŽŵϭϲϱϬĨƚ͘ZĞƉĞĂƚĂƐŶĞĐĞƐƐĂƌLJŝĨ ĚŝĞƐĞůŽƌŚLJĚƌŽĐĂƌďŽŶƐĂƌĞƉƌĞƐĞŶƚ͘ ϭϰ͘ ZhĐŽŶƚƌŽůůŝŶĞƐƉŽŽůĞƌ͘ ϭϱ͘ DhůĂŶĚŝŶŐũŽŝŶƚŽƌƐƉĞĂƌ͕K>^ĂŶĚƉƵůůŚĂŶŐĞƌƚŽƚŚĞĨůŽŽ ƌ͘WhǁĞŝŐŚƚƐĂƌĞĞdžƉĞĐƚĞĚƚŽďĞΕϭϰ< ϭϲ͘ WƵůůϯϭͬϮ͟ƚƵďŝŶŐƚŽĨůŽŽƌ͕ĐŝƌĐƵůĂƚĞďŽƚƚŽŵƐƵƉ͘>ĂLJĚŽǁŶƚƵďŝŶŐ͘ ϭϳ͘ DhĂƉĂĐŬŽĨĨŽǀĞƌƐŚŽƚĂŶĚZ/,ŽŶƚŚĞŽůĚϯͲϭͬϮ͟ƚƵďŝŶŐ͘'ƌĂ ďĨŝƐŚĂŶĚWhƚŽΕϳϱ<ĂďŽƵƚϭϬ<ŽǀĞƌ͘ ĐĂůŝƉĞƌŝŶĚŝĐĂƚĞƐůĞƐƐƚŚĂŶϯϬйǁĂůůůŽƐƐ͘ ϭϴ͘ ZhůŝŶĞǁŝƚŚůŝŶĞǁŝƉĞƌĂŶĚĐƵƚƚŚĞƚƵďŝŶŐĂƚϵ͕ϰϯϯϰĨƚ͕ϰĨƚĚŽǁŶŽŶƚŚĞĨŝƌƐƚĨƵůůũŽŝŶƚĂďŽǀĞƚŚĞƉĂĐŬĞƌ ĂƐƐĞŵďůLJ͘ ϭϵ͘ ZͲůŝŶĞĂŶĚĐŝƌĐŽƵƚǁĞůůďŽƌĞƚŽϭй<ůŽƌƐĞĂǁĂƚĞƌ͘ ϮϬ͘ WƵůůĂŶĚ>ƚƵďŝŶŐƚŽƚŚĞƐĂĨĞƚLJǀĂůǀĞ͘ Ϯϭ͘ DhƐƚŽƌŵƉĂĐŬĞƌĂŶĚŚĂŶŐŽĨĨƌĞŵĂŝŶŝŶŐƚƵďŝŶŐ͘dĞƐƚƐƚŽƌŵƉĂĐŬĞƌƚŽϯ͕ϬϬϬͲƉƐŝ͘ ϮϮ͘ EKWĂŶĚƌĞƉůĂĐĞ/ƉĂĐŬŽĨĨĂŶĚŝŶƐƚĂůůŶĞǁƚƵďŝŶŐƐƉŽŽů͘dĞƐƚ/ƉĂĐŬŽĨĨƚŽϯ͕ϱϬϬͲƉƐŝ͘EhKW͕ /ŶƐƚĂůůƚĞƐƚƉůƵŐĂŶĚƚĞƐƚKWďƌĞĂŬƚŽϯ͕ϬϬϬͲƉƐŝ͘ Ϯϯ͘ WƵůůƐƚŽƌŵƉĂĐŬĞƌĂŶĚ>ƌĞŵĂŝŶŝŶŐƚƵďŝŶŐƐƚƌŝŶŐ͘ Ϯϰ͘ ZƵŶϯЪ͟ϭϯƌƚƵďŝŶŐǁŝƚŚƐƚĂĐŬĞƌƉĂĐŬĞƌĐŽŵƉůĞƚŝŽŶĂƐĚĞƚĂŝůĞĚŽŶƉƌŽƉŽƐĞĚƐĐŚĞŵĂƚŝĐ͘ Ϯϱ͘ >ĂŶĚ,ĂŶŐĞƌĂŶĚƌĞǀĞƌƐĞŝŶĐŽƌƌŽƐŝŽŶŝŶŚŝďŝƚĞĚϴ͘ϰƉƉŐϭй<>ŽƌĞƋƵŝǀĂůĞŶƚ Ϯϲ͘ ƌŽƉďĂůůĂŶĚƌŽĚĂŶĚƐĞƚƉĂĐŬĞƌǁŝƚŚϯ͕ϱϬϬƉƐŝƉƵŵƉƉƌĞƐƐƵƌĞ͘ Ϯϳ͘ WĞƌĨŽƌŵD/dͲdƚŽϯ͕ϬϬϬƉƐŝĂŶĚD/dͲ/ƚŽϯ͕ϬϬϬƉƐŝĨŽƌϯϬĐŚĂƌƚĞĚŵŝŶƵƚĞƐ͘ Ϯϴ͘ ^ŚĞĂƌǀĂůǀĞŝŶƵƉƉĞƌ'>D͘ Ϯϵ͘ ^Ğƚdt ϯϬ͘ ZŝŐĚŽǁŶdŚƵŶĚĞƌďŝƌĚηϭ͘ sĂůǀĞ^ŚŽƉͬKƉƐ ϭ͘ EKW Ϯ͘ EhƚƌĞĞĂŶĚƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌ͘ ϯ͘ dĞƐƚďŽƚŚƚƌĞĞĂŶĚƚƵďŝŶŐŚĂŶŐĞƌǀŽŝĚƚŽϱϬϬƉƐŝůŽǁͬϱ͕ϬϬϬƉƐŝŚŝŐŚ͘ ϰ͘ WƵůůdtĂŶĚĨƌĞĞnjĞƉƌŽƚĞĐƚƚŽΕϮ͕ϬϬϬĨƚǁŝƚŚĚŝĞƐĞů͘ ^ůŝĐŬůŝŶĞ ϭ͘ WƵůůĂůůĂŶĚƌŽĚĂŶĚZ,ƉƌŽĨŝůĞ͕ƉƵůůyyƉůƵŐĨƌŽŵϵ͕ϱϯϰ͛͘ Ϯ͘ ^Ğƚ'>s͛ƐƉĞƌ'>ŶŐŝŶĞĞƌ ϯ͘ZDKΘƉŽƉǁĞůů͘KďƚĂŝŶK'ǁŝƚŶĞƐƐĞĚ^s^ƚĞƐƚǁŝƚŚŝŶϱĚĂLJƐŽĨƉƵƚƚŝŶŐǁĞůůŽŶůŝŶĞ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ tĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ ϯ͘ KWƌĂǁŝŶŐ ϰ͘ ^ƵŶĚƌLJZĞǀŝƐŝŽŶŚĂŶŐĞ&Žƌŵ ZtKWƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ tĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ ZtKWƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ WƌŽƉŽƐĞĚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ ZtKWƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ ZtKKWƐ ZtKWƌŽĐĞĚƵƌĞ t>>͗ϭϮͲϭϯ Wd͗ϭϵϲϬϭϳϬ Changes to Approved Sundry Procedure 'DWH 6XEMHFW 6XQGU\ $Q\PRGLILFDWLRQVWRDQDSSURYHGVXQGU\ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ&KDQJHVWRDQDSSURYHG VXQGU\ZLOOEHFRPPXQLFDWHGWRWKH$2*&&E\WKH³ILUVWFDOO´HQJLQHHU$2*&&ZULWWHQDSSURYDORIWKHFKDQJH LVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH 6WHS 3DJH 'DWH 3URFHGXUH&KDQJH +$. 3UHSDUHG %\ ,QLWLDOV +$. $SSURYH G %\ ,QLWLDOV $2*&&:ULWWHQ $SSURYDO 5HFHLYHG 3HUVRQDQG 'DWH $SSURYDO 2SHUDWLRQV0DQDJHU 'DWH 3UHSDUHG 2SHUDWLRQV(QJLQHHU 'DWH • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Wednesday, November 1, 2017 2:18 PM To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL;AK, OPS FS1 Field OTL;AK, OPS FS1 OSM;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Dean,James A; G GPB FS1 Drillsites; Oestgaard, Finn; Regg,James B (DOA);Wallace, Chris D (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J;AK, GWO Well Integrity Well Information Subject: OPERABLE: Producer 12-13 (PTD# 1960170) Outer Annulus Diagnostics Test Passed All, Producer 12-13 (PTD#1960170)was made under evaluation on 10/13/17 for having sustained outer annulus casing pressure above NOL. Diagnostic work summarized below did not indicate any OA integrity issues. The pressure spike observed on 10/12/17 is believed to have been caused by thermal fluid expansion that went undetected due to an issue with the annulus gauge. At this time the well is reclassified as Operable. Work Completed: 1. Wellhead: Positive Pressure Packoff Test—Passed to 3,500psi on 10/17/17 2. Fullbore: MIT-OA-Passed to 1,200psi on 10/18/17 3. Wellhead: Leak Path Eval—Passed on both primary and secondary seals 4. Downhole diagnostics:Outer Annulus Repressurization Test—Passed over 11 day period with 13psi/day build up rate to a stable 150psi Please reply if in conflict, Joshua Stephens Well Integrity Engineer 7:EB l' Office: 907-659-8110 Cell: 907-341-9068 W From: AK, GWO Well Integr u•ineer Sent: Friday, October 13, 2017 1:53 • To: AK, GWO Well Integrity Engineer; AK, OPS • ' ialists; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, OPS FS1 Field OTL; AK, OPS FS1 OSM; AK, RES GPB East e •it Engr; AK, RES GPB West Wells Opt Engr; 1 i • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Friday, October 13, 2017 1:53 PM To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL;AK, OPS FS1 Field OTL;AK, OPS FS1 OSM;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Dean,James A; G GPB FS1 Drillsites; Oestgaard, Finn; Regg,James B (DOA);Wallace, Chris D (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: UNDER EVLAUATION: Producer 12-13 (PTD# 1960170) Sustained outer annulus casing pressure above NOL All, Producer 12-13 (PTD# 1960170)was reported to have sustained outer annulus casing pressure above NOL on 10/12/17. The pressure were reported to be T/I/O=209/1350/1484psi. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. Downhole diagnostics: Outer annulus repressurization test. 2. Wellhead: Leak pack eval of the inner casing hanger, re-energize secondary seals. 3. Well Integrity Engineer: Additional diagnostics as needed. Please reply if in conflict with proposed plan. Matt Ross (Alternate: Josh Stephens) Well Integrity Engineering Office 907-659-8110 Cell 907-980-0552 Harmony 4530 SCANNED = : 2MI8 gyro ate Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston. Texas 77043 713!461-3146 Fa x: 7 ~ 3/4G 1-0920 APR ~ ~ 248 SURVEY REPORT BP Drill Site 12 #12-13 Prudhoe Bay, AK AK0308G_112 1 Mar 2008 • Serving the be~crldwide Eneroy !i ~dus!ry with Prer~ion Si.~rvey Llsi~ E~nie,?faiicn • • gyro data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 April 3, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: Driill Sine 12, Well #12-13 Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, F `~~ Rob Shoup North American Regional Manager RS:tf Serving the Worldwide Energy industry with Precision Survey Enstrumes~tation A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) Lease: Drill Site 12 Well: 12-13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G -112 Run Date: 11 Mar 2008 Surveyor: Steve Thompson Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.216918 deg. N Longitude: 148.412162 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location • ~J Horizontal Coordinates Calculated from Well Head Location BP Exploration (Alaska) Lease: Drill Site 12 Well: 12-13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE BEARING deg. min. DOGLEG SEVERITY deg./ 25 ft. VERTICAL CLOSURE DEPTH DIST. AZIMUTH feet feet deg. 0.00 0.00 0.00 N 0 0 E 0.00 0.00 --------------------------------------------------------------------------------------------------------------------------------- 0 - 9650 FT. RATE GYROSCOPIC CONTINUOUS SURVEY RUN IN 4-1/2" TUBING MEASURED DEPTHS REFERENCED TO 40.02 FT. ABOVE THE BASE FLANGE SCREWS. BASE FLANGE OF 34.5 FT. AMSL AND RKB OF 74.52 FT. AMSL ------------------------------------------------------------=-------------------------------------------------------------------- 0.0 0.0 HORIZONTAL COORDINATES feet 0.00 N 0.00 E ------------------------------- i 100.00 0.32 32.17 N 32 10 E 0.08 100.00 0.3 32.2 0.24 N 0.15 E 200.00 0.05 153.78 S 26 13 E 0.09 200.00 0.5 36.1 0.43 N 0.32 E 300.00 0.02 0.48 N 0 29 E 0.02 300.00 0.5 39.2 0.41 N 0.34 E 400.00 0.11 78.40 N 78 24 E 0.03 400.00 0.6 43.8 0.45 N 0.43 E 500.00 0.23 93.56 S 86 26 E 0.03 500.00 0.9 57.8 0.46 N 0.72 E 600.00 0.28 99.88 S 80 7 E 0.01 600.00 1.2 71.0 0.40 N 1.17 E 700.00 0.36 100.92 S 79 5 E 0.02 700.00 1.7 80.1 0.30 N 1.71 E 800.00 0.39 92.77 S 87 14 E 0.02 799.99 2.4 84.6 0.22 N 2.36 E 900.00 0.48 101.61 S 78 23 E 0.03 899.99 3.1 87.7 0.12 N 3.11 E 1000.00 0.53 105.81 S 74 11 E 0.02 999.99 4.0 91.3 0.09 S 3.97 E 1100.00 0.36 110.24 S 69 46 E 0.04 1099.98 4.7 93.9 0.32 S 4.71 E 1200.00 0.32 166.93 S 13 4 E 0.08 1199.98 5.1 97.9 0.70 S 5.07 E 1300.00 0.47 184.36 S 4 22 W 0.05 1299.98 5.3 105.2 1.38 S 5.10 E 1400.00 0.87 218.83 S 38 50 W 0.14 1399.97 5.2 117.4 2.38 S 4.59 E 1500.00 1.07 219.16 S 39 10 W 0.05 1499.96 5.1 136.4 3.70 S 3.53 E 1600.00 0.99 217.34 S 37 20 W 0.02 1599.94 5.7 154.7 5.11 S 2.41 E 1700.00 0.84 212.41 S 32 25 W 0.04 1699.93 6.6 166.9 6.42 S 1.50 E 1800.00 0.86 207.33 S 27 20 W 0.02 1799.92 7.7 174.4 7.70 S 0.76 E 1900.00 0.77 202.64 S 22 38 W 0.03 1899.91 9.0 1.79.0 8.99 S 0.15 E • 2 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12 -13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZON TAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 2000.00 0.07 258.69 S 78 41 W 0.18 1999.91 9.6 181.0 9.62 S 0.16 W 2100.00 0.35 22.78 N 22 47 E 0.10 2099.91 9.4 180.6 9.35 S 0 11 W 2200.00 0.30 107.18 S 72 49 E 0.11 2199.90 9.2 178.4 9.1 S S . 0 26 E 2300.00 0.58 136.85 S 43 9 E 0.09 2299.90 9.6 174.9 9.59 S . 0 86 E 2400.00 0.85 146.14 S 33 52 E 0.07 2399.89 10.7 171.3 10.58 S . 1 62 E 2500.00 0.89 143.41 S 36 35 E 0.01 2499.88 12.1 168.1 11.82 S . 2.49 E 2600.00 0.91 139.79 S 40 13 E 0.02 2599.87 13.5 165.1 13.05 S 3 47 E 2700.00 0.87 136.45 S 43 33 E 0.02 2699.86 14.9 162.4 14.20 S . 4 51 E 2800.00 1.10 131.50 S 48 30 E 0.06 2799.84 16.4 159.5 15.39 S . 5 75 E 2900.00 1.12 131.54 S 48 28 E 0.01 2899.82 18.2 156.7 16.67 S . 7 20 E 3000.00 1.15 133.37 S 46 38 E 0.01 2999.80 20.0 154.3 18.01 S . 8.66 E 3100.00 1.17 130.56 S 49 26 E 0.02 3099.78 21.9 152.3 19.37 S 10 16 E 3200.00 3,17 56.24 N 56 14 E 0.77 3199.72 22.7 144.4 18.49 S . 13 24 E 3300.00 6.93 53.33 N 53 20 E 0.94 3299.31 24.4 123.2 13.35 S . 20 38 E 3400.00 9.70 41.73 N 41 44 E 0.81 3398.26 31.0 96.4 3.46 S . 30 83 E 3500.00 13.61 35.60 N 35 36 E 1.02 3496.18 45.0 74.0 12.40 N . 43.29 E 3549.80 15.26 35.39 N 35 23 E 0.83 3544.41 55.3 66.0 22.51 N 50 50 E 3575.00 15.18 35.89 N 35 53 E 0.15 3568.73 61.1 62.8 27.89 N . 54 35 E 3600.00 15.95 36.97 N 36 58 E 0.82 3592.81 67.2 60.3 33.28 N . 58 34 E 3625.00 16.17 36.12 N 36 7 E 0.32 3616.83 73.5 58.1 38.84 N . 62 45 E 3650.00 16.30 36.93 N 36 56 E 0.26 3640.84 80.1 56.3 44.46 N . 66.61 E 3675.00 16.73 36.91 N 36 55 E 0.43 3664.80 86.8 54.7 50.14 N 70 88 E 3700.00 17.23 37.38 N 37 23 E 0.52 3688.71 93.8 53.4 55.96 N . 75 29 E 3725.00 17.62 37.34 N 37 20 E 0.39 3712.57 101.0 52.2 61.91 N . 79.84 E 3 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12 -13, 4-1/2" Tubing Location: Wellh ead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 3750.00 17.78 38.04 N 38 2 E 0.27 3736.38 108.4 51.2 67.92 N 84.48 E 3775.00 18.30 37.76 N 37 46 E 0.53 3760.16 115.9 50.3 74.03 N 89.24E 3800.00 18.22 37.56 N 37 34 E 0.10 3783.90 123.6 49.5 80.23 N 94 02 E 3825.00 18.70 38.65 N 38 39 E 0.59 3807.61 131.4 48.8 86.46 N . 98 91 E 3850.00 19.06 37.78 N 37 47 E 0.46 3831.26 139.3 48.2 92.82 N . 103 91 E 3875.00 19.22 38.42 N 38 25 E 0.26 3854.88 147.4 47.7 99.27 N . 108 97 E 3900.00 19.80 38.82 N 38 49 E 0.60 3878.45 155.7 47.2 105.79 N . 114.18 E 3925.00 19.98 38.47 N 38 28 E 0.22 3901.96 164.1 46.7 112.43 N 119 49 E 3950.00 20.36 38.93 N 38 56 E 0.41 3925.42 172.6 46.3 119.16 N . 124 88 E 3975.00 20.77 39.13 N 39 8 E 0.42 3948.83 181.3 46.0 125.98 N . 130 41 E 4000.00 21.12 39.26 N 39 16 E 0.35 3972.18 190.2 45.7 132.91 N . 136 06 E 4025.00 21.37 38.89 N 38 53 E 0.28 3995.48 199.2 45.4 139.94 N . 141.77 E 4050.00 22.08 39.66 N 39 40 E 0.77 4018.70 208.4 45.1 147.10 N 147 63 E 4075.00 22.99 39.21 N 39 13 E 0.93 4041.79 217.9 44.9 154.50 N . 153 72 E 4100.00 23.33 39.20 N 39 12 E 0.34 4064.78 227.7 44.6 162.12 N . 159.93 E 4125.00 24.08 39.92 N 39 55 E 0.80 4087.67 237.7 44.4 169.87 N 166.33E 4150.00 24.64 39.15 N 39 9 E 0.64 4110.44 248.0 44.2 177.82 N 172.90 E 4175.00 24.68 39.70 N 39 42 E 0.23 4133.16 258.4 44.0 185.88 N 179.52 E 4200.00 25.53 39.78 N 39 47 E 0.85 4155.80 269.0 43.8 194.04 N 186.30 E 4225.00 25.94 39.23 N 39 14 E 0.47 4178.32 279.8 43.7 202.41 N 193.21 E 4250.00 26.51 39.97 N 39 58 E 0.66 4200.75 290.8 43.5 210.92 N 200.25 E 4275.00 27.41 39.61 N 39 37 E 0.91 4223.03 302.2 43.4 219.63 N 207.50 E 4300.00 27.93 39.61 N 39 37 E 0.52 4245.17 313.7 43.2 228.58 N 214.90 E 4325.00 28.93 40.15 N 40 9 E 1.03 4267.16 325.6 43.1 237.71 N 222.54 E 4 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12 -13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg, min. deg./ feet feet deg. feet 25 ft. 4350.00 29.59 39.81 N 39 49 E 0.68 4288.97 337.8 43.0 247.07 N 230 39 E 4375.00 30.06 40.08 N 40 5 E 0.49 4310.66 350.2 42.9 256.60 N . 238 37E 4400.00 30.98 40.30 N 40 18 E 0.93 4332.19 362.9 42.8 266.30 N . 246.56 E 4425.00 31.46 40.14 N 40 8 E 0.49 4353.57 375.9 42.7 276.20 N 254 93 E 4450.00 32.26 40.59 N 40 35 E 0.83 4374.81 389.1 42.6 286.25 N . 263 48 E 4475.00 32.91 40.59 N 40 35 E 0.65 4395.87 402.5 42.6 296.48 N . 272 24 E 4500.00 33.27 40.61 N 40 37 E 0.36 4416.82 416.1 42.5 306.84 N . 281 12 E 4525.00 33.76 40.85 N 40 51 E 0.51 4437.66 429.9 42.4 317.30 N . 290.13 E 4550.00 34.13 41.15 N 41 9 E 0.41 4458.40 443.9 42.4 327.83 N 299 28 E 4575.00 34.27 41.65 N 41 39 E 0.31 4479.08 457.9 42.4 338.38 N . 308 58 E 4600.00 34.46 41.82 N 41 49 E 0.21 4499.71 472.1 42.3 348.91 N . 317 97 E 4625.00 34.53 41.84 N 41 50 E 0.07 4520.32 486.2 42.3 359.46 N . 327 41 E 4650.00 34.40 42.20 N 42 12 E 0.24 4540.93 500.4 42.3 369.97 N . 336.88 E 4675.00 34.64 42.23 N 42 14 E 0.24 4561.53 514.5 42.3 380.46 N 346 40 E 4700.00 34.40 42.63 N 42 38 E 0.33 4582.12 528.7 42.3 390.92 N . 355 96 E 4725.00 34.60 43.05 N 43 3 E 0.31 4602.73 542.9 42.3 401 30 N . 365 59 E 4750.00 34.82 43.05 N 43 3 E 0.22 4623.28 557.1 42.4 . 411.70 N . 375 31E • 4775.00 34.63 43.47 N 43 28 E 0.31 4643.83 571.3 42.4 422.07 N . 385.07 E 4800.00 34.35 43.77 N 43 46 E 0.33 4664.43 585.5 42.4 432.32 N 394 83 E 4825.00 34.64 43.53 N 43 32 E 0.32 4685.04 599.6 42.4 442.57 N . 404 61 E 4850.00 34.53 43.94 N 43 56 E 0.26 4705.62 613.8 42.5 452.82 N . 414 42 E 4875.00 34.64 43.85 N 43 51 E 0.12 4726.20 628.0 42.5 463.04 N . 424 26 E 4900.00 34.51 43.91 N 43 55 E 0.13 4746.78 642.2 42.5 473.27 N . 434.09 E 4925.00 34.88 44.57 N 44 34 E 0.53 4767.34 656.4 42.6 483.47 N 444.02 E 5 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12 -13, 4-1/2" Tub ing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZON TAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 4950.00 35.12 44.30 N 44 18 E 0.29 4787.82 670.8 42.6 493.70 N 454.06 E 4975.00 35.10 44.82 N 44 49 E 0.30 4808.27 685.1 42.6 503.95 N 464.14E 5000.00 35.62 45.05 N 45 3 E 0.54 4828.66 699.6 42.7 514.19 N • 474.36 E 5025.00 35.46 44.77 N 44 46 E 0.23 4849.00 714.1 42.7 524.48 N 484.62 E 5050.00 35.33 45.71 N 45 43 E 0.56 4869.38 728.6 42.8 534.68 N 494.90 E 5075.00 36.00 45.28 N 45 17 E 0.72 4889.69 743.1 42.8 544.90 N 505.30 E 5100.00 36.36 45.32 N 45 19 E 0.36 4909.87 757.9 42.9 555.28 N 515.79 E 5125.00 37.26 45.36 N 45 22 E 0.90 4929.89 772.8 42.9 565.81 N 526.44 E 5150.00 38.19 44.67 N 44 40 E 1.02 4949.66 788.1 43.0 576.62 N 537.26 E 5175.00 38.90 43.33 N 43 20 E 1.10 4969.21 803.7 43.0 587.83 N 548.08 E 5200.00 39.22 40.89 N 40 53 E 1.57 4988.63 819.4 43.0 599.51 N 558.64 E 5225.00 39.67 39.61 N 39 37 E 0.93 5007.93 835.3 42.9 611.63 N 568.90 E 5250.00 40.29 38.80 N 38 48 E 0.81 5027.09 851.3 42.9 624.08 N 579.06 E 5275.00 40.55 38.23 N 38 14 E 0.45 5046.12 867.5 42..8 636.76 N 589.15 E 5300.00 41.26 38.11 N 38 7 E 0.71 5065.02 883.8 42.7 649.63 N 599.27 E 5325.00 41.26 37.55 N 37 33 E 0.37 5083.81 900.3 42.6 662.66 N 609.38E 5350.00 41.29 37.97 N 37 58 E 0.28 5102.60 916.7 42.5 675.69 N 619.48 E 5375.00 41.45 37.79 N 37 47 E 0.20 5121.36 933.2 42.4 688.74 N 629.62 E 5400.00 41.18 37.61 N 37 37 E 0.29 5140.14 949.6 42.4 701.80 N 639.72 E 5425.00 41.29 38.05 N 38 3 E 0.31 5158.94 966.0 42.3 714.81 N 649.82 E 5450.00 41.96 37.94 N 37 56 E 0.67 5177.63 982.6 42.2 727.90 N 660.05 E 5475.00 42.54 37.70 N 37 42 E 0.60 5196.13 999.4 42.1 741.18 N 670.35 E 5500.00 42.64 36.51 N 36 31 E 0.81 5214.54 1016.2 42.0 754.67 N 680.56 E 5525.00 41.94 34.60 N 34 36 E 1.46 5233.03 1032.9 41.9 768.35 N 690.34 E 6 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12-13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 5550.00 41.75 32.95 N 32 57 E 1.12 5251.66 1049.4 41.8 782.21 N 699.61 E 5575.00 41.26 32.32 N 32 19 E 0.64 5270.38 1065.8 41.7 796.16 N 708.55 E 5600.00 41.37 32.38 N 32 23 E 0.12 5289.15 1082.1 41.5 810.11 N 717.38 E 5625.00 41.14 32.01 N 32 1 E 0.34 5307.95 1098.4 41.4 824.06 N 726.16 E 5650.00 40.76 32.15 N 32 9 E 0.39 5326.83 1114.5 41.3 837.94 N 734.86 E 5675.00 40.60 32.11 N 32 7 E 0.16 5345.79 1130.6 41.1 851.74 N 743.53 E 5700.00 40.71 32.26 N 32 16 E 0.15 5364.76 1146.7 41.0 865.53 N 752.21 E 5725.00 40.80 31.85 N 31 51 E 0.28 5383.69 1162.8 40.9 879.36 N 760.87 E 5750.00 40.37 31.93 N 31 56 E 0.43 5402.68 1178.9 40.7 893.17 N 769.46 E 5775.00 40.77 32.08 N 32 5 E 0.41 5421.67 1195.0 40.6 906.96 N 778.08 E 5800.00 40.50 31.82 N 31 49 E 0.32 5440.64 1211.1 40.5 920.77 N 786.69 E 5825.00 40.52 32.13 N 32 8 E 0.20 5459.65 1227.1 40.4 934.55 N 795.29 E 5850.00 40.45 32.41 N 32 25 E 0.19 5478.66 1243.2 40.3 948.27 N 803.96 E 5875.00 40.72 33.09 N 33 5 E 0.52 5497.65 1259.3 40.2 961.95 N 812.76 E 5900.00 40.58 32.95 N 32 57 E 0.17 5516.62 1275.5 40.1 975.60 N 821.63 E 5925.00 40.49 33.23 N 33 14 E 0.20 5535.62 1291.6 40.0 989.22 N 830.50 E 5950.00 40.37 33.10 N 33 6 E 0.15 5554.65 1307.7 39.9 1002.79 N 839.37 E 5975.00 40.39 33,47 N 33 28 E 0.24 5573.69 1323.8 39.8 1016.33 N 848.26 E 6000.00 40.36 33.08 N 33 5 E 0.25 5592.74 1339.9 39.8 1029.87 N 857.15 E 6025.00 39.59 33.16 N 33 10 E 0.77 5611.90 1355.9 39.7 1043.32 N 865.92 E 6050.00 39.75 33.14 N 33 8 E 0.16 5631.14 1371.7 39.6 1056.68 N 874.65 E 6075.00 39.74 33.35 N 33 21 E 0.13 5650.36 1387.6 39.5 1070.05 N 883.41 E 6100.00 39.79 32.99 N 32 59 E 0.24 5669.58 1403.5 39.5 1083.43 N 892.16 E 6125.00 39.35 32.92 N 32 55 E 0.44 5688.85 1419.3 39.4 1096.80 N 900.82 E 6150.00 39.45 32.88 N 32 53 E 0.10 5708.17 1435.1 39.3 1110.12 N 909.44 E 7 • • A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12 -13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min, deg./ feet feet deg. feet 25 ft. 6175.00 39.00 32.83 N 32 50 E 0.45 5727.53 1450.8 39.3 1123.40 N 918 02E 6200.00 39.63 32.93 N 32 56 E 0.63 5746.88 1466.5 39.2 1136.70 N . 926 62 E 6225.00 39.93 32.65 N 32 39 E 0.35 5766.09 1482.4 39.1 1150.15 N . 935 28 E 6250.00 40.55 32.46 N 32 28 E 0.63 5785.17 1498.5 39.0 1163.76 N . 943.97 E 6275.00 40.06 32.39 N 32 23 E 0.49 5804.24 1514.5 39.0 1177.41 N 952.64 E 6300.00 40.37 32.89 N 32 53 E 0.45 5823.33 1530.6 38.9 1191.00 N 961 35 E 6325.00 40.72 32.64 N 32 38 E 0.39 5842.33 1546.7 38.8 1204.67 N . 970 14 E 6350.00 40.53 32.73 N 32 44 E 0.20 5861.30 1562.9 38.8 1218.37 N . 978 93 E 6375.00 40.29 32.48 N 32 29 E 0.29 5880.34 1579.0 38.7 1232.02 N . 987 67 E 6400.00 39.80 32.71 N 32 43 E 0.51 5899.47 1595.0 38.7 1245.57 N . 996.33 E 6425.00 40.14 32.85 N 32 51 E 0.35 5918.63 1611.0 38.6 1259.08 N 1005 03 E 6450.00 40.14 32.54 N 32 32 E 0.20 5937.75 1627.0 38.5 1272.64 N . 1013 73 E 6475.00 40.23 32.43 N 32 26 E 0.11 5956.85 1643.1 38.5 1286.25 N . 1022 40 E 6500.00 39.61 31.95 N 31 57 E 0.69 5976.02 1659.0 38.4 1299.82 N . 1030 94 E 6525.00 39,58 32.21 N 32 13 E 0.17 5995.28 1674.9 38.4 1313.32 N . 1039.41 E 6550.00 39.74 31.86 N 31 52 E 0.27 6014.53 1690.7 38.3 1326.85 N 1047.87E 6575.00 39.95 31.96 N 31 58 E 0.22 6033.72 1706.6 38.2 1340.45 N 1056.34 E 6600.00 39.86 31.27 N 31 16 E 0.45 6052.90 1722.6 38.2 1354.10 N 1064.74 E 6625.00 39.56 31.30 N 31 18 E 0.30 6072.13 1738.4 38.1 1367.75 N 1073.04 E 6650.00 39.43 30.98 N 30 59 E 0.24 6091.43 1754.2 38.1 1381.36 N 1081.26 E 6675.00 39.50 31.18 N 31 11 E 0.15 6110.73 1770.0 38.0 1394.97 N 1089.46 E 6700.00 39.63 30.76 N 30 46 E 0.30 6130.00 1785.8 37.9 1408.63 N 1097.66 E 6725.00 39.45 30.94 N 30 56 E 0.21 6149.28 1801.6 37.9 1422.29 N 1105.82 E 6750.00 39.23 30.24 N 30 14 E 0.50 6168.61 1817.3 37.8 1435.93 N 1113.88 E 8 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12-13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAI. CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH ' DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 6775.00 38.55 30.28 N 30 17 E 0.68 6188.07 1832.9 37.7 1449.49 N 1121.79 E 6800.00 38.74 29.99 N 29 59 E 0.26 6207.60 1848.4 37.7 1462.99 N 1129.63 E 6825.00 38.62 30.38 N 30 23 E 0.27 6227.11 1863.8 37.6 1476.50 N 1137.49 E 6850.00 38.36 30.17 N 30 10 E 0.29 6246.68 1879.3 37.5 1489.93 N 1145.33 E 6875.00 37.93 30.25 N 30 1S E 0.43 6266.34 1894.6 37.5 1503.28 N 1153.10 E 6900.00 37.93 29.72 N 29 43 E 0.33 6286.06 1909.8 37.4 1516.59 N 1160.78 E 6925.00 38.31 29.59 N 29 35 E 0.39 6305.73 1925.1 37.4 1530.00 N 1168.42 E 6950.00 37.39 29.50 N 29 30 E 0.92 6325.47 1940.3 37.3 1543.35 N 1175.98 E 6975.00 37.50 29.90 N 29 54 E 0.27 6345.32 1955.4 37.2 1556.55 N 1183.51 E 7000.00 37.40 29.73 N 29 44 E 0.14 6365.17 1970.5 37.2 1569.74 N 1191.07 E 7025.00 37.03 29.94 N 29 56 E 0.39 6385.07 1985.5 37.1 1582.85 N 1198.59 E 7050.00 37.05 29.46 N 29 28 E 0.29 6405.03 2000.4 37.1 1595.94 N 1206.05 E 7075.00 36.93 29.51 N 29 31 E 0.12 6425.00 2015.3 37.0 1609.03 N 1213.46 E 7100.00 36.83 29.24 N 29 14 E 0.19 6445.00 2030.2 37.0 1622.10 N 1220.82 E 7125.00 36.32 29.49 N 29 29 E 0.53 6465.07 2044.9 36.9 1635.09 N 1228.12 E 7150.00 36.33 29.11 N 29 7 E 0.23 6485.21 2059.6 36.9 1648.00 N 1235.37 E 7175.00 36.02 29.37 N 29 22 E 0.35 6505.40 2074.2 36.8 1660.88 N 1242.58 E 7200.00 35.93 28.99 N 28 59 E 0.24 6525.63 2088.8 36.7 1673.70 N 1249.74 E 7225.00 36.23 29.04 N 29 2 E 0.30 6545.83 2103.4 36.7 1686.57 N 1256.88 E 7250.00 35.84 28.54 N 28 32 E 0.49 6566.05 2118.0 36.6 1699.46 N 1263.96 E 7275.00 35.71 28.65 N 28 39 E 0.15 6586.33 2132.4 36.6 1712.30 N 1270.96 E 7300.00 35.75 28.53 N 28 32 E 0.08 6606.63 2146.9 36.5 1725.11 N 1277.94 E 7325.00 35.91 28.44 N 28 26 E 0.17 6626.89 2161.4 36.5 1737.98 N 1284.92 E 7350.00 35.18 28.16 N 28 10 E 0.75 6647.24 2175.8 36.4 1750.77 N 1291.81 E 9 • A Gyrodata Directional Survey BP Exploration (Al aska) Lease: Drill Site 12 Well: 12 -13, 4-1/2" Tubing Location: Wellhead , Prudhoe Bay, Alaska Job Number: AK02 08G 112 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 7375.00 35.21 27.87 N 27 52 E 0.17 6667.67 2190.0 36.4 1763.49 N 1298.58 E 7400.00 34.91 27.86 N 27 52 E 0.30 6688.13 2204.2 36.3 1776.19 N 1305.29 E 7425.00 34.75 27.64 N 27 38 E 0.20 6708.65 2218.4 36.3 1788.83 N 1311.94 E 7450.00 34.50 27.59 N 27 35 E 0.25 6729.22 2232.4 36.2 1801.41 N 1318.53 E 7475.00 34.23 27.21 N 27 13 E 0.34 6749.86 2246.3 36.1 1813.94 N 1325.02 E 7500.00 33.76 27.21 N 27 13 E 0.47 6770.59 2260.2 36.1 1826.37 N 1331.41 E 7525.00 33.61 27.14 N 27 8 E 0.15 6791.39 2273.9 36.0 1838.71 N 1337.74 E 7550.00 33.88 27.39. N 27 23 E 0.30 6812.18 2287.6 36.0 1851.05 N 1344.11 E 7575.00 33.45 27.31 N 27 19 E 0.43 6832.98 2301.3 35.9 1863.36 N 1350.47 E 7600.00 33.26 27.02 N 27 1 E 0.25 6853.87 2314.9 35.9 1875.59 N 1356.75 E 7625.00 33.07 27.36 N 27 22 E 0.27 6874.79 2328.4 35.8 1887.76 N 1363.00 E 7650.00 32.93 26.73 N 26 44 E 0.37 6895.76 2341.8 35.8 1899.88 N 1369.19 E 7675.00 33.18 27.17 N 27 10 E 0.35 6916.71 2355.3 35.7 1912.04 N 1375.37 E 7700.00 32.73 27.45 N 27 27 E 0.48 6937.69 2368.8 35.7 1924.12 N 1381.61 E 7725.00 32.44 27.44 N 27 26 E 0.29 6958.76 2382.1 35.6 1936.07 N 1387.81 E 7750.00 32.04 27.85 N 27 51 E 0.46 6979.90 2395.3 35.6 1947.88 N 1394.00 E 7775.00 31.77 27.90 N 27 54 E 0.27 7001.13 2408.4 35.5 1959.56 N 1400.18 E 7800.00 31.76 28.33 N 28 20 E 0.23 7022.38 2421.5 35.5 1971.17 N 1406.38 E 7825.00 31.20 28.43 N 28 26 E 0.56 7043.70 2434.4 35.5 1982.66 N 1412.59 E 7850.00 30.88 29.21 N 29 13 E 0.51 7065.12 2447.2 35.4 1993.95 N 1418.80 E 7875.00 30.48 28.97 N 28 58 E 0.42 7086.62 2459.9 35.4 2005.10 N 1425.00 E 7900.00 30.34 29.31 N 29 19 E 0.22 7108.18 2472.5 35.4 2016.15 N 1431.16 E 7925.00 29.95 30.69 N 30 41 E 0.80 7129.80 2485.0 35.3 2027.02 N 1437.44 E 7950.00 29.34 30.72 N 30 43 E 0.61 7151.53 2497.3 35.3 2037.66 N 1443.75 E • • 10 BP Exploration (Alaska) Lease: Drill Site 12 Well: 12-13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH CO ORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 7975.00 29.22 30.60 N 30 36 E 0.13 7173.34 2509.5 35.3 2048.17 N 1449.99 E 8000.00 28.87 31.39 N 31 23 E 0.52 7195.19 2521.6 35.3 2058.58 N 1456.24 E 8025.00 28.93 29.46 N 29 28 E 0.93 7217.08 2533.6 35.3 2069.00 N 1462.36 E 8050.00 28.98 31.63 N 31 38 E 1.05 7238.95 2545.7 35.2 2079.42 N 1468.51 E 8075.00 28.66 30.33 N 30 20 E 0.70 7260.86 2557.7 35.2 2089.75 N 1474.71 E 8100.00 28.50 30.15 N 30 9 E 0.18 7282.81 2569.6 35.2 2100.08 N 1480.73 E 8125.00 28.16 31.37 N 31 22 E 0.67 7304.82 2581.4 35.2 2110.28 N 1486.80 E 8150.00 28.27 29.35 N 29 21 E 0.96 7326.85 2593.2 35.1 2120.47 N 1492.77 E 8175.00 28.26 31.06 N 31 4 E 0.81 7348.87 2605.0 35.1 2130.70 N 1498.73 E 8200.00 28.02 30.72 N 30 43 E 0.29 7370.91 2616.8 35.1 2140.82 N 1504.78 E 8225.00 27.81 30.12 N 30 7 E 0.35 7393.00 2628.4 35.1 2150.91 N 1510.71 E 8250.00 27.52 29.23 N 29 14 E 0.50 7415.15 2640.0 35.1 2161.00 N 1516.45 E 8275.00 27.70 31.62 N 31 37 E 1.12 7437.30 2651.5 35.0 2170.99 N 1522.32 E 8300.00 27.43 29.59 N 29 35 E 0.98 7459.46 2663.1 35.0 21$0.94 N 1528.21 E 8325.00 27.22 30.38 N 30 23 E 0.42 7481.67 2674.5 35.0 2190.88 N 1533.95 E 8350.00 27.15 30.66 N 30 40 E 0.15 7503.91 2685.9 35.0 2200.72 N 1539.75 E 8375.00 26.86 29.22 N 29 13 E 0.72 7526.18 2697.2 35.0 2210.56 N 1545.41 E 8400.00 26.86 31.51 N 31 31 E 1.03 7548.49 2708.5 34.9 2220.30 N 1551.12 E 8425.00 26.70 29.06 N 29 4 E 1.12 7570.81 2719.7 34.9 2230.03 N 1556.80 E 8450.00 26.30 30.74 N 30 44 E 0.85 7593.18 2730.8 34.9 2239.70 N 1562.36 E 8475.00 26.39 31.07 N 31 4 E 0.17 7615.58 2741.9 34.9 2249.21 N 1568.06 E 8500.00 26.01. 29.04 N 29 2 E 0.97 7638.02 2752.9 34.9 2258.77 N 1573.59 E 8525.00 26.02 31.48 N 31 29 E 1.07 7660.48 2763.8 34.8 2268.24 N 1579.11 E 8550.00 25.84 29.39 N 29 23 E 0.93 7682.97 2774.7 34.8 2277.66 N 1584.65 E • C 11 A Gyrodata Directional Survey BP Exploration (Alaska} Lease: Drill Site 12 Well: 12 -13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 8575.00 25.64 30.29 N 30 17 E 0.44 7705.49 2785.5 34.8 2287.08 N 1590.05 E 8600.00 25.24 30.88 N 30 53 E 0.47 7728.06 2796.2 34.8 2296.32 N 1595.51 E 8625.00 25.58 31.52 N 31 31 E 0.44 7750.64 2806.9 34.8 2305.50 N 1601.07 E 8650.00 24.51 29.25 N 29 15 E 1.44 7773.29 2817.5 34.8 2314.62 N 1606.43 E 8675.00 25.20 29.81 N 29 49 E 0.73 7795.98 2827.9 34.7 2323.77 N 1611.61 E 8700.00 24.94 31.46 N 31 28 E 0.75 7818.62 2838.5 34.7 2332.88 N 1617.00 E 8725.00 24.29 30.55 N 30 33 E 0.75 7841.35 2848.9 34.7 2341.80 N 1622.37 E 8750.00 24.41 29.73 N 29 44 E 0.3b 7864.13 2859.2 34.7 2350.72 N 1627.54 E 8775.00 24.46 32.10 N 32 6 E 0.98 7886.89 2869.5 34.7 2359.59 N 1632.86 E 8800.00 23.46 29.90 N 29 54 E 1.34 7909.74 2879.6 34.7 2368.29 N 1638.09 E 8825.00 23.44 28.66 N 28 40 E 0.49 7932.67 2889.5 34.7 2376.97 N 1642.95 E 8850.00 23.46 26.93 N 26 56 E 0.69 7955.61 2899.4 34.6 2385.77 N 1647.59 E 8875.00 24.37 24.33 N 24 20 E 1.39 7978.46 2909.4 34.6 2394.90 N 1651.97 E 8900.00 25.81 21.45 N 21 27 E 1.89 8001.10 2919.8 34.6 2404.67 N 1656.09 E 8925.00 26.81 18.27 N 18 16 E 1.73 8023.51 2930.5 34.5 2415.09 N 1659.84 E 8950.00 27.60 16.23 N 16 14 E 1.22 8045.75 2941.4 34.4 2426.00 N 1663.23 E 8975.00 29.17 15.73 N 15 44 E 1.59 8067.74 2952.7 34.4 2437.43 N 1666.50 E 9000.00 30.22 16,26 N 16 16 E 1.08 8089.46 2964.4 34.3 2449.33 N 1669.91 E 9025.00 32.04 16.20 N 16 12 E 1.82 8110.86 2976.7 34.2 2461.74 N 1673.53 E 9050.00 33.86 15.73 N 15 44 E 1.84 8131.83 2989.6 34.1 2474.81 N 1677.26 E 9075.00 35.57 14.81 N 14 49 E 1.79 8152.38 3003.1 34.0 2488.55 N 1681.01 E 9100.00 37.32 13.61 N 13 37 E 1.89 8172.49 3017.1 33.9 2502.95 N 1684.65 E 9125.00 39.54 12.87 N 12 52 E 2.27 8192.08 3031.6 33.8 2518.07 N 1688.21 E 9150.00 41.18 11.60 N 11 36 E 1.83 8211.13 3046.7 33.7 2533.89 N 1691.64 E • 12 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 12 Well: 12-13, 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0208G 112 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 9175.00 42.62 9.34 N 9 20 E 2.09 8229.73 3062.0 33.6 2550.31 N 1694.67 E 9200.00 44.51 8.31 N 8 19 E 2.02 8247.85. 3077.7 33.5 2567.33 N 1697.31E 9225.00 46.19 7.70 N 7 42 E 1.74 8265.42 3093.7 33.3 2584.94 N 1699.78 E 9250.00 47.91 6.54 N 6 32 E 1.92 8282.45 3110.2 33.2 2603.10 N 1702.05 E 9275.00 50.04 6.08 N 6 5 E 2.16 8298.86 3127.0 33.0 2621.85 N 1704.12 E 9300.00 51.92 6.46 N 6 28 E 1.90 8314.60 3144.4 32.9 2.641.15 N 1706.24 E 9325.00 52.33 5.76 N 5 46 E 0.69 8329.95 3162.0 32.7 2660.77 N 1708.34 E 9350.00 50.22 4.01 N 4 1 E 2.51 8345.59 3179.2 32.5 2680.20 N 1710.01 E 9375.00 48.14 3.26 N 3 16 E 2.16 8361.93 3195.8 32.4 2699.08 N 1711.21 E 9400.00 48.81 2.75 N 2 45 E 0.77 8378.50 3212.1 32.2 2717.77 N 1712.19 E 9425.00 50.60 1.76 N 1 46 E 1.94 8394.67 3228.7 32.0 2736.83 N 1712.94 E 9450.00 53.18 1.41 N 1 25 E 2.59 8410.10 3245.6 31.9 2756.49 N 1713.48 E 9475.00 54.42 1.29 N 1 17 E 1.24 8424.86 3263.0 31.7 2776.66 N 1713.96 E 9500.00 55.84 1.10 N 1 6 E 1.43 8439.16 3280.7 31.5 2797.16 N 1714.38 E 9525.00 57.05 0.69 N 0 41 E 1.26 8452.97 3298.7 31.3 2817.99 N 1714.71 E 9550.00 59.47 0.40 N 0 24 E 2.43 8466.12 3317.0 31.1 2839.25 N 1714.91E 9575.00 61.69 0.54 N 0 32 E 2.22 8478.40 3335.7 30.9 2861.03 N 1715.09 E 9600.00 63.06 0.47 N 0 28 E 1.37 8490.00 3354.8 30.7 2883.17 N 1715.28 E 9625.00 63.05 0.58 N 0 35 E 0.10 8501.32 3374.1 30.6 2905.46 N 1715.49 E 9650.00 62.90 0.66 N 0 40 E 0.17 8512.68 3393.4 30.4 2927.73 N 1715.73 E Final Station Closure: Distance: 3393.42 ft Az: 30.37 deg. 13 BP Exploration (Alaska) Well: Drill Site 12 12-13 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska 3000 2500 2000 z 1500 z 1000 500 0 Final Gyrodata AK0208G_112 DEFINITIVE _ --- '.___-___ _..___i _.-- __-__- .___ i _._ ___-- -al_ _-- -__._ ~ ______ ___.___ ~__~___ __-- i_-- --_-- -____ BOTTO t __..__ ____._._._ HOLE j I ' ~ ~ ~ LOCATE _ __ I ' , i i, MD: 96 ~ I X0.00 i _. ---- - ' ~ _---- i 4------ - --__ - I i I--_.. _ ~ , ~ i j ~ i - --- - -- -. ~ I , I i _-- - ~ I ~ { i i ----- --i ~ 1 l II _.------------ ~ ; i 'I ~ ~ ~ I ~ I _ _ I i ----- - i - --_ ------__l I ~ ~ _ ----- - ~ ---- - --_ ~ ~ ~ I --- ---- i - - ------ -- i ~, ~ I'~ i ~ E ---- -, - -- ---------! - -_. _--------~ i I ~ -- - __ _ _ _ i _ _ __..-_ j - ~ _- _ __-_ -- ----.__ i ___ --- - _ -- ~ I - -_- -- - -i , , ~ I' ---- _ ._ _ ._. _ __ _ ___ ~ ~ I --_ i i 'i - ~I _.__ ____ ___- _-___- __.. _ _ __ i ~ ~ I ~ ~ ~ i - i ~ 1-- ~ i ~ I~ ~~ j ~ ~ i i ~ ~ • • 0 200 400 600 800 1000 1200 1400 1600 1800 FASTING (ft) BP Exploration (Alaska) Well: Drill Site 12 12-13 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska 5.0 4.5 4.0 3.5 ~. w N X30 ~_ w 2.5- w t~ 2.0- 0 1.5 l.o- 0.5 0.0 - 0 Final Gyrodata AK0208G 112 DEFINITIVE - - _ _.-_.______y - i _-_.._________ ~ - - ~ I i i i - --_ _ _ _ _-- E ___ j ~ ~ I I I i - ~ i ~ ~ 4 ~ _.__..___ ___ __. _...__._.._.._.._.__ _. __ -------- _~- '~,I '~ - __ ---- - - __ ___--- -------- ~ ~ E __ ._.__ ____.. ~ ----- ~ r ! ~~ ---- - -_._ ----... __ ---.... __ -....- ~ I --- I I ~ -_..__._.- _..__ r ~ i I ~ _. I - - - ___- -- __.- ---- ~ fi - -. t - - ~ t-- -- --- - - If I ~ _ L. --- - - ___.. - ~ i' I -- ------ -- I I ------- ------ -- ------ -- ----- - I ----- -_----- ~ -- -- ----~ -- _ -_--- I ------ - -- _f ------- i ---~------- -~-...._ ----- - - ~------ --- -- -i - - ---------- - -- ----_ _- ------- --_ ---t I I ' ' ---- - ; --------- --- - ___ __ - -E- -_. ~ ------ _. -- - ---- - ~ - i B ~ TTOM HOL~ ;~ _____ r ----- -- -_ - - - - r -- ----_ --L ATf D - j ~ ~ ~ ~ ~~~ ~ ~ M ~ :9650.00; 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 MEASURED DEPTH (ft) • BP Exploration (Alaska) Well: Drill Site 12 12-13 4-1/2" Tubing Location: Wellhead, Prudhoe Bay, Alaska 65 60 55 50 45 40 z O Q 35 z J z 30 «., 25 20 15 10 5 0-, 0 Final _ Gyrodata AK0208G 112 DEFINITIVE - -- i -, _ ~ I I I BO ~ OM HOLE~I ~ -----_-- -- - ~~-- -- - -- - , - r----- -- - ~ -- --- - ----- ------ ~ __.--- ---- - ~ ~- - ~ -~ ~-----~ ----- ~ i ~ ~ i ~ i MD: 9650.00 --- ------ __ ---- ------- - --- -- ------ - - ~ - -- --- _--------- ---- - t --~ _ ~ ~ ( ~ ~ ~ 1 I ---- -- - --- - ~ ------- l__.. r ~ ~ -------- ----- ~ i ~ - --- - - --_ - -- - - ~ ----- - - ---------- ----- -- I ----- -----1 --- I ~ ~ } I -- ------------ ------ __- --- ~ fi------ I I I ,,- --- - - ------- _- --- I ~ i , ~ ---- -- _.._ - I --- - _--- _. --- 1 ~ ' ___ ~ - ~ - _--- ------~ - ---- _ ---___ ~ __--- _-_. ~ ~ ~ I ~ i L_ I 'I i ~ _._ ~ ' ~ --- C _ _ ---- - --- --- - -1 ---------- I ---- ---- _ I i _--- ... ~ I r.._- IL_- ___ _ ~ ~ ~ ~ I i ~ ' r 1 - _______ ~ ~ I ~~ _.-___ __-_ _t ___-- --_. _._-~----__.______ _-~ _____-- ___-~ _; ~ ~ II - _ _I- -- ~ i ~ ~~ -- --- i ' r - ---_----- ---~ i ------ ------ ~---------- ~ I ~ -- -- -- ~ i ~ L---- ------'L _ i ----------- ~ -- ~f_----- --i ~ ~ ~ , ~ ~ ~I -- ------ --~_ _ -__ -- I ~ I --T -- -T - - --- ----- _~ __ 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 MEASURED DEPTH (ft) Survey QC - RGS-CT~ecification Sheet SURVEY QUALITY CONTROL -SPECIFICATION DATA TNTTT~1 TCATTtIIU Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs (ERMeas-ERTneu) 46 14.91 35.16 0.0141 47 14.91 35.17 0.0114 48 14.41 35.13 0.0059 49 14.91 35.13 0.0036 50 14.91 35.12 0.0065 51 14.91 35.15 0.0075 Average 14.91 35.14 0.0082 Tolerance on Average* 0.0855 Standard Deviation 0.00 0.02 0.0035 Tolerance on St. Dev.** 0.1° 0.2° 0.0427 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by -(1/CosI) * d[(CosA*SinI*0.1)z+D_nR~] o/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/CosI) 'v[(CosA*SinI*0.1)~+(O.OSZ/(n-1))] o/hr r)RTFT TIiNFG Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1488.22 5598.88 41.23 32.09 0.000 0.000 0.000 0.000 2 1548.85 7698.66 32.53 27.86 -0.000 -0.000 0.000 0.000 3 1426.67 9604.28 63.01 1.90 -0.000 0.000 0.000 0.000 4 1290.96 8078.07 27.92 31.61 -0.000 0.001 0.000 -0.000 5 516.90 7698.30 32.38 27.37 -0.002 0.002 -0.002 0.003 6 1670.29 5599.06 41.23 32.21 0.000 0.000 0.000 0.000 7 1365.88 3549.79 15.11 36.39 -0.000 -0.000 0.000 0.000 Average -0.000 0.000 -0.000 0.001 Standard Deviation 0.001 0.001 0.001 0.001 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr INCLTNATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * Outrun * Difference Inrun * Outrun * Difference 100.00 0.32 0.25 0.07 32.17 20.54 11.63 200.00 0.05 0.11 -0.06 153.78 123.25 30.53 300.00 0.02 0.02 -0.00 0.48 38.47 -37.99 400.00 0.11 0.09 0.02 78.40 60.02 18.38 500.00 0.23 0.20 0.03 93.56 90.79 2.77 600.00 0.28 0.27 0.01 99.88 99.82 0.06 700.00 0.36 0.34 0.02 100.92 100.79 0.13 800.00 0.39 0.38 0.01 92.77 93.84 -1.07 900.00 0.48 0.45 0.03 101.61 100.32 1.29 SURV-Q767 (OPS SUR-MA-003) 19"' Nov 03 /Rev 15 Page 1 of 8 AK0208G 112 Survey QC - RGS-CT~cification Sheet 1000.00 0.53 0.52 0.01 105.81 104.89 0.92 1100.00 0.36 0.40 -0.04 110.24 108.62 1.62 1200.00 0.32 0.32 -0.00 166.93 154.15 12.78 1300.00 0.47 0.43 0.04 184.36 179.39 4.97 1400.00 0.87 0.77 0.10 218.83 210.39 8.44 1500.00 1.07 1.02 0.05 219.16 219.81 -0.65 1600.00 0.99 1.01 -0.02 217.34 216.80 0.54 1700.00 0.84 0.87 -0.03 212.41 213.40 -0.99 1800.00 0.86 0.85 0.01 207.33 209.51 -2.18 1900.00 0.77 0.80 -0.03 202.64 203.20 -0.56 2000.00 0.07 0.24 -0.17 258.69 243.90 14.79 2100.00 0.35 0.28 0.07 22.78 352.60 30.18 2200.00 0.30 0.31 -0.01 107.18 89.16 18.02 2300.00 0.58 0.52 0.06 136.85 132.38 4.47 2400.00 0.85 0.80 0.05 146.14 145.38 0.76 2500.00 0.89 0.88 0.01 143.41 144.17 -0.76 2600.00 0.91 0.91 0.00 139.79 139,93 -0.14 .2700.00 0.87 0.88 -0.01 136.45 136.05 0.40 2800.00 1.10 1.04 0.06 131.50 131.33 0.17 2900.00 1.12 1.12 0.00 131.54 130.22 1.32 3000.00 1.15 1.14 0.01 133.37 131.59 1.78 3575.00 15.18 15.15 0.03 35.89 36.50 -0.61 3600.00 15.95 16.03 -0.08 36.97 37.44 -0.47 3625.00 16.17 15.11 0.06 36.12 36.48 -0.36 3650.00 16.30 16.41 -0.11 36.93 37.92 -0.99 3675.00 16.73 16.81 -0.08 36.91 36.77 0.14 3700.00 17.23 17.11 0.12 37.38 38.26 -0.88 3725.00 17.62 17.84 -0.22 37.34 37.92 -0.58 3750.00 17.78 17.71 0.07 38.04 38.18 -0.14 3775.00 18.30 18.34 -0.04 37.76 38.54 -0.78 3800.00 18.22 18.28 -0.06 37.56 37.97 -0.41 3825.00 18.70 18.77 -0.07 38.65 39.16 -0.51 3850.00 19.06 - 19.05 0.01 37.78 38.08 -0.30 3875.00 19.22 19.25 -0.03 38.42 39.23 -0.81 3900.00 19.80 19.93 -0.13 38.82 38.95 -0.13 3925.00 19.98 19.83 0.15 38.47 39.04 -0.57 3950.00 20.36 20.56 -0.20 38.93 39.75 -0.82 3975.00 20.77 20.74 0.03 39.13 39.08 0.05 4000.00 21.12 21.06 0.06 39.26 40.17 -0.91 4025.00 21.37 21.55 -0.18 38.89 39.24 -0.35 4050.00 22.08 22.00 0.08 39.66 39.96 -0.30 4075.00 22.99 23.05 -0.06 39.21 39.88 -0.67 4100.00 23.33 23.37 -0.04 39.20 39.52 -0.32 4125.00 24.08 24.07 0.01 39.92 40.43 -0.51 4150.00 24.64 24.66 -0.02 39.15 39.56 -0.41 SURV-Q167 (OPS SUR-MA-003) 19~" Nov 03 /Rev iS Page 2 of S AK0208G 112 Survey QC - RGS-CT~cification Sheet 4175.00 24.68 24.70 -0.02 39.70 40.21 -0.51 4200.00 25.53 25.56 -0.03 39.78 40.15 -0.37 4225.00 25.94 25.86 0.08 39.23 39.69 -0.46 4250.00 26.51 26.59 -0.08 39.97 40.52 -0.55 4275.00 27.41 27.40 0.01 39.61 39.79 -0.18 4300.00 27.93 27.86 0.07 39.61 40.26 -0.65 4325.00 28.93 29.06 -0.13 40.15 40.51 -0.36 4350.00 29.59 29.44 0.15 39.81 40.02 -0.21 4375.00 30.06 30.06 0.00 40.08 40.82 -0.74 4400.00 30.98 31.08 -0.10 40.30 40.44 -0.14 4425.00 31.46 31.28 0.18 40.14 40.58 -0.44 4450.00 32.26 32.41 -0.15 40.59 41.19 -0.60 4475.00 32.91 32.88 0.03 40.59 40.63 -0.04 4500.00 33.27 33.14 0.13 40.61 41.26 -0.65 4525.00 33.76 33.92 -0.16 40.85 41.18 -0.33 4550.00 34.13 33.95 0.18 41.15 41.34 -0.19 4575.00 34.27 34,28 -0.01 41.65 42.38 -0.73 4600.00 34.46 34.58 -0.12 41.82 41.90 -D.08 4625.00 34.53 34.35 0.18 41.84 42.24 -0.40 4650.00 34.40 34.52 -0.12 42.20 42.77 -0.57 4675.00 34.64 34.57 0.07 42.23 42.26 -0.03 4700.00 34.40 34.27 0.13 42.63 43.25 -0.62 4725.00 34..60 34.78 -0.18 43.05 43.35 -0.30 4750.00 34.82 34.67 0.15 43.05 43.23 -0.18 4775.00 34.63 34.64 -0.01 43.47 44.16 -0.69 4800.00 34.35 34.41 -0.06 43.77 43.91 -0.14 4825.00 34.64 34.47 0.17 43.53 43.93 -0.40 4850.00 34.53 34.66 -0.13 43.94 44.44 -0.50 4875.00 34.64 34.60 0.04 43.85 43.97 -0.12 4900.00 34.51 34.41 0.10 43.91 44.44 -0.53 4925.00 34.88 34.96 -0.08 44.57 44.90 -0.33 4950.00 35.12 35.06 0.06 44.30 44.55 -0.25 4975.00 35.10 35.10 -0.00 44.82 45.21 -0.39 5000.00 35.62 35.60 0.02 45.05 45.41 -0.36 5025.00 35.46 35.46 0.00 44.77 45.08 -0.31 5050.00 35.33 35.24 0.09 45.71 46.01 -0.30 5075.00 36.00 36.02 -0.02 45.28 45.78 -0.50 5100.00 36.36 36.38 -0.02 45.32 45.42 -0.10 5125.00 37.26 37.08 0.18 45.36 45.81 -0.45 5150.00 38.19 38.33 -0.14 44.67 45.13 -0.46 5175.00 38.90 38.80 0.10 43.33 43.36 -0.03 5200.00 39.22 39.11 0.11 40.89 41.54 -0.65 5225.00 39.67 39.82 -0.15 39.61 39.88 -0.27 5250.00 40.29 40.12 0.17 38.80 38.96 -0.16 5275.00 40.55 40.50 0.05 38.23 38.72 -0.49 SURV-Q167 (OPS SUR-MA-003) 19~" Nov 0 3 /Rev 15 Page 3 of 8 AK0208G 112 Survey QC - RGS-CT~ecification Sheet 5300.00 41.26 41.24 0.02 38.11 38.32 -0.21 5325.00 41.26 41.21 0.05 37.55 37.83 -0.28 5350.00 41.29 41.25 0.04 37.97 38.23 -0.26 5375.00 41.45 41.41 0.04 37.79 38.19 -0.40 5400.00 41.18 41.23 -0.05 37.61 37.75 -0.14 5425.00 41.29 41.08 0.21 38.05 38.31 -0.26 5450.00 41.96 42.01 -0.05 37.94 38.46 -0.52 5475.00 42.54 42.55 -0.01 37.70 37.71 -0.01 5500.00 42.64 42.43 0.21 36.51 36.91 -0.40 5525.00 41.94 42.00 -0.06 34.60 34.97 -0.37 5550.00 41.75 41.69 0.06 32.95 33.10 -0.15 5575.00 41.26 41.26 0.00 32.32 32.59 -0.27 5600.00 41.37 41.24 0.13 32.38 32.67 -0.29 5625.00 41.14 41.17 -0.03 32.01 32.40 -0.39 5650.00 40.76 40.67 0.09 32.15 32.09 0.06 5675.00 40.60 40.43 0.17 32.11 32.56 -0.45 5700.00 40.71 40.84 -0.13 32.26 32.53 -0.27 5725.00 40.80 40.70 O.IO 31.85 32.02 -0.17 5750.00 40.37 40.29 0.08 31.93 32.14 -0.21 5775.00 40.77 40.59 0.18 32.08 32.45 -0.37 5800.00 40.50 40.65 -0.15 31.82 32.13 -0.31 5825.00 40.52 40.39 0.13 32.13 32.10 0.03 5850.00 40.45 40.31 0.14 32.41 32.84 -0.43 5875.00 40.72 40.66 0.06 33.09 33.32 -0.23 5900.00 40.58 40.58 -0.00 32.95 33.26 -0.31 5925.00 40.49 40.44 0.05 33.23 33.16 0.07 5950.00 40.37 40.18 0.19 33.10 33.52 -0.42 5975.00 40.39 40.40 -0.01 33.47 33.72 -0.25 6000.00 40.36 40.29 0.07 33.08 33.39 -0.31 6025.00 39.59 39.60 -0.01 33.16 33.12 0.04 6050.00 39.75 39.55 0.20 33.14 33.42 -0.28 6075.00 39.74 39.74 -0.00 33.35 33.63 -0.28 6100.00 39.79 39.71 0.08 32.99 33.34 -0.35 6125.00 39.35 39.41 -0.06 32.92 32.91 0.01 6150.00 39.45 39.28 0.17 32.88 33.06 -0.18 6175.00 39.00 38.95 0.05 32.83 33.08 -0.25 6200.00 39.63 39.48 0.15 32.93 33.27 -0.34 6225.00 39.93 39.99 -0.06 32.65 32.91 -0.26 6250.00 40.55 40.41 0.14 32.46 32.46 0.00 6275.00 40.06 39.95 0.11 32.39 32.65 -0.26 6300.00 40.37 40.25 0.12 32.89 33.03 -0.14 6325.00 40.72 40.71 0.01 32.64 33.11 -0.47 6350.00 40.53 40.59 -0.06 32.73 32.74 -0.01 6375.00 40,29 40.09 0.20 32.48 32.56 -0.08 6400.00 39.80 39.75 0.05 32.71 32.86 -0.15 SURV-Q367 (OPS SU R-MA-003) 19`" Nov 03 /Rev 15 Page 4 of 8 AK0208G 112 Survey QC - RGS-CT~ecification Sheet 6425.00 40.14 40.00 0.14 32.85 33.10 -0.25 6450.00 40.14 40.23 -0.09 32.54 32.89 -0.35 6475.00 40.23 40.15 0.08 32.43 32.43 -0.00 6500.00 39.61 39.51 0.10 31.95 32.10 -0.15 6525.00 39.58 39.42 0.16 32.21 32.25 -0.04 6550.00 39.74 39.69 0.05 31.86 32.32 -0.46 6575.00 39.95 39.95 -0.00 31.96 32.06 -0.10 6600.00 39.86 39.83 0.03 31.27 31.48 -0.21 6625.00 39.56 39.48 0.08 31.30 31.13 0.17 6650.00 39.43 39.26 0.17 30.98 31.26 -0.28 6675.00 39.50 39.45 0.05 31.18 31.29 -0.11 6700.00 39.63 39.59 0.04 30.76 31.20 -0.44 6725.00 39.45 39.46 -0.01 30.94 30.96 -0.02 6750.00 39.23 39.15 0.08 30,24 30.37 -0.13 6775.00 38.55 38.46 0.09 30.28 30.13 0.15 6800.00 38.74 38.57 0.17 29.99 30.25 -0.26 6825.00 38.62 38.54 0.08 30.38 30.51 -0.13 6850.00 38.36 38.21 0.15 30.17 30.56 -0.39 6875.00 37.93 37.95 -0.02 30.25 30.35 -0.10 6900.00 37.93 37.89 0.04 29.72 29.97 -0.25 6925.00 38.31 38.39 -0.08 29.59 29.43 0.16 6950.00 37.39 37.22 0.17 29.50 29.50 -0.00 6975.00 37.50 .37.42 0.08 29.90 29.99 -0.09 7000.00 37.40 37.14 0.26 29.73 30.01 -0.28 7025.00 37.03 37.01 0.02 29.94 30.16 -0.22 7050.00 37.05 36.99 0.06 29.46 29.80 -0.34 7075.00 36.93 37.03 -0.10 29.51 29.54 -0.03 7100.00 36.83 36.78 0.05 29.24 29.42 -0.18 7125.00 36.32 36.29 0.03 29.49 29.29 0.20 7150.00 36.33 36.21 0.12 29.11 29.17 -0.06 7175.00 36.02 35.92 0.10 29.37 29.18 0.19 7200.00 35.93 35.77 0.16 28.99 29.22 -0.23 7225.00 36.23 36.00 0.23 29.04 29.04 0.00 7250.00 35.84 35.75 0.09 28.54 28.85 -0.31 7275.00 35.71 35.54 0.17 28.65 28.81 -0.16 7300.00 35.75 35.84 -0.09 28.53 28.82 -0.29 7325.00 35.91 35.84 0.07 28.44 28.63 -0.19 7350.00 35.18 35.25 -0.07 28.16 28.23 -0.07 7375.00 35.21 35.12 0.09 27.87 27.96 -0.09 7400.00 34.91 34.95 -0.04 27.86 27.62 0.24 7425.00 34.75 34.66 0.09 27.64 27.67 -0.03 7450.00 34.50 34.34 0.16 27.59 27.31 0.28 7475.00 34.23 34.08 0.15 27.21 27.36 -0.15 7500.00 33.76 33.49 0.27 27.21 27.19 0.02 7525.00 33.61 33.55 0.06 27.14 27.26 -0.12 SURV-Q167 (OPS SUR-MA-003) 19`" N ov 03 /Rev 15 Page 5 of 8 AK0208G_312 Survey QC - RGS-CT•ecification Sheet ~,....~. 7550.00 33.88 33.68 0.20 27.39 27.61 -0.22 7575.00 33.45 33.40 0.05 27.31 27.42 -0.11 7600.00 33.26 33.12 0.14 27.02 27.35 -0.33 7625.00 33.07 33.02 0.05 27.36 27.38 -0.02 7650.00 32.93 33.02 -0.09 26.73 26.98 -0.25 7675.00 33.18 33.12 0.06 27.17 27.12 0.05 7700.00 32.73 32.80 -0.07 27.45 27.40 0.05 7725.00 32.44 32.29 0.15 27.44 27.42 0.02 7750.00 32.04 32.02 0.02 27.85 27.50 0.35 7775.00 31.77 31.67 0.10 27.90 27.91 -0.01 7800.00 31.76 31.57 0.19 28.33 28.07 0.26 7825.00 31.20 31.08 0.12 28.43 28.46 -0.03 7850.00 30.88 30.59 0.29 29.21 29.28 -0.07 7875.00 30.48 30.38 0.10 28.97 28.94 0.03 7900.00 30.34 30.15 0.19 29.31 29.67 -0.36 7925.00 29.95 29.78 0.17 30.69 30.66 0.03 7950.00 29.34 29.25 0.09 30.72 31.05 -0.33 7975.00 29.22 28.98 0.24 30.60 30.74 -0.14 8000.00 28.87 28.82 0.05 31.39 31.52 -0.13 8025.00 28.93 28.79 0.14 29.46 29.79 -0.33 8050.00 28.98 28.82 0.16 31.63 31.65 -0.02 8075.00 28.66 28.63 0.03 30.33 30.70 -0.37 8100.00 28.50 28.29 0.21 30.15 30.25 -0.10 8125.00 28.16 28.14 0.02 31.37 31.57 -0.20 8150.00 28.27 28.16 0.11 29.35 29.65 -0.30 8175.00 28.26 28.10 0.16 31.06 31.04 0.02 8200.00 28.02 28.00 0.02 30.72 30.87 -0.15 8225.00 27.81 27.60 0.21 30.12 30.20 -0.08 8250.00 27.52 27.52 -0.00 29.23 29.24 -0.01 8275.00 27.70 27.56 0.14 31.62 31.98 -0.36 8300.00 27.43 27.34 0.09 29.59 29.51 0.08 8325.00 27.22 27.17 0.05 30.38 30.61 -0.23 8350.00 27.15 26.92 0.23 30.66 30.88 -0.22 8375.00 26.86 26.83 0.03 29.22 29.10 0.12 8400.00 26.86 26.69 0.17 31.51 31.96 -0.45 8425.00 26.70 26.51 0.19 29.06 28.92 0.14 8450.00 26.30 26.24 0.06 30.74 30.88 -0.14 8475.00 26.39 26.14 .0.25 31.07 31.41 -0.34 8500.00 26.01 25.88 0.13 29.04 28.79 0.25 8525.00 26.02 25.91 0.11 31.48 31.82 -0.34 8550.00 25.84 25.59 0.25 29.39 29.47 -0.0$ 8575.00 25.64 25.57 0.07 30.29 30.18 0.11 8600.00 25.24 25.00 0.24 30.88 31.15 -0.27 8625.00 25.58 25.40 0.18 31.52 31.54 -0.02 8650.00 24.51 24.41 0.10 29.25 29.33 -0.08 SURV-Q167 (OPS SU R-MA-003) 19`" Nov 03 /Rev 15 Page 6 of 8 AK0208G 112 Survey QC - RGS-CT~cification Sheet 8675.00 25.20 24.98 0.22 29.81 29.91 -0.10 8700.00 24.94 24.84 0.10 31.46 31.49 -0.03 8725.00 24.29 24.13 0.16 30.55 30.73 -0.18 8750.00 24,41 24.19 0.22 29.73 29.78 -0.05 8775.00 24.46 24.30 0.16 32.10 32.05 0.05 8800.00 23.46 23.40 0.06 29.90 30.10 -0.20 8825.00 23.44 23.14 0.30 28.66 28.74 -0.08 8850.00 23.46 23.32 0.14 26.93 26.74 0.19 8875.00 24.37 24.24 0.13 24.33 24.43 -0.10 8900.00 25.81 25.60 0.21 21.45 21.29 0.16 8925.00 26.81 26.70 0.11 18.27 17.93 0.34 8950.00 27.60 27.46 0.14 16.23 16.16 0.07 8975.00 29.17 28.97 0.20 15.73 15.39 0.34 9000.00 30.22 30.18 0.04 16.26 15.86 0.40 9025.00 32.04 32.02 0.02 16.20 16.12 0.08 9050.00 33.86 33.68 0.18 15.73 15.45 0.28 9075.00 35.57 35.52 0.05 14.81 14.33 0.48 9100.00 37.32 .37.36 -0.04 13.61 13.35 0.26 9125.00 39.54 39.48 0.06 12.87 12.53 0.34 9150.00 41.18 41.20 -0.02 11.60 11.04 0.56 9175.00 42.62 42.70 -0.08 9.34 8.95 0.39 9200.00 44.51 44.44 0.07 8.31 7.92 0.39 9225.00 46.19 46.17 0.02 7.70 7.12 0.58 9250.00 47.91 48.10 -0.19 6.54 5.96 0.58 9275.00 50.04 50.12 -0.08 6.08 5.58 0.50 9300.00 51.92 51.89 0.03 6.46 5.69 0.77 9325.00 52.33 52.56 -0.23 5.76 5.00 0.76 9350.00 50.22 50.31 -0.09 4.01 3.39 0.62 9375.00 48.14 48.08 0.06 3.26 2.69 0.57 9400.00 48.81 48.84 -0.03 2.75 2.07 0.68 9425.00 50.60 50.61 -0.01 1.76 1.32 0.44 9450.00 53.18 53.14 0.04 1.41 0.74 0.67 9475.00 54.42 54.50 -0.08 1.29 0.81 0.48 9500.00 55.84 55.73 0.11 1.10 0.56 0.54 9525.00 57.05 57.07 -0.02 0.69 0.10 0.59 9550.00 59.47 59.45 0.02 0.40 359.73 0.67 9575.00 61.69 61.66 0.03 0.54 359.81 0.73 9600.00 63.06 63.08 -0.02 0.47 359.76 0.71 9625.00 63.05 63.06 -0.01 0.58 359.89 0.69 9650.00 62.90 62.92 -0.02 0.66 359.94 0.72 9655.84 62.87 62.87 0.00 0.00 0.00 0.00 Average 0.0501 -0.1378 Standard Deviation 0.1024 0.3349 Tolerance for both the Average and the Standard Deviation Casing 0.3° Drill i e 0.3° Casing 0.5° Drill i e 0.75° SURV-Q167 (OPS SUR-MA-003J 19`" Nov 03 J Rev 15 Page 7 of 8 AK0208G 112 Survey QC - RGS-CT~cification Sheet ~...®~ * Inclination and Azimuth interpolated to same depths as shown. SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 8 Of 8 AK0208G 112 Survey QC - RGS-CT~ceptance Sheet ®~.. FIELD AND SURVEY TNFnRMATTnN Operator gp Field /Platform Well Number DRILL SITE 12 12 - 13 Survey section From 3549.00 ft. to 9604.28 ft. Date 4/2/2008 Gyrodata Job No AK0208G 112 Gyrodata Surveyors Steve Thompson Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialise*_ion within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve with backu tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investi ate and comment if effects are ne ti ible Contact Duty Engineer to discuss options: Drift tunes. within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q766 (OPS SUR-MA-003) 13~" Nov 03 /Revision 12 Page 1 of 1 AK020SG_312 Survey QC - RGS-CT ~lysis Sheet ~` SURVEY QUALITY CONTROL -DATA ANALYSIS REFERENCE SYSTEMS Grid S stem Grid Correction 0.00 Azimuth reference: Grid /True North TRUE NORTH Vertical reference: RKB/MSL/Other RKB If other ive details TTF AN IIATA De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northin s 0.00 Eastin s 0.00 Latitude 70.2169 Az. Ref: Grid/True Grid Corrected Y/N? Descri tion CALIBRATION Tool Number 6007 Calibration Date 31 Jul 2007 OPERATING TEh1PERATURE Calibration ran a From 47.31 To 120.39 G ro o eratin ran a From 83.11 To 88.48 Sec' -Within calibration ran e FTELD ROI l TEST (Only valiri nn fivarl ctnirtiircc ~A/hon not n riF.1o i ..t roll tart .i~r~ .,ort..r...oa ~Ft~r rote... t,, tip.-..~ Cal value Pre "ob offset Post ob offset Abs dif.cal. ost Abs dif. re. ost Sec' Accel Scale 0.000000 0.000000 N A Cal Post - 0.00015 Mass Unbalance 0.00 0.00 N/A Pre/Post - 0.4° hr INITIALISATION De th A rox 3548.93 No of stns 6 Sec' -Min No. - 6 Azimuth Mean 35.14 Std deviation 0.02 Sec' - Azi SD 0.2° Inclination Mean 14.91 Std deviation 0.00 Sec' -Inc SD 0.1° Earth Horizontal Rate Mean Abs meas-theor 0.23 Std deviation 0.01 Sec' -See 167 DRIFT TUNE Residual x ro bias Mean 0.000 Std dev' 0.001 5 ec's -Mean and SD - 0.333°/hr Residual ro bias Mean _ 0.00.1 Std dev' 0.001 Spec's -Mean and SD - 0.333°/hr TOOLFACE RATE Maximum toolface rate 12.92 5 ec' - 400 sec IN/OUT COMPARISON fA7T' NIA TF TNC` t14°1 Inclination Difference Mean 0.05 Std dev' 0.10 Sec's -Casin 0.3°/Drill i e 0.3° Azimuth Difference Mean -0.14 Std dev' 0.33 Sec's -Casin 0.5°/Drill i e 0.75° Lateral Diver ence 1000 0.49 S ec - 5.0/1000 Vertical Diver ence/1000 0.28 Sec' - 2.0/1000 DEPTH CONTROL Wireline Com an Schlumber er Line e 7/32 Encoder SF Schlumber er Max De th TD 9650 CCL Corrected Yes Zero De th Ri u 40.02 feet at the base flan a Rezero De th -9.8 Given u "oint de th 2211.13 Measured PJ 2205.50 Strech cor. At TD divided b TD/1000 .83 5 ec' - 1.5/1000 Dif. Between ri u and rezero de the divided b TD/1000 1.02 Sec' - 2.0/1000 Dif. Between iven and meas de th divided b meas/1000 .54 Sec' - 2.0/1000 SURV-QifiS (OPS SUR-MA-Ol0) 22n° lan 2004 /Revision 20 Page 1 of 1 AK0208G_l12 . . WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: AOGCC Records Department 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 RE : Cased Hole/Open Hole/Mechanical Logs and / or Tubing Inspection(Caliper / MTI) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road :SCANNED Suite C Anchorage. AK 99518 Fax: (907) 245-8952 Ü 5 2DOe 1) 2) 3) 4) 5) 6) 7) EDE Disk F - 47A Coil Flag Jewelry Log 26-Dct-06 :JO(') -h3~ 1t /¿/é)?~ EDE Disk 0.5. 12 - 138 EDE Disk 0.5.07 - 29C Coil Flag 03.()ct-Oli ~ ~ - ~q (¿, -òa ~ I~ff)_- (19-Nov~ ~-/4.Q tt I(.f.;)-=J<-f Signed: () .Út-- (1j¡,~~H I/¡Q mo.h 1// kec .,,"'-') ( , .,,) 1\ / ,I ,/ Date : ", j Print Name: PRoAcTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAil; 'j,j,',,' ';;-;,'>, 3"C2tn~,'i;: ,ê,"" ::'3.',: ''\1' WEBSITE : ~I':1J¡j';\j.Nj:=,:vl::)j':~f~ .~' ,3. -:;-:,cj¡ I):"~ 00_ PI JSANC- 200(\Z W ord\DislJ1hlltion \l'ransmÍUa 1_ Sht:cI:;\ Transmit_ _ (.lrlg1l1'11.IJo(; MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, ~ Commissioner Tom Maunder, P. I. Supervisor DATE: May 7, 2001 FROM: Chuck Scheve; SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit Drill Site 12 Monday, May 7, 2001: i traveled to BPXs Drill Site 12 and witnessed the semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report indicates I witnessed the testing of 21 wells and 42 components with 1 failure. The surface safety valve on well 12-12 had a slow leak when pressure tested. This valve was serviced and retested by the operator on this date. Bill Preston (lead DS operator) performed the testing today; he demonstrated good test procedures and was a pleasure to work with. A walk through inspection of the well houses on this pad was performed during the SVS testing with no problems noted. All well houses inspected were reasonably clean and all equipment aPpeared to be in good condition. Summary: I witnessed the semi annual SVS testing at BPXs Drill Site 12. PBU DS 12, 21 wells, 42 components, 1 failure 2.3% failure rate 29 wellhouse inspections Attachment: SVS PBU DS 12 '5-7-01 CS X Unclassified Confidential (Unclassified if doc. removed ) Confidential SVS PBU DS 12 5-7-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Bill Preston AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Date: Field/Unit/Pad: Pmdhoe / PBU / DS 12 Separator psi: LPS 160 HPS 5/7/01 ! i!SSVi ' $$$V RetestWell Typ Weft Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE ., 12-01 1790230 12-02 1790320 12-03 1790410 160 150 150 P P OIL 12-04A 1811870 '160 150 15'0 P P oIL 12-05 1790550 12-06A 1920540 160 150! 150 P P OIL , , 12-07A 1811750 160 1501 140i P P OIL 12-08B 1811670 160 150 140 P P OIL 12-09 1800930 160 '150 125 ' P P OIL 12-10A 1920890 160 150 150 P P OIL i2-1! 1810730 " 15'12 1810830 160 ' '150 90 P 4 OIL , ,, 12-13B --~! 1960170 160 150 150 P P OIL 12-14A 1981460 160 150 150 P P OIL 1~-15 '' 1830320 160 150 150 P P " OIL ,, 12-16A 1931480 160 150 150 P P OIL 12-17 1830040 160 150 150 P P OIL !12-18 1822060 160 150 150 P P OIL 12-19 18219801 . 12-20 1821910~ ,, , 12-21 1840480! ,, 12-22 1840600! 160 150 125 P P OIL 12-23 1840580 , 12-25 1831660 ,, , , 12-26 1840140 160 150 125 e e OIL 15-27A 19~0390 "' 15-28A 1990330 160! 150 170 P e OIL , 12-29 1840320 12-30 188'1420 " ' 12-31 1890010 12-32 1890110 160 150 1501 P P 0IL 1~-33 1890100 ' ,, 12-34 1941370 160 150 150 P P OIL 12-35 1951300 160 150 100 12-36 1951580 160 150 '150 P P OIL RJF 1/16/01 Page 1 of 2 SVS PBU DSI2 5-7-~C~S IWell ! Permit ] Separ Set I Number I Number / PSI PSI Wells: 21 Components: L/P I Test Trip Code 42 Failures: Test ] Test/ Date ' Code / Code / Passed 1 Failure Rate: 'Well. Type- ~- I ~'i'l, W'A 'G, 'G~NJi i GAS or CYCLE 2.38% I--] 90 Day Remarks: Surface Safety Valve on well 12-12 had slow leak when pressure tested. RJF 1/16/01 Page 2 of 2 SVS PBU DS12 5-7-01 CS PERMZ"I" DATA 96-017 7035 96-017 7036 96-017 7037 96-017 NGP 96-017 NGP 96-017 NGP 96-017 ROP/NGP 96-017 ROP/NGP AOGCC Individual Well Geological Materials Inventory Page: 1 Date: 02/25/98 T DATA PLUS RUN RECVD /~ SPERRY'S FM EVAL ~'.'.'.?,i¥ - ~ ~)'7 04/29/96 SPERRY' S FM EVAL ~ 7[ ~{ -; ~ .%,¢'4 04/29/96 /MWD SPERRY' ~'~SPERRY-TVD SPERRY T~ SPERRY ~ ~ SPERRY-MD ~PERRY-MD SPERRY MD 04/29/96 05/09/96 05/09/96 05/09/96 05/09/96 05/09/96 05/09/96 10-407 ~OMPLETION DATE 2/2)/q~ / DAILY WELL OPS R / /~/ ~/ TO ~-/2q/~/ Are dry ditch samples required? yes ~ And received? Was the well cored? yes ~ Analysis & description received? les no-- Are well tests required? yes ~ Received? Well is in compliance ~ Initial COMMENTS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG .. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 96-17 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ._ 50-029-20614-02 4. Location of well at surface ~J'';:'~r'''~::"''~=~ ~[~ ~ ~'~--:~' --; 9. Unit or Lease Name 1134' NSL, 759' WEL, SEC. 18, T10N, alEE ~'~//¢.4,~ ~' ....... - . of productive interval ! '~/,~/.-.~-~.~.~ ~ ~ ?;~ 'i Bay Unit Prudhoe At top . . 10. Well Number NS,, s o. 10N, At total depth i...:LL ~ .7~;~ ;?'~:;~:?.~ l~, ~.~-.~.~---.,. 11. Field and Pool 5177' NSL, 2229' EWL, SEC. 17, T10N, R15E ;-~-~"~ .......... Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE: 74.52, ADL 028330 12. Date Spudded01/31/96 I 13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °ffsh°re 16' N°' °f C°mpleti°ns02/19/96 02/23/96 N/A MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set,_1. Thickness of Permafrost 11683 8711 FT 11683 8711 FT~ [] Yes [] No I 2221' MD ! 1900' (Approx.) 22. Type Electric or Other Logs Run LWD (DIP/FL), GR 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-Iq'OM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 110' 32" 300 sx Permafrost 13-3/8 72# L-80 Surface' 2671' 17-1/2" 2900 sx Fondu, 400 sx Permafrost 9-5/8" 47# L-80/S0095 Surface 8796' 12-1/4" :500 sx Class 'G' 7" 29# L-80 8667' 10477' 8-1/2" 350 sx Class 'G' 4-1/2" 12.6# L-80 10351' 11683' 6" Uncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 3-1/2" 9547' 9509' MD TVD MD TVD 10440' - 11660' 8740' - 8711' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect w/175 Bbls of Diesel 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) March 3, 1996 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing PressureCALCULATED I~ OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED ~AY 1 6 1996 ORIGINALAlaska 0il & Gas Cons. c°mmissi°n Anchor~9~ Form 10-407 Rev. 07-01-80 Submit In Dupplicate Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 10824' 8737' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Tern/Jordan Title Senior Drilling Engineer Date / ' Prepared By Name/Number Terrie Hubble, 564-4628 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. I'rEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of OperatiOn: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. RECEIVED Form 10-407 Rev. 07-01-80 MAY 1 6 1996 Alaska 0il & Gas Cons. commission Anchorage SUMMARY OF DAILY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: 1 2-1 3 B Rig Name: Doyon 14 AFE: Accept Date: 01/2 9/9 6 Spud Date: 01/31/9 6 Release Date: 4J0317 O2~23/96 Jan 29 1996 (2) Skid rig. Rig moved 100 %. Rigged up Drillfloor / Derrick. Jan 30 1996 (3) Held safety meeting. Rigged up Kill manifold. Rigged down Surface tree. Rigged up BOP stack. Rigged up Lubricator. Rigged down Lubricator. Rigged down Production equipment. Tested BOP stack. Rigged up BOP stack. Rigged up Kelly. Made up BHA no. 1. Circulated at 2200 ft. R.I.H. to 5124 ft. Circulated at 5124 ft. R.l.H.to 6000 ft. Jan 31 1996 (4) R.I.H. to 8402 ft. Reamed to 8680 ft. Circulated at 8680 ft. Tested BOP stack. Drilled cement to 8727 ft. Drilled cement to 8809 ft. Circulated at 8809 ft. Pulled BHA. Made up BHA no. 2. R.I.H. to 8809 ft. Serviced Block line. Drilled to 8811 ft. Feb I 1996 (5) Drilled to 8899 ft. Circulated at 8899 ft. Drilled to 9034 ft. Circulated at 9034 ft. Pulled BHA. Made up BHA no. 3. Feb 2 1996 (6) R.I.H. to 8730 ft. Held drill (Spill). R.I.H. to 9034 ft. Drilled to 9709 ft. Feb 3 1996 (7) Drilled to 9833 ft. Circulated at 9833 ft. Pulled BHA. Made up BHA no. 4 . R.I.H. to 9656 ft. Laid down 186 ft of 5 in OD drill pipe. Reamed to 9833 ft. Logged hole with LWD: DIR/FE from 9820 ft to 9833 ft. Drilled to 9860 ft. Feb 4 1996 (8) Drilled to 10325 ft. RECEIVED MAY 1 ~ 1996 0il & Gas Cons. C01nmission Anchorage ~,perations Summary for: Feb 5 1996 (9) Drilled to 10325 ft. Pulled out of hole to 10252 ft. Circulated at 10252 ft. Worked toolstring at 10252 ft. Circulated at 10272 ft. Feb 6 1996 (10) Circulated at 10272 ft. Circulated at 10272 ft. Worked tool string at 10004 ft. Feb 7 1996 (11) Worked toolstring at 8802 ft. Circulated at 8802 ft. Pulled BHA. Tested BOP stack. Held safety meeting. Tested BOP stack, Held safety meeting. Tested BOP stack. Made up BHA no. 5. R.I.H. to 1700 ft. Serviced Block line. R.I.H. to 8802 ft. Circulated at 8802 ft. Feb 8 1996 (1) R.I.H. to 9313 ft. Drilled to 9343 ft. Reamed to 9343 ft. Drilled to 9374 ft. Circulated at 9374 ft. Pulled out of hole to 7514 ft. Held safety meeting. Held drill (Spill). Feb 9 1996 (2) Pulled out of hole to 0 ft. Made up BHA no. 2. R.I.H. to 9291 ft. Washed to 9374 ft. Drilled to 9810 ft. Held safety meet ing. Held drill (H2S). Feb 10 1996 (3) Drilled to 9919 ft. Circulated at 9919 ft. Pulled out of hole to 9200 ft. R.I.H. to 9919 ft. Drilled to 10198 ft. Held safety meeting. Held drill (Fire). Feb 11 1996 (4) Drilled to 10353 ft. Circulated at 10353 ft. Pulled out of hole to 200 ft. Downloaded MWD tool. R.I.H. to 8800 ft. Serviced Block line. R.I.H. to 10156 ft. Held safety meeting. Held drill (Spill). Feb 12 1996 (5) R.I.H. to 10200 ft. Circulated at 10200 ft. Reamed to 10353 ft. Worked toolstring at 10353 ft. Drilled to 10467 ft. Circulated at 10467 ft. Held safety meeting. Held drill (Fire). Page 2 RECEIVED MAY 1 G 1996 Alaska 0il & Gan Cons. CoIn~f~ission Anchorage .,perations Summary for: Feb 13 1996 (6) Worked toolstring at 10400 ft. Circulated at 10400 ft. Washed to 10467 ft. Drilled to 10477 ft. Circulated at 10477 ft. Pulled out of hole to 9400 ft. R.I.H. to 10477 ft. Circulated at 10477 ft. Pulled out of hole to 200 ft. Pulled BHA. Made up BHA no. 4. R.I.H. to 9770 ft. Held safety meeting. Held drill (Fire). Feb 14 1996 (7) R.I.H. to 10360 ft. Reamed to 10477 ft. Circulated at 10477 ft. Pulled out of hole to 200 ft. Pulled BHA. Ran Casing to 1786 ft (7 in OD). Ran Drillpipe in stands to 8800 ft. Circulated at 8800 ft. Ran Drillpipe in stands to 10477 ft. Held safety meeting. Held drill (Kick while tripping). Feb 15 1996 (8) Circulated at 10477 ft. Mixed and pumped slurry- 74 bbl. Reverse circulated at 8667 ft. Pulled Drillpipe in stands to 0 ft. Retrieved Wear bushing. Tested Well control. Installed Wear bushing. Made up BHA no. 5. R.I.H. to 8600 ft. Serviced Block line. R.I.H. to 10298 ft. Tested Casing - Via annulus and string. Functioned downhole tools at 10298 ft. Drilled cement to 10377 ft. Held safety meeting. Held drill (Spill). Feb 16 1996 (9) Drilled cement to 10477 ft. Drilled to 10487 ft. Circulated at 10487 ft. Drilled to 10884 ft. Circulated at 10884 ft. Held safety meeting. Held drill (Fire). Feb 17 1996 (10) Circulated at 10884 ft. Pulled out of hole to 200 ft. Pulled BHA. Ran Drillpipe in stands to 10884 ft. Circulated at 10884 ft. Mixed and pumped slurry- 22 bbl. Pulled Drillpipe in stands to 10150 ft. Reverse circulated at 10150 ft. Pulled out of hole to 0 ft. R.I.H. to 10100 ft. Serviced Block line. Held drill (H2S). Feb 18 1996 (11) Serviced Block line. R.I.H. to 10157 ft. Drilled cement to 10482 ft. Drilled to 10500 ft. Drilled to 10998 ft. Held drill (Fire). Page RECEIVED MAY 1 6 1996 Alaska 0il & Gas rJons. Corr~mission Anchorage .~perations Summary for: Feb 19 1996 (12) Drilled to 11092 ft. Circulated at 11091 ft. Pulled out of hole to 0 ft. Made up BHA no. 7. R.I.H. to 4800 ft. Serviced Block line. R.I.H. to 11091 ft. Drilled to 11433 ft. Held safety meeting. Held drill (H2S). Feb 20 1996 (13) Drilled to 11683 ft. Circulated at 11683 ft. Pulled out of hole to 200 ft. Pulled BHA. R.I.H. to 10477 ft. Reamed to 11345 ft. Held safety meeting. Held drill (Kick while tripping). Feb 21 1996 (14) Reamed to 11683 ft. Pulled out of hole to 10450 ft. R.I.H. to 11683 ft. Circulated at 11683 ft. Pulled out of hole to 0 ft. Rigged up Casing handling equipment. Ran Casing to 1330 ft (4.5 in OD). Ran Drillpipe in stands to 10450 ft. Held safety meeting. Feb 22 1996 (15) Ran Casing to 11683 ft (4.5 in OD). Set Liner hanger at 10351 ft with 3000 psi. Circulated at 10344 ft. Pulled Drillpipe in stands to 10351 ft. Circulated at 10351 ft. Laid down Drillpipe of 10351 ft. Retrieved Wear bushing. Serviced Middle ram. Rigged up Tubing handling equipment. Held safety meeting. Ran Tubing to 300 ft (3.5 in OD). Feb 23 1996 (16) Ran Tubing to 9546.54 ft (3.5 in OD). Ran Tubing on landing string to 9546.54 ft. Circulated at 9546.54 ft. Set packer at 9509 ft with 4000 psi. Rigged up Lubricator. Rigged down BOP stack. Rigged up Surface tree. Retrieved BOP test plug assembly. Feb 24 1996 (17) Retrieved BOP test plug assembly. Circulated at 2400 ft. Rigged down Fluid system. Page 4 S~;RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/12-13B 500292061402 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SURVEY: 021996 MWD SURVEY JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES VERT. DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10464.73 8744.89 8670.37 10482.00 8747.75 8673.23 10493.96 8749.44 8674.92 10524.81 8751.88 8677.37 10556.16 8752.04 8677.52 79 54 81 1 82 45 88 9 91 17 N 56.60 E .00 N 57.33 E 7.66 N 57.70 E 14.79 N 58.84 E 17.89 'N 62.29 E 14.88 3688.33N 1828.47E 4071.78 3697.61N 1842.75E 4087.56 3703.97N 1852.73E 4098.48 3720.14N 1878.88E 4126.68 3735.54N 1906.18E 4154.92 10585.79 8751.48 8676.96 10616.73 8751.17 8676.65 10634.49 8751.03 8676.51 10647.94 8750.78 8676.26 10679.20 8748.94 8674.42 90 51 N 67.20 E 16.63 90 16 N 72.08 E 15.88 90 39 N 72.69 E 4.02 91 26 N 74.14 E 12.31 95 19 N 76.45 E 14.41 3748.18N 1932.96E 4180.59 3758.94N 1961.96E 4205.99 3764.31N 1978.88E 4220.07 3768.15N 1991.77E 4230.58 3776.07N 2021.95E 4254.32 10710.27 8745.91 8671.39 10741.74 8742.94 8668.42 10772.69 8740.32 8665.80 10804.80 8737.99 8663.47 10835.87 8736.10 8661.58 95 52 N 76.73 E 1.98 94 56 N 74.44 E 7.81 94 46 N 75.06 E 2.08 93 32 N 75.05 E 3.83 93 27 N 75.40 E 1.15 3783.24N 2052.02E 4277.39 3791.04N 2082.36E 4301.12 3799.15N 2112.11E 4324.78 3807.41N 2143.05E 4349.23 3815.32N 2173.04E 4372.85 10867.48 8734.40 8659.88 10898.36 8732.97 8658.45 10929.51 8731.56 8657.04 10960.43 8730.22 8655.70 10991.76 8728.97 8654.45 92 40 N 74.94 E 2.86 92 39 N 75.29 E 1.14 92 31 N 75.09 E .76 92 27 N 75.17 E .32 92 5 N 74.67 E 1.97 3823.40N 2203.55E 4396.92 3831.32N 2233.36E 4420.45 3839.27N 2263.45E 4444.16 3847.20N 2293.30E 4467.73 3855.35N 2323.53E 4491.68 11022.62 8727.83 8653.31 11053.54 8726.60 8652.08 11085.11 8725.26 8650.74 11116.17 8724.14 8649.62 11149.29 8723.15 8648.63 92 9 N 74.40 E .89 92 24 N 74.66 E 1.17 92 28 N 75.66 E 3.17 91 39 N 74.56 E 4.40 91 45 N 74.80 E .79 3863.57N 2353.25E 4515.41 3871.81N 2383.03E 4539.18 3879.89N 2413.52E 4563.23 3887.86N 2443.51E 4586.91 3896.61N 2475.44E 4612.33 11178.15 8722.12 8647.60 11208.87 8720.76 8646.25 11239.86 8719.72 8645.20 11270.69 8719.09 8644.57 11302.05 8718.41 8643.89 92 21 N 72.84 E 7.10 92 40 N 74.80 E 6.46 91 10 N 73.58 E 6.26 91 10 N 74.03 E 1.46 91 19 N 73.93 E .55 3904.65N 2503..14E 4634.75 3913.20N 2532.61E 4658.60 3921.63N 2562.40E 4682.55 3930.23N 2592.00E 4706.52 3938.88N 2622.14E 4730.83 11333.77 8717.57 8643.05 11364.61 8716.50 8641.98 11395.38 8715.17 8640.65 11427.03 8714.00 8639.48 11458.43 8713.17 8638.65 91 43 N 73.87 E 1.28 92 15 N 74.97 E 3.96 92 42 N 74.38 E 2.43 91 30 N 74.88 E 4.11 91 30 N 74.96 E .25 3947.68N 2652.60E 4755.46 3955.96N 2682.29E 4779.21 3964.08N 2711.94E 4802.81 3972.46N 2742.43E 4827.12 3980.63N 2772.74E 4851.13 RECEIVED MAY 1 6 1996 Alaska Oil & Gas Cons. Commission Anchorage S~RRY-SUN DRILLING SERVICES kNCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/12-13B 500292061402 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SURVEY: 021996 MWD SURVEY JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 11490.04 8712.35 8637.83 91 28 N 74.05 E 2.88 11520.84 8711.88 8637.36 90 16 N 73.17 E 4.83 11550.61 8711.77 8637.25 90 9 N 73.62 E 1.57 11582.25 8711.66 8637.14 90 15 N 73.76 E .55 11613.89 8711.47 8636.95 90 25 N 74.09 E 1.19 3989.07N 2803.19E 4875.46 3997.76N 2832.73E 4899.47 4006.27N 2861.26E 4922.75 4015.15N 2891.63E 4947.39 4023.91N 2922.03E 4971.95 11646.32 8711.22 8636.71 90 25 N 74.03 E .18 11683.00 8710.95 8636.43 90 25 N 74.00 E .08 4032.82N 2953.21E 4997.07 4042.92N 2988.47E 5025.50 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5027.54 FEET AT NORTH 36 DEG. 28 MIN. EAST AT MD = 11683 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 34.84 DEG. TIED INTO 12-13BPB2 AT 10464.73' KICKOFF POINT 10482' INTERPOLATED DEPTH 11683' NOTE: TIE IN AZIMUTH WAS INTERPOLATED DUE TO CASING INTERFERENCE. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/12-13B 500292061402 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SURVEY: 021996 JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10464.73 8744.89 8670.37 11464.73 8713.01 8638.49 11683.00 8710.95 8636.43 3688.33 N 1828.47 E 1719.84 3982.26 N 2778.82 E 2751.72 1031.88 4042.92 N 2988.47 E 2972.05 220.33 THE CALCUTJ~TION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANC~{OPd%GE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/12-13B 500292061402 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SI/RVEY: 021996 JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGU~ COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10464.73 8744.89 8670.37 11683.00 8710.95 8636.43 3688.33 N 1828.47 E 1719.84 4042.92 N 2988.47 E 2972.05 1252.21 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SH/LRED SERVICES DRILLING PBU/12-13BPB1 500292061470 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 7/96 DATE OF SURVEY: 020496 MWD SURVEY JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGUL~LR COORDINATE DEGREES DG/100 NORTH/SOUTH EAST/WEST 8800.82 7913.27 7838.75 23 55 N 21.87 E .00 2484.35N 1382.05E 8809.00 7920.73 7846.21 24 27 N 21.90 E 6.48 2487.46N 1383.30E 8923.27 8023.74 7949.22 26 51 N 17.00 E 2.81 2534.10N 1399.67E 9016.27 8104.79 8030.27 31 49 N 13.52 E 5.64 2578.06N 1411.55E 9111.72 8182.46 8107.94 39 9 N 11.12 E 7.83 2632.17N 1423.27E S VERT. SECT. 2828.58 2831.84 2879.48 2922.35 2973.45 9173.87 8229.30 8154.78 43 1 N 7.24 E 7.46 2672.49N 1429.73E 9236.85 8273.59 8199.07 47 33 N 4.93 E 7.65 2716.98N 1434.43E 9297.56 8312.58 8238.06 52 29 N 5.01 E 8.12 2763.32N 1438.46E 9391.14 8363.71 8289.19 61 12 N 6.08 E 9.37 2841.22N 1446.06E 9484.82 8408.94 8334.42 61 2 N 6.23 E .23 2922.78N 1454.86E 3010.23 3049.44 3089.77 3158.05 3230.01 9578.72 8454.87 8380.35 60 24 N 6.47 E .72 3004.18N 1463.92E 9671.86 8501.67 8427.16 59 15 N 6.20 E 1.25 3084.21N 1472.80E 9764.65 8550.07 8475.55 57 51 N 7.96 E 2.21 3162.76N 1482.55E 9800.82 8569.50 8494.98 57 9 N 7.39 E 2.35 3192.99N 1486.62E 9831.72 8586.18 8511.66 57 30 N 8.43 E 3.05 3218.75N 1490.20E 3302.00 3372.76 3442.79 3469.94 3493.13 9864.06 8603.24 8528.72 58 50 N 13.08 E 12.89 3245.74N 1495.34E 9894.90 8618.83 8544.31 60 27 N 18.23 E 15.34 3271.35N 1502.53E 9925.36 8633.36 8558.84 62 32 N 22.95 E 15.25 3296.39N 1511.95E 9957.36 8647.47 8572.95 65 8 N 27.10 E 14.18 3322.40N 1524.10E 9988.32 8659.85 8585.33 67 45 N 31.16 E 14.70 3347.18N 1537.92E 3518.21 3543.33 3569.27 3597.56 3625.79 10020.18 8671.19 8596.67 70 32 N 34.11 E 12.29 3372.24N 1553.98E 10049.96 8680.41 8605.89 73 23 N 37.09 E 13.49 3395.26N 1570.46E 10081.74 8688.93 8614.41 75 30 N 41.14 E 13.97 3419.00N 1589.78E 10112.17 8695.99 8621.47 77 40 N 45.42 E 15.43 3440.54N 1610.07E 10141.76 8701.72 8627.20 79 58 N 48.60 E 13.10 3460.33N 1631.30E 3655.54 3683.85 3714.37 3743.64 3772.01 10172.99 8706.36 8631.84 82 55 N 51.65 E 13.51 3480.12N 1655..00E 10204.78 8709.63 8635.11 85 15 N 55.21 E 13.33 3498.96N 1680.39E 10236.69 8712['08 8637.57 85 55 N 58.70 E 11.10 3516.30N 1707.06E 10268.13 8714.17 8639.65 86 28 N 58.55 E 1.78 3532.64N 1733.84E 10299.06 8715.95 8641.43 86 55 N 58.58 E 1.46 3548.74N 1760.19E 3801.79 3831.76 3861.23 3889.93 3918.20 10330.38 8717.81 8643.29 86 16 N 58.74 E 2.14 3565.00N 1786.89E 10346.80 8718.95 8644.43 85 46 N 58.68 E 3.07 3573.51N 1800.89E 10418.00 8724.20 8649.68 85 46 N 58.68 E .00 3610.42N 1861.54E 3946.80 3961.78 4026.73 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4062.08 FEET AT NORTH 27 DEG. 16 MIN. EAST AT MD = 10418 RECEIVED VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 34.84 DEG. TIE IN POINT 8800.82' KICK OFF POINT 8809' INTERPOLATED DEPTH 10418' MAY "1 6 1996 Aiask~ Oil & Ga~ Cons. Commission Anchorage S~ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/12-13BPB1 500292061470 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 7/96 DATE OF SURVEY: 020496 JOB N-UMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTkNGULA_R COORDINATES MD-TV/D VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 8800.82 9800.82 10418.00 7913.27 7838.75 8569.50 8494.98 8724.20 8649.68 2484.35 N 1382.05 E 887.55 3192.99 N 1486.62 E 1231.32 343.77 3610.42 N 1861.54 E 1693.80 462.48 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. S.-ERRY-SUN DRILLING SERVICES ANCHOP~AGE ALASKA PAGE SEARED SERVICES DRILLING PBU/12-13BPB1 500292061470 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 7/96 DATE OF SURVEY: 020496 JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8800.82 7913.27 7838.75 2484.35 N 1382.05 E 887.55 8868.39 7974.52 7900.00 2511.03 N 1392.12 E 893.87 6.32 8981.00 8074.52 8000.00 2560.51 N 1407.14 E 906.48 12.61 9101.54 8174.52 8100.00 2625.93 N 1422.02 E 927.02 20.54 9238.26 8274.52 8200.00 2718.04 N 1434.52 E 963.74 36.72 9413.59 8374.52 8300.00 2860.79 N 1448.15 E 1039.07 75.33 9618.50 8474.52 8400.00 3038.55 N 1467.82 E 1143.99 104.91 9810.10 8574.52 8500.00 3200.72 N 1487.66 E 1235.58 91.59 10030.68 8674.52 8600.00 3380.39 N 1559.71 E 1356.16 120.58 10418.00 8724.20 8649.68 3610.42 N 1861.55 E 1693.80 337.64 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SFERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/12-13BPB2 500292061471 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SURVEY: 021696 MWD SURVEY JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9297.56 8312.74 8238.22 9313.00 8321.99 8247.47 9333.33 8334.47 8259.95 9365.32 8355.31 8280.79 9397.30 8376.30 8301.78 52 29 53 55 50 19 48 21 49 34 N 5.01 E .00 2762.79N 1438.56E N 5.19 E 9.37 2775.11N 1439.66E N 2.19 E 21.23 2791.11N 1440.70E N 1.75 E 6.22 2815.36N 1441.54E N 1.18 E 4.05 2839.48N 1442.15E 3089.39 3100.13 3113.86 3134.24 3154.39 9427.49 8395.23 8320.71 9459.55 8414.17 8339.65 9490.37 8431.67 8357.15 9521.94 8448.74 8374.22 9553.16 8464.37 8389.85 52 44 54 50 55 57 58 33 61 20 N .28 E 10.72 2862.99N 1442.45E N .19 E 6.59 2888.85N 1442.55E N .24 W 3.75 2914.22N 1442.54E N 1.00 W 8.51 2940.77N 1442.25E N .86 W 8.94 2967.79N 1441.81E 3173.85 3195.14 3215.95 3237.58 3259.50 9584.41 8478.93 8404.41 9615.81 8493.22 8418.70 9645.86 8507.02 8432.50 9676.85 8521.05 8446.53 9708.08 8534.27 8459.75 63 7 62 44 62 32 63 37 66 18 N .80 W 5.67 2995.43N 1441.41E N 1.65 W 2.70 3023.39N 1440.82E N .02 E 4.98 3050.07N 1440.44E N .90 E 4.28 3077.70N 1440.66E N 4.00 E 12.45 3105.96N 1441.88E 3281.96 3304.56 3326.25 3349.05 3372.95 9738.43 8545.77 8471.25 9769.64 8556.46 8481.94 9800.32 8566.37 8491.85 9831.36 8576.07 8501.55 9860.30 8584.80 8510.28 69 8 70 48 71 31 72 3 72 52 N 6.35 E 11.76 3133.93N 1444.42E N 8.50 E 8.38 3163.00N 1448.21E N 10.32 E 6.10 3191.64N 1452.96E N 15.10 E 14.72 3220.39N 1459.44E N 18.12 E 10.35 3246.83N 1467.33E 3397.35 3423.38 3449.60 3476.90 3503.11 9893.36 8594.59 8520.07 9924.40 8603.92 8529.40 9954.46 8613.15 8538.63 9986.17 8623.09 8548.57 10016.40 8632.56 8558.04 72 39 72 23 71 50 71 37 71 51 N 18.78 E 2.01 3276.79N 1477.32E N 20.56 E 5.54 3304.66N 1487.29E N 25.25 E 14.96 3331.01N 1498.42E N 27.06 E 5.47 3358.03N 1511.69E N 29.22 E 6.83 3383.34N 1525.23E 3533.40 3561.97 3589.95 3619.71 3648.22 10047.68 8642.06 8567.54 10078.99 8651.14 8576.62 ~ 10108.80 8659.42 8584.90 10138.89 8667.28 8592.76 10170.23 8675.21 8600.69 72 48 73 28 74 17 75 25 75 16 N 33.98 E 14.81 3408.72N 1540..84E N 35.94 E 6.36 3433.27N 1558.01E N 37.49 E 5.70 3456.22N 1575.13E N 40.19 E 9.44 3478.84N 1593.34E N 41.41 E 3.80 3501.79N 1613.15E 3677.97 3707.93 3736.54 3765.51 3795.67 10202.37 8683.42 8608.90 10233.30 8691.45 8616.93 10264.62 8699.69 8625.17 10297.41 8708.24 8633.72 10325.75 8715.47 8640.95 75 8 74 44 74 46 74 59 75 26 N 43.52 E 6.36 3524.71N 1634.13E N 46.46 E 9.27 3545.83N 1655.24E N 48.32 E 5.73 3566.29N 1677.48E N 47.05 E 3.79 3587.60N 1700.88E N 48.86 E 6.38 3605.95N 1721.23E 3826.46 3855.86 3885.35 3916.21 3942.90 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/12-13BPB2 500292061471 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SURVEY: 021696 MWD SURVEY JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10356.49 8722.91 8648.39 76 31 N 49.18 E 3.69 3625.50N 1743.75E 10387.70 8729.84 8655.32 77 50 N 51.57 E 8.57 3644.91N 1767.18E 10418.38 8735.91 8661.39 79 19 N 54.62 E 10.87 3662.96N 1791.23E 10451.70 8741.98 8667.46 79 41 N 56.00 E 4.23 3681.61N 1818.17E 10464.73 8744.29 8669.77 79 54 N 56.60 E 4.81 3688.72N 1828.84E 3971.81 4001.13 4029.68 4060.38 4072.31 10495.42 8749.14 8674.62 81 52 N 57.90 E 7.66 3705.11N 1854.32E 10527.15 8752.14 8677.62 87 15 N 59.30 E 17.51 3721.56N 1881.27E 10558.70 8752.49 8677.97 91 28 N 61.73 E 15.43 3737.08N 1908.72E 10590.35 8751.84 8677.32 90 51 N 66.77 E 16.04 3750.83N 1937.21E 10621.18 8751.57 8677.05 90 9 N 72.22 E 17.83 3761.62N 1966.08E 4100.32 4129.22 4157.64 4185.20 4210.55 10652.85 8751.54 8677.02 89 58 N 72.52 E 1.11 3771.21N 1996.26E 10681.95 8751.60 8677.08 89 46 N 72.24 E 1.16 3780.02N 2024.00E 10713.78 8751.81 8677.29 89 28 N 72.79 E 1.97 3789.59N 2054.35E 10744.81 8752.60 8678.08 87 34 N 72.94 E 6.14 3798.72N 2083.99E 10775.62 8754.23 8679.71 86 22 N 72.62 E 4.03 3807.83N 2113.38E 4235.66 4258.74 4283.93 4308.36 4332.63 10806.55 8756.55 8682.03 85 1 N 73.47 E 5.18 3816.83N 2142.88E 10837.55 8759.33 8684.81 84 40 N 72.28 E 3.98 3825.92N 2172.38E 10884.00 8763.63 8689.12 84 40 N 72.30 E .04 3839.99N 2216.44E 4356.86 4381.18 4417.89 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4433.75 FEET AT NORTH 29 DEG. 59 MIN. EAST AT MD = 10884 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 34.84 DEG. TIED INTO 12-13BPB1 AT 9297.56 KICKOFF POINT AT 9313' INTERPOLATED DEPTH 10884' SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/12-13BPB2 500292061471 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SURVEY: 021696 JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9297.56 10297.56 10884.00 8312.74 8238.22 8708.28 8633.76 8763.63 8689.12 2762.79 N 1438.56 E 984.82 3587.70 N 1700.99 E 1589.28 604.46 3839.99 N 2216.44 E 2120.37 531.08 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/12-13BPB2 500292061471 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/ 1/96 DATE OF SURVEY: 021696 JOB NUMBER: AK-MW-60016 KELLY BUSHING ELEV. = 74.52 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9297.56 8312.74 8238.22 9394.57 8374.52 8300.00 9574.76 8474.52 8400.00 9826.38 8574.52 8500.00 2762.79 N 1438.56 E 984.82 2837.41 N 1442.11 E 1020.05 35.23 2986.85 N 1441.54 E 1100.24 80.19 3215.79 N 1458.36 E 1251.86 151.63 10167.52 8674.52 8600.00 10884.00 8763.63 8689.12 3499.83 N 1611.42 E 1493.00 241.14 3839.99 N 2216.44 E 2120.37 627.37 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS O I:! I I--I-- I IM G S E I::i ~/I I-- E S WELL LOG TRANSMITTAL To: State of Alaska May 07, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Records Keeper 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs DS 12-13B, 12-13B PB1, & 12-13B PB2, AK-MW-60016 The technical data listed below is being submitted herewith. Please address any problems or concems to the attention of~ Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 ~[-,,,~'/ DS 12-13B: ~2"x 5" MD Gamma Ray Logs: 50-029-20614-02 ,~2" x 5" TVD Gamma Ray Logs: 50-029-20614-02 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia DS 12-13B PBh /2"x 5" MD Gamma Ray Logs: 50-029-20614-70 t! 5tl ,/ x TVD Gamma Ray Logs: 50-029-20614-70 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia DS 12-13B PB2: 2" x 5" MD Gamma Ray Logs: 50-029-20614-71 1 Blueline 1 Folded Sepia ~ 2" x 5" TVD Gamma Ray Logs: 50-029-20614-71 1 Blueline 1 Folded Sepia r~v 0 9 1996 ~.¢~:~i<~; Oi! & Gas Cons, Commissior~ 5631 Silverado Way. Suite G · Anchorage. gaska 99518 · (907) 563-3256 · F~ (907) 563-7252 A Dresser Industries, Inc. Company DF:III--I--lNG SE FIU'I i-- E S To: WELL LOG TRANSMITTAL State of Alaska Attn: Larry Grant, AOGCC 3001 Porcupine Dr. Anchorage, Alaska 99501 April 29,1996 RE: MWD Formation Evaluation Tapes - 12-13BPB1, 12-13BPB2,& 12-13B AK-MW-60016 The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a signed copy of this transmittal letter to the attention Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 3 LDWG formatted magnetic tapes with LIS listings (B.C. #s: 1003901774, 1003901775, & 1003901776 respectively). 5631 Silverado Way, Suite G · Anchorage, Alaska99518 · (9.07)563-3256 · Fax (907)563-7252 A Dresser Industries, Inc, Company March 7, 1996 AOGCC Larry Grant 3001 Porcupine Dr Anchorage, AK 99501 Re: l~distribution of Survey Data 12-13B /7 Dear Mr. Grant, Enclosed are two hard copies of the above memioned file(s). Well 12-13BPB1 MWD survey, tie in point 8800.82', window point 8809', interpolated depth 10418' Well 12-13BPB2 MWD survey, tied into 12-13BPB1 at 9297.56', kickoff point 9313', interpolated depth 10884' Well 12-13B MWD survey, tied into 12-13BPB2 at 10464.73, kickoff point 10482', interpolated depth 11683' Please call me at 563-3256 if you have any questions or concerns. Regards, Sandra Lufkin Dept. Specialist Attachments. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company AI,ASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Januaw 25.!996 Dan Stoitz. Sr Drilling Engineer ARCO Alaska, !nc. P O Box 196612 Anchorage. AK 99519-6612 Pmdhoe Bay Unit 12-13B ARCO Alaska, Inc. Permit No 96-17 Surf Loc 1134'NSL, 760'WEL, Sec. 18, T10N, R15E, UM Btmhole Loc 5026'NSL, 3234'WEL, Sec. 17, T10N, R15E,UM Dear Mr. Stoltz: Enclosed is the approved application for permit to re-ddil the above referenced well. The permit to re-drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting re-drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 ,&AC 25.035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607. David W. Chairman BY ORDER OF THE COMMISSION dlf/encl c: Dept of Fish & Game, Habitat Section - w/o enct Dept of Environmental Conservation - w/o end STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilli-Illb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] Deepeni-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 12. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. Plan RTE- 71 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612, Anchoraqe, Alaska 99519-6612 ~DL 028330 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 1134' NSL, 760' WEL, SEC. 18, TION, R15E~ Prudhoe Bay Unit At top of productive interval 8. Well number Number 4697'NSL, 4204' WEL, SEC. 17, TION, R15E 12-13B U-630610 At total depth 9. Approximate spud date Amount 5026' NSL, 3234' WEL, SEC. 17, TION, R15E 01/28/96 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 028329 254 feet 12-12, 95 feet 2560 11356'MD/8730'TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth eeoe feet Maximum hole angleeg. 44 o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 29# L-80 Butt 1595' 8646' 7777' 10241' 8710' 335 sx Class 'G' 6" 4-1/2" 12. 6# L-80 Butt 1261' 10091' 8664' 11352' 8724' Uncemented slotted liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~% '"~ ;~;~'~¢' ~L~ Surface Intermediate Production JAN 27- 1996 Liner Perforation depth: measured ~aska0il &O~s Cons. true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirementsl-I 21.1 hereby ~)'fy that t~f~e~tn,,g, is true and correct to the best of my knowledge l/ · Signed -~/'~"~¢'-f,,' ~¢~-';;;'4¢~ Title Senior Drillin~t En~tineer Date/- z Commission Use Only L Number APl number Approval date See cover letter Permic[~ ~ 0/7 50-0,,1,.,~ - ~© (¢[~-0 2_ ,/~¢~' ---,¢'~ for other requirements Conditions of approval Samples required [] Yes []No Mud Icg required []Yes [~No Hydrogen sulfide measures [] Yes [] No Directional survey required ~ Yes [] No Required working pres~,~lii~.l I~d ~2M; I-ISM; [~5M; I--I10M; I--I15M; Other: by order of ~ 5'"'//~ Approved by David W. Johnston Commissioner [ne commission Date Form 10-401 Rev. 12-1-85 licate I Well Name: 112-13B IType of Redrill (producer or injector): Redrill Plan Summary PRODUCER Surface Location: Target Location: Bottom Hole Location: 1134 FSL, 760 FEL sec 18, T10N, R15E x=696830.69, Y=5931445.3 4697 NSL, 4204 WEL, sec 17, T10N, R15E x= 698559, Y=5935056 5026 NSL, 3234 WEL, sec 17, T10N, R15E x=699519, Y=5935410 AFE 4J0311.0 Number: Estimated Start 1/28/95 Date: MD: 111356' IRig: I DOYON RIG #14 Operating days to complete: 20 ITVD: 1 8730' IEEE= 17 .0 I Well Design (conventional, slimhole, etc.): HORIZONTAL SIDETRACK I Objective: I SAG River ABNORMAL PRESSURE Special design considerations NONE. NO ABNORMAL PRESSURE ANTICIPATED. RESERVOIR PRESSURE HIGHLY CONSISTENT IN "DS12" AREA AT 3430 PSI DS12-13B Redrill Plan Summary Page 1 Mud Program: An 10.0-10.2 ppg mud will be used for the 8 1/2" intermediate hole and 9.0 ppg will be used on the 6" production hole. Special design I ikE3qE considerations Depth Densi PV YP INT 10MIN FL OIL SOLID (TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S (PPG) ) min (%) KOP' 10.0 10 15 5 10 5 0 5 to to to to to to to to to 10241 10.1 18 30 15 30 7 0 10 Depth Densi PV YP INT 10MIN FL OIL SOLID (TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S (PPG) ) min (%) 10241 9.0 10 45 5 10 5 0 5 to to to to to to to to to 11352 9.1 15 50 15 30 7 0 10 Directional: J KOP: 188O8 M~ximum Hole Angle: Close Approach Well: 89.44° The above listed wells will be secured during the close approach. Casincl/Tubinq Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tb~l O.D. MD/TVD MD/TVD 8.5" 7" 29.0 L-80 butt 1595 8646/7777 10241/8710 6" 4 1/2" 12.6 L-80 butt 1261 10091/8664 11352/8724 DS12-13B Redrill Plan Summary Page 2 Cement Calculations: Liner 7" 29#, L-80,NSCC Size: Basis: 50% open hole excess, 80' shoe joint, 150' liner lap (9 5/8"), and 200' excess above liner top. Total Cement 70 335sxs of Class G Blend @ 1.17 ft3/sx Volume: Bbls Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. Hazards and Contingencies Mud weights should be kept to a minimum while drilling through the horizontal section (+9.0 ppg) to prevent differential sticking. With 9.0 ppg the hydrostatic is +4195 psi which is well over the formation pressure of +3430 psi. DS12-13B Redrill Plan Summary Page 3 SUM , . 3. 4. 5. 6. . 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. MARY PROCEDURE Pre-Rig Work: NONE well has been temp. aband with retainer and cement squeezed below, cement, plugs and casing has been pressure tested while witnessed. Move in drilling rig. Check well for pressure and flow, rig down dry hole tree and rig up BOPs. Install BOPs and test to 5000 psi. Remove the TWC valve. Circulate diesel freeze protection cap from well and recover for future use. Run in with a 6 3/4" steerable drilling assembly and a 8 1/2" bit with gamma ray/directional MWD. Dress the cement to 5' below the section top. Kickoff displace well to used FLO-PRO system. Continue to directionally drill to the 7" casing point at _+10241' at 83.8° (see attached directional plan). Make a conditioning trip with an 8 1/2" hole-opener for the open hole section Install a used 7", 29#, L-80, BUTT Solid liner with 7" X 9-5/8" packer/hanger. Packer / hanger to be set at _+8646' MD. Cement the liner in place with the total cement volume based upon 50 % open-hole enlargement plus the 80' shoe volume, 9-5/8 X 7" lap volume, and 150' excess on top of the liner with drillpipe in the hole. Re-test BOPs as needed. PU 3 1/2" drill pipe and 4 3/4" steerable drilling assembly with gama ray and directional MWD. RIH and cleanout liner to landing collar, test casing to 3500 psi. Drill out shoe and continue to drill horizontally to 11352' MDTD. Install a 4 1/2",12.6#,L-80,BUTT slotted liner with 4 1/2" X 7" hanger/packer. .The liner hanger is to be at _+10091 '. There exists a possibilty that the liner will be run with two ECP,s as dictated by geology. Run the used 3-1/2" L-80 completion string assembly using as much 3-1/2" used tubing and jewelry as possible. Space out and circulate with corrosion inhibitor. Install a BPV and test plug. Remove BOP's. Install and test the production tree to 5000 psi. Pull tree test plug and BPV. Set packer. Test the tubing x casing annulus to 3500 psi for 30 minutes. Shear RP valve in the upper GLM and freeze protect the well. Set a BPV. Release rig. Complete appropriate documentation and hand-over to Production. DS12-13B Redrill Plan Summary Page 4 ]~PX-ShcPed SePvices D~i[ilng Ai~sk~ Sita±e Plane: Zone~ PBU ' EOA', DS 12 Slot ' t2-13B Wel[poth: 12-13BWp4 7 in IR, Il 83.;~ EI.O1 13/10 331 N 1141 [ 4 I/~. m 113F~ ~.44 71 ~ BIL~ ~ N 8i;'~ E E~L h~get Pdy VERTIDL VIEW SCARE il]0 Ft. / DIVISII)I IVD ~F: ~LLtCAD VERTICPl_ SECTION REP WE]I_LFEAD 24.58 t~ 8753 ~ K-2 TVD MO 11T-~ID VS 4703.10 84.40 ~ 880~ MD ~([P / TIE ~1 / ]IflERfllAI~ PI]INI / START ~ CLg~ @ 7.C~1/iO3 M: 1Vii II~ ['V ~ld X G',ld Y I I I VI'I?IIC~I ~CTII'N PI A~-: 3S(6 ~715 3564 N ~ 3[tgr3 N i~7~ E 6Z~IO ~3'~10 87~ 37~ N CRITIC~_ ~ DA]IR MD lnc A~{. TVD ~ E/V l~se ~ 1105 15B. lB E~185 3 S 3 Il Pe~ml'rost K-~ ~3 ~4.~ 21.~ 7~ ~4~ N i3~E ~ / TIE ~ / ~ 24.40 ~.~ 7~ 2487 N 1~ E ~ / ST~T 7~!~ fit SI~T~ ~ ~ ~t4 ~ ~43N 1SIZE ,~se~Z/L~ ~ ~ 10.42 ~6 ~N 151gE H]tlZI)I[~L VIEW <TRUE ~TH) .qC&E ~ Fi./ DIV1SII)I SURVEY REF: WELLHEAD !/10/96 M5 pm IYSO ;3OO0 2~0 250O ~/50 3O00 WELLINAN FE~ltllLITY STUDY plan b f~ t~,Jblli~, i~am ~1~ {l Im ~ y~, b-n ~rl{lkdl ~' t~.44 8 1 i~a~ M~ ESL I · 3300 ~ 3500 3~0 3~00 3300 3;;03 41300 4100 4L::~) I~0(I 4'~0 4c'J~ 4GO0 4700 ' ..,.' i.! · . Smcy R¢£r~nr.c: WELLHEAD R~l't. tt, nce World Coo~dina~s: Lat, 70.13.01 N - Long, 148,24.44 Re.f~.noe GElD $:ys~ AJa~a S~e Plane Zott¢: Al~ka 4 Rcfereno~ GElD Ooordi~a:os: (fl): $931445.73 N 691~830.69 E NoS Aligned To: TRUE NORTH Vc~ Section E~ft~ce: WELLI~AD Clo~ Rcl'c~nc~: WELLEF~D TVD Rtf~rcnoe: WELUIF. AD Halliburton Energy Services - Drilling Systems PSL Proposal Report Calculated Bring the Minimutn Cunt*tee Method ¥cUical ,~cllon Plane: 35.65 deg. WELLPLA~ FEASIBILITY STUDY I'h1~ plan la for feasibility purposes ~ly It Im not yet been atlifledl Dale: Tknc: W¢ltt~lh ID: Last Revision: 1119/96 Bi~-Si~'~ Servio~ l~illing Alaskm Stale Ha~¢: Zest~ ?RU: EOA: DSI2 Slot: 12-130 W¢ilp,,~lh: 12-130Wl)4 Measured lncl DriP. Subm TVD Cour~ T O T A L GRIDCoo~m~es Clont'e Veti~ Build Walk DLS Cum, Eq~:~.dTold Maxi-lin' M[nEor Dir, V,~ S~vey Tool Depth D[r. Depfl~ Length RocUngulatOff~ Norlhing Eastlag D~. Db'. Seclien Rate Rate Dogleg Rcctaagu]atCoo~ds Enor Enor UaxEn (n) (deg.)(~.) (n) (n) (a) (n) (1~) (n) (~) (n) (dc~.) (fl)(dr, mn) (d~/IOOn) (~t~0~) (~) (ii) (n) {a) (n) (d~.) 030 030 0,00 -74.70 O,0O 0.01} 0.00N 0.OOE593144~.73696830,69 0.001~ 0.00 0,00 030 0.~ 0.OO 03 O.00N 0.00E 0,00 0,00 0.~ 0.OO MWI) 103.70 D,OO 0,00 29,00 103,70 103.70 0.00N 0,00E ~93144L73696130,69 0,00~. o.oo o,oo o.oo o.oe o.oe o.o 0.0ON 0.00~. 2,01 2.01 0.o0 0.07 SPCa-taD 203.70 O.00 0,00 t29,00 203,70 loo.00 0.00N 0.00~. 5931445.73696830,69 0,00~ 0.00 0.00 O. OO 0.OO O.oo 0.0 0.00N 0.00E 2,~9 2,19 0.OO 032 BPCG-I'BD )o~.?o o,0D0,00~.~,003o3.70IOO.oe 0.00~ 0.00~ s93144s.7369~Uo.690.0a~ o.o~ 0.00 0.oo o.oe e.~o 0.0 0.00N 0.0DY. ZS6 2.S6 0.00 0.~7 4e~.70 0,000.00~29,004o3.?0loo.oe o.oo~t 0,00~ s93144s.n~ga~o,~9 0.0~ o.oo 0.00 o. oo o.oo o.~o 0.0 e.oo~ 0.00£ 3,0s 3.0s 0.~0 0.~2 ~0~.70 0,0~0,00eg.00 zo3,70soo.a) o.oo~ 0.00~. s~iqns.~3 e~6130.e~ 0.0~ o.oe 0.00 o. oo o.oo o.oo 0.0 o.oo~ o.oov, z,60 3,~0 0.~0 !.07 ~.70 0,00 0,00 ~9.0~ 603,70 soo. o~ o. oo~t o,ooE s~44~.73 696130.69 o,00g 0.00 0.00 o. oo o.oo o.oo 0.0 e.o~ 0.00~ 4.20 4.~0 0.00 I.~2 '/03.70 D,0[} 0,00 629.00 703.70 I00.0~ 0.00N 0,00B 5931445.73 696130.69 0.013~ 0.0~ 0,00 O. OO 0.0~ 0.00 0.0 O.0~N 0.00~ 4.83 4.S3 0,00 U7 nPCC,-~'aD 803.70 0,OD 0.00 729,00 8~.70 100.0~ 0.00~/ 0,00E 5931445.73 696130,69 0,0l~ 030 0,00 O. OO 0.0~ 030 03 0.04}N 0,00F. 5,47 5.4'/ 0.00 1.82 I~PC~.lq}D ~.70 0.00 0.00e~,oo ~03,70 IOO. oo 0.00~ o.ooE ~93144~.73 6~830.~9 o.oag o.oo 0,00 o. oo o.oo 0.00 ~),0 o.oet~ 0.00~ ti2 6.n 0,00 2,07 ~PC~.~o 1003.70 0,000,00929,001003,70IOO. oo o. ooN o.00E 5931445.73 696130.69 0.00(~ 0.0o 0.00 0.00 0.00 0.00 ~,0 0.00~ 0.00~ 6.79 6.79 0,00 2.32 1103,70 o,oo0,001029.00 Ii03.70I00.~ O. ooN 0,00E 5931445.73696130.69 0.00~ 0.OO 0,00 0.00 0.OO 0.OO 0.0 O.0~t~ 0.O0~ 7,46 7.46 0.00 2,S7 1203.70 0,000,001129,00 1203.70100.00 0.00N 0.00E 5931445.TJ696130.69 0,001~ 0.00 0.00 0,00 0.00 0.00 0.0 0.0e~ 0.00E tl3 8.13 0,00 2,U ePco. eeo ~03.70 0.00 o,oosz~.o~1303.70lO0.00 ~.ooN o.ooE ~3~44s.r~ 69m0.69 0.00~ 0.00 0.00 o.oo o.oo o,oo 0.0 o.oeN o.oo~ a.~l 8.st 0.00 ~,07 1403.'/0 0.00 0,001329.00 1403.70100.OO 0,00N 0.00E 5931445.73 696130,69 0.0ag 0.00 0,00 O. OO 0.OO 0.0O 0.0 0.0ON 0.O0~ 9.49 9.49 0,00 3.r~ i~03.?0 0,00 0.00 14'89.00 iS03.?0100.OO 0.ool, t0.00E 59]144~,73 698]0.69 0.00~ O. OO0.00 O.00 0.00 0.00 0.0 O.00~ 0.001~ 10. S?10.17 0,00 ~.S7 e?cc-.t, eD 1'/03.70 0,75 214311628.99 1703.69IOO,oo 0.985 l.lAg 5931444.'/2 6961293s 1,4~2.9.0S -1,4s 0.2s .24.~7 o,36 0,9 0.gas l,l:~v ll.~ l~.zs 3os.ss 4,0s 1803.70 0,75 229.93 1728.98 1803.68 100,00 1.942 2.0Cig 5931443,74 696U~.74 2,711~225.94 -2,N 0.00 15.12 0.20 I,! 1.94S 2,0~¥ 12.24 12.23 317,94 4,33 19~3.70 0,25 222.06 1828,98 1903.68 100.00 2.52S 2.65W :5931443,14 69612~.11 3,6~{~)22.6.42 .3.s9 .0.~0 .7.87 0.~0 ~.6 ~2s 2,68v 1~9~ 1~92 ~,94 4,s? 20~3.70 0.25 218.18 1928.98 2003.68 100.00 2.858 2.93W 5931442,80696127.84 4,091~225.75 -4,03 O. OO -3.88 0,O2 1.6 2.855 2.9:A¥ 13.62 13.61 315,00 4,82 BI~CG.P~ID 20U.72 0,05 218.18 2010.00 2084.70 81.o2 3,025 3.{RW 5931442.6.3 696827.71 4,3Q~225.38 -4.24 -{).25 -O.00 I),25 I.I 3.0r2S 3.0C~V [4.18 14.17 315.25 :~,03 BPCG-PBD 2103.70 0.00 0.00 2028.98 2103.68 18.98 3,02 S 3.0t'W 5931442,63 696827.'/0 4.31t~,225,37 -4,24 -0.25 0.00 0.25 !.1 3.O2 S 3.0t.~/ 1431 14.31 315.26 5,07 BPCG.I)BD 2203.70 0.00 0.00 2128.98 Z203.68 100.00 3.O2 S 3.0t'W 5931442.63 696827.70 4.31I~225.37 -4.24 03{) 030 O.01) 1.1 3.02 S 3.0cq~/ 15.0(I IS.00 31:L26 5.32 Bt~G.PBD Halliburton Energy Services - Drilling Systems PSL Proposal Report Mcnstucd lnci I:~fl Subsca TVD Cou~ TO T A L GRJD Coordinates Cloture Vc~c.4d Build WaJk DLS C~m. Expected ToIA1 MBX Ho~ M[n Hot Dk, Vcrt D~lh Dk. Depth Length Rcctnnguhu Offsets Nerthing Easling Dist. Dir. $cclion lbtle Reit Dogleg Rccbngular Coords ETmr Error Max l~, Error (fl) (dcg.) (~'ILI (n) (il) (fl) (11) (fl) (ft) (R) (fi.) (deg.) (fi.) (d~/10Ofl) (dg/101~l) (dg/iOOit) (de~ (fi) (fl) (fi) (fi) (deg,) (It) 2303,70 0,00 0.00 2228,98 2303.68 100.Q~ 3.025 3.00/ 593]442,63 b961~27.?0 4.3J~)225.37 -4.24 0.e0 0,00 O.0O 1,8 3.025 3,Oe# 15.69 ~5,69 31526 5.5? 2403.?0 0,00 D.e0 2328.98 2403.68 100.0q) 3.025 3.0~/ 593]442,63 6961127.?0 4.31~22537 -4.24 0.00 0,00 0.00 1,8 .1.025 3.0t~V 16,38 16.38 315.26 5.82 2503.?0 0.00 O,e0 2428.98 250.1~11 100.00 3.025 3.0~V 593],142,~3 r~6827.?0 4.31~225.37 .4,240.00 0.00 0.001,8 3.025 3.0~W17,08 17,08 315~ 6.07 2603.?0 0.25 16J.44 2528.98 260).68 100.O0 ~.2.1~ 2.9~,V 593J442,42696827.78 4.41~222.82 -4,37 0.25 0.00 0.25 21 3,235 2.9'BY 17.77 17.77 308.17 6.32 2703.?0 0,25 167.44 2628.98 2703.68 IO0.OD ~.655 2.811W 5931442,00 696827.91 4.6.~l~2]8.24 -4.64 O.0e 6.00 0,03 2.1 3.655 2.8~ 18,46 18.46 303.96 6.57 BP¢G-I'BD 2803.70 0.25 146.44 2?28.98 2503.6B 1O0.O0 4.05S Z?IW $93144161 696828.09 4.87~213.81 -4,87 0.0~ .21.00 0.09 22 4.055 2.71W 19.16 19.16 299.72 6.82 2903.?0 0,50 1Y7.44 2828.97 2903.67 100.00 4,555 2.2~ 5931441,12 696828.51 5.10~,206.76 -5,03 0.25 .9.0~ 026 2.5 4.55S 2.2r, V 19.85 19.85 28434 ?.07 BPCO. PBD 3003.70 i.00 141).442928.97 3003.&7 100.00 5,54 $ 1.44W 5931440,15 696829.39 5.7'J~194.59 .5.35 0.50 3.00 0.50 3.0 5,54 S 1.44W Z0.$5 20.54 75.55 7.33 BPCO-PBD 3103.70 1.00 128.44 3028.95 3103.65 100.00 6,765 0.2CW 5931438,97696830.66 6,7~181.73 -5.61 0.00 -12.00 0.21 3.2 6,765 0.2(R¥ 2124 21.24 67,30 ?,58 BPCO-PBD 3203.70 !.00 132.44 3128.94 3203.64 100.00 7,895 1.12E 5931437.876%832.02 7.970171,90 -5.76 0,00 4.00 0.1)7 3.2 7.895 1,12E 21.94 21.93 66.25 7.83 B?CG-PBD 3303.70 2,00 53.41 3228.91 3303.61 100.00 7.445 3.17E 5931438.38696834.05 8,090156,93 .4-90 1.00 -79.03 2.~ 5.3 7,445 3,17B 22.64 22.62 306.69 8.ti 3403.70 6.00 47.36 3328,64 3403.34 100,00 2,86S 8.42E 5931443.09696839.18 8,890108.75 2.58 4,00 -6.05 4.02 93 2,865 8,428 23.35 23,20 313,68 8.67 BPO3-PBD Da,~: ~ Wdlpal~ ID: 12-13B, 3503.70 9.00 42.36 3427,78 3502.48 100.00 6.47N 1753E 5931452.65696848.05 18.6~O69.76 15.47 3,00 .S.00 3.07 12,4 6.47N IT.S3B 24.11 23,?.1310.32 9.35 3603.70 12.50 32.36 3526,02 3600.72 100.00 21.39N 28,60E 5931467.86 696858,72 35,770 53.20 34.05 3,50 -lO. Q4} 3.95 163 21,39N 28,60E 2434 24,14 302.55 10.30 3703.70 15.75 32.50 3622,98 3697.68 100.00 41.99N 41.69E 5931488.79 0687127 59,17044.80 58.41 3,25 O. 14 3.25 19.6 41,99N 41,69B 25.90 24.47 302.63 !1.37 3803.70 17.50 35.21 3718,80 3793.50 100.00 65."/2N 57.65E 5931512.93 696886.61) 87,470 41.26 87.00 1.75 2.71 i.91 21.5 65.72N 57.65E 26.99 24,92 304,47 12.15 BPCG-I~BD 3903.?0 l&?5 3:5.50 3813,83 3888..5'3 100.00 91,09N 75.65E 5931538.76696903.94 118,4~39.71 i18.11 1,25 0.29 1.25 22.7 91.09N 75,65E 2821 25,40 304.71 12.83 BPCO. PBD 4003.70 19.~ 33,93 390839 3983,09 190.00 II7.85N 94.19E 5931565.9969692].77 150,117038.63 150.~ 0,50 -I.57 0.71 23.5 117.85N 94.19E 29.55 25.99 303.94 1331 BI~PBD 4103.70 21.00 35.65 4002.28 4076,98 JO0.00 146.09N 113.84E 5931594.7369~940.67 185,21~37,93 185.06 i.75 1.72 1.85 25.3 146.09N 113.04E 31,06 2636 30437 14.20 g~G-PBD 4203.70 23,25 35.46 4094,91 4169.61 190.00 176.73N 135.73E 5931625.93 696961.76 222.84~ 37.52 222.72 2.25 -0.19 2,25 27.6 176.73N 135.T~E 32.?9 26.59 304.79 1530 BPCG-PBD 4303,?0 25.75 36.2{) 4185.90 4260.60 100.09 21034N 160.02E 5931660.16 696985.15 · 26429~ 37.26 264.19 2.50 0.74 2.52 30.1 2J034N 160.02E 34.?8 ' 26.71 30520 16.55 BPCO-PBD f- i- .q 440:].7028.00 35.11 4275.09 4349,79 I00.00 247.08N 18635E 5931697.5? 697010.52 309.4~O37.02 309.39 2.25 -I.09 230 32.4 247.08N 18635E 37,03 2~.81 304.87 17.76 Bi~G-PBD 4503.70 31.25 34,{}64362.01 4436.71 I00.00 287.98N 21438E 5931738.99 6971117,4[ 358.8~ 36.61 358.80 3.25 -I,05 3.29 35.7 287.78N 214.~E 39.61 26.58 304.48 19.40 BPCG-PBD 4603.70 34.50 34.61 4445.98 4520.68 100.00 332.59N 245.01E 59317bl.58 697066.92 413.0~ 36,31 413.06 3.25 0.55 3.26 38.9 332.59N 245.01E 42.72 2~.22 304.64 21.08 BPCO-PBD 4703.70 34.75 36.00 452827 4602.97 100.00 378.96N 277.84E 5931831.79 697098,53 469.9~ 36.7.5 469.87 0.25 139 0.83 39.11 371196N 277.M~ 45.93 26,74 305.10 21.6~J BPC. G-PBD :~ 0 4g03,70 35.00 37J96 461032 4685.02 100.00 424.72N 312.12E 5931878.43 697131.60 527.07~ 3631 527.04 0.23 1.66 0.98 40.7 424.72N 312.12E: 4921 2726 305.66 22.18 BPC~PBD 4903.70 35.00 38.38 4692.2.3 4766.93 I00.00 ,169.91N 347.45E 5931924.52 697165.73 584.4ZO 36.48 584,34 0.00 0.72 0,41 412 469.91N 347.45£ 52.72 27.85 305.99 22,6t BPCG-PBD 5003.70 35.25 39?5 4774.02 4848.72 100.00 514.57N 383.?1E 5931970,12 697204}.81 641.89",~ 36.71 641.77 O~ 137 0.83 42.0 ~14.57N 383.71E 56.25 28..37306.48 2320 BPCG-PBD 5103.70 36.7~ 39.13 4854.92 492~.~2 100.00 559.97N 421.04E 5932016,47 697236.95 700.60~ 36.94 ~00,42 1.50 -0,62 1.54 43.5 559~7N 421.M15 60.04 28.42 306.59 2429 B~D 5203.70 40.00 34.51 493332 5008.02 I00.00 609.68N 458.15E 5932067.13 697272.74 762.64~ 36.92 762,45 3.25 4.62 433 47.9 609.68N 458,15E 64.30 27.?5 305.74 26.15 BPCG-~D 5303.70 4J.75 31.18 5008.9~ 5083.65 100.00 6&I.66N 493.60E :5932123.02 697306.74 827.90~ 36.~ ~?.79 1.75 -333 2.~ 50.7 ~.~N 493.~E ~ ~. ~91 2739 B~D 5403,70 4Z0O 3135 5083.41 5158.11 l~.00 ~i,66N 52~4E ~932180.90 69U39.98 ~ 3621 894.35 O~ 0.37 03S 51.0 ~I,~N 52834E 73.~ ~.08' ~,75 28.01 B~D 55~,70 42.00 29.?6 5157.72 ~ 1~.~ ?79,~N ~E 5932~9.32 ~73~58 961.01~ 3~.~ ~1.00 0.00 -1.79 I~ 522 ?~.~N S~46E 7&16 ~.67 ~.~ 28.53 BP~PBD 5©3,70 42.(?0 25.~$ 5232,05 5306.75 100.00 ~8.48N 593.45E 5932299,38 697402.00 102725:~ 35.29 1027.23 0.e0 -4.31 2.88 55.1 838.48N 593,45E 82.80 29311 30324 29.04 BI~OG-PBD 5703.70 41.00 26.9a 5306,95 5381.65 100.00 ~97,93N 622,71 E 5932359.56 697429.70 1092.72~ 34.74 1092.58 -i.00 1.53 1.42 56.5 897.93N 62231 E 87A5 30.28- 303.09 29.10 BPCF~-PBD 5803.70 4LO0 26.80 5382.42 5457.12 I00,00 956,44N 652.38E 5932418,83 697457.83 1157.7:~3430 !157,43 0.00 .0.18 0.12 56.6 956.44N 652.388 92.09 ~0.M 302.75 29,61 BPCE-i'BD 5903.70 41.00 26.23 5457.89 5532.59 100.00 1015.15N 681.67E 5932478,28697485.57 1222.78~ 33.88 1222,20 0.00 -0.57 0.37 57.0 1015.15N 681.67E 96.75 31.42 30239 30.12 BPO3.PBD 6003.70 41.00 28.88 553337 5601107 I00,00 1073.30N 712,01E 5932537.2069751438 1287.99~33.56 1287.14 O.00 2.65 1.74 58.7 1073,30N 712.OlE 101.49 31.89 302.43 30.63 BPCG-PBD 6103.70 40.75 28.58 5608.98 5683.68 100,00 1130,68N 743.47E 593259539697544.32 1353.21@3333 1352.10 47.25 -0.30 0.32 59.1 1130.68N 743.47E 10&iT 3237 302.24 31.02 BPCG-PBD Halliburton Energ~ Services - Drilling Systems PS~L Proposal Report M~w~ lnel l)fiP. Sub~.a '13/O Courg TOTAL 61UDCoordinatcs Clon~'~ Vcrflca~ Bttlld Walk I~pth Dk Deplh L~glh Rect~gu]atOffscts Northlng Ensfing Dist, I~r. gecllon Rae IL~ Dogleg Rr.t~mgularCeor~ Error Enor MagEn' Error (~) (~q~.) (~¢~) (n) (ti) {ii) (n) (ii) in) (ti) (n) {~.) (ti) (dr/100n) (dr/le0,) (dr/t00n) (~ (f~) (~) Wellpalh ID: 12-13b, S~ Tool 6203.71 40,00 28.61 5685.16 5759,86 I{N).0011~756N 774.47E 5932653,05 697573.83 1417,71~$311 141639 ..0.75 0,03 0,75 59,8 1187.56N 774.47E 110.76 33.49 302.10 31.15 BPCG.PBD 6303.70 41,00 28.18 5761,20 $83~.90 100.00 1244.69N 805,~E $932710,97 697603.20 1482.52~2.~0 1410.82 1,00 -0.43 1.04 60,9 1244,69N ~0535E 115.51 33.60 :301.90 32.17 BPCG.PBD ~03,?1 40,00 28,28 5837.24 5911.94 i{)0.001301,91N 836.07£ 593276S,97 697632,41 1547.2~ ~71 1545.22 -1.00 0,10 1.00 61,9 1301.91N 836.07E 120.13 34,65 301.77 32.16 BPCG-PBD 6503.70 40,00 2731 5913.85 $985.$5 10D.00 1358,'/7N R66,04E 5932826,59697660.~8 1611,30~32.51 1608.89 0.~ 4}.97 0.62 62.5 1358,77N 866.04E 124.75 35.25 301.55 32.66 BPCG-PI~D 6603.7~ 40,00 27.16 5990A$ 6065.15 100.00 1415.93N $95.46E 5932884,49697688.79 16753:~Y/.31 1672.48 0.00 43.15 0,10 62,6 1415,93N 895.46E 129.38 35,82 301.38 33.17 67{B.20 40,00 27.01 6067.{)6614136 100.00 147'J.15N 924.73E 5932942,47697716.$5 1739,34~12 1736,04 0.~ 43.15 0.10 62,7 1473,15N 924.73E 134,01 36,40 301.22 33.61t BPCG-PBD 6803.70 38.75 26.20 6144,36 6219.06 100.00 152~.87N 953.14E 5932999,91 697743,47 i102.4~31.92 !~98.69 -!.25 43.81 135 64,0 1529,87N 953.14E 138.47 37,6~ 301.03 33,49 BPCO-PBO 6903.E 3g.O0 26.21 6222.7S 6297.45 100.O0 15~.f/N 980.56B 5933056,30 697769,41 1864.2~31.73 1859.93 -0.75 : 0.01 0.75 64.8 1585.57N 980,56E 142.1L1 38,59 300,89 )3,55 BPCO-I'BD 7003.~ 37.75 26.20 6301,69 6376.39 100.00 1640.66N 1007.67E 5933112.07697795.07 1925,3~3136 1920,49 .0,25 -0.01 0.25 65,0 1640,66N 1007,67E 147,16 39.30 300,75 :~3,90 BPCO-fBD 7103.~ 36.75 26.13 6381.29 6455.99 100.00 1694.98N 103436B 59~3167.0869732032 1985.6~31.39 1980.19 -I,00 -0.07 !.00 f~.0 1694.98N 103436E 151.36 40.40 300,63 33,99 BPCCr-PBD 7203.70 36.75 25.13 6461,41 6536.11 100.00 1748.93N 1060.24E 5933221.68697M4.78 20452~3123 2039,11 0.00 -I.0O 0.60 66.6 1748.93N 1060.24E 155..~1 41.02 300.44 34.2[ BPCO-PBD 7303,?~ 36.00 25.00 6541,93 6616.63 100,00 1102.65N 10115.36E 5933276.04697868.49 2104.17@31~5 2097,41 -0.75 -0,13 0.75 67.4 1102.65N 108536E 159.64 42,00 300.30 34.30 ltPCCr-FBD 7403,7C,35.{X) 24.21 6623.34 6698.04 100.00 1855.44N 1109.55E 5933329A4 697891.7.8 2161.11.e/~ ~.~ 2154,40 -I,00 -0,79 1.10 68.5 1855.44N 1109.55E 163,$9 43.13 300,13 34.14 BPOO-PBD ti .~ 'r 7503,7~,34.50 23.21 670530 6780.20 100.00 1907.63N 1132.47E ~9333~2.21 697912.82 2218A.~ ~,'/0 2210.17 -0,$0 -1.00 0.76 69.2 190'/.63N 1132.47E 167.47 44.02 299.94 3429 BPCO-PBD I~ ~ 1- 7603,7:,33.75 21.33 6788.29 6162.99 100.00 1959.53N II53.73E 5933434.65697932.72 2273.9f~.49 2264.74 -0.75 -1.88 i.29 70.5 1959.53N 1153.73E 171.23 45.08 299.70 34.27 BPCG-PBD g.~ I- a 7703,7~ 32.00 22.20 687Z27 6946.97 10e.00 2009.94N II73J, SE ~933485.57697951.51 2327.62~3~.29 2317.43 -1,75 0,87 I.$1 72.3 2009.94N 1173RSE 174.81 45.50 299.59 33.57 BIEG-PBD 78)3,*~ 31.75 23,70 6957.19 7031.89 10~.00 205837N 1194,44E $933534.72697970.81 2380.{g~ 3~,I2 2368.94 -0,25 130 0.83 73.2 2058.57N 1194.44E 17837 47.19 299.:~I 33.84 BfC{3-PBD 7903,7~ 30,00 26.41 7043.02 7117.72 t00.00 2105.06N 1216.14E 59335~1.76697991.211 2431.10~ ~02 241937 -1,75 2.71 2,23 75,4 2105,06N 1216.14E 181.74 48,59 299.53 33.09 BPCG-PBD ,~ ~,~ '7 8103.'t'0 29.00 24.11 7217.31 7292.01 1O0.0e 2194,05N 1257,39E 5933671,80698030.19 2528,110 29 ~ 2515.73 4},25 4}25 0,28 76.9 2194,05N 125739E 1118.19 $0.37 299.30 33.24 B~G,.PBD ~ rC. 8203.~ 28,50 24.86 7304.98 7379.6[ 100.0~ 2237,11N 127735E 5933716,06691049.00 257631029.72 2%2,92 4}.50 0.68 {),60 77,5 2237.81N 127735E 191.36 $1.23 299.25 3330 BPCO-PBD r~03.?0 2~.00 23.71 739~.O7 74&7.77 I00.00 ~280.95N 1296.a2E 59~37S9.7069~06~.~3 2623.1~ 29~2 2~9-33 .0.50 -1.15 0.74 78.3 2~0.95N 1296.12E 19,1.,15 52.12 299.~4 33.35 BPCO-PBD Z403.?0 27.25 22.~3 7481.67 7556.37 100.O0 2323.51N 1315.07E 5933802.786980~4.45 2669.91~ 293! 2654.60 ~.75 -I.0d 0.90 79.2 2323.58N 1315.07E 197.45 53.14 299.02 33.21 BPCO-PBD 3503.70 2'/.00 22.35 7570.67 7645.37 100.00 2365.70N 1332.$1E 59~3345.35698[00.78 2715.1~ 2939 2699.00 .0.25 43.28 0.25 79.4 2365.70N 133251£ 20D.43 53.9{)298.92 33.43 BPCG-PBD g6CU.?0 26.00 24.08 7660,16 7734.86 100,00 240631N 1350.09E 5933886.80 698117,27 2759,$3{~ 2~.29 2742.56 .l.0~ 1.73 8703.?0 23.25 21.73 775033 7825.03 [00,00 2446.53N 1366.93E 5933927,06 698133.06 2802,$0~ 2~,19 2714.74 ~.7~ -2.35 K-2 g752.% 24.58 21.80 7795,00 7869.70 49.2:$ 2465.80N 1374.62E 5933946,52698140.24 2823.0~2~.14 28~4,88 -136 0.14 126 80.7 2406.71N 1350.09E 203.31 54.96 298,19 33,09 BPOO-PBD 1,26 82.0 2446.53N 1366,93E 206,07 $6.00 298,76 32.92 BPI~?.~BD 136 112.6 2465.73N 1374,80E ~6.36 ~6.43 298,75 32,52 BPI-I~-PBD I~01.~ 23.92 21.87 7M9.35 7914.05 48,64 24M-35N 1352.05E 5933965.25 698147.19 2842.90~ 2~.,.~2824.28 -I.36 0.1~ 136 833 24M.21N 1382.40E 206.6:$ 56.86 298.75 32.14 BPI-~-PBD 1807.~ 2,4.46 21,87 7M4.82 7919.52 6,00 2416.63N 1382.9715593Y967.56698148.04 2845.34~ 2'9.~ 2826,67 9,00 0,0O 9.00 83.8 2486.48N 138334E Z~6.69 56.65 298.75 32.55 BPHM-PBD KOP / TIE IN / uq'rERPOLATED PO]NY ! START OF CURVE ~ 7.00 dog/100 fl 1808.~ 24.40 22,06 7845.74 7920.44 1.00 2417.02N 1383.[2E 5933967.95 698148,19 2845.7.~ ~8 2~27,07 -5,95 18,61 9.73 83.9 2486.87N 1383.50E 206.70 56.68 298.75 32.M 8908.~ 31.03 17.19 7934.22 8001,92 I00,00 2Y30.MN 1398.Y2E 5934012.15698162A2 2891.54~2~...'r22171.66 6,63 -4,86 7.00 90.9 2~30.$$N 139935B 20735 54.12 298.54 37.71 BPHM-i~BD 9008.~ 37.78 13,92 8016.69 8091,39 100.00 2515.26N 1413.52E $934066.95698176.00 2946A6~2~..,c'/ 2924,63 6.7:5 -3.28 7.00 97.9 2SM,MN 1414.89E 2~.09 51.05 29826 43.01 B?HM-iq~ 9108,6C 44.60 !1.~1 8091,90 816&,60 100.(302649.48N 1427.92E 5934131.52 6911188.70 3009.T/~32 2985,20' 6,82 -2,40 7.00 104.9 2648,94N 1429.87E 208.92 47.59 297.94 48.13 9PltM4~BD 9208,~.' $t.46 9,63 8158.73 8233,43 10~}.(}0 2722.$3N 1441,48E 5934204.90698204}35 3080.59"~ 2'?903052.47 6,86 -1,88 7,00 111.9 2721.88N 1444.05E 209.115 43,88 297.59 52,19 ~itM-PBD END OF 9304.2.~ 58.05 8,14 8213.91 8281,61 95.66 2799.68N 1453,50E 5934282.33698210.34 3154.5C~27.~4 3122.16 6,88 -I,56 7,0D !18.6 2798.95N 1456.66E 210.112 40,28 297.23 56,97 BPHM-PBD ~ART OP CURV~ @ 14.00 dog/100 9832A9 51.05 8.14 t493.46 [5611.16 ~28.23 ~243.36N 1~i6,94£ $9~472730 698262.13 3581)3~ 2~07 3519.611 0.(}0 0,00 0,00 i18,6 3242.16~ 1523.36E Z17.81 42.36 296.$1 59,00 BPHM-PBD Measured ln¢l Drift Subsea TV]) (:anne TOTAL ~ X~f, I)~p~h lx:ng~ RecOmgulm-O~els Ba~c HRZ/LCU Halliburton Energy Services - Drilling Systems PSL Proposal Report GRID Coordinal~$ Closure Vertical Build Walk DLS Cum. F_.xpccted TotalMa0tHor MinHor Dir. V~ No~ing Easling Dist. D~r. goction Rate ~ Dogleg Rcct~gulaCoordl Enur P. nof Max~n Error (n) (n) . (n) (d~.) (n) (~ioofl) (d~yl0oa) (dryio0~) (~cs) (t~) (~) (n) (t~) (d~g,)(~) Wcllp~IO: 12-13~ Sun, cT Tool 9846.84 5837 10,42.8501,00 8575.70 1435 325~AIN 1511.91E 5934739.6069826338 359232~25,01 :~530.62 3.65 15.89 14,00 120.6 3~4,19N 1525.~E 218.16 41,29 296,60 59.33 BP~I-PBD 9~2,49 62.48 23.45 8543,27 8617.97 85,~ 3326,45N 15~.71E 5934811.196982~.71 3~5,9~24.85 ~6~1.~ 4,56 15~2 14,0~ 132,6 3324.58N 1548.7SE 2~.~ ~5,62 297.30 61,6~ BP~-PBD ~/~ 9984,17 65.~ 30,~ 8566,00 8~0.70 51.67 3367.70N 1561.90E 59~85Z91698~.80 37122~.88 3~6,~ 5,65 14.~ 14,0~ D9,9 3365,14N 1571.08E 220.93 33,33 297.80 63.16 BP~-PBD 10032,49 68.44 37,3~) 8584,96 8659.66 48.33 3~4,46N 1586.83B 5934890..18698327.76 3756.11~ 24.99 3691,33 6,29 13.60 14,00 146,6 34~0.97N 1597.24E 221,60 3232 298.29 64.59 B?HM-PBD ]0132.49 75.46 50,15 8616,04 8690,74 100.00 3472,76N 1652.556 5934960J8 698391.65 .1845.91~.45 3785,13 7,02 12,75 14.00 160.6 3465.89N 1665,78E 222.50 34.18 299.37 67.29 10232.49 83.12 62.0~ 8634,67 870937 100.00 352730N 17~.97E 5935017.03 698471.59 3930,4:~26.[8 3876,90 7,66 11.93 14.00 174.6 3515.72N 1749,69~ 222,~ 40.~2 30034 69.26 BPHM-PBD TepSag 10235.27 83..14 62.41} 8635,4}0 8709,71} 2.78 3528.58N {736ALE 5935018.38 698473,99 3932.68~26.20 387~.36 7.87 11,66 14.00 17~.0 3516.88N 1752.20E 222,84 40.73 300.36 69.30 BPHM-PBD CASING POiiff OD =7~n, 1D--6.28 in, WcigM - 26.00 lb/Ii. 10241.00 83.79 63.137 1635.64 8710,34 5,7.1 3531.19N 1741A7E 5935021,12 69M78,99 3937.26~26.25 3884.44 7.88 11.65 14.00 175.8 3~31.19N 1741A7E 0.00 0,00 0.~0 0.00 BPHM-?BD 10312.03 89A4 71.27 1639.84 8714.54 71.03 3558.65N 1806.75E 5935050.29698543.$0 3991.03~ 26,92 3944.79 7.95 11,55 14.00 IIt$.~3542.74N 1823.96E 222.85 47.21)~0,9~ 70.05 aPl~l.rBo CASING POINT OD .=41/2 i~, ID = 3.95 i$ Wcighl.. 12,60 lb/fl. 11352.~ 89.44 71,27 ~650.00 8724.70 1039,97 3892.51N 2791.62E 5935409,99699511,98 4790.07~35.65 4790.07 0.00 0.00 0,00 185,1 3892.$1N 2791.62E 0.00 0,00 0.01) 0.00 BPHM-PBD ESL 11:t52.03 89.44 71,27 8650.00 8724.70 I}.03 3892.52N 2791.64E 5935410.00699519,00 4790.10~35,65 4790.10 O.00 0.03 0.03 185.1 3819,64N 2828.171~ 248.85 61.43 307.10 76.07 BPEM-PBD WEI..LP~ I::EASII31LITY 3TUI~Y ~ plml h 'for f~mrb]lfly purlin ~ ~ n~ yet I~en 13-3/8" 72 #/ft L-80 BTC 8796' 8841' DATE 1/2~95 Production Tubing 3-1/2" 12.7#/ft L-80 NSCT · NO MD TVD(RKB) 1 2 3 4 5 6 7" X 9-5/8" Hanger/Packer 8646' JAN 22 ]¢,.,,¢ Sidetrack KOP @ :t:8808 'md 4-1/2" Slotted Liner Running Order /~r~ch¢:~r~(: Note: Run TIW SS Packer (6') Blank joint of liner (40') 2' CTC Profile Sub (2') (** may not be needed) Ported Nipple Joint (40') 1 Slotted Joint to csg shoe (40') Slotted Liner to TD Set liner top @ _+ 150' from 7" casing shoe 4-1/2" x 7" Packer Set @ :b 9304' (WLEG at L T 60°) 7" 26 #/ft L-80 BUTT MOD Liner Set @ + 10,241 ' md at 83.8.° inclination 4-1/2" 12.6#/ft L-80 BUTT (Slotted) 9-5/8" 47 #/ft L-80 BTRS ~TD@ 11352' MD CTC ECP Assembly (2 are planned) Setting Depth TBD @ TD REV. BY BWS COMMENTS PROPOSED SIDETRACK COMPLETION PRUDHOE BAY UNIT WELL: 12-13B APl NO' 50-029-20614-00 SEC 18; T10N; R15E ARCO Alaska CHECKLIST GEOL AREA PROGRAM:, exp [] der /1%?o ADMINISTRATION !. Permit fee attached .................. .~ N 2. Lease number appropriate ................ ~ N 3. Unique well name and number ............... 4. Well located in a defined pool ............. ~ N 5. Well located proper distance from drlg unit boundary. . ~ N 6. Well located proper distance from other wells ...... ~ N 7. Sufficient acreage available in drilling unit ...... ~Y~ N 8. If deviated, is wellbore plat included ......... ~- N 9. Operator only affected party .............. ~ N 10. Operator has appropriate bond in force ......... .~N 11. Permit can be issued without conservation order ..... ~ N 12. Permit can be issued without administrative approval.. ~ N 13. Can permit be approved before 15-day wait ........ ~ N REMAP~S ENGINEERING 14. Conductor string provided ................ 15. Surface casing protects all known USDWs ......... 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ....... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............ 21. If a re-drill, has a 10-403 for abndnmnt been approved.~ 22. Ade~ate wellbore separation proposed .......... 23. If diverter required, is it ade~ate .......... list 24. Drilling fluid program schematic& equip adequate 25. BOPEsadequate ..................... 26. BOPE press rating adequate; test to ~ psig.~7 27. Choke ~nifold complies w/~I ~-53 (May 84) ...... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............ GEOLOGY DATE 30. Permit can be issued w/o hydrogen sulfide m~N 31. Data presented on potential ~es . .... ~ N 32. Seismic analysis ~s zones. ......... ~ N 33. Se~~ (if off-shore) ........ ~ N 34. C name/phone for weekly progress reports ..... Y N / [exploratory only] W/ljb - GEOLOGY: ENGINEERING: A:1~-ORMSAcheldist rev 11/95 COMMISSION: DWJ JDN TAB Comments/Instructions: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY I/NIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 6662.00 TOM McGUIRE GENE COOPER D.S. 12-13B 500292061402 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 26 - APR- 96 MWD RUN 2 TOM McGUIRE GENE COOPER HWD RUN 4 TOM McGUIRE GENE COOPER JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 TOM McGUIRE GENE COOPER MWD RUN 6 TOM McGUIRE GENE COOPER MWD RUN 8 BUD JAHN GENE COOPER MWD RUN 9 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROI/ND LEVEL: BUD JAHN GENE COOPER WELL CASING RECORD 18 10N 15E 1134 760 76.02 74.52 40.90 OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.375 2671.0 9.625 8404.0 8.500 7.000 10477.0 6.000 4.500 11683.0 MWD - NGP. ALL DEPTHS ARE MEASURED BIT DEPTHS. ROTARY TABLE IS THE CONTROL ELEVATION AT 74.52'. MWD RI/NS 1, 2, 5, 6, 8, & 9 WERE DIRECTIONAL & NATURAL GAMMA PROBE (NGP) UTILIZING SCINTILLATION DETECTOR. MWD RUN 4 WAS DIRECTIONAL ONLY. NO DATA IS PRESENTED. LOGGED GAMMA RAY (NGP) THROUGH CASING FROM 8734' TO 8800' MD'. THE WELL D.S. 12-13B PB1 WAS DRILLED DURING RUNS 1, 2, & 3. THE WELL D.S. 12-13B PB2 WAS KICKED OFF IN THE INTERVAL DRILLED DURING RUN 2 & SO ENCOMPASSk_ RUNS 1, 2, 4, 5, 6, & 7. THIS WELL, D.S. 12-13B, WAS KICKED OFF IN THE INTERVAL DRILLED DURING RUN 6 & SO ENCOMPASSES RUNS 1, 2, 4, 5, 6, 8, & 9. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 8734.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: STOP DEPTH 11639.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 8810.0 9034.0 2 9034.0 9313.0 4 9313.0 9374.0 5 9374.0 10353.0 6 10353.0 10477.0 8 10477.0 11091.0 9 11091.0 11683.0 MERGED MAIN PASS. NO GR DATA WAS RECORDED DURING MWD RUN 4. THIS INTERVAL WAS LOGGED AS PART OF MWD RUN 5. CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 12-13B : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 71 Tape File Start Depth = 11685.000000 Tape File End Depth = 8732.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17722 datums Tape Subfile: 2 179 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SIZvRVLARY VENDOR TOOL CODE START DEPTH GR 8734.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8956.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRC~TING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 1. 01-FEB-96 1.32 2.04 MEMORY 9034.0 8810.0 9034.0 0 23.9 33.0 TOOL NUMBER NGP 184 8.500 8404.0 KCL POLYMER 9.60 42.0 11.9 22000 .0 .000 .000 .000 .000 .0 112.1 .0 .0 .00 .000 .0 0 CN WN FN COLIN STAT : ARCO ALASKA, INC. : D.S. 12-13B : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 8 Tape File Start Depth = 9040.000000 Tape File End Depth = 8732.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1852 datums Tape Subfile: 3 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8937.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9758.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 2. 02-FEB-96 1.32 2.04 MEMORY 9800.0 9034.0 9800.0 0 33.9 61.2 TOOL NUMBER NGP 136 8.500 8404.0 KCL POLYMER 9.80 57.0 8.4 43000 .0 .000 .000 .000 .000 .0 141.6 .0 .0 .00 .000 .0 0 CN WN FN COUN ST~T : ARCO ALASKA, INC. : D.S. 12-13B : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 21 Tape File Start Depth = 9805.000000 Tape File End Depth = 8930.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 22976 datums Tape Subfile: 4 84 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes 0 0' 000 ' 00' O' 000' O' 000' ~'~ST 000' O' 000' 9'6 0SE££ S'8 0'S9 0E'0I X%OaI~/Lq~fg/XIM O' ~70 ~78 00S'8 9£I dDN 0 0'£S£0T 0'5L£6 0'£S£0I 50'~ ~£'I 96-~Z~-0I ' S lxLrlE CIMi4 : SMR-~fMZ%t : (ZH) XDNZfl~)Z%{,~ : (MI) ,~,~OGNtf£S ~O0,1, :(MI) NOILDZ~OD Z~OH :XLISNZ~ XI~L~ :XIEL~ : (NI) ZZIS LIE Z~IOH NZdO ~fi~f~ ~NIS~fD ~ ZqOHZ%tO~ ZdXJ. ~IO0,L ZGOD ~IOOJ, %tO~NZA (~40,1,iO~ OJ~ dOi) D~II%tLS qOO,L 0'68EOI SIq :~clA~ sy S sI!~qns sd~i CN WN FN COUN STAT MWD RUN 4 WAS DIRECTIONAL ONLY. NO DL .~ IS PRESENTED. $ : ARCO ALASKA, INC. : D.S. 12-13B : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 26 Tape File Start Depth = 10360.000000 Tape File End Depth = 9280.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8336 datums Tape Subfile: 5 90 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 0 0' 000 ' 00' O' 000' O' 000' 9'9ST 000' O' 000' 9'6 0fi~££ O'fi9 OZ'OI 0'9058 00S'8 0'6/. ~" fi/. 0 O'LL5OI 0'£fi£0I O'LLSOI ~EON~N 50'~ EC'I : (ZH) XDN.qQ~),~H.4 : (NI) ,4.40CLN~J,$ %00J, :(MI) NOILDZMMOD Z~OH :AilSNZ~ XIMLtfM :XIML~ ~O0i NOMJJ1ZM : (LM) HidZ~ DNIS~D S,MZq~IMQ :(MI) ZZIS LIS Z~OH ~ ONIS~D ~Nlf Z~OHZMOM ZdX,l, ~IOOJ, Z(/OD ~IO0,1. ~OQNZA (NOLLO~ 03, dOi) ©NI%ILS ~IO0,1, 0'EI~0I GMN Mill{ %{ZCBfZH Z~II,~ SIq :~clK~ sT 9 aIT~qns ~dei CN WN FN COUN STAT ARCO ALASKA, INC. D.S. 12-13B PRUDHOE BAY NORTH SLOPE ALASKA FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10480.000000 Tape File End Depth = 10280.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24180 datums Tape Subfile: 6 68 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10210.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11048.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MI/D CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 8. 18-FEB-96 1.32 2.04 MEMORY 11091.0 10477.0 11091.0 0 82.7 95.9 TOOL NUMBER NGP 184 6.000 10477.0 FLOPRO 9.20 62.0 10.0 43000 6.0 .000 .000 .000 .000 .0 145.9 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 12-13B : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ TIP Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 22 Tape File Start Depth = 11100.000000 Tape File End Depth = 10200.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13740 datums Tape Subfile: 7 85 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes O, O' 6'SPI O' 0 O' 000 ' 00' 000 ' 000 ' 000 ' 000 ' O00£P O'Cj/. 0£'6 O'HdO'-i,~' O'LLPOT 000'9 L'E6 P'06 0 0'£89II 0'I60II 0'£89II XMONMN P0'E 96-~Zd-6I :(ZH) XON.wnb.w~.~ : (MI) .~,~0GknfiS : (NT) NOZ,T,OZ%t~OD : XLISNZ~ : XI%tL~ ~IO0,T, NO%ILflZN : (i,~) H,T, dZfI DNIS~fO S : (MI) ZZIS ,T,I~ Z~IOH NZdO ~fi~ffI ~NIS%fO ~IN%f ZdX,T, ~IO0,T, Z(IOD ~IO0,T, (NOLLO~t O,T, 40J,) OMI%tLS ~IO0,T, 0'6£9II HLdZ~ dOiS SIq :~clXq sT 8 sIT~qns ss~Xq ~IOI :q~Bu~I p~oDs~ mnmsx~ ss~Xq E9 :q~Bu@I p~oD~ mnmsuT~ '''Sp~OD~I 6L 8 :sIT~qns sd~i smn~p ~08~ 89 :~poD :A~mmns 6u~poo~p ~po~ uo~u~s~d~ SI~ 00000S'0 = 6u~s~ds IS~S~ ~I7~ sd~i 000000'~0II = qqd~G pu~ ~I~ 000000'~89II = qqd~ q~qS ~I~ 9I :sp~oos~ ~qe~ ImqOi ~ SZLX~ ~IOI (0 ~ZdXi) ~ODZ~ ~i~ ~ I0 018 06 5 I0 0I£ 06 ~ P MHdg I 89 GMP~ dOE E P Id~%f I 89 ChM~ ~ I pon sID clKL clKi qq6u~ SZTS sqIu~ s@Idm~S spoo IOO£ ~mPN ~ :GI qqd~p ~M S~I~f : ZdO~lS H,T,%tON : X~f8 ,qOHg~l%td : ~£I-EI 'S'Q : · OMI '%[MSk~f ODh~f : NflOD N~ NM MD Tape Subfile 9 is type: LIS 96/ 4/26 O1 **** REEL TRAILER **** 96/ 4/26 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 26 APR 96 9:14a Elapsed execution time = 1.59 seconds. SYSTEM RETURN CODE = 0 oubfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 1 6663.00 TOM McGUIRE GENE COOPER D.S. 12-13B PB1 500292061470 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 26-APR-96 MWD RUN 2 TOM McGUIRE GENE COOPER 18 I0N 15E MWD RUN 3 TOM McGUIRE GENE COOPER 1134 760 76.02 74.52 40.90 OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 13.375 2671.0 9.625 8404.0 7.000 10419.0 MWD - NGP. ALL DEPTHS ARE MEASURED BIT DEPTHS. ROTARY TABLE IS THE CONTROL ELEVATION AT 74.52'. MWD RUNS 1, 2, & 3 WERE DIRECTIONAL & NATURAL GAMMA PROBE (NGP) UTILIZING SCINTILLATION DETECTOR. LOGGED GAMMA RAY (NGP) THROUGH CASING FROM 8734' TO 8800' MD. THIS WELL, D.S. 12-13B PB1, WAS DRILLED DURING RUNS 1, 2, & 3. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. 000000'~£L8 = 000000'0g~0T = I0 018 06 ~ I0 0I£ 06 ~ 89 QMI4 dOg E s2!u~ s~Idme$ ~poo TOO& sm~N :s~no E d :Gl qqd~p sd~i (~9 #~dX&) ~OD~H i%/UgSOd ~ HdO~IS HJ.gON : X~f~t HOHC[flgd : l~4 ~£I-gI 'S'CI : ' OMI '~MS~iV OD~f : NnOD NM ND 0'6l~0l 0'0086 0'0086 0'5£06 0'5£06 0'0188 I HSVS H©gHN dOi H~gHN ON N/lg lis HidH~ G~IdlHSND IN~i%fAIfl~H H&dH~ dOiS CIMN .~GOD ~IO0,T. fled ,wDgDos %f.T,~f(I (Z,~Dg,~N H,T,d,~Q ,~NI~I~S~f~ :SIdlHS gOd ~AgDD 0'~£L8 H&d~ ~g%f&S HGOD ~00~ O00S' :iN~N~gDNI · p~B~sm sun~ qTq II~ !s~Axnm p~ddTlm pu~ psq~!qs qqd~G , . g~(/%f~H ~U~ ~ape File Level Spacing = 0.500000 Tape File Depth Uhits = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10132 datums Tape Subfile: 2 126 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes .~pe Subfile 3 is 'type° LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8734.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8956.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTP~ATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 1. 01-FEB-96 1.32 2.04 MEMORY 9034.0 8810.0 9034.0 0 23.9 33.0 TOOL NI3MBER NGP 184 8.500 8404.0 KCL POLYMER 9.60 42.0 11.9 22000 .0 .000 .000 .000 .000 .0 112.1 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 12-13B PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 8 Tape File Start Depth = 9040.000000 Tape File End Depth = 8732.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1852 datums Tape Subfile: 3 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes . O' 9'I~I O' 0 O' 000 ' 00' 000 ' 000 ' 000 ' 000 ' . 000£5 5'8 O'LS 08'6 0 ' 5058 9£I dDN E'I9 6'££ 0 0'0086 0'5£06 0'0086 ~O'E E£'I : (ZH) XDNZflD,~%{,~ %{M,q : (NI) ~OGNtf,I,S %003, : (NI) NOIID~E~OD ~qOH :XLISN~ XI~Lk~4 :XI~LIfM qOOi NO~J~flZN : (i.~) HLdZ~ DNIS~fD S : (NI) ZZIS iI~ ZSOH NZdO lfi%fG DNISIfD GN-~ Z~IOHZ%/O~ ZdX,l, ~IO0,1, ,~GOD ~IO0.1, %tOCL~ZA (MOiiO~ O,l, ~Oi) DNI%tLS ~I00,7, 0'8SL6 HLdZQ dOiS · SaiT~ ~q~wdss uT un~ qIq qo~a ~o~ ~q~p ~sp~q BoI pue GMM MID~ ~ZGRfZH SIq :~clKq sT ~ aiT~qns ~d~~ · CN WN FN COUN STAT ARCO ALASKA, INC. D.S. 12-13B PB1 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 21 Tape File Start Depth = 9805.000000 Tape File End Depth = 8930.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15386 datums Tape Subfile: 4 84 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes O. 0' 6'S~I O' 0 O' 000 ' 00' 000 ' 000 ' 000 ' 000 ' . 00E8£ 0'8 0'£9 00'0I H.~Wut~IO ~I ~IO>I 0 ' ~0~8 00~'8 ~8I ~DN ~SW/1N ~00~ 6'98 0 0'6I~0I 0'0086 0'6IP0I P0'E E£'I 96-~Z~-90 : (ZH) XDNZflD.q%L~ : (NI) .~,~OGN-~fiS : (RI) NOI£DZ~OD ~%OH :XLISNZG XI~L~q4 :XI~L~ %00L NO~JJ1ZN : (i~) HLdZ~ ©NIS~D S,~Z~I~ : (MI) ZZIS iI~ Z~OH NZdO ~i~ ~NIS~D ~N-~ Z~OHZ~O~ ZdX.I. ~IOOJ, .w~OO ~IOOJ. ~tOGMZA (MOLLO~t OJ. ~Oi) ONI%~LS ~IOOJ. 0'~S£0I HLdZ~ dOiS 'ssI!~ a~P~Pdss uy un~ ~!q qo~s ~og e~p ~p~sq BoI pup ssA~nD :M~MflM ZqI~ MZGVZH Z~IM SI~ :.~ctAq. sy S ~II~qns CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 12-13B PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 16 Tape File Start Depth = 10420.000000 Tape File End Depth = 9750.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5876 datums Tape Subfile: 5 79 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~dpe Subfile 6 is~'type~: LIS 96/ 4/26 01 **** REEL TRAILER **** 96/ 4/26 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 26 APR 96 9:56a Elapsed execution time = 1.04 seconds. SYSTEM RETURN CODE = 0 H~d~G ~H~ SI SIH~ $~ ~I%d~ ~M S~IH$ H~d~ ON 0'~880I 00S'5 000'9 0'LL~0I 000'£ 00S'8 0'50~8 §E9'6 0'IL9E SL£'£I (La) HLdZ~ (MI) ZZIS (NI) ZZIS S~Zq%I~ DNZS~D a%OH 06'0~ E0'9£ 09£ ~£II N0I 8I ~ZdOOD ZNZD NHIf£ CLFi~t £ N_~%{ (/MM ~ZdOOD ZNZD Z~I~DOM NOL 9 N_Q%t (IMM ~ZdOOD ZNZO DNI~LS NOILDD~O~d DNI~LS DNI~iS ~ODZ~ DNISVD :~O0%~ ~DI~Z~ :DNIHSD~ (0 5S~ ~0~ L~)NOIIVAZSZ :qM~ :%Z& :qS~ :~N~ :dIHSNMOI :NOIID~S NOII~DO% :SSZNLIM :~NIDN~ DNID©0% :~ZSP~flN SO£ S NiI~I (IMIAI ~Zd:OOD ZNZD 00'~999 :SSZNLIM ~Oi~ZdO :~ZZNI©NZ ©NIDDO~ SIq :~clXq sT E eIT~qns FILE HEADER FILE NI/MBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 8734.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: STOP DEPTH 10839.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 8810.0 9034.0 2 9034.0 9313.0 4 9313.0 9374.0 5 9374.0 10353.0 6 10353.0 10477.0 7 10477.0 10882.0 MERGED MAIN PASS. NO GR DATA WAS RECORDED DURING MWD RUN 4. THIS INTERVAL WAS LOGGED AS PART OF MWD RUN 5. CN WN FN COUN STAT ARCO ALASKA, INC. D.S. 12-13B PB2 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * ss~Aq ~IOI ss~Aq E9 :q~BusI p~oo~ mnmTxmM :q~BusI p~os~ mnmTuTM smn~mp 916EI 89 :@pod d~H :X~mmns Bu!pom~p ~poo uoy~usss~d~ SIq 00000S'0 = Buym~dS I~A~% sII~ 000000'E£L8 = qqd~G pu~ slT~ 000000'5880I = q~d~G ~P~$ 8I~f Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8734.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8956.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 1. 01-FEB-96 1.32 2.04 MEMORY 9034.0 8810.0 9034.0 0 23.9 33.0 TOOL NUMBER NGP 184 8.500 8404.0 KCL POLYMER 9.60 42.0 11.9 22000 .0 .000 .000 .000 .000 .0 112.1 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA, INC. : D.S. 12-13B PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9040.000000 Tape File End Depth = 8732.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1852 datums Tape Subfile: 3 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes , O' 9'I~I O' 0 O' 000 ' 00' 000 ' 000 ' 000 ' 000 ' O. 000£5 O'LS 08'6 0 ' ~7058 OOfi'8 9£I E'I9 6'££ 0 0'0086 0'~£06 0'0086 ~0'E 96-S~-E0 :(ZH) XON,WflO,W%{,~ gM,W : (MI) ,~,~OGNIf,T,S 5003, : (L.~) HLd.~G DNIS%fD s,gz~I~IIgG : (MI) ZZIS LIS Z~IOH NZdO ~fL%f~ DNIS~fD ~N-~ Z%OHZgOS Z~X.L ~O0.L Z(IOD ~IO0,L gOGNZA (HOLLOS 03. dOL) DNIgLS TOOL 0'SilL6 :Z~DN%f ~IMIM (DZ~) NOIL~NI%$NI Z%OH :NOISgZA zglfML~OS Z~OHAIMO~ :NOISgZA Z~SfML~OS ZD~gfls Z~ML~OS 0'LE68 HLdZ~ L~LS Z~OD ~OOi X~S Z~I~ :ON ~Z LIS 'S~IT~ @q~d~s uT un~ qTq qmw~ ~o~ ~q~p ~sp~sq 5oI pu~ s~A~no gZGtfZH Z~I~ SIq :~clKq sT 5 SITgqns ~deL s~Xq 5IOI :q~6u~I p~o~ mnm~x~ s~Xq E9 :q35usI p~oDs~ mnm~u~x '''Sp~OD~ ~8 ~ :sI~qns ~d~i smn~p 0£I8I 89 :spoD ds~ 00000S'0 = Bu~o~dS I~A~q ~I7~ ~deL 000000'0£68 = q~ds~ puz ~I7~ ~d~L 000000'~086 = q~dsG ~S ~I7~ sd~L IE :sp~oo~ mqmG Im~OL , SZLX~ 5IOI (0 #ZdXi) GHODZH ~L~G ~ I0 0IB 06 ~ I0 0I£ 06 ~ P Id~f~f I 89 GMM M~ sqIu~ ssIdm~s spoo IOOL :ssA~nD E ~ :~I q~dsp Z~ ~Zd HidZ~ ZNO %~S~f~ : ZdOqS HL~ON : X~ ZOHG/1Ed : E~d ~£I-EI 'S'G : 'DNI '~q~S~l~ OOR-~f : NflOD N~ NM ND Tape Subfile 5 is type: LIS FILE HEADER FILE NI3MBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUFD4ARY VENDOR TOOL CODE START DEPTH GR 9286.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10289.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MIID PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 5. 10-FEB-96 1.32 2.04 MEMORY 10353.0 9374.0 10353.0 0 48.3 75.4 TOOL NUMBER NGP 136 8.500 8404.0 MIX/SALT/BIPOLY 10.2O 65.0 8.5 33250 9.6 .000 .0 .000 154.4 .000 .0 .000 .0 .00 .000 .0 0 s~Aq ~IOI :M~Bu~I p~om~ mnmyx~x s~Aq E9 :M~Bu~I p~om~ mnmyuyx · ''sp~o~ 06 S :~II~qns ~d~L smn~p 9££8 89 :~poo d~M :A~mmns Bu!poo~p ~poo uo!~u~s~d~ SI~ O0000S'O = Buyo~dS I~Sq sII~ sd~L 000000'08E6 = 000000'09£0I = qqd~G q~qS I0 018 06 ~ I0 0I£ 06 ~ ~ HHd~ I 89 GM~ ~OH sqIu~ ssIdm~s ~poD IOOl @m~N :S~A~nO E ~ :~I qqd~p sd~i tf){ Slfq-f : ,~dO~IS H,T,%ION : X~f~ ,~OH(IflMd : EM~ M£I-EI 'S'fI : 'DMI 'lf){Slfq~ ookr%f : '(IM.l,N.qS.qMd SI lfJ,tffI ON 'X~INO qRfMOI,LD.q%IIfI StfM 17 NII%t QMI4 NflOO NM ND Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10289.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10412.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 6. 12-FEB-96 1.32 2.04 MEMORY 10477.0 10353.0 10477.0 0 75.4 79.0 TOOL NUMBER NGP 184 8.500 8404.0 MIX/SALT/BIPOLY 10.20 65.0 8.5 33250 9.6 .000 .0 .000 154.4 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT ARCO ALASKA, INC. D.S. 12-13B PB2 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10480.000000 Tape File End Depth = 10280.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19374 datums Tape Subfile: 6 68 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes . O' ~'L£T O' 0 O' 000 ' 00' 000 ' 000 ' 000 ' 000 ' 000£~, S'6 0'S9 0I'6 O' LL~,OT. 000'9 ~bLr~ ~00~ ~'06 S 0 O'g880T 0'££90T O'g880T X~ON~N 50'Z Z£'l 't ND~ GMhl : (ZH) AON,qflb.~%t.~ %tM.~ : (HI) ,~.~O~N-~,LS qO0£ :(NI) NOI&D~H~OD ~qOH :XI~ilfI4 qOOi NO~JJI~N : (NI) ~ZIS &I~ ~OH N~dO ~i~ ©NI$~D CLN-~ ~OH~HOS (NOLLO~ 03, dOi) DNI%t,I.S ~IO0,1. 0'6£80I HLdZ~ dOiS 'ssIT~ ~~dss uT un~ ~Tq qo~s ~o~ ~p ~sp~q 6oi pu~ s~AxnD GMM 9 :HZ~MFi6I ZqI~ ~ZCI~fZH Z~I~ SI% :sclK~ sT £ ~iTjqns CN WN FN COUN STAT ARCO ALASKA, INC. D.S. 12-13B PB2 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 16 Tape File Start Depth = 10884.000000 Tape File End Depth = 10250.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12144 datums Tape Subfile: 7 79 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes · spuomss £5'I = ~mI~ uoy~nmsx~ p~sd~I~ ~SE:0I 96 ~d~ 9E Y~ :uo~nD~x~ ~o pu~ s~Aq ~£I :q~Bu~I p~oD~ mnm~x~ s~Aq ESI :q~BusI p~oos~ mnmsu~ IO IO /96 SIq :adz~q sT 8 SIT~qns adei