Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
196-089
Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 12/04/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20251204 Well API #PTD #Log Date Log Company Log Type AOGCC E-Set# PBU 05-04A 50029201520100 196089 10/30/2025 BAKER RPM PBU F-18B 50029206360200 225099 11/4/2025 BAKER MRPM END 1-39A 50029218270100 206187 11/20/2025 READ PressTempSurvey END 1-55 50029217880000 188021 11/26/2025 READ PressTempSurvey END 1-57 50029218730000 188114 11/18/2025 READ CaliperSurvey END 1-63 50029219050000 189006 11/23/2025 READ PressTempSurvey END 1-65A 50029226270100 203212 11/29/2025 READ PressTempSurvey END 2-18 50029220320000 190043 11/19/2025 READ PressTempSurvey END 2-20 50029220480000 190060 11/24/2025 READ PressTempSurvey END 2-32 50029220840000 190119 11/30/2025 READ PressTempSurvey END 2-46B 50029219210200 197137 11/21/2025 READ PressTempSurvey NCI A-13 50883200870000 192106 11/27/2025 READ Caliper Survey NS-33A 50029233250100 208189 5/22/2025 READ EVCamera Please include current contact information if different from above. T41175 T41176 T41177 T41178 T41179 T41180 T41181 T41182 T41183 T41184 T41185 T41186 T41187 PBU 05-04A 50029201520100 196089 10/30/2025 BAKER RPM Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.12.05 11:03:29 -09'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 05-04A Patch Perforations Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 196-089 50-029-20152-01-00 12338 Conductor Surface Intermediate Liner Liner 9060 82 2669 9111 3373 9857 20" 13-3/8" 9-5/8" 7" x 4-1/2" 8913 26 - 108 26 - 2695 24 - 9135 8965 - 12338 26 - 108 26 - 2695 24 - 8432 8274 - 9060 12035 520 1140 4760 5410 / 7500 9857 , 9861 , 9901 , 10700 1530 5020 6870 7240 / 8430 9114 - 12190 4-1/2" 12.6# L-80 22 - 8939 8411 - 9035 Structural 4-1/2" Baker S-5 8207 8893 8207 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028326 22 - 8250 140 1578 20788 28152 6 48 0 0 968 938 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV 8893 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:20 am, Sep 03, 2024 Digitally signed by Aras Worthington (4643) DN: cn=Aras Worthington (4643) Date: 2024.08.29 13:27:46 -08'00' Aras Worthington (4643) RBDMS JSB 091124 DSR-9/11/24WCB 10-3-2024 ACTIVITYDATE SUMMARY 8/4/2024 T/I/OA= 2450/200/200 *****Assist E-Line****** Pumped 148 bbls down TBG to assist E-Line in getting to depth, FWHP's=300/200/200 E-Line in control of Well upon depature. 8/5/2024 *** JOB CONTINUE FROM 8/04/2024 *** (PACKER SET) RIG UP YJ ELINE PT PCE 300PSI LOW/ 3000 PSI HIGH SET NS LOWER PATCH WITH ME AT 9150'. TOP OF PACKER AT 9138', BOTTOM OF PACKER AT 9157' CCL-ME=23.7', CCL STOP=9126.3'. TAG AFTER SET LOG CORRELATED TO SLB PERFORATION RECORD DATED 18-MAR-17 RDMO YJ ELINE ***WELL SHUT IN ON DEPARTURE*** READY FOR SLICKLINE 8/6/2024 ***WELL S/I ON ARRIVAL*** RAN 3.68" CENTRALIZER TO LOWER PATCH @ 9,138' MD SET NORTHERN SOLUTIONS 450-368 UPPER STRADDLE (snap latch btm, 29.4' lih, 3.68" od @ packer, 2.37" id) @ 9,138' MD. Top of Patch @ 9109' MD. ***WELL LEFT S/I ON DEPARTURE*** Daily Report of Well Operations PBU 05-04A @ SET NORTHERN SOLUTIONS 450-368 UPPER STRADDLE (snap latch btm, 29.4'( lih, 3.68" od @ packer, 2.37" id) @ 9,138' MD. Top of Patch @ 9109' MD. SET NS LOWER PATCH WITH ME AT 9150'. BOTTOM OF PACKER AT 9157' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 05-04A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 196-089 50-029-20152-01-00 12338 Conductor Surface Intermediate Liner Liner 9060 82 2669 9111 3373 9857 20" 13-3/8" 9-5/8" 7" x 4-1/2" 8913 26 - 108 26 - 2695 24 - 9135 8965 - 12338 26 - 108 26 - 2695 24 - 8432 8274 - 9060 12035 520 1140 4760 5410 / 7500 9857 , 9861 , 9901 , 10700 1530 5020 6870 7240 / 8430 9114 - 12190 4-1/2" 12.6# L-80 22 - 8939 8411 - 9035 Structural 4-1/2" Baker S-5 8207 8893 8207 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028326 22 - 8250 140 1578 20788 28152 6 48 0 0 968 938 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV 8893 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:36 am, May 13, 2024 Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.05.10 07:14:31 - 08'00' Eric Dickerman (4002) WCB 7-16-2024 RBDMS JSB 051524 DSR-5/13/24 ACTIVITYDATE SUMMARY 3/18/2024 ****** WELL SHUT IN ON ARRIVAL ****** DRIFTED WITH 22' DUMMY GUN (3.66" OD) DOWN TO 8,980' SLM *** COULDN'T PASS THROUGH *** DRIFTED WITH 22' DUMMY GUN (3.16" OD) DOWN TO 9,820'SLM *** MADE DEPTH TAPPING TOOLS THROUGH *** *** CONTINUE WSR ONTO 3/19/24 *** 3/19/2024 *** CONTINUED WSR FROM 3/18/24 *** BRUSHED WITH 3.25" GAUGE RING DOWN TO 9,832' SLM DRIFTED TO 9,832' SLM WITH 22' DUMMY GUNS (3.16" OD) *** WELL SHUT IN ON DEPARTURE *** 4/6/2024 ***WELL S/I ON ARRIVAL*** OBJECTIVE: PERFORATE INTERVAL W/2 7/8'' GEO GUN 6 spf 60 DEG PHASE RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH RIH WITH GUN#3 W/CH/2.75'' GUN GAMMA/20' OF 2 7/8'' GEO RAZOR GUN TO PERFORATE INTERVAL 9678'-9698' WITH 2 7/8'' GEO RAZOR TOOL CAN'T PASS TROUGH 9624.6' MD AFTER MULTIPLE ATTEMPTS AT DIFERENTS SPEED TOOL KEPT SITTING DOWN AT 9624.6' MD INCOMPLETE OPERATION ***WELL S/I ON DEPARTURE*** 4/7/2024 ***WELL S/I ON ARRIVAL*** PERFORM WELL CONTROL & EVACUATION DRILL w/ DAY CREW & WSS RAN 3.48" GAUGE RING w/ 4-1/2" BRUSH, BRUSHED FROM 9,550' - 9,800' FOR 30 MINUTES FOCUSING ON 9,591' SLM, SITS DOWN @ 80 FPM, 100-120 FPM DOES FINE, SAME RESULTS AFTER 30 MINUTES DRIFT w/ 22' x 2-7/8" DUMMY GUNS (max od = 3.16"), MADE CLEAN PASSES @ 25, 50, 100 & 150 FPM TO 9,750' SLM ***WELL S/I ON DEPARTURE*** 4/12/2024 *** WELL S/I ON ARRIVAL*** OBJECTIVE: PERFORATE INTERVAL W/2 3/4" GEO RAZOR GUN 6 spf 60 DEG PHASE MIRU YELLOW JACKET E-LINE. PT PCE 300 PSI LOW./3000 PSI HIGH RIH W/CH/2 3/4'' GUN GAMMA/20' OF 2 3/4'' GEO RAZOR GUN 6 spf 60 DEG PHASE TO PERFORATE INTERVAL 9678'-9698' TAGGED HIGH AT 9624' MADE MULTIPLE ATTEMPTS POOH RIH W/CH/2 3/4'' GUN GAMMA/10' OF 2 3/4'' GEO RAZOR GUN 6 spf 60 DEG PHASE TO PERFORATE INTERVAL 9688'-9698' CCL TO TOP SHOT= 7.6' CCL STOP DEPTH= 9680.4' TAGGED HIGH AT 9624' POOH ADDED BOTTOM CENTERLIZER TO GUN STRING RIH W/CH/2 3/4'' GUN GAMMA/10' OF 2 3/4'' GEO RAZOR GUN 6 spf 60 DEG PHASE TO PERFORATE INTERVAL 9688'-9698' CCL TO TOP SHOT= 7.6' CCL STOP DEPTH= 9680.4' TAGGED HIGH @ 9624' POOH SD FOR HIGH WINDS, 34 MPH, LUBE LAID DOWN. *** REPORT CONTINUED ON 13 APRIL 2024 *** Daily Report of Well Operations PBU 05-04A Daily Report of Well Operations PBU 05-04A 4/13/2024 *** CONTINUED FROM 13 APRIL 2024 *** STANDY ON WIND >30 MPH. PT PCE 300 PSI LOW./3000 PSI HIGH GAMMA RAY LOG CORRELATED TO SLB PLUG AND PERFORATION LOG DATED 18-MAR-2017 RIH W/CH/1.69'' GUN GAMMA/10' OF 2'' GEO RAZOR GUN 6 spf 60 DEG PHASE TO PERFORATE INTERVAL 9688'-9698'' CCL TO TOP SHOT= 6.7' CCL STOP DEPTH=9681.3'' GUN 2 RIH RIH W/CH/1.69'' GUN GAMMA/10' OF 2'' GEO RAZOR GUN 6 spf 60 DEG PHASE TO PERFORATE INTERVAL 9678'-9688'' CCL TO TOP SHOT= 6.7' CCL STOP DEPTH=9671.3' JOB COMPLETE ***WELL S/I ON DEPARTURE*** Adperfs are correctly shown on the new WBS, below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y Samantha Carlisle at 12:08 pm, May 04, 2022 'LJLWDOO\VLJQHGE\%R<RUN '1FQ %R<RUN RX 8VHUV 'DWH %R<RUN $&7,9,7<'$7(6800$5< :(//6,21$55,9$/ SURILOHPRG '5,)77%*Z [%$,/(581$%/(723$66'2*/(*# 6/0 a '5,)77%*72&,%3# 0'Z*5,1*QRLVVXHV 5$1 [''%$,/(581$%/(723$66'2*/(*# 6/0 5$1 [''%$,/(581$%/(723$66'2*/(*# 6/0 -2%&217,18('21:65 -2%&217,18(')520:65 SURILOHPRG 5$1 ['800<*81672&,%3# 0'QRLVVXHJRLQJWKUXGRJ OHJV -2%&203/(7(:(///()76,21'(3$5785( :(//6,21$55,9$/'62127,),(' SOXJGXPSEDLOFHPHQW 6,7'2:1217+(/73$7 &+$1*(287721(:3/8*:,7+$0$&+,1('5281'('%27720 /26(&2006$7:+,/(5,+7528%/6+227 -2%72&21721$35 &217)520$35VHWFLESGXPSEDLOFHPHQW 6(71257+(5162/87,216&,%30,'(/(0(17$7 &&/720,'(/(0(172))6(7 &&/6723'(37+ '803a 2)&(0(17217232)3/8*72& 7,(,1726/%3/8*6(77,1*$1'3(5)25$7,1*/2*'$7('0$5 -2%&203/(7(:(///()76,$1'7851('29(572'62 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8$ STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMIS N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations Q Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program �❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: el Be LrJ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 196-089 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20152-01-00 7. Property Designation(Lease Number): ADL 0028326 8. Well Name and Number: PRUDHOE BAY UNIT 05-04A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 12337 feet Plugs measured 9901/10700 feet true vertical 9060 feet Junkmeasured 12035 feet APR 0 6 2017 Effective Depth: measured 9901 feet Packer measured 8895 feet true vertical 8930 feet Packer true vertical 8206.56 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 82 20"94#H-40 26-108 26-108 1530 520 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 22-8941 22-8250 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED MAY 16 2017 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 449 37877 0 100 552 Subsequent to operation: 692 3622 16 125 481 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature iG I c^--- Phone +1 907 564 4424 Date 4/6/17 Form 10-404 Revised 5/2015 /4,0y/41/%7 Pen= 57i'>f/7 RBDMS 1.,\✓ APR - 7 2017 Submit Original Only • • a) • 0• 0 0 0 0 0 0 0 0 0 - 18 0 (c:=0) N- 0 t 0 0 • N Cn LC) NrLU CC) U y 0 0 0 0 0 0 0 0 0 0 Sp. C") N CO C!) Ln N- Ln M Cr) • CC) C) Cr) — '— CO — N Nr CO CC) CC) CO CO CO CO N- co co O Lr) co N L 0 0 N— O) CO N CO CO 0) CO C() CO CO N- CO CO t N O N N N N LO co co co O) co i i I I H O) O C1) CO in CO Co N— V O N 00 N- 0) N N N CO N N- CO CO N N N N N LU CO CO CO •F0 Q w a0) LO O (.0O N- O) E ,L00 (O CO O N O CO- CO) coV CO (flCA N O -C O N N N O N- O 00 00 i i i i +-' Z QCA O CO 6) O) CO CO — t CO O 0) CO CO N N N CO N N- N N— CA (3) N _ }. N N CO f— CO CO • • • WO CC) O LU O O O O C0 d) , coo) O0 (0 8)Z � ZZuh ° O?ZZJ cm i *CD CO k O Z c0 C0 • O N r N- 1# N N CO (I) O0) - N U Ce p M CO 6, a0 00 (V N iLo C? O 0) C)) d' -4- CO Cr) N- LO CO CA d)N O) CO Cr) t Cr) N LU C CO In N- N- "(Zr O7 O) N CO O C) N N C`') O CO CO J W W W W H I— < H H Cr)O Q Q Q .17 • O w w o 0 w w U a co a_ C CCrIZ Z W W W W W W m O D D H H H H Z Z D Z Z Z Z J J H • • a> �o CO I, LU V N V CO CO N r 0) 0) CO L N O (O 00 CO M o CO LU O Q O N N M M 4 co 00 N If) CM In O0) 000OCO CD NNM O 0 LU 0) O O O O o 0 0 0 0 0 0 p 00 0) 0 0) 0) 0) 0) 0) 0) 0) 0) > F Q O M M v- Lo CO N- Ln L1) N r N- t O O Lo 0 0 Lf) O M N 0 f: O id M N R Ni O Ln ❑ • r Lo co O o 0 0 0 0 o r N N N W 0 0) 0) C O O O o CD o o C) 0 0 > p co co W 0) 0) 0) 0) 0) 0) o) 0) 0 I- w ❑ ❑ ❑ W Z Lu w 0 W 0 F- H- J a W g Y v 0 O a m O O W 0 2 O O O O O Ln Ln 2 o 0 0 0 - - -� U ) w w w 0) M O P. O 0 t[) if) 0) J J J Q Q (n ice+ a 0 r O CO 0) r CO CO N- 0) r < < < W a a z �1C^�+ 0 550) LC) C O O o 0 0 o r r r r r (V U_ U_ Z 0_ O J W W W r r r r r r r r r r r r Z Z J J ❑ J ILL/ CI- t V Dez z000a p Z 222Ocnco co co co Q Q cM< d oC000lnoCLUOlDoo O M N- O LC) N- N N N Ln N- O r o 1.1.1 •r 'cri0 r LC) N- CO o N N- 00 O p 0) 0 0 0 0 0 o C) r r r r r Cy W yr _ E - - Y = 0 0 co J a • Q 2 2 2 0 cn u) cn cn cn CD a3 .2 u_ cou) u) u) u) Ccococo ( C �a a_ a_ a_ a a_ a a a a a_ a_ a a_ 0 dQmmmmmmmmmmmmm a. 0 a, a) a m Q N- N- ❑ O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W Z O N N N N N N N N N N N N N N Z LL < 11 W 00 00 8 00 O O O O O 00 00 O O 8 g W ❑ J JJ ❑ W CC Z a J 0 JJ W W LL W O ❑ -J M C) M M M M M M M M M M M M mw -1 -10 ::7 Cl' W W < < a cn LL LL .) LL cn a G_ a E ca Z Q Q Q Q Q Q Q Q Q Q Q Q Q Q NrNr ":rNI- NI- NI- vvvvNI- .1rNI- Nr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � i i i i i i t i i i i i i i LL a (n O LL N a LL Ln In Ln Ln Lf) Ln Ln Ln LU L() L() Ln Ln Ln 0301. 0_ 12_ 0 _, a a a 0 J 00Wa 0 000 0 0 00000000 < < CO CO LL w cn C/) a LY • • Packers and SSV's Attachment PRUDHOE BAY UNIT 05-04A SW Name Type MD TVD Depscription 05-04A TBG PACKER 8894.5 8206.56 4-1/2" Baker S-5 Packer 05-04A PACKER 8966.98 8274.22 7" Baker ZXP Packer • 0 \ E \ / Z co• 2 0 � Q © E 0 ƒ 0 To 0 0) § / 0. \ 3 » L 0 2 C 0, CO cri < 0 E _C R I I I 2 m $ 0 0E ƒ 0 = E < y >< % 0 z \ O Q -o / / b / a 2co a k = P : �� 3 b u i ? m \/ \ 19 a ° 2 2 o $ 2 § * £ § R O o- < / e 0 co = f \ \ a , k 6 k CD 0 \ C * Li 0 / 0H 0 / / / O � / / \ � ƒ� / / / - \ / \ / $ R 22 t % D \ / \ � r < �_ ƒ ƒ / 0_ * u $ O O a _J 0 � Q / £ / _.z O ' - OO 0 � \ / Q CO H * m 3 a ~ � _1 a_ ƒ \ fx i— t W / O .$ \ CO / 2 / / 2 \ / = N2k0 a 2 "c - 3 o , 0 0 / \ ( / / / i k ƒ \ (2 p E / / / : O R O O > I m 0 & 2 2 / . II G 9 < 7 10 O E \ $ I- E \ / \ / isi 61- a (» < u e 2 I O 0 R \ r \ i O 2 O & ± t CI \ > \ _0\ < \ \ 4 E Q b u' r \ Z E E I - a % $ gC \ Z6 _% / @m / QOU 0 ® / 2 \ ± / F Z Z O \ o a p 2 / ± R R I k / / \ / f / \ R ± o ƒ * - \ / ƒ $ ff / 0 � k \ CN II 7o- / � 1- `- \ Ew / � E / / / o_ / / ko � f > - / \ / - DWOLUDUiIOO O0 / ff & —m & _ ± ; & ± m _1 -3 W 0_ co _, _1 : : 0 cC : O 2 0 L \ » » N- ¥ H / \ \ / A— no 5 # _ = a c ® p / / \ \ < TREE 4-1/8"owFLS •WELLHEAD= FMC 05-04A SAFETY NOTES: WELL ANGLE>TO°@ 9963'*** ACTUATOR= BAKER C OKB.ELEV= 69' I I BF ELEV= KOP= 2910' Max Angle= 96°@ 10361' L�2201' —4-1/2"CAMCO BAL-O SSSV NIP ID=3.812" Datum MD= 974(Y Datum TVD= 8800'SS _"CONDUCTOR, —{ ? /2 GAS LFT MANDRELS 13-3/8"CSG,72#,MN-80,D=12.347 {— 2700' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 4027 3947 30 MMG DMY RK 0 10/14/12 2 7733 7157 29 MM3 DMY RK 0 10/14/12 3 8865 8179 21 MG DMY RK 0 12/12/97 Minimum ID = 3.725" @ 8917' 4-1/2" HES XN NIPPLE g 8893' H9-5/8"X 4-1/2"BKR S-5 PKR,ID=3.856"/ I I 8917' i--[4-1/2"HES XN NP,D=3.725" I 4-1/2"TBG, 12.6#,L-80 IBT A/B MOD, —`8939' - ' ` 8938' —{4-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958' ) —I ELM)TT NOT LOGGED TOP OF 4-1/2'LNR — 8965' -- L 8966' 1—L9-5/8"X "BKR LTP&HMC HGR,ID=6.25" 1 X—I 8985' —17"X 5-1/2"XO,D=3.958" -------{ 8987' H5-1/2"X 4-1/2"XO,D=3.938" MILLOUT WINDOW(05-04A) 9135- ' TOP OF WHIPSTOCK — 9135' 9901' 1—4-112"CIBP(03/18/17) [9-5/8"CSG,47#,N-80,D=8.681" J—[ -9136 PERFORATION SUMMARY �% 10700' —{WFD CUP(01/16/16) REF LOG:CNL ON 11/30/97 ►'(VV I I�••••4 , ANGLE AT TOP PERF:22°@ 9114' ►iQtit:titiQQti Note:Refer to Reduction OB for historical perf data /// ` SIZE SPF INTERVAL Opn/Sqz SHOT SQZ / ` 12035'CTMD —4-1/2"CBP MLLED 3-3/8" 6 9114-9144 0 03/18/17 , &PUSHED DH 2-1/2" 3 9979-9994 C 11/24/16 2-7/8" 6 10070- 10090 C 07/16/07 (03/19/14) 2-7/8" 6 10100-10130 C 07/15/07 2-3/4" 4 10450-10500 C 12/08/97 2-3/4" 4 10570-10670 C 12/08/97 2-3/4" 4 10725-10800 C 12/08/97 2-3/4" 4 10820-10995 C 12/08/97 2-3/4" 4 11020- 11155 C 12/08/97 2-3/4" 4 11255- 11355 C 12/08/97 ..- 2-3/4" 4 11460-11670 C 12/08/97 .x r.= diroaricir 2-3/4" 4 11710-11750 C 12/08/97 FBTD H 12253' _.->/=ir- 2-3/4" 4 11870-11950 C 12/08/97 _ir : 2-3/4" 4 12000-12190 C 12/08/97 4-1/2"Lt4t,12.6#,N-80 BT A/B MOD, — 12338' .0152 bpf,ID=3.958" — DATE REV BY COMvU'ffS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/16175 INITIAL COMPLETION 03/21/17 NLW/JM)SET CBP(03/18/17) WELL 05-04A 12/10/97 SIDETRACK(05-04A) PERMIT Na: 1960890 01/23/01 Ski-MJ FLJAL AR No. 50-029-20152-01 02/04/02 RN/TP CORRECTIONS SEC 32,T11 N,R15E,2262'FSL&1184'FWL 01/26/16 RRW/JMD SET C1BP(01/16/16) 11/29/16 DLS/JND ADPFRFS(11/24/16) BP Exploration(Alaska) STATE OF ALASKA IllkLASKA OIL AND GAS CONSERVATION COMMIS N REPORT OF SUNDRY WELL OPERATIONS6 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operation@ h 1►d#r8 2016 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 6-/ R.i C ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 196-0891 3. Address: P.O.Box 196612 Anchorage, Development II Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20152-01-00 7. Property Designation(Lease Number): ADL 0028326 8. Well Name and Number: PRUDHOE BAY UNIT 05-04A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12337 feet Plugs measured 10700 feet true vertical 9060 feet Junk measured 12035 feet Effective Depth: measured 10700 feet Packer measured 8894.5 feet true vertical 9004 feet Packer true vertical 8206.56 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 82 20"94#H-40 26-108 26-108 1530 520 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 22-8941 22-8250 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED MAR 0 9 20i7, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 100 6000 0 60 350 Subsequent to operation: 733 27404 0 380 367 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development f3 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil f7J Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature !e,f,,.,.) Phone +1 907 564 4424 Date 12/28/16 ti/2.- '7-/iL/17- q Form 10-404 Revised 5/iC 6� RB©MS l'\/ DEC 2 9 29 I6 O R I G I N A L Submit Original Only • • a) a()• o o 0 CD 0 0 0 0 0 co El `r 18 CO 23 P? CO r 0 0 G N O O O O r- r- V CD CD CD CD CD CD CD Cr) N 00 (0 O O- O nr M M • U) O M T- CO - N m 000000 0000 N- 0000 O) Q) O O00 N O O O coCS) O) CO N CO M O) CO to co CO O N- 00 CO N O N N N N O CO 00 CO O) 00 O) O CC) CO nr O CO CO n- nt CO N 00 N- O) N N N CO N CO CO N N N N N0000000 CDC) 000O) N- O) T- 0 E O 0 OO) CO O Cr) Ch M v 0 O CO CV N r— CD O) N O) t p NNNCON- O) 00 CO QZ O) O CO O) N- O) N N CO N N- CD CD( OO) CO O) N CM.. N N CO N- 00 CO 0 to O CO 00 9 CA 00 9 CO ccO �)= ,r Zfn0Z (noZ _j N> > yvCo r- r-O � 03 po - d' V � N _ V a O M ;00 00 -070 p0 N N • M in o C,) CA O) CA Z N CO M N CO O) N U) 77 a) CO N ~ N M O N M co Z Z Z Z C,0 0000 -a 0000000 0OLLU_ 000OCCCLZ Z CC0 0 0 0 W W O m m cccew cez z D . • ar H La CO LO ti cr CO M O N N.. O O Co C (N CO CO - - CO CO c) O CCS LA O p, co N N M M Ni Co M 00 N Ln ch tO m 0) 0) 0 0 0 0 0 0O N N N c7 C0 00) 00000 N00000 p 00 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) a 0 I- co .-- LoCo N- LO V' LO N t 0 U) 0 0) U V co ct 0 M N 0 0. I: cO 6 Ch N ni ni 6 Ln . 4 LA ni 0 Ca Lf) Co 0 0 0 0 0 0 0 v- N N N w p CA 0) 00000000000 > p co co 00 0) 0) 0) 0) CA 0) 0) 0) 0) 0) O 2 w 0 Lr w m Z UJ w H I-a w g g Y U 0 o QtO m N 0 w Y Y CL g O O O O O LO LO Lo O O O O J U U w w w +L+ 0) C'r) O I- O 0) La L0 ti L0 L0 0) J J J ¢ ¢ fn _ CY �+ c a 0) O - Ln Co 00 0) v- CY) Co N- CA - ¢ ¢ ¢ w a a Z C 1 w () 0 0 0 0 0 0 N U U U J J W D J 0 10 y Z Z Z 0 p p J p J p p a W a C F- 2 U U U a W Z ,_w Z o co Z 2 2 2 0 U)) co co N t¢/) Z+ = a Q H C Q L cn OOOO Ln O0 CO 0000 O M 0. N- _O til N- N N N U) (O - N- O Y.1 0 O) 0000000N nr SON 0 L N OI cern 00aJa t 0 O m m m m m aid to' ao_ aLu Lu aaaaaaaEL dQaQaammmmmmmm 0. O t 0 CI. °B 0Co D o o ti CoCoCo CO CoCO CoCO p 0 0 o coa 0 000) 0) 00000000 w Z o N N N N- •- N N N N N N N N Z LL QQ W o NCOLID ODOOCOCOCOCOCOCOCOCO 0 W p J a w ce o. `- I- I'sN N Z J p J J J D Il W IX fl. O CO pD W _ _ ¢ C7 W W ¢ ¢ a u) LL W LL u) a LY 0 E 2 « « « « « « < 30000000000000 N i i i i i i i i i i LL a cn O LL N LY tL LC) a) Ln Ln Ln Ln O Ln Ln Ln Ln (C) Ln m a a 0_ 0 _ a a w a 0000000000000 < ¢ m m w U. cn v) a LY • • Packers and SSV's Attachment PRUDHOE BAY UNIT 05-04A SW Name Type MD TVD Depscription 05-04A TBG PACKER 8894.5 8206.56 4-1/2" Baker S-5 Packer 05-04A PACKER 8966.98 8274.22 7" Baker ZXP Packer � � 0 2 2 0 R , 0 E Z ƒ 2 O 2 O Ce c 0 0 0 �E , < z ƒ 1= w5� � , 0 WCC 02 202 / = m ƒ ƒ _1 • 0_ -J WO m , wm _ 0_ n . < 0 2 1 1 ® 2 b � = c ® 01 % e C00 q � I -I ® - k cQ / w2 bRku 2 / 0 � � z = Nawo '- E to 2 < � / 0 X .. k 0 a E a o m L R I, b > � 02 . m z zw : & « E " w 2w 0 = 3 = 0 2 n< / : ® 0 R 7 _rpm 2 0 = ƒ JCo / M / 0 z 3 f 2 22 m riL o II 0 0 _ Q *- m * • 03 ~ F- _i b o tw / G < >ZE k0_ E ?• 0 00 < CO E� > c) 01 . ... 0 WII C i > » - ƒ ~ E m m m p 2 q , x < O % o w 2 $ / LI q \ ƒ / f \ ® ® 2 E b 0 2 2 2 .. Z q o 0 (31- 0U- d1- 000 -1- < : . ' a. a ,_ @ I ; 0_ 0_ 00 W 2 O m 0 ; K ' � / tu � re / / I w 11 w % 0 O w I- � � ¥ 022 $ % / � q / \ -J 0 2200a- eLL � F c & w W2 / ° � ® R $ SRR = Ew $ / kk - 0 a w < / Dw001- w � oo � wl-LOww0 Cl) * o = / / � / * 2R * = IwW � wW0 ■ : WO : : 0 : : ce : : ceo_ o_ O L CLCCCL : 0 L < CO CO CO CO 0>- k d d 0 U) R 6 CO N > Q . e I w _ N- ,- 0 TREE= LD= 4118"CNY FLS 411 SAFETY NOTES: WELL ANGLE>70°@ 9963'*** VVELFMC ACTUATOR= BAKERC o5-o4a OKB BEV= 69' I 1: BF.EIEV= KOP- 2910' Max Angle= 96 @ 10361' 2201' I-4-112"CA MCO BAL-O SSSV NP,D=3.812" Fe— Datum MD= 9740' L13tum TVD= 8800'SS CONDUCTOR, H ? /2 GAS LIFT MANDRILS 13-3/8'CSG,72#,MN-80,ID=12.347 H 2700' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 4027 3947 30 MMG OMY RK 0 10/14/12 2 7733 7157 29 MMC DMY RK 0 10/14112 3 8865 8179 21 WIG DMV RK 0 12/12197 Minimum ID =3.725" @ 8917' 4-1/2" HES XN NIPPLE g 8893' H9-5/8"X 4-1/2"BKR S-5 PKR,0=3.856 ' ' 8917' -j4-1/2"HES XN NP,D=3.725" 4-1/2"TBG,12.6#,L-80 BT A/B MOD, --I 8939' I• 8938' H4-1/2"WLEG,ID=3.958" .0152 bpf,D=3.958' -I ELMD TT NOT LOGGED TOP OF 4-1/2'LNR -I 8965' I — 8965' -I 9-5/8"X "BKR LTP&HNC HGR,ID=6.25" I 8985' -17"X 5-1/2"XO,D=3.958" 8987' -5-1/2"X 4-1/2"XO,D=3.938" TOP OF WHPSTOCK -I 9135' MLLOUT WNDOW(05-04A) 9135'- 9-5/8"CSG,47#,N-80,D=8.681" H -9135 I/ ` 10700' IDCBP(01/16116) _ i f PH 2FORATION SUMMARYvim„/, -� REF LOG:CHL ON 11/30/97 ►-•-•-- / ANGLE AT TOP FERE 71° 9979' ►•�•�•�•�•�t•�•�••• Note:Refer to Production DB for historical pert data "•_ "•_ "•"• SQE SPF INTERVAL Opn/Sgz SHOT SO2 , 2-1/2" 3 9979-9994 O 11/24/16 `12035'CTMD -4-1/2"CIBP MILLED 2-7/8" 6 10070-10090 0 07/16/07 &PUSH®OH 2-7/8" 6 10100- 10130 0 07/15/07 % (03/19/14) 2-3/4' 4 10450-10500 0 12/08/97 ` 2-3/4" 4 10570-10670 C 12/08/97 2-3/4" 4 10725-10800 C 12/08/97 2-3/4" 4 10820- 10995 C 12/08/97 2-3/4" 4 11020-11155 C 12/08/97 2-3/4" 4 11255-11355 C 12/08/97 2-3/4" 4 11460-11670 C 12/08/97 2-3/4" 4 11710- 11750 C 12108/97 Al. 2-3/4" 4 11870- 11950 C 12/08/97 PBTD -I 12253' " L', "i' 1 2-3/4" 4 12000- 12190 C 12/08/97 •y. 4-1/2"LHR,12.6#,14•80 STAB MOD, H 12338' .0152 bpf,D=3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UHT 11/16/75 INTIAL COMPLETION 05/22/14 STF/J14) DREAM CATCHER IN XN NP(04/26/14) WELL: 05-04A 12/10/97 SIDETRACK(05-04A) 09/28/15 DU/JMD TREE GO(09122/15) PH2MT No: 1960890 01/23/01 SFS-MD FINAL 01/12/16 TBD/JMD PULLED DREAMCATCHER(01/06/16) API No: 50-029-20152-01 02/04/02 RWTP CORRECTIONS 01/26/16 RRW/JM)SET CSP(01/16/16) SEC 32,T11 N,R15E,2262'FSL 8 1184'FWL 10/19/12 BSE/PJC GLV C/O(10/14/12) 11/29/16 DLS/JMD ADPERFS(11/24/16) 03/20/14 T0/PJC MLU PUSH CBP DH(03/19/14) BP Exploration(Alaska) STATE OF ALASKA " ALASKA OIL AND GAS CONSERVATION COMMIE/1)N • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program �❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5e1--- ei$P Ly 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 196-089 3. Address: P.O.Box 196612 Anchorage, Development Et Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20152-01-00 7. Property Designation(Lease Number): ADL 0028326 8. Well Name and Number: PBU 05-04A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECEIVED 11.Present Well Condition Summary: Total Depth: measured 12337 feet Plugs measured 10700 feet FEB 10 2016 true vertical 9060 feet Junk measured 12035 feet Effective Depth: measured 10700 feet Packer measured 8895 feet AOGGC true vertical 9004 feet Packer true vertical 8206.56 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 82 20"94#H-40 26-108 26-108 1530 520 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet iciktiNcv j' A .k. a Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 22-8941 22-8250 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 536 39325 56 820 895 Subsequent to operation: 100 6000 0 60 350 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations El Exploratory ❑ Development m Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Il Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data El GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature dg L4.0t0415Phone +1 907 564 4424 FEB 1 11016 Date 2/10/16 RB M - Form 10-404 Revised 5/2015 Vrt„ zRBLM -Ii R / 1 C S w Submit Original Only '1w '‘ • • d Q p 0 0 0 0 0 0 0 0 0 N - N- ot00000 cooQN- C � LUln O r N c co r Ln Ln r- N- U It) 0 0 0 0 0 0 D 0 0 0 L c') N CO LO LS) N- LO CO CO 0 O CO - - CO - N m r LO 0 CO CO CO CO I� CO CO Co O) Ln O LO CO N Lf) O O 0 CO N CO CO O) CO LO CO CO N- CO CO r N O N N N N Ln CO Co CO O CO F- C)) O LO CO V LU CO O t M N CO N- O) N N N CO N le CO O N N N N N LO CO CO CO C Q) O) LO O O CA I� 0) O MO •- 6) O O CA M CO M 't Cfl O r- N O) C)) N N N CO I- O) CO (NICO U I C i i r i I I I i i i Q Q O) O CO O) 0) 0 (fl CO V CO O O CO CO N _ N N N N N I- 2 CCD N _ 0 • W O t1) a Op Ln O p L1) O O \ O CO , CO co CO C) V Z Z O Z 0 Z J = N coo* k O Z � � •5co h ti N N () O 00 VV N r r U o M t +-' M I- LO CO 0)N O CO C cl Mn Na Co Lf) N- N CAM N O) N CO O) J N N CO') p CO CO f Z Z Z Z a)0 0000 N 0 0 0 0 0 0 0 Uau_ u_ 0000cIZ O D D IY (Y 01-1-11-UE Z Z U Cn W d O 0 O J J F- • N f6 03Ln N- d- M (Y) O N s- M M (O O O - = O M M O M LO O p_ N N M M (O OM M N Ln M In a, M 0 0 0 0 0 0 N N N M O M00000 - 00000) O O O O O O O W d 000 ) O) ❑ F O r Ln �? O O M O M N O oO 000 0 0 66 ,06 d 0 0 ,- N N N W CC) M 0 0 0 0 0 0 0 0 0 0 > ❑ CO0 MMMM MMMMM 0 2 w ❑ ❑• ❑ w rnz w w ° ❑ H -10 o_ W d Y U ° O m0 O W Y Y O O O O O Ln M M 0 0 0 0 J U V W z W r O M O N- O O LU U) N- LU LU O ¢ ¢ Nz W }i O. O ,- Ln (O 00 M = M (O N- M '- ¢ ¢ ¢ W0_ 0_ J 0 C O 000000 N _0 U_ _0 J W W D 0 r Z Z Z O J J ❑ 2 O O Li, Z ~ ❑ O W W w 0_ H F ¢ J < 2 2 2 O cn cn cn CO <n • 44.Q • O a I- C C r o o O o Ln o O Ln O o o O O N O v- Ln ti M O N V N- M O . M W ❑ 0 0 0 O O O N L a a) O 2 rrcnY = HHO JO 2 O cn w cn cn cn 0- 0 U O• L.L. W CC (XW W Ci) Cl) (I) W W W iii a a W W Q_ W W d D O W Q ii < < . Q MMCOMMmm a O t a, a d I- m N- r- M O (O (O (O (O (O (O 0 0 o O M M O O O o O O o o w Z O N N r ,- N N (NIN N N N N Z w ¢ W (O L!) \O \0 g W ❑ LJ ❑ w N N . Z _ J 0 W W w W O m ❑ _1 w J J J 2 0_ ¢ 0_ Cl) LT_ 7_ I¢i �O CL a) E 2 « « « « « « O o O O o O O o O O O O i LL 0_ U) O w N 2' Lf) tt) Lt7 Lfl In Ln Ln Ln LU Ln Ln us m 0_ 0_ NL U J O U' W 0_ 000000000000 ¢ ¢ m m w u Cl) Cl) 0_ • • Packers and SSV's Attachment PBU 05-04A SW Name Type MD TVD Depscription 05-04A TBG PACKER 8894.5 8206.56 4-1/2" Baker S-5 Packer 05-04A PACKER 8966.98 8274.22 7" Baker ZXP Packer 0 S � _ 00 E mu_ -- � $ 0 & / 'E = 2 m o I D co m o c N $ E 2 ® e c • 07 $ 2 » E & 2 m a 2 R k (13� � \ k / a>\ / oe \ � = I2 o _o % c CO o_1 rZ OZ R E \ o co \ gip* ¥ % = g / 5 O p o c O Z ) ® E 2 E 2 � - - % < ,-- 7 0 ® c E 2 < 4 E U e .E o / / kj \a / / I / C • >- c O / / \ // / 2 ® LLI ® $ -I0_� -6 �\ E � < z ƒ ƒ 0 S? aH°- § E cR O Q / 0 \ k E / - • / \ \ \ I- / / * 2 LT 0 \ I / / $ LI w 9 , 2 - p c o cac o E 4 � no fl 0 / � ccZ « � i � \ / o D f 2 Ll ƒ O Z \ 3 C / / r m 0 ƒ E 4 O Cl) q = $ O. A© 3 / � 0 0k ? 2 / f3 CD * 0 \ ® / \ / \ / \ / & � k / O R I- II 5 G II = I `- m / e = >, <- 2 2CY > = 2 > = - f2 � ® $ & \ / < O ƒ O J fY \ - 1 0 L I R E ® D 5 = i� / k E/ / / f \ / / f / \ ƒ S \ co / 4- 9 \ f \ $ o 5 $ _ • 0 \ " 7- 0 - 5 N - N— m \ m a CO t / / § w $ E % O 2 c 4 ¥ ® . . _ w e - - _ c .o c * o m .R \ 0 7 _o \ / $ ,. W / ) / � w * ti 0 CO \ � \ \ 6 0 @ = c, / / ./O O O O / O -C) CO E / \ ) C / / / ± \ 2 0 0 / / / , \ 3 \ $ R » 2 U < TRS= 4118"CEW FLS • SAOTES: WELL ANGLE>70 VVB.-LHEA 9= FMC 0 5—0 4 A ° 9963'••• ACTUATOR= BAKER C (�� OKB.ELEV= 69' I LI BF.ELEV= KOP 2910' Max Angle= 96@10361' I 2201' 4-1/2"CAMCO BAL-O SSSV NE,D=3.812" Datum MD= 9740' Datum TVD= 8800'SS "CONDUCTOR, GAS LET MANDRELS 13-3/8"CSG,72#,MN-80,ID=12.347 --L 2700' ST MD TVD DEV TYPE VLV LATCH FORT DATE L 1 4027 3947 30 KING OMY RK 0 10/14/12 2 7733 7157 29 MMG DMY RK 0 10/14112 Minimum ID =3.725" @ 8917' 3 8865 8179 21 MING DMY RK 0 12/12197 4-1/2" HES XN NIPPLE I 8893' H9-5/8"X4-1/2"BKR S-5PKRD=3.856"? II X 8917' —$4 1/2"FDS XN t+JF',D=3.725" 4-1/2"TBG, 12.6#,L-80 BTA/B MOD, --I 8939' •--I 8838' H4-1/2"WLEG,D=3.958" I 0152 bpf,D=3.958" —I ELMO TT NOT LOGGED TOP OF 4-1/2"LNR H 8965' I--—_i C 8966' — I-NFi I9-5/8"X "BKR LTP& C O2,D=6.25" —I 8985' —17"X 5-1/2"XO,D=3.958" `, 8987' --I5-1/2"X 4-1/2"XO,D=3.938" TOP OF WHPSTOCK --I 9136' — MLLOUT WIDOW(05-04A) 9135'- 9-5/8"CSG,47#,N-80,D=8.681' --I —9135 ,` 10700.J—iWFDCBP(01/16/16) PEFFORATON SUMwAARY REF LOG:CNL ON 11/30/97 y"•••.••••••, / ANGLE AT TOP PD2F'.72"@ 10070' •••••••••• • Note_Refer to Roduction 013 for historical pert data -•-•-•-•-•-•-•-•-• ` SIZE SPF EITERVAL Opn/Sgz SHOT SOZ ` 2-7/8" 6 10070-10090 0 07/16/07 `12035'CTMD 4 112"CBP MLLED 2-7/8" 6 10100-10130 0 07/15/07 &PUSHE)DH 2-3/4" 4 10450-10500 0 12/08/97 % (03/19/14) 2-3/4" 4 10570- 10670 C 12/08/97 , 2-3/4" 4 10725-10800 C 12/08/97 2-3/4" 4 10820-10995 C 12/08/97 ` 2-3/4" 4 11020-11155 C 12/08/97 ` 2-3/4" 4 11255-11355 C 12/08/97 2-3/4' 4 11460-11670 C 12/08/97 2-3/4" 4 11710-11750 C 12/08/97 2-3/4" 4 11870- 11950 C 12/08/97 2-3/4" 4 12000- 12190 C 12/08/97 PBTD H 12253' j w 411,4 4-1/2"LNR,12.6#,N-80 BTA/B MDD, H 12338' .0152 bpf,D"3.958" [ATE REV BY COMMENTS DATE REV BY COMMENT'S PRUDFOE BAY UNIT 11/16/75 INITIAL COMPLETION 05/22/14 STF/JMD DREAM CATCHER IN XN NE(04/26/14) WELL 05-04A 12!10/97 SIDETRACK(05-04A) 09/28/15 DI.VJM) TREE CIO(09/22/15) PERMT No:'1960890 01/23/01 SG-M) FINAL 01/12/16 TBDVJMD FULLED DREAMCATCHER(01/06/16) AR No: 50-029-20152-01 02/04/02 RWTP COF2RECTIDNS 01/26/16 RRW/JMD SET CBP(01/16/16) SEC 32,T11N,R15E,2262'FSL&1184'FWL 10/19/12 BEE/PJC GLV C/O(10/14/12) 03/20/14 TO/PJC MLU RJSH CEP OH(03/19/14) I BP Exploration(Alaska) STATE OF ALASKA L\p R j .4. AL.,,KA OIL AND GAS CONSERVATION COMMISSION 4 REPORT OF SUNDRY WELL OPERATIONS ,�, . 1.Operations Abandon U Repair Well U Plug Perforations U Perforate Li OtherU Mill Plug Performed: Alter Casing ❑ Pull Tubing Stimulate Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Wells 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc t 196-089-0 Development❑ Exploratory ❑ 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 • 50-029-20152-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: t. ADL0028326 " PBU 05-04A 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): v PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 12337 feet Plugs measured 11795 feet true vertical 9059.61 feet Junk measured 12035 feet Effective Depth measured 12253 feet Packer measured See Attachment feet true vertical 9045.1 feet true vertical See Attachment feet 1 Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 82 20"94#H-40 25-107 25-107 1530 520 Surface 2669 13-3/8"72#MN-80 24-2693 24-2693 5380 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner 3373 4-1/2"12.6#L-80 8965-12338 8272.37-9059.78 8430 7500 Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet SCUM JUN 1 1 2014 Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 20-8939 20-8248.1 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: p Intervals treated(measured): f18�1Y15 MAY 1 5 2014 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 486 30164 3 0 1066 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development Q Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil Q Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC] 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt N/A Contact Nita Summerhays Email Nita.Summerhays[a7bp.com Printed Name Nita Summerh- ; Title Data Coordinator j Signatu -40,14, ..• �,ZO1 3 Phone 564-4035 Date 4/16/2014 vL-i- 5/2 /I i{- CAV/7Form 10-404 Revised 10/2012 Submit Original Only i Daily Report of Well Operations ADL0028326 ACTIVITYDATE ( r SUNINIARY w = . .. s . of cope: i : Arrive on location and begin rigging up. 3/11/2014 *** Job in progress *** CTU#6 w/ 1.75" CT (CTV= 34.3 bbls). Job Scope: Mill CIBP Continue rigging up. Called grease crew for leaking SSV. Complete Rig up of CTU and make up Milling BHA with 2 7/8" motor and 3.68" 5 bladed junk mill. Fluid pack well with 1% KCI and safelube for weight transfer and displaced meth from coil. RIH and tagged high @ 11665' ctm. PU and bring pumps. Mill down to 11730' and trip back up above perfs to 10000'. RBIH and tagged/stalled out at 11729'. Pick back up and slowly mill past broke through at 11730.1 and continue RIH. Taged plug at 11790' ctm. PUH to 10000' again to clean out any possible fill to the perfs. RBIH. No issues getting through tight spot on way in the hole. Started milling plug @ 11788.4' ctm. 3/12/2014 *** Job in progress *** CTU#6 w/ 1.75" CT(CTV= 34.3 bbls). Job Scope: Mill CIBP Continued milling plug from 11788.4' ctm. Pick up to recalculate free spin. Sit back down, stall out and unable to pick up. Work jars and surge pump without getting free. Pump meth for total of 15 bbls down coil and 20 bbls FP in the tubing. Have backside injectivity of 5 bpm at 750 psi, total of 105 bbls 60/40 meth down backside while attempting to dump choke and cycle coil. Able to pump 1.2-1.4 bpm down coil at 33-3500 psi circ, positive WHP response and -0.5 bpm returns. Pumped 3/4"aluminium ball and shifted circ sub at 3900 psi. Pump Slick 1% KCL with Safelube down Coil at 4.0 bpm and attempt to wash off coil. Take 55 bbls return leaving 50 bbl backside FP. FP surface coil and standby for Mineral Oil. Spotted 20 bbls mineral oil across the perfs around the coil. Tried to work coil again without seeing any movement. Wait 1 hr and try again. 3/13/2014 *** Job in progress *** CTU#6 w/ 1.75" CT(CTV= 34.3 bbls). Job Scope: Mill CIBP Worked pipe multiple times in increments after letting mineral oil work for another 3 hrs. Rigged up N2 truck and another OTT. N2 truck had a diesel leak in the pump to the burner box which was repaired. Displaced coil with N2 for increased bouyancy, pumping at 1500 scf/min for surge when leaving circ-sub. Work Coil. Unable to lift well pumping N2 down coil due to injectivity. Pumped N2 down backside to depress fluid to -4000', let balance, and then slowly draw down well to -175 psi underbalance and work coil. No jar action or movement. Order Acid and standby. Pump 20 bbls acid down and spot across perfs. Work pipe after acid was spotted and in hour increments for 2 hrs. No good. Started overdisplacing acid w/ 100 bbls 1%KCI down the coil. 3/14/2014 *** Job in progress *** Daily Report of Well Operations ADL0028326 CTU#6 w/ 1.75" CT(CTV= 34.3 bbls). Job Scope: Mill CIBP Repaired hard line leak. Finished overdisplacing acid w/ 100 bbls 1%KCI down the coil. Dropped 7/8" disconnect ball w/60/40 meth. Saw ball seat @ 32.3 bbls and pressured up. Pressure started falling off indicating the disconnect opened. Worked pipe, held tension, pressured up without any give. Got rate of 0.4 bpm @ 3000 psi down the coil. Bypass MM and increase pressure. Disconnect shifted at 5000 psi, able to pick up at 24k and POOH. FP well 44 bbls 60/40 methanol. RDMO CTU to CTS yard and begin Maintenance. *** Job Incomplete *** **** Fish left in hole at 11769 CTMD ***** 2.875" HD disconnect with 3" GS fishing profile x 1.42' len, 2.875" Circ Sub w/3/4" aluminum ball on seat x 0.69' len, 2.875" CTD motor x 10.58' len, 3.68" 5 bladed concave junk mill x 0.54' len. (OAL 13.23') 3/15/2014 CTU #6 - 1.75" Coil (CTV= 33.2) Job Objective: Fish BHA and Mill CIBP Arrive on location. Rig up CTU and start BOP test. Had to SD for C-pump repair. 3/17/2014 ...Job in Progress... CTU #6 - 1.75" Coil (CTV= 33.2) Job Objective: Fish BHA and Mill CIBP Finished C-pump repair. Complete BOP test. Make up tools. RIH with venturi, did not see liner top. Dry tagged @ 11791, PU and pump at 2.4bpm. Lower and clean top of fish. POH with venturi and empty same. Not much in it. One small piece of metal and half cup of fill. Sample in unit. MU fishing BHA. PT PCE and begin RIH. Tagged @ 11794. PU Jar Fired hard @ 42K and PU wt returned to 25.6K coil moving up. Set back down and appeared to have fish. Begin POH. Recovered entire fish. Make up venturi toolstring and RBIH. Recovered Fish: 2.875" HD disconnect with 3" GS fishing profile x 1.42' len, 2.875" Circ Sub w/3/4"aluminum ball on seat x 0.69' len, 2.875" CTD motor x 10.58' len, 3.68" 5 bladed concave junk mill x 0.54' len. (OAL 13.23') 3/18/2014 ...Job in Progress... CTU #6 - 1.75" Coil (CTV= 33.2) Job Objective: Fish BHA and Mill CIBP Continue RIH w/WFD venturi toolstring. Displace meth from coil at min rate. Tagged plug @ 11807' ctm (down). PBUH and hoovered from 11765' - 11802'. Sat above plug for a few min pumping 2 bpm, increased pump rate to 2.8 bpm and made a few more passes. Confirmed plug tag again @ 11807'. POOH. Retrieved 1.5 cups fill and 0.5 cup pieces of cast iron, largest piece 1.75"x 0.75". MU WFD milling assembly w/P3 Agitator RIH and tagged @11809'. Mill and make passes. Plug moving down @ 22fpm to 12040. Motor stalled, temporarily detained. Jar fired coil moved uphole. RBIH tagged and stalled at 12041', detained. Worked coil jars not firing. Set down -1.5K and parked for a while. PU on coil and started coming uphole. CIBP pushed to 12035' CTMD. At 11536' began RBIH. At 11818' lost weight, stopped and began POH. POH completely. Town decision to Rig Down and Move off. 3/19/2014 ****Job Complete**** FLUIDS PUMPED BBLS _ 18 METH Daily Report of Well Operations ADL0028326 999 SLICK 1% KCL W/SAFELUBE 1089 SLICK 1% KCL 592 60/40 METH 1640 LN2 21 12% HCL 4359 TOTAL • cu O 0 03 m Lf) N- V' M M O) N r O) O) CO > (0 (O r r- 00 CO M O CO Lf) O 0 a N N M M CO MO a0 N Lf) M LC) 2 y M O O O O O O O N N N M w 0 p O) O O O O O o 0 0 0 0 0 p OO O O M O) O) O) O) O) O) O) p p w Z W g � o0 0 00 o U v w w F r C CO N- Lf) a0 lf) N M r r- J J J d d Cn Z cr t Ln O O) Lc) v o N O Q < Q w d O0. 00 o 0 0 0 0 O 0 r N N N Z Z Z O J J ? p o 0) a7 0 0 0 O O o 0 0 0 a Q Q Q = p 6' a w 0- O CO d7 O) O) O) a7 O) O) d1 a7 O) 0222 Z 00 ‹ w < < 01_ Z Q Z 2 22 J O (/) 0) (/) Cr) CO d N ca m ++ L co 0 0 0 0 Lf) Lf) Lf) 0 0 0 0 C +• O) M O N- O O) Lf) Lf) Lf) Lf) O) s 0 0 0 Co 0 0 r M (N-D- O N EN fC °' rI 0) Y 000) CC asN 2 2 2 O cn v~) (n (n co 4-4 co a NH 2 = 0 0 0 0 LU O O LfO O O O# Jpmo- OLnN- NNNDCOrN- O O dOr LfN- COONVN- aOOQp000OOOrrrrrN }1 Q N r r r r r r r = = = = = CO ca • 2 - a) d a 0c 2LL_ aWaaaW Waaaa tia a w w w w w w w w a a w < < MMMaaaaamm 0- 0 O 0 w t J d :w 0 a cn w J 00 N- N- N- N- N- ti ti N- N- N v p D p O O M O) O) O) O) M M O) r Z d d W W w O O O) O) O) O) O) O) O) O) O O ▪ N N NN O w w w NN w p (DLO CO CO CO CO CC) CO C) COM) 0) Z a 0 0 w w LL w N N N N N N N N Q J r r � r r 1"--- 1*-- M Cr) < Q m m O L- 0) d d cc •d Em < < < < < < < < < < < < z d 4 v Nrv v . O O o 0 0 0 0 0 0 0 0 0 i i i i i i i i i i i i LL a. u) O LL N CtL- C Ln LO LO LO Lf) Lf) Lf) Ln Lf) LO Lf) LO MCI a a 0 -J 0 C7 W a 0 0 0 0 0 0 0 0 0 0 0 0 Q Q CO CO w 1 CO CO a CC a, Q,o000OOOO N N 00 C7 CO 00 I�CO 11') O M N- O L(� 0 LC) OD V Lf) N I- U N 0 0 0 0 0 0 0 0 L Cr) 01 LO) N N- LCA OD C) 3 LC) vr v- CIO 00 r) V m co 00 O co co L() LU co co O co In C`) O O CA 06 T- OD N- N Cp 00 Cfl O (NI OO O V N N 0) LC) (C) CO ao C11 I 1 1 1 1 1 1 H CO COCO . . I. CO LO CV N Ln Ch CO t O N N N N N CO CO ++ CO OD (O co co V CO Lf) C`") CD O 00 LC) O CD Ch CD 00 I— N OD CA c- N QD N- 0) N OD C.) CcD 0 i i i I i ▪ N E M Ln 00 V ap CO Ln OO N Lf) O CD V O O) cy N CA N I- N v- N N = O CO N O C` .Q 0 CI- Q O L!) 1.0O Lf) 0 0 O CO a) 00 CA OD 00 �) , J (nOZ (bZJ 2 •N N V N 4 N N O r . U p N oo 00 co N 00 Nr 6) L C)N N- CO V N co co C 00 LY) , co (0 CD J Ch N M N O Z Z Z Z O O O O O 0)I— HiI= w U U U U U U N D D D » Q O 11COC0000tL2: z w 0 0 0 0 CCm OZCCCC Crf2CDD 0 0 0 Q. CO I— Packers and SSV's Attachment ADL0028326 SW Name Type MD TVD Depscription 05-04A PACKER 8893 8144.11 4-1/2" BAKER S-5 PACKER 05-04A PACKER 8965 8211.32 7" BAKER ZXP TOP PACKER TRS= 4-1/16'FMC .IAELL-EAD FMC 05-04A l SAFETY NOTES: WELL ANGLE>70°@ 9963'*** ACTUATOR= BAKER C OKB.6LEV= 69' I ( BF.ELEV= KOP= 2910 - 2201' —4-1/2"CA MCO BAL-0 SSSV NP,D=3.812" I Max Angie= )6 @ 10361' 0 Datum MD= 9740' Datum ND= 8800'SS -CONDUCTOR, I ? /I) GAS LFT MANDRELS 13-3/8'CSG,72#,koN-80,D=12.347 H 2700' ST MD TVD DEV TYPE VLV LATCH PDRT DATE I k 1 4027 3947 30 3 DMY I ( 0 10/14/12 LI 2 7733 7157 29 NUS DM' RK 0 10/14/12 Minimum ID = 3.725" @ 8917' 3 8865 8179 21 MCDMY RK 0 12/12/97 4-1/2" HES X N NIPPLE 1 Z X 8893' —9-5/8'X 4-1/2"BKR S-5 PKR,D=3.856'? ' ' 8917' —I4-1/2"HES XN NP,D=3.725" 4-1/2"TBG,12.6#,L-80 BT A/B MOD, H 8939' ` - 8938' —14-1/2"WLEG,ID=3.958" .0152 bpf,D=3.958" HELM TT NOT LOGGED TOP OF 4-1/2'LNR —( 8865' -}-- 8965' —{9-5/8"X "BKR LW&HMC HGR,D=6.25' ":=1 8985' H7"X 5-1/2"XO,D=3.958' 8987' --15-1/2"X 4-1/2'XO,0=3.938' TOP OF WHPSTOCK H 9135' k1Q_LOUT WINDOW(05-04A) 9135'- 9-5/8"CSG,47#,N-80,D=8.681" —1 —9135 k, • FERFORATION SUMMARY 44 REF LOG:CNL ON 11/30/97 ********4 ` / ♦••••••••4 •••♦••••♦•••••• ✓ ANGLE AT TOP FERE:72'@ 10070' �•�•�•�•�•�•�•�•• � Note:Refer to Production DB for historical pert data ` SCE SPF NTERVAL Opn/Sqz SHOT SOZ 2-7/8" 6 10070-10090 0 07/16/07 `;12035'CTMD —4-t/2"CUP MILLED 2-7/8' 6 10100-10130 0 07/15/07 &PISFE)DH 2-3/4" 4 10450-10500 0 12/08/97 ,` (03/19/14) 2-3/4" 4 10570-10670 0 12/08/97 2-3/4' 4 10725-10800 0 12/08/97 ` 2-3/4" 4 10820-10995 0 12/08/97 2-3/4" 4 11020-11155 0 12/08/97 2-3/4" 4 11255-11355 0 12/08/97 2-3/4' 4 11460-11670 0 12/08/97 2-3/4' 4 11710-11750 0 12/08/97 2-3/4" 4 11870-11950 0 12/08/97 2-3/4" 4 12000-12190 0 12/08/97PBTD 12253' ' leaf 4-1/2'LNR,12.6#,N-80 BT A/B MOD, -4 12338' Al 0152 bpf,ID=3.958' DATE REV BY COtvMNTS — DATE REV BY COMvENTS PRUDHOE BAY INT 11/16/75 INITIAL COMPLETION 06/13/04 MoUKAK SET VVTFIREDaBP WELL: 05-04A 12/10/97 RWO 05/30/06 DIM WELLI-EAD CORRECTION PERMT No:r1960890 01/23/01 SS-MD ANAL 07/16/07 RLMPJC PERFORATIONS API No: 50-029-20152-01 02/04/02 RN/TP CORRECTIONS 10/19/12 BSE/PJC GLV C/0(10/14/12) SEC 32,111N,R15E 2262'FSL&1184'FWL 06/07/03 BY/TLH ADD P&A OF ORIGINAL WELL 03/20/14 TO/PJC MLU PLASH CUP DH(03/19/14) 08/17/03 CMO/TLP PERE ANGLE CORRECTION BP Exploration(Alaska) • rB 06-04 A PriS ick,Decio Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIlntegrityCoordinator ©bp.com] Sent: Tuesday, August 21, 2012 7:13 AM To: Schwartz, Guy L (DOA); Regg, James B (DOA); AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; AK, OPS GC1 OSM; AK, OPS Well Pad DFT N2; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; Youngmun, Alex; Russell, James; Duong, Lea Cc: AK, D &C DHD Well Integrity Engineer Subject: NOT OPERABLE: Producers with Sustained Casing Pressure During Proration All, The following producers were found to have sustained casing pressure on the IA during proration. The immediate action is to perform a TIFL on each of the wells to evaluate for IA repressurization. If the wells fail the TIFL, a follow up email will be sent to the AOGCC for each individual well with a plan forward. 01 -20 (PTD #1821460) v5 -04A (PTD #1960890) F -24 (PTD #1831540) SCANNED MAY 0 7 2.013 F -30 (PTD #1891100) All the wells listed above are reclassified as Not O•erable until start -u• o•erations commence and are stable or the well passes a pressure test confirming integrity. After start -up, the wells will be reclassified as Under Evaluation with POP parameters to prevent any over - pressure incidents if integrity has not been confirmed. Please call with any questions or concerns. Thank you, Mehreen Vazir BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWeIIlntegrityCoordinator @BP.com 1 . . STATE OF ALASKA 1~;1 ALASKA OIL AND GAS CONSERVATION COMM SION ~ REPORT OF SUNDRY WELL OPERATIONS ;¡>.f~a. Stimulate 0 Other 0 ¡£ Waiver 0 Time Extension 0 ~ 9'J' ¿; ?a Re-enter Suspended Well 0 0;..) 0-:;> 29 5. Permit to Drill Number: . <it" . tà 196-0890 - ~0 . 6. API Number: 50-029-20152-01-00 ~ Plug Perforations 0 Perforate New Pool 0 Perforate [2] 4. Current Well Class: Development t7 Stratigraphic Exploratory Service 1. Operations Abandon 0 Repair Well 0 Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Ope rat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 9. Well Name and Number: 61.05 KB PBU 05-04A ADLO-028326 11. Present Well Condition Summary: 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool ~ 8. Property Designation: T ota! Depth measured true vertical 12337 . 9059.61 feet feet Plugs (measured) Junk (measured) 11795 None Effective Depth measured 11795 feet true vertical 9026 feet Casing length Size MD TVD Burst Collapse Surface 2669 13-3/8" 72# MN-8o 24 - 2693 24 - 2693 5380 2670 Production 2736 9-5/8" 47# R-S-95 22 - 2758 22 - 2758 8150 5080 Production 3446 9-5/8" 40# SOO-95 2758 6204 2758 - 5823.33 6820 3330 Production 992 9-5/8" 47# MN-80 6204 - 7196 5823.33 - 6686.1 6870 4760 Production 1939 9-5/8" 47# R-S-95 7196 - 9135 6686.1 - 8430.41 8150 5080 Perforation depth: Measured depth: 10450 - 12190 True Vertical depth: 9003.06 - 9035 - - SCANNED JUl 3 1 2007 - - Tubing: (size, grade, and measured depth) 4-1/2" 12.6# l-80 20 - 8939 Packers and SSSV (type and measured depth) 4-1/2" Baker S-5 Packer 7" Baker ZXP Top Packer o o 8893 8965 o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): RBDMS 8Fl JUL 3 Q 2007 Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of logs and Surveys Run Daily Report of Well Operations Oil-Bb' 551 601 Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 18044 5 0 20322 6 0 15. Well Class after oroposed work: Exploratory Development P 16. Well Status after proposed work: Oilt7 Gas WAG Tubing pressure 980 849 13. Service x Contact Gary Preble WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Data Management Engineer Signature Phone 564-4944 Date 7/18/2007 OR\G\NAL Å" [7(., ,#' ~~ubmit Original Only . . " 05-04A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 7/15/2007 cTU #8, Add Perf; MIRU. RIH with PDS memory GR/ccL in carrier w/3.0" nozzle. Log from 1 0270' ctmd up to 9550' ctmd. Flag pipe at 10030' ctmd. POOH. Correction (-17'). MU and RIH with Gun #1: 30' - SLB 2.875" PJ Omega 2906-HMX @ 6 spf. Correct depth at flag. Perforate interval 1 01 00' to 10130' (ref: SLB Memory PPROF 06/14/03). POOH. All shots fired. Continued on WSR 07/16/07. 7/16/2007 cTU #8 w/ 1.75" OD CT. Adperfs. Continued from WSR 07/15/07. MU and RIH with Gun #2: 20' - SLB 2.875" PJ Omega 2906-HMX @ 6 spf. Correct depth at flag. Perforate interval 1 0070' - 10090' (ref: SLB memory PPROF 06/14/03). POOH. FP well to 2500' with 50/50 methanol/water. At surface, all shots fired. Release well to well optimization engineer. Job Complete. FLUIDS PUMPED BBLS 100 1 % KCL 47 50/50 METHANOLlWATER 147 TOTAL . . WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: AOGCC C~ristine Mahnken 3ó3 W. 7th Ave Suite 100 Anchorage. Alaska 99501 (907) 793-1225 RE: Cased Hale/Open Hale/Mechanical Lags and/or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services. Inc. Attn: Robert A. Richey 130 West Intemational Airport Road Suite C Anchorage. AK 99518 Fax: (907) 245-8952 1) 2) 3) 4) 5) 6) 7) EDE Disk o.S. 05 - 04A Coil Flag 17-Ju1-07 SCANNED JUL 2 3 2007 ACt, - ()1f1 -:it 15:)57 Signed: ~ RECEIVED Date : JUL 2 0 2007 Print Name: ~ /1 rì~t-'I\A ~_ ~(Alilil.pÁA "\1aska Oil &. Gas Cons. COmmission Anchorage PROACTIVE DIAGNOSTIC SERVICES, INc., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AI( 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE : WWW.MEMORYLOG.COM D:\Master _Copy- 00 ]DSANC·2Oxx\Z _ WordlDisttibu1ìonITtansmittal_ SheetslTmnsmit _ Origina1.doc ,~ STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIO~~ 2 72004 ~. 1. Operations Performed: c1laska Oil &.G~rons. Commission AbandonD RepairWeliD PluQ Perforations IX] Stimulate O~W Alter CasingD Pull TubingO Perforate New PoolD rage WaiverD Time ExtensionO Change Approved ProgramD Operation ShutdownO Perforate D Re-enter Suspended Well 0 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ŒI ExploratoryD 196-0890 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 Stratigraphic D ServiceD 50-029-20152-01-00 7. KB Elevation (ft): 9. Well Name and Number: 61.05 05-04A 8. Property Designation: 10. Field/Pool(s): ADL-o028326 Prudhoe Bay Field / Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 12337 feet true vertical 9059.6 feet Plugs (measured) 11795 Effective Depth measured 11795 feet Junk (measured) None true vertical 9026.4 feet Casing Length Size MD TVD Burst Collapse Conductor 82 20" 94# H-40 25 - 107 25.0 - 107.0 1530 520 Liner 3373 4-1/2" 12.6# Lo80 8965 - 12338 8272.4 0 9059.8 8430 7500 Production 2736 9-5/8" 47# R-S-95 22 - 2758 22.0 - 2758.0 8150 5080 Production 3446 9-5/8" 40# SOO-95 2758 - 6204 2758.0 - 5823.3 6820 3330 Production 992 9-5/8" 47# MN-80 6204 0 7196 5823.3 - 6686.1 6870 4760 Production 1939 9-5/8" 47# R-S-95 7196 - 9135 6686.1 - 8430.4 8150 5080 Surface 2669 13-3/8" 72# MN-80 24 - 2693 24.0 0 2693.0 5380 2670 Perforation depth: Measured depth: 10450 - 10500, 10570 - 10670, 10725 - 10800, 10820 - 10995, 11020 - 11155, 11255 - 11355, 11460 - 11670 11710 - 11750 True vertical depth: 9003.06 - 9003.17,9002.97 - 9003.14,9004.55 - 9004.83,9004.44 - 9006.63,9006.8 - 9003.9,9005.45 - 9008.32 9011.02 - 9022.01, 9024.3 - 9025.69 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 20 - 8939 Packers & SSSV (type & measured depth): 4-1/2" Baker S-5 Packer @ 8893 7" Baker ZXP Liner Top Packer @ 8965 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Mcf Waler-Bbl Casing Pressure Tubing Pressure Prior to well operation: 674 27.6 0 150 1055 Subsequent to operation: 771 31 0 2000 803 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentOO Service D Copies of Logs and Surveys run - 16. Well Status after proposed work: Daily Report of Well Operations. ~ OilŒ] GasD WAGD GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact Garry Catron N/A Printed Name Garry Catron Title Production Technical Assistant Signature 11 C( /lAJf/" C _. -J-;-: ÎA "'\1"1"1" I Phone 564-4657 Date 8/24/04 r"'\ " UK 10 II\J 1-\ L G 3u Form 10-404 Revised 4/2004 RBOMS BfL NJ ~ ~ 05-04A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 06/05/04 ***TRAVELED FROM DSO 05-24*** (DRIFT CT CIBP, ADPERF). ARRIVED ON LOC.INSPECT AREA,WELL SHUT-IN SSV DUMPED. RAN 3.60 CENT. WI 1.5 S.B. STOPPED DUE TO DEV @ 10,150 SLM.. RIG DOWN CALLED DSO WELL SHU 06/13/04 CTU #5, CIBP; CONT' FROM WSR 6/12/04... RU CTU #5. LOAD WELL WITH 100 BBLS OF KCL TO KNOCK DOWN WHP. RIH WITH 3.625' DRIFT AND PDS MEMORY GR/CCL INSIDE 2.4" CARRIER TO 12050' CTMD. LOG FROM 12050' TO 11550' CTMD. FLAG PIPE AT 11800' CTMD. POOH. SET CIBP @ 11,795' MD. POOH. RDMO. ***CIBP SET DEPTH CORRECTED TO SPERRY SUN MWD LOG 27-NOV TO 06-DEC 97 (TIE-IN LOG REFERENCED IN PROGRAM, SWS CNL, IS NOT DEEP ENOUGH FOR CIBP SET DEPTH).*** WELL LEFT SHUT IN AND FREEZE PROTECTED. DSO WILL ATTEMPT TO POP UPON CTU DEPARTURE. «JOB COMPLETE»> 06/13/04 Set CIBP @ 11795' FLUIDS PUMPED BBLS 173 1 % KCL 36 50/50 Methonal 209 TOTAL Page 1 ~ ~. TREE = FMC Ge.J 1 05-04A SAFETY NOTES: HORIZONTAL WELL. 70° @ 9963' AND900@ 10255' W8..LI-EAD = CrN ACTUATOR = BAKER KB. ELEV = 61' BF. ELEV = KOP= 2910' Max AnQle = 96 tá11 0361' DatumMD= 9740' DatumTVD = 8800' SS . 2201' 13-3/8" CSG, 72#, MN-80,ID= 12.347 ST MD 1 4027 2 7733 3 8865 Minimum ID = 3,725" @ 8917' 4-1/2" HES XN LANDING NIPPLE 8893' 8917' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 8939' 8939' TOPOF 7-1/2" LNR 8965' 8965' 7-1/2" LNR, __7#, N-80,__? bpf, ID = _? TOPOF 5-1/2" LNR 8985' 5-1/2" LNR, 17#, N-80, .0232 bpf, D = 4.892" TOPOF 4-1/2" LNR 8987' TOP OF WHIPSTOCK PERFORATION SUMMARY REF LOG: CNL ON 11/30197 ANGLEATTOPÆRF: 91 @ 10450' IIble: Refer 10 A'oduction DB for his1Drical perf data SIZE SPF INTER\! AL OpnlSqz Dð. TE 2-314" 4 10450 -10500 0 12/08197 2-314" 4 10570 - 10670 0 12/08197 2-314" 4 10725 -10800 0 12/08197 2-314" 4 10820 -10995 0 12/08197 2-314" 4 11020-11155 0 12/08197 2-314" 4 11255 - 11355 0 12/08197 2-314" 4 11460 -11670 0 12/08197 2-314" 4 11710 - 11750 0 12/08197 2-314" 4 11870 - 11950 C 12/08197 2-314" 4 12000 -12190 C 12/08197 4-1/2" LNR, 12.6#, N-80, .0152 bpf, D =3.958" Dð. TE REV BY COMMe.JTS DATE REVBY COMMENTS 06/76 ORIGINAL COM PLEfION 06113104 Iv'cL/KAK SEf WTl-RFD CBP 12112197 LAST WORKOVER 01f23¡Q1 SS-MO FINAL 02,u4.1J2 RN/TP CORRa::TONS 06,u7,u3 BYITLH ADD P&A OFORI3INAL WELL 08/17,u3 CMOITLP PERF ANGLECORRa::TION 4-1/2" CAMCO BAL-O SSSV NIP, ID = 3.812" GAS LIFT MA,f\DR8..S TVD rEV 1YÆ VLV LATCH 3947 30 CA-MMG RK 7157 29 CA-MMG RK 8179 21 CA-MMG RK PORT Dð. TE 9-5/f!' X 4-1/2" BAKER S-5 PKR 4-112" I-ES XN LAf\DING NP, ID = 3.725" 4-112" TLeING TAIL WLEG 9-5/8" X 7-1/2" BAKER L T PKR 7-112" X5-1/2"XO 5-112" X 4-1/2" XO H ELMO TT NOTLOGGED I 4-1/2" WTl-RFD aPB (06l13,u4) 12298' 12338' PRLOI-OE BAY UNIT WELL: O5-04A PERMrr lib: 1960890 AA lib: 50-029-20152-01 Sa:: 32, T11 N, R15E, 300.03' FEL & 358.3' FNL BP Exploration (Alaska) 11/18/03 Schlumberger NO. 3045 Alaska Data & Consulting Services Company: State of Alaska 3940 Arctic Blvd, Suite 300 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-5711 Attn: Lisa Weepie ATIN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color (' Well Job # Log Description Date Blueline Prints CD F-23A \ "-19 . 0 ~ L.. 10558573 MCNL 09/07/03 1 1 J.-). --5~r-, G-04A 'C¡ p;..... ¡ I ,.,."":2.'" 10563450 MCNL 06/05/03 1 1 1t-. ;~~~ \ 7-14B £) r~ ~ i 1-.\ ~ 10669982 MCNL 10/15/03 1 1 i~ ~~d. A-06 í~;::) -CJ", 9 10568460 RST-SIGMA 06/27/03 1 1 :ç.:,.~ -::;c 07-04A 'I q ~ ""'0 (() <:..- 10687646 RST-SIGMA 09/19/03 1 1 i/;;l l~nclL\ 05-04A "\ q 1(' '(i'"\5<; ~ 10558553 MCNL 06/14/03 1 1 'i~_~;Q 9 ..", ( - - PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Schlumberger GeoQuest Petrotectnical Data Center LR2-1 3940 Arctic Blvd, Suite 300 900 E. Benson Blvd. ~.j"'-~ :-"r\ C. I \j/E D Anchorage, AK 99503-5711 Anchorage, Alaska 99508 l-"\.t"" ,~- ;1-- . . '. A TIN: Beth J .,~~IØ'ftIIV~... Date Delivered:DF(' ?? ~no~ Received ~~\ :'/\:-:~-\~c.C (~~f'.""" AJ.~eka C~! & Gas (;ons. u>mmiwon Anc~ortJge ~~«-~. . S(Çt~lMl~t:I: ~H~\NI 2 @ 2004 '~~~rv\ ~ 07/22/03 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth NO. 2916 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott Well Job # Log Description Date Blueline Color Prints CD Z-39 ¢--~~' PROD LOG W/DEFT 07/19/03 D.~S. 2-14 -~c~)--(~) ~-~ RST G~VEL PACK 07/17/03 Z-~- ~ ~ ~ ~ ~ ~ LDL 07/16103 N-~B '~ - ~ SBHP SURVEY 07/16103 D.S. 15-08B ~ ~ ~ ~ RST G~VEL PACK 07/14103 K.317B ~[ ~ ( D PROD PROFILE W/DEFT 06109/03 D.S. 5-04A ~ ~G~~ ELM PROD PROFILE 06114/03 D-13A ~~1 MEM PROD PROFILE 06123/03 D.S. 5-02A ~[ ~ L~ ~' ELM PROD PROFILE 06/10103 - PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND REIURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Schlumberger GeoQuest 3940 Arctic BIvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth AOGCC Geological Materials Inventory TD ) ~k~ ~537 PERMIT 96-089 ARCO Log 7891 8225 MWD SRVY NGP-MD NGP -TVD PEX-AIT PEX-CN/3DDT PEX-CN/GR Data SCHLUM PEX-AIT SPERRY MPT/GR ~PERRY 9143.-12337. 9166-12338 8427-9059 L-~' 9135-10280 ~'~ 9135-10280 j~ 9150-10280 PEX-SSTVD j 9135-10280 ~407 Completion Date 1°l//[!/~[ 7 -- Are dry ditch samples required? Daily well ops ///! 7ff~) yes ~.~o Sent Received Box 1/5/1998 1/7/1998 1/21/1998 1/21/1998 1/13/1998 1/14/1998 1/21/1998 1/21/1998 1/21/1998 1/21/1998 1/5/1998 1/7/1998 T 1/5/1998 1/7/1998 1/5/1998 1/7/1998 1/5/1998 1/7/1998 And received? __ __ Analysis description received? Was the well cored? yes ~. no Aretests required? yes ~. no Well is in compliance ~ Initial Comments Received? \Vednesday, October 13, 1999 Page 1 o£ I (~ALASKAO h, hear e.d rv IC~,~ rilling BP Exploration / Arco To: Alaska Oil & Gas Conservation Commission Date: February 27, 1998 From: Subject: Terrie Hubble Technical Assistant Permit #96-89, 05-04A Enclosed, in duplicate, are revised copies of the above listed Well Completion Report and Log. A corrected directional survey has been received from the vendor and all TVD's have been recalculated as well as the well location at the top of the productive interval and total depth. The well histories and logs have previously been filed with the Commission and there are no changes. Thank you. /tlh STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised: 02/27/98 1. Status of Well Classification of Service Well [] Oil ~] Gas [] Suspended [] Abandoned I~ Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 96-89 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 __ 50-029-20152-01 4. Location of well at surface . ~'t~I~l~t 9. Unit or Lease Name 2262' NSL, 4096' WEb, SEC. 32, T11 N, R15E, UM , 't~lil~l~ ~ Prudhoe Bay Unit At top of productive interval '/--~.,~/~/~,~----~ 10. Well Number .. , · ,,:.[~ . 1715' NSL, 1324' WEb, SEC 31, T11N, R15E, UM '_~C-- 05-04A At total depth ..-. . 11. Field and Pool 361' SNL, 294' WEb, SEC. 06, T10N, R15E, UM Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 61.05'I ADb 028329 12. Date Spudded11/26/97 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' water depth' if OffshOre 116' NO' Of c°mpletiOnsl 2/5/97 12/11/97 N/A MSLI One 17. Total Depth (MD+TVD)Jl 8. Plug Back Depth (MD+TVD),19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 12337 9059 FTI 12253 9045 FTI []Yes [] No (Nipple) 2201' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, 4-Phase RES, RES/ALT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 76' 36" 590 sx Permafrost II 13-3/8" 72# MN-80 Surface 2700' 17-1/2" 5400 sx Permafrost II 9-5/8" 40# / 47# N-80/RS-95 Surface 9135' 12-1/4" 1500 sx Class 'G', 125 sx Permafrost II 4-1/2" 12.6# N-80 8979' 12338' 6" 430 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 2-3/4" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 8939' 8893' MD TVD MD TVD 10450' - 10500' 9003' - 9003' 11870' - 11950' 9025' - 9023' 10570' - 10670' 9002' - 9003' 12000' - 12190' 9024' ~ 9035' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10725' - 10800' 9004' - 9004' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10820' - 10995' 9004' - 9006' 11020' - 11155' 9006' - 9003' Freeze Pr0..tect. with 1.52 Bbls of Diesel 11255' - 11355' 9005' - 9008' .~' . · 11460' - 11670' 9010' - 9021' ~ ' ' ' 11710' - 11750' 9024' - 9025' 0RI ~...:, 27. PRODUCTION TEST . Date First Production j Method of Operation (Flowing, gas lift, etc.) December 28, 1997~ Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure iCALCULATED OIL-BBb GAS-MCF WATER-BBb O~L GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9106' 8396' Shublik 9146' 8440' Sadlerochit 9228' 8517' Zone 1B 9874' 8919' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 'Be and the best of my knowledge 32. I hereby certify ~h~t the foregoing is~ correct to Signed k...~ DanSto~tz /f ,~-¢z ...... Title Engineering Supervisor Date ,- // 05-0Z~'A 96-89 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL.' This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. .. ~,. ...... r. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility PB DS 05 Progress Report Well 05-04A Rig Page l Date 13 January 98 Date/Time 17 Nov 97 18 Nov 97 19 Nov 97 20 Nov 97 06:00-09:00 09:00-10:00 10:00-10:30 10:30-11:00 11:00-17:00 17:00-18:00 18:00-18:30 18:30-20:00 20:00-21:30 21:30-23:00 23:00-01:30 01:30-03:30 03:30-06:00 06:00-06:30 06:30-09:00 09:00-15:00 15:00-18:00 18:00-18:30 18:30-21:00 21:00-22:00 22:00-22:30 22:30-23:30 23:30-00:00 00:00-03:30 03:30-04:00 04:00-05:00 05:00-05:15 05:15-06:00 06:00-06:30 06:30-07:30 07:30-09:00 09:00-11:30 11:30-12:30 12:30-13:00 13:00-14:00 14:00-14:30 14:30-15:00 15:00-15:15 15:15-18:00 18:00-18:30 18:30-19:00 19:00-00:00 00:00-00:45 00:45-02:45 02:45-03:30 03:30-04:00 04:00-04:30 04:30-05:00 05:00-06:00 06:00-06:30 06:30-08:00 08:00-14:30 14:30-15:30 15:30-17:00 Duration 3hr lhr 1/2 hr 1/2 hr 6hr lhr 1/2 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr 2-1/2 hr 2hr 2-1/2 hr 1/2 hr 2-1/2 hr 6hr 3hr 1/2 hr 2-1/2 hr lhr 1/2hr lhr 1/2 hr 3-1/2 hr 1/2 hr lhr 1/4 hr 3/4 hr 1/2 hr lhr 1-1/2 hr 2-1/2 hr lhr 1/2 hr lhr 1/2 hr 1/2 hr 1/4 hr 2-3/4 hr 1/2 hr 1/2hr 5hr 3/4 hr 2hr 3/4 hr 1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr 1-1/2 hr 6-1/2 hr lhr 1-1/2 hr Activity Held safety meeting Rig moved 0.00 % Held safety meeting Rigged down Drillfloor / Derrick Rig moved 90.00 % Rigged up Drillfloor / Derrick Held safety meeting Rigged up Drillfloor / Derrick Rig moved 100.00 % Fill pits with Seawater Fill pits with Seawater Reverse circulated at 3147.00 fi Circulated at 3147.00 ft Held safety meeting Removed Wellhead integral components Rigged up BOP stack Tested BOP test plug assembly Held safety meeting Tested BOP test plug assembly Made up BHA no. 1 Fished at 25.00 ft Made up BHA no. 2 Fished at 30.00 ft Circulated at 8821.00 ft Pulled BHA Laid down 120.00 ft of Tubing Rigged up Emergency hang off assembly Serviced Drillfloor / Derrick Held safety meeting Serviced Retrievable packer Removed Seal assembly Installed Seal assembly Tested Bottom ram Retrieved Retrievable packer Tested Casing - Via annulus and string Retrieved Retrievable packer Rigged up Tubing handling equipment Held safety meeting Laid down 2200.00 fi of Tubing Held safety meeting Retrieved SCSSSV Laid down 4300.00 fi of Tubing Retrieved Straddle / pack off tool Laid down 1920.00 fi of Tubing Retrieved Straddle / pack off tool Laid down 300.00 ft of Tubing Removed Tubing han.dling equipment Installed Wear bushing Singled in drill pipe to 0.00 ft Held safety meeting Made up BHA no. 3 Singled in drill pipe to 4734.00 ft Serviced Block line Rigged up Kelly/top drive hose Facility PB DS 05 Progress Report Well 05-04A Rig Page Date 2 13 January 98 Date/Time 21 Nov 97 22 Nov 97 23 Nov 97 24 Nov 97 17:00-18:00 18:00-18:30 18:30-00:00 00:00-00:15 00:15-00:30 00:30-02:30 02:30-03:00 03:00-04:30 04:30-06:00 06:00-06:30 06:30-09:30 09:30-11:00 11:00-12:00 12:00-13:00 13:00-16:30 16:30-17:15 17:15-18:00 18:00-18:30 18:30-23:45 23:45-01:00 01:00-01:30 01:30-04:00 04:00-06:00 06:00-06:30 06:30-10:30 10:30-12:00 12:00-13:30 13:30-16:00 16:00-17:30 17:30-18:00 18:00-18:30 18:30-19:30 19:30-21:30 21:30-22:30 22:30-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-07:30 07:30-10:30 10:30-10:45 10:45-14:00 14:00-15:00 15:00-18:00 18:00-18:30 18:30-20:00 20:00-03:30 03:30-05:00 05:00-06:00 06:00-06:30 06:30-08:00 08:00-09:30 09:30-10:30 10:30-11:00 Duration lhr 1/2 hr 5-1/2 hr 1/4 hr 1/4 hr 2hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 3hr 1-1/2 hr lhr lhr 3-1/2 hr 3/4 hr 3/4 hr 1/2 hr 5-1/4 hr 1-1/4 hr 1/2 hr 2-1/2 hr 2hr 1/2 hr 4hr 1-1/2 hr 1-1/2 hr 2-1/2 hr 1-1/2 hr 1/2 hr 1/2hr lhr 2hr lhr 5-1/2 hr lhr lhr 1/2 hr lhr 3hr 1/4 hr 3-1/4 hr lhr 3hr 1/2 hr 1-1/2 hr 7-1/2 hr 1-1/2 hr lhr 1/2hr 1-1/2 hr 1-1/2 hr lhr 1/2 hr Activity Singled in drill pipe to 4851.00 ft Held safety meeting Singled in drill pipe to 8810.00 ft Circulated at 8810.00 ft Held drill (Kick while drilling) 'Circulated at 8810.00 ft Fished at 8817.00 ft Circulated at 8810.00 ft Pulled.out of hole to 1000.00 ft Held safety meeting Pumped out of hole to 400.00 ft Pulled BHA Held safety meeting Made up BHA no. 4 R.I.H. to 8817.00 ft Fished at 8817.00 ft Circulated at 8817.00 ft Held safety meeting Pulled out of hole to 400.00 ft Pulled BHA Tested Rotary table Made up BHA no. 5 R.I.H. to 1000.00 ft Held safety meeting R.I.H. to 8817.00 ft Milled Production packer at 8817.00 ft Circulated at 8860.00 ft Milled Production packer at 8860.00 ft Circulated at 8845.00 ft Milled Production packer at 8845.00 ft Held safety meeting Milled Production packer at 9454.00 ft Circulated at 9272.00 ft Laid down 650.00 ft of 5in OD drill pipe Pulled out of hole to 450.00 ft Pulled BHA Rigged up Logging/braided cable equipment Held safety meeting Conducted electric cable operations Conducted electric cable operations Held safety meeting Installed Bridge plug Tested Casing Made up BHA no. 6 Held safety meeting Made up BHA no. 6 R.I.H. to 9149.00 ft Circulated at 9149.00 ft Pulled out of hole to 8600.00 ft Pulled out of hole to 8737.00 ft Circulated at 8737.00 ft R.I.H. to 9139.00 ft Set tool face Set tool face Facility PB DS 05 Progress Report Well 05-04A Rig Page Date 3 13 January 98 Date/Time 25 Nov 97 26 Nov 97 27 Nov 97 28 Nov 97 29 Nov 97 30 Nov 97 11:00-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-07:30 07:30-09:00 09:00-11:00 11:00-11:15 11:15-15:00 15:00-16:00 16:00-18:00 18:00-18:30 18:30-20:00 20:00-22:00 22:00-02:30 02:30-04:00 04:00-04:15 04:15-06:00 06:00-06:30 06:30-07:30 07:30-09:00 09:00-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-10:30 10:30-11:30 11:30-17:30 17:30-19:30 19:30-21:30 21:30-03:00 03:00-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-07:00 07:00-08:30 08:30-10:30 10:30-18:00 18:00-18:30 18:30-20:30 20:30-21:00 21:00-23:30 23:30-06:00 06:00-06:30 06:30-09:30 09:30-10:30 10:30-15:00 15:00-18:00 18:00-18:30 18:30-19:00 19:00-01:00 Duration 7hr 1/2 hr 11-1/2 hr 1/2 hr lhr 1-1/2 hr 2hr 1/4 hr 3-3/4 hr lhr 2hr 1/2 hr 1-1/2 hr 2hr 4-1/2 hr 1-1/2 hr 1/4 hr 1-3/4 hr 1/2 hr lhr 1-1/2 hr 9hr 1/2 hr 11-1/2 hr 1/2 hr 4hr lhr 6hr 2hr 2hr 5-1/2 hr 3hr 1/2 hr 11-1/2 hr 1/2 hr 11-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 2hr 7-1/2 hr 1/2 hr 2hr 1/2 hr 2-1/2 hr 6-1/2 hr 1/2 hr 3hr lhr 4-1/2 hr 3hr 1/2 hr 1/2 hr 6hr Activity Milled Casing at 9152.00 ft Held safety meeting Milled Casing at 9164.00 ft Held safety meeting Drilled to 9196.00 ft Circulated at 9164.00 ft Pulled out of hole to 7000.00 ft Held drill (Spill) Pulled out of hole to 900.00 ft Pulled BHA Tested BOP stack Held safety meeting Tested BOP stack Laid down 450.00 ft of 5in OD drill pipe Made up BHA no. 7 R.I.H. to 3184.00 ft Held drill (Kick while tripping) R.I.H. to 6888.00 ft Held safety meeting Serviced Block line R.I.H. to 9166.00 ft Drilled to 9356.00 ft Held safety meeting Drilled to 9642.00 ft Held safety meeting Drilled to 9711.00 ft Circulated at 9711.00 ft Pulled out of hole to 9711.00 ft Pulled BHA Made up BHA no. 8 R.I.H. to 9711.00 ft Drilled to 9796.00 ft Held safety meeting Drilled to 10170.00 ft Held safety meeting Drilled to 10306.00 ft Held safety meeting Circulated at 10306.00 ft Pulled out of hole to 9100.00 ft Circulated at 10306.00 ft Pulled out of hole to 1384.00 ft Held safety meeting Pulled BHA Held safety meeting Made up BHA no. 9 R.I.H. to 6200.00 ft Held safety meeting R.I.H. to 8934.00 ft R.I.H. to 8968.00 ft R.I.H. to 10306.00 ft Pulled out of hole to 8946.00 ft Held safety meeting Flow check Pulled out of hole to 0.00 ft Facility PB DS 05 Progress Report Well 05-04A Rig Page Date 4 13 January 98 Date/Time 01 Dec 97 02 Dec 97 03 Dec 97 04 Dec 97 05 Dec 97 06 Dec 97 01:00-06:00 06:00-06:30 06:30-08:00 08:00-09:00 09:00-09:30 09:30-13:30 13:30-18:00 18:00-18:30 18:30-05:30 05:30-06:00 06:00-06:30 06:30-15:00 15:00-15:15 15:15-17:00 17:00-18:00 18:00-18:30 18:30-23:00 23:00-01:30 01:30-03:00 03:00-03:15 03:15-06:00 06:00-06:30 06:30-13:45 13:45-15:00 15:00-16:30 16:30-18:00 18:00-18:30 18:30-23:00 23:00-23:30 23:30-00:00 00:00-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-10:00 10:00-10:15 10:15-11:00 11:00-18:00 18:00-18:30 18:30-00:30 00:30-06:00 06:00-06:30 06:30-16:00 16:00-17:00 17:00-17:15 17:15-18:00 18:00-18:30 18:30-20:30 20:30-21:30 21:30-23:00 23:00-23:30 23:30-01:15 01:15-02:00 02:00-03:30 Duration 5hr 1/2 hr 1-1/2 hr lhr 1/2hr 4hr 4-1/2 hr 1/2 hr llhr 1/2 hr 1/2 hr 8-1/2 hr 1/4 hr 1-3/4 hr lhr 1/2hr 4-1/2 hr 2-1/2 hr 1-1/2 hr 1/4 hr 2-3/4 hr 1/2 hr 7-1/4 hr 1-1/4 hr 1-1/2 hr 1-1/2 hr 1/2hr 4-1/2 hr 1/2 hr 1/2 hr 3hr lhr 2hr 1/2 hr 3-1/2 hr 1/4 hr 3/4 hr 7hr 1/2 hr 6hr 5-1/2 hr 1/2hr 9-1/2 hr lhr 1/4 hr 3/4 hr 1/2hr 2hr lhr 1-1/2 hr 1/2 hr 1-3/4 hr 3/4 hr 1-1/2 hr Activity Made up BHA no. 9 Held safety meeting R.I.H. to 9136.00 fl Serviced Lines / Cables R.I.H. to 10091.00 fl Reanled to 10306.00 ft Drilled to 10324.00 ft Held safety meeting Drilled to 10550.00 ft Serviced Mud pumps Held safety meeting Drilled to 10834.00 ft Held drill (Spill) Drilled to 10900.00 fl Drilled to 10930.00 ft Held safety meeting Drilled to 11090.00 ft Pulled out of hole to 9996.00 ft Drilled to 11153.00 ft .Held drill (Spill) Drilled to 11216.00 ft Held safety meeting Drilled to 11468.00 ft Drilled to 11500.00 ft Circulated at 11500.00 ft Pulled out of hole to 8900.00 ft Held safety meeting Pulled out of hole to 3302.00 ft Pulled BHA Tested BOP stack Tested BOP stack Made up BHA no. 10 R.I.H. to 3314.00 fl Held safety meeting R.I.H. to 9089.00 fl Held drill (Kick while tripping) R.I.H. to 11500.00 ft Drilled to 11755.00 ft Held safety meeting Held drill (Fire) Drilled to 12018.00 ft Held safety meeting Drilled to 12337.00 ft Circulated at 12337.00 ft Held drill (Kick while drilling) Circulated at 12337.00 ft Held safety meeting Pumped out of hole to 9036.00 fl R.I.H. to 12337.00 ft Circulated at 12337.00 fl Circulated at 12337.00 fl Pulled out of hole to 10865.00 ft R.I.H. to 12337.00 ft Circulated at 12337.00 ft Progress Report Facility PB DS 05 Well 05-04A Page 5 Rig Date 13 January 98 Date/Time 07 Dec 97 08 Dec 97 09 Dec 97 10 Dec 97 03:30-06:00 06:00-06:30 06:30-09:30 09:30-09:40 09:40-14:00 14:00-14:15 14:15-18:00 18:00-18:30 18:30-20:30 20:30-21:00 21:00-02:00 02:00-02:30 02:30-03:00 03:00-06:00 06:00-06:30 06:30-10:00 10:00-13:00 13:00-16:00 16:00-18:00 18:00-18:15 18:15-18:50 18:50-19:30 19:30-20:20 20:20-21:00 21:00-22:30 22:30-04:00 04:00-05:30 05:30-06:00 06:00-06:30 06:30-07:00 07:00-10:00 10:00-13:30 13:30-14:30 14:30-15:00 15:00-18:00 18:00-18:30 18:30-19:00 19:00-19:45 19:45-22:30 22:30-23:30 23:30-00:30 00:30-02:30 02:30-05:30 05:30-06:00 06:00-06:30 06:30-09:30 09:30-11:00 11:00-11:30 11:30-13:30 13:30-18:00 18:00-18:30 18:30-00:30 00:30-02:00 02:00-02:15 Duration 2-1/2 hr 1/2 hr 3hr 0hr 4-1/4 hr 1/4 hr 3-3/4 hr 1/2 hr 2hr 1/2 hr 5hr 1/2 hr 1/2 hr 3hr 1/2 hr 3-1/2 hr 3hr 3hr 2hr 1/4 hr 1/2 hr 1/2 hr 3/4 hr 1/2 hr 1-1/2 hr 5-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 3hr 3-1/2 hr lhr 1/2 hr 3hr 1/2 hr 1/2 hr 3/4 hr 2-3/4 hr lhr 2hr 3hr 1/2hr · 1/2hr 3hr 1-1/2 hr 1/2 hr 2hr 4-1/2 hr 1/2 hr 6hr 1-1/2 hr 1/4 hr Activity Pulled out of hole to 8900.00 ft Held safety meeting Pulled out of hole to 3314.00 ft Held drill (H2S) Pulled BHA Held safety meeting Ran Liner to 2550.00 ft (4-1/2in OD) Held safety meeting Ran Liner to 3374.00 ft (4-1/2in OD) Installed Tubing handling equipment Ran Tubing to 3288.00 ft (2-7/8in OD) Installed Other sub-surface equipment , Circulated at 3314.00 ft Ran Liner on landing string to 7500.00 ft Held safety meeting Ran Liner to 9136.00 ft (4-1/2in OD) Circulated at 9136.00 ft Ran Drillpipe to 12337.00 ft (5in OD) Circulated at 12337.00 ft Circulated at 12337.00 ft Held safety meeting Batch mixed slurry - 91.000 bbl Displaced slurry - 171.600 bbl Functioned Setting tools Circulated at 12240.00 ft Cleared Trip tank Pulled Drillpipe in stands to 8965.00 ft Circulated at 8965.00 ft Held safety meeting Circulated at 8965.00 ft Pulled Drillpipe in stands to 3258.00 ft Laid down 3258.00 ft of Tubing Tested Casing Held safety meeting Ran Tubing to 2644.00 ft (2-7/8in OD) Held safety meeting Ran Tubing to 3364.00 ft (2-7/8in OD) Rigged up sub-surface equipment - TCP Ran Drillpipe in stands to 6000.00 ft Serviced Block line Ran Drillpipe to 7200.00 ft (5in OD) Functioned TCP Pulled Drillpipe in stands to 0.00 ft Rigged up sub-surface equipment - Other sub-surface equipment Held safety meeting Ran Drillpipe in stands to 7200.00 ft Ran Drillpipe in stands to 12246.00 ft Held safety meeting Perforated from 10450.00 ft to 12190.00 ft Laid down 4500.00 ft of Drillpipe Held safety meeting Laid down 4300.00 ft of Drillpipe Laid down 1620.00 ft of Tubing Held safety meeting Facility PB DS 05 Progress Report Well 05-04A Rig Page Date 6 13 January 98 Date/Time 11 Dec 97 02:15-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-15:00 15:00-16:00 16:00-18:00 18:00-18:30 18:30-19:00 19:00-22:00 22:00-03:00 03:00-03:30 03:30-05:30 05:30-06:00 06:00-06:30 06:30-09:30 09:30-14:00 14:00-16:00 16:00-18:00 18:00-18:30 18:30-21:00 Duration 3-3/4 hr 1/2 hr 1/2 hr lhr 7hr lhr 2hr 1/2 hr 1/2 hr 3hr 5hr 1/2 hr 2hr 1/2 hr 1/2 hr 3hr 4-1/2 hr 2hr 2hr 1/2 hr 2-1/2 hr Activity Retrieved Perforating tools Held safety meeting Retrieved Gun assembly Retrieved Wear bushing Ran Tubing to 6733.00 ft (4-1/2in OD) Installed SCSSSV Ran Tubing to 7500.00 ft (4-1/2in OD) Held safety meeting Ran Tubing to 8939.00 fl (4-1/2in OD) Installed Tubing hanger Reverse circulated at 8939.00 ft Set packer at 8893.00 fl with 3500.0 psi Tested Permanent packer Installed BOP test plug assembly Held safety meeting Rigged down BOP stack Rigged up Surface tree Tested Surface tree Freeze protect well - 152.000 bbl of Diesel Held safety meeting Rig moved 100.00 % SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA SHARED SERVICES DRILLING PBU / 5-04A 500292015201 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/23/98 PAGE DATE OF SURVEY: 120597 MWD SURVEY JOB NUMBER: AKMW80022 KELLY BUSHING ELEV. = 61.05 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9143.00 8437.24 8376.19 9153.00 8446.43 8385.38 9173.00 8464.87 8403.82 9203.89 8493.86 8432.81 9234.08 8522.60 8461.55 22 58 23 30 22 0 18 32 17 22 S 87.16 W .00 923.24S 2682.75W S 88.00 W 6.25 923.41S 2686.69W N 88.80 W 9.72 923.47S 2694.42W N 74.90 W 19.12 922.07S 2704.96W N 57.70 W 17.92 918.40S 2713.41W -747.68 -749.76 -754.07 -761.16 -768.94 9266.16 8552.95 8491.90 9297.63 8581.94 8520.89 9329.29 8610.12 8549.07 9359.94 8636.56 8575.51 9393.12 8664.25 8603.20 20 46 25 10 29 4 31 51 35 0 N 36.91 W 23.53 911.28S 2720.88W N 22.76 W 22.33 900.64S 2726.83W N 13.62 W 17.99 886.94S 2731.25W N 2.91 W 19.89 871.61S 2733.42W N 3.61 E 14.39 853.36S 2733.26W -779.03 -791.18 -804.99 -818.88 -833.87 9424.71 8689.41 8628.36 9456.86 8713.61 8652.56 9488.17 8735.54 8674.49 9519.22 8754.99 8693.94 9547.52 8770.28 8709.23 39 25 42 57 48 8 54 15 60 16 N 9.96 E 18.50 834.42S 2730.95W N 15.34 E 15.55 813.79S 2726.29W N 19.04 E 18.59 792.46S 2719.66W N 20.77 E 20.18 769.73S 2711.41W N 23.48 E 22.71 747.70S 2702.43W -848.23 -862.65 -876.54 -890.68 -903.83 9581.12 8785.37 8724.32 9613.27 8798.41 8737.36 9644.46 8812.08 8751.04 9675.91 8827.47 8766.42 9708.52 8844.43 8783.38 66 21 65 46 62 12 59 14 58 8 N 24.61 E 18.37 720.30S 2690.20W N 26.47 E 5.59 693.78S 2677.53W N 31.03 E 17.42 669.21S 2664.07W N 36.35 E 17.51 646.39S 2648.88W N 41.86 E 14.82 624.78S 2631.32W -919.59 -934.36 -947.09 -957.39 -965.37 9740.19 8860.55 8799.50 9772.73 8875.90 8814.85 9801.60 8888.86 8827.81 9837.44 8904.42 8843.37 9868.55 8917.11 8856.06 60 41 63 2 63 38 64 57 66 55 N 47.43 E 17.14 605.41S 2612.16W -970.59 N 53.43 E 17.80 587.15S 2590.05W -973.22 N 59.58 E 19.15 572.93S 2568.54W -972.87 N 66.15 E 16.92 558.22S 2539.82W -968.85 N 72.62 E 20.02 548.23S 2513.25W -962.14 9901.11 8929.46 8868.41 9930.57 8939.96 8878.91 9962.64 8950.97 8889.92 9995.31 8961.88 8900.83 10029.79 8973.00 8911.95 68 32 69 43 70 9 70 50 71 33 N 79.35 E 19.75 540.95S 2484.03W -951.70 N 85.59 E 20.20 537.35S 2456.76W -939.32 S 87.84 E 19.29 536.76S 2426.66W -922.86 S 81.09 E 19.59 539.74S 2396.03W -903.15 S 74.58 E 17.99 546.61S 2364.14W -879.51 10059.60 8982.61 8921.56 10090.76 8992.32 8931.27 10122.37 9000.47 8939.42 10153.02 9006.29 8945.24 10187.47 9010.83 8949.78 70 52 S 67.94 E 21.21 555.67S 2337.43W 72 50 S 61.66 E 20.17 568.28S 2310.66W 77 17 S 57.38 E 19.22 583.77S 2284.36W 80 50 S 51.35 E 22.54 601.30S 2259.92W 83 59 S 45.75 E 18.51 623.90S 2234.34W -856.99 -831.50 -803.88 -775.63 -742.56 -ORIGINAL SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU / 5-04A 500292015201 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/23/98 DATE OF SURVEY: 120597 MWD SURVEY JOB NUMBER: AKMW80022 KELLY BUSHING ELEV. = 61.05 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10219.22 9013.22 8952.17 10254.70 9014.07 8953.02 10296.31 9013.32 8952.27 10328.82 9011.12 8950.07 10361.02 9007.81 8946.76 87 24 89 49 92 15 95 31 96 15 S 39.50 E 22.39 647.19S 2212.92W S 33.44 E 18.38 675.69S 2191.85W S 25.50 E 19.95 711.88S 2171.40W S 22.62 E 13.41 741.49S 2158.18W S 23.25 E 2.99 770.99S 2145.70W -711.25 -675.83 -634.41 -602.49 -571.09 10392.29 9004.78 8943.73 10425.12 9002.98 8941.93 10456.29 9002.42 8941.37 10488.44 9002.47 8941.42 10518.74 9002.71 8941.67 94 52 91 23 90 40 89 8 89 56 S 21.97 E 6.03 799.71S 2133.73W S 23.51 E 11.59 829.94S 2121.06W S 23.01 E 2.79 858.57S 2108.76W S 23.84 E 5.44 888.07S 2095.98W S 23.68 E 2.69 915.80S 2083.77W -540.61 -508.50 -477.91 -446.34 -416.55 10551.40 9002.62 8941.57 10583.72 9002.18 8941.13 10614.43 9001.83 8940.78 10646.76 9002.07 8941.02 10679.42 9002.85 8941.80 90 24 91 8 90 10 88 58 88 16 S 22.72 E 3.26 945.82S 2070.90W S 22.87 E 2.34 975.61S 2058.38W S 23.26 E 3.37 1003.86S 2046.35W S 22.65 E 4.16 1033.63S 2033.75W S 22.94 E 2.32 1063.73S 2021.10W -384.50 -352.83 -322.70 -291.01 -259.01 10710.01 9003.68 8942.63 10742.55 9004.22 8943.17 10773.44 9004.44 8943.39 10805.46 9004.16 8943.11 10838.65 9003.58 8942.53 88 36 89 28 89 43 91 15 90 44 S 22.23 E 2.56 1091.96S 2009.35W S 22.69 E 3.02 1122.03S 1996.92W S 23.44 E 2.55 1150.45S 1984.82W S 23.73 E 4.89 1179.79S 1972.01W S 23.49 E 1.73 1210.20S 1958.72W -229.06 -197.22 -166.92 -135.46 -102.84 10869.24 9003.40 8942.35 10901.01 9003.61 8942.56 10932.94 9004.19 8943.14 10964.41 9005.17 8944.12 10996.68 9006.09 8945.04 89 56 89 19 88 34 87 52 88 51 S 23.53 E 2.62 1238.25S 1946.52W S 23.03 E 2.51 1267.43S 1933.96W S 24.35 E 4.74 1296.66S 1921.14W S 24.81 E 2.69 1325.26S 1908.05W S 24.55 E 3.17 1354.57S 1894.59W -72.79 -41.61 -10.23 20.78 52.58 11028.81 9006.10 8945.05 11059.68 9005.35 8944.30 11091.88 9004.29 8943.24 11122.94 9003.55 8942.50 11153.40 9003.32 8942.27 91 4 91 43 92 3 90 40 90 10 S 24.14 E 7.03 1383.84S 1881.34W S 25.29 E 4.26 1411.87S 1868.44W S 25.25 E 1.06 1440.97S 1854.70W S 25.30 E 4.45 1469.05S 1841.45W S 24.46 E 3.21 1496.68S 1828.63W 84.22 114.65 146.44 177.11 207.16 11184.57 9003.44 8942.39 11217.56 9003.93 8942.88 11248.57 9004.67 8943.62 11279.60 9005.84 8944.79 11311.90 9007.09 8946.04 89 22 88 55 88 20 87 20 88 12 S 21.88 E 8.67 1525.34S 1816.37W S 22.66 E 2.74 1555.86S 1803.87W S 20.19 E 8.18 1584.71S 1792.55W S 18.98 E 5.04 1613.92S 1782.15W S 17.63 E 4.95 1644.56S 1772.02W 237.74 270.01 300.22 330.22 361.24 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU / 5-04A 500292015201 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/23/98 DATE OF SURVEY: 120597 MWD SURVEY JOB NUMBER: AKMW80022 KELLY BUSHING ELEV. = 61.05 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 11342.62 9007.67 8946.62 89 35 S 17.34 E 4.62 1673.86S 1762.79W 390.65 11374.05 9007.73 8946.68 90 10 S 17.80 E 2.36 1703.82S 1753.30W 420.75 11405.76 9007.87 8946.82 89 19 S 16.53 E 4.84 1734.11S 1743.94W 451.06 11436.58 9008.99 8947.94 86 31 S 16.33 E 9.11 1763.65S 1735.23W 480.37 11482.05 9011.80 8950.75 86 23 S 18.28 E 4.29 1806.97S 1721.74W 523.77 11513.48 9013.66 8952.61 86 50 S 18.16 E 1.51 1836.78S 1711.93W 553.93 11544.94 9015.21 8954.17 87 28 S 17.52 E 2.83 1866.69S 1702.30W 584.06 11577.54 9016.58 8955.53 87 43 S 15.72 E 5.57 1897.89S 1692.99W 615.10 11609.22 9017.95 8956.90 87 20 S 15.96 E 1.39 1928.34S 1684.35W 645.12 11640.61 9019.60 8958.55 86 36 S 15.90 E 2.36 1958.48S 1675.74W 674.88 11672.99 9021.63 8960.58 86 12 S 17.26 E 4.37 1989.45S 1666.52W 705.66 11704.57 9023.46 8962.41 87 8 S 17.40 E 2.98 2019.55S 1657.13W 735.82 11736.88 9024.75 8963.70 88 16 S 16.69 E 4.16 2050.41S 1647.67W 766.66 11768.29 9025.52 8964.47 88 55 S 16.33 E 2.34 2080.52S 1638.75W 796.56 11798.82 9025.84 8964.79 89 52 S 15.36 E 4.47 2109.89S 1630.41W 825.52 11830.73 9025.52 8964.47 91 15 S 14.85 E 4.61 2140.69S 1622.10W 855.66 11862.62 9024.80 8963.75 91 19 S 16.21 E 4.27 2171.40S 1613.56W 885.85 11894.18 9024.07 8963.02 91 19 S 16.16 E .17 2201.70S 1604.77W 915.84 11926.45 9023.36 8962.31 91 11 S 15.85 E 1.04 2232.72S 1595.87W 946.48 11958.12 9022.95 8961.90 90 16 S 16.11 E 3.02 2263.16S 1587.15W 976.54 11990.26 9023.24 8962.19 88 40 S 17.01 E 5.71 2293.96S 1577.99W 1007.15 12022.52 9024.30 8963.25 87 32 S 16.26 E 4.23 2324.85S 1568.77W 1037.88 12054.86 9025.69 8964.64 87 32 S 16.78 E 1.61 2355.83S 1559.58W 1068.65 12086.53 9027.04 8965.99 87 35 S 16.08 E 2.22 2386.18S 1550.63W 1098.77 12118.66 9028.46 8967.41 87 19 S 17.00 E 2.99 2416.95S 1541.49W 1129.34 12150.02 9030.27 8969.22 86 3 S 16.26 E 4.69 2446.94S 1532.53W 1159.18 12182.34 9033.47 8972.42 82 34 S 16.54 E 10.77 2477.79S 1523.45W 1189.78 12213.72 9038.04 8976.99 80 40 S 17.10 E 6.31 2507.50S 1514.47W 1219.39 12245.89 9043.34 8982.29 80 22 S 17.51 E 1.58 2537.80S 1505.03W 1249.74 12278.34 9048.86 8987.81 80 1 S 17.24 E 1.35 2568.31S 1495.48W 1280.34 12337.00 9059.03 8997.98 80 1 S 17.24 E .00 2623.49S 1478.36W 1335.58 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 3011.35 FEET AT SOUTH 29 DEG. 24 MIN. WEST AT MD = 12337 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 145.73 DEG. TIE-IN SURVEY AT 9,143.00' MD WINDOW POINT AT 9,153.00' MD PROJECTED SURVEY AT 12,337.00' MD SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU / 5-04A 500292015201 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/23/98 DATE OF SURVEY: 120597 JOB NUMBER: AKMW80022 KELLY BUSHING ELEV. = 61.05 FT. OPERATOR: ARCO ALASKA INC iNTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9143.00 8437.24 8376.19 10143.00 9004.59 8943.54 11143.00 9003.35 8942.30 12143.00 9029.79 8968.74 12337.00 9059.03 8997.98 923.24 S 2682.75 W 595.27 S 2267.74 W 1487.22 S 1832.94 W 2440.22 S 1534.49 W 2623.49 S 1478.36 W 705.76 1138.41 432.65 2139.65 1001.24 3113.21 973.56 3277.97 164.76 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 5-04A 500292015201 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/23/98 DATE OF SURVEY: 120597 JOB NUMBER: AKMW80022 KELLY BUSHING ELEV. = 61.05 FT. OPERATOR: ARCO ALASKA INC iNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9143.00 8437.24 8376.19 923.24 S 2682.75 W 705.76 9168.87 8461.05 8400.00 923.46 S 2692.84 W 707.82 2.06 9274.90 8561.05 8500.00 908.50 S 2722.61 W 713.85 6.03 9389.28 8661.05 8600.00 855.48 S 2733.30 W 728.23 14.38 9530.16 8761.05 8700.00 761.28 S 2708.04 W 769.11 40.88 9741.25 8861.05 8800.00 604.80 S 2611.44 W 880.21 111.10 9992.83 8961.05 8900.00 539.55 S 2398.36 W 1031.78 151.58 12337.00 9059.03 8997.98 2623.49 S 1478.36 W 3277.97 2246.19 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS 23-Feb-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Please replace earlier distribution with this data Re: Distribution of Survey Data for Well 5-04A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 9,143.00' MD 9,153.00' MD 12,337.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company I::] Ft I I_ I-- I IM (::S S~I~/I (~ ~ S WELL LOG TRANSMITTAL To: State of Alaska January 21. 1998 Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D.S. 05-04A, AK-MM-80022 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-20152-01. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company ,ermy-sun r~ I:t I I_1_ I hi G S~ FI~/I r- El S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs D.S. 05-04A, AK-MM-80022 January 21, 1998 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Jim Galvin. Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 D.S. 05-04A · 2" x 5" MD Gamma Ray Logs: 50-029-20152-01 2" x 5" TVD Gamma Ray Logs' 50-029-20152-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company CI F! I /1__1 I~ G SEFI~JICES 13-Jan-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 5-04A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 9,143.00' MD 9,153.00' MD 12,337.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company 1/5/98 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11691 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape D.S. 05-04A 97575 PEX-AIT ~ 7~(~[ 971130 1 D.S, 05-04A 97575 PEX-AIT 971130 1 1 D,S, 05-04A 97575 PEX-CNL/GR 9711 30 I 1 D.S. 05-04A 97575 PEX-CNL/3 DETECTOR DENSITY 971 1 30 I 1 D.S. 05-04A 97575 !PEX-SSTVD 971130 I I SIGNED: Please sign and return one copy of this transmittal to Sherrle at the above address. Thank you. MEMORANDUM TO: .,. David Joh~ Chairman' ¢-- THRU: Blair Wondzell, P. !. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: November 25, 1997 FILE NO: aeikkyee.doc FROM: Chuck Scheve, ~- ,.S SUBJECT: Petroleum Inspector BOPE Test Doyon 16 PBU DS 5-04A PTD # 96-89 Tuesday November 25, 1997: I traveled to Arco's Drill Site 5-04A Well being drilled by Doyon Rig 16 and witnessed the weekly BOPE test. As the attached AOGCC BOPE test report shows the test lasted 3 hours with no failures. The test went well with good test procedures being employed by the Doyon crews The rig was clean and all related equipment appeared to be in good working order. The location was well organized allowing good access to the rig. Summary: Doyon 16, Attachment: I witnessed the weekly BOPE on Doyon rig 16. 11/25197, test time 3 hours, no failures aeikkyee.xls X Unclassified Confidential (Unclassified if doc. removed ) Confidential STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover:~ ~ Drlg Contractor: Doyon Rig No. 16 PTD # 96-89 Operator: SSD Rep.: Well Name: 5-04A Rig Rep.: Casing Size: Set @ Location: Sec. Test: Initial Weekly X Other DATE: 11/25/97 Rig Ph.# 659-4610 Sheridan Whip Scott Hiem 32 T. 11N R. 15E Meridian Umiat Test Well Sign OK Drl. Rig OK MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location Yes Standing Order Posted Yes Hazard Sec. OK" FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. Pressure 1 250/5,000 f 250/5,000 I 250/5,000 I 250/5,000 P/F BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F 1 250/2500 P I 250/5,000 P 1 250/5,000 P I 250/5,000 P I 250/5,000 P 2 250/5,000 P I 250/5,000 P N/A N/A N/A CHOKE MANIFOLD: No. Valves 13 No. Flanges Manual Chokes '/ Hydraulic Chokes 1 26 250/5,000 Test Pressure P/F 250/5,000 lP P Functioned P~ Functioned P ACCUMULATOR SYSTEM: System Pressure 2900 ! Pressure After Closure 1700 I MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes 25 sec. Trip Tank OK OK System Pressure Attained 1 minutes 45 sec. Pit Level Indicators OK OK Blind Switch Covers: Master: OK Remote: OK Flow Indicator OK OK Nitgn. Btl's: 6 ~ 2100 PSI Meth Gas Detector OK OK o Psig. H2S Gas Detector OK OK ' - Number of Failures: 0 ,Test Time: ' 3.0 Hours. Number of valves tested 21 Repair or Replacement of Failed Equipment will be made within 0 daYs. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Good test Distribution: orig-Well File c - Oper./Rig c- Database c - Tdp Rpt File c - Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Chuck Scheve FI-021L (Rev. 12/94) aeikkyee TONY KNOWLES, GOVERNOR ALASi~& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 October 2. 1997 Tim A. Burns Senior Drilling Engineer ARCO Alaska. Inc. P O Box i96612 Anchorage. AK 99519-6612 Re: Prudhoe Bay Unit 5-04A ARCO Alaska. Inc. Permit No. 96-89 Surf Loc.: 2262'NSL. 4096'WEL, Sec. 32, T1 IN, R15E, UM Btmhole Loc.: 5153'NSL, 507'WEL, Sec. 06, T10N, R15E. UM Dear Burns: Enclosed is the approved revised application for permit to drill the above referenced well. The provisions of the original approved permit dated May 16, 1997 are in effect for this revision. Chairman BY ORDER OF THE COMMISSION dlf/encl Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl .... STATE OF ALASKA ALASKA L,,L AND GAS CONSERVATION COM,v~ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil I-IRe-Entry I--IDeepenI I--IService I-'lDevelopment Gas []Sin~lle Zone []Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan RKB = 60.1' Prudhoe Bay Field / Prudhoe 3.- Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028329 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2262' NSL, 4096' WEL, SEC. 32, T11N, R15E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number U-630610 1419' NSL, 1251' WEL, SEC 31, T11N, R15E, UM 05-04A At total depth 9. Approximate spud date Amount $200,000.00 5153' NSL, 507' WEL, SEC. 06, T10N, R15E, UM 10/20/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028326, 127'I No Close Approach 2560 11773' MD / 8980' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 9300' MD Maximum Hole Angle 90° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 IBT A/B Mod 2623' 9150' 8384' 11773' 8980' 363 sx Class 'G' ~,, · .3; ~ .... /- .... 19. To be completed for Redrill, Re-entry, and Deepen Operations ...... ,~. [-', ~,_, r.~. 0;~ {43?- Present well condition summary ~'*':-"~;~* .-;-:' ~'~ ..... L. 0iw,. ~., JP.,~ ,o~ .... Total depth: measured 9945 feet Plugs (measured) Abandonment Cement Plug tagged at 9454' (06/97) true vertical 9177 feet Effective depth: measured 9454 feet Junk (measured) true vertical 8725 feet Casing Length Size Cemented M D TVD Structural Conductor 76' 20" 490 sx Permafrost II 76' 76' Surface 2631 13-3/8" 5400 sx Permafrost II 2700' 2700' Intermediate Production 9839' 9-5/8" 1500 sx Class 'G', 125 sx PF II 9908' 9163' Liner Perforation depth: measured None f%P:~[ ~"I?, ~ /i i true vertical '._-'., ',. iL._ * i i ':'~ /-4~ ,~[ 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number:.f jChris Brown, 564-5/~2 Prepared By Name/Number: Terrie Hubble, 564-4628 21.1 hereby certify that the f~egoin~s/,,~ and correct to the best of my knowledge Signed TimA' Burns . . _ Title Senior Drillin9 Engineer Date ~ Commission Use Only Permit Number I APl Number I ApprpvatDate J See cover letter ?~' -.., <:~><~ 50-029-20152-01 [ O/a/~' "") for other requirements Conditions of Approval: Samples Required []Yes J~ No Mud Log Requited []Yes ~]No Hydrogen Sulfide Measures []Yes [] No Directional Survey Required 'J~Yes [] No Required Working Pressure for BOPE [-12M; [-13M; ~SM; [-I10M; ~15M Other: . or.r o, Approved By Commissioner the commission Date Form 10-401 Rev. 12-01-85 L Submit~ ~ : I Well Name: IDS 5-04A I Sidetrack Plan Summary IType of Redrill (producer or injector): I Shut-in Producer I Surface Location: 2262' FSL, 4096' FEL, S32, Ti IN, R15E, UM Target Location: 1419' FSL, 1251' FEL, S31, Ti 1N, R15E, UM Bottom Hole Location: 5153' FSL, 507' FEL, S6, T10N, R15E, UM I AFENumber: 14J0371 I I Estimated Start Date: 110/20/97 I I Rig: I Doyon 16 I Operating days to complete: 122 IUD: 1 11773' I TVD: 1 8,980'ss I ~KB 160.1' I wen Design (conventional, slimhole, etc.): I Conventional horizontal sidetrack IObjective: I Sidetrack the 5-04 well to the deepest producible Romeo sands, 600' east of the I existing bottom hole location. Expected incremental recovery is 1.15MMBO Mud Program Whipstock Mud Properties: Solids Free 6 % Quikdriln Density Funnel LSR LSRV API FL ph (PPG) Viscosity YP 8.6-8.9 45-65 10-18 >35,000 NC 8.5-9.0 Production Mud Properties: Solids Free 6 % Quikdriln Density Viscosity LSR LSRV AP1 FL pH (PPG) YP 8.6-8.9 45-65 10-18 >35,000 NC 8.5-9.0 Directional I KOP: I -+9,300' MD (estimated) Maximum Hole Angle: [ _+90° Close Approach Well: I None DS 5-04A Sidetrack Drilling Permit Page 2/4 Formation Markers Formation Tops MD TVD (SS) TSAD 9252' 8452' Kick off point 9300' 8523' Window kick off point TZ4A 9325' 8545' TZ3 9410' 8626' TZ2C 9470' 8685' TZ2B 9516' 8724' TZ2A 9662' 8821' TZ1 B 9808' 8905' Target 1 9984' 8950' Beginning of target polygon BSAD 10900' 8955' TD 11773' 8980' End of target polygon - 4-1/2" liner point Casing Tubing Program Hole Size Csg Wt/Ft Grade Conn Length Top Btm MD/TVDss MD/TVDss 6" 4.5" 12.6 LB0 [BT A/B 2623' 9150'/8384' 11773'/8980' MOD 4.5" 12.6 LB0 [BT A/B 9080' 20'/-40.1' 9,100'/8338' MOD Cement Lead Cement Tail Cement Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 4-1/2" None 363 / 15.7 / 1.19 Class G: 40% excess; TOC at liner top; Pump time = 4+ hrs; Volume assumptions: Gauge hole + designated excess; 80' shoe joints; TOC as listed. Log ng Program Logs: 6" Hole MWD GR/4 phase RES to TD. Platform express from kick off to horizontal. Cased Hole: None planned DS 5-04A Sidetrack Drilling Permit Page 3/4 Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and will be capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. Hazards This pad is notorious for lost circulation in the production interval although no faults are expected in the proposed target. This will require the rig to be prepared to pump LCM at all times. Careful monitoring of mud properties will be necessary to ensure mud weight does not rise too high, as several wells have experienced differentially stuck pipe in the horizontal section, due to high overbalance. The biggest risk is reservoir quality in the R7120-7140 interval which may have marginal permeabilities. Structural dip is 1° to th~:ii~soUth, i~and-~ the' eastern edge of the polygon is a hardline to avoid a fault. :"' <~-'' '~' :' ~ :: ,i ) .' Disposal All cuttings should be hauled to the ball mill at CC-2A for !tti~¢'g~l. Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. Operational Summary Pre-Rig Work: 1. CMIT tubing / 9-5/8" casing to 3,500psi and notify operations drilling engineer of result. R/U slickline and drift tubing down to production packer. . . R/U perforating guns on electric line and perforate tubing at +8700'. Attempt to establish flow through the perforated holes and circulate well to clean seawater. Freeze protect to _+2,200' MD. BPV cannot be set in the well due to POGLM stuck in tubing hanger. Measure tubing pressure 48hours before the rig moves over location, ff the tubing pressure is not zero, set and test a 2.25" plug in the X nipple at 8,942'. If the tubing pressure identified is zero, leave the well open for 6 hours and check for flow. If no flow is observed, no plug will be required. Inform Rig Supervisor and Operations Drilling Engineer of status of tubing pressure. DS 5-04A Sidetrack Drilling Permit Page 4/4 4. Remove wellhouse and flowlines, level pad, dig out cellar. Rig Work: Test 9-5/8" packoff to 5,000psi, and function lock down screws. . MIRU. If a plug is set in the well, test plug before ND tree. ND tree. Set BOP blanking plug and NU BOP's. Test same. Pull BOP blanking plug and plug (if set). Circulate well with 8.5ppg seawater. . Attempt to straight pull the tubing from the PBR at 8821'. If successful, replace 9-5/8" packoff if necessary while pulling tubing, and skip to step 5. If the tubing cannot be retrieved with straight pull, R/U and attempt to retrieve stuck POGLM from tubing hanger and remaining two POGLM's from 6519' and 8440'. . RIH with chemical cutter and make chemical cut in the middle of the first full joint above the packer at _+8784'. Pull 5-1/2" tubing and 4-1/2" tailpipe from chemical cut. Retrieve seals and K-anchor and mill/retrieve packer. Replace 9-5/8" packoff if necessary while pulling tubing. . M/U and RIH with bridge plug on electric line for whipstock kick off at 9,300. M/U 6" whipstock and kick off sidetrack at depth of 9,300'. M/U 6" drilling assembly and directionally drill as per plan to TD of section at +11,773' MD. Run DPC open hole logs over the build section of the well to horizontal. 7. M/U and run 4-1/2" liner to TD and hang off in 7" casing. Cement liner in place and cleanout if necessary. 8. RIH and perforate liner with DPC guns. M/U and run 4-1/2" L80 completion with 3 GLM's to +9,200' MD (RP shear in top GLM). Shear RP valve in uppermost GLM. @. Set BPV and test from below. N/D BOP's. N/U tree. Set tree test plug and test tree. Pull test plug and BPV. Circulate and freeze protect well. 10. Set BPV and RDMO. Shared Services Drilling Sfrucfure: PB DS 05 Field ' Prudhoe Boy Well: 05-04A Location: Alaska East -> -3400 -5200 -5000 -2800 -2600 -2400 -2200 -2000 -1800 -1600 -1400 -1200 -1000 -800 -600 -40O -- -600 - -- -800 - -- -1000- -1200- -1400- -1600- - -1800- -- -2000- -2200- - --2400- - -2600 Scale 1 ' 200.00 [ 05-04AWp2I 05-04A T1 / .... TARGET DATA .... J MO ~c Dif '~ No~h Ea:~ -- Name .... Po.li~or, --- I 9984 89.75 137.00 9010 -843 -2452 0S-04AT! 695860,5947,550 1111S 88.25 172.75 9020 -173S -1765 05-04At~ 696550,5946675 11775 88.27 172.76 9040 -2388 - 1682 05-04A'r2 696650,59 4 6025 4 1/2' Uner 05-04A Mid 05-04AT2 -400 - -600 - -800 -- --1000 -- --1200 - --1400 - --16oo O --4800 ::D"' --2000 -- --2200 --2400 '' - o -2600 o -5400 -5200 -5000 -2800 -260.~:-2400 -2200 -2000 -1800' -1600 -1400 -1200 -1000 -800 -600 Scale 1 ' 200.00 East -> PRELIMINARY c) 0 0 · o 2> II ¥ [ 05-04AWp2 I 8000 8200 8400 8600 8800 9OO0 9200 9400 9600 9800 I~i~k°onf f Point 20.22 4¢.71 End of Build 52.07 End of Hold Shared Services Drilling Sfrudure' PB DS 05 Field · Prudhoe Bay WELL Well' 05-04A Location 'Alaska PROFILE DATA .... Point .... MD Inc Dir ]VD Tie on 9300 22.54 266.04 8582 KOP 9`3326 25.00 268,00 8606 End of Build 9580 51.55 45.1,3 88`30 End of Hold 9658 51.55 45.1,3 8878 forget 9984 89.73 137.00 9010 [nd of Build 9994 89.7,3137.98 9010 End of Hold 10767 89.75 137.98 9013 target 11118 88.25 172,75 9020 target 11773 88.27 172.76 9040 No~h East DLS(deg/lOOft) -926 -2743 0.00 -927 -2754 10,00 -848 -2734 28.00 -805 -2691 0.00 -843 -2432 28.00 -850 -2425 10.00 -1424 -1908 0.00 -1735 -1765 10.00 -2388 -1682 0.00 PRELIMINARY 41/2" Uner -1400 -1200 -1000 -800 -600 -400."!~,;7200 0 200 400 600 800 1000 1200 1400 1600 Scale 1 ' 200. O0 ve,tioo~ Section on 144.0,5 azimuth wifh reference 0.00 N, 0.00 ir from 04A · . Ical Section I 144.03 59.50' MD Inc. Azl. TVDss TVDrkb Rect. Coordinates Northlng Eastln9 300.00 22.54 266.04 8522.72 8582.22 926.37s 2743.09w 325.88 25.00 268.00 8546.40 8605.90 926.91s 2753.50w 400.00 13.76 324.95 8616.75 8676.25 920.16s 2774.44w 500.00 30.66 31.95 8710.20 8769.70 888.16s 2767.65w 580.42 51.55 45.13 8770.58 8830.08 848.02s 2734.05w §00.00 51.55 45.13 8782.75 8842.25 837.21s 2723.18w 858.03 51.55 45.13 8818.84 8878.34 805.14s 2690.98w 700.00 52.22 60.06 8844.84 8904.34 785.20s 2664.87w 800.00 60.65 92.30 8901.11 8960.61 766.86s 2585.50w 900.00 75.35 118.14 8939.01 8998.51 791.93s 2497.54w 984.09 89.73 137.00 8950.00 9009.50 842.58s 2432.06w 993.89 89.73 137.98 8950.05 9009.55 849.80s 2425.44w D00.00 89.73 137.98 8950.07 9009.57 854.34s 2421.35w 100.00 89.73 137.98 8950.54 9010.04 928.63s 2354.41w 200.00 89.73 137.98 8951.01 9010.51 1002.93s 2287.47w 300.00 89.73 137.98 8951.48 9010.98 1077,22s 2220.52w 400.00 89.73 137.98 8951.95 9011.45 1151.52s 2153.58w 500.00 89.73 137.98 8952.42 9011.92 1225.81s 2086.64w 500.00 89.73 137.98 8952.89 9012.39 1300.10s 2019.69w 700.00 89.73 137.98 8953.36 9012.86 1374.40s 1952.75w 766.81 89.73 137.98 8953.67 9013.17 1424.04s 1908.02w B00.00 89.58 141.29 8953.88 9013.38 1449.32s 1886.53w 900.00 89.12 151;28 8955.01 9014.51 1532.39s 1831.11w D00.00 88.69 161.28 8956.93 9016.43 1623.81s 1790.94w 100.00 88.30 171.27 8959.56 9019.06 1720.80s 1767.25w 114.77 88.25 172.75 8960.00 9019.50 1735.42s 1765.20w 200.00 88.25 172.75 8962.60 9022.10 1819.93s 1754.45w 300.00 88.25 172.75 8965.65 9025.15 1919.09s 1741.84w 400.00 88.26 172.76 8968.69 9028.19 2018.24s 1729.24w 500.00 88.26 172.76 8971.73 9031.23 2117.40s 1716.63w 500.00 88.26 172.76 8974.77 9034.27 2216.56s 1704.03w 700.00 88.26 172.76 8977.80 9037.30 2315.71s 1691.44w 772.76 88.27 172.76 8980.00 9039.50 2387.86s 1682.27w Grid Coordinates Eastlng 695551.30 695540;90 695519.79 695525.75 695558.28 695568.86 695600.21 .695625.78 695704.64 695793.23 695860.00 695866.81 695871.01 695939.88 696008.74 696077.61 696146.47 696215.33 696284.20 696353.06 696399.07 696421.22 696478.80 696521.35 696547.57 696550.00 696562.96 696578.16 696593.37 696608.56 696623.76 696638.95 696650.00 No~hlng 5947458.09 5947457.28 5947463.48 5947495.65 5947536.65 5947547.74 5947580.64 5947601.25 5947621.67 5947598.92 5947550.00 5947542.96 5947538.53 5947466.02 5947393.51 5947321.00 5947248.49 5947175.98 5947103.47 5947030.96 5946982.52 5946957.81 5946876.22 5946785.89 5946689.56 5946675.00 5946590.81 5946492.02 5946393.24 5946294.45 5946195.66 5946096.88 5946025.00 DLS Vedical de~100ff Se~lon Comment 0.00 -861.45 KOP 10.00 -867.13 28.00 -884.89 28.00 -906.80 28.00 -919.55 0.00 -921.92 0.00 -928.96 28.00 -929.76 28.00 -897.98 28.00 -826.03 28.00 -746.58 05-04A T1 10.00 -736.85 0.00 -730.77 0.00 -631.32 0.00 -531.88 0.00 -432.43 0.00 -332.98 0.00 -233.53 0.00 -134.08 0,00 -34.64 0.00 31.81 10.00 64.89 10.00 164.68 10.00 262.26 10.00 354.67 10.00 367.71 05-04A Mid 0.00 442.42 0.00 530.07 0.00 617.73 0.00 705.38 - 0.00 793.03 0.00 880.68 0.00 944.45 05-04AT2 lTD/4 1/2"liner 6/27/97 7:59 AM Page 1 of I i , TONY KNOWLES, GOVERNOR ALASI & OIL GAS CONSERVATION CO IISS ON 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (§07) 279-1433 FA,X: (907) 276-7542 May 16, 1996 Jim C. Abel Engineering Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Prudhoe Bay Unit 5-04A ARCO Alaska, Inc. Permit No. 96-89 Sur. Loc. 2262'FNL, 1182'FEL, Sec. 32. T1 iN, R18E, UM Btmnhole Loc. 3109'FNL, 1310'FEL, Sec. 31, TllN, R15E, UM Dear Mr. Abel: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given bv '~ ' field inspector on the North Slope pager at 659-3607. Daw'd W. Johnston \ Chairm~ BY ORDER OF THE COMMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 i la. Type of Work Drill __ Redrill X I lb. Type of Well Exploratory__ Stratigraphic Test _ Development Oil _ Re-Entry__ Deepen --I Service ~ Development Gas __ Single Zone x__ Multiple Zone _ 2.. Name of Operator 5.Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 69' 3. Address 6. Property Designation P. O. Box 100360, Anchorage, AK 99510-0360 ADL 28326 Prudhoe Ba¥/Prudhoe Bay Oil 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 2262' N & 1182' E, Sec 32, T11N, R15E, UM. Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 809' N & 1419' E, Sec 31, TllN, R15E, UM. 5-04A #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 3109' FNL, 1310' FEL, Sec 31, TllN, R15E, UM. June 10, 1996 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line No Close Approach 10840' MD / 8935' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 9600' MD Maximum hole angle 92° Maximum surface 2800 psig At total depth (TVD) 3500 psig 18. Casing program Setting Depth size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.4 LB0 FL4S 1950' 8890' 8145' 10840' 8935' 30 bbls 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 9945 feet Plugs(measured) PBTD Tagged @ 9793' MD (1/29/96). true vertical 9177 feet Effective depth: measured 9793 feet Junk (measured) true vertical 9038 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 76' 20" 490 Sx PF II 76' 76' Surface 2631' 13-3/8" 5400 Sx PF II 2700' RECEIVED Production 9839' 9-5/8" 1500SxCIG & 125SxPFII 9908' 91 63' Perforation depth: measured 9754-9777' MAY 0 1 1996 true vertical 9002 - 9023' Alas~ 0il & Gas Cons, Commissien 20. Attachments Filing fee x_z_ Property plat__ BOP Sketch _~x Diverter Sketch _ Drilling program x~ Drilling fluid program __ Time vs dept~..~lot _ Refraction analysis w Seabed report _20 AAC 25.050 requirements _ 21. I~hereby certify that the foregoj~ is trt~ aJld~'~ ~~'~' correct to the best of my knowledge Signed,.,, ! C '-----,,.../ -- ~' Titlle Engineering Supervisor Date J~ Commission Use Only P/~rmit N~'nber _ I APl number ~ Approval date I See cover letter for / I ~-/('~'~'~I, other requirements Conditions of approval Samples required .~Y e s ,~ N o Mud Icg required Y e s Hydrogen sulfide measures ~ Y e s__ N o Directional survey required __ N o Required working pressure forBOPE m2M; __ 3M' __ 5M' __ 1 0M' __ I 5 M 7-~ 3500 psi for CTU Other: Original Signed By ~... Approved by David W, Johnston Commissioner the commission Date Form 10-401 Rev. 7-24-89 Submit in triplicate DS 5-4A CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore. Directionally drill a horizontal well from the existing wellbore. Complete with 2-7/8" cemented liner. Intended Procedure: Cement squeeze the current perforations and plugback the existing completion to - 9570' md. Mill window in 9-5/8" casing at-9600' md. Drill 10' of formation and perform Leak off test to 0.5 ppg above the highest anticipated mud weight. Build angle to -92°. Directionally drill 3-3/4" x 1250' horizontal well to access Zone lB reserves. Run and cement 2-7/8" liner to TD. Perforate selected intervals. Place well on production. April 29, 1996 C T Drilling Wellhead Detail ~ CT :ri.lector Head MeU~anol Injection Otis 7' WLA Quick C~ct -- 7-1/16', 5M Rain Type OuaJ ~ Gate BOPE 2' Pump-ln ~~~.~~ Stuffing Box (Paclc-Off), 10,000 psi Working Pressure -- 7 R~ser I I I ~ I' j[~ Cutters or Cc~nbina$ion Cutter~linds ~ Slip / Pipe rarr~ Annular BOP (Hydril),7-1/16' ID 5,000 psi working press~xe AIIga~ent Guide Flaxt R~n Type ~ Gate BOPE 7-1/16" ~) w~th Pipe/Slip Rams Flat, ed Fire Resistant Keay Hose To DuaJ \ ChokeMandeld HCR MarmaJ Ma~ter Valve 0.458' rl Manual Valves DdllJng spool 7-1/16', 5M by 7-1/16', 5M fTubing Hanger g--SiS* Annulus 13-3/8' Annulus ~Fire Resistant Kelly t-,~:~se to Flange by Hamm~ Up 1/4 Turn Valve on DS Hardline 1 O' from Tree RECEIVED BAY 0 1 1996 Naska 0il & Bas Cons. Comm~ss'me Anchorage R~C~IV~D MAY 0 ~ 19g~ Alaska Oil & Qas Cons. Commission Anchoral~e ITl CD CD Tiger Tank Open Top Tank Open Top Tank 5-1/2-" AVA POGLMs ID =Z.34" 9-5/8" Baker SAB Pkr. 4-1/2" Otis 'X', 3.813" ID 4-1/2_" Tubing tail Original perforations cement sqz'd. DS 5-4A PROPOSED CTD COMPLETION 8869' 8942' 9006' 5-1/2" L80 Tubing 5-1/2" Otis RQ SSSV nipple (4.562_" ID) 5-1/2_" Otis XN nipple ID = 4.455" 4-1/2-" GS FN on top of liner @ .~--8940' Window Cut in 9-5/8" casing with CT. ~ 9600- 9605' 3-3/4" Open hole Z-7/8' FL4S liner TD @ ± 10850' 9-5/8" Casing Shoe @ 9908' ST-00G.XLS 4Ill96 3:24 AM D ~,i~co ~ B SIDETRACK PLAN PREPARED F01i STEVE WARD [PE-ARCO)M,rch 31, 1998 l~ [~"~., [~ I V VERTICAL SECTION USEDi "17-47:~? R~iative to true Nort,~l ~ i~t~,¥ n ~---~96 ...... RKB .......... I ' 83' . ........... ~. .............. .............. I , ' NOTE i ....... i-'~lative Coordinates are off of true North/ASP are relative to grid North .~IJaska-0il & Gas Cons. Com.,m.!sSl0ll t : : ' Arlchoral;lL ............. ! .. , ! . , _ ........... i ...... I -~ r.c. D~; -'§§-6i~ VSI ~:~ ...... i~t'-~ ..... ~i~ ........ ~ ' ~i'; AS~' Y iAS~',X Com_m~ i"'o' d~:. .... '"~ ..... ~ rtI ~ ........... ~'~"~i~ a;~-~:-a;~i06...~t' ~tt ~ I ;, ' ! ........ ~).~ 22.8'285.1 8684.2~ .._o.-_o.i -931.0 -2807.0 0.0' ' '010 .............. 6~ 5947451.5i 895487.5~1. rie In Point 9480.0, 22.8, 26{J.1' 8688.8 -0.6! -931.1 -2808.9! 0.0. 0.0 0,0 "'~9;4~;{5iJ~!,. ' 895485.6~' .... -~- ....................... t ..... 9510.0 221~! 265.1 8716.4 -4.01 -932.1 -2820.51 010' ' .......... 0.0 0.0 5947450.0 695474.0 9540.01 ~-~'.~I ....... 265.,1 8744.1 '7.5! '--;~§3-.'{ .... ~-2~321~! -'C~i0 ......... ~3D' ........... ~.~ 5947448.51 695462.4 '9-~00~ ......... ~-2~'§~ .... 265.!i 877~.?I ......~1'.~! -934.~ -2~.7' 0.0 0.0 .....~i~)- '"~,~;~1~'.$'.{~95450,9' ........ ~000! ~.~.8 205.a8700.a - .. _:~....:~ ;._ ,__~__ . . '"'6.6' ~947440.0: ~9~39.a 2. 9620.0[ ..... 27.7 273.4' 8817.5 -16.3. -935.2 -2863.8: 24.3 41.6 30.0 5947446.0 ~9~(J18 3. Start 32°/10~3 9630'01 28.9 279.6; 8826.3 --18.81 ' ':9~7--:~7~i' 12.4 62,3 ....... 320'"5947446.0 695426.1 build. 3~1'i"~";----~'9-~.,~! 885-~.9 '-~'~.~,~-9~9.9_~ ,2883.3[ 17.2; 52.0, 32.0i' ~174~.-,~ ~~i~ ............. ...... 7 ::-:-' ',.o.o .... ............. .............. ........ .......... ~'~;~,~ 5612 '~221i*T 0915.6~ 14.9 -888.8j -2930.1; ' 2~.~ ....... 22.5~' ~3~.01 "59474{J0':'~; ...... -~~:'3~ .................... §~8-~: '~5 327.7~ 89304; 32.5 .... :~1~-4: --~-9~'§i ~ {~.~ ......... ~.'0~ 5~?~i.5~ 69~7.~ ' ~'~; .... ~';~ 332.5 B~1,3'. 53.2 -~3.2~, -29~.9; 28.3' 16. i' 32.0' 5~7535.0;' 095333'.3 9809.5 ~.0~ ~1.1 8950.1[ 1~,8 .-709.4 -2~1.9 20.0 14 1~ 320' 5~7~0,5 ~700 "~0/"- ~'-~'T---~'l'i ' 101 3; -78891 ':2~2'i ............ ~'~: ....... ~38: ....~38~ 5~7~9'0,.'-~~~' --~-~ ........ ' , - .... .~- .... .i ~--' .... , ............... ' ......... ' -. : ........... '. : ........ '.-~.-- ' ~ .......... ~.0 ~.0~ ~5.3J 89~.1 127.~? -7~.2~ -2~.8 0.1~ 13.8 13.8~ 5~7617.5~ 6952~.3 ~* ~.0~ '*~9.4; 8950;1 .... ~;~ ......-~6~--;~*~--~;~-~~~ ~': ...... ~~.5~ .... 695291.9'. ' . 13.8. 13.8 5~7676.0~ 8952~.8 ~0.0 ~. 1 353.6 8950.1 182.7~ -701.3 -~01.8 0.1 .................................... ~ 2 ST-00G.XLS 411!96 3:24 AM 9990.0 90.1, 357.7', 8950.0 211.4 -671.3i -3004..0 0.1 13.8 - 'ioo04.2-'T-"9--0-.11 359.7! 8950.0 225.2' -.657.2i -3004.4 0.1 13.8 ........ ..... 0.3 10050.01 ~.2! 4.3 8949.§ 270.2 -6ii.4i -..3~).0.2._7_1' '" 0.$' ..... ---i~'.i~i 10080.0! 90.3 .... 7.4 8949.7 300.0: -~§i.~ -2999.7i '-':-' d.~ 10,1i 13.8 5947706.0'~ 695283.7'i '{§.8 594~720..0__L. 69_~.~83:01~: SOL re.a .ched ..... ' 10.1 5~'.-d;' 695282.81 10.1 ~ 695-'-~_.2.'~.~.~i-ii ............ 10,1. 5947795,5 695285,7. -1~J~2,0.0" 90.5 13.~, ...... 8949.3 '3~.6 "':~-~'.~-T2§~8.9[' 0.3i 10.1' i0.1 .... ~{[4'~'~,~.~ 695294.9 · 10~0.~" ~.6 16.5~ 8~9.1 ..... ~9 9; ~"~:':~i:~]' - ~-~' ........ -~"~'" '~'~:6' -~0.4'_._ ~' . · ~ ...... . .......... :~ ....: .... ~o.i;- 5~7~.0' ~96301.9.-- ~ I 5 - ~ ............ ~ ..........., . . .......... .... ~ i -~" ............ ~ ..........: ':- ~ e' a~ ~ ~S. CO~i~i~ 10260.0t 256: 8~8.0 478.8 ~9.7 -2~.9 0.3' 10.1' ~:~ o -102~0,0 -~.'9: 28.6 8~7.6 ~:~ -:~J~:2~5:2' 0.2:' 10.1' ''~:,~., -"~~'~o,.~.ui ~1.~695~.9~ '-~~:::~o~,ge_. ~ 10320.0' ~:~ ........ ~i.7: 8~7,1 {~.i '-357.0i-2920.1 0.2: 10.1 ~O. iT ~2~,~ .... ~TJ; ........ .... 10.1~ ~8~s.o: S953~ ......... i~:~ ......91:1 ' 37.7 ._ 8~:~ 591.9, -307,7 -2~.'~ .... 0:2_: .......... 10..1 1~10.0j 91.1. 40.8~ ~5.5~ ........ 618.6:' ........ -2~.5~ -2867,1 0.2 10.1 :~:~[ ~i.~:~ '.':." .' '. l~O.~j "91.2~, 43:'~:'. 8~.~t ~:6' -26~:3' :~.~" 0.2 10.1 10.1' ~8119.0j 69~30.0'1 ~ 1~70.0 ~1:~:~. '.~.8;. 8~;~'~ .......... ~9.8 -241:~ -2825.6 ............ 0.~- .... 10.1 10.1= ~8140.5 69~50.8~ ~: .... c ---~05~.0 - ................................ ~ 91.3~ 49.9~ 8~3.6~ 6~.0 -~1.3 -2803.1 0.2 10.1 10.~ ~8161.0 69~72.7; " ~ .......... : ~ ~ ...... ~ ....... ~ ; ~0~.0 ~ 55.g~ 8~2.~.," 739 6: -185.1-2755.3 0.1 10.1 10. i' 5~819~.5~ "~b'~i6:~ ......... ~ ~ -~05~.0: 91.4 59.0 8~1.5 7~.8 :~6g.~ .... -i~'~ .......... 0,'1 ..... 10.1 10. i' 5~8215.0', .... 695~.4 '~ .... ~ 1'~2~.~ ~i.5: "6'2:6 ......... ~.7 .........7~:8 -1~.2 -2703.9 0,1 10.1' ~'~-O:'i ...... ~~0,~~ ..... ~5570.1~ ', ......... ;. ~ 1~50.0~ ~ 65.1' '8~9.9. 7~:'6 :i~.9 -2677:1'~ ........ 0.1 101 10.1 5~8245. D 6955~.6~ ; c "1~80,0~: ..... ~1.5~ 68.1 ..... 8939.1 817.1 -128.S -2~9.6: .... -~:~- ...... 10:1' 10.1 5~8257,5 69~23.8.[ ! ........... 10710,0~ 91,6' 71,1' 89~.3: '-833:4 _118.5:2~2~.'5r ..... 0.1 10.1 10.1. 6~8268.5 69~51.6:. c 10740.0 -- 91.6'~ 74.2~ 89~:~T ~8.2 -1~,5 -2592.~' 0.1t i~, 1~ 10:i~:- '~8278.5 69~9:g~ ..... ~ ' ~ I08~.o, 91 ' "~:ij ....... ~g~'gl 873.7' '-~:J!"'¥~'.4:' QO: 10.1: 10.1J 5~293.0' 6g~'~3~'~ ~ 10830.0i ~i~.' .... ~:~'~ '~935.0~ ~,3 ..... :~r ':~~-~~~-0:1;-'~':1i' ~2~8b: ~767,6i ............~' DRILE _ IIIII ._ I Ill III Iii ARCO ALASKA INC. 5-04 SIDETRACK PLAN ALASKA III I IIIII I I I I I I I ARCO ALASKA INC. .~T-OOT Plan ~Idetrach In trt~ c. oo~d 5.~ITRLI · Original Weilbofe RECEIVED 8600· ... .. -. -.. 8700 ....... 8800 . . ... · , 8900 --'- -. ..- .. ~ Tie in Point 94?5 MD 888a, ~ 22 8' 2 ) DI 39" ! IX) Tf 40' KOP ~ MO ~7~ 88 Original Wetl Bore 9000 ....... ----'~'~ EOB ........... i iii l 5.) D{ 10.1~'1t00 T~ ~.4' ~L 1~ MO I I II I I I lull NO~ Rel. to True True · III II I ,,, .~--- R) lq) 8934.? .q~ MD 101~12 94&' Vertical Section Scale I in=h: 100 ft PLANE OF VERTICAL SECTION 12.37° REFERENCED TO TRUE NORTH File Name: c:~arcoalk~6-O4~6-04al.plo Drawn By ' i~imo Hadlpu~'o Date : March 31. 1996 · WELL PERMIT CHECKLIST COMPANY FIELD & POOL INIT CLASS I- ~,l'// - 'GEOL ,~REA ' <;~'~,O UNIT# / ////~'~,5"~:::~ ON/OFF SHORE ADMINISTRATION . 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. ,/,~ D/~TE / 12. Permit fee attached ....................... Y ~ Lease number appropriate ................... N Unique well name and number .................. N Well located in a defined pool .................. N Well located proper distance from drilling unit boundary .... N Well located proper distance from other wells .......... N Sufficient acreage available in drilling unit ............ N If deviated, is wellbore plat included ............... N Operator only affected party ................... N Operator has appropriate bond in force ............. N Permit can be issued without conservation order ........ N Permit can be issued without administrative approval ...... N Can permit be approved before 15-day wait ........... N ENGINEERING 14. Conductor stringprovided ................... Y N 15. Surface casing protects all known USDWs ........... Y N 16. CMT vol adequate to circulate on conductor & surf csg ..... Y N 17. CMT vol adequate to tie-in long string to surf csg ........ Y N 18. CMT will cover all known productive horizons .......... (.~.- f~"~ N" 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. ~ N 23. If diverter required, does it meet regulations .......... Y N 24. Drilling fluid program schematic & equip list adequate ..... (~ N 25. BOPEs, do they meet regulation ~ N 26. BOPE press rating appropriate; te'st't ' ' ' Csigl N 27. Choke manifold complies w/APl RP-53 (Ma~-84) ........ ~' N 28. Work will occur without operation shutdown ........... ~ N 29. Is presence of H2S gas probable ................. N GEOLOGY / 30. Permit can be issued w/o hydrogen sulfide measures ..... ~YY N ,-"/'d~J/p./~/7 31. Data presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ............. 33. Seabed condition survey (if off-shore) ............ /// Y N 34. Contact name/phone for we.eklyproclress reports ..... ~.. Y N lexpiora-tory only] GEOLOGY: ENGINEERING: JDH ~ COMMISSION: Comments/Instructions: HOW/Ijt - A:\FORMS\cheklist rev 09/97 STATE OF ALASKA ALASKA _AND GAS CONSERVATION CO, IISSION APPLICA' 'ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon X,. Suspend Operation shutdown Alter casing Repair well Plugging X Change approved program Pull tubing Re-enter suspended well Time extension Stimulate Variance Perforate 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service X 4. Location of well at surface 2262' N & 1182' E, Aec. 32, TllN, R15E, UM. At top of productive rCn'n{erval 809' N & 1419' E, Sec. 31, T11 N, R15E, UM. At effective depth At total depth 795'N & 1630' E, Sec. 31, T11N, R15E, UM. Other 6. Datum of elevation(DF or KB) 69' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 5-04 9. Permit number 74-59 10. APl number 50 - 029-20152 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9945 feet 9177 feet Effective depth: measured 9793 feet true vertical 9038 feet Casing Length Plugs(measured) PBTD Tagged @ 9793' MD (1/29/96). Junk(measured) Size Cemented Measured depth True vertical depth Conductor 76' Surface 2631' Production 9839' 20" 13-3/8" 9-5/8" 490 Sx PF II 76' 76' 5400 Sx PF Il 2700' 2700' 1500 Sx G & 125 Sx PF II i~ ~ ~f'V ~0 9163' Perforation depth: measured 9754 - 9777' true vertical 9002 - 9023' '.,.~A¥ 0 ~ 1996 0il & Gas Cons. C0mmtrsston Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, NPCT @ 8881' MD; 4-1/2", 12.6#, MN-80, NPCT @ 9006' MD. Packers and SSSV (type and measured depth) Baker SAB Packer @ 8869' MD; Otis RQ SSSV @ 2197' MD. 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch x 14. Estimated date for commencing operation June, 1996 16. If proposal was verbally approved Oil X Gas Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Status of well classification as: Suspended Engineering Supervisor Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- I Approval No. ~-~(¢, - O ~ ~ Approved by order of the Commissione~;'~.~ (,/t,.~ '~ ~""~ Form 10403 Rev 06/15/88 Commissioner Date ~: -- SUBMIT IN TRIPLICATE ~_e,~ ,r--,~,,-~--,r-- Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Tue Jan 13 10:56:10 1998 Reel Header Service name ............. LISTPE Date ...................... 98/01/13 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/01/13 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN · Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 AK-MM-80022 D. LABRECQUE S. WHIPP Date D.S. 5-04A 500292015201 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 13-JAN-98 MWD RUN 3 MWD RUN 4 AK-MM-80022 AK-MM-80022 D. LABRECQUE D. LABRECQUE W. STAFFORD W. STAFFORD JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: MWD RUN 5 AK-MM-80022 S. LAITILA W. STAFFORD 32 liN 15E 2262 4096 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 61.00 59.60 34.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2700.0 2ND STRING 9. 625 9137.0 3RD STRING 8. 500 4. 500 12338.0 PRODUCTION STRING 6.000 12338.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY. 3. MWD RUN 2 THROUGH 5 ARE DIRECTIONAL WITH NATURAL GAMMA RAY PROBE (NGP) UTILIZING SCINTILLATION DETECTOR. 4. DEPTH SHIFT/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN T FISCHER OF ARCO ALASKA, INC. AND M MUNYAK OF SPERRY-SUN DRILLING SERVICES ON 01/07/98. 5. MWD RUNS 2 THROUGH 5 REPRESENT WELL 5-04A WITH API#: 50-029-20152-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12338'MD, 9059'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximu/n Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9106.0 12275.5 ROP 9167.5 12338.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ EQUIVALENT UNSHIFTED DEPTH MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 2 9166.0 9711.0 3 9711.0 10306.0 4 10306.0 11499.0 5 11499.0 12338.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT GR MWD ROP MWD Units Size Nsam Rep Code Offset Channel FT 4 1' 68 0 1 AAPI 4 1 68 4 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9106 12338 10722 6465 9106 GR 30.335 813.395 78.1078 6338 9106 RO? 4.0557 2264.06 60.1313 6342 9167.5 Last Reading 12338 12274.5 12338 First Reading For Entire File .......... 9106 Last Reading For Entire File ........... 12338 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9106.0 ROP 9167.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9649.0 9709.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 27-NOV-97 ISC 5.07 ISC 5.07 2.01 / 6.90 MEMORY 9711.0 9166.0 9711.0 23.5 66.3 TOOL NUMBER ?CG 67 6.000 6.0 QUIKDRILL N 8.30 500.0 9.0 25000 10.0 .000 .000 .000 .000 6.9 TOOL STANDOFF (IN): .6 EWR FREQUENCY (HZ): # REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 AAPI 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9106 9709.5 9407.75 1208 9106 GR 31.4592 813.395 73~4171 1087 9106 ROP 5.2312 176.421 48.4564 1085 9167.5 Last Reading 9709.5 9649 9709.5 First Reading For Entire File .......... 9106 Last Reading For Entire File ........... 9709.5 File Trailer Service name. ............ STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9656.5 ROP 9713.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10251.5 10306.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OKMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 29-NOV- 97 ISC 5.07 ISC 5.07 2.01 / 6.90 MEMORY 10306.0 9711.0 10306.0 60.7 89.8 TOOL NUMBER PCG 47 6.000 6.0 QUIKDRILL N 8.70 49.0 8.3 22000 6.0 .000 .000 .000 .000 9.6 .6 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 AAPI 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3· First Name Min Max Mean Nsam Reading DEPT 9656.5 10306.5 9981.5 1301 9656.5 GR 30.335 216.064 82.521 1191 9656.5 ROP 4.1789 2264.06 65.4872 1188 9713 Last Reading 10306.5 10251.5 10306.5 First Reading For Entire File .......... 9656.5 Last Reading For Entire File ........... 10306.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10252.0 ROP 10308.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (R?M): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 11436.0 11498.5 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: ' MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHM]VI) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT'MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: (IN): NEUTRON TOOL .MATRIX: MATRIX DENSITY: HOLE CORRECTION TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 03-DEC-97 ISC 5.07 ISC 5.07 2.01 / 6.90 MEMORY 11499.0 10306.0 11499.0 86.5 96.3 TOOL NUMBER PCG 47 6.000 6.0 QUIKDRILL N 8.70 50.0 8.6 27000 5.2 .000 .000 .000 .000 56.3 .6 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DE?T FT 4 1 68 0 1 GR MWD 4 AAPI 4 1 68 4 2 ROP MWD 4 FT/H 4 1' 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10252 11498.5 10875.2 2494 10252 GR 38.7794 272.531 78.9971 2369 10252 ROP 4.0557 970.312 59.4499 2381 10308.5 Last Reading 11498.5 11436 11498.5 First Reading For Entire File .......... 10252 Last Reading For Entire File ........... 11498.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW ~{WD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11438.0 12274.5 ROP 11501.0 12338.0 $ LOG HEADER DATA DATE LOGGED: 05-DEC-97 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMS4) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EwR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined ~kbsent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 ISC 5.07 ISC 5.07 2.01 / 6.90 MEMORY 12338.0 11499.0 12338.0 80.0 91.3 TOOL NUMBER PCG 67 6.000 6.0 QUIKDRILL N 8.80 53.0 8.5 26000 5.0 .000 .000 .000 .000 60.9 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 AAP I 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 Name Min Max Mean Nsam DEPT 11438 12338 11888 1801 GR 45.111 217.108 77.0366 1674 ROP 7.7925 1664.74 64.9511 1675 First Reading 11438 11438 11501 Last Reading 12338 12274.5 12338 First Reading For Entire File .......... 11438 Last Reading For Entire File ........... 12338 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/13 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/01/13 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN' Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 98/01/13 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File LIS Tape Veritication Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: **** REEL HEADER **** SERVICE NAM~ : EDIT DATE : 97/12/30 ORIGIN : FLIC REEL NAM~ : 97575 CONTINUATION # : PREVIOUS REEL : CO~T : ARCO ALASKA INC., D.S. 5-04A, PRUDHOE BAY, API #50-029-20152-01 **** TAPE HEADER **** SERVICE NA~IE : EDIT DATE : 97/12/30 ORIGIN : FLIC TAPE NAFiE : 97575 CONTINUATION # : 1 PREVIOUS TAPE : CO~IENT : ARCO ALASKA INC., D.S. 5-04A, PRUDHOE BAY, API #50-029-20152-01 TAPE HEADER PRUDHOE BAY OPEN HOLE WIRELINE LOGS WELL NAFiE : API NUFiBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: RUN 1 97575 D. PALMER CRU~LEY TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING D.S. 5-04A 500292015201 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 30 -DEC - 97 RUN 2 RUN 3 .......... 32 liN 1SE 2262 4096 61.05 59.55 34.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 9.625 9135.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ 3RD STRING PRODUCTION STRING THIS TAPE CONTAINS THE LDWG EDIT FOR THE ARCO ALASKA WELL D.S. 5-04A PEX/AIT. THIS LOG IS CONSIDERED THE PRIMARY DEPTH CONTROL FOR THE SIDETRACK AND NO DEPTH SHIFTING WAS PERFOPuViED. IN THE FIELD THIS LOG WAS TIED INTO THE GR FROM THE ORIGINAL HOLE. LOG DEPTHS MEASURED FROM THE ORIGINAL KB (51 . 5 ' ABOVE PERM. DATUM) . $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 0 O1CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFiBER: 1 EDITED OPEN HOLEMAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREIVlENT : 0.5000 FILE SUi~4ARY LDWG TOOL CODE .............. PEX AIT $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (IVIEAS~ DEPTH) START DEPTH STOP DEPTH ..................... 10280.0 9150.0 10280.0 9195.0 BASELINE DEPTH .............. $ MERGED DATA SOURCE LDWG TOOL CODE .............. $ REMARKS: .......... EQUIVALENT UNSHIFTED DEPTH .......... PEX AIT .............. RUN NO. PASS NO. 14~RGE TOP MERGE BASE ................... THIS FILE CONTAINS THE CLIPPED DATA FOR THE ARRAY INDUCTION TOOL (AIT) , AND PLATFORM EXPRESS THREE DETECTOR DENSITY AND COMPENSATED NEUTRON. THE DATA IN THIS FILE WAS ACQUIRED OVER THE OPENHOLE SECTION OF THE LOGGING RUN. $ LIS Tape Veri£lcation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 108 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) ....................................................................................... DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 1 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 1 1 1 4 68 0000000000 TEND AIT LB O0 000 O0 0 1 1 1 4 68 0000000000 FIRES AIT OH~4~ O0 000 O0 0 1 1 1 4 68 0000000000 MTEMAIT DEGF O0 000 O0 0 1 1 1 4 68 0000000000 DEV AIT DEG O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 NCNTCNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000 CPHI CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000 CALl SDN IN O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN BN/E O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000 MSFL SDN OH~4~ O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: NAlVlE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~I CODE (HEX) MINVSDN OH~E4 O0 000 O0 0 1 1 1 4 68 0000000000 ~NOR SDN OH~E~ O0 000 O0 0 1 1 1 4 68 0000000000 AFiO AIT OH~E~ O0 000 O0 0 1 1 1 4 68 0000000000 AF20 AIT OHI~ O0 000 O0 0 1 1 1 4 68 0000000000 AF30 AIT OH~ O0 000 O0 0 1 1 1 4 68 0000000000 AF60 AIT OH~ O0 000 O0 0 1 1 1 4 68 0000000000 AFgO AIT OP~ O0 000 O0 0 1 I 1 4 68 0000000000 ** DATA ** DEPT. 10280.000 GR.AIT -999.250 TENS.AIT FL~ES.AIT -999.250 MTEM. AIT -999.250 DEV. AIT CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT NRAT. CNT -999.250 NPHI. CNT -999.250 CPHI.CNT DRHO. SDN -999.250 PEF. SDN -999.250 RHOB.SDN MINV. SDN -999.250 f~NOR.SDN -999.250 AFiO.AIT AF30.AIT 10.909 AF60.AIT 13.573 AF90.AIT DEPT. 9150.000 GR.AIT 48.405 TENS.AIT ~RES.AIT 0.066 MTEi~.AIT 160.017 DEV. AIT CFTC. CNT 884.046 FCNT. CNT 914.955 NCNT. CNT NRAT. CNT 2.418 NPHI.CNT 22.892 CPHI.CNT DRHO.SDN 1.373 PEF. SDN 10.000 RHOB.SDN MINV. SDN 0.137 FiNOR.SDN 0.068 AFiO.AIT AF30.AIT -999.250 AF60.AIT -999.250 AFgO.AIT 1899 000 TEND.AIT -999 250 CNTC. CNT -999 250 CRAT. CNT -999 250 CAL1.SDN -999 250 MSFL.SDN 8 327 AF20.AIT 10.456 1415.000 TEND.AIT 22.853 CNTC. CNT 1960.242 CRAT. CNT 24.540 CAL1.SDN 4.550 MSFL.SDN -999.250 AF20.AIT -999.250 562.977 -999.250 -999.250 -999.250 -999.250 6.491 828. 061 2070.123 2.284 8. 732 O. 068 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAFiE : EDIT .001 SERVICE ' FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verii~ation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5_ PAGE: **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NU~IBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS AU]M~ER : 1 DEPTH INCREIVlENT: 0.5000 FILE SUMMARY LDWG TOOL CODE .............. PEX AIT $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 9150.0 9014.0 9150.0 9014.0 BASELINE DEPTH .............. $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... PEX AIT THIS FILE CONTAINS THE CLIPPED DATA FOR THE PLATFORM EXPRESS COMPENSATED NEUTRON (CNT) TOOL. THE DATA IN THIS FILE WAS ACQUIRED ONLY OVER THE CASD HOLE SECTION OFTHIS LOGGING RUN. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 1 5 66 LIS Tape Verifxcation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5. PAGE: TYPE REPR CODE VALUE .............................. 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LO~ TYPE CI.~SS MODNUI~ S~vlP ELEbl CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 2 1 1 4 68 0000000000 TEND AIT LB O0 000 O0 0 2 1 1 4 68 0000000000 GRCH AIT GAPI O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CArT CPS O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9150.000 TENS.AIT 1415.000 TEND.AIT 828.061 GRCH.AIT CNTC. CNT 2070.123 CFTC. ClTT 884.046 FCNT. CNT 914.955 NCNT. CNT CRAT. CNT 2.284 ArRAT. CNT 2.418 NPHI.CNT 22.892 CPHI.CNT DEPT. 9014.000 TENS.AIT -999.250 TEND.AIT -999.250 GRCH.AIT CNTC. CNT -999.250 CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT CP~T. CNT -999.250 NRAT. CNT -999.250 NPHI.CNT -999.250 CPHI.CNT 48.405 1960.242 24.540 87.695 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5= PAGE: **** FILE TRAILER **** FILE NA~E : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : TOOL STRINGNUM~ER: PASS NUMBER: DEPTH INCREFiENT: FILE SUMFLARY FILE H~ER FILE NUM~ER 3 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 1 1 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... PEX 10280.5 9150.0 AIT 10280.5 9150.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELEMETRY CARTRIDGE 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 TOOL NUMBER TCC-B LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ HILTB-DTB HRCC-B- 849 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 6.000 9135.0 9135.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OP~4~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERAIVJRE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 0.199 57.0 O. 212 57.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): O. 5 REMARKS: ************ RUN 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) C~ DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS FILE CONTAINS MAIN PASS RAW DATA SAMPLED AT O. 5' $ LIS FORMAT DATA LIS Tape VeriL.cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5= PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 140 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 7 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 00 000 00 0 3 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 3 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 3 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 3 1 1 4 68 0000000000 FLEES AIT OH~f O0 000 O0 0 3 1 1 4 68 0000000000 MTEMAIT DEGF O0 000 O0 0 3 1 1 4 68 0000000000 GDEVAIT DEG O0 000 O0 0 3 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 3 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 3 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 3 1 1 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 3 1 1 4 68 0000000000 I{DRAPEX G/C3 O0 000 O0 0 3 1 1 4 68 0000000000 PEFZ PEX O0 000 O0 0 3 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 H~IN PEX OH~M O0 000 O0 0 3 1 1 4 68 0000000000 t{MNOPEX OPff4~ O0 000 O0 0 3 1 1 4 68 0000000000 RXOZ PEX OI~4M O0 000 O0 0 3 1 1 4 68 0000000000 RX08 PEX 0t~4~ O0 000 O0 0 3 1 1 4 68 0000000000 AFiO AIT OHFff~ O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verit~¢ation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5= PAGE: 10 NAME SERVUNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) AF20 AIT OHFIPI O0 000 O0 0 3 1 1 4 68 0000000000 AF30 AIT OHM~ O0 000 O0 0 3 1 1 4 68 0000000000 AF60 AIT OH~ O0 000 O0 0 3 1 1 4 68 0000000000 AF90 AIT OH~I~ O0 000 O0 0 3 1 1 4 68 0000000000 ATiO AIT OHIViPI O0 000 O0 0 3 1 1 4 68 0000000000 AT20 AIT OPilW~I O0 000 O0 0 3 1 1 4 68 0000000000 AT30 AIT OH~IM O0 000 O0 0 3 1 1 4 68 0000000000 AT60 AIT OHPIPI O0 000 O0 0 3 1 1 4 68 0000000000 AT90 AIT OH~I~ O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10280.500 GR.AIT 81.818 TENS.AIT 1774.000 HTEN. AIT FiRES.AIT 0.070 MTE~.AIT 181.421 GDEV. AIT -999.250 CNTC. PEX CFTC.PEX 2116.429 RCFT. PEX 2116.429 RCNT. PEX 3948.508 TNRA.PEX RTNR.PEX 1.831 TNPH.PEX 19.125 NPHI.PEX 18.489 NPOR.PEX HCAL.PEX 6.415 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX DPHZ.PEX 60721.211 H~IN. PEX 0.128 H~VO. PEX 0.046 RXOZ.PEX RXO8.PEX 0.030 AFIO.AIT 8.321 AF20.AIT 6.490 AF30.AIT AF60.AIT 13.562 AF90.AIT 10.445 ATiO.AIT 8.294 AT20.AIT AT30.AIT 9.109 AT60.AIT 13.937 AT90.AIT 10.416 DEPT. 9150.000 GR.AIT 48.405 TENS.AIT 1415.000 HTEN. AIT f~tES.AIT 0.066 MTEM. AIT 160.017 GDEV. AIT 22.853 CNTC. PEX CFTC.PEX 884.046 RCFT. PEX 914.955 RCNT. PEX 1960.242 TNRA.PEX RTATR.PEX 2.418 TNPH. PEX 24.540 NPHI.PEX 22.892 NPOR.PEX HCAL.PEX 8.732 RHOZ.PEX 4.550 HDRA.PEX 1.373 PEFZ.PEX DPHZ.PEX -115.141 P~IIN. PEX 0.137 HFINO. PEX 0.068 RXOZ.PEX RXO8.PEX 0.063 AFiO.AIT 0.484 AF20.AIT 0.208 AF30.AIT AF60.AIT 0.613 AFgO.AIT 317.104 ATiO.AIT 1.668 AT20.AIT AT30.AIT 0.169 AT60.AIT 0.117 AT90.AIT 0.117 542 039 3948 507 1 831 19 125 -999 250 0 030 10 913 6.466 828.061 2070.123 2.284 26.396 10.000 0.068 0.189 0.545 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO I~ST FILE : LIS Tape Veri£1cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 11 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUM~ER 4 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.25000 VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 10280.5 9150.0 AIT 10280.5 9150.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER TCC TELEMETRY CARTRIDGE TCC-B PEX PLATFORM EXPRESS HILTB-DTB PEX PEX CARTRIDGE HRCC-B- 849 GR GAM~A RAY GLS-VJ-1932 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 6.000 9135.0 9135.0 LIS Tape Veri£~cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 12 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OPiM~) AT TEMPERATURE (DEGF): MUD AT MEASLHAED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 0.199 57.0 0.212 57.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 0.5 REMARKS: ************ RUN1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRE1FTDRILL FLOOR 10 FTABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITHRANWITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS FILE CONTAINS MAIN PASS RAW DATA SAMPLED AT 0.25' $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 O. 25 9 65 FT 11 66 23 LIS Tape Veri£~Cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 13 TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 AFiO AIT 0I-!~ O0 000 O0 0 4 1 1 4 68 0000000000 AF20 AIT OHlVlM O0 000 O0 0 4 1 1 4 68 0000000000 AF30 AIT OHlVi~ O0 000 O0 0 4 1 1 4 68 0000000000 AF60 AIT OHIvlM O0 000 O0 0 4 1 1 4 68 0000000000 AF90 AIT OH~I~ O0 000 O0 0 4 1 1 4 68 0000000000 ATiO AIT OHI~ O0 000 O0 0 4 1 1 4 68 0000000000 AT20 AIT OHPllVl O0 000 O0 0 4 1 1 4 68 0000000000 AT30 AIT OHPI~ O0 000 O0 0 4 1 1 4 68 0000000000 AT60 AIT OHI%~ O0 000 O0 0 4 1 1 4 68 0000000000 ATgO AIT OHP1PI O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10280.500 AFiO.AIT 8.321 AF20.AIT 6.490 AF30.AIT AF60.AIT 13.562 AF90.AIT 10.445 ATiO.AIT 8.294 AT20.AIT AT30.AIT 9.109 AT60.AIT 13.937 ATgO.AIT 10.416 10.913 6.466 ** END OF DATA ** **** FILE TRAILER **** FILE NAFiE : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC~1997 16:5~ PAGE: 14 **** FILE HEADER **** FILE NAFiE : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INC~: 0.1667 FILE SUA~NL~Y VENDOR TOOL CODE START DEPTH PEX 10280.5 AIT 10280.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIPiE CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPPiR) : STOP DEPTH 9150.0 9150.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELEMETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 TOOL NUMBER TCC-B HILTB-DTB HRCC-B-849 6.000 9135.0 9135.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 15 MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~IM) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT): MUD CAKE AT (MT): MUD CAKE AT (BHT): (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 0.199 57.0 0.212 57.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: ************ RUN 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS FILE CONTAINS MAIN PASS RAW DATA SAMPLED AT 0.1667' $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 28 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 16 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUF~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 5 1 1 4 68 0000000000 HI)RA PEX G/C3 O0 000 O0 0 5 1 1 4 68 0000000000 PEFZ PEX O0 000 O0 0 5 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 5 1 1 4 68 0000000000 HI, INPEX OHlV~l O0 000 O0 0 5 1 1 4 68 0000000000 PIFINOPEX OHMI~ O0 000 O0 0 5 1 1 4 68 0000000000 RXOZ PEX OHI4~ O0 000 O0 0 5 1 1 4 68 0000000000 RX08 PEX OHF~I O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10280.500 RHOZ.PEX -999.250 HI)RA.PEX -999.250 PEFZ.PEX -999.250 DPHZ.PEX 60721.211 Pi~IN. PEX 0.128 HFiNO.PEX 0.046 RXOZ.PEX 0.030 RXOS.PEX 0.030 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PA GE: 17 **** FILE HEADER **** FILE NAFiE : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUM~ER: TOOL STRING NUf~3ER: PASS NUM~ER: DEPTMINC~: FILE SD?4MARY FILE HEADER FILE NUM~ER 6 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.0833 VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... PEX 10280.5 9150.0 AIT 10280.5 9150.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELEMETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 TOOL NUMBER TCC-B HILTB-DTB HRCC-B-849 6.000 9135.0 9135.0 LIS Tape Veri£~cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 18 MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHFiM) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 O. 199 57.0 O. 212 57.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): O. 5 REMARKS: ************ RUN 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORI~rfATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS FILE CONTAINS MAIN PASS RAW DATA SAMPLED AT 0.0833' $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 19 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 6 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 10280.500 HCAL.PEX 6.415 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFiBER 7 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 2O RUN NUM~ER: 1 TOOL STRING NUMBER: 1 PASS NUM~ER: 2 DEPTH INCREMENT: 0.5000 FILE SUFff~ARY VENDOR TOOL CODE START DEPTH PEX 9336.0 AIT 9336.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TI~IE CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 9150.0 9150.0 TOOL STRING (TOP TO BOTTOM) VFa%rDOR TOOL CODE TOOL TYPE TCC TELEMETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~) AT TEMPERATURE (DEGF): MUD AT M~ASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 TOOL NUMBER ........... TCC-B HILTB-DTB HRCC-B-849 6.000 9135.0 9135.0 (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 0.199 57.0 0.212 57.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:54 PAGE: 21 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 0.5 R~S: ************ RU/~ 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS IS THE RAW REPEAT DATA ACQUIRED AT O. 5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 7 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 7 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 7 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 7 1 1 4 68 0000000000 f4RES AIT OH~ O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 22 NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) MTEMAIT DEGF O0 000 O0 0 7 1 1 4 68 0000000000 GDEVAIT DEG O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 7 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 9336. 000 GR.AIT 32. 727 TENS.AIT 1295. 000 HTEN. AIT f4RES.AIT O. 066 MTE~.AIT 158. 253 GDEV. AIT -999. 250 CNTC. PEX CFTC. PEX 1988.763 RCFT. PEX 1988.763 RCNT. PEX 3420.587 TNRA.PEX RTNR.PEX 1.695 TNPH. PEX 17.132 NPHI.PEX 16.673 NPOR.PEX 920.177 3420.587 1.695 17.132 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 8 RAW OPEN HOLEREPEAT PASSES LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 23 Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INC~: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 9290.0 9150.0 AIT 9290.0 9150.0 $ LOG HEADER DATA DATE LOGGED: 30-NOV-97 SOFTWARE VERSION: 8B1 - 129 TIME CIRCULATION ENDED: 1200 29-NOV-97 TIFIE LOGGER ON BOTTOM: 1440 30-NOV-97 TD DRILLER (FT) : 10306.0 TD LOGGER (FT) : 10306.0 TOP LOG INTERVAL (FT): 9135.0 BOTTOM LOG INTERVAL (FT) : 10280.0 LOGGING SPEED (FPHR) : 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELEMETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OHMM) AT T~4PERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE T~MPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: TOOL NO?4~ER TCC-B HILTB -DTB HRCC-B-849 6.000 9135.0 9135.0 (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 0.209 57.0 O. 199 57.0 0.212 57.0 THERMAL SANDSTONE LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:~= PAGE: 24 MATRIX DENSITY: HOLE CORRECTION (IN) '. 2.65 TOOL STANDOFF (IN): O. 5 P~S: ************ RUi¥ 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS IS THE RAW REPEAT DATA ACQUIRED AT O. 25' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 8 1 1 4 68 0000000000 AFiO AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000 AF20 AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000 AF30 AIT OH~4~ O0 000 O0 0 8 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:b= PAGE: 25 NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) AF60 AIT OH~4 O0 000 O0 0 8 1 1 4 68 0000000000 AF90 AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000 ATiO AIT OP~f O0 000 O0 0 8 1 1 4 68 0000000000 AT20 AIT OH~M O0 000 O0 0 8 1 1 4 68 0000000000 AT30 AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000 AT60 AIT OP~4~ O0 000 O0 0 8 1 1 4 68 0000000000 AT90 AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 9336.000 AFIO.AIT 2.953 AF20.AIT 8.970 AF30.AIT AF60.AIT 70.176 AFgO.AIT 84.933 ATIO.AIT 2.955 AT20.AIT AT30.AIT 14.597 AT60.AIT 55.860 ATgO.AIT 73.694 22.001 9.015 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFiE : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUFi~ER 9 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUM~ER: 1 TOOL STRING NUM~ER: 1 PASS NUFiBER: 2 DEPTH INC~: 0.1667 LIS Tape Ver~cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:b~ PAGE: 26 FILE S~Y VENDOR TOOL CODE START DEPTH PEX 9290.0 AIT 9290.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIM~ CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 9150.0 9150.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELEFiETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHD~I) AT TEMPERATURE (DEGF): MUD AT f4EASURE29 TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 TOOL NUMBER TCC-B HILTB-DTB HRCC-B-849 6.000 9135.0 9135.0 (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 O. 199 57.0 0.212 57.0 THERMAL SANDSTONE 2.65 0.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 27 ~: ************ RUN 1 LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS IS THE RAW REPEAT DATA ACQUIRED AT 0.1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 $ 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~4E SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELM CODE (HEX) DEPT FT O0 000 O0 0 9 1 1 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 9 1 1 4 68 0000000000 ~{DRA PEX G/C3 O0 000 O0 0 9 1 1 4 68 0000000000 PEFZ PEX O0 000 O0 0 9 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 ~IN PEX OH~ O0 000 O0 0 9 1 1 4 68 0000000000 Ht4NO PEX OP~4~ O0 000 O0 0 9 1 1 4 68 0000000000 RXOZ PEX OH~E~ O0 000 O0 0 9 1 1 4 68 0000000000 RX08 PEX OH~M O0 000 O0 0 9 1 1 4 68 0000000000 LIS Tape Ver~=~cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 28 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) HCNT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 9 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 Rt{NT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 9336.000 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX DPHZ.PEX 60721.211 P~4IN. PEX 37.732 HMNO. PEX 16.373 RXOZ.PEX RXO8.PEX 5000.030 HCNT.PEX 3420.587 HCFT. PEX 1988.763 HGR.PEX RHFT. PEX 1988.763 R3{NT. PEX 3420.587 HTNP. PEX 17.132 HNPO.PEX -999.250 5000.033 32.727 17.132 ** END OF DATA ** **** FILE TRAILER **** FILE NAI~E : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE · 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAIVlE : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 10 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUFIBER: 1 PASS NUMBER: 2 LIS Tape Ver~cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 29 DEPTH INC~ : FILE S~Y O. 0833 VENDOR TOOL CODE START DEPTH PEX 9290.0 AIT 9290.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 9150.0 9150.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELE~IETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) '. DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (Oh?4~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MIID AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.O TOOL NUMBER TCC-B HILTB-DTB HRCC-B-849 6.000 9135.0 9135.0 (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 0.199 57.0 O. 212 57.0 THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 LIS Tape Verl==cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5= PAGE: 31 DEPT. 9336.000 HCAL.PEX 6.174 ** END OF DATA ** **** FILE TRAILER **** FILE NAFiE : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAIVE : EDIT .01I SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 11 RAW CASED HOLEMAIN PASS Curves and log header data for open hole logs run into casing. PASS AU3M~ER: 1 DEPTH INCREF~_JTT: 0.5000 FILE SUMM3~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 9150.0 8945.0 PBX LOG HEADER DATA DATE LOGGED: 30 -NOV- 97 SOFTWARE VERSION: 8B1-129 TIFiE CIRCULATION ENDED: 1200 29-NOV-97 TI~IE LOGGER ON BOTTOM: 1440 30-NOV-97 TD DRILLER (FT) : 10306.0 TD LOGGER (FT) : 10306.0 TOP LOG INTERVAL (FT) : 9135.0 BOTTOM LOG INTERVAL (FT) : 10280.0 LOGGING SPEED (FPHR) : 1800.0 TOOL STRING (TOP TO BOTTOM) LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 30 ~: ************ RUN 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CtrRRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS IS THE RAW REPEAT DATA ACQUIRED AT O. 0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 ? 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 10 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 i6:b~ PAGE: 32 VENDOR TOOL CODE TO°L TYPE TCC TELEMETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ TOOL NUMBER ........... TCC-B HILTB-DTB HRCC-B- 849 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 9135.0 9135.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OI-IM~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 0.199 57.0 0.212 57.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 0.5 R2~4ARKS: ************ RUN 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRElVT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS IS THE RAW PEX DATA ACQUIRED AT 0.5' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA LIS Tape Ver~=cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:b= PAGE: 33 ** DATA FORMAT SPECIFICATION RECORD ** ** SBT TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 11 1 1 4 68 0000000000 TENS AIT LB O0 000 00 0 11 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 11 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 11 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 RCNTPEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 11 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 11 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 1i 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 11 1 1 4 68 0000000000 TiVPH PEX PU O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 9150.000 TENS.AIT 1415.000 HTEN. AIT 828.061 GR.AIT CNTC. PEX 2070.123 CFTC. PEX 884.046 RCFT. PEX 914.955 RCNT. PEX TNRA.PEX 2.284 RTNR.PEX 2.418 NPOR.PEX 26.396 NPHI.PEX TNPH. PEX 24.540 48.405 1960.242 22.892 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 34 DEPT. 8945.000 TENS.AIT CNTC. PEX 1180.113 CFTC.PEX TNRA.PEX 4.184 RTNR.PEX TNPH. PEX 56.602 1011.000 HTEN. AIT 279.167 RCFT. PEX 4.184 NPOR.PEX 788. 726 GR.AIT 279. 166 RCNT. PEX 56.601 NPHI.PEX 83.309 1180.116 57.683 ** END OF DATA ** **** FILE TRAILER **** FILE NAFiE : EDIT .011 SERVICE · FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFi~ER 12 RAW CASED HOLEREPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 2 DEPTH INCREME2FT: 0.5000 FILE SUMFIARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 9150.0 8995.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TI~IE CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 LIS Tape Ver~=xcation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:~ PA GE: 35 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELEF~ETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT FIEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : TOOL NUMBER TCC - B HILTB -DTB HRCC-B-849 6. 000 9135.0 9135.0 (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 O. 209 57.0 O. 199 57.0 0.212 57.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): O. 5 RI~W-~DJ~S: ************ RUiq 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS IS THE RAW REPEAT PEX DATA ACQUIRED AT O. 5' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:~= PAGE: 36 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 12 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 12 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 12 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 12 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 12 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 12 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 ** DATA ** DEPT. 9150.000 TENS.AIT 1177.000 HTEN.AIT 843.449 GR.AIT CNTC.PEX 1681.149 CFTC. PEX 610.312 RCFT. PEX 919.239 RCNT. PEX TNRA.PEX 2.740 RTNR.PEX 2.466 NPOR.PEX 31.572 NPHI.PEX TNPH. PEX 30.777 51.911 2037.905 29.623 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:5~ PAGE: 37 DEPT. 8999.500 TENS.AIT CNTC. PEX 1126.001 CFTC.PEX TNRA.PEX 3.823 RTNR.PEX TNPH. PEX 46.576 1597.000 HTEN. AIT 299.723 RCFT. PEX 3.629 NPOR.PEX 809.319 GR.AIT 312.320 RCNT. PEX 45.294 NPHI.PEX 73.401 1144.069 48.353 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 13 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.1667 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 9150.0 8999.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 30-NOV-97 8B1-129 1200 29-NOV-97 1440 30-NOV-97 10306.0 10306.0 9135.0 10280.0 1800.0 LIS Tape Veri~xcation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:b= PAGE: 38 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TCC TELEMETRY CARTRIDGE PEX PLATFORM EXPRESS PEX PEX CARTRIDGE $ TOOL NUMBER TCC-B HILTB-DTB HRCC-B-849 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 9135.0 9135.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~9~) AT TEMPERATURE (DEGF): MUD AT MEAS~ TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): (WBM) QUIKDRIL N 8.70 49.0 8.3 181.0 0.209 57.0 0.199 57.0 0.212 57.0 ArEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): O. 5 R~S: ************ RUN 1 ************* LOGS RAN DRILLPIPE CONVEYED WITH SLIM TLC DUE TO 3.5" HWDP ID TIED INTO GR LOG FROM DS 5-04 (OLD BHC LOG) CURRENT DRILL FLOOR 10 FT ABOVE ORIGINAL D.F. DOWN LOG RECORDED (DENSITY INVALID DUE TO TOOL ORIENTATION) UP LOG WITH GOOD TOOL ORIENTATION. AITH RAN WITH "COMPUTE STANDOFF" FOR 4' RES LOGS THIS IS THE RAW REPEAT PEX DATA ACQUIRED AT 0.1667' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 PAGE: 39 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAFiE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) DEPT FT O0 000 O0 0 13 1 1 4 68 0000000000 HClVT PEX CPS O0 000 O0 0 13 i 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 13 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 RHNTPEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 13 1 1 4 68 0000000000 P~NPO PEX PU O0 000 O0 0 13 1 1 4 68 0000000000 ** DATA ** DEPT. 9150.000 HCNT. PEX 1680.925 HCFT. PEX 617.353 HGR.PEX RHFT.PEX 979.187 RHArT. PEX 1951.673 HTNP.PEX 30.287 HNPO. PEX DEPT. 8999.834 HCNT. PEX 1128.457 HCFT. PEX 299.353 HGR.PEX RHFT. PEX 313.890 RHAUf. P~ 1141.510 HTNP. PEX 47.767 HNPO. PEX 45.474 31.127 73.934 44.935 ** END OF DATA ** LIS Tape Ver~cation Listing Schlumberger Alaska Computing Center 30-DEC-1997 16:~. PAGE: 4O **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NA~IE : EDIT DATE : 97/12/30 ORIGIN : FLIC TAPE NAM~ : 97575 CONTINUATION # : 1 PREVIOUS TAPE : COMP~NT : ARCO ALASKA INC., D.S. 5-04A, PRUDHOE BAY, API #50-029-20152-01 **** REEL TRAILER **** SERVICE NAM~ : EDIT DATE : 97/12/30 ORIGIN : FLIC REEL NAME : 97575 CONTINUATION # : PREVIOUS REEL : COi~ENT : ARCO ALASKA INC., D.S. 5-04A, PRUDHOE BAY, API #50-029-20152-01