Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-049
e e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
aO 4:- - O.Y- _q Well History File Identifier
y0wo-sided 1111111111111111111
Organizing (done)
o Rescan Needed 11111111I1111111111
RES CAN
0I9IT AL DATA
\zf'Oiskettes, No.~
o Other, NolType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Color Items:
o Greyscale Items:
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Date &, 1 010
o Other::
BY: ~
151
Wtf
1111111111111111111
V11f
Project Proofing
BY: ~
Date (¡;(r 0 ~
:l x 30 = ~ ()
Date: to q 0 to
151
Scanning Preparation
BY: , Maria.J
+ d. 9) = TOTAL PAGES C($"g
(Count does not include cover sheet) ,/lAP
151 r r ~
Production Scanning
1/11111111111111111
Stage 1 Page Count from Scanned File: <t? c¡ (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
BY: ~ Date: 10 /1/0 (¡; 151
NO
vvtP
Stage 1
If NO in stage 1, page(s) discrepancies were found:
YES
NO
BY:
Maria
Date:
151
11/1111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
1111'111I111111111I
10/6/2005 Well History File Cover Page.doc
•
_~-F~__~
,~:~
~_.
MICROFILMED
03/01 /2008
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F: \LaserFiche\CvrPgs_Inserts\Microfilm_Marker. doc
11/14/06
11/17/06
Schlumberger
NO, 4040
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: Alaska Oil & Gas Cons Comm
Att": Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Orion
Well
Job #
Log Description
Date
BL
Color
CD
L-201L1 PB1 40010303 OH EDIT OF MWD/LWD 04/09/04 2 1
L-201L3 PB1 40010303 OH EDIT OF MWDILWD 04/25104 2 1
V-210 40011161 OH EDIT OF MWDILWD 11/05/04 2 1
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc
Petrotechnical Data Center LR2·1
900 E Benson Blvd
Anchorage AK 99508-4254
NOV ~~ ;:¡
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503.283iL.
A TTN Beth A _ ~ ______
Received by L~- L
.
Date Delivered'
p.
¿Jeff - 040
-/;k I '--I f) b 15
~
11/08/06
sc.....ger
~IOV 1 32006
NO. 4029
Schlumberger-DCS
2525 Gambell St. Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
Company: Alaska Oil & Gas Cons Comm
Att": Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
i~t.I!W~ 011 f~ (~1\".,,* COO;;;. Com~
Field:
Orion
Well
Job #
Log Description
Date
BL
Color
CD
V-204L1 40010781 OH EDIT OF MWD/LWD 08/14/04 1 1
V-204L1 PBI 40010781 OH EDIT OF MWD/LWD 08/14/04 1 1
V-204L2 40010781 OH EDIT OF MWD/LWD 08/22/04 1 1
V-204L2 PBI 40010781 OH EDIT OF MWD/LWD 08/22/04 1 1
V-204PB2 40010781 OH EDIT OF MWD/LWD 08/09/04 1 1
V-204L3 40010781 OH EDIT OF MWD/LWD 08/28/04 1 1
L-201 40010303 OH EDIT OF MWDILWD 04/03/04 2 1
L-201 PBI 40010303 OH EDIT OF MWD/LWD 03/30/04 2 1
L-201 PB2 40010303 OH EDIT OF MWD/LWD 04/01/04 2 1
L-201LI 40010303 OH EDIT OF MWDILWD 04109/04 2 1
L-201L2 40010303 OH EDIT OF MWD/LWD 04/19/04 2 1
L-201L3 40010303 OH EDIT OF MWD/LWD 04/26/04 2 1
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc
Petrotechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
Sch/umberger-DGS
2525 Gambel! St. Suite 400
Anchorage. AK 99503-2838
A TTN: Beth
Date Delivered"
Received by:
.
doL..I-o~CJ
:p:
1~;)31
'30 ~ ~
DATA SUBMITTAL COMPLIANCE REPORT
4/24/2006
Permit to Drill 2040490
Well Name/No. PRUDHOE BAY UN ORIN L-201L3
Operator BP EXPLORATION (ALASKA) INC
5 III ~ ~~Aqo y
API Z. 50-029-23202-62-00
MD 9860
TVD 4422
Completion Date 4/30/2004
Completion Status 1-01L
Current Status 1-01L
UIC N
~---------
---- -~-----
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
---------
.------ -- ------
DATA INFORMATION
Types Electric or Other Logs Run: MWD 1 GR / RES I Azimutal DEN 1 NEU 1 AIM 1 PWD
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number
i ED D Asc
L~~__ ____~__
(data taken from Logs Portion of Master Well Data Maint
Run
No
Interval
Start Stop
~.
Name
Directional Survey
Log Log
Scale Media
OHI
CH
Received
5f! /2004
5f!12004
Comments
Directional Survey
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
ADDITIONAL INFORMATION
Well Cored? Y &>
Chips Received? - ) 1 N
Daily History Received? IçJj N
Formation Tops t@N
Analysis
Received?
~
~.
--------~-
- -- -~-----
Comments:
Compliance Reviewed By:
'-.J b
Date:
;;;.s ~ ).ß a ~
-----~ ------.----
-- --..---------
Andy,
Open hole log data is missing for the following wells:
PBU Orion L-201 50-029-23202-00
PBU Orion L-201 L 1 50-029-23202-60
PBU Orion L-201 L2 50-029-23202-61
PBU Orion L-201 L3 50-029-23202-62
Please submit to the Commission as soon as possible;
Open Hole digital log data ( LIS, DLlS, or LAS)
Open Hole Blue line logs
Open Hole reproducables - sepia/mylar or digital graphics files (.pds or .pdf or .emf )
TNX for your help.
Howard
tn~
~.; ;:.. {j(."". mff'"
. -... f 1~,t,. .. ~ "..!...' i ~ ~':'.
...~ 'i~!,:- .:-. ~- ~ . -;;~~ .."
t .: 'f;' ....'1 t: '1
':--- ~,': ",," :<': !
wvvvv. Petrol e u m N ews.com
. NORTH SLOPE
~;·~çTßj ¡:f<€fì~ ~.~
Ai:t: 1!~: {1\1
~ocr- () £fC[
,I '
It) 31 lot
PETROLEUM NEvVS 9
pß\.J L-.1DI L3
BP cOInpletes
quad-lateral at Orion
Drilling end of viscous equation appears solved; production oj heavy oil still
an issue because oj sand produced with oil and welllnaintenance issues
By KRISTEN NELSON
PcLrolculII News EdiLor-in-Chicf
The viscous oil resource on Alaska's NOlih Slope
- like the natural gas resource there - has
been known (011 decades, but heavy oil has bcen
as stranded as gas, stranded in the ground
through lack of the technology and knowledge Ileces-
salY to produce it.
UP Exploration (Alaska) has been working on
ways to produce viscous oil, also reCen'cd to as heavy
oil, at Milne Point since the 1990s and now also has
viscous oil under devclop- .
men! in the weslem Prudhoe L :1 /2 A't.Jÿ
satellites. . '.
., Multi-lateral horizont.al S E R I E S
wells have solved the drilling
side of the viscous equation,
but problems remain on the production side, members
of BP Exploration (Alaska)'s drilling team told
Petroleum News in late September.
Viscous oil accumulations lie closer to the surlllce
and are colder, less mobile and have poorer reservoir
quality than conventional crude oil, said Mik Triolo,
Greater Pl1ldhoe Bay operations drilling engineer.
Triolo worked the Schrader Bluffviscous accumu-
lation at Milne Point before moving over to Orion,
working on the carly multi-lateral and horizontal well
designs in late 1999, early 2000. "And we've progres-
sively evolved that technology ever since," he said.
That work is continuing at Orion, a Pl1ldhoe Bay
western satellite viscous· oil accumulation. Multi-lat-
eral wells, well bores with multiple horizontal laterals
into shallow sands containing viscous oil, make wells
productive enough to bc economic.
First tri-Iateral in 2003
In 2003, DP drilled the first tri-Iateral multi-lateral
well on the slope, and this year, the company set a
world record with a quad-lateral well.
"Horizontal multi-lateral wells have been the key
to unlocking those (viscous) reserves... predominate-
ly through efficient geo-stccring within the segregated
sands... Rather than undulating through them," Triolo
About the series
Editor S Note: Members of BP
Exploration (Alaska) s drilling group sat
down with Petroleum News Sept. 28 to talk
about the company's development drilling
program, recent drilling records and about
the technology that is driving the company s
North Slope development drilling. Part 1 of
this story, printed ill the Oct. 10 issue of
Petroleum News, included all overview of the
company s North Slope drilling activity and
an update on its coiled tubing drilling pro-
gram. Part 2, which appeared in the Oct. 24
issue, described multi-lateral drilling at
Milne Point, and wel/maintenance work.
said, "we actually stick dedicated laterals into each
one of the sand intervals." In addition to better ability
to steer through the fonnations, drilling also helps vis-
cous oil deveJopment with "good well design," he
said.
A cl1lcial part of the well is where the laterals
branch fi'OIll the main well bore, and Br has also been
trying different junction designs, the connection
between the main well bore and the lateral.
At Milne Point BP detemlined "that the level three,
the TAML level three junction, was the junction of
choice.. .," Triolo said. TAML stands for Technical
Advancement of Multilaterals, an organization set up
to regulate "the different levels of multilateral junction
equipment such that everything is standardized," he
said. "So if Baker comes out with a level-thrce junc-
tion, the criteria that are set up to distinguish between
a level-three and a level-four, are the same as for
Halliburton.. ."
The TAML levels, said Mark Johnson, BP senior
coiled tubing drilling engineer, "refer to the re-entty
capability of the junction and how well it seals or iso-
lates at that jWlction." Re-entty capability and the seal
see BP page 10
~ -<'
10
---...-
,~.
continued from page 9
;.c
:.c:
~
~
z
o
. provided are the two primary things a junc- 5
tion does, he said. ~
x
Triolo said BP detennined "that we did ~
not need isolation at the junction - what we ~
needed was access to the lateral, so the level- ~
three junctions became the method of ~
::;)
choice." 8
BP
First level-three,
quad-lateral well in world
BP took its experience at Milne Point to
Orion, a western Prudhoe Bay satellite, and
this year "we drilled the first level-three
quad-lateral multi-lateral well in the world,"
Triolo said. (The accompanying graphic
illustrates such a quad-lateral multi-lateral
well.)
BP's initial experience with multi-lateral
wells was that complicated wells were
.
expensIve for the wells group to maintain:
"We didn't really have cost-et1cctive ways
to work on the wells or impact the flow
streams of the wells later in life, so we went
back to the drawing board and came up with
some criteria that we wanted to see achieved
in our well designs, and then worked with
our v.endors to come up with a solution to
those problems."
The current system, he said, was "proved
up in Milne Point" and the junction design
was modified at Orion "to add more e!1ì-
ciel1cy to the full life-cycle cost of the well,"
Triolo said. Well work can now be done
through the tubing, with a coiled tubing unit,
without the need for a workover rig.
The total footage in the quad-lateral well,
Prudhoe Bay unit L-20 I, was almost 35,000
feet, with "almost 28,000 ieet of horizontal
footage within these thin bedded sands,"
more than five miles of horizontal footage in
OIlC well, Triolo said.
There were cleanup issues with the well,
and UP didn't realize full flow potential, but
the well had a productivity index of 40 (a
measure of bands per pound of square inch
drawdown), compared to most wells on the
slope somewhere ill the 20-range.
"If we could have opened it up lull bore,
we probably would have been somewhat
tubing limited," he said.
Facility limited
Right now the well is facility limited,
Triolo said. Daren l3eaudo, I3P's director of
public affairs, said one of the things BP
worked on during the summer production
G~ÆY1ht6rAf"
vlscoua OIL QUAD ML COMPLETION
- "JF
11 J
R)
, Ht
J
ill
~
~1_.~_.
>-
. .
..
....
..
~--
~04·- D 1.ffC¿TROLEUM NEWS. WEEKOFOcrOBER31,2004
~ ,";~~~¥;!-:>i~=}~~;_~~~~
shutdown at Prudhoe Bay was cleaning sand
out of tanks in Gathering Center 2. "One of
the constraints that we've had is managing
all of this sand," he said.
"This is a viscous oil production issue,
nol a well-rate issue," l3eaudo said, and the
issue is the sand produced with the viscous
oil. To really produce viscous to the maxi-
mum, BP will either have to add facilities to
handle sand that comes to the surface or find
a way, such as screens, to kcep the sand in
the rcselvoir.
Not only does sand accumulate in pro-
duction facilities, said Andy Kirk, BP's
Alaska drilling and wells pcrfOlmancc con-
sultant, but it also causes problems in
pipelines because it is cOITosive - another
reason to keep it in the IOllllation.
And if a multi-lateral well has to be shut
in and the oil stops flowing, Kirk said, the
sand can layout along the horizontal portion
ofthe well, creating dunes which plug up the
well, making it difficult to re-establish pro-
duction when the wcll is brought back
online.
Opportunity huge
The oPP0l1unity for viscous' is huge:
'"<4.- ~,""__ :;;~~Ñx;~~;]J=~:'"t::!¢~e
some I.6 billion barrels recoverable with
current technology, said Gary Christman,
BP's Alaska drilling and wells manager.
"We're going through kind of a concept
selection phase ... and one of the things
that we don't know is how we're going to
handle all this production, because it is dif-
ferent."
"This multi-lateral technology has
unlocked the flow potential," said Johnson.
"now we can finally get that reservoir to
flow at economic rates - and that's been
the challenge for the last 20 years. ..."
There are other issues now connected
with gctting viscous production to the sur-
làce, "but the key thing is that this multi-
lateral has unlocked viscous oil."
Christman said the horizontal footage
drilled in the quad-lateral well, the 25,000-
lèet of horizontal hole, has "nol been done
anywhere else in the world: it's just huge,
just huge stuff."
The issues, now, Christman - said, are
sand control and long-term serviceability of
the multi-lateral wells: "The mullilaterals
are there, but do we know we can keep
them all producing for many, many years?
"It will be a sand control issue... And
"Horizontal 11lulti-lateral wells
. l1ave been the hey to unlochil1g
those (viscous) reserves...
predominately through efficient
geo-steeJing within the segregated
sands... Rather than undulating
throug~~ them, we actually stich
dedicated là~erals into each one of
. the sand intervals."
- Mik Triolo, BP Exploration (Alaska)
drilling engineer
long-tenn well serviceability," he said.
Well design evolved here
The men said this is a slope-wide effort,
with a slope-wide viscous team including
SP, ConocoPhillips and ExxonMobil,
working the viscous development issue,
and contractors for the ftnns developing the
technology being used.
Triolo said that while the wcll design in
use al Orion was evolved at OP, "we've
also shared this well design with
ConocoPhillips and so they're using it on
their development," and ConocoPhillips is
"Ieaming things over there that they're
sharing with us," as part of the regional vis-
cous team. ConocoPhiIlips operates the
Kuparuk River unit viscous West Sak
development effort.
The quad multi-lateral has been drilled,
and a quintuple multi-lateral is planncd for
later this year, Triolo said, the first such
well on the slope. That well, however, is
nol planned with five junctions coming out
li'OIn the main well bore, because "some of
these sands are so thin that they cannot eco-
nomically support the cost of a multi-later-
al junction," so coilcd tubing technology
will be used to do an open-hole junction.
Four laterals will come otTlhe main well
bore~ one of those laterals will split again.
The whole well will be drilled with a
rotalY rig, Triolo said, but will use some
coiled-tubing developed technology, scaled
up in size to rotary applications.
Some of that technology was developed
for usc over at Kuparuk, he said, so there is
technology sharing among the di Oèrcnl
drilling groups, as well as between l3P and
ConoeoPhillips.
Drilling, services and materials contrac-
tors responsible for technology [or ßP's
drilling program include: Uaker Hughes
Inteq; Doyon Drilling; HallibUl10n; Nabors
Drilling; Nordie Calista Drilling;
Schlumbcrger; and WellTec Tractor. .
) STATE OF ALASKA )
ALASKA 01L AND GAS CONSERVATION COMIVII-=>SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD / GR / RES / Azimuthal DEN / NEU / AIM / PWD
CASING, LINER AND CEMENTING RECORD
:~~~1?If1~~\Q~~~f;lrøQ·'·li ;·i'S~'rf'~Ø:~t),~RW~~;1;\(~::il, ,;¡I,"'.:!'Rº~8:!I.:';;!I¡·'i
,~, .:·,"1'" m'a. ·oi~·'.""T'·" ,,'ð'Ii:\'I."¡~'~'" ,.1 ~~ ('" 'I 'I "Q.. b·.'I~,·' '~'. I,I'¡'" ~,:,;-",tSM\ , "1·' :,,',1',1,1,,1. S·I":e',,~, ~...II
,11,11: .1.111" r71111·', ,11,',.,1., I'I;J'~,II,::~I,,~~VI ,"" 1',,:11,' I,·:, ,1,1, ,~I'IIIIIII"II ,""~I:IIIII.I~.' """ .' I" "~II',·I,I ,.II, I I ~ ,,·,,1 :II'III',:¡
Surface 108' Surface 108' 48" 260 sx Arctic Set (Approx.)
29' 3197' 29' 2642' 13-1/2" 630 sx AS Lite, 355 sx Class 'G'
27' 60251 27' 4431' 9-7/8" 613 sx Class 'G'
6020' 9846' 4429' 4424' 6-3/4" Uncemented Slotted Liner
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM
Top of Productive Horizon:
105' NSL, 1660' WEL, SEC. 27, T12N, R11E, UM (OA)
Total Depth:
2940' NSL, 730' EWL, SEC. 35, T12N, R11E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 583325 y- 5978321 Zone- ASP4
TPI: x- 585217 y- 5981129 Zone- ASP4
Total Depth: x- 587639 Y- 5978712 Zone- ASP4
18. Directional Survey 181 Yes 0 No
22.
20" x 34"
10-3/4"
7-5/8"
4-1/2"
215.5#
45.5#
29.7#
12.6#
A53
L-80
L-80
L-80
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Section
MD TVD MD TVD
6090' - 9802' 4455' - 4428'
27.
One Other
5. Date Comp., Susp., or Aband.
4/30/2004
6. Date Spudded
4/23/2004
7. Date T. D. Reached
4/26/2004
8. KB Elevation (ft):
78.7'
9. Plug Back Depth (MD+ TVD)
9860 + 4422
10. Total Depth (MD+ TVD)
9860 + 4422
11. Depth where SSSV set
(Nipple) 2266' MD
19. Water depth, if offshore
N/A MSL
Revised: 07/28/04, Put on Production
1b. Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
12. Permitto Drill Number
204-049
13. API Number
50- 029-23202-62-00
14. Well Name and Number:
PBU L-201L3
15. Field / Pool(s):
Prudhoe Bay Field / Orion
Ft
Ft
16. Property Designation:
ADL ADL 028238
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
::'i~~Ò,\'\N:y¡:,:.'
,~I"'16~,,¡q;'I'¡:¡ :1'11·...
11'1',"Ii'\ULll¡;;1J .',1
SIZE
4-1/2", 12.6#, L-80
DEPTH SET (MD)
6000'
PACKER SET (MD)
5873'
29. .'.'., "'. I..:'.·, '. '.,;,.., ',i:···...,:· li;,...,!.ijbrD;~iE~q~bRg';,ÓEM~ÑfsC1~ÊËz:E;EtC;':,'
I '"',,, .,', ", '"" "'..,'~'I·' ,'~' ,,~ ,,', II' ".'", "I." ",', : ",;" .', I,"'· "",10'" "",,' ",,',',' I', I' ,. ,~, ,~,,', '," ,""., ,,',' ,,', " '",
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 150 Bbls of Diesel
GAs-McF
51
W A TER-BBl
21
CHOKE SIZE GAS-Oil RATIO
75 249
Oil GRAVITY-API (CORR)
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
June 28, 2004 Gas Lift
Date of Test Hours Tested PRODUCTION FOR Oll-BBl
7/9/2004 2 TEST PERIOD -+ 203
Flow Tubing Casing Pressure CALCULATED ........ Oll-BBl
Press. 70e 1,300 24-HoUR RATE"'" 2,432
None
Form 10-407 Revised 12/2003
GAs-McF
607
W A TER-BBl
249
OR\G\NAL
CONTINUED ON REVERSE SIDE
RBDMS BFl
JUt 2 9
Î,..r~!.¡
~v
2~8. .
)
29.
)
FORMATION TESTS
GEOLOGIC MARKERS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OA
6048'
4441'
None
Schrader Bluff OA
9149'
4461'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~ J\A.l 0 \1u. ~ Title Technical Assistant Date b7.. ;tR-Ol(
PBU L-201 L3 204-049 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Michael Triolo, 564-5774
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
) STATE OF ALASKA )
ALASKA ulL AND GAS CONSERVATION COMMI':>SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: II Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD / GR 1 RES / Azimuthal DEN / NEU / AIM / PWD
CASING, LINER AND CEMENTING RECORD
"~" .... .1' .:':',"', ."&~"ŒI,N?:Q~~~MI;,,,ISE;TIINqpER;¡rHIWP,,,,,'I4Q,~E:::'·.·:
..1 G~QE,.' .:.1. .:·.:r;O~.:,'I", "BenQM.: ,'"' fep.."., :BO;:¡;~OM' ·'.'I.I''sIZE,:.:,'i,
A53 Surface 108' Surface 108' 48"
L-80 29' 3197' 29' 2642' 13-1/2"
L-80 27' 6025' 27' 4431' 9-7/8"
L-80 6020' 9846' 4429' 4424' 6-3/4"
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2598' NSL, 3588' WEL, SEC. 34, T12N, R11 E, UM
Top of Productive Horizon:
105' NSL, 1660' WEL, SEC. 27, T12N, R11E, UM (OA)
Total Depth:
2940' NSL, 730' EWL, SEC. 35, T12N, R11E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 583325 y- 5978321 Zone- ASP4
TPI: x- 585217 y- 5981129 Zone- ASP4
Total Depth: x- 587639 y- 5978712 Zone- ASP4
18. Directional Survey II Yes 0 No
22.
CASING
SIZE 'I '
20" x 34"
10-3/4"
7-5/8"
4-1/2"
I::' :",,: I,; "':; ",,:,. ;'i I
. VV:T~8ER FT",
215.5#
45.5#
29.7#
12.6#
23. Perforations op'en to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Section
MD TVD MD TVD
6090' - 9802' 4455' - 4428'
26.
Date First Production:
Not on Production Yet
Date of Test Hours Tested
One Other
5. Date Comp., Susp., or Aband.
4/30/2004
6. Date Spudded
4/23/2004
7. Date T.D. Reached
4/26/2004
8. KB Elevation (ft):
78.7'
9. Plug Back Depth (MD+TVD)
9860 + 4422
10. Total Depth (MD+TVD)
9860 + 4422
11. Depth where SSSV set
(Nipple) 2266' MD
19. Water depth, if offshore
N/A MSL
1b. Well Class:
II Development 0 Exploratory
o Stratigraphic Test 0 Service
12. Permit to Drill Number
204-049
13. API Number
50- 029-23202-62-00
14. Well Name and Number:
PBU L-201 L3
15. Field / Pool(s):
Prudhoe Bay Field / Orion
Ft
Ft
16. Property Designation:
ADL ADL 028238
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
:~~Q4f';JJ;"
".'Rl:!iLl~ED'
260 sx Arctic Set (Approx.)
630 sx AS Lite, 355 sx Class 'G'
613 sx Class 'G'
Uncemented Slotted Liner
SIZE
4-1/2", 12.6#, L-80
DEPTH SET (MD)
6000'
PACKER SET (MD)
5873'
25. ACID,F~CTbRECEME~iSQ9EeZE, ETG:
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 150 Bbls of Diesel
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
Oll-Bsl
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
SUbmlf-~r~~Ç~B,~;,'~ none, state "none", R· E (~ E '\/E. 0
1 ,," . '-....... ".'«, ~ .
-2'ï3~bL/ JUt-·1 2 ?004
;;jf£ / RBOMS BfA. JUH @ 8 'lml" "0 -
Ala~~.ka Oil 3: G;:~s Cons. CûHhnl$SI(m
I1l1d,orage 0 RIG N A L
PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED -.ar... Oll-Bsl
Press. 24-HoUR RATE7
27,
None
Form 10-407 Revised 12/2003
GAs-McF
W A TER-BSl
GAs-McF
W A TER-Bsl
CONTINUED ON REVERSE SIDE
CHOKE SIZE
GAS-Oil RATIO
Oil GRAVITY-API (CORR)
Gç
)
)
28.
GEOLOGIC MARKERS
29.
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OA
6048'
4441'
None
Schrader Bluff OA
9149'
4461'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~ ~ ~ tiLl ~ Title Technical Assistant Date O(P ...o;¡ ..Dc.¡
PBU L-201 L3 204-049 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Michael Triolo, 564-5774
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
... .-- ---- - -.
.--- -- .- .-.. - . -. -.
. -- -~.. --- - ..- - - -, . - -- .-. -. - ... --.
BeuE~R6QR~ttON····
.. Leak-Off Test Summary
. ~ - - . - .
p:~gei1of 1·
Legal Name: L-201
Common Name: L-201
Test Date Test Type Test Depth (TMD) Test Depth (TV D) AMW Surface Pressure Leak Off pressure'·(BHP) ·EMW
3/21/2004 LOT 3,197.0 (ft) 2,642.0 (ft) 9.20 (ppg) 575 (psi) 1,838 (psi) 13.39 (ppg)
3/27/2004 FIT 7,047.0 (ft) 4,673.0 (ft) 9.20 (ppg) 680 (psi) 2,913 (psi) 12.00 (ppg)
4/5/2004 FIT 6,372.0 (ft) 4,562.0 (ft) 9.20 (ppg) 665 (psi) 2,845 (psi) 12.01 (ppg)
4/14/2004 FIT 6,229.0 (ft) 4,514.0 (ft) 9.20 (ppg) 660 (psi) 2,817 (psi) 12.01 (ppg)
-)
4/23/2004 FIT 6,025.0 (ft) 4,440.0 (ft) 9.30 (ppg) 646 (psi) 2,791 (psi) 12.10 (ppg)
..~
Printed: 5/312004 8:45:51 AM
')
)
pagè 1·· of 34
BP EXPLORATIÖN·
. ",' .
,. ." . ,"!.' ~ .. ..Jo. . _... '.
Oper.atiøn~~umm·ary. Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To Hours Task Code NPT Phase Description of .Opø~ations
3/16/2004 12:00 - 14:00 2.00 MOB P PRE Blow down steam and water lines. Rig down for move. Lay rig
mats on L-201
14:00 - 15:00 1.00 MOB P PRE Move camps and pits.
15:00 - 16:00 1.00 MOB P PRE Move rig off of L-211 and position on L-201
RIG ACCEPTED @ 16:00 hrs
16:00 - 19:30 3.50 RIGU P PRE NU diverter, riser and Hydril.
19:30 - 21 :30 2.00 RIGU P PRE Level rig and pits
21 :30 - 00:00 2.50 RIGU P PRE RU pits. Position Swaco unit and cuttings tank.
3/17/2004 00:00 - 01 :00 1.00 RIGU P PRE Load BHA #1 in pipe shed. Continue NU diverter, riser and
Hydril.
01 :00 - 04:30 3.50 RIGU P PRE Take on water and build spud mud. Change out riser
04:30 - 06:00 1.50 RIGU P PRE Change out top drive quill for 5" DP
06:00 - 07:00 1.00 RIGU P PRE PU Jewelry for BHA #1
07:00 - 10:30 3.50 RIGU P PRE MU 35 stands of 5" DP and stand back in derrick
10:30 - 12:00 1.50 RIGU P PRE MU HWDP and Collars, stand back in derrick.
12:00 - 17:30 5.50 RIGU P PRE Move 105 joints of 5" DP into pipe shed. MU 35 stands, stand
back in derrick.
17:30 - 18:30 1.00 RIGU P PRE MU BHA #1
18:30 - 19:00 0.50 BOPSUF P PRE Function test diverter. Witness of diverter test waived by John
Crisp with AOGCC.
19:00 - 19:30 0.50 RIGU P PRE Pre-spud meeting with Anadrill, MI, Sperry, GyroData and all
rig personnel.
19:30 - 20:00 0.50 RIGU P PRE RU Sperry WL unit and GyroData for gyro surveys.
20:00 - 21 :00 1.00 RIGU P PRE Finish MU BHA #1. Orient motor and MWD
21 :00 - 21 :30 0.50 DRILL P SURF RIH and tag up at 108'. Fill stack. Circulate mud system
checking for leaks.
21 :30 - 00:00 2.50 DRILL P SURF Drill 13-1/2" surface hole from 108' to 170'.
RPM = 50
Torque = 1.7k FtLb
GPM = 600 @ 500 psi
P/U 55k SIO 51 k ROT 53k
Run gyro survey every stand drilled.
ART = 0.25 hrs
SPUD @ 21 :30
3/18/2004 00:00 - 02:30 2.50 DRILL P SURF Drill 13-1/2" surface hole from 170' to 447'. Sliding 100% to
build angle
WOB = 2-20 klbs
GPM = 600 - 1006 psi on Btm, 765 psi off Btm
P/U 69k SIO 64k
Run gyro surveys at 170',196' and 447'
02:30 - 03:30 1.00 DRILL P SURF Stand back 3 stands to PU Jar stand. RIH to 447'
03:30 - 14:00 10.50 DRILL P SURF Drill 13-1/2" surface hole from 447' to 1570'. Sliding as required
to build angle and maintain azimuth.
WOB = 30-35klbs
RPM = 80
Printed: 51312004 8:46:01 AM
BPEXPLORATION
Operation~:..Sl.JlTtmå~Y:R.epørt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date., From:.. To Hours Task Code NPT Phase· Description·()t·Qp~ra.tions
3/18/2004 03:30 - 14:00 10.50 DRILL P SURF Torque off Btm = 2.3k FtLb, Torque on Btm = 7-9k FtLb
GPM = 750 @ 2050 psi on Btm, 1570 psi off Btm
P/U 87k S/O 80k ROT 82k
14:00 - 14:30 0.50 DRILL P SURF Circulate BU volume X 2
14:30 - 16:30 2.00 DRILL P SURF Monitor well - static. POH for new bit. started pulling over at
1100', pumped out to 950'. Stand back BHA and drop off
UBHO sub.
16:30 - 17:00 0.50 DRILL P SURF PU new HTC 13-1/2" MX-C1. Clean rig floor.
17:00 - 18:30 1.50 DRILL P SURF RIH to 1478'. MU top drive and wash last stand to bottom at
1570'.
18:30 - 00:00 5.50 DRILL P SURF Drill 13-1/2" surface hole from 1570' to 2360'. Sliding as
required to build angle and maintain azimuth.
WOB = 30-35klbs
RPM = 80
Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb
GPM = 750 @ 2200 psi on Btm, 1820 psi off Btm
P/U 100k SIO 84k ROT 90k
P/U 104k SIO 89k No Pumps
Backream each stand at drilling rate.
Intermittent gas hydrates from 1900' to 2360'
AST = 8.66 hrs.
ART = 3.49 hrs.
Formation tops:
SV4 - 1829' MD
Base of Permafrost - 1892' MD
SV3 - 2306' MD
SV2 - 2547' MD
3/19/2004 00:00 - 04:00 4.00 DRILL P SURF Drill 13-1/2" surface hole from 2360' to 3210'. Sliding as
required to build angle and maintain azimuth.
WOB = 35klbs
RPM = 80
Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb
GPM = 750 @ 2200 psi on Btm, 1990 psi off Btm
P/U 114k SIO 88k ROT 100k
Backream each stand at drilling rate.
Intermittent gas hydrates.
AST = 1.95 hrs.
ART = 0.84 hrs
Top of the SV1 @ 3050' MD
04:00 - 05:00 1.00 DRILL P SURF Circulate BU volume X 2. 770 gpm @ 2060 psi, reciprocate DP
at 100 rpm.
05:00 - 08:00 3.00 DRILL P SURF Monitor well - static. POH on short trip to HWDP. Overpulls to
25 klbs at 2050', 1850-1800', 1450'. Work each spot & clean
Printed: 51312004 8:46:01 AM
")
.\
E3R:EXPLORAIfIPN
,. " ' ",' "', -, ',' "".., .,....
····'.·º·p~·ra~·i,()º:$··..·S·lIri1...oo:~.ry:..·R~:pgr1,.·...
. ..... \'." ' '."~' , . :", ~ <.' : :. ',':.;" .'.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
., .", . ,. ,. , , , . .
.. ...." "".
,···Ré19§ 3·9t$4
. \"';" .
"",, '. '.
,,, ,',', " ,',; '.:. ".. ; ~ ..' ' :.'.:, '", :. ," ;"., .. ,,"':' . " . :
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Gode NPT
3/19/2004
05:00 - 08:00
3.00 DRILL P
SURF
08:00 - 09:30 1.50 DRILL P SURF
09:30 - 12:00 2.50 DRILL P SURF
12:00 - 14:30 2.50 DRILL P SURF
14:30 - 15:30 1.00 DRILL P SURF
15:30 - 16:30 1.00 DRILL P SURF
16:30 - 17:00 0.50 DRILL P SURF
17:00 - 17:30 0.50 CASE P SURF
17:30 - 19:30 2.00 CASE P SURF
19:30 - 20:00 0.50 CASE P SURF
20:00 ~ 00:00 4.00 CASE P SURF
3/20/2004 00:00 - 01 :00 1.00 CASE P SURF
01 :00 - 01 :30 0.50 CASE P SURF
01 :30 - 02:00 0.50 CEMT P SURF
02:00 - 04:00 2.00 CEMT P SURF
04:00 - 04:30 0.50 CEMT P SURF
04:30 - 05:20 0.83 CEMT P SURF
05:20 - 05:40 0.33 CEMT P SURF
05:40 - 06:40 1.00 CEMT P SURF
06:40 - 07:00 0.33 CEMT P SURF
07:00 - 07:30 0.50 CEMT P SURF
" " :."'- ':.:.,...::;.;'.,.....:' ',"':' ,': """. ':. ,':. .
:.':''': '''.''.''..,..''.'..,...''-...;........,........,.'''''''''.,....,'..,."".,,,.."',,.......,,....,,.
Ðèscriþtïohof0peráti~hS
up - OK.
Tight spot at 1400' - swabbing. Kelly up & circ @ 300 gpm/350
psi. Work up thru tight spot and precautionary circ up to 900' wi
minor pulls. Continue POH to HWDP.
RIH to bottom. Wipe minor tight spots at 1090' and
1300'-1500'.
Circ last stand to bottom and cond mud for casing & cement-
stage up to 770 gpm @ 2320 psi and 120 rpm. Reduce MW to
9.6 ppg & FV to 225.
Monitor well· static. POH to run csg. Tight spot at 2032' -
swabbing. MU top drive and circ @ 300 gpm/325 psi. Pump out
to 2140'. POH to 1325', tight spot - swabbing. Work thru. POH
with no more problems to HWDP.
Monitor well at HWDP - static. Stand back HWDP, Jars and
DC's
LD BHA #2
Clean and clear rig floor.
MU landing joint and make dummy run.
RU csg equipment
PJSM with MI, Nabors Casing and all rig personnel on running
10-3/4" surface casing.
MU shoe track and test float equipment. Run 76 jts 10-3/4·,
45.5#, L-80, BTC surface casing. Taking weight at 1100' work
through to 1200'. Break circulation on jt #40. Taking weight
again from 1920' to 2500' then clear to bottom.
25 bow spring centralizers on the collars of jts #1 and #3 thru
#26
Midnight depth - 2582'
Continue running 10-3/4·, 45.5# surface casing.
MU landing joint and land casing with shoe at 3197'.
RD fill-up tool and blow down top drive. RU cement head.
Circulate and condition hole for cement. Stage pumps to 10
bpm @ 760 psi. Reciprocate csg 5-10', P/U 152k Ibs S/O 96k
Ibs. No losses.
PJSM with OS, NAD, MI, Veco, BP prior to starting cement job.
Air up & prime up cementers. Mix & pump 5 bbls CW100
preflush. Test lines to 3500 psi. Pump remaining 15 bbls
CW100.
Mix & pump 70 bbls Mudpush II spacer at 10.2 ppg.
Release bottom plug. Mix & pump 480 bbls (605 sx) ArcticSet
Lite slurry at 10.7 ppg - 8.5 bpm @ 390 psi.
Switch to tail. Mix & pump 74 bbls (355 sx) Class G slurry at
15.8 ppg - 5 bpm @ 350 psi.
Release top plug and kick out with 10 bbls water from
cementers to clear lines. Switch to rig pumps and displace with
mud at 12 bpm @ 800 psi.
Getting good cement returns to surface 2000 strokes into
displacement.
Reciprocated pipe while pumping cement and 205 bbls into
displacement - then landed on ring for remainder of job.
Slow to 3 bpm for last 15 bbls displacement. Bump plug with
Printed: 51312004 8:46:01 AM
Page 4 of 34
BP . EXPLORATION
.;. ()peratiºnsSYl11l1)ary~eport.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Date
From-To :hlOlJfS Task Code NPT Phase
3/20/2004
07:00 - 07:30
0.50 CEMT P
SURF
07:30 - 08:00 0.50 CEMT P SURF
08:00 - 14:00 6.00 DIVRTR P SURF
14:00 - 20:30 6.50 BOPSUP P SURF
20:30 - 21 :00 0.50 BOPSUP P SURF
21 :00 - 00:00 3.00 BOPSUP P SURF
3/21/2004 00:00 - 00:30 0.50 BOPSUP P SURF
00:30 - 01 :00 0.50 BOPSUF P SURF
01 :00 - 03:30 2.50 DRILL P INT1
03:30 - 05:00 1.50 DRILL P INT1
05:00 - 06:00 1.00 CASE P SURF
06:00 - 07:30 1.50 DRILL P INT1
07:30 - 09:00 1.50 DRILL P INT1
09:00 - 10:00
1.00 DRILL P
INT1
10:00 - 11 :00
1.00 DRILL P
INT1
11 :00 - 12:30
1.50 DRILL P
INT1
12:30 - 13:00
0.50 DRILL N
FLUD INT1
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description··o.t··Qperations
1500 psi at 299.6 bbls total displacement. Bleed off pressure -
floats holding.
Full returns throughout pumping and displacing cement. Got
back 125 bbls good lead slurry. CIP at 07:30 hrs on 3/20104.
Flush flow line and stack. Blow down and RD cement lines. RD
cement head. Break out and LD landing joint.
ND diverter, riser and HydriL Move diverter line out of cellar.
NU speed head, tbg spool and BOP.
15:30 hrs - take on new 9.2# LSND mud
PJSM with all rig personnel on testing BOPE
Test BOPE to 250/3500 psi. Test annular to 250/3500 psi.
Witness of BOP test waived by Jeff Jones with AOGCC.
Continue testing BOPE 250/3500 psi
Pull test plug and install wear bushing. RD test equipment.
PU BHA #3,9-7/8" directional drilling assembly. Shallow test
MWD.
RIH to 2834'
Test 10-3/4" 45.5# casing to 3500 psi for 30 minutes.
Cut and slip 52' of drilling line. Service top drive.
Wash down from 2834', tag float collar at 3110'. Drill shoe track
and rat hole to 3210', continue drilling 20' of new hole to 3230'
RPM = 50
Torque = 7k FtLb
GPM = 580 @ 1360 psi
ROT 97k
Displace well to new 9.1 ppg LSND mud.
RPM = 50
GPM = 50 @ 1300 psi
ROT 97k
Perform LOT, EMW = 13.3 ppg. 575 psi surface pressure with
9.1 ppg mud at 2642' TVD. Calculated kick tolerance 149 bbls
Establish baseline ECD = 9.67 ppg
Drill 9-7/8" intermediate hole from 3230' to 3496', rotating 100%
WOB = 20 klbs
RPM = 80
Torque off Btm = 4.6k FtLb, Torque on Btm = 6-7k FtLb
GPM = 600 @ 1520 psi on Btm, 1190 psi off Btm
P/U 115k S/O 85k ROT 98k
Backream every stand at 600 gpm and 80 rpm, reducing flow
rate to 420 gpm on down stroke.
Calculated ECD = 9.66 ppg, Actual ECD = 10.30 ppg
POH 3 stands to shoe.
Skakers blinding off apparently due to oil wetting of bentonite in
new LSND mud. Blinding off of shakers required pump rate
reductions, unable to drill ahead.
Printed: 5/312004 8:46:01 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To . Hours Task Code NPT Phase Description of Ope~tio.ns
3/21/2004 13:00 - 17:00 4.00 DRILL N FLUD INT1 Circulate and condition mud at 50 gpm.
Screened down shakers and circulated until the blinding
problem was eliminated. Able to screen back up and circulate
at drilling rate
17:00 - 17:30 0.50 DRILL N FLUD INT1 RIH to 3400', wash to bottom at 3496'
17:30 - 18:30 1.00 DRILL P INT1 Stage up pumps and drill from 3496' to 3683'.
WOB = 15 klbs
RPM = 80
Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb
GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm
P/U 117k S/O 90k ROT 105k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg
18:30 - 19:30 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure on the top drive lube pumps.
Change out filter, regained oil pressure.
19:30 - 20:30 1.00 DRILL N RREP INT1 RIH to 3589', wash to bottom at 3683'
20:30 : 21 :00 0.50 DRILL N INT1 Stage up pumps and drill from 3683' to 3776'.
WOB = 15 klbs
RPM = 80
Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb
GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm
PIU 117k S/O 90k ROT 105k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg
AST = 0.23 hrs.
ART = 1.08 hrs.
21 :00 - 22:00 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure in the top drive lube pump
again.
22:00 - 00:00 2.00 DRILL N RREP INT1 Change out top drive lube pump.
3/22/2004 00:00 - 01 :00 1.00 DRILL N RREP INT1 Continue change out top drive lube pump.
01 :00 - 01 :30 0.50 DRILL N RREP INT1 RIH to 3686', wash last stand to bottom at 3776'
01 :30 - 00:00 22.50 DRILL P INT1 Stage up pumps and drill from 3776' to 5844'. Sliding as
required to maintain inclination and azimuth.
WOB = 15 klbs
RPM = 80
Torque off Btm = 6-7k FtLb, Torque on Btm = 8-16k FtLb
GPM = 650 @ 2060 psi on Btm, 1735 psi off Btm
P/U 148k S/O 110k ROT 130k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Opera1ionsSum maryBepprt
F»ftge.6of34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From-To Hours Task Code NPT Phase .... Description()fgper~~iºf")~·
3/22/2004 01 :30 - 00:00 22.50 DRILL P INT1 Calculated ECD = 9.87 ppg, Actual ECD = 10.00 ppg
AST = 5.89 hrs.
ART = 3.89 hrs.
Formation tops:
UG1 4775' MD, 3674' TVD
Ma 5300' MD, 4020' TVD
3/23/2004 00:00 - 17:00 17.00 DRILL P INT1 Directional drill from 5844' to 7055'. Sliding as required to
maintain inclination and azimuth.
WOB = 20-25 klbs
RPM = 80
Torque off Btm = 7-8k FtLb, Torque on Btm = 8-10k FtLb
GPM = 650 @ 2230 psi on Btm, 1993 psi off Btm
P/U 147k S/O 106k ROT 125k
Backream every stand at 650 gpm and 80 rpm, reducing flow
rate to 450 gpm on down stroke.
Calculated ECD = 10.02 ppg, Actual ECD = 10.37 ppg
AST = 1.88 hrs.
ART = 9.32 hrs.
Formation Tops:
OA 6048' MD 4441' TVD
OBa 6227' MD 4513' TVD
OBb 6372' MD 4560' TVD
OBd 6996' MD 4664' TVD
17:00 - 19:00 2.00 DRILL P INT1 Circulate BU vol X 2, 670 gpm @ 2106 psi, reciprocate DP at
120 rpm.
Calculated ECD = 10.02
Initial ECD = 10.42
ECD prior to POH = 10.19
19:00 - 20:00 1.00 DRILL P INT1 Monitor well - static. POH 15 stands to 5751', no problems
P/U 155k S/O 105k no pumps
20:00 - 21 :30 1.50 DRILL P INT1 Pump dry job and continue POH. Attempting to swab at 3451',
RIH to 3655'
21 :30 - 00:00 2.50 DRILL P INT1 Stage up pumps and begin backreaming from 3655'. Backream
out to 3451, attempting to pack off. RIH 1 stand to 3544'.
Attempt to backream, still packing off. RIH another stand to
3683', bring pumps up to 600 gpm watching for ECD spikes.
Able to circulate no problem, start backreaming out from 3683'
600 gpm @ 1247 psi and 85 rpm
Midnight depth 3582'
3/24/2004 00:00 - 00:30 0.50 DRILL P INT1 Continue backreaming out from 3582' to csg shoe at 3197'.600
gpm @ 1250 psi and 90 rpm
00:30 - 01 :00 0.50 DRILL P INT1 Pump hi-vis sweep around at csg shoe. 600 gpm @ 1200 psi
Printed: 5/312004 8:46:01 AM
I, ')
")
....".','.
:"-,
;i~,::·; :.
BRIEXP~QRA+IQN
:. .Q·p~råtion$· št)nlrriåty:B'~pºli:¡.:..·.
- '," .,' ',.' , ',." ".,.\.,"", ','-....:
. \:
:." :': ~. ,?>
. .'-. "'. :."..~ :
. .
·,::.i';:··..,:·
. ·····.··..¡·1'·
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Date
::':':'..:';:':.::.;,::,',:':,.\,::....
From-To Hours Task Code NPTPhase
3/24/2004
0.50 DRILL P
INT1
00:30 . 01 :00
01 :00 - 01 :30 0.50 DRILL P INT1
01 :30 . 03:30 2.00 DRILL P INT1
03:30 - 05:30 2.00 DRILL P INT1
05:30 - 06:30 1.00 DRILL P INT1
06:30 - 11 :00 4.50 DRILL P INT1
11 :00 : 12:00 1.00 DRILL P INT1
12:00 - 12:30 0.50 DRILL P INT1
12:30 - 15:00 2.50 DRILL P INT1
15:00 - 15:30 0.50 DRILL P INT1
15:30 - 16:30 1.00 BOPSUP P INT1
16:30 - 18:00 1.50 BOPSUP P INT1
18:00 - 20:00 2.00 CASE P INT1
20:00 - 20:30 0.50 CASE P INT1
20:30 - 00:00 3.50 CASE P INT1
3/25/2004 00:00 - 01 :30 1.50 CASE P INn
01 :30 - 02:00 0.50 CASE P INT1
02:00 - 12:00 10.00 CASE P INT1
12:00 - 12:30 0.50 CEMT P INT1
12:30 - 14:00 1.50 CEMT P INT1
14:00 -14:30 0.50 CEMT P INT1
14:30 - 17:00 2.50 CEMT P INn
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
,,', . , . ",',:. ':".,..:..'", ',-, ,:."",-;,;,.," .......:..:...'....
·ÒèSCriptio~·ór·åpe~t¡g~·;··;·····
and 80 rpm
Calculated ECD = 9.86
Actual ECD = 9.94
Service top drive
RIH to 7055, wash last stand down. No problems on RIH.
P/U 115k SIO 90k
Stage up pumps and circulate BU volume X 3. Circulate lo-hi
vis sweep surface to surface. 670 gpm @ 200 psi and 120 rpm.
P/U 147k SIO 106k ROT 125k
Torque = 10k FtLb
Calculated ECD = 9.93
ECD prior to POH = 10.03
MOnitor well - static. POH 10 stands to 6125'.
P/U 165k SIO 100k
Slug DP and continue POH laying down 5" DP.
RIH with 11 stands 5" DP from derrick
Continue LDDP
PJSM with Anadrill and all rig personnel on removing RA
source and laying down BHA. LD BHA #3, remove source from
ADN.
Clean and clear rig floor.
Flush stack and pull wear bushing.
Change top rams to 7-5/8". Install test plug and test door seals
to 3500 psi.
MU landing joint and make dummy run. RU 7-5/8" csg
equipment.
PJSM with Nabors Casing, MI and all rig personnel on running
7-5/8" csg.
MU and test float equipment. RUN 7-5/8", 29.7#, L-80, BTC-M
intermediate csg as per running orders.
Midnight depth 1696'
Continue Run 7-5/8", 29.7#, L-80 csg from 1696' to 3197' at 1
minute per jt. Break circulation every 20 jts.
Circulate 1.5 X csg vol at the 10-314" csg shoe. 7 bpm @ 350
psi. P/U 120k SIO 100k no pumps
Continue running 7·5/8" csg into open hole. 1 minutefJt above
5000', 1.5 minutef¡t below 5000'. Fill every jt, break circulation
every 5 jts, circulate for 15 minutes every 15 jts. and CBU
every 30 jts. Good displacement, no losses while running csg.
RD fill-up tool. RU cement head.
Stage up pumps and circulate and condition hole. Max rate 7
bpm @ 502 psi Reciprocate DP. P/U 225k SIO 110k
PJSM with Schlumberger, MI and all rig personnel on
cementing 7·5/8" csg.
Air up and batch up cementers. Pump 5 bbl CW-100. Test
lines to 3500 psi, pump remaining 20 bbls CW-100. Pump 45
Printed: 5/312004 8:46:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
BP EXPLORATION
Op~r~ti9ns SumlTlêJryReport
Page 8 of 34
L - 201
L -201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
3/25/2004
14:30 - 17:00
From .'" To Hours Task Code NPT
INT1
17:00 - 18:00
3/26/2004
18:00 - 19:30
19:30 - 20:00
20:00 - 22:00
22:00 - 00:00
00:00 - 13:00
13:00 - 14:00
14:00-15:00
2.50 CEMT P
1.00 CEMT P
INT1
1 .50 CASE P
0.50 WHSUR P
2.00 CEMT P
2.00 CEMT P
13.00 CEMT P
INT1
INT1
INT1
INT1
INT1
1.00 BOPSUF P
1.00 WHSUR P
INT1
INT1
15:00 - 19:30 4.50 BOPSUF P INT1
19:30 - 20:30 1.00 BOPSUF P INT1
20:30 - 22:00 1.50 BOPSUF P INT1
22:00 - 00:00 2.00 DRILL P PROD1
3/27/2004 00:00 - 01 :00 1.00 DRILL P PROD1
01 :00 - 04:30 3.50 DRILL P PROD1
04:30 - 05:00 0.50 DRILL P PROD1
05:00 - 07:30 2.50 DRILL P PROD1
07:30 - 09:00 1.50 CASE P INT1
09:00 - 11 :30 2.50 DRILL N WAIT PROD1
11 :30 - 13:00
13:00 - 14:00
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of ºp~rªti()p§
bbls 10.5 ppg Mud push. Drop bottom plug and pump 126 bbl
(589 sxs) 15.8 ppg Class-G cement. Drop top plug and kick out
with 10bbls water from cementers to wash up lines.
Switch to rig pumps and displace with seawater at 7 bpm, ICP
= 117 psi. Slow rate to 3 bpm to bring mud push around the
shoe then increase rate back to 7 bpm. Able to reciprocate
casing throughout cement job, land csg 290 bbls into
displacement. Slow rate to 3 bpm for the last 20 bbls of
displacement, FCP = 750 psi. Bump plugs with 1000 psi on
calculated strokes, floats holding. CIP 17:45
RD cement head. LD landing joint and RD csg equipment.
RILDS on packoff. Test packoff to 5000 psi.
change top drive quill to 4" HT -40, change out bails.
Clean mud and cement out from under rotary table.
PJSM with all rig personnel. Install wear bushing. PU 4" DP,
stand stands back in derrick. RU and inject 130 bbls 9.3 ppg
mud down the 10-3/4" X 7-5/8" annulus. Lot EMW = 13.5 ppg,
580 psi surface pressure and a shoe TVD of 2642'.
3bpm
ICP = 620 psi
FCP = 550 psi
SIP = 400 psi
Change top rams to 3-1/2" X 6" variables
RU Little Red, Test lines to 3500 psi. Inject 91 bbls dead crude
down 10-314" X 7-5/8" annulus.
ISP = 625 psi
FCP = 890 psi
SIP = 672 psi
RU and test BOPE 250/3500 psi. Witness of BOP test waived
by Chuck Sheave with AOGCC.
Pull test plug. RD test equipment. Install wear bushing.
PJSM with all rig personnel. Cut and slip 91' of drill line.
Service top drive, blocks and crown.
PU and MU BHA #4, 6-3/4" directional assembly.
Continue PU and MU BHA #4
RIH, picking up single joints of DP, to 4000'.
Function test MWD.
Continue RIH, picking up single joints of DP to 6892'. Wash
down and tag cmt at 6933'.
RU and test 7-5/8" csg to 3500 psi for 30 minutes.
Waiting on trucks for MOBM displacement.
Pull 9 stands of DP, Move 4" HT-40 HWDPin derrick to access
4" HT-38 HWDP. RIH with 4" HT-38 HWDP, POH Laying
down. RIH with 4" HT-40 HWDP.
PROD1 Pump 40 bbl MOBm spacer. Displace well to 9.2 ppg MOBM.
286 gpm @ 2500 psi.
PROD1 Drill shoe track, rathole and 20' of new hole to 7075'.
1.50 DRILL P
1.00 DRILL P
Torque off Btm = 3k FtLb, Torque on Btm = 4k FtLb
GPM =286 @ 2620 psi on Btm, 2500 psi off Btm
Printed: 5/312004 8:46:01 AM
- )
)
BPE><f?L..QRAI·l(::ltN ..
. . ': , , ".·.:,~,:,-:,i : ::"
,'. '", .",
·>'9perations. Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Hours . Task Code NPT . Phase
3/27/2004 13:00 - 14:00 1.00 DRILL P PROD1
14:00 - 14:30 0.50 DRILL P PROD1
14:30 - 15:30 1.00 DRILL P PROD1
Description of Operations
CBU
286 gpm @ 2500 psi
Perform 12.0 ppg EMW FIT. 680 psi, 9.2 ppg MOBM, 4673'
TVD.
15:30 - 18:00
2.50 DRILL P
Establish baseline ECD's
ECD = 10.23
PROD1 Directional drill from 7075' to 7358', sliding as required to build
angle and azimuth.
18:00 - 18:30
0.50 STKOH C
WOB = 5-15 klbs
RPM = 60
GPM = 280 @ 2900 psi on Btm, 2680 psi off Btm
PROD1 POH from 7358' to 7130' for geologic plug back.
21 :00 - 00:00
3.00 DRILL P
Well landed for horizontal section 6' TVD high to plan.
Estimated formation dip in prognosis -2 degrees, actual
formation dip <1 degree. The combination of these would have
resulted in the loss of the entire lower OBd sand. Town
engineering and geology staff were consulted and the decision
was made to open hole sidetrack at 7130'.
PROD1 Trench for sidetrack at 150 degrees right. Trench and drill from
7130' to 7358'.
PROD1 Directional drill from 7358' to 7555', sliding as required to build
angle and azimuth.
18:30 - 21 :00
2.50 STKOH C
WOB = 5-15 klbs
RPM = 65
Torque off Btm = 4.4k FtLb, Torque on Btm = 5.5k FtLb
GPM = 280 @ 2750 psi on Btm, 2430 psi off Btm
P/U 135k 8/0 82k ROT 104k
P/U 135k S/O 90k No pumps
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.22 ppg, Actual ECD = 10.77 ppg
3/28/2004
00:00 - 11 :00
11.00 DRILL P
AST = 1.63 hrs.
ART = 1.57 hrs.
PROD1 Directional drill from 7555' to 8280', sliding as required to
maintain angle and azimuth.
WOB = 8-15 klbs
RPM = 65
Torque off Btm = 5.4k FtLb, Torque on Btm = 6.5k FtLb
GPM = 280 @ 3100 psi on Btm, 2564 psi off Btm
P/U 134k S/O 83k ROT 108k
PIU 143k 8/0 92k No pumps
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke.
Printed: 51312004 8:46:01 AM
BP EXPLORATION
{)peratï'ons sulTÌtn..ªtVf.Îe,p()rt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L -201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From-To Hours Task Codè NPT Phase Ðescription·:of·Øperéltiºrì~
3/28/2004 00:00 - 11 :00 11.00 DRILL P PROD1
Calculated ECD = 10.55 ppg, Actual ECD = 11.13 ppg
11 :00 - 11 :30 0.50 DRILL P PROD1 Service #2 mud pump, loose cable on traction motor
11 :30 - 14:30 3.00 DRILL P PROD1 Directional drill from 8280' to 9093', sliding as required to
maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque off Btm = 5.9k FtLb, Torque on Btm = 7k FtLb
GPM = 280 @ 2950 psi on Btm, 2510 psi off Btm
P/U 141k SIO 79k ROT 107k
P/U 150k SIO 88k No pumps
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.61 ppg, Actual ECD = 10.90 ppg
14:30-15:30 1.00 DRILL P PROD1 Circulate and condition while correlating geologic data.
280 gpm @ 2510 psi and 70 rpm
15:30 - 21 :30 6.00 DRILL P PROD1 Directional drill from 9093' to 9870', sliding as required to
maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque off Btm = 6.5k FtLb, Torque on Btm = 7.7k FtLb
GPM = 280 @ 3150 psi on Btm, 2614 psi off Btm
P/U 148k S/O 69k ROT 107k
P/U 157k SIO 80k No pumps
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.66 ppg, Actual ECD = 11.24 ppg
AST = 3.03 hrs.
ART = 4.92 hrs.
21 :30 - 00:00 2.50 DRILL P PROD1 Condition hole for wiper trip to 7-5/8" csg shoe. Circulate BU
volume X 2. Pump 10 bbl base oil sweep surface to surface.
Circulate until ECD within 0.3 ppg of calculated.
296 gpm @ 2830 psi and 70 rpm
Calculated ECD = 10.37
ECD prior to wiper trip = 10.56
3/29/2004 00:00 - 01 :30 1.50 DRILL P PROD1 Monitor well- static. POH on wiper trip to 7-5/8" csg shoe. No
problems
01 :30 - 17:00 15.50 DRILL N RREP PROD1 PJSM with all rig personnel. Change out top drive wash pipe
and upper rotary seals.
17:00 - 17:30 0.50 DRILL P PROD1 Service top drive and blocks
17:30 - 19:30 2.00 DRILL P PROD1 RIH, work through tight spots at 8575' and 9230'. Wash last
stand to bottom at 9870'
19:30 - 20:00 0.50 DRILL P PROD1 Stage pumps to drilling rate, 280 gpm @ , and CBU
Printed: 5/312004 8:46:01 AM
')
)
, ·.t·[2R EXPI..Q.Ft~TI ON ........ '.>'
~: .,'. ',,: " , ."", " , . . ., ,',. , ..
. . . ." '. .
. ····;·..:·çip.e.rª~.i'()o.~,···..$.ø·.rn.m'~.ry·..m~.pºrt..·.
···Rag~;~rJ,:9f..3~
"'. "':;',,:'::1
":.:,.:,¡,;',.:.,, ..
:":1
.' ". ,',.. : ,'. '~~: ..,:'; ; '. "
:,0 :"'~ .: ':"': -:: . i' : .,,~~. :::\.,: :.: . :;
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
·>[j)él.té:,':'h;':Frô'rri;';';'Tfö", HoUrs >Task Code· NPT· pliasë
·[)èáö;iþti'~nofÔÞ'ê'~~hd;'~ ," '.""
3/29/2004
20:00 - 00:00
4.00 DRILL P
PROD1 Directional drill from 9870' to 10057', sliding as required to
maintain angle and azimuth.
WOB = 8-12 klbs
RPM = 70
Torque off Btm = 6.6k FtLb, Torque on Btm = 7.5k FtLb
GPM = 280 @ 3160 psi on Btm, 2660 psi off Btm
P/U 146k 8/080k ROT 107k
P/U 156k SIO 84k No pumps
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke.
Calculated ECD = 10.49 ppg, Actual ECD = 11.04 ppg
3/30/2004
00:00 - 10:00
10.00 DRILL P
A8T = 0.56 hrs.
ART = 0.34 hrs.
PROD1 Drill 6-3/4" directional hole from 10057' to 11364', sliding as
required to maintain angle and azimuth.
WOB = 10-12 klbs
RPM = 75
Torque off Btm = 7.9k FtLb, Torque on Btm = 9.0k FtLb
GPM = 280 @ 3600 psi on Btm with 500 psi differential
pressure
P/U 154k 8/0 62k ROT 100k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
10:00 -10:30
0.50 DRILL P
Calculated ECD = 10.72 ppg Actual ECD = 11.7 ppg
PROD1 Circulate to reduce ECD. Riciprocate & rotate (75 rpm) drill
string wihile circulating with 280 gpm @ 3050 psi.
ECD after Circulating = 11.32 ppg
PROD1 Drill 6-3/4" directional hole from 11364' to 11642', sliding as
required to maintain angle and azimuth.
10:30 - 12:30
2.00 DRILL P
WOB = 10-12 klbs
RPM = 75
Torque off Btm = 7.9k FtLb, Torque on Btm = 9.0k FtLb
GPM = 280 @ 3600 psi on Btm with 500 psi differential
pressure
P/U 154k S/O 62k ROT 100k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke.
12:30 - 14:00
14:00 - 16:00
1.50 DRILL P
2.00 DRILL P
Calculated ECD = 10.72 ppg Actual ECD = 11.82 ppg
PROD1 Circulate @ 11642' while evaluating geological well data.
PROD1 Drill 6-3/4" directional hole from 11642' to 11831', sliding as
required to maintain angle and azimuth.
WOB = 10-12 klbs
Printed: 51312004 8:46:01 AM
Page 12 of34
BP EXPLOBA TION
Qperati()ns SU01maryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
3/30/2004
14:00 - 16:00
16:00 - 19:00
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Hours · Task c;ode NPT Phase
2.00 DRILL P
PROD1
3.00 DRILL P
PROD1
19:00 - 20:00 1.00 DRILL P PROD1
20:00 - 21 :30 1.50 DRILL P PROD1
21 :30 - 22:00 0.50 DRILL P PROD1
22:00 - 00:00
3/31/2004
00:00 - 02:30
2.00 DRILL N
DFAL PROD1
2.50 DRILL N
DFAL PROD1
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Dª~cript¡pn of qþªrª~ions
RPM = 75
Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3290 psi on Btm with 280 psi differential
pressure
P/U 151k S/O 60k ROT 104k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg
Circulate & condition mud/hole for wiper trip. Circulate until
ECD within 0.3 ppg of calculated.
280 gpm @ 2890 psi and 75 rpm
Calculated ECD = 10.78 ppg
ECD prior to wiper trip = 11.08
POOH for wiper trip from 11831' to 9590' (24 Stds) with no
problems. Hole in good condition. Max drag 15k.
TIH to 11736' with no problems. M/U TDS. Establish
circulation. Precautionary wash & ream to bottom with no
problems. No fill on bottom.
Drill 6-3/4" directional hole from 11831' to 11856', sliding as
required to maintain angle and azimuth. Had a fair amount of
drill cuttings come over shakers on bottoms up from wiper trip.
Note: Gamma-Ray tool generating incorrect data.
WOB = 10-12 klbs
RPM = 75
Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3290 psi on Btm with 280 psi differential
pressure
P/U 151k S/O 60k ROT 104k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg
Drilling Time last 24 Hrs= 5.68 hrs
ART = 3.12 Hrs AST = 2.56 Hrs. Survey & Connection time =
8.82 Hrs
Circulate while trouble shooting problem with MWD-GR tool.
Backream up one stand to correlate MWD data. Gamma
Counts prior to having problem was reading 80 CPS. Currently
reading 10 CPS. Unable to rectify MWD-GR tool problem.
Failure unknown at this time.
Circulated 2 x bottoms-up from 11856' @ 280 gpm with 2880
psi.
Calculated ECD =10.85 ppg Actual ECD after circulating =
11.06 ppg
POOH (Due to MWD tool failure) to 7-5/8" casing shoe with no
problems. Hole in good condition. Flow check @ shoe. Well
Printed: 5/312004 8:46:01 AM
)
)
:. ,.,.".:.' .:.,~"",. ,
.. .
e~gg,;~.·a:Qt~:?t.·.·.
.' '.
,·····;¡·'I3R:·,EXPL.0BATION..··········
:"":':-'.:,:"..'.',',:'.,;;,":;.:...',,,,',:., ',' .,-':.:. :-':.:': ,',,, ,". ,:'.',
... ,., ". ..... ,",. ..,', . .. < ",:.";:¡
. ". ,'" ',": ,,": ,',.' " ,,'. ,'" ",' . " ., :' , '" .
;op~r,~Hons'sÙmli1åry'Repårt' .
.' ".;' ~ .
Drilling Time last 24 Hrs= 2.15 hrs
ART = 1.08 Hrs AST = 1.07 Hrs. Survey & Connection time =
2.85 Hrs
PROD1 Circulate @ 12327' while evaluating geological well data.
Note: Due to a unaccceptable amount of pay zone drilled, a
decision was made by the BP Drilling department to perform a
Open Hole sidetrack at 10585' MD. Circulate hole clean (2 x
Btm-up vol) with 280 gpm @ 2870 psi. Reciprocate & rotate
drill string (75 RPM) while circulating.
ECD after circulating: Calculated ECD = 10.90 Actual ECD =
11.20.
P/U 155k S/O 59k Rot Wt 103k
Flow check. Well static. Blow down TDS. POOH for Open-hole
Sidetrack from 12327' to 11453'-midnight depth. Hole in good
shape. Max drag 15k.
POOH from 11453' to 10565' for Open-hole Sidetrack. Hole in
good shape. Max drag 15k.
Break circulation. Stage pumps to 280 gpm wI 2730 psi. Orient
TF to 140 deg lHS for Open Hole Sidetrack. Start trenching
from 10565' to 10585'. NOTE: AIM tool quit working.
Circulate & work drill string @ 10585' while trouble shooting
problem with AIM Tool. Unable to rectify problem.
.. ' ..... .', ,':~ <: c,;: :: . ""
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
f~purs Task Code· NPT Phase
3/31/2004 00:00 - 02:30 2.50 DRILL N DFAL PROD1
02:30 - 05:00 2.50 DRILL N DFAL PROD1
05:00 - 05:15 0.25 DRILL N DFAL PROD1
05: 15 - 07:00 1.75 DRILL N DFAL PROD1
07:00 - 07:30 0.50 DRILL N DFAL PROD1
07:30 - 07:45 0.25 DRILL N DFAL PROD1
07:45 - 09:30 1.75 DRilL N DFAL PROD1
09:30 - 12:00 2.50 DRILL N DFAL PROD1
12:00 - 13:00 1.00 DRILL N DFAL PROD1
13:00 - 15:00 2.00 DRILL N DFAL PROD1
15:00 - 16:00 1.00 DRILL N DFAL PROD1
16:00 - 21 :00 5.00 DRILL P PROD1
21 :00 - 23:30
2.50 DRILL C
23:30 - 00:00 0.50 DRilL C PROD1
4/1/2004 00:00 - 00:30 0.50 DRILL C PROD1
00:30 - 01 :30 1.00 STKOH C PROD1
01 :30 - 02:30 1.00 STKOH X DFAl PROD1
:. ""~,,: :,: "
.. ...':,..... ':,'. ','. '."'.'"..",
¡,:{:~: !:;·Ak:~,j}?~¡:;:;·~/!F;,::::: ::'.': ~
.,.,',
;,:.\:X<H,::j~~n;~;~;;,; :": ',,:.~, :',: :':"::": : :,,~.
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of Operation~,·"
static.
Continue POOH with drill string to top of BHA.
SAFETY --- Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
Stand back Jars & NMDC's. Unload RA Source from LWD. UD
MWD-LWD tool. Check mud-motor & bit (Bit in like new
condition). Down-load MWD.
Clean Rig Floor.
SAFETY --- Held PJSM with Anadrill and all Rig personnel
regarding picking up BHA & loading RA source.
M/U 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK.
TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7032'.
Service TDS. Slip & cut 78' of Drill Line. Reset & check C-O-M.
Check brake system.
Continue TIH to 11600' with no problems.
M/U TDS. Establish circulation. Stage pumps to 280 gpm with
2520 psi + 70 rpm. Perform MADD PASS from 11600'-11856'.
Drill 6-3/4" directional hole from 11856' to 12327', sliding as
required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 75
Torque off Btm = 8.0k FtLb, Torque on Btm = 10k FtLb
GPM = 280 @ 3480 psi on Btm with 200 psi differential
pressure
P/U 155k S/O 59k ROT 103k
Backream every stand at 280 gpm and 75 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.90 ppg Actual ECD = 11.39 ppg
Printed: 51312004 8:46:01 AM
BPEXPLORATION
Op~rations·SummaryR~port
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Date From-To Hours Task Gode ·NPT Phase
4/1/2004 02:30 - 04:00 1.50 STKOH X DFAL PROD1
04:00 - 06:30 2.50 STKOH X DFAL PROD1
06:30 - 06:45 0.25 STKOH X DFAL PROD1
06:45 - 09:00 2.25 STKOH X DFAL PROD1
09:00 - 14:00 5.00 BOPSUPX DFAL PROD1
14:00 - 14:15 0.25 STKOH X DFAL PROD1
14:15 - 15:30 1.25 STKOH X DFAL PROD1
15:30 . 18:00 2.50 STKOH X DFAL PROD1
18:00 - 19:30 1.50 STKOH X DFAL PROD1
19:30 - 21 :00 1.50 STKOH X DFAL PROD1
21 :00 - 21 :30 0.50 STKOH X DFAL PROD1
21 :30 - 00:00 2.50 DRILL C PROD1
4/212004
14.42 STKOH C
00:00 - 14:25
PROD1
Page 140f~4
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Descripti()Q.Qfgperªíiqpê
POOH from 10585' to 7-5/8" Casing Shoe @ 7047' with no
problems. Hole in good condition. Flow check @ shoe. Well
static.
Continue POOH from 7047' to top of BHA.
SAFETY --- Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
Stand back Jars & NMDC's. Remove RA Source. UD
MWD-LWD tool, mud-motor & bit (Bit in good condition).
Held PJSM. Pull wear bushing. Run BOP Test Plug on 4" DP.
Rig Up Testing Equipment - Test BOP & Related Surface
Equipment: Test Annular, Upper And Lower Pipe Rams, Blind
Rams, Manual & HCR Valves on C/K Lines, Choke Manifold,
TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP
Valves At 250 Psi. Low And 3,500 Psi. High. Perform
Accumulator Test. Blow down lines. Rig Down testing
Equipment
The BOP Test witnessed By AOGCC Inspector John Crisp.
SAFETY --- Held PJSM with Anadrill and all Rig personnel
regarding picking up BHA & loading RA source.
M/U 6-314" Steerable Drilling assembly (BHA #6). Shallow test
MWD-OK.
TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7-5/8"
Casing Shoe @ 7047'.
Service TDS. Slip & cut 37' of Drill Line. Reset & check C-O-M.
Check brake system.
Continue TIH to 10522' with no problems.
M/U TDS. Establish circulation. Stage pumps to 280 gpm with
2820 psi. Wash down to 10565'. Orient TF to 140 deg LHS for
Open Hole Sidetrack 02. Trench from 10565' to 10585'.
Sidetrack well & Drill 6-314" directional hole from 10585' to
10615', sliding as required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb
GPM = 280 @ 2820 psi on Btm with 100 psi differential
pressure
P/U 153k S/O 83k ROT 105k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.00 ppg Actual ECD = 10.96 ppg
Drilling Time last 24 Hrs= 1.79 hrs
ART = 0.60 Hrs AST = 1.19 Hrs. Survey & Connection time =
0.71 Hrs
Drill 6-3/4" directional hole from 10615' to 12327', sliding as
required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 70
Torque off Btm = 7.9k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3500 psi on Btm with 250 psi differential
pressure
Printed: 5/312004 8:46:01 AM
)
)
...gi:Ì9~1·.?·.ºfBf1-
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
'Houts .. Task:GqåEt NRT Phase,
..' "-",-. .." ,: ;'.,.. ,,' '",,','; ":..'-.'.........,....,.,'.
'." .." ".",.. ".. ".,." , ." ,,,', ,", ,. ""'.'"
" '. " ' ,,- ',., ',',"
Dêscription of Oþerati()f1~
.."'.:
4/2/2004
00:00 - 14:25
14.42 STKOH C
PROD1 P/U 150k S/O 52k ROT 103k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
14:25 - 17:45 3.33 STKOH C PROD1
17:45 - 19:00 1.25 DRILL P PROD1
19:00 - 19:30 0.50 DRILL P PROD1
Calculated ECD = 10.90 ppg Actual ECD = 11.85 ppg
Drill ahead in 63/4" hole from 12327' to 12732' MD (original
depth). Drilling parameters as above.
Circulate to reduce ECD. Reciprocate & rotate (70 rpm) drill
string wihile circulating with 280 gpm @ 3230 psi.
ECD after Circulating = 11.32 ppg
Drill6-3/4M directional hole from 12732' to 12800', sliding as
required to maintain angle and azimuth.
19:30 - 20:00
0.50 DRILL P
Calculated ECD = 10.93 ppg Actual ECD = 11.72 ppg
PROD1 Circulate @ 12800' to reduce ECD. Riciprocate & rotate (70
rpm) drill string wihile circulating with 280 gpm @ 3230 psi.
ECD after Circulating = 11.30 ppg
PROD1 Drill 6-314" directional hole from 12800' to 13073', sliding as
required to maintain angle and azimuth.
WOB = 10-18 klbs
RPM = 70
Torque off Btm = 6.0k FtLb, Torque on Stm = 7k FtLb
GPM = 280 @ 3500 psi on Btm with 250-300 psi differential
pressure
P/U 150k SIO 52k ROT 103k
20:00 - 00:00
4.00 DRILL P
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 11.26 ppg Actual ECD = 11.77 ppg
4/3/2004
00:00 - 05:00
5.00 DRILL P
On Bottom Drilling Time last 24 Hrs= 10.73 hrs
ART = 5.29 Hrs AST = 4.81 Hrs. Survey & Connection time =
11.52 Hrs
PROD1 Drill 6-3/4" directional hole from 13073' to 13580'. Sliding as
required to maintain angle and azimuth.
WOS = 5-15 klbs
RPM = 70
Torque off Stm = 8.2k FtLb, Torque on Btm = 10-11 k FtLb
GPM = 280 @ 3520 psi on Btm with 250-300 psi differential
pressure
P/U 156k S/O 56k ROT 103k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30',
05:00 - 06:00
1.00 DRILL P
Calculated ECD = 10.90 ppg Actual ECD = 11.64 ppg
PROD1 Circulate to reduce ECD. Riciprocate & rotate (70 rpm) drill
string wihile circulating with 280 gpm @ 3140 psi.
ECD after Circulating = 11.15 ppg
PROD1 Drill 6-314" directional hole from 13580' to 13698' TO. Sliding as
required to maintain angle and azimuth.
06:00 - 07:00
1.00 DRILL P
Printed: 51312004 8:46:01 AM
BP EXPLORATION
·C)perªtipl1~.·.SlJrrimðr,Y·.:Rgport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L -201
L -201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Paget 6 of 34
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
4/3/2004
06:00 - 07:00
FrÞnl..'fo Hours¡rask Code· NPT
Description of Op~rªtions
07:00 - 12:00
12:00 - 15:30
15:30 - 16:30
16:30 - 19:30
19:30 - 23:00
1.00 DRILL P
PROD1
5.00 DRILL P
PROD1
3.50 DRILL P
PROD1
1.00 DRILL P
3.00 DRILL P
3.50 DRILL P
PROD1
PROD1
PROD1
23:00 - 00:00 1.00 DRILL P PROD1
4/4/2004 00:00 - 04:30 4.50 DRILL P PROD1
04:30 - 05:30 1.00 DRILL P PROD1
05:30 - 08:30 3.00 DRILL P PROD1
08:30 - 08:45 0.25 DRILL P PROD1
08:45 - 10:30 1.75 DRILL P PROD1
10:30 - 11 :00 0.50 DRILL P PROD1
11 :00 - 11 :30 0.50 CASE P COMP
WOB = 5-15 klbs
RPM = 70
Torque off Btm = 8k FtLb, Torque on Btm = 11 k FtLb
GPM = 280 @ 3500 psi on Btm with 250-300 psi differential
pressure
P/U 150k S/O 52k ROT 103k
Backream every stand at 280 gpm and 70 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.90 ppg Actual ECD = 11.40 ppg
On Bottom Drilling Time = 2.27 hrs
ART = 1.8 Hrs AST = 0.47 Hrs. Survey & Connection time =
3.73 Hrs
Circulate & condition mud/hole from 13698'. Increase pump
rate to 300 gpm with 3425 psi. Pump 25 bbl Lo-Vis sweep.
Circulate hole clean (4.5 x Btms-up). Reciprocate & rotate (100
rpm) while circulating. Flow check. Well static. Pump slug.
Calculated ECD = 10.88 ppg
ECD prior to Wiper Trip = 11.09 ppg
POOH (Wiper Trip) to 7-5/8" Casing Shoe @ 7047'. Had one
tight spot @ 11880'. Max over-pull = 35k. Worked through
same with no other problems. Hole in good condition. Average
drag 10-15k
P/U 170k S/O 63k Off bottom with no pump.
Service TDS.
TIH with drill string to 13602' with no problems.
M/U TDS. Establish circulation. Precautionary wash & ream to
bottom @ 13698' with no problems. Circulate & condition
mud/hole from 13698'. Increase pump rate to 300 gpm with
3350 psi. Circulate hole clean (3.5 x Btms-up). Reciprocate &
rotate (100 rpm) while circulating.
Calculated ECD = 10.96 ppg
ECD prior to Wiper Trip = 11.09 ppg
Flow check. Well static. Pump slug. POOH to run 4.5" Slotted
Production Liner.
P/U 160k S/O 75k Off bottom with no pump.
POOH from 13231' to 7000' (7-5/8" Shoe @ 7047') with no
problems. Hole in good condition. Max Drag 5-10k.
Drop Circ-Sub opening dart. Break circulation, pump dart on
seat. Open eire-sub (Placed @ 175' above bit) with 1800 psi.
Stage pumps to 575 gpm with 3380 psi. Reciprocate & rotate
(70 RPM) while circulating from 6825'. No drilling cuttings
observed from Btms-up. Flow check. Well static. Pump slug.
Continue POOH from 7000' to top of BHA.
SAFETY--- Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
Remove RA Source. UD Anadrill Directional tools.
Clean Rig Floor.
RIU 4.5" Casing tongs & Liner Running equipment.
Printed: 5/312004 8:46:01 AM
)
")
CaMP SAFETY --- Held PJSM with rig crew & BOT personnel
regarding running liner & P/U Liner Hanger-Packer assembly.
CaMP M/U 4-1/2" Guide Shoe Jt + 159 Jts of 4-1/2" 12.6# L-80
IBT-M slotted liner + 14 Jts of 4.5" 12.6# L-80 IBT-M solid
liner & BOT "Flex-Lock" Liner Hanger wI ZXP Liner Top
Packer. Total length = 7240.49'
Liner String wt = 55k.
COMP RIH with 4-1/2" 12.6# Slotted liner assembly on 4" DP to
13680' with no problems. P/U & place 4.5" Liner Shoe @
13672' .
P/U 165k SIO 69k
CaMP Drop 29/32" setting ball down DP. Pump on seat @ 4 bpm wI
600 psi. Once ball seated increased pressure to 2000 psi to set
"Flex-Lock" Liner Hanger. SIO 35k on Hanger. Continue
pressuring up to 3000 psi to set ZXP Packer. Pressure up to
4000 psi . Ball seat did not shear. P/U 12' above TBR &
release packer setting dogs. Set 50k on ZXP packer to ensure
proper setting. The 4.5" Slotted Liner Shoe set @ 13672' with
top of liner @ 6432'.
P/U on string placing end of DP @ 6358'. CBU @ 7 bpm wI
1520 psi. Flow check. Pump slug.
POOH from 6358' with 4" DP.
Finish POOH from 4700' with 4" DP. UD BOT Liner Hanger
Running Tool. Clear & clean Rig Floor.
Slip & cut 93' of drill line. Reset & check C-O-M. Adjust
brakes. Service TDS.
SAFETy---- Held PJSM with Rig Crew, Baker Oil Tools Rep &
Anadrill personnel regarding P/U Whipstock + BHA.
M/U L 1 (OBb) Whipstock assembly. Orient with MWD. P/U 9 x
4-3/4" DC. RIH with 4" HWDP.
POOH from 1100' to change Whipstock spaceout. UD 1 Jt of
3.5" HWDP & Flex Jt. M/U Whipstock. Reorient with MWD.
Shollow test MWD-OK.
TIH with L 1 Whipstock assembly on 4" DP to 6398' (End of
seals on Spaceout assembly).
M/U TDS. Estabish circulation. Orient whipstock 15 deg LHS.
Stab dummy seal assembly into Top of tie-back sleeve (11'
sleeve) @ 6432'. Set down 20k to set whipstock anchor. P/U
10k over to verify anchor set. Set down 40k to shear whipstock
lug.
WEXIT Attempt to pressure test 7-5/8" casing to 1000 psi-Bleeding off.
Check all surface equipment. Found no surface leaks.
Attempted to test several times. Pressure bled off to 700 psi &
holding. Consult with ODE. Consensus was to continue as per
program.
WEXIT Mill Window in 7-5/8" casing from 6372 to 6384' and drill 14' of
new hole to 6398'. Work mills through window with no
problems.
NOTE: Window cut in 7-5/8" csg FI 6372' to 6384'
WOB = 2-12k
RPM = 70-114
Torque = 6500 KFtLb
GPM = 250 @ 1500 psi
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
:t:)~tei':FrOR1+;roJrlOl,Jr$,;Task Code NPT . Phase
4/4/2004
11 :30 - 12:00
0.50 CASE P
12:00 - 18:00
6.00 CASE P
18:00 - 21 :00
3.00 CASE P
21 :00 - 22:00
1.00 CASE P
22:00 - 23:00 1.00 CASE P COMP
23:00 ~ 00:00 1.00 CASE P COMP
4/5/2004 00:00 - 02:30 2.50 CASE P COMP
02:30 - 04:00 1.50 CASE P CaMP
04:00 - 04:15 0.25 STWHIP P WEXIT
04:15 - 07:00 2.75 STWHIP P WEXIT
07:00 - 12:00 5.00 STWHIP N HMAN WEXIT
12:00 - 14:30 2.50 STWHIP P WEXIT
14:30 - 15:00 0.50 STWHIP P WEXIT
15:00 - 16:00
1.00 STWHIP P
16:00 - 20:00
4.00 STWHIP P
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
DescriptiQn of ..operations
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Operation~SummarY Report
Page .1.8 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
DatØ From·-To Hours Task Code NPT Phase [)~scriptionof Opërations
4/5/2004 16:00 - 20:00 4.00 STWHIP P WEXIT P/U 129k S/O 92k Rotate Wt = 101 k
20:00 - 21 :00 1.00 STWHIP P WEXIT Pump Hi-vis sweep & circulate hole clean from 6398' wI 290
gpm @ 1800 psi. Reciprocate & rotate drill string (110 RPM)
while circulating.
21 :00 - 21 :30 0.50 STWHIP P WEXIT Periorm FIT. Pressure up on formation to 665 psi with 9.2 ppg
MOBM @ 4562' TVD = 12.0 ppg EMW. Flow check. Well
static. Pump slug. Blow down TDS & related equipment.
21 :30 - 00:00 2.50 STWHIP P WEXIT POOH with Mill Assy & 4" DP to top of BHA.
4/6/2004 00:00 - 01 :30 1.50 STWHIP P WEXIT UD 9 x 4-3/4" DC, BOT mills & related equipment. Clear rig
floor of excess whipstock milling equipment.
01 :30 - 02:30 1.00 STWHIP P WEXIT MIU ported sub. Flush out BOP's. UD sub. Blow down TDS,
CIK Lines & all Suriace equipment in preparation for BOP Test.
Pull wearbushing.
02:30 - 06:30 4.00 BOPSUP P WEXIT Held PJSM. RIH with BOP Test Plug on 4" DP & seat in
wellhead. Rig Up Testing Equipment - Test BOP & Related
Suriace Equipment: Test Annular, Upper And Lower Pipe
Rams, Blind Rams, Manual & HCR Valves on C/K Lines,
Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper &
Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. RID
Test Equipment. Pull test plug. Install wearbushing. Blow down
suriace lines.
Witness Of BOP Test Waived By AOGCC Inspector John
Spaulding.
06:30 - 07:00 0.50 DRILL P WEXIT SAFETY--- Held PJSM with Rig Crew & Anadrill personnel
regarding picking up BHA tools & installing RA Source.
07:00 - 09:00 2.00 DRILL P WEXIT M/U (L 1, OBb) 6-3/4" Steerable Drilling assembly. Shallow test
MWD-OK.
09:00 - 12:00 3.00 DRILL P WEXIT TIH with 6-3/4" Drilling assembly on 4" DP to 6350'.
12:00 - 12:30 0.50 DRILL P WEXIT MIU TDS. Establish circulation. Orient MWD TF to 15 deg LHS
to exit window. Stop pumps. Slack off & exit window. RIH (L 1
lateral) to 6388' without any problems. Establish baseline ECD
of 10.49 ppg @ 280 gpm + 70 rpm. Wash & ream from 6388' to
6398'.
12:30 - 00:00 11.50 DRILL P PROD2 Drill 6-3/4" directional hole from 6398' to 7638'. Sliding as
required to maintain angle and azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 4.5k FtLb, Torque on Btm = 7.0k FtLb
GPM = 280 @ 2750 psi on Btm with 300-375 psi differential
pressure
P/U 125k S/O 80k Rot Wt 95k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.40 ppg Actual ECD = 10.9 ppg
On Bottom Drilling Time last 24 Hrs= 7.42 hrs
ART = 4.52 Hrs AST = 2.9 Hrs. Survey & Connection time =
4.08 Hrs
4/7/2004 00:00 - 15:00 15.00 DRILL P PROD2 Drill 6-3/4" directional hole from 7638' to 9559'. Sliding as
required to maintain inclination and azimuth.
WOB = 10-15 klbs
Printed: 5/312004 8:46:01 AM
)
)
BR.EXP4PRJ\TtON
" -,,,,::,,:;t:,,,·,
Operations·.~U.mmª~¥>:Røpºrt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/1 6/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date
From - To Hours Task Code· NPT Phase
Description of Operati0':1s
4n /2004
00:00 - 15:00
15.00 DRILL P
PROD2 RPM = 65
Torque off Btm = 5.5k FtLb, Torque on Btm = 8.0k FtLb
GPM = 280 @ 3100 psi on Btm with 300-375 psi differential
pressure
P/U 141k SIO 72k Rot Wt 103k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
15:00 - 18:30
3.50 DRILL P
Calculated ECD = 10.72 ppg Actual ECD = 11.23 ppg
PROD2 Circulate & condition mudlhole prior to wiper trip from 9559'.
Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (75
rpm) while circulating.
Flow check. Well static. Pump slug.
23:00 - 00:00
1.00 DRILL P
Calculated ECD = 10.76 ppg
ECD prior to Wiper Trip = 10.86 ppg
PROD2 Wiper trip. POOH to 6368' (7-5/8" window @ 6372'-6384') with
no problems. Max drag 25k. Average drag 10-15k.
PROD2 Service TDS. Change out Actuator on Lower IBOP valve.
PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit
window. Stop pumps. Slack off & exit window. TIH (L 1 lateral)
to 9466' with no problems. M/U TDS. Precautionary wash &
ream to bottom. No fill. Pump 20 bbl Lo-vis sweep.
PROD2 Drill 6-3/4" directional hole from 9559' to 9589'. Sliding as
required to maintain inclination and azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 5k FtLb, Torque on Btm = 7.5k FtLb
GPM = 280 @ 3100 psi on Btm with 300-375 psi differential
pressure
P IU 140k SIO 72k Rot Wt 103k
18:30 - 20:00
1.50 DRILL P
20:00 - 21 :30
21 :30 - 23:00
1.50 DRILL P
1.50 DRILL P
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 10.76 ppg Actual ECD = 11.23 ppg
4/8/2004
00:00 - 22:00
22.00 DRILL P
On Bottom Drilling Time last 24 Hrs= 5.88 hrs
ART = 3.63 Hrs AST = 2.25 Hrs. Survey & Connection time =
10.12 Hrs
PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 9589' to
12172'. Sliding as required to maintain inclination and azimuth.
**** NOTE: Drilled out the top of the OBb Zone ****
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3350 psi on Btm with 300-400 psi differential
pressure
PIU 149k SIO 62k Rot Wt 97k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Printed: 51312004 8:46:01 AM
BPEXPLORATION
Qpf:}räti()f1~Summ~rY· Report
Page· 20þf 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L -201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/1 6/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From-To HQurs ,-a~* Code NRT Phase
4/8/2004 00:00 - 22:00 22.00 DRILL P PROD2
Description of Op~ratiQns
Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg
22:00 - 22:15 0.25 STKOH C PROD2
22:15 - 00:00 1.75 STKOH C PROD2
4/9/2004 00:00 - 02:00 2.00 STKOH C PROD2
On Bottom Drilling Time last 24 Hrs= 7.94 hrs
ART = 4.9 Hrs AST = 3.04 Hrs. Survey & Connection time =
14.06 Hrs
POOH (2 Stds) to 11933' for Geological Sidetrack after exiting
the top of the OBb sand.
Break circulation. Stage pumps to 280 gpm wI 2800 psi. Orient
TF to 135 deg RHS for Open Hole Sidetrack. Start trenching
from 11933' to 11953'.
Perform open hole sidetrack in the L 1 (OBb) lateral. Time drill
from 11953' to 11963'.
02:00 - 05:30
3.50 STKOH C
WOB = 0-2k
GPM = 280 @ 2800 psi
P/U 149k S/O 62k Rot Wt 97k
PROD2 Drill 6-3/4" directional hole in the L1 (OBb) lateral from 11963'
to 12172' (original depth). Sliding as required to maintain
inclination and azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb
GPM = 280 @ 3350 psi on Btm with 300-400 psi differential
pressure
P/U 149k. 8/0 62k. Rot Wt 97k.
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
05:30 - 19:45
14.25 DRILL P
Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg
PROD2 Continue drilling 6-3/4" L 1 lateral from 12172' to 13540' TD I
4565' TVD. Sliding as required to maintain inclination and
azimuth.
WOB = 10-15 klbs
RPM = 65
Torque off Btm = 8k FtLb, Torque on Btm = 9-12k FtLb
GPM = 280 @ 3300 psi on Btm with 300-350 psi differential
pressure
P/U 161 k S/O 48k Rot Wt 100k
Backream every stand at 280 gpm and 65 rpm, reducing flow
rate to 210 gpm on down stroke. Survey every 30'.
Calculated ECD = 11.05 ppg Actual ECD = 11.55 ppg
19:45 - 23:00
3.25 DRILL P
On Bottom Drilling Time last 24 Hrs= 7.7 hrs
ART = 3.7 Hrs AST = 4.0 Hrs. Survey & Connection time =
12.30 Hrs
PROD2 Circulate & condition mudlhole prior to wiper trip from 13540'.
Circulate hole clean (3 x Btms-up). Reciprocate & rotate (100
rpm) while circulating.
Flow check. Well static.
Printed: 5/312004 8:46:01 AM
)
)
.....·..·Page.·.2töfà4..
BP>SX,PLQ8AIIQN ..
.. ····ºp'ªtª~~C)n<~,.·..:sUmfhªry·Røf:i()rt.·
Calculated ECD = 10.96 ppg
ECD prior to Wiper Trip = 11.01 ppg
Wiper trip. POOH to 12606' with no problems. Max drag 20k.
Average drag 10-15k. P/U Off Btm no pump = 175k S/O 60k.
Continue wiper trip. POOH from 12606' to 6368' (7-5/8" window
@ 6372'-6384') with no problems. Max drag 25k @ 10679'.
Average drag 10-15k.
Slip & cut 71' of drill line. Reset & check C-O-M. Check
Drawworks brakes. Service TDS.
Break circulation. Orient MWD TF to 15 deg LHS to exit
window. Stop pumps. Slack off & exit window. TIH to 13475'.
Encountered tight hole from 10730' to 10965' & at 11830' with
25k down drag. Work through same with no other problems.
PROD2 M/U TDS. Establish circulation. Precautionary wash & ream to
bottom @ 13540' with no problems. Circulate & condition
mud/hole with 280 gpm @ 3070 psi. Circulate hole clean with
5.3 x Btms-up. Reciprocate & rotate (100 rpm) while circulating.
Flow check. Well static. Pump slug.
Calculated ECD = 11.01 ppg Actual ECD = 11.44 ppg
ECD prior to Trip = 11.01 ppg
PROD2 POOH from 13540' to 6559' with no problems. Place Circ-Sub
at bottom of whipstock.
Hole in good condition. Average Drag 5-15k.
P/U 172k S/O 60k off bottom with no pump.
PROD2 Drop Circ-Sub opening dart. Break circulation, pump dart on
seat. Shear eire-sub with 2180 psi (Placed @ 175' above bit).
Stage pumps to 200 gpm with 500 psi. P/U on drill string
washing by window & across whipstock face. Pull bit inside
7-5/8" casing to 6364'.
PROD2 Pump Lo-vis sweep. Circulate hole clean from 6189' with 450
gpm @ 2020 psi. Reciprocate & rotate (65 RPM) while
circulating. No drill cuttings observed from Btms-up. Flow
check. Well static. Pump slug.
Continue POOH with drill string to top of BHA.
SAFETY --- Held PJSM with Rig Crew & Anadrill personnel
regarding removing RA Source & UD BHA tools.
Remove RA Source. UD all Anadrill Directional tools & bit.
Clear & clean rig floor.
SAFETY--- Held PJSM with rig crew, Anadrill & Baker
personnel regarding M/U Whipstock retrieving tool (WSRT) &
BHA.
M/U WSRT & BHA which consists of the following: Whipstock
Hook retrieving tool + 1 Jt of 3.5- HWDP + FS + MWD +
Bumper-Sub + Oil Jar + 12 x 4-314- DC + XO + 24 x 4- HWDP
= 1199.63'. Shallow test MWD-OK.
PROD2 TIH with WSRT BHA on 4- DP to 6328'.
PROD2 M/U TDS. Break circulation. Stage pumps to 244 gpm w/1330
psi. Orient WSRT to 15 deg LHS. (P/U Wt 132k S/O Wt 90k).
Slack off on drill string to 6378'. P/U & engage whipstock.
Pull on whipstock with 60k overpull, no release. Jar on
whipstock 3 additional times with 65k over pull & release
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS9ES
From~.JQ.Hqurs ,Tfas~(. Gód~ ,NPT Phase
4/9/2004 19:45 - 23:00 3.25 DRILL P PROD2
23:00 - 00:00 1.00 DRILL P PROD2
4/10/2004 00:00 - 02:30 2.50 DRILL P PROD2
02:30 - 04:00 1.50 DRILL P PROD2
04:00 - 08:00 4.00 DRILL P PROD2
08:00 - 13:45
5.75 DRILL P
13:45 - 17:30
3.75 DRILL P
17:30 - 18:00
0.50 DRILL P
18:00 - 19:00
1.00 DRILL P
19:00 - 21 :30 2.50 DRILL P PROD2
21 :30 - 21 :45 0.25 DRILL P PROD2
21 :45 - 23:30 1.75 DRILL P PROD2
23:30 - 00:00 0.50 DRILL P PROD2
4/11/2004 00:00 - 00:15 0.25 STWHIP P PROD2
00:15 - 01 :30 1.25 STWHIP P PROD2
01 :30 - 03:30
03:30 - 04:00
2.00 STWHIP P
0.50 STWHIP P
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of Operations
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Op~rati on.~SYrTIm~.ry . Report
page:Z2 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From·~ To Hours· Task Code NPT Phase Description of Operél.tion~
4/11/2004 03:30 - 04:00 0.50 STWHIP P PROD2 whipstock. P/U & pull seals out of bottom tie-back receptacle.
Pull whipstock up to 6358' (P/U Wt = 138k). Monitor well 5
minutes. Annulus level fell +1- 20'.
04:00 - 05:00 1.00 STWHIP P PROD2 CBU from 6358' with 200 gpm @ 875 psi. Lost 12 bbl mud at
start of circulating. Lost another 2 bbl mud while circulating
Btms-up. Flow check. Fluid level dropping very very slow.
Pump slug.
05:00 - 07:30 2.50 STWHIP P PROD2 POOH with whipstock assembly #1 to top of BHA.
07:30 - 11 :00 3.50 STWHI P P PROD2 Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock
retrieving tool, L 1 Whipstock & 3.5" DP space-out assembly.
100% recovery of all Whipstock & downhole tools. Clear &
clean rig floor.
11 :00 - 12:00 1.00 CASE P COMP Rig up 4.5" Liner running equipment.
12:00 - 12:15 0.25 CASE P COMP SAFETY--- Held PJSM with rig crew & BOT personnel
regarding running liner & P/U Hook Hanger assembly.
12:15-19:30 7.25 CASE P COMP M/U 4-1/2" Float Shoe (Bent) Jt + 155 Jts of 4-1/2" 12.6#,
L-80, IBT-M slotted liner'. Continue TIH. Tag up on the "Mother
Bore" liner top packer @ 6432'. POOH to 6378' which is
mid-point of window. Apply one round of RHT in string. Slack
off & exit 7-5/8" window into open hole with no other
problems.Continue running 15 additional Jts of 4.5" slotted liner
(170 Jts Slotted) + 1 Jt of solid liner + XO Pup Jt & BOT
Flanged Hook Hanger assembly. Total length = 7138.16'
P/U Wt = 98k SIO Wt = 70k Theoretical Liner Wt in mud
= 77,500 Lbs
19:30 - 20:00 0.50 CASE P COMP Change elevators to fit 4" DP. R/D Hydraulic Casing Tongs &
related equipment.
20:00 - 00:00 4.00 CASE P COMP Continue RIH with 4-1/2" slotted liner on 50 Stds of 4" DP to
11809'.
P/U 148k SIO 55k
4/12/2004 00:00 - 01 :00 1.00 CASE P COMP Continue RIH with 4.5" Slotted Production liner from 11809'.
Tag-up solid @ 13163'. Note: Had 50 Stds of 4" DP + 8 stds 4"
HWDP + 4 stds 4-3/4" DC's + 2 stds & double of 4" DP . Work
string 60' up & down four times. Stacking out all available
weight with string stopping @ 13163' each time.
01 :00 - 02:00 1.00 CASE P COMP M/U TDS. Establish circulation. Stage pumps to 6 bpm @ 1200
psi to help reduce friction between drill string & casing.
Continue working string 30' to 60'. String starting to move down
slowly. Reduce pump rate to 3 bpm with 365 psi. Continue
working string down from 13163' to 13516' (That places the
Hook-Hanger 10' past bottom of 7-5/8" window @ 6384'). Stop
pumps.
P/U 200k S/O 58k
02:00 - 02:30 0.50 CASE P COMP P/U on string & position Hook-Hanger @ 6340'. Rotate 1/4
turn. Run in & go past hook point. Pull back up with
Hook-Hanger to 6340'. Rotate additional 1/4 turn. Run back
down & land Hook-Hanger on the lower lip of 7-5/8" window @
6384'. Reconfirm Hook-Hanger landed by picking up 20' &
relanding same. Did this three times with Hook-Hanger landing
out in same spot every time. Stack out all available string
weight + 10k from TDS down on Hook-Hanger (+1- 33k).
02:30 - 03:30 1.00 CASE P COMP Drop 29/32" ball & pump on seat. Pressure up to 2700 psi to
Printed: 5/312004 8:46:01 AM
)
)
~, : .~" .'...'; .
'.::,6, P""JE,',X"",' P'" ::,L,QRA\"'IQ"~".,:,,.·.,:,,;·', ;,,;
. "''''''.,
:"'···:·'.º.P~:~ftt.iQD.~:,.,·§,gm'rn:ª.rY..'Re.p(J'rt". :
, .. "~;':': i~' .
, ..n.¡':.,:,:";',;".;...
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
.~ :'~. :", ,
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date 1..FrörYl~ To HoUrs Task Cöde NPT
Description of Operations
COMP release HWH Running tool. P/U Drill string 10' (P/U 135k) &
verify HWH Running tool released. Lost 60k string wt. Set back
down & tag Hook-Hanger with 25k-OK. P/U on string & place
HWH Running tool @ 6335' (32' above Hook Hanger @ 6367').
R/U Side Entry Pump-in sub into the 4" DP. Pressure up to
4750 psi & blow ball seat. RID pump-in sub. M/U TDS.
CBU from 6335' with 6 bpm @ 960 psi. Flow check. Well static.
Pump slug. Blow down TDS.
POOH with 4" DP from 6335' to surface. UD Baker HWH
Running tool. Clear & clean rig floor.
SAFETy---- Held PJSM with Rig Crew & Baker Service Rep
regarding P/U LEM & ZXP Packer assembly.
M/U LEM/ZXP assembly on 4" DP.
TIH with LEM/ZXP assembly on 60 Std of 4" DP + 8 Std of 4"
HWDP to 6316'.
M/U TDS. RIH slowly to 6330'. Establish up & down string
weights, P/U 125k S/O 100k. Slack off on string to set the
LEM into the hook hanger collet @ 6362' with the 4.75" OD
Seals stung into the Lower (OBd lateral) Seal Bore Extension
@ 6475'. Land LEM with 20k. P/U 10k to verify set, then slack
off 10k on ZXP packer & park pipe. Drop the 29/32" setting
ball and pump onto seat @ 2 bpm wI 210 psi. Pressure up to
2500 psi, wait 2 minutes, then increased pressure to 2900 to
set the ZXP packer. At this point in time while pressuring up to
release the Baker Type "HRD" Packer Setting tool which was
pinned to shear @ 3600 psi, the ball seat sheared prematurely
at 3350 psi.
COMP Pressure test ZXP Packer x 7-5/8" casing to 1500 psi for 15
minutes. Lost 75 psi.
DFAL COMP Attempt to release from ZXP Packer. Work string up to 135k
(10k Over-pull) & down to 50k with no success. Apply 2.5 Left
Hand turns into string. Work torque down & attempt to release
Packer Setting Tool. Tool would not release. Pull up to 150klbs
(-25 klbs over PU wt). Still not indicating that Setting tool is
released from L TP assembly.
NOTE: The Baker Type "HRD" Setting Tools primary releasing
mechanism is hydraulic with an emergency mechanical
back-up Left-hand release.
DFAL COMP 9ES Rig Team discussed downhole tool failure problem with
the BP ODE & Baker Engineers. After evaluating the options it
was decided to drop a 1.75" OD Steel Ball down the string, let
gravitate on seat. Then pressure up to 4200 psi on the drill pipe
to ensure that the ZXP Packer & Hold Down slips are fully set
& also to shear the hydraulic release mechanism on the Packer
Setting tool.
DFAL COMP Waiting on Baker to deliver a 1.75" aD Steel Ball to the rig.
DFAL COMP Break off TDS from DP. Drop the 1.75" OD Steel Ball down 4"
DP. M/U TDS. Let ball gravitate on seat.
DFAL COMP Pressure up on drill string to 4200 psi. Hold for 10 minutes.
Release pressure. P/U on string. Packer Setting tool free. P/U
12' to & position the rotating Dog Sub on HRD Setting tool
above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack
off on string & slam 65klbs down weight on ZXP Packer.
4/12/2004
1.00 CASE P
02:30 - 03:30
03:30 - 04:30 1.00 CASE P COMP
04:30 - 07:30 3.00 CASE P COMP
07:30 - 08:30 1.00 CASE P COMP
08:30 - 09:00 0.50 CASE P COMP
09:00 - 15:30 6.50 CASE P COMP
15:30 - 17:00 1.50 CASE P COMP
17:00 - 17:30
0.50 CASE P
17:30 - 18:00
0.50 CASE N
18:00 - 20:30
2.50 CASE N
20:30 - 21 :30
21 :30 - 23:00
1.00 CASE N
1.50 CASE N
23:00 - 23:30
0.50 CASE N
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Operª~lons ~Uml11ªrYf1~port
Page 24 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date·· From.;. To Hours Task COdeNPT .. Phase .... ... D~sçriptionof Operations
4/12/2004 23:00 - 23:30 0.50 CASE N DFAL COMP Repeated this process 5 additional times.
NOTE: Top of "L 1" ZXP Packer @ 6319' MDRKB.
23:30 - 00:00 0.50 CASE P COMP Break out TDS. Pull one std of 4" DP & rack in derrick. Blow
down TDS & surface equipment.
4/13/2004 00:00 - 01 :30 1.50 CASE P COMP Slip & cut drill line. Reset & check C-O-M. Check drawworks
brake system. Service TDS.
01 :30 - 04:30 3.00 CASE P COMP POH (Wet) with 4" DP work string. UD Baker "HRD" Setting
Tool.
NOTE: The Dog sub was sheared on setting tool but the shear
screws on the emergency mechanical release mechanism did
not shear.
04:30 - 05:00 0.50 CASE P COMP Clean rig floor of excess MOBM that was generated from Wet
Trip.
05:00 - 09:30 4.50 BOPSUPP WEXIT Drain stack & pull wear ring. Hold PJSM. Test BOPE to 250
psi/3500 psi. Lower pneumatic well control valve would not test.
Witness of test waived by Jeff Jones - AOGCC.
09:30 - 10:30 1.00 BOPSUR P WEXIT Blow down lines. Install wear ring.
10:30 - 12:30 2.00 BOPSUP P WEXIT PJSM. Change out lower well control valve, pressure test to
250 I 3500 psi.
12:30 - 13:00 0.50 STWHIP P WEXIT Bring Baker whipstock tools to floor.
13:00 - 13:30 0.50 STWHIP P WEXIT PJSM with all personnel on handling and running Baker
whipstock.
13:30 - 15:30 2.00 STWHIP P WEXIT M/U whipstock BHA wI 3 1/2" spaceout and dummy seal
assembly hanging below, orient MWD wI whipstock
15:30 - 16:30 1.00 STWHIP P WEXIT RIH wI collars and HWDP, shallow test MWD
16:30 - 20:00 3.50 STWHIP P WEXIT RIH wI whipstock on 4" drillpipe, fill pipe at 4000',6250', 135K
UP, 95K ON, no pump
20:00 - 21 :00 1.00 STWHIP P WEXIT Orient whipstock 7 degrees left of high side at 50' above setting
depth, slack off and stab dummy seal into tieback sleeve on
L-1 at 6319', set down 20K to set whipstock anchor, continue to
set down 35K and shear mills off whipstock, test casing to
1500 psi, bled down 70 psi in 7 minutes,
21 :00 - 00:00 3.00 STWHIP P WEXIT Record SPR's. Start intial cut to place Top of Window at 6229'
DPM. 130K UP, 93K DN, 105K RT, 3K WOB, 118 SPM,
290 GPM, 1840 PSI, 100 RPM, 6K TO, Mill window to 6237'
MN Depth.
4/14/2004 00:00 - 00:30 0.50 STWHIP P WEXIT Mill window from 6237' to 6241', drill new hole from 6241' to
6254'
RT WT 105, GPM 290, SPP 1890 psi, RPM 100, TQ 6000
00:30 - 01 :30 1.00 STWHIP P WEXIT Circulate high vis sweep S/S, 295 GPM, 1775 PSI, working
string mills
01 :30 - 02:00 0.50 STWHIP P WEXIT Perform FIT test to EMW 12.0 ppg, applied surface pressure
650 psi, mud weight 9.2 ppg MOBM
02:00 - 04:00 2.00 STWHIP P WEXIT Monitor well, pump dry job, POH
04:00 - 05:30 1.50 STWHIP P WEXIT Stand back HWDP, Lay down DC, Lay down milling BHA,
string mill in guage at 6.75"
05:30 - 06:00 0.50 STWHIP P WEXIT Clean and clear rig floor
06:00 - 06:30 0.50 STWHIP P WEXIT M/U ported sub, jet BOP stack
Recovered a total of 130 Ibs of metal from milling and jetting
stack
06:30 - 08:30 2.00 DRILL P WEXIT PJSM wI Anadrill DO I MWD and all rig crew, picking up of
BHA # 11 and installing RA source,
Printed: 5/3/2004 8:46:01 AM
.,~<, ,.,~.., :'."I~;.:,,, ,: ".'. :/:< "
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
)
'.' SHE22<R,LQ8A,-tON.·
··O.perations ·Summaryr:iepotf·'
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
·g~g¢·?êºtª4·
'" ,.', .', "".",'.
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
4/14/2004
08:30 - 11 :30
11 :30 - 12:00
12:00 - 00:00
4/15/2004
00:00 - 12:00
12:00 - 17:00
17:00 - 18:00
18:00 - 00:00
3.00 DRILL P
0.50 DRILL P
12.00 DRILL P
WEXIT
WEXIT
PROD3
12.00 DRILL P
PROD3
5.00 DRI LL P
PROD3
1.00 DRILL P
PROD3
6.00 DRILL P
PROD3
4/16/2004 00:00 - 01 :30 1.50 DRILL P PROD3
01 :30 - 04:30 3.00 DRILL P PROD3
04:30 - 05:00 0.50 DRILL P PROD3
05:00 - 06:00 1.00 DRILL P PROD3
06:00 - 10:00 4.00 DRILL N AREP PROD3
10:00 - 13:30 3.50 DAILL P PAOD3
;".':.:,:,':., ':"""" , :",; ". ...'",:.,:',.":,:, . ::",:,.,: :.:'''':'..''''
',' ,'.. . ,...., ". ,.., ,.., ". ".. ,..
· ······[)escription·of0peratie>r1s
RIH wI stands to 1172', test MWD, RIH to 6208'
Circulate to obtain SPR I ECD baseline of 10.56 ppg
S/O through TOW at 6229' wI no pump, continue to drill from
6254' to 7607'
123K UP, 80K DN, 99K AT WT, 114 SPM, 280 GPM, 2700
PSI ON
2330 PSI OFF, 65 APM, 4.5 - 6.5K TO ON, 4.3 TO OFF, 3K
-12K WOB
Calculated ECD 10.29 ppg, Actual ECD 10.72 ppg, Backream
each stand,
Survey every 30', slide as per DD
AST 1.88 hrs, ART 2.41 hrs
128K UP, 86K DN, wI no pumps
Directional Drill from 7607' to 9249',
127K UP, 86K DN, 104K AT, 114 SPM, 280 GPM, 2823
PSI ON,
2607 PSI OFF, 65 APM, 4.5 - 7K TO ON, 4.5K TO OFF, 5-
10WOB
Calculated ECD 10.38 ppg, Actual ECD 10.92 ppg
Backream each stand, Survey every 30', slide as per DD.
Directional Drill from 9249' to 10,027'
140K UP, 76K DN, 101K AT, 114 SPM, 280 GPM, 3140
PSI ON
2780 PSI OFF, 65 APM, 8 - 11 TO ON, 7.1K TO OFF,S - 15
WOB
Calculated ECD 10.64 ppg, Actual ECD 11.67 ppg
Backream each stand, Survey every 30', AST 1 hr, ART
2.36 hrs
Circulate bottoms up to lower ECD from 11.67 ppg to 11.23
ppg
Add 50 bbls L VT -200
Directional Drill from 10,027' to 10,679'
142K UP, 72K DN, 101K RT, 114 SPM, 280 GPM, 3140
PSI ON
2860 PSI OFF, 65 RPM, 7 - 8.5K TO ON, 7.6K TO OFF,5-
10WOB
Calculated ECD 10.75 ppg, Actual ECD 11.47 ppg
Backream each stand, Survey every 30', slide as per DD
AST 1.24 hrs, ART 2.69 hrs
Circulate bottoms up twice, Calculated ECD 10.77 ppg, Actual
ECD 11.48 ppg, Circulate at 280 GPM, 2850 PSI, 80 RPM,
ECD after circulating 11.19 ppg
Monitor well, POH 5 stds, pump dry job, intermittent drag 5 -
20K, POH to window, no problems coming thru window, POH
to 6208'
Rig service, service top drive and crown
Slip I cut 52' of drilling line
During TD service, found capscrews locating Top Drive brake
disc in place on traction motor shaft had sheared off so TD
brake is not functioning. Inspect & repair same.
Orient MWD high sde, slide past whipstock wI no pump, fill
pipe and test MWD at 7000', AIH to 9000', fill pipe, no pump,
continue to 10,285', start to wash down, 250 gpm, 50 rpm,
Printed: 51312004 8:46:01 AM
BP EXPLORATION
Operations Summ.ªry Report
Page 26 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Qate From.:. To Hours. Task . Code ·NPT Phase . Description of Operatipns
4/16/2004 10:00 - 13:30 3.50 DRILL P PROD3 2580 psi, 12.0 ECD
13:30 - 14:30 1.00 DRILL P PROD3 At 10,285' circulate bottoms up, drop ECD from 12 to 11.20
ppg, 250 gpm, 2580 psi, 50 rpm
14:30 - 15:00 0.50 DRILL P PROD3 RIH from 10,285' to 10,585', wash from 10,585' to 10,679'
15:00 - 00:00 9.00 DRILL P PROD3 Dir Drill from 10,679' to 11,436', UP WT 148K, DN WT 56K,
RT WT 102K
290 GPM, 3220 PSI ON, 2925 PSI OFF, 8 - 12 TQ ON, 8.6
TQ OFF,
Cal ECD 10.66 ppg, Act ECD 11.38 ppg, 65 RPM,
Sackream each stand, driil rate up stroke, reduce rate to 250
gpm down stroke
Slide as per DD, AST 1.78 hrs, ART 1.24 hrs
4/17/2004 00:00 - 02:00 2.00 DRILL P PROD3 Dir Drill from 11,436' to 11,625'
154K UP, 58K DN, 102 RT WT, 118 SPM, 2910 PSI OFF
3290 PSI ON, Cal ECD 10.70, Act ECD 11.31
Sackream each stand at drilling rate up, 250 gpm down stroke
02:00 - 03:30 1.50 DRILL N WAIT PROD3 Circulate while wellsite Geologist consults with Anchorage
Geology team.
03:30 - 11 :30 8.00 DRILL P PROD3 Dir drill from 11,625' to 12,359'
151K UP, 54K DN, 103K RT WT, 118 SPM, 3000 PSI OFF
3180 PSI ON, 8 - 10K TQ ON, 8.4K TO OFF,S - 10K WOS
Cal ECD 10.75, Act ECD 11.48, AST 1.8, ART 2.52
Sackream each stand at drilling rate up, 250 gpm down stroke
11 :30 - 12:30 1.00 DRILL P PROD3 Circulate to drop ECD from 11.75 to 10.71 ppg
280 GPM, 2936 PSI, 65 RPM
12:30 - 23:00 10.50 DRILL P PROD3 Dir Drill from 12,359' to 13,106'
157K UP, 55K DN, 103K RT WT, 118 SPM, 3014 PSI OFF
3355 PSI ON, 9 - 11 K TQ ON, 9K TO OFF,S - 10K WOS
Cal ECD 10.41, Act ECD 10.80, AST 2.1, ART 1.75
Sackream each stand at drilling rate up, 250 gpm down stroke
23:00 - 00:00 1.00 DRILL P PROD3 Circulate to drop ECD from 10.80 to 10.41 ppg
290 GPM, 3350 PSI, 65 RPM
4/18/2004 00:00 - 00:30 0.50 DRILL P PROD3 Dir Drill, slide from 13,106' to 13,114'
152K UP, 58K DN, 100K RT WT, 114 SPM, 280 GPM
3350 PSI ON, 3010 PSI OFF, 1 - 5K was, 10K TO ON,
9K TO OFF, Cal ECD 10.80, Act ECD 11.25
00:30 - 01 :00 0.50 DRILL N DFAL PROD3 Circulate and test mud motor, motor on bottom causes
pressure spike.
Unable to operate motor within limits (acts as if pumping thru a
stalled motor). Geologist consults Anchorage and they are
prepared to call this TD for lateral L2.
01 :00 - 03:30 2.50 DRILL N DFAL PROD3 Circulate to drop ECD from 11.25 to 11.10 actual, calculated
10.80 ppg for wiper trip.
03:30 - 08:00 4.50 DRILL N DFAL PROD3 Wiper trip to window, flow check, pull 5 stands, flow check,
pump slug, Minor drag at 12710' & 11120' (15 klbs over normal
drag). Drop back down thru same and come back thru - OK.
Continue up inside window without further tight spots or
problems.
08:00 - 08:30 0.50 DRILL P PROD3 Service top drive.
08:30 - 09:30 1.00 DRILL N DFAL PROD3 Attempt to break circ to orient for exiting window. Circ pressure
4000 psi @ 200 gpm. Discuss with Anch DE and agree to POH
for new motor. Drop circ sub ball and open same. Circ casing
clean at 450 gpm @ 1900 psi. Monitor well & pump dry job.
Printed: 5/312004 8:46:01 AM
)
')
J3.RSXPC1QHAJION··.i
.... ·:'L:·!;PQ~rªtJ.ºn:S..·..·.$.~:··ITI.m,ªry·,R~·p,Qrt
"'<'.,.,~;.f.-¡'
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
D,ate From - To Hours . Task Code NPT Phase Description of Operations
4/18/2004 09:30 - 12:30 3.00 DRILL N DFAL PROD3 POH for motor changeout. Will go back in with new 1.15 deg
AIM motor and no Neutron/Density tool to drill remaining 400'
of hole as agreed by Anch Geology and ODE.
12:30 - 14:00 1.50 DRILL N DFAL PROD3 PJSM, w/ MWD, DD, rig crew on handling of source, handling
BHA, change out motor, bearing pack gone
14:00 - 14:30 0.50 DRILL N DFAL PROD3 Clear and clean rig floor
14:30 - 15:00 0.50 DRILL N DFAL PROD3 Down load MWD and LWD, up load VPWD
15:00 - 17:00 2.00 DRILL N DFAL PROD3 Make up bit # 9, run BHA # 12
17:00 - 22:30 5.50 DRILL N DFAL PROD3 RIH to 1500', shallow test MWD, RIH to 6229', orient 7 left of
highside, slide through window, RIH to 10,000', fill drillstring,
RIH to 10,935', taking weight approx 25k, to 110988' and again
at 11680'. Wash from 13,010' to bottom. Estimate losing
approx 75 bbl mud to formation during trip.
22:30 - 00:00 1.50 DRILL N DFAL PROD3 Circulate to lower initial ECD on bottom of 12.14 to 10.81 ppg
213 GPM, 2058 PSI
4/19/2004 00:00 - 04:30 4.50 DRILL P PROD3 Directional drill from 13,114' to 13,490', TD for lateral # 3
157KUP, 56KDN, 99KRT, 10-15KWOB, 118SPM, 290
GPM
2920 PSI OFF, 3150 PSI ON, 10K TO ON, 9K TO OFF
Circulate throughout to keep calculated ECD at 10.81 ppg,
actual 11.41 ppg.
Mud seepage loss to well at 1-2 bph.
04:30 - 08:00 3.50 DRILL P PROD3 Circulate to lower actual ECD from 11.41 ppg to 11.08 ppg for
trip out.
Calculated ECD 10.88 ppg plus 0.2 = 11.08 ppg. Current ECD
= 11.01 ppg.
08:00 - 16:00 8.00 DRILL P PROD3 Moniter well, pump dry job, POH, intermitten overpull of 5 -
15K, record up / dn WT every 5 stands in open hole, every 10
stands in casing
16:00 - 17:00 1.00 DRILL P PROD3 Lay down directional drilling BHA # 12
17:00 - 17:30 0.50 DRILL P PROD3 Clean and clear rig floor
17:30 - 18:00 0.50 RUNCOrvP COMP Pick up / make up whipstock retrieving BHA
18:00 - 19:30 1.50 RUNCOrvP COMP Pick up / make up 24 x 4 3/4· DCs from pipe shed 1 x 1
19:30 - 21 :00 1.50 RUNCOrvP COMP Trip in to 6167' w/ drillpipe
21 :00 - 22:30 1.50 RUNCOrvP COMP Rig service, service top drive / crown
22:30 - 23:00 0.50 RUNCOrvP COMP Orient 7 left high side, slide hook down to 6235', work down,
latched in on second attempt, pick up to 175K and set jars off,
pick up to 200K and set off jars, pick up to 21 OK, whipstock
free, trip to 6200', UP WT 140K, DN WT 95K
23:00 - 23:30 0.50 RUNCOrvP COMP Circulate bottoms up, 275 GPM, 1750 PSI, losses of 17 bbls
downhole in first 10 minutes of circulating, monitor wellbore,
pump dry job
23:30 - 00:00 0.50 RUNCOrvP COMP Trip out with whipstock and assembly, UP WT 150K
4/20/2004 00:00 - 04:00 4.00 RUNCOrvP COMP Trip out slowly with whipstock
04:00 - 05:30 1.50 RUNCOrvP COMP Lay down whipstock retrieving BHA, lay down whipstock and
tail space out tubulars.
05:30 - 06:30 1.00 RUNCOrvP CaMP Clean and clear rig floor
06:30 - 07:30 1.00 RUNCOrvP COMP Rig up to run 4 1/2" L-80 slotted liner
07:30 - 16:00 8.50 RUNCOrvP COMP PJSM, RIH w/ slotted liner, make up to mark, 2300 ft Ibs
torque, use BOL 2000 NM dope, run at 90 seconds per joint in
casing, RIH to middle of window at 6235', RIH with joint # 152,
10' down taking wt at 6330', POH to middle of window, turn
pipe 1/4 turn work tq down, RIH to 6330' taking wt, POH to
Printed: 51312004 8:46:01 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Page 28 of 34
BP EXPLORAJION
Operati9nSSUI1'llTlary Repor~
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
4/20/2004
07:30 - 16:00
From - To Hours Task Code NPT Phase
COMP
Date
16:00 - 21 :30
21 :30 - 23:00
23:00 - 00:00
8.50 RUNCOIvP
5.50 RUNCOIvP
COMP
1.50 RUNCOIvP
COMP
1.00 RUNCOtv1P
COMP
4/21/2004 00:00 - 00:30 0.50 RUNCOrvP COMP
00:30 - 05:00 4.50 RUNCOIvP COMP
05:00 - 06:00 1.00 RUNCOIvP COMP
06:00- 06:30 0.50 RUNCOIvP COMP
06:30 - 07:30 1.00 RUNCOIvP COMP
07:30 - 11 :30 4.00 RUNCOIvP COMP
11 :30 - 12:00 0.50 RUNCOIvP COMP
12:00 - 13:30 1.50 RUNCOIvP COMP
13:30 - 15:00 1.50 RUNCOIvP COMP
15:00 - 17:00 2.00 RUNCOIvP COMP
17:00 - 18:00 1.00 RUNCOIvP COMP
18:00 - 19:00
19:00 - 19:30
19:30 - 20:30
1.00 RUNCOIvP
COMP
0.50 RUNCOIvP
COMP
1.00 RUNCOIvP
COMP
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of Operations
6235', turn 1/4 turn, bent jt through window on 4 th attempt,
liner in open hole, run speed 60' per minute, make up hook
hanger, 100K UP WT, 70K DN WT, ran total of 171 jts of 4
1/2" liner
Change out casing equipment, rig to run stands from derrick,
RIH to 13,458', 190K UP WT, 55K DN WT
RIH to 10' past hook hanger at 13,458', turn pipe 1/4 turn, work
tq in pipe, work down past window, turn pipe 1/4 turn, work tq
down, work past window, failed at 2 more attempts, turn pipe
1/8 turn, work tq down, work hook past window, continue
turning 1/8 turn and working past pipe down window. 200K UP
WT, 50K DN WT
Land Hook hanger, drop 29/32" ball, pump first 30 bbls at 4
bpm, 636 psi, reduce to 2 bpm, 175 psi for 15 bbls, pump 1 bbl
to seat, pressure to 3000 psi, release HR tool, free pick up wt
140K, lost 60K, pressure up and shear ball seat at 4400 psi
Circulate bottoms up at 375 gpm, 2290 psi, with pumps oft tag
up, top of hook hanger at 6224', 11.5' up on stand 51, monitor
wellbore, pump dry job
Trip out, lay down 12 x 4 3/4" DCs,
Lay down Baker liner running tools
Clean and clear rig floor
Drain BOP stack, pull wear bushing, install test plug
PJSM, PT BOP and all related equipment to 250 psi low,
3500 psi high
Perform D4 accumulator function test
Witnessing waived by Lou Gramaldi AOGCC
Pull test plug, install wear bushing
Rig service, service top drive
Rig up, pick up, make up LEM # 2 assembly, make up to mark
3200 ft Ibs, use SOL 2000 dope, make up seal bore assembly
to 4600 ft Ibs
RIH slow on DCs, mud overflowing pick up subs, make up top
drive to HWDP
RIH through hook hanger at 6224', slide through no problems
135K UP WT, 95K DN WT
Appear to have tagged up 13' higher, (collar from LEM
hanging up in hook hanger?) gives appearance of positive
orientation and collet latch in hook hanger, two attempts,
third attempt turn LEM 1/2 turn, work down to proper depth of
6345'
Drop ball, pump 4 bpm at 713 psi for 30 bbls, pump 2 bpm at
236 psi for 11 bbls, pump 1 bpm at 100 psi until ball seated,
pressure up to 4000 psi to set ZXP packer, pick up to 135K
UP WT, pick up 10' to release rotating dogs, rotate setting
dogs at 20 rpm, to verify packer set, pressure test annulus to
1500 psi for 10 minutes, charted, top of ZXP packer at
6173.40 I
PJSM with BAKER rep and rig crew, pressure up to 3000 psi
with rig pump, pressure up to 5200 psi with test pump, blow
ball seat
Circulate bottoms up at 114 spm, 1217 psi, monitor wellbore,
pump dry job
Printed: 5/312004 8:46:01 AM
)
)
68 EXPÞOffi~II()(\J
:... ·.º¡PE!tétliº.O'ª',$µmQ1~rYReport
'.~,::{,. :
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
.','"..'.
'Task GodèNPT Phase
4/21/2004 20:30 - 00:00 3.50 RUNCOMN DFAL COMP
4/22/2004 00:00 - 03:00 3.00 RUNCOW COMP
03:00 - 03:30 0.50 RUNCOW COMP
03:30 - 04:30 1.00 STWHIP N DFAL WEXIT
04:30 - 13:00 8.50 STWHIP N DFAL WEXIT
13:00 - 14:30 1.50 STWHIP N DFAL WEXIT
14:30 - 15:00 0.50 STWHIP P WEXIT
15:00 - 15:30 0.50 STWHIP P WEXIT
15:30 - 17:00 1.50 WHIP P WEXIT
17:00 -18:00 1.00 WHIP P WEXIT
18:00 - 20:30 2.50 WHIP P WEXIT
20:30 - 21 :00 0.50 WHIP P WEXIT
21 :00 - 21 :30 0.50 WHIP P WEXIT
21 :30·00:00 2.50 STWHIP P WEXIT
4/23/2004
00:00 - 02:00
2.00 STWHIP P
WEXIT
02:00 - 02:30 0.50 STWHIP P WEXIT
02:30 - 03:00 0.50 STWHIP P WEXIT
03:00 - 05:00 2.00 STWHIP P WEXIT
05:00 - 07:00 2.00 STWHIP P WEXIT
07:00 - 07:30 0.50 STWHIP P WEXIT
07:30 - 08:00 0.50 STWHIP P WEXIT
08:00 - 09:00 1.00 DRILL P WEXIT
09:00 - 09:30 0.50 DRILL P WEXIT
09:30 - 10:00 0.50 DRILL P WEXIT
10:00 - 12:00 2.00 DRILL P WEXIT
12:00 - 13:00 1.00 DRILL P WEXIT
13:00 - 14:00 1.00 DRILL P WEXIT
14:00 - 14:30 0.50 DRILL P WEXIT
14:30 - 00:00 9.50 DRILL P PROD4
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
. ." .' "",, :. ' ,', .:",: ..~
. , , , . . . .
Description of Operåtions
POH, lay down 192 jts DP to pipe shed, 133K UP WT, 95K
DNWT
Trip out laying down drill pipe and HWDP for hard banding
wear.
Lay down LEM running tools
Trip in 10 stands drillpipe from derrick, lay down same for
hardbanding wear
Pick up, make up, trip in drillpipe 1 x 1 to replace layed out
drillpipe
Trip out racking back 42 stands of drillpipe
Clear and clean rig floor
Rig service, service top drive and crown
PJSM, Baker rep and rig crew, p/u, m/u, seal and whipstock
assembly, orient same
RIH with DCs and HWDP, 90 seconds per stand
RIH with drillpipe at 90 seconds per stand
Orient whipstock at 14 degrees left of high side, set anchor with
15K down at 6185', pick up to 145K, slack off to 35K, shear
starting mill off whipstock at 42K
Pressure test casing to 1500 psi for 5 minutes, circulate and
record SPRs
Begin milling at 6025', TOW, to 6031'
7K WOB, 135K UP WT, 90K DN WT, 107K RT WT, 290
GPM, 1798 PSI, 100 RPM, 7 - 8 TO
Adding 200 bbls of new 9.2 ppg MOBM to active system while
milling
Mill window from 6031 to 6050', TOW 6025', BOW 6037',
open hole from 6037' to 6050'
7 -10K WOB, 135K UP WT, 90K DN WT, 107K RT WT, 290
GPM, 1798 PSI, 100 RPM, 8 - 9 TO
Circulate 50 bbl high vis pill, 60% increase in cuttings when pill
at shaker
FIT test to 12 ppg mud, applied surface pressure 650 psi,
mud weight 9.3 ppg, TVD 4440', pressure bled down from 650
psi to 600 psi in 7 minutes, then held steady
Monitor wellbore, pump dry job, trip out with mill BHA
Stand back HWDP, lay down DCs, lay down milling BHA,
mills in guage
Clean and clear rig floor
Flush stack with ported sub
PJSM, PU, MU, bit # 4, BHA # 13
PJSM, load source in directional BHA
RIH with BHA, shallow test MWD at 1500'
RI H to 5932', fill pipe
Rig service, slip and cut drilling line
Rig service, service top drive, crown
Break circulation, orient to 10 degree left of high side, obtain
baseline ECD mud weight 9.2 ppg, ECD 10.03 ppg
Directional drill from 6050' to 6773'
116KUPWT, 82KDNWT, 105KRTWT, SPM113, GPM
280, RPM 40
TO ON 5.3, TQ OFF 3.5, Cal ECD 10.13, Act ECD 10.46
Printed: 51312004 8:46:01 AM
BP·.EXPLORATION
Operati opsSu rn l11~ryReport
Page 30 of. 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From-To Hours Task Code NPT Phase Description of Operations
4/24/2004 00:00 - 03:00 3.00 DRILL P PROD4 Directional drill from 6773' to 7147'
114 SPM, 290 GPM, 40 RPM, 9 - 11 TO ON, 8.7 TO OFF,
03:00 - 04:00 1.00 DRILL N DFAL PROD4 Problems with MWD survey accuracy, a large difference from
surveys and corrected surveys, roll test MWD, talk with
Anadrill directional engineer about survey accuracy, decision to
drill ahead
04:00 - 12:00 8.00 DRILL P PROD4 Directional drill from 7147' to 7981'
113 SPM, 276 GPM, 2500 PSi, 40 RPM, 10 - 11 TO ON,
8.9 TO OFF,
Cal ECD 10.26, Act ECD 10.95, AST 1.24, A TR 3.02
12:00 - 17:00 5.00 DRILL P PROD4 Directional drill from 7981' to 8630;
113 SPM, 273 GPM, 2540 PSI, 80 RPM, 6 TO ON, 5.5 TO
OFF,
Cal ECD 10.42, Act ECD 11.17
17:00 - 18:30 1.50 DRILL P PROD4 Circulate to lower ECD from 0.8 over to 0.6 over calculated
ECD of 10.42
18:30 - 00:00 5.50 DRILL P PROD4 Directional drill from 8630' to 8848'
113 SPM, 273 GPM, 2510 PSI, 40 RPM, 6TOON,5TO
OFF,
Cal ECD 10.42, Act ECD 10.52
126K UP, 82K DN, 104K RT WT
AST 2.72, ART 0.16
4/25/2004 00:00 - 02:30 2.50 DRILL P PROD4 Directional drill from 8848' to 8978'
127K UP, 83K DN, 104K RT WT, 6 TO ON, 5 TO OFF
113 SPM, 273 GPM, 5 - 20 WOS, 2520 PSI ON, 2430 PSI
OFF,
AST 2.9, ART 1.1
02:30 - 03:00 0.50 DRILL P PROD4 At 8978' wellbore crossed fault, consult with Anchorage
geology team, decision to steer well bore up to locate shales for
drilling TVD
03:00 - 05:30 2.50 DRILL C PROD4 Directional drill from 8978' to 9378', Steer well bore to 99
degrees high side, rotate out, drill ahead as per geology
instructions,
05:30 - 13:30 8.00 DRILL C PROD4 Circulate wellbore, consult with Anchorage geology team: Did
not intend to cross 50' throw fault in this location in the polygon.
Had to discuss polygon development options prior to
proceeding.
13:30 - 14:30 1.00 DRILL C PROD4 Trip out from 9378' to 8715', 150K UP, 73K DN
14:30 - 15:00 0.50 DRILL C PROD4 Start trenching from 8715' to 8733', 160 degree left, 113SPM,
280 GPM, 2440 PSI
15:00 - 00:00 9.00 DRILL C PROD4 Directional drill from 8733' to 9191', 113 SPM, 280 GPM,
2620 PSI ON, 2560 PSI OFF, 40 RPM
144K UP, 69K DN, 101 RT, Cal ECD 10.66, Act ECD 11.15,
AST 4.17, ART 0.13
4/26/2004 00:00 - 02:30 2.50 DRILL C PROD4 Directional drill from 9191' to 9378' MD as per new geological
prognosis.
02:30 - 04:00 1.50 DRILL P PROD4 Directional drill from 9378' to 9486'
2720 PSI ON, 2540 PSI OFF, 6.7 TO ON, 6.1 TO OFF, 5-
8K WOS
142K UP, 82K DN, 100K RT, Cal ECD 10.83, Act ECD
11.22
04:00 - 05:00 1.00 DRILL P PROD4 Circulate wellbore, consult with Anchorage geology team
05:00 - 09:00 4.00 DRILL P PROD4 Directional drill from 9486' to 9860' TD for L3
Printed: 5/3/2004 8:46:01 AM
)
)
~.¡
'.'.:..,..,...,:[..,:..'.....,.. .,...":;..:~.P',.,.,f2XP8~~:~~I.p,~;¡...,......:..'",, .,.:.!...'..,:,.:....'.',.,
Oþératlóns,'Sl,Irn,1118ryReport
Circulate at 280 gpm, with 100 RPM for max well bore
cleaning, calculated ECD 10.87, drop actual ECD to 11.17, 0.3
ppg over calculated
Wiper trip, monitor wellbore, pull 5 stands, pump dry job, 143k
UP, 84K DN, trip to window, pull 15K over at 8940, 8845,
8225,8585, wipe clean, ok, pull 20K over at 8758,8565, pump
125 GPM with 40 RPM, wipe clean, ok
Rig service, service top drive
Orient high side, slide through window with no pump, trip in to
8680', orient 145 left, slide through open hole side track, trip in
to 9845', pick up single and wash to bottom at 9860'
Circulate to lower ECD and clean wellbore, drop actual ecd
from 11.87 to 11.05, 0.2 over calculated of 10.89 ppg
113 SPM, 280 GPM, 2610 PSI, 100 RPM,
Trip out, monitor wellbore, pull 5 stands, 143K UP, 84K DN,
pump dry job, trip out
Trip out of well bore to place circulating sub at window,
well bore in good condition, no wiping during trip
Orient to 14 deg LHS. Drop Circ-Sub opening ball, Pump at
450 GPM, 2320 PSI, wash whipstock twice, 50 % increase in
cuttings at shakers during first bottoms up, 4 bottoms up to
clean casing,
Flow check. Well static. Pump slug.
Continue POOH to top of BHA.
SAFETY --- Held PJSM with rig crew & Anadrill personnel
regarding removing the RA Source & UD BHA.
Remove RA Source. UD all Anadrill Directional tools & bit.
Clear & clean rig floor.
SAFETY m Held PJSM with rig crew, Anadrill & Baker
personnel regarding M/U Whipstock retrieving tool (WSRT) &
BHA.
M/U WSRT & BHA which consists of the following: Whipstock
Hook retrieving tool + 1 Jt of 3.5" HWDP + FS + MWD +
Bumper-Sub + Oil Jar + 12 x 4-3/4" DC + XO + 24 x 4" HWDP
= 1199.63'. Shallow test MWD-OK.
COMP TIH with WSRT BHA on 4" DP to 5975'.
COMP M/U TDS. Break circulation. Stage pumps to 280 gpm w/1675
psi. Orient WSRT to 14 deg LHS. (P/U Wt 130k S/O Wt 94k).
Slack off on drill string to 6030'. P/U & engage whipstock.
Pull on whipstock with 60k overpull, no release. Jar on
whipstock 1 time with 95k over pull & release whipstock. P/U &
pull seals out of L2 tie-back receptacle. Pull whipstock up to
6000' (P/U Wt = 136k). Monitor well 5 minutes. Annulus level
fell +/- 30'. Fill hole with 8 bbl of mud.
COMP POOH 5 stds. Pump slug. Continue POOH with whipstock
assembly #3 to top of BHA.
COMP Stand back 4" HWDP & 4-314" DC. UD MWD, Whipstock
retrieving tool, L3 Whipstock & 3.5· DP space-out assembly.
100% recovery of all Whipstock & downhole tools. Clear &
clean rig floor.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
, Date From - To Hours Task Code NPT. Phas.e
4/26/2004 05:00 - 09:00 4.00 DRILL P PROD4
09:00 - 12:30 3.50 DRILL P PROD4
12:30 - 17:00 4.50 DRILL P PROD4
17:00 - 17:30 0.50 DRILL P PROD4
17:30 - 20:30 3.00 DRILL P PROD4
20:30 - 22:30 2.00 DRILL P PROD4
22:30 - 00:00 1.50 DRILL P PROD4
4/27/2004 00:00 - 02:00 2.00 DRILL P PROD4
02:00 ~ 03:30 1.50 DRILL P PROD4
03:30 - 04:00 0.50 DRILL P PROD4
04:00 - 06:00 2.00 DRILL P PROD4
06:00 - 06:30 0.50 DRILL P PROD4
06:30 - 08:00 1.50 DRILL P PROD4
08:00 - 08:30 0.50 DRILL P PROD4
08:30 - 09:00 0.50 STWHIP P COMP
09:00 - 10:30 1.50 STWHIP P COMP
10:30 - 13:00
13:00 - 13:30
2.50 STWHIP P
0.50 STWHIP P
13:30 - 17:00
3.50 STWHIP P
17:00 - 19:30
2.50 STWHIP P
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Description of Operations
7.5 TQ ON, 7.0 TQ OFF, 5 - 10K WOB,
Cal ECD 10.90, Act ECD 11.43
Printed: 5/312004 8:46:01 AM
BP EXPLORATION
Operations Summary Report
Page 32 of 34
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L -201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From - To Hours Task Code NPT Phase . Descriptionçf@peratiops
4/27/2004 19:30 - 20:30 1.00 CASE P COMP Rig up Hydraulic Casing Tongs & related equipment to run 4.5"
Slotted Production Liner.
20:30 - 21:45 1.25 CASE P COMP SAFETY --- Held PJSM with rig crew & Baker Service Reps on
running 4.5" Liner & M/U Hook-Hanger assembly.
21 :45 - 00:00 2.25 CASE P COMP M/U 4-1/2" Float Shoe (Bent) Jt + 87 Jts of 4-1/2" 12.6#, L-80,
IBT-M slotted liner to 3672'.
M/U Torque = 3200 FtLb
4/28/2004 00:00 - 00:30 0.50 CASE P COMP Finish M/U 4-1/2" Float Shoe (Bent) Jt + 89 Jts of 4-1/2" 12.6#,
L-80, IBT-M slotted liner + 1 Jt of solid liner + XO Pup Jt & BOT
Flanged Hook Hanger assembly. Total length = 3825.29'
M/U Torque = 3200 FtLb
P/U Wt = 72k --S/O Wt = 60k-- Theoretical Liner Wt in mud =
41 ,500 Lbs
00:30 - 01 :00 0.50 CASE P COMP Change elevators to fit 4" DP. RID Hydraulic Casing Tongs &
related equipment.
01 :00 - 02:15 1.25 CASE P COMP Continue RIH with 4-1/2" slotted liner on 25 Stds of 4" DP. Tag
up @ 6184' on L2 L TP.
P/U 105k SIO 80k
02: 15 - 02:45 0.50 CASE P COMP POOH to 6020'. Apply 1/4 RH turn in string. Reciprocate string
to relax torque. TIH with the 4-1/2" slotted liner. Tag up @
6184'. POOH to 6020'. Apply another 1/4 turn. TIH successfully
entering the L3 lateral @ 6037".
02:45 - 04:45 2.00 CASE P COMP Continue TIH. Tag up @ 9380' indicating that the 4.5" Liner did
not enter the open hole sidetrack in the L3 lateral @ 8715'.
Original hole hole depth 9378'.
04:45 - 06:30 1.75 CASE P COMP POOH to 8700'. Apply 1/2 turn to right while pick up. TIH
successfully entering the open hole sidetrack in the L3 lateral
@ 8715'. Conitinue TIH to 9845'. Engage hook hanger on
bottom of window @ 6037' on first attempt.
06:30 - 08:00 1.50 CASE P COMP PU 10' above window and rotate string 1/2 turn. Slack-off and
run Hook-Hanger 10' below btm of window - OK. P/U string with
Hook-Hanger 10' above window. Re-orient hook hanger and
Land out with Hook-Hanger on bottom of window @ 6037-0K.
P/U Wt = 150k SIO Wt = 85k, Set down 20k on top of hanger.
Shoe at 9845'. Top of hook hanger at 6020'.
Drop 29/32" ball & pump on seat. Pressure up to 3000 psi to
release HWH Running tool. P/U Drill string 10' & verify HWH
Running tool released. Lost 37k string wt. Set back down & tag
Hook-Hanger with 25k-0K. P/U on string with Running Tool
above Hook-Hanger. R/U Side Entry Pump-in sub into the 4"
DP. Pressure up to 4900 psi & blow ball seat. RID pump-in
sub. M/U TDS.
08:00 - 09:30 1.50 CASE P COMP P/U on string placing end of DP @ 6000'. CBU @ 6 bpm wi
1100 psi. Flow check. Pump slug.
09:30 - 12:30 3.00 CASE P COMP POOH with 4" DP. UD Baker's Liner Running Tool.
12:30 - 13:00 0.50 CASE P COMP R/U Handling tools for LEM.
13:00 - 13:30 0.50 CASE P COMP SAFETY --- Held PJSM with rig crew & Baker on picking up &
running LEM assembly.
13:30 - 18:30 5.00 CASE P COMP P/U ZXP Packer/LEM assembly. TIH with same on 4" DP to
6006'.
P/U 134k SIO 93k
Printed: 5/312004 8:46:01 AM
)
')
···.····.·.··::;..~P.··.EXP~Q.g~1JON
, '," "."" '.,',. . ' ,
...... :..··.··:,··<··:Q:þe~·~ti..º.riS...·..·s.y.··iw1:.ro.ªry.:.···R·~·pºr~······ ...'..
,'..
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
·Oaté
':"'''':'''':''''':;'''".:'."
,P:të>r1"1~;·TEc>· HoUrs Task: Code,. N PT . Phase
4/28/2004
1.50 CASE P
COMP
18:30 - 20:00
20:00 - 20:30
0.50 CASE P
COMP
20:30 - 21 :00
0.50 CASE P
COMP
21 :00 - 23:00
2.00 CASE P
COMP
23:00 - 00:00 1.00 CASE P COMP
4/29/2004 00:00 - 01 :00 1.00 CASE P COMP
01 :00 - 01 :30 0.50 CASE P COMP
01 :30 - 06:30 5.00 CASE P COMP
06:30 - 08:30 2.00 CASE P COMP
08:30 - 14:00 5.50 CASE P COMP
14:00 - 14:30 0.50 WHSUR P COMP
14:30 - 16:00 1.50 WHSUR P COMP
16:00 - 16:30 0.50 RUNCOW COMP
16:30 - 00:00 7.50 RUNCOW COMP
4/30/2004
3.00 RUNCOW
COMP
00:00 - 03:00
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
DescriptionofOperåtions ..
Continue RIH. Sting seal assembly into Seal Bore Extension @
6196' & Land LEM in Hook-Hanger @ 6020'. P/U 10k over
string weight to verify LEM engaged-OK.
Drop the 29/32· setting ball and pump on seat @ 164 gpm wi
680 psi. Pressure up to 2500 psi, wait 2 minutes, then
increased pressure to 4000. P/U on string. Packer Setting tool
free. P/U 10' & position the rotating Dog Sub above the ZXP
Tie-back sleeve. Rotate string at 10 rpm. Slack off on string &
set down 50klbs on ZXP Packer. P/U 15'. RlU & blow ball seat
with 5075 psi.
NOTE: Top of "L3" ZXP Packer @ 5981' MDRKB.
P/U on string & place LEM Running tool @ 5980'. CBU with
346 GPM @ 1760 PSI.
Displace well to 9.3 ppg brine from 5980'.
Pumped the following sweeps:
25 bbls L VT -200 base oil
25 bbls viscosified 9.3 ppg brine
50 bbls 9.3 ppg brine with 4 drums Safe Surf 0
25 bbls viscosified 9.3 ppg brine
Follow the sweeps with 290 bbls 9.3 ppg brine until clean
returns. 430 gpm, 2025 psi.
Note: 170 bbls Versacoat left in hole.
Load MOBM on trucks. Clean MOBM from rotary table, sumps,
shakers, pits & mud return line.
Finish cleaning pits & surface equipment of MOBM.
Service TDS.
POOH. Lay down 150 Jts of 4" DP + 12 x 4.75· DC & BOT
LEM Running Tool.
TIH with 8 Std of 4" HWDP + 50 Std of 4" DP from derrick to
5407'
POOH. UD 150 Jts of 4" DP + 24 Jts of 4" HWDP. Clear rig
floor of excess drilling equipment.
Flush BOP Stack. Pull wear bushing.
RIU 4.5" tbg running equipment. RlU control line spool & hang
sheave for running I-wire. P/U tbg hanger & make dummy run.
UD same.
SAFETY--- Held PJSM with BOT, Centrilift, Cameo, Nabors
Casing and all rig personnel on making up and running
completion string.
Run 75 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing
with jewelry as per running orders. MIU and run I-wire for
Phoenix pressure sensor. Check sensor and I-wire every 1000'
of tbg run. Install 1 control line clamp per tbg joint for the 1 st 10
joints, then 1 clamp every 2 joints. Midnight depth = 3361'.
Finish running 4.5" Production String from 3361'. Ran a total of
136 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with
jewelry as per running orders. Check sensor and I-wire every
1000'. Install 1 control line clamp per tbg joint for the 1 st 10
joints, then 1 clamp every 2 joints to surface - 75 total clamps
run.
Printed: 51312004 8:46:01 AM
Legal Well Name:
Camman Well Name:
Event Name:
Cantractar Name:
Rig Name:
BPEXPLQRATION
()p~ra~j<)rl~S.Uml11ary.. 8eport
L - 201
L-201
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Page 34 af 34
Start: 3/16/2004
Rig Release: 4/30/2004
Rig Number:
Spud Date: 3/17/2004
End: 4/30/2004
Date From'" To. Haurs Task Go.de NPT Phase
4/30/2004 03:00 - 05:00 2.00 RUNCOrvP COMP
05:00 - 07:00
07:00 - 09:00
2.00 RUNCOrvP
COMP
2.00 RUNCOrvP
COMP
09:00 - 09:30 0.50 RUNCOrvP COMP
09:30 - 12:00 2.50 BOPSUF P COMP
12:00 - 15:00 3.00 WHSUR P COMP
15:00 ~ 16:00 1.00 WHSUR P CaMP
16:00 - 19:30 3.50 WHSUR P COMP
19:30 - 20:00
20:00 - 21 :00
21 :00 - 22:00
0.50 WHSUR P
CaMP
1.00 WHSUR P
1.00 WHSUR P
COMP
COMP
Descriptian af Qperations
Tag up on NO-GO @ 6001'. M/U space out pups. Run I-wire
through hanger & secure. Shell test Tubing Hanger to 5000
psi-OK. Land Tubing Hanger in wellhead. Space out tbg 2'
above NO-GO placing the mule shoe at 5999'. RILDS and test
I-wire-OK.
Reverse circulate 94 bbls clean brine followed by 3 bbls
corrosion inhibited brine, followed by 158 bbls clean brine.
Placing corrosion inhibited brine between packer and lower
GLM. 3 bpm @ 150 psi.
Drop 1-7/8" ball-rod & let gravitate on seat. Pressure up tubing
to 4500 psi to set packer. Bleed pressure to 3500 psi and hold
for 30 minutes for tbg test. Bleed tbg pressure to 2500 psi and
pressure up annulus to 3500 psi, hold for 30 minute for annular
and packer test. Bleed both tbg and annulus pressure to 0 psi.
Pressure up annulus, DCK valve sheared at 3000 psi. Circulate
through the tubing to ensure DCK was open.
UD 4.5" tubing landing joint. Install TWCV.
UD Mouse Hole, pull Bell-nipple. NID BOP.
N/U FMC 11" 5K x 4-1/16" 5K Tubing head adapter. Terminate
I-Wire through adapter flange. N/U 4-1/16" 5K Production Tree.
Test tubing head adapter & tree to 5000 psi. Test was API.
R/U DSM lubricator. Pull TWCV.
Held PJSM with Rig Crew & Little Red Hot Oil Service rep
regarding freeze protecting operations. R/U Hot Oil & test lines
to 2000 psi. Freeze protect 4.5" x 7 5/8" annulus. Reverse
circulate 150 bbl of diesel down 4.5" x 75/8" annulus @ 2 bpm
with 1250 psi. Let well U-Tube & equalize.
DSM install BPV in Tubing Hanger. Test to 1000 psi form
below.
RID Hot Oil Line. DSM install VR Plugs in Tubing Spool outlets.
Install needle valves & gauges on wellhead wing valve outlets.
Secure well. Clean up cellar area.
Release Rig @ 22:00 Hrs April 30, 2004
Printed: 5/312004 8:46:01 AM
) ')
bp
L-201 L3 Survey Report Schlumberger
Report Date: 26-Apr-04 Survey I DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 130.000·
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure I Slot: L-PAD / N-U TVD Reference Datum: Rotary Table
Well: L-201 TVD Reference Elevation: 78.70 ft relative to MSL
Borehole: L·201 L3 Sea Bed I Ground Level Elevation: 50.20 ft relative to MSL
UWI/API#: 500292320262 Magnetic Declination: 24.980·
Survey Name / Date: L-201 L3/ April 26, 2004 Total Field Strength: 57562.697 nT
Torti AHD I DDII ERD ratio: 360.625· 17541.80 ft/6.777 11.682 Magnetic Dip: 80.824·
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 29, 2004
Location LatlLong: N 70.35073717, W 149.32347531 Magnetic Declination Model: BGGM 2003
Location Grid N/E Y/X: N 5978320.840 ftUS, E 583325.340 ftUS North Reference: True North
Grid Convergence Angle: +0.63713312· Total Corr Mag North -> True North: +24.980·
Grid Scale Factor: 0.99990789 Local Coordinates Referenced To: Well Head
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/1 00 ft ) ( deg/100 ft ) (deg/100 ft) (ftUS) (ftUS)
0.00 0.00 0.00 -78.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5978320.84 583325.34 N 70.35073717 W 149.32347531
124.00 0.22 237.38 45.30 124.00 -0.07 0.24 -0.13 -0.20 0.18 0.18 0.00 5978320.71 583325.14 N 70.35073682 W 149.32347694
224.00 0.52 340.14 145.30 224.00 -0.52 0.75 0.19 -0.52 0.61 0.30 1 02.76 5978321.03 583324.82 N 70.35073770 W 149.32347951
324.00 2.13 19.40 245.27 323.97 -1.57 3.00 2.37 -0.05 1.76 1.61 39.26 5978323.21 583325.26 N 70.35074366 W 149.32347575
395.00 4.15 21.01 316.16 394.86 -2.87 6.89 6.02 1.31 2.85 2.85 2.27 5978326.87 583326.58 N 70.35075361 W 149.32346471
495.00 5.88 17.19 415.77 494.47 -6.03 15.63 14.29 4.12 1.76 1.73 -3.82 5978335.17 583329.30 N 70.35077621 W 149.32344189
595.00 8.86 11.46 514.94 593.64 -11.70 28.45 26.73 7.16 3.07 2.98 -5.73 5978347.65 583332.20 N 70.35081020 W 149.32341717
695.00 11.87 12.48 613.29 691.99 -20.13 46.44 44.33 10.92 3.02 3.01 1.02 5978365.28 583335.76 N 70.35085827 W 149.32338670
758.99 14.48 14.62 675.59 754.29 -26.60 61.02 58.50 14.36 4.15 4.08 3.34 5978379.49 583339.05 N 70.35089697 W 149.32335876
853.05 17.37 16.52 766.04 844.74 -37.24 86.82 83.34 21.32 3.12 3.07 2.02 5978404.41 583345.73 N 70.35096485 W 149.32330224
947.46 19.62 16.37 855.56 934.26 -49.21 116.77 112.06 29.80 2.38 2.38 -0.16 5978433.22 583353.88 N 70.35104332 W 149.32323343
1040.82 22.84 16.89 942.58 1021.28 -62.61 150.57 144.45 39.48 3.45 3.45 0.56 5978465.71 583363.21 N 70.35113179 W 149.32315481
1132.91 25.75 16.87 1026.50 1105.20 -77.48 188.45 180.70 50.48 3.16 3.16 -0.02 5978502.07 583373.80 N 70.35123083 W 149.32306550
1226.13 27.99 17.46 1109.65 1188.35 -93.82 230.58 220.95 62.92 2.42 2.40 0.63 5978542.46 583385.79 N 70.35134079 W 149.32296450
1321.50 29.42 18.07 1193.30 1272.00 -111.15 276.39 264.57 76.90 1.53 1.50 0.64 5978586.22 583399.29 N 70.35145995 W 149.32285099
1416.81 31.11 18.21 1275.62 1354.32 -129.04 324.42 310.22 91.86 1.77 1.77 0.15 5978632.03 583413.74 N 70.35158465 W 149.32272956
1511.08 32.79 18.97 1355.60 1434.30 -147.24 374.31 357.49 107.77 1.83 1.78 0.81 5978679.48 583429.12 N 70.35171381 W 149.32260040
1604.81 34.13 19.21 1433.80 1512.50 -165.68 425.98 406.33 124.67 1.44 1.43 0.26 5978728.49 583445.47 N 70.35184722 W 149.32246316
1699.54 33.73 19.32 1512.40 1591.10 -184.40 478.86 456.24 142.12 0.43 -0.42 0.12 5978778.59 583462.36 N 70.35198358 W 149.32232152
1797.56 36.27 18.62 1592.68 1671.38 -204.58 535.08 509.41 160.38 2.62 2.59 -0.71 5978831.96 583480.03 N 70.35212883 W 149.32217323
1892.80 37.18 18.91 1669.02 1747.72 -225.21 592.03 563.33 178.70 0.97 0.96 0.30 5978886.07 583497.75 N 70.35227614 W 149.32202448
1988.07 39.87 19.15 1743.55 1822.25 -246.44 651.36 619.42 198.05 2.83 2.82 0.25 5978942.37 583516.48 N 70.35242937 W 149.32186737
2081.93 41.57 20.11 1814.68 1893.38 -267.74 712.59 677.09 218.63 1.93 1.81 1.02 5979000.26 583536.41 N 70.35258691 W 149.32170029
2175.78 42.75 19.75 1884.25 1962.95 -289.36 775.58 736.31 240.10 1.28 1.26 -0.38 5979059.70 583557.22 N 70.35274869 W 149.32152597
2269.96 45.03 20.88 1952.12 2030.82 -311.34 840.87 797.53 262.78 2.56 2.42 1.20 5979121.17 583579.21 N 70.35291593 W 149.32134182
2361.74 45.50 21.16 2016.71 2095.41 -332.55 906.07 858.39 286.17 0.56 0.51 0.31 5979182.28 583601.92 N 70.35308219 W 149.32115193
2458.33 47.95 21.23 2082.92 2161.62 -355.21 976.38 923.95 311.59 2.54 2.54 0.07 5979248.11 583626.61 N 70.35326130 W 149.32094549
2552.24 48.94 21.51 2145.22 2223.92 -377.66 1046.66 989.39 337.20 1.08 1.05 0.30 5979313.83 583651.48 N 70.35344008 W 149.32073755
2645.64 49.74 21.45 2206.07 2284.77 -400.17 1117.51 1055.32 363.14 0.86 0.86 -0.06 5979380.04 583676.69 N 70.35362019 W 149.32052688
2740.10 50.69 21.63 2266.52 2345.22 -423.15 1190.10 1122.84 389.79 1.02 1.01 0.19 5979447.84 583702.59 N 70.35380464 W 149.32031046
2834.26 50.10 21.09 2326.54 2405.24 -446.34 1262.64 1190.40 416.22 0.77 -0.63 -0.57 5979515.68 583728.26 N 70.35398921 W 149.32009588
2928.38 49.29 22.08 2387.43 2466.13 -469.01 1334.42 1257.15 442.62 1.18 -0.86 1.05 5979582.71 583753.91 N 70.35417154 W 149.31988149
3022.90 49.04 23.22 2449.23 2527.93 -490.34 1405.93 1323.14 470.16 0.95 -0.26 1.21 5979649.00 583780.71 N 70.35435183 W 149.31965786
3117.47 48.89 23.30 2511.32 2590.02 -510.89 1477.27 1388.68 498.33 0.17 -0.16 0.08 5979714.84 583808.15 N 70.35453086 W 149.31942910
3152.16 49.11 23.20 2534.08 2612.78 -518.43 1503.45 1412.73 508.66 0.67 0.63 -0.29 5979739.01 583818.21 N 70.35459658 W 149.31934517
3266.50 47.43 25.10 2610.19 2688.89 -541.75 1588.77 1490.59 543.55 1.92 -1.47 1.66 5979817.25 583852.23 N 70.35480928 W 149.31906183
3325.61 49.36 23.06 2649.43 2728.13 -553.88 1632.97 1530.95 561.57 4.16 3.27 -3.45 5979857.79 583869.80 N 70.35491951 W 149.31891549
3420.36 50.09 23.79 2710.69 2789.39 -574.50 1705.25 1597.27 590.31 0.97 0.77 0.77 5979924.43 583897.80 N 70.35510071 W 149.31868208
3515.35 49.54 23.70 2771.98 2850.68 -594.82 1777.82 1663.70 619.53 0.58 -0.58 -0.09 5979991.17 583926.28 N 70.35528217 W 149.31844476
3609.16 49.34 23.32 2832.98 2911.68 -615.05 1849.09 1729.05 647.96 0.37 -0.21 -0.41 5980056.83 583953.98 N 70.35546071 W 149.31821387
3701.35 50.03 21.52 2892.63 2971.33 -636.28 1919.38 1794.03 674.77 1.67 0.75 -1.95 5980122.09 583980.05 N 70.35563821 W 149.31799618
3794.96 50.31 21.39 2952.59 3031.29 -659.14 1991.27 1860.94 701.06 0.32 0.30 -0.14 5980189.28 584005.60 N 70.35582099 W 149.31778262
3888.81 50.23 21.33 3012.57 3091.27 -682.21 2063.45 1928.16 727.35 0.10 -0.09 -0.06 5980256.78 584031.14 N 70.35600462 W 149.31756910
3982.46 49.83 20.65 3072. 73 3151.43 -705.59 2135.22 1995.16 753.06 0.70 -0.43 -0.73 5980324.07 584056.10 N 70.35618767 W 149.31736028
4076.83 49.57 20.57 3133.77 3212.47 -729.49 2207.19 2062.53 778.39 0.28 -0.28 -0.08 5980391.70 584080.68 N 70.35637170 W 149.31715449
4172.21 49.68 19.90 3195.56 3274.26 -754.06 2279.86 2130.71 803.52 0.55 0.12 -0.70 5980460.15 584105.05 N 70.35655795 W 149.31695036
4266.06 48.39 21.00 3257.08 3335.78 -777.78 2350.72 2197.11 828.28 1.63 -1.37 1.17 5980526.82 584129.06 N 70.35673934 W 149.31674930
4360.01 47.90 21.14 3319.77 3398.47 -800.48 2420.70 2262.41 853.43 0.53 -0.52 0.15 5980592.38 584153.49 N 70.35691772 W 149.31654495
4454.28 47.80 22.75 3383.03 3461.73 -822.14 2490.59 2327.23 879.55 1.27 -0.11 1.71 5980657.49 584178.88 N 70.35709480 W 149.31633280
4548.11 48.18 26.94 3445.85 3524.55 -840.35 2560.29 2390.47 908.84 3.34 0.40 4.47 5980721.04 584207.46 N 70.35726755 W 149.31609491
4641.89 48.96 31.87 3507.92 3586.62 -853.25 2630.58 2451.68 943.36 4.03 0.83 5.26 5980782.62 584241.29 N 70.35743475 W 149.31581454
4735.40 48.79 36.31 3569.44 3648.14 -860.51 2701.01 2509.98 982.82 3.58 -0.18 4.75 5980841.36 584280.10 N 70.35759404 W 149.31549403
4829.57 48.97 40.88 3631.39 3710.09 -862.24 2771.93 2565.40 1027.05 3.66 0.19 4.85 5980897.26 584323.71 N 70.35774541 W 149.31513475
4923.41 48.83 47.15 3693.11 3771.81 -857.30 2842.62 2616.21 1076.14 5.04 -0.15 6.68 5980948.61 584372.22 N 70.35788420 W 149.31473606
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31 rt-546 )
N-UIL-201IL-201 L31L-201 L3
Generated 5/5/2004 2:00 PM Page 1 of 3
) )
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(It ) (deg) (deg) (It ) (It ) (It ) (It ) (It) (It ) ( deg/100 It ) (deg/100 It) (deg/100 It) (ltUS) (ltUS)
5016.44 49.09 54.19 3754.24 3832.94 -844.31 2912.75 2660.62 1130.36 5.71 0.28 7.57 5980993.62 584425.94 N 70.35800551 W 149.31429571
5110.60 48.23 58.33 3816.45 3895.15 -824.54 2983.43 2699.89 1189.11 3.42 -0.91 4.40 5981033.53 584484.25 N 70.35811275 W 149.31381851
5204.87 49.16 62.86 3878.69 3957.39 -799.63 3054.23 2734.62 1250.78 3.74 0.99 4.81 5981068.94 584545.52 N 70.35820761 W 149.31331763
5298.92 47.75 68.46 3941.09 4019.79 -769.20 3124.59 2763.65 1314.85 4.70 -1.50 5.95 5981098.67 584609.26 N 70.35828687 W 149.31279728
5392.93 49.39 73.49 4003.32 4082.02 -732.92 3195.05 2786.57 1381.46 4.37 1.74 5.35 5981122.34 584675.60 N 70.35834947 W 149.31225633
5487.16 51.11 80.03 4063.61 4142.31 -689.56 3267.47 2803.10 1451.92 5.64 1.83 6.94 5981139.64 584745.86 N 70.35839458 W 149.31168408
5582.88 53.94 84.88 4121.86 4200.56 -638.27 3343.41 2813.00 1527.19 4.99 2.96 5.07 5981150.39 584821.01 N 70.35842161 W 149.31107280
5677.97 56.15 89.22 4176.36 4255.06 -581.23 3421.33 2816.97 1604.99 4.40 2.32 4.56 5981155.22 584898.75 N 70.35843241 W 149.31044097
5769.98 58.26 91.53 4226.20 4304.90 -521.65 3498.66 2816.45 1682.32 3.12 2.29 2.51 5981155.56 584976.08 N 70.35843093 W 149.30981296
5862.16 59.02 94.81 4274.18 4352.88 -458.65 3577.37 2812.09 1760.89 3.15 0.82 3.56 5981152.07 585054.69 N 70.35841896 W 149.30917484
5955.46 61.37 98.97 4320.56 4399.26 -390.85 3658.32 2802.35 1841.23 4.62 2.52 4.46 5981143.22 585135.12 N 70.35839229 W 149.30852243
6025.00 63.75 101.66 4352.61 4431.31 -337.24 3720.02 2791.28 1901.93 4.85 3.42 3.87 5981132.83 585195.94 N 70.35836203 W 149.30802947
6037.00 65.61 102.17 4357.74 4436.44 -327.67 3730.87 2789.04 1912.55 15.97 15.50 4.25 5981130.71 585206.58 N 70.35835590 W 149.30794329
6067.17 69.45 102.59 4369.27 4447.97 -302.97 3758.75 2783.06 1939.77 12.79 12.73 1.39 5981125.04 585233.87 N 70.35833955 W 149.30772220
6098.49 73.46 103.02 4379.23 4457.93 -276.56 3788.43 2776.48 1968.72 12.87 12.80 1.37 5981118.78 585262.88 N 70.35832155 W 149.30748711
6129.29 77.29 1 03.45 4387.01 4465.71 -249.96 3818.23 2769.66 1997.73 12.51 12.44 1.40 5981112.28 585291.96 N 70.35830289 W 149.30725157
6160.61 80.90 103.88 4392.93 4471.63 -222.40 3848.98 2762.40 2027.60 11.60 11.53 1.37 5981105.35 585321.91 N 70.35828302 W 149.30700894
6191.13 83.52 104.30 4397.07 4475.77 -195.20 3879.21 2755.03 2056.93 8.69 8.58 1.38 5981098.32 585351.32 N 70.35826289 W 149.30677080
6223.02 83.49 104.20 4400.67 4479.37 -166.66 3910.90 2747.24 2087.64 0.33 -0.09 -0.31 5981090.86 585382.11 N 70.35824156 W 149.30652142
6254.04 85.41 106.75 4403.68 4482.38 -138.58 3941.77 2739.00 2117.39 10.26 6.19 8.22 5981082.95 585411.95 N 70.35821903 W 149.30627983
6284.62 89.47 108.79 4405.04 4483.74 -110.31 3972.32 2729.68 2146.48 14.85 13.28 6.67 5981073.96 585441.13 N 70.35819354 W 149.30604365
6315.35 93.21 111.40 4404.32 4483.02 -81 .43 4003.03 2719.12 2175.32 14.84 12.17 8.49 5981063.73 585470.09 N 70.35816469 W 149.30580943
6347.35 95.13 111.33 4402.00 4480.70 -51.19 4034.95 2707.50 2205.04 6.00 6.00 -0.22 5981052.43 585499.93 N 70.35813291 W 149.30556810
6378.38 95.10 112.78 4399.23 4477.93 -21.78 4065.85 2695.89 2233.68 4.66 -0.10 4.67 5981041.15 585528.70 N 70.35810118 W 149.30533551
6409.80 95.11 113.80 4396.43 4475.13 8.19 4097.15 2683.52 2262.43 3.23 0.03 3.25 5981029.10 585557.58 N 70.35806735 W 149.30510210
6441.44 95.58 115.26 4393.49 4472.19 38.55 4128.65 2670.44 2291.09 4.83 1.49 4.61 5981016.34 585586.38 N 70.35803160 W 149.30486940
6472.14 94.42 115.42 4390.81 4469.51 68.14 4159.23 2657.35 2318.73 3.81 -3.78 0.52 5981003.56 585614.16 N 70.35799582 W 149.30464497
6503.35 95.03 116.94 4388.24 4466.94 98.34 4190.34 2643.63 2346.64 5.23 1.95 4.87 5980990.15 585642.22 N 70.35795831 W 149.30441833
6534.97 95.27 120.06 4385.40 4464.10 129.20 4221.83 2628.60 2374.31 9.86 0.76 9.87 5980975.43 585670.06 N 70.35791724 W 149.30419364
6565.63 95.17 121.20 4382.61 4461.31 159.32 4252.36 2613.05 2400.58 3.72 -0.33 3.72 5980960.17 585696.50 N 70.35787472 W 149.30398033
6597.06 95.27 122.26 4379.75 4458.45 190.29 4283.66 2596.59 2427.21 3.37 0.32 3.37 5980944.01 585723.30 N 70.35782973 W 149.30376418
6627.98 95.24 122.20 4376.92 4455.62 220.80 4314.45 2580.17 2453.25 0.22 -0.10 -0.19 5980927.88 585749.52 N 70.35778484 W 149.30355271
6658.52 94.72 120.34 4374.27 4452.97 250.87 4344.88 2564.37 2479.26 6.30 -1.70 -6.09 5980912.38 585775.70 N 70.35774168 W 149.30334158
6689.96 92.73 117.86 4372.22 4450.92 281.68 4376.25 2549.12 2506.67 10.10 -6.33 -7.89 5980897.43 585803.27 N 70.35769998 W 149.30311902
6722.28 92.11 118.28 4370.86 4449.56 313.27 4408.54 2533.92 2535.16 2.32 -1.92 1.30 5980882.56 585831.93 N 70.35765844 W 149.30288768
6753.12 92.49 119.35 4369.62 4448.32 343.50 4439.35 2519.07 2562.16 3.68 1.23 3.47 5980868.01 585859.09 N 70.35761784 W 149.30266847
6784.35 92.52 119.42 4368.26 4446.96 374.16 4470.55 2503.76 2589.34 0.24 0.10 0.22 5980853.00 585886.44 N 70.35757599 W 149.30244774
6816.02 92.73 119.54 4366.81 4445.51 405.27 4502.19 2488.19 2616.88 0.76 0.66 0.38 5980837.74 585914.15 N 70.35753343 W 149.30222413
6846.65 92.38 118.96 4365.44 4444.14 435.33 4532.79 2473.24 2643.58 2.21 -1.14 -1.89 5980823.09 585941.01 N 70.35749256 W 149.30200736
6877.53 90.50 121.42 4364.67 4443.37 465.75 4563.66 2457.72 2670.26 10.02 -6.09 7.97 5980807.87 585967.86 N 70.35745013 W 149.30179075
6909.80 90.26 121.06 4364.45 4443.15 497.64 4595.93 2440.99 2697.85 1.34 -0.74 -1.12 5980791.44 585995.63 N 70.35740438 W 149.30156674
6940.05 90.57 118.38 4364.23 4442.93 527.40 4626.18 2425.99 2724.12 8.92 1.02 -8.86 5980776.74 586022.06 N 70.35736339 W 149.30135348
6971.84 90.02 120.46 4364.07 4442.77 558.65 4657.97 2410.38 2751.81 6.77 -1.73 6.54 5980761.44 586049.92 N 70.35732071 W 149.30112867
7002.09 91.29 119.49 4363.72 4442.42 588.43 4688.21 2395.26 2778.01 5.28 4.20 -3.21 5980746.62 586076.28 N 70.35727940 W 149.30091594
7032.71 89.74 120.63 4363.45 4442.15 618.59 4718.83 2379.93 2804.51 6.28 -5.06 3.72 5980731.58 586102.95 N 70.35723747 W 149.30070080
7064.12 89.37 119.22 4363.69 4442.39 649.51 4750.24 2364.26 2831.73 4.64 -1.18 -4.49 5980716.22 586130.34 N 70.35719464 W 149.30047979
7095.24 89.43 119.61 4364.02 4442.72 680.10 4781.36 2348.98 2858.84 1.27 0.19 1.25 5980701.24 586157.61 N 70.35715286 W 149.30025972
7127.33 90.09 120.48 4364.15 4442.85 711.71 4813.45 2332.91 2886.61 3.40 2.06 2.71 5980685.48 586185.56 N 70.35710894 W 149.30003420
7156.37 90.46 120.75 4364.01 4442.71 740.36 4842.49 2318.12 2911.61 1.58 1.27 0.93 5980670.97 586210.72 N 70.35706851 W 149.29983129
7188.49 89.06 122.08 4364.15 4442.85 772.12 4874.61 2301.38 2939.02 6.01 -4.36 4.14 5980654.54 586238.31 N 70.35702274 W 149.29960876
7219.01 88.78 121.55 4364.72 4443.42 802.32 4905.12 2285.29 2964.95 1.96 -0.92 -1.74 5980638.74 586264.41 N 70.35697877 W 149.29939825
7250.14 89.06 122.40 4365.31 4444.01 833.14 4936.25 2268.81 2991.35 2.87 0.90 2.73 5980622.56 586290.99 N 70.35693371 W 149.29918390
7282.07 88.75 121.85 4365.92 4444.62 864.76 4968.17 2251.83 3018.38 1.98 -0.97 -1.72 5980605.88 586318.22 N 70.35688731 W 149.29896441
7312.23 88.54 124.48 4366.63 4445.33 894.70 4998.32 2235.34 3043.62 8.75 -0.70 8.72 5980589.67 586343.63 N 70.35684222 W 149.29875952
7343.68 88.72 121.62 4367.38 4446.08 925.91 5029.76 2218.20 3069.97 9.11 0.57 -9.09 5980572.82 586370.17 N 70.35679535 W 149.29854559
7373.72 88.75 123.81 4368.05 4446.75 955.69 5059.80 2201.97 3095.24 7.29 0.10 7.29 5980556.88 586395.61 N 70.35675098 W 149.29834047
7405.43 90.40 121.45 4368.28 4446.98 987.14 5091.50 2184.87 3121.94 9.08 5.20 -7.44 5980540.08 586422.50 N 70.35670425 W 149.29812369
7436.75 90.53 123.10 4368.03 4446.73 1018.17 5122.82 2168.15 3148.42 5.28 0.42 5.27 5980523.66 586449.16 N 70.35665853 W 149.29790873
7468.41 90.57 121.71 4367.72 4446.42 1049.55 5154.48 2151.18 3175.15 4.39 0.13 -4.39 5980506.99 586476.07 N 70.35661215 W 149.29769174
7499.57 89.95 122.55 4367.58 4446.28 1080.42 5185.64 2134.61 3201.54 3.35 -1.99 2.70 5980490.71 586502.64 N 70.35656685 W 149.29747753
7531.47 89.54 119.47 4367.73 4446.43 1111.92 5217.54 2118.18 3228.87 9.74 -1.29 -9.66 5980474.59 586530.16 N 70.35652193 W 149.29725560
7561.83 88.89 118.27 4368.14 4446.84 1141.71 5247.90 2103.52 3255.46 4.49 -2.14 -3.95 5980460.23 586556.90 N 70.35648185 W 149.29703978
7590.92 88.61 119.15 4368.78 4447.48 1170.23 5276.98 2089.55 3280.96 3.17 -0.96 3.03 5980446.54 586582.56 N 70.35644366 W 149.29683270
7623.38 88.58 118.53 4369.57 4448.27 1202.06 5309.43 2073.90 3309.39 1.91 -0.09 -1.91 5980431.21 586611.15 N 70.35640086 W 149.29660193
7652.38 89.02 116.24 4370.18 4448.88 1230.36 5338.42 2060.56 3335.13 8.04 1.52 -7.90 5980418.16 586637.04 N 70.35636440 W 149.29639294
7683.48 89.09 116.61 4370.69 4449.39 1260.58 5369.52 2046.72 3362.98 1.21 0.23 1.19 5980404.64 586665.04 N 70.35632656 W 149.29616687
7714.85 88.47 116.22 4371.36 4450.06 1291.07 5400.88 2032.77 3391.07 2.33 -1.98 -1.24 5980391.00 586693.28 N 70.35628841 W 149.29593883
7745.61 88.44 116.39 4372.19 4450.89 1320.94 5431.63 2019.14 3418.63 0.56 -0.10 0.55 5980377.68 586720.99 N 70.35625115 W 149.29571505
7774.09 87.68 116.91 4373.15 4451.85 1348.64 5460.10 2006.38 3444.07 3.23 -2.67 1.83 5980365.20 586746.56 N 70.35621624 W 149.29550852
7806.71 87.58 118.22 4374.50 4453.20 1380.46 5492.69 1991.30 3472.96 4.02 -0.31 4.02 5980350.44 586775.62 N 70.35617500 W 149.29527397
7837.79 88.23 119.57 4375.64 4454.34 1410.94 5523.75 1976.29 3500.15 4.82 2.09 4.34 5980335.74 586802.97 N 70.35613397 W 149.29505322
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31 rt-546 )
N-U\L-201\L-201 L3\L-201 L3
Generated 5/5/2004 2:00 PM Page 2 of 3
') )
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rata Walk Rata Northing Eastlng Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( degf1 00 ft ) ( degf1 00 ft ) ( degf100 ft ) (ftUS) (ftUS)
7867.60 88.27 119.45 4376.55 4455.25 1440.24 5553.54 1961.61 3526.08 0.42 0.13 -0.40 5980321.35 586829.06 N 70.35609384 W 149.29484271
7898.39 88.37 116.56 4377 .45 4456.15 1470.34 5584.32 1947.16 3553.26 9.39 0.32 -9.39 5980307.21 586856.39 N 70.35605433 W 149.29462214
7928.76 87.99 116.47 4378.42 4457.12 1499.86 5614.67 1933.61 3580.42 1.29 -1.25 -0.30 5980293.96 586883.70 N 70.35601727 W 149.29440164
7959.52 88.20 116.29 4379.44 4458.14 1529.74 5645.42 1919.95 3607.96 0.90 0.68 -0.59 5980280.61 586911.39 N 70.35597992 W 149.29417805
7990.53 87.85 116.56 4380.51 4459.21 1559.86 5676.41 1906.16 3635.71 1.43 -1.13 0.87 5980267.13 586939.29 N 70.35594220 W 149.29395274
8020.99 87.31 117.62 4381.79 4460.49 1589.52 5706.84 1892.30 3662.81 3.90 -1.77 3.48 5980253.57 586966.53 N 70.35590431 W 149.29373279
8051.50 87.93 116.47 4383.06 4461.76 1619.23 5737.33 1878.44 3689.96 4.28 2.03 -3.77 5980240.02 586993.83 N 70.35586641 W 149.29351238
8082.17 88.20 118.70 4384.10 4462.80 1649.17 5767.98 1864.25 3717.12 7.32 0.88 7.27 5980226.13 587021.15 N 70.35582760 W 149.29329185
8112.99 87.96 120.34 4385.13 4463.83 1679.45 5798.78 1849.07 3743.92 5.37 -0.78 5.32 5980211.25 587048.12 N 70.35578610 W 149.29307426
8143.89 87.65 120.51 4386.31 4465.01 1709.90 5829.66 1833.43 3770.55 1.14 -1.00 0.55 5980195.91 587074.92 N 70.35574334 W 149.29285813
8173.86 87.00 122.75 4387.71 4466.41 1739.52 5859.59 1817.73 3796.04 7.77 -2.17 7.47 5980180.50 587100.58 N 70.35570042 W 149.29265123
8205.63 87.17 125.08 4389.33 4468.03 1771.06 5891.32 1800.03 3822.37 7.34 0.54 7.33 5980163.09 587127.10 N 70.35565202 W 149.29243751
8235.82 86.82 125.40 4390.91 4469.61 1801.11 5921.47 1782.64 3846.99 1.57 -1.16 1.06 5980145.97 587151.91 N 70.35560446 W 149.29223763
8266.75 86.65 126.22 4392.67 4471.37 1831.91 5952.35 1764.57 3872.03 2.70 -0.55 2.65 5980128.19 587177.15 N 70.35555507 W 149.29203437
8297.62 87.00 129.37 4394.38 4473.08 1862.70 5983.17 1745.68 3896.39 10.25 1.13 10.20 5980109.57 587201.71 N 70.35550344 W 149.29183670
8328.73 87.10 129.44 4395.98 4474.68 1893.77 6014.24 1725.96 3920.39 0.39 0.32 0.23 5980090.12 587225.93 N 70.35544952 W 149.29164185
8360.17 87.89 131.46 4397.36 4476.06 1925.18 6045.65 1705.58 3944.29 6.89 2.51 6.43 5980070.01 587250.05 N 70.35539382 W 149.29144787
8390.77 88.17 134.05 4398.41 4477.11 1955.72 6076.23 1684.82 3966.75 8.51 0.92 8.46 5980049.51 587272.73 N 70.35533708 W 149.29126564
8421.23 88.13 133.80 4399.39 4478.09 1986.09 6106.68 1663.70 3988.67 0.83 -0.13 -0.82 5980028.63 587294.89 N 70.35527935 W 149.29108768
8452.92 89.19 135.82 4400.13 4478.83 2017.66 6138.36 1641.38 4011.15 7.20 3.34 6.37 5980006.56 587317.61 N 70.35521832 W 149.29090529
8484.40 91.87 138.37 4399.84 4478.54 2048.89 6169.84 1618.32 4032.57 11.75 8.51 8.10 5979983.75 587339.29 N 70.35515531 W 149.29073141
8515.24 92.14 139.39 4398.76 4477.46 2079.34 6200.66 1595.11 4052.84 3.42 0.88 3.31 5979960.76 587359.82 N 70.35509185 W 149.29056693
8546.65 92.76 139.43 4397.42 4476.12 2110.30 6232.04 1571.28 4073.26 1.98 1.97 0.13 5979937.16 587380.50 N 70.35502672 W 149.29040125
8577.42 95.97 142.15 4395.08 4473.78 2140.43 6262.71 1547.51 4092.65 13.66 10.43 8.84 5979913.61 587400.15 N 70.35496176 W 149.29024389
8608.76 96.89 142.46 4391.57 4470.27 2170.86 6293.86 1522.87 4111.70 3.10 2.94 0.99 5979889.19 587419.46 N 70.35489441 W 149.29008938
8640.22 95.00 145.32 4388.31 4467.01 2201.23 6325.15 1497.59 4130.13 10.86 -6.01 9.09 5979864.12 587438.18 N 70.35482533 W 149.28993979
8671.29 93.62 145.93 4385.98 4464.68 2231.07 6356.13 1472.02 4147.62 4.85 -4.44 1.96 5979838.75 587455.95 N 70.35475545 W 149.28979788
8702.65 92.70 146.68 4384.25 4462.95 2261.12 6387.44 1445.97 4165.00 3.78 -2.93 2.39 5979812.89 587473.61 N 70.35468425 W 149.28965695
8734.17 91.70 148.49 4383.04 4461.74 2291.14 6418.94 1419.38 4181.88 6.56 -3.17 5.74 5979786.50 587490.78 N 70.35461159 W 149.28951999
8765.49 92.35 146.21 4381.93 4460.63 2321.02 6450.24 1393.03 4198.76 7.57 2.08 -7.28 5979760.34 587507.96 N 70.35453957 W 149.28938300
8796.85 95.28 143.87 4379.84 4458.54 2351.23 6481.52 1367.39 4216.69 11.95 9.34 -7.46 5979734.90 587526.17 N 70.35446950 W 149.28923758
8827.80 95.21 143.54 4377.01 4455.71 2381.17 6512.34 1342.55 4234.93 1.09 -0.23 -1.07 5979710.27 587544.69 N 70.35440161 W 149.28908956
8860.34 92.28 144.59 4374.89 4453.59 2412.67 6544.81 1316.26 4253.99 9.56 -9.00 3.23 5979684.19 587564.03 N 70.35432976 W 149.28893497
8891.06 91.15 148.72 4373.97 4452.67 2442.08 6575.52 1290.61 4270.86 13.93 -3.68 13.44 5979658.74 587581.18 N 70.35425968 W 149.28879808
8923.00 89.47 151.00 4373.80 4452.50 2472.12 6607.45 1263.00 4286.90 8.87 -5.26 7.14 5979631.30 587597.52 N 70.35418420 W 149.28866801
8953.54 87.58 152.89 4374.58 4453.28 2500.43 6637.98 1236.06 4301.25 8.75 -6.19 6.19 5979604.53 587612.18 N 70.35411058 W 149.28855156
8984.50 87.55 157.09 4375.90 4454.60 2528.46 6668.92 1208.03 4314.33 13.55 -0.10 13.57 5979576.65 587625.56 N 70.35403400 W 149.28844553
9016.10 88.78 158.90 4376.91 4455.61 2556.35 6700.50 1178.75 4326.16 6.92 3.89 5.73 5979547.51 587637.72 N 70.35395399 W 149.28834959
9046.88 87.48 162.73 4377.91 4456.61 2582.76 6731.26 1149.70 4336.27 13.13 -4.22 12.44 5979518.57 587648.15 N 70.35387461 W 149.28826766
9077.63 87.68 166.69 4379.21 4457.91 2608.01 6761.98 1120.07 4344.37 12.88 0.65 12.88 5979489.04 587656.58 N 70.35379365 W 149.28820203
9108.92 88.20 170.29 4380.34 4459.04 2632.48 6793.25 1089.43 4350.61 11.62 1.66 11.51 5979458.48 587663.16 N 70.35370995 W 149.28815153
9140.61 87.27 172.71 4381.59 4460.29 2656.20 6824.92 1058.12 4355.29 8.18 -2.93 7.64 5979427.22 587668.18 N 70.35362439 W 149.28811367
9171.73 86.17 177.05 4383.37 4462.07 2678.21 6855.99 1027.18 4358.06 14.36 -3.53 13.95 5979396.32 587671.30 N 70.35353987 W 149.28809131
9203.61 88.16 180.15 4384.95 4463.65 2699.26 6887.83 995.36 4358.84 11.54 6.24 9.72 5979364.51 587672.43 N 70.35345292 W 149.28808515
9234.10 90.33 182.00 4385.35 4464.05 2718.41 6918.31 964.88 4358.27 9.35 7.12 6.07 5979334.03 587672.20 N 70.35336966 W 149.28808994
9265.19 90.29 182.60 4385.18 4463.88 2737.43 6949.40 933.81 4357.02 1.93 -0.13 1.93 5979302.95 587671.30 N 70.35328480 W 149.28810021
9296.32 90.57 182.48 4384.95 4463.65 2756.36 6980.53 902.71 4355.64 0.98 0.90 -0.39 5979271.84 587670.26 N 70.35319984 W 149.28811156
9326.11 91.01 181.28 4384.54 4463.24 2774.75 7010.32 872.94 4354.66 4.29 1.48 -4.03 5979242.07 587669.62 N 70.35311851 W 149.28811964
9357.55 89.71 182.70 4384.34 4463.04 2794.11 7041.76 841.53 4353.57 6.12 -4.13 4.52 5979210.64 587668.87 N 70.35303268 W 149.28812865
9389.23 89.47 182.21 4384.57 4463.27 2813.41 7073.44 809.88 4352.21 1.72 -0.76 -1.55 5979178.98 587667.87 N 70.35294622 W 149.28813981
9421.98 89.88 182.34 4384.75 4463.45 2833.45 7106.19 777.15 4350.91 1.31 1.25 0.40 5979146.25 587666.93 N 70.35285682 W 149.28815052
9452.68 89.47 184.35 4384.93 4463.63 2851.77 7136.88 746.51 4349.12 6.68 -1.34 6.55 5979115.59 587665.48 N 70.35277311 W 149.28816521
9483.53 90.63 183.01 4384.90 4463.60 2870.05 7167.73 715.72 4347.14 5.74 3.76 -4.34 5979084.78 587663.85 N 70.35268901 W 149.28818143
9515.45 94.48 183.68 4383.48 4462.18 2889.08 7199.62 683.89 4345.28 12.24 12.06 2.10 5979052.94 587662.34 N 70.35260206 W 149.28819668
9545.57 97.27 185.48 4380.40 4459.10 2906.44 7229.58 654.03 4342.89 11.01 9.26 5.98 5979023.06 587660.28 N 70.35252048 W 149.28821623
9576.71 96.82 185.55 4376.58 4455.28 2923.94 7260.48 623.27 4339.92 1.46 -1.45 0.22 5978992.27 587657.65 N 70.35243645 W 149.28824049
9607.62 97.41 185.76 4372.75 4451.45 2941.25 7291.15 592.75 4336.90 2.02 1.91 0.68 5978961.72 587654.97 N 70.35235307 W 149.28826517
9639.43 97.69 185.01 4368.57 4447.27 2959.16 7322.69 561.35 4333.94 2.50 0.88 -2.36 5978930.29 587652.36 N 70.35226731 W 149.28828935
9669.37 97.17 185.92 4364.70 4443.40 2975.99 7352.37 531.80 4331.11 3.48 -1.74 3.04 5978900.71 587649.86 N 70.35218657 W 149.28831244
9701.64 97.76 183.22 4360.50 4439.20 2994.54 7384.37 499.91 4328.56 8.50 1.83 -8.37 5978868.80 587647.67 N 70.35209945 W 149.28833329
9732.38 96.20 184.73 4356.77 4435.47 3012.48 7414.88 469.47 4326.45 7.04 -5.07 4.91 5978838.34 587645.89 N 70.35201631 W 149.28835061
9762.92 95.65 184.87 4353.62 4432.32 3029.99 7445.26 439.20 4323.90 1.86 -1.80 0.46 5978808.05 587643.69 N 70.35193362 W 149.28837139
9809.89 96.16 183.39 4348.78 4427.48 3057.36 7491.98 392.60 4320.54 3.32 1.09 -3.15 5978761.42 587640.84 N 70.35180632 W 149.28839893
9860.00 96.16 183.39 4343.41 4422.11 3087.08 7541.80 342.87 4317.59 0.00 0.00 0.00 5978711.66 587638.45 N 70.35167046 W 149.28842308
Leaal Description:
Northina fY} rftUSl Eastina (X) rftUSl
Surface: 2597 FSL 3588 FEL S34 T12N R11 E UM 5978320.84 583325.34
BHL: 2939 FSL 4550 FEL S35 T12N R11E UM 5978711.66 587638.45
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31 rt-546 )
N-U\L-201\L-201 L3\L-201 L3
Generated 5/5/2004 2:00 PM Page 3 of 3
) )
bp
0 L-201 L3PB1 S R rtSChlumberger
urvey epo
Report Date: 25-Apr-04 Survey / DLS Computation Method: Minimum Curvature 1 Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 130.000·
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure / Slot: L-PAD 1 N-U TVD Reference Datum: Rotary Table
Well: L-201 TVD Reference Elevation: 78.70 ft relative to MSL
Borehole: L-201L3PB1 Sea Bed / Ground Level Elevation: 50.20 ft relative to MSL
UWIfAPI#: 500292320273 Magnetic Declination: 24.980·
Survey Name / Date: L-201 L3PB11 April 25, 2004 Total Field strength: 57562.697 nT
Tort / AHD / DDI / ERD ratio: 323.415· 17057.33 ftl 6.679 1 1.574 Magnetic Dip: 80.824·
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 29, 2004
Location LatfLong: N 70.35073717, W 149.32347531 Magnetic Declination Model: BGGM 2003
Location Grid N/E Y/X: N 5978320.840 ftUS, E 583325.340 ftUS North Reference: True North
Grid Convergence Angle: -+0.63713312· Total Corr Mag North -> True North: +24.980·
Grid Scale Factor: 0.99990789 Local Coordinates Referenced To: Well Head
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft) (ft ) (ft ) (ft ) (ft ) (deg/100 ft) ( deg/100 ft ) ( deg/1 00 ft ) (ftUS) (ftUS)
0.00 0.00 0.00 -78.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5978320.84 583325.34 N 70.35073717 W 149.32347531
124.00 0.22 237.38 45.30 124.00 -0.07 0.24 -0.13 -0.20 0.18 0.18 0.00 5978320.71 583325.14 N 70.35073682 W 149.32347694
224.00 0.52 340.14 145.30 224.00 -0.52 0.75 0.19 -0.52 0.61 0.30 102.76 5978321.03 583324.82 N 70.35073770 W 149.32347951
324.00 2.13 19.40 245.27 323.97 -1.57 3.00 2.37 -0.05 1.76 1.61 39.26 5978323.21 583325.26 N 70.35074366 W 149.32347575
395.00 4.15 21.01 316.16 394.86 -2.87 6.89 6.02 1.31 2.85 2.85 2.27 5978326.87 583326.58 N 70.35075361 W 149.32346471
495.00 5.88 17.19 415.77 494.47 -6.03 15.63 14.29 4.12 1.76 1.73 -3.82 5978335.17 583329.30 N 70.35077621 W 149.32344189
595.00 8.86 11.46 514.94 593.64 -11.70 28.45 26.73 7.16 3.07 2.98 -5.73 5978347.65 583332.20 N 70.35081020 W 149.32341717
695.00 11.87 12.48 613.29 691.99 -20.13 46.44 44.33 10.92 3.02 3.01 1.02 5978365.28 583335.76 N 70.35085827 W 149.32338670
758.99 14.48 14.62 675.59 754.29 -26.60 61.02 58.50 14.36 4.15 4.08 3.34 5978379.49 583339.05 N 70.35089697 W 149.32335876
853.05 17.37 16.52 766.04 844.74 -37.24 86.82 83.34 21.32 3.12 3.07 2.02 5978404.41 583345.73 N 70.35096485 W 149.32330224
947.46 19.62 16.37 855.56 934.26 -49.21 116.77 112.06 29.80 2.38 2.38 -0.16 5978433.22 583353.88 N 70.35104332 W 149.32323343
1040.82 22.84 16.89 942.58 1021.28 -62.61 150.57 144.45 39.48 3.45 3.45 0.56 5978465.71 583363.21 N 70.35113179 W 149.32315481
1132.91 25.75 16.87 1026.50 1105.20 -77.48 188.45 180.70 50.48 3.16 3.16 -0.02 5978502.07 583373.80 N 70.35123083 W 149.32306550
1226.13 27.99 17.46 1109.65 1188.35 -93.82 230.58 220.95 62.92 2.42 2.40 0.63 5978542.46 583385.79 N 70.35134079 W 149.32296450
1321.50 29.42 18.07 1193.30 1272.00 -111.15 276.39 264.57 76.90 1.53 1.50 0.64 5978586.22 583399.29 N 70.35145995 W 149.32285099
1416.81 31.11 18.21 1275.62 1354.32 -129.04 324.42 310.22 91.86 1.77 1.77 0.15 5978632.03 583413.74 N 70.35158465 W 149.32272956
1511.08 32.79 18.97 1355.60 1434.30 -147.24 374.31 357.49 107.77 1.83 1.78 0.81 5978679.48 583429.12 N 70.35171381 W 149.32260040
1604.81 34.13 19.21 1433.80 1512.50 -165.68 425.98 406.33 124.67 1.44 1.43 0.26 5978728.49 583445.47 N 70.35184722 W 149.32246316
1699.54 33.73 19.32 1512.40 1591.10 -184.40 478.86 456.24 142.12 0.43 -0.42 0.12 5978778.59 583462.36 N 70.35198358 W 149.32232152
1797.56 36.27 18.62 1592.68 1671.38 -204.58 535.08 509.41 160.38 2.62 2.59 -0.71 5978831.96 583480.03 N 70.35212883 W 149.32217323
1892.80 37.18 18.91 1669.02 1747.72 -225.21 592.03 563.33 178.70 0.97 0.96 0.30 5978886.07 583497.75 N 70.35227614 W 149.32202448
1988.07 39.87 19.15 1743.55 1822.25 -246.44 651.36 619.42 198.05 2.83 2.82 0.25 5978942.37 583516.48 N 70.35242937 W 149.32186737
2081.93 41.57 20.11 1814.68 1893.38 -267.74 712.59 677.09 218.63 1.93 1.81 1.02 5979000.26 583536.41 N 70.35258691 W 149.32170029
2175.78 42.75 19.75 1884.25 1962.95 -289.36 775.58 736.31 240.10 1.28 1.26 -0.38 5979059.70 583557.22 N 70.35274869 W 149.32152597
2269.96 45.03 20.88 1952.12 2030.82 -311.34 840.87 797.53 262.78 2.56 2.42 1.20 5979121.17 583579.21 N 70.35291593 W 149.32134182
2361.74 45.50 21.16 2016.71 2095.41 -332.55 906.07 858.39 286.17 0.56 0.51 0.31 5979182.28 583601.92 N 70.35308219 W 149.32115193
2458.33 47.95 21.23 2082.92 2161.62 -355.21 976.38 923.95 311.59 2.54 2.54 0.07 5979248.11 583626.61 N 70.35326130 W 149.32094549
2552.24 48.94 21.51 2145.22 2223.92 -377.66 1046.66 989.39 337.20 1.08 1.05 0.30 5979313.83 583651.48 N 70.35344008 W 149.32073755
2645.64 49.74 21.45 2206.07 2284.77 -400.17 1117.51 1055.32 363.14 0.86 0.86 -0.06 5979380.04 583676.69 N 70.35362019 W 149.32052688
2740.10 50.69 21.63 2266.52 2345.22 -423.15 1190.10 1122.84 389.79 1.02 1.01 0.19 5979447.84 583702.59 N 70.35380464 W 149.32031046
2834.26 50.10 21.09 2326.54 2405.24 -446.34 1262.64 1190.40 416.22 0.77 -0.63 -0.57 5979515.68 583728.26 N 70.35398921 W 149.32009588
2928.38 49.29 22.08 2387.43 2466.13 -469.01 1334.42 1257.15 442.62 1.18 -0.86 1.05 5979582.71 583753.91 N 70.35417154 W 149.31988149
3022.90 49.04 23.22 2449.23 2527.93 -490.34 1405.93 1323.14 470.16 0.95 -0.26 1.21 5979649.00 583780.71 N 70.35435183 W 149.31965786
3117.47 48.89 23.30 2511.32 2590.02 -510.89 1477.27 1388.68 498.33 0.17 -0.16 0.08 5979714.84 583808.15 N 70.35453086 W 149.31942910
3152.16 49.11 23.20 2534.08 2612.78 -518.43 1503.45 1412.73 508.66 0.67 0.63 -0.29 5979739.01 583818.21 N 70.35459658 W 149.31934517
3266.50 47.43 25.10 2610.19 2688.89 -541.75 1588.77 1490.59 543.55 1.92 -1.47 1.66 5979817.25 583852.23 N 70.35480928 W 149.31906183
3325.61 49.36 23.06 2649.43 2728.13 -553.88 1632.97 1530.95 561.57 4.16 3.27 -3.45 5979857.79 583869.80 N 70.35491951 W 149.31891549
3420.36 50.09 23.79 2710.69 2789.39 -574.50 1705.25 1597.27 590.31 0.97 0.77 0.77 5979924.43 583897.80 N 70.35510071 W 149.31868208
3515.35 49.54 23.70 2771.98 2850.68 -594.82 1777. 82 1663.70 619.53 0.58 -0.58 -0.09 5979991.17 583926.28 N 70.35528217 W 149.31844476
3609.16 49.34 23.32 2832.98 2911.68 -615.05 1849.09 1729.05 647.96 0.37 -0.21 -0.41 5980056.83 583953.98 N 70.35546071 W 149.31821387
3701.35 50.03 21.52 2892.63 2971.33 -636.28 1919.38 1794.03 674.77 1.67 0.75 -1.95 5980122.09 583980.05 N 70.35563821 W 149.31799618
3794.96 50.31 21.39 2952.59 3031.29 -659.14 1991.27 1860.94 701.06 0.32 0.30 -0.14 5980189.28 584005.60 N 70.35582099 W 149.31778262
3888.81 50.23 21.33 3012.57 3091.27 -682.21 2063.45 1928.16 727.35 0.10 -0.09 -0.06 5980256.78 584031.14 N 70.35600462 W 149.31756910
3982.46 49.83 20.65 3072.73 3151.43 -705.59 2135.22 1995.16 753.06 0.70 -0.43 -0.73 5980324.07 584056.10 N 70.35618767 W 149.31736028
4076.83 49.57 20.57 3133.77 3212.47 -729.49 2207.19 2062.53 778.39 0.28 -0.28 -0.08 5980391.70 584080.68 N 70.35637170 W 149.31715449
4172.21 49.68 19.90 3195.56 3274.26 -754.06 2279.86 2130.71 803.52 0.55 0.12 -0.70 5980460.15 584105.05 N 70.35655795 W 149.31695036
4266.06 48.39 21.00 3257.08 3335.78 -777.78 2350.72 2197.11 828.28 1.63 -1.37 1.17 5980526.82 584129.06 N 70.35673934 W 149.31674930
4360.01 47.90 21.14 3319.77 3398.47 -800.48 2420.70 2262.41 853.43 0.53 -0.52 0.15 5980592.38 584153.49 N 70.35691772 W 149.31654495
4454.28 47.80 22.75 3383.03 3461.73 -822.14 2490.59 2327.23 879.55 1.27 -0.11 1.71 5980657.49 584178.88 N 70.35709480 W 149.31633280
4548.11 48.18 26.94 3445.85 3524.55 -840.35 2560.29 2390.47 908.84 3.34 0.40 4.47 5980721.04 584207.46 N 70.35726755 W 149.31609491
4641.89 48.96 31.87 3507.92 3586.62 -853.25 2630.58 2451.68 943.36 4.03 0.83 5.26 5980782.62 584241.29 N 70.35743475 W 149.31581454
4735.40 48.79 36.31 3569.44 3648.14 -860.51 2701.01 2509.98 982.82 3.58 -0.18 4.75 5980841.36 584280.10 N 70.35759404 W 149.31549403
4829.57 48.97 40.88 3631.39 3710.09 -862.24 2771.93 2565.40 1027.05 3.66 0.19 4.85 5980897.26 584323.71 N 70.35774541 W 149.31513475
4923.41 48.83 47.15 3693.11 3771.81 -857.30 2842.62 2616.21 1076.14 5.04 -0.15 6.68 5980948.61 584372.22 N 70.35788420 W 149.31473606
SurveyEditor Ver 3.1 RT -SP3.03-HF4.00 Bld( d031 rt-546 )
N-U\L-201 \L-201 L3PB 1 \L-201 L3PB 1
Generated 5/5/2004 1 :36 PM Page 1 of 3
) )
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/1 00 ft ) (ftUS) (ftUS)
5016.44 49.09 54.19 3754.24 3832.94 -844.31 2912.75 2660.62 1130.36 5.71 0,28 7.57 5980993.62 584425.94 N 70.35800551 W 149.31429571
5110.60 48.23 58.33 3816.45 3895.15 -824.54 2983.43 2699.89 1189.11 3.42 -0.91 4.40 5981033.53 584484.25 N 70.35811275 W 149.31381851
5204.87 49.16 62.86 3878.69 3957.39 -799.63 3054.23 2734.62 1250.78 3.74 0.99 4.81 5981068.94 584545.52 N 70.35820761 W 149.31331763
5298.92 47.75 68.46 3941.09 4019.79 -769.20 3124.59 2763.65 1314.85 4.70 -1.50 5.95 5981098.67 584609.26 N 70.35828687 W 149.31279728
5392.93 49.39 73.49 4003.32 4082.02 -732.92 3195.05 2786.57 1381.46 4.37 1.74 5.35 5981122.34 584675.60 N 70.35834947 W 149.31225633
5487.16 51.11 80.03 4063.61 4142.31 -689.56 3267.47 2803.10 1451.92 5.64 1.83 6.94 5981139.64 584745.86 N 70.35839458 W 149.31168408
5582.88 53.94 84.88 4121.86 4200.56 -638.27 3343.41 2813.00 1527.19 4.99 2.96 5.07 5981150.39 584821.01 N 70.35842161 W 149.31107280
5677.97 56.15 89.22 4176.36 4255.06 -581.23 3421.33 2816.97 1604.99 4.40 2.32 4.56 5981155.22 584898.75 N 70.35843241 W 149.31044097
5769.98 58.26 91.53 4226.20 4304.90 -521.65 3498.66 2816.45 1682.32 3.12 2.29 2.51 5981155.56 584976.08 N 70.35843093 W 149.30981296
5862.16 59.02 94.81 4274.18 4352.88 -458.65 3577.37 2812.09 1760.89 3.15 0.82 3.56 5981152.07 585054.69 N 70.35841896 W 149.30917484
5955.46 61.37 98.97 4320.56 4399.26 -390.85 3658.32 2802.35 1841.23 4.62 2.52 4.46 5981143.22 585135.12 N 70.35839229 W 149.30852243
6025.00 63.75 101.66 4352.61 4431.31 -337.24 3720.02 2791.28 1901.93 4.85 3.42 3.87 5981132.83 585195.94 N 70.35836203 W 149.30802947
6037.00 65.61 102.17 4357.74 4436.44 -327.67 3730.87 2789.04 1912.55 15.97 15.50 4.25 5981130.71 585206.58 N 70.35835590 W 149.30794329
6067.17 69.45 102.59 4369.27 4447.97 -302.97 3758.75 2783.06 1939.77 12.79 12.73 1.39 5981125.04 585233.87 N 70.35833955 W 149.30772220
6098.49 73.46 103.02 4379.23 4457.93 -276.56 3788.43 2776.48 1968.72 12.87 12.80 1.37 5981118.78 585262.88 N 70.35832155 W 149.30748711
6129.29 77.29 1 03.45 4387.01 4465.71 -249.96 3818.23 2769.66 1997.73 12.51 12.44 1.40 5981112.28 585291.96 N 70.35830289 W 149.30725157
6160.61 80.90 103.88 4392.93 4471.63 -222.40 3848.98 2762.40 2027.60 11.60 11.53 1.37 5981105.35 585321.91 N 70.35828302 W 149.30700894
6191.13 83.52 104.30 4397.07 4475.77 -195.20 3879.21 2755.03 2056.93 8.69 8.58 1.38 5981098.32 585351.32 N 70.35826289 W 149.30677080
6223.02 83.49 104.20 4400.67 4479.37 -166.66 3910.90 2747.24 2087.64 0.33 -0.09 -0.31 5981090.86 585382.11 N 70.35824156 W 149.30652142
6254.04 85.41 106.75 4403.68 4482.38 -138.58 3941.77 2739.00 2117.39 10.26 6.19 8.22 5981082.95 585411.95 N 70.35821903 W 149.30627983
6284.62 89.47 108.79 4405.04 4483.74 -110.31 3972.32 2729.68 2146.48 14.85 13.28 6.67 5981073.96 585441.13 N 70.35819354 W 149.30604365
6315.35 93.21 111.40 4404.32 4483.02 -81.43 4003.03 2719.12 2175.32 14.84 12.17 8.49 5981063.73 585470.09 N 70.35816469 W 149.30580943
6347.35 95.13 111.33 4402.00 4480.70 -51.19 4034.95 2707.50 2205.04 6.00 6.00 -0.22 5981052.43 585499.93 N 70.35813291 W 149.30556810
6378.38 95.10 112.78 4399.23 4477.93 -21.78 4065.85 2695.89 2233.68 4.66 -0.10 4.67 5981041.15 585528.70 N 70.35810118 W 149.30533551
6409.80 95.11 113.80 4396.43 4475.13 8.19 4097.15 2683.52 2262.43 3.23 0.03 3.25 5981029.10 585557.58 N 70.35806735 W 149.30510210
6441 .44 95.58 115.26 4393.49 4472.19 38.55 4128.65 2670.44 2291.09 4.83 1.49 4.61 5981016.34 585586.38 N 70.35803160 W 149.30486940
6472.14 94.42 115.42 4390.81 4469.51 68.14 4159.23 2657.35 2318.73 3.81 -3.78 0.52 5981003.56 585614.16 N 70.35799582 W 149.30464497
6503.35 95.03 116.94 4388.24 4466.94 98.34 4190.34 2643.63 2346.64 5.23 1.95 4.87 5980990.15 585642.22 N 70.35795831 W 149.30441833
6534.97 95.27 120.06 4385.40 4464.10 129.20 4221.83 2628.60 2374.31 9.86 0.76 9.87 5980975.43 585670.06 N 70.35791724 W 149.30419364
6565.63 95.17 121.20 4382.61 4461.31 159.32 4252.36 2613.05 2400.58 3.72 -0.33 3.72 5980960.17 585696.50 N 70.35787472 W 149.30398033
6597.06 95.27 122.26 4379.75 4458.45 190.29 4283.66 2596.59 2427.21 3.37 0.32 3.37 5980944.01 585723.30 N 70.35782973 W 149.30376418
6627.98 95.24 122.20 4376.92 4455.62 220.80 4314.45 2580.17 2453.25 0.22 -0.10 -0.19 5980927.88 585749.52 N 70.35778484 W 149.30355271
6658.52 94.72 120.34 4374.27 4452.97 250.87 4344.88 2564.37 2479.26 6.30 -1.70 -6.09 5980912.38 585775.70 N 70.35774168 W 149.30334158
6689.96 92.73 117.86 4372.22 4450.92 281.68 4376.25 2549.12 2506.67 10.10 -6.33 -7.89 5980897.43 585803.27 N 70.35769998 W 149.30311902
6722.28 92.11 118.28 4370.86 4449.56 313.27 4408.54 2533.92 2535.16 2.32 -1.92 1.30 5980882.56 585831.93 N 70.35765844 W 149.30288768
6753.12 92.49 119.35 4369.62 4448.32 343.50 4439.35 2519.07 2562.16 3.68 1.23 3.47 5980868.01 585859.09 N 70.35761784 W 149.30266847
6784.35 92.52 119.42 4368.26 4446.96 374.16 4470.55 2503.76 2589.34 0.24 0.10 0.22 5980853.00 585886.44 N 70.35757599 W 149.30244774
6816.02 92.73 119.54 4366.81 4445.51 405.27 4502.19 2488.19 2616.88 0.76 0.66 0.38 5980837.74 585914.15 N 70.35753343 W 149.30222413
6846.65 92.38 118.96 4365.44 4444.14 435.33 4532.79 2473.24 2643.58 2.21 -1.14 -1.89 5980823.09 585941,01 N 70.35749256 W 149.30200736
6877.53 90.50 121.42 4364.67 4443.37 465.75 4563.66 2457.72 2670.26 10.02 -6.09 7.97 5980807.87 585967.86 N 70.35745013 W 149.30179075
6909.80 90.26 121.06 4364.45 4443.15 497.64 4595.93 2440.99 2697.85 1.34 -0.74 -1.12 5980791.44 585995.63 N 70.35740438 W 149.30156674
6940.05 90.57 118.38 4364.23 4442.93 527.40 4626.18 2425.99 2724.12 8.92 1.02 -8.86 5980776.74 586022.06 N 70.35736339 W 149.30135348
6971.84 90.02 120.46 4364.07 4442.77 558.65 4657.97 2410.38 2751.81 6.77 -1.73 6.54 5980761.44 586049.92 N 70.35732071 W 149.30112867
7002.09 91.29 119.49 4363.72 4442.42 588.43 4688.21 2395.26 2778.01 5.28 4.20 -3.21 5980746.62 586076.28 N 70.35727940 W 149.30091594
7032.71 89.74 120.63 4363.45 4442.15 618.59 4718.83 2379.93 2804.51 6.28 -5.06 3.72 5980731.58 586102.95 N 70.35723747 W 149.30070080
7064.12 89.37 119.22 4363.69 4442.39 649.51 4750.24 2364.26 2831.73 4.64 -1.18 -4.49 5980716.22 586130.34 N 70.35719464 W 149.30047979
7095.24 89.43 119.61 4364.02 4442.72 680.10 4781.36 2348.98 2858,84 1.27 0.19 1.25 5980701.24 586157.61 N 70.35715286 W 149.30025972
7127.33 90.09 120.48 4364.15 4442.85 711.71 4813.45 2332.91 2886.61 3.40 2.06 2.71 5980685.48 586185.56 N 70.35710894 W 149.30003420
7156.37 90.46 120.75 4364.01 4442.71 740.36 4842.49 2318.12 2911.61 1.58 1.27 0.93 5980670.97 586210.72 N 70.35706851 W 149.29983129
7188.49 89.06 122.08 4364.15 4442.85 772.12 4874.61 2301.38 2939.02 6.01 -4.36 4.14 5980654.54 586238.31 N 70.35702274 W 149.29960876
7219.01 88.78 121.55 4364.72 4443.42 802.32 4905.12 2285.29 2964.95 1.96 -0.92 -1.74 5980638.74 586264.41 N 70.35697877 W 149.29939825
7250.14 89.06 122.40 4365.31 4444.01 833.14 4936.25 2268.81 2991.35 2.87 0.90 2.73 5980622.56 586290.99 N 70.35693371 W 149.29918390
7282.07 88.75 121.85 4365.92 4444.62 864.76 4968.17 2251.83 3018.38 1.98 -0.97 -1.72 5980605.88 586318.22 N 70.35688731 W 149.29896441
7312.23 88.54 124.48 4366.63 4445.33 894.70 4998.32 2235.34 3043.62 8.75 -0.70 8.72 5980589.67 586343.63 N 70.35684222 W 149.29875952
7343.68 88.72 121.62 4367.38 4446.08 925.91 5029.76 2218.20 3069.97 9.11 0.57 -9.09 5980572.82 586370.17 N 70.35679535 W 149.29854559
7373.72 88.75 123.81 4368.05 4446.75 955.69 5059.80 2201.97 3095.24 7.29 0.10 7.29 5980556.88 586395.61 N 70.35675098 W 149.29834047
7405.43 90.40 121.45 4368.28 4446.98 987.14 5091.50 2184.87 3121.94 9.08 5.20 -7.44 5980540.08 586422.50 N 70.35670425 W 149.29812369
7436.75 90.53 123.10 4368.03 4446.73 1018.17 5122.82 2168.15 3148.42 5.28 0.42 5.27 5980523.66 586449.16 N 70.35665853 W 149.29790873
7468.41 90.57 121.71 4367.72 4446.42 1049.55 5154.48 2151.18 3175.15 4.39 0.13 -4.39 5980506.99 586476.07 N 70.35661215 W 149.29769174
7499.57 89.95 122.55 4367.58 4446.28 1080.42 5185.64 2134.61 3201.54 3.35 -1.99 2.70 5980490.71 586502.64 N 70.35656685 W 149.29747753
7531.47 89.54 119.47 4367.73 4446.43 1111.92 5217.54 2118.18 3228.87 9.74 -1.29 -9.66 5980474.59 586530.16 N 70.35652193 W 149.29725560
7561.83 88.89 118.27 4368.14 4446.84 1141.71 5247.90 2103.52 3255.46 4.49 -2.14 -3.95 5980460.23 586556.90 N 70.35648185 W 149.29703978
7590.92 88.61 119.15 4368.78 4447.48 1170.23 5276.98 2089.55 3280.96 3.17 -0.96 3.03 5980446.54 586582.56 N 70.35644366 W 149.29683270
7623.38 88.58 118.53 4369.57 4448.27 1202.06 5309.43 2073.90 3309.39 1.91 -0.09 -1.91 5980431.21 586611.15 N 70.35640086 W 149.29660193
7652.38 89.02 116.24 4370.18 4448.88 1230.36 5338.42 2060.56 3335.13 8.04 1.52 -7.90 5980418.16 586637.04 N 70.35636440 W 149.29639294
7683.48 89.09 116,61 4370.69 4449.39 1260.58 5369.52 2046.72 3362.98 1.21 0.23 1.19 5980404.64 586665.04 N 70.35632656 W 149.29616687
7714.85 88.47 116.22 4371.36 4450.06 1291.07 5400.88 2032.77 3391.07 2.33 -1.98 -1.24 5980391.00 586693.28 N 70.35628841 W 149.29593883
7745.61 88.44 116.39 4372.19 4450.89 1320.94 5431.63 2019.14 3418.63 0.56 -0.10 0.55 5980377.68 586720.99 N 70.35625115 W 149.29571505
7774.09 87.68 116.91 4373.15 4451.85 1348.64 5460.10 2006.38 3444.07 3.23 -2.67 1.83 5980365.20 586746.56 N 70.35621624 W 149.29550852
7806.71 87.58 118.22 4374.50 4453.20 1380.46 5492.69 1991.30 3472.96 4.02 -0.31 4.02 5980350.44 586775.62 N 70.35617500 W 149.29527397
7837.79 88.23 119.57 4375.64 4454.34 1410.94 5523.75 1976.29 3500.15 4.82 2.09 4.34 5980335.74 586802.97 N 70.35613397 W 149.29505322
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
N-U\L-201\L-201 L3PB1\L-201 L3PB1
Generated 5/5/2004 1 :36 PM Page 2 of 3
) )
Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft) (ft ) (ft) ( deg/1 00 ft ) (deg/100 ft) (deg/100 ft) (ftUS) (!tUS)
7867.60 88.27 119.45 4376.55 4455.25 1440.24 5553.54 1961.61 3526.08 0.42 0.13 -0.40 5980321.35 586829.06 N 70.35609384 W 149.29484271
7898.39 88.37 116.56 4377.45 4456.15 1470.34 5584.32 1947.16 3553.26 9.39 0.32 -9.39 5980307.21 586856.39 N 70.35605433 W 149.29462214
7928.76 87.99 116.47 4378.42 4457.12 1499.86 5614.67 1933.61 3580.42 1.29 -1.25 -0.30 5980293.96 586883.70 N 70.35601727 W 149.29440164
7959.52 88.20 116.29 4379.44 4458.14 1529.74 5645.42 1919.95 3607.96 0.90 0.68 -0.59 5980280.61 586911.39 N 70.35597992 W 149.29417805
7990.53 87.85 116.56 4380.51 4459.21 1559.86 5676.41 1906.16 3635.71 1.43 -1.13 0.87 5980267.13 586939.29 N 70.35594220 W 149.29395274
8020.99 87.31 117.62 4381.79 4460.49 1589.52 5706.84 1892.30 3662.81 3.90 -1.77 3.48 5980253.57 586966.53 N 70.35590431 W 149.29373279
8051.50 87.93 116.47 4383.06 4461.76 1619.23 5737.33 1878.44 3689.96 4.28 2.03 -3.77 5980240.02 586993.83 N 70.35586641 W 149.29351238
8082.17 88.20 118.70 4384.10 4462.80 1649.17 5767.98 1864.25 3717.12 7.32 0.88 7.27 5980226.13 587021.15 N 70.35582760 W 149.29329185
8112.99 87.96 120.34 4385.13 4463.83 1679.45 5798.78 1849.07 3743.92 5.37 -0.78 5.32 5980211.25 587048.12 N 70.35578610 W 149.29307426
8143.89 87.65 120.51 4386.31 4465.01 1709.90 5829.66 1833.43 3770.55 1.14 -1.00 0.55 5980195.91 587074.92 N 70.35574334 W 149.29285813
8173.86 87.00 122.75 4387.71 4466.41 1739.52 5859.59 1817.73 3796.04 7.77 -2.17 7.47 5980180.50 587100.58 N 70.35570042 W 149.29265123
8205.63 87.17 125.08 4389.33 4468.03 1771.06 5891.32 1800.03 3822.37 7.34 0.54 7.33 5980163.09 587127.10 N 70.35565202 W 149.29243751
8235.82 86.82 125.40 4390.91 4469.61 1801.11 5921.47 1782.64 3846.99 1.57 -1.16 1.06 5980145.97 587151.91 N 70.35560446 W 149.29223763
8266.75 86.65 126.22 4392.67 4471.37 1831.91 5952.35 1764.57 3872.03 2.70 -0.55 2.65 5980128.19 587177.15 N 70.35555507 W 149.29203437
8297.62 87.00 129.37 4394.38 4473.08 1862.70 5983.17 1745.68 3896.39 10.25 1.13 10.20 5980109.57 587201.71 N 70.35550344 W 149.29183670
8328.73 87.10 129.44 4395.98 4474.68 1893.77 6014.24 1725.96 3920.39 0.39 0.32 0.23 5980090.12 587225.93 N 70.35544952 W 149.29164185
8360.17 87.89 131.46 4397.36 4476.06 1925.18 6045.65 1705.58 3944.29 6.89 2.51 6.43 5980070.01 587250.05 N 70.35539382 W 149.29144787
8390.77 88.17 134.05 4398.41 4477.11 1955.72 6076.23 1684.82 3966.75 8.51 0.92 8.46 5980049.51 587272.73 N 70.35533708 W 149.29126564
8421.23 88.13 133.80 4399.39 4478.09 1986.09 6106.68 1663.70 3988.67 0.83 -0.13 -0.82 5980028.63 587294.89 N 70.35527935 W 149.29108768
8452.92 89.19 135.82 4400.13 4478.83 2017.66 6138.36 1641.38 4011.15 7.20 3.34 6.37 5980006.56 587317.61 N 70.35521832 W 149.29090529
8484.40 91.87 138.37 4399.84 4478.54 2048.89 6169.84 1618.32 4032.57 11.75 8.51 8.10 5979983.75 587339.29 N 70.35515531 W 149.29073141
8515.24 92.14 139.39 4398.76 4477.46 2079.34 6200.66 1595.11 4052.84 3.42 0.88 3.31 5979960.76 587359.82 N 70.35509185 W 149.29056693
8546.65 92.76 139.43 4397.42 4476.12 2110.30 6232.04 1571.28 4073.26 1.98 1.97 0.13 5979937.16 587380.50 N 70.35502672 W 149.29040125
8577.42 95.97 142.15 4395.08 4473.78 2140.43 6262.71 1547.51 4092.65 13.66 10.43 8.84 5979913.61 587400.15 N 70.35496176 W 149.29024389
8608.76 96.89 142.46 4391.57 4470.27 2170.86 6293.86 1522.87 4111.70 3.10 2.94 0.99 5979889.19 587419.46 N 70.35489441 W 149.29008938
8640.22 95.00 145.32 4388.31 4467.01 2201.23 6325.15 1497.59 4130.13 10.86 -6.01 9.09 5979864.12 587438.18 N 70.35482533 W 149.28993979
8671.29 93.62 145.93 4385.98 4464.68 2231.07 6356.13 1472.02 4147.62 4.85 -4.44 1.96 5979838.75 587455.95 N 70.35475545 W 149.28979788
8702.65 92.70 146.68 4384.25 4462.95 2261.12 6387.44 1445.97 4165.00 3.78 -2.93 2.39 5979812.89 587473.61 N 70.35468425 W 149.28965695
8734.01 93.31 148.37 4382.60 4461.30 2290.98 6418.76 1419.55 4181.81 5.72 1.95 5.39 5979786.67 587490.71 N 70.35461206 W 149.28952054
8765.12 95.45 151.83 4380.23 4458.93 2320.11 6449.77 1392.67 4197.27 13.05 6.88 11.12 5979759.96 587506.47 N 70.35453859 W 149.28939513
8796.21 96.76 154.07 4376.92 4455.62 2348.57 6480.69 1365.14 4211.33 8.31 4.21 7.20 5979732.59 587520.83 N 70.35446336 W 149.28928111
8827.99 96.93 157.87 4373.13 4451.83 2376.93 6512.24 1336.32 4224.18 11.88 0.53 11.96 5979703.92 587534.00 N 70.35438462 W 149.28917693
8860.31 96.96 160.73 4369.22 4447.92 2404.91 6544.32 1306.31 4235.51 8.78 0.09 8.85 5979674.05 587545.67 N 70.35430263 W 149.28908500
8890.83 96.41 163.65 4365.67 4444.37 2430.56 6574.63 1277.46 4244.78 9.67 -1.80 9.57 5979645.30 587555.26 N 70.35422378 W 149.28900987
8922.36 95.59 165.07 4362.37 4441.07 2456.44 6605.99 1247.26 4253.24 5.18 -2.60 4.50 5979615.20 587564.05 N 70.35414127 W 149.28894137
8954.40 94.93 168.79 4359.43 4438.13 2481.94 6637.90 1216.19 4260.45 11.74 -2.06 11.61 5979584.21 587571.60 N 70.35405637 W 149.28888295
8983.77 94.65 173.09 4356.98 4435.68 2504.05 6667.16 1187.29 4265.06 14.62 -0.95 14.64 5979555.37 587576.53 N 70.35397743 W 149.28884567
9014.46 94.03 17 4.23 4354.66 4433.36 2526.18 6697.77 1156.88 4268.44 4.22 -2.02 3.71 5979525.00 587580.25 N 70.35389433 W 149.28881838
9046.55 92.07 177.20 4352.95 4431.65 2548.55 6729.81 1124.93 4270.83 11.08 -6.11 9.26 5979493.08 587583.00 N 70.35380705 W 149.28879909
9076.61 95.51 176.43 4350.96 4429.66 2569.08 6759.80 1094.99 4272.50 11.73 11.44 -2.56 5979463.16 587585.00 N 70.35372524 W 149.28878571
9109.05 98.76 175.95 4346.93 4425.63 2591.36 6791.98 1062.87 4274.63 10.13 10.02 -1.48 5979431.08 587587.49 N 70.35363751 W 149.28876849
9140.76 99.26 175.43 4341.97 4420.67 2613.24 6823.30 1031.64 4276.99 2.26 1.58 -1.64 5979399.88 587590.19 N 70.35355219 W 149.28874953
9233.69 99.42 176.43 4326.89 4405.59 2677.01 6915.00 940.18 4283.50 1.08 0.17 1.08 5979308.50 587597.71 N 70.35330230 W 149.28869711
9326.06 99.54 175.60 4311.67 4390.37 2740.28 7006.11 849.29 4289.83 0.90 0.13 -0.90 5979217.70 587605.06 N 70.35305400 W 149.28864613
9378.00 99.54 175.60 4303.06 4381.76 2776.12 7057.33 798.22 4293.76 0.00 0.00 0.00 5979166.68 587609.55 N 70.35291447 W 149.28861446
LSQal Description:
NorthlnQ (V) [ftUSl EastlnQ (X) [ftUS]
Surface: 2597 FSL 3588 FEL S34 T12N R11E UM 5978320.84 583325.34
BHL: 3394 FSL 4573 FEL S35 T12N R11 E UM 5979166.68 587609.55
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
N-U\L-201\L-201 L3PB1\L-201 L3PB1
Generated 5/5/2004 1 :36 PM Page 3 of 3
TREE = FMC4-1/6" 5M
Wa.LH:AD = FMC G8\I 5
A crUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
DatumTVD =
)
78.70'
51.93'
300'
94 @ 12711:,
6137'
4400' SS
120" CON[XJcrOR H
110-314" CSG. 45.5#, L-80, ID = 9.95" H
3197'
Minimum ID = 3.813" @ 2266'
4-112" HES X NIPPLE
IRA TAGH 6179'
17-5/8" X 5-1/2" BKR ZXP A<R ID = 5.75" H 6173'
IBKR HlX3I-ES HOOK HGR, ID = 5.64" l-t 6224'
1 RA TAG H 6324'
17-5I8"X5-1/2"BKRZXPPKR,ID=5.75" H 6319'
I BKR HlX3HES I-OOK H3R ID = 5.64" H 6367
ÆRFORA TON SUMv1ARY
REF LOG:
ANGLE AT TOP PERF: xx @ xxxx'
Nola: ~fer to Production DB for histoncal perf data
SIZE SFF INlERJ AL Opn/Sqz DATE
4-1/2" SLTD OA 6090 - 9802 0 04/24/04
4-1/2" SlTD OBa 6295 - 13405 0 04/18104
4-1/2" SLTD OBb 6434 - 13465 0 04/09104
4-1/2" SLTD OBd 7028 - 13628 0 04/04/04
l7-5/8" CSG, 29.7#, L-80, ID = 6.875" H 7047'
~ 13672'
Dð.1E REV BY COMM:NTS
05104104 'rWA/KA~ ORIGINAL COMPLETION
r:)
I SAr-cTY NOTES:
L-20 1
L-201 L 1
L-201 L2
L-201 L3
~
114' I
I--¡;
~
::¡
~
~
z
~
DATE REV BY
I
7 -518" WINDOW @ 6025'
6020' - 9846' 6-3/4"OALATERAl, ID = 3.958"
fVi~. 6200' H4-1/2" BKR SEAL ASS8v1BL Y 1
~_ __ __6__2~_~_ __ __~_5__-1__/2~_' ~_~_1 ~_ '~_XJO' ID = 3.960"1
7-5/8" WINOOW @ 6229'
~
6224' -13448' 6-3/4" OBa LATERAL, ID = 3.958"
~ 6346' H4-1/2" BKRSEALASSEIVBLY 1
r ~ 6353' H5-1/Z' X4-1f2" XO, ID =3.960"1
... ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~J 7 -&8" wroow @ 6372
6367'-13506' 6-3/4"OBb LATERAL, ID = 3.958"
:g---i
I
1
H 7-5/8" X 5-1/2" BKR ZXP LNR TOP PKR, ID = 4.840"
H 4-1/2" BKR SEAL ASSEMBLY 1
H5-1/2" X 4-1/2" XO, ID= 3.980" 1
I 2266' H4-1f2" ÆSX NP.ID =3.813" I
.. GAS LIFT MAN[RELS
ST MD TVD ŒV TYÆ VLV LATCH FORT DATE
4 2370 2101 46 KBG-2 DMY BK-5 0 04/23/04
L 3 3525 2857 50 KBG-2 DMY BK-5 0 04/23/04
2 4680 3612 49 KBG-2 DMY BK-5 0 04/23/04
14-1f2" A-tOENIX DSCt-RGE-PRESS SUB,ID = 3.85"H 5814' ~ I I 11 55872°85' 42H72 57 KBG-2 D0<2 BEK 04/213/04
4-1/2" BKR CM) SLlaNG SLV, ID = 3.812"
14-11.1" RiŒND( JET RJMPSENSOR. ID = 3ß3õ' H 5849' I :g- ~ :::: ~:~:.: :~:;.: ~~:~. ID = 3.875" I
IRA TAGH 5975' ~ ~ -~ 5963' H4-112"HESXNIP.ID=3.813" I
17-5/8" X5-1f2" BKRZXPA<R, ID =5.75" H 5982' ~ -fd 6000' H4-1/2" BKRSEAL ASSErveLY 1
I 6001' H 5-1/2" X 4-1/2" XO, ID = 3.960" 1
IBKRHJGHESHOOKHGR,ID =5.64" H 6020' ~¡ .,., ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~J
6432'
6476'
6481 '
r 6922' H RA TAG I
6432'-13672' 6-3/4"OBd LATERAL,ID = 3.958"
COM~S
O~N UI\IT
wa.L: L-201, L-201 L 1, L-201 L2. L-201 L3
ÆRMrr No: 204046 (047) (048) (049)
AA No: 5~029-23202-00 (60) (61) (62)
SEC 34, T12N, R11 E, 2598' NSL & 3588' wa.
BP Exploration (Alaska)
\
,
SCRLUMBERGER
Survey report
Client... ...... ...... ....: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . . .: Orion
Well. . . . . . . . . . . . . . . . . . . . .: L-201 L3
API number...............: 50-029-23202-62
Engineer............. ....: Mark St. Amour
RIG Label:.. ........... ..: NABORS 9ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS......... ..: Mason & Taylor
----- Depth reference -----------------------
Permanent datum....... ...: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.. .., ..: 50.20 ft
KB above permanent... ....: N/A (Top Drive)
DF above permanent..... ..: 78.70 ft
----- Vertical section origin----------------
Latitude (+N/S-). ........: 0.00 ft
Departure (+E/W-)...... ..: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-)....... ..: -999.25 ft
Departure (+E/W-)..... ...: -999.25 ft
Azimuth from rotary table to target: 130.00 degrees
26-Apr-2004 14:08:03
Spud date... . . . . . . . . . . . . . :
Last survey date.........:
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
Page
1 of 8
17-March-2004
26-Apr-04
189
0.00 ft
9860.00 ft
----- Geomagnetic data ----------------------
Magnetic model.... .......: BGGM version 2003
Magnetic date..... .......: 20-Apr-2004
Magnetic field strength..: 1151.26 RCNT
Magnetic dec (+E/W-).....: 24.99 degrees
Magnetic dip. ............: 80.82 degrees
----- MWD survey Reference
Reference G.. ......... ...:
Reference R. ..... ........:
Reference Dip.......... ..:
Tolerance of G...........:
Tolerance of R.. .........:
Tolerance of Dip.........:
Criteria ---------
1002.68 mGal
1151.26 RCNT
80.82 degrees
(+/-) 2.50 mGal
(+/-) 6.00 RCNT
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 24.99 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 24.99 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
Æ ß '1 - 0 '"'I ~
c
e
~.
"
c
"
"-
\.
X
"
e
SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 2 of 8
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYRO None
3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYRO None
4 324.00 2.13 19.40 100.00 323.97 -1. 57 2.37 -0.05 2.38 358.72 1. 76 GYRO None
5 395.00 4.15 21.01 71.00 394.86 -2.87 6.02 1.31 6.16 12.25 2.85 GYRO None
6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYRO None e
7 595.00 8.86 11. 46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYRO None
8 695.00 11.87 12.48 100.00 691. 99 -20.13 44.33 10.92 45.65 13.83 3.02 GYRO None
9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG
10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21. 32 86.02 14.35 3.12 MWD GMAG
11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115.96 14.89 2.38 MWD GMAG
12 1040.82 22.84 16.89 93.36 1021. 28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG
13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG
14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG
15 1321.50 29.42 18.07 95.37 1272.00 -111.15 264.57 76.90 275.52 16.21 1. 53 MWD GMAG
16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91.86 323.53 16.49 1. 77 MWD GMAG
17 1511.08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1. 83 MWD GMAG
18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG
19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG
20 1797.56 36.27 18.62 98.02 1671.38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG
21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591.00 17.60 0.97 MWD GMAG e
22 1988.07 39.87 19.15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG
23 2081.93 41.57 20.11 93.86 1893.38 -267.74 677.09 218.63 711.51 17.90 1. 93 MWD GMAG
24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG
25 2269.96 45.03 20.88 94.18 2030.82 -311. 34 797.53 262.78 839.71 18.24 2.56 MWD GMAG
26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG
27 2458.33 47.95 21. 23 96.59 2161.62 -355.21 923.95 311.59 975.08 18.64 2.54 MWD GMAG
28 2552.24 48.94 21.51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG
29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG
30 2740.10 50.69 21. 63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG
SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 3 of 8
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 2834.26 50.10 21. 09 94.16 2405.24 -446.33 1190.40 416.22 1261.07 19.27 0.77 MWD GMAG
32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG
33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG
34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG
35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501. 52 19.80 0.67 MWD GMAG
36 3266.50 47.43 25.10 114.34 2688.89 -541. 75 1490.59 543.55 1586.61 20.03 1.92 MWD GMAG e
37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561.57 1630.69 20.14 4.16 MWD GMAG
38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG
39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG
40 3609.16 49.34 23.32 93.81 2911.68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG
41 3701.35 50.03 21. 52 92.19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1. 67 MWD GMAG
42 3794.96 50.31 21.39 93.61 3031.29 -659.14 1860.94 701.06 1988.61 20.64 0.32 MWD GMAG
43 3888.81 50.23 21. 33 93.85 3091.27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG
44 3982.46 49.83 20.65 93.65 3151. 43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG
45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG
46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277.18 20.66 0.55 MWD GMAG
47 4266.06 48.39 21. 00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG
48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG
49 4454.28 47.80 22.75 94.27 3461.74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG
50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG
51 4641.89 48.96 31. 87 93.78 3586.62 -853.25 2451.68 943.36 2626.91 21.05 4.03 MWD GMAG e
52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21. 38 3.58 MWD GMAG
53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21. 82 3.66 MWD GMAG
54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG
55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG
56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG
57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG
58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG
59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG
60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451.92 3156.80 27.38 5.64 MWD GMAG
SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 4 of 8
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG
62 5677.97 56.15 89.22 95.09 4255.06 -581.22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG
63 5769.98 58.26 91. 53 92.01 4304.90 -521.65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG
64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG
65 5955.46 61.37 98.97 93.30 4399.26 -390.85 2802.35 1841. 23 3353.10 33.31 4.62 MWD GMAG
66 6025.00 63.75 101. 66 69.54 4431. 31 -337.23 2791.28 1901. 93 3377.66 34.27 4.85 TOP OF WINDOW e
67 6037.00 65.61 102.17 12.00 4436.44 -327.67 2789.04 1912.55 3381.80 34.44 15.97 BOTTOM WINDOW
68 6067.17 69.45 102.59 30.17 4447.97 -302.97 2783.06 1939.77 3392.37 34.88 12.79 MWD Incl. Only
69 6098.49 73.46 103.02 31. 32 4457.93 -276.56 2776.48 1968.72 3403.63 35.34 12.87 MWD Incl. Only
70 6129.29 77.29 103.45 30.80 4465.71 -249.96 2769.66 1997.73 3414.96 35.80 12.51 MWD Incl. Only
71 6160.61 80.90 103.88 31. 32 4471.63 -222.40 2762.40 2027.60 3426.66 36.28 11.60 MWD Incl. Only
72 6191.13 83.52 104.30 30.52 4475.77 -195.20 2755.03 2056.93 3438.19 36.75 8.69 MWD GMAG
73 6223.02 83.49 104.20 31.89 4479.38 -166.66 2747.24 2087.64 3450.44 37.23 0.33 MWD GMAG
74 6254.04 85.41 106.75 31.02 4482.38 -138.58 2739.00 2117.39 3462.00 37.71 10.26 MWD GMAG
75 6284.62 89.47 108.79 30.58 4483.74 -110.30 2729.68 2146.48 3472.53 38.18 14.85 MWD GMAG
76 6315.35 93.21 111.40 30.73 4483.02 -81. 43 2719.12 2175.32 3482.19 38.66 14.84 MWD GMAG
77 6347.35 95.13 111.33 32.00 4480.70 -51.19 2707.50 2205.04 3491.81 39.16 6.00 MWD GMAG
78 6378.38 95.10 112.78 31.03 4477.93 -21.78 2695.89 2233.68 3501.03 39.64 4.66 MWD GMAG
79 6409.80 95.11 113.80 31. 42 4475.13 8.19 2683.52 2262.43 3509.97 40.13 3.23 MWD GMAG
80 6441. 44 95.58 115.26 31. 64 4472.19 38.55 2670.44 2291. 09 3518.57 40.63 4.83 MWD GMAG
81 6472 .14 94.42 115.42 30.70 4469.51 68.14 2657.35 2318.73 3526.76 41.11 3.81 MWD GMAG e
82 6503.35 95.03 116.94 31. 21 4466.94 98.34 2643.63 2346.64 3534.90 41. 59 5.23 MWD GMAG
83 6534.97 95.27 120.06 31. 62 4464.10 129.20 2628.60 2374.31 3542.16 42.09 9.86 MWD GMAG
84 6565.63 95.17 121. 20 30.66 4461. 31 159.32 2613 .05 2400.59 3548.36 42.57 3.72 MWD GMAG
85 6597.06 95.27 122.26 31.43 4458.45 190.29 2596.59 2427.21 3554.38 43.07 3.37 MWD GMAG
86 6627.98 95.24 122.20 30.92 4455.62 220.80 2580.17 2453.25 3560.30 43.56 0.22 MWD GMAG
87 6658.52 94.72 120.34 30.54 4452.97 250.87 2564.37 2479.26 3566.89 44.03 6.30 MWD GMAG
88 6689.96 92.73 117.86 31.44 4450.93 281.68 2549.12 2506.67 3575.11 44.52 10.10 MWD GMAG
89 6722.28 92.11 118.28 32.32 4449.56 313.27 2533.92 2535.16 3584.38 45.01 2.32 MWD GMAG
90 6753.12 92 .49 119.35 30.84 4448.32 343.50 2519.07 2562.16 3593.10 45.49 3.68 MWD GMAG
SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 5 of 8
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
91 6784.35 92.52 119.42 31.23 4446.96 374.17 2503.76 2589.34 3601.88 45.96 0.24 MWD GMAG
92 6816.02 92.73 119.54 31. 67 4445.51 405.27 2488.19 2616.88 3610.98 46.44 0.76 MWD GMAG
93 6846.65 92.38 118.96 30.63 4444.14 435.33 2473.24 2643.58 3620.15 46.91 2.21 MWD GMAG
94 6877 . 53 90.50 121. 42 30.88 4443.37 465.75 2457.72 2670.26 3629.14 47.37 10.02 MWD GMAG
95 6909.80 90.26 121.06 32.27 4443.15 497.64 2440.99 2697.85 3638.24 47.86 1. 34 MWD GMAG
96 6940.05 90.57 118.38 30.25 4442.93 527.40 2425.99 2724.12 3647.77 48.31 8.92 MWD GMAG e
97 6971.84 90.02 120.46 31. 79 4442.77 558.65 2410.38 2751.81 3658.19 48.78 6.77 MWD GMAG
98 7002.09 91. 29 119.49 30.25 4442.42 588.43 2395.26 2778.01 3668.05 49.23 5.28 MWD GMAG
99 7032.71 89.74 120.63 30.62 4442.15 618.59 2379.93 2804.51 3678.22 49.68 6.28 MWD GMAG
100 7064.12 89.37 119.22 31.41 4442.39 649.52 2364.26 2831.73 3688.96 50.14 4.64 MWD GMAG
101 7095.24 89.43 119.61 31.12 4442.72 680.10 2348.98 2858.84 3700.09 50.59 1.27 MWD GMAG
102 7127.33 90.09 120.48 32.09 4442.85 711.71 2332.91 2886.61 3711.47 51.06 3.40 MWD GMAG
103 7156.37 90.46 120.75 29.04 4442.71 740.36 2318.12 2911.61 3721.71 51. 47 1.58 MWD GMAG
104 7188.49 89.06 122.08 32.12 4442.85 772.12 2301.38 2939.02 3732.85 51.94 6.01 MWD GMAG
105 7219.01 88.78 121.55 30.52 4443.42 802.32 2285.29 2964.95 3743.46 52.38 1. 96 MWD GMAG
106 7250.14 89.06 122.40 31.13 4444.01 833.14 2268.81 2991.35 3754.42 52.82 2.87 MWD GMAG
107 7282.07 88.75 121. 85 31.93 4444.62 864.77 2251. 83 3018.38 3765.82 53.28 1. 98 MWD GMAG
108 7312.23 88.54 124.48 30.16 4445.33 894.70 2235.34 3043.62 3776.29 53.71 8.75 MWD GMAG
109 7343.68 88.72 121.62 31. 45 4446.09 925.91 2218.20 3069.97 3787.50 54.15 9.11 MWD GMAG
110 7373.72 88.75 123.81 30.04 4446.75 955.70 2201. 97 3095.24 3798.57 54.57 7.29 MWD GMAG
111 7405.43 90.40 121. 45 31.71 4446.98 987.14 2184.87 3121. 94 3810.53 55.01 9.08 MWD GMAG -
112 7436.75 90.53 123.10 31. 32 4446.73 1018.17 2168.15 3148.42 3822.75 55.45 5.28 MWD GMAG
113 7468.41 90.57 121.71 31.66 4446.43 1049.55 2151.18 3175.15 3835.25 55.88 4.39 MWD GMAG
114 7499.57 89.95 122.55 31.16 4446.28 1080.42 2134.61 3201.54 3847.91 56.31 3.35 MWD GMAG
115 7531.47 89.54 119.47 31.90 4446.43 1111 . 92 2118.18 3228.87 3861. 64 56.73 9.74 MWD GMAG
116 7561.83 88.89 118.27 30.36 4446.84 1141.71 2103.52 3255.46 3875.92 57.13 4.49 MWD GMAG
117 7590.92 88.61 119.15 29.09 4447.48 1170.23 2089.55 3280.96 3889.85 57.51 3.17 MWD GMAG
118 7623.38 88.58 118.53 32.46 4448.27 1202.07 2073.90 3309.39 3905.52 57.93 1.91 MWD GMAG
119 7652.38 89.02 116.24 29.00 4448.88 1230.36 2060.56 3335.13 3920.33 58.29 8.04 MWD GMAG
120 7683.48 89.09 116.61 31.10 4449.39 1260.58 2046.72 3362.98 3936.84 58.68 1.21 MWD GMAG
SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 6 of 8
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
121 7714.85 88.47 116.22 31.37 4450.06 1291. 07 2032.77 3391.07 3953.67 59.06 2.33 MWD GMAG
122 7745.61 88.44 116.39 30.76 4450.89 1320.94 2019.14 3418.63 3970.39 59.43 0.56 MWD GMAG
123 7774.09 87.68 116.91 28.48 4451.86 1348.64 2006.38 3444.07 3985.87 59.78 3.23 MWD GMAG
124 7806.71 87.58 118.22 32.62 4453.20 1380.46 1991. 30 3472.96 4003.34 60.17 4.02 MWD GMAG
125 7837.79 88.23 119.57 31.08 4454.34 1410.94 1976.29 3500.15 4019.55 60.55 4.82 MWD GMAG
126 7867.60 88.27 119.45 29.81 4455.25 1440.24 1961.61 3526.09 4035.00 60.91 0.42 MWD GMAG e
127 7898.39 88.37 116.56 30.79 4456.15 1470.34 1947.16 3553.26 4051.80 61. 28 9.39 MWD GMAG
128 7928.76 87.99 116.47 30.37 4457.12 1499.86 1933.61 3580.42 4069.18 61.63 1.29 MWD GMAG
129 7959.52 88.20 116.29 30.76 4458.14 1529.74 1919.95 3607.96 4087.00 61.98 0.90 MWD GMAG
130 7990.53 87.85 116.56 31.01 4459.21 1559.86 1906.16 3635.71 4105.10 62.33 1.43 MWD GMAG
131 8020.99 87.31 11 7.62 30.46 4460.50 1589.53 1892.30 3662.81 4122.74 62.68 3.90 MWD GMAG
132 8051. 50 87.93 116.47 30.51 4461. 76 1619.23 1878.44 3689.96 4140.57 63.02 4.28 MWD GMAG
133 8082.17 88.20 118.70 30.67 4462.80 1649.17 1864.25 3717.12 4158.41 63.36 7.32 MWD GMAG
134 8112.99 87.96 120.34 30.82 4463.83 1679.45 1849.07 3743.93 4175.65 63.72 5.37 MWD GMAG
135 8143.89 87.65 120.51 30.90 4465.01 1709.90 1833.43 3770.55 4192.68 64.07 1.14 MWD GMAG
136 8173.86 87.00 122.75 29.97 4466.41 1739.52 1817.73 3796.04 4208.81 64.41 7.77 MWD GMAG
137 8205.63 87.17 125.08 31.77 4468.03 1771.07 1800.03 3822.37 4225.00 64.78 7.34 MWD GMAG
138 8235.82 86.82 125.40 30.19 4469.61 1801.11 1782.64 3846.99 4239.94 65.14 1. 57 MWD GMAG
139 8266.75 86.65 126.22 30.93 4471.37 1831. 91 1764.57 3872.03 4255.15 65.50 2.70 MWD GMAG
140 8297.62 87.00 129.37 30.87 4473.08 1862.70 1745.68 3896.39 4269.57 65.87 10.25 MWD GMAG
141 8328.73 87.10 129.44 31.11 4474.68 1893.77 1725.96 3920.39 4283.50 66.24 0.39 MWD GMAG e
142 8360.17 87.89 131. 46 31. 44 4476.06 1925.18 1705.58 3944.29 4297.26 66.62 6.89 MWD GMAG
143 8390.77 88.17 134.05 30.60 4477 .11 1955.72 1684.82 3966.75 4309.72 66.99 8.51 MWD GMAG
144 8421. 23 88.13 133.80 30.46 4478.09 1986.09 1663.70 3988.67 4321.74 67.36 0.83 MWD GMAG
145 8452.92 89.19 135.82 31. 69 4478.84 2017.66 1641.38 4011.15 4333.99 67.75 7.20 MWD GMAG
146 8484.40 91.87 138.37 31. 48 4478.54 2048.90 1618.32 4032.58 4345.19 68.13 11.75 MWD GMAG
147 8515.24 92.14 139.39 30.84 4477.47 2079.35 1595.10 4052.84 4355.45 68.52 3.42 MWD GMAG
148 8546.65 92.76 139.43 31. 41 4476.12 2110.30 1571. 27 4073.26 4365.82 68.91 1. 98 MWD GMAG
149 8577.42 95.97 142.15 30.77 4473.78 2140.44 1547.51 4092.65 4375.45 69.29 13.66 MWD GMAG
150 8608.76 96.89 142.46 31. 34 4470.27 2170.86 1522.87 4111.70 4384.65 69.68 3.10 MWD GMAG
SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 7 of 8
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
151 8640.22 95.00 145.32 31. 46 4467.01 2201.23 1497.59 4130.13 4393.27 70.07 10.86 MWD GMAG
152 8671.29 93.62 145.93 31. 07 4464.68 2231. 07 1472.02 4147.63 4401. 09 70.46 4.85 MWD GMAG
153 8702.65 92.70 146.68 31. 36 4462.95 2261.12 1445.97 4165.00 4408.86 70.85 3.78 MWD GMAG
154 8734.17 91.70 148.49 31. 52 4461.74 2291.15 1419.38 4181.88 4416.19 71. 25 6.56 MWD GMAG
155 8765.49 92.35 146.21 31.32 4460.63 2321. 02 1393.03 4198.76 4423.82 71. 65 7.57 MWD GMAG
156 8796.85 95.28 143.87 31. 36 4458.55 2351. 23 1367.39 4216.69 4432.86 72.03 11.95 MWD GMAG e
157 8827.80 95.21 143.54 30.95 4455.72 2381.18 1342.55 4234.93 4442.65 72.41 1. 09 MWD GMAG
158 8860.34 92.28 144.59 32.54 4453.59 2412.67 1316.26 4253.99 4452.97 72.81 9.56 MWD GMAG
159 8891. 06 91.15 148.72 30.72 4452.67 2442.08 1290.61 4270.86 4461. 61 73.19 13.93 MWD GMAG
160 8923.00 89.47 151. 00 31.94 4452.50 2472.12 1262.99 4286.90 4469.08 73.58' 8.87 MWD GMAG
161 8953.54 87.58 152.89 30.54 4453.28 2500.43 1236.05 4301.25 4475.33 73.97 8.75 MWD GMAG
162 8984.50 87.55 157.09 30.96 4454.60 2528.46 1208.03 4314.33 4480.26 74.36 13.55 MWD GMAG
163 9016.10 88.78 158.90 31. 60 4455.61 2556.35 1178.75 4326.16 4483.87 74.76 6.92 MWD GMAG
164 9046.88 87.48 162.73 30.78 4456.62 2582.76 1149.70 4336.27 4486.09 75.15 13 .13 MWD GMAG
165 9077.63 87.68 166.69 30.75 4457.92 2608.01 1120.07 4344.37 4486.44 75.54 12.88 MWD GMAG
166 9108.92 88.20 170.29 31. 29 4459.04 2632.49 1089.43 4350.61 4484.94 75.94 11.62 MWD GMAG
167 9140.61 87.27 172.71 31. 69 4460.29 2656.20 1058.12 4355.29 4481.98 76.34 8.18 MWD GMAG
168 9171. 73 86.17 177.05 31.12 4462.07 2678.21 1027.18 4358.06 4477.48 76.74 14.36 MWD GMAG
169 9203.61 88.16 180.15 31.88 4463.65 2699.26 995.36 4358.84 4471.04 77.14 11.54 MWD GMAG
170 9234.10 90.33 182.00 30.49 4464.05 2718.42 964.88 4358.27 4463.80 77.52 9.35 MWD GMAG
171 9265.19 90.29 182.60 31.09 4463.89 2737.43 933.81 4357.02 4455.96 77.90 1. 93 MWD GMAG e
172 9296.32 90.57 182.48 31.13 4463.65 2756.36 902.71 4355.64 4448.20 78.29 0.98 MWD GMAG
173 9326.11 91.01 181. 28 29.79 4463.24 2774.75 872.94 4354.66 4441.30 78.66 4.29 MWD GMAG
174 9357.55 89.71 182.70 31. 44 4463.04 2794.11 841.52 4353.57 4434.16 79.06 6.12 MWD GMAG
175 9389.23 89.47 182.21 31. 68 4463.27 2813.41 809.87 4352.21 4426.92 79.46 1. 72 MWD GMAG
176 9421.98 89.88 182.34 32.75 4463.46 2833.45 777.15 4350.91 4419.77 79.87 1.31 MWD GMAG
177 9452.68 89.47 184.35 30.70 4463.63 2851.78 746.51 4349.12 4412.72 80.26 6.68 MWD GMAG
178 9483.53 90.63 183.01 30.85 4463.60 2870.05 715.72 4347.14 4405.67 80.65 5.74 MWD GMAG
179 9515.45 94.48 183.68 31.92 4462.18 2889.08 683.89 4345.28 4398.77 81. 06 12.24 MWD GMAG
180 9545.57 97.27 185.48 30.12 4459.10 2906.45 654.03 4342.89 4391.86 81.44 11. 01 MWD GMAG
..
SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 8 of 8
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
181 9576.71 96.82 185.55 31.14 4455.28 2923.94 623.27 4339.92 4384.45 81.83 1.46 MWD GMAG
182 9607.62 97.41 185.76 30.91 4451. 45 2941.25 592.75 4336.90 4377.22 82.22 2.02 MWD GMAG
183 9639.43 97.69 185.01 31.81 4447.27 2959.16 561.35 4333.94 4370.14 82.62 2.50 MWD GMAG
184 9669.37 97.17 185.92 29.94 4443.40 2975.99 531.80 4331.11 4363.64 83.00 3.48 MWD GMAG
185 9701. 64 97.76 183.22 32.27 4439.20 2994.54 499.91 4328.56 4357.33 83.41 8.50 MWD GMAG
186 9732.38 96.20 184.73 30.74 4435.47 3012.48 469.47 4326.45 4351. 84 83.81 7.04 MWD GMAG e
187 9762.92 95.65 184.87 30.54 4432.32 3029.99 439.20 4323.90 4346.15 84.20 1. 86 MWD GMAG
188 9809.89 96 .16 183.39 46.97 4427.48 3057.37 392.60 4320.54 4338.34 84.81 3.32 MWD GMAG
189 9860.00 96.16 183.39 50.11 4422.11 3087.08 342.87 4317.59 4331.19 85.46 0.00 Projected To TD
[(c)2004 IDEAL ID8_1C_01]
e
~ ~
SCHLUMBERGER
Survey report
Client.... ........ .......: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . . .: Orion
Well...... .... ....... ....: L-201 L3 PB1
API number.... ....... ....: 50-029-23202-73
Engineer. ...... ..........: Mark St. Amour
RIG Label:........... ....: NABORS 9ES
STATE:............... ....: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS........ ...: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 50.20 ft
KB above permanent.......: N/A (Top Drive)
DF above permanent.... ...: 78.70 ft
----- Vertical section origin----------------
Latitude (+N/S-).. ... ....: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).. .......: -999.25 ft
Departure (+E/W-). .......: -999.25 ft
Azimuth from rotary table to target: 130.00 degrees
25-Apr-2004 10:07:03
Spud date........ ... .....:
Last survey date..... ....:
Total accepted surveys...:
MD of first survey.. .....:
MD of last survey.... ....:
Page
1 of 7
17-March-2004
25-Apr-04
170
0.00 ft
9378.00 ft
e
----- Geomagnetic data ----------------------
Magnetic model..... ......: BGGM version 2003
Magnetic date...... ......: 20-Apr-2004
Magnetic field strength..: 1151.26 HCNT
Magnetic dec (+E/W-) .....: 24.99 degrees
Magnetic dip.. ..... ......: 80.82 degrees
----- MWD survey Reference
Reference G........ ......:
Reference H....... .......:
Reference Dip..... .......:
Tolerance of G.... ..... ..:
Tolerance of H........ ...:
Tolerance of Dip.. .......:
Criteria ---------
1002.68 mGal
1151.26 HCNT
80.82 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
<
\ ~
e
----- Corrections ---------------------------
Magnetic dec (+E/W-) .....: 24.99 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-) ....: 24.99 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
~ò~-6~1
SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 2 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYRO None
3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYRO None
4 324.00 2.13 19.40 100.00 323.97 -1. 57 2.37 -0.05 2.38 358.72 1. 76 GYRO None
5 395.00 4.15 21. 01 71.00 394.86 -2.87 6.02 1. 31 6.16 12.25 2.85 GYRO None
6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYRO None e
7 595.00 8.86 11. 46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYRO None
8 695.00 11.87 12.48 100.00 691. 99 -20.13 44.33 10.92 45.65 13.83 3.02 GYRO None
9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG
10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21.32 86.02 14.35 3.12 MWD GMAG
11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115.96 14.89 2.38 MWD GMAG
12 1040.82 22.84 16.89 93.36 1021. 28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG
13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG
14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG
15 1321. 50 29.42 18.07 95.37 1272.00 -111.15 264.57 76.90 275.52 16.21 1. 53 MWD GMAG
16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91. 86 323.53 16.49 1.77 MWD GMAG
17 1511.08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1. 83 MWD GMAG
18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG
19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG
20 1797.56 36.27 18.62 98.02 1671.38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG
21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591.00 17.60 0.97 MWD GMAG e
22 1988.07 39.87 19.15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG
23 2081.93 41.57 20.11 93.86 1893.38 -267.74 677.09 218.63 711. 51 17.90 1. 93 MWD GMAG
24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG
25 2269.96 45.03 20.88 94.18 2030.82 -311.34 797.53 262.78 839.71 18.24 2.56 MWD GMAG
26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG
27 2458.33 47.95 21. 23 96.59 2161.62 -355.21 923.95 311.59 975.08 18.64 2.54 MWD GMAG
28 2552.24 48.94 21. 51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG
29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG
30 2740.10 50.69 21.63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG
SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 3 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr
(ft) (deg) (de g) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 2834.26 50.10 21.09 94.16 2405.24 -446.33 1190.40 416.22 1261.07 19.27 0.77 MWD GMAG
32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG
33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG
34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG
35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501.52 19.80 0.67 MWD GMAG
36 3266.50 47.43 25.10 114.34 2688.89 -541.75 1490.59 543.55 1586.61 20.03 1. 92 MWD GMAG e
37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561.57 1630.69 20.14 4.16 MWD GMAG
38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG
39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG
40 3609.16 49.34 23.32 93.81 2911. 68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG
41 3701.35 50.03 21. 52 92.19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1.67 MWD GMAG
42 3794.96 50.31 21.39 93.61 3031. 29 -659.14 1860.94 701.06 1988.61 20.64 0.32 MWD GMAG
43 3888.81 50.23 21. 33 93.85 3091.27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG
44 3982.46 49.83 20.65 93.65 3151.43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG
45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG
46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277 .18 20.66 0.55 MWD GMAG
47 4266.06 48.39 21.00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG
48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG
49 4454.28 47.80 22.75 94.27 3461.74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG
50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG
51 4641. 89 48.96 31.87 93.78 3586.62 -853.25 2451. 68 943.36 2626.91 21.05 4.03 MWD GMAG e
52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21. 38 3.58 MWD GMAG
53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21.82 3.66 MWD GMAG
54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG
55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG
56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG
57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG
58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG
59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG
60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451.92 3156.80 27.38 5.64 MWD GMAG
SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 4 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG
62 5677.97 56.15 89.22 95.09 4255.06 -581. 22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG
63 5769.98 58.26 91.53 92.01 4304.90 -521.65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG
64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG
65 5955.46 61.37 98.97 93.30 4399.26 -390.85 2802.35 1841.23 3353.10 33.31 4.62 MWD GMAG
66 6025.00 63.75 101.66 69.54 4431.31 -337.23 2791.28 1901.93 3377.66 34.27 4.85 TOP OF WINDOW e
67 6037.00 65.61 102.17 12.00 4436.44 -327.67 2789.04 1912.55 3381.80 34.44 15.97 BOTTOM WINDOW
68 6067.17 69.45 102.59 30.17 4447.97 -302.97 2783.06 1939.77 3392.37 34.88 12.79 MWD Incl. Only
69 6098.49 73.46 103.02 31. 32 4457.93 -276.56 2776.48 1968.72 3403.63 35.34 12.87 MWD Incl. Only
70 6129.29 77.29 103.45 30.80 4465.71 -249.96 2769.66 1997.73 3414.96 35.80 12.51 MWD Incl. Only
71 6160.61 80.90 103.88 31. 32 4471.63 -222.40 2762.40 2027.60 3426.66 36.28 11.60 MWD Incl. Only
72 6191.13 83.52 104.30 30.52 4475.77 -195.20 2755.03 2056.93 3438.19 36.75 8.69 MWD GMAG
73 6223.02 83.49 104.20 31. 89 4479.38 -166.66 2747.24 2087.64 3450.44 37.23 0.33 MWD GMAG
74 6254.04 85.41 106.75 31. 02 4482.38 -138.58 2739.00 2117.39 3462.00 37.71 10.26 MWD GMAG
75 6284.62 89.47 108.79 30.58 4483.74 -110.30 2729.68 2146.48 3472.53 38.18 14.85 MWD GMAG
76 6315.35 93.21 111. 40 30.73 4483.02 -81. 43 2719.12 2175.32 3482.19 38.66 14.84 MWD GMAG
77 6347.35 95.13 111. 33 32.00 4480.70 -51.19 2707.50 2205.04 3491. 81 39.16 6.00 MWD GMAG
78 6378.38 95.10 112.78 31.03 4477.93 -21.78 2695.89 2233.68 3501.03 39.64 4.66 MWD GMAG
79 6409.80 95.11 113.80 31.42 4475.13 8.19 2683.52 2262.43 3509.97 40.13 3.23 MWD GMAG
80 6441. 44 95.58 115.26 31. 64 4472.19 38.55 2670.44 2291.09 3518.57 40.63 4.83 MWD GMAG
81 6472.14 94.42 115.42 30.70 4469.51 68.14 2657.35 2318.73 3526.76 41.11 3.81 MWD GMAG e
82 6503.35 95.03 116.94 31. 21 4466.94 98.34 2643.63 2346.64 3534.90 41. 59 5.23 MWD GMAG
83 6534.97 95.27 120.06 31. 62 4464.10 129.20 2628.60 2374.31 3542.16 42.09 9.86 MWD GMAG
84 6565.63 95.17 121. 20 30.66 4461.31 159.32 2613.05 2400.59 3548.36 42.57 3.72 MWD GMAG
85 6597.06 95.27 122.26 31. 43 4458.45 190.29 2596.59 2427.21 3554.38 43.07 3.37 MWD GMAG
86 6627.98 95.24 122.20 30.92 4455.62 220.80 2580.17 2453.25 3560.30 43.56 0.22 MWD GMAG
87 6658.52 94.72 120.34 30.54 4452.97 250.87 2564.37 2479.26 3566.89 44.03 6.30 MWD GMAG
88 6689.96 92.73 117.86 31. 44 4450.93 281.68 2549.12 2506.67 3575.11 44.52 10.10 MWD GMAG
89 6722.28 92.11 118.28 32.32 4449.56 313.27 2533.92 2535.16 3584.38 45.01 2.32 MWD GMAG
90 6753.12 92.49 119.35 30.84 4448.32 343.50 2519.07 2562.16 3593.10 45.49 3.68 MWD GMAG
SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 5 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
91 6784.35 92.52 119.42 31. 23 4446.96 374.17 2503.76 2589.34 3601.88 45.96 0.24 MWD GMAG
92 6816.02 92.73 119.54 31.67 4445.51 405.27 2488.19 2616.88 3610.98 46.44 0.76 MWD GMAG
93 6846.65 92 .38 118.96 30.63 4444.14 435.33 2473.24 2643.58 3620.15 46.91 2.21 MWD GMAG
94 6877.53 90.50 121.42 30.88 4443.37 465.75 2457.72 2670.26 3629.14 47.37 10.02 MWD GMAG
95 6909.80 90.26 121.06 32.27 4443.15 497.64 2440.99 2697.85 3638.24 47.86 1. 34 MWD GMAG
96 6940.05 90.57 118.38 30.25 4442.93 527.40 2425.99 2724.12 3647.77 48.31 8.92 MWD GMAG e
97 6971.84 90.02 120.46 31.79 4442.77 558.65 2410.38 2751.81 3658.19 48.78 6.77 MWD GMAG
98 7002.09 91. 29 119.49 30.25 4442.42 588.43 2395.26 2778.01 3668.05 49.23 5.28 MWD GMAG
99 7032.71 89.74 120.63 30.62 4442.15 618.59 2379.93 2804.51 3678.22 49.68 6.28 MWD GMAG
100 7064.12 89.37 119.22 31. 41 4442.39 649.52 2364.26 2831. 73 3688.96 50.14 4.64 MWD GMAG
101 7095.24 89.43 119.61 31.12 4442.72 680.10 2348.98 2858.84 3700.09 50.59 1.27 MWD GMAG
102 7127.33 90.09 120.48 32.09 4442.85 711.71 2332.91 2886.61 3711.47 51.06 3.40 MWD GMAG
103 7156.37 90.46 120.75 29.04 4442.71 740.36 2318.12 2911.61 3721.71 51. 47 1.58 MWD GMAG
104 7188.49 89.06 122.08 32.12 4442.85 772.12 2301.38 2939.02 3732.85 51.94 6.01 MWD GMAG
105 7219.01 88.78 121. 55 30.52 4443.42 802.32 2285.29 2964.95 3743.46 52.38 1. 96 MWD GMAG
106 7250.14 89.06 122.40 31.13 4444.01 833.14 2268.81 2991.35 3754.42 52.82 2.87 MWD GMAG
107 7282.07 88.75 121.85 31.93 4444.62 864.77 2251. 83 3018.38 3765.82 53.28 1. 98 MWD GMAG
108 7312.23 88.54 124.48 30.16 4445.33 894.70 2235.34 3043.62 3776.29 53.71 8.75 MWD GMAG
109 7343.68 88.72 121.62 31. 45 4446.09 925.91 2218.20 3069.97 3787.50 54.15 9.11 MWD GMAG
110 7373.72 88.75 123.81 30.04 4446.75 955.70 2201.97 3095.24 3798.57 54.57 7.29 MWD GMAG
111 7405.43 90.40 121.45 31.71 4446.98 987.14 2184.87 3121.94 3810.53 55.01 9.08 MWD GMAG e
112 7436.75 90.53 123.10 31. 32 4446.73 1018.17 2168.15 3148.42 3822.75 55.45 5.28 MWD GMAG
113 7468.41 90.57 121. 71 31. 66 4446.43 1049.55 2151.18 3175.15 3835.25 55.88 4.39 MWD GMAG
114 7499.57 89.95 122.55 31.16 4446.28 1080.42 2134.61 3201. 54 3847.91 56.31 3.35 MWD GMAG
115 7531.47 89.54 119.47 31.90 4446.43 1111. 92 2118.18 3228.87 3861. 64 56.73 9.74 MWD GMAG
116 7561.83 88.89 118.27 30.36 4446.84 1141.71 2103.52 3255.46 3875.92 57.13 4.49 MWD GMAG
117 7590.92 88.61 119.15 29.09 4447.48 1170.23 2089.55 3280.96 3889.85 57.51 3.17 MWD GMAG
118 7623.38 88.58 118.53 32.46 4448.27 1202.07 2073.90 3309.39 3905.52 57.93 1. 91 MWD GMAG
119 7652.38 89.02 116.24 29.00 4448.88 1230.36 2060.56 3335.13 3920.33 58.29 8.04 MWD GMAG
120 7683.48 89.09 116.61 31.10 4449.39 1260.58 2046.72 3362.98 3936.84 58.68 1.21 MWD GMAG
SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 6 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
121 7714.85 88.47 116.22 31.37 4450.06 1291.07 2032.77 3391.07 3953.67 59.06 2.33 MWD GMAG
122 7745.61 88.44 116.39 30.76 4450.89 1320.94 2019.14 3418.63 3970.39 59.43 0.56 MWD GMAG
123 7774.09 87.68 116.91 28.48 4451. 86 1348.64 2006.38 3444.07 3985.87 59.78 3.23 MWD GMAG
124 7806.71 87.58 118.22 32.62 4453.20 1380.46 1991.30 3472.96 4003.34 60.17 4.02 MWD GMAG
125 7837.79 88.23 119.57 31.08 4454.34 1410.94 1976.29 3500.15 4019.55 60.55 4.82 MWD GMAG
126 7867.60 88.27 119.45 29.81 4455.25 1440.24 1961.61 3526.09 4035.00 60.91 0.42 MWD GMAG e
127 7898.39 88.37 116.56 30.79 4456.15 1470.34 1947.16 3553.26 4051.80 61. 28 9.39 MWD GMAG
128 7928.76 87.99 116.47 30.37 4457.12 1499.86 1933.61 3580.42 4069.18 61.63 1. 29 MWD GMAG
129 7959.52 88.20 116.29 30.76 4458.14 1529.74 1919.95 3607.96 4087.00 61.98 0.90 MWD GMAG
130 7990.53 87.85 116.56 31. 01 4459.21 1559.86 1906.16 3635.71 4105.10 62.33 1.43 MWD GMAG
131 8020.99 87.31 117.62 30.46 4460.50 1589.53 1892.30 3662.81 4122.74 62.68 3.90 MWD GMAG
132 8051.50 87.93 116.47 30.51 4461. 76 1619.23 1878.44 3689.96 4140.57 63.02 4.28 MWD GMAG
133 8082.17 88.20 118.70 30.67 4462.80 1649.17 1864.25 3717.12 4158.41 63.36 7.32 MWD GMAG
134 8112.99 87.96 120.34 30.82 4463.83 1679.45 1849.07 3743.93 4175.65 63.72 5.37 MWD GMAG
135 8143.89 87.65 120.51 30.90 4465.01 1709.90 1833.43 3770.55 4192.68 64.07 1.14 MWD GMAG
136 8173.86 87.00 122.75 29.97 4466.41 1739.52 1817.73 3796.04 4208.81 64.41 7.77 MWD GMAG
137 8205.63 87.17 125.08 31.77 4468.03 1771.07 1800.03 3822.37 4225.00 64.78 7.34 MWD GMAG
138 8235.82 86.82 125.40 30.19 4469.61 1801.11 1782.64 3846.99 4239.94 65.14 1.57 MWD GMAG
139 8266.75 86.65 126.22 30.93 4471.37 1831.91 1764.57 3872.03 4255.15 65.50 2.70 MWD GMAG
140 8297.62 87.00 129.37 30.87 4473.08 1862.70 1745.68 3896.39 4269.57 65.87 10.25 MWD GMAG
141 8328.73 87.10 129.44 31.11 4474.68 1893.77 1725.96 3920.39 4283.50 66.24 0.39 MWD GMAG e
142 8360.17 87.89 131. 46 31. 44 4476.06 1925.18 1705.58 3944.29 4297.26 66.62 6.89 MWD GMAG
143 8390.77 88.17 134.05 30.60 4477.11 1955.72 1684.82 3966.75 4309.72 66.99 8.51 MWD GMAG
144 8421. 23 88.13 133.80 30.46 4478.09 1986.09 1663.70 3988.67 4321.74 67.36 0.83 MWD GMAG
145 8452.92 89.19 135.82 31. 69 4478.84 2017.66 1641.38 4011.15 4333.99 67.75 7.20 MWD GMAG
146 8484.40 91.87 138.37 31. 48 4478.54 2048.90 1618.32 4032.58 4345.19 68.13 11.75 MWD GMAG
147 8515.24 92.14 139.39 30.84 4477.47 2079.35 1595.10 4052.84 4355.45 68.52 3.42 MWD GMAG
148 8546.65 92.76 139.43 31. 41 4476.12 2110.30 1571. 27 4073.26 4365.82 68.91 1. 98 MWD GMAG
149 8577.42 95.97 142.15 30.77 4473.78 2140.44 1547.51 4092.65 4375.45 69.29 13.66 MWD GMAG
150 8608.76 96.89 142.46 31. 34 4470.27 2170.86 1522.87 4111. 70 4384.65 69.68 3.10 MWD GMAG
SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 7 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
151 8640.22 95.00 145.32 31. 46 4467.01 2201. 23 1497.59 4130.13 4393.27 70.07 10.86 MWD GMAG
152 8671.29 93.62 145.93 31. 07 4464.68 2231.07 1472.02 4147.63 4401.09 70.46 4.85 MWD GMAG
153 8702.65 92.70 146.68 31. 36 4462.95 2261.12 1445.97 4165.00 4408.86 70.85 3.78 MWD GMAG
154 8734.01 93.31 148.37 31. 36 4461.30 2290.99 1419.55 4181.81 4416.18 71.25 5.72 MWD GMAG
155 8765.12 95.45 151.83 31.11 4458.93 2320.11 1392.66 4197.27 4422.28 71.64 13.05 MWD GMAG
156 8796.21 96.76 154.07 31. 09 4455.62 2348.57 1365.14 4211.33 4427.06 72.04 8.31 MWD GMAG e
157 8827.99 96.93 157.87 31.78 4451. 83 2376.94 1336.32 4224.18 4430.51 72.45 11.88 MWD GMAG
158 8860.31 96.96 160.73 32.32 4447.92 2404.91 1306.31 4235.52 4432.39 72.86 8.78 MWD GMAG
159 8890.83 96.41 163.65 30.52 4444.37 2430.56 1277.46 4244.79 4432.84 73.25 9.67 MWD GMAG
160 8922.36 95.59 165.07 31.53 4441.07 2456.45 1247.26 4253.24 4432.35 73.66 5.18 MWD GMAG
161 8954.40 94.93 168.79 32.04 4438.14 2481.95 1216.19 4260.45 4430.64 74.07 11.74 MWD GMAG
162 8983.77 94.65 173.09 29.37 4435.68 2504.05 1187.29 4265.06 4427.23 74.44 14.62 MWD GMAG
163 9014.46 94.03 174.23 30.69 4433.36 2526.19 1156.88 4268.44 4422.44 74.84 4.22 MWD GMAG
164 9046.55 92.07 177.20 32.09 4431.65 2548.56 1124.93 4270.83 4416.50 75.24 11.08 MWD GMAG
165 9076.61 95.51 176.43 30.06 4429.67 2569.08 1094.99 4272.50 4410.58 75.63 11.73 MWD GMAG
166 9109.05 98.76 175.95 32.44 4425.64 2591.36 1062.87 4274.64 4404.79 76.04 10.13 MWD GMAG
167 9140.76 99.26 175.43 31.71 4420.67 2613.24 1031.64 4276.99 4399.65 76.44 2.26 MWD GMAG
168 9233.69 99.42 176.43 92.93 4405.59 2677.02 940.18 4283.50 4385.46 77.62 1. 08 MWD GMAG
169 9326.06 99.54 175.60 92.37 4390.37 2740.29 849.29 4289.83 4373.09 78.80 0.90 MWD GMAG
170 9378.00 99.54 175.60 51. 94 4381. 77 2776.13 798.22 4293.76 4367.32 79.47 0.00 Projected To TD
e
e
e
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason
Well No L-201 L3 Date Dispatched: 27-Apr-04
I nsta lIation/Rig Nabors 9ES Dispatched By: N.Rose
Data No Of Prints No of Floppies
Surveys
2
Received By:
":1/ / /¡I, I'.
/~- U~
7 /'1~1 t O'(J~
Please sign and return to:
Drilling & Measurements LWD Division
2525 Gambell Street, Suite 400
Anchorage, Alaska 99503
nrose1@slb.com
Fax: 907-561-8417
LWD Log DeliveryV1.1, 10-02-03
Schlumberger Private
R ò '"I - 0 '-{ 9
e
e
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason
Well No L-201 L3 PBl Date Dispatched: 12-Apr-04
Installation/Rig .1.1.1..1 Dispatched By: N. Rose
11.1 No Of Prints No of Floppies
Surveys
2
Received By:
JLv-J () IJ~
'/ r'\e-¡ Á~ V\
Please sign and return to:
Drilling & Measurements LWD Division
2525 Gambell Street, Suite 400
Anchorage, Alaska 99503
nrosel@slb.com
Fax: 907-561-8417
LWD Log DeliveryV1.1, 10-02-03
;( a vi'- (jl{q
Schlumberger Private
t! ~-
illJj
.
~ Œ\
~lA1
FRANK H. MURKOWSKI, GOVERNOR
AI,ASIiA. OIL Al'O) GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe L-201L3
BP Exploration (Alaska) Inc.
Permit No: 204-049
Surface Location: 2598' NSL, 3588' WEL, SEe. 34, TI2N, RIlE, UM
Bottomhole Location: 3090' NSL, 498' EWL, SEC. 35, Tl2N, RIlE, UM
Dear Mr. Crane:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you fTom obtaining additional permits or approvals
required by law fTom other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well PBU L-201, Permit Number 204-046,
API Number 50-029-23202. Production should continue to be reported as a function of the
original API number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field ins ector a 9-3607 (pager).
BY ORDER gF THE COMMISSION
DATED thisL day of March, 2004
ee: Department ofFish & Game, Habitat Section w/o enel.
Department of Environmental Conservation wlo enel.
W4A- -sift 'U)(¡¥
o Drill a Redrill
1a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM
Top of Productive Horizon:
5222' NSL, 1183' WEL, SEC. 34, T12N, R11E, UM (OA)
Total Depth:
3090' NSL, 498' EWL, SEC. 35, T12N, R11E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: X-583325 y-5978321 Zone-ASP4
16. Deviated Wells:
Kickoff Depth
C~sil'lgPr09r¡:¡m
Size
Casing
4-1/2"
ALA& OIL AND ~Ä~T~g~SAi~~ON'OMM\~~TO~
PERMIT TO DRILL MAR 04 2004
20 MC 25.005
1b. Current Well Class 0 Exploratory a De~,~!9Pw!iJ,[ttOil 0 Multiple Zone
o Stratigraphic Test 0 Service 0 Development Gas 0 Single Zone
5. Bond: IBI Blanket 0 Single Well 11. Well Name and Number:
Bond No. 2S100302630-277 PBU L-201L3
6. Proposed Depth: 12. Field I Pool(s):
MD 9668 TVD 4444 Prudhoe Bay Field I Orion
7. Property Designation:
ADL ADL 02823a..C 1
"'7'f"~
8. Land Use Permit:
13. Approximate Spud Date:
March 13, 2004
9. Acres in Property:
2560
14. Distance to Nearest Property:
5400'
6183 ft
10. KB Elevation Planned 15. Distance to Nearest Well Within Pool
(Height above GL): 78.7 feet L-119 is 350' away at top of OA
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle 97° Downhole: 2140 psig Surface: 1680 psig
SettjngQèpth
TOp ,,'Bottom
Grade Coupling Length MD TVD MD TVD (including stage data)
L-80 IBT 3729' 6170' 4456' 9668' 4444' Uncemented Slotted Liner
Hole
6-3/4"
Weight
12.6#
19. PRE$EN1"WELLCONDITION SùMMARY("fobeçornpletedfor R~rill AND Re-entry" Qper¡:¡tk)l')s)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD
13632 4763 None 13632 4763
Structural
Conductor 80'
Surface 3160'
Intermediate 7062
Production
Liner 6541'
Liner (OBb) 5668'
Liner (OBa) 5668'
48" 260 sx Arctic Set (Approx.) 109' 109'
10-3/4" 613 sx AS Lite, 360 sx Class 'G' 3189' 2639'
7-5/8" 578 sx Class 'G' 7091' 4686'
4-1/2" Uncemented Slotted Liner 7091' - 13632' 4686' - 4763'
4-1/2" Uncemented Slotted Liner 6513' - 13536' 4574' - 4657'
4-1/2" Uncemented Slotted Liner 6341' -13494' 4521' - 4636'
20. Attachments 0 Filing Fee, $100 0 BOP Sketch
IBI Property Plat 0 Diverter Sketch
perfOration Depth TVD (ft):
IBI Drilling Program 0 Time vs Depth Plot
o Seabed Report IBI Drilling Fluid Program
o Shallow Hazard Analysis
IBI 20 AAC 25.050 Requirements
Date:
Contact Michael Triolo, 564-5774
Perforation Depth MD (ft):
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Crane Title Senior Drilling Engineer
Phone
564-4089
Date
I See cover letter for
other requirements
DYes D No
~Yes D No
Permit To Drill API Number:
Number: .207'-(1 SIr 50- o~9- 2.32..0:2. - b..2.
Conditions of Approval: Samples Required DYes D No
Hydr n Sulfide Measures D Yes D No
o £-35"0 p~¡' ,
Permit
Date:
Mud Log
Directional Survey Required
BY ORDER OF
THE COMMISSION
Date~Z:
\ ~\Ll\ L
·
Well Plan Summary
wter Prudhoe Bay L-201 ML Permit
Suñace Location: 2,598' FSL, 3,588' FEL, Sec. 34, T12N, R11E
(As-staked) X = 583,325.34 Y = 5,978,320.84
1._ _ ~_r_._ "'~ ..__.._"~"¥._~__ ~ __w_______ H_'____~____'~~.--~----.<~.~"':_~:_::":'.:~_~:::.~._________.._~_._____................__~.~..""-....____..,~
L-201 OBd Target Start: 4,813' FSL, 545' FEL, Sec. 34, T12N, R11 E
X = 586,340.00 Y = 5,980,570.00 Z = 4,625' rvDss
1,562' FSL, 736' FEL, Sec. 35, T12N, R11E
.. -rr~-= 5~~,470.00X::::.?.'.~Z7J~~P·()º_.~.,==_<1.!§!!4' TVDss 'r~m
L-201 L 1 OBb Target Start: 5,067' FSL, 914' FEL, Sec. 34, T12N, R11 E
X = 585,967.46 Y = 5,980,820.14 Z = 4,504' TVDss
L-201 L 1 OBb Target End: 1,541' FSL, 696' FEL, Sec. 35, T12N, R11 E
X = 591,510.00 Y = 5,977,360.00 Z = 4,578' TVDss
L-201 L2 OBa Target Start: 4,823' FSL, 544' FEL, Sec. 34, T12N, R11 E
X = 586,340.00 Y = 5,980,580.00 Z = 4,465' rvDss
L-201 L2 OBa Target End: 1,550' FSL, 720' FEL, Sec. 35, T12N, R11 E
X = 591,486.00 Y = 5,9771369.00 Z = 41557' TVDss
1.-.__.__ .H'_.," ',r ._.~__" ¡¡ ~
L-201 L3 OA Target Start: 5,222' FSL, 1,184' FEL, Sec. 34, T12N, R11 E
X = 585,695.78 Y = 5,980,972.12 Z = 4,415' TVDss
3,090' FSL, 4,782' FEL, Sec. 35, T12N, R11E
X = 587,405.00 Y = 5,978,860.00 Z = 4,150' TVDss
I Type of Well (producer or injector):
L-201 OBd Target End:
L-201 L3 OA Target End:
I AFE Number:
I ORD5M3543
I Schrader OBd, OBb, OBa and OA Multilateral Producer I
_ ~;~;:~::JJ.m::~
·----·'11
i!
KBE = 78.70'
I Rig: I Nabors 9ES
I Estimated Start Date: I March 13m 2004 I I Operating days to complete: 146.86
OBd MD 13,632' Well TVDrkb: TD 4,763' Max Inc. 93° KOP 300'
OBb MD 13,536' Well TVDrkb: TD 4,657' Max Inc. 92° KOP 6,526'
OBa MD 13,494' Well TVDrkb: TD 4,636' Max Inc. 93° KOP 6,354'
OAMD 9,668' Well TVDrkb: TD 4,444' Max Inc. 97° KOP 6,183'
Target Estimates:
Estimated Reserves OA I OBa I OBb I OBd:
Expected Initial Rate OA I OBa I OBb IOBd:
Expected 12 Month avg OA I OBa I OBb I OBd:
Current Well Information
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Original Well API #:
L-201 L1 API OBb #:
L-201 L2 API OBa #:
L-201 L3 API OA #.
Well Type:
Current Status:
H2S:
Expected reserves 6.90 mmbbl
Production rate: 4,950 bId
Production rate: 2,300 bId
5,400' MD from top OA to PBU boundary (this is the closest point
in the producing well section to any unit boundary)
Top OA: 350' away from L -119 top OA
TD: 2,270' away from L-210
50-029-XXXXX -00
50-029-XXXXX -60
50-029-XXXXX-61
50-029-XXXXX-62
Schrader O-sand Quadlateral Producer
New well, 20" X 34" insulated conductor to be set
o ppm from produced fluids (approximated to be around 10 ppm due to
contaminated gas lift gas)
Final Permit 3/4/04
<eer Prudhoe Bay L-201 ML Permit
OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's
OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's
OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's
OBd: 2,140 psi @ 4,600' rvDss (8.90 ppg EMW). Based on L-120 MDT's
84 of @ 4,400' rvDss (Estimated)
.
BHP:
BHT:
Mechanical Condition
Conductor:
Cellar Box Height:
Nabor 9ES:
20" X 34", 215.51blft, A53 ERW set at 109' RKB
Above MSL = 50.20'
KB I MSL = 78.70'
Materials Needed
3,190'
1 each
25 each
1 assembly
1 lot
1 each
10-%",45.5#, L-80 BTC Casing (Burst: 5,210; Collapse: 2,470)
10-%", BTC Float Shoe and Float Collar
10-%" x 13-~" Bow Spring Centralizers
FMC 11" 5m Gen 5 Wellhead System
10-%" casing pups 5', 10', 20'.
1 0-%" TAM Port Collar
7,091'
1 each
75 each
20 each
2 lots
3 each
2 each
7-%" 29.7# L-80 BTC-M Casing (Burst: 6,890; Collapse: 4,790)
7-%" BTC-M Float Shoe and Float Collar
7-%" x 9-}'a" Rigid Straight Blade Centralizers
7-%" Stop Rings
7-%" casing pups 5',10',20'
7-%" RA Tag
7-%" 29.7# L-80 BTC-M Casing Short Joint
4 x Production Liners:
24,300
607 each
4 each
4 each
3 assemblies
. "....---.<~,
4 ~", 12.6#, L-80, IBT-Mod Slotted Liner
4~" x 5 %" x 8" Straight Blade Centralizers
7-%" x 4-~" Baker ZXP Liner Top Packer
4-Y2" Halliburton Float Shoes
Baker Level 3 Hookwall Hangers with LEM
6,150'
1 each
1 each
1 each
1 each
2 each
1 each
4 each
1 each
6,150'
3 each
1 each
Surface and Anti-Collision Issues
4-Y2", 12.6Ib/ft, L-80, BTC-M tubing
Baker PRM Production Packer 7-%" X 4-Y2"
11" X 4-~" FMC tubing hanger
4-1/16", 5m Cameron Tree
Halliburton XN-Nipple (3.725" ID)
Halliburton X-Nipple (3.813" ID)
4-~" Baker CMD Sliding Sleeve
Camco 4-~" X 1" KBG-2 Gas Lift Mandrels
Phoenix pressure gauge
I-wire for the Phoenix gauge
Half-muleshoed joint of 4-Y2" IBT-M tubing
4-~" WLEG
~urface Shut-in Wells: L-119 will need to be shut-in for the rig move on and off L-201.
~Iose Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile.
2
final Permit 3/4/04
. .ter Prudhoe Bay L-201 ML Permit
Closerءproach Well List:
aw' ,~~~",~,..~....~
L-21 0 30.13-ft 249.39-ft 26.01-ft Use Traveling Cylinder (Gyro)
L-120 47.06-ft 299.58-ft 42.05-ft Use Traveling Cylinder (Gyro)
L-103 30.23-ft 449.73-ft 23.14-ft Use Traveling Cylinder (Gyro)
L-119 17.33-ft 549.94-ft 8.43-ft Use Traveling Cylinder (Gyro)
Mud Program
13-~" Suñace Hole Mud Properties: I Spud - Freshwater Mud
Interval I Density (ppg) Funnel vis YP Tauo ~H Plastic Vis
0-1,700 8.6-9.2 250-300 50-70 10-18 8.5-9.0 20-45
1,700-2,500 9.0-9.5 200-250 30-45 8-16 8.5-9.0 20-40
2,500 - 3,190 9.3 - 9.5 200 30 - 40 9 -14 8.5 - 9.0 14 -20
Interval S cific Maintain Viscosity greater then 250
Ob' f pe . Ensure fluid loss below permafrost is below 6
$~V." l~te~~~;~~le Mu1d Properti~~~ 'M' "",.,..,~.w~.!,i~ta~n. ~~>tJ;:~:::~;~~~~~:~~; PH: 9~Ò': 9.5
Interval I Density (ppg) Funnel vis I YP I Tauo I PV I API Filtrate I MBT
9.0 - 9.3 45 - 55 26 - 30 3 - 6 12 - 18 4 - 6 < 20
Maintain proper fluid rheology & lubricant concentration to achieve the directional
requirements
Optimize mud rheology to maximize ROP while maintaining an ECD <0.7 ppg over
calculated clean hole.
Reduce shaker blinding while drilling the UGNU.
6-*" Production Hole Mud Properties: I LVT-2oo MOBM (Versa-Pro)
Interval I Density (ppg) Stability I YP I Oil : H20 Ratio I PV I API Filtrate I MBT
9.2 650-900 18-25 80:20 15-20 4-5.5 <6
Minimize solids/liquid invasion by maintaining optimum PSD of bridging agents.
Maintain minimal ECD's by reducing drill solids accumulation through utilization of
the rigs solids control system and effective dilution.
FL
NC-8
8
5.5-8
Interval Specific
Objectives:
Interval Specific
Objectives:
Well Control
Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will
be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below,
BOP equipment will be tested to 3,500 psi.
Diverter, BOPE and drilling fluid system schematics are on file with the AOGCC.
Production Section-
· Maximum anticipated BHP: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Actual from L-120 MDT's
· Maximum suñace pressure: 1,680 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
3,500 psi (7-%" casing will be tested to 3,500 psi)
Estimated 9.2 ppg Brine /6.8 ppg Diesel
:,....[ø:a};' :. t!
l~fði.Y~JliL ~~~~..~~.
5,000 psi Working Pressure 3,500/250 psi Rams & Valves
(entire stack and valves 3,500/250 psi Annular
Disposal
· NO ANNULAR INJECTION ON THIS WELL.
.. No annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any
metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all
Class I waste to Pad 3 for disposal.
3
Final Permit 3/4/04
·
_ter Prudhoe Bay L-201 ML Permit
Formation Markers
~~-~~
SV4
Base Permafrost
SV3
SV2
SV1
UG4
UG4A
UG3
UG1
Ma
Mb1
Mb2
Me
Na
Nb
Ne
OA
OBa
OBb
OBc
OBd
TO (OBd)
.' ~ > s:
II I ~~JJIi ..._ J'"
.ø~""'l:;r:tfij~1i1[.l"
1,475 1617 675 8.8 No
1,600 1766 730 8.8 No
1,680 1866 770 8.8 No
1,960 2245 890 8.7 Poss. Gas Hydr.
2,130 2509 960 8.7 Poss. Gas Hydr.
2,460 3031 1,120 8.8 Poss. Gas Hydr.
2,750 3490 1,255 8.8 Yes - Heavy Oil
2,785 3546 1,270 8.8 Yes - Heavy Oil
3,150 4123 1,420 8.7 Yes - Heavy Oil
3,500 4672 1,600 8.8 Yes - Heavy Oil
3,960 5379 1,820 8.8 Yes - Heavy Oil
4,000 5444 1,825 8.8 No - Wtr
4,080 5578 1,830 8.6 No - Wtr
4,155 5710 1,845 8.5 No - Wtr
4,200 5793
4,230 5850 1,890 8.6 No - Wtr
4,275 5940
4,370 6151 1,970 8.7 Yes
4,440 6226 2,000 8.7 Yes
4,490 6494 2,060 8.8 Yes
4,545 6734 2,110 8.9 Yes
4,600 7051 2,140 8.9 Yes
4,684 13,632 2,168 8.9 Yes
CasinglTubing Program
48" 20" X 34" 215.5# A53 Welded 80' 29' 129' 109'/109'
13-~" 10-%" 45.5# L-80 STC 3,160' 29' 129' 3,189' 12,639'
9-%" 7-%" 29.7# L-80 STC-M 7,062' 29' 129' 7,091'/4,686'
6-%" OSd 4-~" slotted 12.6# L-80 1ST 6,541' 7,091' 14,686' 13,632' 14,763'
6_3..4" OSb 4-~" slotted 12.6# L-80 1ST 5,668' 6,513' 14,574' 13,536' 1 4,657'
6-%" OSa 4-~" slotted 12.6# L-80 1ST 5,668' 6,341' 1 4,521 ' 13,494' 14,636'
6-%" OA 4-~" slotted 12.6# L-80 1ST 3,729' 6,170' 1 4,456' 9,668' 1 4,444'
Tubing 4-~" 12.6# L-80 IST-M 6,121' 29' 129' 6,150' 1 4,454'
Cement Calculations
Casing Size 110-% -in 45.5-lblft L-80 STC surface casing
Basis 250% excess in permafrost. 30% excess below permafrost. Top of tail cement 800' MD above shoe
Total Cement Vol: Wash 20-bbl CW Spacer
Spacer 70-bbI10.1-lb/gal MudPush spacer
Lead 468-bbl, 613-sx 10.7-lb/gal ASL - 4.28 ft~/sx
(cement to suñaee)
Tail 75-bbl, 360-sx 15.8-lb/gal Premium G - 1.17 ft~/sx
""~_':"Æ~~'~"'!~'>i<-jt~~.fe"2!~,!,~",~~.:,.~!".~_~~.~~,,,~~,*~',;I~'·"~"";:;:;JS;W,;;;;)!I"_~~~'."~,w._~%~<¡_'0;i>!"_,,,£>~,,,:~~,",.#,_,,;c'N¡£..'#'~''Ä.~M:,,~.::'~::~f./'~'''¡i::.=:=-~w'1:ø_>;!W:<r:t'''.W~~~_:
Temp I SHST == 55°F from SOR, SHCT 60°F estimated by Dowell
In the event that cement is not circulated to suñace during the initial suñace casing cement job, notify the
AOGCC of the upcoming remedial cement work for possible witness of cement to suñace.
4 Final Permit 3/4/04
· .er Prudhoe Bay L-201 ML Permit
Casing Size 17-% -in 29.7-lblft L-80 BTC-M intermediate casing
Basis Top of tail cement 700-ft MD above top of Schrader Ma-sand. 30% excess over gauge.
Total Cement Vol: Wash 25-bbl Water
Spacer 45-bbI10.3-lb/gal MudPush Spacer
Tail 124 bbl, 578-sx 15.8-lb/gal Premium -1.20 ft;1/SX
__"._ ~0.f..?f ~~~.!!~-I?L!~£~~: 5,~~~' MD_'"M'''
Temp BHST = 120°F from SOR, BHCT 90°F estimated by Halliburton
: Wf on _I'-^-
1Q-3A" Casing Centralizer Placement
a) Run (25) 9-%" Bow-spring centralizers attached over the collar of each joint of casing from the casing
shoe up to 2,189' MD (1,00' MD above the shoe).
b) This centralizer program is subject to change pending actual hole conditions.
7-o/a" Casing Space Out
a) Space 7-%" casing out with pups and long/short jOints as required to place the top of a long full joint - 5-
15' above the top of the OBb, OBa and OA sands to allow for the window to be milled just below the top
of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance
reservoir contact depending on the angle of intersection of each zone.
b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth
except on the OBd lateral. It will need to be placed 120' above the casing shoe.
c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out.
7-o/a" String Centralizer Placement
a) Centralizer size: 7-%" X 9-%" (this is different then the norm of W under gauge hole)
b) Do not run centralizers on the window joints spaced at the top of each sand.
c) Place 2 rigid straight blade centralizers back to back at the very bottom of the shoe joint. Do not run any
centralizers on the next two full joints.
d) With the exception stated above, alternate 1 rigid straight vane cenralizer floating across a full joint and
2 rigid straight vane centralizers, one floating on the upper half of the joint and one floating on the lower
half of the joint separated by a stop collar up to ±5,830' MD (320' MD above the top OA sand). Then
continue with 1 rigid straight vane centralizer per joint floating to 4,600' MD (780' MD above Ma sand).
Zonal isolation with cement is required between the OA and the Nb sands due to the presence of water
in the Nb sand. The centralizer program is subject to change pending modeling and hole conditions.
4 "'h" Solid Liner Centralizer Placement
a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking
is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop
collar. Do not put any centralization on the first two joints above the bent joint.
Survey and Logging Program
13-"'h" Hole Section: Surface Gyro if needed (have discussion with ODE on photo or E-line Gyro)
Open Hole Drilling: MWD I GR
Cased hole: None
·~---··~tYSJ ~ ¡~*~~¥'t¡--"*,*,'.~~~~~~;~~>!!o:-~,~r1&:t¡;¡x~¡¡~ J!19IJl9 m'~~ $~~~'AA'!#.?lm.¡.ì$ Ii nJ "< i?'< ¡¡::i~ã'(}~
9-%" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only)
Open Hole: None
_10' 1 ~~~,~d ,~o~;~~,,~,~~ ~W~~~"¡~~ii~,~~l'~~Jj~,~~t~~i~~~~!~~~~~"'~__".,, ""~
6-~" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (Den/Neu recorded only) I AIM I PWD
Cased Hole: None
5
Final Permit 3/4/04
· Wer Prudhoe Bay L-201 ML Permit
Drillina Hazards and Continaencies
POST THIS NOTICE IN THE DOGHOUSE
J. Well Control
A. The Schrader in this fault block is expected to be underpressured based on the MDT samples.
a. OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's
b. OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's
c. OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's
d. OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's
II. Hydrates and Shallow gas
A. Gas hydrates are present below L-pad, but have not been a significant issue thus far during L-Pad drilling. If
hydrates are encountered follow the recommended practice and apply good drilling operational practices.
III. Lost Circulation/Breathing
A. lost circulation is unlikely within the Schrader interval.
B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee.
IV. Kick Tolerancellntegrity Testing
A. The 10-%" casing will be cemented to surface.
B. The 7_%" casing will be cemented with 15.81b/gal tail cement to 700' MD above the Ma sand -4,680' MD.
C. The Kick Tolerance for the surface casing is 52.7 bbls with 9.2 ppg mud, 11.4 ppg lOT, and an 8.9 ppg pore
pressure (most likely 8.9 ppg based on recent MDT's within the block). If the LOT is less then 11.4 ppg EMW,
then the kick tolerance will be < 50 bbls.
D. The Kick Tolerance for the production hole laterals is infinite with 9.2 ppg mud, 12.0 ppg FIT, and an 8.9 ppg pore
pressure. If the FIT is less then 12.0 ppg EMW notify the ODE to have conversation on how to deal with
potential ECD concerns around the casing exit points.
E. Integrity Testing
V.
10-%-in Window
7-%-in Shoe
7-% -in Window
7-% -in Window
7-% -in Window
¡'.T W-~l.IIiwT
~_,~~~_~ ~_o .-, ' -..
20-ft min new formation below shoe
20-ft min new formation below shoe
20-ft minimum from top window
20-ft minimum from top window
20-ft minimum from top window
.*~~.~~
LOT 11.4 minimum
FIT 12.0 minimum
FIT 12.0 minimum
FIT 12.0 minimum
FIT 12.0 minimum
Stuck Pipe
A. We do not expect stuck pipe.
B. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners
moving as much as possible and run one centralizer per joint to help with standoff.
VI. Hydrogen Sulfide
A. l-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be
followed at all times. Recently 10 ppm of H2S has been measured at L-Pad from all wells tested as recently as
January 2003 with hand held H2S meters. This is as a result of H2S being transmitted by shared gas lift gas and
not produced from L-Pad. There has been no seawater injection at l-Pad to date.
VII. Faults
There are four visible faults to cross while drilling the well. It is possible to encounter sub-seismic faults along the
proposed well path. In the production hole sections, if a fault throws us out of section steer up as fast as possible
to determine where we are within the section. This will make it easy to lowside OH sidetrack to get back on
course.
Fault #1 :
Fault #2
SV6
UG1
1,090' MD
5,190' MD
1,000' TVDss
3,840' TVDss
80' West throw
40' Southwest throw
CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
6
Final Permit 3/4/04
· .ter Prudhoe Bay L-201 ML Permit
Drill and Complete Procedure Summary
Pre-Rie Work:
1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5
Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and
production simops.
Drillina Ria Operations:
1. MIRU Nabors 9ES Nipple up diverter spool and riser. Function test diverter. PU 4,200' of 5" DP as required and stand
back in derrick (this will enable both holes to be drilled without changing the DP handling equipment in open hole).
2. MU 13-¥.z" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,189' MD 12,639' TVD.
The actual surface hole TD will be +1-100' TVD below the top of the SV1 sand.
3. Run and cement the 10-%",45.5# L-80 surface casing back to surface. Will use TAM collar as contingency only.
ND drilling spool and riser and NU casing 1 tubing head. NU BOPE and test to 3,500 psi.
4. MU 9-%" directional drilling assembly with MWD/GRlReslDen/NeuIPWD and a Weatherford Drill-Mill at ±BOO' from the
bit in the HWDP section and RIH PU 4" DP to float collar. Test the 10-%" casing to 3,500 psi for 30 minutes.
5. Drill out shoe track. Circulate and condition mud. Displace well to new LSND drilling fluid. Drill 20' of new formation
below rathole and perform a LOT. Directionally drill ahead to TD (Topset the OBd) as per directional profile to 7,091'
MD 14,686' TVD.
6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TD. Make sure hole is clean
prior to POOH. POOH laying down the 5" DP and standing back the 4" DP, LD drilling BHA. Retrieve bowl protector.
7. MU and run 7-%" 29.7# L-80 BTC-M long string casing to TD. Cement in one stage to 700' MD above the Schrader
Ma sand. Bump plug with seawater. Land casing on mandrel hanger.
8. Clean pits for displacement. Freeze protect 7-%" x 10-%" annulus with dead crude to 2,200' TVD.
9. PU 6-%" Powerdrive RSS or conventional assembly with MWD/GRlResl Azimuthal Den INeulPWD and RIH to the
float collar picking up 4" DP on the way. Test the 7-%" casing to 3,500 psi for 30 minutes.
10. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new
formation below rathole and perform an FIT to 12.0 ppg EMW. Directionally drill ahead to TD geosteering through the
OBd to TD at 13,632' MD 14,763' TVD (prognosed). Perform wiper trip, circulate and condition mud.
11. POOH to near OBb window depth, log into top OBb and OBb RA marker with GR, log across the OBa and OA
windows as well. POH LD drilling assembly.
12. MU and run 4-¥.z" 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TD. Position liner top packer 100'
below OBb window.
13. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is
near the top of the OBb sand (planned window exit: 6,501' MD). Orient whipstock to highside. Shear off Whipstock &
mill window. Perform FIT to 12 ppg EMW. POOH
14. RIH with 6-%" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded I Neu recorded 1 AIM) to whipstock.
Directionally drill to 6-%" TD. Planned TD is 13,536' MD. Circulate and condition mud and perform wiper trip. POOH.
15. Pull whipstock #1. Run and set 4-¥.z" slotted liner and hook hanger, POOH and LD liner running string. Run Baker
Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, circulate and condition mud, POOH
16. PU the 7-%" whipstock assembly. Set the whipsock on the OBb liner top packer such that the top of the window is
near the top of the OBa sand (planned window exit: 6,329' MD). Orient whipstock to highside. Shear off of Whipstock
and mill window. Perform FIT to 12 ppg EMW. POOH
17. RIH with 6-%" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded I Neu recorded 1 AIM) to whipstock.
Directionally drill to 6-%" TD. Planned TD is 13,494' MD. Circulate and condition mud and perform wiper trip. POOH.
18. Pull whipstock #2. Run 4-¥.z" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook
Hanger Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools.
19. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is
near the top of the OA sand (planned window exit: 6,158' MD). Orient whipstock to highside. Shear off of Whipstock
and mill window. Perform FIT to 12 ppg EMW. POOH
20. RIH with 6-%" drilling assembly (with MWD 1 GR I Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock.
Directionally drill to 6-%" TÆ: Planned TD is 9,668' MD. Circulate and condition mud and perform wiper trip. POOH.
.1. Pull whipstock #/.. $R~~-~" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook
Hanger Lateral Éntry Module #2 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL
brine. POOH.
7
Final Permit 3/4/04
· .er Prudhoe Bay L-201 ML Permit
22. MU 4-~" 12.6# BTM-M, l-80 completion assembly and RIH. See completion schematic for details. Land tubing
hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus.
23. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to
3,500 psi. Shear DCK-1 valve.
24. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi.
25. Pull two-way check. Freeze protect the well to 2,200' TVD. Install VR plug in 7-%" casing annulus valves.
26. Install BPV. Secure the well and rig down 1 move off Nabors-9ES.
8
Final Permit 3/4/04
POST RIG - COMPLEIN
L-201, L 1, L2, & L3
.
~
TREE: FMC 4-1/16" SM
WELLHEAD: FMC Gen S System
11", SM csg.head wI?" mandrel hanger & packoff
11" x 11", SM, tbg spool wI
H To 11" x 4-1/2" tubing hanger with control line ports
§.ì -,
. ' 11" X 4-1/16" Adaptor Flange
~ 20" X 34" 215.51b1f1, A53 ERW 1"~lated
~¡ ., Halliburton X-Nipple (3.813"ID) 12,200' TVD I
1 !!ii>
- Camco 4-112" xi" KBG-2 GLM's
I Orig KB elev (N-9ES) = 28.5' I
~:i,~i:--
109'
.-
Junction Specifications:
Junction 10 through lEM
Module without diverter: 3.65"
....10"3/4", 45.5# L-80 STC Csg @ 3,19T MD
Phoenix
Pressure
Gauge
with control
lines to surface
-5/8" X 5-1/2" Baker PRM Packer
4-1/2", 12.6Ib/ft, l-80, BTC-M
Coupling 00: 5.2"
OriftllO: 3.833"/3.958"
4.5" Baker sliding sleeve with 3.813"ID
4.5" WLEG 1 6,128' MD 1
9.2 PPG Versapro MOBM below Completion
6-3/4" OAlateral 16,158'-9,668' I
.,'.,.,........'-.-....'-.,.,....-..-'-..-'-'-..-.-....,','",-",',',"
....<.':iIIIiI·::::~::.:::'~:>'::.::~:><~-.-:.~:::::::~·:--,~::-:::".::-;.....:::::::~
.._:.-:...:-_::...::::.:~'::::::::tIIIIII',::::::tIIIII-:)~-.-..:~:,:-::~- :::,:....:,:::~.:::::~-
7-5/8",29.7#, l-80, BTC-M
Casing Drift: 6.75"
Casing '0: 6.875"
6-3/4" OBa lateral 16,329'-13,494'1
- - - - _.- _. -.. - - - - - -ii
: :"':' ....::_...::-...:- :_-:....-')...:......."::-.....-:-:_.....-:-::...?...':...::.:-::~::::.- -, - .,
Baker Hughes Hookwall Hanger @ 6,148' MD
Window in 7-5/8" casing@ 6,158' MD
Well Inclination @ Window = 660
Baker Hughes Hookwall Hanger @ 6,319' MD
Window in 7-5/8" casing@ 6,329' MD
Well Inclination @ Window = 700
Baker Hughes Hookwall Hanger @ 6,491' MD
Window in 7-5/8" casing@ 6,501' MD
Well Inclination @ Window = 740
6-3/4" OBb Lateral 16,501 '-13,536'1
. !i.
:·~..-.-:iIiII<:,-,-,~:::>}III··:::··~
." - - ..¡,..- -..... .
7-5/8" Casing Shoe @ 7,091' MD
\I
6-3/4" OBd lateral 17,091'- 13,6321
DATE
REV. BY
COMMENTS
G:ER Ii. .D-.:LL
'tlJ'lil.ff..1Jl/lHÓ/N.
31412004
MIK TRIOLO
level 3 Multi-lateral, 4-1/2" Gl Completion
ORION
WELL: L-201 ML
API NO: 50-o29-xxxxx-GO
50-G29-xxxxx-60
SO-o29-xxxxx-61
SO-G29-xxxxx-62
.
.
I
-III¡¡~
I
PLANT
) IS'OO'OO'
GRID
L -PAD
33,'
/
^~3~
L-PAD ,.
PROJECT " '.
AREA
-'If§.
,I.
~';""',
"
. N-L (NWE-1)
4
T12N
T11N
w
ct:
"
i
L-111i . · N-A (NWE-2)
· L-113
L-114.
L-$O · · L-112i
· L-02
L-121 ·
· L-122
L-110 ·
L-SI · · L-115i
L-116 . · L-117
L-109 . · L-118
L-SL ·
., "
.' ,
/:i,.:~, :);~,'
;;/"<.:,....'. ;
;~'}'.'/ "".'
VICINITY MAP
N.T.S.
2
LEGEND
-+- AS-BUILT CONDUCTOR
. EXISTING CONDUCTOR
L-108i.
L-105i.
L-106 .
L-104 .
s-w .
L-102 .
~
:1
· L-103i
L-201t
L-119i
L-210'
L-120
L-01 .
L-107 .
~~
//.'J 0'
/ / /> _.~,,-
~
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERLY REGIS1ERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STA1E OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF DECEMBER 18, 2003,
r:x:oM.~
~'Q~~
...._..~~...~...,'
NOTES
I
1. DA1E OF SURVEY: DECEMBER 18. 2003.
2. REFERENCE FIELD BOOK: WOO3-14 PAGES 37-38.
3. ALASKA STA1E PLANE COORDINA1ES ARE ZONE 4, NAD 27.
GEODETIC POSITIONS ARE NAD 27.
4. BASIS OF HORIZONTAL LOCATION IS L-PAD OPERATOR
MONUMENT A TION.
5. BASIS OF ELEVATION IS L-PAD OPERATOR MONUMENTS.
ELEVATIONS ARE BP MSL DATUM.
6. MEAN PAD SCALE FACTOR IS 0.999907827.
œ
i
~
j
LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA
WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION
NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS
L-201 y= 5,978,320.84 N= 10.000.09 70"21'02.654" 70.3507372" 502' 2,598' FSL
X= 583,325.34 E= 5.340.15 -14919'24.511" -149.3234753" . 3,588' FEL
L-21Oi Y= 5,978,328.65 N= 10,000.14 70"21'02.727" 70.3507575" 50.8' 2,605' FSL
X= 583.354.28 E= 5,370.13 -14919'23.663" -149.3232397" 3.559' FEL
..
!
~
>
~
i!I
~
~o:~, ORA..,; ObP
JACOBS
CHECKED: O'HANLEY
DAlE, 12/19/03
DRA'MNC: GPB WOA L -P AD SHEET:
FRB03 WOl 02-00
~ ffi~~(IJ(~o JOB NO:
SCALE: AS-BUILT CONDUCTORS
OIOINŒIISMOLMD~ 1 Of 1
J./ LOll _ 1IØT nIIÞUD I.-c I". 130' WELLS L-201 & L-21Oi
BY otK -- ..... ....,
"
o
.
..
~
~
I
~
!
>
i 0 12/111/03 ISSUED f"CR 1Nf"QRIIAlION
;S NO. DA1£ RE\1SION
L-201 L3 (P5) Proposal S umberger
Report Date: January 29, 2004 Survey I DLS Computation Method: Minimum Curvature / Lubinski
Client: 8P Exploration Alaska Vertical Section Azimuth: 130.000'
Field: Prudhoe Bay Unit - WOA W04 Vertical Section Origin: N 0.000 II. E 0.000 ft
Structure I Slot: L-PAD / N-U ) TVD Reference Datum: Rotary Table
Well: Plan L-201 (N-U) ¥ed 03/0 TVD Reference Elevation: 78.70 ft relative to MSL
Borehole: Plan L·201 L3 OA APpro Sea Bed / Ground Level Elevation: 50,20 ft relative to MSL
UWI/API#: 50029 Magnetic Declination: 25.012'
Survey Name I Date: L·201 L3 (P5) OA / January 29, 2004 Total Field Strength: 57560.460 nT .
Tort / AHD / DDI/ ERD retio: 253.254'/7305.18 ft/6.598/1.620 Magnetic Dip: 80.823'
Grid Coordinate Syatem: NAD27 Alaska State Planes. Zone 04, US Feet Declination Date: April 02, 2004
Location Lat/long: N 70.35073717, W 149.32347531 Magnetic Declination Model: 8GGM 2003
Location Grid N/E YIX: N 5978320.840 ftUS. E 583325,340 flUS North Reference: True North
Grid Convergence Angle: ..0.63713312' Total Corr Mag North -> True North: +25.012'
Grid Scale Factor: 0.99990789 Local Coordlnatea Referenced To: Well Head
Comments I Measured I Inclination I Azimuth I TVD I Sub·S.a TVD I Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Tool Face I Northing Easting Latitude Longltud.
Depth Section Departure
(ft) (dog) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (dog/100ft) (dog/100ft) (dog/100ft) (dog ) (ftUS) (ftUS)
Top Whipstock 6158.00 65.64 103.43 4451.61 4372.91 -250.27 3808.64 2776.58 2003.12 4.00 2.25 3.65 30.00G 5981119.25 585297.27 N 70.35832178 W 149.30720778
Base Whipstock 6170.00 67.31 104.47 4456.40 4377.70 -240.39 3819.64 2773.92 2013.79 16.00 13.89 8.67 O.OOG 5981116.72 585307.98 N 70.35831452 W 149.30712107
KOP Cry 10/100 6183.00 67.31 104.47 4461.41 4382.71 -229.56 3831.63 2770.93 2025.41 0.00 0.00 0.00 20.66G 5981113.85 585319.62 N 70.35830633 W 149.30702677
6200.00 68.90 105.11 4467.75 4389.05 -215.29 3847.41 2766.90 2040.66 10.00 9.36 3.78 20.42G 5981110.00 585334.92 N 70.35829532 W 149.30690292
6300.00 78.31 108.66 4495.95 4417.25 -127.15 3943.23 2739.01 2132.32 10.00 9.41 3.55 19.41G 5981083.13 585426.87 N 70.35821905 W 149.30615862
6400.00 87.75 111.97 4508.08 4429.38 -33.80 4042.38 2704.57 2225.28 10.00 9.45 3.31 19.01G 5981049.73 585520.20 N 70.35812488 W 149.30540377
90' PI 6423.80 90.00 112.74 4508.54 4429.84 -11.13 4066.17 2695.52 2247.28 10.00 9.46 3.26 18.99G 5981040.92 585542.30 N 70.35810014 W 149.30522509
End Cry 6491.18 96.37 114.95 4504.80 4426.10 53.45 4133.42 2668.34 2308.78 10.00 9.45 3.27 O.OOG 5981014.43 585604.09 N 70.35802585 W 149.30472571
Cry 10/100 6561.67 96.37 114.95 4496.97 4418.27 121.11 4203.47 2638.79 2372.30 0.00 0.00 0.00 102.33G 5980985.60 585667.93 N 70.35794508 W 149.30420993
Tgt 2 OA / Cry 6/100 6592.79 95.70 118.00 4493.70 4415.00 151.19 4234.42 2625.00 2400.00 10.00 -2.16 9.82 102.06G 5980972.12 585695.78 N 70.35790737 W 149.30398504
6600.00 95.61 118.43 4492.99 4414.29 158.21 4241.59 2621.61 2406.32 6.00 -1.26 5.90 102.11G 5980968.80 585702.14 N 70.35789810 W 149.30393371
End Cry 6663.34 94.80 122.15 4487.24 4408.54 220.38 4304.67 2589.80 2460.78 6.00 -1.28 5.89 O.OOG 5980937.59 585756.94 N 70.35781115 W 149.30349154 .
Cry 6/100 7022.23 94.80 122.15 4457.20 4378.50 574.66 4662.30 2399.47 2763.56 0.00 0.00 0.00 -162.49G 5980750.66 586061.79 N 70.35729089 W 149.30103329
7100.00 90.35 120.75 4453.71 4375.01 651.47 4739.97 2358.94 2829.82 6.00 -5.72 -1.80 -162.55G 5980710.88 586128.49 N 70.35718011 W 149.30049536
L-201 L3 Tgt 3 OA 7101.75 90.25 120.72 4453.70 4375.00 653.19 4741.72 2358.05 2831.32 6.00 -5.72 -1.80 -127.10G 5980710.00 586130.00 N 70.35717767 W 149.30048314
End Cry 7101.85 90.25 120.72 4453.70 4375.00 653.29 4741.82 2358.00 2831.41 6.00 -3.62 -4.79 O.OOG 5980709.95 586130.09 N 70.35717753 W 149.30048244
Cry 6/100 8129.44 90.25 120.72 4449.28 4370.58 1667.41 5769.40 1833.14 3714.83 0.00 0.00 0.00 89.96G 5980195.00 587019.21 N 70.35574262 W 149.29331058
8200.00 90.25 124.95 4448.98 4370.28 1737.40 5839.96 1794.89 3774.11 6.00 0.00 6.00 89.98G 5980157.41 587078.90 N 70.35563804 W 149.29282939
L-201 L3 Tgt 4 OA 8263.35 90.25 128.75 4448.70 4370.00 1800.64 5903.31 1756.91 3824.79 6.00 0.00 6.00 68.18G 5980120.00 587130.00 N 70.35553420 W 149.29241801
8300.00 91.07 130.79 4448.28 4369.58 1837.29 5939.96 1733.46 3852.96 6.00 2.23 5.57 68.20G 5980096.87 587158.42 N 70.35547012 W 149.29218939
8400.00 93.29 136.37 4444.48 4365.78 1936.98 6039.88 1664.61 3925.31 6.00 2.22 5.58 68.42G 5980028.83 587231.53 N 70.35528191 W 149.29160214
8500.00 95.47 141.97 4436.83 4358.13 2035.36 6139.58 1589.20 3990.48 6.00 2.19 5.60 68.84G 5979954.16 587297.53 N 70.35507581 W 149.29107336
End Cry 8593.62 97.48 147.26 4426.27 4347.57 2125.34 6232.60 1513.40 4044.33 6.00 2.14 5.64 O.OOG 5979878.97 587352.21 N 70.35486865 W 149.29063643
Cry 6/100 8594.02 97.48 147.26 4426.22 4347.52 2125.72 6233.00 1513.06 4044.54 0.00 0.00 0.00 117.14G 5979878.64 587352.43 N 70.35486773 W 149.29063468
8600.00 97.31 147.58 4425.45 4346.75 2131.38 6238.93 1508.07 4047.74 6.00 -2.74 5.38 117.18G 5979873.68 587355.68 N 70.35485408 W 149.29060878
8700.00 94.54 152.93 4415.11 4336.41 2224.65 6338.38 1421.74 4097.05 6.00 -2.77 5.35 117.73G 5979787.92 587405.95 N 70.35461817 W 149.29020873
8800.00 91.74 158.24 4409.63 4330.93 2314.66 6438.22 1330.86 4138.30 6.00 -2.81 5.31 118.02G 5979697.51 587448.19 N 70.35436983 W 149.28987424
L-201 L3 Tgt 5 OA 8861.52 90.00 161.50 4408.70 4330.00 2367.99 6500.05 1273.11 4159.46 6.00 -2.82 5.30 96.30G 5979640.00 587470.00 N 70.35421203 W 149.28970265
8900.00 89.75 163.79 4408.79 4330.09 2400.39 6538.53 1236.39 4170.94 6.00 -0.66 5.96 96.29G 5979603.41 587481.88 N 70.35411169 W 149.28960964
Well Design Ver 3.1RT-SP3.03-HF2.03 Bld( d031rt-546)
N-UIPlan L-201 {N-U)IPlan L-201L3 OAIL-201L3 (P5) OA
Generated 3/4/2004 9:00 AM Page 1 of 2
Comments Measured I Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I Along HOle' NS EW , DLS I Build Rate I Walk Rate , Tool Face I Northing Ea.Ung Latitude Longitude
Depth Section Departure
(ft) (dog ) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (dog/100ft) (dog/100ft) (dogl1ooft) (dog ) (ftUS) (ftUS)
9000.00 89.09 169.76 4409.80 4331.10 2480.45 6638.52 1139.09 4193.80 6.00 -0.66 5.96 96.23G 5979506.38 587505.82 N 70.35384585 W 149.28942445
9100.00 88.45 175.73 4411.95 4333.25 2553.84 6738.50 1039.96 4206.43 6.00 -0.65 5.97 96.10G 5979407.41 587519.55 N 70.35357501 W 149.28932240
9200.00 87.82 181.70 4415.21 4336.51 2619.76 6838.44 940.08 4208.68 6.00 -0.63 5.97 95.91G 5979307.57 587522.91 N 70.35330216 W 149.28930460
9300.00 87.21 187.67 4419.55 4340.85 2677.49 6938.35 840.56 4200.52 6.00 -0.60 5.98 95.65G 5979207.97 587515.86 N 70.35303027 W 149.28937124
9400.00 86.64 193.65 4424.92 4346.22 2726.39 7038.20 742.47 4182.06 6.00 -0.57 5.98 95.33G 5979109.69 587498.49 N 70.35276233 W 149.28952160
9500.00 86.10 199.64 4431.25 4352.55 2765.94 7138.00 646.90 4153.48 6.00 -0.54 5.99 94.95G 5979013.82 587470.98 N 70.35250128 W 149.28975401
9600.00 85.61 205.64 4438.49 4359.79 2795.69 7237.75 554.88 4115.11 6.00 -0.50 6.00 94.52G 5978921.39 587433.64 N 70.35224997 W 149.29006594
End Crv 9600.24 85.60 205.65 4438.51 4359.81 2795.75 7237.98 554.67 4115.01 6.00 -0.47 6.00 O.OOG 5978921.18 587433.54 N 70.35224939 W 149.29006677
TD / 4-1/2" Lnr 9667.95 85.60 205.65 4443.70 4365.00 2812.48 7305.49 493.81 4085.79 0.00 0.00 0.00 O.OOG 5978860.00 587405.00 N 70.35208316 W 149.29030431 e
LeQal Description:
NorthlnQ (Y) [ftUSl Eastlnq (X) [ftUSl
Surface 2597 FSL 3588 FEL S34 T12N R11E UM 5978320.64 583325.34
Tgt 2 OA 5222 FSL 1184 FELS34 T12N R11E UM 5980972.12 585695.78
L-201 L3 Tgt 3 OA 4955 FSL 753 FEL S34 T12N R11E UM 5980710.00 586130.00
L-201 L3 Tgt 4 OA 4353 FSL 5040 FEL S35 T12N R11E UM 5980120.00 587130.00
L-201 L3 Tgt 5 OA 3869 FSL 4707 FEL 535 T12N R11E UM 5979640.00 587470.00
TO / BHL 3090 FSL 4782 FEL S35 T12N R11E UM 5978860.00 587405.00
.
Well Design Ver 3.1RT-SP3.03-HF2.03 Bld( d031rt-546)
N-UIPlan L-201 (N-U)IPlan L-201 L3 OAIL-201 L3 (P5) OA
Generated 3/4/2004 9:00 AM Page 2 of 2
g
o
o
o
,...
~
,...
II
()
TI
(/)
CI
¡:::
Schlumb8rU8r
WEll
FIELD
Prudhoe Bay Unit - WOA
STRUCTURE L-PAD
L-201 L3 (P5)
Magnetic Pamm8leB
Modal: 800M 2003
Surfaoelocation
Lat: N702t2.8M
Lon: W1491924.511
TVDRet: RotaryT8bI8(78.70ftaboveMSl)
SrvyDate: Januery29,2004
NAD27 Alaska State Planes, Zone 04, US Feet
Northing: 5918320.84ftUS GridConv: +0.63713312'
Eastlng: 563325.34 flUS Scale Fad.: 0.9999078872
MI&eellaneous
Slot; N-U
Plan: L-201L3(P5)OA
Dip: 80.823'
MagDac: +25.012'
Date: "¢I 02, 2004
FS: 57560.5nT
.
-1000
o
1000
2000
3000
4000
5000
6000
7000
4000
'-201 (P5b) OBd :
·1-·· jéff·····" ......... ...¡...... ...... .... ... -..... -r-...' .......... .00...... ·-r····· '_00.... ......... ·T····· '.00_....' .'..'..".r-'..'.' '.00...." ....... .'t........ .00.......00..... .¡-.-........ ......... ...-... r
:.:t:::::: ···.::::::f;:~~~ ;:::·~~¡~;;:::::;::::::·::::::::hW:::::::::::::::::T~:k:;¡'::¡:òf::::::::::::::J::::::::::::::::::::::::::::h::::::::::::::::::::.:::::::k::.::::::::::::::::::::::;;~:::::::::::::.::::::::::::::1:: 4000
..;........ 1 ........... '1~s¡,.U-%tx.6IJ~..!'USU.Q^-...oo.:~.1!-J..CJl.L'l.oo....~.-¿t:.".".OO.'..............¡.........._...oo....oo_oo...;'...................._.......¡................._..........;.
¡1¡~I~¡¿g:;:;~~;:~~;~~~:.i~ê~::'~';~':~¡,~~.~~~;";'~¡¡'~1¡"¡"~¡"::;";:f":":';:::":':":'::~'¡;:1"1"1';1"~'1i;;.;~;:
¡ KOP Cry 10/100 90' PI ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡
¡r¡-'Ir--'Ifl" 5~
.
5000
-1000
o
1000 2000 3000 4000 5000
Vertical Section (ft) Azim = 130·, Scale = 1(in):1000(ft) Origin = 0 N/-S, 0 E/-W
6000
7000
^
^
^
z
g
o
o
'!<
~
~
II
Q)
ro
()
C/)
C/)
V
V
V
Schlumberger
WELL
FIELD
Prudhoe Bay Unit - WOA
STRUCTURE L-P AD
L-201 PB3 (P5)
Magnetic Þatamete~
Model: BGGM 2003
SurfaoaLocatioo
Lat: N70212.654
Lon: W1491924.511
NAD21 Alaska Slate Planes, Zone 04, US FE181
Northing: 5918320.84ftUS GridConv; +0.63713312'
Easling: 583325.34 ftUS Scale Fact: 0.9999078872
Ml&cellaneoua
Slot: N-U
Plan: L-201L3(PS)OA
Dip; 80.823'
Mag Dee: +215.012'
Date: April 02. 2004
FS; 57560.5nT
TVD Ref: RotaryTable (18.TO It above MSL)
&vy Date: JanU8l)' 29, 2004
1500
2000
2500
3000
3500
4000
4500
5000
2500
.
:IV ¡
Cry 6/ioo ; ; Jti.. ¡
¡ ':::'7:::' '~1~:;;:~~....I.._m...........r......r_m......mm_mI-...
~~,~~~?1.............,,····...............,+...,...........,.,.............,.,.j.....,..,
t""···~ ¡ !
... t,·· ............".... .......'...... .j.... ............ ......... ...., ....·t....'.... .......... ..... .,.., ..'...-¡-...."... ........ ,.........,. .,.. ...¡...... ........ ..... "!Ëíið' CN .... ........................
2000
En'1:fv~ OIl 00
Tr 21 Cry 6/100
1500
.
2500
2000
1500
.
.-201 (P5b) OBd
K .-201 L 1 (P3) OBb
! .-201L2 (P3) OB.
1000
500
1500
2000
2500
3000 3500
<<< W Scale = 1 (in):500(ft) E >>>
4000
4500
5000
1000
500
.
.
BPX AK
Anticollision Report
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 6158.00 to 9667.95 ft
Maximum Radius: 10000.00 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 1/8/2004 Validated: No
Planned From To Survey
ft ft
28.50 6158.00 Planned: Plan #5 V1 (0)
6158.00 9667.95 Planned: Plan #5 V1
Version: 2
Toolcode
Tool Name
MWD+IFR+MS
MWD+IFR+MS
MWD + IFR + Multi Station
MWD + IFR + Multi Station
Casing Points
3189.31
6158.00
9667.95
2638.70
4451.61
4443.70
10.750
7.625
4.500
13.500
9.875
6.750
103/4"
7-5/8"
4 112"
Summary
EX NWE#1 NWE1-01A NWE1-01A V4 Out of range
EX NWE#1 NWE1-01 NWE1-01 V3 Out of range
PB L Pad L-01 L-01 V14 Out of range
PB L Pad L-01 L-01 L 1 V2 Plan: Plan # Out of range
PB L Pad L-02 L-02 V1 Out of range
PB L Pad L-02 L-02PB1 V21 Out of range
PB L Pad L-102 L-102 V2 9661.31 7250.00 1 093.43 121.97 971.45 Pass: Major Risk
PB L Pad L-102 L-102PB1 V10 7050.00 2500.00 3801.49 67.06 3734.43 Pass: Major Risk
PB L Pad L-102 L-102PB2 V2 7050.00 2650.00 3664.84 66.96 3597.88 Pass: Major Risk
PB L Pad L-103 L-103 V23 9252.48 6800.00 669.44 90.10 579.34 Pass: Major Risk
PB L Pad L-104 L-104 V7 Out of range
PB L Pad L-105 L-105 V4 Out of range
PB L Pad L-106 L-106 V14 7050.00 4850.00 2817.63 79.91 2737.72 Pass: Major Risk
PB L Pad L-107 L-107 V14 Out of range
PB L Pad L-108 L-108 V18 Out of range
PB L Pad L-109 L-109 V12 Out of range
PB L Pad L-110 L-110V11 Out of range
PB L Pad L-111 L-111 V24 Out of range
PB L Pad L-112 L-112 V8 Out of range
PB L Pad L-114 L-114V15 Out of range
PB L Pad L-115 L-115 V7 Out of range
PB L Pad L-116 L-116 V10 Out of range
PB L Pad L-117 L-117V11 Out of range
PB L Pad L-118 L-118 V9 6158.00 7600.00 1747.06 84.37 1662.69 Pass: Major Risk
PB L Pad L-119 L-119V9 6437.92 6100.00 132.09 78.47 53.62 Pass: Major Risk
PB L Pad L-120 L-120 V8 8334.44 6500.00 410.84 102.79 308.05 Pass: Major Risk
PB L Pad L-121 L-121 V14 Out of range
PB L Pad L-121 L-121A V1 Out of range
PB L Pad L-122 L-122 V5 Out of range
PB L Pad L-200 Plan L-200 OBd V1 Plan Out of range
PB L Pad L-200 Plan L-200L 1 OBa V3 PI Out of range
PB L Pad L-200 Plan L-200L2 OA V3 Pia Out of range
PB L Pad L-21 0 L-210V6 9230.33 6350.00 987.98 85.71 902.27 Pass: Major Risk
PB L Pad L-210 L-210PB1 V8 9236.36 6250.00 1003.91 83.29 920.62 Pass: Major Risk
PB L Pad Plan L-113 (N-B) Plan L-113 V5 Plan: PI Out of range
PB L Pad Plan L-123 (N-R) Plan L-123 V1 Plan: PI 8147.58 6850.00 298.49 110.15 188.33 Pass: Major Risk
PB L Pad Plan L-124 (N-C) Plan L-124 PB1 V1 Plan Out of range
PB L Pad Plan L-124 (N-C) Plan L-124 V1 Plan: PI Out of range
PB L Pad Plan L-201 (N-U) Plan L-201 OBd V1 Plan 6199.97 6200.00 0.95 81.12 -80.17 FAIL: Major Risk
PB L Pad Plan L-201 (N-U) Plan L-201 L 1 OBb V2 PI 6199.97 6200.00 0.95 81.21 -80.26 FAIL: Major Risk
PB L Pad Plan L-201 (N-U) Plan L-201L2 OBa V2 PI 6199.97 6200.00 0.95 81.21 -80.26 FAIL: Major Risk
PB L Pad Plan L-211 (N-H) Plan L-211 V1 Plan: PI Out of range
--294
......·200
······100
-0
--100
"·200
-294
Field: Prltußoe Bay
Site: PB L Pad
Well: Plan L-201 (N-U)
Wellpath: Plan L-201L3 OA
Plan L-201 (N-V) (Plan L-201 OBd)
27Û'
180 2,4
.
90
.
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [IOOft/in]
e
e
PERMIT TO DRILL
20 MC 25.005
(e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well
branches are proposed from a single conductor, surface, or production casing, the applicant shall
designate one branch as the primary well bore and include all information required under (c) of this section
with the application for a Permit to Drill for that branch. For each subsequent well branch, the application
for a Permit to Drill need only include information under (c) of this section that is unique to that branch
and need not include the $100 fee.
.
.
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
'YELL NAME /ð 6{ ¿- 201 L.3
PTD# .zotf - 0 i 1
X·Development
Service
CHECK WßA T
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
x
(If API num ber
last two (2) digits
are between 60-69)
Exploration
Stratigraphic
~'CLUEn
Tbe permit is for a new weJlboresegment of
existing weD /J1J?1 L- 20/
Permit No~o~-o~~API No. 5c -ó/-1 ~ .:z.J 2..0..2-..
Production sbould continue to be reported as
a function· of tbe original API number. stated
above.
BOLE In accordance witb20 AAC 25.005(f), all
records, data and logs acquired for tbe pilot
bole must be clearly differentiated In botb
name (name on permit plus PH)
and API Dumber (SO
70/80) from records, data and logs acquired
for we)) (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved subject ·to fuD
compliance witb 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumestbe liability of any
protest to tbe spacing exception tbat may
occur.
All dry ditcb sample sets submitted to tbe
Commission must be in no greater tban 30'
sample intervals from below tbe permafrost
or from wbere samples are first caugbt and
10' sample intervals tbrough target zones.
.
.
~
o
Well bore seg
Annular Disposal
Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: ffiUDHOE BAY UN ORIN L-201 L3 _ Program DEV
--~
PTD#: 2040490 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L- GeoArea 890 Unit j 1650 On/Off Shore On
Administration 1 p~(I1")itfee attache_d _ - - - - ~ Yes
2 _Lease_number _appropri<lte_ _ _ Yes
3 _U_nlque weltn_ame_a[1d oL!mP.er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - y~s ~ - - - - - - - - - - - - - - - - - - - - - - --
4 WelIJoc<lt~d in a d_efine.ctpool_ _ _ - - - - Yes
5 WeJIJoc<lled proper _distance_ from driJling unitbound_al"Y_ _ _ _ - - y~s - - - - - - - -
6 WellJoc<lled proper _distance_ from other wells ~ - - - y~s
7 _S_ufficient _acreage_aYail<lble indJilIiog unjt_ y~s
8 J(d~viated, js weJlbore plaUocJu_ded _ _ Yes - - - - - - - -
9 _Qperator only affected party _ - - - - - - Yes
10 _O-perator bas_appropriateJ~ond inJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - Y~$ - - - - - - - - - - - - - - - - - - - - - - - --
11 P~rmit c.ao be iSSL!ed without conserva_tion order _ _ - - -- - Y~s
Appr Date 12 P~rmilcao be issued without ad_mioistratille_approval _ Y~s - - - -
RPC 3/8/2004 13 Can permit be approved before 15-day wait Yes
14 WeJIJocaled within area and_strata _authorized by_lojectioo Ord~r # (puUO# incomm~[1t$>-(For _NA
15 AJlwel!s_witÞinJl4J1)ile_area_ofreyiewid~Ot[fied(FJ)rsefVjc.eJr(ellooly)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA - - - - - - - - - - - - - - - - - . -- - - - --
16 Pre-produced i[1jector: .c:tur<ltio_nof pre--pro.c:tuctioo I~Ss. tÞal13 months_ (for_service well onJy) _ _ _NA
17 ACMP_FJndjngofCon_siste[1cy_h_as beenJs.sued_forJbis Project _ _ _ _ _ NA
Engineering 18 C_o[1ductor stringpJovided _ _ - - -- _ _ _NA
19 _Swface _casing protects al'-known USDWs _ _ _ _ _ _NA
20 _CMTvoladeQuateJo circ_ulate_on_cood_uctor& SUJfcsg _ _ NA
21 _CMT vol adeQuateto tie-in Jong string losurf csg _ _ __NA
22 _CMT will coyeraJl koownproductiye hori¡tol1s No_ Slotte_d, - - --
23 C_asiog de_si~[1s ad_equate for C,T, B_&perroafrosl _ _ _ _ _ Yes
24 A.c:tequ<lte_tankageoneselYe pit _ _ _ _ _ _ _ _ _ _ _ y~s Nabors9ES, - - --
25 JtaJe-.c:trilt has a_ 10-403 for <lbandOl1ment be~o <lPPJoved _ _ _NA Quadlateral._ _ _
26 A.c:tequ<lteJ/llellboresepar<ltjon_propose.c:t_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - y~s - - - - - - ~ - - - - - - - - - - - - ~
27 J(div~cterJeq_uired, does it me~t reguJatioos_ _ _ _ _ NA Sidetrack. _ . _
Appr Date 28 DJilliog fJuid_ program schematic & eC1-uip Jistadequ<lle _ _ _ _ y~s Max MW9,2 ppg. _ _
WGA 3/8/2004 29 ßOPEs,d9Jhey meelreguJa.tiolJ _ y~s
30 _BOPEpress ralil)g approp(Ïate;test lo_(puJ psig Ln_commeots) Yes Test lo_35QQpsi.MS~ 16_80 psi. - - - - -
31 C_hokema.nifold compJies w/APt RF>-53 (May 84)_ . Yes
32 Work will occur withoLJloperatio!1_shutdow.n _ _ . y~s ~ - - -
33 Is presence of H2S gas_ prob.able. . - ~ - - ~ No. - - - -
34 Meçhanical_coodition of wells withio AOB yerified (fors_ervjce welJ onJy) .NA
~ -
Geology 35 P~rmit c.an Þe issued w/o hydrogen sulfide meaSUres _ _ . y~s
36 D_ata_ PJeseoted 011 pote_ntial oveJpres_sure _zooes _ _ _ NA
Appr Date 37 _S~ismic_analysjs_ of shaJlow gaszol)es_ . NA
- - --
RPC 3/8/2004 38 _S~abed _cOlJditiol) survey (if off-shore) _ . _NA
39 . Contact namelpÞoneforweekly progress reports (exploratol"Yonly] NA
Geologic Date: Engineering Date ;¡~f
Commissioner Commissioner:
bfS ~(?J1-