HomeMy WebLinkAbout196-069Memorandum
State of Alaska
Oil and Gas Conservation Commission
To: Well File: Prudhoe Bay Unit 15-45 Permit # 196-069
August 15,2001
Re:
Administrative Abandonment Action
Prudhoe Bay Unit 15-45 Permit # 196-069
This memo will remain at the front of the subject well file.
Well 15-45 was replaced by 15-45A (permit # 200-068, API# 50-029-22671-01) when the permit was
approved 5/18/2000. The replacement well incorporates an extension to a new bottom hole location
using the existing well bore. This extension, along with the original hole, will be used for production of
hydrocarbons. A review of both well files indicates administrative abandonment of the originating well
bore is appropriate according to current AOGCC procedures for wells where additional permitted
extension is drilled from an existing well bore.
20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data
bases require each conductor has only one permit number and API number. Administrative
abandonment of the original permit only eliminates duplication in the databases. Information for the
original well and its replacement will be maintained in their respective files.
The operator has been notified of this action. All future correspondence with the AOGCC should reflect
the new permit number, API number and well data.
Statistical Technici~~/,~ { ~/~l I(~/Jf.~rvoir Engineer
Petroleum Geologis~~/c~.. ~.~ ~.~_~,/z,.~./~;--'Cor · ·
..ANNULAR INJECTION-
oDATA ENTRY SCREEN
Asset J~.~ ........................................... '
Rig Name J~.<~..1.~...: .......... ~ ...................
Inj Well Name Q~..1.~.-..~5. ..................................
Sur Csg Dep ;~.~.~. ................
Permit Start ......... .4.:.4.:~.§ .......
Legal Desc .~Z.~).'..B;~I~.5.:[~.Q'...~J~JL;,.,.~9.G,.2?.,..T.:LI~,.B.t~ ........................... ,. Research
· ........
UUU U .L. ELL. BF.
Permit End ........ ..4:..4:.~Z .........
Cumulative Data'
Rig. cOmPletion Formation in[~rmittant ' Final
Well Total Mud/Ctg Wash .. :"Fifties... :.. · ': .-i~iuidS'. . ".':-i::~.~:-~:~':~-. , ;.- -:::.-: :.: .~ . ' :. FreeZe' :-
......... .1.,~.~2 ................... 1.,.6.~Z .................... .1.~.4. ....................................................................... ' ............ ,5I .......... :.
Daily .Data
IV~ CtgS, Crnt j j ir~n E.~i Fl'al
DS 1S-45 l~~ ....... ~ ............ ~ 690
DS 15-45 104/2~96 190 190 3 BPM ~ 900 PSI
DS 15-45 ~04/23/96 140 140 4 BPM ~ 1000 PSI
DS 15-45 104/24/96 /170 170 4 BPM ~ 1050 PSI
D~ ~'~:~ ............ "'i'~)~ ........... 1~'~7 ...................... 110 ~ 517 ...... 4 BPM.~ 1050 PSI
~5:~ ........ ~'05/~5~ ...... ] ................ 23.5 " ~ 51 74.5
........................................ ] .......................................... ] ........................................... , ..................... I .................... Flow of 8.6 ppg airy water (chlorides)
8roachod durin~ in]oeUon. Immodiatoly shut do~
~ ' i ....... iniocUon, lotal ~stlmat~d flow back d~
I broaehin~ wa~ 25 bbl or
Comont down squoo~o po~ormod on.
......................................... ......................
~ pumpod 51 bbls {8400 sx) Coldsot II c
,-. ............ iPlu8 50 bbls dio~ol to ~pot comont in p
............ . -
..................................................................................................................................
~ t,~t annulus to 15OO psi 2000 bourn,
5/5/96
....... : ................. 1 .................................... : .....................................................................
rvices
rilling
900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508
(907) 561-5111 Fax: (907) 564-5193
December 14, 1998
Wendy Mahan
Natural Resource Manager
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alt 99501-3192
Re:
Annular Disposal Information Request
Dear Ms. Mahan:'
RECEIVED
DEC 14 1998'
Naska 0il l Gas Cons. Commission,
Anchorage
On October 28, 1998 yoU requested an update'from Shared Service Drilling regarding Annular'
Disposal Records from July 25, 1995 through present time. We compared your list with our
records and are able to provide yOu with the following data:
· ' Individual Annular Disposal Logs from the ssD database which coincide with.the approved.
wells on your attached AOGCC Annular Log. The.SSD records are provided to yOU in the
same' order as listed on your 10g.
· There were some wells on your list which were not injected into. These wells 'are identified
as follows:
· Endicott wells 1.-03/P-16, 1-.65/N-25, 1-59/0-24
· Exploration well Pete's Wicked #1
· Milne Point wells E-22, E-23, F-01, L-16, J-19, L-25, F-30, .L-21, K-38, NMP #1 &
K-05, K-02,1t-07, K-25, K-37, E-17, F-21, K-30, K-34, K,21i~ F-66, K-06, K-54, K-33,
F-49i, K-18
· PBU Wells E-38, 18-34, 15-42, 'S-29A, 15-46, B-36, 15-43, 11-38 '
· The mason many of these annuli were not used is because' the waste materials generated from
these wells were injected into other approved annuli. Hopefully the injection logs submitted
with this letter will clarify this. In addition, please note that our records show: ..
· The wells listed above in italics were permitted but not used for annular disposal.
· The wells listed above in BOLD were not permitted for annular disposal. Wells drilled
after June 6, 1996 were required by SSD procedure to be permitted with a Sundry
Approval (10-403) form. Our records show that no Sundry Approval for Annular
Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996
were automatically approved for annular disposal with the Permit to Drill.
· We also provide .you with a cumulative report from our database of records from July 25,
1995 through the present. FrOm those records, we show. the following wells not listed on.
your report were used for annular disposal:
. CANNED NOV 2002
·
...Annular Disposal Letter
'. 12/14/98
!
· Endicott wells 1-23/O-15, 1-61/Q-20, 2-40/S-22
· Exploration well Sourdomzh #3 - ~,-oo ~ ,~.~ ' .
· Mi~e Point wells F-06, ~-05, H-06, J-13, L-24 - ~ s-~ o
· PBUwells-18-30, 18-31, 14~,~-4~,E-34, E-36, G-~A,~dS-33-~z'~
. . . -oS '33.~ 'q~.oW
· ~d,v, du~ logs ~e prov, Oed to ~6u g~ these ~ogs as we~l.
· Finally, our records show that the B-24 outer annulus was left open (see attached
correspondence)
Thank you for the opportunity to provide clarity to these records. If I can be:of any further
assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental
Advisor at 564-4305. ..
Sincerely,
Fritz P. Gunkel
Shared Service Drilling Manager ,
FPG/KMT
cc: Dave Wallace - HSE Manager (w/out attachments)
RECEIVED
DEC,. !'4
Alaska Oi! & Gas Cons. Commission
Anch0rago
$CANNED NOV 1 2002
I.
Sharcd SerVice Drilling
Ann~ar Injection-Volumes
July 25, 199~ until December 1998
Cumulative Report
Rig · - Inj Well -
Endicott
Doyon 15 1-19/I-18
Doyon 15 1-23/O-15
Doyon .15 1-33/M-23
Surface
Casing .... Cum Mud
Depth Legal Desc Cum Total & Ctgs
. .
5000 Sec. 36, T12N, R16E 8,960 7.848
4246 2020'FNL, 2087'FEW, SEC.36,T12N,R16E 32,084 30,604
...................................
5013 3217'NSL, 2114'WEL. Sec 36,T12N, R16E 9,879 9.729
Cum Rig - Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus
Wash Fluids Fluids Freeze Freeze Start End Slatus
.........
992 120 12/5/95 12/5/96 Open
1,160 200 120 9130/95 12/31/95 Open
150 8/31/95 12/31/95 Broached
Doyon 15 1-61/Q-20 4236 3075'NSL~ 2207"WEL, Sec 13,T12N, R16E 25,228 21,379
............
Doyon' 15 2-40/S-22 ' 4531 2020'FNL. 2289'FEL. Sec 36,T12N. R16E 31,195 29,952
EoA
1,063 120 60 7/25/95 12/31/95 Open
·
Doyon 14 15-47 3515 3648'NSL, 4956'WEL, Sec 22,T11N. R14E 3,002 903 2,009 90 11/7/95 12/31/95 Open
~)oyon 14 DS 15-45 3829 4749' NSL, 5180' WEL. Sec. 22. T11 N, 1,882 1,697 134
51 4/4/96 4/4/97 Broached
~)oyon 14 DS 15-48 3548
~oyon 14 DS 15-49 3667
Sec. 22, T11N, R14E
.......
4676' NSL, 5165' WEL. Sec. 22, TllN,
3,385- 216 820 2.283 66 12/21/95 12/21/96 Open
Open
4,669 1,559 1,141 1,904 65 2/21/96 2/21/97
~oyon 9 18-30 3930 1499'SNL, 26'WEL. Sec 24,T11N. R14E 2,266 936 380 800 150 7/25/95 12/31/95 Open
)oyon 9 18-31 3680 3719'NSL. 64'WEL, Sec 24.T11N. R14E 6,086 2,250 1,100 2.565 171 7126/95 12/31/95 Open
)oyon 9 18-32 3830 3632'NSL, 41'WEL, Sec 24,T11N, R14E 3,311 1,861 200 1,100 150 8/24/95 12/31/95 Open
.
)oyon 9 18-33 4140 3690'NSL,.56'WEL, Sec 24,T11N, R14E 5,215 2,050 3,035 10 120 9/28/95 12/31/95 Open
__
Jabots 18E 12-35 3543 348'NSL, 705~NEL, Sec 18,T10N, R14E 3,723 3,436 137 150 9/1/95 12/31/95 Open
labors 18E 12-36 3452 63'FSL, 899'FEL, Sec 18.T10N, R15E 4,002 1,961 50 1,871 120 10113/95 12/31/95 Open
labors 18E 13-36 3431 1585'NSL, 5187~NEL, Sec 13,T10N. R14E 4,137 3,523 464 150 10/26/95 12/31/95 Open
labors 18E 14-44 3288 2829'NSL, 1617'WEL, Sec 9,T10N, R14E 3,974 2,319 1,535 120 8117/95 12/31/95 Open
xploration ' '
ool 4 Sourdough #3 4236 2245'FSL, 5067' FEL, Sec. 29, TgN. R24E 5,786 4,630 1,156 1/26/96 1/26/97 Closed
Iilne
27E MPK-17 3508 3648'NSL,2100~NEL, Sec.03,T12NRllE 19,608 18,538 285 685 !00 4/18/96 4118/97 Open
abors 22E MPC-23 4941 1038 NSL. 2404 WEL, Sec 10,T13N, 2,060 1,800 130 130 1/25/96 1/25/97 Open
abors 22E MPC-25 8595 1143'FNL, 2436'FWL, Sec 10,T13N, R10E 1,905 1,465 .. 300 140 1/5/96 1/5/97 Open
abors 22E MPC-26 - 4704 1086 NSL, 2419 WEL. Sec 10,T13N, 5,228 4,483 555 190 12/19/95 12/19/96 Open
abors 22E. MPC-28 5405 Sec 10,T13N, R10E 425 350 ' ' 75 2/15/96 2/15/97 Open
.
Page I
Shar~.d Service Drilling
Annul'ar Injection Volumes
July 25, 199~ until December 1998
Cumulative Report
Rig Inj Well
Nabors 22E MPF-06
Nabors 22E MPF-14
.......
Nabors 22E MPF-70
Nabors 22E MpH-05 '
Surface
Casing
Depth
8766
.....
Cum Mud Cum Rig Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus
Lega! Desc Cum Total. & Ctgs Wash_ Fluids . Fluids Freeze ..... I~reeze Slarl End Stalus
Sec 06,T13N. R10E 1,927 1,731 _ 196 1/25/96 1/25/97 Open
.~.
.. .......
6690 .... s,?.'_o.~.._~l~.,. RlOE_.U.M.~ ..... . .............. 1_~,?_ ..... !.T..I_? ......... .?7o_ ......................... . 340 6/3/96 6/8/97 Open
7919 2189'NSL, 2591'WEL, Sec 6,T13N. R10E 19,775 18,794 735 '- lg0 56 6/17/96 6117/97 Open
5335 2882'NSL, 4028'WEL, Sec 34.T13N, R10E 8,283 7,711 .- 382 190 8/19/95 12/31195 Open
Nebors 22E MPH-06 7304 2824~NSL, 4044'WEL. Sec 34.T13N, R10E 8,515 - 8,335 180 8/'5/95 12/31/95 Open
Nabom 22E MPI-07 2680 2339'NSL. 3g06'WEL, Sec 33.T13N, R10E 1,680 1,280 250 80 ' 70 9/21/95 12/31195 Open
Nabors 22E MPJ-13 2835 2319'NSL. 3179'WEL, Sec 28,T13N, R10E 14,127 ' 13,292 645' 60 130 10117/95 12/31/95 Open
. Nabors 22E MPJ-16 3112 2317'NSL, 3336'WEL, Sec 28,T13N, R10E 985 915 70 11/12/95 12/31/95 Open
Nabors 27E B-24 4080 SeC 18,T13N, R11E UM 1,468 1,396 72 - 1/25/96 1/25/97 Open
Nabors 27E MPF-22 8841
. .
Sec 06.T13N, R10E UM 6,536 6,466 70 12/12/95 12/12/96 Open
12/26/96
Nabora 27E MPF-25 3405 1857'NSL. 2696'WE1., sec 6,T13N. R10E ' 9,897 9,357 250 225 65 12/26/95 Open
Nabors 27E - MPF-37 6621 1931'NSL. 2643'WEL, Sec 6,T13N, R10E 7,032 - 6,887 ' _ 70 75 7/25/95 12/31/95 Open
Nabors 27E MPF-38 8561 1994'NSL, 2731~NEL Sec 6,T13N, R10E 9,232 9,157 75 12/6/95 12/31/95 Open
Nabors 27E MPF-45 6678 - 1979'NSL, 2608'WEL, Sec 6,T13N,'R10E 17,562 17,381- 181 7/31/95 12/31/95 · Open
Nabors 27E MPF-53 6750 2028'NSL, 2572'WEL, Sec 6,T13N, R10E 6,051 5,671 165 75 60 80 8/19/95 12/31/95 Open
Nabors 27E MPF,61 6585 2077'NSL~ 526'WEL~ Sec 31,T14N, R10E 5,732 5,657 75 8/31195 12/31/95 Open
Nabors 27E MPF-62 6059 2141'NSL, 2627'WEL, Sec 6,T13N, R10E 386 316 70 10/13/95 12/31/95 Open
Nabors 27E MPF-69 5772 2125'NSL, 2502'WEL, Sec 6,T13N, R10E 9,740 9~665 75 8/31/95 12/31/95 Open
Nabors 27E MPF-78 7085 2237'NSL, 2555'WEL, Sec 6,T13N, R10E 8,476 7,456 40- 775 65 140 9/12/95 12/31/95 Open
Nabors 27E MPL-24 '- 6515 3654'NSL, 5180'WEL, Sec 8,T13N, R10E 6,790 4,900 ' 1,320 165 335 70 11/27/95 12/31/95 Open
WOA
18E F-33 3570 3332'NS1~, 2174'WEL, Sec 2,TllN, R13E 1,468 183' 660 465 160 2/21/96 2/21/97 Open
F-36 3691 2642'NSL, 2878'WEL, Sec 2,T11N, R13E 6,963 1,998 ~1,359 3,471 135 12/18/95 12/18/96 Open
18E .
....
~oY0n 9
D-30 3456' 3625' NSL, 1066' WEL, SEC. 23, T-11N~ ' 5,261 2,811 1,275 1~035 140 1131196 1/31197 Open
.
30yon 9 D-31 32i5 SEC. 26, T11N, R13E 150 150 4120/96. 4110/97 Open
30YOn 9 D-33 3222 2965' NSL. 1067' WEI~, SEC. 23,-T11N, ' 4,661 2,425 2,106 130 2/21/96 2/21/97 open
~labors 18E S-43 . 3121' 4211'NSL,4503'WEL,SEC35,T12N,R12E 5,943 2,636 1,716 1,511 80 5/7/97 - 5/7/98 OPEN
Page 2-
Shared Se~ice Drilling
Ann~ih'r injection Volumes
July 25, 1995, until December 1998
- Cumulative Report
Surface
Casing ' '
Rig Inj Well Depth
.
Nabors 28E B-33 3504'
........
Nabors 28E E-34 3664
. .
Nabors 28E E-36 3648
._.
Nabors 28E E-37 3810
Cum Mud Cum Rig Cum Compl Cum Form Cum Interm Cum Final
Legal Desc Cum Total & Ctgs Wash Fluids Fluids Freeze Freeze
969'SNL. 1898'EWL, Sec 31, T11N. R14E 3,974 2.842 857- 195 80
168'SNL, 500'WEL, Sec 6, T11N. R14E 9,656 7,228 1,420 858 40 110
· 1706'SNL. 822'WEL, Sec 6,T1 ! N, R 14E 9,271 4,417 1,293 3,096 ' 365 100
3391'NSL, 881'WEL, Sec 6,T11N, R14E 4,695 4,241 374 80
Disposal Period Annulus
Sta~t End Slalus
5/1/96 12/31/96 Broached
......
8/23/95 12/31/95 Open
.........
7/25/95 12/31/95 Open
. .
9/16195 12/31/95 Open
Nabors 28E E:.39 . 3638 . 335~.'_NS_L,' $_o.!'.W_E.L,..s.e__c S;T~!_.N.'._R.I_4._E. 2,250
Nabors 28E G-04A 3509 2917'NSL, 1974'WEL, Sec 12,T11N, R13E 5,937
Nabors 28E G-21 3509 2911'NSL, 2368'WEL, Sec 12,T11N, R14E 11,430
Nabors 28E S-24 2750 1633'SNL, 4228'WEL, Sec 35,T12N. R12E 20.261
Nabors 28E S-33 2958 1639'SNL, 1487'WEL, Sec 35.T12N, .R12E 18,014
928 ' 220 1,022
1,798 1,824 2,315
.......
3~956 3,072 - 4,270
11.773 2,i 77 5,751
6,613 2,431 8,392
80 8/28/95 12/31/95 Open
........ · ................................
10/20195 12/31/95 Open
70 ' 62 9/8/95 12/31/95 Open
275 285 12/9/95 12/9/96 Open
270 308 1 2/1/95 12/1/96 Open
Nabors 28E S-41 3331 4152~ NSL, 4504' WEL, Sec 35,T12N, 8,062 4,159 2,034 1,754.
Nabors 28E S-42 3077' Sec 35, T12N, R12E 1'68 100
115 2/8/96 2/8/97 Open
68 3/1 3/96 3/1 3/97 Open
Nabors 2ES H-35 3157 4535'NSL, 1266'WEL, Sec 21,T11N, R13E 4,860 3,725 555 480
20 80 10/26/95 12/31/95 Open
Nabors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21,TllN, R13E 1,452 857 100 410
85 10/26/95 12/31/95 Open
Page 3
h sred
..e. ry. ices
rJ..IJJng
TO: Blair Wondzell
FROM: Chris West
DATE: October 27, 1995
SUBJECT: '
MPB-24 Well Suspension
APl # 50-029-22642
Blair;
Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- '
AAC 25.110. As discussed this morning we. propose setting three plugs in this well as detailed in the
attached form. 'This will allow us to retain the wellbore for potential future sidetrack or service well
use.
We would, like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid Wastes. There
are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection
as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the.
rig.
.Thank you for your help in this matter. Please call me if I may be of any. assistance.
Chris West
Drilling. Operations Engineer
NaborS 27E
(907)-564-5089
GaS rj3r~. ~,~,, .....
PERMIT
DATA
AOGCC Individual Well
Geological Materials Inventory
T DATA PLUS
Page: 1
Date: 05/13/98
RUN DATE RECVD
--
96-069 DLL/GR
96-069 CN
96-069 DAC/GR
96-069 CN/ZDL/GR
96-069 SSVD
96-069 BHP
96-069 7457
96-069 GR/PDC
96-069 7468
96-069 7469
96-069 PDK/GR/CCL
~SEPIA
~EPIA
~SEPIA
~L'~SEPIA
~5/~EPIA
~I[-SEPIA
r/ATLAS
~5000-9880
~,5,10-13 RES/GR
DLL/DAC/ZDL/CN/GR
1 05/03/96
1 05/03/96
1 05/03/96
1 05/03/96
1 05/03/96
1 05/03/96
1 09/10/96
FINAL 09/20/96
10/09/96
4-8 10/09/96
1 05/15/97
10-407 ~~COMPLETION DATE ~7 ~/~6/
DAILY WELL OPS R ~/ ~ / 46/ TO t7 3~/ ~/
Are dry ditch samples required? yes n~_~.And received?
Was the well cored? yes ~_~iAnalysis & description received?
Are well tests required?ll!~yes ~-~Recemved?
Well is in compliance
I~tial
COMMENTS
ye s
..-=~.. STATE OF ALASKA ~
/~ ;A OIL AND GAS CONSERVATION COMMISSIOK
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation Shutdown _ Stimulate._ Plugging _ Perforate _
Pull tubing _ Alter casing _ Repair well _ Other _X
2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet):
ARCO Alaska, Inc. Development~X 34' RKB
3. Address: Exploratop/_ 7. Unit or Property:
P.O. Box 100360 Stratagrapic_
Anchorage, AK 99510-0360 Se~,ice_ Prudhoe Bay Unit
4. Location of well at surface: 8. Well number:
4749' NSL, 5180' WEL, Sec 22, Tll N, R14E, UM. 15-45
At top of productive interval: 9. Permit number/approval number:
2984' NSL, 1184' WEL, Sec 16, T11N, R14E, UM. 96-69
At effective depth: 10. APl number:
50-029-22671
At total depth: 11. Field/Pool:
3741' NSL, 2108' WEL, Sec 16, T11N, R14E, UM. Prudhoe Bay Oil Pool
12. Present well condition summary
Total Depth: measured 11060 feet Plugs (measured) CIBP at 10540' MD (set 10/14/97).
true vertical 8784 feet
Effective Depth: measured 10540 feet Junk (measured)
true vedical 8788 feet
Casing Length Size Cemented Measured depth True vertical depth
Conductor 110' 20" 260 Sx Arcticset 110' 110'
Surface 3795' 9-5/8" 1085 Sx CS III, 3829' 3554'
305 Sx Class G &
200 Sx CS Il
Liner 9226' 7" 230 Sx Class G 9258' 8286'
Liner 1970' 4-1/2" 220 Sx Class G 11060' 8784'
Perforation Depth measured 9880- 10080'; 10110- 10510'; [Isolated below CIBP: 10560- 10770'; 10820- 10890']
true vertical 8786- 8786'; 8785 - 8783'; [Isolated below CIBP: 8782- 8776'; 8775- 8775']
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, Tbg @ 9091' MD.
Packers and SSSV (type and measured depth) Baker S-3 Packer @ 9056' MD;
HES HXO SLVN SSSV @ 2184' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured, see attached ORIGINAL
Intervals treated (measured)
14. Representitive Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 1950 40490 0 923
Subsequent to operation 1876 33107 0 956
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run _
Daily Report of Well Operations _X Oil _X Gas _ Suspended Service _
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed "~~ "~ , ~ll,/~----'Orf ¢1"~ ~,~ Title: Engineering Supervisor Date
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE~~
15-45
DESCRIPTION OF WORK COMPLETED
CAST IRON BRIDGE PLUG INSTALLATION FOR GAS SHUTOFF
10/13/97:
MIRU CTU & PT equipment. Loaded the wellbore w/1% KCl Water & Crude, then RIH w/a K-1 ClBP &
set the plug at 10540' MD in the 4-1/2" liner, to isolate the two lower open perforation intervals located at:
10560- 10770' MD (Zl)
10820- 10890' MD (Zl)
POOH. Rigged down.
Returned the well to production & obtained a valid welltest.
Stat( Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Transmittal of Final Prints. Please sign and return copy to:
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
12-May-97
Well Name
Services !Bluelines
ISepia
Film
DS 15-45 PDK/GR/CCL (BORAX) I 1 1 0
i.
Received by: 0
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
ANNULAR INJECTION
DATA ENTRY SCREEN
A s s e t .EQ& ........................................... Legal Desc ..4.7..4.9.'...bI,SJ.,..5.~.~.0.'...WEL..Se.c,..22,...'~.l.l.~,..B.l..4.E ...............
Rig Name .DQyQp...1.4.. ............................... · ......................................................................................................................
Inj Well Name .D,S....1.5.~..45 .............................. Permit Start ....... .& .~ . .4. r. ,9 .6 ....... Permit End ....... .~.=..4.r.9.7.. .......
Sur Csg Dep .3.8.2.9. .............. · .............................................................
Cumulative Data
Daily Data
DS 15-45 04/19/96 100 100
DS 15-45 04/20/96 690 690
DS 15-45 04/22/96 190 190
DS 15-45 04/23/96 140 140
DS 15-45 04/24/96 170 170
DS 15-45 04/25/96 407 110 517
DS 15-45 05/05/96 23.5 51 74.5
3 BPM @ 900 PSI
4 BPM @ 1000 PSI
4 BPM @ 1050 PSI
4 BPM @ 1050 PSI
Broached
Flow of 8.6 ppg dirty water (chlorides)
at 11000 mg/1) observed at 0900
du.r.ing_i_~Le..ct!on. Immediatel~ shut down
i n_j..e_c t i..o.....n..:.._.T_o...t_a/....._e_st!_m_a..t e d.. f[..o_.w_ _.b.....a_c_.k.........d...u...r..!...n...g
broaching was 25 bbl or less.
Cement down squeeze performed on 7" x
9 5/8" annulus on 5/5/96, witnessed by
Bobby F_oster with the AOGCC. Mixed and
.P__u_m.P_9 d 51..__b_b.I s__(34___0_0_ s_~ C o I d__.se_~t_ I/....~.e_.~..e_0..t.. ......
at 14.9 ppg, followed by 23.5 bbls water
plus 50 bbls diesel to spot cement in place
and for FP. Rate during job 4.5 bpm at 750
psi. CIP at 0030 hrs on 5/5/96. Pressure
__ test annulus to 1500 psi 2000 hours,
5/5/96
ANNULAR INJECTION
DATA ENTRY SCREEN
Asset .EOA ........................................... Legal Desc ..4~i2'.§:...blSL..5.~.~5:...~JEL,...S~c...22,...'[.L1.bI...B,1..4.E ...............
Rig Name ,B~r~,.1..~ ............................... · ......................................................................................................................
Inj Well Name .D$,.,.1.~5=..49. .............................. Permit Start ..... 2..-.2.L=.9.~ ..... Permit End ..... 2_.-.2.;L.t.9.Z .....
Sur Csg Dep .3.6.~Z .............. · .............................................................
Cumulative Data
Daily Data
DS 15-49 03/24/96 383 383
DS 15-49 03/25/96 80 80
DS 15-49 03/26/96 272 272
DS 15-49 03/30/96 60 50 11 0 3.5 BBL @ 800 PSI
DS 15-49 03/31/96 118 10 128 4 BBL @ 800 PSI
DS 15-49 04/02/96 100 20 120 4 BBL @ 800 PSI
DS 15-49 04/03/96 141 160 301 4BBL @ 800 PSI; 5% CMT RNSATE
DS 15-49 04/04/96 375 130 1,091 1,596 4 BBL @ 900 PSI; S'H20 DISPLACEMENT
DS 15-49 04/05/96 119 33 152 4 BBL @ 900 PSI
DS 15-49 04/06/96 179 179 4.5 BBL @ 950 PSI
..D...,S,,..._!,._5_-.4_9.. ..... .04./.0__7/9.§ ............................................................ --7_80 ..................................................................... __780 ....... 4 BBL @ 900 PSI; I NJCT_D_ P___I_T.S_:_E..N.D_W_W_E_.I~_I~ ..............
DS 15-45 04/1 1/96 30 473 65 568 4.5 BBL @ 950 PSI; 5% OF 200 BBLS CMT
Open
,
h _
I
[ _
q~ALASKA~
eared
rvices
rilling
BP Exploration / Arco
To: Alaska Oil & Gas Conservation Commission Date: October 29, 1996
From:
Subject:
Terrie Hubble X0~
Technical Assistant
Annular Injection for Permit #96-69, 15-45
Please find attached a revised Annular Injection Summary (two pages) for the
above mentioned well. After I submitted the 10-407, the Summary was updated
without my knowledge. I have recently completed an audit of the annular
injection records for the first six months of the year for PBU and this is the only
record that was submitted incomplete. Please accept my apologies for this
oversight.
Thank you.
/tlh
RECEIVED
OCT 3 1 1996
Oil & ~s Oo!'~s. C0rrtrn~sslori
0 I::t I I_1_1N G
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn: Howard Okland
3001 Porcupine Dr.
Anchorage, Alaska 99501
October 3, 1996
MWD Formation Evaluation Tapes- DS 15-45 & 15-45 PB 1
_ The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention off
Jan Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
2 LDWG formatted magnetic tapes with LIS listing.
API#: 50-029-22671-00 & 50-029-22671-70 respectively.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Comaanv
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
A'I-rN: Sherrie
NO. 10392
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
9/13/96
Field: Prudhoe Bay
Anadrill Anadrill Anadrill Floppy
Well Job # Log Description Date BL RF Sepia Survey Program Performance Disk
Calculation Letter
D.S. 1-6A PRODUCTION PROFILE 9 6 0 7 31 I 1
...........
D.S. 3-28 CNTG 96081 9 I 1
,,
D.S. 4-3 CNTG 960821 I 1
.........
D.S. 5-01 B GR-CCL TIE IN LOG 9 6 0 81 1 I 1
~D.S. 7-7A PRODUCTION PROFILE 9 6 0 8 0 4 I 1
D.S. 7-7A CNTD 9 6 0 8 0 4 I 1
,,
D.S. 9-2 PRODUCTION PROFILE 9 6 0 80 3 I 1
D.S. 09-07 PRODUCTION PROFILE 9 6 0 81 5 I 1
,.,
D.S. 9-13 PRODUCTION PROFILE 9 6 0 81 2 1 1
, . ,
D.S. 9-29 PRODUCTION PROFILE 9 6 0 8 0 3 1 1
D.S. 15-43 GR/PDC LOG 960817 I 1
D.S. 15-45 GR/PDC LOG 9 6 0 81 8 I 1
,.
D.S. 15-46 GPJPDC LOG 9 6 0 81 8 1 1
....
SEF 2 0
·
SIGNED: ~ DATE:
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
HOWARD OKLAND
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 10 September 1996
RE: Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION
i LDWG TAPE+LIS
1 LDWG TAPE+LIS
1 LDWG TAPE+LIS
ECC No.
Run # 1 6642.00
Run # 1 6666.00
Run # 1 6676.00
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: Date:
Gas Cons. CommOn
STATE OF ALASKA
ALASK~ OIL AND GAS CONSERVATION CL,,,/~MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 96-69 96-096
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22671
4. Location of well at surface ?i~.,~...¥~::.~%1.~ 9. Unit or Lease Name
4749' NSL, 5180' WEL, SEC. 22, Tll N, R14E~, .... ,~1:~:~.~_~:f ~u'! i,";~ ' ]~t Prudhoe Bay Unit
At top of Productive interval "z- ' '* ' ~ I~
2984' NSL, 1184'WEL, SEC. 16, TllN, R14~"'~'~/'~-~} ' ~X!,,l. 10. Well Number
At total depth i ~Z; ~ ! 5-~,:~;.~..-~! 15-45
3741'NSL, 2108'WEL, SEC. 16, TllN, R14~,~¥~,~.-:':::.__~:::::"~ ;~;,(~~:' ll. Field and Pool
......... ~.r ..... ' Prudhoe Bay Field/Prudhoe Bay
i5. Elevation in feet (indicate KB, DF, etc.) 16.' Lease Designation and Serial No. Pool
KBE -- 68.06'I ADL 028306
12. Date Spudded04/08/96 113' DateT'D' Reached 114' DateC°mp"Susp"°rAband'115.Waterdepth' if °fIsh°re 16' N°' °f C°mpleti°ns04/29/96 ' 05/04/96 N/A MSL One
17. Total Depth (MD+-I-VD) 118. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafrosl
11060 8784' F~ 10973 8778 FTI I~Yes ~Uo I 2184' MD/ 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, DIL, AC, GR, ZDL, CN, LWD: DIR/FE/DD,
23. CASING, LINER AND CEMENTING RECORD
CASING SE'i-rING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.)
9-5/8" 47# N-80 34' 3829' 12-1/4" 1085 sx CS III, 305 sx 'G', 200 sx CS II
7" 26# L-80 32' 9258' 8-1/2" 230 sx Class 'G'
4-1/2" 6" L-80 9090' 11060' 6" 220 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD
and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-3/4" Gun Diameter, 4 spf 4-1/2" 9091' 9056'
MD TVD MD TVD
9880' - 10080' 8786' - 8786'
10110' - 10510' 8786' - 8783' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10560' - 10770' 8782' - 8777'
10820'- 10890' 8776' - 8775' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 70 Bbls Diesel
27. PRODUCTION TEST
iDate First Production IMethod of Operation (Flowing, gas lift, etc.)
May 15, 1996 I Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-DEL CHOKE SiZE I GAS-OIL RATIO
TEST PERIOD I~
I
iFIow Tubing Casing PressureCALCULATED ~ OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
REC[IV ED
A~l¢" 011 & O3s Cons. Commission
Al~.chc:'ag0
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Mark~. 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Mariner Name
Depth Depth and gravity, GOR, and time of each phase.
Sag River 9183' 8216'
Shublik 9224' 8255'
Top of Sadlerochit 9284' 8312'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys, Annular Pumping Report
32. I hereby certify that t/l~'"'~rego~,,~/~ tru/e///and correct to the best of my knowledge
Signed
Da. Stoltz Title Senior Drilling Engineer Date
Prepared By Name/Number Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
p..ECE V D
JUl. t996
Form 10-407 Rev. 07-01-80
I I I_ I I I I I
¢i~'~;"~;'~'~;i"~'""'~ ~' '"'~'"~4""~'='~'"' '~ Legal Desc
~Sec, T, R)
Su~ Csg Dep 3829
--.
Well Cum Total ~~?~?~?~?~ Cum Mud/Ctg=~~ ~ Cum Brine ~ ~ ~ Cum Water ~~ ~ Cum Dies/FP ~?~ ~ ~
VOLUME (BBLS Method of displosal=pumpin~ down outer annulus
SOURCE WELL DATE OF DIESE~ FREEZE
MUD/CTGS BRINE WATER Daily Cum. Total COMPLICATIONS, COMMENTS
NUMBER INJEC~ON PROT.
1 5-45 4 / 1 9/96 100
1 5-45 4/20 / 96 690
1 5-45 4/22/96 1 90 ~ ¢~'~ ~ ~::~:'~"~""~ ¢":~'~'"~; I
:,:~:~:~:=¢:.~ ~:~ ~:~ ~:~:..~:~;~:~:,~;~:.~:: 3 BPM ~ 900 PS
1 5-45 4/2 3 / 9 6 1 40 ~ ~:~ ~' ~ ~ ~[~ 4 BPM ~ 1000 PSI -
15-45 4/24/96 170 - ~.~ ~:~ :.~~~~ -- --
15-45 4/25/96 407.00 110.00 ~ ~:~ ~;~ ~:~;~ 4 BPM ~ 1050 PSI
~:~¢~: ~¢ ~ ~ ~ ~;:~ ( Flow of 8.6 ~g di~y water (chlorides at
.... :~:~ :.::?;;:~;~.~;:~:~;~?:~::~;~~1)observed at 0900, 04/25/96
~:~:~: ~::~ ~ ;~:~ ~ ~:::: :~ ;: :; ~.~; ;; ~:~:~:: during injection. Immediately shut down
DO NOT INJECT ANY MORE FLUID IN THIS ANNULUS!!! ~:; :;~:.~ ( ;~ ~;:::;~ection. Total estimated flow back during
WELL BROACHED TO SURFACE! br~~
1 5-45 5 / 5 / 9 6
-- _ down squeeze pedormed on 7"x 9-5/8"
::,:~:L::; :: :~ 0;~O:0; annulus on May 5, 1996, witnessed by Bobb~
~ _ ........ Foster with the AOGCC. Mixed and pumped 51
I
~ I === ====== ======== === =;=0= bbls (300 EX)Coldset II cement at 14.9 p~g,
_ ~ ~ by 23.5 bbls water Bl~s 50 bbls diesel
~ I -~ :~: .:::;~.:: : ~O,00~to spot cement in place and for FP. Ratedurin~
~ ~_ [ ~ 4.5 bpm at 750 psi. CIP at 0030 hrs on
[ I~ ~ ~ :: May 5, 1996. Pressure test annulus to 1500
~ i ~ / 2000 hours, 05/05/96~--
SUMMARY OF DALLY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
Well Name: I 5-45 Rig Name: Doyon 14 AFE: 4J0309
Accept Date: 04/07/96 Spud Date: 04/08/96 Release Date: 05104/96
Apr 8 1996(1 )
Rig moved 100 %.
safety meeting. Tested Divertor.
Apr 9 1996 (2
Drilled to 860 ft.
Apr 10 1996 (3)
Rigged up Divertor. Rigged up Kelly. Made up BHA no. 1 . Held
)
Drilled to 1800 ft.
Drilled to 200 ft.
Drilled to 2020 ft. Circulated at 2020 ft. Pulled out of hole to 1841 ft. R.I.H. to 2020 ft.
Drilled to 2951 ft. Circulated at 2951 ft. Pulled out of hole to 1895 ft. R.I.H. to 2951 ft.
Drilled to 3848 ft. Circulated at 3848 ft.
Apr 11 1996 (4)
Pulled out of hole to 1020 ft. R.I.H. to 3848 ft. Circulated at 3848 ft. Pulled BHA. Ran
Casing to 3829 ft (9.625 in OD). Circulated at 3829 ft. Mixed and pumped slurry - 444
bbl.
Apr 12 1996 (5)
Mixed and pumped slurry- 150 bbl. Rigged down Divertor. Installed Wellhead
integral components. Rigged up BOP stack. Tested Well control. Installed
Wellhead integral components. Made up BHA no. 2. R.I.H. to 1180 ft. Serviced
Block line. R.I.H. to 3744 ft. Circulated at 3744 ft. Tested Casing - Via string.
Apr 13 1996 (6)
Drilled installed equipment - Float collar. Circulated at 3858 ft. Drilled to 4884 ft.
Circulated at 4884 ft. Pulled out of hole to 3820 ft. R.I.H. to 4884 ft. Drilled to 5447 ft.
Circulated at 5447 ft. Pulled out of hole to 4697 ft. R.I.H. to 5447 ft. Drilled to 5447 ft.
Apr 14 1996 (7)
Drilled to 6068 ft. Circulated at 6068 ft. Pulled out of hole to 0 ft. Made up BHA no.
3. R.I.H. to 6068 ft. Drilled to 6483 ft.
0il & G.:.~:; 0¢ns. L;0h~T~ISSi0F~
Ar~ch,~r~g~
Operations Summary for: , 45
Apr 15 1996 (8)
Drilled to 7542 ft. Circulated at 7542 ft. Pulled out of hole to 6033 ft. R.I.H. to 7542 ft.
Drilled to 7759 ft.
Apr 16 1996 (9)
Drilled to 8536 ft. Circulated at 8536 ft. Pulled out of hole to 7405 ft. R.I.H. to 8536 ft.
Drilled to 8955 ft.
Apr 17 1996 (10)
Drilled to 9265 ft. Circulated at 9265 ft. Pulled out of hole to 6000 ft. R.I.H. to 9265
ft. Circulated at 9265 ft. Pulled out of hole to 6400 ft. Laid down 8100 ft of 5 in OD drill
pipe. Pulled BHA. Removed Wear bushing. Rigged up Casing handling
equipment. Held safety meeting. Ran Casing to 200 ft (7 in OD).
Apr 18 1996 (11)
Ran Casing to 3820 ft (7 in OD). Circulated at 3820 ft. Ran Casing to 9257 ft (7 in
OD). Circulated at 9257 ft. Mixed and pumped slurry - 46 bbl. Wait on cement.
Apr 19 1996 (12)
Wait on cement. Installed Seal assembly. Rigged up All rams. Tested All rams.
Installed Wear bushing. Made up BHA no. 4. R.I.H. to 4182 ft. Serviced Block line.
Held drill (Stripping). R.I.H. to 9094 ft. Drilled cement to 9094 ft. Tested Casing - Via
annulus and string.
Apr 20 1996 (13)
Drilled installed equipment - Float collar. Circulated at 9271 ft. Circulated at 9271 ft.
Drilled to 9535 ft. Circulated at 9535 ft. Pulled BHA. Made up BHA no. 5. R.I.H. to
5000 ft.
Apr 21 1996 (14 )
R.I.H. to 8900 ft. Serviced Block line. R.I.H. to 9535 ft. Drilled to 9935 ft. Circulated
at 9935 ft. Pulled BHA. Made up BHA no. 6.
Apr 22 1996 (15 )
R.I.H. to 9935 ft. Drilled to 10191 ft. Circulated at 10191 ft. Pulled out of hole to 9250
ft. R.I.H. to 10191 ft. Circulated at 10191 ft. Pulled out of hole to 9250 ft. R.I.H. to
10191 ft. Circulated at 10191 ft. Pulled BHA. Ran electric logs.
Page 2
jUL. 0'2 '~'°'"
Operations Summary for: , 45
Apr 23 1996 (16)
Ran electric logs. Made up BHA no. 7 . R.I.H. to 7550 ft. R.I.H. to 10191 ft. Drilled
to 10232 ft.
Apr 24 1996 (17)
Drilled to 10366 ft. Circulated at 10366 ft. Pulled BHA. Made up BHA no. 8. R.I.H. to
10366 ft. Drilled to 10482 ft.
Apr 25 1996 (18)
Drilled to 10702 ft. Circulated at 10702 ft. Pulled out of hole to 225 ft. Pulled BHA.
Ran Drillpipe in stands to 10702 ft. Circulated at 10702 ft. Held safety meeting. Mixed
and pumped slurry - 55 bbl. Pulled Drillpipe in stands to 9300 ft. Circulated at 9300
ft. Pulled Drillpipe in stands to 5000 ft.
Apr 26 1996 (19)
Pulled Drillpipe in stands to 0 ft. Retrieved Wear bushing. Tested BOP stack.
Installed Wear bushing. Made up BHA no. 9. R.I.H. to 9233 ft. Serviced Block line.
R.I.H. to 9300 ft. Drilled cement to 9403 ft. Circulated at 9403 ft. Pulled out of hole to
9233 ft. Held safety meeting. R.I.H. to 9403 ft. Drilled cement to 9450 ft.
Circulated at 9450 ft. Pulled out of hole to 900 ft.
Apr 27 1996 (1)
Pulled BHA. Made up BHA no. 2. R.I.H. to 9450 ft. Drilled cement to 9515 ft.
Drilled to 9620 ft. Circulated at 9620 ft. Drilled to 9811 ft. Circulated at 9811 ft. Pulled
out of hole to 200 ft. Pulled BHA. Made up BHA no. 3. R.I.H. to 9000 ft.
Apr 28 1996 (2)
R.I.H. to 9811 ft. Drilled to 9918 ft. Circulated at 9918 ft. Pulled out of hole to 200 ft.
Pulled BHA. Made up BHA no. 4. R.I.H. to 9233 ft. Serviced Block line. R.I.H. to
9918 ft. Drilled to 10382 ft.
Apr 29 1996 (3)
Drilled to 10732 ft. Circulated at 10732 ft. Pulled out of hole to 200 ft. Pulled BHA.
Made up BHA no. 5. R.I.H. to 9937 ft. Logged hole with LWD: DIR/FE/DD from 9937 ft
to 10477 ft. Logged hole with LWD: DIFFFE from 10477 ftto 10732 ft. Drilled to
1 O774 ft.
Page 3
JUL 0 2 i995
Operations Summary for: , 45
Apr 30 1996 (4)
Drilled to 11060 ft. Circulated at 11060 ft. Pulled out of hole to 9233 ft. R.I.H. to 11060
ft. Circulated at 11060 ft. Pulled out of hole to 116 ft. Pulled BHA. Made up BHA no.
6. R.I.H. to 6000 ft.
May I 1996 (5)
R.I.H. to 7000 ft. Serviced Block line. R.I.H. to 9540 ft. Reamed to 10605 ft.
Circulated at 10605 ft. Reamed to 11060 ft. Circulated at 11060 ft. Pulled out of hole
to 941 ft. Pulled BHA. Rigged up Casing handling equipment.
May 2 1996 (6)
Rigged up Casing handling equipment. Ran Casing to 1950 ft (4.5 in OD).
Circulated at 1590 ft. Ran Drillpipe in stands to 9250 ft. Circulated at 9250 ft. Pulled
Drillpipe in stands to 11060 ft. Circulated at 11060 ft. Mixed and pumped slurry - 47
bbl. Reverse circulated at 9090 ft. Pulled Drillpipe in stands to 0 ft. Made up BHA no.
7. R.I.H. to 5000 ft.
May 3 1996 (7)
R.I.H. to 10973 ft. Circulated at 10973 ft. Circulated at 10973 ft. Tested Casing - Via
annulus and string. Pulled out of hole to 0 ft. Made up DST tools - TCP guns. Ran
Drillpipe in stands to 10891 ft. Perforated from 9880 ft to 10890 ft. Laid down 1000
ft of Drillpipe.
May 4 1996 (8)
Laid down 7900 ft of Drillpipe. Laid down 90 ft of Drillpipe. Serviced Block line.
Laid down 1900 ft of Tubing. Rigged up Completion string handling equipment. Ran
Tubing to 2500 ft (4.5 in OD). Repaired Handling equipment. Ran Tubing to 7000 ft
(4.5 in OD). Tested Dual control line. Ran Tubing to 9080 ft (4.5 in OD).
May 5 1996 (9)
Space out tubulars. Reverse circulated at 9090 ft. Set packer at 9055 ft with 4000
psi. Retrieved Tubing landing string. Rigged up Top ram. Rigged down BOP stack.
Installed Xmas tree. Removed Hanger plug. Tested Tubing. Freeze protect well -
70 bbl of Diesel.
Page 4
RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
Psu/15-45
500292267100
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 042096
MWD SURVEY
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9507.38 8522.61 8454.55
9531.00 8545.14 8477.08
9533.54 8547.57 8479.51
9565.32 8577.71 8509.65
9597.41 8607.36 8539.30
17 49
17 4
17 0
20 4
24 47
N 13.70 W .00
N 14.51 W 3.34
N 14.60 W 2.91
N 26.50 W 15.27
N 27.40 W 14.78
3586.83N 1300.29W 3777.62
3593.70N 1302.02W 3784.50
3594.42N 1302.20W 3785.22
3603.81N 1305.81W 3795.20
3614.72N 1311.37W 3807.44
9629.18 8635.53 8567.47
9660.94 8662.20 8594.14
9692.64 8687.23 8619.17
9724.58 8710.70 8642.64
9755.68 8731.47 8663.41
30 13 N 24.30 W 17.64
35 32 N 21.60 W 17.37
40 5 N 17.60 W 16.33
45 17 N 15.30 W 16.99
50 50 N 13.10 W 18.60
3627.93N 1317.73W 3822.09
3643.81N 1324.42W 3839.26
3662.12N 1330.90W 3858.47
3682.89N 1337.01W 3879.68
3705.31N 1342.67W 3902.13
9788.19 8750.81 8682.75
9819.83 8766.79 8698.73
9851.51 8778.92 8710.86
9883.51 8786.60 8718.54
9915.28 8789.59 8721.53
56 9 N 8.10 W 20.45
63 9 N 8.10 W 22.12
71 47 N 7.90 W 27.28
80 24 N 8.10 W 26.91
88 46 N 7.60 W 26.39
3730.98N 1347.43W 3927.04
3758.00N 1351.28W 3952.70
3786.95N 1355.34W 3980.18
3817.68N 1359.66W 4009.34
3848.98N 1363.98W 4039.01
9947.03 8790.15 8722.09
9978.69 8790.25 8722.19
10010.41 8789.43 8721.37
10042.11 8787.83 8719.77
10073.80 8786.38 8718.32
89 13 N 7.20 W 1.92
90 24 N 6.70 W 4.02
92 33 N 5.40 W 7.95
93 13 N 6.60 W 4.33
92 0 N 12.00 W 17.46
3880.46N 1368.07W 4068.73
3911.89N 1371.90W 4098.28
3943.41N 1375.24W 4127.69
3974.90N 1378.55W 4157.04
4006.13N 1383.66W 4187.02
10105.53 8785.56 8717.50
10137.23 8785.23 8717.17
10169.39 8785.53 8717.47
10201.14 8786.27 8718.21
10232.30 8786.79 8718.73
9O 56
90 15
88 41
88 36
89 28
N 16.10 W 13.33
N 21.10 W 15.93
N 24.80 W 12.47
N 26.60 W 5.67
N 32.20 W 18.18
4036.89N 1391.36W 4217.80
4066.92N 1401.47W 4249.06
4096.53N 1414.01W 4281.09
4125.13N 1427.77W 4312.80
4152.26N 1443.06W 4343.94
10264.60 8786.60 8718.54
10296.33 8786.08 8718.02
10328.09 8786.09 8718.03
10359.93 8786.57 8718.51
10391.59 8786.80 8718.74
91 11
9O 4O
89 17
88 58
90 10
N 36.70 W 14.91
N 41.70 W 15.84
N 47.40 W 18.47
N 52.40 W 15.73
N 57.80 W 17.47
4178.89N 1461.32W 4376.02
4203.46N 1481.37W 4407.13
4226.09N 1503.64W 4437.56
4246.59N 1527.99W 4467.08
4264.69N 1553.94W 4495.25
10423.30 8786.27 8718.21
10455.15 8784.97 8716.91
10486.74 8783.53 8715.47
10518.56 8782.47 8714.41
10550.43 8781.90 8713.84
91 45
92 53
92 20
91 28
90 34
N 62.60 W 15.93
N 67.30 W 15.16
N 72.40 W 16.22
N 77.50 W 16.25
N 82.50 W 15.94
4280.45N 1581.44W 4522.07
4293.92N 1610.27W 4547.49
4304.78N 1639.88W 4570.98
4313.04N 1670.58W 4592.67
4318.57N 1701.95W 4612.27
JUL 0
0~i ?., Ga.:"; Cons. commission
Ai!,.shoi's. ga
RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/15-45
500292267100
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 042096
MWD SURVEY
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
10582.22 8781.89 8713.83 89 26 N 88.10 W 17.98
10614.01 8782.26 8714.20 89 13 S 86.40 W 17.31
10645.54 8782.34 8714.28 90 27 S 82.50 W 12.97
10676.53 8781.58 8713.52 92 22 S 82.50 W 6.16
10774.00 8777.55 8709.49 92 22 S 82.50 W .00
4321.17N 1733.62W 4629.43
4320.70N 1765.40W 4643.92
4317.65N 1796.77W 4655.95
4313.61N 1827.48W 4666.79
4300.90N 1924.04W 4700.86
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4711.65 FEET
AT NORTH 24 DEG. 6 MIN. WEST AT MD = 10774
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 332.02 DEG.
TIE IN POINT 9507.38
KICKOFF POINT 9531'
INTERPOLATED DEPTH 10774'
. ."
RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU/15-45
500292267100
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 042096
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9507.38 8522.61 8454.55
10507.38 8782.79 8714.73
10774.00 8777.55 8709.49
3586.83 N 1300.29 W 984.77
4310.45 N 1659.71 W 1724.59 739.82
4300.90 N 1924.04 W 1996.45 271.86
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
~ RRY SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/15-45
500292267100
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 042096
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06
OPERATOR: ARCO ALASKA INC
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9507.38 8522.61 8454.55 3586.83 N 1300.29 W 984.77
9555.11 8568.06 8500.00 3600.75 N 1304.49 W 987.05 2.28
9668.21 8668.06 8600.00 3647.82 N 1325.96 W 1000.15 13.10
9822.98 8768.06 8700.00 3760.86 N 1351.68 W 1054.92 54.78
9847.38 8777.59 8709.53 3783.07 N 1354.81 W 1069.79 14.87
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
S ....RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
MWD SURVEY
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
.00 .00 -68.06
117.90 117.90 49.84
211.95 211.95 143.89
301.90 301.89 233.83
391.81 391.78 323.72
0 0
0 18
0 16
0 56
1 39
N .00 E .00 .00N .00E
N 44.50 W .26 .23N .22W
N 42.50 W .04 .58N .56W
S 72.60 W .96 .52N 1.41W
S 86.20 W .87 .21N 3.41W
.00
.31
.77
1.12
1.79
481.86 481.76 413.70
571.30 571.00 502.94
661.41 660.63 592.57
750.61 749.03 680.97
840.73 838.10 770.04
2 29
4 56
6 43
8 27
9 6
S 88.20 W .93 .07N 6.67W 3.19
S 88.80 W 2.75 .08S 12.47W 5.78
S 86.80 W 1.99 .45S 21.63W 9.75
S 89.50 W 1.98 .80S 33.41W 14.97
N 89.80 W .73 .83S 47.17W 21.39
929.59 925.66 857.60
1019.17 1013.77 945.71
1113.74 1106.73 1038.67
1206.15 1197.30 1129.24
1299.11 1287.78 1219.72
10 26
10 19
10 49
12 2
14 30
N 82.30 W 2.08 .27N 62.19W 29.42
N 75.80 W 1.32 3.33N 78.02W 39.54
N 69.90 W 1.26 8.46N 94.58W 51.84
N 62.40 W 2.07 15.91N 111.27W 66.25
N 55.70 W 3.12 26.96N 129.48W 84.56
1391.98 1377.57 1309.51
1484.53 1466.99 1398.93
1576.70 1556.15 1488.09
1669.82 1646.21 1578.15
1763.76 1736.72 1668.66
15
14
14
14
16
4
5O
3O
56
5
N 49.70 W 1.76 41.32N 148.30W
N 48.60 W .40 56.95N 166.37W
N 43.80 W 1.37 73.09N 183.22W
N 41.90 W .69 90.44N 199.31W
N 38.30 W 1.60 109.67N 215.46W
106.07
128.35
150.50
173.38
197.94
1855.36 1824.77 1756.71
1947.42 1913.07 1845.01
2040.74 2002.33 1934.27
2133.01 2090.11 2022.05
2226.31 2177.82 2109.76
15 55
16 53
17 2
18 46
21 2
N 34.80 W 1.07 129.96N 230.50W
N 30.00 W 1.81 151.92N 244.40W
N 26.10 W 1.23 175.95N 257.20W
N 22.80 W 2.17 201.79N 268.91W
N 21.90 W 2.44 231.17N 280.98W
222.91
248.83
276.05
304.37
335.98
2319.06 2263.70 2195.64
2412.92 2349.02 2280.96
2504.71 2430.42 2362.36
2596.19 2510.07 2442.01
2690.34 2591.20 2523.14
23
25
29
29
31
16
58
3
51
7
N 19.70 W 2.58 263.88N 293.37W
N 18.20 W 2.94 300.87N 306.04W
N 15.90 W 3.56 341.41N 318.43W
N 14.20 W 1.26 384.86N 330.10W
N 15.70 W 1.56 431.00N 342.43W
370.67
409.28
450.90
494.74
541.28
2785.66 2672.74 2604.68
2876.34 2750.30 2682.24
2970.30 2830.66 2762.60
3064.62 2911.03 2842.97
3155.71 2988.25 2920.19
31
31
31
31
32
15
10
15
51
12
N 15.90 W .17 478.49N 355.87W
N 14.80 W .63 523.80N 368.31W
N 13.20 W .89 571.04N 380.09W
N 15.90 W 1.63 618.80N 392.50W
N 15.20 W .55 665.34N 405.44W
589.53
635.37
682.62
730.61
777.79
JUL 0 2 ]~J~
o'-;I ~ Gas Cans. commission
F'~-'RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
MWD SURVEY
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT·
3249.90 3067.88 2999.82
3341.54 3145.35 3077.29
3434.16 3223.65 3155.59
3529.25 3303.60 3235.54
3621.37 3380.38 3312.32
32 22 N 16.60 W .81 713.72N 419
32 12 N 16.70 W .18 760.62N 433
32 21 N 15.80 W .54 808.12N 447
33 12 N 18.00 W 1.53 857.36N 462
33 52 N 17.50 W .80 905.84N 477
.23W
.25W
· i0W
· 07W
.59W
826.98
874.98
923.42
973.93
1024.02
3714.94 3458.44 3390.38
3774.51 3508.39 3440.33
3870.67 3589.21 3521.15
3964.48 3668.39 3600.33
4057.42 3746.91 3678.85
33 1 N 18.00 W .96 954.96N 49
33 0 N 18.20 W .18 985.82N 50
32 37 N 19.70 W .94 1035.10N 52
32 13 N 20.10 W .47 1082.40N 53
32 28 N 17.40 W 1.58 1129.48N 55
3.31W
3.39W
0.31W
7.43W
3.41W
1074.78
1106.76
1158.22
1208.02
1257.10
4150.97 3825.82 3757.76
4245.54 3905.70 3837.64
4339.62 3985.33 3917.27
4433.25 4064.79 3996.73
4526.76 4143.91 4075.85
32 29 N 17.60 W .12 1177.39N 56
32 15 N 17.50 W .26 1225.67N 58
32 5 N 17.20 W .23 1273.49N 59
31 45 N 18.30 W .72 1320.65N 61
32 39 N 16.00 W 1.63 1368.27N 62
8.52W
3 . 78W
8.72W
3 . 82W
8.50W
1306.50
1356.29
1405.53
1454.26
1503.20
4620.31 4222.60 4154.54
4713.52 4301.00 4232.94
4806.37 4379.21 4311.15
4901.20 4459.18 4391.12
4994.46 4537.81 4469.75
32 47 N 16.00 W .15 1416.89N 64
32 41 N 16.00 W .12 1465.35N 65
32 32 N 15.90 W .17 1513.47N 67
32 28 N 16.60 W .40 1562.40N 68
32 34 N 16.60 W .09 1610.45N 69
2.44W
6.34W
0.09W
4.35W
8.68W
1552.68
1602.00
1650.94
1700.84
1750.00
5089.12 4617.79 4549.73
5182.09 4696.68 4628.62
5276.57 4776.44 4708.38
5369.34 4853.71 4785.65
5462.16 4930.40 4862.34
32 5 N 15.10 W .98 1659.15N 71
31 47 N 15.80 W .51 1706.57N 72
33 1 N 15.40 W 1.31 1755.34N 73
34 10 N 18.50 W 2.23 1804.42N 75
34 22 N 18.90 W .32 1853.94N 77
2.51W
5.61W
9.23W
4.21W
0.97W
1799.50
1847.52
1896.98
1947.35
1998.95
5554.79 5006.77 4938.71
5649.60 5084.67 5016.61
5741.62 5159.96 5091.90
5834.40 5236.20 5168.14
5927.83 5313.77 5245.71
34 32 N 18.80 W .19 1903.55N 78
34 57 N 18.20 W .56 1954.80N 80
35 14 N 18.20 W .32 2005.06N 82
34 15 N 18.20 W 1.07 2055.29N 83
33 29 N 18.40 W .82 2104.72N 85
7.91W
5.05W
1.58W
8.09W
4.44W
2050.70
2104.01
2156.14
2208.25
2259·58
5991.11 5366.27 5298.21
6052.71 5417.18 5349.12
6145.76 5494.13 5426.07
6238.66 5570.88 5502.82
6333.48 5649.96 5581.90
34 22 N 18.60 W 1.40 2138.22N 86
34 10 N 18.10 W .56 2171.14N 87
34 14 N 18.90 W .49 2220.74N 89
34 21 N 18.40 W .33 2270.35N 90
32 35 N 17.30 W 1.96 2320.12N 92
5.65W
6.57W
3.16W
9.91W
5.95W
2294.41
2328.61
2380.20
2431.86
2483.35
S--'RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED'SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
MWD SURVEY
JOB NIIMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6427.87 5729.88 5661.8
6521.45 5809.40 5741.3
6616.46 5889.99 5821.9
6708.86 5968.40 5900.3
6802.29 6047.72 5979.6
2 31 40 N 18.20 W 1.11 2367.94N 941.25W
4 31 58 N 18.70 W .43 2414.74N 956.86W
3 31 59 N 18.80 W .06 2462.39N 973.04W
4 31 53 N 20.00 W .69 2508.50N 989.28W
6 31 53 N 20.40 W .23 2554.84N 1006.32W
2532.75
2581.41
2631.08
2679.42
2728.34
6895.33 6126.80 6058.7
6989.15 6206.74 6138.6
7082.17 6286.39 6218.3
7176.96 6368.01 6299.9
7268.05 6446.88 6378.8
4 31 40 N 20.20 W .27 2600.80N 1023.33W
8 31 27 N 17.60 W 1.47 2647.25N 1039.23W
3 30 45 N 17.40 W .77 2693.08N 1053.68W
5 30 21 N 17.40 W .41 2739.06N 1068.09W
2 29 41 N 16.90 W .79 2782.61N 1081.54W
2776.90
2825.39
2872.64
2920.01
2964.78
7362.14 6529.82 6461.7
7455.45 6613.31 6545.2
7549.97 6698.04 6629.9
7641.62 6780.54 6712.4
7734.34 6864.64 6796.5
6 26 38 N 15.60 W 3.31 2825.24N 1093.99W
5 26 24 N 16.00 W .31 2865.33N 1105.33W
8 26 11 N 18.00 W .97 2905.38N 1117.57W
8 25 27 N 17.70 W .81 2943.38N 1129.81W
8 24 19 N 16.50 W 1.34 2980.67N 1141.29W
3008.26
3048.99
3090.10
3129.40
3167.72
7827.69 6949.97 6881.9
7922.19 7036.72 6968.6
8015.33 7122.45 7054.3
8108.76 7208.67 7140.6
8202.39 7295.28 7227.2
1 23 31 N 16.10 W .87 3017.00N 1151.92W
6 23 12 N 16.10 W .33 3053.01N 1162.31W
9 22 47 N 15.80 W .46 3088.00N 1172.31W
1 22 31 N 16.40 W .39 3122.59N 1182.29W
2 22 7 N 15.80 W .48 3156.76N 1192.16W
3204.78
3241.46
3277.06
3312.28
3347.09
8295.39 7381.66 7313.6
8387.54 7467.66 7399.6
8479.80 7554.21 7486.1
8574.73 7643.50 7575.4
8668.54 7731.46 7663.4
0 21 22 N 15.30 W .84 3189.96N 1201.40W
0 20 44 N 15.90 W .72 3221.84N 1210.30W
5 19 46 N 17.70 W 1.25 3252.42N 1219.52W
4 19 -55 N 17.50 W .17 3283.14N 1229.26W
0 20 44 N 15.10 W 1.25 3314.41N 1238.40W
3380.74
3413.07
3444.40
3476.10
3508.01
8761.71 7818.86 7750.8
8855.76 7907.51 7839.4
8947.96 7994.44 7926.3
9041.00 8081.99 8013.9
9133.88 8169.54 8101.4
0 19 47 N 12.20 W 1.48 3345.76N 1246.03W
5 19 14 N 13.00 W .65 3376.42N 1252.88W
8 19 41 N 13.20 W .49 3406.34N 1259.84W
3 19 51 N 12.60 W .28 3437.03N 1266.87W
8 19 8 N 12.30 W .77 3467.31N 1273.55W
3539.27
3569.56
3599.25
3629.64
3659.52
9180.19 8213.34 8145.2
9255.27 8284.28 8216.2
9285.56 8312.82 8244.7
9381.15 8402.87 8334.8
9475.82 8492.40 8424.3
8 18 46 N 11.70 W .92 3482.02N 1276.68W
2 19 26 N 12.90 W 1.03 3506.03N 1281.92W
6 19 43 N 13.30 W 1.02 3515.92N 1284.22W
1 19 28 N 11.80 W .59 3547.21N 1291.19W
4 18 27 N 13.60 W 1.24 3577.21N 1297.94W
3673.99
3697.65
3707.46
3738.36
3768.02
S?~RRY-SUN DRILLING SERVICES -'
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
DATE OF SURVEY: 4/24/96
MWD SURVEY
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06
OPERATOR: ARCO ALASKA INC
FT.
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT·
9507.38 8522.39 8454.33 17 49
9533.06 8546.79 8478.73 18 33
9565.07 8576.53 8508.47 24 43
9596.67 8604.32 8536.26 32 0
9628.43 8630.09 8562.03 39 23
N 13.70 W 1.97 3586.76N 1300
N 13.20 W 2.91 3594.56N 1302
N 8.60 W 19.98 3606.15N 1304
N 5.00 W 23.66 3621.05N 1306
N 2.60 W 23.65 3639.53N 1307
.26W
.12W
.29W
.01W
.20W
3777.54
3785.30
3796.56
3810.52
3827.40
9660.26 8653.69 8585.63 44 54
9692.03 8676.05 8607.99 45 37
9723.90 8697.34 8629.28 50 30
9755.61 8716.53 8648.47 55 1
9787.52 8734.44 8666.38 56 40
N .20 W 18.03
N 1.50 E 4.44
N 5.70 E 18.15
N 9.20 E 16.74
N 10.10 E 5.70
3660.87N 1307
3683.43N 1307
3707.08N 1305
3732.09N 1302
3758.12N 1298
· 70W
.44W
· 92W
.63W
.20W
3846.48
3866.29
3886.45
3907.00
3927.91
9819.22 8750.23 8682.17 63 32
9850.95 8762.80 8694.74 69 45
9881.34 8772.74 8704.68 72 4
9914.41 8781.43 8713.38 77 24
9946.21 8787.98 8719.92 78 50
N 10.40 E 21.66
N 9.60 E 19.74
N 8.10 E 8.95
N '6.40 E 16.86
N 5.90 E 4.75
3785.15N 1293
3813.83N 1288
3842.20N 1283
3873.84N 1279
3904.78N 1276
.31W
.26W
.84W
· 82W
.49W
3949.48
3972.44
3995.42
4021.48
4047.23
9977.98 8793.58 8725.52 80 49
10009.71 8797.64 8729.58 84 28
10041.50 8800.77 8732.71 84 14
10073.39 8804.00 8735.94 84 8
10105.07 8806.71 8738.65 86 3
N 5.90 E 6.26
N 2.90 E 14.82
N 3.50 E 2.01
N 3.70 E .70
N 2.90 E 6.53
3935.88N 1273
3967.25N 1270
3998.83N 1269
4030.49N 1267
4062.00N 1265
· 28W
· 87W
. i0W
. llW
.29W
4073.19
4099.76
4126.83
4153.86
4180.83
10134.58 8807.72 8739.66 90 1
10167.08 8807.72 8739.66 89 58
10199.05 8807.39 8739.33 91 11
10230.44 8806.22 8738.17 93 3
10263.37 8804.60 8736.54 92 37
N 3.70 E 13.76
N 2.80 E 2.78
N 1.30 W 13.39
N 6.20 W 16.67
N 10.00 W 11.60
4091.44N 1263
4123.89N 1261
4155.84N 1261
4187.13N 1263
4219.69N 1268
.59W
· 75W
.33W
.38W
· 02W
4206·03
4233.82
4261.84
4290.44
4321.36
10293.92 8803.38 8735.32 91 56
10327.10 8802.05 8733.99 92 39
10358.85 8800.41 8732.35 93 16
10390.61 8798.44 8730.38 93 49
10422.45 8796.64 8728.58 92 40
N 14.40 W 14.56
N 18.20 W 11.64
N 23.40 W 16.47
N 29.20 W 18.31
N 36.50 W 23.17
4249.52N 1274
4281.33N 1283
4310.96N 1295
4339.37N 1309
4366.06N 1326
· 47W
· 77W
· 03W
· 06W
.30W
4350.73
4383.19
4414.64
4446.31
4477.96
10454.12 8795.24 8727.18
10484.00 8793.70 8725.64
10516.89 8790.64 8722.58
10548.68 8786.00 8717.94
10580.44 8781.31 8713.25
92 22 N 45.17 W 27.37
93 33 N 51.00 W 19.88
97 6 N 57.50 W 22.46
99 39 N 63.70 W 20.88
97 20 N 69.40 W 19.18
4389.97N 1346.97W
4409.90N 1369.16W
4429.02N 1395.71W
4444.46N 1423.10W
4456.95N 1451.90W
4508.78
4536.79
4566.14
4592.61
4617.16
?~--qRRY-SUN DRILLING SERVICES
ANCI{ORAGE ALASKA
PAGE 5
SHARED SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
MWD SURVEY
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
10612.16 8777.53 8709.47 96 19 N 76.40 W 22.15
10643.90 8774.79 8706.73 93 34 N 81.90 W 19.31
10702.00 8771.17 8703.11 93 34 N 81.90 W .03
4466.20N 1481.98W 4639.44
4472.14N 1513.03W 4659.26
4480.31N 1570.44W 4693.41
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4747.58 FEET
AT NORTH 19 DEG. 18 MIN. WEST AT MD = 10702
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 332.02 DEG.
SURFACE TO 10702'
"RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -68.06 .00 N .00 E
1000.00 994.91 926.85 2.48 N 74.69 W
2000.00 1963.38 1895.32 165.22 N 251.95 W
3000.00 2856.05 2787.99 586.04 N 383.61 W
4000.00 3698.44 3630.38 1100.19 N 543.94 W
.00
5.09 5.09
36.62 31.53
143.95 107.33
301.56 157.61
5000.00 4542.48 4474.42 1613.31 N 699.53 W 457.52
6000.00 5373.61 5305.55 2142.97 N 867.25 W 626.39
7000.00 6216.00 6147.94 2652.65 N 1040.95 W 784.00
8000.00 7108.32 7040.26 3082.29 N 1170.70 W 891.68
9000.00 8043.43 7975.37 3423.43 N 1263.83 W 956.57
155.95
168.87
157.61
107.68
64.89
10000.00 8796.61 8728.55 3957.61 N 1271.43 W 1203.39
10702.00 8771.17 8703.11 4480.31 N 1570.44 W 1930.83
246.82
727.44
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
S ..... RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -68.06
68.06 68.06 .00
168.06 168.06 100.00
268.06 268.06 200.00
368.08 368.06 300.00
468.14 468.06 400.00
568.35 568.06 500.00
668.89 668.06 600.00
769.84 768.06 700.00
871.08 868.06 800.00
.00 N .00 E
.04 N .03 W
.42 N .41 W
.69 N .88 W
· 26 N 2.73 W
.08 N 6.07 W
.07 S 12.21 W
.50 S 22.50 W
.83 S 36.24 W
· 82 S 51.98 W
.00
.00 .00
.00 .00
.00 .00
.02 .02
.08 .06
.29 .21
.83 .54
1.78 .95
3.02 1.23
972.71 968.06 900.00
1074.37 1068.06 1000.00
1176.25 1168.06 1100.00
1278.77 1268.06 1200.00
1382.13 1368.06 1300.00
1.39 N 69.92 W
5.95 N 87.63 W
13.02 N 105.74 W
24.19 N 125.32 W
39.67 N 146.34 W
4.65 1.63
6.31 1.66
8.19 1.88
10.71 2.52
14.07 3.36
1485.64 1468.06 1400.00
1589.00 1568.06 1500.00
1692.43 1668.06 1600.00
1796.38 1768.06 1700.00
1900.38 1868.06 1800.00
2004.90 1968.06 1900.00
2109.72 2068.06 2000.00
2215.85 2168.06 2100.00
2323.81 2268.06 2200.00
2434.18 2368.06 2300.00
2547.80 2468.06 2400.00
2663.32 2568.06 2500.00
2780.18 2668.06 2600.00
2897.10 2768.06 2700.00
3014.06 2868.06 2800.00
3131.84 2968.06 2900.00
3250.11 3068.06 3000.00
3368.38 3168.06 3100.00
3486.79 3268.06 3200.00
3606.53 3368.06 3300.00
57.14 N 166.58 W
75.31 N 185.35 W
94.78 N 203.20 W
116.77 N 221.06 W
140.11 N 237.55 W
166.51 N 252.58 W
194.88 N 266.01 W
227.69 N 279.58 W
265.67 N 294.00 W
309.86 N 308.94 W
361.60 N 324.12 W
417.56 N 338.65 W
475.76 N 355.10 W
534.19 N 371.06 W
593.15 N 385.32 W
653.07 N 402.11 W
713.83 N 419.26 W
774.33 N 437.37 W
835.26 N 454.91 W
897.95 N 475.10 W
17.58 3.51
20.94 3.36
24.37 3.43
28.32 3.94
32.32 4.01
36.84 4.52
41.66 4.82
47.79 6.14
55.75 7.96
66.12 10.36
79.74 13.62
95.26 15.52
112.12 16.87
129.04 16.92
146.00 16.96
163.78 17.78
182.05 18.26
200.32 18.27
218.73 18.41
238.47 19.74
'RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/15-45pB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06
OPERATOR: ARCO ALASKA INC
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
3726.41 3468.06 3400.00
3845.56 3568.06 3500.00
3964.09 3668.06 3600.00
4082.49 3768.06 3700.00
4201.04 3868.06 3800.00
960.91 N
1022.36 N
1082.20 N
1142.33 N
1203.02 N
495.24 W 258.35 19.88
515.75 W 277.50 19.15
537.36 W 296.03 18.53
557.43 W 314.43 18.40
576.64 W 332.98 18.54
4319.24 3968.06 3900.00
4437.09 4068.06 4000.00
4555.45 4168.06 4100.00
4674.38 4268.06 4200.00
4793.14 4368.06 4300.00
1263.14 N
1322.57 N
1383.15 N
1445.02 N
1506.63 N
595.52 W 351.18 18.20
614.45 W 369.03 17.86
632.77 W 387.39 18.35
650.51 W 406.31 18.93
668.14 W 425.08 18.77
4911.73 4468.06 4400.00
5030.35 4568.06 4500.00
5148.41 4668.06 4600.00
5266.58 4768.06 4700.00
5386.69 4868.06 4800.00
1567.82 N
1628.97 N
1689.50 N
1750.09 N
1813.67 N
685.97 W 443.67 18.58
704.20 W 462.29 18.62
720.78 W 480.35 18.06
737.78 W 498.52 18.16
757.30 W 518.63 20.12
5507.80 4968.06 4900.00
5629.33 5068.06 5000.00
5751.53 5168.06 5100.00
5872.95 5268.06 5200.00
5993.27 5368.06 5300.00
1878.34 N 779.32 W 539.74 21.11
1943.77 N 801.42 W 561.27 21.53
2010.49 N 823.36 W 583.47 22.20
2075.90 N 844.87 W 604.89 21.41
2139.38 N 866.04 W 625.21 20.33
6114.22 5468.06 5400.00
6235.25 5568.06 5500.00
6354.97 5668.06 5600.00
6472.74 5768.06 5700.00
6590.60 5868.06 5800.00
2203.95 N
2268.52 N
2331.18 N
2390.33 N
2449.43 N
887.42 W 646.16 20.94
909.30 W 667.19 21.03
929.39 W 686.91 19.72
948.63 W 704.68 17.77
968.62 W 722.54 17.87
6708.46 5968.06 5900.00
6826.25 6068.06 6000.00
6943.80 6168.06 6100.00
7060.85 6268.06 6200.00
7177.02 6368.06 6300.00
2508.31 N 989.20 W 740.40 17.86
2566.71 N 1010.74 W 758.19 17.79
2624.70 N 1032.03 W 775.74 17.54
2682.68 N 1050.42 W 792.79 17.05
2739.09 N 1068.10 W 808.96 16.17
7292.33 6468.06 6400.00
7404.92 6568.06 6500.00
7516.56 6668.06 6600.00
7627.80 6768.06 6700.00
7738.09 6868.06 6800.00
2793.97 N
2843.70 N
2891.35 N
2937.72 N
2982.15 N
1084.95 W
1099.15 W
1113.02 W
1128.00 W
1141.73 W
824.27 15.31
836.86 12.59
848.50 11.64
859.74 11.24
870.03 10.29
~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/15-45PB1
500292267170
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/ 7/96
DATE OF SURVEY: 4/24/96
JOB NUMBER: AK-MW-60042
KELLY BUSHING ELEV. = 68.06
OPERATOR: ARCO ALASKA INC
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE
MEASD VERTICAL
DEPTH DEPTH
SUB-SEA TOTAL
VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
7847.42 6968.06 6900.00 3024.56 N 1154.10 W 879.36
7956.29 7068.06 7000.00 3065.92 N 1166.04 W 888.23
8064.79 7168.06 7100.00 3106.43 N 1177.54 W 896.73
8173.00 7268.06 7200.00 3146.11 N 1189.14 W 904.94
8280.79 7368.06 7300.00 3184.82 N 1200.00 W 912.73
9.33
8.87
8.50
8.21
7.78
8387.97 7468.06 7400.00 3221.99 N 1210.34 W 919.91
8494.52 7568.06 7500.00 3257.16 N 1221.03 W 926.46
8600.85 7668.06 7600.00 3291.62 N 1231.94 W 932.79
8707.66 7768.06 7700.00 3327.77 N 1241.97 W 939.60
8813.97 7868.06 7800.00 3362.97 N 1249.79 W 945.91
7.19
6.55
6.33
6.81
6.31
8919.94 7968~06 7900.00 3397.15 N 1257.69 W 951.88
9026.19 8068.06 8000.00 3432.11 N 1265.77 W 958.13
9132.31 8168.06 8100.00 3466.81 N 1273.45 W 964.25
9238.07 8268.06 8200.00 3500.45 N 1280.64 W 970.01
9344.23 8368.06 8300.00 3535.16 N 1288.67 W 976.17
5.98
6.24
6.13
5.75
6.16
9450.16 8468.06 8400.00 3569.32 N 1296.03 W 982.10
9555.86 8568.06 8500.00 3602.58 N 1303.69 W 987.79
9680.61 8668.06 8600.00 3675.27 N 1307.65 W 1012.55
9866.76 8768.06 8700.00 3828.55 N 1285.91 W 1098.70
9900.00 8778.01 8709.95 3859.94 N 1281.47 W 1121.99
5.93
5.70
24.76
86.15
23.29
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
Survey Reference: WELLHEAD
Reference World Coordinates: Lat. 70.17.56 N - Long. 148.34.28 W
Reference GRID System: Alaska State Plane Zone: Alaska 4
Reference GRID Coordinates: (ft): 5960952.49 N 676014.44 E
North Aligned To: TRUE NORTH
Vertical Section Reference: WELLHEAD
Closure Reference: WELLHEAD
TVD Reference: WELLHEAD
Halliburton Energy Services - Drilling Systems PSL
Survey Report
Calculated using the Minimum Curvature Method
Computed using WIN-CADDS REV2.2.1
Vertical Section Plane: 332.66 deg.
Page 1
Job No: 00237
Date: 6/13/96
Time: 7:19 am
Wellpath ID: 15-45 MWD
Date Created: 4/8/96
Last Revision: 4/30/96
B_P.~ axed Services Drilling
AlaL. ,cate Plane: ZoneA
PBU: EOA: DS15
15-45 As-Built
15-45 MWD
Measured Incl Drift Subsea TVD Course T O T A L
Depth Dir. Depth Length Rectangular Offsets
(fl) (deg.) (deg.) (ft) (ft) (fl) (ft) (ft)
GRID Coordinates
Northing Easting
(ft) (ft)
Closure Vertical Build Walk DLS Cum. Expected Total Max Hot Min Hot Dir. Vert
Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error
(fl) (deg.) fit) (dg/100ft) (dg/100ft) (dg/100ft) (deg) (ft) (fl) (ft) (ft) (deg.) fit)
Survey Tool
10690.10 93.50 263.50 8714.63 8781.13 13.57 4311.80N 1841.11W 5965219.94 674073.49 4688.42@336.88 4675.73 8.11 7.37 10.95 274.8 4274.91N 1887.31W 173.84 40.16 64.78 32.52 BPHM-PBD
10721.90 94.18 261.70 8712.50 8779.00 31.80 4307.71N 1872.5TN 5965215.13 674042.14 4697.11@336.51 4686.55 2.14 -5.66
10754.21 92.68 262.54 8710.57 8777.07 32.31 4303.29N 1904.52rff 5965209.97 674010.32 4705.9£@336.13 4697.29 -4.64 2.60
10785.40 91.30 263.80 8709.49 8775.99 31.19 4299.58N 1935.4t33/ 5965205.54 673979.48 4715.13@335.77 4708.21 -4.42 4.04
10817.16 90.31 262.59 8709.04 8775.54 31.76 4295.82N 1967.0CW 5965201.05 673948.05 4724.74@335.40 4719.35 -3.12 -3.81
10849.18 90.40 264.77 8708.84 8775.34 32.02 4292.29N 1998.82Nf 5965196.79 673916.33 4734.88@335.03 4730.83 0.28 6.81
10878.52 89.87 264.46 8708.77 8775.27 29.34 4289.54N 2028.0~N 5965193.36 673887.20 4744.79@334.70 4741.80 -1.81 -1.06
10910.51 89.43 265.61 8708.97 8775.47 31.99 4286.77N 2059.9t-W 5965189.86 673855.42 4756.01@334.33 4753.98 -1.38 3.59
10943.05 88.20 265.10 8709.64 8776.14 32.54 4284.14N 2092.32W 5965186.48 673823.08 4767.77@333.97 4766.53 -3.78 -1.57
/
10~'~ ~7 86.09 263.99 8711.27 8777.77 32.82 4281.02N 2124.9~qV 5965182.61 673790.54 4779.39@333.60 4778.75 -6.43 -3.38
11020.28 85.82 263.46 8714.41 8780.91 44.41 4276.18N 2168.9¢W 5965176.75 673746.65 4794.81@333.10 4794.67 -0.61 -1.19
11060.00 85.82 263.00 8717.30 8783.80 39.72 4271.51N 2208.32W 5965171.17 673707.44 4808.59@332.66 4808.59 0.00 -1.16
6.04 276.7 4268.93N 1918.4~cw 174.33 40.67 64.21 32.83 BPHM-PBD
5.32 278.4 4262.57N 1950.1~cW 174.88 41.21 63.63 33.14 BPHM-PBD
5.99 280.3 4256.98N 1980.9-~W 175.46 41.76 63.08 33.44 BPHM-PBD
4.92 281.8 4251.31N 2012.21W 176.04 42.35 62.51 33.75 BPHM-PBD
6.81 284.0 4245.85N 2043.8C5V 176.70 42.97 61.94 34.05 BPHM-PBD
2.09 284.6 4241.32N 2072.9CXV 177.31 43.55 61.42 34.34 BPHM-PBD
3.85 285.9 4236.61N 2104.6zW~r 178.03 44.21 60.85 34.65 BPHM-PBD
4.09 287.2 4232.00N 2136.8~Wq 178.76 44.90 60.27 34.96 BPHM-PBD
7.26 289.6 4226.91N 2169.2~cW 179.49 45.61 59.69 35.28 BPHM-PBD
1.34 290.2 4219.41N 2213.0~W 180.48 46.61 58.90 35.71 BPHM-PBD
1.16 290.6 4207.94N 2251.5-~W 182.10 49.95 57.57 37.02 PROJECTED
Survey Reference: WELLHEAD
Reference World Coordinates: Lat. 70.17.56 N- Long. 148.34.28 W
Reference GRID System: Alaska State Plane Zone: Alaska 4
Reference GRID Coordinates: (fl): 5960952.49 N 676014.44 E
North Aligned To: TRUE NORTH
Vertical Section Reference: WELLHEAD
Closure Reference: WELLHEAD
TVD Reference: WELLHEAD
Halliburton Energy Services - Drilling Systems PSL
Survey Report
Calculated using the Minimum Curvature Method
Computed using WIN-CADD$ REV2.2. I
Vertical Section Plane: 332.66 deg.
Page 1
Job No: 00237
Date: 6/13/96
Time: 7:20 am
Wellpath ID: 15-45 MWD
Date Created: 4/8/96
Last Revision: 4/30/96
ORiGINaL
BI~~ ~,hared Services Drilling
Alt Jtate Plane: Zone4
PBU: EOA: DS 15
15-45 As-Built
15-45 MWD
Measured Incl Drift Subsea TVD Course T O T A L
Depth Dir. Depth Length Rectangular Offsets
(fl) (deg.) (deg.) (ft) (ft) (ft) (ft) (fl)
GRID Coordinates
Northing Fasting
(ft) (ft)
0.00 0.00 0.00 -66.50 0.00 0.00 0.00N
117.90 0.31 315.50 51.40 117.90 117.90 0.23N
211.95 0.28 317.90 145.45 211.95 94.05 0.58N
0.00 E 5960952.49 676014.44
0.22rvV 5960952.72 676014.21
0.5ON 5960953.06 676013.87
Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Min Hor Dir. Vert
Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error
(ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/100ft) (deg) (ft) (ft) (ft) (ft) (deg.) (fl)
Survey Tool
0.0£@ 0.00 0.00 0.00 0.00 0.00 0.0 0.00N 0.00 E
0.32@315.50 0.30 0.26 0.00 0.26 0.3 0.23N 0.2z"W
0.8£@316.19 0.77 -0.03 2.55 0.03 0.3 0.58N 0.5C¢~
0.00 0.00 0.00 0.00 UNKNOWN
2.00 2.00 45.50 0.08 BPHM-PBD
2.00 2.00 47.00 0.22 BPHM-PBD
301.90 0.94 252.60 235.39 301.89 89.95 0.52N
391.81 1.66 266.20 325.28 391.78 89.91 0.22N
481.86 2.49 268.20 415.27 481.77 90.05 0.07N
1.41W 5960952.98 676013.02
3.41W 5960952.63 676011.03
6.65W 5960952.40 676007.77
1.5£@ 290.35 1. I 1 0.73 -72.60 0.96 1.2 0.52N 1.41W
3.42@273.61 1.76 0.80 15.13 0.87 2.0 0.21N 3.41W
6.67@270.58 3.12 0.92 2.22 0.93 2.8 0.05N 6.6 ~W~r
2.00
2.01
2.02
2.00 2.93 0.35 BPHM-PBD
2.00 359.04 0.49 BPHM-PBD
2.00 358.65 0.62 BPHM-PBD
571.30 4.95 268.80 504.51 571.01 89.44
661.41 6.73 266.80 594.15 660.65 90.11
750.61 8.46 269.50 682.57 749.07 89.20
'( ,3 9.11 270.20 771.63 838.13 90.12
929.59 10.45 277.70 859.20 925.70 88.86
1019.17 10.32 284.20 947.32 1013.82 89.58
0.07 S 12.45W 5960952.13 676001.98
0.45 S 21.6~W~r 5960951.54 675992.83
0.80S 33.41W 5960950.91 675981.06
0.83S 47.17W 5960950.56 675967.31
0.27N 62.19ff 5960951.31 675952.26
3.33N 78.02W 5960953.99 675936.37
12.47@269.66 5.66 2.75 0.67 2.75 5.3 0.13 S 12.47W 2.08
21.63@268.81 9.53 1.98 -2.22. 1.99 7.1 0.58 S 21.6a'W 2.22
33.42@268.63 14.63 1.94 3.03 1.98 8.8 1.05 S 33.4CVV 2.45
47.18@268.99 20.92 0.72 0.78 0.73 9.5 1.22 S 47. lt'W 2.78
62.19@270.25 28.80 1.51 8.44 2.08 11.3 0.29 S 62.21W 3.22
78.09@272.44 38.79 -0.15 7.26 1.32 12.5 2.60N 78.0~N 3.68
2.01 358.72 0.76 BPHM-PBD
2.03 357.95 0.89 BPHM-PBD
2.05 358.47 1.02 BPHM-PBD
2.09 358.93 1.16 BPHM-PBD
2.14 0.99 1.29 BPHM-PBD
2.21 3.48 1.43 BPHM-PBD
1113.74 10.83 290.10 1040.28 1106.78 94.57 8.46N 94.58W 5960958.74 675919.70 94.9~@275.11 50.95
1206.15 12.04 297.60 1130.86 1197.36 92.41 15.91N 111.28W 5960965.79 675902.83 112.41@278.14 65.24
1299.11 14.50 304.30 1221.34 1287.84 92.96 26.96N 129.4~qV 5960976.41 675884.37 132.2~@281.76 83.42
1391.98 15.08 310.30 1311.14 1377.64 92.87 41.33N 148.3ON 5960990.34 675865.22 153.9~@285.57 104.82
1484.53 14.84 311.40 1400.55 1467.05 92.55 56.95N 166.38W 5961005.53 675846.79 175.85@288.90 127.00
1576.70 ' 14.51 316.20 1489.72 1556.22 92.17 73.09N 183.22W 5961021.27 675829.57 197.2~@291.75 149.07
0.54 6.24
1.31 8.12
2.65 7.21
0.62
-0.26
-0.36
6.46
1.19
5.21
1.26 13.7 7.55N 94.7UN 4.22
2.07 15.6 14.81N lll.5ON 4.82
3.12 18.5 25.62N 129.88W 5.55
1.76 20.2 39.76N 148.8,cw 6.31
0.40 20.5 55.18N 167.1~v' 7.08
1.37 21.8 71.15N 184.1t'W 7.82
2.29 6.35 1.57 BPHM-PBD
2.38 9.72 1.71 BPHM-PBD
2.51 13.72 1.85 BPHM-PBD
2.65 17.56 1.99 BPHM-PBD
2.80 20.55 2.14 BPHM-PBD
2.96 23.32 2.28 BPHM-PBD
1669.82 14.94 318.10 1579.78 1646.28 93.12 90.45N 199.31W 5961038.24 675813.08 218.88@294.41 171.88
1763.76 ,16.09 321.70 1670.29 1736.79 93.94 109.68N 215.4TN 5961057.09 675796.48 241.78@296.98 196.38
'1855.36 15.93 325.20 1758.34 1824.84 91.60 129.96N 230.51W 5961077.02 675780.97 264.62@299.41 221.31
0.46
1.22
-0.17
2.04
3.83
3.82
0.69 22.4 88.33N 200.44W 8.60
1.60 23.9 107.39N 216.81W 9.44
1.07 24.9 127.54N 232.0_%V 10.25
3.13 25.84 2.43 BPHM-PBD
3.32 28.42 2.58 BPHM-PBD
3.50 30.76 2.72 BPHM-PBD
1947.42 16.90 330.00 1846.65 1913.15 92.06 151.93N 244.41W 5961098.65 675766.56 287.78@ 301.86 247.20
2040.74 17.05 333.90 1935.91 2002.41 93.32 175.96N 257.21W 5961122.37 675753.20 311.6,~@304.38 274.43
2133.95 18.78 337.20 2024.60 2091.10 93.21 202.06N 269.04W 5961148.19 675740.76 336.47@306.91 303.05
1.05
0.16
1.86
5.21
4.18
3.54
1.81 26.6 149.39N 246. It'W 11.08 3.70 33.24 2.87 BPHM-PBD
1.23 27.7 173.32N 259. l_%V 11.92 3.91 35.67 3.02 BPHM-PBD
2.15 29.7 199.34N 271.1,c~ 12.83 4.13 38.20 3.18 BPHM-PBD
Halliburton Energy Services - Drilling Systems PSL
Survey Report
Page 2
Date: 6/13/96
Wellpath ID: 15-45 MWD
Measured Incl Drift Subsea TVD Course T O T A L
Depth Dir. Depth Length Rectangular Offsets
(ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft)
GRID Coordinates
Northing Easting
(ft) (ft)
Closure Vertical Build Walk DLS Cum.
Dist. Dir. Section Rate Rate Dogleg
(ft) (deg.) (fi) (dg/100ft) (dg/100ft) (dg/100ft) (deg)
Expected Total Max Hot Min Hor Dir. Vert
Rectangular Coords Error Error Max Err Error
(ft) (ft) (ft) (ft) (deg.) (ft)
Survey Tool
2226.31 21.04 338.10 2111.44 2177.94 92.36 231.16N 280.99N 5961177.00 675728.14 363.85@309.44 334.38
2319.06 23.28 340.30 2197.33 2263.83 92.75 263.87N 293.38W 5961209.40 675714.99 394.58@311.97 369.13
2412.92 25.97 341.80 2282.65 2349.15 93.86 300.86N 306.0~ 5961246.09 675701.45 429.17@314.51 407.81
2.45 0.97
2.42 2.37
2.87 1.60
2.47 32.0 228.33N 283.3~cW 13.86
2.58 34.4 260.94N 296.0t3V 15.01
2.94 37.2 297.83N 309.0t~W 16.30
4.3~I 40.68 3.34 BPHM-PBD
4.66 43.19 3.51 BPHM-PBD
4.98 45.71 3.70 BPHM-PBD
2504.71 29.06 344.10 2364.05 2430.55 91.79 341.40N 318.44W 5961286.33 675688.12 466.8~@316.99 449.51
2596.19 29.86 345.80 2443.70 2510.20 91.48 384.85N 330.11W 5961329.48 675675.43 507.03@319.38 493.47
2690.34 31.12 344.30 2524.83 2591.33 94.15 430.99N 342.4~q~r 5961375.33 675662.03 550.48@321.53 540.12
3.37
0.87
1.34
2.51
1.86
-1.59
3.56 40.4 338.27N 321.8CW 17.72
1.26 41.6 381.63N 333.8CLV 19.16
1.56 43.1 427.66N 346.54W 20.76
5.32 48.20 3.91 BPHM-PBD
5.66 50.47 4.12 BPHM-PBD
6.04 52.45 4.35 BPHM-PBD
2785.66 31.25 344.10 2606.38 2672.88 95.32 478.48N 355.89W 5961422.49 675647.48 596.32@323.36 588.48
2876.34 31.17 345.20 2683.93 2750.43 90.68 523.79N 368.32W 5961467.49 675633.99 640.33@324.89 634.44
2970.30 31.25 346.80 2764.30 2830.80 93.96 571.03N 380.1C~ 5961514.44 675621.11 685.97@326.35 681.81
0.14
-0.09
0.09
-0.21
1.21
1.70
0.17 43.2 475.04N 360.39W 22.42
0.63 43.8 520.25N 373.1.cw 23.99
0.89 44.6 567.41N 385.31W 25.61
6.44 54.14 4.59 BPHM-PBD
6.82 55.60 4.83 BPHM-PBD
7.21 57.02 5.08 BPHM-PBD
~", 2 31.86 344.10 2844.67 2911.17 94.32 618.80N 392.51W 5961561.90 675607.59 732.78@327.61 729.94
3D~.71 32.20 344.80 2921.90 2988.40 91.09 665.34N 405.4c%V 5961608.12 675593.56 779.15@328.64 777.23
3249.90 32.37 343.40 3001.53 3068.03 94.19 713.72N 419.24W 5961656.16 675578.65 827.74@329.57 826.54
0.65
0.37
0.18
-2.86
0.77
-1.49
1.63 46.2 615.05N 398.14W 27.32
0.55 46.7 661.49N 411.4~cW 28.99
0.81 47.4 709.73N 425.7_%V 30.75
7.62 58.13 5.34 BPHM-PBD
8.02 59.12 5.59 BPHM-PBD
8.45 59.97 5.86 BPHM-PBD
3341.54 32.21 343.30 3078.99 3145.49 91.64 760.62N 433.2T~ 5961702.72 675563.53 875.37@330.33 874.64
3434.16 32.36 344.20 3157.30 3223.80 92.62 808.11N 447.11W 5961749.88 675548.58 923.5C@331.05 923.19
3529.25 33.20 342.00 3237.25 3303.75 95.09 857.36N 462.0~V 5961798.76 675532.46 973.9C@331.68 973.81
-0.17
0.16
0.88
-0.11
0.97
-2.31
0.18 47.6 756.50N 440. l~cW 32.47
0.54 48.1 803.88N 454.4CVV 34.21
1.53 49.6 852.96N 469.94W 36.07
8.86 60.69 6.13 BPHM-PBD
9.28 61.39 6.40 BPHM-PBD
9.73 61.95 6.69 BPHM-PBD
3621.37 33.88 342.50 3314.03 3380.53 92.12 905.84N 477.6CN 5961846.85 675515.82 1024.03@332.20 1024.00
3714.94 33.03 342.00 3392.09 3458.59 93.57' 954.97N 493.32W 5961895.60 675498.95 1074.8~@332.68 1074.86
3774.51 33.01 341.80 3442.04 3508.54 59.57 985.82N 503.41W 5961926.21 675488.15 1106.92@332.95 1106.90
0.74
-0.91
-0.03
0.54
-0.53
-0.34
0.80 50.3 901.28N 485.9~ 37.90 10.16 62.47 6.99 BPHM-PBD
0.95 51.2 950.24N 502.1~ 39.73 10.60 62.91 7.27 BPHM-PBD
0.19 51.3 980.99N 512.5~cW 40.89 10.88 63.17 7.46 BPHM-PBD
3870.67 32.62 340.30 3522.86 3589.36 96.16 1035.11N 520.3~W~r 5961975.08 675470.08 1158.53@333.31 1158.45
3964.48 32.23 339.90 3602.04 3668.54 93.81 I082.40N 537.4~qV 5962021.96 675451.86 1208.49@333.59 1208.33
4057.42 32.47 342.60 3680.56 3747.06 92.94 1129.49N 553.4~ 5962068.66 675434.79 1257.78@333.90 1257.49
-0.41
-0.42
0.26
-1.56
-0.43
2.91
0.94 52.2 1030.08N 530.0_qV 42.77 11.33 63.49 7.76 BPHM-PBD
0.47 52.7 1077.19N 547.7C¢/ 44.59 11.77 63.75 8.04 BPHM-PBD
1.58 54.1 1124.12N 564.1~N 46.38 12.20 64.10 8.33 BPHM-PBD
4150.97 32.49 342.40 3759.48 3825.98 93.55 1177.40N 568.53W 5962116.20 675418.57 1307.48@334.23 1306.99
4245.54 32.25 342.50 3839.35 3905.85 94.57 1225.67N 583.8UN 5962164.10 675402.18 1357.61@334.53 1356.88
4339.62 32.10 342.80 3918.99 3985.49 94.08 1273.49N 598.74W 5962211.55 675386.13 1407.22@334.82 1406.22
0.02
-0.25
-0.16
-0.21
0.11
0.32
0.12 54.2 1171.88N 579.7~W~r .48.18 12.64 64.41 8.62 BPHM-PBD
0.26 54.5 1220.01N 595.4C¢/ 49.99 13.09 64.71 8.91 BPHM-PBD
0.23 54.7 1267.69N 610.8CN 51.78 13.53 64.99 9.20 BPHM-PBD
44~' 7.5 31.76 341.70 3998.45 4064.95 93.63 1320.65N 613.8~3/ 5962258.35 675369.94 1456.33@335.07 1455.05
6 32.66 344.00 4077.57 4144.07 93.51 1368.27N 628.57N 5962305.61 675354.15 1505.72@335.33 1504.09
462u.31 32.80 344.00 4156.27 4222.77 93.55 1416.90N 642.4c%V 5962353.89 675339.08 1555.75@335.61 1553.69
-0.36
0.96
0.15
-1.17
2.46
0.00
0.72 55.4 1314.69N 626.4.W~r 53.56 13.96 65.21 9.49 BPHM-PBD
1.63 56.9 1362.19N 641.5-q~r 55.36 14.40 65.50 9.79 BPHM-PBD
0.15 57.0 1410.68N 655.94W 57.17 14.85 65.77 10.08 BPHM-PBD
4713.52 32.69 344.00 4234.67 4301.17 93.21 1465.36N 656.3~q~r 5962402.01 675324.05 1605.64@335.87 1603.12
4806.37 32.54 344.10 4312.87 4379.37 92.85 1513.48N 670.11W 5962449.79 675309.18 1655.19@336.12' 1652.18
4901.20 32.48 343.40 4392.84 4459.34 94.83 1562.41N 684.3TN 5962498.37 675293.78 1705.72@336.35 1702.19
-0.12
-0.16
-0.06
0.00
0.11
-0.74
0.12 57.1 1459.02N 670.2~W~r 58.96 15.29 66.03 10.38 BPHM-PBD
0.17 57.3 1507.01N 684.4COV 60.75 15.73 66.27 10.68 BPHM-PBD
0.40 57.7 1555.81N 699.1~ 62.57 16.18 66.48 10.98 BPHM-PBD
4994.46 32.57 343.40 4471.48 4537.98 93.26 1610.46N 698.69W 5962546.08 675278.34 1755.49@336.55 1751.46
5089.12 32.10 344.90 4551.46 4617.96 94.66 1659.16N 712.5~ 5962594.44 675263.38 1805.69@336.76 1801.07
5182.09 31.80 344.20 4630.35 4696.85 92.97 1706.58N 725.6~W~r 5962641.54 675249.17 1854.44@336.97 1849.21
0.10
-0.50
-0.32
0.00
1.58
-0.75
0. I0 57.8 1603.73N 713.9_%V 64.37 16.62 66.67 11.27 BPHM-PBD
0.98 58.7 1652.32N 728.2C~ 66.16 17.06 66.90 11.57 BPHM-PBD
0.51 59.2 1699.62N 741.71W 67.91 17.50 67.09 11.86 BPHM-PBD
5276.57 33.02 344.60 4710.11 4776.61 94.48 1755.35N 739.24W 5962689.98 675234.42 1904.67@337.16 1898.79
5369.34 34.12 341.20 4787.41 4853.91 92.77 1804.36N 754.34W 5962738.61 675218.18 1955.7£@337.31 1949.26
5462.16 34.38 341.10 4864.13 4930.63 92.82 1853.80N 771.22W 5962787.64 675200.16 2007.82@337.41 2000.93
,
5554.79 34.55 341.20 4940.50 5007.00 92.63 1903.41N 788.1~ 5962836.84 675182.07 2060.13@337.51 2052.77
5649.60 34.95 341.80 5018.40 5084.90 94.81 1954.65N 805.3CW 5962887.67 675163.73 2114.04@337.61 2106.17
5741.62 35.24 341.80 5093.70 5160.20 92.02 2004.91N 821.8~t 5962937.52 675146.04 2166.81@337.71 2158.40
1.29
1.19
0.28
0.18
0.42
0.32
0.42
-3.66
-0.11
0.11
0.63
0.00
1.31 60.4 1748.27N 755.7~'W 69.74 17.95 67.29 12.17 BPHM-PBD
2.35 62.6 1797.09N 771.41W 71.64 18.40 67.39 12.49 BPHM-PBD
0.29 62.9 1846.34N 788.8qW 73.56 18.86 67.49 12.81 BPHM-PBD
0.19 63.0 1895.76N 806.3-%V 75.48 19.31 67.58 13.13 BPHM-PBD
0.56 63.6 1946.82N 824.04W 77.45 19.78 67.69 13.47 BPHM-PBD
0.32 63.9 1996.90N 841.12W 79.39 2(}.24 67.79 13.79 BPHM-PBD
Halliburton Energy Services - Drilling Systems PSL
Survey Report
Page 3
Date: 6/13/96
Wellpath ID: 15-45 MWD
Measured Incl Drift Subsea TVD Course T O T A L
Depth Dir. Depth Length Rectangular Offsets
(ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft)
GRID Coordinates
Northing Easting
(ft) (ft)
Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Min Hor Dir. Vert
Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error
(ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/10Oft) (deg) (ft) (ft) (ft) (ft) (deg.) (ft)
5834.40 34.25 341.80 5169.93 5236.43 92.78 2055.14N 838.34W 5962987.35 675128.36 2219.5{@337.81 2210.61 -1.07 0.00
5927.83 33.49 341.60 5247.51 5314.01 93.43 2104.58N 854.6gW 5963036.39 675110.87 2271.51@337.90 2262.03 -0.81 -0.21
5991.11 34.37 341.40 5300.01 5366.51 63.28 2138.08N 865.9CW 5963069.62 675098.88 2306.7~@337.95 2296.93 1.39 -0.32
6052.71 34.17 341.90 5350.92 5417.42 61.60 2171.00N 876.82rvV 5963102.27 675087.20 2341.38@338.01 2331.19 -0.32 0.81
6145.76 34.24 341.10 5427.87 5494.37 93.05 2220.60N 893.42W 5963151.47 675069.45 2393.5¢@338.08 2382.88 0.08 -0.86
6238.66 34.36 341.60 5504.62 5571.12 92.90 2270.20N 910.1EW 5963200.67 675051.56 2445.8~@338.15 2434.63 0.13 0.54
6333.48 32.60 342.70 5583.70 5650.20 94.82 2319.99N 926.2CW 5963250.06 675034.36 2498.04@338.24 2486.22 -1.86 1.16
6427.87 31.67 341.80 5663.63 5730.13 94.39 2367.80N 941.5CW 5963297.50 675017.95 2548.12@338.32 2535.72 -0.99 -0.95
6521.45 31.97 341.30 5743.15 5809.65 93.58 2414.61N 957.12W 5963343.93 675001.25 2597.38@338.38 2584.47 0.32 -0.53
6 ,6 31.99 341.20 5823.74 5890.24 95.01 2462.26N 973.29N 5963391.18 674983.97 2647.64@338.43 2634.23 0.02 -0.11
6708.86 31.90 340.00 5902.14 5968.64 92.40 2508.37N 989.5~W~r 5963436.90 674966.66 2696.4~@338.47 2682.64 -0.10 -1.30
6802.39 31.90 339.60 5981.55 6048.05 93.53 2554.75N 1006.6UN 5963482.87 674948.52 2745.91@338.50 2731.69 0.00 -0.43
6895.33 31.67 339.80 6060.55 6127.05 92.94 2600.67N 1023.58W 5963528.38 674930.47 2794.85@338.52 2780.27 -0.25 0.22
6989.15 31.46 342.40 6140.49 6206.99 93.82 2647.12N 1039.49N 5963574.44 674913.49 2843.9£@338.56 2828.84 -0.22 2.77
7082.17 30.75 342.60 6220.14 6286.64 93.02 2692.95N 1053.94W 5963619.92 674897.97 2891.84@338.63 2876.19 -0.76 0.22
7176.96 30.36 342.60 6301.77 6368.27 94.79 2738.93N 1068.3~%V 5963665.55 674882.50 2939.92@338.69 2923.65 -0.41 0.00
7268.05 29.69 343.10 6380.63 6447.13 91.09 2782.48N I081.79W 5963708.78 674868.04 2985.38@338.75 2968.51 -0.74 0.55
7362.14 26.65 344.40 6463.57 6530.07 94.09 2825.11N 1094.24W 5963751.10 674854.60 3029.63@338.83 3012.10 -3.23 1.38
7455.45 26.41 344.00 6547.05 6613.55 93.31 2865.22N 1105.59W 5963790.93 674842.32 3071.12@338.90 3052.94 -0.26 -0.43
7549.97 26.19 342.00 6631.79 6698.29 94.52 2905.26N 1117.8~ 5963830.68 674829.16 3112.8~@338.96 3094.13 -0.23 -2.12
7641.62 25.46 342.30 6714.29 6780.79 91.65 2943.26N I130.0TN 5963868.38 674816.04 3152.7~@339.00 3133.51 -0.80 0.33
7734.34 24.32 343.50 6798.39 6864.89 92.72 2980.56N I141.5~%V 5963905.39 674803.69 3191.6~@339.04 3171.91 -1.23 1.29
7827.69 23.52 343.90 6883.72 6950.22 93.35 3016.89N 1152.18W 5963941.46 674792.22 3229.41@339.10 3209.06 -0.86 0.43
7922.19 23.21 343.90 6970.48 7036.98 94.50 3052.89N 1162.57W 5963977.22 674780.99 3266.7~@339.15 3245.82 -0.33 0.00
I!a3 22.80 344.20 7056.21 7122.71 93.14 3087.89N 1172.58W 5964011.97 674770.18 3303.03@339.21 3281.50 -0.44 0.32
, 6 22.52 343.60 7142.43 7208.93 93.43 3122.47N 1182.503/ 5964046.31 674759.40 3338.9£@339.26 3316.81 -0.30 -0.64
8202.39 22.13 344.20 7229.04 7295.54 93.63 3156.64N 1192.42~ 5964080.24 674748.74 3374.3~@339.31 3351.69 -0.42 0.64
8295.39 21.37 344.70 7315.42 7381.92 93.00 3189.84N 1201.6tW 5964113.21 674738.73 3408.68@339.36 3385.43 -0.82 0.54
8387.54 20.74 344.10 7401.41 7467.91 92.15 3221.73N 1210.5c%V 5964144.88 674729.09 3441.6{@339.41 ' 3417.84 -0.68 -0.65
8479.80 19.77 342.30 7487.97 7554.47 92.26 3252.31N 1219.78W 5964175.23 674719.16 3473.52@339.44 3449.23 -1.05 -1.95
8574.73 19.92 342.50 7577.26 7643.76 94.93 3283.03N 1229.5~ 5964205.71 674708.71 3505.71@339.47 3481.00 0.16 0.21
8668.54 20.74 344.90 7665.23 7731.73 93.81 3314.30N 1238.6ON 5964236.77 674698.85 3538.2£@339.51 3512.98 0.87 2.56
8761.71 19.79 347.80 7752.63 7819.13 93.17 3345.65N 1246.29N 5964267.93 674690.49 3570.24@339.57 3544.32 -1.02 3.11
8855.76 19.24 347.00 7841.28 7907.78 94.05 3376.31N 1253.14W 5964298.42 674682.93 3601.37@339.64 3574.71 -0.58 -0.85
8947.96 19.69 346.80 7928.21 7994.71 92.20 3406.23N 1260.1C~V 5964328.17 674675.27 3631.84@339.70 3604.49 0.49 -0.22
9041.00 .19.86 347.40 8015.76 8082.26 93.04 3436.92N 1267.L~r 5964358.68 674667.53 3663.0{@339.76 3634.97 0.18 0.64
9133.88 19.15 347.70 8103.31 8169.81 92.88 3467.20N 1273.82W 5964388.80 674660.14 3693.79@339.83 3664.94 -0.76 0.32
9180.19 18.77 348.30 8147.11 8213.61 46.31 3481.92N 1276.9~q~r 5964403.44 674656.67 3708.62@339.86 3679.45 -0.82 1.30
9255.27 19.44 347.14 8218.05 8284.55 75.08 3505.93N 1282.18'W 5964427.32 674650.88 3733.03@339.91 3703.18 0.89 -1.55
Survey Tool
1.07 64.9 2046.95N 858.1~'W 81.29 20.70 67.88 14.11 BPHM-PBD
0.82 65.6 2096.22N 875.04W 83.17 21.15 67.97 14.43 BPHM-PBD
1.40 66.5 2129.59N 886.6~%V 84.47 21.46 68.02 14.65 BPHM-PBD
0.56 66.9 2162.40N 897.8~cW 85.73 21.76 68.08 14.86 BPHM-PBD
0.49 67.3 2211.81N 915.04W 87.64 22.22 68.14 15.18 BPHM-PBD
0.33 67.6 2261.23N 932.3~W 89.56 22.68 68.22 15.51 BPHM-PBD
1.96 69.5 2310.87N 948.8~r 91.40 23.13 68.31 15.81 BPHM-PBD
1.11 70.5 2358.53N 964.6~W~r 93.20 23.58 68.38 16.11 BPHM-PBD
0;43 70.9 2405.17N 980.7~"W 95.00 24.02 68.43 16.40 BPHM-PBD
0.06 71.0 2452.65N 997.3~cw 96.83 24.48 68.49 16.70 BPHM-PBD
0.69 71.6 2498.57N 1014.14W 98.62 24.92 68.51 17.00 BPHM-PBD
0.23 71.8 2544.76N 1031.7~W~r 100.43 25.36 68.53 17.29 BPHM-PBD
0.27 72.1 2590.49N 1049.21W 102.21 25.80 68.55 17.58 BPHM-PBD
1.47 73.5 2636.80N 1065.5t'W 103.98 26.24 68.62 17.87 BPHM-PBD
0.77 74.2 2682.50N 1080.4,%V 105.70 26.67 68.68 18.15 BPHM-PBD
0.41 74.6 2728.35N 1095.28W 107.42 27.11 68.75 18.43 BPHM-PBD
0.79 75.3 2771.79N 1109.1C¢1 109.04 27.53 68.81 18.70 BPHM-PBD
3.30 78.4 2814.33N 1121.8_%V 110.54 27.93 68.89 18.93 BPHM-PBD
0.32 78.7 2854.35N 1133.5C¢1 112.01 28.32 68.96 19.16 BPHM-PBD
0.97 79.6 2894.29N 1146.0~W~r 113.50 28.71 69.00 19.39 BPHM-PBD
0.81 80.3 2932.19N I158.61W 114.91 29.09 69.04 19.60 BPHM-PBD
1.34 81.6 2969.41N 1170.3_*N 116.26 29.46 69.09 19.81 BPHM-PBD
0.87 82.4 3005.67N 1181.2~W~r 117.58 29.82 69.14 20.01 BPHM-PBD
0.33 82.7 3041.61N 1191.85W 118.89 30.18 69.19 20.20 BPHM-PBD
0.46 83.1 3076.54N 1202.0901 120.17 30.53 69.25 20.40 BPHM-PBD
0,39 83.5 3111.06N 1212.2tW 121.43 30.88 69.29 20.59 BPHM-PBD
0.48 84.0 3145.17N 1222.3ON 122.67 31.23 69.34 20.77 BPHM-PBD
0.84 84.7 3178.32N 1231.7~cW 123.86 31.56 69.39 20.95 BPHM-PBD
0.72 85.4 3210.15N 1240.8~W 125.01 31.88 69.44 21.12 BPHM-PBD
1.25 86.6 3240.67N 1250.2~cW 126.11 32.20 69.46 21.28 BPHM-PBD
0.17 86.7 3271.32N 1260.2z~N 127.25 32.52 69.49 21.45 BPHM-PBD
1.25 87.9 3302.55N 1269.54W 128.41 32.84 69.54 21.63 BPHM-PBD
1.48 89.3 3333.87N 1277.3(W 129.50 33.16 69.61 21.79 BPHM-PBD
0.65 89.9 3364.50N 1284.2~cW 130.57 33.46 69.67 21.95 BPHM-PBD
0.49 90.3 3394.39N 1291.4C¢/ 131.65 33.77 69.73 22.11 BPHM-PBD
0.28 90.6 3425.04N 1298.5~ 132.75 34.08 69.79 22.28 BPHM-PBD
0.77 91.3 3455.30N 1305.3tW 133.80 34.39 69.85 22.44 BPHM-PBD
0.92 91.7 3470.00N 1308.57N 134.31 34.54 69.88 22.52 BPHM-PBD
1.03 92.5 3493.99N 1313.91W 135.18 34.78 69.93 22.65 BPHM-PBD
Halliburton Energy Services - Drilling Systems PSL
Survey Report
Page 4
Date: 6/13/96
Wellpath ID: 15-45 MWD
Measured Incl Drift Subsea TVD Course T O T A L
Depth Dir. Depth Length Rectangular Offsets
(fi) (deg.) (deg.) (ft) (ft) (ft) fit) (ft)
GRID Coordinates
Northing Fasting
(fi) (fi)
Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Min Hor Dir. Vert
Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error
(fi) (deg.) (fi) (dg/100ft) (dg/10Ofi) (dg/100ft) (deg) (ft) (ft) (fi) (fi) (deg.) (ft)
9285.56 19.72 346.70 8246.59 8313.09 30.29 3515.81N 1284.4t'/W 5964437.15 674648.35 3743.1£@339.93 3713.02 0.92 -1.45
9381.15 19.47 348.20 8336.65 8403.15 95.59 3547.10N 1291.44W 5964468.26 674640.66 3774.8g@339.99 3744.01 -0.26 1.57
9475.82 18.45 346.40 8426.18 8492.68 94.67 3577.11N 1298.15W 5964498.10 674633.21 3805.3g@340.05 3773.77 -1.08 -1.90
9507.38 17.83 346.30 8456.17 8522.67 31.56 3586.66N 1300.51W 5964507.59 674630.67 3815.1~@340.07 3783.31 -1.96 -0.32
9533.54 17.01 345.40 8481.13 8547.63 26.16 3594.25N 1302.47N 5964515.14 674628.59 3822.95@340.08 3790.94 -3.13 -3.44
Survey Tool
1.04 92.8 3503.86N 1316.2_qZ~r 135.53 34.88 69.95 22.70 BPHM-PBD
0.59 93.4 3535.12N 1323.35W 136.63 35.20 70.01 22.87 BPHM-PBD
1.24 94.6 3565.10N 1330.2_%V 137.67 35.50 70.06 23.02 BPHM-PBD
1.97 95.2 3574.63N 1332.5~cw 138.01 35.60 70.08 23.07 BPHM-PBD
3.30 96.1 3582.22N 1334.5~r 138.27 35.67 70.09 23.11 BPHM-PBD
9565.31 20.07 333.50 8511.26 8577.76 31.77 3603.63N 1306.03W 5964524.43 674624.76 3833.0£@340.08 3800.93 9.63 -37.46 15.27 100.9 3591.56N 1338.2_~V 138.66 35.78 70.07 23.17 BPHM-PBD
9597.41 24.80 332.60 8540.92 8607.42 32.10 3614.54N 1311.5533/ 5964535.21 674618.95 3845.15@340.06 3813.17 14.73 -2.80 14.77 105.6 3602.40N 1343.9_%V 139.15 35.90 70.04 23.26 BPHM-PBD
9629.18 30.22 335.70 8569.09 8635.59 31.77 3627.76N 1317.9~qX/ 5964548.27 674612.29 3859.74@340.03 3827.83 17.06 9.76 17.64 111.2 3615.52N 1350.4tW 139.74 36.04 70.02 23.36 BPHM-PBD
9660.94 35.54 338.40 8595.75 8662.25 31.76 3643.64N 1324.640/ 5964563.99 674605.23 3876.95@340.02 3845.01 16.75 8.50 1'/.37 116.8 3631.32N 1357.4CXV 140.43 36.20 70.02 23.49 BPHM-PBD
~. .04 40.10 342.40 8620.79 8687.29 31.70 3661.95N 1331.12a3er 5964582.14 674598.32 3896.38@340.02 3864.25 14.39 12.62 16.33 121.9 3649.55N 1364.11W 141.18 36.35 70.03 23.63 BPHM-PBD
9724.58 45.30 344.70 8644.26 8710.76 31.94 3682.72N 1337.24W 5964602.77 674591.73 3917.98@340.04 3885.51 16.28 7.20 16.99 127.4 3670.25N 1370.4/'W 142.01 36.52 70.06 23.80 BPHM-PBD
9755.68 50.80 346.90 8665.04 8731.54 31.10 3705.13N 1342.85W 5964625.04 674585.56 3940.98@340.08 3908.02 17.69 7.07 18.45 133.1 3692.61N 1376.3~r 142.88 36.67 70.10 24.00 BPHM-PBD
9788.19 56.10 351.90 8684.41 8750.91 32.51 3730.79N 1347.6~qV 5964650.58 674580.20 3966.73@340.14 3933.00 16.30 15.38 20.45 139.8 3718.24N 1381.3.~N 143.82 36.82 70.18 24.22 BPHM-PBD
9819.83 63.15 351.90 8700.39 8766.89 31.64 3757.80N 1351.45W 5964677.49 674575.73 3993.44@340.22 3958.75 22.28 0.00 22.28 146.8 3745.22N 1385.%W 144.81 36.95 70.27 24.47 BPHM-PBD
9851.51 71.79 352.10 8712.52 8779.02 31.68 3786.75N 1355.5tq~r 5964706.33 674570.99 4022.0~@340.30 3986.34 27.27 0.63 27.28 155.4 3774.13N 1389.65W 145.86 37.04 70.36 24.74 BPHM-PBD
9883.51 80.40 351.90 8720.20 8786.70 32.00 3817.48N 1359.88W 5964736.95 674565.95 4052.4~@340.39 4015.62 26.91 -0.63 26.91 164.1 3804.83N 1394.28W 146.97 37.10 70.45 25.03 BPHM-PBD
9915.28 88.77 352.40 8723.20 8789.70 31.77 3848.78N 1364.15W 5964768.15 674560.91 4083.4£@340.48 4045.41 26.35 1.57 26.39 172.4 3836.10N 1398.8-%V 148.08 37.11 70.55 25.32 BPHM-PBD
9947.03 89.23 352.80 8723.75 8790.25 31.75 3880.26N 1368.28W 5964799.52 674556.09 4114.44@340.58 4075.25 1.45 1.26 1.92 173.1 3867.55N 1403.1gN 149.19 37.12 70.64 25.60 BPHM-PBD
9978.69 90.40 353.30 8723.85 8790.35 31.66 3911.69N 1372.11W 5964830.85 674551.53 4145.3~@340.67 4104.93 3.70 1.58 4.02 174.3 3898.95N 1407.2JW 150.29 37.13 70.74 25.89 BPHM-PBD
10010.41 92.56 354.60 8723.04 8789.54 31.72 3943.22N 1375.4CN 5964862.29 674547.45 4176.22@340.77 4134.47 6.81 4.10 7.95 176.8 3930.46N 1410.7_q/v' 151.38 37.15 70.85 26.18 BPHM-PBD
10042.11 93.23 353.40 8721.43 8787.93 31.70 3974.70N 1378.7TN 5964893.69 674543.41 4207.05@340.87 4163.96 2.11 -3.79 4.33 178.2 3961.92N 1414.2gN 152.47 37.18 70.95 26.46 BPHM-PBD
10073.80 92.00 348.00 8719.99 8786.49 31.69 4005.93N 1383.88W 5964924.79 674537.57 4238.23@340.94 4194.05 -3.88 -17.04 17.46 183.8 3993.06N 1419.7~cW 153.64 37.19 71.00 26.75 BPHM-PBD
10105.53 90.95 343.90 8719.17 8785.67 31.73 4036.70N 1391.58W 5964955.36 674529.16 4269.83@340.98 4224.91 -3.31 -12.92 13.33 188.0 4023.68N 1428.01W 154.84 37.20 71.02 27.04 BPHM-PBD
10137.23 90.25 338.90 8718.84 8785.34 31.70 4066.73N 1401.65W 5964985.15 674518.36 4301.51@340.98 4256.23 -2.21 -15.77 15.93 193.0 4053.46N 1438.7COV 156.09 37.21 71.00 27.33 BPHM-PBD
lq '9 88.70 335.20 8719.13 8785.63 32.16 4096.33N 1414.22W 5965014.46 674505.14 4333.5~@340.95 4288.29 -4.82 -11.51 12.47 197.0 4082.72N 1452.0-q~r 157.37 37.23 70.95 27.63 BPHM-PBD
16~. .14 88.61 333.40 8719.88 8786.38 31.75 4124.94N 1427.95W 5965042.73 674490.71 4365.12@340.90 4320.02 -0.28 -5.67 5.67 198.8 4110.93N 1466.5~cW 158.66 37.25 70.89 27.92 BPHM-PBD
10232.93 89.48 327.80 8720.41 8786.91 31.79 4152.62N 1443.58W 5965070.04 674474.48 4396.38@340.83 4351.77 2.74 -17.62 17.82 204.5 4138.06N 1483.0CVV 159.96 37.27 70.77 28.21 BPHM-PBD
10264.60 91.20 323.30 8720.22 8786.72 31.67 4178.72N 1461.49vV 5965095.72 674455.97 4426.93@340.72. 4383.18 5.43 -14.21 15.21 209.3 4163.48N 1501.9(W 161.27 37.29 70.61 28.51 BPHM-PBD
10296.33 90.68 318.30 8719.70 8786.20 31.73 4203.30N 1481.54W 5965119.82 674435.37 4456.7~@340.58 4414.22 -1.64 -15.76 15.84 214.4 4187.20N 1522.91W 162.58 37.32 70.41 28.80 BPHM-PBD
10328.09 89.29 312.60 8719.71 8786.21 31.76 4225.92N 1503.81W 5965141.92 674412.58 4485.52@340.41 4444.55 -4.38 -17.95 18.47 220.2 4208.77N 1546.14W 163.87 37.36 70.15 29.10 BPHM-PBD
10359.93 88.98 307.60 8720.19 8786.69 31.84 4246.42N 1528.103/ 5965161.85 674387.77 4513.02@340.21 4473.94 -0.97 -15.70 15.73 225.2 4228.05N 1571.4.W4 165.13 37.42 69.85 29.40 BPHM-PBD
10391.59 90.18 302.20 8720.42 8786.92 31.66 4264.53N 1554.11W 5965179.35 674361.41 4538.8~@339.98 4501.94 3.79 -17.06 17.47 230.8 4244.77N 1598.203/ 166.35 37.49 69.51 29.69 BPHM-PBD
10423.30 91.76 297.40 8719.88 8786.38 31.71 4280.28N 1581.61W 5965194.46 674333.56 4563.15@339.72 4528.56 4.98 -15.14 15.93 235.8 4259.00N 1626.5_%V 167.51 37.60 69.12 29.99 BPHM-PBD
10455.15 92.90 292.70 8718.59 8785.09 31.85 4293.75N 1610.44vV 5965207.25 674304.44 4585.83@339.44 4553.77 3.58 -14.76 15.17 240.6 4270.82N 1656.0t'W 168.61 37.74 68.70 30.29 BPHM-PBD
10486.74 92.34 287.60 8717.14 8783.64 31.59 4304.62N 1640.0~qV 5965217.43 674274.59 4606.47@339.14 4577.02 -1.77 -16.14 16.22 245.8 4279.94N 1686.2-W~r 169.62 37.92 68.25 30.59 BPHM-PBD
1~0518.56 '91.48 282.50 8716.08 8782.58 31.82 4312.88N 1670.7~qV 5965224.97 674243.72 4625.18@338.82 4598.45 -2.70 -16.03 16.25 250.9 4286.34N 1717.34W 170.55 38.14 67.76 30.89 BPHM-PBD
10550.43 90.35 277.50 8715.57 8782.07 31.87 4318.41N 1702.12W 5965229.77 674212.23 4641.75@338.49 4617.77 -3.55 -15.69 16.08' 256.1 4289.96N 1748.9/'W 171.38 38.41 67.24 31.19 BPHM-PBD
10582.22 89.44 271.90 8715.63 8782.13 31.79 4321.01N 1733.75W 5965231.64 674180.52 4655.88@338.14 4634.63 -2.86 -17.62 17.85 261.7 4290.62N 1780.7ON 172.08 31t.73 66.70 31.50 BPHM-PBD
10614.01 89.20 266.40 8716.01 8782.51 31.79 4320.54N 1765.5TN 5965230.43 674148.78 4667.3~@337.77 4648.80 -0.75 - -17.30 17.32 267.2 4288.22N 1812.3_%V 172.65 39.11 66.14 31.80 BPHM-PBD
Halliburton Energy Services - Drilling Systems PSL
Survey Report
Page 5
Date: 6/13/96
Wellpath ID: 15-45 MWD
Measured Incl Drift Subsea TVD Course T O T A L
Depth Dir. Depth Length Rectangular Offsets
(fl) (deg.) (deg.) (fl) (fi) (ft) (fl) (ft)
GRID Coordinates
Northing Easting
(ft) (ft)
Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Min Hor Dir. Vert
Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error
(ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/100ft) (deg) (ft) (ft) (fl) (ft) (deg.) (ft)
Survey Tool
10645.54 90.46 262.50 8716.10 8782.60 31.53 4317.49N 1796.94W 5965226.66 674117.50 4676.51@337.40 4660.50
10676.53 92.40 262.50 8715.33 8781.83 30.99 4313.45N 1827.6C'W 5965221.90 674086.90 4684.67@337.04 4671.02
10690.10 93.50 263.50 8714.63 8781.13 13.57 4311.80N 1841.11W 5965219.94 674073.49 4688.42@336.88 4675.73
4.00 -12.37 13.00 271.3 4283.27N 1843.48W 173.12 39.52 65.58 32.10 BPHM-PBD
6.26 0.00 6.26 273.3 4277.37N 1873.9_q/v' 173.61 39.96 65.02 32.40 BPHM-PBD
8.11 7.37 10.95 274.8 4274.91N 1887.31W 173.84 40.16 64.78 32.52 BPHM-PBD
10721.90 94.18 261.70 8712.50 8779.00 31.80 4307.71N 1872.5TN 5965215.13 674042.14 4697.11@336.51 4686.55 2.14 -5.66
10754.21 92.68 262.54 8710.57 8777.07 32.31 4303.29N 1904.52W 5965209.97 674010.32 4705.9£@336.13 4697.29 -4.64 2.60
10785.40 91.30 263.80 8709.49 8775.99 31.19 4299.58N 1935.4C'W 5965205.54 673979.48 4715.D@335.77 4708.21 -4.42 4.04
6.04 276.7 4268.93N 1918.4.cw 174.33 40.67 64.21 32.83 BPHM-PBD
5.32 278.4 4262.57N 1950.1.cw 174.88 41.21 63.63 33.14 BPHM-PBD
5.99 280.3 4256.98N 1980.9.Wg 175.46 41.76 63.08 33.44 BPHM-PBD
10817.16 90.31 262.59 8709.04 8775.54 31.76 4295.82N 1967.00N 5965201.05 673948.05 472.4.74@335.40 4719.35 -3.12 -3.81
10849.18 90.40 264.77 8708.84 8775.34 32.02 4292.29N 1998.82W 5965196.79 673916.33 4734.88@335.03 4730.83 0.28 6.81
10878.52 89.87 264.46 8708.77 8775.27 29.34 4289.54N 2028.0~31 5965193.36 673887.20 4744.7~@334.70 4741.80 -1.81 -1.06
10'. · 89.43 265.61 8708.97 8775.47 31.99 4286.77N 2059.90N 5965189.86 673855.42 4756.01@334.33 4753.98 -1.38 3.59
10943.05 88.20 265.10 8709.64 8776.14 32.54 4284.14N 2092.32W 5965186.48 673823.08 4767.77@333.97 4766.53 -3.78 -1.57
10975.87 86.09 263.99 8711.27 8777.77 32.82 4281.02N 2124.9~ 5965182.61 673790.54 4779.3g@333.60 4778.75 -6.43 -3.38
4.92 281.8 4251.31N 2012.21W 176.04 42.35 62.51 33.75 BPHM-PBD
6.81 284.0 4245.85N 2043.St'W 176.70 42.97 61.94 34.05 BPHM-PBD
2.'09 284.6 4241.32N 2072.9CW 177.31 43.55 61.42 34.34 BPHM-PBD
3.85 285.9 4236.61N 2104.6z"'W 178.03 44.21 60.85 34.65 BPHM-PBD
4.09 287.2 4232.00N 2136.87W 178.76 44.90 60.27 34.96 BPHM-PBD
7.26 289.6 4226.91N 2169.2.c~ 179.49 45.61 59.69 35.28 BPHM-PBD
11020.28 85.82 263.46 8714.41 8780.91 44.41 4276.18N 2168.99W 5965176.75 673746.65 4794.81@333.10 4794.67 -0.61 -1.19
11060.00 85.82 263.00 8717.30 8783.80 39.72 4271.51N 2208.32W 5965171.17 673707.44 4808.5~@332.66 4808.59 0.00 -1.16
1.34 290.2 4219.41N 2213.0z'~N 180.48 46.61 58.90 35.71 BPHM-PBD
1.16 290.6 4207.94N 2251.5_Wq 182.10 49.95 57.57 37.02 PROJECTED
0 I:::t I I__ I__ I I~J [3 S I~ I:~ ~.t I r' I~ S
May 8, 1996
AOGCC
Larry Grant
3001 Porcupine Dr
Anchorage, AK 99501
Re: Distribution of Survey Data 15-45
Dear Mr. Grant,
Enclosed are two hard copies of the above mentioned file(s).
Well 15-45PB1 MWD survey, surface to 10,702'
Well 15-45 MWD survey, tied in at 9507.38', kickoff point 9531 ', interpolated depth
q'~'~; ~'c~ at 10774'
· J
lease' 1 me at 563-3256 if you have any questions or concerns.
Regards, /
/
Sandra Lufldn
Dept. Specialist
Attachments.
RECEIVED
0 8 199
Alaska 0il & Ga~ Con~. commission
Anchor~8
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date:
RE:
3 May 1996
Transmittal of Data
ECC #: 6666.00
Sent by: HAND CARRY
Data: OH-LDWG
Dear Sir/Madam,
Reference:
ARCO
15-45
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Prints/Films:
1 DLL FINAL BL+RF J Run # 1
1 CN FINAL BL+RFf Run # 1
1 DAC FINAL BL+RF - Run # 1
1 CN/ZDL FINAL BL+RF Run # 1
1 SSVD FINAL BL+RF Run # 1
1 BH-PRO FINAL BL+RF Run # 1
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
Received by: L~W~,A Date:
~ v ~ V ~? -- _/ \
]996
MEMORANDUM
TO:
THRU:
State of Alaska
David Johr~
Chairman
Blair Wondzeii~D,~
P. I. Supervisor
FROM: Bobby Foster~-~--' SUBJECT:
Petroleum Inspector
Alaska Oil and Gas Conservation Commission
DATE: May 4 & 5, 1996
FILE NO: CC91EDDD.doc
Casing Shoe Plug
ARCO - PBU - DS15-45
PTD # 96-0069
Prudhoe Bay Field
Saturday, May 4, 1996: I traveled this date to ARCO's PBU DS 15 well 45 after
being contacted by Vance Hazzard, ARCO drilling rep., informing me that they were
going to cement the 9.625" X 7" casing annulus. This annulus had been used to
inject rig water waste while the well was being drilled after the 7"casing had been
set and after injecting approximately 1800 bbls. returns to surface appeared in the
cellar. The well had been completed and the dg was move off.
! arrived at the location and met with Vance and he gave me the details of the
cement job. B & J Cementing Services moved in and rigged up. They pumped 110
bbls. of fresh water down the well at a rate of 4.5 bbls/min. @ 800 psig. Then 51
bbls. (300 sks.) of 14.9 lb/gal. Cold Set 2 was pumped at a rate of 4.5 bbl/min. @
900 psig which dropped to 300 psig at the end of the cementing. Then 21 bbis. of
fresh water was pumped followed by 57 bbls of diesel to freeze protect with a final
pressure of 1500 psig at 4.5 bbls/min, with the amount of cement pumped plus the
21bb/s. of fresh water and 57 bbls. of diesel the CTOC should be 1000' above and
below the 9.625" casing shoe. Cement was in place at 00:30 AM and 750 psig left
on the casing. ! monitored the cellars on 15-45 and the adjacent well and observed
no influx in done of the cellers.
Sunday, May 5, 1996: i returned to the location at 8:00 PM this date and a pressure
test was performed. The casing was 0 psig at the start of the test and was
pressured to 1500 psig and held for 20 minutes with no pressure loss. I told Vance
that everything looked OK to me and the well was turned over to production.
Summary: I witnessed the placement and testing of the cement set in the 9.625" X
7" andnuaus on ARCO PBU well DS 15-45.
Attachment: ARCo welibore Schematic
X Unclassified
Confidential (Unclassified if doc. removed
Classified
'~-~ STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMrv~,SSION
APPLICATION FOR SUNDRY APPROVAL
[] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
1. Type of Request: [] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
2. Name of Operator 15. Type of well: 6. Datum Elevation (DF or KB)
ARCO Alaska Inc. I [] Development RTE = 66.5'
[] Exploratory 7. Unit or Properly Name
3. Address Prudhoe Bay Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
4749' NSL, 5180' WEL, SEC. 22, T11N, R14E
At top of productive interval
2984' NSL, 1177' WEL, SEC. 16, T11N, R14E
At effective depth
At total depth
3740' NSL, 2099' WEL, SEC. 16, T11 N, R14E
R NAL
(Estimate - Not Final)
[] Stratigraphic
[] Service
8.
9.
10.
11.
Well Number
15-45
Permit Number
96-69
APl Number
50-029-22671
Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
11060 feet
8784 feet
feet
feet
Length
80'
3799'
9228'
Size
20"
9-5/8"
7"
Plugs (measured)
Junk (measured)
Cemented
260 sx Arctic Set (Approx.)
1085 sx CS III, 305 sx 'G', 200 sx CS II
212 sx Class 'G'
MD TVD
110' 110'
3829' 3570'
9258' 8287'
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
4. Estimated date for commencing operation
May 5, 1996
16. If proposal was verbally approved ~
Jack Hartz ~ 04/26/96
Name of approver Date approved
15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Contact Engineer Name/Number: Jim Smith, 564-5026 Prepared By Name/Number Terrie Hubble, 564-4628
17. I hereby certify that t~regoing~rrect to the best of my knowledge
Signed Dan Stoltz ~(.~'~ ~C.._~_/~/_.~ ..,.' Title Senior Drilling Engineer
_ ~
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness I Approval NO.
Plug integrity ,,~_ BOP Test__ Location clearance __
Mechanical Integrity Test__ Subsequent form r.~c~r,~(~8-Cop??
Original Signed By Returned
Approved by order of the Commission DaVid W. Jdhnst0n ___S-/~,,//¢i-[/Co~_m_rn_issioner Date ~/-~/('
Form 10-403 Rev. 06/15/88
Submit In Triplicate ~,
[ Well Name: I 15-45
Present Well Status
Casing and Cementing Details
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg MD/TVD MD/TVD
O.D.
30" 20" 91.5# H40 WELD 80' 30'/30' 110'/110'
12-1/4" 9-5/8" 40# L-80 BTC 3799' 30'/30' 3829'/3570'
8-1/2" 7" 26# L-80 BTCM 9228' 30'/30' 9258'/8287'
Casing Lead: Sxs/Wt/Yield Tail: Sxs/Wt/Yield
9-5/8" 1085/12.2/1.92 305/15.8/1.15
Top Out Job 200/14.95/0.96
7" none 212/15.8/1.14
Comments
Cold Set 1Ii & Class G
Top Out--CSII
Calc. TOC-7860' +/-
(950' above Put R.)
Ran and cemented the 9-5/8" with full returns, circulated and cemented at 9
BPM. Bumped plug. Tested casing to 3000 psi for 30 min.- good test
Ran and cemented the 7" casing while experiencing partial and then total
loss of returns. Top of cement is calculated based upon pressure increase
during last 40 bbl of displacement. Did not bump plug. (3 bbl short )
9-5/8" X 7" annulus presently contains mud and water, estimated weight is
between 8.9 ppg and 8.6 ppg. Calculations for annular cementing pressure
assume a 9.0 ppg fluid in the annulus.
8-1/2" open hole by 7" casing .0226 bbl/ft (.1268 ft3/ft)
9-5/8" 40# casing by 7" casing .0282 bbl/ft (.1585 ft3/ft)
Calculations as described in the original injection permit application:
(80% of collapse for 7" is 4325psi)
Injection Pressure
4325psi -(9.0-1.9)(.052)(3570')=3007psi; this is max injection pressure
with 9.0 ppg fluid in the annulus
Contacts
Name Office Home Pager
James E. Smith
David Nims
Drilling Eng.
Drilling Supt.
564-5026 345-8660 275-4015
564-5219 346-2026 275-4539
15-45
9-5/8" X 7" Annulus Cementing Program
Note'.
,
.
.
.
!
,
.
AOGCC requests a field inspector to
witness this work, contact 24hrs prior to
the job.
OBJECTIVE: Establish pressure integrity and seal in the 9-5/8" X 7"
annulus and isolate the 9-5/8" casing from the Cretaceous formations. This
objective will be achieved by down squeezing COLD SET II cement below
the 9-5/8" casing shoe and leaving 500' of cement in the 9-5/8" X 7"
annulus just above the 9-5/8" shoe.
Rig up BJ lines to the 9-5/8" X 7" casing annulus. Pressure test lines to 3000 psi.
Open the annulus valve on the wellhead and establish injection rate with water.
Build up rate in steps to achieve 5 BPM but do not exceed 3000 psi injection
pressure. Injection pressure is expected to be near 1300 psi at 5 bpm with water
based upon prior injection of mud. Pump a total of 110 bbl of water ahead
(annulus capacity is 108bbl)
Mix and pump 37 bbl (220 sx) of Cold Set II cement at 14.95ppg, 0.961 ft3/sx, to
provide 1000' of cement in the open hole X 7" casing and 500' of cement in the
9-5/8" X 7" annulus above the 9-5/8" casing shoe.
Displace the cement slurry with 25 bbl of water followed by 69 bbl of diesel to
place the TOC at 3329'MD (500' above the 9-5/8" casing shoe) and to freeze
protect the upper annulus. Maintain injection rate and monitor squeeze
pressure, especially when cement reaches the 9-5/8" casing shoe at about 71
barrels into displacement.
Stop pumping, close annulus valve and rig down BJ.
Monitor annulus pressure.
24 hours after cement is in place, pressure test the 9-5/8" X 7" annulus to 1000
psi or final squeeze pressure which ever is greater.
Jim Smith
SSD Engineer
TREE: 4" CIW
WELLHEAD: FMC 15-45 PROPOSED ,~. ,,,v-xx'
, BF. ELEV =xx'
ACTUATOR:
I
I ... Arctic freeze
protection
-- .......... ~ ~. TOC at 3329'MD
9 5/8", 40#/ft, L-
80, BTC
:
Base
Cement
;
7", 26¢/ft, L-80,i 9257'
BTC-Mod
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
4m6/96 J.E. Smith PROPOSED ANNULUS CEMENTING WELL: DS 15-45
APl NO'
SEC 22; TN 11; RGE 14
ARCO ALASKA
-r,,~.. 4. ~,w 15-45 (Actual)
WELLHEAD: FMC;
ACTUATOR:
'
95/8", 40#/ft, 13829r
L80, BTC i ,
4-1/2", 12.6#/ft, L-80, ,
IBT MOD TUBING
! 7" 4.5"
~;~ ~,-~-- x PACKER I 9056' ]
4-1/2 .... X" NIPPLE
j (OTIS) (3.813" ID) 9079'
TOP OF ~ .
LINER
B-I'G-Mod
:
~B'I-D
,,,.' % .,,' % ..' % ,,,-' % ..' ,,.,, ,,.' ,,.,, ..
,.,o, ,SOT l oeo'l
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
5/5/96 Hazzard ORIGINAL COMPLETION WELL: DS 15-45
APl NO: 50-029-22671
SEC 22; TN 11; RGE 14
ARCO ALASKA
)
)
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
David Johnston,
Chairman
DATE: April 25, 1996
THRU:
Blair Wondzell, ~
P. I. Supervisor
Doug Amos, ~~
Petroleum Ins~~r
FILE NO: ggghdydd.doc
FROM:
SUBJECT: Fluid Flow To Sur.
Arco PBU OS 1 5-45
Prudhoe Oil Pool
PTD # 96-0069
Thursday, April 25, 1996: I traveled to Arco's PBU 0515-45 well to
investigate the flow of fluid to surface from around the 9 5/8" casing into the
cellar. I inspected Doyon 14 cellar area I did not see any visible fluid flow,
however the 48" cellar was full of fluid. The adjacent cellars show no signs of
fluid flow in or around them.
I met with Shared Services rep. Gene Cooper and discussed the situation with
him. Gene had only been on location for 1 day and was totally in the dark
about the history of the well. Gene assured me that warning signs, prohibiting
annular injection, would be made up and place on the well head after
completion.
Gene copied the morning drilling report covering days April 18 thru April 20,
1996, the time span in which the 7" production casing was run and cemented.
The copies were of poor quality therefore I transcribed the important facts
pertaining to the 7" casing job, this copy is attached for reference.
From the information I gathered I do not understand why annular injection was
permitted in this well in the first place.
SUMMARY: I inspected Arco's PBU 0515-45 well for fluid flow to surface
from the 9 5/8" casing and collected information on the 7" production casing
cement job. ~ -. - -.--- -.----.
~tANNED NO\I 1 7 2005
.'
)
)
Attachment: Transcript from morning drilling report
)
)
Areo PBU Well 15-45 Doyon Rig 14 Morning Report Hiah Liahts
4/18/96:
Run 7" 00 Casing
Ran csg to 3820'
Hole started taking fluid @ 1600'
Circulated @ 3820'
Circ. casing volume (csg vol. ?)
Lost 50 bbl's @ 4 bpm
Hole displaced with water based mud 100.00% displaced
Ran casing to 9257'
Circulated 1 00 bbl's @ 6000' lost 90 bbl's
Landed casing but could not move same
Circulated at 9257'
Build volume and attempt to circulate
Circulated @ 1 & 2 bpm, no returns. Tried higher rate
No returns. Lost total of 354 bbl's.
Cement casing
Mix and pump slurry - 46.00 bbl's. Displace wI 351 bbl's did not bump plug.
Lost 331 bbl's fluid while cementing & displacing.
wac
4/19/96 :
wac
While waiting on cement annulus increased to 175 psi. Bled to 0 psi. 23 bbl's returns
Monitored well, well remained static
RI H to 9094'
Tag cement @ 9094. Displacement 3.03 bbl's short
Drill cement form 9094' to 9171'
Tagged float collar @ 9171'
Tested casing - via annulus and string to 3500 psi
Pressure test successful.
4/20/96 :
Drilled installed equipment - drilled float collar @ 9176', shoe @ 9261', 6' new hole
to 9271'
Circulated at 9271' circulated hole clean, monitor well Fluid static, 10.2 ppg EMW
Circulate @ 9271, Displace hole WI 9.0 ppg Flo-Pro
Monitor Well
Obtained required fluid properties - 100.00 % hole volume
Drilled to 9535.0'
Circulated @ 9535.0' circulate hole clean monitor well.
Obtained clean returns - 125% of hole volume
MEMOP. ANDU.M State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
David John.~
Chairman
DATE: April 25, 1996
THRU: Blair Wondzell, .~1~~ ~ NO:
P. I. Supervisor
FROM: Doug Amos, 4. ,~i /¢-,44 ;4... SUB,I-ECT:
Petroleum Inspector
ggghdydd.doc
Fluid Flow To Sur.
Arco PBU DS 15-45
Prudhoe Oil Pool
PTD # 96-O069
Thursday, April 25, ,1996: i traveled to Arco's PBU DS15-45 well to investigate
the flow of fluid to surface from around the 9 5/8" casing into the cellar. I
inspected Doyon 14 cellar area~did not see any visible fluid flow, however the 48"
cellar was full of fluid. The adjacent cellars show no signs of fluid flow in or
around them.
! met with Shared Services rep. Gene Cooper and discussed the situation with
him. Gene had only been on location for 1 day and was totally in the dark about ·
the history of the well. Gene assured me that warning signs, prohibiting annular
injection, would be made up and placec~on the well head after completion.
Gene copied the morning drilling report covering days April 18 thru April 20, 1996,
the time span in which the 7" production casing was run and cemented. The
copies were of poor quality therefore I transcribed the important facts pertaining to
the 7" casing job, this copy is attached for reference.
I had conversation with a Shared Services representative concerning the lack of
cement returns to surface on the 9 5/8" casing. After reviewing the data he
indicated, that in his opinion, annular injection into this well should not have
been initiated, i concur with this observation.
SUMMARY: i inspected Arco's PBU DS15-45 well for fluid flow to surface from
the 9 5/8" casing and collected information on the 7" production casing cement
job.
Attachment: Transcript from morning drilling report
Arco PBU Well 15-45 Doyon Ri.q 14 Mornin`o Report Hi_oh Lites
4118196:
Run 7" O.D. Casing
Ran csg to 3820'
Hole started taking fluid @ 1600'
Circulated @ 3820'
Circ. casing volume (csg vol ?)
Lost 50 bbl's @ 4 bpm
Hole displaced with water based mud 100.00% displaced
Ran casing to 9257'
Circulated 100 bbl's @ 6000' lost 90 bbl's
Landed casing but could not move same
Circulated at 9257'
Build volume and attempt to circulate
Circulated @ 1 & 2 bpm, no returns. Tried higher rate
No returns. Lost total of 354 bbl's.
Cement casing
Mix and pump slurry- 46.00 bbl's. Displace w/351 bbl's did not bump plug.
Lost 331 bbl's fluid while cementing & displacing.
WOC
4/19/96: WOC
While waiting on cement annulus increased to 175 psi. Bled to 0 psi. 23 bbl's returns
Monitored well, well remained static
RIH to 9094'
Tag cement @ 9094. Displacement 3.03 bbl's short
Drill cement form 9094' to 9171'
Tagged float collar @ 9171'
Tested casing - via annulus and string to 3500 psi
Pressure test successful.
4/20/96:
Drilled installed equipment - drilled float collar @ 9176', shoe @ 9261', 6' new hole
to 9271'
Circulated at 9271', circulated hole clean, monitoir well Fluid static, 10.2 ppg EMW
Circulate @ 9271, Displace hole W/9.0 ppg FIo-Pro
Monitor Well
Obtained required fluid properties - 100.00 % hole volume
Drilled to 9535.0'
Circulated @ 9535.0', circulate hole clean monitor well.
Obtained clean returns- 125% of hole volume
Operator ARCO Report 13, page 2
Field Prudhoe Bay Date 06:00, 20 Apr 96
~:~'~:-~.~ ~. ~ _
Depth i Instrument Type
fit) ~
9255.31 MWD - Standard {:declination corrected)
9285.61 MWD - Standard (declination corrected)
9381.1 i MWD'- Standard (decliflation corrected)
9475.81 MWD - Standard (declination corrected)
9507.41 MWD - Standard (declination corrected)
Head From
No. 0
06:00-
06:00-08:30
08:30
08:30-09:30
09:30
09:30-11:30
11:30
11:30-22:00
22:00
22:00-23:00
23:00
23:00-03:00
03:00
03:00-04:00
To Diam
0 0
Time
0
1~ Doyon 14 ............................ ;~'"
Inception -~-'~:::~mu~
-::':'~?: 19.~']~?'T~-''-~ ~7.14 Sin~ Shot
::~9.72~~~.70 Single Shof
~ - -..'~:~?~?.8~ ~~.30 Single Shot
BHA run no. 4
04:00
04:00-
i Rec
0
::
(%)
Survey Type
?' ' Comments ~'
Forrnati'6ntops: S~ Ri~er 9197 MD. '
.- ~aUil (20') 9223-27 MD.
" ......::'~' Shublik 9227 MD.
~p ~ne 4, 93~ MD.
: .~ -.~. ~ne 3, 9459
MD.
::C~ L~%~:~~:~ 9533 MD. .
Hi-Line ~w~ ~4 hr.
690 bbl mud inj into DS IS-45,
D- ] ~!1 w/~n~ AH~S 70 ~cc.
Rcvicwcd ~! ~nls on ~yon-]4.
Had P~r Review ~ ~uipmcnt ~udiL b~ Do~un- 16.
Drilled installed equipment - Float. collar
Drill float collar ~ 9176, shoe ~ 9261. 6' new
hole ~o ~271 : ,?:~:,~:~:;~.::~.: .:
Completed operations
Circulated at 9271.0 ft :':~'~:!:::i:.:~
Circulate hole clean. , ::' ~::~ ...... >: ...... '~- ;':'.-~-:,
Stopped : To circulate
Change fluid system ~o Flo-P~o..~ _
Circulated at 9271.0 fC :' ::: .....
Displace well w/ 9.0 Flo-Pro.
MoniCor well,
Obtained req. fluid properties - 100.00 %, hole vol.
Drilled to 9535.0 ft
Reached planed depth. ART-9.0 hr.
Reached planned end of run - Directional objective met
Circulated at 9535.0 ft :. --~,~:":~?:-_.
'Circulate hole clean. Monitor 'well.
Obtained clean returns - I25.00. % hole volume
Pulled BHA
BHA Stood back
Made up BHA no. 5
Orient MWD w/ Motor. -:--:.--: :--~_- -
BHA no. 5 made up -
R.I.H. to 5000.0 ft .:':? ......
Shallow test MWD ~
I
:
. . -~- ~- ~ - ~ .' 7 ~ - ' · ..... ' '~E .~ ~" ....... ~ "~" ' '",'..,.' '.. - ...'~(..,,'.~< :,~ ~ ~-~v~-~-
Morning -- .. ....
i ' II ' - ' II I ~ I I I '
- :' Ope~tor ARCO '- ~;;' <'~ :~
Field Pmdho~ Bay ~g ~yon.~14~_ '- .... ::~ _...~:.:~.. . -:'-~.:~,. --Date 06:~, 18 Apr ~
.........
- ~,.~_~.y/~5~...~../:..~:~/~~.~. .}~ ..... .~ . ~-~: z . · - '.'. '~ ~ '
: 06: 00-09: 30 R~ Casing, ~n O.D. :,': ' ~ ~. ~(5~'3:- _. ;-:2~.,-, '~.
06:00-09 30 Ran Casing =o 3820.0 f= (Tin OD) j~~ - -<--~%? -=~: ;~..~.a .....:,~}-~'
09:30 AC 9-5/8in casing shoe - -~,-'~<~-= ..... '~:~>-&'.-~ · '' ' '
.-.-'~:~.T-~ ;% V . ~.~....: ~ ' ..
. .. NO ACCIDE~S. NO SPILLS..~~_-~.` U_~-:::': ~-:: ~ _ ':" '
. 48 Days since las~ LTA.-'-~~:~-t.,-~ ....... %.- ..~:
4~ ~ays since last ~11. ._~.~..
Well i~ under budget ............. :2'=--'
09:30-10:30 Circulated at 3820.0 ft - ~ '~-'" ~'"
Circulated csg vol~e =" =-<:' ....
Lost 50 bbl ~ 4bpm. .:-?:~-~ ~. -'=~-,..:: ~ ~- I
10:30 Hole displaced wi~h Wa~er based mud - 100 50 % displaced
--~_
10:30-17:00 Run Casing, 7in O.D. .:~.'.-,_._,,_.~..~ '~.~
10: 30-17: 00 Ran Casing ~o 9257.0 ft (7in OD):-:~: J~"E'<":-' -' '
· Circulated 100 bbl ~ 6000', lost 90 bbl.
l~ded csg ~ 1700~ Could not~ve ~~.~= .... -..<__~.;:,.:~. . .. .. .
17: 00 Hanger landed '~' --~ .... : ...... ~'-~'~: ' '
17:00-21:30 Fluid system - -
17:00-21:30 Circulated at 9257,0 ft
Build vol~e and attempt to Circulate
while waiting on water truck. Circula%'~d
$ i & 2 bpm, no returns. Tried higher rate,
no returns. Los~ total of 354 bbl.
21:30 Stopped : To hold safety meeting ~ ~':'~ .... /~"~.'~
21:30- Cement = Casing cement
21:30-23:30 Mixed and u~ped slurry - 46.000 bbl ~':~' ""'.
Mixed & pumped cmt. Displaced w/ 351 bb]
did no~ b~p ~lug. ~ ~'~-'< ..... "'=~:"'~" ...... ' ~
Lost 331 bb! fluid whi~e ceme~ing & displacing. _
23: 30 Cemen~ pumped : ( '~.':::3-?"~'-
23: 30- Wai~ on cement ~, . -, :.--. ':.: ~ .-
Load pipe shed w/ 3 1'2" dp & bha ...... ._Strapped B~
while WOC. ' ' ~"->;" '~ "'
[ I [[] iii H I -~ " ' -- ~'~-'-' [ [ , .... , '" :
~iald P~dhoc Bay Ri= Doyon 14 :'~:::~?~:~-:~-~?~'/~.~: '- --' Date ~:~, 19 Apr 9~
~ i . '
0~: 00-0~: 30 C~=N:O Casing c~en= ~ '-:~ ~ :~:~?:~..~C~-%-~<~<:-:::; :' ~:':'-; '~ ' '
0~:00-08:30
08:30
08:30-16:30
08:30-09:30
09:30
09:30-11:30
11:30
11:30-15:00
'15:00
15:00-16~30
16:30
16:30-
16:30-18:00
18:00
18:00-21:00
21:00
21:00-22:00
22:00
22:00-00:00
00:00
00:00-03:00
03:00
03:00-05:30
05:30
05:30-06:00
06:00
Wait on cement
175 psi on annulus, bled to 0_ pSi:~:~:23 bbl returns.
· Monitor well. Well static on annUlus.
PJSM. Ref: ~nstall packo~.:~:'!~&~."ge rams, :'~':: ~"
Res~ed opera~ions ~' :':: ~:.~ ~
Test well con=rol e~ipment
Ins~alled Seal ass~ly ,_~._ _~:~:..~ ~ _~?~: ::-::~ '~'~:.: ~-'-:
E~ipmen= work comple=ed
Rigged up Ail r~ :~-':: :
Ch~ged ~op r~ ~o 3 1/2" x 6" ~R. Botom to 3
1/2' positive. :~
E~ipment work completed
Tested Ail r~ ~',::~,~.~ :~ --~':': ........ ~:~:- .... ~.
Tested BOPE, M~ifold & Safe~y valves w/ 500 & 5000
psi. : ;
Tested ~nular w/ 500 & 3000 psi. TeSted
Acc~ula~or.
Test waived by ~C Inspector.
Pressure ~est~completed successfully - 5000.0 psi
Installed Wear bushing
Changed out kellys.
Equipment w~rk completed :~ ' : '
BHA run no. 4
Made up BHA no. 4 ~:~
PJSM. Handling BHA.
Change blades on stabilizers.:~:~:~::~%
Install MWD / DWG probe.
BHA no. 4 made up
R.I.H. to 4182.0 ft
.
Shallow ~es~ MWD ~ 1200.
Stopped : To service drilling equipmen~
Serviced ~lock line
Line slipped and cut
Held drill (Stripping)
Discussed Killin9 well at end of s~ripp~ng drill.
Completed operations
R.I.H. to 9094.0 ft
Tag cement ~ 9094. Displacement 3.03 bbl short.
Stopped : To test equipment
Drilled cemen~ to 9094.0 ft
Torque and test kelly w/ 250/5000 psi.
Drill cement f/9094 co 9171. ' -
Ta~ed fioa~ ccilar ~ 7171
S~opped to ~es~ casing
Tested Casin9 - Via annulus and string
Tested 7" csg w/ 3500 psi
.Pressure test completed successfully - 3500.0 psi
ALASKA OIL AND GAS
CONSERVATION COMMISSION
TO/C[ KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
April 4, 1996
Terrry Jordan, Senior Drlg Engineer
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Prudhoe Bay Unit 15-45
ARCO Alaska, Inc.
Permit No: 96-69
Sur. Loc. 4749'NSL, 5180'WEL, Sec. 22, TllN, R14E, UM
Btmhole Loc. 1564'SNL, 2147'WEL, Sec. 16, TllN, R14E, UM
Dear Mr. Jordan:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations
until all other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed
before drilling below the surface casing shoe must be given so that a representative of the
Commission may witness the test. Notice may be given by contacting the Commission
petroleum field inspector on the North Slope pager at 659-3607.
DavidChairmanW. John~,~
BY ORDER OF THE COMMISSION
dlffEnclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrill[] lb. Type of well. Exploratoryl-1 Stratigraphic Test [] Development Oil []
Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. Plan RTE= 66.5 feet Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028306
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
4749' NSL, 5180' WEL, SEC. 22, T11N, R14E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
1806' SNL, 1148' WEL, SEC. 16, T11N, R14E 15-45 U-630610
At total depth 9. Approximate spud date Amount
1564' SNL, 2147' WEL, SEC. 16, T11N, R14E 04/05/96 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD andTVD)
property line
ADL 028303 1564 feet 15-19& 15-33, atsurface3o feet 2560 11405'MD/8787'TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 200 feet Maximum hole angle 9~ o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig
18. Casing program Specifications Setting Depth
s~ze Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data)
30" 20" 91.5# H40 Weld 80' 30' 30' 110' 110' 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 47# N-80 BTC 3790' 30' 30' 3820' 3569' 1246 sx CS III, 301 sx 'G', 250 sx CS II
8-1/2" 7" 26# L-80 BTCM 9205' 30' 30' 9235' 8267' 212 sx Class 'G'
6" 4-1/2" 12.6# L-80 IBT Mod 2320' 9085' 8125' 11405' 8787' 259 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor ~ F ~''
Surface ~-_~,~ ~ ~ ~
Intermediate
Production !,., o,q 0 ?
Liner
Perforation depth' measured ~,.,,~,', 0il & ¢-~.s r,~.,:,
· ,.,, ~;
true vertical ~"*~"'¢
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program [] Time vs depth plot [] Refraction analysis• Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby certify that th.e, foregoing is true and correct to the best of my knowledge
Signed-- '" ' ¢¢,~ ¢ _~ TitleSeniorDrillin~lEn~lineer Date
Commission Use Only
Permit Number APl number Approv. al date.~ See cover letter
~(,o-- (¢ c( 50- (Dca, ~ - ~2, (0 '~l ,.,,~---,'/--¢*'~'~¢--~ for other requirements
Conditions of approval Samples required [] Yes J~'No Mud Icg required []Yes ~No
Hydrogen sulfide measures ~Yes [] No Directional survey required I~ Yes [] No
Required working pressure for BOPE [] 2M; 1-13M; i~5M; I--I10M; i--115M;
Other: Original Signed By by order of ,,//_
Approved by David W. Johnston Commissioner ~ne commission Date
Form 10-401 Rev. 12-1-85 Submit in 'iplicate
I Well Name: 115-45
Well Plan Summary Revisions
]Type of Well (producer or injector): [Producer I
Surface Location: 4749' FSL, 5180' FEL, sec 22, T11N, R14E
X=676014.44 Y=5960952.49
Target Location: 1806' FNL, 1148'FEL, sec 16, T11N, R14E
X=674664.63 Y=5964925.57
Bottom Hole Location: 1564' FNL, 2147 'FEL, sec 16, T11N, R14E
X=673660.00 Y=5965145.00
I AFE Number: 14J0309.0
I
Estimated Start Date:
I^Pr. 0S, 1996 I
MD: ]11405'I ITVD:
I Rig: I DOYON 14
Operating days to 124
complete:
I
8787'I GR RKBE: I 66'5' 32.7'
I Well Design (conventional, slimhole, etc.):I Ultra-Slimhole Horizontal
Formation Markers:
Formation Tops MD TVD Based on BW/ADJUSTED TOPS for
(BKB) WP10
Base of Permafrost 1997 1900
9-5/8" Casing 3820 3569 Set above the T5
TT4/T5/SV3 3832 3579
UGNU Sands 5971 5413 Ugnu S marker
WEST SAK 6798 6122
SEABEE (K-12) 7061 6347
K-5 8245 7362
PUT RIVER 8874 7927 BHRZ is 8863'MD, 7917'TVD
LCU (KINGAK) 8921 7972
SAG RIVER 9174 8209
SHUBLIK 9225 8257 ? F W ~'! \/.: ~'~
7" Casing 9235 8267
Sadlerochit (Z4B) 9289 8317
Zone 3 9441 8460 '"'~
Zone 2 9530 8543
GOC 9715 8697
Zone 1 9789 8742
Kavik 9965 8799 Begin Lateral @ 10019'MD,8801'TVD
End of Lateral 11405 8787 Lateral is 1386'MD in length
Casing/Tubing Program:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg MD/TVD MD/TVD
O.D.
30" 20" 91.5# H40 WELD 80' 30'/30' 110'/110'
12-1/4" 9-5/8" 47# N-80 BTC 3790' 30'/30' 3820'/3569'
8-1/2" 7" 26# L-80 BTCM 9205' 30'/30' 9235'/8267'
6" 4 1/2" 12.6# L80 IBTMod 2320' 9085'/8125' 11405'/8787'
NA 4 1/2" 12.6# L80 IBTMod 9055' surface 9085'
Logging Program:
]Open Hole Logs:
I Cased Hole Logs:
12-1/4" MWD Dir
8-1/2" MWD Dir from surface shoe to intermediate casing point. MWD
Dir/GR from 100' MD above the BHRZ.(Pick up with PDC bit).
Sample catcher from Zone 2 to TD.
6" MWD Dir/GR to TD
GR-DEN-NPHI-RES-SONIC from TD' to Casing shoe
GR w/PRIMARY DEPTH CONTROL-PDC (post rig work)
Mud Program:
Special design MI Flow Pro ® Polymer system in 6" horizontal hole section.
considerations Higher mud weight in the surface hole possibly needed due to
Cretaceous interval injection.
Surface Mud Properties: ] 12-1/4" hole section
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.0 300 60 60 80 8.5 25
to to to to to to to
9.8 100 20 15 20 10 20
Intermediate Mud Properties: 18-1/2" hole section
Density Plastic Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.4 8 10 5 30 8.5 15
to to to to to to to
10.5 15 25 15 50 10.5 5
Production Mud Properties: 16" hole section
Density LSRV Yield 10 sec 10 min pH Fluid
(PPG) (cps) Point gel gel Loss
8.5 50,000 40 18 24 8 <6
to to to to to to to
9.0 75,000 45 23 29 9 <6
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
I KOP: 1 200' MD
Maximum Hole Angle:
Close Approach Well:
91 degrees, start @ 10119'MD
nearest wells 15-19 & 15-33 both 30' away at
surface, both will be shut-in during rig up and
rig down of the drilling operation.No downhole
close approach.
Cement Data:
Casing/Liner Lead:
Sxs/Wt/Yield
9-5/8" 1246/12.2/1.92
Top Out Job 250/14.95/0.96
7" none
4-1/2" none
Tail: Sxs/Wt/Yield
301/15.8/1.15
212/15.8/1.14
259/15.7/1.19
Comments
Cold Set IH & Class
"G"
Top Out--CSII
TOC-7874' +/-
(1000' above Put R.)
Class "G"Acid resist.
Name
Contacts
Office
Home
Pager
James E. Smith
David Nims
Drilling Eng.
Drilling Supt.
564-5026
564-5219
345-8660
346-2026
275-4015
275-4539
Drilling Hazards
Surface Hole
Possible tight hole in both the permafrost and lower zone, hole enlargement
and casing drag. Hole cleaning is critical, design flowrates high enough to clean
the expected washed out hole, not gauge hole. It is recommended that all drills,
except for a diverter drill, be scheduled for either casing point or lower section of
hole. Drill, case and cement the surface hole as fast as possible.
Faulting
In many wells on Drill Site 15, drilling through faults has resulted in catastrophic
lost returns. Be aware that faults are present on Drill Site 15 and are known to
be conductive. The asset have listed as a major uncertainty the presence and
location of smaller conductive faults. A fault with up to 50' of throw is possible
just above the Sag River (Sag top at 9174'MD, 8209'TVD). No other faults have
been prognosed within the target polygon.
Close Approaches
The nearest surface well, 15-33 is 30ft south from the 15-45 wellhead.
The 15-19 well is located 30ft north of the 15-45. Both wells will be shut-
in and secured during the move in and rigup/rig down. The wells can be
returned to service after rig up and until just before rig release. There are
no deep close approaches.
Pore Pressure Expectations
CRETACEOUS (3832'-7061'MD): The Cretaceous interval on Drill Site 15
has possible overpressured sands in the T-5 to K12 intervals. The degree of
overpressuring will depend at any given time on the daily injection volume at
GC3-D. The 15-48, drilling on Jan 23, 1996, had flow between 4000-5675 MD,
(4000-5630 TVD). Mud weight had to be raised from 9.3 ppg to 9.8 ppg. Close
contact with the onsite pad supervisor on the injection status at GC3-D is
necessary. It is recommended that a 9.8 ppg mud is in the hole prior to 4500
TVD.
K-5 to BASE HRZ (8245'-8863'MD): Pore pressures should be in the
normal range considering shales (9.2-9.5 ppg) but 9.8 ppg should be maintained
due to Cretaceous overpressure.
PUT RIVER (8874'-8921'MD):(45'TVD thick) Some gas cut mud problems
have been observed. It is recommended that mud weight be 10.4 ppg at the
Put River. 15-48 drilled into the Put River with 10.0 ppg mud, the mud was gas
cut and the weight was raised in steps to 10.4 ppg before drilling ahead while
prior wells this year and late last year on DS 15 drilled the Put River with 10.0-10.1
ppg. The 10.4 ppg weight should produce sufficient overbalance for the Put River.
High levels of cuttings gas should be expected from this interval. If gas-cut mud
becomes a problem, pick up off bottom and circulate the gas cut mud out of the
system. If after circulating bottoms up the gas still appears in the mud, raise the
mud weight by 0.1-0.2 ppg and circulate the gas out. Continue drilling if the well
appears stable.
SAG RIVER (9174'-9225'MD): No DS 15 well drilled during the 1995-96
season has seen problems with the Sag while drilling with 9.0-10.4 ppg fluid.
SADLEROCHIT (9289'-TD): Current pore pressure in the Sadelrochit is
3550 psi @ 8800' TVDss (7.7 ppg EMW). Mud weights used on DS 15
previously were 8.8 - 9.3 ppg.
Lost Circulation
Lost circulation has been a serious problem on Drill Site 15, but catastrophic
losses have been primarily associated with crossing faults. Be prepared to
handle massive lost circulation associated with faults following
M-I's recommendations, a prototype (Damaging) massive loss
circulation prevention fluid has been developed but not tested, use
is decided on a case by case condition. Check with D. Nims before
use.
Lost circulation from seepage has been most common at mud weights greater
than 10.2 ppg, with loss rates of 20 - 50 bph. Be prepared to handle lost
circulation as we drill below the Put River. If lost circulation due to
seepage occurs and is at a Iow rate, OM Seal and Liquid Casing have shown to
be effective. In cases of catastrophic losses, pre-treatment with calcium
carbonate followed by Maraseal has been effective in controlling losses.
· Stuck Pipe
There has been several cases of stuck pipe, 15-6 Cretaceous, 15-24 Ivishak
and 15-4 Ivishak zone 2. There were also some cases of tite hole. Stuck pipe
potential for this well is highest in the Sag River and Shublik due to the
decrease in pore pressure, and in the Kingak due to mud weights too Iow for the
stabilization of the shales
· Surface Casing Shoe Kick Tolerance
The smallest kick tolerance for the casing shoes is calculated as 29.3 bbls of
influx assuming a swabbed gas influx at the top of the Put River along the
planned directional path. Based on 10.2 ppg MW (8874'MD & 7927"TVD, 10.2
ppg reservoir pore pressure, and a 12.5 ppg shoe test.
15-45 DRILLING AND COMPLETION PROGRAM
,
MIRU drilling rig. N/U diverter and function test same. Ensure diverter setup
conforms to diagram posted with AOGCC, and that the flowlines to the
production skid are protected.
.
Drill 121/4" hole to surface casing point (10' TVD above the T5) as per
Recommended Practices for Surface Hole, VI.0. Hole cleaning is critical,
design for flowrates on washed out hole, not gauge. Drill, case and cement the
surface hole as fast as possible.
Run and cement 9-5/8'' surface casing. NU BOPE, function test and pressure
test to 5000 psi.
.
PU 8-1/2" BHA and RIH. Test casing to 3000 psi for 30 minutes. Drill 10' of new
hole and perform leak off test. Expected LOT is 13.1ppg EMW based on the
15-49 (March '96).
,
RIH and drill 81/2" hole as per directional program to 11'MD(10'TVD) into the
Shublik formation, ensure rat hole to provide casing shoe into the Shublik.
Follow the Recommended Practices for Intermediate Hole V1. O.
,
MU and RIH with 7" casing string with RA tag (from Atlas) 5 joints above the
shoe and cement as per well plan to put cement 1000' above the Put River.
.
MU 6" MWD BHA and PU 3-1/2" DP. Clean out to 7" float collar and test
casing to 3500 psi for 30 min. Drill 10' of new hole and run a formation
integrity test at 0.5 ppg or more than the expected mud weight to be used
to drill the section. Displace to 9.0 ppg used FIo Pro mud system. Drill
ahead following the directional plan, picking up the build BHA and
completing that section to horiz. Follow the Recommended Practices for
Production Hole, VI.0.
,
Drill the horizontal section, limit tricone bit runs on the medium speed motor to
about 20 hr. The 6 inch BHA will have a downhole recorded
MWD/G R/Resistivity
,
Full suite open hole logging is requested for this section from TD to 7 inch
shoe.
9. If required, run solid (Baker) hole opener to TD of 6" hole. Circulate hole clean.
10.
Run 41/2", L-80 solid liner assembly to bottom. Space the liner hanger and
packer 150' above the 7" casing shoe.
11.
12.
13.
14.
15.
16.
17.
18.
Cement the liner in place with the total cement volume based on 30% excess in
the openhole, 150' liner lap, top of cement 200' above the liner with drillpipe in
the hole, and 80' shoe volume.
Set liner hanger and packer. Unsting running tool and reverse circulate excess
cement from the wellbore. POOH.
RIH with clean-out mill. Clean out to landing collar. Test liner and liner lap to
3500 psi for 10 minutes.
Displace well to clean, filtered, seawater. Test liner and liner lap to 3500 psi for
30 minutes.
RIH with 2 3/4" drillpipe conveyed perforating guns and perforate the 41/2" liner.
POOH and lay down guns.
RIH with 41/2'' L-80 completion with SSSV, 3-GLMs (4-1/2" KBG-2-LS(mod)),
and 7"x 41/2" packer. Packer should be set with the wireline reentry guide
spaced out to set in the liner tieback stem. Circulate filtered treated seawater.
Set packer and test tubing to 4000 psi. Refer to the Recommended Practices for
Running Tubing, V3.2.
Set 2-way check valve. Test to 1000 psi. ND BOPs. NU tubing head adapter
and tree. Test same to 5000 psi. Pull 2-way check valve. Test 41/2" x 7"
annulus to 3500 psi with 2000 psi on tubing. Shear RP valve.
Freeze protect well through shear valve in top GLM station. Set BPV, Release
rig.
Disposal
Cuttings Handling:
Fluid Handling:
Cuttings should be hauled to the ball mill at CC-2A.
All drilling and completion fluids can be annular injected.
Well DS 15-45 is being permitted for annular injection.
Request to AOGCC for Annular Pumping Approval For DS 15-45
1. Approval is requested for Annular Pumping for well DS 15-45 and any well on the
pad/drillsite previously permitted for disposal activities by AGOCC.
2. The Base of the Permafrost for all wells located in the PBU Unit is 1900 feet. Aquifers
in the PBU Unit have been exempted from Class II injection activities by the AOGCC by Aquifer
Exemption Order #1 as referenced in Area Injection Order #4 (PBU-EOA).
3. The receiving zone to which the fluids will migrate is identified as the Sagavanirtok
(Tertiary/Cretaceous Sands) geological formation at 3579 'TVD. The confining layer is the
overlying shales above the SV3, defined by the base of the permafrost and 3574 'TVD. Additional
data which demonstrates the confining layers, porosity, and permeability of the injection zone
was submitted to the AOGCC on 7/25/95.
4. There are 54 wells on Pad/Drillsite 15. There may be additional unidentified wells
within a quarter mile distance from the subject well. There are no domestic or industrial water
use wells located within one mile of the project area.
5-6. The drilling wastes to be disposed of during this operations can be defined as drilling
muds and cuttings, rig wash up and waste water, cement wash up water, brine, and formation
fluids. The maximum volume to be disposed of in the annulus is 35,000 bbls. The maximum
density is 17 ppg.
7. The Maximum Allowable Surface Pressure while annular pumping is calculated
according to the following equation and is 1523 psi for a 17 ppg fluid in this well.
MASP = 4325 psig - ((fluid density ppg - 1.9) X 0.052 X 9-5/8" Casing Shoe TVD
8. The 9-5/8" casing shoe will be set at 3820'md (3569' tvd) and cemented with 1547
sacks of cement. This depth is below the base of the permafrost (1900'TVD) and into the SV3
formation which has a long established history of annular pumping at PBU.
9. The burst rating (80%) for the 9-5/8" casing is 5496 psig while the collapse rating
(80%) of the 7" 26# L80 casing is 4325 psig. The break down pressure of the Ugnu formation
is 13.5 ppg equivalent mud weight.
1 0. Pumping into the hydrocarbon reservior will not occur.
DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS.
AREA WELL PREV VOL PERMITTED PERMITTED DATES
INJECTED (BBL) VOL (BBL)
PBU DS 15-45 0 '35000 submitted
95/8" Surface Casing-Cementing Program
Casing Size: 95/8'', 47#, N-80, BTC
Circ. Temperature: 40°F
Spacer: 75 bbls fresh water ahead of lead slurry.
Lead Cement Type: BJ Coldset III + 1 ghs FP-6L
12.2 ppg 1.92 ft3/sx 10.53 gps 1247
Barrels
426
Thickening Time I
4.00 hrs +
Tail Cement Type: Class G + 2% A-7 CaC1 + 1 ghs FP-6L
(all volumes to be recalculated at location prior to job.)
Weight Yield IMix Water Sacks
15.8 ppg 1.15 ft3/sx 4.95 gps 301
Barrels Thickening Time
62 3.5 hrs +/-
Top Job Cement Type: Cold Set II, with Sodium Citrate retarder
14.95 ppg 0.96 ft3/sx 4.95 gps 250 43
Thickening Time
NA
Centralizer Placement:
1. Run one(l) bow type centralizer per joint for the first 15 joints.
2. Place the centralizers in the middle of each joint with a stop collar.
3. Do not run cement baskets.
Other Cement Considerations:
1. Mix all slurries "on the fly."
Cement Volume Basis
1. Lead slurry to surface w/100% excess.
2. Tail slurry volume 500' fill w/100% excess
3. Top job volume 250 sx.
Other Information
See Recommended Practices for Surface Hole, Version 0.0 for more details
7" Intermediate Casing-Cementing Program
Casing Type: 7", 26#, L-80, Mod gTC
Circ Temperature: 130° F
Preflush/Spacer: 20 bbls of H20,50 bbls BJ MCA-4 spacer at 1.0 ppg over mud
weight.
Tail Cement Type: Class G + 0.35% FL-33 + 0.3% CD-32+ 0.1%R-1 + 1 ghs FP-6L
as required (all volumes to be recalculated at location prior to job.) Calculated fill is to
the 1000' above the top of the Put River sands
tWeight [Yield tMix water
~i~ ~-~ 1.14 ft3/sx 4.95 gps
[Sacks tBarrels [Thickening Time
212 43 3.5- 4.5 hfs
Centralizer Placement:
1. 1 turbulator centralizer (1/4" under hole size) per joint, in the middle of the joint for the
first 10 joints.
Other Cement Considerations:
1. Perform lab tests on mixed cement/spacer/mud program and ensure compatibility
prior to pumping job.
2. Ensure thickening times are adequate relative to pumping job requirement.
3. Displace at as per Recommended Practices for given hole section.
Cement Volume Basis
1. fill with 30% excess (on 8 1/2" hole) designing for 1000 ft above the PUT.
41/2" Liner-Cementing Program
Job Type: 6" hole and 4-1/2", 12.6#, L-80, IBT-Mod production liner
Circ. Temperature: 140° F. Bottom Hole Static Temp = 220° F at 8800' SS.
Preflush/Spacer: 20 bbls of H20 (with 2%KC1), 50 bbls MCS-4 w/2% KCL at
1.0 ppg over mud weight.
Cement Type: Class G + 175 ghs BA-86L + 2% A-9 + 0.3% FL-33 + 0.6% CD-32 +
0.2% A-2 + 0.5% gel + 1 ghs FP-6L (all volumes to be recalculated at location prior to
job.)
Weight Yield Mix Water Sacks Barrels Thickening Time
15.7 ppg 1.19 ft3/sx 3.43 gps 259 55 3-4 hr @ 140° includes .75hr
@sfc
Centralizer Placement:
1. Run 2 turbolators per joint over the entire length of the liner except for the joint that
will be reciprocating in and out of the 7" intermediate shoe. (1/8" under hole size)
2. Turbulator placement may be revised based on hole condition after the hole
opener run is completed. It is very important that a good cement job is achieved.
Note: well designed for 15 deg/100 ft build.
Other Cement Considerations:
1. Ensure that a thickening time test is performed that simulates the shut down
time incurred while rotating off the liner. Note gellation tendencies of slurry
when consistometer is re-started after shutdown period. If additional retarder is
required, consult with cementer.
2 Batch mix the cement slurry.
3. Fluid loss should be 50cc or less.
4. Displace @ 5-7 bpm.
Cement Volume Basis
1. Open hole + 30% excess
2. 41/2" casing capacity below landing collar
3. 150' of liner lap
4. 200' of cement above the liner top.
TREE: 4" CIW ,
WELLHEAD: FMC 1 5-45 PROPOSED KB. ELEV =xx
BF. ELEV =xx'
ACTUATOR:
O ~----SSSV LANDING NIPPLE [ 2200'
I
95/8",47#/,,,N-1382or--
80, BTC
i
GAS LIFT MANDRELS
N° MD(BKB) TVDss
'~' ~ 3 XXX XXX
4-1/2", 12.6#/ft, L-80, 2 XXX XXX
IBT MOD TUBING
1 XXX XXX
GASLIFT
~1 i~~ 7"x4.5" PACKER 19015' I
4-1/2 .... X" NIPPLE
L, I I ~~ (OTIS) (3.813" ID) 19055' I
TOP OF
4.5" 19o85't
LINER
7", 26#/ft, L-80, 19235' I
BTC-Mod
I
,:,,,T,:, I11325'1 ~- :,-:,,:,,:,-:,-:,-'
m...._ ,.'%/% / % .z %,~%,,,'%'.
IBTMod 11 405'
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
03/31/96 J.E. Smith PROPOSED ORIGINAL COMPLETION WELL: DS 15-45
APl NO:
SEC 22; TN 11; RGE 14
ARCO ALASKA
NOTES
.
16 ·
6 · DRILL SITE 15 ~...
26 ·
,5 · ,
"
23 ·
1 ·
24 ~ 47
32 ·
41 .39 J~ .36.34
·BBBBBIIII
· 20
i7
· 8
· 30
· g
· 25
· 10
· 11
· 12
· 1,.3
· 14
· 15
· 42
1. Dote of Survey:. November 22-2.3, 1995.
2. Reference Field Book: PB95-12(pgs. 06-09).
5. Horizontol ond verticol control is bosed on
monuments Mon-15C ond Mon-15D.
4. Alosko store Plone Coordinotes ore Zone 4,
Alosko, NAD 27.
5. Drill site 15 overoge scole foctor is 0.999.355.
SURVEYOR'S CgRTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF NOVEMBER 23, 1995.
&- AS-BUILT WELL
·
- .
· EXISTiN.S WELL
LOCATED WITHIN PROTRACTED SECTION 22 T. 11 N. R. 14 E. UMIAT MERIDIAN ALASKA
WELL A,S.P. P N~T- D TI I CELLER SECTION
NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV, OFFSETS
45 Y=5,960,952.49 N. 2,124.61 70'17'56.099" 70.2989165' 4,749' FSL
X= 676,014.44 E. 200.48 148'34'28.002" 148.5744450' 32.7' 5,180' FEL
Y=5,960,967.37 N. 2,159.96 70'17'56.247" 70.2989574' ~.,764' FSL
46 iX= 676,010.66 E. 200.15 148'54'28,102" 148.5744728' 32.6' 5,183' FEL
Y'--5,960,879.49 N. 2,049.70 70'17'55.378" 70.2987160' 4,676' FS-~'
49 X= 676,031.26 E. 200.45 148'.34'27.562" 148.5743227' 52.7' 5,162' FEL
A CO Al sk , 'Inc..
DRILL SITE 15
CONDUCTOR AS-BUILT
WELLS 45, 46 &: 49
C(3PY - C~AHGF.,D vd~ N0.43 TO 49
11/'24/95
DSISAB
DOYON 14 Prepared by JAMES E. SMITH 3/31/96 Page 1
DOYON 14
engine
exhaust
engine
exhaust
70 ft
61 ft
V'
air
exhaust
over 100'
radius
0
boiler exhaust
engine
exhaust
I
ij
68 ft
Page 1
rI
16"
diverter
line
I41 ft
34 ft
/ Itargeted ''T''
J Iwith 1'' wall
~3 __ IfOr4' behind
II I
II · ~,~
II
II
I!
II
II
II
TI
II
II
II
II
II
II
II
I!
II
II
II
II
II
II
II
II
II
II
Il
I!
II
II
II
REFERENCE OW~NO/$HT NO:.
'I'-PROD'FNC7 ~0 4951
:7 WELL #15-21
120'-0"
Il ·
II
II
II
II
II
II
II
II
II
II
II
II TOP) g~
I!
ii Bo'FrOM) z ~
,,
:, 8'-PROD-FNC7 TO 4951
II
II
MODULE DS15-2801
~DD-3751-007~
E 2+65'-0'
T.O.S. EL ~
E 2+49'
.#19l
EXIST. A.L.
o
SEE DETAIL #2
#49 #18
3o'-o- 5'-oL
z
¢' .FLEXPIPE (BY O.THE
(TYP. 8 PLACES)
SEE DETAIL #1
WELLS E 2+00'-0'
I
RE¥1SIONS
BPX - Shared Serv[ Drilling
Alaska State Plane:
PBU' EOA: DS15
15-45 As-Built
15-45 Wp10 AWD
HALLIBURTON
8c.~,l 40o It. in.
WELL DESIGN
m
~(~1' t 9174 KD ~p
3~
CRITICAL PDINT ~ATA
Tlr' I}4 0 0,00' e60, O0*
KDP / START~000,00' 260,~* ~00 0 N
1.00'/100 ft
ST~T DF 700 5.00' E60.~' ~99 4 s ~1
C~YE 8
· T~T 0F 1410 14,00' 300,00'1400 34 N IR7
~00'/L00 F~
~ ~ ~RVE 1941 17.00' 339.~' t913 139 ~ ~LO
B~e 1997 17,00' 33%~' lO~Z 154N
~VE 9
~5~'/lOO F~
383~ 3L.G0' 343.~' 3579970 470
T-3 449~ 31.00' 343.~' 4147[30~ N
K-15 ~087 31,00' 343.~' 46551594N 665
U~J · ~971 3t.00' 343.~' 54[3~030 N 799
Ves¢ S~N 6798 31.00' 343.~* 61~ 2437N 9~
K-i~ 7061 3L.00' 343.~' 6347~557 ~
K-~O 7~8 31~0~ 343~ ~'~747~7~
K-5 6~45 3t. O0' 343.~' 73613150 ~ 1[40
C~VE
10.00'/100 ~t
E~ ~ CURVE86[~ EO. O0* 346,00'7~3 3aea N tto~
K-2 B63& ao.oo' 346.~' 770t3330N 1194
K-I 8848 eo.eo' 3~6.~' 7~0~3401 N
~z 88~3 eo.e0' 3~6.~' 7~173406N L~3
~ 8974 ~0,C0' 346.~' 79e7340~ N l~14
B~ Pu~ / 89Zl ~D,C0* 346.00'797134~N IZLB
L~ / T~
~D~k 8gB~ ~O.O0' 346.~' B0~B3445 ~
~ A 9078 20.00' 346,~' 81193477 1230
S~ ~74 e0,00' 346,~' BEOB3509 N
$hubtlk - A 9~03 Z0.00' 346,~' BZSG35E6 N L~43
Sh~tlk - B9~49 ~0. OO' 346.~' 8~793534 N t~45
~tlk C 9~64 ~0,00' 346,~' 8Z933539 N
Zone 4 9289 ZO,O0' 346.~' B3tG3547 N t~4B
Zone3 9441 ~0.00' 346.~' 84593597 N t~G0
Zone Z 9530 ZO.O0' 3~.~' 654330Z7 N T2GB
ST~T DF 9531 ~0.00' 346,~' 854436~7 N L~68
T~go 9549 2~65' 349.75'95613634 ~ L~69
Ro~ 97~ 45.78' 35%53' 0~9~37~ L~76
Zone I 9709 57.8~' ~.OB* 0741a7BSN L075
~ S~d / K~vlk9965 94,~0' 5.98' 87983950 N L~63
~ ~ CURVE 9906 84.3~' 5.99' 879939~ N LE63
ST~T DF 9977 84,3~' 5.99' 8800396~ N
~VE 9
e~ ~ ~rv[ tOOtS ~0.30' 7.00' eB,~4~3 ~
~l 10019 90.50' 7.00' Beet4004
ST~T DF 10099 90,50' 7.00' B90t4093 N LZ47
~ ~ CURVE 10844 90.44' ~47.7~'679144~ N 1738
~T~T OF IL404 90,44' ~47.78'67674~46N ~56
C~YE
15. Ye'/tOO F~
;15-Y Pq~yl IL405 90.40' ~47,7B'87864Z46 N
T~,-g¢~ N~-~e TVD NS EW G~ld XG~id Y
tS-T polyoo~ 87874946 N E~56 V 673650 5965145
15-Y Potyt 07874e46 N~ZSG V 673660 5965145
L5-Y Poty~ 8787456t N1579 Y 674330 5065475
IS-Y Puly3 87874553 N[~9 Y 674680 5965475
IS-Y Po[y4 87873468 NL~54 v 674600 5964390
15-Y ?oty5 87873473 N1474 V 674460 5964390
lS-Y Poty6 87874093 N1461V 674460 5954940
BPI BSOZ4004 NleS7 V 674665 59649~6
Top Hold 773~3354 N1~0~ V 674735 5964~77
DD MD I,-~: AzlTV8 N/S E/V
5/8 ~ 3BP0 31.00' 343, C~* 3569970 N 474 V
9235 20.00' 346,00'8;=67 35;~9 N 1243 V
4 I/E ll40D 90.45' ~47.78'87864246 N ~2~6 i
PLOT INFORMATION
DRAWING NAME/FILE NAME
16-~ WplO ~CWT~J:~I / 164~'*'hl
SURFACE L~ATION P~P03~ B~
No~ 5,~0.~2 ~ ] ~ A~ed ~ ~08.70
t996
V~iiN ~ :
WELL PLAN PROFILE SUMMARY
STACITMD F-J~D MD F~d',I~EOAC*I~ITY
o ~o ~ ~tl tz I/4' v~ ~t ~ ~.
8its ~s~td ~nt ~UL ~ 7' ~q ~ln~ I 9U~ ~
WELL PERMIT CHECKLIST
COMPANY
GEOL AREA
PROGRAM~ exp [] dev~ redrll [] serv [] wellbore seg []
ADMINISTRATION
1. Permit fee attached .................. ~N
2. Lease number appropriate ................ ~ N
3. Unique well name and number ............... ~ N
4. Well located in a defined pool ............. ~..N
5. Well located proper distance from drlg unit boundary.. ~ N
6. Well located proper distance from other wells ...... ~ N
7. Sufficient acreage available in drilling unit ...... ~ N
8. If deviated, is wellbore plat included ......... l~ N
9. Operator only affected party .............. ~ N
10. Operator has appropriate bond in force ......... ~ N
11. Permit can be issued without conservation order ..... ~ N
12. Permit can be issued without administrative approval. . ~ N
13. Can permit be approved before 15-day wait ........ ~ N
REMARKS
ENGINEERING
14. Conductor string provided ............... ~N
15. Surface casing protects all known USDWs ........
16. CMT vol adequate to circulate on conductor & surf sag..~
17. CMT vol adequate to tie-in long string to surf csg . . . Y N~ ~__.~-~-~
18. CMT will cover all known productive horizons ......
19. Casing designs adequate for C, T, B & permafrost .... ~~N~ N ~_
20. Adequate tankage or reserve pit ............
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed .........
23. If diverter required, is it adequate ..........
24. Drilling fluid program schematic & equip list adequate .~ N
25. BOPEs adequate ................ .~. .... ~ N
26. BOPE press rating adequate; test to ~'~'~ psig.~ N --
27. Choke manifold complies w/API RP-53 (May~4~ .....
28. Work will occur without operation shutdown ....... ~ N
29. Is presence of H2S gas probable ............ -~V N
GEOLOGY
/'
30. Permit can be issued w/o hydrogen sulfide meas~
31. Data presented on potential overp~ .... Y ~
32. Seismic analysis of shallo?~~nes. ......... Y N
33. Seabed con~ (if off-shore) ........ Y N
~D~TE.~,q /34' Cont me/phone for weeklY[exploratoryprogreSSonly]reports ..... Y N
GEOLOGY:
ENGINEERING: COMMISSION:
Comments/Instructions:
O
Z
O
HOW/ljb - A:\FORMS~,cheklist rev 11195
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~,ARCO ALASKA INC
~ p.S. 15-45
~ ~~~~~UDHOE BAY
I
SEP 10 ""--
8650'
Run 1'
22 - April - 1996
I
DLUDAC/ZDL/CN/GR
10179'
WESTERN
ATLAS
Logging Services
Tape Subfile 2 is type: ~S
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
RUN 1
6666.00
R. ECK
H. HAYWOOD
D.S. 15-45
500292267100
ARCO ALASKA, INC.
WESTERN ATLAS LOGGING SERVICES
04-SEP-96
RUN 2 RUN 3
22
liN
14E
4749
5180
67.06
66.56
32.70
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING 6.000
REMARKS: DLL/GR/ZDL/CN/DAC.
7.000 9258.0
10191.0
CIRCULATION STOPPED AT 0030 22-APR-96
NEUTRON LOG PARAMETERS:
OPEN HOLE SECTION
SANDSTONE MATRIX,
BOREHOLE CORRECTION = CALIPER,
CASING CORRECTIONS OFF,
SALINITY = 0.00 PPM.
NEUTRON LOG PARAMETERS:
CASED HOLE SECTION
SANDSTONE MATRIX,
CASING CORRECTIONS ON,
SALINITY = 0.00 PPM.
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings;
hole data.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
DLL
BCS
SDN
2446
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA
depth shifted and clipped curves;
.5000
START DEPTH STOP DEPTH
9250.0 10089.0
9250.0 10164.0
9250.0 10089.0
9250.0 10120.0
9250.0 10095.0
GRCH,
(MEASURED DEPTH)
BASELINE DEPTH GR
9256.5 9245.5
9258.0
9261.5
9269.5 9258.5
9270.5 9259.0
9271.5 9260.0
9272.0 9261.0
9278.0
9293.5
9294.0
9317.0
9318.0
9332.0
9332.5
9286.0
9287.0
9288.0
9290.5
9293.5
9295.5
9296.0
9301.0
9304.5
9305.5
9307.0
9313.0
9314.5
9320.0
9328.5
9329.0
9334.5
9337.5
9339.0
9343.0
9344.0
9344.5
9348.5
9349.5
9351.0
9358.5
9359.0
9368.5
9374.0
9374.5
9385.5
SWS; 18-AUG-96
EQUIVALENT UNSHIFTED DEPTH
LL3 RHOB DT
9251.0
9285.0
9271.5
9277.5
9278.5
9279.0
9281.5
9282.0
9290.5
9308.5
9315.0
9295.0
9302.5
9323.0
9326.0
9333.0
9338.5
9363.5
9347.5
9374.5
9337.0
9339.5
9348.5
9358.0
9374.5
all runs merged;
NPHI
9251.0
9284.0
9326.0
9327.5
9363.0
no case
9386.
9387.
9389.
9390.
9396.
9398.
9398.
9401.
9405.
9406.
9412.
9412.
9417.
9417.
9418.
9418.
9419.
9419.
9421.
9422.
9425.
9429.
9430.
9430.
9431.
9437.
9440.
9442.
9445.
9451.
9453.
9467.
9468.
9514.
9519.
9547.
9548.
9548.
9549.
9550.
9551.
9552.
9553.
9554.
9555.
9555.
9558.
9558.
9559.
9559.
9560.
9561.
9562.
9562.
9563.
9563.
9564.
9564.
9565.
9565.
9378.5
9379.5
9385.0
9413.5
9440.0
9536.0
9537.0
9548.5
9549.5
9551.0
9551.5
9553.5
9554.5
9555.0
9390.0
9401.0
9409.5
9417.5
9418.5
9419.0
9426.0
9429.0
9456.0
9552.0
9375.0
9377.5
9386.0
9387.0
9406.0
9406.5
9407.5
9419.5
9537.5
9538.5
9539.0
9542.5
9543.0
9544.0
9547.0
9548.0
9548.5
9549.5
9552.5
9553.0
9553.5
9554.0
375.5
9376.0
9393.5
9395.0
9406.0
9406.5
9408.0
9539.5
9540.5
9541.0
9544.0
9549.0
9553.0
9553.5
9554.5
9400.5
9411.5
9430.5
9433.5
9442.5
9456.5
9502.5
9508.0
9537.5
9544.0
9545.0
9552.5
9553.0
9566.5
9568.0.
9569.0
9573.0
9575.5
9576.0
9577.0
9578.0
9579.0
9581.5
9582.0
9583.0
9584.0
9584.5
9585.5
9586.0
9601.5
9665.5
9666.0
9666.5
9667.0
9668.5
9685.0
9685.5
9686.5
9687.0
9748.5
9749.0
9750.0
9778.5
9818.5
9829.0
9829.5
9846.0
9847.5
9860.5
9861.0
9882.5
9883.5
9885.0
9888.0
9889.5
9892.0
9898.5
9930.5
9938.0
9994.5
10004.0
10075.0
10075.5
10078.0
10084.5
$
MERGED DATA SOURCE
PBU TOOL CODE
GR
DLL
BCS
SDN
95,,.0
9558.5
9559.0
9574.5
9575.0
9665.5
9687.5
RUN NO.
1
1
1
1
9563.0
9576.5
9667.0
9690.0
9753.0
9849.0
9892.0
10087.5
PASS NO.
4
4
4
4
9564
9565
9566
9567
9568
9571
9573
9573
.5
.5
.5
.0
.0
.5
.0
.5
9572.5
9591.5
9666.5
9687.5
9751.0
9832.0
9670.0
9687.5
9751.0
9782.0
9820.0
9831.0
9862.5
9884.0
9889.0
9901.0
9933.5
9996.5
10077.5
9862.5
9885.5
9894.0
10004.0
10078.0
MERGE TOP
9250.0
9250.0
9250.0
9250.0
9557.0
9571.5
9666.0
9689.0
9753.5
9849.0
9887.0
9938.5
10005.0
10077.5
MERGE BASE
10089.0
10164.0
10089.0
10120.0
2446
$
REMARKS:
1 4
925t 3
OPEN HOLE PORTION OF THE MAIN PASS.
LLD, & MTEM WERE SHIFTED WITH LL3
DRHO, CALl & PEF WERE SHIFTED WITH RHOB
TEND & TENS WERE SHIFTED WITH DT
FUCT & NUCT WERE SHIFTED WITH NPHI
10095.0
CN
WN
FN
COUN
STAT
/??MATCH1.OUT
/??MATCH2.OUT
/??MATCH3.OUT
/??MATCH4.OUT
/??MATCH5.OUT
$
: ARCO ALASKA INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR BCS 68 1 GAPI
2 DT BCS 68 1 US/F
3 TEND BCS 68 1 LB
4 TENS BCS 68 1 LB
5 LL3 DLL 68 1 OHMM
6 LLD DLL 68 1 OHMM
7 MTEM DLL 68 1 DEGF
8 RHOB SDN 68 1 G/CC
9 DRHO SDN 68 1 G/CC
10 PEF SDN 68 1 BN/E
11 CALl SDN 68 1 IN
12 NPHI 2446 68 1 PU-S
13 NUCT 2446 68 1 CPS
14 FUCT 2446 68 1 CPS
4 4 57 995 99 1
4 4 57 530 16 1
4 4 57 995 99 1
4 4 57 995 99 1
4 4 17 995 99 1
4 4 17 995 99 1
4 4 17 995 99 1
4 4 49 995 99 1
4 4 49 995 99 1
4 4 49 995 99 1
4 4 49 995 99 1
4 4 47 995 99 1
4 4 47 995 99 1
4 4 47 995 99 1
56
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 116
Tape File Start Depth
Tape File End Depth
= 10165.000000
= 9245.000000
Tape File Level Spa=~ng =
Tape File-Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 27616 datums
Tape Subfile: 2 371 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
0.500000
Tape Subfite 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves
PASS NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GRCH 8572.0
2446 8660.0
$
BASELINE CURVE FOR SHIFTS: GRCH,
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH GRCH
8584.5 8574.5
8585.0 8575.0
8587.5 8578.0
8588.0 8578.5
8589.0 8579.0
8602.0 8592.0
8602.5 8593.0
8612.5 8602.5
8640.0 8630.0
8641.0 8630.5
8642.5 8632.0
8657.0 8647.0
8658.0
8659.0
8665.5 8655.5
8669.5 8660.0
8675.0 8665.5
8677.5 8667.5
8678.5 8668.5
8688.0 8678.5
8688.5 8679.0
8689.5 8679.5
8716.5 8706.5
8717.0 8707.5
8723.5 8714.0
8724.5 8714.5
8731.0 8721.0
8731.5 8722.0
8732.5 8723.0
8733.5 8723.5
8753.0
8753.5 8743.5
8754.5 8744.0
8765.0 8755.5
8770.0 8760.5
8771.0 8761.0
8807.0 8797.0
8807.5 8798.0
8808.0 8798.5
8809.0 8799.0
for open hole logs run into casing.
STOP DEPTH
9250.0
9250.0
SWS; 18-AUG-96
EQUIVALENT UNSHIFTED DEPTH
NPHI
8646.0
8647.0
8742.5
8743.0
8821.5
8822.5
8833.5
8838.5
8840.0
8849.0
8850.0
8852.5
8854.5
8855.5
8860.0
8861.0
8880.5
8890.0
8890.5
8891.5
8892.0
8892.5
8893.0
8893.5
8895.0
8976.5
8979.5
8981.5
8982.5
8985.0
8985.5
8986.0
8989.0
9039.5
9040.0
9040.5
9050.5
9051.0
9051.5
9182.0
9184.0
9184.5
9186.0
9186.5
9187.5
9195.5
9196.0
9197.5
9205.0
9205.5
9206.5
9208.5
9209.0
9218.0
9222.0
9222.5
REMARKS:
8830.0
8842.0
8844.0
8845.5
8850.0
8850.5
8870.0
8881.5
8882.0
8882.5
8884.5
8965.5
8968.5
8972.0
8975.0
8976.0
8979.0
9028.5
9029.0
9030.0
9040.0
9041.0
9041.5
9171.5
9173.5
9174.0
9175.5
9176.0
9176.5
9184.5
9185.5
9187.0
9194.0
9197.5
9198.5
9211.5
9212.0
8811.5
8812.5
8824.0
8829.0
8838.5
8839.5
8880.5
8881.0
8881.5
8882.5
8883.5
8884.0
8965.5
8968.5
8971.0
8975.5
9196.5
9197.5
9198.5
9210.0
CASED HOLE SECTION.
/ ? ?MATCH6. OUT
/ ? ?MATCH7. OUT
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GRCH 2446 68 1 GAPI
2 NPHI 2446 68 1 PU-S
3 FUCT 2446 68 1 CPS
4 NUCT 2446 68 1 CPS
5 TEND 2446 68 1 LB
6 TENS 2446 68 1 LB
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 47 995 99 1
4 47 995 99 1
4 47 995 99 1
4 47 995 99 1
4 47 995 99 1
4 47 995 99 1
24
* DATA RECORD (TYPE# 0)
Total Data Records: 38
1014 BYTES *
Tape File Start Depth = 9250.000000
Tape File End Depth = 8570.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9528 datums
Tape Subfile: 3 160 records...
MinimUm record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4-is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
1
1
4
0.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 8572.0 10090.0
DLL 9230.0 10165.0
DAC 8657.0 10990.0
ZDL 9240.0 10121.0
2446 8670.0 10096.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
MIS
KNJT
TTRM
COMR
KNJT
GR
CN
KNJT
ZDL
KNJT
ACOM
DAC
SLAM
KNJT
DLL
KNJT
TGRD
$
SWIVEL
MASS ISOLATION
KNUCKLE JOINT
TEMPERATURE
COMMON REMOTE
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
KNUCKLE JOINT
Z-DENSITY
KNUCKLE JOINT
ACOUSTIC COMMON
DIGITAL ACOUSTILOG
SLAM ADAPTER
KNUCKLE JOINT
DUAL LATEROLOG
KNUCKLE JOINT
TOOL GUARD
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
22-APR-96
ECLIPS 2.2
0030 22-APR-96
1230 22-APR-96
10191.0
10179.0
-8650.0
10179.0
900.0
TOOL NUMBER
3944XA
3997XA
3923XA
3981XA
3510XA
3923XA
1329XA
2446XA
3923XA
2228EA/2228MA
3923XA
1667EA
1680MA
3516XA
3923XA
1229EA/1229MA
3923XA
1313ZZ
6.000
9258.0
LOGGER'S CASING DE~'£H (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (MT)
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: MAIN PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
9, 3.0
FLO-PRO
10.59
71.0
8.6
4.4
175.0
0.085
0.034
0.077
0.000
0.093
0.000
THERMAL
SANDSTONE
2.65
0.000
0.0
71.0
175.0
71.0
0.0
71.0
0.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
16 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR DAC
2 DT DAC
3 CHT DAC
4 TTEN DAC
5 SPD DAC
6 RS DLL
7 RD DLL
8 WTBH DLL
9 ZDEN ZDL
10 ZCOR ZDL
11 PE ZDL
12 CAL ZDL
13 CNC 2446
14 CNCF 2446
68 1 GAPI
68 1 US/F
68 1 LB
68 1 LB
68 1 F/MN
68 1 OHMM
68 1 OHMM
68 1 DEGF
68 1 G/C3
68 1 G/C3
68 1 BN/E
68 1 IN
68 1 PU-S
68 1 PU-S
4 56 310 01 1
4 56 520 99 1
4 56 635 99 1
4 56 635 99 1
4 56 636 99 1
4 17 220 09 1
4 17 220 10 1
4 17 995 99 1
4 46 350 01 1
4 46 356 99 1
4 46 358 01 1
4 46 280 99 1
4 47 995 99 1
4 47 995 99 1
15 LSN 2446 68 1 CPS
16 SSN 2'446 68 1 CPS
* DATA RECORD (TYPE# 0)
Total Data Records: 456
958 BYTES *
47 334 31
4 47 334 30
64
Tape File Start Depth = 10165.000000
Tape File End Depth = 8570.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 136094 datums
Tape Subfile: 4 545 records...
Minimum record length: 62 bytes
Maximum record length: 958 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8572.0
DLL 9230.0
DAC
ZDL
2446
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
8657.0
9240.0
8670.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIVEL
MASS ISOLATION
KNUCKLE JOINT
TEMPERATURE
COMMON REMOTE
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
KNUCKLE JOINT
Z-DENSITY
KNUCKLE JOINT
ACOUSTIC COMMON
DIGITAL ACOUSTILOG
SLAM ADAPTER
KNUCKLE JOINT
DUAL LATEROLOG
KNUCKLE JOINT
TOOL GUARD
SWIV
MIS
KNJT
TTRM
COMR
KNJT
GR
CN
KNJT
ZDL
KNJT
ACOM
DAC
SLAM
KNJT
DLL
KNJT
TGRD
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
STOP DEPTH
10090.0
10165.0
10990.0
10121.0
10096.0
22-APR-96
ECLIPS 2.2
0030 22-APR-96
1230 22-APR-96
10191.0
10179.0
8650.0
10179.0
900.0
TOOL NUMBER
3944XA
3997XA
3923XA
3981XA
3510XA
3923XA
1329XA
2446XA
3923XA
2228EA/2228MA
3923XA
1667EA
1680MA
3516XA
3923XA
1229EA/1229MA
3923XA
1313ZZ
6.000
9258.0
9250.0
BOREHOLE CONDITIONS
MUD TYPE:-
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (MT)
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: REPEAT PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
FLO-PRO
10.59
71.0
8.6
4.4
175.0
0.085
0.034
0.077
0.000
0.093
0.000
THERMAL
SANDSTONE
2.65
0.000
0.0
71.0
175.0
71.0
0.0
71.0
0.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
16 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
GR DAC 68 1 GAPI
DT DAC 68 1 US/F
CHT DAC 68 1 LB
TTEN DAC 68 1 LB
SPD DAC 68 1 F/MN
RS DLL 68 1 OHMM
RD DLL 68 1 OHMM
WTBH DLL 68 1 DEGF
ZDEN ZDL 68 1 G/C3
ZCOR ZDL 68 1 G/C3
PE ZDL 68 1 BN/E
CAL ZDL 68 1 IN
CNC 2446 68 1 PU-S
CNCF 2446 68 1 PU-S
LSN 2446 68 1 CPS
SSN 2446 68 1 CPS
4 56 310 01 1
4 56 520 99 1
4 56 635 99 1
4 56 635 99 1
4 56 636 99 1
4 17 220 09 1
4 17 220 10 1
4 17 995 99 1
4 46 350 01 1
4 46 356 99 1
4 46 358 01 1
4 46 280 99 1
4 47 995 99 1
4 47 995 99 1
4 47 334 31 1
4 47 334 30 1
* DATA RECORD (TYPE# 0)
Total Data Records: 102
958 BYTES *
64
Tape File Start Depth = 10165.000000
Tape File End Depth = 9810.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 33686 datums
Tape Subfile: 5 189 records...
Minimum record length: 62 bytes
Maximum record length: 958 bytes
Tape Subfiie 6 is type: LIS
96/ 9/ 5
01
**** REEL TRAILER ****
96/ 9/ 6
01
Tape Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Fri 6 SEP 96 9:30a
Elapsed execution time = 3.02 seconds.
SYSTEM RETURN CODE = 0
,.
TapD Subfile 2 is type: _S
PRUDHOE BAY UNIT
MWD/MAD LOGS ....
WELL NAME: .... ~ ? ~/~' '~ ?'?~ i.~-m '~ ~'~, ' '. ~;" (~ ~ D S 15- 4 5
API NUMBER:' ~ ['i~ ???~ ~[~: .... ~ 560~92267100
OPERATOR: [~ ~> L. ~ '~ . ~CO ~S~, INC.
LO~ING COM~: f/~ SPERRY-S~ DRILLING SERVICES
TAPE CREATION DAT~B~~ 01-OCT-96
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
AK-MM- 960420
S. BURKHARDT
J. GAFFANEY
MWD RUN 5
S. BURKHARDT
J. GAFFANEY
MWD RUN 10
C. GRIFFIN
G. COOPER
MWD RUN 11
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
C. GRIFFIN
G. COOPER
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
MWD RUN 12
G. GRIFFIN
G. COOPER
22
liN
14E
4749
5180
66.56
32.70
MWD RUN 13
T. MCGUIRE
G. COOPER
RECEIVED
OCT 0 9 1996
Oil & Gas Cons. Commi~ior~
Anchorag~
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
30.000 20.000 110.0
12.250 9.625 3829.0
8.500 7.000 9256.0
6.000 11061.0
MWD - GR/EWR4.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WELL 15-45 IS REPRESENTED BY RUNS 1-5 AND 10-13.
RUNS 1-3 ARE DIRECTIONAL ONLY AND NO DATA IS PRESENTED.
RUNS 4-5 AND 10-12 ARE DIRECTIONAL WITH GAMMA RAY
(NGP/SGRD).
GAMMA RAY (NGP/SGRD) DATA IN INTERVAL 9500' TO 9531'
ACQUIRED DURING RUN 5. NOTE THAT NO RUN 5 SROP DATA
IS USED.
GAMMA RAY DATA TO 10670' WAS ACQUIRED WITH NATURAL GAMMA
PROBE, SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS
NGP/SGRD TYPE DATA.
RUN 13 IS DIRECTIONAL WITH GAMMA RAY (DGR/SGRC), AND
ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4).
GAMMA RAY DATA FROM 10670' TO 10951' WAS ACQUIRED WITH
DUAL GAMMA RAY, GEIGER MUELLER TYPE DETECTORS, AND IS
DENOTED DGR/SGRC TYPE DATA.
RESISTIVITY (EWR4) DATA FROM 9835' TO 10609' ACQUIRED
WHILE TRIPPING IN HOLE TO START RUN 13.
WELL 15-45 KICKED-OFF FROM WELL 15-45 PB1 AT 9531'.
WELL 15-45 IS DRILLED TO TD AT 11061'.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves;
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 9061.0
RP 9832.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
all bit runs merged.
BASELINE DEPTH GR
9060.5 9063.0
9063.0 9065.5
9077.5 9079.0
9084.0 9087.5
9132.0 9134.5
9135.5 9138.5
9190.0 9193.5
9194.0 9197.0
9200.5 9203.0
9202.0 9204.5
9220.5 9223.0
9224.0 9227.0
9250.5 9255.5
9254.5 9259.5
9263.0 9267.5
9270.5 9275.0
9273.5 9277.5
9290.0 9294.0
9295.5 9300.0
9305.0 9309.5
9313.0 9318.0
9320.0 9324.0
9333.0 9337.0
9343.5 9348.5
9349.0 9354.0
9400.5 9405.5
9412.5 9416.5
9418.0 9422.0
9422.5 9426.0
9436.0 9440.5
9445.5 9449.5
9451 . 0 9455 . 0
9572.5 9573.5
9580.0 9582.0
9662.5 9665.0
9669.0 9671.5
9686.0 9688.5
9692.0 9695.0
9743.5 9746.0
9762.0 9763.5
9772.5 9774.5
9803.5 9806.0
9820.5 9823.5
STOP DEPTH
10948.0
10955.0
(WALS, Open Hole, 22-APR-96.)
EQUIVALENT UNSHIFTED DEPTH
.9853~0 9&_ ~.5
9864.5 9868.0
9874.0 9876.5
9880.0 9883.0
11057.5 11060.5
$
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP
MWD 4 9265.0
MWD 10 9531.0
MWD 11 9817.0
MWD 12 9918.0
MWD 13 10732.0
$
REMARKS: MERGED MAIN PASS.
MERGE BASE
9531.0
9817.0
9918.0
10732.0
11060.0
CN
WN
FN
COUN
STAT
/? ?SHIFT. OUT
$
: ARCO ALASKA, INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68' 1 OHMM 4
6 FET MWD 68 1 HR 4
7 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 130
Tape File Start Depth - 11061.000000
Tape File End Depth = 9060.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
*~** ~ILE TRAILER ***~
LIS representation code decoding summary:
Rep Code: 68 32025 datums
Tape Subfile: 2 281 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tap'e subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9063.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIM UMANGLE:
STOP DEPTH
9500.0
20 -APR- 96
MSC 1.32
DEP 2.041
MEMORY
9535.0
9265.0
9535.0
0
17.8
19.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 188
BOREHOLE AIqD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPER3kTURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CA/CE AT MT:
LT DISP
10.00
50.O
10.3
1200
15.8
.000
.000
.000
.000
.0
112.1
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 4.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45
: PRIIDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 12
Tape File Start Depth = 9540.000000
Tape File End Depth = 9063.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
2866 datums
Tape Subfile: 3
75 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Su~file 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9452.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9531.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MIID AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS: MWD RUN 5.
21-APR-96
MSC 1.32
DEP 2.041
MEMORY
9935.0
9535.0
9935.0
0
17.9
69.8
TOOL NUMBER
NGP 38
6.000
9256.0
FLO-PRO
8.90
60.0
8.9
38500
5.2
.000
.000
.000
.000
.0
129.2
.0
.0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
ONLY GR DA . IS PRESENTED.
$
: ARCO ALASKA, INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: A3~kS KA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
1 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
4 90 310 01 1
* DATA RECORD (TYPE# 0) 1022 BYTES *
Total Data Records:
Tape File Start Depth = 9531.000000
Tape File End Depth = 9445.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
32372 datums
Tape Subfile: 4
66 records...
Minimum record length:
Maximum record length:
62 bytes
1022 bytes
Tape subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 10
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9388.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9748.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
27-APR-96
MSC 1.32
DEP 2.041
MEMORY
9817.0
9531.0
9817.0
0
17.9
50.6
TOOL NUMBER
NGP 188
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT):
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MI/D DENSITY (LB/G) :
MLED VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
8.90
63.0
8.5
41000
6.8
.000
.000
.000
.000
.0
116.4
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 10.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
t GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 9815.000000
Tape File End Depth = 9380.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS~ representation code decoding summary:
Rep Code: 68 5480 datums
Tape Subfile: 5 74 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape subfile 6 is type: LIS
FILE HEADER
FILE NLIMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9748.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIM UMANGLE:
STOP DEPTH
9856.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
27-APR-96
MSC 1.32
DEP 2.041
MEMORY
9918.0
9817.0
9918.0
0
56.2
71.8
TOOL NUMBER
NGP 38
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MI/D AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO- PRO
8.90
63.0
8.5
41000
6.8
.000
.000
.000
.000
.0
108.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 11.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 5
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
Tape File Start Depth = 9925.000000
Tape File End Depth = 9740.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 33486 datums
Tape Subfile: 6 68 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Su~file 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 12
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9843.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUMANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10670.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
28-APR-96
MSC 1.32
DEP 2.041
MEMORY
10732.0
9918.0
10732.0
0
80.4
92.4
TOOL NUMBER
NGP 188
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPER3ITURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
8.90
64.0
9.0
38000
12.0
.000
.000
.000
.000
.0
133.2
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 12.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD. 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 22
Tape File Start Depth = 10740.000000
Tape File End Depth = 9835.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 10914 datums
Tape Subfile: 7 85 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 13
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9829.0
EWR4 9835.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMIIMANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10951.0
10958.0
30-APR-96
MSC 1.32
DEP 2.041
MEMORY
11060.0
10732.0
11060.0
0
85.8
94.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
TOOL NUMBER
P0502SP4
P0502SP4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
9.10
66.0
8.4
38000
4.6
.000
.000
.000
.000
.0
172.4
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS:
CN
WN
FN
COUN
STAT
MWD RUN 13.
$
: ARCO ALASKA, INC.
: D.S. 15-45
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68 1 OHMM 4
6 FET MWD 68 1 HR 4
7 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 81
Tape File Start Depth = 11061.000000
Tape File End Depth = 9820.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 53351 datums
Tape Subfile: 8 146 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape subfile 9 is type: LIS
96/ 9/30
O1
**** REEL TRAILER ****
96/10/ 2
01
Tape Subfile: 9 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Wed 2 OCT 96 ll:41a
Elapsed execution time = 1.97 seconds.
SYSTEM RETURN CODE = 0
_ape Subfile 2 is type: iS
TAPE HEADER
PRUDHOE BAY UNIT
M /MAD mOSS
t '.,~ '.'i~ ..... %;¢k~ S 15-45 PB1
WELL NAME: .~-- ~ , ~ ,.~ :., ,,:~.~ ~.~. ~,~,.
_
OPERATOR: ': !'~'~"~
LOGGING
TAPE CREATION DATE:
JOB DATA
MWD RUN 4 MHD RUN 5
JOB NUMBER: AK-MM- 960420
LOGGING ENGINEER: S. BURKHARDT S. BURKHARDT
OPERATOR WITNESS: J. GAFFANEY J. GAFFANEY
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
01-OCT-96
MWD RUN 6
S. BURKHARDT
J. GAFFANEY
MWD RUN 7
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
S. BURKHARDT
J. GAFFANEY
MWD RUN 8
S. BURKHARDT
J. GAFFANEY
22
liN
14E
4749
5180
66.56
32.70
F ECEIVED
OCT 0 9 1996
Alask Oil & Gas CoDs. CommissioD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
!ST STRING 30.000 20.000 110.0
2ND STRING 12.250 9.625 3829.0
3RD STRING 8.500 7.000 9256.0
PRODUCTION STRING 6.000 10702.0
REMARKS:
MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WELL 15-45 PB1 IS REPRESENTED BY RUNS 1-8.
RUNS 1-3 ARE DIRECTIONAL ONLY AND NO DATA IS PRESENTED.
RUNS 4-8 ARE DIRECTIONAL WITH GAMMA RAY.
THE GAMMA RAY DATA WAS ACQUIRED WITH NATURAL GAMMA
PROBE, SCINTILLATION TYPE DETECTOR, AND IS DENOTED
AS NGP/SGRD.
WELL 15-45 PB1 WAS DRILLED TO TD AT 10702'.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves;
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 9061.0
$
BASELINE CURVE FOR SHIFTS: UNKNOWN
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
9060.5
9063.0
9077.5
9084.0
9132.0
9135.5
9190.0
9194.0
9200.5
9202.0
9220.5
9224.0
9250.5
9254.5
9263.0
9270.5
9273.5
9290.0
9295.5
9305.0
9310.0
9313.0
9320.0
9333.0
9343.5
9349.0
9400.5
9412.5
9418.0
9422.5
9436.0
9445.5
9451.0
9458.5
9471.5
9492.5
9530.0
10699.5
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
GR
9063.0
9065.5
9079.0
9087.5
9134.5
9138.5
9193.5
9197.0
9203.0
9204.5
9223.0
9227.0
9255.5
9259.5
9267.5
9275.0
9277.5
9294.0
9300.0
9309.5
9315.0
9318.0
9324.0
9337.0
9348.5
9354.0
9405.5
9416.5
9422.0
9426.0
9440.5
9449.5
9455.0
9459.0
9473.0
9495.5
9532.0
10701.5
BIT RUN NO
4
5
all bit runs merged.
STOP DEPTH
10638.0
EQUIVALENT UNSHIFTED DEPTH
MERGE TOP MERGE BASE
9265.0 9535.0
9535.0 9935.0
REMARKS:
9935.0 10191.0
10191.0 10366.0
10366.0 10702.0
MERGED MAIN PASS.
CN
~WN
FN
COUN
STAT
/? ?SHIFT. OUT
$
: ARCO ALASKA, INC.
: D.S. 15-45 PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1' AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 40
Tape File Start Depth = 10702.000000
Tape File End Depth = 9060.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9856 datums
Tape Subfile: 2 168 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9063.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMD74ANGLE:
STOP DEPTH
95O0.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
20-APR-96
MSC 1.32
DEP 2.041
MEMORY
9535.0
9265.0
9535.0
0
17.8
19.7
TOOL NUMBER
NGP 188
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LT DISP
10.00
50.0
10.3
1200
15.8
.000
.000
.000
.000
.0
112.1
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 4.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45 PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 12
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
Tape File Start Depth = 9540.000000
Tape File End Depth = 9063.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 2866 datums
Tape Subfile: 3 75 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9452.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIM UMANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9869.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
21 -APR- 96
MSC 1.32
DEP 2. 041
MEMORY
9935.0
9535.0
9935.0
0
17.9
69.8
TOOL NUMBER
NGP 38
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO- PRO
8.90
60.0
8.9
38500
5.2
.000
.000
.000
.000
.0
129.2
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 5.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45 PB1
: PRUDHOE BAY
: NORTH SLOPE
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 12
Tape File Start Depth = 9940.000000
Tape File End Depth = 9445.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
12830 datums
Tape Subfile: 4
75 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9832.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10131.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
22-APR-96
MSC 1.32
DEP 2.041
MEMORY
10191.0
9935.0
10191.0
0
72.0
90.0
TOOL NUMBER
NGP 188
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:.
MUD FILTR31TE AT MT:
MUD CAKE AT MT:
FLO-PRO
8.90
60.0
8.2
38100
14.8
.000
.000
.000
.000
.0
120.2
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 6.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45 PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
t GR MWD 68 1 AAPI 4
2 ROp MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 9
Tape File Start Depth = 10200.000000
Tape File End Depth = 9825.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 5120 datums
Tape Subfile: 5 72 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10105.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERS ION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAX IMUM ANGLE:
STOP DEPTH
10304.0
23-APR-96
MSC 1.32
DEP 2.041
MEMORY
10366.0
10191.0
10366.0
0
90.0
93.1
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 188
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO - PRO
9.00
61.0
8.0
36500
4.0
.000
.000
.000
.000
.0
124.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 7.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 15-45 PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68
2 ROP MWD 68
1 AAPI 4
1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10375.000000
Tape File End Depth = 10100.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
14484 datums
Tape Subfile: 6
70 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and lo9 header data for each bit run in separate files.
BIT RUN NO: 8
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10278.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10640.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
24-APR-96
MSC 1.32
DEP 2.041
MEMORY
10702.0
10366.0
10702.0
0
92.4
99.6
TOOL NUMBER
NGP 38
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9256.0
BOREHOLE CONDITIONS MUD TYPE:
MI/D DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MI/D AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO- PRO
8.90
71.0
8.5
38100
4.0
.000
.000
.000
.000
.0
125.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 8.
CN
WN
FN
COUN
STAT
ARCO ALASKA, INC.
D.S. 15-45 PB1
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 10702.000000
Tape File End Depth = 10270.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
7716 datums
Tape Subfile: 7
74 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 8 is type: LIS
96/ 9/30
O1
**** REEL TRAILER ****
96/10/ 2
01
Tape Subfile: 8 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Wed 2 OCT 96 11:43a
Elapsed execution time = 1.26 seconds.
SYSTEM RETURN CODE = 0