Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-049 e e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. aO 4:- - O.Y- _q Well History File Identifier y0wo-sided 1111111111111111111 Organizing (done) o Rescan Needed 11111111I1111111111 RES CAN 0I9IT AL DATA \zf'Oiskettes, No.~ o Other, NolType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Color Items: o Greyscale Items: o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Date &, 1 010 o Other:: BY: ~ 151 Wtf 1111111111111111111 V11f Project Proofing BY: ~ Date (¡;(r 0 ~ :l x 30 = ~ () Date: to q 0 to 151 Scanning Preparation BY: , Maria.J + d. 9) = TOTAL PAGES C($"g (Count does not include cover sheet) ,/lAP 151 r r ~ Production Scanning 1/11111111111111111 Stage 1 Page Count from Scanned File: <t? c¡ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES BY: ~ Date: 10 /1/0 (¡; 151 NO vvtP Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: 151 11/1111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked 1111'111I111111111I 10/6/2005 Well History File Cover Page.doc • _~-F~__~ ,~:~ ~_. MICROFILMED 03/01 /2008 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F: \LaserFiche\CvrPgs_Inserts\Microfilm_Marker. doc 11/14/06 11/17/06 Schlumberger NO, 4040 Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: Alaska Oil & Gas Cons Comm Att": Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Well Job # Log Description Date BL Color CD L-201L1 PB1 40010303 OH EDIT OF MWD/LWD 04/09/04 2 1 L-201L3 PB1 40010303 OH EDIT OF MWDILWD 04/25104 2 1 V-210 40011161 OH EDIT OF MWDILWD 11/05/04 2 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc Petrotechnical Data Center LR2·1 900 E Benson Blvd Anchorage AK 99508-4254 NOV ~~ ;:¡ Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503.283iL. A TTN Beth A _ ~ ______ Received by L~- L . Date Delivered' p. ¿Jeff - 040 -/;k I '--I f) b 15 ~ 11/08/06 sc.....ger ~IOV 1 32006 NO. 4029 Schlumberger-DCS 2525 Gambell St. Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Company: Alaska Oil & Gas Cons Comm Att": Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 i~t.I!W~ 011 f~ (~1\".,,* COO;;;. Com~ Field: Orion Well Job # Log Description Date BL Color CD V-204L1 40010781 OH EDIT OF MWD/LWD 08/14/04 1 1 V-204L1 PBI 40010781 OH EDIT OF MWD/LWD 08/14/04 1 1 V-204L2 40010781 OH EDIT OF MWD/LWD 08/22/04 1 1 V-204L2 PBI 40010781 OH EDIT OF MWD/LWD 08/22/04 1 1 V-204PB2 40010781 OH EDIT OF MWD/LWD 08/09/04 1 1 V-204L3 40010781 OH EDIT OF MWD/LWD 08/28/04 1 1 L-201 40010303 OH EDIT OF MWDILWD 04/03/04 2 1 L-201 PBI 40010303 OH EDIT OF MWD/LWD 03/30/04 2 1 L-201 PB2 40010303 OH EDIT OF MWD/LWD 04/01/04 2 1 L-201LI 40010303 OH EDIT OF MWDILWD 04109/04 2 1 L-201L2 40010303 OH EDIT OF MWD/LWD 04/19/04 2 1 L-201L3 40010303 OH EDIT OF MWD/LWD 04/26/04 2 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc Petrotechnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Sch/umberger-DGS 2525 Gambel! St. Suite 400 Anchorage. AK 99503-2838 A TTN: Beth Date Delivered" Received by: . doL..I-o~CJ :p: 1~;)31 '30 ~ ~ DATA SUBMITTAL COMPLIANCE REPORT 4/24/2006 Permit to Drill 2040490 Well Name/No. PRUDHOE BAY UN ORIN L-201L3 Operator BP EXPLORATION (ALASKA) INC 5 III ~ ~~Aqo y API Z. 50-029-23202-62-00 MD 9860 TVD 4422 Completion Date 4/30/2004 Completion Status 1-01L Current Status 1-01L UIC N ~--------- ---- -~----- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes --------- .------ -- ------ DATA INFORMATION Types Electric or Other Logs Run: MWD 1 GR / RES I Azimutal DEN 1 NEU 1 AIM 1 PWD Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number i ED D Asc L~~__ ____~__ (data taken from Logs Portion of Master Well Data Maint Run No Interval Start Stop ~. Name Directional Survey Log Log Scale Media OHI CH Received 5f! /2004 5f!12004 Comments Directional Survey Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments ADDITIONAL INFORMATION Well Cored? Y &> Chips Received? - ) 1 N Daily History Received? IçJj N Formation Tops t@N Analysis Received? ~ ~. --------~- - -- -~----- Comments: Compliance Reviewed By: '-.J b Date: ;;;.s ~ ).ß a ~ -----~ ------.---- -- --..--------- Andy, Open hole log data is missing for the following wells: PBU Orion L-201 50-029-23202-00 PBU Orion L-201 L 1 50-029-23202-60 PBU Orion L-201 L2 50-029-23202-61 PBU Orion L-201 L3 50-029-23202-62 Please submit to the Commission as soon as possible; Open Hole digital log data ( LIS, DLlS, or LAS) Open Hole Blue line logs Open Hole reproducables - sepia/mylar or digital graphics files (.pds or .pdf or .emf ) TNX for your help. Howard tn~ ~.; ;:.. {j(."". mff'" . -... f 1~,t,. .. ~ "..!...' i ~ ~':'. ...~ 'i~!,:- .:-. ~- ~ . -;;~~ .." t .: 'f;' ....'1 t: '1 ':--- ~,': ",," :<': ! wvvvv. Petrol e u m N ews.com . NORTH SLOPE ~;·~çTßj ¡:f<€fì~ ~.~ Ai:t: 1!~: {1\1 ~ocr- () £fC[ ,I ' It) 31 lot PETROLEUM NEvVS 9 pß\.J L-.1DI L3 BP cOInpletes quad-lateral at Orion Drilling end of viscous equation appears solved; production oj heavy oil still an issue because oj sand produced with oil and welllnaintenance issues By KRISTEN NELSON PcLrolculII News EdiLor-in-Chicf The viscous oil resource on Alaska's NOlih Slope - like the natural gas resource there - has been known (011 decades, but heavy oil has bcen as stranded as gas, stranded in the ground through lack of the technology and knowledge Ileces- salY to produce it. UP Exploration (Alaska) has been working on ways to produce viscous oil, also reCen'cd to as heavy oil, at Milne Point since the 1990s and now also has viscous oil under devclop- . men! in the weslem Prudhoe L :1 /2 A't.Jÿ satellites. . '. ., Multi-lateral horizont.al S E R I E S wells have solved the drilling side of the viscous equation, but problems remain on the production side, members of BP Exploration (Alaska)'s drilling team told Petroleum News in late September. Viscous oil accumulations lie closer to the surlllce and are colder, less mobile and have poorer reservoir quality than conventional crude oil, said Mik Triolo, Greater Pl1ldhoe Bay operations drilling engineer. Triolo worked the Schrader Bluffviscous accumu- lation at Milne Point before moving over to Orion, working on the carly multi-lateral and horizontal well designs in late 1999, early 2000. "And we've progres- sively evolved that technology ever since," he said. That work is continuing at Orion, a Pl1ldhoe Bay western satellite viscous· oil accumulation. Multi-lat- eral wells, well bores with multiple horizontal laterals into shallow sands containing viscous oil, make wells productive enough to bc economic. First tri-Iateral in 2003 In 2003, DP drilled the first tri-Iateral multi-lateral well on the slope, and this year, the company set a world record with a quad-lateral well. "Horizontal multi-lateral wells have been the key to unlocking those (viscous) reserves... predominate- ly through efficient geo-stccring within the segregated sands... Rather than undulating through them," Triolo About the series Editor S Note: Members of BP Exploration (Alaska) s drilling group sat down with Petroleum News Sept. 28 to talk about the company's development drilling program, recent drilling records and about the technology that is driving the company s North Slope development drilling. Part 1 of this story, printed ill the Oct. 10 issue of Petroleum News, included all overview of the company s North Slope drilling activity and an update on its coiled tubing drilling pro- gram. Part 2, which appeared in the Oct. 24 issue, described multi-lateral drilling at Milne Point, and wel/maintenance work. said, "we actually stick dedicated laterals into each one of the sand intervals." In addition to better ability to steer through the fonnations, drilling also helps vis- cous oil deveJopment with "good well design," he said. A cl1lcial part of the well is where the laterals branch fi'OIll the main well bore, and Br has also been trying different junction designs, the connection between the main well bore and the lateral. At Milne Point BP detemlined "that the level three, the TAML level three junction, was the junction of choice.. .," Triolo said. TAML stands for Technical Advancement of Multilaterals, an organization set up to regulate "the different levels of multilateral junction equipment such that everything is standardized," he said. "So if Baker comes out with a level-thrce junc- tion, the criteria that are set up to distinguish between a level-three and a level-four, are the same as for Halliburton.. ." The TAML levels, said Mark Johnson, BP senior coiled tubing drilling engineer, "refer to the re-entty capability of the junction and how well it seals or iso- lates at that jWlction." Re-entty capability and the seal see BP page 10 ~ -<' 10 ---...- ,~. continued from page 9 ;.c :.c: ~ ~ z o . provided are the two primary things a junc- 5 tion does, he said. ~ x Triolo said BP detennined "that we did ~ not need isolation at the junction - what we ~ needed was access to the lateral, so the level- ~ three junctions became the method of ~ ::;) choice." 8 BP First level-three, quad-lateral well in world BP took its experience at Milne Point to Orion, a western Prudhoe Bay satellite, and this year "we drilled the first level-three quad-lateral multi-lateral well in the world," Triolo said. (The accompanying graphic illustrates such a quad-lateral multi-lateral well.) BP's initial experience with multi-lateral wells was that complicated wells were . expensIve for the wells group to maintain: "We didn't really have cost-et1cctive ways to work on the wells or impact the flow streams of the wells later in life, so we went back to the drawing board and came up with some criteria that we wanted to see achieved in our well designs, and then worked with our v.endors to come up with a solution to those problems." The current system, he said, was "proved up in Milne Point" and the junction design was modified at Orion "to add more e!1ì- ciel1cy to the full life-cycle cost of the well," Triolo said. Well work can now be done through the tubing, with a coiled tubing unit, without the need for a workover rig. The total footage in the quad-lateral well, Prudhoe Bay unit L-20 I, was almost 35,000 feet, with "almost 28,000 ieet of horizontal footage within these thin bedded sands," more than five miles of horizontal footage in OIlC well, Triolo said. There were cleanup issues with the well, and UP didn't realize full flow potential, but the well had a productivity index of 40 (a measure of bands per pound of square inch drawdown), compared to most wells on the slope somewhere ill the 20-range. "If we could have opened it up lull bore, we probably would have been somewhat tubing limited," he said. Facility limited Right now the well is facility limited, Triolo said. Daren l3eaudo, I3P's director of public affairs, said one of the things BP worked on during the summer production G~ÆY1ht6rAf" vlscoua OIL QUAD ML COMPLETION - "JF 11 J R) , Ht J ill ~ ~1_.~_. >- . . .. .... .. ~-- ~04·- D 1.ffC¿TROLEUM NEWS. WEEKOFOcrOBER31,2004 ~ ,";~~~¥;!-:>i~=}~~;_~~~~ shutdown at Prudhoe Bay was cleaning sand out of tanks in Gathering Center 2. "One of the constraints that we've had is managing all of this sand," he said. "This is a viscous oil production issue, nol a well-rate issue," l3eaudo said, and the issue is the sand produced with the viscous oil. To really produce viscous to the maxi- mum, BP will either have to add facilities to handle sand that comes to the surface or find a way, such as screens, to kcep the sand in the rcselvoir. Not only does sand accumulate in pro- duction facilities, said Andy Kirk, BP's Alaska drilling and wells pcrfOlmancc con- sultant, but it also causes problems in pipelines because it is cOITosive - another reason to keep it in the IOllllation. And if a multi-lateral well has to be shut in and the oil stops flowing, Kirk said, the sand can layout along the horizontal portion ofthe well, creating dunes which plug up the well, making it difficult to re-establish pro- duction when the wcll is brought back online. Opportunity huge The oPP0l1unity for viscous' is huge: '"<4.- ~,""__ :;;~~Ñx;~~;]J=~:'"t::!¢~e some I.6 billion barrels recoverable with current technology, said Gary Christman, BP's Alaska drilling and wells manager. "We're going through kind of a concept selection phase ... and one of the things that we don't know is how we're going to handle all this production, because it is dif- ferent." "This multi-lateral technology has unlocked the flow potential," said Johnson. "now we can finally get that reservoir to flow at economic rates - and that's been the challenge for the last 20 years. ..." There are other issues now connected with gctting viscous production to the sur- làce, "but the key thing is that this multi- lateral has unlocked viscous oil." Christman said the horizontal footage drilled in the quad-lateral well, the 25,000- lèet of horizontal hole, has "nol been done anywhere else in the world: it's just huge, just huge stuff." The issues, now, Christman - said, are sand control and long-term serviceability of the multi-lateral wells: "The mullilaterals are there, but do we know we can keep them all producing for many, many years? "It will be a sand control issue... And "Horizontal 11lulti-lateral wells . l1ave been the hey to unlochil1g those (viscous) reserves... predominately through efficient geo-steeJing within the segregated sands... Rather than undulating throug~~ them, we actually stich dedicated là~erals into each one of . the sand intervals." - Mik Triolo, BP Exploration (Alaska) drilling engineer long-tenn well serviceability," he said. Well design evolved here The men said this is a slope-wide effort, with a slope-wide viscous team including SP, ConocoPhillips and ExxonMobil, working the viscous development issue, and contractors for the ftnns developing the technology being used. Triolo said that while the wcll design in use al Orion was evolved at OP, "we've also shared this well design with ConocoPhillips and so they're using it on their development," and ConocoPhillips is "Ieaming things over there that they're sharing with us," as part of the regional vis- cous team. ConocoPhiIlips operates the Kuparuk River unit viscous West Sak development effort. The quad multi-lateral has been drilled, and a quintuple multi-lateral is planncd for later this year, Triolo said, the first such well on the slope. That well, however, is nol planned with five junctions coming out li'OIn the main well bore, because "some of these sands are so thin that they cannot eco- nomically support the cost of a multi-later- al junction," so coilcd tubing technology will be used to do an open-hole junction. Four laterals will come otTlhe main well bore~ one of those laterals will split again. The whole well will be drilled with a rotalY rig, Triolo said, but will use some coiled-tubing developed technology, scaled up in size to rotary applications. Some of that technology was developed for usc over at Kuparuk, he said, so there is technology sharing among the di Oèrcnl drilling groups, as well as between l3P and ConoeoPhillips. Drilling, services and materials contrac- tors responsible for technology [or ßP's drilling program include: Uaker Hughes Inteq; Doyon Drilling; HallibUl10n; Nabors Drilling; Nordie Calista Drilling; Schlumbcrger; and WellTec Tractor. . ) STATE OF ALASKA ) ALASKA 01L AND GAS CONSERVATION COMIVII-=>SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD / GR / RES / Azimuthal DEN / NEU / AIM / PWD CASING, LINER AND CEMENTING RECORD :~~~1?If1~~\Q~~~f;lrøQ·'·li ;·i'S~'rf'~Ø:~t),~RW~~;1;\(~::il, ,;¡I,"'.:!'Rº~8:!I.:';;!I¡·'i ,~, .:·,"1'" m'a. ·oi~·'.""T'·" ,,'ð'Ii:\'I ."¡~'~'" ,.1 ~~ ('" 'I 'I "Q.. b·.'I~,·' '~'. I,I'¡'" ~,:,;-",tSM\ , "1·' :,,',1',1,1,,1. S·I":e',,~, ~...II ,11,11: .1.111" r71111·', ,11,',.,1., I'I;J'~,II,::~I,,~~VI ,"" 1',,:11,' I,·:, ,1,1, ,~I'IIIIIII"II ,""~I:IIIII.I~.' """ .' I" "~II',·I,I ,.II, I I ~ ,,·,,1 :II'III',:¡ Surface 108' Surface 108' 48" 260 sx Arctic Set (Approx.) 29' 3197' 29' 2642' 13-1/2" 630 sx AS Lite, 355 sx Class 'G' 27' 60251 27' 4431' 9-7/8" 613 sx Class 'G' 6020' 9846' 4429' 4424' 6-3/4" Uncemented Slotted Liner o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 105' NSL, 1660' WEL, SEC. 27, T12N, R11E, UM (OA) Total Depth: 2940' NSL, 730' EWL, SEC. 35, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583325 y- 5978321 Zone- ASP4 TPI: x- 585217 y- 5981129 Zone- ASP4 Total Depth: x- 587639 Y- 5978712 Zone- ASP4 18. Directional Survey 181 Yes 0 No 22. 20" x 34" 10-3/4" 7-5/8" 4-1/2" 215.5# 45.5# 29.7# 12.6# A53 L-80 L-80 L-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6090' - 9802' 4455' - 4428' 27. One Other 5. Date Comp., Susp., or Aband. 4/30/2004 6. Date Spudded 4/23/2004 7. Date T. D. Reached 4/26/2004 8. KB Elevation (ft): 78.7' 9. Plug Back Depth (MD+ TVD) 9860 + 4422 10. Total Depth (MD+ TVD) 9860 + 4422 11. Depth where SSSV set (Nipple) 2266' MD 19. Water depth, if offshore N/A MSL Revised: 07/28/04, Put on Production 1b. Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 12. Permitto Drill Number 204-049 13. API Number 50- 029-23202-62-00 14. Well Name and Number: PBU L-201L3 15. Field / Pool(s): Prudhoe Bay Field / Orion Ft Ft 16. Property Designation: ADL ADL 028238 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) ::'i~~Ò,\'\N:y¡:,:.' ,~I"'16~,,¡q;'I'¡:¡ :1'11·... 11'1',"Ii'\ULll¡;;1J .',1 SIZE 4-1/2", 12.6#, L-80 DEPTH SET (MD) 6000' PACKER SET (MD) 5873' 29. .'.'., "'. I..:'.·, '. '.,;,.., ',i:···...,:· li;,...,!.ijbrD;~iE~q~bRg';,ÓEM~ÑfsC1~ÊËz:E;EtC;':,' I '"',,, .,', ", '"" "'..,'~'I·' ,'~' ,,~ ,,', II' ".'", "I." ",', : ",;" .', I,"'· "",10'" "",,' ",,',',' I', I' ,. ,~, ,~,,', '," ,""., ,,',' ,,', " '", DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 150 Bbls of Diesel GAs-McF 51 W A TER-BBl 21 CHOKE SIZE GAS-Oil RATIO 75 249 Oil GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): June 28, 2004 Gas Lift Date of Test Hours Tested PRODUCTION FOR Oll-BBl 7/9/2004 2 TEST PERIOD -+ 203 Flow Tubing Casing Pressure CALCULATED ........ Oll-BBl Press. 70e 1,300 24-HoUR RATE"'" 2,432 None Form 10-407 Revised 12/2003 GAs-McF 607 W A TER-BBl 249 OR\G\NAL CONTINUED ON REVERSE SIDE RBDMS BFl JUt 2 9 Î,..r~!.¡ ~v 2~8. . ) 29. ) FORMATION TESTS GEOLOGIC MARKERS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OA 6048' 4441' None Schrader Bluff OA 9149' 4461' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~ J\A.l 0 \1u. ~ Title Technical Assistant Date b7.. ;tR-Ol( PBU L-201 L3 204-049 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Michael Triolo, 564-5774 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ) STATE OF ALASKA ) ALASKA ulL AND GAS CONSERVATION COMMI':>SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: II Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD / GR 1 RES / Azimuthal DEN / NEU / AIM / PWD CASING, LINER AND CEMENTING RECORD "~" .... .1' .:':',"', ."&~"ŒI,N?:Q~~~MI; ,,,ISE;TIINqpER;¡rHIWP,,,,,'I4Q,~E:::'·.·: ..1 G~QE,.' .:.1. .:·.:r;O~.:,'I", "BenQM.: ,'"' fep.."., :BO;:¡;~OM' ·'.'I.I''sIZE,:.:,'i, A53 Surface 108' Surface 108' 48" L-80 29' 3197' 29' 2642' 13-1/2" L-80 27' 6025' 27' 4431' 9-7/8" L-80 6020' 9846' 4429' 4424' 6-3/4" o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11 E, UM Top of Productive Horizon: 105' NSL, 1660' WEL, SEC. 27, T12N, R11E, UM (OA) Total Depth: 2940' NSL, 730' EWL, SEC. 35, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583325 y- 5978321 Zone- ASP4 TPI: x- 585217 y- 5981129 Zone- ASP4 Total Depth: x- 587639 y- 5978712 Zone- ASP4 18. Directional Survey II Yes 0 No 22. CASING SIZE 'I ' 20" x 34" 10-3/4" 7-5/8" 4-1/2" I::' :",,: I,; "':; ",,:,. ;'i I . VV:T~8ER FT", 215.5# 45.5# 29.7# 12.6# 23. Perforations op'en to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6090' - 9802' 4455' - 4428' 26. Date First Production: Not on Production Yet Date of Test Hours Tested One Other 5. Date Comp., Susp., or Aband. 4/30/2004 6. Date Spudded 4/23/2004 7. Date T.D. Reached 4/26/2004 8. KB Elevation (ft): 78.7' 9. Plug Back Depth (MD+TVD) 9860 + 4422 10. Total Depth (MD+TVD) 9860 + 4422 11. Depth where SSSV set (Nipple) 2266' MD 19. Water depth, if offshore N/A MSL 1b. Well Class: II Development 0 Exploratory o Stratigraphic Test 0 Service 12. Permit to Drill Number 204-049 13. API Number 50- 029-23202-62-00 14. Well Name and Number: PBU L-201 L3 15. Field / Pool(s): Prudhoe Bay Field / Orion Ft Ft 16. Property Designation: ADL ADL 028238 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) :~~Q4f';JJ;" ".'Rl:!iLl~ED' 260 sx Arctic Set (Approx.) 630 sx AS Lite, 355 sx Class 'G' 613 sx Class 'G' Uncemented Slotted Liner SIZE 4-1/2", 12.6#, L-80 DEPTH SET (MD) 6000' PACKER SET (MD) 5873' 25. ACID,F~CTbRE CEME~iSQ9EeZE, ETG: DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 150 Bbls of Diesel PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A Oll-Bsl CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). SUbmlf-~r~~Ç~B,~;,'~ none, state "none", R· E (~ E '\/E. 0 1 ,," . '-....... ".'«, ~ . -2'ï3~bL/ JUt-·1 2 ?004 ;;jf£ / RBOMS BfA. JUH @ 8 'lml" "0 - Ala~~.ka Oil 3: G;:~s Cons. CûHhnl$SI(m I1l1d,orage 0 RIG N A L PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED -.ar... Oll-Bsl Press. 24-HoUR RATE7 27, None Form 10-407 Revised 12/2003 GAs-McF W A TER-BSl GAs-McF W A TER-Bsl CONTINUED ON REVERSE SIDE CHOKE SIZE GAS-Oil RATIO Oil GRAVITY-API (CORR) Gç ) ) 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OA 6048' 4441' None Schrader Bluff OA 9149' 4461' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~ ~ ~ tiLl ~ Title Technical Assistant Date O(P ...o;¡ ..Dc.¡ PBU L-201 L3 204-049 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Michael Triolo, 564-5774 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 ... .-- ---- - -. .--- -- .- .-.. - . -. -. . -- -~.. --- - ..- - - -, . - -- .-. -. - ... --. BeuE~R6QR~ttON···· .. Leak-Off Test Summary . ~ - - . - . p:~gei1of 1· Legal Name: L-201 Common Name: L-201 Test Date Test Type Test Depth (TMD) Test Depth (TV D) AMW Surface Pressure Leak Off pressure'·(BHP) ·EMW 3/21/2004 LOT 3,197.0 (ft) 2,642.0 (ft) 9.20 (ppg) 575 (psi) 1,838 (psi) 13.39 (ppg) 3/27/2004 FIT 7,047.0 (ft) 4,673.0 (ft) 9.20 (ppg) 680 (psi) 2,913 (psi) 12.00 (ppg) 4/5/2004 FIT 6,372.0 (ft) 4,562.0 (ft) 9.20 (ppg) 665 (psi) 2,845 (psi) 12.01 (ppg) 4/14/2004 FIT 6,229.0 (ft) 4,514.0 (ft) 9.20 (ppg) 660 (psi) 2,817 (psi) 12.01 (ppg) -) 4/23/2004 FIT 6,025.0 (ft) 4,440.0 (ft) 9.30 (ppg) 646 (psi) 2,791 (psi) 12.10 (ppg) ..~ Printed: 5/312004 8:45:51 AM ') ) pagè 1·· of 34 BP EXPLORATIÖN· . ",' . ,. ." . ,"!.' ~ .. ..Jo. . _... '. Oper.atiøn~~umm·ary. Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours Task Code NPT Phase Description of .Opø~ations 3/16/2004 12:00 - 14:00 2.00 MOB P PRE Blow down steam and water lines. Rig down for move. Lay rig mats on L-201 14:00 - 15:00 1.00 MOB P PRE Move camps and pits. 15:00 - 16:00 1.00 MOB P PRE Move rig off of L-211 and position on L-201 RIG ACCEPTED @ 16:00 hrs 16:00 - 19:30 3.50 RIGU P PRE NU diverter, riser and Hydril. 19:30 - 21 :30 2.00 RIGU P PRE Level rig and pits 21 :30 - 00:00 2.50 RIGU P PRE RU pits. Position Swaco unit and cuttings tank. 3/17/2004 00:00 - 01 :00 1.00 RIGU P PRE Load BHA #1 in pipe shed. Continue NU diverter, riser and Hydril. 01 :00 - 04:30 3.50 RIGU P PRE Take on water and build spud mud. Change out riser 04:30 - 06:00 1.50 RIGU P PRE Change out top drive quill for 5" DP 06:00 - 07:00 1.00 RIGU P PRE PU Jewelry for BHA #1 07:00 - 10:30 3.50 RIGU P PRE MU 35 stands of 5" DP and stand back in derrick 10:30 - 12:00 1.50 RIGU P PRE MU HWDP and Collars, stand back in derrick. 12:00 - 17:30 5.50 RIGU P PRE Move 105 joints of 5" DP into pipe shed. MU 35 stands, stand back in derrick. 17:30 - 18:30 1.00 RIGU P PRE MU BHA #1 18:30 - 19:00 0.50 BOPSUF P PRE Function test diverter. Witness of diverter test waived by John Crisp with AOGCC. 19:00 - 19:30 0.50 RIGU P PRE Pre-spud meeting with Anadrill, MI, Sperry, GyroData and all rig personnel. 19:30 - 20:00 0.50 RIGU P PRE RU Sperry WL unit and GyroData for gyro surveys. 20:00 - 21 :00 1.00 RIGU P PRE Finish MU BHA #1. Orient motor and MWD 21 :00 - 21 :30 0.50 DRILL P SURF RIH and tag up at 108'. Fill stack. Circulate mud system checking for leaks. 21 :30 - 00:00 2.50 DRILL P SURF Drill 13-1/2" surface hole from 108' to 170'. RPM = 50 Torque = 1.7k FtLb GPM = 600 @ 500 psi P/U 55k SIO 51 k ROT 53k Run gyro survey every stand drilled. ART = 0.25 hrs SPUD @ 21 :30 3/18/2004 00:00 - 02:30 2.50 DRILL P SURF Drill 13-1/2" surface hole from 170' to 447'. Sliding 100% to build angle WOB = 2-20 klbs GPM = 600 - 1006 psi on Btm, 765 psi off Btm P/U 69k SIO 64k Run gyro surveys at 170',196' and 447' 02:30 - 03:30 1.00 DRILL P SURF Stand back 3 stands to PU Jar stand. RIH to 447' 03:30 - 14:00 10.50 DRILL P SURF Drill 13-1/2" surface hole from 447' to 1570'. Sliding as required to build angle and maintain azimuth. WOB = 30-35klbs RPM = 80 Printed: 51312004 8:46:01 AM BPEXPLORATION Operation~:..Sl.JlTtmå~Y:R.epørt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date., From:.. To Hours Task Code NPT Phase· Description·()t·Qp~ra.tions 3/18/2004 03:30 - 14:00 10.50 DRILL P SURF Torque off Btm = 2.3k FtLb, Torque on Btm = 7-9k FtLb GPM = 750 @ 2050 psi on Btm, 1570 psi off Btm P/U 87k S/O 80k ROT 82k 14:00 - 14:30 0.50 DRILL P SURF Circulate BU volume X 2 14:30 - 16:30 2.00 DRILL P SURF Monitor well - static. POH for new bit. started pulling over at 1100', pumped out to 950'. Stand back BHA and drop off UBHO sub. 16:30 - 17:00 0.50 DRILL P SURF PU new HTC 13-1/2" MX-C1. Clean rig floor. 17:00 - 18:30 1.50 DRILL P SURF RIH to 1478'. MU top drive and wash last stand to bottom at 1570'. 18:30 - 00:00 5.50 DRILL P SURF Drill 13-1/2" surface hole from 1570' to 2360'. Sliding as required to build angle and maintain azimuth. WOB = 30-35klbs RPM = 80 Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb GPM = 750 @ 2200 psi on Btm, 1820 psi off Btm P/U 100k SIO 84k ROT 90k P/U 104k SIO 89k No Pumps Backream each stand at drilling rate. Intermittent gas hydrates from 1900' to 2360' AST = 8.66 hrs. ART = 3.49 hrs. Formation tops: SV4 - 1829' MD Base of Permafrost - 1892' MD SV3 - 2306' MD SV2 - 2547' MD 3/19/2004 00:00 - 04:00 4.00 DRILL P SURF Drill 13-1/2" surface hole from 2360' to 3210'. Sliding as required to build angle and maintain azimuth. WOB = 35klbs RPM = 80 Torque off Btm = 5k FtLb, Torque on Btm = 8-10k FtLb GPM = 750 @ 2200 psi on Btm, 1990 psi off Btm P/U 114k SIO 88k ROT 100k Backream each stand at drilling rate. Intermittent gas hydrates. AST = 1.95 hrs. ART = 0.84 hrs Top of the SV1 @ 3050' MD 04:00 - 05:00 1.00 DRILL P SURF Circulate BU volume X 2. 770 gpm @ 2060 psi, reciprocate DP at 100 rpm. 05:00 - 08:00 3.00 DRILL P SURF Monitor well - static. POH on short trip to HWDP. Overpulls to 25 klbs at 2050', 1850-1800', 1450'. Work each spot & clean Printed: 51312004 8:46:01 AM ") .\ E3R:EXPLORAIfIPN ,. " ' ",' "', -, ',' "".., .,.... ····'.·º·p~·ra~·i,()º:$··..·S·lIri1...oo:~.ry:..·R~:pgr1,.·... . ..... \'." ' '."~' , . :", ~ <.' : :. ',':.;" .'. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES ., .", . ,. ,. , , , . . .. ...." "". ,···Ré19§ 3·9t$4 . \"';" . "",, '. '. ,,, ,',', " ,',; '.:. ".. ; ~ ..' ' :.'.:, '", :. ," ;"., .. ,,"':' . " . : Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Gode NPT 3/19/2004 05:00 - 08:00 3.00 DRILL P SURF 08:00 - 09:30 1.50 DRILL P SURF 09:30 - 12:00 2.50 DRILL P SURF 12:00 - 14:30 2.50 DRILL P SURF 14:30 - 15:30 1.00 DRILL P SURF 15:30 - 16:30 1.00 DRILL P SURF 16:30 - 17:00 0.50 DRILL P SURF 17:00 - 17:30 0.50 CASE P SURF 17:30 - 19:30 2.00 CASE P SURF 19:30 - 20:00 0.50 CASE P SURF 20:00 ~ 00:00 4.00 CASE P SURF 3/20/2004 00:00 - 01 :00 1.00 CASE P SURF 01 :00 - 01 :30 0.50 CASE P SURF 01 :30 - 02:00 0.50 CEMT P SURF 02:00 - 04:00 2.00 CEMT P SURF 04:00 - 04:30 0.50 CEMT P SURF 04:30 - 05:20 0.83 CEMT P SURF 05:20 - 05:40 0.33 CEMT P SURF 05:40 - 06:40 1.00 CEMT P SURF 06:40 - 07:00 0.33 CEMT P SURF 07:00 - 07:30 0.50 CEMT P SURF " " :."'- ':.:.,...::;.;'.,.....:' ',"':' ,': """. ':. ,':. . :.':''': '''.''.''..,..''.'..,...''-...;........,........,.'''''''''.,....,'..,."".,,,.."',,.......,,....,,. Ðèscriþtïohof0peráti~hS up - OK. Tight spot at 1400' - swabbing. Kelly up & circ @ 300 gpm/350 psi. Work up thru tight spot and precautionary circ up to 900' wi minor pulls. Continue POH to HWDP. RIH to bottom. Wipe minor tight spots at 1090' and 1300'-1500'. Circ last stand to bottom and cond mud for casing & cement- stage up to 770 gpm @ 2320 psi and 120 rpm. Reduce MW to 9.6 ppg & FV to 225. Monitor well· static. POH to run csg. Tight spot at 2032' - swabbing. MU top drive and circ @ 300 gpm/325 psi. Pump out to 2140'. POH to 1325', tight spot - swabbing. Work thru. POH with no more problems to HWDP. Monitor well at HWDP - static. Stand back HWDP, Jars and DC's LD BHA #2 Clean and clear rig floor. MU landing joint and make dummy run. RU csg equipment PJSM with MI, Nabors Casing and all rig personnel on running 10-3/4" surface casing. MU shoe track and test float equipment. Run 76 jts 10-3/4·, 45.5#, L-80, BTC surface casing. Taking weight at 1100' work through to 1200'. Break circulation on jt #40. Taking weight again from 1920' to 2500' then clear to bottom. 25 bow spring centralizers on the collars of jts #1 and #3 thru #26 Midnight depth - 2582' Continue running 10-3/4·, 45.5# surface casing. MU landing joint and land casing with shoe at 3197'. RD fill-up tool and blow down top drive. RU cement head. Circulate and condition hole for cement. Stage pumps to 10 bpm @ 760 psi. Reciprocate csg 5-10', P/U 152k Ibs S/O 96k Ibs. No losses. PJSM with OS, NAD, MI, Veco, BP prior to starting cement job. Air up & prime up cementers. Mix & pump 5 bbls CW100 preflush. Test lines to 3500 psi. Pump remaining 15 bbls CW100. Mix & pump 70 bbls Mudpush II spacer at 10.2 ppg. Release bottom plug. Mix & pump 480 bbls (605 sx) ArcticSet Lite slurry at 10.7 ppg - 8.5 bpm @ 390 psi. Switch to tail. Mix & pump 74 bbls (355 sx) Class G slurry at 15.8 ppg - 5 bpm @ 350 psi. Release top plug and kick out with 10 bbls water from cementers to clear lines. Switch to rig pumps and displace with mud at 12 bpm @ 800 psi. Getting good cement returns to surface 2000 strokes into displacement. Reciprocated pipe while pumping cement and 205 bbls into displacement - then landed on ring for remainder of job. Slow to 3 bpm for last 15 bbls displacement. Bump plug with Printed: 51312004 8:46:01 AM Page 4 of 34 BP . EXPLORATION .;. ()peratiºnsSYl11l1)ary~eport. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date From-To :hlOlJfS Task Code NPT Phase 3/20/2004 07:00 - 07:30 0.50 CEMT P SURF 07:30 - 08:00 0.50 CEMT P SURF 08:00 - 14:00 6.00 DIVRTR P SURF 14:00 - 20:30 6.50 BOPSUP P SURF 20:30 - 21 :00 0.50 BOPSUP P SURF 21 :00 - 00:00 3.00 BOPSUP P SURF 3/21/2004 00:00 - 00:30 0.50 BOPSUP P SURF 00:30 - 01 :00 0.50 BOPSUF P SURF 01 :00 - 03:30 2.50 DRILL P INT1 03:30 - 05:00 1.50 DRILL P INT1 05:00 - 06:00 1.00 CASE P SURF 06:00 - 07:30 1.50 DRILL P INT1 07:30 - 09:00 1.50 DRILL P INT1 09:00 - 10:00 1.00 DRILL P INT1 10:00 - 11 :00 1.00 DRILL P INT1 11 :00 - 12:30 1.50 DRILL P INT1 12:30 - 13:00 0.50 DRILL N FLUD INT1 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description··o.t··Qperations 1500 psi at 299.6 bbls total displacement. Bleed off pressure - floats holding. Full returns throughout pumping and displacing cement. Got back 125 bbls good lead slurry. CIP at 07:30 hrs on 3/20104. Flush flow line and stack. Blow down and RD cement lines. RD cement head. Break out and LD landing joint. ND diverter, riser and HydriL Move diverter line out of cellar. NU speed head, tbg spool and BOP. 15:30 hrs - take on new 9.2# LSND mud PJSM with all rig personnel on testing BOPE Test BOPE to 250/3500 psi. Test annular to 250/3500 psi. Witness of BOP test waived by Jeff Jones with AOGCC. Continue testing BOPE 250/3500 psi Pull test plug and install wear bushing. RD test equipment. PU BHA #3,9-7/8" directional drilling assembly. Shallow test MWD. RIH to 2834' Test 10-3/4" 45.5# casing to 3500 psi for 30 minutes. Cut and slip 52' of drilling line. Service top drive. Wash down from 2834', tag float collar at 3110'. Drill shoe track and rat hole to 3210', continue drilling 20' of new hole to 3230' RPM = 50 Torque = 7k FtLb GPM = 580 @ 1360 psi ROT 97k Displace well to new 9.1 ppg LSND mud. RPM = 50 GPM = 50 @ 1300 psi ROT 97k Perform LOT, EMW = 13.3 ppg. 575 psi surface pressure with 9.1 ppg mud at 2642' TVD. Calculated kick tolerance 149 bbls Establish baseline ECD = 9.67 ppg Drill 9-7/8" intermediate hole from 3230' to 3496', rotating 100% WOB = 20 klbs RPM = 80 Torque off Btm = 4.6k FtLb, Torque on Btm = 6-7k FtLb GPM = 600 @ 1520 psi on Btm, 1190 psi off Btm P/U 115k S/O 85k ROT 98k Backream every stand at 600 gpm and 80 rpm, reducing flow rate to 420 gpm on down stroke. Calculated ECD = 9.66 ppg, Actual ECD = 10.30 ppg POH 3 stands to shoe. Skakers blinding off apparently due to oil wetting of bentonite in new LSND mud. Blinding off of shakers required pump rate reductions, unable to drill ahead. Printed: 5/312004 8:46:01 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To . Hours Task Code NPT Phase Description of Ope~tio.ns 3/21/2004 13:00 - 17:00 4.00 DRILL N FLUD INT1 Circulate and condition mud at 50 gpm. Screened down shakers and circulated until the blinding problem was eliminated. Able to screen back up and circulate at drilling rate 17:00 - 17:30 0.50 DRILL N FLUD INT1 RIH to 3400', wash to bottom at 3496' 17:30 - 18:30 1.00 DRILL P INT1 Stage up pumps and drill from 3496' to 3683'. WOB = 15 klbs RPM = 80 Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm P/U 117k S/O 90k ROT 105k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg 18:30 - 19:30 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure on the top drive lube pumps. Change out filter, regained oil pressure. 19:30 - 20:30 1.00 DRILL N RREP INT1 RIH to 3589', wash to bottom at 3683' 20:30 : 21 :00 0.50 DRILL N INT1 Stage up pumps and drill from 3683' to 3776'. WOB = 15 klbs RPM = 80 Torque off Btm = 6k FtLb, Torque on Btm = 8-9k FtLb GPM = 650 @ 1960 psi on Btm, 1360 psi off Btm PIU 117k S/O 90k ROT 105k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.00 ppg, Actual ECD = 10.32 ppg AST = 0.23 hrs. ART = 1.08 hrs. 21 :00 - 22:00 1.00 DRILL N RREP INT1 POH to shoe. Lost oil pressure in the top drive lube pump again. 22:00 - 00:00 2.00 DRILL N RREP INT1 Change out top drive lube pump. 3/22/2004 00:00 - 01 :00 1.00 DRILL N RREP INT1 Continue change out top drive lube pump. 01 :00 - 01 :30 0.50 DRILL N RREP INT1 RIH to 3686', wash last stand to bottom at 3776' 01 :30 - 00:00 22.50 DRILL P INT1 Stage up pumps and drill from 3776' to 5844'. Sliding as required to maintain inclination and azimuth. WOB = 15 klbs RPM = 80 Torque off Btm = 6-7k FtLb, Torque on Btm = 8-16k FtLb GPM = 650 @ 2060 psi on Btm, 1735 psi off Btm P/U 148k S/O 110k ROT 130k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Printed: 51312004 8:46:01 AM BP EXPLORATION Opera1ionsSum maryBepprt F»ftge.6of34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From-To Hours Task Code NPT Phase .... Description()fgper~~iºf")~· 3/22/2004 01 :30 - 00:00 22.50 DRILL P INT1 Calculated ECD = 9.87 ppg, Actual ECD = 10.00 ppg AST = 5.89 hrs. ART = 3.89 hrs. Formation tops: UG1 4775' MD, 3674' TVD Ma 5300' MD, 4020' TVD 3/23/2004 00:00 - 17:00 17.00 DRILL P INT1 Directional drill from 5844' to 7055'. Sliding as required to maintain inclination and azimuth. WOB = 20-25 klbs RPM = 80 Torque off Btm = 7-8k FtLb, Torque on Btm = 8-10k FtLb GPM = 650 @ 2230 psi on Btm, 1993 psi off Btm P/U 147k S/O 106k ROT 125k Backream every stand at 650 gpm and 80 rpm, reducing flow rate to 450 gpm on down stroke. Calculated ECD = 10.02 ppg, Actual ECD = 10.37 ppg AST = 1.88 hrs. ART = 9.32 hrs. Formation Tops: OA 6048' MD 4441' TVD OBa 6227' MD 4513' TVD OBb 6372' MD 4560' TVD OBd 6996' MD 4664' TVD 17:00 - 19:00 2.00 DRILL P INT1 Circulate BU vol X 2, 670 gpm @ 2106 psi, reciprocate DP at 120 rpm. Calculated ECD = 10.02 Initial ECD = 10.42 ECD prior to POH = 10.19 19:00 - 20:00 1.00 DRILL P INT1 Monitor well - static. POH 15 stands to 5751', no problems P/U 155k S/O 105k no pumps 20:00 - 21 :30 1.50 DRILL P INT1 Pump dry job and continue POH. Attempting to swab at 3451', RIH to 3655' 21 :30 - 00:00 2.50 DRILL P INT1 Stage up pumps and begin backreaming from 3655'. Backream out to 3451, attempting to pack off. RIH 1 stand to 3544'. Attempt to backream, still packing off. RIH another stand to 3683', bring pumps up to 600 gpm watching for ECD spikes. Able to circulate no problem, start backreaming out from 3683' 600 gpm @ 1247 psi and 85 rpm Midnight depth 3582' 3/24/2004 00:00 - 00:30 0.50 DRILL P INT1 Continue backreaming out from 3582' to csg shoe at 3197'.600 gpm @ 1250 psi and 90 rpm 00:30 - 01 :00 0.50 DRILL P INT1 Pump hi-vis sweep around at csg shoe. 600 gpm @ 1200 psi Printed: 5/312004 8:46:01 AM I, ') ") ....".','. :"-, ;i~,::·; :. BRIEXP~QRA+IQN :. .Q·p~råtion$· št)nlrriåty:B'~pºli:¡.:..·. - '," .,' ',.' , ',." ".,.\.,"", ','-....: . \: :." :': ~. ,?> . .'-. "'. :."..~ : . . ·,::.i';:··..,:· . ·····.··..¡·1'· Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date ::':':'..:';:':.::.;,::,',:':,.\,::.... From-To Hours Task Code NPTPhase 3/24/2004 0.50 DRILL P INT1 00:30 . 01 :00 01 :00 - 01 :30 0.50 DRILL P INT1 01 :30 . 03:30 2.00 DRILL P INT1 03:30 - 05:30 2.00 DRILL P INT1 05:30 - 06:30 1.00 DRILL P INT1 06:30 - 11 :00 4.50 DRILL P INT1 11 :00 : 12:00 1.00 DRILL P INT1 12:00 - 12:30 0.50 DRILL P INT1 12:30 - 15:00 2.50 DRILL P INT1 15:00 - 15:30 0.50 DRILL P INT1 15:30 - 16:30 1.00 BOPSUP P INT1 16:30 - 18:00 1.50 BOPSUP P INT1 18:00 - 20:00 2.00 CASE P INT1 20:00 - 20:30 0.50 CASE P INT1 20:30 - 00:00 3.50 CASE P INT1 3/25/2004 00:00 - 01 :30 1.50 CASE P INn 01 :30 - 02:00 0.50 CASE P INT1 02:00 - 12:00 10.00 CASE P INT1 12:00 - 12:30 0.50 CEMT P INT1 12:30 - 14:00 1.50 CEMT P INT1 14:00 -14:30 0.50 CEMT P INT1 14:30 - 17:00 2.50 CEMT P INn Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 ,,', . , . ",',:. ':".,..:..'", ',-, ,:."",-;,;,.," .......:..:...'.... ·ÒèSCriptio~·ór·åpe~t¡g~·;··;····· and 80 rpm Calculated ECD = 9.86 Actual ECD = 9.94 Service top drive RIH to 7055, wash last stand down. No problems on RIH. P/U 115k SIO 90k Stage up pumps and circulate BU volume X 3. Circulate lo-hi vis sweep surface to surface. 670 gpm @ 200 psi and 120 rpm. P/U 147k SIO 106k ROT 125k Torque = 10k FtLb Calculated ECD = 9.93 ECD prior to POH = 10.03 MOnitor well - static. POH 10 stands to 6125'. P/U 165k SIO 100k Slug DP and continue POH laying down 5" DP. RIH with 11 stands 5" DP from derrick Continue LDDP PJSM with Anadrill and all rig personnel on removing RA source and laying down BHA. LD BHA #3, remove source from ADN. Clean and clear rig floor. Flush stack and pull wear bushing. Change top rams to 7-5/8". Install test plug and test door seals to 3500 psi. MU landing joint and make dummy run. RU 7-5/8" csg equipment. PJSM with Nabors Casing, MI and all rig personnel on running 7-5/8" csg. MU and test float equipment. RUN 7-5/8", 29.7#, L-80, BTC-M intermediate csg as per running orders. Midnight depth 1696' Continue Run 7-5/8", 29.7#, L-80 csg from 1696' to 3197' at 1 minute per jt. Break circulation every 20 jts. Circulate 1.5 X csg vol at the 10-314" csg shoe. 7 bpm @ 350 psi. P/U 120k SIO 100k no pumps Continue running 7·5/8" csg into open hole. 1 minutefJt above 5000', 1.5 minutef¡t below 5000'. Fill every jt, break circulation every 5 jts, circulate for 15 minutes every 15 jts. and CBU every 30 jts. Good displacement, no losses while running csg. RD fill-up tool. RU cement head. Stage up pumps and circulate and condition hole. Max rate 7 bpm @ 502 psi Reciprocate DP. P/U 225k SIO 110k PJSM with Schlumberger, MI and all rig personnel on cementing 7·5/8" csg. Air up and batch up cementers. Pump 5 bbl CW-100. Test lines to 3500 psi, pump remaining 20 bbls CW-100. Pump 45 Printed: 5/312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: BP EXPLORATION Op~r~ti9ns SumlTlêJryReport Page 8 of 34 L - 201 L -201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES 3/25/2004 14:30 - 17:00 From .'" To Hours Task Code NPT INT1 17:00 - 18:00 3/26/2004 18:00 - 19:30 19:30 - 20:00 20:00 - 22:00 22:00 - 00:00 00:00 - 13:00 13:00 - 14:00 14:00-15:00 2.50 CEMT P 1.00 CEMT P INT1 1 .50 CASE P 0.50 WHSUR P 2.00 CEMT P 2.00 CEMT P 13.00 CEMT P INT1 INT1 INT1 INT1 INT1 1.00 BOPSUF P 1.00 WHSUR P INT1 INT1 15:00 - 19:30 4.50 BOPSUF P INT1 19:30 - 20:30 1.00 BOPSUF P INT1 20:30 - 22:00 1.50 BOPSUF P INT1 22:00 - 00:00 2.00 DRILL P PROD1 3/27/2004 00:00 - 01 :00 1.00 DRILL P PROD1 01 :00 - 04:30 3.50 DRILL P PROD1 04:30 - 05:00 0.50 DRILL P PROD1 05:00 - 07:30 2.50 DRILL P PROD1 07:30 - 09:00 1.50 CASE P INT1 09:00 - 11 :30 2.50 DRILL N WAIT PROD1 11 :30 - 13:00 13:00 - 14:00 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of ºp~rªti()p§ bbls 10.5 ppg Mud push. Drop bottom plug and pump 126 bbl (589 sxs) 15.8 ppg Class-G cement. Drop top plug and kick out with 10bbls water from cementers to wash up lines. Switch to rig pumps and displace with seawater at 7 bpm, ICP = 117 psi. Slow rate to 3 bpm to bring mud push around the shoe then increase rate back to 7 bpm. Able to reciprocate casing throughout cement job, land csg 290 bbls into displacement. Slow rate to 3 bpm for the last 20 bbls of displacement, FCP = 750 psi. Bump plugs with 1000 psi on calculated strokes, floats holding. CIP 17:45 RD cement head. LD landing joint and RD csg equipment. RILDS on packoff. Test packoff to 5000 psi. change top drive quill to 4" HT -40, change out bails. Clean mud and cement out from under rotary table. PJSM with all rig personnel. Install wear bushing. PU 4" DP, stand stands back in derrick. RU and inject 130 bbls 9.3 ppg mud down the 10-3/4" X 7-5/8" annulus. Lot EMW = 13.5 ppg, 580 psi surface pressure and a shoe TVD of 2642'. 3bpm ICP = 620 psi FCP = 550 psi SIP = 400 psi Change top rams to 3-1/2" X 6" variables RU Little Red, Test lines to 3500 psi. Inject 91 bbls dead crude down 10-314" X 7-5/8" annulus. ISP = 625 psi FCP = 890 psi SIP = 672 psi RU and test BOPE 250/3500 psi. Witness of BOP test waived by Chuck Sheave with AOGCC. Pull test plug. RD test equipment. Install wear bushing. PJSM with all rig personnel. Cut and slip 91' of drill line. Service top drive, blocks and crown. PU and MU BHA #4, 6-3/4" directional assembly. Continue PU and MU BHA #4 RIH, picking up single joints of DP, to 4000'. Function test MWD. Continue RIH, picking up single joints of DP to 6892'. Wash down and tag cmt at 6933'. RU and test 7-5/8" csg to 3500 psi for 30 minutes. Waiting on trucks for MOBM displacement. Pull 9 stands of DP, Move 4" HT-40 HWDPin derrick to access 4" HT-38 HWDP. RIH with 4" HT-38 HWDP, POH Laying down. RIH with 4" HT-40 HWDP. PROD1 Pump 40 bbl MOBm spacer. Displace well to 9.2 ppg MOBM. 286 gpm @ 2500 psi. PROD1 Drill shoe track, rathole and 20' of new hole to 7075'. 1.50 DRILL P 1.00 DRILL P Torque off Btm = 3k FtLb, Torque on Btm = 4k FtLb GPM =286 @ 2620 psi on Btm, 2500 psi off Btm Printed: 5/312004 8:46:01 AM - ) ) BPE><f?L..QRAI·l(::ltN .. . . ': , , ".·.:,~,:,-:,i : ::" ,'. '", .", ·>'9perations. Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Hours . Task Code NPT . Phase 3/27/2004 13:00 - 14:00 1.00 DRILL P PROD1 14:00 - 14:30 0.50 DRILL P PROD1 14:30 - 15:30 1.00 DRILL P PROD1 Description of Operations CBU 286 gpm @ 2500 psi Perform 12.0 ppg EMW FIT. 680 psi, 9.2 ppg MOBM, 4673' TVD. 15:30 - 18:00 2.50 DRILL P Establish baseline ECD's ECD = 10.23 PROD1 Directional drill from 7075' to 7358', sliding as required to build angle and azimuth. 18:00 - 18:30 0.50 STKOH C WOB = 5-15 klbs RPM = 60 GPM = 280 @ 2900 psi on Btm, 2680 psi off Btm PROD1 POH from 7358' to 7130' for geologic plug back. 21 :00 - 00:00 3.00 DRILL P Well landed for horizontal section 6' TVD high to plan. Estimated formation dip in prognosis -2 degrees, actual formation dip <1 degree. The combination of these would have resulted in the loss of the entire lower OBd sand. Town engineering and geology staff were consulted and the decision was made to open hole sidetrack at 7130'. PROD1 Trench for sidetrack at 150 degrees right. Trench and drill from 7130' to 7358'. PROD1 Directional drill from 7358' to 7555', sliding as required to build angle and azimuth. 18:30 - 21 :00 2.50 STKOH C WOB = 5-15 klbs RPM = 65 Torque off Btm = 4.4k FtLb, Torque on Btm = 5.5k FtLb GPM = 280 @ 2750 psi on Btm, 2430 psi off Btm P/U 135k 8/0 82k ROT 104k P/U 135k S/O 90k No pumps Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.22 ppg, Actual ECD = 10.77 ppg 3/28/2004 00:00 - 11 :00 11.00 DRILL P AST = 1.63 hrs. ART = 1.57 hrs. PROD1 Directional drill from 7555' to 8280', sliding as required to maintain angle and azimuth. WOB = 8-15 klbs RPM = 65 Torque off Btm = 5.4k FtLb, Torque on Btm = 6.5k FtLb GPM = 280 @ 3100 psi on Btm, 2564 psi off Btm P/U 134k S/O 83k ROT 108k PIU 143k 8/0 92k No pumps Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Printed: 51312004 8:46:01 AM BP EXPLORATION {)peratï'ons sulTÌtn..ªtVf.Îe,p()rt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L -201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From-To Hours Task Codè NPT Phase Ðescription·:of·Øperéltiºrì~ 3/28/2004 00:00 - 11 :00 11.00 DRILL P PROD1 Calculated ECD = 10.55 ppg, Actual ECD = 11.13 ppg 11 :00 - 11 :30 0.50 DRILL P PROD1 Service #2 mud pump, loose cable on traction motor 11 :30 - 14:30 3.00 DRILL P PROD1 Directional drill from 8280' to 9093', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 5.9k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 2950 psi on Btm, 2510 psi off Btm P/U 141k SIO 79k ROT 107k P/U 150k SIO 88k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.61 ppg, Actual ECD = 10.90 ppg 14:30-15:30 1.00 DRILL P PROD1 Circulate and condition while correlating geologic data. 280 gpm @ 2510 psi and 70 rpm 15:30 - 21 :30 6.00 DRILL P PROD1 Directional drill from 9093' to 9870', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 6.5k FtLb, Torque on Btm = 7.7k FtLb GPM = 280 @ 3150 psi on Btm, 2614 psi off Btm P/U 148k S/O 69k ROT 107k P/U 157k SIO 80k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.66 ppg, Actual ECD = 11.24 ppg AST = 3.03 hrs. ART = 4.92 hrs. 21 :30 - 00:00 2.50 DRILL P PROD1 Condition hole for wiper trip to 7-5/8" csg shoe. Circulate BU volume X 2. Pump 10 bbl base oil sweep surface to surface. Circulate until ECD within 0.3 ppg of calculated. 296 gpm @ 2830 psi and 70 rpm Calculated ECD = 10.37 ECD prior to wiper trip = 10.56 3/29/2004 00:00 - 01 :30 1.50 DRILL P PROD1 Monitor well- static. POH on wiper trip to 7-5/8" csg shoe. No problems 01 :30 - 17:00 15.50 DRILL N RREP PROD1 PJSM with all rig personnel. Change out top drive wash pipe and upper rotary seals. 17:00 - 17:30 0.50 DRILL P PROD1 Service top drive and blocks 17:30 - 19:30 2.00 DRILL P PROD1 RIH, work through tight spots at 8575' and 9230'. Wash last stand to bottom at 9870' 19:30 - 20:00 0.50 DRILL P PROD1 Stage pumps to drilling rate, 280 gpm @ , and CBU Printed: 5/312004 8:46:01 AM ') ) , ·.t·[2R EXPI..Q.Ft~TI ON ........ '.>' ~: .,'. ',,: " , ."", " , . . ., ,',. , .. . . . ." '. . . ····;·..:·çip.e.rª~.i'()o.~,···..$.ø·.rn.m'~.ry·..m~.pºrt..·. ···Rag~;~rJ,:9f..3~ "'. "':;',,:'::1 ":.:,.:,¡,;',.:.,, .. :":1 .' ". ,',.. : ,'. '~~: ..,:'; ; '. " :,0 :"'~ .: ':"': -:: . i' : .,,~~. :::\.,: :.: . :; Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 ·>[j)él.té:,':'h;':Frô'rri;';';'Tfö", HoUrs >Task Code· NPT· pliasë ·[)èáö;iþti'~nofÔÞ'ê'~~hd;'~ ," '."" 3/29/2004 20:00 - 00:00 4.00 DRILL P PROD1 Directional drill from 9870' to 10057', sliding as required to maintain angle and azimuth. WOB = 8-12 klbs RPM = 70 Torque off Btm = 6.6k FtLb, Torque on Btm = 7.5k FtLb GPM = 280 @ 3160 psi on Btm, 2660 psi off Btm P/U 146k 8/080k ROT 107k P/U 156k SIO 84k No pumps Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Calculated ECD = 10.49 ppg, Actual ECD = 11.04 ppg 3/30/2004 00:00 - 10:00 10.00 DRILL P A8T = 0.56 hrs. ART = 0.34 hrs. PROD1 Drill 6-3/4" directional hole from 10057' to 11364', sliding as required to maintain angle and azimuth. WOB = 10-12 klbs RPM = 75 Torque off Btm = 7.9k FtLb, Torque on Btm = 9.0k FtLb GPM = 280 @ 3600 psi on Btm with 500 psi differential pressure P/U 154k 8/0 62k ROT 100k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 10:00 -10:30 0.50 DRILL P Calculated ECD = 10.72 ppg Actual ECD = 11.7 ppg PROD1 Circulate to reduce ECD. Riciprocate & rotate (75 rpm) drill string wihile circulating with 280 gpm @ 3050 psi. ECD after Circulating = 11.32 ppg PROD1 Drill 6-3/4" directional hole from 11364' to 11642', sliding as required to maintain angle and azimuth. 10:30 - 12:30 2.00 DRILL P WOB = 10-12 klbs RPM = 75 Torque off Btm = 7.9k FtLb, Torque on Btm = 9.0k FtLb GPM = 280 @ 3600 psi on Btm with 500 psi differential pressure P/U 154k S/O 62k ROT 100k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. 12:30 - 14:00 14:00 - 16:00 1.50 DRILL P 2.00 DRILL P Calculated ECD = 10.72 ppg Actual ECD = 11.82 ppg PROD1 Circulate @ 11642' while evaluating geological well data. PROD1 Drill 6-3/4" directional hole from 11642' to 11831', sliding as required to maintain angle and azimuth. WOB = 10-12 klbs Printed: 51312004 8:46:01 AM Page 12 of34 BP EXPLOBA TION Qperati()ns SU01maryReport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 3/30/2004 14:00 - 16:00 16:00 - 19:00 L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Hours · Task c;ode NPT Phase 2.00 DRILL P PROD1 3.00 DRILL P PROD1 19:00 - 20:00 1.00 DRILL P PROD1 20:00 - 21 :30 1.50 DRILL P PROD1 21 :30 - 22:00 0.50 DRILL P PROD1 22:00 - 00:00 3/31/2004 00:00 - 02:30 2.00 DRILL N DFAL PROD1 2.50 DRILL N DFAL PROD1 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Dª~cript¡pn of qþªrª~ions RPM = 75 Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3290 psi on Btm with 280 psi differential pressure P/U 151k S/O 60k ROT 104k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg Circulate & condition mud/hole for wiper trip. Circulate until ECD within 0.3 ppg of calculated. 280 gpm @ 2890 psi and 75 rpm Calculated ECD = 10.78 ppg ECD prior to wiper trip = 11.08 POOH for wiper trip from 11831' to 9590' (24 Stds) with no problems. Hole in good condition. Max drag 15k. TIH to 11736' with no problems. M/U TDS. Establish circulation. Precautionary wash & ream to bottom with no problems. No fill on bottom. Drill 6-3/4" directional hole from 11831' to 11856', sliding as required to maintain angle and azimuth. Had a fair amount of drill cuttings come over shakers on bottoms up from wiper trip. Note: Gamma-Ray tool generating incorrect data. WOB = 10-12 klbs RPM = 75 Torque off Btm = 7.0k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3290 psi on Btm with 280 psi differential pressure P/U 151k S/O 60k ROT 104k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.78 ppg Actual ECD = 11.31 ppg Drilling Time last 24 Hrs= 5.68 hrs ART = 3.12 Hrs AST = 2.56 Hrs. Survey & Connection time = 8.82 Hrs Circulate while trouble shooting problem with MWD-GR tool. Backream up one stand to correlate MWD data. Gamma Counts prior to having problem was reading 80 CPS. Currently reading 10 CPS. Unable to rectify MWD-GR tool problem. Failure unknown at this time. Circulated 2 x bottoms-up from 11856' @ 280 gpm with 2880 psi. Calculated ECD =10.85 ppg Actual ECD after circulating = 11.06 ppg POOH (Due to MWD tool failure) to 7-5/8" casing shoe with no problems. Hole in good condition. Flow check @ shoe. Well Printed: 5/312004 8:46:01 AM ) ) :. ,.,.".:.' .:.,~"",. , .. . e~gg,;~.·a:Qt~:?t.·.·. .' '. ,·····;¡·'I3R:·,EXPL.0BATION..·········· :"":':-'.:,:"..'.',',:'.,;;,":;.:...',,,,',:., ',' .,-':.:. :-':.:': ,',,, ,". ,:'.', ... ,., ". ..... ,",. ..,', . .. < ",:.";:¡ . ". ,'" ',": ,,": ,',.' " ,,'. ,'" ",' . " ., :' , '" . ;op~r,~Hons'sÙmli1åry'Repårt' . .' ".;' ~ . Drilling Time last 24 Hrs= 2.15 hrs ART = 1.08 Hrs AST = 1.07 Hrs. Survey & Connection time = 2.85 Hrs PROD1 Circulate @ 12327' while evaluating geological well data. Note: Due to a unaccceptable amount of pay zone drilled, a decision was made by the BP Drilling department to perform a Open Hole sidetrack at 10585' MD. Circulate hole clean (2 x Btm-up vol) with 280 gpm @ 2870 psi. Reciprocate & rotate drill string (75 RPM) while circulating. ECD after circulating: Calculated ECD = 10.90 Actual ECD = 11.20. P/U 155k S/O 59k Rot Wt 103k Flow check. Well static. Blow down TDS. POOH for Open-hole Sidetrack from 12327' to 11453'-midnight depth. Hole in good shape. Max drag 15k. POOH from 11453' to 10565' for Open-hole Sidetrack. Hole in good shape. Max drag 15k. Break circulation. Stage pumps to 280 gpm wI 2730 psi. Orient TF to 140 deg lHS for Open Hole Sidetrack. Start trenching from 10565' to 10585'. NOTE: AIM tool quit working. Circulate & work drill string @ 10585' while trouble shooting problem with AIM Tool. Unable to rectify problem. .. ' ..... .', ,':~ <: c,;: :: . "" Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES f~purs Task Code· NPT Phase 3/31/2004 00:00 - 02:30 2.50 DRILL N DFAL PROD1 02:30 - 05:00 2.50 DRILL N DFAL PROD1 05:00 - 05:15 0.25 DRILL N DFAL PROD1 05: 15 - 07:00 1.75 DRILL N DFAL PROD1 07:00 - 07:30 0.50 DRILL N DFAL PROD1 07:30 - 07:45 0.25 DRILL N DFAL PROD1 07:45 - 09:30 1.75 DRilL N DFAL PROD1 09:30 - 12:00 2.50 DRILL N DFAL PROD1 12:00 - 13:00 1.00 DRILL N DFAL PROD1 13:00 - 15:00 2.00 DRILL N DFAL PROD1 15:00 - 16:00 1.00 DRILL N DFAL PROD1 16:00 - 21 :00 5.00 DRILL P PROD1 21 :00 - 23:30 2.50 DRILL C 23:30 - 00:00 0.50 DRilL C PROD1 4/1/2004 00:00 - 00:30 0.50 DRILL C PROD1 00:30 - 01 :30 1.00 STKOH C PROD1 01 :30 - 02:30 1.00 STKOH X DFAl PROD1 :. ""~,,: :,: " .. ...':,..... ':,'. ','. '."'.'"..", ¡,:{:~: !:;·Ak:~,j}?~¡:;:;·~/!F;,::::: ::'.': ~ .,.,', ;,:.\:X<H,::j~~n;~;~;;,; :": ',,:.~, :',: :':"::": : :,,~. Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operation~,·" static. Continue POOH with drill string to top of BHA. SAFETY --- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Stand back Jars & NMDC's. Unload RA Source from LWD. UD MWD-LWD tool. Check mud-motor & bit (Bit in like new condition). Down-load MWD. Clean Rig Floor. SAFETY --- Held PJSM with Anadrill and all Rig personnel regarding picking up BHA & loading RA source. M/U 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK. TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7032'. Service TDS. Slip & cut 78' of Drill Line. Reset & check C-O-M. Check brake system. Continue TIH to 11600' with no problems. M/U TDS. Establish circulation. Stage pumps to 280 gpm with 2520 psi + 70 rpm. Perform MADD PASS from 11600'-11856'. Drill 6-3/4" directional hole from 11856' to 12327', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 75 Torque off Btm = 8.0k FtLb, Torque on Btm = 10k FtLb GPM = 280 @ 3480 psi on Btm with 200 psi differential pressure P/U 155k S/O 59k ROT 103k Backream every stand at 280 gpm and 75 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.90 ppg Actual ECD = 11.39 ppg Printed: 51312004 8:46:01 AM BPEXPLORATION Op~rations·SummaryR~port Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Date From-To Hours Task Gode ·NPT Phase 4/1/2004 02:30 - 04:00 1.50 STKOH X DFAL PROD1 04:00 - 06:30 2.50 STKOH X DFAL PROD1 06:30 - 06:45 0.25 STKOH X DFAL PROD1 06:45 - 09:00 2.25 STKOH X DFAL PROD1 09:00 - 14:00 5.00 BOPSUPX DFAL PROD1 14:00 - 14:15 0.25 STKOH X DFAL PROD1 14:15 - 15:30 1.25 STKOH X DFAL PROD1 15:30 . 18:00 2.50 STKOH X DFAL PROD1 18:00 - 19:30 1.50 STKOH X DFAL PROD1 19:30 - 21 :00 1.50 STKOH X DFAL PROD1 21 :00 - 21 :30 0.50 STKOH X DFAL PROD1 21 :30 - 00:00 2.50 DRILL C PROD1 4/212004 14.42 STKOH C 00:00 - 14:25 PROD1 Page 140f~4 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Descripti()Q.Qfgperªíiqpê POOH from 10585' to 7-5/8" Casing Shoe @ 7047' with no problems. Hole in good condition. Flow check @ shoe. Well static. Continue POOH from 7047' to top of BHA. SAFETY --- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Stand back Jars & NMDC's. Remove RA Source. UD MWD-LWD tool, mud-motor & bit (Bit in good condition). Held PJSM. Pull wear bushing. Run BOP Test Plug on 4" DP. Rig Up Testing Equipment - Test BOP & Related Surface Equipment: Test Annular, Upper And Lower Pipe Rams, Blind Rams, Manual & HCR Valves on C/K Lines, Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. Perform Accumulator Test. Blow down lines. Rig Down testing Equipment The BOP Test witnessed By AOGCC Inspector John Crisp. SAFETY --- Held PJSM with Anadrill and all Rig personnel regarding picking up BHA & loading RA source. M/U 6-314" Steerable Drilling assembly (BHA #6). Shallow test MWD-OK. TIH with 6-3/4" Steerable Drilling assembly on 4" DP to 7-5/8" Casing Shoe @ 7047'. Service TDS. Slip & cut 37' of Drill Line. Reset & check C-O-M. Check brake system. Continue TIH to 10522' with no problems. M/U TDS. Establish circulation. Stage pumps to 280 gpm with 2820 psi. Wash down to 10565'. Orient TF to 140 deg LHS for Open Hole Sidetrack 02. Trench from 10565' to 10585'. Sidetrack well & Drill 6-314" directional hole from 10585' to 10615', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 6.0k FtLb, Torque on Btm = 7k FtLb GPM = 280 @ 2820 psi on Btm with 100 psi differential pressure P/U 153k S/O 83k ROT 105k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.00 ppg Actual ECD = 10.96 ppg Drilling Time last 24 Hrs= 1.79 hrs ART = 0.60 Hrs AST = 1.19 Hrs. Survey & Connection time = 0.71 Hrs Drill 6-3/4" directional hole from 10615' to 12327', sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 70 Torque off Btm = 7.9k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3500 psi on Btm with 250 psi differential pressure Printed: 5/312004 8:46:01 AM ) ) ...gi:Ì9~1·.?·.ºfBf1- Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 'Houts .. Task:GqåEt NRT Phase, ..' "-",-. .." ,: ;'.,.. ,,' '",,','; ":..'-.'.........,....,.,'. '." .." ".",.. ".. ".,." , ." ,,,', ,", ,. ""'.'" " '. " ' ,,- ',., ','," Dêscription of Oþerati()f1~ .."'.: 4/2/2004 00:00 - 14:25 14.42 STKOH C PROD1 P/U 150k S/O 52k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 14:25 - 17:45 3.33 STKOH C PROD1 17:45 - 19:00 1.25 DRILL P PROD1 19:00 - 19:30 0.50 DRILL P PROD1 Calculated ECD = 10.90 ppg Actual ECD = 11.85 ppg Drill ahead in 63/4" hole from 12327' to 12732' MD (original depth). Drilling parameters as above. Circulate to reduce ECD. Reciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3230 psi. ECD after Circulating = 11.32 ppg Drill6-3/4M directional hole from 12732' to 12800', sliding as required to maintain angle and azimuth. 19:30 - 20:00 0.50 DRILL P Calculated ECD = 10.93 ppg Actual ECD = 11.72 ppg PROD1 Circulate @ 12800' to reduce ECD. Riciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3230 psi. ECD after Circulating = 11.30 ppg PROD1 Drill 6-314" directional hole from 12800' to 13073', sliding as required to maintain angle and azimuth. WOB = 10-18 klbs RPM = 70 Torque off Btm = 6.0k FtLb, Torque on Stm = 7k FtLb GPM = 280 @ 3500 psi on Btm with 250-300 psi differential pressure P/U 150k SIO 52k ROT 103k 20:00 - 00:00 4.00 DRILL P Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 11.26 ppg Actual ECD = 11.77 ppg 4/3/2004 00:00 - 05:00 5.00 DRILL P On Bottom Drilling Time last 24 Hrs= 10.73 hrs ART = 5.29 Hrs AST = 4.81 Hrs. Survey & Connection time = 11.52 Hrs PROD1 Drill 6-3/4" directional hole from 13073' to 13580'. Sliding as required to maintain angle and azimuth. WOS = 5-15 klbs RPM = 70 Torque off Stm = 8.2k FtLb, Torque on Btm = 10-11 k FtLb GPM = 280 @ 3520 psi on Btm with 250-300 psi differential pressure P/U 156k S/O 56k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30', 05:00 - 06:00 1.00 DRILL P Calculated ECD = 10.90 ppg Actual ECD = 11.64 ppg PROD1 Circulate to reduce ECD. Riciprocate & rotate (70 rpm) drill string wihile circulating with 280 gpm @ 3140 psi. ECD after Circulating = 11.15 ppg PROD1 Drill 6-314" directional hole from 13580' to 13698' TO. Sliding as required to maintain angle and azimuth. 06:00 - 07:00 1.00 DRILL P Printed: 51312004 8:46:01 AM BP EXPLORATION ·C)perªtipl1~.·.SlJrrimðr,Y·.:Rgport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L -201 L -201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Paget 6 of 34 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 4/3/2004 06:00 - 07:00 FrÞnl..'fo Hours¡rask Code· NPT Description of Op~rªtions 07:00 - 12:00 12:00 - 15:30 15:30 - 16:30 16:30 - 19:30 19:30 - 23:00 1.00 DRILL P PROD1 5.00 DRILL P PROD1 3.50 DRILL P PROD1 1.00 DRILL P 3.00 DRILL P 3.50 DRILL P PROD1 PROD1 PROD1 23:00 - 00:00 1.00 DRILL P PROD1 4/4/2004 00:00 - 04:30 4.50 DRILL P PROD1 04:30 - 05:30 1.00 DRILL P PROD1 05:30 - 08:30 3.00 DRILL P PROD1 08:30 - 08:45 0.25 DRILL P PROD1 08:45 - 10:30 1.75 DRILL P PROD1 10:30 - 11 :00 0.50 DRILL P PROD1 11 :00 - 11 :30 0.50 CASE P COMP WOB = 5-15 klbs RPM = 70 Torque off Btm = 8k FtLb, Torque on Btm = 11 k FtLb GPM = 280 @ 3500 psi on Btm with 250-300 psi differential pressure P/U 150k S/O 52k ROT 103k Backream every stand at 280 gpm and 70 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.90 ppg Actual ECD = 11.40 ppg On Bottom Drilling Time = 2.27 hrs ART = 1.8 Hrs AST = 0.47 Hrs. Survey & Connection time = 3.73 Hrs Circulate & condition mud/hole from 13698'. Increase pump rate to 300 gpm with 3425 psi. Pump 25 bbl Lo-Vis sweep. Circulate hole clean (4.5 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Pump slug. Calculated ECD = 10.88 ppg ECD prior to Wiper Trip = 11.09 ppg POOH (Wiper Trip) to 7-5/8" Casing Shoe @ 7047'. Had one tight spot @ 11880'. Max over-pull = 35k. Worked through same with no other problems. Hole in good condition. Average drag 10-15k P/U 170k S/O 63k Off bottom with no pump. Service TDS. TIH with drill string to 13602' with no problems. M/U TDS. Establish circulation. Precautionary wash & ream to bottom @ 13698' with no problems. Circulate & condition mud/hole from 13698'. Increase pump rate to 300 gpm with 3350 psi. Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Calculated ECD = 10.96 ppg ECD prior to Wiper Trip = 11.09 ppg Flow check. Well static. Pump slug. POOH to run 4.5" Slotted Production Liner. P/U 160k S/O 75k Off bottom with no pump. POOH from 13231' to 7000' (7-5/8" Shoe @ 7047') with no problems. Hole in good condition. Max Drag 5-10k. Drop Circ-Sub opening dart. Break circulation, pump dart on seat. Open eire-sub (Placed @ 175' above bit) with 1800 psi. Stage pumps to 575 gpm with 3380 psi. Reciprocate & rotate (70 RPM) while circulating from 6825'. No drilling cuttings observed from Btms-up. Flow check. Well static. Pump slug. Continue POOH from 7000' to top of BHA. SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Remove RA Source. UD Anadrill Directional tools. Clean Rig Floor. RIU 4.5" Casing tongs & Liner Running equipment. Printed: 5/312004 8:46:01 AM ) ") CaMP SAFETY --- Held PJSM with rig crew & BOT personnel regarding running liner & P/U Liner Hanger-Packer assembly. CaMP M/U 4-1/2" Guide Shoe Jt + 159 Jts of 4-1/2" 12.6# L-80 IBT-M slotted liner + 14 Jts of 4.5" 12.6# L-80 IBT-M solid liner & BOT "Flex-Lock" Liner Hanger wI ZXP Liner Top Packer. Total length = 7240.49' Liner String wt = 55k. COMP RIH with 4-1/2" 12.6# Slotted liner assembly on 4" DP to 13680' with no problems. P/U & place 4.5" Liner Shoe @ 13672' . P/U 165k SIO 69k CaMP Drop 29/32" setting ball down DP. Pump on seat @ 4 bpm wI 600 psi. Once ball seated increased pressure to 2000 psi to set "Flex-Lock" Liner Hanger. SIO 35k on Hanger. Continue pressuring up to 3000 psi to set ZXP Packer. Pressure up to 4000 psi . Ball seat did not shear. P/U 12' above TBR & release packer setting dogs. Set 50k on ZXP packer to ensure proper setting. The 4.5" Slotted Liner Shoe set @ 13672' with top of liner @ 6432'. P/U on string placing end of DP @ 6358'. CBU @ 7 bpm wI 1520 psi. Flow check. Pump slug. POOH from 6358' with 4" DP. Finish POOH from 4700' with 4" DP. UD BOT Liner Hanger Running Tool. Clear & clean Rig Floor. Slip & cut 93' of drill line. Reset & check C-O-M. Adjust brakes. Service TDS. SAFETy---- Held PJSM with Rig Crew, Baker Oil Tools Rep & Anadrill personnel regarding P/U Whipstock + BHA. M/U L 1 (OBb) Whipstock assembly. Orient with MWD. P/U 9 x 4-3/4" DC. RIH with 4" HWDP. POOH from 1100' to change Whipstock spaceout. UD 1 Jt of 3.5" HWDP & Flex Jt. M/U Whipstock. Reorient with MWD. Shollow test MWD-OK. TIH with L 1 Whipstock assembly on 4" DP to 6398' (End of seals on Spaceout assembly). M/U TDS. Estabish circulation. Orient whipstock 15 deg LHS. Stab dummy seal assembly into Top of tie-back sleeve (11' sleeve) @ 6432'. Set down 20k to set whipstock anchor. P/U 10k over to verify anchor set. Set down 40k to shear whipstock lug. WEXIT Attempt to pressure test 7-5/8" casing to 1000 psi-Bleeding off. Check all surface equipment. Found no surface leaks. Attempted to test several times. Pressure bled off to 700 psi & holding. Consult with ODE. Consensus was to continue as per program. WEXIT Mill Window in 7-5/8" casing from 6372 to 6384' and drill 14' of new hole to 6398'. Work mills through window with no problems. NOTE: Window cut in 7-5/8" csg FI 6372' to 6384' WOB = 2-12k RPM = 70-114 Torque = 6500 KFtLb GPM = 250 @ 1500 psi Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES :t:)~tei':FrOR1+;roJrlOl,Jr$,;Task Code NPT . Phase 4/4/2004 11 :30 - 12:00 0.50 CASE P 12:00 - 18:00 6.00 CASE P 18:00 - 21 :00 3.00 CASE P 21 :00 - 22:00 1.00 CASE P 22:00 - 23:00 1.00 CASE P COMP 23:00 ~ 00:00 1.00 CASE P COMP 4/5/2004 00:00 - 02:30 2.50 CASE P COMP 02:30 - 04:00 1.50 CASE P CaMP 04:00 - 04:15 0.25 STWHIP P WEXIT 04:15 - 07:00 2.75 STWHIP P WEXIT 07:00 - 12:00 5.00 STWHIP N HMAN WEXIT 12:00 - 14:30 2.50 STWHIP P WEXIT 14:30 - 15:00 0.50 STWHIP P WEXIT 15:00 - 16:00 1.00 STWHIP P 16:00 - 20:00 4.00 STWHIP P Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 DescriptiQn of ..operations Printed: 51312004 8:46:01 AM BP EXPLORATION Operation~SummarY Report Page .1.8 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 DatØ From·-To Hours Task Code NPT Phase [)~scriptionof Opërations 4/5/2004 16:00 - 20:00 4.00 STWHIP P WEXIT P/U 129k S/O 92k Rotate Wt = 101 k 20:00 - 21 :00 1.00 STWHIP P WEXIT Pump Hi-vis sweep & circulate hole clean from 6398' wI 290 gpm @ 1800 psi. Reciprocate & rotate drill string (110 RPM) while circulating. 21 :00 - 21 :30 0.50 STWHIP P WEXIT Periorm FIT. Pressure up on formation to 665 psi with 9.2 ppg MOBM @ 4562' TVD = 12.0 ppg EMW. Flow check. Well static. Pump slug. Blow down TDS & related equipment. 21 :30 - 00:00 2.50 STWHIP P WEXIT POOH with Mill Assy & 4" DP to top of BHA. 4/6/2004 00:00 - 01 :30 1.50 STWHIP P WEXIT UD 9 x 4-3/4" DC, BOT mills & related equipment. Clear rig floor of excess whipstock milling equipment. 01 :30 - 02:30 1.00 STWHIP P WEXIT MIU ported sub. Flush out BOP's. UD sub. Blow down TDS, CIK Lines & all Suriace equipment in preparation for BOP Test. Pull wearbushing. 02:30 - 06:30 4.00 BOPSUP P WEXIT Held PJSM. RIH with BOP Test Plug on 4" DP & seat in wellhead. Rig Up Testing Equipment - Test BOP & Related Suriace Equipment: Test Annular, Upper And Lower Pipe Rams, Blind Rams, Manual & HCR Valves on C/K Lines, Choke Manifold, TIW Valve, DSIBOP Valve, Top Drive Upper & Lower IBOP Valves At 250 Psi. Low And 3,500 Psi. High. RID Test Equipment. Pull test plug. Install wearbushing. Blow down suriace lines. Witness Of BOP Test Waived By AOGCC Inspector John Spaulding. 06:30 - 07:00 0.50 DRILL P WEXIT SAFETY--- Held PJSM with Rig Crew & Anadrill personnel regarding picking up BHA tools & installing RA Source. 07:00 - 09:00 2.00 DRILL P WEXIT M/U (L 1, OBb) 6-3/4" Steerable Drilling assembly. Shallow test MWD-OK. 09:00 - 12:00 3.00 DRILL P WEXIT TIH with 6-3/4" Drilling assembly on 4" DP to 6350'. 12:00 - 12:30 0.50 DRILL P WEXIT MIU TDS. Establish circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. RIH (L 1 lateral) to 6388' without any problems. Establish baseline ECD of 10.49 ppg @ 280 gpm + 70 rpm. Wash & ream from 6388' to 6398'. 12:30 - 00:00 11.50 DRILL P PROD2 Drill 6-3/4" directional hole from 6398' to 7638'. Sliding as required to maintain angle and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 4.5k FtLb, Torque on Btm = 7.0k FtLb GPM = 280 @ 2750 psi on Btm with 300-375 psi differential pressure P/U 125k S/O 80k Rot Wt 95k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.40 ppg Actual ECD = 10.9 ppg On Bottom Drilling Time last 24 Hrs= 7.42 hrs ART = 4.52 Hrs AST = 2.9 Hrs. Survey & Connection time = 4.08 Hrs 4/7/2004 00:00 - 15:00 15.00 DRILL P PROD2 Drill 6-3/4" directional hole from 7638' to 9559'. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs Printed: 5/312004 8:46:01 AM ) ) BR.EXP4PRJ\TtON " -,,,,::,,:;t:,,,·, Operations·.~U.mmª~¥>:Røpºrt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/1 6/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours Task Code· NPT Phase Description of Operati0':1s 4n /2004 00:00 - 15:00 15.00 DRILL P PROD2 RPM = 65 Torque off Btm = 5.5k FtLb, Torque on Btm = 8.0k FtLb GPM = 280 @ 3100 psi on Btm with 300-375 psi differential pressure P/U 141k SIO 72k Rot Wt 103k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 15:00 - 18:30 3.50 DRILL P Calculated ECD = 10.72 ppg Actual ECD = 11.23 ppg PROD2 Circulate & condition mudlhole prior to wiper trip from 9559'. Circulate hole clean (3.5 x Btms-up). Reciprocate & rotate (75 rpm) while circulating. Flow check. Well static. Pump slug. 23:00 - 00:00 1.00 DRILL P Calculated ECD = 10.76 ppg ECD prior to Wiper Trip = 10.86 ppg PROD2 Wiper trip. POOH to 6368' (7-5/8" window @ 6372'-6384') with no problems. Max drag 25k. Average drag 10-15k. PROD2 Service TDS. Change out Actuator on Lower IBOP valve. PROD2 Break circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. TIH (L 1 lateral) to 9466' with no problems. M/U TDS. Precautionary wash & ream to bottom. No fill. Pump 20 bbl Lo-vis sweep. PROD2 Drill 6-3/4" directional hole from 9559' to 9589'. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 5k FtLb, Torque on Btm = 7.5k FtLb GPM = 280 @ 3100 psi on Btm with 300-375 psi differential pressure P IU 140k SIO 72k Rot Wt 103k 18:30 - 20:00 1.50 DRILL P 20:00 - 21 :30 21 :30 - 23:00 1.50 DRILL P 1.50 DRILL P Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 10.76 ppg Actual ECD = 11.23 ppg 4/8/2004 00:00 - 22:00 22.00 DRILL P On Bottom Drilling Time last 24 Hrs= 5.88 hrs ART = 3.63 Hrs AST = 2.25 Hrs. Survey & Connection time = 10.12 Hrs PROD2 Drill 6-3/4" directional hole in the L 1 (OBb) lateral from 9589' to 12172'. Sliding as required to maintain inclination and azimuth. **** NOTE: Drilled out the top of the OBb Zone **** WOB = 10-15 klbs RPM = 65 Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3350 psi on Btm with 300-400 psi differential pressure PIU 149k SIO 62k Rot Wt 97k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Printed: 51312004 8:46:01 AM BPEXPLORATION Qpf:}räti()f1~Summ~rY· Report Page· 20þf 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L -201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/1 6/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From-To HQurs ,-a~* Code NRT Phase 4/8/2004 00:00 - 22:00 22.00 DRILL P PROD2 Description of Op~ratiQns Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg 22:00 - 22:15 0.25 STKOH C PROD2 22:15 - 00:00 1.75 STKOH C PROD2 4/9/2004 00:00 - 02:00 2.00 STKOH C PROD2 On Bottom Drilling Time last 24 Hrs= 7.94 hrs ART = 4.9 Hrs AST = 3.04 Hrs. Survey & Connection time = 14.06 Hrs POOH (2 Stds) to 11933' for Geological Sidetrack after exiting the top of the OBb sand. Break circulation. Stage pumps to 280 gpm wI 2800 psi. Orient TF to 135 deg RHS for Open Hole Sidetrack. Start trenching from 11933' to 11953'. Perform open hole sidetrack in the L 1 (OBb) lateral. Time drill from 11953' to 11963'. 02:00 - 05:30 3.50 STKOH C WOB = 0-2k GPM = 280 @ 2800 psi P/U 149k S/O 62k Rot Wt 97k PROD2 Drill 6-3/4" directional hole in the L1 (OBb) lateral from 11963' to 12172' (original depth). Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 8.4k FtLb, Torque on Btm = 9.5k FtLb GPM = 280 @ 3350 psi on Btm with 300-400 psi differential pressure P/U 149k. 8/0 62k. Rot Wt 97k. Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. 05:30 - 19:45 14.25 DRILL P Calculated ECD = 10.80 ppg Actual ECD = 11.6 ppg PROD2 Continue drilling 6-3/4" L 1 lateral from 12172' to 13540' TD I 4565' TVD. Sliding as required to maintain inclination and azimuth. WOB = 10-15 klbs RPM = 65 Torque off Btm = 8k FtLb, Torque on Btm = 9-12k FtLb GPM = 280 @ 3300 psi on Btm with 300-350 psi differential pressure P/U 161 k S/O 48k Rot Wt 100k Backream every stand at 280 gpm and 65 rpm, reducing flow rate to 210 gpm on down stroke. Survey every 30'. Calculated ECD = 11.05 ppg Actual ECD = 11.55 ppg 19:45 - 23:00 3.25 DRILL P On Bottom Drilling Time last 24 Hrs= 7.7 hrs ART = 3.7 Hrs AST = 4.0 Hrs. Survey & Connection time = 12.30 Hrs PROD2 Circulate & condition mudlhole prior to wiper trip from 13540'. Circulate hole clean (3 x Btms-up). Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Printed: 5/312004 8:46:01 AM ) ) .....·..·Page.·.2töfà4.. BP>SX,PLQ8AIIQN .. .. ····ºp'ªtª~~C)n<~,.·..:sUmfhªry·Røf:i()rt.· Calculated ECD = 10.96 ppg ECD prior to Wiper Trip = 11.01 ppg Wiper trip. POOH to 12606' with no problems. Max drag 20k. Average drag 10-15k. P/U Off Btm no pump = 175k S/O 60k. Continue wiper trip. POOH from 12606' to 6368' (7-5/8" window @ 6372'-6384') with no problems. Max drag 25k @ 10679'. Average drag 10-15k. Slip & cut 71' of drill line. Reset & check C-O-M. Check Drawworks brakes. Service TDS. Break circulation. Orient MWD TF to 15 deg LHS to exit window. Stop pumps. Slack off & exit window. TIH to 13475'. Encountered tight hole from 10730' to 10965' & at 11830' with 25k down drag. Work through same with no other problems. PROD2 M/U TDS. Establish circulation. Precautionary wash & ream to bottom @ 13540' with no problems. Circulate & condition mud/hole with 280 gpm @ 3070 psi. Circulate hole clean with 5.3 x Btms-up. Reciprocate & rotate (100 rpm) while circulating. Flow check. Well static. Pump slug. Calculated ECD = 11.01 ppg Actual ECD = 11.44 ppg ECD prior to Trip = 11.01 ppg PROD2 POOH from 13540' to 6559' with no problems. Place Circ-Sub at bottom of whipstock. Hole in good condition. Average Drag 5-15k. P/U 172k S/O 60k off bottom with no pump. PROD2 Drop Circ-Sub opening dart. Break circulation, pump dart on seat. Shear eire-sub with 2180 psi (Placed @ 175' above bit). Stage pumps to 200 gpm with 500 psi. P/U on drill string washing by window & across whipstock face. Pull bit inside 7-5/8" casing to 6364'. PROD2 Pump Lo-vis sweep. Circulate hole clean from 6189' with 450 gpm @ 2020 psi. Reciprocate & rotate (65 RPM) while circulating. No drill cuttings observed from Btms-up. Flow check. Well static. Pump slug. Continue POOH with drill string to top of BHA. SAFETY --- Held PJSM with Rig Crew & Anadrill personnel regarding removing RA Source & UD BHA tools. Remove RA Source. UD all Anadrill Directional tools & bit. Clear & clean rig floor. SAFETY--- Held PJSM with rig crew, Anadrill & Baker personnel regarding M/U Whipstock retrieving tool (WSRT) & BHA. M/U WSRT & BHA which consists of the following: Whipstock Hook retrieving tool + 1 Jt of 3.5- HWDP + FS + MWD + Bumper-Sub + Oil Jar + 12 x 4-314- DC + XO + 24 x 4- HWDP = 1199.63'. Shallow test MWD-OK. PROD2 TIH with WSRT BHA on 4- DP to 6328'. PROD2 M/U TDS. Break circulation. Stage pumps to 244 gpm w/1330 psi. Orient WSRT to 15 deg LHS. (P/U Wt 132k S/O Wt 90k). Slack off on drill string to 6378'. P/U & engage whipstock. Pull on whipstock with 60k overpull, no release. Jar on whipstock 3 additional times with 65k over pull & release Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS9ES From~.JQ.Hqurs ,Tfas~(. Gód~ ,NPT Phase 4/9/2004 19:45 - 23:00 3.25 DRILL P PROD2 23:00 - 00:00 1.00 DRILL P PROD2 4/10/2004 00:00 - 02:30 2.50 DRILL P PROD2 02:30 - 04:00 1.50 DRILL P PROD2 04:00 - 08:00 4.00 DRILL P PROD2 08:00 - 13:45 5.75 DRILL P 13:45 - 17:30 3.75 DRILL P 17:30 - 18:00 0.50 DRILL P 18:00 - 19:00 1.00 DRILL P 19:00 - 21 :30 2.50 DRILL P PROD2 21 :30 - 21 :45 0.25 DRILL P PROD2 21 :45 - 23:30 1.75 DRILL P PROD2 23:30 - 00:00 0.50 DRILL P PROD2 4/11/2004 00:00 - 00:15 0.25 STWHIP P PROD2 00:15 - 01 :30 1.25 STWHIP P PROD2 01 :30 - 03:30 03:30 - 04:00 2.00 STWHIP P 0.50 STWHIP P Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations Printed: 51312004 8:46:01 AM BP EXPLORATION Op~rati on.~SYrTIm~.ry . Report page:Z2 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From·~ To Hours· Task Code NPT Phase Description of Operél.tion~ 4/11/2004 03:30 - 04:00 0.50 STWHIP P PROD2 whipstock. P/U & pull seals out of bottom tie-back receptacle. Pull whipstock up to 6358' (P/U Wt = 138k). Monitor well 5 minutes. Annulus level fell +1- 20'. 04:00 - 05:00 1.00 STWHIP P PROD2 CBU from 6358' with 200 gpm @ 875 psi. Lost 12 bbl mud at start of circulating. Lost another 2 bbl mud while circulating Btms-up. Flow check. Fluid level dropping very very slow. Pump slug. 05:00 - 07:30 2.50 STWHIP P PROD2 POOH with whipstock assembly #1 to top of BHA. 07:30 - 11 :00 3.50 STWHI P P PROD2 Stand back 4" HWDP & 4-3/4" DC. UD MWD, Whipstock retrieving tool, L 1 Whipstock & 3.5" DP space-out assembly. 100% recovery of all Whipstock & downhole tools. Clear & clean rig floor. 11 :00 - 12:00 1.00 CASE P COMP Rig up 4.5" Liner running equipment. 12:00 - 12:15 0.25 CASE P COMP SAFETY--- Held PJSM with rig crew & BOT personnel regarding running liner & P/U Hook Hanger assembly. 12:15-19:30 7.25 CASE P COMP M/U 4-1/2" Float Shoe (Bent) Jt + 155 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner'. Continue TIH. Tag up on the "Mother Bore" liner top packer @ 6432'. POOH to 6378' which is mid-point of window. Apply one round of RHT in string. Slack off & exit 7-5/8" window into open hole with no other problems.Continue running 15 additional Jts of 4.5" slotted liner (170 Jts Slotted) + 1 Jt of solid liner + XO Pup Jt & BOT Flanged Hook Hanger assembly. Total length = 7138.16' P/U Wt = 98k SIO Wt = 70k Theoretical Liner Wt in mud = 77,500 Lbs 19:30 - 20:00 0.50 CASE P COMP Change elevators to fit 4" DP. R/D Hydraulic Casing Tongs & related equipment. 20:00 - 00:00 4.00 CASE P COMP Continue RIH with 4-1/2" slotted liner on 50 Stds of 4" DP to 11809'. P/U 148k SIO 55k 4/12/2004 00:00 - 01 :00 1.00 CASE P COMP Continue RIH with 4.5" Slotted Production liner from 11809'. Tag-up solid @ 13163'. Note: Had 50 Stds of 4" DP + 8 stds 4" HWDP + 4 stds 4-3/4" DC's + 2 stds & double of 4" DP . Work string 60' up & down four times. Stacking out all available weight with string stopping @ 13163' each time. 01 :00 - 02:00 1.00 CASE P COMP M/U TDS. Establish circulation. Stage pumps to 6 bpm @ 1200 psi to help reduce friction between drill string & casing. Continue working string 30' to 60'. String starting to move down slowly. Reduce pump rate to 3 bpm with 365 psi. Continue working string down from 13163' to 13516' (That places the Hook-Hanger 10' past bottom of 7-5/8" window @ 6384'). Stop pumps. P/U 200k S/O 58k 02:00 - 02:30 0.50 CASE P COMP P/U on string & position Hook-Hanger @ 6340'. Rotate 1/4 turn. Run in & go past hook point. Pull back up with Hook-Hanger to 6340'. Rotate additional 1/4 turn. Run back down & land Hook-Hanger on the lower lip of 7-5/8" window @ 6384'. Reconfirm Hook-Hanger landed by picking up 20' & relanding same. Did this three times with Hook-Hanger landing out in same spot every time. Stack out all available string weight + 10k from TDS down on Hook-Hanger (+1- 33k). 02:30 - 03:30 1.00 CASE P COMP Drop 29/32" ball & pump on seat. Pressure up to 2700 psi to Printed: 5/312004 8:46:01 AM ) ) ~, : .~" .'...'; . '.::,6, P""JE,',X"",' P'" ::,L,QRA\"'IQ"~".,:,,.·.,:,,;·', ;,,; . "''''''., :"'···:·'.º.P~:~ftt.iQD.~:,.,·§,gm'rn:ª.rY..'Re.p(J'rt". : , .. "~;':': i~' . , ..n.¡':.,:,:";',;".;... Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES .~ :'~. :", , Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date 1..FrörYl~ To HoUrs Task Cöde NPT Description of Operations COMP release HWH Running tool. P/U Drill string 10' (P/U 135k) & verify HWH Running tool released. Lost 60k string wt. Set back down & tag Hook-Hanger with 25k-OK. P/U on string & place HWH Running tool @ 6335' (32' above Hook Hanger @ 6367'). R/U Side Entry Pump-in sub into the 4" DP. Pressure up to 4750 psi & blow ball seat. RID pump-in sub. M/U TDS. CBU from 6335' with 6 bpm @ 960 psi. Flow check. Well static. Pump slug. Blow down TDS. POOH with 4" DP from 6335' to surface. UD Baker HWH Running tool. Clear & clean rig floor. SAFETy---- Held PJSM with Rig Crew & Baker Service Rep regarding P/U LEM & ZXP Packer assembly. M/U LEM/ZXP assembly on 4" DP. TIH with LEM/ZXP assembly on 60 Std of 4" DP + 8 Std of 4" HWDP to 6316'. M/U TDS. RIH slowly to 6330'. Establish up & down string weights, P/U 125k S/O 100k. Slack off on string to set the LEM into the hook hanger collet @ 6362' with the 4.75" OD Seals stung into the Lower (OBd lateral) Seal Bore Extension @ 6475'. Land LEM with 20k. P/U 10k to verify set, then slack off 10k on ZXP packer & park pipe. Drop the 29/32" setting ball and pump onto seat @ 2 bpm wI 210 psi. Pressure up to 2500 psi, wait 2 minutes, then increased pressure to 2900 to set the ZXP packer. At this point in time while pressuring up to release the Baker Type "HRD" Packer Setting tool which was pinned to shear @ 3600 psi, the ball seat sheared prematurely at 3350 psi. COMP Pressure test ZXP Packer x 7-5/8" casing to 1500 psi for 15 minutes. Lost 75 psi. DFAL COMP Attempt to release from ZXP Packer. Work string up to 135k (10k Over-pull) & down to 50k with no success. Apply 2.5 Left Hand turns into string. Work torque down & attempt to release Packer Setting Tool. Tool would not release. Pull up to 150klbs (-25 klbs over PU wt). Still not indicating that Setting tool is released from L TP assembly. NOTE: The Baker Type "HRD" Setting Tools primary releasing mechanism is hydraulic with an emergency mechanical back-up Left-hand release. DFAL COMP 9ES Rig Team discussed downhole tool failure problem with the BP ODE & Baker Engineers. After evaluating the options it was decided to drop a 1.75" OD Steel Ball down the string, let gravitate on seat. Then pressure up to 4200 psi on the drill pipe to ensure that the ZXP Packer & Hold Down slips are fully set & also to shear the hydraulic release mechanism on the Packer Setting tool. DFAL COMP Waiting on Baker to deliver a 1.75" aD Steel Ball to the rig. DFAL COMP Break off TDS from DP. Drop the 1.75" OD Steel Ball down 4" DP. M/U TDS. Let ball gravitate on seat. DFAL COMP Pressure up on drill string to 4200 psi. Hold for 10 minutes. Release pressure. P/U on string. Packer Setting tool free. P/U 12' to & position the rotating Dog Sub on HRD Setting tool above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack off on string & slam 65klbs down weight on ZXP Packer. 4/12/2004 1.00 CASE P 02:30 - 03:30 03:30 - 04:30 1.00 CASE P COMP 04:30 - 07:30 3.00 CASE P COMP 07:30 - 08:30 1.00 CASE P COMP 08:30 - 09:00 0.50 CASE P COMP 09:00 - 15:30 6.50 CASE P COMP 15:30 - 17:00 1.50 CASE P COMP 17:00 - 17:30 0.50 CASE P 17:30 - 18:00 0.50 CASE N 18:00 - 20:30 2.50 CASE N 20:30 - 21 :30 21 :30 - 23:00 1.00 CASE N 1.50 CASE N 23:00 - 23:30 0.50 CASE N Printed: 51312004 8:46:01 AM BP EXPLORATION Operª~lons ~Uml11ªrYf1~port Page 24 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date·· From.;. To Hours Task COdeNPT .. Phase .... ... D~sçriptionof Operations 4/12/2004 23:00 - 23:30 0.50 CASE N DFAL COMP Repeated this process 5 additional times. NOTE: Top of "L 1" ZXP Packer @ 6319' MDRKB. 23:30 - 00:00 0.50 CASE P COMP Break out TDS. Pull one std of 4" DP & rack in derrick. Blow down TDS & surface equipment. 4/13/2004 00:00 - 01 :30 1.50 CASE P COMP Slip & cut drill line. Reset & check C-O-M. Check drawworks brake system. Service TDS. 01 :30 - 04:30 3.00 CASE P COMP POH (Wet) with 4" DP work string. UD Baker "HRD" Setting Tool. NOTE: The Dog sub was sheared on setting tool but the shear screws on the emergency mechanical release mechanism did not shear. 04:30 - 05:00 0.50 CASE P COMP Clean rig floor of excess MOBM that was generated from Wet Trip. 05:00 - 09:30 4.50 BOPSUPP WEXIT Drain stack & pull wear ring. Hold PJSM. Test BOPE to 250 psi/3500 psi. Lower pneumatic well control valve would not test. Witness of test waived by Jeff Jones - AOGCC. 09:30 - 10:30 1.00 BOPSUR P WEXIT Blow down lines. Install wear ring. 10:30 - 12:30 2.00 BOPSUP P WEXIT PJSM. Change out lower well control valve, pressure test to 250 I 3500 psi. 12:30 - 13:00 0.50 STWHIP P WEXIT Bring Baker whipstock tools to floor. 13:00 - 13:30 0.50 STWHIP P WEXIT PJSM with all personnel on handling and running Baker whipstock. 13:30 - 15:30 2.00 STWHIP P WEXIT M/U whipstock BHA wI 3 1/2" spaceout and dummy seal assembly hanging below, orient MWD wI whipstock 15:30 - 16:30 1.00 STWHIP P WEXIT RIH wI collars and HWDP, shallow test MWD 16:30 - 20:00 3.50 STWHIP P WEXIT RIH wI whipstock on 4" drillpipe, fill pipe at 4000',6250', 135K UP, 95K ON, no pump 20:00 - 21 :00 1.00 STWHIP P WEXIT Orient whipstock 7 degrees left of high side at 50' above setting depth, slack off and stab dummy seal into tieback sleeve on L-1 at 6319', set down 20K to set whipstock anchor, continue to set down 35K and shear mills off whipstock, test casing to 1500 psi, bled down 70 psi in 7 minutes, 21 :00 - 00:00 3.00 STWHIP P WEXIT Record SPR's. Start intial cut to place Top of Window at 6229' DPM. 130K UP, 93K DN, 105K RT, 3K WOB, 118 SPM, 290 GPM, 1840 PSI, 100 RPM, 6K TO, Mill window to 6237' MN Depth. 4/14/2004 00:00 - 00:30 0.50 STWHIP P WEXIT Mill window from 6237' to 6241', drill new hole from 6241' to 6254' RT WT 105, GPM 290, SPP 1890 psi, RPM 100, TQ 6000 00:30 - 01 :30 1.00 STWHIP P WEXIT Circulate high vis sweep S/S, 295 GPM, 1775 PSI, working string mills 01 :30 - 02:00 0.50 STWHIP P WEXIT Perform FIT test to EMW 12.0 ppg, applied surface pressure 650 psi, mud weight 9.2 ppg MOBM 02:00 - 04:00 2.00 STWHIP P WEXIT Monitor well, pump dry job, POH 04:00 - 05:30 1.50 STWHIP P WEXIT Stand back HWDP, Lay down DC, Lay down milling BHA, string mill in guage at 6.75" 05:30 - 06:00 0.50 STWHIP P WEXIT Clean and clear rig floor 06:00 - 06:30 0.50 STWHIP P WEXIT M/U ported sub, jet BOP stack Recovered a total of 130 Ibs of metal from milling and jetting stack 06:30 - 08:30 2.00 DRILL P WEXIT PJSM wI Anadrill DO I MWD and all rig crew, picking up of BHA # 11 and installing RA source, Printed: 5/3/2004 8:46:01 AM .,~<, ,.,~.., :'."I~;.:,,, ,: ".'. :/:< " Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ) ) '.' SHE22<R,LQ8A,-tON.· ··O.perations ·Summaryr:iepotf·' L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES ·g~g¢·?êºtª4· '" ,.', .', "".",'. Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 4/14/2004 08:30 - 11 :30 11 :30 - 12:00 12:00 - 00:00 4/15/2004 00:00 - 12:00 12:00 - 17:00 17:00 - 18:00 18:00 - 00:00 3.00 DRILL P 0.50 DRILL P 12.00 DRILL P WEXIT WEXIT PROD3 12.00 DRILL P PROD3 5.00 DRI LL P PROD3 1.00 DRILL P PROD3 6.00 DRILL P PROD3 4/16/2004 00:00 - 01 :30 1.50 DRILL P PROD3 01 :30 - 04:30 3.00 DRILL P PROD3 04:30 - 05:00 0.50 DRILL P PROD3 05:00 - 06:00 1.00 DRILL P PROD3 06:00 - 10:00 4.00 DRILL N AREP PROD3 10:00 - 13:30 3.50 DAILL P PAOD3 ;".':.:,:,':., ':"""" , :",; ". ...'",:.,:',.":,:, . ::",:,.,: :.:'''':'..'''' ',' ,'.. . ,...., ". ,.., ,.., ". ".. ,.. · ······[)escription·of0peratie>r1s RIH wI stands to 1172', test MWD, RIH to 6208' Circulate to obtain SPR I ECD baseline of 10.56 ppg S/O through TOW at 6229' wI no pump, continue to drill from 6254' to 7607' 123K UP, 80K DN, 99K AT WT, 114 SPM, 280 GPM, 2700 PSI ON 2330 PSI OFF, 65 APM, 4.5 - 6.5K TO ON, 4.3 TO OFF, 3K -12K WOB Calculated ECD 10.29 ppg, Actual ECD 10.72 ppg, Backream each stand, Survey every 30', slide as per DD AST 1.88 hrs, ART 2.41 hrs 128K UP, 86K DN, wI no pumps Directional Drill from 7607' to 9249', 127K UP, 86K DN, 104K AT, 114 SPM, 280 GPM, 2823 PSI ON, 2607 PSI OFF, 65 APM, 4.5 - 7K TO ON, 4.5K TO OFF, 5- 10WOB Calculated ECD 10.38 ppg, Actual ECD 10.92 ppg Backream each stand, Survey every 30', slide as per DD. Directional Drill from 9249' to 10,027' 140K UP, 76K DN, 101K AT, 114 SPM, 280 GPM, 3140 PSI ON 2780 PSI OFF, 65 APM, 8 - 11 TO ON, 7.1K TO OFF,S - 15 WOB Calculated ECD 10.64 ppg, Actual ECD 11.67 ppg Backream each stand, Survey every 30', AST 1 hr, ART 2.36 hrs Circulate bottoms up to lower ECD from 11.67 ppg to 11.23 ppg Add 50 bbls L VT -200 Directional Drill from 10,027' to 10,679' 142K UP, 72K DN, 101K RT, 114 SPM, 280 GPM, 3140 PSI ON 2860 PSI OFF, 65 RPM, 7 - 8.5K TO ON, 7.6K TO OFF,5- 10WOB Calculated ECD 10.75 ppg, Actual ECD 11.47 ppg Backream each stand, Survey every 30', slide as per DD AST 1.24 hrs, ART 2.69 hrs Circulate bottoms up twice, Calculated ECD 10.77 ppg, Actual ECD 11.48 ppg, Circulate at 280 GPM, 2850 PSI, 80 RPM, ECD after circulating 11.19 ppg Monitor well, POH 5 stds, pump dry job, intermittent drag 5 - 20K, POH to window, no problems coming thru window, POH to 6208' Rig service, service top drive and crown Slip I cut 52' of drilling line During TD service, found capscrews locating Top Drive brake disc in place on traction motor shaft had sheared off so TD brake is not functioning. Inspect & repair same. Orient MWD high sde, slide past whipstock wI no pump, fill pipe and test MWD at 7000', AIH to 9000', fill pipe, no pump, continue to 10,285', start to wash down, 250 gpm, 50 rpm, Printed: 51312004 8:46:01 AM BP EXPLORATION Operations Summ.ªry Report Page 26 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Qate From.:. To Hours. Task . Code ·NPT Phase . Description of Operatipns 4/16/2004 10:00 - 13:30 3.50 DRILL P PROD3 2580 psi, 12.0 ECD 13:30 - 14:30 1.00 DRILL P PROD3 At 10,285' circulate bottoms up, drop ECD from 12 to 11.20 ppg, 250 gpm, 2580 psi, 50 rpm 14:30 - 15:00 0.50 DRILL P PROD3 RIH from 10,285' to 10,585', wash from 10,585' to 10,679' 15:00 - 00:00 9.00 DRILL P PROD3 Dir Drill from 10,679' to 11,436', UP WT 148K, DN WT 56K, RT WT 102K 290 GPM, 3220 PSI ON, 2925 PSI OFF, 8 - 12 TQ ON, 8.6 TQ OFF, Cal ECD 10.66 ppg, Act ECD 11.38 ppg, 65 RPM, Sackream each stand, driil rate up stroke, reduce rate to 250 gpm down stroke Slide as per DD, AST 1.78 hrs, ART 1.24 hrs 4/17/2004 00:00 - 02:00 2.00 DRILL P PROD3 Dir Drill from 11,436' to 11,625' 154K UP, 58K DN, 102 RT WT, 118 SPM, 2910 PSI OFF 3290 PSI ON, Cal ECD 10.70, Act ECD 11.31 Sackream each stand at drilling rate up, 250 gpm down stroke 02:00 - 03:30 1.50 DRILL N WAIT PROD3 Circulate while wellsite Geologist consults with Anchorage Geology team. 03:30 - 11 :30 8.00 DRILL P PROD3 Dir drill from 11,625' to 12,359' 151K UP, 54K DN, 103K RT WT, 118 SPM, 3000 PSI OFF 3180 PSI ON, 8 - 10K TQ ON, 8.4K TO OFF,S - 10K WOS Cal ECD 10.75, Act ECD 11.48, AST 1.8, ART 2.52 Sackream each stand at drilling rate up, 250 gpm down stroke 11 :30 - 12:30 1.00 DRILL P PROD3 Circulate to drop ECD from 11.75 to 10.71 ppg 280 GPM, 2936 PSI, 65 RPM 12:30 - 23:00 10.50 DRILL P PROD3 Dir Drill from 12,359' to 13,106' 157K UP, 55K DN, 103K RT WT, 118 SPM, 3014 PSI OFF 3355 PSI ON, 9 - 11 K TQ ON, 9K TO OFF,S - 10K WOS Cal ECD 10.41, Act ECD 10.80, AST 2.1, ART 1.75 Sackream each stand at drilling rate up, 250 gpm down stroke 23:00 - 00:00 1.00 DRILL P PROD3 Circulate to drop ECD from 10.80 to 10.41 ppg 290 GPM, 3350 PSI, 65 RPM 4/18/2004 00:00 - 00:30 0.50 DRILL P PROD3 Dir Drill, slide from 13,106' to 13,114' 152K UP, 58K DN, 100K RT WT, 114 SPM, 280 GPM 3350 PSI ON, 3010 PSI OFF, 1 - 5K was, 10K TO ON, 9K TO OFF, Cal ECD 10.80, Act ECD 11.25 00:30 - 01 :00 0.50 DRILL N DFAL PROD3 Circulate and test mud motor, motor on bottom causes pressure spike. Unable to operate motor within limits (acts as if pumping thru a stalled motor). Geologist consults Anchorage and they are prepared to call this TD for lateral L2. 01 :00 - 03:30 2.50 DRILL N DFAL PROD3 Circulate to drop ECD from 11.25 to 11.10 actual, calculated 10.80 ppg for wiper trip. 03:30 - 08:00 4.50 DRILL N DFAL PROD3 Wiper trip to window, flow check, pull 5 stands, flow check, pump slug, Minor drag at 12710' & 11120' (15 klbs over normal drag). Drop back down thru same and come back thru - OK. Continue up inside window without further tight spots or problems. 08:00 - 08:30 0.50 DRILL P PROD3 Service top drive. 08:30 - 09:30 1.00 DRILL N DFAL PROD3 Attempt to break circ to orient for exiting window. Circ pressure 4000 psi @ 200 gpm. Discuss with Anch DE and agree to POH for new motor. Drop circ sub ball and open same. Circ casing clean at 450 gpm @ 1900 psi. Monitor well & pump dry job. Printed: 5/312004 8:46:01 AM ) ') J3.RSXPC1QHAJION··.i .... ·:'L:·!;PQ~rªtJ.ºn:S..·..·.$.~:··ITI.m,ªry·,R~·p,Qrt "'<'.,.,~;.f.-¡' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 D,ate From - To Hours . Task Code NPT Phase Description of Operations 4/18/2004 09:30 - 12:30 3.00 DRILL N DFAL PROD3 POH for motor changeout. Will go back in with new 1.15 deg AIM motor and no Neutron/Density tool to drill remaining 400' of hole as agreed by Anch Geology and ODE. 12:30 - 14:00 1.50 DRILL N DFAL PROD3 PJSM, w/ MWD, DD, rig crew on handling of source, handling BHA, change out motor, bearing pack gone 14:00 - 14:30 0.50 DRILL N DFAL PROD3 Clear and clean rig floor 14:30 - 15:00 0.50 DRILL N DFAL PROD3 Down load MWD and LWD, up load VPWD 15:00 - 17:00 2.00 DRILL N DFAL PROD3 Make up bit # 9, run BHA # 12 17:00 - 22:30 5.50 DRILL N DFAL PROD3 RIH to 1500', shallow test MWD, RIH to 6229', orient 7 left of highside, slide through window, RIH to 10,000', fill drillstring, RIH to 10,935', taking weight approx 25k, to 110988' and again at 11680'. Wash from 13,010' to bottom. Estimate losing approx 75 bbl mud to formation during trip. 22:30 - 00:00 1.50 DRILL N DFAL PROD3 Circulate to lower initial ECD on bottom of 12.14 to 10.81 ppg 213 GPM, 2058 PSI 4/19/2004 00:00 - 04:30 4.50 DRILL P PROD3 Directional drill from 13,114' to 13,490', TD for lateral # 3 157KUP, 56KDN, 99KRT, 10-15KWOB, 118SPM, 290 GPM 2920 PSI OFF, 3150 PSI ON, 10K TO ON, 9K TO OFF Circulate throughout to keep calculated ECD at 10.81 ppg, actual 11.41 ppg. Mud seepage loss to well at 1-2 bph. 04:30 - 08:00 3.50 DRILL P PROD3 Circulate to lower actual ECD from 11.41 ppg to 11.08 ppg for trip out. Calculated ECD 10.88 ppg plus 0.2 = 11.08 ppg. Current ECD = 11.01 ppg. 08:00 - 16:00 8.00 DRILL P PROD3 Moniter well, pump dry job, POH, intermitten overpull of 5 - 15K, record up / dn WT every 5 stands in open hole, every 10 stands in casing 16:00 - 17:00 1.00 DRILL P PROD3 Lay down directional drilling BHA # 12 17:00 - 17:30 0.50 DRILL P PROD3 Clean and clear rig floor 17:30 - 18:00 0.50 RUNCOrvP COMP Pick up / make up whipstock retrieving BHA 18:00 - 19:30 1.50 RUNCOrvP COMP Pick up / make up 24 x 4 3/4· DCs from pipe shed 1 x 1 19:30 - 21 :00 1.50 RUNCOrvP COMP Trip in to 6167' w/ drillpipe 21 :00 - 22:30 1.50 RUNCOrvP COMP Rig service, service top drive / crown 22:30 - 23:00 0.50 RUNCOrvP COMP Orient 7 left high side, slide hook down to 6235', work down, latched in on second attempt, pick up to 175K and set jars off, pick up to 200K and set off jars, pick up to 21 OK, whipstock free, trip to 6200', UP WT 140K, DN WT 95K 23:00 - 23:30 0.50 RUNCOrvP COMP Circulate bottoms up, 275 GPM, 1750 PSI, losses of 17 bbls downhole in first 10 minutes of circulating, monitor wellbore, pump dry job 23:30 - 00:00 0.50 RUNCOrvP COMP Trip out with whipstock and assembly, UP WT 150K 4/20/2004 00:00 - 04:00 4.00 RUNCOrvP COMP Trip out slowly with whipstock 04:00 - 05:30 1.50 RUNCOrvP COMP Lay down whipstock retrieving BHA, lay down whipstock and tail space out tubulars. 05:30 - 06:30 1.00 RUNCOrvP CaMP Clean and clear rig floor 06:30 - 07:30 1.00 RUNCOrvP COMP Rig up to run 4 1/2" L-80 slotted liner 07:30 - 16:00 8.50 RUNCOrvP COMP PJSM, RIH w/ slotted liner, make up to mark, 2300 ft Ibs torque, use BOL 2000 NM dope, run at 90 seconds per joint in casing, RIH to middle of window at 6235', RIH with joint # 152, 10' down taking wt at 6330', POH to middle of window, turn pipe 1/4 turn work tq down, RIH to 6330' taking wt, POH to Printed: 51312004 8:46:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 28 of 34 BP EXPLORAJION Operati9nSSUI1'llTlary Repor~ L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES 4/20/2004 07:30 - 16:00 From - To Hours Task Code NPT Phase COMP Date 16:00 - 21 :30 21 :30 - 23:00 23:00 - 00:00 8.50 RUNCOIvP 5.50 RUNCOIvP COMP 1.50 RUNCOIvP COMP 1.00 RUNCOtv1P COMP 4/21/2004 00:00 - 00:30 0.50 RUNCOrvP COMP 00:30 - 05:00 4.50 RUNCOIvP COMP 05:00 - 06:00 1.00 RUNCOIvP COMP 06:00- 06:30 0.50 RUNCOIvP COMP 06:30 - 07:30 1.00 RUNCOIvP COMP 07:30 - 11 :30 4.00 RUNCOIvP COMP 11 :30 - 12:00 0.50 RUNCOIvP COMP 12:00 - 13:30 1.50 RUNCOIvP COMP 13:30 - 15:00 1.50 RUNCOIvP COMP 15:00 - 17:00 2.00 RUNCOIvP COMP 17:00 - 18:00 1.00 RUNCOIvP COMP 18:00 - 19:00 19:00 - 19:30 19:30 - 20:30 1.00 RUNCOIvP COMP 0.50 RUNCOIvP COMP 1.00 RUNCOIvP COMP Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations 6235', turn 1/4 turn, bent jt through window on 4 th attempt, liner in open hole, run speed 60' per minute, make up hook hanger, 100K UP WT, 70K DN WT, ran total of 171 jts of 4 1/2" liner Change out casing equipment, rig to run stands from derrick, RIH to 13,458', 190K UP WT, 55K DN WT RIH to 10' past hook hanger at 13,458', turn pipe 1/4 turn, work tq in pipe, work down past window, turn pipe 1/4 turn, work tq down, work past window, failed at 2 more attempts, turn pipe 1/8 turn, work tq down, work hook past window, continue turning 1/8 turn and working past pipe down window. 200K UP WT, 50K DN WT Land Hook hanger, drop 29/32" ball, pump first 30 bbls at 4 bpm, 636 psi, reduce to 2 bpm, 175 psi for 15 bbls, pump 1 bbl to seat, pressure to 3000 psi, release HR tool, free pick up wt 140K, lost 60K, pressure up and shear ball seat at 4400 psi Circulate bottoms up at 375 gpm, 2290 psi, with pumps oft tag up, top of hook hanger at 6224', 11.5' up on stand 51, monitor wellbore, pump dry job Trip out, lay down 12 x 4 3/4" DCs, Lay down Baker liner running tools Clean and clear rig floor Drain BOP stack, pull wear bushing, install test plug PJSM, PT BOP and all related equipment to 250 psi low, 3500 psi high Perform D4 accumulator function test Witnessing waived by Lou Gramaldi AOGCC Pull test plug, install wear bushing Rig service, service top drive Rig up, pick up, make up LEM # 2 assembly, make up to mark 3200 ft Ibs, use SOL 2000 dope, make up seal bore assembly to 4600 ft Ibs RIH slow on DCs, mud overflowing pick up subs, make up top drive to HWDP RIH through hook hanger at 6224', slide through no problems 135K UP WT, 95K DN WT Appear to have tagged up 13' higher, (collar from LEM hanging up in hook hanger?) gives appearance of positive orientation and collet latch in hook hanger, two attempts, third attempt turn LEM 1/2 turn, work down to proper depth of 6345' Drop ball, pump 4 bpm at 713 psi for 30 bbls, pump 2 bpm at 236 psi for 11 bbls, pump 1 bpm at 100 psi until ball seated, pressure up to 4000 psi to set ZXP packer, pick up to 135K UP WT, pick up 10' to release rotating dogs, rotate setting dogs at 20 rpm, to verify packer set, pressure test annulus to 1500 psi for 10 minutes, charted, top of ZXP packer at 6173.40 I PJSM with BAKER rep and rig crew, pressure up to 3000 psi with rig pump, pressure up to 5200 psi with test pump, blow ball seat Circulate bottoms up at 114 spm, 1217 psi, monitor wellbore, pump dry job Printed: 5/312004 8:46:01 AM ) ) 68 EXPÞOffi~II()(\J :... ·.º¡PE!tétliº.O'ª',$µmQ1~rYReport '.~,::{,. : Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES .','"..'. 'Task GodèNPT Phase 4/21/2004 20:30 - 00:00 3.50 RUNCOMN DFAL COMP 4/22/2004 00:00 - 03:00 3.00 RUNCOW COMP 03:00 - 03:30 0.50 RUNCOW COMP 03:30 - 04:30 1.00 STWHIP N DFAL WEXIT 04:30 - 13:00 8.50 STWHIP N DFAL WEXIT 13:00 - 14:30 1.50 STWHIP N DFAL WEXIT 14:30 - 15:00 0.50 STWHIP P WEXIT 15:00 - 15:30 0.50 STWHIP P WEXIT 15:30 - 17:00 1.50 WHIP P WEXIT 17:00 -18:00 1.00 WHIP P WEXIT 18:00 - 20:30 2.50 WHIP P WEXIT 20:30 - 21 :00 0.50 WHIP P WEXIT 21 :00 - 21 :30 0.50 WHIP P WEXIT 21 :30·00:00 2.50 STWHIP P WEXIT 4/23/2004 00:00 - 02:00 2.00 STWHIP P WEXIT 02:00 - 02:30 0.50 STWHIP P WEXIT 02:30 - 03:00 0.50 STWHIP P WEXIT 03:00 - 05:00 2.00 STWHIP P WEXIT 05:00 - 07:00 2.00 STWHIP P WEXIT 07:00 - 07:30 0.50 STWHIP P WEXIT 07:30 - 08:00 0.50 STWHIP P WEXIT 08:00 - 09:00 1.00 DRILL P WEXIT 09:00 - 09:30 0.50 DRILL P WEXIT 09:30 - 10:00 0.50 DRILL P WEXIT 10:00 - 12:00 2.00 DRILL P WEXIT 12:00 - 13:00 1.00 DRILL P WEXIT 13:00 - 14:00 1.00 DRILL P WEXIT 14:00 - 14:30 0.50 DRILL P WEXIT 14:30 - 00:00 9.50 DRILL P PROD4 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 . ." .' "",, :. ' ,', .:",: ..~ . , , , . . . . Description of Operåtions POH, lay down 192 jts DP to pipe shed, 133K UP WT, 95K DNWT Trip out laying down drill pipe and HWDP for hard banding wear. Lay down LEM running tools Trip in 10 stands drillpipe from derrick, lay down same for hardbanding wear Pick up, make up, trip in drillpipe 1 x 1 to replace layed out drillpipe Trip out racking back 42 stands of drillpipe Clear and clean rig floor Rig service, service top drive and crown PJSM, Baker rep and rig crew, p/u, m/u, seal and whipstock assembly, orient same RIH with DCs and HWDP, 90 seconds per stand RIH with drillpipe at 90 seconds per stand Orient whipstock at 14 degrees left of high side, set anchor with 15K down at 6185', pick up to 145K, slack off to 35K, shear starting mill off whipstock at 42K Pressure test casing to 1500 psi for 5 minutes, circulate and record SPRs Begin milling at 6025', TOW, to 6031' 7K WOB, 135K UP WT, 90K DN WT, 107K RT WT, 290 GPM, 1798 PSI, 100 RPM, 7 - 8 TO Adding 200 bbls of new 9.2 ppg MOBM to active system while milling Mill window from 6031 to 6050', TOW 6025', BOW 6037', open hole from 6037' to 6050' 7 -10K WOB, 135K UP WT, 90K DN WT, 107K RT WT, 290 GPM, 1798 PSI, 100 RPM, 8 - 9 TO Circulate 50 bbl high vis pill, 60% increase in cuttings when pill at shaker FIT test to 12 ppg mud, applied surface pressure 650 psi, mud weight 9.3 ppg, TVD 4440', pressure bled down from 650 psi to 600 psi in 7 minutes, then held steady Monitor wellbore, pump dry job, trip out with mill BHA Stand back HWDP, lay down DCs, lay down milling BHA, mills in guage Clean and clear rig floor Flush stack with ported sub PJSM, PU, MU, bit # 4, BHA # 13 PJSM, load source in directional BHA RIH with BHA, shallow test MWD at 1500' RI H to 5932', fill pipe Rig service, slip and cut drilling line Rig service, service top drive, crown Break circulation, orient to 10 degree left of high side, obtain baseline ECD mud weight 9.2 ppg, ECD 10.03 ppg Directional drill from 6050' to 6773' 116KUPWT, 82KDNWT, 105KRTWT, SPM113, GPM 280, RPM 40 TO ON 5.3, TQ OFF 3.5, Cal ECD 10.13, Act ECD 10.46 Printed: 51312004 8:46:01 AM BP·.EXPLORATION Operati opsSu rn l11~ryReport Page 30 of. 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From-To Hours Task Code NPT Phase Description of Operations 4/24/2004 00:00 - 03:00 3.00 DRILL P PROD4 Directional drill from 6773' to 7147' 114 SPM, 290 GPM, 40 RPM, 9 - 11 TO ON, 8.7 TO OFF, 03:00 - 04:00 1.00 DRILL N DFAL PROD4 Problems with MWD survey accuracy, a large difference from surveys and corrected surveys, roll test MWD, talk with Anadrill directional engineer about survey accuracy, decision to drill ahead 04:00 - 12:00 8.00 DRILL P PROD4 Directional drill from 7147' to 7981' 113 SPM, 276 GPM, 2500 PSi, 40 RPM, 10 - 11 TO ON, 8.9 TO OFF, Cal ECD 10.26, Act ECD 10.95, AST 1.24, A TR 3.02 12:00 - 17:00 5.00 DRILL P PROD4 Directional drill from 7981' to 8630; 113 SPM, 273 GPM, 2540 PSI, 80 RPM, 6 TO ON, 5.5 TO OFF, Cal ECD 10.42, Act ECD 11.17 17:00 - 18:30 1.50 DRILL P PROD4 Circulate to lower ECD from 0.8 over to 0.6 over calculated ECD of 10.42 18:30 - 00:00 5.50 DRILL P PROD4 Directional drill from 8630' to 8848' 113 SPM, 273 GPM, 2510 PSI, 40 RPM, 6TOON,5TO OFF, Cal ECD 10.42, Act ECD 10.52 126K UP, 82K DN, 104K RT WT AST 2.72, ART 0.16 4/25/2004 00:00 - 02:30 2.50 DRILL P PROD4 Directional drill from 8848' to 8978' 127K UP, 83K DN, 104K RT WT, 6 TO ON, 5 TO OFF 113 SPM, 273 GPM, 5 - 20 WOS, 2520 PSI ON, 2430 PSI OFF, AST 2.9, ART 1.1 02:30 - 03:00 0.50 DRILL P PROD4 At 8978' wellbore crossed fault, consult with Anchorage geology team, decision to steer well bore up to locate shales for drilling TVD 03:00 - 05:30 2.50 DRILL C PROD4 Directional drill from 8978' to 9378', Steer well bore to 99 degrees high side, rotate out, drill ahead as per geology instructions, 05:30 - 13:30 8.00 DRILL C PROD4 Circulate wellbore, consult with Anchorage geology team: Did not intend to cross 50' throw fault in this location in the polygon. Had to discuss polygon development options prior to proceeding. 13:30 - 14:30 1.00 DRILL C PROD4 Trip out from 9378' to 8715', 150K UP, 73K DN 14:30 - 15:00 0.50 DRILL C PROD4 Start trenching from 8715' to 8733', 160 degree left, 113SPM, 280 GPM, 2440 PSI 15:00 - 00:00 9.00 DRILL C PROD4 Directional drill from 8733' to 9191', 113 SPM, 280 GPM, 2620 PSI ON, 2560 PSI OFF, 40 RPM 144K UP, 69K DN, 101 RT, Cal ECD 10.66, Act ECD 11.15, AST 4.17, ART 0.13 4/26/2004 00:00 - 02:30 2.50 DRILL C PROD4 Directional drill from 9191' to 9378' MD as per new geological prognosis. 02:30 - 04:00 1.50 DRILL P PROD4 Directional drill from 9378' to 9486' 2720 PSI ON, 2540 PSI OFF, 6.7 TO ON, 6.1 TO OFF, 5- 8K WOS 142K UP, 82K DN, 100K RT, Cal ECD 10.83, Act ECD 11.22 04:00 - 05:00 1.00 DRILL P PROD4 Circulate wellbore, consult with Anchorage geology team 05:00 - 09:00 4.00 DRILL P PROD4 Directional drill from 9486' to 9860' TD for L3 Printed: 5/3/2004 8:46:01 AM ) ) ~.¡ '.'.:..,..,...,:[..,:..'.....,.. .,...":;..:~.P',.,.,f2XP8~~:~~I.p,~;¡...,......:..'",, .,.:.!...'..,:,.:....'.',., Oþératlóns,'Sl,Irn,1118ryReport Circulate at 280 gpm, with 100 RPM for max well bore cleaning, calculated ECD 10.87, drop actual ECD to 11.17, 0.3 ppg over calculated Wiper trip, monitor wellbore, pull 5 stands, pump dry job, 143k UP, 84K DN, trip to window, pull 15K over at 8940, 8845, 8225,8585, wipe clean, ok, pull 20K over at 8758,8565, pump 125 GPM with 40 RPM, wipe clean, ok Rig service, service top drive Orient high side, slide through window with no pump, trip in to 8680', orient 145 left, slide through open hole side track, trip in to 9845', pick up single and wash to bottom at 9860' Circulate to lower ECD and clean wellbore, drop actual ecd from 11.87 to 11.05, 0.2 over calculated of 10.89 ppg 113 SPM, 280 GPM, 2610 PSI, 100 RPM, Trip out, monitor wellbore, pull 5 stands, 143K UP, 84K DN, pump dry job, trip out Trip out of well bore to place circulating sub at window, well bore in good condition, no wiping during trip Orient to 14 deg LHS. Drop Circ-Sub opening ball, Pump at 450 GPM, 2320 PSI, wash whipstock twice, 50 % increase in cuttings at shakers during first bottoms up, 4 bottoms up to clean casing, Flow check. Well static. Pump slug. Continue POOH to top of BHA. SAFETY --- Held PJSM with rig crew & Anadrill personnel regarding removing the RA Source & UD BHA. Remove RA Source. UD all Anadrill Directional tools & bit. Clear & clean rig floor. SAFETY m Held PJSM with rig crew, Anadrill & Baker personnel regarding M/U Whipstock retrieving tool (WSRT) & BHA. M/U WSRT & BHA which consists of the following: Whipstock Hook retrieving tool + 1 Jt of 3.5" HWDP + FS + MWD + Bumper-Sub + Oil Jar + 12 x 4-3/4" DC + XO + 24 x 4" HWDP = 1199.63'. Shallow test MWD-OK. COMP TIH with WSRT BHA on 4" DP to 5975'. COMP M/U TDS. Break circulation. Stage pumps to 280 gpm w/1675 psi. Orient WSRT to 14 deg LHS. (P/U Wt 130k S/O Wt 94k). Slack off on drill string to 6030'. P/U & engage whipstock. Pull on whipstock with 60k overpull, no release. Jar on whipstock 1 time with 95k over pull & release whipstock. P/U & pull seals out of L2 tie-back receptacle. Pull whipstock up to 6000' (P/U Wt = 136k). Monitor well 5 minutes. Annulus level fell +/- 30'. Fill hole with 8 bbl of mud. COMP POOH 5 stds. Pump slug. Continue POOH with whipstock assembly #3 to top of BHA. COMP Stand back 4" HWDP & 4-314" DC. UD MWD, Whipstock retrieving tool, L3 Whipstock & 3.5· DP space-out assembly. 100% recovery of all Whipstock & downhole tools. Clear & clean rig floor. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES , Date From - To Hours Task Code NPT. Phas.e 4/26/2004 05:00 - 09:00 4.00 DRILL P PROD4 09:00 - 12:30 3.50 DRILL P PROD4 12:30 - 17:00 4.50 DRILL P PROD4 17:00 - 17:30 0.50 DRILL P PROD4 17:30 - 20:30 3.00 DRILL P PROD4 20:30 - 22:30 2.00 DRILL P PROD4 22:30 - 00:00 1.50 DRILL P PROD4 4/27/2004 00:00 - 02:00 2.00 DRILL P PROD4 02:00 ~ 03:30 1.50 DRILL P PROD4 03:30 - 04:00 0.50 DRILL P PROD4 04:00 - 06:00 2.00 DRILL P PROD4 06:00 - 06:30 0.50 DRILL P PROD4 06:30 - 08:00 1.50 DRILL P PROD4 08:00 - 08:30 0.50 DRILL P PROD4 08:30 - 09:00 0.50 STWHIP P COMP 09:00 - 10:30 1.50 STWHIP P COMP 10:30 - 13:00 13:00 - 13:30 2.50 STWHIP P 0.50 STWHIP P 13:30 - 17:00 3.50 STWHIP P 17:00 - 19:30 2.50 STWHIP P Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Description of Operations 7.5 TQ ON, 7.0 TQ OFF, 5 - 10K WOB, Cal ECD 10.90, Act ECD 11.43 Printed: 5/312004 8:46:01 AM BP EXPLORATION Operations Summary Report Page 32 of 34 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L -201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From - To Hours Task Code NPT Phase . Descriptionçf@peratiops 4/27/2004 19:30 - 20:30 1.00 CASE P COMP Rig up Hydraulic Casing Tongs & related equipment to run 4.5" Slotted Production Liner. 20:30 - 21:45 1.25 CASE P COMP SAFETY --- Held PJSM with rig crew & Baker Service Reps on running 4.5" Liner & M/U Hook-Hanger assembly. 21 :45 - 00:00 2.25 CASE P COMP M/U 4-1/2" Float Shoe (Bent) Jt + 87 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner to 3672'. M/U Torque = 3200 FtLb 4/28/2004 00:00 - 00:30 0.50 CASE P COMP Finish M/U 4-1/2" Float Shoe (Bent) Jt + 89 Jts of 4-1/2" 12.6#, L-80, IBT-M slotted liner + 1 Jt of solid liner + XO Pup Jt & BOT Flanged Hook Hanger assembly. Total length = 3825.29' M/U Torque = 3200 FtLb P/U Wt = 72k --S/O Wt = 60k-- Theoretical Liner Wt in mud = 41 ,500 Lbs 00:30 - 01 :00 0.50 CASE P COMP Change elevators to fit 4" DP. RID Hydraulic Casing Tongs & related equipment. 01 :00 - 02:15 1.25 CASE P COMP Continue RIH with 4-1/2" slotted liner on 25 Stds of 4" DP. Tag up @ 6184' on L2 L TP. P/U 105k SIO 80k 02: 15 - 02:45 0.50 CASE P COMP POOH to 6020'. Apply 1/4 RH turn in string. Reciprocate string to relax torque. TIH with the 4-1/2" slotted liner. Tag up @ 6184'. POOH to 6020'. Apply another 1/4 turn. TIH successfully entering the L3 lateral @ 6037". 02:45 - 04:45 2.00 CASE P COMP Continue TIH. Tag up @ 9380' indicating that the 4.5" Liner did not enter the open hole sidetrack in the L3 lateral @ 8715'. Original hole hole depth 9378'. 04:45 - 06:30 1.75 CASE P COMP POOH to 8700'. Apply 1/2 turn to right while pick up. TIH successfully entering the open hole sidetrack in the L3 lateral @ 8715'. Conitinue TIH to 9845'. Engage hook hanger on bottom of window @ 6037' on first attempt. 06:30 - 08:00 1.50 CASE P COMP PU 10' above window and rotate string 1/2 turn. Slack-off and run Hook-Hanger 10' below btm of window - OK. P/U string with Hook-Hanger 10' above window. Re-orient hook hanger and Land out with Hook-Hanger on bottom of window @ 6037-0K. P/U Wt = 150k SIO Wt = 85k, Set down 20k on top of hanger. Shoe at 9845'. Top of hook hanger at 6020'. Drop 29/32" ball & pump on seat. Pressure up to 3000 psi to release HWH Running tool. P/U Drill string 10' & verify HWH Running tool released. Lost 37k string wt. Set back down & tag Hook-Hanger with 25k-0K. P/U on string with Running Tool above Hook-Hanger. R/U Side Entry Pump-in sub into the 4" DP. Pressure up to 4900 psi & blow ball seat. RID pump-in sub. M/U TDS. 08:00 - 09:30 1.50 CASE P COMP P/U on string placing end of DP @ 6000'. CBU @ 6 bpm wi 1100 psi. Flow check. Pump slug. 09:30 - 12:30 3.00 CASE P COMP POOH with 4" DP. UD Baker's Liner Running Tool. 12:30 - 13:00 0.50 CASE P COMP R/U Handling tools for LEM. 13:00 - 13:30 0.50 CASE P COMP SAFETY --- Held PJSM with rig crew & Baker on picking up & running LEM assembly. 13:30 - 18:30 5.00 CASE P COMP P/U ZXP Packer/LEM assembly. TIH with same on 4" DP to 6006'. P/U 134k SIO 93k Printed: 5/312004 8:46:01 AM ) ') ···.····.·.··::;..~P.··.EXP~Q.g~1JON , '," "."" '.,',. . ' , ...... :..··.··:,··<··:Q:þe~·~ti..º.riS...·..·s.y.··iw1:.ro.ªry.:.···R·~·pºr~······ ...'.. ,'.. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES ·Oaté ':"'''':'''':''''':;'''".:'." ,P:të>r1"1~;·TEc>· HoUrs Task: Code,. N PT . Phase 4/28/2004 1.50 CASE P COMP 18:30 - 20:00 20:00 - 20:30 0.50 CASE P COMP 20:30 - 21 :00 0.50 CASE P COMP 21 :00 - 23:00 2.00 CASE P COMP 23:00 - 00:00 1.00 CASE P COMP 4/29/2004 00:00 - 01 :00 1.00 CASE P COMP 01 :00 - 01 :30 0.50 CASE P COMP 01 :30 - 06:30 5.00 CASE P COMP 06:30 - 08:30 2.00 CASE P COMP 08:30 - 14:00 5.50 CASE P COMP 14:00 - 14:30 0.50 WHSUR P COMP 14:30 - 16:00 1.50 WHSUR P COMP 16:00 - 16:30 0.50 RUNCOW COMP 16:30 - 00:00 7.50 RUNCOW COMP 4/30/2004 3.00 RUNCOW COMP 00:00 - 03:00 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 DescriptionofOperåtions .. Continue RIH. Sting seal assembly into Seal Bore Extension @ 6196' & Land LEM in Hook-Hanger @ 6020'. P/U 10k over string weight to verify LEM engaged-OK. Drop the 29/32· setting ball and pump on seat @ 164 gpm wi 680 psi. Pressure up to 2500 psi, wait 2 minutes, then increased pressure to 4000. P/U on string. Packer Setting tool free. P/U 10' & position the rotating Dog Sub above the ZXP Tie-back sleeve. Rotate string at 10 rpm. Slack off on string & set down 50klbs on ZXP Packer. P/U 15'. RlU & blow ball seat with 5075 psi. NOTE: Top of "L3" ZXP Packer @ 5981' MDRKB. P/U on string & place LEM Running tool @ 5980'. CBU with 346 GPM @ 1760 PSI. Displace well to 9.3 ppg brine from 5980'. Pumped the following sweeps: 25 bbls L VT -200 base oil 25 bbls viscosified 9.3 ppg brine 50 bbls 9.3 ppg brine with 4 drums Safe Surf 0 25 bbls viscosified 9.3 ppg brine Follow the sweeps with 290 bbls 9.3 ppg brine until clean returns. 430 gpm, 2025 psi. Note: 170 bbls Versacoat left in hole. Load MOBM on trucks. Clean MOBM from rotary table, sumps, shakers, pits & mud return line. Finish cleaning pits & surface equipment of MOBM. Service TDS. POOH. Lay down 150 Jts of 4" DP + 12 x 4.75· DC & BOT LEM Running Tool. TIH with 8 Std of 4" HWDP + 50 Std of 4" DP from derrick to 5407' POOH. UD 150 Jts of 4" DP + 24 Jts of 4" HWDP. Clear rig floor of excess drilling equipment. Flush BOP Stack. Pull wear bushing. RIU 4.5" tbg running equipment. RlU control line spool & hang sheave for running I-wire. P/U tbg hanger & make dummy run. UD same. SAFETY--- Held PJSM with BOT, Centrilift, Cameo, Nabors Casing and all rig personnel on making up and running completion string. Run 75 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with jewelry as per running orders. MIU and run I-wire for Phoenix pressure sensor. Check sensor and I-wire every 1000' of tbg run. Install 1 control line clamp per tbg joint for the 1 st 10 joints, then 1 clamp every 2 joints. Midnight depth = 3361'. Finish running 4.5" Production String from 3361'. Ran a total of 136 joints of 4-1/2", 12.6#, L-80, IBT-M completion tubing with jewelry as per running orders. Check sensor and I-wire every 1000'. Install 1 control line clamp per tbg joint for the 1 st 10 joints, then 1 clamp every 2 joints to surface - 75 total clamps run. Printed: 51312004 8:46:01 AM Legal Well Name: Camman Well Name: Event Name: Cantractar Name: Rig Name: BPEXPLQRATION ()p~ra~j<)rl~S.Uml11ary.. 8eport L - 201 L-201 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Page 34 af 34 Start: 3/16/2004 Rig Release: 4/30/2004 Rig Number: Spud Date: 3/17/2004 End: 4/30/2004 Date From'" To. Haurs Task Go.de NPT Phase 4/30/2004 03:00 - 05:00 2.00 RUNCOrvP COMP 05:00 - 07:00 07:00 - 09:00 2.00 RUNCOrvP COMP 2.00 RUNCOrvP COMP 09:00 - 09:30 0.50 RUNCOrvP COMP 09:30 - 12:00 2.50 BOPSUF P COMP 12:00 - 15:00 3.00 WHSUR P COMP 15:00 ~ 16:00 1.00 WHSUR P CaMP 16:00 - 19:30 3.50 WHSUR P COMP 19:30 - 20:00 20:00 - 21 :00 21 :00 - 22:00 0.50 WHSUR P CaMP 1.00 WHSUR P 1.00 WHSUR P COMP COMP Descriptian af Qperations Tag up on NO-GO @ 6001'. M/U space out pups. Run I-wire through hanger & secure. Shell test Tubing Hanger to 5000 psi-OK. Land Tubing Hanger in wellhead. Space out tbg 2' above NO-GO placing the mule shoe at 5999'. RILDS and test I-wire-OK. Reverse circulate 94 bbls clean brine followed by 3 bbls corrosion inhibited brine, followed by 158 bbls clean brine. Placing corrosion inhibited brine between packer and lower GLM. 3 bpm @ 150 psi. Drop 1-7/8" ball-rod & let gravitate on seat. Pressure up tubing to 4500 psi to set packer. Bleed pressure to 3500 psi and hold for 30 minutes for tbg test. Bleed tbg pressure to 2500 psi and pressure up annulus to 3500 psi, hold for 30 minute for annular and packer test. Bleed both tbg and annulus pressure to 0 psi. Pressure up annulus, DCK valve sheared at 3000 psi. Circulate through the tubing to ensure DCK was open. UD 4.5" tubing landing joint. Install TWCV. UD Mouse Hole, pull Bell-nipple. NID BOP. N/U FMC 11" 5K x 4-1/16" 5K Tubing head adapter. Terminate I-Wire through adapter flange. N/U 4-1/16" 5K Production Tree. Test tubing head adapter & tree to 5000 psi. Test was API. R/U DSM lubricator. Pull TWCV. Held PJSM with Rig Crew & Little Red Hot Oil Service rep regarding freeze protecting operations. R/U Hot Oil & test lines to 2000 psi. Freeze protect 4.5" x 7 5/8" annulus. Reverse circulate 150 bbl of diesel down 4.5" x 75/8" annulus @ 2 bpm with 1250 psi. Let well U-Tube & equalize. DSM install BPV in Tubing Hanger. Test to 1000 psi form below. RID Hot Oil Line. DSM install VR Plugs in Tubing Spool outlets. Install needle valves & gauges on wellhead wing valve outlets. Secure well. Clean up cellar area. Release Rig @ 22:00 Hrs April 30, 2004 Printed: 5/312004 8:46:01 AM ) ') bp L-201 L3 Survey Report Schlumberger Report Date: 26-Apr-04 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 130.000· Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: L-PAD / N-U TVD Reference Datum: Rotary Table Well: L-201 TVD Reference Elevation: 78.70 ft relative to MSL Borehole: L·201 L3 Sea Bed I Ground Level Elevation: 50.20 ft relative to MSL UWI/API#: 500292320262 Magnetic Declination: 24.980· Survey Name / Date: L-201 L3/ April 26, 2004 Total Field Strength: 57562.697 nT Torti AHD I DDII ERD ratio: 360.625· 17541.80 ft/6.777 11.682 Magnetic Dip: 80.824· Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 29, 2004 Location LatlLong: N 70.35073717, W 149.32347531 Magnetic Declination Model: BGGM 2003 Location Grid N/E Y/X: N 5978320.840 ftUS, E 583325.340 ftUS North Reference: True North Grid Convergence Angle: +0.63713312· Total Corr Mag North -> True North: +24.980· Grid Scale Factor: 0.99990789 Local Coordinates Referenced To: Well Head Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( deg/1 00 ft ) ( deg/100 ft ) (deg/100 ft) (ftUS) (ftUS) 0.00 0.00 0.00 -78.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5978320.84 583325.34 N 70.35073717 W 149.32347531 124.00 0.22 237.38 45.30 124.00 -0.07 0.24 -0.13 -0.20 0.18 0.18 0.00 5978320.71 583325.14 N 70.35073682 W 149.32347694 224.00 0.52 340.14 145.30 224.00 -0.52 0.75 0.19 -0.52 0.61 0.30 1 02.76 5978321.03 583324.82 N 70.35073770 W 149.32347951 324.00 2.13 19.40 245.27 323.97 -1.57 3.00 2.37 -0.05 1.76 1.61 39.26 5978323.21 583325.26 N 70.35074366 W 149.32347575 395.00 4.15 21.01 316.16 394.86 -2.87 6.89 6.02 1.31 2.85 2.85 2.27 5978326.87 583326.58 N 70.35075361 W 149.32346471 495.00 5.88 17.19 415.77 494.47 -6.03 15.63 14.29 4.12 1.76 1.73 -3.82 5978335.17 583329.30 N 70.35077621 W 149.32344189 595.00 8.86 11.46 514.94 593.64 -11.70 28.45 26.73 7.16 3.07 2.98 -5.73 5978347.65 583332.20 N 70.35081020 W 149.32341717 695.00 11.87 12.48 613.29 691.99 -20.13 46.44 44.33 10.92 3.02 3.01 1.02 5978365.28 583335.76 N 70.35085827 W 149.32338670 758.99 14.48 14.62 675.59 754.29 -26.60 61.02 58.50 14.36 4.15 4.08 3.34 5978379.49 583339.05 N 70.35089697 W 149.32335876 853.05 17.37 16.52 766.04 844.74 -37.24 86.82 83.34 21.32 3.12 3.07 2.02 5978404.41 583345.73 N 70.35096485 W 149.32330224 947.46 19.62 16.37 855.56 934.26 -49.21 116.77 112.06 29.80 2.38 2.38 -0.16 5978433.22 583353.88 N 70.35104332 W 149.32323343 1040.82 22.84 16.89 942.58 1021.28 -62.61 150.57 144.45 39.48 3.45 3.45 0.56 5978465.71 583363.21 N 70.35113179 W 149.32315481 1132.91 25.75 16.87 1026.50 1105.20 -77.48 188.45 180.70 50.48 3.16 3.16 -0.02 5978502.07 583373.80 N 70.35123083 W 149.32306550 1226.13 27.99 17.46 1109.65 1188.35 -93.82 230.58 220.95 62.92 2.42 2.40 0.63 5978542.46 583385.79 N 70.35134079 W 149.32296450 1321.50 29.42 18.07 1193.30 1272.00 -111.15 276.39 264.57 76.90 1.53 1.50 0.64 5978586.22 583399.29 N 70.35145995 W 149.32285099 1416.81 31.11 18.21 1275.62 1354.32 -129.04 324.42 310.22 91.86 1.77 1.77 0.15 5978632.03 583413.74 N 70.35158465 W 149.32272956 1511.08 32.79 18.97 1355.60 1434.30 -147.24 374.31 357.49 107.77 1.83 1.78 0.81 5978679.48 583429.12 N 70.35171381 W 149.32260040 1604.81 34.13 19.21 1433.80 1512.50 -165.68 425.98 406.33 124.67 1.44 1.43 0.26 5978728.49 583445.47 N 70.35184722 W 149.32246316 1699.54 33.73 19.32 1512.40 1591.10 -184.40 478.86 456.24 142.12 0.43 -0.42 0.12 5978778.59 583462.36 N 70.35198358 W 149.32232152 1797.56 36.27 18.62 1592.68 1671.38 -204.58 535.08 509.41 160.38 2.62 2.59 -0.71 5978831.96 583480.03 N 70.35212883 W 149.32217323 1892.80 37.18 18.91 1669.02 1747.72 -225.21 592.03 563.33 178.70 0.97 0.96 0.30 5978886.07 583497.75 N 70.35227614 W 149.32202448 1988.07 39.87 19.15 1743.55 1822.25 -246.44 651.36 619.42 198.05 2.83 2.82 0.25 5978942.37 583516.48 N 70.35242937 W 149.32186737 2081.93 41.57 20.11 1814.68 1893.38 -267.74 712.59 677.09 218.63 1.93 1.81 1.02 5979000.26 583536.41 N 70.35258691 W 149.32170029 2175.78 42.75 19.75 1884.25 1962.95 -289.36 775.58 736.31 240.10 1.28 1.26 -0.38 5979059.70 583557.22 N 70.35274869 W 149.32152597 2269.96 45.03 20.88 1952.12 2030.82 -311.34 840.87 797.53 262.78 2.56 2.42 1.20 5979121.17 583579.21 N 70.35291593 W 149.32134182 2361.74 45.50 21.16 2016.71 2095.41 -332.55 906.07 858.39 286.17 0.56 0.51 0.31 5979182.28 583601.92 N 70.35308219 W 149.32115193 2458.33 47.95 21.23 2082.92 2161.62 -355.21 976.38 923.95 311.59 2.54 2.54 0.07 5979248.11 583626.61 N 70.35326130 W 149.32094549 2552.24 48.94 21.51 2145.22 2223.92 -377.66 1046.66 989.39 337.20 1.08 1.05 0.30 5979313.83 583651.48 N 70.35344008 W 149.32073755 2645.64 49.74 21.45 2206.07 2284.77 -400.17 1117.51 1055.32 363.14 0.86 0.86 -0.06 5979380.04 583676.69 N 70.35362019 W 149.32052688 2740.10 50.69 21.63 2266.52 2345.22 -423.15 1190.10 1122.84 389.79 1.02 1.01 0.19 5979447.84 583702.59 N 70.35380464 W 149.32031046 2834.26 50.10 21.09 2326.54 2405.24 -446.34 1262.64 1190.40 416.22 0.77 -0.63 -0.57 5979515.68 583728.26 N 70.35398921 W 149.32009588 2928.38 49.29 22.08 2387.43 2466.13 -469.01 1334.42 1257.15 442.62 1.18 -0.86 1.05 5979582.71 583753.91 N 70.35417154 W 149.31988149 3022.90 49.04 23.22 2449.23 2527.93 -490.34 1405.93 1323.14 470.16 0.95 -0.26 1.21 5979649.00 583780.71 N 70.35435183 W 149.31965786 3117.47 48.89 23.30 2511.32 2590.02 -510.89 1477.27 1388.68 498.33 0.17 -0.16 0.08 5979714.84 583808.15 N 70.35453086 W 149.31942910 3152.16 49.11 23.20 2534.08 2612.78 -518.43 1503.45 1412.73 508.66 0.67 0.63 -0.29 5979739.01 583818.21 N 70.35459658 W 149.31934517 3266.50 47.43 25.10 2610.19 2688.89 -541.75 1588.77 1490.59 543.55 1.92 -1.47 1.66 5979817.25 583852.23 N 70.35480928 W 149.31906183 3325.61 49.36 23.06 2649.43 2728.13 -553.88 1632.97 1530.95 561.57 4.16 3.27 -3.45 5979857.79 583869.80 N 70.35491951 W 149.31891549 3420.36 50.09 23.79 2710.69 2789.39 -574.50 1705.25 1597.27 590.31 0.97 0.77 0.77 5979924.43 583897.80 N 70.35510071 W 149.31868208 3515.35 49.54 23.70 2771.98 2850.68 -594.82 1777.82 1663.70 619.53 0.58 -0.58 -0.09 5979991.17 583926.28 N 70.35528217 W 149.31844476 3609.16 49.34 23.32 2832.98 2911.68 -615.05 1849.09 1729.05 647.96 0.37 -0.21 -0.41 5980056.83 583953.98 N 70.35546071 W 149.31821387 3701.35 50.03 21.52 2892.63 2971.33 -636.28 1919.38 1794.03 674.77 1.67 0.75 -1.95 5980122.09 583980.05 N 70.35563821 W 149.31799618 3794.96 50.31 21.39 2952.59 3031.29 -659.14 1991.27 1860.94 701.06 0.32 0.30 -0.14 5980189.28 584005.60 N 70.35582099 W 149.31778262 3888.81 50.23 21.33 3012.57 3091.27 -682.21 2063.45 1928.16 727.35 0.10 -0.09 -0.06 5980256.78 584031.14 N 70.35600462 W 149.31756910 3982.46 49.83 20.65 3072. 73 3151.43 -705.59 2135.22 1995.16 753.06 0.70 -0.43 -0.73 5980324.07 584056.10 N 70.35618767 W 149.31736028 4076.83 49.57 20.57 3133.77 3212.47 -729.49 2207.19 2062.53 778.39 0.28 -0.28 -0.08 5980391.70 584080.68 N 70.35637170 W 149.31715449 4172.21 49.68 19.90 3195.56 3274.26 -754.06 2279.86 2130.71 803.52 0.55 0.12 -0.70 5980460.15 584105.05 N 70.35655795 W 149.31695036 4266.06 48.39 21.00 3257.08 3335.78 -777.78 2350.72 2197.11 828.28 1.63 -1.37 1.17 5980526.82 584129.06 N 70.35673934 W 149.31674930 4360.01 47.90 21.14 3319.77 3398.47 -800.48 2420.70 2262.41 853.43 0.53 -0.52 0.15 5980592.38 584153.49 N 70.35691772 W 149.31654495 4454.28 47.80 22.75 3383.03 3461.73 -822.14 2490.59 2327.23 879.55 1.27 -0.11 1.71 5980657.49 584178.88 N 70.35709480 W 149.31633280 4548.11 48.18 26.94 3445.85 3524.55 -840.35 2560.29 2390.47 908.84 3.34 0.40 4.47 5980721.04 584207.46 N 70.35726755 W 149.31609491 4641.89 48.96 31.87 3507.92 3586.62 -853.25 2630.58 2451.68 943.36 4.03 0.83 5.26 5980782.62 584241.29 N 70.35743475 W 149.31581454 4735.40 48.79 36.31 3569.44 3648.14 -860.51 2701.01 2509.98 982.82 3.58 -0.18 4.75 5980841.36 584280.10 N 70.35759404 W 149.31549403 4829.57 48.97 40.88 3631.39 3710.09 -862.24 2771.93 2565.40 1027.05 3.66 0.19 4.85 5980897.26 584323.71 N 70.35774541 W 149.31513475 4923.41 48.83 47.15 3693.11 3771.81 -857.30 2842.62 2616.21 1076.14 5.04 -0.15 6.68 5980948.61 584372.22 N 70.35788420 W 149.31473606 SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31 rt-546 ) N-UIL-201IL-201 L31L-201 L3 Generated 5/5/2004 2:00 PM Page 1 of 3 ) ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (It ) (deg) (deg) (It ) (It ) (It ) (It ) (It) (It ) ( deg/100 It ) (deg/100 It) (deg/100 It) (ltUS) (ltUS) 5016.44 49.09 54.19 3754.24 3832.94 -844.31 2912.75 2660.62 1130.36 5.71 0.28 7.57 5980993.62 584425.94 N 70.35800551 W 149.31429571 5110.60 48.23 58.33 3816.45 3895.15 -824.54 2983.43 2699.89 1189.11 3.42 -0.91 4.40 5981033.53 584484.25 N 70.35811275 W 149.31381851 5204.87 49.16 62.86 3878.69 3957.39 -799.63 3054.23 2734.62 1250.78 3.74 0.99 4.81 5981068.94 584545.52 N 70.35820761 W 149.31331763 5298.92 47.75 68.46 3941.09 4019.79 -769.20 3124.59 2763.65 1314.85 4.70 -1.50 5.95 5981098.67 584609.26 N 70.35828687 W 149.31279728 5392.93 49.39 73.49 4003.32 4082.02 -732.92 3195.05 2786.57 1381.46 4.37 1.74 5.35 5981122.34 584675.60 N 70.35834947 W 149.31225633 5487.16 51.11 80.03 4063.61 4142.31 -689.56 3267.47 2803.10 1451.92 5.64 1.83 6.94 5981139.64 584745.86 N 70.35839458 W 149.31168408 5582.88 53.94 84.88 4121.86 4200.56 -638.27 3343.41 2813.00 1527.19 4.99 2.96 5.07 5981150.39 584821.01 N 70.35842161 W 149.31107280 5677.97 56.15 89.22 4176.36 4255.06 -581.23 3421.33 2816.97 1604.99 4.40 2.32 4.56 5981155.22 584898.75 N 70.35843241 W 149.31044097 5769.98 58.26 91.53 4226.20 4304.90 -521.65 3498.66 2816.45 1682.32 3.12 2.29 2.51 5981155.56 584976.08 N 70.35843093 W 149.30981296 5862.16 59.02 94.81 4274.18 4352.88 -458.65 3577.37 2812.09 1760.89 3.15 0.82 3.56 5981152.07 585054.69 N 70.35841896 W 149.30917484 5955.46 61.37 98.97 4320.56 4399.26 -390.85 3658.32 2802.35 1841.23 4.62 2.52 4.46 5981143.22 585135.12 N 70.35839229 W 149.30852243 6025.00 63.75 101.66 4352.61 4431.31 -337.24 3720.02 2791.28 1901.93 4.85 3.42 3.87 5981132.83 585195.94 N 70.35836203 W 149.30802947 6037.00 65.61 102.17 4357.74 4436.44 -327.67 3730.87 2789.04 1912.55 15.97 15.50 4.25 5981130.71 585206.58 N 70.35835590 W 149.30794329 6067.17 69.45 102.59 4369.27 4447.97 -302.97 3758.75 2783.06 1939.77 12.79 12.73 1.39 5981125.04 585233.87 N 70.35833955 W 149.30772220 6098.49 73.46 103.02 4379.23 4457.93 -276.56 3788.43 2776.48 1968.72 12.87 12.80 1.37 5981118.78 585262.88 N 70.35832155 W 149.30748711 6129.29 77.29 1 03.45 4387.01 4465.71 -249.96 3818.23 2769.66 1997.73 12.51 12.44 1.40 5981112.28 585291.96 N 70.35830289 W 149.30725157 6160.61 80.90 103.88 4392.93 4471.63 -222.40 3848.98 2762.40 2027.60 11.60 11.53 1.37 5981105.35 585321.91 N 70.35828302 W 149.30700894 6191.13 83.52 104.30 4397.07 4475.77 -195.20 3879.21 2755.03 2056.93 8.69 8.58 1.38 5981098.32 585351.32 N 70.35826289 W 149.30677080 6223.02 83.49 104.20 4400.67 4479.37 -166.66 3910.90 2747.24 2087.64 0.33 -0.09 -0.31 5981090.86 585382.11 N 70.35824156 W 149.30652142 6254.04 85.41 106.75 4403.68 4482.38 -138.58 3941.77 2739.00 2117.39 10.26 6.19 8.22 5981082.95 585411.95 N 70.35821903 W 149.30627983 6284.62 89.47 108.79 4405.04 4483.74 -110.31 3972.32 2729.68 2146.48 14.85 13.28 6.67 5981073.96 585441.13 N 70.35819354 W 149.30604365 6315.35 93.21 111.40 4404.32 4483.02 -81 .43 4003.03 2719.12 2175.32 14.84 12.17 8.49 5981063.73 585470.09 N 70.35816469 W 149.30580943 6347.35 95.13 111.33 4402.00 4480.70 -51.19 4034.95 2707.50 2205.04 6.00 6.00 -0.22 5981052.43 585499.93 N 70.35813291 W 149.30556810 6378.38 95.10 112.78 4399.23 4477.93 -21.78 4065.85 2695.89 2233.68 4.66 -0.10 4.67 5981041.15 585528.70 N 70.35810118 W 149.30533551 6409.80 95.11 113.80 4396.43 4475.13 8.19 4097.15 2683.52 2262.43 3.23 0.03 3.25 5981029.10 585557.58 N 70.35806735 W 149.30510210 6441.44 95.58 115.26 4393.49 4472.19 38.55 4128.65 2670.44 2291.09 4.83 1.49 4.61 5981016.34 585586.38 N 70.35803160 W 149.30486940 6472.14 94.42 115.42 4390.81 4469.51 68.14 4159.23 2657.35 2318.73 3.81 -3.78 0.52 5981003.56 585614.16 N 70.35799582 W 149.30464497 6503.35 95.03 116.94 4388.24 4466.94 98.34 4190.34 2643.63 2346.64 5.23 1.95 4.87 5980990.15 585642.22 N 70.35795831 W 149.30441833 6534.97 95.27 120.06 4385.40 4464.10 129.20 4221.83 2628.60 2374.31 9.86 0.76 9.87 5980975.43 585670.06 N 70.35791724 W 149.30419364 6565.63 95.17 121.20 4382.61 4461.31 159.32 4252.36 2613.05 2400.58 3.72 -0.33 3.72 5980960.17 585696.50 N 70.35787472 W 149.30398033 6597.06 95.27 122.26 4379.75 4458.45 190.29 4283.66 2596.59 2427.21 3.37 0.32 3.37 5980944.01 585723.30 N 70.35782973 W 149.30376418 6627.98 95.24 122.20 4376.92 4455.62 220.80 4314.45 2580.17 2453.25 0.22 -0.10 -0.19 5980927.88 585749.52 N 70.35778484 W 149.30355271 6658.52 94.72 120.34 4374.27 4452.97 250.87 4344.88 2564.37 2479.26 6.30 -1.70 -6.09 5980912.38 585775.70 N 70.35774168 W 149.30334158 6689.96 92.73 117.86 4372.22 4450.92 281.68 4376.25 2549.12 2506.67 10.10 -6.33 -7.89 5980897.43 585803.27 N 70.35769998 W 149.30311902 6722.28 92.11 118.28 4370.86 4449.56 313.27 4408.54 2533.92 2535.16 2.32 -1.92 1.30 5980882.56 585831.93 N 70.35765844 W 149.30288768 6753.12 92.49 119.35 4369.62 4448.32 343.50 4439.35 2519.07 2562.16 3.68 1.23 3.47 5980868.01 585859.09 N 70.35761784 W 149.30266847 6784.35 92.52 119.42 4368.26 4446.96 374.16 4470.55 2503.76 2589.34 0.24 0.10 0.22 5980853.00 585886.44 N 70.35757599 W 149.30244774 6816.02 92.73 119.54 4366.81 4445.51 405.27 4502.19 2488.19 2616.88 0.76 0.66 0.38 5980837.74 585914.15 N 70.35753343 W 149.30222413 6846.65 92.38 118.96 4365.44 4444.14 435.33 4532.79 2473.24 2643.58 2.21 -1.14 -1.89 5980823.09 585941.01 N 70.35749256 W 149.30200736 6877.53 90.50 121.42 4364.67 4443.37 465.75 4563.66 2457.72 2670.26 10.02 -6.09 7.97 5980807.87 585967.86 N 70.35745013 W 149.30179075 6909.80 90.26 121.06 4364.45 4443.15 497.64 4595.93 2440.99 2697.85 1.34 -0.74 -1.12 5980791.44 585995.63 N 70.35740438 W 149.30156674 6940.05 90.57 118.38 4364.23 4442.93 527.40 4626.18 2425.99 2724.12 8.92 1.02 -8.86 5980776.74 586022.06 N 70.35736339 W 149.30135348 6971.84 90.02 120.46 4364.07 4442.77 558.65 4657.97 2410.38 2751.81 6.77 -1.73 6.54 5980761.44 586049.92 N 70.35732071 W 149.30112867 7002.09 91.29 119.49 4363.72 4442.42 588.43 4688.21 2395.26 2778.01 5.28 4.20 -3.21 5980746.62 586076.28 N 70.35727940 W 149.30091594 7032.71 89.74 120.63 4363.45 4442.15 618.59 4718.83 2379.93 2804.51 6.28 -5.06 3.72 5980731.58 586102.95 N 70.35723747 W 149.30070080 7064.12 89.37 119.22 4363.69 4442.39 649.51 4750.24 2364.26 2831.73 4.64 -1.18 -4.49 5980716.22 586130.34 N 70.35719464 W 149.30047979 7095.24 89.43 119.61 4364.02 4442.72 680.10 4781.36 2348.98 2858.84 1.27 0.19 1.25 5980701.24 586157.61 N 70.35715286 W 149.30025972 7127.33 90.09 120.48 4364.15 4442.85 711.71 4813.45 2332.91 2886.61 3.40 2.06 2.71 5980685.48 586185.56 N 70.35710894 W 149.30003420 7156.37 90.46 120.75 4364.01 4442.71 740.36 4842.49 2318.12 2911.61 1.58 1.27 0.93 5980670.97 586210.72 N 70.35706851 W 149.29983129 7188.49 89.06 122.08 4364.15 4442.85 772.12 4874.61 2301.38 2939.02 6.01 -4.36 4.14 5980654.54 586238.31 N 70.35702274 W 149.29960876 7219.01 88.78 121.55 4364.72 4443.42 802.32 4905.12 2285.29 2964.95 1.96 -0.92 -1.74 5980638.74 586264.41 N 70.35697877 W 149.29939825 7250.14 89.06 122.40 4365.31 4444.01 833.14 4936.25 2268.81 2991.35 2.87 0.90 2.73 5980622.56 586290.99 N 70.35693371 W 149.29918390 7282.07 88.75 121.85 4365.92 4444.62 864.76 4968.17 2251.83 3018.38 1.98 -0.97 -1.72 5980605.88 586318.22 N 70.35688731 W 149.29896441 7312.23 88.54 124.48 4366.63 4445.33 894.70 4998.32 2235.34 3043.62 8.75 -0.70 8.72 5980589.67 586343.63 N 70.35684222 W 149.29875952 7343.68 88.72 121.62 4367.38 4446.08 925.91 5029.76 2218.20 3069.97 9.11 0.57 -9.09 5980572.82 586370.17 N 70.35679535 W 149.29854559 7373.72 88.75 123.81 4368.05 4446.75 955.69 5059.80 2201.97 3095.24 7.29 0.10 7.29 5980556.88 586395.61 N 70.35675098 W 149.29834047 7405.43 90.40 121.45 4368.28 4446.98 987.14 5091.50 2184.87 3121.94 9.08 5.20 -7.44 5980540.08 586422.50 N 70.35670425 W 149.29812369 7436.75 90.53 123.10 4368.03 4446.73 1018.17 5122.82 2168.15 3148.42 5.28 0.42 5.27 5980523.66 586449.16 N 70.35665853 W 149.29790873 7468.41 90.57 121.71 4367.72 4446.42 1049.55 5154.48 2151.18 3175.15 4.39 0.13 -4.39 5980506.99 586476.07 N 70.35661215 W 149.29769174 7499.57 89.95 122.55 4367.58 4446.28 1080.42 5185.64 2134.61 3201.54 3.35 -1.99 2.70 5980490.71 586502.64 N 70.35656685 W 149.29747753 7531.47 89.54 119.47 4367.73 4446.43 1111.92 5217.54 2118.18 3228.87 9.74 -1.29 -9.66 5980474.59 586530.16 N 70.35652193 W 149.29725560 7561.83 88.89 118.27 4368.14 4446.84 1141.71 5247.90 2103.52 3255.46 4.49 -2.14 -3.95 5980460.23 586556.90 N 70.35648185 W 149.29703978 7590.92 88.61 119.15 4368.78 4447.48 1170.23 5276.98 2089.55 3280.96 3.17 -0.96 3.03 5980446.54 586582.56 N 70.35644366 W 149.29683270 7623.38 88.58 118.53 4369.57 4448.27 1202.06 5309.43 2073.90 3309.39 1.91 -0.09 -1.91 5980431.21 586611.15 N 70.35640086 W 149.29660193 7652.38 89.02 116.24 4370.18 4448.88 1230.36 5338.42 2060.56 3335.13 8.04 1.52 -7.90 5980418.16 586637.04 N 70.35636440 W 149.29639294 7683.48 89.09 116.61 4370.69 4449.39 1260.58 5369.52 2046.72 3362.98 1.21 0.23 1.19 5980404.64 586665.04 N 70.35632656 W 149.29616687 7714.85 88.47 116.22 4371.36 4450.06 1291.07 5400.88 2032.77 3391.07 2.33 -1.98 -1.24 5980391.00 586693.28 N 70.35628841 W 149.29593883 7745.61 88.44 116.39 4372.19 4450.89 1320.94 5431.63 2019.14 3418.63 0.56 -0.10 0.55 5980377.68 586720.99 N 70.35625115 W 149.29571505 7774.09 87.68 116.91 4373.15 4451.85 1348.64 5460.10 2006.38 3444.07 3.23 -2.67 1.83 5980365.20 586746.56 N 70.35621624 W 149.29550852 7806.71 87.58 118.22 4374.50 4453.20 1380.46 5492.69 1991.30 3472.96 4.02 -0.31 4.02 5980350.44 586775.62 N 70.35617500 W 149.29527397 7837.79 88.23 119.57 4375.64 4454.34 1410.94 5523.75 1976.29 3500.15 4.82 2.09 4.34 5980335.74 586802.97 N 70.35613397 W 149.29505322 SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31 rt-546 ) N-U\L-201\L-201 L3\L-201 L3 Generated 5/5/2004 2:00 PM Page 2 of 3 ') ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rata Walk Rata Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) ( degf1 00 ft ) ( degf1 00 ft ) ( degf100 ft ) (ftUS) (ftUS) 7867.60 88.27 119.45 4376.55 4455.25 1440.24 5553.54 1961.61 3526.08 0.42 0.13 -0.40 5980321.35 586829.06 N 70.35609384 W 149.29484271 7898.39 88.37 116.56 4377 .45 4456.15 1470.34 5584.32 1947.16 3553.26 9.39 0.32 -9.39 5980307.21 586856.39 N 70.35605433 W 149.29462214 7928.76 87.99 116.47 4378.42 4457.12 1499.86 5614.67 1933.61 3580.42 1.29 -1.25 -0.30 5980293.96 586883.70 N 70.35601727 W 149.29440164 7959.52 88.20 116.29 4379.44 4458.14 1529.74 5645.42 1919.95 3607.96 0.90 0.68 -0.59 5980280.61 586911.39 N 70.35597992 W 149.29417805 7990.53 87.85 116.56 4380.51 4459.21 1559.86 5676.41 1906.16 3635.71 1.43 -1.13 0.87 5980267.13 586939.29 N 70.35594220 W 149.29395274 8020.99 87.31 117.62 4381.79 4460.49 1589.52 5706.84 1892.30 3662.81 3.90 -1.77 3.48 5980253.57 586966.53 N 70.35590431 W 149.29373279 8051.50 87.93 116.47 4383.06 4461.76 1619.23 5737.33 1878.44 3689.96 4.28 2.03 -3.77 5980240.02 586993.83 N 70.35586641 W 149.29351238 8082.17 88.20 118.70 4384.10 4462.80 1649.17 5767.98 1864.25 3717.12 7.32 0.88 7.27 5980226.13 587021.15 N 70.35582760 W 149.29329185 8112.99 87.96 120.34 4385.13 4463.83 1679.45 5798.78 1849.07 3743.92 5.37 -0.78 5.32 5980211.25 587048.12 N 70.35578610 W 149.29307426 8143.89 87.65 120.51 4386.31 4465.01 1709.90 5829.66 1833.43 3770.55 1.14 -1.00 0.55 5980195.91 587074.92 N 70.35574334 W 149.29285813 8173.86 87.00 122.75 4387.71 4466.41 1739.52 5859.59 1817.73 3796.04 7.77 -2.17 7.47 5980180.50 587100.58 N 70.35570042 W 149.29265123 8205.63 87.17 125.08 4389.33 4468.03 1771.06 5891.32 1800.03 3822.37 7.34 0.54 7.33 5980163.09 587127.10 N 70.35565202 W 149.29243751 8235.82 86.82 125.40 4390.91 4469.61 1801.11 5921.47 1782.64 3846.99 1.57 -1.16 1.06 5980145.97 587151.91 N 70.35560446 W 149.29223763 8266.75 86.65 126.22 4392.67 4471.37 1831.91 5952.35 1764.57 3872.03 2.70 -0.55 2.65 5980128.19 587177.15 N 70.35555507 W 149.29203437 8297.62 87.00 129.37 4394.38 4473.08 1862.70 5983.17 1745.68 3896.39 10.25 1.13 10.20 5980109.57 587201.71 N 70.35550344 W 149.29183670 8328.73 87.10 129.44 4395.98 4474.68 1893.77 6014.24 1725.96 3920.39 0.39 0.32 0.23 5980090.12 587225.93 N 70.35544952 W 149.29164185 8360.17 87.89 131.46 4397.36 4476.06 1925.18 6045.65 1705.58 3944.29 6.89 2.51 6.43 5980070.01 587250.05 N 70.35539382 W 149.29144787 8390.77 88.17 134.05 4398.41 4477.11 1955.72 6076.23 1684.82 3966.75 8.51 0.92 8.46 5980049.51 587272.73 N 70.35533708 W 149.29126564 8421.23 88.13 133.80 4399.39 4478.09 1986.09 6106.68 1663.70 3988.67 0.83 -0.13 -0.82 5980028.63 587294.89 N 70.35527935 W 149.29108768 8452.92 89.19 135.82 4400.13 4478.83 2017.66 6138.36 1641.38 4011.15 7.20 3.34 6.37 5980006.56 587317.61 N 70.35521832 W 149.29090529 8484.40 91.87 138.37 4399.84 4478.54 2048.89 6169.84 1618.32 4032.57 11.75 8.51 8.10 5979983.75 587339.29 N 70.35515531 W 149.29073141 8515.24 92.14 139.39 4398.76 4477.46 2079.34 6200.66 1595.11 4052.84 3.42 0.88 3.31 5979960.76 587359.82 N 70.35509185 W 149.29056693 8546.65 92.76 139.43 4397.42 4476.12 2110.30 6232.04 1571.28 4073.26 1.98 1.97 0.13 5979937.16 587380.50 N 70.35502672 W 149.29040125 8577.42 95.97 142.15 4395.08 4473.78 2140.43 6262.71 1547.51 4092.65 13.66 10.43 8.84 5979913.61 587400.15 N 70.35496176 W 149.29024389 8608.76 96.89 142.46 4391.57 4470.27 2170.86 6293.86 1522.87 4111.70 3.10 2.94 0.99 5979889.19 587419.46 N 70.35489441 W 149.29008938 8640.22 95.00 145.32 4388.31 4467.01 2201.23 6325.15 1497.59 4130.13 10.86 -6.01 9.09 5979864.12 587438.18 N 70.35482533 W 149.28993979 8671.29 93.62 145.93 4385.98 4464.68 2231.07 6356.13 1472.02 4147.62 4.85 -4.44 1.96 5979838.75 587455.95 N 70.35475545 W 149.28979788 8702.65 92.70 146.68 4384.25 4462.95 2261.12 6387.44 1445.97 4165.00 3.78 -2.93 2.39 5979812.89 587473.61 N 70.35468425 W 149.28965695 8734.17 91.70 148.49 4383.04 4461.74 2291.14 6418.94 1419.38 4181.88 6.56 -3.17 5.74 5979786.50 587490.78 N 70.35461159 W 149.28951999 8765.49 92.35 146.21 4381.93 4460.63 2321.02 6450.24 1393.03 4198.76 7.57 2.08 -7.28 5979760.34 587507.96 N 70.35453957 W 149.28938300 8796.85 95.28 143.87 4379.84 4458.54 2351.23 6481.52 1367.39 4216.69 11.95 9.34 -7.46 5979734.90 587526.17 N 70.35446950 W 149.28923758 8827.80 95.21 143.54 4377.01 4455.71 2381.17 6512.34 1342.55 4234.93 1.09 -0.23 -1.07 5979710.27 587544.69 N 70.35440161 W 149.28908956 8860.34 92.28 144.59 4374.89 4453.59 2412.67 6544.81 1316.26 4253.99 9.56 -9.00 3.23 5979684.19 587564.03 N 70.35432976 W 149.28893497 8891.06 91.15 148.72 4373.97 4452.67 2442.08 6575.52 1290.61 4270.86 13.93 -3.68 13.44 5979658.74 587581.18 N 70.35425968 W 149.28879808 8923.00 89.47 151.00 4373.80 4452.50 2472.12 6607.45 1263.00 4286.90 8.87 -5.26 7.14 5979631.30 587597.52 N 70.35418420 W 149.28866801 8953.54 87.58 152.89 4374.58 4453.28 2500.43 6637.98 1236.06 4301.25 8.75 -6.19 6.19 5979604.53 587612.18 N 70.35411058 W 149.28855156 8984.50 87.55 157.09 4375.90 4454.60 2528.46 6668.92 1208.03 4314.33 13.55 -0.10 13.57 5979576.65 587625.56 N 70.35403400 W 149.28844553 9016.10 88.78 158.90 4376.91 4455.61 2556.35 6700.50 1178.75 4326.16 6.92 3.89 5.73 5979547.51 587637.72 N 70.35395399 W 149.28834959 9046.88 87.48 162.73 4377.91 4456.61 2582.76 6731.26 1149.70 4336.27 13.13 -4.22 12.44 5979518.57 587648.15 N 70.35387461 W 149.28826766 9077.63 87.68 166.69 4379.21 4457.91 2608.01 6761.98 1120.07 4344.37 12.88 0.65 12.88 5979489.04 587656.58 N 70.35379365 W 149.28820203 9108.92 88.20 170.29 4380.34 4459.04 2632.48 6793.25 1089.43 4350.61 11.62 1.66 11.51 5979458.48 587663.16 N 70.35370995 W 149.28815153 9140.61 87.27 172.71 4381.59 4460.29 2656.20 6824.92 1058.12 4355.29 8.18 -2.93 7.64 5979427.22 587668.18 N 70.35362439 W 149.28811367 9171.73 86.17 177.05 4383.37 4462.07 2678.21 6855.99 1027.18 4358.06 14.36 -3.53 13.95 5979396.32 587671.30 N 70.35353987 W 149.28809131 9203.61 88.16 180.15 4384.95 4463.65 2699.26 6887.83 995.36 4358.84 11.54 6.24 9.72 5979364.51 587672.43 N 70.35345292 W 149.28808515 9234.10 90.33 182.00 4385.35 4464.05 2718.41 6918.31 964.88 4358.27 9.35 7.12 6.07 5979334.03 587672.20 N 70.35336966 W 149.28808994 9265.19 90.29 182.60 4385.18 4463.88 2737.43 6949.40 933.81 4357.02 1.93 -0.13 1.93 5979302.95 587671.30 N 70.35328480 W 149.28810021 9296.32 90.57 182.48 4384.95 4463.65 2756.36 6980.53 902.71 4355.64 0.98 0.90 -0.39 5979271.84 587670.26 N 70.35319984 W 149.28811156 9326.11 91.01 181.28 4384.54 4463.24 2774.75 7010.32 872.94 4354.66 4.29 1.48 -4.03 5979242.07 587669.62 N 70.35311851 W 149.28811964 9357.55 89.71 182.70 4384.34 4463.04 2794.11 7041.76 841.53 4353.57 6.12 -4.13 4.52 5979210.64 587668.87 N 70.35303268 W 149.28812865 9389.23 89.47 182.21 4384.57 4463.27 2813.41 7073.44 809.88 4352.21 1.72 -0.76 -1.55 5979178.98 587667.87 N 70.35294622 W 149.28813981 9421.98 89.88 182.34 4384.75 4463.45 2833.45 7106.19 777.15 4350.91 1.31 1.25 0.40 5979146.25 587666.93 N 70.35285682 W 149.28815052 9452.68 89.47 184.35 4384.93 4463.63 2851.77 7136.88 746.51 4349.12 6.68 -1.34 6.55 5979115.59 587665.48 N 70.35277311 W 149.28816521 9483.53 90.63 183.01 4384.90 4463.60 2870.05 7167.73 715.72 4347.14 5.74 3.76 -4.34 5979084.78 587663.85 N 70.35268901 W 149.28818143 9515.45 94.48 183.68 4383.48 4462.18 2889.08 7199.62 683.89 4345.28 12.24 12.06 2.10 5979052.94 587662.34 N 70.35260206 W 149.28819668 9545.57 97.27 185.48 4380.40 4459.10 2906.44 7229.58 654.03 4342.89 11.01 9.26 5.98 5979023.06 587660.28 N 70.35252048 W 149.28821623 9576.71 96.82 185.55 4376.58 4455.28 2923.94 7260.48 623.27 4339.92 1.46 -1.45 0.22 5978992.27 587657.65 N 70.35243645 W 149.28824049 9607.62 97.41 185.76 4372.75 4451.45 2941.25 7291.15 592.75 4336.90 2.02 1.91 0.68 5978961.72 587654.97 N 70.35235307 W 149.28826517 9639.43 97.69 185.01 4368.57 4447.27 2959.16 7322.69 561.35 4333.94 2.50 0.88 -2.36 5978930.29 587652.36 N 70.35226731 W 149.28828935 9669.37 97.17 185.92 4364.70 4443.40 2975.99 7352.37 531.80 4331.11 3.48 -1.74 3.04 5978900.71 587649.86 N 70.35218657 W 149.28831244 9701.64 97.76 183.22 4360.50 4439.20 2994.54 7384.37 499.91 4328.56 8.50 1.83 -8.37 5978868.80 587647.67 N 70.35209945 W 149.28833329 9732.38 96.20 184.73 4356.77 4435.47 3012.48 7414.88 469.47 4326.45 7.04 -5.07 4.91 5978838.34 587645.89 N 70.35201631 W 149.28835061 9762.92 95.65 184.87 4353.62 4432.32 3029.99 7445.26 439.20 4323.90 1.86 -1.80 0.46 5978808.05 587643.69 N 70.35193362 W 149.28837139 9809.89 96.16 183.39 4348.78 4427.48 3057.36 7491.98 392.60 4320.54 3.32 1.09 -3.15 5978761.42 587640.84 N 70.35180632 W 149.28839893 9860.00 96.16 183.39 4343.41 4422.11 3087.08 7541.80 342.87 4317.59 0.00 0.00 0.00 5978711.66 587638.45 N 70.35167046 W 149.28842308 Leaal Description: Northina fY} rftUSl Eastina (X) rftUSl Surface: 2597 FSL 3588 FEL S34 T12N R11 E UM 5978320.84 583325.34 BHL: 2939 FSL 4550 FEL S35 T12N R11E UM 5978711.66 587638.45 SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31 rt-546 ) N-U\L-201\L-201 L3\L-201 L3 Generated 5/5/2004 2:00 PM Page 3 of 3 ) ) bp 0 L-201 L3PB1 S R rtSChlumberger urvey epo Report Date: 25-Apr-04 Survey / DLS Computation Method: Minimum Curvature 1 Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 130.000· Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure / Slot: L-PAD 1 N-U TVD Reference Datum: Rotary Table Well: L-201 TVD Reference Elevation: 78.70 ft relative to MSL Borehole: L-201L3PB1 Sea Bed / Ground Level Elevation: 50.20 ft relative to MSL UWIfAPI#: 500292320273 Magnetic Declination: 24.980· Survey Name / Date: L-201 L3PB11 April 25, 2004 Total Field strength: 57562.697 nT Tort / AHD / DDI / ERD ratio: 323.415· 17057.33 ftl 6.679 1 1.574 Magnetic Dip: 80.824· Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 29, 2004 Location LatfLong: N 70.35073717, W 149.32347531 Magnetic Declination Model: BGGM 2003 Location Grid N/E Y/X: N 5978320.840 ftUS, E 583325.340 ftUS North Reference: True North Grid Convergence Angle: -+0.63713312· Total Corr Mag North -> True North: +24.980· Grid Scale Factor: 0.99990789 Local Coordinates Referenced To: Well Head Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft) (ft ) (ft ) (ft ) (ft ) (deg/100 ft) ( deg/100 ft ) ( deg/1 00 ft ) (ftUS) (ftUS) 0.00 0.00 0.00 -78.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5978320.84 583325.34 N 70.35073717 W 149.32347531 124.00 0.22 237.38 45.30 124.00 -0.07 0.24 -0.13 -0.20 0.18 0.18 0.00 5978320.71 583325.14 N 70.35073682 W 149.32347694 224.00 0.52 340.14 145.30 224.00 -0.52 0.75 0.19 -0.52 0.61 0.30 102.76 5978321.03 583324.82 N 70.35073770 W 149.32347951 324.00 2.13 19.40 245.27 323.97 -1.57 3.00 2.37 -0.05 1.76 1.61 39.26 5978323.21 583325.26 N 70.35074366 W 149.32347575 395.00 4.15 21.01 316.16 394.86 -2.87 6.89 6.02 1.31 2.85 2.85 2.27 5978326.87 583326.58 N 70.35075361 W 149.32346471 495.00 5.88 17.19 415.77 494.47 -6.03 15.63 14.29 4.12 1.76 1.73 -3.82 5978335.17 583329.30 N 70.35077621 W 149.32344189 595.00 8.86 11.46 514.94 593.64 -11.70 28.45 26.73 7.16 3.07 2.98 -5.73 5978347.65 583332.20 N 70.35081020 W 149.32341717 695.00 11.87 12.48 613.29 691.99 -20.13 46.44 44.33 10.92 3.02 3.01 1.02 5978365.28 583335.76 N 70.35085827 W 149.32338670 758.99 14.48 14.62 675.59 754.29 -26.60 61.02 58.50 14.36 4.15 4.08 3.34 5978379.49 583339.05 N 70.35089697 W 149.32335876 853.05 17.37 16.52 766.04 844.74 -37.24 86.82 83.34 21.32 3.12 3.07 2.02 5978404.41 583345.73 N 70.35096485 W 149.32330224 947.46 19.62 16.37 855.56 934.26 -49.21 116.77 112.06 29.80 2.38 2.38 -0.16 5978433.22 583353.88 N 70.35104332 W 149.32323343 1040.82 22.84 16.89 942.58 1021.28 -62.61 150.57 144.45 39.48 3.45 3.45 0.56 5978465.71 583363.21 N 70.35113179 W 149.32315481 1132.91 25.75 16.87 1026.50 1105.20 -77.48 188.45 180.70 50.48 3.16 3.16 -0.02 5978502.07 583373.80 N 70.35123083 W 149.32306550 1226.13 27.99 17.46 1109.65 1188.35 -93.82 230.58 220.95 62.92 2.42 2.40 0.63 5978542.46 583385.79 N 70.35134079 W 149.32296450 1321.50 29.42 18.07 1193.30 1272.00 -111.15 276.39 264.57 76.90 1.53 1.50 0.64 5978586.22 583399.29 N 70.35145995 W 149.32285099 1416.81 31.11 18.21 1275.62 1354.32 -129.04 324.42 310.22 91.86 1.77 1.77 0.15 5978632.03 583413.74 N 70.35158465 W 149.32272956 1511.08 32.79 18.97 1355.60 1434.30 -147.24 374.31 357.49 107.77 1.83 1.78 0.81 5978679.48 583429.12 N 70.35171381 W 149.32260040 1604.81 34.13 19.21 1433.80 1512.50 -165.68 425.98 406.33 124.67 1.44 1.43 0.26 5978728.49 583445.47 N 70.35184722 W 149.32246316 1699.54 33.73 19.32 1512.40 1591.10 -184.40 478.86 456.24 142.12 0.43 -0.42 0.12 5978778.59 583462.36 N 70.35198358 W 149.32232152 1797.56 36.27 18.62 1592.68 1671.38 -204.58 535.08 509.41 160.38 2.62 2.59 -0.71 5978831.96 583480.03 N 70.35212883 W 149.32217323 1892.80 37.18 18.91 1669.02 1747.72 -225.21 592.03 563.33 178.70 0.97 0.96 0.30 5978886.07 583497.75 N 70.35227614 W 149.32202448 1988.07 39.87 19.15 1743.55 1822.25 -246.44 651.36 619.42 198.05 2.83 2.82 0.25 5978942.37 583516.48 N 70.35242937 W 149.32186737 2081.93 41.57 20.11 1814.68 1893.38 -267.74 712.59 677.09 218.63 1.93 1.81 1.02 5979000.26 583536.41 N 70.35258691 W 149.32170029 2175.78 42.75 19.75 1884.25 1962.95 -289.36 775.58 736.31 240.10 1.28 1.26 -0.38 5979059.70 583557.22 N 70.35274869 W 149.32152597 2269.96 45.03 20.88 1952.12 2030.82 -311.34 840.87 797.53 262.78 2.56 2.42 1.20 5979121.17 583579.21 N 70.35291593 W 149.32134182 2361.74 45.50 21.16 2016.71 2095.41 -332.55 906.07 858.39 286.17 0.56 0.51 0.31 5979182.28 583601.92 N 70.35308219 W 149.32115193 2458.33 47.95 21.23 2082.92 2161.62 -355.21 976.38 923.95 311.59 2.54 2.54 0.07 5979248.11 583626.61 N 70.35326130 W 149.32094549 2552.24 48.94 21.51 2145.22 2223.92 -377.66 1046.66 989.39 337.20 1.08 1.05 0.30 5979313.83 583651.48 N 70.35344008 W 149.32073755 2645.64 49.74 21.45 2206.07 2284.77 -400.17 1117.51 1055.32 363.14 0.86 0.86 -0.06 5979380.04 583676.69 N 70.35362019 W 149.32052688 2740.10 50.69 21.63 2266.52 2345.22 -423.15 1190.10 1122.84 389.79 1.02 1.01 0.19 5979447.84 583702.59 N 70.35380464 W 149.32031046 2834.26 50.10 21.09 2326.54 2405.24 -446.34 1262.64 1190.40 416.22 0.77 -0.63 -0.57 5979515.68 583728.26 N 70.35398921 W 149.32009588 2928.38 49.29 22.08 2387.43 2466.13 -469.01 1334.42 1257.15 442.62 1.18 -0.86 1.05 5979582.71 583753.91 N 70.35417154 W 149.31988149 3022.90 49.04 23.22 2449.23 2527.93 -490.34 1405.93 1323.14 470.16 0.95 -0.26 1.21 5979649.00 583780.71 N 70.35435183 W 149.31965786 3117.47 48.89 23.30 2511.32 2590.02 -510.89 1477.27 1388.68 498.33 0.17 -0.16 0.08 5979714.84 583808.15 N 70.35453086 W 149.31942910 3152.16 49.11 23.20 2534.08 2612.78 -518.43 1503.45 1412.73 508.66 0.67 0.63 -0.29 5979739.01 583818.21 N 70.35459658 W 149.31934517 3266.50 47.43 25.10 2610.19 2688.89 -541.75 1588.77 1490.59 543.55 1.92 -1.47 1.66 5979817.25 583852.23 N 70.35480928 W 149.31906183 3325.61 49.36 23.06 2649.43 2728.13 -553.88 1632.97 1530.95 561.57 4.16 3.27 -3.45 5979857.79 583869.80 N 70.35491951 W 149.31891549 3420.36 50.09 23.79 2710.69 2789.39 -574.50 1705.25 1597.27 590.31 0.97 0.77 0.77 5979924.43 583897.80 N 70.35510071 W 149.31868208 3515.35 49.54 23.70 2771.98 2850.68 -594.82 1777. 82 1663.70 619.53 0.58 -0.58 -0.09 5979991.17 583926.28 N 70.35528217 W 149.31844476 3609.16 49.34 23.32 2832.98 2911.68 -615.05 1849.09 1729.05 647.96 0.37 -0.21 -0.41 5980056.83 583953.98 N 70.35546071 W 149.31821387 3701.35 50.03 21.52 2892.63 2971.33 -636.28 1919.38 1794.03 674.77 1.67 0.75 -1.95 5980122.09 583980.05 N 70.35563821 W 149.31799618 3794.96 50.31 21.39 2952.59 3031.29 -659.14 1991.27 1860.94 701.06 0.32 0.30 -0.14 5980189.28 584005.60 N 70.35582099 W 149.31778262 3888.81 50.23 21.33 3012.57 3091.27 -682.21 2063.45 1928.16 727.35 0.10 -0.09 -0.06 5980256.78 584031.14 N 70.35600462 W 149.31756910 3982.46 49.83 20.65 3072.73 3151.43 -705.59 2135.22 1995.16 753.06 0.70 -0.43 -0.73 5980324.07 584056.10 N 70.35618767 W 149.31736028 4076.83 49.57 20.57 3133.77 3212.47 -729.49 2207.19 2062.53 778.39 0.28 -0.28 -0.08 5980391.70 584080.68 N 70.35637170 W 149.31715449 4172.21 49.68 19.90 3195.56 3274.26 -754.06 2279.86 2130.71 803.52 0.55 0.12 -0.70 5980460.15 584105.05 N 70.35655795 W 149.31695036 4266.06 48.39 21.00 3257.08 3335.78 -777.78 2350.72 2197.11 828.28 1.63 -1.37 1.17 5980526.82 584129.06 N 70.35673934 W 149.31674930 4360.01 47.90 21.14 3319.77 3398.47 -800.48 2420.70 2262.41 853.43 0.53 -0.52 0.15 5980592.38 584153.49 N 70.35691772 W 149.31654495 4454.28 47.80 22.75 3383.03 3461.73 -822.14 2490.59 2327.23 879.55 1.27 -0.11 1.71 5980657.49 584178.88 N 70.35709480 W 149.31633280 4548.11 48.18 26.94 3445.85 3524.55 -840.35 2560.29 2390.47 908.84 3.34 0.40 4.47 5980721.04 584207.46 N 70.35726755 W 149.31609491 4641.89 48.96 31.87 3507.92 3586.62 -853.25 2630.58 2451.68 943.36 4.03 0.83 5.26 5980782.62 584241.29 N 70.35743475 W 149.31581454 4735.40 48.79 36.31 3569.44 3648.14 -860.51 2701.01 2509.98 982.82 3.58 -0.18 4.75 5980841.36 584280.10 N 70.35759404 W 149.31549403 4829.57 48.97 40.88 3631.39 3710.09 -862.24 2771.93 2565.40 1027.05 3.66 0.19 4.85 5980897.26 584323.71 N 70.35774541 W 149.31513475 4923.41 48.83 47.15 3693.11 3771.81 -857.30 2842.62 2616.21 1076.14 5.04 -0.15 6.68 5980948.61 584372.22 N 70.35788420 W 149.31473606 SurveyEditor Ver 3.1 RT -SP3.03-HF4.00 Bld( d031 rt-546 ) N-U\L-201 \L-201 L3PB 1 \L-201 L3PB 1 Generated 5/5/2004 1 :36 PM Page 1 of 3 ) ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft) (ft ) (ft ) ( deg/100 ft ) ( deg/100 ft ) ( deg/1 00 ft ) (ftUS) (ftUS) 5016.44 49.09 54.19 3754.24 3832.94 -844.31 2912.75 2660.62 1130.36 5.71 0,28 7.57 5980993.62 584425.94 N 70.35800551 W 149.31429571 5110.60 48.23 58.33 3816.45 3895.15 -824.54 2983.43 2699.89 1189.11 3.42 -0.91 4.40 5981033.53 584484.25 N 70.35811275 W 149.31381851 5204.87 49.16 62.86 3878.69 3957.39 -799.63 3054.23 2734.62 1250.78 3.74 0.99 4.81 5981068.94 584545.52 N 70.35820761 W 149.31331763 5298.92 47.75 68.46 3941.09 4019.79 -769.20 3124.59 2763.65 1314.85 4.70 -1.50 5.95 5981098.67 584609.26 N 70.35828687 W 149.31279728 5392.93 49.39 73.49 4003.32 4082.02 -732.92 3195.05 2786.57 1381.46 4.37 1.74 5.35 5981122.34 584675.60 N 70.35834947 W 149.31225633 5487.16 51.11 80.03 4063.61 4142.31 -689.56 3267.47 2803.10 1451.92 5.64 1.83 6.94 5981139.64 584745.86 N 70.35839458 W 149.31168408 5582.88 53.94 84.88 4121.86 4200.56 -638.27 3343.41 2813.00 1527.19 4.99 2.96 5.07 5981150.39 584821.01 N 70.35842161 W 149.31107280 5677.97 56.15 89.22 4176.36 4255.06 -581.23 3421.33 2816.97 1604.99 4.40 2.32 4.56 5981155.22 584898.75 N 70.35843241 W 149.31044097 5769.98 58.26 91.53 4226.20 4304.90 -521.65 3498.66 2816.45 1682.32 3.12 2.29 2.51 5981155.56 584976.08 N 70.35843093 W 149.30981296 5862.16 59.02 94.81 4274.18 4352.88 -458.65 3577.37 2812.09 1760.89 3.15 0.82 3.56 5981152.07 585054.69 N 70.35841896 W 149.30917484 5955.46 61.37 98.97 4320.56 4399.26 -390.85 3658.32 2802.35 1841.23 4.62 2.52 4.46 5981143.22 585135.12 N 70.35839229 W 149.30852243 6025.00 63.75 101.66 4352.61 4431.31 -337.24 3720.02 2791.28 1901.93 4.85 3.42 3.87 5981132.83 585195.94 N 70.35836203 W 149.30802947 6037.00 65.61 102.17 4357.74 4436.44 -327.67 3730.87 2789.04 1912.55 15.97 15.50 4.25 5981130.71 585206.58 N 70.35835590 W 149.30794329 6067.17 69.45 102.59 4369.27 4447.97 -302.97 3758.75 2783.06 1939.77 12.79 12.73 1.39 5981125.04 585233.87 N 70.35833955 W 149.30772220 6098.49 73.46 103.02 4379.23 4457.93 -276.56 3788.43 2776.48 1968.72 12.87 12.80 1.37 5981118.78 585262.88 N 70.35832155 W 149.30748711 6129.29 77.29 1 03.45 4387.01 4465.71 -249.96 3818.23 2769.66 1997.73 12.51 12.44 1.40 5981112.28 585291.96 N 70.35830289 W 149.30725157 6160.61 80.90 103.88 4392.93 4471.63 -222.40 3848.98 2762.40 2027.60 11.60 11.53 1.37 5981105.35 585321.91 N 70.35828302 W 149.30700894 6191.13 83.52 104.30 4397.07 4475.77 -195.20 3879.21 2755.03 2056.93 8.69 8.58 1.38 5981098.32 585351.32 N 70.35826289 W 149.30677080 6223.02 83.49 104.20 4400.67 4479.37 -166.66 3910.90 2747.24 2087.64 0.33 -0.09 -0.31 5981090.86 585382.11 N 70.35824156 W 149.30652142 6254.04 85.41 106.75 4403.68 4482.38 -138.58 3941.77 2739.00 2117.39 10.26 6.19 8.22 5981082.95 585411.95 N 70.35821903 W 149.30627983 6284.62 89.47 108.79 4405.04 4483.74 -110.31 3972.32 2729.68 2146.48 14.85 13.28 6.67 5981073.96 585441.13 N 70.35819354 W 149.30604365 6315.35 93.21 111.40 4404.32 4483.02 -81.43 4003.03 2719.12 2175.32 14.84 12.17 8.49 5981063.73 585470.09 N 70.35816469 W 149.30580943 6347.35 95.13 111.33 4402.00 4480.70 -51.19 4034.95 2707.50 2205.04 6.00 6.00 -0.22 5981052.43 585499.93 N 70.35813291 W 149.30556810 6378.38 95.10 112.78 4399.23 4477.93 -21.78 4065.85 2695.89 2233.68 4.66 -0.10 4.67 5981041.15 585528.70 N 70.35810118 W 149.30533551 6409.80 95.11 113.80 4396.43 4475.13 8.19 4097.15 2683.52 2262.43 3.23 0.03 3.25 5981029.10 585557.58 N 70.35806735 W 149.30510210 6441 .44 95.58 115.26 4393.49 4472.19 38.55 4128.65 2670.44 2291.09 4.83 1.49 4.61 5981016.34 585586.38 N 70.35803160 W 149.30486940 6472.14 94.42 115.42 4390.81 4469.51 68.14 4159.23 2657.35 2318.73 3.81 -3.78 0.52 5981003.56 585614.16 N 70.35799582 W 149.30464497 6503.35 95.03 116.94 4388.24 4466.94 98.34 4190.34 2643.63 2346.64 5.23 1.95 4.87 5980990.15 585642.22 N 70.35795831 W 149.30441833 6534.97 95.27 120.06 4385.40 4464.10 129.20 4221.83 2628.60 2374.31 9.86 0.76 9.87 5980975.43 585670.06 N 70.35791724 W 149.30419364 6565.63 95.17 121.20 4382.61 4461.31 159.32 4252.36 2613.05 2400.58 3.72 -0.33 3.72 5980960.17 585696.50 N 70.35787472 W 149.30398033 6597.06 95.27 122.26 4379.75 4458.45 190.29 4283.66 2596.59 2427.21 3.37 0.32 3.37 5980944.01 585723.30 N 70.35782973 W 149.30376418 6627.98 95.24 122.20 4376.92 4455.62 220.80 4314.45 2580.17 2453.25 0.22 -0.10 -0.19 5980927.88 585749.52 N 70.35778484 W 149.30355271 6658.52 94.72 120.34 4374.27 4452.97 250.87 4344.88 2564.37 2479.26 6.30 -1.70 -6.09 5980912.38 585775.70 N 70.35774168 W 149.30334158 6689.96 92.73 117.86 4372.22 4450.92 281.68 4376.25 2549.12 2506.67 10.10 -6.33 -7.89 5980897.43 585803.27 N 70.35769998 W 149.30311902 6722.28 92.11 118.28 4370.86 4449.56 313.27 4408.54 2533.92 2535.16 2.32 -1.92 1.30 5980882.56 585831.93 N 70.35765844 W 149.30288768 6753.12 92.49 119.35 4369.62 4448.32 343.50 4439.35 2519.07 2562.16 3.68 1.23 3.47 5980868.01 585859.09 N 70.35761784 W 149.30266847 6784.35 92.52 119.42 4368.26 4446.96 374.16 4470.55 2503.76 2589.34 0.24 0.10 0.22 5980853.00 585886.44 N 70.35757599 W 149.30244774 6816.02 92.73 119.54 4366.81 4445.51 405.27 4502.19 2488.19 2616.88 0.76 0.66 0.38 5980837.74 585914.15 N 70.35753343 W 149.30222413 6846.65 92.38 118.96 4365.44 4444.14 435.33 4532.79 2473.24 2643.58 2.21 -1.14 -1.89 5980823.09 585941,01 N 70.35749256 W 149.30200736 6877.53 90.50 121.42 4364.67 4443.37 465.75 4563.66 2457.72 2670.26 10.02 -6.09 7.97 5980807.87 585967.86 N 70.35745013 W 149.30179075 6909.80 90.26 121.06 4364.45 4443.15 497.64 4595.93 2440.99 2697.85 1.34 -0.74 -1.12 5980791.44 585995.63 N 70.35740438 W 149.30156674 6940.05 90.57 118.38 4364.23 4442.93 527.40 4626.18 2425.99 2724.12 8.92 1.02 -8.86 5980776.74 586022.06 N 70.35736339 W 149.30135348 6971.84 90.02 120.46 4364.07 4442.77 558.65 4657.97 2410.38 2751.81 6.77 -1.73 6.54 5980761.44 586049.92 N 70.35732071 W 149.30112867 7002.09 91.29 119.49 4363.72 4442.42 588.43 4688.21 2395.26 2778.01 5.28 4.20 -3.21 5980746.62 586076.28 N 70.35727940 W 149.30091594 7032.71 89.74 120.63 4363.45 4442.15 618.59 4718.83 2379.93 2804.51 6.28 -5.06 3.72 5980731.58 586102.95 N 70.35723747 W 149.30070080 7064.12 89.37 119.22 4363.69 4442.39 649.51 4750.24 2364.26 2831.73 4.64 -1.18 -4.49 5980716.22 586130.34 N 70.35719464 W 149.30047979 7095.24 89.43 119.61 4364.02 4442.72 680.10 4781.36 2348.98 2858,84 1.27 0.19 1.25 5980701.24 586157.61 N 70.35715286 W 149.30025972 7127.33 90.09 120.48 4364.15 4442.85 711.71 4813.45 2332.91 2886.61 3.40 2.06 2.71 5980685.48 586185.56 N 70.35710894 W 149.30003420 7156.37 90.46 120.75 4364.01 4442.71 740.36 4842.49 2318.12 2911.61 1.58 1.27 0.93 5980670.97 586210.72 N 70.35706851 W 149.29983129 7188.49 89.06 122.08 4364.15 4442.85 772.12 4874.61 2301.38 2939.02 6.01 -4.36 4.14 5980654.54 586238.31 N 70.35702274 W 149.29960876 7219.01 88.78 121.55 4364.72 4443.42 802.32 4905.12 2285.29 2964.95 1.96 -0.92 -1.74 5980638.74 586264.41 N 70.35697877 W 149.29939825 7250.14 89.06 122.40 4365.31 4444.01 833.14 4936.25 2268.81 2991.35 2.87 0.90 2.73 5980622.56 586290.99 N 70.35693371 W 149.29918390 7282.07 88.75 121.85 4365.92 4444.62 864.76 4968.17 2251.83 3018.38 1.98 -0.97 -1.72 5980605.88 586318.22 N 70.35688731 W 149.29896441 7312.23 88.54 124.48 4366.63 4445.33 894.70 4998.32 2235.34 3043.62 8.75 -0.70 8.72 5980589.67 586343.63 N 70.35684222 W 149.29875952 7343.68 88.72 121.62 4367.38 4446.08 925.91 5029.76 2218.20 3069.97 9.11 0.57 -9.09 5980572.82 586370.17 N 70.35679535 W 149.29854559 7373.72 88.75 123.81 4368.05 4446.75 955.69 5059.80 2201.97 3095.24 7.29 0.10 7.29 5980556.88 586395.61 N 70.35675098 W 149.29834047 7405.43 90.40 121.45 4368.28 4446.98 987.14 5091.50 2184.87 3121.94 9.08 5.20 -7.44 5980540.08 586422.50 N 70.35670425 W 149.29812369 7436.75 90.53 123.10 4368.03 4446.73 1018.17 5122.82 2168.15 3148.42 5.28 0.42 5.27 5980523.66 586449.16 N 70.35665853 W 149.29790873 7468.41 90.57 121.71 4367.72 4446.42 1049.55 5154.48 2151.18 3175.15 4.39 0.13 -4.39 5980506.99 586476.07 N 70.35661215 W 149.29769174 7499.57 89.95 122.55 4367.58 4446.28 1080.42 5185.64 2134.61 3201.54 3.35 -1.99 2.70 5980490.71 586502.64 N 70.35656685 W 149.29747753 7531.47 89.54 119.47 4367.73 4446.43 1111.92 5217.54 2118.18 3228.87 9.74 -1.29 -9.66 5980474.59 586530.16 N 70.35652193 W 149.29725560 7561.83 88.89 118.27 4368.14 4446.84 1141.71 5247.90 2103.52 3255.46 4.49 -2.14 -3.95 5980460.23 586556.90 N 70.35648185 W 149.29703978 7590.92 88.61 119.15 4368.78 4447.48 1170.23 5276.98 2089.55 3280.96 3.17 -0.96 3.03 5980446.54 586582.56 N 70.35644366 W 149.29683270 7623.38 88.58 118.53 4369.57 4448.27 1202.06 5309.43 2073.90 3309.39 1.91 -0.09 -1.91 5980431.21 586611.15 N 70.35640086 W 149.29660193 7652.38 89.02 116.24 4370.18 4448.88 1230.36 5338.42 2060.56 3335.13 8.04 1.52 -7.90 5980418.16 586637.04 N 70.35636440 W 149.29639294 7683.48 89.09 116,61 4370.69 4449.39 1260.58 5369.52 2046.72 3362.98 1.21 0.23 1.19 5980404.64 586665.04 N 70.35632656 W 149.29616687 7714.85 88.47 116.22 4371.36 4450.06 1291.07 5400.88 2032.77 3391.07 2.33 -1.98 -1.24 5980391.00 586693.28 N 70.35628841 W 149.29593883 7745.61 88.44 116.39 4372.19 4450.89 1320.94 5431.63 2019.14 3418.63 0.56 -0.10 0.55 5980377.68 586720.99 N 70.35625115 W 149.29571505 7774.09 87.68 116.91 4373.15 4451.85 1348.64 5460.10 2006.38 3444.07 3.23 -2.67 1.83 5980365.20 586746.56 N 70.35621624 W 149.29550852 7806.71 87.58 118.22 4374.50 4453.20 1380.46 5492.69 1991.30 3472.96 4.02 -0.31 4.02 5980350.44 586775.62 N 70.35617500 W 149.29527397 7837.79 88.23 119.57 4375.64 4454.34 1410.94 5523.75 1976.29 3500.15 4.82 2.09 4.34 5980335.74 586802.97 N 70.35613397 W 149.29505322 SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) N-U\L-201\L-201 L3PB1\L-201 L3PB1 Generated 5/5/2004 1 :36 PM Page 2 of 3 ) ) Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole NS EW DLS Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft) (ft ) (ft) ( deg/1 00 ft ) (deg/100 ft) (deg/100 ft) (ftUS) (!tUS) 7867.60 88.27 119.45 4376.55 4455.25 1440.24 5553.54 1961.61 3526.08 0.42 0.13 -0.40 5980321.35 586829.06 N 70.35609384 W 149.29484271 7898.39 88.37 116.56 4377.45 4456.15 1470.34 5584.32 1947.16 3553.26 9.39 0.32 -9.39 5980307.21 586856.39 N 70.35605433 W 149.29462214 7928.76 87.99 116.47 4378.42 4457.12 1499.86 5614.67 1933.61 3580.42 1.29 -1.25 -0.30 5980293.96 586883.70 N 70.35601727 W 149.29440164 7959.52 88.20 116.29 4379.44 4458.14 1529.74 5645.42 1919.95 3607.96 0.90 0.68 -0.59 5980280.61 586911.39 N 70.35597992 W 149.29417805 7990.53 87.85 116.56 4380.51 4459.21 1559.86 5676.41 1906.16 3635.71 1.43 -1.13 0.87 5980267.13 586939.29 N 70.35594220 W 149.29395274 8020.99 87.31 117.62 4381.79 4460.49 1589.52 5706.84 1892.30 3662.81 3.90 -1.77 3.48 5980253.57 586966.53 N 70.35590431 W 149.29373279 8051.50 87.93 116.47 4383.06 4461.76 1619.23 5737.33 1878.44 3689.96 4.28 2.03 -3.77 5980240.02 586993.83 N 70.35586641 W 149.29351238 8082.17 88.20 118.70 4384.10 4462.80 1649.17 5767.98 1864.25 3717.12 7.32 0.88 7.27 5980226.13 587021.15 N 70.35582760 W 149.29329185 8112.99 87.96 120.34 4385.13 4463.83 1679.45 5798.78 1849.07 3743.92 5.37 -0.78 5.32 5980211.25 587048.12 N 70.35578610 W 149.29307426 8143.89 87.65 120.51 4386.31 4465.01 1709.90 5829.66 1833.43 3770.55 1.14 -1.00 0.55 5980195.91 587074.92 N 70.35574334 W 149.29285813 8173.86 87.00 122.75 4387.71 4466.41 1739.52 5859.59 1817.73 3796.04 7.77 -2.17 7.47 5980180.50 587100.58 N 70.35570042 W 149.29265123 8205.63 87.17 125.08 4389.33 4468.03 1771.06 5891.32 1800.03 3822.37 7.34 0.54 7.33 5980163.09 587127.10 N 70.35565202 W 149.29243751 8235.82 86.82 125.40 4390.91 4469.61 1801.11 5921.47 1782.64 3846.99 1.57 -1.16 1.06 5980145.97 587151.91 N 70.35560446 W 149.29223763 8266.75 86.65 126.22 4392.67 4471.37 1831.91 5952.35 1764.57 3872.03 2.70 -0.55 2.65 5980128.19 587177.15 N 70.35555507 W 149.29203437 8297.62 87.00 129.37 4394.38 4473.08 1862.70 5983.17 1745.68 3896.39 10.25 1.13 10.20 5980109.57 587201.71 N 70.35550344 W 149.29183670 8328.73 87.10 129.44 4395.98 4474.68 1893.77 6014.24 1725.96 3920.39 0.39 0.32 0.23 5980090.12 587225.93 N 70.35544952 W 149.29164185 8360.17 87.89 131.46 4397.36 4476.06 1925.18 6045.65 1705.58 3944.29 6.89 2.51 6.43 5980070.01 587250.05 N 70.35539382 W 149.29144787 8390.77 88.17 134.05 4398.41 4477.11 1955.72 6076.23 1684.82 3966.75 8.51 0.92 8.46 5980049.51 587272.73 N 70.35533708 W 149.29126564 8421.23 88.13 133.80 4399.39 4478.09 1986.09 6106.68 1663.70 3988.67 0.83 -0.13 -0.82 5980028.63 587294.89 N 70.35527935 W 149.29108768 8452.92 89.19 135.82 4400.13 4478.83 2017.66 6138.36 1641.38 4011.15 7.20 3.34 6.37 5980006.56 587317.61 N 70.35521832 W 149.29090529 8484.40 91.87 138.37 4399.84 4478.54 2048.89 6169.84 1618.32 4032.57 11.75 8.51 8.10 5979983.75 587339.29 N 70.35515531 W 149.29073141 8515.24 92.14 139.39 4398.76 4477.46 2079.34 6200.66 1595.11 4052.84 3.42 0.88 3.31 5979960.76 587359.82 N 70.35509185 W 149.29056693 8546.65 92.76 139.43 4397.42 4476.12 2110.30 6232.04 1571.28 4073.26 1.98 1.97 0.13 5979937.16 587380.50 N 70.35502672 W 149.29040125 8577.42 95.97 142.15 4395.08 4473.78 2140.43 6262.71 1547.51 4092.65 13.66 10.43 8.84 5979913.61 587400.15 N 70.35496176 W 149.29024389 8608.76 96.89 142.46 4391.57 4470.27 2170.86 6293.86 1522.87 4111.70 3.10 2.94 0.99 5979889.19 587419.46 N 70.35489441 W 149.29008938 8640.22 95.00 145.32 4388.31 4467.01 2201.23 6325.15 1497.59 4130.13 10.86 -6.01 9.09 5979864.12 587438.18 N 70.35482533 W 149.28993979 8671.29 93.62 145.93 4385.98 4464.68 2231.07 6356.13 1472.02 4147.62 4.85 -4.44 1.96 5979838.75 587455.95 N 70.35475545 W 149.28979788 8702.65 92.70 146.68 4384.25 4462.95 2261.12 6387.44 1445.97 4165.00 3.78 -2.93 2.39 5979812.89 587473.61 N 70.35468425 W 149.28965695 8734.01 93.31 148.37 4382.60 4461.30 2290.98 6418.76 1419.55 4181.81 5.72 1.95 5.39 5979786.67 587490.71 N 70.35461206 W 149.28952054 8765.12 95.45 151.83 4380.23 4458.93 2320.11 6449.77 1392.67 4197.27 13.05 6.88 11.12 5979759.96 587506.47 N 70.35453859 W 149.28939513 8796.21 96.76 154.07 4376.92 4455.62 2348.57 6480.69 1365.14 4211.33 8.31 4.21 7.20 5979732.59 587520.83 N 70.35446336 W 149.28928111 8827.99 96.93 157.87 4373.13 4451.83 2376.93 6512.24 1336.32 4224.18 11.88 0.53 11.96 5979703.92 587534.00 N 70.35438462 W 149.28917693 8860.31 96.96 160.73 4369.22 4447.92 2404.91 6544.32 1306.31 4235.51 8.78 0.09 8.85 5979674.05 587545.67 N 70.35430263 W 149.28908500 8890.83 96.41 163.65 4365.67 4444.37 2430.56 6574.63 1277.46 4244.78 9.67 -1.80 9.57 5979645.30 587555.26 N 70.35422378 W 149.28900987 8922.36 95.59 165.07 4362.37 4441.07 2456.44 6605.99 1247.26 4253.24 5.18 -2.60 4.50 5979615.20 587564.05 N 70.35414127 W 149.28894137 8954.40 94.93 168.79 4359.43 4438.13 2481.94 6637.90 1216.19 4260.45 11.74 -2.06 11.61 5979584.21 587571.60 N 70.35405637 W 149.28888295 8983.77 94.65 173.09 4356.98 4435.68 2504.05 6667.16 1187.29 4265.06 14.62 -0.95 14.64 5979555.37 587576.53 N 70.35397743 W 149.28884567 9014.46 94.03 17 4.23 4354.66 4433.36 2526.18 6697.77 1156.88 4268.44 4.22 -2.02 3.71 5979525.00 587580.25 N 70.35389433 W 149.28881838 9046.55 92.07 177.20 4352.95 4431.65 2548.55 6729.81 1124.93 4270.83 11.08 -6.11 9.26 5979493.08 587583.00 N 70.35380705 W 149.28879909 9076.61 95.51 176.43 4350.96 4429.66 2569.08 6759.80 1094.99 4272.50 11.73 11.44 -2.56 5979463.16 587585.00 N 70.35372524 W 149.28878571 9109.05 98.76 175.95 4346.93 4425.63 2591.36 6791.98 1062.87 4274.63 10.13 10.02 -1.48 5979431.08 587587.49 N 70.35363751 W 149.28876849 9140.76 99.26 175.43 4341.97 4420.67 2613.24 6823.30 1031.64 4276.99 2.26 1.58 -1.64 5979399.88 587590.19 N 70.35355219 W 149.28874953 9233.69 99.42 176.43 4326.89 4405.59 2677.01 6915.00 940.18 4283.50 1.08 0.17 1.08 5979308.50 587597.71 N 70.35330230 W 149.28869711 9326.06 99.54 175.60 4311.67 4390.37 2740.28 7006.11 849.29 4289.83 0.90 0.13 -0.90 5979217.70 587605.06 N 70.35305400 W 149.28864613 9378.00 99.54 175.60 4303.06 4381.76 2776.12 7057.33 798.22 4293.76 0.00 0.00 0.00 5979166.68 587609.55 N 70.35291447 W 149.28861446 LSQal Description: NorthlnQ (V) [ftUSl EastlnQ (X) [ftUS] Surface: 2597 FSL 3588 FEL S34 T12N R11E UM 5978320.84 583325.34 BHL: 3394 FSL 4573 FEL S35 T12N R11 E UM 5979166.68 587609.55 SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) N-U\L-201\L-201 L3PB1\L-201 L3PB1 Generated 5/5/2004 1 :36 PM Page 3 of 3 TREE = FMC4-1/6" 5M Wa.LH:AD = FMC G8\I 5 A crUA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = DatumTVD = ) 78.70' 51.93' 300' 94 @ 12711:, 6137' 4400' SS 120" CON[XJcrOR H 110-314" CSG. 45.5#, L-80, ID = 9.95" H 3197' Minimum ID = 3.813" @ 2266' 4-112" HES X NIPPLE IRA TAGH 6179' 17-5/8" X 5-1/2" BKR ZXP A<R ID = 5.75" H 6173' IBKR HlX3I-ES HOOK HGR, ID = 5.64" l-t 6224' 1 RA TAG H 6324' 17-5I8"X5-1/2"BKRZXPPKR,ID=5.75" H 6319' I BKR HlX3HES I-OOK H3R ID = 5.64" H 6367 ÆRFORA TON SUMv1ARY REF LOG: ANGLE AT TOP PERF: xx @ xxxx' Nola: ~fer to Production DB for histoncal perf data SIZE SFF INlERJ AL Opn/Sqz DATE 4-1/2" SLTD OA 6090 - 9802 0 04/24/04 4-1/2" SlTD OBa 6295 - 13405 0 04/18104 4-1/2" SLTD OBb 6434 - 13465 0 04/09104 4-1/2" SLTD OBd 7028 - 13628 0 04/04/04 l7-5/8" CSG, 29.7#, L-80, ID = 6.875" H 7047' ~ 13672' Dð.1E REV BY COMM:NTS 05104104 'rWA/KA~ ORIGINAL COMPLETION r:) I SAr-cTY NOTES: L-20 1 L-201 L 1 L-201 L2 L-201 L3 ~ 114' I I--¡; ~ ::¡ ~ ~ z ~ DATE REV BY I 7 -518" WINDOW @ 6025' 6020' - 9846' 6-3/4"OALATERAl, ID = 3.958" fVi~. 6200' H4-1/2" BKR SEAL ASS8v1BL Y 1 ~_ __ __6__2~_~_ __ __~_5__-1__/2~_' ~_~_1 ~_ '~_XJO' ID = 3.960"1 7-5/8" WINOOW @ 6229' ~ 6224' -13448' 6-3/4" OBa LATERAL, ID = 3.958" ~ 6346' H4-1/2" BKRSEALASSEIVBLY 1 r ~ 6353' H5-1/Z' X4-1f2" XO, ID =3.960"1 ... ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~J 7 -&8" wroow @ 6372 6367'-13506' 6-3/4"OBb LATERAL, ID = 3.958" :g---i I 1 H 7-5/8" X 5-1/2" BKR ZXP LNR TOP PKR, ID = 4.840" H 4-1/2" BKR SEAL ASSEMBLY 1 H5-1/2" X 4-1/2" XO, ID= 3.980" 1 I 2266' H4-1f2" ÆSX NP.ID =3.813" I .. GAS LIFT MAN[RELS ST MD TVD ŒV TYÆ VLV LATCH FORT DATE 4 2370 2101 46 KBG-2 DMY BK-5 0 04/23/04 L 3 3525 2857 50 KBG-2 DMY BK-5 0 04/23/04 2 4680 3612 49 KBG-2 DMY BK-5 0 04/23/04 14-1f2" A-tOENIX DSCt-RGE-PRESS SUB,ID = 3.85"H 5814' ~ I I 11 55872°85' 42H72 57 KBG-2 D0<2 BEK 04/213/04 4-1/2" BKR CM) SLlaNG SLV, ID = 3.812" 14-11.1" RiŒND( JET RJMPSENSOR. ID = 3ß3õ' H 5849' I :g- ~ :::: ~:~:.: :~:;.: ~~:~. ID = 3.875" I IRA TAGH 5975' ~ ~ -~ 5963' H4-112"HESXNIP.ID=3.813" I 17-5/8" X5-1f2" BKRZXPA<R, ID =5.75" H 5982' ~ -fd 6000' H4-1/2" BKRSEAL ASSErveLY 1 I 6001' H 5-1/2" X 4-1/2" XO, ID = 3.960" 1 IBKRHJGHESHOOKHGR,ID =5.64" H 6020' ~¡ .,., ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~J 6432' 6476' 6481 ' r 6922' H RA TAG I 6432'-13672' 6-3/4"OBd LATERAL,ID = 3.958" COM~S O~N UI\IT wa.L: L-201, L-201 L 1, L-201 L2. L-201 L3 ÆRMrr No: 204046 (047) (048) (049) AA No: 5~029-23202-00 (60) (61) (62) SEC 34, T12N, R11 E, 2598' NSL & 3588' wa. BP Exploration (Alaska) \ , SCRLUMBERGER Survey report Client... ...... ...... ....: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . . .: Orion Well. . . . . . . . . . . . . . . . . . . . .: L-201 L3 API number...............: 50-029-23202-62 Engineer............. ....: Mark St. Amour RIG Label:.. ........... ..: NABORS 9ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS......... ..: Mason & Taylor ----- Depth reference ----------------------- Permanent datum....... ...: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.. .., ..: 50.20 ft KB above permanent... ....: N/A (Top Drive) DF above permanent..... ..: 78.70 ft ----- Vertical section origin---------------- Latitude (+N/S-). ........: 0.00 ft Departure (+E/W-)...... ..: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-)....... ..: -999.25 ft Departure (+E/W-)..... ...: -999.25 ft Azimuth from rotary table to target: 130.00 degrees 26-Apr-2004 14:08:03 Spud date... . . . . . . . . . . . . . : Last survey date.........: Total accepted surveys...: MD of first survey.......: MD of last survey........: Page 1 of 8 17-March-2004 26-Apr-04 189 0.00 ft 9860.00 ft ----- Geomagnetic data ---------------------- Magnetic model.... .......: BGGM version 2003 Magnetic date..... .......: 20-Apr-2004 Magnetic field strength..: 1151.26 RCNT Magnetic dec (+E/W-).....: 24.99 degrees Magnetic dip. ............: 80.82 degrees ----- MWD survey Reference Reference G.. ......... ...: Reference R. ..... ........: Reference Dip.......... ..: Tolerance of G...........: Tolerance of R.. .........: Tolerance of Dip.........: Criteria --------- 1002.68 mGal 1151.26 RCNT 80.82 degrees (+/-) 2.50 mGal (+/-) 6.00 RCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.99 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.99 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction Æ ß '1 - 0 '"'I ~ c e ~. " c " "- \. X " e SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 2 of 8 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYRO None 3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYRO None 4 324.00 2.13 19.40 100.00 323.97 -1. 57 2.37 -0.05 2.38 358.72 1. 76 GYRO None 5 395.00 4.15 21.01 71.00 394.86 -2.87 6.02 1.31 6.16 12.25 2.85 GYRO None 6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYRO None e 7 595.00 8.86 11. 46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYRO None 8 695.00 11.87 12.48 100.00 691. 99 -20.13 44.33 10.92 45.65 13.83 3.02 GYRO None 9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG 10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21. 32 86.02 14.35 3.12 MWD GMAG 11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115.96 14.89 2.38 MWD GMAG 12 1040.82 22.84 16.89 93.36 1021. 28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG 13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG 14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG 15 1321.50 29.42 18.07 95.37 1272.00 -111.15 264.57 76.90 275.52 16.21 1. 53 MWD GMAG 16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91.86 323.53 16.49 1. 77 MWD GMAG 17 1511.08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1. 83 MWD GMAG 18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG 19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG 20 1797.56 36.27 18.62 98.02 1671.38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG 21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591.00 17.60 0.97 MWD GMAG e 22 1988.07 39.87 19.15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG 23 2081.93 41.57 20.11 93.86 1893.38 -267.74 677.09 218.63 711.51 17.90 1. 93 MWD GMAG 24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG 25 2269.96 45.03 20.88 94.18 2030.82 -311. 34 797.53 262.78 839.71 18.24 2.56 MWD GMAG 26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG 27 2458.33 47.95 21. 23 96.59 2161.62 -355.21 923.95 311.59 975.08 18.64 2.54 MWD GMAG 28 2552.24 48.94 21.51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG 29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG 30 2740.10 50.69 21. 63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 3 of 8 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 2834.26 50.10 21. 09 94.16 2405.24 -446.33 1190.40 416.22 1261.07 19.27 0.77 MWD GMAG 32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG 33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG 34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG 35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501. 52 19.80 0.67 MWD GMAG 36 3266.50 47.43 25.10 114.34 2688.89 -541. 75 1490.59 543.55 1586.61 20.03 1.92 MWD GMAG e 37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561.57 1630.69 20.14 4.16 MWD GMAG 38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG 39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG 40 3609.16 49.34 23.32 93.81 2911.68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG 41 3701.35 50.03 21. 52 92.19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1. 67 MWD GMAG 42 3794.96 50.31 21.39 93.61 3031.29 -659.14 1860.94 701.06 1988.61 20.64 0.32 MWD GMAG 43 3888.81 50.23 21. 33 93.85 3091.27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG 44 3982.46 49.83 20.65 93.65 3151. 43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG 45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG 46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277.18 20.66 0.55 MWD GMAG 47 4266.06 48.39 21. 00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG 48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG 49 4454.28 47.80 22.75 94.27 3461.74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG 50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG 51 4641.89 48.96 31. 87 93.78 3586.62 -853.25 2451.68 943.36 2626.91 21.05 4.03 MWD GMAG e 52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21. 38 3.58 MWD GMAG 53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21. 82 3.66 MWD GMAG 54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG 55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG 56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG 57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG 58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG 59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG 60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451.92 3156.80 27.38 5.64 MWD GMAG SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 4 of 8 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG 62 5677.97 56.15 89.22 95.09 4255.06 -581.22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG 63 5769.98 58.26 91. 53 92.01 4304.90 -521.65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG 64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG 65 5955.46 61.37 98.97 93.30 4399.26 -390.85 2802.35 1841. 23 3353.10 33.31 4.62 MWD GMAG 66 6025.00 63.75 101. 66 69.54 4431. 31 -337.23 2791.28 1901. 93 3377.66 34.27 4.85 TOP OF WINDOW e 67 6037.00 65.61 102.17 12.00 4436.44 -327.67 2789.04 1912.55 3381.80 34.44 15.97 BOTTOM WINDOW 68 6067.17 69.45 102.59 30.17 4447.97 -302.97 2783.06 1939.77 3392.37 34.88 12.79 MWD Incl. Only 69 6098.49 73.46 103.02 31. 32 4457.93 -276.56 2776.48 1968.72 3403.63 35.34 12.87 MWD Incl. Only 70 6129.29 77.29 103.45 30.80 4465.71 -249.96 2769.66 1997.73 3414.96 35.80 12.51 MWD Incl. Only 71 6160.61 80.90 103.88 31. 32 4471.63 -222.40 2762.40 2027.60 3426.66 36.28 11.60 MWD Incl. Only 72 6191.13 83.52 104.30 30.52 4475.77 -195.20 2755.03 2056.93 3438.19 36.75 8.69 MWD GMAG 73 6223.02 83.49 104.20 31.89 4479.38 -166.66 2747.24 2087.64 3450.44 37.23 0.33 MWD GMAG 74 6254.04 85.41 106.75 31.02 4482.38 -138.58 2739.00 2117.39 3462.00 37.71 10.26 MWD GMAG 75 6284.62 89.47 108.79 30.58 4483.74 -110.30 2729.68 2146.48 3472.53 38.18 14.85 MWD GMAG 76 6315.35 93.21 111.40 30.73 4483.02 -81. 43 2719.12 2175.32 3482.19 38.66 14.84 MWD GMAG 77 6347.35 95.13 111.33 32.00 4480.70 -51.19 2707.50 2205.04 3491.81 39.16 6.00 MWD GMAG 78 6378.38 95.10 112.78 31.03 4477.93 -21.78 2695.89 2233.68 3501.03 39.64 4.66 MWD GMAG 79 6409.80 95.11 113.80 31. 42 4475.13 8.19 2683.52 2262.43 3509.97 40.13 3.23 MWD GMAG 80 6441. 44 95.58 115.26 31. 64 4472.19 38.55 2670.44 2291. 09 3518.57 40.63 4.83 MWD GMAG 81 6472 .14 94.42 115.42 30.70 4469.51 68.14 2657.35 2318.73 3526.76 41.11 3.81 MWD GMAG e 82 6503.35 95.03 116.94 31. 21 4466.94 98.34 2643.63 2346.64 3534.90 41. 59 5.23 MWD GMAG 83 6534.97 95.27 120.06 31. 62 4464.10 129.20 2628.60 2374.31 3542.16 42.09 9.86 MWD GMAG 84 6565.63 95.17 121. 20 30.66 4461. 31 159.32 2613 .05 2400.59 3548.36 42.57 3.72 MWD GMAG 85 6597.06 95.27 122.26 31.43 4458.45 190.29 2596.59 2427.21 3554.38 43.07 3.37 MWD GMAG 86 6627.98 95.24 122.20 30.92 4455.62 220.80 2580.17 2453.25 3560.30 43.56 0.22 MWD GMAG 87 6658.52 94.72 120.34 30.54 4452.97 250.87 2564.37 2479.26 3566.89 44.03 6.30 MWD GMAG 88 6689.96 92.73 117.86 31.44 4450.93 281.68 2549.12 2506.67 3575.11 44.52 10.10 MWD GMAG 89 6722.28 92.11 118.28 32.32 4449.56 313.27 2533.92 2535.16 3584.38 45.01 2.32 MWD GMAG 90 6753.12 92 .49 119.35 30.84 4448.32 343.50 2519.07 2562.16 3593.10 45.49 3.68 MWD GMAG SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 5 of 8 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 6784.35 92.52 119.42 31.23 4446.96 374.17 2503.76 2589.34 3601.88 45.96 0.24 MWD GMAG 92 6816.02 92.73 119.54 31. 67 4445.51 405.27 2488.19 2616.88 3610.98 46.44 0.76 MWD GMAG 93 6846.65 92.38 118.96 30.63 4444.14 435.33 2473.24 2643.58 3620.15 46.91 2.21 MWD GMAG 94 6877 . 53 90.50 121. 42 30.88 4443.37 465.75 2457.72 2670.26 3629.14 47.37 10.02 MWD GMAG 95 6909.80 90.26 121.06 32.27 4443.15 497.64 2440.99 2697.85 3638.24 47.86 1. 34 MWD GMAG 96 6940.05 90.57 118.38 30.25 4442.93 527.40 2425.99 2724.12 3647.77 48.31 8.92 MWD GMAG e 97 6971.84 90.02 120.46 31. 79 4442.77 558.65 2410.38 2751.81 3658.19 48.78 6.77 MWD GMAG 98 7002.09 91. 29 119.49 30.25 4442.42 588.43 2395.26 2778.01 3668.05 49.23 5.28 MWD GMAG 99 7032.71 89.74 120.63 30.62 4442.15 618.59 2379.93 2804.51 3678.22 49.68 6.28 MWD GMAG 100 7064.12 89.37 119.22 31.41 4442.39 649.52 2364.26 2831.73 3688.96 50.14 4.64 MWD GMAG 101 7095.24 89.43 119.61 31.12 4442.72 680.10 2348.98 2858.84 3700.09 50.59 1.27 MWD GMAG 102 7127.33 90.09 120.48 32.09 4442.85 711.71 2332.91 2886.61 3711.47 51.06 3.40 MWD GMAG 103 7156.37 90.46 120.75 29.04 4442.71 740.36 2318.12 2911.61 3721.71 51. 47 1.58 MWD GMAG 104 7188.49 89.06 122.08 32.12 4442.85 772.12 2301.38 2939.02 3732.85 51.94 6.01 MWD GMAG 105 7219.01 88.78 121.55 30.52 4443.42 802.32 2285.29 2964.95 3743.46 52.38 1. 96 MWD GMAG 106 7250.14 89.06 122.40 31.13 4444.01 833.14 2268.81 2991.35 3754.42 52.82 2.87 MWD GMAG 107 7282.07 88.75 121. 85 31.93 4444.62 864.77 2251. 83 3018.38 3765.82 53.28 1. 98 MWD GMAG 108 7312.23 88.54 124.48 30.16 4445.33 894.70 2235.34 3043.62 3776.29 53.71 8.75 MWD GMAG 109 7343.68 88.72 121.62 31. 45 4446.09 925.91 2218.20 3069.97 3787.50 54.15 9.11 MWD GMAG 110 7373.72 88.75 123.81 30.04 4446.75 955.70 2201. 97 3095.24 3798.57 54.57 7.29 MWD GMAG 111 7405.43 90.40 121. 45 31.71 4446.98 987.14 2184.87 3121. 94 3810.53 55.01 9.08 MWD GMAG - 112 7436.75 90.53 123.10 31. 32 4446.73 1018.17 2168.15 3148.42 3822.75 55.45 5.28 MWD GMAG 113 7468.41 90.57 121.71 31.66 4446.43 1049.55 2151.18 3175.15 3835.25 55.88 4.39 MWD GMAG 114 7499.57 89.95 122.55 31.16 4446.28 1080.42 2134.61 3201.54 3847.91 56.31 3.35 MWD GMAG 115 7531.47 89.54 119.47 31.90 4446.43 1111 . 92 2118.18 3228.87 3861. 64 56.73 9.74 MWD GMAG 116 7561.83 88.89 118.27 30.36 4446.84 1141.71 2103.52 3255.46 3875.92 57.13 4.49 MWD GMAG 117 7590.92 88.61 119.15 29.09 4447.48 1170.23 2089.55 3280.96 3889.85 57.51 3.17 MWD GMAG 118 7623.38 88.58 118.53 32.46 4448.27 1202.07 2073.90 3309.39 3905.52 57.93 1.91 MWD GMAG 119 7652.38 89.02 116.24 29.00 4448.88 1230.36 2060.56 3335.13 3920.33 58.29 8.04 MWD GMAG 120 7683.48 89.09 116.61 31.10 4449.39 1260.58 2046.72 3362.98 3936.84 58.68 1.21 MWD GMAG SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 6 of 8 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 121 7714.85 88.47 116.22 31.37 4450.06 1291. 07 2032.77 3391.07 3953.67 59.06 2.33 MWD GMAG 122 7745.61 88.44 116.39 30.76 4450.89 1320.94 2019.14 3418.63 3970.39 59.43 0.56 MWD GMAG 123 7774.09 87.68 116.91 28.48 4451.86 1348.64 2006.38 3444.07 3985.87 59.78 3.23 MWD GMAG 124 7806.71 87.58 118.22 32.62 4453.20 1380.46 1991. 30 3472.96 4003.34 60.17 4.02 MWD GMAG 125 7837.79 88.23 119.57 31.08 4454.34 1410.94 1976.29 3500.15 4019.55 60.55 4.82 MWD GMAG 126 7867.60 88.27 119.45 29.81 4455.25 1440.24 1961.61 3526.09 4035.00 60.91 0.42 MWD GMAG e 127 7898.39 88.37 116.56 30.79 4456.15 1470.34 1947.16 3553.26 4051.80 61. 28 9.39 MWD GMAG 128 7928.76 87.99 116.47 30.37 4457.12 1499.86 1933.61 3580.42 4069.18 61.63 1.29 MWD GMAG 129 7959.52 88.20 116.29 30.76 4458.14 1529.74 1919.95 3607.96 4087.00 61.98 0.90 MWD GMAG 130 7990.53 87.85 116.56 31.01 4459.21 1559.86 1906.16 3635.71 4105.10 62.33 1.43 MWD GMAG 131 8020.99 87.31 11 7.62 30.46 4460.50 1589.53 1892.30 3662.81 4122.74 62.68 3.90 MWD GMAG 132 8051. 50 87.93 116.47 30.51 4461. 76 1619.23 1878.44 3689.96 4140.57 63.02 4.28 MWD GMAG 133 8082.17 88.20 118.70 30.67 4462.80 1649.17 1864.25 3717.12 4158.41 63.36 7.32 MWD GMAG 134 8112.99 87.96 120.34 30.82 4463.83 1679.45 1849.07 3743.93 4175.65 63.72 5.37 MWD GMAG 135 8143.89 87.65 120.51 30.90 4465.01 1709.90 1833.43 3770.55 4192.68 64.07 1.14 MWD GMAG 136 8173.86 87.00 122.75 29.97 4466.41 1739.52 1817.73 3796.04 4208.81 64.41 7.77 MWD GMAG 137 8205.63 87.17 125.08 31.77 4468.03 1771.07 1800.03 3822.37 4225.00 64.78 7.34 MWD GMAG 138 8235.82 86.82 125.40 30.19 4469.61 1801.11 1782.64 3846.99 4239.94 65.14 1. 57 MWD GMAG 139 8266.75 86.65 126.22 30.93 4471.37 1831. 91 1764.57 3872.03 4255.15 65.50 2.70 MWD GMAG 140 8297.62 87.00 129.37 30.87 4473.08 1862.70 1745.68 3896.39 4269.57 65.87 10.25 MWD GMAG 141 8328.73 87.10 129.44 31.11 4474.68 1893.77 1725.96 3920.39 4283.50 66.24 0.39 MWD GMAG e 142 8360.17 87.89 131. 46 31. 44 4476.06 1925.18 1705.58 3944.29 4297.26 66.62 6.89 MWD GMAG 143 8390.77 88.17 134.05 30.60 4477 .11 1955.72 1684.82 3966.75 4309.72 66.99 8.51 MWD GMAG 144 8421. 23 88.13 133.80 30.46 4478.09 1986.09 1663.70 3988.67 4321.74 67.36 0.83 MWD GMAG 145 8452.92 89.19 135.82 31. 69 4478.84 2017.66 1641.38 4011.15 4333.99 67.75 7.20 MWD GMAG 146 8484.40 91.87 138.37 31. 48 4478.54 2048.90 1618.32 4032.58 4345.19 68.13 11.75 MWD GMAG 147 8515.24 92.14 139.39 30.84 4477.47 2079.35 1595.10 4052.84 4355.45 68.52 3.42 MWD GMAG 148 8546.65 92.76 139.43 31. 41 4476.12 2110.30 1571. 27 4073.26 4365.82 68.91 1. 98 MWD GMAG 149 8577.42 95.97 142.15 30.77 4473.78 2140.44 1547.51 4092.65 4375.45 69.29 13.66 MWD GMAG 150 8608.76 96.89 142.46 31. 34 4470.27 2170.86 1522.87 4111.70 4384.65 69.68 3.10 MWD GMAG SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 7 of 8 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 151 8640.22 95.00 145.32 31. 46 4467.01 2201.23 1497.59 4130.13 4393.27 70.07 10.86 MWD GMAG 152 8671.29 93.62 145.93 31. 07 4464.68 2231. 07 1472.02 4147.63 4401. 09 70.46 4.85 MWD GMAG 153 8702.65 92.70 146.68 31. 36 4462.95 2261.12 1445.97 4165.00 4408.86 70.85 3.78 MWD GMAG 154 8734.17 91.70 148.49 31. 52 4461.74 2291.15 1419.38 4181.88 4416.19 71. 25 6.56 MWD GMAG 155 8765.49 92.35 146.21 31.32 4460.63 2321. 02 1393.03 4198.76 4423.82 71. 65 7.57 MWD GMAG 156 8796.85 95.28 143.87 31. 36 4458.55 2351. 23 1367.39 4216.69 4432.86 72.03 11.95 MWD GMAG e 157 8827.80 95.21 143.54 30.95 4455.72 2381.18 1342.55 4234.93 4442.65 72.41 1. 09 MWD GMAG 158 8860.34 92.28 144.59 32.54 4453.59 2412.67 1316.26 4253.99 4452.97 72.81 9.56 MWD GMAG 159 8891. 06 91.15 148.72 30.72 4452.67 2442.08 1290.61 4270.86 4461. 61 73.19 13.93 MWD GMAG 160 8923.00 89.47 151. 00 31.94 4452.50 2472.12 1262.99 4286.90 4469.08 73.58' 8.87 MWD GMAG 161 8953.54 87.58 152.89 30.54 4453.28 2500.43 1236.05 4301.25 4475.33 73.97 8.75 MWD GMAG 162 8984.50 87.55 157.09 30.96 4454.60 2528.46 1208.03 4314.33 4480.26 74.36 13.55 MWD GMAG 163 9016.10 88.78 158.90 31. 60 4455.61 2556.35 1178.75 4326.16 4483.87 74.76 6.92 MWD GMAG 164 9046.88 87.48 162.73 30.78 4456.62 2582.76 1149.70 4336.27 4486.09 75.15 13 .13 MWD GMAG 165 9077.63 87.68 166.69 30.75 4457.92 2608.01 1120.07 4344.37 4486.44 75.54 12.88 MWD GMAG 166 9108.92 88.20 170.29 31. 29 4459.04 2632.49 1089.43 4350.61 4484.94 75.94 11.62 MWD GMAG 167 9140.61 87.27 172.71 31. 69 4460.29 2656.20 1058.12 4355.29 4481.98 76.34 8.18 MWD GMAG 168 9171. 73 86.17 177.05 31.12 4462.07 2678.21 1027.18 4358.06 4477.48 76.74 14.36 MWD GMAG 169 9203.61 88.16 180.15 31.88 4463.65 2699.26 995.36 4358.84 4471.04 77.14 11.54 MWD GMAG 170 9234.10 90.33 182.00 30.49 4464.05 2718.42 964.88 4358.27 4463.80 77.52 9.35 MWD GMAG 171 9265.19 90.29 182.60 31.09 4463.89 2737.43 933.81 4357.02 4455.96 77.90 1. 93 MWD GMAG e 172 9296.32 90.57 182.48 31.13 4463.65 2756.36 902.71 4355.64 4448.20 78.29 0.98 MWD GMAG 173 9326.11 91.01 181. 28 29.79 4463.24 2774.75 872.94 4354.66 4441.30 78.66 4.29 MWD GMAG 174 9357.55 89.71 182.70 31. 44 4463.04 2794.11 841.52 4353.57 4434.16 79.06 6.12 MWD GMAG 175 9389.23 89.47 182.21 31. 68 4463.27 2813.41 809.87 4352.21 4426.92 79.46 1. 72 MWD GMAG 176 9421.98 89.88 182.34 32.75 4463.46 2833.45 777.15 4350.91 4419.77 79.87 1.31 MWD GMAG 177 9452.68 89.47 184.35 30.70 4463.63 2851.78 746.51 4349.12 4412.72 80.26 6.68 MWD GMAG 178 9483.53 90.63 183.01 30.85 4463.60 2870.05 715.72 4347.14 4405.67 80.65 5.74 MWD GMAG 179 9515.45 94.48 183.68 31.92 4462.18 2889.08 683.89 4345.28 4398.77 81. 06 12.24 MWD GMAG 180 9545.57 97.27 185.48 30.12 4459.10 2906.45 654.03 4342.89 4391.86 81.44 11. 01 MWD GMAG .. SCHLUMBERGER Survey Report 26-Apr-2004 14:08:03 Page 8 of 8 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 181 9576.71 96.82 185.55 31.14 4455.28 2923.94 623.27 4339.92 4384.45 81.83 1.46 MWD GMAG 182 9607.62 97.41 185.76 30.91 4451. 45 2941.25 592.75 4336.90 4377.22 82.22 2.02 MWD GMAG 183 9639.43 97.69 185.01 31.81 4447.27 2959.16 561.35 4333.94 4370.14 82.62 2.50 MWD GMAG 184 9669.37 97.17 185.92 29.94 4443.40 2975.99 531.80 4331.11 4363.64 83.00 3.48 MWD GMAG 185 9701. 64 97.76 183.22 32.27 4439.20 2994.54 499.91 4328.56 4357.33 83.41 8.50 MWD GMAG 186 9732.38 96.20 184.73 30.74 4435.47 3012.48 469.47 4326.45 4351. 84 83.81 7.04 MWD GMAG e 187 9762.92 95.65 184.87 30.54 4432.32 3029.99 439.20 4323.90 4346.15 84.20 1. 86 MWD GMAG 188 9809.89 96 .16 183.39 46.97 4427.48 3057.37 392.60 4320.54 4338.34 84.81 3.32 MWD GMAG 189 9860.00 96.16 183.39 50.11 4422.11 3087.08 342.87 4317.59 4331.19 85.46 0.00 Projected To TD [(c)2004 IDEAL ID8_1C_01] e ~ ~ SCHLUMBERGER Survey report Client.... ........ .......: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . . .: Orion Well...... .... ....... ....: L-201 L3 PB1 API number.... ....... ....: 50-029-23202-73 Engineer. ...... ..........: Mark St. Amour RIG Label:........... ....: NABORS 9ES STATE:............... ....: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS........ ...: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 50.20 ft KB above permanent.......: N/A (Top Drive) DF above permanent.... ...: 78.70 ft ----- Vertical section origin---------------- Latitude (+N/S-).. ... ....: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).. .......: -999.25 ft Departure (+E/W-). .......: -999.25 ft Azimuth from rotary table to target: 130.00 degrees 25-Apr-2004 10:07:03 Spud date........ ... .....: Last survey date..... ....: Total accepted surveys...: MD of first survey.. .....: MD of last survey.... ....: Page 1 of 7 17-March-2004 25-Apr-04 170 0.00 ft 9378.00 ft e ----- Geomagnetic data ---------------------- Magnetic model..... ......: BGGM version 2003 Magnetic date...... ......: 20-Apr-2004 Magnetic field strength..: 1151.26 HCNT Magnetic dec (+E/W-) .....: 24.99 degrees Magnetic dip.. ..... ......: 80.82 degrees ----- MWD survey Reference Reference G........ ......: Reference H....... .......: Reference Dip..... .......: Tolerance of G.... ..... ..: Tolerance of H........ ...: Tolerance of Dip.. .......: Criteria --------- 1002.68 mGal 1151.26 HCNT 80.82 degrees (+/-) 2.50 mGal (+/-) 6.00 HCNT (+/-) 0.45 degrees < \ ~ e ----- Corrections --------------------------- Magnetic dec (+E/W-) .....: 24.99 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) ....: 24.99 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction ~ò~-6~1 SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 2 of 7 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 124.00 0.22 237.38 124.00 124.00 -0.07 -0.13 -0.20 0.24 237.38 0.18 GYRO None 3 224.00 0.52 340.14 100.00 224.00 -0.52 0.19 -0.52 0.55 290.69 0.61 GYRO None 4 324.00 2.13 19.40 100.00 323.97 -1. 57 2.37 -0.05 2.38 358.72 1. 76 GYRO None 5 395.00 4.15 21. 01 71.00 394.86 -2.87 6.02 1. 31 6.16 12.25 2.85 GYRO None 6 495.00 5.88 17.19 100.00 494.47 -6.03 14.29 4.12 14.87 16.07 1. 76 GYRO None e 7 595.00 8.86 11. 46 100.00 593.64 -11.70 26.73 7.16 27.68 15.00 3.07 GYRO None 8 695.00 11.87 12.48 100.00 691. 99 -20.13 44.33 10.92 45.65 13.83 3.02 GYRO None 9 758.99 14.48 14.62 63.99 754.29 -26.60 58.50 14.36 60.23 13.79 4.15 MWD GMAG 10 853.05 17.37 16.52 94.06 844.74 -37.24 83.34 21.32 86.02 14.35 3.12 MWD GMAG 11 947.46 19.62 16.37 94.41 934.26 -49.21 112.06 29.80 115.96 14.89 2.38 MWD GMAG 12 1040.82 22.84 16.89 93.36 1021. 28 -62.61 144.45 39.48 149.75 15.29 3.45 MWD GMAG 13 1132.91 25.75 16.87 92.09 1105.20 -77.48 180.70 50.48 187.62 15.61 3.16 MWD GMAG 14 1226.13 27.99 17.46 93.22 1188.35 -93.82 220.95 62.92 229.74 15.90 2.42 MWD GMAG 15 1321. 50 29.42 18.07 95.37 1272.00 -111.15 264.57 76.90 275.52 16.21 1. 53 MWD GMAG 16 1416.81 31.11 18.21 95.31 1354.32 -129.04 310.22 91. 86 323.53 16.49 1.77 MWD GMAG 17 1511.08 32.79 18.97 94.27 1434.30 -147.24 357.49 107.77 373.39 16.78 1. 83 MWD GMAG 18 1604.81 34.13 19.21 93.73 1512.50 -165.68 406.33 124.67 425.03 17.06 1.44 MWD GMAG 19 1699.54 33.73 19.32 94.73 1591.10 -184.40 456.24 142.12 477.87 17.30 0.43 MWD GMAG 20 1797.56 36.27 18.62 98.02 1671.38 -204.58 509.41 160.38 534.06 17.48 2.62 MWD GMAG 21 1892.80 37.18 18.91 95.24 1747.72 -225.21 563.33 178.70 591.00 17.60 0.97 MWD GMAG e 22 1988.07 39.87 19.15 95.27 1822.25 -246.44 619.42 198.05 650.32 17.73 2.83 MWD GMAG 23 2081.93 41.57 20.11 93.86 1893.38 -267.74 677.09 218.63 711. 51 17.90 1. 93 MWD GMAG 24 2175.78 42.75 19.75 93.85 1962.95 -289.36 736.31 240.10 774.47 18.06 1.28 MWD GMAG 25 2269.96 45.03 20.88 94.18 2030.82 -311.34 797.53 262.78 839.71 18.24 2.56 MWD GMAG 26 2361.74 45.50 21.16 91.78 2095.42 -332.55 858.39 286.17 904.83 18.44 0.56 MWD GMAG 27 2458.33 47.95 21. 23 96.59 2161.62 -355.21 923.95 311.59 975.08 18.64 2.54 MWD GMAG 28 2552.24 48.94 21. 51 93.91 2223.92 -377.66 989.39 337.20 1045.28 18.82 1. 08 MWD GMAG 29 2645.64 49.74 21. 45 93.40 2284.77 -400.17 1055.32 363.14 1116.06 18.99 0.86 MWD GMAG 30 2740.10 50.69 21.63 94.46 2345.22 -423.15 1122.84 389.79 1188.57 19.14 1. 02 MWD GMAG SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 3 of 7 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr (ft) (deg) (de g) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 2834.26 50.10 21.09 94.16 2405.24 -446.33 1190.40 416.22 1261.07 19.27 0.77 MWD GMAG 32 2928.38 49.29 22.08 94.12 2466.13 -469.01 1257.15 442.62 1332.79 19.40 1.18 MWD GMAG 33 3022.90 49.04 23.22 94.52 2527.93 -490.34 1323.14 470.16 1404.19 19.56 0.95 MWD GMAG 34 3117.47 48.89 23.30 94.57 2590.02 -510.88 1388.68 498.33 1475.38 19.74 0.17 MWD GMAG 35 3152.16 49.11 23.20 34.69 2612.78 -518.43 1412.73 508.66 1501.52 19.80 0.67 MWD GMAG 36 3266.50 47.43 25.10 114.34 2688.89 -541.75 1490.59 543.55 1586.61 20.03 1. 92 MWD GMAG e 37 3325.61 49.36 23.06 59.11 2728.14 -553.88 1530.95 561.57 1630.69 20.14 4.16 MWD GMAG 38 3420.36 50.09 23.79 94.75 2789.39 -574.50 1597.27 590.31 1702.87 20.28 0.97 MWD GMAG 39 3515.35 49.54 23.70 94.99 2850.68 -594.82 1663.70 619.53 1775.31 20.42 0.58 MWD GMAG 40 3609.16 49.34 23.32 93.81 2911. 68 -615.04 1729.05 647.96 1846.48 20.54 0.37 MWD GMAG 41 3701.35 50.03 21. 52 92.19 2971.33 -636.28 1794.03 674.77 1916.73 20.61 1.67 MWD GMAG 42 3794.96 50.31 21.39 93.61 3031. 29 -659.14 1860.94 701.06 1988.61 20.64 0.32 MWD GMAG 43 3888.81 50.23 21. 33 93.85 3091.27 -682.21 1928.16 727.35 2060.78 20.67 0.10 MWD GMAG 44 3982.46 49.83 20.65 93.65 3151.43 -705.59 1995.16 753.06 2132.55 20.68 0.70 MWD GMAG 45 4076.83 49.57 20.57 94.37 3212.47 -729.48 2062.53 778.39 2204.52 20.68 0.28 MWD GMAG 46 4172.21 49.68 19.90 95.38 3274.26 -754.06 2130.71 803.52 2277 .18 20.66 0.55 MWD GMAG 47 4266.06 48.39 21.00 93.85 3335.78 -777.78 2197.11 828.28 2348.05 20.66 1.63 MWD GMAG 48 4360.01 47.90 21.14 93.95 3398.47 -800.48 2262.41 853.43 2418.02 20.67 0.53 MWD GMAG 49 4454.28 47.80 22.75 94.27 3461.74 -822.14 2327.23 879.55 2487.89 20.70 1.27 MWD GMAG 50 4548.11 48.18 26.94 93.83 3524.55 -840.35 2390.47 908.84 2557.40 20.82 3.34 MWD GMAG 51 4641. 89 48.96 31.87 93.78 3586.62 -853.25 2451. 68 943.36 2626.91 21.05 4.03 MWD GMAG e 52 4735.40 48.79 36.31 93.51 3648.14 -860.51 2509.98 982.82 2695.54 21. 38 3.58 MWD GMAG 53 4829.57 48.97 40.88 94.17 3710.09 -862.24 2565.40 1027.05 2763.35 21.82 3.66 MWD GMAG 54 4923.41 48.83 47.15 93.84 3771.81 -857.30 2616.21 1076.14 2828.89 22.36 5.04 MWD GMAG 55 5016.44 49.09 54.19 93.03 3832.94 -844.31 2660.62 1130.36 2890.78 23.02 5.71 MWD GMAG 56 5110.60 48.23 58.33 94.16 3895.15 -824.54 2699.89 1189.11 2950.15 23.77 3.42 MWD GMAG 57 5204.87 49.16 62.86 94.27 3957.39 -799.63 2734.62 1250.78 3007.09 24.58 3.74 MWD GMAG 58 5298.92 47.75 68.46 94.05 4019.79 -769.20 2763.65 1314.85 3060.48 25.44 4.70 MWD GMAG 59 5392.93 49.39 73.49 94.01 4082.02 -732.92 2786.57 1381.46 3110.21 26.37 4.37 MWD GMAG 60 5487.16 51.11 80.03 94.23 4142.31 -689.56 2803.10 1451.92 3156.80 27.38 5.64 MWD GMAG SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 4 of 7 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Carr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 5582.88 53.94 84.88 95.72 4200.56 -638.27 2813.00 1527.19 3200.83 28.50 4.99 MWD GMAG 62 5677.97 56.15 89.22 95.09 4255.06 -581. 22 2816.97 1604.99 3242.12 29.67 4.40 MWD GMAG 63 5769.98 58.26 91.53 92.01 4304.90 -521.65 2816.45 1682.32 3280.64 30.85 3.12 MWD GMAG 64 5862.16 59.02 94.81 92.18 4352.88 -458.65 2812.09 1760.89 3317.92 32.05 3.15 MWD GMAG 65 5955.46 61.37 98.97 93.30 4399.26 -390.85 2802.35 1841.23 3353.10 33.31 4.62 MWD GMAG 66 6025.00 63.75 101.66 69.54 4431.31 -337.23 2791.28 1901.93 3377.66 34.27 4.85 TOP OF WINDOW e 67 6037.00 65.61 102.17 12.00 4436.44 -327.67 2789.04 1912.55 3381.80 34.44 15.97 BOTTOM WINDOW 68 6067.17 69.45 102.59 30.17 4447.97 -302.97 2783.06 1939.77 3392.37 34.88 12.79 MWD Incl. Only 69 6098.49 73.46 103.02 31. 32 4457.93 -276.56 2776.48 1968.72 3403.63 35.34 12.87 MWD Incl. Only 70 6129.29 77.29 103.45 30.80 4465.71 -249.96 2769.66 1997.73 3414.96 35.80 12.51 MWD Incl. Only 71 6160.61 80.90 103.88 31. 32 4471.63 -222.40 2762.40 2027.60 3426.66 36.28 11.60 MWD Incl. Only 72 6191.13 83.52 104.30 30.52 4475.77 -195.20 2755.03 2056.93 3438.19 36.75 8.69 MWD GMAG 73 6223.02 83.49 104.20 31. 89 4479.38 -166.66 2747.24 2087.64 3450.44 37.23 0.33 MWD GMAG 74 6254.04 85.41 106.75 31. 02 4482.38 -138.58 2739.00 2117.39 3462.00 37.71 10.26 MWD GMAG 75 6284.62 89.47 108.79 30.58 4483.74 -110.30 2729.68 2146.48 3472.53 38.18 14.85 MWD GMAG 76 6315.35 93.21 111. 40 30.73 4483.02 -81. 43 2719.12 2175.32 3482.19 38.66 14.84 MWD GMAG 77 6347.35 95.13 111. 33 32.00 4480.70 -51.19 2707.50 2205.04 3491. 81 39.16 6.00 MWD GMAG 78 6378.38 95.10 112.78 31.03 4477.93 -21.78 2695.89 2233.68 3501.03 39.64 4.66 MWD GMAG 79 6409.80 95.11 113.80 31.42 4475.13 8.19 2683.52 2262.43 3509.97 40.13 3.23 MWD GMAG 80 6441. 44 95.58 115.26 31. 64 4472.19 38.55 2670.44 2291.09 3518.57 40.63 4.83 MWD GMAG 81 6472.14 94.42 115.42 30.70 4469.51 68.14 2657.35 2318.73 3526.76 41.11 3.81 MWD GMAG e 82 6503.35 95.03 116.94 31. 21 4466.94 98.34 2643.63 2346.64 3534.90 41. 59 5.23 MWD GMAG 83 6534.97 95.27 120.06 31. 62 4464.10 129.20 2628.60 2374.31 3542.16 42.09 9.86 MWD GMAG 84 6565.63 95.17 121. 20 30.66 4461.31 159.32 2613.05 2400.59 3548.36 42.57 3.72 MWD GMAG 85 6597.06 95.27 122.26 31. 43 4458.45 190.29 2596.59 2427.21 3554.38 43.07 3.37 MWD GMAG 86 6627.98 95.24 122.20 30.92 4455.62 220.80 2580.17 2453.25 3560.30 43.56 0.22 MWD GMAG 87 6658.52 94.72 120.34 30.54 4452.97 250.87 2564.37 2479.26 3566.89 44.03 6.30 MWD GMAG 88 6689.96 92.73 117.86 31. 44 4450.93 281.68 2549.12 2506.67 3575.11 44.52 10.10 MWD GMAG 89 6722.28 92.11 118.28 32.32 4449.56 313.27 2533.92 2535.16 3584.38 45.01 2.32 MWD GMAG 90 6753.12 92.49 119.35 30.84 4448.32 343.50 2519.07 2562.16 3593.10 45.49 3.68 MWD GMAG SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 5 of 7 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 6784.35 92.52 119.42 31. 23 4446.96 374.17 2503.76 2589.34 3601.88 45.96 0.24 MWD GMAG 92 6816.02 92.73 119.54 31.67 4445.51 405.27 2488.19 2616.88 3610.98 46.44 0.76 MWD GMAG 93 6846.65 92 .38 118.96 30.63 4444.14 435.33 2473.24 2643.58 3620.15 46.91 2.21 MWD GMAG 94 6877.53 90.50 121.42 30.88 4443.37 465.75 2457.72 2670.26 3629.14 47.37 10.02 MWD GMAG 95 6909.80 90.26 121.06 32.27 4443.15 497.64 2440.99 2697.85 3638.24 47.86 1. 34 MWD GMAG 96 6940.05 90.57 118.38 30.25 4442.93 527.40 2425.99 2724.12 3647.77 48.31 8.92 MWD GMAG e 97 6971.84 90.02 120.46 31.79 4442.77 558.65 2410.38 2751.81 3658.19 48.78 6.77 MWD GMAG 98 7002.09 91. 29 119.49 30.25 4442.42 588.43 2395.26 2778.01 3668.05 49.23 5.28 MWD GMAG 99 7032.71 89.74 120.63 30.62 4442.15 618.59 2379.93 2804.51 3678.22 49.68 6.28 MWD GMAG 100 7064.12 89.37 119.22 31. 41 4442.39 649.52 2364.26 2831. 73 3688.96 50.14 4.64 MWD GMAG 101 7095.24 89.43 119.61 31.12 4442.72 680.10 2348.98 2858.84 3700.09 50.59 1.27 MWD GMAG 102 7127.33 90.09 120.48 32.09 4442.85 711.71 2332.91 2886.61 3711.47 51.06 3.40 MWD GMAG 103 7156.37 90.46 120.75 29.04 4442.71 740.36 2318.12 2911.61 3721.71 51. 47 1.58 MWD GMAG 104 7188.49 89.06 122.08 32.12 4442.85 772.12 2301.38 2939.02 3732.85 51.94 6.01 MWD GMAG 105 7219.01 88.78 121. 55 30.52 4443.42 802.32 2285.29 2964.95 3743.46 52.38 1. 96 MWD GMAG 106 7250.14 89.06 122.40 31.13 4444.01 833.14 2268.81 2991.35 3754.42 52.82 2.87 MWD GMAG 107 7282.07 88.75 121.85 31.93 4444.62 864.77 2251. 83 3018.38 3765.82 53.28 1. 98 MWD GMAG 108 7312.23 88.54 124.48 30.16 4445.33 894.70 2235.34 3043.62 3776.29 53.71 8.75 MWD GMAG 109 7343.68 88.72 121.62 31. 45 4446.09 925.91 2218.20 3069.97 3787.50 54.15 9.11 MWD GMAG 110 7373.72 88.75 123.81 30.04 4446.75 955.70 2201.97 3095.24 3798.57 54.57 7.29 MWD GMAG 111 7405.43 90.40 121.45 31.71 4446.98 987.14 2184.87 3121.94 3810.53 55.01 9.08 MWD GMAG e 112 7436.75 90.53 123.10 31. 32 4446.73 1018.17 2168.15 3148.42 3822.75 55.45 5.28 MWD GMAG 113 7468.41 90.57 121. 71 31. 66 4446.43 1049.55 2151.18 3175.15 3835.25 55.88 4.39 MWD GMAG 114 7499.57 89.95 122.55 31.16 4446.28 1080.42 2134.61 3201. 54 3847.91 56.31 3.35 MWD GMAG 115 7531.47 89.54 119.47 31.90 4446.43 1111. 92 2118.18 3228.87 3861. 64 56.73 9.74 MWD GMAG 116 7561.83 88.89 118.27 30.36 4446.84 1141.71 2103.52 3255.46 3875.92 57.13 4.49 MWD GMAG 117 7590.92 88.61 119.15 29.09 4447.48 1170.23 2089.55 3280.96 3889.85 57.51 3.17 MWD GMAG 118 7623.38 88.58 118.53 32.46 4448.27 1202.07 2073.90 3309.39 3905.52 57.93 1. 91 MWD GMAG 119 7652.38 89.02 116.24 29.00 4448.88 1230.36 2060.56 3335.13 3920.33 58.29 8.04 MWD GMAG 120 7683.48 89.09 116.61 31.10 4449.39 1260.58 2046.72 3362.98 3936.84 58.68 1.21 MWD GMAG SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 6 of 7 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 121 7714.85 88.47 116.22 31.37 4450.06 1291.07 2032.77 3391.07 3953.67 59.06 2.33 MWD GMAG 122 7745.61 88.44 116.39 30.76 4450.89 1320.94 2019.14 3418.63 3970.39 59.43 0.56 MWD GMAG 123 7774.09 87.68 116.91 28.48 4451. 86 1348.64 2006.38 3444.07 3985.87 59.78 3.23 MWD GMAG 124 7806.71 87.58 118.22 32.62 4453.20 1380.46 1991.30 3472.96 4003.34 60.17 4.02 MWD GMAG 125 7837.79 88.23 119.57 31.08 4454.34 1410.94 1976.29 3500.15 4019.55 60.55 4.82 MWD GMAG 126 7867.60 88.27 119.45 29.81 4455.25 1440.24 1961.61 3526.09 4035.00 60.91 0.42 MWD GMAG e 127 7898.39 88.37 116.56 30.79 4456.15 1470.34 1947.16 3553.26 4051.80 61. 28 9.39 MWD GMAG 128 7928.76 87.99 116.47 30.37 4457.12 1499.86 1933.61 3580.42 4069.18 61.63 1. 29 MWD GMAG 129 7959.52 88.20 116.29 30.76 4458.14 1529.74 1919.95 3607.96 4087.00 61.98 0.90 MWD GMAG 130 7990.53 87.85 116.56 31. 01 4459.21 1559.86 1906.16 3635.71 4105.10 62.33 1.43 MWD GMAG 131 8020.99 87.31 117.62 30.46 4460.50 1589.53 1892.30 3662.81 4122.74 62.68 3.90 MWD GMAG 132 8051.50 87.93 116.47 30.51 4461. 76 1619.23 1878.44 3689.96 4140.57 63.02 4.28 MWD GMAG 133 8082.17 88.20 118.70 30.67 4462.80 1649.17 1864.25 3717.12 4158.41 63.36 7.32 MWD GMAG 134 8112.99 87.96 120.34 30.82 4463.83 1679.45 1849.07 3743.93 4175.65 63.72 5.37 MWD GMAG 135 8143.89 87.65 120.51 30.90 4465.01 1709.90 1833.43 3770.55 4192.68 64.07 1.14 MWD GMAG 136 8173.86 87.00 122.75 29.97 4466.41 1739.52 1817.73 3796.04 4208.81 64.41 7.77 MWD GMAG 137 8205.63 87.17 125.08 31.77 4468.03 1771.07 1800.03 3822.37 4225.00 64.78 7.34 MWD GMAG 138 8235.82 86.82 125.40 30.19 4469.61 1801.11 1782.64 3846.99 4239.94 65.14 1.57 MWD GMAG 139 8266.75 86.65 126.22 30.93 4471.37 1831.91 1764.57 3872.03 4255.15 65.50 2.70 MWD GMAG 140 8297.62 87.00 129.37 30.87 4473.08 1862.70 1745.68 3896.39 4269.57 65.87 10.25 MWD GMAG 141 8328.73 87.10 129.44 31.11 4474.68 1893.77 1725.96 3920.39 4283.50 66.24 0.39 MWD GMAG e 142 8360.17 87.89 131. 46 31. 44 4476.06 1925.18 1705.58 3944.29 4297.26 66.62 6.89 MWD GMAG 143 8390.77 88.17 134.05 30.60 4477.11 1955.72 1684.82 3966.75 4309.72 66.99 8.51 MWD GMAG 144 8421. 23 88.13 133.80 30.46 4478.09 1986.09 1663.70 3988.67 4321.74 67.36 0.83 MWD GMAG 145 8452.92 89.19 135.82 31. 69 4478.84 2017.66 1641.38 4011.15 4333.99 67.75 7.20 MWD GMAG 146 8484.40 91.87 138.37 31. 48 4478.54 2048.90 1618.32 4032.58 4345.19 68.13 11.75 MWD GMAG 147 8515.24 92.14 139.39 30.84 4477.47 2079.35 1595.10 4052.84 4355.45 68.52 3.42 MWD GMAG 148 8546.65 92.76 139.43 31. 41 4476.12 2110.30 1571. 27 4073.26 4365.82 68.91 1. 98 MWD GMAG 149 8577.42 95.97 142.15 30.77 4473.78 2140.44 1547.51 4092.65 4375.45 69.29 13.66 MWD GMAG 150 8608.76 96.89 142.46 31. 34 4470.27 2170.86 1522.87 4111. 70 4384.65 69.68 3.10 MWD GMAG SCHLUMBERGER Survey Report 25-Apr-2004 10:07:03 Page 7 of 7 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 151 8640.22 95.00 145.32 31. 46 4467.01 2201. 23 1497.59 4130.13 4393.27 70.07 10.86 MWD GMAG 152 8671.29 93.62 145.93 31. 07 4464.68 2231.07 1472.02 4147.63 4401.09 70.46 4.85 MWD GMAG 153 8702.65 92.70 146.68 31. 36 4462.95 2261.12 1445.97 4165.00 4408.86 70.85 3.78 MWD GMAG 154 8734.01 93.31 148.37 31. 36 4461.30 2290.99 1419.55 4181.81 4416.18 71.25 5.72 MWD GMAG 155 8765.12 95.45 151.83 31.11 4458.93 2320.11 1392.66 4197.27 4422.28 71.64 13.05 MWD GMAG 156 8796.21 96.76 154.07 31. 09 4455.62 2348.57 1365.14 4211.33 4427.06 72.04 8.31 MWD GMAG e 157 8827.99 96.93 157.87 31.78 4451. 83 2376.94 1336.32 4224.18 4430.51 72.45 11.88 MWD GMAG 158 8860.31 96.96 160.73 32.32 4447.92 2404.91 1306.31 4235.52 4432.39 72.86 8.78 MWD GMAG 159 8890.83 96.41 163.65 30.52 4444.37 2430.56 1277.46 4244.79 4432.84 73.25 9.67 MWD GMAG 160 8922.36 95.59 165.07 31.53 4441.07 2456.45 1247.26 4253.24 4432.35 73.66 5.18 MWD GMAG 161 8954.40 94.93 168.79 32.04 4438.14 2481.95 1216.19 4260.45 4430.64 74.07 11.74 MWD GMAG 162 8983.77 94.65 173.09 29.37 4435.68 2504.05 1187.29 4265.06 4427.23 74.44 14.62 MWD GMAG 163 9014.46 94.03 174.23 30.69 4433.36 2526.19 1156.88 4268.44 4422.44 74.84 4.22 MWD GMAG 164 9046.55 92.07 177.20 32.09 4431.65 2548.56 1124.93 4270.83 4416.50 75.24 11.08 MWD GMAG 165 9076.61 95.51 176.43 30.06 4429.67 2569.08 1094.99 4272.50 4410.58 75.63 11.73 MWD GMAG 166 9109.05 98.76 175.95 32.44 4425.64 2591.36 1062.87 4274.64 4404.79 76.04 10.13 MWD GMAG 167 9140.76 99.26 175.43 31.71 4420.67 2613.24 1031.64 4276.99 4399.65 76.44 2.26 MWD GMAG 168 9233.69 99.42 176.43 92.93 4405.59 2677.02 940.18 4283.50 4385.46 77.62 1. 08 MWD GMAG 169 9326.06 99.54 175.60 92.37 4390.37 2740.29 849.29 4289.83 4373.09 78.80 0.90 MWD GMAG 170 9378.00 99.54 175.60 51. 94 4381. 77 2776.13 798.22 4293.76 4367.32 79.47 0.00 Projected To TD e e e Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason Well No L-201 L3 Date Dispatched: 27-Apr-04 I nsta lIation/Rig Nabors 9ES Dispatched By: N.Rose Data No Of Prints No of Floppies Surveys 2 Received By: ":1/ / /¡I, I'. /~- U~ 7 /'1~1 t O'(J~ Please sign and return to: Drilling & Measurements LWD Division 2525 Gambell Street, Suite 400 Anchorage, Alaska 99503 nrose1@slb.com Fax: 907-561-8417 LWD Log DeliveryV1.1, 10-02-03 Schlumberger Private R ò '"I - 0 '-{ 9 e e Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason Well No L-201 L3 PBl Date Dispatched: 12-Apr-04 Installation/Rig .1.1.1..1 Dispatched By: N. Rose 11.1 No Of Prints No of Floppies Surveys 2 Received By: JLv-J () IJ~ '/ r'\e-¡ Á~ V\ Please sign and return to: Drilling & Measurements LWD Division 2525 Gambell Street, Suite 400 Anchorage, Alaska 99503 nrosel@slb.com Fax: 907-561-8417 LWD Log DeliveryV1.1, 10-02-03 ;( a vi'- (jl{q Schlumberger Private t! ~- illJj . ~ Œ\ ~lA1 FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA. OIL Al'O) GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe L-201L3 BP Exploration (Alaska) Inc. Permit No: 204-049 Surface Location: 2598' NSL, 3588' WEL, SEe. 34, TI2N, RIlE, UM Bottomhole Location: 3090' NSL, 498' EWL, SEC. 35, Tl2N, RIlE, UM Dear Mr. Crane: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you fTom obtaining additional permits or approvals required by law fTom other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well PBU L-201, Permit Number 204-046, API Number 50-029-23202. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field ins ector a 9-3607 (pager). BY ORDER gF THE COMMISSION DATED thisL day of March, 2004 ee: Department ofFish & Game, Habitat Section w/o enel. Department of Environmental Conservation wlo enel. W4A- -sift 'U)(¡¥ o Drill a Redrill 1a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2598' NSL, 3588' WEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 5222' NSL, 1183' WEL, SEC. 34, T12N, R11E, UM (OA) Total Depth: 3090' NSL, 498' EWL, SEC. 35, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: X-583325 y-5978321 Zone-ASP4 16. Deviated Wells: Kickoff Depth C~sil'lgPr09r¡:¡m Size Casing 4-1/2" ALA& OIL AND ~Ä~T~g~SAi~~ON'OMM\~~TO~ PERMIT TO DRILL MAR 04 2004 20 MC 25.005 1b. Current Well Class 0 Exploratory a De~,~!9Pw!iJ,[ttOil 0 Multiple Zone o Stratigraphic Test 0 Service 0 Development Gas 0 Single Zone 5. Bond: IBI Blanket 0 Single Well 11. Well Name and Number: Bond No. 2S100302630-277 PBU L-201L3 6. Proposed Depth: 12. Field I Pool(s): MD 9668 TVD 4444 Prudhoe Bay Field I Orion 7. Property Designation: ADL ADL 02823a..C 1 "'7'f"~ 8. Land Use Permit: 13. Approximate Spud Date: March 13, 2004 9. Acres in Property: 2560 14. Distance to Nearest Property: 5400' 6183 ft 10. KB Elevation Planned 15. Distance to Nearest Well Within Pool (Height above GL): 78.7 feet L-119 is 350' away at top of OA 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle 97° Downhole: 2140 psig Surface: 1680 psig SettjngQèpth TOp ,,'Bottom Grade Coupling Length MD TVD MD TVD (including stage data) L-80 IBT 3729' 6170' 4456' 9668' 4444' Uncemented Slotted Liner Hole 6-3/4" Weight 12.6# 19. PRE$EN1"WELLCONDITION SùMMARY("fobeçornpletedfor R~rill AND Re-entry" Qper¡:¡tk)l')s) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD 13632 4763 None 13632 4763 Structural Conductor 80' Surface 3160' Intermediate 7062 Production Liner 6541' Liner (OBb) 5668' Liner (OBa) 5668' 48" 260 sx Arctic Set (Approx.) 109' 109' 10-3/4" 613 sx AS Lite, 360 sx Class 'G' 3189' 2639' 7-5/8" 578 sx Class 'G' 7091' 4686' 4-1/2" Uncemented Slotted Liner 7091' - 13632' 4686' - 4763' 4-1/2" Uncemented Slotted Liner 6513' - 13536' 4574' - 4657' 4-1/2" Uncemented Slotted Liner 6341' -13494' 4521' - 4636' 20. Attachments 0 Filing Fee, $100 0 BOP Sketch IBI Property Plat 0 Diverter Sketch perfOration Depth TVD (ft): IBI Drilling Program 0 Time vs Depth Plot o Seabed Report IBI Drilling Fluid Program o Shallow Hazard Analysis IBI 20 AAC 25.050 Requirements Date: Contact Michael Triolo, 564-5774 Perforation Depth MD (ft): 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Crane Title Senior Drilling Engineer Phone 564-4089 Date I See cover letter for other requirements DYes D No ~Yes D No Permit To Drill API Number: Number: .207'-(1 SIr 50- o~9- 2.32..0:2. - b..2. Conditions of Approval: Samples Required DYes D No Hydr n Sulfide Measures D Yes D No o £-35"0 p~¡' , Permit Date: Mud Log Directional Survey Required BY ORDER OF THE COMMISSION Date~Z: \ ~\Ll\ L · Well Plan Summary wter Prudhoe Bay L-201 ML Permit Suñace Location: 2,598' FSL, 3,588' FEL, Sec. 34, T12N, R11E (As-staked) X = 583,325.34 Y = 5,978,320.84 1._ _ ~_r_._ "'~ ..__.._"~"¥._~__ ~ __w_______ H_'____~____'~~.--~----.<~.~"':_~:_::":'.:~_~:::.~._________.._~_._____................__~.~..""-....____..,~ L-201 OBd Target Start: 4,813' FSL, 545' FEL, Sec. 34, T12N, R11 E X = 586,340.00 Y = 5,980,570.00 Z = 4,625' rvDss 1,562' FSL, 736' FEL, Sec. 35, T12N, R11E .. -rr~-= 5~~,470.00X::::.?.'.~Z7J~~P·()º_.~.,==_<1.!§!!4' TVDss 'r~m L-201 L 1 OBb Target Start: 5,067' FSL, 914' FEL, Sec. 34, T12N, R11 E X = 585,967.46 Y = 5,980,820.14 Z = 4,504' TVDss L-201 L 1 OBb Target End: 1,541' FSL, 696' FEL, Sec. 35, T12N, R11 E X = 591,510.00 Y = 5,977,360.00 Z = 4,578' TVDss L-201 L2 OBa Target Start: 4,823' FSL, 544' FEL, Sec. 34, T12N, R11 E X = 586,340.00 Y = 5,980,580.00 Z = 4,465' rvDss L-201 L2 OBa Target End: 1,550' FSL, 720' FEL, Sec. 35, T12N, R11 E X = 591,486.00 Y = 5,9771369.00 Z = 41557' TVDss 1.-.__.__ .H'_.," ',r ._.~__" ¡¡ ~ L-201 L3 OA Target Start: 5,222' FSL, 1,184' FEL, Sec. 34, T12N, R11 E X = 585,695.78 Y = 5,980,972.12 Z = 4,415' TVDss 3,090' FSL, 4,782' FEL, Sec. 35, T12N, R11E X = 587,405.00 Y = 5,978,860.00 Z = 4,150' TVDss I Type of Well (producer or injector): L-201 OBd Target End: L-201 L3 OA Target End: I AFE Number: I ORD5M3543 I Schrader OBd, OBb, OBa and OA Multilateral Producer I _ ~;~;:~::JJ.m::~ ·----·'11 i! KBE = 78.70' I Rig: I Nabors 9ES I Estimated Start Date: I March 13m 2004 I I Operating days to complete: 146.86 OBd MD 13,632' Well TVDrkb: TD 4,763' Max Inc. 93° KOP 300' OBb MD 13,536' Well TVDrkb: TD 4,657' Max Inc. 92° KOP 6,526' OBa MD 13,494' Well TVDrkb: TD 4,636' Max Inc. 93° KOP 6,354' OAMD 9,668' Well TVDrkb: TD 4,444' Max Inc. 97° KOP 6,183' Target Estimates: Estimated Reserves OA I OBa I OBb I OBd: Expected Initial Rate OA I OBa I OBb IOBd: Expected 12 Month avg OA I OBa I OBb I OBd: Current Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Original Well API #: L-201 L1 API OBb #: L-201 L2 API OBa #: L-201 L3 API OA #. Well Type: Current Status: H2S: Expected reserves 6.90 mmbbl Production rate: 4,950 bId Production rate: 2,300 bId 5,400' MD from top OA to PBU boundary (this is the closest point in the producing well section to any unit boundary) Top OA: 350' away from L -119 top OA TD: 2,270' away from L-210 50-029-XXXXX -00 50-029-XXXXX -60 50-029-XXXXX-61 50-029-XXXXX-62 Schrader O-sand Quadlateral Producer New well, 20" X 34" insulated conductor to be set o ppm from produced fluids (approximated to be around 10 ppm due to contaminated gas lift gas) Final Permit 3/4/04 <eer Prudhoe Bay L-201 ML Permit OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's OBd: 2,140 psi @ 4,600' rvDss (8.90 ppg EMW). Based on L-120 MDT's 84 of @ 4,400' rvDss (Estimated) . BHP: BHT: Mechanical Condition Conductor: Cellar Box Height: Nabor 9ES: 20" X 34", 215.51blft, A53 ERW set at 109' RKB Above MSL = 50.20' KB I MSL = 78.70' Materials Needed 3,190' 1 each 25 each 1 assembly 1 lot 1 each 10-%",45.5#, L-80 BTC Casing (Burst: 5,210; Collapse: 2,470) 10-%", BTC Float Shoe and Float Collar 10-%" x 13-~" Bow Spring Centralizers FMC 11" 5m Gen 5 Wellhead System 10-%" casing pups 5', 10', 20'. 1 0-%" TAM Port Collar 7,091' 1 each 75 each 20 each 2 lots 3 each 2 each 7-%" 29.7# L-80 BTC-M Casing (Burst: 6,890; Collapse: 4,790) 7-%" BTC-M Float Shoe and Float Collar 7-%" x 9-}'a" Rigid Straight Blade Centralizers 7-%" Stop Rings 7-%" casing pups 5',10',20' 7-%" RA Tag 7-%" 29.7# L-80 BTC-M Casing Short Joint 4 x Production Liners: 24,300 607 each 4 each 4 each 3 assemblies . "....---.<~, 4 ~", 12.6#, L-80, IBT-Mod Slotted Liner 4~" x 5 %" x 8" Straight Blade Centralizers 7-%" x 4-~" Baker ZXP Liner Top Packer 4-Y2" Halliburton Float Shoes Baker Level 3 Hookwall Hangers with LEM 6,150' 1 each 1 each 1 each 1 each 2 each 1 each 4 each 1 each 6,150' 3 each 1 each Surface and Anti-Collision Issues 4-Y2", 12.6Ib/ft, L-80, BTC-M tubing Baker PRM Production Packer 7-%" X 4-Y2" 11" X 4-~" FMC tubing hanger 4-1/16", 5m Cameron Tree Halliburton XN-Nipple (3.725" ID) Halliburton X-Nipple (3.813" ID) 4-~" Baker CMD Sliding Sleeve Camco 4-~" X 1" KBG-2 Gas Lift Mandrels Phoenix pressure gauge I-wire for the Phoenix gauge Half-muleshoed joint of 4-Y2" IBT-M tubing 4-~" WLEG ~urface Shut-in Wells: L-119 will need to be shut-in for the rig move on and off L-201. ~Iose Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile. 2 final Permit 3/4/04 . .ter Prudhoe Bay L-201 ML Permit CloserØ¡proach Well List: aw' ,~~~",~,..~....~ L-21 0 30.13-ft 249.39-ft 26.01-ft Use Traveling Cylinder (Gyro) L-120 47.06-ft 299.58-ft 42.05-ft Use Traveling Cylinder (Gyro) L-103 30.23-ft 449.73-ft 23.14-ft Use Traveling Cylinder (Gyro) L-119 17.33-ft 549.94-ft 8.43-ft Use Traveling Cylinder (Gyro) Mud Program 13-~" Suñace Hole Mud Properties: I Spud - Freshwater Mud Interval I Density (ppg) Funnel vis YP Tauo ~H Plastic Vis 0-1,700 8.6-9.2 250-300 50-70 10-18 8.5-9.0 20-45 1,700-2,500 9.0-9.5 200-250 30-45 8-16 8.5-9.0 20-40 2,500 - 3,190 9.3 - 9.5 200 30 - 40 9 -14 8.5 - 9.0 14 -20 Interval S cific Maintain Viscosity greater then 250 Ob' f pe . Ensure fluid loss below permafrost is below 6 $~V." l~te~~~;~~le Mu1d Properti~~~ 'M' "",.,..,~.w~.!,i~ta~n. ~~>tJ;:~:::~;~~~~~:~~; PH: 9~Ò': 9.5 Interval I Density (ppg) Funnel vis I YP I Tauo I PV I API Filtrate I MBT 9.0 - 9.3 45 - 55 26 - 30 3 - 6 12 - 18 4 - 6 < 20 Maintain proper fluid rheology & lubricant concentration to achieve the directional requirements Optimize mud rheology to maximize ROP while maintaining an ECD <0.7 ppg over calculated clean hole. Reduce shaker blinding while drilling the UGNU. 6-*" Production Hole Mud Properties: I LVT-2oo MOBM (Versa-Pro) Interval I Density (ppg) Stability I YP I Oil : H20 Ratio I PV I API Filtrate I MBT 9.2 650-900 18-25 80:20 15-20 4-5.5 <6 Minimize solids/liquid invasion by maintaining optimum PSD of bridging agents. Maintain minimal ECD's by reducing drill solids accumulation through utilization of the rigs solids control system and effective dilution. FL NC-8 8 5.5-8 Interval Specific Objectives: Interval Specific Objectives: Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Diverter, BOPE and drilling fluid system schematics are on file with the AOGCC. Production Section- · Maximum anticipated BHP: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Actual from L-120 MDT's · Maximum suñace pressure: 1,680 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: · Planned completion fluid: 3,500 psi (7-%" casing will be tested to 3,500 psi) Estimated 9.2 ppg Brine /6.8 ppg Diesel :,....[ø:a};' :. t! l~fði.Y~JliL ~~~~..~~. 5,000 psi Working Pressure 3,500/250 psi Rams & Valves (entire stack and valves 3,500/250 psi Annular Disposal · NO ANNULAR INJECTION ON THIS WELL. .. No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. 3 Final Permit 3/4/04 · _ter Prudhoe Bay L-201 ML Permit Formation Markers ~~-~~ SV4 Base Permafrost SV3 SV2 SV1 UG4 UG4A UG3 UG1 Ma Mb1 Mb2 Me Na Nb Ne OA OBa OBb OBc OBd TO (OBd) .' ~ > s: II I ~~JJIi ..._ J'" .ø~""'l:;r:tfij~1i1[.l" 1,475 1617 675 8.8 No 1,600 1766 730 8.8 No 1,680 1866 770 8.8 No 1,960 2245 890 8.7 Poss. Gas Hydr. 2,130 2509 960 8.7 Poss. Gas Hydr. 2,460 3031 1,120 8.8 Poss. Gas Hydr. 2,750 3490 1,255 8.8 Yes - Heavy Oil 2,785 3546 1,270 8.8 Yes - Heavy Oil 3,150 4123 1,420 8.7 Yes - Heavy Oil 3,500 4672 1,600 8.8 Yes - Heavy Oil 3,960 5379 1,820 8.8 Yes - Heavy Oil 4,000 5444 1,825 8.8 No - Wtr 4,080 5578 1,830 8.6 No - Wtr 4,155 5710 1,845 8.5 No - Wtr 4,200 5793 4,230 5850 1,890 8.6 No - Wtr 4,275 5940 4,370 6151 1,970 8.7 Yes 4,440 6226 2,000 8.7 Yes 4,490 6494 2,060 8.8 Yes 4,545 6734 2,110 8.9 Yes 4,600 7051 2,140 8.9 Yes 4,684 13,632 2,168 8.9 Yes CasinglTubing Program 48" 20" X 34" 215.5# A53 Welded 80' 29' 129' 109'/109' 13-~" 10-%" 45.5# L-80 STC 3,160' 29' 129' 3,189' 12,639' 9-%" 7-%" 29.7# L-80 STC-M 7,062' 29' 129' 7,091'/4,686' 6-%" OSd 4-~" slotted 12.6# L-80 1ST 6,541' 7,091' 14,686' 13,632' 14,763' 6_3..4" OSb 4-~" slotted 12.6# L-80 1ST 5,668' 6,513' 14,574' 13,536' 1 4,657' 6-%" OSa 4-~" slotted 12.6# L-80 1ST 5,668' 6,341' 1 4,521 ' 13,494' 14,636' 6-%" OA 4-~" slotted 12.6# L-80 1ST 3,729' 6,170' 1 4,456' 9,668' 1 4,444' Tubing 4-~" 12.6# L-80 IST-M 6,121' 29' 129' 6,150' 1 4,454' Cement Calculations Casing Size 110-% -in 45.5-lblft L-80 STC surface casing Basis 250% excess in permafrost. 30% excess below permafrost. Top of tail cement 800' MD above shoe Total Cement Vol: Wash 20-bbl CW Spacer Spacer 70-bbI10.1-lb/gal MudPush spacer Lead 468-bbl, 613-sx 10.7-lb/gal ASL - 4.28 ft~/sx (cement to suñaee) Tail 75-bbl, 360-sx 15.8-lb/gal Premium G - 1.17 ft~/sx ""~_':"Æ~~'~"'!~'>i<-jt~~.fe"2!~,!,~",~~.:,.~!".~_~~.~~,,,~~,*~',;I~'·"~"";:;:;JS;W,;;;;)!I"_~~~'."~,w._~%~<¡_'0;i>!"_,,,£>~,,,:~~,",.#,_,,;c'N¡£..'#'~''Ä.~M:,,~.::'~::~f./'~'''¡i::.=:=-~w'1:ø_>;!W:<r:t'''.W~~~_: Temp I SHST == 55°F from SOR, SHCT 60°F estimated by Dowell In the event that cement is not circulated to suñace during the initial suñace casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to suñace. 4 Final Permit 3/4/04 · .er Prudhoe Bay L-201 ML Permit Casing Size 17-% -in 29.7-lblft L-80 BTC-M intermediate casing Basis Top of tail cement 700-ft MD above top of Schrader Ma-sand. 30% excess over gauge. Total Cement Vol: Wash 25-bbl Water Spacer 45-bbI10.3-lb/gal MudPush Spacer Tail 124 bbl, 578-sx 15.8-lb/gal Premium -1.20 ft;1/SX __"._ ~0.f..?f ~~~.!!~-I?L!~£~~: 5,~~~' MD_'"M''' Temp BHST = 120°F from SOR, BHCT 90°F estimated by Halliburton : Wf on _I'-^- 1Q-3A" Casing Centralizer Placement a) Run (25) 9-%" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 2,189' MD (1,00' MD above the shoe). b) This centralizer program is subject to change pending actual hole conditions. 7-o/a" Casing Space Out a) Space 7-%" casing out with pups and long/short jOints as required to place the top of a long full joint - 5- 15' above the top of the OBb, OBa and OA sands to allow for the window to be milled just below the top of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance reservoir contact depending on the angle of intersection of each zone. b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth except on the OBd lateral. It will need to be placed 120' above the casing shoe. c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out. 7-o/a" String Centralizer Placement a) Centralizer size: 7-%" X 9-%" (this is different then the norm of W under gauge hole) b) Do not run centralizers on the window joints spaced at the top of each sand. c) Place 2 rigid straight blade centralizers back to back at the very bottom of the shoe joint. Do not run any centralizers on the next two full joints. d) With the exception stated above, alternate 1 rigid straight vane cenralizer floating across a full joint and 2 rigid straight vane centralizers, one floating on the upper half of the joint and one floating on the lower half of the joint separated by a stop collar up to ±5,830' MD (320' MD above the top OA sand). Then continue with 1 rigid straight vane centralizer per joint floating to 4,600' MD (780' MD above Ma sand). Zonal isolation with cement is required between the OA and the Nb sands due to the presence of water in the Nb sand. The centralizer program is subject to change pending modeling and hole conditions. 4 "'h" Solid Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop collar. Do not put any centralization on the first two joints above the bent joint. Survey and Logging Program 13-"'h" Hole Section: Surface Gyro if needed (have discussion with ODE on photo or E-line Gyro) Open Hole Drilling: MWD I GR Cased hole: None ·~---··~tYSJ ~ ¡~*~~¥'t¡--"*,*,'.~~~~~~;~~>!!o:-~,~r1&:t¡;¡x~¡¡~ J!19IJl9 m'~~ $~~~'AA'!#.?lm.¡.ì$ Ii nJ "< i?'< ¡¡::i~ã'(}~ 9-%" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only) Open Hole: None _10' 1 ~~~,~d ,~o~;~~,,~,~~ ~W~~~"¡~~ii~,~~l'~~Jj~,~~t~~i~~~~!~~~~~"'~__".,, ""~ 6-~" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (Den/Neu recorded only) I AIM I PWD Cased Hole: None 5 Final Permit 3/4/04 · Wer Prudhoe Bay L-201 ML Permit Drillina Hazards and Continaencies POST THIS NOTICE IN THE DOGHOUSE J. Well Control A. The Schrader in this fault block is expected to be underpressured based on the MDT samples. a. OA: 1,970 psi @ 4,370' TVDss (8.70 ppg EMW). Based on L-120 MDT's b. OBa: 2,000 psi @ 4,440' TVDss (8.70 ppg EMW). Based on L-120 MDT's c. OBb: 2,060 psi @ 4,490' TVDss (8.80 ppg EMW). Based on L-120 MDT's d. OBd: 2,140 psi @ 4,600' TVDss (8.90 ppg EMW). Based on L-120 MDT's II. Hydrates and Shallow gas A. Gas hydrates are present below L-pad, but have not been a significant issue thus far during L-Pad drilling. If hydrates are encountered follow the recommended practice and apply good drilling operational practices. III. Lost Circulation/Breathing A. lost circulation is unlikely within the Schrader interval. B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee. IV. Kick Tolerancellntegrity Testing A. The 10-%" casing will be cemented to surface. B. The 7_%" casing will be cemented with 15.81b/gal tail cement to 700' MD above the Ma sand -4,680' MD. C. The Kick Tolerance for the surface casing is 52.7 bbls with 9.2 ppg mud, 11.4 ppg lOT, and an 8.9 ppg pore pressure (most likely 8.9 ppg based on recent MDT's within the block). If the LOT is less then 11.4 ppg EMW, then the kick tolerance will be < 50 bbls. D. The Kick Tolerance for the production hole laterals is infinite with 9.2 ppg mud, 12.0 ppg FIT, and an 8.9 ppg pore pressure. If the FIT is less then 12.0 ppg EMW notify the ODE to have conversation on how to deal with potential ECD concerns around the casing exit points. E. Integrity Testing V. 10-%-in Window 7-%-in Shoe 7-% -in Window 7-% -in Window 7-% -in Window ¡'.T W-~l.IIiwT ~_,~~~_~ ~_o .-, ' -.. 20-ft min new formation below shoe 20-ft min new formation below shoe 20-ft minimum from top window 20-ft minimum from top window 20-ft minimum from top window .*~~.~~ LOT 11.4 minimum FIT 12.0 minimum FIT 12.0 minimum FIT 12.0 minimum FIT 12.0 minimum Stuck Pipe A. We do not expect stuck pipe. B. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners moving as much as possible and run one centralizer per joint to help with standoff. VI. Hydrogen Sulfide A. l-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. Recently 10 ppm of H2S has been measured at L-Pad from all wells tested as recently as January 2003 with hand held H2S meters. This is as a result of H2S being transmitted by shared gas lift gas and not produced from L-Pad. There has been no seawater injection at l-Pad to date. VII. Faults There are four visible faults to cross while drilling the well. It is possible to encounter sub-seismic faults along the proposed well path. In the production hole sections, if a fault throws us out of section steer up as fast as possible to determine where we are within the section. This will make it easy to lowside OH sidetrack to get back on course. Fault #1 : Fault #2 SV6 UG1 1,090' MD 5,190' MD 1,000' TVDss 3,840' TVDss 80' West throw 40' Southwest throw CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 Final Permit 3/4/04 · .ter Prudhoe Bay L-201 ML Permit Drill and Complete Procedure Summary Pre-Rie Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. Drillina Ria Operations: 1. MIRU Nabors 9ES Nipple up diverter spool and riser. Function test diverter. PU 4,200' of 5" DP as required and stand back in derrick (this will enable both holes to be drilled without changing the DP handling equipment in open hole). 2. MU 13-¥.z" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,189' MD 12,639' TVD. The actual surface hole TD will be +1-100' TVD below the top of the SV1 sand. 3. Run and cement the 10-%",45.5# L-80 surface casing back to surface. Will use TAM collar as contingency only. ND drilling spool and riser and NU casing 1 tubing head. NU BOPE and test to 3,500 psi. 4. MU 9-%" directional drilling assembly with MWD/GRlReslDen/NeuIPWD and a Weatherford Drill-Mill at ±BOO' from the bit in the HWDP section and RIH PU 4" DP to float collar. Test the 10-%" casing to 3,500 psi for 30 minutes. 5. Drill out shoe track. Circulate and condition mud. Displace well to new LSND drilling fluid. Drill 20' of new formation below rathole and perform a LOT. Directionally drill ahead to TD (Topset the OBd) as per directional profile to 7,091' MD 14,686' TVD. 6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TD. Make sure hole is clean prior to POOH. POOH laying down the 5" DP and standing back the 4" DP, LD drilling BHA. Retrieve bowl protector. 7. MU and run 7-%" 29.7# L-80 BTC-M long string casing to TD. Cement in one stage to 700' MD above the Schrader Ma sand. Bump plug with seawater. Land casing on mandrel hanger. 8. Clean pits for displacement. Freeze protect 7-%" x 10-%" annulus with dead crude to 2,200' TVD. 9. PU 6-%" Powerdrive RSS or conventional assembly with MWD/GRlResl Azimuthal Den INeulPWD and RIH to the float collar picking up 4" DP on the way. Test the 7-%" casing to 3,500 psi for 30 minutes. 10. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation below rathole and perform an FIT to 12.0 ppg EMW. Directionally drill ahead to TD geosteering through the OBd to TD at 13,632' MD 14,763' TVD (prognosed). Perform wiper trip, circulate and condition mud. 11. POOH to near OBb window depth, log into top OBb and OBb RA marker with GR, log across the OBa and OA windows as well. POH LD drilling assembly. 12. MU and run 4-¥.z" 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TD. Position liner top packer 100' below OBb window. 13. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is near the top of the OBb sand (planned window exit: 6,501' MD). Orient whipstock to highside. Shear off Whipstock & mill window. Perform FIT to 12 ppg EMW. POOH 14. RIH with 6-%" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded I Neu recorded 1 AIM) to whipstock. Directionally drill to 6-%" TD. Planned TD is 13,536' MD. Circulate and condition mud and perform wiper trip. POOH. 15. Pull whipstock #1. Run and set 4-¥.z" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, circulate and condition mud, POOH 16. PU the 7-%" whipstock assembly. Set the whipsock on the OBb liner top packer such that the top of the window is near the top of the OBa sand (planned window exit: 6,329' MD). Orient whipstock to highside. Shear off of Whipstock and mill window. Perform FIT to 12 ppg EMW. POOH 17. RIH with 6-%" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded I Neu recorded 1 AIM) to whipstock. Directionally drill to 6-%" TD. Planned TD is 13,494' MD. Circulate and condition mud and perform wiper trip. POOH. 18. Pull whipstock #2. Run 4-¥.z" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 19. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is near the top of the OA sand (planned window exit: 6,158' MD). Orient whipstock to highside. Shear off of Whipstock and mill window. Perform FIT to 12 ppg EMW. POOH 20. RIH with 6-%" drilling assembly (with MWD 1 GR I Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock. Directionally drill to 6-%" TÆ: Planned TD is 9,668' MD. Circulate and condition mud and perform wiper trip. POOH. .1. Pull whipstock #/.. $R~~-~" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Éntry Module #2 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL brine. POOH. 7 Final Permit 3/4/04 · .er Prudhoe Bay L-201 ML Permit 22. MU 4-~" 12.6# BTM-M, l-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus. 23. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK-1 valve. 24. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 25. Pull two-way check. Freeze protect the well to 2,200' TVD. Install VR plug in 7-%" casing annulus valves. 26. Install BPV. Secure the well and rig down 1 move off Nabors-9ES. 8 Final Permit 3/4/04 POST RIG - COMPLEIN L-201, L 1, L2, & L3 . ~ TREE: FMC 4-1/16" SM WELLHEAD: FMC Gen S System 11", SM csg.head wI?" mandrel hanger & packoff 11" x 11", SM, tbg spool wI H To 11" x 4-1/2" tubing hanger with control line ports §.ì -, . ' 11" X 4-1/16" Adaptor Flange ~ 20" X 34" 215.51b1f1, A53 ERW 1"~lated ~¡ ., Halliburton X-Nipple (3.813"ID) 12,200' TVD I 1 !!ii> - Camco 4-112" xi" KBG-2 GLM's I Orig KB elev (N-9ES) = 28.5' I ~:i,~i:-- 109' .- Junction Specifications: Junction 10 through lEM Module without diverter: 3.65" ....10"3/4", 45.5# L-80 STC Csg @ 3,19T MD Phoenix Pressure Gauge with control lines to surface -5/8" X 5-1/2" Baker PRM Packer 4-1/2", 12.6Ib/ft, l-80, BTC-M Coupling 00: 5.2" OriftllO: 3.833"/3.958" 4.5" Baker sliding sleeve with 3.813"ID 4.5" WLEG 1 6,128' MD 1 9.2 PPG Versapro MOBM below Completion 6-3/4" OAlateral 16,158'-9,668' I .,'.,.,........'-.-....'-.,.,....-..-'-..-'-'-..-.-....,','",-",','," ....<.':iIIIiI·::::~::.:::'~:>'::.::~:><~-.-:.~:::::::~·:--,~::-:::".::-;.....:::::::~ .._:.-:...:-_::...::::.:~'::::::::tIIIIII',::::::tIIIII-:)~-.-..:~:,:-::~- :::,:....:,:::~.:::::~- 7-5/8",29.7#, l-80, BTC-M Casing Drift: 6.75" Casing '0: 6.875" 6-3/4" OBa lateral 16,329'-13,494'1 - - - - _.- _. -.. - - - - - -ii : :"':' ....::_...::-...:- :_-:....-')...:......."::-.....-:-:_.....-:-::...?...':...::.:-::~::::.- -, - ., Baker Hughes Hookwall Hanger @ 6,148' MD Window in 7-5/8" casing@ 6,158' MD Well Inclination @ Window = 660 Baker Hughes Hookwall Hanger @ 6,319' MD Window in 7-5/8" casing@ 6,329' MD Well Inclination @ Window = 700 Baker Hughes Hookwall Hanger @ 6,491' MD Window in 7-5/8" casing@ 6,501' MD Well Inclination @ Window = 740 6-3/4" OBb Lateral 16,501 '-13,536'1 . !i. :·~..-.-:iIiII<:,-,-,~:::>}III··:::··~ ." - - ..¡,..- -..... . 7-5/8" Casing Shoe @ 7,091' MD \I 6-3/4" OBd lateral 17,091'- 13,6321 DATE REV. BY COMMENTS G:ER Ii. .D-.:LL 'tlJ'lil.ff..1Jl/lHÓ/N. 31412004 MIK TRIOLO level 3 Multi-lateral, 4-1/2" Gl Completion ORION WELL: L-201 ML API NO: 50-o29-xxxxx-GO 50-G29-xxxxx-60 SO-o29-xxxxx-61 SO-G29-xxxxx-62 . . I - III¡¡ ~ I PLANT ) IS'OO'OO' GRID L -PAD 33,' / ^~3~ L-PAD ,. PROJECT " '. AREA -' If§. ,I. ~';""', " . N-L (NWE-1) 4 T12N T11N w ct: " i L-111i . · N-A (NWE-2) · L-113 L-114. L-$O · · L-112i · L-02 L-121 · · L-122 L-110 · L-SI · · L-115i L-116 . · L-117 L-109 . · L-118 L-SL · ., " .' , /:i,.:~, :);~,' ;;/"<.:,....'. ; ;~'}'.'/ "".' VICINITY MAP N.T.S. 2 LEGEND -+- AS-BUILT CONDUCTOR . EXISTING CONDUCTOR L-108i. L-105i. L-106 . L-104 . s-w . L-102 . ~ :1 · L-103i L-201t L-119i L-210' L-120 L-01 . L-107 . ~~ //.'J 0' / / /> _.~,,- ~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGIS1ERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STA1E OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF DECEMBER 18, 2003, r:x:oM.~ ~'Q~~ ...._..~~...~...,' NOTES I 1. DA1E OF SURVEY: DECEMBER 18. 2003. 2. REFERENCE FIELD BOOK: WOO3-14 PAGES 37-38. 3. ALASKA STA1E PLANE COORDINA1ES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. BASIS OF HORIZONTAL LOCATION IS L-PAD OPERATOR MONUMENT A TION. 5. BASIS OF ELEVATION IS L-PAD OPERATOR MONUMENTS. ELEVATIONS ARE BP MSL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. œ i ~ j LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS L-201 y= 5,978,320.84 N= 10.000.09 70"21'02.654" 70.3507372" 502' 2,598' FSL X= 583,325.34 E= 5.340.15 -14919'24.511" -149.3234753" . 3,588' FEL L-21Oi Y= 5,978,328.65 N= 10,000.14 70"21'02.727" 70.3507575" 50.8' 2,605' FSL X= 583.354.28 E= 5,370.13 -14919'23.663" -149.3232397" 3.559' FEL .. ! ~ > ~ i!I ~ ~o:~, ORA..,; ObP JACOBS CHECKED: O'HANLEY DAlE, 12/19/03 DRA'MNC: GPB WOA L -P AD SHEET: FRB03 WOl 02-00 ~ ffi~~(IJ(~o JOB NO: SCALE: AS-BUILT CONDUCTORS OIOINŒIISMOLMD~ 1 Of 1 J./ LOll _ 1IØT nIIÞUD I.-c I". 130' WELLS L-201 & L-21Oi BY otK -- ..... ...., " o . .. ~ ~ I ~ ! > i 0 12/111/03 ISSUED f"CR 1Nf"QRIIAlION ;S NO. DA1£ RE\1SION L-201 L3 (P5) Proposal S umberger Report Date: January 29, 2004 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: 8P Exploration Alaska Vertical Section Azimuth: 130.000' Field: Prudhoe Bay Unit - WOA W04 Vertical Section Origin: N 0.000 II. E 0.000 ft Structure I Slot: L-PAD / N-U ) TVD Reference Datum: Rotary Table Well: Plan L-201 (N-U) ¥ed 03/0 TVD Reference Elevation: 78.70 ft relative to MSL Borehole: Plan L·201 L3 OA APpro Sea Bed / Ground Level Elevation: 50,20 ft relative to MSL UWI/API#: 50029 Magnetic Declination: 25.012' Survey Name I Date: L·201 L3 (P5) OA / January 29, 2004 Total Field Strength: 57560.460 nT . Tort / AHD / DDI/ ERD retio: 253.254'/7305.18 ft/6.598/1.620 Magnetic Dip: 80.823' Grid Coordinate Syatem: NAD27 Alaska State Planes. Zone 04, US Feet Declination Date: April 02, 2004 Location Lat/long: N 70.35073717, W 149.32347531 Magnetic Declination Model: 8GGM 2003 Location Grid N/E YIX: N 5978320.840 ftUS. E 583325,340 flUS North Reference: True North Grid Convergence Angle: ..0.63713312' Total Corr Mag North -> True North: +25.012' Grid Scale Factor: 0.99990789 Local Coordlnatea Referenced To: Well Head Comments I Measured I Inclination I Azimuth I TVD I Sub·S.a TVD I Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Tool Face I Northing Easting Latitude Longltud. Depth Section Departure (ft) (dog) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (dog/100ft) (dog/100ft) (dog/100ft) (dog ) (ftUS) (ftUS) Top Whipstock 6158.00 65.64 103.43 4451.61 4372.91 -250.27 3808.64 2776.58 2003.12 4.00 2.25 3.65 30.00G 5981119.25 585297.27 N 70.35832178 W 149.30720778 Base Whipstock 6170.00 67.31 104.47 4456.40 4377.70 -240.39 3819.64 2773.92 2013.79 16.00 13.89 8.67 O.OOG 5981116.72 585307.98 N 70.35831452 W 149.30712107 KOP Cry 10/100 6183.00 67.31 104.47 4461.41 4382.71 -229.56 3831.63 2770.93 2025.41 0.00 0.00 0.00 20.66G 5981113.85 585319.62 N 70.35830633 W 149.30702677 6200.00 68.90 105.11 4467.75 4389.05 -215.29 3847.41 2766.90 2040.66 10.00 9.36 3.78 20.42G 5981110.00 585334.92 N 70.35829532 W 149.30690292 6300.00 78.31 108.66 4495.95 4417.25 -127.15 3943.23 2739.01 2132.32 10.00 9.41 3.55 19.41G 5981083.13 585426.87 N 70.35821905 W 149.30615862 6400.00 87.75 111.97 4508.08 4429.38 -33.80 4042.38 2704.57 2225.28 10.00 9.45 3.31 19.01G 5981049.73 585520.20 N 70.35812488 W 149.30540377 90' PI 6423.80 90.00 112.74 4508.54 4429.84 -11.13 4066.17 2695.52 2247.28 10.00 9.46 3.26 18.99G 5981040.92 585542.30 N 70.35810014 W 149.30522509 End Cry 6491.18 96.37 114.95 4504.80 4426.10 53.45 4133.42 2668.34 2308.78 10.00 9.45 3.27 O.OOG 5981014.43 585604.09 N 70.35802585 W 149.30472571 Cry 10/100 6561.67 96.37 114.95 4496.97 4418.27 121.11 4203.47 2638.79 2372.30 0.00 0.00 0.00 102.33G 5980985.60 585667.93 N 70.35794508 W 149.30420993 Tgt 2 OA / Cry 6/100 6592.79 95.70 118.00 4493.70 4415.00 151.19 4234.42 2625.00 2400.00 10.00 -2.16 9.82 102.06G 5980972.12 585695.78 N 70.35790737 W 149.30398504 6600.00 95.61 118.43 4492.99 4414.29 158.21 4241.59 2621.61 2406.32 6.00 -1.26 5.90 102.11G 5980968.80 585702.14 N 70.35789810 W 149.30393371 End Cry 6663.34 94.80 122.15 4487.24 4408.54 220.38 4304.67 2589.80 2460.78 6.00 -1.28 5.89 O.OOG 5980937.59 585756.94 N 70.35781115 W 149.30349154 . Cry 6/100 7022.23 94.80 122.15 4457.20 4378.50 574.66 4662.30 2399.47 2763.56 0.00 0.00 0.00 -162.49G 5980750.66 586061.79 N 70.35729089 W 149.30103329 7100.00 90.35 120.75 4453.71 4375.01 651.47 4739.97 2358.94 2829.82 6.00 -5.72 -1.80 -162.55G 5980710.88 586128.49 N 70.35718011 W 149.30049536 L-201 L3 Tgt 3 OA 7101.75 90.25 120.72 4453.70 4375.00 653.19 4741.72 2358.05 2831.32 6.00 -5.72 -1.80 -127.10G 5980710.00 586130.00 N 70.35717767 W 149.30048314 End Cry 7101.85 90.25 120.72 4453.70 4375.00 653.29 4741.82 2358.00 2831.41 6.00 -3.62 -4.79 O.OOG 5980709.95 586130.09 N 70.35717753 W 149.30048244 Cry 6/100 8129.44 90.25 120.72 4449.28 4370.58 1667.41 5769.40 1833.14 3714.83 0.00 0.00 0.00 89.96G 5980195.00 587019.21 N 70.35574262 W 149.29331058 8200.00 90.25 124.95 4448.98 4370.28 1737.40 5839.96 1794.89 3774.11 6.00 0.00 6.00 89.98G 5980157.41 587078.90 N 70.35563804 W 149.29282939 L-201 L3 Tgt 4 OA 8263.35 90.25 128.75 4448.70 4370.00 1800.64 5903.31 1756.91 3824.79 6.00 0.00 6.00 68.18G 5980120.00 587130.00 N 70.35553420 W 149.29241801 8300.00 91.07 130.79 4448.28 4369.58 1837.29 5939.96 1733.46 3852.96 6.00 2.23 5.57 68.20G 5980096.87 587158.42 N 70.35547012 W 149.29218939 8400.00 93.29 136.37 4444.48 4365.78 1936.98 6039.88 1664.61 3925.31 6.00 2.22 5.58 68.42G 5980028.83 587231.53 N 70.35528191 W 149.29160214 8500.00 95.47 141.97 4436.83 4358.13 2035.36 6139.58 1589.20 3990.48 6.00 2.19 5.60 68.84G 5979954.16 587297.53 N 70.35507581 W 149.29107336 End Cry 8593.62 97.48 147.26 4426.27 4347.57 2125.34 6232.60 1513.40 4044.33 6.00 2.14 5.64 O.OOG 5979878.97 587352.21 N 70.35486865 W 149.29063643 Cry 6/100 8594.02 97.48 147.26 4426.22 4347.52 2125.72 6233.00 1513.06 4044.54 0.00 0.00 0.00 117.14G 5979878.64 587352.43 N 70.35486773 W 149.29063468 8600.00 97.31 147.58 4425.45 4346.75 2131.38 6238.93 1508.07 4047.74 6.00 -2.74 5.38 117.18G 5979873.68 587355.68 N 70.35485408 W 149.29060878 8700.00 94.54 152.93 4415.11 4336.41 2224.65 6338.38 1421.74 4097.05 6.00 -2.77 5.35 117.73G 5979787.92 587405.95 N 70.35461817 W 149.29020873 8800.00 91.74 158.24 4409.63 4330.93 2314.66 6438.22 1330.86 4138.30 6.00 -2.81 5.31 118.02G 5979697.51 587448.19 N 70.35436983 W 149.28987424 L-201 L3 Tgt 5 OA 8861.52 90.00 161.50 4408.70 4330.00 2367.99 6500.05 1273.11 4159.46 6.00 -2.82 5.30 96.30G 5979640.00 587470.00 N 70.35421203 W 149.28970265 8900.00 89.75 163.79 4408.79 4330.09 2400.39 6538.53 1236.39 4170.94 6.00 -0.66 5.96 96.29G 5979603.41 587481.88 N 70.35411169 W 149.28960964 Well Design Ver 3.1RT-SP3.03-HF2.03 Bld( d031rt-546) N-UIPlan L-201 {N-U)IPlan L-201L3 OAIL-201L3 (P5) OA Generated 3/4/2004 9:00 AM Page 1 of 2 Comments Measured I Inclination I Azimuth I TVD I Sub-Sea TVD I Vertical I Along HOle' NS EW , DLS I Build Rate I Walk Rate , Tool Face I Northing Ea.Ung Latitude Longitude Depth Section Departure (ft) (dog ) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (dog/100ft) (dog/100ft) (dogl1ooft) (dog ) (ftUS) (ftUS) 9000.00 89.09 169.76 4409.80 4331.10 2480.45 6638.52 1139.09 4193.80 6.00 -0.66 5.96 96.23G 5979506.38 587505.82 N 70.35384585 W 149.28942445 9100.00 88.45 175.73 4411.95 4333.25 2553.84 6738.50 1039.96 4206.43 6.00 -0.65 5.97 96.10G 5979407.41 587519.55 N 70.35357501 W 149.28932240 9200.00 87.82 181.70 4415.21 4336.51 2619.76 6838.44 940.08 4208.68 6.00 -0.63 5.97 95.91G 5979307.57 587522.91 N 70.35330216 W 149.28930460 9300.00 87.21 187.67 4419.55 4340.85 2677.49 6938.35 840.56 4200.52 6.00 -0.60 5.98 95.65G 5979207.97 587515.86 N 70.35303027 W 149.28937124 9400.00 86.64 193.65 4424.92 4346.22 2726.39 7038.20 742.47 4182.06 6.00 -0.57 5.98 95.33G 5979109.69 587498.49 N 70.35276233 W 149.28952160 9500.00 86.10 199.64 4431.25 4352.55 2765.94 7138.00 646.90 4153.48 6.00 -0.54 5.99 94.95G 5979013.82 587470.98 N 70.35250128 W 149.28975401 9600.00 85.61 205.64 4438.49 4359.79 2795.69 7237.75 554.88 4115.11 6.00 -0.50 6.00 94.52G 5978921.39 587433.64 N 70.35224997 W 149.29006594 End Crv 9600.24 85.60 205.65 4438.51 4359.81 2795.75 7237.98 554.67 4115.01 6.00 -0.47 6.00 O.OOG 5978921.18 587433.54 N 70.35224939 W 149.29006677 TD / 4-1/2" Lnr 9667.95 85.60 205.65 4443.70 4365.00 2812.48 7305.49 493.81 4085.79 0.00 0.00 0.00 O.OOG 5978860.00 587405.00 N 70.35208316 W 149.29030431 e LeQal Description: NorthlnQ (Y) [ftUSl Eastlnq (X) [ftUSl Surface 2597 FSL 3588 FEL S34 T12N R11E UM 5978320.64 583325.34 Tgt 2 OA 5222 FSL 1184 FELS34 T12N R11E UM 5980972.12 585695.78 L-201 L3 Tgt 3 OA 4955 FSL 753 FEL S34 T12N R11E UM 5980710.00 586130.00 L-201 L3 Tgt 4 OA 4353 FSL 5040 FEL S35 T12N R11E UM 5980120.00 587130.00 L-201 L3 Tgt 5 OA 3869 FSL 4707 FEL 535 T12N R11E UM 5979640.00 587470.00 TO / BHL 3090 FSL 4782 FEL S35 T12N R11E UM 5978860.00 587405.00 . Well Design Ver 3.1RT-SP3.03-HF2.03 Bld( d031rt-546) N-UIPlan L-201 (N-U)IPlan L-201 L3 OAIL-201 L3 (P5) OA Generated 3/4/2004 9:00 AM Page 2 of 2 g o o o ,... ~ ,... II ( ) TI (/) CI ¡::: Schlumb8rU8r WEll FIELD Prudhoe Bay Unit - WOA STRUCTURE L-PAD L-201 L3 (P5) Magnetic Pamm8leB Modal: 800M 2003 Surfaoelocation Lat: N702t2.8M Lon: W1491924.511 TVDRet: RotaryT8bI8(78.70ftaboveMSl) SrvyDate: Januery29,2004 NAD27 Alaska State Planes, Zone 04, US Feet Northing: 5918320.84ftUS GridConv: +0.63713312' Eastlng: 563325.34 flUS Scale Fad.: 0.9999078872 MI&eellaneous Slot; N-U Plan: L-201L3(P5)OA Dip: 80.823' MagDac: +25.012' Date: "¢I 02, 2004 FS: 57560.5nT . -1000 o 1000 2000 3000 4000 5000 6000 7000 4000 '-201 (P5b) OBd : ·1-·· jéff·····" ......... ...¡...... ...... .... ... -..... -r-...' .......... .00...... ·-r····· '_00.... ......... ·T····· '.00_....' .'..'..".r-'..'.' '.00...." ....... .'t........ .00.......00..... .¡-.-........ ......... ...-... r :.:t:::::: ···.::::::f;:~~~ ;:::·~~¡~;;:::::;::::::·::::::::hW:::::::::::::::::T~:k:;¡'::¡:òf::::::::::::::J::::::::::::::::::::::::::::h::::::::::::::::::::.:::::::k::.::::::::::::::::::::::;;~:::::::::::::.::::::::::::::1:: 4000 ..;........ 1 ........... '1~s¡,.U-%tx.6IJ~..!'USU.Q^-...oo.:~.1!-J..CJl.L'l.oo....~.-¿t:.".".OO.'..............¡.........._...oo....oo_oo...;'...................._.......¡................._..........;. ¡1¡~I~¡¿g:;:;~~;:~~;~~~:.i~ê~::'~';~':~¡,~~.~~~;";'~¡¡'~1¡"¡"~¡"::;";:f":":';:::":':":'::~'¡;:1"1"1';1"~'1i;;.;~;: ¡ KOP Cry 10/100 90' PI ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡r¡-'Ir--'Ifl" 5~ . 5000 -1000 o 1000 2000 3000 4000 5000 Vertical Section (ft) Azim = 130·, Scale = 1(in):1000(ft) Origin = 0 N/-S, 0 E/-W 6000 7000 ^ ^ ^ z g o o '!< ~ ~ II Q) ro () C/) C/) V V V Schlumberger WELL FIELD Prudhoe Bay Unit - WOA STRUCTURE L-P AD L-201 PB3 (P5) Magnetic Þatamete~ Model: BGGM 2003 SurfaoaLocatioo Lat: N70212.654 Lon: W1491924.511 NAD21 Alaska Slate Planes, Zone 04, US FE181 Northing: 5918320.84ftUS GridConv; +0.63713312' Easling: 583325.34 ftUS Scale Fact: 0.9999078872 Ml&cellaneoua Slot: N-U Plan: L-201L3(PS)OA Dip; 80.823' Mag Dee: +215.012' Date: April 02. 2004 FS; 57560.5nT TVD Ref: RotaryTable (18.TO It above MSL) &vy Date: JanU8l)' 29, 2004 1500 2000 2500 3000 3500 4000 4500 5000 2500 . :IV ¡ Cry 6/ioo ; ; Jti.. ¡ ¡ ':::'7:::' '~1~:;;:~~....I.._m...........r......r_m......mm_mI-... ~~,~~~?1.............,,····...............,+...,...........,.,.............,.,.j.....,.., t""···~ ¡ ! ... t,·· ............".... .......'...... .j.... ............ ......... ...., ....·t....'.... .......... ..... .,.., ..'...-¡-...."... ........ ,.........,. .,.. ...¡...... ........ ..... "!Ëíið' CN .... ........................ 2000 En'1:fv~ OIl 00 Tr 21 Cry 6/100 1500 . 2500 2000 1500 . .-201 (P5b) OBd K .-201 L 1 (P3) OBb ! .-201L2 (P3) OB. 1000 500 1500 2000 2500 3000 3500 <<< W Scale = 1 (in):500(ft) E >>> 4000 4500 5000 1000 500 . . BPX AK Anticollision Report NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 50.00 ft Depth Range: 6158.00 to 9667.95 ft Maximum Radius: 10000.00 ft Reference: Error Model: Scan Method: Error Surface: Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Survey Program for Definitive Wellpath Date: 1/8/2004 Validated: No Planned From To Survey ft ft 28.50 6158.00 Planned: Plan #5 V1 (0) 6158.00 9667.95 Planned: Plan #5 V1 Version: 2 Toolcode Tool Name MWD+IFR+MS MWD+IFR+MS MWD + IFR + Multi Station MWD + IFR + Multi Station Casing Points 3189.31 6158.00 9667.95 2638.70 4451.61 4443.70 10.750 7.625 4.500 13.500 9.875 6.750 103/4" 7-5/8" 4 112" Summary EX NWE#1 NWE1-01A NWE1-01A V4 Out of range EX NWE#1 NWE1-01 NWE1-01 V3 Out of range PB L Pad L-01 L-01 V14 Out of range PB L Pad L-01 L-01 L 1 V2 Plan: Plan # Out of range PB L Pad L-02 L-02 V1 Out of range PB L Pad L-02 L-02PB1 V21 Out of range PB L Pad L-102 L-102 V2 9661.31 7250.00 1 093.43 121.97 971.45 Pass: Major Risk PB L Pad L-102 L-102PB1 V10 7050.00 2500.00 3801.49 67.06 3734.43 Pass: Major Risk PB L Pad L-102 L-102PB2 V2 7050.00 2650.00 3664.84 66.96 3597.88 Pass: Major Risk PB L Pad L-103 L-103 V23 9252.48 6800.00 669.44 90.10 579.34 Pass: Major Risk PB L Pad L-104 L-104 V7 Out of range PB L Pad L-105 L-105 V4 Out of range PB L Pad L-106 L-106 V14 7050.00 4850.00 2817.63 79.91 2737.72 Pass: Major Risk PB L Pad L-107 L-107 V14 Out of range PB L Pad L-108 L-108 V18 Out of range PB L Pad L-109 L-109 V12 Out of range PB L Pad L-110 L-110V11 Out of range PB L Pad L-111 L-111 V24 Out of range PB L Pad L-112 L-112 V8 Out of range PB L Pad L-114 L-114V15 Out of range PB L Pad L-115 L-115 V7 Out of range PB L Pad L-116 L-116 V10 Out of range PB L Pad L-117 L-117V11 Out of range PB L Pad L-118 L-118 V9 6158.00 7600.00 1747.06 84.37 1662.69 Pass: Major Risk PB L Pad L-119 L-119V9 6437.92 6100.00 132.09 78.47 53.62 Pass: Major Risk PB L Pad L-120 L-120 V8 8334.44 6500.00 410.84 102.79 308.05 Pass: Major Risk PB L Pad L-121 L-121 V14 Out of range PB L Pad L-121 L-121A V1 Out of range PB L Pad L-122 L-122 V5 Out of range PB L Pad L-200 Plan L-200 OBd V1 Plan Out of range PB L Pad L-200 Plan L-200L 1 OBa V3 PI Out of range PB L Pad L-200 Plan L-200L2 OA V3 Pia Out of range PB L Pad L-21 0 L-210V6 9230.33 6350.00 987.98 85.71 902.27 Pass: Major Risk PB L Pad L-210 L-210PB1 V8 9236.36 6250.00 1003.91 83.29 920.62 Pass: Major Risk PB L Pad Plan L-113 (N-B) Plan L-113 V5 Plan: PI Out of range PB L Pad Plan L-123 (N-R) Plan L-123 V1 Plan: PI 8147.58 6850.00 298.49 110.15 188.33 Pass: Major Risk PB L Pad Plan L-124 (N-C) Plan L-124 PB1 V1 Plan Out of range PB L Pad Plan L-124 (N-C) Plan L-124 V1 Plan: PI Out of range PB L Pad Plan L-201 (N-U) Plan L-201 OBd V1 Plan 6199.97 6200.00 0.95 81.12 -80.17 FAIL: Major Risk PB L Pad Plan L-201 (N-U) Plan L-201 L 1 OBb V2 PI 6199.97 6200.00 0.95 81.21 -80.26 FAIL: Major Risk PB L Pad Plan L-201 (N-U) Plan L-201L2 OBa V2 PI 6199.97 6200.00 0.95 81.21 -80.26 FAIL: Major Risk PB L Pad Plan L-211 (N-H) Plan L-211 V1 Plan: PI Out of range --294 ......·200 ······100 -0 --100 "·200 -294 Field: Prltußoe Bay Site: PB L Pad Well: Plan L-201 (N-U) Wellpath: Plan L-201L3 OA Plan L-201 (N-V) (Plan L-201 OBd) 27Û' 180 2,4 . 90 . Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [IOOft/in] e e PERMIT TO DRILL 20 MC 25.005 (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary well bore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent well branch, the application for a Permit to Drill need only include information under (c) of this section that is unique to that branch and need not include the $100 fee. . . TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER 'YELL NAME /ð 6{ ¿- 201 L.3 PTD# .zotf - 0 i 1 X·Development Service CHECK WßA T APPLIES ADD-ONS (OPTIONS) MULTI LATERAL x (If API num ber last two (2) digits are between 60-69) Exploration Stratigraphic ~'CLUEn Tbe permit is for a new weJlboresegment of existing weD /J1J?1 L- 20/ Permit No~o~-o~~API No. 5c -ó/-1 ~ .:z.J 2..0..2-.. Production sbould continue to be reported as a function· of tbe original API number. stated above. BOLE In accordance witb20 AAC 25.005(f), all records, data and logs acquired for tbe pilot bole must be clearly differentiated In botb name (name on permit plus PH) and API Dumber (SO 70/80) from records, data and logs acquired for we)) (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Tbe permit is approved subject ·to fuD compliance witb 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumestbe liability of any protest to tbe spacing exception tbat may occur. All dry ditcb sample sets submitted to tbe Commission must be in no greater tban 30' sample intervals from below tbe permafrost or from wbere samples are first caugbt and 10' sample intervals tbrough target zones. . . ~ o Well bore seg Annular Disposal Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: ffiUDHOE BAY UN ORIN L-201 L3 _ Program DEV --~ PTD#: 2040490 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L- GeoArea 890 Unit j 1650 On/Off Shore On Administration 1 p~(I1")itfee attache_d _ - - - - ~ Yes 2 _Lease_number _appropri<lte_ _ _ Yes 3 _U_nlque weltn_ame_a[1d oL!mP.er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - y~s ~ - - - - - - - - - - - - - - - - - - - - - - -- 4 WelIJoc<lt~d in a d_efine.ctpool_ _ _ - - - - Yes 5 WeJIJoc<lled proper _distance_ from driJling unitbound_al"Y_ _ _ _ - - y~s - - - - - - - - 6 WellJoc<lled proper _distance_ from other wells ~ - - - y~s 7 _S_ufficient _acreage_aYail<lble indJilIiog unjt_ y~s 8 J(d~viated, js weJlbore plaUocJu_ded _ _ Yes - - - - - - - - 9 _Qperator only affected party _ - - - - - - Yes 10 _O-perator bas_appropriateJ~ond inJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - Y~$ - - - - - - - - - - - - - - - - - - - - - - - -- 11 P~rmit c.ao be iSSL!ed without conserva_tion order _ _ - - -- - Y~s Appr Date 12 P~rmilcao be issued without ad_mioistratille_approval _ Y~s - - - - RPC 3/8/2004 13 Can permit be approved before 15-day wait Yes 14 WeJIJocaled within area and_strata _authorized by_lojectioo Ord~r # (puUO# incomm~[1t$>-(For _NA 15 AJlwel!s_witÞinJl4J1)ile_area_ofreyiewid~Ot[fied(FJ)rsefVjc.eJr(ellooly)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA - - - - - - - - - - - - - - - - - . -- - - - -- 16 Pre-produced i[1jector: .c:tur<ltio_nof pre--pro.c:tuctioo I~Ss. tÞal13 months_ (for_service well onJy) _ _ _NA 17 ACMP_FJndjngofCon_siste[1cy_h_as beenJs.sued_forJbis Project _ _ _ _ _ NA Engineering 18 C_o[1ductor stringpJovided _ _ - - -- _ _ _NA 19 _Swface _casing protects al'-known USDWs _ _ _ _ _ _NA 20 _CMTvoladeQuateJo circ_ulate_on_cood_uctor& SUJfcsg _ _ NA 21 _CMT vol adeQuateto tie-in Jong string losurf csg _ _ __NA 22 _CMT will coyeraJl koownproductiye hori¡tol1s No_ Slotte_d, - - -- 23 C_asiog de_si~[1s ad_equate for C,T, B_&perroafrosl _ _ _ _ _ Yes 24 A.c:tequ<lte_tankageoneselYe pit _ _ _ _ _ _ _ _ _ _ _ y~s Nabors9ES, - - -- 25 JtaJe-.c:trilt has a_ 10-403 for <lbandOl1ment be~o <lPPJoved _ _ _NA Quadlateral._ _ _ 26 A.c:tequ<lteJ/llellboresepar<ltjon_propose.c:t_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - y~s - - - - - - ~ - - - - - - - - - - - - ~ 27 J(div~cterJeq_uired, does it me~t reguJatioos_ _ _ _ _ NA Sidetrack. _ . _ Appr Date 28 DJilliog fJuid_ program schematic & eC1-uip Jistadequ<lle _ _ _ _ y~s Max MW9,2 ppg. _ _ WGA 3/8/2004 29 ßOPEs,d9Jhey meelreguJa.tiolJ _ y~s 30 _BOPEpress ralil)g approp(Ïate;test lo_(puJ psig Ln_commeots) Yes Test lo_35QQpsi.MS~ 16_80 psi. - - - - - 31 C_hokema.nifold compJies w/APt RF>-53 (May 84)_ . Yes 32 Work will occur withoLJloperatio!1_shutdow.n _ _ . y~s ~ - - - 33 Is presence of H2S gas_ prob.able. . - ~ - - ~ No. - - - - 34 Meçhanical_coodition of wells withio AOB yerified (fors_ervjce welJ onJy) .NA ~ - Geology 35 P~rmit c.an Þe issued w/o hydrogen sulfide meaSUres _ _ . y~s 36 D_ata_ PJeseoted 011 pote_ntial oveJpres_sure _zooes _ _ _ NA Appr Date 37 _S~ismic_analysjs_ of shaJlow gaszol)es_ . NA - - -- RPC 3/8/2004 38 _S~abed _cOlJditiol) survey (if off-shore) _ . _NA 39 . Contact namelpÞoneforweekly progress reports (exploratol"Yonly] NA Geologic Date: Engineering Date ;¡~f Commissioner Commissioner: bfS ~(?J1-