~C14= - () Lj 0 Well History File Identifier
Organizing (done)
o Two-sided 11111111I1111111111
R~CAN
\Ø Color Items:
o Greyscale Items:
DIGITAL DATA
~skettes, No. I
o Other, NolType:
o Poor Quality Originals:
o Other:
NOTES:
Date: b !a loft;
I
DateS I <3/a0
---L x 30 = :3 0
BY: ~
Project Proofing
BY: ~
/5/
Production Scanning
Stage 1 Page Count from Scanned File: ...,. Lf._ (Count does include cover sheet)
V YES
Scanning Preparation
BY:
Date:
Page Count Matches Number in scanï·ng P¡eparation:
BY: ~ . Date: "5 3/00
Stage 1 If NO in stage 1, page(s) discrepancies were found:
BY:
Maria
Date:
Scanning is complete at this point unless rescanning is required.
o Rescan Needed 1111111111111111 III
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
o Logs of various kinds:
o Other::
Y11P
/5/
III II 111111111 ,,11/
l11f
+ :;)...3 = TOTAL PAGES l;3
(Count does not include cover sheet) iJ
/5/ r
11111111111111 "III
NO
WlP
/s/
YES
NO
/5/
11111111111I1111111
ReScanned
BY:
Maria
Date:
/5/
Comments about this file:
11111111111111 "III
Quality Checked
111111111111 111111I
1 0/6/2005 Well History File Cover Page.doc
06/27/08
"~ChI~1111bG1'I~~1'
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
wpo . i.,ti ,~
NO.4763
,~~~i~~y 6~ Company: State of Alaska
~~li~l~ ~~~ ~" ~ ~~~~ Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
N-04A 11962603 PRODUCTION PROFILE .c ;a~'T..-. jf,,~~.: ~~°a
•~ 06/23/08 1 1
L2-06 11999020 PRODUCTION PROFILE ° ~~ .._ F..g':~
_~•, 06/15/08 1 1
L3-31 12005214 MEMORY SBHP ~"~ •_'~~ ° ° ~,,~Qy~a ,~ ~5,^j~>°:"" 06/11/08 1 1
C-02 11982437 PRODUCTION PROFILE °'} ` ~ (-. -' ~ r * , n °' °' 06/20/08 1 1
E-39A 12066529 SCMT ~ ~"'%`'~;? 06/19/08 1 1
MPC-09 12005215 MEM PROD PROFILE 1co~- -• ~, `~ (,,,~ 6 fir, ra ~~~t 06/12/08 1 1
W-31 12014027 LDL ~ `~1 a~ - ~ ~= " ' ~" ~`~ `~ `'~ `"~ 06/15/08 1 1
02-04A 11962602 USIT a~ .- s's'~ ~~ . • ~ ~-~~,~ a''~ 06/22/08 1 1
02-04A 12086662 USIT ? '} M _. / ~~~"- ~; ~^„ ~~; ~.~ 06/20/08 1 1
. ~~~...- .-........+..~~.+.,.- .,~.,"r . .,.. v..anu..., n.vv nc i vnnnv~a vwc ~,vr r cra~,n ~ v:
BP Exploration (Alaska) Ina ^ ' °"
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
iris
Date Delivered: - "
Alaska Data & Consulting Services ;°
2525 Gambell Street, Suite 40Q~ i
Anchorage, AK 99503-2838 '
ATTN: Beth , •
a d' ~
: ~
Received by: n ` . - -
•
;~
•
-~.,,.
MICROFILMED
03/01120018.
DO NOT PLACE
N
~ ~~
~,~
~~ ,
...
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs_Inserts\Microfilm Marker.doc
,'\.t-'-'-"
. . OCT 2 3 2006
STATE OF ALASKA . .' . .'.. C}ffimí~s¡on
ALASKA Oil AND GAS CONSERVATION COMMISSION\lasIŒ ml & Gas Lons. I.} . - "
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed: Repair WellŒ OtherD
Abandon 0 Plu: PerforationsD Stimulate 0
Alter CasingD Pull TubingD Perforate New PoolO WaiverD Time ExtensionD
Change Approved ProgramD Operation ShutdownD Perforate 0 Re-enter Suspended WellD
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ]] ExploratoryD 204-040
3. Address: P.O. Box 196612 6. API Number
Anchorage, Ak 99519-6612 StratigraphicO ServiceD 50-029-22587-01-00
7. KB Elevation (ft): 9. Well Name and Number:
65.60 E-39A
8. Property Designation: 10. Field/Pool(s):
ADL-028304 Prudhoe Bay Field / Prudhoe Oil Pool
11. Present Well Condition Summary:
Total Depth measured 12118 feet
true vertical 8948.0 feet Plugs (measured) WFR IBP set @ 9975 (06/10/2005)
Effective Depth measured 9975 feet Junk (measured) None
true vertical 8872.0 feet
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 107 20" 91.5# H-40 36 - 143 36.0 - 143.0 1490 470
SURFACE 3604 9-5/8" 40# NT80 35 - 3639 35.0 - 3624.0 5750 3090
PRODUCTION 10033 7"26# L-80 33 - 10066 33.0 - 8892.0 7240 5410
LINER 166 4-1/2" 12.6# L-80 9995 - 10161 8877.0 - 8907.0 8430 7500
LINER 2791 2-3/8" 4.7# L-80 9327 - 12118 8428.0 - 8948.0 11200 11780
;"CANNEr: ç) C zr,p¡
Perforation depth: ,,,",,,. ,\L .'- t.. "" UvJ
Measured depth: 11630-11805,11890-12040
True vertical depth: 8936-8959, 8955-8947
Tubing ( size, grade, and measured depth): 3-1/2" 9.2# L-80 @ 30 - 9347
Packers & SSSV (type & measured depth): 7" Baker S3 Packer @ 9291
3-1/2" HES SSSV Landing Nipple @ 2187
12. Stimulation or cement squeeze summary:
Intervals treated (measured): RBDMS 8Ft OCT 2 ;) 1006
Treatment descriptions including volumes used and final pressure:
13 Representative Dailv Averaqe Production or Iniection Data
Oil-Bbl Gas-Mef Water-Bbl Casinq Pressure TubinQ Pressure
Prior to well operation: SI 0 0 --- 0
Subsequent to operation: SI 0 0 --- 0
14. Attachments: 15. Well Class after proposed work:
ExploratoryD DevelopmentŒ] ServiceD
Copies of Logs and Surveys run _ 16. Well Status after proposed work:
Daily Report of Well Operations _ ~ OilŒ] GasD WAG 0 GINJD WINJD WDSPLD
Prepared by DeWayne R. Schnorr (907) 564-5174.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt:
Contact DeWayne R. Schnorr N/A
Printed Name DeWayne R. Schnorr ~ Title Petroleum Engineer
Signature ~~_.. d:? ~ j¿' Phone 564-5174 Date 10/20/06
v
Form 10-404 Revised 4/2004n R I r:; 11\ I fj I
.
.
E-39A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
09/14/2004 POH, verify data. Good data. MU and RIH with SCMT. Log 2 up passes from 12030' - 9330'
ctm while pumping filtered KCL water. POOH while displace tubing w/ crude. Retrieved
good data. RDMO
OS/28/2005 ***WELL S/I ON ARRIVAL*** (pre-squeeze) DIRFT W/1.75" CENT & 1.25" SB TO DEV @
10010' SLM. (TARGET 9975') PULLED LGLV's STA #1 @ 7449' SLM & STA#2 @ 4235'
SLM SET DGLVW/ EXT. PACKING BACK IN STA#1,#2
OS/29/2005 (Dmy off glm's) RE-SET DGLV @ STA#1 W/ EXT. PKG PULLED XC-SUB @ 9255' SLM
***WELL LEFT S/I***
05/31/2005 TI0=SSV/1630/20, SI. IA FL @ 5040' (127 bbls). Pre MITIA.
06/02/2005 T/I/O= 1450/1620/40 MIT IA to 3000 psi (PASSED) [Pre-Sqeeze] Filled & Pressued up IA w/
62 bbls of crude. IA PASSED on 2nd Attempt. IA lost 60 psi in 15 mins, IA lost 30 psi 2nd
15 mins, Lost a total of 90 psi in 30 mins. Bled IA RDMO Final WHP's 1450/1680/40
06/09/2005 TII/O = 1540/1900/10. SI. TBG FL (pre-IBP). TBG FL @ 4260' = Sta # 2.
06/10/2005 Log correlated to Memory Cement Bond Log, 13 Sept 04, Ran Weatherford Inflatable
Retrievable Bridge Plug set with center of element at 9975'. - fish info -- 1" fishing neck
(1.375 JDC with modified core kept at wireline bldg) oal 7.0'
06/15/2005 ***WELL SHUT IN ON ARRIV AL*** ( pre sqz ) ssv & master valve s/i. RAN 1.75 CENT
AND SB TO 9940' (SLM) (TOP OF IBP), SB EMPTY, FINE MARKS ON BOTTOM. RAN 10'
X 1.5, D.BAILER AND 1.75 CENT DUMPED SLUGGITS ON TOP OF IBP.
06/16/2005 (PRE SQZ) ORIGNAL TAG OF IBP 9940' (SLM), 9971.2' ELM, 31.2' CORRECTION.
DUMP BAILED 13' OF SLUGGITS W/10' * 1.5" D.BAILER,1.75 CENT. TAGGED
SLUGGITS W/1.75 CENT, SB @ 9927' (SLM), 9958.2 ELM. *** WELL LEFT SHUT IN
AND TURNED OVER TO DSO ***
06/25/2005 CTU #9 w/1.5" CT. MIRU MU 1.75" BDJSN and RIH. Attempt to knock down WHP, bleed
gas and RIH. Tag top of sluggits at 9961' correct to ELMO. Heavy overpull (+ 26k) off
bottom. PU to 9321 and circ bottoms up.
06/26/2005 CTU # 9 w/1.50" coil. Circulate bottoms up with 260 bbls filtered 1 % KCL. Perform 10 bbl
injectivity test. 1.0 bbl/min at 2150 psi. Perform MIT IA to 2000 psi due to large void last
night during fill up. Passed. POOH to change tools. RIH with 1.50" BJN. Pump 10 bbls 15 %
HCL. Injectivity increased to 1.0 BPM at 1075 psi. Load backside with 47 bbls diesel while
batching up and QC'ing 25 bbls 15.8 ppg cement. Pumped 25 bbls 15.8 ppg cement and
well locked up immediately after cement exited the nozzle. Layed in cement and pulled to
safety while maintaining -2350 psi WHP (1350 initial WHP before cement reached nozzle).
Pressured up to 2500 psi WHP. WHP dropped from 2515 psi to 2468 psi in 30 minutes.
Lined up and contaminated from WCTOC at 6730' to IBP at 9959' ctm. Jetted IBP and
chased out, RBIH and re-tagged while pumping bio. Layed bio from IBP to 9275' ctm.
Contaminate all cement with a total of 133 bbls 1.5# bio while making up/down passes and
chase OOH at 70% while jetting all mandrels, jewlery, tree and BOP's. RU WFRD 1.81" 00
MHA wireline pulling tools w/bell guide.
Page 1
.
.
E-39A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
06/27/2005 CTU # 9. Fish IBP w/1.50" coil. RIH with WFRD GS-spear. Tag up on top GLM and could
not work through. POOH to reconfigure tool string. Freeze protect tubing to 2500' . Standby
for SL to bait fish. SL baits IBP. RIH with WFRD 1.690" G-spear.
06/27/2005 *** WELL SHUT-IN UPON ARRIVAL*** BAITED IBP W/1.80 0.0 BAITSUB & 1 3/8 JDS-
UNABLE TO PULL W/ .108 WIRE.RDMO LEFT BAITED FISH FOR COIL, TOP OF FISH
@ 9976' SLM NOTIFY DSO *** TURN WELL OVER TO COIL ***
06/28/2005 CTU # 9. Fish IBP w/1.50" coil. RIH with WFRD 1.690" G-spear. Circ bottoms up to clean
off IBP. Latch in first try, complete 50 jar licks ( 27k) - 7k over with straight pulls. Attempt to
pump down backside could not establish any injectivty although WHP would bleed off
slowly. Made 50 total jar licks, pump off and POOH while keeping hole full. Cut 150' of pipe
and MU weld on connector, WFRD 1.690" 00 G-spear and RBIH. Latch up, make 1 jar lick,
cool top of IBP with 25 bbls 58 Deg SW, and latch up again and start jarring. Complete
another 25 jars licks without success. Pump off and circulate underbalance well with 91 bbls
diesel. Latch up, no problem, Complete another 25 jar licks without moving the IBP. POOH
to cut pipe and add EL weight bar to tool string.
06/29/2005 CTU 9 - Cut 151' pipe. Weld on new connector. RIH with WFRD & 1.690" 'G' spear.
Complete 20 jar licks. pressure tubing to 2100 psi, bleed down, rock pumps and ramp up
again. Latch up and try to jar. Could not move IBP. Pump off and PUH above liner. Order
Acid. PJSM for acid pumping. Spot 2 bbls 7 1/2 % HCL -let soak, inj acid downhole. Jar on
fish with 25 licks. no success, 8 jar licks down to shear JDC, no success, pump off POH.
Slickline will need to recover JDC and reset for 1.75" CT attempt. POH - FP well to 2500' -
Notify PO/PCC of well SI status RDMO **** Job Incomplete ****
07/03/2005 *** WELL SI ON ARRIVAL *** RIGGING UP SURFACE EQUIPMENT *** JOB IN
PROGRESS ***
07/04/2005 (fish ibp, gl, post sqz) ATTEMPTED TO PULL IBP FROM 9978' SLM W/ NO SUCCESS-
RECOVERED BAITSUB & 1 3/8"JDS SET 2.75" X-LOCK C-SUB @ 9259' SLM. PULLED
DGLV FROM STA #2--- 4239' , MADE SEVERAL ATTEMPTS TO PULL STA #1 *** JOB IN
PROGRESS ***
07/05/2005 (generics, fish ibp, post sqz) PULLED DGL V FROM ST A #1--- 7450' SLM & SET GENERIC
GL DESIGN PULLED EMPTY C-SUB FROM X-NIP @ 9259' SLM FLOW WELL W/ POOR
BOY GL FOR THREE HRS. TAG FLUID @ 1700'. CONTINUED TO FLOW WELL W/
POOR BOY GL TO TRY & UNLOAD WELL *** JOB IN PROGRESS ***
07/06/2005 T/I/O=1400/1300/0. SI. TBG & IA FL (for wireline). TBG FL @5860' (51 bbls). IA FL @
7192' (184 bbls). Final WHPs=1400/1300/290
07/06/2005 FLOWED WELL FOR 9 HRS, TAG FLUID LEVEL @ 6500' SLM TAG TOP OF IBP @
9976' SLM W/1.80 LlB- CEMENT IMBEDDED IN FACE OF LIB. FLUID LEVEL SHOT TBG
= 5860' /IA = 7192'. FLOW WELL W/ OUT GL. RDMO FOR RIG JOB. ***NOTIFY PAD OP
& PCC TO LEAVE WELL SHUT-IN***
Page 2
.
.
E-39A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
07/12/2005 CTU #4,1.75" Coil, Fish WFD 1-11/16" IBP. MIRU CTU#4. RU and perform weekly BOP
test. RIH with WFD G-Spear baited with 1.80" bait sub & 1 3/8" JDS. Tag fish at 1160'.
Confirmed that fish was fullbore by pumping down backside; pumped 5 bbls and WHP
came up to 750 psi and slowly bleed off. Decided to POOH suspecting we had latched IBP;
Up weight indicated we were dragging something to surface. As tools were passing tree
valves, G-Spear actuated due to trapped pressure and IBP went downhole. After inspecting
tools on surface, G-Spear equalization ports were clogged, tool was stuck in "release"
position, and tool had to be bled in order to return it to normal position. *** IBP left in hole,
baited with 1.80" bait sub & 1 3/8" JDS. *** Well left SI. RD for SL.
07/14/2005 ***WELL S/I ON ARRIVAL*** (PULL IBP) ATTEMPTED TO PULL IBP, STOPPED DUE TO
DEVIATION. RAN ROLLER STEM TO 9970' SLM. UNABLE TO PULL IBP ***WELL LEFT
S/I***
07/15/2005 CTU#4: FISH IBP. ***Well SI Upon Arrival*** MIRU. Secure well for the night.
07/16/2005 CTU#4: FISH IBP. ***WeJl SI Upon arrival*** MU/RIH w/ WFD 2" GS to fish IBP. Recovered
JDS Bait sub, both dogs were broken off and wedged inside G-fishing neck. Small piece of
metal from dog left downhole 1" x 3/8" x 1/8". Redress Bait sub and GS and RBIH. RIH w/
JDS Bait sub on 2" GS spear. Latch plug and jar 30 licks up to 13K over w/ straight pulls up
to 22k over. Shear off plug and POOH. Secure well for the night.
07/17/2005 T/I/0=250/1100/10. Temp=SI. T FL. (For CT, on location.) T FL @ 1740' (15 bbls).
07/17/2005 CTU#4: FISH IBP. RIH w/ WFD fishing BHA. Latch IBP and jar up w/7klbs over. Tools
came free, POOH. JDC was sheared. Suspect fish may have come free and blown up hole
to shear pin. Will return tomorrow to attempt to latch fish.
07/18/2005 CTU#4: Fish IBP. RIH w/ WFD 2" GS and 1-3/8" JDS bait sub. Jar up 8 times w/16Klbs
overpull and slip off fishing neck. Jar down 15 times w/ 5k slack off. POOH. Recovered bait
sub, dogs were rounded off on JDC, suspect fishing neck is starting to strip. RIH w/ WFD 2"
GS and bait sub w/1. 75" Obannon overshot with intention of spotting acid and jarring
up/down on fish. Latch fish and slip off with only 4klbs overpull. Unable to latch back on to
fish. Decide not to pump acid. POOH, freeze protecting down backside w/50/50 MeOH.
*** Job Incomplete***
07/26/2005 WF IBP MONTHLY RENTAL FOR 07/10/05 - 08/08/05, MO 2. NOTE: IBP SET ON
06/10/05
08/20/2005 *** WELL SI ON ARRIVAL *** (fish ibp) TAGGED HYDRATES @ 20' SLM *** JOB IN
PROGRESS ***
08/21/2005 (fish ibp) TAGGED TOP OF FISH @ 9976' SLM W/1.70 LIB, IMPRESSION OF TOP IBP
***LEAVE WELL SHUT-IN, CONTACT DSO***
08/30/2005 WF IBP MONTHLY RENTAL FOR 08/09/05 - 09/08/05, MO 3. NOTE: IBP SET ON
06/10/05
09/23/2005 WF IBP MONTHLY RENTAL FOR 09/09/05 - 10/09/05, MO 4. NOTE: IBP SET ON
06/10/05
Page 3
.
.
E-39A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
10/12/2005 T/I/O= 850/2000/0 [IBP in tubing] Pumped 7.5 bbls of neat meoh down tubing. Pressured up
to 3000, acted like pumping against ice. FWP's=3000/2000/0
10/17/2005 ***WELL S/I ON ARRIVAL*** SSV DUMPED DRIFT W/1.75 CENTRALIZER & S-BAILER
TO 832' SLM, BAILER FULL OF HYDRATES WELL LEFT S/I
06/25/2006 WF IBP MONTHLY RENTAL FOR 05/10/06 - 06/10/06, MO 12 (FINAL) NOTE: IBP SET
ON 06/10/05
BBLS
4 Diesel --- PT Surface Equipment
8 Neet Methanol
15 Methanol
269 50/50 Methanol Water
256 Diesel
144 Crude
90 Sea Water
10 Fresh Water
696 1 % KCL Water
532 1 % Extra Slick KCL Water
30 1 % KCL Water with 3% Lubetex & 1.5% EMI 775, 0.25 ppb Flo-Vis
10 15% HCL Acid
2 7-1/2% HCL Acid
133 1.5# Biozan
25 15.8 PPG LARC Cement System
2224 TOTAL
FLUIDS PUMPED
Page 4
" TREE = 4-1/16" 5M CIW
WELLHEAD = 9-5/8" 5M FMC
ACTUA TOR = BAKER
~ KB. ELEV = 66.05'
BF. ELEV = 30.50'
KOP = 3397'
Max Angle = 98 @ 11492'
Datum MD = 9955'
Datum TVD = 8800' SS
E-39A
.
9-5/8" CSG, 47#, NT-80, ID = 8.681" I
Minimum ID = 1.920" @ 9333'
TOP OF 2-3/8" LINER
13-1/2" TBG, 9,2#, L-80, .0087 bpf, ID = 2.992" I
9347'
TOP OF 4-1/2" LNR I
7" CSG, 26#, L-80, ID = 6.276" I
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3,953" I
10932'
PERFORA TION SUMMARY
REF LOG: SPERRY SUN MIND ON 09/23/95
ANGLEATTOPPERF: 81 @ 11630'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
1-11/16" 6 11630 - 11805 0 03/28/04
1-11/16" 6 11890 - 12040 0 03/28/04
NOTES:
2187' 13-1/2" HES SSSV LA ND NIP, ID = 2.75" I
GAS LIFT MANDRELS
ST MD TVD DBI TYÆ VLV LATCH PORT
2 4257 4131 28 CAM DOME RK 16
1 7466 6743 36 CAM SO RK 20
DATE
07/05/05
07/05/05
9279' H 3-112" HES X NIP, ID = 2.75"
9291' -17" X 3-1/2" BKR S3 PKR, ID = 3,875" I
9316' -l3-1/2" HES X NIP, ID = 2.75"
9327' 12.7" BKR DEA..OYMENT SL V, ID = 2,0"
9335' 13-1/2" HES X NIP, ID = 2.75" (BB-iIND CT LNR)
9347' 13-1/2" WLEG, ID = 2.75" (BEHIND CTLNR)
9350' H ELMD TT LOGGED 03/31/96
1WFR IBP (06/10/05) I
I MILLOUTWINDOW 10161' - 10169'
I 2-3/8" LNR, 4.7#, L-80, .0039 bpt, ID = 1.995" I
DATE
10/07/95
03/28/04
04/13/04
OS/28/05
07/05/05
OS/20/06
RBI BY COMMENTS
ORlG HORIZ COMPLETION
KAK CTD SIDETRACK (E-39A)
JU/KAK GLV C/O
KSB/PJC GLV C/O
KDClPJC GL V C/O
JRP/PJC WFR IBP (SET 06/10/05)
DATE
REV BY
COMMENTS
PRUDHOE BAY UNIT
WELL: E-39A
PERMIT No: "2040400
API No: 50-029-22587-01
SEC6, T11N, R14E, 1921.74' FNL & 501' FEL
BP Exploration (Alaska)
J- r A-,rd ^ð~b
DATA SUBMITTAL COMPLIANCE REPORT
3/2/2006
Permit to Drill 2040400
Well Name/No. PRUDHOE BAY UNIT E-39A
Operator BP EXPLORATION (ALASKA) INC
~-----"~
MD 12118/ TVD 8948 '" Completion Date 3/28/2004'-
Completion Status 1-01L
Current Status 1-01L
~---
-"-"-_._--~-~~~~----
REQUIRED INFORMATION
51' ~ ~ ~ f'\o.,.. ~i
API No. 50-029-22587-01-00
UIC N
Directional survey~--=._
Mud Log No
Samples No
---~-~-"-
----~--~----
DATA INFORMATION
Types Electric or Other Logs Run: SGRC Combined GR & EWR, MGR / CCL / CNL
Well Log Information:
Electr
Dataset
Number
V Lis
V
I
C Tf
(data taken from Logs Portion of Master Well Data Maint
OH/
CH Received Comments
4/23/2004 An H2S Measurement is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 3/9/2004.
4/23/2004 A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 3/9/2004.
GR, ROP, MWD
GR, ROP, MWD, DSN
12636
MEMORY CEMENT
BOND
LOG/GR/CCUSCMT/MAX
TEMP 190F.
MEM GRlCCLlSTP
MEMORY CNLlCCLlCNL
MEMORY CNL/CCLlCNL
Name
Directional Survey
Log Log
Scale Media
Interval
Start Stop
Run
No
Directional Survey
12636 Gamma Ray
LIS Verification
9900
9900
12117 9/3/2004
12117 9/3/2004
Cement Evaluation
Blu
9352
12060 Case 11/6/2004
Well Cores/Samples Information:
Tf
Gamma Ray
12869 Neutron
12869 Neutron
Leak
13108 Neutron
2 Blu 9198 12048 11/24/2004
01 9190 12059 11/29/2004
2 Blu 01 9190 12059 11/29/2004
2 Blu 1 9198 12048 2/3/2005
9198 12048 4/28/2005
Sample
Interval Set
Start Stop Sent Received Number Comments
Name
.
.
mem borax log/mem
gr/ccl/cnl
MCNL
Permit to Drill 2040400
MD 12118 TVD 8948
ADDITIONAL INFORMATION
Y(Ù
Well Cored?
Chips Received? Y / N
'r~
Analysis
Received?
DATA SUBMITTAL COMPLIANCE REPORT
3/2/2006
Well Name/No. PRUDHOE BAY UNIT E-39A
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-22587-01-00
Completion Date 3/28/2004
Completion Status 1-01L
Current Status 1-01L
UIC N
Daily History Received?
(y)N
'G/N
Formation Tops
Comments:
Compliance Reviewed By:
4u
Date: ;Z u¡ A-p ;( ~ ~ ~
.
.
.
.
WELL LOG TRANSMITTAL
£)64- 64-D
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
February 17, 2006
/3031
RE: MWD Fonnation Evaluation Logs E-39A,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
E-39A:
LAS Data & Digital Log Images:
50-029-22587-01
1 CD Rom
~
J/ :19"ID1P
:;Zþ,",c/ - ó c¡: 0
01/24/05
Schlumberger
NO. 3318
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
.
/i:~ ~ t
/~1~ IJ
tq5~tJ 2.
'YJ:f.-¡t1
"e-D1
,'Cfq -Of;
~-ø
¡15~O
.?o'l·j.D
~t)i'¡. iC(¡
:D"-'&W
1j,:7~
15- t0J
(Dtt-2.-1
.
e 0 OQ escrlPtlon a e ue me rm s
"7r. C-29A 10715422 MCNL 08/20/04 1
i E-25 10715423 MCNL 08/21/04 1
q G-02A 10715424 MCNL 08/23/04 1
W-27 A 10670031 MCNL 08/24/04 1
~~ D-25A (----... 10854314 MCNL 08/27/04 1
.," OS 15-25A " 10715428 MCNL 09/11/04 1
'h: E-39A 10715430 MCNL 09/13/04 1
02-16B 10928597 MCNL 10/02/04 1
I C-25A 10928598 MCNL 10/03/04 1
1 E-17A I 10928602 MCNL 10/30/04 1
~ C-41A J 10928606 MCNL 11/24/04 1
',- OS 07 -30A / 10715445 MCNL 12/09/04 1
't. OS 15-38A I£. 10715446 MCNL 12/11/04 1
,of 02-28A 10928607 MCNL 12/11/04 1
, D-11A 10928608 MCNL 12/16/04 1
1) OS 05-24A 10928609 MCNL 12/22/04 1
Prints_ only-Job not complete)
W II
J b #
L 0
'f
o t
BI r
Color
P' t
CD
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
~ih$'
Alaska Data & Consulting Services
2525 Ga. mbell Stree~, Suit 00... ~.
Anchorage, AK 9950 38 1)
ATTC' , / t
\ . //
( /
Rece' .~d by:' ., 'V'
, {I
11/23/04
Schlumbergel'
NO. 3277
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
.
~
,
IDtJ
2/J
1df.-
20
1..D
]JIi
)dI
~
...do W-05A Well Job# oa escription ate ue me rmts
10715426 CH EDIT (PDC-GR) 09/02/04 1
~~ L3-02 10708048 RST-SIGMA 02/05/04 1 1
-<i OWDW-SW 10563038 RST -SIGMA 03/30/03 1 1
--,. OWDW-SW 10672360 RST-BORAX 03/27/04 1 1
tf ,(J'; P1-07A 10621778 US IT (PDC) 04/20/04 1 1
rn J-25A 10715419 MCNL 08/13/04 1 1
<(,Io't C-25B 10715434 MCNL 10/11/04 1 1
t{..{)71 S-14A 10884020 MCNL 09/18/04 1 1
,Oft) E-39A 10728394 MCNL 03/28/04 1 1
-/1.'0 07 -32B 10861926 MCNL 08/03/04 1 1
If,CIf I Q-05A 10715356 MCNL 10/26/03 1 1
~ OS 09-41 10563111 RST-SIGMA 10/12/03 1 1
.
L 0
D
BI r
Color
P'
CD
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
// h9 ~f
., J
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 9950}-%838
ATTN: Beth I /I
Date Delivered:
11/16/04
Schlumberger
NO. 3256
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
.
Color
.N:ff.
~ Well Job# Log Description Date Blueline Prints CD
~ E-39A 10715430 MEMORY IPROF & WARMBACK 09/13/04 1
',()l ~ D.S. 15-25A 10715428 MEMORY PPROF & IPROF 09/11/04 1
\~q;, C-25A 10928596 MEMORY LDL 09/27/04 1
C-25A 10928598 MEMORY LDLlIPROF 10/04/08 1
J ,..- L2-14B 10670029 PRODUCTION PROFILE 08/20/04 1
....... F-11 B 10928600 MCNL 10/20/04 1 1
J ð'f." ,I
~\~th L2-07 A 10861911 MCNL 05/31/04 1 1
-e-07 A 10715409 MCNL 06/07/04 1 1
~~ F-28A 10670015 MCNL OS/22/04 1 1
L3-05 10724368 RST-SIGMA 04/02/04 1 1
L3-05 10662981 RST-SIGMA 01/08/04 1 1
~'~ L3-05 10866588 RST-SIGMA 09/03/04 1 1
~ t L3-05 10672320 RST-SIGMA 09/28/03 1 1
f(£. ~ ¡sa L3-02 10560313 RST-SIGMA 10/16/03 1 1
let) ,.( OWDW-NW 10563037 RST-SIGMA & BORAX 03/29/03 1 1
OWDW-NW 10672361 RST-BORAX 03/28/04 1 1
.¡;
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, 99503-2838
ATTN: Bet
Date Delivered:
/(-2t{- 0'1
r./
.
~~)i- ¿) 'fo
11/05/04
Schlumbel'ger .
NO. 3252
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Robin Deason
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
~'-
I~. Well Job # Log Description Date Blueline Prints CD
10831305 LEAK DETECTION LOG 07/05/04 1
-Ie:>' L5-15 10913848 SBHP SURVEY 09/26/04 1
~'t S-06 10621828 INJECTION PROFILE 10/01/04 1
I~C. W-30 10866597 PPROFILE W/DEFT/GHOST 09/26/04 1
.rn C-23B 10558571 MCNL 09/01/03 1 1
..ë/t i:-39A 10715430 SCMT 09/13/04 1
~'Z F-11 A 10893034 SCMT 09/16/04 1
15-25A 10715429 SCMT 09/12/04 1
j" 15-09A 10889178 SCMT 10/17/04 1
./13 NGI-11 10912989 USIT 10/26/04 1
r{i
~-
"
.-(1
~
1.0
3
.,~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
I~~~¥
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 9950 -2838
A TTN: Beth
e
-
...~~"I~"
/Z¿,3 ç
WELL LOG TRANSMITfAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn. :-:R.obil1 Dettseft ~
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
August 23, 2004
RE: MWD Fonnation Evaluation Logs E-39A,
AK-MW-2976242
1 LDWG fonnatted Disc with verification listing.
API#: 50-029-22587-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: 1 b /0 cf
f ~
Si
RECEIVED
SEP 0 ,) 2004
.e 011 & Gas Cons.Commisston
Anchorage
. STATE OF ALASKA e
ALASKA~L AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR REcOMPLETION REPORT AND LOG
1a. Well Status: IS! Oil DGas o Plugged o Abandoned o Suspended o WAG 1b. Well Class:
20AAC 25.105 20AAC 25.110 IS! Development o Exploratory
DGINJ DWINJ o WDSPL No. of Completions One Other o Stratigraphic Test o Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 3/28/2004 204-040
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 3/20/2004 50- 029-22587-01-00
4a. Location of Well (Governmental Section): 7. Date T. D. Reached 14. Well Name and Number:
Surface: 3/25/2004 PBU E-39A
3358' NSL, 501' WEL, SEC. 06, T11N, R14E, UM 8. KB Elevation (ft): 15. Field / Pool(s):
Top of Productive Horizon:
683' NSL, 375' WEL, SEC. 06, T11 N, R14E, UM 65.6' Prudhoe Bay Field / Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD+ TVD) Pool
163' NSL, 1149' EWL, SEC. 05, T11N, R14E, UM 12074 + 8947 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 664489 y- 5975142 Zone- ASP4 12118 + 8948 Ft ADL 028304
TPI: x- 664683 y- 5972471 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 666220 y- 5971986 Zone- ASP4 (Nipple) 2187' MD
18. Directional Survey 19. Water depth, if offshore 20. T~~rrJa~~_"
IS! Yes DNo N/A MSL 1 'LV "'IT"'" "b
21. Logs Run: ,-
SGRC Combined GR & EWR, MGR 1 CCL 1 CNL M.ðY fl7 "A
22. CASING, LINER AND CEMENTING RECORD - . 'VV'f
"r'^"".,,,, SrnING'"DEF"OiMP SETTING DEPtHtVD ~?-1g' c~
"srif WT. PER FT. GRAbe Top BOTTOM ToP BOTTOM
20" 91.5# H-40 Surface 107' Surface 107' 30" 260 sx Arctic Set A .
9-5/8" 40# NT80 35' 3639' 35' 3624' 12-1/4" 1020 sx CS III, 306 sx Class 'G', 225 sx CS II
7" 26# L-80 33' 10066' 33' 8892' 8-1/2" 96 sx Class 'G'
4-1/2" 12.6# L-80 9995' 10161' 8877' 8907' 6" 140 sx Class 'G'
2-3/8" 4.7# L-80 9327' 12118' 8428' 8948' 3" 121 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 124. TUBINÓRECORD ",
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
1.56" Gun Diameter, 6 spf 3-1/2", 9.2#, L-80 9347' 9291'
MD TVD MD TVD
11630' - 11805' 8936' - 8959' 25, ACID, CEMENT ¡::T~L ,
11890' - 12040' 8955' - 8947' ,
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
2000' Freeze Protect with MeOH
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
April 20, 2004 Flowing
Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-BSl CHOKE SIZE GAS-Oil RATIO
5/2/2004 4 TEST PERIOD .. 207 2,749 -0- 96° 13,311
Flow Tubing Casing Pressure CALCULATED .. Oll-Bsl GAs-McF WATER-BSl Oil GRAVITY-API (CORR)
Press. 339 89 24-HoUR RATE 1,239 16,491 -0-
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". , , !
,----··-"'-·..'·---1 ! I
t crWf"q,(),,! , ~
, ." ,..~-, j ".
None I j' ~~~ ¡ RBDMS 8fL .. 1'0 100~
I ~Dr
,--_/' ;,,,,,,," j{\ ¡.._..
.~
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
~~G
28~
GEOLOGIC MARKERS
29.
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Zone 1 B
10266'
8932'
None
Zone 1 A
12277'
8957'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed
Terrie Hubble
Title
Technical Assistant
Date
S·OCo-o
PBU E-39A
Well Number
204-040
Permit NO.1 A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Mary Endacott, 564-4388
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00·00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
3/15/2004
3/29/2004
N1
Spud Date: 9/15/1995
End: 3/29/2004
3/18/2004 03:00 - 06:30 3.50 MOB P PRE Rig released from F-46A @ 03:00Hrs on 3/18/2004. Prep to
move rig off well. Clean cuttings box.
06:30 - 07:00 0.50 MOB P PRE Held pre-move safety meeting with crew, security & tool
services.
07:00 - 08:00 1.00 MOB P PRE Jack-up rig & pull rig off well. Move rig to pad entrance.
08:00 - 08:30 0.50 MOB N WAIT PRE W.O. tool services to plough snow drifts on access road, lay
mat boards & scarf slick areas.
08:30 - 12:00 3.50 MOB P PRE Move rig from F-pad to E-pad. Arrive @ E-pad & position rig in
front of E-39. Install dikes around tree. Meanwhile Litttle Red
Services load/kill E-39 with 255bbls KCL water & 30bbls
60/40MeOH prior to rig arrival - Final injectivity = 5bpm/950psi.
WHP before kill = 2450psi. lAP = 300psi. OAP = Opsi.
12:00-12:15 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig
over well.
12:15 - 12:30 0.25 MOB P PRE Back rig over well & set down. Accept rig @ 12:30Hrs on
3/18/2004.
12:30 - 14:30 2.00 RIGU P PRE N/U BOPE. Meanwhile spot outside trailers & tanks. R/U
hardline to tiger tank & P/test to 4000psi.
14:30 - 20:15 5.75 BOPSU PRE Grease tree valves & open SSV. Perform initial BOPE
functionlpressure test. AOGCC test witness waived by Jeff
Jones. Meanwhile fill rig pits with 2% KCL-water.
20:15-21:00 0.75 BOPSU P PRE Check well head pressure. Well head pressure is zero. Stab
injector onto well and circulate MeOH out of coil. Took 36 bbls
to fill the hole.
21:00 - 21:15 0.25 BOPSU PRE Unstab injector and pull back.
21:15 - 21:30 0.25 WHIP WEXIT PJSM for PU whipstock.
21 :30 - 23:00 1.50 WHIP WEXIT SWS install 3 RA tags in WS. MU Baker whipstock, setting
tool, FAIV, MWD, orienter, MHA. Fill hole, took 8 bbls.
23:00 - 00:00 1.00 WHIP P WEXIT RIH to 800'. SHT MWD and orienter at 0.9 bpm, 1,600 psi.
Continue RIH.
3/19/2004 00:00 - 02:00 2.00 WHIP P WEXIT RIH to 7,300'. Not getting returns while RIH. Circulate at 1
bpm down coil. Not able to get returns at 1 bpm. Fill hole
through kill line. Took 10 bbls to fill the hole. Continue RIH
pumping at .58 bpm, no returns. RIH to 9,310'.
02:00 - 02:40 0.67 WHIP P WEXIT Tie in to Sag River marker. +6' correction.
02:40 - 03:00 0.33 WHIP P WEXIT RIH to 10,189'.
03:00 - 03:40 0.67 WHIP P WEXIT Confirm tie in from 10,189' to 10,209'.
03:40 - 04:15 0.58 WHIP N SFAL WEXIT Attempt to orient WS. Unable to orient. Current TF is 164L.
Discrepency with MWD timelDepth file on 2nd tie in. Relog
from 10,189' to 10,209'. -5' correction. No returns during tie in
logs.
04:15 - 04:50 0.58 WHIP P WEXIT Place whipstock top at 10,185'. Increase pump rate to 1.87
bpm, 4,200 psi. Bleed off pressure and let sit for 1 minute.
Bring pump up to .9 bpm, 1,500 psi. FAIV is not shifted. Got a
click, TF=147L. Bleed off pressure and let sit for 5 minutes.
Bring up pump to 1.24 bpm, 2,205 psi. TF=125L.
04:50 - 05:10 0.33 WHIP P WEXIT Orient to 123R at 1.2 bpm.
05:10 - 05:20 0.17 WHIP P WEXIT Pump at 1.89 bpm, 4,750 psi. Bleed off pressure. Bring up
pump and set whipstock. Whipstock sheared at 2,100 psi. TF
after shearing off WS is 145R. Shut down pump and set down
2K. PU=33K.
05:20 - 06:00 0.67 WHIP P WEXIT POOH. Hanging up in jewelry while POOH. Pull through
nipples at 9,335' and 9,316' with 41K Ibs. POOH.
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
3/15/2004
3/29/2004
N1
Spud Date: 9/15/1995
End: 3/29/2004
3/19/2004 06:00 - 07:30 1.50 WHIP P WEXIT OOH. PJSM. SIB injector. UD whipstock setting BHA#1. Set
tool packed with asphaltenes.
07:30 - 08:10 0.67 ZONISO P WEXIT M/U cement squeeze BHA#2 with 2-1/4" nozzle, 2" CSH
Stinger, XIO & CTC. Stab injector on well. Meanwhile R/U
Dowell cementers.
08: 10 - 11 :00 2.83 ZONISO P WEXIT RIH with BHA#2 circ @ 2.7bpm/3700psi without returns. Start
seeing returns after pumping 26bbls. Continue RIH to 9500'
(below tbg tail) circ @ 1.2I0.2bpm & 850psi. Up wt check @
9500' - 31.5klbs. PUH into tbg tail to 9175' (above all
X-nipples) - no O/pulls. Continue RIH to WS pinch Pt tagged
2x @ 10157'. Correct CTD (+30') to 10187'. SLB mech depth
counter is 34' off while Sperry counter is 13' off. Review tie-in &
reconfirm W/S tag depth. PUH to 10175' & flag CT.
11 :00 - 11: 15 0.25 ZONISO P WEXIT PJSM with all personnel concerning cementing operations.
11:15-12:45 1.50 ZONISO P WEXIT Pump 5bbls of water ahead. PT cement lines to 4k. Pump
39bbls of 15.8ppg class G cmt slurry @ 1.95/0.65bpm &
3700psi. Follow with 5bbls of water behind. Chase with
KCL-water @ 1.5/0.60bpm & 1550psi. Pump 1 bbl of cmt
around nozzle. POOH laying in remaining cmt @ 1:1 to 8667'
(TOC). Observe returns gradually improve to 1:1 @
1.47/1.24bpm & 1000psi while laying-in cmt. CIP @ 12:30.
PUH to 7500'.
12:45 - 13:15 0.50 ZONISO P WEXIT SI choke & increase WHP to 1000psi. Hesitate-squeeze from
1000psi - 1500psi. Gradually increase squeeze pressure to
2000psi. Squeezed away ca. 1.5bbls cmt.
13:15 - 13:45 0.50 ZONISO P WEXIT Circ down 30bbls bio-KCL water to nozzle @ 2.2I2.2bpm &
holding 1000psi WHP.
13:45 - 14:20 0.58 CLEAN P WEXIT RBIH contaminating cmt @ 1:1 & 500psi WHP. Observe slight
CTP bump @ 8840' (TOe). Continue washing down to 10175'.
14:20-15:10 0.83 CLEAN P WEXIT Wash up to 8800' @ 2bpm/3500psi. Start getting contaminated
cmt on surface @ 8840' btms up. Out wt climb up to a max of
12ppg.
15:10 - 15:50 0.67 CLEAN P WEXIT Make additional 2 down & 1 up wash passes @
2.0bpm/2700psi.
15:50 - 17:45 1.92 ZONISO P WEXIT Jet OOH @ 2.0bpm/2700psi. Tag up with 36.6' CTD on SLB
depth counter - BHA length = 10.84'.
17:45 - 18:00 0.25 ZONISO P WEXIT OOH. UD cementing nozzle BHA#2.
18:00-19:15 1.25 CLEAN P WEXIT M/U swizzle stick. Stab on injector & jet BOP stack. Flush
surface lines.
19:15 - 19:30 0.25 CLEAN P WEXIT Pull back injector. LD swizzle stick.
19:30 - 19:45 0.25 STWHIP P WEXIT PJSM for PU window milling BHA.
19:45 - 20:15 0.50 STWHIP P WEXIT PU window milling BHA.
20:15 - 20:25 0.17 STWHIP P WEXIT Stab injector.
20:25 - 22:00 1.58 STWHIP P WEXIT RIH to 10,100'.
22:00 - 22:40 0.67 PXA P WEXIT Pressure up well bore to 1000 psi. Pressure bled off to 500 psi
in 2 minutes. Bleed off pressure. Open up well and circulate
at 1 bpm. Getting full returns. SI well and retest with same
results. Discuss with Anchorage.
22:40 - 22:46 0.10 STWHIP P WEXIT RIH to mill window. Tag at 10,161.5'. PU and retag.
22:46 - 23:00 0.23 STWHIP P WEXIT Mill to 10,161.7'. Stalled motor, pinch point. Correct depth to
10,187'.
23:00 - 00:00 1.00 STWHIP P WEXIT Time mill window from 10,187' to 10,188'.
I
I
Printed: 3/29/2004 8:47'21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/15/2004
Rig Release: 3/29/2004
Rig Number: N1
Spud Date: 9/15/1995
End: 3/29/2004
3/20/2004 00:00 - 06:00 6.00 STWHIP P WEXIT Continue time milling window. Motor stalls at 10,192.5'. Break
into formation at 10,192.6'. Mill formation to 10,203'. Tentative
window depths are: TOWS = 10185', TOW = 10187'; BOW =
10193', RA PIP Tag = 10192'.
06:00 - 08:30 2.50 STWHIP P WEXIT Backream/ream window/rat hole several times. Attempt to drift
window 2x without pumping - stacking out @ 10187' (TOW).
Ream/backream TOW area without motorwork. Drift again &
stack out @ TOW. Set down 3k. Roll pumps & fall thru window.
SID pump & drift rest of windowlrat hole OK. PUH dry - no
O/pulls. Suspect WS ramp may have been slightly shaved
while milling LS window & we're currently stacking out @
shaved area. Otherwise window looks clean.
08:30 - 09:30 1.00 STWHIP P WEXIT Continue drifting/reaming window while swapping wellbore to
reconditioned 8.6ppg flopro mud. Meanwhile Phase-1 declared
in all GPB main roads & pads.
09:30 - 11 :00 1.50 STWHIP P WEXIT Paint EOP flag @ 10000' & POOH window milling BHA#3.
11 :00 - 11 :45 0.75 STWHIP P WEXIT OOH. PJSM. SIB injector. Flush BHA. UD 2jts of 2-1/16" CSH
tbg, motor, diamond string reamer & window mill. Window mill
gauge 2.73" go /2.72" no-go & center wear indicates mill
crossed Inr wall. String reamer gauge 2.74" go 12.73" no-go.
11 :45 - 12:00 0.25 DRILL P PROD1 Held pre-spud operations/safety meeting. Reviewed well plan,
potential hazards & BHA M/U procedures. Also reviewed safety
& emergency procedures for handling Sperry MWD lithium
batteries.
12:00 - 13:00 1.00 DRILL P PROD1 M/U & lock tite drilling BHA #4 with used HYC DS100 2.7" x 3"
bicenter bit, 2deg BHI Xtreme motor, Sperry GR-DIR MWD,
orienter & BKR MHA (OAL = 59.58'). Scribe tools. M/U injector.
13:00 - 15:15 2.25 DRILL P PROD1 RIH drilling BHA #4. SHT MWD & orienter @ 1000' - OK.
Continue RIH. Correct +27' @ the flag. RIH dry & tag window
@ 10190'. PUH & orient TF from 20L to 100R. RBIH & set
down again @ widow. Orient to 136R & RIH clean thru window
with pumps off. Tag TO @ 10206'. Correct CTD to 10203'.
15:15-15:25 0.17 DRILL P PROD1 Orient TF to 174L.
15:25 - 16:10 0.75 DRILL P PROD1 Resume drilling with LS TF, 1.55/1.55bpm, 3350/3500psi,
20fph ave ROP. Drill to 10213' & see hi GR spike @ 10188'.
16:10-16:25 0.25 DRILL P PROD1 PUH to 9924' for tie-in log. GPB now in Phase-1 on all main
roads & Phase-2 on all pads & access roads.
16:25 - 17:15 0.83 DRILL P PROD1 Log down GR & tie-into formation marker @ 9945' - subtract
26' from CTD.
17:15 - 17:30 0.25 DRILL P PROD1 RIH clean thru window @ 162L TF with pumps off. Tag TO @
10187'.
17:30 - 18:15 0.75 DRILL P PROD1 Drill to 10215' with LS TF, 1.55/1.55bpm, 3350/3700psi, 20fph
ave ROP. See RA PIP Tag @ 10168'. Confirmed window
depths are: TOWS = 10161', TOW = 10163'; BOW = 10169',
RA PIP Tag = 10168'.
18:15 - 18:30 0.25 DRILL P PROD1 Orient TF to 20L.
18:30 - 20:35 2.08 DRILL P PROD1 Drill to 10,263'.
20:35 - 22:10 1.58 DRILL P PROD1 POOH to PU 1st lateral drilling assembly.
22:10 - 23:00 0.83 DRILL P PROD1 Pull back injector. Change bit and motor bend to 1.1 deg.
Check orienter, ok. Stab injector.
23:00 - 00:00 1.00 DRILL P PROD1 RIH.
3/21/2004 00:00 - 01 :00 1.00 DRILL IP PROD1 RIH. Orient to 130R. Run through window smooth w/o pump.
I
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/15/2004
Rig Release: 3/29/2004
Rig Number: N1
Spud Date: 9/15/1995
End: 3/29/2004
3/21/2004 00:00 - 01 :00 1.00 DRILL P PROD1 RIH to 10,200'.
01 :00 - 01 :30 0.50 DRILL P PROD1 Tie in to RA marker. +8' correction.
01 :30 - 02:45 1.25 DRILL P PROD1 Tag bottom at 10,263'. Drill to 10,292' at 1.5/1.53,180/3,400
psi.
02:45 - 03:25 0.67 DRILL N DFAL PROD1 Attempt to orient. Not getting clicks. Pull to window and try to
orient. Orienter not working. Tag bottom. PU and attempt to
orient.
03:25 - 05:00 1.58 DRILL N DFAL PROD1 POOH to change out orienter.
05:00 - 05:40 0.67 DRILL N DFAL PROD1 Pull back injector. Check bit, 0,0. Change orienter. Stab
injector.
05:40 - 07:30 1.83 DRILL N DFAL PROD1 RIH. SHT MWD & orienter - OK. RIH clean thru window @
160L TF with pumps off. Tag TO @ 10288'. Correct CTD to
10292'. GPB still in Phase-2 on all access roads & pads. Many
trucks got stuck in snow drifts while convoying to rig.
07:30 - 07:50 0.33 DRILL P PROD1 Orient TF to 60R. P/U wt = 29k, 8/0 wt = 14k. Freespin =
3720psi.
07:50 - 08:45 0.92 DRILL P PROD1 Drill to 10322' with 60-70R TF, 1.65/1.65bpm, 3720/41 OOpsi, 2k
WOB & 35fph ave ROP.
08:45 - 09: 10 0.42 DRILL P PROD1 Drill to 10332' with 70-90R TF, 1.55/1.55bpm, 3700/4300psi, 4k
WOB & 25fph ave ROP. TF rolling right.
09:10 - 09:25 0.25 DRILL P PROD1 Orient TF around to 50R.
09:25 - 10:25 1.00 DRILL P PROD1 Drill to 10368' with 60-80R TF, 1.55/1.55bpm, 3650/41 OOpsi, 4k
WOB & 40fph ave ROP. Landed 90degs inclination @ 10348'
(8872ftss).
10:25 - 11 :20 0.92 DRILL P PROD1 Orient 1 click & drill to 10409' with 90-120R TF, 1.6/1.6bpm,
3700/4100psi, 5k WOB & 45fph ave ROP. Geo wants to drill up
to 8868ftss to hunt for cleaner sands.
11 :20 - 11 :35 0.25 DRILL P PROD1 Orient TF around to 60R. PVT = 317bbls.
11:35-12:10 0.58 DRILL P PROD1 Drill to 10430' with 50-75R TF, 1.55/1.55bpm, 3670/4100psi, 5k
WOB & 35fph ave ROP. Geo wants to build to 92+degs
inclination.
12:10-12:45 0.58 DRILL P PROD1 Drill to 10450' with 60-80R TF, 1.55/1.55bpm, 3600/4000psi, 5k
WOB & 35fph ave ROP.
12:45 - 13:00 0.25 DRILL P PROD1 Wiper trip clean to window. RBIH to btm.
13:00 - 13:20 0.33 DRILL P PROD1 Orient TF around to 40R. Bled lAP from 775psi to 250psi &
OAP from 700psi to 80psi.
13:20 - 13:50 0.50 DRILL P PROD1 Drill to 10465' with 20R TF, 1.55/1.55bpm, 3700/4300psi, 5k
WOB & 35fph ave ROP.
13:50 - 14:05 0.25 DRILL P PROD1 Orient 1 click & drill to 10474' with 50-65R TF, 1.6/1.6bpm,
3700/4200psi, 7k WOB & 35fph ave ROP.
14:05 - 15:35 1.50 DRILL P PROD1 Orient 2 clicks & drill to 10520' with 85-100R TF, 1.6/1.6bpm,
3700/4250psi, 7k WOB & 30fph ave ROP. Inclination @
92.5degs - Geo wants to drop to 91 degs.
15:35 - 16:10 0.58 DRILL P PROD1 Orient 1 click & drill to 10545' with 130R TF, 1.6/1.6bpm,
3700/4200psi, 6k WOB & 50fph ave ROP.
16:10 - 16:25 0.25 DRILL P PROD1 Orient TF around to 80R. PVT = 304bbls.
16:25 - 16:50 0.42 DRILL P PROD1 Drill to 10559' with 75-85R TF, 1.55/1.55bpm, 3700/4050psi, 7k
WOB & 35fph ave ROP. Stacking wt.
16:50 - 17:00 0.17 DRILL P PROD1 Short 100' wiper. RBIH to btm.
17:00 - 18:10 1.17 DRILL P PROD1 Drill to 10600' with 75-85R TF, 1.55/1.55bpm, 3700/4050psi, 6k
WOB & 45fph ave ROP.
18:10 - 20:30 2.33 DRILL P PROD1 Wiper trip to tbg tail. Make two passes in 7" at max rate, 1.8
bpm, to clean hole. RIH. Orient to 125R, kill pump and set
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
3/15/2004
3/29/2004
N1
Spud Date: 9/15/1995
End: 3/29/2004
3/21/2004 18:10 - 20:30 2.33 DRILL P PROD1 down at window. Orient to 147R, set down at window. Orient
to 170R. Set down at window and pop through.
20:30 - 20:55 0.42 DRILL P PROD1 Drill from 10,600' to 10,614' at HS TF.
20:55 - 21:10 0.25 DRILL P PROD1 Orient to 80L
21:10 - 23:15 2.08 DRILL P PROD1 Drill from 10,614' to 10,662' at 60L - 80L. Stacking weight.
23:15 - 23:30 0.25 DRILL P PROD1 Wiper trip to 10,500'
23:30 - 00:00 0.50 DRILL P PROD1 Drill to 10,666'.
3/22/2004 00:00 - 02: 15 2.25 DRILL P PROD1 Drill from 10,666' to 10,723'.
02: 15 - 02:45 0.50 DRILL P PROD1 Orient to 90L.
02:45 - 03:40 0.92 DRILL P PROD1 Start new flo pro down coil. Drill to 10,750'.
03:40 - 04:15 0.58 DRILL P PROD1 Wiper trip to window. Hole in good condition.
04: 15 - 04:20 0.08 DRILL P PROD1 Orient to 90L.
04:20 - 06:15 1.92 DRILL P PROD1 Drill at 1.5/1.5 2,988/3,430psi. Drill to 10833'. Have new mud
all around.
06:15 - 06:40 0.42 DRILL P PROD1 Still stacking wt & pulling heavy - short wiper to 10600'. PIU wt
= 27k, S/O wt = 13k. Freespin = 1.5bpm/3000psi. PVT =
331 bbls.
06:40 - 08:15 1.58 DRILL P PROD1 Drill to 10877' with 115R TF, 1.6/1.6bpm, 3050/3600psi, 8k
WOB & 30fph ave ROP. Stacking wt.
08:15 - 08:30 0.25 DRILL P PROD1 Orient TF to 60-70R. Geo wants to build to 94degs incliation.
08:30 - 09:05 0.58 DRILL P PROD1 Drill to 10900' with 40R TF, 1.55/1.55bpm, 3000/33450psi, 8k
WOB & 40fph ave ROP. Call for 2% KCL water & mix 120k
LSRV mud for lo-vis/hivis hole sweeps.
09:05 -11:10 2.08 DRILL P PROD1 Wiper trip clean to window. Sweep hole with 2 batches of
10bbls hi-vis pill. Make 2 upldown passes in the 7" @ 1.8bpm
& continue wiping to 9000' - above tbg tail. Got back 50%
more than normal drilling cuttings over the shakers with 1 st
hi-vis slug & not much with 2nd slug.
11:10-11:30 0.33 DRILL P PROD1 RBIH @ 125R & tag @ TOW. Orient 2 clicks & RIH clean thru
window with pumps off. Tag TD @ 10892'. PVT = 328bbls.
11 :30 - 11 :40 0.17 DRILL P PROD1 Drill to 10911' with 90R TF, 1.6/1.6bpm, 3350/3800psi, 8k
WOB & 105fph ave ROP.
11 :40 - 12:55 1.25 DRILL P PROD1 Drill to 10950' with 130R TF, 1.6/1.6bpm, 3350/3750psi, 9k
WOB & 32fph ave ROP. TF very erratic with up to 180degs
reactive - seemed to have crossed a fracture zone into upper
zone 1A from 10932' to 10945'.
12:55 - 13:05 0.17 DRILL P PROD1 Drill to 10959' with 90R TF, 1.7/1.7bpm, 3450/3750psi, 7k
WOB & 50fph ave ROP. Lost reactive.
13:05 - 13:20 0.25 DRILL P PROD1 Drill to 10973' with 80-90L TF, 1.7/1.7bpm, 3450/3800psi, 7k
WOB & 75fph ave ROP.
13:20 - 13:35 0.25 DRILL P PROD1 Orient TF to 140L. Geo wants to drop to 90degs incl.
13:35 - 14:00 0.42 DRILL P PROD1 Drill to 11003' with 140L TF, 1.7/1. 7bpm, 3450/3850psi, 7k
WOB & 65fph ave ROP.
14:00 - 14:45 0.75 DRILL P PROD1 Orient 2 clicks & drill to 11039' with 90-110L TF, 1.7/1.7bpm,
3450/3800psi, 7k WOB & 50fph ave ROP.
14:45 - 15:00 0.25 DRILL N STUC PROD1 I Orient 1 click & got temporarily stuck. SID pump & wait for
5mins & work pipe free.
15:00 - 17:15 2.25 DRILL P PROD1 Wiper trip clean to window. Sweep hole with 2 batches of
10bbls lo-vis pi 11/1 Obbls hi-vis pill. Reciprocate & make 2
upldown passes in the 7" @ 1.9bpm. Wipe hole to 9000'. Got
back 50% more than normal drilling cuttings over the shakers
with 1st hi-vis slug & nothing with 2nd slug.
17:15 - 17:30 0.25 DRILL P PROD1 RBIH. Orient TF to 155R & RIH clean thru window with pumps
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/15/2004
Rig Release: 3/29/2004
Rig Number: N1
Spud Date: 9/15/1995
End: 3/29/2004
3/22/2004 17:15 - 17:30 0.25 DRILL P PROD1 off.
17:30 - 17:50 0.33 DRILL P PROD1 Tie in to RA PI P tag - + 16' correction.
17:50 - 18:05 0.25 DRILL P PROD1 RBIH to TO tagged @ 11045'. P/U wt = 27k, S/O wt = 14k.
Freespin = 1.5bpm/3200psi. PVT = 316bbls.
18:05 - 18:25 0.33 DRILL P PROD1 Drill to 11060' with 95L TF, 1.5/1.5bpm, 3200/3750psi, 6k WOB
& 35fph aye ROP. TF bouncing around. May be drilling faulted
area.
18:25 - 18:41 0.27 DRILL P PROD1 Drill to 11,075'.
18:41 - 19:00 0.32 DRILL P PROD1 Orient to 80R.
19:00 - 19:10 0.17 DRILL P PROD1 Drill to 11,091'.
19:10 - 19:30 0.33 DRILL P PROD1 TF dropped to 90R. Orient to 80R.
19:30 - 20:00 0.50 DRILL P PROD1 Drill to 11,123'. TF walking right.
20:00 - 20:17 0.28 DRILL P PROD1 Orient to 60R.
20: 17 - 20:50 0.55 DRILL P PROD1 Drill to 11,157'. TF fell to 135R.
20:50 - 21 :05 0.25 DRILL P PROD1 Orient to 80R.
21 :05 - 22:45 1.67 DRILL P PROD1 Drill to 11,200'.
22:45 - 23:50 1.08 DRILL P PROD1 Wiper trip to window. Hole in good condition.
23:50 - 00:00 0.17 DRILL P PROD1 Orient to 90R.
3/23/2004 00:00 - 00:20 0.33 DRILL P PROD1 Orient to 90R.
00:20 - 02:40 2.33 DRILL P PROD1 Drill at 1.5/1.5 I 3,370 13,900 psi. 90R TF. Geologist want to
drop. Orient and drill LS from 11,205' to 11,282'. Started
losing circulation at 11,276'. Pit volume 305 bbls. Pumping
1.45 bpm in getting 1.1 bpm out.
02:40 - 02:55 0.25 DRILL P PROD1 Orient to 80R.
02:55 - 03:15 0.33 DRILL P PROD1 Drill to 11,300 pumping 1.5/1.3 bpm, 3,780 psi.
03: 15 - 03:25 0.17 DRILL P PROD1 Orient to 74R.
03:25 - 04:00 0.58 DRILL P PROD1 Drill to 11,330' at 50R to 70R. Still losing at 0.2 bpm.
04:00 - 04:15 0.25 DRILL P PROD1 Orient to 30R.
04:15 - 04:45 0.50 DRILL P PROD1 Pit volume 271 bbls. Drill at 1.4/1.2 3,300/3,650 psi, 23R
TF=30R.
04:45 - 05:45 1.00 DRILL P PROD1 Wiper trip. Pit volume 259 bbls. Sweep hole with 15bbls lo-vis
pill/15bbls hi-vis pill. Wipe hole to 9000'. Got back 10% more
than normal drilling cuttings over the shakers.
05:45 - 07:30 1.75 DRILL P PROD1 RBIH. Orient TF to 147R & RIH clean thru window with pumps
off. RBIH to TO tagged @ 11343'. Correct CTD to 11350'. PIU
wt = 27k, S/O wt = 13k. Freespin = 1.5bpm/3500psi. PVT =
242bbls.
07:30 - 08:55 1.42 DRILL P PROD1 Drill to 11399' with HS TF, 1.65/1.45bpm, 3500/3900psi, 3k
WOB & 45fph ave ROP. PVT = 214bbls - Observe losses
bounce back from 0.1 to 0.3bpm losses.
08:55 - 09:00 0.08 DRILL P PROD1 Short wiper to 11300'.
09:00 - 09:15 0.25 DRILL P PROD1 Drill to 11410' with HS TF, 1.65/1.45bpm, 3500/3800psi, 5k
WOB & 45fph ave ROP. PVT = 209bbls. Should have 90degs
incl @ the bit now. Geo wants to keep coming up to 97degs.
09:15 - 10:20 1.08 DRILL P PROD1 Orient & drill to 11444' with HS TF, 1.65/1.40bpm,
3500/3800psi, 5k WOB & 45fph ave ROP. PVT = 189bbls.
10:20 - 10:30 0.17 DRILL P PROD1 Orient TF to 90R.
10:30 - 11 :20 0.83 DRILL P PROD1 Orient & drill to 11488' with 100R TF, 1.65/1.40bpm,
3500/3800psi, 3k WOB & 65fph ave ROP. See GR drop to
20api @ 10455' (zone-2?). PVT = 184bbls.
11 :20 - 11 :35 0.25 DRILL P PROD1 Drill to 11500' with 120R TF, 1.65/1.40bpm, 3500/3800psi, 3k
WOB & 60fph aye ROP. PVT = 181bbls. Pump up btms up
sample for Geo.
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/15/2004
Rig Release: 3/29/2004
Rig Number: N1
Spud Date: 9/15/1995
End: 3/29/2004
3/23/2004 11 :35 - 12:25 0.83 DRILL P PROD1 Wiper trip clean to window.
12:25 - 12:45 0.33 DRILL P PROD1 Tie in to RA PIP tag - 5' correction.
12:45 - 13:20 0.58 DRILL P PROD1 RBIH to btm.
13:20 - 16:25 3.08 DRILL P PROD1 Tag bottom. Orient. Drill ahead.
16:25 - 17:00 0.58 DRILL P PROD1 MWD battery died. Pump high vise. sweep. Displace well to
new flo pro mud.
17:00 - 18:30 1.50 DRILL N DFAL PROD1 New mud to bit. POOH displacing to new mud.
18:30 - 21:12 2.70 DRILL N DFAL PROD1 Change out MWD Package, PU new Motor and RR bit, Scribed
TF
21 :12 - 23:25 2.22 DRILL N DFAL PROD1 RIH, test tool at 800 ft. RIH to 10200 ft
23:25 - 23:52 0.45 DRILL N DFAL PROD1 Tiein at RA Marker at 10168 ft (+6 ft)
23:52 - 00:00 0.13 DRILL N DFAL PROD1 RIH to PTD 11600
3/24/2004 00:00 - 00:35 0.58 DRILL N DFAL PROD1 RIH
00:35 - 00:40 0.08 DRILL N DFAL PROD1 Worked thro fault area 11368 ft to 11600 ft Tagged bottom at
11600 ft.
00:40 - 01:19 0.65 DRILL N DFAL PROD1 PUH making MAD Pass up 11600 ft to 11414 ft
01 :19 - 01 :30 0.18 DRILL N DFAL PROD1 RI H to 11592 ft
01 :30 - 01 :45 0.25 DRILL P PROD1 Orient TF t095 to 100 R Vp = 277 bbl
01 :45 - 02:34 0.82 DRILL P PROD1 Drilling Orient TF. Drill at 160 TF. Vp 273 bbl, Q = 149/127
bpm, Drilling faulted area Vp = 257 bbl. Losing 19 bph
02:34 - 02:45 0.18 DRILL P PROD1 Orient TF to around to 80R
02:45 - 03:34 0.82 DRILL P PROD1 Drilling, Orient TF. Drill at 80R. Q = 1.47/1.24 bpm, Drilling
faluted area Vp = 257 bbl. Losing 19 bph Vp = 243 bbl
03:34 - 04:30 0.93 DRILL P PROD1 Orient TF to HS ROP at 50 to 70 fph, low Build rates Need to
obtain a TVD of 8892 ft
04:30 - 04:53 0.38 DRILL P PROD1 Drilling, Orient TF. Drill at HS TF. Q = 1.44/1.11 bpm, Vp =
224 bbl./216 bbl
04:53 - 07:20 2.45 DRILL P PROD1 Wiper trip to window after drilling 150 ft. RIH to 11,330'
07:20 - 09:00 1.67 DRILL P PROD1 Work through shale interval from 11,330' to 11,435'. Setting
down while reaming down. Reaming with HS TF as drilled.
12,000 Ib over pulls on pick up. Losing mud at 0.5 bpm. Ream
through bottom of shale interval and back ream to 11,300'.
09:00 - 09:40 0.67 DRILL P PROD1 Pit volume 200 bbls. IA=220 psi, OA=O. Drill at 1.56/1.06
3,700/3,940 psi, TF=9L, 60-80 fph ROP with 4,500 Ibs WOB.
09:40 - 09:45 0.08 DRILL P PROD1 Orient to 120R.
09:45 - 11 :00 1.25 DRILL P PROD1 Drill at 1.6/0.93 bpm 3,650/3,900 psi, TF=87R, 50-80 fph ROP.
11 :00 - 11 :30 0.50 DRILL N DPRB PROD1 Differentially stuck. Orient two clicks to confirm BHA is free.
Able to circulate at normal pressure. Work pipe a few times
with 60,000 Ibs PU. Shut down pump and slack off weight. Let
sit for 20 minutes. PU to 60,000 Ibs. Came free.
11 :30 - 12:30 1.00 DRILL P PROD1 Pull up hole and ream shale interval from 11,450' to 11,300' at
180 to 11 OL TF, pumping 1.58/1.02, 3,480psi. PU=28.5Klbs.
12:30 - 15:15 2.75 DRILL P PROD1 Drill ahead at 1.55/1.1 3,500/3,650 psi, TF=76R, ROP= 20-30
fph in shale.
15:15 - 16:05 0.83 DRILL P PROD1 Wiper trip to whistock
16:05 - 16:15 0.17 DRILL P PROD1 Monitor well. Static fluid test, no losses, well bore staying full
16:15 - 17:05 0.83 DRILL P PROD1 RIH
17:05 - 18:20 1.25 DRILL P PROD1 Drilling, having trouble getting WOB Work CT several times,
18:20 - 18:32 0.20 DRILL P PROD1 Wiper trip 200 ft. RIH and tag 11982 ft
18:32 - 19:02 0.50 DRILL P PROD1 Orient TF to 80 R,
i 19:02 - 20:45 1.72 DRILL P PROD1 Drilling short trip to get WOB, When on btm, drilling at 100 fph.
! Q = 1.39/0.86 bpm. TF @ 126R Resultant TVDss 8889 ft.
I
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
3/15/2004
3/29/2004
N1
Spud Date: 9/15/1995
End: 3/29/2004
3/24/2004 19:02 - 20:45 1.72 DRILL P PROD1 Drilling in the best sand sofar.
20:45 - 22:45 2.00 DRILL P PROD1 Wiper trip to top of window. While RIH tagged at 11448' Lower
Qp and RIH
22:45 - 22:50 0.08 DRILL P PROD1 Drilling @ 143 R, Drilling in good sand at 90 fph, Q = 1.41/0.91
(64% returns) Lossing 30 to 40 bph. WOB 7k
22:50 - 23:03 0.22 DRILL P PROD1 Orient TF 143 R to 90R
23:03 - 00:00 0.95 DRILL P PROD1 Drilling @ 90-149R, Drilling in good sand at 80-90 fph, Q =
1.41/1.06 (63% returns) Lossing 30 to 40 bph. WOB 7k
3/25/2004 00:00 - 00:25 0.42 DRILL P PROD1 Drilled @ 130RTF and into another fault @ 12080 ft Qp =
1.49/1.04 bpm
00:25 - 00:40 0.25 DRILL P PROD1 Orient TF around to 70R
00:40 - 01 :06 0.43 DRILL P PROD1 Drilling 64R TF, Q = 1.39/1.03 Hauling in New Flo-pro to make
up for losses Stacking and having trouble getting past 12,120 ft
Confirmed with Geologist, Called TO at 12120 ft 0100 hrs
3-25-04 Last Short Survey are showing 30deg DLS
01 :06 - 02:21 1.25 DRILL P PROD1 Wiper trip to TT to Tie-in
02:21 - 02:40 0.32 DRILL P PROD1 PUH Tie in at RA Marker. Corrected + 7 ft. 10177' to 10187 ft
02:40 - 03:43 1.05 DRILL P PROD1 RIH to confirm TO (Tagged at 12118 ft)
03:43 - 07:15 3.53 DRILL P PROD1 POOH to run liner.
07:15 - 07:30 0.25 DRILL P PROD1 PJSM for LD BHA.
07:30 - 08:05 0.58 DRILL P PROD1 LD BHA.
08:05 - 09:30 1.42 CASE P PROD1 RU to pump dart.
09:30 - 10:15 0.75 CASE P PROD1 Pump dart. Dart hit at 39.4 bbls.
10:15 - 10:30 0.25 CASE P PROD1 Stand injector back. RU to run liner.
10:30 - 10:45 0.25 CASE P PROD1 PJSM for running liner.
10:45 - 16:45 6.00 CASE P PROD1 Run 2 3/8", 4.7#, L-80, ST-L liner. Drift every connection after
makeup.
16:45 - 18:45 2.00 CASE P PROD1 RIH w/liner on CT. Check PU at 10,000', 35Klbs. Set down at
11,880'. PU and run through.
18:45 - 20:25 1.67 CASE P PROD1 Landed liner at 12118 ft Last 70 had to work down several
times, tubro hanging up. Cir at 0.58/0.31 bpm Wait on trucks
20:25 - 00:00 3.58 CASE N WAIT PROD1 Lost all returns while circulating, Q = 0.40 I O.Obbl. Vp = 243
bbl , round tripping mud truck while waiting on Mud swap.
Filling hole over the to~ every 30 minutes. Working liner
perdiically. Doyon 14 is using 16 trk on their Cement Job and
are called for midnight.
3/26/2004 00:00 - 06:00 6.00 CASE N WAIT PROD1 Waiting on trucks to conduct fluid swap. Qp = 0.5 I 0 bpm.
Filling well of the top, moving liner to enure free PU wt = 38k.
Cir would re-gain at times.At 0300 hrs partial circulation
returned and has been improving. At 0600 hrs, cir with 20 to
50 % retums
06:00 - 13:55 7.92 CASE N WAIT PROD1 Continue waiting on trucks. Circulate at .55/.45 bpm, 1575 psi.
Returns deminished to 0.2 bpm.
13:55 - 14:30 0.58 CASE P PROD1 One KCI truck on location and one loading at hot water plant.
Position reel to drop 5/8" aluminum ball to release from liner.
Pit volume 240 bbls. Lanch ball. Circulate ball down. Ball on
seat at 33 bbls. Pressure up to 3,400 psi and shear LBRT. PU
and confirm liner released, PU=27,OOO Ibs.
14:30 - 16:00 1.50 CASE N WAIT PROD1 Circulate at 0.55/0.18 bpm. Wait on KCI.
16:00 - 21:05 5.08 CASE P PROD1 Displace well bore to KCI at 1.58/0.3. Slow rate to 1.010.35
bpm to minimize fluid losses. KCI exited bit. Pump at 0.971.28
bpm. Cir and recovered clean 2%KCL with 68 bbl returned and
310 bbl
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/15/2004
Rig Release: 3/29/2004
Rig Number: N1
Spud Date: 9/15/1995
End: 3/29/2004
3/26/2004 21:05 - 21:19 0.23 CEMT P PROD1 PJSM on Liner Cement Job. 14 people on Location
21:19 - 21:40 0.35 CEMT P PROD1 Batch up 30 bbl cement/25 bbl pumpable and mix 20 bbl
Biozan pill. Cement at density @ 2135 hrs
21 :40 - 21 :47 0.12 CEMT P PROD1 SO pump, PT cement line to 4000 psi.
21:47 - 22:08 0.35 CEMT P PROD1 Pump 25 bbl cement Q = 1.44 bbl in 0.56 bbl out, at 3300 psi
22:08 - 23:00 0.87 CEMT P PROD1 Displace Cement w/20 1.5ppb Biozan, Pumped 19.4 bbl
2%KCL, Sheared LWP at 4400 psi. Pumped a total of 49.6 bbl,
dart landed at 2248 hrs. Released pressure, floats held
While displacing, lossing 50% returns. At 44 bbl into
displacement, lost 100% returns and only regained some cir
with 1.5 bblleft before plug bumped
Estimated 5 bbl (1532 ft) behine pipe.
23:00 - 00:00 1.00 CEMT P PROD1 Un-sting from deployment sleave, break cir, 100% returns.
POOH keeping hole full due to CT void age (3.9bbI/1000ft)
3/27/2004 00:00 - 00:15 0.25 CEMT P PROD1 POOH
00:15 - 01:00 0.75 CEMT P PROD1 LD BOT CTLRT
01 :00 - 05:00 4.00 BOPSU P COMP Weekly BOP Test Jeff Jones, AOGCC, granted extension and
wavered witnessing BOP Test
05:00 - 05:15 0.25 CLEAN P COMP PJSM on PU cleanout BHA
05:15 - 08:20 3.08 CLEAN P COMP PU BHA and TI H w/ 35 stands of 1" CSH from mast. PU 22
singles. Stab injector.
08:20 - 13:45 5.42 CLEAN P COMP RIH wI cleanout BHA. Tag landing collar at 12,069'
uncorrected. POOH. Paint EOP flags at 9,150' and 6,380'.
13:45 - 16:10 2.42 CLEAN P COMP Stand back 1" CSH. LD MHA, motor and mill.
16:10 -17:10 1.00 CLEAN P COMP RU to test liner lap.
17:10-17:45 0.58 CLEAN P COMP Test liner lap. Pressure up to 2,000 psi.
Time(min) PSI
0 2000
3 1956
6 1880
12 1860
14 1820
18 1791
22 1720
26 1700
30 1640
18% Pressure Loss
17:45 - 18:15 0.50 CLEAN P COMP Bleed off pressure. RD test equipment.
18:15 - 19:30 1.25 EVAL P COMP RU to run MCN / CCL /GR. PJSM on PU logging tools
19:30 - 21 :22 1.87 EVAL P COMP RI H with SBL MCNL ICCL I GR and 92 jts 1" CSH
21 :22 - 21 :45 0.38 EV AL P COMP MU Top BHA and stab injector head
21 :45 - 22:53 1.13 EVAL P COMP RIH to 9200 ft
22:53 - 00:00 1.12 EVAL P COMP Logging down at 30fph with MCNL
3/28/2004 00:00 - 00:35 0.58 EV AL P COMP RIH logging and tagged at 12074'
00:35 - 01 :26 0.85 EV AL P COMP PUH logging at 60 fpm and laying in 120kLSRV Flo_pro
01 :26 - 02:30 1.07 EVAL P COMP POOH wI MCNUCCUGR
02:30 - 04:00 1.50 EVAL P COMP Lay 1 jts down to come out on different break. Stand Back 1"
CSH in derrick
04:00 - 04:30 0.50 EV AL P COMP LD SLB logging tool
04:30 - 05:10 0.67 EVAL P COMP Download MCNL data and load pipe shed with perf guns.
Recovered Data from Memory Tools
Printed: 3/29/2004 8:47:21 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-39
E-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
3/15/2004
3/29/2004
N1
Spud Date: 9/15/1995
End: 3/29/2004
3/28/2004 05: 10 - 05:20 0.17 PERF P COMP PJSM on Perf Gun handling
05:20 - 06:00 0.67 PERF P COMP PU Perf 1.56" Guns
06:00 - 06:45 0.75 PERF P COMP PU Perf Guns. Receive MCNUCCUGR log data. Loggers
corrected PBTD at 12073.1 ft (Note: zero correction from liner
tally as run, ie. no affect for perforating depth control), Top of
Liner at 9326 ft.
06:45 - 08:15 1.50 PERF P COMP PJSM for running CSH. RIH wI 40 stands of CSH.
08:15 - 08:30 0.25 PERF P COMP MU injector.
08:30 - 10:30 2.00 PERF P COMP RIH. Tag PBTD at 12,069'. Correct depth to 12,073.1 '. PU to
12,040.7' to place guns on depth.
10:30 - 11 :15 0.75 PERF P COMP Launch 1/2" aluminum ball. Circulate ball down. Ball on seat
at 38.1 bbls pumped.
11 : 15 - 11 :20 0.08 PERF P COMP RIH to 12,047'. Pull up hole at 7 fpm. Pressure up on firing
head and fire guns. Perforate w/1.56", 6SPF 1606PJ guns.
Perforated intervals
11 ,630' - 11,805'
11,890' - 12,040'.
11 :20 - 13:15 1.92 PERF P COMP POOH circulating down coil. Hole taking proper fill. Stop at
10,500'. Monitor well, no flow. POOH to top of liner. No flow.
Fill hole down kill line, holding 100 psi on the choke. POOH.
13:15 - 13:20 0.08 PERF P COMP Flow check, no flow.
13:20 - 13:30 0.17 PERF P COMP Unstab injector.
13:30 - 15:00 1.50 PERF P COMP Rack back CSH.
15:00 - 15:15 0.25 PERF P COMP PJSM for LD perf guns.
15:15 - 16:45 1.50 PERF P COMP LD perf guns. Off load guns
16:45 - 17:00 0.25 CASE P COMP PJSM for PU liner top packer.
17:00 - 17:15 0.25 CASE P COMP PU liner top packer assembly.
17:15 - 17:30 0.25 CASE P COMP MU injector.
17:30 - 17:55 0.42 CASE P COMP RIH. Tagged 2.75" SSSV profile nipple at 2187 ft, PU unable to
pass. Contact BOT and WFT on avialablity of L TP < 2.75" 10
17:55 - 18:15 0.33 CASE P COMP POOH and LD BOT L TP and seal assembly
18:15 - 20:24 2.15 CASE P COMP PU nozzle and RIH to FP welbore and CT
20:24 - 22:10 1.77 CASE P COMP PUH laying in MEOH 50% from 2000 ft to 500 ft, 100% to
surface
22:10 - 00:00 1.83 RIGD P POST Blowed CT back 6 bbl and cleaning pits
NO BOP'sRig
PT tree cap to 4000 psi
Released at 00:00 hrs 3-29-2004
3/29/2004 00:00 - 0.00 RIGD POST RD rig and make ready to scope derrick down
Printed: 3/29/2004 8:47:21 AM
e
e
17 -Apr -04
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE .£ - "1 9 r-\-
Re: Distribution of Survey Data for Well ~
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
10,139.30' MD
10,185.00' MD
12,118.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date ¡;( ~ Ar;l6t vL
Signed
'u oiL;
.
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
r¡ à ~(- Û LJ( (j
Attachment(s)
Halliburton Sperry-Sun
North Slope Alaska
BPXA
PBU WOA E Pad
E-39A
Job No. AKMW2976242, Surveyed: 25 March, 2004
Survey Report
16 April, 2004
Your Ref: API 500292258701
Surface Coordinates: 5975142.24 N, 664488.60 E (70020'18.1990" N, 148039' 54.8651" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 975142.24 N, 164488.60 E (Grid)
Surface Coordinates relative to Structure Reference: 1936.97 N, 1992.60 E (True)
Kelly Bushing Elevation: 65. 60ft above Mean Sea Level
Kelly Bushing Elevation: 65. 60ft above Project V Reference
Kelly Bushing Elevation: 65. 60ft above Structure Reference
SpE!·I"""'I"""'Y-SUI"1
QRtL.L..ING SeRVICeS
A Halliburton Company
DEFINITIVE
e
e
Survey Ref: svy4255
Halliburton Sperry-Sun
Survey Report for PBU_WOA E Pad - E-39A
Your Ref: API 500292258701
Job No. AKMW2976242, Surveyed: 25 March, 2004
BPXA
North Slope Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
10139.30 81.940 63.430 8838.28 8903.88 2736.19 S 28.69 E 5972407.34 N 664577.31 E 827.42 Tie On Point
10161.00 84.110 62.390 8840.91 8906.51 2726.38 S 47.87 E 5972417.56 N 664596.26 E 11 .074 842.89 Window Point
10188.90 76.290 61.170 8845.66 8911.26 2713.40 S 72.07 E 5972431.08 N 664620.18 E 28.357 862.25
10219.68 69.350 59.790 8854.74 8920.34 2698.92 S 97.65 E 5972446.11 N 664645.43 E 22.950 882.47
10242.39 76.570 58.750 8861.39 8926.99 2687.83 S 116.30 E 5972457.61 N 664663.83 E 32.092 897.06 e
10273.44 82.270 55.430 8867.09 8932.69 2671.25 S 141.91 E 5972474.75 N 664689.07 E 21.151 916.70
10303.76 85.870 56.310 8870.22 8935.82 2654.33 S 166.86 E 5972492.21 N 664713.65 E 12.219 935.63
10334.94 88.940 61.930 8871.64 8937.24 2638.36 S 193.58 E 5972508.77 N 664740.01 E 20.520 956.51
10367.05 91.230 69.310 8871.59 8937.19 2625.11 S 222.81 E 5972522.65 N 664768.94 E 24.063 980.58
10397.97 89.470 72.300 8871.40 8937.00 2614.95 S 252.00 E 5972533.45 N 664797.91 E 11.221 1005.53
10428.47 89.300 75.290 8871.73 8937.33 2606.44 S 281.29 E 5972542.60 N 664827.00 E 9.819 1031.05
10459.48 91.670 81.270 8871.47 8937.07 2600.14 S 311.63 E 5972549.56 N 664857.20 E 20.741 1058.23
10489.66 92.640 82.320 8870.33 8935.93 2595.84 S 341.48 E 5972554.52 N 664886.94 E 4.735 1085.51
10520.43 92.460 90.930 8868.96 8934.56 2594.03 S 372.14 E 5972557.00 N 664917.55 E 27.960 1114.30
10551.74 90.790 93.400 8868.07 8933.67 2595.21 S 403.41 E 5972556.50 N 664948.84 E 9.520 1144.55
10582.55 91.850 98.670 8867.36 8932.96 2598.45 S 434.03 E 5972553.94 N 664979.53 E 17.443 1174.78
10612.13 94.660 100.250 8865.68 8931.28 2603.30 S 463.16 E 5972549.73 N 665008.75 E 10.894 1204.05
10644.44 95.180 96.030 8862.91 8928.51 2607.86 S 495.02 E 5972545.87 N 665040.71 E 13.112 1235.85
10675.92 95.620 90.580 8859.94 8925.54 2609.67 S 526.29 E 5972544.75 N 665072.01 E 17.292 1266.29
10708.26 95.620 88.470 8856.78 8922.38 2609.40 S 558.48 E 5972545.72 N 665104.18 E 6.493 1296.99
10742.07 92.720 83.380 8854.32 8919.92 2607.00 S 592.10 E 5972548.86 N 665137.74 E 17.291 1328.44
10775.77 91.050 78.810 8853.21 8918.81 2601.79 S 625.36 E 5972554.80 N 665170.89 E 14.431 1358.73 e
10807.50 93.600 80.910 8851.92 8917.52 2596.21 S 656.57 E 5972561.06 N 665201.96 E 10.407 1386.93
10838.66 93.690 85.130 8849.94 8915.54 2592.43 S 687.43 E 5972565.52 N 665232.73 E 13.519 1415.34
10869.55 92.200 88.300 8848.35 8913.95 2590.66 S 718.22 E 5972567.96 N 665263.48 E 11.327 1444.27
10901.99 95.270 92.690 8846.24 8911.84 2590.94 S 750.58 E 5972568.39 N 665295.83 E 16.489 1475.30
10934.79 94.310 96.380 8843.50 8909.10 2593.52 S 783.15 E 5972566.52 N 665328.46 E 11.586 1507.21
10967.75 93.510 99.200 8841.25 8906.85 2597.98 S 815.73 E 5972562.78 N 665361.12 E 8.874 1539.66
11012.43 89.910 93.570 8839.92 8905.52 2602.94 S 860.09 E 5972558.79 N 665405.58 E 14.950 1583.53
11047.17 89.820 91.290 8840.00 8905.60 2604.41 S 894.80 E 5972558.08 N 665440.31 E 6.568 1617.15
11080.40 86.570 90.580 8841.04 8906.64 2604.96 S 928.00 E 5972558.27 N 665473.52 E 10.011 1649.07
11113.64 85.780 89.700 8843.26 8908.86 2605.04 S 961.16E 5972558.91 N 665506.68 E 3.553 1680.81
11144.70 86.750 96.210 8845.29 8910.89 2606.64 S 992.10 E 5972557.99 N 665537.64 E 21.146 1710.86
11173.99 87.360 96.560 8846.79 8912.39 2609.89 S 1021.17 E 5972555.38 N 665566.78 E 2.400 1739.61
11203.63 89.380 102.180 8847.64 8913.24 2614.71 S 1050.39 E 5972551.20 N 665596.09 E 20.140 1768.96
16 April, 2004 - 15:04
Page 2 of 4
Dri/lQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for PBU_WOA E Pad - E-39A
Your Ref: API 500292258701
Job No. AKMW2976242, Surveyed: 25 March, 2004
BPXA
North Slope Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11237.09 85.690 100.950 8849.07 8914.67 2621.41 S 1083.13 E 5972545.22 N 665628.98 E 11.623 1802.23
11266.38 80.240 103.240 8852.66 8918.26 2627.50 S 1111.55 E 5972539.76 N 665657.52 E 20.159 1831.18
11300.27 76.730 105.880 8859.43 8925.03 2635.84 S 1143.68 E 5972532.12 N 665689.83 E 12.865 1864.35
11334.86 79.010 110.090 8866.70 8932.30 2646.28 S 1175.83E 5972522.39 N 665722.20 E 13.602 1898.15
11364.85 82.880 110.450 8871.42 8937.02 2656.54 S 1203.61 E 5972512.74 N 665750.20 E 12.959 1927.72 e
11394.59 87.360 110.800 8873.95 8939.55 2666.98 S 1231.34E 5972502.92 N 665778.14 E 15.109 1957.28
11426.85 93.160 111.330 8873.80 8939.40 2678.57 S 1261.43 E 5972491.99 N 665808.48 E 18.054 1989.45
11458.27 96.590 114.140 8871.13 8936.73 2690.66 S 1290.29 E 5972480.53 N 665837.61 E 14.091 2020.59
11491.56 97.650 120.470 8867.00 8932.60 2705.80 S 1319.63E 5972466.04 N 665867.27 E 19.134 2053.07
11523.62 93.870 122.220 8863.78 8929.38 2722.39 S 1346.87 E 5972450.05 N 665894.86 E 12.981 2083.97
11555.93 89.300 125.560 8862.89 8928.49 2740.40 S 1373.67 E 5972432.64 N 665922.05 E 17.515 2114.86
11590.79 84.200 125.390 8864.86 8930.46 2760.59 S 1402.00 E 5972413.07 N 665950.82 E 14.638 2147.86
11622.13 80.510 127.850 8869.03 8934.63 2779.11 S 1426.93 E 5972395.1 0 N 665976.15 E 14.111 2177.11
11656.50 78.220 129.780 8875.38 8940.98 2800.28 S 1453.24 E 5972374.51 N 666002.92 E 8.651 2208.47
11691.08 78.400 135.230 8882.39 8947.99 2823.15 S 1478.20 E 5972352.20 N 666028.37 E 15.442 2239.02
11722.43 81.210 140.680 8887.94 8953.54 2846.06 S 1498.85 E 5972329.75 N 666049.52 E 19.314 2265.46
11755.44 85.340 136.640 8891.81 8957.41 2870.66 S 1520.50 E 5972305.63 N 666071.70 E 17.441 2293.36
11786.53 89.210 137.690 8893.28 8958.88 2893.42 S 1541.61 E 5972283.33 N 666093.31 E 12.897 2320.20
11818.79 90.530 142.090 8893.36 8958.96 2918.09 S 1562.38 E 5972259.12 N 666114.62 E 14.239 2347.28
11849.72 92.810 145.080 8892.46 8958.06 2942.97 S 1580.73 E 5972234.66 N 666133.51 E 12.153 2372.10
11880.26 94.480 150.350 8890.51 8956.11 2968.72 S 1597.01 E 5972209.27 N 666150.35 E 18.068 2395.20
11916.23 95.360 152.630 8887.43 8953.03 3000.21 S 1614.11 E 5972178.16 N 666168.14 E 6.773 2420.76 e
11951.64 93.870 158.790 8884.58 8950.18 3032.37 S 1628.62 E 5972146.33 N 666183.35 E 17.843 2444.04
11983.92 91.760 163.360 8882.99 8948.59 3062.85 S 1639.07 E 5972116.08 N 666194.47 E 15.577 2462.95
12017.92 91.930 170.210 8881.89 8947.49 3095.92 S 1646.84 E 5972083.19 N 666202.96 E 20.143 2480.04
12053.90 89.380 168.980 8881.48 8947.08 3131.30S 1653.34 E 5972047.96 N 666210.23 E 7.868 2496.60
12086.42 90.090 177.240 8881.63 8947.23 3163.56 S 1657.23 E 5972015.80 N 666214.83 E 25.493 2509.75
12107.07 87.010 170.560 8882.16 8947.76 3184.07 S 1659.42 E 5971995.34 N 666217.47 E 35.609 2517.85
12118.00 87.010 170.560 8882.73 8948.33 3194.84 S 1661.21 E 5971984.61 N 666219.50 E 0.000 2522.71 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 107.000° (True).
16 April, 2004 -15:04 Page 3 of 4 Dri/lQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for PBU_WOA E Pad - E-39A
Your Ref: API 500292258701
Job No. AKMW2976242, Surveyed: 25 March, 2004
North Slope Alaska
BPXA
Based upon Minimum Curvature type calculations, at a Measured Depth of 12118.00ft.,
The Bottom Hole Displacement is 3600.92ft., in the Direction of 152.527° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
e
10139.30
10161.00
12118.00
8903.88
8906.51
8948.33
2736.19 S
2726.38 S
3194.84 S
28.69 E
47.87 E
1661.21 E
Tie On Point
Window Point
Projected Survey
Survey tool prof/ram for E-39A
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
0.00 12118.00
8948.33 MWD Magnetic (E-39)
e
16 April, 2004 - 15:04
Page 4 of4
DrillQuest 3.03.06.002
TREE = 4-1/16" 5MClW
WELLHEA D = 9-518" 5M FrvK::
ACTUATOR = BA KER
. ELBI = 66.05'
9-518" CSG, 47#, NT-80,ID = 8.661" I
3-1/2" HES SSSV LAND NIp, 10 =
ÆRFORA TON SUMIlAARY
REF LOG: SÆRRY SUN MWO ON 09/23/95
A NGLE AT TOP PERF: 69 @ 9940'
Note: Refer to Production DB for historical perf data
SIZE SPF INTffiV AL [)II. TE
2-1/4" 6 9940 - 9955
2-1/2" 6 10020 - 10040
2-1/2" 4 10090-10110
2-3/4" 4 10110- 10150
2-314" 4 10170 - 10330
2-3/4" 4 10400 10590
2-314" 4 10640 - 10820
4-1/2" LNR, 12.6#, L-80, aTC, 0.0152 bpf, D =3.953" 1-/10932' I
G ON STA #1-2
COMM8\JTS
track
FRUDHOE SAY UNIT
WRL: E-39
PERMIT No: 1I'.j951260
A PI No: 50-029-22587-01
SEe 6, T11 N, R14E, 1921,74' FNL & 501'
BP Exploration (Alaska)
.
.
AI1ASKA. OIL AlÐ) GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Mary Endacott
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe E-39A
BP Exploration (Alaska) Inc.
Permit No: 204-040
Surface Location: 3358' NSL, 501' WEL, SEC. 06, TIIN, RI4E, UM
Bottomhole Location: 169' NSL, 1241' EWL, SEe. 05, TIIN, RI4E, UM
Dear Ms. Endacott:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you ITom obtaining additional permits or approvals
required by law ITom other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field ins ector 6 -3607 (pager).
S' c r
BY ORDER 9F THE COMMISSION
DATED this.:L day of March, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
o Drill Ia Redrill
1a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3358' NSL, 501' WEL, SEC. 06, T11 N, R14E, UM
Top of Productive Horizon:
35T NSL, 988' WEL, SEC. 06, T11 N, R14E, UM
Total Depth:
169' NSL, 1241' EWL, SEC. 05, T11N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: X-664489 y-5975142 Zone-ASP4
16. Deviated Wells:
Kickoff Depth
18. Casing Program
Size
Casino
2-3/8"
\¡.j{:¡A- '5 J 1l2CC' i(
ALA.A OIL AND ~~ST~g~S~L:;:~O~OMMISSIO~'¡. tVE
PERMIT TO DRILL FEB 262004
20 AAC 25.005 /
~~~~~:~1~;'~cß,"~~~I~~~~=ê;~"
11. Well Name and Number:
PBU E-39A /
12. Field 1 Pool(s):
Prudhoe Bay Field 1 Prudhoe Bay
Pool
1b. Current Well Class 0 Exploratory
o Stratigraphic Test 0 Service
5. Bond: IS! Blanket 0 Single Well
Bond No. 2S100302630-277
6. Proposed Depth:
MD 12140 TVD 8896ss
7. Property Designation:
ADL 028304
8. Land Use Permit:
13. Approximate Spud Date:
March 18, 2004
14. Distance to Nearest Property:
9120'
9. Acres in Property:
2560
3"
Weioht
4.6#
Specifications
Grade Couolina Lenath
L-80 STL 2815'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 66' feet E-20 is 471' away at 1192T MD
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
910 Downhole: 3250 psig Surface: 2194 psig ~.
Setting Depth Quantity of Cement
Top . Bottom lc.f. or sacks)
MD TVD MD TVD 7includino staqe data)
9325' 8361' 12140' 8896' 86 sx Class 'G' ./
10200 ft Maximum Hole Angle
Hole
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): I Effective Depth TVD (ft):1
10931 8945 9335 10842 I 8942 I
Casing Length Size Cement Volume MD
Structural
Conductor
Surf8c:e
Intermediate
Production
liner
Junk (measured):
None
TVD
7"
260 sx Arcticset (Approx.)
1020 sx CS 111,306 sx 'G', 225 sx CS II
96 sx Class 'G'
10T
3639'
10066'
10T
3624'
8892'
10T
3604'
10033'
20"
9-5/8"
936'
4-1/2"
140 sx Class 'G'
9995' - 10931'
887T - 8945'
20. Attachments IS! Filing Fee IS! BOP Sketch
o Property Plat 0 Diverter Sketch
I Perforation Depth TVD (ft): 8861' - 8940'
IS! Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report IS! Drilling Fluid Program IS! 20 AAC 25.050 Requirements
Perforation Depth MD (ft): 9940' - 10820'
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mary Endacott, 564-4388
Printed Name Mary Endacott Title CT Drilling Engineer
r::zJ ' ,/ Prepared By Name/NLlmber:
Sionature ---l J" ¿VìJ.A ~tdtl.6e-fl--· Phone 564-4388 Date z.!Zt¡¿ / 04 Terrie Hubble, 564-4628
I iJ Commission Use Only J T ¡
Permit To Drill . , I API Number: I Permit Appro~ If7 {¡fll/see cover letter for
Number:..20 <7~ c> 7-'aI50-029-22587-01-00 Date: 'I'JtX If-! otherrequirements
Conditions of Approval: Samples Required [] Yes IX] No Mud Log Requir~cf' I ( !I Yes lX1 No
Hydroge u fide Measures 1><:1 Yes No Directional Survh Required !'XJ Yes No
Other: Te s 1- E
G
500 p~/,
Aooroved Bv:7
Form 10-401 ~ed \2Jl()03 ~
~rt
---
BY ORDER OF
THE COMMISSION
3, rþ Jr/
1ubm/ln DJplicate
Date
0010 r\
f
.
.
BP
E-39A CTD Sidetrack
Phase 1 Operations: Prep work
· Integrity test annuli, wellhead seals & Xmas tree valves
· Set a whipstock and downsqueeze cement.
Phase 2 Operations: Mill window, Drill and Complete sidetrack: Planned for March 18th, 2004.
Mud Program:
· Phase 1: Seawater/1 % KCI / Y2 Ib biozan ,
· Phase 2: Mill with seawater / Y2lb biozan, drill with Solids Free Flo-Pro (8.5- 8.7 ppg)/
Disposal:
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
· 2%" 9325' (-8360sstvd) to 12,1~sstvd)
· The liner will be cemented With~ with a planned TOC of 9800' within the 7" liner.
Parent Well Casings OH size Burst (psi) Collapse (psi)
9%" 47#, NT-80, - Surface CSG 6870 4760
7" 26#, L-80 -Intermediate Csg 7240 5410
4112" 12.6# L-80 Production Liner 8430 7500
Sidetrack CasinQs
23/8" 4.6#, L-80, STL - Prod LNR 3" 11200 11780
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. /
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 90 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
· E-39A will be 471' away from well E-20 at 11,927'
· E-39A is -9,120' from the change of ownership boundary, (Prudhoe Bay Unit)
Logging
· MWD Gamma Ray will be run in the open hole section.
· Memory CNL will be run inside the liner.
Hazards
· No evidence of significant H2S in the area.
· One fault will be cut by the wellpath. The risk of a lost circulation event is considered moderate.
Reservoir Pressure
· Res. press. is estimated to be 3250 psi at 8800'ss (7.1 ppg emw).
· Max. surface pressure with gas (0.12 psi/ft) to surface is 2194psi. /
TREE = 4-1/16" 5MCW
W8..LHEAD = 9-5/8" 5M FtvC
ACTUA TOR = BAKER
KB. ELEV = 66.05'
BF ELEV - 30.50'
KOP = 3397'
Max Ange - 92 @ 10427'
Datum MD = 9956'
Datum TVD = 8800' SS
9-5/8" CSG, 47#, NT-80, ID = 8.681"
Minimum ID = 2.75" @ 2187'
3-1/2" SSV LANDING NIPPLE
3-112" lBG, 9.2#, L-80, .0087 bpf, ID - 2.992"
9347'
TOP OF 4-112" LNR
7" CSG, 26#, L-BO, ID = 6.276"
PERFORATION SUMMARY
REF LOG: SPERRY SLN rvtND ON 09/23/95
ANGLEA TTOP ÆRF: 69 @ 9940'
J\bte: Refer to A"oductbn œ for historical perf data
SIZE SPF INTERVAL OpnlSqz DA TE
2-1/4" 6 9940 - 9955 0 02115103
2-112" 6 10020-10040 0 11/21/96
2-112" 4 10090-10110 0 09/12/96
2-3/4" 4 10110 - 10150 0 09112/96
2-3/4" 4 10170 - 10330 0 10/07195
2-3/4" 4 10400 - 10590 0 10/07195
2-3/4" 4 10640 - 10820 0 10/07/95
DATE
10/07/95
09/06101
02115/03
07/15/03
09/02103
10/04103
REV BY COMrvENTS
ORlG HORIZ COM PLETION
RNITP CORRECìlONS
RlVEitlh MFERFS
RlVEiKK GLV 00; SEf TTP
DTRiKK GLV 00
DACITLP EXTENDED A<G ON STA #1-2
DATE
E-39 /
SAFETY NOTES: HORIZONTAL WELL
.
218T -13-1/2" HES SSSV LAND NIP, ID= 2.75" I
GAS LIFT MANDRELS
ST rvo TVD DEV 1Y PE VL V LA TŒi PORf
2 4257 4131 28 CAM **DMY RK 0
1 7466 6743 36 CAM **DMY RK 0
DATE
09/02103
09/02103
** STA # 1 & 2 - DMY VLV H6.S EXTENDED PACKING
9279'
3-1/2" HES X NIP, ID = 2.75'
9291'
7" X 3-112" BKR S3 PKR. ID = 3.875"
9316'
X PLUG (07/15/03)
3-1/2" WLEG, ID- 2.75"
-i ELMDTT LOGGED 03/31/96
4-1/2" LNR,12.6#,L-80, .0152bpf,ID= 3.953"
REV BY
PRUŒlOE BAY UNIT
W8..L: E-39
ÆRMT J\b: 1951260
API J\b: 50-029-22587-00
SEC 6, T11N, R14E, 1921.74' Ft'J.. & 501' ÆL
co fvTv1ENTS
BP Exploration (Alaska)
TREE = 4-1/16"5MCIW
WELLHEAD = 9-5/8" 5M FMC
ACTUATOR = BAKER
KB. ELEV = 66.05'
BF. ELEV = 30.50'
KOP = 3397'
Max Angle = 92 @ 10427'
Datum MD '" 9956'
Datum ND = 8800' SS
.
Proposed CTD Sidetrack
2187'
-j 3-1/2" HES SSSV LAND NIP, ID = 2.75" I
.
9-5/8" CSG, 47#, NT-80, ID = 8.681" I
TOPOF 4-1/2" LNR I
GAS LIFT MANDRELS
ST MD NO DEV TYÆ VLV LATCH PORT
2 4257 4131 28 CAM **DMY RK 0
1 7466 6743 36 CAM **DMY RK 0
DATE
09/02/03
09/02/03
Minimum ID = 2.75" @ 2187'
3-1/2" SSV LANDING NIPPLE
** STA # 1 & 2 = DMY VLV HAS EXTENDED PACKING
Top of 2-3/8" liner I
9325'
9279' -j 3-1/2" HES X NIP, 10 = 2.75" I
9291' -j 7" X 3-1/2" BKR S3 PKR, 10 = 3.875" I
9316' -j3-1/2" HES X NIP, 10 = 2.75" I
9335' -j 3-1/2" HES X NIP, 10 = 2.75" I
3-1/2" WLEG, ID = 2.75"
ELMD IT LOGGED 03/31/96
3-1/2' TBG, 9.2#, L-80, .0087 bpf, 10 = 2.992"
TOP of Cement
7" CSG, 26#, L-80, 10 = 6.276" I
ÆRFORA TION SUMMARY
REF LOG: SPERRY SUN MWD ON 09/23/95
ANGLEATTOPÆRF: 69 @ 9940'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DA TE
2-1/4" 6 9940 - 9955 isolated proposed
2-1/2" 6 10020 - 10040 isolated proposed
2-1/2" 4 10090-10110 isolated proposed
2-3/4" 4 10110 - 10150 isolated proposed
2-3/4" 4 10170 - 10330 isolated proposed
2-3/4" 4 10400 - 10590 isolated proposed
2-3/4" 4 10640 - 10820 isolated proposed
/
Mechanical Whipstock I
PBTD -j 10842' I
4-1/2" LNR, 12.6#, L-80, .0152 bpf, 10 = 3.953" I
10932'
.
Baker Hughes Incorporated
BHI Planning Report
.
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System: US State Plane Coordinate System 1927
GeoDatum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: PB E Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973160.88 ft
662538.97 ft
Latitude: 70 19
Longitude: 148 40
North Reference:
Grid Convergence:
Alaska, Zone 4
Well Centre
bggm2003
59.134 N
53.054 W
True
1.24 deg
Well: E-39 Slot Name: 39
E-39
Well Position: +N/-S 1939.09 ft Northing: 5975142.56 ft Latitude: 70 20 18.202 N
+E/-W 1992.40 ft Easting : 664488.74 ft Longitude: 148 39 54.861 W
Position Uncertainty: 0.00 ft
Wellpath: Plan #5 E-39A
500292258701
Current Datum: 62: 395/31/199611:23
Magnetic Data: 1/12/2004
Field Strength: 57585 nT
Vertical Section: Depth From (TVD)
ft
35.60
Height 65.60 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
+N/-S
ft
0.00
Plan: Plan #5
Date Composed:
Version:
Tied-to:
Principal: Yes
Targets
E-39
10107.88 ft
Mean Sea Level
25.43 deg
80.88 deg
Direction
deg
107.00
1/12/2004
4
From: Definitive Path
E-39A Polygon 65.60 -2622.58 -36.28 5972520.00 664510.00 70 19 52.409 N 148 39 55.920 W
-Polygon 1 65.60 -2622.58 -36.28 5972520.00 664510.00 70 19 52.409 N 148 39 55.920 W
-Polygon 2 65.60 -2424.41 278.16 5972725.00 664820.00 70 19 54.358 N 148 39 46.739 W
-Polygon 3 65.60 -2530.24 1226.13 5972640.00 665770.00 70 19 53.316 N 148 39 19.060 W
-Polygon 4 65.60 -2721.57 1512.03 5972455.00 666060.00 70 19 51.434 N 148 39 10.714 W
-Polygon 5 65.60 -3212.96 1796.34 5971970.00 666355.00 70 19 46.601 N 148 39 2.417 W
-Polygon 6 65.60 -3268.96 1750.09 5971913.00 666310.00 70 19 46.050 N 148 39 3.767 W
-Polygon 7 65.60 -3095.85 1473.80 5972080.00 666030.00 70 19 47.753 N 148 39 11.832 W
-Polygon 8 65.60 -2817.27 1314.87 5972355.00 665865.00 70 19 50.493 N 148 39 16.471 W
-Polygon 9 65.60 -2770.09 1215.87 5972400.00 665765.00 70 19 50.958 N 148 39 19.361 W
-Polygon 10 65.60 -2645.58 328.33 5972505.00 664875.00 70 19 52.183 N 148 39 45.274 W
-Polygon 11 65.60 -2672.83 202.69 5972475.00 664750.00 70 19 51.915 N 148 39 48.943 W
-Polygon 12 65.60 -2759.09 30.74 5972385.00 664580.00 70 19 51.067 N 148 39 53.963 W
E-39A Fault #1 65.60 -2310.51 785.82 5972850.00 665325.00 70 19 55.478 N 148 39 31.916 W
-Polygon 1 65.60 -2310.51 785.82 5972850.00 665325.00 70 19 55.478 N 148 39 31.916 W
-Polygon 2 65.60 -2615.29 999.20 5972550.00 665545.00 70 19 52.480 N 148 39 25.687 W
-Polygon 3 65.60 -3006.47 1275.70 5972165.00 665830.00 70 19 48.633 N 148 39 17.615 W
E-39A Fault #3 65.60 -2790.23 310.15 5972360.00 664860.00 70 19 50.760 N 148 39 45.805 W
-Polygon 1 65.60 -2790.23 310.15 5972360.00 664860.00 70 19 50.760 N 148 39 45.805 W
-Polygon 2 65.60 -2902.76 1107.93 5972265.00 665660.00 70 19 49.653 N 148 39 22.513 W
E-39A Fault #4 65.60 -2113.51 925.18 5973050.00 665460.00 70 19 57.415 N 148 39 27.846 W
-Polygon 1 65.60 -2113.51 925.18 5973050.00 665460.00 70 19 57.415 N 148 39 27.846 W
-Polygon 2 65.60 -3004.73 2336.07 5972190.00 666890.00 70 19 48.647 N 148 38 46.657 W
E-39A Fault #2 65.60 -2147.44 -35.86 5972995.00 664500.00 70 19 57.082 N 148 39 55.908 W
.
.
Baker Hughes Incorporated
BHI Planning Report
-Polygon 1 65.60 -2147.44 -35.86 5972995.00 664500.00 70 19 57.082 N 148 39 55.908 W
-Polygon 2 65.60 -2320.07 765.60 5972840.00 665305.00 70 19 55.384 N 148 39 32.506 W
E-39A Fault #5 65.60 -3119.70 1193.19 5972050.00 665750.00 70 19 47.519 N 148 39 20.025 W
-Polygon 1 65.60 -3119.70 1193.19 5972050.00 665750.00 70 19 47.519 N 148 39 20.025 W
-Polygon 2 65.60 -3380.85 1697.62 5971800.00 666260.00 70 19 44.950 N 148 39 5.300 W
E-39A Fault #6 65.60 -3356.23 1943.24 5971830.00 666505.00 70 19 45.191 N 148 38 58.129 W
-Polygon 1 65.60 -3356.23 1943.24 5971830.00 666505.00 70 19 45.191 N 148 38 58.129 W
-Polygon 2 65.60 -3451.91 2201.22 5971740.00 666765.00 70 19 44.250 N 148 38 50.598 W
E-39A T5.2 8932.60 -2633.43 1042.66 5972532.82 665588.85 70 19 52.302 N 148 39 24.418 W
E-39A T5.1 8940.60 -2652.42 184.13 5972495.00 664731.00 70 1952.116 N 148 39 49.485 W
E-39A T5.3 8962.60 -2684.73 1206.52 5972485.13 665753.78 70 19 51.797 N 148 39 19.634 W
E-39A T5.4 8962.60 -3204.03 1739.13 5971977.67 666297.62 70 19 46.689 N 148 39 4.086 W
Annotation
10107.88 8899.32 TIP
10200.00 8909.82 KOP
10262.00 8924.20 3
10349.64 8939.71 4
10700.00 8935.80 5
10900.00 8934.04 6
11150.00 8932.06 7
11190.00 8931.78 8
11286.57 8946.98 9
11379.94 8962.00 10
11790.00 8962.00 11
12139.00 8962.00 TO
Plan Section Information
10107.88 81.40 62.03 8899.32 -275Q.43 1.07 0.00 0.00 0.00 0.00
10139.30 81.94 63.43 8903.88 -2736.19 28.70 4.73 1.72 4.46 68.81
10171.65 85.18 61.89 8907.50 -2721.43 57.25 11.08 10.02 -4.76 334.63
10180.00 86.09 61.54 8908.14 -2717.48 64.59 11.67 10.90 -4.19 339.00
10200.00 84.29 61.54 8909.82 -2707.99 82.11 9.00 -9.00 0.00 180.00
10262.00 68.79 61.54 8924.20 -2679.34 134.95 25.00 -25.00 0.00 180.00
10349.64 90.70 61.54 8939.71 -2638.49 210.31 25.00 25.00 0.00 0.00
10700.00 90.52 103.59 8935.80 -2594.16 549.96 12.00 -0.05 12.00 90.00
10900.00 90.47 79.58 8934.04 -2599.65 748.42 12.00 -0.02 -12.00 270.00
11150.00 90.41 109.59 8932.06 -2619.40 994.77 12.00 -0.03 12.00 90.00
11190.00 90.41 104.79 8931.78 -2631.22 1032.97 12.00 0.00 -12.00 270.00
11286.57 71.40 108.26 8946.98 -2658.13 1123.98 20.00 -19.69 3.60 170.00
11379.94 90.00 106.60 8962.00 -2685.58 1211.51 20.00 19.92 -1.78 354.81
11790.00 90.00 155.81 8962.00 -2947.47 1510.64 12.00 0.00 12.00 90.00
12140.00 90.00 113.81 8962.00 -3188.64 1753.44 12.00 0.00 -12.00 270.00
·
e
Baker Hughes Incorporated
BHI Planning Report
10107.88 81.40 62.03 8833.72 -2750.43 1.07 5972393.00 664550.15 0.00 805.17 0.00 TIP
10139.30 81.94 63.43 8838.28 -2736.19 28.70 5972407.84 664577.46 4.73 827.44 68.81 MWD
10150.00 83.01 62.92 8839.68 -2731.40 38.17 5972412.84 664586.82 11.08 835.09 334.63 MWD
10171.65 85.18 61.89 8841.90 -2721.43 57.25 5972423.23 664605.67 11.08 850.42 334.69 MWD
10175.00 85.55 61.75 8842.17 -2719.85 60.20 5972424.87 664608.58 11.67 852.77 339.00 MWD
10180.00 86.09 61.54 8842.54 -2717.48 64.59 5972427.33 664612.92 11.67 856.28 339.02 MWD
10200.00 84.29 61.54 8844.22 -2707.99 82.11 5972437.21 664630.22 9.00 870.26 180.00 KOP
10220.00 79.29 61.54 8847.07 -2698.56 99.50 5972447.02 664647.41 25.00 884.14 180.00 MWD
10240.00 74.29 61.54 8851.64 -2689.28 116.62 5972456.67 664664.31 25.00 897.79 180.00 MWD
10262.00 68.79 61.54 8858.60 -2679.34 134.95 5972467.01 664682.43 25.00 912.42 180.00 3
10280.00 73.29 61.54 8864.45 -2671.23 149.92 5972475.44 664697.21 25.00 924.36 0.00 MWD
10289.53 75.67 61.54 8867.00 -2666.85 157.99 5972480.00 664705.18 25.00 930.80 0.00 E-39A
10300.00 78.29 61.54 8869.36 -2661.99 166.96 5972485.05 664714.04 25.00 937.95 360.00 MWD
10320.00 83.29 61.54 8872.56 -2652.59 184.31 5972494.83 664731.18 25.00 951.80 0.00 MWD
10340.00 88.29 61.54 8874.03 -2643.09 201.84 5972504.72 664748.49 25.00 965.78 0.00 MWD
10349.64 90.70 61.54 8874.11 -2638.49 210.31 5972509.50 664756.87 25.00 972.54 0.00 4
10375.00 90.70 64.58 8873.80 -2627.01 232.92 5972521.47 664779.21 12.00 990.80 90.00 MWD
10400.00 90.70 67.58 8873.50 -2616.87 255.76 5972532.11 664801.83 12.00 1009.69 90.04 MWD
10425.00 90.69 70.58 8873.19 -2607.95 279.11 5972541.54 664824.98 12.00 1029.41 90.07 MWD
10450.00 90.68 73.58 8872.89 -2600.26 302.90 5972549.75 664848.58 12.00 1049.90 90.11 MWD
10475.00 90.68 76.58 8872.60 -2593.83 327.05 5972556.71 664872.59 12.00 1071.12 90.15 MWD
10500.00 90.67 79.58 8872.30 -2588.67 351.51 5972562.40 664896.92 12.00 1093.00 90.18 MWD
10525.00 90.65 82.58 8872.02 -2584.79 376.20 5972566.82 664921.52 12.00 1115.48 90.22 MWD
10550.00 90.64 85.58 8871.73 -2582.22 401.06 5972569.94 664946.32 12.00 1138.50 90.25 MWD
10575.00 90.62 88.58 8871.46 -2580.94 426.03 5972571.76 664971.25 12.00 1162.01 90.29 MWD
10600.00 90.61 91.59 8871.19 -2580.98 451.02 5972572.27 664996.24 12.00 1185.92 90.32 MWD
10625.00 90.59 94.59 8870.93 -2582.33 475.98 5972571.47 665021.22 12.00 1210.18 90.35 MWD
10650.00 90.57 97.59 8870.68 -2584.98 500.84 5972569.37 665046.13 12.00 1234.73 90.38 MWD
10675.00 90.54 100.59 8870.44 -2588.92 525.52 5972565.96 665070.89 12.00 1259.48 90.41 MWD
10700.00 90.52 103.59 8870.20 -2594.16 549.96 5972561.27 665095.44 12.00 1284.39 90.44 5
10725.00 90.52 100.59 8869.98 -2599.39 574.40 5972556.57 665119.99 12.00 1309.29 270.00 MWD
10750.00 90.52 97.59 8869.75 -2603.34 599.08 5972553.17 665144.75 12.00 1334.05 269.97 MWD
10775.00 90.51 94.58 8869.53 -2605.99 623.94 5972551.06 665169.65 12.00 1358.59 269.95 MWD
10800.00 90.51 91.58 8869.30 -2607.33 648.90 5972550.27 665194.63 12.00 1382.86 269.92 MWD
10825.00 90.50 88.58 8869.08 -2607.37 673.90 5972550.78 665219.62 12.00 1406.77 269.89 MWD
10850.00 90.49 85.58 8868.87 -2606.10 698.86 5972552.60 665244.55 12.00 1430.27 269.87 MWD
10875.00 90.49 82.58 8868.65 -2603.52 723.72 5972555.72 665269.35 12.00 1453.30 269.84 MWD
10900.00 90.47 79.58 8868.44 -2599.65 748.42 5972560.13 665293.95 12.00 1475.78 269.81 6
10925.00 90.47 82.58 8868.24 -2595.77 773.11 5972564.55 665318.55 12.00 1498.26 90.00 MWD
10950.00 90.47 85.58 8868.03 -2593.20 797.98 5972567.67 665343.35 12.00 1521.28 90.02 MWD
10975.00 90.47 88.58 8867.82 -2591.93 822.94 5972569.48 665368.28 12.00 1544.79 90.05 MWD
11000.00 90.46 91.58 8867.62 -2591.96 847.94 5972570.00 665393.27 12.00 1568.70 90.07 MWD
11025.00 90.46 94.58 8867.42 -2593.31 872.90 5972569.20 665418.25 12.00 1592.96 90.10 MWD
11050.00 90.45 97.59 8867.22 -2595.96 897.75 5972567.10 665443.16 12.00 1617.51 90.12 MWD
11075.00 90.44 100.59 8867.02 -2599.91 922.43 5972563.69 665467.92 12.00 1642.27 90.15 MWD
11100.00 90.43 103.59 8866.83 -2605.14 946.88 5972559.00 665492.47 12.00 1667.17 90.17 MWD
11125.00 90.42 106.59 8866.65 -2611.64 971.01 5972553.02 665516.74 12.00 1692.15 90.19 MWD
11150.00 90.41 109.59 8866.46 -2619.40 994.77 5972545.79 665540.66 12.00 1717.15 90.22 7
11175.00 90.41 106.59 8866.28 -2627.16 1018.53 5972538.55 665564.59 12.00 1742.14 270.00 MWD
11190.00 90.41 104.79 8866.18 -2631.22 1032.97 5972534.81 665579.11 12.00 1757.13 269.98 8
11200.00 88.44 105.13 8866.28 -2633.80 1042.63 5972532.44 665588.83 20.00 1767.13 170.00 MWD
11225.00 83.52 106.01 8868.03 -2640.49 1066.65 5972526.28 665612.98 20.00 1792.05 170.00 MWD
11250.00 78.59 106.90 8871.92 -2647.48 1090.33 5972519.81 665636.81 20.00 1816.73 169.94 MWD
.
.
Baker Hughes Incorporated
BHI Planning Report
11263.95 75.85 107.41 8875.00 -2651.49 1103.32 5972516.09 665649.88 20.00 1830.33 169.80 E-39A
11275.00 73.68 107.82 8877.91 -2654.72 1113.49 5972513.09 665660.12 20.00 1841.00 169.68 MWD
11286.57 71.40 108.26 8881.38 -2658.13 1123.98 5972509.90 665670.68 20.00 1852.03 169.58 9
11300.00 74.07 108.01 8885.36 -2662.12 1136.17 5972506.18 665682.95 20.00 1864.85 354.81 MWD
11325.00 79.05 107.55 8891.17 -2669.55 1159.32 5972499.27 665706.26 20.00 1889.16 354.89 MWD
11350.00 84.04 107.12 8894.84 -2676.91 1182.91 5972492.42 665730.01 20.00 1913.88 354.99 MWD
11375.00 89.02 106.68 8896.36 -2684.16 1206.78 5972485.70 665754.03 20.00 1938.83 355.06 MWD
11379.94 90.00 106.60 8896.40 -2685.58 1211.51 5972484.39 665758.79 20.00 1943.76 355.08 10
11400.00 90.00 109.01 8896.40 -2691.71 1230.61 5972478.67 665778.02 12.00 1963.82 90.00 MWD
11425.00 90.00 112.01 8896.40 -2700.47 1254.03 5972470.43 665801.62 12.00 1988.77 90.00 MWD
11450.00 90.00 115.01 8896.40 -2710.44 1276.95 5972460.97 665824.75 12.00 2013.61 90.00 MWD
11475.00 90.00 118.01 8896.40 -2721.60 1299.32 5972450.31 665847.36 12.00 2038.26 90.00 MWD
11500.00 90.00 121.01 8896.40 -2733.91 1321.07 5972438.47 665869.38 12.00 2062.67 90.00 MWD
11525.00 90.00 124.01 8896.40 -2747.34 1342.15 5972425.51 665890.74 12.00 2086.75 90.00 MWD
11550.00 90.00 127.01 8896.40 -2761.86 1362.50 5972411.44 665911.41 12.00 2110.46 90.00 MWD
11575.00 90.00 130.01 8896.40 -2777.42 1382.06 5972396.31 665931.30 12.00 2133.71 90.00 MWD
11600.00 90.00 133.01 8896.40 -2793.99 1400.78 5972380.16 665950.38 12.00 2156.46 90.00 MWD
11625.00 90.00 136.01 8896.40 -2811.51 1418.61 5972363.03 665968.58 12.00 2178.63 90.00 MWD
11650.00 90.00 139.01 8896.40 -2829.95 1435.50 5972344.98 665985.87 12.00 2200.17 90.00 MWD
11675.00 90.00 142.01 8896.40 -2849.24 1451.39 5972326.04 666002.18 12.00 2221.01 90.00 MWD
11700.00 90.00 145.01 8896.40 -2869.33 1466.26 5972306.28 666017.49 12.00 2241.10 90.00 MWD
11725.00 90.00 148.01 8896.40 -2890.18 1480.05 5972285.74 666031.73 12.00 2260.39 90.00 MWD
11750.00 90.00 151.01 8896.40 -2911.72 1492.74 5972264.48 666044.89 12.00 2278.82 90.00 MWD
11775.00 90.00 154.01 8896.40 -2933.89 1504.28 5972242.57 666056.91 12.00 2296.33 90.00 MWD
11790.00 90.00 155.81 8896.40 -2947.47 1510.64 5972229.13 666063.56 12.00 2306.39 90.00 11
11800.00 90.00 154.61 8896.40 -2956.55 1514.83 5972220.15 666067.96 12.00 2313.05 270.00 MWD
11825.00 90.00 151.61 8896.40 -2978.85 1526.14 5972198.11 666079.75 12.00 2330.38 270.00 MWD
11850.00 90.00 148.61 8896.40 -3000.52 1538.60 5972176.72 666092.68 12.00 2348.63 270.00 MWD
11875.00 90.00 145.61 8896.40 -3021.51 1552.17 5972156.03 666106.71 12.00 2367.75 270.00 MWD
11900.00 90.00 142.61 8896.40 -3041.76 1566.83 5972136.11 666121.81 12.00 2387.69 270.00 MWD
11925.00 90.00 139.61 8896.40 -3061.22 1582.52 5972117.00 666137.92 12.00 2408.39 270.00 MWD
11950.00 90.00 136.61 8896.40 -3079.82 1599.21 5972098.77 666155.02 12.00 2429.79 270.00 MWD
11975.00 90.00 133.61 8896.40 -3097.53 1616.86 5972081.45 666173.04 12.00 2451.84 270.00 MWD
12000.00 90.00 130.61 8896.40 -3114.29 1635.40 5972065.10 666191.95 12.00 2474.47 270.00 MWD
12025.00 90.00 127.61 8896.40 -3130.06 1654.80 5972049.77 666211.69 12.00 2497.63 270.00 MWD
12050.00 90.00 124.61 8896.40 -3144.79 1674.99 5972035.48 666232.20 12.00 2521.25 270.00 MWD
12075.00 90.00 121.61 8896.40 -3158.44 1695.93 5972022.29 666253.43 12.00 2545.27 270.00 MWD
12100.00 90.00 118.61 8896.40 -3170.98 1717.56 5972010.23 666275.33 12.00 2569.61 270.00 MWD
12125.00 90.00 115.61 8896.40 -3182.37 1739.81 5971999.33 666297.82 12.00 2594.22 270.00 MWD
12139.00 90.00 113.93 8896.40 -3188.24 1752.52 5971993.75 666310.66 12.00 2608.09 270.00 TO
12140.00 90.00 113.81 8896.40 -3188.64 1753.44 5971993.36 666311.58 12.00 2609.09 270.00 MWD
BP Amoco
weUPATH DETAILS
Plall illS E-39:A
W02922Sß.701
ParentWe11p.ath: E·39
Tie on MD: 10107.66
Rig: N.o.nflc 1
of,D.tI,un: 62: 395131t19-iH> 11:23
V.Seetwn Origin ~ID!t; Starting
....,. .Hi·S F~ T\IÐ
900
800
700
600
500
1400
300
200
00
000
900
800
700
600
500
400
300
200
00
00
-200
-300
-500 -400
-800
....8
C
~8
0:::
CI
!2.8
J:
'S,8
IJ>
mQ8
1J>1i
mU8
J::I'-
:::;1:::
CI) 11I8
:>
1J>8
:¡
..
... 8900
750 800 850 900 950 100010501100115012001250130013501400145015001550 1600 1650 1700 1750 1800 1850 1900 195020002050210021502200225023002350240024502500 2550 2800 2850-.J
Vertical Section at 107.00·
. PM
Nordic 1 slimhole
All Measurements are from top of Riser
2/25/2004
~
(])
en
.-
cr:
top of bag
BAG
7 1/16" 5000psi
bttm of bag
middle of slips
Blind/Shears
.........................,
middle of pipes
TOTs
......................····7 1/16" 5000psi
middle of flow cross
Mud Cross
Mud Cross
71/16" 5000psi
middle of blind/shears
.........................,
middle of pipe/slips
TOTs
......................····7 1/16" 5000psi
P055225
DATE
1/6/2004
f CHECK NO,
055225
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
NET
1/6/2004
PR0105041
PERMIT TO DRILL
C39fT
H
.
TOTAL ....
THE AlTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
BP EXPLORATION, (ALASKA) INC.
PRUDHOE BAY UNIT
PO BOX 196612
ANCHORAGE, AK 995J9-6612
NATIONAL CITY BANK
Ashland, Ohio
56,389
412
No.P 055225
CONSOLIDATED COMMERCIAL ACCQUNT
PAY:
BP [f.~ ..I"~ (iii:,
. . ..-:':. " . .:J..l ...~Utl
AMOUNT
***1"1"**$100.00*******
TO THE
ORDER
OF:
STATE OF ALASKA
AOGCC
333 WEST 7TH AVENUE
ANCHORAGE, AK 99501-3539
R120 DAYS
-::...... ..;....;....:. ...~.1:'~...;;.._., - :_"~:..:,,,. ,'. - "'., '-~~;
... n. ", -<~ '"'~''' ... ..~.}\........, ...... "'1
/:':.::?:.,::':..... ".\":',\\;". '·~·····...::90~~~~l~~:K\
bij};. .¡~tI~{i~¡~~;~\,:'£¿J
.
II- 0 5 5 2 2 511- I: 0.... ~ 20 :I B g 5 I: 0 ~ 2 7 8 g b II-
.
.
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLN~.d'« ¿= 39/1
PTD#
2aC¿l-oCYd
p
X Development
Service
Exploration
Stratigraphic
CHECK WHAT ADD-ONS "CLUE"
APPLIES (OPTIONS)
MULTI Tbe permit is for a new wenboresegment of
LATERAL existing well .
Permit No, API No. . .
(If API num ber Production. sbould continue to be reported as
last two (2) digits a function' of tbe original API number. stated
are between 60-69) above.
PILOT HOLE In accordance witb 20 AAC 25.005(1), a11
(PH) records, data and logs acquired for tbe pilot
bole must be clearly differentiated In botb
name (name on permit plus PH)
and API Dumber (50 -
70/80) from records, data and logs acquired
for wen (name on permit).
SPACING Tbe permit is approved subject ·to fuD
EXCEPTION compliance witb 20 AAC 25.055~ Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes tbe liability of any
protest to tbe spacing exception tbat may
occur.
DRY DITCH An dry ditcb sample sets submitted to tbe
SAMPLE Commission must be in no greater ·tban 30'
sample intervals from below tbe permafrost
or from wbere samples are first caugbt and
10' sample h:itervaJs tbrougb target zones.
.
.
Well bore seg D
Annular Disposal D
640150 Well Name: PRUDHOE BAY UNIT E-39A .____Program DEV
INC Initial ClasslType DEV /1~ GeoArea 890 Unit JJ650 On/Off Shore On
- -
Administration Permit fee attache.d ~ Xes - - - - - - - - - - -
2 .Lease ~numberappr~riate ~ ~ ~ Yes ~ - - - - - - -
3 .U.n[que welt n~ame ~and Ol!mb.er .. . . . . ~ . ~ . . Yes - - - - - - - - - - - - - - - - - - - -
4 Well Jocated ina define.d -pool ~ ~~~~~~~~Xes - - - - - - - -
5 WellJocated proper .d [stan ce. from driJling unitbound~ary~ ~ ~ ~ ~ ~ ~ ~ ~ Yes - - - - - - - - - - - -
6 WeHJocated prpper ~d[stance. from otber wells. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~Yes
7 ~S.ufficient ~acrea~e.aYailable ¡n~dJilJiog unjt ~ . ~ Xes - - - - - - - - - - - - -
8 Jf.deviated, js~ weJlbore platincJuded - - - - - .~~~~~Xes - - - - - - - - - - - - - - - - - - - -
9 O-perator only: affected party . - - - - - - - - ~ ~ ~ ~ ~ ~ ~ ~ Yes - - - - - - - - -
10 .O-perator bas.appropr[ate. Qond in Jorce ~ ~ . . . . ~ . . . - - - -- . . . ~ ~ . . . .N.o. - - - - - - - - - - - - - - - - - - - -
11 Permit c~an be [sSl!ed witbout co~nserva~tion order. ~ ~ Xes - - - - - - - - - - - - - - - -
Appr Date 12 Permit cao be [sSl!ed witbout ad.ministrati\(e.approvaJ ~ ~ N.o~ - - - - - - - --
RPC 3/1/2004 13 Can permit be approved before 15-day wait Yes
14 WellJocated within area and.strata ~authQr[zed by Injectioo Ord~er # (putlO# in cpmm~eots) (For. NA - - - - - - - - - - - -
15 .AJI wells~ wit!1in Jl4.llJile.area.of reyiew jdeoUfied (Fpr servjce.w.e[l only:). . . . . . . . . . . ~ ~ .NA - - - - - - - - - - - - - - - - - - - -
16 PJe-produ~ced injector; .dvratio~n~of pre--pro.dvctiooless than :3 montbs~ (For.seryice well only) NA - - - - - - - - - -
17 .ACMP Fïndjng.of Con~si.$tency.has been jssued~ for~ tbis proieçt NA - - - - - - - - - - - - - - - - -
Engineering 18 ~C.onductor string~PJov[ded ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ . . . . ~ NA - - - - - - --
19 .S.urfaœ.casing~pJotects alLknown USDWs ~ ~ ~ ~ - - - - - - - ~NA - - - - - - - - - - - - - - - - - -
20 ~CMTvoladequ~ate.to circulateon~cond~uctor~& surfcsg ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ NA - - - - - - - - - - - - - - - - -
21 ~CMT vol adequ~ate.to tie-in Jongstring to surf csg~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~NA - - - - - - -- - - - -
22 CMT will coYer~aJl know.nproductiye borilon.s . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Yes - - - - - - - - - - - - - -
23 ~C~asing de~signs adeQua.te for C,~ r, B ~&~ RerllJafrpst Yes - - - - - - - - - - - --
24 A.dequateJan~kage~oJ re.serye pit ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ . . . ~ ~ ~ ~ .Yes CTDU. ~ ~ ~ . ~ . . ~ ~ . ~ ~ ~ ~ ~
25 Ka~re-drill~ basa l0.-403 for abandonment been apPJoved ~ Yes *
- - - - - - - - - - - - - - - - - -
26 A.dequatewe[lQore separatjo.n~proposed. . . . . . . . . . . . . ~ ~ . . . . Yes - - - - - - - - - - - - - -. - - - --
27 Jtdjverter Jeq~uiJed. does jt meet reguJatiolJs. . ~ ~ ~ . ~ ~ ~ NA Sidetrack. ~ . ~ ~ ~ ~
Appr Date 28 .DJilIiog f]ujd~ Rrogram schematic~& equip Jistadequate ~ . Yes Max MW8, 7. RP9.~ ~ ~ ~
WGA 3/1/2004 29 .BOPEs,dpthey meet reg uJatio IJ ~ ~ ~ ~ ~ ~ . . ~ - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - -
30 .BOPE-Pfess ratiog appropriate; Jest to -<put psig in ~commentsL ~ . ~ Yes Test to 3500. RS[. ~MSf) 2194 psi.
31 .C~hoke.manjfold compJies w/APtRf)-53 (May 84)~ ~ ~ ~ Yes - - - - - - - - - -
32 Work will occur withoutoperç¡tjon ~sbl!tdown~ . . ~ ~ ~ ~ Yes
33 Js presence of H2S gas~ RrOQable ~ - - - - - -. No. - - - - - - - - - -
34 Meçhan[caLcpodjUon J){wells within 80R yerified (For~s~ervice welJ only) NA Development wel
Geology 35 Permit can be [sSl!ed wfo hydrogen~ s~ulfide meas!]res No
36 ~D.ata~PJeseoted on~ Rote.ntial oveJPres~svr.e ~zOlJes ~ ~ NA
Appr Date 37 Beismic~analysjs~ of sbaJlow gas~zones~ ~ NA
RPC 3/1/2004 38 ~SeaQe.dconditiolJ Sl!rvey -<if off-shJ)re) ~ ~NA
39 ~ Conta~ct namelphoneforw.eekly progress )rts [I NA
-
Geologic Date: Engineering Date
Commissioner J}?I1- Commissioner
Dfs
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
e
e
~()f-o¥cJ
/2 Ç:,3Ç,
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Fri Aug 20 15:55:44 2004
Reel Header
Service name.............LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 04/08/20
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......Ol
Previous Reel Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.............LISTPE
Date.....................04/08/20
Origin.................. .STS
Tape Name................UNKNOWN
Continuation Number......Ol
Previous Tape Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
E-39A
500292258701
BP Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
20-AUG-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
MW0002976242
S. LATZ
EGBEJIMBA/KO
MWD RUN 3
MW0002976242
S. LATZ
EGBEJIMBA/KO
MWD RUN 4
MW0002976242
S. LATZ
EGBEJIMBA/KO
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 5
MW0002976242
B. JAHN
KOLSTAD/HILD
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
6
UN
14E
3358
501
65.60
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
3.000 4.500 10163.0
#
REMARKS:
RECE\VED
SEP 0 ~5 2004
Äl8$Ka Oil & Gas Cons. comm\sSØI
Ancnorage
e
e
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED. THESE DEPTHS
ARE BIT DEPTHS.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF
WHICH WAS AT 10161' MD
AND THE BOTTOM WAS AT 10169' MD.
4. MWD RUN 1 WAS TO SET THE WHIPSTOCK AND DO THE INITIAL
TIE-IN. NO DATA ARE
PRESENTED.
5. MWD RUNS 2 - 5 COMPRISED DIRECTIONAL WITH NATURAL
GAMMA RAY (PCG)
UTILIZING SCINTILLATION DETECTORS.
6. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A
CASED-HOLE GAMMA RAY
PROVIDED TO SSDS BY K. COONEY (SIS/BP) ON 8/19/04.
LOG HEADER DATA RETAIN
ORIGINAL DRILLER'S DEPTH REFERENCES.
7. MWD RUNS 2 - 5 REPRESENT WELL E-39A WITH API#:
50-029-22587-01. THIS WELL
REACHED A TOTAL DEPTH (TD) OF 12118'MD/8883'TVDSS.
SROP
SGRD
$
SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SMOOTHED NATURAL GAMMA RAY.
File Header
Service name.............STSLIB.001
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/08/20
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
9900.0
10175.5
STOP DEPTH
12091. 0
12112.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
9900.0
9905.5
9918.0
9921. 5
9926.0
10154.5
10156.5
10162.0
10164.0
10167.5
10191. 5
10195.0
10202.0
10207.5
10209.5
10216.0
GR
9900.5
9906.0
9917.5
9920.0
9924.0
10158.0
10160.5
10165.5
10167.0
10169.0
10194.5
10198.5
10205.5
10210.5
10213.5
10220.0
e
e
10221. 0
10224.0
10231. 5
10236.0
10252.5
10286.5
10298.0
10307.5
10316.5
10318.0
10319.5
10321.5
10324.5
10327.5
10335.0
10339.0
10347.0
10360.5
10369.5
10379.5
10394.5
10405.5
10421.0
10443.0
10446.0
10464.5
10475.5
10492.0
10495.5
10498.0
10612.0
10628.0
10649.5
10655.0
10659.5
10670.5
10677.5
10683.0
10688.5
10708.0
10718.0
10730.5
10764.0
10774.0
10791.0
10823.5
10827.0
10830.0
10844.5
10856.5
10870.5
10894.0
10909.0
10915.5
10919.5
10926.0
10934.5
10937.5
10953.5
10957.5
10961.5
10972.0
10977.5
10980.5
10986.5
10994.5
11013.0
11017.5
11028.0
11044.0
11047.5
11054.0
11059.0
11080.5
11086.5
10225.5
10229.0
10235.0
10239.0
10257.5
10294.5
10305.0
10313.5
10322.5
10324.0
10326.0
10327.0
10330.0
10333.5
10341.0
10346.0
10355.0
10368.5
10377.5
10386.5
10403.0
10414.5
10429.0
10452.0
10455.0
10472.5
10481. 5
10498.5
10503.0
10507.5
10621. 5
10636.0
10654.5
10663.0
10668.0
10678.0
10684.5
10690.0
10696.5
10714.5
10726.5
10738.0
10771.5
10781.0
10796.0
10829.5
10834.0
10837.5
10853.0
10865.0
10879.0
10896.5
10912.0
10919.0
10923.0
10928.0
10937.5
10940.5
10956.5
10960.0
10964.0
10976.0
10980.5
10984.5
10992.0
10999.5
11017.0
11023.0
11033.5
11048.5
11 052.5
11059.5
11065.5
11087.5
11092.0
e
e
11109.5
11159.5
11184.5
11188.5
11195.0
11210.0
11222.5
11233.0
11244.0
11247.5
11251.0
11256.5
11268.0
11270.5
11274.5
11290.5
11300.5
11307.5
11309.0
11312.5
11322.0
11324.5
11329.5
11332.5
11340.5
11344.0
11345.0
11348.0
11356.5
11361. 5
11369.5
11372.5
11377.0
11379.5
11398.0
11406.5
11410.0
11427.0
11435.5
11440.0
11448.5
11491. 0
11495.0
11500.0
11521. 5
11532.5
11543.0
11562.5
11595.5
11598.5
11603.0
11613.5
11637.5
11652.5
11656.0
11666.0
11670.5
11675.5
11694.0
11697.0
11708.5
11710.0
11725.5
11729.0
11737.0
11743.0
11753.0
11756.0
11759.5
11768.0
11789.5
11795.5
11802.5
11823.0
11826.5
11117.5
11165.5
11189.0
11192.0
11200.0
11215.5
11229.0
11239.5
11249.0
11252.0
11257.0
11262.5
11272.0
11274.5
11277.5
11297.5
11306.0
11312.0
11314.5
11318.0
11327.0
11331. 0
11336.0
11339.5
11347.0
11350.5
11353.0
11357.0
11364.0
11368.0
11376.5
11380.5
11384.5
11387.0
11406.5
11413.5
11416.5
11430.0
11438.5
11444.0
11452.0
11494.0
11499.0
11503.5
11527.0
11537.5
11548.5
11568.0
11605.0
11608.5
11613.0
11623.0
11647.5
11662.5
11666.0
11676.5
11680.0
11686.5
11704.0
11706.0
11717.0
11719.0
11733.0
11737.0
11745.5
11 7 51. 0
11760.5
11764.0
11767.0
11777.0
11797.0
11805.5
11813.0
11833.5
11837.5
e
e
11833.0
11837.5
11847.0
11851.0
11855.5
11856.5
11864.0
11868.0
11872.5
11886.0
11892.0
11896.5
11900.5
11958.5
12016.0
12032.0
12054.5
12112.5
$
11844.0
11848.0
11857.0
11860.0
11864.5
11866.0
11874.5
11878.5
11883.0
11897.5
11901.5
11906.5
11912.5
11968.5
12022.0
12036.5
12059.5
12117.5
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
BIT RUN NO
2
3
4
5
MERGE TOP
9900.5
10263.0
10293.0
11600.0
MERGE BASE
10263.0
10293.0
11600.0
12117.5
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name
DEPT
ROP
GR
Service Order
Units
FT
FT/H
API
Size Nsam
4 1
4 1
4 1
Code
Offset
o
4
8
Channel
1
2
3
MWD
MWD
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9900 12112.5 11006.3 4426 9900 12112.5
ROP MWD FT/H 0.18 1493.91 65.8846 3875 10175.5 12112.5
GR MWD API 13.41 761 .17 79.0536 3948 9900 12091
First Reading For Entire File..........9900
Last Reading For Entire File...........12112.5
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/08/20
Maximum Physical Record..65535
File Type............... .LO
Next File Name...........STSLIB.002
Physical EOF
File Header
e
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......04/08/20
Maxj.mum Physical Record.. 65535
File Type............... .LO
Previous File Name.. .... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
e
header data for each bit run in separate files.
2
.5000
START DEPTH
9900.5
10177.5
STOP DEPTH
10239.0
10263.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.............. ...Down
Optical log depth units...... .....Feet
Data Reference Point..............Undefined
20-MAR-04
Insite
Memory
10263.0
10161. 0
10263.0
69.4
83.9
TOOL NUMBER
TLG013
3.000
10163.0
Water
8.60
.0
9.0
22000
.0
Based
.000
.000
.000
.000
.0
141.7
.0
.0
e
e
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD020
GR MWD020
Units
FT
FT/H
API
Size Nsam
4 1
4 1
4 1
Code
Offset
o
4
8
Channel
1
2
3
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9900.5 10263 10081. 8 726 9900.5 10263
ROP MWD020 FT/H 1.18 85.42 36.3381 172 10177.5 10263
GR MWD020 API 13.41 761. 17 70.9123 232 9900.5 10239
First Reading For Entire File..........9900.5
Last Reading For Entire File...........10263
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......04/08/20
Maximum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/08/20
Maximum Physical Record. .65535
File Type................ LO
Previous File Name.......STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
3
.5000
START DEPTH
10239.5
10263.5
STOP DEPTH
10269.0
10293.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
21-MAR-04
Insite
Memory
10293.0
10263.0
10293.0
82.3
82.3
#
TOOL STRING (TOP TO BOTTOM)
e
VENDOR TOOL CODE
PCG
$
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD030
GR MWD030
Units
FT
FT/H
API
Size Nsam
4 1
4 1
4 1
Rep
68
68
68
Code
e
TOOL NUMBER
TLG013
3.000
10163.0
Water
8.70
.0
9.0
32000
6.0
Based
.000
.000
.000
.000
.0
141.7
.0
.0
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10239.5 10293 10266.3 108 10239.5 10293
ROP MWD030 FT/H 0.88 967.93 66.0857 60 10263.5 10293
GR MWD030 API 38.7 114.76 83.2217 60 10239.5 10269
First Reading For Entire File..........10239.5
Last Reading For Entire File...........10293
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/08/20
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.004
Physical EOF
e
File Header
Service name.............STSLIB.004
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......04/0B/20
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
4
e
header data for each bit run in separate files.
4
.5000
START DEPTH
10269.0
10293.5
STOP DEPTH
11576.0
11600.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
23-MAR-04
Insite
Memory
11600.0
10293.0
11600.0
76.7
97.7
TOOL NUMBER
TLG013
3.000
10163.0
Water
8.70
.0
9.0
32000
6.4
Based
.000
.000
.000
.000
.0
154.3
.0
.0
e
e
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
Size
4
4
4
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
ROP
GR
MWD040
MWD040
Nsam
1
1
1
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10269 11600 10934.5 663 10269 11600
ROP MWD040 FT/H 0.2 1493.91 66.0817 2614 10293.5 11600
GR MWD040 API 19.04 259.09 85.9372 2615 10269 11576
First Reading For Entire File..........10269
Last Reading For Entire File...........11600
File Trailer
Service name.............STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/08/20
Maximum Physical Record..65535
File TY'Pe............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation.......04/08/20
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
5
header data for each bit run in separate files.
5
.5000
START DEPTH
11576.5
11600.5
STOP DEPTH
12096.0
1211 7.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
25-MAR-04
Insite
Memory
12118.0
11600.0
12118.0
78.2
95.4
· .
e
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units... ... .... .Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units...................... .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD050
GR MWD050
Units
FT
FT/H
API
Size
4
4
4
Nsam
1
1
1
Rep
68
68
68
Code
e
TOOL NUMBER
TLG015
3.000
10163.0
Water
8.70
.0
9.5
33000
7.2
Based
.000
.000
.000
.000
.0
154.3
.0
.0
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11576.5 1211 7.5 11847 1083 11576.5 1211 7.5
ROP MWD050 FT/H 0.18 417.68 70.1084 1035 11600.5 1211 7.5
GR MWD050 API 24.33 198.51 62.4816 1040 11576.5 12096
First Reading For Entire File..........11576.5
Last Reading For Entire File...........12117.5
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......04/08/20
Maximum Physical Record..65535
File Type............... .LO
Next File Name... ........STSLIB.006
Physical EOF
· .
e
-
Tape Trailer
Service name.............LISTPE
Date.....................04/08/20
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number......Ol
Next Tape Name...........UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name.............LISTPE
Date.................... .04/08/20
Origin...................STS
Reel Name................UNKNOWN
Continuation Number......Ol
Next Reel Name...........UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File