Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-048 e e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q Lt- - 0 If is Well History File Identifier Production Scanning Stage 1 Page Count from Scanned File: 8" Lf- (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES Date: ro /1 ( ð fo Organizing (done) ~o-sided 11111111I1111111111 RESCAN DIGITAL DATA ~skettes, No. \ D Other, NolType: D Color Items: D Greyscale Items: D Poor Quality Originals: D Other: NOTES: BY: ~ Date &11100 Date 01 q /0 fa c2. x 30 = & D Date & /q / 0 b Project Proofing BY: ~ Scanning Preparation BY: ~ BY: ~ Stage 1 If NO in stage 1, page(s) discrepancies were found: BY: Maria Date: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: Comments about this file: D Rescan Needed 1/111111111" 111111 OVERSIZED (Scannable) D Maps: D Other Items Scannable by a large Scanner OVERSIZED (Non-Scannable) D logs of various kinds: D Other:: 151 VV\f 11I111/111I111 "III ý\l\f + ;;l3 = TOTAL PAGES <6 ð (Count does not include cover sheet) YV\J{) 151 Ir- 151 11111111111I11 "III 151 NO V\1f YES NO 151 11I11111111I11 "III '" 11111111111 "III 151 Quality Checked 111111111111111111I 10/6/2005 Well History File Cover Page.doc • F _~ ~~-_-~ MICROFILMED 03/01 /2008 DO NOT PLACE ~'y',.. .$ °,; ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs_Inserts\Miicrofilm Marker.doc ~\/ED 11/08/06 Sc..rgep NOV 1 3 2006 NO. 4029 Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: Alaska Oil & Gas Cons Comm Altn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Well JOb # log Description Date BL Color CD V-204L1 40010781 OH EDIT OF MWD/LWD 08114104 1 1 V-204L 1 PB1 40010781 OH EDIT OF MWD/LWD 08/14/04 1 1 V-204L2 40010781 OH EDIT OF MWD/LWD 08122/04 1 1 V-204L2 PB1 40010781 OH EDIT OF MWDILWD 08122/04 1 1 V-204PB2 40010781 OH EDIT OF MWDILWD 08/09/04 1 1 V-204L3 40010781 OH EDIT OF MWDILWD 08/28104 1 1 L-201 40010303 OH EDIT OF MWD/LWD 04/03/04 2 1 L-201 PB1 40010303 OH EDIT OF MWD/LWD 03/30/04 2 1 L-201 PB2 40010303 OH EDIT OF MWD/LWD 04101/04 2 1 L-201L1 40010303 OH EDIT OF MWD/LWD 04/09/04 2 1 L-201L2 40010303 OH EDIT OF MWDILWD 04/19/04 2 1 L-201 L3 40010303 OH EDIT OF MWD/LWD 04/26/04 2 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc, Petrotechnical Data Center LR2-1 900 E Benson Blvd Anchorage AK 99508-4254 Schlumberger·DCS 2525 Gambell St. Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Date Delivered: Received by' . £Jö4-o4~ 1Þ ,'-la-3d.. <.:) {:' ">ò ~ ~ DATA SUBMITTAL COMPLIANCE REPORT 4/24/2006 Permit to Drill 2040480 Well Name/No. PRUDHOE BAY UN ORIN L-201L2 Operator BP EXPLORATION (ALASKA) INC JpttrL Ie.¡ A.,~ð bf( API No. 50-029-23202-61-00 MD 13490 ,/ TVD 4623 ,. Completion Date 4/30/2004 ~ Completion Status 1-01L Current Status 1-01L UIC N -- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD / GR I RES / Azimutal DEN / NEW / AIM / PWD Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name lED D Asc Directional Survey ~t Directional Survey Well Cores/Samples Information: (data taken from Logs Portion of Master Well Data Maint Log Log Scale Media Run No Interval Start Stop OHI CH Received Comments 5m2004 5/7/2004 . I J Name Interval Start Stop Sent Received Sample Set Number Comments ADDITIONAL INFOR~.I10N Well Cored? ~ Chips Received? ~ Daily History Received? ~ Formation Tops Analysis Received? ~ -~_..- . ~~---- Comments: ~ Date' . d-l r1i¡~.~ Compliance Reviewed By: Andy, Open hole log data is missing for the following wells: PBU Orion L-201 50-029-23202-00 PBU Orion L-201 L 1 50-029-23202-60 PBU Orion L-201 L2 50-029-23202-61 PBU Orion L-201 L3 50-029-23202-62 Please submit to the Commission as soon as possible; Open Hole digital log data ( LIS, DLlS, or LAS) Open Hole Blue line logs Open Hole reproducables - sepia/mylar or digital graphics files (.pds or .pdf or .emf) TNX for your help. Howard ~ \)11& www.PetroleumNews.com -. NORTH SLOPE J<V4- - O~ Î'of3 i /0 t PETROLEUM NEWS 9 p~~_k;¡ BP completes quad-lateral at Orion Drilling end of viscous equation appears solved; production of heavy oil still an issue because of sand produced with oil and well maintenance issues By KRISTEN NELSON PClroleulI! News Edilor-in-C/lie! The viscous oil resource on Alaska's North Slope - like the natural gas resource there - has been known fOI! decades, but heavy oil has been as stranded as gas, stranded in the ground through lack of the technology and knowledge neces- sary to produce it. BP Exploration (Alaska) has been working on ways to produce viscous oil, also referred to as heavy oil, at Milne Point since the 1990s and now also has viscous oil under t!cvclop- ment. in the western Prudhoe / 1. /2 )\¡~:iV satellItes. ... ....... " Multi-lateral horizontal S E R I E S wells have solved thc drilling sit!e of the viscous equation, but problems remain on the production side, members of BP Exploration (Alaska)'s drilling team told Petroleum News in late September. Viscous oil accumulations lie closcr to the surl[lce and are colder, less mobile and have poorer reservoir quality than conventional crude oil, said Mik Triolo, Greater Prudhoe Bay operations drilling engineer. Triolo worked the Schrader BlufTviscous aceumu- lationat Milne Point before moving over to Orion, working on the early multi-lateral and horizontal well designs in late 1999, early 2000. "And we've progres- sively evolved that technology ever since," he said. That work is continuing at Orion, a Prudhoe Bay western satellite viscous oil accumulation. Multi-lat- eral wells, well bores with multiple holizontallaterals into shallow sands containing viscous oil, make wells productive enough to be economic. First tri-Iateral in 2003 In 2003, BP drilled the first tri-Iateral multi-lateral well on the slope, and this year, the company set a world record with a quad-lateral well. "Horizontal multi-lateral wells have been the key to unlocking those (viscous) reserves... predominate- ly through efficient geo-steering within the segregated sands... Rather than undulating through them," Triolo Abóutthe series Editor s Note: Members of BP }.xploration (Alaska) s drilling group sat down with Petroleum News Sept. 28 to talk about the companys development drilling program, recent drilling records and about the technology that is driving the company s North Slope development drilling. Part.l of this story, printed in the Oct. 10 issue of Petroleum News. included an overview of the company s North Slope drilling activity and an update on its coiled tubing drilling pro- gram. Part 2. which appeared in the Oct. 24 issue, described multi-lateral drilling at Milne Point, and well maintenance work. said, "we actually stick dedicated laterals into each onc of the sand intervals." In addition to better ability to steer through the fonnations, drilling also helps vis- cous oil development with "good well design," he said. A crucial part of thc well is where the laterals branch [¡-om the main well bore, and BP has also been trying dilTerent junction designs, the connection between the main well bore and (he lateral. At Milne Point BP detennined "that the level three, the TAML level three junction, was the junction of choice.. .," Triolo said. lAML stands for Technical Advancement of Multi laterals, an organization set up to regulate "the diffèrent levels of multilateral junction equipment such that everything is standardized," he sait!o "So if Baker comes out with a level-three junc- tion, the eliteria that are set up to distinguish between a level-three and a level-fow, are the same as for Halliburton.. ." The TAML levels, said Mark Johnson, BP senior coiled tubing drilling engineer, "refer to the re-ently capability of the jtUlction and how well it seals or iso- lates at that junction." Re-entry capability and the seal see BP page 10 ~~ 10 , . 11Ì~[']~. continued from page 9 BP :î :.<: ~ ~ z o , provided are the two primary things a jlU1C- ~ tion does, he said. ~ Triolo said BP determined "that we did ~ not need isolation at the junction - what we ~ needed was access to the lateral, so the level- ?;; three junctions became the method of ~ ::¡ choice." 8 First level..three, quad-lateral wen in world BP took its experience at Milne Point to Orion, a westem Prudhoe Bay satell ite, and this year "we drilled the first level-three quad-lateral multi-lateral well in the world," Triolo said. (The accompanying graphic illustratcs such a quad-lateral multi-lateral well.) BP's initial experience with multi-lateral wells was that complicated wells were . I expensive for the wells group to maintain: "We didn't really have cost-efTective ways to work on the wells or impact the flow streams of the wells later in life, so we went back to the drawing board and came up with some criteria that we wanted to see achieved in our well designs, and then worked with our ~endors to come up with a solution to those problems." The current system, he said, was "proved up in Milne Point" and the junction design was modified at Orion "to add more em- ciency to the full life-cycle cost of the well," Triolo said. Well work can now be done through the tubing, with a coiled tubing unit, without the need for a workover rig. The total footage in the quad-lateral wcll, Prudhoe Day unit L-20 1, was almost 35,000 feet, with "almost 28,000 feet of horizontal footage within these thin bcddcd sands," more than five miles of horizontal footage in one well, Triolo said. There were cleanup issues with the well, and BP didn't realize full How potential, but the well had a productivi(y index of 40 (a measure of barrels pcr pound of square inch drawdown), compared to most wells on the slope somewhere in the 20-range. "If we could have opened it up rull bore, we probably would have been somewhat tubing limited," he said. Futility limited Right now the wcll is f~lcility limited, Triolo said. Daren ßeaudo, UP's director of public affairs, said one of the things 8P worked on during the summer production ~ÆYJñr,AWA;f,. VISCOUS 011. ~UAD fltL COMPLETION .. j~ ~1 d) .. fll .& ill ..l :ií!: -.... ~ shutdown at Prudhoe Bay was cleaning sand out of tanks in Gathering Center 2. "One of the constraints that we've had is managing all of this sand," he said. "This is a viscous oil production issue, not a well-rate issue," 13eaudo said, and the issue is the sand produced with the viscous oil. To really produce viscous to the maxi- mum, BP will either have to add facilities to handle sand that comes to the surface or find a way, such as screens, to keep the saud in the rcsclvoir. Not only does sand accumulate in pro- duction facilities, said Andy Kirk, 8P's Alaska drilling and wells perfonnance con- sultant, but it also causcs problems in pipelines because it is corrosive - another reason to keep it in the fonnation. And if a multi-lateral well has to be shut in and the oil stops flowing, Kirk said, the sand can layout along the horizonlal portion oflhe well, creating dunes which plug up the well, making it difficult to re-establish pro- duction when the well is brought back online. Opportunity huge The opportunity for viscous' is huge: '-.,. ,~}Jjt!!;;-,~~~~Féi~~:;"t-~;:~~~.ç-~;4:D ~L ~7~~~~<1r:~~;,.~c;¡[~J'® some 1.6 billion barrels recoverable with current technology, said Gary Christman, UP's Alaska drilling and wells manager. "We're going through kind of a concept selection phase '" and one of the things that we don't know is how we're going to handle all this production, because it is dif- ferent. " "This multi-lateral technology has unlocked the flow potential," said Johnson. "now we can finally gel that reservoir to now at economic rates - and that's bccn the challenge for the last 20 years. .., " There are other issues now connected with getting viscous production to the sur- H1Ce, "but the key thing is that this multi- lateral has unlocked viscous oi\." Christman said the horizontal footage drilled in the quad-lateral well, thc 25,000- feet or horizontal hole, has "not been done anywhere clse in the world: it's just huge, just huge stuff." The issues, now, Christman - said, are sand control and long-term serviceability of the multi-lateral wells: "The multi laterals arc there, but do we know we can keep them all producing for many, many years? "It will be a sand control issue... And ~Dlf-04-''6 PETROLEUM NEWS · WEEK OF OCTOBER 31, 2004 "Horizontal nlulti-Iateral wells have been the hey to unloching those (viscous) reserves... predominately through efficient geo-steeling within the segregated sands... Rather than undulating throug~~ theIn, we actually stich dedicated là!erals into each one of the sand intervals." - Mik Triolo, BP Exploration (Alaska) drilling engineer long-tenn well selVieeability," he said. Well design evolved here The men said this is a slope-wide effort, with a slope-wide viscous team including BP, ConocoPhillips and ExxonMobil, working the viscous development issue, and contractors for the fIrms developing the technology being used. Triolo said that while the well design in use at Orion was evolved at ill', "we've also shared this well design with ConocoPhiIlips and so they're using it on their development," and ConocoPhillips is "learning things over there that they're sharing with us," as part ofthe regional vis- cous team. ConocoPhillips operates the Kuparuk River unit viscous West Sak development effort. The quad multi-lateral has been drillcd, and a quintuple multi-lateral is planned for later this year, Triolo said, the first such well on the slope. That well, however, is not planned with five junctions coming out from the main well bore, because "some of these sands arc so thin that they cannot eco- nomically support the cost of a multi-later- al junction," so coiled tubing technology will be used to do an open-hole junction. Four laterals will come ofTLhe main wel! bore; one of those laterals will split again. The whole well will be drilled with a rotary rig, Triolo said, but will usc some coiled-tubing developed technology, scaled up in size to rotary applications. Some of that technology was developed for use over at Kupamk, he said, so there is technology sharing among lhe di fTerent drilling groups, as well as between 131' and ConocoPhillips. Drilling, selViccs and materials contrac- tors responsible for technology for BP's drilling program include: 13aker Hughes lnteq; Doyon Drilling; Halliburton; Nabors Drilling; Nordic Calista Drilling; Schlumberger; and WellTec Tractor. . ) STATE OF ALASKA ') ALASKA OIL AND GAS CONSERVATION COMI'VIISSION 'Iir':,.;: WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised: 'U1j28/b4~il~~~lQ~ Production ,h V\l:èll Class: II Development 0 Exploratory o Stratigraphic 0 Service 12. Permit to Drill Number 204-048 13. API Number 50- 029-23202-61-00 14. Well Name and Number: t 1a. Well Status: II Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD / GR / RES / Azimuthal DEN / NEU / AIM / PWD CASING, LINER AND CEMENTING RECORD 1,:I::S¡;;"E/UI~P',;.Q, ;~tffl:;MØ:t!;'I:a~$:rI'~q;:D,E~t~I,'~ø'lil':I:'i'I:!.I:,8:ó'~~,II'I!'I!:' ':"'·'II'!~I;Øel"l:i::·I" il:sb:r~bM;:f'i:.I"I~;I~o'l?""I~,1è,otJØMI::IJ;';;IIII'i.!:$I2;I:2"I;'IIII}::11 Surface 108' Surface 108' 48" 260 sx Arctic Set (Approx.) 29' 3197' 29' 2642' 13-1/2" 630 sx AS Linte, 355 sx Class 'G' 27' 6229' 27' 4514' 9-7/8" 613 sx Class 'G' 6224' 13448' 4513' 4622' 6-3/4" Uncemented Slotted Liner 5982' 6200' 4412' 4504' N/A Uncemented Tieback Liner o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 57' NSL, 1503'WEL, SEC. 34, T12N, R11E, UM (OBa) Total Depth: 1470' NSL, 4566' EWL, SEC. 35, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583325 y- 5978321 Zone- ASP4 TPI: x- 585375 y- 5981083 Zone- ASP4 Total Depth: x- 591494 y- 5977288 Zone- ASP4 18. Directional Survey II Yes 0 No 22. ~': 01!,:"!I:'" ':',., 'f?"", '11'1,,',,'.1"" ','¡II';":: :!" .'~ 1",11 ",I: : III~A§.I~,~, "II,i "1,111 ,:,1"",,1 ::;:':,':~:::::,' i,!I;~'~~~'i:f';~';':': 1:';", ':':,;:':,:: 20" x 34" 215.5# 45.5# 29.7# 12.6# 12.6# A53 L-80 L-80 L-80 L-80 10-3/4" 7-5/8" 4-1/2" 4-1/2" 23. Perforations op'en to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6295' -13405' 4534' - 4621' One Other 5. Date Comp., Susp., or Aband. 4/30/2004 6. Date Spudded 4/14/2004 7. Date T.D. Reached 4/19/2004 8. KB Elevation (ft): 78.7' 9. Plug Back Depth (MD+TVD) 13490 + 4623 10. Total Depth (MD+ TVD) 13490 + 4623 11. Depth where SSSV set (Nipple) 2266' MD 19. Water depth, if offshore N/A MSL SIZE 4-1/2", 12.6#, L-80 PBU L-201 L2 15. Field / Pool(s): Pr~dhoe Bay Field / Orion Ft Ft 16. Property Designation: ADL ADL 028238 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) ":,I~M"G¡'¡N11::':/ 1"L:I"II'II""11::r;'I':~"III.I¡.":I'11 ::lli'IIßQ[ITEd:'" DEPTH SET (MD) 6000' PACKER SET (MD) 5873' \B1MS 8FL Form 10-407 Revised 12/2003 CONTINUED ONCl~l sG \ N ^ L DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 150 Bbls of Diesel GAs-McF 51 WATER-Bsl 21 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): June 28, 2004 Gas Lift Date of Test Hours Tested PRODUCTION FOR Oll-Bsl 7/9/2004 2 TEST PERIOD -+ 203 Flow Tubing Casing Pressure CALCULATED ........ Oll-Bsl Press. 70C 1,300 24-HoUR RATE""" 2,432 GAs-McF 607 W A TER-Bsl 249 CHOKE SIZE GAS-Oil RATIO 75 249 Oil GRAVITY-API (CORR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None JUl 2 tj ~ ~.'~ . I ,:--: \~,}t\ ~ 9 (,', 19f 1'8.' ) GEOLOGIC MARKERS 29. ) FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OBa 6228' 4514' None Schrader Bluff OBb 10960' 4572' Schrader Bluff OBa 11110' 4588' Schrader Bluff OBa 11568' 4579' Schrader Bluff OBa 11780' 4576' 1111 ")00 K, l> /,' ,ii, 30. list of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~.~ TiUe Technical Assistant Date 07-d..ß-()tf PBU L-201 L2 204-048 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Michael Triolo, 564-5774 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMIŠSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD / GR / RES / Azimuthal DEN / NEU / AIM / PWD CASING, LINER AND CEMENTING RECORD S~J!ftNG: :O~prH,MP:.'.··.· ,1,ßEJ;ëJ\I~~:DFÄt~I'WP'" "'I¡:'hfOLI;¡,·.',.'¡ , ·iTdp':li:.,~:;BbnGM·· ';,I:,i¡liT51?:¡,il:,B,bW0M' :,,¡:' iIIS,I¿EI\':;~i! Surface 108' Surface 108' 48" 260 sx Arctic Set (Approx.) 29' 3197' 29' 2642' 13-1/2" 630 sx AS Linte, 355 sx Class 'G' 27' 6229' 27' 4514' 9-7/8" 613 sx Class 'G' 6224' 13448' 4513' 4622' 6-3/4" Uncemented Slotted Liner 5982' 6200' 4412' 4504' N/A Uncemented Tieback Liner o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: . BP Exploration (Alaska) Inc. : 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11 E, UM Top of Productive Horizon:!}? tf1./ 57' NSL, 1503'WEL, SEC.~, T12N, R11E, UM (OBa) Total Depth: 1470' NSL, 4566' EWL, SEC. 35, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583325 y- 5978321 Zone- ASP4 TPI: x- 585375 y- 5981083 Zone- ASP4 Total Depth: x- 591494 y- 5977288 Zone- ASP4 18. Directional Survey 181 Yes 0 No 22. CASING, SIZE II, ' ",1,' ',I ,,' ? ~,:, 1:1,':., :<.,; ': ';, ,. :: : I;' '-:,; :: I'W~;'P!ËF('IFT. ....., 215.5# 45.5# 29.7# 12.6# 12.6# I , 'I I I I" ···'·'11...··..'.·.,1, ," ,Ç3RADE;,'" A53 L-80 L-80 l-80 l-80 20" x 34" 10-3/4" 7-5/8" 4-1/2" 4-1/2" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6295' -13405' 4534' - 4621' 26. Date First Production: Not on Production Yet Date of Test Hours Tested One Other 5. Date Comp., Susp., or Aband. 4/30/2004 6. Date Spudded 4/14/2004 7. Date T.D. Reached 4/19/2004 8. KB Elevation (ft): 78.7' 9. Plug Back Depth (MD+ TVD) 13490 + 4623 10. Total Depth (MD+TVD) 13490 + 4623 11. Depth where SSSV set (Nipple) 2266' MD 19. Water depth, if offshore N/A MSL SIZE 4-1/2", 12.6#, L-80 25.: 1 b. Well Class: 181 Development 0 Exploratory o Stratigraphic Test 0 Service 12. Permit to Drill Number 204-048 13. API Number 50- 029-23202-61-00 14. Well Name and Number: PBU L-201L2 15. Field / Pool(s): Prudhoe Bay Field / Orion Ft Ft 16. Property Designation: ADL ADL 028238 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) ':AMO~~T:II,I :, ii: PULLED, I' DEPTH SET (MD) 6000' PACKER SET (MD) 5873' '.AqID,FRAÇTGR~, I.CEMENI,9PIJ~eZE"ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 150 Bbls of Diesel PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A Oll-BBL CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". R E C; E ~ \/E 0 None JUN 022004 PRODUCTION FOR TEST PERIOD -+ Flow Tubing Casing Pressure CALCULATED ....... Oll-Bsl Press. 24-HoUR RATE""'" 27. : ~~~f. '.' Ao/ ¡ : "-''rT""'i'' V ~ ... Form 1 0-407'~ev¡s'êd""1~l2003 \ØMS Bfl GAs-McF W ATER-BsL GAs-McF WATER-BsL ,}\~~ 0 8, rynn ~ CHOKE SIZE GAS-OIL RATIO OIL GRAVITY-API (caRR) CONTINUED ON REVERSE SIDE A¡as;!.\a m¡ ,~, 8:15 Cons. ComHlission Anchorage U RIG I N A __ G J:: ) ') 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OBa 6228' 4514' None Schrader Bluff aBb 10960' 4572' Schrader Bluff aBa 11110' 4588' Schrader Bluff aBa 11568' 4579' Schrader Bluff aBa 11780' 4576' 30. list of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~AJ\i..p~ ~ Title Technical Assistant Date o(p-oa-ol( PBU L-201l2 204-048 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Michael Triolo, 564-5774 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 SRE*Pl...QR.A.TION leak-Off Test Summary 1 Legal Name: L-201 Common Name: L-201 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure' (BHP) EMW 3/21/2004 LOT 3,197.0 (ft) 2,642.0 (ft) 9.20 (ppg) 575 (psi) 1 ,838 (psi) 13.39 (ppg) 3/27/2004 FIT 7,047.0 (ft) 4,673.0 (ft) 9.20 (ppg) 680 (psi) 2,913 (psi) 12.00 (ppg) 4/5/2004 FIT 6,372.0 (ft) 4,562.0 (ft) 9.20 (ppg) 665 (psi) 2,845 (psi) 12.01 (ppg) 4/14/2004 FIT 6,229.0 (ft) 4,514.0 (ft) 9.20 (ppg) 660 (psi) 2,817 (psi) 12.01 (ppg) ~ 4/23/2004 FIT 6,025.0 (ft) 4,440.0 (ft) 9.30 (ppg) 646 (psi) 2,791 (psi) 12.10 (ppg) -' Printp.rl' 5/31200.1 8°.1<;:51 M-" ) ) ", ". ~ .... ,. . 8P EXPLORATION ',' . .' . ,," .", ". .~. 'r ,,'Op~r.atiøns S4mmary Report Page 1 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 . Date From - To Hours Task Code NPT Phase Description of Op~rations ' 3/16/2004 12:00 - 14:00 2.00 MOB P PRE Blow down steam and water lines. Rig down for move. lay rig mats on L-201 14:00 - 15:00 1.00 MOB P PRE Move camps and pits. 15:00 - 16:00 1.00 MOB P PRE Move rig off of L-211 and position on L-201 RIG ACCEPTED @ 16:00 hrs 16:00 - 19:30 3.50 RIGU P PRE NU diverter, riser and Hydril. 19:30 - 21 :30 2.00 RIGU P PRE Level rig and pits 21 :30 - 00:00 2.50 RIGU P PRE RU pits. Position Swaco unit and cuttings tank. 3/17/2004 00:00 - 01 :00 1.00 RIGU P PRE Load BHA #1 in pipe shed. Continue NU diverter, riser and Hydril. 01 :00 - 04:30 3.50 RIGU P PRE Take on water and build spud mud. Change out riser 04:30 - 06:00 1.50 RIGU P PRE Change out top drive quill for 5" DP 06:00 - 07:00 1.00 RIGU P PRE PU Jewelry for BHA #1 07:00 - 10:30 3.50 RIGU P PRE MU 35 stands of 5" DP and stand back in derrick 10:30 - 12:00 1.50 RIGU P PRE MU HWDP and Collars, stand back in derrick. 12:00 - 17:30 5.50 RIGU P PRE Move 105 joints of 5" DP into pipe shed. MU 35 stands, stand back in derrick. 17:30 - 18:30 1.00 RIGU P PRE MU BHA #1 18:30 - 19:00 0.50 BOPSUF P PRE Function test diverter. Witness of diverter test waived by John Crisp with AOGCC. 19:00 - 19:30 0.50 RIGU P PRE Pre-spud meeting with Anadrill, MI, Sperry, GyroData and all rig personnel. 19:30 - 20:00 0.50 RIGU P PRE RU Sperry WL unit and GyroData for gyro surveys. 20:00 - 21 :00 1.00 RIGU P PRE Finish MU BHA #1. Orient motor and MWD 21 :00 - 21 :30 0.50 DRILL P SURF RI H and tag up at 108'. Fill stack. Circulate mud system checking for leaks. 21 :30 - 00:00 2.50 DRILL P SURF Drill 13-1/2" surface hole from 108' to 170'. RPM = 50 Torque = 1.7k FtLb GPM = 600 @ 500 psi P/U 55k SIO 51 k ROT 53k Run gyro survey every stand drilled. ART = 0.25 hrs SPUD @ 21 :30 3/18/2004 00:00 - 02:30 2.50 DRILL P SURF Drill 13-1/2" surface hole from 170' to 447'. Sliding 100% to build angle WOB = 2-20 klbs GPM = 600 - 1006 psi on Btm, 765 psi off Btm P/U 69k SIO 64k Run gyro surveys at 170', 196' and 447' 02:30 - 03:30 1.00 DRILL P SURF Stand back 3 stands to PU Jar stand. RIH to 447' 03:30 - 14:00 10.50 DRILL P SURF Drill 13-1/2" surface hole from 447' to 1570'. Sliding as required to build angle and maintain azimuth. WOB = 30-35klbs RPM = 80 Printed: 51312004 8:46:01 AM page 2 of 34 BPEXPLORATION Oþeration~..·...$urnm·~ r.Y:.B.~port Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Task Code NPT Phase 3/18/2004 03:30 - 14:00 10.50 DRILL P SURF 14:00 - 14:30 0.50 DRILL P SURF 14:30 - 16:30 2.00 DRILL P SURF 16:30 - 17:00 0.50 DRILL P SURF 17:00 - 18:30 1.50 DRILL P SURF 18:30 - 00:00 5.50 DRILL P SURF 3/19/2004 4.00 DRILL P SURF 00:00 - 04:00 04:00 - 05:00 1.00 DRILL P SURF 05:00 - 08:00 3.00 DRILL P SURF Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description..·.of··Opera.tions Torque off Btm = 2.3k FtLb, Torque on Btm = 7-9k FtLb GPM = 750 @ 2050 psi on Btm, 1570 psi off Btm P/U 87k SIO 80k ROT 82k Circulate BU volume X 2 Monitor well - static. POH for new bit. started pulling over at 1100', pumped out to 950'. Stand back BHA and drop off UBHO sub. PU new HTC 13-1/2" MX-C1. Clean rig floor. RIH to 1478'. MU top drive and wash last stand to bottom at 1570'. Drill 13-1/2" surface hole from 1570' to 2360'. Sliding as required to build angle and maintain azimuth. WOB = 30-35klbs RPM = 80 Torque off Btm = 5k FtLb, Torque on Btm = 8-1 Ok FtLb GPM = 750 @ 2200 psi on Btm, 1820 psi off Btm P/U 100k SIO 84k ROT 90k P/U 104k SIO 89k No Pumps Backream each stand at drilling rate. Intermittent gas hydrates from 1900' to 2360' AST = 8.66 hrs. ART = 3.49 hrs. Formation tops: SV4 - 1829' MD Base of Permafrost - 1892' MD SV3 - 2306' MD SV2 - 2547' MD Drill 13-1/2" surface hole from 2360' to 3210'. Sliding as required to build angle and maintain azimuth. WOB = 35klbs RPM = 80 Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb GPM = 750 @ 2200 psi on Btm, 1990 psi off Btm P/U 114k SIO 88k ROT 100k Backream each stand at drilling rate. Intermittent gas hydrates. AST = 1.95 hrs. ART = 0.84 hrs Top of the SV1 @ 3050' MD Circulate BU volume X 2. 770 gpm @ 2060 psi, reciprocate DP at 100 rpm. Monitor well - static. POH on short trip to HWDP. Overpulls to 25 klbs at 2050', 1850-1800', 1450'. Work each spot & clean Printed: 5/312004 8:46:01 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours Task Code. NPT Phase, Description of ,Operations 3/19/2004 05:00 - 08:00 3.00 DRILL P SURF up - OK. Tight spot at 1400' - swabbing. Kelly up & circ @ 300 gpm/350 psi. Work up thru tight spot and precautionary circ up to 900' w/ minor pulls. Continue POH to HWDP. 08:00 - 09:30 1.50 DRILL P SURF RIH to bottom. Wipe minor tight spots at 1090' and 1300'-1500'. 09:30 - 12:00 2.50 DRILL P SURF Circ last stand to bottom and cond mud for casing & cement- stage up to 770 gpm @ 2320 psi and 120 rpm. Reduce MW to 9.6 ppg & FV to 225. 12:00 - 14:30 2.50 DRILL P SURF Monitor well - static. POH to run csg. Tight spot at 2032' - swabbing. MU top drive and circ @ 300 gpm/325 psi. Pump out to 2140'. POH to 1325', tight spot - swabbing. Work thru. POH with no more problems to HWDP. 14:30 - 15:30 1.00 DRILL P SURF Monitor well at HWDP - static. Stand back HWDP, Jars and DC's 15:30 - 16:30 1.00 DRILL P SURF LD BHA #2 16:30 - 17:00 0.50 DRILL P SURF Clean and clear rig floor. 17:00 - 17:30 0.50 CASE P SURF MU landing joint and make dummy run. 17:30 - 19:30 2.00 CASE P SURF RU csg equipment 19:30 - 20:00 0.50 CASE P SURF PJSM with MI, Nabors Casing and all rig personnel on running 10-3/4· surface casing. 20:00 ~ 00:00 4.00 CASE P SURF MU shoe track and test float equipment. Run 76 jts 10-3/4·, 45.5#, L-80, BTC surface casing. Taking weight at 11 DO' work through to 1200'. Break circulation on jt #40. Taking weight again from 1920' to 2500' then clear to bottom. 25 bow spring centralizers on the collars of jts #1 and #3 thru #26 Midnight depth - 2582' 3/20/2004 00:00 - 01 :00 1.00 CASE P SURF Continue running 10-3/4",45.5# surface casing. 01 :00 - 01 :30 0.50 CASE P SURF MU landing joint and land casing with shoe at 3197'. 01 :30 - 02:00 0.50 CEMT P SURF RD fill-up tool and blow down top drive. RU cement head. 02:00 - 04:00 2.00 CEMT P SURF Circulate and condition hole for cement. Stage pumps to 10 bpm @ 760 psi. Reciprocate csg 5-10', P/U 152k Ibs S/O 96k Ibs. No losses. 04:00 - 04:30 0.50 CEMT P SURF PJSM with DS, NAD, MI, Veco, BP prior to starting cement job. 04:30 - 05:20 0.83 CEMT P SURF Air up & prime up cementers. Mix & pump 5 bbls CW100 preflush. Test lines to 3500 psi. Pump remaining 15 bbls CW100. 05:20 - 05:40 0.33 CEMT P SURF Mix & pump 70 bbls Mudpush II spacer at 10.2 ppg. 05:40 - 06:40 1.00 CEMT P SURF Release bottom plug. Mix & pump 480 bbls (605 sx) ArcticSet lite slurry at 10.7 ppg - 8.5 bpm @ 390 psi. 06:40 - 07:00 0.33 CEMT P SURF Switch to tail. Mix & pump 74 bbls (355 sx) Class G slurry at 15.8 ppg - 5 bpm @ 350 psi. 07:00 - 07:30 0.50 CEMT P SURF Release top plug and kick out with 10 bbls water from cementers to clear lines. Switch to rig pumps and displace with mud at 12 bpm @ 800 psi. Getting good cement returns to surface 2000 strokes into displacement. Reciprocated pipe while pumping cement and 205 bbls into displacement - then landed on ring for remainder of job. Slow to 3 bpm for last 15 bbls displacement. Bump plug with Printed: 51312004 8:46:01 AM BP EXPLORATION Operatiºns S.uOlroªryReport, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date From-To Hours Task Code NPT Phase 3/20/2004 07:00 - 07:30 0.50 CEMT P SURF 07:30 - 08:00 0.50 CEMT P SURF 08:00 - 14:00 6.00 DIVRTR P SURF 14:00 - 20:30 6.50 BOPSUP P SURF 20:30 - 21 :00 0.50 BOPSUP P SURF 21 :00 - 00:00 3.00 BOPSUF P SURF 3/21/2004 00:00 - 00:30 0.50 BOPSUP P SURF 00:30 - 01 :00 0.50 BOPSUF P SURF 01 :00 - 03:30 2.50 DRILL P INT1 03:30 - 05:00 1.50 DRILL P INT1 05:00 - 06:00 1.00 CASE P SURF 06:00 - 07:30 1.50 DRILL P INT1 07:30 - 09:00 1.50 DRf LL P INT1 09:00 - 10:00 1.00 DRILL P INT1 10:00 - 11 :00 1.00 DRILL P INT1 11 :00 - 12:30 1.50 DRILL P INT1 12:30 - 13:00 0.50 DRILL N FLUD INT1 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 DeSGFiptionØ~rØp~rati()ns 1500 psi at 299.6 bbls total displacement. Bleed off pressure - floats holding. Full returns throughout pumping and displacing cement. Got back 125 bbls good lead slurry. CIP at 07:30 hrs on 3/20/04. Flush flow line and stack. Blow down and RD cement lines. RD cement head. Break out and LD landing joint. ND diverter, riser and Hydril. Move diverter line out of cellar. NU speed head, tbg spool and BOP. 15:30 hrs - take on new 9.2# LSND mud PJSM with all rig personnel on testing BOPE Test BOPE to 250/3500 psi. Test annular to 250/3500 psi. Witness of BOP test waived by Jeff Jones with AOGCC. Continue testing BOPE 250/3500 psi Pull test plug and install wear bushing. RD test equipment. PU BHA #3,9-7/8" directional drilling assembly. Shallow test MWD. RIH to 2834' Test 10-3/4" 45.5# casing to 3500 psi for 30 minutes. Cut and slip 52' of drilling line. Service top drive. Wash down from 2834', tag float collar at 3110'. Drill shoe track and rat hole to 3210', continue drilling 20' of new hole to 3230' RPM = 50 Torque = 7k FtLb GPM = 580 @ 1360 psi ROT 97k Displace well to new 9.1 ppg LSND mud. RPM = 50 GPM = 50 @ 1300 psi ROT 97k Perform LOT, EMW = 13.3 ppg. 575 psi surface pressure with 9.1 ppg mud at 2642' TVD. Calculated kick tolerance 149 bbls Establish baseline ECD = 9.67 ppg Drill 9-7/8" intermediate hole from 3230' to 3496', rotating 100% WOB = 20 klbs RPM = 80 Torque off Btm = 4.6k FtLb, Torque on Btm = 6-7k FtLb GPM = 600 @ 1520 psi on Btm, 1190 psi off Btm P/U 115k S/O 85k ROT 98k Backream every stand at 600 gpm and 80 rpm, reducing flow rate to 420 gpm on down stroke. Calculated ECD = 9.66 ppg, Actual ECD = 10.30 ppg POH 3 stands to shoe. Skakers blinding off apparently due to oil wetting of bentonite in new LSND mud. Blinding off of shakers required pump rate reductions, unable to drill ahead. Printed: 5/312004 8:46:01 AM " ) .' ,. - -,-, e.R,gXPLORATIQN: "O:p' ···.~ratiønssumrnåry.···Repo........r.t.'........... ': , '., ", :';, :,' ',:',:....-:'::. ': /'.: :' .":. .-', ,,:,,:: ,',.. '.,..:: ",; '. ",' '.:.,: :,' ,~'t,d';':::'''' '. ': ",..; :':: .-:':-' . ,:':' '~ ¡,":' .,',"", t,,', :" ';"'~:':",,'... '. ".~" ; .. " Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To . Hours Task Code NPT Phase Description of Operë;itions 3/21/2004 13:00 - 17:00 4.00 DRill N FLUD INT1 Circulate and condition mud at 50 gpm. Screened down shakers and circulated until the blinding problem was eliminated. Able to screen back up and circulate at drilling rate 17:00 - 17:30 0.50 DRILL N FLUD INT1 RIH to 3400', wash to bottom at 3496' 17:30 - 18:30 1.00 DRILL P INT1 Stage up pumps and drill from 3496' to 3683'. WOB = 15 klbs RPM = 80 Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm P/U 117k S/O 90k ROT 105k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg 18:30 - 19:30 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure on the top drive lube pumps. Change out filter, regained oil pressure. 19:30 - 20:30 1.00 DRILL N RREP INT1 RIH to 3589', wash to bottom at 3683' 20:30 ~ 21 :00 0.50 DRILL N INT1 Stage up pumps and drill from 3683' to 3776'. WOB = 15 klbs RPM = 80 Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm P/U 117k S/O 90k ROT 105k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg AST = 0.23 hrs. ART = 1.08 hrs. 21:00 - 22:00 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure in the top drive lube pump again. 22:00 - 00:00 2.00 DRILL N RREP INT1 Change out top drive lube pump. 3/22/2004 00:00 - 01 :00 1.00 DRILL N RREP INT1 Continue change out top drive lube pump. 01 :00 - 01 :30 0.50 DRILL N RREP INT1 RIH to 3686', wash last stand to bottom at 3776' 01 :30 - 00:00 22.50 DRILL P INT1 Stage up pumps and drill from 3776' to 5844'. Sliding as required to maintain inclination and azimuth. WOB = 15 klbs RPM = 80 Torque off Btm = 6-7k FtLb, Torque on Btm = 8-16k FtLb GPM = 650 @ 2060 psi on Btm, 1735 psi off Btm P/U 148k SIO 110k ROT 130k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Printed: 51312004 8:46:01 AM Page 6 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Däte L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 DesQriptionof()per~itions 3/22/2004 01 :30 - 00:00 From..ToHours Task Coqe NPT Phase INT1 Calculated ECD = 9.87 ppg, Actual ECD = 10.00 ppg 3/23/2004 00:00 - 17:00 17:00 - 19:00 19:00 - 20:00 20:00 - 21 :30 21 :30 - 00:00 3/24/2004 00:00 - 00:30 00:30 - 01 :00 22.50 DRILL P 17.00 DRILL P 2.00 DRILL P 1.00 DRILL P 1.50 DRILL P 2.50 DRILL P 0.50 DRILL P 0.50 DRILL P AST = 5.89 hrs. ART = 3.89 hrs. INT1 Formation tops: UG1 4775' MD, 3674' TVD Ma 5300' MD, 4020' TVD Directional drill from 5844' to 7055'. Sliding as required to maintain inclination and azimuth. WOB = 20-25 klbs RPM = 80 Torque off Btm = 7 -8k FtLb, Torque on Btm = 8-1 Ok FtLb GPM = 650 @ 2230 psi on Btm, 1993 psi off Btm P/U 147k S/O 106k ROT 125k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.02 ppg, Actual ECD = 10.37 ppg AST = 1.88 hrs. ART = 9.32 hrs. INT1 Formation Tops: OA 6048' MD 4441' TVD OBa 6227' MD 4513' TVD OBb 6372' MD 4560' TVD OBd 6996' MD 4664' TVD Circulate BU vol X 2,670 gpm @ 2106 psi, reciprocate DP at 120 rpm. INT1 Calculated ECD = 10.02 Initial ECD = 10.42 ECD prior to POH = 10.19 Monitor well - static. POH 15 stands to 5751', no problems INT1 P/U 155k SIO 105k no pumps Pump dry job and continue POH. Attempting to swab at 3451', RIH to 3655' Stage up pumps and begin backreaming from 3655'. Backream out to 3451, attempting to pack off. RIH 1 stand to 3544'. Attempt to backream, still packing off. RIH another stand to 3683', bring pumps up to 600 gpm watching for ECD spikes. Able to circulate no problem, start backreaming out from 3683' INT1 600 gpm @ 1247 psi and 85 rpm INT1 Midnight depth 3582' Continue backreaming out from 3582' to csg shoe at 3197'.600 gpm @ 1250 psi and 90 rpm Pump hi-vis sweep around at csg shoe. 600 gpm @ 1200 psi INn Printed: 5/3J2oo4 8:46:01 AM ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date' From - To Hours Task Code NPT Phase Description of Operations, 3/24/2004 00:30 - 01 :00 0.50 DRILL P INT1 and 80 rpm Calculated ECD = 9.86 Actual ECD = 9.94 01 :00 - 01 :30 0.50 DRILL P INT1 Service top drive 01 :30 - 03:30 2.00 DRILL P INT1 RIH to 7055, wash last stand down. No problems on RIH. P/U 115k S/O 90k 03:30 - 05:30 2.00 DRILL P INT1 Stage up pumps and circulate BU volume X 3. Circulate lo-hi vis sweep surface to surface. 670 gpm @ 200 psi and 120 rpm. P/U 147k S/O 106k ROT 125k Torque = 10k FtLb Calculated ECD = 9.93 ECD prior to POH = 10.03 05:30 - 06:30 1.00 DRILL P INT1 MOnitor well- static. POH 10 stands to 6125'. P/U 165k S/O 100k 06:30 - 11 :00 4.50 DRI LL P INT1 Slug DP and continue POH laying down 5" DP. 11 :00: 12:00 1.00 DRILL P INT1 RIH with 11 stands 5" DP from derrick 12:00 - 12:30 0.50 DRILL P INT1 Continue LDDP 12:30 - 15:00 2.50 DRILL P INT1 PJSM with Anadrill and all rig personnel on removing RA source and laying down BHA. LD BHA #3, remove source from ADN. 15:00 - 15:30 0.50 DRILL P INT1 Clean and clear rig floor. 15:30 - 16:30 1.00 BOPSUP P INT1 Flush stack and pull wear bushing. 16:30 - 18:00 1.50 BOPSUPP INT1 Change top rams to 7-5/8". Install test plug and test door seals to 3500 psi. 18:00 - 20:00 2.00 CASE P INT1 MU landing joint and make dummy run. RU 7-5/8" csg equipment. 20:00 - 20:30 0.50 CASE P INT1 PJSM with Nabors Casing, MI and all rig personnel on running 7-5/8" csg. 20:30 - 00:00 3.50 CASE P INT1 MU and test float equipment. RUN 7-5/8", 29.7#, L-80, BTC-M intermediate csg as per running orders. Midnight depth 1696' 3/25/2004 00:00 - 01 :30 1.50 CASE P INT1 Continue Run 7-5/8",29.7#, L-80 csg from 1696' to 3197' at 1 minute per jt. Break circulation every 20 jts. 01 :30 - 02:00 0.50 CASE P INT1 Circulate 1.5 X csg vol at the 10-3/4" csg shoe. 7 bpm @ 350 psi. P/U 120k S/O 100k no pumps 02:00 - 12:00 10.00 CASE P INT1 Continue running 7-5/8" csg into open hole. 1 minutefJt above 5000', 1.5 minutefJt below 5000'. Fill every jt, break circulation every 5 jts, circulate for 15 minutes every 15 jts. and CBU every 30 jts. Good displacement, no losses while running csg. 12:00 - 12:30 0.50 CEMT P INT1 RD fill-up tool. RU cement head. 12:30 - 14:00 1.50 CEMT P INT1 Stage up pumps and circulate and condition hole. Max rate 7 bpm @ 502 psi Reciprocate DP. P/U 225k S/O 110k 14:00 - 14:30 0.50 CEMT P INT1 PJSM with Schlumberger, MI and all rig personnel on cementing 7-5/8" csg. 14:30 - 17:00 2.50 CEMT P INT1 Air up and batch up cementers. Pump 5 bbl CW-1oo. Test lines to 3500 psi, pump remaining 20 bbls CW-1oo. Pump 45 Printed: 5/312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: , Pél9ë8of34 BP EXPLOBATION Op~rati9ns $u I11lT1ðryReport L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 3/25/2004 14:30 - 17:00 From'"" To Hours Task Code 17:00 - 18:00 3/26/2004 18:00 - 19:30 19:30 - 20:00 20:00 - 22:00 22:00 - 00:00 00:00 - 13:00 13:00 - 14:00 14:00 - 15:00 2.50 CEMT P INT1 1.00 CEMT P INT1 1.50 CASE P 0.50 WHSUR P 2.00 CEMT P 2.00 CEMT P 13.00 CEMT P INT1 INT1 INT1 INT1 INT1 1.00 BOPSUF P 1.00 WHSUR P INT1 INT1 15:00 - 19:30 4.50 BOPSURP INT1 19:30 - 20:30 1.00 BOPSUF P INT1 20:30 - 22:00 1.50 BOPSUF P INT1 22:00 - 00:00 2.00 DRILL P PROD1 3/27/2004 00:00 - 01 :00 1.00 DRILL P PROD1 01 :00 - 04:30 3.50 DRILL P PROD1 04:30 - 05:00 0.50 DRILL P PROD1 05:00 - 07:30 2.50 DRILL P PROD1 07:30 - 09:00 1.50 CASE P INT1 09:00 - 11 :30 2.50 DRILL N WAIT PROD1 11 :30 - 13:00 13:00 - 14:00 bbls 10.5 ppg Mud push. Drop bottom plug and pump 126 bbl (589 sxs) 15.8 ppg Class-G cement. Drop top plug and kick out with 10bbls water from cementers to wash up lines. Switch to rig pumps and displace with seawater at 7 bpm, ICP = 117 psi. Slow rate to 3 bpm to bring mud push around the shoe then increase rate back to 7 bpm. Able to reciprocate casing throughout cement job, land csg 290 bbls into displacement. Slow rate to 3 bpm for the last 20 bbls of displacement, FCP = 750 psi. Bump plugs with 1000 psi on calculated strokes, floats holding. CIP 17:45 RD cement head. LD landing joint and RD csg equipment. RILDS on packoff. Test packoff to 5000 psi. change top drive quill to 4" HT-40, change out bails. Clean mud and cement out from under rotary table. PJSM with all rig personnel. Install wear bushing. PU 4" DP, stand stands back in derrick. RU and inject 130 bbls 9.3 ppg mud down the 10-3/4" X 7-5/8" annulus. Lot EMW = 13.5 ppg, 580 psi surface pressure and a shoe TVD of 2642'. 3bpm ICP = 620 psi FCP = 550 psi SIP = 400 psi Change top rams to 3-1/2" X 6" variables RU Little Red, Test lines to 3500 psi. Inject 91 bbls dead crude down 10-3/4" X 7-5/8" annulus. ISP = 625 psi FCP = 890 psi SIP = 672 psi RU and test BOPE 250/3500 psi. Witness of BOP test waived by Chuck Sheave with AOGCC. Pull test plug. RD test equipment. Install wear bushing. PJSM with all rig personnel. Cut and slip 91' of drill line. Service top drive, blocks and crown. PU and MU BHA #4,6-3/4" directional assembly. Continue PU and MU BHA #4 RIH, picking up single joints of DP, to 4000'. Function test MWD. Continue RIH, picking up single joints of DP to 6892'. Wash down and tag cmt at 6933'. RU and test 7-5/8" csg to 3500 psi for 30 minutes. Waiting on trucks for MOBM displacement. Pull 9 stands of DP, Move 4" HT -40 HWDPin derrick to access 4" HT-38 HWDP. RIH with 4" HT-38 HWDP, POH Laying down. RIH with 4" HT-40 HWDP. PROD1 Pump 40 bbl MOBm spacer. Displace well to 9.2 ppg MOBM. 286 gpm @ 2500 psi. PROD1 Drill shoe track, rathole and 20' of new hole to 7075'. 1.50 DRILL P 1.00 DRILL P Torque off Btm = 3k FtLb, Torque on Btm = 4k FtLb GPM =286 @ 2620 psi on Btm, 2500 psi off Btm Printed: 5/312004 8:46:01 AM ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 NPT Phase Description of Operations., 3/27/2004 13:00 - 14:00 14:00 - 14:30 1.00 DRILL P 0.50 DRILL P 14:30 - 15:30 1.00 DRILL P PROD1 PROD1 CBU 286 gpm @ 2500 psi PROD1 Perform 12.0 ppg EMW FIT. 680 psi, 9.2 ppg MOBM, 4673' TVD. 15:30 - 18:00 2.50 DRILL P Establish baseline ECD's ECD = 10.23 PROD1 Directional drill from 7075' to 7358', sliding as required to build angle and azimuth. 18:00 - 18:30 0.50 STKOH C WOB = 5-15 klbs RPM = 60 GPM = 280 @ 2900 psi on Btm, 2680 psi off Btm PROD1 POH from 7358' to 7130' for geologic plug back. 18:30 - 21 :00 2.50 STKOH C Well landed for horizontal section 6' TVD high to plan. Estimated formation dip in prognosis -2 degrees, actual formation dip <1 degree. The combination of these would have resulted in the loss of the entire lower OBd sand. Town engineering and geology staff were consulted and the decision was made to open hole sidetrack at 7130'. PROD1 Trench for sidetrack at 150 degrees right. Trench and drill from 7130' to 7358'. PROD1 Directional drill from 7358' to 7555', sliding as required to build angle and azimuth. 21 :00 - 00:00 3.00 DRILL P WOB = 5-15 klbs RPM = 65 Torque off Btm = 4.4k FtLb, Torque on Btm = 5.5k FtLb GPM = 280 @ 2750 psi on Btm, 2430 psi off Btm P/U 135k S/O 82k ROT 104k P/U 135k S/O 90k No pumps Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.22 ppg, Actual ECD = 10.77 ppg 3/28/2004 00:00 - 11:00 11.00 DRILL P AST = 1.63 hrs. ART = 1.57 hrs. PROD1 Directional drill from 7555' to 8280', sliding as required to maintain angle and azimuth. WOB = 8-15 klbs RPM = 65 Torque off Btm = 5.4k FtLb, Torque on Btm = 6.5k FtLb GPM = 280 @ 3100 psi on Btm, 2564 psi off Btm P/U 134k S/O 83k ROT 108k P/U 143k S/O 92k No pumps Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Printed: 51312004 8:46:01 AM BP EXPLORATION ··P.peratiolls s (JrtÚli~ryReport Page 10 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From.,.Tö Hours Task Code NPT Phase Description of Operations 3/28/2004 00:00 - 11 :00 11.00 DRILL P PROD1 Calculated ECD = 10.55 ppg, Actual ECD = 11.13 ppg 11 :00 - 11 :30 0.50 DRILL P PROD1 Service #2 mud pump, loose cable on traction motor 11 :30 - 14:30 3.00 DRILL P PROD1 Directional drill from 8280' to 9093', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque oft Btm = 5.9k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 2950 psi on Btm, 2510 psi off Btm P/U 141k S/O 79k ROT 107k P/U 150k S/O 88k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.61 ppg, Actual ECD = 10.90 ppg 14:30 - 15:30 1.00 DRILL P PROD1 Circulate and condition while correlating geologic data. 280 gpm @ 2510 psi and 70 rpm 15:30 - 21 :30 6.00 DRILL P PROD1 Directional drill from 9093' to 9870', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 6.5k FtLb, Torque on Btm = 7.7k FtLb GPM = 280 @ 3150 psi on Btm, 2614 psi off Btm P/U 148k S/O 69k ROT 107k P/U 157k S/O 80k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.66 ppg, Actual ECD = 11.24 ppg AST = 3.03 hrs. ART = 4.92 hrs. 21 :30 - 00:00 2.50 DRILL P PROD1 Condition hole for wiper trip to 7-5/8" csg shoe. Circulate BU volume X 2. Pump 10 bbl base oil sweep surface to surface. Circulate until ECD within 0.3 ppg of calculated. 296 gpm @ 2830 psi and 70 rpm Calculated ECD = 10.37 ECD prior to wiper trip = 10.56 3/29/2004 00:00 - 01 :30 1.50 DRILL P PROD1 Monitor well - static. POH on wiper trip to 7-5/8" csg shoe. No problems 01 :30 - 17:00 15.50 DRILL N RREP PROD1 PJSM with all rig personnel. Change out top drive wash pipe and upper rotary seals. 17:00 - 17:30 0.50 DRILL P PROD 1 Service top drive and blocks 17:30 - 19:30 2.00 DRILL P PROD1 RIH, work through tight spots at 8575' and 9230'. Wash last stand to bottom at 9870' 19:30 - 20:00 0.50 DRILL P PROD1 Stage pumps to drilling rate, 280 gpm @ , and CBU Printed: 5/312004 8:46:01 AM ) ) BP EXPLORATION Op,erations SUI1.1.m.,·'ary,FJeport , ' . Page 11 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To, Hours . Task Code NPT Phase Description of Operations ' 3/2912004 20:00 - 00:00 4.00 DRILL P PROD1 Directional drill from 9870' to 10057', sliding as required to maintain angle and azimuth. WOS = 8-12 klbs RPM = 70 Torque off Stm = 6.6k FtLb, Torque on Stm = 7.5k FtLb GPM = 280 @ 3160 psi on Stm, 2660 psi off Stm P/U 146k 8/0 80k ROT 107k P/U 156k SIO 84k No pumps Sackream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.49 ppg, Actual ECD = 11.04 ppg A8T = 0.56 hrs. ART = 0.34 hrs. 3/30/2004 00:00 - 10:00 10.00 DRILL P PROD1 Drill 6-3/4" directional hole from 10057' to 11364', sliding as required to maintain angle and azimuth. WOS = 10-12 klbs RPM = 75 Torque off Stm = 7.9k FtLb, Torque on Stm = 9.0k FtLb GPM = 280 @ 3600 psi on Stm with 500 psi differential pressure P/U 154k SIO 62k ROT 100k Sackream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.72 ppg Actual ECD = 11.7 ppg 10:00 - 10:30 0.50 DRILL P PROD1 Circulate to reduce ECD. Riciprocate & rotate (75 rpm) drill string wihile circulating with 280 gpm @ 3050 psi. ECD after Circulating = 11.32 ppg 10:30 - 12:30 2.00 DRILL P PROD1 Drill 6-3/4" directional hole from 11364' to 11642', sliding as required to maintain angle and azimuth. was = 10-12 klbs RPM = 75 Torque off Stm = 7.9k FtLb, Torque on Stm = 9.0k FtLb GPM = 280 @ 3600 psi on Stm with 500 psi differential pressure P/U 154k S/O 62k ROT 100k Sackream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.72 ppg Actual ECD = 11.82 ppg 12:30 - 14:00 1.50 DRILL P PROD1 Circulate @ 11642' while evaluating geological well data. 14:00 - 16:00 2.00 DRILL P PROD1 Drill 6-314" directional hole from 11642' to 11831 I, sliding as required to maintain angle and azimuth. was = 10-12 klbs Printed: 5/312004 8:46:01 AM BP EXPLORATION Operations SurnmaryR~p()rt Drilling Time last 24 Hrs= 5.68 hrs ART = 3.12 Hrs AST = 2.56 Hrs. Survey & Connection time = 8.82 Hrs DFAL PROD1 Circulate while trouble shooting problem with MWD-GR tool. Backream up one stand to correlate MWD data. Gamma Counts prior to having problem was reading 80 CPS. Currently reading 10 CPS. Unable to rectify MWD-GR tool problem. Failure unknown at this time. Circulated 2 x bottoms-up from 11856' @ 280 gpm with 2880 psi. Calculated ECD =10.85 ppg Actual ECD after circulating = 11.06 ppg DFAL PROD1 POOH (Due to MWD tool failure) to 7-5/8" casing shoe with no problems. Hole in good condition. Flow check @ shoe. Well Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date From - To Hours .'-a~* Code NPT Phase 3/30/2004 14:00 - 16:00 2.00 DRILL P PROD1 16:00 - 19:00 3.00 DRILL P PROD1 19:00 - 20:00 1.00 DRILL P PROD1 20:00 - 21 :30 1.50 DRILL P PROD1 21 :30 - 22:00 0.50 DRILL P PROD1 22:00 - 00:00 2.00 DRILL N 3/31/2004 00:00 - 02:30 2.50 DRILL N Page 12 of34 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 D~êçripti()nof<J:}pøtct!ip [1S RPM = 75 Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3290 psi on Btm with 280 psi differential pressure P/U 151k S/O 60k ROT 104k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg Circulate & condition mud/hole for wiper trip. Circulate until ECD within 0.3 ppg of calculated. 280 gpm @ 2890 psi and 75 rpm Calculated ECD = 10.78 ppg ECD prior to wiper trip = 11.08 POOH for wiper trip from 11831' to 9590' (24 Stds) with no problems. Hole in good condition. Max drag 15k. TIH to 11736' with no problems. M/U TDS. Establish circulation. Precautionary wash & ream to bottom with no problems. No fill on bottom. Drill 6-3/4· directional hole from 11831' to 11856', sliding as required to maintain angle and azimuth. Had a fair amount of drill cuttings come over shakers on bottoms up from wiper trip. Note: Gamma-Ray tool generating incorrect data. WOB = 10-12 klbs RPM = 75 Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3290 psi on Btm with 280 psi differential pressure P/U 151k S/O 60k ROT 104k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg Printed: 5/312004 8:46:01 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 " Date From - To ' Hours Task Code, ,NPT Phase, Description of Operations, ' 3/31/2004 00:00 - 02:30 2.50 DRilL N DFAL PROD1 static. 02:30 - 05:00 2.50 DRILL N DFAL PROD1 Continue POOH with drill string to top of BHA. 05:00 - 05:15 0.25 DRILL N DFAL PROD1 SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. 05:15 - 07:00 1.75 DRILL N DFAL PROD1 Stand back Jars & NMDC's. Unload RA Source from lWD. UD MWD-LWD tool. Check mud-motor & bit (Bit in like new condition). Down-load MWD. 07:00 - 07:30 0.50 DRILL N DFAL PROD1 Clean Rig Floor. 07:30 - 07:45 0.25 DRILL N DFAL PROD1 SAFETY --- Held PJSM with Anadrill and all Rig personnel regarding picking up BHA & loading RA source. 07:45 - 09:30 1.75 DRILL N DFAL PROD1 M/U 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK. 09:30 -12:00 2.50 DRILL N DFAL PROD1 TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7032'. 12:00 - 13:00 1.00 DRILL N DFAL PROD1 Service TDS. Slip & cut 78' of Drill Line. Reset & check C-O-M. Check brake system. 13:00 - 15:00 2.00 DRILL N DFAL PROD1 Continue TIH to 11600' with no problems. 15:00 - 16:00 1.00 DRILL N DFAL PROD1 MIU TDS. Establish circulation. Stage pumps to 280 gpm with 2520 psi + 70 rpm. Perform MADD PASS from 11600'-11856'. 16:00 - 21 :00 5.00 DRILL P PROD1 Drill 6-3/4" directional hole from 11856' to 12327', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 75 Torque off Btm = 8.0k FtLb, Torque on Btm = 10k FtLb GPM = 280 @ 3480 psi on Btm with 200 psi differential pressure P/U 155k S/O 59k ROT 103k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.90 ppg Actual ECD = 11.39 ppg Drilling Time last 24 Hrs= 2.15 hrs ART = 1.08 Hrs AST = 1.07 Hrs. Survey & Connection time = 2.85 Hrs 21 :00 - 23:30 2.50 DRILL C PROD1 Circulate @ 12327' while evaluating geological well data. Note: Due to a unaccceptable amount of pay zone drilled, a decision was made by the BP Drilling department to perform a Open Hole sidetrack at 10585' MD. Circulate hole clean (2 x Btm-up vol) with 280 gpm @ 2870 psi. Reciprocate & rotate drill string (75 RPM) while circulating. ECD after circulating: Calculated ECD = 10.90 Actual ECD = 11.20. P/U 155k SIO 59k Rot Wt 1 03k 23:30 - 00:00 0.50 DRILL C PROD1 Flow check. Well static. Blow down TDS. POOH for Open-hole Sidetrack from 12327' to 11453'-midnight depth. Hole in good shape. Max drag 15k. 4/1/2004 00:00 - 00:30 0.50 DRILL C PROD1 POOH from 11453' to 10565' for Open-hole Sidetrack. Hole in good shape. Max drag 15k. 00:30 - 01 :30 1.00 STKOH C PROD1 Break circulation. Stage pumps to 280 gpm wi 2730 psi. Orient TF to 140 deg LHS for Open Hole Sidetrack. Start trenching from 10565' to 10585'. NOTE: AIM tool quit working. 01:30 - 02:30 1.00 STKOH X DFAL PROD1 Circulate & work drill string @ 10585' while trouble shooting problem with AIM Tool. Unable to rectify problem. Printed: 5/312004 8:46:01 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: l-201 l-201 DRlll+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES FrQm"To . HoUrs :T:J(a.$k Cöde:NPT Phase 4/1/2004 02:30 - 04:00 1.50 STKOH X DFAL PROD1 04:00 - 06:30 2.50 STKOH X DFAL PROD1 06:30 - 06:45 0.25 STKOH X DFAL PROD1 06:45 - 09:00 2.25 STKOH X DFAL PROD1 09:00 - 14:00 5.00 BOPSUF X DFAL PROD1 14:00 - 14:15 0.25 STKOH X DFAL PROD1 14:15 - 15:30 1.25 STKOH X DFAL PROD1 15:30 - 18:00 2.50 STKOH X DFAL PROD1 18:00 - 19:30 1.50 STKOH X DFAL PROD1 19:30 - 21 :00 1.50 STKOH X DFAL PROD1 21 :00 - 21 :30 0.50 STKOH X DFAL PROD1 21 :30 - 00:00 2.50 DRILL C PROD1 4/2/2004 00:00 - 14:25 14.42 STKOH C PROD1 Page 140f 34 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Descri ptio flc>f()pe r(itioDs POOH from 10585' to 7-5/8" Casing Shoe @ 7047' with no problems. Hole in good condition. Flow check @ shoe. Well static. Continue POOH from 7047' to top of BHA. SAFETY --- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Stand back Jars & NMDC's. Remove RA Source. UD MWD-LWD tool, mud-motor & bit (Bit in good condition). Held PJSM. Pull wear bushing. Run BOP Test Plug on 4" DP. Rig Up Testing Equipment - Test BOP & Related Surface Equipment: Test Annular, Upper And Lower Pipe Rams, Blind Rams, Manual & HCR Valves on C/K Lines, Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. Perform Accumulator Test. Blow down lines. Rig Down testing Equipment The BOP Test witnessed By AOGCC Inspector John Crisp. SAFETY--- Held PJSM with Anadrill and all Rig personnel regarding picking up BHA & loading RA source. M/U 6-3/4" Steerable Drilling assembly (BHA #6). Shallow test MWD-OK. TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7-5/8" Casing Shoe @ 7047'. Service TDS. Slip & cut 37' of Drill Line. Reset & check C-O-M. Check brake system. Continue TIH to 10522' with no problems. M/U TDS. Establish circulation. Stage pumps to 280 gpm with 2820 psi. Wash down to 10565'. Orient TF to 140 deg LHS for Open Hole Sidetrack 02. Trench from 10565' to 10585'. Sidetrack well & Drill 6-3/4" directional hole from 10585' to 10615', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 2820 psi on Btm with 100 psi differential pressure P/U 153k S/O 83k ROT 105k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.00 ppg Actual ECD = 10.96 ppg Drilling Time last 24 Hrs= 1.79 hrs ART = 0.60 Hrs AST = 1.19 Hrs. Survey & Connection time = 0.71 Hrs Drill 6-3/4" directional hole from 10615' to 12327', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 7.9k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3500 psi on Btm with 250 psi differential pressure Printed: 5/312004 8:46:01 AM ) ) ··I3ªgª.~1.q...ºf···$1: Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 From - To Hours Task Code' NPT Phase., Description of Operation~ 4/212004 00:00 - 14:25 14.42 STKOH C PROD1 P/U 150k SIO 52k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D', 17:45 - 19:00 1.25 DRILL P Calculated ECD = 10.90 ppg Actual ECD = 11.85 ppg PROD1 Drill ahead in 6 3/4" hole from 12327' to 12732' MD (original depth). Drilling parameters as above. PROD1 Circulate to reduce ECD. Reciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3230 psi. ECD after Circulating = 11.32 ppg PROD1 Drill 6-3/4" directional hole from 12732' to 12800', sliding as required to maintain angle and azimuth. 14:25 - 17:45 3.33 STKOH C 19:00 - 19:30 0.50 DRILL P 19:30 - 20:00 0.50 DRILL P Calculated ECD = 10.93 ppg Actual ECD = 11.72 ppg PROD1 Circulate @ 12800' to reduce ECD. Riciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3230 psi. ECD after Circulating = 11.30 ppg PROD1 Drill 6·3/4" directional hole from 12800' to 13073', sliding as required to maintain angle and azimuth. WOB = 10-18 klbs RPM = 70 Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 3500 psi on Btm with 250-300 psi differential pressure P/U 150k S/O 52k ROT 103k 20:00 - 00:00 4.00 DRILL P Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 11.26 ppg Actual ECD = 11.77 ppg 4/3/2004 00:00 - 05:00 5.00 DRILL P On Bottom Drilling Time last 24 Hrs= 10.73 hrs ART = 5.29 Hrs AST = 4.81 Hrs. Survey & Connection time = 11.52 Hrs PROD1 Drill 6-3/4" directional hole from 13073' to 13580'. Sliding as required to maintain angle and azimuth. WOB = 5-15 klbs RPM = 70 Torque off Btm = 8.2k FtLb, Torque on Btm = 10-11k FtLb GPM = 280 @ 3520 psi on Btm with 250-300 psi differential pressure P/U 156k S/O 56k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 06:00 - 07:00 1.00 DRILL P Calculated ECD = 10.90 ppg Actual ECD = 11.64 ppg PROD1 Circulate to reduce ECD. Riciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3140 psi. ECD after Circulating = 11.15 ppg PROD1 DriIlS-3I4" directional hole from 13580' to 13698' TD. Sliding as required to maintain angle and azimuth. 05:00 - 06:00 1.00 DRILL P Printed: 51312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Pag~J6pf.34 BP EXPLORATION Operation~sum'lJ1åry~â~p()rt L-201 L -201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 D~t~·, FrOm-To Hours· Task Code NPT 4/3/2004 06:00 - 07:00 1.00 DRILL P PROD1 Description of QpE3Jªtiops 07:00 - 12:00 12:00 - 15:30 15:30 - 16:30 16:30 - 19:30 19:30 - 23:00 5.00 DRILL P PROD1 3.50 DRILL P PROD1 1.00 DRILL P 3.00 DRILL P 3.50 DRILL P PROD1 PROD1 PROD1 23:00 - 00:00 1.00 DRILL P PROD1 4/4/2004 00:00 - 04:30 4.50 DRILL P PROD1 04:30 - 05:30 1.00 DRILL P PROD1 05:30 - 08:30 3.00 DRILL P PROD1 08:30 - 08:45 0.25 DRILL P PROD1 08:45 - 10:30 1.75 DRILL P PROD1 10:30 - 11 :00 0.50 DRILL P PROD1 11 :00 - 11 :30 0.50 CASE P CaMP WOB = 5-15 klbs RPM = 70 Torque off Btm = 8k FtLb, Torque on Btm = 11 k FtLb GPM = 280 @ 3500 psi on Btm with 250-300 psi differential pressure P/U 150k S/O 52k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.90 ppg Actual ECD = 11.40 ppg On Bottom Drilling Time = 2.27 hrs ART = 1.8 Hrs AST = 0.47 Hrs. Survey & Connection time = 3.73 Hrs Circulate & condition mud/hole from 13698'. Increase pump rate to 300 gpm with 3425 psi. Pump 25 bbl Lo-Vis sweep. Circulate hole clean (4.5 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Pump slug. Calculated ECD = 10.88 ppg ECD prior to Wiper Trip = 11.09 ppg POOH (Wiper Trip) to 7-5/8" Casing Shoe @ 7047'. Had one tight spot @ 11880'. Max over-pull = 35k. Worked through same with no other problems. Hole in good condition. Average drag 10-15k P/U 170k S/O 63k Off bottom with no pump. Service TDS. TIH with drill string to 13602' with no problems. M/U TDS. Establish circulation. Precautionary wash & ream to bottom @ 13698' with no problems. Circulate & condition mud/hole from 13698'. Increase pump rate to 300 gpm with 3350 psi. Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Calculated ECD = 10.96 ppg ECD prior to Wiper Trip = 11.09 ppg Flow check. Well static. Pump slug. POOH to run 4.5" Slotted Production Liner. P/U 160k S/O 75k Off bottom with no pump. POOH from 13231' to 7000' (7-5/8" Shoe @ 7047') with no problems. Hole in good condition. Max Drag 5-10k. Drop Circ-Sub opening dart. Break circulation. pump dart on seat. Open eire-sub (Placed @ 175' above bit) with 1800 psi. Stage pumps to 575 gpm with 3380 psi. Reciprocate & rotate (70 RPM) while circulating from 6825'. No drilling cuttings observed from Btms-up. Flow check. Well static. Pump slug. Continue POOH from 7000' to top of BHA. SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Remove RA Source. UD Anadrill Directional tools. Clean Rig Floor. RlU 4.5" Casing tongs & Liner Running equipment. Printed: 5/312004 8:46:01 AM ) ) , "."'BP,I;~~b~BATIQN ., Operation,s S.u,rnrnary Report COMP SAFETY --- Held PJSM with rig crew & BOT personnel regarding running liner & P/U Liner Hanger-Packer assembly. CaMP M/U 4-1/2" Guide Shoe Jt + 159 Jts of 4-1/2" 12.6# L-80 IBT-M slotted liner + 14 Jts of 4.5" 12.6# L-80 IBT-M solid liner & BOT "Flex-Lock" Liner Hanger wi ZXP Liner Top Packer. Total length = 7240.49' Liner String wt = 55k. COMP RIH with 4-1/2" 12.6# Slotted liner assembly on 4" DP to 13680' with no problems. P/U & place 4.S" Liner Shoe @ 13672' . P/U 165k SIO 69k CaMP Drop 29/32" setting ball down DP. Pump on seat @ 4 bpm wi 600 psi. Once ball seated increased pressure to 2000 psi to set "Flex-Lock" Liner Hanger. SIO 35k on Hanger. Continue pressuring up to 3000 psi to set ZXP Packer. Pressure up to 4000 psi. Ball seat did not shear. P/U 12' above TBR & release packer setting dogs. Set 50k on ZXP packer to ensure proper setting. The 4.5" Slotted Liner Shoe set @ 13672' with top of liner @ 6432'. P/U on string placing end of DP @ 6358'. CBU @ 7 bpm wi 1520 psi. Flow check. Pump slug. POOH from 6358' with 4" DP. Finish POOH from 4700' with 4" DP. UD BOT Liner Hanger Running Tool. Clear & clean Rig Floor. Slip & cut 93' of drill line. Reset & check C-O-M. Adjust brakes. Service TDS. SAFETY ---- Held PJSM with Rig Crew, Baker Oil Tools Rep & Anadrill personnel regarding P/U Whipstock + BHA. M/U L 1 (OBb) Whipstock assembly. Orient with MWD. P/U 9 x 4-3/4" DC. RIH with 4" HWDP. POOH from 1100' to change Whipstock spaceout. UD 1 Jt of 3.5" HWDP & Flex Jt. MIU Whipstock. Reorient with MWD. Shollow test MWD-OK. TIH with L 1 Whipstock assembly on 4" DP to 6398' (End of seals on Spaceout assembly). M/U TDS. Estabish circulation. Orient whipstock 1S deg lHS. Stab dummy seal assembly into Top of tie-back sleeve (11' sleeve) @ 6432'. Set down 20k to set whipstock anchor. P/U 10k over to verify anchor set. Set down 40k to shear whipstock lug. WEXIT Attempt to pressure test 7-S/8" casing to 1000 psi-Bleeding off. Check all surface equipment. Found no surface leaks. Attempted to test several times. Pressure bled off to 700 psi & holding. Consult with ODE. Consensus was to continue as per program. WEXIT Mill Window in 7-S/8" casing from 6372 to 6384' and drill 14' of new hole to 6398'. Work mills through window with no problems. NOTE: Window cut in 7-5/8" csg F/6372' to 6384' WOB = 2-12k RPM = 70-114 Torque = 6500 KFtLb GPM = 2S0 @ 1500 psi Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Dà,fê .. Ft<:>rTl,~TÖ Hours ,",':,',"". Task 'Cöde NPT Phase 4/4/2004 11 :30 - 12:00 0.50 CASE P 12:00 - 18:00 6.00 CASE P 18:00 - 21 :00 3.00 CASE P 21 :00 - 22:00 1.00 CASE P 22:00 - 23:00 1.00 CASE P COMP 23:00 - 00:00 1.00 CASE P CaMP 4/5/2004 00:00 - 02:30 2.50 CASE P COMP 02:30 - 04:00 1.50 CASE P CaMP 04:00 - 04:15 0.25 STWHIP P WEXIT 04:15 - 07:00 2.7S STWHIP P WEXIT 07:00 - 12:00 5.00 STWHIP N HMAN WEXIT 12:00 - 14:30 2.50 STWHIP P WEXIT 14:30 - 15:00 0.50 STWHIP P WEXIT 15:00 - 16:00 1.00 STWHIP P 16:00 - 20:00 4.00 STWHIP P Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 "', .;' :.-,.; ,:'::.;,::.;"";,.:::,:,;,':,,.:::', Description 'of OperatiOns> . Printed: 51312004 8:46:01 AM Page 18 oL34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Daté Fróm- TQ' Hours Task Code NPT Phasß .. [)escription·9f()p~JéHíons 4/5/2004 16:00 - 20:00 4.00 STWHIP P WEXIT P/U 129k SIO 92k Rotate Wt = 101 k 20:00 - 21 :00 1.00 STWHIP P WEXIT Pump Hi-vis sweep & circulate hole clean from 6398' wi 290 gpm @ 1800 psi. Reciprocate & rotate drill string (110 RPM) while circulating. 21 :00 - 21 :30 0.50 STWHIP P WEXIT Perform FIT. Pressure up on formation to 665 psi with 9.2 ppg MOBM @ 4562' TVD = 12.0 ppg EMW. Flow check. Well static. Pump slug. Blow down TDS & related equipment. 21 :30 - 00:00 2.50 STWHIP P WEXIT POOH with Mill Assy & 4" DP to top of BHA. 4/6/2004 00:00 - 01 :30 1.50 STWHI P P WEXIT UD 9 x 4-3/4" DC, BOT mills & related equipment. Clear rig floor of excess whipstock milling equipment. 01 :30 - 02:30 1.00 STWHIP P WEXIT M/U ported sub. Flush out BOP's. UD sub. Blow down TDS, C/K Lines & all Surface equipment in preparation for BOP Test. Pull wearbushing. 02:30 - 06:30 4.00 BOPSUF P WEXIT Held PJSM. RIH with BOP Test Plug on 4" DP & seat in wellhead. Rig Up Testing Equipment - Test BOP & Related Surface Equipment: Test Annular, Upper And Lower Pipe Rams, Blind Rams, Manual & HCR Valves on C/K Lines, Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. RID Test Equipment. Pull test plug. Install wearbushing. Blow down surface lines. Witness Of BOP Test Waived By AOGCC Inspector John Spaulding. 06:30 - 07:00 0.50 DRILL P WEXIT SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding picking up BHA tools & installing RA Source. 07:00 - 09:00 2.00 DRILL P WEXIT M/U (L 1, OBb) 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK. 09:00 - 12:00 3.00 DRILL P WEXIT TIH with 6-3/4" Drilling assembly on 4" DP to 6350'. 12:00 - 12:30 0.50 DRILL P WEXIT M/U TDS. Establish circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. RIH (L 1 lateral) to 6388' without any problems. Establish baseline ECD of 10.49 ppg @ 280 gpm + 70 rpm. Wash & ream from 6388' to 6398'. 12:30 - 00:00 11.50 DRILL P PROD2 Drill 6-3/4" directional hole from 6398' to 7638'. Sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 4.5k FtLb, Torque on Btm = 7.0k FtLb GPM = 280 @ 2750 psi on Btm with 300-375 psi differential pressure P/U 125k SIO 80k Rot Wt 95k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.40 ppg Actual ECD = 10.9 ppg On Bottom Drilling Time last 24 Hrs= 7.42 hrs ART = 4.52 Hrs AST = 2.9 Hrs. Survey & Connection time = 4.08 Hrs 4(112004 00:00 - 15:00 15.00 DRILL P PROD2 Drill 6-3/4" directional hole from 7638' to 9559'. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs Printed: 5/312004 8:46:01 AM ) ') EXPLORATION Operations Summary Repo~t Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours Task Code NPT Phase Description of: Operations ' 4/7/2004 00:00 - 15:00 15.00 DRILL P PROD2 RPM = 65 Torque off Btm = 5.5k FtLb, Torque on Btm = 8.0k FtLb GPM = 280 @ 3100 psi on Btm with 300-375 psi differential pressure P/U 141k SIO 72k Rot Wt 103k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.72 ppg Actual ECD = 11.23 ppg 15:00 - 18:30 3.50 DRILL P PROD2 Circulate & condition mudlhole prior to wiper trip from 9559'. Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (75 rpm) while circulating. Flow check. Well static. Pump slug. Calculated ECD = 10.76 ppg ECD prior to Wiper Trip = 10.86 ppg 18:30 - 20:00 1.50 DRILL P PROD2 Wiper trip. POOH to 6368' (7-5/8" window @ 6372'-6384') with no problems. Max drag 25k. Average drag 10-15k. 20:00 - 21 :30 1.50 DRILL P PROD2 Service TDS. Change out Actuator on Lower IBOP valve. 21 :30 - 23:00 1.50 DRILL P PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. TIH (L 1 lateral) to 9466' with no problems. M/U TDS. Precautionary wash & ream to bottom. No fill. Pump 20 bbl Lo-vis sweep. 23:00 - 00:00 1.00 DRILL P PROD2 Drill 6-3/4" directional hole from 9559' to 9589'. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 5k FtLb, Torque on Btm = 7.5k FtLb GPM = 280 @ 3100 psi on Btm with 300-375 psi differential pressure P/U 140k S/O 72k Rot Wt 103k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 3D'. Calculated ECD = 10.76 ppg Actual ECD = 11.23 ppg On Bottom Drilling Time last 24 Hrs= 5.88 hrs ART = 3.63 Hrs AST = 2.25 Hrs. Survey & Connection time = 10.12 Hrs 4/8/2004 00:00 - 22:00 22.00 DRILL P PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 9589' to 12172'. Sliding as required to maintain inclination and azimuth. **** NOTE: Drilled out the top of the OBb Zone **** WOB = 10-15 klbs RPM = 65 Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3350 psi on Btm with 300-400 psi differential pressure P/U 149k S/O 62k Rot Wt 97k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Printed: 51312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date BPEXPLORATION Qperations Summa~y Report page.20.ôf.34 L -201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 4/812004 00:00 - 22:00 From"'To Hours Task Code NPT Phase PROD2 Descriptionof Op~~ßtiøf)§ 22.00 DRILL P Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg On Bottom Drilling Time last 24 Hrs= 7.94 hrs ART = 4.9 Hrs AST = 3.04 Hrs. Survey & Connection time = 14.06 Hrs POOH (2 Stds) to 11933' for Geological Sidetrack after exiting the top of the OBb sand. Break circulation. Stage pumps to 280 gpm wI 2800 psi. Orient TF to 135 deg RHS for Open Hole Sidetrack. Start trenching from 11933' to 11953'. Perform open hole sidetrack in the L 1 (OBb) lateral. Time drill from 11953' to 11963'. 22:00 - 22: 15 0.25 STKOH C PROD2 22:15 - 00:00 1.75 STKOH C PROD2 4/9/2004 00:00 - 02:00 2.00 STKOH C PROD2 02:00 - 05:30 05:30 - 19:45 19:45 - 23:00 3.50 STKOH C WOB = 0-2k GPM = 280 @ 2800 psi P/U 149k S/O 62k Rot Wt 97k PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 11963' to 12172' (original depth). Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3350 psi on Btm with 300-400 psi differential pressure P/U 149k. S/O 62k. Rot Wt 97k. Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 14.25 DRILL P Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg PROD2 Continue drilling 6-3/4" L 1 lateral from 12172' to 13540' TD I 4565' TVD. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 8k FtLb, Torque on Btm = 9-12k FtLb GPM = 280 @ 3300 psi on Btm with 300-350 psi differential pressure P/U 161 k SIO 48k Rot Wt 100k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 11.05 ppg Actual ECD = 11.55 ppg 3.25 DRILL P On Bottom Drilling Time last 24 Hrs= 7.7 hrs ART = 3.7 Hrs AST = 4.0 Hrs. Survey & Connection time = 12.30 Hrs PROD2 Circulate & condition mud/hole prior to wiper trip from 13540'. Circulate hole clean (3 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Printed: 51312004 8:46:01 AM ) ) ,.:. :, ::!<¡¡}:".;,:!:.:·..S8,:~?<8:t9Bt\*IQN.;·'..:'··....'. ","". jº:P~b~!~:gg:~.:;s:Ú:mJ)l~irY:R~PQrt ,"'," ,':';:,,': . :':, :.','.'';' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours Task Code NPT Phase Description of Operations 4/912004 19:45 - 23:00 3.25 DRILL P PROD2 Calculated ECD = 10.96 ppg ECD prior to Wiper Trip = 11.01 ppg 23:00 - 00:00 1.00 DRILL P PROD2 Wiper trip. POOH to 12606' with no problems. Max drag 20k. Average drag 10-15k. P/U Off Btm no pump = 175k S/O 60k. 4/10/2004 00:00 - 02:30 2.50 DRILL P PROD2 Continue wiper trip. POOH from 12606' to 6368' (7-5/8" window @ 6372'-6384') with no problems. Max drag 25k @ 10679'. Average drag 10-15k. 02:30 - 04:00 1.50 DRILL P PROD2 Slip & cut 71' of drill line. Reset & check C-O-M. Check Drawworks brakes. Service TDS. 04:00 - 08:00 4.00 DRILL P PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. TIH to 13475'. Encountered tight hole from 10730' to 10965' & at 11830' with 25k down drag. Work through same with no other problems. 08:00 - 13:45 5.75 DRilL P PROD2 M/U TDS. Establish circulation. Precautionary wash & ream to bottom @ 13540' with no problems. Circulate & condition mud/hole with 280 gpm @ 3070 psi. Circulate hole clean with 5.3 x Btms-up. Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Pump slug. Calculated ECD = 11.01 ppg Actual ECD = 11.44 ppg ECD prior to Trip = 11.01 ppg 13:45 - 17:30 3.75 DRILL P PROD2 POOH from 13540' to 6559' with no problems. Place Circ-Sub at bottom of whipstock. Hole in good condition. Average Drag 5-15k. P/U 172k S/O 60k off bottom with no pump. 17:30 - 18:00 0.50 DRilL P PROD2 Drop Circ-Sub opening dart. Break circulation, pump dart on seat. Shear eire-sub with 2180 psi (Placed @ 175' above bit). Stage pumps to 200 gpm with 500 psi. P/U on drill string washing by window & across whipstock face. Pull bit inside 7-5/8" casing to 6364'. 18:00 - 19:00 1.00 DRILL P PROD2 Pump Lo-vis sweep. Circulate hole clean from 6189' with 450 gpm @ 2020 psi. Reciprocate & rotate (65 RPM) while circulating. No drill cuttings observed from Btms-up. Flow check. Well static. Pump slug. 19:00 - 21 :30 2.50 DRILL P PROD2 Continue POOH with drill string to top of BHA. 21 :30 - 21 :45 0.25 DRILL P PROD2 SAFETY m Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. 21 :45 - 23:30 1.75 DRILL P PROD2 Remove RA Source. UD all Anadrill Directional tools & bit. 23:30 - 00:00 0.50 DRILL P PROD2 Clear & clean rig floor. 4/11/2004 00:00 - 00:15 0.25 STWHIP P PROD2 SAFETY --- Held PJSM with rig crew, Anadrill & Baker personnel regarding M/U Whipstock retrieving tool (WSRT) & BHA. 00:15 - 01 :30 1.25 STWHIP P PROD2 MIU WSRT & BHA which consists of the following: Whipstock Hook retrieving tool + 1 Jt of 3.5" HWDP + FS + MWD + Bumper-Sub + Oil Jar + 12 x 4-3/4" DC + XO + 24 x 4" HWDP = 1199.63'. Shallow test MWD-OK. 01 :30 - 03:30 2.00 STWHIP P PROD2 TIH with WSRT BHA on 4" DP to 6328'. 03:30 - 04:00 0.50 STWHIP P PROD2 M/U TDS. Break circulation. Stage pumps to 244 gpm w/1330 psi. Orient WSRT to 15 deg LHS. (P/U Wt 132k S/O Wt 90k). Slack off on drill string to 6378'. P/U & engage whipstock. Pull on whipstock with 60k overpull. no release. Jar on whipstock 3 additional times with 65k over pull & release Printed: 5/312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: BP EXPLC>HATION . , ,'.,' ." " ,"'" '-'''',' ", :..~ '" "', : :', .. '-,.:':; Opç~ªti.pn.~....Sg,rtOTI.ªtY.frgp()rt Page 22 of 34 L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 4/11/2004 03:30 - 04:00 From,,:,Tp Hours Task €odeNPT Description ofOperati0r1~ Date 04:00 - 05:00 05:00 - 07:30 07:30 - 11 :00 11 :00 - 12:00 12:00 - 12:15 12: 15 - 19:30 0.50 STWHIP P PROD2 1.00 STWHIP P PROD2 2.50 STWHIP P 3.50 STWHIP P PROD2 PROD2 1.00 CASE P 0.25 CASE P COMP CaMP 7.25 CASE P COMP 19:30 - 20:00 0.50 CASE P COMP 20:00 - 00:00 4.00 CASE P COMP 4/12/2004 00:00 - 01 :00 1.00 CASE P CaMP 01 :00 - 02:00 02:00 - 02:30 02:30 - 03:30 1.00 CASE P COMP 0.50 CASE P COMP 1.00 CASE P COMP whipstock. P/U & pull seals out of bottom tie-back receptacle. Pull whipstock up to 6358' (P/U Wt = 138k). Monitor well 5 minutes. Annulus level fell +1- 20'. CBU from 6358' with 200 gpm @ 875 psi. Lost 12 bbl mud at start of circulating. Lost another 2 bbl mud while circulating Btms-up. Flow check. Fluid level dropping very very slow. Pump slug. POOH with whipstock assembly #1 to top of BHA. Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock retrieving tool, L 1 Whipstock & 3.5" DP space-out assembly. 100% recovery of all Whipstock & downhole tools. Clear & clean rig floor. Rig up 4.5" Liner running equipment. SAFETY--- Held PJSM with rig crew & BOT personnel regarding running liner & P/U Hook Hanger assembly. M/U 4-1/2" Float Shoe (Bent) Jt + 155 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner'. Continue TIH. Tag up on the "Mother Bore" liner top packer @ 6432'. POOH to 6378' which is mid-point of window. Apply one round of RHT in string. Slack off & exit 7-5/8" window into open hole with no other problems. Continue running 15 additional Jts of 4.5" slotted liner (170 Jts Slotted) + 1 Jt of solid liner + XO Pup Jt & BOT Flanged Hook Hanger assembly. Total length = 7138.16' P/U Wt = 98k S/O Wt = 70k Theoretical Liner Wt in mud = 77,500 Lbs Change elevators to fit 4" DP. RID Hydraulic Casing Tongs & related equipment. Continue RIH with 4-1/2" slotted liner on 50 Stds of 4" DP to 11809'. P/U 148k SIO 55k Continue RIH with 4.5" Slotted Production liner from 11809'. Tag-up solid @ 13163'. Note: Had 50 Stds of 4" DP + 8 stds 4" HWDP + 4 stds 4-3/4" DC's + 2 stds & double of 4" DP . Work string 60' up & down four times. Stacking out all available weight with string stopping @ 13163' each time. M/U TDS. Establish circulation. Stage pumps to 6 bpm @ 1200 psi to help reduce friction between drill string & casing. Continue working string 30' to 60'. String starting to move down slowly. Reduce pump rate to 3 bpm with 365 psi. Continue working string down from 13163' to 13516' (That places the Hook-Hanger 10' past bottom of 7-5/8" window @ 6384'). Stop pumps. P/U 200k SIO 58k P/U on string & position Hook-Hanger @ 6340'. Rotate 1/4 turn. Run in & go past hook point. Pull back up with Hook-Hanger to 6340'. Rotate additional 1/4 turn. Run back down & land Hook-Hanger on the lower lip of 7-5/8" window @ 6384'. Reconfirm Hook-Hanger landed by picking up 20' & relanding same. Did this three times with Hook-Hanger landing out in same spot every time. Stack out all available string weight + 10k from TDS down on Hook-Hanger (+1- 33k). Drop 29/32" ball & pump on seat. Pressure up to 2700 psi to Printed: 5/312004 8:46:01 AM ) ) ·······I3REXP4QßAsTIQm.,.:,::,¡:············ .O.P~·~ª~.i,9.6.$:·.···ª:ym:Îj).ª.rS',:.R~P9·rt COMP release HWH Running tool. P/U Drill string 10' (P/U 135k) & verify HWH Running tool released. Lost 60k string wt. Set back down & tag Hook-Hanger with 25k-OK. P/U on string & place HWH Running tool @ 6335' (32' above Hook Hanger @ 6367'). RlU Side Entry Pump-in sub into the 4" DP. Pressure up to 4750 psi & blow ball seat. RID pump-in sub. M/U TDS. CBU from 6335' with 6 bpm @ 960 psi. Flow check. Well static. Pump slug. Blow down TDS. POOH with 4" DP from 6335' to surface. UD Baker HWH Running tool. Clear & clean rig floor. SAFETy---- Held PJSM with Rig Crew & Baker Service Rep regarding P/U LEM & ZXP Packer assembly. M/U LEMIZXP assembly on 4" DP. TIH with LEMIZXP assembly on 60 Std of 4" DP + 8 Std of 4" HWDP to 6316'. M/U TDS. RIH slowly to 6330'. Establish up & down string weights, P/U 125k S/O 100k. Slack off on string to set the LEM into the hook hanger collet @ 6362' with the 4.75" OD Seals stung into the Lower (OBd lateral) Seal Bore Extension @ 6475'. Land LEM with 20k. P/U 10k to verify set, then slack off 10k on ZXP packer & park pipe. Drop the 29/32" setting ball and pump onto seat @ 2 bpm wI 210 psi. Pressure up to 2500 psi, wait 2 minutes, then increased pressure to 2900 to set the ZXP packer. At this point in time while pressuring up to release the Baker Type "HRD" Packer Setting tool which was pinned to shear @ 3600 psi, the ball seat sheared prematurely at 3350 psi. CaMP Pressure test ZXP Packer x 7-5/8" casing to 1500 psi for 15 minutes. Lost 75 psi. DFAL CaMP Attempt to release from ZXP Packer. Work string up to 135k (10k Over-pull) & down to 50k with no success. Apply 2.5 Left Hand turns into string. Work torque down & attempt to release Packer Setting Tool. Tool would not release. Pull up to 150klbs (-25 klbs over PU wt). Still not indicating that Setting tool is released from L TP assembly. NOTE: The Baker Type "HRD" Setting Tools primary releasing mechanism is hydraulic with an emergency mechanical back-up Left-hand release. DFAL COMP 9ES Rig Team discussed downhole tool failure problem with the BP ODE & Baker Engineers. After evaluating the options it was decided to drop a 1.75" aD Steel Ball down the string, let gravitate on seat. Then pressure up to 4200 psi on the drill pipe to ensure that the ZXP Packer & Hold Down slips are fully set & also to shear the hydraulic release mechanism on the Packer Setting tool. DFAL COMP Waiting on Baker to deliver a 1.75" OD Steel Ball to the rig. DFAL COMP Break off TDS from DP. Drop the 1.75" aD Steel Ball down 4" DP. MIU TDS. Let ball gravitate on seat. DFAL CaMP Pressure up on drill string to 4200 psi. Hold for 10 minutes. Release pressure. P/U on string. Packer Setting tool free. P/U 12' to & position the rotating Dog Sub on HRD Setting tool above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack off on string & slam 65klbs down weight on ZXP Packer. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES . -.' ' . . " . 4:>ªtØ/ .... :F~orn.- To Hours ·Tpsk Code NPT Phase 4/12/2004 02:30 - 03:30 1.00 CASE P 03:30 - 04:30 1.00 CASE P COMP 04:30 - 07:30 3.00 CASE P COMP 07:30 - 08:30 1.00 CASE P caMP 08:30 - 09:00 0.50 CASE P COMP 09:00 - 15:30 6.50 CASE P caMP 15:30 - 17:00 1.50 CASE P caMP 17:00 - 17:30 0.50 CASE P 17:30 - 18:00 0.50 CASE N 18:00 - 20:30 2.50 CASE N 20:30 - 21 :30 21:30 - 23:00 1.00 CASE N 1.50 CASE N 23:00 - 23:30 0.50 CASE N Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations Printed: 51312004 8:46:01 AM BP EXPLORATION Operations Summary Report Page 24 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Qatø From -To Hou rs Task Code. NPT Phase ·Description of Operations 4/12/2004 23:00 - 23:30 0.50 CASE N DFAL CaMP Repeated this process 5 additional times. NOTE: Top of "L 1" ZXP Packer @ 6319' MDRKB. 23:30 - 00:00 0.50 CASE P COMP Break out TDS. Pull one std of 4" DP & rack in derrick. Blow down TDS & suriace equipment. 4/13/2004 00:00 - 01 :30 1.50 CASE P COMP Slip & cut drill line. Reset & check C-O-M. Check drawworks brake system. Service TOS. 01 :30 - 04:30 3.00 CASE P COMP POH (Wet) with 4" DP work string. UD Baker "HRD" Setting Tool. NOTE: The Dog sub was sheared on setting tool but the shear screws on the emergency mechanical release mechanism did not shear. 04:30 - 05:00 0.50 CASE P COMP Clean rig floor of excess MOBM that was generated from Wet Trip. 05:00 - 09:30 4.50 BOPSUP P WEXIT Drain stack & pull wear ring. Hold PJSM. Test BOPE to 250 psi/3500 psi. Lower pneumatic well control valve would not test. Witness of test waived by Jeff Jones - AOGCC. 09:30 - 10:30 1.00 BOPSUP P WEXIT Blow down lines. Install wear ring. 10:30 - 12:30 2.00 BOPSUF P WEXIT PJSM. Change out lower well control valve, pressure test to 250 I 3500 psi. 12:30 - 13:00 0.50 STWHIP P WEXIT Bring Baker whipstock tools to floor. 13:00 - 13:30 0.50 STWHIP P WEXIT PJSM with all personnel on handling and running Baker whipstock. 13:30 - 15:30 2.00 STWHIP P WEXIT M/U whipstock BHA wI 3 1/2" spaceout and dummy seal assembly hanging below, orient MWD wI whipstock 15:30 - 16:30 1.00 STWHIP P WEXIT RIH wI collars and HWDP, shallow test MWD 16:30 - 20:00 3.50 STWHIP P WEXIT RIH wI whipstock on 4" drillpipe, fill pipe at 4000',6250', 135K UP, 95K DN, no pump 20:00 - 21 :00 1.00 STWHIP P WEXIT Orient whipstock 7 degrees left of high side at 50' above setting depth, slack off and stab dummy seal into tieback sleeve on L-1 at 6319', set down 20K to set whipstock anchor, continue to set down 35K and shear mills off whipstock, test casing to 1500 psi, bled down 70 psi in 7 minutes, 21 :00 - 00:00 3.00 STWHIP P WEXIT Record SPR's. Start ¡ntiat cut to place Top of Window at 6229' DPM. 130K UP, 93K DN, 105K RT, 3K WOB, 118 SPM, 290 GPM, 1840 PSI, 100 RPM, 6K TQ, Mill window to 6237' MN Depth. 4/14/2004 00:00 - 00:30 0.50 STWHIP P WEXIT Mill window from 6237' to 6241', drill new hole from 6241' to 6254' RT WT 105, GPM 290, SPP 1890 psi, RPM 100, TQ 6000 00:30 - 01 :30 1.00 STWHIP P WEXIT Circulate high vis sweep S/S, 295 GPM, 1775 PSI, working string mills 01 :30 - 02:00 0.50 STWHIP P WEXIT Periorm FIT test to EMW 12.0 ppg, applied suriace pressure 650 psi, mud weight 9.2 ppg MOBM 02:00 - 04:00 2.00 STWHIP P WEXIT Monitor well, pump dry job, POH 04:00 - 05:30 1.50 STWHIP P WEXIT Stand back HWDP, Lay down DC, Lay down milling BHA, string mill in guage at 6.75" 05:30 - 06:00 0.50 STWHIP P WEXIT Clean and clear rig floor 06:00 - 06:30 0.50 STWHIP P WEXIT M/U ported sub, jet BOP stack Recovered a total of 130 Ibs of metal from milling and jetting stack 06:30 - 08:30 2.00 DRILL P WEXIT PJSM wI Anadrill DO I MWD and all rig crew, picking up of BHA # 11 and installing RA source, Printed: 5/312004 8:46:01 AM ) ) a~:.··IE2<RJ4Q8ATt~.r~~',·':'······· Q,perati oos·.SÜl1imârY·'··R:~!pörf"~' RIH w/ stands to 1172', test MWD, RIH to 6208' Circulate to obtain SPR / ECD baseline of 10.56 ppg S/O through TOW at 6229' wi no pump, continue to drill from 6254' to 7607' 123K UP, 80K DN, 99K RT WT, 114 SPM, 280 GPM, 2700 PSI ON 2330 PSI OFF, 65 RPM, 4.5 - 6.5K TO ON, 4.3 TO OFF, 3K - 12K WOB Calculated ECD 10.29 ppg, Actual ECD 10.72 ppg, Backream each stand, Survey every 30', slide as per DD AST 1.88 hrs, ART 2.41 hrs 128K UP, 86K DN, w/ no pumps PROD3 Directional Drill from 7607' to 9249', 127K UP, 86K DN, 104K RT, 114 SPM, 280 GPM, 2823 PSI ON, 2607 PSI OFF, 65 RPM, 4.5 - 7K TO ON, 4.5K TO OFF, 5- 10WOB Calculated ECD 10.38 ppg, Actual ECD 10.92 ppg Backream each stand, Survey every 30', slide as per DD. PROD3 Directional Drill from 9249' to 10,027' 140K UP, 76K DN, 101K RT, 114 SPM, 280 GPM, 3140 PSI ON 2780 PSI OFF, 65 RPM, 8 -11 TO ON, 7.1K TO OFF, 5 -15 WOB Calculated ECD 10.64 ppg, Actual ECD 11.67 ppg Backream each stand, Survey every 3D', AST 1 hr, ART 2.36 hrs PROD3 Circulate bottoms up to lower ECD from 11.67 ppg to 11.23 ppg Add 50 bbls L VT -200 PROD3 Directional Drill from 10,027' to 10,679' 142K UP, 72K DN, 101K RT, 114 SPM, 280 GPM, 3140 PSI ON 2860 PSI OFF, 65 RPM, 7 - 8.5K TO ON, 7.6K TO OFF, 5- 10 WOB Calculated ECD 10.75 ppg, Actual ECD 11.47 ppg Backream each stand, Survey every 30', slide as per DD AST 1.24 hrs, ART 2.69 hrs Circulate bottoms up twice, Calculated ECD 10.77 ppg, Actual ECD 11.48 ppg, Circulate at 280 GPM, 2850 PSI, 80 RPM, ECD after circulating 11.19 ppg Monitor well, POH 5 stds, pump dry job, intermittent drag 5 - 20K, POH to window, no problems coming thru window, POH to 6208' Rig service, service top drive and crown Slip / cut 52' of drilling line During TO service, found capscrews locating Top Drive brake disc in place on traction motor shaft had sheared off so TD brake is not functioning. Inspect & repair same. Orient MWD high sde, slide past whipstock wi no pump, fill pipe and test MWD at 7000', RIH to 9000', fill pipe, no pump, continue to 10,285', start to wash down, 250 gpm, 50 rpm, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date From-, To Hours ,:Task Code NPT Phase 4/14/2004 08:30 - 11 :30 3.00 DRILL P WEXIT 11 :30 - 12:00 0.50 DRILL P WEXIT 12:00 - 00:00 12.00 DRILL P PROD3 4/15/2004 00:00 - 12:00 12.00 DRILL P 12:00 - 17:00 5.00 DRILL P 17:00 - 18:00 1.00 DRILL P 18:00 - 00:00 6.00 DRILL P 4/16/2004 00:00 - 01 :30 1.50 DRILL P PROD3 01 :30 - 04:30 3.00 DRill P PROD3 04:30 - 05:00 0.50 DRILL P PROD3 05:00 - 06:00 1.00 DRILL P PROD3 06:00 - 10:00 4.00 DRILL N RREP PROD3 10:00 - 13:30 3.50 DRILL P PROD3 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations Printed: 51312004 8:46:01 AM BP EXPLORATION O.peratiol'1s Summ,ªryRep()r~ Page 26 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From.~To Hours Task Code NPT Phase ..... pescriptiooofoperéltions 4/16/2004 10:00 - 13:30 3.50 DRILL P PROD3 2580 psi, 12.0 ECD 13:30 - 14:30 1.00 DRILL P PROD3 At 10,285' circulate bottoms up, drop EGD from 12 to 11.20 ppg, 250 gpm, 2580 psi, 50 rpm 14:30 - 15:00 0.50 DRILL P PROD3 RIH from 10,285' to 10,585', wash from 10,585' to 10,679' 15:00 - 00:00 9.00 DRILL P PROD3 Dir Drill from 10,679' to 11,436', UP WT 148K, DN WT 56K, RT WT 102K 290 GPM, 3220 PSI ON, 2925 PSI OFF, 8 - 12 TO ON, 8.6 TO OFF, Cal ECD 10.66 ppg, Act ECD 11.38 ppg, 65 RPM, Backream each stand, driil rate up stroke, reduce rate to 250 gpm down stroke Slide as per DD, AST 1.78 hrs, ART 1.24 hrs 4/17/2004 00:00 - 02:00 2.00 DRILL P PROD3 Dir Drill from 11,436' to 11,625' 154KUP, 58KDN, 102RTWT, 118SPM, 2910 PSI OFF 3290 PSI ON, Gal ECD 10.70, Act ECD 11.31 Backream each stand at drilling rate up, 250 gpm down stroke 02:00 - 03:30 1.50 DRILL N WAIT PROD3 Circulate while wellsite Geologist consults with Anchorage Geology team. 03:30 - 11 :30 8.00 DRILL P PROD3 Dir drill from 11,625' to 12,359' 151K UP, 54K DN, 103K RT WT, 118 SPM, 3000 PSI OFF 3180 PSI ON, 8 - 10K TO ON, 8.4K TO OFF, 5 - 10K WOB Cal EGD 10.75, Act EGD 11.48, AST 1.8, ART 2.52 Backream each stand at drilling rate up, 250 gpm down stroke 11 :30 - 12:30 1.00 DRILL P PROD3 Circulate to drop ECD from 11.75 to 10.71 ppg 280 GPM, 2936 PSI, 65 RPM 12:30 - 23:00 10.50 DRILL P PROD3 Dir Drill from 12,359' to 13,106' 157K UP, 55K DN, 103K RT WT, 118 SPM, 3014 PSI OFF 3355 PSI ON, 9 - 11K TO ON, 9K TO OFF, 5 - 10K WOB Cal EGD 10.41, Act ECD 10.80, AST 2.1, ART 1.75 Backream each stand at drilling rate up, 250 gpm down stroke 23:00 - 00:00 1.00 DRILL P PROD3 Circulate to drop ECD from 10.80 to 10.41 ppg 290 GPM, 3350 PSI, 65 RPM 4/18/2004 00:00 - 00:30 0.50 DRILL P PROD3 Dir Drill, slide from 13,106' to 13,114' 152KUP, 58KDN, 100KRTWT, 114SPM, 280GPM 3350 PSI ON, 3010 PSI OFF, 1 - 5K WOB, 10K TO ON, 9K TO OFF, Cal ECD 10.80, Act ECD 11.25 00:30 - 01 :00 0.50 DRILL N DFAL PROD3 Circulate and test mud motor, motor on bottom causes pressure spike. Unable to operate motor within limits (acts as if pumping thru a stalled motor). Geologist consults Anchorage and they are prepared to call this TD for lateral L2. 01 :00 - 03:30 2.50 DRILL N DFAL PROD3 Circulate to drop ECD from 11.25 to 11.10 actual, calculated 10.80 ppg for wiper trip. 03:30 - 08:00 4.50 DRILL N DFAL PROD3 Wiper trip to window, flow check, pull 5 stands, flow check, pump slug, Minor drag at 12710' & 11120' (15 klbs over normal drag). Drop back down thru same and come back thru - OK. Continue up inside window without further tight spots or problems. 08:00 - 08:30 0.50 DRILL P PROD3 Service top drive. 08:30 - 09:30 1.00 DRILL N DFAL PROD3 Attempt to break circ to orient for exiting window. Circ pressure 4000 psi @ 200 gpm. Discuss with Anch DE and agree to POH for new motor. Drop circ sub ball and open same. Circ casing clean at 450 gpm @ 1900 psi. Monitor well & pump dry job. Printed: 51312004 8:46:01 AM ) ') SP,EXPUQRAIION ,',,>ºÞ~rª~lQl1s~$l.Imm,ªrY'=f~p,Qr~ .' .,;-"..; .....j,'>:..,,:'-,.. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Ö~te From - To Hours Task Code NPT Phåse 4/18/2004 09:30 - 12:30 3.00 DRILL N DFAL PROD3 12:30 - 14:00 1.50 DRILL N DFAL PROD3 14:00 - 14:30 0.50 DRILL N DFAL PROD3 14:30 - 15:00 0.50 DRILL N DFAL PROD3 15:00 - 17:00 2.00 DRILL N DFAL PROD3 17:00 - 22:30 5.50 DRILL N DFAL PROD3 22:30 - 00:00 1.50 DRILL N DFAL PROD3 4/19/2004 00:00 - 04:30 4.50 DRILL P PROD3 04:30 - 08:00 3.50 DRILL P PROD3 08:00 - 16:00 8.00 DRILL P PROD3 16:00 - 17:00 17:00 - 17:30 17:30 - 18:00 18:00 - 19:30 19:30 - 21 :00 21 :00 - 22:30 22:30 - 23:00 1.00 DRILL P 0.50 DRILL P 0.50 RUNCOtvP 1.50 RUNCOtvP 1.50 RUNCOtvP 1.50 RUNCOtvP 0.50 RUNCOtvP PROD3 PROD3 CaMP COMP CaMP COMP COMP 23:00 - 23:30 0.50 RUNCOtvP COMP 23:30 - 00:00 0.50 RUNCOtvP COMP 4/20/2004 00:00 - 04:00 4.00 RUNCOtvP COMP 04:00 - 05:30 1.50 RUNCOtvP COMP 05:30 - 06:30 1.00 RUNCOtvP CaMP 06:30 - 07:30 1.00 RUNCOtvP CaMP 07:30 - 16:00 8.50 RUNCOtvP CaMP Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 , ,. :.",. '::.',,: .,::. :." , ,:,,":" ':'" -',' <:: :,:~,,: '. .,:·:i. ':. Descriptio~"()fOperåti8h§i " POH for motor changeout. Will go back in with new 1.15 deg AIM motor and no Neutron/Density tool to drill remaining 400' of hole as agreed by Anch Geology and ODE. PJSM, w/ MWD, DD, rig crew on handling of source, handling BHA, change out motor, bearing pack gone Clear and clean rig floor Down load MWD and LWD, up load VPWD Make up bit # 9, run BHA # 12 RIH to 1500', shallow test MWD, RIH to 6229', orient 7 left of highside, slide through window, RIH to 10,000', fill drillstring, RIH to 10,935', taking weight approx 25k, to 110988' and again at 11680'. Wash from 13,010' to bottom. Estimate losing approx 75 bbl mud to formation during trip. Circulate to lower initial ECD on bottom of 12.14 to 10.81 ppg 213 GPM, 2058 PSI Directional drill from 13,114' to 13,490', TD for lateral # 3 157KUP, 56KDN, 99KRT, 10-15KWOB, 118SPM, 290 GPM 2920 PSI OFF, 3150 PSI ON, 10K TQ ON, 9K TQ OFF Circulate throughout to keep calculated ECD at 10.81 ppg, actual 11.41 ppg. Mud seepage loss to well at 1·2 bph. Circulate to lower actual ECD from 11.41 ppg to 11.08 ppg for trip out. Calculated ECD 10.88 ppg plus 0.2 = 11.08 ppg. Current ECD = 11.01 ppg. Moniter well, pump dry job, POH, intermitten overpull of 5 - 15K, record up / dn WT every 5 stands in open hole, every 10 stands in casing Lay down directional drilling BHA # 12 Clean and clear rig floor Pick up / make up whipstock retrieving BHA Pick up / make up 24 x 4 3/4" DCs from pipe shed 1 x 1 Trip in to 6167' w/ drillpipe Rig service, service top drive / crown Orient 7 left high side, slide hook down to 6235', work down, latched in on second attempt, pick up to 175K and set jars off, pick up to 200K and set off jars, pick up to 21 OK, whipstock free, trip to 6200', UP WT 140K, DN WT 95K Circulate bottoms up, 275 GPM, 1750 PSI, losses of 17 bbls downhole in first 10 minutes of circulating, monitor well bore, pump dry job Trip out with whipstock and assembly, UP WT 150K Trip out slowly with whipstock Lay down whipstock retrieving BHA, lay down whipstock and tail space out tubulars. Clean and clear rig floor Rig up to run 41/2" L-80 slotted liner PJSM, RIH w/ slotted liner, make up to mark, 2300 ft Ibs torque, use BOL 2000 NM dope, run at 90 seconds per joint in casing, RIH to middle of window at 6235', RIH with joint # 152, 10' down taking wt at 6330', POH to middle of window, tum pipe 1/4 tum work tq down, RIH to 6330' taking wt, POH to Printed: 5/312004 8:46:01 AM BP EXPL.ORA TION , ºper~tiQlJsSul1Jmary. Report Page 28 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 : [)ªte From - To Hours Task Code NPT Phase Description of Operß.ti()ps 4/20/2004 07:30 - 16:00 8.50 RUNCOtvP COMP 6235', turn 1/4 turn, bent jt through window on 4 th attempt, liner in open hole, run speed 60' per minute, make up hook hanger,100K UP WT, 70K DN WT, ran total of 171 jts of 4 1/2" liner 16:00 - 21 :30 5.50 RUNCOtvP COMP Change out casing equipment, rig to run stands from derrick, RIH to 13,458', 190K UP WT, 55K DN WT 21 :30 - 23:00 150 RUNCOtvP CaMP RIH to 10' past hook hanger at 13,458', turn pipe 1/4 turn, work tq in pipe, work down past window, turn pipe 1/4 turn, work tq down, work past window, failed at 2 more attempts, turn pipe 1/8 turn, work tq down, work hook past window, continue turning 1/8 turn and working past pipe down window. 200K UP WT, 50K DN WT 23:00 - 00:00 1.00 RUNCOrvP COMP Land Hook hanger, drop 29/32" ball, pump first 30 bbls at 4 bpm, 636 psi, reduce to 2 bpm, 175 psi for 15 bbls, pump 1 bbl to seat, pressure to 3000 psi, release HR tool, free pick up wt 140K, lost 60K, pressure up and shear ball seat at 4400 psi 4/21/2004 00:00 - 00:30 0.50 RUNCOtvP COMP Circulate bottoms up at 375 gpm, 2290 psi, with pumps off tag up, top of hook hanger at 6224', 11 .5' up on stand 51, monitor wellbore, pump dry job 00:30 - 05:00 4.50 RUNCOtvP CaMP Trip out, lay down 12 x 43/4" DCs, 05:00 - 06:00 1.00 RUNCOtvP COMP Lay down Baker liner running tools 06:00- 06:30 0.50 RUNCOtvP COMP Clean and clear rig floor 06:30 - 07:30 1.00 RUNCOtvP COMP Drain BOP stack, pull wear bushing, install test plug 07:30 - 11 :30 4.00 RUNCOtvP COMP PJSM, PT BOP and all related equipment to 250 psi low, 3500 psi high Perform D4 accumulator function test Witnessing waived by Lou Gramaldi AOGCC Pull test plug, install wear bushing 11 :30 - 12:00 0.50 RUNCOtvP COMP Rig service, service top drive 12:00 - 13:30 1.50 RUNCOtvP COMP Rig up, pick up, make up LEM # 2 assembly, make up to mark 3200 ft Ibs, use BOL 2000 dope, make up seal bore assembly to 4600 ft Ibs 13:30 - 15:00 1.50 RUNCOtvP COMP RIH slow on DCs, mud overflowing pick up subs, make up top drive to HWDP 15:00 - 17:00 2.00 RUNCOtvP COMP RIH through hook hanger at 6224', slide through no problems 135K UP WT, 95K DN WT 17:00 - 18:00 1.00 RUNCOtvP COMP Appear to have tagged up 13' higher, ( collar from LEM hanging up in hook hanger?) gives appearance of positive orientation and collet latch in hook hanger, two attempts, third attempt turn LEM 1/2 tum, work down to proper depth of 6345' 18:00 - 19:00 1.00 RUNCOtvP COMP Drop ball, pump 4 bpm at 713 psi for 30 bbls, pump 2 bpm at 236 psi for 11 bbls, pump 1 bpm at 100 psi until ball seated, pressure up to 4000 psi to set ZXP packer, pick up to 135K UP WT, pick up 10' to release rotating dogs, rotate setting dogs at 20 rpm, to verify packer set, pressure test annulus to 1500 psi for 10 minutes, charted, top of ZXP packer at 6173.40 ' 19:00 - 19:30 0.50 RUNCOtvP CaMP PJSM with BAKER rep and rig crew, pressure up to 3000 psi with rig pump, pressure up to 5200 psi with test pump, blow ball seat 19:30 - 20:30 1.00 RUNCOtvP CaMP Circulate bottoms up at 114 spm, 1217 psi, monitor wellbore, pump dry job Printed: 5/312004 8:46:01 AM ) ) ··E?F?E><P4Q~A¡ION .··.····.o,ñer:addns:,silirnrnar"Rep,ort -::"~.'.::;:-~': ,,"\:: :';:':'-; . "':' .. .'::,;,.>" .,...,'.' ,"':-:- ','",; ::'~";:><': >:': :"';',,:::":'." :.:">""";', ',:' ::' 1:', ': ,": :. ":'¡", : -: :: :' .:: .." .' '~ ' ' . :: . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES :Qªt$i From·-)[o Hours Task Code NPT Phase 4/21/2004 20:30 - 00:00 3.50 RUNCOfv1\J DFAL CaMP 4/22/2004 00:00 - 03:00 3.00 RUNCOfvP CaMP 03:00 - 03:30 0.50 RUNCOfvP CaMP 03:30 - 04:30 1.00 STWHIP N DFAL WEXIT 04:30 - 13:00 8.50 STWHIP N DFAL WEXIT 13:00 - 14:30 1.50 STWHIP N DFAL WEXIT 14:30 - 15:00 0.50 STWHIP P WEXIT 15:00 - 15:30 0.50 STWHIP P WEXIT 15:30 - 17:00 1.50 WHIP P WEXIT 17:00 - 18:00 1.00 WHIP P WEXIT 18:00 - 20:30 2.50 WHIP P WEXIT 20:30 - 21:00 0.50 WHIP P WEXIT 21 :00 - 21 :30 0.50 WHIP P WEXIT 21 :30 - 00:00 2.50 STWHIP P WEXIT 4/23/2004 2.00 STWHIP P 00:00 - 02:00 WEXIT 02:00 - 02:30 0.50 STWHIP P WEXIT 02:30 - 03:00 0.50 STWHI P P WEXIT 03:00 - 05:00 2.00 STWHIP P WEXIT 05:00 - 07:00 2.00 STWHIP P WEXIT 07:00 - 07:30 0.50 STWHIP P WEXIT 07:30 - 08:00 0.50 STWHIP P WEXIT 08:00 - 09:00 1.00 DRILL P WEXIT 09:00 - 09:30 0.50 DRILL P WEXIT 09:30 - 10:00 0.50 DRILL P WEXIT 10:00 - 12:00 2.00 DRILL P WEXIT 12:00 - 13:00 1.00 DRill P WEXIT 13:00 - 14:00 1.00 DRILL P WEXIT 14:00 - 14:30 0.50 DRILL P WEXIT 14:30 - 00:00 9.50 DRILL P PROD4 ... Pag(9 29.0134 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations POH, lay down 192 jts DP to pipe shed, 133K UP WT, 95K DNWT Trip out laying down drill pipe and HWDP for hard banding wear. Lay down LEM running tools Trip in 10 stands drillpipe from derrick, lay down same for hardbanding wear Pick up, make up, trip in drill pipe 1 x 1 to replace layed out drillpipe Trip out racking back 42 stands of drillpipe Clear and clean rig floor Rig service, service top drive and crown PJSM, Baker rep and rig crew, p/u, m/u, seal and whipstock assembly, orient same RIH with DCs and HWDP, 90 seconds per stand RIH with drillpipe at 90 seconds per stand Orient whipstock at 14 degrees left of high side, set anchor with 15K down at 6185', pick up to 145K, slack off to 35K, shear starting mill off whipstock at 42K Pressure test casing to 1500 psi for 5 minutes, circulate and record SPRs Begin milling at 6025', TOW, to 6031' 7K WOB, 135K UP WT, 90K ON WT, 107K RT WT, 290 GPM, 1798 PSI, 100 RPM, 7 - 8 TO Adding 200 bbls of new 9.2 ppg MOBM to active system while milling Mill window from 6031 to 6050', TOW 6025', BOW 6037', open hole from 6037' to 6050' 7 -10K WOB, 135K UP WT, 90K ON WT, 107K RT WT, 290 GPM, 1798 PSI, 100 RPM, 8 - 9 TO Circulate 50 bbl high vis pill, 60% increase in cuttings when pill at shaker FIT test to 12 ppg mud, applied surface pressure 650 psi, mud weight 9.3 ppg, TVD 4440', pressure bled down from 650 psi to 600 psi in 7 minutes, then held steady Monitor wellbore, pump dry job, trip out with mill BHA Stand back HWDP, lay down DCs, lay down milling BHA, mills in guage Clean and clear rig floor Flush stack with ported sub PJSM, PU, MU, bit # 4, BHA # 13 PJSM, load source in directional BHA RIH with BHA, shallow test MWD at 1500' RIH to 5932', fill pipe Rig service, slip and cut drilling line Rig service, service top drive, crown Break circulation, orient to 10 degree left of high side, obtain baseline ECD mud weight 9.2 ppg, ECD 10.03 ppg Directional drill from 6050' to 6773' 116K UP WT, 82K ON WT, 105K RT WT, SPM 113, GPM 280, RPM 40 TO ON 5.3, TQ OFF 3.5, Cal ECD 10.13, Act ECD 10.46 Printed: 51312004 8:46:01 AM BPEXPLORATION Operations. Su m mCiry ..Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L -201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Page.3001.34 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Directional drill from 6773' to 7147' 114 SPM, 290 GPM, 40 RPM, 9 - 11 TO ON, 8.7 TO OFF, Problems with MWD survey accuracy, a large difference from surveys and corrected surveys, roll test MWD, talk with Anadrill directional engineer about survey accuracy, decision to drill ahead PROD4 Directional drill from 7147' to 7981' 113 SPM, 276 GPM, 2500 PSi, 40 RPM, 10 - 11 TO ON, 8.9 TO OFF, Cal ECD 10.26, Act ECD 10.95, AST 1.24, A TR 3.02 PROD4 Directional drill from 7981' to 8630; 113 SPM, 273 GPM, 2540 PSI, 80 RPM, 6 TO ON, 5.5 TO OFF, Cal ECD 10.42, Act ECD 11.17 PROD4 Circulate to lower ECD from 0.8 over to 0.6 over calculated ECD of 10.42 PROD4 Directional drill from 8630' to 8848' 113 SPM, 273 GPM, 2510 PSI, 40 RPM, 6 TO ON, 5 TO OFF, Cal ECD 10.42, Act ECD 10.52 126K UP, 82K ON, 104K RT WT AST 2.72, ART 0.16 PROD4 Directional drill from 8848' to 8978' 127K UP, 83K ON, 104K RT WT, 6 TO ON, 5 TO OFF 113 SPM, 273 GPM, 5 - 20 WOB, 2520 PSI ON, 2430 PSI OFF, AST 2.9, ART 1.1 At 8978' wellbore crossed fault, consult with Anchorage geology team, decision to steer wellbore up to locate shales for drilling TVD Directional drill from 8978' to 9378', Steer well bore to 99 degrees high side, rotate out, drill ahead as per geology instructions, Circulate wellbore, consult with Anchorage geology team: Did not intend to cross 50' throw fault in this location in the polygon. Had to discuss polygon development options prior to proceeding. PROD4 Trip out from 9378' to 8715', 150K UP, 73K ON PROD4 Start trenching from 8715' to 8733', 160 degree left, 113 SPM, 280 GPM, 2440 PSI PROD4 Directional drill from 8733' to 9191', 113 SPM, 280 GPM, 2620 PSI ON, 2560 PSI OFF, 40 RPM 144K UP, 69K ON, 101 RT, Cal ECD 10.66, Act ECD 11.15, AST 4.17, ART 0.13 PROD4 Directional drill from 9191' to 9378' MD as per new geological prognosis. PROD4 Directional drill from 9378' to 9486' 2720 PSI ON, 2540 PSI OFF, 6.7 TO ON, 6.1 TO OFF, 5- 8K WOB 142K UP, 82K DN, 100K RT, Cal ECD 10.83, Act ECD 11.22 PROD4 Circulate wellbore, consult with Anchorage geology team PROD4 Directional drill from 9486' to 9860' TO for L3 Date From - To Hours Task Code NPT 4/24/2004 00:00 - 03:00 3.00 DRILL P PROD4 03:00 - 04:00 1.00 DRILL N DFAL PROD4 04:00 - 12:00 8.00 DRILL P 12:00 - 17:00 5.00 DRILL P 17:00 - 18:30 1.50 DRILL P 18:30 - 00:00 5.50 DRILL P 4/25/2004 00:00 - 02:30 2.50 DRILL P 02:30 - 03:00 0.50 DRILL P PROD4 03:00 - 05:30 2.50 DRILL C PROD4 05:30 - 13:30 8.00 DRILL C PROD4 13:30 - 14:30 14:30 - 15:00 1.00 DRILL C 0.50 DRILL C 15:00 - 00:00 9.00 DRILL C 4/26/2004 00:00 - 02:30 2.50 DRILL C 02:30 - 04:00 1.50 DRILL P 04:00 - 05:00 05:00 - 09:00 1.00 DRILL P 4.00 DRILL P Printed: 5/312004 8:46:01 AM ) ) 'SPEXPLQffiATION o p·øt'~.~.i..øn~.·.·..S·.y.m,ro:ª.ry·..[B·~'Rº·r~·'·'·': Circulate at 280 gpm, with 100 RPM for max well bore cleaning, calculated ECD 10.87, drop actual ECD to 11.17,0.3 ppg over calculated Wiper trip, monitor wellbore, pull 5 stands, pump dry job, 143k UP, 84K DN, trip to window, pull15K over at 8940,8845, 8225,8585, wipe clean, ok, pull20K over at 8758,8565, pump 125 GPM with 40 RPM, wipe clean, ok Rig service, service top drive Orient high side, slide through window with no pump, trip in to 8680', orient 145 left, slide through open hole side track, trip in to 9845', pick up single and wash to bottom at 9860' Circulate to lower ECD and clean wellbore, drop actual ecd from 11.87 to 11.05, 0.2 over calculated of 10.89 ppg 113 SPM, 280 GPM, 2610 PSI, 100 RPM, Trip out, monitor well bore, puliS stands, 143K UP, 84K DN, pump dry job, trip out Trip out of well bore to place circulating sub at window, well bore in good condition, no wiping during trip Orient to 14 deg LHS. Drop Circ-Sub opening ball, Pump at 450 GPM, 2320 PSI, wash whipstock twice, 50 % increase in cuttings at shakers during first bottoms up, 4 bottoms up to clean casing, Flow check. Well static. Pump slug. Continue POOH to top of BHA. SAFETY--- Held PJSM with rig crew & Anadrill personnel regarding removing the RA Source & UD BHA. Remove RA Source. UD all Anadrill Directional tools & bit. Clear & clean rig floor. SAFETY--- Held PJSM with rig crew, Anadrill & Baker personnel regarding M/U Whipstock retrieving tool (WSRT) & BHA. M/U WSRT & BHA which consists of the following: Whipstock Hook retrieving tool + 1 Jt of 3.5" HWDP + FS + MWD + Bumper-Sub + Oil Jar + 12 x 4-3/4" DC + XO + 24 x 4" HWDP = 1199.63'. Shallow test MWD-OK. COMP TIH with WSRT BHA on 4" DP to 5975'. COMP M/U TDS. Break circulation. Stage pumps to 280 gpm w/1675 psi. Orient WSRT to 14 deg LHS. (P/U Wt 130k S/O Wt 94k). Slack off on drill string to 6030'. P/U & engage whipstock. Pull on whipstock with 60k overpull, no release. Jar on whipstock 1 time with 95k over pull & release whipstock. P/U & pull seals out of L2 tie-back receptacle. Pull whipstock up to 6000' (P/U Wt = 136k). Monitor well 5 minutes. Annulus level fell +/- 3D'. Fill hole with 8 bbl of mud. COMP POOH 5 stds. Pump slug. Continue POOH with whipstock assembly #3 to top of BHA. COMP Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock retrieving tool, L3 Whipstock & 3.5" DP space-out assembly. 100% recovery of all Whipstock & downhole tools. Clear & clean rig floor. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES ~ '.. Houts Task Code NPT phase 4/26/2004 05:00 - 09:00 4.00 DRILL P PROD4 09:00 - 12:30 3.50 DRILL P PROD4 12:30 - 17:00 4.50 DRILL P PROD4 17:00 - 17:30 0.50 DRILL P PROD4 17:30 - 20:30 3.00 DRILL P PROD4 20:30 - 22:30 2.00 DRILL P PROD4 22:30 - 00:00 1.50 DRILL P PROD4 4/27/2004 00:00 - 02:00 2.00 DRILL P PROD4 02:00 . 03:30 1.50 DRI LL P PROD4 03:30 - 04:00 0.50 DRILL P PROD4 04:00 - 06:00 2.00 DRILL P PROD4 06:00 - 06:30 0.50 DRILL P PROD4 06:30 - 08:00 1.50 DRILL P PROD4 08:00 - 08:30 0.50 DRILL P PROD4 08:30 - 09:00 0.50 STWHIP P COMP 09:00 - 10:30 1.50 STWHIP P COMP 10:30 - 13:00 13:00 - 13:30 2.50 STWHIP P 0.50 STWHIP P 13:30 - 17:00 3.50 STWHIP P 17:00 - 19:30 2.50 STWHIP P Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 " ...',:., " .: ;", ',"'" "."""'''' , ...'.'."....":.:..' ""', ,,,,. ",,,,,,. ,.."",."..,.....,...",. .,' '," ,. Óescriptionof Oþérðtions 7.5 TO ON, 7.0 TO OFF,S -10K WOB, Cal ECD 10.90, Act ECD 11.43 Printed: 51312004 8:46:01 AM BP EXPLORATION Operati QnsSul11m aryReport Page 32 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L -201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 DatE} From· - To, Hours Task Code NPT Phase Description· of Operations 4/27/2004 19:30 - 20:30 1.00 CASE P COMP Rig up Hydraulic Casing Tongs & related equipment to run 4.5" Slotted Production Liner. 20:30 - 21 :45 1.25 CASE P COMP SAFETY --- Held PJSM with rig crew & Baker Service Reps on running 4.5" Liner & M/U Hook-Hanger assembly. 21 :45 - 00:00 2.25 CASE P COMP M/U 4-1/2" Float Shoe (Bent) Jt + 87 Jts of 4-1/2" 12.6#, L-80, I BT -M slotted liner to 3672'. M/U Torque = 3200 FtLb 4/28/2004 00:00 - 00:30 0.50 CASE P COMP Finish M/U 4-1/2" Float Shoe (Bent) Jt + 89 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner + 1 Jt of solid liner + XO Pup Jt & BOT Flanged Hook Hanger assembly. Total length = 3825.29' M/U Torque = 3200 FtLb P/U Wt = 72k --S/O Wt = 60k-- Theoretical Liner Wt in mud = 41,500 Lbs 00:30 - 01 :00 0.50 CASE P COMP Change elevators to fit 4" DP. RID Hydraulic Casing Tongs & related equipment. 01 :00 - 02:15 1.25 CASE P COMP Continue RIH with 4-1/2" slotted liner on 25 Stds of 4" DP. Tag up @ 6184' on L2 L TP. P/U 105k S/O 80k 02:15 - 02:45 0.50 CASE P COMP POOH to 6020'. Apply 1/4 RH turn in string. Reciprocate string to relax torque. TIH with the 4-1/2" slotted liner. Tag up @ 6184'. POOH to 6020'. Apply another 1/4 turn. TIH successfully entering the L3 lateral @ 6037". 02:45 - 04:45 2.00 CASE P COMP Continue TIH. Tag up @ 9380' indicating that the 4.5" Liner did not enter the open hole sidetrack in the L3 lateral @ 8715'. Original hole hole depth 9378'. 04:45 - 06:30 1.75 CASE P COMP POOH to 8700'. Apply 1/2 turn to right while pick up. TIH successfully entering the open hole sidetrack in the L3 lateral @ 8715'. Conitinue TIH to 9845'. Engage hook hanger on bottom of window @ 6037' on first attempt. 06:30 - 08:00 1.50 CASE P COMP PU 10' above window and rotate string 1/2 turn. Slack-off and run Hook-Hanger 10' below btm of window - OK. P/U string with Hook-Hanger 10' above window. Re-orient hook hanger and Land out with Hook-Hanger on bottom of window @ 6037-0K. P/U Wt = 150k SIO Wt = 85k, Set down 20k on top of hanger. Shoe at 9845'. Top of hook hanger at 6020'. Drop 29/32" ball & pump on seat. Pressure up to 3000 psi to release HWH Running tool. P/U Drill string 10' & verify HWH Running tool released. Lost 37k string wt. Set back down & tag Hook-Hanger with 25k-OK. P/U on string with Running Tool above Hook-Hanger. RlU Side Entry Pump-in sub into the 4" DP. Pressure up to 4900 psi & blow ball seat. RID pump-in sub. M/U TDS. 08:00 - 09:30 1.50 CASE P CaMP P/U on string placing end of DP @ 6000'. CBU @ 6 bpm wI 1100 psi. Flow check. Pump slug. 09:30 - 12:30 3.00 CASE P COMP POOH with 4" DP. UD Baker's Liner Running Tool. 12:30 - 13:00 0.50 CASE P COMP RlU Handling tools for LEM. 13:00 - 13:30 0.50 CASE P COMP SAFETY--- Held PJ8M with rig crew & Baker on picking up & running LEM assembly. 13:30 - 18:30 5.00 CASE P COMP P/U ZXP Packer/LEM assembly. TIH with same on 4" DP to 6006'. P/U 134k 8/0 93k Printed: 5/312004 8:46:01 AM ) ') ·...:.~F:»gXR4-Qg.A17Iç:>N . Operati()ns Summary RE!port Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES 'Date Froni- To Hours Task Code NPT . Phase 4/28/2004 18:30 - 20:00 1.50 CASE P COMP 20:00 - 20:30 0.50 CASE P COMP 20:30 - 21 :00 0.50 CASE P COMP 21 :00 - 23:00 2.00 CASE P COMP 23:00 - 00:00 1.00 CASE P CaMP 4/29/2004 00:00 - 01 :00 1.00 CASE P CaMP 01 :00 - 01 :30 0.50 CASE P CaMP 01 :30 - 06:30 5.00 CASE P COMP 06:30 - 08:30 2.00 CASE P COMP 08:30 - 14:00 5.50 CASE P CaMP 14:00 - 14:30 0.50 WHSUR P COMP 14:30 - 16:00 1.50 WHSUR P CaMP 16:00 - 16:30 0.50 RUNCO~ COMP 16:30 - 00:00 7.50 RUNCO~ COMP 4/30/2004 3.00 RUNCO~ COMP 00:00 - 03:00 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 ::......,..;.:-' ," ..'.",', ' ,,;."".'.:: ,'.,'.:":"':':;':-:".,:':'·':::"::';':"'.,i·'.:::::,;::'.,;.:"'.'.' . ,,' '.'" '''.' . ','"'''' '."".....,'.,..'. ',"" "..,-".'. [jescriptiÒnöf0pér~ti&hs:' . Continue RIH. Sting seal assembly into Seal Bore Extension @ 6196' & Land LEM in Hook-Hanger @ 6020'. P/U 10k over string weight to verify LEM engaged-OK. Drop the 29/32" setting ball and pump on seat @ 164 gpm w/ 680 psi. Pressure up to 2500 psi, wait 2 minutes, then increased pressure to 4000. P/U on string. Packer Setting tool free. P/U 10' & position the rotating Dog Sub above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack off on string & set down 50klbs on ZXP Packer. P/U 15'. R/U & blow ball seat with 5075 psi. NOTE: Top of ML3M ZXP Packer @ 5981' MDRKB. P/U on string & place LEM Running tool @ 5980'. CBU with 346 GPM @ 1760 PSI. Displace well to 9.3 ppg brine from 5980'. Pumped the following sweeps: 25 bbls L VT -200 base oil 25 bbls viscosified 9.3 ppg brine 50 bbls 9.3 ppg brine with 4 drums Safe Surf 0 25 bbls viscosified 9.3 ppg brine Follow the sweeps with 290 bbls 9.3 ppg brine until clean returns. 430 gpm, 2025 psi. Note: 170 bbls Versacoat left in hole. Load MOBM on trucks. Clean MOBM from rotary table, sumps, shakers, pits & mud return line. Finish cleaning pits & surface equipment of MOBM. Service TDS. POOH. Lay down 150 Jts of 4" DP + 12 x 4.75" DC & BOT LEM Running Tool. TIH with 8 Std of 4" HWDP + 50 Std of 4" DP from derrick to 5407' POOH. UD 150 Jts of 4" DP + 24 Jts of 4" HWDP. Clear rig floor of excess drilling equipment. Flush BOP Stack. Pull wear bushing. R/U 4.5" tbg running equipment. R/U control line spool & hang sheave for running I-wire. P/U tbg hanger & make dummy run. UD same. SAFETY--- Held PJSM with BOT, Centrilift, Camco, Nabors Casing and all rig personnel on making up and running completion string. Run 75 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with jewelry as per running orders. M/U and run I-wire for Phoenix pressure sensor. Check sensor and I-wire every 1000' of tbg run. Install 1 control line clamp per tbg joint for the 1 st 10 joints, then 1 clamp every 2 joints. Midnight depth = 3361'. Finish running 4.5" Production String from 3361'. Ran a total of 136 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with jewelry as per running orders. Check sensor and I-wire every 1000'. Install 1 control line clamp per tbg joint for the 1 st 10 joints, then 1 clamp every 2 joints to surface - 75 total clamps run. Printed: 51312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 34 of 34 BP EXPLORATION Operations Summary Reporj L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 4/30/2004 03:00 - 05:00 From - To Hours Task Code NPT Phase Description..of Operatior¡s .. Date 05:00 - 07:00 07:00 - 09:00 2.00 RUNCOtvP COMP 2.00 RUNCOtvP COMP 2.00 RUNCOtvP COMP 09:00 - 09:30 0.50 RUNCOtvP COMP 09:30 - 12:00 2.50 BOPSUP P COMP 12:00 - 15:00 3.00 WHSUR P COMP 15:00 - 16:00 1.00 WHSUR P COMP 16:00 - 19:30 3.50 WHSUR P COMP 19:30 - 20:00 20:00 - 21 :00 21 :00 - 22:00 0.50 WHSUR P COMP 1.00 WHSUR P 1.00 WHSUR P CaMP CaMP Tag up on NO-GO @ 6001'. M/U space out pups. Run I-wire through hanger & secure. Shell test Tubing Hanger to 5000 psi-OK. Land Tubing Hanger in wellhead. Space out tbg 2' above NO-GO placing the mule shoe at 5999'. RILDS and test I-wire-OK. Reverse circulate 94 bbls clean brine followed by 3 bbls corrosion inhibited brine, followed by 158 bbls clean brine. Placing corrosion inhibited brine between packer and lower GLM. 3 bpm @ 150 psi. Drop 1-7/8" ball-rod & let gravitate on seat. Pressure up tubing to 4500 psi to set packer. Bleed pressure to 3500 psi and hold for 30 minutes for tbg test. Bleed tbg pressure to 2500 psi and pressure up annulus to 3500 psi, hold for 30 minute for annular and packer test. Bleed both tbg and annulus pressure to 0 psi. Pressure up annulus, DCK valve sheared at 3000 psi. Circulate through the tubing to ensure DCK was open. UD 4.5" tubing landing joint. Install TWCV. UD Mouse Hole, pull Bell-nipple. N/D BOP_ N/U FMC 11" 5K x 4-1/16" 5K Tubing head adapter. Terminate I-Wire through adapter flange. N/U 4-1/16" 5K Production Tree. Test tubing head adapter & tree to 5000 psi. Test was API. R/U DSM lubricator. Pull TWCV. Held PJSM with Rig Crew & Little Red Hot Oil Service rep regarding freeze protecting operations. R/U Hot Oil & test lines to 2000 psi. Freeze protect 4.5" x 7 5/8" annulus. Reverse circulate 150 bbl of diesel down 4.5" x 7 5/8" annulus @ 2 bpm with 1250 psi. Let well U-Tube & equalize. DSM install BPV in Tubing Hanger. Test to 1000 psi form below. RID Hot Oil Line. DSM install VR Plugs in Tubing Spool outlets. Install needle valves & gauges on wellhead wing valve outlets. Secure well. Clean up cellar area. Release Rig @ 22:00 Hrs April 30, 2004 Printed: 5/312004 8:46:01 AM ) ) bp C L-201 L2 Survey Report Schlumberger Report Data: Apri1190, 2004 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 130.000· Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure / Slot: L-PAD/N-U TVD Reference Datum: Rotary Table Well: L-201 TVD Reference Elevation: 78,70 ft relative to MSL Borehole: L-201 L2 Sea Bed I Ground Level Elevation: 50.20 ft relative to MSL UWI/API#: 500292320261 Magnetic Declination: 24,991· Survey Name / Data: L-201 L2/ April 19, 2004 Total Field Strength: 57561,951 nT Tort / AHD / DDII ERD ratio: 454.461< /11157.34 ft /7,170/2.413 Magnetic Dip: 80.823· Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 20, 2004 Location LatlLong: N 70.35073717, W 149.32347531 Magnetic Declination Model: BGGM 2003 Location Grid N/E Y/X: N 5978320.840 ftUS, E 583325.340 ftUS North Reference: True North Grid Convergence Angle: +0.63713312· Total Corr Mag North -> True North: +24,991· Grid Scale Factor: 0.99990789 Local Coordinates Referenced To: Well Head Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/100 ft ) (ftUS) (ftUS) 0,00 0.00 0,00 -78.70 0,00 0.00 0,00 0.00 0.00 0.00 0,00 0,00 5978320,84 583325,34 N 70,35073717 W 149,32347531 124,00 0,22 237.38 45,30 124.00 -0.07 0.24 -0,13 -0,20 0.18 0.18 0,00 5978320.71 583325.14 N 70,35073682 W 149,32347694 224,00 0.52 340,14 145,30 224.00 -0,52 0.75 0,19 -0,52 0.61 0,30 102,76 5978321.03 583324,82 N 70,35073770 W 149.32347951 324,00 2,13 19.40 245,27 323.97 -1.57 3,00 2,37 -0,05 1.76 1.61 39,26 5978323,21 583325.26 N 70.35074366 W 149,32347575 395,00 4.15 21,01 316,16 394,86 -2,87 6,89 6,02 1.31 2,85 2.85 2.27 5978326,87 583326.58 N 70,35075361 W 149,32346471 495,00 5,88 17.19 415.77 494.47 -6,03 15.63 14,29 4.12 1,76 1,73 -3,82 5978335,17 583329,30 N 70.35077621 W 149.32344189 595.00 8,86 11.46 514.94 593.64 -11.70 28.45 26,73 7,16 3,07 2,98 -5.73 5978347.65 583332.20 N 70,35081020 W 149,32341717 695,00 11.87 12.48 613,29 691,99 -20,13 46.44 44,33 10.92 3,02 3,01 1.02 5978365,28 583335,76 N 70.35085827 W 149.32338670 758.99 14.48 14,62 675.59 754.29 -26,60 61.02 58,50 14.36 4.15 4,08 3.34 5978379.49 583339.05 N 70.35089697 W 149,32335876 853,05 17.37 16.52 766.04 844,74 -37,24 86.82 83,34 21.32 3,12 3.07 2.02 5978404.41 583345,73 N 70,35096485 W 149,32330224 947.46 19.62 16.37 855.56 934,26 -49,21 116,77 112.06 29.80 2,38 2.38 -0.16 5978433,22 583353.88 N 70,35104332 W 149.32323343 1040,82 22,84 16,89 942,58 1021.28 -62,61 150,57 144.45 39.48 3.45 3.45 0,56 5978465,71 583363,21 N 70.35113179 W 149,32315481 1132,91 25.75 16.87 1026,50 1105,20 -77.48 188.45 180.70 50.48 3,16 3.16 -0,02 5978502.07 583373,80 N 70,35123083 W 149.32306550 1226.13 27,99 17.46 1109,65 1188.35 -93,82 230,58 220,95 62.92 2.42 2.40 0,63 5978542.46 583385.79 N 70.35134079 W 149.32296450 1321.50 29.42 18,07 1193.30 1272,00 -111.15 276,39 264.57 76,90 1,53 1.50 0,64 5978586,22 583399.29 N 70,35145995 W 149,32285099 1416.81 31.11 18,21 1275.62 1354.32 -129,04 324.42 310.22 91,86 1.77 1,77 0.15 5978632.03 583413.74 N 70,35158465 W 149,32272956 1511,08 32,79 18,97 1355.60 1434.30 -147,24 374,31 357.49 107.77 1.83 1,78 0,81 5978679.48 583429.12 N 70,35171381 W 149.32260040 1604,81 34.13 19,21 1433.80 1512.50 -165,68 425,98 406,33 124,67 1.44 1.43 0.26 5978728.49 583445.47 N 70,35184722 W 149.32246316 1699,54 33,73 19.32 1512.40 1591,10 -184.40 478.86 456,24 142.12 0.43 -0.42 0.12 5978778.59 583462,36 N 70,35198358 W 149.32232152 1797,56 36.27 18,62 1592,68 1671,38 -204,58 535,08 509.41 160.38 2.62 2.59 -0,71 5978831,96 583480,03 N 70,35212883 W 149.32217323 1892,80 37.18 18,91 1669.02 1747.72 -225,21 592,03 563.33 178.70 0.97 0.96 0.30 5978886,07 583497,75 N 70,35227614 W 149.32202448 1988.07 39.87 19.15 1743,55 1822,25 -246.44 651,36 619.42 198.05 2.83 2,82 0,25 5978942,37 583516,48 N 70,35242937 W 149,32186737 2081.93 41.57 20,11 1814.68 1893.38 -267,74 712,59 677.09 218,63 1,93 1,81 1,02 5979000,26 583536.41 N 70.35258691 W 149,32170029 2175.78 42,75 19.75 1884,25 1962.95 -289,36 775,58 736,31 240.10 1,28 1.26 -0,38 5979059,70 583557,22 N 70,35274869 W 149,32152597 2269,96 45.03 20.88 1952.12 2030.82 -311,34 840,87 797,53 262,78 2.56 2.42 1,20 5979121.17 583579,21 N 70.35291593 W 149.32134182 2361,74 45.50 21.16 2016,71 2095.41 -332,55 906,07 858,39 286,17 0.56 0,51 0,31 5979182.28 583601,92 N 70.35308219 W 149.32115193 2458.33 47.95 21.23 2082,92 2161,62 -355,21 976,38 923,95 311.59 2.54 2.54 0,07 5979248.11 583626,61 N 70,35326130 W 149.32094549 2552,24 48.94 21.51 2145.22 2223,92 -377,66 1046,66 989,39 337,20 1.08 1.05 0,30 5979313,83 583651.48 N 70.35344008 W 149.32073755 2645,64 49.74 21,45 2206.07 2284.77 -400,17 1117.51 1055,32 363.14 0.86 0.86 -0,06 5979380,04 583676.69 N 70.35362019 W 149.32052688 2740,10 50,69 21.63 2266.52 2345,22 -423,15 1190.10 1122,84 389,79 1,02 1.01 0,19 5979447,84 583702.59 N 70.35380464 W 149,32031046 2834,26 50,10 21.09 2326.54 2405,24 -446,34 1262.64 1190.40 416,22 0.77 -0,63 -0,57 5979515,68 583728,26 N 70,35398921 W 149,32009588 2928.38 49.29 22,08 2387.43 2466,13 -469,01 1334.42 1257,15 442,62 1.18 -0.86 1,05 5979582,71 583753.91 N 70.35417154 W 149.31988149 3022,90 49,04 23.22 2449.23 2527,93 -490,34 1405.93 1323,14 470,16 0,95 -0,26 1.21 5979649.00 583780.71 N 70.35435183 W 149,31965786 3117.47 48.89 23.30 2511,32 2590,02 -510,89 1477,27 1388,68 498,33 0,17 -0.16 0,08 5979714,84 583808,15 N 70,35453086 W 149,31942910 3152,16 49.11 23,20 2534,08 2612,78 -518.43 1503.45 1412,73 508,66 0,67 0,63 -0,29 5979739.01 583818,21 N 70.35459658 W 149.31934517 3266,50 47.43 25,10 2610,19 2688.89 -541.75 1588.77 1490,59 543.55 1,92 -1.47 1.66 5979817,25 583852.23 N 70.35480928 W 149,31906183 3325,61 49,36 23,06 2649.43 2728,13 -553,88 1632,97 1530,95 561,57 4,16 3,27 -3.45 5979857,79 583869.80 N 70,35491951 W 149,31891549 3420,36 50,09 23,79 2710,69 2789.39 -574.50 1705.25 1597,27 590,31 0,97 0.77 0.77 5979924.43 583897,80 N 70.35510071 W 149,31868208 3515,35 49,54 23,70 2771.98 2850,68 -594,82 1777. 82 1663,70 619,53 0,58 -0.58 -0.09 5979991.17 583926,28 N 70,35528217 W 149,31844476 3609,16 49,34 23.32 2832,98 2911,68 -615.05 1849,09 1729,05 647,96 0,37 -0,21 -0.41 5980056.83 583953,98 N 70.35546071 W 149,31821387 3701,35 50,03 21,52 2892,63 2971,33 -636,28 1919,38 1794,03 674.77 1,67 0,75 -1,95 5980122.09 583980,05 N 70.35563821 W 149,31799618 3794,96 50,31 21,39 2952,59 3031.29 -659,14 1991,27 1860.94 701,06 0.32 0,30 -0.14 5980189.28 584005,60 N 70.35582099 W 149.31778262 3888,81 50,23 21,33 3012,57 3091,27 -682.21 2063.45 1928,16 727.35 0,10 -0,09 -0,06 5980256,78 584031,14 N 70,35600462 W 149,31756910 3982,46 49,83 20,65 3072. 73 3151.43 -705,59 2135,22 1995.16 753,06 0.70 -0.43 -0.73 5980324.07 584056.10 N 70,35618767 W 149,31736028 4076.83 49,57 20,57 3133.77 3212.47 -729.49 2207.19 2062,53 778,39 0,28 -0,28 -0,08 5980391,70 584080,68 N 70.35637170 W 149,31715449 4172.21 49,68 19,90 3195,56 3274,26 -754,06 2279.86 2130,71 803,52 0,55 0,12 -0,70 5980460,15 584105,05 N 70,35655795 W 149,31695036 4266.06 48,39 21,00 3257.08 3335,78 -777,78 2350,72 2197,11 828,28 1.63 -1,37 1,17 5980526.82 584129.06 N 70,35673934 W 149,31674930 4360,01 47,90 21.14 3319.77 3398,47 -800.48 2420,70 2262.41 853.43 0,53 -0,52 0,15 5980592,38 584153.49 N 70.35691772 W 149,31654495 4454.28 47,80 22,75 3383,03 3461,73 -822,14 2490,59 2327,23 879.55 1,27 -0,11 1,71 5980657.49 584178,88 N 70,35709480 W 149,31633280 4548,11 48,18 26,94 3445,85 3524,55 -840.35 2560.29 2390.47 908,84 3,34 0.40 4.47 5980721.04 584207.46 N 70.35726755 W 149,31609491 4641,89 48,96 31,87 3507,92 3586,62 -853,25 2630.58 2451,68 943,36 4,03 0,83 5,26 5980782,62 584241,29 N 70.35743475 W 149.31581454 4735.40 48,79 36.31 3569.44 3648,14 -860,51 2701,01 2509.98 982,82 3,58 -0,18 4.75 5980841.36 584280,1 ° N 70,35759404 W 149,31549403 4829,57 48,97 40,88 3631,39 3710,09 -862,24 2771.93 2565.40 1027,05 3.66 0,19 4,85 5980897,26 584323,71 N 70.35774541 W 149.31513475 4923.41 48.83 47,15 3693.11 3771,81 -857,30 2842,62 2616,21 1076,14 5,04 -0,15 6,68 5980948.61 584372.22 N 70,35788420 W 149.31473606 SurveyEditor Ver 3,1 RT -SP3,03-HF4.00 Bld( do31 rt-546 ) N-U\L-201\L-201 L2\L-201 L2 Generated 5/5/2004 1 :01 PM Page 1 of 5 ) ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft) (ft ) ( deg/1 00 ft ) ( deg/100 ft ) ( deg/100 ft ) (ftUS) (ftUS) 5016.44 49,09 54,19 3754,24 3832,94 -844,31 2912,75 2660,62 1130,36 5.71 0,28 7,57 5980993,62 584425,94 N 70,35800551 W 149,31429571 5110,60 48,23 58,33 3816.45 3895,15 -824,54 2983.43 2699,89 1189.11 3.42 -0,91 4.40 5981033,53 584484,25 N 70,35811275 W 149,31381851 5204,87 49.16 62.86 3878.69 3957,39 -799.63 3054,23 2734,62 1250,78 3,74 0.99 4,81 5981068,94 584545,52 N 70,35820761 W 149,31331763 5298,92 47.75 68.46 3941,09 4019,79 -769,20 3124,59 2763,65 1314.85 4,70 -1,50 5,95 5981098.67 584609.26 N 70,35828687 W 149,31279728 5392,93 49.39 73.49 4003.32 4082,02 -732,92 3195,05 2786,57 1381.46 4,37 1,74 5,35 5981122,34 584675,60 N 70,35834947 W 149,31225633 5487,16 51.11 80,03 4063,61 4142.31 -689,56 3267.47 2803.10 1451,92 5,64 1,83 6,94 5981139,64 584745,86 N 70,35839458 W 149,31168408 5582,88 53.94 84,88 4121,86 4200,56 -638,27 3343.41 2813.00 1527,19 4.99 2.96 5,07 5981150.39 584821,01 N 70,35842161 W 149,31107280 5677.97 56.15 89.22 4176.36 4255,06 -581.23 3421,33 2816,97 1604,99 4,40 2,32 4,56 5981155.22 584898.75 N 70,35843241 W 149.31044097 5769,98 58.26 91,53 4226,20 4304,90 -521.65 3498,66 2816.45 1682,32 3,12 2,29 2,51 5981155.56 584976,08 N 70,35843093 W 149,30981296 5862,16 59.02 94,81 4274,18 4352,88 -458.65 3577.37 2812,09 1760.89 3,15 0,82 3.56 5981152.07 585054.69 N 70,35841896 W 149,30917484 5955.46 61.37 98.97 4320,56 4399,26 -390.85 3658,32 2802,35 1841.23 4,62 2.52 4.46 5981143,22 585135,12 N 70.35839229 W 149.30852243 6049,62 64.61 102.59 4363,33 4442,03 -317.64 3742,19 2786.62 1923.60 4,85 3.44 3,84 5981128.42 585217,66 N 70,35834929 W 149,30785351 6143,03 65,95 107,59 4402.41 4481,11 -240,71 3827.03 2764,52 2005.48 5,07 1.43 5,35 5981107,23 585299,77 N 70,35828886 W 149,30718859 6229,00 68.41 110.67 4435,76 4514,46 -166,68 3906,26 2738,54 2080,33 4,37 2,86 3.58 5981082.09 585374.89 N 70,35821782 W 149,30658085 6241.00 70,32 110.46 4439.99 4518,69 -156,09 3917.49 2734,60 2090.84 16.00 15,92 -1,75 5981078,26 585385.45 N 70.35820704 W 149,30649547 6248,82 70,86 110,87 4442,59 4521,29 -149,13 3924,86 2732,00 2097,74 8.49 6.91 5,24 5981075.74 585392,38 N 70.35819992 W 149.30643944 6280,05 74,34 112.47 4451,93 4530.63 -120,85 3954,66 2720.99 2125.43 12.17 11,14 5.12 5981065,04 585420,18 N 70,35816984 W 149.30621461 6311,72 78.37 114,05 4459.40 4538,10 -91,38 3985.43 2708,84 2153.69 13,62 12.72 4.99 5981053,20 585448,58 N 70.35813661 W 149.30598508 6342,77 82.86 115,55 4464.46 4543.16 -61.83 4016.06 2695,99 2181.49 15.23 14.46 4.83 5981040,66 585476,52 N 70.35810149 W 149.30575935 6373,77 87.77 117,02 4466,99 4545,69 -31,82 4046,94 2682,31 2209.19 16,53 15.84 4,74 5981027,30 585504.36 N 70,35806410 W 149,30553449 6404.96 91.54 118.49 4467,18 4545,88 -1,35 4078,13 2667.79 2236.78 12.97 12,09 4.71 5981013,08 585532.11 N 70.35802440 W 149,30531043 6436.66 93.43 119.98 4465,80 4544.50 29,76 4109.80 2652.32 2264.42 7,59 5,96 4.70 5980997.93 585559,91 N 70,35798213 W 149.30508605 6467,17 92,51 121,35 4464,22 4542,92 59.83 4140,26 2636,78 2290,62 5.40 -3,02 4.49 5980982.68 585586.29 N 70.35793965 W 149,30487326 6498.86 91.78 122.78 4463,04 4541,74 91,19 4171,93 2619.97 2317.46 5.06 -2,30 4.51 5980966.17 585613.31 N 70,35789370 W 149.30465537 6529.76 91,98 122.67 4462.02 4540,72 121.83 4202,82 2603.28 2343.44 0,74 0.65 -0,36 5980949,77 585639.47 N 70,35784807 W 149,30444442 6560.75 91,81 122,83 4461.00 4539,70 152.55 4233,79 2586.52 2369.49 0.75 -0,55 0.52 5980933.30 585665.70 N 70,35780227 W 149.30423291 6591,97 92,70 123,94 4459.77 4538.47 183,54 4264,98 2569,35 2395,54 4.55 2,85 3.56 5980916,43 585691,94 N 70,35775536 W 149,30402142 6622,94 91.47 122.58 4458,64 4537,34 214,27 4295,93 2552,38 2421.42 5,92 -3.97 -4,39 5980899.75 585718,00 N 70,35770896 W 149,30381131 6654,79 88,79 124,93 4458.57 4537,27 245.93 4327,78 2534,69 2447,89 11,19 -8,41 7,38 5980882,35 585744,67 N 70.35766060 W 149,30359635 6685,75 89.62 123.41 4459,00 4537,70 276,72 4358,74 2517,30 2473.51 5,59 2.68 -4,91 5980865.25 585770.47 N 70,35761308 W 149,30338840 6716.49 91,43 125.79 4458,72 4537.42 307,32 4389.47 2499.85 2498,80 9,73 5,89 7.74 5980848,08 585795,96 N 70.35756538 W 149.30318300 6748,09 91.88 125.69 4457,81 4536.51 338,82 4421.06 2481.40 2524.44 1.46 1.42 -0.32 5980829,92 585821 ,80 N 70.35751495 W 149.30297485 6778.86 92.32 125.04 4456,68 4535.38 369.47 4451.81 2463.60 2549.52 2,55 1.43 -2.11 5980812.40 585847,07 N 70.35746631 W 149,30277127 6809,61 91.88 124.18 4455,55 4534,25 400.06 4482,54 2446.15 2574.81 3.14 -1.43 -2,80 5980795,23 585872,55 N 70.35741860 W 149.30256593 6841 .48 91.02 124.41 4454,74 4533.44 431.77 4514.40 2428,20 2601.13 2.79 -2,70 0.72 5980777,58 585899,07 N 70,35736954 W 149,30235224 6872.68 89.75 124,25 4454,53 4533,23 462.81 4545,60 2410.60 2626.89 4.10 -4.07 -0.51 5980760,27 585925,02 N 70,35732144 W 149,30214307 6903.03 90.78 124.72 4454.39 4533,09 493.02 4575,95 2393.42 2651,91 3,73 3.39 1.55 5980743.37 585950.22 N 70,35727448 W 149,30193997 6934.85 90.20 123.00 4454,12 4532,82 524,66 4607.77 2375,69 2678.33 5,70 -1,82 -5.41 5980725.94 585976,84 N 70.35722602 W 149.30172546 6966.15 89.51 123.07 4454,20 4532.90 555,72 4639,07 2358,63 2704.57 2,22 -2,20 0,22 5980709.17 586003.26 N 70,35717938 W 149,30151243 6996,79 90.40 125,50 4454,23 4532,93 586.21 4669,70 2341.37 2729.88 8.45 2,90 7,93 5980692,20 586028.77 N 70.35713221 W 149,30130691 7027,89 90.75 126,05 4453.91 4532,61 617.22 4700.80 2323,19 2755.12 2.10 1.13 1,77 5980674.30 586054,19 N 70,35708252 W 149,30110208 7058.05 90.68 125,62 4453,54 4532,24 647,30 4730.96 2305,53 2779.56 1.44 -0,23 -1,43 5980656.92 586078,84 N 70,35703426 W 149,30090359 7088,89 90,58 125,09 4453,20 4531,90 678,04 4761,80 2287.69 2804.72 1,75 -0,32 -1.72 5980639,36 586104,18 N 70.35698548 W 149.30069940 7120.17 90.71 125,09 4452.85 4531,55 709.20 4793,08 2269,71 2830,31 0.42 0.42 0,00 5980621,66 586129,97 N 70,35693634 W 149,30049163 7151,57 90,95 125,18 4452,39 4531.09 740.49 4824.47 2251.64 2855,98 0,82 0,76 0,29 5980603,88 586155,84 N 70.35688695 W 149.30028318 7182.56 90.82 126,27 4451,91 4530,61 771.38 4855.46 2233,55 2881,14 3.54 -0.42 3,52 5980586.07 586181,20 N 70,35683749 W 149,30007896 7213.70 90.92 125.44 4451.44 4530.14 802.44 4886.60 2215.31 2906,38 2.68 0,32 -2.67 5980568,12 586206,63 N 70,35678764 W 149.29987409 7245.02 90,78 125,96 4450,97 4529.67 833,67 4917,91 2197.03 2931,81 1,72 -0.45 1.66 5980550,13 586232.26 N 70.35673769 W 149.29966763 7276,03 90.51 126.98 4450,63 4529,33 864,62 4948.92 2178.60 2956.74 3.40 -0,87 3.29 5980531,98 586257.40 N 70.35668731 W 149,29946521 7307,25 90,30 125.32 4450.41 4529,11 895.76 4980,14 2160,19 2981,95 5,36 -0.67 -5.32 5980513,85 586282,81 N 70,35663698 W 149,29926057 7338,59 91.50 125,50 4449,91 4528,61 927,00 5011.48 2142,03 3007.49 3.87 3,83 0,57 5980495,98 586308,54 N 70.35658735 W 149,29905324 7369,09 92,94 123.50 4448.73 4527.43 957,33 5041.95 2124.77 3032.60 8.08 4,72 -6,56 5980479,00 586333,85 N 70.35654016 W 149,29884935 7401.26 92,05 121,30 4447,33 4526,03 989.19 5074,09 2107,55 3059,74 7,37 -2.77 -6,84 5980462.08 586361,17 N 70,35649309 W 149,29862906 7431,83 92,81 119,69 4446.03 4524,73 1019,31 5104.63 2092.05 3086,06 5,82 2.49 -5,27 5980446,88 586387,65 N 70,35645072 W 149,29841541 7462,82 92,77 118,64 4444,53 4523,23 1049,71 5135,59 2076,97 3113,08 3.39 -0.13 -3,39 5980432.10 586414,85 N 70,35640948 W 149,29819598 7493,89 92,60 118.24 4443,07 4521,77 1080,12 5166,62 2062.19 3140.37 1.40 -0,55 -1,29 5980417,62 586442,30 N 70,35636907 W 149,29797443 7524,87 92,12 119.42 4441.79 4520.49 1110.48 5197,58 2047.26 3167,49 4,11 -1,55 3.81 5980403,00 586469,57 N 70,35632826 W 149,29775428 7555.40 92,77 119,58 4440.49 4519,19 1140.48 5228,08 2032,24 3194,04 2.19 2,13 0,52 5980388.28 586496,28 N 70,35628720 W 149,29753876 7586,23 92,87 119.27 4438,98 4517,68 1170,75 5258,87 2017,11 3220,86 1,06 0,32 -1,01 5980373,45 586523,27 N 70,35624584 W 149,29732102 7616,72 91,78 119,82 4437,74 4516.44 1200,70 5289,34 2002,09 3247,36 4.00 -3,57 1,80 5980358,73 586549,93 N 70,35620477 W 149,29710586 7648,68 91,50 120,56 4436,82 4515,52 1232.18 5321,28 1986,03 3274,98 2.47 -0,88 2,32 5980342,97 586577,72 N 70,35616085 W 149,29688169 7678,75 91,30 118.58 4436,09 4514,79 1261,75 5351,34 1971,19 3301.12 6,62 -0,67 -6,58 5980328.43 586604,03 N 70,35612029 W 149,29666945 7710,19 89,75 116,02 4435,80 4514.50 1292.41 5382.78 1956.77 3329,05 9.52 -4.93 -8,14 5980314,32 586632,12 N 70,35608087 W 149.29644267 7740,23 89,07 115.88 4436,11 4514,81 1321,55 5412,82 1943.63 3356,06 2,31 -2,26 -0.47 5980301.48 586659,27 N 70.35604493 W 149.29622339 7770,76 89.10 114,78 4436.60 4515,30 1351,08 5443.35 1930,57 3383,65 3.60 0,10 -3,60 5980288.73 586687,00 N 70,35600922 W 149,29599940 7801.46 89.44 113,27 4436,99 4515,69 1380,59 5474,04 1918,07 3411,69 5,04 1,11 -4.92 5980276,55 586715.17 N 70,35597504 W 149,29577178 7832,24 89,51 112,57 4437,27 4515.97 1410.02 5504,82 1906,09 3440,04 2,29 0,23 -2.27 5980264,88 586743,65 N 70,35594226 W 149.29554162 7863,07 88,52 112.49 4437,80 4516.50 1439,42 5535,65 1894,28 3468,51 3.22 -3,21 -0,26 5980253,39 586772.25 N 70.35590996 W 149,29531047 7893,97 88.17 111,13 4438,69 4517,39 1468,76 5566,53 1882,80 3497,19 4,54 -1,13 -4.40 5980242,23 586801.05 N 70,35587857 W 149,29507766 7924,35 87,80 111,31 4439.76 4518.46 1497,51 5596.89 1871,81 3525.49 1.35 -1,22 0,59 5980231,56 586829.47 N 70.35584851 W 149,29484788 7954,78 88.62 112.43 4440,71 4519.41 1526.41 5627,31 1860.48 3553,72 4,56 2,69 3,68 5980220,54 586857,82 N 70,35581752 W 149,29461874 SurveyEditor Ver 3,1 RT -SP3,03-HF4,OO Bld( do31 rt-546 ) N-U\L-201 \L-201 L2\L-201 L2 Generated 5/5/2004 1 :01 PM Page 2 of 5 ) ') Measured Inclination Azimuth Sub-Sea TVO TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) (deg/100 ft) ( deg/100 ft) ( deg/100 ft ) (ftUS) (ftUS) 7985.18 89.17 112.51 4441,30 4520,00 1555,39 5657,70 1848,86 3581,80 1,83 1.81 0.26 5980209,24 586886,03 N 70,35578575 W 149.29439071 8015.88 89,51 113,01 4441,65 4520,35 1584,71 5688.40 1836,99 3610,11 1,97 1,11 1.63 5980197,68 586914.46 N 70,35575327 W 149,29416090 8046,12 89.51 112,14 4441,91 4520,61 1613,56 5718,64 1825,38 3638,03 2,88 0,00 -2,88 5980186,39 586942,51 N 70,35572152 W 149.29393422 8077,32 89,51 113,36 4442,18 4520,88 1643,36 5749,84 1813,32 3666.80 3,91 0,00 3.91 5980174.64 586971.41 N 70,35568852 W 149,29370064 8107,85 88.76 110,70 4442.64 4521.34 1672.39 5780,37 1801,87 3695,10 9,05 -2.46 -8,71 5980163,51 586999,83 N 70,35565721 W 149,29347093 8137,95 88,35 109,61 4443.40 4522,10 1700,70 5810.46 1791.50 3723.35 3,87 -1,36 -3,62 5980153.46 587028.19 N 70.35562884 W 149.29324160 8170.69 88.38 110,15 4444,33 4523,03 1731.42 5843,18 1780,37 3754,12 1,65 0,09 1,65 5980142,67 587059.08 N 70,35559840 W 149,29299175 8201,08 88.28 110,01 4445.22 4523,92 1759,98 5873,56 1769,94 3782.65 0.57 -0,33 -0.46 5980132,56 587087,72 N 70,35556987 W 149,29276012 8230,81 88.90 110,50 4445,95 4524.65 1787,96 5903,28 1759,65 3810,53 2,66 2,09 1.65 5980122.59 587115,72 N 70,35554172 W 149,29253376 8262.68 88.83 108,83 4446,58 4525,28 1817.83 5935,14 1748,93 3840.54 5.24 -0,22 -5,24 5980112.20 587145.83 N 70,35551239 W 149,29229017 8294,28 88.73 110.19 4447,25 4525,95 1847.43 5966,74 1738,38 3870.32 4,31 -0,32 4.30 5980101.98 587175,73 N 70,35548352 W 149,29204841 8323,73 89.48 109,35 4447.71 4526.41 1875.06 5996,18 1728.42 3898,03 3,82 2.55 -2.85 5980092.33 587203,54 N 70,35545627 W 149,29182344 8355.45 89.55 109.32 4447,98 4526,68 1904,74 6027.90 1717,92 3927.96 0,24 0,22 -0.09 5980082,16 587233,58 N 70,35542754 W 149.29158046 8387,07 89.41 109.56 4448,27 4526.97 1934,34 6059,52 1707,39 3957,77 0,88 -0.44 0,76 5980071,97 587263.51 N 70,35539875 W 149.29133840 8417.57 89,14 110.31 4448,65 4527.35 1962,99 6090,02 1696,99 3986.44 2,61 -0,89 2.46 5980061,89 587292.29 N 70.35537030 W 149,29110564 8448,80 89,03 109.58 4449.15 4527,85 1992.32 6121,24 1686,34 4015,80 2.36 -0,35 -2,34 5980051.57 587321,76 N 70.35534116 W 149,29086735 8479,96 89,03 110,35 4449,68 4528,38 2021,59 6152.40 1675.70 4045.08 2.47 0,00 2.47 5980041,26 587351.16 N 70,35531205 W 149.29062962 8511.02 89,31 109.94 4450.13 4528,83 2050.80 6183.46 1665,01 4074,24 1,60 0,90 -1,32 5980030,89 587380.43 N 70.35528279 W 149,29039292 8542,50 89,14 109,50 4450,56 4529,26 2080,32 6214.93 1654.39 4103.87 1,50 -0.54 -1.40 5980020,60 587410.17 N 70,35525373 W 149.29015236 8573.63 89,10 110.24 4451,03 4529,73 2109.55 6246.06 1643.81 4133,14 2,38 -0,13 2,38 5980010,35 587439,56 N 70.35522478 W 149,28991472 8604,75 89,00 110.66 4451.55 4530.25 2138,87 6277.18 1632.94 4162,29 1,39 -0.32 1,35 5979999,80 587468,83 N 70.35519504 W 149,28967804 8636.06 88.96 109,92 4452.11 4530.81 2168,34 6308.48 1622,08 4191.66 2,37 -0.13 -2,36 5979989,27 587498.31 N 70.35516534 W 149,28943967 8667.42 89.48 111,11 4452.54 4531,24 2197,90 6339.84 1611,09 4221,02 4,14 1,66 3,79 5979978,61 587527,79 N 70.35513527 W 149.28920126 8697.97 89.07 114,26 4452,92 4531,62 2227,06 6370,39 1599,31 4249.21 10.40 -1,34 10,31 5979967,15 587556.10 N 70,35510305 W 149,28897249 8729,75 88.93 115,34 4453.48 4532,18 2257,73 6402.16 1585.98 4278,05 3.43 -0.44 3.40 5979954,14 587585,09 N 70.35506659 W 149,28873834 8761,18 88,93 115.60 4454,06 4532,76 2288.14 6433.59 1572.47 4306.42 0.83 0,00 0,83 5979940,95 587613,60 N 70.35502963 W 149,28850804 8792,70 88.66 115.44 4454,73 4533.43 2318.66 6465,10 1558,89 4334.86 1,00 -0,86 -0,51 5979927.69 587642.19 N 70.35499249 W 149,28827719 8823,53 88.45 115,21 4455.50 4534,20 2348.47 6495.92 1545.71 4362,72 1.01 -0,68 -0,75 5979914,82 587670.19 N 70,35495643 W 149.28805105 8854,68 90.23 116.92 4455,86 4534.56 2378.70 6527,06 1532,03 4390.69 7,92 5,71 5.49 5979901.45 587698,32 N 70.35491900 W 149,28782394 8885,79 91.64 115.73 4455.35 4534.05 2408,92 6558.17 1518.23 4418,57 5,93 4,53 -3,83 5979887,96 587726,34 N 70,35488128 W 149.28759764 8917.62 91.47 116,20 4454.49 4533.19 2439,79 6589,99 1504,30 4447.18 1,57 -0,53 1.48 5979874,35 587755,10 N 70,35484317 W 149.28736543 8948,92 91.30 116.94 4453,73 4532.43 2470,23 6621,28 1490.31 4475.17 2.43 -0,54 2,36 5979860.67 587783.24 N 70.35480489 W 149,28713826 8979,55 90,95 116,08 4453.13 4531,83 2500,00 6651.90 1476.64 4502,57 3,03 -1,14 -2,81 5979847,31 587810,79 N 70.35476750 W 149.28691581 9010,60 90.65 116.96 4452,70 4531.40 2530,20 6682,95 1462.77 4530.35 2.99 -0,97 2,83 5979833.76 587838.72 N 70.35472959 W 149,28669032 9043.12 89.45 118.97 4452.67 4531.37 2562.00 6715.47 1447.53 4559,07 7,20 -3,69 6,18 5979818,83 587867,61 N 70,35468788 W 149.28645719 9072.47 88.93 121.32 4453.09 4531,79 2590,91 6744.82 1432.79 4584.45 8.20 -1.77 8,01 5979804,38 587893,14 N 70,35464758 W 149.28625122 9103,90 88.62 121.17 4453.76 4532,46 2621,97 6776,24 1416.49 4611,31 1,10 -0,99 -0.48 5979788.38 587920.18 N 70.35460301 W 149,28603316 9135.83 88.52 122,01 4454.55 4533.25 2653,54 6808,16 1399,77 4638,50 2.65 -0.31 2,63 5979771,97 587947.55 N 70.35455728 W 149,28581247 9165.85 88.11 121 ,39 4455.44 4534,14 2683,24 6838,17 1384.00 4664.03 2.48 -1,37 -2,07 5979756.48 587973.26 N 70,35451416 W 149.28560526 9197.24 88.18 120,73 4456.45 4535.15 2714,23 6869,54 1367.81 4690,91 2,11 0,22 -2,10 5979740.60 588000.31 N 70,35446990 W 149,28538712 9227,70 88,21 121,37 4457.41 4536,11 2744,30 6899,99 1352.11 4716.99 2,10 0.10 2.10 5979725.19 588026.56 N 70,35442695 W 149,28517542 9258.03 88,35 119.56 4458.32 4537,02 2774.20 6930.30 1336.74 4743,12 5,98 0.46 -5,97 5979710,11 588052.86 N 70.35438492 W 149,28496334 9290,81 89.48 118,69 4458.94 4537.64 2806,38 6963.07 1320.79 4771.75 4.35 3.45 -2,65 5979694.48 588081.66 N 70,35434129 W 149,28473097 9322.07 91,91 118.70 4458,57 4537,27 2837,03 6994,33 1305.78 4799,17 7,77 7,77 0,03 5979679,78 588109.24 N 70.35430024 W 149.28450843 9352,82 93.46 118,53 4457.12 4535.82 2867,14 7025.05 1291,07 4826,13 5,07 5,04 -0,55 5979665,37 588136,36 N 70.35426001 W 149,28428958 9384,91 93.53 118,02 4455.17 4533,87 2898,51 7057.08 1275.90 4854,34 1,60 0,22 -1,59 5979650.52 588164.73 N 70,35421851 W 149.28406062 9415,98 93,12 119.08 4453,37 4532,07 2928,91 7088.09 1261,08 4881,58 3,65 -1,32 3.41 5979636,00 588192.14 N 70.35417796 W 149.28383948 9447,21 91.54 118,80 4452,10 4530.80 2959.53 7119.30 1245.98 4908,89 5.14 -5,06 -0,90 5979621,20 588219.61 N 70,35413667 W 149.28361785 9478,09 88.90 117.63 4451,98 4530,68 2989.75 7150.17 1231,38 4936,10 9,35 -8.55 -3.79 5979606.91 588246,98 N 70,35409674 W 149,28339701 9508,98 88.45 118,77 4452,69 4531.39 3019,98 7181.06 1216.79 4963,31 3,97 -1.46 3,69 5979592,62 588274,35 N 70,35405682 W 149,28317611 9539,86 88,31 118.48 4453,57 4532.27 3050.25 7211,92 1202.00 4990.41 1,04 -0.45 -0,94 5979578,14 588301.61 N 70,35401637 W 149,28295620 9571,27 87,73 118,50 4454,65 4533,35 3081.00 7243,31 1187,02 5018,00 1,85 -1,85 0,06 5979563.47 588329,36 N 70,35397542 W 149.28273227 9601,53 87.49 119,29 4455,91 4534,61 3110.67 7273,55 1172.42 5044.47 2,73 -0,79 2,61 5979549,16 588355,99 N 70,35393546 W 149,28251743 9632.69 87,32 118,67 4457,32 4536,02 3141.23 7304,68 1157.33 5071.70 2,06 -0,55 -1,99 5979534,38 588383,38 N 70.35389421 W 149,28229642 9663,94 87.59 119.37 4458,71 4537.41 3171,87 7335,90 1142,19 5099,00 2.40 0,86 2.24 5979519.55 588410,84 N 70,35385278 W 149,28207485 9694,77 87,18 119,20 4460,12 4538,82 3202,13 7366,69 1127,12 5125,86 1.44 -1,33 -0.55 5979504.78 588437.87 N 70,35381158 W 149.28185684 9726,19 87,12 119,27 4461,68 4540,38 3232,96 7398,07 1111,80 5153,24 0,29 -0,19 0,22 5979489,76 588465.42 N 70,35376965 W 149,28163458 9757,56 87,18 119,39 4463,24 4541,94 3263,75 7429.40 1096.45 5180,56 0,43 0.19 0.38 5979474,72 588492.90 N 70,35372768 W 149,28141290 9788,29 87,15 119,71 4464,76 4543.46 3293,94 7460.10 1081,31 5207.26 1,04 -0.10 1,04 5979459.88 588519,76 N 70,35368627 W 149,28119619 9819,56 87,94 120,06 4466,10 4544,80 3324,69 7491,34 1065,75 5234,34 2,76 2,53 1,12 5979444.62 588547,02 N 70,35364370 W 149,28097636 9850,87 89,51 121.40 4466,80 4545,50 3355,58 7522,64 1049,75 5261,25 6,59 5,01 4.28 5979428.93 588574.10 N 70,35359995 W 149,28075800 9881,79 90.27 120,86 4466,86 4545.56 3386.13 7553.56 1033,77 5287,72 3,02 2.46 -1,75 5979413,24 588600,74 N 70.35355623 W 149,28054320 9912,65 89,21 120.25 4467,00 4545,70 3416,57 7584.42 1018.08 5314,29 3,96 -3.43 -1,98 5979397.85 588627.48 N 70,35351332 W 149,28032752 9943,81 88.72 120.59 4467.56 4546.26 3447,29 7615,57 1002.31 5341,16 1,91 -1.57 1,09 5979382,38 588654,52 N 70,35347017 W 149,28010949 9974,53 88,52 120,96 4468,30 4547,00 3477,61 7646,28 986,59 5367.54 1,37 -0,65 1,20 5979366,96 588681,08 N 70,35342719 W 149,27989534 10006,59 88,79 120,70 4469,05 4547,75 3509,25 7678,34 970,17 5395.07 1,17 0,84 -0,81 5979350,84 588708.78 N 70,35338226 W 149.27967199 10037,57 88.55 121,61 4469,77 4548.47 3539,85 7709.31 954.14 5421,57 3,04 -0.77 2,94 5979335,12 588735.46 N 70,35333844 W 149,27945688 10068,33 87,29 119,89 4470,89 4549,59 3570.19 7740,05 938.43 5447,99 6,93 -4,10 -5,59 5979319,70 588762,04 N 70,35329545 W 149,27924250 1 0099.46 86.46 119,55 4472,58 4551,28 3600,77 7771,13 923.02 5474,98 2,88 -2,67 -1,09 5979304.59 588789,20 N 70,35325330 W 149,27902342 10130.47 87,87 121,70 4474,12 4552,82 3631.33 7802,10 907,24 5501,63 8,28 4,55 6,93 5979289,11 588816.03 N 70,35321015 W 149,27880715 10161,25 88,69 121,12 4475,04 4553,74 3661.75 7832.87 891,21 5527.89 3,26 2,66 -1,88 5979273,37 588842,46 N 70,35316629 W 149.27859406 10192,30 89,68 119,99 4475.48 4554,18 3692,38 7863,91 875.42 5554,62 4,84 3,19 -3.64 5979257,89 588869,36 N 70,35312312 W 149,27837709 SurveyEditor Ver 3.1 RT-SP3,03-HF4,00 Bld( do31 rt-546 ) N-U\L-201\L-201 L2\L-201 L2 Generated 5/5/2004 1 :01 PM Page 3 of 5 ') ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Departure (It ) (deg) (deg) (It ) (It ) (It ) (It ) (It ) (ft ) (deg/100 ft) (deg/100 ft) ( deg/100 ft ) (ftUS) (ftUS) 10223.23 89.58 119.92 4475,68 4554,38 3722,83 7894,84 859,98 5581 .42 0,39 -0,32 -0.23 5979242.74 588896,33 N 70,35308087 W 149.27815961 10254.75 89.10 120,20 4476,05 4554.75 3753,88 7926,36 844,19 5608,70 1,76 -1,52 0,89 5979227,26 588923,78 N 70,35303769 W 149,27793823 10285,04 90,30 121.54 4476,20 4554,90 3783,78 7956,65 828,65 5634,70 5,94 3,96 4.42 5979212,01 588949,94 N 70,35299518 W 149.27772725 10316,50 91.13 122,27 4475,81 4554,51 3814,92 7988,11 812,03 5661 .40 3,51 2.64 2,32 5979195.69 588976,83 N 70,35294970 W 149.27751054 10346.85 91.02 121,70 4475,24 4553.94 3844,97 8018.45 795,95 5687,14 1,91 -0,36 -1.88 5979179,90 589002.74 N 70,35290574 W 149.27730167 10378,50 90.68 121,37 4474,77 4553.47 3876,27 8050,10 779.40 5714.11 1,50 -1.07 -1,04 5979163,65 589029,90 N 70.35286047 W 149,27708278 10409,36 90.75 122,62 4474,39 4553,09 3906,83 8080,96 763.05 5740,28 4,06 0,23 4,05 5979147,60 589056.24 N 70,35281575 W 149,27687041 10439,88 90.61 122,52 4474.02 4552,72 3937.09 8111.47 746,62 5766.00 0,56 -0.46 -0,33 5979131.46 589082,14 N 70,35277081 W 149,27666171 10470,89 90,16 121,85 4473,82 4552,52 3967,81 8142.48 730,11 . 5792,24 2,60 -1.45 -2,16 5979115,24 589108,56 N 70,35272563 W 149,27644875 10502.40 89.69 122,16 4473,86 4552.56 3999,02 8H3,99 713.41 5818,97 1,79 -1 .49 0.98 5979098,83 589135.47 N 70,35267995 W 149.27623191 10533.02 88.76 123.05 4474.27 4552,97 4029,38 8204.61 696,91 5844,76 4,20 -3.04 2.91 5979082,63 589161.44 N 70,35263483 W 149.27602262 10564,03 89.14 127.49 4474,84 4553.54 4060,27 8235,61 679.01 5870,06 14.37 1,23 14.32 5979065.01 589186,94 N 70,35258588 W 149.27581726 10595.33 89.68 127.73 4475,16 4553.86 4091,54 8266,91 659.91 5894,86 1,89 1,73 0,77 5979046,19 589211.94 N 70,35253364 W 149.27561609 10627.04 89.34 127.39 4475.43 4554,13 4123,22 8298,62 640,58 5919,99 1,52 -1,07 -1,07 5979027.14 589237,29 N 70,35248078 W 149,27541214 10658,20 88.90 128,03 4475.91 4554,61 4154,35 8329,78 621,52 5944.64 2.49 -1.41 2.05 5979008,36 589262,14 N 70.35242867 W 149.27521215 10690,14 89,55 129,37 4476,34 4555.04 4186,28 8361.71 601.56 5969.57 4,66 2,04 4,20 5978988.68 589287,29 N 70,35237406 W 149,27500993 10721,53 90.27 131.51 4476.39 4555.09 4217,67 8393,10 581.19 5993.45 7.19 2,29 6.82 5978968,58 589311 .40 N 70.35231839 W 149.27481611 10751,59 90,10 131,53 4476.30 4555,00 4247,72 8423.16 561,27 6015.96 0,57 -0,57 0,07 5978948.91 589334.12 N 70.35226390 W 149,27463352 10782,38 88.45 131,95 4476.69 4555,39 4278.49 8453,95 540,77 6038.93 5.53 -5,36 1,36 5978928.67 589357,32 N 70.35220786 W 149,27444715 10814,35 86.29 129,92 4478,15 4556.85 4310.42 8485,88 519,85 6063.06 9,27 -6,76 -6,35 5978908,02 589381.67 N 70,35215065 W 149,27425144 10845,11 83,88 132,02 4480.79 4559.49 4341,06 8516,53 499,76 6086,19 10.37 -7.83 6,83 5978888.19 589405,03 N 70.35209571 W 149,27406372 10876,17 83.54 131,13 4484,19 4562,89 4371,92 8547.40 479,27 6109,29 3,05 -1,09 -2,87 5978867.97 589428.35 N 70,35203969 W 149,27387636 10907,24 83,74 131.16 4487,63 4566,33 4402,79 8578,28 458,95 6132,54 0,65 0,64 0.10 5978847,91 589451,82 N 70.35198413 W 149.27368771 10937,75 83,68 131.58 4490,98 4569,68 4433.11 8608.61 438,91 6155,30 1,38 -0,20 1,38 5978828,12 589474,80 N 70,35192933 W 149.27350307 10968,51 83,60 130.74 4494,38 4573.08 4463,67 8639,18 418.79 6178,32 2,73 -0,26 -2,73 5978808,26 589498.04 N 70,35187431 W 149,27331635 11000,26 83,70 131.72 4497,90 4576,60 4495,22 8670.73 397,99 6202,05 3.08 0,31 3,09 5978787,73 589522,00 N 70,35181744 W 149.27312383 11030.10 82.88 132.52 4501,38 4580.08 4524.83 8700,37 378.12 6224,03 3,83 -2,75 2,68 5978768,10 589544.19 N 70.35176309 W 149,27294551 11060,81 82,81 133.25 4505,21 4583,91 4555,27 8730.84 357,38 6246,36 2,37 -0,23 2,38 5978747,62 589566.75 N 70,35170639 W 149.27276439 11093,11 86,32 135.55 4508,27 4586,97 4587,32 8762,99 334,89 6269.32 12,97 10.87 7.12 5978725,38 589589.96 N 70,35164489 W 149.27257808 11123,24 87.59 136,36 4509,87 4588.57 4617.24 8793,08 313.26 6290,24 5,00 4.22 2,69 5978703.99 589611.12 N 70.35158576 W 149,27240841 11156,00 88.14 136,93 4511,09 4589.79 4649,76 8825.81 289.46 6312.71 2.42 1.68 1.74 5978680.44 589633,85 N 70,35152068 W 149.27222612 11186,56 91.40 137.49 4511,21 4589,91 4680,07 8856.37 267.04 6333.47 10,82 10.67 1,83 5978658,25 589654,85 N 70.35145937 W 149,27205777 11216,83 92,67 134.73 4510.14 4588,84 4710,15 8886.62 245.24 6354.44 10.03 4.20 -9,12 5978636,69 589676,06 N 70.35139977 W 149.27188767 11248.29 92.16 132.68 4508,81 4587,51 4741,51 8918.05 223,52 6377.16 6.71 -1,62 -6,52 5978615,23 589699,02 N 70.35134039 W 149,27170337 11280,02 92.94 128,57 4507.40 4586,10 4773.20 8949.75 202,89 6401,22 13,17 2.46 -12.95 5978594,87 589723.30 N 70.35128397 W 149,27150824 11310.85 91.54 127.38 4506,19 4584,89 4803.99 8980.55 183,93 6425,50 5,96 -4,54 -3,86 5978576.19 589747.79 N 70,35123213 W 149,27131123 11341,87 91.06 128.37 4505.49 4584,19 4834,98 9011.57 164,89 6449,98 3,55 -1.55 3.19 5978557.42 589772.48 N 70.35118005 W 149,27111264 11372.69 91.19 128,88 4504,88 4583.58 4865.78 9042,38 145,66 6474.05 1,71 0.42 1,65 5978538.46 589796,76 N 70,35112745 W 149,27091734 11404,34 90,34 128,04 4504.46 4583,16 4897.42 9074,03 125,97 6498,83 3,78 -2,69 -2.65 5978519,05 589821.76 N 70,35107362 W 149,27071630 11434,35 90.92 128.79 4504.13 4582,83 4927.42 9104.04 107,33 6522,34 3,16 1.93 2.50 5978500,67 589845.47 N 70.35102263 W 149.27052556 11465.92 92.43 131,27 4503,21 4581,91 4958,97 9135,59 87,03 6546.50 9.19 4,78 7.86 5978480,65 589869,86 N 70,35096713 W 149,27032956 11497.03 91.98 133.43 4502,01 4580,71 4990,03 9166.68 66,09 6569.48 7,09 -1.45 6,94 5978459,97 589893.06 N 70,35090986 W 149.27014321 11528.20 91,74 134.64 4501,00 4579,70 5021,10 9197,83 44.44 6591,87 3,96 -0,77 3.88 5978438,57 589915,69 N 70.35085065 W 149,26996155 11559.77 91.16 135.00 4500,20 4578,90 5052,55 9229,39 22.19 6614,26 2.16 -1,84 1.14 5978416,57 589938,32 N 70.35078982 W 149,26977998 11590,62 91.81 134.26 4499.40 4578,10 5083.29 9260,23 0.53 6636,21 3.19 2,11 -2.40 5978395,15 589960,51 N 70,35073058 W 149.26960196 11622,01 92,43 134,45 4498,24 4576,94 5114,57 9291,60 -21.40 6658,64 2.07 1,98 0.61 5978373.48 589983,18 N 70.35067062 W 149,26942004 11653,65 92.43 133.82 4496,90 4575,60 5146.10 9323,21 -43.41 6681,32 1.99 0.00 -1,99 5978351.72 590006.10 N 70,35061043 W 149.26923602 11685.79 92,02 1 33.40 4495,65 4574.35 5178,15 9355,33 -65,57 6704,58 1,83 -1,28 -1.31 5978329.83 590029,60 N 70.35054985 W 149,26904741 11714,92 90.78 132,17 4494,94 4573,64 5207.23 9384.45 -85,35 6725,95 5,99 -4,26 -4,22 5978310,29 590051,19 N 70.35049577 W 149,26887406 11746,56 87,83 130,57 4495,32 4574,02 5238,86 9416,08 -106,25 6749,69 10,61 -9,32 -5,06 5978289,65 590075.16 N 70.35043859 W 149,26868150 11778,71 85,08 131,92 4497,31 4576.01 5270,94 9448,17 -127.41 6773,81 9.52 -8,55 4,20 5978268,77 590099,51 N 70,35038075 W 149,26848581 11808.50 84,84 132.83 4499,93 4578,63 5300,59 9477,84 -147.41 6795,73 3.15 -0,81 3,05 5978249.02 590121.65 N 70,35032605 W 149,26830799 11839.67 85,22 132,16 4502,63 4581.33 5331,61 9508,89 -168,38 6818,63 2.46 1,22 -2,15 5978228,30 590144,78 N 70.35026869 W 149,26812228 11870.35 84,64 131,86 4505,34 4584,04 5362,15 9539.45 -188,83 6841,34 2.13 -1,89 -0,98 5978208,10 590167,71 N 70.35021276 W 149,26793810 11901,17 85,33 133.03 4508,03 4586,73 5392,82 9570,16 -209.55 6863,99 4,39 2,24 3.80 5978187.64 590190.59 N 70.35015610 W 149,26775434 11934.41 86,12 132,80 4510,51 4589,21 5425,93 9603,30 -232,13 6888,27 2.47 2,38 -0,69 5978165,34 590215,12 N 70,35009438 W 149.26755744 11965,63 85.81 132.73 4512,71 4591.41 5457,03 9634.45 -253.27 6911.13 1,02 -0,99 -0,22 5978144.45 590238,21 N 70,35003655 W 149,26737200 11997,37 85,50 132,32 4515,11 4593,81 5488,65 9666,10 -274,66 6934.46 1,62 -0.98 -1,29 5978123,32 590261,77 N 70,34997805 W 149,26718281 12028,08 84,64 131,22 4517,75 4596.45 5519,23 9696,69 -295,04 6957,28 4,54 -2,80 -3,58 5978103,20 590284,81 N 70,34992232 W 149,26699773 12059,16 85,08 132,10 4520,54 4599,24 5550,17 9727,65 -315.62 6980.40 3,16 1.42 2,83 5978082,88 590308,16 N 70,34986605 W 149,26681015 12090,10 87,94 131,51 4522.42 4601.12 5581,04 9758,53 -336,20 7003.42 9.44 9,24 -1,91 5978062,56 590331.41 N 70,34980976 W 149,26662346 12121,02 89,96 128.34 4522.99 4601,69 5611,95 9789.44 -356,04 7027,12 12,15 6,53 -10,25 5978042,99 590355.33 N 70,34975550 W 149,26643118 12152.42 89,82 127,16 4523,05 4601,75 5643,32 9820,84 -375,26 7051,95 3,78 -0.45 -3,76 5978024,04 590380,36 N 70,34970292 W 149.26622979 12183,21 89,24 126,96 4523,30 4602,00 5674,07 9851.63 -393,82 7076,52 1,99 -1,88 -0,65 5978005.77 590405,14 N 70.34965217 W 149.26603048 12214,26 88.48 126.57 4523.92 4602,62 5705.06 9882,67 -412.40 7101,39 2,75 -2.45 -1,26 5977987.46 590430,21 N 70,34960134 W 149,26582875 12244.29 89,35 128,14 4524,49 4603.19 5735,06 9912,70 -430,62 7125,25 5,98 2,90 5,23 5977969,52 590454,27 N 70,34955151 W 149.26563516 12275,23 89,89 129.75 4524,69 4603,39 5765,99 9943.64 -450,06 7149,32 5.49 1,75 5,20 5977950,34 590478,55 N 70,34949832 W 149,26543998 12307,82 89,21 128,61 4524,95 4603,65 5798,57 9976.22 -470,65 7174,58 4,07 -2,09 -3,50 5977930.04 590504,03 N 70.34944201 W 149.26523508 12338,38 88,21 126,83 4525,63 4604,33 5829,10 10006.78 -489,34 7198,74 6,68 -3,27 -5,82 5977911,62 590528.40 N 70.34939089 W 149,26503906 12369,81 88,93 127,87 4526.42 4605,12 5860.49 10038,19 -508.40 7223.72 4.02 2,29 3,31 5977892,84 590553,59 N 70,34933875 W 149,26483646 12401.41 90,10 129,25 4526,69 4605,39 5892,07 10069,79 -528,10 7248,43 5,73 3,70 4,37 5977873.42 590578,51 N 70.34928488 W 149,26463605 12432,16 90.03 130,18 4526,65 4605.35 5922,82 10100,54 -547,75 7272,08 3,03 -0.23 3,02 5977854,03 590602,38 N 70.34923114 W 149,26444419 SurveyEditor Ver 3,1 RT -SP3,03-HF4,OO Bld( do31 rt-546 ) N-U\L-201\L-201 L2\L-201 L2 Generated 5/5/2004 1 :01 PM Page 4 of 5 ') ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Wal k Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (It) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/1 00 ft ) ( deg/100 It ) (ftUS) (ltUS) 12463,25 89,27 129,14 4526,84 4605,54 5953,91 10131,63 -567,59 7296,02 4.14 -2.44 -3.35 5977834.46 590626.53 N 70,34917687 W 149,26425007 12494.97 89,79 129,01 4527,10 4605,80 5985,63 10163.35 -587.58 7320,64 1,69 1,64 -0.41 5977814.75 590651,37 N 70,34912218 W 149,26405035 12526,07 89,31 128,89 4527,35 4606,05 6016,72 10194.45 -607,13 7344.83 1.59 -1,54 -0.39 5977795,47 590675,77 N 70,34906871 W 149,26385417 12556.34 89,93 128,76 4527,55 4606,25 6046,98 10224,72 -626.11 7368.41 2.09 2,05 -0.43 5977776.76 590699,56 N 70,34901680 W 149,26366290 12587,66 93.60 128,64 4526,58 4605,28 6078,27 1 0256.02 -645.68 7392.83 11,72 11,72 -0,38 5977757,46 590724,20 N 70,34896327 W 149,26346477 12618,23 95.04 126,26 4524,28 4602,98 6108,72 10286.50 -664,21 7417,03 9,08 4,71 -7.79 5977739.20 590748.60 N 70,34891257 W 149,26326850 12649.61 94.25 125.45 4521,74 4600.44 6139,92 10317,78 -682,53 7442,38 3,60 -2,52 -2,58 5977721.16 590774,15 N 70,34886246 W 149.26306288 12680.74 93.77 125.40 4519,56 4598.26 6170,87 10348,83 -700.53 7467,69 1,55 -1,54 -0.16 5977703.45 590799,65 N 70,34881321 W 149,26285762 12711,97 93.19 123,58 4517,67 4596,37 6201,90 10380,00 -718,18 7493,38 6.11 -1,86 -5.83 5977686,08 590825,53 N 70,34876492 W 149,26264921 12742,60 90.92 122.98 4516,57 4595,27 6232.30 10410,61 -734,98 7518.97 7,67 -7.41 -1,96 5977669.58 590851.31 N 70,34871897 W 149.26244164 12775,06 89.27 120,92 4516,51 4595,21 6264.44 10443,07 -752.16 7546.51 8.13 -5.08 -6.35 5977652.71 590879,03 N 70,34867197 W 149,26221823 12806.10 86.53 119,31 4517,65 4596,35 6294,99 10474,09 -767.72 7573.33 10,24 -8,83 -5,19 5977637.45 590906,03 N 70.34862939 W 149.26200058 12837,10 87.32 121,67 4519,31 4598,01 6325,52 10505.04 -783.42 7600,01 8.02 2,55 7,61 5977622,04 590932,87 N 70,34858641 W 149.26178420 12868.84 88.76 123,05 4520.40 4599,10 6356,96 10536.76 -800.40 7626,80 6,28 4,54 4,35 5977605.37 590959,85 N 70,34853995 W 149.26156685 12899.53 86.35 121,25 4521,71 4600.41 6387.33 10567.42 -816,72 7652.76 9,80 -7,85 -5,87 5977589,34 590985,99 N 70,34849531 W 149.26135628 12930,78 85.98 120,92 4523,80 4602,50 6418.13 10598,60 -832.81 7679.46 1,58 -1.18 -1,06 5977573.54 591012,86 N 70,34845125 W 149.26113967 12962.02 86.84 120,25 4525.75 4604.45 6448.89 10629,78 -848.68 7706,30 3.49 2,75 -2,14 5977557.98 591039.88 N 70.34840784 W 149,26092194 12991,90 86.63 120.86 4527.46 4606,16 6478,32 10659,61 -863,84 7731.99 2.16 -0,70 2,04 5977543,10 591065.73 N 70,34836634 W 149,26071354 13022.94 85.29 120.46 4529.64 4608,34 6508.87 10690,58 -879.63 7758,62 4,50 -4,32 -1,29 5977527.61 591092.54 N 70,34832313 W 149,26049748 13053,33 86.73 121,90 4531.76 4610.46 6538,82 10720,89 -895.33 7784,56 6,69 4,74 4,74 5977512,21 591118,64 N 70,34828018 W 149,26028709 13091,95 88,83 120.88 4533.25 4611,95 6576.98 10759.48 -915.43 7817,50 6,04 5.44 -2,64 5977492.48 591151,80 N 70,34822517 W 149,26001988 13122,58 88,83 122.09 4533.88 4612,58 6607.26 10790.10 -931.42 7843,62 3,95 0.00 3,95 5977476.78 591178,09 N 70.34818141 W 149,25980804 13154.46 89,31 122,19 4534.40 4613,10 6638.84 10821,98 -948,38 7870,61 1.54 1.51 0,31 5977460.12 591205,26 N 70,34813500 W 149,25958910 13186,07 89,07 121.34 4534,84 4613,54 6670.12 10853.59 -965,02 7897.48 2,79 -0.76 -2,69 5977443.78 591232.32 N 70,34808947 W 149.25937111 13217.41 89.07 122,24 4535,35 4614,05 6701,13 10884,92 -981,52 7924,11 2,87 0.00 2,87 5977427.58 591259,13 N 70,34804430 W 149,25915506 13248,94 88,18 121.43 4536.11 4614,81 6732,34 10916.44 -998,15 7950.89 3,82 -2.82 -2,57 5977411,25 591286,09 N 70,34799880 W 149,25893784 13278,92 88,32 121.12 4537.02 4615,72 6761.95 10946.41 -1013,71 7976.50 1,13 0.47 -1,03 5977395.98 591311.87 N 70,34795622 W 149.25873009 13311,79 88,05 121.06 4538.07 4616,77 6794.41 10979,26 -1030,67 8004,64 0,84 -0,82 -0,18 5977379,33 591340,19 N 70,34790979 W 149,25850187 13343,00 87.49 121.65 4539,28 4617,98 6825.24 11010,45 -1046,90 8031.27 2.61 -1.79 1.89 5977363.40 591367.00 N 70,34786539 W 149,25828584 13374.33 86.98 121.73 4540.79 4619.49 6856,21 11041,74 -1063,34 8057.90 1,65 -1,63 0.26 5977347,26 591393,80 N 70,34782040 W 149,25806985 13405.34 87,32 121,63 4542,33 4621,03 6886.85 11072.71 -1079.60 8084.25 1.14 1.10 -0.32 5977331,29 591420.34 N 70.34777588 W 149,25785606 13440,36 88,76 121.38 4543,53 4622,23 6921.47 11107,71 -1097.89 8114.09 4.17 4.11 -0.71 5977313,34 591450,38 N 70.34772583 W 149.25761401 13490,00 88.76 121,38 4544,61 4623,31 6970,54 11157,34 -1123,74 8156.46 0.00 0.00 0,00 5977287,97 591493,03 N 70,34765511 W 149.25727033 LeQal Description: NorthlnQ IY) mUSl EastlnQ IX) [ftUS] Surface: 2597 FSL 3588 FEL S34 T12N R11 E UM 5978320,84 583325.34 BHL: 1469 FSL 714 FEL S35 T12N R11 E UM 5977287.97 591493,03 SurveyEditor Ver 3,1 RT-SP3,03-HF4,OO Bld( do31 rt-546 ) N-U\L-201 \L-201 L2\L-201 L2 Generated 5/5/2004 1 :01 PM Page 5 of 5 TREE = FMC 4-1/6" 5M W8..LHEAD = FMC G8\I 5 AGrUÄTOR ;'" KS:....ECEil';;;'··........, ·..····"·..'j's:..:¡Cÿ' äÞ:'äË\/';;;" . 51":g3õ "~<"6p";"""'"''''''''''''''''''''~''''''''''''''' ..,.w.,,""w·.....3'ÕC)' ,~~.~~_~I.~~..·.:~~~..·,~·,~..~!.:~:~·" Datum MD = 6137' "M...",'''''''."".",....,.,....,.,.,...,..,,'''.. nwl'l'."'.....",.",."....................... ... '......n'....,,.,' Datum rvD = 4400' SS I H 20" CONOUGrOR 110-3/4" CSG. 45.5#, L-80, ID = 9.95" l-i 3197' Minimum ID = 3.813" @ 2266' 4-112" HES X NIPPLE 14-112" A-IOENIX DSCHRGE-PRESS SUB,ID = 3.85"1-1 [4-112" A-IOENIX JEr RJMPS8\lSOR, ID = 3.833" I., IRA TAG 1-1 5975' 17 -5/8" X 5-H2" BKR ZXP A<R, ID = 5.75" 1-1 5982' I BKR HUGHES HOOK HGR, ID = 5.64" 1-1 6020' IRA TAG 1-1 6179' 17-5/8" X 5-112" BKR ZXP A<R, 10 = 5.75" I-{ 6173' IBKR HU3HES HOOK HGR, 10 = 5.64" 1-1 6224' IRA TAG 1-1 6324' 17-5/8" X 5-1/2" BKRZXPPKR,ID = 5.75" l-i 6319' IBKR HU3HES HOOK HGR, 10 = 5.64" l-t 6367' ÆRFORA TON SUMMARY REF LOG: ANGLE AT TOP PERF: xx@ xxx x' Note: Refer to Production DB for historical perf data SIZE SFF IN1ERV AL OpnlSqz OA TE 4-1/2" SL TO OA 6090 - 9802 0 04/24/04 4-112" SLTD OBa 6295-13405 0 04/18/04 4-1/2" SLTD OBb 6434 - 13465 0 04/09/04 4-112" SLTD OBd 7028 - 13628 0 04/04104 r 2266' 1-i4-112"HESXNIP,ID=3.813" I ~ GAS LIFT MANDRELS ST MD TVD DEV 1YÆ VLV LATCH FORT DATE 4 2370 2101 46 KBG-2 DMY BK-5 0 04/23/04 3 3525 2857 50 KBG-2 DMY BK-5 0 04/23/04 2 4680 3612 49 KBG-2 DMY BK-5 0 04/23/04 1 5708 4272 57 KBG-2 00<2 BEK 04/23/04 1 5825' 1-14-1/2" BKR CMD SLIDING SLV , ID = 3.812" I "Ç7' ~ 5873' 1-t7-5/8" X 4-1/2" BKR FREM A<R,ID = 3.875" I ~ 5942' 1-i4-112"HESXNIP,ID=3.813" I ~ ~ -----l 5963' 1-i4-1/2" HES X NIP, ID = 3.813" I ~r ~ 6000' H4-1/2"BKRSEALASSErvELY I ~ ~ 6001' H5-1/2" X4-1/2"XO, ID= 3.960"1 I-----It ----------------J ~ ~ ---------------- ) L-201 L-201 L 1 L-201 L2 L-201 L3 ~ 114' I ~ I 5814' L ¡/I I~ 5849' ~ :=¡ ~ ~ z 17-5/8"CSG,29.7#, L-80,ID= 6.875" H 7047' ~ ~ 13672' D6.1E REv' BY COM~NTS 05104104 TWA/KA~ ORIGINAL COMPLErION DATE REV BY ') I SAFETY NOTES: 7 -5/8" WINDOW @ 6025' 6020' - 9846' 6-3/4" OALATERAL, 10 = 3.958" IV~. 6200' 1-t4-1/2" BKR SEAL ASSEMBLY I ~_ __ __6-_2~_7-_' __ __~_5-_-1-_/2~_'X-_~_1~_'~_XJO' 10 =3.960"1 7-5/8" WINOOW @ 6229' ~ 6224' -13448' 6-3/4" OBa LATERAL, 10 = 3.958" ~ 6346' H4-1/2"BKRSEALASSErvELY I r ~_ _6~~3~ _ ~5~1~'~X_4~1~'~X~,~D =3.960"1 ] 7-5/8"WINOOW@ 6372' ~, ----------------- 6367' - 13506' 6-3/4" OBb LATERAL, 10 = 3.958" z-t I I ~ 6922' H 1-t7-5/8" X 5-1/2" BKRZXP LNRTOP PKR, ID =4.840" 1-t4-1 12" BKRSEAL ASSEMBLY I H5-1/2" X 4-112" XO, ID= 3.980" I RA TAG I 6432' 6476' 6481' ~ 6432' - 13672' 6-3/4" OBd LATERAL, 10 = 3.958" COM~NTS ORION UNIT WB..L: L-201, L-201 L 1, L-201 L2, L-201 L3 ÆRMIT No: 204046 (047) (048) (049) AA No: 50-029-23202-00 (60) (61) (62) SEC 34, T12N, R11 E, 2598' NSL & 3588' WB.. BP Exploration (Alaska) SCHLUMBERGER Survey report Client............... ....: BP Exploration Inc. Field. . . . . . . . . . . . . . . . . . . .: Orion Well. . . . . . . . . . . . . . . . . . . . .: L201L2 API number. .., ... ........: 50-029-23202-61 Engineer... ......... .....: St. Amour COUNTY: .... .......... ....: Nabors 9ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS..... ......: Mason & Taylor ----- Depth reference ----------------------- Permanent datum...... ....: Mean Sea Level Depth reference...... ....: Driller's Pipe Tally GL above permanent. ......: 50.20 ft KB above permanent..... ..: NjA (Top Drive) DF above permanent.... ...: 78.70 ft ----- Vertical section origin---------------- Latitude (+NjS-).... .....: 0.00 ft Departure (+EjW-)... .....: 0.00 ft ----- Platform reference point--------------- Latitude (+NjS-)... .... ..: -999.25 ft Departure (+EjW-). .......: -999.25 ft Azimuth from rotary table to target: 130.00 degrees 19-Apr-2004 10:24:01 Spud date.. .... ... ..... ..: Last survey date.........: Total accepted surveys...: MD of first survey... ....: MD of last survey........: Page 1 of 12 1-Mar-04 19-Apr-04 302 0.00 ft 13490.00 ft ----- Geomagnetic data ---------------------- Magnetic model. ..........: BGGM version 2003 Magnetic date.. ...... ....: 12-Apr-2004 Magnetic field strength. . : 1151.25 HCNT Magnetic dec (+EjW-).....: 25.00 degrees Magnetic dip.. ...........: 80.82 degrees ----- MWD survey Reference Reference G..............: Reference H..............: Reference Dip............: Tolerance of G... ........: Tolerance of H. ..........: Tolerance of Dip.. .......: Criteria --------- 1002.68 mGal 1151. 25 HCNT 80.82 degrees (+j-) 2.50 mGal (+j-) 6.00 HCNT (+j-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+EjW-).....: 25.00 degrees Grid convergence (+EjW-).: 0.00 degrees Total az corr (+EjW-)....: 25.00 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction ,~ ~ / )-- -0 e C); e SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 2 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYRO None 3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYRO None 4 324.00 2.13 19.40 100.00 323.97 -1.57 2.37 -0.05 2.38 358.72 1. 76 GYRO None 5 395.00 4.15 21. 01 71.00 394.86 -2.87 6.02 1.31 6.16 12.25 2.85 GYRO None 6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYRO None e 7 595.00 8.86 11.46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYRO None 8 695.00 11.87 12.48 100.00 691. 99 -20.13 44.33 10.92 45.65 13.83 3.02 GYRO None 9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG 10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21. 32 86.02 14.35 3.12 MWD GMAG 11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115.96 14.89 2.38 MWD GMAG 12 1040.82 22.84 16.89 93.36 1021.28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG 13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG 14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG 15 1321.50 29.42 18.07 95.37 1272.00 -111. 15 264.57 76.90 275.52 16.21 1. 53 MWD GMAG 16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91. 86 323.53 16.49 1. 77 MWD GMAG 17 1511.08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1. 83 MWD GMAG 18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG 19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG 20 1797.56 36.27 18.62 98.02 1671.38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG 21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591. 00 17.60 0.97 MWD GMAG e 22 1988.07 39.87 19 .15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG 23 2081.93 41.57 20.11 93.86 1893.38 -267.74 677.09 218.63 711. 51 17.90 1. 93 MWD GMAG 24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG 25 2269.96 45.03 20.88 94.18 2030.82 -311.34 797.53 262.78 839.71 18.24 2.56 MWD GMAG 26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG 27 2458.33 47.95 21. 23 96.59 2161.62 -355.21 923.95 311.59 975.08 18.64 2.54 MWD GMAG 28 2552.24 48.94 21. 51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG 29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG 30 2740.10 50.69 21.63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 3 at 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (de g) (ft) (ft) (ft) (ft) (ft) (ft) (deg) lOOt) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 2834.26 50.10 21.09 94.16 2405.24 -446.33 1190.40 416.22 1261.07 19.27 0.77 MWD GMAG 32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG 33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG 34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG 35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501. 52 19.80 0.67 MWD GMAG 36 3266.50 47.43 25.10 114.34 2688.89 -541.75 1490.59 543.55 1586.61 20.03 1.92 MWD GMAG e 37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561.57 1630.69 20.14 4.16 MWD GMAG 38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG 39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG 40 3609.16 49.34 23.32 93.81 2911.68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG 41 3701.35 50.03 21. 52 92.19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1.67 MWD GMAG 42 3794.96 50.31 21. 39 93.61 3031.29 -659.14 1860.94 701.06 1988.61 20.64 0.32 MWD GMAG 43 3888.81 50.23 21.33 93.85 3091.27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG 44 3982.46 49.83 20.65 93.65 3151. 43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG 45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG 46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277.18 20.66 0.55 MWD GMAG 47 4266.06 48.39 21.00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG 48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG 49 4454.28 47.80 22.75 94.27 3461.74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG 50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG 51 4641.89 48.96 31.87 93.78 3586.62 -853.25 2451.68 943.36 2626.91 21.05 4.03 MWD GMAG e 52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21. 38 3.58 MWD GMAG 53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21.82 3.66 MWD GMAG 54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG 55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG 56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG 57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG 58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG 59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG 60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451.92 3156.80 27.38 5.64 MWD GMAG SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 4 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/w- displ Azim (degl tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG 62 5677.97 56.15 89.22 95.09 4255.06 -581.22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG 63 5769.98 58.26 91. 53 92.01 4304.90 -521.65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG 64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG 65 5955.46 61. 37 98.97 93.30 4399.26 -390.85 2802.35 1841. 23 3353.10 33.31 4.62 MWD GMAG 66 6049.62 64.61 102.59 94.16 4442.03 -317.64 2786.62 1923.60 3386.08 34.62 4.85 MWD GMAG e 67 6143.03 65.95 107.59 93.41 4481.11 -240.71 2764.52 2005.48 3415.34 35.96 5.07 MWD GMAG 68 6229.00 68.41 110.67 85.97 4514.46 -166.68 2738.54 2080.32 3439.10 37.22 4.37 TOP OF WINDOW 69 6241. 00 70.32 110.46 12.00 4518.69 -156.09 2734.60 2090.84 3442.33 37.40 16.00 BOTTOM WINDOW 70 6248.82 70.86 110.87 7.82 4521.29 -149.13 2732.00 2097.74 3444.46 37.52 8.49 MWD Incl. Only 71 6280.05 74.34 112.47 31. 23 4530.63 -120.85 2720.99 2125.43 3452.71 37.99 12.17 MWD Incl. Only 72 6311.72 78.37 114.05 31. 67 4538.10 -91. 38 2708.84 2153.69 3460.66 38.49 13.62 MWD Incl. Only 73 6342.77 82.86 115.55 31. 05 4543.16 -61.83 2695.99 2181.49 3468.04 38.98 15.23 MWD Incl. Only 74 6373.77 87.77 11 7.02 31. 00 4545.69 -31.82 2682.31 2209.19 3474.95 39.48 16.53 MWD Incl. Only 75 6404.96 91. 54 118.49 31.19 4545.88 -1.35 2667.79 2236.78 3481. 42 39.98 12.97 MWD Incl. Only 76 6436.66 93.43 119.98 31.70 4544.50 29.76 2652.32 2264.42 3487.46 40.49 7.59 MWD GMAG 77 6467.17 92.51 121. 35 30.51 4542.92 59.83 2636.78 2290.62 3492.79 40.98 5.40 MWD Incl. Only 78 6498.86 91.78 122.78 31.69 4541.74 91.19 2619.97 2317.46 3497.84 41. 49 5.06 MWD GMAG 79 6529.76 91.98 122.67 30.90 4540.72 121.83 2603.28 2343.44 3502.68 41.99 0.74 MWD GMAG 80 6560.75 91.81 122.83 30.99 4539.70 152.55 2586.52 2369.49 3507.79 42.49 0.75 MWD GMAG 81 6591. 97 92.70 123.94 31.22 4538.47 183.54 2569.35 2395.54 3512.86 42.99 4.55 MWD GMAG e 82 6622.94 91.47 122.58 30.97 4537.34 214.27 2552.38 2421.42 3518.23 43.49 5.92 MWD GMAG 83 6654.79 88.79 124.93 31. 85 4537.27 245.93 2534.69 2447.89 3523.75 44.00 11.19 MWD GMAG 84 6685.75 89.62 123.41 30.96 4537.70 276.73 2517.30 2473.51 3529.17 44.50 5.59 MWD GMAG 85 6716.49 91.43 125.79 30.74 4537.42 307.32 2499.85 2498.80 3534.58 44.99 9.73 MWD GMAG 86 6748.09 91.88 125.69 31.60 4536.51 338.82 2481.40 2524.44 3539.79 45.49 1.46 MWD GMAG 87 6778.86 92.32 125.04 30.77 4535.38 369.47 2463.60 2549.52 3545.33 45.98 2.55 MWD GMAG 88 6809.61 91.88 124.18 30.75 4534.25 400.07 2446.15 2574.81 3551. 52 46.47 3.14 MWD GMAG 89 6841.48 91.02 124.41 31. 87 4533.44 431. 77 2428.20 2601.13 3558.37 46.97 2.79 MWD GMAG 90 6872.68 89.75 124.25 31. 20 4533.24 462.81 2410.60 2626.89 3565.33 47.46 4.10 MWD GMAG SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 5 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 6903.03 90.78 124.72 30.35 4533.10 493.02 2393.42 2651.91 3572.26 47.93 3.73 MWD GMAG 92 6934.85 90.20 123.00 31.82 4532.82 524.66 2375.69 2678.33 3580.13 48.43 5.70 MWD GMAG 93 6966.15 89.51 123.07 31. 30 4532.90 555.73 2358.63 2704.57 3588.57 48.91 2.22 MWD GMAG 94 6996.79 90.40 125.50 30.64 4532.93 586.21 2341.37 2729.89 3596.43 49.38 8.45 MWD GMAG 95 7027.89 90.75 126.05 31.10 4532.61 617.23 2323.19 2755.12 3603.87 49.86 2.10 MWD GMAG 96 7058.05 90.68 125.62 30.16 4532.24 647.30 2305.53 2779.56 3611. 30 50.33 1.44 MWD GMAG e 97 7088.89 90.58 125.09 30.84 4531. 90 678.04 2287.69 2804.72 3619.39 50.80 1. 75 MWD GMAG 98 7120.17 90.71 125.09 31. 28 4531.55 709.20 2269.71 2830.31 3627.98 51. 27 0.42 MWD GMAG 99 7151. 57 90.95 125.18 31. 40 4531.09 740.49 2251. 64 2855.98 3636.83 51.75 0.82 MWD GMAG 100 7182.56 90.82 126.27 30.99 4530.61 771.39 2233.55 2881.14 3645.50 52.22 3.54 MWD GMAG 101 7213.70 90.92 125.44 31.14 4530.14 802.44 2215.31 2906.38 3654.40 52.68 2.68 MWD GMAG 102 7245.02 90.78 125.96 31.32 4529.68 833.67 2197.03 2931.81 3663.67 53.15 1.72 MWD GMAG 103 7276.03 90.51 126.98 31. 01 4529.33 864.62 2178.60 2956.74 3672.69 53.62 3.40 MWD GMAG 104 7307.25 90.30 125.32 31. 22 4529.11 895.77 2160.19 2981.95 3682.18 54.08 5.36 MWD GMAG 105 7338.59 91. 50 125.50 31. 34 4528.61 927.00 2142.03 3007.49 3692.33 54.54 3.87 MWD GMAG 106 7369.09 92.94 123.50 30.50 4527.43 957.33 2124.77 3032.60 3702.88 54.98 8.08 MWD GMAG 107 7401.26 92.05 121.30 32.17 4526.03 989.19 2107.55 3059.74 3715.34 55.44 7.37 MWD GMAG 108 7431.83 92.81 119.69 30.57 4524.74 1019.31 2092.05 3086.06 3728.33 55.87 5.82 MWD GMAG 109 7462.82 92.77 118.64 30.99 4523.23 1049.71 2076.97 3113.08 3742.34 56.29 3.39 MWD GMAG 110 7493.89 92.60 118.24 31.07 4521.77 1080.12 2062.19 3140.37 3756.94 56.71 1.40 MWD GMAG 111 7524.87 92 .12 119.42 30.98 4520.50 1110.49 2047.26 3167.49 3771.51 57.12 4.11 MWD GMAG e 112 7555.40 92.77 119.58 30.53 4519.19 1140.48 2032.24 3194.04 3785.75 57.53 2.19 MWD GMAG 113 7586.23 92.87 119.27 30.83 4517.68 1170.75 2017.11 3220.86 3800.35 57.94 1. 06 MWD GMAG 114 7616.72 91.78 119.82 30.49 4516.44 1200.71 2002.09 3247.36 3814.94 58.34 4.00 MWD GMAG 115 7648.68 91.50 120.56 31.96 4515.53 1232.18 1986.03 3274.98 3830.11 58.77 2.47 MWD GMAG 116 7678.75 91.30 118.58 30.07 4514.79 1261. 75 1971.19 3301.12 3844.87 59.16 6.62 MWD GMAG 117 7710.19 89.75 116.02 31. 44 4514.50 1292.41 1956.77 3329.05 3861.55 59.55 9.52 MWD GMAG 118 7740.23 89.07 115.88 30.04 4514.81 1321. 55 1943.63 3356.06 3878.25 59.92 2.31 MWD GMAG 119 7770.76 89.10 114.78 30.53 4515.30 1351.08 1930.57 3383.65 3895.67 60.29 3.60 MWD GMAG 120 7801.46 89.44 113.27 30.70 4515.69 1380.59 1918.07 3411.69 3913.90 60.66 5.04 MWD GMAG SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 6 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 121 7832.24 89.51 112.57 30.78 4515.97 1410.02 1906.09 3440.04 3932.82 61. 01 2.29 MWD GMAG 122 7863.07 88.52 112.49 30.83 4516.50 1439.42 1894.28 3468.51 3952.07 61.36 3.22 MWD GMAG 123 7893.97 88.17 111.13 30.90 4517.40 1468.76 1882.80 3497.19 3971.81 61.70 4.54 MWD GMAG 124 7924.35 87.80 111. 31 30.38 4518.46 1497.51 1871.81 3525.49 3991.59 62.03 1. 35 MWD GMAG 125 7954.78 88.62 112.43 30.43 4519.41 1526.41 1860.48 3553.72 4011.27 62.37 4.56 MWD GMAG 126 7985.18 89.17 112.51 30.40 4520.00 1555.39 1848.86 3581.80 4030.83 62.70 1. 83 MWD GMAG e 127 8015.88 89.51 113.01 30.70 4520.35 1584.71 1836.99 3610.11 4050.61 63.03 1. 97 MWD GMAG 128 8046.12 89.51 112 . 14 30.24 4520.61 1613.56 1825.38 3638.03 4070.29 63.35 2.88 MWD GMAG 129 8077.32 89.51 113.36 31. 20 4520.88 1643.36 1813.32 3666.80 4090.67 63.69 3.91 MWD GMAG 130 8107.85 88.76 110.70 30.53 4521. 34 1672.39 1801. 87 3695.10 4111. 02 64.00 9.05 MWD GMAG 131 8137.95 88.35 109.61 30.10 4522.10 1700.70 1791. 50 3723.35 4131.92 64.31 3.87 MWD GMAG 132 8170.69 88.38 110.15 32.74 4523.03 1731.43 1780.37 3754.12 4154.89 64.63 1. 65 MWD GMAG 133 8201.08 88.28 110.01 30.39 4523.92 1759.98 1769.94 3782.65 4176.26 64.92 0.57 MWD GMAG 134 8230.81 88.90 110.50 29.73 4524.65 1787.96 1759.65 3810.53 4197.21 65.21 2.66 MWD GMAG 135 8262.68 88.83 108.83 31.87 4525.28 1817.83 1748.93 3840.54 4220.01 65.52 5.24 MWD GMAG 136 8294.28 88.73 no .19 31. 60 4525.96 1847.43 1738.38 3870.32 4242.80 65.81 4.31 MWD GMAG 137 8323.73 89.48 109.35 29.45 4526.42 1875.06 1728.42 3898.03 4264.04 66.09 3.82 MWD GMAG 138 8355.45 89.55 109.32 31.72 4526.68 1904.74 1717.92 3927.96 4287.20 66.38 0.24 MWD GMAG 139 8387.07 89.41 109.56 31.62 4526.97 1934.34 1707.39 3957.77 4310.36 66.66 0.88 MWD GMAG 140 8417.57 89.14 110.31 30.50 4527.36 1962.99 1696.99 3986.44 4332.61 66.94 2.61 MWD GMAG 141 8448.80 89.03 109.58 31.23 4527.86 1992.32 1686.34 4015.80 4355.50 67.22 2.36 MWD GMAG e 142 8479.96 89.03 110.35 31.16 4528.38 2021.59 1675.71 4045.08 4378.43 67.50 2.47 MWD GMAG 143 8511. 02 89.31 109.94 31.06 4528.83 2050.80 1665.01 4074.24 4401.32 67.77 1. 60 MWD GMAG 144 8542.50 89.14 109.50 31. 48 4529.26 2080.32 1654.39 4103.87 4424.79 68.04 1. 50 MWD GMAG 145 8573.63 89.10 110.24 31.13 4529.74 2109.55 1643.81 4133.14 4448.03 68.31 2.38 MWD GMAG 146 8604.75 89.00 nO.66 31.12 4530.25 2138.87 1632.94 4162.29 4471.15 68.58 1.39 MWD GMAG 147 8636.06 88.96 109.92 31. 31 4530.81 2168.34 1622.08 4191.66 4494.57 68.84 2.37 MWD GMAG 148 8667.42 89.48 111.11 31. 36 4531. 24 2197.90 1611. 09 4221.02 4518.04 69.11 4.14 MWD GMAG 149 8697.97 89.07 114.26 30.55 4531.62 2227.06 1599.31 4249.21 4540.21 69.37 10.40 MWD GMAG 150 8729.75 88.93 115.34 31.78 4532.18 2257.73 1585.98 4278.05 4562.57 69.66 3.43 MWD GMAG SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 7 of 12 -------- ------ ------- ------ -------- -------- ---------------- ----------------- ------ -------- ------ ------- ------ -------- --------- ----------------- ---------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) --------- ------ ------- ------ -------- -------- ----------------- --------------- ------ -------- ------ ------- ------ --------- --------- ---------------- ----------------- ------ 151 8761.18 88.93 115.60 31.43 4532.76 2288.14 1572.47 4306.42 4584.53 69.94 0.83 MWD GMAG 152 8792.70 88.66 115.44 31.52 4533.43 2318.66 1558.89 4334.86 4606.64 70.22 1. 00 MWD GMAG 153 8823.53 88.45 115.21 30.83 4534.21 2348.47 1545.71 4362.72 4628.45 70.49 1. 01 MWD GMAG 154 8854.68 90.23 116.92 31.15 4534.56 2378.70 1532.03 4390.69 4650.30 70.76 7.92 MWD GMAG 155 8885.79 91. 64 115.73 31.11 4534.06 2408.92 1518.23 4418.57 4672.13 71.04 5.93 MWD GMAG 156 8917.62 91. 47 116.20 31.83 4533.19 2439.79 1504.30 4447.18 4694.71 71.31 1. 57 MWD GMAG e 157 8948.92 91.30 116.94 31.30 4532.44 2470.23 1490.31 4475.17 4716.79 71. 58 2.43 MWD GMAG 158 8979.55 90.95 116.08 30.63 4531.83 2500.01 1476.64 4502.57 4738.52 71.84 3.03 MWD GMAG 159 9010.60 90.65 116.96 31. 05 4531.40 2530.20 1462.77 4530.35 4760.65 72.11 2.99 MWD GMAG 160 9043.12 89.45 118.97 32.52 4531.37 2562.00 1447.53 4559.07 4783.35 72.39 7.20 MWD GMAG 161 9072.47 88.93 121. 32 29.35 4531.79 2590.91 1432.79 4584.45 4803.13 72.64 8.20 MWD GMAG 162 9103.90 88.62 121. 17 31. 43 4532.46 2621.97 1416.49 4611.31 4823.97 72.92 1.10 MWD GMAG 163 9135.83 88.52 122.01 31.93 4533.26 2653.55 1399.77 4638.50 4845.11 73.21 2.65 MWD GMAG 164 9165.85 88.11 121. 39 30.02 4534.14 2683.24 1384.00 4664.03 4865.04 73.47 2.48 MWD GMAG 165 9197.24 88.18 120.73 31.39 4535.16 2714.23 1367.81 4690.91 4886.26 73.74 2.11 MWD GMAG 166 9227.70 88.21 121.37 30.46 4536.11 2744.30 1352.11 4716.99 4906.95 74.01 2.10 MWD GMAG 167 9258.03 88.35 119.56 30.33 4537.03 2774.20 1336.74 4743.12 4927.89 74.26 5.98 MWD GMAG 168 9290.81 89.48 118.69 32.78 4537.65 2806.39 1320.79 4771.75 4951.17 74.53 4.35 MWD GMAG 169 9322.07 91.91 118.70 31. 26 4537.27 2837.03 1305.78 4799.17 4973.64 74.78 7.77 MWD GMAG 170 9352.82 93.46 118.53 30.75 4535.83 2867.15 1291. 07 4826.13 4995.84 75.02 5.07 MWD GMAG 171 9384.91 93.53 118.02 32.09 4533.87 2898.51 1275.90 4854.34 5019.22 75.27 1. 60 MWD GMAG e 172 9415.98 93.12 119.08 31.07 4532.07 2928.91 1261.08 4881.58 5041. 84 75.52 3.65 MWD GMAG 173 9447.21 91. 54 118.80 31. 23 4530.80 2959.53 1245.98 4908.89 5064.55 75.76 5.14 MWD GMAG 174 9478.09 88.90 117.63 30.88 4530.68 2989.76 1231.38 4936.10 5087.37 75.99 9.35 MWD GMAG 175 9508.98 88.45 118.77 30.89 4531.39 3019.99 1216.79 4963.31 5110.29 76.23 3.97 MWD GMAG 176 9539.86 88.31 118.48 30.88 4532.27 3050.25 1202.00 4990.41 5133.13 76.46 1. 04 MWD GMAG 177 9571. 27 87.73 118.50 31. 41 4533.35 3081. 01 1187.02 5018.00 5156.48 76.69 1. 85 MWD GMAG 178 9601. 53 87.49 119.29 30.26 4534.61 3110.67 1172.42 5044.47 5178.92 76.92 2.73 MWD GMAG 179 9632.69 87.32 118.67 31.16 4536.02 3141. 23 1157.33 5071.70 5202.07 77.15 2.06 MWD GMAG 180 9663.94 87.59 119.37 31. 25 4537.41 3171.87 1142.19 5099.00 5225.36 77.37 2.40 MWD GMAG SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 8 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --....------------ ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 181 9694.77 87.18 119.20 30.83 4538.82 3202.14 1127.12 5125.86 5248.32 77.60 1.44 MWD GMAG 182 9726.19 87.12 119.27 31.42 4540.38 3232.96 1111. 80 5153.24 5271. 81 77.83 0.29 MWD GMAG 183 9757.56 87.18 119.39 31.37 4541. 94 3263.75 1096.45 5180.56 5295.32 78.05 0.43 MWD GMAG 184 9788.29 87.15 119.71 30.73 4543.46 3293.94 1081.31 5207.26 5318.34 78.27 1. 04 MWD GMAG 185 9819.56 87.94 120.06 31. 27 4544.80 3324.69 1065.75 5234.34 5341.74 78.49 2.76 MWD GMAG 186 9850.87 89.51 121. 40 31.31 4545.50 3355.58 1049.75 5261. 25 5364.95 78.72 6.59 MWD GMAG e 187 9881.79 90.27 120.86 30.92 4545.56 3386.13 1033.77 5287.72 5387.82 78.94 3.02 MWD GMAG 188 9912.65 89.21 120.25 30.86 4545.70 3416.57 1018.08 5314.29 5410.93 79.16 3.96 MWD GMAG 189 9943.81 88.72 120.59 31.16 4546.26 3447.29 1002.31 5341.16 5434.39 79.37 1.91 MWD GMAG 190 9974.53 88.52 120.96 30.72 4547.00 3477.61 986.59 5367.54 5457.46 79.58 1.37 MWD GMAG 191 10006.59 88.79 120.70 32.06 4547.75 3509.25 970.17 5395.07 5481.60 79.81 1.17 MWD GMAG 192 10037.57 88.55 121.61 30.98 4548.47 3539.85 954.14 5421.57 5504.89 80.02 3.04 MWD GMAG 193 10068.33 87.29 119.89 30.76 4549.59 3570.19 938.43 5447.99 5528.22 80.23 6.93 MWD GMAG 194 10099.46 86.46 119.55 31.13 4551. 28 3600.78 923.02 5474.98 5552.24 80.43 2.88 MWD GMAG 195 10130.47 87.87 121. 70 31.01 4552.82 3631.33 907.24 5501.63 5575.93 80.64 8.28 MWD GMAG 196 10161.25 88.69 121.12 30.78 4553.74 3661. 75 891.21 5527.89 5599.27 80.84 3.26 MWD GMAG 197 10192.30 89.68 119.99 31. 05 4554.18 3692.38 875.42 5554.62 5623.18 81.04 4.84 MWD GMAG 198 10223.23 89.58 119.92 30.93 4554.38 3722.83 859.98 5581. 42 5647.29 81. 24 0.39 MWD GMAG 199 10254.75 89.10 120.20 31.52 4554.75 3753.88 844.19 5608.70 5671.88 81. 44 1. 76 MWD GMAG 200 10285.04 90.30 121.54 30.29 4554.91 3783.78 828.65 5634.70 5695.30 81. 63 5.94 MWD GMAG 201 10316.50 91. 13 122.27 31. 46 4554.51 3814.93 812.03 5661.40 5719.34 81.84 3.51 MWD GMAG e 202 10346.85 91. 02 121.70 30.35 4553.94 3844.97 795.95 5687.14 5742.57 82.03 1. 91 MWD GMAG 203 10378.50 90.68 121.37 31. 65 4553.47 3876.28 779.40 5714.11 5767.02 82.23 1. 50 MWD GMAG 204 10409.36 90.75 122.62 30.86 4553.09 3906.83 763.05 5740.28 5790.78 82.43 4.06 MWD GMAG 205 10439.88 90.61 122.52 30.52 4552.73 3937.09 746.62 5766.00 5814.14 82.62 0.56 MWD GMAG 206 10470.89 90.16 121.85 31. 01 4552.52 3967.81 730.11 5792.24 5838.08 82.82 2.60 MWD GMAG 207 10502.40 89.69 122.16 31. 51 4552.56 3999.02 713.41 5818.96 5862.53 83.01 1. 79 MWD GMAG 208 10533.02 88.76 123.05 30.62 4552.97 4029.38 696.91 5844.76 5886.16 83.20 4.20 MWD GMAG 209 10564.03 89.14 127.49 31. 01 4553.54 4060.27 679.01 5870.06 5909.20 83.40 14.37 MWD GMAG 210 10595.33 89.68 127.73 31. 30 4553.86 4091.54 659.91 5894.86 5931.68 83.61 1. 89 MWD GMAG SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 9 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 211 10627.04 89.34 127.39 31.71 4554.13 4123.22 640.58 5919.99 5954.55 83.82 1.52 MWD GMAG 212 10658.20 88.90 128.03 31.16 4554.61 4154.35 621.52 5944.64 5977.04 84.03 2.49 MWD GMAG 213 10690.14 89.55 129.37 31.94 4555.05 4186.28 601. 56 5969.56 5999.80 84.25 4.66 MWD GMAG 214 10721. 53 90.27 131.51 31. 39 4555.09 4217.67 581. 20 5993.45 6021.57 84.46 7.19 MWD GMAG 215 10751.59 90.10 131. 53 30.06 4555.00 4247.72 561. 27 6015.96 6042.09 84.67 0.57 MWD GMAG 216 10782.38 88.45 131. 95 30.79 4555.39 4278.49 540.77 6038.93 6063.10 84.88 5.53 MWD GMAG e 217 10814.35 86.29 129.92 31. 97 4556.85 4310.42 519.85 6063.06 6085.30 85.10 9.27 MWD GMAG 218 10845.11 83.88 132.02 30.76 4559.49 4341.06 499.76 6086.19 6106.68 85.31 10.37 MWD GMAG 219 10876.17 83.54 131.13 31. 06 4562.89 4371.92 479.27 6109.29 6128.06 85.51 3.05 MWD GMAG 220 10907.24 83.74 131.16 31.07 4566.33 4402.79 458.96 6132.54 6149.69 85.72 0.65 MWD GMAG 221 10937.75 83.68 131. 58 30.51 4569.68 4433.11 438.91 6155.30 6170.93 85.92 1. 38 MWD GMAG 222 10968.51 83.60 130.74 30.76 4573.08 4463.67 418.79 6178.32 6192.49 86.12 2.73 MWD GMAG 223 11000.26 83.70 131.72 31.75 4576.60 4495.22 397.99 6202.05 6214.80 86.33 3.08 MWD GMAG 224 11030.10 82.88 132.52 29.84 4580.08 4524.83 378 .12 6224.03 6235.50 86.52 3.83 MWD GMAG 225 11060.81 82.81 133.25 30.71 4583.91 4555.27 357.38 6246.36 6256.57 86.73 2.37 MWD GMAG 226 11093.11 86.32 135.55 32.30 4586.97 4587.32 334.89 6269.32 6278.26 86.94 12.97 MWD GMAG 227 11123.24 87.59 136.36 30.13 4588.57 4617.24 313.26 6290.24 6298.04 87.15 5.00 MWD GMAG 228 11156.00 88.14 136.93 32.76 4589.79 4649.76 289.46 6312.71 6319.35 87.37 2.42 MWD GMAG 229 11186.56 91. 40 137.49 30.56 4589.91 4680.07 267.04 6333.47 6339.10 87.59 10.82 MWD GMAG 230 11216.83 92.67 134.73 30.27 4588.84 4710.15 245.24 6354.44 6359.17 87.79 10.03 MWD GMAG 231 11248.29 92.16 132.68 31. 46 4587.51 4741.51 223.52 6377.16 6381.08 87.99 6.71 MWD GMAG e 232 11280.02 92.94 128.57 31. 73 4586.10 4773.20 202.89 6401.21 6404.43 88.18 13.17 MWD GMAG 233 11310.85 91.54 127.38 30.83 4584.89 4803.99 183.93 6425.50 6428.13 88.36 5.96 MWD GMAG 234 11341. 87 91.06 128.37 31. 02 4584.19 4834.98 164.89 6449.98 6452.08 88.54 3.55 MWD GMAG 235 11372.69 91.19 128.88 30.82 4583.58 4865.79 145.66 6474.05 6475.69 88.71 1. 71 MWD GMAG 236 11404.34 90.34 128.04 31.65 4583.16 4897.42 125.97 6498.83 6500.05 88.89 3.78 MWD GMAG 237 11434.35 90.92 128.79 30.01 4582.83 4927.42 107.33 6522.34 6523.23 89.06 3.16 MWD GMAG 238 11465.92 92.43 131. 27 31.57 4581.91 4958.97 87.03 6546.50 6547.08 89.24 9.19 MWD GMAG 239 11497.03 91.98 133.43 31.11 4580.71 4990.03 66.09 6569.48 6569.81 89.42 7.09 MWD GMAG 240 11528.20 91.74 134.64 31.17 4579.70 5021.10 44.44 6591.87 6592.02 89.61 3.96 MWD GMAG · SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 10 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 241 11559.77 91.16 135.00 31. 57 4578.90 5052.55 22.19 6614.26 6614.30 89.81 2.16 MWD GMAG 242 11590.62 91.81 134.26 30.85 4578.10 5083.29 0.53 6636.21 6636.21 90.00 3.19 MWD GMAG 243 11622.01 92.43 134.45 31. 39 4576.94 5114.57 -21.40 6658.64 6658.67 90.18 2.07 MWD GMAG 244 11653.65 92.43 133.82 31.64 4575.60 5146.10 -43.41 6681.32 6681. 46 90.37 1. 99 MWD GMAG 245 11685.79 92.02 133.40 32.14 4574.35 5178.15 -65.57 6704.58 6704.90 90.56 1.83 MWD GMAG 246 11 714 . 92 90.78 132.17 29.13 4573.64 5207.23 -85.35 6725.95 6726.49 90.73 5.99 MWD GMAG e 247 11746.56 87.83 130.57 31. 64 4574.02 5238.86 -106.25 6749.69 6750.52 90.90 10.61 MWD GMAG 248 11778.71 85.08 131.92 32.15 4576.01 5270.94 -127.41 6773.81 6775.01 91. 08 9.52 MWD GMAG 249 11808.50 84.84 132.83 29.79 4578.63 5300.58 -147.41 6795.73 6797.33 91. 24 3.15 MWD GMAG 250 11839.67 85.22 132.16 31.17 4581.33 5331. 61 -168.38 6818.63 6820.71 91. 41 2.46 MWD GMAG 251 11870.35 84.64 131. 86 30.68 4584.04 5362.15 -188.83 6841.34 6843.94 91.58 2.13 MWD GMAG 252 11901.17 85.33 133.03 30.82 4586.74 5392.82 -209.55 6863.99 6867.19 91.75 4.39 MWD GMAG 253 11934.41 86.12 132.80 33.24 4589.21 5425.93 -232.12 6888.27 6892.18 91.93 2.47 MWD GMAG 254 11965.63 85.81 132.73 31.22 4591. 41 5457.03 -253.27 6911.13 6915.77 92.10 1. 02 MWD GMAG 255 11997.37 85.50 132.32 31.74 4593.81 5488.65 -274.66 6934.45 6939.89 92.27 1.62 MWD GMAG 256 12028.08 84.64 131.22 30.71 4596.45 5519.23 -295.04 6957.27 6963.53 92.43 4.54 MWD GMAG 257 12059.16 85.08 132.10 31.08 4599.24 5550.17 -315.62 6980.40 6987.53 92.59 3.16 MWD GMAG 258 12090.10 87.94 131.51 30.94 4601.12 5581. 04 -336.20 7003.42 7011.48 92.75 9.44 MWD GMAG 259 12121.02 89.96 128.34 30.92 4601.69 5611.95 -356.04 7027.12 7036.14 92.90 12.15 MWD GMAG 260 12152.42 89.82 127.16 31. 40 4601.75 5643.32 -375.26 7051.95 7061.93 93.05 3.78 MWD GMAG 261 12183.21 89.24 126.96 30.79 4602.00 5674.07 -393.82 7076.52 7087.47 93.19 1. 99 MWD GMAG e 262 12214.26 88.48 126.57 31.05 4602.62 5705.06 -412.40 7101.39 7113.35 93.32 2.75 MWD GMAG 263 12244.29 89.35 128.14 30.03 4603.19 5735.06 -430.62 7125.25 7138.25 93.46 5.98 MWD Incl. Only 264 12275.23 89.89 129.75 30.94 4603.39 5765.99 -450.06 7149.32 7163.47 93.60 5.49 MWD GMAG 265 12307.82 89.21 128.61 32.59 4603.65 5798.57 -470.65 7174.58 7190.00 93.75 4.07 MWD GMAG 266 12338.38 88.21 126.83 30.56 4604.34 5829.10 -489.34 7198.74 7215.35 93.89 6.68 MWD GMAG 267 12369.81 88.93 127.87 31.43 4605.12 5860.49 -508.40 7223.72 7241. 59 94.03 4.02 MWD GMAG 268 12401.41 90.10 129.25 31. 60 4605.39 5892.07 -528.10 7248.43 7267.64 94.17 5.73 MWD GMAG 269 12432.16 90.03 13 0.18 30.75 4605.35 5922.82 -547.75 7272.08 7292.68 94.31 3.03 MWD GMAG 270 12463.25 89.27 129.14 31.09 4605.54 5953.91 -567.59 7296.02 7318.06 94.45 4.14 MWD GMAG · SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 11 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 271 12494.97 89.79 129.01 31.72 4605.80 5985.63 -587.58 7320.64 7344.18 94.59 1. 69 MWD GMAG 272 12526.07 89.31 128.89 31.10 4606.05 6016.72 -607.13 7344.83 7369.88 94.73 1.59 MWD Incl. Only 273 12556.34 89.93 128.76 30.27 4606.25 6046.98 -626.11 7368.41 7394.96 94.86 2.09 MWD Incl. Only 274 12587.66 93.60 128.64 31.32 4605.28 6078.27 -645.68 7392.83 7420.98 94.99 11.72 MWD GMAG 275 12618.23 95.04 126.26 30.57 4602.98 6108.73 -664.21 7417.03 7446.71 95.12 9.08 MWD GMAG 276 12649.61 94.25 125.45 31. 38 4600.44 6139.92 -682.53 7442.38 7473.61 95.24 3.60 MWD GMAG e 277 12680.74 93.77 125.40 31.13 4598.26 6170.88 -700.53 7467.69 7500.47 95.36 1. 55 MWD GMAG 278 12711.97 93.19 123.58 31. 23 4596.37 6201.90 -718.18 7493.38 7527.71 95.47 6.11 MWD GMAG 279 12742.60 90.92 122.98 30.63 4595.27 6232.30 -734.98 7518.97 7554.80 95.58 7.67 MWD GMAG 280 12775.06 89.27 120.92 32.46 4595.22 6264.44 -752.16 7546.51 7583.90 95.69 8.13 MWD GMAG 281 12806.10 86.53 119.31 31. 04 4596.35 6294.99 -767.72 7573.33 7612.15 95.79 10.24 MWD GMAG 282 12837.10 87.32 121. 67 31.00 4598.02 6325.52 -783.42 7600.01 7640.28 95.89 8.02 MWD GMAG 283 12868.84 88.76 123.05 31.74 4599.10 6356.96 -800.40 7626.80 7668.69 95.99 6.28 MWD GMAG 284 12899.53 86.35 121. 25 30.69 4600.41 6387.33 -816.72 7652.76 7696.22 96.09 9.80 MWD GMAG 285 12930.78 85.98 120.92 31. 25 4602.50 6418.13 -832.81 7679.46 7724.49 96.19 1.58 MWD GMAG 286 12962.02 86.84 120.25 31.24 4604.46 6448.89 -848.68 7706.30 7752.89 96 .28 3.49 MWD GMAG 287 12991.90 86.63 120.86 29.88 4606.16 6478.32 -863.84 7731. 99 7780.10 96.37 2.16 MWD GMAG 288 13022.94 85.29 120.46 31. 04 4608.35 6508.87 -879.63 7758.62 7808.33 96 .47 4.50 MWD GMAG 289 13053.33 86.73 121.90 30.39 4610.46 6538.82 -895.33 7784.56 7835.88 96.56 6.69 MWD GMAG 290 13091. 95 88.83 120.89 38.62 4611.96 6576.98 -915.43 7817.50 7870.92 96.68 6.04 IMP None 291 13122.58 88.83 122.09 30.63 4612.58 6607.26 -931. 42 7843.62 7898.72 96.77 3.95 IMP None e 292 13154.46 89.31 122.19 31. 88 4613.10 6638.84 -948.38 7870.61 7927.54 96.87 1.54 IMP None 293 13186.07 89.07 121.34 31.61 4613.55 6670.12 -965.02 7897.48 7956.22 96.97 2.79 IMP None 294 13217.41 89.07 122.24 31.34 4614.06 6701.14 -981. 52 7924.11 7984.67 97.06 2.87 IMP None 295 13248.94 88.18 121. 43 31.53 4614.81 6732.34 -998.15 7950.89 8013.30 97 .16 3.82 IMP None 296 13278.92 88.32 121.12 29.98 4615.73 6761. 95 -1013.71 7976.50 8040.66 97.24 1.13 IMP None 297 13311.79 88.05 121.06 32.87 4616.77 6794.41 -1030.67 8004.64 8070.72 97.34 0.84 IMP None 298 13343.00 87.49 121. 65 31. 21 4617.98 6825.24 -1046.90 8031.27 8099.21 97.43 2.61 IMP None 299 13374.33 86.98 121.73 31. 33 4619.49 6856.21 -1063.34 8057.90 8127.75 97.52 1. 65 IMP None 300 13405.34 87.32 121.63 31.01 4621.04 6886.85 -1079.60 8084.25 8156.02 97.61 1.14 IMP None · SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 12 of 12 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 301 13440.36 88.76 121. 38 35.02 4622.23 6921.47 -1097.89 8114.09 8188.03 97.71 4.17 IMP None 302 13490.00 88.76 121. 38 49.64 4623.31 6970.54 -1123.73 8156.46 8233.51 97.84 0.00 Projected To TD [(c)2004 IDEAL ID8_1C_02J e e e e Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska! Inc. Dispatched To: Robin Deason Well No L-201 L2 Date Dispatched: 12-Apr-04 Installation/Rig 11.1.1..1 Dispatched By: N. Rose 11.1 No Of Prints No of Floppies Surveys 2 Received By: ILJ O/kJ '7 (VIo,> ~6-ð vi Please sign and return to: James H. Johnson BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) 900 E. Benson Blvd, Anchorage, Alaska 99508 Fax: 907-564-4005 e-mail address:johnsojh@bp.com LWD Log DeliveryV1.1, 10-02-03 ÀüU¡~GL1g Schlumberger Private . . FRANK H. MURKOWSKI, GOVERNOR AI,~SIiA ORAND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE,SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska)Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe L-201L2 BP Exploration (Alaska) Inc. Permit No: 204-048 Surface Location: 2598' NSL, 3588' WEL, SEC. 34, T12N, RIlE, UM Bottomhole Location: 1551' NSL, 4559' WEL, SEC. 35, T12N, RIlE. UM Dear Mr. Crane: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you ITom obtaining additional permits or approvals required by law ITom other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well PBU L-201, Permit Number, 204-046, API Number 50-029-23202. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission t witness any required test. Contact the Commission's North Slope petroleum field inspecto t -3607 (pager). ely, BY ORDER OF THE COMMISSION DATED this+- day of March, 2004 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 1a. Type of work 0 Drill ORe-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. location of Well (Governmental Section): Surface: 2598' NSl, 3588' WEl, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 4823' NSl, 544'WEl, SEC. 34, T12N, R11E, UM (OBa) Total Depth: 1551' NSl, 4559' EWl, SEC. 35, T12N, R11E, UM 4b. location of Well (State Base Plane Coordinates): Surface: x-583325 Y-5978321 Zone-ASP4 16. Deviated Wells: Kickoff Depth 6354 ft Maximum Hole Angle 930 18.~~'i;~'s' ;;!;isiz8~';+ .....:, ..;'> Hole Casing Weight 6-314" 4-1/2" 12.6# I STATE OF ALASKA . ALA í<A OIL AND GAS CONSERVATIO~OMMISSION PERMIT TO DRILL 20 MC 25.005 I'.. '.. .... .. 1b. Current Well claÖ Stratigraphic Test 8 ~c:tory ~ g:~::~~~:g~~;;(S;~~~:ðr;~;c~ 5. Bond: II Blanket 0 Single Well 11. Well Name and Number: Bond No. 2S1OO302630-277 PBU L-201L2 6. Proposed Depth: 12. Field / PooI(s): MD 13494 TVD 4636 Prudhoe Bay Field / Orion 7. Property Designation: ADl ADl 028238/.% 8".2.3 <f 8. land Use Permit: 13. Approximate Spud Date: March 13, 2004 14. Distance to Nearest Property: 5400' f:: MAR 0 4 200/ alRedrill 9. Acres in Property: 2560 10. KB Elevation Planned 15. Distance to Nearest Well Within Pool (Height above Gl): 78.7 feet l-119 is 350' away at top of OA 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2140 psig Surface: 1680 psig length 5668' MD 6341' TVD MD TVD (induding stage data) 4521' 13494' 4636' Uncemented Slotted liner ·..·.····.····~RçssN10W~CØNI)'T.QN§(Jt.1~Y.',ftô~ëPiñ~·fQ(·....~ :)'B~:~).,.;t'¡'. ····,;.',.,;:.':ffiii:¡:. ,;,"';' Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1 Junk (measured): 13632 4763 None 13632 4763 None Casing length Size C$rnentVoIUrl1é .' MD TVD Structural Conductor Surface Intermediate Production liner liner (OBb) 80' 3160' 7062 48" 10-3/4" 7-5/8" 260 sx Arctic Set (Approx.) 613 sx AS lite, 360 sx Class 'G' 578 sx Class 'G' 109' 3189' 7091' 109' 2639' 4686' 6541' 5668' 4-1/2" 4-1/2" Uncemented Slotted liner Uncemented Slotted liner 7091' - 13632' 6513' - 13536' 4686' - 4763' 4574' - 4657' Perforation Depth MD (ft): perforation Depth TVD (ft): II Drilling Program 0 Time vs Depth Plot o Seabed Report II Drilling Fluid Program o Shallow Hazard Analysis II 20 AAC 25.050 Requirements 20. Attachments 0 Filing Fee, $100 0 BOP Sketch II Property Plat 0 Diverter Sketch 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. printed~ame ell Crane Title Senior Drilling Engineer Prepared By NamelNumber: Signatur ~ ~ Phone 564-4089 Date "3 - " -cy Terrie Hubble, 564-4628 Commission Use Only Permit To Drill API Number: Permit Approval:? 0 ¡J See cover letter for Number: <0 '" - <::::) Ýs? 50- c:> 2.. <7 - Z ~ 2. Ö 2.. - b / Date: C) Ð V-I other requirements Conditions of Approval: Samples Required 0 Yes )rNo Mud log Required D Yes ~No Hydrogen Sulfide Measures 0 Yes ~ No Directional Survey Required ~Yes 0 No Other:·"\e.s t- p.> 0 f' E "3 S" 0 0 T' S ;' . Date: Contact Michael Triolo, 564-5774 DUPLICATE BY ORDER OF THE COMMISSION ~œ :ØL~ . Well Plan Summary Gwr Prudhoe Bay L-201 ML Permit 2,598' FSL, 3,588' FEL, Sec. 34, T12N, R11E X = 583,325.34 Y = 5,978,320.84 J-.r:~ _- -~ .~ ..............~w_ 4,813' FSL, 545' FEL, Sec. 34, T12N, R11E X = 586,340.00 Y = 5,980,570.00 Z = 4,625' TVDss 1,562' FSL, 736' FEL, Sec. 35, T12N, R11E X = 591,470.00 Y = 5,977,380.00 Z = 4,684' TVDss :iIIIIi!IIIBIII ----~ --- ---- -""" ,-- .------------ on ----"'--------------~y¡¡ - -- ----=~;'":_;_;___:_;x.-~"'_n;__" L-201 L 1 OBb Target Start: 5,067' FSL, 914' FEL, Sec. 34, T12N, R11 E X = 585,967.46 Y = 5,980,820.14 Z = 4,504' TVDss L-201 L 1 OBb Target End: 1,541' FSL, 696' FEL, Sec. 35, T12N, R11 E X = 591,510.00 Y = 5,977,360.00 Z = 4,578' TVDss ___ ' ~ .--"'--'- ._-~---- ··--------~"-----~ß:TJ.t~:.:..:..T~,:.L~:·IR!;br"'.."_m L-201 L2 OBa Target Start: 4,823' FSL, 544' FEL, Sec. 34, T12N, R11 E X = 586,340.00 Y = 5,980,580.00 Z = 4,465' TVDss L-201 L2 OBa Target End: 1,550' FSL, 720' FEL, Sec. 35, T12N, R11 E . '!l'L'_""~':,~~C~~:2.~""'!,:=~~~.~7.71~"c,~"'~;~~,?: :rvD~s LJ L-201 L3 OA Target Start: 5,222' FSL, 1,184' FEL, Sec. 34, T12N, R11E X = 585,695.78 Y = 5,980,972.12 Z = 4,415' TVDss 3,090' FSL, 4,782' FEL, Sec. 35, T12N, R11 E X = 587,405.00 Y = 5,978,860.00 Z = 4,150' TVDss I Type of Well (producer or injector): Surface Location: (As-~take~)____"'__ L-201 OBd Target Start: L-201 OBd Target End: L-201 L3 OA Target End: I AFE Number: I ORD5M3543 I Schrader OBd, OBb, OBa and OA Multilateral Producer I "n ~.Il!'Sw..wt,I:}i~_~ ~!.1IT:.:;~~:t':'}f,~ KBE = 78.70' I Rig: I Nabors 9ES I Estimated Start Date: I March 13m 2004 I I Operating days to complete: 146.86 OBd MD 13,632' Well TVDrkb: TD 4,763' Max Inc. 93° KOP 300' OBb MD 13,536' Well TVDrkb: TD 4,657' Max Inc. 92° KOP 6,526' OBa MD 13,494' Well TVDrkb: TD 4,636' Max Inc. 93° KOP 6,354' OAMD 9,668' Well TVDrkb: TD 4,444' Max Inc. 97° KOP 6,183' Target Estimates: Estimated Reserves OA I OBa I OBb I OBd: Expected Initial Rate OA I OBa I OBb I OBd: Expected 12 Month avg OA I OBa I OBb I OBd: Current Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Original Well API #: L-201 L1 API OBb #: L-201 L2 API OBa #: L-201 L3 API OA #. Well Type: Current Status: H2S: Expected reserves 6.90 mmbbl Production rate: 4,950 bId Production rate: 2,300 bId 5,400' MD from top OA to PBU boundary (this is the closest point in the producing well section to any unit boundary) Top OA: 350' away from L -119 top OA TD: 2,270' away from L-210 50-029-XXXXX-00 50-029-XXXXX-60 50-029-XXXXX-61 50-029-XXXXX-62 Schrader O-sand Quadlateral Producer New well, 20" X 34" insulated conductor to be set o ppm from produced fluids (approximated to be around 10 ppm due to contaminated gas lift gas) Final Permit 3/4/04 · G.er Prudhoe Bay L-201 ML Permit OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's 84 of @ 4,400' TVDss (Estimated) BHP: BHT: Mechanical Condition Conductor: Cellar Box Height: Nabor 9ES: 20" X 34", 215.5Iblft, A53 ERW set at 109' RKB Above MSL = 50.20' KB I MSL = 78.70' Materials Needed ¡1B.···.····.·······~I'~f..i·······lI_~t_'··· ····#'1·· ... 1~·I·I'^'···'þ"'i!iIIí¡W¡¡¡V··.F "1 .·!.~-"¡;'~Lr.íl ·II·I"illi'II-"-".·· ". ·II·!··III··· ¡ =3" g~~,JUY. ,.,.... 'Þ'% JW,I:. ..[, ..¡g!IUlILl'J.,,,,,,,;JL. II ~m Jllllllm-.æ. 11m. I 3,190' 10-%",45.5#, L-80 BTC Casing (Burst: 5,210; Collapse: 2,470) 1 each 10-%", BTC Float Shoe and Float Collar 25 each 10-%" x 13-'W Bow Spring Centralizers 1 assembly FMC 11" 5m Gen 5 Wellhead System 1 lot 10-%" casing pups 5', 10', 20'. 1 each 1 0-%" TAM Port Collar .......I1IIiII..llllBi:_:lf ·~'n..rr~TI '1~I_ 1[II.l]œm'~ w1fmm mnlf, 7,091' 7-%" 29.7# L-80 BTC-M Casing (Burst: 6,890; Collapse: 4,790) 1 each 7-%" BTC-M Float Shoe and Float Collar 75 each 7-%" x 9-%" Rigid Straight Blade Centralizers 20 each 7-%" Stop Rings 2 lots 7-%" casing pups 5', 10',20' 3 each 7-%" RA Tag 2 each 7-%" 29.7# L-80 BTC-M Casing Short Joint ;;;¡;ml~~' 4 x Production Liners: 1 .IfJlu.:;~,=i~~:,:D~' It~æ.1 24,300 4 *",12.6#, L-80, IBT-Mod Slotted Liner 607 each 4 *" x 5 %" x 8" Straight Blade Centralizers 4 each 7-%" x 4-*" Baker ZXP Liner Top Packer 4 each 4-*" Halliburton Float Shoes 3 assemblies Baker Level 3 Hookwall Hangers with LEM lillli'¡¡:- 6,150' 1 each 1 each 1 each 1 each 2 each 1 each 4 each 1 each 6,150' 3 each 1 each 4-*", 12.6Ib/ft, L-80, BTC-M tubing Baker PRM Production Packer 7-%" X 4-*" 11" X 4-*" FMC tubing hanger 4-1116", 5m Cameron Tree Halliburton XN-Nipple (3.725" 10) Halliburton X-Nipple (3.813" 10) 4-*" Baker CMD Sliding Sleeve Cameo 4-*" X 1" KBG-2 Gas Lift Mandrels Phoenix pressure gauge I-wire for the Phoenix gauge Half-muleshoed joint of 4-*" IBT-M tubing 4-*" WLEG Surface and Anti-Collision Issues ~urface Shut-in Wells: L-119 will need to be shut-in for the rig move on and off L-201. '::Iose Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile. 2 Final Permit 3/4/04 . G.er Prudhoe Bay L-201 ML Permit ~;=~Wiilii"~~ II~~~'_"~I~ L-21 0 30.13-ft 249.39-ft 26.01-ft Use Traveling Cylinder (Gyro) L-120 47.06-ft 299.58-ft 42.05-ft Use Traveling Cylinder (Gyro) L-103 30.23-ft 449.73-ft 23.14-ft Use Traveling Cylinder (Gyro) L-119 17.33-ft 549.94-ft 8.43-ft Use Traveling Cylinder (Gyro) Mud Program 13-~" Suñace Hole Mud Properties: I Spud - Freshwater Mud Interval I Density (ppg) Funnel vis YP Tauo PH Plastic Vis 0-1,700 8.6-9.2 250-300 50-70 10-18 8.5-9.0 20-45 1,700-2,500 9.0-9.5 200-250 30-45 8-16 8.5-9.0 20-40 2,500-3,190 9.3-9.5 200 30-40 9-14 8.5-9.0 14-20 Interval Specific Maintain Viscosity greater then 250 Objectives: Ensure fluid loss below permafrost is below 6 WIn 0 " , ' " _w~_,.." ¡ ¡ . ,,,,,*,,,,,,~!int~i~ ~,u¡~,!:mfer~ture b:,lo~ 50° F ¡ '''La" "" .., '" 9-~." Intermediate Hole Mud Properties: I Freshwater Mud (LSNO) PH: 9.0 - 9.5 Interval I Density (ppg) Funnel vis I YP I Tauo I PV I API Filtrate I MBT 9.0-9.3 45-55 26-30 3-6 12-18 4-6 <20 Maintain proper fluid rheology & lubricant concentration to achieve the directional requirements Optimize mud rheology to maximize ROP while maintaining an ECO <0.7 ppg over calculated clean hole. Reduce shaker blinding while drilling the UGNU. 6-*" Production Hole Mud Properties: I LVT-2oo MOBM (Versa-Pro) Interval I Density (ppg) Stability I YP I Oil: H20 Ratio I PV I API Filtrate I MBT 9.2 650 - 900 18 - 25 80 : 20 15 - 20 4 - 5_5 < 6 Minimize solids/liquid invasion by maintaining optimum P50 of bridging agents. Maintain minimal ECO's by reducing drill solids accumulation through utilization of the rigs solids control system and effective dilution. FL NC-8 8 5.5-8 Interval Specific Objectives: Interval Specific Objectives: Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Oiverter, BOPE and drilling fluid system schematics are on file with the AOGCC. Production Section- · Maximum anticipated BHP: 2,140 psi @ 4,600' TVOss (8.90 ppg EMW). Actual from L-120 MDT's · Maximum suñace pressure: 1,680 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: · Planned completion fluid: 3,500 psi (7-%" casing will be tested to 3,500 psi) Estimated 9.2 ppg Brine /6.8 ppg Diesel ¡ ~. ~,:::l.3iMI~.'fS~~~~ r 5,000 psi Working Pressure 3,500/250 psi Rams & Valves (entire stack and valves 3,500/250 psi Annular Disposal · NO ANNULAR INJECTION ON THIS WELL. · No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at 05-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to 05-04 for injection. Haul all Class I waste to Pad 3 for disposal. 3 Final Permit 3/4/04 · ~er Prudhoe Bay L-201 ML Permit Formation Markers 1111I'11»".»1:' ~ !1"_,L1*~ SV5 1,475 1617 675 8.8 No SV4 1,600 1766 730 8.8 No Base Permafrost 1,680 1866 770 8.8 No SV3 1,960 2245 890 8.7 Poss. Gas Hydr. SV2 2,130 2509 960 8.7 Poss. Gas Hydr. SV1 2,460 3031 1,120 8.8 Poss. Gas Hydr. UG4 2,750 3490 1,255 8.8 Yes - Heavy Oil UG4A 2,785 3546 1,270 8.8 Yes - Heavy Oil UG3 3,150 4123 1,420 8.7 Yes - Heavy Oil UG1 3,500 4672 1,600 8.8 Yes - Heavy Oil Ma 3,960 5379 1,820 8.8 Yes - Heavy Oil Mb1 4,000 5444 1,825 8.8 No - Wtr Mb2 4,080 5578 1,830 8.6 No - Wtr Mc 4,155 5710 1,845 8.5 No - Wtr Na 4,200 5793 Nb 4,230 5850 1,890 8.6 No - Wtr Nc 4,275 5940 OA 4,370 6151 1,970 8.7 Yes OBa 4,440 6226 2,000 8.7 Yes OBb 4,490 6494 2,060 8.8 Yes OBc 4,545 6734 2,110 8.9 Yes OBd 4,600 7051 2,140 8.9 Yes TO (OBd) 4,684 13,632 2,168 8.9 Yes Casing/Tubing Program 48" 20" X 34" 215.5# A53 Welded 80' 29' /29' 109' /109' 13-%" 10-%" 45.5# L-80 BTC 3,160' 29' /29' 3,189' /2,639' 9-%" 7-%" 29.7# L-80 BTC-M 7,062' 29' /29' 7,091' /4,686' 6-3,4" OBd 4-%" slotted 12.6# L-80 IBT 6,541' 7,091' /4,686' 13,632' /4,763' 6-3,4" OBb 4-%" slotted 12.6# L-80 IBT 5,668' 6,513' /4,574' 13,536' / 4,657' 6-3,4" OBa 4-%" slotted 12.6# L-80 IBT 5,668' 6,341' / 4,521' 13,494' / 4,636' 6-3,4" OA 4-%" slotted 12.6# L-80 IBT 3,729' 6,170' / 4,456' 9,668' /4,444' Tubing 4-%" 12.6# L-80 IBT-M 6,121' 29' /29' 6,150' / 4,454' Cement Calculations Casing Size 110-% -in 45.5-lblft L-80 BTC surface casing Basis 250% excess in permafrost. 30% excess below permafrost. Top of tail cement 800' MD above shoe Total Cement Vol: Wash 2Q-bbl CW Spacer Spacer 70-bb11 0.1-lb/gal MudPush spacer Lead 468-bbl, 613-sx 10.7-lb/gal ASL - 4.28 felsx (cement to surface) Tail 75-bbl, 360-sx 15.8-lb/gal Premium G - 1.17 fta Isx ,_"_,"w.""~~~e"2!"!!~:!=~~_~~w_",.,~",*"""",,,,,,-,,,__"'''''<'''''=''''''h='_'_'*'''__' ~- Temp I BHST == 55°F from SOR, BHCT 60°F estimated by Dowell In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. 4 Final Permit 3/4/04 · Ger Prudhoe Bay L-201 ML Permit Casing Size 17-% -in 29.7-Iblft L-80 BTC-M intermediate casing Basis Top of tail cement 700-ft MD above top of Schrader Ma-sand. 30% excess over gauge. Total Cement Vol: Wash 25-bbl Water Spacer 45-bbI10.3-lb/gal MudPush Spacer Tail 124 bbl, 578-sx 15.8-lb/gal Premium - 1.20 ft;'/sx to of tail at 4,679-ft MD To Ma: 51379' MD ^_______~#~7/d::;:;;w;,';;;,,:"";,,::~w_"':>m:;z""'..;..:<_~=;,,:"';;_;v Temp BHST == 120°F from SOR, BHCT 90°F estimated by Halliburton 1~" Casing Centralizer Placement a) Run (25) 9-%" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 2,189' MD (1,00' MD above the shoe). b) This centralizer program is subject to change pending actual hole conditions. 7-%" Casing Space Out a) Space 7-%" casing out with pups and long/short joints as required to place the top of a long full joint - 5- 15' above the top of the OBb, OBa and OA sands to allow for the window to be milled just below the top of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance reservoir contact depending on the angle of intersection of each zone. b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth except on the OBd lateral. It will need to be placed 120' above the casing shoe. c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out. 7-%" String Centralizer Placement a) Centralizer size: 7-%" X 9-Yá" (this is different then the norm of W under gauge hole) b) Do not run centralizers on the window joints spaced at the top of each sand. c) Place 2 rigid straight blade centralizers back to back at the very bottom of the shoe joint. Do not run any centralizers on the next two full joints. d) With the exception stated above, alternate 1 rigid straight vane cenralizer floating across a full joint and 2 rigid straight vane centralizers, one floating on the upper half of the joint and one floating on the lower half of the joint separated by a stop collar up to ±5,830' MD (320' MD above the top OA sand). Then continue with 1 rigid straight vane centralizer per joint floating to 4,600' MD (780' MD above Ma sand). Zonal isolation with cement is required between the OA and the Nb sands due to the presence of water in the Nb sand. The centralizer program is subject to change pending modeling and hole conditions. 4 W' Solid Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop collar. Do not put any centralization on the first two joints above the bent joint. Survey and Logging Program 13-1h" Hole Section: Surface Gyro if needed (have discussion with ODE on photo or E-line Gyro) Open Hole Drilling: MWD I GR Cased hole: None 9-%" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only) Open Hole: None __-2s,:~, Ho~~,;,. "~~!!'M~~?~'~?~ {~~I!¡~~"c.?n~~~¡;~~~,,!~~;,~~~",!,j.?b)m¡,,_,____~_.,",..,~.'>_ ~" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (DenlNeu recorded only) I AIM I PWD Cased Hole: None 5 Final Permit 3/4/04 · Wer Prudhoe Bay L-201 ML Permit DrillinQ Hazards and ContinQencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Schrader in this fault block is expected to be underpressured based on the MDT samples. a. OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's b. OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's c. OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's d. OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's II. Hydrates and Shallow gas A. Gas hydrates are present below L-pad, but have not been a significant issue thus far during L-Pad drilling. If hydrates are encountered follow the recommended practice and apply good drilling operational practices. III. Lost Circulation/Breathing A. Lost circulation is unlikely within the Schrader interval. B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee. IV. Kick Tolerancenntegrity Testing A. The 10-%" casing will be cemented to surface. B. The 7-%" casing will be cemented with 15.8 Ib/gal tail cement to 700' MD above the Ma sand -4,680' MD. C. The Kick Tolerance for the surface casing is 52.7 bbls with 9.2 ppg mud, 11.4 ppg LOT, and an 8.9 ppg pore pressure (most likely 8.9 ppg based on recent MDT's within the block). If the LOT is less then 11.4 ppg EMW, then the kick tolerance will be < 50 bbls. D. The Kick Tolerance for the production hole laterals is infinite with 9.2 ppg mud, 12.0 ppg FIT, and an 8.9 ppg pore pressure. If the FIT is less then 12.0 ppg EMW notify the ODE to have conversation on how to deal with potential ECD concerns around the casing exit points. E. Integrity Testing V. ···"~lrlJø. 1 O-%-in Window 7 -%-in Shoe 7-% -in Window 7-% -in Window 7-% -in Window 1_,U¡~î~~;:tÁ¡íÌ;..""M.~"'}. 20-ft min new formation below shoe LOT 11.4 minimum 20-ft min new formation below shoe FIT 12.0 minimum 20-ft minimum from top window FIT 12.0 minimum 20-ft minimum from top window FIT 12.0 minimum 20-ft minimum from top window FIT 12.0 minimum Stuck Pipe A. We do not expect stuck pipe. B. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners moving as much as possible and run one centralizer per joint to help with standoff. VI. Hydrogen Sulfide A. L-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. Recently 10 ppm of H2S has been measured at L-Pad from all wells tested as recently as January 2003 with hand held H2S meters. This is as a result of H2S being transmitted by shared gas lift gas and not produced from L-Pad. There has been no seawater injection at L-Pad to date. VII. Faults There are four visible faults to cross while drilling the well. It is possible to encounter sub-seismic faults along the proposed well path. In the production hole sections, if a fault throws us out of section steer up as fast as possible to determine where we are within the section. This will make it easy to lows ide OH sidetrack to get back on course. Fault #1 : Fault #2 SV6 UG1 1,090' MD 5,190' MD 1,000' TVDss 3,840' TVDss 80' West throw 40' Southwest throw CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 Final Permit 3/4/04 · G.er Prudhoe Bay L-201 ML Permit Drill and Complete Procedure Summary Pre-Ri2 Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. Drillinq Riq Operations: 1. MIRU Nabors 9ES Nipple up diverter spool and riser. Function test diverter. PU 4,200' of 5" DP as required and stand back in derrick (this will enable both holes to be drilled without changing the DP handling equipment in open hole). 2. MU 13-*" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,189' MD 12,639' TVD. The actual surface hole TO will be +1-100' TVD below the top of the SV1 sand. 3. Run and cement the 10-3,4",45.5# L-80 surface casing back to surface. Will use TAM collar as contingency only. NO drilling spool and riser and NU casing 1 tubing head. NU BOPE and test to 3,500 psi. 4. MU 9-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at ±800' from the bit in the HWDP section and RIH PU 4" DP to float collar. Test the 10-3,4" casing to 3,500 psi for 30 minutes. 5. Drill out shoe track. Circulate and condition mud. Displace well to new LSND drilling fluid. Drill 20' of new formation below rathole and perform a LOT. Directionally drill ahead to TD (Topset the OBd) as per directional profile to 7,091' MD 14,686' TVD. 6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TO. Make sure hole is clean prior to POOH. POOH laying down the 5" DP and standing back the 4" DP, LD drilling BHA. Retrieve bowl protector. 7. MU and run 7-%" 29.7# L-80 BTC-M long string casing to TO. Cement in one stage to 700' MD above the Schrader Ma sand. Bump plug with seawater. Land casing on mandrel hanger. 8. Clean pits for displacement. Freeze protect 7-%" x 10-3,4" annulus with dead crude to 2,200' TVD. 9. PU 6-%" Powerdrive RSS or conventional assembly with MW DIG R/Resl Azimuthal Den /Neu/PWD and RIH to the float collar picking up 4" DP on the way. Test the 7-%" casing to 3,500 psi for 30 minutes. 10. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation below rathole and perform an FIT to 12.0 ppg EMW. Directionally drill ahead to TO geosteering through the OBd to TO at 13,632' MD 1 4,763' TVD (prognosed). Perform wiper trip, circulate and condition mud. 11. POOH to near OBb window depth, log into top OBb and OBb RA marker with GR, log across the OBa and OA windows as well. POH LD drilling assembly. 12. MU and run 4-*" 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TO. Position liner top packer 100' below OBb window. 13. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is near the top of the OBb sand (planned window exit: 6,501' MD). Orient whipstock to highside. Shear off Whipstock & mill window. Perform FIT to 12 ppg EMW. POOH 14. RIH with 6-3,4" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock. Directionally drill to 6-%" TO. Planned TO is 13,536' MD. Circulate and condition mud and perform wiper trip. POOH. 15. Pull whipstock #1. Run and set 4-*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, circulate and condition mud, POOH 16. PU the 7-%" whipstock assembly. Set the whipsock on the OBb liner top packer such that the top of the window is near the top of the OBa sand (planned window exit: 6,329' MD). Orient whipstock to highside. Shear off of Whipstock and mill window. Perform FIT to 12 ppg EMW. POOH 17. RIH with 6-%" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock. Directionally drill to 6-3,4" TD. Planned TD is 13,494' MD. Circulate and condition mud and perform wiper trip. POOH. 18. Pull whipstock #2. Run 4-*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 19. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is near the top of the OA sand (planned window exit: 6,158' MD). Orient whipstock to highside. Shear off of Whipstock and mill window. Perform FIT to 12 ppg EMW. POOH 20. RIH with 6-3,4" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock. Directionally drill t9 6,:~ATD. Planned TD is 9,668' MD. Circulate and condition mud and perform wiper trip. POOH. .1. Pull whipstock ttz.~Ifùn"4-*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL brine. POOH. 7 Final Permit 3/4/04 · eer Prudhoe Bay L-201 ML Permit 22. MU 4-%" 12.6# BTM-M, L-80 completion assembly and RIH. See completion schematic for details. land tubing hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus. 23. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK-1 valve. 24. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 25. Pull two-way check. Freeze protect the well to 2,200' TVD. Install VR plug in 7_%" casing annulus valves. 26. Install BPV. Secure the well and rig down I move off Nabors-9ES. 8 Final Permit 3/4/04 POST RIG - COMPLEIN TREE: FMC 4-1/16" 5M L-201, L 1, L2, & L3 WELLHEAD: FMC Gen 5 System 11", 5M csg.head wI?" mandrel hanger & packoff 111:( ~~: ~ 1~;ii-~~~~~g s:~~:: with control line ports it'(' 11" X 4-1/16" Adaptor Flange ,!~ 20" X 34" 215.5 tblll, A53 ERW I"mlated I 109' ~::;:: ~:~:::~:,:D) 2,200'1VD . I Orig KB elev (N-9ES) = 28.5' I AI .- Junction Specifications: Junction JO through LEM Module without diverter: 3.65" ~ 1 0w3/4", 45.5# L-80 BTC Csg @ 3,197' MD Phoenix Pressure Gauge with control lines to surface -5/8" X 5-1/2" Baker PRM Packer 4-1/2", 12.6 Iblft, L-80, BTC-M Coupling 00: 5.2" OriftllD: 3.833"/3.958" 4.5" Baker sliding sleeve with 3.813" ID 4.5" WlEG I 6,128' MD I 9.2 PPG Versapro MOBM below Completion 6-3/4" OA Lateral 16,158'-9,668' I 7-5/8",29.7#, L-80, BTC-M Casing Drift: 6.75" Casing 10: 6.875" 6-3/4" OBa Lateral 16,329'-13,494'1 ........::~-:::,~:.:::....-_....._-~>:.::~::::::....- --...-....:,:.:,~-- ---fi,-- ....:_....-::..~':':....-:::....:_:-:._.:',.tI!IIII:::- ::-.- - __:::_ ...:::.....', ,Li;:,-è*:~ .__ ... ._._..._~. _. .. . __: _ m__. ...,___ ___ .... _~... :';." Baker Hughes HookwaU Hanger @ 6,148' MD Window in 7-5/8" casing@ 6,158' MD Well Inclination @ Window = 66° Baker Hughes Hookwall Hanger@ 6,319' MD Window in 7-5/8" casing@ 6,329' MD Well Inclination @ Window = 70° Baker Hughes Hookwall Hanger@ 6,491' MD Window in 7-5/8" casing@ 6,501' MD WeUlnclination @ Window = 74° 6-3/4" OBb Lateral 6,501 '-13,536'1 7-5/8" Casing Shoe @ 7,091' MD \I 6-3/4"OBd Lateral 17,091'-13,6321 DATE REV. BY COMMENTS G~~1v API NO: 50-029-xxxxx-OO 50-029-xxxxx-60 SO-029-xxxxx-61 SO-029-xxxxx-62 ORION WELL: L-201 ML 31412004 MIK TRIOLO Level 3 Multi-lateral, 4-112" GL Completion I -~-- I . PLANT ) 15'00'00· GRID L-111i. L-114. L-SD · L-121 · L-110. L-SI · L-116 . L-109 . ¡ L-SL · I L-OI · L-107 . L-108i. L-105i. L-106 . L-104 . S-W · L-102 . /1) ç ~ ~I ~>M~ . 33 ' ~34 -,¡§. , I L-PAD ,'Co '/, PROJECT ' " ':~' T12N AREA T11N w L-PAD " . N-L (NWE-1) 2 ¡¡;: 4 .~ " , ~. "', --r... ; ." , - V-'-... · N-A (NWE-2) · L-113 · L-112i · L-02 · L-122 VICINITY MAP N.T.S. LEGEND -+ AS-BUILT CONDUCTOR . EXISTING CONDUCTOR · L-115i · L-117 · L-118 · L-103i I~ L- 201 t L-119i L-21Oi L-120 ~~\!«X:I SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF DECEMBER 18, 2003, ~ NOTES 1. DATE OF SURVEY: DECEMBER 18, 2003. 2. REFERENCE FIELD BOOK: WOO3-14 PAGES 37-38. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. BASIS OF HORIZONTAL LOCATION IS L-PAD OPERATOR MONUMENTATlON. 5. BASIS OF ELEVATION IS L-PAD OPERATOR MONUMENTS. ELEVATIONS ARE BP MSL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N.. R. 11 E., UMIAT MERIDIAN. ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS L-201 y= 5.978.320.84 N= 10,000.09 70'21'02.654" 70.3507372' 502' 2.598' FSL x= 583,325.34 E= 5,340.15 -149'19'24.511" -149.3234753' . 3,588' FEL y= 5,978,328.65 N= 10,000.14 70'21'02.727" 70.3507575' 50.8' 2.605' FSL L-21Oi x= 583,354.28 E= 5,370.13 -149'19'23.663" -149.3232397' 3,559' FEL o 12/111/03 ISSUEO FQR lNf'ORN"lION NO. DAlE RE\1SIOH 1ffi~' DRA~: ObP JACOBS CHECKED: O'HANLEY DATE; 12/19/03 DRA'MNG: GPB WOA l-P AD SHEET: FRB03 WOI. 02-00 ~ ff]~~[JJ(~O JOB NO: SCALE: AS-BUILT CONDUCTORS OIOIIoIŒItSAfIOlAIIO~ 1 OF 1 JJ LOH 10'1 CST rw.au I..-t I". 130' WELLS L-201 &: L-210i BY Q ( ............. ..-. ...., Ò L-201 L2 (P3) Proposal Schlumberger Report D..: January 9. 2004 Survey I DLS Computation Method: Minimum Curvature 1 Lubinski Client: BP exploration Alaska Vtrtlc.1 SaotIon Azimuth: 130,000' Flald: Prudhoe Bay Unit - WOA ~04 Vtrtlcal SteIIon Drlgln: N 0,000 It. E 0,000 II Structural Slot: L-PAD / Plan L-201 (N-U) d 03/0^ TVO Rtftronca Datum: Rotary Table wtß: Plan L-201 (N-U) TVO Rtftl'tnCl EIeVlllon: 78,70 II relatiVe to MSL BorthoI.: Plan L-201L2 OBa APprove Sa. Bod I Ground Lovot Eltvatlon: 50.20 II relatiVe to MSL UWIIAPW: 50029 Magnatie DecHnatIon: 25,027' Survey Nam.' Do.: L-201L2 (P3) OBa / January 9. 2004 Total Field Strtngth: 57559,384 nT . Tort I AHD DDtI ERD 11IIo: 248.153' 16759,3111/7,083/3,615 Magnttlc Dip: 80,822' Grid Coordlnata Syttam: NAD27 Alaska State Planas, Zone 04. US Feet Declination Data: 2(»Aar-04 location LlllLono: N 70,35073717. W 149,32347531 Magnatlc Decnnatlon Modot: BOOM 2003 Location Grid HIE YfX: N 5978320,840 flUS, E 583325,340 flUS North Rtftrtnca: True North Grid Convargonca Anglo: +0,63713312" Total Corr Mag North.. TM North: +25.027' Grid Scalo Factor. 0,99990789 Local Coordln"" Rtftl'tncod To: Wen Head I Commtntl I~I Inclination I Azimuth I TVO I sU~TVOI VtrtlClI I Along Holt I NS EW I DLS I Bulld~. I W.Uata I Tool F.et I Northing Eating Latltudt Longltud. SteIIon Dtpartul't (dog) (dog) (It) (It) (It) (It) (It) (It) (dag/I00It) (dogl100lt) (dog/loolt) (dog ) (ItUS) (flUS) Top Whipstock 6329,00 69.65 109.43 4516,68 4437,98 -105,39 3966.73 2731.77 2154,66 4.00 2.39 3.43 30.00G 5981076.15 585449.29 N 70,35819927 W 149,30597722 Base Whipstock 6341,00 71.31 110,44 4520,69 4441,99 -94,77 3978.04 2727.92 2165,29 16,00 13,88 8,44 O.ooG 5981072,41 585459.96 N 70,35818873 W 149,30589088 KOP Crv 10/100 6354.00 71.31 110.44 4524,86 4446,16 -83,16 3990.36 2723,62 2176.83 0.00 0.00 0,00 29.10G 5981068.24 585471.54 N 70.35817697 W 149,30579718 6400,00 75.35 112.75 4538.06 4459,36 41,36 4034.42 2707.40 2217.79 10.00 8,77 5.02 28.43G 5981052.47 585512.68 N 70.35813262 W 149,30546460 6500,00 84.18 117,52 4555,82 4477,12 53,65 4132,72 2665.60 2306,74 10.00 8.83 4,77 27.58G 5981011,67 585602.08 N 70.35801837 W 149,30474233 90'PI 6565.60 90,00 120.55 4559. 15 4480.45 117,93 4198.21 2633.82 2363,99 10,00 8,87 4.62 27.43G 5980980,53 585659.67 N 70,35793149 W 149,30427749 End Cry 6578.25 91.12 121.13 4559.03 4480,33 130.42 4210.86 2627.34 2374.84 10,00 8.88 4.61 O.OOG 5980974,17 585670.60 N 70.35791378 W 149,30418934 Cry 6/100 7339,46 91.12 121.13 4544,13 4465.43 882,39 4971,93 2233,85 3026.30 0,00 0.00 0,00 -22.39G 5980587,99 586326.33 N 70,35683817 W 149,29890017 L-201L2 Tgt 2 OBa 7355,30 92.00 120.77 4543,70 4465,00 898.02 4987,76 2225,71 3039.88 6,00 5.55 -2.29 -22.72G 5980580.00 586340,00 N 70,35681591 W 149.29878994 End Cry 7376.85 93.19 120.27 4542.72 4464,02 919.26 5009,29 2214.78 3058.43 6.00 5.53 -2,32 O.ooG 5980569.28 586358,67 N 70,35678602 W 149,29863935 Cry 6/100 7591.97 93.19 120.27 4530,74 4452,04 1130.96 5224,08 2106.51 3243.93 0,00 0,00 0,00 116.11G 5980463.09 586545.34 N 70,35649003 W 149,29713337 7600.00 92,98 120.70 4530.31 4451.61 1138.86 5232,09 2102.44 3250.84 6,00 -2.64 5,40 116,13G 5980459.10 586552.29 N 70,35647891 W 149,29707730 . L-201L2 Tgt 3 OBa 7637.05 92,00 122.70 4528,70 4450,00 1175,49 5269.11 2082.99 3282.33 6,00 -2.65 5,39 115,79G 5980440,00 586584.00 N 70,35642574 W 149,29682163 End Cry 7677.80 90.94 124,90 4527,66 4448,96 1215,98 5309,84 2060.33 3316,17 6,00 -2.61 5.40 O,ooG 5980417.72 586618.09 N 70,35636380 W 149,29654690 Cry 6/100 8001.25 90,94 124.90 4522.38 4443.68 1538.10 5633,24 1875.29 3581.41 0,00 0.00 0.00 -90,01G 5980235,66 586885.34 N 70,35585795 W 149,29439379 8100,00 90.93 118,98 4520.77 4442.07 1635,83 5731.99 1823.08 3665,17 6.00 -0,01 -6.00 -90,10G 5980184.39 586969.67 N 70,35571521 W 149,29371389 L-201L2 Tgt 4 OBa 8166.24 90.92 115,00 4519,70 4441.00 1700.35 5798.22 1793,03 3724,18 6.00 -0,01 -6.00 -90,05G 5980155,00 587029,00 N 70.35563303 W 149,29323485 8200.00 90.92 112,97 4519.16 4440,46 1732,79 5831.97 1779,31 3755.01 6.00 -0.01 -6.00 -90.08G 5980141,62 587059.98 N 70.35559550 W 149,29298451 8300.00 90,90 106,97 4517,57 4438,87 1826,69 5931,96 1745.17 3848.94 6.00 -0.01 -6,00 -90.18G 5980108,53 587154.28 N 70,35550211 W 149,29222194 End Cry 8326,76 90,90 105,37 4517,15 4438.45 1851.16 5958.72 1737.72 3874.64 6.00 -0.02 -6.00 O.OOG 5980101,37 587180.05 N 70.35548172 W 149,29201331 Cry 6/100 9031,73 90.90 105.37 4506.09 4427.39 2491.90 6663,60 1550.91 4554.32 0.00 0.00 0,00 94,82G 5979922,15 587861.71 N 70.35497034 W 149,28649523 9100,00 90.55 109,45 4505.22 4426,52 2554.92 6731.86 1530.50 4619.44 8.00 -0,51 5.98 94,88G 5979902.46 587927.05 N 70,35491445 W 149,28596656 9200.00 90.04 115.43 4504,70 4426.00 2650,21 6831.86 1492.34 4711.83 6,00 -0,51 5.98 94,91G 5979865.34 588019.84 N 70,35481006 W 149,28521661 L-201 L2 Tgt 5 OBa 9207.90 90,00 115.90 4504.70 4426.00 2657.86 6839.76 1488,92 4718,95 6,00 -0.51 5,98 96,83G 5979862,00 588027.00 N 70,35480070 W 149.28515880 9300.00 89,34 121.39 4505.23 4426,53 2748.12 6931.86 1444.79 4799.75 6,00 -0.71 5.98 96,80G 5979818,77 588108,27 N 70,35468000 W 149.28450300 9400.00 88.84 127,35 4506.99 4428,29 2847.58 7031.84 1388.38 4882.24 6,00 -0.71 5.96 96,69G 5979763.29 588191,38 N 70.35452574 W 149,28383347 9500.00 87.95 133,31 4509.97 4431.27 2947.49 7131.80 1323.72 4958.41 6,00 -0.69 5.96 96,52G 5979699,49 588268,26 N 70.35434897 W 149,28321537 End Cry 9527.80 87.76 134,97 4511,01 4432,31 2975.20 7159,58 1304.38 4978,34 6.00 -0,66 5.97 O.OOG 5979680.37 588268,40 N 70,35429608 W 149,28305360 Cry 6/100 9594.34 87.76 134,97 4513,62 4434,92 3041,44 7226,07 1257,39 5025.39 0,00 0.00 0.00 -94.79G 5979633,91 588335,96 N 70.35418763 W 149.28267189 9600.00 87.73 134.63 4513.84 4435,14 3047.07 7231.72 1253.40 5029,40 6,00 -0,50 -5.98 -94.78G 5979629,97 588340.02 N 70,35415674 W 149,28263934 Well Design Ver 3,1 RT -SP3,03-HF2,03 Bld( d031 rt-546 ) Plan L-201 (N-U)IPlan L-201 (N-U)IPlan L-201L2 OBaIL-201L2 (P3) OBa Generated 3/412004 8:58 AM Page 1 of 2 Commonto I Me: I Inclination I AzImuth I TVD I Sub-S.. TVD I V.rtlcal I A~gH~ I NS EW I DLS I Bu~~ I W..~ I Too/F... I NorthIng Eatting LItItudo Longllud. SocIIon Dopartu.. (II) (dog) (clog) (II) (It) (II) (It) (It) (II) (dog/1001t) (cIog/1ooll) (cIog/1ooft) (dog ) (IIUS) (flUS) L-201 L2 Tgt 6 OBa 9667.32 87.40 130.60 4516.70 4436.00 3114,24 7298.98 1207,88 5078.88 6,00 -D.49 -5,99 -95,11G 5919585.00 588390.00 N 10.35403227 W 149,28223181 9100,00 87.23 128.64 4518.23 4439,53 3146,89 1331.63 1181.06 5104,03 6.00 -0.53 -5.98 -95.02G 5919564.48 588415,36 N 10,35397535 W 149,28203375 End Crv 9769.13 86,87 124,51 4521.19 4443.09 3215.19 1400.67 1145.93 5159.46 6.00 -D.51 -5.99 O.OOG 5919523.95 588411.26 N 10.35366288 W 149,28158390 Crv 61100 9821.11 86,87 124,51 4524.61 4445,91 3268.11 1453.23 1116.15 5202.77 0.00 0.00 0.00 11.31G 5919494.61 588514.89 N 10.35318146 W 149,28123241 L-201L2 Tgt 1 OBa 9884.13 87.70 126,95 4526,10 4448.00 3310.90 7496.14 1091,09 5237.61 6.00 1.93 5.69 11.05G 5919470.00 588550.00 N 10,35311293 W 149,28094972 9900.00 88.39 128.95 4527.90 4449,20 3346.12 7531.39 1069.42 5265.40 6,00 1,95 5.68 10.99G 5979448,64 588518.03 N 70.35365366 W 149,28072419 End Cry 9903.03 88.45 129.12 4527.99 4449,29 3349.15 1534.42 1067.51 5267.75 6,00 1,96 5.61 O.OOG 5979446.75 588580.40 N 10.35364845 W 149,28070509 Crv 6/100 10658.98 88.45 129.12 4548,47 4469,11 4104.13 8290,09 590.68 5853,99 0,00 0,00 0.00 28.16G 5978976.52 589111.85 N 10.35234461 W 149,27594836 L-201L2 Tgt 8 OBa 10669,42 89,00 129,42 4548,70 4470,00 4115.11 8300,53 584.07 5862.07 6,00 5,29 2.83 28,15G 5978970.00 589180.00 N 10.35232653 W 149,27588278 . End Crv 10619.46 89,53 129.70 4548.83 4470.13 4125.21 8310.56 577.68 5869,81 6,00 5.29 2.83 O.OOG 5978963.10 589181.81 N 10,35230906 W 149,27582001 Crv 61100 11223.14 89,53 129,10 4553.28 4414,58 4668.81 8854,23 230.31 6288,08 0.00 0,00 0.00 105,66G 5918621.09 589609.88 N 10.35135932 W 149,27242654 L-201L2 Tgt 9 OBa 11255.95 89,00 131.60 4553,70 4415.00 4701.61 8887.04 209.00 6312.97 6.00 -1,62 5.18 106,87G 5918600.00 589635.00 N 70.35130087 W 149.27222462 End Cry 11214,96 68.61 132,69 4554,09 4475.39 4720.66 8906,04 196,25 6321.06 6.00 -1,74 5.14 O,OOG 5916567.41 589649.23 N 70.35126600 W 149,21211030 Crv 6/100 11944,26 88.61 132.69 4569,63 4490.93 5389,04 9575.16 -257.45 6818,81 0.00 0,00 0.00 -91.51G 5978139.25 590146.01 N 10,35002537 W 149,26812101 L-201L2 Tgt 10 OBa 11989,12 88.60 130,00 4570,70 4492.00 5433,88 9620.01 -267,08 6652.54 6,00 -0.15 -6.00 -90.24G 5978110.00 590180,00 N 70,34994434 W 149,26184791 12000.00 88.60 129.35 4570.97 4492,27 5444,15 9630.88 -294,02 6660.90 6.00 -0.02 -6.00 -90.22G 5978103.15 590188,44 N 10.34992536 W 149,26778004 12100,00 88.56 123,35 4573.43 4494.73 5544,41 9730,65 -353,24 6941.39 6.00 -D.02 -6.00 -90.07G 5978044,84 590269,57 N 70.34916337 W 149,26712713 End Crv 12153.12 88,58 120,12 4574.76 4496,06 5591.61 9784,56 -381.48 6987.06 6,00 0.00 -6.00 O,OOG 5978011,11 590315.55 N 70.34966610 W 149,26675661 Crv 61100 12551.30 88,58 120.12 4584,61 4505,91 5989.18 10182.02 -580.94 1330,85 0,00 0,00 0.00 -166,91G 5977821.50 590661.50 N 70.34914030 W 149.26396742 L-201 L2 Tgt 11 OBa 12595,45 86,00 119,52 4586,70 4508,00 6032.58 10226,12 -602.87 7369,11 6,00 -5,84 -1.36 -166,61G 5977800.00 590100.00 N 10,34906029 W 149,26365104 12600,00 85,13 119.46 4581.03 4508,33 6037,04 10230.65 -605,10 7373.05 6.00 -5.84 -1.39 -166.61G 5977797.81 590103.91 N 70.34907418 W 149,26362503 End Crv 12623,29 84.36 119.13 4589.04 4510,34 6059,84 10253,86 -616,46 1393.29 6.00 -5.84 -1.40 O,OOG 5977786,68 590724.33 N 70.34904311 W 149,26346083 Crv 61100 12831.24 84.36 119.13 4609.42 4530,72 6263,01 10460.80 -711,20 7574.06 0.00 0.00 0.00 5.56G 5977687.91 590906.19 N 70.34876739 W 149.26199429 L-201L2 Tgt 12 OBa 12858.45 86.00 119.29 4611.70 4533,00 6289,71 10487,91 -130,43 7597.12 6,00 5.91 0.58 5.41G 5977675.00 590930.00 N 10.34813118 W 149,26180231 End Crv 12889.94 87.88 119.41 4613.38 4534.68 6320.61 10519,36 -745,86 1625,12 8,00 5.91 0.57 O,OOG 5977659,88 590951.51 N 10.34868896 W 149,26158001 TO 14-112" Lnr 13493,61 87,88 119.47 4635,70 4557.00 6913.11 11122,62 -1042.62 8150.34 0,00 0,00 0.00 O,OOG 5977369.00 591486.00 N 10,34781611 W 149,25731933 Leaal Descrløtlon: Northlna IY\ rftUSl Eastlna (X) rftUSl Surface 2591 FSL 3588 FEL S34 T12N R11E UM 5978320,84 583325,34 . L-201L2 Tgt 2 OBa 4823 FSL 544 FEL 534 T12N R11E UM 5980580,00 586340,00 L-201L2 Tgt 3 OBa 4680 FSL 302 FEL S34 T12N R11E UM 5980440.00 586584.00 L-201L2 Tgt 4 OBa 4390 FSL 5141 FEL 535 T12N R11E UM 5980155,00 587029.00 L-201L2 Tgt 50Ba 4085 FSL 4147 FELS35 T12N R11E UM 5919862.00 588021.00 L-201L2 Tgt 6 OBa 3603 FSL 3781 FEL 535 T12N R11E UM 5979585.00 588390,00 L-201L2 Tgt 70Ba 3666 FSL 3629 FEL S35 T12N R11E UM 5979470.00 588550,00 L-201 L2 Tgt 8 OBa 3119 FSL 3005 FEL 535 T12N R11E UM 5918970.00 589180.00 L-201L2 Tgt 9 OBa 2804 FSL 2555 FEL S35 T12N R11E UM 5978600.00 589635.00 L-201L2 Tgt 10 OBa 2301 FSL 2011 FEL S35 T12N R11E UM 5918110.00 590180,00 L-201L2 Tgt 11 OBa 1991 FSL 1501 FEL 535 T12N R11E UM 5977800.00 590700,00 L-201L2 Tgt 12 OBa 1863 FSL 1272 FEL 535 T12N R11E UM 5917615,00 590930,00 TDIBHL 1550 FSL 720 FEL S35 T12N R11E UM 5977369,00 591486,00 Well Design Ver 3,1RT-SP3,03-HF2.03 Bld{ d031rt-546) Plan L-201 {N-U)IPlan L-201 {N-U)IPlan L-201 L2 OBa1L-201 L2 (P3) OBa Generated 3/412004 8:58 AM Page 2 of 2 g o 8 ... ..... ~ ... 11 CD ~ o ~ Schlumberger WElL FIElD Prudhoe Bay Unit - WOA STRUCt\IOE L-PAD L-201 L2 (P3) --- MedII: 100M 2003 ""'- """"" lit N70212.e&t Lon: W14919Z4,511 NA027 AJ.b .... P\8neI, Zone (w, us Fell NøtNng: tIP7&320.t4ftUI GftdCOlw: +0.83113312" e.tIng; !83325.341tUS .... F8Ct O.M88OT8l72 - M ......l-201~ AM: L-201L2(P3 Oh o.r. M8Id'I tt, 2004 FS: 5755.3 "T otv. 10.122" M.tgDeo: +25.02" TVD R.f: AIMry T'" (71.10 It --. MSl) 1NyDMe: ..IIInI*)'0I.2004 o 1000 2000 3000 4000 5000 6000 4000 · . . . . . . . ...........................¡.....................................;.....................................¡.....................................¡..........................u..........j......................................,....................................¡.....................................;. ~_.._' '. .._~~" -·f~:~~··.._·, -.....-..- ~~·;;~~"~:~:~·~';;:·;~:-r-L.2ÕIL2·T;¡5 öii;·..;~;~:..··'·ë;;~~i~~~:-~·¡;:~~~·~~·;~:·;···.._···1···-..." -..-....,-......., r·'-··_··:.~~~~·~;·;~~~~l' ..... .._......~' " ..l~'iÓir¿,fÏi1oõBï..·Ê4·~1b..Ë~;ë;:,··.._..·r·..·~;;·;;~~·_··I·..~r~Z.._~~·~~-··1··..-~~;~~:..·t..;~;~~·_···..·.._..·..~~~~;r..··7.';~~-~~"."-"-r :::::::::::::...:'-:& -::::;:;:~~:~::!:'.V·"·t· ..····.._..·:;·:·..~..~::t;;::i.:~::· ";(/~·i::·r·::::;~· :··:;~;::::::~ii::::::~::::::::::::::::::::::::::i:~:::::::::::::":!:' -..-.....-..fj....... .......-.....................-..... "-17' ···..·..-..-..·..·..-..·..·..-··....1-\..·..-.. .......... lUŒIILU,L.I.1 .. ~I 1i. ~I" · nh, . .! /. . . I.. _.~"J ' -..-........... ........--...,. ,n. J¥" ". .........."W ".".".".""W.".".".". -.. .....-.....,...... ..........-.....~;. · UÞu·. "'.. . . , . ; ! Cry 8/100 : Cry 8/100 : Cry 8/10~ Cry 8/ioo .. ¡ ""'q ¡ ................. .... ....f.~~.~~.~.~~~~..........,......l...~:.~~.~~~.:.~.~.~~~..~~.~:...............~:~~~~~.~~.~f.~.~...~~~.~.~...~:~.~~.~,:~1?~...~~!!.!:~........k~O,I~Tm.1A.O'II.'....,!;M.Ç.!Y.Ç.\Y.~.10.q.....ß~!!!\.ç,~......... ..1. I I I I I I L.201L2 Till 12 OB. : B.~ Whlp01OCk; ; ; ¡ ¡ ¡ TO I <1-112" Lnr ; ~Mf I I ! ! ! ! ! 5000 o 1000 2000 3000 4000 5000 Vertical Section (ft) Azim = 130·, Scale = 1(in):1000(ft) Origin = 0 N/-S, 0 E/-W 6000 . 7000 4000 5000 . 7000 1600 ^ ^ ^ z =- 8 ex> ~ 800 ... 1\ Q) ~ (/) (/) v v v 0 Schlumberger WELL ..... Prudhoe Bay Unit - WOA 811WCtIM L-PAD L-201 L2 (P3) -...- Medel: 80Gt.l2003 1- stat: PllnL·201(N-U) ,..: L-20112(P3)Oh TW Ref: Aot8ry T.... (78.10 fI abIWe MIL) SrtyD...: .l8nt.-y0D,2004 Surf_Loc.tIon Lat: N70212.8&4 Lon: W,-4t 1024.511 NAD27 AIIIU StN~. Zone 04, US F... NortNng: ðU78320.... RUe Grid Corw:: ..0.83713312' E8IIIng: M332UUUS "'F..: O.1m9078812 DIp; 80.822' Mag Dee: +25.02" OeM; M81d11i.2004 FS: 5755.3 "T 2400 3200 4000 4800 5600 6400 7200 8000 2400 ~. N , '~~'J:';~;;'~~" ~:~~1~·~~:~~:~:....·....·..·..·..,!·....·....·..·..·....··,·,..·..·..··t....·..····'·..·..·..·............·'¡·........··..·..···..···......···..·t··......................,.,... ~~..···..·..··..···t·,··......·..·,....·.... . L·201I.2Tgt30B. ¡ ¡ ¡ ¡ -~ . '''9". ~ ''''N I i I ! 'f' ¡ C~eNOO ; I I I . . ............................j..................................~4.L.2.Tgt....08...;.~..-. ··..····..·,j'·'·'·if,,'··,.,~~,;·,.~..··....··..'Cr¥1JttOo·!··..·....··..···..·..···..··..·..·..t··....·..····..·....··..····..··..··!··....··......·······..····..·......t·..··......·····....... i I ! ':"'~'!'~! ! ! ¡ ¡ : L.2~11.2 Tgt 7 OBI : ......·....·....··........·l.....·..··....·..·....·.....···....T....·..·...···..·........···......f·.........·..·............·....··I....··....·!\?!!·!<\'!....·····..·..¡····.... ¡ ¡ ¡ ¡ Crv8l1j¡o ¡ ¡ 1 ¡ L·2011.2 Tgt; 081 : : : : ~nd Crv ¡ ¡ ¡ ¡ ¡ Crv8l100 ¡ ¡ ; : ; L·2011.2 Tgt 9 OB.i· .. ......... ...... ...........~ .......... ........... ... .......... ··r........·..· .............. ...... ....~ ...................... ··..··..··....r···......·..···..........··..·..·..1..··..·..·..···..·..··~~·ë~ ..·r~"'!· ...;,~....... ....····..1".·· .......... .... ........ ·········..·t". ................ ....... : : : : : : ¡ Crv 81100 ¡ i L·2011.2 Tgt 11 oris ¡ End Crv ¡ , Crv 8I1QO ·2011.2 191 12 OBI E1d Crv -800 TD /4-1/2" Lnr 2400 3200 4000 4800 5600 <<< W Scale = 1(in):800(ft) E >>> 6400 7200 8000 . 2400 1600 800 . o -800 . BPX AK Anticollision Report . Company: Field: Reference SUe: Reference Well: Reference· Wellpath: BP ArT1òc() Prudhoe Bay PB L Pad Plan C·201 (N-U) plan L-201 L2 OBa Date: 1/912004 Time: 11:14:57 Page: Co-ordinate(NE) ·Reference: Vertical (fVD)Reference: Well: Plan L-201· (N-U), True North L-201 Plan N-U 78.7 NO GLOBAL SCAN: Using Usei' defined selection & scan criteria Intel'Jlolatlon Method: MD Intel'Val: 50.00 ft Depth Range: 6329.00 to 13493.61 ft Maximum Radius: 1??oo.00 ft Reference: Errol' Model: Scan Method: Errol' Suñace: Db: Sybase Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cyfinder North Ellipse + Casing SUl'Vey Progr-am for Definitive Wellpath Date: 1/812004 Validated: No Planned From To SUl'Vey ft ft 28.50 6329.00 Planned: Plan #5 V1 (0) 6329.00 13493.61 Planned: Plan #3 V1 Venion: 2 Toolcode Tool Name MWD+IFR+MS MWD+IFR+MS MWD + IFR + Multi Station MWD + IFR + Multi Station ClUing Points MD TVD Diameter Hole Size Name ·.ft ft in in 3189.31 2638.70 10.750 13.500 103/4" 6421.00 4543.04 7.625 9.875 7-518" 14071.05 0.00 4.500 6.750 4 1/2" Summa!')' < Offset Wellpath :> Refel'e~e Offset Ctr~tr No-Go Allowable Site Well . Wellpath MD· . MD Distance Area Deviation Warning ft ft ft ft ft EX NWE#1 NWE1-01A NWE1-01A V4 Out of range EX NWE#1 NWE1-01 NWE1-01 V3 Out of range PB L Pad L-01 L-01 V14 7242.40 4900.00 4095.98 85.64 4010.34 Pass: Major Risk PB L Pad L-01 L-01 L 1 V2 Plan: Plan # 7242.40 4900.00 4095.98 85.65 4010.33 Pass: Major Risk PB L Pad L-02 L-02 V1 Out of range PB L Pad L-02 L-02PB1 V21 Out of range PB L Pad L-102 L-102 V2 10843.74 7950.00 712.53 171.60 540.93 Pass: Major Risk PB L Pad L-102 L-102PB1 V10 7804.89 3464.00 3180.67 86.17 3094.50 Pass: Major Risk PB L Pad L-102 L-102PB2 V2 7736.84 3464.00 3147.80 82.84 3064.96 Pass: Major Risk PB L Pad L-103 L-103 V23 8250.00 6450.00 844.78 137.22 707.57 Pass: Major Risk PB L Pad L-104 L-104 V7 11746.89 8550.00 1663.34 210.05 1453.29 Pass: Major Risk PB L Pad L-105 L-105 V4 8220.77 6000.00 2569.98 134.20 2435.78 Pass: Major Risk PB L Pad L-106 L-106 V14 7189.86 5350.00 2757.69 84.92 2672.78 Pass: Major Risk PB L Pad L-107 L-107 V14 8050.00 4250.00 4204.38 113.13 4091.25 Pass: Major Risk PB L Pad L-108 L-108 V18 6910.60 3650.00 4268.79 73.34 4195.45 Pass: Major Risk PB L Pad L-109 L-109 V12 6880.72 4600.00 5176.49 76.60 5099.89 Pass: Major Risk PB L Pad L-110 L-110 V11 6853.82 7700.00 8175.89 78.88 8097.01 Pass: Major Risk PB L Pad L-111 L-111V24 Out of range PB L Pad L-112 L-112V8 Out of range PB L Pad L-114 L-114 V14 Out of range PB L Pad L-115 L-115 V7 Out of range PB L Pad L-116 L-116 V10 Out of range PB L Pad L-117 L-117V11 Out of range PB L Pad L-118 L-118V9 6329.00 8400.00 2340.13 79.02 2261.12 Pass: Major Risk PB L Pad L-119 L-119V9 6411.92 6100.00 161.58 75.31 86.27 Pass: Major Risk PB L Pad L-120 L-120 V8 8234.25 6500.00 366.76 122.18 244.58 Pass: Major Risk PB L Pad L-121 L-121 V14 Out of range PB L Pad L-121 L-121A V1 6993.28 6250.00 7703.44 107.05 7596.39 Pass: Major Risk PB L Pad L-122 L-122 V5 Out of range PB L Pad L-21 0 L-210PB1 V7 9879.34 7250.00 830.00 102.01 727.99 Pass: Major Risk PB L Pad L-21 0 Plan L-210 V3 Plan: PI 10295.31 7700.00 599.17 135.98 463.20 Pass: Major Risk PB L Pad Plan L-113 (N-B) Plan L-113 V5 Plan: PI Oul of range PB L Pad Plan L-123 (N-R) Plan L-123 V1 Plan: PI 8139.18 6850.00 224.99 119.11 105.88 Pass: Major Risk PB L Pad Plan L-124 (N-C) Plan L-124 PB1 V1 Plan Out of range PB L Pad Plan L-124 (N-C) Plan L-124 V1 Plan: PI Out of range PB L Pad Plan L-2oo (N-M) Plan L-2oo OBd V1 Plan Out of range PB L Pad Plan L-2oo (N-M) Plan L-2ooL 1 OBa V3 PI Out of range PB L Pad Plan L-2oo (N-M) Plan L-200L2 OA V2 Pia Out of range PB L Pad Plan L-201 (N-U) Plan L-201 OBd V1 Plan 6349.99 6350.00 0.37 78.27 -77.90 FAIL: Major Risk PB L Pad Plan L-201 (N-U) Plan L-201L 1 OBb V2 PI 12884.03 12900.00 32.71 199.57 -166.86 FAIL: Major Risk PB L Pad Plan L-211 (N-H) Plan L-211 V1 Plan: PI Out of range -294 ··..·..·200 "100 -0 -100 --200 --294 27(} ðl Field: Pr\.._aioe Bay Site: PB L Pad Well: Plan L-201 (N-U) Wellpath: Plan L-201L2 OBa \ \ .. ., , '- " ..' .,' " " '~"""". "- "- ......", " ' '~'''''''''' .. .. 180 g.¡ Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [100ft/in] . 90 . e e PERMIT TO DRILL 20 MC 25.005 (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary well bore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent well branch, the application for a Permit to Drill need only include information under (c) of this section that is unique to that branch and need not include the $100 fee. . . TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELLNAME~~úf ¿- ;2.0/ L ~ PTD# 20"1 - Ot¡? )< Development Service CHECK WßA T APPLIES ADD-ONS (OPTIONS) MULTI LATERAL x (If API num ber last two (2) digits are between 60-69) Pß..,OT (PH) Exploration Stratigraphic ~'CLUEn Tbe permit is for a new wellbore segment of existing well I'ð t-t.t.. - 2ð .I Permit No, 2os.--ôSo'¢I No. :k>~t>2.1-- <.32..0 a.... Production sbould continue to be reported as a function' of the original API number. stated a hove. HOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for tbe pilot bole must be clearly differentiated In both name (name on permit plus PH) and API Dumber (SO 70/80) from records, data and logs acquired for well (name on permit). SPACING EXCEPTION DRY DITCH SAMPLE The permit is approved subject ·to fuD compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to tbe spacing exception tbat may occur. An dry ditcb sample sets submitted to tbe Commission must be in no greater -tban 30' sample intervals from below tbe permafrost or from where samples are first caugbt and 10' sample intervals through target zones. PTD#: 2040480 Administration Well bore seg Annular Disposal Appr Date RPC 3/8/2004 Engineering Appr Date WGA 3/8/2004 Geology Appr RPC Date 3/8/2004 Geologic Commissioner: ~rS Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Company BP EXPLORATION (ALASKA) INC Initial ClasslType 1 P~rmitfee attaçhe~_ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ 2Leas~_number_appropriale_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ 3 _U_nique weltn_a[T1~_atld Ol!mb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4 WeJUocat~d ina_d.efine~ppol. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ 5 WellJocat~d pr_operdistance_ from driJling unitb_ound_a!y_ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 6 WellJocat~d proper _distance_ from other welJs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 7 _S_uffiçientaçreageayailable [ndriUilJg unjt .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 8 Jf.d~viated, js_ weJlbore plç¡tincJuded _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 9 _Operator only affeçted party _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 10 _Operator bas_apprppr[ate_bond inJorçe _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 11 P~rmil c.atl be iSSl!eçl without conservation order _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 12 P~rmil c_an be iSSl!eçl without ad_ministrathle_apprpvaJ. _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 13 Can permit be approved before 15-day wait Yes 14 WelUocaled within area aIJd_strç¡ta _authorized by lojeçtiPIJ Ord~r # (puUO# in_cp[T1[T1eots).{forNA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 15 AJI welJs_witpio_1l4_llJile_area_of reyiew id~lJt[fied (Fpr sefVj~.w.ell only) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 16 Pre-produ.ced. itljector; ~uralion.of pre-pro~uçtion I~Ss. than_ 3. months_ (for_service well onJy) _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 17 ACMPF:indjng.of Co n_si.ste tlcy has bee.n.is.sued.for.this proieçt _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 18 _C.ooductor string_provided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 19 _S_urfac~ _casing protects. alLkoown_ USOWs _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 20 _CMTvotadeQuate.to çircJJtate_oo_conduçtor_& surfcsg _ . _ _ _ _ _ _ . _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 21 _CMT vol. adeQl!ate.to tie-inJongstritlg to surf çsg_ _ _ _ _ _ _ _ _ _ _NA _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 22CMTwill coyeraJl kno.w.n-Pfo_ductiye horizons_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ __No _ Slotte_d. _ _ _ _ _ _ _ _ _ _ . _ _ _ 23 _C_asiog desigtls adequa_te fpr C,T, B_&. permafrpst _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 24 A~equate_tanhge_or re_serve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ .Y~s _ _ _ _ _ _ _ Nab_ors.9_ES. _ _ _ _ _ _ _ _ _ _ _ _ _ _ 25 Jf.aJe-drilt has a 10A0;3 for abançlolJment be~1J apPJoved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ Quadlateral._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 26 Adequale.w.eJlboresepÇ1ratio_nproposeçl_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~S _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 27 Jf.divecterreq.uired, does jtmeel reguJa_tions_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ Siçletrack;. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ 28 _DriUilJgflujd.programsc.hematic&eQ.uipJistadequat~ _ _ _ _ _ _ _. _ .Y~s _ _ _ _MaxMW_9,2ppg,_ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ 29 .BOPEs,_dothey meelreguJa_tion _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . 30 _BOPEpressratiog appropriate; _tesHo(put PSig in _comments) _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ Test tp3500_ ps[.I\lIS~ 1680 psi.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ 31Choke_llJanjfoldçompJies.w/APtR~-53.(MayS4) _ _ _ _ . _ _ _ _ _ _ _ . _ _ Yes _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ 32 Wo~ willpccur withputoperç¡tjon_shutdow.n_ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ Yes_ 33 JspresetlceofH2Sgas_prob_able_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . No_ 34 Me.chan[cç¡Lcpodjt[otl pf wells within ,L\OR yerified. (For_s_ervjce welJ onJy) _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ . _ _ Well Name: PRUDtlOE BAY UN ORIN L-201L2 _Program DEV DEV /1-0IL GeoArea 890 Unit 11650 On/Off Shore On - - - - - -- - - - - - - ~ - - - - - - - - - - - - - - - - - ~ - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - -- 35 P~rmil c.atl be iSSl!eçl wlo hyçlrogen. sulfide meaSJJres _ _ _ _ 36 _D_ata.preselJted on_ potential pveJRres_sure _zone.s_ 37S~ismic_aoalysjs of shaJlow gaszPlJes _ _ _ _ _ _ 38 _S~ç¡bedconditipo survey.(if off-shore) . 39 _ Contact namelpPOIJeJorweelsly prpgress_reports [explorç¡tp _ _ Yes _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NA . _ NA _NA NA - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - -- - - - - - -- - - - - ~ - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Date: Engineering Commissioner: "ijtþf - - - - - - - - - - - - - - - - - - , - - - - - - - - Date i-j~ /4- ~ D . .