Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-048
e e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~Q Lt- - 0 If is Well History File Identifier
Production Scanning
Stage 1 Page Count from Scanned File: 8" Lf- (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
Date: ro /1 ( ð fo
Organizing (done)
~o-sided 11111111I1111111111
RESCAN
DIGITAL DATA
~skettes, No. \
D Other, NolType:
D Color Items:
D Greyscale Items:
D Poor Quality Originals:
D Other:
NOTES:
BY:
~
Date &11100
Date 01 q /0 fa
c2. x 30 = & D
Date & /q / 0 b
Project Proofing
BY:
~
Scanning Preparation
BY:
~
BY:
~
Stage 1
If NO in stage 1, page(s) discrepancies were found:
BY:
Maria
Date:
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Maria
Date:
Comments about this file:
D Rescan Needed 1/111111111" 111111
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a large Scanner
OVERSIZED (Non-Scannable)
D logs of various kinds:
D Other::
151
VV\f
11I111/111I111 "III
ý\l\f
+ ;;l3 = TOTAL PAGES <6 ð
(Count does not include cover sheet) YV\J{)
151 Ir-
151
11111111111I11 "III
151
NO
V\1f
YES
NO
151
11I11111111I11 "III
'" 11111111111 "III
151
Quality Checked
111111111111111111I
10/6/2005 Well History File Cover Page.doc
•
F _~
~~-_-~
MICROFILMED
03/01 /2008
DO NOT PLACE
~'y',..
.$
°,;
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs_Inserts\Miicrofilm Marker.doc
~\/ED
11/08/06
Sc..rgep
NOV 1 3 2006
NO. 4029
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: Alaska Oil & Gas Cons Comm
Altn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Orion
Well
JOb #
log Description
Date
BL
Color
CD
V-204L1 40010781 OH EDIT OF MWD/LWD 08114104 1 1
V-204L 1 PB1 40010781 OH EDIT OF MWD/LWD 08/14/04 1 1
V-204L2 40010781 OH EDIT OF MWD/LWD 08122/04 1 1
V-204L2 PB1 40010781 OH EDIT OF MWDILWD 08122/04 1 1
V-204PB2 40010781 OH EDIT OF MWDILWD 08/09/04 1 1
V-204L3 40010781 OH EDIT OF MWDILWD 08/28104 1 1
L-201 40010303 OH EDIT OF MWD/LWD 04/03/04 2 1
L-201 PB1 40010303 OH EDIT OF MWD/LWD 03/30/04 2 1
L-201 PB2 40010303 OH EDIT OF MWD/LWD 04101/04 2 1
L-201L1 40010303 OH EDIT OF MWD/LWD 04/09/04 2 1
L-201L2 40010303 OH EDIT OF MWDILWD 04/19/04 2 1
L-201 L3 40010303 OH EDIT OF MWD/LWD 04/26/04 2 1
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc,
Petrotechnical Data Center LR2-1
900 E Benson Blvd
Anchorage AK 99508-4254
Schlumberger·DCS
2525 Gambell St. Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Date Delivered:
Received by'
.
£Jö4-o4~
1Þ ,'-la-3d..
<.:)
{:'
">ò ~ ~
DATA SUBMITTAL COMPLIANCE REPORT
4/24/2006
Permit to Drill 2040480
Well Name/No. PRUDHOE BAY UN ORIN L-201L2
Operator BP EXPLORATION (ALASKA) INC
JpttrL Ie.¡ A.,~ð bf(
API No. 50-029-23202-61-00
MD
13490 ,/
TVD 4623
,.
Completion Date 4/30/2004 ~
Completion Status
1-01L
Current Status 1-01L
UIC N
--
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR I RES / Azimutal DEN / NEW / AIM / PWD
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
lED D Asc Directional Survey
~t Directional Survey
Well Cores/Samples Information:
(data taken from Logs Portion of Master Well Data Maint
Log Log
Scale Media
Run
No
Interval
Start Stop
OHI
CH Received Comments
5m2004
5/7/2004
.
I
J
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
ADDITIONAL INFOR~.I10N
Well Cored? ~
Chips Received? ~
Daily History Received?
~
Formation Tops
Analysis
Received?
~
-~_..-
.
~~----
Comments:
~
Date' . d-l r1i¡~.~
Compliance Reviewed By:
Andy,
Open hole log data is missing for the following wells:
PBU Orion L-201 50-029-23202-00
PBU Orion L-201 L 1 50-029-23202-60
PBU Orion L-201 L2 50-029-23202-61
PBU Orion L-201 L3 50-029-23202-62
Please submit to the Commission as soon as possible;
Open Hole digital log data ( LIS, DLlS, or LAS)
Open Hole Blue line logs
Open Hole reproducables - sepia/mylar or digital graphics files (.pds or .pdf or .emf)
TNX for your help.
Howard
~
\)11&
www.PetroleumNews.com
-. NORTH SLOPE
J<V4- - O~
Î'of3 i /0 t
PETROLEUM NEWS 9
p~~_k;¡
BP completes
quad-lateral at Orion
Drilling end of viscous equation appears solved; production of heavy oil still
an issue because of sand produced with oil and well maintenance issues
By KRISTEN NELSON
PClroleulI! News Edilor-in-C/lie!
The viscous oil resource on Alaska's North Slope
- like the natural gas resource there - has
been known fOI! decades, but heavy oil has been
as stranded as gas, stranded in the ground
through lack of the technology and knowledge neces-
sary to produce it.
BP Exploration (Alaska) has been working on
ways to produce viscous oil, also referred to as heavy
oil, at Milne Point since the 1990s and now also has
viscous oil under t!cvclop-
ment. in the western Prudhoe / 1. /2 )\¡~:iV
satellItes. ... .......
" Multi-lateral horizontal S E R I E S
wells have solved thc drilling
sit!e of the viscous equation,
but problems remain on the production side, members
of BP Exploration (Alaska)'s drilling team told
Petroleum News in late September.
Viscous oil accumulations lie closcr to the surl[lce
and are colder, less mobile and have poorer reservoir
quality than conventional crude oil, said Mik Triolo,
Greater Prudhoe Bay operations drilling engineer.
Triolo worked the Schrader BlufTviscous aceumu-
lationat Milne Point before moving over to Orion,
working on the early multi-lateral and horizontal well
designs in late 1999, early 2000. "And we've progres-
sively evolved that technology ever since," he said.
That work is continuing at Orion, a Prudhoe Bay
western satellite viscous oil accumulation. Multi-lat-
eral wells, well bores with multiple holizontallaterals
into shallow sands containing viscous oil, make wells
productive enough to be economic.
First tri-Iateral in 2003
In 2003, BP drilled the first tri-Iateral multi-lateral
well on the slope, and this year, the company set a
world record with a quad-lateral well.
"Horizontal multi-lateral wells have been the key
to unlocking those (viscous) reserves... predominate-
ly through efficient geo-steering within the segregated
sands... Rather than undulating through them," Triolo
Abóutthe series
Editor s Note: Members of BP
}.xploration (Alaska) s drilling group sat
down with Petroleum News Sept. 28 to talk
about the companys development drilling
program, recent drilling records and about
the technology that is driving the company s
North Slope development drilling. Part.l of
this story, printed in the Oct. 10 issue of
Petroleum News. included an overview of the
company s North Slope drilling activity and
an update on its coiled tubing drilling pro-
gram. Part 2. which appeared in the Oct. 24
issue, described multi-lateral drilling at
Milne Point, and well maintenance work.
said, "we actually stick dedicated laterals into each
onc of the sand intervals." In addition to better ability
to steer through the fonnations, drilling also helps vis-
cous oil development with "good well design," he
said.
A crucial part of thc well is where the laterals
branch [¡-om the main well bore, and BP has also been
trying dilTerent junction designs, the connection
between the main well bore and (he lateral.
At Milne Point BP detennined "that the level three,
the TAML level three junction, was the junction of
choice.. .," Triolo said. lAML stands for Technical
Advancement of Multi laterals, an organization set up
to regulate "the diffèrent levels of multilateral junction
equipment such that everything is standardized," he
sait!o "So if Baker comes out with a level-three junc-
tion, the eliteria that are set up to distinguish between
a level-three and a level-fow, are the same as for
Halliburton.. ."
The TAML levels, said Mark Johnson, BP senior
coiled tubing drilling engineer, "refer to the re-ently
capability of the jtUlction and how well it seals or iso-
lates at that junction." Re-entry capability and the seal
see BP page 10
~~
10
, . 11Ì~[']~.
continued from page 9
BP
:î
:.<:
~
~
z
o
, provided are the two primary things a jlU1C- ~
tion does, he said. ~
Triolo said BP determined "that we did ~
not need isolation at the junction - what we ~
needed was access to the lateral, so the level- ?;;
three junctions became the method of ~
::¡
choice." 8
First level..three,
quad-lateral wen in world
BP took its experience at Milne Point to
Orion, a westem Prudhoe Bay satell ite, and
this year "we drilled the first level-three
quad-lateral multi-lateral well in the world,"
Triolo said. (The accompanying graphic
illustratcs such a quad-lateral multi-lateral
well.)
BP's initial experience with multi-lateral
wells was that complicated wells were
. I
expensive for the wells group to maintain:
"We didn't really have cost-efTective ways
to work on the wells or impact the flow
streams of the wells later in life, so we went
back to the drawing board and came up with
some criteria that we wanted to see achieved
in our well designs, and then worked with
our ~endors to come up with a solution to
those problems."
The current system, he said, was "proved
up in Milne Point" and the junction design
was modified at Orion "to add more em-
ciency to the full life-cycle cost of the well,"
Triolo said. Well work can now be done
through the tubing, with a coiled tubing unit,
without the need for a workover rig.
The total footage in the quad-lateral wcll,
Prudhoe Day unit L-20 1, was almost 35,000
feet, with "almost 28,000 feet of horizontal
footage within these thin bcddcd sands,"
more than five miles of horizontal footage in
one well, Triolo said.
There were cleanup issues with the well,
and BP didn't realize full How potential, but
the well had a productivi(y index of 40 (a
measure of barrels pcr pound of square inch
drawdown), compared to most wells on the
slope somewhere in the 20-range.
"If we could have opened it up rull bore,
we probably would have been somewhat
tubing limited," he said.
Futility limited
Right now the wcll is f~lcility limited,
Triolo said. Daren ßeaudo, UP's director of
public affairs, said one of the things 8P
worked on during the summer production
~ÆYJñr,AWA;f,.
VISCOUS 011. ~UAD fltL COMPLETION
.. j~
~1
d)
.. fll
.&
ill
..l
:ií!:
-....
~
shutdown at Prudhoe Bay was cleaning sand
out of tanks in Gathering Center 2. "One of
the constraints that we've had is managing
all of this sand," he said.
"This is a viscous oil production issue,
not a well-rate issue," 13eaudo said, and the
issue is the sand produced with the viscous
oil. To really produce viscous to the maxi-
mum, BP will either have to add facilities to
handle sand that comes to the surface or find
a way, such as screens, to keep the saud in
the rcsclvoir.
Not only does sand accumulate in pro-
duction facilities, said Andy Kirk, 8P's
Alaska drilling and wells perfonnance con-
sultant, but it also causcs problems in
pipelines because it is corrosive - another
reason to keep it in the fonnation.
And if a multi-lateral well has to be shut
in and the oil stops flowing, Kirk said, the
sand can layout along the horizonlal portion
oflhe well, creating dunes which plug up the
well, making it difficult to re-establish pro-
duction when the well is brought back
online.
Opportunity huge
The opportunity for viscous' is huge:
'-.,.
,~}Jjt!!;;-,~~~~Féi~~:;"t-~;:~~~.ç-~;4:D
~L ~7~~~~<1r:~~;,.~c;¡[~J'®
some 1.6 billion barrels recoverable with
current technology, said Gary Christman,
UP's Alaska drilling and wells manager.
"We're going through kind of a concept
selection phase '" and one of the things
that we don't know is how we're going to
handle all this production, because it is dif-
ferent. "
"This multi-lateral technology has
unlocked the flow potential," said Johnson.
"now we can finally gel that reservoir to
now at economic rates - and that's bccn
the challenge for the last 20 years. .., "
There are other issues now connected
with getting viscous production to the sur-
H1Ce, "but the key thing is that this multi-
lateral has unlocked viscous oi\."
Christman said the horizontal footage
drilled in the quad-lateral well, thc 25,000-
feet or horizontal hole, has "not been done
anywhere clse in the world: it's just huge,
just huge stuff."
The issues, now, Christman - said, are
sand control and long-term serviceability of
the multi-lateral wells: "The multi laterals
arc there, but do we know we can keep
them all producing for many, many years?
"It will be a sand control issue... And
~Dlf-04-''6
PETROLEUM NEWS · WEEK OF OCTOBER 31, 2004
"Horizontal nlulti-Iateral wells
have been the hey to unloching
those (viscous) reserves...
predominately through efficient
geo-steeling within the segregated
sands... Rather than undulating
throug~~ theIn, we actually stich
dedicated là!erals into each one of
the sand intervals."
- Mik Triolo, BP Exploration (Alaska)
drilling engineer
long-tenn well selVieeability," he said.
Well design evolved here
The men said this is a slope-wide effort,
with a slope-wide viscous team including
BP, ConocoPhillips and ExxonMobil,
working the viscous development issue,
and contractors for the fIrms developing the
technology being used.
Triolo said that while the well design in
use at Orion was evolved at ill', "we've
also shared this well design with
ConocoPhiIlips and so they're using it on
their development," and ConocoPhillips is
"learning things over there that they're
sharing with us," as part ofthe regional vis-
cous team. ConocoPhillips operates the
Kuparuk River unit viscous West Sak
development effort.
The quad multi-lateral has been drillcd,
and a quintuple multi-lateral is planned for
later this year, Triolo said, the first such
well on the slope. That well, however, is
not planned with five junctions coming out
from the main well bore, because "some of
these sands arc so thin that they cannot eco-
nomically support the cost of a multi-later-
al junction," so coiled tubing technology
will be used to do an open-hole junction.
Four laterals will come ofTLhe main wel!
bore; one of those laterals will split again.
The whole well will be drilled with a
rotary rig, Triolo said, but will usc some
coiled-tubing developed technology, scaled
up in size to rotary applications.
Some of that technology was developed
for use over at Kupamk, he said, so there is
technology sharing among lhe di fTerent
drilling groups, as well as between 131' and
ConocoPhillips.
Drilling, selViccs and materials contrac-
tors responsible for technology for BP's
drilling program include: 13aker Hughes
lnteq; Doyon Drilling; Halliburton; Nabors
Drilling; Nordic Calista Drilling;
Schlumberger; and WellTec Tractor. .
) STATE OF ALASKA ')
ALASKA OIL AND GAS CONSERVATION COMI'VIISSION 'Iir':,.;:
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised: 'U1j28/b4~il~~~lQ~ Production
,h V\l:èll Class:
II Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
204-048
13. API Number
50- 029-23202-61-00
14. Well Name and Number:
t
1a. Well Status: II Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD / GR / RES / Azimuthal DEN / NEU / AIM / PWD
CASING, LINER AND CEMENTING RECORD
1,:I::S¡;;"E/UI~P',;.Q,;~tffl:;MØ:t!;'I:a~$:rI'~q;:D,E~t~I,'~ø'lil':I:'i'I:!.I:,8:ó'~~,II'I!'I!:'
':"'·'II'!~I;Øel"l:i::·I" il:sb:r~bM;:f'i:.I"I~;I~o'l?""I~,1è,otJØMI::IJ;';;IIII'i.!:$I2;I:2"I;'IIII}::11
Surface 108' Surface 108' 48" 260 sx Arctic Set (Approx.)
29' 3197' 29' 2642' 13-1/2" 630 sx AS Linte, 355 sx Class 'G'
27' 6229' 27' 4514' 9-7/8" 613 sx Class 'G'
6224' 13448' 4513' 4622' 6-3/4" Uncemented Slotted Liner
5982' 6200' 4412' 4504' N/A Uncemented Tieback Liner
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM
Top of Productive Horizon:
57' NSL, 1503'WEL, SEC. 34, T12N, R11E, UM (OBa)
Total Depth:
1470' NSL, 4566' EWL, SEC. 35, T12N, R11E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 583325 y- 5978321 Zone- ASP4
TPI: x- 585375 y- 5981083 Zone- ASP4
Total Depth: x- 591494 y- 5977288 Zone- ASP4
18. Directional Survey II Yes 0 No
22.
~': 01!,:"!I:'" ':',., 'f?"", '11'1,,',,'.1"" ','¡II';":: :!" .'~ 1",11
",I: : III~A§.I~,~, "II,i "1,111
,:,1"",,1 ::;:':,':~:::::,' i,!I;~'~~~'i:f';~';':': 1:';", ':':,;:':,::
20" x 34"
215.5#
45.5#
29.7#
12.6#
12.6#
A53
L-80
L-80
L-80
L-80
10-3/4"
7-5/8"
4-1/2"
4-1/2"
23. Perforations op'en to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Section
MD TVD MD TVD
6295' -13405' 4534' - 4621'
One Other
5. Date Comp., Susp., or Aband.
4/30/2004
6. Date Spudded
4/14/2004
7. Date T.D. Reached
4/19/2004
8. KB Elevation (ft):
78.7'
9. Plug Back Depth (MD+TVD)
13490 + 4623
10. Total Depth (MD+ TVD)
13490 + 4623
11. Depth where SSSV set
(Nipple) 2266' MD
19. Water depth, if offshore
N/A MSL
SIZE
4-1/2", 12.6#, L-80
PBU L-201 L2
15. Field / Pool(s):
Pr~dhoe Bay Field / Orion
Ft
Ft
16. Property Designation:
ADL ADL 028238
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
":,I~M"G¡'¡N11::':/
1"L:I"II'II""11::r;'I':~"III.I¡.":I'11
::lli'IIßQ[ITEd:'"
DEPTH SET (MD)
6000'
PACKER SET (MD)
5873'
\B1MS 8FL
Form 10-407 Revised 12/2003
CONTINUED ONCl~l sG \ N ^ L
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 150 Bbls of Diesel
GAs-McF
51
WATER-Bsl
21
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
June 28, 2004 Gas Lift
Date of Test Hours Tested PRODUCTION FOR Oll-Bsl
7/9/2004 2 TEST PERIOD -+ 203
Flow Tubing Casing Pressure CALCULATED ........ Oll-Bsl
Press. 70C 1,300 24-HoUR RATE""" 2,432
GAs-McF
607
W A TER-Bsl
249
CHOKE SIZE GAS-Oil RATIO
75 249
Oil GRAVITY-API (CORR)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
JUl 2 tj
~ ~.'~ . I
,:--:
\~,}t\ ~ 9
(,',
19f
1'8.'
)
GEOLOGIC MARKERS
29.
)
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OBa
6228'
4514'
None
Schrader Bluff OBb
10960'
4572'
Schrader Bluff OBa
11110'
4588'
Schrader Bluff OBa
11568'
4579'
Schrader Bluff OBa
11780'
4576'
1111 ")00 K,
l> /,' ,ii,
30. list of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~.~ TiUe Technical Assistant Date 07-d..ß-()tf
PBU L-201 L2 204-048 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Michael Triolo, 564-5774
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMIŠSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD / GR / RES / Azimuthal DEN / NEU / AIM / PWD
CASING, LINER AND CEMENTING RECORD
S~J!ftNG: :O~prH,MP:.'.··.· ,1,ßEJ;ëJ\I~~:DFÄt~I'WP'" "'I¡:'hfOLI;¡,·.',.'¡
, ·iTdp':li:.,~:;BbnGM·· ';,I:,i¡liT51?:¡,il:,B,bW0M' :,,¡:' iIIS,I¿EI\':;~i!
Surface 108' Surface 108' 48" 260 sx Arctic Set (Approx.)
29' 3197' 29' 2642' 13-1/2" 630 sx AS Linte, 355 sx Class 'G'
27' 6229' 27' 4514' 9-7/8" 613 sx Class 'G'
6224' 13448' 4513' 4622' 6-3/4" Uncemented Slotted Liner
5982' 6200' 4412' 4504' N/A Uncemented Tieback Liner
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name: .
BP Exploration (Alaska) Inc. :
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2598' NSL, 3588' WEL, SEC. 34, T12N, R11 E, UM
Top of Productive Horizon:!}? tf1./
57' NSL, 1503'WEL, SEC.~, T12N, R11E, UM (OBa)
Total Depth:
1470' NSL, 4566' EWL, SEC. 35, T12N, R11E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 583325 y- 5978321 Zone- ASP4
TPI: x- 585375 y- 5981083 Zone- ASP4
Total Depth: x- 591494 y- 5977288 Zone- ASP4
18. Directional Survey 181 Yes 0 No
22.
CASING,
SIZE
II, ' ",1,' ',I
,,' ? ~,:, 1:1,':., :<.,; ': ';, ,. :: : I;' '-:,;
:: I'W~;'P!ËF('IFT. .....,
215.5#
45.5#
29.7#
12.6#
12.6#
I , 'I I
I I" ···'·'11...··..'.·.,1,
," ,Ç3RADE;,'"
A53
L-80
L-80
l-80
l-80
20" x 34"
10-3/4"
7-5/8"
4-1/2"
4-1/2"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Section
MD TVD MD TVD
6295' -13405' 4534' - 4621'
26.
Date First Production:
Not on Production Yet
Date of Test Hours Tested
One Other
5. Date Comp., Susp., or Aband.
4/30/2004
6. Date Spudded
4/14/2004
7. Date T.D. Reached
4/19/2004
8. KB Elevation (ft):
78.7'
9. Plug Back Depth (MD+ TVD)
13490 + 4623
10. Total Depth (MD+TVD)
13490 + 4623
11. Depth where SSSV set
(Nipple) 2266' MD
19. Water depth, if offshore
N/A MSL
SIZE
4-1/2", 12.6#, L-80
25.:
1 b. Well Class:
181 Development 0 Exploratory
o Stratigraphic Test 0 Service
12. Permit to Drill Number
204-048
13. API Number
50- 029-23202-61-00
14. Well Name and Number:
PBU L-201L2
15. Field / Pool(s):
Prudhoe Bay Field / Orion
Ft
Ft
16. Property Designation:
ADL ADL 028238
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
':AMO~~T:II,I
:, ii: PULLED, I'
DEPTH SET (MD)
6000'
PACKER SET (MD)
5873'
'.AqID,FRAÇTGR~, I.CEMENI,9PIJ~eZE"ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 150 Bbls of Diesel
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
Oll-BBL
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". R E C; E ~ \/E 0
None
JUN 022004
PRODUCTION FOR
TEST PERIOD -+
Flow Tubing Casing Pressure CALCULATED ....... Oll-Bsl
Press. 24-HoUR RATE""'"
27.
: ~~~f.
'.' Ao/ ¡
: "-''rT""'i'' V ~ ...
Form 1 0-407'~ev¡s'êd""1~l2003
\ØMS Bfl
GAs-McF
W ATER-BsL
GAs-McF
WATER-BsL
,}\~~ 0 8, rynn ~
CHOKE SIZE
GAS-OIL RATIO
OIL GRAVITY-API (caRR)
CONTINUED ON REVERSE SIDE
A¡as;!.\a m¡ ,~, 8:15 Cons. ComHlission
Anchorage U RIG I N A __ G J::
)
')
28.
GEOLOGIC MARKERS
29.
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OBa
6228'
4514'
None
Schrader Bluff aBb
10960'
4572'
Schrader Bluff aBa
11110'
4588'
Schrader Bluff aBa
11568'
4579'
Schrader Bluff aBa
11780'
4576'
30. list of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~AJ\i..p~ ~ Title Technical Assistant Date o(p-oa-ol(
PBU L-201l2 204-048 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Michael Triolo, 564-5774
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
SRE*Pl...QR.A.TION
leak-Off Test Summary
1
Legal Name: L-201
Common Name: L-201
Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure' (BHP) EMW
3/21/2004 LOT 3,197.0 (ft) 2,642.0 (ft) 9.20 (ppg) 575 (psi) 1 ,838 (psi) 13.39 (ppg)
3/27/2004 FIT 7,047.0 (ft) 4,673.0 (ft) 9.20 (ppg) 680 (psi) 2,913 (psi) 12.00 (ppg)
4/5/2004 FIT 6,372.0 (ft) 4,562.0 (ft) 9.20 (ppg) 665 (psi) 2,845 (psi) 12.01 (ppg)
4/14/2004 FIT 6,229.0 (ft) 4,514.0 (ft) 9.20 (ppg) 660 (psi) 2,817 (psi) 12.01 (ppg) ~
4/23/2004 FIT 6,025.0 (ft) 4,440.0 (ft) 9.30 (ppg) 646 (psi) 2,791 (psi) 12.10 (ppg)
-'
Printp.rl' 5/31200.1 8°.1<;:51 M-"
)
)
", ". ~ .... ,. .
8P EXPLORATION
',' . .' . ,," .", ". .~. 'r
,,'Op~r.atiøns S4mmary Report
Page 1 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
. Date From - To Hours Task Code NPT Phase Description of Op~rations '
3/16/2004 12:00 - 14:00 2.00 MOB P PRE Blow down steam and water lines. Rig down for move. lay rig
mats on L-201
14:00 - 15:00 1.00 MOB P PRE Move camps and pits.
15:00 - 16:00 1.00 MOB P PRE Move rig off of L-211 and position on L-201
RIG ACCEPTED @ 16:00 hrs
16:00 - 19:30 3.50 RIGU P PRE NU diverter, riser and Hydril.
19:30 - 21 :30 2.00 RIGU P PRE Level rig and pits
21 :30 - 00:00 2.50 RIGU P PRE RU pits. Position Swaco unit and cuttings tank.
3/17/2004 00:00 - 01 :00 1.00 RIGU P PRE Load BHA #1 in pipe shed. Continue NU diverter, riser and
Hydril.
01 :00 - 04:30 3.50 RIGU P PRE Take on water and build spud mud. Change out riser
04:30 - 06:00 1.50 RIGU P PRE Change out top drive quill for 5" DP
06:00 - 07:00 1.00 RIGU P PRE PU Jewelry for BHA #1
07:00 - 10:30 3.50 RIGU P PRE MU 35 stands of 5" DP and stand back in derrick
10:30 - 12:00 1.50 RIGU P PRE MU HWDP and Collars, stand back in derrick.
12:00 - 17:30 5.50 RIGU P PRE Move 105 joints of 5" DP into pipe shed. MU 35 stands, stand
back in derrick.
17:30 - 18:30 1.00 RIGU P PRE MU BHA #1
18:30 - 19:00 0.50 BOPSUF P PRE Function test diverter. Witness of diverter test waived by John
Crisp with AOGCC.
19:00 - 19:30 0.50 RIGU P PRE Pre-spud meeting with Anadrill, MI, Sperry, GyroData and all
rig personnel.
19:30 - 20:00 0.50 RIGU P PRE RU Sperry WL unit and GyroData for gyro surveys.
20:00 - 21 :00 1.00 RIGU P PRE Finish MU BHA #1. Orient motor and MWD
21 :00 - 21 :30 0.50 DRILL P SURF RI H and tag up at 108'. Fill stack. Circulate mud system
checking for leaks.
21 :30 - 00:00 2.50 DRILL P SURF Drill 13-1/2" surface hole from 108' to 170'.
RPM = 50
Torque = 1.7k FtLb
GPM = 600 @ 500 psi
P/U 55k SIO 51 k ROT 53k
Run gyro survey every stand drilled.
ART = 0.25 hrs
SPUD @ 21 :30
3/18/2004 00:00 - 02:30 2.50 DRILL P SURF Drill 13-1/2" surface hole from 170' to 447'. Sliding 100% to
build angle
WOB = 2-20 klbs
GPM = 600 - 1006 psi on Btm, 765 psi off Btm
P/U 69k SIO 64k
Run gyro surveys at 170', 196' and 447'
02:30 - 03:30 1.00 DRILL P SURF Stand back 3 stands to PU Jar stand. RIH to 447'
03:30 - 14:00 10.50 DRILL P SURF Drill 13-1/2" surface hole from 447' to 1570'. Sliding as required
to build angle and maintain azimuth.
WOB = 30-35klbs
RPM = 80
Printed: 51312004 8:46:01 AM
page 2 of 34
BPEXPLORATION
Oþeration~..·...$urnm·~ r.Y:.B.~port
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Task Code NPT Phase
3/18/2004 03:30 - 14:00 10.50 DRILL P SURF
14:00 - 14:30 0.50 DRILL P SURF
14:30 - 16:30 2.00 DRILL P SURF
16:30 - 17:00 0.50 DRILL P SURF
17:00 - 18:30 1.50 DRILL P SURF
18:30 - 00:00 5.50 DRILL P SURF
3/19/2004
4.00 DRILL P
SURF
00:00 - 04:00
04:00 - 05:00
1.00 DRILL P
SURF
05:00 - 08:00
3.00 DRILL P
SURF
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description..·.of··Opera.tions
Torque off Btm = 2.3k FtLb, Torque on Btm = 7-9k FtLb
GPM = 750 @ 2050 psi on Btm, 1570 psi off Btm
P/U 87k SIO 80k ROT 82k
Circulate BU volume X 2
Monitor well - static. POH for new bit. started pulling over at
1100', pumped out to 950'. Stand back BHA and drop off
UBHO sub.
PU new HTC 13-1/2" MX-C1. Clean rig floor.
RIH to 1478'. MU top drive and wash last stand to bottom at
1570'.
Drill 13-1/2" surface hole from 1570' to 2360'. Sliding as
required to build angle and maintain azimuth.
WOB = 30-35klbs
RPM = 80
Torque off Btm = 5k FtLb, Torque on Btm = 8-1 Ok FtLb
GPM = 750 @ 2200 psi on Btm, 1820 psi off Btm
P/U 100k SIO 84k ROT 90k
P/U 104k SIO 89k No Pumps
Backream each stand at drilling rate.
Intermittent gas hydrates from 1900' to 2360'
AST = 8.66 hrs.
ART = 3.49 hrs.
Formation tops:
SV4 - 1829' MD
Base of Permafrost - 1892' MD
SV3 - 2306' MD
SV2 - 2547' MD
Drill 13-1/2" surface hole from 2360' to 3210'. Sliding as
required to build angle and maintain azimuth.
WOB = 35klbs
RPM = 80
Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb
GPM = 750 @ 2200 psi on Btm, 1990 psi off Btm
P/U 114k SIO 88k ROT 100k
Backream each stand at drilling rate.
Intermittent gas hydrates.
AST = 1.95 hrs.
ART = 0.84 hrs
Top of the SV1 @ 3050' MD
Circulate BU volume X 2. 770 gpm @ 2060 psi, reciprocate DP
at 100 rpm.
Monitor well - static. POH on short trip to HWDP. Overpulls to
25 klbs at 2050', 1850-1800', 1450'. Work each spot & clean
Printed: 5/312004 8:46:01 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To Hours Task Code. NPT Phase, Description of ,Operations
3/19/2004 05:00 - 08:00 3.00 DRILL P SURF up - OK.
Tight spot at 1400' - swabbing. Kelly up & circ @ 300 gpm/350
psi. Work up thru tight spot and precautionary circ up to 900' w/
minor pulls. Continue POH to HWDP.
08:00 - 09:30 1.50 DRILL P SURF RIH to bottom. Wipe minor tight spots at 1090' and
1300'-1500'.
09:30 - 12:00 2.50 DRILL P SURF Circ last stand to bottom and cond mud for casing & cement-
stage up to 770 gpm @ 2320 psi and 120 rpm. Reduce MW to
9.6 ppg & FV to 225.
12:00 - 14:30 2.50 DRILL P SURF Monitor well - static. POH to run csg. Tight spot at 2032' -
swabbing. MU top drive and circ @ 300 gpm/325 psi. Pump out
to 2140'. POH to 1325', tight spot - swabbing. Work thru. POH
with no more problems to HWDP.
14:30 - 15:30 1.00 DRILL P SURF Monitor well at HWDP - static. Stand back HWDP, Jars and
DC's
15:30 - 16:30 1.00 DRILL P SURF LD BHA #2
16:30 - 17:00 0.50 DRILL P SURF Clean and clear rig floor.
17:00 - 17:30 0.50 CASE P SURF MU landing joint and make dummy run.
17:30 - 19:30 2.00 CASE P SURF RU csg equipment
19:30 - 20:00 0.50 CASE P SURF PJSM with MI, Nabors Casing and all rig personnel on running
10-3/4· surface casing.
20:00 ~ 00:00 4.00 CASE P SURF MU shoe track and test float equipment. Run 76 jts 10-3/4·,
45.5#, L-80, BTC surface casing. Taking weight at 11 DO' work
through to 1200'. Break circulation on jt #40. Taking weight
again from 1920' to 2500' then clear to bottom.
25 bow spring centralizers on the collars of jts #1 and #3 thru
#26
Midnight depth - 2582'
3/20/2004 00:00 - 01 :00 1.00 CASE P SURF Continue running 10-3/4",45.5# surface casing.
01 :00 - 01 :30 0.50 CASE P SURF MU landing joint and land casing with shoe at 3197'.
01 :30 - 02:00 0.50 CEMT P SURF RD fill-up tool and blow down top drive. RU cement head.
02:00 - 04:00 2.00 CEMT P SURF Circulate and condition hole for cement. Stage pumps to 10
bpm @ 760 psi. Reciprocate csg 5-10', P/U 152k Ibs S/O 96k
Ibs. No losses.
04:00 - 04:30 0.50 CEMT P SURF PJSM with DS, NAD, MI, Veco, BP prior to starting cement job.
04:30 - 05:20 0.83 CEMT P SURF Air up & prime up cementers. Mix & pump 5 bbls CW100
preflush. Test lines to 3500 psi. Pump remaining 15 bbls
CW100.
05:20 - 05:40 0.33 CEMT P SURF Mix & pump 70 bbls Mudpush II spacer at 10.2 ppg.
05:40 - 06:40 1.00 CEMT P SURF Release bottom plug. Mix & pump 480 bbls (605 sx) ArcticSet
lite slurry at 10.7 ppg - 8.5 bpm @ 390 psi.
06:40 - 07:00 0.33 CEMT P SURF Switch to tail. Mix & pump 74 bbls (355 sx) Class G slurry at
15.8 ppg - 5 bpm @ 350 psi.
07:00 - 07:30 0.50 CEMT P SURF Release top plug and kick out with 10 bbls water from
cementers to clear lines. Switch to rig pumps and displace with
mud at 12 bpm @ 800 psi.
Getting good cement returns to surface 2000 strokes into
displacement.
Reciprocated pipe while pumping cement and 205 bbls into
displacement - then landed on ring for remainder of job.
Slow to 3 bpm for last 15 bbls displacement. Bump plug with
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Operatiºns S.uOlroªryReport,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Date From-To Hours Task Code NPT Phase
3/20/2004 07:00 - 07:30 0.50 CEMT P SURF
07:30 - 08:00 0.50 CEMT P SURF
08:00 - 14:00 6.00 DIVRTR P SURF
14:00 - 20:30 6.50 BOPSUP P SURF
20:30 - 21 :00 0.50 BOPSUP P SURF
21 :00 - 00:00 3.00 BOPSUF P SURF
3/21/2004 00:00 - 00:30 0.50 BOPSUP P SURF
00:30 - 01 :00 0.50 BOPSUF P SURF
01 :00 - 03:30 2.50 DRILL P INT1
03:30 - 05:00 1.50 DRILL P INT1
05:00 - 06:00 1.00 CASE P SURF
06:00 - 07:30 1.50 DRILL P INT1
07:30 - 09:00 1.50 DRf LL P INT1
09:00 - 10:00
1.00 DRILL P
INT1
10:00 - 11 :00
1.00 DRILL P
INT1
11 :00 - 12:30
1.50 DRILL P
INT1
12:30 - 13:00
0.50 DRILL N
FLUD INT1
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
DeSGFiptionØ~rØp~rati()ns
1500 psi at 299.6 bbls total displacement. Bleed off pressure -
floats holding.
Full returns throughout pumping and displacing cement. Got
back 125 bbls good lead slurry. CIP at 07:30 hrs on 3/20/04.
Flush flow line and stack. Blow down and RD cement lines. RD
cement head. Break out and LD landing joint.
ND diverter, riser and Hydril. Move diverter line out of cellar.
NU speed head, tbg spool and BOP.
15:30 hrs - take on new 9.2# LSND mud
PJSM with all rig personnel on testing BOPE
Test BOPE to 250/3500 psi. Test annular to 250/3500 psi.
Witness of BOP test waived by Jeff Jones with AOGCC.
Continue testing BOPE 250/3500 psi
Pull test plug and install wear bushing. RD test equipment.
PU BHA #3,9-7/8" directional drilling assembly. Shallow test
MWD.
RIH to 2834'
Test 10-3/4" 45.5# casing to 3500 psi for 30 minutes.
Cut and slip 52' of drilling line. Service top drive.
Wash down from 2834', tag float collar at 3110'. Drill shoe track
and rat hole to 3210', continue drilling 20' of new hole to 3230'
RPM = 50
Torque = 7k FtLb
GPM = 580 @ 1360 psi
ROT 97k
Displace well to new 9.1 ppg LSND mud.
RPM = 50
GPM = 50 @ 1300 psi
ROT 97k
Perform LOT, EMW = 13.3 ppg. 575 psi surface pressure with
9.1 ppg mud at 2642' TVD. Calculated kick tolerance 149 bbls
Establish baseline ECD = 9.67 ppg
Drill 9-7/8" intermediate hole from 3230' to 3496', rotating 100%
WOB = 20 klbs
RPM = 80
Torque off Btm = 4.6k FtLb, Torque on Btm = 6-7k FtLb
GPM = 600 @ 1520 psi on Btm, 1190 psi off Btm
P/U 115k S/O 85k ROT 98k
Backream every stand at 600 gpm and 80 rpm, reducing flow
rate to 420 gpm on down stroke.
Calculated ECD = 9.66 ppg, Actual ECD = 10.30 ppg
POH 3 stands to shoe.
Skakers blinding off apparently due to oil wetting of bentonite in
new LSND mud. Blinding off of shakers required pump rate
reductions, unable to drill ahead.
Printed: 5/312004 8:46:01 AM
"
)
.' ,. - -,-,
e.R,gXPLORATIQN:
"O:p' ···.~ratiønssumrnåry.···Repo........r.t.'...........
': , '., ", :';, :,' ',:',:....-:'::. ': /'.: :' .":. .-', ,,:,,:: ,',.. '.,..:: ",; '. ",' '.:.,: :,' ,~'t,d';':::'''' '. ': ",..; :':: .-:':-' . ,:':' '~
¡,":'
.,',"",
t,,',
:" ';"'~:':",,'... '. ".~" ;
..
"
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To . Hours Task Code NPT Phase Description of Operë;itions
3/21/2004 13:00 - 17:00 4.00 DRill N FLUD INT1 Circulate and condition mud at 50 gpm.
Screened down shakers and circulated until the blinding
problem was eliminated. Able to screen back up and circulate
at drilling rate
17:00 - 17:30 0.50 DRILL N FLUD INT1 RIH to 3400', wash to bottom at 3496'
17:30 - 18:30 1.00 DRILL P INT1 Stage up pumps and drill from 3496' to 3683'.
WOB = 15 klbs
RPM = 80
Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb
GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm
P/U 117k S/O 90k ROT 105k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg
18:30 - 19:30 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure on the top drive lube pumps.
Change out filter, regained oil pressure.
19:30 - 20:30 1.00 DRILL N RREP INT1 RIH to 3589', wash to bottom at 3683'
20:30 ~ 21 :00 0.50 DRILL N INT1 Stage up pumps and drill from 3683' to 3776'.
WOB = 15 klbs
RPM = 80
Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb
GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm
P/U 117k S/O 90k ROT 105k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg
AST = 0.23 hrs.
ART = 1.08 hrs.
21:00 - 22:00 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure in the top drive lube pump
again.
22:00 - 00:00 2.00 DRILL N RREP INT1 Change out top drive lube pump.
3/22/2004 00:00 - 01 :00 1.00 DRILL N RREP INT1 Continue change out top drive lube pump.
01 :00 - 01 :30 0.50 DRILL N RREP INT1 RIH to 3686', wash last stand to bottom at 3776'
01 :30 - 00:00 22.50 DRILL P INT1 Stage up pumps and drill from 3776' to 5844'. Sliding as
required to maintain inclination and azimuth.
WOB = 15 klbs
RPM = 80
Torque off Btm = 6-7k FtLb, Torque on Btm = 8-16k FtLb
GPM = 650 @ 2060 psi on Btm, 1735 psi off Btm
P/U 148k SIO 110k ROT 130k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Printed: 51312004 8:46:01 AM
Page 6 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Däte
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
DesQriptionof()per~itions
3/22/2004
01 :30 - 00:00
From..ToHours Task Coqe NPT Phase
INT1
Calculated ECD = 9.87 ppg, Actual ECD = 10.00 ppg
3/23/2004
00:00 - 17:00
17:00 - 19:00
19:00 - 20:00
20:00 - 21 :30
21 :30 - 00:00
3/24/2004
00:00 - 00:30
00:30 - 01 :00
22.50 DRILL P
17.00 DRILL P
2.00 DRILL P
1.00 DRILL P
1.50 DRILL P
2.50 DRILL P
0.50 DRILL P
0.50 DRILL P
AST = 5.89 hrs.
ART = 3.89 hrs.
INT1
Formation tops:
UG1 4775' MD, 3674' TVD
Ma 5300' MD, 4020' TVD
Directional drill from 5844' to 7055'. Sliding as required to
maintain inclination and azimuth.
WOB = 20-25 klbs
RPM = 80
Torque off Btm = 7 -8k FtLb, Torque on Btm = 8-1 Ok FtLb
GPM = 650 @ 2230 psi on Btm, 1993 psi off Btm
P/U 147k S/O 106k ROT 125k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Calculated ECD = 10.02 ppg, Actual ECD = 10.37 ppg
AST = 1.88 hrs.
ART = 9.32 hrs.
INT1
Formation Tops:
OA 6048' MD 4441' TVD
OBa 6227' MD 4513' TVD
OBb 6372' MD 4560' TVD
OBd 6996' MD 4664' TVD
Circulate BU vol X 2,670 gpm @ 2106 psi, reciprocate DP at
120 rpm.
INT1
Calculated ECD = 10.02
Initial ECD = 10.42
ECD prior to POH = 10.19
Monitor well - static. POH 15 stands to 5751', no problems
INT1
P/U 155k SIO 105k no pumps
Pump dry job and continue POH. Attempting to swab at 3451',
RIH to 3655'
Stage up pumps and begin backreaming from 3655'. Backream
out to 3451, attempting to pack off. RIH 1 stand to 3544'.
Attempt to backream, still packing off. RIH another stand to
3683', bring pumps up to 600 gpm watching for ECD spikes.
Able to circulate no problem, start backreaming out from 3683'
INT1
600 gpm @ 1247 psi and 85 rpm
INT1
Midnight depth 3582'
Continue backreaming out from 3582' to csg shoe at 3197'.600
gpm @ 1250 psi and 90 rpm
Pump hi-vis sweep around at csg shoe. 600 gpm @ 1200 psi
INn
Printed: 5/3J2oo4 8:46:01 AM
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date' From - To Hours Task Code NPT Phase Description of Operations,
3/24/2004 00:30 - 01 :00 0.50 DRILL P INT1 and 80 rpm
Calculated ECD = 9.86
Actual ECD = 9.94
01 :00 - 01 :30 0.50 DRILL P INT1 Service top drive
01 :30 - 03:30 2.00 DRILL P INT1 RIH to 7055, wash last stand down. No problems on RIH.
P/U 115k S/O 90k
03:30 - 05:30 2.00 DRILL P INT1 Stage up pumps and circulate BU volume X 3. Circulate lo-hi
vis sweep surface to surface. 670 gpm @ 200 psi and 120 rpm.
P/U 147k S/O 106k ROT 125k
Torque = 10k FtLb
Calculated ECD = 9.93
ECD prior to POH = 10.03
05:30 - 06:30 1.00 DRILL P INT1 MOnitor well- static. POH 10 stands to 6125'.
P/U 165k S/O 100k
06:30 - 11 :00 4.50 DRI LL P INT1 Slug DP and continue POH laying down 5" DP.
11 :00: 12:00 1.00 DRILL P INT1 RIH with 11 stands 5" DP from derrick
12:00 - 12:30 0.50 DRILL P INT1 Continue LDDP
12:30 - 15:00 2.50 DRILL P INT1 PJSM with Anadrill and all rig personnel on removing RA
source and laying down BHA. LD BHA #3, remove source from
ADN.
15:00 - 15:30 0.50 DRILL P INT1 Clean and clear rig floor.
15:30 - 16:30 1.00 BOPSUP P INT1 Flush stack and pull wear bushing.
16:30 - 18:00 1.50 BOPSUPP INT1 Change top rams to 7-5/8". Install test plug and test door seals
to 3500 psi.
18:00 - 20:00 2.00 CASE P INT1 MU landing joint and make dummy run. RU 7-5/8" csg
equipment.
20:00 - 20:30 0.50 CASE P INT1 PJSM with Nabors Casing, MI and all rig personnel on running
7-5/8" csg.
20:30 - 00:00 3.50 CASE P INT1 MU and test float equipment. RUN 7-5/8", 29.7#, L-80, BTC-M
intermediate csg as per running orders.
Midnight depth 1696'
3/25/2004 00:00 - 01 :30 1.50 CASE P INT1 Continue Run 7-5/8",29.7#, L-80 csg from 1696' to 3197' at 1
minute per jt. Break circulation every 20 jts.
01 :30 - 02:00 0.50 CASE P INT1 Circulate 1.5 X csg vol at the 10-3/4" csg shoe. 7 bpm @ 350
psi. P/U 120k S/O 100k no pumps
02:00 - 12:00 10.00 CASE P INT1 Continue running 7-5/8" csg into open hole. 1 minutefJt above
5000', 1.5 minutefJt below 5000'. Fill every jt, break circulation
every 5 jts, circulate for 15 minutes every 15 jts. and CBU
every 30 jts. Good displacement, no losses while running csg.
12:00 - 12:30 0.50 CEMT P INT1 RD fill-up tool. RU cement head.
12:30 - 14:00 1.50 CEMT P INT1 Stage up pumps and circulate and condition hole. Max rate 7
bpm @ 502 psi Reciprocate DP. P/U 225k S/O 110k
14:00 - 14:30 0.50 CEMT P INT1 PJSM with Schlumberger, MI and all rig personnel on
cementing 7-5/8" csg.
14:30 - 17:00 2.50 CEMT P INT1 Air up and batch up cementers. Pump 5 bbl CW-1oo. Test
lines to 3500 psi, pump remaining 20 bbls CW-1oo. Pump 45
Printed: 5/312004 8:46:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
, Pél9ë8of34
BP EXPLOBATION
Op~rati9ns $u I11lT1ðryReport
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
3/25/2004
14:30 - 17:00
From'"" To Hours Task Code
17:00 - 18:00
3/26/2004
18:00 - 19:30
19:30 - 20:00
20:00 - 22:00
22:00 - 00:00
00:00 - 13:00
13:00 - 14:00
14:00 - 15:00
2.50 CEMT P
INT1
1.00 CEMT P
INT1
1.50 CASE P
0.50 WHSUR P
2.00 CEMT P
2.00 CEMT P
13.00 CEMT P
INT1
INT1
INT1
INT1
INT1
1.00 BOPSUF P
1.00 WHSUR P
INT1
INT1
15:00 - 19:30 4.50 BOPSURP INT1
19:30 - 20:30 1.00 BOPSUF P INT1
20:30 - 22:00 1.50 BOPSUF P INT1
22:00 - 00:00 2.00 DRILL P PROD1
3/27/2004 00:00 - 01 :00 1.00 DRILL P PROD1
01 :00 - 04:30 3.50 DRILL P PROD1
04:30 - 05:00 0.50 DRILL P PROD1
05:00 - 07:30 2.50 DRILL P PROD1
07:30 - 09:00 1.50 CASE P INT1
09:00 - 11 :30 2.50 DRILL N WAIT PROD1
11 :30 - 13:00
13:00 - 14:00
bbls 10.5 ppg Mud push. Drop bottom plug and pump 126 bbl
(589 sxs) 15.8 ppg Class-G cement. Drop top plug and kick out
with 10bbls water from cementers to wash up lines.
Switch to rig pumps and displace with seawater at 7 bpm, ICP
= 117 psi. Slow rate to 3 bpm to bring mud push around the
shoe then increase rate back to 7 bpm. Able to reciprocate
casing throughout cement job, land csg 290 bbls into
displacement. Slow rate to 3 bpm for the last 20 bbls of
displacement, FCP = 750 psi. Bump plugs with 1000 psi on
calculated strokes, floats holding. CIP 17:45
RD cement head. LD landing joint and RD csg equipment.
RILDS on packoff. Test packoff to 5000 psi.
change top drive quill to 4" HT-40, change out bails.
Clean mud and cement out from under rotary table.
PJSM with all rig personnel. Install wear bushing. PU 4" DP,
stand stands back in derrick. RU and inject 130 bbls 9.3 ppg
mud down the 10-3/4" X 7-5/8" annulus. Lot EMW = 13.5 ppg,
580 psi surface pressure and a shoe TVD of 2642'.
3bpm
ICP = 620 psi
FCP = 550 psi
SIP = 400 psi
Change top rams to 3-1/2" X 6" variables
RU Little Red, Test lines to 3500 psi. Inject 91 bbls dead crude
down 10-3/4" X 7-5/8" annulus.
ISP = 625 psi
FCP = 890 psi
SIP = 672 psi
RU and test BOPE 250/3500 psi. Witness of BOP test waived
by Chuck Sheave with AOGCC.
Pull test plug. RD test equipment. Install wear bushing.
PJSM with all rig personnel. Cut and slip 91' of drill line.
Service top drive, blocks and crown.
PU and MU BHA #4,6-3/4" directional assembly.
Continue PU and MU BHA #4
RIH, picking up single joints of DP, to 4000'.
Function test MWD.
Continue RIH, picking up single joints of DP to 6892'. Wash
down and tag cmt at 6933'.
RU and test 7-5/8" csg to 3500 psi for 30 minutes.
Waiting on trucks for MOBM displacement.
Pull 9 stands of DP, Move 4" HT -40 HWDPin derrick to access
4" HT-38 HWDP. RIH with 4" HT-38 HWDP, POH Laying
down. RIH with 4" HT-40 HWDP.
PROD1 Pump 40 bbl MOBm spacer. Displace well to 9.2 ppg MOBM.
286 gpm @ 2500 psi.
PROD1 Drill shoe track, rathole and 20' of new hole to 7075'.
1.50 DRILL P
1.00 DRILL P
Torque off Btm = 3k FtLb, Torque on Btm = 4k FtLb
GPM =286 @ 2620 psi on Btm, 2500 psi off Btm
Printed: 5/312004 8:46:01 AM
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
NPT Phase
Description of Operations.,
3/27/2004
13:00 - 14:00
14:00 - 14:30
1.00 DRILL P
0.50 DRILL P
14:30 - 15:30
1.00 DRILL P
PROD1
PROD1 CBU
286 gpm @ 2500 psi
PROD1 Perform 12.0 ppg EMW FIT. 680 psi, 9.2 ppg MOBM, 4673'
TVD.
15:30 - 18:00
2.50 DRILL P
Establish baseline ECD's
ECD = 10.23
PROD1 Directional drill from 7075' to 7358', sliding as required to build
angle and azimuth.
18:00 - 18:30
0.50 STKOH C
WOB = 5-15 klbs
RPM = 60
GPM = 280 @ 2900 psi on Btm, 2680 psi off Btm
PROD1 POH from 7358' to 7130' for geologic plug back.
18:30 - 21 :00
2.50 STKOH C
Well landed for horizontal section 6' TVD high to plan.
Estimated formation dip in prognosis -2 degrees, actual
formation dip <1 degree. The combination of these would have
resulted in the loss of the entire lower OBd sand. Town
engineering and geology staff were consulted and the decision
was made to open hole sidetrack at 7130'.
PROD1 Trench for sidetrack at 150 degrees right. Trench and drill from
7130' to 7358'.
PROD1 Directional drill from 7358' to 7555', sliding as required to build
angle and azimuth.
21 :00 - 00:00
3.00 DRILL P
WOB = 5-15 klbs
RPM = 65
Torque off Btm = 4.4k FtLb, Torque on Btm = 5.5k FtLb
GPM = 280 @ 2750 psi on Btm, 2430 psi off Btm
P/U 135k S/O 82k ROT 104k
P/U 135k S/O 90k No pumps
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.22 ppg, Actual ECD = 10.77 ppg
3/28/2004
00:00 - 11:00
11.00 DRILL P
AST = 1.63 hrs.
ART = 1.57 hrs.
PROD1 Directional drill from 7555' to 8280', sliding as required to
maintain angle and azimuth.
WOB = 8-15 klbs
RPM = 65
Torque off Btm = 5.4k FtLb, Torque on Btm = 6.5k FtLb
GPM = 280 @ 3100 psi on Btm, 2564 psi off Btm
P/U 134k S/O 83k ROT 108k
P/U 143k S/O 92k No pumps
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke.
Printed: 51312004 8:46:01 AM
BP EXPLORATION
··P.peratiolls s (JrtÚli~ryReport
Page 10 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From.,.Tö Hours Task Code NPT Phase Description of Operations
3/28/2004 00:00 - 11 :00 11.00 DRILL P PROD1
Calculated ECD = 10.55 ppg, Actual ECD = 11.13 ppg
11 :00 - 11 :30 0.50 DRILL P PROD1 Service #2 mud pump, loose cable on traction motor
11 :30 - 14:30 3.00 DRILL P PROD1 Directional drill from 8280' to 9093', sliding as required to
maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque oft Btm = 5.9k FtLb, Torque on Btm = 7k FtLb
GPM = 280 @ 2950 psi on Btm, 2510 psi off Btm
P/U 141k S/O 79k ROT 107k
P/U 150k S/O 88k No pumps
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.61 ppg, Actual ECD = 10.90 ppg
14:30 - 15:30 1.00 DRILL P PROD1 Circulate and condition while correlating geologic data.
280 gpm @ 2510 psi and 70 rpm
15:30 - 21 :30 6.00 DRILL P PROD1 Directional drill from 9093' to 9870', sliding as required to
maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque off Btm = 6.5k FtLb, Torque on Btm = 7.7k FtLb
GPM = 280 @ 3150 psi on Btm, 2614 psi off Btm
P/U 148k S/O 69k ROT 107k
P/U 157k S/O 80k No pumps
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.66 ppg, Actual ECD = 11.24 ppg
AST = 3.03 hrs.
ART = 4.92 hrs.
21 :30 - 00:00 2.50 DRILL P PROD1 Condition hole for wiper trip to 7-5/8" csg shoe. Circulate BU
volume X 2. Pump 10 bbl base oil sweep surface to surface.
Circulate until ECD within 0.3 ppg of calculated.
296 gpm @ 2830 psi and 70 rpm
Calculated ECD = 10.37
ECD prior to wiper trip = 10.56
3/29/2004 00:00 - 01 :30 1.50 DRILL P PROD1 Monitor well - static. POH on wiper trip to 7-5/8" csg shoe. No
problems
01 :30 - 17:00 15.50 DRILL N RREP PROD1 PJSM with all rig personnel. Change out top drive wash pipe
and upper rotary seals.
17:00 - 17:30 0.50 DRILL P PROD 1 Service top drive and blocks
17:30 - 19:30 2.00 DRILL P PROD1 RIH, work through tight spots at 8575' and 9230'. Wash last
stand to bottom at 9870'
19:30 - 20:00 0.50 DRILL P PROD1 Stage pumps to drilling rate, 280 gpm @ , and CBU
Printed: 5/312004 8:46:01 AM
)
)
BP EXPLORATION
Op,erations SUI1.1.m.,·'ary,FJeport
, ' .
Page 11 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To, Hours . Task Code NPT Phase Description of Operations '
3/2912004 20:00 - 00:00 4.00 DRILL P PROD1 Directional drill from 9870' to 10057', sliding as required to
maintain angle and azimuth.
WOS = 8-12 klbs
RPM = 70
Torque off Stm = 6.6k FtLb, Torque on Stm = 7.5k FtLb
GPM = 280 @ 3160 psi on Stm, 2660 psi off Stm
P/U 146k 8/0 80k ROT 107k
P/U 156k SIO 84k No pumps
Sackream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.49 ppg, Actual ECD = 11.04 ppg
A8T = 0.56 hrs.
ART = 0.34 hrs.
3/30/2004 00:00 - 10:00 10.00 DRILL P PROD1 Drill 6-3/4" directional hole from 10057' to 11364', sliding as
required to maintain angle and azimuth.
WOS = 10-12 klbs
RPM = 75
Torque off Stm = 7.9k FtLb, Torque on Stm = 9.0k FtLb
GPM = 280 @ 3600 psi on Stm with 500 psi differential
pressure
P/U 154k SIO 62k ROT 100k
Sackream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.72 ppg Actual ECD = 11.7 ppg
10:00 - 10:30 0.50 DRILL P PROD1 Circulate to reduce ECD. Riciprocate & rotate (75 rpm) drill
string wihile circulating with 280 gpm @ 3050 psi.
ECD after Circulating = 11.32 ppg
10:30 - 12:30 2.00 DRILL P PROD1 Drill 6-3/4" directional hole from 11364' to 11642', sliding as
required to maintain angle and azimuth.
was = 10-12 klbs
RPM = 75
Torque off Stm = 7.9k FtLb, Torque on Stm = 9.0k FtLb
GPM = 280 @ 3600 psi on Stm with 500 psi differential
pressure
P/U 154k S/O 62k ROT 100k
Sackream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.72 ppg Actual ECD = 11.82 ppg
12:30 - 14:00 1.50 DRILL P PROD1 Circulate @ 11642' while evaluating geological well data.
14:00 - 16:00 2.00 DRILL P PROD1 Drill 6-314" directional hole from 11642' to 11831 I, sliding as
required to maintain angle and azimuth.
was = 10-12 klbs
Printed: 5/312004 8:46:01 AM
BP EXPLORATION
Operations SurnmaryR~p()rt
Drilling Time last 24 Hrs= 5.68 hrs
ART = 3.12 Hrs AST = 2.56 Hrs. Survey & Connection time =
8.82 Hrs
DFAL PROD1 Circulate while trouble shooting problem with MWD-GR tool.
Backream up one stand to correlate MWD data. Gamma
Counts prior to having problem was reading 80 CPS. Currently
reading 10 CPS. Unable to rectify MWD-GR tool problem.
Failure unknown at this time.
Circulated 2 x bottoms-up from 11856' @ 280 gpm with 2880
psi.
Calculated ECD =10.85 ppg Actual ECD after circulating =
11.06 ppg
DFAL PROD1 POOH (Due to MWD tool failure) to 7-5/8" casing shoe with no
problems. Hole in good condition. Flow check @ shoe. Well
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Date From - To Hours .'-a~* Code NPT Phase
3/30/2004 14:00 - 16:00 2.00 DRILL P PROD1
16:00 - 19:00
3.00 DRILL P
PROD1
19:00 - 20:00 1.00 DRILL P PROD1
20:00 - 21 :30 1.50 DRILL P PROD1
21 :30 - 22:00 0.50 DRILL P PROD1
22:00 - 00:00
2.00 DRILL N
3/31/2004
00:00 - 02:30
2.50 DRILL N
Page 12 of34
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
D~êçripti()nof<J:}pøtct!ip [1S
RPM = 75
Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3290 psi on Btm with 280 psi differential
pressure
P/U 151k S/O 60k ROT 104k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg
Circulate & condition mud/hole for wiper trip. Circulate until
ECD within 0.3 ppg of calculated.
280 gpm @ 2890 psi and 75 rpm
Calculated ECD = 10.78 ppg
ECD prior to wiper trip = 11.08
POOH for wiper trip from 11831' to 9590' (24 Stds) with no
problems. Hole in good condition. Max drag 15k.
TIH to 11736' with no problems. M/U TDS. Establish
circulation. Precautionary wash & ream to bottom with no
problems. No fill on bottom.
Drill 6-3/4· directional hole from 11831' to 11856', sliding as
required to maintain angle and azimuth. Had a fair amount of
drill cuttings come over shakers on bottoms up from wiper trip.
Note: Gamma-Ray tool generating incorrect data.
WOB = 10-12 klbs
RPM = 75
Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3290 psi on Btm with 280 psi differential
pressure
P/U 151k S/O 60k ROT 104k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg
Printed: 5/312004 8:46:01 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
" Date From - To ' Hours Task Code, ,NPT Phase, Description of Operations, '
3/31/2004 00:00 - 02:30 2.50 DRilL N DFAL PROD1 static.
02:30 - 05:00 2.50 DRILL N DFAL PROD1 Continue POOH with drill string to top of BHA.
05:00 - 05:15 0.25 DRILL N DFAL PROD1 SAFETY--- Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
05:15 - 07:00 1.75 DRILL N DFAL PROD1 Stand back Jars & NMDC's. Unload RA Source from lWD. UD
MWD-LWD tool. Check mud-motor & bit (Bit in like new
condition). Down-load MWD.
07:00 - 07:30 0.50 DRILL N DFAL PROD1 Clean Rig Floor.
07:30 - 07:45 0.25 DRILL N DFAL PROD1 SAFETY --- Held PJSM with Anadrill and all Rig personnel
regarding picking up BHA & loading RA source.
07:45 - 09:30 1.75 DRILL N DFAL PROD1 M/U 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK.
09:30 -12:00 2.50 DRILL N DFAL PROD1 TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7032'.
12:00 - 13:00 1.00 DRILL N DFAL PROD1 Service TDS. Slip & cut 78' of Drill Line. Reset & check C-O-M.
Check brake system.
13:00 - 15:00 2.00 DRILL N DFAL PROD1 Continue TIH to 11600' with no problems.
15:00 - 16:00 1.00 DRILL N DFAL PROD1 MIU TDS. Establish circulation. Stage pumps to 280 gpm with
2520 psi + 70 rpm. Perform MADD PASS from 11600'-11856'.
16:00 - 21 :00 5.00 DRILL P PROD1 Drill 6-3/4" directional hole from 11856' to 12327', sliding as
required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 75
Torque off Btm = 8.0k FtLb, Torque on Btm = 10k FtLb
GPM = 280 @ 3480 psi on Btm with 200 psi differential
pressure
P/U 155k S/O 59k ROT 103k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 10.90 ppg Actual ECD = 11.39 ppg
Drilling Time last 24 Hrs= 2.15 hrs
ART = 1.08 Hrs AST = 1.07 Hrs. Survey & Connection time =
2.85 Hrs
21 :00 - 23:30 2.50 DRILL C PROD1 Circulate @ 12327' while evaluating geological well data.
Note: Due to a unaccceptable amount of pay zone drilled, a
decision was made by the BP Drilling department to perform a
Open Hole sidetrack at 10585' MD. Circulate hole clean (2 x
Btm-up vol) with 280 gpm @ 2870 psi. Reciprocate & rotate
drill string (75 RPM) while circulating.
ECD after circulating: Calculated ECD = 10.90 Actual ECD =
11.20.
P/U 155k SIO 59k Rot Wt 1 03k
23:30 - 00:00 0.50 DRILL C PROD1 Flow check. Well static. Blow down TDS. POOH for Open-hole
Sidetrack from 12327' to 11453'-midnight depth. Hole in good
shape. Max drag 15k.
4/1/2004 00:00 - 00:30 0.50 DRILL C PROD1 POOH from 11453' to 10565' for Open-hole Sidetrack. Hole in
good shape. Max drag 15k.
00:30 - 01 :30 1.00 STKOH C PROD1 Break circulation. Stage pumps to 280 gpm wi 2730 psi. Orient
TF to 140 deg LHS for Open Hole Sidetrack. Start trenching
from 10565' to 10585'. NOTE: AIM tool quit working.
01:30 - 02:30 1.00 STKOH X DFAL PROD1 Circulate & work drill string @ 10585' while trouble shooting
problem with AIM Tool. Unable to rectify problem.
Printed: 5/312004 8:46:01 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
l-201
l-201
DRlll+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
FrQm"To . HoUrs :T:J(a.$k Cöde:NPT Phase
4/1/2004 02:30 - 04:00 1.50 STKOH X DFAL PROD1
04:00 - 06:30 2.50 STKOH X DFAL PROD1
06:30 - 06:45 0.25 STKOH X DFAL PROD1
06:45 - 09:00 2.25 STKOH X DFAL PROD1
09:00 - 14:00 5.00 BOPSUF X DFAL PROD1
14:00 - 14:15 0.25 STKOH X DFAL PROD1
14:15 - 15:30 1.25 STKOH X DFAL PROD1
15:30 - 18:00 2.50 STKOH X DFAL PROD1
18:00 - 19:30 1.50 STKOH X DFAL PROD1
19:30 - 21 :00 1.50 STKOH X DFAL PROD1
21 :00 - 21 :30 0.50 STKOH X DFAL PROD1
21 :30 - 00:00 2.50 DRILL C PROD1
4/2/2004
00:00 - 14:25
14.42 STKOH C
PROD1
Page 140f 34
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Descri ptio flc>f()pe r(itioDs
POOH from 10585' to 7-5/8" Casing Shoe @ 7047' with no
problems. Hole in good condition. Flow check @ shoe. Well
static.
Continue POOH from 7047' to top of BHA.
SAFETY --- Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
Stand back Jars & NMDC's. Remove RA Source. UD
MWD-LWD tool, mud-motor & bit (Bit in good condition).
Held PJSM. Pull wear bushing. Run BOP Test Plug on 4" DP.
Rig Up Testing Equipment - Test BOP & Related Surface
Equipment: Test Annular, Upper And Lower Pipe Rams, Blind
Rams, Manual & HCR Valves on C/K Lines, Choke Manifold,
TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP
Valves At 250 Psi. Low And 3,500 Psi. High. Perform
Accumulator Test. Blow down lines. Rig Down testing
Equipment
The BOP Test witnessed By AOGCC Inspector John Crisp.
SAFETY--- Held PJSM with Anadrill and all Rig personnel
regarding picking up BHA & loading RA source.
M/U 6-3/4" Steerable Drilling assembly (BHA #6). Shallow test
MWD-OK.
TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7-5/8"
Casing Shoe @ 7047'.
Service TDS. Slip & cut 37' of Drill Line. Reset & check C-O-M.
Check brake system.
Continue TIH to 10522' with no problems.
M/U TDS. Establish circulation. Stage pumps to 280 gpm with
2820 psi. Wash down to 10565'. Orient TF to 140 deg LHS for
Open Hole Sidetrack 02. Trench from 10565' to 10585'.
Sidetrack well & Drill 6-3/4" directional hole from 10585' to
10615', sliding as required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb
GPM = 280 @ 2820 psi on Btm with 100 psi differential
pressure
P/U 153k S/O 83k ROT 105k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.00 ppg Actual ECD = 10.96 ppg
Drilling Time last 24 Hrs= 1.79 hrs
ART = 0.60 Hrs AST = 1.19 Hrs. Survey & Connection time =
0.71 Hrs
Drill 6-3/4" directional hole from 10615' to 12327', sliding as
required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque off Btm = 7.9k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3500 psi on Btm with 250 psi differential
pressure
Printed: 5/312004 8:46:01 AM
)
)
··I3ªgª.~1.q...ºf···$1:
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
From - To Hours Task Code' NPT Phase.,
Description of Operation~
4/212004
00:00 - 14:25
14.42 STKOH C
PROD1 P/U 150k SIO 52k ROT 103k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D',
17:45 - 19:00
1.25 DRILL P
Calculated ECD = 10.90 ppg Actual ECD = 11.85 ppg
PROD1 Drill ahead in 6 3/4" hole from 12327' to 12732' MD (original
depth). Drilling parameters as above.
PROD1 Circulate to reduce ECD. Reciprocate & rotate (70 rpm) drill
string wihile circulating with 280 gpm @ 3230 psi.
ECD after Circulating = 11.32 ppg
PROD1 Drill 6-3/4" directional hole from 12732' to 12800', sliding as
required to maintain angle and azimuth.
14:25 - 17:45
3.33 STKOH C
19:00 - 19:30
0.50 DRILL P
19:30 - 20:00
0.50 DRILL P
Calculated ECD = 10.93 ppg Actual ECD = 11.72 ppg
PROD1 Circulate @ 12800' to reduce ECD. Riciprocate & rotate (70
rpm) drill string wihile circulating with 280 gpm @ 3230 psi.
ECD after Circulating = 11.30 ppg
PROD1 Drill 6·3/4" directional hole from 12800' to 13073', sliding as
required to maintain angle and azimuth.
WOB = 10-18 klbs
RPM = 70
Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb
GPM = 280 @ 3500 psi on Btm with 250-300 psi differential
pressure
P/U 150k S/O 52k ROT 103k
20:00 - 00:00
4.00 DRILL P
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 11.26 ppg Actual ECD = 11.77 ppg
4/3/2004
00:00 - 05:00
5.00 DRILL P
On Bottom Drilling Time last 24 Hrs= 10.73 hrs
ART = 5.29 Hrs AST = 4.81 Hrs. Survey & Connection time =
11.52 Hrs
PROD1 Drill 6-3/4" directional hole from 13073' to 13580'. Sliding as
required to maintain angle and azimuth.
WOB = 5-15 klbs
RPM = 70
Torque off Btm = 8.2k FtLb, Torque on Btm = 10-11k FtLb
GPM = 280 @ 3520 psi on Btm with 250-300 psi differential
pressure
P/U 156k S/O 56k ROT 103k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
06:00 - 07:00
1.00 DRILL P
Calculated ECD = 10.90 ppg Actual ECD = 11.64 ppg
PROD1 Circulate to reduce ECD. Riciprocate & rotate (70 rpm) drill
string wihile circulating with 280 gpm @ 3140 psi.
ECD after Circulating = 11.15 ppg
PROD1 DriIlS-3I4" directional hole from 13580' to 13698' TD. Sliding as
required to maintain angle and azimuth.
05:00 - 06:00
1.00 DRILL P
Printed: 51312004 8:46:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Pag~J6pf.34
BP EXPLORATION
Operation~sum'lJ1åry~â~p()rt
L-201
L -201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
D~t~·, FrOm-To Hours· Task Code NPT
4/3/2004 06:00 - 07:00 1.00 DRILL P PROD1
Description of QpE3Jªtiops
07:00 - 12:00
12:00 - 15:30
15:30 - 16:30
16:30 - 19:30
19:30 - 23:00
5.00 DRILL P
PROD1
3.50 DRILL P
PROD1
1.00 DRILL P
3.00 DRILL P
3.50 DRILL P
PROD1
PROD1
PROD1
23:00 - 00:00 1.00 DRILL P PROD1
4/4/2004 00:00 - 04:30 4.50 DRILL P PROD1
04:30 - 05:30 1.00 DRILL P PROD1
05:30 - 08:30 3.00 DRILL P PROD1
08:30 - 08:45 0.25 DRILL P PROD1
08:45 - 10:30 1.75 DRILL P PROD1
10:30 - 11 :00 0.50 DRILL P PROD1
11 :00 - 11 :30 0.50 CASE P CaMP
WOB = 5-15 klbs
RPM = 70
Torque off Btm = 8k FtLb, Torque on Btm = 11 k FtLb
GPM = 280 @ 3500 psi on Btm with 250-300 psi differential
pressure
P/U 150k S/O 52k ROT 103k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 10.90 ppg Actual ECD = 11.40 ppg
On Bottom Drilling Time = 2.27 hrs
ART = 1.8 Hrs AST = 0.47 Hrs. Survey & Connection time =
3.73 Hrs
Circulate & condition mud/hole from 13698'. Increase pump
rate to 300 gpm with 3425 psi. Pump 25 bbl Lo-Vis sweep.
Circulate hole clean (4.5 x Btms-up). Reciprocate & rotate (100
rpm) while circulating. Flow check. Well static. Pump slug.
Calculated ECD = 10.88 ppg
ECD prior to Wiper Trip = 11.09 ppg
POOH (Wiper Trip) to 7-5/8" Casing Shoe @ 7047'. Had one
tight spot @ 11880'. Max over-pull = 35k. Worked through
same with no other problems. Hole in good condition. Average
drag 10-15k
P/U 170k S/O 63k Off bottom with no pump.
Service TDS.
TIH with drill string to 13602' with no problems.
M/U TDS. Establish circulation. Precautionary wash & ream to
bottom @ 13698' with no problems. Circulate & condition
mud/hole from 13698'. Increase pump rate to 300 gpm with
3350 psi. Circulate hole clean (3.5 x Btms-up). Reciprocate &
rotate (100 rpm) while circulating.
Calculated ECD = 10.96 ppg
ECD prior to Wiper Trip = 11.09 ppg
Flow check. Well static. Pump slug. POOH to run 4.5" Slotted
Production Liner.
P/U 160k S/O 75k Off bottom with no pump.
POOH from 13231' to 7000' (7-5/8" Shoe @ 7047') with no
problems. Hole in good condition. Max Drag 5-10k.
Drop Circ-Sub opening dart. Break circulation. pump dart on
seat. Open eire-sub (Placed @ 175' above bit) with 1800 psi.
Stage pumps to 575 gpm with 3380 psi. Reciprocate & rotate
(70 RPM) while circulating from 6825'. No drilling cuttings
observed from Btms-up. Flow check. Well static. Pump slug.
Continue POOH from 7000' to top of BHA.
SAFETY--- Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
Remove RA Source. UD Anadrill Directional tools.
Clean Rig Floor.
RlU 4.5" Casing tongs & Liner Running equipment.
Printed: 5/312004 8:46:01 AM
)
)
, "."'BP,I;~~b~BATIQN .,
Operation,s S.u,rnrnary Report
COMP SAFETY --- Held PJSM with rig crew & BOT personnel
regarding running liner & P/U Liner Hanger-Packer assembly.
CaMP M/U 4-1/2" Guide Shoe Jt + 159 Jts of 4-1/2" 12.6# L-80
IBT-M slotted liner + 14 Jts of 4.5" 12.6# L-80 IBT-M solid
liner & BOT "Flex-Lock" Liner Hanger wi ZXP Liner Top
Packer. Total length = 7240.49'
Liner String wt = 55k.
COMP RIH with 4-1/2" 12.6# Slotted liner assembly on 4" DP to
13680' with no problems. P/U & place 4.S" Liner Shoe @
13672' .
P/U 165k SIO 69k
CaMP Drop 29/32" setting ball down DP. Pump on seat @ 4 bpm wi
600 psi. Once ball seated increased pressure to 2000 psi to set
"Flex-Lock" Liner Hanger. SIO 35k on Hanger. Continue
pressuring up to 3000 psi to set ZXP Packer. Pressure up to
4000 psi. Ball seat did not shear. P/U 12' above TBR &
release packer setting dogs. Set 50k on ZXP packer to ensure
proper setting. The 4.5" Slotted Liner Shoe set @ 13672' with
top of liner @ 6432'.
P/U on string placing end of DP @ 6358'. CBU @ 7 bpm wi
1520 psi. Flow check. Pump slug.
POOH from 6358' with 4" DP.
Finish POOH from 4700' with 4" DP. UD BOT Liner Hanger
Running Tool. Clear & clean Rig Floor.
Slip & cut 93' of drill line. Reset & check C-O-M. Adjust
brakes. Service TDS.
SAFETY ---- Held PJSM with Rig Crew, Baker Oil Tools Rep &
Anadrill personnel regarding P/U Whipstock + BHA.
M/U L 1 (OBb) Whipstock assembly. Orient with MWD. P/U 9 x
4-3/4" DC. RIH with 4" HWDP.
POOH from 1100' to change Whipstock spaceout. UD 1 Jt of
3.5" HWDP & Flex Jt. MIU Whipstock. Reorient with MWD.
Shollow test MWD-OK.
TIH with L 1 Whipstock assembly on 4" DP to 6398' (End of
seals on Spaceout assembly).
M/U TDS. Estabish circulation. Orient whipstock 1S deg lHS.
Stab dummy seal assembly into Top of tie-back sleeve (11'
sleeve) @ 6432'. Set down 20k to set whipstock anchor. P/U
10k over to verify anchor set. Set down 40k to shear whipstock
lug.
WEXIT Attempt to pressure test 7-S/8" casing to 1000 psi-Bleeding off.
Check all surface equipment. Found no surface leaks.
Attempted to test several times. Pressure bled off to 700 psi &
holding. Consult with ODE. Consensus was to continue as per
program.
WEXIT Mill Window in 7-S/8" casing from 6372 to 6384' and drill 14' of
new hole to 6398'. Work mills through window with no
problems.
NOTE: Window cut in 7-5/8" csg F/6372' to 6384'
WOB = 2-12k
RPM = 70-114
Torque = 6500 KFtLb
GPM = 2S0 @ 1500 psi
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Dà,fê ..
Ft<:>rTl,~TÖ Hours
,",':,',"".
Task 'Cöde NPT Phase
4/4/2004
11 :30 - 12:00
0.50 CASE P
12:00 - 18:00
6.00 CASE P
18:00 - 21 :00
3.00 CASE P
21 :00 - 22:00
1.00 CASE P
22:00 - 23:00 1.00 CASE P COMP
23:00 - 00:00 1.00 CASE P CaMP
4/5/2004 00:00 - 02:30 2.50 CASE P COMP
02:30 - 04:00 1.50 CASE P CaMP
04:00 - 04:15 0.25 STWHIP P WEXIT
04:15 - 07:00 2.7S STWHIP P WEXIT
07:00 - 12:00 5.00 STWHIP N HMAN WEXIT
12:00 - 14:30 2.50 STWHIP P WEXIT
14:30 - 15:00 0.50 STWHIP P WEXIT
15:00 - 16:00
1.00 STWHIP P
16:00 - 20:00
4.00 STWHIP P
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
"', .;'
:.-,.; ,:'::.;,::.;"";,.:::,:,;,':,,.:::',
Description 'of OperatiOns> .
Printed: 51312004 8:46:01 AM
Page 18 oL34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Daté Fróm- TQ' Hours Task Code NPT Phasß .. [)escription·9f()p~JéHíons
4/5/2004 16:00 - 20:00 4.00 STWHIP P WEXIT P/U 129k SIO 92k Rotate Wt = 101 k
20:00 - 21 :00 1.00 STWHIP P WEXIT Pump Hi-vis sweep & circulate hole clean from 6398' wi 290
gpm @ 1800 psi. Reciprocate & rotate drill string (110 RPM)
while circulating.
21 :00 - 21 :30 0.50 STWHIP P WEXIT Perform FIT. Pressure up on formation to 665 psi with 9.2 ppg
MOBM @ 4562' TVD = 12.0 ppg EMW. Flow check. Well
static. Pump slug. Blow down TDS & related equipment.
21 :30 - 00:00 2.50 STWHIP P WEXIT POOH with Mill Assy & 4" DP to top of BHA.
4/6/2004 00:00 - 01 :30 1.50 STWHI P P WEXIT UD 9 x 4-3/4" DC, BOT mills & related equipment. Clear rig
floor of excess whipstock milling equipment.
01 :30 - 02:30 1.00 STWHIP P WEXIT M/U ported sub. Flush out BOP's. UD sub. Blow down TDS,
C/K Lines & all Surface equipment in preparation for BOP Test.
Pull wearbushing.
02:30 - 06:30 4.00 BOPSUF P WEXIT Held PJSM. RIH with BOP Test Plug on 4" DP & seat in
wellhead. Rig Up Testing Equipment - Test BOP & Related
Surface Equipment: Test Annular, Upper And Lower Pipe
Rams, Blind Rams, Manual & HCR Valves on C/K Lines,
Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper &
Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. RID
Test Equipment. Pull test plug. Install wearbushing. Blow down
surface lines.
Witness Of BOP Test Waived By AOGCC Inspector John
Spaulding.
06:30 - 07:00 0.50 DRILL P WEXIT SAFETY--- Held PJSM with Rig Crew & Anadrill personnel
regarding picking up BHA tools & installing RA Source.
07:00 - 09:00 2.00 DRILL P WEXIT M/U (L 1, OBb) 6-3/4" Steerable Drilling assembly. Shallow test
MWD-OK.
09:00 - 12:00 3.00 DRILL P WEXIT TIH with 6-3/4" Drilling assembly on 4" DP to 6350'.
12:00 - 12:30 0.50 DRILL P WEXIT M/U TDS. Establish circulation. Orient MWD TF to 15 deg LHS
to exit window. Stop pumps. Slack off & exit window. RIH (L 1
lateral) to 6388' without any problems. Establish baseline ECD
of 10.49 ppg @ 280 gpm + 70 rpm. Wash & ream from 6388' to
6398'.
12:30 - 00:00 11.50 DRILL P PROD2 Drill 6-3/4" directional hole from 6398' to 7638'. Sliding as
required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 4.5k FtLb, Torque on Btm = 7.0k FtLb
GPM = 280 @ 2750 psi on Btm with 300-375 psi differential
pressure
P/U 125k SIO 80k Rot Wt 95k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 10.40 ppg Actual ECD = 10.9 ppg
On Bottom Drilling Time last 24 Hrs= 7.42 hrs
ART = 4.52 Hrs AST = 2.9 Hrs. Survey & Connection time =
4.08 Hrs
4(112004 00:00 - 15:00 15.00 DRILL P PROD2 Drill 6-3/4" directional hole from 7638' to 9559'. Sliding as
required to maintain inclination and azimuth.
WOB = 10-15 klbs
Printed: 5/312004 8:46:01 AM
)
')
EXPLORATION
Operations Summary Repo~t
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To Hours Task Code NPT Phase Description of: Operations '
4/7/2004 00:00 - 15:00 15.00 DRILL P PROD2 RPM = 65
Torque off Btm = 5.5k FtLb, Torque on Btm = 8.0k FtLb
GPM = 280 @ 3100 psi on Btm with 300-375 psi differential
pressure
P/U 141k SIO 72k Rot Wt 103k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 10.72 ppg Actual ECD = 11.23 ppg
15:00 - 18:30 3.50 DRILL P PROD2 Circulate & condition mudlhole prior to wiper trip from 9559'.
Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (75
rpm) while circulating.
Flow check. Well static. Pump slug.
Calculated ECD = 10.76 ppg
ECD prior to Wiper Trip = 10.86 ppg
18:30 - 20:00 1.50 DRILL P PROD2 Wiper trip. POOH to 6368' (7-5/8" window @ 6372'-6384') with
no problems. Max drag 25k. Average drag 10-15k.
20:00 - 21 :30 1.50 DRILL P PROD2 Service TDS. Change out Actuator on Lower IBOP valve.
21 :30 - 23:00 1.50 DRILL P PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit
window. Stop pumps. Slack off & exit window. TIH (L 1 lateral)
to 9466' with no problems. M/U TDS. Precautionary wash &
ream to bottom. No fill. Pump 20 bbl Lo-vis sweep.
23:00 - 00:00 1.00 DRILL P PROD2 Drill 6-3/4" directional hole from 9559' to 9589'. Sliding as
required to maintain inclination and azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 5k FtLb, Torque on Btm = 7.5k FtLb
GPM = 280 @ 3100 psi on Btm with 300-375 psi differential
pressure
P/U 140k S/O 72k Rot Wt 103k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 3D'.
Calculated ECD = 10.76 ppg Actual ECD = 11.23 ppg
On Bottom Drilling Time last 24 Hrs= 5.88 hrs
ART = 3.63 Hrs AST = 2.25 Hrs. Survey & Connection time =
10.12 Hrs
4/8/2004 00:00 - 22:00 22.00 DRILL P PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 9589' to
12172'. Sliding as required to maintain inclination and azimuth.
**** NOTE: Drilled out the top of the OBb Zone ****
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3350 psi on Btm with 300-400 psi differential
pressure
P/U 149k S/O 62k Rot Wt 97k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Printed: 51312004 8:46:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
BPEXPLORATION
Qperations Summa~y Report
page.20.ôf.34
L -201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
4/812004
00:00 - 22:00
From"'To Hours Task Code NPT Phase
PROD2
Descriptionof Op~~ßtiøf)§
22.00 DRILL P
Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg
On Bottom Drilling Time last 24 Hrs= 7.94 hrs
ART = 4.9 Hrs AST = 3.04 Hrs. Survey & Connection time =
14.06 Hrs
POOH (2 Stds) to 11933' for Geological Sidetrack after exiting
the top of the OBb sand.
Break circulation. Stage pumps to 280 gpm wI 2800 psi. Orient
TF to 135 deg RHS for Open Hole Sidetrack. Start trenching
from 11933' to 11953'.
Perform open hole sidetrack in the L 1 (OBb) lateral. Time drill
from 11953' to 11963'.
22:00 - 22: 15 0.25 STKOH C PROD2
22:15 - 00:00 1.75 STKOH C PROD2
4/9/2004 00:00 - 02:00 2.00 STKOH C PROD2
02:00 - 05:30
05:30 - 19:45
19:45 - 23:00
3.50 STKOH C
WOB = 0-2k
GPM = 280 @ 2800 psi
P/U 149k S/O 62k Rot Wt 97k
PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 11963'
to 12172' (original depth). Sliding as required to maintain
inclination and azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3350 psi on Btm with 300-400 psi differential
pressure
P/U 149k. S/O 62k. Rot Wt 97k.
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
14.25 DRILL P
Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg
PROD2 Continue drilling 6-3/4" L 1 lateral from 12172' to 13540' TD I
4565' TVD. Sliding as required to maintain inclination and
azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 8k FtLb, Torque on Btm = 9-12k FtLb
GPM = 280 @ 3300 psi on Btm with 300-350 psi differential
pressure
P/U 161 k SIO 48k Rot Wt 100k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 11.05 ppg Actual ECD = 11.55 ppg
3.25 DRILL P
On Bottom Drilling Time last 24 Hrs= 7.7 hrs
ART = 3.7 Hrs AST = 4.0 Hrs. Survey & Connection time =
12.30 Hrs
PROD2 Circulate & condition mud/hole prior to wiper trip from 13540'.
Circulate hole clean (3 x Btms-up). Reciprocate & rotate (100
rpm) while circulating.
Flow check. Well static.
Printed: 51312004 8:46:01 AM
)
)
,.:. :,
::!<¡¡}:".;,:!:.:·..S8,:~?<8:t9Bt\*IQN.;·'..:'··....'. ","".
jº:P~b~!~:gg:~.:;s:Ú:mJ)l~irY:R~PQrt
,"'," ,':';:,,':
. :':,
:.','.'';'
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To Hours Task Code NPT Phase Description of Operations
4/912004 19:45 - 23:00 3.25 DRILL P PROD2
Calculated ECD = 10.96 ppg
ECD prior to Wiper Trip = 11.01 ppg
23:00 - 00:00 1.00 DRILL P PROD2 Wiper trip. POOH to 12606' with no problems. Max drag 20k.
Average drag 10-15k. P/U Off Btm no pump = 175k S/O 60k.
4/10/2004 00:00 - 02:30 2.50 DRILL P PROD2 Continue wiper trip. POOH from 12606' to 6368' (7-5/8" window
@ 6372'-6384') with no problems. Max drag 25k @ 10679'.
Average drag 10-15k.
02:30 - 04:00 1.50 DRILL P PROD2 Slip & cut 71' of drill line. Reset & check C-O-M. Check
Drawworks brakes. Service TDS.
04:00 - 08:00 4.00 DRILL P PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit
window. Stop pumps. Slack off & exit window. TIH to 13475'.
Encountered tight hole from 10730' to 10965' & at 11830' with
25k down drag. Work through same with no other problems.
08:00 - 13:45 5.75 DRilL P PROD2 M/U TDS. Establish circulation. Precautionary wash & ream to
bottom @ 13540' with no problems. Circulate & condition
mud/hole with 280 gpm @ 3070 psi. Circulate hole clean with
5.3 x Btms-up. Reciprocate & rotate (100 rpm) while circulating.
Flow check. Well static. Pump slug.
Calculated ECD = 11.01 ppg Actual ECD = 11.44 ppg
ECD prior to Trip = 11.01 ppg
13:45 - 17:30 3.75 DRILL P PROD2 POOH from 13540' to 6559' with no problems. Place Circ-Sub
at bottom of whipstock.
Hole in good condition. Average Drag 5-15k.
P/U 172k S/O 60k off bottom with no pump.
17:30 - 18:00 0.50 DRilL P PROD2 Drop Circ-Sub opening dart. Break circulation, pump dart on
seat. Shear eire-sub with 2180 psi (Placed @ 175' above bit).
Stage pumps to 200 gpm with 500 psi. P/U on drill string
washing by window & across whipstock face. Pull bit inside
7-5/8" casing to 6364'.
18:00 - 19:00 1.00 DRILL P PROD2 Pump Lo-vis sweep. Circulate hole clean from 6189' with 450
gpm @ 2020 psi. Reciprocate & rotate (65 RPM) while
circulating. No drill cuttings observed from Btms-up. Flow
check. Well static. Pump slug.
19:00 - 21 :30 2.50 DRILL P PROD2 Continue POOH with drill string to top of BHA.
21 :30 - 21 :45 0.25 DRILL P PROD2 SAFETY m Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
21 :45 - 23:30 1.75 DRILL P PROD2 Remove RA Source. UD all Anadrill Directional tools & bit.
23:30 - 00:00 0.50 DRILL P PROD2 Clear & clean rig floor.
4/11/2004 00:00 - 00:15 0.25 STWHIP P PROD2 SAFETY --- Held PJSM with rig crew, Anadrill & Baker
personnel regarding M/U Whipstock retrieving tool (WSRT) &
BHA.
00:15 - 01 :30 1.25 STWHIP P PROD2 MIU WSRT & BHA which consists of the following: Whipstock
Hook retrieving tool + 1 Jt of 3.5" HWDP + FS + MWD +
Bumper-Sub + Oil Jar + 12 x 4-3/4" DC + XO + 24 x 4" HWDP
= 1199.63'. Shallow test MWD-OK.
01 :30 - 03:30 2.00 STWHIP P PROD2 TIH with WSRT BHA on 4" DP to 6328'.
03:30 - 04:00 0.50 STWHIP P PROD2 M/U TDS. Break circulation. Stage pumps to 244 gpm w/1330
psi. Orient WSRT to 15 deg LHS. (P/U Wt 132k S/O Wt 90k).
Slack off on drill string to 6378'. P/U & engage whipstock.
Pull on whipstock with 60k overpull. no release. Jar on
whipstock 3 additional times with 65k over pull & release
Printed: 5/312004 8:46:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
BP EXPLC>HATION
. , ,'.,' ." " ,"'" '-'''',' ", :..~ '" "', : :', .. '-,.:':;
Opç~ªti.pn.~....Sg,rtOTI.ªtY.frgp()rt
Page 22 of 34
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
4/11/2004
03:30 - 04:00
From,,:,Tp Hours Task €odeNPT
Description ofOperati0r1~
Date
04:00 - 05:00
05:00 - 07:30
07:30 - 11 :00
11 :00 - 12:00
12:00 - 12:15
12: 15 - 19:30
0.50 STWHIP P
PROD2
1.00 STWHIP P
PROD2
2.50 STWHIP P
3.50 STWHIP P
PROD2
PROD2
1.00 CASE P
0.25 CASE P
COMP
CaMP
7.25 CASE P
COMP
19:30 - 20:00 0.50 CASE P COMP
20:00 - 00:00 4.00 CASE P COMP
4/12/2004 00:00 - 01 :00 1.00 CASE P CaMP
01 :00 - 02:00
02:00 - 02:30
02:30 - 03:30
1.00 CASE P
COMP
0.50 CASE P
COMP
1.00 CASE P
COMP
whipstock. P/U & pull seals out of bottom tie-back receptacle.
Pull whipstock up to 6358' (P/U Wt = 138k). Monitor well 5
minutes. Annulus level fell +1- 20'.
CBU from 6358' with 200 gpm @ 875 psi. Lost 12 bbl mud at
start of circulating. Lost another 2 bbl mud while circulating
Btms-up. Flow check. Fluid level dropping very very slow.
Pump slug.
POOH with whipstock assembly #1 to top of BHA.
Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock
retrieving tool, L 1 Whipstock & 3.5" DP space-out assembly.
100% recovery of all Whipstock & downhole tools. Clear &
clean rig floor.
Rig up 4.5" Liner running equipment.
SAFETY--- Held PJSM with rig crew & BOT personnel
regarding running liner & P/U Hook Hanger assembly.
M/U 4-1/2" Float Shoe (Bent) Jt + 155 Jts of 4-1/2" 12.6#,
L-80, IBT-M slotted liner'. Continue TIH. Tag up on the "Mother
Bore" liner top packer @ 6432'. POOH to 6378' which is
mid-point of window. Apply one round of RHT in string. Slack
off & exit 7-5/8" window into open hole with no other
problems. Continue running 15 additional Jts of 4.5" slotted liner
(170 Jts Slotted) + 1 Jt of solid liner + XO Pup Jt & BOT
Flanged Hook Hanger assembly. Total length = 7138.16'
P/U Wt = 98k S/O Wt = 70k Theoretical Liner Wt in mud
= 77,500 Lbs
Change elevators to fit 4" DP. RID Hydraulic Casing Tongs &
related equipment.
Continue RIH with 4-1/2" slotted liner on 50 Stds of 4" DP to
11809'.
P/U 148k SIO 55k
Continue RIH with 4.5" Slotted Production liner from 11809'.
Tag-up solid @ 13163'. Note: Had 50 Stds of 4" DP + 8 stds 4"
HWDP + 4 stds 4-3/4" DC's + 2 stds & double of 4" DP . Work
string 60' up & down four times. Stacking out all available
weight with string stopping @ 13163' each time.
M/U TDS. Establish circulation. Stage pumps to 6 bpm @ 1200
psi to help reduce friction between drill string & casing.
Continue working string 30' to 60'. String starting to move down
slowly. Reduce pump rate to 3 bpm with 365 psi. Continue
working string down from 13163' to 13516' (That places the
Hook-Hanger 10' past bottom of 7-5/8" window @ 6384'). Stop
pumps.
P/U 200k SIO 58k
P/U on string & position Hook-Hanger @ 6340'. Rotate 1/4
turn. Run in & go past hook point. Pull back up with
Hook-Hanger to 6340'. Rotate additional 1/4 turn. Run back
down & land Hook-Hanger on the lower lip of 7-5/8" window @
6384'. Reconfirm Hook-Hanger landed by picking up 20' &
relanding same. Did this three times with Hook-Hanger landing
out in same spot every time. Stack out all available string
weight + 10k from TDS down on Hook-Hanger (+1- 33k).
Drop 29/32" ball & pump on seat. Pressure up to 2700 psi to
Printed: 5/312004 8:46:01 AM
)
)
·······I3REXP4QßAsTIQm.,.:,::,¡:············
.O.P~·~ª~.i,9.6.$:·.···ª:ym:Îj).ª.rS',:.R~P9·rt
COMP release HWH Running tool. P/U Drill string 10' (P/U 135k) &
verify HWH Running tool released. Lost 60k string wt. Set back
down & tag Hook-Hanger with 25k-OK. P/U on string & place
HWH Running tool @ 6335' (32' above Hook Hanger @ 6367').
RlU Side Entry Pump-in sub into the 4" DP. Pressure up to
4750 psi & blow ball seat. RID pump-in sub. M/U TDS.
CBU from 6335' with 6 bpm @ 960 psi. Flow check. Well static.
Pump slug. Blow down TDS.
POOH with 4" DP from 6335' to surface. UD Baker HWH
Running tool. Clear & clean rig floor.
SAFETy---- Held PJSM with Rig Crew & Baker Service Rep
regarding P/U LEM & ZXP Packer assembly.
M/U LEMIZXP assembly on 4" DP.
TIH with LEMIZXP assembly on 60 Std of 4" DP + 8 Std of 4"
HWDP to 6316'.
M/U TDS. RIH slowly to 6330'. Establish up & down string
weights, P/U 125k S/O 100k. Slack off on string to set the
LEM into the hook hanger collet @ 6362' with the 4.75" OD
Seals stung into the Lower (OBd lateral) Seal Bore Extension
@ 6475'. Land LEM with 20k. P/U 10k to verify set, then slack
off 10k on ZXP packer & park pipe. Drop the 29/32" setting
ball and pump onto seat @ 2 bpm wI 210 psi. Pressure up to
2500 psi, wait 2 minutes, then increased pressure to 2900 to
set the ZXP packer. At this point in time while pressuring up to
release the Baker Type "HRD" Packer Setting tool which was
pinned to shear @ 3600 psi, the ball seat sheared prematurely
at 3350 psi.
CaMP Pressure test ZXP Packer x 7-5/8" casing to 1500 psi for 15
minutes. Lost 75 psi.
DFAL CaMP Attempt to release from ZXP Packer. Work string up to 135k
(10k Over-pull) & down to 50k with no success. Apply 2.5 Left
Hand turns into string. Work torque down & attempt to release
Packer Setting Tool. Tool would not release. Pull up to 150klbs
(-25 klbs over PU wt). Still not indicating that Setting tool is
released from L TP assembly.
NOTE: The Baker Type "HRD" Setting Tools primary releasing
mechanism is hydraulic with an emergency mechanical
back-up Left-hand release.
DFAL COMP 9ES Rig Team discussed downhole tool failure problem with
the BP ODE & Baker Engineers. After evaluating the options it
was decided to drop a 1.75" aD Steel Ball down the string, let
gravitate on seat. Then pressure up to 4200 psi on the drill pipe
to ensure that the ZXP Packer & Hold Down slips are fully set
& also to shear the hydraulic release mechanism on the Packer
Setting tool.
DFAL COMP Waiting on Baker to deliver a 1.75" OD Steel Ball to the rig.
DFAL COMP Break off TDS from DP. Drop the 1.75" aD Steel Ball down 4"
DP. MIU TDS. Let ball gravitate on seat.
DFAL CaMP Pressure up on drill string to 4200 psi. Hold for 10 minutes.
Release pressure. P/U on string. Packer Setting tool free. P/U
12' to & position the rotating Dog Sub on HRD Setting tool
above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack
off on string & slam 65klbs down weight on ZXP Packer.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
. -.' ' . . " .
4:>ªtØ/ .... :F~orn.- To Hours ·Tpsk Code NPT Phase
4/12/2004
02:30 - 03:30
1.00 CASE P
03:30 - 04:30 1.00 CASE P COMP
04:30 - 07:30 3.00 CASE P COMP
07:30 - 08:30 1.00 CASE P caMP
08:30 - 09:00 0.50 CASE P COMP
09:00 - 15:30 6.50 CASE P caMP
15:30 - 17:00 1.50 CASE P caMP
17:00 - 17:30
0.50 CASE P
17:30 - 18:00
0.50 CASE N
18:00 - 20:30
2.50 CASE N
20:30 - 21 :30
21:30 - 23:00
1.00 CASE N
1.50 CASE N
23:00 - 23:30
0.50 CASE N
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of Operations
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Operations Summary Report
Page 24 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Qatø From -To Hou rs Task Code. NPT Phase ·Description of Operations
4/12/2004 23:00 - 23:30 0.50 CASE N DFAL CaMP Repeated this process 5 additional times.
NOTE: Top of "L 1" ZXP Packer @ 6319' MDRKB.
23:30 - 00:00 0.50 CASE P COMP Break out TDS. Pull one std of 4" DP & rack in derrick. Blow
down TDS & suriace equipment.
4/13/2004 00:00 - 01 :30 1.50 CASE P COMP Slip & cut drill line. Reset & check C-O-M. Check drawworks
brake system. Service TOS.
01 :30 - 04:30 3.00 CASE P COMP POH (Wet) with 4" DP work string. UD Baker "HRD" Setting
Tool.
NOTE: The Dog sub was sheared on setting tool but the shear
screws on the emergency mechanical release mechanism did
not shear.
04:30 - 05:00 0.50 CASE P COMP Clean rig floor of excess MOBM that was generated from Wet
Trip.
05:00 - 09:30 4.50 BOPSUP P WEXIT Drain stack & pull wear ring. Hold PJSM. Test BOPE to 250
psi/3500 psi. Lower pneumatic well control valve would not test.
Witness of test waived by Jeff Jones - AOGCC.
09:30 - 10:30 1.00 BOPSUP P WEXIT Blow down lines. Install wear ring.
10:30 - 12:30 2.00 BOPSUF P WEXIT PJSM. Change out lower well control valve, pressure test to
250 I 3500 psi.
12:30 - 13:00 0.50 STWHIP P WEXIT Bring Baker whipstock tools to floor.
13:00 - 13:30 0.50 STWHIP P WEXIT PJSM with all personnel on handling and running Baker
whipstock.
13:30 - 15:30 2.00 STWHIP P WEXIT M/U whipstock BHA wI 3 1/2" spaceout and dummy seal
assembly hanging below, orient MWD wI whipstock
15:30 - 16:30 1.00 STWHIP P WEXIT RIH wI collars and HWDP, shallow test MWD
16:30 - 20:00 3.50 STWHIP P WEXIT RIH wI whipstock on 4" drillpipe, fill pipe at 4000',6250', 135K
UP, 95K DN, no pump
20:00 - 21 :00 1.00 STWHIP P WEXIT Orient whipstock 7 degrees left of high side at 50' above setting
depth, slack off and stab dummy seal into tieback sleeve on
L-1 at 6319', set down 20K to set whipstock anchor, continue to
set down 35K and shear mills off whipstock, test casing to
1500 psi, bled down 70 psi in 7 minutes,
21 :00 - 00:00 3.00 STWHIP P WEXIT Record SPR's. Start ¡ntiat cut to place Top of Window at 6229'
DPM. 130K UP, 93K DN, 105K RT, 3K WOB, 118 SPM,
290 GPM, 1840 PSI, 100 RPM, 6K TQ, Mill window to 6237'
MN Depth.
4/14/2004 00:00 - 00:30 0.50 STWHIP P WEXIT Mill window from 6237' to 6241', drill new hole from 6241' to
6254'
RT WT 105, GPM 290, SPP 1890 psi, RPM 100, TQ 6000
00:30 - 01 :30 1.00 STWHIP P WEXIT Circulate high vis sweep S/S, 295 GPM, 1775 PSI, working
string mills
01 :30 - 02:00 0.50 STWHIP P WEXIT Periorm FIT test to EMW 12.0 ppg, applied suriace pressure
650 psi, mud weight 9.2 ppg MOBM
02:00 - 04:00 2.00 STWHIP P WEXIT Monitor well, pump dry job, POH
04:00 - 05:30 1.50 STWHIP P WEXIT Stand back HWDP, Lay down DC, Lay down milling BHA,
string mill in guage at 6.75"
05:30 - 06:00 0.50 STWHIP P WEXIT Clean and clear rig floor
06:00 - 06:30 0.50 STWHIP P WEXIT M/U ported sub, jet BOP stack
Recovered a total of 130 Ibs of metal from milling and jetting
stack
06:30 - 08:30 2.00 DRILL P WEXIT PJSM wI Anadrill DO I MWD and all rig crew, picking up of
BHA # 11 and installing RA source,
Printed: 5/312004 8:46:01 AM
)
)
a~:.··IE2<RJ4Q8ATt~.r~~',·':'·······
Q,perati oos·.SÜl1imârY·'··R:~!pörf"~'
RIH w/ stands to 1172', test MWD, RIH to 6208'
Circulate to obtain SPR / ECD baseline of 10.56 ppg
S/O through TOW at 6229' wi no pump, continue to drill from
6254' to 7607'
123K UP, 80K DN, 99K RT WT, 114 SPM, 280 GPM, 2700
PSI ON
2330 PSI OFF, 65 RPM, 4.5 - 6.5K TO ON, 4.3 TO OFF, 3K
- 12K WOB
Calculated ECD 10.29 ppg, Actual ECD 10.72 ppg, Backream
each stand,
Survey every 30', slide as per DD
AST 1.88 hrs, ART 2.41 hrs
128K UP, 86K DN, w/ no pumps
PROD3 Directional Drill from 7607' to 9249',
127K UP, 86K DN, 104K RT, 114 SPM, 280 GPM, 2823
PSI ON,
2607 PSI OFF, 65 RPM, 4.5 - 7K TO ON, 4.5K TO OFF, 5-
10WOB
Calculated ECD 10.38 ppg, Actual ECD 10.92 ppg
Backream each stand, Survey every 30', slide as per DD.
PROD3 Directional Drill from 9249' to 10,027'
140K UP, 76K DN, 101K RT, 114 SPM, 280 GPM, 3140
PSI ON
2780 PSI OFF, 65 RPM, 8 -11 TO ON, 7.1K TO OFF, 5 -15
WOB
Calculated ECD 10.64 ppg, Actual ECD 11.67 ppg
Backream each stand, Survey every 3D', AST 1 hr, ART
2.36 hrs
PROD3 Circulate bottoms up to lower ECD from 11.67 ppg to 11.23
ppg
Add 50 bbls L VT -200
PROD3 Directional Drill from 10,027' to 10,679'
142K UP, 72K DN, 101K RT, 114 SPM, 280 GPM, 3140
PSI ON
2860 PSI OFF, 65 RPM, 7 - 8.5K TO ON, 7.6K TO OFF, 5-
10 WOB
Calculated ECD 10.75 ppg, Actual ECD 11.47 ppg
Backream each stand, Survey every 30', slide as per DD
AST 1.24 hrs, ART 2.69 hrs
Circulate bottoms up twice, Calculated ECD 10.77 ppg, Actual
ECD 11.48 ppg, Circulate at 280 GPM, 2850 PSI, 80 RPM,
ECD after circulating 11.19 ppg
Monitor well, POH 5 stds, pump dry job, intermittent drag 5 -
20K, POH to window, no problems coming thru window, POH
to 6208'
Rig service, service top drive and crown
Slip / cut 52' of drilling line
During TO service, found capscrews locating Top Drive brake
disc in place on traction motor shaft had sheared off so TD
brake is not functioning. Inspect & repair same.
Orient MWD high sde, slide past whipstock wi no pump, fill
pipe and test MWD at 7000', RIH to 9000', fill pipe, no pump,
continue to 10,285', start to wash down, 250 gpm, 50 rpm,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Date From-, To Hours ,:Task Code NPT Phase
4/14/2004 08:30 - 11 :30 3.00 DRILL P WEXIT
11 :30 - 12:00 0.50 DRILL P WEXIT
12:00 - 00:00 12.00 DRILL P PROD3
4/15/2004
00:00 - 12:00
12.00 DRILL P
12:00 - 17:00
5.00 DRILL P
17:00 - 18:00
1.00 DRILL P
18:00 - 00:00
6.00 DRILL P
4/16/2004 00:00 - 01 :30 1.50 DRILL P PROD3
01 :30 - 04:30 3.00 DRill P PROD3
04:30 - 05:00 0.50 DRILL P PROD3
05:00 - 06:00 1.00 DRILL P PROD3
06:00 - 10:00 4.00 DRILL N RREP PROD3
10:00 - 13:30 3.50 DRILL P PROD3
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of Operations
Printed: 51312004 8:46:01 AM
BP EXPLORATION
O.peratiol'1s Summ,ªryRep()r~
Page 26 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From.~To Hours Task Code NPT Phase ..... pescriptiooofoperéltions
4/16/2004 10:00 - 13:30 3.50 DRILL P PROD3 2580 psi, 12.0 ECD
13:30 - 14:30 1.00 DRILL P PROD3 At 10,285' circulate bottoms up, drop EGD from 12 to 11.20
ppg, 250 gpm, 2580 psi, 50 rpm
14:30 - 15:00 0.50 DRILL P PROD3 RIH from 10,285' to 10,585', wash from 10,585' to 10,679'
15:00 - 00:00 9.00 DRILL P PROD3 Dir Drill from 10,679' to 11,436', UP WT 148K, DN WT 56K,
RT WT 102K
290 GPM, 3220 PSI ON, 2925 PSI OFF, 8 - 12 TO ON, 8.6
TO OFF,
Cal ECD 10.66 ppg, Act ECD 11.38 ppg, 65 RPM,
Backream each stand, driil rate up stroke, reduce rate to 250
gpm down stroke
Slide as per DD, AST 1.78 hrs, ART 1.24 hrs
4/17/2004 00:00 - 02:00 2.00 DRILL P PROD3 Dir Drill from 11,436' to 11,625'
154KUP, 58KDN, 102RTWT, 118SPM, 2910 PSI OFF
3290 PSI ON, Gal ECD 10.70, Act ECD 11.31
Backream each stand at drilling rate up, 250 gpm down stroke
02:00 - 03:30 1.50 DRILL N WAIT PROD3 Circulate while wellsite Geologist consults with Anchorage
Geology team.
03:30 - 11 :30 8.00 DRILL P PROD3 Dir drill from 11,625' to 12,359'
151K UP, 54K DN, 103K RT WT, 118 SPM, 3000 PSI OFF
3180 PSI ON, 8 - 10K TO ON, 8.4K TO OFF, 5 - 10K WOB
Cal EGD 10.75, Act EGD 11.48, AST 1.8, ART 2.52
Backream each stand at drilling rate up, 250 gpm down stroke
11 :30 - 12:30 1.00 DRILL P PROD3 Circulate to drop ECD from 11.75 to 10.71 ppg
280 GPM, 2936 PSI, 65 RPM
12:30 - 23:00 10.50 DRILL P PROD3 Dir Drill from 12,359' to 13,106'
157K UP, 55K DN, 103K RT WT, 118 SPM, 3014 PSI OFF
3355 PSI ON, 9 - 11K TO ON, 9K TO OFF, 5 - 10K WOB
Cal EGD 10.41, Act ECD 10.80, AST 2.1, ART 1.75
Backream each stand at drilling rate up, 250 gpm down stroke
23:00 - 00:00 1.00 DRILL P PROD3 Circulate to drop ECD from 10.80 to 10.41 ppg
290 GPM, 3350 PSI, 65 RPM
4/18/2004 00:00 - 00:30 0.50 DRILL P PROD3 Dir Drill, slide from 13,106' to 13,114'
152KUP, 58KDN, 100KRTWT, 114SPM, 280GPM
3350 PSI ON, 3010 PSI OFF, 1 - 5K WOB, 10K TO ON,
9K TO OFF, Cal ECD 10.80, Act ECD 11.25
00:30 - 01 :00 0.50 DRILL N DFAL PROD3 Circulate and test mud motor, motor on bottom causes
pressure spike.
Unable to operate motor within limits (acts as if pumping thru a
stalled motor). Geologist consults Anchorage and they are
prepared to call this TD for lateral L2.
01 :00 - 03:30 2.50 DRILL N DFAL PROD3 Circulate to drop ECD from 11.25 to 11.10 actual, calculated
10.80 ppg for wiper trip.
03:30 - 08:00 4.50 DRILL N DFAL PROD3 Wiper trip to window, flow check, pull 5 stands, flow check,
pump slug, Minor drag at 12710' & 11120' (15 klbs over normal
drag). Drop back down thru same and come back thru - OK.
Continue up inside window without further tight spots or
problems.
08:00 - 08:30 0.50 DRILL P PROD3 Service top drive.
08:30 - 09:30 1.00 DRILL N DFAL PROD3 Attempt to break circ to orient for exiting window. Circ pressure
4000 psi @ 200 gpm. Discuss with Anch DE and agree to POH
for new motor. Drop circ sub ball and open same. Circ casing
clean at 450 gpm @ 1900 psi. Monitor well & pump dry job.
Printed: 51312004 8:46:01 AM
)
')
SP,EXPUQRAIION
,',,>ºÞ~rª~lQl1s~$l.Imm,ªrY'=f~p,Qr~
.' .,;-"..; .....j,'>:..,,:'-,..
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Ö~te From - To Hours Task Code NPT Phåse
4/18/2004 09:30 - 12:30 3.00 DRILL N DFAL PROD3
12:30 - 14:00 1.50 DRILL N DFAL PROD3
14:00 - 14:30 0.50 DRILL N DFAL PROD3
14:30 - 15:00 0.50 DRILL N DFAL PROD3
15:00 - 17:00 2.00 DRILL N DFAL PROD3
17:00 - 22:30 5.50 DRILL N DFAL PROD3
22:30 - 00:00
1.50 DRILL N
DFAL PROD3
4/19/2004
00:00 - 04:30
4.50 DRILL P
PROD3
04:30 - 08:00
3.50 DRILL P
PROD3
08:00 - 16:00
8.00 DRILL P
PROD3
16:00 - 17:00
17:00 - 17:30
17:30 - 18:00
18:00 - 19:30
19:30 - 21 :00
21 :00 - 22:30
22:30 - 23:00
1.00 DRILL P
0.50 DRILL P
0.50 RUNCOtvP
1.50 RUNCOtvP
1.50 RUNCOtvP
1.50 RUNCOtvP
0.50 RUNCOtvP
PROD3
PROD3
CaMP
COMP
CaMP
COMP
COMP
23:00 - 23:30 0.50 RUNCOtvP COMP
23:30 - 00:00 0.50 RUNCOtvP COMP
4/20/2004 00:00 - 04:00 4.00 RUNCOtvP COMP
04:00 - 05:30 1.50 RUNCOtvP COMP
05:30 - 06:30 1.00 RUNCOtvP CaMP
06:30 - 07:30 1.00 RUNCOtvP CaMP
07:30 - 16:00 8.50 RUNCOtvP CaMP
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
, ,. :.",. '::.',,: .,::. :." , ,:,,":" ':'" -',' <:: :,:~,,: '. .,:·:i. ':.
Descriptio~"()fOperåti8h§i "
POH for motor changeout. Will go back in with new 1.15 deg
AIM motor and no Neutron/Density tool to drill remaining 400'
of hole as agreed by Anch Geology and ODE.
PJSM, w/ MWD, DD, rig crew on handling of source, handling
BHA, change out motor, bearing pack gone
Clear and clean rig floor
Down load MWD and LWD, up load VPWD
Make up bit # 9, run BHA # 12
RIH to 1500', shallow test MWD, RIH to 6229', orient 7 left of
highside, slide through window, RIH to 10,000', fill drillstring,
RIH to 10,935', taking weight approx 25k, to 110988' and again
at 11680'. Wash from 13,010' to bottom. Estimate losing
approx 75 bbl mud to formation during trip.
Circulate to lower initial ECD on bottom of 12.14 to 10.81 ppg
213 GPM, 2058 PSI
Directional drill from 13,114' to 13,490', TD for lateral # 3
157KUP, 56KDN, 99KRT, 10-15KWOB, 118SPM, 290
GPM
2920 PSI OFF, 3150 PSI ON, 10K TQ ON, 9K TQ OFF
Circulate throughout to keep calculated ECD at 10.81 ppg,
actual 11.41 ppg.
Mud seepage loss to well at 1·2 bph.
Circulate to lower actual ECD from 11.41 ppg to 11.08 ppg for
trip out.
Calculated ECD 10.88 ppg plus 0.2 = 11.08 ppg. Current ECD
= 11.01 ppg.
Moniter well, pump dry job, POH, intermitten overpull of 5 -
15K, record up / dn WT every 5 stands in open hole, every 10
stands in casing
Lay down directional drilling BHA # 12
Clean and clear rig floor
Pick up / make up whipstock retrieving BHA
Pick up / make up 24 x 4 3/4" DCs from pipe shed 1 x 1
Trip in to 6167' w/ drillpipe
Rig service, service top drive / crown
Orient 7 left high side, slide hook down to 6235', work down,
latched in on second attempt, pick up to 175K and set jars off,
pick up to 200K and set off jars, pick up to 21 OK, whipstock
free, trip to 6200', UP WT 140K, DN WT 95K
Circulate bottoms up, 275 GPM, 1750 PSI, losses of 17 bbls
downhole in first 10 minutes of circulating, monitor well bore,
pump dry job
Trip out with whipstock and assembly, UP WT 150K
Trip out slowly with whipstock
Lay down whipstock retrieving BHA, lay down whipstock and
tail space out tubulars.
Clean and clear rig floor
Rig up to run 41/2" L-80 slotted liner
PJSM, RIH w/ slotted liner, make up to mark, 2300 ft Ibs
torque, use BOL 2000 NM dope, run at 90 seconds per joint in
casing, RIH to middle of window at 6235', RIH with joint # 152,
10' down taking wt at 6330', POH to middle of window, tum
pipe 1/4 tum work tq down, RIH to 6330' taking wt, POH to
Printed: 5/312004 8:46:01 AM
BP EXPL.ORA TION
, ºper~tiQlJsSul1Jmary. Report
Page 28 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
: [)ªte From - To Hours Task Code NPT Phase Description of Operß.ti()ps
4/20/2004 07:30 - 16:00 8.50 RUNCOtvP COMP 6235', turn 1/4 turn, bent jt through window on 4 th attempt,
liner in open hole, run speed 60' per minute, make up hook
hanger,100K UP WT, 70K DN WT, ran total of 171 jts of 4
1/2" liner
16:00 - 21 :30 5.50 RUNCOtvP COMP Change out casing equipment, rig to run stands from derrick,
RIH to 13,458', 190K UP WT, 55K DN WT
21 :30 - 23:00 150 RUNCOtvP CaMP RIH to 10' past hook hanger at 13,458', turn pipe 1/4 turn, work
tq in pipe, work down past window, turn pipe 1/4 turn, work tq
down, work past window, failed at 2 more attempts, turn pipe
1/8 turn, work tq down, work hook past window, continue
turning 1/8 turn and working past pipe down window. 200K UP
WT, 50K DN WT
23:00 - 00:00 1.00 RUNCOrvP COMP Land Hook hanger, drop 29/32" ball, pump first 30 bbls at 4
bpm, 636 psi, reduce to 2 bpm, 175 psi for 15 bbls, pump 1 bbl
to seat, pressure to 3000 psi, release HR tool, free pick up wt
140K, lost 60K, pressure up and shear ball seat at 4400 psi
4/21/2004 00:00 - 00:30 0.50 RUNCOtvP COMP Circulate bottoms up at 375 gpm, 2290 psi, with pumps off tag
up, top of hook hanger at 6224', 11 .5' up on stand 51, monitor
wellbore, pump dry job
00:30 - 05:00 4.50 RUNCOtvP CaMP Trip out, lay down 12 x 43/4" DCs,
05:00 - 06:00 1.00 RUNCOtvP COMP Lay down Baker liner running tools
06:00- 06:30 0.50 RUNCOtvP COMP Clean and clear rig floor
06:30 - 07:30 1.00 RUNCOtvP COMP Drain BOP stack, pull wear bushing, install test plug
07:30 - 11 :30 4.00 RUNCOtvP COMP PJSM, PT BOP and all related equipment to 250 psi low,
3500 psi high
Perform D4 accumulator function test
Witnessing waived by Lou Gramaldi AOGCC
Pull test plug, install wear bushing
11 :30 - 12:00 0.50 RUNCOtvP COMP Rig service, service top drive
12:00 - 13:30 1.50 RUNCOtvP COMP Rig up, pick up, make up LEM # 2 assembly, make up to mark
3200 ft Ibs, use BOL 2000 dope, make up seal bore assembly
to 4600 ft Ibs
13:30 - 15:00 1.50 RUNCOtvP COMP RIH slow on DCs, mud overflowing pick up subs, make up top
drive to HWDP
15:00 - 17:00 2.00 RUNCOtvP COMP RIH through hook hanger at 6224', slide through no problems
135K UP WT, 95K DN WT
17:00 - 18:00 1.00 RUNCOtvP COMP Appear to have tagged up 13' higher, ( collar from LEM
hanging up in hook hanger?) gives appearance of positive
orientation and collet latch in hook hanger, two attempts,
third attempt turn LEM 1/2 tum, work down to proper depth of
6345'
18:00 - 19:00 1.00 RUNCOtvP COMP Drop ball, pump 4 bpm at 713 psi for 30 bbls, pump 2 bpm at
236 psi for 11 bbls, pump 1 bpm at 100 psi until ball seated,
pressure up to 4000 psi to set ZXP packer, pick up to 135K
UP WT, pick up 10' to release rotating dogs, rotate setting
dogs at 20 rpm, to verify packer set, pressure test annulus to
1500 psi for 10 minutes, charted, top of ZXP packer at
6173.40 '
19:00 - 19:30 0.50 RUNCOtvP CaMP PJSM with BAKER rep and rig crew, pressure up to 3000 psi
with rig pump, pressure up to 5200 psi with test pump, blow
ball seat
19:30 - 20:30 1.00 RUNCOtvP CaMP Circulate bottoms up at 114 spm, 1217 psi, monitor wellbore,
pump dry job
Printed: 5/312004 8:46:01 AM
)
)
··E?F?E><P4Q~A¡ION
.··.····.o,ñer:addns:,silirnrnar"Rep,ort
-::"~.'.::;:-~': ,,"\:: :';:':'-; . "':' .. .'::,;,.>" .,...,'.' ,"':-:- ','",; ::'~";:><': >:': :"';',,:::":'." :.:">""";', ',:' ::' 1:', ': ,": :. ":'¡", : -: :: :' .::
.." .' '~ ' ' . :: .
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
:Qªt$i From·-)[o Hours Task Code NPT Phase
4/21/2004 20:30 - 00:00 3.50 RUNCOfv1\J DFAL CaMP
4/22/2004 00:00 - 03:00 3.00 RUNCOfvP CaMP
03:00 - 03:30 0.50 RUNCOfvP CaMP
03:30 - 04:30 1.00 STWHIP N DFAL WEXIT
04:30 - 13:00 8.50 STWHIP N DFAL WEXIT
13:00 - 14:30 1.50 STWHIP N DFAL WEXIT
14:30 - 15:00 0.50 STWHIP P WEXIT
15:00 - 15:30 0.50 STWHIP P WEXIT
15:30 - 17:00 1.50 WHIP P WEXIT
17:00 - 18:00 1.00 WHIP P WEXIT
18:00 - 20:30 2.50 WHIP P WEXIT
20:30 - 21:00 0.50 WHIP P WEXIT
21 :00 - 21 :30 0.50 WHIP P WEXIT
21 :30 - 00:00 2.50 STWHIP P WEXIT
4/23/2004
2.00 STWHIP P
00:00 - 02:00
WEXIT
02:00 - 02:30 0.50 STWHIP P WEXIT
02:30 - 03:00 0.50 STWHI P P WEXIT
03:00 - 05:00 2.00 STWHIP P WEXIT
05:00 - 07:00 2.00 STWHIP P WEXIT
07:00 - 07:30 0.50 STWHIP P WEXIT
07:30 - 08:00 0.50 STWHIP P WEXIT
08:00 - 09:00 1.00 DRILL P WEXIT
09:00 - 09:30 0.50 DRILL P WEXIT
09:30 - 10:00 0.50 DRILL P WEXIT
10:00 - 12:00 2.00 DRILL P WEXIT
12:00 - 13:00 1.00 DRill P WEXIT
13:00 - 14:00 1.00 DRILL P WEXIT
14:00 - 14:30 0.50 DRILL P WEXIT
14:30 - 00:00 9.50 DRILL P PROD4
... Pag(9 29.0134
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of Operations
POH, lay down 192 jts DP to pipe shed, 133K UP WT, 95K
DNWT
Trip out laying down drill pipe and HWDP for hard banding
wear.
Lay down LEM running tools
Trip in 10 stands drillpipe from derrick, lay down same for
hardbanding wear
Pick up, make up, trip in drill pipe 1 x 1 to replace layed out
drillpipe
Trip out racking back 42 stands of drillpipe
Clear and clean rig floor
Rig service, service top drive and crown
PJSM, Baker rep and rig crew, p/u, m/u, seal and whipstock
assembly, orient same
RIH with DCs and HWDP, 90 seconds per stand
RIH with drillpipe at 90 seconds per stand
Orient whipstock at 14 degrees left of high side, set anchor with
15K down at 6185', pick up to 145K, slack off to 35K, shear
starting mill off whipstock at 42K
Pressure test casing to 1500 psi for 5 minutes, circulate and
record SPRs
Begin milling at 6025', TOW, to 6031'
7K WOB, 135K UP WT, 90K ON WT, 107K RT WT, 290
GPM, 1798 PSI, 100 RPM, 7 - 8 TO
Adding 200 bbls of new 9.2 ppg MOBM to active system while
milling
Mill window from 6031 to 6050', TOW 6025', BOW 6037',
open hole from 6037' to 6050'
7 -10K WOB, 135K UP WT, 90K ON WT, 107K RT WT, 290
GPM, 1798 PSI, 100 RPM, 8 - 9 TO
Circulate 50 bbl high vis pill, 60% increase in cuttings when pill
at shaker
FIT test to 12 ppg mud, applied surface pressure 650 psi,
mud weight 9.3 ppg, TVD 4440', pressure bled down from 650
psi to 600 psi in 7 minutes, then held steady
Monitor wellbore, pump dry job, trip out with mill BHA
Stand back HWDP, lay down DCs, lay down milling BHA,
mills in guage
Clean and clear rig floor
Flush stack with ported sub
PJSM, PU, MU, bit # 4, BHA # 13
PJSM, load source in directional BHA
RIH with BHA, shallow test MWD at 1500'
RIH to 5932', fill pipe
Rig service, slip and cut drilling line
Rig service, service top drive, crown
Break circulation, orient to 10 degree left of high side, obtain
baseline ECD mud weight 9.2 ppg, ECD 10.03 ppg
Directional drill from 6050' to 6773'
116K UP WT, 82K ON WT, 105K RT WT, SPM 113, GPM
280, RPM 40
TO ON 5.3, TQ OFF 3.5, Cal ECD 10.13, Act ECD 10.46
Printed: 51312004 8:46:01 AM
BPEXPLORATION
Operations. Su m mCiry ..Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L -201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Page.3001.34
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Directional drill from 6773' to 7147'
114 SPM, 290 GPM, 40 RPM, 9 - 11 TO ON, 8.7 TO OFF,
Problems with MWD survey accuracy, a large difference from
surveys and corrected surveys, roll test MWD, talk with
Anadrill directional engineer about survey accuracy, decision to
drill ahead
PROD4 Directional drill from 7147' to 7981'
113 SPM, 276 GPM, 2500 PSi, 40 RPM, 10 - 11 TO ON,
8.9 TO OFF,
Cal ECD 10.26, Act ECD 10.95, AST 1.24, A TR 3.02
PROD4 Directional drill from 7981' to 8630;
113 SPM, 273 GPM, 2540 PSI, 80 RPM, 6 TO ON, 5.5 TO
OFF,
Cal ECD 10.42, Act ECD 11.17
PROD4 Circulate to lower ECD from 0.8 over to 0.6 over calculated
ECD of 10.42
PROD4 Directional drill from 8630' to 8848'
113 SPM, 273 GPM, 2510 PSI, 40 RPM, 6 TO ON, 5 TO
OFF,
Cal ECD 10.42, Act ECD 10.52
126K UP, 82K ON, 104K RT WT
AST 2.72, ART 0.16
PROD4 Directional drill from 8848' to 8978'
127K UP, 83K ON, 104K RT WT, 6 TO ON, 5 TO OFF
113 SPM, 273 GPM, 5 - 20 WOB, 2520 PSI ON, 2430 PSI
OFF,
AST 2.9, ART 1.1
At 8978' wellbore crossed fault, consult with Anchorage
geology team, decision to steer wellbore up to locate shales for
drilling TVD
Directional drill from 8978' to 9378', Steer well bore to 99
degrees high side, rotate out, drill ahead as per geology
instructions,
Circulate wellbore, consult with Anchorage geology team: Did
not intend to cross 50' throw fault in this location in the polygon.
Had to discuss polygon development options prior to
proceeding.
PROD4 Trip out from 9378' to 8715', 150K UP, 73K ON
PROD4 Start trenching from 8715' to 8733', 160 degree left, 113 SPM,
280 GPM, 2440 PSI
PROD4 Directional drill from 8733' to 9191', 113 SPM, 280 GPM,
2620 PSI ON, 2560 PSI OFF, 40 RPM
144K UP, 69K ON, 101 RT, Cal ECD 10.66, Act ECD 11.15,
AST 4.17, ART 0.13
PROD4 Directional drill from 9191' to 9378' MD as per new geological
prognosis.
PROD4 Directional drill from 9378' to 9486'
2720 PSI ON, 2540 PSI OFF, 6.7 TO ON, 6.1 TO OFF, 5-
8K WOB
142K UP, 82K DN, 100K RT, Cal ECD 10.83, Act ECD
11.22
PROD4 Circulate wellbore, consult with Anchorage geology team
PROD4 Directional drill from 9486' to 9860' TO for L3
Date From - To Hours Task Code NPT
4/24/2004 00:00 - 03:00 3.00 DRILL P PROD4
03:00 - 04:00 1.00 DRILL N DFAL PROD4
04:00 - 12:00
8.00 DRILL P
12:00 - 17:00
5.00 DRILL P
17:00 - 18:30
1.50 DRILL P
18:30 - 00:00
5.50 DRILL P
4/25/2004
00:00 - 02:30
2.50 DRILL P
02:30 - 03:00 0.50 DRILL P PROD4
03:00 - 05:30 2.50 DRILL C PROD4
05:30 - 13:30 8.00 DRILL C PROD4
13:30 - 14:30
14:30 - 15:00
1.00 DRILL C
0.50 DRILL C
15:00 - 00:00
9.00 DRILL C
4/26/2004
00:00 - 02:30
2.50 DRILL C
02:30 - 04:00
1.50 DRILL P
04:00 - 05:00
05:00 - 09:00
1.00 DRILL P
4.00 DRILL P
Printed: 5/312004 8:46:01 AM
)
)
'SPEXPLQffiATION
o p·øt'~.~.i..øn~.·.·..S·.y.m,ro:ª.ry·..[B·~'Rº·r~·'·'·':
Circulate at 280 gpm, with 100 RPM for max well bore
cleaning, calculated ECD 10.87, drop actual ECD to 11.17,0.3
ppg over calculated
Wiper trip, monitor wellbore, pull 5 stands, pump dry job, 143k
UP, 84K DN, trip to window, pull15K over at 8940,8845,
8225,8585, wipe clean, ok, pull20K over at 8758,8565, pump
125 GPM with 40 RPM, wipe clean, ok
Rig service, service top drive
Orient high side, slide through window with no pump, trip in to
8680', orient 145 left, slide through open hole side track, trip in
to 9845', pick up single and wash to bottom at 9860'
Circulate to lower ECD and clean wellbore, drop actual ecd
from 11.87 to 11.05, 0.2 over calculated of 10.89 ppg
113 SPM, 280 GPM, 2610 PSI, 100 RPM,
Trip out, monitor well bore, puliS stands, 143K UP, 84K DN,
pump dry job, trip out
Trip out of well bore to place circulating sub at window,
well bore in good condition, no wiping during trip
Orient to 14 deg LHS. Drop Circ-Sub opening ball, Pump at
450 GPM, 2320 PSI, wash whipstock twice, 50 % increase in
cuttings at shakers during first bottoms up, 4 bottoms up to
clean casing,
Flow check. Well static. Pump slug.
Continue POOH to top of BHA.
SAFETY--- Held PJSM with rig crew & Anadrill personnel
regarding removing the RA Source & UD BHA.
Remove RA Source. UD all Anadrill Directional tools & bit.
Clear & clean rig floor.
SAFETY--- Held PJSM with rig crew, Anadrill & Baker
personnel regarding M/U Whipstock retrieving tool (WSRT) &
BHA.
M/U WSRT & BHA which consists of the following: Whipstock
Hook retrieving tool + 1 Jt of 3.5" HWDP + FS + MWD +
Bumper-Sub + Oil Jar + 12 x 4-3/4" DC + XO + 24 x 4" HWDP
= 1199.63'. Shallow test MWD-OK.
COMP TIH with WSRT BHA on 4" DP to 5975'.
COMP M/U TDS. Break circulation. Stage pumps to 280 gpm w/1675
psi. Orient WSRT to 14 deg LHS. (P/U Wt 130k S/O Wt 94k).
Slack off on drill string to 6030'. P/U & engage whipstock.
Pull on whipstock with 60k overpull, no release. Jar on
whipstock 1 time with 95k over pull & release whipstock. P/U &
pull seals out of L2 tie-back receptacle. Pull whipstock up to
6000' (P/U Wt = 136k). Monitor well 5 minutes. Annulus level
fell +/- 3D'. Fill hole with 8 bbl of mud.
COMP POOH 5 stds. Pump slug. Continue POOH with whipstock
assembly #3 to top of BHA.
COMP Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock
retrieving tool, L3 Whipstock & 3.5" DP space-out assembly.
100% recovery of all Whipstock & downhole tools. Clear &
clean rig floor.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
~ '..
Houts Task Code NPT phase
4/26/2004 05:00 - 09:00 4.00 DRILL P PROD4
09:00 - 12:30 3.50 DRILL P PROD4
12:30 - 17:00 4.50 DRILL P PROD4
17:00 - 17:30 0.50 DRILL P PROD4
17:30 - 20:30 3.00 DRILL P PROD4
20:30 - 22:30 2.00 DRILL P PROD4
22:30 - 00:00 1.50 DRILL P PROD4
4/27/2004 00:00 - 02:00 2.00 DRILL P PROD4
02:00 . 03:30 1.50 DRI LL P PROD4
03:30 - 04:00 0.50 DRILL P PROD4
04:00 - 06:00 2.00 DRILL P PROD4
06:00 - 06:30 0.50 DRILL P PROD4
06:30 - 08:00 1.50 DRILL P PROD4
08:00 - 08:30 0.50 DRILL P PROD4
08:30 - 09:00 0.50 STWHIP P COMP
09:00 - 10:30 1.50 STWHIP P COMP
10:30 - 13:00
13:00 - 13:30
2.50 STWHIP P
0.50 STWHIP P
13:30 - 17:00
3.50 STWHIP P
17:00 - 19:30
2.50 STWHIP P
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
" ...',:., " .: ;", ',"'" "."""'''' ,
...'.'."....":.:..' ""', ,,,,. ",,,,,,. ,.."",."..,.....,...",. .,' ',"
,. Óescriptionof Oþérðtions
7.5 TO ON, 7.0 TO OFF,S -10K WOB,
Cal ECD 10.90, Act ECD 11.43
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Operati QnsSul11m aryReport
Page 32 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L -201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
DatE} From· - To, Hours Task Code NPT Phase Description· of Operations
4/27/2004 19:30 - 20:30 1.00 CASE P COMP Rig up Hydraulic Casing Tongs & related equipment to run 4.5"
Slotted Production Liner.
20:30 - 21 :45 1.25 CASE P COMP SAFETY --- Held PJSM with rig crew & Baker Service Reps on
running 4.5" Liner & M/U Hook-Hanger assembly.
21 :45 - 00:00 2.25 CASE P COMP M/U 4-1/2" Float Shoe (Bent) Jt + 87 Jts of 4-1/2" 12.6#, L-80,
I BT -M slotted liner to 3672'.
M/U Torque = 3200 FtLb
4/28/2004 00:00 - 00:30 0.50 CASE P COMP Finish M/U 4-1/2" Float Shoe (Bent) Jt + 89 Jts of 4-1/2" 12.6#,
L-80, IBT-M slotted liner + 1 Jt of solid liner + XO Pup Jt & BOT
Flanged Hook Hanger assembly. Total length = 3825.29'
M/U Torque = 3200 FtLb
P/U Wt = 72k --S/O Wt = 60k-- Theoretical Liner Wt in mud =
41,500 Lbs
00:30 - 01 :00 0.50 CASE P COMP Change elevators to fit 4" DP. RID Hydraulic Casing Tongs &
related equipment.
01 :00 - 02:15 1.25 CASE P COMP Continue RIH with 4-1/2" slotted liner on 25 Stds of 4" DP. Tag
up @ 6184' on L2 L TP.
P/U 105k S/O 80k
02:15 - 02:45 0.50 CASE P COMP POOH to 6020'. Apply 1/4 RH turn in string. Reciprocate string
to relax torque. TIH with the 4-1/2" slotted liner. Tag up @
6184'. POOH to 6020'. Apply another 1/4 turn. TIH successfully
entering the L3 lateral @ 6037".
02:45 - 04:45 2.00 CASE P COMP Continue TIH. Tag up @ 9380' indicating that the 4.5" Liner did
not enter the open hole sidetrack in the L3 lateral @ 8715'.
Original hole hole depth 9378'.
04:45 - 06:30 1.75 CASE P COMP POOH to 8700'. Apply 1/2 turn to right while pick up. TIH
successfully entering the open hole sidetrack in the L3 lateral
@ 8715'. Conitinue TIH to 9845'. Engage hook hanger on
bottom of window @ 6037' on first attempt.
06:30 - 08:00 1.50 CASE P COMP PU 10' above window and rotate string 1/2 turn. Slack-off and
run Hook-Hanger 10' below btm of window - OK. P/U string with
Hook-Hanger 10' above window. Re-orient hook hanger and
Land out with Hook-Hanger on bottom of window @ 6037-0K.
P/U Wt = 150k SIO Wt = 85k, Set down 20k on top of hanger.
Shoe at 9845'. Top of hook hanger at 6020'.
Drop 29/32" ball & pump on seat. Pressure up to 3000 psi to
release HWH Running tool. P/U Drill string 10' & verify HWH
Running tool released. Lost 37k string wt. Set back down & tag
Hook-Hanger with 25k-OK. P/U on string with Running Tool
above Hook-Hanger. RlU Side Entry Pump-in sub into the 4"
DP. Pressure up to 4900 psi & blow ball seat. RID pump-in
sub. M/U TDS.
08:00 - 09:30 1.50 CASE P CaMP P/U on string placing end of DP @ 6000'. CBU @ 6 bpm wI
1100 psi. Flow check. Pump slug.
09:30 - 12:30 3.00 CASE P COMP POOH with 4" DP. UD Baker's Liner Running Tool.
12:30 - 13:00 0.50 CASE P COMP RlU Handling tools for LEM.
13:00 - 13:30 0.50 CASE P COMP SAFETY--- Held PJ8M with rig crew & Baker on picking up &
running LEM assembly.
13:30 - 18:30 5.00 CASE P COMP P/U ZXP Packer/LEM assembly. TIH with same on 4" DP to
6006'.
P/U 134k 8/0 93k
Printed: 5/312004 8:46:01 AM
)
')
·...:.~F:»gXR4-Qg.A17Iç:>N .
Operati()ns Summary RE!port
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
'Date Froni- To Hours Task Code NPT . Phase
4/28/2004 18:30 - 20:00 1.50 CASE P COMP
20:00 - 20:30 0.50 CASE P COMP
20:30 - 21 :00
0.50 CASE P
COMP
21 :00 - 23:00
2.00 CASE P
COMP
23:00 - 00:00 1.00 CASE P CaMP
4/29/2004 00:00 - 01 :00 1.00 CASE P CaMP
01 :00 - 01 :30 0.50 CASE P CaMP
01 :30 - 06:30 5.00 CASE P COMP
06:30 - 08:30 2.00 CASE P COMP
08:30 - 14:00 5.50 CASE P CaMP
14:00 - 14:30 0.50 WHSUR P COMP
14:30 - 16:00 1.50 WHSUR P CaMP
16:00 - 16:30 0.50 RUNCO~ COMP
16:30 - 00:00 7.50 RUNCO~ COMP
4/30/2004
3.00 RUNCO~
COMP
00:00 - 03:00
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
::......,..;.:-' ," ..'.",', ' ,,;."".'.:: ,'.,'.:":"':':;':-:".,:':'·':::"::';':"'.,i·'.:::::,;::'.,;.:"'.'.'
. ,,' '.'" '''.' . ','"'''' '."".....,'.,..'. ',"" "..,-".'.
[jescriptiÒnöf0pér~ti&hs:' .
Continue RIH. Sting seal assembly into Seal Bore Extension @
6196' & Land LEM in Hook-Hanger @ 6020'. P/U 10k over
string weight to verify LEM engaged-OK.
Drop the 29/32" setting ball and pump on seat @ 164 gpm w/
680 psi. Pressure up to 2500 psi, wait 2 minutes, then
increased pressure to 4000. P/U on string. Packer Setting tool
free. P/U 10' & position the rotating Dog Sub above the ZXP
Tie-back sleeve. Rotate string at 10 rpm. Slack off on string &
set down 50klbs on ZXP Packer. P/U 15'. R/U & blow ball seat
with 5075 psi.
NOTE: Top of ML3M ZXP Packer @ 5981' MDRKB.
P/U on string & place LEM Running tool @ 5980'. CBU with
346 GPM @ 1760 PSI.
Displace well to 9.3 ppg brine from 5980'.
Pumped the following sweeps:
25 bbls L VT -200 base oil
25 bbls viscosified 9.3 ppg brine
50 bbls 9.3 ppg brine with 4 drums Safe Surf 0
25 bbls viscosified 9.3 ppg brine
Follow the sweeps with 290 bbls 9.3 ppg brine until clean
returns. 430 gpm, 2025 psi.
Note: 170 bbls Versacoat left in hole.
Load MOBM on trucks. Clean MOBM from rotary table, sumps,
shakers, pits & mud return line.
Finish cleaning pits & surface equipment of MOBM.
Service TDS.
POOH. Lay down 150 Jts of 4" DP + 12 x 4.75" DC & BOT
LEM Running Tool.
TIH with 8 Std of 4" HWDP + 50 Std of 4" DP from derrick to
5407'
POOH. UD 150 Jts of 4" DP + 24 Jts of 4" HWDP. Clear rig
floor of excess drilling equipment.
Flush BOP Stack. Pull wear bushing.
R/U 4.5" tbg running equipment. R/U control line spool & hang
sheave for running I-wire. P/U tbg hanger & make dummy run.
UD same.
SAFETY--- Held PJSM with BOT, Centrilift, Camco, Nabors
Casing and all rig personnel on making up and running
completion string.
Run 75 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing
with jewelry as per running orders. M/U and run I-wire for
Phoenix pressure sensor. Check sensor and I-wire every 1000'
of tbg run. Install 1 control line clamp per tbg joint for the 1 st 10
joints, then 1 clamp every 2 joints. Midnight depth = 3361'.
Finish running 4.5" Production String from 3361'. Ran a total of
136 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with
jewelry as per running orders. Check sensor and I-wire every
1000'. Install 1 control line clamp per tbg joint for the 1 st 10
joints, then 1 clamp every 2 joints to surface - 75 total clamps
run.
Printed: 51312004 8:46:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Page 34 of 34
BP EXPLORATION
Operations Summary Reporj
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
4/30/2004
03:00 - 05:00
From - To Hours Task Code NPT Phase
Description..of Operatior¡s ..
Date
05:00 - 07:00
07:00 - 09:00
2.00 RUNCOtvP
COMP
2.00 RUNCOtvP
COMP
2.00 RUNCOtvP
COMP
09:00 - 09:30 0.50 RUNCOtvP COMP
09:30 - 12:00 2.50 BOPSUP P COMP
12:00 - 15:00 3.00 WHSUR P COMP
15:00 - 16:00 1.00 WHSUR P COMP
16:00 - 19:30 3.50 WHSUR P COMP
19:30 - 20:00
20:00 - 21 :00
21 :00 - 22:00
0.50 WHSUR P
COMP
1.00 WHSUR P
1.00 WHSUR P
CaMP
CaMP
Tag up on NO-GO @ 6001'. M/U space out pups. Run I-wire
through hanger & secure. Shell test Tubing Hanger to 5000
psi-OK. Land Tubing Hanger in wellhead. Space out tbg 2'
above NO-GO placing the mule shoe at 5999'. RILDS and test
I-wire-OK.
Reverse circulate 94 bbls clean brine followed by 3 bbls
corrosion inhibited brine, followed by 158 bbls clean brine.
Placing corrosion inhibited brine between packer and lower
GLM. 3 bpm @ 150 psi.
Drop 1-7/8" ball-rod & let gravitate on seat. Pressure up tubing
to 4500 psi to set packer. Bleed pressure to 3500 psi and hold
for 30 minutes for tbg test. Bleed tbg pressure to 2500 psi and
pressure up annulus to 3500 psi, hold for 30 minute for annular
and packer test. Bleed both tbg and annulus pressure to 0 psi.
Pressure up annulus, DCK valve sheared at 3000 psi. Circulate
through the tubing to ensure DCK was open.
UD 4.5" tubing landing joint. Install TWCV.
UD Mouse Hole, pull Bell-nipple. N/D BOP_
N/U FMC 11" 5K x 4-1/16" 5K Tubing head adapter. Terminate
I-Wire through adapter flange. N/U 4-1/16" 5K Production Tree.
Test tubing head adapter & tree to 5000 psi. Test was API.
R/U DSM lubricator. Pull TWCV.
Held PJSM with Rig Crew & Little Red Hot Oil Service rep
regarding freeze protecting operations. R/U Hot Oil & test lines
to 2000 psi. Freeze protect 4.5" x 7 5/8" annulus. Reverse
circulate 150 bbl of diesel down 4.5" x 7 5/8" annulus @ 2 bpm
with 1250 psi. Let well U-Tube & equalize.
DSM install BPV in Tubing Hanger. Test to 1000 psi form
below.
RID Hot Oil Line. DSM install VR Plugs in Tubing Spool outlets.
Install needle valves & gauges on wellhead wing valve outlets.
Secure well. Clean up cellar area.
Release Rig @ 22:00 Hrs April 30, 2004
Printed: 5/312004 8:46:01 AM
) )
bp
C L-201 L2 Survey Report Schlumberger
Report Data: Apri1190, 2004 Survey / DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 130.000·
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure / Slot: L-PAD/N-U TVD Reference Datum: Rotary Table
Well: L-201 TVD Reference Elevation: 78,70 ft relative to MSL
Borehole: L-201 L2 Sea Bed I Ground Level Elevation: 50.20 ft relative to MSL
UWI/API#: 500292320261 Magnetic Declination: 24,991·
Survey Name / Data: L-201 L2/ April 19, 2004 Total Field Strength: 57561,951 nT
Tort / AHD / DDII ERD ratio: 454.461< /11157.34 ft /7,170/2.413 Magnetic Dip: 80.823·
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 20, 2004
Location LatlLong: N 70.35073717, W 149.32347531 Magnetic Declination Model: BGGM 2003
Location Grid N/E Y/X: N 5978320.840 ftUS, E 583325.340 ftUS North Reference: True North
Grid Convergence Angle: +0.63713312· Total Corr Mag North -> True North: +24,991·
Grid Scale Factor: 0.99990789 Local Coordinates Referenced To: Well Head
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/100 ft ) (ftUS) (ftUS)
0,00 0.00 0,00 -78.70 0,00 0.00 0,00 0.00 0.00 0.00 0,00 0,00 5978320,84 583325,34 N 70,35073717 W 149,32347531
124,00 0,22 237.38 45,30 124.00 -0.07 0.24 -0,13 -0,20 0.18 0.18 0,00 5978320.71 583325.14 N 70,35073682 W 149,32347694
224,00 0.52 340,14 145,30 224.00 -0,52 0.75 0,19 -0,52 0.61 0,30 102,76 5978321.03 583324,82 N 70,35073770 W 149.32347951
324,00 2,13 19.40 245,27 323.97 -1.57 3,00 2,37 -0,05 1.76 1.61 39,26 5978323,21 583325.26 N 70.35074366 W 149,32347575
395,00 4.15 21,01 316,16 394,86 -2,87 6,89 6,02 1.31 2,85 2.85 2.27 5978326,87 583326.58 N 70,35075361 W 149,32346471
495,00 5,88 17.19 415.77 494.47 -6,03 15.63 14,29 4.12 1,76 1,73 -3,82 5978335,17 583329,30 N 70.35077621 W 149.32344189
595.00 8,86 11.46 514.94 593.64 -11.70 28.45 26,73 7,16 3,07 2,98 -5.73 5978347.65 583332.20 N 70,35081020 W 149,32341717
695,00 11.87 12.48 613,29 691,99 -20,13 46.44 44,33 10.92 3,02 3,01 1.02 5978365,28 583335,76 N 70.35085827 W 149.32338670
758.99 14.48 14,62 675.59 754.29 -26,60 61.02 58,50 14.36 4.15 4,08 3.34 5978379.49 583339.05 N 70.35089697 W 149,32335876
853,05 17.37 16.52 766.04 844,74 -37,24 86.82 83,34 21.32 3,12 3.07 2.02 5978404.41 583345,73 N 70,35096485 W 149,32330224
947.46 19.62 16.37 855.56 934,26 -49,21 116,77 112.06 29.80 2,38 2.38 -0.16 5978433,22 583353.88 N 70,35104332 W 149.32323343
1040,82 22,84 16,89 942,58 1021.28 -62,61 150,57 144.45 39.48 3.45 3.45 0,56 5978465,71 583363,21 N 70.35113179 W 149,32315481
1132,91 25.75 16.87 1026,50 1105,20 -77.48 188.45 180.70 50.48 3,16 3.16 -0,02 5978502.07 583373,80 N 70,35123083 W 149.32306550
1226.13 27,99 17.46 1109,65 1188.35 -93,82 230,58 220,95 62.92 2.42 2.40 0,63 5978542.46 583385.79 N 70.35134079 W 149.32296450
1321.50 29.42 18,07 1193.30 1272,00 -111.15 276,39 264.57 76,90 1,53 1.50 0,64 5978586,22 583399.29 N 70,35145995 W 149,32285099
1416.81 31.11 18,21 1275.62 1354.32 -129,04 324.42 310.22 91,86 1.77 1,77 0.15 5978632.03 583413.74 N 70,35158465 W 149,32272956
1511,08 32,79 18,97 1355.60 1434.30 -147,24 374,31 357.49 107.77 1.83 1,78 0,81 5978679.48 583429.12 N 70,35171381 W 149.32260040
1604,81 34.13 19,21 1433.80 1512.50 -165,68 425,98 406,33 124,67 1.44 1.43 0.26 5978728.49 583445.47 N 70,35184722 W 149.32246316
1699,54 33,73 19.32 1512.40 1591,10 -184.40 478.86 456,24 142.12 0.43 -0.42 0.12 5978778.59 583462,36 N 70,35198358 W 149.32232152
1797,56 36.27 18,62 1592,68 1671,38 -204,58 535,08 509.41 160.38 2.62 2.59 -0,71 5978831,96 583480,03 N 70,35212883 W 149.32217323
1892,80 37.18 18,91 1669.02 1747.72 -225,21 592,03 563.33 178.70 0.97 0.96 0.30 5978886,07 583497,75 N 70,35227614 W 149.32202448
1988.07 39.87 19.15 1743,55 1822,25 -246.44 651,36 619.42 198.05 2.83 2,82 0,25 5978942,37 583516,48 N 70,35242937 W 149,32186737
2081.93 41.57 20,11 1814.68 1893.38 -267,74 712,59 677.09 218,63 1,93 1,81 1,02 5979000,26 583536.41 N 70.35258691 W 149,32170029
2175.78 42,75 19.75 1884,25 1962.95 -289,36 775,58 736,31 240.10 1,28 1.26 -0,38 5979059,70 583557,22 N 70,35274869 W 149,32152597
2269,96 45.03 20.88 1952.12 2030.82 -311,34 840,87 797,53 262,78 2.56 2.42 1,20 5979121.17 583579,21 N 70.35291593 W 149.32134182
2361,74 45.50 21.16 2016,71 2095.41 -332,55 906,07 858,39 286,17 0.56 0,51 0,31 5979182.28 583601,92 N 70.35308219 W 149.32115193
2458.33 47.95 21.23 2082,92 2161,62 -355,21 976,38 923,95 311.59 2.54 2.54 0,07 5979248.11 583626,61 N 70,35326130 W 149.32094549
2552,24 48.94 21.51 2145.22 2223,92 -377,66 1046,66 989,39 337,20 1.08 1.05 0,30 5979313,83 583651.48 N 70.35344008 W 149.32073755
2645,64 49.74 21,45 2206.07 2284.77 -400,17 1117.51 1055,32 363.14 0.86 0.86 -0,06 5979380,04 583676.69 N 70.35362019 W 149.32052688
2740,10 50,69 21.63 2266.52 2345,22 -423,15 1190.10 1122,84 389,79 1,02 1.01 0,19 5979447,84 583702.59 N 70.35380464 W 149,32031046
2834,26 50,10 21.09 2326.54 2405,24 -446,34 1262.64 1190.40 416,22 0.77 -0,63 -0,57 5979515,68 583728,26 N 70,35398921 W 149,32009588
2928.38 49.29 22,08 2387.43 2466,13 -469,01 1334.42 1257,15 442,62 1.18 -0.86 1,05 5979582,71 583753.91 N 70.35417154 W 149.31988149
3022,90 49,04 23.22 2449.23 2527,93 -490,34 1405.93 1323,14 470,16 0,95 -0,26 1.21 5979649.00 583780.71 N 70.35435183 W 149,31965786
3117.47 48.89 23.30 2511,32 2590,02 -510,89 1477,27 1388,68 498,33 0,17 -0.16 0,08 5979714,84 583808,15 N 70,35453086 W 149,31942910
3152,16 49.11 23,20 2534,08 2612,78 -518.43 1503.45 1412,73 508,66 0,67 0,63 -0,29 5979739.01 583818,21 N 70.35459658 W 149.31934517
3266,50 47.43 25,10 2610,19 2688.89 -541.75 1588.77 1490,59 543.55 1,92 -1.47 1.66 5979817,25 583852.23 N 70.35480928 W 149,31906183
3325,61 49,36 23,06 2649.43 2728,13 -553,88 1632,97 1530,95 561,57 4,16 3,27 -3.45 5979857,79 583869.80 N 70,35491951 W 149,31891549
3420,36 50,09 23,79 2710,69 2789.39 -574.50 1705.25 1597,27 590,31 0,97 0.77 0.77 5979924.43 583897,80 N 70.35510071 W 149,31868208
3515,35 49,54 23,70 2771.98 2850,68 -594,82 1777. 82 1663,70 619,53 0,58 -0.58 -0.09 5979991.17 583926,28 N 70,35528217 W 149,31844476
3609,16 49,34 23.32 2832,98 2911,68 -615.05 1849,09 1729,05 647,96 0,37 -0,21 -0.41 5980056.83 583953,98 N 70.35546071 W 149,31821387
3701,35 50,03 21,52 2892,63 2971,33 -636,28 1919,38 1794,03 674.77 1,67 0,75 -1,95 5980122.09 583980,05 N 70.35563821 W 149,31799618
3794,96 50,31 21,39 2952,59 3031.29 -659,14 1991,27 1860.94 701,06 0.32 0,30 -0.14 5980189.28 584005,60 N 70.35582099 W 149.31778262
3888,81 50,23 21,33 3012,57 3091,27 -682.21 2063.45 1928,16 727.35 0,10 -0,09 -0,06 5980256,78 584031,14 N 70,35600462 W 149,31756910
3982,46 49,83 20,65 3072. 73 3151.43 -705,59 2135,22 1995.16 753,06 0.70 -0.43 -0.73 5980324.07 584056.10 N 70,35618767 W 149,31736028
4076.83 49,57 20,57 3133.77 3212.47 -729.49 2207.19 2062,53 778,39 0,28 -0,28 -0,08 5980391,70 584080,68 N 70.35637170 W 149,31715449
4172.21 49,68 19,90 3195,56 3274,26 -754,06 2279.86 2130,71 803,52 0,55 0,12 -0,70 5980460,15 584105,05 N 70,35655795 W 149,31695036
4266.06 48,39 21,00 3257.08 3335,78 -777,78 2350,72 2197,11 828,28 1.63 -1,37 1,17 5980526.82 584129.06 N 70,35673934 W 149,31674930
4360,01 47,90 21.14 3319.77 3398,47 -800.48 2420,70 2262.41 853.43 0,53 -0,52 0,15 5980592,38 584153.49 N 70.35691772 W 149,31654495
4454.28 47,80 22,75 3383,03 3461,73 -822,14 2490,59 2327,23 879.55 1,27 -0,11 1,71 5980657.49 584178,88 N 70,35709480 W 149,31633280
4548,11 48,18 26,94 3445,85 3524,55 -840.35 2560.29 2390.47 908,84 3,34 0.40 4.47 5980721.04 584207.46 N 70.35726755 W 149,31609491
4641,89 48,96 31,87 3507,92 3586,62 -853,25 2630.58 2451,68 943,36 4,03 0,83 5,26 5980782,62 584241,29 N 70.35743475 W 149.31581454
4735.40 48,79 36.31 3569.44 3648,14 -860,51 2701,01 2509.98 982,82 3,58 -0,18 4.75 5980841.36 584280,1 ° N 70,35759404 W 149,31549403
4829,57 48,97 40,88 3631,39 3710,09 -862,24 2771.93 2565.40 1027,05 3.66 0,19 4,85 5980897,26 584323,71 N 70.35774541 W 149.31513475
4923.41 48.83 47,15 3693.11 3771,81 -857,30 2842,62 2616,21 1076,14 5,04 -0,15 6,68 5980948.61 584372.22 N 70,35788420 W 149.31473606
SurveyEditor Ver 3,1 RT -SP3,03-HF4.00 Bld( do31 rt-546 )
N-U\L-201\L-201 L2\L-201 L2
Generated 5/5/2004 1 :01 PM Page 1 of 5
) )
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft) (ft ) ( deg/1 00 ft ) ( deg/100 ft ) ( deg/100 ft ) (ftUS) (ftUS)
5016.44 49,09 54,19 3754,24 3832,94 -844,31 2912,75 2660,62 1130,36 5.71 0,28 7,57 5980993,62 584425,94 N 70,35800551 W 149,31429571
5110,60 48,23 58,33 3816.45 3895,15 -824,54 2983.43 2699,89 1189.11 3.42 -0,91 4.40 5981033,53 584484,25 N 70,35811275 W 149,31381851
5204,87 49.16 62.86 3878.69 3957,39 -799.63 3054,23 2734,62 1250,78 3,74 0.99 4,81 5981068,94 584545,52 N 70,35820761 W 149,31331763
5298,92 47.75 68.46 3941,09 4019,79 -769,20 3124,59 2763,65 1314.85 4,70 -1,50 5,95 5981098.67 584609.26 N 70,35828687 W 149,31279728
5392,93 49.39 73.49 4003.32 4082,02 -732,92 3195,05 2786,57 1381.46 4,37 1,74 5,35 5981122,34 584675,60 N 70,35834947 W 149,31225633
5487,16 51.11 80,03 4063,61 4142.31 -689,56 3267.47 2803.10 1451,92 5,64 1,83 6,94 5981139,64 584745,86 N 70,35839458 W 149,31168408
5582,88 53.94 84,88 4121,86 4200,56 -638,27 3343.41 2813.00 1527,19 4.99 2.96 5,07 5981150.39 584821,01 N 70,35842161 W 149,31107280
5677.97 56.15 89.22 4176.36 4255,06 -581.23 3421,33 2816,97 1604,99 4,40 2,32 4,56 5981155.22 584898.75 N 70,35843241 W 149.31044097
5769,98 58.26 91,53 4226,20 4304,90 -521.65 3498,66 2816.45 1682,32 3,12 2,29 2,51 5981155.56 584976,08 N 70,35843093 W 149,30981296
5862,16 59.02 94,81 4274,18 4352,88 -458.65 3577.37 2812,09 1760.89 3,15 0,82 3.56 5981152.07 585054.69 N 70,35841896 W 149,30917484
5955.46 61.37 98.97 4320,56 4399,26 -390.85 3658,32 2802,35 1841.23 4,62 2.52 4.46 5981143,22 585135,12 N 70.35839229 W 149.30852243
6049,62 64.61 102.59 4363,33 4442,03 -317.64 3742,19 2786.62 1923.60 4,85 3.44 3,84 5981128.42 585217,66 N 70,35834929 W 149,30785351
6143,03 65,95 107,59 4402.41 4481,11 -240,71 3827.03 2764,52 2005.48 5,07 1.43 5,35 5981107,23 585299,77 N 70,35828886 W 149,30718859
6229,00 68.41 110.67 4435,76 4514,46 -166,68 3906,26 2738,54 2080,33 4,37 2,86 3.58 5981082.09 585374.89 N 70,35821782 W 149,30658085
6241.00 70,32 110.46 4439.99 4518,69 -156,09 3917.49 2734,60 2090.84 16.00 15,92 -1,75 5981078,26 585385.45 N 70.35820704 W 149,30649547
6248,82 70,86 110,87 4442,59 4521,29 -149,13 3924,86 2732,00 2097,74 8.49 6.91 5,24 5981075.74 585392,38 N 70.35819992 W 149.30643944
6280,05 74,34 112.47 4451,93 4530.63 -120,85 3954,66 2720.99 2125.43 12.17 11,14 5.12 5981065,04 585420,18 N 70,35816984 W 149.30621461
6311,72 78.37 114,05 4459.40 4538,10 -91,38 3985.43 2708,84 2153.69 13,62 12.72 4.99 5981053,20 585448,58 N 70.35813661 W 149.30598508
6342,77 82.86 115,55 4464.46 4543.16 -61.83 4016.06 2695,99 2181.49 15.23 14.46 4.83 5981040,66 585476,52 N 70.35810149 W 149.30575935
6373,77 87.77 117,02 4466,99 4545,69 -31,82 4046,94 2682,31 2209.19 16,53 15.84 4,74 5981027,30 585504.36 N 70,35806410 W 149,30553449
6404.96 91.54 118.49 4467,18 4545,88 -1,35 4078,13 2667.79 2236.78 12.97 12,09 4.71 5981013,08 585532.11 N 70.35802440 W 149,30531043
6436.66 93.43 119.98 4465,80 4544.50 29,76 4109.80 2652.32 2264.42 7,59 5,96 4.70 5980997.93 585559,91 N 70,35798213 W 149.30508605
6467,17 92,51 121,35 4464,22 4542,92 59.83 4140,26 2636,78 2290,62 5.40 -3,02 4.49 5980982.68 585586.29 N 70.35793965 W 149,30487326
6498.86 91.78 122.78 4463,04 4541,74 91,19 4171,93 2619.97 2317.46 5.06 -2,30 4.51 5980966.17 585613.31 N 70,35789370 W 149.30465537
6529.76 91,98 122.67 4462.02 4540,72 121.83 4202,82 2603.28 2343.44 0,74 0.65 -0,36 5980949,77 585639.47 N 70,35784807 W 149,30444442
6560.75 91,81 122,83 4461.00 4539,70 152.55 4233,79 2586.52 2369.49 0.75 -0,55 0.52 5980933.30 585665.70 N 70,35780227 W 149.30423291
6591,97 92,70 123,94 4459.77 4538.47 183,54 4264,98 2569,35 2395,54 4.55 2,85 3.56 5980916,43 585691,94 N 70,35775536 W 149,30402142
6622,94 91.47 122.58 4458,64 4537,34 214,27 4295,93 2552,38 2421.42 5,92 -3.97 -4,39 5980899.75 585718,00 N 70,35770896 W 149,30381131
6654,79 88,79 124,93 4458.57 4537,27 245.93 4327,78 2534,69 2447,89 11,19 -8,41 7,38 5980882,35 585744,67 N 70.35766060 W 149,30359635
6685,75 89.62 123.41 4459,00 4537,70 276,72 4358,74 2517,30 2473.51 5,59 2.68 -4,91 5980865.25 585770.47 N 70,35761308 W 149,30338840
6716.49 91,43 125.79 4458,72 4537.42 307,32 4389.47 2499.85 2498,80 9,73 5,89 7.74 5980848,08 585795,96 N 70.35756538 W 149.30318300
6748,09 91.88 125.69 4457,81 4536.51 338,82 4421.06 2481.40 2524.44 1.46 1.42 -0.32 5980829,92 585821 ,80 N 70.35751495 W 149.30297485
6778.86 92.32 125.04 4456,68 4535.38 369.47 4451.81 2463.60 2549.52 2,55 1.43 -2.11 5980812.40 585847,07 N 70.35746631 W 149,30277127
6809,61 91.88 124.18 4455,55 4534,25 400.06 4482,54 2446.15 2574.81 3.14 -1.43 -2,80 5980795,23 585872,55 N 70.35741860 W 149.30256593
6841 .48 91.02 124.41 4454,74 4533.44 431.77 4514.40 2428,20 2601.13 2.79 -2,70 0.72 5980777,58 585899,07 N 70,35736954 W 149,30235224
6872.68 89.75 124,25 4454,53 4533,23 462.81 4545,60 2410.60 2626.89 4.10 -4.07 -0.51 5980760,27 585925,02 N 70,35732144 W 149,30214307
6903.03 90.78 124.72 4454.39 4533,09 493.02 4575,95 2393.42 2651,91 3,73 3.39 1.55 5980743.37 585950.22 N 70,35727448 W 149,30193997
6934.85 90.20 123.00 4454,12 4532,82 524,66 4607.77 2375,69 2678.33 5,70 -1,82 -5.41 5980725.94 585976,84 N 70.35722602 W 149.30172546
6966.15 89.51 123.07 4454,20 4532.90 555,72 4639,07 2358,63 2704.57 2,22 -2,20 0,22 5980709.17 586003.26 N 70,35717938 W 149,30151243
6996,79 90.40 125,50 4454,23 4532,93 586.21 4669,70 2341.37 2729.88 8.45 2,90 7,93 5980692,20 586028.77 N 70.35713221 W 149,30130691
7027,89 90.75 126,05 4453.91 4532,61 617.22 4700.80 2323,19 2755.12 2.10 1.13 1,77 5980674.30 586054,19 N 70,35708252 W 149,30110208
7058.05 90.68 125,62 4453,54 4532,24 647,30 4730.96 2305,53 2779.56 1.44 -0,23 -1,43 5980656.92 586078,84 N 70,35703426 W 149,30090359
7088,89 90,58 125,09 4453,20 4531,90 678,04 4761,80 2287.69 2804.72 1,75 -0,32 -1.72 5980639,36 586104,18 N 70.35698548 W 149.30069940
7120.17 90.71 125,09 4452.85 4531,55 709.20 4793,08 2269,71 2830,31 0.42 0.42 0,00 5980621,66 586129,97 N 70,35693634 W 149,30049163
7151,57 90,95 125,18 4452,39 4531.09 740.49 4824.47 2251.64 2855,98 0,82 0,76 0,29 5980603,88 586155,84 N 70.35688695 W 149.30028318
7182.56 90.82 126,27 4451,91 4530,61 771.38 4855.46 2233,55 2881,14 3.54 -0.42 3,52 5980586.07 586181,20 N 70,35683749 W 149,30007896
7213.70 90.92 125.44 4451.44 4530.14 802.44 4886.60 2215.31 2906,38 2.68 0,32 -2.67 5980568,12 586206,63 N 70,35678764 W 149.29987409
7245.02 90,78 125,96 4450,97 4529.67 833,67 4917,91 2197.03 2931,81 1,72 -0.45 1.66 5980550,13 586232.26 N 70.35673769 W 149.29966763
7276,03 90.51 126.98 4450,63 4529,33 864,62 4948.92 2178.60 2956.74 3.40 -0,87 3.29 5980531,98 586257.40 N 70.35668731 W 149,29946521
7307,25 90,30 125.32 4450.41 4529,11 895.76 4980,14 2160,19 2981,95 5,36 -0.67 -5.32 5980513,85 586282,81 N 70,35663698 W 149,29926057
7338,59 91.50 125,50 4449,91 4528,61 927,00 5011.48 2142,03 3007.49 3.87 3,83 0,57 5980495,98 586308,54 N 70.35658735 W 149,29905324
7369,09 92,94 123.50 4448.73 4527.43 957,33 5041.95 2124.77 3032.60 8.08 4,72 -6,56 5980479,00 586333,85 N 70.35654016 W 149,29884935
7401.26 92,05 121,30 4447,33 4526,03 989.19 5074,09 2107,55 3059,74 7,37 -2.77 -6,84 5980462.08 586361,17 N 70,35649309 W 149,29862906
7431,83 92,81 119,69 4446.03 4524,73 1019,31 5104.63 2092.05 3086,06 5,82 2.49 -5,27 5980446,88 586387,65 N 70,35645072 W 149,29841541
7462,82 92,77 118,64 4444,53 4523,23 1049,71 5135,59 2076,97 3113,08 3.39 -0.13 -3,39 5980432.10 586414,85 N 70,35640948 W 149,29819598
7493,89 92,60 118.24 4443,07 4521,77 1080,12 5166,62 2062.19 3140.37 1.40 -0,55 -1,29 5980417,62 586442,30 N 70,35636907 W 149,29797443
7524,87 92,12 119.42 4441.79 4520.49 1110.48 5197,58 2047.26 3167,49 4,11 -1,55 3.81 5980403,00 586469,57 N 70,35632826 W 149,29775428
7555.40 92,77 119,58 4440.49 4519,19 1140.48 5228,08 2032,24 3194,04 2.19 2,13 0,52 5980388.28 586496,28 N 70,35628720 W 149,29753876
7586,23 92,87 119.27 4438,98 4517,68 1170,75 5258,87 2017,11 3220,86 1,06 0,32 -1,01 5980373,45 586523,27 N 70,35624584 W 149,29732102
7616,72 91,78 119,82 4437,74 4516.44 1200,70 5289,34 2002,09 3247,36 4.00 -3,57 1,80 5980358,73 586549,93 N 70,35620477 W 149,29710586
7648,68 91,50 120,56 4436,82 4515,52 1232.18 5321,28 1986,03 3274,98 2.47 -0,88 2,32 5980342,97 586577,72 N 70,35616085 W 149,29688169
7678,75 91,30 118.58 4436,09 4514,79 1261,75 5351,34 1971,19 3301.12 6,62 -0,67 -6,58 5980328.43 586604,03 N 70,35612029 W 149,29666945
7710,19 89,75 116,02 4435,80 4514.50 1292.41 5382.78 1956.77 3329,05 9.52 -4.93 -8,14 5980314,32 586632,12 N 70,35608087 W 149.29644267
7740,23 89,07 115.88 4436,11 4514,81 1321,55 5412,82 1943.63 3356,06 2,31 -2,26 -0.47 5980301.48 586659,27 N 70.35604493 W 149.29622339
7770,76 89.10 114,78 4436.60 4515,30 1351,08 5443.35 1930,57 3383,65 3.60 0,10 -3,60 5980288.73 586687,00 N 70,35600922 W 149,29599940
7801.46 89.44 113,27 4436,99 4515,69 1380,59 5474,04 1918,07 3411,69 5,04 1,11 -4.92 5980276,55 586715.17 N 70,35597504 W 149,29577178
7832,24 89,51 112,57 4437,27 4515.97 1410.02 5504,82 1906,09 3440,04 2,29 0,23 -2.27 5980264,88 586743,65 N 70,35594226 W 149.29554162
7863,07 88,52 112.49 4437,80 4516.50 1439,42 5535,65 1894,28 3468,51 3.22 -3,21 -0,26 5980253,39 586772.25 N 70.35590996 W 149,29531047
7893,97 88.17 111,13 4438,69 4517,39 1468,76 5566,53 1882,80 3497,19 4,54 -1,13 -4.40 5980242,23 586801.05 N 70,35587857 W 149,29507766
7924,35 87,80 111,31 4439.76 4518.46 1497,51 5596.89 1871,81 3525.49 1.35 -1,22 0,59 5980231,56 586829.47 N 70.35584851 W 149,29484788
7954,78 88.62 112.43 4440,71 4519.41 1526.41 5627,31 1860.48 3553,72 4,56 2,69 3,68 5980220,54 586857,82 N 70,35581752 W 149,29461874
SurveyEditor Ver 3,1 RT -SP3,03-HF4,OO Bld( do31 rt-546 )
N-U\L-201 \L-201 L2\L-201 L2
Generated 5/5/2004 1 :01 PM Page 2 of 5
) ')
Measured Inclination Azimuth Sub-Sea TVO TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) (deg/100 ft) ( deg/100 ft) ( deg/100 ft ) (ftUS) (ftUS)
7985.18 89.17 112.51 4441,30 4520,00 1555,39 5657,70 1848,86 3581,80 1,83 1.81 0.26 5980209,24 586886,03 N 70,35578575 W 149.29439071
8015.88 89,51 113,01 4441,65 4520,35 1584,71 5688.40 1836,99 3610,11 1,97 1,11 1.63 5980197,68 586914.46 N 70,35575327 W 149,29416090
8046,12 89.51 112,14 4441,91 4520,61 1613,56 5718,64 1825,38 3638,03 2,88 0,00 -2,88 5980186,39 586942,51 N 70,35572152 W 149.29393422
8077,32 89,51 113,36 4442,18 4520,88 1643,36 5749,84 1813,32 3666.80 3,91 0,00 3.91 5980174.64 586971.41 N 70,35568852 W 149,29370064
8107,85 88.76 110,70 4442.64 4521.34 1672.39 5780,37 1801,87 3695,10 9,05 -2.46 -8,71 5980163,51 586999,83 N 70,35565721 W 149,29347093
8137,95 88,35 109,61 4443.40 4522,10 1700,70 5810.46 1791.50 3723.35 3,87 -1,36 -3,62 5980153.46 587028.19 N 70.35562884 W 149.29324160
8170.69 88.38 110,15 4444,33 4523,03 1731.42 5843,18 1780,37 3754,12 1,65 0,09 1,65 5980142,67 587059.08 N 70,35559840 W 149,29299175
8201,08 88.28 110,01 4445.22 4523,92 1759,98 5873,56 1769,94 3782.65 0.57 -0,33 -0.46 5980132,56 587087,72 N 70,35556987 W 149,29276012
8230,81 88.90 110,50 4445,95 4524.65 1787,96 5903,28 1759,65 3810,53 2,66 2,09 1.65 5980122.59 587115,72 N 70,35554172 W 149,29253376
8262.68 88.83 108,83 4446,58 4525,28 1817.83 5935,14 1748,93 3840.54 5.24 -0,22 -5,24 5980112.20 587145.83 N 70,35551239 W 149,29229017
8294,28 88.73 110.19 4447,25 4525,95 1847.43 5966,74 1738,38 3870.32 4,31 -0,32 4.30 5980101.98 587175,73 N 70,35548352 W 149,29204841
8323,73 89.48 109,35 4447.71 4526.41 1875.06 5996,18 1728.42 3898,03 3,82 2.55 -2.85 5980092.33 587203,54 N 70,35545627 W 149,29182344
8355.45 89.55 109.32 4447,98 4526,68 1904,74 6027.90 1717,92 3927.96 0,24 0,22 -0.09 5980082,16 587233,58 N 70,35542754 W 149.29158046
8387,07 89.41 109.56 4448,27 4526.97 1934,34 6059,52 1707,39 3957,77 0,88 -0.44 0,76 5980071,97 587263.51 N 70,35539875 W 149.29133840
8417.57 89,14 110.31 4448,65 4527.35 1962,99 6090,02 1696,99 3986.44 2,61 -0,89 2.46 5980061,89 587292.29 N 70.35537030 W 149,29110564
8448,80 89,03 109.58 4449.15 4527,85 1992.32 6121,24 1686,34 4015,80 2.36 -0,35 -2,34 5980051.57 587321,76 N 70.35534116 W 149,29086735
8479,96 89,03 110,35 4449,68 4528,38 2021,59 6152.40 1675.70 4045.08 2.47 0,00 2.47 5980041,26 587351.16 N 70,35531205 W 149.29062962
8511.02 89,31 109.94 4450.13 4528,83 2050.80 6183.46 1665,01 4074,24 1,60 0,90 -1,32 5980030,89 587380.43 N 70.35528279 W 149,29039292
8542,50 89,14 109,50 4450,56 4529,26 2080,32 6214.93 1654.39 4103.87 1,50 -0.54 -1.40 5980020,60 587410.17 N 70,35525373 W 149.29015236
8573.63 89,10 110.24 4451,03 4529,73 2109.55 6246.06 1643.81 4133,14 2,38 -0,13 2,38 5980010,35 587439,56 N 70.35522478 W 149,28991472
8604,75 89,00 110.66 4451.55 4530.25 2138,87 6277.18 1632.94 4162,29 1,39 -0.32 1,35 5979999,80 587468,83 N 70.35519504 W 149,28967804
8636.06 88.96 109,92 4452.11 4530.81 2168,34 6308.48 1622,08 4191.66 2,37 -0.13 -2,36 5979989,27 587498.31 N 70.35516534 W 149,28943967
8667.42 89.48 111,11 4452.54 4531,24 2197,90 6339.84 1611,09 4221,02 4,14 1,66 3,79 5979978,61 587527,79 N 70.35513527 W 149.28920126
8697.97 89.07 114,26 4452,92 4531,62 2227,06 6370,39 1599,31 4249.21 10.40 -1,34 10,31 5979967,15 587556.10 N 70,35510305 W 149,28897249
8729,75 88.93 115,34 4453.48 4532,18 2257,73 6402.16 1585.98 4278,05 3.43 -0.44 3.40 5979954,14 587585,09 N 70.35506659 W 149,28873834
8761,18 88,93 115.60 4454,06 4532,76 2288.14 6433.59 1572.47 4306.42 0.83 0,00 0,83 5979940,95 587613,60 N 70.35502963 W 149,28850804
8792,70 88.66 115.44 4454,73 4533.43 2318.66 6465,10 1558,89 4334.86 1,00 -0,86 -0,51 5979927.69 587642.19 N 70.35499249 W 149,28827719
8823,53 88.45 115,21 4455.50 4534,20 2348.47 6495.92 1545.71 4362,72 1.01 -0,68 -0,75 5979914,82 587670.19 N 70,35495643 W 149.28805105
8854,68 90.23 116.92 4455,86 4534.56 2378.70 6527,06 1532,03 4390.69 7,92 5,71 5.49 5979901.45 587698,32 N 70.35491900 W 149,28782394
8885,79 91.64 115.73 4455.35 4534.05 2408,92 6558.17 1518.23 4418,57 5,93 4,53 -3,83 5979887,96 587726,34 N 70,35488128 W 149.28759764
8917.62 91.47 116,20 4454.49 4533.19 2439,79 6589,99 1504,30 4447.18 1,57 -0,53 1.48 5979874,35 587755,10 N 70,35484317 W 149.28736543
8948,92 91.30 116.94 4453,73 4532.43 2470,23 6621,28 1490.31 4475.17 2.43 -0,54 2,36 5979860.67 587783.24 N 70.35480489 W 149,28713826
8979,55 90,95 116,08 4453.13 4531,83 2500,00 6651.90 1476.64 4502,57 3,03 -1,14 -2,81 5979847,31 587810,79 N 70.35476750 W 149.28691581
9010,60 90.65 116.96 4452,70 4531.40 2530,20 6682,95 1462.77 4530.35 2.99 -0,97 2,83 5979833.76 587838.72 N 70.35472959 W 149,28669032
9043.12 89.45 118.97 4452.67 4531.37 2562.00 6715.47 1447.53 4559,07 7,20 -3,69 6,18 5979818,83 587867,61 N 70,35468788 W 149.28645719
9072.47 88.93 121.32 4453.09 4531,79 2590,91 6744.82 1432.79 4584.45 8.20 -1.77 8,01 5979804,38 587893,14 N 70,35464758 W 149.28625122
9103,90 88.62 121.17 4453.76 4532,46 2621,97 6776,24 1416.49 4611,31 1,10 -0,99 -0.48 5979788.38 587920.18 N 70.35460301 W 149,28603316
9135.83 88.52 122,01 4454.55 4533.25 2653,54 6808,16 1399,77 4638,50 2.65 -0.31 2,63 5979771,97 587947.55 N 70.35455728 W 149,28581247
9165.85 88.11 121 ,39 4455.44 4534,14 2683,24 6838,17 1384.00 4664.03 2.48 -1,37 -2,07 5979756.48 587973.26 N 70,35451416 W 149.28560526
9197.24 88.18 120,73 4456.45 4535.15 2714,23 6869,54 1367.81 4690,91 2,11 0,22 -2,10 5979740.60 588000.31 N 70,35446990 W 149,28538712
9227,70 88,21 121,37 4457.41 4536,11 2744,30 6899,99 1352.11 4716.99 2,10 0.10 2.10 5979725.19 588026.56 N 70,35442695 W 149,28517542
9258.03 88,35 119.56 4458.32 4537,02 2774.20 6930.30 1336.74 4743,12 5,98 0.46 -5,97 5979710,11 588052.86 N 70.35438492 W 149,28496334
9290,81 89.48 118,69 4458.94 4537.64 2806,38 6963.07 1320.79 4771.75 4.35 3.45 -2,65 5979694.48 588081.66 N 70,35434129 W 149,28473097
9322.07 91,91 118.70 4458,57 4537,27 2837,03 6994,33 1305.78 4799,17 7,77 7,77 0,03 5979679,78 588109.24 N 70.35430024 W 149.28450843
9352,82 93.46 118,53 4457.12 4535.82 2867,14 7025.05 1291,07 4826,13 5,07 5,04 -0,55 5979665,37 588136,36 N 70.35426001 W 149,28428958
9384,91 93.53 118,02 4455.17 4533,87 2898,51 7057.08 1275.90 4854,34 1,60 0,22 -1,59 5979650.52 588164.73 N 70,35421851 W 149.28406062
9415,98 93,12 119.08 4453,37 4532,07 2928,91 7088.09 1261,08 4881,58 3,65 -1,32 3.41 5979636,00 588192.14 N 70.35417796 W 149.28383948
9447,21 91.54 118,80 4452,10 4530.80 2959.53 7119.30 1245.98 4908,89 5.14 -5,06 -0,90 5979621,20 588219.61 N 70,35413667 W 149.28361785
9478,09 88.90 117.63 4451,98 4530,68 2989.75 7150.17 1231,38 4936,10 9,35 -8.55 -3.79 5979606.91 588246,98 N 70,35409674 W 149,28339701
9508,98 88.45 118,77 4452,69 4531.39 3019,98 7181.06 1216.79 4963,31 3,97 -1.46 3,69 5979592,62 588274,35 N 70,35405682 W 149,28317611
9539,86 88,31 118.48 4453,57 4532.27 3050.25 7211,92 1202.00 4990.41 1,04 -0.45 -0,94 5979578,14 588301.61 N 70,35401637 W 149,28295620
9571,27 87,73 118,50 4454,65 4533,35 3081.00 7243,31 1187,02 5018,00 1,85 -1,85 0,06 5979563.47 588329,36 N 70,35397542 W 149.28273227
9601,53 87.49 119,29 4455,91 4534,61 3110.67 7273,55 1172.42 5044.47 2,73 -0,79 2,61 5979549,16 588355,99 N 70,35393546 W 149,28251743
9632.69 87,32 118,67 4457,32 4536,02 3141.23 7304,68 1157.33 5071.70 2,06 -0,55 -1,99 5979534,38 588383,38 N 70.35389421 W 149,28229642
9663,94 87.59 119.37 4458,71 4537.41 3171,87 7335,90 1142,19 5099,00 2.40 0,86 2.24 5979519.55 588410,84 N 70,35385278 W 149,28207485
9694,77 87,18 119,20 4460,12 4538,82 3202,13 7366,69 1127,12 5125,86 1.44 -1,33 -0.55 5979504.78 588437.87 N 70,35381158 W 149.28185684
9726,19 87,12 119,27 4461,68 4540,38 3232,96 7398,07 1111,80 5153,24 0,29 -0,19 0,22 5979489,76 588465.42 N 70,35376965 W 149,28163458
9757,56 87,18 119,39 4463,24 4541,94 3263,75 7429.40 1096.45 5180,56 0,43 0.19 0.38 5979474,72 588492.90 N 70,35372768 W 149,28141290
9788,29 87,15 119,71 4464,76 4543.46 3293,94 7460.10 1081,31 5207.26 1,04 -0.10 1,04 5979459.88 588519,76 N 70,35368627 W 149,28119619
9819,56 87,94 120,06 4466,10 4544,80 3324,69 7491,34 1065,75 5234,34 2,76 2,53 1,12 5979444.62 588547,02 N 70,35364370 W 149,28097636
9850,87 89,51 121.40 4466,80 4545,50 3355,58 7522,64 1049,75 5261,25 6,59 5,01 4.28 5979428.93 588574.10 N 70,35359995 W 149,28075800
9881,79 90.27 120,86 4466,86 4545.56 3386.13 7553.56 1033,77 5287,72 3,02 2.46 -1,75 5979413,24 588600,74 N 70.35355623 W 149,28054320
9912,65 89,21 120.25 4467,00 4545,70 3416,57 7584.42 1018.08 5314,29 3,96 -3.43 -1,98 5979397.85 588627.48 N 70,35351332 W 149,28032752
9943,81 88.72 120.59 4467.56 4546.26 3447,29 7615,57 1002.31 5341,16 1,91 -1.57 1,09 5979382,38 588654,52 N 70,35347017 W 149,28010949
9974,53 88,52 120,96 4468,30 4547,00 3477,61 7646,28 986,59 5367.54 1,37 -0,65 1,20 5979366,96 588681,08 N 70,35342719 W 149,27989534
10006,59 88,79 120,70 4469,05 4547,75 3509,25 7678,34 970,17 5395.07 1,17 0,84 -0,81 5979350,84 588708.78 N 70,35338226 W 149.27967199
10037,57 88.55 121,61 4469,77 4548.47 3539,85 7709.31 954.14 5421,57 3,04 -0.77 2,94 5979335,12 588735.46 N 70,35333844 W 149,27945688
10068,33 87,29 119,89 4470,89 4549,59 3570.19 7740,05 938.43 5447,99 6,93 -4,10 -5,59 5979319,70 588762,04 N 70,35329545 W 149,27924250
1 0099.46 86.46 119,55 4472,58 4551,28 3600,77 7771,13 923.02 5474,98 2,88 -2,67 -1,09 5979304.59 588789,20 N 70,35325330 W 149,27902342
10130.47 87,87 121,70 4474,12 4552,82 3631.33 7802,10 907,24 5501,63 8,28 4,55 6,93 5979289,11 588816.03 N 70,35321015 W 149,27880715
10161,25 88,69 121,12 4475,04 4553,74 3661.75 7832.87 891,21 5527.89 3,26 2,66 -1,88 5979273,37 588842,46 N 70,35316629 W 149.27859406
10192,30 89,68 119,99 4475.48 4554,18 3692,38 7863,91 875.42 5554,62 4,84 3,19 -3.64 5979257,89 588869,36 N 70,35312312 W 149,27837709
SurveyEditor Ver 3.1 RT-SP3,03-HF4,00 Bld( do31 rt-546 )
N-U\L-201\L-201 L2\L-201 L2
Generated 5/5/2004 1 :01 PM Page 3 of 5
') )
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section Departure
(It ) (deg) (deg) (It ) (It ) (It ) (It ) (It ) (ft ) (deg/100 ft) (deg/100 ft) ( deg/100 ft ) (ftUS) (ftUS)
10223.23 89.58 119.92 4475,68 4554,38 3722,83 7894,84 859,98 5581 .42 0,39 -0,32 -0.23 5979242.74 588896,33 N 70,35308087 W 149.27815961
10254.75 89.10 120,20 4476,05 4554.75 3753,88 7926,36 844,19 5608,70 1,76 -1,52 0,89 5979227,26 588923,78 N 70,35303769 W 149,27793823
10285,04 90,30 121.54 4476,20 4554,90 3783,78 7956,65 828,65 5634,70 5,94 3,96 4.42 5979212,01 588949,94 N 70,35299518 W 149.27772725
10316,50 91.13 122,27 4475,81 4554,51 3814,92 7988,11 812,03 5661 .40 3,51 2.64 2,32 5979195.69 588976,83 N 70,35294970 W 149.27751054
10346.85 91.02 121,70 4475,24 4553.94 3844,97 8018.45 795,95 5687,14 1,91 -0,36 -1.88 5979179,90 589002.74 N 70,35290574 W 149.27730167
10378,50 90.68 121,37 4474,77 4553.47 3876,27 8050,10 779.40 5714.11 1,50 -1.07 -1,04 5979163,65 589029,90 N 70.35286047 W 149,27708278
10409,36 90.75 122,62 4474,39 4553,09 3906,83 8080,96 763.05 5740,28 4,06 0,23 4,05 5979147,60 589056.24 N 70,35281575 W 149,27687041
10439,88 90.61 122,52 4474.02 4552,72 3937.09 8111.47 746,62 5766.00 0,56 -0.46 -0,33 5979131.46 589082,14 N 70,35277081 W 149,27666171
10470,89 90,16 121,85 4473,82 4552,52 3967,81 8142.48 730,11 . 5792,24 2,60 -1.45 -2,16 5979115,24 589108,56 N 70,35272563 W 149,27644875
10502.40 89.69 122,16 4473,86 4552.56 3999,02 8H3,99 713.41 5818,97 1,79 -1 .49 0.98 5979098,83 589135.47 N 70,35267995 W 149.27623191
10533.02 88.76 123.05 4474.27 4552,97 4029,38 8204.61 696,91 5844,76 4,20 -3.04 2.91 5979082,63 589161.44 N 70,35263483 W 149.27602262
10564,03 89.14 127.49 4474,84 4553.54 4060,27 8235,61 679.01 5870,06 14.37 1,23 14.32 5979065.01 589186,94 N 70,35258588 W 149.27581726
10595.33 89.68 127.73 4475,16 4553.86 4091,54 8266,91 659.91 5894,86 1,89 1,73 0,77 5979046,19 589211.94 N 70,35253364 W 149.27561609
10627.04 89.34 127.39 4475.43 4554,13 4123,22 8298,62 640,58 5919,99 1,52 -1,07 -1,07 5979027.14 589237,29 N 70,35248078 W 149,27541214
10658,20 88.90 128,03 4475.91 4554,61 4154,35 8329,78 621,52 5944.64 2.49 -1.41 2.05 5979008,36 589262,14 N 70.35242867 W 149.27521215
10690,14 89,55 129,37 4476,34 4555.04 4186,28 8361.71 601.56 5969.57 4,66 2,04 4,20 5978988.68 589287,29 N 70,35237406 W 149,27500993
10721,53 90.27 131.51 4476.39 4555.09 4217,67 8393,10 581.19 5993.45 7.19 2,29 6.82 5978968,58 589311 .40 N 70.35231839 W 149.27481611
10751,59 90,10 131,53 4476.30 4555,00 4247,72 8423.16 561,27 6015.96 0,57 -0,57 0,07 5978948.91 589334.12 N 70.35226390 W 149,27463352
10782,38 88.45 131,95 4476.69 4555,39 4278.49 8453,95 540,77 6038.93 5.53 -5,36 1,36 5978928.67 589357,32 N 70.35220786 W 149,27444715
10814,35 86.29 129,92 4478,15 4556.85 4310.42 8485,88 519,85 6063.06 9,27 -6,76 -6,35 5978908,02 589381.67 N 70,35215065 W 149,27425144
10845,11 83,88 132,02 4480.79 4559.49 4341,06 8516,53 499,76 6086,19 10.37 -7.83 6,83 5978888.19 589405,03 N 70.35209571 W 149,27406372
10876,17 83.54 131,13 4484,19 4562,89 4371,92 8547.40 479,27 6109,29 3,05 -1,09 -2,87 5978867.97 589428.35 N 70,35203969 W 149,27387636
10907,24 83,74 131.16 4487,63 4566,33 4402,79 8578,28 458,95 6132,54 0,65 0,64 0.10 5978847,91 589451,82 N 70.35198413 W 149.27368771
10937,75 83,68 131.58 4490,98 4569,68 4433.11 8608.61 438,91 6155,30 1,38 -0,20 1,38 5978828,12 589474,80 N 70,35192933 W 149.27350307
10968,51 83,60 130.74 4494,38 4573.08 4463,67 8639,18 418.79 6178,32 2,73 -0,26 -2,73 5978808,26 589498.04 N 70,35187431 W 149,27331635
11000,26 83,70 131.72 4497,90 4576,60 4495,22 8670.73 397,99 6202,05 3.08 0,31 3,09 5978787,73 589522,00 N 70,35181744 W 149.27312383
11030.10 82.88 132.52 4501,38 4580.08 4524.83 8700,37 378.12 6224,03 3,83 -2,75 2,68 5978768,10 589544.19 N 70.35176309 W 149,27294551
11060,81 82,81 133.25 4505,21 4583,91 4555,27 8730.84 357,38 6246,36 2,37 -0,23 2,38 5978747,62 589566.75 N 70,35170639 W 149.27276439
11093,11 86,32 135.55 4508,27 4586,97 4587,32 8762,99 334,89 6269.32 12,97 10.87 7.12 5978725,38 589589.96 N 70,35164489 W 149.27257808
11123,24 87.59 136,36 4509,87 4588.57 4617.24 8793,08 313.26 6290,24 5,00 4.22 2,69 5978703.99 589611.12 N 70.35158576 W 149,27240841
11156,00 88.14 136,93 4511,09 4589.79 4649,76 8825.81 289.46 6312.71 2.42 1.68 1.74 5978680.44 589633,85 N 70,35152068 W 149.27222612
11186,56 91.40 137.49 4511,21 4589,91 4680,07 8856.37 267.04 6333.47 10,82 10.67 1,83 5978658,25 589654,85 N 70.35145937 W 149,27205777
11216,83 92,67 134.73 4510.14 4588,84 4710,15 8886.62 245.24 6354.44 10.03 4.20 -9,12 5978636,69 589676,06 N 70.35139977 W 149.27188767
11248.29 92.16 132.68 4508,81 4587,51 4741,51 8918.05 223,52 6377.16 6.71 -1,62 -6,52 5978615,23 589699,02 N 70.35134039 W 149,27170337
11280,02 92.94 128,57 4507.40 4586,10 4773.20 8949.75 202,89 6401,22 13,17 2.46 -12.95 5978594,87 589723.30 N 70.35128397 W 149,27150824
11310.85 91.54 127.38 4506,19 4584,89 4803.99 8980.55 183,93 6425,50 5,96 -4,54 -3,86 5978576.19 589747.79 N 70,35123213 W 149,27131123
11341,87 91.06 128.37 4505.49 4584,19 4834,98 9011.57 164,89 6449,98 3,55 -1.55 3.19 5978557.42 589772.48 N 70.35118005 W 149,27111264
11372.69 91.19 128,88 4504,88 4583.58 4865.78 9042,38 145,66 6474.05 1,71 0.42 1,65 5978538.46 589796,76 N 70,35112745 W 149,27091734
11404,34 90,34 128,04 4504.46 4583,16 4897.42 9074,03 125,97 6498,83 3,78 -2,69 -2.65 5978519,05 589821.76 N 70,35107362 W 149,27071630
11434,35 90.92 128.79 4504.13 4582,83 4927.42 9104.04 107,33 6522,34 3,16 1.93 2.50 5978500,67 589845.47 N 70.35102263 W 149.27052556
11465.92 92.43 131,27 4503,21 4581,91 4958,97 9135,59 87,03 6546.50 9.19 4,78 7.86 5978480,65 589869,86 N 70,35096713 W 149,27032956
11497.03 91.98 133.43 4502,01 4580,71 4990,03 9166.68 66,09 6569.48 7,09 -1.45 6,94 5978459,97 589893.06 N 70,35090986 W 149.27014321
11528.20 91,74 134.64 4501,00 4579,70 5021,10 9197,83 44.44 6591,87 3,96 -0,77 3.88 5978438,57 589915,69 N 70.35085065 W 149,26996155
11559.77 91.16 135.00 4500,20 4578,90 5052,55 9229,39 22.19 6614,26 2.16 -1,84 1.14 5978416,57 589938,32 N 70.35078982 W 149,26977998
11590,62 91.81 134.26 4499.40 4578,10 5083.29 9260,23 0.53 6636,21 3.19 2,11 -2.40 5978395,15 589960,51 N 70,35073058 W 149.26960196
11622,01 92,43 134,45 4498,24 4576,94 5114,57 9291,60 -21.40 6658,64 2.07 1,98 0.61 5978373.48 589983,18 N 70.35067062 W 149,26942004
11653,65 92.43 133.82 4496,90 4575,60 5146.10 9323,21 -43.41 6681,32 1.99 0.00 -1,99 5978351.72 590006.10 N 70,35061043 W 149.26923602
11685.79 92,02 1 33.40 4495,65 4574.35 5178,15 9355,33 -65,57 6704,58 1,83 -1,28 -1.31 5978329.83 590029,60 N 70.35054985 W 149,26904741
11714,92 90.78 132,17 4494,94 4573,64 5207.23 9384.45 -85,35 6725,95 5,99 -4,26 -4,22 5978310,29 590051,19 N 70.35049577 W 149,26887406
11746,56 87,83 130,57 4495,32 4574,02 5238,86 9416,08 -106,25 6749,69 10,61 -9,32 -5,06 5978289,65 590075.16 N 70.35043859 W 149,26868150
11778,71 85,08 131,92 4497,31 4576.01 5270,94 9448,17 -127.41 6773,81 9.52 -8,55 4,20 5978268,77 590099,51 N 70,35038075 W 149,26848581
11808.50 84,84 132.83 4499,93 4578,63 5300,59 9477,84 -147.41 6795,73 3.15 -0,81 3,05 5978249.02 590121.65 N 70,35032605 W 149,26830799
11839.67 85,22 132,16 4502,63 4581.33 5331,61 9508,89 -168,38 6818,63 2.46 1,22 -2,15 5978228,30 590144,78 N 70.35026869 W 149,26812228
11870.35 84,64 131,86 4505,34 4584,04 5362,15 9539.45 -188,83 6841,34 2.13 -1,89 -0,98 5978208,10 590167,71 N 70.35021276 W 149,26793810
11901,17 85,33 133.03 4508,03 4586,73 5392,82 9570,16 -209.55 6863,99 4,39 2,24 3.80 5978187.64 590190.59 N 70.35015610 W 149,26775434
11934.41 86,12 132,80 4510,51 4589,21 5425,93 9603,30 -232,13 6888,27 2.47 2,38 -0,69 5978165,34 590215,12 N 70,35009438 W 149.26755744
11965,63 85.81 132.73 4512,71 4591.41 5457,03 9634.45 -253.27 6911.13 1,02 -0,99 -0,22 5978144.45 590238,21 N 70,35003655 W 149,26737200
11997,37 85,50 132,32 4515,11 4593,81 5488,65 9666,10 -274,66 6934.46 1,62 -0.98 -1,29 5978123,32 590261,77 N 70,34997805 W 149,26718281
12028,08 84,64 131,22 4517,75 4596.45 5519,23 9696,69 -295,04 6957,28 4,54 -2,80 -3,58 5978103,20 590284,81 N 70,34992232 W 149,26699773
12059,16 85,08 132,10 4520,54 4599,24 5550,17 9727,65 -315.62 6980.40 3,16 1.42 2,83 5978082,88 590308,16 N 70,34986605 W 149,26681015
12090,10 87,94 131,51 4522.42 4601.12 5581,04 9758,53 -336,20 7003.42 9.44 9,24 -1,91 5978062,56 590331.41 N 70,34980976 W 149,26662346
12121,02 89,96 128.34 4522.99 4601,69 5611,95 9789.44 -356,04 7027,12 12,15 6,53 -10,25 5978042,99 590355.33 N 70,34975550 W 149,26643118
12152.42 89,82 127,16 4523,05 4601,75 5643,32 9820,84 -375,26 7051,95 3,78 -0.45 -3,76 5978024,04 590380,36 N 70,34970292 W 149.26622979
12183,21 89,24 126,96 4523,30 4602,00 5674,07 9851.63 -393,82 7076,52 1,99 -1,88 -0,65 5978005.77 590405,14 N 70.34965217 W 149.26603048
12214,26 88.48 126.57 4523.92 4602,62 5705.06 9882,67 -412.40 7101,39 2,75 -2.45 -1,26 5977987.46 590430,21 N 70,34960134 W 149,26582875
12244.29 89,35 128,14 4524,49 4603.19 5735,06 9912,70 -430,62 7125,25 5,98 2,90 5,23 5977969,52 590454,27 N 70,34955151 W 149.26563516
12275,23 89,89 129.75 4524,69 4603,39 5765,99 9943.64 -450,06 7149,32 5.49 1,75 5,20 5977950,34 590478,55 N 70,34949832 W 149,26543998
12307,82 89,21 128,61 4524,95 4603,65 5798,57 9976.22 -470,65 7174,58 4,07 -2,09 -3,50 5977930.04 590504,03 N 70.34944201 W 149.26523508
12338,38 88,21 126,83 4525,63 4604,33 5829,10 10006.78 -489,34 7198,74 6,68 -3,27 -5,82 5977911,62 590528.40 N 70.34939089 W 149,26503906
12369,81 88,93 127,87 4526.42 4605,12 5860.49 10038,19 -508.40 7223.72 4.02 2,29 3,31 5977892,84 590553,59 N 70,34933875 W 149,26483646
12401.41 90,10 129,25 4526,69 4605,39 5892,07 10069,79 -528,10 7248,43 5,73 3,70 4,37 5977873.42 590578,51 N 70.34928488 W 149,26463605
12432,16 90.03 130,18 4526,65 4605.35 5922,82 10100,54 -547,75 7272,08 3,03 -0.23 3,02 5977854,03 590602,38 N 70.34923114 W 149,26444419
SurveyEditor Ver 3,1 RT -SP3,03-HF4,OO Bld( do31 rt-546 )
N-U\L-201\L-201 L2\L-201 L2
Generated 5/5/2004 1 :01 PM Page 4 of 5
') )
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Wal k Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (It) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/100 ft ) ( deg/1 00 ft ) ( deg/100 It ) (ftUS) (ltUS)
12463,25 89,27 129,14 4526,84 4605,54 5953,91 10131,63 -567,59 7296,02 4.14 -2.44 -3.35 5977834.46 590626.53 N 70,34917687 W 149,26425007
12494.97 89,79 129,01 4527,10 4605,80 5985,63 10163.35 -587.58 7320,64 1,69 1,64 -0.41 5977814.75 590651,37 N 70,34912218 W 149,26405035
12526,07 89,31 128,89 4527,35 4606,05 6016,72 10194.45 -607,13 7344.83 1.59 -1,54 -0.39 5977795,47 590675,77 N 70,34906871 W 149,26385417
12556.34 89,93 128,76 4527,55 4606,25 6046,98 10224,72 -626.11 7368.41 2.09 2,05 -0.43 5977776.76 590699,56 N 70,34901680 W 149,26366290
12587,66 93.60 128,64 4526,58 4605,28 6078,27 1 0256.02 -645.68 7392.83 11,72 11,72 -0,38 5977757,46 590724,20 N 70,34896327 W 149,26346477
12618,23 95.04 126,26 4524,28 4602,98 6108,72 10286.50 -664,21 7417,03 9,08 4,71 -7.79 5977739.20 590748.60 N 70,34891257 W 149,26326850
12649.61 94.25 125.45 4521,74 4600.44 6139,92 10317,78 -682,53 7442,38 3,60 -2,52 -2,58 5977721.16 590774,15 N 70,34886246 W 149.26306288
12680.74 93.77 125.40 4519,56 4598.26 6170,87 10348,83 -700.53 7467,69 1,55 -1,54 -0.16 5977703.45 590799,65 N 70,34881321 W 149,26285762
12711,97 93.19 123,58 4517,67 4596,37 6201,90 10380,00 -718,18 7493,38 6.11 -1,86 -5.83 5977686,08 590825,53 N 70,34876492 W 149,26264921
12742,60 90.92 122.98 4516,57 4595,27 6232.30 10410,61 -734,98 7518.97 7,67 -7.41 -1,96 5977669.58 590851.31 N 70,34871897 W 149.26244164
12775,06 89.27 120,92 4516,51 4595,21 6264.44 10443,07 -752.16 7546.51 8.13 -5.08 -6.35 5977652.71 590879,03 N 70,34867197 W 149,26221823
12806.10 86.53 119,31 4517,65 4596,35 6294,99 10474,09 -767.72 7573.33 10,24 -8,83 -5,19 5977637.45 590906,03 N 70.34862939 W 149.26200058
12837,10 87.32 121,67 4519,31 4598,01 6325,52 10505.04 -783.42 7600,01 8.02 2,55 7,61 5977622,04 590932,87 N 70,34858641 W 149.26178420
12868.84 88.76 123,05 4520.40 4599,10 6356,96 10536.76 -800.40 7626,80 6,28 4,54 4,35 5977605.37 590959,85 N 70,34853995 W 149.26156685
12899.53 86.35 121,25 4521,71 4600.41 6387.33 10567.42 -816,72 7652.76 9,80 -7,85 -5,87 5977589,34 590985,99 N 70,34849531 W 149.26135628
12930,78 85.98 120,92 4523,80 4602,50 6418.13 10598,60 -832.81 7679.46 1,58 -1.18 -1,06 5977573.54 591012,86 N 70,34845125 W 149.26113967
12962.02 86.84 120,25 4525.75 4604.45 6448.89 10629,78 -848.68 7706,30 3.49 2,75 -2,14 5977557.98 591039.88 N 70.34840784 W 149,26092194
12991,90 86.63 120.86 4527.46 4606,16 6478,32 10659,61 -863,84 7731.99 2.16 -0,70 2,04 5977543,10 591065.73 N 70,34836634 W 149,26071354
13022.94 85.29 120.46 4529.64 4608,34 6508.87 10690,58 -879.63 7758,62 4,50 -4,32 -1,29 5977527.61 591092.54 N 70,34832313 W 149,26049748
13053,33 86.73 121,90 4531.76 4610.46 6538,82 10720,89 -895.33 7784,56 6,69 4,74 4,74 5977512,21 591118,64 N 70,34828018 W 149,26028709
13091,95 88,83 120.88 4533.25 4611,95 6576.98 10759.48 -915.43 7817,50 6,04 5.44 -2,64 5977492.48 591151,80 N 70,34822517 W 149,26001988
13122,58 88,83 122.09 4533.88 4612,58 6607.26 10790.10 -931.42 7843,62 3,95 0.00 3,95 5977476.78 591178,09 N 70.34818141 W 149,25980804
13154.46 89,31 122,19 4534.40 4613,10 6638.84 10821,98 -948,38 7870,61 1.54 1.51 0,31 5977460.12 591205,26 N 70,34813500 W 149,25958910
13186,07 89,07 121.34 4534,84 4613,54 6670.12 10853.59 -965,02 7897.48 2,79 -0.76 -2,69 5977443.78 591232.32 N 70,34808947 W 149.25937111
13217.41 89.07 122,24 4535,35 4614,05 6701,13 10884,92 -981,52 7924,11 2,87 0.00 2,87 5977427.58 591259,13 N 70,34804430 W 149,25915506
13248,94 88,18 121.43 4536.11 4614,81 6732,34 10916.44 -998,15 7950.89 3,82 -2.82 -2,57 5977411,25 591286,09 N 70,34799880 W 149,25893784
13278,92 88,32 121.12 4537.02 4615,72 6761.95 10946.41 -1013,71 7976.50 1,13 0.47 -1,03 5977395.98 591311.87 N 70,34795622 W 149.25873009
13311,79 88,05 121.06 4538.07 4616,77 6794.41 10979,26 -1030,67 8004,64 0,84 -0,82 -0,18 5977379,33 591340,19 N 70,34790979 W 149,25850187
13343,00 87.49 121.65 4539,28 4617,98 6825.24 11010,45 -1046,90 8031.27 2.61 -1.79 1.89 5977363.40 591367.00 N 70,34786539 W 149,25828584
13374.33 86.98 121.73 4540.79 4619.49 6856,21 11041,74 -1063,34 8057.90 1,65 -1,63 0.26 5977347,26 591393,80 N 70,34782040 W 149,25806985
13405.34 87,32 121,63 4542,33 4621,03 6886.85 11072.71 -1079.60 8084.25 1.14 1.10 -0.32 5977331,29 591420.34 N 70.34777588 W 149,25785606
13440,36 88,76 121.38 4543,53 4622,23 6921.47 11107,71 -1097.89 8114.09 4.17 4.11 -0.71 5977313,34 591450,38 N 70.34772583 W 149.25761401
13490,00 88.76 121,38 4544,61 4623,31 6970,54 11157,34 -1123,74 8156.46 0.00 0.00 0,00 5977287,97 591493,03 N 70,34765511 W 149.25727033
LeQal Description:
NorthlnQ IY) mUSl EastlnQ IX) [ftUS]
Surface: 2597 FSL 3588 FEL S34 T12N R11 E UM 5978320,84 583325.34
BHL: 1469 FSL 714 FEL S35 T12N R11 E UM 5977287.97 591493,03
SurveyEditor Ver 3,1 RT-SP3,03-HF4,OO Bld( do31 rt-546 )
N-U\L-201 \L-201 L2\L-201 L2
Generated 5/5/2004 1 :01 PM Page 5 of 5
TREE = FMC 4-1/6" 5M
W8..LHEAD = FMC G8\I 5
AGrUÄTOR ;'"
KS:....ECEil';;;'··........, ·..····"·..'j's:..:¡Cÿ'
äÞ:'äË\/';;;" . 51":g3õ
"~<"6p";"""'"''''''''''''''''''''~''''''''''''''' ..,.w.,,""w·.....3'ÕC)'
,~~.~~_~I.~~..·.:~~~..·,~·,~..~!.:~:~·"
Datum MD = 6137'
"M...",'''''''."".",....,.,....,.,.,...,..,,'''.. nwl'l'."'.....",.",."....................... ... '......n'....,,.,'
Datum rvD = 4400' SS I H
20" CONOUGrOR
110-3/4" CSG. 45.5#, L-80, ID = 9.95" l-i
3197'
Minimum ID = 3.813" @ 2266'
4-112" HES X NIPPLE
14-112" A-IOENIX DSCHRGE-PRESS SUB,ID = 3.85"1-1
[4-112" A-IOENIX JEr RJMPS8\lSOR, ID = 3.833"
I.,
IRA TAG 1-1
5975'
17 -5/8" X 5-H2" BKR ZXP A<R, ID = 5.75" 1-1
5982'
I BKR HUGHES HOOK HGR, ID = 5.64" 1-1
6020'
IRA TAG 1-1 6179'
17-5/8" X 5-112" BKR ZXP A<R, 10 = 5.75" I-{ 6173'
IBKR HU3HES HOOK HGR, 10 = 5.64" 1-1 6224'
IRA TAG 1-1 6324'
17-5/8" X 5-1/2" BKRZXPPKR,ID = 5.75" l-i 6319'
IBKR HU3HES HOOK HGR, 10 = 5.64" l-t 6367'
ÆRFORA TON SUMMARY
REF LOG:
ANGLE AT TOP PERF: xx@ xxx x'
Note: Refer to Production DB for historical perf data
SIZE SFF IN1ERV AL OpnlSqz OA TE
4-1/2" SL TO OA 6090 - 9802 0 04/24/04
4-112" SLTD OBa 6295-13405 0 04/18/04
4-1/2" SLTD OBb 6434 - 13465 0 04/09/04
4-112" SLTD OBd 7028 - 13628 0 04/04104
r 2266' 1-i4-112"HESXNIP,ID=3.813" I
~ GAS LIFT MANDRELS
ST MD TVD DEV 1YÆ VLV LATCH FORT DATE
4 2370 2101 46 KBG-2 DMY BK-5 0 04/23/04
3 3525 2857 50 KBG-2 DMY BK-5 0 04/23/04
2 4680 3612 49 KBG-2 DMY BK-5 0 04/23/04
1 5708 4272 57 KBG-2 00<2 BEK 04/23/04
1 5825' 1-14-1/2" BKR CMD SLIDING SLV , ID = 3.812" I
"Ç7' ~ 5873' 1-t7-5/8" X 4-1/2" BKR FREM A<R,ID = 3.875" I
~ 5942' 1-i4-112"HESXNIP,ID=3.813" I
~ ~ -----l 5963' 1-i4-1/2" HES X NIP, ID = 3.813" I
~r ~ 6000' H4-1/2"BKRSEALASSErvELY I
~ ~ 6001' H5-1/2" X4-1/2"XO, ID= 3.960"1
I-----It ----------------J
~ ~ ----------------
)
L-201
L-201 L 1
L-201 L2
L-201 L3
~
114' I
~
I
5814'
L
¡/I
I~
5849'
~
:=¡
~
~
z
17-5/8"CSG,29.7#, L-80,ID= 6.875" H 7047' ~
~ 13672'
D6.1E REv' BY COM~NTS
05104104 TWA/KA~ ORIGINAL COMPLErION
DATE REV BY
')
I SAFETY NOTES:
7 -5/8" WINDOW @ 6025'
6020' - 9846' 6-3/4" OALATERAL, 10 = 3.958"
IV~. 6200' 1-t4-1/2" BKR SEAL ASSEMBLY I
~_ __ __6-_2~_7-_' __ __~_5-_-1-_/2~_'X-_~_1~_'~_XJO' 10 =3.960"1
7-5/8" WINOOW @ 6229'
~
6224' -13448' 6-3/4" OBa LATERAL, 10 = 3.958"
~ 6346' H4-1/2"BKRSEALASSErvELY I
r ~_ _6~~3~ _ ~5~1~'~X_4~1~'~X~,~D =3.960"1
] 7-5/8"WINOOW@ 6372'
~, -----------------
6367' - 13506' 6-3/4" OBb LATERAL, 10 = 3.958"
z-t
I
I
~ 6922' H
1-t7-5/8" X 5-1/2" BKRZXP LNRTOP PKR, ID =4.840"
1-t4-1 12" BKRSEAL ASSEMBLY I
H5-1/2" X 4-112" XO, ID= 3.980" I
RA TAG I
6432'
6476'
6481'
~
6432' - 13672' 6-3/4" OBd LATERAL, 10 = 3.958"
COM~NTS
ORION UNIT
WB..L: L-201, L-201 L 1, L-201 L2, L-201 L3
ÆRMIT No: 204046 (047) (048) (049)
AA No: 50-029-23202-00 (60) (61) (62)
SEC 34, T12N, R11 E, 2598' NSL & 3588' WB..
BP Exploration (Alaska)
SCHLUMBERGER
Survey report
Client............... ....: BP Exploration Inc.
Field. . . . . . . . . . . . . . . . . . . .: Orion
Well. . . . . . . . . . . . . . . . . . . . .: L201L2
API number. .., ... ........: 50-029-23202-61
Engineer... ......... .....: St. Amour
COUNTY: .... .......... ....: Nabors 9ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS..... ......: Mason & Taylor
----- Depth reference -----------------------
Permanent datum...... ....: Mean Sea Level
Depth reference...... ....: Driller's Pipe Tally
GL above permanent. ......: 50.20 ft
KB above permanent..... ..: NjA (Top Drive)
DF above permanent.... ...: 78.70 ft
----- Vertical section origin----------------
Latitude (+NjS-).... .....: 0.00 ft
Departure (+EjW-)... .....: 0.00 ft
----- Platform reference point---------------
Latitude (+NjS-)... .... ..: -999.25 ft
Departure (+EjW-). .......: -999.25 ft
Azimuth from rotary table to target: 130.00 degrees
19-Apr-2004 10:24:01
Spud date.. .... ... ..... ..:
Last survey date.........:
Total accepted surveys...:
MD of first survey... ....:
MD of last survey........:
Page
1 of 12
1-Mar-04
19-Apr-04
302
0.00 ft
13490.00 ft
----- Geomagnetic data ----------------------
Magnetic model. ..........: BGGM version 2003
Magnetic date.. ...... ....: 12-Apr-2004
Magnetic field strength. . : 1151.25 HCNT
Magnetic dec (+EjW-).....: 25.00 degrees
Magnetic dip.. ...........: 80.82 degrees
----- MWD survey Reference
Reference G..............:
Reference H..............:
Reference Dip............:
Tolerance of G... ........:
Tolerance of H. ..........:
Tolerance of Dip.. .......:
Criteria ---------
1002.68 mGal
1151. 25 HCNT
80.82 degrees
(+j-) 2.50 mGal
(+j-) 6.00 HCNT
(+j-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+EjW-).....: 25.00 degrees
Grid convergence (+EjW-).: 0.00 degrees
Total az corr (+EjW-)....: 25.00 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
,~
~
/
)--
-0
e
C);
e
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 2 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYRO None
3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYRO None
4 324.00 2.13 19.40 100.00 323.97 -1.57 2.37 -0.05 2.38 358.72 1. 76 GYRO None
5 395.00 4.15 21. 01 71.00 394.86 -2.87 6.02 1.31 6.16 12.25 2.85 GYRO None
6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYRO None e
7 595.00 8.86 11.46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYRO None
8 695.00 11.87 12.48 100.00 691. 99 -20.13 44.33 10.92 45.65 13.83 3.02 GYRO None
9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG
10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21. 32 86.02 14.35 3.12 MWD GMAG
11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115.96 14.89 2.38 MWD GMAG
12 1040.82 22.84 16.89 93.36 1021.28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG
13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG
14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG
15 1321.50 29.42 18.07 95.37 1272.00 -111. 15 264.57 76.90 275.52 16.21 1. 53 MWD GMAG
16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91. 86 323.53 16.49 1. 77 MWD GMAG
17 1511.08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1. 83 MWD GMAG
18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG
19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG
20 1797.56 36.27 18.62 98.02 1671.38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG
21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591. 00 17.60 0.97 MWD GMAG e
22 1988.07 39.87 19 .15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG
23 2081.93 41.57 20.11 93.86 1893.38 -267.74 677.09 218.63 711. 51 17.90 1. 93 MWD GMAG
24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG
25 2269.96 45.03 20.88 94.18 2030.82 -311.34 797.53 262.78 839.71 18.24 2.56 MWD GMAG
26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG
27 2458.33 47.95 21. 23 96.59 2161.62 -355.21 923.95 311.59 975.08 18.64 2.54 MWD GMAG
28 2552.24 48.94 21. 51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG
29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG
30 2740.10 50.69 21.63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 3 at 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (de g) (ft) (ft) (ft) (ft) (ft) (ft) (deg) lOOt) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 2834.26 50.10 21.09 94.16 2405.24 -446.33 1190.40 416.22 1261.07 19.27 0.77 MWD GMAG
32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG
33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG
34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG
35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501. 52 19.80 0.67 MWD GMAG
36 3266.50 47.43 25.10 114.34 2688.89 -541.75 1490.59 543.55 1586.61 20.03 1.92 MWD GMAG e
37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561.57 1630.69 20.14 4.16 MWD GMAG
38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG
39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG
40 3609.16 49.34 23.32 93.81 2911.68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG
41 3701.35 50.03 21. 52 92.19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1.67 MWD GMAG
42 3794.96 50.31 21. 39 93.61 3031.29 -659.14 1860.94 701.06 1988.61 20.64 0.32 MWD GMAG
43 3888.81 50.23 21.33 93.85 3091.27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG
44 3982.46 49.83 20.65 93.65 3151. 43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG
45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG
46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277.18 20.66 0.55 MWD GMAG
47 4266.06 48.39 21.00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG
48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG
49 4454.28 47.80 22.75 94.27 3461.74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG
50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG
51 4641.89 48.96 31.87 93.78 3586.62 -853.25 2451.68 943.36 2626.91 21.05 4.03 MWD GMAG e
52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21. 38 3.58 MWD GMAG
53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21.82 3.66 MWD GMAG
54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG
55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG
56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG
57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG
58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG
59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG
60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451.92 3156.80 27.38 5.64 MWD GMAG
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 4 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/w- displ Azim (degl tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG
62 5677.97 56.15 89.22 95.09 4255.06 -581.22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG
63 5769.98 58.26 91. 53 92.01 4304.90 -521.65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG
64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG
65 5955.46 61. 37 98.97 93.30 4399.26 -390.85 2802.35 1841. 23 3353.10 33.31 4.62 MWD GMAG
66 6049.62 64.61 102.59 94.16 4442.03 -317.64 2786.62 1923.60 3386.08 34.62 4.85 MWD GMAG e
67 6143.03 65.95 107.59 93.41 4481.11 -240.71 2764.52 2005.48 3415.34 35.96 5.07 MWD GMAG
68 6229.00 68.41 110.67 85.97 4514.46 -166.68 2738.54 2080.32 3439.10 37.22 4.37 TOP OF WINDOW
69 6241. 00 70.32 110.46 12.00 4518.69 -156.09 2734.60 2090.84 3442.33 37.40 16.00 BOTTOM WINDOW
70 6248.82 70.86 110.87 7.82 4521.29 -149.13 2732.00 2097.74 3444.46 37.52 8.49 MWD Incl. Only
71 6280.05 74.34 112.47 31. 23 4530.63 -120.85 2720.99 2125.43 3452.71 37.99 12.17 MWD Incl. Only
72 6311.72 78.37 114.05 31. 67 4538.10 -91. 38 2708.84 2153.69 3460.66 38.49 13.62 MWD Incl. Only
73 6342.77 82.86 115.55 31. 05 4543.16 -61.83 2695.99 2181.49 3468.04 38.98 15.23 MWD Incl. Only
74 6373.77 87.77 11 7.02 31. 00 4545.69 -31.82 2682.31 2209.19 3474.95 39.48 16.53 MWD Incl. Only
75 6404.96 91. 54 118.49 31.19 4545.88 -1.35 2667.79 2236.78 3481. 42 39.98 12.97 MWD Incl. Only
76 6436.66 93.43 119.98 31.70 4544.50 29.76 2652.32 2264.42 3487.46 40.49 7.59 MWD GMAG
77 6467.17 92.51 121. 35 30.51 4542.92 59.83 2636.78 2290.62 3492.79 40.98 5.40 MWD Incl. Only
78 6498.86 91.78 122.78 31.69 4541.74 91.19 2619.97 2317.46 3497.84 41. 49 5.06 MWD GMAG
79 6529.76 91.98 122.67 30.90 4540.72 121.83 2603.28 2343.44 3502.68 41.99 0.74 MWD GMAG
80 6560.75 91.81 122.83 30.99 4539.70 152.55 2586.52 2369.49 3507.79 42.49 0.75 MWD GMAG
81 6591. 97 92.70 123.94 31.22 4538.47 183.54 2569.35 2395.54 3512.86 42.99 4.55 MWD GMAG e
82 6622.94 91.47 122.58 30.97 4537.34 214.27 2552.38 2421.42 3518.23 43.49 5.92 MWD GMAG
83 6654.79 88.79 124.93 31. 85 4537.27 245.93 2534.69 2447.89 3523.75 44.00 11.19 MWD GMAG
84 6685.75 89.62 123.41 30.96 4537.70 276.73 2517.30 2473.51 3529.17 44.50 5.59 MWD GMAG
85 6716.49 91.43 125.79 30.74 4537.42 307.32 2499.85 2498.80 3534.58 44.99 9.73 MWD GMAG
86 6748.09 91.88 125.69 31.60 4536.51 338.82 2481.40 2524.44 3539.79 45.49 1.46 MWD GMAG
87 6778.86 92.32 125.04 30.77 4535.38 369.47 2463.60 2549.52 3545.33 45.98 2.55 MWD GMAG
88 6809.61 91.88 124.18 30.75 4534.25 400.07 2446.15 2574.81 3551. 52 46.47 3.14 MWD GMAG
89 6841.48 91.02 124.41 31. 87 4533.44 431. 77 2428.20 2601.13 3558.37 46.97 2.79 MWD GMAG
90 6872.68 89.75 124.25 31. 20 4533.24 462.81 2410.60 2626.89 3565.33 47.46 4.10 MWD GMAG
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 5 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
91 6903.03 90.78 124.72 30.35 4533.10 493.02 2393.42 2651.91 3572.26 47.93 3.73 MWD GMAG
92 6934.85 90.20 123.00 31.82 4532.82 524.66 2375.69 2678.33 3580.13 48.43 5.70 MWD GMAG
93 6966.15 89.51 123.07 31. 30 4532.90 555.73 2358.63 2704.57 3588.57 48.91 2.22 MWD GMAG
94 6996.79 90.40 125.50 30.64 4532.93 586.21 2341.37 2729.89 3596.43 49.38 8.45 MWD GMAG
95 7027.89 90.75 126.05 31.10 4532.61 617.23 2323.19 2755.12 3603.87 49.86 2.10 MWD GMAG
96 7058.05 90.68 125.62 30.16 4532.24 647.30 2305.53 2779.56 3611. 30 50.33 1.44 MWD GMAG e
97 7088.89 90.58 125.09 30.84 4531. 90 678.04 2287.69 2804.72 3619.39 50.80 1. 75 MWD GMAG
98 7120.17 90.71 125.09 31. 28 4531.55 709.20 2269.71 2830.31 3627.98 51. 27 0.42 MWD GMAG
99 7151. 57 90.95 125.18 31. 40 4531.09 740.49 2251. 64 2855.98 3636.83 51.75 0.82 MWD GMAG
100 7182.56 90.82 126.27 30.99 4530.61 771.39 2233.55 2881.14 3645.50 52.22 3.54 MWD GMAG
101 7213.70 90.92 125.44 31.14 4530.14 802.44 2215.31 2906.38 3654.40 52.68 2.68 MWD GMAG
102 7245.02 90.78 125.96 31.32 4529.68 833.67 2197.03 2931.81 3663.67 53.15 1.72 MWD GMAG
103 7276.03 90.51 126.98 31. 01 4529.33 864.62 2178.60 2956.74 3672.69 53.62 3.40 MWD GMAG
104 7307.25 90.30 125.32 31. 22 4529.11 895.77 2160.19 2981.95 3682.18 54.08 5.36 MWD GMAG
105 7338.59 91. 50 125.50 31. 34 4528.61 927.00 2142.03 3007.49 3692.33 54.54 3.87 MWD GMAG
106 7369.09 92.94 123.50 30.50 4527.43 957.33 2124.77 3032.60 3702.88 54.98 8.08 MWD GMAG
107 7401.26 92.05 121.30 32.17 4526.03 989.19 2107.55 3059.74 3715.34 55.44 7.37 MWD GMAG
108 7431.83 92.81 119.69 30.57 4524.74 1019.31 2092.05 3086.06 3728.33 55.87 5.82 MWD GMAG
109 7462.82 92.77 118.64 30.99 4523.23 1049.71 2076.97 3113.08 3742.34 56.29 3.39 MWD GMAG
110 7493.89 92.60 118.24 31.07 4521.77 1080.12 2062.19 3140.37 3756.94 56.71 1.40 MWD GMAG
111 7524.87 92 .12 119.42 30.98 4520.50 1110.49 2047.26 3167.49 3771.51 57.12 4.11 MWD GMAG e
112 7555.40 92.77 119.58 30.53 4519.19 1140.48 2032.24 3194.04 3785.75 57.53 2.19 MWD GMAG
113 7586.23 92.87 119.27 30.83 4517.68 1170.75 2017.11 3220.86 3800.35 57.94 1. 06 MWD GMAG
114 7616.72 91.78 119.82 30.49 4516.44 1200.71 2002.09 3247.36 3814.94 58.34 4.00 MWD GMAG
115 7648.68 91.50 120.56 31.96 4515.53 1232.18 1986.03 3274.98 3830.11 58.77 2.47 MWD GMAG
116 7678.75 91.30 118.58 30.07 4514.79 1261. 75 1971.19 3301.12 3844.87 59.16 6.62 MWD GMAG
117 7710.19 89.75 116.02 31. 44 4514.50 1292.41 1956.77 3329.05 3861.55 59.55 9.52 MWD GMAG
118 7740.23 89.07 115.88 30.04 4514.81 1321. 55 1943.63 3356.06 3878.25 59.92 2.31 MWD GMAG
119 7770.76 89.10 114.78 30.53 4515.30 1351.08 1930.57 3383.65 3895.67 60.29 3.60 MWD GMAG
120 7801.46 89.44 113.27 30.70 4515.69 1380.59 1918.07 3411.69 3913.90 60.66 5.04 MWD GMAG
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 6 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
121 7832.24 89.51 112.57 30.78 4515.97 1410.02 1906.09 3440.04 3932.82 61. 01 2.29 MWD GMAG
122 7863.07 88.52 112.49 30.83 4516.50 1439.42 1894.28 3468.51 3952.07 61.36 3.22 MWD GMAG
123 7893.97 88.17 111.13 30.90 4517.40 1468.76 1882.80 3497.19 3971.81 61.70 4.54 MWD GMAG
124 7924.35 87.80 111. 31 30.38 4518.46 1497.51 1871.81 3525.49 3991.59 62.03 1. 35 MWD GMAG
125 7954.78 88.62 112.43 30.43 4519.41 1526.41 1860.48 3553.72 4011.27 62.37 4.56 MWD GMAG
126 7985.18 89.17 112.51 30.40 4520.00 1555.39 1848.86 3581.80 4030.83 62.70 1. 83 MWD GMAG e
127 8015.88 89.51 113.01 30.70 4520.35 1584.71 1836.99 3610.11 4050.61 63.03 1. 97 MWD GMAG
128 8046.12 89.51 112 . 14 30.24 4520.61 1613.56 1825.38 3638.03 4070.29 63.35 2.88 MWD GMAG
129 8077.32 89.51 113.36 31. 20 4520.88 1643.36 1813.32 3666.80 4090.67 63.69 3.91 MWD GMAG
130 8107.85 88.76 110.70 30.53 4521. 34 1672.39 1801. 87 3695.10 4111. 02 64.00 9.05 MWD GMAG
131 8137.95 88.35 109.61 30.10 4522.10 1700.70 1791. 50 3723.35 4131.92 64.31 3.87 MWD GMAG
132 8170.69 88.38 110.15 32.74 4523.03 1731.43 1780.37 3754.12 4154.89 64.63 1. 65 MWD GMAG
133 8201.08 88.28 110.01 30.39 4523.92 1759.98 1769.94 3782.65 4176.26 64.92 0.57 MWD GMAG
134 8230.81 88.90 110.50 29.73 4524.65 1787.96 1759.65 3810.53 4197.21 65.21 2.66 MWD GMAG
135 8262.68 88.83 108.83 31.87 4525.28 1817.83 1748.93 3840.54 4220.01 65.52 5.24 MWD GMAG
136 8294.28 88.73 no .19 31. 60 4525.96 1847.43 1738.38 3870.32 4242.80 65.81 4.31 MWD GMAG
137 8323.73 89.48 109.35 29.45 4526.42 1875.06 1728.42 3898.03 4264.04 66.09 3.82 MWD GMAG
138 8355.45 89.55 109.32 31.72 4526.68 1904.74 1717.92 3927.96 4287.20 66.38 0.24 MWD GMAG
139 8387.07 89.41 109.56 31.62 4526.97 1934.34 1707.39 3957.77 4310.36 66.66 0.88 MWD GMAG
140 8417.57 89.14 110.31 30.50 4527.36 1962.99 1696.99 3986.44 4332.61 66.94 2.61 MWD GMAG
141 8448.80 89.03 109.58 31.23 4527.86 1992.32 1686.34 4015.80 4355.50 67.22 2.36 MWD GMAG e
142 8479.96 89.03 110.35 31.16 4528.38 2021.59 1675.71 4045.08 4378.43 67.50 2.47 MWD GMAG
143 8511. 02 89.31 109.94 31.06 4528.83 2050.80 1665.01 4074.24 4401.32 67.77 1. 60 MWD GMAG
144 8542.50 89.14 109.50 31. 48 4529.26 2080.32 1654.39 4103.87 4424.79 68.04 1. 50 MWD GMAG
145 8573.63 89.10 110.24 31.13 4529.74 2109.55 1643.81 4133.14 4448.03 68.31 2.38 MWD GMAG
146 8604.75 89.00 nO.66 31.12 4530.25 2138.87 1632.94 4162.29 4471.15 68.58 1.39 MWD GMAG
147 8636.06 88.96 109.92 31. 31 4530.81 2168.34 1622.08 4191.66 4494.57 68.84 2.37 MWD GMAG
148 8667.42 89.48 111.11 31. 36 4531. 24 2197.90 1611. 09 4221.02 4518.04 69.11 4.14 MWD GMAG
149 8697.97 89.07 114.26 30.55 4531.62 2227.06 1599.31 4249.21 4540.21 69.37 10.40 MWD GMAG
150 8729.75 88.93 115.34 31.78 4532.18 2257.73 1585.98 4278.05 4562.57 69.66 3.43 MWD GMAG
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 7 of 12
-------- ------ ------- ------ -------- -------- ---------------- ----------------- ------
-------- ------ ------- ------ -------- --------- ----------------- ---------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
--------- ------ ------- ------ -------- -------- ----------------- --------------- ------
-------- ------ ------- ------ --------- --------- ---------------- ----------------- ------
151 8761.18 88.93 115.60 31.43 4532.76 2288.14 1572.47 4306.42 4584.53 69.94 0.83 MWD GMAG
152 8792.70 88.66 115.44 31.52 4533.43 2318.66 1558.89 4334.86 4606.64 70.22 1. 00 MWD GMAG
153 8823.53 88.45 115.21 30.83 4534.21 2348.47 1545.71 4362.72 4628.45 70.49 1. 01 MWD GMAG
154 8854.68 90.23 116.92 31.15 4534.56 2378.70 1532.03 4390.69 4650.30 70.76 7.92 MWD GMAG
155 8885.79 91. 64 115.73 31.11 4534.06 2408.92 1518.23 4418.57 4672.13 71.04 5.93 MWD GMAG
156 8917.62 91. 47 116.20 31.83 4533.19 2439.79 1504.30 4447.18 4694.71 71.31 1. 57 MWD GMAG e
157 8948.92 91.30 116.94 31.30 4532.44 2470.23 1490.31 4475.17 4716.79 71. 58 2.43 MWD GMAG
158 8979.55 90.95 116.08 30.63 4531.83 2500.01 1476.64 4502.57 4738.52 71.84 3.03 MWD GMAG
159 9010.60 90.65 116.96 31. 05 4531.40 2530.20 1462.77 4530.35 4760.65 72.11 2.99 MWD GMAG
160 9043.12 89.45 118.97 32.52 4531.37 2562.00 1447.53 4559.07 4783.35 72.39 7.20 MWD GMAG
161 9072.47 88.93 121. 32 29.35 4531.79 2590.91 1432.79 4584.45 4803.13 72.64 8.20 MWD GMAG
162 9103.90 88.62 121. 17 31. 43 4532.46 2621.97 1416.49 4611.31 4823.97 72.92 1.10 MWD GMAG
163 9135.83 88.52 122.01 31.93 4533.26 2653.55 1399.77 4638.50 4845.11 73.21 2.65 MWD GMAG
164 9165.85 88.11 121. 39 30.02 4534.14 2683.24 1384.00 4664.03 4865.04 73.47 2.48 MWD GMAG
165 9197.24 88.18 120.73 31.39 4535.16 2714.23 1367.81 4690.91 4886.26 73.74 2.11 MWD GMAG
166 9227.70 88.21 121.37 30.46 4536.11 2744.30 1352.11 4716.99 4906.95 74.01 2.10 MWD GMAG
167 9258.03 88.35 119.56 30.33 4537.03 2774.20 1336.74 4743.12 4927.89 74.26 5.98 MWD GMAG
168 9290.81 89.48 118.69 32.78 4537.65 2806.39 1320.79 4771.75 4951.17 74.53 4.35 MWD GMAG
169 9322.07 91.91 118.70 31. 26 4537.27 2837.03 1305.78 4799.17 4973.64 74.78 7.77 MWD GMAG
170 9352.82 93.46 118.53 30.75 4535.83 2867.15 1291. 07 4826.13 4995.84 75.02 5.07 MWD GMAG
171 9384.91 93.53 118.02 32.09 4533.87 2898.51 1275.90 4854.34 5019.22 75.27 1. 60 MWD GMAG e
172 9415.98 93.12 119.08 31.07 4532.07 2928.91 1261.08 4881.58 5041. 84 75.52 3.65 MWD GMAG
173 9447.21 91. 54 118.80 31. 23 4530.80 2959.53 1245.98 4908.89 5064.55 75.76 5.14 MWD GMAG
174 9478.09 88.90 117.63 30.88 4530.68 2989.76 1231.38 4936.10 5087.37 75.99 9.35 MWD GMAG
175 9508.98 88.45 118.77 30.89 4531.39 3019.99 1216.79 4963.31 5110.29 76.23 3.97 MWD GMAG
176 9539.86 88.31 118.48 30.88 4532.27 3050.25 1202.00 4990.41 5133.13 76.46 1. 04 MWD GMAG
177 9571. 27 87.73 118.50 31. 41 4533.35 3081. 01 1187.02 5018.00 5156.48 76.69 1. 85 MWD GMAG
178 9601. 53 87.49 119.29 30.26 4534.61 3110.67 1172.42 5044.47 5178.92 76.92 2.73 MWD GMAG
179 9632.69 87.32 118.67 31.16 4536.02 3141. 23 1157.33 5071.70 5202.07 77.15 2.06 MWD GMAG
180 9663.94 87.59 119.37 31. 25 4537.41 3171.87 1142.19 5099.00 5225.36 77.37 2.40 MWD GMAG
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 8 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --....------------ ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
181 9694.77 87.18 119.20 30.83 4538.82 3202.14 1127.12 5125.86 5248.32 77.60 1.44 MWD GMAG
182 9726.19 87.12 119.27 31.42 4540.38 3232.96 1111. 80 5153.24 5271. 81 77.83 0.29 MWD GMAG
183 9757.56 87.18 119.39 31.37 4541. 94 3263.75 1096.45 5180.56 5295.32 78.05 0.43 MWD GMAG
184 9788.29 87.15 119.71 30.73 4543.46 3293.94 1081.31 5207.26 5318.34 78.27 1. 04 MWD GMAG
185 9819.56 87.94 120.06 31. 27 4544.80 3324.69 1065.75 5234.34 5341.74 78.49 2.76 MWD GMAG
186 9850.87 89.51 121. 40 31.31 4545.50 3355.58 1049.75 5261. 25 5364.95 78.72 6.59 MWD GMAG e
187 9881.79 90.27 120.86 30.92 4545.56 3386.13 1033.77 5287.72 5387.82 78.94 3.02 MWD GMAG
188 9912.65 89.21 120.25 30.86 4545.70 3416.57 1018.08 5314.29 5410.93 79.16 3.96 MWD GMAG
189 9943.81 88.72 120.59 31.16 4546.26 3447.29 1002.31 5341.16 5434.39 79.37 1.91 MWD GMAG
190 9974.53 88.52 120.96 30.72 4547.00 3477.61 986.59 5367.54 5457.46 79.58 1.37 MWD GMAG
191 10006.59 88.79 120.70 32.06 4547.75 3509.25 970.17 5395.07 5481.60 79.81 1.17 MWD GMAG
192 10037.57 88.55 121.61 30.98 4548.47 3539.85 954.14 5421.57 5504.89 80.02 3.04 MWD GMAG
193 10068.33 87.29 119.89 30.76 4549.59 3570.19 938.43 5447.99 5528.22 80.23 6.93 MWD GMAG
194 10099.46 86.46 119.55 31.13 4551. 28 3600.78 923.02 5474.98 5552.24 80.43 2.88 MWD GMAG
195 10130.47 87.87 121. 70 31.01 4552.82 3631.33 907.24 5501.63 5575.93 80.64 8.28 MWD GMAG
196 10161.25 88.69 121.12 30.78 4553.74 3661. 75 891.21 5527.89 5599.27 80.84 3.26 MWD GMAG
197 10192.30 89.68 119.99 31. 05 4554.18 3692.38 875.42 5554.62 5623.18 81.04 4.84 MWD GMAG
198 10223.23 89.58 119.92 30.93 4554.38 3722.83 859.98 5581. 42 5647.29 81. 24 0.39 MWD GMAG
199 10254.75 89.10 120.20 31.52 4554.75 3753.88 844.19 5608.70 5671.88 81. 44 1. 76 MWD GMAG
200 10285.04 90.30 121.54 30.29 4554.91 3783.78 828.65 5634.70 5695.30 81. 63 5.94 MWD GMAG
201 10316.50 91. 13 122.27 31. 46 4554.51 3814.93 812.03 5661.40 5719.34 81.84 3.51 MWD GMAG e
202 10346.85 91. 02 121.70 30.35 4553.94 3844.97 795.95 5687.14 5742.57 82.03 1. 91 MWD GMAG
203 10378.50 90.68 121.37 31. 65 4553.47 3876.28 779.40 5714.11 5767.02 82.23 1. 50 MWD GMAG
204 10409.36 90.75 122.62 30.86 4553.09 3906.83 763.05 5740.28 5790.78 82.43 4.06 MWD GMAG
205 10439.88 90.61 122.52 30.52 4552.73 3937.09 746.62 5766.00 5814.14 82.62 0.56 MWD GMAG
206 10470.89 90.16 121.85 31. 01 4552.52 3967.81 730.11 5792.24 5838.08 82.82 2.60 MWD GMAG
207 10502.40 89.69 122.16 31. 51 4552.56 3999.02 713.41 5818.96 5862.53 83.01 1. 79 MWD GMAG
208 10533.02 88.76 123.05 30.62 4552.97 4029.38 696.91 5844.76 5886.16 83.20 4.20 MWD GMAG
209 10564.03 89.14 127.49 31. 01 4553.54 4060.27 679.01 5870.06 5909.20 83.40 14.37 MWD GMAG
210 10595.33 89.68 127.73 31. 30 4553.86 4091.54 659.91 5894.86 5931.68 83.61 1. 89 MWD GMAG
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 9 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
211 10627.04 89.34 127.39 31.71 4554.13 4123.22 640.58 5919.99 5954.55 83.82 1.52 MWD GMAG
212 10658.20 88.90 128.03 31.16 4554.61 4154.35 621.52 5944.64 5977.04 84.03 2.49 MWD GMAG
213 10690.14 89.55 129.37 31.94 4555.05 4186.28 601. 56 5969.56 5999.80 84.25 4.66 MWD GMAG
214 10721. 53 90.27 131.51 31. 39 4555.09 4217.67 581. 20 5993.45 6021.57 84.46 7.19 MWD GMAG
215 10751.59 90.10 131. 53 30.06 4555.00 4247.72 561. 27 6015.96 6042.09 84.67 0.57 MWD GMAG
216 10782.38 88.45 131. 95 30.79 4555.39 4278.49 540.77 6038.93 6063.10 84.88 5.53 MWD GMAG e
217 10814.35 86.29 129.92 31. 97 4556.85 4310.42 519.85 6063.06 6085.30 85.10 9.27 MWD GMAG
218 10845.11 83.88 132.02 30.76 4559.49 4341.06 499.76 6086.19 6106.68 85.31 10.37 MWD GMAG
219 10876.17 83.54 131.13 31. 06 4562.89 4371.92 479.27 6109.29 6128.06 85.51 3.05 MWD GMAG
220 10907.24 83.74 131.16 31.07 4566.33 4402.79 458.96 6132.54 6149.69 85.72 0.65 MWD GMAG
221 10937.75 83.68 131. 58 30.51 4569.68 4433.11 438.91 6155.30 6170.93 85.92 1. 38 MWD GMAG
222 10968.51 83.60 130.74 30.76 4573.08 4463.67 418.79 6178.32 6192.49 86.12 2.73 MWD GMAG
223 11000.26 83.70 131.72 31.75 4576.60 4495.22 397.99 6202.05 6214.80 86.33 3.08 MWD GMAG
224 11030.10 82.88 132.52 29.84 4580.08 4524.83 378 .12 6224.03 6235.50 86.52 3.83 MWD GMAG
225 11060.81 82.81 133.25 30.71 4583.91 4555.27 357.38 6246.36 6256.57 86.73 2.37 MWD GMAG
226 11093.11 86.32 135.55 32.30 4586.97 4587.32 334.89 6269.32 6278.26 86.94 12.97 MWD GMAG
227 11123.24 87.59 136.36 30.13 4588.57 4617.24 313.26 6290.24 6298.04 87.15 5.00 MWD GMAG
228 11156.00 88.14 136.93 32.76 4589.79 4649.76 289.46 6312.71 6319.35 87.37 2.42 MWD GMAG
229 11186.56 91. 40 137.49 30.56 4589.91 4680.07 267.04 6333.47 6339.10 87.59 10.82 MWD GMAG
230 11216.83 92.67 134.73 30.27 4588.84 4710.15 245.24 6354.44 6359.17 87.79 10.03 MWD GMAG
231 11248.29 92.16 132.68 31. 46 4587.51 4741.51 223.52 6377.16 6381.08 87.99 6.71 MWD GMAG e
232 11280.02 92.94 128.57 31. 73 4586.10 4773.20 202.89 6401.21 6404.43 88.18 13.17 MWD GMAG
233 11310.85 91.54 127.38 30.83 4584.89 4803.99 183.93 6425.50 6428.13 88.36 5.96 MWD GMAG
234 11341. 87 91.06 128.37 31. 02 4584.19 4834.98 164.89 6449.98 6452.08 88.54 3.55 MWD GMAG
235 11372.69 91.19 128.88 30.82 4583.58 4865.79 145.66 6474.05 6475.69 88.71 1. 71 MWD GMAG
236 11404.34 90.34 128.04 31.65 4583.16 4897.42 125.97 6498.83 6500.05 88.89 3.78 MWD GMAG
237 11434.35 90.92 128.79 30.01 4582.83 4927.42 107.33 6522.34 6523.23 89.06 3.16 MWD GMAG
238 11465.92 92.43 131. 27 31.57 4581.91 4958.97 87.03 6546.50 6547.08 89.24 9.19 MWD GMAG
239 11497.03 91.98 133.43 31.11 4580.71 4990.03 66.09 6569.48 6569.81 89.42 7.09 MWD GMAG
240 11528.20 91.74 134.64 31.17 4579.70 5021.10 44.44 6591.87 6592.02 89.61 3.96 MWD GMAG
·
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 10 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
241 11559.77 91.16 135.00 31. 57 4578.90 5052.55 22.19 6614.26 6614.30 89.81 2.16 MWD GMAG
242 11590.62 91.81 134.26 30.85 4578.10 5083.29 0.53 6636.21 6636.21 90.00 3.19 MWD GMAG
243 11622.01 92.43 134.45 31. 39 4576.94 5114.57 -21.40 6658.64 6658.67 90.18 2.07 MWD GMAG
244 11653.65 92.43 133.82 31.64 4575.60 5146.10 -43.41 6681.32 6681. 46 90.37 1. 99 MWD GMAG
245 11685.79 92.02 133.40 32.14 4574.35 5178.15 -65.57 6704.58 6704.90 90.56 1.83 MWD GMAG
246 11 714 . 92 90.78 132.17 29.13 4573.64 5207.23 -85.35 6725.95 6726.49 90.73 5.99 MWD GMAG e
247 11746.56 87.83 130.57 31. 64 4574.02 5238.86 -106.25 6749.69 6750.52 90.90 10.61 MWD GMAG
248 11778.71 85.08 131.92 32.15 4576.01 5270.94 -127.41 6773.81 6775.01 91. 08 9.52 MWD GMAG
249 11808.50 84.84 132.83 29.79 4578.63 5300.58 -147.41 6795.73 6797.33 91. 24 3.15 MWD GMAG
250 11839.67 85.22 132.16 31.17 4581.33 5331. 61 -168.38 6818.63 6820.71 91. 41 2.46 MWD GMAG
251 11870.35 84.64 131. 86 30.68 4584.04 5362.15 -188.83 6841.34 6843.94 91.58 2.13 MWD GMAG
252 11901.17 85.33 133.03 30.82 4586.74 5392.82 -209.55 6863.99 6867.19 91.75 4.39 MWD GMAG
253 11934.41 86.12 132.80 33.24 4589.21 5425.93 -232.12 6888.27 6892.18 91.93 2.47 MWD GMAG
254 11965.63 85.81 132.73 31.22 4591. 41 5457.03 -253.27 6911.13 6915.77 92.10 1. 02 MWD GMAG
255 11997.37 85.50 132.32 31.74 4593.81 5488.65 -274.66 6934.45 6939.89 92.27 1.62 MWD GMAG
256 12028.08 84.64 131.22 30.71 4596.45 5519.23 -295.04 6957.27 6963.53 92.43 4.54 MWD GMAG
257 12059.16 85.08 132.10 31.08 4599.24 5550.17 -315.62 6980.40 6987.53 92.59 3.16 MWD GMAG
258 12090.10 87.94 131.51 30.94 4601.12 5581. 04 -336.20 7003.42 7011.48 92.75 9.44 MWD GMAG
259 12121.02 89.96 128.34 30.92 4601.69 5611.95 -356.04 7027.12 7036.14 92.90 12.15 MWD GMAG
260 12152.42 89.82 127.16 31. 40 4601.75 5643.32 -375.26 7051.95 7061.93 93.05 3.78 MWD GMAG
261 12183.21 89.24 126.96 30.79 4602.00 5674.07 -393.82 7076.52 7087.47 93.19 1. 99 MWD GMAG e
262 12214.26 88.48 126.57 31.05 4602.62 5705.06 -412.40 7101.39 7113.35 93.32 2.75 MWD GMAG
263 12244.29 89.35 128.14 30.03 4603.19 5735.06 -430.62 7125.25 7138.25 93.46 5.98 MWD Incl. Only
264 12275.23 89.89 129.75 30.94 4603.39 5765.99 -450.06 7149.32 7163.47 93.60 5.49 MWD GMAG
265 12307.82 89.21 128.61 32.59 4603.65 5798.57 -470.65 7174.58 7190.00 93.75 4.07 MWD GMAG
266 12338.38 88.21 126.83 30.56 4604.34 5829.10 -489.34 7198.74 7215.35 93.89 6.68 MWD GMAG
267 12369.81 88.93 127.87 31.43 4605.12 5860.49 -508.40 7223.72 7241. 59 94.03 4.02 MWD GMAG
268 12401.41 90.10 129.25 31. 60 4605.39 5892.07 -528.10 7248.43 7267.64 94.17 5.73 MWD GMAG
269 12432.16 90.03 13 0.18 30.75 4605.35 5922.82 -547.75 7272.08 7292.68 94.31 3.03 MWD GMAG
270 12463.25 89.27 129.14 31.09 4605.54 5953.91 -567.59 7296.02 7318.06 94.45 4.14 MWD GMAG
·
SCHLUMBERGER Survey Report 19-Apr-2004 10:24:01 Page 11 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
271 12494.97 89.79 129.01 31.72 4605.80 5985.63 -587.58 7320.64 7344.18 94.59 1. 69 MWD GMAG
272 12526.07 89.31 128.89 31.10 4606.05 6016.72 -607.13 7344.83 7369.88 94.73 1.59 MWD Incl. Only
273 12556.34 89.93 128.76 30.27 4606.25 6046.98 -626.11 7368.41 7394.96 94.86 2.09 MWD Incl. Only
274 12587.66 93.60 128.64 31.32 4605.28 6078.27 -645.68 7392.83 7420.98 94.99 11.72 MWD GMAG
275 12618.23 95.04 126.26 30.57 4602.98 6108.73 -664.21 7417.03 7446.71 95.12 9.08 MWD GMAG
276 12649.61 94.25 125.45 31. 38 4600.44 6139.92 -682.53 7442.38 7473.61 95.24 3.60 MWD GMAG e
277 12680.74 93.77 125.40 31.13 4598.26 6170.88 -700.53 7467.69 7500.47 95.36 1. 55 MWD GMAG
278 12711.97 93.19 123.58 31. 23 4596.37 6201.90 -718.18 7493.38 7527.71 95.47 6.11 MWD GMAG
279 12742.60 90.92 122.98 30.63 4595.27 6232.30 -734.98 7518.97 7554.80 95.58 7.67 MWD GMAG
280 12775.06 89.27 120.92 32.46 4595.22 6264.44 -752.16 7546.51 7583.90 95.69 8.13 MWD GMAG
281 12806.10 86.53 119.31 31. 04 4596.35 6294.99 -767.72 7573.33 7612.15 95.79 10.24 MWD GMAG
282 12837.10 87.32 121. 67 31.00 4598.02 6325.52 -783.42 7600.01 7640.28 95.89 8.02 MWD GMAG
283 12868.84 88.76 123.05 31.74 4599.10 6356.96 -800.40 7626.80 7668.69 95.99 6.28 MWD GMAG
284 12899.53 86.35 121. 25 30.69 4600.41 6387.33 -816.72 7652.76 7696.22 96.09 9.80 MWD GMAG
285 12930.78 85.98 120.92 31. 25 4602.50 6418.13 -832.81 7679.46 7724.49 96.19 1.58 MWD GMAG
286 12962.02 86.84 120.25 31.24 4604.46 6448.89 -848.68 7706.30 7752.89 96 .28 3.49 MWD GMAG
287 12991.90 86.63 120.86 29.88 4606.16 6478.32 -863.84 7731. 99 7780.10 96.37 2.16 MWD GMAG
288 13022.94 85.29 120.46 31. 04 4608.35 6508.87 -879.63 7758.62 7808.33 96 .47 4.50 MWD GMAG
289 13053.33 86.73 121.90 30.39 4610.46 6538.82 -895.33 7784.56 7835.88 96.56 6.69 MWD GMAG
290 13091. 95 88.83 120.89 38.62 4611.96 6576.98 -915.43 7817.50 7870.92 96.68 6.04 IMP None
291 13122.58 88.83 122.09 30.63 4612.58 6607.26 -931. 42 7843.62 7898.72 96.77 3.95 IMP None e
292 13154.46 89.31 122.19 31. 88 4613.10 6638.84 -948.38 7870.61 7927.54 96.87 1.54 IMP None
293 13186.07 89.07 121.34 31.61 4613.55 6670.12 -965.02 7897.48 7956.22 96.97 2.79 IMP None
294 13217.41 89.07 122.24 31.34 4614.06 6701.14 -981. 52 7924.11 7984.67 97.06 2.87 IMP None
295 13248.94 88.18 121. 43 31.53 4614.81 6732.34 -998.15 7950.89 8013.30 97 .16 3.82 IMP None
296 13278.92 88.32 121.12 29.98 4615.73 6761. 95 -1013.71 7976.50 8040.66 97.24 1.13 IMP None
297 13311.79 88.05 121.06 32.87 4616.77 6794.41 -1030.67 8004.64 8070.72 97.34 0.84 IMP None
298 13343.00 87.49 121. 65 31. 21 4617.98 6825.24 -1046.90 8031.27 8099.21 97.43 2.61 IMP None
299 13374.33 86.98 121.73 31. 33 4619.49 6856.21 -1063.34 8057.90 8127.75 97.52 1. 65 IMP None
300 13405.34 87.32 121.63 31.01 4621.04 6886.85 -1079.60 8084.25 8156.02 97.61 1.14 IMP None
·
SCHLUMBERGER Survey Report
19-Apr-2004 10:24:01
Page 12 of 12
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
301 13440.36 88.76 121. 38 35.02 4622.23 6921.47 -1097.89 8114.09 8188.03 97.71 4.17 IMP None
302 13490.00 88.76 121. 38 49.64 4623.31 6970.54 -1123.73 8156.46 8233.51 97.84 0.00 Projected To TD
[(c)2004 IDEAL ID8_1C_02J
e
e
e
e
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska! Inc. Dispatched To: Robin Deason
Well No L-201 L2 Date Dispatched: 12-Apr-04
Installation/Rig 11.1.1..1 Dispatched By: N. Rose
11.1 No Of Prints No of Floppies
Surveys
2
Received By:
ILJ O/kJ
'7 (VIo,> ~6-ð vi
Please sign and return to: James H. Johnson
BP Exploration (Alaska) Inc.
Petrotechnical Data Center (LR2-1)
900 E. Benson Blvd,
Anchorage, Alaska 99508
Fax: 907-564-4005
e-mail address:johnsojh@bp.com
LWD Log DeliveryV1.1, 10-02-03
ÀüU¡~GL1g
Schlumberger Private
.
.
FRANK H. MURKOWSKI, GOVERNOR
AI,~SIiA ORAND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE,SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska)Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe L-201L2
BP Exploration (Alaska) Inc.
Permit No: 204-048
Surface Location: 2598' NSL, 3588' WEL, SEC. 34, T12N, RIlE, UM
Bottomhole Location: 1551' NSL, 4559' WEL, SEC. 35, T12N, RIlE. UM
Dear Mr. Crane:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you ITom obtaining additional permits or approvals
required by law ITom other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well PBU L-201, Permit Number, 204-046,
API Number 50-029-23202. Production should continue to be reported as a function of the
original API number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission t witness any required test. Contact the
Commission's North Slope petroleum field inspecto t -3607 (pager).
ely,
BY ORDER OF THE COMMISSION
DATED this+- day of March, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
1a. Type of work 0 Drill
ORe-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. location of Well (Governmental Section):
Surface:
2598' NSl, 3588' WEl, SEC. 34, T12N, R11E, UM
Top of Productive Horizon:
4823' NSl, 544'WEl, SEC. 34, T12N, R11E, UM (OBa)
Total Depth:
1551' NSl, 4559' EWl, SEC. 35, T12N, R11E, UM
4b. location of Well (State Base Plane Coordinates):
Surface: x-583325 Y-5978321 Zone-ASP4
16. Deviated Wells:
Kickoff Depth 6354 ft Maximum Hole Angle 930
18.~~'i;~'s'
;;!;isiz8~';+ .....:, ..;'>
Hole Casing Weight
6-314" 4-1/2" 12.6#
I STATE OF ALASKA .
ALA í<A OIL AND GAS CONSERVATIO~OMMISSION
PERMIT TO DRILL
20 MC 25.005 I'.. '.. .... ..
1b. Current Well claÖ Stratigraphic Test 8 ~c:tory ~ g:~::~~~:g~~;;(S;~~~:ðr;~;c~
5. Bond: II Blanket 0 Single Well 11. Well Name and Number:
Bond No. 2S1OO302630-277 PBU L-201L2
6. Proposed Depth: 12. Field / PooI(s):
MD 13494 TVD 4636 Prudhoe Bay Field / Orion
7. Property Designation:
ADl ADl 028238/.% 8".2.3 <f
8. land Use Permit: 13. Approximate Spud Date:
March 13, 2004
14. Distance to Nearest Property:
5400'
f::
MAR 0 4 200/
alRedrill
9. Acres in Property:
2560
10. KB Elevation Planned 15. Distance to Nearest Well Within Pool
(Height above Gl): 78.7 feet l-119 is 350' away at top of OA
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 2140 psig Surface: 1680 psig
length
5668'
MD
6341'
TVD MD TVD (induding stage data)
4521' 13494' 4636' Uncemented Slotted liner
·..·.····.····~RçssN10W~CØNI)'T.QN§(Jt.1~Y.',ftô~ëPiñ~·fQ(·....~:)'B~:~).,.;t'¡'. ····,;.',.,;:.':ffiii:¡:. ,;,"';'
Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1 Junk (measured):
13632 4763 None 13632 4763 None
Casing length Size C$rnentVoIUrl1é .' MD TVD
Structural
Conductor
Surface
Intermediate
Production
liner
liner (OBb)
80'
3160'
7062
48"
10-3/4"
7-5/8"
260 sx Arctic Set (Approx.)
613 sx AS lite, 360 sx Class 'G'
578 sx Class 'G'
109'
3189'
7091'
109'
2639'
4686'
6541'
5668'
4-1/2"
4-1/2"
Uncemented Slotted liner
Uncemented Slotted liner
7091' - 13632'
6513' - 13536'
4686' - 4763'
4574' - 4657'
Perforation Depth MD (ft):
perforation Depth TVD (ft):
II Drilling Program 0 Time vs Depth Plot
o Seabed Report II Drilling Fluid Program
o Shallow Hazard Analysis
II 20 AAC 25.050 Requirements
20. Attachments 0 Filing Fee, $100 0 BOP Sketch
II Property Plat 0 Diverter Sketch
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
printed~ame ell Crane Title Senior Drilling Engineer
Prepared By NamelNumber:
Signatur ~ ~ Phone 564-4089 Date "3 - " -cy Terrie Hubble, 564-4628
Commission Use Only
Permit To Drill API Number: Permit Approval:? 0 ¡J See cover letter for
Number: <0 '" - <::::) Ýs? 50- c:> 2.. <7 - Z ~ 2. Ö 2.. - b / Date: C) Ð V-I other requirements
Conditions of Approval: Samples Required 0 Yes )rNo Mud log Required D Yes ~No
Hydrogen Sulfide Measures 0 Yes ~ No Directional Survey Required ~Yes 0 No
Other:·"\e.s t- p.> 0 f' E "3 S" 0 0 T' S ;' .
Date:
Contact Michael Triolo, 564-5774
DUPLICATE
BY ORDER OF
THE COMMISSION
~œ :ØL~
.
Well Plan Summary
Gwr Prudhoe Bay L-201 ML Permit
2,598' FSL, 3,588' FEL, Sec. 34, T12N, R11E
X = 583,325.34 Y = 5,978,320.84
J-.r:~ _- -~ .~ ..............~w_
4,813' FSL, 545' FEL, Sec. 34, T12N, R11E
X = 586,340.00 Y = 5,980,570.00 Z = 4,625' TVDss
1,562' FSL, 736' FEL, Sec. 35, T12N, R11E
X = 591,470.00 Y = 5,977,380.00 Z = 4,684' TVDss
:iIIIIi!IIIBIII ----~ --- ---- -""" ,-- .------------ on ----"'--------------~y¡¡ - -- ----=~;'":_;_;___:_;x.-~"'_n;__"
L-201 L 1 OBb Target Start: 5,067' FSL, 914' FEL, Sec. 34, T12N, R11 E
X = 585,967.46 Y = 5,980,820.14 Z = 4,504' TVDss
L-201 L 1 OBb Target End: 1,541' FSL, 696' FEL, Sec. 35, T12N, R11 E
X = 591,510.00 Y = 5,977,360.00 Z = 4,578' TVDss
___ ' ~ .--"'--'- ._-~---- ··--------~"-----~ß:TJ.t~:.:..:..T~,:.L~:·IR!;br"'.."_m
L-201 L2 OBa Target Start: 4,823' FSL, 544' FEL, Sec. 34, T12N, R11 E
X = 586,340.00 Y = 5,980,580.00 Z = 4,465' TVDss
L-201 L2 OBa Target End: 1,550' FSL, 720' FEL, Sec. 35, T12N, R11 E
. '!l'L'_""~':,~~C~~:2.~""'!,:=~~~.~7.71~"c,~"'~;~~,?: :rvD~s LJ
L-201 L3 OA Target Start: 5,222' FSL, 1,184' FEL, Sec. 34, T12N, R11E
X = 585,695.78 Y = 5,980,972.12 Z = 4,415' TVDss
3,090' FSL, 4,782' FEL, Sec. 35, T12N, R11 E
X = 587,405.00 Y = 5,978,860.00 Z = 4,150' TVDss
I Type of Well (producer or injector):
Surface Location:
(As-~take~)____"'__
L-201 OBd Target Start:
L-201 OBd Target End:
L-201 L3 OA Target End:
I AFE Number:
I ORD5M3543
I Schrader OBd, OBb, OBa and OA Multilateral Producer I
"n ~.Il!'Sw..wt,I:}i~_~
~!.1IT:.:;~~:t':'}f,~
KBE = 78.70'
I Rig: I Nabors 9ES
I Estimated Start Date: I March 13m 2004 I I Operating days to complete: 146.86
OBd MD 13,632' Well TVDrkb: TD 4,763' Max Inc. 93° KOP 300'
OBb MD 13,536' Well TVDrkb: TD 4,657' Max Inc. 92° KOP 6,526'
OBa MD 13,494' Well TVDrkb: TD 4,636' Max Inc. 93° KOP 6,354'
OAMD 9,668' Well TVDrkb: TD 4,444' Max Inc. 97° KOP 6,183'
Target Estimates:
Estimated Reserves OA I OBa I OBb I OBd:
Expected Initial Rate OA I OBa I OBb I OBd:
Expected 12 Month avg OA I OBa I OBb I OBd:
Current Well Information
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Original Well API #:
L-201 L1 API OBb #:
L-201 L2 API OBa #:
L-201 L3 API OA #.
Well Type:
Current Status:
H2S:
Expected reserves 6.90 mmbbl
Production rate: 4,950 bId
Production rate: 2,300 bId
5,400' MD from top OA to PBU boundary (this is the closest point
in the producing well section to any unit boundary)
Top OA: 350' away from L -119 top OA
TD: 2,270' away from L-210
50-029-XXXXX-00
50-029-XXXXX-60
50-029-XXXXX-61
50-029-XXXXX-62
Schrader O-sand Quadlateral Producer
New well, 20" X 34" insulated conductor to be set
o ppm from produced fluids (approximated to be around 10 ppm due to
contaminated gas lift gas)
Final Permit 3/4/04
·
G.er Prudhoe Bay L-201 ML Permit
OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's
OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's
OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's
OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's
84 of @ 4,400' TVDss (Estimated)
BHP:
BHT:
Mechanical Condition
Conductor:
Cellar Box Height:
Nabor 9ES:
20" X 34", 215.5Iblft, A53 ERW set at 109' RKB
Above MSL = 50.20'
KB I MSL = 78.70'
Materials Needed
¡1B.···.····.·······~I'~f..i·······lI_~t_'··· ····#'1·· ... 1~·I·I'^'···'þ"'i!iIIí¡W¡¡¡V··.F "1 .·!.~-"¡;'~Lr.íl·II·I"illi'II-"-".·· ". ·II·!··III··· ¡
=3" g~~,JUY. ,.,.... 'Þ'% JW,I:. ..[, ..¡g!IUlILl'J.,,,,,,,;JL. II ~m Jllllllm-.æ. 11m. I
3,190' 10-%",45.5#, L-80 BTC Casing (Burst: 5,210; Collapse: 2,470)
1 each 10-%", BTC Float Shoe and Float Collar
25 each 10-%" x 13-'W Bow Spring Centralizers
1 assembly FMC 11" 5m Gen 5 Wellhead System
1 lot 10-%" casing pups 5', 10', 20'.
1 each 1 0-%" TAM Port Collar
.......I1IIiII..llllBi:_:lf ·~'n..rr~TI '1~I_ 1[II.l]œm'~ w1fmm mnlf,
7,091' 7-%" 29.7# L-80 BTC-M Casing (Burst: 6,890; Collapse: 4,790)
1 each 7-%" BTC-M Float Shoe and Float Collar
75 each 7-%" x 9-%" Rigid Straight Blade Centralizers
20 each 7-%" Stop Rings
2 lots 7-%" casing pups 5', 10',20'
3 each 7-%" RA Tag
2 each 7-%" 29.7# L-80 BTC-M Casing Short Joint
;;;¡;ml~~'
4 x Production Liners:
1 .IfJlu.:;~,=i~~:,:D~' It~æ.1
24,300 4 *",12.6#, L-80, IBT-Mod Slotted Liner
607 each 4 *" x 5 %" x 8" Straight Blade Centralizers
4 each 7-%" x 4-*" Baker ZXP Liner Top Packer
4 each 4-*" Halliburton Float Shoes
3 assemblies Baker Level 3 Hookwall Hangers with LEM
lillli'¡¡:-
6,150'
1 each
1 each
1 each
1 each
2 each
1 each
4 each
1 each
6,150'
3 each
1 each
4-*", 12.6Ib/ft, L-80, BTC-M tubing
Baker PRM Production Packer 7-%" X 4-*"
11" X 4-*" FMC tubing hanger
4-1116", 5m Cameron Tree
Halliburton XN-Nipple (3.725" 10)
Halliburton X-Nipple (3.813" 10)
4-*" Baker CMD Sliding Sleeve
Cameo 4-*" X 1" KBG-2 Gas Lift Mandrels
Phoenix pressure gauge
I-wire for the Phoenix gauge
Half-muleshoed joint of 4-*" IBT-M tubing
4-*" WLEG
Surface and Anti-Collision Issues
~urface Shut-in Wells: L-119 will need to be shut-in for the rig move on and off L-201.
'::Iose Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile.
2
Final Permit 3/4/04
. G.er Prudhoe Bay L-201 ML Permit
~;=~Wiilii"~~ II~~~'_"~I~
L-21 0 30.13-ft 249.39-ft 26.01-ft Use Traveling Cylinder (Gyro)
L-120 47.06-ft 299.58-ft 42.05-ft Use Traveling Cylinder (Gyro)
L-103 30.23-ft 449.73-ft 23.14-ft Use Traveling Cylinder (Gyro)
L-119 17.33-ft 549.94-ft 8.43-ft Use Traveling Cylinder (Gyro)
Mud Program
13-~" Suñace Hole Mud Properties: I Spud - Freshwater Mud
Interval I Density (ppg) Funnel vis YP Tauo PH Plastic Vis
0-1,700 8.6-9.2 250-300 50-70 10-18 8.5-9.0 20-45
1,700-2,500 9.0-9.5 200-250 30-45 8-16 8.5-9.0 20-40
2,500-3,190 9.3-9.5 200 30-40 9-14 8.5-9.0 14-20
Interval Specific Maintain Viscosity greater then 250
Objectives: Ensure fluid loss below permafrost is below 6
WIn 0 " , ' " _w~_,.." ¡ ¡ . ,,,,,*,,,,,,~!int~i~ ~,u¡~,!:mfer~ture b:,lo~ 50° F ¡ '''La" "" .., '"
9-~." Intermediate Hole Mud Properties: I Freshwater Mud (LSNO) PH: 9.0 - 9.5
Interval I Density (ppg) Funnel vis I YP I Tauo I PV I API Filtrate I MBT
9.0-9.3 45-55 26-30 3-6 12-18 4-6 <20
Maintain proper fluid rheology & lubricant concentration to achieve the directional
requirements
Optimize mud rheology to maximize ROP while maintaining an ECO <0.7 ppg over
calculated clean hole.
Reduce shaker blinding while drilling the UGNU.
6-*" Production Hole Mud Properties: I LVT-2oo MOBM (Versa-Pro)
Interval I Density (ppg) Stability I YP I Oil: H20 Ratio I PV I API Filtrate I MBT
9.2 650 - 900 18 - 25 80 : 20 15 - 20 4 - 5_5 < 6
Minimize solids/liquid invasion by maintaining optimum P50 of bridging agents.
Maintain minimal ECO's by reducing drill solids accumulation through utilization of
the rigs solids control system and effective dilution.
FL
NC-8
8
5.5-8
Interval Specific
Objectives:
Interval Specific
Objectives:
Well Control
Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will
be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below,
BOP equipment will be tested to 3,500 psi.
Oiverter, BOPE and drilling fluid system schematics are on file with the AOGCC.
Production Section-
· Maximum anticipated BHP: 2,140 psi @ 4,600' TVOss (8.90 ppg EMW). Actual from L-120 MDT's
· Maximum suñace pressure: 1,680 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
3,500 psi (7-%" casing will be tested to 3,500 psi)
Estimated 9.2 ppg Brine /6.8 ppg Diesel
¡ ~. ~,:::l.3iMI~.'fS~~~~ r
5,000 psi Working Pressure 3,500/250 psi Rams & Valves
(entire stack and valves 3,500/250 psi Annular
Disposal
· NO ANNULAR INJECTION ON THIS WELL.
· No annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at 05-04. Any
metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to 05-04 for injection. Haul all
Class I waste to Pad 3 for disposal.
3
Final Permit 3/4/04
· ~er Prudhoe Bay L-201 ML Permit
Formation Markers
1111I'11»".»1:' ~ !1"_,L1*~
SV5 1,475 1617 675 8.8 No
SV4 1,600 1766 730 8.8 No
Base Permafrost 1,680 1866 770 8.8 No
SV3 1,960 2245 890 8.7 Poss. Gas Hydr.
SV2 2,130 2509 960 8.7 Poss. Gas Hydr.
SV1 2,460 3031 1,120 8.8 Poss. Gas Hydr.
UG4 2,750 3490 1,255 8.8 Yes - Heavy Oil
UG4A 2,785 3546 1,270 8.8 Yes - Heavy Oil
UG3 3,150 4123 1,420 8.7 Yes - Heavy Oil
UG1 3,500 4672 1,600 8.8 Yes - Heavy Oil
Ma 3,960 5379 1,820 8.8 Yes - Heavy Oil
Mb1 4,000 5444 1,825 8.8 No - Wtr
Mb2 4,080 5578 1,830 8.6 No - Wtr
Mc 4,155 5710 1,845 8.5 No - Wtr
Na 4,200 5793
Nb 4,230 5850 1,890 8.6 No - Wtr
Nc 4,275 5940
OA 4,370 6151 1,970 8.7 Yes
OBa 4,440 6226 2,000 8.7 Yes
OBb 4,490 6494 2,060 8.8 Yes
OBc 4,545 6734 2,110 8.9 Yes
OBd 4,600 7051 2,140 8.9 Yes
TO (OBd) 4,684 13,632 2,168 8.9 Yes
Casing/Tubing Program
48" 20" X 34" 215.5# A53 Welded 80' 29' /29' 109' /109'
13-%" 10-%" 45.5# L-80 BTC 3,160' 29' /29' 3,189' /2,639'
9-%" 7-%" 29.7# L-80 BTC-M 7,062' 29' /29' 7,091' /4,686'
6-3,4" OBd 4-%" slotted 12.6# L-80 IBT 6,541' 7,091' /4,686' 13,632' /4,763'
6-3,4" OBb 4-%" slotted 12.6# L-80 IBT 5,668' 6,513' /4,574' 13,536' / 4,657'
6-3,4" OBa 4-%" slotted 12.6# L-80 IBT 5,668' 6,341' / 4,521' 13,494' / 4,636'
6-3,4" OA 4-%" slotted 12.6# L-80 IBT 3,729' 6,170' / 4,456' 9,668' /4,444'
Tubing 4-%" 12.6# L-80 IBT-M 6,121' 29' /29' 6,150' / 4,454'
Cement Calculations
Casing Size 110-% -in 45.5-lblft L-80 BTC surface casing
Basis 250% excess in permafrost. 30% excess below permafrost. Top of tail cement 800' MD above shoe
Total Cement Vol: Wash 2Q-bbl CW Spacer
Spacer 70-bb11 0.1-lb/gal MudPush spacer
Lead 468-bbl, 613-sx 10.7-lb/gal ASL - 4.28 felsx
(cement to surface)
Tail 75-bbl, 360-sx 15.8-lb/gal Premium G - 1.17 fta Isx
,_"_,"w.""~~~e"2!"!!~:!=~~_~~w_",.,~",*"""",,,,,,-,,,__"'''''<'''''=''''''h='_'_'*'''__' ~-
Temp I BHST == 55°F from SOR, BHCT 60°F estimated by Dowell
In the event that cement is not circulated to surface during the initial surface casing cement job, notify the
AOGCC of the upcoming remedial cement work for possible witness of cement to surface.
4 Final Permit 3/4/04
· Ger Prudhoe Bay L-201 ML Permit
Casing Size 17-% -in 29.7-Iblft L-80 BTC-M intermediate casing
Basis Top of tail cement 700-ft MD above top of Schrader Ma-sand. 30% excess over gauge.
Total Cement Vol: Wash 25-bbl Water
Spacer 45-bbI10.3-lb/gal MudPush Spacer
Tail 124 bbl, 578-sx 15.8-lb/gal Premium - 1.20 ft;'/sx
to of tail at 4,679-ft MD To Ma: 51379' MD
^_______~#~7/d::;:;;w;,';;;,,:"";,,::~w_"':>m:;z""'..;..:<_~=;,,:"';;_;v
Temp BHST == 120°F from SOR, BHCT 90°F estimated by Halliburton
1~" Casing Centralizer Placement
a) Run (25) 9-%" Bow-spring centralizers attached over the collar of each joint of casing from the casing
shoe up to 2,189' MD (1,00' MD above the shoe).
b) This centralizer program is subject to change pending actual hole conditions.
7-%" Casing Space Out
a) Space 7-%" casing out with pups and long/short joints as required to place the top of a long full joint - 5-
15' above the top of the OBb, OBa and OA sands to allow for the window to be milled just below the top
of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance
reservoir contact depending on the angle of intersection of each zone.
b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth
except on the OBd lateral. It will need to be placed 120' above the casing shoe.
c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out.
7-%" String Centralizer Placement
a) Centralizer size: 7-%" X 9-Yá" (this is different then the norm of W under gauge hole)
b) Do not run centralizers on the window joints spaced at the top of each sand.
c) Place 2 rigid straight blade centralizers back to back at the very bottom of the shoe joint. Do not run any
centralizers on the next two full joints.
d) With the exception stated above, alternate 1 rigid straight vane cenralizer floating across a full joint and
2 rigid straight vane centralizers, one floating on the upper half of the joint and one floating on the lower
half of the joint separated by a stop collar up to ±5,830' MD (320' MD above the top OA sand). Then
continue with 1 rigid straight vane centralizer per joint floating to 4,600' MD (780' MD above Ma sand).
Zonal isolation with cement is required between the OA and the Nb sands due to the presence of water
in the Nb sand. The centralizer program is subject to change pending modeling and hole conditions.
4 W' Solid Liner Centralizer Placement
a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking
is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop
collar. Do not put any centralization on the first two joints above the bent joint.
Survey and Logging Program
13-1h" Hole Section: Surface Gyro if needed (have discussion with ODE on photo or E-line Gyro)
Open Hole Drilling: MWD I GR
Cased hole: None
9-%" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only)
Open Hole: None
__-2s,:~, Ho~~,;,. "~~!!'M~~?~'~?~ {~~I!¡~~"c.?n~~~¡;~~~,,!~~;,~~~",!,j.?b)m¡,,_,____~_.,",..,~.'>_
~" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (DenlNeu recorded only) I AIM I PWD
Cased Hole: None
5
Final Permit 3/4/04
· Wer Prudhoe Bay L-201 ML Permit
DrillinQ Hazards and ContinQencies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Schrader in this fault block is expected to be underpressured based on the MDT samples.
a. OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's
b. OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's
c. OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's
d. OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's
II. Hydrates and Shallow gas
A. Gas hydrates are present below L-pad, but have not been a significant issue thus far during L-Pad drilling. If
hydrates are encountered follow the recommended practice and apply good drilling operational practices.
III. Lost Circulation/Breathing
A. Lost circulation is unlikely within the Schrader interval.
B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee.
IV. Kick Tolerancenntegrity Testing
A. The 10-%" casing will be cemented to surface.
B. The 7-%" casing will be cemented with 15.8 Ib/gal tail cement to 700' MD above the Ma sand -4,680' MD.
C. The Kick Tolerance for the surface casing is 52.7 bbls with 9.2 ppg mud, 11.4 ppg LOT, and an 8.9 ppg pore
pressure (most likely 8.9 ppg based on recent MDT's within the block). If the LOT is less then 11.4 ppg EMW,
then the kick tolerance will be < 50 bbls.
D. The Kick Tolerance for the production hole laterals is infinite with 9.2 ppg mud, 12.0 ppg FIT, and an 8.9 ppg pore
pressure. If the FIT is less then 12.0 ppg EMW notify the ODE to have conversation on how to deal with
potential ECD concerns around the casing exit points.
E. Integrity Testing
V.
···"~lrlJø.
1 O-%-in Window
7 -%-in Shoe
7-% -in Window
7-% -in Window
7-% -in Window
1_,U¡~î~~;:tÁ¡íÌ;..""M.~"'}.
20-ft min new formation below shoe LOT 11.4 minimum
20-ft min new formation below shoe FIT 12.0 minimum
20-ft minimum from top window FIT 12.0 minimum
20-ft minimum from top window FIT 12.0 minimum
20-ft minimum from top window FIT 12.0 minimum
Stuck Pipe
A. We do not expect stuck pipe.
B. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners
moving as much as possible and run one centralizer per joint to help with standoff.
VI. Hydrogen Sulfide
A. L-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be
followed at all times. Recently 10 ppm of H2S has been measured at L-Pad from all wells tested as recently as
January 2003 with hand held H2S meters. This is as a result of H2S being transmitted by shared gas lift gas and
not produced from L-Pad. There has been no seawater injection at L-Pad to date.
VII. Faults
There are four visible faults to cross while drilling the well. It is possible to encounter sub-seismic faults along the
proposed well path. In the production hole sections, if a fault throws us out of section steer up as fast as possible
to determine where we are within the section. This will make it easy to lows ide OH sidetrack to get back on
course.
Fault #1 :
Fault #2
SV6
UG1
1,090' MD
5,190' MD
1,000' TVDss
3,840' TVDss
80' West throw
40' Southwest throw
CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
6
Final Permit 3/4/04
· G.er Prudhoe Bay L-201 ML Permit
Drill and Complete Procedure Summary
Pre-Ri2 Work:
1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5
Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and
production simops.
Drillinq Riq Operations:
1. MIRU Nabors 9ES Nipple up diverter spool and riser. Function test diverter. PU 4,200' of 5" DP as required and stand
back in derrick (this will enable both holes to be drilled without changing the DP handling equipment in open hole).
2. MU 13-*" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,189' MD 12,639' TVD.
The actual surface hole TO will be +1-100' TVD below the top of the SV1 sand.
3. Run and cement the 10-3,4",45.5# L-80 surface casing back to surface. Will use TAM collar as contingency only.
NO drilling spool and riser and NU casing 1 tubing head. NU BOPE and test to 3,500 psi.
4. MU 9-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at ±800' from the
bit in the HWDP section and RIH PU 4" DP to float collar. Test the 10-3,4" casing to 3,500 psi for 30 minutes.
5. Drill out shoe track. Circulate and condition mud. Displace well to new LSND drilling fluid. Drill 20' of new formation
below rathole and perform a LOT. Directionally drill ahead to TD (Topset the OBd) as per directional profile to 7,091'
MD 14,686' TVD.
6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TO. Make sure hole is clean
prior to POOH. POOH laying down the 5" DP and standing back the 4" DP, LD drilling BHA. Retrieve bowl protector.
7. MU and run 7-%" 29.7# L-80 BTC-M long string casing to TO. Cement in one stage to 700' MD above the Schrader
Ma sand. Bump plug with seawater. Land casing on mandrel hanger.
8. Clean pits for displacement. Freeze protect 7-%" x 10-3,4" annulus with dead crude to 2,200' TVD.
9. PU 6-%" Powerdrive RSS or conventional assembly with MW DIG R/Resl Azimuthal Den /Neu/PWD and RIH to the
float collar picking up 4" DP on the way. Test the 7-%" casing to 3,500 psi for 30 minutes.
10. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new
formation below rathole and perform an FIT to 12.0 ppg EMW. Directionally drill ahead to TO geosteering through the
OBd to TO at 13,632' MD 1 4,763' TVD (prognosed). Perform wiper trip, circulate and condition mud.
11. POOH to near OBb window depth, log into top OBb and OBb RA marker with GR, log across the OBa and OA
windows as well. POH LD drilling assembly.
12. MU and run 4-*" 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TO. Position liner top packer 100'
below OBb window.
13. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is
near the top of the OBb sand (planned window exit: 6,501' MD). Orient whipstock to highside. Shear off Whipstock &
mill window. Perform FIT to 12 ppg EMW. POOH
14. RIH with 6-3,4" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock.
Directionally drill to 6-%" TO. Planned TO is 13,536' MD. Circulate and condition mud and perform wiper trip. POOH.
15. Pull whipstock #1. Run and set 4-*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker
Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, circulate and condition mud, POOH
16. PU the 7-%" whipstock assembly. Set the whipsock on the OBb liner top packer such that the top of the window is
near the top of the OBa sand (planned window exit: 6,329' MD). Orient whipstock to highside. Shear off of Whipstock
and mill window. Perform FIT to 12 ppg EMW. POOH
17. RIH with 6-%" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock.
Directionally drill to 6-3,4" TD. Planned TD is 13,494' MD. Circulate and condition mud and perform wiper trip. POOH.
18. Pull whipstock #2. Run 4-*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook
Hanger Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools.
19. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is
near the top of the OA sand (planned window exit: 6,158' MD). Orient whipstock to highside. Shear off of Whipstock
and mill window. Perform FIT to 12 ppg EMW. POOH
20. RIH with 6-3,4" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock.
Directionally drill t9 6,:~ATD. Planned TD is 9,668' MD. Circulate and condition mud and perform wiper trip. POOH.
.1. Pull whipstock ttz.~Ifùn"4-*" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook
Hanger Lateral Entry Module #2 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL
brine. POOH.
7
Final Permit 3/4/04
· eer Prudhoe Bay L-201 ML Permit
22. MU 4-%" 12.6# BTM-M, L-80 completion assembly and RIH. See completion schematic for details. land tubing
hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus.
23. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to
3,500 psi. Shear DCK-1 valve.
24. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi.
25. Pull two-way check. Freeze protect the well to 2,200' TVD. Install VR plug in 7_%" casing annulus valves.
26. Install BPV. Secure the well and rig down I move off Nabors-9ES.
8
Final Permit 3/4/04
POST RIG - COMPLEIN TREE: FMC 4-1/16" 5M
L-201, L 1, L2, & L3 WELLHEAD: FMC Gen 5 System
11", 5M csg.head wI?" mandrel hanger & packoff
111:( ~~: ~ 1~;ii-~~~~~g s:~~:: with control line ports
it'(' 11" X 4-1/16" Adaptor Flange
,!~ 20" X 34" 215.5 tblll, A53 ERW I"mlated I 109'
~::;:: ~:~:::~:,:D) 2,200'1VD
.
I Orig KB elev (N-9ES) = 28.5' I
AI
.-
Junction Specifications:
Junction JO through LEM
Module without diverter: 3.65"
~ 1 0w3/4", 45.5# L-80 BTC Csg @ 3,197' MD
Phoenix
Pressure
Gauge
with control
lines to surface
-5/8" X 5-1/2" Baker PRM Packer
4-1/2", 12.6 Iblft, L-80, BTC-M
Coupling 00: 5.2"
OriftllD: 3.833"/3.958"
4.5" Baker sliding sleeve with 3.813" ID
4.5" WlEG I 6,128' MD I
9.2 PPG Versapro MOBM below Completion
6-3/4" OA Lateral 16,158'-9,668' I
7-5/8",29.7#, L-80, BTC-M
Casing Drift: 6.75"
Casing 10: 6.875"
6-3/4" OBa Lateral 16,329'-13,494'1
........::~-:::,~:.:::....-_....._-~>:.::~::::::....- --...-....:,:.:,~-- ---fi,--
....:_....-::..~':':....-:::....:_:-:._.:',.tI!IIII:::- ::-.- - __:::_ ...:::.....', ,Li;:,-è*:~
.__ ... ._._..._~. _. .. . __: _ m__. ...,___ ___ .... _~... :';."
Baker Hughes HookwaU Hanger @ 6,148' MD
Window in 7-5/8" casing@ 6,158' MD
Well Inclination @ Window = 66°
Baker Hughes Hookwall Hanger@ 6,319' MD
Window in 7-5/8" casing@ 6,329' MD
Well Inclination @ Window = 70°
Baker Hughes Hookwall Hanger@ 6,491' MD
Window in 7-5/8" casing@ 6,501' MD
WeUlnclination @ Window = 74°
6-3/4" OBb Lateral6,501 '-13,536'1
7-5/8" Casing Shoe @ 7,091' MD
\I
6-3/4"OBd Lateral 17,091'-13,6321
DATE
REV. BY
COMMENTS
G~~1v
API NO: 50-029-xxxxx-OO
50-029-xxxxx-60
SO-029-xxxxx-61
SO-029-xxxxx-62
ORION
WELL: L-201 ML
31412004
MIK TRIOLO
Level 3 Multi-lateral, 4-112" GL Completion
I
-~--
I
.
PLANT
) 15'00'00·
GRID
L-111i.
L-114.
L-SD ·
L-121 ·
L-110.
L-SI ·
L-116 .
L-109 .
¡ L-SL ·
I L-OI ·
L-107 .
L-108i.
L-105i.
L-106 .
L-104 .
S-W ·
L-102 .
/1) ç
~
~I
~>M~
.
33 '
~34 -,¡§.
, I
L-PAD ,'Co '/,
PROJECT ' " ':~' T12N
AREA T11N
w
L-PAD
"
. N-L (NWE-1)
2
¡¡;:
4
.~
" ,
~. "', --r...
; ."
, - V-'-...
· N-A (NWE-2)
· L-113
· L-112i
· L-02
· L-122
VICINITY MAP
N.T.S.
LEGEND
-+ AS-BUILT CONDUCTOR
. EXISTING CONDUCTOR
· L-115i
· L-117
· L-118
· L-103i
I~
L- 201 t
L-119i
L-21Oi
L-120
~~\!«X:I
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF DECEMBER 18, 2003,
~
NOTES
1. DATE OF SURVEY: DECEMBER 18, 2003.
2. REFERENCE FIELD BOOK: WOO3-14 PAGES 37-38.
3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27.
GEODETIC POSITIONS ARE NAD 27.
4. BASIS OF HORIZONTAL LOCATION IS L-PAD OPERATOR
MONUMENTATlON.
5. BASIS OF ELEVATION IS L-PAD OPERATOR MONUMENTS.
ELEVATIONS ARE BP MSL DATUM.
6. MEAN PAD SCALE FACTOR IS 0.999907827.
LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N.. R. 11 E., UMIAT MERIDIAN. ALASKA
WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION
NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS
L-201 y= 5.978.320.84 N= 10,000.09 70'21'02.654" 70.3507372' 502' 2.598' FSL
x= 583,325.34 E= 5,340.15 -149'19'24.511" -149.3234753' . 3,588' FEL
y= 5,978,328.65 N= 10,000.14 70'21'02.727" 70.3507575' 50.8' 2.605' FSL
L-21Oi x= 583,354.28 E= 5,370.13 -149'19'23.663" -149.3232397' 3,559' FEL
o 12/111/03 ISSUEO FQR lNf'ORN"lION
NO. DAlE RE\1SIOH
1ffi~' DRA~: ObP
JACOBS
CHECKED: O'HANLEY
DATE; 12/19/03
DRA'MNG: GPB WOA l-P AD SHEET:
FRB03 WOI. 02-00
~ ff]~~[JJ(~O JOB NO:
SCALE: AS-BUILT CONDUCTORS
OIOIIoIŒItSAfIOlAIIO~ 1 OF 1
JJ LOH 10'1 CST rw.au I..-t I". 130' WELLS L-201 &: L-210i
BY Q( ............. ..-. ....,
Ò L-201 L2 (P3) Proposal Schlumberger
Report D..: January 9. 2004 Survey I DLS Computation Method: Minimum Curvature 1 Lubinski
Client: BP exploration Alaska Vtrtlc.1 SaotIon Azimuth: 130,000'
Flald: Prudhoe Bay Unit - WOA ~04 Vtrtlcal SteIIon Drlgln: N 0,000 It. E 0,000 II
Structural Slot: L-PAD / Plan L-201 (N-U) d 03/0^ TVO Rtftronca Datum: Rotary Table
wtß: Plan L-201 (N-U) TVO Rtftl'tnCl EIeVlllon: 78,70 II relatiVe to MSL
BorthoI.: Plan L-201L2 OBa APprove Sa. Bod I Ground Lovot Eltvatlon: 50.20 II relatiVe to MSL
UWIIAPW: 50029 Magnatie DecHnatIon: 25,027'
Survey Nam.' Do.: L-201L2 (P3) OBa / January 9. 2004 Total Field Strtngth: 57559,384 nT .
Tort I AHD DDtI ERD 11IIo: 248.153' 16759,3111/7,083/3,615 Magnttlc Dip: 80,822'
Grid Coordlnata Syttam: NAD27 Alaska State Planas, Zone 04. US Feet Declination Data: 2(»Aar-04
location LlllLono: N 70,35073717. W 149,32347531 Magnatlc Decnnatlon Modot: BOOM 2003
Location Grid HIE YfX: N 5978320,840 flUS, E 583325,340 flUS North Rtftrtnca: True North
Grid Convargonca Anglo: +0,63713312" Total Corr Mag North.. TM North: +25.027'
Grid Scalo Factor. 0,99990789 Local Coordln"" Rtftl'tncod To: Wen Head
I Commtntl I~I Inclination I Azimuth I TVO I sU~TVOI VtrtlClI I Along Holt I NS EW I DLS I Bulld~. I W.Uata I Tool F.et I Northing Eating Latltudt Longltud.
SteIIon Dtpartul't
(dog) (dog) (It) (It) (It) (It) (It) (It) (dag/I00It) (dogl100lt) (dog/loolt) (dog ) (ItUS) (flUS)
Top Whipstock 6329,00 69.65 109.43 4516,68 4437,98 -105,39 3966.73 2731.77 2154,66 4.00 2.39 3.43 30.00G 5981076.15 585449.29 N 70,35819927 W 149,30597722
Base Whipstock 6341,00 71.31 110,44 4520,69 4441,99 -94,77 3978.04 2727.92 2165,29 16,00 13,88 8,44 O.ooG 5981072,41 585459.96 N 70,35818873 W 149,30589088
KOP Crv 10/100 6354.00 71.31 110.44 4524,86 4446,16 -83,16 3990.36 2723,62 2176.83 0.00 0.00 0,00 29.10G 5981068.24 585471.54 N 70.35817697 W 149,30579718
6400,00 75.35 112.75 4538.06 4459,36 41,36 4034.42 2707.40 2217.79 10.00 8,77 5.02 28.43G 5981052.47 585512.68 N 70.35813262 W 149,30546460
6500,00 84.18 117,52 4555,82 4477,12 53,65 4132,72 2665.60 2306,74 10.00 8.83 4,77 27.58G 5981011,67 585602.08 N 70.35801837 W 149,30474233
90'PI 6565.60 90,00 120.55 4559. 15 4480.45 117,93 4198.21 2633.82 2363,99 10,00 8,87 4.62 27.43G 5980980,53 585659.67 N 70,35793149 W 149,30427749
End Cry 6578.25 91.12 121.13 4559.03 4480,33 130.42 4210.86 2627.34 2374.84 10,00 8.88 4.61 O.OOG 5980974,17 585670.60 N 70.35791378 W 149,30418934
Cry 6/100 7339,46 91.12 121.13 4544,13 4465.43 882,39 4971,93 2233,85 3026.30 0,00 0.00 0,00 -22.39G 5980587,99 586326.33 N 70,35683817 W 149,29890017
L-201L2 Tgt 2 OBa 7355,30 92.00 120.77 4543,70 4465,00 898.02 4987,76 2225,71 3039.88 6,00 5.55 -2.29 -22.72G 5980580.00 586340,00 N 70,35681591 W 149.29878994
End Cry 7376.85 93.19 120.27 4542.72 4464,02 919.26 5009,29 2214.78 3058.43 6.00 5.53 -2,32 O.ooG 5980569.28 586358,67 N 70,35678602 W 149,29863935
Cry 6/100 7591.97 93.19 120.27 4530,74 4452,04 1130.96 5224,08 2106.51 3243.93 0,00 0,00 0,00 116.11G 5980463.09 586545.34 N 70,35649003 W 149,29713337
7600.00 92,98 120.70 4530.31 4451.61 1138.86 5232,09 2102.44 3250.84 6,00 -2.64 5,40 116,13G 5980459.10 586552.29 N 70,35647891 W 149,29707730 .
L-201L2 Tgt 3 OBa 7637.05 92,00 122.70 4528,70 4450,00 1175,49 5269.11 2082.99 3282.33 6,00 -2.65 5,39 115,79G 5980440,00 586584.00 N 70,35642574 W 149,29682163
End Cry 7677.80 90.94 124,90 4527,66 4448,96 1215,98 5309,84 2060.33 3316,17 6,00 -2.61 5.40 O,ooG 5980417.72 586618.09 N 70,35636380 W 149,29654690
Cry 6/100 8001.25 90,94 124.90 4522.38 4443.68 1538.10 5633,24 1875.29 3581.41 0,00 0.00 0.00 -90,01G 5980235,66 586885.34 N 70,35585795 W 149,29439379
8100,00 90.93 118,98 4520.77 4442.07 1635,83 5731.99 1823.08 3665,17 6.00 -0,01 -6.00 -90,10G 5980184.39 586969.67 N 70,35571521 W 149,29371389
L-201L2 Tgt 4 OBa 8166.24 90.92 115,00 4519,70 4441.00 1700.35 5798.22 1793,03 3724,18 6.00 -0,01 -6.00 -90,05G 5980155,00 587029,00 N 70.35563303 W 149,29323485
8200.00 90.92 112,97 4519.16 4440,46 1732,79 5831.97 1779,31 3755.01 6.00 -0.01 -6.00 -90.08G 5980141,62 587059.98 N 70.35559550 W 149,29298451
8300.00 90,90 106,97 4517,57 4438,87 1826,69 5931,96 1745.17 3848.94 6.00 -0.01 -6,00 -90.18G 5980108,53 587154.28 N 70,35550211 W 149,29222194
End Cry 8326,76 90,90 105,37 4517,15 4438.45 1851.16 5958.72 1737.72 3874.64 6.00 -0.02 -6.00 O.OOG 5980101,37 587180.05 N 70.35548172 W 149,29201331
Cry 6/100 9031,73 90.90 105.37 4506.09 4427.39 2491.90 6663,60 1550.91 4554.32 0.00 0.00 0,00 94,82G 5979922,15 587861.71 N 70.35497034 W 149,28649523
9100,00 90.55 109,45 4505.22 4426,52 2554.92 6731.86 1530.50 4619.44 8.00 -0,51 5.98 94,88G 5979902.46 587927.05 N 70,35491445 W 149,28596656
9200.00 90.04 115.43 4504,70 4426.00 2650,21 6831.86 1492.34 4711.83 6,00 -0,51 5.98 94,91G 5979865.34 588019.84 N 70,35481006 W 149,28521661
L-201 L2 Tgt 5 OBa 9207.90 90,00 115.90 4504.70 4426.00 2657.86 6839.76 1488,92 4718,95 6,00 -0.51 5,98 96,83G 5979862,00 588027.00 N 70,35480070 W 149.28515880
9300.00 89,34 121.39 4505.23 4426,53 2748.12 6931.86 1444.79 4799.75 6,00 -0.71 5.98 96,80G 5979818,77 588108,27 N 70,35468000 W 149.28450300
9400.00 88.84 127,35 4506.99 4428,29 2847.58 7031.84 1388.38 4882.24 6,00 -0.71 5.96 96,69G 5979763.29 588191,38 N 70.35452574 W 149,28383347
9500.00 87.95 133,31 4509.97 4431.27 2947.49 7131.80 1323.72 4958.41 6,00 -0.69 5.96 96,52G 5979699,49 588268,26 N 70.35434897 W 149,28321537
End Cry 9527.80 87.76 134,97 4511,01 4432,31 2975.20 7159,58 1304.38 4978,34 6.00 -0,66 5.97 O.OOG 5979680.37 588268,40 N 70,35429608 W 149,28305360
Cry 6/100 9594.34 87.76 134,97 4513,62 4434,92 3041,44 7226,07 1257,39 5025.39 0,00 0.00 0.00 -94.79G 5979633,91 588335,96 N 70.35418763 W 149.28267189
9600.00 87.73 134.63 4513.84 4435,14 3047.07 7231.72 1253.40 5029,40 6,00 -0,50 -5.98 -94.78G 5979629,97 588340.02 N 70,35415674 W 149,28263934
Well Design Ver 3,1 RT -SP3,03-HF2,03 Bld( d031 rt-546 ) Plan L-201 (N-U)IPlan L-201 (N-U)IPlan L-201L2 OBaIL-201L2 (P3) OBa Generated 3/412004 8:58 AM Page 1 of 2
Commonto I Me: I Inclination I AzImuth I TVD I Sub-S.. TVD I V.rtlcal I A~gH~ I NS EW I DLS I Bu~~ I W..~ I Too/F... I NorthIng Eatting LItItudo Longllud.
SocIIon Dopartu..
(II) (dog) (clog) (II) (It) (II) (It) (It) (II) (dog/1001t) (cIog/1ooll) (cIog/1ooft) (dog ) (IIUS) (flUS)
L-201 L2 Tgt 6 OBa 9667.32 87.40 130.60 4516.70 4436.00 3114,24 7298.98 1207,88 5078.88 6,00 -D.49 -5,99 -95,11G 5919585.00 588390.00 N 10.35403227 W 149,28223181
9100,00 87.23 128.64 4518.23 4439,53 3146,89 1331.63 1181.06 5104,03 6.00 -0.53 -5.98 -95.02G 5919564.48 588415,36 N 10,35397535 W 149,28203375
End Crv 9769.13 86,87 124,51 4521.19 4443.09 3215.19 1400.67 1145.93 5159.46 6.00 -D.51 -5.99 O.OOG 5919523.95 588411.26 N 10.35366288 W 149,28158390
Crv 61100 9821.11 86,87 124,51 4524.61 4445,91 3268.11 1453.23 1116.15 5202.77 0.00 0.00 0.00 11.31G 5919494.61 588514.89 N 10.35318146 W 149,28123241
L-201L2 Tgt 1 OBa 9884.13 87.70 126,95 4526,10 4448.00 3310.90 7496.14 1091,09 5237.61 6.00 1.93 5.69 11.05G 5919470.00 588550.00 N 10,35311293 W 149,28094972
9900.00 88.39 128.95 4527.90 4449,20 3346.12 7531.39 1069.42 5265.40 6,00 1,95 5.68 10.99G 5979448,64 588518.03 N 70.35365366 W 149,28072419
End Cry 9903.03 88.45 129.12 4527.99 4449,29 3349.15 1534.42 1067.51 5267.75 6,00 1,96 5.61 O.OOG 5979446.75 588580.40 N 10.35364845 W 149,28070509
Crv 6/100 10658.98 88.45 129.12 4548,47 4469,11 4104.13 8290,09 590.68 5853,99 0,00 0,00 0.00 28.16G 5978976.52 589111.85 N 10.35234461 W 149,27594836
L-201L2 Tgt 8 OBa 10669,42 89,00 129,42 4548,70 4470,00 4115.11 8300,53 584.07 5862.07 6,00 5,29 2.83 28,15G 5978970.00 589180.00 N 10.35232653 W 149,27588278 .
End Crv 10619.46 89,53 129.70 4548.83 4470.13 4125.21 8310.56 577.68 5869,81 6,00 5.29 2.83 O.OOG 5978963.10 589181.81 N 10,35230906 W 149,27582001
Crv 61100 11223.14 89,53 129,10 4553.28 4414,58 4668.81 8854,23 230.31 6288,08 0.00 0,00 0.00 105,66G 5918621.09 589609.88 N 10.35135932 W 149,27242654
L-201L2 Tgt 9 OBa 11255.95 89,00 131.60 4553,70 4415.00 4701.61 8887.04 209.00 6312.97 6.00 -1,62 5.18 106,87G 5918600.00 589635.00 N 70.35130087 W 149.27222462
End Cry 11214,96 68.61 132,69 4554,09 4475.39 4720.66 8906,04 196,25 6321.06 6.00 -1,74 5.14 O,OOG 5916567.41 589649.23 N 70.35126600 W 149,21211030
Crv 6/100 11944,26 88.61 132.69 4569,63 4490.93 5389,04 9575.16 -257.45 6818,81 0.00 0,00 0.00 -91.51G 5978139.25 590146.01 N 10,35002537 W 149,26812101
L-201L2 Tgt 10 OBa 11989,12 88.60 130,00 4570,70 4492.00 5433,88 9620.01 -267,08 6652.54 6,00 -0.15 -6.00 -90.24G 5978110.00 590180,00 N 70,34994434 W 149,26184791
12000.00 88.60 129.35 4570.97 4492,27 5444,15 9630.88 -294,02 6660.90 6.00 -0.02 -6.00 -90.22G 5978103.15 590188,44 N 10.34992536 W 149,26778004
12100,00 88.56 123,35 4573.43 4494.73 5544,41 9730,65 -353,24 6941.39 6.00 -D.02 -6.00 -90.07G 5978044,84 590269,57 N 70.34916337 W 149,26712713
End Crv 12153.12 88,58 120,12 4574.76 4496,06 5591.61 9784,56 -381.48 6987.06 6,00 0.00 -6.00 O,OOG 5978011,11 590315.55 N 70.34966610 W 149,26675661
Crv 61100 12551.30 88,58 120.12 4584,61 4505,91 5989.18 10182.02 -580.94 1330,85 0,00 0,00 0.00 -166,91G 5977821.50 590661.50 N 70.34914030 W 149.26396742
L-201 L2 Tgt 11 OBa 12595,45 86,00 119,52 4586,70 4508,00 6032.58 10226,12 -602.87 7369,11 6,00 -5,84 -1.36 -166,61G 5977800.00 590100.00 N 10,34906029 W 149,26365104
12600,00 85,13 119.46 4581.03 4508,33 6037,04 10230.65 -605,10 7373.05 6.00 -5.84 -1.39 -166.61G 5977797.81 590103.91 N 70.34907418 W 149,26362503
End Crv 12623,29 84.36 119.13 4589.04 4510,34 6059,84 10253,86 -616,46 1393.29 6.00 -5.84 -1.40 O,OOG 5977786,68 590724.33 N 70.34904311 W 149,26346083
Crv 61100 12831.24 84.36 119.13 4609.42 4530,72 6263,01 10460.80 -711,20 7574.06 0.00 0.00 0.00 5.56G 5977687.91 590906.19 N 70.34876739 W 149.26199429
L-201L2 Tgt 12 OBa 12858.45 86.00 119.29 4611.70 4533,00 6289,71 10487,91 -130,43 7597.12 6,00 5.91 0.58 5.41G 5977675.00 590930.00 N 10.34813118 W 149,26180231
End Crv 12889.94 87.88 119.41 4613.38 4534.68 6320.61 10519,36 -745,86 1625,12 8,00 5.91 0.57 O,OOG 5977659,88 590951.51 N 10.34868896 W 149,26158001
TO 14-112" Lnr 13493,61 87,88 119.47 4635,70 4557.00 6913.11 11122,62 -1042.62 8150.34 0,00 0,00 0.00 O,OOG 5977369.00 591486.00 N 10,34781611 W 149,25731933
Leaal Descrløtlon:
Northlna IY\ rftUSl Eastlna (X) rftUSl
Surface 2591 FSL 3588 FEL S34 T12N R11E UM 5978320,84 583325,34 .
L-201L2 Tgt 2 OBa 4823 FSL 544 FEL 534 T12N R11E UM 5980580,00 586340,00
L-201L2 Tgt 3 OBa 4680 FSL 302 FEL S34 T12N R11E UM 5980440.00 586584.00
L-201L2 Tgt 4 OBa 4390 FSL 5141 FEL 535 T12N R11E UM 5980155,00 587029.00
L-201L2 Tgt 50Ba 4085 FSL 4147 FELS35 T12N R11E UM 5919862.00 588021.00
L-201L2 Tgt 6 OBa 3603 FSL 3781 FEL 535 T12N R11E UM 5979585.00 588390,00
L-201L2 Tgt 70Ba 3666 FSL 3629 FEL S35 T12N R11E UM 5979470.00 588550,00
L-201 L2 Tgt 8 OBa 3119 FSL 3005 FEL 535 T12N R11E UM 5918970.00 589180.00
L-201L2 Tgt 9 OBa 2804 FSL 2555 FEL S35 T12N R11E UM 5978600.00 589635.00
L-201L2 Tgt 10 OBa 2301 FSL 2011 FEL S35 T12N R11E UM 5918110.00 590180,00
L-201L2 Tgt 11 OBa 1991 FSL 1501 FEL 535 T12N R11E UM 5977800.00 590700,00
L-201L2 Tgt 12 OBa 1863 FSL 1272 FEL 535 T12N R11E UM 5917615,00 590930,00
TDIBHL 1550 FSL 720 FEL S35 T12N R11E UM 5977369,00 591486,00
Well Design Ver 3,1RT-SP3,03-HF2.03 Bld{ d031rt-546)
Plan L-201 {N-U)IPlan L-201 {N-U)IPlan L-201 L2 OBa1L-201 L2 (P3) OBa
Generated 3/412004 8:58 AM Page 2 of 2
g
o
8
...
.....
~
...
11
CD
~
o
~
Schlumberger
WElL
FIElD
Prudhoe Bay Unit - WOA
STRUCt\IOE L-PAD
L-201 L2 (P3)
---
MedII: 100M 2003
""'- """""
lit N70212.e&t
Lon: W14919Z4,511
NA027 AJ.b .... P\8neI, Zone (w, us Fell
NøtNng: tIP7&320.t4ftUI GftdCOlw: +0.83113312"
e.tIng; !83325.341tUS .... F8Ct O.M88OT8l72
-
M ......l-201~
AM: L-201L2(P3Oh
o.r. M8Id'I tt, 2004
FS: 5755.3 "T
otv. 10.122"
M.tgDeo: +25.02"
TVD R.f: AIMry T'" (71.10 It --. MSl)
1NyDMe: ..IIInI*)'0I.2004
o
1000
2000
3000
4000
5000
6000
4000
· . . . . . . .
...........................¡.....................................;.....................................¡.....................................¡..........................u..........j......................................,....................................¡.....................................;.
~_.._' '. .._~~" -·f~:~~··.._·, -.....-..- ~~·;;~~"~:~:~·~';;:·;~:-r-L.2ÕIL2·T;¡5 öii;·..;~;~:..··'·ë;;~~i~~~:-~·¡;:~~~·~~·;~:·;···.._···1···-..." -..-....,-......., r·'-··_··:.~~~~·~;·;~~~~l'
..... .._......~' " ..l~'iÓir¿,fÏi1oõBï..·Ê4·~1b..Ë~;ë;:,··.._..·r·..·~;;·;;~~·_··I·..~r~Z.._~~·~~-··1··..-~~;~~:..·t..;~;~~·_···..·.._..·..~~~~;r..··7.';~~-~~"."-"-r
:::::::::::::...:'-:& -::::;:;:~~:~::!:'.V·"·t· ..····.._..·:;·:·..~..~::t;;::i.:~::· ";(/~·i::·r·::::;~· :··:;~;::::::~ii::::::~::::::::::::::::::::::::::i:~:::::::::::::":!:'
-..-.....-..fj....... .......-.....................-..... "-17' ···..·..-..-..·..·..-..·..·..-··....1-\..·..-.. .......... lUŒIILU,L.I.1 .. ~I 1i. ~I"
· nh, . .! /. . . I.. _.~"J '
-..-........... ........--...,. ,n. J¥" ". .........."W ".".".".""W.".".".". -.. .....-.....,...... ..........-.....~;.
· UÞu·. "'.. . . , .
; ! Cry 8/100 : Cry 8/100 : Cry 8/10~ Cry 8/ioo .. ¡ ""'q ¡
................. .... ....f.~~.~~.~.~~~~..........,......l...~:.~~.~~~.:.~.~.~~~..~~.~:...............~:~~~~~.~~.~f.~.~...~~~.~.~...~:~.~~.~,:~1?~...~~!!.!:~........k~O,I~Tm.1A.O'II.'....,!;M.Ç.!Y.Ç.\Y.~.10.q.....ß~!!!\.ç,~......... ..1.
I I I I I I L.201L2 Till 12 OB. :
B.~ Whlp01OCk; ; ; ¡ ¡ ¡ TO I <1-112" Lnr ;
~Mf I I ! ! ! ! !
5000
o
1000
2000 3000 4000 5000
Vertical Section (ft) Azim = 130·, Scale = 1(in):1000(ft) Origin = 0 N/-S, 0 E/-W
6000
.
7000
4000
5000
.
7000
1600
^
^
^
z
=-
8
ex>
~ 800
...
1\
Q)
~
(/)
(/)
v
v
v
0
Schlumberger
WELL
.....
Prudhoe Bay Unit - WOA
811WCtIM L-PAD
L-201 L2 (P3)
-...-
Medel: 80Gt.l2003
1-
stat: PllnL·201(N-U)
,..: L-20112(P3)Oh
TW Ref: Aot8ry T.... (78.10 fI abIWe MIL)
SrtyD...: .l8nt.-y0D,2004
Surf_Loc.tIon
Lat: N70212.8&4
Lon: W,-4t 1024.511
NAD27 AIIIU StN~. Zone 04, US F...
NortNng: ðU78320.... RUe Grid Corw:: ..0.83713312'
E8IIIng: M332UUUS "'F..: O.1m9078812
DIp; 80.822'
Mag Dee: +25.02"
OeM; M81d11i.2004
FS: 5755.3 "T
2400
3200
4000
4800
5600
6400
7200
8000
2400
~. N ,
'~~'J:';~;;'~~" ~:~~1~·~~:~~:~:....·....·..·..·..,!·....·....·..·..·....··,·,..·..·..··t....·..····'·..·..·..·............·'¡·........··..·..···..···......···..·t··......................,.,... ~~..···..·..··..···t·,··......·..·,....·....
. L·201I.2Tgt30B. ¡ ¡ ¡ ¡ -~ .
'''9". ~ ''''N I i I ! 'f'
¡ C~eNOO ; I I I . .
............................j..................................~4.L.2.Tgt....08...;.~..-. ··..····..·,j'·'·'·if,,'··,.,~~,;·,.~..··....··..'Cr¥1JttOo·!··..·....··..···..·..···..··..·..·..t··....·..····..·....··..····..··..··!··....··......·······..····..·......t·..··......·····.......
i I ! ':"'~'!'~! ! !
¡ ¡ : L.2~11.2 Tgt 7 OBI :
......·....·....··........·l.....·..··....·..·....·.....···....T....·..·...···..·........···......f·.........·..·............·....··I....··....·!\?!!·!<\'!....·····..·..¡····....
¡ ¡ ¡ ¡ Crv8l1j¡o
¡ ¡ 1 ¡ L·2011.2 Tgt; 081
: : : : ~nd Crv
¡ ¡ ¡ ¡ ¡ Crv8l100
¡ ¡ ; : ; L·2011.2 Tgt 9 OB.i·
.. ......... ...... ...........~ .......... ........... ... .......... ··r........·..· .............. ...... ....~ ...................... ··..··..··....r···......·..···..........··..·..·..1..··..·..·..···..·..··~~·ë~ ..·r~"'!· ...;,~....... ....····..1".·· .......... .... ........ ·········..·t". ................ .......
: : : : : :
¡ Crv 81100 ¡
i L·2011.2 Tgt 11 oris
¡ End Crv ¡
, Crv 8I1QO
·2011.2 191 12 OBI
E1d Crv
-800
TD /4-1/2" Lnr
2400
3200
4000
4800 5600
<<< W Scale = 1(in):800(ft) E >>>
6400
7200
8000
.
2400
1600
800
.
o
-800
.
BPX AK
Anticollision Report
.
Company:
Field:
Reference SUe:
Reference Well:
Reference· Wellpath:
BP ArT1òc()
Prudhoe Bay
PB L Pad
Plan C·201 (N-U)
plan L-201 L2 OBa
Date: 1/912004
Time: 11:14:57
Page:
Co-ordinate(NE) ·Reference:
Vertical (fVD)Reference:
Well: Plan L-201· (N-U), True North
L-201 Plan N-U 78.7
NO GLOBAL SCAN: Using Usei' defined selection & scan criteria
Intel'Jlolatlon Method: MD Intel'Val: 50.00 ft
Depth Range: 6329.00 to 13493.61 ft
Maximum Radius: 1??oo.00 ft
Reference:
Errol' Model:
Scan Method:
Errol' Suñace:
Db: Sybase
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cyfinder North
Ellipse + Casing
SUl'Vey Progr-am for Definitive Wellpath
Date: 1/812004 Validated: No
Planned From To SUl'Vey
ft ft
28.50 6329.00 Planned: Plan #5 V1 (0)
6329.00 13493.61 Planned: Plan #3 V1
Venion: 2
Toolcode
Tool Name
MWD+IFR+MS
MWD+IFR+MS
MWD + IFR + Multi Station
MWD + IFR + Multi Station
ClUing Points
MD TVD Diameter Hole Size Name
·.ft ft in in
3189.31 2638.70 10.750 13.500 103/4"
6421.00 4543.04 7.625 9.875 7-518"
14071.05 0.00 4.500 6.750 4 1/2"
Summa!')'
< Offset Wellpath :> Refel'e~e Offset Ctr~tr No-Go Allowable
Site Well . Wellpath MD· . MD Distance Area Deviation Warning
ft ft ft ft ft
EX NWE#1 NWE1-01A NWE1-01A V4 Out of range
EX NWE#1 NWE1-01 NWE1-01 V3 Out of range
PB L Pad L-01 L-01 V14 7242.40 4900.00 4095.98 85.64 4010.34 Pass: Major Risk
PB L Pad L-01 L-01 L 1 V2 Plan: Plan # 7242.40 4900.00 4095.98 85.65 4010.33 Pass: Major Risk
PB L Pad L-02 L-02 V1 Out of range
PB L Pad L-02 L-02PB1 V21 Out of range
PB L Pad L-102 L-102 V2 10843.74 7950.00 712.53 171.60 540.93 Pass: Major Risk
PB L Pad L-102 L-102PB1 V10 7804.89 3464.00 3180.67 86.17 3094.50 Pass: Major Risk
PB L Pad L-102 L-102PB2 V2 7736.84 3464.00 3147.80 82.84 3064.96 Pass: Major Risk
PB L Pad L-103 L-103 V23 8250.00 6450.00 844.78 137.22 707.57 Pass: Major Risk
PB L Pad L-104 L-104 V7 11746.89 8550.00 1663.34 210.05 1453.29 Pass: Major Risk
PB L Pad L-105 L-105 V4 8220.77 6000.00 2569.98 134.20 2435.78 Pass: Major Risk
PB L Pad L-106 L-106 V14 7189.86 5350.00 2757.69 84.92 2672.78 Pass: Major Risk
PB L Pad L-107 L-107 V14 8050.00 4250.00 4204.38 113.13 4091.25 Pass: Major Risk
PB L Pad L-108 L-108 V18 6910.60 3650.00 4268.79 73.34 4195.45 Pass: Major Risk
PB L Pad L-109 L-109 V12 6880.72 4600.00 5176.49 76.60 5099.89 Pass: Major Risk
PB L Pad L-110 L-110 V11 6853.82 7700.00 8175.89 78.88 8097.01 Pass: Major Risk
PB L Pad L-111 L-111V24 Out of range
PB L Pad L-112 L-112V8 Out of range
PB L Pad L-114 L-114 V14 Out of range
PB L Pad L-115 L-115 V7 Out of range
PB L Pad L-116 L-116 V10 Out of range
PB L Pad L-117 L-117V11 Out of range
PB L Pad L-118 L-118V9 6329.00 8400.00 2340.13 79.02 2261.12 Pass: Major Risk
PB L Pad L-119 L-119V9 6411.92 6100.00 161.58 75.31 86.27 Pass: Major Risk
PB L Pad L-120 L-120 V8 8234.25 6500.00 366.76 122.18 244.58 Pass: Major Risk
PB L Pad L-121 L-121 V14 Out of range
PB L Pad L-121 L-121A V1 6993.28 6250.00 7703.44 107.05 7596.39 Pass: Major Risk
PB L Pad L-122 L-122 V5 Out of range
PB L Pad L-21 0 L-210PB1 V7 9879.34 7250.00 830.00 102.01 727.99 Pass: Major Risk
PB L Pad L-21 0 Plan L-210 V3 Plan: PI 10295.31 7700.00 599.17 135.98 463.20 Pass: Major Risk
PB L Pad Plan L-113 (N-B) Plan L-113 V5 Plan: PI Oul of range
PB L Pad Plan L-123 (N-R) Plan L-123 V1 Plan: PI 8139.18 6850.00 224.99 119.11 105.88 Pass: Major Risk
PB L Pad Plan L-124 (N-C) Plan L-124 PB1 V1 Plan Out of range
PB L Pad Plan L-124 (N-C) Plan L-124 V1 Plan: PI Out of range
PB L Pad Plan L-2oo (N-M) Plan L-2oo OBd V1 Plan Out of range
PB L Pad Plan L-2oo (N-M) Plan L-2ooL 1 OBa V3 PI Out of range
PB L Pad Plan L-2oo (N-M) Plan L-200L2 OA V2 Pia Out of range
PB L Pad Plan L-201 (N-U) Plan L-201 OBd V1 Plan 6349.99 6350.00 0.37 78.27 -77.90 FAIL: Major Risk
PB L Pad Plan L-201 (N-U) Plan L-201L 1 OBb V2 PI 12884.03 12900.00 32.71 199.57 -166.86 FAIL: Major Risk
PB L Pad Plan L-211 (N-H) Plan L-211 V1 Plan: PI Out of range
-294
··..·..·200
"100
-0
-100
--200
--294
27(}
ðl
Field: Pr\.._aioe Bay
Site: PB L Pad
Well: Plan L-201 (N-U)
Wellpath: Plan L-201L2 OBa
\
\
..
.,
,
'-
"
..'
.,'
"
"
'~"""".
"-
"-
......",
" '
'~''''''''''
.. ..
180 g.¡
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [100ft/in]
.
90
.
e
e
PERMIT TO DRILL
20 MC 25.005
(e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well
branches are proposed from a single conductor, surface, or production casing, the applicant shall
designate one branch as the primary well bore and include all information required under (c) of this section
with the application for a Permit to Drill for that branch. For each subsequent well branch, the application
for a Permit to Drill need only include information under (c) of this section that is unique to that branch
and need not include the $100 fee.
.
.
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLNAME~~úf ¿- ;2.0/ L ~
PTD# 20"1 - Ot¡?
)<
Development
Service
CHECK WßA T
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
x
(If API num ber
last two (2) digits
are between 60-69)
Pß..,OT
(PH)
Exploration
Stratigraphic
~'CLUEn
Tbe permit is for a new wellbore segment of
existing well I'ð t-t.t.. - 2ð .I
Permit No, 2os.--ôSo'¢I No. :k>~t>2.1-- <.32..0 a....
Production sbould continue to be reported as
a function' of the original API number. stated
a hove.
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for tbe pilot
bole must be clearly differentiated In both
name (name on permit plus PH)
and API Dumber (SO
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
The permit is approved subject ·to fuD
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to tbe spacing exception tbat may
occur.
An dry ditcb sample sets submitted to tbe
Commission must be in no greater -tban 30'
sample intervals from below tbe permafrost
or from where samples are first caugbt and
10' sample intervals through target zones.
PTD#: 2040480
Administration
Well bore seg
Annular Disposal
Appr Date
RPC 3/8/2004
Engineering
Appr Date
WGA 3/8/2004
Geology
Appr
RPC
Date
3/8/2004
Geologic
Commissioner:
~rS
Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135
Company BP EXPLORATION (ALASKA) INC Initial ClasslType
1 P~rmitfee attaçhe~_ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _
2Leas~_number_appropriale_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _
3 _U_nique weltn_a[T1~_atld Ol!mb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4 WeJUocat~d ina_d.efine~ppol. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _
5 WellJocat~d pr_operdistance_ from driJling unitb_ound_a!y_ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6 WellJocat~d proper _distance_ from other welJs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7 _S_uffiçientaçreageayailable [ndriUilJg unjt .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
8 Jf.d~viated, js_ weJlbore plç¡tincJuded _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
9 _Operator only affeçted party _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
10 _Operator bas_apprppr[ate_bond inJorçe _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
11 P~rmil c.atl be iSSl!eçl without conservation order _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
12 P~rmil c_an be iSSl!eçl without ad_ministrathle_apprpvaJ. _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
13 Can permit be approved before 15-day wait Yes
14 WelUocaled within area aIJd_strç¡ta _authorized by lojeçtiPIJ Ord~r # (puUO# in_cp[T1[T1eots).{forNA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
15 AJI welJs_witpio_1l4_llJile_area_of reyiew id~lJt[fied (Fpr sefVj~.w.ell only) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
16 Pre-produ.ced. itljector; ~uralion.of pre-pro~uçtion I~Ss. than_ 3. months_ (for_service well onJy) _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
17 ACMPF:indjng.of Co n_si.ste tlcy has bee.n.is.sued.for.this proieçt _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
18 _C.ooductor string_provided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
19 _S_urfac~ _casing protects. alLkoown_ USOWs _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
20 _CMTvotadeQuate.to çircJJtate_oo_conduçtor_& surfcsg _ . _ _ _ _ _ _ . _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
21 _CMT vol. adeQl!ate.to tie-inJongstritlg to surf çsg_ _ _ _ _ _ _ _ _ _ _NA _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
22CMTwill coyeraJl kno.w.n-Pfo_ductiye horizons_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ __No _ Slotte_d. _ _ _ _ _ _ _ _ _ _ . _ _ _
23 _C_asiog desigtls adequa_te fpr C,T, B_&. permafrpst _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
24 A~equate_tanhge_or re_serve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ .Y~s _ _ _ _ _ _ _ Nab_ors.9_ES. _ _ _ _ _ _ _ _ _ _ _ _ _ _
25 Jf.aJe-drilt has a 10A0;3 for abançlolJment be~1J apPJoved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ Quadlateral._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
26 Adequale.w.eJlboresepÇ1ratio_nproposeçl_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~S _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
27 Jf.divecterreq.uired, does jtmeel reguJa_tions_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ Siçletrack;. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _
28 _DriUilJgflujd.programsc.hematic&eQ.uipJistadequat~ _ _ _ _ _ _ _. _ .Y~s _ _ _ _MaxMW_9,2ppg,_ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
29 .BOPEs,_dothey meelreguJa_tion _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
30 _BOPEpressratiog appropriate; _tesHo(put PSig in _comments) _ _ _ _ _ _ _ _ .Y~s _ _ _ _ _ Test tp3500_ ps[.I\lIS~ 1680 psi.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _
31Choke_llJanjfoldçompJies.w/APtR~-53.(MayS4) _ _ _ _ . _ _ _ _ _ _ _ . _ _ Yes _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _
32 Wo~ willpccur withputoperç¡tjon_shutdow.n_ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ Yes_
33 JspresetlceofH2Sgas_prob_able_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . No_
34 Me.chan[cç¡Lcpodjt[otl pf wells within ,L\OR yerified. (For_s_ervjce welJ onJy) _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ . _ _
Well Name: PRUDtlOE BAY UN ORIN L-201L2 _Program DEV
DEV /1-0IL GeoArea 890 Unit 11650 On/Off Shore On
- - - - - --
- - - - - - ~
- - - - - - - -
- - - - - - -
- - ~ - - -
- - - - --
- - - - - -
- - - - - -
- - - - - - -
- - - - --
35 P~rmil c.atl be iSSl!eçl wlo hyçlrogen. sulfide meaSJJres _ _ _ _
36 _D_ata.preselJted on_ potential pveJRres_sure _zone.s_
37S~ismic_aoalysjs of shaJlow gaszPlJes _ _ _ _ _ _
38 _S~ç¡bedconditipo survey.(if off-shore) .
39 _ Contact namelpPOIJeJorweelsly prpgress_reports [explorç¡tp
_ _ Yes _
- - - - - - - - - - - - -
- - - - - -
- - - - - -
- - - - - - -
- - - - - -
NA
. _ NA
_NA
NA
- - - - - -
- - - - - - - - - - - - - - - - - - - - ~ - - - - - - - -
- - - - - -
- - - - - - -
- - - - - - ~ -
- - - - - -
- - - - --
- - - - - --
- - - - ~ -
- - - - - - -
- - - - - - ~ - - - - - - -
- - - - - - - - - - - - - - - - - - - - -
- - - - - -
Date:
Engineering
Commissioner:
"ijtþf
- - - - - -
- - - - - - - - - - - - , - -
- - - - - -
Date
i-j~ /4-
~
D
.
.