Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
196-084
RECEIVED STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N APR 2 6 2016 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed I2 Abandon 17I Plug Perforations 0 Fracture Stimulate III Pull Tubing ❑ Operatibt tlh$�dtai' ❑ Suspend ❑ Perforate El Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well 0 Other:Open Sliding Sleeve Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 196-084 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22526-01-00 7. Property Designation(Lease Number): ADL 0028282 8. Well Name and Number: PBU R-39A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 10748 feet Plugs measured 9040 feet true vertical 8900 feet Junk measured feet Effective Depth: measured 9040 feet Packer measured 8907 feet true vertical 8606 feet Packer true vertical 8510.96 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20"91.5#H-40 41 -120 41 -120 1490 470 Surface 2410 10-3/4"45.5#NT-8 41 -2451 41 -2432 4560 1730 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9295-10303 feet 10303-10352 feet 10352-10748 feet True vertical depth: 8732-8818 feet feet 8818-8817 feet 8817-8900 feet Tubing(size,grade,measured and true vertical depth) 3-1/2"9.2#13Cr80 37-9131 37-8661 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): 2 Treatment descriptions including volumes used and final pressure: SCA�114ED JUN 4 20161 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Shut-In 1629 218 Subsequent to operation: 15 1835 3067 1673 209 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry Ft(Wipro)A Title PDC Principal Engineer Signature Cid Phone +1 907 564 4424 Date 4/25/16 Form 10-404 Revised 5/2015 11 7-1– Y II l RBDMS (--APR 1 7 2018 Submit Original Only • • d 0,0000000 C) Mf� f�O) 0 0 0 0 0 LC) N N N 0 0 U N 00 0 0 0 0 0 0 0 i O) CO C)) - - •;1- M M CD IC) M N- N- N- m V CO N- N- � C10 CO • M 0 O O CO 000 CO 00 CO CO00 CO 1 i , i i i I 1 H CO CA O O O CO 0) 0) N- cl Nr O CO0000 M CO ON 0 M M L • N V 0 0 O 0 0 o o CUi i i i i i i i Q Q O T- 0 CA M O M O O CD_ v vv4 40) 0)0) ZM _ CO o 00 c) O o 0 C) Coo °O0° CD c1 CO CDUUU • Z Z J J J M M co = 13) * IO k # *k * * � •(� Nl!) O 0 N CO N NI- N - - - NNCA o N � �- Oc N h 10IC) If) O N N r �- V t r+ CO N 0) r5) 0 0 CO 0 O C N- O CO 0) r O ) N " M (A -J W W W CF- W � O � U U 0C L c Z Z WWWWWWm H I H p � z z zD U (nZZZJJJ � • • Packers and SSV's Attachment PBU R-39A SW Name Type MD TVD Depscription R-39A TBG PACKER 8907.06 8510.96 4-1/2" HES TNT Perm Packer R-39A PACKER 9031.4 8600.62 3-1/2" Baker KB Top Packer R-39A PACKER 9131.11 8660.79 5-1/2" BAKER ZXP PACKER 0 • a • C QU co .0 0 `U m -a o-o Z Ln a a) N -o E ' - — 0 II . c -a L a) u)'J 'tn 03 C N (D d (/) CD CD IL O 0_-C TO a) m N Q N I JJ O a O CO IL W y -o 0 - (7) - -0 ON = U) E a) J 0 D a) N (N a) "' (n — E ILo fa 0) > o o_ a) O 2 L — as Cu a) * E 73 J 0-.0 -o O L U * O W CO OEC . 0 C J O N to W 0 0) O O >co _ 0-Q LO J O J n 0 C Q 000 � E � C > N C W > Q O- a) o Z �` v.- (3 CO O O < O O u- U N D V 0 L — * (n U 0 N O a) O m N a) « uj LC O O -O Q L 4- a) (n 5 o N O a © co 0) x co o c H _ C_ p En # C Q ,-. J a) C H e E .O `m 5 E a) C N �. U L (0 . C 'C i u) 0 W c6 L O . oLo -a a) 0 > (A a) N a) CC E +=+ wQ°o a) -oc a) Q te a) L � a2 N D CCI Q ,c a o o o_ m n a) w 2 � o oQ .N 0ccoo o nEa) 0 >o *K u) M ca �° � m O LL w o N cc , * = o ff (0o a u) H O < a) > • .a Q d co o N W 0 0 c 0 0- N COz 0 a W ) J O E p a) O ) _ p O m N c) W LL () H N N f N 0 I-- 'l c+) © U O re H - ,— Q U- - COCM0o°'oCD a) o Mu) bo O = N C O O H -'-' r-- < 0@)--- (') ._C O O J N 0 m U � 0 0 J Z J a) O L� C a (n o ami * I, ( (a rn w > cA O . •C J = fl 0 2 H II 06 O co * * II � co Q W (l) a co . () H W a M (0 (0 CO 0 0 w O p L 03 H Z 0 Q> co N a) O \ 0 4_ � eL O (/) .0) 0 co 0- 0 u) E � o c E -00 (:) 2w � v) L6 = w 2 d Ha) .- c OOMH QII II 0 � ' Q (A ca OH � � 0 = H (n Qa) a M E o (n > W Z@Z . � (nom ww a) � 0 c0 0 0 � < c o00 2 0 Or-NZ a) = Q CI co � rn o OM = m0 � mo (n o c0)omu � N a .C.2 --2 a) ` -0a � ° > O _ JOM � 0 _ 00 - O L = c,_.c uj a) a) O > (!) d O QO H (A ON E L a aLO WLL (oIA • ' W 0) -0 ao 00 oZ N. N L C C M C- Ca X C H — 0) W N C W H CO 0 N C p O d U Z J _� Z l� a3 C D C O W f� N Q" _ N O O a) O U CO O II Z N ao Z C O 0 M H W Lji J O O -a II Z •, C II * 175 --5 o oma ' II (Ln oma- ) ONNO II o a) oaOZ > Zww (a a) O o o c c � � 0 mv) � UZHUO N o .. >=> U W W � - = L a) O o x x " o d 4, < W * — L - O > * < J < J 4, a) 0 n H � ai � E : : i="" .g.. : c coi— aO ou wwr:Cw « O 2 O W H 4 CO CO co O CO >- 0 0 0 0 00 CO M H N N C\IL Lo Lo 5 O O c- m v- co M M co ♦- M M M co M 0 Q TREE= WELLFEAD= awH41/FMC • R-39A SOY NOTES: WELL ANGLE/70"fp 9396""MAX ACTUATOR= BAKER C ®DLS:26°Q 10060'.CHROME TBG 8 LNR"'4-112- L1 SLID LNR ADJUSTED PER ORIG SET DEPTH MIAL KB.R F 60.3' BF.ELEV= 22_97' ‘";144 I_ KDP= 1951' • IP408• -7-5/8-IE...,^BTC ES CeNBYiHZ Max Angle 96°@ 11430 - 20 COAD' - -120' '-1� 440' H7-5/8•x 5-1/2'x0,D=4.892' 91.5#,H-40, -. Datum MD= NA +. Datum TVD= 8800'SS D=19.124' 1 1 ' 2234' -3-112'FES X NP,D=2.813' GAS UFT MANDRELS 5-1/2•BOVVt3J CSG PATCH,D=4.892' 462'-464' ST M) TVD DEV TYPE VLV LATCH PORT DATE it 16 3550 3463 22 KBG2 DOLE M 16 09/02/15 7-5/8'CSG STUB(05/30/15) -I 1975' E 5 5434 5219 21 KBG2 SO NT 20 09/02/15 10-3/4'CSG,45.5#, - 2451' 4 6687 6387 21 KBG2 DMI' NT 0 06111/15 NT-80CYHE NSCC,D=9.953• 3 7596 7'246 17 KBG2 DMI M 0 06/11/15 2 8252 7:-: STATE OF ALASKA 411,LASKA OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Set LT Packer-Cls Sly WI 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 196-084 3. Address: P.O.Box 196612 Anchorage, Development ® Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-22526-01-00 7. Property Designation(Lease Number): ADL 0028282 8. Well Name and Number: PBU R-39A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: qFCFIVFn Total Depth: measured 10748 feet Plugs measured feet true vertical 8900 feet Junk measured feet FFE 0 2 2[2, -, Effective Depth: measured 9031 feet Packer measured 8907 feet true vertical 8600 feet Packer true vertical 8510.96 feet A. E Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20"91.5#H-40 41 -120 41-120 1490 470 Surface 2410 10-3/4"45.5#NT-8 41-2451 41 -2432 4560 1730 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9295-10303 feet 9295-10303 feet 10303-10352 feet 10352-10748 feet True vertical depth: 8732-8818 feet 8732-8818 feet 8818-8817 feet 8817-8900 feet Tubing(size,grade,measured and true vertical depth) 3-1/2"9.2#13Cr80 37-9131 37-8661 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: 4 s, Intervals treated(measured): l__Ci*F,�yi� iti �/ t, k U'?f Treatment descriptions including volumes used and final pressure: 91115 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 72 2680 3583 1932 233 Subsequent to operation: 24 1702 3132 1591 212 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development 121 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature '/ (. / -' Phone +1 907 564 4424 Date 2/1/16 Form 10-404 Revised 5/201 V TL -Lim /6 6 Z/.v /,� Submit Original Only • • Q.00000000CY) mr M 0) CO CO CO O O O I- N N N O O 0 N O O f- N- U y 0 0 0 0 0 0 0 0 0 i o) CO a) 4 V V co co 3 V O 00 r- N- 4 Ca e- CO N- N- ti CO CO O O CO. O O N 00 00 CO 00 00 0 0 F- co O) O O O CO O) O) I- N NtO CO CO co 000 C CD CO N O O M N CO CO Cr) N '4" Nr 0) O O C- V CI .= 111111111Q < 0) '- CO 0) M C) C.,) ooN- C) , � � � 0.) `� C • .0 M • CQ CO 0 0 0 O O 000 O O O CO ° CO COCODUM Z CO CO N N N •cr N = - - N N • 0) U O = = •N N N ' •-• O M t a-- N N N N i LU In O O i r OO N V ca O 4 O) C co co 0) C N- 0 0) '- '- O JN d CO '— '— 0) W W W cm0F- QQQ cF- W 000 U UDu_ ccLLI L1.1 ccct cz Z W W W W W W m O DF- F- 1— ZZZD O U) ZZZJJJF- • • Packers and SSV's Attachment PBU R-39A SW Name Type MD TVD Depscription R-39A TBG PACKER 8907.06 8510.96 4-1/2" HES TNT Perm Packer R-39A PACKER 9031.4 8600.62 3-1/2" Baker KB Top Packer R-39A PACKER 9131.11 8660.79 5-1/2" BAKER ZXP PACKER • • ZDV , / � _ 222 , � G2 Q # o ' 5 I w < £ \ 5- > .- / a) \ \ q - 0 2 > k § � -I R E 715 \ 1k L Cr) T:I \ E / $ \ ¥ _ \< O LI- © 7 R °- & ± � E2 LO CO (D \ 0_ / f / �, / > / R2\ ± % 2 - / co > % f ® -0 0_ m aB # m 0 I— %ƒ G z ® 2 f ct cri / / > 8k > o // E u_ / i 5cƒ � % \ b , > GE 0bj / I = & om 9 L • o o - o - \ \ \ / 7 b / O \ / \ c/ 7 \ § E @ 7 / \ ± E E 2 2 ,® e § 9 R p G m H a _ c = c f / / k \ \ » 2 c_,,60 < p_ / 0 « u)co / f § m / ± * o e � .E ._ ok / / O 5 0 / 5 - J AL \ © 72E322 / Ic E .m 7 § , o I u) R 7 2 o L 2 < Q n = C o 3 2 2 2 < c a / \ ƒ ± O W CO * / / % < _2 w : o .Q 2 \ e \ L ƒ o / �/ / \ / k » \ ƒ CD / \ / *u- / / 0. _ _ / 2 2 2 $ 7 2 = 7 t m _1 rx Ce /\ % m \ 7 \ U k / » ° k E I \ E CL ƒ >+ o k f \ O R ƒ 5 / G .R a k / h \ 9-o. OcDo a - o u) - 2 C) c°,_ 5 ) U) O 0 H 0 Z 2 / E/ O 2 ® / / c _a � ƒ z / E � k % 7E - ƒ / q ¥ / _ c m ¢ 506 - / ƒ 722 ® = ƒ 0 / � a 6 -0 0 ƒ / -I n % § ci 2 2 / E i \ / / � k � / \ % kEz � § ¥ 2RRE2 \ 3 �� k• u) GOu � mm0w - c 7, 0222 ee ± - :3 - • < 3 < W -J3 2 % f / / \ / / / f f R E n e O t a $ O : i 2 a = O : a u ! z 6 L R < o o e e n / \ \ \ -Q cocv 5 f / + 9 ¥ r r r 0 < TREE= aw H 4-1/16" WELLFEAD= FMC • R-39A sfit NOTES: WELL ANGLE>70'@ 9396'""MAX DL . 6°@ 10050.CHROME TBG&LNR 4-1/2 NTIAL KBR F 60.3 " ACTUATOR= E3AKER C Ll SLTD LNR ADJUSTED 13'PER ORIG SET DEPTH . " BF.ELEV= 22.97' .2 t:l. '' •. ______ 408' —-7-5/8'1-ES BTC ES CEMENTER 1 20"COND, — -120'M :* File 440. —I-2234' —3-1/2---FES X ,D2.813" i"X 5-1/2"X0,D=4.892' t".**" 91.5#,H-40, Datum MD= NA -.'" _. II, III MP = ceturn-fvp_,. ----8800.ss ID=19.124' k . :.: • GAS LJFT MANDRELS 5-1/2"BOWB'l CSG PATCH,0=4.892' —452' -464' ,' b ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3550 3463 22 K13G2 DONE NT 16 09/02/15 7-5/8'CSG STUB(05/30/15) — 1975' 5 5434 5219 21 KBG2 SO NT 20 09102/15 4 6687 6387 21 KBG2 DMY NT 0 06/11/15 10-3/4'CSG,45,54, — 2451' 9.953 NT-80CY HE NSCC,13 3 7596 7246 17 KBG2 CAW NT 0 06/11/15 = ' 2 8252 7::; 6 KBG2 CMY NT 0 06/11/15 1 8782 8406 27 KBG2 DMY NT 0 06/11/15 Minimum ID = 1.781" @ 9031' I 8876' —3-1/2'HES X NP,ID=2B13 I k". R NIPPLE IN LTP . . , .4' 890T —15-1/2'X 3-1/2'FES TNT RUR,ID=2.830' 1,4... TOP OF 2-3/8'LNR — 9037' . 1: 9006' —3-1/2'FES SLD SLV,ID=2.813'CLOSED(1/5/16) ,•'*.•-, •7.7. 3-1/2'PERFORATED PUP JONT,D=2,992" — 9120' 1 - 9031' —35KB LTP w/R NP,ID=1.781'(01/05/16) 4 Ligi..c • 5-1/2'PORTED SEAL ASSY,ID=4.892' — 9031' * 9037' H 3"DEPLOYMENT SLV,0=1.920' Ni.;,.': I I 1111111 * 9070' —3-1/2"SEA LBORE SUB,D=2.813' 3-1/2"TE3G,9.2#,13CR-80 VAM TOP, — 9131' '•«. .0087 bpf,ID=2.992" - ----/ 2 , 9131' —3-1/2-WLEG,la=2.992- 7-5/8'X 5-1/2"2RH ZXP LTP w/1-ID,0=4.810" H 9131' 7-5/8'X 5-1/2'FLEX-LOCK FGR,D=4.80" — 9150' 5-1/2"SCAB LNR, 17#,L-80 Tal, H 9221' .0232 bpi,ID=4.892' TOP OF 4-1/2'LM — 9221' L 9221' —7-5/8"X 4-1/2'TW SS HOW FKR W sax*,TOP,ID=3.902' 7-5/8'CSG,29.7#, — 9316' NT-80CY HE NSCC,0=6,875" 14ILLOUT WINDOW(R-39A L1)-9561'--9570' 3-1/2'X 4-I/?TT W1PSTOCK(08/02/15) — 9561' 10682' —PUP ST w/RA TAG PERFORATION SUPAVARY REF LOG:NA eel . ANGLE AT TOP FW:67'@ 9295' "Wet Note:Refer to Production DB for historical perf data lie.4:. vat SIZE SW INTERVAL Opn/Sqz SHOT SQZ .I.0 A 0•,.,..... er'ititix..„ 2-3/8"TOC — -9777 1144-414#1QP- 4-1/2" SLTD 9296- 10352 SLOT 06/06/95 lelface ;ale. 2-7/8' SLTD 10303- 10748 SLOT 06/24/96 108/14/15) -04 ci a 1 ke t• FBID(PER LIPP TAG)(08/15/15) I— 12025' R-39A L1 1.56' 6 10390- 10530 0 08/16/15 L. 2-3/8'LM,4.7#, — 12072' 1.56" 6 11108-11333 0 08/16/15 13-CR 1H511, 1.56' 6 11910- 11950 0 08/16/15 '.0039 bpf,13=1.995" 10303' —BKR RRVV/GS RS1-*'t3 PROFILE,ID=3.0' 4-1/2'SLTD LNR, 12.8#,13CR-80 NSCT, 10388' .0152 bpf,ID=3.953' 2-7/8"SLTD LKR,6.16#,L-80 FL4S, — 10748' I 11. .00579 bpf,ID=2441" R-3 9A DATE REV BY COMANTS DATE REV BY COMENTS PRUDHOE BAY LNT 06/09/95 POOL 7 INITIAL COMPLETION 08/27/15 TR/JM) CORRECTED WSIMOW DEFTFI WELL R-39A/Li 06/25/96 ? CTD SIDETRACK(R-39A) 09/09/15 JMGIJMD GLV C/O(09/02/15) PERMT ND: 1960840, '2150920 06/17/15 D-16 'PRO 01/13/16 MGS/JAK.SET LTF'&CLOSED SLD SLV(1/5/16) AR No: 50-029-22526-01(60) 08/17/15 NORDIC1 CTD ML(R-39A L1) SEC 32,T12N,R13E,623'FSL&897'RAI 08/18115 JMD DRLG HO CORRECTIONS 08/25/15 AB/JM) ANAL ODE APPROVAL BP Exploration(Alaska) , 0 ac a r�/�1 W _� o Y > Y/ (.9 N Z X N a) f6 O O °�m 0 a co Q a) a, 0 9 � ori v = s • 00 _Y T r • Y O a ro -n > E �% O m c O c O m N ra >-...0 Q cro 0 '''t .. La N 11') N N 1n in u-) ill LAr to r r r N N to r0 O a) L m J Q (.9r y u +, N +-' to • ~ O a c c > > c m C c m m m a c = L c c rO N ~ N N CO N n N I- co N .'- a) >• a) h Z Q C p Q _ Q 4 CI Q' Ov v a) Ou K ~ v > S "a ra 7 al } m O C] p p p p p p p p p p p p o O ro a) C -c 6 W; J J J J J J J J J J J J J J J s }} W W LL LL LL w LL LL W LL LL LL LL LL LL to c o 0 0 F-'; lL LL U- LL U- LL U- LL U- U- LL LL LL LL LL 7 a) E 0 .1 J J J J J J J J J J J J J J J CU O 0v CI) Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q0 cN- G 6) a z ZZZZZ ZZZZZZZZZ v um p u O C) LL LL LL LL LL LL LL LL LL LL U- LL U- U- LL a) L - U aJ O E ro Y > Y U o z a v -0 '—' = 0 0. O O O O O O Q r' c o ' � 0 �' p O p p p 00 � I— Q a s u > • L o p D 0 0 0 0 0 O LL O m > > 2J O I. u. oLb m CO CO CO CO a' LL C] LY V CL CL 0 m, - I- I- I- I- I- I- J d W U) V) co J Ll t) .ti• t) Z Z Z Z Z O p = E. 0 4) g. 2 LL w w wW W O EE I W 020 > w w w w w w I- a xi V V] =. 000000 Ly LL -`,--•.) O 03 N• a I ri C c4 O ...0 r 0 >- >- >- >- >- >.. > O , rWte wcerecertrececece e...., osm > a. JOOOOO OOOOJJJJJ � MWLWWWWWWWLL1/4 :NI IJ in ..fs...ippillf")._..."1" --.1 >- >- r >- r >- rrr >- >- rYr -� 2 m m CO COQ0QO m COQm CO CO CO COQm m m 2 Q W LL LL W LL W tilLL W W LL LL W LL LU 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z p = 2 2 x 2 2 2 2 2 2 2 2 2 2 2 _r 0 0 0 0 0 0 0 00 0 0 0 00 0 cu LL LY W CLX CLX LY LY LY = LY CLCLCLLY 4 V O. a a a a a a a a a a a a a a c gm m r CC x N 1.4 waO M N. Cr in v 0 v a) a) 00 CO 0 )n 0 uj :'7 ,s0 0 rn 0 r- 0 a) to op cc co 00 In co N N- 03 0. co . ,� C 0 •L- •- 0 0 0 O a- 0 0 N 0 �. O O 00000000000. 0000 O L) fV0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a-, id p S p 2 2 U 2 U p 2 p N U N cx'1 = �` Gp > O co U) co CO U) cc U) U) CO 0 •Lb n Lb C 4 til CI } > > X > X > } co Al CO OL y �� w C.) 0 U0UU 000000000 (15 0LA 00 a a o in o 0 O 0 0 0 0 LL 0 0 0 0 11111111111111 0 0 0 0 0 0 0 0 0 0 O &' h -_ CO 03 N CO CO CO O O CO �'co cQ !■Y■ 7 0 O LO V' 03 0 LO M M N rn CO M C) M n cn CO V 01 in in up co r N. O N 0 0 M N M M Al 0 0 }, > N a. N N N N N N N N N N N N N N N El n < O O C) C) O C) 6 Q) C) O) O C) C) 6) 6 E c N NNNN NNN N N NNNN C 0 01 O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 ro C N 1n 1n in N In 1n in in in in rn N In in N a+ CO C a -a w 030.1 �ix g E u c E o 8 Lu .m o m U O Q m r r` Q Q Q Q Q N N Q V o m a, c N hv0 M Z, O M M 7 M N O N N O 'Cr V M O N E N N m yr -, CC a Q �° N o 0 0 m C7 .,_° Cr Ln O Z ar v v snow Li/. rn p C/.f L 1 F- CL CL ° CO REctiv It') STATE OF ALASKA 1ASKA OIL AND GAS CONSERVATION COMM! N IU 1 3 2015 REPORT OF SUNDRY WELL OPERATI. ..S 1. Operations Performedr'+� GCc Abandon 0 Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing El Operations shu dowwn0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing II Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well ❑ Other:Scab Liner 21 2. Operator Name: BP Exploration(Alaska),Inc 4 Well Class Before Work 5. Permit to Drill Number: 196-084 3. Address: P.O.Box 196612 Anchorage, Development 171 Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service ❑ 6 API Number: 50-029-22526-01-00 7. Property Designation(Lease Number): ADL 028279&028282 8 Well Name and Number: PBU R-39A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: RBL PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 10748 feet Plugs measured None feet true vertical 8900 feet Junk measured None feet Effective Depth. measured 10748 feet Packer measured 8907 feet true vertical 8900 feet Packer true vertical 8511 feet Casing. Length: Size: MD: TVD: Burst Collapse: Structural See Attachment Conductor Surface Intermediate Production Liner pp ��yy Perforation Depth: Measured depth: 9295-10352 feet 10352-10748 feet SCOWIE�s True vertical depth: 8732-8818 feet 8818-8900 feet Tubing(size,grade,measured and true vertical depth) 3-1/2"9.2#13Cr80 9131' 8661' Packers and SSSV(type,measured and 3-1/2"HES TNT Packer 8907' 8511' true vertical depth) 12 Stimulation or cement squeeze summary: Cut&Pull 4-1/2",12.6#NT13Cr80 Tubing from 8926',Mill and Pull Packer and Tubing from 9030',Run 5-1/2",17# L-80 Lower Scab Liner from 9131'-9221',Cut&Pull 7-5/8",29.7#,NT-80 Casing from 1975',Run 7-5/8",29.7#,L- Intervals treated(measured): 80 x 5-1/2",17#,L-80 Scab Liner to 9131',Cement 5-1/2"Scab Liner w/272 Bbls,Yield 1 31(1166 sx)Class'G', Cut&Pull 7-5/8",29.7#x 5-1/2",17#,L-80 Scab Liner from 440',Run 7-5/8",29 7#x 5-1/2",17#,L-80 Tie-Back to 454',Cement 7-5/8'x 5-1/2"Tie-Back w/60 Bbls,Yield 1.17(288 sx)Class'G',Run 3-1/2",9 2#,13Cr80 Tubing to 4141' Treatment descriptions including volumes used and final pressure' 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 280 160 Subsequent to operation: 0 0 0 0 0 14.Attachments:(required per 20 nnc 25 070 25 071,&25 283) 15.Well Class after work' Daily Report of Well Operations ® Exploratory ❑ Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil 21 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP ❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C.O.Exempt: 315-036 Contact Bolen,J.e.b Email J e.b.Bolen@bp.com Printed Name Joe Lastufka , Title Drilling Technologist Signature �,� , Phone +1907-564-4091 Date-7/1/I5 c�V Form 10-404 Revised 5/2015 V� L�i/>< 5— Suit Original Only .* 9.7. RBDMS_* Jt!! 1 7 2015 a) Q o O O O O O O O CD CD c0 N- MOO) a0a0a0Oa0Ln N- ti N N N N O c- CO 0 0 N- CO O U y 0 0 0 0 0 0 0 0 CD CD i O CO O7 O 't t M _ 7 LC) CO CO N- N- N- V M O m d' CO CO N- N N CO c- CD O dr CO O O CO V O Lo 0 O c- O 0 N CO CO co co co co I I I " I I- ('4 = CD O N- CD O CO O Nr r O CO � Ln CO N- 00 M d CO CD 00 4-0 Q) 00 0 E — M N M • M E • N O) O 0') d7 () p 03 ,, I ' I " " ' a.+ Q < C5) M V C) O M C in ) N O M • N O O c- • LL S▪ IM = ca 0 O O O O a O CO 0. co O O O " 00 Cp • F- ' 0cocoU I U = Z Z J J J J cn J M N In L6C) N N- N- lt A 'y ai ,- � ry OD y- V 6 N - cv CO U O) - N N N N - O N. 0 ON O LY Lf) Ln t.C) N N L Cn • O N ti - COCO a7 a) d) J W CC ~ co O Q DC OC OC OC U) W 'N O Q WW ZZZZ D _ _ _ _ CD U U IL Ct m m m m Ct CC Z Z c W < < < < W W m O D H U U U U Z ZD O U /) H R-39A, Well History (Pre-Rig Workover) T/I/O=SSV/250/0, Temp=SI. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO. PPPOT-T: Stung into test port(1800 psi), bled to 0 psi. Functioned LDS, all moved freely. Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 200 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port(300 psi), bled to 0 psi. Functioned LDS, all moved freely. Pumped through void, good returns. Pressured void to 3500 psi 2/19/2015 for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. 4/9/2015 EQUALIZE & PULL PLUG FROM 8970' SLM, 9007' MD. CTU-6 1.75" CT. Job Scope: Drift Dummy WS, Caliper Liner. MIRU. MU BKR dmy WS drift assy 2.68"x18.17' & RIH. Load well w/205bbls of seawater w/safelube followed by a 35bbls of 50/50 methanol FP. Drift down to 10,000'with no issues. POOH. MU PDS GR/CCL w/40-arm caliper& RIH to 9820'. Log at 50fpm from 9800' up to 8900'. POOH. Confirm good data (tied-in to June-7- 4/14/2015 1995 tubing tally). RDMO. DRIFT W/3.0" CENT, 2-1/2" SAMPLE BAILER. STOPPED DUE TO DEVIATION @ 9,269' SLM LOC.TT @ 9,020'SLM +4' CORRECTION TO ELM. PERFORM SBHPS W/TEL AS PER PROGRAM(good data). LRS LOAD TUBING W/ 175 bbls CRUDE. SET 4 1/2"XX- PLUG (24" OAL LOCK OPEN, (8) 3/16 PORTS) @ 8972' SLM/9007'MD. LRS MIT-T TO 2500 PSI PASS. 4/24/2015 BRUSHED FOR RESTRICTIONS @ 271' SLM, 6,635' SLM. T/I/0= 13/193/273 Temp= S/I Assist S-Line (RWO EXPENSE) MIT-T to 2500 psi ****PASSED**** Pumped 2 bbls of meth spear followed by 175 bbls of 92*F crude down TBG to load. Pumped 8 bbls of crude to reach test pressure of 2500 psi. TBG lost 121 psi in 1st 15 min and 40 psi in 2nd 15 min fora total loss of 161 psi in 30 min test, Bleed back 1.5 bbls crude, FWHP= 500/193/301 Tags hung on well, WV= Closed, SW, MV, SSV= Open, IA& OA= OTG, SSL in 4/24/2015 control of well on departure INITIAL T/I/O =450/275/300. CORRELATE TO TUBING TALLY DATED 07-JUNE-1995. CUT TBG W/3.65" JET CUTTER. CUT DEPTH = 8926'; CCL TO CUTTER ME = 16.2'; CCL STOP DEPTH = 8909.8'. POOR INDICATION OF CUT. PUMP DOWN TUBING. GOOD INDICATION OF TxIA 4/25/2015 COMMUNICATION. FINAL T/I/O = 200/275/300. T/I/0= 190/190/2 Temp=S/I Circ Out(RWO EXPENSE) Pumped 5 bbls 50*60/40 followed by 94 5/3/2015 bbls 1% KCL, 100 bbls 80* Brine down IA taking returns up TBG down FL. Temp= S/I Circ Out (RWO EXPENSE) Pumped 286 bbls 80* Brine (total of 386 bbls brine) followed with 21 bbls Diesel down IA taking returns up TBG down FL, U tube for 20 min, Pumped 4 bbls 50*60/40 up FL for FP, Bleed IA& OA pressures, FWHP's 0/0/0 AFE sign and tags hung on 5/4/2015 tree, Black lock reapplied to closed WV, WV, SV, SSV, AL= Closed MV= Open IA& OA= OTG. T/I/0 = 140/140/0. Temp = SI. Cement balance and control lines (pre RWO). AL SI @ casing valve, ALP = 0 psi. Disconnected balanced and control lines. Pumped 3 gallons hydraulic fluid down each balance and control line to ensure clear lines followed by 1.25 gallons SqueezeCrete down each balance and control line. Used hydraulic hand pump to pump small amount of hydraulic fluid to 5/6/2015 clear jewelry of cement. SV, WV, SSV= C. MV= 0. IA, OA= OTG. 15:30 hrs. T/I/O = 62/52/270. Temp = SI. Pressure test control/balance lines to 3000 psi (Balance & Control lines Passed). (Pre Rig). Balance line =Vac. Control line=Vac. Celalr is full of fluid up to grating, called for vac truck to suck out cellar. Increased control line to 3004 psi using enerpac pump. Control line lost 44 psi in 5 min (PASS). Bled Control line to 0 psi. Pressured up Balance line to 3000 psi. Balance line lost 26 psi in 5 minutes (PASS). Bled balance line to 0 psi. Hung test tags on balance & control line jewelry. Final WHPs = 62/52/270. BL =Vac. CL =Vac. SV, SSV= C. 5/11/2015 WV= LOTO. MV= O. IA& OA= OTG. 05:00. R-39A, Well History (Pre-Rig Workover) T/I/O = 20/50/280. Temp = SI. Bleed IA& OA(Pre Rig). AL SI @ casing valve (0 psi). Initial IA FL = near surface. Initial OA FL= near surface. Bled the IAP from 50 psi to 3 psi before pressure stabilized (20 minutes, gas &fluid, 31 gallons). Bled the OAP from 280 psi to 180 psi before pressure stabilized (10 minutes, gas &fluid, -1 bbl). Monitored the WHP's for 30 minutes, the IAP increased 27 psi and the OAP increased 50 psi. FWP's =20/30230. SV, WV, SSV= C. MV= 0. 5/15/2015 IA, OA= OTG. 1440 hrs. T/I/0=110/110/200. Pre Doyon 16, Set 4" BPV#282, Installed Temp valves#86, #95, and#43 as 5/19/2015 dryhole and Piggybacks. Final WHP's BPV/0/200. Tree is fluid packed. North America-ALASKA-BP Page 1 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM 'Rig Release: Rig Contractor.DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations L_. . (hr) (usft) 5/22/2015 15:00 - 17:00 2.00 RIGD P PRE READY RIG FLOOR FOR LOWERING DERRICK. ! !-FINISH CLEANING PITS. � -LOWER CATTLE SHUTE. r : _ -READY RIG FLOOR. 0 - 18:00 I 1.00 RIGD P PRE 17:00 j MOVE OFF OF N-17. -LOWER DERRICK. -PULL OFF OF N-17 AND STAGE RIG ON j N-PAD. 18:00 - 19:30 1.50 j RIGD P PRE REMOVE BOPE FROM CELLAR. 1 -REMOVE BOPE FROM CELLAR AND SECURE 1 ON CRADLE. -INSTALL REAR BOOSTER WHEELS AND _i_ FUNCTION TEST BOOSTER WHEELS. 19 30 - 00:00 4.50 RIGD N IWAIT PRE WAIT ON TOOL SERVICES TO STAGE MATS I 1 ON ROAD. "SIMOPS:COMPLETE MAINTENANCE ITEMS ON RIG. 5/23/2015 00:00 - 02:00 I 2.00 RIGD N WAIT PRE WAIT ON TOOL SERVICES TO STAGE MATS ON ROAD. 02:00 - 07:30 5.50 MOB P PRE MOVE RIG TO R-PAD ' -MATS ARE STAGED ON ROAD. -PRE-JOB WITH SECURITY AND DOYON. -MOVE RIG FROM N-PAD TO R-PAD. 07:30 - 08:30 1.00 MOB P PRE SET UP TO SPOT RIG. -REMOVE REAR BOOSTERS. ' -SET MAT AND EQUIPMENT AROUND I ' WELLHEAD. i 08:30 - 09:30 1.00 MOB P PRE RAISE DERRICK AND SECURE 109:30 - 12:00 2.50 MOB P j PRE SPOT RIG OVER WELL 12:00 - 15:00 3.00 1 MOB i P PRE RIG UP -SHIM AND LEVEL RIG OVER R-39A. -SPOT FUEL AND CREW TRAILERS. , -INSTALL DRAG CHAIN. -SECURE RIG FLOOR. -RAISE CATTLE CHUTE. I -BRIDLE UP TOP DRIVE AND SECURE DERRICK. -SPOT FLOWBACK TANK. I -RIG UP CELLAR MANIFOLD AND ' CIRCULATION LINES TO HARD LINE AND FLOWBACK TANK. -PRESSURE TEST CIRCULATION LINES TO 250 PSI/3500 PSI FOR 5 MINUTES EACH. ""ACCEPT RIG AT 15:00 HRS 15:00 - 18:30 3.50 MOB P PRE TAKE ON 290 BBLS OF 9.0 BRINE. -LAY MATS AROUND RIG. ' -SPOT#2 MUD PUMP. — -SPOT SLOP TANK ,18:30 - 19:30 , 1.00 MOB P I PRE CONDUCT RIG EVACUATION/GAS DRILL FOLLOWED BYAAR. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 2 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) (usft) 19:30 22:30 3.00 DHB P PRE PULL TWO WAY CHECK VALVE. '-PJSM. -RIG UP DRILL SITE MAINTENANCE LUBRICATOR. -PRESSURE TEST LUBRICATOR TO 250 PSI/3500 PSI. -PULL TWO WAY CHECK. '-INITIAL TUBING PRESSURE=47 PSI. -RIG DOWN AND STAND BACK DRILL SITE !MAINTENANCE LUBRICATOR. 22.30 - 00:00 1.50 CONDHL P PRE I CIRCULATE OUT FREEZE PROTECT. 1-PJSM. WSL AND TOUR PUSHER WALK THRU WITH HANDS ON VALVE LINEUP. 1-REVIEW PRESSURE CROSSCHECKLIST. REVERSE CIRCULATE 14 BBLS DOWN THE IA TAKING RETURNS THRU TUBING OUT TO FLOWBACK TANK. -PUMP AT 4 BBLS/MIN @ 1200 PSI. -RETURNS WERE CLEAN AT 14 BBLS. 1-CIRCULATE 50 BBLS DOWN THE TUBING TAKING RETURNS THRU THE IA OUT TO THE FLOWBACK TANK. .-PUMP AT 4 BBLS/MIN @ 1500 PSI. -RETURNS WERE CLEAN AT 45 BBLS. PUMPED AN EXTRA 5 BBLS TO CLEAR DIESEL FROM HARDLINE TO FLOWBACK TANK 5/24/2015 00.00 - 02'30 2.50 , CONDHL P I PRE I CIRCULATE WELL SURFACE TO SURFACE. '-RIG UP TO CIRCULATE BACK TO THE PIT !SYSTEM. -CIRCULATE 350 BBLS(FIRST 50 BBLS WERE ALREADY PUMPED)FROM SURFACE TO !SURFACE BACK TO THE PITS. -RETURNS WERE CLEAN. i -PUMP AT 4 BBLS/MIN @ 1400-1800 PSI. -17 BBLS LOST WHILE CIRCULATING WITH LOSS RATE AT 9 BBUHR WHILE PUMPING. '-FLOWCHECK WELL FOR 15 MINUTES-WELL ON LOSSES. -ESTABLISH STATIC LOSS RATE OF 4 BBLS/HR -MUD WEIGHT IN/OUT 9.0 PPG @ 02:30 HRS. 02:30 - 03 00 0.50 CONDHL P PRE BLOW DOWN AND RIG DOWN KILL MANIFOLD. -RIG UP 2ND KILL LINE FROM IA TO PITS. -RIG UP TO FEED AND MONITOR WELL FROM IA. 03'00 - 04 00 1.00 DHB P PRE RIG UP DRILL SITE MAINTENANCE LUBRICATOR -TEST QUICK TEST SUB TO 250/3500 PSI. -SET TWO WAY CHECK VALVE. 04 00 - 05:30 1.50 DHB P PRE TEST TWO WAY CHECK VALVE. PERFORMED ROLLING TEST ON TWO WAY • CHECK VALVE FROM BELOW FOR 10 MINUTES.CONFIRMED NO FLOW INTO THE 'TREE. -TEST TWO WAY CHECK VALVE FROM ABOVE TO 250 LOW/3500 PSI HIGH. -RIG DOWN DRILL SITE MAINTENANCE LUBRICATOR. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 3 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140.000.00) — — — Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO©45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — (usft) 05:30 - 07:30 2.00 BOPSUR P PRE NIPPLE DOWN DRY-HOLE TREE. -DRAIN TREE. •-FMC BLEED VOID. • •-NIPPLE DOWN DRY HOLE TREE AND Ii ADAPTER. -REMOVE TREE AND ADAPTER FROM I CELLAR. 07:30 - 08:30 1.00 BOPSUR P I • PRE TERMINATE CONTROL LINES. -FMC CLEAN AND INSPECT HANGER ' THREADS. -SCREWED CROSSOVER INTO HANGER-7.25 TURNS WITH 4.5"NSCT CROSSOVER. -FMC TERMINATE CONTROL LINES. 08:30 - 10:00 1.50 BOPSUR P % PRE I NIPPLE UP BOPE. -NM BOPE. li I -CHANGE OUT BOOTS ON RISER. • 10:00 - 11:30 1.50 BOPSUR P PRE r-INSTALL RISER.:RIG UP TO TEST BOPS. -RIG UP TESTING EQUIPMENT. FUNCTION TEST RAMS. I -FILL BOP WITH FLUID. -SHELL TEST BOPE TO 3500 PSI-PASSED. 11:30 - 16:30 5.00 BOPSUR i P PRE 4 TEST BOPE T/250PSI LOW AND 3500PSI HIGH,F/5 CHARTED MINS EACH(ANNULAR FAILED,OTHERWISE EVERYTHING ELSE I PASSED) —UTILIZE 2-7/8",4.5",AND 4"TEST JNTS. • ' -TEST(2)TIW VALVES,(1)4"DART VALVE. -PERFORM ACCUMULATOR DRAW DOWN TEST. • AOGCC REP JOHN CRISP WAIVED TEST WITNESS **WELL STILL TAKING 5 BBLS/HOUR LOSSES MUD WT IN 9.0 PPG **LOSSES TO WELL FROM MIDNIGHT TO NOON=29 BBLS. 16:30 - 17:30 1.00 j BOPSUR P ' PRE PREP FOR ANNULAR CHANGEOUT • :-RIG DOWN TEST EQUIPMENT -BLOW DOWN ALL SURFACE LINES. • -DRAIN BOP STACK. •-RIG UP TONGS. 17:30 - 18:30 i 1.00 BOPSUR N RREP -15.21 PRE RIG UP TO CHANGE ANNULAR. I -PULL MOUSE HOLE&RISER. -REMOVE TURNBUCKLES,KOOMEY LINES& HOLE FILL LINE FROM BOP STACK. -CLOSE BLIND RAMS. -MOBILIZE ANNULAR CHANGING TOOLS TO FLOOR AND CELLAR. *WELL STILL TAKING 5 BBLS/HR LOSSES 18:30 - 22:30 4.00 i BOPSUR N I RREP ' -15.21 PRE CHANGE OUT ANNULAR PREVENTER • ELEMENT. -PULL OLD ANNULAR ELEMENT. -INSTALL NEW ANNULAR ELEMENT. • -NIPPLE UP RISER AND INSTALL MOUSEHOLE. -INSTALL HOLE FILL LINES,TURNBUCKLES AND KOOMEY LINES. *WELL STILL TAKING 5 BBLS/HR LOSSES Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 4 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO(§)45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _' (usft) 22:30 23:00 0.50 BOPSUR N RREP - - - -15.21 PRE RIG UP TO TEST ANNULAR. -FILL BOP STACK WITH WATER. -FUNCTION ANNULAR ELEMENT SEVERAL TIMES. -RIG UP TEST EQUIPMENT. 23:00 - 23:30 0.50 BOPSUR P PRE TEST ANNULAR PREVENTOR. -TEST ANNULAR PREVENTER WITH 2-7/8" TEST JOINT TO 250/3500 PSI FOR 5 MINUTES EACH. 123:30 - 00:00 0.50 i BOPSUR P PRE RIG DOWN TEST EQUIPMENT. -BLOW DOWN ALL LINES. -CLEAN AND CLEAR RIG FLOOR. *WELL STILL TAKING 5 BBLS/HR LOSSES **LOSSES TO WELL FROM NOON TO MIDNIGHT=41 BBLS 5/25/2015 '00:00 - 02:00 2.00 BOPSUR P PRE PULL TWO WAY CHECK VALVE. -RIG UP DUTCH RISER. -TEST DSM LUBRICATOR TO 250/3500 PSI. -PULL TWO WAY CHECK VALVE. -RIG DOWN DSM LUBRICATOR. i I i *WELL STILL TAKING 5 BBLS/HR LOSSES 102:00 - 03:00 1.00 PULL P DECOMP PULL HANGER TO FLOOR. -MAKE UP LANDING JOINT TO CROSSOVER (7.25 TURNS)AND TOP DRIVE. -FMC BACKED OUT LOCK DOWN SCREWS AND VERIFIED LENGTHS OF LDS. -PULL HANGER TO FLOOR AT 140K PUW, 131K SOW. 103:00 - 04:00 1.00 PULL P DECOMP CIRCULATE WELL. -CLOSE ANNULAR PREVENTER AND LINED RETURNS THRU CHOKE LINE INTO CHOKE MANIFOLD THRU SUPERCHOKE. -CIRCULATE BOTTOMS UP(234 BBLS)AT 6 BBLS/MIN @ 350 PSI. -3 BBLS LOST WHILE CIRCULATING. *WELL STATIC LOSS RATE INCREASED TO 6 BBLS/HR. 04:00 - 04:30 0.50 i PULL P I DECOMP RIG UP TO DECOMPLETE TUBING. -RIG UP CAMCO SPOOLER. -RIG UP 4.5"TUBULAR HANDLING EQUIPMENT. -LAY DOWN HANGER AND LANDING JOINT. 04:30 - 11:00 6.50 PULL 1 P DECOMP DECOMPLETE WELL. -PULL 4.5"NSCT 13CR80 TUBING FROM WELL AND LAY DOWN. 1 -PULL CONTROL LINE AND SPOOL ON SPOOLING UNIT.TOTAL OF 57 BANDS RECOVERED. -PULL AND LAY DOWN TUBING FROM 8,926' TO 4,700' *WELL ON 3-5 BBL/HR LOSSES. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 5 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date 6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:0-16 RWO©45.09usft(above Mean Sea Level) Date I From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:30 1.50 PULL P DECOMP WELL STOPPED TAKING LOSSES. -FLOWCHECKED WELL FOR 10 MINUTES-WELL WAS STATIC. -CLOSED ANNULAR AND CIRCULATED 2 BOTTOMS UP THRU GAS BUSTER. -CIRCULATE AT 6 BBUMIN AT 420 PSI. -NO SIGNS OF GAS. -FLOWCHECK WELL-WELL ON LOSSES. -LINED UP WELL TO TRIP TANK AND MONITOR FOR LOSSES-WELL ON 3.2 BBUHR LOSSES. TOTAL LOSSES FROM MIDNIGHT TO NOON= 36 MUDWEIGHT IN/OUT=9.0/9.0 PPG©11:00 AM OA PRESSURE=120 PSI a 11:30 AM 12 30 - 17'00 4.50 PULL P DECOMP DECOMPLETE WELL. -PULL 4.5"NSCT 13CR80 TUBING FROM WELL AND LAY DOWN. -PULL AND LAY DOWN TUBING FROM 4,700' TO SURFACE. -WELL ON 3-5 BBL/HR LOSSES. I'CUT JOINT WAS 4.02'LONG WITH A 5"OD FLARE,BUT GOOD CUT. 17:00 - 18:30 1.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR. -MOBILIZE BAKER EQUIPMENT TO RIG ff FLOOR. 18:30 - 19:00 0.50 WHSUR P DECOMP INSTALL 8'-7/8"WEAR RING 19:00 - 20:30 1.50 PULL P DECOMP RIH WTH DRESS-OFF ASSEMBLY. -PJSM. -MAKE UP AND RUN IN HOLE WITH DRESS-OFF ASSEMBLY. -RUN IN HOLE WITH 9-4.75"DRILL COLLARS "PERFORM 0-1 KICK WHILE TRIPPING COMPLEX DRILL-SIMULATED FAILURE OF REMOTE BOP PANEL IN DOG-HOUSE.ALL HANDS RESPONDED IN GOOD TIME AND MANNER.HELD AAR AFTER THE DRILL. 20'30 - 00 00 3.50 PULL P DECOMP RUN IN HOLE WITH DRESS-OFF ASSEMBLY. -RUN IN HOLE WITH BHA ON 4"HT-38 DRILLPIPE FROM 308'TO 2456'. -PICK UP PIPE FROM PIPE SHED 1X1. TOTAL LOSSES FROM NOON TO MIDNIGHT= 38 MUDWEIGHT IN/OUT=9.0/9.0 PPG OA PRESSURE=180 PSI 5/26/2015 00:00 - 00:30 0.50 PULL P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00:30 - 08:30 8.00 FISH I P DECOMP RUN IN HOLE WITH DRESS-OFF ASSEMBLY I FROM 2,456'TO 8,900'MD. -RUN IN HOLE WITH BHA ON 4"HT-38 DRILLPIPE. -PICK UP PIPE FROM PIPE SHED 1X1. -ESTABLISH PARAMETERS:PUW=184 KLBS, SOW=156 KLBS,ROT.WT.=167 KLBS,FREE TORQUE=3 FT-KLBS,RPM=10-20,3 BPM= 180 PSI. -ACQUIRE SLOW CIRCULATING RATES. Printed 7/6/2015 10 59'02AM North America-ALASKA-BP Page 6 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud DateTme:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO©45.09usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations hr) (usft) • 08:30 - 09:30 r 1.00 FISH P DECOMP MILL AND POLISH 4-1/2"STUB AS PER BAKER ' REPRESENTATIVE. 09:30 - 10:30 1.00 FISH P DECOMP ENGAGE STUB PER BAKER. .-JAR(10)TIMES ON FISH. I-ROTATE FISH,ROTATE FREE. 10:30 - 12:00 1.50 + FISH P DECOMP CIRCULATE WELL BORE. I-CLOSE ANNULAR PREVENTOR. -PUMP 40 BBL SWEEP SURFACE TO SURFACE AT 5 BPM=480 PSI. I-SHUT DOWN AND MONITOR WELL FOR(10) MINUTES.LOSS RATE=3 BPH. FLUID LOSS TO WELL PAST(12)HOURS=33 BBLS 9.0 PPG BRINE. _ I OA=70 PSI. 12:00 - 12:30 0.50 FISH P DECOMP I PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS. I GOOD. BLOW DOWN TOP DRIVE AND CHOKE LINE. 12.30 - 17:00 4.50 FISH P DECOMP PJSM.POOH WITH DRESS-OFF ASSEMBLY. -POOH FROM 8,926'MD TO 308'MD. } MONITOR WELL FOR(10)MINUTES.LOSS — I !RATE=4 BPH. 17.00 - 19:30 2.50 FISH P DECOMP PJSM.UD DRESS-OFF ASSEMBLY. -STAND BACK DRILL COLLARS. BREAK DOWN BHA#1 AND K-ANCHOR FISH. 19:30 - 20:00 0.50 FISH P DECOMP CLEAR AND CLEAN RIG FLOOR. -LOAD AND INSPECT PACKER MILL BHA#2 INTO PIPE SHED. 20:00 - 20:30 0.50 FISH P DECOMP PJSM.M/U BAKER PACKER MILL BHA#2. T -RIH FROM SURFACE TO 319'MD. 20:30 00:00 3.50 FISH P DECOMP PJSM.RIH WITH BAKER PACKER MILL BHA#2. -RIH FROM 319'MD TO 7,712'MD.PUW=160 KLBS,SOW=145 KLBS. ! !FLUID LOSS TO WELL PAST(24)HOURS=44 BBLS 9.0 PPG BRINE. OA=70 PSI. 5/27/2015 100:00 - 00:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. 1 CROWN-0-MATIC AND SPCC CHECKS. GOOD. 00:30 - 01:00 0.50 FISH P DECOMP PJSM.RIH WITH BAKER PACKER MILL BHA#2. ' I -RIH FROM 7,712'MD TO 8,944'MD. 01:00 - 03:30 2.50 FISH P DECOMP PJSM.SLIP AND CUT DRILLING LINE. 03:30 - 07:00 3.50 FISH P ' DECOMP MILL ON PACKER AT 8,968'MD -ESTABLISH PARAMETERS:PUW=186 KLBS, SOW=158 KLBS,ROT.WT.=167 KLBS,FREE I TORQUE=4.5 FT-KLBS,RPM=10-20,5 BPM= ' 550 PSI. ACQUIRE SLOW CIRCULATING RATES. -MILL ON PACKER WITH 5-9 KLBS WOB. -WELL BEGAN LOSING FLUID. Printed 7/6/2015 10.59:02AM North America-ALASKA-BP Page 7 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO©45.09usft(above Mean Sea Level) _ -- Date From-To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) (usft) I --... 07:00 - 12:00 5.00 • FISH ' P DECOMP BULLHEAD 45 BBLS 9.0 PPG BRINE. -PUMP 145 BBLS 9.0 PPG HI-VIS BRINE. 1 -MONITOR WELL.LOSS RATE=120 BPH. ORDER OUT MORE FLUID TO CONTROL LOSS RATE. FLUID LOSS TO WELL PAST(12)HOURS=585 •BBLS 9.0 PPG BRINE. OA=70 PSI. 12:00 - 13'30 1.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS ' AROUND THE RIG. ! 1-CROWN-O-MATIC AND SPCC CHECKS. GOOD. 'PUMP SECOND 145 BBLS PILL OF 9.0 PPG HI-VIS WITH ANNULAR CLOSED AT 1 BPM=30 PSI. -TOP OFF PITS WITH FLUID. -MONITOR WELL.LOSS RATE=68 BPH. 13.30 - 15 00 1.50 FISH P DECOMP PJSM.MILL ON PACKER. -RIH AND TAG PACKER AT 8,971'MD. -ESTABLISH PARAMETERS:60 RPM,FREE TORQUE=4.5 FT-KLBS,PUW=168 KLBS, • 'SOW=156 KLBS,ROT.WT.=170 KLBS. 1-CONTINUE TO MILL PACKER FREE. 1 ! -PUSH PACKER TO NO-GO AT 9,159'MD. RECIPROCATE STINGER IN/OUT OF PACKER (4)TIMES. 15:00 - 16:30 1.50 FISH P ' DECOMP PUMP 290 BBLS 9.0 PPG BRINE. -PUMP 45 BBLS 9.0 PPG HI-VIS BRINE AT 5 BPM=800-1000 PSI. -ACQUIRE SLOW CIRCULATING RATES. '-MONITOR WELL.LOSS RATE=15 BPH. 16:30 - 21:00 4.50 FISH P DECOMP PJSM.POOH WITH BAKER PACKER MILL BHA 1 #2. -POOH FROM 9,159'MD TO 319'MD. -STAND BACK DRILL COLLARS. 21:00 - 23:30 2.50 FISH P DECOMP PJSM.UD BAKER PACKER MILL BHA#2. -POOH FROM 319'MD TO SURFACE. ' -RECOVERED 50 LBS METAL DEBRIS FROM ... BOOT BASKETS. i- 23:30 - 00:00 0.50 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#3. -RIH FROM SURFACE TO 1,538'MD.PUW=62 KLBS,SOW=70 KLBS. 1 FLUID LOSS TO WELL PAST(24)HOURS=805 BBLS 9.0 PPG BRINE. OA=45 PSI. 5/28/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00:30 - 04:30 4.00 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#3. -RIH FROM 1,538'MD TO 9,153'MD. I -ESTABLISH PARAMETERS:PUW=185 KLBS, SOW=148 KLBS. -ACQUIRE SLOW CIRCULATING RATES. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 8 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date 6/17/2015 X4-0115D-E (4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:0-16 RWO©45.09usft(above Mean Sea Level) Date From-To i Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 05:00 0.50 FISH P DECOMP ENGAGE PACKER WITH SPEAR AS PER BAKER REPRESENTATIVE. -PULL FREE AT 260 KLBS.PUW=210 KLBS, SOW=148 KLBS. I-MONITOR WELL FOR(10)MINUTES.LOSS RATE=16 BPH. 05:00 10:00 5.00 FISH P DECOMP PJSM.POOH WITH BAKER SPEAR BHA#3 LAND PACKER. -POOH FROM 9,153'MD TO 307 MD. 10:00 12:00 2.00 FISH P DECOMP 1 PJSM.UD BAKER SPEAR BHA#3 AND PACKER. I-POOH FROM 307'MD TO SURFACE. STAND BACK DRILL COLLARS. -USE TUBING PUNCH ABOVE AND BELOW PLUG ON 4-1/2"TUBING TAIL. I FLUID LOSS TO WELL PAST(12)HOURS=123 I BBLS 9.0 PPG BRINE. OA=45 PSI. 12.00 - 14 00 2.00 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. I PJSM.CLEAR AND CLEAN RIG FLOOR. I-R/U 2-7/8"HANDLING EQUIPMENT ON RIG FLOOR. 14:00 - 16.00 2.00 CLEAN P DECOMP I PJSM.M/U BAKER SCRAPER/DRIFT BHA#4 i W/20 JOINTS 2-7/8"HT PAC. RIH FROM SURFACE TO 946'MD. 16 00 - 20:00 4.00 CLEAN P DECOMP RIH WITH BAKER SCRAPER/DRIFT BHA#4 W/ 20 JOINTS 2-7/8"HT PAC. -RIH FROM 946'MD TO 9,206'MD.TAG TOP OF 4-1/2"LINER,PUW=185 KLBS,SOW=150 KLBS,ROT.WT.=170 KLBS,40 RPM=4-5 FT-KLBS TORQUE. ACQUIRE SLOW CIRCULATING RATES. 20 00 - 23:00 3.00 CLEAN P DECOMP WASH DOWN WITH BAKER SCRAPER/DRIFT :BHA#4. -WASH FROM 9,206'MD TO 9,805'MD. -PUMP AT 1-2 BPM=300-400 PSI.PUW=193 KLBS,SOW=155 KLBS. -TOOK WEIGHT AND HAD TO WORK THROUGH SEVERAL AREAS WHILE WASHING DOWN.COULD NOT WORK PAST 9,805'MD. ATTEMPTED TO WORK PAST 9,805'MD, UNSUCCESSFUL. -RECIPROCATE 7-5/8"SCRAPER ACROSS PACKER SET DEPTH.(9,162'MD TO 9,117' MD.) 2300 - 00 00 1.00 CLEAN P DECOMP POOH WITH BAKER SCRAPER/DRIFT BHA#4. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=13 BPH. -POOH FROM 9,805'MD TO 9,666'MD.PUW= 185 KLBS,SOW=150 KLBS.NO OVER PULL NOTED WHILE POOH. FLUID LOSS TO WELL PAST(24)HOURS=248 'BBLS 9.0 PPG BRINE. OA=0 PSI,OPEN TO FLOW BACK TANK. MONITORED EVERY HOUR.OA OPENED TO FLOW BACK TANK AT 21:00 HRS. Printed 7/6/2015 10 59 02A North America-ALASKA-BP Page 9 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO c45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/29/2015 00:00 - 00:30 0.50 CLEAN P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00 30 - 04:30 4.00 CLEAN P DECOMP 1 PJSM.POOH WITH BAKER SCRAPER/DRIFT BHA#4. -POOH FROM 9,666'MD TO 9,105'MD. -RUN BACK IN HOLE AND TAG TOP OF 4-1/2" LINER,TAG AT 9,203'MD.VERIFY TAG(2) 1 TIMES AT 9,203'MD. CONTINUE POOH FROM 9,202'MD TO 946' MD. 1-MONITOR WELL FOR(10)MINUTES.LOSS RATE=9 BPH. 04.30 - 06:30 2.00 CLEAN P DECOMP PJSM.UD BAKER SCRAPER/DRIFT BHA#4 AND 2-7/8"HT PAC. -UD 1X1 20 JOINTS OF 2-7/8"HT PAC TO PIPE SHED. -CLEAR AND CLEAN RIG FLOOR. F06:30 - 07:30 I 1.00 CLEAN P DECOMP R/D 2-7/8"HANDLING EQUIPMENT. -CLEAR AND CLEAN RIG FLOOR. 07:30 - 08:30 1.00 CASING P DECOMP PJSM.R/U 3-1/2"AND 5-1/2"HANDLING EQUIPMENT FOR SETTING RBP. 08:30 - 12:00 3.50 CASING P DECOMP PJSM.M/U 5-1/2"LOWER SCAB LINER. -BAKER-LOK AND TORQUE TURN 5-1/2"TO 5,500 FT-LBS. -M/U RBP AND SETTING TOOL. -SET 5-1/2"RBP AS PER BAKER REPRESENTATIVE,SET 30'IN ON FULL JOINT OF LOWER SCAB LINER. -L/D SETTING TOOLS,B/D TOP DRIVE. FLUID LOSS TO WELL PAST(12)HOURS=142 BBLS 9.0 PPG BRINE. C I OA=0 PSI,OPEN TO FLOW BACK TANK. MONITORED EVERY HOUR.OA OPENED TO FLOW BACK TANK AT � 005/28/15. 21.0 HRSON NO SLOW PUMP OPERATIONS THIS TOUR. 12:00 13:001.00 - -- � - - — _ — --- CASING P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.R/U TEST EQUIPMENT ON RIG FLOOR. -PRESSURE TEST RBP TO 3,000 PSI FOR(5) CHARTED MINUTES.GOOD TEST. -DUMP 6.75 SACKS OF SAND ON TOP OF RBP. 13.00 - 14:00 1.00 CASING P DECOMP M/U FLEX-LOCK LINER HANGER AND ZXP LINER TOP PACKER. -TORQUE TURN TO 5,500 FT-LBS. 14 00 - 21:30 7.50 1 CASING P DECOMP PJSM.RIH WITH LOWER SCAB LINER. -RIH FROM 104'MD TO 9,206'MD.PUW=194 KLBS,SOW=153 KLBS. -FILLING DRILL PIPE WITH FLUID EVER 5 STANDS. Printed 7/6/2015 10.59:02AM North America-ALASKA-BP Page 10 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor.DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO t45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 22:00 0.50 CASING P ! DECOMP PJSM.SET LINER HANGER AND LTP. RIH AND TAG TOP OF 4-1/2"LINER AT 9,206' I MD. -SET DOWN 5 KLBS TO VERIFY.CONTINUE TO SET DOWN 30 KLBS,NOTE SHEAR PINS '.. SHEAR AT 22 KLBS. I-PU TO 185 KLBS,PRESSURE UP TO 2,500 ' 'PSI TO SET HANGER. , -SLACK OFF 50 KLBS TO VERIFY SET. 1-PRESSURE UP TO 4,500 PSI,NOTE PUSHER ' SHEAR AT 4,200 PSI.HOLD 4,500 PSI FOR(5) MINUTES. I 1-BLEED OFF PRESSURE. -APPLY 25 RIGHT HAND TURNS TO RELEASE. ! '-PU TO CONFIRM RELEASE AND EXPOSE DOGS,SET DOWN 90 KLBS(2X)AND NOTE i DOGS SHEAR AT 105 KLBS. I 22:00 - 23:00 1.00 CASING -'F-' P j DECOMP 'CIRCULATE OUT 9.0 PPG HI-VIS FLUID AND 'DISPLACE WITH CLEAN 9.0 PPG BRINE. -ACQUIRE SLOW CIRCULATING RATES. -CIRCULATE 280 BBLS AT 8 BPM=1,050 PSI. MONITOR WELL.LOSS RATE=4 BPH. 23.00 - 00:00 1.00 —I- CASING P DECOMP I PJSM .POOH WITH LINER RUNNING `ASSEMBLY. -POOH FROM 9,206'MD TO 8,824'MD, i STANDING BACK IN DERRICK.PUW=182 � I KLBS,SOW=145 KLBS. 1 1 FLUID LOSS TO WELL PAST(24)HOURS=239 BBLS 9.0 PPG BRINE. OA=0 PSI,OPEN TO FLOW BACK TANK MONITORED EVERY HOUR.OA OPENED TO FLOW BACK TANK AT 21:00 HRS ON 05/28/15. 5/30/2015 0000 - 00 30 0.50 CASING P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS. l 1 +GOOD. 00 30 07:00 6.50 CASING P DECOMP 1PJSM.POOH WITH LINER RUNNING I ASSEMBLY. -POOH FROM 8,824'MD TO 6,455'MD, STANDING BACK(25)STANDS IN DERRICK -CONTINUE POOH FROM 6,455'MD L/D DP 1X1 TO SHED TO 1,684'MD. 07:00 - 08:00 1.00 CASING P DECOMP PERFORM D1 DRILL WITH AAR. -HAD D4 TABLE TOP DURING AAR WITH ALL 'CREW MEMBERS,WSL AND TOOL PUSHER. 08:00 - 09:30 1.50 CASING P DECOMP PJSM.POOH WITH LINER RUNNING ASSEMBLY. -POOH FROM 1,684'MD TO RUNNING TOOL. 09:30 - 10:30 1.00 CASING P DECOMP UD BOT RUNNING TOOL. -CLEAR AND CLEAN RIG FLOOR. 10:30 - 12:00 1.50 EVAL P i 1 DECOMP PJSM.R/U HES E-LINE TO LOG TOP OF I CEMENT. -RIH TO 2,500'MD. • FLUID LOSS TO WELL PAST(12)HOURS=31 BBLS 9.0 PPG BRINE. I OA=0 PSI,OPEN TO FLOW BACK TANK ' MONITORED EVERY HOUR.OA OPENED TO FLOW BACK TANK AT 21:00 HRS ON 05/28/15. NO SLOW PUMP OPERATIONS THIS TOUR. Printed 7/6/2015 10:59 02AM North America-ALASKA-BP Page 11 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4.140.000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date II From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ---+ L-- --- -- --- -- -__ . --_ - - - 12:00 - 14:00 2.00 EVAL P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. '-CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.LOG TOP OF CEMENT WITH HES E-LINE. -POOH FROM 2,500'MD,TOC=2,320'MD. 14:00 - 15:00 1.00 EVAL P DECOMP PJSM.R/D HES E-LINE EQUIPMENT. 1 -CLEAR AND CLEAN RIG FLOOR. 15:00 - 16:00 1.00 CUT P DECOMP PJSM.M/U BAKER MULTI-STRING BHA#5. -RIH FROM SURFACE TO 27'MD. �16:00 - 18:00 2.00 CUT P DECOMP RIH WITH BAKER MULIT-STRING BHA#5. -RIH FROM 27'MD TO 2,217'MD. 18:00 - 18:30 0.50 ' CUT P DECOMP CUT 7-5/8"CASING AT 2,217'MD. -GOOD INDICATION OF CUT,PRESSURE DROP OFF AND TORQUE FALL OFF. —; 1 18:30 - 20:30 2.00 CUT j P DECOMP ATTEMPT TO CIRCULATE OUT OA TO FLOW 1 BACK TANK. '-CLOSE ANNULAR AND PRESSURE UP TO 2,500 PSI.UNABLE TO CIRCULATE. -CONTACT ODE AND DECISION MADE TO PICKUP AND RE-CUT 7-5/8"CASING. 20:30 21:00 0.50 CUT P DECOMP 'POOH WITH BAKER MULTI-STRING CUTTER BHA#5. • _ POOH FROM 2,217'MD TO 1,975'MD. 21:00 - 21:30 0.50 CUT i P DECOMP CUT 7-5/8"CASING AT 1,975'MD. -GOOD INDICATION OF CUT,PRESSURE DROP OFF AND TORQUE FALL OFF. 21:30 23:30 2.00 CUT 1 P DECOMP CIRCULATE OUT OA TO FLOW BACK TANK. -CLOSE ANNULAR AND PRESSURE UP TO 2,500 PSI.HOLD PRESSURE AT 2,500 PSI, AFTER 5 MINUTES PRESSURE DROP OFF I AND CIRCULATION ESTABLISHED. -PUMP 40 BBLS DEEP CLEAN PILL AT 2 BPM= • 120 PSI. PUMP 160 BBLS 9.0 PPG BRINE AT 4 BPM= 200 PSI. -ACQUIRE SLOW CIRCULATING RATES. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=4 BPH. 123:30 - 00:00 0.50 CUT P DECOMP PJSM.POOH WITH BAKER MULTI-STRING CUTTER BHA#5. -POOH FROM 1,975'MD TO 1,887'MD.PUW= 72 KLBS,SOW=72 KLBS. -UD DRILL PIPE 1X1 TO PIPE SHED. FLUID LOSS TO WELL PAST(24)HOURS=140 BBLS 9.0 PPG BRINE. 5/31/2015 100:00 - 00:30 0.50 1 CUT P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS 'AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00.30 - 02:00 1.50 CUT P I DECOMP 'PJSM.POOH WITH BAKER MULTI-STRING CUTTER BHA#5. -POOH FROM 1,887'MD TO 27'MD. -UD DRILL PIPE 1X1 TO PIPE SHED. L -MONITOR WELL.LOSS RATE=4 BPH. 02:00 - 02:30 0.50 CUT P ' DECOMP UD BAKER MULTI-STRING CUTTER BHA#5. -POOH FROM 27'MD TO SURFACE. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 12 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/me:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO(d345.09usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations • (hr) ' (usft) 02:30 - 03:00 0.50 CUT P DECOMP CLEAR AND CLEAN RIG FLOOR. 03:00 - 05:00 2.00 CUT 1 P DECOMP RIH WITH(6)STAND FROM DERRICK I-SLIP AND CUT DRILLING LINE. -_ POOH AND UD 1X1 TO PIPE SHED. jr- 05:00 - 06:30 1.50 BOPSUR P DECOMP DRAIN BOPE STACK. 1I-R/U SECONDARY KILL LINE. I I i.-PULL WEAR RING,SET TEST PLUG RILDS. 06:30 - 08:00 1.50 BOPSUR ; P DECOMP I PJSM.CHANGE OUT UPPER PIPE RAMS TO 7-5/8"FIXED RAMS. 08:00 - 10:30 2.50 BOPSUR P DECOMP PJSM.R/U PRESSURE TESTING EQUIPMENT TO TEST FOUR PREVENTER 13-5/8"BOPE. PERFORM BOPE BODY TEST. -CHANGE OUT UPPER RAM DOOR SEALS. } I PERFORM DERRICK INSPECTION. 10:30 - 17:00 1 6.50 BOPSUR Pr DECOMP i PJSM.TEST FOUR PREVENTER 13-5/8"BOPE 1 !AND RELATED EQUIPMENT. TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 2-7/8"TEST JOINT TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. j-TEST UPPER 7-5/8"FIXED RAMS WITH 7-5/8" ;TEST JOINT TO 250 PSI,3,500 PSI HIGH FOR 5 'CHARTED MINUTES. -TEST LOWER 2-7/8 x 5"VARIABLE RAMS WITH 2-7/8"AND 3-1/2"TEST JOINT TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED !MINUTES. '-TEST BLIND RAMS,FLOOR VALVES,AND ' CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. I-PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. NO FAILURES. -LOUIS GRIMALDI OF AOGCC WAIVED WITNESS TO BOPE TEST. I-R/D TEST EQUIPMENT,BLOW DOWN SURFACE LINES,RETRIEVE TEST PLUG. 17:00 - 17:30 0.50 CASING P DECOMP R/U 7-5/8"HANDLING EQUIPMENT AND POWER TONGS TO RIG FLOOR. 17:30 - 18:00 0.50 CASING P DECOMP PJSM.M/U BAKER SPEAR BHA#6. • -RIH AND SPEAR 7-5/8"HANGER. I,18:00 - 18:30 0.50 , CASING P DECOMP SPEAR AND PULL 7-5/8"HANGER. -FMC BLEED VOID AND BOLDS. -PULL CASING FREE AT 110 KLBS,PUW=93 KLBS,SOW=93 KLBS. 18.30 - 19:00 I 0.50 CASING P DECOMP CIRCULATE OA TO FLOW BACK TANK CNULAALA0 S 9.0 PPGLOSE BARN TAKINGRND RETCIRCUURNS TOTE13FLOBBLW BACK TANK. -ACQUIRE SLOW CIRCULATING RATES. 19.00 - 19:30 0.50 • CASING • P ' DECOMP UD BAKER SPEAR BHA#6. - + -UD HANGER AND SPEAR ASSEMBLY. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 13 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-01150-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO©45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 22:30 1 3.00 CASING P DECOMP PJSM.POOH AND UD 7-5/8"29.7#NT-80 NSCC CASING. -POOH FROM 1,975'MD TO SURFACE. -TORQUE REQUIRED TO BREAK OUT=20 FT-KLBS. -RECOVERED:(47)FULL JOINTS,(1)CUT JOINT=11.94'WITH 8-9/16"FLARE. 22:30 - 23:30 1.00 CASING P DECOMP DRAIN BOPE STACK. -SET TEST PLUG,RILDS. -CLEAN AND CLEAR RIG FLOOR. 23:30 - 00:00 0.50 BOPSUR P DECOMP PJSM.CHANGE OUT UPPER 7-5/8"FIXED TO 3-1/2"X 6"VBR. -BLEED DOWN ACCUMULATOR LINES. FLUID LOSS TO WELL PAST(24)HOURS=44 BBLS 9.0 PPG BRINE. 6/1/2015 00:00 - 03:00 3.00 BOPSUR P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.CONTINUE TO CHANGE OUT UPPER PIPE RAMS TO 3-1/2"X 6"VBR. -R/U TEST EQUIPMENT AND PRESSURE TEST UPPER RAMS WITH 3-1/2"AND 5-1/2" TEST JOINTS TO 250 PSI LOW,3,500 PSI _ •HIGH.GOOD TEST. 03:00 - 03:30 0.50 BOPSUR P j DECOMP R/D TEST EQUIPMENT. -PULL TEST PLUG. 03:30 12:00 8.50 CASING P DECOMP PJSM.RIH WITH 5-1/2"17#L-80 TC-II LINER I TIE-BACK. j ! BAKER-LOC SEAL PORT ASSEMBLY AND FIRST(3)CONNECTIONS. USE JET LUBE SEAL GUARD ON ALL TC-II CONNECTIONS. -USE TORQUE TURN SERVICES TORQUING EACH CONNECTION TO 5,500 FT-LBS. -FILL CASING WITH 9.0 PPG BRINE EVERY 5 JOINTS. -INSTALLING CENTRALIZERS ON JOINTS #14175. -RIH FROM SURFACE TO 3,884'MD.PUW=98 KLBS,SOW=100 KLBS. FLUID LOSS TO WELL PAST(12)HOURS=17 BBLS 9.0 PPG BRINE. NO SLOW PUMP OPERATIONS THIS TOUR. 12:00 - 12:30 0.50 CASING P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 14 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date.6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO©45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations ((hr) (usft) 12:30 - 20:00 • 7.50 • CASING P DECOMP PJSM.RIH WITH 5-1/2"17#L-80 TC-II LINER TIE-BACK. -USE JET LUBE SEAL GUARD ON ALL TC-II CONNECTIONS. -USE TORQUE TURN SERVICES TORQUING I EACH CONNECTION TO 5,500 FT-LBS. 1-FILL CASING WITH 9.0 PPG BRINE EVERY 5 JOINTS. • -INSTALLING CENTRALIZERS ON JOINTS • , !#14175. -RIH FROM 3,884'MD TO 9,000'MD.PUW= 191 KLBS,SOW=157 KLBS. 20:00 - 00:00 4.00 CASING P DECOMP .PERFORM SPACE OUT AND STING INTO LINER TOP. 1 I-PERFORM SPACE OUT ON 5-1/2"CASING, ' RIH FROM 9,000'MD TO 9,113'MD.SET DOWN 35 KLBS TO VERIFY. '-POOH AND L/D(3)JOINTS OF 5-1/2"CASING. -P/U(2)PUP JOINTS,X-O TO 7-5/8"AND(2) 1 JOINTS 7-5/8"CASING. -RIH TO 9,113'MD,SET DOWN 40 KLBS TO VERIFY. R/U CEMENT HEAD AND PRESSURE UP TO j 1,000 PSI ON CASING TO VERIFY SEALS ARE 'BURIED.PRESSURE HELD. -WSL VERIFY ORIENTATION OF CEMENT PLUG. -BLEED OFF AND HOLD 500 PSI ON CASING. -P/U UNTIL PRESSURE DROP OFF INDICATING PORTS EXPOSED. -CIRCULATE UNTIL RETURNS AT SURFACE I TO VERIFY CIRCULATION THROUGH PORTS. FLUID LOSS TO WELL PAST(24)HOURS=32 •.BBLS 9.0 PPG BRINE. I NO SLOW PUMP OPERATIONS THIS TOUR. I I 6/2/2015 00:00 - 00:30 0.50 CASING P DECOMP I PTSM.SPCC AND EQUIPMENT CHECKS j AROUND THE RIG. • -CROWN-O-MATIC AND SPCC CHECKS. ' GOOD. Printed 7/6/2015 10.59:02AM North America-ALASKA-BP Page 15 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:0-16 RWO t45.09usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) .-- (usft) 00:30 - 03:30 3.00 CEMT P I DECOMP I PJSM.CEMENT 5-1/2"TIE-BACK TO SURFACE. i REVIEW PRESSURE CROSSCHECK LIST WITH CREW AND THIRD PARTY PERSONAL I -WSL VERIFY SLB FIELD TEST BLEND I PARAMETERS. j-PUMP 5 BBLS WATER AT 2 BPM TO FILL LINES. i-PRESSURE TEST SLB LINES TO 250 PSI I LOW,4,500 PSI HIGH.GOOD TEST. -WSL VERIFY TRIP SETTING AT 3,000 PSI. I-PUMP 10 BBLS WATER AT 5 BPM. j-BATCH UP 15.3 PPG CLASS G CEMENT. ICEMENT WET AT 01:11 HRS ON 06/02/2015. PUMP 272 BBLS 15.3 PPG CEMENT AT 5 IBPM. -SHUT DOWN AND DROP PLUG. -SLB TO DISPLACE. -PUMP 200 BBLS 9.8 PPG BRINE AT 5 BPM. ' -SLOW PUMPS TO 2 BPM. -PUMP 215 BBLS 9.8 PPG BRINE AT 2 BPM. I PLUG BUMPED 3.9 BBLS OVER CALCULATED. CEMENT IN PLACE AT 03:11 HRS ON j .06/02/2015. :-HOLD FINAL PRESSURE 3,350 PSI ON CASING FOR(5)MINUTES. 03 30 - 09:30 6.00 CEMT P DECOMP ENGAGE SEALS. -BLEED PRESSURE OFF CASING. SLACK OFF TO ENGAGE SEALS.UNABLE TO LOWER CASING TO PREVIOUS MARK ON CASING.SLACK OFF COMPLETELY,CASING STILL 3'ABOVE PREVIOUS 40K DOWN MARK. NOTE PRESSURE BUILD UP ON CASING. -ATTEMPT TO BLEED OFF PRESSURE, UNABLE TO BLEED OFF.CASING PRESSURE =1,950 PSI. -SHUT IN CASING AND HOLD PRESSURE, • WAIT ON CEMENT. !-PREPARE CELLAR FOR N/D BOPE. -R/D SLB CEMENTERS AND EQUIPMENT FROM RIG FLOOR. 09:30 - 10 00 0-50 CEMT P DECOMP OPEN UP CASING AND BLEED OFF PRESSURE.NO PRESSURE BUILD UP,FLUID STATIC. BLOW DOWN CEMENT LINES. R/D CEMENT HEAD. ' -CLEAR AND CLEAN RIG FLOOR. 110:00 - 12:00 2.00 BOPSUR P ! DECOMP PJSM.BREAK STACK AT CASING SPOOL TO INSTALL EMERGENCY SLIPS. ' P/U 50 KLBS ON CASING STRING. -FMC INSTALL EMERGENCY SLIPS IN WELL HEAD. 1 I -R/U CASING CUTTER,CUT 7-5/8"JOINT AND I UD. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 9.0 PPG BRINE. OA=0 PSI. NO SLOW PUMP OPERATIONS THIS TOUR. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 16 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor.DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO(4145.09usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 15:30 I 3.50 BOPSUR P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-0-MATICAND SPCC CHECKS. GOOD. • PJSM.SET AND TEST PACK-OFF. PULL RISER AND RACK BACK BOPE STACK SET 7-5/8"PACK-OFF. • • -N/U BOPE TO CASING SPOOL. -PRESSURE TEST PACK-OFF TO 250 PSI LOW,3,500 PSI HIGH FOR(30)CHARTED j MINUTES.GOOD TEST. !15:30 - 16:30 1.00 BOPSUR P DECOMP SET WEAR RING ID=8-7/8". R/U POWER TONGS,MOBILIZE BOT TOOLS I TO RIG FLOOR. • 16:30 - 18:00 1.50 CLEAN P DECOMP PJSM.M/U BAKER DRILL OUT BHA#7. • RIH FROM SURFACE TO 203'MD. 18:00 - 00:00 6.00 CLEAN P DECOMP RIH WITH BAKER DRILL OUT BHA#7. -RIH FROM 203'MD TO 4,897'MD ON 2-7/8"HT PAC P/U 1X1 FROM SHED.PUW=92 KLBS, SOW=81 KLBS. FLUID LOSS TO WELL PAST(24)HOURS=0 1BBLS 9.0 PPG BRINE. OA=0 PSI. •NO SLOW PUMP OPERATIONS THIS TOUR. 6/3/2015 00:00 - 00:30 0.50 CLEAN I P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00:30 - 04:30 4.00 CLEAN P DECOMP RIH WITH BAKER DRILL OUT BHA#7. -RIH FROM 4,897'MD ON 2-7/8"HT PAC P/U 1X1 FROM SHED. 1-TAG UP AT 7,947'MD.UP WT=126K,DOWN SWT=103K. -MAKE UP TOP DRIVE,ESTABLISH CIRCULATION,4 BPM=2,500 PSI. -TAG AGAIN W/CIRCULATING AT 4 BPM= 2500 PSI,HARD TAG AT 7,947'MD. 04:30 - 06:00 1.50 CLEAN P DECOMP PJSM.PUMP 20 BBLS HI-VIS SWEEP AND DISPLACE WELL FROM 9.8 PPG BRINE TO 8.5 PPG SEAWATER. • -PUMPING AT 4 BPM=2500 PSI. 06.00 - 07:00 1.00 CLEAN P ' DECOMP PJSM.RN TESTING EQUIPMENT TO TEST 5-1/2"TIE-BACK. • -CLOSE UPPER PIPE RAMS ON 4"DRILL •PIPE. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR(30)CHARTED MINUTES.PASSES BP TEST CRITERIA.WTL APPROVAL TO I PROCEED. • -INITIAL PRESSURE=3,650 PSI,(15)MINUTE PRESSURE=3,610 PSI,(30)MINUTE PRESSURE=3,600 PSI. 2.5 BBLS PUMPED TO ACHEIVE FINAL PRESSURE. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 17 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UW:500292252600 Active datum:D-16 RWO©45.09usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 12:00 5.00 CLEAN N DPRB DECOMP PJSM.DRILL CEMENT IN 5-1/2"TIE-BACK. -ESTABLISH PARAMETERS:PUW=133 KLBS, SOW=106 KLBS,ROT.WT.=118 KLBS,FREE TORQUE=3 FT-KLBS,RPM=80. ACQUIRE SLOW CIRCULATING RATES. -PUMP AT 4 BPM=2,170 PSI,WOB=2 KLBS. -DRILL CEMENT FROM 7,947'MD TO 8,062' l'MD. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 8.5 PPG BRINE. OA 12:00 00:00 12.00 CLEAN N !PT= .PSI. __ .--- --- r....-- -------� G - � DPRB DECOMP �PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.DRILL CEMENT IN 5-1/2"TIE-BACK -DRILL CEMENT FROM 8,062'MD TO 8,144' MD.DRILL PLUG AT 8,144'MD. DRILL CEMENT FROM 8,144'MD TO 8,573' MD. ACQUIRE SLOW CIRCULATING RATES AT 8,545'MD USING 8.5 PPG SEAWATER. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 8.5 PPG BRINE. OA=0 PSI. 6/4/2015 00:00 - 12:00 12.00 CLEAN N DPRB ' DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.DRILL CEMENT IN 5-1/2"TIE-BACK. -DRILL CEMENT FROM 8,573'MD. -DRILL CEMENT TO 8960'ROP=20-90 FPH. -WOB=2-3K,FREE SPIN TORQUE=3.5K FT/LBS,PUMPING 4 BPM @ 2870PSI. -PUMPING HI VIS SWEEPS AND ADDING STEEL LUBE AS NECESSARY. -UP WT=136K,DOWN WT=110K,ROT WT= 120K.ALL WT CHECKS INCLUDE 40K TOP DRIVE. -LOSSES TO WELL BORE LAST(12)HRS=0 BBLS. -ACQUIRED SLOW PUMP RATES:MP 1=30 SPM(g)1400 PSI,40 SPM(412200 PSI. MP2=30SPM @1300PSI,40SPM @2400 PSI. Printed 7/6/2015 10 59 02AM North America-ALASKA-BP Page 18 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date.6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ;12:00 - 19:30 7.50 CLEAN N DPRB DECOMP PERFORM SPCC CHECKS AND INSPECT RIG EQUIPMENT. -CONTINUE TO DRILL CEMENT F/8960'. -2-3K WOB,20-50 FPH ROP,4 BPM @ 2700 'PSI.70-85 RPM. ENCOUNTERED AND MILLED THRU UPPPER FLOAT SHOE @ 8994'&LOWER FLOAT SHOE '@ 9037'. -PUMPING SWEEP AS NECESSARY. -TAG SAND AT 9,142'MD,DRY DRILL FOR(15) 'MINUTES. ATTEMPT TO PUMP,BIT PLUGGED. I REVERSE CIRCULATE TO CLEAR BIT. -PUMP HI-VIS SWEEP.PUW=141 KLBS,SOW =114 KLBS. 19:30 21:00 1.50 CLEAN N ' DPRB BELLY BOARD. I DECOMP 'i PJSM.R/U BELLY BOARD. POOH FROM 9,110'MD TO 7,858'MD. STANDING BACK 2-7/8"HT PAC IN DERRICK. 21:00 - 00:00 3.00 CLEAN N DPRB DECOMP i PJSM.PRESSURE TEST 5-1/2"CASING. -R/U TESTING EQUIPMENT ON RIG FLOOR. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI 'HIGH FOR(30)CHARTED MINUTES.PASSES BP TEST CRITERIA.WTL RICH BURNETT 'APPROVED TO PROCEED. -INITAL TEST PRESSURE:3,800 PSI,(15) MINUTE: 3,740 PSI,(30)MINUTE:3,710 PSI. FLUID LOSS TO WELL PAST(24)HOURS=0 ' BBLS 8.5 PPG BRINE. • 'OA=0 PSI. 6/5/2015 00:00 00:30 0.50 CLEAN P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. 1 i -CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00:30 - 02:30 ; 2.00 CLEAN N DPRB i DECOMP tPJSM.RIH WITH BAKER DRILL OUT BHA#7. RIH FROM 7,858'MD AND TAG AT 9,139'MD. SET 3 KLBS TO CONFIRM. '-P/U AND PUMP AT 1 BPM=300 PSI.ROTATE AT 60 RPM,WASH DOWN TO 9,142'MD.WOB ' =5 KLBS. -DRILL AT 9,142'MD FOR(10)MINUTES.NO ERRATIC TORQUE NOTED. -COULD NOT DRY DRILL DUE TO POTENTIAL y I PLUGGED BIT. 02:30 - 03:30 1.00 CLEAN N I DPRB , DECOMP PJSM.P/U TO 9,113'MD AND CIRCULATE WELL TO CLEAN 8.5 PPG SEAWATER. -ACQUIRE SLOW CIRCULATING RATES. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 03:30 - 06:30 3.00 CLEAN N DPRB I DECOMP PJSM.POOH WITH BAKER DRILL OUT BHA#7. , -POOH FROM 9,113'MD TO 6,628'MD. 06:30 - 07:00 0.50 CLEAN N I DPRB ' DECOMP KICK WHILE TRIPPING DRILL.AAR W/CREW. -GOOD RESPONSE TIME,ALL HANDS AT THEIR STATIONS. ' I -PJSM.PUMP 10 BBLS SLUG TO PULL DRY -L ---4— PIPE. 07:00 - 10:30 3.50 CLEAN N DPRB DECOMP PJSM.CONTINUE TO POOH WITH BAKER DRILL OUT BHA#7. -POOH FROM 6,628'MD TO 203'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 19 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor.DOYON DRILLING INC. UVVI:500292252600 Active datum:D-16 RWO t 45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:30 1.00 CLEAN N DPRB DECOMP PJSM.UD BAKER DRILL OUT BHA#7 AND DRILL COLLARS. -POOH FROM 203'MD TO SURFACE. -BIT IN GAUGE AND BEARINGS GOOD, 4 1 MINOR WEAR ON TEETH. 11:30 - 12:00 0.50 CLEAN N DPRB DECOMP CLEAR AND CLEAN RIG FLOOR. FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 8.5 PPG BRINE. ;OA=0 PSI. 12 00 - 14:00 2.00 EVAL N DPRB DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.SPOT SLB WIRELINE UNIT AND M/U LOGGING TOOLS. -TROUBLE SHOOT TOOL. 14:00 - 16:00 2.00 EVAL N DPRB DECOMP I RIH WITH LOGGING TOOL TO 1,000'MD AND LOG TO SURFACE. RIH AT 100 FT/MIN,POOH AT 30 FT/MIN. TOC AT 520'MD. REPEAT DATA RUN TO CONFIRM. I-CALL ODE AND DECISION MADE TO CUT 17:30 1.50 EVAL N DPRB `0 1/2"CASING AT 440'MD. 16:00 DECOMP PJSM.R/D SLB WIRELINE UNIT AND TOOLS. -CLEAR AND CLEAN RIG FLOOR. 17:30 - 19:30 2.00 I EVAL- N DPRB DECOMP DROPPED OBJECTS DISCUSSION WITH RIG I CREW. INSPECT TOP DRIVE AND GREASE BLOCKS. -SERVICE RIG FLOOR EQUIPMENT. -MOBILIZE BAKER WLSRBP. 19:30 - 20:00 0.50 CASING N j DECOMP PJSM.M/U BAKER WLSRBPAS PER BAKER REP. 20:00 - 21:00 1.00 CASING N DPRB DECOMP PJSM.RIH VNTH BAKER RBP. -RH-I TO 518'MD COE,TOP OF TOOL AT 516' MD.PUW=45 KLBS,SOW=45 KLBS. -PRESSURE UP TO 3,000 PSI TO SET RBP. DID NOT SHEAR FREE. -BLEED PRESSURE DOWN TO 1,000 PSI. • -PULL 30 KLBS OVER TO SHEAR AND SET RBP. -SET DOWN 10 KLBS TO CONFIRM. 21:00 - 21 30 0.50 CASING N DPRB DECOMP SWAP WELL OVER TO 9.8 PPG BRINE FROM 8.5 PPG SEAWATER. -DISPLACE WELL WITH 11 BBLS. 22:30 1.00 CASING N DPRB -ACQUIRE SLOW CIRCULATING RATES. I 21 30 DECOMP PRESSURE TEST RBP TO 500 PSI FOR(5) MINUTES.PASSES BP TEST CRITERIA. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 22:30 - 23:00 0.50 CASING N DPRB DECOMP PJSM.POOH WITH BAKER RBP RUNNING TOOL. -BREAK AND UD RUNNING TOOL. 23:00 - 23:30 0.50 CASING N DPRB DECOMP PJSM.ICE BUILDING UP IN DERRICK. • -SEND DERRICKMAN UP TO KNOCK ICE BUILD UP OUT OF DERRICK. -PLACED EXCLUSION SIGNS AND MADE ANNOUNCEMENTS TO STAY OFF THE RIG FLOOR. Printed 7/6/2015 10 59•02AM North America-ALASKA-BP Page 20 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (usft) (hr) 23:30 - 00:00 0.50 CASING N DPRB DECOMP PJSM.DUMP 14 SACKS(50 LBS SACKS)OF SAND ON RBP. -M/U MULE TO 4"DRILL PIPE. -RIH TO 95'MD,R/U SAND HOPPER AT RIG I FLOOR. ,-MIX AND LET SAND DROP WITH 9.8 PPG BRINE. I FLUID LOSS TO WELL PAST(24)HOURS=0 BELS 8.5 PPG BRINE. OA=0 PSI. 6/6/2015 00:00 - 04:30 4.50 CASING N DPRB DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. j I PJSM.CONTINUE TO DUMP 14 SACKS(50 LBS SACKS)OF SAND ON RBP. -MIX AND LET SAND DROP WITH 9.8 PPG BRINE. -POOH AND UD MULE SHOE AND 4"DP FROM 95'MD. 104:30 - 05.00 0.50 CASING N DPRB DECOMP PJSM.CLOSE BLIND RAMS AND PRESSURE ,TEST BAKER RBP TO 3,000 PSI FOR(5) MINUTES. 05:00 - 05:30 0.50 CUT N DPRB DECOMP PJSM.M/U BAKER MSC CUTTER BHA#8. -RIH FROM SURFACE TO 13'MD. 05:30 - 08:00 2.50 CUT N DPRB DECOMP PJSM.RIH WITH BAKER MSC CUTTER BHA #8. -RIH FROM 13'MD TO 440'MD.TAG TOP OF SAND LIGHTLYAT461'MD. -UP WT 44K,DOWN WT 45K,ROTATING WT 45K @ 90 RPM. -FREE SPIN TORQUE OFF BOTTTOM=1-3K FT/LBS. -STAGE CUTTER BLADES @ 440'.PJSM W/ 'RIG CREW. -ROTATE @ 90 RPM,STAGE PUMP UP TO 4 BPM/1120 PSI,OBSERVE PRESSURE DROP OFF TO 760 PSI AFTER 5 MINUTES OR S0. 08:00 - 09:00 1.00 t CUT N DPRB DECOMP PJSM.CLOSE ANNULAR AND LINE UP TO TAKE RETURNS FROM THE 0/A TO THE SLOP TANK. BRING ON PUMP AND CIRCULATE @ 3 BPM/ 1400 PSI,50 BBLS TO CLEAN 9.8 PPG RETURNS FROM THE 0/A. -SHUT DOWN,BLEED ALL PRESSURE,OPEN ANNULAR AND MONITOR F/10 MINUTES, WELL STABLE. -BLOW DOWN 0/A LINE AND TOP DRIVE. 09:00 - 09:30 0.50 CUT N DPRB DECOMP PJSM.CHECK AND KNOCK ICE OUT OF THE DERRICK. 09:30 - 11:00 i1.50 CUT N DPRB DECOMP PJSM.POOH W/CUTTER BHA. -LAY DOWN CUTTER BHA.VACUUM OUT STACK AND PULL WEAR RING. 11:00 - 12:00 1.00 BOPSUR N DPRB DECOMP M/U PACK OFF RUNNING TOOL. -RIH AND ENGAGE PACK OFF,FMC BOLDS. -PULL PACK OFF AND UD. -L/D RUNNING TOOL. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 21 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO©45.09usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 BOPSUR P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. • -CROWN-O-MATIC AND SPCC CHECKS. GOOD. 12:30 - 13:00 0.50 CASING N DPRB DECOMP PJSM.M/U BAKER SPEAR BHA#9. 13:00 - 14:00 1.00 BOPSUR N DPRB DECOMP PJSM.SPLIT STACK TO RETRIEVE EMERGENCY SLIPS. -POWER DOWN AND ISOLATE ACCUMULATOR LINES TO BOPE STACK. 1-SPLIT STACK AT CASING SPOOL FLANGE. 14:00 - 17:00 3.00 CASING N DPRB DECOMP PJSM.RIH WITH BAKER SPEAR BHA#9 AND POOH WITH 5-1/2"X 7-5/8"TIE-BACK. '-ENGAGE SPEAR INTO 7-5/8"CASING. REMOVE 7-5/8"EMERGENCY SLIPS. N/U BOPE STACK -PULL 7-5/8"CASING TO RIG FLOOR. -BACK OUT BAKER SPEAR ASSEMBLY,UD • 7-5/8"CUT JOINT=11.78'. -POOH AND UD 7-5/8"AND 5-1/2"CASING. AVERAGE BREAK OUT TORQUE FOR 7-5/8" 29.7#=15 FT-KLBS,FOR 5-1/2"17#=6 !FT-KLBS. UD 5-1/2"CUT JOINT=12.42'. I-UD A TOTAL OF 439.64'OF 7-5/8"X 5-1/2"TIE BACK. _... 17:00 - 17:30 0.50 CASING N DPRB DECOMP R/D POWER TONGS AND CASING HANDLING EQUIPMENT FROM RIG FLOOR. 17:30 - 18:30 1.00 BOPSUR N DPRB DECOMP PJSM.PRESSURE TEST BOPE BREAK -SET TEST PLUG. -PRESSURE TEST TO 250 PSI LOW,1,000 PSI HIGH FOR(5)MINUTES.GOOD TEST. -BLOW DOWN LINES,PULL TEST PLUG. 18:30 - 19:00 I 0.50 BOPSUR N DECOMP INSTALL WEAR RING ID=10". DPRB -- -- - _ 19:00 - 19:30 0.50 CUT N DPRB , DECOMP PJSM.M/U BAKER DRESS OFF BHA#10. -RIH FROM SURFACE TO 122'MD. 19:30 - 22:30 3.00 CUT N DPRB DECOMP RIH WITH DRESS OFF BHA#10 AND DRESS OFF CASING STUB. RIH FROM 122'MD TO 440'MD.TAG TOP OF STUB AT 440'MD.PUW=52 KLBS,SOW=52 KLBS,ROT.WT.=52 KLBS,FREE TORQUE=2 FT-KLBS,4 BPM=80 PSI,60 RPM=2-3 FT-KLBS. -ACQUIRE SLOW CIRCULATING RATES. -DRESS OFF 5-1/2"STUB PER BAKER WITH • WOB=2-5 KLBS. -TROUBLE WORKING MILL PAST 440'MD.P/U AND ATTEMPT TO WORK PAST 440'MD. -WORK PAST 440'MD DOWN TO 445.7'MD, (SWALLOW ON DRESS OFF=5.7'.) -ROTATE AND MILL USING INNER MILL FOR (5)MINUTES. -P/U OFF OF STUB,MONITOR WELL FOR(10) MINUTES.WELL STATIC. 22:30 - 00:00 1.50 CUT N DPRB DECOMP PJSM.POOH WITH BAKER DRESS OFF BHA •#10. -POOH FROM 440'MD TO 407'MD.PUW=50 KLBS,SOW=50 KLBS. FLUID LOSS TO WELL PAST(24)HOURS=0 BBLS 9.8 PPG BRINE. • OA=O PSI. Printed 7/6/2015 10•59:02AM North America-ALASKA-BP Page 22 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO© 5.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/7/2015 00:00 - 00:30 0.50 CUT P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. ! -CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00:30 - 01:00 0.50 CUT N DPRB DECOMP PJSM.POOH WITH BAKER DRESS OFF BHA #10. -POOH FROM 407 MD TO 186'MD. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 01:00 - 02:00 1.00 CUT N DPRB DECOMP PJSM.L/D BAKER DRESS OFF BHA#10. -POOH FROM 186'MD TO SURFACE. -L/D BAKER DRESS OFF TOOLS. INSPECT WEAR PATTERN ON MILL,NOTE OFF CENTER WEAR PATTERN ON LOWER OVERSHOT MILL.UPPER INNER MILL GOOD !INDICATION OF CLEAN.DRESS OFF. 02:00 - 02:30 0.50 'BOPSUR N DPRB DECOMP ;PULL WEAR RING. 02:30 - 03:30 1.00 I BOPSUR N DPRB DECOMP 'VACUUM OUT BOPE STACK TEST 05:00 1.50 BOPSUR N DPRB -INSTA ANGEPLUG. fi 03:30• DECOMP PJSM.CHANGE OUT UPPER PIPE RAMS L - r FROM 3-1/2"X 6"VBR TO 7-5/8"FIXED. 05:00 - 07:30 2.50 BOPSUR P ' DECOMP 'PJSM.RIG UP TO PERFORM BOPE TEST. I-PERFORM BODY TEST AT 250 PSI LOW, i 3,500 PSI HIGH FOR(5)CHARTED MINUTES. GOOD TEST. 07:30 - 15:30 8.00 BOPSUR ! P T DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 2-7/8"TEST JOINT TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST UPPER 7-5/8"FIXED RAMS WITH 7-5/8" TEST JOINT TO 250 PSI,3,500 PSI HIGH FOR 5 ' CHARTED MINUTES. . -TEST LOWER 2-7/8 x 5"VARIABLE RAMS WITH 2-7/8",3-1/2"AND 4"TEST JOINT TO 250 ' PSI,3,500 PSI HIGH FOR 5 CHARTED ' MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH ' FOR 5 CHARTED MINUTES. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. -NO FAILURES. -JOHN CRISP OF AOGCC WAIVED WITNESS ' TO BOPE TEST. -R/D TEST EQUIPMENT,BLOW DOWN SURFACE LINES,RETRIEVE TEST PLUG. 15:30 - 17:00 1.50 CASING N DPRB DECOMP R/U 7-5/8"CASING HANDLING EQUIPMENT ON RIG FLOOR. -MOBILIZE HES CEMENT HEAD TO RIG FLOOR. Printed 7/6/2015 10 59.02AM North America-ALASKA-BP Page 23 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO(g45.09usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ,- '17:00 DECOMP PJSM.RIH WITH 5-1/2"X 7-5/8"TIE-BACK. us 20:30 3.50 CASING N DPRB -ALL BTC CONNECTIONS BELOW AND ABOVE ES CEMENTER BAKERLOC'D. '-USE JET LUBE SEAL GUARDS ON ALL •OTHER CONNECTIONS. TORQUE 5-1/2"17#TC-II TO 5,500 FT-LBS. I -TORQUE 7-5/8"29.7#VAMTOP HC TO 14,450 FT-LBS. -RIH FROM SURFACE TO 440'MD,TAG STUB AT 440'MD.PUW=53 KLBS,SOW=55 KLBS. ' '-ENGAGE CASING PATCH OVER STUB,SET DOWN 30 KLBS. ' PULL 50 KLBS OVER STRING WEIGHT TO VERIFY COMPLETE ENGAGEMENT. 20:30 - 21:00 0.50 CASING N 1 DPRB DECOMP I INSTALL ELEVATOR BAIL EXTENSION. 21:00 - 21:30 0.50 CEMT N DPRB DECOMP 1PJSM.R/U CEMENT HEAD AND CIRCULATING . I LINES. 21:30 - 22:30 1.00 CEMT N DPRB DECOMP PJSM.SHEAR OPEN ES CEMENTER AND CIRCULATE WELLBORE WITH HEATED 9.8 i I PPG BRINE. ,-REVIEW PRESSURE CROSSCHECK LIST AND ANSWER ALL CHALLENGE QUESTIONS. -PRESSURE TEST CASING TO 250 PSI LOW, •1,000 PSI FOR(5)CHARTED MINUTES.GOOD TEST. BRING PRESSURE UP FROM 1,000 PSI TO 1,800 PSI.NOTE ES CEMENTER SHEAR OPEN AT 1,800 PSI. -ESTABLISH CIRCULATION,ACQUIRE SLOW CIRCULATING RATES. -CIRCULATE WELLBORE UNTIL RETURNS ARE 110°F 9.8 PPG BRINE. Printed 7/6/2015 10 59:02AM North America-ALASKA-BP Page 24 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 CEMT N DPRB DECOMP PJSM.CEMENT 5-1/2"X 7-5/8"TIE-BACK. -R/U SLB CEMENTERS. -PRESSURE TEST LINES TO 250 PSI LOW, 2,500 PSI HIGH FOR(5)CHARTED MINUTES. GOOD TEST. -PUMP 40 BBLS 15.8 PPG CLASS G CEMENT AT5BPM=250-300 PSI. NOTE CEMENT RETURNS OUT OAAFTER 35 BBLS PUMPED. I-SHUT DOWN AND OPEN VALVE IN CELLAR TO U-TUBE OA AND CASING FOR(15) i MINUTES. ' -PUMP 20 BBLS 15.8 PPG CLASS G CEMENT AT 5 BPM=350 PSI. '-OPEN CEMENT HEAD AND DROP PLUG. ,-DISPLACE WITH SLB AT 2 BPM=50-170 PSI ' USING 8.5 PPG SEAWATER. NOTE CEMENT RETURNS ENTIRE DISPLACEMENT OUT OA. • -BUMP PLUG.AT 19.3 BBLS,1.0 BBL OVER I 'CALCULATED. ' i GOOD INDICATION OF ES CEMENTER CLOSING AT 750 PSI. BRING PRESSURE UP TO 2,150 PSI AND HOLD FOR 3 MINUTES. -BLEED OFF PRESSURE TO SLB UNIT,BLEED BACK 0.25 BBLS. -CHECK THAT ES CEMENTER CLOSED,NO IPRESSURE,NO FLOW BACK. I I -CEMENT IN PLACE AT 23:54 HRS ON 06/07/2015. -500 PSI COMPRESSIVE STRENGTH TIME= • 24 HOURS. 1 -MONITOR FOR WELL FOR(10)MINUTES. j WELL STATIC. I FLUID LOSS TO WELL PAST(24)HOURS=0 I � I BBLS 8.5 PPG BRINE. OA=0 PSI. x 6/8/2015 '00:00 - 01:00 I 1.00 CEMT N DPRB DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS. GOOD. PJSM.FLUSH OA,KILL LINE,STACK WITH I CITRIC PILL. BLOW DOWN LINES IN CELLAR. -RIG DOWN LINES IN CELLAR. 01:00 - 01:30 0.50 CEMT N DPRB DECOMP PJSM.R/D CEMENT HEAD AND RIG FLOOR CASING EQUIPMENT. 01:30 - 05:00 3.50 BOPSUR N DPRB DECOMP PJSM.SPLIT WELLHEAD AND INSTALL EMERGENCY SLIPS. -DRAIN OUT BOPE STACK. -FMC REP INSTALL EMERGENCY SLIPS. -R/U WACHS CUTTER AND CUT 7-5/8" CASING. -UD CUT JOINT=11.62'. • -R/D ELEVATORS AND BAIL EXTENSIONS. -INSTALL PACK OFF AND RILDS. 05.00 - 06:00 1.00 BOPSUR N DPRB DECOMP PJSM.N/U BOPE AND TURN BUCKLES. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 25 of 36 Operation Summary Report Common Well Name R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor.DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO Q45.09usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) I BOPSUR N I DPRB (usft) l 06:00 08:30 2.50 DECOMP PJSM.RIG UP TO TEST BREAK&TEST 250/ 3500 PSI,5 MIN EACH. I -TEST PACK OFF TO 250 PSI LOW,3,500 PSI HIGH FOR(30)CHARTED MINUTES.GOOD I I I TEST. -CLEAR RIG FLOOR OF 7-5/8"EQUIPMENT. MOBLIZE BAKER DRILL OUT BHA#11. -PICK UP WEAR BUSHING RUNNING TOOL _.._: AND INSTALL SAME,ID=8-7/8". 08:30 - 09:30 1.00 CLEAN N DPRB DECOMP PJSM.M/U BAKER DRILL OUT BHA#11. • -RIH FROM SURFACE TO 310'MD. 09:30 - 10:30 1.00 CLEAN N DPRB DECOMP RIH AND WITH BAKER DRILL OUT BHA#11. 1 -RIH TO 310'MD. 1-WASH DOWN FROM 310'MD TO 374'MD AT 3.5 BPM=70 PSI.PUW=50 KLBS,SOW=50 KLBS. -ACQUIRE SLOW CIRCULATING RATES. 10:30 - 12:00 1.50 CLEAN l N DPRB DECOMP PJSM.SLIP AND CUT 90'OF DRILLING LINE. 1 FLUID LOSS TO WELL PAST(12)HOURS=0 BBLS 8.5 PPG BRINE. OA=0 PSI. 12.00 - 12:30 0.50 CLEAN N DPRB DECOMP :PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. I -CROWN-O-MATIC AND SPCC CHECKS. GOOD. i _ INSPECT SAVER SUB,THREADS GOOD. 12:30 13:00 0.50 CLEAN t N DPRB � DECOMP PJSM.RIH WITH BAKER DRILL OUT BHA#11. I-RIH FROM 374'MD TO 393'MD.TAG TOP OF PLUG. ACQUIRE SLOW CIRCULATING RATES. -ESTABLISH PARAMETERS:PUW=49 KLBS, i SOW=49 KLBS,ROT.WT.=49 KLBS,RPM= 80,FREE TORQUE=2 FT-KLBS,6 BPM=200 t I PSI. 13:00 - 15:00 2.00 . CLEAN N DPRB DECOMP WAIT ON CEMENT,CIRCULATE UNTIL T RETURNS ARE 100°F. 15:00 20:00 5.00 CLEAN N DPRB DECOMP PJSM.DRILL CEMENT WITH BAKER DRILL , OUT BHA#11. -ESTABLISH PARAMETERS:PUW=49 KLBS, SOW=49 KLBS,ROT.WT.=49 KLBS,RPM= 80,FREE TORQUE=2 FT-KLBS,7 BPM=300 PSI. -DRILL CEMENT PLUG FROM 393'MD TO 397' MD. 1 -CONTINUE DRILL CEMENT FROM 397'MD TO ' 427'MD.TAG 7-5/8"X 5-1/2"CROSSOVER AT 427'MD. -PUMP HI-VIS 8.5 PPG SWEEP. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 20:00 - 20:30 0.50 CLEAN N DPRB DECOMP PJSM.POOH WITH BAKER DRILL OUT BHA #11. -POOH FROM 427'MD TO 200'MD. -MONITOR WELL.WELL STATIC. 20:30 - 21:30 1.00 CLEAN N DPRB DECOMP PJSM.L/D BAKER DRILL OUT BHA#11. -L/D DRILL COLLARS. -UD BHA#11. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 26 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UVN:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT : NPT Depth Phase Description of Operations 21:30 - 23:30 2.00 CLEAN N DPRB DECOMP PJSM.PRESSURE TEST 7-5/8"CASING. ' 1 REVIEWED PRESSURE CROSSCHECK LIST AND CHALLENGE QUESTIONS ANSWERED. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR(30)CHARTED MINUTES.PASSED !BP TESTING CRITERIA.WTL RICH BURNETT 1 APPROVED TEST TO PROCEED. 23:30 - 00:00 0.50 CLEAN N DPRB DECOMP R/D TEST EQUIPMENT FROM RIG FLOOR. ' -MOBILIZE BAKER DRILL OUT BHA#12 TO I ! I RIG FLOOR. t FLUID LOSS TO WELL PAST(24)HOURS=0 , I BBLS 8.5 PPG BRINE. OA=0 PSI. 6/9/2015 00:00 - 00:30 0.50 I CLEAN P DECOMP 1 PTSM.SPCC AND EQUIPMENT CHECKS I AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS. GOOD. 00:30 - 01:30 1.00 CLEAN N DPRB DECOMP ,PJSM.UD 4-3/4"DRILL COLLARS TO PIPE 1 - • (SHED 01:30 - 03:30 2.00 CLEAN N DPRB ! ; DECOMP ;PJSM.M/U BHA#12. i 1 MAKE UP 4 3/4"BIT,4 3/4"STRING REAMER, JUNK SUB,BUMPER SUB AND OIL JARS. --PICKUP 3 1/4"DRILL COLLARS FROM THE PIPE SHED&(3)STANDS 4"DP. -RIH TO 400' 03:30 - 05:30 2.00 CLEAN N DPRB DECOMP PJSM.ACQUIRE SLOW PUMP RATES. i-UP WT=48K,DOWN WT=50K,ROTATING WT=50K @ 70 RPM. • 1500 FT/LBS OF FREE SPIN TORQUE,TAG 7 , 5/8"X 5 1/2"X/O @ 427'. MILL ON JUNK/CEMENT F/427'-445'.3K WOB,2K FT/LBS OF TORQUE. -PUMPING 6 BPM @ 1050 PSI,PUMPING ' . SWEEPS AS NEEDED. -CONTINUE TO MILL,(STRINGERS),DOWN 'TO 461',TOP OF SAND. -WASH SAND TO 464',SWEEP HOLE AND ' _ , !DRY DRILL ON SAND(5)MINUTES TO 465'. 05:30 - 07:00 1.50 CLEAN N DPRB DECOMP PJSM.POOH TO 400',MONITOR WELL 10 MINUTES,WELL STATIC. � !-BLOW DOWN TOP DRIVE,POOH,STAND i BACK 4"DRILL PIPE. LAY DOWN 3 1/4"DRILL COLLARS,BREAK DOWN/LAY DOWN BHA. 07:00 - 08:30 1.50 CLEAN N DPRB DECOMP I PJSM.MAKE UP BHA#13,REVERSE CIRCULATING JUNK BASKET RUN. • -PICK UP(3)JTS 3 1/4"DCS FROM PIPE SHED AND RIH W/4"DP TO 309'. -WASH DOWN F/309'-404',PUMPING 4 BPM @ 550 PSI.UP WT=46K,DOWN WT=50K, ROTATING WT=50K. -DROP BALL AND ACQUIRE SLOW PUMP RATES.MP1-30 SPM/510 PSI,40 SPM/710 PSI. -MP2=30 SPM/560 PSI,40 SPM/970 PSI. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 27 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad _ — Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (usft) 08:30 - 10:00 ` 1.50 CLEAN N DPRB DECOMP TAG LIGHTLY @ 424'.PICK UP,BRING ON i PUMP @ 4 BPM/760 PSI AND WASH DOWN AND TAG HARDER @ 427'. -(X/O)7 5/8"X 5 1/2".PICK UP AND ROTATE @ 5 RPM W/PUMP ON AND ROTATE THRU WITH 1-2K SETTING DOWN AND POPPING THRU. -DRY TAG TOP OF SAND @ 461',PICKUP AND WASH DOWN @ 5 BPM/1060 PSI,5 RPM 'F/461'-465'. -TAKING WT F/463'-465'WITH NO EXCESSIVE TORQUE 500-600 FT/LBS. 10:00 - 11:00 1.00 CLEAN N DPRB DECOMP PJSM.MONITOR WELL,10 MINUTES,WELL STABLE.BLOW DOWN TOP DRIVE. -POOH F/404'TP SURFACE,CLEAN OUT I RCJB.RCJB PLUGGED,FULL OF SAND AND JUNK. 11.00 - 12:00 1.00 CLEAN N DPRB DECOMP PJSM.MAKE UP BHA#14 AND RIH F/ SURFACE.TAG 5 1/2"X 7 5/8"XO @ 427'. ROTATE THRU AS BEFORE. -ACQUIRE SLOW PUMP RATES,SAME AS I BEFORE.WASH DOWN @ 5 RPM,4 BPM @ h — I ;1060 PSI TO 480'. 12:00 - 12:30 0.50 CLEAN: P DECOMP ;INSPECT AND SERVICE RIG EQUIPMENT. 12:30 - 13:30 1.00 CLEAN N DPRB 1 DECOMP PJSM.MONITOR WELL,10 MINUTES,WELL STABLE.POOH. DEBRIS FOUND IN RCJB WITH ANOTHER LARGE PIECE OF THE ALUMINUM RING. CONSULT TOWN ODE AND DECISION MADE TO MAKE ANOTHER RCJB RUN. 13:30 - 15:00 1.50 CLEAN N DPRB DECOMP M/U CLEAN OUT BHA#15,RIH,WASH DOWN T/496'MD -TAG 7-5/8"X 5-1/2"XO @ 427'MD -SOW=50KLBS,PUW=47KLBS,ROT= I I I 47KLBS,10-RPM=2K-TO -6BPM/1180PSI,PUMP 2OBBL VISC SWEEP, DROP BALL,4BPM/1080PSI -MONITOR WELL,B/D T/D 15:00 - 16:30 1.50 CLEAN N i DPRB DECOMP POOH W/BHA#15 -R/B 4"DP,UD 3-1/4"DRILL COLLARS , -B/D RCJB BHA,SAND RECOVERED F/BOOT _ BASKETS 16:30 - 17:30 1.00 CLEAN N ' DPRB DECOMP PERFORM MAINTENANCE ON T/D -C/O UPPER IBOP ACTUATOR,SERVICE DRIVE MOTOR FILTERS 17:30 - 22:30 5.00 CLEAN N DPRB DECOMP M/U AND RIH W/BAKER FISHING RBP RETRIEVAL TOOL,RELEASE RBP,POOH -RIH T/496'MD,PUW=45KLBS,SOW= ,45KLBS ' -WASH DOWN SAND @ 4BPM 300PSI -ENGAGE RBP @ 515'MD,P/U 5',10KLBS OVER,CLOSE ANNULAR AND CBU THROUGH , CHOKE,MONITOR RETURNS -OPEN ANNULAR,R/B 1 STAND 4"DP,SEE 20KLBS OVERPULL,KELLY UP AND PUMP OUT OF 5-1/2"LNR -CONTINUE POOH,B/D BAKER RBP RETRIEVAL TOOL W/RBP(NO SCARRING ON RETRIEVAL TOOL OR RBP) Printed 7/6/2015 10:59 02AM North America-ALASKA-BP Page 28 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-01150-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. 'UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 00:00 1.50 CLEAN P—' T DECOMP M/U BAKER FISHING BHA#16,(3 5/8"RCJB). ;-P/U 6,3-1/4" D.C.'S T/404'MD,C/O ,ELEVATORS -SOW=48KLBS,PUW=49KLBS I MW= 8.5PPG IN AND OUT OA PRESSURE=OPSI @ MIDNIGHT 'LOSSES=OBBLS @ MIDNIGHT 6/10/2015 100:00 - 00:30 0.50 CLEAN P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPEMENT 00:30 - 01:00 0.50 CLEAN P DECOMP I ROTATE AND CIRCULATE @ 427'MD 3X'S T/ 'ENSURE NO DEBRIS LEFT ON XO I i 1-4 BPM 700PSI -RUN SCRAPER ACROSS PATCH @ 437'MD !(NO ISSUES) 01.00 - 08:30 7.50 CLEAN P DECOMP ,C/O ELEVATORS RIH W/2-7/8"DP F/404'MD T/ _6000'MD CONTINUE IN HOLE W/RCJB ASSEMBLY. -RIH TO 8980',ESTABLISH PARAMETERS,UP WT=147K,DOWN WT=110K. -ALL WT CHECKS INCLUDE 40KTOP DRIVE. 0830 - 10:00 1.50 CLEAN P DECOMP SET DOWN 10K @ 8987'@ TOP PORTED FLOAT COLLAR. •-PICK UP,MAKE UP TOP DRIVE AND BREAK CIRCULATION,3 BPM/1450 PSI. -ATTEMPT TO WASH DOWN,UNABLE TO WASH PAST OBSTRUCTION.PICK UP FREE. , -ACQUIRE SLOW PUMP RATES.MP1=12 SPM/170 PSI&24 SPM/700 PSI. I-MP2=10 SPM/170 PSI&20 SPM/700 PSI. ' ROTATE @ 5 RPM,2500-3000 FT/LBS FREE SPIN TORQUE. -ATTEMPT TO ROTATE THRU OBSTRUCTION I WHILE PUMPING @ 3 BPM.SET DOWN 5K. PICK UP W/OVERPULLAND EXTRA TORQUE. -WORK PIPE FREE W/(1)JAR LICK @ 165 PICK UP WT,(18K OVER UP WT). I -ATTEMPT(1)MORE TIME TO WORK PAST 8988',ROTATE AND PUMP WHILE SLACKING OFF.STACK OUT 5K @ 8990'. I -UNABLE TO WORK PAST,PICK UP W/ OVERPULLING,WORK PIPE FREE W/(1)JAR @ 20K OVER UP WT. -CONSULT WITH ODE AND AGREE TO POOH FOR JUNK MILL ASSEMBLY. 10:00 - 10:30 0.50 CLEAN P DECOMP MONITOR WELL,10 MINUTES,WELL BORE STATIC.8.5 PPG BRINE IN,8.5 PPG BRINE OUT. BLOW DOWN TOP DRIVE. 10:30 - 12:00 1.50 CLEAN P DECOMP PJSM.POOH W/2 7/8"PAC HT PIPE AND RCJB ASSEMBLY F/8890'. -UP WT=147K.LOSSES TO WELL BORE CLEAN P LAST(12)HRS=0 BBLS. 12:00 - 12:30 0.50DECOMP PERFORM SPCC CHECKS,CROWN 0 MATIC, OK. j I '-LUBRICATE AND SERVICE RIG EQUIPMENT. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 29 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO t 45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations 12:30 - 16:00 3.(r) usft) 50 CLEAN P DECOMP •PJSM.POOH W/2 7/8"PAC TH DRILL PIPE AND RCJB ASSEMBLY. -WHEN BHA IS AT BOTTOM OF BOPE,STOP AND MONITOR WELL F 10 MINUTES. I-WELL BORE STATIC,8.5 PPG BRINE IN,8.5 PPG BRINE OUT. 16:00 - 17.00 1.00 CLEAN P DECOMP PULL BHA THRU ROTARY TABLE,NOTE:JUNK (RING)RIDING ON TOP OF SCRAPER. -APPROXIMATELY 6"LONG X 6"OD X 5"ID. 17:00 - 18:30 1.50 CLEAN P DECOMP M/U BAKER FISHING CLEANOUT BHA#17 RIH F/214'MD T/1158'MD I-PERFORM D-1 DRILL W/AAR 18:30 - 00:00 5.50 CLEAN P DECOMP CONTINUE T/RIH F/1158'MD T/8909'MD -PUW=145KLBS,SOW=108KLBS,ROT WT= '125KLBS,@ 60RPM TQ=3-3.5K FT/LBS, '2490PSI @ 4BPM -WASH DOWN T/9004'MD SPR'S MPI:30SPM=1150PSI,40SPM=1810PSI MP2:30SPM=1360PSI,40SPM=2460PSI MW=8.5PPG IN AND OUT LOSSES @ MIDNIGHT=OBBLS 6/11/2015 00:00 - 02:30 2.50 CLEAN P DECOMP CONTINUE T/WASH DOWN F/9004'MD T/ 9109'MD,TAG 5.5"LNR TOP @ 9109'MD -MILL F/9109'MD-9112'MD W/5K TQ,1-2KLBS WOB. I, I -SEE 10K OVERPULL @ 9116'MD-9120'MD (NOTE:STRING MILL ABOUT 10'BACK FROM JUNK MILL IN BHA). -WORK THROUGH THE OVERPULL AREA W/ I I i 60RPM,5-6K TQ FROM BOTH JUNK MILL AND STRING MILL WHEN ENTERING OBSTRUCTION AREA. -WASH DOWN©2BPM,800PSI,T/9150'MD (LIGHT TAG ON SAND PLUG). 02:30 - 03:30 1.00 CLEAN P DECOMP P/U AND REAM FROM 9115'-9120'MD WHILE PUMPING 20BBL VISC SWEEP 03:30 - 04:00 0.50 CLEAN ' P DECOMP RIH AND TAG TOP OF SAND @ 9152'MD W/O PUMPS • -DRY DRILL TOP OF SAND F/5MINS WI 60RPM 5K TQ,P/U T/9100'MD. -5KLBS OVERPULL @ 9119'MD(STRING MILL AT 9109'MD)3KLBS BOBBLE WHEN RIH �_-__."_ THROUGH OBSTRUCTION AREA. 04:00 - 05.00 1.00 CLEAN P DECOMP CIRCULATE 20BBL VISC SWEEP @ 4BPM '2500PSISURFACE T/SURFACE 05:00 - 08.00 3.00 CLEAN P DECOMP PJSM.ELECT TO WORK PROBLEM AREA @ 9109'-9114'. WHICH CORRELATES TO THE TOP OF THE ZXP LINER TOP PACKER. -WORKING STRING MILL UP AND DOWN THRU AREA 70 RPM&4BPM/2470PSI,4- 5K FT/LBS TORQUE SEEN AT SURFACE. -PUMP 20 BBLS HI VIS SWEEP AROUND AND RUN THROUGH PROBLEM AREA WITH NO PUMP AND NOT ROTATING,SMOOTH NOW. 08:00 - 08:30 0.50 CLEAN • P DECOMP MONITOR WELL,10 MINUTES,WELL BORE STATIC,8.5 PPG BRINE IN AND OUT. Printed 7/6/2015 10"59:02AM North America-ALASKA-BP Page 30 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs • Task Code I NPT i NPTTDepth i Phase Description of Operations hr ' 08:30 - 12:00 3.50 7 CLEAN P I DECOMP PJSM.POOH W/2 7/8"PAC HT DRILL PIPE AND CLEAN OUT ASSEMBLY. -LOSSES TO WELL BORE LAST(12)HOURS= 0 BBLS. 12:00 - 12:30 0.50 CLEAN P DECOMP INSPECT RIG FLOOR EQUIPMENT,SERVICE BLOCKS,DRAWWORKS,POWER TONGS 12:30 - 14:30 l 2.00 j CLEAN P DECOMP CONTINUE T/POOH F/4718'MD T/214'MD MONITOR WELL PRIOR T/BHA ENTERING STACK. 14:30 - 15:30 1.00 CLEAN P DECOMP L/D BAKER FISHING JUNK MILL BHA#17 -JUNK MILL NOSE PACKED W/CEMENT, CIRCULAR WEAR PATTERN ON THE OUTTER EDGE OF THE MILL BLADES(SLIGHTLY RUNG). 15:30 - 16:30 1.00 CLEAN P DECOMP M/U BAKER FISHING RCJB BHA#18 16:30- - 00:00 7.50 CLEAN P DECOMP RIH W/BAKER FISHING RCJB BHA#18 F/ 214'MD T/9147'MD • -EST PARAMETERS,SOW=114KLBS,PUW= 147KLBS,ROT WT=126KLBS,40RPM FREE TO=4KLBS,4BPM=2650PSI. -TAG @ 9150'MD,WASH OVER SAND/DEBRIS W/4K WOB. SPR'S MP#1:30SPM=1050PSI,40SPM=1800PSI MP#2:30SPM=1300PSI,40SPM=2400PSI 8.5 PPG MW IN AND OUT LOSSES T/THE WELLBORE @ MIDNIGHT= OBBLS 6/12/2015 00:00 - 03:00 3.00 CLEAN P DECOMP CONTINUE T/WASH DOWN OVER DEBRIS W/ RCJB BHA#18 -PUW=147KLBS,SOW=114KLBS,ROT WT= 126KLBS @ 50RPM W/4K FT/LBS FREE TQ,4 • • BPM=2150PSI SET 5-6KLBS ON DEBRIS AND ROTATE @ 50RPM WHILE PUMPING F/9150'MD-9154'MD -STOP ROTATING,P/U OFF BOTTOM,SEE 10KLBS OVERPULL -SLACK OFF AND TAG 9153'MD W/5KLBS DOWN WT,TAKING THE BHA T/9154'MD 03:00 - 04.00 1.00 CLEAN P DECOMP P/U T/9095'MD AND PUMP 30BBL VISC PILL SWEEP @ 4BPM 2430PSI SURFACE T/ SURFACE 04:00 - 04:30 0.50 CLEAN P • DECOMP RIH,TAG SAND TOP @ 9156'MD W/O PUMPING OR ROTATION,POOH W/BAKER FISHING RCJB F/9156'MD -BLOW DOWN TOP DRIVE. 04:30 - 10:30 6.00 CLEAN P DECOMP PJSM.MONITOR WELLL/10 MINUTES/WELL BORE STABLE/8.5 PPG BRINE IN AND OUT. - POOH W/RCJB ASSEMBLY ON 2 7/8"PAC HT DRILL PIPE F/9156'-275'. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 31 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr)10:30 - 12:00 I 1.50 (usft) CLEAN P DECOMP PJSM.MONITOR WELL/10 MINUTES/WELL BORE STABLE/8.5 PPG BRINE IN AND OUT. -LAY DOWN DRILL COLLARS,BREAK DOWN RCJB.ABOUT(1)-(2)CUPS,CEMENT AND RUBBER PIECES. -LOSSES LAST(12)HOURS TO WELL BORE_ 10 BELS. '-SLOW PUMP RATES ACQUIRED @ 9100'. MP1=30 SPM @ 1050 PSI&40 SPM©1800 PSI. -MP2=30 SPM @ 1300 PSI&40 SPM @ 2400 PSI W/8.5 PPG BRINE. 12:00 - 21:30 9.50 CLEAN P DECOMP PJSM.MAKEUP RCJB ASSEMBLY,SAME BHA AS LAST RUN. RIH F/SURFACE T/9100'MD -PUW=150KLBS,SOW=112KLBS,ROT WT= 127KLBS,@ 40RPM,4-5K FT/LBS FREE TQ SPR'S MP#1:30SPM=1280PSI,40SPM=1920PSI MP#2:30SPM=1100PSI,40SPM=2200PSI 21'30 - 22:30 1.00 CLEAN P DECOMP TAG SAND @ 9154'MD WASH SAND AND DEBRIS @ 3.5BPM 2020PSI,50RPM 4-5K TQ T/ '9158'MD FIRST 1'OF WASHING DOWN TOOK 5-6KLBS WOB AND 5-6K FT-LBS TQ T/WORK THROUGH. -TQ SET @ 6KLBS,STALLED OUT TWICE WHILE ROTATING ON DEBRIS,SAW 15-20KLBS OVER PULLS AFTER EACH STALL. LAST 3'OF WASHING DOWN WERE CLEAN, W/LITTLE TQ AND TAKING VERY LITTLE WEIGHT. 22:30 - 23:30 1.00 CLEAN P DECOMP P/U BHA-30'AND CIRCULATE 2OBBL HIGH VISC SWEEP SURFACE T/SURFACE @ 4.5BPM 2594PSI -SMALL PIECES OF RUBBER AND CEMENT SEEN IN SWEEP 23:30 - 00:00 0.50 CLEAN P DECOMP MONITOR WELL F/10 MINS(WELL STATIC/ 8.5PPG MW IN AND OUT) 6/13/2015 00:00 00:30 0.50 CLEAN P ' DECOMP SERVICE RIG FLOOR EQUIPMENT,MONITOR WELL F/10MIN,WELLBORE STABLE,8.5PPG IN AND OUT 00:30 - 05:00 4.50 CLEAN P DECOMP CONTINUE T/POOH W/BAKER FISHING BHA #19 -POOH TO 275'.MONITOR WELL F/10 MINUTES,WELL BORE STATIC,8.5 PPG BRINE IN AND OUT. . 05:00 - 06:30 1.50 CLEAN P DECOMP PJSM.LAY DOWN COLLARS AND PULL BHA ABOVE ROTARY TABLE. -INSPECT JUNK SUB AND REVERSE CIRCULATING JUNK BASKET. -(2)SEGMENTS MISSING ON SHOE OF RCJB. -RECOVERED MISSING SEGMENTS IN RCJB BASKET&SOME SMALL RUBBER PIECES. -ALSO RECOVERED SIGNIFICANT AMOUNT OF SAND.CONSULT ODE...DECISION MADE TO RETRIEVE BRIDGE PLUG. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 32 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release. Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 06:30 - 07:30 1.00 CLEAN P I DECOMP CLEAR/CLEAN RIG FLOOR OF FISHING • GEAR. -BREAK DOWN REMAINING COMPONENTS OF BHA. 07:30 - 08:00 0.50 CLEAN P • DECOMP I PJSM.MAKE UP BAKER BRIDGE PLUG RETRIEVING TOOL. -PICK UP(6)COLLARS.MINIMUM ID ON BHA i_1„ -MONITOR WELL BORE/10 MINUTES,WELL BORE STATIC/8.5 PPG BRINE IN AND OUT. 08:00 - 12:00 4.00 CLEAN P DECOMP PJSM.RIH W/BAKER RETRIEVING TOOL ON 2 7/8"PAC HT DRILL PIPE. -RIH TO 5666'.UP WT=100K,DOWN WT= 87K,ALL WT CHECKS INCLUDE 40K TOP DRIVE. 1 I-LOSSES TO WELL BORE LAST(12)HOURS= 0 BBLS.0/A IS CEMENTED UP AND 0 PSI. 12:00 - 12:30 0.50 CLEAN ! P DECOMP ;SERVICE RIG EQUIPMENT AND PERFORM CHECKS. -SPCC CHECKS,OK,CROWN O MATIC,OK. 12.30 - 15:00 2.50 CLEAN P DECOMP PJSM.CONTINUE TO RIH W/BRIDGE PLUG 1j j RETRIEVING BHA. I RIH TO 9101'.UP WT=150K,DOWN WT= 110K. 15:00 - 17:00 2.00 CLEAN P DECOMP SLIP AND CUT 60'OF DRILL LINE -INSPECT DRAWWORKS -REMOVE ELEVATORS/BAILS CLEAN AND INSPECT SAVER SUB ON TD(THREAD WERE I GOOD) 17:00 - 18:30 ; 1.50 I CLEAN P DECOMP 1 CIRCULATE HIGH VISC SWEEP FROM 1 SURFACE T/SURFACE • -5BPM=2150PSI • SPR'S • MP#1:30SPM=88OPSI,40SPM=1470PSI MP#2:30SPM=1640PSI,40SPM=1720PSI 8.5PPG SEAWATER IN AND OUT 18:30 - 22:00 3.50 ; BOPSUR P DECOMP FMC ON LOCATION T/PULL WEAR RING AND RUN TEST PLUG IN PREP F/TESTING BOPE -WEAR RING PULLED ON FIRST ATTEMPT, R/U AND RIH W/TEST PLUG. 22.00 - 00:00 2.00 BOPSUR P DECOMP R/U T/TEST BOPE W/2-7/8"AND 4"TEST EQUIPMENT T/250PSI LOW,3500PSI HIGH,F/ 5 CHARTED MINS EACH -PERFORM BODY TEST/FUNCTION,RILDS. LOSSES @ MIDNIGHT=OBBLS I AOGCC REP JEFF B.JONES WAIVED —..__.' .—..— ! WITNESS TO TESTING @ 16:45,06/13/2015 6/14/2015 00:00 - 01:00 1.00 BOPSUR : P DECOMP FUNCTION LDS,PRESSURE UPON TEST PLUG,FLOW SEEN OUT OF IA VALVE,L/D TEST JNT,M/U TEST PLUG PULLING TOOL, BOLDS. 01:00 - 02:00 1.00 BOPSUR P DECOMP PULL TEST PLUG T/FLOOR,SAND AND SOME RUBBER SEEN ON TOP OF PLUG,FMC C/O SEAL ON PLUG -CREW VAC OUT STACK AND WASH TOP OF THE WELL HEAD PROFILE 02:00 - 03:00 1.00 BOPSUR P ' DECOMP RE-LAND TEST PLUG,FMC VERIFY PLUG ON SEAT,FMC RILDS,PRESSURE UP AND VERIFY NO LEAK BY TEST PLUG. Printed 7/6/2015 10:59.02AM North America-ALASKA-BP Page 33 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 -- - - _ -- - -_- ...---------._---- Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 08:00 5.00 , BOPSUR P DECOMP CONTINUE T/TEST BOPE T/250PSI LOW, 3500PSI HIGH F/5 CHARTED MINS EACH I !-TEST 2-7/8"TEST JNT AND 4"TEST JNT. ! -AOGCC REP JEFF JONES WAIVED 'WITNESSING TEST.NO FAILURES. ; -PERFORM ACCUMULATOR DRAW DOWN TEST. 08:00 - 09:00 1.00 BOPSUR P 1 DECOMP 'PJSM.RIG DOWN TEST EQUIPMENT. -BLOW DOWN CHOKE LINE,CHOKE �MANIFOLD AND KILL LINE. ; • _-._ y-MAKE UP SAFTY JT. 09:00 - 11:00 2.00 BOPSUR P DECOMP I PJSM.VACUUM OUT STACK PREP TO PULL •TEST PLUG. ; i-MAKE UP RETRIEVING TOOL,PULL AND LAY • DOWN TEST PLUG. -MAKE UP WEAR BUSHING RUNNING TOOL !MAKE UP AND INSTALL 8 7/8"WEAR ' :BUSHING. I RUN IN LOCK DOWN SCREWS,PULL WEAR BUSHING RUNNING TOOL L/D TOOLS. 11:00 - 12:00 1.00 CLEAN P DECOMP PJSM.RIH TO 9145'.ACQUIRE SLOW PUMP !RATES. -MP1=25 SPM @ 660 PSI,35 SPM @ 1220 PSI.MP2=25 SPM @ 910 PSI,35 SPM @ 1810 PSI. '-RIH TO 9163',JUST ABOVE RBP.BEGIN ; •CIRCULATING 200 VIS SWEEP,(40 BBLS). -LOSSES TO WELL BORE LAST(12)HOURS= 0 BBLS. 12:00 - 13:00 1.00 CLEAN P DECOMP PJSM.CONTINUE TO CIRCULATE HI VIS : SWEEP AROUND @ 4 BPM/2000 PSI. SEE SWEEP BACK,NOTHING MUCH IN IT. 13:00 - 13:30 0.50 I CLEAN P I DECOMP PJSM.ESTABLISH PARAMETERS,150K UP WT,110K DOWN WT. - RIH AND LATCH BRIDGE PLUG @ 9167'. PICK UP AND OBSERVE OVERPULL TO 163K, AND BRIDGE PLUG RELEASED. -RBIH TO 9175'AND PICK BACK UP TO 9165', ALL GOOD. -CLOSE ANNULAR PREVENTOR,BULLHEAD '44 BBLS @ 4 BPM/2700 PSI FCP,BLEED ALL PRESSURE. -OPEN ANNULAR PREVENTOR AND MONITOR WELL F/10 MINUTES,LOSS RATE=9 BPH 8.5 PPG BRINE. 13-30 - 14:00 0.50 CLEAN P DECOMP POOH F/9158'MD T/8900'MD,L/D 4"DP XO T/ 2-7/8"HANDLING EQUIPMENT,M/U FLOOR ; .VALVE _ -}_-_ -LOSSES INCREASE T/18BPH 14:00 - 00:00 • 10.00 CLEAN • P DECOMP CONTINUE T/POOH W/BAKER RBP LAYING DOWN 2-7/8"HT PAC PIPE 1X1 T/THE PIPE ,SHED -SPOT HIGH-VISC SWEEP @ 6500'MD T/ SLOW LOSSES i SPR'S MP#1:30SPM=680PSI,40SPM=1400PSI MP#2:30SPM=1100PSI,40SPM=1850PSI LOSSES @ MIDNIGHT=158 BBLS MW=8.5PPG IN AND OUT Printed 7/6/2015 10.59:02AM North America-ALASKA-BP Page 34 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud DateTme:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/15/2015 00:00 - 01:00 1.00 CLEAN P DECOMP L/D RBP AND RUNNING TOOL,RIH W/2 STANDS OF 4"DP AND L/D SIDEWAYS TO THE i._ !SHED 01:00 - 03:30 2.50 ; RUNCOM P RUNCMP R/U T/RUN 3.5"9.2#13Cr COMPLETION j -PULL WEAR RING,CLEAN AND CLEAR 2-7/8" HANDLING EQUIPMENT F/FLOOR -MOBILIZE DOYON CSG EQUPMENT T/ FLOOR -WALK DOWN AND VERIFY COMPLETION EQUIPMENT IN PIPE SHED W/WSL, HALIBURTON COMPLETIONS HAND,TOOL PUSH,AND DRILLER 03:30 - 07-00 3.50 RUNCOM P RUNCMP 1 PJSM.MAKEUP TAIL PIPE ASSEMBLY AS PER ' !RUNNING TALLY. -RIH W/31/2",9.2#,13CR-80 VAM TOP TUBING F/SURFACE TO-830'. USING JET LUBE SEAL GUARD PIPE DOPE AND TORQUE TURNING CONNECTIONS TO 2900 FT/LBS. -ALL CONNECTIONS BELOW PACKER ASSEMBLY BAKER LOCKED AS PER PROGRAM. ,-TAG UP @ 640',SET DOWN 5K.PICK UP FREE,ROTATE 1/2 TURN TO THE RIGHT AND ' RIH,OK. -TAG AND SET DOWN 5K LBS @ 830'.(NOTE: i 7 5/8"X 5 1/2"X/O @ 427').PICK UP FREE AND ROTATE 1/2 TURN TO THE RIGHT. -RIH AND SET DOWN,SAME SPOT,830'.3K SETTING DOWN.PICK UP FREE AND REPEAT WITHOUT ADDING ANY ROTATION. -SET DOWN @ 830',3K DOWN,PICK UP AND NOTE 10-15K OVERPULL.SHUT DOWN AND ,CALL TOWN. -HALLIBURTON TALKS TO HIS PEOPLE,WE TALK TO OURS.ESTABLISH PARAMETERS, 40K MAX OVERPULL. 07:00 - 08:30 1.50 RUNCOM I N DPRB RUNCMP PJSM.RIG UP TOP DRIVE TO CIRCULATE DOWN 3 1/2"TUBING. -BRING ON PUMP,2 BPM/50 PSI,OBSERVE i RETURNS. -PULL 5K OVER UP WT,PIPE FREE,RIG DOWN/BLOW DOWN TOP DRIVE. 08:30 - 10:00 1.50 RUNCOM N DPRB RUNCMP PJSM.POOH W/COMPLETION ASSEMBY FROM 830' I -NOTE OVERPULLS @ 800'-(5K),745'-(15K), 642-(15K),611'-(3K),517'-(3K),&482'-(3K). 10:00 - 12:00 2.00 RUNCOM N DPRB RUNCMP PJSM.CONTINUE TO LAY DOWN TUBING AND JEWELRY. -CLEANING ALL BAKER LOKED CONNECTIONS.NOTE SCRATCHES ON GLM AND COLLARS ABOVE AND BELOW IT. -LOSSES TO WELL BORE LAST(12)HRS= ' 103 BBLS 8.5 PPG BRINE. 12:00 - 18:00 6.00 RUNCOM N DPRB RUNCMP BREAK DOWN FLUTED WLEG AND SEND T/ l BOT T/BE MACHINED DOWN -BUILD 4OBBL HI-VISC PILL AND ADD 2 DRUMS OF STEEL LUBE TO 200BBLS IN THE PITS Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 35 of 36 Operation Summary Report Common Well Name:R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-01150-E:(4,140,000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations 18:00 19:00 1.00 RUNCOM N • DPRB RUNCMP I BULLHEAD 4OBBL HI-VISC SWEEP FOLLOWED BY 190BBLS OF 8.5PPG STEEL LUBE TREATED KCL @ 6BPM 19:00 21:30 2.50 RUNCOM N RUNCMP 1 ICP 1146D WLSI, G TP=1 RFORI .. 60 - DPRB M/U MILLED WLEG T/PERFORATED PUP,AND CONTINUE MAKING UP TAIL PIPE AS PER HALLIBURTON REP 21:30 00:00 2.50 RUNCOM N DPRB !, RUNCMP 1-RIH W/3.5",9.2#VAM TOP TUBING AS PER RUNNING TALLY T/484'MD -TAG UP W/STRING WEIGHT @ 484'MD,PU AND MAKE QUARTER TURN ADJUSTMENT TI !GET THROUGH H TAG UP @ 516'MD,611'MD,642'MD,742'MD, 774'MD,830'MD,862'MD UTILIZE QUARTER i TURNS AND LINK TILT ADJUSTMENTS T/ •WORKTHROUGH. 6/16/2015 00:00 - 06:00 6.00 RUNCOM P RUNCMP CONTINUE T/RIH W/3.5"9.2#,VAMTOP I COMPLETION -HANGING UP REGULARLY,SETTING DOWN UP TO 10K AT TIMES. -SEEING THE OCCASIONAL OVER PULL TO 20K OVER UP WT FROM TIME TO TIME. HANG UPS OCCUR APPROXIMATELY 31'OR THE LENGTH OF EACH JT. -ADDING A GLM W/PUPS SEEMS TO ALTER THE FREQUENCY. -@ 06:00,DEPTH OF WLEG IS ! 4 APPROXIMATELY 2500'.61K UP WT,60K DOWN WT. -LOSS RATE W/RUNNING IN THE HOLE IS 5 I BPH OF 8.5 PPG BRINE. 06:00 - 12:00 6.00 RUNCOM P ! i RUNCMP CONTINUE T/RIH W/3.5"9.2#,VAMTOP !COMPLETION ' I -RIH T/4903'MD,PUW=82KLBS,SOW= !75KBLS. -CONTINUE T/SEE WEIGHT TAG EVERY-31'. LOSSES @ NOON=52BBLS 8.5PPG MW IN AND OUT 12 00 - 12:30 0.50 RUNCOM P • , RUNCMP SERVICE RIG FLOOR EQUIPMENT 112:30 - 20:30 • 8.00 1 RUNCOM ' P RUNCMP CONTINUE T/RIH W/3.5"9.2#,VAMTOP COMPLETION -RIH T/9100'MD AS PER TALLY,PUW= 120KLBS,SOW=101KLBS. -TORQUE TURN ALL CONNECTIONS T/ 2900FT-LBS. 20.30 - 22.00 1.50 RUNCOM P RUNCMP RIH W/LNR HANGER -DRAIN STACK,P/U LANDING JOINT. -M/U HANGER AS PER FMC REP. -LAND HANGER ON DEPTH©9116'MD. -RILDS AND B/O LANDING JOINT. 22:00 - 23:30 1.50 RUNCOM P RUNCMP R/U REVERSE CIRCULATE 110BBLS OF CORROSION INHIBITOR @ 2BPM 340PSI -PUMP 5BBLS DOWN TBG T/WASH UP ON TOP OF RHC. -M/U LANDING JNT,DROP 1-5/16"BALL AND ROD. 23:30 00:00 0.50 RUNCOM P RUNCMP :FLUID PACK CIRC LINES,CLOSE BLIND RAMS AND PRESSURE UP T/250PSI/5MIN,3500PSI/ 30MINS -PKR BEGIN SETTING 200PSI. Printed 7/6/2015 10:59:02AM North America-ALASKA-BP Page 36 of 36 Operation Summary Report Common Well Name: R-39 AFE No Event Type:WORKOVER(WO) Start Date:5/22/2015 End Date:6/17/2015 X4-0115D-E.(4,140.000.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1995 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292252600 Active datum:D-16 RWO @45.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/17/2015 00:00 - 02:00 2.00 RUNCOM P RUNCMP CONTINUE TESTING TBG T/3500PSI F/ 30MINS(GOOD TEST),BLEED TBG T/2000PSI, TEST IA T/250PSI F/5MINS ADN 3500PSI F/ 30MINS(GOOD TEST) I CONTACT WTL RICH BURNETT FOR APPROVAL T/MOVE FORWARD. -BLEED OFF TUBING AND SHEAR DCK CIRCULATE BOTH WAYS TO ENSURE CLEAN SHEAR 02:00 - 06 00 4.00 RUNCOM P RUNCMP CIRCULATE IN FREEZE PROTECT,U-TUBE FLUIDS,SET TWC AND TEST FROM BELOW -PUMP 45BBLS OF DIESEL DOWN THE IA, SHUT IN AND ALLOW T/U-TUBE. -ENSURE ALL PRESSURE IS BLED OFF, OPEN BLINDS,DRY ROD TWC. -TEST TWC FROM BELOW T/3500PSI. 106:00 - 12:00 6.00 RUNCOM P RUNCMP OPEN BOPE RAM DOORS AND SWAP UPPER RAMS T/7" -CLEAN AND CLEAR RAM CAVITIES OF ANY DEBRIS FROM CEMENTING/MILLING. -SWAP OUT DOOR SEALS AND PLACE A BODY TEST ON BOP'S(NO LEAKS). 12:00 - 18:00 6.00 RUNCOM P RUNCMP N/D BOPE,N/U ADAPTER FLANGE AND TREE -TEST ADAPTER T/5000PSI F/30MINS, 250PSI/5000PSI VISUAL LEAK TIGHT TEST ON THE TREE. -SECURE THE TREE AND CELLAR,CLEAN PITS,R/U F/MOVE. RIG RELEASED FROM WELL R-39A I 18:00 06/17/2015 Printed 7/6/2015 10•59:02AM N O N.- a) o) m W Q J c 0 M `n Er Ic o LU w o Nm W N o- = O < aa) ti Lc) _C o U Z 0 o -mo in o) u cO < LU COZ ) c M ; m 0 LU U UU U 0Q J a L c 4 0 mn NE amQ pwI_ Oo o o 0 j., N a) -0 LL O N Z D p U O O O O O 0 LO N O CO S N N 5 N O O O) O X N N O O O r t!) O) o ai -6 N a) N O O 0 E -C 2 2 N O � a .' a) Z.. N ajN ? C x (7, a) E ❑ ❑ W P di a) O N Q O) = c m o a-) a- aO Z `- ai `O o W o E O ~ ) cn Q v •m a) -- a aa Ti) C o a Lu C a) m p a E c -I ^ n o U t0 J O } N HO N U) a) O > r N J ai C ns E a) 7 CLI a) �..t C Q O a) L `° 7, o c S aiE 0 , ❑ �_ , co 0 O Q O) > C U O Q m CO o o m 3 w v v v f¢1I C o C m a a 0 » O W w W d n 0 U C o m o) a 13 a) 4fc° a) C. m .5 a 0 E ' © c 6 a 0E E < y a) c7 E g Q .c N N o_ N -C Z a>) m Lu L Ca-- O -o a) Z cn OCO o }O m `m Ci) m 7 Z m N ❑ t7 N u)) ca .0 - O. Fti N p N V a0 d N Z E in U M rn ^cc 00 d' a) -Cr') a) o) 0 V .- N O) m m E -o E CL or Z c d a) > U u) d 9) 5 U) (n Lu < O U) a) Z j o w < N r6 c w Q Z U) O 2 5 H ❑ 0 a co O p Z L.I. W O m W a Z U) J Q W . < 6 W 0 U 2 y Q O Z H 0 o Z J Z m W o _ O W Z Q 2 Y Ti. z o W U W w m Lu U > Y co Z w Z < o I O 0 U w 2 w a o w o z m a O w 2 co m Q M ' cn z .. w v a w a E � `m m a) ,- >o ❑ o E w in z z o E m Y z m ... m a) E m Z Q 0 0 LA a cCr, E m O O 03 c H d v ❑ N (1) a) CT aj • d T O O 0 > H 3 E d a) 7 a) a n m cn112 voi nT d aci m o Z ~ > a o 0 � d O N n. O (h Ot o ° > o _o E E ( m .� :2 n -o Y a) a , .v m CD o m O o w 0 v v a cc t a 5 a > in 0 2 0 ❑ o 0 0 0 N U O 3 N ° a O u O! Q 07 ...;`f IO N R) J 4 1 o FoaP = d 0.1 T] N co • a) d • U t' O ' (n N N' Z Z a U C7 a) ct a) (0 O a ` a T LPi Q -O W O I a) J a) O a V 5 tT a O c m i E N N c N m a E a s Z (oln > o _ N N CL C J O N v ca . R O CO CL a) aa, m E . T a _°_6 d C CO 47 W Ce la a m v 6 a m o a) a) or 13) a Q a N a m v 65 p > > a) o -a c -o 0 DI (n _ .3 WCD 0 i+ c a' 8 o aOi E E 0 m aEi "L C o to o °� •a U ~ a Z H U o E � m U E CO N d m oa Y E X E- c ° C E. ''', 'I© m 3 c C• (n `o) O sco a �° E 30 0 0 0 aE) o _c U 5 a3 n O = F- -, _ 0- x Z tr H d N- O o N o a m N 2 a N E a a aQ H a • Z L 0 Z as a) a tU m O (n (n U U _ H O Y ') Q 6 «) a' 7 _O Q m L 3 U) O 111 c U) O J N D N `O 0 2 03 �° N r X a O c N 3 a) ~ p O. 3 m y a F 0 I W C U) C O a > O_ a) 'E ;=,2,U W v o a cl a u N c a n O N 4 C _ p O Z o U W Z • z Z _ o ° C >. E) Z a H ▪ E a� T • W Cr U) 2 a a rn Q) N Y O 00 UJ w 03 O. U0 c CO J S zN E m E 3 m 0) T U O CY Oco 'O >, —1 a N .. LIJ C)LU N - 3 Q) 'Oa oN W Q N a c c J lL a "Oa CL! Q0 QO U � 0 a y N (Ya 'O ~ c E N° Z E a) m e cD0FSU 0 mU, O > O Yc H H UE ` U COU aw 4 N G 0 w a w .. O 0 Et _ c Z _W W o N C-7-- --5) W D A o E a = O 0 a) co L o U U c m W o B. L,.5 H Z H o 'o d. U I? c .- m a W 0 m g ao a) o `n J X X X X a 0000 c, LEJ N L LL 0 N- : cc Q o O O O O in O aJ _ N O N. O O X N N O O ,- O T O CO . CO CO O E L • N O co a. R - mco- co N . ' N Op C,.1.. C C U E — CU a) X r )❑ 2 ❑ W W Lo N o d 6 7 C a) O i E o o O E 0 a) nLL m cc co C X H ns 2 >.- -0 a) m 0 a CC c U CC CO M o a) co-, 0 CO d U in p } 0 • Q o m To in O > Na) N C n a1 E 7 a ( N d O CO 'm m c 0. O ❑ 2 o •C 7 j O. O) j C o (n O (/) �0y) W 2-' �o 0 Lc) _C .. CO m > Q x N RS N a) N U V CO 7 Q E N E o c a) x x > m COG1 N c u m ❑ ❑ W W (n a > t0 w o c `O " o j h iz -o o .' o m o v = a ns LL Q o ai a 0 E L V 0 N N d a) 'o z a m CI O v) O In -o x Z o }O rn m U m 3 N .. 2' . Q) Q N LI- N O N U O M C) i0 v' Z Q' N N 7 al p) r) N C7 xi m E -o E S d 0 Z a) a) r > 0 V) a) NO) U w co 'w Q O a) a) cc E c H 7 .E- Z > > 2' o 0 cc 0 O mx 4'a Y6 c U) Q Z Y H U 5 H o 0 Q co O w O cc J J U_ w m w PA , Q 0 C¢7 Q Q in- 0 N z W W _ o w o Z Z Y CO Z o U w J > } w v m Y Z O Z < r rn O C7 U Q 2 CT w a po po c.-2 Z aJO w Z W W W m 4 �''opj J N H LiT's "t F U 0- ,— N 5 a) CO co cc T > D as W in 3 z o U) > O lEmY z o E ¢ N Z a, o O N a c m E yN- rd a) co O O N Q c C NLO ❑ N E a) a) O) Qj c a 0- ° U aai > ,-' E a w 2 ai to O co„ E U ~ fa CO. O. C C O C' O CO a) ; T p C al c a) a) - a > o N H N- CO o CO d E O` > o > 0 0) a O N d "O U L j h o CO r O LL w O ❑ ' 0 U a LL n a > <n O C7 ❑ ❑ ❑ o N I ] \ E0 =f/ _ co �� ISi {} k co $ ) 7 \ 2 & o. \ ¥ — co zz . / ] » £ E (3a } } ~ a E =N 0 a , 2 - z J : ) ƒ ) Z \ / ) ( ce 0- 12 ƒ } $ $ 3 ƒ - \ 2 a £ - - E # k z z co / / ) /) & a 2 » \ i \ ) \ \ \ \ - o I CO ) § ( t ) } 0a \ - _ $ * C/) -E Co * ) \ } } a) 2 k / \ o # .4 > $ f ] ) a q k \ / E o { \ k = ) z } 0 E \ \ . } - \ \ _ & / 2 ( / B k ( \ E § 0 / { } 0 y U - § o ¥ p a _ ¥ 0 z ƒ — \ \ j \ \ / = y \ 3 = = rHs } � ) ( _ _ _ a ) § E -0 2 ° / # z J f zCD $ . /_ & r @ U) 0 < bAE r% f ° 2 0 rx a)— 5 \ \ E y a r { ƒ . . , f ) { 0 2 ± } � 2 } } \ ) ) ^ /e r ƒ/ \ z w 2 Co \ /® ° - 0 ¥ z 0 z . z zccf / - 1 z i cn ss 0 \_ cL % k ) S CO 1E / ƒ z § cn / E 2 C 6)- 1 s / / \ ) 70 _ ( ) o 2 k ƒ _ C \ 5 > U % ¢ 2 ( .. a , i ! a IR •E \ 7 = ® ) } { 0 J 0 Q a } / & 0 0 \ V.m `cm 6 ` 5 E ( c = 2 0 2 & ( , w :< e A 0 S 5 3 0 3 e f TREE= CM/4-1/16" I WELLHEAD= FMC IR-39A SAFETY NOTES: WELL ANGLE>700 @ 9396'"`" ACTUATOR= BAKER C CHROME TBG&LNR"""4-1/2"SLTD LNR I ADJUSTED 13'PER ORIGINAL SET DEPTH NITIAL KB.ELE 60.3" ami= --- ---- - --iis7' 2 w KOP= 1951' Q 408' 7-5/8"HES BTC ES CEMENTER — — — — — -- 20"COND, — --120' -� Max Angle= 92'@ 10336' # * — . 440' —{7-5/8"X 5-v2"XO,D=4-892" 91 5#,H-40, Datum MD= 10649' ." .. *. D=19.124" , , 2234' —{3-1/2"HES X NIP,D=2.813" Datum TVD= 8800'SS { , D GAS LIFT MANGRE_S 5-1/2"BOWEN CSG PATCH, =4-892" H 452'-454' .+ ST MD ND DEV TYPE VLV LATCH PORT DATE . 7-5/8"CSG STUB(05/30/15) — 1975' -# * 'I , 6 3550 3463 22 KBG2 DMY INT 0 06/20/15 —�I 5 5434 5219 21 KBG2 DMY NT 0 06/11/15 10-3/4"CSG,45-5#, H 2451' ' 4 6687 6387 21 KBG2 DMY NT 0 06/11/15 NT 8OCY HE NSCC,ID=9.953" * MY 3 7596 7246 17 KBG2 DNT 0 06/11/15 ♦. 2 8252 7888 6 KBG2 DMY NT 0 06/11/15 4. 1 8782 8406 27 KBG2 DMY NT 0 06/11/15 Minimum ID = 2.813" @ 2234' . 3-1/2" HES X NIPPLE I r 8876' —13-1/2"HES X NP,D=2-813" * 8907' H 5-1/2"X 3-1/2"HES TNT PKR,ID=2-830" 3-1/2"PERFORATED PUP JOINT,D=2.992" H 9120' ,* QM 14w 9006' H3-1/2"HES SLD SLV,D=2-813" 5-1/2"PORTED SEAL ASSY,D=4.892" H 9131' I r GFS L 9070' H3-1l2"SEALBORE SUB,D=2.813" 3-112"TBG,9-2#,13CR-8O VAM TOP, 9131' e / ` ,�! H 0087 bpf,D=2.992" l� 9131' —{3-112"WLEG,D=2.992" 7-5/8"X 5-1/2"2RH ZXP LTP w/HD,D=4.810" —1 9131' SMD TT NOT LOGGED 7-5/8"X 5-1/2"FLEX-LOCK HGR,D=4.80" H 9150' 5-1/2"SCAB LNR 17#,L-80 TCO, H 9221' .0232 bpf,D=4-892" TOP OF 4-1/2"LNR H 9221' FI 9221' —7-5/8"X 4-1/2"11W SS HORZ PKR W/SCOOP TOP,D=3-902" 7-5/8"CSG,297#, — 9316' NT-BOCY HE NSCC,D=6.875" PERFORATION SUMMARY REF LOG:NA ANGLE AT TOP FERE:67°@ 9295' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 4-1/2" SLID 9296-10352 SLOT 06/06/95 2-7/8" SLTD 10303-10748 SLOT 06/24/96 I 10303' —I BKR PBR W/GS FISHING PROFILE,ID=3-0" 4-1/2"SLTD LNR,12.6#,13CR-80 NSCT, H 10388' _0152 bpf,U=3.953' 2-7/8"SLTD LNR,6.16#,L-80 FL4S, —1 1074$' \ ; ; -00579 bpf,ID=2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/09/95 POOL 7 INITIAL COMPLETION WELL R 39A 06125/96 ? CTD SIDETRACK(R-39A) PERMff No:'1960840 06117115 D-16 RWO AR Nb: 50-029-22526-01 06/22/15 JMD DRLG HO CORRECTIONS SEC 32,T12N,R13E,623 FSL&897'FWL 06/25/15 JB/JMD FINAL ODE APPROVAL 07/08/15 JMD 7-5/8"&5-1/2"LNR DEPTH EDITS BP Exploration(Alaska) - -- - - dol-6.'0%24 259°►5 WELL LOG TRANSMITTAL DATA LOGGED ..i.K.1BENDER To: Alaska Oil and Gas Conservation Comm. June 22, 2015 Attn.: Makana Bender, 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 JUN 26 2U1:i RE: Cement Bond Log: R-39A Run Date: 5/30/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 R-39A Digital Log Image files 1 CD Rom 50-029-22526-01 Cement Bond Log 1 Color Log 50-029-22526-01 scoop ` `101 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: 6...ekzeet OF Th., �w\� 1�j..s� THE STATE Alaska Oil and Gas m� ����� Ao Conservation Commission F = - � fALAS ;A • if 4_= 333 West Seventh Avenue *M„ plGOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 OF ALAS'" Main: 907.279.1433 P, 1'1 Fax. 907 276 7542 , CR��� ,V W1 ' �J "u' www aogcc alaska gov David Bjork Engineering Team Leader V ` 0 c6 ti- BP Exploration(Alaska), Inc. ` � P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU R-39A Sundry Number: 315-036 Dear Mr. Bjork: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 0./-67Pq_e_i,24_,___ 1 Cathy P. Foerster Chair DATED this 3 day of March, 2015 Encl. STATE OF ALASKA RECEIVED S ALAS...OIL AND GAS CONSERVATION COMM.._,ION APPLICATION FOR SUNDRY APPROVAL JAN 2� 2015 20 AAC 25.280 MS 3 'its 1 Type of Request' AOGCC ❑Abandon 0 Plug for Redrill 0 Perforate New Pool ®Repair Well 0 Change Approved Program 0 Suspend 0 Plug Perforations 0 Perforate ®Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well ❑Stimulate ®Alter Casing ®Other 5-1/2"Scab Liner 2 Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 196-084 3. Address: o Exploratory 0 Stratigraphic Alaska 99519-6612 ®Development 0 Service P.O. Box 196612,Anchorage, 6. API Number: 50.029-22526-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a Spacing Exception? 0 Yes-121 No PBU R-39A 9. Property Designator - 10.Field/Pool(s) ADL 028279&028282 Prudhoe Bay/Prudhoe Bay - 11 PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft) Effective Depth TVD(ft): Plugs(measured): Junk(measured) 10748' • 8900' - 10748' 8900' 9007' None Casing Length Size MD TVD Burst Collapse Structural Conductor 79' 20" 41'- 120' 41'- 120' 1490 470 Surface 2411' 10-3/4" 40'-2451' 40'-2432' 5210 2480 Intermediate 9277' 7-5/8" 39'-9316' 39'-8740' 6890 4790 Production Liner Slotted Liner 1167' 4-1/2" 9208'- 10375' 8698'-8816' 8430 7500 Slotted Liner 444' 2-7/8" 10304'- 10748' 8818'-8900' 13450 13890 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): Slotted Liner 9296'-10352',10303'-10748' Slotted Liner 8733'-8817',8818'-8900' 4-1/2", 12.6# NT-13Cr80 9030' Packers and SSSV Type: 7-5/8"x 4-1/2' Baker SABL-3 Packer Packers and SSSV 8984'/8568' MD(ft)and ND(ft). 12 Attachments. 13.Well Class after proposed work: ®Description Summary of Proposal ® BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic ®Development 0 Service 14. Estimated Date for 15. Well Status after proposed work. Commencing Operation April 1,2015 • ®Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval. Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative 0 WAG 0 SPLUG 0 Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact. J.E.B.Bolen,564-5110 Printed Name: David Bjorkk � Title. Engineering Team Leader Email: J.E.B.Bolen@bp.com Signature: �/li� Phone: 564-5683 Date: olig yf Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3\5- 03 Liz ❑Plug Integrity In BOP Test 0 Mechanical Integrity Test 0 Location Clearance Other:0op t�5 iz to 35-6 62 /)5I (/TSP /5 226, p5, ) fJ vi h // - p r-c ✓lH frr tr 5 _ /_ Z 5-0 U p$ • Spacing Exception Required? 0 Yes Er No Subsequent Form Required: it —4a4 APPROVED BY Approved By. 2COMMISSIONER THE COMMISSION Date: 3-3-l Form 10-403 Revised 1 12to©R\ ''e� Iiat i it for 12 months from the date of approval Submit In Duplicate vrI 2 ' is vv /� id IJ��,�3-75 RBDMS 3 MAR - 5 1015 2 I. 2_3, 4. . - by Sundry Request for casing repair Well: R-39A Date: 01/15/2015 Engineer: J.E.B. Bolen MASP: 2269 psi Well Type: Producer Estimated Start date: April 1, 2015 History: R-39 was drilled in 1995 as a horizontal slotted liner completion in upper Zone 4. The well came on at a high rate, but after one year the rate had declined considerably and had a 72% WC. The problem was believed to be low vertical permeability, the horizontal section was not undulating. In 1996 we performed a 373' toe drill out, which went deeper into Z4. This initially increased the production rate considerably. The well has been on a gentle decline since. Well Integrity > 04/08/14: OART OA rides at-500 psi > 04/15/14: PPPOT-IC Passed > 05/09/14: MIT-OA Failed > 05/20/14: Set XX Plug at 9007', DGLV's sta#'s 2, 3, &4, MIT-T Failed > 05/21/14: MIT-T Passed to 2500 psi, MIT-IA Failed w/ LLR of 0.6 bpm @ 2500 psi > 06/20/14: LDL confirmed leak @ -2522 ELMD in production casing. While the well was SI in April 2014 it was noticed it would not stack out, we confirmed it was not a surface or instrumentation issue and appeared to be a down hole problem. We went on to set dummy GLV's and MIT the well. The initial MIT-T failed, we re-set 3 valves and the next MIT-T passed. The MIT- IA failed with a LLR of 0.6 bpm. We then ran an Archer LDL pumping down the IA, confirmed PC leak at 2522' MD, also saw the leak at a similar depth with echometer. Scope of Work: The primary objective of this RWO is to restore well integrity and return the well to operable status. Pre Rig Prep Work: W 1 Exercise all LDS. PPPOT-T to 5,000 psi & PPPOT-IC to 3,500 psi (if older than six months E 2 Perform a power jet cut 2-3' below the top of the collar of the first full joint above the packer. Cut depth should be -8926' MD. Refer to 6/7/95 tubing tally (4.5" 13Cr80 NSCT tubing). F 3 Circulate well with seawater and diesel FP. O 4 Cement control line with 1 gallon of squeezecrete. Displace cement with a small volume (-8 oz) of hydraulic fluid Repeat on balance line O 5 Pressure test control and balance line per the following: Perform a 5 minute test to 3000 psi. Pressure loss cannot be greater than 50 psi (10 psi per minute for 5 minutes) ✓ 6 Prep annular valves, set a TWC and dry hole tree. O 7 Remove the flow line and well house. Level the pad as needed for the rig. Proposed RWO Procedure: • MIRU Doyon 16. Pull TWC. Circulate KWF. Set TWC.. • ND tree. NU and test BOPE with four preventers configured top down (annular, 7-5/8" fixed, blind shears, mud cross and 3-1/2"x 6"VBR's). Test the fixed, blind and VBR's and annular to 3,500 psi. Pull TWC. • • Pull 4-W 12.6# 13-Cr80 tubing from jet cut—8,926' MD. • Rotate out the K anchor and remove the remaining tubing from above the packer. • Mill and retrieve the Baker SABL-3 packer. • Install lower 5-1/2" scab liner(w/RBP installed at surface). • RIH with RTTS to test lower scab. • RU E-line, Run USIT in the 75/8" casing to determine TOC in the 75/8"x 10-3/4"annulus. • Cut and pull 7-5/8" casing above TOC. • Run 5-1/2" tie-back from lower scab liner to surface. Hang in original wellhead. • Cement 5-1/2"tie-back to surface. • Pressure test 5-1/2" tie-back. • Drill out and clean out shoe tract. • Retrieve 5-1/2" RBP from lower scab liner. • Run 3-1/2" 9.3# 13Cr80 VamTop gas lifted completion. • Circulation completion fluid. Drop ball-n-rod. • Set 3-1/2" x 5-1/2" HES TNT packer. • MIT Tubing, MIT-IA. FP Well. • Set&test TWC. ND BOPE, NU dry hole tree. RDMO. Post rig Work W 1 Install new production tree. ✓ 2 Pull TWC S 3 Pull ball and rod, Pull RHC seat, Install generic GLD. O 4 Install flow line and well house. Pop Well. TREE= 4-1/16"5MCNV AELLFEAD= 10-3/4"5M FMC R-39A tFETY NOTES: WELL ANGLE>70" 9396'"" ACTUATOR= BAKER I 4-1/2"CHROME TBG&SLOTTED LNR"' URAL KB.ELE 59' ' BF.ELEV= 22.97' KOP= 1951' Max Angle- 92"©10336' r 2112' --14-1/2"FES FIX°SSSV PP,D=3.813" Datum MD= 10649' O Datum TVD= 8800'SS GAS LET MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 10-3/4'CSG,45.5#,NT-80 G1'EE D=9.953" H 2451' 6 3050 2998 22 KBM3 DMY BK 0 05/21/14 5 5253 5051 21 KBMG OMY BK 0 05/21/14 �j 4 6524 6235 21 KBM3 CMY BK 0 05/21/14 ��� 3 7542 7194 17 KBM3 DRAY BK 0 05/21/14 2 8360 7996 4 KBMS DRAY BK 0 05/21/14 Minimum ID = 2A41" @ 10303' 1 8907 8511 39 KBM3 DMY BK 0 01/24/10 TOP OF 2-7/8" LINER ' 1 8972' H4-1/2"F£5 X NP,D=3.813" g R' 8984' 7-5/8"X 4-1/2'BKR SABL-3 PKR W/K ANCHOR ASSY,Et=3.875' 181 9007' H4-1/2"FES X NP,D=3.813" 9007' -14-1/2"XX PLUG(05/20/14) 1 1--1 9018' -141/2"FES XN NP,D=3.80" 4-1/2'TBG,12.6#,NT-13CR-80, H 9030' I- / \ —I 9030' H41'2'WLBG,D=3.958' .0152 bpf,D=3.958" 9024' H ELiu TT LOGGED 09/14/95 TOP OF 41/2"SLID LNR -� 9208' 9208' ,--7-5/8'X 4-1/2'TRW SS HORZ PKR W/SCOOP TOP,D=3.9" 7-5/8"CSG,29.7#,NT-80 NSCC,ID=6.875" H I 9316' 141 1 PERFORATION SUMMARY REF LOG:NA ANGLE AT TOP PERF:67"@ 9295' Note:Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 4-1/2" SLID 9296-10352 SLOT 06/06/95 2-7/8" SLID 10303-10748 SLOT 06/24/96 [ 10303' -i BKR PBR W/GS FISHING PROFEE,D=3.0" II 41/2"SLID LPR,12.6#,13CR 80 NSCT, --) 10375' A . , .0152 bpf,D=3.953" 2-7/8'SLID LW,6.16#,L-80, - 1074 h .00579 bpf,ID=2.441" DATE REV BY COMENTS DATE REV BY COMMENTS RSIJDHOEBAY UNFT 06/09195 POOL 7 INITIAL COMPLETION 06/19/14 GJ/PJC SET XX PLUG(05/20/14) WELL: R-39A 06/25/96 CTD SIDETRACK(R-39A) PERKY'kb:'1960840 01/24/10 RCT/PJC GLV C/O(01/24/10) AR No: 50-029-22526-01 05/17/13 PJC GLV/PERF CORRECTIONS SEC 32,T12N,R13E,623'FSL&897'RM... 03/20/14 SWGJMD GLV CIO(03/17/14) 06/05/14 DLW/PJC GLC C/O(05/21/14) EW Exploration(Alaska) TREE= , 4-1/16"5M CNV R-3 9 A kFETY NOTES: WELL ANGLE>70"@ 9396'"' ,WELLHEAD= 10-3/4"5M FMC 'ACTUATOR= BAKER Proposed RWO 4-1/r CHROME TBG&SLOTTED LNR"" 1�ITIALKB.ELE 59' ..'4711 .*" BF.ELEV= 22.9T KOP= 1951' 4' M3X ---- ° 32 200' 3 1/2"FES NP,ID=2.813" Max Angle= 92°@ 1033_6' I I r Datum MD= 10649' ,4 Datum TVD= 8800'SS 10-3/4"CSG,45.5#,NT-80 CY FIE D=9.953" H 2451' a� ti 5. • 1 • q'. � sM • «'s 5-112"CSG,17#,L-80 TC-II ID 4.892" X4 —8,950' —13-112"HES X NIP,ID=2.813" 3-1/2"TBG,9.3,13Cr-80 VamTop E2.992" • 2 s —8,981' 15-1/2"X 3-112"HES'TNT PKR ID=2.88" .4 ~w I I — —9,015' —13-112"HES X NIP,ID=2.813" • Minimum ID = 2A41" @ 10303' ., TOP OF 2-7/8" LINER • I '9,088' —13-1/2"HES XN NIP,ID=2.75" • — —13-1/2"WLEG,ID=2.992" TOP OF 4-1/2"SLTD LNR 9208' 9208' 7-5/8"X 4-1/2"TNV SS HORZ R<R W/SCOOP TOP,ID=3.9" 7-5/8"CSG,29.7#, NT-80 NSCC,ID=6.875" 9316' , PERFORATION SUWivtARY REF LOG:NA I ' ANGLE AT TOP PERF:67°@ 9295' Note:Refer to Production DB for historical pert data SIZE SFF INTERVAL Opn/Sgz SHOT SQZ , 4-1/2" SLTD 9296-10352 SLOT 06/06/95 2-718" SLTD 10303-10748 SLOT 06/24/96 10303' - I BKR PBR W/GS FISHNG PROFILE,ID=3.0" ll - 4-1/2"SLTD LNR, 12.6#,13CR-80 NSCT, H 10375' .0152 bpf, ID=3.953" 2-7/8"SLID LNR,6.16#,L-80, — 10748' .00579 bpf,ID=2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/09/95 POOL 7 INITIAL COMPLETION 06/19/14 GJ/PJC SET XX PLUG(05/20/14) WELL: R-39A 06/25/96_ CTD SIDETRACK(R-39A) PEWIT No:'1960840 01/24/10 RCT/PJC GLV CJO(01/24/10) AR No: 50-029-22526-01 05/17/13 PJC GLV/PERF CORRECTIONS SEC 32,T12N,R13E 623'FSL&897'RM. 03/20/14 SWC/JMD GLV C/O(03/17/14) 06/05/14 DLW/PJC GLC C/O(05/21/14) BP Exploration(Alaska) §k ! ;;• |°' o; ti. `-6') ( 5 (■o: \ 0 '1 5° 5 / ! g o /\u) M % » .o .00 .o ; fi § �i( \ ( D �\ )/ Ioo ,oo .� [ \`&= w « _ ;0, r .1- r = 0-, § (:° '1° a )� o 0 0 Eo" |°' )/ I - N . 1 a cp ( | | i o0 co , ` St ii ! ¥_ ! !@\01 �' ; /»„ , , - - \ „ } , _ _. �_ \ \c 4 ;;: _, / .03 - K ))� - „ ,/ ƒ ƒ CZ _ }- -� | m pig j e « § � K ) ! j /K2 ! § rk \ }\ 9 9 k \■p 3 I \ §! ( �e !|/ ' } ; �` !\ } ;|( ;f§ /§ kk « 1 �2 ----L—R- :' � �. ) \() %3 k Re, *5 \) --�— - | | _ 1 Ii £ £ � , >����� I , ` r } . I ;/� § _.� ---- —� | —— g -� 0.— +—�---- / —} ! , 1 �fJ2--� ul | i ' & - i �f ,� fI /§ ( i i j i .w i , i j j I i _ ! ! :; i i , i j — _ \iIi i ) i ��iI1_ i 1, i i i I , )—� }� ° E i : I { cre i • cn Loepp, Victoria T (DOA) From: Bjork, David <David.Bjork@bp.com> Sent: Thursday, February 19,2015 10:59 AM To: Loepp,Victoria T(DOA) Cc: Daniel, Ryan; Bolen,J.e.b. Subject: FW: PBU R-39A(PTD 196-084, Sundry 315-036)Correct message Victoria, Please help me understand the concern around the 5-1/2" long string cement job. We do not routinely log scab liners or long strings when repairing production casing leaks in producing wells. While cementing the 5-1/2" long string: the reservoir will be isolated, all cementing will be performed in cased hole,the production casing leak is small (0.6BPM @2,500psi),the long string will be centralized, cement returns will be taken at surface and 20bbls excess will be pumped. I will give you a call to discuss. Ryan Daniel can address the standard well integrity monitoring plan for gas lifted producing wells. I have a general awareness of our Well Integrity Operating Practice, Ryan is the authority. Regards, Dave From: Bolen,J.e.b. Sent:Thursday, February 19, 2015 9:37 AM To: Bjork, David Subject: FW: PBU R-39A(PTD 196-084, Sundry 315-036) Correct message From: Loepp, Victoria T(DOA) [mailto:victoria.loepp©alaska.gov] Sent: Thursday, February 19, 2015 9:35 AM To: Bolen,J.e.b. Subject: FW: PBU R-39A(PTD 196-084, Sundry 315-036) Correct message Please see questions below. From: Loepp, Victoria T(DOA) Sent: Thursday, February 19, 2015 9:10 AM To: Bolen,J.e.b. (J.e.b.Bolen@bp.com) Subject: PBU R-39A(PTD 196-084, Sundry 315-036) J.E.B. Would like to see a cement evaluation log run in 5-1/2"casing. Will this well be on gas lift?What are your monitoring plans for verifying the integrity of the 5-1/2"casing on an intermittent basis? Thanx, Victoria Mr. Tom Maunder '~ ~ fU ~ ~~ ~ ~~ ~ ~ ~ Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB R-Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB R- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Torin Roschinger, at 659-5102. Sincerely, Anna Dube, P.E. BPXA, Well Integrity Coordinator ~ ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Reqort of Sundry Operations (10-404) R-pad Date Revised 7/10/2009 Well Name ARI # PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitoN sealant date ft bbls ft na al R-02 50029203540000 1781000 1.25 NA 1.25 NA 6.8 5/11 /2009 R-03A 50029203640100 1981710 1.5 NA 1.5 NA 7.65 5/13/2009 R-04 50029203740000 1790380 225 NA 2.25 NA 13.6 5113/2009 R-05A 50029203800100 1972500 0 NA 0 NA 3 5/13/2009 R-06A 50029203880100 1981270 0.75 NA 0.75 NA 13.17 5/13/2009 R-07A 50029205230100 2000100 2.25 NA 225 NA 43 5/11(2009 R-OS 50029205480000 1810010 0.25 NA 0.25 NA 1.7 6/12/2009 R-09A 50029206090100 1982330 3.25 NA 3.25 NA 17.85 5/14/2009 R-10 50029206180000 1810930 2 NA 2 NA 14.5 6l22l2009 R-11A 50029208930100 1982060 0.25 NA 0.25 NA 1.7 6/11/2009 R-12 50029209210000 1830350 0.25 NA 0.25 NA 1.7 6/12/2009 R-13 50029209290000 1830440 24 NA 24 NA 96.9 6/23l2009 R-14 50029209090100 2021560 0 NA 0 NA 0.04 5/18/2009 R-15A 50029209170100 1990360 0 NA 0 NA 1.7 5/18/2009 R-16 50029206860000 1811740 15 MA 15 NA 107.5 5/17/2009 R-17A 50029206770100 1981380 4 NA 4 NA 27.2 5/15/2009 R-186 50029206330200 1981190 6.75 NA 6.75 NA 48.87 5/15/2009 R-19A 50029206370100 1971710 8.5 NA 8.5 IVA 67.48 5/17f2009 R-21 50029209970000 1831200 0.25 NA 0.25 NA 3.4 6/13/2009 R-22 50029210050000 1831280 0.5 NA 0.5 NA 4.3 6/12/2009 R-23A 50029210130100 1972020 2.25 NA 2.25 NA i 6.2 6/12/2009 R-24 50029212320000 1842160 9.5 NA 9.5 NA 37.4 6/12/2009 R-25A 50029222780100 1972300 0 NA 0 NA 1.7 5/18/2009 R-26A 50029215470000 1860370 0.75 NA 0.75 NA 4.3 6/22/2009 R-27 50029215570000 1860510 0.25 NA 0.25 NA 1.7 6/11/2009 R-29 50029222750100 1971070 20 3.9 1.25 NA 11.05 5/14/2009 R-31 A 50029222770100 2021500 1.5 NA 1.5 NA 8.5 5l1112009 R-32A 50029224130100 1980090 0.75 NA 0.75 NA $.5 6/11/2009 R-34 50029224080000 1931530 0 NA 0 NA 2.5 5/18/2009 R-35 50029224240000 1931810 0.25 NA 0.25 NA 1.7 5J11l2009 R-36 50029225220000 1941440 3.25 NA 3.25 NA 44.2 5/14/2009 R-39A 50029225260100 1960840 2 NA 2 NA 22.1 5/11/2009 R-40 50029229260000 1982000 1.5 (VA 1.5 NA 6.8 5l14/2009 R-41 50029233990000 2081530 3.25 NA 3.25 NA 22.1 5/12/2009 ~ , ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 Subject: Corrosion Inhibitor Treatments of R-Pad Dear Mr. Maunder, Enclosed please find a spreadsheet with a list of wells from R-Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, f I/~~~ ~, ~~ ~ vl~q~~~~~ `l~j S~t ~,~ f...~~f~~ ~> ~~ ,~Y~ ~' Torin Roschinger BPXA, Well Integrity Coordinator ~ ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date R-pad 6/25/2009 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al R-02 1781000 1.25 NA 1.25 NA 6.8 5/11 /2009 R-03A 1981710 1.5 NA 1.5 NA 7.65 5/13/2009 R-04 1790380 2.25 NA 225 NA 13.6 5/13/2009 R-05A 1972500 0 NA 0 NA 3 5/13/2009 R-06A 1981270 0.75 NA 0.75 NA 13.17 5/13/2009 R-07A 2000100 2.25 NA 2.25 NA 43 5/11 /2009 R-08 1810010 0.25 NA 0.25 NA 1.7 6/12/2009 R-09A 1982330 325 NA 3.25 NA 17.85 5/14/2009 R-10 1810930 2 NA 2 NA 14.5 6/22/2009 R-11 A 1982060 0.25 NA 0.25 NA 1.7 6/11 /2009 R-12 1830350 0.25 NA 0.25 NA 1.7 6/12/2009 R-13 1830440 3.75 NA 3.75 NA 76.5 6/22/2009 R-14 2021560 0 NA 0 NA 0.04 5/18/2009 R-15A 1990360 0 NA 0 NA 1.7 5/18/2009 R-16 1811740 15 NA 15 NA 107.5 5/17/2009 R-17A 1981380 4 NA 4 NA 27.2 5/15/2009 R-18B 1981190 6.75 NA 6.75 NA 48.87 5/15/2009 R-19A 1971710 8.5 NA 8.5 NA 67.48 5/17/2009 R-21 1831200 0.25 NA 0.25 NA 3.4 6/13/2009 R-22 1831280 0.5 NA 0.5 NA 4.3 6/12/2009 R-23A 1972020 2.25 NA 2.25 NA 16.2 6/12/2009 R-24 1842160 9.5 NA 9.5 NA 37.4 6/12/2009 R-25A 1972300 0 NA 0 NA 1.7 5/18/2009 R-26A 1860370 0.75 NA 0.75 NA 4.3 6/22/2009 R-27 1860510 0.25 NA 0.25 NA 1.7 6/11 /2009 R-29 1971070 20 3.9 125 NA 11.05 5/14/2009 R-31A 2021500 1.5 NA 1.5 NA 8.5 5/11/2009 R-32A 1980090 0.75 NA 0.75 NA 8.5 6/11/2009 R-34 1931530 0 NA 0 NA 2.5 5/18/2009 R-35 1931810 0.25 NA 0.25 NA 1.7 5/11 /2009 R-36 1941440 3.25 NA 3.25 NA 44.2 5/14/2009 R-39A 1960840 2 NA 2 NA 22.1 5/11/2009 R-40 1982000 1.5 NA 1.5 NA 6.8 5/14/2009 R-41 2081530 3.25 NA 3.25 NA 22.1 5/12/2009 O1',I OR BEFORE c..t,om~,~M.~°c ' PERMIT AOGCC Individual Well Geological Materials Inventory Page: 1 Date: 06/09/98 DATA T DATA PLUS RUN RECVD ~0363-10741 FINAL 11/27/96 96-084 SLIM GR 96-084 7536 T SCHL. SLIM1 GR 1 11/27/96 10-407 ~OMPLETION DATE ~ /,~7 ~/~/ 7/ /3-//~ / DAILY WELL OPS R G/~b/q6/ TO ~/A)~/9~/ Are dry ditch samples required? yes ~~_~And received? yes - no--- Was the well cored? yes ~Analysis & description received? ~ Are well tests required? yes ~Received? Well is in compliance ~ Initial ye s '~no--. COMMENTS GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10595 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 11/25/96 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape G-12A 7~¥ 96295 OH EDIT-MWD SLIM GR 960706 1 1 1 R-39A 7~.% ~ 96240 OH EDIT-MWD SLIM GR 96.0--623 I I 1 S-40A 7~ ~- 96296 OH EDIT-MWD SLIM GE 96091 4 I I 1 .,, -- -- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered' Schlumber~jcr GeoQuest 500 W. Inter~ational Airport Road Anchorage, Alaska 99618-1199 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Date: October 31, 1996 Attention' Steve McMains Subject: Revised Completion Reports for Wells S-28A, S-02A, D-17A, R-39A A quality check of our surveys found that incorrect surveys were submitted for the wells S-28A, S-02A, D-17A, and R-39A. A miscommunication between vendors resulted in outdated geomagnetic models being used. The problems have been resolved and the survey data recalculated. The enclosed Completion Reports show the revised bottomhole locations. Corrected surveys are attached, and are the true and correct surveys for these wells. If there are any questions please contact me at 564-5894. Thank you. Sincerely, Theresa Mills Coiled Tubing Technical Assistant 3 - . -~* STATE OF ALASKA .... -.' ALASKAO,. .-~ND GAS CONSERVATION COM, $SION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPEI'~DED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number _BP Exploration 96-84 3. Address 8. APl Number P. O. Box 196612, Anchora~le, Alaska 99519-6612 5o-029-22526-01 4. Location of well at surface ...%~-~ ........... 9. Unit or Lease Name ",'~ ~' ' ~';~" 10.Prudh°ewell NumberBay Unit 623' NSL, 4382' WEL, Sec.32, T12N, R13E At Top Producing Interval 359'NSL, 966' WEL, Sec. 31, T12N, R13E ?" R-39A !.,...:..~~.~~ 11. Field and Pool At Total Depth Prudhoe Bay Field/Prudhoe Bay Pool 784' SNL, 115' WEL, Sec. 6, T11N, R13E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. 48.80' KBE 1028282 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 6/21/96 6/24/96 6/25/96I n/a feet MSLI one 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 10,748 MD, 8841'ss 10,748'MD, 8841'ssTVD YES [] N3 []I 2112'feet MD approx 1900' 22. Type Electric or Other Logs Run Gamma Ray 23. CASING, LINER AND CEMENTING RECOF~ SE-FI'lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO-FI-OM HOLE SIZE CEMENTING RECOP~ AMOUNT PUU_ED 2-7/8" 6.16# L-80 10304 10748 3-3/4" uncemented slotted liner 24. Perforations open to Production (MD+TVD of Top and Bottom and ~5. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) ~ _ 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. _ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 6/25/96 GL Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SlZE IGAS-OIL RATIO TEST PERIOD ~' I Flow Tubing Casing Pressure CALCULATED DIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence ot oil, gas or water. Submit core chips. ,~_ -~,-,¢~.-,.,,~ .~..~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. " ~--' 30. ' ' , GEOLOGIC MARKERS FOE iON TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9117' 8653' Shublik 9194' 8691' Top of Sadlerochit 9458' 8788' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~/~,.~~ Title Coiled Tubing Drilling Engineer Date 10/21/96 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 R-39A Anadrill *** ..... ************ Survey Program ..... *** ........... * Company Well Name Location 1 Location 2 Magnetic Declination Magnetic Model Magnetic Model Date Grid Convergence Angle Grid Zone KBE Date Anadrill Job Number AFE APl BP Exploration R-39A Prudhoe Bay North Slope Borough, Alaska 28.33 deg IGBG-95 6/21/96 Alaska State Plane Zone 4 59.00 ft 10/2/96 38042 F51 R39 50-029-22526-01 Well Head Location Grid X 634549.18 Grid Y 5977090.00 Lat (N/-S) 70° 20' 43.226" Long(E/-W) -148° 54' 28.229" 70.34534042 -148.90784146 Azimuth from Tie-In to TD is Departure from Tie-In to TD is 138.95 320.82 deg ft Tie-In Point (TIP) Measured Depth True Vert Depth Inclination Azimuth Latitude (N/-S) Departure (E/-W) 10395.00 ft 8815.58 ft 91.70 deg 144.60 deg -1152.65 ft -1236.46 ft ********** Note: All Directions & Coordinates are referenced to TRUE North ********** Anadrill- Schlumberger Alaska District R-39A Anadrill Survey Calculations Minimum Curvature Method Measured Interval Vertical Target Station Azimuth Latitude Departure Displacement at Azimuth DLS Depth Depth Section Incln. +N/-S +E/-W ft ft ft ft deg deg ft ft 10395.00 0.0 8815.58 57.28 91.70 144.60 -1152.65 -1236.46 10411.00 16.0 8815.39 73.22 89.70 142.83 -1165.54 -1227.00 10441.00 30.0 8816.25 103.14 87.00 142.23 -1189.34 -1208.76 10471.00 30.0 8818.42 133.01 84.70 142.53 -1213.04 -1190.49 10501.00 30.0 8821.48 162.83 83.60 140.13 -1236.34 -1171.85 deg/ ft deg 100ft 1690.40 227.01 0.00 1692.34 226.47 16.69 1695.77 225.46 9.22 1699.63 224.46 7.73 1703.45 223.47 8.76 10531.00 30.0 8825.60 192.54 80.60 137.93 -1258.77 -1152.37 10561.00 30.0 8831.61 221.92 76.30 139.13 -1280.79 -1132.91 10591.00 30.0 8839.47 250.87 73.30 138.43 -1302.56 -1113.83 10621.00 30.0 8848.84 279.36 70.30 138.63 -1323.91 -1094.96 10651.00 30.0 8859.67 307.33 67.40 137.53 -1344.73 -1076.27 1706.59 222.47 12.36 1709.94 221.49 14.86 1713.85 220.53 10.25 1718.05 219.59 10.02 1722.40 218.67 10.25 10681.00 30.0 8871.68 334.81 65.40 136.33 -1364.82 -1057.50 10729.00 48.0 8891.90 378.09 64.80 130.03 -1394.59 -1025.78 1726.57 217.77 7.61 1731.22 216.34 11.97 ******************** End Of Survey ******************** Anadrill- Schlumberger Alaska District STATE OF ALASKA ' ALASK/' ....'iLAND GAS CONSERVATION CC -'MISSION 'WELL COMPLETION OR RECOMP LETION hEPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPEhDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 96-84 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 5o-029-22526-01 4. Location of well at surface 9. Unit or Lease Name 623' NSL, 4382' WEL, Sec.32, T12N, R13E¢._ ................. ~ Prudhoe Bay Unit 359'NSL, 966' WEL, Sec. 31, T12N, R13E~ At Total Depth i ~.~2 i'--'-'; Prudhoo Bay Fiold/Prudhoe Bay Pool 803'SNL, 92' WEL, Sec. 6, T11N, R13E./~ 5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and Serial No. 48.80' KBE 1028282 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 6/21/96 6/24/96 6/25/96I n/a feet MSLI one 17. Total Depth (MD+TVD) .18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 10,748 MD, 8841'ss 10,748'MD, 8841'ssTVD YES [] NO []I 2112'feet MD approx 1900' 22. Type Electric or Other Logs Run Gamma Ray 23. CASING, LINER AND CEMENTING RE-COI:~ SE'I-RNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO-FI'OM HOLE SITE CEMENTING RECOFD AMOUNT PULLED 2-7/8" 6.16# L-80 10304 10748 3-3/4" uncemented slotted liner 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED _)7. PRODUCTION TEST Date First Production JMethod of Operation (Flowing, gas lift, etc.) 6/25/96 Date of Test Hours Tested TEsTPRODUCTIONpERIOD FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Casing Pressure OALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) =ress. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED Alask~ 0il & 8as Cons, 6omm~ssio~ Anch0r,'tge Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. · GEOLOGIC MARKERS'~-'-' ~-- ~,MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9117' 8653' Shublik 9194' 8691' Top of Sadlerochit 9458' 8788' 31. LIST OF A'I-I-ACHM ENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~ TitloCo,/edTubin_qDri,/in_qEn_~/neer Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Daily Operations Well: R-39A Accept: 6/20/96 Field: Prudhoe Bay Spud: 6/21/96 APl' 50-029-22526-01 Release' 6/25/96 Permit: 96-84 CTD Unit: Date Day Depth 6120196 1 10,375 Move in and rig up Substructure, Tower and CTD unit. Continue general rig up of equipment. Replace P-24 hydraulic pump for injector head. 6/21/96 2 10,375 Replace P-24 hydraulic pump for injector head. MIRU Nabors fluids skid. Function test BOP'S and HCR valve. FVl/U milling BHA and RIH. Stop RIH at 2500 ft. Hyd pump not supplying enough pressure. Adjust pump and cont RIH. Mill through XN and liner guide shoe. 6/22~96 3 10,405 Replace P-24 hydraulic pump for injector head. MIRU Nabors fluids skid. Function test BOP'S and HCR valve. M/U milling BHA and RIH. Stop RIH at 2500 ft. Hyd pump not supplying enough pressure. Adjust pump and cont RIH. Mill through XN and liner guide shoe. Drilled 10 ft of formation. Turn well over to FLOPRO, POOH. M/U directional BHA, Test orientor - OK. RIH with drilling BHA. Stop at 2500 ft and check tools. POOH and check tools. Found drilling solids in Anadrill tool. Circ and condition mud at surface. RIH and check tools @ 2500', OK. RIH and tag PBD @ 11362' CTD and correct to 11385'. Drill 20' while trying to orient TF, but orientor seemed locked. POOH to inspect. Install Sperry orientor. RIH 6123196 4 10,720 RIH with Drilling BHA. Check orientor / Directional tools at 6000 ft. RIH and start drilling. Pump jacking problems. Drill to 10,419 ft, Re-orient and had trouble getting back to TD. Many stalls at different depth above bottom. Finally work past junk in hole and drill to 10,460 ft, taking surveys every 30 ft. Log GR to tie-in depth. Drill ahead with numerous stalls surveying every 30' to 10520'. Drill and survey every 30' to 10720'. 6/24/96 5 10,748 Drill to 10,741'. Survey. Short trip to tubing tail. RIH. Drill to Final TD of 10,748 ft BKB [8.841ft TVDSS]. Geologist looked at GR Icg and found TSAD at 8760 ft TVDSS and had 60 ft TVD of good sand below the Pyrite zone. Made two wiper trips, hole in good condition. POOH. Layout directional tools. Pick up 2 7/8" Slotted liner using tower and winches. M/U Baker PBR and GS spear hyd release running tool. RIH with liner on 2 3/8" CT. Land liner on bottom. Top is at 10304'. Release from liner. Displace and recover FIoPro mud with filtered seawater. POOH. RD liner setting tools. Blow down CT w/N2. Begin RD CTU. 6/25/96 6 10,748 RD CTU. Use Peak 140 ton crane to pick inj head and tower sections and place on floats. Load substructure. N/U swab valve, m/u tree cap, secure well. Truck all equipment to G-12A for next sidetrack. Off location at 14.00 hrs. Total days on well = 5.3 days, R-39A Well is secured and ready to flow R ~ (~ ~ IV ~ D JUL 1,5 199G 0il & Gas Cons. Commission An0, h0r,"tge PAG£ NO, *********** SURVEY AHAL¥SIS COMPANY ~P EXPLORATION ~£LL NA~£ LOCATION I P~UDHO£ ~A¥ LOCATION 2 ALASKA DATE; 23-JUN-96 MAGfi£TIC DECLINATION 27,94 GRID CONVERGENCE ANGLE A?I NO AFE NO FS1R3V ~ELL NUMBER 0 MD Tg~ IHC_CHG CUMIHC_CHG I.RATE AZ~_CHG CUMAZM_CHG TU~H_RATZ ft ft deq de~ de~/lOOft deq deg de~/lOOft ft de~ de~/lOOft deg/lOOft~2 I03~5,0 ~756,60 0,00 0,00 0,00 0,00 0,00 0,00 -327,85 0,00 0,00 0,0~ I0~11,0 ~756,40 -2,00 -2,00 -iZ,50 -I,20 -1,20 -7,50 -312,66 14~,03 14,58 91,10 10441,0 8757,27 -2,70 -4,70 -?.00 -0,60 -I,&O -2o00 -284,03 167,50 9,22 l?,&6 10471,0 875~,44 -~,SO -7,00 -7,67 0,30 -1,50 1,00 -255,44 172.67 7,73 4,96 10501.0 87~,50 -I,10 -8,I0 -3,67 -2,40 -3,?0 -8,00 0,00 0.00 8,76 ~,44 10531,0 ~7~,&2 -3,00 -!i,I0 -lO,CO -2,20 -~,I0 -7,33 105&loO 8772o&3 -4,30 -15,40 -14,33 1,20 -4,90 4,00 10591,0 8780,49 -3,00 -18,40- -I0,00 -0,70 -5,~0 -2,33 -t41,!~ 1~7,40 10,£5 lO&2I,O 81~?,86 -3,00 -ZI,40 -10,00 0,20 -5.40 0,67 -113,45 10651.0 8800,~8 -2,?0 -24,30 -9,67 -I,10 -6;50 -3,a7 10681,0 8812,~9 -2o00 -26,30 -6,~7 -1,20 -7,70 -4,00 -5~,26 151,44 7.61 6,82 10729,0 8832,?2 -0,60 -26,?0 -1,25 -6,30 -14,00 -i3o12 -16,17 97,32 11o?? ?,0? P 10748°0 8841o04 -0,20 -27,10 -1,05 -2,50 -16,50 -13,16 O,V~ 95,57 11,94 O,l~ T = TI~ IN POINt P : PROJ£CT£~ SURU£¥ TO TD PAC£ NO. COMPANY ~P EXPLORATION WELL NAM~ R-37 LOCATION ! PRU~HOE LOCATION 2 ACASXA MAGNETIC ~£CLINATION 27,~4 ~RI~ CONVER~HC~ ANGL~ 0,00 DATE; 23-JUN-?6 W~L[ NUMBER API NO 50-027-22526-0~ W~LL HEA~ LOCATION: LAT(N/-S) 70,35 D~P(£/-W) -148,Yl AZIMUTH FROM ROTAR~ TA~L£ TO TARGET IS TIE IN POiNT(TIP) ~£ASURE~ ~£PTH TRUE VXRT ~PTH INCLINATION AZIMUTH LATITU~E(N/-S) D~PARTUR£(E/-W) I03~5.00 ~756,~0 Yl,/O 143,60 -II74,70 -1215,70 F..,.~E NO, 2 SURVEY CALCULATIONB ~**~*~****** CIRCULA~ ARC MEASURED INTERVAL VERTICAL DEPTH DEPTH it ft ft T 10395,00 0,0 10411,00 16,0 8756,40 10441,00 30,0 8757,27 I0471.00 30.0 875?,44 10501.00 30,0 8762,50 TARGET STATION AZIMUTH LATITUD~ SECT!OH INCLH, N/-S ft de§ ~eg ft 0,00 91,70 143,60 5,00 89,70 I42,40 -IIS7,4~ !3,91 87,00 141.80 -1211.14 22.74 ~4,70 142.10 -1234,70 31.0! 83,60 139.70 -1257.86 DEPARTUR~ ~ISF'LACEM£NT ~t ~ZIMUTH DL~ B/-W deo/ ft it de9 lOOft -1215,70 16~O."~ ~25,?~ 0.00 -1206,07 1692,55 Z25,45 14,58 -!187,6~ i~6,28 m~4,44 -II69,ZI 1700,45 223,44 7.73 -1150,39 1704,58 222,44 8,76 10531,00 30.0 8766.62 10561,00 30.0 8772,63 10591.00 30.0 8780.49 10621,00 30.0 8789,86 I0651.00 30.0 8800.68 38.10 80.60 ~o~,Jv -1250.14 44,86 76,30 I38.70 -1302.01 51.64 73.30 138.00 -1323.64 58,20 70,30 138,20 '1344,85 64.42 67.40 137.10 ' '1365,53 -I130.75 1708.03 221,45 I2.36 -Ii11.12 1711,67 220.48 14,86 -I0~1,68 1715,6~_ 219,52 I0 -1072,85 !720.36 218,58 10.02 -1054.01 1724,~? 217,66 10681,00 30,0 8812,6~ 10729,00 48,0 8832,92 1¢748,00 19,0 8841,04 70,00 65,40 135,?0 -1S~5.47 76.02 64.80 129.60 -I415,01 77.08 ~4,60 I27,I0 -i425,67 -i035,0t 1719,43 21,~,76 /,61 -I003,14 1734,52 215,22 I1,~7 -96y.67 I735,51 2i4,77 11,~4 T: TIE IN POINT P = PROJ~CTE) SURVEY TO TD, STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION COILED TUBING DRILLING BOPE TEST OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: 4.5" Liner Test: Initial X Workover: X CAMCO Rig No. 958 PTD # BPX Alaska Rep.: R-39 Rig Rep.: Set @ 10,375' Location: Sec. Weekly Other DATE: 6/21/96 96-84 Rig Ph.# 448-1312 Rick Whitlow Ron De Witt 32 T. 12N R. 13E Meridian Umiat TEST DATA MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location OK Standing Order Posted OK BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Test FLOOR SAFETY VALVES: Quan. Pressure P/F Well Sign OK Ball Type N/A I 350/3500 I Drl. Rig OK Hazard Sec. OK Quan. 350/4,000 P 350/4,000 P 350/4,000 P 350/4,000 P 350/4,000 P 350/4,000 P Test Press. P/F Test 250/2, 500 P Pressure P/F 25O/4OOO P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 250/3000 P P N/A Functioned Functioned ACCUMULATOR SYSTEM: System Pressure 2, 660 I P Pressure After Closure 1,700 I P MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes '/0 sec. Pit Level Indicators OK OK System Pressure Attained minutes 42 sec. Meth. Gas Detector OK OK Blind Switch Covers: Master: YES Remote: YES H2S Gas Detector OK OK Nitgn. Btl's: Psig. TEST RESULTS Number of Failures: 0 ,Test Time: ~ours. Number of valves tested 8 Repair or Replacement of Failed Equipment will be made within 0 ~s. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Very good test; A24 hour notification was not given -- Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES NO X Waived By: Witnessed By: FI-021 L (Rev. 12/94) AI9LFTDD.XLS State of Alaska TO: David John?~ Chairman Alaska Oil and Gas Conservation Commission DATE: June 20, 1996 FILE NO: ai91ftdd.doc John Spauldingu.-o~,., SUBJECT: Petroleum Il J ,~' lk,.J . BOPE Test-CAMCO 958 BPX well R-39A PBU Prudhoe Oil Pool PTD #~ Thursday June 20, 1996: I traveled this date~BPX well R-39 PBU to witness the BOPE Test on CAMCO CTU 958 prior to deepening the bottom hole location. The AOGCC test form is attached for reference. Notification of the BOPE Test was received approximately 6 hours from the actual time of wanting to test. I informed Mr. Rick Whitlow BPX rep. that I was busy,acrd' with other work and i would arrive as soon as was possible. I also reminded Mr. Whitlow of the 24 hour notification clause in the AOGCC regulations. The test went quite well with no failures observed. The area around the CTU was well laid out with good access to the unit from all directions. Summary: I witnessed the BOPE Test on CAMCO CTU 958, 0 failures, 4 hour test time. Attachments: ai91ftdd.xls X Unclassified Confidential Confidential (Unclassified if document removed) TONY KNOWLES, GOVERNOR AI~AS~& OIL AND GA~ CONSERVATION CO~Vt~IISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 1, 1996 Ted Stagg, Coiled Tubing Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Well # Company Permit # Surf Loc Btmhole Loc Prudhoe Bay Unit R-39A BP Exploration (Alaska), Inc. 96-084 623~SL, 4382~VEL, Sec 32, T12N, R13E, USVI 4488~SL, 165~VEL. Sec 06. TllN, R13E, UM Dear Mr Stagg: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David 'q~. Johnston Chairman~ BY ORDER OF THE COMMISSION ljb/encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA --_ ALASKA AND GAS CONSERVATION CC IISSION PERMIT TO DRILL 20 AAC 25.0O5 la. Type of work Drill [] RedrillFIIlb. Type of well. Exploratoryl-I Stratigraphic Test l-I Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE=48.80 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612, Anchoraqe, Alaska 99519-6612 28282 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 623' NSL, 4382" WEL, Sec.32, T12N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 359' NSL, 966' WEL, Sec 31, T12N, R13E R-39A 2S100302630-277 At total depth 9. Approximate spud date Amount 4488'NSL, 165' WEL, Sec. 6, T11N, R13E May 1, 1996 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in properly 15. Proposed depth (MD and mVD) property line 28279 @792 feet no close approach feet 2560 10729' (8840'TVDss) feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ,&AC 25.035 (e)(2)) Kickott depth ~o729, MD feet Maximum hole angle 9,~ 0 Maximum surface 3330 pslg At total depth (TVD) 8840' pslg 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length M D TVD M D TVD (include stage data) 3 3/4" 2 7/8" 6.16# L-80 FL4S 380' 10350 8759 10729 8840 uncemented slotted finer 19. To be completed for Redrill, Re-entry, and Deepen Operations. /~Pi'~, 9 ''¢ , ..... '" Present well condition summary "": .... '~ ~:':~:-;~ Total depth: measured 10395 feet Plugs (measured) true vertical 8814' feet ,...,~. i',.1'._,.,~ o-,.j., Effective depth: measured 10375 feet Junk (measured) true vertical 8815 feet Casing Length Size Cemented Measured depth True Vertical depth Structural BI. CB Conductor 110 20" 260 sx Articset 157 157 S u r fa c e 2414 10 3/4" 1364 sx 2451 2433 In term ed iate 9279 7 5/8" 680 sx class G 9316 8741 Production Liner 1175 4 1/2" uncernented liner 9200-10375 8696-8817 Perforation depth: measured Slottedliner 9295;10352' true vertical Slottedliner8733'-8816' 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsl-I 21. I hereby certify tl~t~.e foregoing is true and correct to the best of my knowledge Signed ~~ Tit le Coiled Tubing Drilling Engineer Date 4/24/96 ( / ¢'/'~ Commission Use Only 'Permit Number APl number IApprova, I date See cover letter C,:~' _ ~ 5 0- o~.. ~ --- ~, .2,.._~'~.~' o / I ,-~/'/ //~ (~ for other requ rements Conditions ofapp'roval Samples required [] Yes~ ¢1~ No Mud Icg required [] Yes 1~ No Hydrogen sulfide measures ,~3 Yes [] No D~rectional survey required ~:l Yes [] No Required working pressure for DOPE 1-12M; r-13M; I-ISM; I-I10M; I-]15M; Other: dr~g~na! Signed By by order of Approved by David W. Johnston Commissioner me commission Date~'///~ Ii Form 10-401 Rev. 12-1-85 Submit in t¢ sate BPX R-39 Sidetrack Summary of Operations: Well R-39 is suffering from Iow Kv/Kh that hinders vertical sweep. The horizontal production interval of this well is being extended through Zone 4 to improve vertical sweep. Drill Directional Hole: Planned for May 1 - May 7, 1996. - Directional drilling coil tubing equipment will be rigged up and utilized to drill the directional h°le as per attached plan to planned TD of 10,729' MD (8840' TVDss). Mud Program_' - FIo-Pro (8.8--8.9 ppg) Casing Program - 2 7/8", 6.16#, L-80, FL-4S Slotted liner will be run from TD to approx. 10,350' MD. Well Control: - See attachments. - Drilling operations will utilize the fully lubricated system shown in the attached diagram. The production liner will be run using the 4-ram and annular preventer system shown in the attached diag ram. - Pipe rams, blind rams and the CT pack-off will be pressure tested to 400 psi and to 4000 psi. - The annular preventer will be tested to 400 psi and 2000 psi. Directional - See attachements. Existing shoe to be drilled out: 10,375' MD (8757' TVD ss) - TD: 10,729' MD (8840' TVD ss) Magnetic and inclination surveys will be taken every 25 ft. No gyro will be run. Logging - A Gamma Ray log will be run over all of the open hole section while drilling. - A Gamma Ray/Induction/Sonic log will be run on CTE prior to running the liner. .... R-39 Proposed Sidet ~' ~'~k TREE: 4-1/16"-SM ClW WELLHEAD: 10-3/4" - 5M FMC ACTUATOR: BAKER KB. ELEV = 60.03' @F. ELEV = 22.97' GL. ELEV = 19.60' 10-3/4", 45.5#/ft,I NT-80 Butt 2,451' LONG STRING 7-5/8" , 29.7# NT95HS NSCC NOTE- Tight spot @ 6633' WLM. ( 6-15-95 ) Sweged out 3.805" KOP' 40°- @ 8,900' MAX ANGLE: 940- @ 10,395' ANGLE at TD @ 94°- 4-1/2", 12.6#/ft, NT13Cr-80, NSCT, TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT LANDING NIPPLE I (HES)( 3.813" ID) 2~112' CHROME TBG & LINER Camco, KBMG-M , GLM f 4,5" WI 1" BK LATCH! No I MD(EKE) TVDss I s I 3,0so: 2,995' S I 5,253, 5,051' 4 I 6,524, 317,542 218,377' 118,923. 6,235' 7,194' 8,012' 8,522' IAng 26124 20 22 HES X-NIPPLE (3.813"1D) I 8,972' J LONG STRING 7-5/8" , 29.7# NT95HS NSCC LONG STRING 7-5/8", 29.7# NT95HSNSCC SHOE I 9,316' I 4.5" 12.6# L-80 NSCT SLOTTED LINER 9,295' - 10,352' 7-5/8" x 41/2" Baker "SABL-3" I -- PKR. W/"K'! Anchor Assey. HES X-NIPPLE (3.813"1D) I HES XN-NIPPLE (3.725"1D) CT-GR/CCLMD 4-1/2" WLEG CT-GR/CCLMD 7-5/8" X 4-1/2" TIW" SS" HORIZONTAL Packer W/Scoop Top 8,984' 9,007' 9,018' 9014' 9,030' 9025' I 9'208'I PBTD 4.5", 12.6 #/ft, L-80 NSCT, 11o,375'1 0,375' Proposed 3 3/4" Open Hole ~. ~,1,,, t.. " ' .... R-39 Proposed Com[-';tion TREE: 4-1/16"-5M ClW WELLHEAD: 10-3/4" - 5M FMC ACTUATOR: BAKER KB. ELEV = 60.03' BF. ELEV = 22.97' GL. ELEV = 19.60' 10-3/4", 45.5#/ft, NT-80 Butt I 2,451 LONG STRING 7-5/8", 29.7# NT95HS NSCC NOTE: Tight spot @ 6633' WLM. ( 6-15-95 ) Sweged out 3.805" KOP: 40-0 @ 8,900' MAX ANGLE: 94-0 @ 10,395' ANGLE at TD @ 94°- 4-1/2", 12.6#/ft, NT13Cr-80, NSCT, TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT LANDING NIPPLE (HES)(3.813"1D) I 2,112' I CHROME TBG & LINER Camco, KBMG-M , GLM f 4.5" W/1" BK _ATCH) MD(BKB) 3,050' 5,253' 6,524' 7,542' 8,377' 8,923' TVDss [Ang 5,051' 20 6,235' 22 7,194' 8,012' 8,522' 136 HES X-NIPPLE (3.813"1D) I 8,972' I LONG STRING 7-5/8", 29.7# NT95HS NSCC 7-5/8" x 41/2" Baker "SABL-3" PKR. W/"K" Anchor Assey. HES X-NIPPLE (3.813"1D) HES XN-NIPPLE (3.725"1D) CT-GR/CCLMD 8,984' 9,007' 9,018' 9014' 9,030' 9025' 9,208' LONG STRING 7-5/8", 29.7# NT95HSNSCC SHOE 9,316' 4.5" 12.6# L-80 NSCT SLOTTED LINER 9,295' - 10,352' 4-1/2" WLEG CT-GR/CCLMD 7-5/8" X 4:1/2" TIW" SS" HORIZONTAL Packer W/Scoop Top PBTD I 10,375'1 4.5", ~2.s #~t, L-8o NSCT, I 10,375' Proposed 2 7/8" slotted liner Proposed 3 3/4" Open Hole R-39 2OO 8680 87OO 872O 874O 876O 878O 8800 882O 884O 8860 4O0 Vertical Section 600 Path Distance (Feet) 800 1,000 1,200 I I I 1,400 1,600 1,800 I I I ,TSAD,-~- ...................... Igle @ K.O.= 92 deg M D: 10395 8~ deg DL 1= 10 deg/100 DL 2= 10 deg/100 72 deg :": 3= 10 ,' t ! ,8,840 1 o729 TD Tot Drld:334 ft Marker Depths @Oriq Wellbore TSAD 8,84oJ 8,840Jrt TVD I Kick Off Deprtr @KO J 8,757Jrt TVD 10739Sift MD 1~724 ft 10,395I 334I 10~729I 8~8421 MD KO Pt M D New Hole TOtal MD TVD TD Build Rt deql100 MD (ft) - o.o -10.0! 100 -10.0 131 0.0 1 0.1 1 0.1 1 Curve 1 Curve 2 Curve 3 Curve 4 Curve 5 Curve 6 33~ Drown: 3/11/.96 16:14 Plan Name: Case I -1 -39 Plan I~iew ~0 -1500 -1300 -1100 -900 -700 -500 X distance from Sfc Loc -300 -700 -900 -1100 -1300 -1500 -1700 -1900 -2100 IWell Name R-39 CLOSURE Distance 1;767 ft Az 216 deq NEW HOLE Kick Off TD State Plane Surface Loc , E/W (X) N/S "1'2161 '1'!75 I 633~5171 5~975'~658 634,550 5,977,091 Az Ch( MD (ft) 0.0 100 0.0 1 3'1 0.0 1 0.0 1 0.0 I Curve 1 Curve 2 Curve 3 Curve 4 Curve 5 Curve 6 334 Drawn: 3/11/96 16:14 Plan Name: Case 1 Lubricator~ 10,000 psi[ Pack-Off [ CT Sidetrack BOP for 2 7/8" Drilling and Liner Running Operations Blind/Shear Slip Rams Slip Ram Pipe Ram 3/8" hTmmm ~ 2 7/8" J RECEIVED Alaska Oil & WELL PERMIT CHECKLIST PROGRAM: exp [] der redrll~ serv [] wellbore seg [] oN/oFF SHO ADMINISTRATION ENGINEERING GEOLOGY 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............ 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party ............. 10. Operator has appropriate bond in force ........ 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... N N N N N N · Y N · ~ ~S 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Conductor string provided ................ Y N Surface casing protects all known USDWs ......... Y N CMT vol adequate to circulate on conductor & surf csg. . Y N CMT vol adequate to tie-in long string to surf csg · · . Y N CMT will cover all known productive horizons ....... Y Casing designs adequate for C, T, B & permafrost ..... Y N ~//~/~ Adequate tankage or reserve pit ............. ~ N If a re-drill, has a 10-403 for abndnmnt been approved. .Y N Adequate wellbore separation proposed .......... ~ N If diverter required, is it adequate ........... ~Y N Drilling fluid program schematic & equip list adequate . Y~ N BOPEs adequate ..................... ~ N BOPE press rating adequate; test to ~~ psig. N Choke manifold complies w/API RP-53 (May 84) ...... .~x~ Work will occur without operation shutdown ....... ~ N Is presence of H2S gas probable ............ ~ N / 30. Permit can be issued w/o hydrogen sulfide measures .... Y N 31. Data presented on potential overpressure zones ..... 32. Seismic analysis of shallow gas zones .......... . . condition off-shore) 33 Seabed survey (if ....... /Y 34. Contact name/phone for weekly progress reports . . ./.. Y N [exploratory only] GEOLOGY: ENGINEERING: BEW Comments/Instructions: HOW/ljb- A:\FORMS~cheklist rev 11195 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ..9G6[ l ~ AON * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : B.P. EXPLORATION WELL NAME : R-39A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE BOROUGH STATE : ALASKA API NUMBER : 50-029-22526-01 REFERENCE NO : 96240 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1996 u~:49 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE · 96/11/25 ORIGIN : FLIC REEL NAME : 96240 CONTINUATION # PREVIOUS REEL COP~qENT · B.P. EXPLORATION, PRUDHOE BAY R-39A, API #50-029-22526-01 **** TAPE H~ER **** SERVICE NAME : EDIT DATE : 96/11/25 ORIGIN · FLIC TAPE NAME : 96240 CONTINUATION # : 1 PREVIOUS TAPE : CO1PqENT . B.P. EXPLORATION, PRUDHOE BAY R-39A, API #50-029-22526-01 TAPE HEADER PRUDHOE BAY MWD LOGS WELL NAIVE: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NOY4BER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL : FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING R-39A 500292252601 BP EXPLORATION SCHLUMBERGER WELL SERVICES 25-NOV-96 BIT RUN1 ......... 96240 KEMP/TZVETCO WHITLOW BIT RUN 2 BIT RUN 3 .................. 32 12N 13E 623 4382 60.00 60.00 19.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3. 750 7. 000 10380.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1996 0~:49 3RD STRING PRODUCTION STRING SLIM1 MWD GR DATA ACQUIRED 21 TO 23 JUN 1996. NO DEPTH SHIFTS APPLIED TO THIS DATA AS PER S. JONES. DATA WAS INTERPOLATED AT AK ICS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE1FUMBER: 1 EDITED ~iERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCRE~ENT: O. 5000 FILE SO?4MARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 10363.0 10741.0 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: DATA FROM MERGED RUNS ONE AND TWO ACQUIRED 21-23 JUN, 96 NO DEPTH SHIFTS APPLIED AS PER S. JONES. $ -EQUIVALENT UNSHIFTED DEPTH .......... BIT RUN NO. MERGE TOP MERGE BASE 1 10363.0 10405.0 2 10405.0 10741.0 LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center '25-NOV-1996 0~:49 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX) DEPT FT NA O0 000 O0 0 1 1 1 4 68 0000000000 GRRWMWD AAPI NA O0 000 O0 0 1 1 1 4 68 0000000000 GRIN MWD AAPI NA O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR NA O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10741.000 GRRW. MWD -999.250 GRIN.MWD -999.250 ROP.MWD DEPT. 10364.000 GRRW.MWD 76.470 GRIN.MWD 76.470 ROP.~D 68.000 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1996 0~:49 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 96/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10363.0 10741.0 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE '. TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR G~ RAY $ 23 -JUN-96 5.5 5.5 REAL - TIME 10748.0 10363.0 10741.0 0 64.6 91.8 TOOL NUMBER SLIM1 169 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1996 0~:49 PA GE: BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): LIS FORMAT DATA 3. 750 10380.0 FL 0 - PRO 8.80 74.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1996 07:49 PAGE: 6 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT NA O0 000 O0 0 2 1 1 4 68 0000000000 GR RAW CPS NA O0 000 O0 0 2 1 1 4 68 0000000000 GR MWD AAPI NA O0 000 O0 0 2 1 1 4 68 0000000000 GR INT AAPI NA O0 000 O0 0 2 1 1 4 68 0000000000 ROP MWD F/HR NA O0 000 O0 0 2 1 1 4 68 0000000000 ROPSMWD F/HR NA O0 000 O0 0 2 1 1 4 68 0000000000 ROP5 INT F/HR NA O0 000 O0 0 2 1 1 4 68 0000000000 VDEPMWD FT NA O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. ROP.MWD 10741.000 GR.RAW -999.250 GR.MWD -999.250 GR.INT -999.250 77.400 ROPS.MWD 68.000 ROPS.INT 68.000 VDEP.MWD 8838.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : 0 O1 CO1 DATE : 96/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 96/11/25 ORIGIN · FLIC TAPE NAlV~E : 96240 CONTINUATION # : 1 PREVIOUS TAPE : COFk4~NT : B.P. EXPLORATION, PRUDHOE BAY R-39A, API #50-029-22526-01 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1996 0~:49 PAGE: **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 96/11/25 ORIGIN : FLIC REEL NA~E : 96240 CONTINUATION # '. PREVIOUS REEL : CO~iENT : B.P. EXPLORATION, PRUDHOE BAY R-39A, API #50-029-22526-01