Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-047 e e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cQ Q If - 0 Y-!:j Well History File Identifier ~WO-Sided 11I11111I1111111111 Production Scanning Stage 1 Page Count from Scanned File: q q (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES ~ Date:&!1/Db Organizing (done) RES CAN DIGITAL DATA ~skettes, No. ~ D Other, NolType: D Color Items: D Greyscale Items: D Poor Quality Originals: D Other: NOTES: Date ~ I ~ I 00 Date fa I q /00 3 x30= qo Date /P fq / () (p BY: é Maria -; Project Proofing BY: € Maria "' Scanning Preparation BY: ( Maria J BY: Stage 1 If NO in stage 1, page(s) discrepancies were found: BY: Maria Date: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: Comments about this file: D Rescan Needed 1/111111/1111111111 OVERSIZED (Scannable) D Maps: D Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) D Logs of various kinds: o Other:: 151 mp + ~ 11I11111111I111111I mp = TOTAL PAGES qg (Count does not include cover sheet) II\A P 151 f r r 11111111/1111111111 151 NO YES IS/~ P NO 151 "'11111/11I1111111 11111111111/1/1111I 151 Quality Checked 111111111111 "1111I 10/6/2005 Well History File Cover Page.doc • =-.a»,.. F~~.:~ -. MICROFILMED 03/01/2008 DO NOT PLACE ,'= _ _. ;~ _~:: ~_ .,_ ,- ::~,, ANY NEW MATERIAL UNDER THIS PAGE F:~I.aserFiche\CvrPgs_InsertstMicrofilm_Marker.doc 11/14/06 11/17/06 Sclllumberger NO, 4040 Schlumberger·DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: Alaska Oil & Gas Cons Comm Atto: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Well Job# Log Description Date BL Color CD L-201L1 PB1 40010303 OH EDIT OF MWD/LWD 04109/04 2 1 L-201L3 PB1 40010303 OH EDIT OF MWD/LWD 04/25/04 2 1 V-210 40011161 OH EDIT OF MWD/I,WD 11/05/04 2 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc Petrotechnical Data Center LR2-1 900 E Benson Blvd Anchorage AK 99508-4254 (j!, Schlumberger-DCS 2525 Gambell St, Suite 400 ,-,_." OO~'''ïL ATTN: sethill .----~ Received by: . ~.!(l',..,f ,;~ ~) 'If',''flt' ~'~'1·· ¿:, "./ " tl Date Delivered ¿)tf-l-D'--l'i- ~ /Lf8fo"1 ~ 11/08/06 ScIduIIHPgep NO\! l 3 2006 NO. 4029 SChlumberger·DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Company: Alaska Oil & Gas Cons Comm Att": Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Well Job' log Description Date Bl Color CD Y-204l1 40010781 OH EDIT OF MWD/lWO 08114104 1 1 Y-204l1 PB1 40010781 OH EDIT OF MWDIlWD 08/14104 1 1 Y-204l2 40010781 OH EDIT OF MWOIlWD 08/22104 1 1 Y-204l2 PB1 40010781 OH EDIT OF MWD/lWD 08122104 1 1 Y-204PB2 40010781 OH EDIT OF MWD/lWD 08109/04 1 1 Y -204l3 40010781 OH EDIT OF MWD/lWO 08128104 1 1 l-201 40010303 OH EDIT OF MWDIlWO 04/03/04 2 1 l·201 PB1 40010303 OH EDIT OF MWD/lWD 03130/04 2 1 l-201 PB2 40010303 OH EDIT OF MWD/lWD 04101/04 2 1 l-201l1 40010303 OH EDIT OF MWDIlWD 04/09/04 2 1 l-201l2 40010303 OH EDIT OF MWD/lWD 04119/04 2 1 l-201l3 40010303 OH EDIT OF MWD/lWD 04126/04 2 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc Petrotechnical Data Center LR2~1 900 E Benson Blvd. Anchorage AK 99508-4254 Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 A TTN: Belh .'__ Date Delivered Received by' . ee, ( 8tf1-D~/'::J it '<-I d33 } ~ ~ ~--'. DATA SUBMITTAL COMPLIANCE REPORT 4/24/2006 Permit to Drill 2040470 Well Name/No. PRUDHOE BAY UN ORIN L-201 L 1 Operator BP EXPLORATION (ALASKA) INC JI't¿,¿ "Ilp.? d' r- API No. 50-029-23202-60-00 MD 13540 ,., TVD 4665 ".- Completion Date 4/30/2004"'- Completion Status 1-01L Current Status 1-01L UIC N --..-..-.-- ~-'"~_._-------- --_._~------ ,---.-.. --_..-~-,----_...----_._,------- - - _._,- ----.-- --_.-._-_._~-_._------~--~-----,-~-- --.----.---------- -, --- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes __ __ _,__ ____M_-'_._______________,________________,_,_, _,,____ -------~_._-,,_._-----.._--- - ------. - -,-_._-,----- ,---,- ,.,--- --- --- --,-, -.- ----------~---- ------,------ ---..-,---_._--,---.,_.---_._-_._------------~-----------,- ~,--_._-,,----------- ----------_..,-_._------~------_.._~----~--,-,--- -.---.--..------,-, -.-. ---- -- DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / Asimuthal DEN / NEW / AIM / PWD Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ___. _.__,______,__.__.______"______,,__~________________~____.4'______________ ED D Asc Directional Survey Rpt Directional Survey (data taken from Logs Portion of Master Well Data Maint ( Log Log Run Scale Media No Interval Start Stop OH/ CH Received Comments 5/5/2004 5/5/2004 ---_._--------~---- - ----,._"._--"'--_._-------,-----.."-,---_..~------,.~---_._~-----_._--------,---- _._--------------"-~--_._.._--,,--_._._-~ ~.___,_____~___ h__.~__,_,..__ _._____,_____~_~ ._,_________ Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments ADDITIONAL INFORMATION Well Cored? Y G) Chips Received? -Y / ~~ Daily History Received? ~ f)/N Formation Tops Analysis Received? ~ ( ---------_.-----,---,----_.,-------------,.._--.---------~ ._,._-,~--,-----_._---------_.._---------,.._--_._._--~---_._"._,--,_.,_._---~------ -------~---~---~-,._----~--------- -----~"._--~---,-,--- -.--,..--_..~---,-_.,,"-_.. Comments: , r --.. ...:::::".:...:::.::.:::.:...:.:::::::::::::::::::::::::::::=::=--::::::.::::::=:==::::::::::..-----::::-:.:--.:~ =:::-0:=:::::=-==::::.:::::::::::::=::=---:::::::':.:::=:=::::::::::::-====::::::==::=:=-----.:.-:::::.:::.=:::::::::----.-. -----.-..-....----------..-- Compliance Reviewed By: _.____ Date: ----~1fjr::.--..--·---·--------·-·-·---:: -dr+_j/l\~ fa .Snbjçct: Missing Data From: Howard Okland <howard_ok~j@admin.state.ak.us> Date: Thu, 25 May 2006 14:33:47 -0800 To: ADdrew.Farmer@bp.com Andy, Open hole log data is missing for the following wells: PBU Orion L-201 50-029-23202-00 PBU Orion L-201 L 1 50-029-23202-60 PBU Orion L-201 L2 50-029-23202-61 PBU Orion L-201 L3 50-029-23202-62 Please submit to the Commission as soon as possible; Open Hole digital log data ( LIS, DLlS, or LAS) Open Hole Blue line logs Open Hole reproducables - sepia/mylar or digital graphics files (.pds or .pdf or .emf) TNX for your help. Howard ~n~" f'1 ....1~f. f1" ."r*~~.~' .... ..··8 p.' ..,~. '. -I' ¡'. ','.., :'/"¿;I" ':)~; ~·:~":f·l"· ~:'. .,:¡ ~ I \_ f . .. í .. . r ' , . " ! : \~;:;':.;".' '-';:,' ; www.PetroleumNews.com . NORTH SLOPE :)O:--F'+7 /0 3/ lot PETROLEUM NEvVS 9 PBu L-J-o LI BP cOInpletes quad-lateral at Orion Drilling end of viscous equation appears solved; production of heavy oil still an issue because of sand produced \J\lith oil and lvell rnaintenance issues By KRISTEN NELSON PeLroleum News EdiLor-in-Chie! The viscous oil resource on Alaska's NOlih Slope - like the natural gas resource there - has been known fOl~ decades, but heavy oil has been as stranded as gas, stranded in the ground through lack of the technology and knowledge neces- sary to produce it. Bf> Exploration (Alaska) has been working on ways to produce viscous oil, also referred to as heavy oil, at Milne Point since the 1990s and now also has viscous oil under dcvclop- . ment in the western Prudhoe I j /2 fi\~jW satellites. ' ..'- " Multi-lateral horizont.al S E R I E S wells have solved the drilling side or the viscous equation, but problems remain on the production side, members .of BP Exploration (Alaska)'s drilling team told Petroleum News in late September. Viscous oil accumulations lie closer to the SUrf~ICC and are colder, less mobile and have poorer reselVoir quality than conventional crude oil, said Mik Triolo, Greater Prudhoe Bay operations drilling engineer. Triolo worked the Schrader ßlufTviseous accumu- lation at Milne Point before moving over to Orion, working on the early multi-lateral and horizontal well designs in late 1999, early 2000. "And we've progres- sively evolved that technology ever since," he said. That work is continuing at Orion, a Pmdhoe Bay westel11 satellite viscous oil accumulation. Multi-lat- eral wells, well bores with multiple horizontal laterals into shallow sands containing viscous oil, make wells productive enough to be economic. First tri-Iateral in 2003 In 2003, BP drilled the first tri-Iateral multi-lateral well on the slope, and this year, the company set a world record with a quad-lateral well. "Horizontal multi-lateral wells have been the key to unlocking those (viscous) reselVes... predominate- ly through efficient geo-steering within the segregated sands... Rather than undulating through them," Triolo About the series Editor s Note: lv/embers of BP Axploration (Alaska) s drilling group sat down with Petroleum News Sept. 28 to talk about the company.s development drilling program, recent drilling records and about the technology that is driving the company s North Slope development drilling. Part 1 of this StOfY, printed in the Oct. 10 issue of Petroleum News, included all overview of the compallY S North Slope drilling activity and an update on its coiled tubing drilling pro- gram. Part 2,uwhich appeared in the Oct. 24 issue, described multi-lateral drilling at Milne Point, and well maintenance work. said, "we actually stick dedicated laterals into each one of the sand intervals." In addition to better ability to steer through the foonations, drilling also helps vis- cous oil development with "good well design," he said. A cmcial part of the well is where the laterals branch fi'om the main well bore, and BP has also been trying different junction designs, the connection between the main well bore and the lateral. At Milne Point BP detennined "that the level three, the TAML level three junction, was the junction of choice.. .," Triolo said. TAML stands for Technical Advancement of Multilaterals, an organization set up to regulate "the different levels of multilateral junction equipment such that everything is standardized," he said. "So if Baker comes out with a level-three junc- tion, the criteria that are set up to distinguish between a level-three and a level-four, are the same as for Halliburton. . ." The TAML levels, said Mark Johnson, BP senior coiled tubing drilling engineer, "refer to the re-entry capability of the junction and how well it seals or iso- lates at that junction." Re-entry capability and the seal see DP page 10 10 ,~e continued from page 9 BP -;;f: ~ 4: ~ Z o . provided are the two primary things a junc- ~ tion does, he said. ~ Triolo said BP detemlined "that we did ~ not need isolation at the junction - what we ~ needed was access to the lateral, so the level- ~ three junctions became the method of ~ :::I choice." 8 First level-three, quad-lateral weD in world BP took its experience at Milne Point to Orion, a western Prudhoe Bay satellite, and this year "we drilled the first level~three quad-lateral multi-lateral well in the world," Triolo said. (The accompanying graphic illustrates such a quad-lateral multi-lateral well.) BP's initial experience with multi-lateral wells was that complicated wells were . I expenSive for the wells group to maintain: "We didn't really have cost-effective ways to work on the wells or impact the flow streams of the wells later in life, so we went baek to the drawing board and came up with some criteria that we wanted to see achieved in our well dcsigns, and then worked with our ~endors to come up with a solution to those problems." The current system, he said, was "proved up in Milne Point" and the junction design was modified at Orion "to add more dlì- ciency to the full life-cycle cost of the well," Triolo said. Wcll work can now be done through the tubing, with a coiled tubing unit, without the need for a workover rig. The to1.11 footage in the quad-lateral well, Prudhoe Bay unit L-20 l, was almost 35,000 feet, with "almost 28,000 feet of horizontal footage within these thin bedded sands," more than five miles of horizontal footage in onc wcll, Triolo said. There wcrc cleanup issues with the well, and BP didn't realize fulll10w potclltial, but the well had a productivity index of 40 (a measure of barrels per pound of square inch drawdown), compared to 1110st wells on the slopc somewhcrc in thc 20-rangc. "lfwc could havc opencd it up full bore, we probably would have bccn somewhat tubing limited," he said. Facility limited Right now thc well is facility limited, Triolo said. Darcn ßeaudo, UP's dircctor of public affairs, said one of the things SP worked on during the summer production G~M~.I;t,. VISCOUS OIL QUAD ML COMPLETION 1fî' . :.if U ~ ,& III ~ 14 .. .... . ~Lf - 0 lJ'7 PETROLEUM NEWS · WEEK OF OaOBER 31. 2004 '- ..,~: :'-;j~E$~;;¡:~~~~~~1i£,",,}.¡j;~*~~~ shutdown at Prudhoe Bay was cleaning sand out of tanks in Gathering Center 2. "One of the constraints that we've had is managing all of this sand," he said. "This is a viscous oil production issue, not a well-rate issue," Beaudo said, and the issue is the sand produced with the viscous oil. To really produce viscous to the maxi- mum, BP will either have to add facilities to handle sand that comes to the surface or find a way, such as screens, to keep the sand in thc reselvoir. Not only does sand accumulate in pro- duction facilitics, said Andy Kirk, BP's Alaska drilling and wells perfOlmance con- sultant, but it also causes problems in pipelines because it is corrosive - another reason to keep it in the foonation. And i r a Illulti-Iateral well has to be shut in and thc oil stops flowing, Kirk said, the santi can layout along UIC horizontal portion oCthe well, creating dunes which plug up the well, making it difficult to re-establish pro- duction when the well is brought back online. Opportunity huge The opp0l1unity for viscous' is huge: - ~- w 7~~~·~~~,\;;~~!_.~~~~~ some 1.6 billion barrels recoverable with current technology, said Gary Christman, BP's Alaska dri1ling and wells manager. "We're going through kind of a concept selection phase ... and one of the things that we don't know is how we're going to handle all this production, because it is dif- ferent. " "This multi-lateral technology has unlocked the flow potential," said Johnson. "now we can finally get that reservoir to now at economic rates - and that's been the challenge for the last 20 years. ...~' There are other issues now connected with gctting viscous production to the sur- /àce, "but the key thing is that this multi- lateral has unlocked viscous oil." Christman said the horizontal footage drilled in the quad-lateral well, the 25,000- fect of horizontal hole, has "not been done anywhere else in the world: it's just huge, just huge stuff" The issues, now, Christman' said, are sand control and long-term scrviceability of the multi-lateral wclls: "The multi laterals are there, but do we know we can keep them all producing for many, many years? "It will be a sand control issue... And "Horizontal multi-lateral wells Itave been tlte hey to unloching those (viscous) reserves... predominately through efficient geo-steering within the segregated sands... Rather than undulating througJ~the1n, we actually Stiell dedicated ld.!erals into each one of the sand intervals." - Mik Triolo, BP Exploration (Alaska) drilling engineer long-tenn well serviceability," he said. Well design evolved here The men said this is a slope-wide effort, with a slope-wide viscous team including BP, ConocoPhillips and ExxonIvlobil, working the viscous development issue, and contractors for the flnns developing the technology being used. Triolo said that while the well design in use at Orion was evolved at BP, "we've also shared this well design with ConocoPhiUips and so they're using it on their development," and ConocoPhillips is "learning things over there that they're sharing with us," as part ofthe regional vis- cous team. ConocoPhillips operates the Kuparuk River unit viscous West Sak development effort. The quad multi-lateral has been drilled, and a quintuple multi-lateral is planned for later this year, Triolo said, the first such well on the slope. That well, however, is not planned with five junctions coming out from the main well bore, because "somc of these sands are so thin that they cannot eco- nomically support the cost of a multi-later- al junction," so coiled tubing technology will be used to do an open-hole junction. Four laterals will come off the main well bore; one o[those laterals will split again. The whole well will be drilled with a rotalY rig, Triolo said, but will use some coiled-tubing dcvelopcd technology, scaled up in size to rotary applications. Some of that technology was developed for use over at Kuparuk, he said, so there is technology sharing among the dilTerent drilling groups, as well as betwccn BP and ConocoPhillips. Drilling, services and materials contrac- tors responsible for technology for BP's drilling program include: Baker Hughes lnteq; Doyon Drilling; Halliburton; Nabors Drilling; Nordic Calista Drilling; Schlumberger; and WellTec Tractor. . .... ') STATE OF ALASKA ') ALASKA uiL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD / GR / RES / Azimuthal DEN / NEU / AIM / PWD CASING, LINER AND CEMENTING RECORD ":I~G;t!;I~ß::Pl;erH,li~w~,:,':':'i$~TiT'N~,I!~!;~:J'H¡~R!lil :,i'i,i'i)l'l,iÔPi:'I'I:llli !'B():r~ÔfV1 !I: 111:'IIIII¡,IO~;:I:::¡,:lil, ,Bp;rmOMi':11 Surface 108' Surface 108' 29' 3197' 29' 2642' 27' 6372' 27' 4560' 6367' 13506' 4559' 4665' 6173' 6346' 4493' 4553' o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. i 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 5136' NSL, 1050' WEL, SEC. 34, T12N, R11E, UM (OBb) Total Depth: 1440' NSL, 4549' EWL, SEC. 35, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583325 y- 5978321 Zone- ASP4 TPI: x- 585830 y- 5980888 Zone- ASP4 Total Depth: x- 591477 y- 5977258 Zone- ASP4 18. Directional Survey !HI Yes 0 No 22. 20" x 34" 10-3/4" 7-5/8" 4-1/2" 4-1/2" 215.5# 45.5# 29.7# 12.6# 12.6# A53 L-80 L-80 L-80 L-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6434' - 13465' 4573' - 4664' One Other 5. Date Comp., Susp., or Aband. 4/30/2004 6. Date Spudded 4/6/2004 7. Date T.D. Reached 4/9/2004 8. KB Elevation (ft): 78.7' 9. Plug Back Depth (MD+TVD) 13540 + 4665 10. Total Depth (MD+ TVD) 13540 + 4665 11. Depth where SSSV set (Nipple) 2266' MD 19. Water depth, if offshore N/A MSL Revis~d~ 101128/04, Put, on.Production· '," 1 b. Well Class: !HI Development 0 Exploratory o Stratigraphic 0 Service 12. Permit to Drill Number 204-047 13. API Number 50- 029-23202-60-00 14. Well Name and Number: PBU L-201 L 1 15. Field / Pool(s): Prudhoe Bay Field / Orion Ft Ft 16. Property Designation: ADL ADL 028238 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) "II~MQ~" ~ililli II:,",II"I,¡";:'"I"''''.I,~I'''I':,''''I 1!:,!It::;:1UL: "1:;0,"(, 260 sx Arctic Set (Approx.) 630 sx AS Lite, 355 sx Class 'G' 613 sx Class 'G' Uncemented Slotted Liner Uncemented Tieback Liner 1241; PACKER SET (MD) 5873' Form 10-407 Revised 12/2003 (Lnlr,t\IÔ' CONTINU~_P~~V~RSE\ SidE.' ." f 48" 13-1/2" 9-7/8" 6-3/4" N/A SIZE 4-1/2", 12.6#, L-80 DEPTH SET (MD) 6000' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 150 Bbls of Diesel GAs-McF 51 W A TER-BBl 21 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): June 28, 2004 Gas Lift Date of Test Hours Tested PRODUCTION FOR Oll-BBl 7/9/2004 2 TEST PERIOD + 203 Flow Tubing Casing Pressure CALCULATED + Oll-Bsl Press. 70C 1,300 24-HoUR RATE 2,432 GAs-McF 607 WATER-BBl 249 CHOKE SIZE GAS-Oil RATIO 75 249 Oil GRAVITY-API (CORR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None ~Bfl rol' a ~ ?r-r: h ~~ '~'728. ) ) GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff eBb 6733' 4573' None Schrader Bluff eBb 8325' Schrader Bluff eBb 8877' 4569' 4578' 4590' Schrader Bluff OBa 11400' Schrader Bluff eBb 11905' 4623' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble /fá JlÆt..!). ~ 1 ~ Title Technical Assistant Date 07· ~ -O<{ PBU L-201 L 1 204-047 Prepared By Name/Number: Terrie Hubble, 564~4628 Well Number Drilling Engineer: Michae/ Triolo, 564-5774 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ,It J'ì STATE OF ALASKA ) ALASKA 'IL AND GAS CONSERVATION COMrvll~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,.. ". . 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD I GR I RES I Azimuthal DEN I NEU I AIM I PWD CASING, liNER AND CEMENTING RECORD $E17Ir~G Ð~PJHI Mb I SEEING PEP17HrND:::,':~AAbL6'¡':':',¡' \ TiO?, I, 'BQ¡Y;:¡;OM I' ,'1, , :TOR ,," BOJITON1i:I.::':'S,IZE;;'il'.":: Surface 1 08' Surface 1 08' 48" 29' 3197' 29' 2642' 13-1/2" 27' 6372' 27' 4560' 9-7/8" 6367' 13506' 4559' 4665' 6-3/4" 6173' 6346' 4493' 4553' N/A o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 5136' NSL, 1050'WEL, SEC. 34, T12N, R11E, UM (OBb) Total Depth: 1440' NSL, 4549' EWL, SEC. 35, T12N, R11 E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583325 y- 5978321_ Zone- ASP4 TPI: x- 585830 y- 5980888 Zone- ASP4 Total Depth: x- 591477 y- 5977258 Zone- ASP4 18. Directional Survey 181 Yes 0 No 22. 'CASING ." ,:,$I;?E'/:' 20" x 34" 10-3/4" 7-5/8" 4-1/2" 4-1/2" I " I : I: I -: I ' ',':;,', I ;, Ii', I:' " " : 'I ',I, ~ I I "NT;' PER, F'T ;1';, 215.5# 45.5# 29.7# 12.6# 12.6# II' ",11\'1"'1:"1,.;;,::11'::,;1: :GMPE: A53 L-80 L-80 L-80 L-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6434' - 13465' 4573' - 4664' 26. Date First Production: Not on Production Yet Date of Test Hours Tested One Other 5. Date Comp., Susp., or Aband. 4/30/2004 6. Date Spudded 4/612004 7. Date T.D. Reached 4/9/2004 8. KB Elevation (ft): 78.7' 9. Plug Back Depth (MD+ TVD) 13540 + 4665 10. Total Depth (MD+TVD) 13540 + 4665 11. Depth where SSSV set (Nipple) 2266' MD 19. Water depth, if offshore NIA MSL 1b. Well Class: 181 Development 0 Exploratory o Stratigraphic Test 0 Service 12. Permit to Drill Number 204-047 13. API Number 50- 029-23202-60-00 14. Well Name and Number: PBU L-201 L 1 15. Field I Pool(s): Prudhoe Bay Field I Orion Ft Ft 16. Property Designation: ADL ADL 028238 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) . I"~MOQ~~:',, .',:: f?UGtEÓ: I:' 260 sx Arctic Set (Approx.) 630 sx AS Lite, 355 sx Class 'G' 613 sx Class 'G' Uncemented Slotted Liner Uncemented Tieback Liner 24.' ·1"TÜåïNG'RecORD"··.··" ..... " SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 6000' PACKER SET (MD) 5873' 25'.. ,.... Åçrp'~RACTþRE, CE~EtN' '~QUE~E ET9:. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 150 Bbls of Diesel PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL -BBL CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (att~eW3~t2\m~et, if necessary). SUbm.. i..t...core chips; if none, state "none". ~ . . .\1 .. .' ;".--- .... ..- .. ß\ 8 LUI!Jìf . ç ~., ~ r ~ ~ Comnl15SIon None ,.' '.. ØIfS. nC! JY\1'I \VI A\ ~K~ n;I,,, iJ J.', ,-,O\i."'. . ~. !'. :,:' '. .' . 'g'lI ~ 3:::;,'· u., '.' .' ~".... ."r'" : t..) ~:.:~ ',' I~¡Y' ;.,¡¡\ ,:::..1'=' ¡ //I:-~\:~- ~.' . .-",. :_,~~:;::,~J: Form 10-407 Revised 12/2003 PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + OIL-BBL Press. 24-HoUR RATE 27. GAs-McF WATER-BBL GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO OIL GRAVITY-API (CORR) RCCEi\lEi() CONTINUED ON REVERSE SIDE ORIG:NAL ,. r" . _~ t" , 28. ') 29. 1 FORMATION TESTS GEOLOGIC MARKERS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff CBb 6733' 4573' None Schrader Bluff OBb 8325' 4569' Schrader Bluff OBb 8877' 4578' Schrader Bluff OBa 11400' 4590' Schrader Bluff OBb 11905' 4623' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed TerrieHubble /~.J ~l~ Title Technical Assistant Date O&'-'O~-Olf PBU L-201 L 1 204-047 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Michael Triolo, 564-5774 Permit No.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 . - - - . - -. - . . . - __ _. n._ .. __ .. BPE)(fåLCRATIÓN· Leak-Off Test Summary . . J.::.:~.. ·i, Pagê'1uof 1 Legal Name: L-201 Common Name: L-201 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off pressure"'(BHP) , EMW 3/21/2004 LOT 3,197.0 (ft) 2,642.0 (ft) 9.20 (ppg) 575 (psi) 1,838 (psi) 13.39 (ppg) 3/27/2004 FIT 7,047.0 (ft) 4,673.0 (ft) 9.20 (ppg) 680 (psi) 2,913 (psi) 12.00 (ppg) 4/5/2004 FIT 6,372.0 (ft) 4,562.0 (ft) 9.20 (ppg) 665 (psi) 2,845 (psi) 12.01 (ppg) 4/14/2004 FIT 6,229.0 (ft) 4,514.0 (ft) 9.20 (ppg) 660 (psi) 2,817 (psi) 12.01 (ppg) --../ 4/23/2004 FIT 6,025.0 (ft) 4,440.0 (ft) 9.30 (ppg) 646 (psi) 2,791 (psi) 12.10 (ppg) ---- Pri,.,'p.r1- 513'2004 8·4~·51 A~ft ~ . ) ,) .., ., . BP EXPLORATION .". r . Óperå'tiøn.$·'sµmmary. Report. . Page 1 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 . D~te. From - To Hours Task Gode NPT Phase Description of Op~rations 3/16/2004 12:00 - 14:00 2.00 MOB P PRE Blow down steam and water lines. Rig down for move. Lay rig mats on L-201 14:00 - 15:00 1.00 MOB P PRE Move camps and pits. 15:00 - 16:00 1.00 MOB P PRE Move rig off of L-211 and position on L-201 RIG ACCEPTED @ 16:00 hrs 16:00 - 19:30 3.50 RIGU P PRE NU diverter, riser and Hydril. 19:30 - 21 :30 2.00 RIGU P PRE Level rig and pits 21 :30 - 00:00 2.50 RIGU P PRE RU pits. Position Swaco unit and cuttings tank. 3/17/2004 00:00 - 01 :00 1.00 RIGU P PRE Load BHA #1 in pipe shed. Continue NU diverter, riser and Hydril. 01 :00 - 04:30 3.50 RIGU P PRE Take on water and build spud mud. Change out riser 04:30 - 06:00 1.50 RIGU P PRE Change out top drive quill for 5" DP 06:00 - 07:00 1.00 RIGU P PRE PU Jewelry for BHA #1 07:00 - 10:30 3.50 RIGU P PRE MU 35 stands of 5" DP and stand back in derrick 10:30 - 12:00 1.50 RIGU P PRE MU HWDP and Collars, stand back in derrick. 12:00 - 17:30 5.50 RIGU P PRE Move 105 joints of 5" DP into pipe shed. MU 35 stands, stand back in derrick. 17:30 - 18:30 1.00 RIGU P PRE MU BHA #1 18:30 - 19:00 0.50 BOPSUF P PRE Function test diverter. Witness of diverter test waived by John Crisp with AOGCC. 19:00 - 19:30 0.50 RIGU P PRE Pre-spud meeting with Anadrill, MI, Sperry, Gyro Data and all rig personnel. 19:30 - 20:00 0.50 RIGU P PRE RU Sperry WL unit and GyroData for gyro surveys. 20:00 - 21 :00 1.00 RIGU P PRE Finish MU BHA #1. Orient motor and MWD 21 :00 - 21 :30 0.50 DRILL P SURF RIH and tag up at 108'. Fill stack. Circulate mud system checking for leaks. 21 :30 - 00:00 2.50 DRILL P SURF Drill 13-1/2" surface hole from 108' to 170'. RPM = 50 Torque = 1.7k FtLb GPM = 600 @ 500 psi P/U 55k S/O 51 k ROT 53k Run gyro survey every stand drilled. ART = 0.25 hrs SPUD @ 21 :30 3/18/2004 00:00 - 02:30 2.50 DRILL P SURF Drill 13-1/2" surface hole from 170' to 447'. Sliding 100% to build angle WOB = 2-20 klbs GPM = 600 - 1006 psi on Btm, 765 psi off Btm P/U 69k 8/0 64k Run gyro surveys at 170', 196' and 447' 02:30 - 03:30 1.00 DRILL P SURF Stand back 3 stands to PU Jar stand. RIH to 447' 03:30 - 14:00 10.50 DRILL P SURF Drill 13-1/2" surface hole from 447' to 1570'. Sliding as required to build angle and maintain azimuth. WOB = 30-35klbs RPM = 80 Printed: 51312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L - 201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date, From- To HO~Jrs Task Code NPT Phase .. [)~sqripti().n <?fqper9-~i()ns. 3/18/2004 03:30 - 14:00 10.50 DRILL P SURF Torque off Btm = 2.3k FtLb, Torque on Btm = 7-9k FtLb GPM = 750 @ 2050 psi on Btm, 1570 psi off Btm P/U 87k S/O 80k ROT 82k 14:00 - 14:30 0.50 DRILL P SURF Circulate BU volume X 2 14:30 - 16:30 2.00 DRILL P SURF Monitor well - static. POH for new bit. started pulling over at 1100'. pumped out to 950'. Stand back BHA and drop off UBHO sub. 16:30 - 17:00 0.50 DRILL P SURF PU new HTC 13-1/2" MX-C1. Clean rig floor. 17:00 - 18:30 1.50 DRILL P SURF RIH to 1478'. MU top drive and wash last stand to bottom at 1570'. 18:30 - 00:00 5.50 DRILL P SURF Drill 13-1/2" surface hole from 1570' to 2360'. Sliding as required to build angle and maintain azimuth. WOB = 30-35klbs RPM = 80 Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb GPM = 750 @ 2200 psi on Btm, 1820 psi off Btm P /U 100k S/O 84k ROT 90k P/U 104k S/O 89k No Pumps Backream each stand at drilling rate. Intermittent gas hydrates from 1900' to 2360' AST = 8.66 hrs. ART = 3.49 hrs. Formation tops: SV4 - 1829' MD Base of Permafrost - 1892' MD SV3 - 2306' MD SV2 - 2547' MD 3/19/2004 00:00 - 04:00 4.00 DRILL P SURF Drill 13-1/2" surface hole from 2360' to 3210'. Sliding as required to build angle and maintain azimuth. WOB = 35klbs RPM = 80 Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb GPM = 750 @ 2200 psi on Btm, 1990 psi off Btm P/U 114k S/O 88k ROT 100k Backream each stand at drilling rate. Intermittent gas hydrates. AST = 1 .95 hrs. ART = 0.84 hrs Top of the SV1 @ 3050' MD 04:00 - 05:00 1.00 DRILL P SURF Circulate BU volume X 2.770 gpm @ 2060 psi, reciprocate DP at 100 rpm. 05:00 - 08:00 3.00 DRILL P SURF Monitor well- static. POH on short trip to HWDP. Overpulls to 25 klbs at 2050', 1850-1800', 1450'. Work each spot & clean Printed: 5/312004 8:46:01 AM ¡.. . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES From - To Hours Task Code NPT Phase 3/19/2004 05:00 - 08:00 3.00 DRILL P SURF 08:00 - 09:30 1.50 DRILL P SURF 09:30 - 12:00 2.50 DRILL P SURF 12:00 - 14:30 2.50 DRILL P SURF 14:30 - 15:30 1.00 DRILL P SURF 15:30 - 16:30 1.00 DRILL P SURF 16:30 - 17:00 0.50 DRILL P SURF 17:00 - 17:30 0.50 CASE P SURF 17:30 - 19:30 2.00 CASE P SURF 19:30 - 20:00 0.50 CASE P SURF 20:00 ~ 00:00 4.00 CASE P SURF 3/20/2004 00:00 - 01 :00 1.00 CASE P SURF 01 :00 - 01 :30 0.50 CASE P SURF 01 :30 - 02:00 0.50 CEMT P SURF 02:00 - 04:00 2.00 CEMT P SURF 04:00 - 04:30 0.50 CEMT P SURF 04:30 - 05:20 0.83 CEMT P SURF 05:20 - 05:40 0.33 CEMT P SURF 05:40 - 06:40 1.00 CEMT P SURF 06:40 - 07:00 0.33 CEMT P SURF 07:00 - 07:30 0.50 CEMT P SURF Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 D~scriptionof Operations up - OK. Tight spot at 1400' - swabbing. Kelly up & circ @ 300 gpm/350 psi. Work up thru tight spot and precautionary circ up to 900' w/ minor pulls. Continue POH to HWDP. RIH to bottom. Wipe minor tight spots at 1090' and 1300'-1500'. Circ last stand to bottom and cond mud for casing & cement - stage up to 770 gpm @ 2320 psi and 120 rpm. Reduce MW to 9.6 ppg & FV to 225. Monitor well - static. POH to run csg. Tight spot at 2032' - swabbing. MU top drive and circ @ 300 gpm/325 psi. Pump out to 2140'. POH to 1325', tight spot - swabbing. Work thru. POH with no more problems to HWDP. Monitor well at HWDP - static. Stand back HWDP, Jars and DC's LD BHA #2 Clean and clear rig floor. MU landing joint and make dummy run. RU csg equipment PJSM with MI, Nabors Casing and all rig personnel on running 10-3/4" surface casing. MU shoe track and test float equipment. Run 76 jts 10-3/4", 45.5#, L-80, BTC surface casing. Taking weight at 1100' work through to 1200'. Break circulation on jt #40. Taking weight again from 1920' to 2500' then clear to bottom. 25 bow spring centralizers on the collars of jts #1 and #3 thru #26 Midnight depth - 2582' Continue running 10-3/4·, 45.5# surface casing. MU landing joint and land casing with shoe at 3197'. RD fill-up tool and blow down top drive. RU cement head. Circulate and condition hole for cement. Stage pumps to 10 bpm @ 760 psi. Reciprocate csg 5-10', PIU 152k Ibs S/O 96k Ibs. No losses. PJSM with DS, NAD, MI, Veco, BP prior to starting cement job. Air up & prime up cementers. Mix & pump 5 bbls CW 100 preflush. Test lines to 3500 psi. Pump remaining 15 bbls CW100. Mix & pump 70 bbls Mudpush II spacer at 10.2 ppg. Release bottom plug. Mix & pump 480 bbls (605 sx) ArcticSet Lite slurry at 10.7 ppg - 8.5 bpm @ 390 psi. Switch to tail. Mix & pump 74 bbls (355 sx) Class G slurry at 15.8 ppg - 5 bpm @ 350 psi. Release top plug and kick out with 10 bbls water from cementers to clear lines. Switch to rig pumps and displace with mud at 12 bpm @ 800 psi. Getting good cement retums to surface 2000 strokes into displacement. Reciprocated pipe while pumping cement and 205 bbls into displacement - then landed on ring for remainder of job. Slow to 3 bpm for last 15 bbls displacement. Bump plug with Printed: 51312004 8:46:01 AM Page 4 of 34 BP EXPLORATION ...', ,.,,,,,., .,... .....".... . . . " ' . . , ,,()p~ratiºns SUIllI1JªryReport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L -201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date From-To H()ÜtsTa:~k Code N PT Phase 3/20/2004 07:00 - 07:30 0.50 CEMT P SURF 07:30 - 08:00 0.50 CEMT P SURF 08:00 - 14:00 6.00 DIVRTR P SURF 14:00 - 20:30 6.50 BOPSUF P SURF 20:30 - 21 :00 0.50 BOPSUR P SURF 21 :00 - 00:00 3.00 BOPSUF P SURF 3/21/2004 00:00 - 00:30 0.50 BOPSUF P SURF 00:30 - 01 :00 0.50 BOPSUP P SURF 01 :00 - 03:30 2.50 DRILL P INT1 03:30 - 05:00 1.50 DRILL P INT1 05:00 - 06:00 1.00 CASE P SURF 06:00 - 07:30 1.50 DRILL P INT1 07:30 - 09:00 1.50 DRILL P INT1 09:00 - 10:00 1.00 DRILL P INT1 10:00 - 11 :00 1.00 DRILL P INT1 11 :00 - 12:30 1.50 DRILL P INT1 12:30 - 13:00 0.50 DRILL N FLUD INT1 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 DeSCfiptioO·.qf··{)peré3.tions 1500 psi at 299.6 bbls total displacement. Bleed off pressure - floats holding. Full returns throughout pumping and displacing cement. Got back 125 bbls good lead slurry. CIP at 07:30 hrs on 3/20/04. Flush flow line and stack. Blow down and RD cement lines. RD cement head. Break out and LD landing joint. ND diverter, riser and Hydril. Move diverter line out of cellar. NU speed head, tbg spool and BOP. 15:30 hrs - take on new 9.2# LSND mud PJSM with all rig personnel on testing BOPE Test BOPE to 250/3500 psi. Test annular to 250/3500 psi. Witness of BOP test waived by Jeff Jones with AOGCC. Continue testing BOPE 250/3500 psi Pull test plug and install wear bushing. RD test equipment. PU BHA #3,9-7/8" directional drilling assembly. Shallow test MWD. RIH to 2834' Test 10-3/4" 45.5# casing to 3500 psi for 30 minutes. Cut and slip 52' of drilling line. Service top drive. Wash down from 2834', tag float collar at 3110'. Drill shoe track and rat hole to 3210', continue drilling 20' of new hole to 3230' RPM = 50 Torque = 7k FtLb GPM = 580 @ 1360 psi ROT 97k Displace well to new 9.1 ppg LSND mud. RPM = 50 GPM = 50 @ 1300 psi ROT 97k Perform LOT, EMW = 13.3 ppg. 575 psi surface pressure with 9.1 ppg mud at 2642' TVD. Calculated kick tolerance 149 bbls Establish baseline ECD = 9.67 ppg Drill 9-7/8" intermediate hole from 3230' to 3496', rotating 100% WOB = 20 klbs RPM = 80 Torque off Btm = 4.6k FtLb, Torque on Btm = 6-7k FtLb GPM = 600 @ 1520 psi on Btm, 1190 psi off Btm P/U 115k S/O 85k ROT 98k Backream every stand at 600 gpm and 80 rpm, reducing flow rate to 420 gpm on down stroke. Calculated ECD = 9.66 ppg, Actual ECD = 10.30 ppg POH 3 stands to shoe. Skakers blinding off apparently due to oil wetting of bentonite in new LSND mud. Blinding off of shakers required pump rate reductions, unable to drill ahead. Printed: 5/312004 8:46:01 AM . . ') ") .............................. '.,.......,........'.:..... B". '.'.' "...,...."J?". " .[E·X.RC(ØRAJGI0N;f·¡,.il..,. "', '., ....' , ,.',. ......,. , ,-, "".,',-,,,,. -,. ....-...".,"..".... "," -" ,..........,.., "',' ".' ".. . ,"':::,,: ,':"':',';/ :::,;:,::::' ..<~:,::<':::r 'H::, .:. ::.': :,: .:' ,":":,':. :',: "',' "...,!::-::~:::~.:<.:.,:'., ':. .:": :',',;';:::'.:': :',",'-',' ~' " , ' , . ,'" Óp~råtiðnè,sÛn1ri1'~ry'R<epôrt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To : Hours Task Code NPT Phase Description of Oper~tions 3/21/2004 13:00 - 17:00 4.00 DRILL N FLUD INTi , Circulate and condition mud at 50 gpm. Screened down shakers and circulated until the blinding problem was eliminated. Able to screen back up and circulate at drilling rate 17:00 - 17:30 0.50 DRILL N FLUD INTi RIH to 3400', wash to bottom at 3496' 17:30 - 18:30 1.00 DRILL P INT1 Stage up pumps and drill from 3496' to 3683'. WOB = 15 klbs RPM = 80 Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm P/U 117k S/O 90k ROT 105k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg 18:30 - 19:30 1.00 DRILL N RREP INTi POH to shoe. Lost oil pressure on the top drive lube pumps. Change out filter, regained oil pressure. 19:30 - 20:30 1.00 DRILL N RREP INTi RIH to 3589', wash to bottom at 3683' 20:30 : 21 :00 0.50 DRILL N INT1 Stage up pumps and drill from 3683' to 3776'. WOB = 15 klbs RPM = 80 Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm P/U 117k SIO 90k ROT 105k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg AST = 0.23 hrs. ART = 1.08 hrs. 21 :00 - 22:00 1.00 DRILL N RREP INTi POH to shoe. Lost oil pressure in the top drive lube pump again. 22:00 - 00:00 2.00 DRILL N RREP INT1 Change out top drive lube pump. 3/22/2004 00:00 - 01:00 1.00 DRILL N RREP INTi Continue change out top drive lube pump. 01 :00 - 01 :30 0.50 DRILL N RREP INT1 RIH to 3686', wash last stand to bottom at 3776' 01 :30 - 00:00 22.50 DRILL P INT1 Stage up pumps and drill from 3776' to 5844'. Sliding as required to maintain inclination and azimuth. WOB = 15 klbs RPM = 80 Torque off Btm = 6-7k FtLb, Torque on Btm = 8-16k FtLb GPM = 650 @ 2060 psi on Btm, 1735 psi off Btm PIU 148k S/O 11 Ok ROT 130k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Printed: 5/312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: BP EXPLORATI.ON Operations Summary Rep9rt L -201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From-To Hours Task Code NPT Phase 3/22/2004 01 :30 - 00:00 22.50 DRILL P INT1 3/23/2004 00:00 - 17:00 17:00 - 19:00 17.00 DRILL P 2.00 DRILL P 19:00 - 20:00 1.00 DRILL P INT1 20:00 - 21 :30 1.50 DRILL P INT1 21 :30 - 00:00 2.50 DRILL P INT1 3/24/2004 00:00 - 00:30 00:30 - 01 :00 0.50 DRILL P 0.50 DRILL P Df3scription.of@l?f3r~ti()p$· .. Calculated ECD = 9.87 ppg, Actual ECD = 10.00 ppg AST = 5.89 hrs. ART = 3.89 hrs. INT1 Formation tops: UG1 4775' MD, 3674' TVD Ma 5300' MD, 4020' TVD Directional drill from 5844' to 7055'. Sliding as required to maintain inclination and azimuth. WOB = 20-25 klbs RPM = 80 Torque off Btm = 7 -8k FtLb, Torque on Btm = 8-1 Ok FtLb GPM = 650 @ 2230 psi on Btm, 1993 psi off Btm P/U 147k SIO 106k ROT 125k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.02 ppg, Actual ECD = 10.37 ppg AST = 1.88 hrs. ART = 9.32 hrs. INT1 Formation Tops: OA 6048' MD 4441' TVD OBa 6227' MD 4513' TVD OBb 6372' MD 4560' TVD OBd 6996' MD 4664' TVD Circulate BU vol X 2, 670 gpm @ 2106 psi, reciprocate DP at 120 rpm. Calculated ECD = 10.02 Initial ECD = 10.42 ECD prior to POH = 10.19 Monitor well - static. POH 15 stands to 5751', no problems P/U 155k SIO 105k no pumps Pump dry job and continue POH. Attempting to swab at 3451', RIH to 3655' Stage up pumps and begin backreaming from 3655'. Backream out to 3451, attempting to pack off. RIH 1 stand to 3544'. Attempt to backream, still packing off. RIH another stand to 3683', bring pumps up to 600 gpm watching for ECD spikes. Able to circulate no problem, start backreaming out from 3683' 600 gpm @ 1247 psi and 85 rpm INT1 Midnight depth 3582' Continue backreaming out from 3582' to csg shoe at 3197'. 600 gpm @ 1250 psi and 90 rpm Pump hi-vis sweep around at csg shoe. 600 gpm @ 1200 psi INT1 Printed: 5/312004 8:46:01 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES From - To Hours . Task Code NPT Phase 3/24/2004 00:30 - 01 :00 0.50 DRILL P 01 :00 - 01 :30 0.50 DRILL P INT1 01 :30 - 03:30 2.00 DRILL P INT1 03:30 - 05:30 2.00 DRILL P INT1 05:30 - 06:30 1.00 DRILL P INT1 06:30 - 11 :00 4.50 DRILL P INT1 11 :00 ~ 12:00 1.00 DRILL P INT1 12:00 - 12:30 0.50 DRILL P INT1 12:30 - 15:00 2.50 DRILL P INT1 15:00 - 15:30 0.50 DRILL P INT1 15:30 - 16:30 1.00 BOPSUF P INT1 16:30 - 18:00 1.50 BOPSUP P INT1 18:00 - 20:00 2.00 CASE P INT1 20:00 - 20:30 0.50 CASE P INT1 20:30 - 00:00 3.50 CASE P INT1 3/25/2004 00:00 - 01 :30 1.50 CASE P INT1 01 :30 - 02:00 0.50 CASE P INT1 02:00 - 12:00 10.00 CASE P INT1 12:00 - 12:30 0.50 CEMT P INT1 12:30 - 14:00 1.50 CEMT P INT1 14:00 - 14:30 0.50 CEMT P INT1 14:30 - 17:00 2.50 CEMT P INT1 INT1 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations and 80 rpm Calculated ECO = 9.86 Actual ECD = 9.94 Service top drive RIH to 7055, wash last stand down. No problems on RIH. PIU 115k S/O 90k Stage up pumps and circulate BU volume X 3. Circulate lo-hi vis sweep surface to surface. 670 gpm @ 200 psi and 120 rpm. P/U 147k SIO 106k ROT 125k Torque = 10k FtLb Calculated ECO = 9.93 ECD prior to POH = 10.03 MOnitor well- static. POH 10 stands to 6125'. P/U 165k S/O 100k Slug DP and continue POH laying down 5" DP. RIH with 11 stands 5" DP from derrick Continue LDDP PJSM with Anadrill and all rig personnel on removing RA source and laying down BHA. LD BHA #3, remove source from AON. Clean and clear rig floor. Flush stack and pull wear bushing. Change top rams to 7-5/8". Install test plug and test door seals to 3500 psi. MU landing joint and make dummy run. RU 7-5/8" csg equipment. PJSM with Nabors Casing, MI and all rig personnel on running 7-5/8" csg. MU and test float equipment. RUN 7-5/8", 29.7#, L-80, BTC-M intermediate csg as per running orders. Midnight depth 1696' Continue Run 7-5/8",29.7#, l-80 csg from 1696' to 3197' at 1 minute per jt. Break circulation every 20 jts. Circulate 1.5 X csg vol at the 10-3/4" csg shoe. 7 bpm @ 350 psi. P/U 120k SIO 100k no pumps Continue running 7-5/8" csg into open hole. 1 minutef¡t above 5000', 1.5 minutef¡t below 5000'. Fill every jt, break circulation every 5 jts, circulate for 15 minutes every 15 jts. and CBU every 30 jts. Good displacement, no losses while running csg. RD fill-up tool. RU cement head. Stage up pumps and circulate and condition hole. Max rate 7 bpm @ 502 psi Reciprocate DP. P/U 225k S/O 110k PJSM with Schlumberger, MI and all rig personnel on cementing 7-5/8" csg. Air up and batch up cementers. Pump 5 bbl CW-100. Test lines to 3500 psi, pump remaining 20 bbls CW-100. Pump 45 Printed: 5/312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 8 of 34 BP EXPLORATION qþ~rations SUl11maryReport L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 3/25/2004 14:30 - 17:00 From ". To· Hours Task Code NPT Descriþtion .of· Op~rC:\tiþh~ 17:00 - 18:00 3/26/2004 18:00 - 19:30 19:30 - 20:00 20:00 - 22:00 22:00 - 00:00 00:00 - 13:00 13:00 - 14:00 14:00 - 15:00 2.50 CEMT P INT1 1.00 CEMT P INT1 1.50 CASE P 0.50 WHSUR P 2.00 CEMT P 2.00 CEMT P 13.00 CEMT P INT1 INT1 INT1 INT1 INT1 1.00 BOPSUP P 1.00 WHSUR P INT1 INT1 15:00 - 19:30 4.50 BOPSUF P INT1 19:30 - 20:30 1.00 BOPSUF P INT1 20:30 - 22:00 1.50 BOPSUP P INT1 22:00 - 00:00 2.00 DRILL P PROD1 3/27/2004 00:00 - 01 :00 1.00 DRILL P PROD1 01 :00 - 04:30 3.50 DRILL P PROD1 04:30 - 05:00 0.50 DRILL P PROD1 05:00 - 07:30 2.50 DRILL P PROD1 07:30 - 09:00 1.50 CASE P INT1 09:00 - 11 :30 2.50 DRILL N WAIT PROD1 11 :30 - 13:00 13:00 - 14:00 bbls 10.5 ppg Mud push. Drop bottom plug and pump 126 bbl (589 sxs) 15.8 ppg Class-G cement. Drop top plug and kick out with 10bbls water from cementers to wash up lines. Switch to rig pumps and displace with seawater at 7 bpm, ICP = 117 psi. Slow rate to 3 bpm to bring mud push around the shoe then increase rate back to 7 bpm. Able to reciprocate casing throughout cement job, land csg 290 bbls into displacement. Slow rate to 3 bpm for the last 20 bbls of displacement, FCP = 750 psi. Bump plugs with 1000 psi on calculated strokes, floats holding. CIP 17:45 RD cement head. LD landing joint and RD csg equipment. RILDS on packoff. Test packoff to 5000 psi. change top drive quill to 4" HT-40, change out bails. Clean mud and cement out from under rotary table. PJSM with all rig personnel. Install wear bushing. PU 4" DP, stand stands back in derrick. RU and inject 130 bbls 9.3 ppg mud down the 10-3/4" X 7-5/8" annulus. Lot EMW = 13.5 ppg, 580 psi surface pressure and a shoe TVD of 2642'. 3bpm ICP = 620 psi FCP = 550 psi SIP = 400 psi Change top rams to 3-1/2" X 6" variables RU Little Red, Test lines to 3500 psi. Inject 91 bbls dead crude down 10-3/4" X 7-518" annulus. ISP = 625 psi FCP = 890 psi SIP = 672 psi RU and test BOPE 250/3500 psi. Witness of BOP test waived by Chuck Sheave with AOGCC. Pull test plug. RD test equipment. Install wear bushing. PJSM with all rig personnel. Cut and slip 91' of drill line. Service top drive, blocks and crown. PU and MU BHA #4,6-3/4" directional assembly. Continue PU and MU BHA #4 RIH, picking up single joints of DP, to 4000'. Function test MWD. Continue RIH, picking up single joints of DP to 6892'. Wash down and tag cmt at 6933'. RU and test 7-5/8" csg to 3500 psi for 30 minutes. Waiting on trucks for MOBM displacement. Pull 9 stands of DP, Move 4" HT -40 HWDPin derrick to access 4" HT-38 HWDP. RIH with 4" HT-38 HWDP, POH Laying down. RIH with 4" HT-40 HWDP. PROD1 Pump 40 bbl MOBm spacer. Displace well to 9.2 ppg MOBM. 286 gpm @ 2500 psi. PROD1 Drill shoe track, rathole and 20' of new hole to 7075'. 1.50 DRILL P 1.00 DRILL P Torque off Btm = 3k FtLb, Torque on Btm = 4k FtLb GPM =286 @ 2620 psi on Btm, 2500 psi off Btm Printed: 5/312004 8:46:01 AM ') ') ··BP>E:XPLORATION Qpe.rati.Q,I1$. $~mma.ry R~port Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 . Date From - To Hours Task Code NPT ' Phase 3/27/2004 13:00 - 14:00 1.00 DRILL P PROD1 14:00 - 14:30 0.50 DRI LL P PROD1 14:30 - 15:30 1.00 DRILL P PROD1 Description of Operations CBU 286 gpm @ 2500 psi Perform 12.0 ppg EMW FIT. 680 psi, 9.2 ppg MOBM, 4673' TVD. 15:30 - 18:00 2.50 DRILL P Establish baseline ECD's ECD = 10.23 PROD1 Directional drill from 7075' to 7358', sliding as required to build angle and azimuth. 18:00 - 18:30 0.50 STKOH C WOB = 5-15 klbs RPM = 60 GPM = 280 @ 2900 psi on Btm, 2680 psi off Btm PROD1 POH from 7358' to 7130' for geologic plug back. 18:30 - 21 :00 2.50 STKOH C Well landed for horizontal section 6' TVD high to plan. Estimated formation dip in prognosis -2 degrees, actual formation dip <1 degree. The combination of these would have resulted in the loss of the entire lower OBd sand. Town engineering and geology staff were consulted and the decision was made to open hole sidetrack at 7130'. PROD1 Trench for sidetrack at 150 degrees right. Trench and drill from 7130' to 7358'. PROD1 Directional drill from 7358' to 7555', sliding as required to build angle and azimuth. 21 :00 - 00:00 3.00 DRILL P WOB = 5-15 klbs RPM = 65 Torque off Btm = 4.4k FtLb, Torque on Btm = 5.5k FtLb GPM = 280 @ 2750 psi on Btm, 2430 psi off Btm PIU 135k S/O 82k ROT 104k P/U 135k SIO 90k No pumps Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.22 ppg, Actual ECD = 10.77 ppg 3/28/2004 00:00 - 11 :00 11.00 DRILL P AST = 1.63 hrs. ART = 1.57 hrs. PROD1 Directional drill from 7555' to 8280', sliding as required to maintain angle and azimuth. WOB = 8-15 klbs RPM = 65 Torque off Btm = 5.4k FtLb, Torque on Btm = 6.5k FtLb GPM = 280 @ 3100 psi on Btm, 2564 psi off Btm P/U 134k S/O 83k ROT 108k P/U 143k 5/0 92k No pumps Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Printed: 51312004 8:46:01 AM SP. EXPLORATION Op~ratI()ns surij·rnªry.·Re:port pag$Jpqf34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES . Date From-To Hours Task Code NPT Phase 3/28/2004 00:00 - 11 :00 11.00 DRILL P PROD1 11 :00 - 11 :30 0.50 DRILL P PRODl 11 :30 - 14:30 3.00 DRILL P PRODl Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 .... DescriptionofOpe{é:iti~D~·· ... Calculated ECD = 10.55 ppg, Actual ECD = 11.13 ppg Service #2 mud pump, loose cable on traction motor Directional drill from 8280' to 9093', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 5.9k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 2950 psi on Btm, 2510 psi off Btm P/U 141k 5/079k ROT 107k P/U 150k 5/0 88k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. 14:30 - 15:30 1.00 DRILL P Calculated ECD = 10.61 ppg, Actual ECD = 10.90 ppg PRODl Circulate and condition while correlating geologic data. 15:30 - 21 :30 6.00 DRILL P 280 gpm @ 2510 psi and 70 rpm PRODl Directional drill from 9093' to 9870', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 6.5k FtLb, Torque on Btm = 7.7k FtLb GPM = 280 @ 3150 psi on Btm, 2614 psi off Btm P/U 148k 5/069k ROT 107k P/U 157k SIO 80k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.66 ppg, Actual ECD = 11.24 ppg 21 :30 - 00:00 2.50 DRILL P AST = 3.03 hrs. ART = 4.92 hrs. PRODl Condition hole for wiper trip to 7-5/8" csg shoe. Circulate BU volume X 2. Pump 10 bbl base oil sweep surface to surface. Circulate until ECD within 0.3 ppg of calculated. 3/29/2004 00:00 - 01 :30 1.50 DRILL P PROD1 01 :30 - 17:00 15.50 DRILL N RREP PROD1 17:00 - 17:30 0.50 DRILL P PROD1 17:30 - 19:30 2.00 DRILL P PRODl 19:30 - 20:00 0.50 DRILL P PROD1 296 gpm @ 2830 psi and 70 rpm Calculated ECD = 10.37 ECD prior to wiper trip = 10.56 Monitor well - static. POH on wiper trip to 7-5/8" csg shoe. No problems PJSM with all rig personnel. Change out top drive wash pipe and upper rotary seals. Service top drive and blocks RIH, work through tight spots at 8575' and 9230'. Wash last stand to bottom at 9870' Stage pumps to drilling rate, 280 gpm @ , and CBU Printed: 5/312004 8:46:01 AM ) ) ..... .... ;.L:BPEiXPl1l@RA,rION " '. ~~ . ' , Op,era~ion$Summary ,Report· . . . . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 .. Date '.From..; TQ. Hours Task· Code NPT Phase . Description of Operations 3/29/2004 20:00 - 00:00 4.00 DRILL P PROD1 Directional drill from 9870' to 10057', sliding as required to maintain angle and azimuth. WOB = 8-12 klbs RPM = 70 Torque off Btm = 6.6k FtLb, Torque on Btm = 7.5k FtLb GPM = 280 @ 3160 psi on Btm, 2660 psi off Btm P/U 146k S/O 80k ROT 107k P/U 156k S/O 84k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.49 ppg, Actual ECD = 11.04 ppg AST = 0.56 hrs. ART = 0.34 hrs. 3/30/2004 00:00 - 10:00 10.00 DRILL P PROD1 Drill 6-3/4" directional hole from 10057' to 11364', sliding as required to maintain angle and azimuth. WOB = 10-12 klbs RPM = 75 Torque off Btm = 7.9k FtLb, Torque on Btm = 9.0k FtLb GPM = 280 @ 3600 psi on Btm with 500 psi differential pressure P/U 154k S/O 62k ROT 100k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.72 ppg Actual ECD = 11.7 ppg 10:00 - 10:30 0.50 DRILL P PROD1 Circulate to reduce ECD. Riciprocate & rotate (75 rpm) drill string wihile circulating with 280 gpm @ 3050 psi. ECD after Circulating = 11.32 ppg 10:30 - 12:30 2.00 DRILL P PROD1 Drill 6-3/4" directional hole from 11364' to 11642', sliding as required to maintain angle and azimuth. WOB = 10-12 klbs RPM = 75 Torque off Btm = 7.9k FtLb, Torque on Btm = 9.0k FtLb GPM = 280 @ 3600 psi on Btm with 500 psi differential pressure P/U 154k S/O 62k ROT 100k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.72 ppg Actual ECD = 11.82 ppg 12:30 - 14:00 1.50 DRILL P PROD1 Circulate @ 11642' while evaluating geological well data. 14:00 - 16:00 2.00 DRILL P PROD1 Drill 6-314" directional hole from 11642' to 11831'. sliding as required to maintain angle and azimuth. WOB = 10-12 klbs Printed: 51312004 8:46:01 AM Page 12 of34 BPEXPLORA TION 9peratiQnsSùmmaryReport PROD1 RPM = 75 Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3290 psi on Btm with 280 psi differential pressure P/U 151k S/O 60k ROT 104k Drilling Time last 24 Hrs= 5.68 hrs ART = 3.12 Hrs AST = 2.56 Hrs. Survey & Connection time = 8.82 Hrs DFAL PROD1 Circulate while trouble shooting problem with MWD-GR tool. Backream up one stand to correlate MWD data. Gamma Counts prior to having problem was reading 80 CPS. Currently reading 10 CPS. Unable to rectify MWD-GR tool problem. Failure unknown at this time. Circulated 2 x bottoms-up from 11856' @ 280 gpm with 2880 psi. Calculated ECO =10.85 ppg Actual ECD after circulating = 11.06 ppg DFAL PROD1 POOH (Due to MWD tool failure) to 7-5/8M casing shoe with no problems. Hole in good condition. Flow check @ shoe. Well Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Task 'G9de NPT Phase 3/30/2004 2.00 DRILL P 14:00 - 16:00 16:00 - 19:00 3.00 DRILL P PROD1 19:00 - 20:00 1.00 DRILL P PROD1 20:00 - 21 :30 1.50 DRILL P PROD1 21 :30 - 22:00 0.50 DRILL P PROD1 22:00 - 00:00 2.00 DRILL N 3/31/2004 00:00 - 02:30 2.50 DRILL N Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 D~$qription of.c>þ~r~tjpns Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg Circulate & condition mudlhole for wiper trip. Circulate until ECO within 0.3 ppg of calculated. 280 gpm @ 2890 psi and 75 rpm Calculated ECD = 10.78 ppg ECD prior to wiper trip = 11.08 POOH for wiper trip from 11831' to 9590' (24 Stds) with no problems. Hole in good condition. Max drag 15k. TIH to 11736' with no problems. M/U TDS. Establish circulation. Precautionary wash & ream to bottom with no problems. No fill on bottom. Drill 6-3/4" directional hole from 11831' to 11856', sliding as required to maintain angle and azimuth. Had a fair amount of drill cuttings come over shakers on bottoms up from wiper trip. Note: Gamma-Ray tool generating incorrect data. WOB = 10-12 klbs RPM = 75 Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3290 psi on Btm with 280 psi differential pressure P/U 151k SIO 60k ROT 104k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg Printed: 5/312004 8:46:01 AM ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To· , Hours Task Code· NPT Phase Description ot Operations' 3/31/2004 00:00 - 02:30 2.50 DRILL N DFAL PROD1 static. 02:30 - 05:00 2.50 DRILL N DFAL PROD1 Continue POOH with drill string to top of BHA. 05:00 - 05:15 0.25 DRILL N DFAL PROD1 SAFETY --- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. 05: 15 - 07:00 1.75 DRILL N DFAL PROD1 Stand back Jars & NMDC's. Unload RA Source from LWD. UD MWD-LWD tool. Check mud-motor & bit (Bit in like new condition). Down-load MWD. 07:00 - 07:30 0.50 DRILL N DFAL PROD1 Clean Rig Floor. 07:30 - 07:45 0.25 DRILL N DFAL PROD1 SAFETY --- Held PJSM with Anadrill and all Rig personnel regarding picking up BHA & loading RA source. 07:45 - 09:30 1.75 DRILL N DFAL PROD1 MIU 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK. 09:30 - 12:00 2.50 DRILL N DFAL PROD1 TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7032'. 12:00 - 13:00 1.00 DRILL N DFAL PROD1 Service TDS. Slip & cut 78' of Drill Line. Reset & check C-O-M. Check brake system. 13:00 - 15:00 2.00 DRILL N DFAL PROD1 Continue TIH to 11600' with no problems. 15:00 - 16:00 1.00 DRILL N DFAL PROD1 M/U TDS. Establish circulation. Stage pumps to 280 gpm with 2520 psi + 70 rpm. Perform MADD PASS from 11600'-11856'. 16:00 - 21 :00 5.00 DRILL P PROD1 Drill 6-3/4" directional hole from 11856' to 12327', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 75 Torque off Btm = 8.0k FtLb, Torque on Btm = 10k FtLb GPM = 280 @ 3480 psi on Btm with 200 psi differential pressure P/U 155k SIO 59k ROT 103k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.90 ppg Actual ECD = 11.39 ppg Drilling Time last 24 Hrs= 2.15 hrs ART = 1.08 Hrs AST = 1.07 Hrs. Survey & Connection time = 2.85 Hrs 21 :00 - 23:30 2.50 DRILL C PROD1 Circulate @ 12327' while evaluating geological well data. Note: Due to a unaccceptable amount of pay zone drilled, a decision was made by the BP Drilling department to perform a Open Hole sidetrack at 10585' MD. Circulate hole clean (2 x Btm-up vol) with 280 gpm @ 2870 psi. Reciprocate & rotate drill string (75 RPM) while circulating. ECD after circulating: Calculated ECD = 10.90 Actual ECD = 11.20. P/U 155k SIO 59k Rot Wt 103k 23:30 - 00:00 0.50 DRILL C PROD1 Flow check. Well static. Blow down TDS. -POOH for Open-hole Sidetrack from 12327' to 11453'-midnight depth. Hole in good shape. Max drag 15k. 4/1/2004 00:00 - 00:30 0.50 DRILL C PROD1 POOH from 11453' to 10565' for Open-hole Sidetrack. Hole in good shape. Max drag 15k. 00:30 - 01 :30 1.00 STKOH C PROD1 Break circulation. Stage pumps to 280 gpm wI 2730 psi. Orient TF to 140 deg LHS for Open Hole Sidetrack. Start trenching from 10565' to 10585'. NOTE: AIM tool quit working. 01 :30 - 02:30 1.00 STKOH X DFAL PROD1 Circulate & work drill string @ 10585' while trouble shooting problem with AIM Tool. Unable to rectify problem. Printed: 5/312004 8:46:01 AM BP EXPLORATION . . ~ ' : . , . ',' ;"', " "".. , ·Operations>Su.m maryR~port Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date From - To Hours Task COdeNPT :Phase 4/1/2004 02:30 - 04:00 1.50 STKOH X DFAL PROD1 04:00 - 06:30 2.50 STKOH X DFAL PROD1 06:30 - 06:45 0.25 STKOH X DFAL PROD1 06:45 - 09:00 2.25 STKOH X DFAL PROD1 09:00 - 14:00 5.00 BOPSUP X DFAL PROD1 14:00 - 14:15 0.25 STKOH X DFAL PROD1 14:15 - 15:30 1.25 STKOH X DFAL PROD1 15:30 . 18:00 2.50. STKOH X DFAL PROD1 18:00 - 19:30 1.50 STKOH X DFAL PROD1 19:30 - 21 :00 1.50 STKOH X DFAL PROD1 21 :00 - 21 :30 0.50 STKOH X DFAL PROD1 21 :30 - 00:00 2.50 DRILL C PROD1 4/2/2004 00:00 - 14:25 14.42 STKOH C PROD1 Page 140f<34 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operåtions POOH from 10585' to 7-5/8" Casing Shoe @ 7047' with no problems. Hole in good condition. Flow check @ shoe. Well static. Continue POOH from 7047' to top of BHA. SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Stand back Jars & NMDC's. Remove RA Source. UD MWD-LWD tool, mud-motor & bit (Bit in good condition). Held PJSM. Pull wear bushing. Run BOP Test Plug on 4" DP. Rig Up Testing Equipment - Test BOP & Related Surface Equipment: Test Annular, Upper And Lower Pipe Rams, Blind Rams, Manual & HCR Valves on C/K Lines, Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. Perform Accumulator Test. Blow down lines. Rig Down testing Equipment The BOP Test witnessed By AOGCC Inspector John Crisp. SAFETY--- Held PJSM with Anadrill and all Rig personnel regarding picking up BHA & loading RA source. MIU 6-3/4" Steerable Drilling assembly (BHA #6). Shallow test MWD-OK. TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7-5/8" Casing Shoe @ 7047'. Service TDS. Slip & cut 37' of Drill Line. Reset & check C-O-M. Check brake system. Continue TIH to 10522' with no problems. M/U TDS. Establish circulation. Stage pumps to 280 gpm with 2820 psi. Wash down to 10565'. Orient TF to 140 deg LHS for Open Hole Sidetrack 02. Trench from 10565' to 10585'. Sidetrack well & Drill 6-3/4" directional hole from 10585' to 10615', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 2820 psi on Btm with 100 psi differential pressure P/U 153k S/O 83k ROT 105k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.00 ppg Actual ECD = 10.96 ppg Drilling Time last 24 Hrs= 1.79 hrs ART = 0.60 Hrs AST = 1 .19 Hrs. Survey & Connection time = 0.71 Hrs Drill 6-3/4" directional hole from 10615' to 12327', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 7.9k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3500 psi on Btm with 250 psi differential pressure Printed: 5/3/2004 8:46:01 AM ) ) BP EXPLORATION Operations Suml1'1ary Report .'.,'..' ',e~ø~'18:,Ç>f.ª4 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 :¡::,:--Pate From - To Hours Task, Code NPT Phase Description of Operations 4/212004 00:00 - 14:25 14.42 STKOH C PROD1 P/U 150k S/O 52k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 14:25 - 17:45 3.33 STKOH C PROD1 17:45 - 19:00 1.25 DRILL P PROD1 19:00 - 19:30 0.50 DRILL P PROD1 Calculated ECD = 10.90 ppg Actual ECD = 11.85 ppg Drill ahead in 63/4" hole from 12327' to 12732' MD (original depth). Drilling parameters as above. Circulate to reduce ECD. Reciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3230 psi. ECD after Circulating = 11.32 ppg Drill 6-3/4" directional hole from 12732' to 12800', sliding as required to maintain angle and azimuth. 19:30 - 20:00 0.50 DRILL P Calculated ECD = 10.93 ppg Actual ECD = 11.72 ppg PROD1 Circulate @ 12800' to reduce ECD. Riciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3230 psi. ECD after Circulating = 11.30 ppg PROD1 Drill 6-3/4" directional hole from 12800' to 13073', sliding as required to maintain angle and azimuth. WOB = 10-18 klbs RPM = 70 Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 3500 psi on Btm with 250-300 psi differential pressure P/U 150k SIO 52k ROT 103k 20:00 - 00:00 4.00 DRILL P Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30', Calculated ECD = 11.26 ppg Actual ECD = 11.77 ppg 4/312004 00:00 - 05:00 5.00 DRILL P On Bottom Drilling Time last 24 Hrs= 10.73 hrs ART = 5.29 Hrs AST = 4.81 Hrs. Survey & Connection time = 11.52 Hrs PROD1 Drill 6-3/4" directional hole from 13073' to 13580'. Sliding as required to maintain angle and azimuth. WOB = 5-15 klbs RPM = 70 Torque off Btm = 8.2k FtLb, Torque on Btm = 10-11k FtLb GPM = 280 @ 3520 psi on Btm with 250-300 psi differential pressure P/U 156k SIO 56k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 05:00 - 06:00 1.00 DRILL P Calculated ECD = 10.90 ppg Actual ECD = 11.64 ppg PROD1 Circulate to reduce ECD. Riciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3140 psi. ECD after Circulating = 11.15 ppg PROD1 Drill 6-314" directional hole from 13580' to 13698' TD. Sliding as required to maintain angle and azimuth. 06:00 - 07:00 1.00 DRILL P Printed: 51312004 8:46:01 AM BP EXPLORATION ()peratiori~··SUní:Q1à~y·:·R·~port legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: l -201 L -201 DRlll+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Page 16 of .34 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Qatß ~rÖw~To Hours Task Code NPT 4/312004 06:00 - 07:00 1.00 DRILL P PROD1 07:00 - 12:00 5.00 DRILL P PROD1 12:00 - 15:30 3.50 DRILL P PROD1 15:30 - 16:30 16:30 - 19:30 19:30 - 23:00 1.00 DRILL P 3.00 DRILL P 3.50 DRILL P PROD1 PROD1 PROD1 23:00 - 00:00 1.00 DRILL P PROD1 4/4/2004 00:00 - 04:30 4.50 DRILL P PROD1 04:30 - 05:30 1.00 DRILL P PROD1 05:30 - 08:30 3.00 DRILL P PROD1 08:30 - 08:45 0.25 DRILL P PROD1 08:45 - 10:30 1.75 DRILL P PROD1 10:30 - 11 :00 0.50 DRILL P PROD1 11 :00 - 11 :30 0.50 CASE P CaMP Description of OPE3rations WOB = 5-15 klbs RPM = 70 Torque off Btm = 8k FtLb, Torque on Btm = 11 k FtLb GPM = 280 @ 3500 psi on Btm with 250-300 psi differential pressure P/U 150k SIO 52k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.90 ppg Actual ECD = 11.40 ppg On Bottom Drilling Time = 2.27 hrs ART = 1.8 Hrs AST = 0.47 Hrs. Survey & Connection time = 3.73 Hrs Circulate & condition mud/hole from 13698'. Increase pump rate to 300 gpm with 3425 psi. Pump 25 bbl LoNis sweep. Circulate hole clean (4.5 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Pump slug. Calculated ECD = 10.88 ppg ECD prior to Wiper Trip = 11.09 ppg POOH (Wiper Trip) to 7-5/8" Casing Shoe @ 7047'. Had one tight spot @ 11880'. Max over-pull = 35k. Worked through same with no other problems. Hole in good condition. Average drag 10-15k P/U 170k SIO 63k Off bottom with no pump. Service TDS. TIH with drill string to 13602' with no problems. MIU TDS. Establish circulation. Precautionary wash & ream to bottom @ 13698' with no problems. Circulate & condition mudlhole from 13698'. Increase pump rate to 300 gpm with 3350 psi. Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Calculated ECD = 10.96 ppg ECD prior to Wiper Trip = 11.09 ppg Flow check. Well static. Pump slug. POOH to run 4.5" Slotted Production Liner. P/U 160k SIO 75k Off bottom with no pump. POOH from 13231' to 7000' (7-5/8" Shoe @ 7047') with no problems. Hole in good condition. Max Drag 5-1 Ok. Drop Circ-Sub opening dart. Break circulation, pump dart on seat. Open circ-sub (Placed @ 175' above bit) with 1800 psi. Stage pumps to 575 gpm with 3380 psi. Reciprocate & rotate (70 RPM) while circulating from 6825'. No drilling cuttings observed from Btms-up. Flow check. Well static. Pump slug. Continue POOH from 7000' to top of BHA. SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Remove RA Source. UD Anadrill Directional tools. Clean Rig Floor. R/U 4.5- Casing tongs & Liner Running equipment. Printed: 5/312004 8:46:01 AM ) ) CaMP SAFETY --- Held PJSM with rig crew & BOT personnel regarding running liner & PIU Liner Hanger-Packer assembly. COMP MIU 4-1/2" Guide Shoe Jt + 159 Jts of 4-1/2" 12.6# L-80 IBT-M slotted liner + 14 Jts of 4.5" 12.6# L-80 IBT-M solid liner & BOT "Flex-Lock" Liner Hanger wI ZXP Liner Top Packer. Total length = 7240.49' Liner String wt = 55k. COMP RIH with 4-1/2" 12.6# Slotted liner assembly on 4" DP to 13680' with no problems. P/U & place 4.5" liner Shoe @ 13672'. P/U 165k SIO 69k CaMP Drop 29/32" setting ball down DP. Pump on seat @ 4 bpm wI 600 psi. Once ball seated increased pressure to 2000 psi to set "Flex-Lock" Liner Hanger. SIO 35k on Hanger. Continue pressuring up to 3000 psi to set ZXP Packer. Pressure up to 4000 psi. Ball seat did not shear. P/U 12' above TBR & release packer setting dogs. Set 50k on ZXP packer to ensure proper setting. The 4.5" Slotted Liner Shoe set @ 13672' with top of liner @ 6432'. P/U on string placing end of DP @ 6358'. CBU @ 7 bpm wI 1520 psi. Flow check. Pump slug. POOH from 6358' with 4 H DP. Finish POOH from 4700' with 4" DP. UD BOT Liner Hanger Running Tool. Clear & clean Rig Floor. Slip & cut 93' of drill line. Reset & check C-O-M. Adjust brakes. Service TDS. SAFETy---- Held PJSM with Rig Crew, Baker Oil Tools Rep & Anadrill personnel regarding PIU Whipstock + BHA. M/U L 1 (OBb) Whipstock assembly. Orient with MWD. P/U 9 x 4-3/4" DC. RIH with 4" HWDP. POOH from 1100' to change Whipstock spaceout. UD 1 Jt of 3.5" HWDP & Flex Jt. MIU Whipstock. Reorient with MWD. Shollow test MWD-OK. TIH with L 1 Whipstock assembly on 4" DP to 6398' (End of seals on Spaceout assembly). M/U TDS. Estabish circulation. Orient whipstock 15 deg LHS. Stab dummy seal assembly into Top of tie-back sleeve (11' sleeve) @ 6432'. Set down 20k to set whipstock anchor. P/U 10k over to verify anchor set. Set down 40k to shear whipstock lug. WEXIT Attempt to pressure test 7-5/8" casing to 1000 psi-Bleeding off. Check all surface equipment. Found no surface leaks. Attempted to test several times. Pressure bled off to 700 psi & holding. Consult with ODE. Consensus was to continue as per program. WEXIT Mill Window in 7-5/8" casing from 6372 to 6384' and drill 14' of new hole to 6398'. Work mills through window with no problems. NOTE: Window cut in 7-5/8" csg FI 6372' to 6384' WOB = 2-12k RPM = 70-114 Torque = 6500 KFtLb GPM = 250 @ 1500 psi Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Task code NPT Phase, 4/4/2004 11 :30 - 12:00 0.50 CASE P 12:00 - 18:00 6.00 CASE P 18:00 - 21 :00 3.00 CASE P 21 :00 - 22:00 1.00 CASE P 22:00 - 23:00 1.00 CASE P COMP 23:00 - 00:00 1.00 CASE P COMP 4/5/2004 00:00 - 02:30 2.50 CASE P COMP 02:30 - 04:00 1.50 CASE P COMP 04:00 - 04:15 0.25 STWHIP P WEXIT 04:15 - 07:00 2.75 STWHIP P WEXIT 07:00 - 12:00 5.00 STWHIP N HMAN WEXIT 12:00 - 14:30 2.50 STWHIP P WEXIT 14:30 - 15:00 0.50 STWHIP P WEXIT 15:00 - 16:00 1.00 STWHIP P 16:00 - 20:00 4.00 STWHIP P Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 ..... ..,. . . Description of OperationŠ Printed: 51312004 8:46:01 AM BP EXPLORATION Operations Summélry·.Report Page18 0134 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 :·Date· From '-.. To Hqurs Task Code NPT Phase Descripti()~lºf()pératio~$ 4/5/2004 16:00 - 20:00 4.00 STWHIP P WEXIT PIU 129k S/O 92k Rotate Wt = 101 k 20:00 - 21 :00 1.00 STWHIP P WEXIT Pump Hi-vis sweep & circulate hole clean from 6398' wI 290 gpm @ 1800 psi. Reciprocate & rotate drill string (110 RPM) while circulating. 21 :00 - 21 :30 0.50 STWHIP P WEXIT Perform FIT. Pressure up on formation to 665 psi with 9.2 ppg MOBM @ 4562' TVD = 12.0 ppg EMW. Flow check. Well static. Pump slug. Blow down TDS & related equipment. 21 :30 - 00:00 2.50 STWHIP P WEXIT POOH with Mill Assy & 4" DP to top of BHA. 4/6/2004 00:00 - 01 :30 1.50 STWHI P P WEXIT UD 9 x 4-3/4" DC, BOT mills & related equipment. Clear rig floor of excess whipstock milling equipment. 01 :30 - 02:30 1.00 STWHIP P WEXIT M/U ported sub. Flush out BOP's. UD sub. Blow down TDS, C/K Lines & all Surface equipment in preparation for BOP Test. Pull wearbushing. 02:30 - 06:30 4.00 BOPSUP P WEXIT Held PJSM. RIH with BOP Test Plug on 4" DP & seat in wellhead. Rig Up Testing Equipment - Test BOP & Related Surface Equipment: Test Annular, Upper And Lower Pipe Rams, Blind Rams, Manual & HCR Valves on C/K Lines, Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. RID Test Equipment. Pull test plug. Install wearbushing. Blow down surface lines. Witness Of BOP Test Waived By AOGCC Inspector John Spaulding. 06:30 - 07:00 0.50 DRILL P WEXIT SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding picking up BHA tools & installing RA Source. 07:00 - 09:00 2.00 DRILL P WEXIT M/U (L 1, OBb) 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK. 09:00 - 12:00 3.00 DRILL P WEXIT TIH with 6-3/4" Drilling assembly on 4" DP to 6350'. 12:00 - 12:30 0.50 DRILL P WEXIT M/U TDS. Establish circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. RIH (L 1 lateral) to 6388' without any problems. Establish baseline ECD of 10.49 ppg @ 280 gpm + 70 rpm. Wash & ream from 6388' to 6398'. 12:30 - 00:00 11.50 DRILL P PROD2 Drill 6-3/4" directional hole from 6398' to 7638'. Sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 4.5k FtLb, Torque on Btm = 7.0k FtLb GPM = 280 @ 2750 psi on Btm with 300-375 psi differential pressure PIU 125k S/O 80k Rot Wt 95k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.40 ppg Actual ECD = 10.9 ppg On Bottom Drilling Time last 24 Hrs= 7.42 hrs ART = 4.52 Hrs AST = 2.9 Hrs. Survey & Connection time = 4.08 Hrs 4n12004 00:00 - 15:00 15.00 DRILL P PROD2 Drill 6-3/4" directional hole from 7638' to 9559'. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs Printed: 5/312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 4(712004 418/2004 ) ) BP EXPLORATION . . . . ~". Operatiqris .Summary Report Page 19 of 34 L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations' 00:00 - 15:00 From - To Hours Task Code· NPT Phase 15.00 DRILL P PROD2 RPM = 65 Torque off Btm = 5.5k FtLb, Torque on Btm = 8.0k FtLb GPM = 280 @ 3100 psi on Btm with 300-375 psi differential pressure P/U 141k SIO 72k Rot Wt 103k 15:00 - 18:30 18:30 - 20:00 20:00 - 21 :30 21 :30 - 23:00 23:00 - 00:00 00:00 - 22:00 Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 3.50 DRILL P Calculated ECD = 10.72 ppg Actual ECD = 11.23 ppg PROD2 Circulate & condition mud/hole prior to wiper trip from 9559'. Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (75 rpm) while circulating. Flow check. Well static. Pump slug. 1.50 DRILL P Calculated ECD = 10.76 ppg ECD prior to Wiper Trip = 10.86 ppg PROD2 Wiper trip. POOH to 6368' (7-5/8" window @ 6372'-6384') with no problems. Max drag 25k. Average drag 10-15k. PROD2 Service TDS. Change out Actuator on Lower IBOP valve. PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. TIH (L 1 lateral) to 9466' with no problems. MIU TDS. Precautionary wash & ream to bottom. No fill. Pump 20 bbl Lo-vis sweep. PROD2 Drill 6-3/4" directional hole from 9559' to 9589'. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 5k FtLb, Torque on Btm = 7.5k FtLb GPM = 280 @ 3100 psi on Btm with 300-375 psi differential pressure P/U 140k SIO 72k Rot Wt 103k 1.50 DRILL P 1.50 DRILL P 1.00 DRILL P Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.76 ppg Actual ECD = 11.23 ppg 22.00 DRILL P On Bottom Drilling Time last 24 Hrs= 5.88 hrs ART = 3.63 Hrs AST = 2.25 Hrs. Survey & Connection time = 10.12 Hrs PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 9589' to 12172'. Sliding as required to maintain inclination and azimuth. **** NOTE: Drilled out the top of the OBb Zone **** WOB = 10-15 klbs RPM = 65 Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3350 psi on Btm with 300-400 psi differential pressure P/U 149k S/062k Rot Wt 97k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Printed: 51312004 8:46:01 AM BPEXPLORATION Qp'erations,Sumn1ê1ry·· Report Page?0.öf.34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Descripti{)1'l of Op~Jations Date From -To -fPt.tts ,'Task Code NPT Phase 4/8/2004 00:00 - 22:00 22.00 DRILL P PROD2 Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg 22:00 - 22:15 0.25 STKOH C PROD2 22: 15 - 00:00 1.75 STKOH C PROD2 4/9/2004 00:00 - 02:00 2.00 STKOH C PROD2 On Bottom Drilling Time last 24 Hrs= 7.94 hrs ART = 4.9 Hrs AST = 3.04 Hrs. Survey & Connection time = 14.06 Hrs POOH (2 Stds) to 11933' for Geological Sidetrack after exiting the top of the OBb sand. Break circulation. Stage pumps to 280 gpm wi 2800 psi. Orient TF to 135 deg RHS for Open Hole Sidetrack. Start trenching from 11933' to 11953'. Perform open hole sidetrack in the L 1 (OBb) lateral. Time drill from 11953' to 11963'. 02:00 - 05:30 3.50 STKOH C WOB = 0-2k GPM = 280 @ 2800 psi P/U 149k S/O 62k Rot Wt 97k PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 11963' to 12172' (original depth). Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3350 psi on Btm with 300-400 psi differential pressure P/U 149k. S/O 62k. Rot Wt 97k. Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke, Survey every 30'. 05:30 - 19:45 14.25 DRILL P Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg PROD2 Continue drilling 6-3/4" L 1 lateral from 12172' to 13540' TD I 4565' TVD. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 8k FtLb, Torque on Btm = 9-12k FtLb GPM = 280 @ 3300 psi on Btm with 300-350 psi differential pressure P/U 161k S/O 48k Rot Wt 100k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 11.05 ppg Actual ECD = 11.55 ppg 19:45 - 23:00 3.25 DRILL P On Bottom Drilling Time last 24 Hrs= 7.7 hrs ART = 3.7 Hrs AST = 4.0 Hrs. Survey & Connection time = 12.30 Hrs PROD2 Circulate & condition mud/hole prior to wiper trip from 13540', Circulate hole clean (3 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Printed: 5/3/2004 8:46:01 AM · " ) ) BR.:>5X8lLQIR~mIQ~: Operations .Summary Report Pagé21 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 ~i:,.;:,:"i··P,C6\te, From-To' Hours Ta.sk COde NPT Phásé F' Description of Operations 4/9/2004 19:45 - 23:00 3.25 DRILL P PROD2 Calculated ECD = 10.96 ppg ECD prior to Wiper Trip = 11.01 ppg 23:00 - 00:00 1.00 DRILL P PROD2 Wiper trip. POOH to 12606' with no problems. Max drag 20k. Average drag 10-15k. P/U Off Btm no pump = 175k S/O 60k. 4/10/2004 00:00 - 02:30 2.50 DRILL P PROD2 Continue wiper trip. POOH from 12606' to 6368' (7-5/8" window @ 6372'-6384') with no problems. Max drag 25k @ 10679'. Average drag 10-15k. 02:30 - 04:00 1.50 DRILL P PROD2 Slip & cut 71' of drill line. Reset & check C-O-M. Check Drawworks brakes. Service TDS. 04:00 - 08:00 4.00 DRILL P PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. TIH to 13475'. Encountered tight hole from 10730' to 10965' & at 11830' with 25k down drag. Work through same with no other problems. 08:00 - 13:45 5.75 DRILL P PROD2 M/U TDS. Establish circulation. Precautionary wash & ream to bottom @ 13540' with no problems. Circulate & condition mud/hole with 280 gpm @ 3070 psi. Circulate hole clean with 5.3 x Btms-up. Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Pump slug. Calculated ECD = 11.01 ppg Actual ECD = 11.44 ppg ECD prior to Trip = 11.01 ppg 13:45 - 17:30 3.75 DRILL P PROD2 POOH from 13540' to 6559' with no problems. Place Circ-Sub at bottom of whipstock. Hole in good condition. Average Drag 5-15k. PIU 172k S/O 60k off bottom with no pump. 17:30 - 18:00 0.50 DRILL P PROD2 Drop Circ-Sub opening dart. Break circulation, pump dart on seat. Shear circ-sub with 2180 psi (Placed @ 175' above bit). Stage pumps to 200 gpm with 500 psi. P/U on drill string washing by window & across whipstock face. Pull bit inside 7-5/8- casing to 6364'. 18:00 - 19:00 1.00 DRILL P PROD2 Pump Lo-vis sweep. Circulate hole clean from 6189' with 450 gpm @ 2020 psi. Reciprocate & rotate (65 RPM) while circulating. No drill cuttings observed from Btms-up. Flow check. Well static. Pump slug. 19:00 - 21 :30 2.50 DRILL P PROD2 Continue POOH with drill string to top of BHA. 21 :30 - 21 :45 0.25 DRILL P PROD2 SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. 21 :45 - 23:30 1.75 DRILL P PROD2 Remove RA Source. UD all Anadrill Directional tools & bit. 23:30 - 00:00 0.50 DRILL P PROD2 Clear & clean rig floor. 4/11/2004 00:00 - 00:15 0.25 STWHIP P PROD2 SAFETY--- Held PJSM with rig crew, Anadrill & Baker personnel regarding M/U Whipstock retrieving tool (WSRT) & BHA. 00:15 - 01 :30 1.25 STWHIP P PROD2 M/U WSRT & BHA which consists of the following: Whipstock Hook retrieving tool + 1 Jt of 3.5- HWDP + FS + MWD + Bumper-Sub + Oil Jar + 12 x 4-314- DC + XO + 24 x 4- HWDP = 1199.63'. Shallow test MWD-OK. 01 :30 - 03:30 2.00 STWHIP P PROD2 TIH with WSRT BHA on 4- DP to 6328'. 03:30 - 04:00 0.50 STWHIP P PROD2 M/U TDS. Break circulation. Stage pumps to 244 gpm w/1330 psi. Orient WSRT to 15 deg LHS. (P/U Wt 132k S/O Wt 90k). Slack off on drill string to 6378'. P/U & engage whipstock. Pull on whipstock with 60k overpull, no release. Jar on whipstock 3 additional times with 65k over pull & release Printed: 5f3I2OO4 8:46:01 AM BP EXPLOHA TION Opçrati()nsSLJnll11é1ryReport Page 22 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From,:" To Hours Task Code NPT . Phase Description qf Operatiof)~ 4/11/2004 03:30 - 04:00 0.50 STWHIP P PROD2 whipstock. P/U & pull seals out of bottom tie-back receptacle. Pull whipstock up to 6358' (P/U Wt = 138k). Monitor well 5 minutes. Annulus level fell +1- 20'. 04:00 - 05:00 1.00 STWHIP P PROD2 CBU from 6358' with 200 gpm @ 875 psi. Lost 12 bbl mud at start of circulating. Lost another 2 bbl mud while circulating Btms-up. Flow check. Fluid level dropping very very slow. Pump slug. 05:00 - 07:30 2.50 STWHIP P PROD2 POOH with whipstock assembly #1 to top of BHA. 07:30 - 11 :00 3.50 STWHIP P PROD2 Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock retrieving tool, L 1 Whipstock & 3.5" DP space-out assembly. 100% recovery of all Whipstock & downhole tools. Clear & clean rig floor. 11 :00 - 12:00 1.00 CASE P COMP Rig up 4.5" Liner running equipment. 12:00 - 12:15 0.25 CASE P COMP SAFETY--- Held PJSM with rig crew & BOT personnel regarding running liner & P/U Hook Hanger assembly. 12:15 - 19:30 7.25 CASE P COMP MIU 4-1/2" Float Shoe (Bent) Jt + 155 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner'. Continue TIH. Tag up on the "Mother Bore" liner top packer @ 6432'. POOH to 6378' which is mid-point of window. Apply one round of RHT in string. Slack off & exit 7-5/8" window into open hole with no other problems.Continue running 15 additional Jts of 4.5" slotted liner (170 Jts Slotted) + 1 Jt of solid liner + XO Pup Jt & BOT Flanged Hook Hanger assembly. Total length = 7138.16' P/U Wt = 98k S/O Wt = 70k Theoretical Liner Wt in mud = 77,500 Lbs 19:30 - 20:00 0.50 CASE P COMP Change elevators to fit 4" DP. RID Hydraulic Casing Tongs & related equipment. 20:00 - 00:00 4.00 CASE P COMP Continue RIH with 4-1/2" slotted liner on 50 Stds of 4" DP to 11809' . P/U 148k SIO 55k 4/12/2004 00:00 - 01 :00 1.00 CASE P CaMP Continue RIH with 4.5" Slotted Production liner from 11809'. Tag-up solid @ 13163'. Note: Had 50 Stds of 4" DP + 8 stds 4" HWDP + 4 stds 4-3/4" DC's + 2 stds & double of 4" DP . Work string 60' up & down four times. Stacking out all available weight with string stopping @ 13163' each time. 01 :00 - 02:00 1.00 CASE P COMP MIU TDS. Establish circulation. Stage pumps to 6 bpm @ 1200 psi to help reduce friction between drill string & casing. Continue working string 30' to 60'. String starting to move down slowly. Reduce pump rate to 3 bpm with 365 psi. Continue working string down from 13163' to 13516' (That places the Hook-Hanger 10' past bottom of 7-5/8" window @ 6384'). Stop pumps. P/U 200k SIO 58k 02:00 - 02:30 0.50 CASE P CaMP P/U on string & position Hook-Hanger @ 6340'. Rotate 1/4 tum. Run in & go past hook point. Pull back up with Hook-Hanger to 6340'. Rotate additional 1/4 turn. Run back down & land Hook-Hanger on the lower lip of 7-5/8" window @ 6384'. Reconfirm Hook-Hanger landed by picking up 20' & relanding same. Did this three times with Hook-Hanger landing out in same spot every time. Stack out all available string weight + 10k from TDS down on Hook-Hanger (+1- 33k). 02:30 - 03:30 1.00 CASE P COMP Drop 29/32" ball & pump on seat. Pressure up to 2700 psi to Printed: 5/312004 8:46:01 AM ) caMP release HWH Running tool. P/U Drill string 10' (P/U 135k) & verify HWH Running tool released. Lost 60k string wt. Set back down & tag Hook-Hanger with 25k-OK. P/U on string & place HWH Running tool @ 6335' (32' above Hook Hanger @ 6367'). R/U Side Entry Pump-in sub into the 4" DP. Pressure up to 4750 psi & blow ball seat. RID pump-in sub. M/U TDS. CBU from 6335' with 6 bpm @ 960 psi. Flow check. Well static. Pump slug. Blow down TDS. POOH with 4" DP from 6335' to surface. UD Baker HWH Running tool. Clear & clean rig floor. SAFETY ---- Held PJSM with Rig Crew & Baker Service Rep regarding P/U LEM & ZXP Packer assembly. M/U LEM/ZXP assembly on 4" DP. TIH with LEM/ZXP assembly on 60 Std of 4" DP + 8 Std of 4" HWDP to 6316'. M/U TDS. RIH slowly to 6330'. Establish up & down string weights, P/U 125k S/O 100k. Slack off on string to set the LEM into the hook hanger collet @ 6362' with the 4.75" aD Seals stung into the Lower (OBd lateral) Seal Bore Extension @ 6475'. Land LEM with 20k. P/U 10k to verify set, then slack off 10k on ZXP packer & park pipe. Drop the 29/32" setting ball and pump onto seat @ 2 bpm wI 210 psi. Pressure up to 2500 psi, wait 2 minutes, then increased pressure to 2900 to set the ZXP packer. At this point in time while pressuring up to release the Baker Type "HRD" Packer Setting tool which was pinned to shear @ 3600 psi, the ball seat sheared prematurely at 33S0 psi. COMP Pressure test ZXP Packer x 7-S/8" casing to 1S00 psi for 15 minutes. Lost 7S psi. DFAL CaMP Attempt to release from ZXP Packer. Work string up to 13Sk (1Ok Over-pull) & down to 50k with no success. Apply 2.5 Left Hand turns into string. Work torque down & attempt to release Packer Setting Tool. Tool would not release. Pull up to 150klbs (-25 klbs over PU wt). Still not indicating that Setting tool is released from L TP assembly. NOTE: The Baker Type "HRD" Setting Tools primary releasing mechanism is hydraulic with an emergency mechanical back-up Left-hand release. DFAL CaMP 9ES Rig Team discussed downhole tool failure problem with the BP ODE & Baker Engineers. After evaluating the options it was decided to drop a 1.7S" aD Steel Ball down the string, let gravitate on seat. Then pressure up to 4200 psi on the drill pipe to ensure that the ZXP Packer & Hold Down slips are fully set & also to shear the hydraulic release mechanism on the Packer Setting tool. DFAL COMP Waiting on Baker to deliver a 1.75" aD Steel Ball to the rig. DFAL COMP Break off TDS from DP. Drop the 1.75" aD Steel Ball down 4" DP. M/U TDS. Let ball gravitate on seat. DFAL CaMP Pressure up on drill string to 4200 psi. Hold for 10 minutes. Release pressure. P/U on string. Packer Setting tool free. P/U 12' to & position the rotating Dog Sub on HRD Setting tool above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack off on string & slam 6Sklbs down weight on ZXP Packer. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L -201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES ~ .. <OéttEf:i:From - To Hours Task Code NPT Phase 4/12/2004 02:30 - 03:30 1.00 CASE P 03:30 - 04:30 1.00 CASE P COMP 04:30 - 07:30 3.00 CASE P CaMP 07:30 - 08:30 1.00 CASE P CaMP 08:30 - 09:00 0.50 CASE P caMP 09:00 - 15:30 6.50 CASE P caMP 15:30 - 17:00 1.50 CASE P COMP 17:00 - 17:30 0.50 CASE P 17:30 - 18:00 O.SO CASE N 18:00 - 20:30 2.50 CASE N 20:30 - 21 :30 21 :30 - 23:00 1.00 CASE N 1.50 CASE N 23:00 - 23:30 0.50 CASE N Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations Printed: 5/312004 8:46:01 AM 8P EXPLORATION ()perf:)~ions ~.u mmªryB~port Page 24 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From ~ To Hours Task CodeNPT Phase ... D~~ºription·. of Qperªtions 4/12/2004 23:00 - 23:30 0.50 CASE N DFAL COMP Repeated this process 5 additional times. NOTE: Top of "L 1" ZXP Packer @ 6319' MDRKB. 23:30 - 00:00 0.50 CASE P COMP Break out TDS. Pull one std of 4" DP & rack in derrick. Blow down TDS & surface equipment. 4/13/2004 00:00 - 01 :30 1.50 CASE P COMP Slip & cut drill line. Reset & check C-O-M. Check drawworks brake system. Service TDS. 01 :30 - 04:30 3.00 CASE P COMP POH (Wet) with 4" DP work string. UD Baker "HRD" Setting Tool. NOTE: The Dog sub was sheared on setting tool but the shear screws on the emergency mechanical release mechanism did not shear. 04:30 - 05:00 0.50 CASE P COMP Clean rig floor of excess MOBM that was generated from Wet Trip. 05:00 - 09:30 4.50 BOPSUP P WEXIT Drain stack & pull wear ring. Hold PJSM. Test BOPE to 250 psi/3500 psi. Lower pneumatic well control valve would not test. Witness of test waived by Jeff Jones - AOGCC. 09:30 - 10:30 1.00 BOPSUP P WEXIT Blow down lines. Install wear ring. 10:30 - 12:30 2.00 BOPSUP P WEXIT PJSM. Change out lower well control valve, pressure test to 250 I 3500 psi. 12:30 - 13:00 0.50 STWHIP P WEXIT Bring Baker whipstock tools to floor. 13:00 - 13:30 0.50 STWHIP P WEXIT PJSM with all personnel on handling and running Baker whipstock. 13:30 - 15:30 2.00 STWHIP P WEXIT M/U whipstock BHA wI 31/2" spaceout and dummy seal assembly hanging below, orient MWD wI whipstock 15:30 - 16:30 1.00 STWHIP P WEXIT RIH wI collars and HWDP, shallow test MWD 16:30 - 20:00 3.50 STWHIP P WEXIT RIH wI whipstock on 4" drillpipe, fill pipe at 4000',6250', 135K UP, 95K DN, no pump 20:00 - 21 :00 1.00 STWHIP P WEXIT Orient whipstock 7 degrees left of high side at 50' above setting depth, slack off and stab dummy seal into tieback sleeve on L-1 at 6319', set down 20K to set whipstock anchor, continue to set down 35K and shear mills off whipstock, test casing to 1500 psi, bled down 70 psi in 7 minutes, 21 :00 - 00:00 3.00 STWHIP P WEXIT Record SPR's. Start intial cut to place Top of Window at 6229' DPM. 130K UP, 93K DN, 105K RT, 3K WOB, 118 SPM, 290 GPM, 1840 PSI, 100 RPM, 6K TO, Mill window to 6237' MN Depth. 4/14/2004 00:00 - 00:30 0.50 STWHIP P WEXIT Mill window from 6237' to 6241', drill new hole from 6241' to 6254' RT WT 105, GPM 290, SPP 1890 psi, RPM 100, TQ 6000 00:30 - 01 :30 1.00 STWHIP P WEXIT Circulate high vis sweep SIS, 295 GPM, 1775 PSI, working string mills 01 :30 - 02:00 0.50 STWHIP P WEXIT Perform FIT test to EMW 12.0 ppg, applied surface pressure 650 psi, mud weight 9.2 ppg MOBM 02:00 - 04:00 2.00 STWHIP P WEXIT Monitor well, pump dry job, POH 04:00 - 05:30 1.50 STWHIP P WEXIT Stand back HWDP, Lay down DC, Lay down milling BHA, string mill in guage at 6.75" 05:30 - 06:00 0.50 STWHIP P WEXIT Clean and clear rig floor 06:00 - 06:30 0.50 STWHIP P WEXIT M/U ported sub, jet BOP stack Recovered a total of 130 Ibs of metal from milling and jetting stack 06:30 - 08:30 2.00 DRILL P WEXIT PJSM wI Anadrill DD I MWD and all rig crew, picking up of BHA # 11 and installing RA source, Printed: 5/312004 8:46:01 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 4/14/2004 08:30 - 11 :30 11 :30 - 12:00 12:00 - 00:00 4/15/2004 00:00 - 12:00 12:00 - 17:00 17:00 - 18:00 18:00 - 00:00 4/16/2004 00:00 - 01 :30 01 :30 - 04:30 04:30 - 05:00 05:00 - 06:00 06:00 - 10:00 10:00 - 13:30 L -201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES :Hours :;;Task Code NPT Phase 3.00 DRILL P 0.50 DRILL P 12.00 DRILL P WEXIT WEXIT PROD3 12.00 DRILL P PROD3 5.00 DRILL P PROD3 1.00 DRILL P PROD3 6.00 DRILL P PROD3 1.50 DRILL P PROD3 3.00 DRILL P PROD3 0.50 DRILL P 1.00 DRILL P 4.00 DRILL N PROD3 PROD3 RREP PROD3 3.50 DRILL P PROD3 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations RIH wI stands to 1172', test MWD, RIH to 6208' Circulate to obtain SPR 1 ECD baseline of 10.56 ppg SIO through TOW at 6229' wI no pump, continue to drill from 6254' to 7607' 123K UP, 80K DN, 99K RT WT, 114 SPM, 280 GPM, 2700 PSI ON 2330 PSI OFF, 65 RPM, 4.5 - 6.5K TO ON, 4.3 TO OFF, 3K - 12K WOB Calculated ECD 10.29 ppg, Actual ECD 10.72 ppg, Backream each stand, Survey every 30', slide as per DD AST 1.88 hrs, ART 2.41 hrs 128K UP, 86K DN, w/ no pumps Directional Drill from 7607' to 9249', 127K UP, 86K DN, 104K RT, 114 SPM, 280 GPM, 2823 PSI ON, 2607 PSI OFF, 65 RPM, 4.5 - 7K TO ON, 4.5K TO OFF, 5- 10 WOB Calculated ECD 10.38 ppg, Actual ECD 10.92 ppg Backream each stand, Survey every 30', slide as per DD. Directional Drill from 9249' to 10,027' 140K UP, 76K DN, 101K RT, 114 SPM, 280 GPM, 3140 PSI ON 2780 PSI OFF, 65 RPM, 8 - 11 TO ON, 7.1 K TO OFF, 5 - 15 WOB Calculated ECD 10.64 ppg, Actual ECD 11.67 ppg Backream each stand, Survey every 30', AST 1 hr, ART 2.36 hrs Circulate bottoms up to lower ECD from 11.67 ppg to 11.23 ppg Add 50 bbls L VT -200 Directional Drill from 10,027' to 10,679' 142K UP, 72K DN, 101 K RT, 114 SPM, 280 GPM, 3140 PSI ON 2860 PSI OFF, 65 RPM, 7 - 8.5K TO ON, 7.6K TO OFF, 5- 10WOB Calculated ECD 10.75 ppg, Actual ECD 11.47 ppg Backream each stand, Survey every 30', slide as per DD AST 1.24 hrs, ART 2.69 hrs Circulate bottoms up twice, Calculated ECD 10.77 ppg, Actual ECD 11.48 ppg, Circulate at 280 GPM, 2850 PSI, 80 RPM, ECD after circulating 11.19 ppg Monitor well, POH 5 stds, pump dry job, intermittent drag 5 - 20K, POH to window, no problems coming thru window, POH to 6208' Rig service, service top drive and crown Slip / cut 52' of drilling line During TD service, found capscrews locating Top Drive brake disc in place on traction motor shaft had sheared off so TD brake is not functioning. Inspect & repair same. Orient MWD high sde, slide past whipstock wI no pump, fill pipe and test MWD at 7000', RIH to 9000', fill pipe, no pump, continue to 10,285', start to wash down, 250 gpm, 50 rpm, Printed: 51312004 8:46:01 AM BP EXPLORATION Op~ratiolJs Summ.~ry Report Page 26 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date Grom-To Hours "Task Code NPT Phase Description ofOperati<?o~ 4/16/2004 10:00 - 13:30 3.50 DRILL P PROD3 2580 psi, 12.0 ECD 13:30 - 14:30 1.00 DRILL P PROD3 At 10,285' circulate bottoms up, drop ECD from 12 to 11.20 ppg, 250 gpm, 2580 psi, 50 rpm 14:30-15:00 0.50 DRILL P PROD3 RIH from 10,285' to 10,585', wash from 10,585' to 10,679' 15:00 - 00:00 9.00 DRILL P PROD3 Dir Drill from 10,679' to 11,436', UP WT 148K, DN WT 56K, RT WT 102K 290 GPM, 3220 PSI ON, 2925 PSI OFF, 8 - 12 TO ON, 8.6 TO OFF, Cal ECD 10.66 ppg, Act ECD 11.38 ppg, 65 RPM, Backream each stand, driil rate up stroke, reduce rate to 250 gpm down stroke Slide as per DD, AST 1.78 hrs, ART 1.24 hrs 4/17/2004 00:00 - 02:00 2.00 DRILL P PRÓD3 Dir Drill from 11,436' to 11,625' 154K UP, 58K DN, 102 RT WT, 118 SPM, 2910 PSI OFF 3290 PSI ON, Cal ECD 10.70, Act ECD 11.31 Backream each stand at drilling rate up, 250 gpm down stroke 02:00 - 03:30 1.50 DRILL N WAIT PROD3 Circulate while wellsite Geologist consults with Anchorage Geology team. 03:30 - 11 :30 8.00 DRILL P PROD3 Dir drill from 11,625' to 12,359' 151K UP, 54K DN, 103K RT WT, 118 SPM, 3000 PSI OFF 3180 PSI ON, 8 - 10K TO ON, 8.4K TO OFF,S - 10K WOB Cal ECD 10.75, Act ECD 11.48, AST 1.8, ART 2.52 Backream each stand at drilling rate up, 250 gpm down stroke 11 :30 - 12:30 1.00 DRILL P PROD3 Circulate to drop ECD from 11.75 to 10.71 ppg 280 GPM, 2936 PSI, 65 RPM 12:30 - 23:00 10.50 DRILL P PROD3 Dir Drill from 12,359' to 13,106' 157K UP, 55K DN, 103K RT WT, 118 SPM, 3014 PSI OFF 3355 PSI ON, 9 - 11 K TO ON, 9K TO OFF,S - 10K WOB Cal ECD 10.41, Act ECD 10.80, AST 2.1, ART 1.75 Backream each stand at drilling rate up, 250 gpm down stroke 23:00 - 00:00 1.00 DRILL P PROD3 Circulate to drop ECD from 10.80 to 10.41 ppg 290 GPM, 3350 PSI, 65 RPM 4/18/2004 00:00 - 00:30 0.50 DRILL P PROD3 Dir Drill, slide from 13,106' to 13,114' 152K UP, 58K DN, 100K RT WT, 114 SPM, 280 GPM 3350 PSI ON, 3010 PSI OFF, 1 - 5K WOB, 10K TO ON, 9K TO OFF, Cal ECD 10.80, Act ECD 11.25 00:30 - 01 :00 0.50 DRILL N DFAL PROD3 Circulate and test mud motor, motor on bottom causes pressure spike. Unable to operate motor within limits (acts as if pumping thru a stalled motor). Geologist consults Anchorage and they are prepared to call this TD for lateral L2. 01 :00 - 03:30 2.50 DRILL N DFAL PROD3 Circulate to drop ECD from 11.25 to 11.10 actual, calculated 10.80 ppg for wiper trip. 03:30 - 08:00 4.50 DRILL N DFAL PROD3 Wiper trip to window, flow check, pull 5 stands, flow check, pump slug, Minor drag at 12710' & 11120' (15 klbs over normal drag). Drop back down thru same and come back thru - OK. Continue up inside window without further tight spots or problems. 08:00 - 08:30 0.50 DRILL P PROD3 Service top drive. 08:30 - 09:30 1.00 DRILL N DFAL PROD3 Attempt to break circ to orient for exiting window. Circ pressure 4000 psi @ 200 gpm. Discuss with Anch DE and agree to POH for new motor. Drop circ sub ball and open same. Circ casing clean at 450 gpm @ 1900 psi. Monitor well & pump dry job. Printed: 5/312004 8:46:01 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES From - To Hours. Task Code NPT Phase 4/18/2004 09:30 - 12:30 3.00 DRILL N DFAL PROD3 12:30 - 14:00 1.50 DRILL N DFAL PROD3 14:00 - 14:30 0.50 DRILL N DFAL PROD3 14:30 - 15:00 0.50 DRILL N DFAL PROD3 15:00 - 17:00 2.00 DRILL N DFAL PROD3 17:00 - 22:30 5.50 DRILL N DFAL PROD3 22:30 - 00:00 1.50 DRILL N DFAL PROD3 4/19/2004 00:00 - 04:30 4.50 DRILL P PROD3 04:30 - 08:00 3.50 DRILL P PROD3 08:00 - 16:00 8.00 DRILL P PROD3 16:00 - 17:00 17:00 - 17:30 17:30 - 18:00 18:00 - 19:30 19:30 - 21 :00 21 :00 - 22:30 22:30 - 23:00 1.00 DRILL P 0.50 DRILL P 0.50 RUNCO~ 1.50 RUNCO~ 1.50 RUNCO~ 1.50 RUNCO~ 0.50 RUNCO~ PROD3 PROD3 COMP COMP COMP COMP COMP 23:00 - 23:30 0.50 RUNCO~ COMP 23:30 - 00:00 0.50 RUNCO~ COMP 4/20/2004 00:00 - 04:00 4.00 RUNCOf\fP COMP 04:00 - 05:30 1.50 RUNCOf\fP COMP 05:30 - 06:30 1.00 RUNCO~ COMP 06:30 - 07:30 1.00 RUNCOf\fP COMP 07:30 - 16:00 8.50 RUNCOf\fP COMP Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 . ,.:::..:.-'," . ,'" " .' :,"'";-",,.::,,-, .... "., "";'-'".",.._"",." ",.", .. .,..' ,""'.',''':'''' .."'''. ,"'" """"," ." . . '." ""','."',', ,"'" DescriptiorlofOperatiohs· POH for motor changeout. Will go back in with new 1.15 deg AIM motor and no Neutron/Density tool to drill remaining 400' of hole as agreed by Anch Geology and ODE. PJSM, w/ MWD, DD, rig crew on handling of source, handling BHA, change out motor, bearing pack gone Clear and clean rig floor Down load MWD and LWD, up load VPWD Make up bit # 9, run BHA # 12 RIH to 1500', shallow test MWD, RIH to 6229', orient 7 left of highside, slide through window, RIH to 10,000', fill drillstring, RIH to 10,935', taking weight approx 25k, to 110988' and again at 11680'. Wash from 13,010' to bottom. Estimate losing approx 75 bbl mud to formation during trip. Circulate to lower initial ECD on bottom of 12.14 to 10.81 ppg 213 GPM, 2058 PSI Directional drill from 13,114' to 13,490', TD for lateral # 3 157KUP, 56KDN, 99KRT, 10-15KWOB, 118SPM, 290 GPM 2920 PSI OFF, 3150 PSI ON, 10K TQ ON, 9K TQ OFF Circulate throughout to keep calculated ECD at 10.81 ppg, actual 11.41 ppg. Mud seepage loss to well at 1-2 bph. Circulate to lower actual ECD from 11.41 ppg to 11.08 ppg for trip out. Calculated ECD 10.88 ppg plus 0.2 = 11.08 ppg. Current ECD = 11.01 ppg. Moniter well, pump dry job, POH, intermitten overpull of 5 - 15K, record up / dn WT every 5 stands in open hole, every 10 stands in casing Lay down directional drilling BHA # 12 Clean and clear rig floor Pick up I make up whipstock retrieving BHA Pick up / make up 24 x 4 3/4" DCs from pipe shed 1 x 1 Trip in to 6167' wI drillpipe Rig service, service top drive / crown Orient 7 left high side, slide hook down to 6235', work down, latched in on second attempt, pick up to 175K and set jars off, pick up to 200K and set off jars, pick up to 21 OK, whipstock free, trip to 6200', UP WT 140K, DN WT 95K Circulate bottoms up, 275 GPM, 1750 PSI, losses of 17 bbls downhole in first 10 minutes of circulating, monitor wellbore, pump dry job Trip out with whipstock and assembly, UP WT 150K Trip out slowly with whipstock Lay down whipstock retrieving BHA, lay down whipstock and tail space out tubulars. Clean and clear rig floor Rig up to run 41/2" L-80 slotted liner PJSM, RIH wI slotted liner, make up to mark, 2300 ft Ibs torque, use BOL 2000 NM dope, run at 90 seconds per joint in casing, RIH to middle of window at 6235', RIH with joint # 152, 10' down taking wt at 6330', POH to middle of window, turn pipe 1/4 tum work tq down, RIH to 6330' taking wt, POH to Printed: 51312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date BP EXPLORATION Operati9I1S$lJmrnªry.· Report L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 4/20/2004 07:30 - 16:00 From - To Hours Tfj.sk Code NPT 0esçriptionof ()p~rp.!i<:)P:3 16:00 - 21 :30 21 :30 - 23:00 23:00 - 00:00 8.50 RUNCOrvP CaMP 5.50 RUNCOrvP COMP 1.50 RUNCOrvP COMP 1.00 RUNCOtvP COMP 4/21/2004 00:00 - 00:30 0.50 RUNCOrvP COMP 00:30 - 05:00 4.50 RUNCOrvP COMP 05:00 - 06:00 1.00 RUNCOrvP COMP 06:00- 06:30 0.50 RUNCOrvP COMP 06:30 - 07:30 1.00 RUNCOrvP COMP 07:30 - 11 :30 4.00 RUNCOf\,p COMP 11:30-12:00 0.50 RUNCOrvP COMP 12:00 - 13:30 1.50 RUNCOrvP COMP 13:30 - 15:00 1.50 RUNCOrvP COMP 15:00 - 17:00 2.00 RUNCOrvP CaMP 17:00 - 18:00 1.00 RUNCOrvP CaMP 18:00 - 19:00 19:00 - 19:30 19:30 - 20:30 1.00 RUNCOrvP COMP 0.50 RUNCOrvP COMP 1.00 RUNCOrvP CaMP 6235', turn 1/4 turn, bent jt through window on 4 th attempt, liner in open hole, run speed 60' per minute, make up hook hanger, 100K UP WT, 70K DN WT, ran total of 171 jts of 4 1/2" liner Change out casing equipment, rig to run stands from derrick, RIH to 13,458', 190K UP WT, 55K DN WT RIH to 10' past hook hanger at 13,458', turn pipe 1/4 turn, work tq in pipe, work down past window, turn pipe 1/4 turn, work tq down, work past window, failed at 2 more attempts, turn pipe 1/8 turn, work tq down, work hook past window, continue turning 1/8 turn and working past pipe down window. 200K UP WT, 50K DN WT Land Hook hanger, drop 29/32" ball, pump first 30 bbls at 4 bpm, 636 psi, reduce to 2 bpm, 175 psi for 15 bbls, pump 1 bbl to seat, pressure to 3000 psi, release HR tool, free pick up wt 140K, lost 60K, pressure up and shear ball seat at 4400 psi Circulate bottoms up at 375 gpm, 2290 psi, with pumps off tag up, top of hook hanger at 6224', 11.5' up on stand 51, monitor wellbore, pump dry job Trip out, lay down 12 x 43/4" DCs, Lay down Baker liner running tools Clean and clear rig floor Drain BOP stack, pull wear bushing, install test plug PJSM, PT BOP and all related equipment to 250 psi low, 3500 psi high Perform D4 accumulator function test Witnessing waived by Lou Gramaldi AOGCC Pull test plug, install wear bushing Rig service, service top drive Rig up, pick up, make up LEM # 2 assembly, make up to mark 3200 ft Ibs, use BOL 2000 dope, make up seal bore assembly to 4600 ft Ibs RIH slow on DCs, mud overflowing pick up subs, make up top drive to HWDP RIH through hook hanger at 6224', slide through no problems 135K UP WT, 95K DN WT Appear to have tagged up 13' higher, ( collar from LEM hanging up in hook hanger?) gives appearance of positive orientation and collet latch in hook hanger, two attempts, third attempt turn LEM 1/2 turn, work down to proper depth of 6345' Drop ball, pump 4 bpm at 713 psi for 30 bbls, pump 2 bpm at 236 psi for 11 bbls, pump 1 bpm at 100 psi until ball seated, pressure up to 4000 psi to set ZXP packer, pick up to 135K UP WT, pick up 10' to release rotating dogs, rotate setting dogs at 20 rpm, to verify packer set, pressure test annulus to 1500 psi for 10 minutes, charted, top of ZXP packer at 6173.40 ' PJSM with BAKER rep and rig crew, pressure up to 3000 psi with rig pump, pressure up to 5200 psi with test pump, blow ball seat Circulate bottoms up at 114 spm, 1217 psi, monitor wellbore, pump dry job Printed: 5/3/2004 8:46:01 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 WEXIT Mill window from 6031 to 6050', TOW 6025', BOW 6037', open hole from 6037' to 6050' 7 -10K WOB, 135K UP WT, 90K DN WT, 107K RT WT, 290 GPM, 1798 PSI, 100 RPM, 8 - 9 TO Circulate 50 bbl high vis pill, 60% increase in cuttings when pill at shaker FIT test to 12 ppg mud, applied surface pressure 650 psi, mud weight 9.3 ppg, TVD 4440', pressure bled down from 650 psi to 600 psi in 7 minutes, then held steady Monitor well bore, pump dry job, trip out with mill BHA Stand back HWDP, lay down DCs, lay down milling BHA, mills in guage Clean and clear rig floor Flush stack with ported sub PJSM, PU, MU, bit # 4, BHA # 13 PJSM, load source in directional BHA RIH with BHA, shallow test MWD at 1500' RIH to 5932', fill pipe Rig service, slip and cut drilling line Rig service, service top drive, crown Break circulation, orient to 10 degree left of high side, obtain baseline ECD mud weight 9.2 ppg, ECD 10.03 ppg Directional drill from 6050' to 6773' 116K UP WT, 82K DN WT, 105K RTWT, SPM 113, GPM 280, RPM 40 TO ON 5.3, TO OFF 3.5, Gal ECD 10.13, Act ECD 10.46 Date FrQm-To HOlJrs Tªsk Gode:·NP:[ . 4/21/2004 20:30 - 00:00 3.50 RUNCOWN DFAL CaMP 4/22/2004 00:00 - 03:00 3.00 RUNCOrvP CaMP 03:00 - 03:30 0.50 RUNCOfvP COMP 03:30 - 04:30 1.00 STWHIP N DFAL WEXIT 04:30 - 13:00 8.50 STWHIP N DFAL WEXIT 13:00 - 14:30 1.50 STWHIP N DFAL WEXIT 14:30 - 15:00 0.50 STWHIP P WEXIT 15:00 - 15:30 0.50 STWHIP P WEXIT 15:30 - 17:00 1.50 WHIP P WEXIT 17:00 - 18:00 1.00 WHIP P WEXIT 18:00 - 20:30 2.50 WHIP P WEXIT 20:30 - 21 :00 0.50 WHIP P WEXIT 21 :00 - 21 :30 0.50 WHIP P WEXIT 21 :30·00:00 2.50 STWHIP P WEXIT 4/23/2004 00:00 - 02:00 2.00 STWHIP P 02:00 - 02:30 0.50 STWHIP P WEXIT 02:30 - 03:00 0.50 STWHIP P WEXIT 03:00 - 05:00 2.00 STWHIP P WEXIT 05:00 - 07:00 2.00 STWHIP P WEXIT 07:00 - 07:30 0.50 STWHIP P WEXIT 07:30 - 08:00 0.50 STWHIP P WEXIT 08:00 - 09:00 1.00 DRILL P WEXIT 09:00 - 09:30 0.50 DRILL P WEXIT 09:30 - 10:00 0.50 DRILL P WEXIT 10:00 - 12:00 2.00 DRILL P WEXIT 12:00 - 13:00 1.00 DRILL P WEXIT 13:00 - 14:00 1.00 DRILL P WEXIT 14:00 - 14:30 0.50 DRILL P WEXIT 14:30 - 00:00 9.50 DRILL P PROD4 ..,' ,,',', ,', ,.. .,', ...', ":'", ,: ',,', '.'."",'.;' " . '"'''',''' ,', ,',' '.' ','.",',' ." ,"',",',.'"',',,,',', ",',','",..,,','.,',",,',',',,'""'.,'"."."'.",,,',',,"'.,""'" """"'"',,;,..,, , .' ,., ,""" , ., ...."..-,....", .,. De&9Eipt!pr1ofGperatiøns ",' . POH, lay down 192 jts DP to pipe shed, 133K UP WT, 95K DNWT Trip out laying down drill pipe and HWDP for hard banding wear. Lay down LEM running tools Trip in 10 stands drillpipe from derrick, lay down same for hard banding wear Pick up, make up, trip in drillpipe 1 x 1 to replace layed out drillpipe Trip out racking back 42 stands of drill pipe Clear and clean rig floor Rig service, service top drive and crown PJSM, Baker rep and rig crew, p/u, mlu, seal and whipstock assembly, orient same RIH with DCs and HWDP, 90 seconds per stand RIH with drillpipe at 90 seconds per stand Orient whipstock at 14 degrees left of high side, set anchor with 15K down at 6185', pick up to 145K, slack off to 35K, shear starting mill off whipstock at 42K Pressure test casing to 1500 psi for 5 minutes, circulate and record SPRs Begin milling at 6025', TOW, to 6031' 7K WOB, 135K UP WT, 90K DN WT, 107K RT WT, 290 GPM, 1798 PSI, 100 RPM, 7 - 8 TO Adding 200 bbls of new 9.2 ppg MOBM to active system while milling Printed: 5/312004 8:46:01 AM BP EXPLORATION OperatioflSSU r11r11ªry . Report Page 30 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From- To Hours Task Code NPT Phase Description. of Operations 4/24/2004 00:00 - 03:00 3.00 DRILL P PROD4 Directional drill from 6773' to 7147' 114 SPM, 290 GPM, 40 RPM, 9 - 11 TO ON, 8.7 TO OFF, 03:00 - 04:00 1.00 DRILL N DFAL PROD4 Problems with MWD survey accuracy, a large difference from surveys and corrected surveys, roll test MWD, talk with Anadrill directional engineer about survey accuracy, decision to drill ahead 04:00 - 12:00 8.00 DRILL P PROD4 Directional drill from 7147' to 7981' 113 SPM, 276 GPM, 2500 PSi, 40 RPM, 10 - 11 TO ON, 8.9 TO OFF, Cal ECD 10.26, Act ECD 10.95, AST 1.24, A TR 3.02 12:00 - 17:00 5.00 DRILL P PROD4 Directional drill from 7981' to 8630; 113 SPM, 273 GPM, 2540 PSI, 80 RPM, 6 TO ON, 5.5 TO OFF, Cal ECD 10.42, Act ECD 11.17 17:00 - 18:30 1.50 DRILL P PROD4 Circulate to lower ECD from 0.8 over to 0.6 over calculated ECD of 10.42 18:30 - 00:00 5.50 DRILL P PROD4 Directional drill from 8630' to 8848' 113 SPM, 273 GPM, 2510 PSI, 40 RPM, 6TOON,5TO OFF, Cal ECD 10.42, Act ECD 10.52 126K UP, 82K ON, 104K RT WT AST 2.72, ART 0.16 4/25/2004 00:00 - 02:30 2.50 DRILL P PROD4 Directional drill from 8848' to 8978' 127K UP, 83K ON, 104K RT WT, 6 TO ON, 5 TO OFF 113 SPM, 273 GPM, 5 - 20 WOB, 2520 PSI ON, 2430 PSI OFF, AST 2.9, ART 1.1 02:30 - 03:00 0.50 DRILL P PROD4 At 8978' wellbore crossed fault, consult with Anchorage geology team, decision to steer wellbore up to locate shales for drilling TVD 03:00 - 05:30 2.50 DRILL C PROD4 Directional drill from 8978' to 9378', Steer well bore to 99 degrees high side, rotate out, drill ahead as per geology instructions, 05:30 - 13:30 8.00 DRILL C PROD4 Circulate wellbore, consult with Anchorage geology team: Did not intend to cross 50' throw fault in this location in the polygon. Had to discuss polygon development options prior to proceeding. 13:30 - 14:30 1.00 DRILL C PROD4 Trip out from 9378' to 8715', 150K UP, 73K DN 14:30 - 15:00 0.50 DRILL C PROD4 Start trenching from 8715' to 8733', 160 degree left, 113 SPM, 280 GPM, 2440 PSI 15:00 - 00:00 9.00 DRILL C PROD4 Directional drill from 8733' to 9191', 113 SPM, 280 GPM, 2620 PSI ON, 2560 PSI OFF, 40 RPM 144K UP, 69K DN, 101 RT, Cal ECD 10.66, Act ECD 11.15, AST 4.17, ART 0.13 4/26/2004 00:00 - 02:30 2.50 DRILL C PROD4 Directional drill from 9191' to 9378' MD as per new geological prognosis. 02:30 - 04:00 1.50 DRILL P PROD4 Directional drill from 9378' to 9486' 2720 PSI ON, 2540 PSI OFF, 6.7 TO ON, 6.1 TO OFF, 5- 8K WOB 142K UP, 82K DN, 100K RT, Cal ECD 10.83, Act ECD 11.22 04:00 - 05:00 1.00 DRILL P PROD4 Circulate wellbore, consult with Anchorage geology team 05:00 - 09:00 4.00 DRILL P PROD4 Directional drill from 9486' to 9860' TD for L3 Printed: 5/312004 8:46:01 AM ) ) BP>EXPl20ffiATION Qp~rø~iºn!; S~mmary Report Circulate at 280 gpm, with 100 RPM for max well bore cleaning, calculated ECD 10.87, drop actual ECD to 11.17, 0.3 ppg over calculated Wiper trip, monitor well bore, pull 5 stands, pump dry job, 143k UP, 84K DN, trip to window, pull15K over at 8940,8845, 8225, 8585, wipe clean, ok, pull 20K over at 8758, 8565, pump 125 GPM with 40 RPM, wipe clean, ok Rig service, service top drive Orient high side, slide through window with no pump, trip in to 8680', orient 145 left, slide through open hole side track, trip in to 9845', pick up single and wash to bottom at 9860' Circulate to lower ECD and clean wellbore, drop actual ecd from 11.87 to 11.05, 0.2 over calculated of 10.89 ppg 113 SPM, 280 GPM, 2610 PSI, 100 RPM, Trip out, monitor well bore, pull 5 stands, 143K UP, 84K DN, pump dry job, trip out Trip out of we II bore to place circulating sub at window, well bore in good condition, no wiping during trip Orient to 14 deg LHS. Drop Circ-Sub opening ball, Pump at 450 GPM, 2320 PSI, wash whipstock twice, 50 % increase in cuttings at shakers during first bottoms up, 4 bottoms up to clean casing, Flow check. Well static. Pump slug. Continue POOH to top of BHA. SAFETY--- Held PJSM with rig crew & Anadrill personnel regarding removing the RA Source & UD BHA. Remove RA Source. UD all Anadrill Directional tools & bit. Clear & clean rig floor. SAFETY--- Held PJSM with rig crew, Anadrill & Baker personnel regarding M/U Whipstock retrieving tool (WSRT) & BHA. M/U WSRT & BHA which consists of the following: Whipstock Hook retrieving tool + 1 Jt of 3.5" HWDP + FS + MWD + Bumper-Sub + Oil Jar + 12 x 4-3/4" DC + XO + 24 x 4" HWDP = 1199.63'. Shallow test MWD-OK. COMP TIH with WSRT BHA on 4" DP to 5975'. COMP M/U TDS. Break circulation. Stage pumps to 280 gpm w/1675 psi. Orient WSRT to 14 deg LHS. (P/U Wt 130k S/O Wt 94k). Slack off on drill string to 6030'. P/U & engage whipstock. Pull on whipstock with 60k overpull, no release. Jar on whipstock 1 time with 95k over pull & release whipstock. P/U & pull seals out of L2 tie-back receptacle. Pull whipstock up to 6000' (P/U Wt = 136k). Monitor well 5 minutes. Annulus level fell +/- 30'. Fill hole with 8 bbl of mud. COMP POOH 5 stds. Pump slug. Continue POOH with whipstock assembly #3 to top of BHA. COMP Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock retrieving tool, L3 Whipstock & 3.5" DP space-out assembly. 100% recovery of all Whipstock & downhole tools. Clear & clean rig floor. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES From - To. Hours Task Code NPT Phase 4/26/2004 05:00 - 09:00 4.00 DRILL P PROD4 09:00 - 12:30 3.50 DRILL P PROD4 12:30 - 17:00 4.50 DRILL P PROD4 17:00 - 17:30 0.50 DRILL P PROD4 17:30 - 20:30 3.00 DRILL P PROD4 20:30 - 22:30 2.00 DRILL P PROD4 22:30 - 00:00 1.50 DRILL P PROD4 4/27/2004 00:00 - 02:00 2.00 DRILL P PROD4 02:00 . 03:30 1.50 DRILL P PROD4 03:30 - 04:00 0.50 DRILL P PROD4 04:00 - 06:00 2.00 DRILL P PROD4 06:00 - 06:30 0.50 DRILL P PROD4 06:30 - 08:00 1.50 DRILL P PROD4 08:00 - 08:30 0.50 DRILL P PROD4 08:30 - 09:00 0.50 STWHIP P COMP 09:00 - 10:30 1.50 STWHIP P COMP 10:30 - 13:00 13:00 - 13:30 2.50 STWHIP P 0.50 STWHIP P 13:30 - 17:00 3.50 STWHIP P 17:00 -19:30 2.50 STWHIP P Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 . De~cription of Operations 7.5 TO ON, 7.0 TO OFF, 5 - 10K WOB, Cal ECD 10.90, Act ECD 11.43 Printed: 5/312004 8:46:01 AM BP EXPLORATION OperatiQnsSummary,Report Page 320134 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours ····rask Code NPT Phase Qe~cription. ofÇ?perations 4/27/2004 19:30 - 20:30 1.00 CASE P COMP Rig up Hydraulic Casing Tongs & related equipment to run 4.5" Slotted Production Liner. 20:30 - 21:45 1.25 CASE P COMP SAFETY --- Held PJSM with rig crew & Baker Service Reps on running 4.5" Liner & M/U Hook-Hanger assembly. 21 :45 - 00:00 2.25 CASE P COMP M/U 4-1/2" Float Shoe (Bent) Jt + 87 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner to 3672'. MIU Torque = 3200 FtLb 4/28/2004 00:00 - 00:30 0.50 CASE P COMP Finish M/U 4-1/2" Float Shoe (Bent) Jt + 89 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner + 1 Jt of solid liner + XO Pup Jt & BOT Flanged Hook Hanger assembly. Total length = 3825.29' M/U Torque = 3200 FtLb P/U Wt = 72k --S/O Wt = 60k-- Theoretical Liner Wt in mud = 41,500 Lbs 00:30 - 01 :00 0.50 CASE P COMP Change elevators to fit 4" DP. RID Hydraulic Casing Tongs & related equipment. 01:00 - 02:15 1.25 CASE P COMP Continue RIH with 4-1/2" slotted liner on 25 Stds of 4" DP. Tag up @ 6184' on L2 LTP. P/U 105k S/O 80k 02: 15 - 02:45 0.50 CASE P COMP POOH to 6020'. Apply 1/4 RH turn in string. Reciprocate string to relax torque. TIH with the 4-1/2" slotted liner. Tag up @ 6184'. POOH to 6020'. Apply another 1/4 turn. TIH successfully entering the L3 lateral @ 6037". 02:45 - 04:45 2.00 CASE P COMP Continue TIH. Tag up @ 9380' indicating that the 4.5" Liner did not enter the open hole sidetrack in the L31ateral @ 8715'. Original hole hole depth 9378'. 04:45 - 06:30 1.75 CASE P COMP POOH to 8700'. Apply 1/2 turn to right while pick up. TIH successfully entering the open hole sidetrack in the L3 lateral @ 8715'. Conitinue TIH to 9845'. Engage hook hanger on bottom of window @ 6037' on first attempt. 06:30 - 08:00 1.50 CASE P COMP PU 10' above window and rotate string 112 turn. Slack-off and run Hook-Hanger 10' below btm of window - OK. P/U string with Hook-Hanger 10' above window. Re-orient hook hanger and Land out with Hook-Hanger on bottom of window @ 6037-0K. P/U Wt = 150k SIO Wt = 85k, Set down 20k on top of hanger. Shoe at 9845'. Top of hook hanger at 6020'. Drop 29/32" ball & pump on seat. Pressure up to 3000 psi to release HWH Running tool. P/U Drill string 10' & verify HWH Running tool released. Lost 37k string wt. Set back down & tag Hook-Hanger with 25k-0K. P/U on string with Running Tool above Hook-Hanger. RlU Side Entry Pump-in sub into the 4" DP. Pressure up to 4900 psi & blow ball seat. RID pump-in sub. M/U TDS. 08:00 - 09:30 1.50 CASE P COMP P/U on string placing end of DP @ 6000'. CBU @ 6 bpm wI 1100 psi. Flow check. Pump slug. 09:30 - 12:30 3.00 CASE P COMP POOH with 4" DP. UD Baker's Liner Running Tool. 12:30 - 13:00 0.50 CASE P COMP RlU Handling tools for LEM. 13:00 - 13:30 0.50 CASE P COMP SAFETY--- Held PJSM with rig crew & Baker on picking up & running LEM assembly. 13:30 - 18:30 5.00 CASE P COMP P/U ZXP Packer/LEM assembly. TIH with same on 4" DP to 6006'. P/U 134k SIO 93k Printed: 5/312004 8:46:01 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES .·..,:~~te E~pm7m9 Hours Jask . ,Code,: <NPT.Phªs,ø 4/28/2004 18:30 - 20:00 1.50 CASE P COMP 20:00 - 20:30 0.50 CASE P COMP 20:30 - 21 :00 0.50 CASE P COMP 21 :00 - 23:00 2.00 CASE P COMP 23:00 - 00:00 1.00 CASE P COMP 4/29/2004 00:00 - 01 :00 1.00 CASE P COMP 01 :00 - 01 :30 0.50 CASE P COMP 01 :30 - 06:30 5.00 CASE P COMP 06:30 - 08:30 2.00 CASE P CaMP 08:30 - 14:00 5.50 CASE P COMP 14:00 - 14:30 0.50 WHSUR P COMP 14:30 - 16:00 1.50 WHSUR P COMP 16:00 - 16:30 0.50 RUNCOtvP COMP 16:30 - 00:00 7.50 RUNCOtvP COMP 4/30/2004 00:00 - 03:00 3.00 RUNCOtvP COMP Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Continue RIH. Sting seal assembly into Seal Bore Extension @ 6196' & Land LEM in Hook-Hanger @ 6020'. PIU 10k over string weight to verify LEM engaged-OK. Drop the 29/32" setting ball and pump on seat @ 164 gpm wI 680 psi. Pressure up to 2500 psi, wait 2 minutes, then increased pressure to 4000. P/U on string. Packer Setting tool free. P/U 10' & position the rotating Dog Sub above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack off on string & set down 50klbs on ZXP Packer. P/U 15'. R/U & blow ball seat with 5075 psi. NOTE: Top of "L3" ZXP Packer @ 5981' MDRKB. P/U on string & place LEM Running tool @ 5980'. CBU with 346 GPM @ 1760 PSI. Displace well to 9.3 ppg brine from 5980'. Pumped the following sweeps: 25 bbls L VT -200 base oil 25 bbls viscosified 9.3 ppg brine 50 bbls 9.3 ppg brine with 4 drums Safe Surf 0 25 bbls viscosified 9.3 ppg brine Follow the sweeps with 290 bbls 9.3 ppg brine until clean returns. 430 gpm, 2025 psi. Note: 170 bbls Versacoat left in hole. Load MOBM on trucks. Clean MOBM from rotary table, sumps, shakers, pits & mud return line. Finish cleaning pits & surface equipment of MOBM. Service TDS. POOH. Lay down 150 Jts of 4" DP + 12 x 4.75" DC & BOT LEM Running Tool. TIH with 8 Std of 4" HWDP + 50 Std of 4" DP from derrick to 5407' POOH. UD 150 Jts of 4" DP + 24 Jts of 4" HWDP. Clear rig floor of excess drilling equipment. Flush BOP Stack. Pull wear bushing. R/U 4.5" tbg running equipment. R/U control line spool & hang sheave for running I-wire. P/U tbg hanger & make dummy run. UD same. SAFETY--- Held PJSM with BOT, Centrilift, Cameo, Nabors Casing and all rig personnel on making up and running completion string. Run 75 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with jewelry as per running orders. M/U and run I-wire for Phoenix pressure sensor. Check sensor and I-wire every 1000' of tbg run. Install 1 control line clamp per tbg joint for the 1 st 10 joints, then 1 clamp every 2 joints. Midnight depth = 3361'. Finish running 4.5- Production String from 3361'. Ran a total of 136 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with jewelry as per running orders. Check sensor and I-wire every 1000'. Install 1 control line clamp per tbg joint for the 1 st 10 joints, then 1 clamp every 2 joints to surface - 75 total clamps run. Printed: 51312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page.34 of 34 BP EXPLORATION Op~ra~ions~ummary aeport L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours . Task Code NPI Phase 4/30/2004 03:00 - 05:00 2.00 RUNCOtvP COMP 05:00 - 07:00 07:00 - 09:00 2.00 RUNCOtvP COMP 2.00 RUNCOtvP COMP 09:00 - 09:30 0.50 RUNCOtvP COMP 09:30 - 12:00 2.50 BOPSUP P COMP 12:00 - 15:00 3.00 WHSUR P COMP 15:00 - 16:00 1.00 WHSUR P COMP 16:00 - 19:30 3.50 WHSUR P COMP 19:30 - 20:00 20:00 - 21 :00 21 :00 - 22:00 0.50 WHSUR P COMP 1.00 WHSUR P 1.00 WHSUR P COMP COMP Description of Operations Tag up on NO-GO @ 6001'. M/U space out pups. Run I-wire through hanger & secure. Shell test Tubing Hanger to 5000 psi-OK. Land Tubing Hanger in wellhead. Space out tbg 2' above NO-GO placing the mule shoe at 5999'. RILDS and test I-wire-OK. Reverse circulate 94 bbls clean brine followed by 3 bbls corrosion inhibited brine, followed by 158 bbls clean brine. Placing corrosion inhibited brine between packer and lower GLM. 3 bpm @ 150 psi. Drop 1-7/8" ball-rod & let gravitate on seat. Pressure up tubing to 4500 psi to set packer. Bleed pressure to 3500 psi and hold for 30 minutes for tbg test. Bleed tbg pressure to 2500 psi and pressure up annulus to 3500 psi, hold for 30 minute for annular and packer test. Bleed both tbg and annulus pressure to 0 psi. Pressure up annulus, DCK valve sheared at 3000 psi. Circulate through the tubing to ensure DCK was open. UD 4.5" tubing landing joint. Install TWCV. UD Mouse Hole, pull Bell-nipple. NID BOP. N/U FMC 11" 5K x 4-1/16" 5K Tubing head adapter. Terminate I-Wire through adapter flange. N/U 4-1/16" 5K Production Tree. Test tubing head adapter & tree to 5000 psi. Test was API. R/U DSM lubricator. Pull TWCV. Held PJSM with Rig Crew & Little Red Hot Oil Service rep regarding freeze protecting operations. R/U Hot Oil & test lines to 2000 psi. Freeze protect 4.5" x 7 5/8" annulus. Reverse circulate 150 bbl of diesel down 4.5" x 7 5/8" annulus @ 2 bpm with 1250 psi. Let well U-Tube & equalize. DSM install BPV in Tubing Hanger. Test to 1000 psi form below. RID Hot Oil Line. DSM install VR Plugs in Tubing Spool outlets. Install needle valves & gauges on wellhead wing valve outlets. Secure well. Clean up cellar area. Release Rig @ 22:00 Hrs April 30, 2004 Printed: 5/312004 8:46:01 AM ) ) bp to L-201 L 1 Survey Report Schlumberger Report Date: 11-Apr-04 Survey / DLS Computation Method: Minimum Curvature 1 Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 130.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0,000 ft, E 0,000 ft Structure / Slot: L-PAD / N-U TVD Reference Datum: Rotary Table Well: L-201 TVD Reference Elevation: 78,70 ft relative to MSL Borehole: L-201L 1 Sea Bed / Ground Level Elevation: 50,20 ft relative to MSL UWI/API#: 500292320260 Magnetic Declination: 25,005° Survey Name / Date: L-201 L 11 April 11 , 2004 Total Field Strength: 57560,957 nT Tort / AHD I DDI/ ERD ratio: 503,135° 111203.85 ft 17,214/2.402 Magnetic Dip: 80,823° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 08, 2004 Location Lat/Long: N 70,35073717, W 149,32347531 Magnetic Declination Model: BGGM 2003 Location Grid N/E YIX: N 5978320,840 ftUS, E 583325.340 ftUS North Reference: True North Grid Convergence Angle: +0.63713312° Total Corr Mag North -> True North: +25.005° Grid Scale Factor: 0,99990789 Local Coordinates Referenced To: Well Head Measured Inclination AzImuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Departure (ft ) (deg) ( deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/100 ft ) (ftUS) (ftUS) 0.00 0.00 0.00 -78.70 0,00 0,00 0.00 0,00 0,00 0,00 0,00 0,00 5978320.84 583325,34 N 70,35073717 W 149,32347531 124,00 0,22 237.38 45.30 124.00 -0,07 0,24 -0,13 -0,20 0,18 0.18 0,00 5978320,71 583325,14 N 70,35073682 W 149.32347694 224.00 0,52 340,14 145,30 224,00 -0,52 0,75 0.19 -0.52 0,61 0,30 102,76 5978321.03 583324,82 N 70.35073770 W 149,32347951 324.00 2.13 19.40 245.27 323,97 -1,57 3,00 2.37 -0.05 1,76 1,61 39.26 5978323,21 583325,26 N 70.35074366 W 149,32347575 395,00 4,15 21.01 316.16 394.86 -2,87 6,89 6,02 1,31 2,85 2,85 2,27 5978326.87 583326,58 N 70,35075361 W 149,32346471 495.00 5.88 17.19 415,77 494.47 -6,03 15,63 14.29 4.12 1,76 1,73 -3.82 5978335,17 583329.30 N 70.35077621 W 149,32344189 595.00 8.86 11.46 514,94 593,64 -11.70 28.45 26.73 7,16 3,07 2,98 -5,73 5978347,65 583332,20 N 70,35081020 W 149,32341717 695,00 11.87 12.48 613,29 691,99 -20,13 46.44 44,33 10,92 3,02 3.01 1,02 5978365.28 583335,76 N 70.35085827 W 149.32338670 758.99 14.48 14,62 675,59 754,29 -26,60 61,02 58.50 14.36 4.15 4,08 3.34 5978379.49 583339.05 N 70.35089697 W 149,32335876 853,05 17.37 16.52 766,04 844.74 -37,24 86.82 83,34 21,32 3,12 3,07 2,02 5978404.41 583345,73 N 70,35096485 W 149,32330224 947.46 19,62 16,37 855.56 934,26 -49,21 116,77 112.06 29.80 2,38 2,38 -0,16 5978433,22 583353.88 N 70,35104332 W 149,32323343 1040,82 22.84 16.89 942,58 1021,28 -62,61 150,57 144.45 39.48 3.45 3.45 0,56 5978465,71 583363,21 N 70,35113179 W 149,32315481 1132.91 25.75 16,87 1026,50 1105,20 -77.48 188.45 180.70 50.48 3.16 3.16 -0,02 5978502.07 583373,80 N 70.35123083 W 149.32306550 1226,13 27,99 17.46 1109.65 1188,35 -93,82 230,58 220,95 62,92 2.42 2.40 0,63 5978542.46 583385.79 N 70,35134079 W 149,32296450 1321.50 29.42 18,07 1193,30 1272.00 -111,15 276.39 264,57 76,90 1,53 1.50 0,64 5978586,22 583399,29 N 70,35145995 W 149,32285099 1416,81 31.11 18,21 1275.62 1354,32 -129,04 324.42 310.22 91,86 1,77 1,77 0.15 5978632.03 583413.74 N 70,35158465 W 149,32272956 1511,08 32.79 18,97 1355,60 1434,30 -147,24 374,31 357.49 107.77 1,83 1,78 0,81 5978679.48 583429,12 N 70,35171381 W 149,32260040 1604,81 34,13 19,21 1433,80 1512.50 -165.68 425,98 406.33 124.67 1.44 1.43 0,26 5978728.49 583445.47 N 70.35184722 W 149,32246316 1699,54 33.73 19,32 1512.40 1591,10 -184.40 478.86 456,24 142,12 0.43 -0.42 0.12 5978778,59 583462.36 N 70,35198358 W 149,32232152 1797,56 36,27 18,62 1592,68 1671,38 -204,58 535,08 509.41 160.38 2,62 2,59 -0,71 5978831,96 583480.03 N 70,35212883 W 149,32217323 1892,80 37.18 18,91 1669.02 1747,72 -225,21 592.03 563,33 178,70 0,97 0.96 0.30 5978886,07 583497,75 N 70,35227614 W 149,32202448 1988.07 39.87 19,15 1743,55 1822,25 -246.44 651,36 619.42 198,05 2,83 2,82 0,25 5978942,37 583516.48 N 70,35242937 W 149,32186737 2081.93 41.57 20,11 1814,68 1893,38 -267.74 712,59 677.09 218,63 1,93 1,81 1,02 5979000,26 583536.41 N 70,35258691 W 149,32170029 2175,78 42.75 19.75 1884.25 1962,95 -289.36 775.58 736,31 240.10 1,28 1,26 -0.38 5979059,70 583557,22 N 70,35274869 W 149,32152597 2269,96 45,03 20,88 1952,12 2030.82 -311,34 840,87 797,53 262,78 2.56 2.42 1.20 5979121.17 583579,21 N 70.35291593 W 149,32134182 2361,74 45,50 21,16 2016,71 2095.41 -332,55 906,07 858,39 286.17 0,56 0,51 0,31 5979182,28 583601,92 N 70,35308219 W 149,32115193 2458.33 47.95 21,23 2082,92 2161.62 -355.21 976,38 923,95 311,59 2.54 2.54 0,07 5979248.11 583626.61 N 70.35326130 W 149,32094549 2552.24 48,94 21,51 2145.22 2223,92 -377.66 1046.66 989,39 337.20 1,08 1,05 0.30 5979313.83 583651.48 N 70,35344008 W 149.32073755 2645,64 49.74 21.45 2206,07 2284,77 -400,17 1117.51 1055,32 363,14 0,86 0.86 -0,06 5979380,04 583676,69 N 70,35362019 W 149,32052688 2740,10 50.69 21,63 2266.52 2345,22 -423.15 1190.10 1122.84 389,79 1,02 1.01 0.19 5979447,84 583702.59 N 70.35380464 W 149,32031046 2834,26 50.10 21,09 2326,54 2405.24 -446.34 1262,64 1190.40 416,22 0.77 -0.63 -0,57 5979515.68 583728.26 N 70.35398921 W 149,32009588 2928.38 49.29 22,08 2387.43 2466,13 -469,01 1334.42 1257.15 442,62 1,18 -0,86 1.05 5979582,71 583753,91 N 70.35417154 W 149,31988149 3022.90 49,04 23.22 2449.23 2527,93 -490,34 1405.93 1323,14 470.16 0,95 -0.26 1.21 5979649,00 583780,71 N 70,35435183 W 149.31965786 3117.47 48.89 23,30 2511,32 2590.02 -510.89 1477,27 1388,68 498,33 0.17 -0.16 0,08 5979714.84 583808.15 N 70,35453086 W 149,31942910 3152.16 49,11 23,20 2534,08 2612,78 -518.43 1503.45 1412.73 508,66 0,67 0,63 -0.29 5979739.01 583818,21 N 70,35459658 W 149,31934517 3266,50 47.43 25,10 2610,19 2688,89 -541.75 1588,77 1490,59 543,55 1,92 -1.47 1,66 5979817,25 583852.23 N 70.35480928 W 149,31906183 3325.61 49.36 23,06 2649.43 2728.13 -553,88 1632,97 1530,95 561.57 4,16 3.27 -3.45 5979857,79 583869,80 N 70,35491951 W 149.31891549 3420,36 50,09 23.79 2710,69 2789,39 -574,50 1705,25 1597,27 590,31 0.97 0,77 0.77 5979924.43 583897.80 N 70.35510071 W 149.31868208 3515,35 49.54 23,70 2771,98 2850.68 -594,82 1777,82 1663,70 619,53 0,58 -0,58 -0.09 5979991,17 583926,28 N 70.35528217 W 149,31844476 3609.16 49,34 23.32 2832.98 2911,68 -615,05 1849.09 1729,05 647.96 0,37 -0.21 -0.41 5980056,83 583953,98 N 70,35546071 W 149,31821387 3701,35 50.03 21,52 2892.63 2971,33 -636,28 1919.38 1794.03 674.77 1,67 0,75 -1.95 5980122,09 583980,05 N 70.35563821 W 149,31799618 3794.96 50,31 21,39 2952.59 3031,29 -659,14 1991,27 1860.94 701.06 0,32 0.30 -0,14 5980189,28 584005,60 N 70,35582099 W 149,31778262 3888,81 50.23 21.33 3012,57 3091,27 -682.21 2063,45 1928,16 727,35 0,10 -0,09 -0.06 5980256.78 584031.14 N 70.35600462 W 149.31756910 3982.46 49,83 20,65 3072,73 3151.43 -705,59 2135.22 1995,16 753,06 0,70 -0.43 -0.73 5980324,07 584056,1 ° N 70,35618767 W 149,31736028 4076.83 49.57 20,57 3133,77 3212.47 -729.49 2207,19 2062,53 778.39 0.28 -0,28 -0.08 5980391.70 584080,68 N 70,35637170 W 149,31715449 4172.21 49.68 19,90 3195,56 3274,26 -754,06 2279.86 2130,71 803,52 0.55 0.12 -0,70 5980460,15 584105,05 N 70,35655795 W 149.31695036 4266.06 48,39 21,00 3257,08 3335,78 -777.78 2350,72 2197,11 828,28 1,63 -1,37 1,17 5980526,82 584129,06 N 70.35673934 W 149,31674930 4360,01 47.90 21,14 3319.77 3398.47 -800.48 2420.70 2262.41 853.43 0.53 -0,52 0.15 5980592,38 584153.49 N 70,35691772 W 149.31654495 4454.28 47,80 22.75 3383,03 3461,73 -822.14 2490.59 2327,23 879.55 1.27 -0.11 1,71 5980657.49 584178,88 N 70.35709480 W 149,31633280 4548,11 48,18 26,94 3445.85 3524,55 -840.35 2560,29 2390.47 908,84 3,34 0.40 4.47 5980721,04 584207.46 N 70,35726755 W 149,31609491 4641,89 48.96 31.87 3507,92 3586,62 -853.25 2630,58 2451.68 943.36 4,03 0.83 5.26 5980782.62 584241,29 N 70,35743475 W 149,31581454 4735.40 48.79 36,31 3569.44 3648.14 -860.51 2701.01 2509.98 982,82 3,58 -0,18 4.75 5980841.36 584280.10 N 70.35759404 W 149,31549403 4829.57 48,97 40,88 3631,39 3710,09 -862,24 2771,93 2565.40 1027,05 3,66 0,19 4,85 5980897.26 584323,71 N 70,35774541 W 149,31513475 4923.41 48,83 47,15 3693.11 3771.81 -857,30 2842,62 2616.21 1076.14 5,04 -0,15 6,68 5980948.61 584372.22 N 70,35788420 W 149,31473606 SurveyEditor Ver 3,1 RT -SP3.03-HF4,OO Bld( do31 rt-546 ) N-U\L-201\L-201 L 1\L-201 L 1 Generated 4/30/2004 2: 14 PM Page 1 of 5 ) ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft) ( deg/100 ft ) ( deg/100 ft ) (ftUS) (ftUS) 5016.44 49.09 54.19 3754,24 3832,94 -844,31 2912,75 2660.62 1130,36 5,71 0,28 7,57 5980993,62 584425,94 N 70.35800551 W 149,31429571 5110.60 48,23 58,33 3816.45 3895,15 -824,54 2983.43 2699,89 1189.11 3.42 -0.91 4.40 5981033.53 584484,25 N 70,35811275 W 149,31381851 5204,87 49,16 62.86 3878,69 3957,39 -799.63 3054,23 2734,62 1250.78 3,74 0.99 4.81 5981068.94 584545,52 N 70,35820761 W 149.31331763 5298,92 47.75 68.46 3941.09 4019,79 -769,20 3124,59 2763.65 1314,85 4,70 -1,50 5,95 5981098,67 584609,26 N 70.35828687 W 149,31279728 5392,93 49.39 73.49 4003.32 4082.02 -732,92 3195.05 2786,57 1381.46 4,37 1,74 5,35 5981122,34 584675,60 N 70,35834947 W 149.31225633 5487.16 51,11 80,03 4063,61 4142,31 -689,56 3267.47 2803,10 1451,92 5,64 1.83 6.94 5981139,64 584745,86 N 70,35839458 W 149,31168408 5582,88 53.94 84.88 4121,86 4200,56 -638,27 3343.41 2813.00 1527,19 4,99 2,96 5,07 5981150,39 584821,01 N 70.35842161 W 149,31107280 5677.97 56,15 89,22 4176.36 4255,06 -581,23 3421.33 2816,97 1604.99 4.40 2,32 4,56 5981155.22 584898,75 N 70,35843241 W 149,31044097 5769.98 58.26 91,53 4226,20 4304,90 -521,65 3498,66 2816,45 1682.32 3,12 2.29 2.51 5981155.56 584976.08 N 70,35843093 W 149,30981296 5862,16 59.02 94.81 4274,18 4352,88 -458,65 3577,37 2812,09 1760,89 3.15 0,82 3,56 5981152.07 585054,69 N 70,35841896 W 149,30917484 5955,46 61.37 98.97 4320,56 4399.26 -390,85 3658,32 2802.35 1841,23 4,62 2.52 4.46 5981143,22 585135,12 N 70,35839229 W 149.30852243 6049.62 64.61 102,59 4363,33 4442.03 -317,64 3742.19 2786,62 1923.60 4,85 3.44 3.84 5981128.42 585217.66 N 70,35834929 W 149.30785351 6143,03 65.95 107.59 4402.41 4481,11 -240,71 3827,03 2764,52 2005.48 5.07 1.43 5.35 5981107.23 585299.77 N 70,35828886 W 149.30718859 6237,33 68.65 110,96 4438.81 4517,51 -159.36 3914,01 2735.79 2087,57 4,37 2,86 3,57 5981079.42 585382,17 N 70.35821030 W 149.30652201 6330.67 72.77 113,73 4469,64 4548,34 -75.43 4002,09 2702,28 2169.02 5,23 4.41 2,97 5981046,82 585463,97 N 70.35811869 W 149,30586065 6372.00 74.45 114,96 4481.31 4560.01 -37,25 4041.74 2685,94 2205.14 4,97 4,06 2,98 5981030,88 585500,27 N 70,35807401 W 149,30556734 6384.00 76.22 115.73 4484,34 4563,04 -26.02 4053,35 2680,97 2215,63 16,00 14,75 6.42 5981026,03 585510,82 N 70,35806043 W 149.30548216 6404.88 78.82 115.47 4488.86 4567,56 -6.28 4073,73 2672,16 2234.02 12,51 12.45 -1,25 5981017.42 585529,30 N 70.35803635 W 149,30533288 6436.12 81.44 115,09 4494.21 4572.91 23.49 4104.51 2659,02 2261.84 8.47 8.39 -1,22 5981004,59 585557,27 N 70,35800042 W 149,30510693 6467,35 85.08 114.71 4497,87 4576,57 53.43 4135,52 2645,96 2289.97 11,72 11.66 -1,22 5980991,85 585585.53 N 70,35796473 W 149,30487854 6498,50 89.31 114,33 4499.40 4578,10 83.40 4166,62 2633,05 2318,27 13.63 13,58 -1,22 5980979,26 585613,97 N 70,35792944 W 149,30464875 6530.44 90.86 113,95 4499.35 4578.05 114,13 4198.56 2619,99 2347.42 5,00 4,85 -1,19 5980966,52 585643.26 N 70,35789374 W 149,30441209 6561,55 92,09 113.58 4498,55 4577,25 143,98 4229,66 2607.46 2375.88 4.13 3.95 -1.19 5980954,31 585671,86 N 70,35785947 W 149,30418099 6592.41 93.09 113,22 4497,16 4575,86 173.53 4260,49 2595.22 2404.17 3.44 3,24 -1,17 5980942.38 585700,28 N 70,35782600 W 149,30395125 6624,01 90.26 112,85 4496.23 4574.93 203,74 4292.07 2582,86 2433.24 9,03 -8,96 -1,17 5980930,35 585729.48 N 70.35779221 W 149,30371526 6655,31 90,02 113.77 4496.16 4574.86 233,72 4323.37 2570.47 2461,98 3,04 -0,77 2.94 5980918,29 585758.36 N 70,35775835 W 149,30348185 6685.25 92.97 114,91 4495,38 4574,08 262.53 4353,30 2558.14 2489.25 10.56 9,85 3,81 5980906,26 585785,75 N 70,35772463 W 149.30326046 6716,74 90,67 113,70 4494.38 4573.08 292,83 4384.77 2545,19 2517.93 8,25 -7,30 -3,84 5980893.63 585814.58 N 70.35768922 W 149,30302757 6747,77 89.47 117,00 4494,34 4573,04 322,85 4415,80 2531,90 2545,97 11,32 -3.87 10,63 5980880,66 585842.76 N 70,35765290 W 149,30279992 6778.97 90.26 119,95 4494.41 4573.11 353.42 4447,00 2517,03 2573.39 9.79 2.53 9.46 5980866.09 585870,34 N 70,35761225 W 149,30257727 6809,74 91,32 122,81 4493.99 4572,69 383.83 4477,76 2501,01 2599.65 9,91 3.44 9,29 5980850,37 585896,78 N 70,35756846 W 149.30236403 6841.42 92.42 125,31 4492,95 4571,65 415,32 4509.43 2483,28 2625,88 8.62 3.47 7.89 5980832,93 585923,20 N 70,35751999 W 149,30215108 6872.99 92.45 123,71 4491,61 4570,31 446.72 4540,97 2465.41 2651.87 5.06 0,10 -5,07 5980815.35 585949,39 N 70,35747115 W 149,30194007 6903,56 90,22 122,19 4490.90 4569.60 477,04 4571.53 2448.79 2677,51 8,83 -7,29 -4,97 5980799,02 585975.21 N 70.35742572 W 149,30173188 6934,63 87.92 119.45 4491.40 4570.10 507,71 4602,59 2432,87 2704,19 11,51 -7.40 -8.82 5980783.40 586002,06 N 70,35738222 W 149.30151531 6966.17 89.98 121,64 4491,98 4570,68 538.81 4634,13 2416,85 2731.34 9.53 6,53 6,94 5980767.68 586029,39 N 70,35733841 W 149.30129483 6996,79 91.52 120,94 4491.58 4570.28 569,07 4664.74 2400,95 2757,51 5,52 5,03 -2.29 5980752,07 586055.72 N 70.35729495 W 149,30108242 7028.26 92.31 122,84 4490,53 4569,23 600.21 4696,19 2384.33 2784.21 6.54 2,51 6.04 5980735,76 586082,61 N 70,35724953 W 149,30086562 7057.40 92,97 122,97 4489,19 4567,89 629.10 4725,30 2368.52 2808,65 2,31 2,26 0.45 5980720,22 586107,22 N 70,35720630 W 149,30066720 7089,66 90.94 124,36 4488.09 4566.79 661,14 4757.54 2350,65 2835.48 7,62 -6,29 4,31 5980702,65 586134,24 N 70.35715745 W 149.30044936 7120,81 89.71 125.41 4487,91 4566,61 692,16 4788,69 2332,83 2861.03 5.19 -3.95 3.37 5980685,12 586159,99 N 70,35710876 W 149,30024193 7152,24 89,26 125.44 4488.19 4566,89 723.49 4820.12 2314,62 2886,64 1.43 -1.43 0,10 5980667.19 586185,80 N 70.35705896 W 149.30003401 7182,85 89.09 126.42 4488,63 4567.33 754,02 4850.73 2296.66 2911 .43 3.25 -0.56 3.20 5980649,51 586210,78 N 70,35700987 W 149,29983281 7213,84 89,98 128,58 4488,88 4567.58 784.98 4881,72 2277. 79 2936,01 7,54 2,87 6,97 5980630.92 586235,57 N 70,35695831 W 149,29963324 7245,39 88,88 127,80 4489.20 4567,90 816.51 4913.26 2258,29 2960,81 4,27 -3.49 -2.47 5980611,70 586260,57 N 70,35690500 W 149.29943195 7276,71 88.20 128,13 4490,00 4568.70 847,80 4944,57 2239,03 2985.49 2.41 -2.17 1.05 5980592,71 586285.47 N 70,35685235 W 149,29923157 7306,90 88,02 128.77 4490.99 4569,69 877,96 4974.75 2220,26 3009,12 2,20 -0,60 2,12 5980574,22 586309,30 N 70.35680107 W 149.29903974 7338,68 90.74 130,58 4491.34 4570.04 909,73 5006.52 2199,98 3033,58 10,28 8,56 5,70 5980554,21 586333.98 N 70.35674562 W 149.29884121 7369.54 91,87 129.16 4490,63 4569,33 940.59 5037,37 2180.20 3057.25 5,88 3,66 -4,60 5980534.70 586357,88 N 70,35669157 W 149,29864900 7400,91 92,35 127,28 4489.48 4568,18 971,92 5068.72 2160,81 3081,88 6,18 1,53 -5,99 5980515,58 586382.72 N 70.35663856 W 149,29844908 7431,85 92.11 127,90 4488.27 4566,97 1002,81 5099.64 2141,95 3106,38 2,15 -0,78 2,00 5980496,99 586407.42 N 70.35658701 W 149.29825021 7463,94 92,11 125,69 4487,09 4565,79 1034,82 5131.71 2122,74 3132,06 6,88 0,00 -6,89 5980478.08 586433,31 N 70,35653451 W 149,29804176 7493,05 91.42 123,68 4486.20 4564,90 1063,79 5160.80 2106,19 3155,98 7,30 -2.37 -6,90 5980461,79 586457.41 N 70.35648925 W 149,29784754 7524,80 90,12 121,74 4485,77 4564.47 1095,28 5192,55 2089.03 3182.69 7,35 -4.09 -6.11 5980444,93 586484,31 N 70,35644236 W 149.29763070 7555.28 89,09 119.65 4485,98 4564,68 1125,36 5223.03 2073.47 3208,90 7,64 -3,38 -6,86 5980429.67 586510,68 N 70,35639983 W 149,29741794 7587.15 88.95 118,02 4486.52 4565,22 1156,62 5254.89 2058.11 3236.81 5.13 -0.44 -5.11 5980414.61 586538,76 N 70,35635781 W 149,29719133 7617,36 88.44 116.26 4487,21 4565,91 1186.06 5285.10 2044,33 3263,69 6,06 -1,69 -5,83 5980401.14 586565,79 N 70,35632014 W 149,29697314 7647,33 89.09 116,04 4487,86 4566,56 1215,15 5315.06 2031,12 3290,58 2.29 2,17 -0,73 5980388.23 586592,83 N 70.35628403 W 149,29675478 7677.57 89.60 114,59 4488.20 4566,90 1244.40 5345,30 2018,20 3317,92 5.08 1,69 -4,80 5980375,61 586620,30 N 70,35624868 W 149,29653287 7708,53 90,12 114.06 4488,28 4566,98 1274,21 5376,26 2005,44 3346.13 2.40 1,68 -1,71 5980363.17 586648,65 N 70,35621381 W 149,29630384 7739,39 90,12 115.48 4488,21 4566,91 1303,99 5407.12 1992,51 3374,15 4,60 0,00 4,60 5980350.56 586676,81 N 70,35617845 W 149,29607635 7769,77 90,15 114,37 4488.14 4566.84 1333.32 5437,50 1979,71 3401.70 3,66 0,10 -3,65 5980338,06 586704,50 N 70,35614344 W 149,29585269 7800.51 89.81 114.58 4488.15 4566.85 1362.94 5468.24 1966.98 3429.68 1.30 -1.11 0.68 5980325,64 586732,61 N 70,35610861 W 149,29562555 7830.73 89,57 114,06 4488.32 4567,02 1392,03 5498.46 1954.53 3457.21 1.90 -0.79 -1,72 5980313,50 586760.28 N 70.35607458 W 149.29540198 7860,94 89,91 113,75 4488.45 4567,15 1421,06 5528,67 1942,29 3484,83 1,52 1,13 -1,03 5980301.57 586788.03 N 70.35604110 W 149.29517776 7891,93 89,64 114,24 4488,58 4567,28 1450,85 5559.66 1929,69 3513,14 1,81 -0,87 1.58 5980289,29 586816.48 N 70,35600664 W 149.29494791 7922.42 87,99 113,27 4489.21 4567.91 1480.11 5590.14 1917.41 3541,04 6,28 -5.41 -3,18 5980277.32 586844,51 N 70.35597306 W 149,29472141 7952,82 86,82 111.52 4490,58 4569,28 1509,06 5620,51 1905,84 3569,12 6,92 -3,85 -5.76 5980266.06 586872,71 N 70.35594141 W 149,29449347 7983,67 89.33 113,81 4491.62 4570,32 1538.48 5651,34 1893.96 3597,57 11.01 8.14 7,42 5980254.50 586901.29 N 70,35590892 W 149,29426252 8014.45 91.08 114.14 4491.51 4570.21 1568,07 5682.11 1881.45 3625.69 5,79 5,69 1.07 5980242.31 586929,55 N 70,35587472 W 149,29403421 8045.57 91.25 112.93 4490.88 4569.58 1597.90 5713.23 1869.03 3654.22 3.93 0.55 -3.89 5980230.21 586958.20 N 70.35584074 W 149.29380263 SurveyEditor Ver 3,1 RT-SP3,03-HF4,OO Bld( do31 rt-546 ) N-U\L-201\L-201 L 1\L-201 L 1 Generated 4/30/2004 2: 14 PM Page 2 of 5 ') ') Measured Inclination AzImuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft) (ft) (ft ) (ft ) ( deg/100 ft ) ( deg/1 00 ft ) ( deg/100 ft ) (ftUS) (ftUS) 8076,05 91.11 112,84 4490,25 4568,95 1627,03 5743,70 1857,18 3682,29 0.55 -0.46 -0,30 5980218,67 586986.41 N 70,35580833 W 149.29357471 8106,65 90.56 113,29 4489,80 4568,50 1656.30 5774,30 1845.19 3710.44 2,32 -1,80 1,47 5980207,00 587014.69 N 70,35577554 W 149.29334617 8137,26 91.01 114,11 4489,38 4568,08 1685.67 5804,90 1832,89 3738.47 3,06 1.47 2,68 5980195,01 587042,84 N 70,35574189 W 149,29311865 8168,01 90,87 112,06 4488,88 4567,58 1715,09 5835,65 1820.83 3766.75 6.68 -0.46 -6,67 5980183,27 587071.26 N 70,35570892 W 149,29288904 8199,28 89.36 109.99 4488.82 4567,52 1744,66 5866,92 1809,61 3795.94 8,19 -4,83 -6.,62 5980172.38 587100,56 N 70,35567824 W 149,29265210 8229.84 89.30 108,59 4489.17 4567,87 1773,24 5897.48 1799,52 3824,78 4.59 -0,20 -4,58 5980162,61 587129.51 N 70,35565062 W 149,29241795 8260.46 88.75 106,32 4489,69 4568,39 1801.51 5928,09 1790,34 3853.98 7.63 -1.80 -7.41 5980153,75 587158.81 N 70,35562549 W 149.29218085 8291,36 89.43 107,50 4490,19 4568.89 1829,93 5958,99 1781,35 3883,54 4.41 2.20 3,82 5980145,09 587188.47 N 70,35560090 W 149,29194086 8323,15 90.67 108,12 4490,16 4568.86 1859,37 5990,78 1771,63 3913.81 4,36 3,90 1,95 5980135,71 587218,84 N 70,35557429 W 149,29169514 8354,13 90.56 107.75 4489,83 4568,53 1888.08 6021,76 1762.09 3943.28 1,25 -0,36 -1.19 5980126.50 587248.41 N 70.35554819 W 149,29145587 8384.87 90.12 107,21 4489.64 4568,34 1916.47 6052,50 1752,85 3972,60 2.27 -1.43 -1.76 5980117,59 587277.83 N 70,35552292 W 149,29121783 8415,30 88.47 106.43 4490.02 4568,72 1944.44 6082,92 1744.05 4001,72 6,00 -5.42 -2,56 5980109,11 587307.05 N 70,35549883 W 149.29098138 8447,69 89,36 107.40 4490,63 4569,33 1974,23 6115,31 1734,63 4032,71 4,06 2.75 2,99 5980100,04 587338.13 N 70.35547304 W 149.29072984 8478,65 90.70 109,62 4490,61 4569,31 2003.04 6146.27 1724,80 4062.06 8,38 4.33 7,17 5980090,54 587367,59 N 70,35544615 W 149,29049151 8509,62 92.66 110.01 4489,71 4568.41 2032,09 6177.22 1714,31 4091.18 6.45 6,33 1,26 5980080.37 587396,82 N 70,35541744 W 149,29025509 8541.08 92.86 109.90 4488.19 4566,89 2061,61 6208,64 1703,58 4120,72 0.73 0,64 -0.35 5980069,97 587426.48 N 70.35538810 W 149,29001530 8571.91 92,72 108.98 4486.69 4565.39 2090,44 6239.44 1693,33 4149,76 3.01 -0,45 -2,98 5980060,05 587455.62 N 70,35536006 W 149.28977956 8603,14 92,18 110.47 4485,36 4564,06 2119,71 6270,64 1682,80 4179.13 5,07 -1,73 4,77 5980049,85 587485.11 N 70,35533125 W 149.28954113 8634,38 88.92 109,35 4485,06 4563.76 2149.05 6301.87 1672.17 4208.49 11,03 -10.44 -3,59 5980039,54 587514,59 N 70,35530214 W 149.28930272 8665.48 87.30 109,79 4486,08 4564.78 2178.17 6332.96 1661,76 4237.78 5.40 -5,21 1.41 5980029.46 587543,98 N 70,35527365 W 149,28906496 8696.92 87,07 109.71 4487,63 4566,33 2207,63 6364.36 1651,15 4267,34 0.77 -0,73 -0,25 5980019,18 587573,65 N 70.35524462 W 149.28882503 8728.38 87,00 109,56 4489.25 4567,95 2237,09 6395,78 1640,59 4296,93 0.53 -0,22 -0.48 5980008,95 587603.36 N 70,35521573 W 149.28858480 8759,09 87.37 109,85 4490.76 4569.46 2265,86 6426.45 1630,25 4325,80 1.53 1,20 0,94 5979998.93 587632,34 N 70,35518743 W 149.28835038 8791,07 87.13 110,95 4492,30 4571,00 2295.95 6458.39 1619.11 4355.74 3,52 -0.75 3.44 5979988,13 587662.40 N 70,35515697 W 149,28810733 8822.42 85.45 113,38 4494,32 4573.02 2325.73 6489.67 1607,31 4384.71 9,41 -5,36 7,75 5979976.65 587691,50 N 70,35512468 W 149,28787216 8853,19 85,21 111,55 4496.83 4575,53 2354,97 6520,34 1595,59 4413,05 5.98 -0,78 -5,95 5979965,25 587719.96 N 70,35509262 W 149.28764210 8884,30 84.80 111,59 4499.54 4578,24 2384,37 6551,33 1584,20 4441.87 1,32 -1,32 0,13 5979954,18 587748,91 N 70,35506145 W 149.28740813 8916,32 84.62 112,56 4502.49 4581.19 2414,71 6583,22 1572.22 4471.42 3,07 -0.56 3.03 5979942,53 587778,58 N 70,35502867 W 149.28716828 8946.42 85.04 114,27 4505.20 4583.90 2443.43 6613.20 1560,30 4498.93 5,83 1.40 5,68 5979930.92 587806,22 N 70,35499608 W 149,28694498 8978,21 86,24 116,51 4507,62 4586.32 2474,10 6644,89 1546,71 4527,56 7,98 3,77 7.05 5979917.65 587835,00 N 70.35495890 W 149,28671255 9009.58 89.09 119,57 4508.90 4587,60 2504,76 6676,23 1531,98 4555.22 13.32 9,09 9,75 5979903,23 587862.81 N 70,35491861 W 149.28648804 9041,71 90.63 118.97 4508,98 4587.68 2536,33 6708.36 1516,27 4583.25 5.14 4.79 -1,87 5979887,84 587891,01 N 70,35487565 W 149.28626055 9072.65 90.43 118,64 4508,69 4587.39 2566.68 6739,30 1501,37 4610.36 1,25 -0,65 -1,07 5979873.23 587918,28 N 70,35483488 W 149,28604050 9103,96 88,06 119,27 4509,10 4587,80 2597.40 6770,61 1486,21 4637.75 7.83 -7,57 2,01 5979858.38 587945,84 N 70.35479343 W 149,28581816 9134.01 87.17 119.06 4510.35 4589,05 2626.89 6800,63 1471,58 4663,96 3.04 -2,96 -0,70 5979844,05 587972.22 N 70,35475342 W 149,28560536 9165.46 88.61 123,39 4511,51 4590,21 2657,94 6832.06 1455.29 4690.83 14,50 4.58 13,77 5979828,06 587999.26 N 70,35470887 W 149.28538728 9197,72 89,09 123.47 4512,16 4590.86 2689.99 6864,31 1437,52 4717,75 1.51 1.49 0.25 5979810.59 588026,37 N 70,35466028 W 149,28516881 9227.58 89.19 124,58 4512,61 4591,31 2719,68 6894,17 1420.81 4742,50 3.73 0,33 3.72 5979794.16 588051.30 N 70.35461460 W 149,28496798 9257.44 90.32 126.34 4512.74 4591.44 2749.45 6924,03 1403.49 4766,82 7,00 3,78 5,89 5979777.12 588075.81 N 70.35456723 W 149,28477059 9289,25 91.73 124,85 4512.17 4590.87 2781,15 6955.83 1384,98 4792.68 6.45 4,43 -4,68 5979758,89 588101,87 N 70,35451662 W 149.28456071 9320,84 91.70 125.41 4511.22 4589.92 2812.62 6987.41 1366.81 4818.50 1.77 -0,09 1,77 5979741.02 588127,89 N 70.35446694 W 149,28435113 9351.30 89.71 124,79 4510,85 4589,55 2842,96 7017,86 1349,30 4843.42 6.84 -6,53 -2,04 5979723,78 588153.00 N 70.35441905 W 149,28414890 9383.28 89,06 121.44 4511.19 4589,89 2874,70 7049,84 1331,83 4870.20 10,67 -2,03 -10.48 5979706,61 588179.97 N 70.35437128 W 149.28393155 9415.66 88.64 119,19 4511.84 4590,54 2906.61 7082.21 1315.49 4898.14 7,07 -1.30 -6,95 5979690.59 588208,09 N 70,35432659 W 149.28370473 9445,51 88.64 118,31 4512,55 4591.25 2935.88 7112,06 1301.14 4924,31 2,95 0,00 -2,95 5979676.53 588234.41 N 70.35428734 W 149,28349239 9476.77 88,06 118.15 4513.45 4592,15 2966.47 7143.30 1286,36 4951,84 1,92 -1,86 -0,51 5979662,06 588262,10 N 70,35424691 W 149,28326893 9508.40 88.92 118,02 4514.28 4592,98 2997.41 7174,92 1271.47 4979.73 2,75 2.72 -0,41 5979647.48 588290,16 N 70,35420619 W 149.28304251 9539.49 91.45 117,69 4514,18 4592.88 3027.80 7206,01 1256,95 5007,22 8.21 8,14 -1.06 5979633.27 588317,80 N 70,35416646 W 149.28281942 9570,67 91,69 115,99 4513,33 4592.03 3058.15 7237,18 1242,88 5035,03 5.50 0,77 -5,45 5979619.51 588345.76 N 70.35412797 W 149,28259371 9601,60 90.73 115.66 4512,67 4591,37 3088,13 7268.10 1229.41 5062,86 3,28 -3,10 -1,07 5979606,35 588373.74 N 70,35409112 W 149,28236778 9632.44 90.02 116,19 4512.47 4591,17 3118.04 7298,94 1215.92 5090,60 2.87 -2,30 1,72 5979593.17 588401,62 N 70,35405423 W 149.28214265 9664,07 90.77 116,77 4512,25 4590,95 3148.80 7330,57 1201,82 5118,91 3,00 2.37 1.83 5979579.39 588430,09 N 70.35401565 W 149.28191287 9693,72 90.53 117,22 4511,92 4590,62 3177,68 7360.22 1188,36 5145,32 1.72 -0,81 1,52 5979566,23 588456.65 N 70.35397884 W 149,28169845 9725,05 90.39 117,34 4511.67 4590,37 3208,24 7391.55 1174.00 5173,17 0,59 -0.45 0,38 5979552,18 588484,65 N 70,35393956 W 149,28147245 9756,38 90,36 116.36 4511.46 4590.16 3238,75 7422.87 1159,85 5201.12 3.13 -0.10 -3,13 5979538.34 588512,75 N 70,35390085 W 149,28124558 9787,10 90,05 116,02 4511,35 4590.05 3268,58 7453,59 1146,30 5228,69 1.50 -1.01 -1.11 5979525.09 588540.47 N 70.35386375 W 149.28102184 9818.66 89.12 112.37 4511,58 4590,28 3298,94 7485.15 1133.36 5257.47 11,93 -2,95 -11,57 5979512.48 588569,39 N 70,35382837 W 149,28078823 9850.03 89,60 112.41 4511.93 4590,63 3328,84 7516.52 1121.41 5286.47 1.54 1,53 0,13 5979500,86 588598,52 N 70,35379567 W 149,28055281 9880.60 91,39 111.26 4511,67 4590,37 3357.88 7547,09 1110,05 5314,85 6.96 5.86 -3.76 5979489.81 588627,01 N 70,35376456 W 149.28032250 9911,56 90.43 109,87 4511,17 4589.87 3387,08 7578,04 1099,17 5343,83 5.46 -3,10 -4.49 5979479,26 588656.11 N 70.35373480 W 149.28008725 9943.42 90.12 110.07 4511.02 4589,72 3417,01 7609.90 1088.29 5373.77 1,16 -0,97 0,63 5979468,71 588686.17 N 70,35370501 W 149,27984418 9974.09 90.05 111.70 4510.98 4589.68 3445,99 7640.57 1077,36 5402.43 5.32 -0,23 5,31 5979458.10 588714,94 N 70.35367509 W 149.27961160 10004,93 89,88 111,98 4510,99 4589,69 3475.29 7671.41 1065,89 5431,05 1,06 -0,55 0.91 5979446,95 588743,69 N 70.35364369 W 149,27937924 10036.15 90.39 112.91 4510.92 4589,62 3505,06 7702,63 1053.97 5459.91 3.40 1.63 2,98 5979435.35 588772.68 N 70.35361107 W 149.27914503 10067.08 89,09 112.34 4511.06 4589,76 3534.57 7733,56 1042,07 5488.46 4.59 -4.20 -1,84 5979423.77 588801,35 N 70.35357851 W 149,27891331 10098,67 88,85 114.23 4511,63 4590,33 3564,82 7765,15 1029,58 5517.47 6.03 -0,76 5,98 5979411.61 588830,50 N 70.35354434 W 149,27867784 10130,00 89.16 116,60 4512.17 4590.87 3595,14 7796.47 1016.14 5545,76 7,63 0,99 7,56 5979398.48 588858.94 N 70.35350756 W 149,27844822 10160,91 89,29 120.23 4512,59 4591,29 3625.41 7827,38 1001.43 5572,94 11,75 0.42 11.74 5979384,08 588886,27 N 70,35346733 W 149.27822763 10191,71 88,78 121.93 4513,11 4591,81 3655.83 7858,18 985,54 5599,31 5.76 -1,66 5,52 5979368.48 588912.82 N 70.35342385 W 149.27801360 10222,85 88,68 121,29 4513.80 4592.50 3686,63 7889.31 969.22 5625,82 2,08 -0,32 -2,06 5979352,46 588939,51 N 70.35337922 W 149.27779843 10253.90 89.12 122,65 4514.40 4593,1 ° 3717.37 7920,35 952,78 5652.16 4.60 1.42 4.38 5979336.32 588966.02 N 70.35333426 W 149.27758471 10284,54 91.46 126,20 4514,24 4592,94 3747,86 7950,99 935.47 5677.43 13.88 7.64 11.59 5979319,29 588991.48 N 70.35328690 W 149.27737967 SurveyEditor Ver 3,1 RT-SP3,03-HF4,OO Bld( do31rt-546 ) N-U\L-201\L-201L 1\L-201L 1 Generated 4/30/2004 2:14 PM Page 3 of 5 ') ') Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Wal k Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/1 00 ft ) ( deg/100 ft ) (ftUS) (ftUS) 10315.84 90.70 127,26 4513,65 4592.35 3779.10 7982,28 916,75 5702,51 4.17 -2.43 3,39 5979300.85 589016,77 N 70,35323572 W 149.27717615 10347,07 90.15 131.82 4513.42 4592,12 3810,32 8013,51 896,87 5726,59 14.71 -1,76 14,60 5979281,25 589041,06 N 70,35318137 W 149.27698079 10377,71 89.06 131,00 4513,63 4592,33 3840,95 8044.15 876.61 5749,56 4.45 -3,56 -2,68 5979261,24 589064,26 N 70,35312596 W 149,27679435 10408,69 90.53' 134,84 4513,74 4592.44 3871.88 8075,13 855,52 5772.25 13,27 4.74 12,39 5979240.40 589087,17 N 70,35306829 W 149,27661033 10439.54 91.90 134.72 4513,09 4591,79 3902,62 8105,97 833,79 5794,14 4.46 4.44 -0.39 5979218.93 589109,30 N 70.35300889 W 149.27643272 10470,84 90.63 134.88 4512.40 4591,10 3933,80 8137,26 811.74 5816,34 4,09 -4,06 0,51 5979197,13 589131,75 N 70,35294861 W 149,27625259 10502.36 89.40 133.61 4512,39 4591,09 3965,23 8168.78 789,75 5838.92 5,61 -3,90 -4.03 5979175,39 589154,57 N 70,35288848 W 149,27606941 10532,27 89,02 133,17 4512,80 4591,50 3995.08 8198,69 769,21 5860.65 1,94 -1,27 -1.47 5979155,09 589176,53 N 70,35283231 W 149,27589309 10563,29 87.89 133,03 4513.64 4592,34 4026,05 8229,70 748.02 5883.29 3,67 -3,64 -0.45 5979134,16 589199.40 N 70,35277438 W 149.27570940 10595,16 87,24 132.13 4514,99 4593,69 4057,86 8261,54 726.48 5906.74 3.48 -2,04 -2.82 5979112,88 589223,08 N 70,35271547 W 149,27551919 1 0625.40 87.21 132.23 4516.46 4595,16 4088,04 8291,75 706,19 5929.12 0,34 -0,10 0,33 5979092.85 589245,69 N 70,35266002 W 149,27533760 10656.58 87.41 132,73 4517,92 4596,62 4119.15 8322.89 685,16 5952,09 1,73 0,64 1,60 5979072.07 589268,89 N 70,35260250 W 149.27515124 10687.99 87.03 133.81 4519.44 4598,14 4150.48 8354.26 663,66 5974,94 3,64 -1,21 3.44 5979050,83 589291,97 N 70.35254371 W 149.27496592 10719.41 87,58 133.71 4520,92 4599,62 4181,79 8385.65 641,95 5997.60 1,78 1,75 -0.32 5979029,38 589314,87 N 70,35248436 W 149,27478203 10750.39 90.63 134,61 4521.40 4600,10 4212,68 8416,62 620,37 6019.82 10,26 9,85 2,91 5979008.05 589337,33 N 70,35242536 W 149,27460178 10781,93 91.01 135,39 4520,95 4599,65 4244.10 8448,16 598,07 6042,12 2,75 1.20 2.47 5978986,00 589359,87 N 70.35236439 W 149,27442088 10812.63 91.32 135.29 4520.33 4599.03 4274,66 8478,85 576.24 6063.70 1.06 1,01 -0,33 5978964.41 589381.68 N 70,35230470 W 149.27424586 10843,92 90.94 134,37 4519.71 4598.41 4305,83 8510.14 554,19 6085.88 3.18 -1,21 -2,94 5978942,61 589404,11 N 70,35224440 W 149,27406588 10875.26 90.87 134,34 4519,22 4597.92 4337.08 8541.47 532,28 6108,29 0,24 -0.22 -0,10 5978920.95 589426.76 N 70.35218450 W 149,27388412 10905,66 91.28 134.49 4518.65 4597.35 4367.38 8571,87 511.01 6130.00 1.44 1,35 0.49 5978899,93 589448.70 N 70,35212634 W 149.27370800 10938,01 92,83 132,85 4517.49 4596.19 4399,64 8604.19 488.68 6153.38 6,97 4,79 -5,07 5978877,87 589472,33 N 70,35206531 W 149,27351831 10969,30 93.27 133,51 4515,82 4594,52 4430,84 8635.44 467,30 6176.17 2,53 1.41 2.11 5978856,74 589495,35 N 70,35200685 W 149,27333348 10999,82 92.21 131,65 4514,36 4593.06 4461.29 8665,93 446,68 6198,61 7,01 -3.47 -6,09 5978836.37 589518,02 N 70.35195045 W 149,27315138 11030,30 91.18 131.73 4513.46 4592.16 4491,75 8696.39 426.42 6221.36 3,39 -3,38 0,26 5978816,36 589540,99 N 70,35189504 W 149.27296682 11061,81 90.87 131,04 4512,90 4591,60 4523,24 8727,90 405,59 6245,00 2.40 -0,98 -2.19 5978795.80 589564,86 N 70,35183809 W 149,27277506 11092.72 90.91 131 .97 4512.42 4591,12 4554.14 8758,80 385,11 6268.15 3,01 0,13 3,01 5978775.58 589588.23 N 70.35178208 W 149.27258729 11123.41 90,94 131,99 4511,92 4590,62 4584.81 8789.49 364.58 6290.96 0.12 0.10 0,07 5978755,31 589611.26 N 70,35172596 W 149,27240223 11153,99 90.84 131.88 4511.45 4590.15 4615,36 8820.06 344.15 6313.70 0.49 -0,33 -0.36 5978735,13 589634,23 N 70,35167008 W 149.27221771 11185,30 90,63 130,92 4511,04 4589,74 4646,66 8851,37 323.44 6337.19 3,14 -0.67 -3,07 5978714,70 589657,94 N 70.35161347 W 149,27202721 11216.61 90.46 131,67 4510,75 4589.45 4677.96 8882,68 302.78 6360.71 2.46 -0,54 2.40 5978694,30 589681.69 N 70,35155697 W 149,27183638 11247,27 90.60 132,30 4510.46 4589.16 4708,60 8913.34 282,27 6383.50 2.10 0.46 2,05 5978674,05 589704.71 N 70,35150089 W 149.27165151 11273.99 90.39 132.13 4510,23 4588,93 4735,30 8940,06 264,32 6403,29 1,01 -0,79 -0,64 5978656.32 589724,69 N 70,35145179 W 149,27149098 11304,91 90.49 131,96 4509,99 4588.69 4766,20 8970,98 243,61 6426,25 0.64 0.32 -0,55 5978635,87 589747.88 N 70.35139517 W 149,27130472 11337.59 90.39 131.48 4509,74 4588.44 4798,87 9003.66 221.87 6450,64 1,50 -0,31 -1.47 5978614.40 589772,51 N 70,35133570 W 149.27110685 11368,37 89,23 133,02 4509,85 4588,55 4829,62 9034,44 201,17 6473.42 6,26 -3,77 5,00 5978593,96 589795,52 N 70.35127911 W 149,27092204 11403,91 86.48 133,31 4511,18 4589,88 4865.08 9069,95 176,88 6499.33 7.78 -7.74 0,82 5978569.96 589821.69 N 70,35121268 W 149,27071193 11433,39 85.65 133,91 4513.20 4591,90 4894.43 9099.36 156,59 6520,62 3.47 -2,82 2.04 5978549,91 589843,20 N 70,35115722 W 149,27053920 11465.45 86,55 133.21 4515,38 4594,08 4926,35 9131,34 134,55 6543,80 3,55 2,81 -2,18 5978528.13 589866,62 N 70.35109695 W 149.27035119 11495,99 87.51 134,06 4516,96 4595,66 4956.79 9161,84 113.51 6565.87 4,20 3,14 2,78 5978507,33 589888.93 N 70,35103940 W 149,27017214 11527,54 87.92 134.13 4518.22 4596.92 4988,23 9193.37 91,57 6588.51 1,32 1,30 0.22 5978485.65 589911,81 N 70,35097941 W 149,26998850 11559.80 85,90 134.51 4519,96 4598,66 5020,35 9225,58 69,06 6611.56 6,37 -6.26 1,18 5978463.41 589935,10 N 70.35091788 W 149.26980157 11590.10 85.31 133,86 4522,28 4600,98 5050.48 9255,79 48,01 6633.22 2.89 -1.95 -2,15 5978442,59 589956.99 N 70,35086030 W 149,26962585 11622.43 85.28 133,20 4524,93 4603,63 5082.64 9288.01 25.82 6656,58 2,04 -0,09 -2,04 5978420.67 589980,60 N 70,35079962 W 149,26943637 11652.81 85.93 134,53 4527,26 4605,96 5112,86 9318,30 4,83 6678.42 4.86 2.14 4,38 5978399,92 590002.67 N 70.35074223 W 149.26925924 11683,81 87.24 135,20 4529,11 4607,81 5143.70 9349.24 -17.00 6700,35 4,74 4,23 2,16 5978378,34 590024,84 N 70,35068254 W 149,26908135 11714,53 86,52 136,13 4530,78 4609.48 5174.22 9379.92 -38,94 6721,79 3,82 -2,34 3.03 5978356.64 590046,51 N 70,35062255 W 149,26890748 11746,62 84,86 137.38 4533.19 4611,89 5206,00 9411,92 -62,25 6743.71 6.47 -5.17 3,90 5978333,58 590068.69 N 70.35055882 W 149,26872968 11775,98 85.39 137,24 4535,69 4614,39 5235.01 9441,17 -83.75 6763,55 1,87 1,81 -0.48 5978312.30 590088,76 N 70,35050003 W 149.26856882 11808,31 85,83 137.57 4538.16 4616,86 5266,98 9473.41 -107.48 6785,36 1,70 1.36 1,02 5978288,82 590110,84 N 70.35043515 W 149,26839189 11840.09 85.93 137,75 4540.44 4619.14 5298.39 9505,10 -130,91 6806,71 0.65 0.31 0,57 5978265,63 590132.45 N 70,35037108 W 149,26821875 11870.70 86.55 137.63 4542.45 4621,15 5328,66 9535.65 -153,50 6827,27 2,06 2,03 -0.39 5978243.27 590153,26 N 70,35030932 W 149,26805200 11901,83 87,10 137,18 4544.18 4622.88 5359.49 9566,73 -176,38 6848,31 2,28 1,77 -1.45 5978220,63 590174,54 N 70,35024676 W 149,26788140 11932.56 87,68 136.25 4545,57 4624,27 5389.97 9597.43 -198,73 6869.36 3,56 1.89 -3,03 5978198,52 590195.84 N 70,35018566 W 149,26771071 11962,87 86.28 135,72 4547,17 4625,87 5420,08 9627,69 -220.49 6890,39 4,94 -4,62 -1,75 5978176.99 590217,11 N 70,35012614 W 149,26754014 11994.11 85,60 136,26 4549.38 4628.08 5451,07 9658,86 -242,91 6912.04 2.78 -2.18 1,73 5978154,82 590239.00 N 70,35006486 W 149,26736455 12026.45 86,11 137,81 4551,72 4630.42 5483.08 9691.11 -266,51 6934.02 5.03 1.58 4,79 5978131,47 590261.24 N 70,35000033 W 149,26718628 12057,89 87,69 139,62 4553.42 4632,12 5514,11 9722,50 -290,10 6954,73 7,64 5,03 5.76 5978108.12 590282,21 N 70,34993583 W 149,26701832 12088,96 89.61 140,64 4554.15 4632.85 5544.68 9753.56 -313.94 6974.64 7.00 6,18 3,28 5978084,50 590302.39 N 70,34987066 W 149,26685687 12120,20 91,39 142,38 4553,88 4632,58 5575,29 9784,80 -338,39 6994,09 7,97 5,70 5.57 5978060,27 590322,10 N 70,34980382 W 149,26669924 12151,36 90,50 141,75 4553,37 4632,07 5605,76 9815,96 -362,96 7013,24 3,50 -2,86 -2.02 5978035,92 590341,52 N 70,34973664 W 149,26654395 12184.17 89,82 140.16 4553,28 4631.98 5637,97 9848,77 -388.44 7033,91 5.27 -2.07 -4,85 5978010,67 590362.47 N 70.34966697 W 149,26637637 12214.53 89,23 140.61 4553.53 4632,23 5667,83 9879,13 -411,83 7053,26 2,44 -1.94 1.48 5977987,50 590382,08 N 70,34960303 W 149,26621941 12244,70 89.34 139,09 4553,90 4632.60 5697,55 9909,29 -434,88 7072,71 5,05 0.36 -5,04 5977964,66 590401,79 N 70,34953999 W 149,26606169 12276.71 90,13 140.15 4554,05 4632,75 5729.11 9941.30 -459.27 7093.45 4.13 2.47 3.31 5977940.51 590422,79 N 70,34947332 W 149,26589354 12307,18 92.22 137.75 4553,43 4632.13 5759.20 9971.76 -482.24 7113.45 10.44 6,86 -7.88 5977917,77 590443.05 N 70.34941052 W 149,26573134 12337,88 90.95 136.14 4552.58 4631.28 5789,66 10002.45 -504.66 7134.40 6.68 -4.14 -5,24 5977895,58 590464.24 N 70,34934921 W 149,26556145 12369,27 91,08 136.89 4552,02 4630,72 5820,84 10033,84 -527.43 7156,00 2.42 0.41 2,39 5977873,06 590486.09 N 70.34928694 W 149.26538631 12399,96 90.43 137.44 4551,62 4630,32 5851,29 10064.52 -549,94 7176,87 2,77 -2,12 1,79 5977850,79 590507.20 N 70,34922541 W 149,26521712 12430.08 88,72 134.74 4551,84 4630,54 5881,24 10094,64 -571,63 7197,75 10.61 -5,68 -8,96 5977829,33 590528.33 N 70.34916608 W 149,26504775 12461.86 88,79 133,31 4552,53 4631,23 5912,93 10126.42 -593.71 7220,60 4,50 0.22 -4.50 5977807.50 590551.41 N 70,34910570 W 149.26486248 12494.10 89.75 130,05 4552,94 4631.64 5945,15 10158,65 -615.15 7244,67 10.54 2.98 -10,11 5977786,34 590575,72 N 70,34904709 W 149,26466723 12524.92 89,03 130.17 4553.27 4631,97 5975.97 10189.47 -635.00 7268,24 2,37 -2.34 0.39 5977766,75 590599.51 N 70,34899278 W 149,26447606 SurveyEditor Ver 3,1 RT-SP3,03-HF4,OO Bld( do31 rt-546 ) N-U\L-201\L-201 L 1\L-201 L 1 Generated 4/30/2004 2:14 PM Page 4 of 5 ) ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/1 00 ft ) (ftUS) (ftUS) 12556.16 89.89 127,82 4553,56 4632,26 6007.20 10220.71 -654,66 7292,52 8.01 2.75 -7,52 5977747,37 590624.00 N 70,34893902 W 149,26427915 12587.55 88.24 125.67 4554.08 4632,78 6038,53 10252,09 -673.43 7317,66 8,63 -5,26 -6,85 5977728,88 590649,35 N 70.34888766 W 149,26407517 12619,29 87.07 125.12 4555,38 4634.08 6070.14 10283,81 -691,80 7343.52 4.07 -3.69 -1.73 5977710.80 590675.40 N 70.34883741 W 149.26386547 12649,85 86.73 121.21 4557,03 4635,73 6100.43 10314,32 -708.49 7369,06 12.82 -1,11 -12,79 5977694.40 590701,12 N 70,34879175 W 149,26365830 12679.55 86.35 120.06 4558,82 4637.52 6129,68 10343,97 -723,60 7394,56 4,07 -1,28 -3,87 5977679,58 590726,80 N 70.34875041 W 149,26345136 12711,28 86.15 119,79 4560,90 4639.60 6160.86 10375,63 -739,39 7422,00 1.06 -0.63 -0.85 5977664,09 590754.41 N 70,34870718 W 149,26322874 12741.92 85.90 119.47 4563,02 4641.72 6190,92 10406,20 -754.50 7448,57 1,32 -0,82 -1,04 5977649,27 590781,14 N 70.34866583 W 149,26301320 12772,92 87,93 118,89 4564.69 4643.39 6221,33 10437,15 -769.59 7475.60 6,81 6,55 -1.87 5977634.49 590808,33 N 70,34862453 W 149,26279395 12804.48 88.31 118.02 4565.72 4644.42 6252.23 10468,69 -784,62 7503,33 3.01 1,20 -2,76 5977619.77 590836.23 N 70,34858339 W 149,26256896 12835.21 87.90 116.82 4566,74 4645.44 6282,21 10499.40 -798,77 7530,59 4,12 -1,33 -3,91 5977605,93 590863,64 N 70,34854468 W 149.26234778 12866,50 87,55 118.42 4567.98 4646.68 6312,74 10530,67 -813,26 7558.29 5.23 -1.12 5.11 5977591,75 590891.50 N 70.34850501 W 149,26212304 12898,51 87,31 118.35 4569.42 4648.12 6344,07 10562,65 -828.46 7586.43 0,78 -0,75 -0.22 5977576.86 590919,80 N 70,34846340 W 149,26189481 12929.86 87,21 117,92 4570,92 4649,62 6374,71 10593,96 -843.23 7614,04 1.41 -0,32 -1,37 5977562.40 590947,57 N 70.34842298 W 149.26167078 12960,59 87.90 118,52 4572.23 4650.93 6404.77 10624,66 -857,75 7641,09 2,97 2,25 1.95 5977548,19 590974,78 N 70,34838325 W 149,26145131 12991,92 87.11 117.34 4573,59 4652,29 6435,37 10655,96 -872.41 7668,75 4,53 -2,52 -3,77 5977533.84 591002.59 N 70,34834312 W 149,26122696 13023.23 87.45 117,92 4575,08 4653,78 6465.92 10687,24 -886,91 7696.46 2,15 1,09 1.85 5977519,64 591030.46 N 70.34830342 W 149,26100217 13054,15 89.10 120.42 4576,01 4654,71 6496.27 10718.14 -901,97 7723.44 9.68 5,34 8,09 5977504,88 591057.60 N 70,34826219 W 149,26078327 13084.40 89.47 120,63 4576,39 4655,09 6526.11 10748,39 -917,34 7749.49 1.41 1.22 0.69 5977489.81 591083,83 N 70.34822015 W 149,26057190 13115,86 88.79 122,02 4576.86 4655.56 6557.21 10779,85 -933.69 7776.36 4,92 -2.16 4.42 5977473,76 591110,87 N 70,34817540 W 149.26035393 13146.46 87.48 119,53 4577,86 4656,56 6587.39 10810.43 -949.34 7802,64 9,19 -4,28 -8,14 5977458.41 591137.32 N 70,34813258 W 149,26014080 13177.88 87.83 119,79 4579,14 4657,84 6618,27 10841,82 -964,87 7829,92 1,39 1,11 0,83 5977443,18 591164,77 N 70.34809006 W 149,25991950 13208,91 88.55 120.17 4580,12 4658,82 6648.82 10872.84 -980,37 7856,78 2.62 2.32 1,22 5977427,98 591191.80 N 70,34804764 W 149,25970157 13240,02 88.27 119,66 4580,99 4659,69 6679.43 10903,94 -995.88 7883,74 1,87 -0,90 -1,64 5977412.77 591218,92 N 70,34800520 W 149,25948291 13271,54 87.42 118,99 4582.17 4660,87 6710,38 10935.43 -1011.31 7911.20 3.43 -2.70 -2.13 5977397,66 591246,55 N 70.34796297 W 149,25926014 13302,99 89.10 120.67 4583,13 4661,83 6741.32 10966.87 -1026.94 7938.47 7.55 5.34 5,34 5977382,32 591273.99 N 70,34792018 W 149,25903893 13333.78 89.92 121.86 4583,39 4662,09 6771,76 10997,66 -1042,92 7964,78 4,69 2,66 3,86 5977366.64 591300.48 N 70,34787645 W 149,25882546 13365.40 89.58 120.94 4583,53 4662,23 6803.02 11029.28 -1059,39 7991,77 3.10 -1,08 -2,91 5977350.47 591327.65 N 70,34783137 W 149.25860653 13396.71 89.17 121.08 4583,87 4662,57 6833,94 11060,58 -1075,52 8018,61 1,38 -1,31 0.45 5977334,64 591354,65 N 70,34778722 W 149,25838887 13427,23 88.89 121,75 4584,39 4663.09 6864.12 11091,10 -1091.43 8044.65 2,38 -0.92 2.20 5977319,03 591380,87 N 70,34774369 W 149,25817762 13458.53 88.55 121.86 4585,09 4663,79 6895,09 11122.39 -1107,92 8071.24 1.14 -1,09 0,35 5977302,83 591407.64 N 70,34769856 W 149.25796191 13488,53 89,27 124,04 4585,66 4664,36 6924,85 11152,39 -1124,23 8096.41 7,65 2.40 7,27 5977286,80 591432,99 N 70,34765392 W 149,25775777 13540.00 89.27 124.04 4586,31 4665,01 6976,04 11203.85 -1153,04 8139,06 0.00 0,00 0,00 5977258.47 591475,95 N 70,34757509 W 149.25741187 Legal Description: Northing (V) rftUSl Eastlng (X) fftUSl Surface: 2597 FSL 3588 FEL S34 T12N R11 E UM 5978320.84 583325,34 BHL: 1440 FSL 732 FEL S35 T12N R11E UM 5977258.47 591475,95 SurveyEditor Ver 3,1 RT-SP3.03-HF4,OO Bld( do31 rt-546 ) N-U\L-201\L-201 L 1\L-201 L 1 Generated 4/30/2004 2:14 PM Page 5 of 5 ) ) Õ L-201 L 1 PB1 S R rtSChlumberger urvey epo Report Date: 11-Apr-04 Survey I DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 130,000- Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0,000 ft, E 0,000 ft Structure I Slot: L-PAD 1 N-U TVD Reference Datum: Rotary Table Well: L·201 TVD Reference Elevation: 78.70 1'1 relative to MSL Borehole: L-201L1PB1 Sea Bed I Ground Level Elevation: 50.201'1 relative to MSL UWIIAPI#: 500292320272 Magnetic Declination: 25,007° Survey Name I Date: L-201 L 1 PB11 April 11 , 2004 Total Field Strength: 57560.792 nT Torti AHD I DDII ERD ratio: 438.907° 19836.75 1'1/7,055/2.127 Magnetic Dip: 80,823° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 06, 2004 Location Lat/Long: N 70,35073717, W 149.32347531 Magnetic Declination Model: BGGM 2003 Location Grid NIE Y/x: N 5978320,840 ftUS, E 583325.340 ftUS North Reference: True North Grid Convergence Angle: -+0.63713312° Total Corr Mag North -> True North: +25.007° Grid Scale Factor: 0,99990789 Local Coordinates Referenced To: Well Head Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( degl100 ft ) ( deg/100 ft ) ( deg/1 00 ft ) (ftUS) (ftUS) 0,00 0.00 0.00 -78.70 0,00 0,00 0,00 0,00 0.00 0.00 0,00 0.00 5978320.84 583325.34 N 70.35073717 W 149,32347531 124,00 0.22 237,38 45.30 124,00 -0,07 0,24 -0.13 -0.20 0,18 0,18 0,00 5978320,71 583325.14 N 70,35073682 W 149.32347694 224.00 0.52 340,14 145,30 224.00 -0,52 0,75 0,19 -0,52 0.61 0.30 102.76 5978321,03 583324,82 N 70,35073770 W 149,32347951 324,00 2.13 19.40 245.27 323,97 -1,57 3.00 2,37 -0.05 1,76 1,61 39.26 5978323.21 583325,26 N 70.35074366 W 149,32347575 395,00 4.15 21,01 316,16 394,86 -2,87 6,89 6,02 1,31 2,85 2,85 2,27 5978326,87 583326.58 N 70,35075361 W 149,32346471 495,00 5.88 17.19 415.77 494.47 -6,03 15.63 14,29 4.12 1.76 1,73 -3.82 5978335.17 583329.30 N 70,35077621 W 149,32344189 595,00 8.86 11.46 514,94 593.64 -11 .70 28.45 26.73 7.16 3,07 2,98 -5.73 5978347,65 583332.20 N 70,35081020 W 149,32341717 695.00 11,87 12.48 613,29 691,99 -20,13 46.44 44,33 10,92 3,02 3.01 1,02 5978365.28 583335,76 N 70,35085827 W 149,32338670 758,99 14.48 14.62 675.59 754,29 -26.60 61.02 58,50 14.36 4,15 4,08 3,34 5978379.49 583339.05 N 70,35089697 W 149,32335876 853,05 17,37 16,52 766,04 844.74 -37,24 86.82 83.34 21,32 3,12 3,07 2,02 5978404.41 583345,73 N 70,35096485 W 149,32330224 947.46 19.62 16.37 855.56 934,26 -49.21 116.77 112,06 29.80 2,38 2,38 -0.16 5978433,22 583353.88 N 70.35104332 W 149,32323343 1040,82 22,84 16,89 942,58 1021.28 -62,61 150,57 144.45 39.48 3.45 3.45 0,56 5978465,71 583363,21 N 70,35113179 W 149,32315481 1132,91 25.75 16,87 1026,50 1105,20 -77.48 188.45 180.70 50.48 3.16 3.16 -0,02 5978502.07 583373,80 N 70,35123083 W 149.32306550 1226.13 27.99 17.46 1109,65 1188,35 -93.82 230,58 220,95 62.92 2.42 2.40 0,63 5978542.46 583385.79 N 70.35134079 W 149,32296450 1321,50 29,42 18,07 1193,30 1272.00 -111,15 276,39 264.57 76.90 1,53 1.50 0,64 5978586,22 583399,29 N 70,35145995 W 149,32285099 1416,81 31.11 18.21 1275,62 1354.32 -129.04 324.42 310,22 91,86 1,77 1,77 0.15 5978632.03 583413.74 N 70.35158465 W 149.32272956 1511,08 32.79 18,97 1355,60 1434,30 -147,24 374,31 357.49 107,77 1,83 1.78 0,81 5978679.48 583429,12 N 70,35171381 W 149.32260040 1604,81 34.13 19.21 1433.80 1512,50 -165,68 425,98 406.33 124.67 1.44 1.43 0.26 5978728.49 583445.47 N 70,35184722 W 149.32246316 1699,54 33,73 19.32 1512.40 1591,10 -184.40 478.86 456,24 142,12 0.43 -0.42 0,12 5978778,59 583462,36 N 70.35198358 W 149,32232152 1797,56 36.27 18,62 1592,68 1671,38 -204,58 535,08 509.41 160.38 2,62 2.59 -0,71 5978831.96 583480,03 N 70,35212883 W 149,32217323 1892,80 37.18 18,91 1669,02 1747.72 -225,21 592,03 563,33 178,70 0,97 0,96 0,30 5978886,07 583497,75 N 70,35227614 W 149,32202448 1988,07 39.87 19.15 1743.55 1822,25 -246.44 651,36 619.42 198.05 2.83 2.82 0,25 5978942.37 583516.48 N 70.35242937 W 149,32186737 2081,93 41.57 20,11 1814,68 1893,38 -267.74 712.59 677,09 218.63 1,93 1,81 1,02 5979000,26 583536.41 N 70.35258691 W 149,32170029 2175,78 42.75 19,75 1884,25 1962.95 -289,36 775,58 736.31 240.10 1.28 1.26 -0,38 5979059.70 583557,22 N 70,35274869 W 149,32152597 2269,96 45,03 20,88 1952.12 2030,82 -311.34 840,87 797,53 262,78 2.56 2.42 1.20 5979121.17 583579,21 N 70.35291593 W 149.32134182 2361,74 45.50 21,16 2016,71 2095.41 -332,55 906,07 858,39 286.17 0,56 0.51 0,31 5979182.28 583601,92 N 70,35308219 W 149,32115193 2458.33 47.95 21.23 2082,92 2161,62 -355.21 976.38 923,95 311,59 2,54 2,54 0,07 5979248,11 583626.61 N 70.35326130 W 149.32094549 2552,24 48.94 21,51 2145,22 2223.92 -377,66 1046,66 989.39 337,20 1,08 1.05 0,30 5979313,83 583651.48 N 70,35344008 W 149,32073755 2645,64 49,74 21.45 2206,07 2284,77 -400,17 1117,51 1055,32 363,14 0.86 0,86 -0.06 5979380.04 583676,69 N 70,35362019 W 149,32052688 2740,10 50.69 21,63 2266,52 2345,22 -423.15 1190.10 1122.84 389,79 1,02 1,01 0.19 5979447,84 583702.59 N 70,35380464 W 149.32031046 2834.26 50.10 21,09 2326,54 2405,24 -446,34 1262.64 1190.40 416,22 0,77 -0,63 -0,57 5979515.68 583728,26 N 70.35398921 W 149.32009588 2928,38 49.29 22,08 2387.43 2466.13 -469,01 1334.42 1257.15 442,62 1,18 -0,86 1,05 5979582.71 583753,91 N 70,35417154 W 149,31988149 3022,90 49,04 23,22 2449,23 2527.93 -490,34 1405,93 1323,14 470,16 0.95 -0,26 1.21 5979649.00 583780,71 N 70.35435183 W 149,31965786 3117.47 48.89 23,30 2511,32 2590,02 -510.89 1477.27 1388.68 498,33 0,17 -0,16 0,08 5979714,84 583808.15 N 70,35453086 W 149.31942910 3152,16 49,11 23,20 2534,08 2612.78 -518.43 1503.45 1412.73 508.66 0,67 0.63 -0,29 5979739.01 583818,21 N 70,35459658 W 149,31934517 3266.50 47.43 25.10 2610.19 2688,89 -541.75 1588.77 1490.59 543,55 1,92 -1.47 1,66 5979817,25 583852.23 N 70.35480928 W 149,31906183 3325,61 49,36 23,06 2649.43 2728.13 -553,88 1632.97 1530.95 561.57 4,16 3,27 -3.45 5979857.79 583869.80 N 70.35491951 W 149,31891549 3420.36 50,09 23,79 2710,69 2789,39 -574.50 1705.25 1597,27 590,31 0,97 0,77 0,77 5979924.43 583897.80 N 70.35510071 W 149,31868208 3515,35 49,54 23.70 2771.98 2850.68 -594.82 1777.82 1663,70 619,53 0,58 -0,58 -0,09 5979991.17 583926,28 N 70,35528217 W 149,31844476 3609.16 49,34 23,32 2832,98 2911,68 -615.05 1849,09 1729,05 647,96 0.37 -0,21 -0.41 5980056,83 583953.98 N 70,35546071 W 149,31821387 3701,35 50,03 21,52 2892,63 2971,33 -636,28 1919,38 1794,03 674,77 1.67 0.75 -1,95 5980122.09 583980,05 N 70,35563821 W 149,31799618 3794.96 50,31 21,39 2952.59 3031,29 -659,14 1991,27 1860,94 701,06 0,32 0,30 -0,14 5980189.28 584005.60 N 70,35582099 W 149,31778262 3888.81 50.23 21.33 3012.57 3091,27 -682,21 2063.45 1928.16 727,35 0.10 -0,09 -0,06 5980256.78 584031,14 N 70,35600462 W 149.31756910 3982.46 49,83 20,65 3072,73 3151.43 -705,59 2135.22 1995,16 753,06 0,70 -0.43 -0.73 5980324,07 584056.10 N 70,35618767 W 149,31736028 4076.83 49,57 20,57 3133.77 3212,47 -729.49 2207,19 2062.53 778.39 0,28 -0,28 -0,08 5980391.70 584080,68 N 70.35637170 W 149,31715449 4172.21 49,68 19.90 3195.56 3274.26 -754.06 2279.86 2130.71 803,52 0.55 0,12 -0,70 5980460,15 584105.05 N 70,35655795 W 149,31695036 4266,06 48,39 21.00 3257,08 3335,78 -777.78 2350.72 2197,11 828,28 1.63 -1,37 1,17 5980526.82 584129,06 N 70,35673934 W 149,31674930 4360,01 47.90 21,14 3319,77 3398.47 -800.48 2420,70 2262.41 853.43 0,53 -0.52 0.15 5980592,38 584153.49 N 70,35691772 W 149.31654495 4454,28 47,80 22.75 3383.03 3461,73 -822.14 2490,59 2327,23 879,55 1.27 -0,11 1.71 5980657.49 584178,88 N 70.35709480 W 149,31633280 4548.11 48,18 26,94 3445.85 3524.55 -840,35 2560,29 2390.47 908.84 3.34 0.40 4.47 5980721,04 584207.46 N 70,35726755 W 149,31609491 4641.89 48,96 31.87 3507,92 3586.62 -853,25 2630,58 2451,68 943.36 4.03 0,83 5,26 5980782.62 584241,29 N 70,35743475 W 149,31581454 4735,40 48,79 36.31 3569,44 3648.14 -860,51 2701.01 2509.98 982.82 3.58 -0,18 4,75 5980841.36 584280.10 N 70.35759404 W 149,31549403 4829,57 48,97 40,88 3631.39 3710,09 -862,24 2771,93 2565.40 1027,05 3,66 0,19 4,85 5980897.26 584323,71 N 70.35774541 W 149,31513475 4923.41 48,83 47.15 3693.11 3771.81 -857,30 2842.62 2616,21 1076.14 5,04 -0.15 6.68 5980948,61 584372.22 N 70,35788420 W 149.31473606 SurveyEditor Ver 3,1 RT-SP3,03-HF4,OO Bld( d031rt-546 ) N-U\L-201\L-201 L 1 PB1\L-201 L 1 PB1 Generated 4/30/2004 2:25 PM Page 1 of 4 ) ) Measured Inclination AzImuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/1 00 ft ) (ftUS) (ftUS) 5016.44 49,09 54.19 3754,24 3832,94 -844,31 2912.75 2660.62 1130,36 5,71 0,28 7,57 5980993,62 584425,94 N 70,35800551 W 149,31429571 5110,60 48.23 58.33 3816.45 3895,15 -824.54 2983.43 2699,89 1189,11 3.42 -0,91 4.40 5981033,53 584484,25 N 70,35811275 W 149,31381851 5204,87 49,16 62,86 3878.69 3957,39 -799,63 3054,23 2734,62 1250,78 3,74 0,99 4,81 5981068,94 584545.52 N 70.35820761 W 149.31331763 5298.92 47.75 68.46 3941,09 4019.79 -769,20 3124,59 2763,65 1314,85 4,70 -1,50 5,95 5981098,67 584609,26 N 70,35828687 W 149,31279728 5392,93 49,39 73.49 4003.32 4082,02 -732,92 3195.05 2786.57 1381.46 4.37 1.74 5.35 5981122.34 584675,60 N 70,35834947 W 149.31225633 5487,16 51.11 80,03 4063.61 4142,31 -689,56 3267.47 2803,10 1451,92 5,64 1,83 6,94 5981139,64 584745.86 N 70.35839458 W 149,31168408 5582.88 53.94 84,88 4121.86 4200,56 -638,27 3343.41 2813,00 1527,19 4,99 2,96 5,07 5981150.39 584821.01 N 70,35842161 W 149,31107280 5677,97 56.15 89.22 4176,36 4255,06 -581.23 3421,33 2816,97 1604,99 4.40 2.32 4,56 5981155,22 584898,75 N 70.35843241 W 149,31044097 5769,98 58.26 91,53 4226,20 4304,90 -521,65 3498,66 2816.45 1682,32 3.12 2,29 2,51 5981155,56 584976,08 N 70,35843093 W 149.30981296 5862.16 59.02 94,81 4274,18 4352,88 -458,65 3577.37 2812,09 1760,89 3,15 0,82 3,56 5981152.07 585054,69 N 70,35841896 W 149,30917484 5955.46 61.37 98.97 4320,56 4399.26 -390,85 3658,32 2802.35 1841,23 4.62 2.52 4.46 5981143.22 585135.12 N 70,35839229 W 149.30852243 6049,62 64.61 102.59 4363,33 4442.03 -317,64 3742.19 2786,62 1923.60 4,85 3.44 3,84 5981128.42 585217,66 N 70,35834929 W 149,30785351 6143,03 65.95 107,59 4402.41 4481,11 -240,71 3827,03 2764.52 2005.48 5.07 1.43 5,35 5981107.23 585299.77 N 70,35828886 W 149,30718859 6237,33 68.65 110.96 4438.81 4517,51 -159,36 3914,01 2735,79 2087,57 4,37 2,86 3,57 5981079.42 585382,17 N 70,35821030 W 149,30652201 6330,67 72.77 113,73 4469,64 4548,34 -75.43 4002,09 2702,28 2169,02 5.23 4.41 2.97 5981046,82 585463,97 N 70,35811869 W 149.30586065 6372.00 74.45 114,96 4481.31 4560,01 -37,25 4041,74 2685,94 2205,14 4,97 4,06 2,98 5981030.88 585500,27 N 70,35807401 W 149,30556734 6384,00 76.22 115,73 4484.34 4563,04 -26,02 4053,35 2680,97 2215,63 16,00 14,75 6.42 5981026.03 585510,82 N 70,35806043 W 149,30548216 6404,88 78,82 115.47 4488,86 4567.56 -6,28 4073.73 2672.16 2234,02 12.51 12,45 -1,25 5981017.42 585529,30 N 70,35803635 W 149.30533288 6436,12 81.44 115,09 4494.21 4572,91 23.49 4104,51 2659.02 2261.84 8.47 8,39 -1,22 5981004,59 585557,27 N 70,35800042 W 149.30510693 6467.35 85,08 114.71 4497.87 4576,57 53.43 4135.52 2645,96 2289,97 11,72 11,66 -1,22 5980991.85 585585.53 N 70,35796473 W 149,30487854 6498,50 89,31 114,33 4499.40 4578,10 83.40 4166,62 2633,05 2318.27 13,63 13.58 -1.22 5980979,26 585613,97 N 70,35792944 W 149.30464875 6530.44 90,86 113.95 4499,35 4578.05 114.13 4198.56 2619,99 2347.42 5,00 4,85 -1.19 5980966,52 585643,26 N 70,35789374 W 149,30441209 6561,55 92,09 113,58 4498.55 4577.25 143,98 4229,66 2607.46 2375,88 4.13 3,95 -1,19 5980954.31 585671.86 N 70.35785947 W 149,30418099 6592.41 93.09 113.22 4497,16 4575,86 173,53 4260.49 2595,22 2404.17 3.44 3,24 -1,17 5980942,38 585700,28 N 70,35782600 W 149,30395125 6624.01 90.26 112,85 4496,23 4574,93 203,74 4292,07 2582,86 2433,24 9.03 -8,96 -1.17 5980930.35 585729.48 N 70,35779221 W 149.30371526 6655,31 90.02 113.77 4496,16 4574,86 233,72 4323,37 2570.47 2461.98 3,04 -0,77 2,94 5980918.29 585758,36 N 70,35775835 W 149,30348185 6685,25 92.97 114.91 4495,38 4574,08 262,53 4353,30 2558,14 2489,25 10,56 9,85 3,81 5980906.26 585785,75 N 70.35772463 W 149,30326046 6716.74 90.67 113,70 4494,38 4573,08 292.83 4384.77 2545.19 2517.93 8,25 -7,30 -3.84 5980893,63 585814,58 N 70,35768922 W 149,30302757 6747.77 89.47 117,00 4494,34 4573,04 322,85 4415.80 2531,90 2545.97 11,32 -3,87 10,63 5980880.66 585842.76 N 70.35765290 W 149.30279992 6778,97 90.26 119.95 4494.41 4573,11 353.42 4447.00 2517.03 2573.39 9,79 2,53 9.46 5980866,09 585870,34 N 70,35761225 W 149,30257727 6809.74 91,32 122,81 4493,99 4572,69 383.83 4477,76 2501,01 2599,65 9,91 3.44 9,29 5980850.37 585896.78 N 70.35756846 W 149.30236403 6841.42 92.42 125,31 4492,95 4571,65 415,32 4509.43 2483,28 2625,88 8,62 3.47 7,89 5980832,93 585923.20 N 70.35751999 W 149.30215108 6872.99 92.45 123.71 4491,61 4570,31 446.72 4540.97 2465.41 2651,87 5,06 0,10 -5,07 5980815,35 585949,39 N 70,35747115 W 149.30194007 6903.56 90.22 122,19 4490,90 4569.60 477,04 4571,53 2448,79 2677,51 8,83 -7.29 -4,97 5980799,02 585975,21 N 70,35742572 W 149.30173188 6934.63 87,92 119.45 4491,40 4570,10 507.71 4602.59 2432.87 2704.19 11,51 -7.40 -8,82 5980783.40 586002,06 N 70,35738222 W 149,30151531 6966.17 89.98 121,64 4491,98 4570.68 538,81 4634,13 2416,85 2731.34 9,53 6,53 6,94 5980767,68 586029,39 N 70,35733841 W 149,30129483 6996.79 91.52 120,94 4491,58 4570,28 569.07 4664,74 2400,95 2757,51 5,52 5,03 -2,29 5980752,07 586055,72 N 70,35729495 W 149,30108242 7028,26 92.31 122.84 4490,53 4569,23 600,21 4696.19 2384,33 2784.21 6.54 2,51 6,04 5980735.76 586082,61 N 70,35724953 W 149.30086562 7057.40 92.97 122,97 4489,19 4567,89 629.10 4725,30 2368,52 2808,65 2,31 2,26 0.45 5980720,22 586107,22 N 70,35720630 W 149,30066720 7089.66 90,94 124,36 4488,09 4566,79 661,14 4757,54 2350,65 2835.48 7.62 -6,29 4,31 5980702,65 586134.24 N 70,35715745 W 149.30044936 7120,81 89.71 125.41 4487,91 4566,61 692.16 4788,69 2332,83 2861,03 5,19 -3.95 3.37 5980685,12 586159,99 N 70.35710876 W 149,30024193 7152,24 89.26 125.44 4488.19 4566,89 723.49 4820,12 2314.62 2886.64 1.43 -1.43 0.10 5980667,19 586185,80 N 70,35705896 W 149,30003401 7182.85 89.09 126.42 4488.63 4567.33 754,02 4850,73 2296,66 2911.43 3.25 -0,56 3,20 5980649.51 586210.78 N 70,35700987 W 149,29983281 7213.84 89.98 128.58 4488.88 4567,58 784.98 4881,72 2277. 79 2936,01 7,54 2.87 6,97 5980630,92 586235,57 N 70,35695831 W 149,29963324 7245.39 88.88 127,80 4489.20 4567,90 816,51 4913,26 2258,29 2960.81 4.27 -3.49 -2.47 5980611,70 586260.57 N 70,35690500 W 149,29943195 7276,71 88.20 128.13 4490.00 4568,70 847.80 4944,57 2239.03 2985.49 2.41 -2.17 1,05 5980592,71 586285.47 N 70,35685235 W 149,29923157 7306,90 88,02 128,77 4490,99 4569,69 877.96 4974,75 2220.26 3009.12 2,20 -0.60 2,12 5980574,22 586309,30 N 70,35680107 W 149,29903974 7338,68 90.74 130,58 4491,34 4570.04 909,73 5006,52 2199,98 3033,58 10.28 8.56 5.70 5980554,21 586333.98 N 70.35674562 W 149,29884121 7369,54 91,87 129.16 4490,63 4569,33 940.59 5037.37 2180.20 3057,25 5,88 3,66 -4,60 5980534,70 586357,88 N 70,35669157 W 149.29864900 7400,91 92.35 127,28 4489.48 4568.18 971,92 5068,72 2160,81 3081,88 6.18 1.53 -5.99 5980515,58 586382,72 N 70,35663856 W 149,29844908 7431,85 92,11 127,90 4488,27 4566,97 1002.81 5099,64 2141.95 3106,38 2,15 -0.78 2,00 5980496,99 586407.42 N 70,35658701 W 149.29825021 7463.94 92.11 125,69 4487,09 4565,79 1034.82 5131.71 2122.74 3132,06 6,88 0.00 -6,89 5980478,08 586433,31 N 70,35653451 W 149,29804176 7493,05 91.42 123,68 4486.20 4564.90 1063,79 5160.80 2106,19 3155,98 7.30 -2,37 -6.90 5980461,79 586457.41 N 70,35648925 W 149,29784754 7524,80 90.12 121,74 4485,77 4564.47 1095.28 5192,55 2089.03 3182,69 7,35 -4,09 -6,11 5980444,93 586484.31 N 70,35644236 W 149.29763070 7555,28 89,09 119,65 4485.98 4564.68 1125,36 5223,03 2073.47 3208.90 7.64 -3,38 -6.86 5980429,67 586510.68 N 70.35639983 W 149.29741794 7587.15 88.95 118,02 4486,52 4565,22 1156.62 5254.89 2058,11 3236,81 5.13 -0.44 -5.11 5980414.61 586538.76 N 70,35635781 W 149,29719133 7617,36 88,44 116,26 4487,21 4565,91 1186.06 5285.10 2044.33 3263,69 6,06 -1.69 -5,83 5980401.14 586565,79 N 70,35632014 W 149,29697314 7647,33 89,09 116.04 4487.86 4566,56 1215,15 5315,06 2031,12 3290.58 2.29 2,17 -0.73 5980388,23 586592.83 N 70,35628403 W 149.29675478 7677.57 89,60 114.59 4488,20 4566,90 1244.40 5345.30 2018.20 3317,92 5,08 1.69 -4,80 5980375.61 586620,30 N 70,35624868 W 149,29653287 7708,53 90,12 114,06 4488.28 4566,98 1274,21 5376,26 2005.44 3346,13 2.40 1,68 -1,71 5980363,17 586648,65 N 70.35621381 W 149.29630384 7739.39 90,12 115.48 4488,21 4566,91 1303.99 5407.12 1992,51 3374,15 4.60 0,00 4,60 5980350.56 586676,81 N 70,35617845 W 149,29607635 7769,77 90,15 114,37 4488,14 4566,84 1333.32 5437.50 1979.71 3401.70 3,66 0.10 -3.65 5980338.06 586704.50 N 70,35614344 W 149,29585269 7800.51 89,81 114,58 4488.15 4566,85 1362.94 5468,24 1966,98 3429.68 1,30 -1,11 0.68 5980325.64 586732.61 N 70,35610861 W 149,29562555 7830.73 89,57 114,06 4488,32 4567,02 1392,03 5498.46 1954.53 3457.21 1,90 -0,79 -1.72 5980313.50 586760,28 N 70,35607458 W 149,29540198 7860,94 89.91 113.75 4488.45 4567.15 1421.06 5528.67 1942.29 3484.83 1.52 1,13 -1,03 5980301.57 586788.03 N 70.35604110 W 149,29517776 7891.93 89.64 114.24 4488.58 4567,28 1450,85 5559,66 1929.69 3513,14 1,81 -0,87 1.58 5980289,29 586816.48 N 70,35600664 W 149,29494791 7922.42 87.99 113.27 4489,21 4567,91 1480.11 5590.14 1917.41 3541,04 6,28 -5.41 -3.18 5980277,32 586844,51 N 70.35597306 W 149,29472141 7952,82 86.82 111.52 4490.58 4569,28 1509.06 5620,51 1905,84 3569.12 6,92 -3.85 -5,76 5980266,06 586872,71 N 70.35594141 W 149.29449347 7983.67 89,33 113,81 4491,62 4570,32 1538.48 5651.34 1893.96 3597,57 11,01 8,14 7.42 5980254,50 586901,29 N 70.35590892 W 149.29426252 8014.45 91,08 114.14 4491.51 4570.21 1568.07 5682,11 1881.45 3625,69 5,79 5.69 1.07 5980242.31 586929.55 N 70,35587472 W 149.29403421 8045.57 91.25 112,93 4490,88 4569,58 1597,90 5713,23 1869,03 3654,22 3,93 0.55 -3.89 5980230.21 586958.20 N 70.35584074 W 149.29380263 SurveyEditor Ver 3.1 RT -SP3,03-HF4,OO Bld( d031 rt-546 ) N-U\L-201 \L-201 L 1 PB1\L-201 L 1 PB1 Generated 4/30/2004 2:25 PM Page 2 of 4 ) ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Wal k Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/100 ft ) (ftUS) (ftUS) 8076,05 91.11 112,84 4490,25 4568,95 1627,03 5743,70 1857,18 3682.29 0,55 -0.46 -0,30 5980218,67 586986.41 N 70,35580833 W 149,29357471 8106.65 90.56 113,29 4489,80 4568.50 1656,30 5774,30 1845.19 3710.44 2,32 -1.80 1.47 5980207,00 587014,69 N 70,35577554 W 149,29334617 8137,26 91.01 114,11 4489,38 4568,08 1685.67 5804.90 1832.89 3738.47 3,06 1.47 2,68 5980195,01 587042,84 N 70.35574189 W 149.29311865 8168,01 90.87 112,06 4488,88 4567,58 1715,09 5835,65 1820,83 3766.75 6,68 -0.46 -6,67 5980183.27 587071.26 N 70,35570892 W 149.29288904 8199,28 89.36 109,99 4488,82 4567,52 1744,66 5866,92 1809,61 3795,94 8,19 -4,83 -6,62 5980172,38 587100.56 N 70,35567824 W 149,29265210 8229.84 89.30 108,59 4489,17 4567.87 1773,24 5897.48 1799,52 3824,78 4.59 -0,20 -4,58 5980162,61 587129.51 N 70,35565062 W 149,29241795 8260,46 88.75 106,32 4489,69 4568,39 1801.51 5928.09 1790.34 3853,98 7,63 -1,80 -7.41 5980153.75 587158,81 N 70,35562549 W 149.29218085 8291,36 89.43 107.50 4490.19 4568.89 1829,93 5958,99 1781,35 3883.54 4.41 2,20 3,82 5980145.09 587188.47 N 70,35560090 W 149,29194086 8323,15 90.67 108.12 4490,16 4568.86 1859,37 5990,78 1771,63 3913,81 4,36 3.90 1,95 5980135,71 587218.84 N 70,35557429 W 149,29169514 8354,13 90.56 107,75 4489,83 4568,53 1888.08 6021,76 1762,09 3943,28 1,25 -0,36 -1.19 5980126.50 587248,41 N 70.35554819 W 149,29145587 8384,87 90.12 107.21 4489,64 4568,34 1916.47 6052.50 1752,85 3972.60 2,27 -1.43 -1,76 5980117,59 587277.83 N 70,35552292 W 149,29121783 8415,30 88.47 106.43 4490,02 4568,72 1944.44 6082,92 1744,05 4001,72 6.00 -5.42 -2,56 5980109.11 587307.05 N 70,35549883 W 149,29098138 8447.69 89.36 107.40 4490.63 4569.33 1974,23 6115,31 1734.63 4032,71 4.06 2,75 2,99 5980100,04 587338,13 N 70.35547304 W 149,29072984 8478,65 90.70 109,62 4490,61 4569,31 2003,04 6146,27 1724,80 4062,06 8,38 4,33 7,17 5980090,54 587367,59 N 70,35544615 W 149,29049151 8509,62 92,66 110.01 4489,71 4568.41 2032,09 6177,22 1714,31 4091.18 6.45 6,33 1,26 5980080.37 587396,82 N 70,35541744 W 149,29025509 8541,08 92,86 109,90 4488,19 4566,89 2061.61 6208.64 1703.58 4120.72 0.73 0,64 -0,35 5980069.97 587426.48 N 70.35538810 W 149.29001530 8571.91 92.72 108.98 4486,69 4565.39 2090.44 6239.44 1693,33 4149.76 3,01 -0.45 -2.98 5980060,05 587455,62 N 70,35536006 W 149,28977956 8603.14 92.18 110.47 4485.36 4564,06 2119,71 6270,64 1682,80 4179,13 5,07 -1.73 4,77 5980049,85 587485,11 N 70,35533125 W 149,28954113 8634.38 88,92 109.35 4485,06 4563,76 2149,05 6301,87 1672,17 4208.49 11.03 -10.44 -3,59 5980039.54 587514,59 N 70.35530214 W 149,28930272 8665.48 87.30 109,79 4486,08 4564.78 2178,17 6332,96 1661,76 4237,78 5.40 -5,21 1.41 5980029.46 587543.98 N 70,35527365 W 149,28906496 8696.92 87.07 109.71 4487,63 4566,33 2207,63 6364,36 1651,15 4267.34 0,77 -0,73 -0,25 5980019,18 587573,65 N 70,35524462 W 149.28882503 8728,38 87.00 109,56 4489.25 4567.95 2237.09 6395,78 1640.59 4296,93 0,53 -0,22 -0.48 5980008,95 587603.36 N 70,35521573 W 149,28858480 8759.09 87.37 109.85 4490,76 4569.46 2265,86 6426.45 1630.25 4325.80 1.53 1.20 0,94 5979998.93 587632,34 N 70.35518743 W 149,28835038 8791,07 87.13 110.95 4492,30 4571.00 2295,95 6458,39 1619,11 4355.74 3,52 -0,75 3.44 5979988,13 587662.40 N 70,35515697 W 149,28810733 8822.42 85.45 113.38 4494,32 4573,02 2325.73 6489.67 1607.31 4384,71 9.41 -5.36 7,75 5979976.65 587691,50 N 70.35512468 W 149,28787216 8853,19 85.21 111,55 4496.83 4575.53 2354,97 6520.34 1595,59 4413,05 5,98 -0.78 -5.95 5979965,25 587719.96 N 70,35509262 W 149,28764210 8884.30 84.80 111.59 4499,54 4578,24 2384,37 6551,33 1584,20 4441.87 1,32 -1,32 0,13 5979954.18 587748,91 N 70,35506145 W 149.28740813 8916,32 84.62 112,56 4502.49 4581,19 2414.71 6583,22 1572,22 4471.42 3,07 -0,56 3.03 5979942,53 587778.58 N 70,35502867 W 149.28716828 8946.42 85,04 114.27 4505.20 4583,90 2443.43 6613.20 1560.30 4498.93 5,83 1.40 5,68 5979930,92 587806,22 N 70.35499608 W 149,28694498 8978,21 86.24 116,51 4507,62 4586,32 2474,10 6644,89 1546.71 4527,56 7.98 3,77 7.05 5979917,65 587835,00 N 70,35495890 W 149,28671255 9009.58 89.09 119.57 4508,90 4587,60 2504,76 6676,23 1531,98 4555.22 13.32 9,09 9.75 5979903.23 587862,81 N 70,35491861 W 149,28648804 9041,71 90,63 118,97 4508.98 4587.68 2536,33 6708,36 1516.27 4583,25 5,14 4,79 -1,87 5979887,84 587891.01 N 70,35487565 W 149.28626055 9072.65 90.43 118.64 4508,69 4587,39 2566.68 6739.30 1501,37 4610.36 1.25 -0.65 -1.07 5979873,23 587918,28 N 70.35483488 W 149,28604050 9103,96 88,06 119,27 4509,10 4587,80 2597.40 6770,61 1486,21 4637,75 7,83 -7.57 2.01 5979858,38 587945,84 N 70,35479343 W 149,28581816 9134,01 87,17 119.06 4510.35 4589,05 2626.89 6800.63 1471.58 4663.96 3,04 -2.96 -0,70 5979844,05 587972,22 N 70.35475342 W 149.28560536 9165.46 88.61 123,39 4511.51 4590.21 2657,94 6832.06 1455.29 4690.83 14,50 4.58 13,77 5979828,06 587999.26 N 70,35470887 W 149.28538728 9197.72 89.09 123.47 4512.16 4590,86 2689,99 6864,31 1437,52 4717,75 1.51 1.49 0.25 5979810.59 588026,37 N 70,35466028 W 149,28516881 9227,58 89,19 124,58 4512.61 4591,31 2719,68 6894,17 1420,81 4742.50 3,73 0.33 3.72 5979794,16 588051,30 N 70,35461460 W 149,28496798 9257.44 90.32 126.34 4512,74 4591 .44 2749.45 6924,03 1403.49 4766,82 7.00 3,78 5.89 5979777,12 588075,81 N 70,35456723 W 149.28477059 9289,25 91,73 124,85 4512.17 4590,87 2781.15 6955,83 1384,98 4792.68 6.45 4.43 -4.68 5979758,89 588101.87 N 70,35451662 W 149,28456071 9320.84 91,70 125.41 4511,22 4589,92 2812,62 6987,41 1366,81 4818,50 1,77 -0.09 1.77 5979741.02 588127,89 N 70,35446694 W 149,28435113 9351,30 89.71 124,79 4510,85 4589.55 2842.96 7017.86 1349.30 4843.42 6,84 -6.53 -2,04 5979723,78 588153.00 N 70.35441905 W 149,28414890 9383.28 89.06 121.44 4511,19 4589,89 2874,70 7049,84 1331,83 4870,20 10.67 -2.03 -10.48 5979706.61 588179,97 N 70.35437128 W 149.28393155 9415,66 88.64 119,19 4511.84 4590.54 2906.61 7082,21 1315.49 4898.14 7,07 -1.30 -6,95 5979690,59 588208.09 N 70,35432659 W 149,28370473 9445,51 88.64 118.31 4512,55 4591,25 2935.88 7112,06 1301,14 4924,31 2,95 0,00 -2.95 5979676.53 588234.41 N 70.35428734 W 149.28349239 9476,77 88.06 118.15 4513.45 4592,15 2966.47 7143.30 1286,36 4951,84 1.92 -1,86 -0.51 5979662.06 588262,10 N 70.35424691 W 149.28326893 9508.40 88,92 118,02 4514.28 4592.98 2997.41 7174,92 1271.47 4979.73 2,75 2.72 -0.41 5979647.48 588290.16 N 70,35420619 W 149,28304251 9539.49 91.45 117,69 4514,18 4592.88 3027,80 7206.01 1256,95 5007,22 8.21 8,14 -1,06 5979633,27 588317,80 N 70.35416646 W 149.28281942 9570.67 91,69 115,99 4513,33 4592,03 3058,15 7237.18 1242,88 5035.03 5,50 0.77 -5,45 5979619.51 588345,76 N 70.35412797 W 149.28259371 9601,60 90.73 115,66 4512,67 4591,37 3088.13 7268,10 1229.41 5062,86 3,28 -3,10 -1,07 5979606,35 588373,74 N 70.35409112 W 149.28236778 9632.44 90.02 116,19 4512.47 4591.17 3118.04 7298,94 1215.92 5090,60 2,87 -2.30 1,72 5979593,17 588401.62 N 70,35405423 W 149,28214265 9664.07 90,77 116.77 4512,25 4590.95 3148,80 7330,57 1201,82 5118,91 3,00 2,37 1.83 5979579.39 588430,09 N 70.35401565 W 149.28191287 9693,72 90.53 117,22 4511.92 4590.62 3177,68 7360,22 1188.36 5145.32 1,72 -0.81 1,52 5979566,23 588456.65 N 70,35397884 W 149,28169845 9725.05 90.39 117,34 4511,67 4590,37 3208,24 7391.55 1174,00 5173,17 0.59 -0.45 0,38 5979552.18 588484,65 N 70.35393956 W 149.28147245 9756,38 90,36 116,36 4511.46 4590.16 3238,75 7422,87 1159,85 5201.12 3.13 -0.10 -3,13 5979538,34 588512,75 N 70,35390085 W 149,28124558 9787,10 90,05 116.02 4511.35 4590.05 3268,58 7453,59 1146,30 5228.69 1.50 -1.01 -1,11 5979525.09 588540,47 N 70.35386375 W 149.28102184 9818,66 89.12 112,37 4511,58 4590,28 3298,94 7485,15 1133.36 5257.47 11.93 -2,95 -11,57 5979512.48 588569,39 N 70,35382837 W 149,28078823 9850.03 89,60 112.41 4511.93 4590,63 3328.84 7516.52 1121.41 5286.47 1,54 1,53 0.13 5979500,86 588598,52 N 70.35379567 W 149.28055281 9880,60 91,39 111.26 4511,67 4590,37 3357,88 7547,09 1110.05 5314,85 6,96 5.86 -3,76 5979489,81 588627.01 N 70,35376456 W 149,28032250 9911,56 90.43 109.87 4511.17 4589.87 3387,08 7578,04 1099,17 5343,83 5.46 -3,10 -4.49 5979479,26 588656,11 N 70.35373480 W 149,28008725 9943.42 90.12 110,07 4511,02 4589,72 3417,01 7609,90 1088,29 5373,77 1,16 -0,97 0,63 5979468.71 588686,17 N 70.35370501 W 149,27984418 9974,09 90,05 111,70 4510.98 4589,68 3445,99 7640,57 1077.36 5402.43 5.32 -0,23 5,31 5979458,10 588714.94 N 70.35367509 W 149,27961160 10004,93 89,88 111,98 4510,99 4589,69 3475,29 7671.41 1065,89 5431,05 1.06 -0,55 0,91 5979446.95 588743,69 N 70,35364369 W 149,27937924 10036,15 90,39 112.91 4510.92 4589,62 3505,06 7702,63 1053.97 5459.91 3.40 1.63 2.98 5979435.35 588772.68 N 70.35361107 W 149.27914503 10067.08 89,09 112,34 4511,06 4589,76 3534,57 7733.56 1042,07 5488.46 4,59 -4,20 -1,84 5979423.77 588801,35 N 70.35357851 W 149,27891331 10098,67 88,85 114.23 4511.63 4590,33 3564,82 7765.15 1029,58 5517.47 6,03 -0,76 5,98 5979411.61 588830,50 N 70.35354434 W 149,27867784 10130.00 89,16 116.60 4512.17 4590.87 3595,14 7796.47 1016.14 5545,76 7,63 0,99 7.56 5979398.48 588858,94 N 70.35350756 W 149,27844822 10160,91 89,29 120,23 4512,59 4591,29 3625.41 7827.38 1001.43 5572.94 11,75 0.42 11,74 5979384.08 588886,27 N 70,35346733 W 149,27822763 10191.71 88,78 121,93 4513,11 4591,81 3655,83 7858,18 985.54 5599,31 5,76 -1,66 5,52 5979368.48 588912,82 N 70.35342385 W 149,27801360 10222,85 88,68 121.29 4513,80 4592,50 3686.63 7889,31 969,22 5625,82 2,08 -0,32 -2,06 5979352.46 588939.51 N 70.35337922 W 149.27779843 10253,90 89,12 122,65 4514.40 4593.10 3717,37 7920.35 952,78 5652,16 4.60 1.42 4.38 5979336,32 588966.02 N 70,35333426 W 149.27758471 10284,54 91.46 126,20 4514,24 4592,94 3747,86 7950.99 935.47 5677 .43 13.88 7,64 11.59 5979319,29 588991.48 N 70,35328690 W 149.27737967 SurveyEditor Ver 3.1 RT-SP3,03-HF4,OO Bld( d031 rt-546 ) N-U\L-201 \L-201 L 1 PB1\L-201 L 1 PB1 Generated 4/30/2004 2:25 PM Page 3 of 4 e . Measured Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I þJong Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude Depth Section Departure (II) (dog ) (deg) (II) (II) (II) (II) (II) (II) (dog/1001l) (deg/1001l) (deg/1OOIl) (IIUS) (IIUS) 10315.84 90.70 127.26 4513.65 4592.35 3779.10 7982.28 916.75 5702.51 4.17 -2.43 3.39 5979300.85 589016.77 N 70.35323572 W 149.27717615 10347.07 90.15 131.82 4513.42 4592.12 3810.32 8013.51 896.87 5726.59 14.71 -1.76 14.60 5979281.25 589041.06 N 70.35318137 W 149.27698079 10377.71 89.06 131.00 4513.63 4592.33 3840.95 8044.15 876.61 5749.56 4.45 -3.56 -2.68 5979261.24 589064.26 N 70.35312596 W 149.27679435 10408.69 90.53 134.84 4513.74 4592.44 3871.88 8075.13 855.52 5772.25 13.27 4.74 12.39 5979240.40 589087.17 N 70.35306829 W 149.27661033 10439.54 91.90 134.72 4513.09 4591.79 3902.62 8105.97 833.79 5794.14 4.46 4.44 -0.39 5979218.93 589109.30 N 70.35300889 W 149.27643272 10470.84 90.63 134.88 4512.40 4591.10 3933.80 8137.26 811.74 5816.34 4.09 -4.06 0.51 5979197.13 589131.75 N 70.35294861 W 149.27625259 10502.36 89.40 133.61 4512.39 4591.09 3965.23 8168.78 789.75 5838.92 5.61 -3.90 -4.03 5979175.39 589154.57 N 70.35288848 W 149.27606941 10532.27 89.02 133.17 4512.80 4591.50 3995.08 8198.69 769.21 5860.65 1.94 -1.27 -1.47 597915509 589176.53 N 70.35283231 W 149.27589309 10563.29 87.89 133.03 4513.84 4592.34 4026.05 8229.70 748.02 5883.29 3.67 -3.64 -0.45 5979134.16 589199.40 N 70.35277438 W 149.27570940 10595.16 87.24 132.13 4514.99 4593.69 4057.86 8261.54 726.48 5906.74 3.48 -2.04 -2.82 5979112.88 589223.08 N 70.35271547 W 149.27551919 10625.40 87.21 132.23 4516.46 4595.16 4088.04 8291.75 706.19 5929.12 0.34 -0.10 0.33 5979092.85 589245.69 N 70.35266002 W 149.27533760 10656.58 87.41 132.73 4517.92 4596.62 4119.15 8322.89 685.16 5952.09 1.73 0.64 1.60 5979072.07 589268.89 N 70.35260250 W 149.27515124 10687.99 87.03 133.81 4519.44 4598.14 4150.48 8354.26 863.66 5974.94 3.64 -1.21 3.44 5979050.83 589291.97 N 70.35254371 W 149.27496592 10719.41 87.58 133.71 4520.92 4599.62 4181.79 8385.65 641.95 5997.60 1.78 1.75 -0.32 5979029.38 589314.87 N 70.35248436 W 149.27478203 10750.39 90.63 134.61 4521.40 4600.10 4212.68 8416.62 620.37 6019.82 10.26 9.85 2.91 5979008.05 589337.33 N 70.35242536 W 149.27460178 10781.93 91.01 135.39 4520.95 4599.65 4244.10 8448.16 598.07 6042.12 2.75 1.20 2.47 5978986.00 589359.87 N 70.35236439 W 149.27442088 10812.63 91.32 135.29 4520.33 4599.03 4274.66 8478.85 576.24 6063.70 1.06 1.01 -033 5978964.41 589381.68 N 70.35230470 W 149.27424586 10843.92 90.94 134.37 4519.71 4598.41 4305.83 8510.14 554.19 6085.88 3.18 -1.21 -2.94 5978942.61 589404.11 N 70.35224440 W 149.27406588 10875.26 90.87 134.34 4519.22 4597.92 4337.08 8541.47 532.28 6108.29 0.24 -0.22 -0.10 5978920.95 589426.76 N 70.35218450 W 149.27388412 10905.66 91.28 134.49 4518.65 4597.35 4367.38 8571.87 51101 6130.00 1.44 1.35 0.49 5978899.93 589448.70 N 70.35212634 W 149.27370800 10938.01 92.83 132.85 4517.49 4596.19 4399.84 8604.19 488.68 6153.38 6.97 4.79 -5.07 5978877.87 589472.33 N 70.35206531 W 149.27351831 10969.30 93.27 133.51 4515.82 4594.52 4430.84 8635.44 467.30 6176.17 2.53 1.41 211 5978856.74 589495.35 N 70.35200685 W 149.27333348 10999.82 92.21 131.65 4514.36 4593.06 4461.29 8665.93 446.68 6198.61 7.01 -3.47 -609 5978836.37 589518.02 N 70.35195045 W 149.27315138 11030.30 91.18 131.73 4513.46 4592.16 4491.75 8696.39 426.42 6221.36 3.39 -3.38 0.26 5978816.36 589540.99 N 70.35189504 W 149.27296682 11061.81 90.87 131.04 4512.90 4591.60 4523.24 8727.90 405.59 6245.00 2.40 -0.98 -2.19 5978795.80 589564.86 N 70.35183809 W 149.27277506 11092.72 90.91 131.97 4512.42 4591.12 4554.14 8758.80 385.11 6268.15 301 0.13 3.01 5978775.58 589588.23 N 70.35178208 W 149.27258729 11123.41 90.94 131.99 4511.92 4590.62 4584.81 8789.49 384.58 6290.96 0.12 0.10 0.07 5978755.31 589611.26 N 70.35172596 W 149.27240223 11153.99 90.84 131.88 4511.45 4590.15 4615.36 8820.06 344.15 6313.70 0.49 -0.33 -0.36 5978735.13 589634.23 N 70.35167008 W 149.27221771 11185.30 90.63 130.92 4511.04 4589.74 4646.66 8851.37 323.44 6337.19 3.14 -0.67 -3.07 5978714.70 589657.94 N 70.35161347 W 149.27202721 11216.61 90.46 131.67 4510.75 4589.45 4677.96 8882.68 302.78 6360.71 2.46 -0.54 2.40 5978694.30 589681.69 N 70.35155697 W 149.27183638 11247.27 90.60 132.30 4510.46 4589.16 4708.60 8913.34 282.27 6383.50 2.10 0.46 2.05 5978674.05 589704.71 N 70.35150089 W 149.27165151 11273.99 90.39 132.13 4510.23 4588.93 4735.30 8940.06 264.32 6403.29 1.01 -0.79 -0.64 5978656.32 589724.69 N 70.35145179 W 149.27149098 11304.91 90.49 131.96 4509.99 4588.69 4766.20 8970.98 243.61 6426.25 0.64 0.32 -0.55 5978635.87 589747.88 N 70.35139517 W 149.27130472 11337.59 90.39 131.48 4509.74 4588.44 4798.87 9003.66 221.87 8450.64 1.50 -0.31 -1.47 5978614.40 589772.51 N 70.35133570 W 149.27110685 11368.37 89.23 133.02 4509.85 4588.55 4829.62 9034.44 201.17 8473.42 6.26 -3.77 5.00 5978593.96 589795.52 N 70.35127911 W 149.27092204 11403.91 86.48 133.31 4511.18 4589.88 4865.08 9069.95 176.88 8499.33 7.78 -7.74 0.82 5978569.96 589821.69 N 70.35121268 W 149.27071193 11433.39 85.65 133.91 4513.20 4591.90 4894.43 9099.36 156.59 6520.62 3.47 -2.82 204 5978549.91 589843.20 N 70.35115722 W 149.27053920 11465.45 86.55 133.21 4515.38 4594.08 4926.35 9131.34 134.55 6543.80 3.55 2.81 -2.18 5978528.13 589866.62 N 70.35109695 W 149.27035119 11495.99 87.51 134.06 4516.96 4595.66 4956.79 9161.84 113.51 6565.87 4.20 3.14 2.78 5978507.33 589888.93 N 70.35103940 W 149.27017214 11527.54 87.92 134.13 4518.22 4596.92 4988.23 9193.37 91.57 6588.51 1.32 1.30 0.22 5978485.65 589911.81 N 70.35097941 W 149.26998850 11559.80 85.90 134.51 4519.96 4598.86 5020.35 9225.58 69.06 8611.56 6.37 -6.26 1.18 5978463.41 589935.10 N 70.35091788 W 149.26980157 11590.10 85.31 133.86 4522.28 4600.98 5050.48 9255.79 48.01 6633.22 2.89 -1.95 -2.15 5978442.59 589956.99 N 70.35086030 W 149.26962585 11622.43 85.28 133.20 4524.93 4603.63 5082.64 9288.01 25.82 6656.58 2.04 -0.09 -2.04 5978420.67 589980.60 N 70.35079962 W 149.26943637 11652.81 85.93 134.53 4527.26 4605.96 5112.86 9318.30 4.83 6678.42 4.86 2.14 4.38 5978399.92 590002.67 N 70.35074223 W 149.26925924 11683.81 87.24 135.20 4529.11 4607.81 5143.70 9349.24 -17.00 6700.35 4.74 4.23 2.16 5978378.34 590024.84 N 70.35068254 W 149.26908135 11714.53 86.52 136.13 4530.78 4609.48 5174.22 9379.92 -38.94 6721.79 3.82 -2.34 3.03 5978356.64 590046.51 N 70.35062255 W 149.26890748 11746.62 84.86 137.38 4533.19 4611.89 5206.00 9411.92 -62.25 6743.71 6.47 -5.17 3.90 5978333.58 590068.69 N 70.35055882 W 149.26872968 11775.98 85.39 137.24 4535.69 4614.39 5235.01 9441.17 -83.75 6763.55 1.87 1.81 -0.48 5978312.30 590088.76 N 70.35050003 W 149.26856882 11808.31 85.83 137.57 4538.16 4616.86 5266.98 9473.41 -107.48 6785.36 1.70 1.36 1.02 5978288.82 590110.84 N 70.35043515 W 149.26839189 11840.09 85.93 137.75 4540.44 4619.14 5298.39 9505.10 -130.91 6806.71 0.65 0.31 0.57 5978265.63 590132.45 N 70.35037108 W 149.26821875 11870.70 86.55 137.63 4542.45 4621.15 5328.86 9535.65 -153.50 6827.27 2.06 2.03 -0.39 5978243.27 590153.26 N 70.35030932 W 149.26805200 11901.83 87.10 137.18 4544.18 4622.88 5359.49 9566.73 -176.38 6848.31 2.28 1.77 -1.45 5978220.63 590174.54 N 70.35024676 W 149.26788140 11932.56 87.68 136.25 4545.57 4624.27 5389.97 9597.43 -198.73 6869.36 3.56 1.89 -3.03 5978198.52 590195.84 N 70.35018566 W 149.26771071 11963.33 88.27 137.19 4546.86 4625.36 5420.51 9628.18 -221.11 6890.44 3.61 1.92 3.05 5978176.37 590217.16 N 70.35012445 W 149.26753974 11994.22 91.22 136.25 4546.80 4625.50 5451.19 9659.06 -243.60 6911.61 10.02 9.55 -3.04 5978154.13 590238.58 N 70.35006297 W 149.26736802 12026.77 90.60 134.39 4546.28 4624.98 5483.59 9691.61 -266.74 6934.50 6.02 -1.90 -5.71 5978131.25 590261.72 N 70.34999970 W 149.26718243 12057.23 91.63 135.13 4545.69 4624.39 5513.94 9722.06 -288.18 6956.12 4.16 3.38 2.43 5978110.04 590283.58 N 70.34994106 W 149.26700705 12088.84 92.55 133.69 4544.54 4623.24 5545.43 9753.65 -310.29 6978.69 5.40 2.91 -4.56 5978088.19 590306.39 N 70.34988061 W 149.26682404 12119.68 92.04 132.79 4543.30 4622.00 5576.20 9784.47 -331.40 7001.13 3.35 -1.65 -2.92 5978067.34 590329.07 N 70.34982289 W 149.26664197 12172.00 92.04 132.79 4541.44 4620.14 5628.42 9836.75 -366.92 7039.50 0.00 0.00 0.00 5978032.25 590367.83 N 70.34972575 W 149.26633076 LeQaI Description: NorthinA /YI fftUSl EestinA IXI rftUSI Surface: 2597 FSL 3588 FEL S34 T12N R11 E UM 5978320.84 583325.34 BHL: 2227 FSL 1830 FEL S35 T12N R11 E UM 5978032.25 590367.83 SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31rt-546 } N-UIL-201IL-201 L 1 PB1\L-201 L 1 PB1 Generated 4/30/2004 2:25 PM Page 4 of 4 2266' H4-112"I-ESXNlP,ID=3,813" I ~ GAS LIFT MANDRELS ST MD TVD DEV lYÆ VLV LATCH FORT DATE L 4 2370 2101 46 KBG-2 DMY BK-5 0 04/23/04 3 3525 2857 50 KBG-2 DMY BK-5 0 04/23/04 2 4680 3612 49 KBG-2 DMY BK-5 0 04/23/04 14-112"A-IOENIXDSCI-RGE-PRESSSUB,ID=3.85"H 5814' r - 1 5708 4272 57 KBG-2 D0<2 BEK 04/23/04 1-1- I 5825' H4-1/2" BKR CM) SLIONG SLV, ID = 3,812" 14-112"A-IOENIXJErRJMPSENSOR,ID=3,833" H 5849' t<:::;:7- "'V7'~ 5873' H7-5I8"X4-1/Z'BKRffiev1A<R,ID=3,875" 1 ð ~ 5942' H4-112" I-ESX NlP,ID=3,813" I IRA TAGH 5975' ~ ~~ 5963' H4-1/2" HESX NIP, ID=3,813" I 17-5/8"x5-112"BKRZXPA<R,ID=5.75" H 5982' ~ ~ 6000' H4-1/Z'BKRSEALASSEM3LY I. ~ rc_ _6~~1~ _ ~~1~Z~X_4~1~2':O, ID= 3.960"1 BKRf-UGHESHOOKHGR,ID=5.64" H 6020' ~ ~________________J 7-5I8"WII'DOW@6025' 1 ;;,. ~ e TREE =' FMC4-1/6" 5M "WB...LI-EAD = FMC G8'J 5 ,.. ... . _A A CTUA TOR = KffäEìJ;-- -- 78.70' BF. Èi..EìJ- =H 51.93' kOP '::; '^_A_"A__'''^,^~A 300' < " "om__ _,.. . .. A MaxAngle= 94@12711' _ . .., , ^ ~_..~~~'_~~~^'~~'.A_'_ Datum MD = 6137' ~-, - ~.......~~,~~~,,~"~ "..- Datum TVD = 4400' SS I H 20" CONDUCTOR 110-3/4" CSG. 45,5#, L-BO, ID = 9,95" H 3197' IMinimum ID = 3.813" @ 2266' I 4-112" HES X NIPPLE IRA TAGH 17-5/8" X 5-1/2" BKR ZXP A<R, ID = 5,75" H IBKR HLGHES HOOK HGR, ID = 5.64" H IRA TAG H 17-518" X 5-1/Z' BKRZXPPKR, ID = 5,75" H IBKRHLGHffi HOOK H3R, ID= 5.64" H ÆRFORA TON SUfvYv1ARY REF LOG: ANGLE AT TOP PERF: xx @ xxxx' Note: Refer to Production DB for historical perf data SIZE SFr INTER\! AL OpnlSqz DATE 4-1/2" SLTD OA 6090 - 9802 0 04/24/04 4-1/2" SLTD OBa 6295- 13405 0 04/18/04 4-1/2" SLTD OBb 6434 - 13465 0 04/09/04 4-1/2" SLTD OBd 7028 - 13628 0 04/04104 17-5/8" CSG, 29.7#, L-80, 10= 6,875" H ~ 13672' [)I\ TE REV BY COMt'vENTS 05104104 TWA/KAI< ORIGINAL COMPLETION 6179' 6173' 6224' 6324' 6319' 6367 7047' J 114' I ~ ~ :=¡ ~ ~ :g ~ DATE REV BY L-20 1 L-201 L 1 L-201 L2 L-201 L3 1 I I I I I I I I L----.: I 6020' - 9846' 6-314" OA LATERAL, 10 = 3.958" I'V~. 6200' H4-1/2" BKR SEAL ASSev1BLY ~ 6207 H5-1/2"X 4-112" XO,10=3.960" ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ] I 7-5/8" WINOOW @ 6229' I 6224' -13448' 6-3/4" OBa LATERAL, 10 = 3.958" 1 ~ 6346' H4-1/2"BKRSEALASSEM3LY 1 F-C 6353' H5-1/2" X4-112" XO, 10 =3.960"1 ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~J I 7-518" WINDOW@ 6372' I 6367'-13506' 6-3/4"OBb LATERAL, 10 = 3.958" :g~ I I ~NOTE5 l ¡' 6432' 6476' 6481' H7-5/8" X 5-1/2" BKRZXP LNRTOP PKR, 10 =4.840" H4-1/Z'BKRSEALASSEMBLY I H5-1/2" X4-1/Z' XO, 10= 3,980" 1 ~ RATAG I I 6432'.. 13672' 6-3/4" OBd LATERAL, 10 = 3.958" COMfvENfS ORION UNIT WB...L: L-201, L-201 L 1, L-201 L2, L-201 L3 ÆRMIT No: 204046 (047) (048) (049) AR No: 50-029-23202-00 (60) (61) (62) SEC 34, T12N, R11E, 2598' NSL & 3588' WB... BP Exploration (Alaska) Client.... ..... ....... ...: BP Exploration Inc. Field. . . . . . . . . . . . . . . . . . . .: Orion Well. . . . . . . . . . . . . . . . . . . . .: L-201 L1 API number..... ....... ...: 50-029- 23202-60 Engineer............. ....: M. Perdomo RIG: . . . . . . . . . . . . . . . . . . . . .: NABORS 9ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.. ...: Minimum curvature Method for DLS........ ...: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..... .....: MEAN SEA LEVEL Depth reference.... ......: Driller's Pipe Tally GL above permanent.......: 50.20 ft KB above permanent.... ...: N/A Top Drive ft DF above permanent..... . .': 78.70 ft ----- Vertical section origin---------------- Latitude (+N/S-) ..... ....: 0.00 ft Departure (+E/W-).. ......: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-). ........: N 70.35073717 ft Departure (+E/W-)........: W 149.32347531 ft SCRLUMBERGER Survey report Azimuth from rotary table to target: 130.00 degrees [(c)2004 IDEAL ID8 1C 02 11-Apr-2004 15:14:38 Spud date... ....... .... ..: Last survey date... '" ...: Total accepted surveys...: MD of first survey.......: MD of last survey........: Page 1 of 12 05-Apr-2004 10-Apr-04 301 o . 00 ft 13540.00 ft ----- Geomagnetic data ---------------------- Magnetic model........ ...: BGGM version 2003 Magnetic date.... ........: 20-Mar-2004 Magnetic field strength..: 1151.21 RCNT Magnetic dec (+E/W-).....: 25.03 degrees Magnetic dip..... ........: 80.82 degrees ----- MWD survey Reference Reference G. ........... ..: Reference R. ........... ..: Reference Dip.......... ..: Tolerance of G.... ... ....: Tolerance of R...........: Tolerance of Dip... ......: Criteria --------- 1002.68 mGal 1151. 21 RCNT 80.82 degrees (+/-) 2.50 mGal (+/-) 6.00 RCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-)... ..: 25.03 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-). ...: 25.03 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction e ~ \~ .) o \~ o ~ e SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 2 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (n) (ft) (n) (n) (n) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYR None 3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYR None 4 324.00 2.13 19.40 100.00 323.97 -1.57 2.37 -0.05 2.38 358.72 1. 76 GYR None 5 395.00 4.15 21.01 71.00 394.86 -2.87 6.02 1.31 6.16 12.25 2.85 GYR None e 6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYR None 7 595.00 8.86 11.46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYR None 8 695.00 11.87 12.48 100.00 691. 99 -20.13 44.33 10.92 45.65 13.83 3.02 GYR None 9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG 10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21. 32 86.02 14.35 3.12 MWD GMAG 11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115.96 14.89 2.38 MWD GMAG 12 1040.82 22.84 16.89 93.36 1021. 28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG 13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG 14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG 15 1321.50 29.42 18.07 95.37 1272.00 -111.15 264.57 76.90 275.52 16.21 1.53 MWD GMAG 16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91. 86 323.53 16.49 1. 77 MWD GMAG 17 1511 . 08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1.83 MWD GMAG 18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG 19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG e 20 1797.56 36.27 18.62 98.02 1671. 38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG 21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591. 00 17.60 0.97 MWD GMAG 22 1988.07 39.87 19.15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG 23 2081.93 41. 57 20.11 93.86 1893.38 -267.74 677.09 218.63 711. 51 17.90 1.93 MWD GMAG 24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG 25 2269.96 45.03 20.88 94.18 2030.82 -311.34 797.53 262.78 839.71 18.24 2.56 MWD GMAG 26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG 27 2458.33 47.95 21. 23 96.59 2161. 62 -355.21 923.95 311. 59 975.08 18.64 2.54 MWD GMAG 28 2552.24 48.94 21.51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG 29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG 30 2740.10 50.69 21.63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 - SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 3 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 2834.26 50.10 21. 09 94.16 2405.24 -446.33 1190.40 416.22 1261.07 19.27 0.77 MWD GMAG 32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG 33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG 34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG 35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501.52 19.80 0.67 MWD GMAG 36 3266.50 47.43 25.10 114.34 2688.89 -541.75 1490.59 543.55 1586.61 20.03 1. 92 MWD GMAG e 37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561. 57 1630.69 20.14 4.16 MWD GMAG 38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG 39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG 40 3609.16 49.34 23.32 93.81 2911.68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG 41 3701.35 50.03 21. 52 92 .19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1. 67 MWD GMAG 42 3794.96 50.31 21. 39 93.61 3031.29 -659.14 1860.94 701.06 1988.61 20.64 0.32 MWD GMAG 43 3888.81 50.23 21. 33 93.85 3091. 27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG 44 3982.46 49.83 20.65 93.65 3151.43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG 45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG 46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277.18 20.66 0.55 MWD GMAG 47 4266.06 48.39 21. 00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG 48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG 49 4454.28 47.80 22.75 94.27 3461.74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG 50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG e 943.36 2626.91 GMAG 51 4641.89 48.96 31.87 93.78 3586.62 -853.25 2451.68 21. 05 4.03 MWD 52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21.38 3.58 MWD GMAG 53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21. 82 3.66 MWD GMAG 54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG 55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG 56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG 57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG 58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG 59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG 60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451. 92 3156.80 27.38 5.64 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 4 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG 62 5677.97 56.15 89.22 95.09 4255.06 -581.22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG 63 5769.98 58.26 91. 53 92.01 4304.90 -521.65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG 64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG 65 5955.46 61. 37 98.97 93.30 4399.26 -390.85 2802.35 1841. 23 3353.10 33.31 4.62 MWD GMAG 66 6049.62 64.61 102.59 94.16 4442.03 -317.64 2786.62 1923.60 3386.08 34.62 4.85 MWD GMAG e 67 6143.03 65.95 107.59 93.41 4481.11 -240.71 2764.52 2005.48 3415.34 35.96 5.07 MWD GMAG 68 6237.33 68.65 110.96 94.30 4517.51 -159.36 2735.79 2087.57 3441. 29 37.35 4.37 MWD GMAG 69 6330.67 72.77 113.73 93.34 4548.34 -75.43 2702.28 2169.02 3465.11 38.75 5.23 TOP OF WINDOW 70 6372.00 74.45 114.96 41. 33 4560.01 -37.25 2685.94 2205.14 3475.18 39.39 4.97 BOTTOM WINDOW 71 6384.00 76.22 115.73 12.00 4563.04 -26.02 2680.97 2215.63 3478.02 39.57 16.00 MWD Incl. Only 72 6404.88 78.82 115.47 20.88 4567.56 -6.28 2672 .16 2234.02 3483.00 39.90 12.51 MWD Incl. Only 73 6436.12 81. 44 115.09 31.24 4572.91 23.49 2659.02 2261. 84 3490.89 40.39 8.47 MWD Incl. Only 74 6467.35 85.08 114 . 71 31. 23 4576.58 53.43 2645.96 2289.97 3499.30 40.87 11.72 MWD Incl. Only 75 6498.50 89.31 114.33 31.15 4578.10 83.40 2633.05 2318.27 3508.18 41. 36 13.63 MWD Incl. Only 76 6530.44 90.86 113.95 31.94 4578.05 114.13 2619.99 2347.42 3517.77 41.86 5.00 MWD Incl. Only 77 6561. 55 92.09 113.58 31.11 4577.25 143.99 2607.46 2375.88 3527.55 42.34 4.13 MWD Incl. Only 78 6592.41 93.09 113.22 30.86 4575.86 173.53 2595.22 2404.17 3537.68 42.81 3.44 MWD Incl. Only 79 6624.01 90.26 112.85 31. 60 4574.93 203.74 2582.86 2433.24 3548.49 43.29 9.03 MWD GMAG 80 6655.31 90.02 113.77 31. 30 4574.86 233.72 2570.47 2461.98 3559.31 43.76 3.04 MWD GMAG 81 6685.25 92.97 114 . 91 29.94 4574.08 262.53 2558.14 2489.25 3569.37 44.22 10.56 MWD GMAG It 82 6716.74 90.67 113.70 31. 49 4573.08 292.83 2545.19 2517.93 3580.21 44.69 8.25 MWD GMAG 83 6747.77 89.47 117.00 31.03 4573.04 322.85 2531. 90 2545.97 3590.61 45.16 11.32 MWD GMAG 84 6778.97 90.26 119.95 31. 20 4573.11 353.42 2517.03 2573.39 3599.69 45.63 9.79 MWD GMAG 85 6809.74 91. 32 122.81 30.77 4572.69 383.83 2501.01 2599.65 3607.39 46.11 9.91 MWD GMAG 86 6841. 42 92.42 125.31 31.68 4571.65 415.32 2483.28 2625.88 3614.13 46.60 8.62 MWD GMAG 87 6872.99 92.45 123.71 31. 57 4570.31 446.72 2465.41 2651.87 3620.87 47.09 5.06 MWD GMAG 88 6903.56 90.22 122.19 30.57 4569.60 477.05 2448.79 2677.52 3628.45 47.55 8.83 MWD GMAG 89 6934.63 87.92 119.45 31. 07 4570.10 507.71 2432.87 2704.19 3637.52 48.02 11.51 MWD GMAG 90 6966.17 89.98 121.64 31. 54 4570.68 538.81 2416.85 2731.35 3647.11 48.50 9.53 MWD GMAG [ (c) 2004 IDEAL ID8 1C 02 SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 5 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 6996.79 91.52 120.94 30.62 4570.28 569.07 2400.95 2757.51 3656.28 48.95 5.52 MWD GMAG 92 7028.26 92.31 122.84 31.47 4569.23 600.21 2384.33 2784.21 3665.64 49.42 6.54 MWD GMAG 93 7057.40 92.97 122.97 29.14 4567.89 629.10 2368.52 2808.65 3674.02 49.86 2.31 MWD GMAG 94 7089.66 90.94 124.36 32.26 4566.79 661.14 2350.65 2835.48 3683.14 50.34 7.62 MWD GMAG 95 7120.81 89.71 125.41 31.15 4566.61 692.16 2332.83 2861.03 3691.56 50.81 5.19 MWD GMAG 96 7152.24 89.26 125.44 31.43 4566.89 723.49 2314.62 2886.65 3700.02 51. 28 1.43 MWD GMAG e 97 7182.85 89.09 126.42 30.61 4567.33 754.02 2296.66 2911. 43 3708.24 51.73 3.25 MWD GMAG 98 7213.84 89.98 128.58 30.99 4567.58 784.98 2277.79 2936.01 3715.98 52.20 7.54 MWD GMAG 99 7245.39 88.88 127.80 31.55 4567.90 816.51 2258.29 2960.81 3723.74 52.67 4.27 MWD GMAG 100 7276.71 88.20 128.13 31. 32 4568.70 847.80 2239.03 2985.49 3731.81 53.13 2.41 MWD GMAG 101 7306.90 88.02 128.77 30.19 4569.69 877.96 2220.27 3009.12 3739.57 53.58 2.20 MWD GMAG 102 7338.68 90.74 130.58 31. 78 4570.04 909.74 2199.98 3033.58 3747.33 54.05 10.28 MWD GMAG 103 7369.54 91. 87 129.16 30.86 4569.33 940.59 2180.20 3057.25 3755.01 54.51 5.88 MWD GMAG 104 7400.91 92.35 127.28 31.37 4568.18 971 . 92 2160.81 3081.88 3763.92 54.96 6.18 MWD GMAG 105 7431.85 92.11 127.90 30.94 4566.97 1002.81 2141. 95 3106.38 3773.27 55.41 2.15 MWD GMAG 106 7463.94 92.11 125.69 32.09 4565.79 1034.82 2122.74 3132.06 3783.63 55.87 6.88 MWD GMAG 107 7493.05 91. 42 123.68 29.11 4564.90 1063.79 2106.19 3155.98 3794.24 56.28 7.30 MWD GMAG 108 7524.80 90.12 121.74 31.75 4564.47 1095.28 2089.03 3182.69 3807.05 56.72 7.35 MWD GMAG 109 7555.28 89.09 119.65 30.48 4564.68 1125.36 2073.47 3208.90 3820.52 57.13 7.64 MWD GMAG 110 7587.15 88.95 118.02 31.87 4565.22 1156.62 2058.11 3236.81 3835.72 57.55 5.13 MWD GMAG 111 7617.36 88.44 116.26 30.21 4565.91 1186.06 2044.33 3263.69 3851.10 57.94 6.06 MWD GMAG e 112 7647.33 89.09 116.04 29.97 4566.56 1215.15 2031.12 3290.59 3866.97 58.31 2.29 MWD GMAG 113 7677.57 89.60 114.59 30.24 4566.90 1244.40 2018.20 3317.92 3883.52 58.69 5.08 MWD GMAG 114 7708.53 90.12 114.06 30.96 4566.98 1274.21 2005.44 3346.13 3901.08 59.06 2.40 MWD GMAG 115 7739.39 90.12 115.48 30.86 4566.91 1303.99 1992.51 3374.15 3918.55 59.44 4.60 MWD GMAG 116 7769.77 90.15 114.37 30.38 4566.84 1333.32 1979.71 3401. 70 3935.84 59.80 3.66 MWD GMAG 117 7800.51 89.81 114.58 30.74 4566.85 1362.94 1966.98 3429.68 3953.69 60.17 1. 30 MWD GMAG 118 7830.73 89.57 114.06 30.22 4567.02 1392.03 1954.53 3457.22 3971.46 60.52 1. 90 MWD GMAG 119 7860.94 89.91 113.75 30.21 4567.15 1421.06 1942.29 3484.83 3989.56 60.87 1. 52 MWD GMAG 120 7891. 93 89.64 114.24 30.99 4567.28 1450.85 1929.69 3513 .15 4008.23 61.22 1. 81 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 - - SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 6 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 121 7922.42 87.99 113.27 30.49 4567.91 1480.11 1917.41 3541.04 4026.84 61. 57 6.28 MWD GMAG 122 7952.82 86.82 111 . 52 30.40 4569.28 1509.06 1905.84 3569.12 4046.09 61.90 6.92 MWD GMAG 123 7983.67 89.33 113.81 30.85 4570.32 1538.49 1893.96 3597.57 4065.66 62.24 11.01 MWD GMAG 124 8014.45 91. 08 114.14 30.78 4570.21 1568.07 1881.45 3625.69 4084.79 62.57 5.79 MWD GMAG 125 8045.57 91. 25 112.93 31. 12 4569.58 1597.91 1869.03 3654.22 4104.46 62.91 3.93 MWD GMAG 126 8076.05 91.11 112 . 84 30.48 4568.95 1627.03 1857.18 3682.29 4124.12 63.24 0.55 MWD GMAG e 127 8106.65 90.56 113.29 30.60 4568.50 1656.30 1845.19 3710.44 4143.92 63.56 2.32 MWD GMAG 128 8137.26 91. 01 114 . 11 30.61 4568.08 1685.68 1832.89 3738.47 4163.61 63.88 3.06 MWD GMAG 129 8168.01 90.87 112.06 30.75 4567.58 1715.09 1820.83 3766.75 4183.76 64.20 6.68 MWD GMAG 130 8199.28 89.36 109.99 31. 27 4567.52 1744.66 1809.61 3795.94 4205.22 64.51 8.19 MWD GMAG 131 8229.84 89.30 108.59 30.56 4567.87 1773.24 1799.52 3824.78 4226.96 64.80 4.59 MWD GMAG 132 8260.46 88.75 106.32 30.62 4568.39 1801.51 1790.34 3853.98 4249.53 65.08 7.63 MWD GMAG 133 8291. 36 89.43 107.50 30.90 4568.88 1829.94 1781.35 3883.54 4272.60 65.36 4.41 MWD GMAG 134 8323.15 90.67 108.12 31.79 4568.86 1859.37 1771.63 3913.81 4296 .11 65.65 4.36 MWD GMAG 135 8354.13 90.56 107.75 30.98 4568.52 1888.08 1762.09 3943.28 4319.08 65.92 1.25 MWD GMAG 136 8384.87 90.12 107.21 30.74 4568.34 1916.48 1752.86 3972.60 4342.13 66.19 2.27 MWD GMAG 137 8415.30 88.47 106.43 30.43 4568.72 1944.44 1744.05 4001.72 4365.26 66.45 6.00 MWD GMAG 138 8447.69 89.36 107.40 32.39 4569.33 1974.24 1734.63 4032.71 4389.95 66.73 4.06 MWD GMAG 139 8478.65 90.70 109.62 30.96 4569.31 2003.04 1724.80 4062.06 4413.08 66.99 8.38 MWD GMAG 140 8509.62 92.66 110.01 30.97 4568.41 2032.09 1714.31 4091.19 4435.84 67.27 6.45 MWD GMAG 141 8541. 08 92.86 109.90 31. 46 4566.89 2061. 61 1703.58 4120.72 4458.98 67.54 0.73 MWD GMAG e 142 8571.91 92.72 108.98 30.83 4565.39 2090.45 1693.33 4149.76 4481.95 67.80 3.01 MWD GMAG 143 8603.14 92.18 110.47 31. 23 4564.06 2119.71 1682.80 4179.13 4505.21 68.07 5.07 MWD GMAG 144 8634.38 88.92 109.35 31. 24 4563.76 2149.05 1672.17 4208.50 4528.53 68.33 11. 03 MWD GMAG 145 8665.48 87.30 109.79 31.10 4564.78 2178.17 1661.76 4237.78 4551.95 68.59 5.40 MWD GMAG 146 8696.92 87.07 109.71 31.44 4566.33 2207.64 1651.15 4267.34 4575.64 68.85 0.77 MWD GMAG 147 8728.38 87.00 109.56 31. 46 4567.95 2237.09 1640.59 4296.93 4599.47 69.10 0.53 MWD GMAG 148 8759.09 87.37 109.85 30.71 4569.46 2265.86 1630.25 4325.80 4622.80 69.35 1. 53 MWD GMAG 149 8791.07 87.13 110.95 31.98 4571.00 2295.95 1619.11 4355.74 4646.94 69.61 3.52 MWD GMAG 150 8822.42 85.45 113.38 31. 35 4573.02 2325.73 1607.31 4384.71 4670.03 69.87 9.41 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 7 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr (ft) (deg) (de g) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 151 8853.19 85.21 111. 55 30.77 4575.53 2354.97 1595.59 4413 .05 4692.65 70.12 5.98 MWD GMAG 152 8884.30 84.80 111. 59 31.11 4578.24 2384.37 1584.20 4441.87 4715.92 70.37 1. 32 MWD GMAG 153 8916.32 84.62 112.56 32.02 4581.19 2414.71 1572.22 4471.42 4739.78 70.63 3.07 MWD GMAG 154 8946.42 85.04 114.27 30.10 4583.90 2443.44 1560.30 4498.93 4761. 82 70.87 5.83 MWD GMAG 155 8978.21 86.24 116.51 31.79 4586.32 2474.11 1546.71 4527.56 4784.47 71.14 7.98 MWD GMAG 156 9009.58 89.09 119.57 31.37 4587.60 2504.76 1531. 98 4555.22 4805.93 71.41 13.32 MWD GMAG e 157 9041.71 90.63 118.97 32.13 4587.68 2536.33 1516.27 4583.25 4827.55 71. 69 5.14 MWD GMAG 158 9072.65 90.43 118.64 30.94 4587.39 2566.68 1501.37 4610.36 4848.66 71. 96 1.25 MWD GMAG 159 9103.96 88.06 119.27 31. 31 4587.80 2597.41 1486.21 4637.75 4870.07 72.23 7.83 MWD GMAG 160 9134.01 87.17 119.06 30.05 4589.05 2626.89 1471.58 4663.97 4890.62 72.49 3.04 MWD GNAG 161 9165.46 88.61 123.39 31. 45 4590.21 2657.95 1455.29 4690.84 4911.40 72.76 14.50 MWD GMAG 162 9197.72 89.09 123.47 32.26 4590.86 2689.99 1437.52 4717.75 4931.90 73.05 1. 51 MWD GMAG 163 9227.58 89.19 124.58 29.86 4591.31 2719.68 1420.82 4742.50 4950.76 73.32 3.73 MWD GMAG 164 9257.44 90.32 126.34 29.86 4591.44 2749.45 1403.49 4766.82 4969.14 73.59 7.00 MWD GMAG 165 9289.25 91.73 124.85 31. 81 4590.87 2781.16 1384.98 4792.68 4988.78 73.88 6.45 MWD GMAG 166 9320.84 91.70 125.41 31. 59 4589.92 2812.62 1366.81 4818.50 5008.61 74.16 1. 77 MWD GMAG 167 9351.30 89.71 124.79 30.46 4589.55 2842.96 1349.30 4843.42 5027.86 74.43 6.84 MWD GMAG 168 9383.28 89.06 121. 44 31. 98 4589.89 2874.71 1331. 83 4870.20 5049.02 74.71 10.67 MWD GMAG 169 9415.66 88.64 119.19 32.38 4590.54 2906.62 1315.49 4898.15 5071.72 74.97 7.07 MWD GMAG 170 9445.51 88.64 118.31 29.85 4591. 25 2935.88 1301.14 4924.31 5093.31 75.20 2.95 MWD GMAG 171 9476.77 88.06 118.15 31. 26 4592.15 2966.47 1286.36 4951.84 5116.19 75.44 1. 92 MWD GMAG - 172 9508.40 88.92 118.02 31.63 4592.98 2997.41 1271.47 4979.73 5139.49 75.68 2.75 MWD GMAG 173 9539.49 91. 45 117.69 31. 09 4592.88 3027.80 1256.95 5007.22 5162.57 75.91 8.21 MWD GMAG 174 9570.67 91. 69 115.99 31.18 4592.03 3058.15 1242.88 5035.03 5186.16 76.13 5.50 MWD GMAG 175 9601.60 90.73 115.66 30.93 4591.37 3088.13 1229.41 5062.86 5209.99 76.35 3.28 MWD GMAG 176 9632.44 90.02 116.19 30.84 4591.17 3118.05 1215.92 5090.60 5233.80 76.57 2.87 MWD GMAG 177 9664.07 90.77 116.77 31.63 4590.95 3148.80 1201. 82 5118.91 5258.10 76.79 3.00 MWD GMAG 178 9693.72 90.53 117.22 29.65 4590.62 3177.68 1188.36 5145.33 5280.78 77.00 1. 72 MWD GMAG 179 9725.05 90.39 117.34 31. 33 4590.37 3208.24 1174.00 5173.17 5304.71 77.21 0.59 MWD GMAG 180 9756.38 90.36 116.36 31. 33 4590.16 3238.75 1159.85 5201.12 5328.88 77.43 3.13 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 8 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 181 9787.10 90.05 116.02 30.72 4590.05 3268.58 1146.30 5228.69 5352.87 77.63 1.50 MWD GMAG 182 9818.66 89.12 112.37 31.56 4590.28 3298.94 1133.36 5257.47 5378.24 77.83 11.93 MWD GMAG 183 9850.03 89.60 112.41 31. 37 4590.63 3328.84 1121. 42 5286.47 5404.11 78.02 1.54 MWD GMAG 184 9880.60 91. 39 111. 26 30.57 4590.37 3357.89 1110.05 5314.85 5429.53 78.20 6.96 MWD GMAG 185 9911.56 90.43 109.87 30.96 4589.87 3387.08 1099.17 5343.83 5455.70 78 .38 5.46 MWD GMAG 186 9943.42 90.12 110.07 31. 86 4589.72 3417.01 1088.29 5373.77 5482.87 78.55 1.16 MWD GMAG e 187 9974.09 90.05 111.70 30.67 4589.68 3445.99 1077.36 5402.43 5508.81 78.72 5.32 MWD GMAG 188 10004.93 89.88 111.98 30.84 4589.69 3475.29 1065.89 5431.05 5534.66 78.90 1. 06 MWD GMAG 189 10036.15 90.39 112.91 31.22 4589.62 3505.06 1053.97 5459.91 5560.71 79.07 3.40 MWD GMAG 190 10067.08 89.09 112.34 30.93 4589.76 3534.57 1042.07 5488.46 5586.51 79.25 4.59 MWD GMAG 191 10098.67 88.85 114.23 31. 59 4590.33 3564.82 1029.58 5517.47 5612.71 79.43 6.03 MWD GMAG 192 10130.00 89.16 116.60 31. 33 4590.87 3595.14 1016.14 5545.76 5638.08 79.62 7.63 MWD GMAG 193 10160.91 89.29 120.23 30.91 4591.29 3625.41 1001. 44 5572.94 5662.20 79.81 11.75 MWD GMAG 194 10191.71 88.78 121. 93 30.80 4591.81 3655.83 985.54 5599.31 5685.38 80.02 5.76 MWD GMAG 195 10222.85 88.68 121. 29 31. 14 4592.50 3686.63 969.22 5625.83 5708.70 80.23 2.08 MWD GMAG 196 10253.90 89.12 122.65 31. 05 4593.10 3717.37 952.78 5652.16 5731.90 80.43 4.60 MWD GMAG 197 10284.54 91. 46 126.20 30.64 4592.94 3747.86 935.47 5677.43 5753.98 80.64 13.88 MWD GMAG 198 10315.84 90.70 127.26 31. 30 4592.35 3779.10 916.75 5702.51 5775.73 80.87 4.17 MWD GMAG 199 10347.07 90.15 131. 82 31. 23 4592 .12 3810.32 896.88 5726.59 5796.39 81.10 14.71 MWD GMAG 200 10377.71 89.06 131.00 30.64 4592.33 3840.95 876.61 5749.57 5816.01 81. 33 4.45 MWD GMAG 201 10408.69 90.53 134.84 30.98 4592.44 3871.88 855.52 5772.25 5835.30 81. 57 13 .27 MWD GMAG e 202 10439.54 91.90 134.72 30.85 4591.79 3902.62 833.79 5794.14 5853.82 81.81 4.46 MWD GMAG 203 10470.84 90.63 134.88 31. 30 4591.10 3933.80 811.74 5816.34 5872.71 82.05 4.09 MWD GMAG 204 10502.36 89.40 133.61 31. 52 4591.09 3965.23 789.75 5838.92 5892.09 82.30 5.61 MWD GMAG 205 10532.27 89.02 133.17 29.91 4591.50 3995.09 769.21 5860.66 5910.92 82.52 1. 94 MWD GMAG 206 10563.29 87.89 133.03 31.02 4592.34 4026.05 748.02 5883.30 5930.66 82.75 3.67 MWD GMAG 207 10595.16 87.24 132.13 31.87 4593.69 4057.86 726.48 5906.74 5951. 25 82.99 3.48 MWD GMAG 208 10625.40 87.21 132.23 30.24 4595.15 4088.04 706.19 5929.13 5971. 03 83.21 0.34 MWD GMAG 209 10656.58 87.41 132.73 31.18 4596.62 4119.16 685.16 5952.10 5991.40 83.43 1. 73 MWD GMAG 210 10687.99 87.03 133.81 31. 41 4598.14 4150.48 663.66 5974.94 6011.68 83.66 3.64 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 SCHLUMBERGER Survey Report ll-Apr-2004 15:14:38 Page 9 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 211 10719.41 87.58 133.71 31. 42 4599.62 4181.80 641. 95 5997.61 6031.86 83.89 1. 78 MWD GMAG 212 10750.39 90.63 134.61 30.98 4600.10 4212.69 620.37 6019.82 6051.71 84.12 10.26 MWD GMAG 213 10781.93 91. 01 135.39 31.54 4599.65 4244.10 598.07 6042.12 6071.65 84.35 2.75 MWD GMAG 214 10812.63 91.32 135.29 30.70 4599.03 4274.66 576.24 6063.70 6091.02 84.57 1. 06 MWD GMAG 215 10843.92 90.94 134.37 31.29 4598.41 4305.84 554.19 6085.89 6111. 07 84.80 3.18 MWD GMAG 216 10875.26 90.87 134.34 31.34 4597.92 4337.08 532.28 6108.29 6131. 44 85.02 0.24 MWD GMAG e 217 10905.66 91. 28 134.49 30.40 4597 . 34 4367.39 511. 01 6130.00 6151. 26 85.23 1.44 MWD GMAG 218 10938.01 92.83 132.85 32.35 4596 .18 4399.65 488.69 6153.39 6172.76 85.46 6.97 MWD GMAG 219 10969.30 93.27 133.51 31. 29 4594.52 4430.84 467.30 6176.17 6193.82 85.67 2.53 MWD GMAG 220 10999.82 92 .21 131. 65 30.52 4593.06 4461.30 446.68 6198.62 6214.69 85.88 7.01 MWD GMAG 221 11030.30 91.18 131. 73 30.48 4592.16 4491.75 426.42 6221. 37 6235.96 86.08 3.39 MWD GMAG 222 11061.81 90.87 131.04 31. 51 4591.60 4523.24 405.59 6245.00 6258.16 86.28 2.40 MWD GMAG 223 11092.72 90.91 131.97 30.91 4591.12 4554.14 385.11 6268.15 6279.97 86.48 3.01 MWD GMAG 224 11123.41 90.94 131. 99 30.69 4590.62 4584.81 364.58 6290.96 6301. 52 86.68 0.12 MWD GMAG 225 11153.99 90.84 131. 88 30.58 4590.15 4615.37 344.15 6313.71 6323.08 86.88 0.49 MWD GMAG 226 11185.30 90.63 130.92 31. 31 4589.74 4646.66 323.44 6337.19 6345.44 87.08 3.14 MWD GMAG 227 11216.61 90.46 131.67 31. 31 4589.45 4677.96 302.78 6360.71 6367.92 87.27 2.46 MWD GMAG 228 11247.27 90.60 132.30 30.66 4589.16 4708.60 282.27 6383.50 6389.74 87.47 2.10 MWD GMAG 229 11273.99 90.39 132.13 26.72 4588.93 4735.30 264.32 6403.29 6408.74 87.64 1. 01 MWD GMAG 230 11304.91 90.49 131.96 30.92 4588.69 4766.20 243.61 6426.25 6430.87 87.83 0.64 MWD GMAG 231 11337.59 90.39 131. 48 32.68 4588.44 4798.87 221.87 6450.64 6454.46 88.03 1. 50 MWD GMAG e 232 11368.37 89.23 13 3.02 30.78 4588.54 4829.62 201.17 6473.43 6476.55 88.22 6.26 MWD GMAG 233 11403.91 86.48 133.31 35.54 4589.87 4865.08 176.88 6499.33 6501.73 88.44 7.78 MWD GMAG 234 11433.39 85.65 133.91 29.48 4591.90 4894.43 156.59 6520.62 6522.50 88.62 3.47 MWD GMAG 235 11465.45 86.55 133.21 32.06 4594.08 4926.35 134.55 6543.80 6545.18 88.82 3.55 MWD GMAG 236 11495.99 87.51 134.06 30.54 4595.66 4956.79 113.51 6565.87 6566.86 89.01 4.20 MWD GMAG 237 11527.54 87.92 134.13 31.55 4596.92 4988.24 91. 57 6588.52 6589.15 89.20 1.32 MWD GMAG 238 11559.80 85.90 134.51 32.26 4598.66 5020.36 69.07 6611. 56 6611. 92 89.40 6.37 MWD GMAG 239 11590.10 85.31 133.86 30.30 4600.98 5050.49 48.01 6633.22 6633.40 89.59 2.89 MWD GMAG 240 11622.43 85.28 133.20 32.33 4603.63 5082.65 25.82 6656.58 6656.64 89.78 2.04 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 - - SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 10 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 241 11652.81 85.93 134.53 30.38 4605.96 5112.87 4.83 6678 .42 6678.42 89.96 4.86 MWD GMAG 242 11683.81 87.24 135.20 31. 00 4607.81 5143.70 -17.00 6700.35 6700.38 90.15 4.74 MWD GMAG 243 11714.53 86.52 136.13 30.72 4609.48 5174.22 -38.94 6721.79 6721. 90 90.33 3.82 MWD GMAG 244 11746.62 84.86 137.38 32.09 4611.89 5206.00 -62.25 6743.71 6744.00 90.53 6.47 MWD GMAG 245 11775.98 85.39 137.24 29.36 4614.38 5235.02 -83.75 6763.55 6764.07 90.71 1. 87 MWD GMAG 246 11808.31 85.83 137.57 32.33 4616.86 5266.98 -107.48 6785.37 6786.22 90.91 1. 70 MWD GMAG e 247 11840.09 85.93 137.75 31.78 4619.14 5298.40 -130.91 6806.72 6807.97 91.10 0.65 MWD GMAG 248 11870.70 86.55 13 7.63 30.61 4621.15 5328.67 -153.50 6827.28 6829.00 91. 29 2.06 MWD GMAG 249 11901.83 87.10 137.18 31.13 4622.87 5359.49 -176.38 6848.31 6850.58 91. 48 2.28 MWD GMAG 250 11932.56 87.68 136.25 30.73 4624.27 5389.97 -198.73 6869.36 6872.23 91. 66 3.56 MWD GMAG 251 11962.87 86.28 135.72 30.31 4625.87 5420.08 -220.49 6890.39 6893.92 91. 83 4.94 MWD GMAG 252 11994.11 85.60 136.26 31. 24 4628.08 5451. 07 -242.91 6912.04 6916.31 92.01 2.78 MWD GMAG 253 12026.45 86.11 137.81 32.34 4630.42 5483.08 -266.51 6934.02 6939.14 92.20 5.03 MWD GMAG 254 12057.89 87.69 139.62 31. 44 4632.12 5514.11 -290.10 6954.74 6960.78 92.39 7.64 MWD GMAG 255 12088.96 89.61 14 0 . 64 31. 07 4632.85 5544.68 -313.94 6974.65 6981.71 92.58 7.00 MWD GMAG 256 12120.20 91. 39 142.38 31. 24 4632.58 5575.29 -338.39 6994.09 7002.27 92.77 7.97 MWD GMAG 257 12151.36 90.50 141.75 31.16 4632.07 5605.76 -362.96 7013.24 7022.63 92.96 3.50 MWD GMAG 258 12184.17 89.82 140.16 32.81 4631.97 5637.97 -388.44 7033.91 7044.63 93.16 5.27 MWD GMAG 259 12214.53 89.23 140.61 30.36 4632.23 5667.83 -411.83 7053.27 7065.28 93.34 2.44 MWD GMAG 260 12244.70 89.34 139.09 30.17 4632.60 5697.55 -434.88 7072.72 7086.07 93.52 5.05 MWD GMAG e 261 12276.71 90.13 140.15 32.01 4632.75 5729.11 -459.27 7093.45 7108.31 93.70 4.13 MWD GMAG 262 12307.18 92.22 137.75 30.47 4632.12 5759.20 -482.24 7113.46 7129.78 93.88 10.44 MWD GMAG 263 12337.88 90.95 136.14 30.70 4631.28 5789.66 -504.66 7134.41 7152.23 94.05 6.68 MWD GMAG 264 12369.27 91. 08 136.89 31. 39 4630.72 5820.84 -527.43 7156.00 7175.42 94.22 2.42 MWD GMAG 265 12399.96 90.43 137.44 30.69 4630.31 5851. 29 -549.93 7176.87 7197.91 94.38 2.77 MWD GMAG 266 12430.08 88.72 134.74 30.12 4630.54 5881. 24 -571. 63 7197.75 7220.42 94.54 10.61 MWD GMAG 267 12461.86 88.79 133.31 31.78 4631.23 5912.93 -593.71 7220.60 7244.97 94.70 4.50 MWD GMAG 268 12494.10 89.75 130.05 32.24 4631. 64 5945.15 -615.14 7244.67 7270.74 94.85 10.54 MWD GMAG 269 12524.92 89.03 130.17 30.82 4631. 97 5975.97 -635.00 7268.24 7295.93 94.99 2.37 MWD GMAG 270 12556.16 89.89 127.82 31. 24 4632.26 6007.20 -654.66 7292.52 7321.85 95.13 8.01 MWD GMAG [(c) 2004 IDEAL ID8 1C 02 SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 11 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 271 12587.55 88.24 125.67 31. 39 4632.77 6038.53 -673.43 7317.67 7348.59 95.26 8.63 MWD GMAG 272 12619.29 87.07 125.12 31. 74 4634.07 6070.14 -691.80 7343.52 7376.03 95.38 4.07 MWD GMAG 273 12649.85 86.73 121. 21 30.56 4635.73 6100.43 -708.49 7369.06 7403.04 95.49 12.82 MWD GMAG 274 12679.55 86.35 120.06 29.70 4637.52 6129.68 -723.59 7394.57 7429.88 95.59 4.07 MWD GMAG 275 12711.28 86.15 119.79 31.73 4639.59 6160.86 -739.39 7422.01 7458.75 95.69 1. 06 MWD GMAG e 276 12741.92 85.90 119.47 30.64 4641. 72 6190.93 -754.50 7448.58 7486.69 95.78 1. 32 MWD GMAG 277 12772.92 87.93 118.89 31. 00 4643.39 6221. 33 -769.59 7475.60 7515.11 95.88 6.81 MWD GMAG 278 12804.48 88.31 118.02 31. 56 4644.42 6252.23 -784.62 7503.33 7544.25 95.97 3.01 MWD GMAG 279 12835.21 87.90 116.82 30.73 4645.44 6282.21 -798.77 7530.60 7572.84 96.05 4.12 MWD GMAG 280 12866.50 87.55 118.42 31. 29 4646.68 6312.75 -813.26 7558.30 7601. 92 96.14 5.23 MWD GMAG 281 12898.51 87.31 118.35 32.01 4648.12 6344.07 -828.46 7586.43 7631.53 96.23 0.78 MWD GMAG 282 12929.86 87.21 117.92 31. 35 4649.61 6374.71 -843.23 7614.04 7660.59 96.32 1.41 MWD GMAG 283 12960.59 87.90 118.52 30.73 4650.93 6404.77 -857.75 7641.10 7689.09 96.40 2.97 MWD GMAG 284 12991.92 87.11 117.34 31. 33 4652.29 6435.38 -872.41 7668.75 7718.21 96 .49 4.53 MWD GMAG 285 13023.23 87.45 117.92 31. 31 4653.78 6465.93 -886.91 7696.46 7747.39 96 .57 2.15 MWD GMAG 286 13054.15 89.10 120.42 30.92 4654.71 6496.28 -901.97 7723.44 7775.93 96.66 9.68 MWD GMAG 287 13084.40 89.47 120.63 30.25 4655.08 6526.11 -917.34 7749.50 7803.60 96.75 1.41 MWD GMAG 288 13115.86 88.79 122.02 31. 46 4655.56 6557.21 -933.69 7776.37 7832.22 96.85 4.92 MWD GMAG 289 13146.46 87.48 119.53 30.60 4656.56 6587.39 -949.34 7802.64 7860.18 96.94 9.19 MWD GMAG e 290 13177.88 87.83 119.79 31.42 4657.84 6618.28 -964.87 7829.92 7889.15 97.03 1.39 MWD GMAG 291 13208.91 88.55 120.17 31. 03 4658.82 6648.82 -980.37 7856.79 7917.71 97.11 2.62 MWD GMAG 292 13240.02 88.27 119.66 31.11 4659.69 6679.43 -995.88 7883.74 7946.39 97.20 1. 87 MWD GMAG 293 13271.54 87.42 118.99 31. 52 4660.87 6710.39 -1011.30 7911.20 7975.58 97.28 3.43 MWD GMAG 294 13302.99 89.10 120.67 31. 45 4661. 83 6741.33 -1026.94 7938.47 8004.62 97.37 7.55 MWD GMAG 295 13333.78 89.92 121.86 30.79 4662.09 6771. 76 -1042.92 7964.79 8032.78 97.46 4.69 MWD GMAG 296 13365.40 89.58 120.94 31. 62 4662.23 6803.02 -1059.39 7991.78 8061.69 97.55 3.10 MWD GMAG 297 13396.71 89.17 121.08 31. 31 4662.57 6833.94 -1075.52 8018.61 8090.42 97.64 1. 38 MWD GMAG 298 13427.23 88.89 121. 75 30.52 4663.09 6864.12 -1091. 43 8044.65 8118.35 97.73 2.38 MWD GMAG 299 13458.53 88.55 121. 86 31.30 4663.78 6895.09 -1107.92 8071.24 8146.93 97.82 1.14 MWD GMAG 300 13488.53 89.27 124.04 30.00 4664.36 6924.86 -1124.23 8096.41 8174.09 97.91 7.65 MWD GMAG or . . [(c)2004 IDEAL ID8 1C 02 SCHLUMBERGER Survey Report 11-Apr-2004 15:14:38 Page 12 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 301 13540.00 89.27 124.04 51.47 4665.01 6976.04 -1153.04 8139.06 8220.33 98.06 0.00 Projection to TD [(c)2004 IDEAL ID8 1C_02] e e SCHLUMBERGER Survey report Client.. ........ .........: BP Exploration INc. Field. . . . . . . . . . . . . . . . . . . .: Orion Well. . . . . . . . . . . . . . . . . . . . .: L-201 L1 PB1 API number.... .... .......: 50-029- 23202-72 Engineer......... ........: M. Perdomo RIG: . . . . . . . . . . . . . . . . . . . . .: NABORS 9ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions. ....: Minimum curvature Method for DLS........ ...: Mason & Taylor ----- Depth reference ----------------------- Permanent datum... .......: MEAN SEA LEVEL Depth reference.. ........: Driller's Pipe Tally GL above permanent..... ..: 50.20 ft KB above permanent.......: NjA Top Drive ft DF above permanent.......: 78.70 ft ----- Vertical section origin---------------- Latitude (+NjS-).... .....: 0.00 ft Departure (+EjW-). .......: 0.00 ft ----- Platform reference point--------------- Latitude (+NjS-) .........: N 70.35073717 ft Departure (+EjW-)..... ...: W 149.32347531 ft Azimuth from rotary table to target: 130.00 degrees [(c)2004 IDEAL ID8 1C 01 11-Apr-2004 15:14:38 Spud date.... ....... .....: Last survey date.. .......: Total accepted surveys...: MD of first survey.......: MD of last survey........: Page 1 of 10 05-Apr-2004 10-Apr-04 257 0.00 ft 12172.00 ft ----- Geomagnetic data ---------------------- Magnetic model...... .....: BGGM version 2003 Magnetic date....... .....: 20-Mar-2004 Magnetic field strength..: 1151.21 HCNT Magnetic dec (+EjW-) .....: 25.03 degrees Magnetic dip. ...... ......: 80.82 degrees ----- MWD survey Reference Reference G.... . . . . . . . . . . : Reference H..... ...... ...: Reference Dip... ....... ..: Tolerance of G........ ...: Tolerance of H.... .......: Tolerance of Dip.... .....: Criteria --------- 1002.68 mGal 1151. 21 HCNT 80.82 degrees (+j-) 2.50 mGal (+j-) 6.00 HCNT (+j-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+EjW-).....: 25.03 degrees Grid convergence (+EjW-).: 0.00 degrees Total az corr (+EjW-). ...: 25.03 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction - f'- '~ ...) r.;.:::) I ::s-- (.-=:> ~ - SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 2 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYR None 3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYR None 4 324.00 2.13 19.40 100.00 323.97 -1. 57 2.37 -0.05 2.38 358.72 1. 76 GYR None 5 395.00 4.15 21.01 71.00 394.86 -2.87 6.02 1. 31 6.16 12.25 2.85 GYR None 6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYR None e 7 595.00 8.86 11. 46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYR None 8 695.00 11.87 12.48 100.00 691.99 -20.13 44.33 10.92 45.65 13.83 3.02 GYR None 9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG 10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21.32 86.02 14.35 3.12 MWD GMAG 11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115 . 96 14.89 2.38 MWD GMAG 12 1040.82 22.84 16.89 93.36 1021. 28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG 13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG 14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG 15 1321.50 29.42 18.07 95.37 1272.00 -111.15 264.57 76.90 275.52 16.21 1. 53 MWD GMAG 16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91.86 323.53 16.49 1. 77 MWD GMAG 17 1511. 08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1. 83 MWD GMAG 18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG 19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG 20 1797.56 36.27 18.62 98.02 1671.38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG - 21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591. 00 17.60 0.97 MWD GMAG 22 1988.07 39.87 19.15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG 23 2081. 93 41. 57 20.11 93.86 1893.38 -267.74 677.09 218.63 711. 51 17.90 1. 93 MWD GMAG 24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG 25 2269.96 45.03 20.88 94.18 2030.82 -311.34 797.53 262.78 839.71 18.24 2.56 MWD GMAG 26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG 27 2458.33 47.95 21. 23 96.59 2161.62 -355.21 923.95 311.59 975.08 18.64 2.54 MWD GMAG 28 2552.24 48.94 21.51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG 29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG 30 2740.10 50.69 21. 63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG [ (c) 2004 IDEAL ID8 1C 01 SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 3 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 2834.26 50.10 21. 09 94.16 2405.24 -446.33 1190.40 416.22 1261. 07 19.27 0.77 MWD GMAG 32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG 33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG 34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG 35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501. 52 19.80 0.67 MWD GMAG 36 3266.50 47.43 25.10 114.34 2688.89 -541.75 1490.59 543.55 1586.61 20.03 1. 92 MWD GMAG e 37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561. 57 1630.69 20.14 - 4.16 MWD GMAG 38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG 39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG 40 3609.16 49.34 23.32 93.81 2911.68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG 41 3701.35 50.03 21.52 92 .19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1. 67 MWD GMAG 42 3794.96 50.31 21. 39 93.61 3031.29 -659.14 1860.94 701. 06 1988.61 20.64 0.32 MWD GMAG 43 3888.81 50.23 21. 33 93.85 3091.27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG 44 3982.46 49.83 20.65 93.65 3151.43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG 45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG 46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277.18 20.66 0.55 MWD GMAG 47 4266.06 48.39 21.00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG 48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG 49 4454.28 47.80 22.75 94.27 3461. 74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG 50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG e 51 4641.89 48.96 31.87 93.78 3586.62 -853.25 2451.68 943.36 2626.91 21.05 4.03 MWD GMAG 52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21. 38 3.58 MWD GMAG 53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21.82 3.66 MWD GMAG 54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG 55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG 56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG 57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG 58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG 59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG 60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451.92 3156.80 27.38 5.64 MWD GMAG [(c) 2004 IDEAL ID8 1C 01 SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 4 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG 62 5677 . 97 56.15 89.22 95.09 4255.06 -581. 22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG 63 5769.98 58.26 91.53 92.01 4304.90 -521. 65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG 64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG 65 5955.46 61. 37 98.97 93.30 4399.26 -390.85 2802.35 1841. 23 3353.10 33.31 4.62 MWD GMAG 66 6049.62 64.61 102.59 94.16 4442.03 -317.64 2786.62 1923.60 3386.08 34.62 4.85 MWD GMAG e 67 6143.03 65.95 107.59 93.41 4481.11 -240.71 2764.52 2005.48 3415.34 35.96 5.07 MWD GMAG 68 6237.33 68.65 110.96 94.30 4517.51 -159.36 2735.79 2087.57 3441. 29 37.35 4.37 MWD GMAG 69 6330.67 72.77 113.73 93.34 4548.34 -75.43 2702.28 2169.02 3465.11 38.75 5.23 TOP OF WINDOW 70 6372.00 74.45 114.96 41. 33 4560.01 -37.25 2685.94 2205.14 3475.18 39.39 4.97 BOTTTOM WINDOW 71 6384.00 76.22 115.73 12.00 4563.04 -26.02 2680.97 2215.63 3478.02 39.57 16.00 MWD Incl. Only 72 6404.88 78.82 115.47 20.88 4567.56 -6.28 2672.16 2234.02 3483.00 39.90 12.51 MWD Incl. Only 73 6436.12 81. 44 115.09 31. 24 4572.91 23.49 2659.02 2261. 84 3490.89 40.39 8.47 MWD Incl. Only 74 6467.35 85.08 114 . 71 31. 23 4576.58 53.43 2645.96 2289.97 3499.30 40.87 11.72 MWD Incl. Only 75 6498.50 89.31 114.33 31.15 4578.10 83.40 2633.05 2318.27 3508.18 41. 36 13.63 MWD Incl. Only 76 6530.44 90.86 113.95 31.94 4578.05 114.13 2619.99 2347.42 3517.77 41. 86 5.00 MWD Incl. Only 77 6561.55 92.09 113.58 31.11 4577.25 143.99 2607.46 2375.88 3527.55 42.34 4.13 MWD Incl. Only 78 6592.41 93.09 113.22 30.86 4575.86 173.53 2595.22 2404.17 3537.68 42.81 3.44 MWD Incl. Only 79 6624.01 90.26 112.85 31.60 4574.93 203.74 2582.86 2433.24 3548.49 43.29 9.03 MWD GMAG 80 6655.31 90.02 113 . 77 31. 30 4574.86 233.72 2570.47 2461.98 3559.31 43.76 3.04 MWD GMAG e 81 6685.25 92.97 114 . 91 29.94 4574.08 262.53 2558.14 2489.25 3569.37 44.22 10.56 MWD GMAG 82 6716.74 90.67 113.70 31.49 4573.08 292.83 2545.19 2517.93 3580.21 44.69 8.25 MWD GMAG 83 6747.77 89.47 117.00 31.03 4573.04 322.85 2531.90 2545.97 3590.61 45.16 11.32 MWD GMAG 84 6778.97 90.26 119.95 31. 20 4573.11 353.42 2517.03 2573.39 3599.69 45.63 9.79 MWD GMAG 85 6809.74 91.32 122.81 30.77 4572.69 383.83 2501.01 2599.65 3607.39 46.11 9.91 MWD GMAG 86 6841. 42 92.42 125.31 31. 68 4571.65 415.32 2483.28 2625.88 3614.13 46.60 8.62 MWD GMAG 87 6872.99 92 .45 123.71 31.57 4570.31 446.72 2465.41 2651.87 3620.87 47.09 5.06 MWD GMAG 88 6903.56 90.22 122.19 30.57 4569.60 477.05 2448.79 2677 . 52 3628.45 47.55 8.83 MWD GMAG 89 6934.63 87.92 119.45 31.07 4570.10 507.71 2432.87 2704.19 3637.52 48.02 11. 51 MWD GMAG 90 6966.17 89.98 121. 64 31.54 4570.68 538.81 2416.85 2731.35 3647.11 48.50 9.53 MWD GMAG [ (c) 2004 IDEAL ID8 1C 01 SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 5 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 6996.79 91. 52 120.94 30.62 4570.28 569.07 2400.95 2757.51 3656.28 48.95 5.52 MWD GMAG 92 7028.26 92 .31 122.84 31.47 4569.23 600.21 2384.33 2784.21 3665.64 49.42 6.54 MWD GMAG 93 7057.40 92.97 122.97 29.14 4567.89 629.10 2368.52 2808.65 3674.02 49.86 2.31 MWD GMAG 94 7089.66 90.94 124.36 32.26 4566.79 661.14 2350.65 2835.48 3683.14 50.34 7.62 MWD GMAG 95 7120.81 89.71 125.41 31.15 4566.61 692.16 2332.83 2861. 03 3691.56 50.81 5.19 MWD GMAG e 31.43 2886.65 96 7152.24 89.26 125.44 4566.89 723.49 2314.62 3700.02 51. 28 1.43 MWD GMAG 97 7182.85 89.09 126.42 30.61 4567.33 754.02 2296.66 2911.43 3708.24 51.73 3.25 MWD GMAG 98 7213.84 89.98 128.58 30.99 4567.58 784.98 2277.79 2936.01 3715.98 52.20 7.54 MWD GMAG 99 7245.39 88.88 127.80 31. 55 4567.90 816.51 2258.29 2960.81 3723.74 52.67 4.27 MWD GMAG 100 7276.71 88.20 128.13 31. 32 4568.70 847.80 2239.03 2985.49 3731.81 53.13 2.41 MWD GMAG 101 7306.90 88.02 128.77 30.19 4569.69 877.96 2220.27 3009.12 3739.57 53.58 2.20 MWD GMAG 102 7338.68 90.74 130.58 31. 78 4570.04 909.74 2199.98 3033.58 3747.33 54.05 10.28 MWD GMAG 103 7369.54 91.87 129.16 30.86 4569.33 940.59 2180.20 3057.25 3755.01 54.51 5.88 MWD GMAG 104 7400.91 92.35 127.28 31.37 4568.18 971. 92 2160.81 3081.88 3763.92 54.96 6.18 MWD GMAG 105 7431.85 92.11 127.90 30.94 4566.97 1002.81 2141. 95 3106.38 3773.27 55.41 2.15 MWD GMAG 106 7463.94 92.11 125.69 32.09 4565.79 1034.82 2122.74 3132.06 3783.63 55.87 6.88 MWD GMAG 107 7493.05 91.42 123.68 29.11 4564.90 1063.79 2106.19 3155.98 3794.24 56.28 7.30 MWD GMAG 108 7524.80 90.12 121.74 31.75 4564.47 1095.28 2089.03 3182.69 3807.05 56.72 7.35 MWD GMAG 109 7555.28 89.09 119.65 30.48 4564.68 1125.36 2073.47 3208.90 3820.52 57.13 7.64 MWD GMAG 110 7587.15 88.95 118.02 31.87 4565.22 1156.62 2058.11 3236.81 3835.72 57.55 5.13 MWD GMAG e 111 7617.36 88.44 116.26 30.21 4565.91 1186.06 2044.33 3263.69 3851.10 57.94 6.06 MWD GMAG 112 7647.33 89.09 116.04 29.97 4566.56 1215.15 2031.12 3290.59 3866.97 58.31 2.29 MWD GMAG 113 7677.57 89.60 114.59 30.24 4566.90 1244.40 2018.20 3317.92 3883.52 58.69 5.08 MWD GMAG 114 7708.53 90.12 114.06 30.96 4566.98 1274.21 2005.44 3346.13 3901. 08 59.06 2.40 MWD GMAG 115 7739.39 90.12 115.48 30.86 4566.91 1303.99 1992.51 3374.15 3918.55 59.44 4.60 MWD GMAG 116 7769.77 90.15 114.37 30.38 4566.84 1333.32 1979.71 3401.70 3935.84 59.80 3.66 MWD GMAG 117 7800.51 89.81 114.58 30.74 4566.85 1362.94 1966.98 3429.68 3953.69 60.17 1. 30 MWD GMAG 118 7830.73 89.57 114.06 30.22 4567.02 1392.03 1954.53 3457.22 3971.46 60.52 1. 90 MWD GMAG 119 7860.94 89.91 113.75 30.21 4567.15 1421.06 1942.29 3484.83 3989.56 60.87 1.52 MWD GMAG 120 7891.93 89.64 114.24 30.99 4567.28 1450.85 1929.69 3513.15 4008.23 61. 22 1. 81 MWD GMAG [(c) 2004 IDEAL ID8 1C 01 SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 6 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (de g) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 121 7922.42 87.99 113.27 30.49 4567.91 1480.11 1917.41 3541. 04 4026.84 61. 57 6.28 MWD GMAG 122 7952.82 86.82 111. 52 30.40 4569.28 1509.06 1905.84 3569.12 4046.09 61. 90 6.92 MWD GMAG 123 7983.67 89.33 113.81 30.85 4570.32 1538.49 1893.96 3597.57 4065.66 62.24 11. 01 MWD GMAG 124 8014.45 91. 08 114.14 30.78 4570.21 1568.07 1881.45 3625.69 4084.79 62.57 5.79 MWD GMAG 125 8045.57 91. 25 112.93 31. 12 4569.58 1597.91 1869.03 3654.22 4104.46 62.91 3.93 MWD GMAG e 126 8076.05 91.11 112.84 30.48 4568.95 1627.03 1857.18 3682.29 4124.12 63.24 0.55 MWD GMAG 127 8106.65 90.56 113.29 30.60 4568.50 1656.30 1845.19 3710.44 4143.92 63.56 2.32 MWD GMAG 128 8137.26 91. 01 114.11 30.61 4568.08 1685.68 1832.89 3738.47 4163.61 63.88 3.06 MWD GMAG 129 8168.01 90.87 112.06 30.75 4567.58 1715.09 1820.83 3766.75 4183.76 64.20 6.68 MWD GMAG 130 8199.28 89.36 109.99 31. 27 4567.52 1744.66 1809.61 3795.94 4205.22 64.51 8.19 MWD GMAG 131 8229.84 89.30 108.59 30.56 4567.87 1773.24 1799.52 3824.78 4226.96 64.80 4.59 MWD GMAG 132 8260.46 88.75 106.32 30.62 4568.39 1801. 51 1790.34 3853.98 4249.53 65.08 7.63 MWD GMAG 133 8291.36 89.43 107.50 30.90 4568.88 1829.94 1781. 35 3883.54 4272.60 65.36 4.41 MWD GMAG 134 8323.15 90.67 108.12 31.79 4568.86 1859.37 1771 . 63 3913.81 4296 .11 65.65 4.36 MWD GMAG 135 8354.13 90.56 107.75 30.98 4568.52 1888.08 1762.09 3943.28 4319.08 65.92 1.25 MWD GMAG 136 8384.87 90.12 107.21 30.74 4568.34 1916.48 1752.86 3972.60 4342.13 66.19 2.27 MWD GMAG 137 8415.30 88.47 106.43 30.43 4568.72 1944.44 1744.05 4001.72 4365.26 66.45 6.00 MWD GMAG 138 8447.69 89.36 107.40 32.39 4569.33 1974.24 1734.63 4032.71 4389.95 66.73 4.06 MWD GMAG 139 8478.65 90.70 109.62 30.96 4569.31 2003.04 1724.80 4062.06 4413.08 66.99 8.38 MWD GMAG 140 8509.62 92.66 110.01 30.97 4568.41 2032.09 1714.31 4091.19 4435.84 67.27 6.45 MWD GMAG e 141 8541.08 92.86 109.90 31. 46 4566.89 2061.61 1703.58 4120.72 4458.98 67.54 0.73 MWD GMAG 142 8571. 91 92.72 108.98 30.83 4565.39 2090.45 1693.33 4149.76 4481. 95 67.80 3.01 MWD GMAG 143 8603.14 92.18 110.47 31. 23 4564.06 2119.71 1682.80 4179.13 4505.21 68.07 5.07 MWD GMAG 144 8634.38 88.92 109.35 31. 24 4563.76 2149.05 1672.17 4208.50 4528.53 68.33 11.03 MWD GMAG 145 8665.48 87.30 109.79 31.10 4564.78 2178.17 1661.76 4237.78 4551.95 68.59 5.40 MWD GMAG 146 8696.92 87.07 109.71 31.44 4566.33 2207.64 1651.15 4267.34 4575.64 68.85 0.77 MWD GMAG 147 8728.38 87.00 109.56 31. 46 4567.95 2237.09 1640.59 4296.93 4599.47 69.10 0.53 MWD GMAG 148 8759.09 87.37 109.85 30.71 4569.46 2265.86 1630.25 4325.80 4622.80 69.35 1.53 MWD GMAG 149 8791.07 87.13 110.95 31. 98 4571.00 2295.95 1619.11 4355.74 4646.94 69.61 3.52 MWD GMAG 150 8822.42 85.45 113.38 31.35 4573.02 2325.73 1607.31 4384.71 4670.03 69.87 9.41 MWD GMAG [ (c) 2004 IDEAL ID8 1C 01 SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 7 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (de g) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 151 8853.19 85.21 111.55 30.77 4575.53 2354.97 1595.59 4413.05 4692.65 70.12 5.98 MWD GMAG 152 8884.30 84.80 111. 59 31.11 4578.24 2384.37 1584.20 4441. 87 4715.92 70.37 1. 32 MWD GMAG 153 8916.32 84.62 112.56 32.02 4581.19 2414.71 1572.22 4471. 42 4739.78 70.63 3.07 MWD GMAG 154 8946.42 85.04 114.27 30.10 4583.90 2443.44 1560.30 4498.93 4761.82 70.87 5.83 MWD GMAG 155 8978.21 86.24 116.51 31.79 4586.32 2474.11 1546.71 4527.56 4784.47 71. 14 7.98 MWD GMAG e 156 9009.58 89.09 119.57 31.37 4587.60 2504.76 1531.98 4555.22 4805.93 71.41 13.32 MWD GMAG 157 9041. 71 90.63 118.97 32.13 4587.68 2536.33 1516.27 4583.25 4827.55 71.69 5.14 MWD GMAG 158 9072.65 90.43 118.64 30.94 4587.39 2566.68 1501.37 4610.36 4848.66 71. 96 1.25 MWD GMAG 159 9103.96 88.06 119.27 31. 31 4587.80 2597.41 1486.21 4637.75 4870.07 72.23 7.83 MWD GMAG 160 9134.01 87.17 119.06 30.05 4589.05 2626.89 1471.58 4663.97 4890.62 72.49 3.04 MWD GMAG 161 9165.46 88.61 123.39 31. 45 4590.21 2657.95 1455.29 4690.84 4911.40 72.76 14.50 MWD GMAG 162 9197.72 89.09 123.47 32.26 4590.86 2689.99 1437.52 4717.75 4931.90 73.05 1.51 MWD GMAG 163 9227.58 89.19 124.58 29.86 4591.31 2719.68 1420.82 4742.50 4950.76 73.32 3.73 MWD GMAG 164 9257.44 90.32 126.34 29.86 4591. 44 2749.45 1403.49 4766.82 4969.14 73.59 7.00 MWD GMAG 165 9289.25 91. 73 124.85 31. 81 4590.87 2781.16 1384.98 4792.68 4988.78 73.88 6.45 MWD GMAG 166 9320.84 91.70 125.41 31. 59 4589.92 2812.62 1366.81 4818.50 5008.61 74.16 1. 77 MWD GMAG 167 9351.30 89.71 124.79 30.46 4589.55 2842.96 1349.30 4843.42 5027.86 74.43 6.84 MWD GMAG 168 9383.28 89.06 121. 44 31. 98 4589.89 2874.71 1331. 83 4870.20 5049.02 74.71 10.67 MWD GMAG 169 9415.66 88.64 119.19 32.38 4590.54 2906.62 1315.49 4898.15 5071.72 74.97 7.07 MWD GMAG 170 9445.51 88.64 118.31 29.85 4591.25 2935.88 1301.14 4924.31 5093.31 75.20 2.95 MWD GMAG e 171 9476.77 88.06 118.15 31. 26 4592.15 2966.47 1286.36 4951.84 5116.19 75.44 1. 92 MWD GMAG 172 9508.40 88.92 118.02 31. 63 4592.98 2997.41 1271.47 4979.73 5139.49 75.68 2.75 MWD GMAG 173 9539.49 91. 45 117.69 31. 09 4592.88 3027.80 1256.95 5007.22 5162.57 75.91 8.21 MWD GMAG 174 9570.67 91. 69 115.99 31.18 4592.03 3058.15 1242.88 5035.03 5186.16 76.13 5.50 MWD GMAG 175 9601.60 90.73 115.66 30.93 4591.37 3088.13 1229.41 5062.86 5209.99 76.35 3.28 MWD GMAG 176 9632.44 90.02 116.19 30.84 4591.17 3118.05 1215.92 5090.60 5233.80 76.57 2.87 MWD GMAG 177 9664.07 90.77 116.77 31.63 4590.95 3148.80 1201. 82 5118.91 5258.10 76.79 3.00 MWD GMAG 178 9693.72 90.53 117.22 29.65 4590.62 3177.68 1188.36 5145.33 5280.78 77.00 1. 72 MWD GMAG 179 9725.05 90.39 117.34 31. 33 4590.37 3208.24 1174.00 5173.17 5304.71 77 .21 0.59 MWD GMAG 180 9756.38 90.36 116.36 31. 33 4590.16 3238.75 1159.85 5201.12 5328.88 77.43 3.13 MWD GMAG [ (c) 2004 IDEAL ID8 1C 01 - - SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 8 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 181 9787.10 90.05 116.02 30.72 4590.05 3268.58 1146.30 5228.69 5352.87 77.63 1. 50 MWD GMAG 182 9818.66 89.12 112.37 31.56 4590.28 3298.94 1133.36 5257.47 5378.24 77.83 11.93 MWD GMAG 183 9850.03 89.60 112.41 31. 37 4590.63 3328.84 1121. 42 5286.47 5404.11 78.02 1. 54 MWD GMAG 184 9880.60 91. 39 111.26 30.57 4590.37 3357.89 1110.05 5314.85 5429.53 78.20 6.96 MWD GMAG 185 9911. 56 90.43 109.87 30.96 4589.87 3387.08 1099.17 5343.83 5455.70 78.38 5.46 MWD GMAG e 186 9943.42 90.12 110.07 31. 86 4589.72 3417.01 1088.29 5373.77 5482.87 78.55 1.16 MWD GMAG 187 9974.09 90.05 111.70 30.67 4589.68 3445.99 1077.36 5402.43 5508.81 78.72 5.32 MWD GMAG 188 10004.93 89.88 111 . 98 30.84 4589.69 3475.29 1065.89 5431.05 5534.66 78.90 1. 06 MWD GMAG 189 10036.15 90.39 112.91 31.22 4589.62 3505.06 1053.97 5459.91 5560.71 79.07 3.40 MWD GMAG 190 10067.08 89.09 112.34 30.93 4589.76 3534.57 1042.07 5488.46 5586.51 79.25 4.59 MWD GMAG 191 10098.67 88.85 114.23 31. 59 4590.33 3564.82 1029.58 5517.47 5612.71 79.43 6.03 MWD GMAG 192 10130.00 89.16 116.60 31. 33 4590.87 3595.14 1016.14 5545.76 5638.08 79.62 7.63 MWD GMAG 193 10160.91 89.29 120.23 30.91 4591.29 3625.41 1001. 44 5572.94 5662.20 79.81 11. 75 MWD GMAG 194 10191. 71 88.78 121. 93 30.80 4591.81 3655.83 985.54 5599.31 5685.38 80.02 5.76 MWD GMAG 195 10222.85 88.68 121. 29 31.14 4592.50 3686.63 969.22 5625.83 5708.70 80.23 2.08 MWD GMAG 196 10253.90 89.12 122.65 31.05 4593.10 3717.37 952.78 5652.16 5731.90 80.43 4.60 MWD GMAG 197 10284.54 91.46 126.20 30.64 4592.94 3747.86 935.47 5677.43 5753.98 80.64 13.88 MWD GMAG 198 10315.84 90.70 127.26 31. 30 4592.35 3779.10 916.75 5702.51 5775.73 80.87 4.17 MWD GMAG 199 10347.07 90.15 131.82 31. 23 4592.12 3810.32 896.88 5726.59 5796.39 81.10 14.71 MWD GMAG 200 10377.71 89.06 131.00 30.64 4592.33 3840.95 876.61 5749.57 5816.01 81. 33 4.45 MWD GMAG e 201 10408.69 90.53 134.84 30.98 4592.44 3871.88 855.52 5772.25 5835.30 81. 57 13 .27 MWD GMAG 202 10439.54 91.90 134.72 30.85 4591.79 3902.62 833.79 5794.14 5853.82 81.81 4.46 MWD GMAG 203 10470.84 90.63 134.88 31. 30 4591.10 3933.80 811. 74 5816.34 5872.71 82.05 4.09 MWD GMAG 204 10502.36 89.40 133.61 31. 52 4591.09 3965.23 789.75 5838.92 5892.09 82.30 5.61 MWD GMAG 205 10532.27 89.02 133.17 29.91 4591.50 3995.09 769.21 5860.66 5910.92 82.52 1. 94 MWD GMAG 206 10563.29 87.89 133.03 31.02 4592.34 4026.05 748.02 5883.30 5930.66 82.75 3.67 MWD GMAG 207 10595.16 87.24 132.13 31.87 4593.69 4057.86 726.48 5906.74 5951.25 82.99 3.48 MWD GMAG 208 10625.40 87.21 132.23 30.24 4595.15 4088.04 706.19 5929.13 5971 . 03 83.21 0.34 MWD GMAG 209 10656.58 87.41 132.73 31.18 4596.62 4119.16 685.16 5952.10 5991.40 83.43 1. 73 MWD GMAG 210 10687.99 87.03 133.81 31. 41 4598.14 4150.48 663.66 5974.94 6011.68 83.66 3.64 MWD GMAG [ (c) 2004 IDEAL ID8 1C 01 SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 9 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 211 10719.41 87.58 133.71 31. 42 4599.62 4181.80 641. 95 5997.61 6031.86 83.89 1. 78 MWD GMAG 212 10750.39 90.63 134.61 30.98 4600.10 4212.69 620.37 6019.82 6051.71 84.12 10.26 MWD GMAG 213 10781.93 91. 01 135.39 31.54 4599.65 4244.10 598.07 6042.12 6071.65 84.35 2.75 MWD GMAG 214 10812.63 91. 32 135.29 30.70 4599.03 4274.66 576.24 6063.70 6091. 02 84.57 1. 06 MWD GMAG 215 10843.92 90.94 134.37 31. 29 4598.41 4305.84 554.19 6085.89 6111.07 84.80 3.18 MWD GMAG e 216 10875.26 90.87 134.34 31.34 4597.92 4337.08 532.28 6108.29 6131. 44 85.02 0.24 MWD GMAG 217 10905.66 91. 28 134.49 30.40 4597.34 4367.39 511. 01 6130.00 6151.26 85.23 1.44 MWD GMAG 218 10938.01 92.83 132.85 32.35 4596 .18 4399.65 488.69 6153.39 6172.76 85.46 6.97 MWD GMAG 219 10969.30 93.27 133.51 31. 29 4594.52 4430.84 467.30 6176.17 6193.82 85.67 2.53 MWD GMAG 220 10999.82 92 .21 131.65 30.52 4593.06 4461.30 446.68 6198.62 6214.69 85.88 7.01 MWD GMAG 221 11030.30 91.18 131. 73 30.48 4592.16 4491. 75 426.42 6221.37 6235.96 86.08 3.39 MWD GMAG 222 11061.81 90.87 131.04 31.51 4591.60 4523.24 405.59 6245.00 6258.16 86.28 2.40 MWD GMAG 223 11092.72 90.91 131. 97 30.91 4591.12 4554.14 385.11 6268.15 6279.97 86.48 3.01 MWD GMAG 224 11123.41 90.94 131. 99 30.69 4590.62 4584.81 364.58 6290.96 6301.52 86.68 0.12 MWD GMAG 225 11153.99 90.84 131. 88 30.58 4590.15 4615.37 344.15 6313.71 6323.08 86.88 0.49 MWD GMAG 226 11185.30 90.63 130.92 31. 31 4589.74 4646.66 323.44 6337.19 6345.44 87.08 3.14 MWD GMAG 227 11216.61 90.46 131. 67 31. 31 4589.45 4677.96 302.78 6360.71 6367.92 87.27 2.46 MWD GMAG 228 11247.27 90.60 132.30 30.66 4589.16 4708.60 282.27 6383.50 6389.74 87.47 2.10 MWD GMAG 229 11273.99 90.39 132.13 26.72 4588.93 4735.30 264.32 6403.29 6408.74 87.64 1. 01 MWD GMAG 230 11304.91 90.49 131.96 30.92 4588.69 4766.20 243.61 6426.25 6430.87 87.83 0.64 MWD GMAG e 231 11337.59 90.39 131. 48 32.68 4588.44 4798.87 221. 87 6450.64 6454.46 88.03 1. 50 MWD GMAG 232 11368.37 89.23 133.02 30.78 4588.54 4829.62 201.17 6473.43 6476.55 88.22 6.26 MWD GMAG 233 11403.91 86.48 133.31 35.54 4589.87 4865.08 176.88 6499.33 6501. 73 88.44 7.78 MWD GMAG 234 11433.39 85.65 133.91 29.48 4591.90 4894.43 156.59 6520.62 6522.50 88.62 3.47 MWD GMAG 235 11465.45 86.55 133.21 32.06 4594.08 4926.35 134.55 6543.80 6545.18 88.82 3.55 MWD GMAG 236 11495.99 87.51 134.06 30.54 4595.66 4956.79 113.51 6565.87 6566.86 89.01 4.20 MWD GMAG 237 11527.54 87.92 134.13 31.55 4596.92 4988.24 91. 57 6588.52 6589.15 89.20 1. 32 MWD GMAG 238 11559.80 85.90 134.51 32.26 4598.66 5020.36 69.07 6611.56 6611.92 89.40 6.37 MWD GMAG 239 11590.10 85.31 133.86 30.30 4600.98 5050.49 48.01 6633.22 6633.40 89.59 2.89 MWD GMAG 240 11622.43 85.28 133.20 32.33 4603.63 5082.65 25.82 6656.58 6656.64 89.78 2.04 MWD GMAG [(c) 2004 IDEAL ID8 1C 01 " SCHLUMBERGER Survey Report 11-Apr-2004 16:14:06 Page 10 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 241 11652.81 85.93 134.53 30.38 4605.96 5112.87 4.83 6678.42 6678.42 89.96 4.86 MWD GMAG 242 11683.81 87.24 135.20 31.00 4607.81 5143.70 -17.00 6700.35 6700.38 90.15 4.74 MWD GMAG 243 11714.53 86.52 136.13 30.72 4609.48 5174.22 -38.94 6721.79 6721. 90 90.33 3.82 MWD GMAG 244 11746.62 84.86 137.38 32.09 4611.89 5206.00 -62.25 6743.71 6744.00 90.53 6.47 MWD GMAG 245 11775.98 85.39 13 7.24 29.36 4614.38 5235.02 -83.75 6763.55 6764.07 90.71 1. 87 MWD GMAG e 246 11808.31 85.83 137.57 32.33 4616.86 5266.98 -107.48 6785.37 6786.22 90.91 1. 70 MWD GMAG 247 11840.09 85.93 137.75 31.78 4619.14 5298.40 -130.91 6806.72 6807.97 91.10 0.65 MWD GMAG 248 11870.70 86.55 137.63 30.61 4621.15 5328.67 -153.50 6827.28 6829.00 91. 29 2.06 MWD GMAG 249 11901.83 87.10 137.18 31.13 4622.87 5359.49 -176.38 6848.31 6850.58 91. 48 2.28 MWD GMAG 250 11932.56 87.68 136.25 30.73 4624.27 5389.97 -198.73 6869.36 6872.23 91. 66 3.56 MWD GMAG 251 11963.33 88.27 137.19 30.77 4625.36 5420.51 -221.11 6890.44 6893.99 91.84 3.61 MWD GMAG 252 11994.22 91. 22 136.25 30.89 4625.50 5451.19 -243.60 6911. 62 6915.91 92.02 10.02 MWD GMAG 253 12026.77 90.60 134.39 32.55 4624.98 5483.59 -266.74 6934.50 6939.63 92 .20 6.02 MWD GMAG 254 12057.23 91.63 135.13 30.46 4624.39 5513.94 -288.18 6956.12 6962.09 92.37 4.16 MWD GMAG 255 12088.84 92.55 133.69 31. 61 4623.24 5545.43 -310.29 6978.69 6985.58 92.55 5.40 MWD GMAG 256 12119.68 92.04 132.79 30.84 4622.00 5576.20 -331.40 7001.14 7008.97 92.71 3.35 MWD GMAG 257 12172.00 92.04 132.79 52.32 4620.14 5628.43 -366.92 7039.51 7049.06 92.98 0.00 Projection to TD [(c) 2004 IDEAL ID8 1C 01] e - . . Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason Well No L-201 L1 Date Dispatched: 12-Apr-04 Installation/Rig Nabors 9ES Dispatched By: N.Rose Data No Of Prints No of Floppies Surveys 2 Received By: ~J oUJ S- ¡11 ~ ~ 0 Ò ~ Please sign and return to: Drilling & Measurements LWD Division 2525 Gambell Street, Suite 400 Anchorage, Alaska 99503 nrosel@slb,com Fax: 907-561-8417 LWD Log DeliveryV1.1, 10-02-03 ~ov( - rJ <--t ì Schlumberger Private e e e Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason Well No L-201 L1 PB1 Date Dispatched: 12-Apr-04 Installation/Rig Nabors 9ES Dispatched By: N. Rose Data No Of Prints No of Floppies Surveys 2 Received By: p~~ tJ¿W ~- tfVL~ AO 0 cf Please sign and return to: James H. Johnson BP Exploration (Alaska) Inc. Petrotechnical Data Center (lR2-1) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax: 907 -564-4005 e-mail address:johnsojh@bp.com LWD Log DeliveryV1.1, 10-02-03 J 0 'vI '- 0 l-[ 7 Schlumberger Private · II 1 Æ\ ~ lJ\1 FRANK H. MURKOWSKI, GOVERNOR AI,A.SIiA. OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe L-201Ll BP Exploration (Alaska) Inc. Permit No: 204-047 Surface Location: 2598' NSL, 3588' WEL, SEC. 34, TI2N, RIlE, UM Bottomhole Location: 1541' NSL, 4583' EWL, SEe. 35, T12N, Rll E, UM Dear Mr. Crane: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you ITom obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well PBU L-201, Permit Number, 204-046 API Number 50-029-23202. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to tness any required test. Contact the Commission's North Slope petroleum field inspector at 607 (pager). o~ BY ORDER .f?F THE COMMISSION DATED this~ day of March, 2004 cc: Department ofFish & Game, Habitat Section w/o encI. Department of Environmental Conservation w/o encI. W4Æ ~/~l 2.00'-{ I STATE OF ALASKA. "'-, ALAS OIL AND GAS CONSERVATION ~MMISSIOÑ PERMIT TO DRILL MAR 0 4 ZOOt o Drill II Redrill 1a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 5067' NSL, 914' WEL, SEC. 34, T12N, R11E, UM (OBb) Total Depth: 1541' NSL, 4583' EWL, SEC. 35, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: X-583325 y-5978321 Zone-ASP4 16. Deviated Wells: Kickoff Depth 18..Qlilli1iø9f='rogrl!:llT! Size CasinQ 4-1/2" 20 MC 25.005Î\í. .¡. IT, ':'1' .......·'''1 11 b. Current Well Class 0 Exploratory ìt bè~elopme~t'Qi( "0 Multiple Z~ne o Stratigraphic Test 0 Service 0 DevelopmetKH3sêPIJISingle Zone 5. Bond: B Blanket 0 Single Well 11. Well Name and Number: Bond No. 2S100302630-277 PBU L-201L 1 6. Proposed Depth: 12. Field I Pool(s): MD 13536 TVD 4657 Prudhoe Bay Field I Orion 7. Property Designation: ADL ADL 028238J-Z~ <; 8. Land Use Permit: 13. Approximate Spud Date: March 13, 2004 9. Acres in Property: 2560 14. Distance to Nearest Property: 5400' Maximum Hole Angle 10. KB Elevation Planned 15. Distance to Nearest Well Within Pool (Height above GL): 78.7 feet L-119 is 350' away at top of OA 17. Maximum Anticipated Pressures in psig (see 20 MC 25.035) Downhole: 2140 psig Surface: 1680 psig 6526 ft 92° Hole 6-3/4" Weight 12.6# Grade L-80 CouplinQ LenQth IBT 5668' MD 6513' TVD MD TVD (includinQ staQe data) 4574' 13536' 4657' Uncemented Slotted Liner " J........... ....... ................:'1 Pß,I;SENT WEI.:L.Co \JOl"nON$uMMARy (To b~çolT!P/Øt~forRedriJ ANOR.~Qtry.Qperatiól'l$) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Depth MD (ft): Depth TVD 13632 4763 None 13632 4763 Structural Conductor 80' 48" 260 sx Arctic Set (Approx.) 109' 109' Surface 3160' 10-3/4" 613 sx AS Lite, 360 sx Class 'G' 3189' 2639' Intermediate 7062 7-5/8" 578 sx Class 'G' 7091' 4686' Production Liner 6541' 4-1/2" Uncemented Slotted Liner 7091' - 13632' 4686' - 4763' 20. Attachments 0 Filing Fee, $100 0 BOP Sketch B Property Plat 0 Diverter Sketch perfOration Depth TVD (ft): B Drilling Program 0 Time vs Depth Plot o Seabed Report B Drilling Fluid Program o Shallow Hazard Analysis B 20 MC 25.050 Requirements Date: Contact Michael Triolo, 564-5774 Perforation Depth MD (ft): 21. Verbal Approval: Commission Representative: 22, I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Crane Title Senior Drilling Engineer Phone See cover letter for other requirements DYes 8No ,SYes D No Permit To Drill I API Number: Number:..2.Ô 9 -07'? 50-02. r - 2..3 Z 02. - b 0 Conditions of Approval: Samples R uired DYes gNo Hydroge fide Measures D Yes ~ No . , ,-,peE CN) p'l. ORIGINAL BY ORDER OF 6~~t THE COMMISSION V Date ub In Du licate · Well Plan Summary Ger Prudhoe Bay L-201 ML Permit I Type of Well (producer or injector): 2,598' FSL, 3,588' FEL, Sec. 34, T12N, R11 E X = 583,325.34 Y = 5,978,320.84 4,813' FSL, 545' FEL, Sec. 34, T12N, R11E X = 586,340.00 Y = 5,980,570.00 Z = 4,625' TVDss 1,562' FSL, 736' FEL, Sec. 35, T12N, R11 E X = 591,470.00 Y = 5,977,380.00 Z = 4,684' TVDss L-201 L 1 OBb Target Start: 5,067' FSL, 914' FEL, Sec. 34, T12N, R11 E X = 585,967.46 Y = 5,980,820.14 Z = 4,504' TVDss L-201 L 1 OBb Target End: 1,541' FSL, 696' FEL, Sec. 35, T12N, R11 E X = 591,510.00 Y = 5,977,360.00 Z = 4,578' TVDss L-201 L2 OBa Target Start: 4,823' FSL, 544' FEL, Sec. 34, T12N, R11 E X = 586,340.00 Y = 5,980,580.00 Z = 4,465' TVDss L-201 L2 OBa Target End: 1,550' FSL, 720' FEL, Sec. 35, T12N, R11 E X = 591,486.00 Y = 5,977,369.00 Z = 4,557' TVDss - ..-.... ""'_'___m____'-'~"~~",.. - "--...~~1t.J£_-.:~~~r::_.::~:ür~_-~~:'J·~<_~~-__.::.;:iLl]l...C,k£)JJ[U:$\...;:.-___-J~--_:-~~__:_..__·~:.j::,L_ ___::.____ ':wm L-201 L3 OA Target Start: 5,222' FSL, 1,184' FEL, Sec. 34, T12N, R11E X = 585,695.78 Y = 5,980,972.12 Z = 4,415' TVDss 3,090' FSL, 4,782' FEL, Sec. 35, T12N, R11E X = 587,405.00 Y = 5,978,860.00 Z = 4,150' TVDss Suñace Location: (As-staked) L-201 OBd Target Start: L-201 OBd Target End: L-201 L3 OA Target End: I AFE Number: I ORD5M3543 I Schrader OBd, OBb, OBa and OA Multilateral Producer I ~mm' ~m1li 'm:g~ro;l,î~ KBE = 78.70' I Rig: I Nabors 9ES ./ /' I Estimated Start Date: I March 13th 2004 I I Operating days to complete: 146.86 OBd MD 13,632' Well TVDrkb: TD 4,763' Max Inc. 93° KOP 300' OBb MD 13,536' Well TVDrkb: TD 4,657' Max Inc. 92° KOP 6,526' OBa MD 13,494' Well TVDrkb: TD 4,636' Max Inc. 93° KOP 6,354' OAMD 9,668' Well TVDrkb: TD 4,444' Max Inc. 97° KOP 6,183' Target Estimates: Estimated Reserves OA I OBa I OBb I OBd: Expected Initial Rate OA I OBa I OBb I OBd: Expected 12 Month avg OA I OBa I OBb I OBd: Current Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Original Well API #: L-201 L 1 API OBb #: L-201 L2 API OBa #: L-201 L3 API OA #. Well Type: Current Status: H2S: Expected reserves 6.90 mmbbl Production rate: 4,950 bId Production rate: 2,300 bId 5,400' MD from top OA to PBU boundary (this is the closest point in the producing well section to any unit boundary) Top OA: 350' away from L -119 top OA TO: 2,270' away from L-21 0 50-029-XXXXX-00 50-029-XXXXX -60 50-029-XXXXX-61 50-029-XXXXX-62 Schrader O-sand Quadlateral Producer New well, 20" X 34" insulated conductor to be set o ppm from produced fluids (approximated to be around 10 ppm due to contaminated gas lift gas) Final Permit 3/4/04 · Grer Prudhoe Bay L-201 ML Permit OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's 84 of @ 4,400' TVDss (Estimated) BHP: BHT: Mechanical Condition Conductor: Cellar Box Height: Naber 9ES: 20" X 34", 215.5 Iblft, A53 ERW set at 109' RKB Above MSL = 50.20' KB I MSL = 78.70' Materials Needed r ., ·_II:l.,:.i1l1Ør~,__....w'r' ~;_.{IJ.;. ·nm!'.__ .. .... :~.. , .". "..g,., . J""'", . $.. ...., .$, .' "w , Jr I, ...$.>",.., J". "., . ill : ~m 3,190' 10-%",45.5#, L-80 BTC Casing (Burst: 5,210; Collapse: 2,470) 1 each 10-%", BTC Float Shoe and Float Collar 25 each 10-%" x 13-~" Bow Spring Centralizers 1 assembly FMC 11" 5m Gen 5 Wellhead System 1 lot 10-%" casing pups 5',10',20'. 1 each 1 0-%" TAM Port Collar .~'1811]1' .mwmì'......_mrrwwi~~ \ 1'-1:~~:I-T··'··_[ifJlEJIf.j:¡:II1:í,·~ 7,091' 7-%" 29.7# L-80 BTC-M Casing (Burst: 6,890; Collapse: 4,790) 1 each 7-%" BTC-M Float Shoe and Float Collar 75 each 7-%" x 9-%" Rigid Straight Blade Centralizers 20 each 7-%" Stop Rings 2 lots 7-%" casing pups 5', 10',20' 3 each 7-%" RA Tag 2 each 7-%" 29.7# L-80 BTC-M Casing Short Joint ~0tlj 4 x Production Liners: IBJiMIU, j L miL r;flûnil11lf.~ '~~I~'<!¡"'îilllt 24,300 4 ~", 12.6#, L-80, IBT-Mod Slotted Liner 607 each 4 %" x 5 %" x 8" Straight Blade Centralizers 4 each 7-%" x 4-%" Baker ZXP Liner Top Packer 4 each 4-%" Halliburton Float Shoes 3 assemblies Baker Level 3 Hookwall Hangers with LEM ~ I III 6,150' 1 each 1 each 1 each 1 each 2 each 1 each 4 each 1 each 6,150' 3 each 1 each 4-%",12.6 Ibltt, L-80, BTC-M tubing Baker PRM Production Packer 7-%" X 4-%" 11" X 4-%" FMC tubing hanger 4-1/'6", 5m Cameron Tree Halliburton XN-Nipple (3.725" ID) Halliburton X-Nipple (3.813" ID) 4-%" Baker CMD Sliding Sleeve Camco 4-%" X 1" KBG-2 Gas Litt Mandrels Phoenix pressure gauge I-wire for the Phoenix gauge Half-muleshoed joint of 4-%" IBT-M tubing 4-%" WLEG Surface and Anti-Collision Issues <;urface Shut-in Wells: L-119 will need to be shut-in for the rig move on and off L-201. ..':Iose Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile. 2 Final Permit 3/4/04 . Gr. Prudhoe Bay L-201 ML Permit Close proach Well List: .......... . .....~¥ ~'··~0.¡;·-___~19itJ~I:"1J~IiIj~íll I L-210 30.13-ft 249.39-ft 26.01-ft Use Traveling Cylinder (Gyro) L-120 47.06-ft 299.58-ft 42.05-ft Use Traveling Cylinder (Gyro) L-103 30.23-ft 449.73-ft 23.14-ft Use Traveling Cylinder (Gyro) L-119 17.33-ft 549.94-ft 8.43-ft Use Traveling Cylinder (Gyro) Mud Program 13-W' Surface Hole Mud Properties: Interval/ Density (ppg) Funnel vis 0-1,700 8.6-9.2 250-300 1,700 - 2,500 9.0 - 9.5 200 - 250 2,500 - 3,190 9.3 - 9.5 200 I Spud - Freshwater Mud YP Tauo PH Plastic Vis 50 - 70 10 - 18 8.5 - 9.0 20 - 45 30 - 45 8 - 16 8.5 - 9.0 20 - 40 30 - 40 9 - 14 8.5 - 9.0 14 - 20 Maintain Viscosity greater then 250 Ensure fluid loss below permafrost is below 6 Maintain mud temperature below 50° F 9:%;;'~è'M~d¡;~~p;rti;~--**,*"Y-l Freshwater Mud (LSÑD) "PH;'9.O" _ 9.5 ,,,_ Interval/ Density (ppg) Funnel vis I YP I Tauo I PV I API Filtrate I MBT 9.0 - 9.3 45 - 55 26 - 30 3 - 6 12 - 18 4 - 6 < 20 Maintain proper fluid rheology & lubricant concentration to achieve the directional requirements Optimize mud rheology to maximize ROP while maintaining an ECO <0.7 ppg over calculated clean hole. Reduce shaker blinding while drilling the UGNU. ~"Production Hole Mud Properties: I LVT-200 MOBM (Versa-Pro) Interval/ Density (ppg) Stability I YP I Oil: H20 Ratio I PV I API Filtrate I MBT 9.2 650 - 900 18 - 25 80 : 20 15 - 20 4 - 5.5 < 6 Minimize solids/liquid invasion by maintaining optimum PSO of bridging agents. Maintain minimal ECD's by reducing drill solids accumulation through utilization of the rigs solids control system and effective dilution. FL NC-8 8 5.5-8 Interval Specific Objectives: Interval Specific Objectives: Interval Specific Objectives: Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Oiverter, BOPE and drilling fluid system schematics are on file with the AOGCC. Production Section- · Maximum anticipated BHP: 2,140 psi @ 4,600' TVOss (8.90 ppg EMW). Actual from L-120 MDT's · Maximum surface pressure: 1,680 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: · Planned completion fluid: 3,500 psi (7-%" casing will be tested to 3,500 psi) Estimated 9.2 ppg Brine I 6.8 ppg ~iesel Ullr!li! ~ ~r~'.Il~t..-· Ull~. l(·jU. ~Ií."~.Ji! 5,000 psi Working Pressure 3,500/250 psi Rams & Valves (entire stack and valves 3,500/250 psi Annular Disposal · NO ANNULAR INJECTION ON THIS WELL. .. No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at 05-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to 05-04 for injection. Haul all Class I waste to Pad 3 for disposal. 3 Final Permit 3/4/04 · Grer Prudhoe Bay L-201 ML Permit Formation Markers ~.\.:iî~T ~ !lq........ SV5 1,475 1617 675 8.8 No SV4 1,600 1766 730 8.8 No Base Permafrost 1,680 1866 770 8.8 No SV3 1,960 2245 890 8.7 Poss. Gas Hydr. SV2 2,130 2509 960 8.7 Poss. Gas Hydr. SV1 2,460 3031 1,120 8.8 Poss. Gas Hydr. UG4 2,750 3490 1,255 8.8 Yes - Heavy Oil UG4A 2,785 3546 1,270 8.8 Yes - Heavy Oil UG3 3,150 4123 1,420 8.7 Yes - Heavy Oil UG1 3,500 4672 1,600 8.8 Yes - Heavy Oil Ma 3,960 5379 1,820 8.8 Yes - Heavy Oil Mb1 4,000 5444 1,825 8.8 No - Wtr Mb2 4,080 5578 1,830 8.6 No - Wtr Mc 4,155 5710 1,845 8.5 No - Wtr Na 4,200 5793 Nb 4,230 5850 1,890 8.6 No - Wtr Nc 4,275 5940 OA 4,370 6151 1,970 8.7 Yes OBa 4,440 6226 2,000 8.7 Yes OBb 4,490 6494 2,060 8.8 Yes OBc 4,545 6734 2,110 8.9 Yes OBd 4,600 7051 2,140 8.9 Yes TO (OBd) 4,684 13,632 2,168 8.9 Yes Casing/Tubing Program 48" 20" X 34" 215.5# A53 Welded 80' 29' I 29' 109' 1109' 13-*" 10-%" 45.5# L-80 BTC 3,160' 29' 1 29' 3,189' I 2,639' 9-%" 7-%" 29.7# L-80 BTC-M 7,062' 29' I 29' 7,091' I 4,686' 6-%" OBd 4-*" slotted 12.6# L-80 IBT 6,541' 7,091' 14,686' 13,632' I 4,763' 6_%" OBb 4-%" slotted 12.6# L-80 IBT 5,668' 6,513' I 4,574' 13,536' I 4,657' 6-%" OBa 4-%" slotted 12.6# L-80 IBT 5,668' 6,341' I 4,521' 13,494' I 4,636' 6-%" OA 4-%" slotted 12.6# L-80 IBT 3,729' 6,170' I 4,456' 9,668' 1 4,444' Tubing 4-%" 12.6# L-80 IBT-M 6,121' 29' I 29' 6,150' I 4,454' Cement Calculations Casing Size 110-% -in 45.5-lb/ft L-80 BTC surface casing Basis 250% excess in permafrost. 30% excess below permafrost. Top of tail cement 800' MD above shoe Total Cement Vol: Wash 20-bbl CW Spacer Spacer 70-bb11 0.1-lb/gal MudPush spacer Lead 468-bbl, 613-sx 10.7-lblgal ASL - 4.28 fe/sx (cement to suñace) . Tail 75-bbl, 360-sx 15.8-lb/gal Premium G - 1.17 ft;!/sx ø_."",_._.~~!,~!!..~!.~,8537'!,"'~,~.",,_...ø"'0'O'==0ø..........@.'''__,_@.~._..",,,ø''''"'.__..,...~...__..,_· Temp I BHST == 55°F from SOR, BHCT 60°F estimated by Dowell In the event that cement Is not circulated to suñace during the Initial suñace casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to suñace. 4 Final Permit 3/4/04 · Gr. Prudhoe Bay L-201 ML Permit Casing Size 17-% -in 29.7-lb/ft L-80 BTC-M intermediate casing Basis Top of tail cement 700-ft MD above top of Schrader Ma-sand. 30% excess over gauge. Total Cement Vol: Wash 25-bbl Water Spacer 45-bbI10.3-lb/gal MudPush Spacer Tail 124 bbl, 578-sx 15.8-lb/gal Premium - 1.20 ft;j Isx · Te~p '~~1: ~~0:~1!;~:~~6r ~;:F :;~;~:~ by ~i~ib~rt~~' ,~,."._~-,- 1~" Casing Centralizer Placement a) Run (25) 9-%" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 2,189' MD (1,00' MD above the shoe). b) This centralizer program is subject to change pending actual hole conditions. 7-0/." Casing Space Out a) Space 7-%" casing out with pups and long/short joints as required to place the top of a long full joint - 5- 15' above the top of the OBb, OBa and OA sands to allow for the window to be milled just below the top of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance reservoir contact depending on the angle of intersection of each zone. b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth except on the OBd lateral. It will need to be placed 120' above the casing shoe. c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out. 7-0/." String Centralizer Placement a) Centralizer size: 7-%" X 9-%" (this is different then the norm of ~"under gauge hole) b) Do not run centralizers on the window joints spaced at the top of each sand. c) Place 2 rigid straight blade centralizers back to back at the very bottom of the shoe joint. Do not run any centralizers on the next two full joints. d) With the exception stated above, alternate 1 rigid straight vane cenralizer floating across a full joint and 2 rigid straight vane centralizers, one floating on the upper half of the joint and one floating on the lower half of the joint separated by a stop collar up to ±5,830' MD (320' MD above the top OA sand). Then continue with 1 rigid straight vane centralizer per joint floating to 4,600' MD (780' MD above Ma sand). Zonal isolation with cement is required between the OA and the Nb sands due to the presence of water in the Nb sand. The centralizer program is subject to change pending modeling and hole conditions. 4 'W' Solid Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop collar. Do not put any centralization on the first two joints above the bent joint. Survey and logging Program 13-1A/' Hole Section: Open Hole Drilling: Cased hole: 9-%" Hole Section: Open Hole Drilling: Open Hole: Cased Hole: 6-3A" Hole Section: Open Hole Drilling: Cased Hole: Surface Gyro if needed (have discussion with ODE on photo or E-line Gyro) MWD I GR None Surveys will need to be IFR + MS corrected real time MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only) None USIT Bond Lo onl as contin enc if oor cement job Surveys will need to be IFR + MS corrected real time MWD I GR I Res I Azimuthal Den I Neu (DenlNeu recorded only) I AIM I PWD None 5 Final Permit 3/4/04 · Grer Prudhoe Bay L-201 ML Permit Drillina Hazards and Continaencies POST THIS NOTICE IN THE DOGHOUSE IV. Well Control A. The Schrader in this fault block is expected to be underpressured based on the MDT samples. a. OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's b. OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's c. OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's d. OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's Hydrates and Shallow gas A. Gas hydrates are present below L-pad, but have not been a significant issue thus far during L-Pad drilling. If hydrates are encountered follow the recommended practice and apply good drilling operational practices. III. Lost Circulation/Breathing A. Lost circulation is unlikely within the Schrader interval. B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee. Kick Tolerancellntegrity Testing A. The 10-%" casing will be cemented to surface. B. The 7-%" casing will be cemented with 15.8lb/gal tail cement to 700' MD above the Ma sand -4,680' MD. C. The Kick Tolerance for the surface casing is 52.7 bbls with 9.2 ppg mud, 11.4 ppg LOT, and an 8.9 ppg pore pressure (most likely 8.9 ppg based on recent MDT's within the block). If the LOT is less then 11.4 ppg EMW, then the kick tolerance will be < 50 bbls. D. The Kick Tolerance for the production hole laterals is infinite with 9.2 ppg mud, 12.0 ppg FIT, and an 8.9 ppg pore pressure. If the FIT is less then 12.0 ppg EMW notify the ODE to have conversation on how to deal with potential ECD concerns around the casing exit points. E. Integrity Testing /"i;.J;;.;,~!IQ,' I 10-%-in Window 7 -%-in Shoe 7-% -in Window 7-% -in Window 7-% -in Window II. L V. =!~~" ::::t.. !lib\V;';"_QJIï¡lT-Jii~~~ ~.. 20-ft min new formation below shoe LOT 11.4 minimum 20-ft min new formation below shoe FIT 12.0 minimum 20-ft minimum from top window FIT 12.0 minimum 20-ft minimum from top window FIT 12.0 minimum 20-ft minimum from top window FIT 12.0 minimum Stuck Pipe A. We do not expect stuck pipe. B. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners moving as much as possible and run one centralizer per joint to help with standoff. VI. Hydrogen Sulfide A. L-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. Recently 10 ppm of H2S has been measured at L-Pad from all wells tested as recently as January 2003 with hand held H2S meters. This is as a result of H2S being transmitted by shared gas lift gas and not produced from L-Pad. There has been no seawater injection at L-Pad to date. VII. Faults There are four visible faults to cross while drilling the well. It is possible to encounter sub-seismic faults along the proposed well path. In the production hole sections, if a fault throws us out of section steer up as fast as possible to determine where we are within the section. This will make it easy to lowside OH sidetrack to get back on course. Fault #1 : Fault #2 SV6 UG1 1,090' MD 5,190' MD 1,000' TVDss 3,840' TVDss 80' West throw 40' Southwest throw CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 Final Permit 3/4/04 · Gr.r Prudhoe Bay L-201 ML Permit Drill and Complete Procedure Summary Pre-Ril! Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. DrillinQ RiQ Operations: 1. MIRU Nabors 9ES Nipple up diverter spool and riser. Function test diverter. PU 4,200' of 5" DP as required and stand back in derrick (this will enable both holes to be drilled without changing the DP handling equipment in open hole). 2. MU 13-*" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,189' MD 12,639' TVD. The actual surface hole TD will be +1-100' TVD below the top of the SV1 sand. 3. Run and cement the 10-%", 45.5# L-80 surface casing back to surface. Will use TAM collar as contingency only. ND drilling spool and riser and NU casing I tubing head. NU BOPE and test to 3,500 psi. 4. MU 9-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at ±800' from the bit in the HWDP section and RIH PU 4" DP to float collar. Test the 10-%" casing to 3,500 psi for 30 minutes. 5. Drill out shoe track. Circulate and condition mud. Displace well to new LSND drilling fluid. Drill 20' of new formation below rathole and perform a LOT. Directionally drill ahead to TD (Topset the OBd) as per directional profile to 7,091' MD I 4,686' TVD. 6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TO. Make sure hole is clean prior to POOH. POOH laying down the 5" DP and standing back the 4" DP, LD drilling BHA. Retrieve bowl protector. 7. MU and run 7_%" 29.7# L-80 BTC-M long string casing to TD. Cement in one stage to 700' MD above the Schrader Ma sand. Bump plug with seawater. Land casing on mandrel hanger. 8. Clean pits for displacement. Freeze protect 7_%" x 10-%" annulus with dead crude to 2,200' TVD. 9. PU 6_%" Powerdrive RSS or conventional assembly with MWD/GR/Resl Azimuthal Den /Neu/PWD and RIH to the float collar picking up 4" DP on the way. Test the 7-%" casing to 3,500 psi for 30 minutes. 10. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation below rathole and perform an FIT to 12.0 ppg EMW. Directionally drill ahead to TD geosteering through the OBd to TD at 13,632' MD I 4,763' TVD (prognosed). Perform wiper trip, circulate and condition mud. 11. POOH to near OBb window depth, log into top OBb and OBb RA marker with GR, log across the OBa and OA windows as well. POH LD drilling assembly. 12. MU and run 4_*" 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TO. Position liner top packer 100' below OBb window. 13. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is near the top of the OBb sand (planned window exit: 6,501' MD). Orient whipstock to highside. Shear off Whipstock & mill window. Perform FIT to 12 ppg EMW. POOH 14. RIH with 6_%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock. Directionally drill to 6_%" TO. Planned TO is 13,536' MD. Circulate and condition mud and perform wiper trip. POOH. 15. Pull whipstock #1. Run and set 4_*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, circulate and condition mud, POOH 16. PU the 7_%" whipstock assembly. Set the whipsock on the OBb liner top packer such that the top of the window is near the top of the OBa sand (planned window exit: 6,329' MD). Orient whipstock to highside. Shear off of Whipstock and mill window. Perform FIT to 12 ppg EMW. POOH 17. RIH with 6_%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock. Directionally drill to 6_%" TD. Planned TD is 13,494' MD. Circulate and condition mud and perform wiper trip. POOH. 18. Pull whipstock #2. Run 4_*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 19. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is near the top of the OA sand (planned window exit: 6,158' MD). Orient whipstock to highside. Shear off of Whipstock and mill window. Perform FIT to 12 ppg EMW. POOH 20. RIH with 6_%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock. Directionally drill tQ 6~%" Tp. Planned TD is 9,668' MD. Circulate and condition mud and perform wiper trip. POOH. .1. Pull whipstock #t.~R~~~2" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral ~ntry Module #2 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL2brine. POOH. 7 Final Permit 3/4/04 · Gr.r Prudhoe Bay L-201 ML Permit 22. MU 4-W' 12.6# BTM-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus. 23. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK-1 valve. ~4. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 25. Pull two-way check. Freeze protect the well to 2,200' TVD. Install VR plug in 7-%" casing annulus valves. 26. Install BPV. Secure the well and rig down I move off Nabors-9ES. 8 Final Permit 3/4/04 POST RIG - COMPLETI TREE: FMC 4-1/16- 5M L-201, L 1, L2, & L3 WELLHEAD: FMC Gen 5 System 11", 5M csg.head wI?" mandrel hanger & packoff 11)Ii; ~ ~: ~ ~~~~f:i~:fo~~I:~~:h control line ports ~~ 20' X 34' 215.51bfft. A53 ERW Inw~ted I 109' . ~~~::: :~;:::::~:,~D) 12,200' TVDI . I Orig KB elev (N-9ES) = 28.5' I ... .- Junction SDecifications: Junction 10 through LEM Module without diverter: 3.65- ....10-314", 45.5# L-80 BTC Csg @ 3,19T MD Phoenix Pressure Gauge with control lines to surface -5/8" X 5-1/2" Baker PRM Packer 4-1/2", 12.6 Iblft, L-80, BTC-M Coupling 00: 5.2" OriftllO: 3.833"/3.958" _4.5" Baker sliding sleeve with 3.813"ID 4.5- WLEG I 6,128' MD I 9.2 PPG Versapro MOBM below Completion 6-314"OALateral 16,158'-9,668' I 7-5/8",29.7#, L-80, BTC-M Casing Orift: 6.75" Casing 10: 6.875" 6-314" OBa Lateral 16,329'-13,494'1 -... -- -_:.: -- ~=~-,;,.~ ,;,.--..:~- ~~ ..;.-~ Baker Hughes Hookwall Hanger @ 6,148' MD Window in 7-5/8" casing@ 6,158' MD Well Inclination @ Window = 660 Baker Hughes Hookwall Hanger @ 6,319' MD Window in 7-5/8" casing@ 6,329' MD Well Inclination @ Window = 700 Baker Hughes Hookwall Hanger @ 6,491' MD Window in 7-5/8" casing@ 6,501' MD Well Inclination @ Window = 740 6-314" OBb Lateral 16,501'-13,536'1 ._~-~~ :~~~.:...;! 7-5/8" Casing Shoe @ 7,091' MD " 6-314" OBd Lateral 17,091'-13,6321 DATE REV. BY COMMENTS G~t'.ibW~6v API NO: 50-o29-xxxxx-oO ORION SO-o29-xxxxx-60 WELL' L 201 ML 50-o29-xxxxx-61 . - SO-Q29-xxxxx-62 3/412004 MIK TRIOLO Level 3 Multi-lateral. 4-1/2" GL Completion I i/ J /:.... .. / /~ ,/"" I -11IIII- I . PLANT ) 15'00'00' GRID L-111i. L-114. L-SD . L-121 . L-110. L-SI . L-116 . L-109 . L-SL . L-01 . L-107 . L-108i. L-105i. L-106. L-104 . s-w . L-102 . ~ ~I 1X'¡¡09.~ . L~~4..." 6~~ P:~~~~ '. ,'" T12N AREA T11N w a:: L-PAD 2 . N-L (NWE-1) 4 · N-A (NWE-2) · L-113 · L-112i · L-02 · L-122 c:~.'.".... ;~, ,/ '. , . c__ VICINITY MAP N.T.S. LEGEND -+- AS-BUILT CONDUCTOR . EXISTING CONDUCTOR · L-115i · L-117 · L-118 I~ · L-103i L- 201 t L-119i L-21Oi L-120 ~~\~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE Of ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF DECEMBER 18, 2003. ~ NOTES 1. DATE OF SURVEY: DECEMBER 18. 2003. 2. REFERENCE FIELD BOOK: W003-14 PAGES 37-38. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. BASIS Of HORIZONTAL LOCATION IS L-PAD OPERATOR MONUMENTA1l0N, 5. BASIS Of ELEVATION IS L-PAD OPERATOR MONUMENTS. ELEVATIONS ARE BP MSL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS L-201 y= 5,978,320.84 N= 10,000.09 70'21'02.654" 70.3507372' 502' 2,598' FSL X= 583,325.34 E= 5.340.15 -14919'24.511" -149.3234753' . 3,588' FEL y= 5,978,328.65 N= 10,000.14 70'21'02.727" 70.3507575' 50.8' 2,605' FSL L-21Oi x= 583,354.28 E= 5,370.13 -149'19'23.663" -149.3232397' 3,559' FEL o 12/19./03 ISSUED F'OR INFORMAl1ON NO. OA'W; RE'IIS1ON )llJ~' DRAWl\!: ObP JACOBS CHECKED: O'HANLEY DATE; 12/19/03 DRA~NG: GPB WOA L-PAD SHEET: FRB03 WOL 02-00 il8)~~mœo JOB NO; SCALE: AS-BUILT CONDUCTORS ~MOLMIOSUhI['f131t5 1 OF 1 JJ LON _ tIDT F1MWŒD I,MI[ I·. 130' WELLS L-201 & L-210i BY Oil( - --... ",., L-201 L 1 (P3) Proposal Schlumberger Report Date: Janual)' 9, 2004 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 130,000' Field: Prudhoe Bay Unit - WDA ~04 Vertical Section Origin: N 0.000 ft, E 0,000 ft Structure I Slot: L-PAD / Plan L-201 (N-U) 03/0" TVD Reference Datum: RotaI)' Table Well: Plan L-201 (N-U) APpro TVD Reference Elevation: 78.70 ft relative to MSL Borehole: Plan L-201 L1 DBb Sea Bed / Ground Level Elevation: 50,20 ft relative to MSL UWl/API#: 50029 Magnetic Declination: 25.027' Survey Namel Date: L-201L 1 (P3) DBb / Janual)' 9, 2004 Total Field Strength: 57559.384 nT Tort/ AHDI 001 / ERD ratio: 220.867'/11160,81 ft/6.855/2.397 Magnetic Dip: 80,822' . Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: 20-Mar-04 Location Lat/long: N 70.35073717, W 149,32347531 Magnetic Declination Model: BGGM 2003 Location Grid NIE YIX: N 5978320,840 ftUS, E 583325.340 ftUS North Reference: True North Grid Convergence Angle: +0.63713312' Total Corr Mag North -> True North: +25.027' Grid Scale Factor. 0.99990789 Local Coordinates Referenced To: Well Head I Comment. Measured I Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Tool Face I Northing Easting Latitude Longitude Depth Section Departure (ft) (dog ) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (degJI00ft) (dog/100ft) (degJI00ft) (dog ) (ftUS) (ftUS) Top Whipstock 6501,00 73,87 115,15 4570,56 4491,86 50,14 4130,04 2669,77 2305.66 4,00 2,50 3,25 23,OOG 5981015,83 585600,96 N 70.35802977 W 149,30475105 Base Whipstock 6513,00 75,64 115,92 4573.71 4495,01 61,35 4141,62 2664,78 2316,11 16,00 14,74 6.45 O,OOG 5981010,96 585611.46 N 70.35801613 W 149,30466623 KOP Cry 10/100 6526.00 75.64 115,92 4576,94 4498,24 73.57 4154,21 2659,28 2327.43 0,00 0,00 0,00 12,71G 5981005,58 585622.84 N 70,35800108 W 149,30457427 6600,00 82,86 117,56 4590.73 4512.03 144.28 4226,86 2626,58 2392.31 10,00 9,76 2,21 12,41G 5980973,61 585688.07 N 70,35791169 W 149,30404750 90' PI 6673,05 90,00 119,12 4595,28 4516,58 215,64 4299.72 2591.99 2456.43 10,00 9.77 2.14 12,31G 5980939.74 585752,57 N 70.35781713 W 149.30352685 6700,00 92.63 119.70 4594,66 4515.96 242,12 4326,66 2578,76 2479,90 10,00 9,77 2.13 12,32G 5980926,77 585776.18 N 70.35778097 W 149,30333631 End Cry 6708,62 93.47 119,88 4594.20 4515.50 250.59 4335,27 2574.48 2487,37 10,00 9,77 2,14 O,OOG 5980922,57 585783,70 N 70,35776927 W 149,30327565 Cry 6/100 6869.08 93.47 119,88 4584.49 4505,79 408,27 4495.44 2494,68 2626.24 0,00 0,00 0,00 -162,16G 5980844,33 585923.43 N 70.35755114 W 149,30214814 6900,00 91,71 119,32 4583.09 4504.39 438.65 4526.32 2479.42 2653,10 6,00 -5,71 -1.84 -162,19G 5980829,38 585950.45 N 70,35750943 W 149.30193008 L-201L 1 Tgt 2 OBb 6919,36 90,60 118,96 4582,70 4504,00 457,65 4545.68 2470.00 2670.00 6,00 -5,71 -1,84 -159.71G 5980820,14 585967.46 N 70.35748368 W 149,30179284 End Cry 6920,59 90,53 118.93 4582.69 4503.99 458.86 4546.91 2469.40 2671,08 6,00 -5,63 -2,08 O,OOG 5980819,56 585968,54 N 70,35748205 W 149,30178409 Cry 6/100 8537.19 90,53 118.93 4567,72 4489,02 2045.34 6163,44 1687.31 4085,83 0,00 0.00 0,00 -84,06G 5980053,32 587391.77 N 70,35534371 W 149,29029872 8600,00 90,92 115,19 4566,92 4488,22 2106,54 6226,25 1658,75 4141,74 6,00 0,62 -5,97 -84.11G 5980025.38 587448,00 N 70,35526558 W 149,28984478 . L-201L 1 Tgt 3 OBb 8613,16 91,00 114.40 4566.70 4488,00 2119.24 6239.40 1653,23 4153,69 6,00 0,62 -5,97 -84,03G 5980020,00 587460.00 N 70,35525049 W 149.28974782 8700,00 91,54 109,22 4564,78 4486,08 2201,69 6326,22 1620,99 4234.27 6,00 0,62 -5.97 -84.14G 5979988,65 587540,92 N 70,35516228 W 149,28909368 End Cry 8793.65 92,10 103,62 4561,80 4483,10 2287.44 6419,82 1594,54 4324,02 6,00 0,60 -5,97 O,OOG 5979963,21 587630,95 N 70.35508989 W 149,28836505 Cry 6/100 9085.04 92,10 103,62 4551,11 4472.41 2548,32 6711,02 1525,95 4607,02 0,00 0,00 0.00 105.42G 5979897,78 587914,68 N 70.35490206 W 149,28606745 9100,00 91,86 104.49 4550,59 4471,89 2561,76 6725,97 1522,32 4621,52 6,00 -1,60 5,79 105.45G 5979894,31 587929,21 N 70,35489212 W 149,28594973 9200,00 90,26 11 0,27 4548,74 4470,04 2654,01 6825,95 1492.47 4716,90 6,00 -1,61 5,78 105,56G 5979865.53 588024,91 N 70.35481040 W 149,28517547 L-201 L 1 Tgt 4 OBb 9216,08 90,00 111,20 4548,70 4470,00 2669,18 6842,35 1486,78 4731,93 6,00 -1.61 5,78 105,10G 5979860,00 588040,00 N 70.35479483 W 149.28505343 9300.00 88.69 116,06 4549.66 4470.96 2749.68 6926,27 1453,15 4808,79 6,00 -1,56 5,79 105.04G 5979827,23 588117.22 N 70,35470283 W 149,28442954 End Cry 9335.71 88.14 118,13 4550,65 4471,95 2784.47 6961,97 1436.89 4840,56 6,00 -1,55 5,80 O.OOG 5979811,33 588149,17 N 70,35465835 W 149.28417161 Cry 6/100 10079.11 88,14 118,13 4574,84 4496,14 3511.60 7704,97 1086.55 5495.79 0.00 0,00 0,00 87.46G 5979468,33 588808,19 N 70,35370002 W 149.27885350 10100,00 88,19 119,39 4575.51 4496.81 3532,07 7725,85 1076,51 5514,09 6,00 0,27 6,00 87.42G 5979458,49 588826.60 N 70.35367254 W 149,27870496 10200,00 88.47 125,38 4578.43 4499.73 3631,10 7825,81 1023,00 5598.47 6,00 0,28 6,00 87,25G 5979405,92 588911,56 N 70,35352618 W 149.27802023 L-201 L 1 Tgt 5 OBb 10210,31 88,50 126,00 4578,70 4500,00 3641,39 7836,12 1016,98 5606,84 6,00 0.29 6,00 87.31G 5979400,00 588920,00 N 70,35350973 W 149.27795228 10300.00 88.76 131,38 4580,85 4502,15 3730.99 7925,78 960.96 5676,80 6,00 0,29 5,99 87,18G 5979344,77 588990,57 N 70.35335653 W 149,27738461 End Cry 10345.21 88,89 134,09 4581,77 4503.07 3776,14 7970,98 930,29 5710,00 6,00 0,30 5.99 O,OOG 5979314.47 589024,10 N 70,35327268 W 149,27711525 Cry 6/100 11423,93 88,89 134,09 4602.61 4523,91 4851,92 9049,5 179,91 6484,69 0,00 0.00 0.00 141.49G 5978572.83 589807,02 N 70,35122101 W 149.27083072 Well Design Ver 3,1RT-SP3,03-HF2,03 Bld( d031rt-546) Plan L-201 (N-U)IPlan L-201 (N-U)IPlan L-201 L 1 OBb1L-201 L 1 (P3) OBb Generated 3/4/2004 8:55 AM Page 1 of 2 I Comments Mea.ured I Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I Along HOle, NS Depth Section Depar1ure (II) (dog ) (deg) (II) (II) (II) (II) (II) L-201 L 1 Tgt 6 OBb 11428,05 88,70 134.24 4602,70 4524,00 4856.02 9053,61 177,05 End CrY 11431,96 88,51 134.38 4602,80 4524,10 4859,91 9057,52 174,32 CrY 6/100 12356.43 88,51 134,38 4626,81 4548,11 5781,38 9981,69 -472,05 12400,00 88,52 131,76 4627.94 4549,24 5824.87 10025.24 -501,79 L-201 L 1 Tgt 7 OBb 12429,40 88.52 130,00 4628,70 4550,00 5854,25 10054,63 -521,03 12500.00 88,52 125,76 4630,52 4551,82 5924,76 10125,21 -564,35 12600.00 88,54 119,76 4633.08 4554,38 6023,89 10225,17 -618.43 End CrY 12636,92 88,55 117,55 4634,02 4555,32 6060,07 10262,08 -636.12 TD / 4-1/2" Lnr 13536,26 88.55 117,55 4656,70 4578,00 6937,97 11161.14 -1051,89 Leqal Description: Surface: 2597 FSL 3588 FEL 534 T12N R11 E UM L-201L 1 Tgt 2 OBb: 5067 FSL 914 FEL S34 T12N R11E UM L-201L 1 Tgt 3 OBb: 4250 FSL 4712 FEL S35 T12N R11E UM L-201L1 Tgt4 OBb: 4083 FSL 4134 FEL S35 T12N R11E UM L-201L 1 Tgt 5 OBb: 3612 FSL 3260 FEL 535 T12N R11E UM L-201L1 Tgt 6 OBb: 2771 FSL 2381 FEL 535 T12N R11E UM L-201 L 1 Tgt 7 OBb: 2073 FSL 1664 FEL S35 T12N R11 E UM TO / BHL: 1541 FSL 696 FEL S35 T12N R11E UM Northln!! (Y) [flUS] 5978320,84 5980820,14 5980020,00 5979860,00 5979400,00 5978570.00 5977880.00 5977360.00 Well Design Ver 3,1RT-SP3.03-HF2,03 Bld( d031rt-546) Eastlnq IX) [ftUS] 583325,34 585967.46 587460.00 588040.00 588920,00 589810.00 590535,00 591510,00 EW I DLS 'Build Rate Walk Rata I (II) (degl1001l) (dog/1001l) (dog/1001l) 6487.64 6,00 -4.69 3,74 6490.44 7150,95 7182.77 7204,99 7260.68 7344.71 7377,09 8174,24 Tool Face I (dog ) 143.44G Enting (IIUS) 589810,00 latitude Longitude Northing (IIUS) 5978570.00 N 70,35121318 W 149,27080680 6,00 -4,82 3,57 O,OOG 5978567,30 589812,83 N 70.35120571 W 149,27078411 0,00 0,00 0,00 -89.95G 5977928,37 590480.43 N 70,34943825 W 149.26542686 6,00 0,01 -6.00 -89,88G 5977898,99 590512.57 N 70,34935692 W 149,26516884 6,00 0,02 -6,00 -9D.OOG 5977880,00 590535.00 N 70,34930430 W 149.26498860 6,00 0,01 -6.00 -89,89G 5977837.30 590591.16 N 70,34918580 W 149,26453688 6,00 0.02 -6.00 -89,74G 5977784.17 590675,78 N 70,34903786 W 149,26385523 6,00 0.03 -6,00 O,OOG 5977766,84 590708,35 N 70.34898943 W 149,26359250 0.00 0,00 0,00 O.OOG 5977360,00 591510.00 N 70,34785133 W 149.25712540 . . Plan L-201 (N-U)IPlan L-201 (N-U)IPlan L-201L 1 OBbIL-201L 1 (P3) OBb Generated 3/4/2004 8:55 AM Page 2 of 2 ~ 0 0 "A g 4800 ..... II ( ) ëij ü C/) 0 ~ 5600 Schlumberger WELL FIELD Prudhoe Bay Unit - WOA STRUCTURE L- PAD L-201 L 1 (P3) Magnetic Parameters Model: BGGM2003 Surfaoelocatlon La!.: N70Z12.654 Lon: W'491924.511 NAD27 Alaska Slate Planes, Zone 04, US Feel. Northing: ~78320.84ftUS GrldConv: +0.63713312' EastIog; 583325.34 ftUS Scale Fact: 0.9999078872 Míscetlaneous Slot PlanL·201 (N.U Plan: L-201L1 (P3)08b Dip: 80.622' MagOe<::: +25.035' Date: Marcn13,2004 FS: 57558.8nT TVD Ref: Rotary Table (78.70 1\ above MSl) Srvy Dille: January 09, 2004 o 800 1600 2400 3200 4000 4800 5600 6400 . · . . . , , . . · . . . . , . . "....:.,.....,..........",.....,....."...:..,...."......................,.".~,.................."...............:..................................".:..........,..........................:....,.................................:.................................,....:.............·....···..·....········.:.....······....··....····..··..,..40·00 -(-op Whipstock ~ ! ¡ ~ ¡ ¡ ~ f 1: B..:;h~~t~~/~OO ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ 90' PI End Cry C!" 6/100 ¡ End Cry ¡ L·201 L1 Tgt 4 CBb ¡ ¡ ¡ ¡ ¡ :_' ~~:¡~~:~;:~~:t?:~;~\~I::~1f~;~:r;;~\:l';;:¡~~:::':;~i~;:;~:::~;f;:\\::/;;~¡;;';~: 4000 · . ,............"...............................................".......... · . · . · . · . · . · . o 800 1600 2400 3200 4000 4800 Vertical Section (ft) Azim = 130·, Scale = 1 (in):800(ft) Origin = 0 N/-S, 0 EI-W 5600 6400 560. 1600 ^ ^ ^ z g 0 0 ~ g 800 ... II ( ,) ë5 <.> rJ) rJ) v v v 0 Schlumberger WELL FJELD STRUC1\JRE L-P AD L-201 L 1 (P3) Prudhoe Bay Unit - WOA Magnetic Parameters Model; BGGM 2003 SulfaceLocation La!.: N70212.6M Lon; W1491924.S11 NAD21 Alaska State Planes, Zone 1M, US Feet Northing: 5978320.8AftUS GridConv: +0.63713312· Eaating: 583325.34 /IUS Scale Fact: 0.9999078872 TVD Ref: Rotary Tabkt (78.10 It above MSL) SrvyDale: January08,2004 MlscellaOOOUll Slot: PlanL-201 (N-U) Plan: L_201L1 (P3) OBb Dip: 80.822" MagDec: +25,035' Dale: March 13,2004 FS: 57558.8nT 2400 4000 5600 8000 6400 7200 3200 4800 2400 2400 . Crv 6/100 ; L·201L1 Tg~2 OBb _~ N . . . , . . ~ ,,:4~~~..'mm'rl-I--I-~ "...........~,,,...,,....,,.....,,,........,,....~.......,.......,.............'. Crv 6/100 L·201L 1 Tg14 OBb . . . End Cl . m:+mll_' ON .". . , ¡ ! , L·201L1Tg160Bb II:::::...·"'·'......···..........··..'....·;:::,::::: -·--!::::::::·····'·..·..·......"..··..···'·..'..!:.i::::::.................................. ..··........····..·..r····~~'~:~~2~~~1·T~·~·~J·......·..·..··.. ,~ ~······l·m r-r--¡mr-¡r--r 1600 800 . o -800 -800 2400 3200 4000 4800 5600 <<< W Scale = 1(in):800(ft) E >>> 6400 7200 8000 . BPX AK Anticollision Report . NO GLOBAL SCAN: Using user defined setection & scan criteria Interpolation Method: MD Intervat: 50.00 ft Depth Range: 6501.00 to 13536.26 ft Maximum Radius: 10000.00 ft Reference: Error Model: Scan Method: Error Surface: Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Survey Program for Definitive Wetlpath Date: 12/22/2003 Validated: No ptanned From To Survey ft ft 28.50 6501.00 Planned: Plan #5 V1 (0) 6501.00 13536.26 Planned: Plan #3 V1 Version: 2 Toolcode Tool Name MWD+IFR+MS MWD+IFR+MS MWD + IFR + Multi Station MWD + IFR + Multi Station Casing Points 3189.31 6593.00 14113.12 2638.70 4589.82 0.00 10.750 7.625 4.500 13.570 9.875 6.750 103/4" 7-5/8" 41/2" Summary EX NWE#1 NWE1-01A NWE1-01A V4 Out of range EX NWE#1 NWE1-01 NWE1-01 V3 Out of range PB L Pad L-01 L-01 V14 7092.35 4900.00 4123.22 84.54 4038.68 Pass: Major Risk PB L Pad L-01 L-01 L 1 V2 Plan: Plan # 7092.35 4900,00 4123.22 84.55 4038,67 Pass: Major Risk PB L Pad L-02 L-02 V1 Out of range PB L Pad L-02 L-02PB1 V21 Out of range PB L Pad L-102 L-102 V2 11005.37 8100.00 762.89 167.89 595.00 Pass: Major Risk PB L Pad L-102 L-102PB1 V10 7527.37 3464.00 3244.61 84.85 3159.75 Pass: Major Risk PB L Pad L-102 L-102PB2 V2 7463.40 3464.00 3205.95 81.69 3124.26 Pass: Major Risk PB L Pad L-103 L-103 V23 8573.64 6750,00 873.47 137.62 735.85 Pass: Major Risk PB L Pad L-104 L-104 V7 11873.89 8650,00 1703.90 209.44 1494.46 Pass: Major Risk PB L Pad L-105 L-105 V4 8600.00 6300.00 2607.50 141.54 2465.96 Pass: Major Risk PB L Pad L-106 L-106 V14 7097.21 5350.00 2778.44 85.25 2693.18 Pass: Major Risk PB L Pad L-107 L-107 V14 7881.92 4200.00 4294.22 109.10 4185.12 Pass: Major Risk PB L Pad L-108 L-108 V18 6869.08 3700.00 4297.43 74,34 4223.09 Pass: Major Risk PB L Pad L-109 L-109 V12 6834,86 4750.00 5260.81 78.09 5182.72 Pass: Major Risk PB L Pad L-110 L-110V11 6556,75 7850.00 8261,39 78.12 8183.28 Pass: Major Risk PB L Pad L-111 L-111 V24 Out of range PB L Pad L-112 L-112V8 Out of range PB L Pad L-114 L-114 V14 Out of range PB L Pad L-115 L-115 V7 Out of range PB L Pad L-116 L-116 V10 Out of range PB L Pad L-117 L-117V11 Out of range PB L Pad L-118 L-118V9 Out of range PB L Pad L-119 L-119V9 6504.56 6400.00 319.69 78.71 240.99 Pass: Major Risk PB L Pad L-120 L-120 V8 8349.73 6650.00 375.44 112.80 262.64 Pass: Major Risk PB L Pad L-121 L-121 V14 Out of range PB L Pad L-121 L-121A V1 6869.08 6350.00 7768.49 107.85 7660.64 Pass: Major Risk PB L Pad L-122 L-122 V5 Out of range PB L Pad L-210 L-210PB1 V7 10005,68 7450.00 843.75 113.25 730,50 Pass: Major Risk PB L Pad L-210 Plan L-210 V3 Plan: PI 10402.13 7900.00 556.67 133.05 423.62 Pass: Major Risk PB L Pad Plan L-113 (N-B) Plan L-113 V5 Plan: PI Out of range PB L Pad Plan L-123 (N-R) Plan L-123 V1 Plan: PI 8203.52 6950.00 230.77 121.04 109.73 Pass: Major Risk PB L Pad Plan L-124 (N-C) Plan L-124 PB1 V1 Plan Out of range PB L Pad Plan L-124 (N-C) Plan L-124 V1 Plan: PI Out of range PB L Pad Plan L-200 (N-M) Plan L-200 OBd V1 Plan Out of range PB L Pad Plan L-200 (N-M) Plan L-200L1 OBa V3 PI Out of range PB L Pad Plan L-200 (N-M) Plan L-200L2 OA V2 Pia Out of range PB L Pad Plan L-201 (N-U) Plan L-201 OBd V1 Plan 6501.00 6500.00 1.00 79.92 -78.92 FAIL: Major Risk PB L Pad Plan L-211 (N-H) Plan L-211 V1 Plan: PI Out of range --294 ·······200 ···100 -0 \00 -·200 -294 Field: Site: Well: Wellpath: Pr... ..oe Bay PB L Pad Plan L-201 (N-U) Plan L-201Ll OBb o 271 270 \80 194 Travelling Cylinder Azimuth (TFO+AZI) [degJ vs Centre to Centre Separation (100ft/in] . 90 . e e PERMIT TO DRILL 20 MC 25.005 (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary wellbore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent well branch, the application for a Permit to Drill need only include information under (c) of this section that is unique to that branch and need not include the $100 fee. . . TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME "P'6' C1 ¿- 20/ t.. / PTD# 20t( - 0t¡ 7 X Development Service CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL x (If API num ber last two (2) digits are between 60-69) Exploration Stratigraphic ~'CLUEn Tbe permit is for a new welJbore segment of existing wen P!'~ L- 2...0 / Permit No, 2ð'f-ðl¡~I No. 50 -02..,~.z 3~ ~ Production should continue to be reported as a function' of tbe original API number. stated above. HOLE In accordance witb 20 AAC 25.005(1), all records, data and logs acquired for tbe pilot bole must be dearly differentiated in both name (name on permit plus PH) and API Dumber (SO 70/80) from records, data and logs acquired for welJ (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE The permit is approved subject ·to fuD compliance with 20 AAC 25.055. Approval to peñorate and produce is contingent upon issuance of a conservation order approving a spacing exception. _ (Companv Name) assumes tbeliability of any protest to the spacinge:Jception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater ·tban 30' sample intervals from below tbe permafrost or from where samples are first caught and 10' sample h:itervals through target zones. . . ~ D Well bore seg Annular Disposal ield & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN ORIN L-201L1 Program DEV PTD#: 2040470 LORATION (ALASKA) INC Initial ClassfType DEV 11-01L GeoArea 890 Unit 11650 On/Off Shore On Administration Permit fee attache~. . - - - - - - · . .Yes - - - - - - - - - - - - 2 Lease.numberapprORriate . . . . . - - - - - - - - - - - - · . .Yes - - - - - - - - - - - - - 3 .U.nique well.narne.and oumb.er . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Y.es - - - - - - - - - - - ~ - - - - - - - - - - ¥ - - 4 WelUQcated ina d.efine~pool. . . . - - - - - - - - · . .Yes - - - - - - - - - - - - 5 WellJQcated proper distance. from driJIing unitbound.a()'. . · . .Yes - - - - - - - - - - - - - - - - - - - - - - 6 Well located proper .distance from otber wells. . . . . . . . . . .Yes 7 S.uffjcientacreageayailable in.drilJiog unjt . . . . . . . - - - - - - - - - - - - · . .Yes - - - - - - - - - - - - 8 If.devi<lted, js weJlbore pl<lUncJu.ded . - - - - - - · . .Yes - - - - - - - - - -- 9 Operator only affected party. . . . . . . . . . - - - - - - - - - - - - - - · . .Yes - - - - - - - - - - - 10 .Operator bas.appropriate.b.onQ in.force . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes - - - - - - - - - . - - - - - - - - - - - - - - - 11 Permit can Þe issued wjtbout conserva.tion order. . . - - - - - - . . . .Yes - - - - - - - - - - - Appr Date 12 PelJ1Jit can Þe issued wjtbout administratille.approval . - - - - - - · . .Yes - - - - - - - RPC 3/8/2004 13 Can permit be approved before 15-day wait Yes 14 Well located within area <lndstrata .authorized by.lnjectioo Order # (PuUO# in. comments).(FQr.NA - - - - - - 15 A!lwells.witÞiJ1.1l4.mile.are.a.ofreyiewideotified(Forservjc.ew.ellonly)............... NA - - - - - - - - - - ~ - - - - - - - - - - - - - - 16 Pre-produçect injector; ~uratiQnof pre-pro~uction l.ess than.:3 months. (For.service wel! Qn]y) . NA - - - - - - - - - - - - - - - - - - 17 .AÇMP.Fïndjng .of Con.sistency.h.as Þee.n.issued. for.tbis proiect . . . .. .NA - - - - - - - - - - - - Engineering 18 Condu.ctor string. provided . . . . . - - - - - - - - - - - - - - .NA - - - - ~ - - - - ~ - - - - ~ - 19 .S.urfac.ecasing.prQtects aILkJ1own. USDWs . . . . . . - - - - - - - NA 20 .CMT. vol. ad~Quate. to circ~I.ate. on .cond.uctpr & su.rf csg . . .. NA - - - - - - - - - - - - 21 .CMT. vol. adeQuate.to tie-in Jong string to.surf csg. . . NA - - - - -- 22 CMT.wil! coverall kno.wnpro.ductíye borí;!:on.s. . . . - - - - - - - - · . No. . . . . . Slotte.d, . . . . . . . . . . . 23 C.asing designs adeQua.te for C,.T. B&.permafrost . . . . . . . . . . · . .Y.es - - - - - - - - - - - - - - - - - - 24 .A~equate .tan.kage. or re.serye pit . . . . . - - - - - - - - - - - - - · . .Yes i'labors.9ES, . . 25 If.a. re-drilt has. a to-4Ø3 fQr abandQnment beeD approved . . . .NA · . Quad!ateral. . 26 A~equate.we boresepªratjo.n.propose~. . . . . _ . . . . . . . . . . . . . . . . .Y.es - - - - - - - - - - - - - - - - - - - - - - - -- 27 If.diverter Jequired, does it .meet regulations. . . . . . . - - - - - - - NA · . Sidet(ack. Appr Date 28 .Drilling fJujd program sch~matic& equip listadequate. - - - - - .Yes · . Max MW.9,2 ppg. . . WGA 3/8/2004 29 BOPEs,.d.othey.meetregulation . - - - - - - - - · . Xes - - - - - - - - - - - - - - - - 30 .BOPEpress ratiDg app(opriate;test lo.(pu.t psig in.comments). . .Yes · . Test l035QO psi. . MSF' 1680 psi. 31 .Chokemanjfold cQmplies w/APIRF'-5:3 (May 64). . . . . . . . · . .Y.es - - - - - - 32 Work will occ.u( without.operation .sbutdown. . . . . - - - - - - - · . Xes - - - - - - 33 Is presence Qf H2S gas. probaÞle. . . - - - - - - · . No. 34 MeçbanicaLcond.ition of wells within .Þ.Oß yerified (fprservi~ welJ only) .NA Geology 35 PelJ1Jil can Þe issued wlo. hydrogen. sul.fide meas.u(es . Yes 36 .D.atapresentect on. pote.ntial oveJpres.sur.e .ZOnes. . . . . . · . .NA Appr Date 37 Seismican<llys.is Qf sballow gas zones. . .. NA RPC 3/8/2004 38 Se<lbedcondjtioD survey (if off-shore) . . . . . . . . . . .NA 39 . CQnta.ct l1amelpÞol1eJor.weekly progress.reports [explorato()' .. .NA Geologic Date: Engineering Date DPß0 Commissioner: Commissioner b\s ~)~+