Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-041Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 10/20/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU P2-53 (PTD 196-041) Production Profile 10/05/2021 Report 10/08/2021 Please include current contact information if different from above. 37' (6HW Received By: 10/20/2021 By Abby Bell at 2:36 pm, Oct 20, 2021 STATE OF ALASKA RECENED IIVLASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERAT MAY 1 g�V q 1. Operations Performed MA 1 2018 Abandon 0 Plug Perforations m Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Ap v Plug for RedriII 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Set IB b�<JJ m 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 196-041 3. Address: P.O.Box 196612 Anchorage, Development El Exploratory 0 - AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22656-00-00 7. Property Designation(Lease Number): ADL 034624 8. Well Name and Number: PBU P2-53 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PT MCINTYRE OIL 11.Present Well Condition Summary: Total Depth: measured 11032 feet Plugs measured 10719,10816 feet true vertical 9140 feet Junk measured None feet Effective Depth: measured 10719 feet Packer measured 5120 feet true vertical 8904 feet Packer true vertical 4925 feet Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20" 41-121 41-121 1530 520 Surface Intermediate 5254 9-5/8" 40-5294 40-5051 6870 4760 Production Liner 5909 4-1/2" 5113-11022 4920-9132 8430 7500 Perforation Depth: Measured depth: 10545-10710 feet True vertical depth: 8777-8897 feet SCAN NEU J U N I 1 201 Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 38-5158 38-4952 Packers and SSSV(type,measured and 4-1/2"BAKER ZXP PACKER 5120 4925 true vertical depth) 4-1/2"HES SERIES 10 TRSSSV 2111 2110 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 110 5962 6862 0 1015 Subsequent to operation: No Test Available 1396 0 14.Attachments:(required per 20 akC 25.07025.071,&25.283) 15.Well Class after work: Daily Report of Well Operations IZI Exploratory 0 Development RI Service 0 Stratigraphic 0 Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil H Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Burton,Kaity Contact Name: Burton,Kaity Authorized Title: Pad Engineer Contact Email: Kaity.Burtonabp.com Authorized Signature: (.....41 ( i�� Date: 5/1‘,/ 18 Contact Phone: +1 907 564 5554 Form 10-404 Revised 04/2017 �r� 6`0 Ile RBDMS "� MAY 2 4 2018 4 C% � Submit Original Only • Daily Report of Well Operations PBU P2-53 ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL***(Profile modification) DRIFT,TAG, &PULL 4-1/2"HES FXE (s/n= FX405) FROM 2,074'SLM/2,111' MD. TAG HARD BOTTOM AT 10,770'SLM(Target= 10,720' md)W/3.70"CENT, S-BLR(No sample). 4/19/2018 ***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS*** ***WELL SHUT-IN ON ARRIVAL*** (SLB E-LINE CIBP SETTING) INITIAL T/I =2000/1400 PSI STANDBY FOR SNOW REMOVAL. MOVE IN, RIG UP, PT TO 3800 PSI RIH W/CCUBKR-10 SETTING TOOL/4-1/2"WEATHERFORD CIBP. TAGGED HIGH @ 9931', UNABLE TO WORK THROUGH, POOH WITH PLUG. CORRELATED TO SLB CEMENT EVALUTION LOG 16-JUNE-1996 4/30/2018 ***JOB CONTINUED ON 1-MAY-2018*** ***JOB CONTINUES FROM 30-APRIL-2018*** RIH W 3.7"GR, OAL=24', OAW=220LBS, MAX OD=3.7". CLEAR OBSTRUCTION WITH 3.7"GR @ 9931' MD. RIH W/WEATHERFORD 4-1/2"CIBP SET CIBP @ 10720'. CCL TO MID ELEMENT=7.1', CCL STOP DEPTH = 10712.9'. TOP OF CIBP @ 10719'. CORRELATE TO SLB CEMENT EVALUATION LOR 16-JUNE-1996 FINAL T/1 = 2070/1400 PSI 5/1/2018 ***JOB COMPLETE,WELL LEFT SHUT-IN ON DEPARTURE*** ***WELL S/I ON ARRIVAL SWCP 4518***(pressure test) RIG UP SWCP 4518. 5/8/2018 ***CONTINUE WSR TO 5/09/18*** ***CONTINUE WSR FROM 5/08/18 SWCP 4518***(profile mod) SET 4-1/2" HES FXE(ser#= FX405) @ 2078'SLM(2111' MD). GOOD DRAW DOWN TEST. 5/9/2018 ***WELL LEFT S/I ON DEPARTURE*** Fluids Summary Bbls Type 1 Diesel TREE CSN • P2-53 NOTES: WELL REQUIRES A SSSV. HES WEL`�'°= 10 TRSSSV LOC!®OUT. MONO BORE ACTUATOR= BAKER COMPLETION. CHROMELNR STBG. OKB.E3-EV= 523' BF.ELEV= KOP= 3600' Max Angle= 47"Q 8911' Datum MD- 10649' 2111' -14-1/2"HES SERES 10 TRSSSV,D=3.813" Datum TVD= 8800'SS u LOCI030OUT(11/13/99) _"CONDUCTOR,D= " H ? GAS LFT MANDRILS ST NO TVD DEV TYPE VLV LATCH PORT DATE Minimum ID = 3.813"@ 2110' 1 4064 4041 22 TB SO 72 26 04/09/14 HES SERIES 10 TRSSSV l 2 5078 4894 42 TB DMY 12 0 03/15/96 5113' —9-5/8"X 8-1/2"TEBACK,ID== 011110 5120' —9-518'X 8-1/2" BKR ZXP LW *1 w/BKR FLEX-LOCK I-$GR,D=6.313' 5138' Hr X 5-1/2"XO,ID=4.875" 4-1/2'TBG,126#,NT13CR-80 NSCT, H 5158' I - 0152 bpf,D=3.958" 5139' H 5-12"BKR PBR,D=4.75" 5158' —4-7/8"BKR GBH 225 SEAL ASSY,D=3.958" R 1TOP OF 4-1/2"LN5159' r/ 5159' —5-1/2"X 4-112"XO,D=3.958" I I 6261' —14-1/2"OTIS X NP,D=3.813" 9-5/8"CSG,47#,NT-80 NSCC,D=8.681" H 5294' 1-4 , PERFORATION SUMMARY REF LOG:SWS CDR/GR ON 03/13/96 ANGLE AT TOP PERF:43"(-, 10543' I ' ( 10423' —4-1/2"OTLS X NP,D=3.813" Note:Refer to Production DB for historical perf data 10422' —j ELM) LOGGED ON 06/16/96 SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 3-3/8" 6 10543-10583 S 04/08/96 04/04/14 e 2-7/8" 6 10545-10565 0 06/22/14 I 3-3/8" 6 10613-10673 S 04/08/96 04/04/14 2-7/8" 6 10613-10673 0 10/02/14 ' 3-3/8" 4 10695-10710 S 12/07/02 04/04/14 2-7/8" 6 10695 10714 0 08/11/14 I 10719'ELM —4-12"WFD CEP(05/01/18) 3-3/8" 6 10730-10770 S 05/20/04 04/04/14 3-3/8" 6 10790-10810 S 09/29/98 04/04/14 10816' -CBuIHYT(POST SOZ(TAGG®06/11/14) .�.1,' 3-3/8" 6 10830 10870 S 092 % 9!98 04/04/14 ? SAND PLUG(08/05/00) PIM — 10939' ••11, 4-1/2"LNR,12.6#,13CR-80 NSCT, —1 11022' ....-....-,„,.-.4 .0152 bpf,D=3.958' DATE REV BY COMANTS DATE REV BY COM•E4TS POM MINTY RE UNIT 03/15/96 POOL 7 ORIGINAL COMPLETION 09/03/14 CJW PJC NIFFLE/SSSV CORRECTIONS WEIL: P2-53 04/14/14 SWC/JM)GLV C/O(04/09/14) 10/02/14 M3/PJC ADF9 FS FB AF No:'1960410 06/24/14 JCMJND GLV CIO(06/22/14) 05/08/18 BTt4JM) SET CEP(05/01/18) AR No: 50-029-22656-00 06/24/14 RWM PJC CMT SQZ(TAGGED 06/11/14) SEC 14,T12N,R14E,537'FM_&1239'FV& 06/24/14 PJC CMT SOZ DATE(04/04/14) 09/03/14 RFS/PJC FR FORATIONS(8/11/14) 8P Exploration(Alaska) RECEIVED • • G^0,-( MAR 21 2017 2,46 0$ l WELL LOG TRANSMITTAL#903806268 AOGCC • To: Alaska Oil and Gas Conservation Comm. March 16, 2017 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 DAT LOGGED1 K.BENDER RE: Production Profile: P2-53 Run Date: 1/31/2017 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline&Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 P2-53 Digital Log file, Interpretation Report 1 CD Rom 50-029-22656-00 Production Profile (Final Field Print) 1 Color Log 50-029-22656-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Fanny Sari 6900 Arctic Blvd. SCANNED MAY' 2017 Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: / ,itl"v • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 S: � E AUG 8 'd)14 fq6 -o�1 Mr. Jim Regg Alaska Oil and Gas Conservation Commission 3 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the g p g annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator 0 • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM-2 Date: 04/30/2012 Corrosion Vol. of cement Final top of Cement top Corrosion Inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 10.20 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2 -08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2-09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 2.2 NA 2.2 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9 /2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2-40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2-41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2-43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P247 1951900 50029226280000 0.0 NA 0.0 NA NA NA P248 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P249 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 --? P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2-59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 _ 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 NO. 5410 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Sege 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD MPC -05A 11661124 MEMORY PROD PROFILE 01/25/07 1 L4 -03 AY1M -00032 PRODUCTION PROFILE 09/09/09 1 L5-05 AP30 -00061 PRODUCTION PROFILE 09/15/09 1 03 -24A AZCM -00042 LDL 09/14/09 1 07 -32B BOCV -00027 JEWELRY LOG/GRW/PRESS/TEMP /15/09 1 W -214 AYS4 -00095 INJECTION PROFILE 09/12/09 1 04 -26 BSJN -00014 PRODUCTION PROFILE / —2S 1 09/25/09 1 07 -21 AY54 -00098 PRODUCTION PROFILE — 09/17109 1 • W -04 BBKS -00003 PRODUCTION PROFILE 09/24!09 1 P2 -53 AP30 -00060 PRODUCTION PROFILE 09/13/09 1 S-43 AWLS -00037 PRODUCTION PROFK.E 09/25/09 1 12 -23 AWLB -00035 INJECTION PROFILE — 09/19/09 1 05-38 AYTO -00029 L M DL 09/18/09 1 W -29 AWJI -00050 EM INJECTION PROFILE 09/20/09 1 W -30 AY1M -00034 PLUGBACK W/X -FLOW CHECK 09/12/09 1 3- 37/L -35 133SQ -00024 PRODUCTION PROFILE 1,J 09/16/09 1 NK -09 AP30 -00057 USIT ATION 09/07/09 1 W -07A AWJI -00047 MEM CEMENT EVAL 09/07/09 1 11 -10 AYTU -00054 USIT 08/28/09 1 02 -06B ANHY -00111 USIT 09/21/09 1 G -iBA AWJI -00048 MEM CEMENT BOND LOG 09/17109 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd, Anchorage, AK 99503 -2838 • �C/ STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon 0 Alter Casing 0 Change Approved Program 0 2. Operator Repair WellD Pluq PerforationsD Pull TubingD Perforate New PoolO Operation Shutdown 0 Perforate ŒJ 4. Current Well Class: Stimulate 0 OtherD WaiverD Time ExtensionD Re-enter Suspended WellD 5. Permit to Drill Number: 196-0410 Name: BP Exploration (Alaska), Inc. 52.30 8. Property Designation: ADL-034624 11. Present Well Condition Summary: Development [!] Stratigraphic 0 9. Well Name and Number: P2-53 10. Field/Pool(s): Pt Mcintyre Oil Field 1 Pt Mcintyre Oil Pool ExploratoryD Service 0 6. API Number 50-029-22656-00-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Total Depth measured 11032 feet true vertical 9140.1 feet Plugs (measured) None Effective Depth measured 10810 feet true vertical 8971.9 feet Junk (measured) None Casing Conductor Liner Production Length 80 5909 5254 Size 20" 91.5# H-40 4-1/2" 12.6# 13Cr80 9-5/8" 47# NT80S MD TVD Burst 41 121 41.0 121.0 5113 - 11022 4919.9 - 9132.5 40 - 5294 40.0 - 5050.6 1490 8430 6870 Collapse 470 7500 4760 Perforation depth: Measured depth: 10543 -10583,10613 -10673,10695 -10707,10707 -10710,10730 -10770,10790 -10797,10797 -10810 True vertical depth: 8775.27 - 8804.25,8826.08 - 8870.06,8886.28 - 8895.15,8895.15 - 8897.37,8912.19 - 8941.96,8956.9 - 8962.13 8962.13 - 8971.86 Tubing ( size. grade. and measured depth): 4-1/2" 12.6# 13Cr80 @ 38 5158 Packers & SSSV (type & measured depth): 4-112" Baker ZXP Packer 4-1/2" HES TRSSSV @ 5120 @ 2111 ~~E' 't~t¿E~~~.dE""."" \\ t..!' ø '+i' : {,.P 12. Stimulation or cement squeeze summary: .,~ : ), :." ;' n 'J.f"4 Intervals treated (measured): .i~'~:frd .fJ11 & t', . Treatment descriptions including volumes used and final pressure: ' '/~ Cons. (~mm~if:"8Ji 13 Representative Daily Averaqe Production or Injection Datån~d~-' Oll-Bbl Gas-Me! Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 141 2.9 759 2100 1279 Subsequent to operation: 494 2.2 6803 2100 777 14. Attachments: 15. Well Class after proposed work: ExploratoryD Development ŒJ Service D Copies of Logs and Surveys run - 16. Well Status after proposed work: Oil Œ] GasD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. I::xempt: NIA Daily Report of Well Operations. ! 17. I hereby certify that the foreqoinq is true and correct to the best of my knowledqe. Contact Garry Catron Printed Name Garry Catron Signalure jd~ ¿~ Form 10-404 Revised 4/2004 Title Production Technical Assistant Phone 564-4657 Date 8/3/04 ,~Bfl AUG 1 A ZOOlt Form 10-404 Revised 4/2004 P2-53 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 04/27/04 WELL FLOWING ON ARRIVAL PULL 4.511 OOS SER. # 00S34, ( COTROL OPER. BAL & CHEM PLUGGED, SERIES 10 TRSSV EXT ), DRIFT W/ 33/8" DUMMY GUN TO 10,777' WLM SHORT OF TARGET DEPTH @ 10,810, CALL WLB F 04/28/04 JOB IN PROGRESS, CONT. FROM ARGWS 04/27/04.. DRIFT W/ 2 7/8" DUMMY GUN & SAMPLE BAILER TO 10,792' SLM, HARD BOTTOM (TARGET DEPTH 10,810'). NO SAMPLE RECOVERED (PERFS; 10,543- 10,870). NOTIFY PAD OPER. OF WELL STATUS, CAN RETURN TO PROD. 05/19/04 PERFORATED FROM 10790'-108101 AS PER PROGRAM WITH 3.3811 HSD 6 SPF 60 DEG PHASED POWER JET CHARGES. TAGGED TD AT 10827'.EXCESS DRAG NOTED FROM 6800' TO TD BOTH RIH AND POOH.. 400 POUNDS OF DRAG WAS N OS/20/04 ADD PERF FROM 10730'-107701 AS PER PROGRAM. TIED INTO SLB CBT LOG DATED 16. JUNE-1996 AS. 33/8" HSD 6 SPF PJ 60 DEG PHASED GUNS. GUN DRAGGING HEAVY FROM 6800'.TD. TAGGED TD AT 10827' FLUIDS PUMPED BBLS No Fluids Pumped 0 ITOTAL Page 1 "TREE = WELLHEAD = AClUA TOR = KB. ELB/ = BF. 8...B/ = KOP= tv'ax Angle = D:3tum MD = D:3tum lV 0 = CNIJ FMC BAKER C 51.9' 3600' 47 @ 8911' 10649' 8800' 55 Minimu m ID = 3.813" @ 2110' HES SERIES 10 TRSSSV 1 TOPOF 4-1/2" LNR 1-1 5129' 14-112" TBG. 12.61t.13-CR, .0152 bpf. 10= 3.958" H 5158' 9-5/8" CSG. 47#, NT-80, D =8.681" l-t 5294' PffiFORA TION SUMMARY REF LOG: SWS CDR/GR ON 03/13/96 ANGLEATTOP ÆRF: 43@ 10543' Note: Refer 10 R"oduction DB for historical perf dala SIZE SPF INTER\! AL Opn/Sqz DA TE 3-3/8" 6 10543 - 10583 0 04/08/96 3-3/8" 6 10613 - 10673 0 04/08/96 3-3/8" ..¡ 10695 - 10710 0 12/07/02 3-318" 6 10730 - 10770 0 OS/20/04 3-3/8" 6 10790 - 10810 0 05/20/04 3-3/8" 6 10790 - 10810 0 09/29/98 3-3/8" 6 10830 - 10870 0 09/29/98 P2-53 (Ð l 1 ~ ~ SAFETY NOTES: HES SERIES 10 TRSSSV LOCKED OUT. MONO BORE COMPLETION. CHROMELNR& TBG. 2110' I- 4-112"HESSERlES10TRSSSV. D = 3.813" - ""LOO<ED OUT" GAS LIFT MANDRELS ST MD lVD DEV TYPE VLV LATCH PORT DATE 1 4064 4041 22 TB 12 2 5078 4894 42 TB 12 5112' 5138' 5139' 5158' 5159' 1-1 9-518" BAKERZXPPKR,ID = 6.313" I 1-1 7" X 5-1/2" XO, 10 = 4.875" I 1-1 BAKERPBR, 10=4.75" I l-t BA KER GBH 225 SEAL ASSY I 1-1 5-112" X 4-1/2" XO. 10 = 3.958" I 5251' 1-1 4-112"CAfv1COXNIP,ID=3.813" I 1 10423' l-t 4-112"CAt\COXNIP.ID=3.813" I 1 1 0867' 1-1 SAND FlUG - 05/18/02 I ~II I PBTD H 10939' I ~ 14-1/2" LNR,12.6#,13-CR. .0152 bpf.ID =3.958" H 11022' I ~ DA TE REV BY COMMENTS 03/15/96 ORIGINAL COMPLETION 09/19/01 RNffP CORRECllONS 12/02/02 DOW/TP CHA NGE DEPfH OF SAND 12/07/02 JBfV\IlIh A DO ÆRFS OS/20/04 MJA/KAK ADO ÆRFS DATE REV BY COMMENTS POINT MONTYRE UNIT W8...L: P2-53 ÆRMIT No: 1960410 API No: 50-029-22656-00 SEe 14, T12N, R14E 690.87' FEL & 3996.69' FNL BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X MILL / ADD PERES Pull tubing _ Alter casing _ Repair well _ Other_X MILL/FCO 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 537' FNL, 4040' FEL, Sec. 14, T12N, R14E, UM At top of productive interval 3904' FNL, 999' FEL, Sec. 14, T12N, R14E, UM At effective depth 3952' FNL, 849' FEL, Sec. 14, T12N, R14E, UM At total depth 3999' FNL, 692' FEL, Sec. 14, T12N, R14E, UM 5. Type of Well: Development __X Explorato~._ Strat~graphm_.. Serv~cL (asp's 681489, 5998045) (asp's 684616, 5994754) (asp's 684766, 5994709) ~sp~ 684925, 5994666) 6. Datum elevation (DF or KB feet) RKB 52 feet 7. Unit or Property name Point Mclntyre Unit 8. Well number P2-53 9. Permitnumber/appmvalnumber 196-041 10. APInumber 50-029-22656-00 11. Field / Pool Point Mclntyre Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 120' Surface 5294' Liner 5903' 11032 feet Plugs (measured) 9140 feet 10781 feet Junk (measured) 8950 feet Tagged TD @ 10781' (12/07/2002) Size Cemented Measured Depth 20" 260 sx Arctic Set 147' 9-5/8" 1108 sx PF 'E', 375 sx 5294' 'G', 250 sx PF 'E' 4-1/2" 1142 sx Class 'G' 5129' - 10032' True VerticalDepth 147' 5051' 4932'-8392' Perforation depth: measured Open Perfs 10543'-10583', 10613'-10673', 10695'-10710', Perfs Covered with Fill 10790'-10810', 10830'-10870' true vertical Open Perfs 8775'-8804', 8826'-8870', 8886'-8897' Perfs Covered with Fill 8957'-8972', 8987'-9017' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13-CR-NT-80 Tubing @ 5158'. Packers & SSSV (type & measured depth) 9-5/8" x 7" Baker ZXP Packer @ 5112'. 4-1/2" HES Series 10 TRSSSV @ 2110'. RECEIVED DEC 1 2002 Alaska Oil & (~a~ Oon~. Commm~io~ Anehorage 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. OiI-Bbl Prior to well operation 12/06/2002 1061 Subsequent to operation 12/07/2002 1617 Representative Daily Averaqe Production or Iniection Data Gas-Mcf Water-Bbl 3600 5530 3466 5019 Casing Pressure Tubing Pressure 760 781 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil _X Gas __ Suspended _ Service 17. I hereby certify that the forego~ng/~s true and correct to the best of my knowledge. ,~ ~3,t.~.~._~~ T,IIo: Technical Assistant DeWar/ne R. Schnorr Form 10-404 Rev 06/15/88 · Date December 10, 2002 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE P2-53 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 11/14/2002 12/02/2002 1 2/06/2002 12/07/2002 1 2/07/2002 PERFORATING: DRIFT/TAG PERFORATING: MILL PERFORATING: DRIFT/TAG PERFORATING: PERFORATING TESTEVENT--- BOPD: 1,617, BWPD: 5,019, MCFPD: 3,466, AL Rate: 0 EVENT SUMMARY 11/14/O2 ( WELL FLOWING ON ARRIVAL ) DRIFT W/3.80 SWAGE 3.84 GR. PULLED 4 1/2 QOS SSSV SN# LQOS-401 CONTROL OP. NOTE: 15' OAL @ 2091' SLM DFF W/3 3/8 DG SB SD @ 10244' SLM POOH ( SB EMPTY ) D/T W/2 7/8 DG SB SD @ 10581' SLM POOH ( SB EMPTY ) <<< TARGET DEPTH IS 10,710' >>> BOTH D-GUNS APPEARED TO SETTING DOWN ON THE OUTSIDE DIAMETER OF D-GUNS <<< WELL RETURNED TO OPERATOR TO POP >>> 12/02/02 COMPLETE MU & RIH W/BAKER 2 7/8" MOTOR/3.75" THREE BLADE JUNK MILL. BEGIN MILLING @ 2 BPM @ 9000'. BEGAN SEEING SOME WEIGHT LOSS @ 9133' TO BTM. PUMP 4 BBLS FLOPRO SWEEPS EVERY 70 BBLS. MILL TO 10810'. BACKREAM TO ABOVE PERFS. PUMP 12 BBL FINAL FLOPRO SWEEP AT BTM TARGET, CHASE OUT OF HOLE WHILE BACKREAMING. FREEZE PROTECT COIL WITH MEOH. LEFT WELL FLOWING. RD. <<< TARGET DEPTH IS 10,710' >>> BOTH D-GUNS APPEARED TO SETTING DOWN ON THE OUTSIDE DIAMETER OF D-GUNS. 12/06/02 DRIFTED TO HARD BOTTOM @ 10,781' WLM W/11' X 3.50 DUMMY GUN (TARGET DEPTH -- 10,710') <<< RETURNED WELL TO DSO >>> 12/07/02 CORRELATE TO SWS JEWELRY LOG DATED 6-AUG-2000. PERFORATED 10695'-10710' WITH 3 3/8" 3406 POWERJET 4 SPF, CHARGE DATA: EH .45", PENE 38.6", GRAMS 22.7. <<< POP WELL >>> 12/07/02 TESTEVENT --- BOPD: 1,617, BWPD: 5,019, MCFPD: 3,466, AL Rate: 0 FLUIDS PUMPED BBLS 2 DIESEL FOR PRESSURE TESTING SURFACE PRESSURE EQUIP (2 TESTS) 59 METHANOL WATER 508 EXTRA SLICK 1% KCL WATER 20 FLOPRO 140000 LSRV 589 TOTAL Page I P2-53 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ADD PERFS 12/07/2002 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 3-3/8" 3406 P J, 4 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 10695' - 10710' Page 2 f- -. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Pedorate _ Pull tubing _ Alter casing _ Repair well _ Other_X (sand plug/cmt cap) 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 536' FNL, 4041' FEL, Sec. 14, T12N, R14E, UM At top of productive interval 3904' FNL, 998' FEL, Sec. 14, T12N, R14E, UM At effective depth At total depth 3997' FNL, 691' FEL, Sec. 14, T12N, R14E, UM 5. Type of Well: Development __X Exploratory__ Stratigraph lc__ Service__ (asp's 681488, 5998044) (asp's 684616, 5994753) (asp's 684924, 5994666) 6. Datum elevation (DF or KB feet) RKB 52.3 feet 7. Unit or Property name Point Mclntyre Unit 8. Well number P2-53 9. Permit number / approval number 196-041 10. APl number 50-029-22656 11. Field / Pool Point Mclntyre Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 120' Surface 5242' Production 5919' 11032 feet Plugs (measured) 9140 feet 10810 feet Junk (measured) 8972 feet top of cement cap / sand plug @ 10810'. Size Cemented Measured Depth True vertical Depth 20" 260 Sx AS 120' 120' 9-5/8" 1358 Sx PFE & 375 Sx Class G 5294' 5051' 4-1/2" 1142 sx Class G 11032' 9140' Perforation depth: measured 10543' - 10583'; 10613'- 10673'; 10790'- 10810'; (isolated under sand plug & cement cap are 10830'- 10870'). true vertical 8775' - 88o4'; 8826' - 8870'; 8957' - 8972'; (isolated under sand plug & cement cap are 8987' - 9017'). Tubing (size, grade, and measured depth) 4-1/2", 12.6#, CR13-NT80 'l'bg @ 5113' MD. Packers & SSSV (type & measured depth) 9-5/8" X 4-1/2" BAKER LINER TOP ZXP PACKER @ 5112' MD. 4-1/2' HES SERIES 10 TRSSSV @ 2110' MD. RECEIVED O? 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure Alaska 0il & Gas Cons. Commission Anchorage 14. Prior to well operation Subsequent to operation OikBbl 1702 Representative Daily Average Production or Injection Data Gas-Md Water-Bbl 1376 5800 1460 1586 5462 Casing Pressure Tubing Pressure 712 776 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __X 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,.-~~ Title: GPMA Surveillance Engineer Gordon Kidd f Date / ~"/~'-/~ ' Prepared by Paul Rauf 564-5799 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE P2-53 DESCRIPTION OF WORK COMPLETED SAND PLUG / CEMENT CAP FOR WSO Date Event Summary 4/24/2000: 4/30/2000: 8/04/2000: 8/0512000: 8/06/2000: 8/08/2000: 8/09/2000: 8/10/2000: 8/12/2000: RIH & tagged PBTD @ 10902' MD. TI FL passed. MIRU CTU. PT'd equip. RIH & milled scale f/9350' - 10900'. Tagged PBTD @ 10920'. Performed a Sand Plug & Cement Cap for WSO as follows: Loaded & killed well. RIH & tagged PBTD @ 10929'. Pumped a gelled sand slurry consisting of 1200 lbs of 20/40 mesh River Sand to place an isolation plug over the following perf interval: 10830' - 10870' MD Made a final TOS tag @ 10820'. POOH. RD. RIH &tagged PBTD @ 10797' MD. Ran jewerly log f/PBTD to 10300'. RIH & bailed sand f/10797' to 10807'. RIH & bailed sand to 10809'. RIH & bailed sand to 10815'. RIH & bailed sand to 10819'. Dump bail 6 gallons of Class G Cement. TOC - 10810'. Placed well BOL & obtained production data. RECEIVED DEC 07 000 Alaska Oil & ~as Cons. Commission Anchorage Page I UNDER THIS COVER HAS BEEN ON-OR BEFORE JANUARY 03 2001 P C:LOILKM:FILM. DOC . W M ATE IA L UNDER TH IS M ARK ER MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU' Dan Seamount, Commissioner . Blair Wondzell, ~ P. I. Supervisor FROM: J o h n C risp~/-)~.,¢ ~__,.. SUBJECT: Petroleum Id4pector DATE: July 17, 2000 Safety Valve Tests Pt. Mclntyre Field Pt. Mclntyre P-2 July 17, 2000: I traveled to Pt. Mclntyre field's Pad 2 to witness the Safety Valve System tests on Wells P2-30 & P2-53. Low pressure pilot on well P-30 failed to trip. This pilot was replaced & tested OK. Well P-53's Subsurface Safety Valve is being repaired @ this time. The AOGCC test report is attached for reference. SUMMARY: I witnessed SVS tests on Pt. Mclntyre wells P-30 & P-53. Pt. Mclntyre 2 SVS, 2 wells, 5 components, one failure. 20% failure rate. Attachments: SVS Pt. Mcintyre 2 7-17-00jc cc; NON-CONFIDENTIAL SVS Pt. McIntyre 2 7-17-00jc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: Phillips Alaska Inc Operator Rep: Rob Enderbrock AOGCC Rep: John Crisp Submitted By: John Crisp Date: Field/Unit/Pad: Pt. Mclntyre Field PM-2 Separator psi: LPS 440 HPS 7/17/00 ~:~,~:~':s~g~:~:~?;~¢ ::~.:.:, .: .,::,~..::::~::: ::. :::::::::::::::::::::::::::: .................. ,.:~:> ~. g~.~s~m ?~:[~] ~ Well Permit Separ Set L~ Test Test Test Oil, WAG, GIN& Number Number PSI PSI Trip Code Code Code GaSorCVC~ P2-01 1970730! P2-03 1970440 P2-04 1981560 P2-06 1931030 P2-07 1940580 P2-08 1981230 P2-10 1980970 P2-11 1981920 P2-12 1931150 P2-13 1970600 P2-14 1981050 P2-17 1981370 P2-18 1940600 P2-19 1970790 P2-20 1960590~ P2-21 1940530 P2-22 1972490 P2-24 1980080 'P2-25 1971110 P2-27 1971250 P2-30 1920950 440 350 100 3 P P OIL P2-31 1940360 P2-32 1951350 , P2-33B 1972310 P2-35 1951790 P2-36 1971600 P2-37 1951060 P2-40 1972260 P2-41 1952050 ~2-44 1960630 P2-45A 1971440 P2-48 1921260 P2-49 1920240 P2-50B 1950960 7/20/00 Page 1 of 2 SVS Pt. Mclntyre 2 7-17-00jc Well Permit Separ Set L/P Test Test Test Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code GAS or CYCLE P2-51 1920380 iP2-52 1972010 ~-;~'3:'~ ~'~:''''~ ~' 196'0410 440 350 340 P P OIL P2-54 1940590 P2-56 1951620 P2-57 1910790 P2-58 1900080 'P2-59A 1982010 P2-60 1910910 Wells: 2 Components: 5 Failures: 1 Failure Rate: 20.0%[-3 90 my Remarks: Well P2-30 LPP Was replaced & retested OK. SSSV on P2-53 is out for repair. 7/90/o0 Page 2 of 2 SVS Pt. Mclntyre 2 7-17-00jc STATE OF ALASKA ~-:. ALASK,~-~'L AND GAS CONSERVATION COMMIS N REPOR'I OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate__ Plugging __ Pull tubing __ Alter casing __ Repair well __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 535' FNL, 4041' FEL, Sec. 14, T12N, R14E At top of production interval 3904' FNL, 4281' FWL, Sec. 14, T12N, R14E At effective depth At total depth 3996' FNL, 690' FEL, Sec. 14, T12N, R14E Perforate Other __ 5. Type of Well: Development __~ Exploratory __ Stratigraphic __ Service __ Datum elevation (DF or KB) RKB 52.3 feet 7. Unit or Property name POINT MCINTYRE UNIT 8. Well number P2-53 9. Permit number/approval number 96-41 / 10. APl number 500292265600 11. Field/Pool Point Mclntyre 12. Present well condition summary , Total Depth: measurea: Effective Depth: Casing Conductor Surface Intermediate Liner true vertical: measured: true vertical: Length 120' 5294' Perforation depth: Size 20" 9 5/8" 11032 feet Plugs (measured) None. 9140 feet 10877 feet Junk (measured) None. 9022 feet Cemented Measured depth 260 SX Arctic Set 120' 1108 sx PF 'E', 375 sx 'G', 5294' 250 sx PF 'E' 5919' 4 1/2" 1142 sx Class G measured 10543-10583', 10613-10673', 10790-10810', 10830-10870' true vertical 8722-8751 ', 8773-8817', 8904-8919', 8934-8964' Tubing (size, grade, and measured depth) 4 1/2 in. 12.6# CR13-NT80 @ 0-5113' MD, Packers and SSSV (type and measured depth) 4 x82/3PKR@5112'MD, 34/5x41/2TRSSSV@2110'MD True vertical depth 120' 5051' 11032' 9140' JUL 22 1999 Alaska 0il & 6as Ou,~s. 60rr~missJ0n Anchorage 3. stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure OR I,¢! Ix. iAL 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure 2877 7249 934 3646 3167 373 15. Attachments 116. Status of well classification as: Copies of Logs and Surveys run __ I Daily Report of Well Operations ~ Oil ~x Gas __ Suspended __ 17. I hereby certify that the. foregoing is true and correct to the best of my knowledge. Signed .'~ .~__.~ .~_.,..,~~//,,"L./~ Title /~,.t,,-~ Tubing Pressure 742 765 Service Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE P2-53 DESCRIPTION OF WORK COMPLETED ADD PERFORATIONS Date Event Summary 09-28-1998 RIH with 3 3/8" HSD guns and added perforations at: 10850' - 10870' MD All shots at 6 SPF and 60 deg phasing. 09-29-1998 RIH with 3 3/8" HSD guns and added perforations at: 10830' - 10850' MD 10790' - 10810' MD All shots at 6 SPF and 60 deg phasing. Well: P2-53 TRSSSV-- PKR -- NIP -- NIP Perf - Perf - Perf - Perf - GPMA WEB Date' 4/15/99 APl: 500292265600 SSSV Type: CAT I - SSSV Annular Fluid: AL GAS Reference SWS CDR/GR Log: Last Tag: 10877' SLM Last Tag Date: 9/24/98 Well Type: PROD Orig Compltn: 3/15/96 Last W/O: Ref Log Date: 3/13/96 TD: 11032 ftKB Max Hole 47 deg @ 8911 Anqle: Angle @ TS: deg @ Angle @ TD: 40 deg @ 11032 Rev Reason: Schematic changes Last Update: 11/15/98 Date Note 3/17/96 Minimum ID: 3.813" HES SERIES 10 TRSSSV AT 2110' MD Date Note 3/17/96 Tubing Hanger: FMC 6 @ 38' MD 3/17/96 Well Status: ACTIVE Oth~ (Pld§~; eqUips; etc:):: JEWELRY Depth TVD Type Description ID 2110 2109 TRSSSV 4-1/2" HES SERIES 10 TRSSSV, ID=3.813" 3.813 5112 4919 PKR 9-5/8" × 4-1/2"- BAKER LINER TOP 7_XP PACKER 3.983 5251 5020 NIP 4-1/2" CAMCO X NIPPLE, ID=3.813" 3.813 10423 8687 NIP 4-1/2" CAMCO X NIPPLE, ID=3.813" 3.813 Casing Strings-Al! :: 1 Size Weight Grade Top Btm Feet Description 9.625 47.00 NT80 0 5294 5294 SURFACE CASING 4.500 12.60 CR13-NT80 5113 11032 5919 PRODUCTION LINER Tubih~ StH~g~ ~ AII~::.: I Size Weight Grade Top Btm Feet Description 4.500 12.60 CR13-NT; 0 5113 5113 TUBING Gas-Lift Mandrels/Valves:: i I Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date Vlv Mfr Type Run Comment 1 4064 4041 HES TB HES O-20R 1.5 T2 0.500 0 4/11/96 GLM 2 5078 4894 HES TB HES D-14R 1.5 T2 0.000 0 GLM Perforation~ Summary I Interval TVD Zone Status Feet SPF Date Type Comment 10543 - 8775 - 8804 40 6 4/8/96 600 PHASE, 3-3/8" GUNS 10583 10613 - 8826 - 8870 60 6 4/8/96 600 PHASE, 3-3/8" GUNS 10673 10790 - 8957 - 8972 20 6 9/29/98 ADD 60 deg phasing, 3-3/8" guns 10810 PERF 10830 - 8987 - 9017 40 6 9/29/98 ADD 60 deg phasing, 3-3/8" guns 10870 PERF PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 04/20/98 RUN RECVD 96-041 PERF REC 96-041 STATIC BHP 96 - 041 CDR 96-041 CDR-TVD 96-041 CDN 96-041 CDN-TVD 96 - 041 CBT 96-041 CET 96-041 7145 96-041 PROD PROF ~/~'SEPIA 4/8/96 / b 13 ~ ~ ~'- · ~SEPIA / 0 ~f '~ ti / 0 ~ ~ ~'- ~Jn~SEPIA 5280-11010 ~SEPIA 5090-9120 ~SEPIA 10170-11000 ~'/SEPIA 8120-9080 J~EPIA 5190-10926 J~EPIA 5100-10900 ~CDR/CDN ~ 5253-11032 ~10400-10700 04/19/96 1 04/19/96 FINAL 07/12/96 FINAL 07/12/96 FINAL 07/12/96 FINAL 07/12/96 07/12/96 07/12/96 07/12/96 07/19/96 10-407 ~OMPLETION DATE ~,'/? /'~,?~ / DA~,¥ ~,~,~, 0~ R )'/A / ~'~/ TO ': / ~ /~':'~/ Are dry ditch samples required? yes ~ And received? Was the well cored? yes ~ n~ Analysis & description received? Are well tests required? yes Well is in compliance ~/[ Initial COMMENTS nO .~ Received? yes -no ..... STATE OF ALASKA ALASKA oIL AND GAS CONSERVATION CO~,;MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 96-41 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22656 4. Location of well at surface !~~'1 9. Unit or Lease Name 537' SNL, 1239' EWL, SEC. 14, T12N, R14E ~ 'i~i : ~: .: ~~ ',~,¢~ ~' Point Mclntyre At top of productive interval : " ; ~~ 10. Well Number Attotal depth -' !,'~,~,~-~ - ~ 11. Field and Pool 3996' SNL, 4593' EWL, SEC. 14, T12N, R14E ~':'~-~'~.~i' '~: Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) 16. LeaSe Designation and Serial No. KBE = 52.3'I ADL 034624 12. Date Spudded03/02/96 I13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if OffshOre 116' NO' Of COmpletiOns03/13/96 04/08/96 N/A MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafrost 11032 9141 FT 10939 9069 FT~ R]Yes I-1No I 2111' MD] 1800' (Approx.) 22. Type Electric or Other Logs Run Gyro, MWD, LWD, CDN/CDR 23. CASING, LINER AND CEMENTING RECORD CASING SE'FI'lNG DEPTH HOLE SiZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 120' 30" 260 sx Arctic Set (Approx.) 9-5/8" 47# NT-80S 40' 5294' 12-1/4" 1108 sx PF 'E', 375 sx 'G', 250 sx PF 'E' 4-1/2" 12.6# NT13CR80 5113' 11022' 8-1/2" 1142 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 4-1/2", 12.6#, NT13CR80 5158' 5120' MD TVD MD TVD 10543'-10579' 8775'-8802' 10613'-10673' 8826'-8870' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect w/170 bbl diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) April 13, 1996 I F owing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD · I Flow Tubing Casing Pressure CALCULATED . OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. 6~sOo~s' . Form 10-407 Rev. 07-01-80 IX\~ Submit In Duplicate 29. Geologic Marker. 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Kalu bik 10531' 8767' Kuparuk River 10543' 8775' Zone UB4 10562' 8789' Zone UB1 10632' 8840' Zone MZUA 10665' 8864' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the f~ru~?ar(d cor(~ct to the best of my knowledge / Signed SteveShultz ..~L---~ '~ ~ -X'""¢"~~ ~ lt,,'~ '~ Title Senior Drilling Engineer Date ///'¢_.,,~//~ Prepared By Name/Number: Kathy Camp~amor, 564-5122 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM §: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. iTEM 28: If no cores taken, indicate 'none'. RECEIVED Form 10-407 Rev. 07-01-80 A,l~ska 0il & Gas Cons. Commission Anch0ra. ge, SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: P2-53 Rig Name: Pool 7 AFE: 2C0093 Accept Date: 03/01/96 Spud Date: 03/02/96 Release Date: 03/1 7/96 Mar 2 1996 (1) Commissioned divertor. Rig accepted 03/01/96 @ 1200 hrs. Tested divertor. MU BHA #1. Circulated at 80 ft. Drilled to 229 ft. POOH to 0 ft. RIH to 229 ft. Drilled to 304 ft. Circulated at 304 ft. Drilled to 400 ft. Mar 3 1996 (2) Drilled to 3200 ft. Mar 4 1996 (3) Drilled to 3230 ft. Circulated at 3230 ft. POOH to 600 ft. RIH to 3230 ft. Drilled to 5303 ft. Circulated at 5303 ft. Mar 5 1996 (4) Circulated at 5303 ft. POOH to 3200 ft. RIH to 5303 ft. Circulated at 5303 ft. POOH to 678 ft. Pulled BHA. Ran casing to 5293 ft (9.625 in OD). Circulated at 5293 ft. Mixed and pumped slurry- 300 bbl. Mar 6 1996 (5) Mixed and pumped slurry- 505 bbl. Displaced slurry- 371 bbl. Mixed and pumped slurry - 38 bbl. RD divertor. Installed casing spool. RU all functions. Tested casing. RU BOP stack. Tested all functions. Tested choke manifold. Installed wear bushing. Tested internal BOPs. MU BHA#2. Mar 7 1996 (6) MU BHA #2. Singled in drill pipe to 5210 ft. Circulated at 5210 ft. Tested casing - via string. Serviced block line. Serviced top drive. Drilled cement to 5313 ft. Circulated at 5313 ft. Performed formation integrity test, 14.2 ppg EMW. Drilled to 6637 ft. Circulated at 6637 ft. Mar 8 1996 (7) Circulated at 6637 ft. POOH to 5250 ft. RIH to 6637 ft. RU survey wireline unit. Conduct braided cable operations - 7/32 size cable. RD survey wireline unit. [~rilled to 7788 ft. R E C ElY E DF_C; 0 2 1996 Page 1 Alaska 0il & Gas Cons. c0mmJssJ0i~ Mar 9 1996 (8) Drilled to 8136 ft. Circulated at 8136 ft. POOH to 205 ft. Pulled BHA. MU BHA #3. Serviced BOP stack. RIH to 5250 ft. Serviced top drive. RIH to 8136 ft. Drilled to 8750 ff. Mar 10 1996 (9) Drilled to 9537 ft. Circulated at 9537 ft. POOH to 8100 ft. RIH to 9537 ft. Drilled to 9560 ft. Repaired high pressure lines. Drilled to 9769 ft. Circulated at 9769 ft. POOH to 9100 ft. Mar 11 1996 (10) POOH to 215 ft. Pulled BHA. MU BHA #4. RIH to 5250 ft. Serviced block line. Serviced top drive. RIH to 7898 ft. Logged hole with LWD: Formation evaluation (FE) from 7898 ft to 9764 ft. Circulated at 9769 ft. Circulated at 9764 ft. Drilled to 10047 ft. Mar 12 1996 (11) Drilled to 10598 ft. Circulated at 10598 ft. POOH to 9660 ft. Mar 13 1996 (12) POOH to 215 ft. Pulled BHA. MU BHA #5. RIH to 10598 ft. Drilled to 11000 ft. Mar 14 1996 (13) Drilled to 11032 ft. Circulated at 11032 ft. POOH to 9610 ft. RIH to 11032 ft. Circulated at 11032 ft. POOH to 10150 ft. Logged hole with LWD: Formation evaluation (FE) from 10130 ft to 10260 ft. Circulated at 10425 ft. POOH to 215 ft. Pulled BHA. Racked back HWDP. RU sub-surface equipment - hanger assembly. RU casing handling equipment. Mar 15 1996 (14) RU casing handling equipment. Serviced BOP stack. Held safety meeting. Ran casing to 5862 ft (4.5 in OD). RU sub-surface equipment - rotating liner hanger. Ran drillpipe in stands to 11032 ft. Circulated at 11032 ft. RU casing handling equipment. Mixed and pumped slurry - 425 bbl. Mar 16 1996 (15) Mixed and pumped slurry - 425 bbl. Displaced slurry - 193 bbl. Circulated at 5113 ft. RD casing handling equipment. Pulled drillpipe in stands to 0 ft. RD sub-surface equipment - setting tools. RU sub-surface equipment -Iocator seal assembly. Ran drillpipe to 1000 ft (5.5 in OD). Serviced block line. Serviced top drive. Ran drillpipe to 5113 ft (5.5 in OD). Tested mechanical packer- via annulus. LD drillpipe of 5300 ft. Page 2 Serviced BOP stack. RU tubing handling equipment. Ran tubing to 150 ft (4.5 in OD). Mar 17 1996 (16) Ran tubing to 5158 ft (4.5 in OD). Ran tubing on landing string to 5158 ft. Circulated at 5110 ft. Ran tubing on landing string to 5158 ft. RD handling equipment. RD BOP stack. Installed Xmas tree. Removed hanger plug. Mar 18 1996 (17) Removed hanger plug. Installed accessories. Tested tubing. Freeze protect well - 170 bbl of diesel. Installed hanger plug. Rig released 03/17/96 @ 1530 hrs. Apr 8 1996 Wirline services perforated 6 spf, 60° phasing. 10543'-10579' and 10613'-10673', 3-3/8" gun diameter, Page Halliburton Energy Services - Drilling Systems PSL Survey Report Survey Reference: WELLHEAD Reference World Coordinates: Lat. 70.24.00 N - Long. 148.31.22 W Reference GRID System: Alaska State Plane Zone: Alaska 4 Reference GRID Coordinates: (ft): 5998045.23 N 681488.64 E North Aligned To: TRUE NORTH Vertical Section Reference: WELLHEAD ClOsure Reference: WELLHEAD TVD Reference: WELLHEAD Calculated using the Minimum Curvature Method Computed using WIN-CADDS REV2.2.1 Vertical Section Plane: 135.88 deg. Page 1 Date: 6/18/96 Time: 10:17 am ~ Wellpath ID: P2-53 G-MWD ~ Date Created: 3~8~96 .~. Last Revision: 3/14/96 BPX - Shared Services Drilling Alaska State Plane: Zone4 Pt Mac: PM2 P2-53 As-Built P2-53 G-MWD Measured Incl Drift Subsea TVD Course T O T A L GRID Coordinates Closure Vertical Build Walk DLS Survey Tool Depth Dir. Depth Length Rectangular Offsets Northing Fasting Dist. Dir. Section Rate Rate (ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft) (ft) (ft) ,(ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/100ft) 0.00 0.00 0.00 -51.50 0.00 0.00 0.00N 0.00E 5998045.23681488.64 0.0C@ 0.00 0.00 0.00 0.0~)' 0.00 BPHG-PBD 100.00 0.13 165.98 48.50 100.60 100.00 0.11 S 0.03E 5998045.12 681488.67 0.11@165.98 0.10 0.13 0.00 0.13 BPHG-PBD 200.00 0.33 143.55 148.50 200.00 100.00 0.45 S 0.23 E 5998044.79 681488.88 0.51@ 153.42 0.48 0.20 -22.43 0.22 BPHG-PBD 300.00 0.38 114.90 248.50 300.00 100.00 0.82 S 0.70 E 5998044.43 681489.36 1.08@ 139.70 1.08 0.05 -28.65 0.18 BPHG-PBD 400.00 0.94 89.78 348.49 399.99 100.00 0.96 S 1.82 E 5998044.32 681490.48 2.0~@ 117.81 1.96 0.56 -25.12 0.62 BPHG-PBD 500.00 2.07 86.20 448.45 499.95 I00.00 0.84S 4.44E 5998044.51 681493.10 4.52@100.67 3.69 1.13 -3.58 1.13 BPHG-PBD 600.00 3.21 91.28 548.35 599.85 100.00 0.78 S 9.04E 5998044.67 681497.70 9.08@ 94.93 6.85 1.14 5.08 1.16 BPHG-PBD 700.00 4.21 91.36 648.14 699.64 100.00 0.93 S 15.51E 5998044.68 681504.17 15.54@ 93.43 11.47 1.00 0.08 1.00 BPHG-PBD 800.00 4.15 97.98 747.87 799.37 100.00 1.52S 22.76E 5998044.27 681511.43 22.82@ 93.82 16.94 -0.06 6.62 0.49 BPHG-PBD 900.00 3.51 87.08 847.65 899.15 100.00 1.87 S 29.41E 5998044.08 681518.08 29.4~@ 93.63 21.81 -0.64 -10.90 0.97 BPHG-PBD I000.00 2.77 85.81 947.50 999.00 100.00 1.53 S 34.87E 5998044.55 681523.54 34.91@ 92.52 25.38 -0.74 -1.27 0.74 BPHG-PBD 1100.00 1.81 75.08 1047.42 1098.92 100.00 0.95 S 38.81E 5998045.23 681527.46 38.82@ 91.40 27.70 -0.96 -10.73 1.05 BPHG-PBD 1200.00 0.92 52.36 1147.39 1198.89 100.00 0.05 S 40.97E 5998046.18 681529.60 40.97@ 90.07 28.56 -0.89 -22.72 1.02 BPHG-PBD 1300.00 0.83 6.74 1247.38 1298.88 I00.00 1.16N 41.69E 5998047.40 681530.29 41.71@ 88.41 28.19 -0.09 -45.62 0.68 BPHG-PBD 1400.00 0.81 359.18 1347.37 1398.87 100.00 2.58N 41.77E 5998048.83 681530.33 41.85@ 86.46 27.22 -0.02 -7.56 0.11 BPHG-PBD 1500.00 0.80 3.64 1447.36 1498.86 100.00 3.99N 41.80E 5998050.23 681530.33 41.9~@ 84.55 26.24 -0.01 4.46 0.06 BPHG-PBD 1600.00 0.89 358.25 1547.35 1598.85 100.00 5.46N 41.82E 5998051.71 681530.31 42.18@ 82.56 25.19 0.09 -5.39 0.12 BPHG-PBD 1700.00 0.90 352.30 1647.33 1698.83 100.00 7.01N 41.69E 5998053.26 681530.15 42.28@ 80.45 23.99 0.01 -5.95 0.09 BPHG-PBD 1800.00 0.95 2.87 1747.32 1798.82 100.00 8.62N 41.63E 5998054.86 681530.04 42.51@ 78.30 22.79 0.05 10.57 0.18 BPHG-PBD 1900.00 0.97 5.65 1847.31 1898.81 100.00 10.29N 41.75E 5998056.54 681530.13 43.0(]@ 76.15 21.68 0.02 2.78 0.05 BPHG-PBD 2000.00 1.02 5.97 1947.29 1998.79 100.00 12.02N 41.93E 5998058.27 681530.26 43.62@ 74.01 20.56 0.05 0.32 0.05 BPHG-PBD 2100.00 1.02 1.96 2047.28 2098.78 100.00 13.79N 42.05E 5998060.04 681530.34 44.2~@ 71.84 19.37 0.00 -4.01 0.07 BPHG-PBD Halliburton Energy Services - Drilling Systems PSL Survey Report Page 2 Date: 6/18/96 Weilpath ID: P2-53 G-MWD Measured Depth (ft) 2200.00 2300.00 2400.00 2500.00 2600.00 2700.00 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3350.00 3400.00 3450.00 3500.00 3550.00 3600.00 3650.00 3700.00 3750.00 3800.00 3850.00 3900.00 3950.00 4000.O0 4050.00 4100.00 4150.00 4200.00 4250.00 4300.00 4350.00 4400.00 4450.00 4500.00 4550.00 4600.00 Incl (deg.) 1.02 0.97 0.93 0.86 0.53 0.31 0.36 0.42 0.32 0.32 1.25 3.66 4.41 5.51 6.34 7.50 9.45 10.81 11.98 13.14 13.82 15.21 16.22 17.84 19.58 20.61 21.94 23.10 24.04 25.22 26.18 26.60 27.26 27.85 29.48 30.50 31.55 32.99 Drift Dir. (deg.) 1.80 8.85 11.01 20.74 31.80 24.57 357.11 34.48 31.13 72.80 115.83 124.63 122.67 130.99 132.70 134.66 132.85 133.11 137.23 135.63 137.51 137.85 138.09 138.45 138.88 138.90 138.90 138.99 138.95 138.82 138.82 138.68 138.59 138.47 138.19 137.64 137.13 136.62 Subsea Depth (n) 2147.26 2247.24 2347.23 2447.22 2547.21 2647.21 2747.21 2847.20 2947.20 3047.20 3147.19 3247.09 3296.97 3346.78 3396.51 3446.15 3495.60 3544.82 3593.83 3642.64 3691.26 3739.66 3787.79 3835.60 3882.95 3929.91 3976.50 4022.69 4068.52 4113.97 4159.02 4203.81 4248.39 4292.71 4336.58 4379.89 4422.74 4465.01 TVD (ft) 2198.76 2298.74 2398.73 2498.72 2598.71 2698.71 2798.71 2898.70 2998.70 3098.70 3198.69 3298.59 3348.47 3398.28 3448.01 3497.65 3547.10 3596.32 3645.33 3694.14 3742.76 3791.16 3839.29 3887.10 3934.45 3981.41 4028.00 4074.19 4120.02 4165.47 4210.52 4255.31 4299.89 4344.21 4388.08 4431.39 4474.24 4516.51 Course Length. (ft) 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 T O T A L GRID Coordinates Closure Vertical Rectangular Offsets Northing Easting Dist. Dir. Section (ft) (ft) (ft) (ft) (ft) (deg.) (ft) 15.57N 42.11E 5998061.82 681530.36 44.9C@ 69.71 18.14 17.30N 42.27E 5998063.55 681530.47 45.67@ 67.74 17.01 18.93N 42.55E 5998065.19 681530.72 46.57@ 66.02 16.03 20.43N 42.97E 5998066.70 681531.10 47.58@ 64.57 15.25 21.52N 43.48E 5998067.81 681531.58 48.52@ 63.66 14.82 22.16N 43.84E 5998068.45 681531.93 49.12@ 63.18 14.61 22.72N 43.94E 5998069.02 681532.01 49.4~@ 62.65 14.27 23.34N 44.13E 5998069.64 681532.18 49.92@ 62.13 13.96 23.88N 44.48E 5998070.19 681532.52 50.49@ 61.77 13.82 24.20N 44.89E 5998070.52 681532.93 51.0C@ 61.67 13.88 23.81N 46.14E 5998070.16 681534.18 51.92@ 62.70 15.03 21.52N 49.75E 5998067.95 681537.85 54.2¢@ 66.61 19.18 19.58N 52.68E 5998066.08 681540.82 56.2C@ 69.62 22.62 16.96N 56.11E 5998063.55 681544.32 58.62@ 73.18 26.88 13.52N 59.95E 5998060.20 681548.24 61.4~@ 77.29 32.03 9.35N 64.30E 5998056.14 681552.69 64.98@ 81.73 38.05 4.26N 69.63E 5998051.19 681558.14 69.7~@ 86.50 45.41 1.73 S 76.06E 5998045.35 681564.72 76.08@ 91.30 54.20 8.75 S 83.01E 5998038.51 681571.83 83.47@ 96.01 64.07 16.62S 90.51E 5998030.82 681579.52 92.02@100.40 74.94 25.08 S 98.52E 5998022.55 681587.73 101.6~@104.28 86.59 34.35 S 106.95E 5998013.49 681596.39 112.33@107.81 99.12 44.41S 116.02E 5998003.66 681605.70 124.23@110.95 112.65 55.34S 125.77E 5997992.97 681615.70 137.4C@113.75 127.28 67.38 S 136.36E 5997981.19 681626.58 152.1¢@116.30 143.30 80.33 S 147.65E 5997968.52 681638.19 168.0~@118.55 160.45 94.00 S 159.58E 5997955.15 681650.44 185.2¢@120.50 178.57 108.44S 172.15E 5997941.02 681663.37 203.4~@122.21 197.69 123.52 S 185.28E 5997926.26 681676.85 222.68@123.69 217.66 139.22S 198.98E 5997910.90 681690.93 242.85@124.98 238.47 155.54 S 213.26E 5997894.93 681705.60 263.95@126.11 260.12 172.25 S 227.91E 5997878.59 681720.65 285.68@127.08 282.32 189.24S 242.88E 5997861.96 681736.03 307.9C@127.92 304.94 206.57 S 258.19E 5997845.01 681751.76 330.6~@128.66 328.04 224.49S 274.14E 5997827.49 681768.14 354.33@129.31 352.00 243.04S 290.89E 5997809.36 681785.33 379.0~@129.88 376.98 262.00S 308.34E 5997790.82 681803.24 404.62@130.35 402.74 281.48S 326.59E 5997771.79 681821.96 431.15@130.76 429.43 Build Walk DLS Rate Rate (dg/lOOft) (dgtlOOft) (dg/lOOft) 0.00 -0.16 0.00 -0.05 7.05 0.13 -0.04 2.16 0.05 -0.07 9.73 0.17 -0.33 11.06 0.35 -0.22 -7.23 0.23 0.05 -27.46 0.17 0.06 37.37 0.26 -0.10 -3.35 0.10 0.00 41.67 0.23 0.93 43.03 1.04 2.41 8.80 2.43 1.50 -3.92 1.52 2.20 16.64 2.62 1.66 3.42 1.70 2.32 3.92 2.37 3.90 -3.62 3.94 2.72 0.52 2.72 2.34 8.24 2.85. 2.32 -3.20 2.42 1.36 3.76 1.62 2.78 0.68 2.79 2.02 0.48 2.02 3.24 0.72 3.25 3.48 0.86 3.49 2.06 0.04 2.06 2.66 0.00 2.66 2.32 0.18 2.32 1.88 -0.08 1.88 2.36 -0.26 2.36 1.92 0.00 1.92 0.84 -0.28 0.85 1.32 -0.18 1.32 1.18 -0.24 1.19 3.26 -0.56 3.27 2.04 -1.10 2.11 2.10 -1.02 2.16 2.88 -1.02 2.93 Survey Tool BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHG-PBD BPHO-PBD BPHG-PBD BPHG-PBD BPHG-PBD Halliburton Energy Services - Drilling Systems PSL Survey Report t'age .~ Date: 6/18/96 Wellpath ID: P2-53 G-MWD Measured Incl Drift Subsea TVD Course T O T A L Depth Dir. Depth Length Rectangular Offsets (fi) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft) GRID Coordinates Northing Easting (ft) (ft) Closure Vertical Build Walk DLS Dist. Dir. Section Rate Rate (ft) (deg.) (ft) (dg/lOOft) (dg/lOOft) (dg/lOOft) Survey Tool 4650.00 34.03 136.42 4506.70 4558.20 50.00 301.51S 345.59E 5997752.23 681841.43 458.63@131.10 457.03 4700.00 35.09 136.72 4547.88 4599.38 50.00 322.11S 365.08E 5997732.12 681861.42 486.87@131.42 485.39 4750.00 35.88 136.75 4588.59 4640.09 50.00 343.24 S 384.98E 5997711.47 681881.82 515.77@131.72 514.41 2.08 -0.40 2.12 0.60 1.58 0.06 2.09 BPHG-PBD 2.15 BPHG-PBD 1.58 BPHG-PBD 4800.00 36.86 136.56 4628.85, 4680.35 50.00 364.81S 405.33E 5997690.41 681902.69 545.32@131.99 544.06 4850.00 37.99 136.68 4668.56 4720.06 50.00 386.895 426.20E 5997668.84 681924.09 575.61@132.23 574.44 4900.00 39~01 137.57 4707.69 4759.19 50.00 409.70S 447.37E 5997646.56 681945.81 606.63@132.48 605.56 1.96 -0.38 2.26, 0.24 2.04 1.78 1..97 BPHG-PBD 2.26 BPHG-PBD 2.32 BPHG-PBD 4950.00 39.84 137.80 4746.31 4797.81 50.00 433.18 S 468.75E '5997623.61 681967.75 638.2~@132.74 637.30 5000.00 41.06 137.79 4784.36 4835.86 50.00 457.21S 490.54E 5997600.12 681990.12 670.58@132.99 669.72 5050.00 41.61 137.65 4821.90 4873.40 50.00 481.645 512.76E 5997576.23 682012.92 703.45@133.21 702.73 1.66 0.46 2.44 -0.02 1.10 -0.28 1.69 BPHG-PBD 2.44 BPHG-PBD 1.12 BPHG-PBD 5100.00 42.87 137.79 4858.92 4910.42 50.00 506.51S 535.37E 5997551.92 682036.13 737.0£@133.41 736.32 2.52 0.28 5150.00 43.62 137.79 4895.34 4946.84 50.00 531.88 S 558.38E 5997527.12 682059.76 771.1~@133.61 770.56 1.50 0.00 5200.00 43.98 137.83 4931.43 4982.93 50.00 557.52S 581.62E 5997502.06 682083.62 805.68@133.79 805.14 0.72 0.08 2.53 BPHG-PBD 1.50 BPHG-PBD 0.72 BPHG-PBD 5250.00 43.96 138.14 4967.41 5018.91 50.00 583.32 S 604.86E 5997476.84 682107.47 840.31@133.96 839.83 -0.04 0.62 5300.00 43.78 139.12 5003.46 5054.96 50.00 609.32S 627.76E 5997451.40 682131.00 874.85@134.15 874.44 -0.36 1.96 5350.00 44.60 139.12 5039.31 5090.81 50.00 635.67 S 650.57E 5997425.62 682154.44 909.57@134.34 909.24 1.64 0.00 0.43 BPHG-PBD 1.41 BPHG-PBD 1.64 BPHG-PBD 5400.00 43.46 140.36 5075.26 5126.76 50.00 662.19 S 673.03E 5997399.66 682177.54 944.17@134.53 943.91 -2.28 2.48 5450.00 43.62 141.40 5111.50 5163.00 50.00 688.91S 694.76E 5997373.48 682199.91 978.41@134.76 978.22 0.32 2.08 5500.00 43.77 141.79 5147.65 5199.~5 50.00 715.97 S 716.22E 5997346.94 682222.02 1012.71@134.99 1012.59 0.30 0.78 2.86 BPHG-PBD 1.47 BPHG-PBD 0.62 BPHG-PBD 5550.00 43.77 141.79 5183.76 5235.26 50.00 743.15 S 737.61E 5997320.30 682244.07 1047.07@135.21 1047.00 0.00 0.00 5600.00 44.81 142.87 5219.55 5271.05 50.00 770.79S 758.95E 5997293.19 682266.07 1081.72@135.44 1081.69 . 2.08 2.16 5650.00 45.16 142.24 5254.92 5306.42 50.00 798.85 S 780.44E 5997265.66 682288.24 1116.8C@135.67 1116.79 0.70 -1.26 0.00 BPHG-PBD 2.57 BPHG-PBD 1.13 BPHG-PBD 5700.00 45.90 141.87 5289.94 5341.44 50.00 826.99S 802.38E 5997238.07 682310.86 1152.27@135.87 1152.27 1.48 -0.74 5750.00 46.23 141.10 5324.63 5376.13 50.00 855.16S 824.80E 5997210.45 682333.96 1188.11@136.04 1188.10 0.66 -1.54 5800.00 45.81 141.30 5359.35 5410.85 50.00 883.20S 847.34E 5997182~98 682357.18 1223.94@136.19 1223.93 -0.84 0.40 1.57 BPHG-PBD 1.29 BPHG-PBD 0.89 BPHG-PBD 5850.00 45.48 141.19 5394.31 5445.81 50.00 911.08 S 869.72E 5997155.65 682380.23 1259.5~@136.33 1259.52 -0.66 -0.22 5900.00 45.65 141.75 5429.31 5480.81 50.00 939.01S 891.96E 5997128.28 682403.14 1295.12@136.47 1295.05 0.34 1.12 5950.00 45.61 142.04 5464.28 5515.78 50.00 967.13 S 914.02E 5997100.70 682425.88 1330.71@136.62 1330.60 -0.08 0.58 0.68 BPHG-PBD 0.87 BPHG-PBD 0.42 BPHG-PBD 6000.00 46.25 141.62 5499.06 5550.56 50.00 995.38 S 936.22E 5997073.01 682448.76 1366.45@136.75 1366.33 1.28 -0.84 6050.00 46.66 141.59 5533.50 5585.00 50.00 1023.78 S 958.73E 5997045.16 682471.95 1402.6fi@136.88 1402.39 0.82 -0.06 6100.00 45.50 141.25 5568.18 5619.68 50.00 1051.94 S 981.19E 5997017.57 682495.09 1438.51@136.99 1438.24 -2.32 -0.68 1.42 BPHG-PBD 0.82 BPHG-PBD 2.37 BPHG-PBD 6150.00 44.59 140.71 5603.51 5655.01 50.00 1079.43 S 1003.46E 5996990.63 682518.03 1473.81@137.09 1473.48 -1.82 -1.08 6200.00 44.54 140.70 5639.13 5690.63 50.00 1106.58 S 1025.68E 5996964.03 682540.90 1508.82@137.17 1508.44 -0.10 -0.02 6250.00 44.68 140.61 5674.73 5726.23 50.00 1133.73 S 1047.95E 5996937.43 682563.82 1543.87@137.25 1543.43 0.28 -0.18 1.97 BPHG-PBD 0.10 BPHG-PBD 0.31 BPHG-PBD 6300.00 45.04 141.03 5710.17 5761.67 50.00 1161.07 S 1070.23E 5996910.64 682586.76 1579.07@137.33 1578.57 0.72 0.84 6350.00 45.18 141.26 5745.46 5796.96 50.00 1188.66 S 1092.45E 5996883.61 682609.65 1614.42@137.42 1613.84 0.28 0.46 6386.71 44.26 141.42 5771.54 5823.04 36.71 1208.83 S 1108.59E 5996863.84 682626.27 1640.15@137.48 1639.56 -2.51 0.44 0.93 BPHG-PBD 0.43 BPHG-PBD 2.52 BPIHRMWD-PBD 6481.17 45.46 143.18 5838.50 5890.00 94.46 1261.55 S 1149.32E 5996812.14 682668.28 1706.55@137.67 1705.76 1.27 1.86 6575.22 44.86 143.13 5904.82 5956.32 94.05 1314.925 1189.31E 5996759.77 682709.56 1772.98@137.87 1771.91 -0.64 -0.05 1.83 BPIHRMWD-PBD 0.64 BPIHRMWD-PBD Halliburton Energy Services - Drilling Systems PSL Survey Report Page 4 Date: 6/18/96 Wellpath ID: P2-53 G-MWD Measured Incl Drift Subsea TVD Course T O T A L Depth Dir. Depth Length Rectangular Offsets (ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft) GRID Coordinates Northing Easting (ft) (ft) Closure Vertical Build Walk DLS Dist. Dir. Section Rate Rate (ft) (deg.) (ft) (dgtl00ft) (dg/100ft) (dg/100ft) Survey Tool 6667.81 45.58 141.61 5970.04 6021.54 92.59 1366.96 S 1229.44E 5996708.72 682750.94 1838.5C@138.03 1837.21 0.78 -1.64 6760.95 45.17 141.33 6035.46 6086.96 93.14 1418.82 S 1270.73E 5996657.89 682793.49 1904.68@138.15 1903.18 -0.44 -0.30 6852.58 45.17 140.00 6100.07 6151.57 91.63 1469.08 S 13'11.92E 5996608.66 682835.89 1969.6C@138.23 1967.94 0.00 -1.45 1.40 BPIHRMWD-PBD 0.49 BPIHRMWD-PBD 1.03 BPIHRMWD-PBD 6946.43 45.48 140.03 6166.05 6217.55 93.85 1520.21S 1354.81E 5996558.59 682880.01 2036.31@138.29 2034.50 0.33 0.03 7039.94 45.36 140.58 6231.69 6283.19 93.51 1571.46 S 1397.35E 5996508.40 682923.79 2102.87@138.36 2100.91 -0.13 0.59 7137.22 45.90 140.94 6299.71 6351.21 97.28 1625.32 S 1441.33E 5996455.64 682969.08 2172.35@138.43 2170.19 0.56 0.37 0.33 BPIHRMWD-PBD 0.44 BPIHRMWD-PBD 0.61 BPIHRMWD-PBD 7230.23 46.19 141.48 6364.27 6415.77 93.01 1677.51S 1483.28E 5996404.50 683012.29 2239.23@138.52 2236.86 0.31 0.58 7326.64 46.65 140.99 6430.73 6482.23 96.41 1731.96 S 1527.01E 5996351.13 683057.33 2308.99@138.60 2306.40 0.48 -0.51 7421.90 45.12 141.52 6497.04 6548.54 95.26 1785.30S 1569.81E 5996298.86 683101.43 2377.31@138.67 2374.48 -1.61 0.56 0.52 BPIHRMWD-PBD 0.60 BPIHRMWD-PBD 1.66 BPIHRMWD-PBD 7518.80 45.24 140.61 6565.34 6616.84 96.90 1838.76 S 1613.01E 5996246.48 683145.92 2445.98@138.74 2442.94 7610.66 45.61 140.11 6629.82 6681.32 91.86 1889.15 S 1654.75E 5996197.13 683188.88 2511.39@138.78 2508.17 7700.44 46.08 140.93 6692.36 6743.86 89.78 1938.87 S 1695.70E 5996148.43 683231.04 2575.78@138.83 2572.37 0.12 -0.94 0.40 -0.54 0.52 0.91 0.68 BPIHRMWD-PBD 0.56 BPIHRMWD-PBD 0.84 BPIHRMWD-PBD 7791.50 45.86 139.88 6755.65 6807.15 91.06 1989.32 S 1737.43E 5996099.03 683273.98 2641.22@138.87 2637.64 -0.24 -1.15 7889.25 46.05 140.84 6823.61 6875.11 97.75 2043.42 S 1782.25E 5996046.04 683320.12 2711.46@138.91 2707.68 0.19 0.98 7983.09 45.34 138.26 6889.16 6940.66 93.84 2094.52 S 1825.81E 5995996.02 683364.91 2778.6C@138.92 2774.69 -0.76 -2.75 0.86 BPIHRMWD-PBD 0.73 BPIHRMWD-PBD 2.11 BPIHRMWD-PBD 8077.55 45.49 139.54 6955.47 7006.97 '94.46 2145.22 S 1870.03 E 5995946.43 683410.36 2845.87@138.92 2841.86 0.16 1.3~ 8169.83 45.44 139.42 7020.19 7071.67 92.28 2195.22 S 19i2.77E 5995897.50 683454.31 2911.65@138.93 2907.51 -0.05 -0.13 8261.77 45.37 138.40 7084.74 7136.24 91.94 2244.56 S 1955.80E 5995849.23 683498.53 2977.11@138.93 2972.89 -0.08 -1.11 0.98 BPIHRMWD-PBD 0.11 BPIHRMWD-PBD 0.79 BPIHRMWD-PBD 8353.89 45.46 138.24 7149.40 7200.90 92.12 2293.57 S 1999.42E 5995801.32 683543.34 3042.72@138.92 3038.44 0.10 -0.17 8448.78 45.29 137.78 7216.06 7267.56 94.89 2343.76 S 2044.60E 5995752.25 683589.74 3110.25@138.90 3105.93 -0.18 -0.48 8539.78 46.34 138.56 7279.48 7330.98 91.00 2392.39 S 2088.12E 5995704.71 683634.44 3175.49@138.88 3171.13 1.15 0.86 0.16 BPIHRMWD-PBD 0.39 BPIHRMWD-PBD 1.31 BPIHRMWD-PBD 8632.43 46.56 139.35 7343.32 7394.82 92.65 2443.03 S 2132.21E 5995655.17 683679.76 3242.64@138.89 3238.18 8722.10 46.68 139.02 7404.91 7456.41 89.67 2492.35 S 2174.81E 5995606.91 683723.55 3307.81@138.89 3303.25 8815.10 46.69 138.33 7468.71 7520.21 93.00 2543.17 S 2219.49E 5995557.21 683769.47 3375.48@138.89 3370.83 0.24 0.85 0.13 -0.37 0.01 -0.74 0.66 BPiHRMWD-PBD 0.30 BPIHRMWD-PBD 0.54 BPIHRMWD-PBD 8911.46 47.02 139.36 7534.60 7586.10 96.36 2596.11S 2265.76E 5995505.43 683817.02 3445.78@138.89 3441.04 0.34 9002.54 46.77 141.14 7596.84 7648.34 91.08 2647.23 S 2308.28E 5995455.37 683860.78 3512.26@138.91 3507.34 -0.27 9093.42 45.86 143.34 7659.62 7711.12 90.88 2699.17 S 2348.52E 5995404.44 683902.29 3577.86@138.97 3572.65 -1.00 1.07 1.95 2.42 0.85 BPIHRMWD-PBD 1.45 BPIHRMWD-PBD 2.02 BPIHRMWD-PBD 9185.45 45.65 143.47 7723.83 7775.33 92.03 2752.10 S 2387.83 E 5995352.49 683942.88 3643.59@139.05 3638.01 9280.74 45.71 143.34 7790.40 7841.90 95.29 2806.84S 2428.47E 5995298.78 683984.85 3711.58@139.13 3705.60 9378.04 45.82 143.49 7858.28 7909.78 97.30 2862.82 S 2470.02E 5995243.84 684027.76 3781.1£@139.21 3774.71 -0.23 0.14 0.06 -0.14 0.11 0.15 0.25 BPIHRMWD-PBD 0.12 BPIHRMWD-PBD 0.16 BPIHRMWD-PBD 9475.03 46.26 143.55 7925.61 7977.11 96.99 2918.95 S 2511.53 E 5995188.75 684070.63 3850.72@139.29 3843.90 0.45 0.06 9568.75 46.22 144.27 7990.43 8041.93 93.72 2973.65 S 2551.40E 5995135.05 684111.84 3918.1~@i39.37 3910.93 -0.04 0.77 9606.88 44.49 144.60 8017.22 8068.72 38.13 2995.72S 2567.18E 5995113.38 684128.15 3945.22@139.41 3937.75 -4.54 0.87 0.46 BPIHRMWD-PBD 0.56 BPIHRMWD-PBD 4.58 BPIHRMWD-PBD 9638.59 43.09 143.18 8040.11 8091.61 31.71 3013.44S 2580.11E 5995095.98 684141.51 3967.09@139.43 3959.48 -4.42 -4.48 9670.64 41.71 143.13 8063.78 8115.28 32.05 3030.74 S 2593.07E 5995079.01 684154.89 3988.66@139.45 3980.92 -4.31 -0.16 9693.85 40.57 142.47 8081.26 8132.76 23.21 3042.90S 2602.30E 5995067.08 684164.42 4003.9C@139.46 3996.08 -4.91 -2.84 5.39 BPIHRMWD-PBD 4.31 BPIHRMWD-PBD 5.26 BPIHRMWD-PBD 9791.08 38.60 140.14 8156.19 8207.69 97.23 3091.27 S 2641.00E 5995019.68 684204.30 4065.81@139.49 4057.74 -2.03 -2.40 9886.79 40.19 136.33 8230.17 8281.67 95.71 3136.53 S 2681.47E 5994975.43 684245.87 4126.51@139.47 4118.41 1:66 -3.98 2;54 BPIHRMWD-PBD 3.02 BPIHRMWD-PBD Halliburton Energy Services - Drilling Systems PSL Survey Report Page 5 Date: 6/18/96 Wellpath ID: P2-53 G-MWD. Measured Incl Drift Subsea TVD Course T O T A L Depth Dir. Depth Length Rectangular Offsets (ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft) GRID Coordinates Northing Easting (fl) (ft) Closure Vertical Build Walk DLS Dist. Dir. Section Rate Rate (fl) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/100ft) Survey Tool 9978.74 40.78 132.20 8300.11 8351.61 91.95 3178.17 S 2724.21E 5994934.86 684289.62 4185.94@139.40 4178.06 10075.17 40.48 128.86 8373.31 8424.81 96.43 3218.97 S 2771.92E 5994895.26 684338.32 4247.97@139.27 4240.56 10174.58 40.48 124.97 8448.93 8500.43 99.41 3257.71S 2823.50E 5994857.80 684390.84 4311.01@139.08 4304.28 0.64 -4.49 -0.31 -3.46 0.00 -3.91 2.99 BPIHRMWD-PBD 2.28 BPIHRMWD-PBD 2.54 BPIHRMWD-PBD 10270.75 41.02 121.58 8521.80 8573.30 96.17 3292.14 S 2875.97E 5994824.68 684444.15 4371.43@138.86 4365.52 10364.02 41.80 116.36 8591.77 8643.27 93.27 3321.98 S 2929.91E 5994796.18 684498.81 4429.44@138.59 4424.49 10460.66 42.34 111.40 8663.53 8715.03 96.64 3348.16 S 2989.09E 5994771.47 684558.62 4488.3C@138.24 4484.48 10526.80 43.00 108.33 8712.16 8763.66 66.14 3363.38 S 3031.24E '5994757.29 684601.14 4527.77@137.97 4524.76 TopofKuparuk 10547.00 43.44 107.14 8726.88 8778.38 20.20 3367.59 S 3044.42E 5994753.41 684614.42 4539.73@137.89 4536.95 10558.21 43.69 106.49 8735.01 8786.51 11.21 3369.83 S 3051.81E 5994751.36 684621.87 4546.35@137.84 4543.71 10650.21 42.80 106.10 8802.02 8853.52 92.00 3387.51S 3112.31E 5994735.17 684682.79 4600.1~@137.42 4598.52 10745.62 41.94 106.51 8872.51 8924.01 95.41 3405.56 S 3174.02E 5994718.65 684744.93 4655.35@137.02 4654.44 10844.73 41.26 106.08 8946.62 8998.12 99.11 3424.03 S 3237.18E 5994701.76 684808.53 4712.04@136.61 4711.66 0.56 0.84 0.56 1.00 2.18 2.23 -0.97 -0.90 -0.69 -3.53 -5.60 -5.13 -4.64 -5.89 -5.80 -0.42 0.43 -0.43 2.37 BPHM-PBD 3.79 BPHM-PBD 3.48 BPHM-PBD 3.30 BPHM-PBD 4.58 BPHM-PBD 4.58 BPHM-PBD 1.01 BPHM-PBD 0.95 BPHM-PBD 0.74 BPHM~PBD Base Kuparuk 10925.00 40.71 106.42 9007.22 9058.72 80.27 3438.76 S 3287.72E 5994688.28 684859.43 4757.54@136.29 4757.42 10928.00 40.69 106.43 9009.49 9060.99 3.00 3439.31S 3289.60E 5994687.77 684861.32 4759.24@136.27 4759.12 10971.17 40.22 106.62 9042.34 9093.84 43.17 3447.28 S 3316.45E 5994680.47 684888.37 4783.58@136.11 4783.54 Extrapolatedto TD. ., 11032.00 39.56 106.89 9089.01 9140.51 60.83 3458.53 S 3353.81E 5994670.16 684925.99 4817.62@135.88 4817.62 -0.69 -0.67 -1.09 -1.08 0.42 0.33 0.44 0.74 BPHM-PBD 0.70 BPHM-PBD 1.13 BPHM-PBD 1.12 BPHM-PBD gyro/data ARCO ALASKA EXPLORATION P2 PAD, WELL NO. P2-53 POINT MCINTYRE FIELD, ALASKA Gyro Multishot Survey Of Drill Pipe Survey date: 07 MARCH 1996 Job number · AK0396G329 SR329.DOC Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 March 19, 1996 Arco Alaska Exploration/ B.P. Exploration(Alaska) Petrotechnical Data Center, MB 3-3 P.O. Box 196612 Anchorage, AK 99519-6612 Re: P2-PAD, WELL #P2-53, POINT MCINTYRE FIELD, AK Enclosed please find one (1) original, four (4) copies and one (1) disk of the completed survey of Well#P2-53 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely, Robert J. Shoup Operations Manager RS/fcc Serving the Worldwide Energy Industry with Precision Survey Instrumentation ~,.. ~ gyro/data i. I' ;i~ ~;r m . m CONTENTS JOB NUMBER :AK0396G329 DISCUSSION, SURVEY CERTIFICATION SHEET SURVEY DETAILS OUTRUN SURVEY LISTING QUALITY CONTROL EQUIPMENT AND CHRONOLOGICAL REPORT SR329.DOC 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR329.DOC gyro/data Tool 080 was run in P2-53 on ATLAS problems. DISCUSSION JOB NUMBER: AK0396G329 5/16" Wireline inside drillpipe. The survey was run without SR329.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER' AK0396G329 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR329.DOC gyro/data 2. SURVEY DETAILS SR329.DOC CLIENT · SURVEY DETAILS JOB NUMBER' AK0396G329 B.P. EXPLORATION RIG · P2-PAD LOCATION ' WELL · LATITUDE · LONGITUDE: SURVEY DATE' SURVEY TYPE · DEPTH REFERENCE' MAX. SURVEY DEPTH' SURVEY TIED ONTO · SURVEY INTERVAL · UTM CO-ORDINATES · TARGET DIRECTION ' GRID CORRECTION · CALCULATION METHOD' SURVEYOR · POINT MCINTYRE FIELD P2-53 70.40000 N 149 W 07 MARCH 1996 MULTISHOT IN 5.5" Drillpipe ROTARY TABLE ELEVATION 51.5 6350 NA 100' From 100 feet to 3300 feet, 50' From 3300 feet to 6350 feet, 137.21 N/A MINIMUM CURVATURE TOM STODDARD SR329.DOC gyro/data ~ 3. OUTRUN SURVEY LISTING SR329.DOC A Gyroda t a D i r e c t i ona i Survey for ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, ALASKA Job Number: AK0396G329 Run Date: 7-Mar-96 19: 7:45 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.400000 deg. N Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 137.210 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i r e c t i ona I Survey ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, Job Number: AK0396G329 ALASKA Page 1 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION. feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 100.0 .13 165.98 100.0 200.0 .33 143.55 200.0 300.0 .38 114.90 300.0 400.0 .97 89.70 400.0 0.0 .1 .5 1.1 1.9 0.0 100.0 200.0 300.0 400.0 .00 0.0 0.0 .13 .1 166.0 .21 .5 153.6 .18 1.1 139.8 .65 2.1 117.4 0.00 N 0.00 E .11 S .03 ' .45 S .22 E .82 S .69 E .95 S 1.84 E 500.0 600.0 700.0 800.0 900.0 2.07 86.20 500.0 3.7 3.21 91.28 599.8 6.8 4.21 91.36 699.6 11.3 4.15 97.98 799.4 16.6 3.51 87.08 899.1 21.4 500.0 599.8 699.6 799.4 899.1 .10 4.6 100.5 .16 9.1 94.8 .00 15.6 93.4 .49 22.9 93.8. .97 29.5 93.6 .83 S 4.50 E .77 S 9.10 E .92 S 15.58 E 1.51 S 22.84 E 1.86 S 29.48 E 1000.0 2.77 85.51 999.0 1100.0 1.81 75.08 1098.9 1200.0 .92 52.36 1198.9 1300.0 .83 6.74 1298.9 1400.0 .81 359.18 1398.9 24.9 27.1 27.9 27.5 26.5 999.0 1098.9 1198.9 1298.9 1398.9 .74 35.0 92.5 .04 38.9 91.4 .02 41.0 90.0 .69 41.8 88.4 .11 41.9 86.4 1.51 S 34.95 E .92 S 38.88 E .02 S 41.04 E 1.19 N 41.77 E 2.62 N 41.84 E 1500.0 1600.0 1700.0 1800.0 1900.0 .80 3.64 1498.9 .89 358.25 1598.8 .90 352.33 1698.8 .95 2.87 1798.8 .97 5.65 1898.8 25.5 24.4 23.2 22.0 20.8 1498.9 1598.8 1698.8 1798.8 1898.8 .06 42.1 84.5 .12 42.3 82.5 .09 42.4 80.4 .18 42.6 78.3 .05 43.1 76.1 4.02 N 41.88 _ 5.49 N 41.90 E 7.05 N 41.77 E 8.66 N 41.71 E 10.32 N 41.83 E 2000.0 2100.0 2200.0 2300.0 2400.0 1.02 5.97 1998.8 1.02 1.96 2098.8 1.02 1.80 2198.8 .97 8.85 2298.7 .93 11.01 2398.7 19.7 18.5 17.2 16.1 15.0 1998.8 2098.8 2198.8 2298.7 2398.7 .05 43.7 74.0 .07 44.3 71.9 .01 45.0 69.7 .13 45.7 67.8 .06 46.7 66.0 12.04 N 42.00 E 13.81 N 42.13 E 15.59 N 42.19 E 17.32 N 42.34 E 18.95 N 42.63 E A Gyroda t a D i r e c t i on a i Survey ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, Job Number: AK0396G329 ALASKA Page 2 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 2500.0 2600.0 2700.0 2800.0 2900.0 .86 20.74 2498.7 .53 31.80 2598.7 .31 24.57 2698.7 .36 357.11 2798.7 .42 34.48 2898.7 14 13 13 13 12 .2 .8 .5 .2 .9 2498.7 .17 47.7 64.6 2598.7 .35 48.6 63.7 2698..7 .23 49.2 63.2 2798.7 .17 49.6 62.7 2898.7 .26 50.0 62.1 20.45~N 43.05 21.55 N 43.56 22.19 N 43.92 22.75 N 44.02 23.37 N 44.21 3000.0 3100.0 3200.0 3300.0 3350.0 .32 31.13 2998.7 .32 72.80 3098.7 1.25 115.83 3198.7 3.66 124.63 3298.6 4.71 122.67 3348.5 12 12 13 18 21 .7 .8 .9 .0 .6 2998.7 3098.7 3198.7 3298.6 3348.5 .11 50.6 61.8 .23 51.1 61.7 .04 52.0 62.7 .43 54.3 66.6 .12 56.4 69.7 23.91 N 44.56 E 24.23 N 44.98 E 23.84 N 46.23 E 21.55 N 49.84 E 19.53 N 52.88 E 3400.0 3450.0 3500.0 3550.0 3600.0 5.51 130.99 3398.3 6.34 132.70 3448.0 7.50 134.66 3497.6 9.45 132.85 3547.1 10.81 133.11 3596.3 26 31 37 44 53 .0 .1 .1 .5 .2 3398.3 3448.0 3497.6 3547.1 3596.3 2.18 58.9 73.4 1.69 61.7 77.5 2.37 65.3 81.9 3.93 70.1 86.6 2.74 76.4 91.4 16.85 N 56.42 E 13.41 N 60.26 E 9.24 N 64.60 E 4.16 N 69.93 E 1.83 S 76.36 E 3650.0 3700.0 3750.0 3800.0 3850.0 11.98 137.23 3645.3 13.14 135.63 3694.1 13.82 137.51 3742.7 15.21 137.85 3791.1 16.22 138.09 3839.3 63 74 85 98 111 .1 .0 .6 .1 .7 3645.3 3694.1 3742.7 3791.1 3839.3 2.85 83.8 96.1 2.41 92.3 100.4 1.63 102.0 104.3 2.78 112.6 107.8 2.02 124.5 110.9 8.85 S 83.31 16.72 S 90.81 E 25.19 S 98.81 E 34.45 S 107.25 E 44.52 S 116.32 E 3900.0 3950.0 4000.0 4050.0 4100.0 17.84 138.45 3887.1 19.58 138.88 3934.4 20.61 138.90 3981.4 21.94 138.90 4028.0 23.10 138.99 4074.2 126.3 142.4 159.5 177.7 196.8 3887.1 3934.4 3981.4 4028.0 4074.2 3.23 137.7 113.7 3.50 152.4 116.3 2.06 168.4 118.5 2.66 185.5 120.5 2.31 203.8 122.2 55.44 S 126.06 E 67.49 S 136.65 E 80.43 S 147.94 E 94.10 S 159.87 E 108.54 S 172.45 E A Gyroda t a D i r e c t i ona i Survey ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, Job Number: AK0396G329 ALASKA Page 3 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL cOORDINATES feet 4150.0 4200.0 4250.0 4300.0 4350.0 24.04 138.95 4120.0' 25.22 138.82 4165.4 26.18 138.82 4210.5 26.60 138.68 4255.3 27.26 138.59 4299.9 216.8 237.6 259.3 281.5 304.1 4120.0 4165.4 4210.5 4255.3 4299.9 1.90 223.0 123.7 2.35 243.1 125.0 1.93 264.3 126.1 .85 286.0 127.1 1.33 308.2 127.9 123.62 S 185.57 E 139.32 S 199.27 155.64 S 213.55 m 172.35 S 228.20 E 189.35 S 243.17 E 4400.0 4450.0 4500.0 4550.0 4600.0 27.85 138.47 4344.2 29.48 138.19 4388.1 30.50 137.64 4431.4 31.55 137.13 4474.2 32.99 136.62 4516.5 327.3 351.3 376.2 402.0 428.7 4344.2 4388.1 4431.4 4474.2 4516.5 1.18 331.0 128.6 3.26 354.6 129.3 2.11 379.4 129.9 2.17 404.9 130.3 2.94 431.5 130.7 206.68 S 258.49 E 224.60 S 274.44 E 243.14 S 291.19 E 262.11 S 308.64 E 281.59 S 326.89 E 4650.0 4700.0 4750.0 4800.0 4850.0 34.03 136.42 4558.2 35.09 136.72 4599.4 35.88 136.75 4640.1 36.86 136.56 4680.3 37 . 99 136 . 68 4720 . 0 456.3 484.7 513.7 543.3 573.7 4558.2 4599.4 4640.1 4680.3 4720.0 2 . 09 458 . 9 131 . 1 2.14 487.2 131.4 1.58 516.1 131.7 1.96 545.6 132.0 2.28 575.9 132.2 301.62 S 345.89 E 322.22 S 365.38 E 343.36 S 385.28 E 364.92 S 405.63 E 387.01 S 426.50 E 4900.0 4950.0 5000.0 5050.0 5100.0 39.01 137.57 4759.2 39.84 137.80 4797.8 41.06 137.79 4835.8 41.61 137.65 4873.4 42.87 137.79 4910.4 604.9 636.6 669.0 702.1 735.7 4759.2 4797.8 4835.8 4873.4 4910.4 2.31 606.9 132.5 1.68 638.6 132.7 2.45 670.9 133.0 1.11 703.8 133.2 2.53 737.3 133.4 409.82 S 447.67 433.30 S 469.05 E 457.33 S 490.84 E 481.76 S 513.06 E 506.63 S 535.67 E 5150.0 5200.0 5250.0 5300.0 5350.0 43.62 137.79 4946.8 43.98 137.83 4982.9 43.96 138.14 5018.9 43.78 138.59 5054.9 44.60 139.12 5090.8 769.9 804.5 839.2 873.9 908.7 4946.8 4982.9 5018.9 5054.9 5090.8 1.50 771.5 133.6 .73 806.0 133.8 · 43 840.6 134.0 · 71 875.2 134.1 1.80 909.9 134.3 532.00 S 558.68 E 557.64 S 581.92 E 583.43 S 605.16 E 609.33 S 628.18 E 635.58 S 651.11 E A Gyrodata ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, Job Number: AK0396G329 ALASKA Directional Survey Page 4 MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL C O O R D I N.A T E S feet 5400.0 43.46 140.36 5126.7 5450.0 43.62 141.40 5163.0 5500.0 43.77 141.79 5199.1 5550.0 43.94 142.35 5235.2 5600.0 44.81 142.87 5270.9 943.4 977.8 1012.3 1046.8 1081.6 5126.7 2.85 944.5 134.5 5163.0 1.47 978.7 134.7 5199.1 .62 1013.0 135.0 5235.2 .85 1047.4 135.2 5270.9 1.88 1082.1 135.4 662.09 S 673.58 E 688.81 S 695.31 ' 715.88 S 716.77 E 743.20 S 738.06 E 770.98 S 759.29 E 5650.0 45.16 142.24 5306.3 .5700.0 45.90 141.87 5341.3 5750.0 46.23 141.10 5376.0 5800.0 45.81 141.37 5410.7 5850.0 45.48 141.19 5445.7 1116.8 1152.3 1188.2 1224.1 1259.8 5306.3 1.14 1117.2 135.7 5341.3 1.56 1152.6 135.9 5376.0 1.29 1188.5 136.0 5410.7 .93 1224.3 136.2 5445.7 .70 1259.9 136.3 799.04 S 780.78 E 827.18 S 802.72 E 855.35 S 825.14 E 883.41 S 847.67 E 911.30 S 870.03 E 5900.0 45.65 141.75 5480.7 5950.0 45.61 142.04 5515.6 6000.0 46.25 141.62 5550.4 6050.0 46.66 141.59 5584.9 6100.0 45.50 141.25 5619.6 6150.0 44.59 140.71 5654.9 6200.0 44.54 140.70 5690.5 6250.0 44.68 140.61 5726.1 6300.0 45.04 141.03 5761.5 6350.0 45.18 141.26 5796.8 1295.4 1331.0 1366.8 1403.0 1438.9 1474.2 1509.2 1544.2 1579.4 1614.8 5480 . 7 . 87 1295 . 5 136 . 5 5515 . 6 . 43 1331 . 1 136 . 6 5550 . 4 1 . 41 1366 . 9 136 . 8 5584 . 9 . 83 1403 . 0 136 . 9 5619 . 6 2 . 37 1438 . 9 137 . 0 5654.9 1.98 1474.2 137.1 5690.5 .09 1509.2 137.2 5726.1 .31 1544.2 137.2 5761.5 .92 1579.4 137.3 5796.8 .45 1614.8 137.4 939.24 S 892.27 E 967.36 S 914.33 E 995.60 S 936.53 E 1024.01 S 959.04 E 1052.16 S 981.49 E 1079.65 S 1003.77 _ 1106.80 S 1025.99 E 1133.96 S 1048.25 E 1161.29 S 1070.53 E 1188.88 S 1092.76 E Final Station Closure: Distance: 1614.79 ft Az: 137.41 deg. A Gyroda t a D i r e c t i ona i Survey for ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, ALASKA Job Number: AK0396G329SS Run Date: 7-Mar-96 19: 7:45 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.400000 deg. N Sub-sea Correction from Vertical Reference: 51.5 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 137.210 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a Di re c t i ona i Survey ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, Job Number: AK0396G329SS ALASKA Page 1 SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet -51.5 0.00 0.00 0.0 0.0 0.00 0.0 0.0 0 - 6350 FT. A GYRO MULTISHOT SURVEY IN 5.5 IN. DRILLPIPE ALL MEASURED DEPTHS REFERENCED TO POOL NO.7 RKB ELEV.OF 51.5 FT. 0.00 N 0.00 E 100.0 .23 154.42 151.5 .3 .17 200.0 .35 128.79 251.5 .8 .19 300.0 .68 101.92 351.5 1.5 .42 400.0 1.54 87.90 451.5 2.8 .89 500.0 2.66 88.82 551.5 5.3 1.13 600.0 3.73 91.32 651.5 9.1 1.08 700.0 4.18 94.80 751.5 14.1 .73 800.0 3.82 92.29 851.5 19.1 .74 900.0 3.12 86.26 951.5 23.2 .85 1000.0 2.27 80.03 1051.5 26.0 .90 1100.0 1.34 63.13 1151.5 27.5 1.03 1200.0 .88 28.36 1251.5 27.7 .85 1300.0 .82 2.76 1351.5 27.0 .38 1400.0 .80 1.53 1451.5 26.0 .09 1500.0 .85 .80 1551.5 24.9 .09 1600.0 .90 355.13 1651.5 23.8 .11 1700.0 .93 357.88 1751.5 22.6 .14 1800.0 .96 4.34 1851.5 21.4 .11 1900.0 .99 5.82 1951.5 20.2 .05 2000.0 1.02 3.86 2051.5 19.1 .06 .5 1.1 2.1 4.6 9.1 15 22 29 35 38 41 41 41 42 42 .6 .9 .5 .0 .9 .0 .8 .9 .1 .3 42.4 42.6 43 .1 43 .7 44.3 159.6 146.5 128.3 108.7 97.6 94.1 93.6 93.7 93 .0 91.9 90.7 89.2 87.3 85.4 83.5 81.4 79.3 77.1 75.0 72.9 .29 S .13 E .64 S .47 E .89 S 1.28 E .89 S 3.21 E .80 S 6.87 E .85 S 12.46 E 1.23 S 19.36 E 1.69 S 26.31 E 1.68 S 32.35 E 1.20 S 37.01 E .45 S 40.02 E .64 N 41.42 E 1.94 N 41.81 E 3.36 N 41.86 E 4.80 N 41.89 E 6.31 N 41.83 E 7.90 N 41.74 E 9.53 N 41.77 E 11.23 N 41.92 E 12.97 N 42.07 E A Gy r o d a t a ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, ALASKA Job Number: AK0396G329SS Directional Survey Page 2 SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL C 0 0 R D I N A T,E S feet 2100.0 1.02 1.88 2151.5 17.8 2200.0 1.00 5.52 2251.5 16.6 2300.0 .95 9.99 2351.5 15.5 2400.0 .89 16.15 2451.5 14.6 2500.0 .69 26.58 2551.5 14.0 .04 .07 .09 .12 .27 45.0 70.7 45.7 68.7 46.7 66.8 47.7 65.3 48.6 64.1 14.75 N 42.16 16.50 N 42.27 18.18 N 42.50 19.75 N 42.85 21.03 N 43.32 2600.0 .42 27.98 2651.5 13.7 2700.0 .34 10.07 2751.5 13.4 2800.0 .39 16.84 2851.5 13.0 2900.0 .37 32.71 2951.5 12.8 3000.0 .32 53.13 3051.5 12.7 .29 .19 .21 .18 .17 49.2 63 .4 49.6 62.9 50.0 62.4 50.6 62.0 51.1 61.7 21.89 N 43.75 22.49 N 43.97 23.08 N 44.12 23.66 N 44..40 24.08 N 44.78 E E E E E 3100.0 .81 95.53 3151.5 13.4 3200.0 2.53 120.48 3251.5 16.1 3300.0 4.76 123.18 3351.5 21.9 3400.0 6.42 132.84 3451.5 31.5 3500.0 9.57 132.87 3551.5 45.2 3600.0 12.13 137.03 3651.5 64.5 3700.0 14.07 137.57 3751.5 87.9 3800.0 16.63 138.18 3851.5 115.4 3900.0 19.95 138.89 3951.5 148.6 4000.0 22.53 138.95 4051.5 187.4 .66 1.77 2.12 1.74 3.83 2.79 1.84 2.33 2.98 2.48 52.0 62.2 54.3 64.8 58.9 69.9 65.3 77.8 76.4 87.0 92.3 96.6 112.6 104.9 137.7 111.7 168.4 117.1 203.8 121.3 24.02 N 45.64 22.63 N 48.14 19.37 N 53.09 13.11 N 60.56 3.95 S 70.51 9.85 S 84.26 26.86 S 100.34 47.31 S 118.81 72.19 S 140.76 101.45 S 166.27 E E E E E E E E E E 4100.0 24.86 138.86 4151.5 231.2 4200.0 26.57 138.69 4251.5 279.6 4300.0 28.12 138.42 4351.5 331.3 4400.0 30.99 137.40 4451.5 388.3 4500.0 33.87 136.45 4551.5 451.9 2.21 .94 1.53 2.14 2.22 243.1 124.6 286.0 127.0 354.6 128.8 404.9 130.1 458.9 131.0 134.50 S 195.07 170.94 S 226.97 209.67 S 261.15 252.05 S 299.39 298.42 S 342.84 A Gyroda t a D i r e c t i on a i Survey ARCO ALASKA EXPLORATION WELL: P2-53, 5.5"DP Location: P2 PAD, POINT MCINTYRE, Job Number: AK0396G329SS ALASKA Page 3 SUBSEA I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH. feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 36.16 136.70 4651.5 4700.0 38.81 137.40 4751.5 4800.0 41.29 137.73 4851.5 4900.0 43.66 137.79 4951.5 5000.0 43.80 138.54 5051.5 522.1 1.69 545.6 1~31.8 598.8 2.31 606.9 132.4 682.8 1.89 703.8 133.1 774.4 1.40 806.0 133.6 870.6 .69 875.2 134.1 349.48 S 391.06 E 405.36 S 443.53 E 467.53 S 500.12 E 535.34 S 561.70 E 606.87 S 625.99 E 5100 . 0 43 . 57 141 . 07 5151 . 5 5200.0 44.34 142.59 5251.5 5300 . 0 46 . 00 141 . 64 5351 . 5 5400 . 0 45 . 51 141 . 29 5451 . 5 5500.0 46.26 141.61 5551.5 966.9 1.91 978.7 134.7 1062.7 1.32 1082.1 135.3 1162.9 1.48 1188.5 135.9 1265.7 .72 1295.5 136.4 . 1367.9 1.40 1403.0 136.8 680.36 S 688.43 E 755.89 S 747.75 E 835.46 S 809.31 E 915.95 S 873.73 E 996.49 S 937.23 E 5600.0 44.67 140.76 5651.5 5700.0 44.94 140.91 5751.5 5745.3 45.18 141.26 5796.8 1470.8 2.02 1474.2 137.1 1569.5 .75 1579.4 137.3 1614.8 .00 1614.8 137.4 1077.02 S 1001.63 E 1153.55 S 1064.22 E 1188.88 S 1092.76 E Final Station Closure: Distance: 1614.79 ft Az: 137.41 deg. · -ii ,.~ !i 4. QUALITY CONTROL SR329.DOC Quality Control Comparisons ARCO ALASKA EXPLORATION P2 PAD, WELL NO. P2-53 POINT MCINTYRE, ALASKA Job Number : AK0396G329 / AK0396G329A INRUN/OUTRUN Comparison INRUN OUTRUN INRUN OUTRUN Depth Inc Inc Delta Az Az 4700.0 35.09 35.18 -.090 136.72 136.35 5000.0 41.06 41.11 -.049 137.79 137.85 5400.0 43.46 43.42 .047 140.36 140.98 6000.0 46.25 46.28 -.032 141.62 141.49 6300.0 45.04 45.08 -.044 141.03 141.11 For Inclinations Greater than 10 degrees: Average Inclination Difference = -.0339 deg. Average Azimuth Difference = -.0533 deg. Delta .374 -.058 -.621 .124 -.086 gyro/data QUALITY CONTROL REPORT JOB NUMBER' AK0396G329 TOOL NUMBER' 080 MAXIMUM GYRO TEMPERATURE · 73.8 C MAXIMUM AMBIENT TEMPERATURE · 41.2 C MAXIMUM INCLINATION' 45.18 AVERAGE AZIMUTH · 137.41 WIRELINE REZERO VALUE · 0.0 REZERO ERROR / K' CALIBRATION USED FOR FIELD SURVEY' 1248 CALIBRATION USED FOR FINAL SURVEY · 1248 PRE JOB MASS BALANCE OFFSET CHECK' .35 POST JOB MASS BALANCE OFFSET CHECK~ · CONDITION OF SHOCK WATCHES .50 USED .50 UPON ARRIVAL AT RIG · OK UPON COMPLETION OF SURVEY' OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD FIELD SURVEY 6350 45.18 141.26 5796.8 FINAL SURVEY 6350 45.18 141.26 5796.8 NORTHING 1188.88 S 1188.88 S EASTING 1092.76 E 1092.76 E SR329.DOC gyro/data FUNCTION TEST JOB NUMBER · AK0396G329 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION I M.D. ft 1 2 3 4 5 6350 45.18 45.18 45.18 45.18 45.18 AZIMUTH M.D. ff 1 2 3 4 5 6350 141.26 141.13 141.56 141.43 141.26 SR329.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR329.DOC gyro/data · ;: EQUIPMENT REPORT JOB NUMBER' AK0396G329 DOWNHOLE ELECTRONICS PRIMARY TOOL No. 080 GYRO SECTION A0099 DATA SECTION C0031 POWER SECTION C0006 BACKUP TOOL No. 713 GYRO SECTION A0088 DATA SECTION C0023 POWER SECTION- C0022 WIRELINE COMPANY' CABLE SIZE' SURFACE ELECTRONICS COMPUTER A0213 POWER SUPPLY A0085 PRINTER A0029 INTERFACE A0035 COMPUTER A0215 POWER SUPPLY A0055 PRINTER A0079 INTERFACE A0071 ATLAS WIRELINE 5/16" RUNNING GEAR 2 1/2" SYSTEM TOTAL LENGTH OF TOOL' MAXIMUM O.D.' TOTAL WEIGHT OF TOOL' 32.0 feet 2.5 INCHES 270Lbs SR329.DOC CHRONOLOGICAL REPORT JOB NUMBER' AK0396G329 07/03/96 07:00 07:30 08~.30 10:15 13:30 14:30 15:30 16:45 18:00 DRIVE TO LOCATION ARRIVED AT LOCATION SpOT UNIT, MAKE UP TOOL, STAND BY FOR RIG RUNNING IN HOLE AT3800 AT 6350 LAY DOWN AND BREAK DOWN TOOL PROCESS SURVEY. RETURN TO ATLAS AND PACKED UP TOOLS. SR329.DOC GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10294 Company: Alaska Oil & Gas Cons Comm Attn: Howard Okland 3001 Porcupine Drive Anchorage, AK 99501 7/18/96 Field: Greater Point Mclntyre Area [Lisburne, L6-26, Pt. Mclntyre, and West Niakuk (NK-27)] Floppy Well Job if Log Description Date BL RF Sepia Disk P1-03 ~e~ bt') ,..,/ PRODUCTI(~N PROFILE 960705 I 1 P2-53 ~{~ ~.~{ ,,/ ..PRODUCTION PROFILE 960707 .I 1 LISBURNE LGI-04 ~ 6 ! ~ ~ i PERFORATiNG RECORD 960629 I 1 L5-5 ~7 0-b~ ~.. PERFORATiNG RECORD 960702 I 1 L 5-17 ~'~ ~ ~ ~ .--" PERFORATiNG RECORD 960630 I . .1. .L. 5-36 ~ ~1~ ~ PERFORATiNG RECORD 960708 I 1 .L5-36 ~[ t) ~10 ~-/ PERFORATiON RECORD 960709 I I SIGNED: ~ ~~,/~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED JUL 'i 9 ]996 Alaska 0il & Gas Cons. ~m~ussi0n Anchorage 7/9/96 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10279 Company: Attn: Laura Lahrson Alaska Oil & Gas Cons Comm Attn: Howard Okland 3001 Porcupine Drive Anchorage, AK 99501 Field: Greater Point Mclntyre Area [Lisburne, L6-26, Pt. Mclntyre, and West Niakuk (NK-27)] Floppy Well Job # Log Description Date BL RF Sepia Disk P2-53 ~-CDR 960313 I 1 P2-53 .--'CDN 96031 3 I 1 P2-53 ~'~DR TVD 96031 3 I 1 P2-53 c.'C~DN TVD 96031 3 I 1 P2-53 96092 CDPJCDN 96031 3 I ~ SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. JUL 1 2 1998 Alasi(a Oil & Gas 0o,$. Commission A~chom§e GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10279 Company: Alaska Oil & Gas Cons Comm Attn: Howard Okland 3001 Porcupine Drive Anchorage, AK 99501 7/9/96 Field: Greater Point Mclntyre Area [Lisburne, L6-26, Pt. Mclntyre, and West Niakuk (NK-27)] Floppy Well Job # Loq Description Date BL RF Sepia Disk P2-53 - I~B~. 960616 1 1 P2-53 ~.-CET 960616 I 1 , SIGNED: ~ ¢~~// DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. JUL 1 2 199.S ~! & G~s Co:~s. Comrnissio. ,,~chorage GeoQuest ' 500 W. International Airport ROad Anchorage, AK 99518-1199 .,, ATTN: Sherrle ,, r'' NO. 10134 Company: Field: , ,, · Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Well Job # Log Description Date BL Greater Point Mclntyre Area [Lisburne, L6-26, Pt. Mclntyre,' and West Niakuk (NK-27)] :' Floppy RF Sepia Disk CDR/SLIM-1 950929 I 1 P2-32 ':i(: (~ ";:L,' ~ CDR/SLIM-1 TVD 950929 I 1 P2-32PB :' ~: 9535:1 CDR/CDN 95091 7 1 P2-32PB CDR 95091 7 1 1 , P2-32PB CDN 95091 7 1 1 P2-32PB , CDR TVD 95091 7 I 1 P2-32PB CDN TVD 95091 7 1 1 P2-53 c[~- 0~[l_ Z.. PERFORATION RE.'.CORD 960408 I I .... 'P2-53 STATIC REP SURVEY 960408 I I 4/'17~96 SIGNED: Please sign and return one copy of this transmittal tO Sherrie at the above address. Thank you. /=, ',,', i.,:, /? ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLE$, GOVE~qNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 February 21, 1996 Steve Shultz, Senior Drilling Engineer ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Point Mclntyre P2-53 ARCO Alaska, Inc. Permit No: 9641 Sur. Loc. 537'SNL, 1239'EWL, Sec. 14, TI2N, R14E, UM Btmhole Loc. 1324'NSL, 606'WEL, Sec. 14, T12N, R14E, UM Dear Mr. Schultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. hnston ' BY ORDER OF THE COMMISSION dlf/Enclosures Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 la. Type of work Drill [] Redrill [-Illb. Type of well. ExploratoryF-1 Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenFII Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. Plan RTE= 52 feet Point Mclntyre 3. Address 6. Property Designation P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 034624 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 537' SNL, 1239' EWL, SEC. 14, T12N, R14E Point Mclntyre At top of productive interval 8. Well number Number 1401' NSL, 948' W£L, SEC. 14, T12N, R14E P2-53 U-630610 At total depth 9. Approximate spud date Amount 1324' NSL, 606' WEL, SEC. 14, T12N, R14E 02/24/96 $200,000.00 ~12. Distance to nearest i13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVP) property line ADL 365548 3956 feet P2-54, 13.3'@(+/-)400'MD feet 2560 11037'MD/9129'TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 300 feet Maximum hole angle4z.~3 o Maximum surface 3250 psig At total depth (TVD) 8852'/4150 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 94# H-40 Weld 80' Surface Surface 80' 80' 260 sx Arcticset (Approx.) 12-1/4" 9-5/8" 47# NTaOS NSCC 5262' 41' 41' 5303' 5052' 1098sxPF'E', 375sx 'G; 250sxPF'E' 8-1/2" 4-1/2" 12.6# lacRaO NSCT 5887' 5150' 4945' 11037' 9129' 315 sx 'G', 250 sx 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~ ~ ~.~ '~ ~ '~,f' ~ [~ Surface Intermediate F EE~ 20 1996 Production Liner Perforation depth' measured AiaskaO!! &O?;: Col~s. true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirementsi--1 21.1 hereby c~ theRfolreg~i,ng is true and correct to the best of my knowledge Signed ,~,..(._/././~ /4~'~ Title Senior Drillin~ Engineer Date Commission Use Only Permit Number APl number Approval date See cover letter ~' -~Z/ 50-O~-_~- .~---.~.~',,~'~" I ,~.--~/"'-~),,~ for other requirements Conditions of approval Samples required [] Yes [] No Mud Icg required []Yes ~ No Hydrogen sulfide measures [] Yes [] No Directional survey required ]~ Yes [] No Required working pressure for BOPE []2M; []3M; ~5M; [-I10M; []15M; Other: Original Signea By by order of Approved by Fl~vid W. ,lr hnston Commissioner [ne comm,ssion Date Form 10-401 Rev. 12-1 Submit in I Well Name: IP2-53 Well Plan Summary I Type of Well (producer or injector): I Producer Surface Location: 537' FNL, 1239' FWL, SEC 14 T12N, R14E Target Location: 1401' FSL, 948' FEL, SEC 14, T12N, R14E Bottom Hole 1324' FSL, 606' FEL, SEC 14, T12N, R14E Location: I AFE Number: 12C0093 I I Rig: I Pool#7 I Estimated Start Date: ] Feb 24' 19961 IOperating days t°complete: IMD: I 11,037' I ITVD: I9129' I ]Welletc.): Design (conventional, slimhole, [Monobore 17 I KBE: ]52.7' Formation Markers: (all depths feet RKB) Formation Tops MD TVD 13 ase Permafrost 1788 1787 UG4A (K-15) 5416 5132 Lower Ugnu 7061 6312 WEST SAK 7898 6912 Minimum mud weight required: 9.5 ppg K-10 10096 8487 K-5 10351 8662 HRZ 10461 8737 KALUBIK 10542 8792 KUPARUK 10557 8802 Minimum mud weight required: 9.8 ppg TD 11037 9129 Casing/Tubing Program: (all depths feet RKB) Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MD/TVD O.D. 30" 20" 94# H-40 WLD 80 GL 80/80 12 1/4" 9 5/8" 47# NT80S NSCC 5262 41/41 5303/5052 8 1/2" 4 1/2" 12.6# 13CR80 NSCT 5887 5150/4945 11037/9129 TBG 4 1/2" 12.6# 13CR80 NSCT 5110 40/40 5150/4945 Well Plan Summary P2-53 FEB 20 ]996 .... A~;c;h0r~ge Page 1 Logging I Open Hole Logs: SURFACE PRODUCTION ICased Hole Logs: ,ram. MWD only MWD GR/Resistivity/Neutron/Density (From top of HRZ to TD) GR from West Sak to Kuparuk (MAD) GR/USIT/CET/CCL Mud Program: ISpecial design considerations 3% KCL mud through Kuparuk Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.7 300 40-60 30-60 60-80 9-10 15-25 Intermediate Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 50 20-40 15-20 20-30 9-10 4-6 Production Mud Properties: I 3% KCL (open hole change over) Density PV Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.8 to 8-15 25-30 5-15 10-20 9-10 4-6 10.2 HTHP<15 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. ~ ~ ..... :~,../.. ~:..!i ?!! Directional: I KOP: 130o' Maximum Hole Angle: Close Approach Well: 47.13° Angle; 137.5° Azimuth ......... '~" P2-50B (producer): 24.8' away at +1150'MD P2-54 (producer): 13.3' away at +400'MD The above listed wells will be secured during the close approach. P2-53 Well Plan Summary Page 2 P2-53 Drilling Hazards/Risks Abnormal differential reservoir pressure should not be encountered in this well. The BHL is offset by two producers and one injector: 1800' SE of P1-05; 1200' W of P2-54 and 2500' SSW of P2- 42i. Production/injection logs have not been run in offsets. The Terrace Fault is located 400' S of the proposed top Kuparuk formation. Original reservoir pressure is 4350 psia at 8852' TVD. The most likely reservoir pressure is estimated at 4150 psi (9.0 ppg), but could range from 4050 to 4250 psi at 8852' TVD. Two close approach well has been identified which will be shut in while drilling the close approach zone (see above). Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. P2-53 Well Plan Summary Page 3 P2-53 Operations Summary 1. MIRU drilling rig. NU and function test diverter. , Spud well and drill 12 1/4" hole to 300' md; begin eastward nudge per attached directional plan. Drill to 325 l'---~ck off and build angle to 44.2° inclination at 137.58° azimuth. Hold angle to 5303' MD surface hole TD. , Run and cement 9 5/8" casing; perform top job. Test casing to 3000 psi for 10 minutes. Nipple up BOP's and test same to 5000 psi. Note AOGCC witness or waiver on the morning report. 4. PFU 8 1/2" BHA, drill 10' new hole and perform LOT. . Drill ahead and hold 44.2° to 9963'; build angle to 47.13° at 137.5° azimuth. Hold angle and azimuth to top of HRZ at 10461'. Perform open-hole change over to 3% KC1 polymer mud at 10.2 ppg. Drill to 11037' TD, holding angle and azimuth. Obtain LWD logs through Kupamk and MAD pass on trip out of hole. , POH and stand back drill pipe. Run 4 1/2" NT-13Cr-80 liner and cement per attached cement program~displace with seawater. Bump plug and set liner top packer. Release and displace 9 5/8" casing to filtered seawater. , Run dummy seal assembly and test the casing to 4000 psi for 30 minutes. Run 4 1/2" NT- 13Cr-80 tie-back string/completion assembly. Sting liner tieback seals into liner top. Test tubing and annulus to 4000 psi. , Shear RP valve in top GLM. Displace tubing to diesel, U-tube to freeze protect the annulus. 9. ND BOP and NU tree assembly. Test tree assembly to 5000 psi. 10. Secure well, release rig. POST RIG WORK 1. Replace RP valve with dummy or glv as required. Perforate and flow test well. P2-53 Well Plan Summary Page 4 P2-53 Cement Cemen[ Supplier: Halliburton I Surface String Sudace string cement based onshoe volume ~lus 375 sacks of tail slur~, plus load to surfak, both slurries with 70% excel. Spacer 7 5~bbls Fresh water ..... LEAD (TYPE E' PERMAFROST} Volume 1098 Sacks (2383 ft3) (424 bbls) Casing depth 5262 f t Length 4474 f t Casing size 9.625 in Yield 2.17 ft3/sack Casing ID 8.681 in Density 12 ppg Casing weight 47 Ib/ft TOC 40 ff MD Bit diameter 12.25 in Mix water 11.55 gps 50° - 65° Fresh Excess factor 1.7 Thicken time 4 hrs Shoe track 8 0 f t CIRCTEMP 5 0 Deg F TAIL (Class 'G' + 2% CaCI2 accelerator ) Top of Lead 4 0 f t Volume 375 Sacks (431 ft3) (77 bbls) Top of Tail 4514 ft Length 748 ft Yield 1.15 Density 15.8 ppg TOC 4514 ft Mix water 5 gal/sk Fresh ~Thicken time 3.5 hrs TOP JOB (Type 'E' PERMAFROST) Volume 250 Sacks (115 ft3) (21 bbls) Yield 2.171 ft3/sack ,, Density 12 ppg Mix water 11.55 gal/sk Fresh Production String I Base lead cement volume on 500' MD above the Lower Ugnu (6312' TVDss) plus 20% excess. Tail should be 1000' above the Kuparuk plus 20% excess. Lab test cemenVspacer/mud program to ensure compatibility before job. Ensure thickening times are adequate relative to pumping job requirement. Displace at maximum rate without inducing losses (15 bbVmin or greater if possible) / Preflush 2 0 bbls Fresh water Spacer 7 0 bbls NSCI SPACER LEAD (Class 'G' +3% Econolite) Volume 315 SacksI (1020 ft3) (182 bbls) Additives: 0.4% CFR3 dispersant 2.0% HALAD 344 Fluid loss Casing depth 11037 ft Length 2996 if t Casing size 4.5 in Yield 3.24 ft3/sack Casing ID 3.958 in Density 1 1 ppg Casing weight 12.6 Ib/ft TOC 6561 ft MD Bit diameter 8.5 in Excess factor 1.2 TAIL (CLASS G' Premium) Shoe track 80 ft Volume 444 Sacks (511 ft3) (91 bbls) CIRCTEMP 140 Deg F Additives: ;0.2% CFR3 dispersant Top of Lead 6561 ft 0.4% HALAD 344 Fluid loss Top of Tail 9557 ft 0.1% HR-5 Length 1480 ft Yield 1.15 ft3/sack Density 15.8 Ippg TCC 9557 ft MD Thicken time 4-5 hrs ~PX-~Ho,~ ed Services AI.o. sko, ~i;o,-I;e Plo. ne: Zone4 Pt No, c : PN2 P~-53 As-~Buit-t; P~-53 Wp 1 H3RIZI3',q'AL VIEW CTRUE lxi3~'l'l-D SCALE 50O Ft. / DIVISIE1N SLRVEY REF: ',IELU-'EAD I-LZ~_L ,'TEN 7C~ VERTICAL VIEW SCALE 500 Fi;. / DIVISDZI~I TVD RE}-: WELLFF_AD VEI~T1C~N_ SECTIDN REF: WELLED .4.5~4 e ,70~ 1,~ t.oe~ Ll~nu I I I VE]~I'IC,~L SECTII3N ~: 134,~ ~ POINT DATA 4~1/~ m 11117 47.13 103J;)4 ~TVD 0128.54 11117,45 4849,07 341923 WELL PERMIT CHECKLIST COMPANY ,II So redrll [] serv [] w ON/OFF SHORE ADMINISTRATION ENGINEERING 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permit fee attached ................... Lease number appropriate ................ Unique well name and number ............... Well located in a defined pool ............. Well located proper distance from drlg unit boundary.. Well located proper distance from other wells ...... Sufficient acreage available in drilling unit ...... IY If deviated, is wellbore plat included ......... ;Y Operator only affected party .............. Operator has appropriate bond in force ......... pY Permit can be issued without conservation order .... JY Permit can be issued without administrative approval.. !.Y Can permit be approved before 15-day wait ........ REMARKS A~PR 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg..~ ~N 17. CMT vol adequate to tie-in long string to surf csg . . . 18. CMT will cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............. N 21. If a re-drill, has a 10-403 for abndnmnt been approved..T----N~ 22. Adequate wellbore separation proposed ......... .(Y~ N 23. If diverter required, is it adequate .......... .~ N 24. Drilling fluid program schematic & equip list adequate N 25. BOPEs adequate.. ................... N 26. BOPE press rating adequate; test to ~ psig.O N 27. Choke manifold complies w/AP1 RP-53 (May 84) ...... ~~/~C 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............ GEOLOGY / 30. Pe~it can be issued w/o hydrogen sulfide measures .... Y N / 31. Data presented on potential overpressure zones ..... Y ~ 32. Seismic analysis of shallow gas zones. Y 33. Seabed condition su~ey (if off-shore) ......... Y N 34. Contact name/phone for weekly progress reports ..... Y N [~plorato~ only] GEOLOGY: ENGINEERING: COMMISSION: JDH ~ JDN Comments/Instructions: HOWlljb - A:\FORMS~cheklist rev 11195 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~6096 : ON 00-959~-6~0-0~ : H~6U4[2N Id¥ ~JO~S H£HON : HDzqOHO~ HHX£NID~q £NIOd : ~kSfN <~I~ f g - ~ : ~14VN 'DNI V~S%/~IV ODHV : ~ASfN LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 PAGE: **** REEL HEADER **** SERVICE NA~E : EDIT DATE : 96/07/ 3 ORIGIN · FLIC REEL NAME : 96092 CONTINUATION # : PREVIOUS REEL : COMPIENT : ARCO ALASKA, INC., PT. MCINTYRE P2-53, API# 50-029-22656-00 **** TAPE HEADER **** SERVICE NA~E : EDIT DATE : 96/07/ 3 ORIGIN : FLIC TAPE NAME : 96092 CONTINUATION # : 1 PREVIOUS TAPE : COM~EIFT : ARCO ALASKA, INC., PT. MCINTYRE P2-53, API# 50-029-22656-00 TAPE HEADER POINT MCINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL : FSL: FEL: FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING P2 - 53 500292265600 ARCO ALASKA INC. SCHLUMBERGER WELL SERVICES 3-JUL-96 BIT RUN 1 ......... 630380 ST. AMOUR PEAK BIT RUN 2 630380 ST. AMOUR PEAK BIT RUN 3 14 12N 14E 537 1239 51.85 51.85 11.50 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 5294.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 3RD STRING PRODUCTION STRING REMARKS: THIS FLOPPY CONTAINS ONLY THE EDITED AND MERGED FILES AND NO RAW DATA DUE TO SIZE RESTRICTIONS. AND NO RAW DATA DUE TO SIZE RESTRICTIONS. Well drilled 10-MAR through 13-MAR-96 with CDR/CDN. Ail data was collected in two bit runs. MAD data was collected for the CDR on bit run 1 and for the CDN on bit run 2. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SU~fl~%RY LDWG TOOL CODE $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 5252.0 9769.0 10596.0 11032.0 BASELINE DEPTH 88888.0 10886.0 10829.5 10785.5 10762.0 10689.0 10678.0 10669.5 10665.0 10658.0 10646.0 10630.5 10620.5 10615.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... 88890.5 10888.5 10828.5 10784.0 10763.5 10691.0 10678.0 10668.0 10666.5 10659.0 10647.0 10630.5 10621.0 10615.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 10608.5 10589.5 10562.5 10545.5 10541.0 10514.5 10506.5 10482.0 10474.5 10464.0 10461.0 10456.0 10451.0 10449.0 10441.0 10418.0 10397.5 10381.0 10378.5 10360.0 10332.0 10306.5 10265.5 10257.0 10246.5 10227.0 10211.5 10205.5 10182.0 10151.0 10113.5 10071.5 10055.0 10049.5 10042.5 10023.0 9996.5 9974.0 9959.0 9945.5 9934.0 9911.0 9895.5 9890.0 9869.0 9849.5 9834.5 9833.0 9826.5 9811.0 9791.5 9743.0 9729.5 9690.0 9675.0 10609.0 10589.5 10563.0 10547.0 10543.0 10515.5 10507.0 10483.0 10475.5 10465.5 10462.5 10456.0 10453.0 10450.5 10442.5 10422.0 10399.5 10380.5 10375.5 10360.0 10331.0 10308.0 10265.5 10256.5 10245.0 10226.0 10210.0 10204.5 10183.0 10153 5 10115 5 10075 0 10058 0 10050 5 10044 5 10025 5 9998.0 9976.0 9961.0 9947.5 9937.5 9913.5 9897.5 9891.5 9871.0 9851.5 9835.5 9833.0 9828.0 9812 5 9794 0 9743 5 9729 5 9689 5 9675 5 3-JUL-1996 09:19 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 9666.0 9656.5 9636.5 9597.5 9593.5 9584.0 9565.0 9545.5 9532.5 9487.5 9449.0 9428.5 9421.0 9414.5 9392 5 9308 5 9287 5 9274 5 9265 5 9211 0 9173 5 9169.0 9136.0 9014.0 8981.5 8942.5 8902.0 8804.5 8779.5 8771.5 8765.5 8743.0 8729.0 8705.5 8701.5 8675.0 8662.5 8638.5 8626.5 8612.5 8588.5 8577.0 8552.0 8541.5 8512.0 8497.5 8447.5 8376.5 83 67.5 8329.0 8313.5 8264.0 8231.0 8223.0 8184.0 9665.5 9658.5 9639.5 9599.5 9596.0 9586.5 9568.5 9547.5 9534.5 9488.5 9448.5 9429.5 9423.5 9417.5 9397.5 9308.5 9291.0 9278.0 92 68.5 9215.0 9176.5 9170.5 9136.0 9014.0 8984.0 8948.0 8905.5 8804.5 8780.0 8771.5 8765.5 8743.0 873 O. 5 8707.5 8705.0 8677.0 8667.5 8644.0 8633.0 8618.0 8592.0 8580.0 8556.0 8544.5 8513.0 8500.5 8449.0 8379.0 8370.0 8332.0 8314.5 8265.0 823 O. 5 8225.0 8188.0 3-JUL-1996 09:19 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 PAGE: 8170.0 8163.5 8149.0 8126.0 8114.0 8098.0 8092.5 8084.5 7991.0 7966.5 7936.5 7914.5 7864.0 7843.0 7833.5 7813.0 7753.5 7712.5 7375.5 7362.5 7304.5 7284.0 7276.5 7217.0 6908.0 6891.0 6813.0 6721.0 6632.0 6535.5 6504.5 6228.0 6164.0 6073.0 6022.0 5886.5 5814.0 5726.0 5701.5 5606.5 5471.0 5393.0 5322.0 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE $ 8175.0 8172.0 8157.0 8131.5 8119.5 8103.5 8099.0 8087.5 7994.0 7967.5 7939.0 7916.0 7865.5 7847.0 7839.0 7818 5 7751 0 7713 5 7379 5 7365 0 7309 0 7293 0 7282.5 7219.0 6911.0 6892.0 6815.5 6725.0 6632.0 6536.5 6502.5 6233.0 6168.5 6070.5 6024.0 5885.5 5815.5 5733.5 5706.5 5607.0 5469.5 5396.5 5324.0 102.0 BIT RUN NO. MERGE TOP MERGE BASE 1 5252.0 9769.0 1 9769.0 10596.0 2 10596.0 11032.0 REMARKS: The depth adjustments shown above reflect the MWD GR LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 PAGE: to the CBT GR logged by SWS. Ail other MWD curves were carried with the GR. This file also contains the Very Enhanced QRO resisitivity with 2' average that was reprocessed at GeoQuest. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 60 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 17 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 630380 O0 000 O0 0 1 1 1 4 68 0000000000 RA MWD OH~iM 630380 O0 000 O0 0 1 1 1 4 68 0000000000 RP MWD 0Iff4~630380 O0 000 O0 0 1 1 1 4 68 0000000000 VRA ~ffWD OH~4~ 630380 O0 000 O0 0 1 1 1 4 68 0000000000 VRP MWD Ot~Vff4 630380 O0 000 O0 0 1 1 1 4 68 0000000000 DER I4~$D Otff4~ 630380 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 630380 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 630380 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 630380 O0 000 O0 0 1 1 1 4 68 0000000000 RHOBMWD G/C3 630380 O0 000 O0 0 1 1 1 4 68 0000000000 DRHOMWD G/C3 630380 O0 000 O0 0 1 1 1 4 68 0000000000 PEF MWD BN/E 630380 O0 000 O0 0 1 1 1 4 68 0000000000 CALNMWD IN 630380 O0 000 O0 0 1 1 1 4 68 0000000000 NPHIMWD PU-S 630380 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH GRCH GAPI 630380 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 PAGE: ** DATA ** DEPT. 11034.500 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD VRP.MWD -999.250 DER.MWD -999.250 ROP.MWD 22.195 FET.MWD GR.MWD -999.250 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD CALN. MWD -999.250 NPHI.MWD -999.250 GRCH.GRCH -999.250 DEPT. 5250.000 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD VRP.~gWD -999.250 DER.MWD -999.250 ROP.MWD -999.250 FET.MWD GR.MWD -999.250 RHOB.MWD -999.250 DRHO.I~WD -999.250 PEF.MWD CALN.MWD -999.250 NPHI.MWD -999.250 GRCH. GRCH 36.344 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAIVE : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 96/07/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~iE : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE H~ER FILE NUMBER: 2 EDITED~!ERGEDMAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: 0.5000 FILE SUA~4ARY LDWG TOOL CODE $ START DEPTH STOP DEPTH 5252.0 9769.0 10119.0 10357.0 · LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 PAGE: ~IERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: MAD RUNNO. MAD PASS NO. MERGE TOP MERGE BASE 1 1 5252.0 9769.0 2 1 10119.0 10357.0 THIS FILE CONTAINS THE MAD DATA FROM BOTH BIT RUNS. THE INTERVAL FROM 5252' TO 9769' WAS CDR DATA ONLY, WHILE THE INTERVAL FROM 10119' TO 10357' WAS CDN DATA ONLY. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 8 9 11 12 13 14 15 16 0 0.5 FT 18 65 68 65 66 68 66 0 65 FT 66 68 66 1 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 630380 O0 000 O0 0 2 1 1 4 68 0000000000 RA MAD OH~4M 630380 O0 000 O0 0 2 1 i 4 68 0000000000 RP MAD OH~M 630380 O0 000 O0 0 2 1 1 4 68 0000000000 VRA MAD Otff4M630380 O0 000 O0 0 2 1 1 4 68 0000000000 VRP MAD OH~ff~630380 O0 000 O0 0 2 1 1 4 68 0000000000 DER MAD OHMM 630380 O0 000 O0 0 2 1 1 4 68 0000000000 ROP MAD FPHR 630380 O0 000 O0 0 2 1 1 4 68 0000000000 FET MAD HR 630380 O0 000 O0 0 2 1 1 4 68 0000000000 GR MAD GAPI 630380 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) RHOBMAD G/C3 630380 O0 000 O0 0 2 1 1 4 68 0000000000 DRHOMAD G/C3 630380 O0 000 O0 0 2 1 1 4 68 0000000000 PEF MAD BN/E 630380 O0 000 O0 0 2 1 1 4 68 0000000000 CALNMAD IN 630380 O0 000 O0 0 2 1 1 4 68 0000000000 NPHIMAD PU-S 630380 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10356.893 RA.MAD -999.250 RP.MAD -999.250 VRA.MAD VRP.MAD -999.250 DER.MAD -999.250 ROP.MAD 68.181 FET.MAD GR.MAD -999.250 RHOB.MAD -999.250 DRHO.MAD -999.250 PEF.MAD CALN.MAD -999.250 NPHI.MAD -999.250 DEPT. 5255.392 RA.MAD -999.250 RP.MAD -999.250 VRA.MAD VRP.MAD -999.250 DER.MAD -999.250 ROP.MAD -999.250 FET.MAD GR.MAD 35.160 RHOB.MAD -999.250 DRHO.MAD -999.250 PEF.MAD CALN. MAD -999.250 NPHI.MAD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 96/07/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 96/07/ 3 ORIGIN : FLIC TAPE NAME : 96092 CONTINUATION # : 1 PREVIOUS TAPE : COM~JENT : ARCO ALASKA, INC., PT. MCINTYRE P2-53, API# 50-029-22656-00 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-JUL-1996 09:19 PAGE: 10 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 96/07/ 3 ORIGIN : FLIC REEL NA~E : 96092 CONTINUATION # : PREVIOUS REEL : CO~94ENT · ARCO ALASKA, INC. , PT. MCINTYRE P2-53, API # 50-029-22656-00