Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-050 e e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q 0 4-- - 0 SO Well History File Identifier Organizing (done) o Two-sided 111/11111111111111I o Rescan Needed 111111111111111I11I RES CAN DIGITAL DATA ~kettes, NO.' o Other, NolType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a large Scanner o Color Items: o Greyscale Items: o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o logs of various kinds: NOTES: Date (0 ~ o Other:: Scanning Preparation BY: +b = TOTAL PAGES (Count does not include cover sheet) /5/ vwp Is~llllllIIlIl~ 11111 WI P &;¡Ç p BY: ~ /5/ Project Proofing BY: ~ Date: Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: _~YES BY: ~ Date: to f;;./oloh 11111111111111 ,,1/1 NO /5/ VV\f NO Stage 1 If NO in stage 1, page(s) discrepancies were found: YES BY: Maria Date: /5/ 11111111111I111111I Scanning is complete at this point unless rescanning is required. ReScanned III 1111111111111111 BY: Maria Date: /5/ Comments about this file: Quality Checked 11I111/111111111111 10/6/2005 Well History File Cover Page.doc • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 - 6612 ! 0 C 9 ED August 22, 2011 Si`'" Lit 41.16 3 1 2011 b 011 & Gas Cana. no ►rsrlhssan Mr. Tom Maunder 4 ncherags Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Anchorage, Alaska 99501 a014-0s-0 Subject: Corrosion Inhibitor Treatments of GPB P -Pad P_, 9,7 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB P- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) P -Pad Date: 07/21/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal P - 1920920 500292228700 0.30 NA 0.30 NA 0.85 4/24/2010 P -02A 2000840 500292237601 0.30 NA 0.30 NA 4.25 4/25/2010 P -03A 1972280 500292217601 12.70 5.0 0.30 7/12/2010 2.55 8/5/2010 P -04 1910760 500292218000 1.80 NA 1.80 NA 15.30 4/25/2010 P -05A 2000510 500292254501 0.80 NA 0.80 NA 5.95 4/25/2010 P -06B 2051380 500292216602 11.30 3.0 1.00 7/12/2010 9.35 8/5/2010 P -07A 2011960 500292253501 0.50 NA 0.50 NA 1.70 4/24/2010 P -08A 2000850 500292237701 0.10 NA 0.10 NA 0.85 4/24/2010 P -09 1930580 500292236200 0.10 NA 0.10 NA 0.85 4/24/2010 P -10 1910520 500292215800 3.00 NA 3.00 NA 28.05 4/24/2010 P -11 1910290 500292214300 3.00 NA 3.00 NA 23.80 4/23/2010 P -12B 2001330 500292213602 0.30 NA 0.30 NA 0.85 4/23/2010 P -13 1901110 500292208000 0.30 NA 0.30 NA 1.70 4/23/2010 P -14 1910070 500292212900 7.50 NA 7.50 NA 56.10 7/21/2011 P -16 1901630 500292211300 4.30 NA 4.30 NA 37.40 4/22/2010 P -17 1901550 500292210500 8.00 NA 8.00 NA 89.30 4/28/2010 P -19 1901360 500292209400 0.80 NA 0.80 NA 5.10 4/21/2010 P -20B 2001590 500292208902 0.20 NA 0.20 NA 0.85 4/21/2010 P -21B 1970640 500292214802 0.40 NA 0.40 NA 4.30 4/21/2010 P -22 1931210 500292239600 0.30 NA 0.30 NA 1.70 4/23/2010 P -23 1931120 500292239300 0.30 NA 0.30 NA 0.85 4/24/2010 P -24 1970540 500292275500 1.80 NA 1.80 NA 8.50 4/24/2010 P -25 1970260 500292274200 64.00 24.0 2.60 7/17/2011 23.80 7/20/2011 P -26 1962000 500292272700 2.60 NA 2.60 NA 22.10 4/25/2010 rl p P -27 2040500 500292320300 1.00 NA 1.00 NA 6.80 4/25/2010 P -28 2100480 500292342500 1.20 NA 1.20 NA 10.20 8/7/2010 • • -,~:, MICROFILMED 03101/2008 DO NOT PLACE Rte:. ~~, ~:~,,: . r ~ ANY NEW MATERIAL UNDER THIS PAGE F: ~I.aserFiche\C~rPgs_Inserts~Microfiltn_Marker. doc Schlumberger ~{;ANNED OCT 3 1 2DúB RECEIVED 10/12/06 OCT 1 6 2006 NO. 3990 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth f)òt...{-05-ö ¡t I ~( 1"11) Company: .~ Cil & Gas Cons. Commission Anchcrage State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay WII J # L D . i D t BL CI CD e ob og escrlpt on ae o or 12-29 11072867 INJECTION PROFILE 07/07/05 1 Z-19A 11212887 USIT 09/12/06 1 MPH-14 11414383 LDL 09/21/06 1 Z-23B 40010787 OH EDIT OF MWD/LWD 09/04/04 2 1 P-27 40010459 OH EDIT OF MWD/LWD OS/21/04 2 1 { ( Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ ç' Jw-L ^'~ ~ DATA SUBMITTAL COMPLIANCE REPORT 5/25/2006 Permit to Drill 2040500 Well Name/No. PRUDHOE BAY UNIT P-27 Operator BP EXPLORATION (ALASKA) INC 3, t.t,¿ ') 7 A.,:J «\:J '-I API No. 50-029-23203-00-00 MD 18584./ TVD 8956 ,./ Completion Date 5/25/2004./' Completion Status 1-01L Current Status 1-01L UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: MWD 1 GR 1 RES, MWD 1 GR / RES 1 PWD, MWD 1 PWD 1 GR 1 RES Well Log Information: Logl Electr Data Digital Dataset Type Med/Frmt Number (data taken from Logs Portion of Master Well Data Maint Name Interval . Log Log Run OH/ Scale Media No Start Stop CH Received Comments 6m2004 ... I 0 0 6m2004 I ----.J Sample Interval Set Start Stop Sent Received Number Comments D Asc Directional Survey Directional Survey Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? ~ Chips Received? ~ Daily History Received? ~: . Formation Tops Analysis '!..!J:V Received? Comments: (\Ie, ~~ ~""-- ~ ~. ~ R.VV\,....:1 Compliance Reviewed By: ~ Date: ).. a J~ ~ ~ Andy, No open hole logging data was submitted for PBU P-27 API 50-029-23203-00. Please send over bluelines, reproduceables, and digital logging data for this well. TNX Howard . STATE OF ALASKA 41 AlASKA~IL AND GAS CONSERVATION COMMISSION ire WELL COMPLETION OR RECOMPLETION REPORT AND LO'O 1a, Well Status: !HI Oil DGas D Plugged D Abandoned D Suspended DWAG 1.~,)Me!' ClaS$; ...;""i ....... 20AAC 25.105 20AAC 25.110 . á DevelOPrrtentp.Exploratory DGINJ DWINJ D WDSPL No. of Completions One Other D Stratigraphic 0 Service 2. Operator Name: 5. Date Camp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 5/25/2004 204-050 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 4/27/2004 50- 029-23203-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 5/21/2004 PBU P-27 2491' NSL, 3051' WEL, SEC. 31, T11N, R13E, UM 8. KB Elevation (ft): 15, Field 1 Pool(s): Top of Productive Horizon: 1631' SNL, 1907' EWL, SEC, 02, T10N, R12E, UM 80,1' Prudhoe Bay Field / Prudhoe Bay Pool Total Depth: 9. Plug Back Depth (MD+ TVD) 4986' SNL, 2408' EWL, SEC. 02, T10N, R12E, UM 18584 + 8956 Ft 4b, Location of Well (State Base Plane Coordinates): 10, Total Depth (MD+TVD) 16. Property Designation: Surface: x- 631238 y- 5947218 Zone- ASP4 18584 + 8956 Ft ADL 028265 TPI: x- 620704 y- 5942920 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 621263 y- 5939573 Zone- ASP4 (Nipple) 2567' MD 18. Directional Survey 19. Water depth, if offshore 20. Thickness of Permafrost !HI Yes DNa N/A MSL 1900' (Approx.) 21, Logs Run: MWD / GR / RES, MWD / GR / RES / PWD, MWD / PWD / GR / RES 1 AIM 22. CASING, LINER AND CEMENTING RECORD 9$f~~ ,........,.,.,.,.,. SEtTING EP1'HMP SEtTING EptHWP ~?i'l .,¡ n......."..'T .' VVT;·· P¡::Q Fr., GRADE .'" fOP BOrrOM TOP BOTTOM t"ULLEO 20" 91.5# H-40 Surface 120' Surface 120' 42" Driven 10-3/4" 45.5# L-80 29' 4707' 29' 3333' 13-1/2" 910 sx AS Lite, 341 sx Class 'G' 7-5/8" 29.7# L-80 27' 14814' 27' 8857' 9-7/8" 1053 sx Class 'G', 159 sx Class 'G' 4-1/2" 12.6# L-80 14656' 18502' 8760' 8972' 6-3/4" Un cemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. ... ii J iJt:UNb i·¡' Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Section 4-1/2", 12,6#,13Cr80 14660' 14600' MD TVD MD TVD 15140' - 15432' 8979' - 9034' 1.25. ,.¡.t\Glb,·'.r iii" ,'i iii·· 15769' - 18458' 9038' - 8979' ...""..",,, , DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 105 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): June 27, 2004 Gas Lift Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF W A TER-BBl CHOKE SIZE GAS-Oil RATIO 6/28/2004 4 TEST PERIOD .. 1,047 1,093 -0- 35° 1,044 Flow Tubing Casing Pressure CALCULATED .. Oll-BBl GAs-McF W A TER-BBl Oil GRAVITY-API (CORR) Press. 750 1,380 24-HoUR RATE 6,282 6,560 -0- 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". fëëj--"""'-' JJt \)~ î ",S' I None . COMPLETiON ~. OR\G\NAL ;..~···Bf'-' ~~'~ / A}4" \::.,~'," ' . ~;D Form 10-407 R ~vl::;~u I ¿I ¿VI 3 . C NTI UED R E E D o N ON EV RS SI E GFc; '28. GEOLOGIC MARKERS NAME MD Sag River 14815' Shublik A 14842' Shublik B 14914' Shublik C 14958' Eileen 15012' Sadlerochit 15132' 29. FORMATION TESTS Include and briefly summarize test results. List intervals tested, rvD and attach detailed supporting data as necessary. If no tests were conducted, state "None". 8858' None 8874' 8913' 8932' 8951' 8978' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed L T'tl T h· I As . t t Terrie Hubble /' I (j) I e ec mca 515 an Date ore (30/0 PBU P-27 Well Number 204-050 Permit No. / Prepared By Name/Number: Drilling Engineer: Terrie Hubb/e, 564-4628 Neil Magee, 564-5119 roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments, ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". 0- ,-, . l\ L j ~ ¡L..J\ ITEM 29: List all test information, If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRlll+COMPlETE NABORS ALASKA DRilLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 4/24/2004 09:00 - 13:00 4.00 MOB P PRE Disconnect Mud & Service lines. Bridle Up. UD Rig Tongs, UD Chute, Remove Handrails, Remove Pins from Torque Tube. Move Pit Complex & Satellite Camp to P-Pad. 13:00 - 00:00 11.00 MOB P PRE Prepare Derrick to UD. PJSM wi Tool Pusher. Layover Derrick, Move Sub off V-100. Move Shop to P-Pad. 4/25/2004 00:00 - 01 :00 1.00 MOB P PRE Move Shop, Parts House to P-Pad & Spot. 01 :00 - 14:00 13,00 MOB P PRE Move Sub from V-Pad to P-Pad. 14:00 - 17:00 3.00 MOB N RREP PRE ELMAGcO I Baylor brake found to be defective in premove inspection. Pull w/crane & set in shop. 17:00 - 20:00 3.00 MOB P PRE Change out Drilling Line Spool & N/U 21 1/4" Hydril 'GK' Diverter, 20:00 - 00:00 4.00 MOB N RREP PRE Install new Baylor Brake. 4/26/2004 00:00 - 01 :30 1.50 MOB N RREP PRE Continue to R/U Baylor Brake, 01 :30 - 05:30 4.00 MOB P PRE Spot Sub over P-27. 05:30 - 07:30 2.00 MOB P PRE Spot Pit Module, 07:30 - 12:00 4.50 RIGU P PRE Berm Cellar. Hook up Service Lines. N/U Riser, N/U Diverter. Spot cuttings Tank. C/O Liners on Pumps to 6". 12:00 - 13:30 1.50 RIGU N RREP PRE Complete Installation and calibrotion of Baylor Brake. ACCEPT RIG @ 13:00 HRS 4/26/2004 13:30 - 20:00 6.50 RIGU P PRE Raise Derrick, Unbridle Blocks, Raise Pipe Shed Chute, Pin Torque Tube, Hook up Blocks to Top Drive, Install Kelly Hose, Install Bails & Elevators Change Top Drive Quill to 41/2" IF 20:00 - 22:30 2.50 RIGU P PRE Rabbit & P/U 5" DP from Shed 22:30 - 00:00 1.50 RIGU N RREP PRE Baylor Brake leaking Glycol I Water Cooling Fluid to Drawworks Drip Pan. Ascertain Problem and Repair. 4/27/2004 00:00 - 03:30 3.50 RIGU P PRE Rabbit, PIU & Stand Back 45 Stands of 5" DP 03:30 - 04:30 1.00 RIGU P PRE Function Test Diverter. Witness of Test waived by John Spaulding, AOGCC. 04:30 - 06:00 1.50 RIGU P PRE Rabbit, PIU & Stand Back 9 Stands of 5" HWDP. 06:00 - 07:00 1.00 RIGU P PRE Connect Topdrive blower hose, Rig up Gyro tools and sheave 07:00 - 10:00 3.00 RIGU N PRE Install flow meters on Glycol lines to electric brake 10:00 -11:00 1.00 RIGU P PRE Pickup Bit- Motor-XO- 1 stand HWDP as-per Directional driller, fill riser and check for leaks 11 :00 - 12:00 1.00 DRILL P SURF Clean out conductor and Drill from 110' to 148',420 gpm, 300 psi, 5-10K wob, 50 rpm, torque on bottom 1,000 ftIlbs. ART= ,25 12:00 - 13:00 1.00 DRILL P SURF Stand back 1 stand HWDP, pickup MWD and orient 13:00 - 14:00 1.00 DRILL P SURF Drill from 148' to 300', 420 gpm, 375 psi, 5-10K wob, 50 rpm, torque on bottom 1,000 ftIlbs. Pickup weigth 55,000# down weight 55,000#, rotating weigth 55,000# ART = .50 14:00 - 15:00 1.00 DRILL P SURF POH to 160', pickup remaining BHA, Trip in to 300' 15:00 - 15:30 0.50 DRILL P SURF Run Gyro Survey at 300' to begin kickoff 15:30 - 00:00 8.50 DRILL P SURF Directional drill 13.5" hole from 300' to 1,093', Pump rate 550 gpm. 1,010 psi off bottom, 1,250 psi on bottom, 1 0-25k wob, 50 rpm, torque on bottom 2,000 ftIlbs, off bottom 1,000 ftIlbs. Pickup weight 85,000# down weight 75,000# rotating weight 78,000# Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 4/27/2004 15:30 - 00:00 8.50 DRILL P SURF ART = 1.22 AST = 4.28 4/28/2004 00:00 - 16:30 16.50 DRILL P SURF Directional drill 13.5" hole from 1,093' to 2,410', Pump rate 560 gpm, 1,300 psi off bottom, 1,500 psi on bottom, 30-40k wob, 50 rpm, torque on bottom 7,500 Nibs, off bottom 3,500 Nibs, Pickup weight 105,000# down weight 87,000# rotating weight 93,000# ART = 2.75 AST = 8.84 ADT = 11.59 16:30 - 17:30 1.00 DRILL P SURF Circulate hole clean, monitor well, blow down topdrive 17:30 - 19:30 2.00 DRILL P SURF Held PJSM, POH to BHA no problem, hole took the proper fill. 19:30 - 20:30 1,00 DRILL P SURF Down load MWD tools 20:30 - 21 :30 1,00 DRILL P SURF Change bit, adjust Motor to 1.5 deg. and lay down orienting sub, 21 :30 - 22:30 1.00 DRILL P SURF Service Rig and Topdrive, 22:30 - 00:00 1.50 DRILL P SURF Surface test MWD, RIH @ 1,640' took weight (40k) rotated drill string 180 deg, and got past obstruction, RIH, to 2,314'. Made up topdrive and washed last stand to bottom. 4/29/2004 00:00 - 12:00 12.00 DRILL P SURF Held PJSM. The first two connections after getting back on bottom we were experiencing excess drag 10-25k and packing off, back reamed the full stand slow to allow hole to clean up, Had no further problem. Directional drill from 2,410' to 4,010 Pump rate 650 gpm. with 1830 psi off bottom, 2000 psi on bottom, 100 rpm. 7000 Nibs off bottom, 8,000 to 9,000 fVlbs on bottom. Pickup weight 135,000#, down weight 88,000#, Rotating weight 102,000# ART = 5.35 AST = 2.21 ADT = 7.56 12:00 - 18:00 6.00 DRILL P SURF Held PJSM, Directional drill 13.5" hole from 4,010' to TD @ 4,720', Flow rate 650 gpm, @ 2100 psi on bottom, 1900 psi off bottom, 100 rpm, 8,500 Nibs off bottom, 9,500 Nibs on bottom. Pickup weight 145,000#, down weight 88,000#, Rotating weight 108,000# ART = 3,8 AST = .63 ADT = 4.43 18:00 - 20:00 2.00 DRILL P SURF Circulate two bottoms up, Pump rate 660 gpm, with 2,000 psi rotating 110 rpm, rotary torque 8,500 Nibs. 20:00 - 23:00 3.00 DRILL P SURF Monitor well, blow down topdrive, POH, work through tight spot at 2,920' continue Pulling out, to 2,596' Back ream from 2,596' to 2,126' - 1,938' to 1,844' with 550 gpm @ 1,300 psi. 60 rpm. torque 7,500 to 8,500 Nibs. In order to reduce doglegs in these areas. 23:00 - 00:00 1.00 DRILL P SURF Continue Pulling out from 1,844' to 1,562', Had tight hole at 1,640' on previous trip, no problems this trip. 4/30/2004 00:00 - 01 :00 1,00 DRILL P SURF RIH from 1,562' to 4720' no adverse hole conditions, no fill on bottom. 01 :00 - 03:00 2.00 DRILL P SURF Circulate two bottoms up, after first bottoms up, mud weight coming back was 10.0 ppg. and Viscosity was 350. After final bottoms up mud weight was 9.5 ppg Viscosity was 220. Circulating rate 650 gpm with 1,950 psi, 110 rpm, rotary torque @ 7500 Nibs. 03:00 - 06:30 3.50 DRILL P SURF POH to BHA no hole problems. 06:30 - 08:30 2.00 DRILL P SURF Lay down BHA, Clear Floor. 08:30 - 10:30 2,00 CASE P SURF Rig up 10 3/4" casing equi[pment, Pickup casing hanger and landing jt. Make dummy run. 10:30 - 11 :00 0.50 CASE P SURF Hold PJSM with Co. Rep. and Toolpusher 11 :00 - 22:00 11.00 CASE P SURF Run 113 jts. 103/4" 45.5# L-80 BTC. Casing as-per Running Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 4/30/2004 11 :00 - 22:00 11.00 CASE P SURF order. Ran casing to 3,384' started losing pipe displacement while running in. Energize Franks tool, break circulation with 1,5 bpm.at 190 psi. Slight returns reciprocating pipe, Mud coming back 300 + viscosity, CBU staging up pumps to 3 bpm with 260 psi. Returns steadily increasing. Wash from 3,384' to 4,706' at 3 bpm. with 275 psi. Make up landing Joint and land casing, Total mud lost while running casing = 156 bbls. 22:00 - 00:00 2.00 CEMT P SURF Break circulation with 2 bpm @ 190 psi reciprocating pipe 15', initial losses 25 bph, This rate continued decreasing, stage pumps up to a final rate of 7 bpm. @ 370 psi, Once Bottoms up was achieved we had full returns. Dropped Viscosity to 80 and YP to 18 going in, had 100 viscosity and 19 YP coming back. 5/1/2004 00:00 - 00:30 0,50 CEMT P SURF Held PJSM, With Co. Rep, Toolpusher Dowell cementers,and Veco truk drivers. 00:30 - 01 :00 0.50 CEMT P SURF Continue circulating, While Dowell primes up and Trucks are in position, 01 :00 - 05:00 4.00 CEMT P SURF Pump 5 bbls of water Test Lines to 3,500 psi. Pump 80 bbls Mudpush 10,1 ppg @ 6 bpm 150 psi., Drop bottom plug and pump 720 bbls. (909 sx) 10,7 ppg lead cement 7.5 bpm @ 250 psi. Reciprocate pipe 15' stroke ,set hanger on landing ring when 670 bbls lead cement away, Followed by 71 bbls (342sx) Tail cement 15.8 ppg 4.5 bpm @ 280 psi. Drop top plug and Pump 5 bbls water and Displace with rig Pumps @ 10 bpm. with 980 psi. Slowed rate to 6 bpm. 320 bbls into displacement, so trucks keep up. Bumped plug with calculated strokes to 1500 psi. Bled off pressure and checked floats, floats held. 115 bbls clean cement to surface. 05:00 - 06:30 1.50 CEMT P SURF Lay Down casing and cement equipment, Flush riser, back out Landing Jt. 06:30 - 08:30 2,00 DIVRTR P SURF Nipple down 20" riser, Hydrill and diverter line, ( Change Pump liners to 5.5") clean pits, 08:30 - 09:30 1.00 WHSUR P SURF Install FMC casing head, and 11" X 11" 5M G5 tubing head, and test M to M seal to 1,000 psi. for 10 min, 09:30 - 12:00 2.50 BOPSU SURF Nipple up Bop, and riser 12:00 - 13:00 1.00 BOPSU SURF Rig up BOP test equipment. 13:00 - 18:30 5,50 BOPSU SURF Test BOP to 250 psi low, 4,000 psi high, per rig testing procedure, Witness of the BOP test was waived by Jeff Jones with AOGCC. 18:30 - 19:30 1.00 BOPSU SURF Rig down testing equipment, blow down choke manifold and lines. 19:30 - 23:00 3.50 CEMT P SURF Pickup 72 jts. 5" DP and rack back in Derrick. 23:00 - 23:30 0.50 CEMT P SURF Install wear ring. 23:30 - 00:00 0.50 DRILL P INT1 Pickup drill out assembly as-per Directional driller. 5/2/2004 00:00 - 05:30 5.50 DRILL P INT1 Held PTSM. RIH with clean out assembly, Pickup 120 jts 5" DP to 4605' 05:30 - 06:30 1.00 DRILL P INT1 Slip and Cut drilling line. 06:30 - 07:30 1.00 DRILL P INT1 Rig up test equipment and test casing to 3,500 psi for 30 min. Record on chart. Bled off pressure and rig down test eqipment. 07:30 - 10:00 2,50 DRILL P INT1 Drill out 10.75" shoe track and 20' of new hole to 4,740' Flow rate 562 gpm at 1,150 psi. 80-100 rpm, torque 8000 ftllbs. 5-10K wob, Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/2/2004 10:00 - 10:30 0.50 DRILL P INT1 Displace well with new 9.6 ppg LSND mud with 2% lubricants. 10:30 - 11 :30 1.00 DRILL P INT1 Pull back inside casing, rig up testing equipment, and perform LOT. Shoe MD 4,707' shoe TVD 3,331' test Mud wt. 9.6 ppg. surface pressure 825 psi. with and EMW 14,36 ppg. Rig down test equipment. 11 :30 - 14:00 2.50 DRILL P INT1 Pump dry job and POH for Rotary steerable drilling assembly. Monitor well at BHA 14:00 - 15:00 1.00 DRILL P INT1 Lay down clean out assembly 15:00 - 18:00 3.00 DRILL P INT1 Pickup rotary steerable tools as-per Directional driller, test rotary steerable tool, Pickup MWD tools and test same, Blow down topdrive. 18:00 - 22:00 4.00 DRILL P INT1 RIH picking up 126 jts of 5" DP to 4319' 22:00 - 23:00 1.00 DRILL P INT1 Service Rig and topdrive 23:00 - 00:00 1.00 DRILL P INT1 Continue picking up 12 jts 5" DP. to 4705' Break circulation, Establish base line ECD with the following parameters, Mud weight 9.7 ppg, PV 16, YP 27, Flow rate 650 gpm, 80 rpm ECD = 10.31, Flow rate 450 gpm, 80 rpm ECD = 10.30, 5/3/2004 00:00 - 06:00 6.00 DRILL P INT1 Held PTSM, Directional drill 9.875" hole, from 4,740' to 6,213', drilling parameters - 10k wob 650 gpm,at 1,710 psi 140 rpm, torque 9000 ftllbs, up weight = 130,000# down weight = 85,0003, string weight = 105,000#, Calculated ECD at 5400' = 10.43, actual = 10.78. After acquiring base line information, and slow pump rates, began drilling with the above parameters, except rotating 80 rpm, the rotary torque was erratic running from 5,000 ftllbs to 17,000 ftllb. the bit acted like it was balled up, increased lubricant concentration from 2 % to 4% with 3 drums flow-lube, 3 drums lubtex, 3 drums drill zone, and 2 drums DD, At 5,000' the rotary torque smoothed out and is currently running a steady 8,000 ftllbs ADT = 3.5 06:00 - 12:00 6,00 DRILL P INT1 Directional drill 9.875" hole with RSS. From 5,500' to 6,213' , With 10 to 12k wob, 140 rpm, Torque 10k on bottom, 9k off bottom, 650 gpm with 1,830 psi. Up weight 145k, down weight 105k, string weight 11 Ok. Calculated clean hole ECD has been between 10.23 to 10.44 the actual has been between 10.60 to 10.87. Back reaming 30' on connections ADT = 4.33 12:00 - 00:00 12.00 DRILL P INT1 Directional drill 9.875" hole with RSS. From 5,213' to 7,068', with 10 to 15k wob, 145 rpm, Torque 12 to 13k on bottom, 9k off bottom, 650 gpm with 1,850 psi. Up weight 160k, down weight 100k, string weight 120k, pumped 15 bbl high vis sweeps at 6,400' - 6,780' - 7,060', which brought back a significant amount of cuttings, no visible change in ECD. From 6,500' to 7,000' Bit seems to ball up, intermittently slowing ROP to 50 fph at times, Began additions of nut plug and Drill zone to help with bit balling. Clean hole ECD is remaining around 10.30 to 10.45, actual has been 10.68 to 10.88 ADT = 9.75 Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/312004 12:00 - 00:00 12.00 DRILL P INT1 5/4/2004 00:00 - 20:30 20.50 DRILL P INT1 Directional drill 9.875" hole with RSS. From 7,068' to 8,860', with 10 to 15k wob, 140 rpm, Torque 12k on bottom, 10k off bottom, 650 gpm with 2,300 psi. Up weight 180k, down weight 115k, string weight 135k. ECD have remained running .30 to .40 over the calculated clean hole ECD. Pumped sweeps @ 7,068' - 7,355' - 7,828' - 8,839' Have been letting ECD trends dictate sweep frequency, Maintaining 4% lubricants, at 8,860 rotary torque is running steady at 10,800 ftIlbs. ADT = 14.47 20:30 - 21 :30 1.00 DRILL P INT1 After reaching 8,860' Rotate and reciprocate pipe at 140 rpm, pumping 650 gpm @ 2,300 psi. Pump 25 bbl sweep weighted to 12.6 ppg, sweep brought back a significant amount of cuttings. Continue circulating until shakers cleaned up.Shut down pumps and monitored well. 21 :30 - 00:00 2.50 DRILL P INT1 POH pulled 10 stds to 7,905' with no problem, pumped dry job and continue to POH, to 5,477', hole taking propper fill. 5/5/2004 00:00 - 01 :30 1.50 DRILL P INT1 Held PTSM, Continue POH from 5,477' At 5,430' started seeing an increase in drag 10k to 30k hole started swabbing. Made up topdrive and began pumping out with 550 gpm with 1,320 psi. pumped out from 5,430' to 5,240' At this point drag started increasing, 25k to 30k started back reaming with 100 rpm. rotary torque 6,000 to 8000 ftllbs. Continued back reaming to the shoe @ 4,707'. Once inside casing, pulled up to 4,490' 01 :30 - 03:00 1.50 DRILL P INT1 Make MAD pass from 4,490' to 4690' for log tie in from surface interval, at no more than 150 fph. pumping 600 gpm. 70 rpm torque 4,500 ftIlbs, 03:00 - 04:00 1.00 DRILL P INT1 Service Rig and Topdrive. 04:00 - 06:00 2.00 DRILL P INT1 RIH to 8,765', no problems on trip in. Fill Dp 25 std. in, Make up topdrive and break circulation, no fill on bottom 06:00 - 12:00 6.00 DRILL P INT1 Directional drill 9.875" hole with RSS, from 8,860' to 9,429' wob. 15 to 20K, 145 rpm, rotary torque 12,000 to 13,000 ftIlbs on bottom, torque off bottom 9,500 to 10,500 ftIlbs. pump rate 650 gpm with 2,370 psi. off bottom 2,390 psi on bottom. Pump 25 bbl weighted sweeps (11.6 ppg) at 8,860' when sweep came back the amount of cuttings doubled, but no reduction in ECD. Clean hole is 10,4, actual is 10.81. Pumped sweep at 9,240' brought back a noticeable amount of cuttings, and reduced ECD from 11.0 to 10.8. ADT = 4.5 12:00 - 00:00 12.00 DRILL P INT1 Directional drill 9.875" hole with RSS, from 9,429' to 10,450' wob. 25 to 30K, 150 rpm, rotary torque 12,000 to 13,000 ftIlbs on bottom, torque off bottom 9,200 to 11,000 ftIlbs. pump rate 650 gpm with 2,600 psi. off bottom 2,650 psi on bottom. Pumped 25 bbl weighted (11,6 ppg) sweeps at 9,807' - 10,280' saw no reduction in ECD by 10,450 ECD had climbed to 11.1 ADT = 8.85 5/6/2004 00:00 - 01 :30 1.50 DRILL P INT1 Held PTSM. Pump 25 bbl sweep weighted to 11.6 ppg. at 650 gpm, 2,600 psi rotate at 150 rpm. and reciprocate pipe one full stand. Pumped a total of 16,000 stks. ECD dropped from 11.04 to 10.76 calculated clean hole ECD is 10.5. Once sweep returned, had twice the amount of cuttings, clay balls and odd sized cuttings. 01 :30 - 13:30 12.00 DRILL P INT1 Directional drill 9.875" hole with RSS, from 10,450' wob. 5 to Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/6/2004 01 :30 - 13:30 12.00 DRILL P INT1 10k, 150 rpm, rotary torque 10,000 to 13,000 ftllbs on bottom, torque off bottom 9,000' ftllbs. pump rate 650 gpm with 2,650 psi. off bottom 2,690 psi on bottom. Pickup weight 205,000#, down weight 140,000# string weight 150,000# Drilled to 10,660', while back reaming connection with Topdrive 60' off bottom noticed ECD spicked up to 11.5 worked string back down 30' ECD dropped back to 10,9 Acted like packed off stabalizer. After connection pumped sweep, with 5,000 stks pumped hole unloaded (more than twice the normal amount) Continue drilling ahead to 11,319' control drilling at 80-90 fph to stay within the .50 ppg parameters set for this hole section. ADT = 8.60 13:30 - 16:00 2.50 DRILL P INT1 Pump 25 bbl weighted sweep at 650 gpm, 2680 psi. Reciprocate pipe full stand, rotate at 150 rpm, torque 11,500 ftllbs, Circulate hole clean monitor well, pump dry job. 16:00 - 20:00 4.00 DRILL P INT1 Held PJSM, POH from 11,319' to 4,695' hole took proper fill, no tight hole or swabbing, monitor well. 20:00 - 21 :30 1.50 DRILL P INT1 Held PJSM, Service Rig and Topdrive, Change dies on pipe handler. 21 :30 - 23:00 1,50 DRILL P INT1 Held PJSM, Slip and cut drilling line, service drawworks and adjust brakes. 23:00 - 23:30 0.50 DRILL P INT1 Function test, Annular preventer, upper and lower pipe rams for weekly function test as-per AOGCC 23:30 - 00:00 0.50 DRILL P INT1 RIH to 5,740' 5/7/2004 00:00 - 04:00 4.00 DRILL P INT1 Held PTSM. RIH from 5,740' to 11,319' filling DP evety 25 stds. No hole problems no fill on bottom, 04:00 - 07:30 3.50 DRILL P INT1 Displace well with 11,3 ppg LSND mud weighted up from 9.6 ppg with 500 bbls 14.7 ppg spike fluid, treated with black products, and 4% lubricants. Pump rate 600 gpm, SPP 2,875 psi, rotating at 145 rpm with 15,000 ftllbs. torque. When weighted mud returned to surface, all three shakers were loaded up with cuttings. Circulate an additional two bottoms up, to get weight balanced out. 07:30 - 08:00 0.50 DRILL P INT1 Establish base ECD with 11.3 ppg mud. Add the 5% Glycol while drilling ahead with following parameters, 450 gpm 80 and 150 rpm - 600 gpm, 80 and 150 rpm, No change noted in Torgue, drag, pump pressure or ECD during and aftrer adding Glycol. The 5% Glycol was added before entering the HRZ. Calculated Clean hole ECD = 11,94 Actual = 12.18. Pickup weight = 215,000# Down weight = 135,000# String weight = 155,000#, Torque on bottom = 15,000, Torque off bottom = 14,000, Pump rate 600 gpm, at 2,710 psi. Slow pump rates with new mud - #1 @ 35 spm = 320 psi. #2 @ 35 spm = 320 #1 @ 52 spm = 400 psi. #2 @ 52 spm = 400 08:00 - 00:00 16.00 DRILL P INT1 Held PTSM. Directional drill 9.875" hole from 11,319' to 12,500' with RSS, With 20,000# to 35,000# wob,Pump rate 600 gpm - 2,950 psi off bottom - 2,960 psi on bottom, 145 rpm - Torque on bottom = 15,000 Torque off bottom = 12,000, Pickup weight = 215,000#, Down weight = 135,000#, String weight = 163,000#, Back ream 90' on connections reducing flow rate to 450 gpm on the down stroke, minimizing ECD spikes. Have encountered several hard streaks in the HRZ that slowed ROP to 15 fph. Currently seeing between 50 - 120 fph. Pumped a 20 Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/7/2004 08:00 - 00:00 16.00 DRILL P INT1 bbl weighted sweep (13.3 ppg) at 12,371' saw a very slight increase in cuttings. ADT = 12.27 5/8/2004 00:00 - 12:00 12,00 DRILL P INT1 Held PTSM. Directional drill 9.875" hole from 12,500' to 13,180' with RSS, With 30,000# wob,Pump rate 595 gpm - 2,940 psi off bottom - 2,970 psi on bottom, 145 rpm - Torque on bottom = 15,000 Torque off bottom = 14,000, Pickup weight = 230,000#, Down weight = 150,000#, String weight = 175,000#, Back ream 90' on connections reducing flow rate to 450 gpm on the down stroke. Calculated ECD 11,96, actual 12.30. Began the 2 deg/100 turn at 12,400' no problems achieving required turn rate.Top of Kingak @ 12,720' md. Limit ROP through shale at no more than 100 fph. ADT = 9.22 12:00 - 00:00 12.00 DRILL P INT1 Held PTSM, Directional drill 9.875" hole from 13,180' to 13,900' with RSS, With 35,000# wob, Pump rate 593 gpm - 3,010 psi off bottom - 3,090 psi on bottom, 140 rpm - Torque on bottom = 17,000 to 18,500 Torque off bottom = 15,500, Pickup weight = 240,000#, Down weight = 148,000#, String weight = 182,000#, Due to the increase in rotary torque, the maximum rpm that can be achieved with torque between 16,000 to 18,000 is 140 rpm. During the last 24 hrs no sweeps were pumped, Added 697 bbls water to reduce low gravity solids and MBT, Mix chemicals and Bar to maintain mud properties, ran centrifuge for 10 hrs. Calculated clean hole ECD has remained 11.96, actual 12.30 ADT = 8.65 5/9/2004 00:00 - 19:00 19.00 DRILL P INT1 Held PTSM, Directional drill 9.875" hole from 13,900' to 14,811' with RSS, With 35,000# - 40,000# wob, Pump rate 593 gpm - 3,030 psi off bottom - 3,060 psi on bottom, 140 rpm - Torque on bottom = 19,000 Torque off bottom = 16,000, Pickup weight = 265,000#, Down weight = 153,000#, String weight = 190,000#. Had some rough drilling at 14,425' rotary torque increased from 17,000 ftllbs to 19,000 to 20,000 ftllbs, Geologist confirmed that we had crossed a fault @ 14,418' Increased bit weight from 35k to 40k, Did not pump any sweeps during the last 19 hrs of drilling, Clean hole ECD has remained 11.94 to 11.97 actual 12,31 Added 552 bbls of water to mud system, to keep MBT and low gravity solids down. Ran Centrifuge for 15 hrs. AT 14,811' stopped drilling to circulate up sample for Geologist. ADT = 14.88 19:00 - 21 :00 2.00 DRILL P INT1 Circulate up sample @ 14,811' pump rate 600 gpm @ 3120 psi, Rotating 145 rpm, with 15,000 ftllbs torque, reciprocating full stand, recovered sample geologist requested drilling another 5' 21 :00 - 21 :30 0.50 DRILL P INT1 Drill from 14,811 to 14,816' With 40,000# wob, Pump rate 593 gpm - 3,080 psi off bottom - 3,120 psi on bottom, 140 rpm - Torque on bottom = 19,000 Torque off bottom = 16,000, Pickup weight = 265,000#, Down weight = 150,000#, String weight == 190,000#. ADT .5 21 :30 - 22:30 1.00 DRILL P INT1 Circulate Bottoms up pump rate 600 gpm @ 3100 psi, Rotating 145 rpm, with 15,000 ftllbs torque, reciprocating full stand. After recovering sample Geologist confirmed TD @ 14,816' 22:30 - 00:00 1,50 DRILL P INT1 Monitor well, POH from 14,816' to 12,828' hole taking proper fill, no tight spots. 5/1 0/2004 00:00 - 02:00 2,00 DRILL P INT1 Held PTSM, POH from 12,828' started pulling tight @ 12,750' Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 4/24/2004 5/25/2004 Spud Date: 4/27/2004 End: 5/25/2004 5/10/2004 00:00 - 02:00 2.00 DRILL P INT1 10,000# to 25,000# over normal drag, work pipe back through tight spots, Pulling back through wiped area, tight spots were gone, Continue pulling and working pipe out of the hole, hole taking proper fill. From 11,920 to 11,850 had a increase in drag 50,000# over, worked back down, took an additional 25,000# to get back through this spot, normal down weight at this point is 130,000#, From 11,850' to 11,222' pulled smooth. Top of the Kingak shale @ 12,857' Top of the HRZ @ 11,835'. Recorded Torque and drag parameters every 10 stds. 02:00 - 04:30 2.50 DRILL P INT1 RIH From 11,222' to 14,707' no problem going in the hole, fill pipe as needed, Circulate and ream last stand to bottom from 14,707' to 14,816' no fill. 04:00 - 08:00 4.00 DRILL P INT1 Pump 25 bbl sweep weighted to (13.4 ppg) at 600 gpm with 3150 psi rotating 140 rpm with 19,000 ftIlb torque, ECD 12,33, When sweep came back, had a 75% increase in cuttings across shakers, Circulated additional bottoms up, torque dropped from 19,000 ftIlbs to 17,000 ftIlbs, ECD dropped from 12,33 to 12.10. 08:00 - 12:00 4,00 DRILL P INT1 Held PJSM. Monitor well, POH from 14,816' to 11,498' Pump dry job. No problem, 12:00 - 15:00 3.00 DRILL P INT1 Held PTSM. Continue POH from 11,498' @ 9,235' Pulled 50-75K over, worked through area twice before it cleaned up. Had another tight spot from 8,455' to 8,380' pulled 50k over, worked area until clean, Continued POH to 10.75" shoe, from 8,380 to 4700' had no hole problems. 15:00 - 16:00 1.00 DRILL P INT1 Circulate bottoms up at shoe, Pump rate 525 gpm @ 1,475 psi, rotating 100 rpm, reciprocate string one full stand, ECD 12,6, had a 75% increase in cuttings at bottoms up. ECD dropped to 12.12 16:00 - 18:00 2.00 DRILL P INT1 Held PJSM. POH Laying down 5' DP, (Lay down Ghost reamer 1" under gauge). Monitor well at BHA. 18:00 - 20:30 2.50 DRILL P INT1 Held PJSM. Lay down BHA, Bit was rung out. ( see pictures) Both string stabalizers were 1/8" under gauge, the bit was in gauge. One of the three pistons that operate the RSS was washed out. 20:30 - 21 :30 1.00 CASE P INT1 Clean floor, lay down unnecessary drilling tools pull wear ring, and Install test plug 21 :30 - 23:30 2.00 CASE P INT1 Held PJSM, Change top rams to 7.625" and test door seals to 3,500 psi. Pull test plug. 23:30 - 00:00 0.50 CASE P INT1 Rig up 7.625" Casing equipment, and Franks fill up tool 5/11/2004 00:00 - 00:30 0.50 CASE P INT1 Held PTSM, Continue Rigging up casing equipment. 00:30 - 01 :00 0.50 CASE P INT1 Held PJSM, With rig crew Co. Rep and Toolpusher. 01:00 - 23:15 22.25 CASE P INT1 Make up 7.625" 29,7# L-80 BTC-M shoe and float joints baker lock first two connections, check floats and RIH with 7.625" Intermediate casing as-per running order. Makeup torque 8,000 ftllbs. Filling every joint, Breaking ciculation every 10 Jts, circulating 3 Jts down every 35 jts. run & recording up and down weights to compare with Casing Running Model. Total 358 jts + 2 ea. Pup Jts Run. Final up weight = 380K wi pumps. Final down weight 155K. Tagged bottom @ 14,816' & PIU 2 ft, to set shoe @ 14,814'. No Mud losses. 23:15 - 00:00 0.75 CASE P INT1 Stage pumps up to 7 BPM. w/ pressure @ 1200 psi. 100 % Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/11/2004 23:15 - 00:00 0.75 CASE P INT1 Returns. 5/12/2004 00:00 - 01 :00 1.00 CEMT P INT1 Circulate Full Bottoms Up @ 7 BPM pressure dropped from 1200 psi to 1100 psi. No Losses, 01 :00 - 02:00 1.00 CEMT P INT1 RID Franks Fill-Up Tool & RIU Cement head. 02:00 - 03:15 1.25 CEMT P INT1 Continue Circulating & Conditioning Mud & Hole. 7BPM @ 1000 psi. Held PJSM wi Crew & Dowell. YP down to 15, Vis @ 45. No Losses. 03:15 - 07:15 4.00 CEMT P INT1 Switch to Dowell & Cement as follows: Pump 5 BBls Water & Test Lines to 3500 psi. Pump 60 Bbls. 11.8 ppg Batch Mixed MudPush @ 5 BPM Drop Bottom Plug Mix & Pump 392 BBls.(1054 sks), 12.5 ppg, "G" Slurry wi 2.09 cU.fVsk yield @ 6,5 BPM Pump 38 bbls ( 162 sks), 15.8 ppg Batch Mixed "G" Slurry w/ 1.2 cU.fVsk yield @ 6 BPM Drop Top Plug & Chase w/ 5 BBls water from Dowell to clear Lines. Switch to rig pump & displace wI 682 Bbls, 11.3 ppg Mud. @ 7 BPM. Began losing mud with 560 Bbls displacement away 100% Returns to that point. Staged pump down to 2 BPM Continued dispacement with final 10 Bbls Water. Bumped Plug w/2000 psi. - 65 bbls mud lost during final 132 Bbls of Displacement. Bleed pressure off & Check Floats - OK. 07:15 - 10:00 2,75 CASE P INT1 R/D Cement Head & Casing Slips. Pump Water out of casing to cut point. Drain BOP Stack, Remove Riser, N/D stack & P/U Same. 10:00 - 12:00 2.00 CASE P INT1 Install Slips with 193,000 Lbs. Tension on Casing String. Cut & Dress 7 5/8" Casing with Cameron WACHS Cutter. Clean out Packoff Bowl. 12:00 - 14:30 2.50 CASE P INT1 Install 7 5/8" Packoff, N/U BOP Stack. Test Packoff to 3800 psi. - OK. NIU Secondary kill Line to Annulus. 14:30 - 17:00 2.50 CASE P INT1 UD Cut -Off & Pup Jt. RID 7 5/8" running equip. Change out Top Rams to 31/2" X 6" Variables. Change out Bails & Install Riser. 17:00 - 21 :00 4.00 CASE P INT1 Test BOPE to 250 psi Low & 4000 psi High - Annular to 3500 psi. Witness of Test waived by Chuck Scheve, AOGCC. 21 :00 - 23:00 2.00 CASE P INT1 Change out Saver Sub on Top Drive to 4" HT-40. Test Upper & lower IBOP Valves to 250 Low & 4000 psi High. SIMOPS : Performe LOT on 103/4" X 7 5/8" Annulus- 11.33 ppg Mud. - 3331 TVD - 1080 psi Surface pressure = 17.59 ppg. EMW, LOT. Proceded with Injectivity-Injected 93 bbls 11.3 ppg Mud - Final - 2 BPM @ 1450 psi. 23:00 - 00:00 1.00 CASE P INT1 RIU Open Mouse Hole by Iron Roughneck & start UD 5" DP from Derrick, 5/13/2004 00:00 - 08:30 8.50 DRILL P INT1 Lay down 5" DP from Derrick. Clear rig floor of tools and clean up. SIMOPS: Freeze protect 103/4" X 7 5/8" annulus. Pump 25 bb112.9 ppg mud followed with 97 bbl dead crude oil at 2 BPM Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/13/2004 00:00 - 08:30 8,50 DRILL P INT1 with 1190 psi. 08:30 - 12:00 3.50 DRILL P PROD1 Change out drilling line. Spool all old line onto drum while spooling new line into derrick. Remove old line from from drum to metal dumpster for disposal. 12:00 - 13:00 1.00 DRILL N SFAL PROD1 New (Installed after BOP test yesterday) Lower IBOP I Saver Sub was found to have galled threads after breaking out 10 ft. HT-40 Pup Jt. Changed out same. 13:00 - 18:30 5.50 DRILL P PROD1 PIU 126 jts 4", 15.7#, S-135 DP from Shed. POH & stand back same. 18:30 - 20:30 2.00 DRILL P PROD1 P/U & M/U 6 3/4" BHA # 5 wi 1.83 Deg. Standard Motor 20:30 - 00:00 3,50 DRILL P PROD1 RIH P/U 132 Jts, 4" ,14#, S-135 DP. Rabbit DP while PIU, ShallowTestMWD @ 1184'. 5/14/2004 00:00 - 13:30 13.50 DRILL P PROD1 RIH with 63/4" drilling BHA. Pick up 4",15.7#, S-135 Drill pipe. Take series of 5 check shot surveys from 3,300' to 3,800', 6,500' to 7,000',9,650' to 10,030'. Continue picking up drill pipe and RIH to 12,490'. 13:30 - 14:00 0.50 DRILL P PROD1 RIH with Stands from Derrick to 14,205'. 14:00 - 16:30 2,50 DRILL P PROD1 Take check shot surveys from 14,225' to 14,600'. MAD Pass from 14,592 to 14,688. Wash and ream down, tag plug on Float Collar at 14,727'. 16:30 - 17:30 1.00 CASE P INT1 Rig up and test 7 5/8" Casing to 3,500 psi. Hold and chart for 30 minutes. Rig down and blow down lines. 17:30 - 19:00 1.50 DRILL P PROD1 Drill Plugs, Float collar Cement & Shoe to 14,814'. Clean out rat hole to 14,816', 245 GPM @ 1920 psi. 40 RPM with Rotary Torque 12, 800 to 15,400 ftllbs. 19:00 - 21 :00 2.00 DRILL P PROD1 Pump 20 bbl. water Flush followed by 80 bbl Hi - Vis sweep with 5 drums of EP MudLube, immediately follow with 8.4 ppg FloPro Mud pumping at 280 GPM with 1900 psi. Torque reduced to 7000 to 6500 ftllbs after EP Mud Lube treatment. 21 :00 - 21 :30 0.50 DRILL P PROD1 Drill ahead to 14,828'. Lost returns and noted 600 psi pump pressure loss from 1900 psi to 1300 psi. Pull bit back into 7 5/8" casing shoe, 21 :30 - 23:00 1.50 DRILL N DPRB PROD1 Keep hole full by circulating over the top from trip tank with fill up pump while mixing Calcium Carbonate Pill with 10 Ibs/bbl of Safe Carb 250 and 10 Ibs/bbl of Safe Carb 40. Losses slowed from 17 to 10 BPH. 23:00 - 00:00 1.00 DRILL N DPRB PROD1 Pump and spot 30 Bbl. 20 Ibs I bbl Calcium Carbonate Pill. 5/15/2004 00:00 - 00:30 0.50 DRILL N DPRB PROD1 Circulate over top of hole with fill up pump and monitor losses. Static 2 BPH losses. 00:30 - 01 :00 0.50 DRILL N DPRB PROD1 POH above LCM pill to 14,305'. 01 :00 - 01 :30 0.50 DRILL N DPRB PROD1 Break circulation and stage pumps up to 3 BPM / 800 psi. 120 BPH Losses, Stop circulating with 30 bbllosses. 01 :30 - 02:00 0.50 DRILL N DPRB PROD1 RIH to 14,828', Build 60 Lbs I Bbl LCM pill with 30 ppb of Safe Carb 20 and 30 ppb Safe Carb 40. 02:00 - 03:30 1.50 DRILL N DPRB PROD1 Pump 30 bbls of 60 Lb I Bbl Calcium Carbonate pill @ 2 BPM. 03:30 - 05:00 1.50 DRILL N DPRB PROD1 Circulate over top of hole with fillup pump monitor losses. Static 6 BPH losses. 05:00 - 05:30 0.50 DRILL N DPRB PROD1 POH above LCM pill to 14,305'. 05:30 - 06:00 0.50 DRILL N DPRB PROD1 Break circulation and stage pumps up to 2 BPM I 635 psi. 6 BPH Losses. Total Losses to this point = 300 Bbls. 06:00 - 06:30 0.50 DRILL N DPRB PROD1 RIH to 14,828'. 06:30 - 00:00 17.50 DRILL P PROD1 Directional Drill 6 3/4" Hole from 14,828' to 15,101'. Drlg @ 280 GPM & 2340 psi., WOB = 20 to 30K, Torque on Bottom = 8 to Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/15/2004 06:30 - 00:00 17.50 DRILL P PROD1 10K, Off bottom = 8 to 9K, PIU Wt = 190K, Dn. Wt. = 120K, Rot Wt. = 155K. Fluid losses while drilling = 302 Bbls, Adding Calcium Carbonate (4sx/hr 40 & 4 sx/hr 250) to help control losses. At bottom of Sag River Sand Pumped 25 bbl LCM sweep with 10 ppb Safe Carb 250,10 ppb Safe Carb 40,10 ppb G-Seal, 5 ppb Mix II Fine, 5 ppb Mix II Medium and 5 ppb Nut plug Medium. Calculated ECD = 9.39 ppg., Actual ECD = 9.62 ppg, AST = 7.28 Hrs, ART = 0.68 Hrs. Noted gas at surface while drilling the Shublik formation at 14,862'. Mud weight cut from 8.4 ppg to 8.2 ppg. Flow check on connections, well not flowing. Gas gradually decreasing. 5/16/2004 00:00 - 05:30 5.50 DRILL P PROD1 Directional Drill 6 3/4" Hole from 15,101' to 15,183', Drlg @ 280 GPM & 2400 psi., WOB = 20 to 30K, Torque on Bottom = 10 to 12K, Off bottom = 8 to 9K, P/U Wt = 200K, Dn. Wt. = 125K, Rot Wt. = 155K. 05:30 - 06:00 0.50 DRILL P PROD1 Work pipe after connection, restricted pipe movement, Hi Torque & OverpulL 06:00 - 07:30 1.50 DRILL P PROD1 Backream to shoe in attempt to clean up hole. 07:30 - 08:00 0.50 DRILL P PROD1 Service Top Drive& Crown, 08:00 - 09:30 1.50 DRILL P PROD1 Circulate Bottoms Up @ Shoe 275 GPM w/40 RPM. 09:30 - 10:00 0.50 DRILL P PROD1 RIH to 15,173', Ream to bottom @15,183'. 10:00 - 13:15 3,25 DRILL P PROD1 Directional Drill 63/4" Hole from 15,183' to 15,210'.280 GPM @ 2400 psi. Unable to drill any further. Unable to rotate nor get any differential on bit. Pumped 25 bbl LCM pill with 5 ppb Safe Carb 250, 5 ppb Safe Carb 40, 5 ppb G-Seal, 16 ppb MI Seal Course, 2.5 ppb Mix II Fine, 2.5 ppb Mix II Medium and 2 ppb Nut plug Medium. 13:15 - 13:45 0.50 DRILL P PROD1 Pump out of Hole to Shoe @ 14,814. 13:45 - 15:00 1.25 DRILL P PROD1 Pump and spot on top of Sag River sand 50 bbl LCM pill with 2.5 ppb Safe Carb 250, 2.5 ppb Safe Carb 40, 2.5 ppb G-Seal, 24 ppb MI Seal Course, 1.25 ppb Mix 1/ Fine, 1.25 ppb Mix II Medium and 1.25 ppb Nut plug Medium. Added 2 Ibs Super Sweep fiber in LCM pill. 15:00 - 23:00 8.00 DRILL P PROD1 POH. Swabbing. Pump out of Hole to 7900'. Check - Still Swabbing. Continue pumping out of hole to 6180' 23:00 - 23:30 0,50 DRILL P PROD1 No longer Swabbing. Pump Slug. 23:30 - 00:00 0,50 DRILL P PROD1 POH. Hole taking correct displacement. Total Mud losses for Day = 402 BBls, 5/17/2004 00:00 - 02:30 2.50 DRILL P PROD1 POH, standing back all DP. Displacement OK. 02:30 - 04:00 1.50 DRILL P PROD1 Stand back flex collars. UD MWD, Motor Jars & Bit. 04:00 - 05:30 1.50 DRILL P PROD1 M/U New MWD w/AIM, Bit, Mud Motor wi 1.5 Deg bend, Orient, RIH wi flex collars & Jars. 05:30 - 08:00 2.50 DRILL P PROD1 RIH with the 44 stands of 4", 14# DP from derrick. 08:00 - 10:00 2.00 DRILL P PROD1 Rabbit, PIU & RIH with 69 Jts 4",15.7# DP from shed & RIH 10:00 - 13:30 3.50 DRILL P PROD1 Continue RIH with DP from Derrick to 14,791', filling pipe & breaking circulation every 3,000'. 13:30 - 14:45 1.25 DRILL P PROD1 Pump EP MudLube pill out of bit. 14:45 - 15:15 0,50 DRILL P PROD1 Service Top Drive & Blocks, Hook up Blower Hose. 15:15 - 17:00 1.75 DRILL P PROD1 Attempt to RIH could not pass 14,833'. Wash & Ream from Printed: 6/1/2004 9:23:27 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRlll+COMPlETE NABORS ALASKA DRilLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/17/2004 15:15 - 17:00 1,75 DRILL P PROD1 14,820' to 15,210' 280 GPM @ 2050 psi. MAD Pass from 15,150' to 15,180. EP Sweep came back & dumped in cutting box, 17:00 - 00:00 7,00 DRILL P PROD1 Directional Drill 6 3/4" Hole from 15,210' to 15,364, 294 GPM @ 2300 psi. WOB = 6K to 10K, Rotate briefly @ 60 RPM. Torque on bottom = 8.5K, off bottom = 7K. AST = 3.26 Hrs. ART = 0.06 Hrs. Losses while drilling averaging 11 Bbl/ Hr. Calculated ECD = 9.4 ppg. Actual ECD = 9.63 ppg. 5/18/2004 00:00 - 00:00 24.00 DRILL P PROD1 Directional Drill 63/4" Hole from 15,364' to 16,174. 283 GPM @ 2260 psi. WOB = 6K to 15K. Torque on bottom = 9 K, off bottom = 7,5 K. AST = 13.68 Hrs. ART = 2.71 Hrs. Losses while drilling averaging 15 Bbl I Hr. Calculated ECD = 9.32 ppg. Actual ECD = 9.62 ppg. Well breathing back slightly on connections, Pumped Hi Vis Sweep @ 15,970'. Very little sand back over shakers. 5/19/2004 00:00 - 00:00 24,00 DRILL P PROD1 Directional Drill 63/4" Hole from 16,174 to 16,956'. 283 GPM @ 2360 psi. WOB = 8K to 25K. Torque on bottom = 9.5 K, off bottom = 8 K. AST = 12.7 Hrs. ART = 4.04 Hrs. Losses while drilling averaging 13 Bbl I Hr. Calculated ECD = 9.37 ppg. Actual ECD = 9.63 ppg. Well breathing back slightly on connections. Geosteering for T5. Have hit all geological targets, 5/20/2004 00:00 - 00:00 24,00 DRILL P PROD1 Directional Drill 6 3/4" Hole 16,956' to 18,137', 286 GPM @ 2540 psi. WOB = 10K to 14K. Torque on bottom = 10 K, off bottom = 9 K. AST = 8,26 Hrs. ART = 4.73 Hrs. Losses while drilling averaging 17 Bbl I Hr. Calculated ECD = 9,55 ppg. Actual ECD = 9.85 ppg. Well breathing back slightly on connections. Geosteering to rD Polygon, Have hit all geological targets. Pumped Hi-Vis Sweeps @ 17,030', 17,565', & 18,027'. 10% to 20% increase in sand over shakers wi sweeps. PIU Wt = 205K, DN WI. = 115K, ROT WI. = 157K. 5/21/2004 00:00 - 08:00 8.00 DRILL P PROD1 Directional Drill 63/4" Hole from 18,137' to 18,584', TD per Geologist.282 GPM @ 2540 psi. WOB = 12K to 18K. Torque on bottom = 10.5 K, off bottom = 8.5 K. AST = 3.3 Hrs. ART = 1.63 Hrs. Losses while drilling averaging 21 Bbl I Hr. Calculated ECD = 9.67 ppg. Actual ECD = 9.96 ppg. Well breathing back slightly on connections, Have hit all geological targets. Pumped Hi-Vis Sweeps @ 18,328' & 18,584. 10% to 20% increase in sand over shakers w/ sweeps, P/U Wt = 200K, DN WI. = 115K, ROT WI. = 155K. 08:00 - 10:00 2.00 DRILL P PROD1 Circulate Hi-Vis Sweep @ 280 GPM & 2130 psi. Rotate @ 100 RPM. 10:00 - 15:45 5.75 DRILL P PROD1 Backream to Shoe 14,814'. Had to work through some tight spots. Worst was "Fracture" @ 14,828'. 15:45 - 18:00 2,25 DRILL P PROD1 Circulate Hi-Vis sweep in Casing @ 290 GPM & 1960 psi. Slight increase of sand over shakers. 18:00 - 19:30 1.50 DRILL P PROD1 Monitor Well - Breathed back 5 1/2 Bbls then slowed to trickle. Serviced Top Drive. Slip & Cut Drilling Line 124 ft. 19:30 - 21:30 2.00 DRILL P PROD1 RIH Had to ream through 14,828' & 14,853'. Reamed through twice both ways. Third time went through without pumps - OK. Rest of Hole Slick - No Problems, Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 5/21/2004 21 :30 - 00:00 2.50 DRILL P PROD1 CBU & Pump Hi-Vis Sweep @ 284 GPM & 2380 psi. Rotating @ 100 RPM w/ 8000 ft/lbs of Torque. 5/22/2004 00:00 - 00:30 0,50 DRILL P PROD1 Complete Circulating Hi-Vis Sweep. Some sand over shakers - did not 'unload'. 00:30-01:15 0.75 DRILL P PROD1 Displace drill String with 180 Bbls. new FloPro Mud wi lubes to be used as a Liner running pill. 01:15 - 05:00 3,75 DRILL P PROD1 POH pumping to displace new mud into wellbore. Pumping @ 2 BPM, Pump to 15,100'. Pull last two stands dry past Fracture @ 14,828' into casing with no drag. Hole in excellent condition. 05:00 - 06:30 1.50 DRILL P PROD1 Circulate Hi-Vis Sweep. 280 GPM, 2050 psi. very little over Shakers. 06:30 - 07:00 0.50 DRILL P PROD1 Monitor Well while Servicing Top Drive & Crown. Well breathed back 1.5 Bbls first 5 minutes diminishing to 0,2 Bbl for 5 minutes after 30 minutes monitoring. 07:00 - 08:00 1.00 DRILL P PROD1 Drop Rabbit & POH Slowly from 14,790' to 14,121'. 08:00 - 08:30 0.50 DRILL P PROD1 Pump Slug, Blow down Top Drive & remove Blower Hose, 08:30 - 18:30 10.00 DRILL P PROD1 POH to 3,988'. UD 120 Jts. 4", 14# DP. 18:30 - 20:30 2.00 DRILL P PROD1 UD BHA #6, Clear Floor. 20:30 - 21 :30 1.00 CASE P COMP R/U to run 4.5" Slotted Liner. PJSM with Crew & Baker Hands. 21 :30 - 00:00 2.50 CASE P COMP Run 4,5", 12.6#, L-80, IBT-M Slotted Liner as per Program. 5/23/2004 00:00 - 01 :30 1.50 CASE P COMP Run Total 72 Jts. 4.5" Slotted Liner + 20 Jts 4,5" Solid Liner as per Program, 01 :30 - 02:00 0.50 CASE P COMP Dress & MIU Baker 'HMC' Liner Hanger & 'ZXP' Liner Top Packer w/ Tie Back Extension. 02:00 - 02:30 0.50 CASE P COMP CIO Elevators. R/D power tongs & Liner Equipment. Break ciculation & get Up & Down Weights. 17 Bbls Mud lost while running Liner. PIU Weight + 65K, Down Weight = 55K, 02:30 - 11 :30 9.00 CASE P COMP RIH with Liner on DP. Running speed = 90 ft I min. Break Circulation every 35 stands, RIH to Setting Depth @ 18,502'. No Problems in Open Hole. P/U Wt. = 210K Slack Off Wt. = 125K Losses Running Liner on DP to TD = 47 Bbls. 11 :30 - 13:30 2.00 CASE P COMP Break Circulation & Stage pumps up to 4 BPM @ 950 psi. Shut down & Drop Baker 29/32" Setting Ball. Pump ball down to seat. Pressure up to 2500 psi to set Liner Hanger. Slack off to insure Set. Pressure up to 3500 psi to set 'ZXP' Packer. Attempt to test backside - No Success. Pressure up Liner to 4000 psi & shear ball seat. Release from Hanger. 13:30 - 17:00 3.50 CASE P COMP Displace FloPro Mud with the following: Pump 200 BBls Seawater Pre-flush followed by 8 6 ppg., 2% KCL Brine until Clean Brine at Surface. Monitor Well then Pump Slug. 7 Bbls Fluid lost to Formation. 17:00 - 00:00 7.00 CASE P COMP POH Laying Down all 4" DP. 5/24/2004 00:00 - 03:30 3.50 CASE P COMP POH Laying Down all 4" DP - 460 Jts Total. UD Baker Hydraulic Setting Tool. 03:30 - 06:00 COMP Pull Wear Bushing. Change out Bails & Elevators, RIU Dual Tongs, Compensator & Computer for TorquefTurn, Make Dummy Run with Hanger & Landing Jt. PJSM with All Hands. 06:00 - 00:00 COMP Run 4 1/2",12.6#, 13CR, VAM TOP Tubing with Completion Equipment as per Program. 320 Jts ran at Tour Change. 101 Bbls Brine lost to hole past 24 Hrs. 5/25/2004 00:00 - 01 :30 COMP Complete Running 4.5" Completion String (342 Jts,). PIU Wt. = Printed: 6/1/2004 9:23:27 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: DELETE P-27 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 4/24/2004 Rig Release: 5/25/2004 Rig Number: Spud Date: 4/27/2004 End: 5/25/2004 02:30 " 03:30 1.00 COMP 03:30 " 06:30 COMP 06:30 - 07:00 COMP 07:00 - 10:00 COMP 10:00 - 10:30 0.50 RUNCO COMP 10:30 - 11 :30 1.00 BOPSU P COMP 11 :30 - 14:30 3,00 WHSUR P COMP 14:30 - 15:30 1.00 WHSUR P COMP 15:30 - 17:30 2.00 WHSUR P COMP 17:30 - 19:00 1.50 WHSUR P COMP 19:00 - 20:00 1.00 WHSUR P COMP 150K, Slack Off Wt. = 105K. Space out 3+ ft. into Tie Back Receptacle. UD Jts #343 & #344. PIU 2 pup Jts and position below Jt # 342. M/U Tubing Hanger & Landing Jt. R/U XO, TIW and circ Hose to Ldng. Jt. PJSM with all Hands. Test lines to 3000 psi. Reverse Circulate, spotting 237 bbls. of Corrosion inhibited Brine Followed by 145 bbls brine with no addatives down 4.5" X 75/8" Annulus. Pump @ 3 BPM & 290 psi. Land Tubing Hanger and RILDS. Drop 1 7/8" ball and rod, set packer and test tubing to 4,000 psi. for 30 min. Bleed off tubing pressure to 2,000 psi. pressure up on annulus to 3,500 psi for 30 min. Bleed annulus pressure to zero, and tubing pressure to zero, Pump down annulus to shear DCk valve, sheared with 2,700 psi. pump 2 bbls through valve. Blow down lines, lay down landing joint, rig down casing equipment, Install two TWC, and test to 1,000 psi. from below. Held PJSM, Nipple down riser and BOP, Nipple up 4 1/8" 5M production tree and adapter flange, test to 5,000 psi. Held PJSM, Rig up Lubricator and pull TWC, Held PJSM, Rig up Little Reds, and Pump 105 bbls diesel down 4.5" X 7,625" annulus at 3 bpm. final circulating pressure 1650 psi. U- Tube diesel from annulus to tubing. Install BPV in tubing hanger. Test to 1000 psi from below. RID Little Red's equipment. Secure well. Release Rig @ 20:00 hrs 5/25/2004 Printed: 6/1/2004 9:23:27 AM ò Comments Suface Tie-In Last Gyro Survey Schlumberger P-27 Survey Report Survey I DLS Computation Method: Minimum Curvature I Lubinski Vertical Section Azimuth: 250.740· Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference Elevation: 80.1 ft relative to MSL Sea Bed 1 Ground Level Elevation: 51.80 ft relative to MSL Magnetic Declination: 25.121· Total Field Strength: 57576.504 nT Magnetic Dip: 80.811" Declination Date: May 13, 2004 Magnetic Declination Model: BGGM 2003 North Reference: True North Total Corr Mag North -> True North: +25.121· Local Coordinates Referenced To: Well Head Report Date: 21,May-04 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure 1 Slot: P-PAD 1 P-27 Well: P-27 Borehole: P-27 UWl/API#: 500292320300 Survey Name 1 Date: P-27 1 May 21, 2004 TortI AHDI DOl 1 ERD ratio: 410.327· 115055.25 ft/7.103/1.663 Grid Coordinate System: NAD27 Alaska State Planes. Zone 04, US Feet Location Lat/Long: N 70.26389783, W 148.93894345 Location Grid NIE YIX: N 5947217.720 ftUS, E 631237.610 ftUS Grid Convergence Angle: <{¡.99874096· Grid Scale Factor: 0.99991957 e Survey Tool Model 475.59 4.80 286,36 395.17 475.27 12.96 14.30 0.64 -13.96 2.13 2.04 9.11 5947218.11 631223.65 N 70.26389957 W 148.93905626 BP _MWD+IFR+MS 559.88 6.67 289.58 479.03 559.13 19.64 22.72 3.27 -21.95 2.25 2.22 3.82 5947220.61 631215.61 N 70.26390677 W 148.93912091 BP _MWD+IFR+MS 654.74 9.21 272.81 572.99 653.09 30.97 35.73 5.49 -34.73 3.60 2.68 -17.68 5947222.60 631202.79 N 70.26391283 W 148.93922419 BP _MWD+JFR+MS 744.31 11.53 268.58 661.09 741.19 46.14 51.85 5.62 -50.84 2.72 2.59 -4.72 5947222.45 631186.68 N 70.26391318 W 148.93935443 BP _MWD+IFR+MS 833.95 14.41 269.21 748.44 828.54 65.25 71.97 5.24 -70.95 3,22 3.21 0.70 5947221.73 631166.58 N 70.26391216 W 148.93951702 BP _MWD+IFR+MS 926.05 16.60 268.83 837.18 917.28 88.63 96.58 4.82 -95.57 2.38 2.38 -0.41 5947220.87 631141.98 N 70.26391099 W 148.93971600 BP _MWD+IFR+MS 1020.78 17.50 268.97 927,74 1007.84 115.02 124.36 4.29 -123,34 0.95 0.95 0,15 5947219.86 631114.23 N 70.26390954 W 148.93994049 BP _MWD+IFR+MS 1114.77 20.62 270.48 1016.57 1096.67 144.03 155.05 4.17 -154.02 3.36 3.32 1.61 5947219.21 631083.55 N 70.26390922 W 148.94018855 BP _MWD+IFR+MS 1208.52 23.14 270.77 1103,56 1183.66 176.88 189.98 4.56 -188.96 2.69 2.69 0.31 5947218.98 631048.62 N 70.26391027 W 148.94047094 BP _MWD+IFR+MS 1302.72 24.26 270.32 1189.81 1269.91 212.50 227.84 4.91 -226.82 1.20 1.19 -0.48 5947218.68 631010.76 N 70.26391124 W 148.94077700 BP _MWD+IFR+MS 1397.08 26.72 269,28 1274.98 1355.08 250.88 268.45 4.75 -267.42 2.65 2.61 -1.10 5947217.81 630970.17 N70.26391081 W148.94110523 BP_MWD+IFRe 1490.90 30.02 267.66 1357.53 1437,63 293,35 313.02 3.53 -311.97 3.61 3.52 -1.73 5947215.81 630925.65 N 70.26390746 W 148.94146539 BP _MWD+IFR 1584.77 33.23 266.43 1437.45 1517.55 340.59 362.23 0.97 -361.12 3.49 3.42 -1.31 5947212.40 630876.56 N 70.26390046 W 148.94186268 BP _MWD+IFR+MS 1679.35 37.36 266.50 1514.62 1594,72 393.18 416.87 -2.40 -415.65 4.37 4.37 0.07 5947208.08 630822.10 N 70.26389125 W 148.94230350 BP _MWD+IFR+MS 1773.12 38,66 265.54 1588.51 1668.61 448.88 474.61 -6.41 -473.25 1.52 1.39 -1.02 5947203.06 630764.58 N 70.26388027 W 148.94276913 BP _MWD+IFR+MS 1867,01 43.32 263.72 1659.36 1739.46 508,65 536.17 -12.22 -534.54 5.12 4.96 -1.94 5947196.19 630703.41 N 70.26386440 W 148.94326457 BP _MWD+IFR+MS 1961.42 45.41 262.25 1726.85 1806.95 573.16 602,18 -20.30 -600.05 2.47 2.21 -1.56 5947186.97 630638.05 N 70.26384232 W 148.94379414 BP _MWD+JFR+MS 2055.49 46.95 261.19 1791.98 1872.08 639.79 670.05 -30.08 -667,21 1.83 1.64 -1.13 5947176.02 630571.08 N 70.26381558 W 148.94433705 BP _MWD+IFR+MS 2150.08 47.78 261.46 1856.05 1936.15 708.19 739.64 -40.57 -736.00 0.90 0.88 0.29 5947164.33 630502.49 N 70.26378689 W 148.94489314 BP _MWD+JFR+MS 2243.50 47.23 259.81 1919.16 1999.26 776.04 808.52 -51.78 -803,96 1.43 -0.59 -1.77 5947151.94 630434.74 N 70.26375626 W 148.94544250 BP _MWD+IFR+MS 2338.06 47.98 260.00 1982.92 2063,02 844.99 878.35 -64.02 -872,71 0.81 0.79 0.20 5947138.51 630366.22 N 70.26372280 W 148.94599826 BP _MWD+IFR+MS 2428.84 49.18 257.25 2042.98 2123.08 912.41 946.42 -77.45 -939.44 2.63 1.32 -3.03 5947123.91 630299,74 N 70.26368607 W 148.94653761 BP _MWD+IFR+MS 2522.58 54.56 255,68 2100.84 2180.94 985.75 1020.13 -94.74 -1011.09 5.89 5.74 -1.67 5947105.38 630228.41 N 70.26363882 W 148.94711679 BP _MWD+IFR+MS 2618.22 56.73 255.18 2154.81 2234.91 1064.43 1099.08 -114.61 -1087.50 2.31 2.27 -0.52 5947084.19 630152.37 N 70.26358452 W 148.94773445 BP _MWD+IFR+MS 2713.12 56.92 256,16 2206.74 2286.84 1143.57 1178.51 -134.26 -1164.46 0.89 0.20 1.03 5947063.19 630075.77 N 70.26353078 W 148.94835654 BP _MWD+JFR+MS SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( do31rt-546 ) Generated 6/4/2004 10:00 AM Page 1 of 7 P-27\P-27\P-27\P-27 Comments Survey Tool Model 2808.59 57.44 254.16 2258,49 2338.59 1223.56 1258.74 -154.82 -1242.00 1.84 0.54 -2.09 5947041.29 629998.60 N 70.26347460 W 148.94898338 BP _MWD+IFR+MS 2902,11 59.00 250.50 2307.75 2387.85 1303.00 1338.23 -178.96 -1317.72 3.72 1.67 -3.91 5947015.84 629923.32 N 70.26340861 W 148.94959543 BP _MWD+IFR+MS 2996.78 59.28 249.23 2356.31 2436,4 1 1384.26 1419.50 -206.93 -1394.02 1.19 0.30 -1.34 5946986.54 629847.52 N 70.26333215 W 148.95021215 BP _MWD+IFR+MS 3090.19 58.69 249.57 2404,44 2484.54 1464.29 1499.55 -235.10 -1468.96 0.70 -0.63 0.36 5946957.07 629773.10 N 70.26325516 W 148.95081786 BP _MWD+IFR+MS 3185.48 57.93 250.35 2454.50 2534.60 1545.36 1580.63 -262.89 -1545.13 1.06 -0,80 0.82 5946927.96 629697,43 N 70.26317920 W 148.95143355 BP _MWD+IFR+MS 3277,93 57.26 250.36 2504.04 2584.14 1623,41 1658.68 -289,13 -1618.64 0.72 -0,72 0.01 5946900,45 629624.39 N 70.26310747 W 148.95202772 BP _MWD+IFR+MS 3372.68 59.11 248.90 2553,99 2634.09 1703.91 1739.19 -317.16 -1694.11 2.35 1.95 -1.54 5946871.11 629549,43 N 70.26303084 W 148.95263773 BP _MWD+IFR+MS 3466.66 58.77 249.99 2602,48 2682.58 1784.39 1819.70 -345,43 -1769,48 1.06 -0.36 1.16 5946841.53 629474.56 N 70.26295357 W 148.95324699 BP _MWD+IFR+MS 3560,47 57.08 249.14 2652.30 2732.40 1863.86 1899.19 -373.18 -1843.97 1.96 -1.80 -0.91 5946812,49 629400.58 N 70.26287772 W 148.95384904 BP _MWD+IFR+MS 3655.20 58.84 248,00 2702.55 2782.65 1944,10 1979.48 -402.52 -1918.71 2.12 1.86 -1.20 5946781.85 629326.36 N 70.26279750 W 148.95445315 BP _MWD+IFR+MS 3748,40 58.95 248.27 2750,70 2830.80 2023.81 2059.28 -432.24 -1992.77 0.27 0.12 0.29 5946750.85 629252.84 N 70.26271626 W 148.95505173 BP _MWD+IFR+MS 3842.88 58.56 249.02 2799.71 2879.81 2104.54 2140,06 -461.65 -2068.00 0.79 -0.41 0.79 5946720.13 629178.14 N 70.26263584 W 148.95565977 BP _MWD+IF. 3935.77 58.02 249.05 2848.53 2928.63 2183.52 2219.08 -489.93 -2141.79 0,58 -0.58 0.03 5946690.58 629104.86 N 70.26255854 W 148.95625619 BP _MWD+IF 4031.68 57.36 249.22 2899.80 2979.90 2264.55 2300.14 -518.80 -2217.54 0.70 -0.69 0.18 5946660.39 629029.64 N 70.26247961 W 148.95686838 BP _MWD+IF 4125,63 58.88 249,45 2949,41 3029.51 2344.30 2379.92 -546.95 -2292.18 1.63 1.62 0.24 5946630.95 628955.50 N 70.26240264 W 148.95747167 BP _MWD+IFR+MS 4219.39 58.63 250.06 2998.05 3078.15 2424.45 2460.08 -574.69 -2367.39 0.62 -0.27 0.65 5946601.90 628880.79 N 70.26232680 W 148.95807953 BP _MWD+IFR+MS 4312.87 58.36 251.02 3046.90 3127.00 2504,15 2539.78 -601.24 -2442.53 0.92 -0.29 1,03 5946574,05 628806.13 N 70.26225419 W 148.95868688 BP _MWD+IFR+MS 4407.23 57.67 251.26 3096.88 3176.98 2584.18 2619.81 -627.11 -2518.27 0.76 -0.73 0.25 5946546.86 628730.86 N 70.26218344 W 148.95929900 BP _MWD+IFR+MS 4500.63 59.14 251.77 3145.81 3225.91 2663.73 2699.37 -652.34 -2593.72 1.64 1.57 0,55 5946520.33 628655.87 N 70.26211447 W 148.95990880 BP _MWD+IFR+MS 4594.54 58.63 251.86 3194.34 3274.44 2744.11 2779.76 -677.43 -2670.10 0.55 -0.54 0.10 5946493.91 628579.94 N 70.26204585 W 148.96052615 BP _MWD+IFR+MS 4646.72 58.76 251.60 3221.45 3301.55 2788.69 2824.35 -691.40 -2712.44 0,49 0.25 -0.50 5946479.20 628537.86 N 70.26200762 W 148.96086831 BP _MWD+IFR+MS 4731.27 57.87 251.04 3265.86 3345.96 2860.63 2896.29 -714.44 -2780.60 1.19 -1.05 -0.66 5946454.98 628470.12 N 70.26194461 W 148.96141916 BP _MWD+IFR+MS 4826.21 59.36 250.40 3315.30 3395,40 2941,68 2977.34 -741.21 -2857.09 .1.67 1.57 -0,67 5946426.89 628394.10 N 70.26187141 W 148.96203743 BP _MWD+IFR+MS 4921,90 59.81 250.87 3363.75 3443.85 3024.20 3059.86 -768.57 -2934.95 0.63 0,47 0,49 5946398.18 628316.75 N 70.26179658 W 148.96266663 BP _MWD+IFR+MS 5018.34 59.62 250.52 3412.38 3492,48 3107,48 3143.14 -796.10 -3013.54 0.37 -0.20 -0.36 5946369.28 628238.65 N 70.26172128 W 148.96330183 BP _MWD+IFR+MS 5114.50 59.31 250.13 3461.24 3541.34 3190.30 3225.96 -823.99 -3091.53 0,48 -0.32 -0.41 5946340.04 628161.16 N 70.26164502 W 148.96393212 BP _MWD+IFR+MS 5208.27 59,41 249.79 3509.03 3589.13 3270.97 3306.64 -851.63 -3167.33 0.33 0.11 -0.36 5946311.08 628085.87 N 70.26156940 W 148.96454466 BP _MWD+IFR+MS 5303.93 59,41 249.92 3557,71 3637,81 3353.31 3388.99 -879.99 -3244.63 0.12 0,00 0.14 5946281.38 . 628009.07 N 70.26149183 W 148.96516945 BP _MWD+IFR+MS 5395.76 59.38 249.59 3604,46 3684.56 3432.33 3468.03 -907.34 -3318.79 0.31 -0.03 -0.36 5946252.75 627935.41 N 70.26141703 W 148.96576873 BP _MWD+IFR+MS 5491.64 58.81 250.21 3653,71 3733.81 3514.59 3550,29 -935.62 -3396.04 0.81 -0.59 0.65 5946223.13 627858.67 N 70.26133969 W 148.96639307 BP _MWD+IFR+MS 5586.22 58.06 250.63 3703.22 3783.32 3595.18 3630.88 -962.62 -3471.97 0.88 -0.79 0,44 5946194.81 627783.23 N 70.26126582 W 148,96700666 BP _MWD+IFR+MS 5679.95 57.94 251.59 3752.89 3832.99 3674.66 3710.37 -988.36 -3547.17 0.88 -0.13 1.02 5946167.77 627708,49 N 70.26119542 W 148.96761443 BP _MWD+IFR+MS 5772.59 57,92 252.30 3802.07 3882.17 3753.14 3788.87 -1012.69 -3621.81 0.65 -0.02 0.77 5946142.14 627634.30 N 70.26112885 W 148.96821761 BP _MWD+IFR. 5867.86 57.34 252.64 3853.08 3933.18 3833.57 3869.34 -1036.93 -3698.54 0.68 -0.61 0,36 5946116.58 627558,01 N 70.26106253 W 148.96883769 BP MWD+IFR 5962.23 57.26 253,34 3904.06 3984.16 3912.92 3948.75 -1060.16 -3774.48 0.63 -0.08 0.74 5946092.03 627482,49 N 70.26099896 W 148.96945138 BP _MWD+IFR+ 6058,40 57.68 254.29 3955.78 4035.88 3993.89 4029.83 -1082.76 -3852.35 0.94 0.44 0.99 5946068.08 627405.04 N 70.26093712 W 148.97008066 BP _MWD+IFR+MS 6152,24 57.33 254.63 4006.19 4086.29 4072,87 4108.98 -1103.96 -3928,60 0,48 -0.37 0.36 5946045.55 627329.17 N 70.26087908 W 148.97069692 BP _MWD+IFR+MS 6247.31 57.35 254.72 4057.50 4137.60 4152.72 4189.02 -1125.11 -4005.79 0.08 0.02 0.09 5946023.05 627252.37 N 70.26082118 W 148.97132074 BP _MWD+IFR+MS 6343.18 57,44 254.48 4109.16 4189.26 4233,30 4269.78 -1146.56 -4083,65 0.23 0.09 -0.25 5946000.25 627174.90 N 70.26076247 W 148.97194997 BP _MWD+IFR+MS 6437.79 57.05 254.34 4160.34 4240.44 4312.70 4349.34 -1167.94 -4160.29 0,43 -0.41 -0.15 5945977.54 627098.65 N 70.26070394 W 148.97256932 BP _MWD+IFR+MS 6532.51 56.99 254.12 4211.90 4292.00 4392.01 4428.80 -1189.54 -4236,76 0.20 -0.06 -0.23 5945954,62 627022.58 N 70.26064483 W 148.97318726 BP _MWD+IFR+MS 6627.53 57.55 254.38 4263.28 4343.38 4471.79 4508.73 -1211.24 -4313.69 0.63 0.59 0.27 5945931.59 626946.04 N 70.26058543 W 148.97380897 BP _MWD+IFR+MS 6721.70 57.20 254.62 4314.05 4394,15 4550.93 4588,05 -1232,43 -4390.12 0,43 -0.37 0.25 5945909.06 626870.00 N 70.26052741 W 148.97442659 BP _MWD+IFR+MS 6818.54 57,25 254,41 4366,47 4446.57 4632.18 4669,47 -1254.17 -4468.59 0.19 0.05 -0.22 5945885.96 626791.93 N 70.26046789 W 148.97506070 BP _MWD+IFR+MS 6914.19 56.93 253.67 4418.44 4498.54 4712.35 4749.77 -1276.25 -4545,79 0.73 -0.33 -0,77 5945862,54 626715.13 N 70.26040745 W 148.97568460 BP _MWD+IFR+MS 7007.52 57.00 252.67 4469.32 4549,42 4790,52 4828.01 -1298.90 -4620,68 0.90 0.08 -1.07 5945838.59 626640.65 N 70.26034544 W 148.97628978 BP _MWD+IFR+MS 7102.71 57.25 251.07 4521.00 4601.10 4870,44 4907.95 -1323.78 -4696.65 1,44 0.26 -1.68 5945812.39 626565.13 N 70.26027735 W 148.97690369 BP _MWD+IFR+MS SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) P-27\P-27\P-27\P-27 Generated 6/4/2004 10:00 AM Page 2 of 7 Comments Survey Tool Model 7481.92 58.66 247.84 4722.25 4802,35 5191.59 5229.34 -1440.27 -4996.14 0.49 0.49 -0.07 5945690.71 626267.75 N 70.25995857 W 148.97932362 BP _MWD+IFR+MS 7577.28 59.29 247.85 4771.40 4851.50 5273,20 5311.06 -1471.09 -5071.82 0.66 0.66 0.01 5945658.58 626192.62 N 70.25987424 W 148.97993515 BP _MWD+IFR+MS 7672.23 59.88 246.83 4819.47 4899.57 5354.94 5392.94 -1502.64 -5147,38 1.12 0.62 -1.07 5945625.72 626117.63 N 70.25978791 W 148.98054567 BP _MWD+IFR+MS 7767.68 60.32 246.11 4867.05 4947,15 5437.46 5475.69 -1535,67 -5223.24 0.80 0.46 -0.75 5945591.37 626042.36 N 70.25969752 W 148.98115864 BP _MWD+IFR+MS 7861,36 59.79 246.17 4913.81 4993.91 5518.37 5556.86 -1568.51 -5297.48 0.57 -0.57 0.06 5945557.25 625968.71 N 70.25960768 W 148.98175844 BP _MWD+IFR+MS 7954,56 59.13 246.31 4961.17 5041.27 5598.39 5637.13 -1600.85 -5370.95 0.72 -0.71 0.15 5945523.64 625895.82 N 70.25951918 W 148.98235202 BP _MWD+IFR+MS 8047.68 58.86 246.38 5009.14 5089.24 5677.97 5716.95 -1632.87 -5444.06 0.30 -0.29 0.08 5945490.35 625823.29 N 70.25943155 W 148.98294271 BP _MWD+IFR+MS 8140.16 58.63 246,18 5057,12 5137.22 5756,79 5796.00 -1664.67 -5516.43 0,31 -0.25 -0.22 5945457.29 625751.48 N 70.25934452 W 148.98352750 BP _MWD+IFR+MS 8234.04 58.09 246.37 5106.37 5186.47 5836.47 5875.93 -1696.83 -5589.61 0.60 -0.58 0.20 5945423.86 625678.89 N 70.25925652 W 148.98411867 BP _MWD+IFR+MS 8328.95 57.29 248.08 5157.10 5237.20 5916.53 5956,14 -1727.89 -5663.56 1.74 -0.84 1.80 5945391,53 625605.49 N 70.25917153 W 148.98471618 BP _MWD+IF. 8423.86 56.46 249.71 5208.97 5289.07 5995.97 6035.63 -1756.51 -5737.71 1.68 -0.87 1.72 5945361.62 625531.86 N 70.25909317 W 148.98531526 BP _MWD+IF 8517.19 55.92 250.26 5260.90 5341.00 6073,51 6113.17 -1783.05 -5810.57 0.76 -0.58 0.59 5945333.81 625459.48 N 70.25902051 W 148.98590396 BP _MWD+IFR+MS 8611.26 55.94 249.76 5313.60 5393.70 6151.43 6191.09 -1809.69 -5883.80 0.44 0.02 -0.53 5945305.90 625386.73 N 70.25894758 W 148.98649561 BP _MWD+IFR+MS 8704.18 55.97 249.40 5365.62 5445.72 6228.40 6268.09 -1836.56 -5955.95 0.32 0.03 -0.39 5945277.79 625315.06 N 70.25887404 W 148,98707859 BP _MWD+IFR+MS 8798.33 56.25 249.17 5418.12 5498.22 6306.53 6346.24 -1864.20 -6029.05 0.36 0.30 -0.24 5945248.88 625242.46 N 70.25879835 W 148.98766921 BP _MWD+IFR+MS 8894,23 56,77 249.26 5471.04 5551.14 6386.48 6426.22 -1892.58 -6103.83 0.55 0.54 0.09 5945219.20 625168.20 N 70.25872065 W 148.98827333 BP _MWD+IFR+MS 8987.54 57.25 249.62 5521.84 5601.94 6464.73 6504.49 -1920.07 -6177.11 0.61 0.51 0.39 5945190.44 625095.42 N 70.25864540 W 148.98886538 BP _MWD+IFR+MS 9082,69 57.48 249.51 5573.16 5653.26 6544.84 6584,61 -1948,04 -6252.19 0.26 0.24 -0.12 5945161.16 625020.84 N 70.25856880 W 148.98947202 BP _MWD+IFR+MS 9178.33 57.79 249.92 5624.35 5704.45 6625.61 6665.40 -1976.05 -6327.96 0.49 0.32 0.43 5945131.84 624945.57 N 70.25849212 W 148.99008420 BP _MWD+IFR+MS 9272.67 57.88 249.70 5674.58 5754.68 6705.46 6745,26 -2003.61 -6402.92 0.22 0.10 -0.23 5945102.98 624871,11 N 70.25841665 W 148.99068976 BP _MWD+IFR+MS 9368.86 57.32 251.53 5726.12 5806.22 6786.67 6826.47 -2030.57 -6479,52 1.71 -0.58 1.90 5945074.69 624795.00 N 70.25834282 W 148.99130867 BP _MWD+IFR+MS 9462.58 57,05 253.24 5776.91 5857.01 6865.40 6905.23 -2054.41 -6554.59 1.56 -0.29 1.82 5945049.55 624720.36 N 70.25827752 W 148.99191516 BP _MWD+IFR+MS 9556.06 56.98 254.25 5827.80 5907.90 6943.70 6983.64 -2076.36 -6629.86 0.91 -0.07 1.08 5945026.30 624645.49 N 70.25821738 W 148.99252336 BP _MWD+IFR+MS 9650.33 57.01 254.24 5879.15 5959.25 7022.61 7062.70 -2097.82 -6705,95 0.03 0.03 -0.01 5945003.51 624569.79 N 70.25815855 W 148.99313811 BP _MWD+IFR+MS 9745.07 56.69 254.27 5930.96 6011.06 7101.78 7142.02 -2119.35 -6782.30 0.34 -0.34 0.03 5944980.66 624493.84 N 70.25809956 W 148.99375494 BP _MWD+IFR+MS 9840.20 56.44 254.22 5983.38 6063.48 7181.02 7221.41 -2140.90 -6858.70 0.27 -0.26 -0.05 5944957.78 624417.83 N 70.25804048 W 148.99437224 BP _MWD+IFR+MS 9936,08 56.36 254.29 6036.44 6116.54 7260,73 7301.27 -2162.57 -6935.56 0.10 -0.08 0.07 5944934,78 624341,36 N 70.25798109 W 148.99499326 BP _MWD+IFR+MS 10031.49 56.32 254.68 6089.32 6169.42 7339.97 7380.68 -2183.81 -7012.08 0.34 -0.04 0.41 5944912.20 624265.23 N 70.25792286 W 148,99561150 BP _MWD+IFR+MS 10124.41 55.87 254.57 6141.15 6221,25 7416.91 7457.80 -2204.26 -7086.44 0.49 -0.48 -0.12 5944890.47 624191.24 N 70.25786681 W 148.99621228 BP _MWD+IFR+MS 10219.28 56.02 253.77 6194.28 6274.38 7495.37 7536.40 -2225.70 -7162.06 0.72 0.16 -0.84 5944867.71 624116,02 N 70.25780804 W 148.99682322 BP _MWD+IFR+MS 10314.65 56.08 253.47 6247.54 6327,64 7574.38 7615.51 -2248.01 -7237,96 0.27 0.06 -0.31 5944844.08 624040.52 N 70.25774689 W 148.99743643 BP _MWD+IFR. 10409.46 56.66 252.45 6300.05 6380.15 7653.26 7694.45 -2271.15 -7313.44 1.08 0.61 -1.08 5944819.64 623965.47 N 70.25768349 W 148.99804618 BP _MWD+IFR+ 10503.53 57.48 251.60 6351.19 6431.29 7732.20 7773.41 -2295.51 -7388.54 1,16 0.87 -0.90 5944793.97 623890.81 N 70.25761672 W 148.99865290 BP _MWD+IFR+MS 10598.08 57,68 251,35 6401.88 6481,98 7812.01 7853.22 -2320.87 -7464.21 0.31 0.21 -0.26 5944767.30 623815.60 N 70.25754724 W 148.99926428 BP _MWD+IFR+MS 10693.36 57.65 251.24 6452,84 6532.94 7892.51 7933.73 -2346,69 -7540.47 0.10 -0.03 -0.12 5944740.16 623739.81 N 70.25747650 W 148.99988030 BP _MWD+IFR+MS 10787.48 57,27 251,32 6503.47 6583.57 7971.85 8013.07 -2372.16 -7615.61 0.41 -0.40 0.08 5944713.39 623665.12 N 70.25740672 W 149.00048738 BP _MWD+IFR+MS 10881.36 56.87 251,68 6554,50 6634.60 8050,64 8091,87 -2397.16 -7690.34 0.53 -0.43 0.38 5944687.09 623590.85 N 70.25733821 W 149.00109104 BP _MWD+IFR+MS 10975.55 56.50 251.80 6606.23 6686.33 8129.34 8170.58 -2421.82 -7765.09 0.41 -0.39 0.13 5944661.13 623516.55 N 70.25727062 W 149.00169489 BP _MWD+IFR+MS 11069.80 56.60 252.23 6658.18 6738.28 8207.96 8249.22 -2446.10 -7839.88 0.40 0.11 0.46 5944635.55 623442.20 N 70.25720407 W 149.00229913 BP _MWD+IFR+MS 11164.76 57,33 252.22 6709.95 6790.05 8287.54 8328.83 -2470.41 -7915.69 0.77 0.77 -0.01 5944609.93 623366.83 N 70.25713746 W 149.00291154 BP _MWD+IFR+MS 11257.91 57,89 252,18 6759.85 6839.95 8366.17 8407.49 -2494.45 -7990.58 0.60 0.60 -0,04 5944584.59 623292.38 N 70.25707156 W 149.00351655 BP _MWD+IFR+MS 11352.80 58.26 252.08 6810,03 6890.13 8446.68 8488.02 -2519.16 -8067.23 0.40 0.39 -0.11 5944558.54 623216.17 N 70.25700382 W 149.00413577 BP _MWD+IFR+MS 11446.42 58.09 252.79 6859.40 6939.50 8526.19 8567.57 -2543.17 -8143.07 0.67 -0.18 0.76 5944533.22 623140.77 N 70.25693801 W 149.00474840 BP _MWD+IFR+MS 11541.00 57.52 252.24 6909.79 6989.89 8606.19 8647.60 -2567.22 -8219.41 0,78 -0.60 -0.58 5944507.85 623064.87 N 70.25687209 W 149.00536509 BP _MWD+IFR+MS 11635.35 57.20 251,83 6960.68 7040.78 8685.62 8727.05 -2591.72 -8294.98 0.50 -0.34 -0.43 5944482.03 622989.74 N 70.25680492 W 149.00597560 BP _MWD+IFR+MS SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031rt-546 ) P-27\P-27\P-27\P-27 Generated 6/4/2004 10:00 AM Page 3 of 7 Comments Survey Tool Model 11728.79 57.33 251.82 7011.21 7091.31 8764.21 8805.65 -2616,24 -8369.66 0.14 0.14 -0.01 5944456.22 622915.51 N 70.25673772 W 149.00657887 BP _MWD+IFR+MS 11823,56 56.31 252.28 7063.07 7143.17 8843.50 8884.97 -2640.68 -8445.12 1.15 -1.08 0.49 5944430.46 622840.50 N 70.25667070 W 149.00718840 BP _MWD+IFR+MS 11917.33 56,51 252.26 7114.95 7195.05 8921.59 8963,08 -2664.47 -8519.52 0.21 0.21 -0.02 5944405.39 622766.53 N 70.25660548 W 149.00778943 BP _MWD+IFR+MS 12011.81 56.67 252.52 7166.97 7247.07 9000.42 9041.95 -2688.33 -8594.69 0.29 0.17 0.28 5944380.22 622691.79 N 70.25654007 W 149.00839666 BP _MWD+IFR+MS 12104.65 56.64 252,74 7218.00 7298.10 9077.93 9119,51 -2711.49 -8668.71 0.20 -0,03 0.24 5944355.78 622618.19 N 70.25647658 W 149.00899460 BP _MWD+IFR+MS 12199.19 56,60 253.06 7270.02 7350.12 9156.82 9198.45 -2734.70 -8744.17 0.29 -0.04 0.34 5944331.26 622543.16 N 70.25641292 W 149.00960412 BP _MWD+IFR+MS 12292.94 56.36 253.00 7321.79 7401.89 9234.92 9276.61 -2757.51 -8818.92 0.26 -0.26 -0.06 5944307.15 622468.82 N 70.25635036 W 149.01020800 BP _MWD+IFR+MS 12389,34 56.47 253.06 7375.12 7455.22 9315.16 9356.92 -2780.95 -8895.73 0.13 0.11 0.06 5944282.38 622392.43 N 70.25628608 W 149.01082847 BP _MWD+IFR+MS 12482.26 56.22 253.31 7426.61 7506,71 9392.44 9434.26 -2803.32 -8969.77 0.35 -0.27 0.27 5944258.72 622318.80 N 70.25622472 W 149.01142655 BP _MWD+IFR+MS 12578.20 55.95 253.02 7480.14 7560.24 9471.98 9513.88 -2826.38 -9045.98 0.38 -0.28 -0.30 5944234.34 622243.02 N 70.25616147 W 149.01204212 BP _MWD+IFR+MS 12672.54 55.82 252.25 7533.05 7613.15 9550.05 9591.99 -2849.69 -9120.52 0.69 -0.14 -0.82 5944209.73 622168.89 N 70.25609754 W 149.01264428 BP _MWD+IFR+MS 12768.28 55.63 251.29 7586.97 7667,07 9629.15 9671.10 -2874.44 -9195,66 0.85 -0.20 -1.00 5944183.68 622094.20 N 70.25602968 W 149.01325124 BP MWD+IFR+MS 12860,91 54.95 250.30 7639,72 7719.82 9705.29 9747.24 -2899.49 -9267.57 1,14 -0.73 -1.07 5944157.39 622022.75 N 70.25596102 W 149.01383205 BP =MWD+IF_ 12955.40 53.96 249.31 7694.65 7774,75 9782.16 9824.13 -2926.02 -9339.73 1.35 -1.05 -1.05 5944129.60 621951.07 N 70.25588828 W 149.01441486 BP _MWD+IF 13048.72 53.60 248.23 7749.79 7829.89 9857.40 9899.41 -2953.28 -9409.90 1.01 -0.39 -1.16 5944101.12 621881.39 N 70.25581357 W 149.01498164 BP _MWD+IFR+MS 13142.06 53.69 247.29 7805.12 7885.22 9932.47 9974.58 -2981.73 -9479.48 0.82 0,10 -1.01 5944071.47 621812.32 N 70.25573561 W 149.01554359 BP _MWD+IFR+MS 13235.82 54.26 246.73 7860.27 7940.37 10008.14 10050.41 -3011.35 -9549.28 0.78 0.61 -0.60 5944040.64 621743.05 N 70.25565445 W 149.01610736 BP _MWD+IFR+MS 13326.96 53.73 245.89 7913.85 7993.95 10081.64 10124.14 -3040.97 -9616.80 0.95 -0,58 -0.92 5944009.85 621676.06 N 70.25557329 W 149.01665262 BP _MWD+IFR+MS 13424.89 53.51 244.93 7971.93 8052.03 10160.14 10202.98 -3073.78 -9688.49 0.82 -0.22 -0.98 5943975.80 621604.96 N 70.25548341 W 149.01723159 BP _MWD+IFR+MS 13519.24 53.47 242.35 8028,07 8108.17 10235.39 10278.81 -3107.45 -9756.43 2,20 -0.04 -2.73 5943940.96 621537.62 N 70.25539120 W 149.01778023 BP _MWD+IFR+MS 13612.68 53.96 239.04 8083.38 8163.48 10309.53 10354.12 -3144.31 -9822.09 2.90 0.52 -3.54 5943902.96 621472.62 N 70.25529026 W 149.01831042 BP _MWD+IFR+MS 13710.50 55.46 235.73 8139.90 8220.00 10387.19 10433.96 -3187.35 -9889.32 3.16 1.53 -3.38 5943858.75 621406.16 N 70.25517243 W 149,01885318 BP _MWD+IFR+MS 13801.40 56.42 232.64 8190.82 8270.92 10459.36 10509.26 -3231.42 -9950.37 3.01 1.06 -3.40 5943813.63 621345.90 N 70.25505182 W 149.01934599 BP _MWD+IFR+MS 13894.83 56.40 229.90 8242.52 8322.62 10532.73 10587.08 -3280.11 -10011.07 2.44 -0.02 -2.93 5943763.90 621286.05 N 70.25491859 W 149.01983599 BP _MWD+IFR+MS 13988.90 56.57 227.61 8294.46 8374.56 10605.44 10665.51 -3331,81 -10070.04 2.04 0.18 -2.43 5943711.18 621228.00 N 70.25477713 W 149.02031188 BP _MWD+IFR+MS 14083,29 56.22 224.65 8346.71 8426.81 10676,91 10744.12 -3386.28 -10126.70 2.64 -0.37 -3.14 5943655,74 621172.30 N 70,25462811 W 149.02076917 BP _MWD+IFR+MS 14177.25 55.41 222.48 8399.51 8479.61 10746.05 10821.84 -3442.59 -10180.27 2.10 -0.86 -2.31 5943598.51 621119.73 N 70.25447408 W 149.02120138 BP _MWD+IFR+MS 14270.45 54.78 220.25 8452.84 8532.94 10812.65 10898.27 -3499.94 -10230,78 2.08 -0.68 -2.39 5943540.29 621070,23 N 70.25431721 W 149.02160888 BP _MWD+IFR+MS 14365.10 54.26 217.33 8507.79 8587.89 10878.04 10975.34 -3560.00 -10279.06 2,57 -0.55 -3.09 5943479.40 621023.01 N 70.25415295 W 149.02199833 BP _MWD+IFR+MS 14459.34 54,22 214.95 8562.87 8642,97 10940.98 11051.81 -3621.75 -10324.16 2.05 -0.04 -2.53 5943416.88 620979.00 N 70.25398408 W 149.02236202 BP _MWD+IFR+MS 14553.35 53.66 212.36 8618.21 8698.31 11001.60 11127.80 -3685.00 -10366.27 2.31 -0,60 -2.76 5943352.91 620937.99 N 70.25381113 W 149.02270162 BP _MWD+IFR+MS 14646.84 52.50 209.43 8674.38 8754.48 11058.99 11202.54 -3749.12 -10404.65 2.80 -1.24 -3.13 5943288.14 620900.74 N 70.25363582 W 149.02301103 BP _MWD+IFR+MS 14740.80 51.74 207.99 8732,07 8812.17 11114.07 11276.70 -3814.16 -10440.28 1.46 -0.81 -1.53 5943222.49 620866.25 N 70.25345801 W 149.02329817 BP _MWD+IFR. 14826.11 52.74 208.16 8784.31 8864.41 11163.67 11344.14 -3873.66 -10472.02 1.18 1.17 0.20 5943162.45 620835.55 N 70.25329531 W 149.02355396 BP MWD+IFR 14859.82 55.41 208.31 8804,09 8884.19 11183.79 11371.44 -3897.71 -10484.94 7.93 7.92 0.44 5943138.18 620823.06 N 70.25322957 W 149.02365803 BP _MWD+IFR+ 14892,22 58.83 210.19 8821.67 8901.77 11204.18 11398.64 -3921 .44 -10498.24 11.63 10.56 5.80 5943114.22 620810.18 N 70.25316469 W 149.02376522 BP _MWD+IFR+MS 14923.02 62.27 210.11 8836.81 8916.91 11224.54 11425.46 -3944.63 -10511.71 11.17 11.17 -0,26 5943090.81 620797.12 N 70.25310129 W 149.02387378 BP _MWD+IFR+MS 14955.05 65.65 211.84 8850.87 8930.97 11246.66 11454.23 -3969.30 -10526.52 11.61 10.55 5.40 5943065.89 620782.74 N 70.25303384 W 149.02399319 BP _MWD+IFR+MS 14988.06 69.46 207.91 8863.48 8943.58 11269.71 11484,74 -3995.75 -10541.70 15.94 11.54 -11.91 5943039.18 620768.02 N 70.25296152 W 149.02411552 BP _MWD+IFR+MS 15019.88 73,74 206.64 8873.52 8953.62 11291.62 11514.92 -4022.58 -10555.53 13.97 13.45 -3.99 5943012.11 620754.67 N 70.25288817 W 149.02422695 BP _MWD+IFR+MS 15051.33 77.93 209.19 8881.22 8961.32 11313.98 11545.41 -4049.51 -10569.80 15.47 13.32 8.11 5942984.94 620740.86 N 70.25281453 W 149.02434200 BP _MWD+IFR+MS 15085.97 79.40 204.16 8888.03 8968.13 11338.37 11579.37 -4079.85 -10585.04 14.86 4.24 -14.52 5942954.34 620726.16 N 70.25273159 W 149.02446477 BP _MWD+IFR+MS 15113,89 77.79 200.40 8893.55 8973.65 11356.52 11606.74 -4105.17 -10595.42 14.41 -5.77 -13.47 5942928.84 620716,22 N 70.25266238 W 149.02454832 BP _MWD+IFR+MS 15145.38 76.49 197.01 8900.56 8980,66 11375.41 11637.44 -4134.24 -10605.26 11.28 -4.13 -10,77 5942899.61 620706.89 N 70.25258291 W 149.02462754 BP _MWD+IFR+MS 15178.15 76.90 190.18 8908.11 8988.21 11392.69 11669.33 -4165.22 -10612.75 20.32 1.25 -20.84 5942868.51 620699.94 N 70.25249826 W 149.02468769 BP _MWD+IFR+MS 15208.25 77.00 183.79 8914.92 8995.02 11405.65 11698.65 -4194.31 -10616.32 20.68 0.33 -21.23 5942839.36 620696.88 N 70.25241878 W 149.02471615 BP _MWD+IFR+MS 15241.80 78.86 182.81 8921,93 9002.03 11418.24 11731.45 -4227.06 -10618.21 6.24 5.54 -2.92 5942806.59 620695.57 N 70.25232929 W 149.02473103 BP _MWD+IFR+MS SurveyEditor Ver 3,1 RT-SP3.03-HF4.00 Bld( do31rt-546 ) P-27\P-27\P-27\P-27 Generated 6/4/2004 10:00 AM Page 4 of 7 Comments Survey Tool Model 15369.25 81.12 176.63 8943.27 9023.37 11460.42 11857.10 -4352.62 -10619.01 5.74 1.70 -5.56 5942681.04 620696.95 N 70.25198627 W 149.02473614 BP _MWD+IFR+MS 15400.12 80.33 176.32 8948.24 9028.34 11468.68 11887.57 -4383.03 -10617.14 2.74 -2.56 -1.00 5942650.67 620699.35 N 70.25190320 W 149.02472066 BP _MWD+IFR+MS 15433,23 79,91 174.27 8953,93 9034.03 11476.88 11920.19 -4415.54 -10614.47 6.23 -1.27 -6.19 5942618.22 620702.59 N 70.25181440 W 149.02469867 BP _MWD+IFR+MS 15464.72 80.15 173.02 8959.38 9039.48 11483.80 11951.20 -4446.36 -10611.03 3.98 0.76 -3.97 5942587.46 620706.56 N 70.25173021 W 149.02467059 BP _MWD+IFR+MS 15498,31 80,12 169.82 8965.13 9045.23 11489.94 11984.29 -4479.08 -10606.10 9.39 -0.09 -9.53 5942554.84 620712.06 N 70,25164084 W 149.02463033 BP _MWD+IFR+MS 15530.58 81,36 166.34 8970.33 9050.43 11494.00 12016.14 -4510.23 -10599.52 11.32 3.84 -10.78 5942523.80 620719,19 N 70.25155575 W 149.02457683 BP _MWD+IFR+MS 15561.88 85.54 167,34 8973.90 9054.00 11497.31 12047.23 -4540,51 -10592.44 13.73 13.35 3.19 5942493.66 620726.79 N 70.25147307 W 149.02451931 BP _MWD+IFR+MS 15592.80 89.80 163.64 8975.15 9055.25 11499.86 12078.12 -4570.40 -10584.70 18.24 13.78 -11.97 5942463.91 620735.05 N 70.25139143 W 149.02445645 BP _MWD+IFR+MS 15626.07 94.23 165.43 8973.98 9054,08 11502.06 12111.36 -4602.44 -10575.84 14.36 13.32 5.38 5942432.03 620744.47 N 70.25130394 W 149.02438447 BP _MWD+IFR+MS 15656.86 96,64 163.24 8971.07 9051.17 11503.99 12142.01 -4631.95 -10567.56 10.55 7.83 -7.11 5942402,67 620753.25 N 70.25122335 W 149.02431729 BP MWD+IFR+MS 15686,31 96.20 157.27 8967,77 9047.87 11503.74 12171,27 -4659.48 -10557.68 20.20 -1.49 -20.27 5942375.32 620763.61 N 70.25114818 W 149.02423714 BP~MWD+IF_ 15720.56 96.37 158.35 8964.02 9044.12 11502.00 12205.32 -4691,00 -10544.82 3.17 0.50 3.15 5942344.03 620777.02 N 70.25106211 W 149.02413291 BP _MWD+IFR+MS 15752.71 97,57 157.01 8960.12 9040.22 11500.29 12237,23 -4720.52 -10532.70 5.57 3.73 -4.17 5942314.73 620789,65 N 70.25098151 W 149.02403467 BP _MWD+IFR+MS 15783.47 97.81 158.69 8956.01 9036.11 11498.76 12267.71 -4748.76 -10521,21 5.47 0.78 5.46 5942286.70 620801.63 N 70.25090442 W 149.02394150 BP _MWD+IFR+MS 15816.23 97.06 157.30 8951.77 9031.87 11497.20 12300.20 -4778.87 -10509.04 4.79 -2.29 -4.24 5942256.80 620814.32 N 70.25082219 W 149.02384283 BP _MWD+IFR+MS 15848.94 95.71 159.94 8948.13 9028.23 11496.00 12332.70 -4809.14 -10497.19 9.02 -4.13 8.07 5942226.75 620826.70 N 70.25073955 W 149.02374677 BP _MWD+IFR+MS 15880.28 95.40 158.11 8945.09 9025.19 11495.07 12363.90 -4838.26 -10486,03 5.90 -0.99 -5.84 5942197.83 620838.37 N 70.25066002 W 149.02365624 BP _MWD+IFR+MS 15913.18 96.13 159.24 8941.79 9021.89 11493.89 12396.63 -4868.76 -10474.12 4,07 2.22 3.43 5942167.55 620850.80 N 70.25057677 W 149.02355974 BP _MWD+IFR+MS 15944.78 96.44 159.68 8938.33 9018.43 11493.19 12428.04 -4898.17 -10463.10 1.70 0.98 1.39 5942138,34 620862.33 N 70.25049646 W 149.02347037 BP _MWD+IFR+MS 15974.73 95,85 159.62 8935.12 9015.22 11492.62 12457.82 -4926.09 -10452.75 1.98 -1.97 -0.20 5942110.61 620873.17 N 70.25042022 W 149.02338640 BP _MWD+IFR+MS 16008.92 96.23 160.06 8931.53 9011.63 11492.08 12491.82 -4958.00 -10441.03 1.70 1.11 1.29 5942078.90 620885.44 N 70.25033307 W 149.02329138 BP _MWD+IFR+MS 16039.64 95,54 160.44 8928.38 9008.48 11491.82 12522,37 -4986.77 -10430.70 2.56 -2.25 1.24 5942050.33 620896.27 N 70.25025454 W 149.02320764 BP _MWD+IFR+MS 16070.05 94.82 159,71 8925.63 9005.73 11491.47 12552.66 -5015.24 -10420.38 3.36 -2.37 -2.40 5942022.04 620907.08 N 70.25017679 W 149.02312395 BP _MWD+IFR+MS 16104.20 94.16 158.66 8922,96 9003.06 11490,55 12586,71 -5047.06 -10408.28 3.62 -1.93 -3.07 5941990.44 620919.73 N 70.25008990 W 149.02302586 BP _MWD+IFR+MS 16136.71 95.19 157.51 8920.31 9000.41 11489.05 12619.11 -5077.12 -10396.19 4.74 3.17 -3.54 5941960.59 620932.34 N 70.25000782 W 149.02292783 BP _MWD+IFR+MS 16166.74 95.99 158.37 8917.38 8997.48 11487.59 12648.99 -5104.82 -10384.97 3.90 2.66 2.86 5941933.10 620944.05 N 70.24993220 W 149.02283684 BP _MWD+IFR+MS 16198.65 94.85 159.28 8914.37 8994.47 11486.53 12680.76 -5134.44 -10373.49 4.56 -3.57 2.85 5941903,68 620956.04 N 70.24985131 W 149.02274382 BP _MWD+IFR+MS 16230,57 95.20 158.33 8911,57 8991.67 11485.45 12712,56 -5164.09 -10362.00 3.16 1.10 -2.98 5941874.24 620968.05 N 70.24977037 W 149.02265062 BP _MWD+IFR+MS 16262.33 96.09 158.71 8908.45 8988.55 11484.23 12744.16 -5193.50 -10350.42 3.04 2.80 1.20 5941845.04 620980.13 N 70.24969006 W 149.02255680 BP _MWD+IFR+MS 16294.93 96.44 158.73 8904.89 8984,99 11483.09 12776.57 -5223,69 -10338.66 1.08 1.07 0.06 5941815.06 620992.41 N 70.24960761 W 149.02246146 BP _MWD+IFR+MS 16327.07 96.30 159.74 8901.32 8981.42 11482.25 12808.51 -5253.56 -10327.34 3.15 -0.44 3.14 5941785.40 621004.26 N 70.24952606 W 149.02236965 BP MWD+IF. 16357.54 97.13 158.13 8897.76 8977.86 11481.29 12838.77 -5281.80 -10316.46 5.91 2.72 -5.28 5941757.36 621015.62 N 70.24944896 W 149.02228148 BP _MWD+IFR+ 16390.21 96.09 161.53 8894.00 8974.10 11480.78 12871.22 -5312.26 -10305.27 10.82 -3.18 10.41 5941727.10 621027.34 N 70.24936579 W 149.02219077 BP _MWD+IFR+MS 16422,03 96.88 161.28 8890.41 8970.51 11481.15 12902.84 -5342.22 -10295.19 2.60 2.48 -0.79 5941697.32 621037.94 N 70.24928397 W 149.02210900 BP _MWD+IFR+MS 16453.13 97.23 162.07 8886.59 8966.69 11481.65 12933.70 -5371.52 -10285.49 2.76 1.13 2.54 5941668.19 621048.15 N 70.24920396 W 149.02203029 BP _MWD+IFR+MS 16484.72 96.23 162.25 8882,88 8962.98 11482.43 12965.08 -5401.38 -10275.88 3.22 -3.17 0,57 5941638.50 621058.28 N 70.24912241 W 149.02195232 BP _MWD+IFR+MS 16517.57 94.20 163.99 8879.90 8960.00 11483.79 12997.79 -5432.68 -10266.38 8.12 -6,18 5.30 5941607.38 621068.32 N 70.24903693 W 149.02187525 BP _MWD+IFR+MS 16547.36 92.48 163.79 8878.16 8958.26 11485.42 13027.53 -5461.25 -10258.13 5.81 -5.77 -0.67 5941578.96 621077.07 N 70.24895891 W 149.02180828 BP _MWD+IFR+MS 16580.14 90.28 164.13 8877.37 8957.47 11487,26 13060.30 -5492.75 -10249.07 6.79 -6.71 1.04 5941547.63 621086.67 N 70.24887290 W 149.02173479 BP _MWD+IFR+MS 16612.73 88.50 167.93 8877.72 8957.82 11490.27 13092,88 -5524.37 -10241.21 12.87 -5.46 11.66 5941516.16 621095.09 N 70.24878656 W 149.02167091 BP _MWD+IFR+MS 16644.89 87.71 167.89 8878.78 8958.88 11494.28 13125.02 -5555.79 -10234.48 2.46 -2.46 -0.12 5941484.85 621102.36 N 70.24870072 W 149.02161618 BP _MWD+IFR+MS 16676.39 85.89 170.11 8880.54 8960.64 11498.79 13156.47 -5586.66 -10228.48 9.10 -5.78 7.05 5941454.09 621108.90 N 70.24861641 W 149.02156737 BP _MWD+IFR+MS 16708.41 84.44 170.83 8883.24 8963.34 11504.19 13188.38 -5618.13 -10223.19 5.05 -4.53 2.25 5941422.73 621114.73 N 70.24853047 W 149.02152435 BP _MWD+IFR+MS 16740.10 83.47 169,71 8886.58 8966.68 11509.40 13219.89 -5649.19 -10217.87 4.66 -3.06 -3.53 5941391.77 621120.60 N 70.24844563 W 149.02148099 BP _MWD+IFR+MS 16772.65 83,72 170.79 8890.21 8970.31 11514.75 13252.24 -5681.07 -10212.39 3,39 0.77 3.32 5941359,99 621126.63 N 70.24835856 W 149.02143639 BP _MWD+IFR+MS SurveyEditor Ver 3.1 RT-SP3,03-HF4.00 Bld( d031rt-546 ) P-27\P-27\P-27\P-27 Generated 6/4/2004 10:00 AM Page 5 of 7 Comments Survey Tool Model 16804.61 84.52 170,81 8893.48 8973.58 11520.30 13284.03 -5712.45 -10207.31 2.50 2.50 0.06 5941328.71 621132.26 N 70.24827285 W 149.02139499 BP _MWD+IFR+MS 16834.52 84.96 172.58 8896.23 8976,33 11525.96 13313.81 -5741.92 -10203.01 6.07 1.47 5.92 5941299.32 621137.07 N 70.24819235 W 149.02135992 BP _MWD+IFR+MS 16867.94 84.17 172.13 8899.39 8979.49 11532.66 13347.08 -5774.89 -10198.58 2,72 -2.36 -1.35 5941266.43 621142.07 N 70.24810228 W 149.02132381 BP _MWD+IFR+MS 16900.13 83.58 173.19 8902,83 8982.93 11539.27 13379.09 -5806.64 -10194.49 3.75 -1.83 3.29 5941234.76 621146.71 N 70.24801558 W 149.02129043 BP _MWD+IFR+MS 16931.37 84.48 173.77 8906.08 8986.18 11546.12 13410.16 -5837.51 -10190.96 3.42 2,88 1.86 5941203.96 621150.78 N 70.24793126 W 149.02126160 BP _MWD+IFR+MS 16964.60 84.82 175.03 8909.17 8989.27 11553.94 13443.25 -5870.43 -10187,73 3.91 1,02 3.79 5941171.10 621154.58 N 70.24784132 W 149.02123516 BP _MWD+IFR+MS 16995.38 84.23 175.61 8912.11 8992.21 11561.65 13473.89 -5900.97 -10185.23 2.68 -1.92 1.88 5941140.61 621157,61 N 70.24775790 W 149.02121463 BP _MWD+IFR+MS 17026.80 83.69 175.16 8915.42 8995.52 11569.55 13505,13 -5932.12 -10182.72 2.23 -1.72 -1.43 5941109.52 621160.67 N 70.24767282 W 149.02119399 BP _MWD+IFR+MS 17059.14 84.10 176.52 8918.86 8998.96 11577,93 13537.29 -5964.19 -10180.39 4.37 1.27 4.21 5941077.50 621163,56 N 70.24758522 W 149.02117480 BP _MWD+IFR+MS 17092,04 84.69 174,83 8922.07 9002.17 11586.36 13570.03 -5996.83 -10177.92 5.42 1.79 -5.14 5941044.90 621166.60 N 70.24749604 W 149.02115449 BP _MWD+IFR+MS 17123.21 85.06 172.79 8924.85 9004.95 11593.38 13601.08 -6027.70 -10174.57 6.63 1.19 -6.54 5941014.10 621170.48 N 70.24741173 W 149.02112712 BP _MWD+IFR+MS 17156.06 83.79 174.24 8928.05 9008.15 11600.61 13633.77 -6060.18 -10170.88 5.85 -3.87 4.41 5940981.69 621174.74 N 70.24732300 W 149.02109693 BP MWD+IFR+MS 17218.22 85.55 174.29 8933.82 9013.92 11615.09 13695.66 -6121.76 -10164.69 2.83 2.83 0.08 5940920.23 621181.99 N 70.24715479 W 149.02104631 BP =MWD+1Fe 17250.11 85.37 172.58 8936.34 9016.44 11622.07 13727.45 -6153,34 -10161,06 5.38 -0,56 -5.36 5940888.73 621186.18 N 70.24706853 W 149.02101661 BP _MWD+IF 17282.96 84.65 172.72 8939.20 9019.30 11628.83 13760.17 -6185.80 -10156.87 2.23 -2.19 0.43 5940856.35 621190.93 N 70.24697987 W 149.02098244 BP _MWD+IFR+MS 17313.85 85.20 173.53 8941.93 9022.03 11635.42 13790.94 -6216.34 -10153.19 3.16 1.78 2.62 5940825.87 621195.14 N 70.24689644 W 149.02095236 BP _MWD+IFR+MS 17344.84 85,93 174.30 8944.33 9024.43 11642.47 13821,84 -6247.07 -10149.91 3.42 2.36 2.48 5940795.22 621198.95 N 70.24681252 W 149.02092557 BP _MWD+IFR+MS 17378.15 85.24 173.24 8946.89 9026.99 11649.95 13855.05 -6280.08 -10146.31 3.79 -2.07 -3.18 5940762.27 621203.13 N 70.24672233 W 149.02089610 BP _MWD+IFR+MS 17409.15 84.38 172.22 8949.70 9029.80 11656.37 13885,92 -6310.70 -10142.40 4.29 -2.77 -3.29 5940731.72 621207.57 N 70.24663869 W 149.02086421 BP _MWD+IFR+MS 17442.43 84.61 172.66 8952.89 9032.99 11663.09 13919.05 -6343.54 -10138.05 1.49 0.69 1.32 5940698.97 621212.50 N 70.24654899 W 149.02082866 BP _MWD+IFR+MS 17474.10 85.37 174.96 8955.66 9035.76 11670.22 13950.60 -6374.90 -10134.65 7.62 2.40 7.26 5940667.67 621216.45 N 70.24646332 W 149.02080084 BP _MWD+IFR+MS 17505.24 86.40 173,67 8957.89 9037.99 11677.51 13981.66 -6405.81 -10131.57 5.29 3.31 -4.14 5940636.83 621220.06 N 70.24637890 W 149.02077565 BP _MWD+IFR+MS 17537.83 86.99 175.42 8959.77 9039.87 11685.27 14014.19 -6438.20 -10128.48 5,66 1.81 5.37 5940604.50 621223.72 N 70.24629043 W 149.02075032 BP _MWD+IFR+MS 17570.08 87.99 173,93 8961.18 9041.28 11693.03 14046.41 -6470.28 -10125.49 5.56 3,10 -4.62 5940572.48 621227.27 N 70.24620280 W 149.02072582 BP _MWD+IFR+MS 17600.95 88.88 175.00 8962.03 9042.13 11700.35 14077.27 -6500.99 -10122.51 4.51 2.88 3.47 5940541.83 621230.78 N 70.24611891 W 149.02070145 BP _MWD+IFR+MS 17633.75 90.04 173.45 8962.34 9042.44 11708,00 14110.07 -6533.62 -10119.21 5.90 3.54 -4.73 5940509.26 621234.65 N 70.24602977 W 149.02067444 BP _MWD+IFR+MS 17666.64 90.59 175.22 8962.15 9042,25 11715.73 14142.96 -6566.35 -10115.96 5.64 1.67 5.38 5940476.60 621238.46 N 70.24594038 W 149.02064787 BP _MWD+IFR+MS 17696.88 91.35 175.49 8961.64 9041.74 11723,36 14173.19 -6596.49 -10113.51 2.67 2.51 0.89 5940446.51 621241.44 N 70.24585805 W 149.02062776 BP _MWD+IFR+MS 17729.41 92.51 172.89 8960.55 9040,65 11730.92 14205.70 -6628.83 -10110.22 8.75 3,57 -7.99 5940414.24 621245.29 N 70.24576971 W 149.02060083 BP _MWD+IFR+MS 17762.45 93.20 175.23 8958.90 9039.00 11738.52 14238.70 -6661.64 -10106.81 7.38 2.09 7.08 5940381.49 621249.28 N 70.24568007 W 149.02057290 BP _MWD+IFR+MS 17791.34 94.13 175.05 8957.05 9037.15 11745.69 14267.53 -6690.37 -10104.37 3.28 3.22 -0.62 5940352.81 621252.22 N 70.24560159 W 149.02055286 BP _MWD+IFR+MS 17824.87 95.12 174.19 8954.35 9034.45 11753.71 14300.95 -6723.64 -10101.23 3.91 2.95 -2.56 5940319.60 621255.93 N 70.24551071 W 149.02052719 BP _MWD+IFR+MS 17857,74 95.47 174.36 8951,32 9031.42 11761.37 14333.68 -6756.21 -10097,97 1.18 1.06 0.52 5940287.09 621259.76 N 70.24542175 W 149.02050047 BP _MWD+IF. 17888.84 95.40 176.89 8948.37 9028.47 11769,32 14364.64 -6787.08 -10095.61 8.10 -0.23 8.14 5940256.28 621262.66 N 70.24533743 W 149.02048106 BP _MWD+IF 17921,77 95.09 177.54 8945.36 9025.46 11778.62 14397.43 -6819,83 -10094,01 2.18 -0.94 1.97 5940223.56 621264.83 N 70.24524796 W 149.02046784 BP _MWD+IFR 17953.13 94.54 176.98 8942.73 9022.83 11787.51 14428.68 -6851,05 -10092.52 2.50 -1.75 -1.79 5940192.38 621266.86 N 70.24516268 W 149.02045543 BP _MWD+IFR+MS 17983.84 93.96 177.12 8940.45 9020.55 11796.11 14459.31 -6881.63 -10090.94 1.94 -1.89 0.46 5940161.83 621268.97 N 70.24507914 W 149.02044237 BP _MWD+IFR+MS 18017.35 93.34 177.93 8938.32 9018.42 11805.77 14492.75 -6915,04 -10089.50 3.04 -1.85 2.42 5940128.45 621271.00 N 70.24498787 W 149.02043035 BP _MWD+IFR+MS 18048.27 93.72 178.63 8936.42 9016.52 11815.07 14523.61 -6945.89 -10088.57 2.57 1.23 2,26 5940097.63 621272.46 N 70.24490360 W 149.02042253 BP _MWD+IFR+MS 18079.42 94.61 175.42 8934.15 9014.25 11823.78 14554.68 -6976.91 -10086.96 10.67 2.86 -10.30 5940066.64 621274.61 N 70.24481885 W 149.02040918 BP _MWD+IFR+MS 18112.34 94.88 178.45 8931 .43 9011.53 11832.93 14587.49 -7009.67 -10085.21 9.21 0.82 9.20 5940033.92 621276.94 N 70.24472937 W 149.02039466 BP _MWD+IFR+MS 18143.50 94,51 177.49 8928.88 9008.98 11842.13 14618.54 -7040.70 -10084.11 3.29 -1.19 -3.08 5940002.91 621278.58 N 70.24464459 W 149.02038544 BP _MWD+IFR+MS 18175.15 94.06 181.22 8926.51 9006.61 11852.20 14650.10 -7072.26 -10083.75 11.84 -1.42 11.78 5939971.37 621279.48 N 70.24455839 W 149.02038223 BP _MWD+IFR+MS 18207,85 93.92 182.04 8924.24 9004.34 11863.83 14682.72 -7104,86 -10084.68 2.54 -0.43 2.51 5939938.76 621279,12 N 70.24446930 W 149.02038937 BP _MWD+IFR+MS 18239.29 93.37 183.31 8922.24 9002.34 11875.55 14714.10 -7136.20 -10086.14 4.39 -1. 75 4.04 5939907.40 621278.21 N 70.24438368 W 149.02040086 BP _MWD+IFR+MS 18270.40 94.51 180.36 8920.10 9000.20 11886.72 14745.14 -7167.22 -10087.14 10.14 3,66 -9.48 5939876.37 621277.75 N 70.24429893 W 149.02040855 BP _MWD+IFR+MS 18306.16 94,51 182.65 8917.29 8997.39 11899.36 14780.79 -7202.86 -10088.07 6.38 0.00 6.40 5939840.73 621277.44 N 70.24420158 W 149.02041573 BP _MWD+IFR+MS SurveyEditor Ver 3.1 RT -SP3.03-HF4.00 Bld( do31 rt-546 ) P-27\P-27\P-27\P-27 Generated 6/4/2004 10:00 AM Page 6 of 7 Comments Survey Tool Model N 70.24412322 N 70,24403629 W 149.02043093 BP _MWD+IFR+MS N 70.24394249 W 149.02044153 BP _MWD+IFR+MS 18433.66 98.54 180.73 8903.03 8983.13 11944.76 14907.46 -7329.46 -10091.93 18461,88 99.24 181.21 8898.67 8978.77 11954.40 14935.34 -7357.33 -10092.40 18494.45 100,16 181.85 8893.18 8973.28 11965.80 14967.44 -7389.43 -10093.26 Last Corrected MWD 18524.48 100.92 182.47 8887.69 8967.79 11976.58 14996.97 -7418.93 -10094.37 TO 18584,00 102.43 182.47 8875,64 8955.74 11998.16 15055.25 -7477.16 -10096.88 3.61 3.00 3.43 3.24 2.54 3.30 2.48 2.82 2.53 2.54 -1.46 1.70 1.97 2.06 0.00 5939714.09 5939686.21 5939654.11 5939624.60 5939566.33 621275.79 621275.80 621275.51 621274.91 621273.41 N 70.24385569 W 149.02044551 BP _MWD+IFR+MS N 70.24377953 W 149.02044902 BP _MWD+IFR+MS N 70.24369186 W 149,02045559 BP _MWD+IFR+MS N 70.24361125 W 149.02046426 BP _MWD+IFR+MS N 70.24345216 W 149.02048391 BP _BLIND Survey Tvpe: Definitive Survey NOTES: GYD GC MS - ( Gyrodata - gyro compassing m/s - Older Gyrodata gyro multlshots-plus all battery/memory tool surveys (RGS-BT). Replaces ex-BP "Gyrodata multlshot Into open hole" model. ) MWD + IFR + MS - ( In-field referenced MWD with mult-statlon analysis and correction applied In post-processing. Assumes a BHA sag correction Is applied to enhance Inclination accuracy. ) Lellal Description: Surface: 2490 FSL 3051 FEL S31 T11N R13E UM BHL: 286 FSL 2861 FEL S2 T10N R12E UM NorthlnlllYllftUSl 5947217.72 5939566.33 Eastlnll IX) IftUSl 631237.61 621273.41 e e SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031rt-546 ) P-27\P-27\P-27\P-27 Generated 6/4/2004 10:00 AM Page 7 of 7 Cellar Elevation:::: 51,130' NaborslES RKB "" 28.30' 1 O· 3!4" BTC 4 1!21lnér with 5.75" II) X 1 1 feét of éxíena!t::111 1465 IŒR 7 5/8 x: 5 1/2 ZXP ervðC2 14666 Me ]·518",29.7 Mod Completion TREE: FMC 4~'1!i6" SM WELLHEAD: FMC Gen 5 BTC~ 4-1/2" 'X' with 3.813" sea! bore. 4·1/2" Cameo Gas lift. Mandrels with pups Installed , 4~i¡2", 12.60# \lam OD: 4.932" DriftllD. 3,833"/3.958" with 3,813" @ Production Pao!<:er@ 14599 with 3.1313" @14628' 4· 1/211 Mule-Shoe Guide slotted liner from: Solid 1 Slotted from:: Solid from: into 4-1/2" liner tie·bao!<:@ 14659' !ST slotted and solid liner , SCRLUMBERGER Survey report Client.......... .., ... ...: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . . .: PBU Well. . . . . . . . . . . . . . . . . . . . .: P-27 API number..... .... .,. ...: 50-029-23203-00 Engineer........ ... ... ...: T.Webster/E.Beney 411ÞRi9:............. ... .....: Nabors 7ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions. ....: Minimum curvature Method for DLS... ........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent..... ..: 55.41 ft KB above permanent.......: -50000.00 ft DF above permanent.......: 80.10 ft ----- Vertical section origin---------------- Latitude (+N/S-).. ... ....: 0.00 ft Departure (+E/W-).... ....: 0.00 ft 411Þ---~- Platform reference point--------------- Latltude (+N/S-).. .... ...: -999.25 ft Departure (+E/W-).. ... ...: -999.25 ft Azimuth from rotary table to target: 250.74 degrees [(c)2004 IDEAL ID8_1C_01] .~ ~ v(- 6~O 21-May-2004 10:28:16 Spud date.. . . . . . . . . . . . . . . : Last survey date..... ....: Total accepted surveys...: MD of first survey.. .....: MD of last survey. .......: Page 1 of 11 27-Apr-04 21-May-04 275 0.00 ft 18584.00 ft ----- Geomagnetic data ---------------------- Magnetic model. ..... .....: BGGM version 2003 Magnetic date............: 26-Apr-2004 Magnetic field strength..: 1151.53 RCNT Magnetic dec (+E/W-). ....: 25.14 degrees Magnetic dip..... ........: 80.81 degrees ----- MWD survey Reference Reference G..............: Reference R.. ...... ......: Reference Dip............: Tolerance of G...........: Tolerance of R. ..... .....: Tolerance of Dip.........: Criteria --------- 1002.68 mGal 1151. 53 RCNT 80.81 degrees (+/-) 2.50 mGal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 25.14 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+EfW-) ....: 25.14 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 2 of 11 --- -------- ------ -------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 100.00 1.11 251.23 100.00 99.99 0.97 -0.31 -0.92 0.97 251.23 1.11 GYD-GC-SS 3 150.00 1. 02 248.86 50.00 149.99 1. 90 -0.63 -1. 79 1. 90 250.67 0.20 GYD-GC-SS 4 296.40 1. 34 270.38 146.40 296.35 4.81 -1. 09 -4.72 4.84 257.03 0.37 MWD-IFR-MS 5 385.03 2.95 278.11 88.63 384.92 7.81 -0.76 -8.01 8.05 264.60 1. 84 MWD-IFR-MS . 6 475.59 4.80 286.36 90.56 475.27 12.96 0.64 -13.96 13.97 272.62 2.13 MWD-IFR-MS 7 559.88 6.67 289.58 84.29 559.13 19.64 3.27 -21.95 22.19 278.48 2.25 MWD-IFR-MS 8 654.74 9.21 272.81 94.86 653.09 30.97 5.49 -34.73 35.16 278.99 3.60 MWD-IFR-MS 9 744.31 11. 53 268.58 89.57 741.19 46.14 5.62 -50.84 51.15 276.31 2.72 MWD-IFR-MS 10 833.95 14.41 269.21 89.64 828.54 65.25 5.24 -70.95 71.15 274.23 3.22 MWD-IFR-MS 11 926.05 16.60 268.83 92.10 917.28 88.63 4.82 -95.57 95.69 272.89 2.38 MWD-IFR-MS 12 1020.78 17.50 268.97 94.73 1007.84 115.02 4.29 -123.34 123.41 271.99 0.95 MWD-IFR-MS 13 1114.77 20.62 270.48 93.99 1096.67 144.03 4.17 -154.02 154.08 271. 55 3.36 MWD-IFR-MS 14 1208.52 23.14 270.77 93.75 1183.66 176.88 4.56 -188.96 189.01 271. 38 2.69 MWD-IFR-MS 15 1302.72 24.26 270.32 94.20 1269.91 212.50 4.91 -226.82 226.87 271.24 1. 20 MWD-IFR-MS 16 1397.08 26.72 269.28 94.36 1355.08 250.88 4.75 -267.42 267.46 271. 02 2.65 MWD-IFR-MS 17 1490.90 30.02 267.66 93.82 1437.63 293.35 3.53 -311.97 311.99 270.65 3.61 MWD-IFR-MS 18 1584.77 33.23 266.43 93.87 1517.55 340.59 0.97 -361.12 361.12 270.15 3.49 MWD-IFR-MS 19 1679.35 37.36 266.50 94.58 1594.72 393.18 -2.40 -415.65 415.66 269.67 4.37 MWD-IFR-MS 20 1773.12 38.66 265.54 93.77 1668.60 448.88 -6.41 -473.25 473.30 269.22 1. 52 MWD-IFR-MS . 21 1867.01 43.32 263.72 93.89 1739.46 508.65 -12.22 -534.54 534.68 268.69 5.12 MWD-IFR-MS 22 1961. 42 45.41 262.25 94.41 1806.95 573.16 -20.30 -600.05 600.39 268.06 2.47 MWD-IFR-MS 23 2055.49 46.95 261.19 94.07 1872.08 639.79 -30.08 -667.21 667.89 267.42 1. 83 MWD-IFR-MS 24 2150.08 47.78 261.46 94.59 1936.15 708.19 -40.57 -736.00 737.12 266.84 0.90 MWD-IFR-MS 25 2243.50 47.23 259.81 93.42 1999.26 776.04 -51.78 -803.96 805.63 266.32 1. 43 MWD-IFR-MS 26 2338.06 47.98 260.00 94.56 2063.02 844.99 -64.02 -872.71 875.06 265.80 0.81 MWD-IFR-MS 27 2428.84 49.18 257.25 90.78 2123.08 912.41 -77.45 -939.44 942.62 265.29 2.63 MWD-IFR-MS 28 2522.58 54.56 255.68 93.74 2180.94 985.75 -94.74 -1011.09 1015.51 264.65 5.89 MWD-IFR-MS 29 2618.22 56.73 255.18 95.64 2234.91 1064.43 -114.61 -1087.50 1093.52 263.98 2.31 MWD-IFR-MS 30 2713 . 12 56.92 256.16 94.90 2286.84 1143.57 -134.26 -1164.46 1172.17 263.42 0.89 MWD-IFR-MS ((c)2004 IDEAL ID8_lC_01J SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 3 of 11 --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 2808.59 57.44 254.16 95.47 2338.59 1223.56 -154.82 -1242.00 1251.61 262.89 1. 84 MWD-IFR-MS 32 2902.11 59.00 250.50 93.52 2387.85 1303.00 -178.96 -1317.72 1329.82 262.27 3.72 MWD-IFR-MS 33 2996.78 59.28 249.23 94.67 2436.41 1384.26 -206.93 -1394.02 1409.30 261. 56 1.19 MWD-IFR-MS 34 3090.19 58.69 249.57 93.41 2484.54 1464.29 -235.10 -1468.96 1487.65 260.91 0.70 MWD-IFR-MS 35 3185.48 57.93 250.35 95.29 2534.60 1545.36 -262.89 -1545.13 1567.33 260.34 1. 06 MWD-IFR-MS . 36 3277.93 57.26 250.36 92.45 2584.14 1623.41 -289.13 -1618.64 1644.26 259.87 0.72 MWD-IFR-MS 37 3372.68 59.11 248.90 94.75 2634.09 1703.91 -317.16 -1694.11 1723.54 259.40 2.35 MWD-IFR-MS 38 3466.66 58.77 249.99 93.98 2682.58 1784.39 -345.43 -1769.48 1802.89 258.95 1. 06 MWD-IFR-MS 39 3560.47 57.08 249.14 93.81 2732.40 1863.86 -373.18 -1843.97 1881.35 258.56 1.96 MWD-IFR-MS 40 3655.20 58.84 248.00 94.73 2782.65 1944.10 -402.52 -1918.71 1960.48 258.15 2.12 MWD-IFR-MS 41 3748.40 58.95 248.27 93.20 2830.80 2023.81 -432.24 -1992.77 2039.11 257.76 0.27 MWD-IFR-MS 42 3842.88 58.56 249.02 94.48 2879.81 2104.54 -461.65 -2068.00 2118.90 257.42 0.79 MWD-IFR-MS 43 3935.77 58.02 249.05 92.89 2928.63 2183.52 -489.93 -2141.79 2197.11 257.12 0.58 MWD-IFR-MS 44 4031.68 57.36 249.22 95.91 2979.90 2264.55 -518.80 -2217.54 2277.41 256.83 0.70 MWD-IFR-MS 45 4125.63 58.88 249.45 93.95 3029.51 2344.30 -546.95 -2292.18 2356.53 256.58 1. 63 MWD-IFR-MS 46 4219.39 58.63 250.06 93.76 3078 .15 2424.45 -574.69 -2367.39 2436.14 256.36 0.62 MWD-IFR-MS 47 4312.87 58.36 251. 02 93.48 3127.00 2504.15 -601. 24 -2442.53 2515.44 256.17 0.92 MWD-IFR-MS 48 4407.23 57.67 251.26 94.36 3176.98 2584.18 -627.11 -2518.27 2595.18 256.02 0.76 MWD-IFR-MS 49 4500.63 59.14 251.77 93.40 3225.91 2663.73 -652.34 -2593.72 2674.49 255.88 1. 64 MWD-IFR-MS 50 4594.54 58.63 251.86 93.91 3274.44 2744.11 -677.43 -2670.10 2754.70 255.76 0.55 MWD-IFR-MS . 51 4646.72 58.76 251. 60 52.18 3301.55 2788.69 -691.40 -2712.44 2799.17 255.70 0.49 MWD-IFR-MS 52 4731.27 57.87 251. 04 84.55 3345.96 2860.63 -714.45 -2780.60 2870.91 255.59 1.19 MWD-IFR-MS 53 4826.21 59.36 250.40 94.94 3395.40 2941. 68 -741.21 -2857.09 2951. 67 255.46 1. 67 MWD-IFR-MS 54 4921. 90 59.81 250.87 95.69 3443.85 3024.20 -768.57 -2934.95 3033.91 255.33 0.63 MWD-IFR-MS 55 5018.34 59.62 250.52 96.44 3492.48 3107.48 -796.10 -3013.54 3116.92 255.20 0.37 MWD-IFR-MS 56 5114.50 59.31 250.13 96.16 3541. 34 3190.30 -823.99 -3091.53 3199.46 255.08 0.48 MWD-IFR-MS 57 5208.27 59.41 249.79 93.77 3589.13 3270.97 -851.63 -3167.33 3279.82 254.95 0.33 MWD-IFR-MS 58 5303.93 59.41 249.92 95.66 3637.81 3353.31 -879.99 -3244.63 3361.85 254.83 0.12 MWD-IFR-MS 59 5395.76 59.38 249.59 91. 83 3684.56 3432.33 -907.34 -3318.79 3440.59 254.71 0.31 MWD-IFR-MS 60 5491.64 58.81 250.21 95.88 3733.81 3514.59 -935.62 -3396.04 3522.57 254.60 0.81 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_Ol] SCHLUMBERGER Survey Report 21-MaY-2004 10:28:16 Page 4 of 11 -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 5586.22 58.06 250.63 94.58 3783.32 3595.18 -962.62 -3471.97 3602.95 254.50 0.88 MWD-IFR-MS 62 5679.95 57.94 251.59 93.73 3832.99 3674.66 -988.36 -3547.18 3682.30 254.43 0.88 MWD-IFR-MS 63 5772.59 57.92 252.30 92.64 3882.17 3753.14 -1012.69 -3621.81 3760.73 254.38 0.65 MWD-IFR-MS 64 5867.86 57.34 252.64 95.27 3933.18 3833.57 -1036.93 -3698.54 3841.15 254.34 0.68 MWD-IFR-MS 65 5962.23 57.26 253.34 94.37 3984.16 3912.92 -1060.16 -3774.48 3920.54 254.31 0.63 MWD-IFR-MS . 66 6058.40 57.68 254.29 96.17 4035.88 3993.89 -1082.76 -3852.35 4001.62 254.30 0.94 MWD-IFR-MS 67 6152.24 57.33 254.63 93.84 4086.29 4072.87 -1103.96 -3928.60 4080.76 254.30 0.48 MWD-IFR-MS 68 6247.31 57.35 254.72 95.07 4137.60 4152.72 -1125.11 -4005.79 4160.80 254.31 0.08 MWD-IFR-MS 69 6343.18 57.44 254.48 95.87 4189.26 4233.30 -1146.56 -4083.65 4241. 56 254.32 0.23 MWD-IFR-MS 70 6437.79 57.05 254.34 94.61 4240.44 4312.70 -1167.94 -4160.29 4321.13 254.32 0.43 MWD-IFR-MS 71 6532.51 56.99 254.12 94.72 4292.00 4392.01 -1189.54 -4236.76 4400.58 254.32 0.20 MWD-IFR-MS 72 6627.53 57.55 254.38 95.02 4343.38 4471.79 -1211.23 -4313.69 4480.52 254.32 0.63 MWD-IFR-MS 73 6721. 70 57.20 254.62 94.17 4394.15 4550.93 -1232.43 -4390.12 4559.83 254.32 0.43 MWD-IFR-MS 74 6818.54 57.25 254.41 96.84 4446.57 4632.18 -1254.17 -4468.59 4641.25 254.32 0.19 MWD-IFR-MS 75 6914.19 56.93 253.67 95.65 4498.54 4712.35 -1276.25 -4545.79 4721. 55 254.32 0.73 MWD-IFR-MS 76 7007.52 57.00 252.67 93.33 4549.42 4790.52 -1298.90 -4620.68 4799.77 254.30 0.90 MWD-IFR-MS 77 7102.71 57.25 251. 07 95.19 4601.10 4870.44 -1323.78 -4696.65 4879.64 254.26 1. 44 MWD-IFR-MS 78 7198.68 57.62 249.30 95.97 4652.76 4951.31 -1351.20 -4772.74 4960.32 254.19 1. 60 MWD-IFR-MS 79 7294.16 58.02 248.30 95.48 4703.61 5032.08 -1380.42 -4848.08 5040.78 254.11 0.98 MWD-IFR-MS 80 7387.91 58.20 247.91 93.75 4753.13 5111. 59 -1410.11 -4921. 94 5119.95 254.01 0.40 MWD-IFR-MS . 81 7481.92 58.66 247.84 94.01 4802.35 5191. 59 -1440.27 -4996.14 5199.59 253.92 0.49 MWD-IFR-MS 82 7577.28 59.29 247.85 95.36 4851.50 5273.20 -1471. 09 -5071.82 5280.86 253.83 0.66 MWD-IFR-MS 83 7672.23 59.88 246.83 94.95 4899.57 5354.94 -1502.64 -5147.38 5362.22 253.73 1.12 MWD-IFR-MS 84 7767.68 60.32 246.11 95.45 4947.15 5437.46 -1535.67 -5223.24 5444.31 253.62 0.80 MWD-IFR-MS 85 7861.36 59.79 246.17 93.68 4993.91 5518.37 -1568.51 -5297.48 5524.81 253.51 0.57 MWD-IFR-MS 86 7954.56 59.13 246.31 93.20 5041.27 5598.39 -1600.85 -5370.95 5604.44 253.40 0.72 MWD-IFR-MS 87 8047.68 58.86 246.38 93.12 5089.24 5677.97 -1632.87 -5444.06 5683.66 253.30 0.30 MWD-IFR-MS 88 8140.16 58.63 246.18 92.48 5137.22 5756.79 -1664.67 -5516.43 5762.13 253.21 0.31 MWD-IFR-MS 89 8234.04 58.09 246.37 93.88 5186.47 5836.47 -1696.83 -5589.60 5841. 48 253.11 0.60 MWD-IFR-MS 90 8328.95 57.29 248.08 94.91 5237.20 5916.53 -1727.89 -5663.56 5921.27 253.03 1. 74 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_01] SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 5 of 11 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 8423.86 56.46 249.71 94.91 5289.07 5995.97 -1756.51 -5737.71 6000.55 252.98 1. 68 MWD-IFR-MS 92 8517.19 55.92 250.26 93.33 5341.00 6073.51 -1783.05 -5810.57 6077.99 252.94 0.76 MWD-IFR-MS 93 8611.26 55.94 249.76 94.07 5393.70 6151. 43 -1809.69 -5883.80 6155.81 252.90 0.44 MWD-IFR-MS 94 8704.18 55.97 249.40 92.92 5445.72 6228.40 -1836.56 -5955.95 6232.68 252.86 0.32 MWD-IFR-MS 95 8798.33 56.25 249.17 94.15 5498.22 6306.53 -1864.20 -6029.05 6310.68 252.82 0.36 MWD-IFR-MS . 96 8894.23 56.77 249.26 95.90 5551.14 6386.48 -1892.58 -6103.83 6390.51 252.77 0.55 MWD-IFR-MS 97 8987.54 57.25 249.62 93.31 5601.94 6464.73 -1920.07 -6177.11 6468.64 252.73 0.61 MWD-IFR-MS 98 9082.69 57.48 249.51 95.15 5653.26 6544.84 -1948.04 -6252.19 6548.65 252.69 0.26 MWD-IFR-MS 99 9178.33 57.79 249.92 95.64 5704.45 6625.61 -1976.05 -6327.96 6629.32 252.66 0.49 MWD-IFR-MS 100 9272.67 57.88 249.70 94.34 5754.68 6705.46 -2003.61 -6402.92 6709.08 252.62 0.22 MWD-IFR-MS 101 9368.86 57.32 251. 53 96.19 5806.22 6786.67 -2030.57 -6479.52 6790.25 252.60 1. 71 MWD-IFR-MS 102 9462.58 57.05 253.24 93.72 5857.01 6865.40 -2054.41 -6554.59 6869.00 252.60 1. 56 MWD-IFR-MS 103 9556.06 56.98 254.25 93.48 5907.91 6943.70 -2076.35 -6629.86 6947.40 252.61 0.91 MWD-IFR-MS 104 9650.33 57.01 254.24 94.27 5959.26 7022.61 -2097.82 -6705.95 7026.42 252.63 0.03 MWD-IFR-MS 105 9745.07 56.69 254.27 94.74 6011.06 7101.78 -2119.35 -6782.30 7105.71 252.65 0.34 MWD-IFR-MS 106 9840.20 56.44 254.22 95.13 6063.48 7181. 02 -2140.90 -6858.70 7185.07 252.66 0.27 MWD-IFR-MS 107 9936.08 56.36 254.29 95.88 6116.54 7260.73 -2162.57 -6935.56 7264.90 252.68 0.10 MWD-IFR-MS 108 10031.49 56.32 254.68 95.41 6169.42 7339.97 -2183.81 -7012.08 7344.27 252.70 0.34 MWD-IFR-MS 109 10124.41 55.87 254.57 92.92 6221. 25 7416.91 -2204.26 -7086.44 7421.35 252.72 0.49 MWD-IFR-MS 110 10219.28 56.02 253.77 94.87 6274.38 7495.37 -2225.70 -7162.06 7499.92 252.74 0.72 MWD-IFR-MS . 111 10314.65 56.08 253.47 95.37 6327.64 7574.38 -2248.01 -7237.96 7579.03 252.75 0.27 MWD-IFR-MS 112 10409.46 56.66 252.45 94.81 6380.15 7653.26 -2271.15 -7313.44 7657.97 252.75 1. 08 MWD-IFR-MS 113 10503.53 57.48 251.60 94.07 6431.29 7732.20 -2295.51 -7388.54 7736.91 252.74 1.16 MWD-IFR-MS 114 10598.08 57.68 251.35 94.55 6481. 98 7812.00 -2320.87 -7464.21 7816.71 252.73 0.31 MWD-IFR-MS 115 10693.36 57.65 251. 24 95.28 6532.94 7892.51 -2346.69 -7540.47 7897.19 252.71 0.10 MWD-IFR-MS 116 10787.48 57.27 251. 32 94.12 6583.57 7971.85 -2372.16 -7615.61 7976.51 252.70 0.41 MWD-IFR-MS 117 10881.36 56.87 251.68 93.88 6634.60 8050.64 -2397.16 -7690.34 8055.29 252.69 0.53 MWD-IFR-MS 118 10975.55 56.50 251.80 94.19 6686.33 8129.34 -2421. 82 -7765.08 8133.99 252.68 0.41 MWD-IFR-MS 119 11069.80 56.60 252.23 94.25 6738.28 8207.96 -2446.10 -7839.88 8212.62 252.67 0.40 MWD-IFR-MS 120 11164.76 57.33 252.22 94.96 6790.05 8287.54 -2470.41 -7915.69 8292.23 252.67 0.77 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_01] SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 6 of 11 -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 121 11257.91 57.89 252.18 93.15 6839.95 8366.17 -2494.45 -7990.58 8370.88 252.66 0.60 MWD-IFR-MS 122 11352.80 58.26 252.08 94.89 6890.13 8446.68 -2519.16 -8067.23 8451. 42 252.66 0.40 MWD-IFR-MS 123 11446.42 58.09 252.79 93.62 6939.50 8526.19 -2543.17 -8143.07 8530.96 252.66 0.67 MWD-IFR-MS 124 11541.00 57.52 252.24 94.58 6989.89 8606.19 -2567.22 -8219.41 8611.00 252.65 0.78 MWD-IFR-MS 125 11635.35 57.20 251. 83 94.35 7040.78 8685.62 -2591.72 -8294.98 8690.44 252.65 0.50 MWD-IFR-MS . 126 11728.79 57.33 251. 82 93.44 7091.31 8764.20 -2616.24 -8369.66 8769.03 252.64 0.14 MWD-IFR-MS 127 11823.56 56.31 252.28 94.77 7143.17 8843.50 -2640.68 -8445.12 8848.35 252.64 1.15 MWD-IFR-MS 128 11917.33 56.51 252.26 93.77 7195.05 8921.58 -2664.47 -8519.52 8926.46 252.63 0.21 MWD-IFR-MS 129 12011.81 56.67 252.52 94.48 7247.07 9000.42 -2688.33 -8594.69 9005.32 252.63 0.29 MWD-IFR-MS 130 12104.65 56.64 252.74 92.84 7298.10 9077.93 -2711.49 -8668.71 9082.88 252.63 0.20 MWD-IFR-MS 131 12199.19 56.60 253.06 94.54 7350.12 9156.82 -2734.70 -8744.17 9161.82 252.63 0.29 MWD-IFR-MS 132 12292.94 56.36 253.00 93.75 7401.89 9234.92 -2757.51 -8818.92 9239.98 252.64 0.26 MWD-IFR-MS 133 12389.34 56.47 253.06 96 .40 7455.22 9315.16 -2780.95 -8895.73 9320.28 252.64 0.13 MWD-IFR-MS 134 12482.26 56.22 253.31 92.92 7506.71 9392.44 -2803.32 -8969.77 9397.63 252.64 0.35 MWD-IFR-MS 135 12578.20 55.95 253.02 95.94 7560.24 9471. 98 -2826.38 -9045.97 9477.24 252.65 0.38 MWD-IFR-MS 136 12672.54 55.82 252.25 94.34 7613 .15 9550.04 -2849.69 -9120.52 9555.34 252.65 0.69 MWD-IFR-MS 137 12768.28 55.63 251.29 95.74 7667.07 9629.14 -2874.44 -9195.66 9634.45 252.64 0.85 MWD-IFR-MS 138 12860.91 54.95 250.30 92.63 7719.82 9705.29 -2899.49 -9267.57 9710.55 252.63 1.14 MWD-IFR-MS 139 12955.40 53.96 249.31 94.49 7774.75 9782.16 -2926.02 -9339.72 9787.34 252.60 1. 35 MWD-IFR-MS 140 13048.72 53.60 248.23 93.32 7829.89 9857.40 -2953.28 -9409.90 9862.46 252.58 1. 01 MWD-IFR-MS . 141 13142.06 53.69 247.29 93.34 7885.22 9932.46 -2981.73 -9479.48 9937.36 252.54 0.82 MWD-IFR-MS 142 13235.82 54.26 246.73 93.76 7940.37 10008.13 -3011.35 -9549.28 10012.84 252.50 0.78 MWD-IFR-MS 143 13326.96 53.73 245.89 91. 14 7993.95 10081.64 -3040.97 -9616.80 10086.14 252.45 0.95 MWD-IFR-MS 144 13424.89 53.51 244.93 97.93 8052.03 10160.14 -3073.78 -9688.49 10164.40 252.40 0.82 MWD-IFR-MS 145 13519.24 53.47 242.35 94.35 8108.17 10235.38 -3107.45 -9756.43 10239.34 252.33 2.20 MWD-IFR-MS 146 13612.68 53.96 239.04 93.44 8163.48 10309.53 -3144.31 -9822.09 10313.11 252.25 2.90 MWD-IFR-MS 147 13710.50 55.46 235.73 97.82 8220.00 10387.19 -3187.35 -9889.32 10390.27 252.14 3.16 MWD-IFR-MS 148 13801.40 56.42 232.64 90.90 8270.92 10459.36 -3231.42 -9950.36 10461. 92 252.01 3.01 MWD-IFR-MS 149 13894.83 56.40 229.90 93.43 8322.62 10532.72 -3280.11 -10011.07 10534.73 251.86 2.44 MWD-IFR-MS 150 13988.90 56.57 227.61 94.07 8374.56 10605.44 -3331.81 -10070.03 10606.91 251.69 2.04 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_01] SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 7 of 11 -------- ------ ------- ------ -------- -------- ---------------- -------.-------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +NjS- +EjW- displ Azim (degj tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 151 14083.29 56.22 224.65 94.39 8426.81 10676.90 -3386.28 -10126.70 10677.87 251.51 2.64 MWD-IFR-MS 152 14177.25 55.41 222.48 93.96 8479.61 10746.05 -3442.59 -10180.27 10746.59 251.32 2.10 MWD-IFR-MS 153 14270.45 54.78 220.25 93.20 8532.94 10812.65 -3499.94 -10230.78 10812.88 251.11 2.08 MWD-IFR-MS 154 14365.10 54.26 217.33 94.65 8587.89 10878.04 -3560.00 -10279.06 10878.08 250.90 2.57 MWD-IFR-MS 155 14459.34 54.22 214.95 94.24 8642.97 10940.98 -3621.75 -10324.15 10940.99 250.67 2.05 MWD-IFR-MS . 156 14553.35 53.66 212.36 94.01 8698.31 11001.60 -3685.00 -10366.27 11001.76 250.43 2.31 MWD-IFR-MS 157 14646.84 52.50 209.43 93.49 8754.48 11058.99 -3749.12 -10404.65 11059.50 250.18 2.80 MWD-IFR-MS 158 14740.80 51. 74 207.99 93.96 8812.17 11114.07 -3814.16 -10440.28 11115.18 249.93 1.46 MWD-IFR-MS 159 14826.11 52.74 208.16 85.31 8864.41 11163.67 -3873.66 -10472.02 11165.50 249.70 1.18 Interp. AZ 160 14859.82 55.41 208.31 33.71 8884.18 11183.79 -3897.71 -10484.93 11185.97 249.61 7.93 MWD-IFR-MS 161 14892.22 58.83 210.19 32.40 8901.77 11204.17 -3921. 44 -10498.23 11206.72 249.52 11.63 MWD-IFR-MS 162 14923.02 62.27 210.11 30.80 8916.91 11224.54 -3944.63 -10511.70 11227.47 249.43 11.17 MWD-IFR-MS 163 14955.05 65.65 211.84 32.03 8930.97 11246.66 -3969.30 -10526.52 11250.02 249.34 11. 61 MWD-IFR-MS 164 14988.06 69.46 207.91 33.01 8943.58 11269.71 -3995.75 -10541.69 11273.57 249.24 15.94 MWD-IFR-MS 165 15019.88 73.74 206.64 31.82 8953.62 11291. 62 -4022.58 -10555.52 11296.03 249.14 13.97 MWD-IFR-MS 166 15051.33 77.93 209.19 31. 45 8961. 32 11313.98 -4049.51 -10569.80 11318.98 249.04 15.47 MWD-IFR-MS 167 15085.97 79.40 204.16 34.64 8968.13 11338.37 -4079.85 -10585.04 11344.08 248.92 14.86 MWD-IFR-MS 168 15113.89 77.79 200.40 27.92 8973.65 11356.52 -4105.17 -10595.42 11362.89 248.82 14.41 MWD-IFR-MS 169 15145.38 76.49 197.01 31.49 8980.66 11375.40 -4134.24 -10605.26 11382.60 248.70 11.28 MWD-IFR-MS 170 15178.15 76.90 190.18 32.77 8988.21 11392.69 -4165.22 -10612.75 11400.86 248.57 20.32 MWD-IFR-MS . 171 15208.25 77.00 183.79 30.10 8995.01 11405.65 -4194.31 -10616.31 11414.83 248.44 20.68 MWD-IFR-MS 172 15241.80 78.86 182.81 33.55 9002.03 11418.23 -4227.06 -10618.20 11428.66 248.29 6.24 MWD-IFR-MS 173 15273.21 80.47 182.80 31. 41 9007.67 11429.84 -4257.92 -10619.71 11441.51 248.15 5.13 MWD-IFR-MS 174 15302.54 80.40 180.79 29.33 9012.54 11440.23 -4286.83 -10620.62 11453.14 248.02 6.76 MWD-IFR-MS 175 15336.86 80.57 178.43 34.32 9018.21 11451.18 -4320.67 -10620.39 11465.64 247.86 6.80 MWD-IFR-MS 176 15369.25 81.12 176.63 32.39 9023.37 11460.42 -4352.62 -10619.01 11476.44 247.71 5.74 MWD-IFR-MS 177 15400.12 80.33 176.32 30.87 9028.34 11468.68 -4383.03 -10617.14 11486.28 247.57 2.74 MWD-IFR-MS 178 15433.23 79.91 174.27 33.11 9034.02 11476.88 -4415.54 -10614.46 11496.25 247.41 6.23 MWD-IFR-MS 179 15464.72 80.15 173.02 31.49 9039.48 11483.80 -4446.36 -10611.03 11504.96 247.26 3.98 MWD-IFR-MS 180 15498.31 80.12 169.82 33.59 9045.23 11489.93 -4479.08 -10606.09 11513.09 247.11 9.39 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_01] SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 8 of 11 --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 181 15530.58 81. 36 166.34 32.27 9050.43 11494.00 -4510.23 -10599.51 11519.20 246.95 11. 32 MWD-IFR-MS 182 15561.88 85.54 167.34 31. 30 9054.00 11497.31 -4540.51 -10592.44 11524.58 246.80 13.73 MWD-IFR-MS 183 15592.80 89.80 163.64 30.92 9055.25 11499.86 -4570.40 -10584.70 11529.29 246.65 18.24 MWD-IFR-MS 184 15626.07 94.23 165.43 33.27 9054.08 11502.06 -4602.44 -10575.83 11533.89 246.48 14.36 MWD-IFR-MS 185 15656.86 96.64 163.24 30.79 9051.17 11503.98 -4631. 95 -10567.56 11538.12 246.33 10.55 MWD-IFR-MS . 186 15686.31 96.20 157.27 29.45 9047.87 11503.73 -4659.48 -10557.68 11540.16 246.19 20.20 MWD-IFR-MS 187 15720.56 96.37 158.35 34.25 9044.12 11501.99 -4691.00 -10544.82 11541.17 246.02 3.17 MWD-IFR-MS 188 15752.71 97.57 157.01 32.15 9040.22 11500.29 -4720.52 -10532.70 11542.14 245.86 5.57 MWD-IFR-MS 189 15783.47 97.81 158.69 30.76 9036.10 11498.75 -4748.75 -10521.21 11543.24 245.71 5.47 MWD-IFR-MS 190 15816.23 97.06 157.30 32.76 9031. 86 11497.20 -4778.87 -10509.04 11544.58 245.55 4.79 MWD-IFR-MS 191 15848.94 95.71 159.94 32.71 9028.22 11496.00 -4809.14 -10497.19 11546.37 245.39 9.02 MWD-IFR-MS 192 15880.28 95.40 158.11 31.34 9025.19 11495.06 -4838.26 -10486.02 11548.40 245.23 5.90 MWD-IFR-MS 193 15913 .18 96.13 159.24 32.90 9021.89 11493.88 -4868.75 -10474.12 11550.41 245.07 4.07 MWD-IFR-MS 194 15944.78 96.44 159.68 31. 60 9018.43 11493.18 -4898.17 -10463.10 11552.86 244.91 1. 70 MWD-IFR-MS 195 15974.73 95.85 159.62 29.95 9015.22 11492.61 -4926.09 -10452.74 11555.35 244.77 1. 98 MWD-IFR-MS 196 16008.92 96.23 160.06 34.19 9011. 62 11492.08 -4958.00 -10441.02 11558.41 244.60 1. 70 MWD-IFR-MS 197 16039.64 95.54 160.44 30.72 9008.47 11491. 82 -4986.76 -10430.70 11561.46 244.45 2.56 MWD-IFR-MS 198 16070.05 94.82 159.71 30.41 9005.73 11491.47 -5015.24 -10420.38 11564.46 244.30 3.36 MWD-IFR-MS 199 16104.20 94.16 158.66 34.15 9003.05 11490.54 -5047.06 -10408.28 11567.42 244.13 3.62 MWD-IFR-MS 200 16136.71 95.19 157.51 32.51 9000.41 11489.04 -5077 .12 -10396.19 11569.69 243.97 4.74 MWD-IFR-MS . 201 16166.74 95.99 158.37 30.03 8997.48 11487.58 -5104.82 -10384.96 11571.80 243.82 3.90 MWD-IFR-MS 202 16198.65 94.85 159.28 31.91 8994.47 11486.52 -5134.44 -10373.49 11574.62 243.67 4.56 MWD-IFR-MS 203 16230.57 95.20 158.33 31.92 8991. 67 11485.45 -5164.09 -10361.99 11577.51 243.51 3.16 MWD-IFR-MS 204 16262.33 96.09 158.71 31.76 8988.55 11484.22 -5193.50 -10350.42 11580.31 243.35 3.04 MWD-IFR-MS 205 16294.93 96.44 158.73 32.60 8984.99 11483.08 -5223.69 -10338.66 11583.38 243.19 1. 08 MWD-IFR-MS 206 16327.07 96.30 159.74 32.14 8981. 42 11482.24 -5253.56 -10327.33 11586.79 243.04 3.15 MWD-IFR-MS 207 16357.54 97.13 158.13 30.47 8977.86 11481.29 -5281.80 -10316.46 11589.94 242.89 5.91 MWD-IFR-MS 208 16390.21 96.09 161.53 32.67 8974.10 11480.78 -5312.25 -10305.27 11593.90 242.73 10.82 MWD-IFR-MS 209 16422.03 96.88 161.28 31.82 8970.50 11481.14 -5342.22 -10295.19 11598.72 242.58 2.60 MWD-IFR-MS 210 16453.13 97.23 162.07 31. 10 8966.68 11481.65 -5371.52 -10285.48 11603.64 242.42 2.76 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_01] SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 9 of 11 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 211 16484.72 96.23 162.25 31. 59 8962.98 11482.42 -5401.38 -10275.87 11608.98 242.27 3.22 MWD-IFR-MS 212 16517.57 94.20 163.99 32.85 8960.00 11483.78 -5432.68 -10266.38 11615.19 242.11 8.12 MWD-IFR-MS 213 16547.36 92.48 163.79 29.79 8958.26 11485.42 -5461.25 -10258.12 11621.29 241. 97 5.81 MWD-IFR-MS 214 16580.14 90.28 164.13 32.78 8957.47 11487.26 -5492.75 -10249.07 11628.14 241. 81 6.79 MWD-IFR-MS 215 16612.73 88.50 167.93 32.59 8957.82 11490.26 -5524.36 -10241.20 11636.19 241. 66 12.87 MWD-IFR-MS . 216 16644.89 87.71 167.89 32.16 8958.88 11494.27 -5555.79 -10234.47 11645.22 241. 50 2.46 MWD-IFR-MS 217 16676.39 85.89 170.11 31.50 8960.64 11498.79 -5586.66 -10228.47 11654.72 241. 36 9.10 MWD-IFR-MS 218 16708.41 84.44 170.83 32.02 8963.34 11504.18 -5618.13 -10223.19 11665.20 241. 21 5.05 MWD-IFR-MS 219 16740.10 83.47 169.71 31. 69 8966.68 11509.40 -5649.19 -10217.86 11675.53 241. 06 4.66 MWD-IFR-MS 220 16772.65 83.72 170.79 32.55 8970.31 11514.75 -5681.07 -10212.39 11686.20 240.91 3.39 MWD-IFR-MS 221 16804.61 84.52 170.81 31. 96 8973.58 11520.30 -5712.45 -10207.30 11697.05 240.77 2.50 MWD-IFR-MS 222 16834.52 84.96 172.58 29.91 8976.32 11525.96 -5741.92 -10203.00 11707.73 240.63 6.07 MWD-IFR-MS 223 16867.94 84.17 172 . 13 33.42 8979.49 11532.66 -5774.89 -10198.58 11720.08 240.48 2.72 MWD-IFR-MS 224 16900.13 83.58 173.19 32.19 8982.92 11539.27 -5806.64 -10194.49 11732.20 240.33 3.75 MWD-IFR-MS 225 16931.37 84.48 173 .77 31.24 8986.17 11546.12 -5837.51 -10190.96 11744.45 240.20 3.42 MWD-IFR-MS 226 16964.60 84.82 175.03 33.23 8989.27 11553.93 -5870.43 -10187.73 11758.05 240.05 3.91 MWD-IFR-MS 227 16995.38 84.23 175.61 30.78 8992.21 11561.65 -5900.97 -10185.23 11771.17 239.91 2.68 MWD-IFR-MS 228 17026.80 83.69 175.16 31. 42 8995.51 11569.55 -5932.12 -10182.72 11784.64 239.78 2.23 MWD-IFR-MS 229 17059.14 84.10 176.52 32.34 8998.95 11577.92 -5964.19 -10180.38 11798.80 239.64 4.37 MWD-IFR-MS 230 17092.04 84.69 174.83 32.90 9002.17 11586.36 -5996.83 -10177.92 11813.21 239.49 5.42 MWD-IFR-MS . 231 17123.21 85.06 172.79 31.17 9004.95 11593.38 -6027.70 -10174.57 11826.03 239.36 6.63 MWD-IFR-MS 232 17156.06 83.79 174.24 32.85 9008.14 11600.61 -6060.18 -10170.88 11839.45 239.21 5.85 MWD-IFR-MS 233 17218.22 85.55 174.29 62.16 9013.92 11615.09 -6121.76 -10164.69 11865.79 238.94 2.83 MWD-IFR-MS 234 17250.11 85.37 172.58 31. 89 9016.44 11622.07 -6153.34 -10161.06 11879.00 238.80 5.38 MWD-IFR-MS 235 17282.96 84.65 172.72 32.85 9019.30 11628.83 -6185.80 -10156.87 11892.27 238.66 2.23 MWD-IFR-MS 236 17313.85 85.20 173.53 30.89 9022.03 11635.42 -6216.34 -10153.19 11905.05 238.52 3.16 MWD-IFR-MS 237 17344.84 85.93 174.30 30.99 9024.43 11642.47 -6247.07 -10149.91 11918.33 238.39 3.42 MWD-IFR-MS 238 17378.15 85.24 173.24 33.31 9026.99 11649.96 -6280.08 -10146.31 11932.60 238.24 3.79 MWD-IFR-MS 239 17409.15 84.38 172.22 31.00 9029.80 11656.37 -6310.71 -10142.40 11945.43 238.11 4.29 MWD-IFR-MS 240 17442.43 84.61 172.66 33.28 9032.99 11663.09 -6343.54 -10138.04 11959.12 237.97 1.49 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_01J SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 10 of 11 -------- ------ ------- ------ -------- -------- ---------------- --------,------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +NjS- +EjW- displ Azim (degj tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 241 17474.10 85.37 174.96 31.67 9035.75 11670.22 -6374.91 -10134.64 11972.90 237.83 7.62 MWD-IFR-MS 242 17505.24 86.40 173.67 31.14 9037.99 11677.51 -6405.81 -10131.57 11986.79 237.70 5.29 MWD-IFR-MS 243 17537.83 86.99 175.42 32.59 9039.87 11685.27 -6438.20 -10128.47 12001.51 237.56 5.66 MWD-IFR-MS 244 17570.08 87.99 173.93 32.25 9041. 28 11693.03 -6470.28 -10125.48 12016.23 237.42 5.56 MWD-IFR-MS 245 17600.95 88.88 175.00 30.87 9042.12 11700.35 -6500.99 -10122.51 12030.29 237.29 4.51 MWD-IFR-MS . 246 17633.75 90.04 173.45 32.80 9042.43 11708.00 -6533.62 -10119.21 12045.19 237.15 5.90 MWD-IFR-MS 247 17666.64 90.59 175.22 32.89 9042.25 11715.73 -6566.35 -10115.96 12060.25 237.01 5.64 MWD-IFR-MS 248 17696.88 91.35 175.49 30.24 9041. 74 11723.36 -6596.49 -10113.51 12074.63 236.89 2.67 MWD-IFR-MS 249 17729.41 92.51 172.89 32.53 9040.64 11730.92 -6628.83 -10110.22 12089.5~ 236.75 8.75 MWD-IFR-MS 250 17762.45 93.20 175.23 33.04 9039.00 11738.52 -6661.64 -10106.81 12104.75 236.61 7.38 MWD-IFR-MS 251 17791. 34 94.13 175.05 28.89 9037.15 11745.70 -6690.37 -10104.36 12118.55 236.49 3.28 MWD-IFR-MS 252 17824.87 95.12 174.19 33.53 9034.45 11753.71 -6723.64 -10101.23 12134.34 236.35 3.91 MWD-IFR-MS 253 17857.74 95.47 174.36 32.87 9031. 42 11761.37 -6756.21 -10097.97 12149.71 236.21 1.18 MWD-IFR-MS 254 17888.84 95.40 176.89 31.10 9028.47 11769.33 -6787.08 -10095.61 12164.94 236.09 8.10 MWD-IFR-MS 255 17921.77 95.09 177.54 32.93 9025.46 11778.63 -6819.83 -10094.01 12181.92 235.96 2.18 MWD-IFR-MS 256 17953.13 94.54 176.98 31.36 9022.83 11787.51 -6851.05 -10092.52 12198.19 235.83 2.50 MWD-IFR-MS 257 17983.84 93.96 177.12 30.71 9020.55 11796.11 -6881.63 -10090.94 12214.09 235.71 1. 94 MWD-IFR-MS 258 18017.35 93.34 177.93 33.51 9018.42 11805.77 -6915.04 -10089.50 12231.75 235.57 3.04 MWD-IFR-MS 259 18048.27 93.72 178.63 30.92 9016.51 11815.07 -6945.89 -10088.57 12248.45 235.45 2.57 MWD-IFR-MS 260 18079.42 94.61 175.42 31.15 9014.25 11823.78 -6976.91 -10086.96 12264.75 235.33 10.67 MWD-IFR-MS . 261 18112.34 94.88 178.45 32.92 9011.53 11832.93 -7009.67 -10085.21 12281.97 235.20 9.21 MWD-IFR-MS 262 18143.50 94.51 177.49 31.16 9008.98 11842.13 -7040.70 -10084.11 12298.81 235.08 3.29 MWD-IFR-MS 263 18175.15 94.06 181.22 31.65 9006.61 11852.20 -7072.26 -10083.75 12316.61 234.96 11.84 MWD-IFR-MS 264 18207.85 93.92 182.04 32.70 9004.34 11863.83 -7104.86 -10084.68 12336.12 234.83 2.54 MWD-IFR-MS 265 18239.29 93.37 183.31 31.44 9002.34 11875.55 -7136.20 -10086.14 12355.39 234.72 4.39 MWD-IFR-MS 266 18270.40 94.51 180.36 31.11 9000.20 11886.72 -7167.22 -10087.14 12374.14 234.61 10.14 MWD-IFR-MS 267 18306.16 94.51 182.65 35.76 8997.39 11899.36 -7202.86 -10088.07 12395.58 234.47 6.38 MWD-IFR-MS 268 18334.96 95.23 180.71 28.80 8994.94 11909.62 -7231.54 -10088.92 12412.95 234.37 7.16 MWD-IFR-MS 269 18366.96 96 .26 183.33 32.00 8991. 74 11921.17 -7263.35 -10090.04 12432.42 234.25 8.76 MWD-IFR-MS 270 18401.57 97.48 181.20 34.61 8987.60 11933.78 -7297.69 -10091.40 12453.61 234.13 7.05 MWD-IFR-MS [(c)2004 IDEAL ID8_1C_01J . SCHLUMBERGER Survey Report 21-May-2004 10:28:16 Page 11 of 11 --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg / tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ --------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------- 271 18433.66 98.54 180.73 32.09 8983.13 11944.76 -7329.46 -10091.93 12472.69 234.01 3.61 MWD-IFR-MS 272 18461. 88 99.24 181.21 28.22 8978.76 11954.41 -7357.34 -10092.40 12489.47 233.91 3.00 MWD-IFR-MS 273 18494.45 100.16 181.85 32.57 8973.28 11965.80 -7389.43 -10093.26 12509.10 233.79 3.43 MWD-IFR-MS 274 18524.48 100.92 182.47 30.03 8967.78 11976.58 -7418.93 -10094.37 12527.44 233.69 3.24 MWD-IFR-MS 275 18584.00 102.43 182.47 59.52 8955.74 11998.16 -7477 .16 -10096.88 12564.04 233.48 2.54 Proj. to TD . [(c) 2004 IDEAL ID8 lC 01] - - . . . Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason Well No P-27 Date Dispatched: 24-Apr-04 Installation/Rig .1.1.1..1 Dispatched By: N. Rose 11.1 No Of Prints No of Floppies Surveys 2 1 I l/rvJ nliJ Please sign and return to: James H. Johnson Received By: BP Exploration (Alaska) Inc, v' Petrotechnical Data Center (LR2-1) ¡ ()c...-t - U~"C 900 E. Benson Blvd, Anchorage, Alaska 99508 ^ (] DM] Fax: 907-564-4005 e-mail address: johnsojh@bp.com LWD Log Delivery V1.1, 10-02-03 Schlumberger Private . . FRANK H. MURKOWSK/, GOVERNOR AI1ASIiA OIL AND GAS CONSERVATION COMMISSION 333 W, 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Bill Isaacson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay P-27 BP Exploration (Alaska) Inc. Permit No: 204-050 Surface Location: 2491' NSL, 3052' WEL, SEe. 31, TI1N, R13E, UM Bottomhole Location: 4834' SNL, 2343' EWL, SEC. 02, TlON, RI2E, UM Dear Mr. Isaacson: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you fÌ"om obtaining additional permits or approvals required by law fÌ"om other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to- withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable- proviswn of AS 3'1.05, Title 20', Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission t -tness any required test. Contact the C01IlII\ission's North Slope petroleum field inspector 65 07 (pager). Sin o~ BY ORDER q, THE COMMISSION DATED this,tt2day of March, 2004 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. WGft. ~(Hlu>otf " 1a. Type of work a Drill o Redrill rb. Current Well Class o Exploratory a Development 011 o MÜltiple Zone ORe-Entry o Stratigraphic Test o Service o Development Gas o Singlø Zone 2. Operator Name: 5. Bond: 181 Blanket o Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 2S100302630-277 PBU P-27 / 3. Address: 6. Proposed Depth: 12. Field I Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 18442 TVD 8978 Prudhoe Bay Field / Prudhoe Bay 4a, Location of Well (Governmental Section): 7. Property Designation: Pool Surface: ADL 028265 2491' NSL, 3052' WEL, SEC. 31, T11N, R13E, UM (Planned) 8. Land Use Permit: 13. Approximate Spud Date: Top of Productive Horizon: 1484' SNL, 1981' EWL, SEC. 02, T10N, R12E, UM April 15, 2004 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4834' SNL, 2343' EWL, SEC. 02, T10N, R12E, UM 2560 5712' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool Surface: x-631237 y- 5947218 Zone- ASP4 (Height above GL):Plan 83.9 feet P-20B is 3442' away 16. Deviated Wells: 17. Maximum Anticipated Pressures in psig (see 20 MC 25.035) Kickoff Depth 300 ft 0 psig Surface: 2864 psig /' Maximum Hole Angle 93 Downhole: 3726 18'i G~s'rgl?r99ram Specificatiori$ "ce~~ Size i ·acksf Hole Casina Weiaht Grade Couolina Lenath MD TVD MD TVD (includina staoe data) 42" 20" 91,5# H-40 Weld 80' Surface Surface 110' 110' 1260 sx Arctic Set (Aoorox.) 13-1/2" 10-3/4" 45.5# L-80 BTC 4719' Surface Surface 4719' 3356' 840 sx AS Lite, 342 sx Class 'G' 9-7/8" 7-5/8" 29.7# L-80 BTC-M 14916' Surface Surface 14916' 8885' 1052 sx Class 'G', 160 sx Class 'G' 6-314" 4-1/2" 12.6# L-80 IBT-M 3726' 14700' 8759' 18442' 8978' Uncemented Slotted Liner 19. PRE$IE!\I'f'Wt;LJ... CONDITION SUMMARY·('f'()·.~Ci.)mpl~tEldf()(.·R~dril!ANPR~~trY Opert:!ti(¡)~$) i Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft): Junk (measured): / J...eí"Íåthi iii §!~Eli. ii <. i(((M~. (( TVD / / . ....... ./ // !=:trll('h 'r::¡1 r.nnrluctor ~, .L In Prorlur.tinn I inAr Perforation Depth MD (ft): perfOration Depth TVD (ft): 20. Attachments 181 Filing Fee, $100 o BOP Sketch 181 Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis o Property Plat o Diverter Sketch o Seabed Report 181 Drilling Fluid Program 18120 MC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Neil Magee, 564-5119 Printed Name Bill Isaacson Title Senior Drilling Engineer L 11 J 3/ Ýð "/ Prepared By Name/Number: Sianature Phone 564-5521 Date Terrie Hubble, 564-4628 ·/i·. .i'· /.. ......... (i ii; ./. ;. /·/ii .i . Permit To Drill I API Number: Permit Approval I See cover letter for Number: ..2..e> 0/- Ò c;ó 50- a ~9- :z ~ .z.. ð-3 Date: other requirements Conditions of Approval: Samples Required DYes ~·No Mud Log Required DYes ~No Hydrogen S e Measures IKI Yes DNa Directional Survey Required ~Yes DNa ~eC(/},to 0 p~ /, n R I h I t\1 A I BY ORDER OF Date~,/b-~If Aooroved Bvl /1 { THE COMMISSION Form 10-401lRé"visea - Submit In Duplicate . STATE OF ALASKA . ALASKA ~ AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 1 0 ZOO 20 AAC 25 005 · . I Well Name: I P-27 / Drill and Complete Plan Summary I Type of Well (service I producer I injector): 1 Producer Surface Location: X = 631,237.00' Y = 5,947,218.00 As-Staked 2491'FSL, 3052'FEL, Sec. 31, T11N,R13E /' Target Location: X = 620,775,02' Y = 5,943,068.15' Top Sag River 3796 FSL, 3299' FEL, Sec. 2, T10N, R12E Bottom Hole Location: X = 621,195.00' Y = 5,939,724.00' 445' FSL, 2937' FEL, Sec. 2, T10N, R12E / I AFE Number: I PBD4P2210 1 1 Estimated Start Date: 14/15/2004 I ~ 18442' I I TVD: 18978' 1 I Rig: 1 Nabors 9ES / I Operating days to complete: 131.1 I RT/GL: 128.5' 1 I RKB: 183.9' 1 Well Design (conventional, slim hole, etc.): 13 String Horizontal Producer / 1 Objective: I Slotted liner completion into the Ivishak Zone 4 formation. / Productive interval is 3442' MD away from the nearest wellbore P-20B (producer). The well approaches within 5712' of the nearest Prudhoe Bay property line. c IT b" p aSln gJ U Ing rogram: Hole Csgl WtlFt Grade Conn Length Top Btm Size TbQ O.D. / / MDrrVD MDrrVD bkb 42" Insulated 20" 91.5# H-40 WLD 80' GL 11 0/11 0 13-1/2" 1 0-3/4" 45.5# L-80 BTC 4719' GL 4719/3356' 9-7/8" 7-5/8" 29.7# L-80 BTC-m 14,916' GL 14,916'/8885' 6-3/4" 4-1/2" Slotted 12.6# L-80 IBT-M 3726' 14700'/8759 18,442'/8978' Tubinq 4~" 12.6# 13Cr Vam Top 14700' GL 14700'/8759' 10-3/4" burst 5210 psi, collapse 2480 psi 7·5/8" burst 6890 psi, collapse 4790 psi 4-1/2" slotted liner. P-27 Drilling Program- AOGCC Page 1 . . Mud Program: Initial Base PF to to SV SV to TD 9.0 - 9.5 9.0- 9.5 9.0- 9.5 9-7/8" Intermediate Hole 4715' - 14916' : Interval Density YP PV pH (ppg) Upper 9.7 26-32 12-18 9.0-9.5 Interval TopofHRZ 11.1-. 26-28 16-22 9.0-9.5 to TSAG LSND API Filtrate 6-8 4-5.5 6-3/4 " Production Hole (14916' - 18442' : FloPro Interval Density YP PV pH API (ppg) Filtrate Sadlerochit 8.6 26-28 8-15 9.0-9.5 4-6 Hydraulics: Surface Hole: 13-1/2" Interval Pump Drill AV Pump PSI ECD Motor Jet Nozzles TFA GPM Pipe (fpm) ppg-emw ("/32) (in2) 0-2325' 750 5" 19.5# 90 1800 10.0 N/A 18,18,18,16 .942 2325'-4715' 750 5" 19.5# 110 2600 10.2 N/A 18,18,18,16 .942 Intermediate Hole: 9-7/8" Interval Pump Drill Pipe AV Pump PSI ECD Motor Jet Nozzles TFA GPM (fpm) ppg-emw ("/32) (in2) 4715' -14916' 650 5" 19.5# 216 3450 11.5 N/A 3x16,3x15 1.10 Production Hole: 6-3/4" Interval Pump Drill AV Pump PSI ECD Motor Jet Nozzles TFA GPM Pipe (fpm) ppg-emw ("/32) (in2) 14916' - 18442' 300 4" 15.7# 200 2800 10.6 N/A 6x10 .460 P-27 Drilling Program- AOGCC Page 2 . Directional: . Ver. I Anadrill(P4b) KOP: 1300' Maximum Hole Angle: 93 deg at 17,700' MD Close Approach Wells: All wells pass 1/200 major risk criteria. P-06 - 18' @ 480' P-07 - 17' @ 550' Gyro survey on standby for kick-off due to proximity of P-6 and P-7. IFR-MS corrected surveys will be used for survey validation. Lo Surface Drilling: Open Hole: Cased Hole: Drilling: Open Hole: Cased Hole: Drilling: Open Hole: Cased Hole: Intermediate Hole Production Hole Formation Markers: MWD/GR/RES (RES in recorded mode) None None MWD/GR/RES/PWD (RES in recoded mode) USIT Contin enc MWD/PWD/GR/RES/AIM (RES in recorded mode) None None Formation Tops TVDss Estimated pore pressure, PPG Base Permafrost 1970 SV4 2120 SV3 2616 SV2 2845 SV1 3171 UG4A 3674 UG3 3880 UG1 4395 Hydrocarbon bearinQ, 8.7 PPQ EMW WS2 Na 4892 Hydrocarbon bearinQ, 8.7 ppg EMW WS10a 5173 Hydrocarbon bearing, 8.7 ppg EMW CM3(Colville) 5410 CM2 5918 CM1 6774 THRZ 7043 TKNG 7635 TJF 7940 TJD 8328 TJB 8627 TSGR 8802 Hydrocarbon bearing, 8.2 ppg EMW TSHU 8828 TSAD(initial) 8918 Hydrocarbon BearinQ, 3762 psi, 8.1 ppg EMW P-27 Drilling program- AOGCC II.~ 8· {,p Page 3 . . TSAD crest TSAD @TD HOT OWC 8878 8910 8965 8978 EMW EMW / Test Point Surface Casing Shoe Testin : Depth 20' min from surface shoe Intermediate Casing Shoe 20' min from 7-5/8" shoe Test Type LOT FIT EMW 12.5 ppg EMW Target 10.5 ppg EMW Target based on 8.6 ppg MW and a worst case 10.0 d namic ressure Cement Calculations: The following surface cement calculations are based upon a single stage job using a port collar as a contingency if cement is not circulated to surface. Casin Size 10-3/4" Surface Basis: Lead: Based on conductor set at 110', 2215' of annulus in the permafrost @ 250% excess and 1750' of open hol 0 top of tail slurry to base permafrost @ 30% excess. Lead TOC: To rf e Tail: Based on ' , MD(>500'TVD) open hole volume + 30% excess + 80' shoe track volume. Tail TOC: At -3969' MD Total Cement Volume: Lead 4 .sks of Dowell ARTICSET Lite at 10.7 Tail sks of Dowell Premium 'G' at 15.8 ppg and will be cemented as follows: Tail P-27 Drilling Program- AOGCC Page 4 . . Well Control: Surface hole will be drilled with a diverter. The intermediate/production hole, well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon the planned casing test of 3500 psi for casing integrity considerations, the BOP equipment will be tested to 4000 psi./' Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Interval- · Maximum anticipated BHP: · Maximum surface pressure: 3726 psi @ 8802' TVDss - Top Sag 2864 psi @ surface · (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: · Planned completion fluid: 4000 psi (The casing and tubing will be tested to 3500) 8.5 ppg filtered brine / 6.8 ppg diesel / Disposal: · No annular disposal in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for disposal. Haul all Class I wastes to Pad 3 for disposal. P-27 Drilling Program- AOGCC Page 5 . . DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" insulated conductor is scheduled for installation in March 2004. 1. Weld an FMC landing ring for the FMC Ultra slimhole wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Rig operationS:~ì 1. MIRU Nabors . .. 2. Nipple up divJ· r spool and riser. PU 5" DP as required and stand back in derrick. 3. MU 13-1/2" drilling assembly with MWD/GR/RES (page 4) and directionally drill surface hole to approximately 100' TVD below the SV1 Sands. An intermediate wiper/bit trip to surface for a bit will be performed prior to exiting the Permafrost. 4. Run and cement the 10-3/4", 45.5# surface casing back to surface. A Tam port collar will be run as a / contingency if surface drilling is problematic. 5. ND riser spool and NU casing / tubing head. NU BOPE and test to 4000 psi. 6. MU 9-7/8" drilling assembly with MWD/LWD (page 5) and RIH to float collar. Test the 10-3/4" casing to 3500 psi for 30 minutes if not bumped to 3500 psi during displacement. 7. Drill out shoe joints and displace well to 9.7 ppg drilling fluid. Drill new formation to 20' below 10-3/4" shoe and perform Leak Off Test. 8. Drill to +/-100' above the HRZ, ensure mud is in condition to 11.3 ppg and perform short trip as needed. 9. Drill ahead to intermediate TD at Top Sag estimated at 14,916' MD/8885'TVD. 10. Run and cement the 7-5/8" intermediate casing. Test casing to 3500 psi. ./ 11. Set slips and pack-off after cement has reached 500 psi compressive strength. 12. Freeze protect the 7-5/8" x 10-3/4" annulus as required. Record formation breakdown pressure on the ./ Morning Report. 13. MU 6-3/4" drilling assembly with MWD/LWD (page 5). Drill new formation to 20' below 10-3/4" shoe and perform FIT ~o 10.5 ppg. 14. Drill ahead as per directional plan to proposed TD at 18,442' MD/8978'TVD. Short trip as required and / condition hole for running 4-1/2" liner. 15. Run 4-1/2" slotted liner. The liner will extend approximately 150' above the 7-5/8" shoe. Release from ...... liner and displace well to filtered 8.6 ppg filtered KCL brine and POOH. 16. Run a 4-1/2",12.6#, Vam Top, 13Cr completion assembly. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 17. Shear DCR valve and install TWC. 18. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Remove TWC. 19. RU hot oil truck and freeze protect well by pumping diesel to DCK shear GLM. Allow to equalize. / 20. Rig down and move off P-27 Drilling Program- AOGCC Page 6 . . P-27 Drilling Programme Job 1: MIRU Hazards and ~o t(ngencies ~ P-Pad i 0 esignated as an H2S site however offset wells to P-2?; P-06 and PoOl have indicate readings of up to 20 ppm in recent test (3/2002). Standard Operating Procedures for H2S precautions should be followed at all times. ~ The cellar area surrounding P-2? should be checked to insure level prior to move in. ~ Check the landing ring height on P-2? The BOP nipple up may need review for space out. Reference RPs .:. "Drilling! Work over Close Proximity Surface and Subsurface Wells Procedure" Job 2: Drillina Surface Hole ~ There are two close approach issues in the surface hole. P-06 approaches with a center to center distance of 18' at 480' and PoOl approaches within 17' at 550'. ~ Surface hole drilling has encountered heavy gravel at approximately 2000' which has required careful monitoring of spud mud carrying capacity. Refer to MI mud recommendation. Reference RPs .:. "Prudhoe Bay Directional Guidelines" .:. "Well Control Operations Station Bill" Job 3: Install Surface Casina Hazards and Contingencies / ~ It is critical that cement is circulated to surface for well integrity. 250% excess cement through the permafrost zone (and 30% excess below the permafrost) is planned. A 10-314" port collar will be available as a contingency if surface hole drilling is problematic. If used the port collar will be positioned at ±1000'MD to allow remedial cementing. ~ "Annular Pumping Away" criteria for future permitting approval for annular injection. 1. Pipe reciprocation during cement displacement 2. Cement - Top of tail >500' TVD above shoe using 30% excess. 3. Casing Shoe Set approximately 100'TVD below SV-1 sand. Reference RPs .:. "Casing and Liner Running Procedure" .:. "Surface Casing and Cementing Guidelines" .:. "Surface Casing Port Collar Procedure" P-2? Drilling Program- AOGCC Page? . . Job 4: Drillina Intermediate Hole Hazards and Contingencies ).- P-27 is expected to cross three faults in the intermediate hole section. The approximate location of the faults are as follows: Formation TVD Intersect Est. Throw Uncertainty UG4 (Possible) 3869 10' +1-250' UG2 4391 20-25' +1-250' UG1 4950' 20' +1-250' Kingak JG (Possible) 7882' 25-30' +1-250' Kingak JD 8469' 15' +1-250' ).- Lost circulation is considered a risk as offset wells have lost up to 1000 bbls in like faults at P- Pad. If losses/breathing is encountered, consult the Lost Circulation Decision Tree regarding LCM treatments and procedures and adjust drilling practices as necessary to reduce losses. A PWD is being run in the intermediate hole section to monitor hole cleaning and drilling practices. ).- Cretaceous overpressure was noted on the North side of the pad in wells P-24 and P-25 in 1997. The cretaceous interval required a 10.4 ppg mud weight to stabilize. ).- P Pad has a history of wellbore stability problems within the Kingak shales, particularly when faults were crossed in the Kingak. Stuck pipe incidents are noted on the pad data sheet. Correct selection of mud weight is critical to ensure Kingak shale stability. Problems have been encountered in both high and low angle wells, however high angle wells have been most problematic. Follow all shale drilling practices to limit high ECD's, and maintain proper mud weights and shale stabilizers in the drilling fluid ).- A mud weight of 11.1 ppg has been picked for drilling the Kingak portion of the intermediate hole. This is based on the inclination and azimuth applied to the Kingak Polar Plot. ).- KICK TOLERANCE: In the case scenario of 8.4 ppg pore pressure at the Top Sag River target depth (8885' tvd), gauge hole, a fract~:"~. .,e' radient of 12.5 ppg at the surface casing shoe, 11.3 ppg mud in the hole the kick tolerance is ~Dbls. An accurate LOT will be required as well as heightened awareness for kick detection. Contact Drilling Manager if LOT is less than 12.0 ppg. ).- Extreme care should be taken when picking the 7-5/8" casing point - Top Sag River. Lost circulation may be seen when the Sag River is penetrated with the 11.3 ppg intermediate hole mud. ~ There are no "major risk close approach" issues with the intermediate hole section of P-27. Reference RPs .:. Standard Operating Procedure for Leak-off and Formation Integrity Tests .:. Prudhoe Bay Directional Guidelines .:. Lubricants for Torque and Drag Management. .:. ERD Recommended Practice Section 5.2 " Operating Practices" .:. "Shale Drilling- Kingak & HrZ" P-27 Drilling Program- AOGCC Page 8 . . Job 6: Case & Cement Intermediate Hole Hazards and Contingencies }> The interval is planned to be cemented with a lead and tail slurry. The tail slurry will cover the shoe to 600' above the Top Sag and the tail will cover from 600' above the Top Sag to 500' above the UG1 interval. >- Several instances of packing off, stuck casing and the inability to reciprocate during cement jobs has occurred on P Pad. The SV and Ugnu sands will be exsposed to significant differential pressure. Lessons learned indicate that every attempt should be made to condition the hole and wiper trip sufficiently prior to running casing, ensure very tight fluid loss properties of the mud and that during casing running every effort must be made to keep the pipe moving. A casing running program will be jointly issued by the ODE and Drilling Supervisor detailing circulating points and running speed. In addition a LCM pill composed of "G Seal" may be placed across the WS and Ugnu to help arrest mud dehydration if losses were experienced while drilling this interval > Ensure the lower production cement has reached at least a 70BC thickening value prior to freeze protecting. Pump approximately Y2 volume of casing-casing annulus prior to freeze. After freeze protecting the 7-5/8" x 10-314" casing outer annulus with 63 bbls of dead crude (2200' MD, 2100'TVD), the hydrostatic pressure will be 7.7 ppg vs 8.5 ppg EMW of the formation pressure immediately below the shoe. Ensure a double-barrier at the surface on the annulus exists until the cement has set up for at least 12 hours. Reference RPs .:. "Intermediate Casing and Cementing Guidelines" .:. "Freeze Protecting an Outer Annulus" Job 7: Drill 6-3/4" Horizontal Production Hole Hazards and Contingencies >- There are no "close approach" issues with the production hole interval of P-27. }> P Pad has a history of lost circulation events while drilling in the Sadlerochit reservoir section. Losses have ranged from minor to severe (-34,000 barrels). All cases of severe losses have been fault related and were managed by pumping fiberous/carbonate LCM pills. Be prepared for losses by establishing a contingency plan and consulting the Lost Circulation Contingency plan attached. >- The East and West sides of the target polygon are bounded by faults The target polygon hardline is designed to maintain 150' standoff from these regions. >- There are two "potential" faults in the production hole section at 15,930' and 17,560' MD. Both have 10' of throw. }> The kick tolerance is Ge for the 6-3/4" open hole section assuming a kick from Zone 4B at -8,950' TVD ss. This f;~sed on an 8.2 ppg pore pressure, a minimum fracture gradient of 10.5 ppg at the 7-5/8" shoe, and 8.6 ppg mud in the hole. P-27 Drilling Program- AOGCC Page 9 . . ~ Under no circumstances add any LCM (including Walnut sweeps, cellulose material) other than calcium carbonate for losses < 50 BPH without prior discussions with the Drilling Engineer/Asset Production Engineer. Significant mud losses> 50 BPH may include the use of cellulose material to arrest losses. See LCM discussion in MI Mud Program. ~ Expect a certain amount of geo-steering , but significant changes to the planned directional profile should be discussed with the Drilling Manager/Operations Drilling Engineer. Reference RPs .:. "Standard Operating Procedure for Leak-off and Formation Integrity Tests" .:. "Prudhoe Bay Directional Guidelines" .:. "Lubricants for Torque and Drag Management" .:. ERD Recommended Practice Section 5.2 Operating Practices Job 9: Install 4%" Production Liner Hazards and Contingencies ~ Differential sticking could be a problem. The FloPro will be approximately 200 psi over balance to the Ivishak formation. Minimize the time the pipe is left stationary while running the liner. ~ In the event additional weight is required to get the liner to TD, have 6 stands of weight pipe in the derrick. ~ A liner inner string should not be required to help convey the liner to bottom. An inner string contingency however is included should open hole conditions be poor. ~ Keep in mind that the Ivishak interval will be open during liner running. Avoid introducing lighted than 8.6 ppg completion brines during swap over. Reference RPs .:. "Running and Cementing a Liner Conventionally" Job 12: Run Completion Hazards and Contingencies ~ Keep in mind that the production interval will be open during the running of the completion. Watch hole fill closely, verify no light fluids are introduced down hole and verify proper safety valves are on the rig floor while running this completion. ~ Shear valves have been failing at lower than the 2500 psi differential pressure. When testing annulus maintain no more than a 1500 psi differential. Avoid cycling pressure (pumping up and bleeding off) prior to activating shear valve as this is thought to cause shearing at lower pressures. ~ Review requirement for second barrier when freeze protecting well. This may entail a VR plug to be installed in the annulus valve. P-27 Drilling Program- AOGCC Page 10 · e Reference RPs .:. Completion Design and Running .:. Freeze Protection of Inner Annulus .:. Running and handling 13Cr Job 13: ND/NUlRelease Ria Hazards and Contingencies þ.> No hazards specific to this well have been identified for this phase of the well construction. Reference RPs .:. Freeze Protection of Inner Annulus P-27 Drilling Program- AOGCC Page 11 . e P-27 Well Summary of Drillinq Hazards POST THIS NOTICE IN THE DOGHOUSE Surface Hole Section: · Gravel beds below the Permafrost will tend to slough in when aerated (hydrate cut) mud is being circulated out. Ensure adequate mud viscosity is maintained to avoid stuck pipe situations. Intermediate Hole Section: · The intermediate hole section will be drilled with a recommended mud weight of 11.1 to 11.3 ppg to ensure shale stability in the Kingak shale. This mud weight is based on the angle and inclination applied to the Kingak Polar Plot to ensure hole stability. · Cretaceous overpressure was noted on the North side of the pad in 1997. Injection overpressure should no longer be an issue however crews should carefully monitor hole conditions when drilling below the Ugnu. · P-27 is expected to cross three faults in the intermediate hole section. Formation TVD Intersect Est. Throw Uncertainty UG4 (Possible) 3869 10' +1-250' UG2 4391 20-25' +1-250' UG1 4950' 20' +1-250' Kingak JG (Possible) 7882' 25-30' +1-250' Kingak JD 8469' 15' +1-250' Loss circulation is considered to be a risk. Consult the lost Circulation Decision Tree regarding LCM treatments and procedures. · Stuck pipe and packing off are hazards which may be encountered while running the 7-518" casing. The SV and Ugnu sands will be exposed to significant differential pressure due to the elevated mud weights required to stabilize the Kingak formation. Production Hole Section: · Mud losses have been encountered in offset horizontal sections. In particular P-26 lost 34,000 barrels of fluid while drilling this interval. Contingency LCM material and mud product should be available at the rigsite/mud plant. HYDROGEN SULFIDE - H2S / . This drill-site not designated as an H2S drill site. However wells tests indicate up to 20 ppm of H2S. As a precaution, Standard Operating Procedures for H2S precautions should be followed at all times. Version 1.0 Rigsite Hazards and Contingencies P-27 Proposed Completion Cellar Elevation = 48.0' Nabors 9ES RKB = 34.10' 10-3/4",45.5#/ft, L-80, BTC I 4719' BAKER 5" x 7-5/8" Baker Liner Tie Back Sleeve 'HMC' Hydraulic Liner Hanger 114716"1 / I 14916'1 7-5/8",29.7 #/ft, L80, BTC- Mod Date 2/12/04 TREE: FMC 4-1/16" 5M WELLHEAD: FMC Gen 5 System 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 2200' I 4-1/2" Camco Gas Lift Mandrels with handling pups installed. GAS LIFT MANDRELS TVD DEV TYÆ VLV LATCH 8500 KBG-2 Dum BK-5 7500 KBG-2 Dum BK-5 6300 KBG-2 Dum BK-5 5000 KBG-2 Dum BK-5 3750 KBG-2 Shear BK-5 3100 KBG-2 Dum BK-5 ST MD 1 2 3 4 5 6 PORT DATE PRODUCTION TUBING DETAILS 4-1/2",12.60# 13Cr, Yam Top Coupling OD: 4.932" DrifUID: 3.833"/3.958" 4-1/2" 'X' Landing Nipple with 3.813" @xxxx' 7-5/8" x 4-1/2" Baker 'S-3' Production Packer@xxxx' 4-1/2" 'X' Landing Nipple with 3.813" @xxxx' 4-1/2" 'XN' Landing Nipple with 3.750"@xxxx' 4-1/2" Mule-Shoe Guide spaced into 4-1/2" liner tie-back@xxxx' slotted liner from: Rev By Comments N. Magee Proposed Completion 4-1/2" 12.6 #/ft, L-80, 1ST slotted liner ./ 18,442' I Slotted liner G WELL: P-27 API NO: 50-029-xxxx-OO P-27 (P4b) Proposal Scbl Report Date: February 26. 2004 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 234.270" Field: Prudhoe Bay Unit, WOA Vertical Sec:tlon Origin: N 0.000 ft. E 0.000 ft Structure / Slot: P,PAD / P-27 Feasibility st dy TVD Reference Datum: Rotary Table Well: Plan P-27 TVD Reference Elevation: 83.91 ft relative to MSL Borehole: Pian P-27 Sea Bed I Ground level Elevation: 55.41 ft relative to MSL UWl/API#: 50029 Magnetic Declination: 25.143" Survey Name I Date: P-27 (P4b) / February 26. 2004 Total Field Strength: 57575.013 nT Tort / AHD / 001/ ERD ratio: 231.546" /14935.05 ft/ 6.849 /1.654 Magnetic Dip: 80.810" Grid Coordinate System: NAD27 Alaska State Planes, Zone 04. US Feet Declination Date: April 25, 2004 Location Lat/Long: N 70.26389862. W 148.93894834 Magnetic Declination Model: BGGM 2003 . Location Grid N/E YIX: N 5947218.000 ftUS. E 631237.000 ftUS North Reference: True North Grid Convergence Angle: +0.99873637" Total Corr Mag North -> True North: +25.143" Grid Scale Factor. 0.99991957 Local Coordinates Referenced To: Well Head Comments RTE KOP Bid 2/100 Cry 3/100 600.00 7.21 280.37 599.31 515.40 9.76 17.16 5.62 -16.07 3.00 2.87 -8.92 -12.95G 5947223.34 631220.84 N 70.26391398 W 148.93907823 700.00 10.16 276.55 698.16 614.25 20.64 32.25 7.76 -31.01 3.00 2.95 -3.81 -9,18G 5947225.22 631205.87 N 70.26391982 W 148.93919899 800.00 13.13 274.45 796.09 712.18 35.84 52.43 9.65 -51.09 3.00 2.97 -2.11 -7.12G 5947226.75 631185.75 N 70.26392498 W 148.93936137 900.00 16.11 273.11 892.84 808.93 55.33 77.67 11.28 -76.27 3.00 2.98 -1.34 -5.82G 5947227.95 631160.55 N 70.26392944 W 148.93956493 1000.00 19.10 272.18 988.15 904.24 79.05 107.90 12.65 -106.48 3.00 2.99 -0.93 -4.93G 5947228.80 631130.33 N 70.26393319 W 148.93980910 1100.00 22.09 271.49 1081.75 997.84 106.93 143.07 13.77 -141.63 3.00 2.99 -0.69 -4.29G 5947229.29 631095.17 N 70.26393623 W 148.94009323 1200.00 25.08 270.96 1173.39 1089.48 138.90 183.07 14.61 -181.62 3.00 2.99 -0.53 -3.81G 5947229.44 631055.17 N 70.26393854 W 148.94041653 1300.00 28.07 270.54 1262.81 1178.90 174.87 227.80 15.19 -226.35 3.00 2.99 -0.42 -3.43G 5947229.24 631010.44 N 70.26394012 W 148.94077811 1400.00 31.07 270.19 1349.78 1265.87 214.75 277.15 15.50 -275.69 3.00 3.00 -0.35 -3.13G 5947228.69 630961.10 N 70.26394096 W 148.94117699 Cry 2/100 1464.49 33.00 270.00 1404.44 1320,53 242.48 311.35 15.56 -309.90 3.00 3.00 -0.30 -27.36G 5947228.15 630926.90 N 70.26394111 W 148.94145350 1500.00 33.63 269.41 1434.12 1350.21 258.37 330.86 15.46 -329.40 2.00 1.78 -1.66 -26.87G 5947227.71 630907.41 N 70.26394083 W 148.94161116 . 1600.00 35.43 267.85 1516.50 1432.59 305.17 387.53 14.09 -386.06 2.00 1.79 -1.56 -25.59G 5947225.35 630850.79 N 70.26393708 W 148.94206919 1700.00 37.24 266.42 1597.06 1513.15 354.94 446.78 11.11 -445.23 2.00 1.81 -1.43 -24.44G 5947221.35 630791.68 N 70.26392894 W 148.94254748 1800.00 39.07 265.11 1675.69 1591.78 407.61 508.55 6.54 -506.83 2.00 1.83 -1.31 -23.40G 5947215.70 630730.18 N 70.26391644 W 148.94304545 1900.00 40.91 263.90 1752.31 1668.40 463.14 572.81 0.37 -570.79 2.00 1.84 -1.21 -22.47G 5947208.42 630666.34 N 70.26389958 W 148.94356250 2000.00 42.76 262,77 1826.81 1742,90 521.44 639.50 -7.38 -637.03 2.00 1.85 -1.13 -21.63G 5947199.52 630600.25 N 70.26387839 W 148.94409799 2100.00 44.63 261.72 1899.11 1815.20 582.45 708.58 -16.71 -705.48 2.00 1.86 -1.05 -20.88G 5947189.00 630531 .98 N 70.26385289 W 148,94465127 2200.00 46.50 260.74 1969.12 1885.21 646.09 779.98 -27.60 -776.04 2.00 1.87 -0.98 ,20.19G 5947176.88 630461.63 N 70.26382311 W 148.94522167 End Cry 2279.78 48.00 260.00 2023.27 1939.36 698.70 838.56 -37.41 -833.79 2.00 1.88 -0.93 O.OOG 5947166.07 630404.05 N 70.26379631 W 148.94568856 Base Perm 2325.57 48.00 260,00 2053,91 1970.00 729.35 872.59 -43.31 -867.30 0.00 0.00 0,00 O.OOG 5947159,58 630370,66 N 70.26378016 W 148.94595942 Cry 4/100 2445.26 48.00 260.00 2134.00 2050.09 809.48 961.54 -58,76 -954.90 ~.OO 0.00 0.00 -39.00G 5947142.61 630283,35 N 70.26373793 W 148.94666752 2500.00 49.72 258,19 2170.02 2086.11 846.89 1002.76 -66.56 -995.37 4.00 3.14 -3.30 -37.81G 5947134.10 630243.02 N 70.26371660 W 148.94699470 SV4 2553.36 51.41 256.52 2203.91 2120.00 884.80 1043.97 -75.59 -1035,58 4.00 3.18 -3.14 -36.74G 5947124.38 630202,98 N 70.26369192 W 148.94731971 2600.00 52.92 255.12 2232.52 2148.61 919.06 1080.80 -84.62 -1071.29 4.00 3.22 ,3.00 -35.89G 5947114.73 630167.43 N 70.26366725 W 148.94760838 Well Design Ver 3.1RT-SP3.03-HF4.00 Bld( d031rt-546) P-27\Plan P-271Plan P-27\P-27 (P4b) Generated 2/26/2004 3:31 PM Page 1 of 3 Comments End Cry 2756.92 56.15 250.74 2322.45 2236.54 1043.16 1211.76 -123.20 -1196.40 4.00 3.32 -2.65 O.OOG 5947073.96 630043.03 N 70.26356160 W 146.94661966 SV3 3474.23 58.15 250.74 2699.91 2616.00 1625.84 1819,37 -323.63 -1770.00 0.00 0.00 0,00 O.OOG 5946863,60 629473.05 N 70.26301393 W 148.95325613 SV2 3908. 19 58.15 250.74 2928.91 2845.00 1979,34 2188.00 -445.22 -2118.00 0,00 0.00 0.00 O.OOG 5946735.97 629127.26 N 70,26268149 W 148.95606888 SV1 4525.98 58,15 250.74 3254.91 3171.00 2482.58 2712.77 -618.33 -2613.40 0.00 0,00 0.00 O.OOG 5946554.27 628634.99 N 70,26220816 W 148.96007289 9-5/8" Csg PI 4715.49 58.15 250.74 3354.91 3271.00 2636.95 2873.75 -671.43 -2765.37 0.00 0.00 0.00 O.OOG 5946498.53 628483,98 N 70.26206294 W 148.96130108 UG4 5479.20 58,15 250.74 3757.91 3674,00 3259.06 3522.47 -885.41 -3377. 78 0.00 0.00 0.00 O,OOG 5946273.92 627875.44 N 70.26147766 W 148.96625051 UG3 5869.58 58.15 250.74 3963.91 3880.00 3577.06 3854.07 -994.80 -3690.82 0.00 0.00 0.00 O.OOG 5946159.11 627564.38 N 70.26117842 W 148.96878038 UG1 6845.53 58.15 250.74 4478.91 4395.00 4372,06 4683.09 -1268.26 -4473.44 0,00 0.00 0.00 O.OOG 5945872.07 626786,72 N 70.26043019 W 148,97510474 WS2 7787.38 58.15 250.74 4975.91 4892,00 5139.27 5483. 12 -1532,16 -5228.70 0.00 0.00 0.00 O,OOG 5945595.07 626036.23 N 70.25970789 W 148.98120762 WS1 8319.89 58.15 250.74 5256,91 5173.00 5573.05 5935.46 -1681,37 -5655.71 0.00 0,00 0.00 O.OOG 5945438.45 625611.92 N 70.25929942 W 148.98465795 CM3 8769,02 58.15 250.74 5493.91 5410.00 5938,90 6316.97 -1807.21 -6015.87 0,00 0.00 0.00 O.OOG 5945306.36 625254.04 N 70.25895486 W 148.98756791 . CM2 9731.71 58,15 250.74 6001.91 5918,00 6723.09 7134.71 -2076.96 -6787,84 0.00 0,00 0.00 O,OOG 5945023.22 624486.95 N 70.25821614 W 148.99380496 CM1 11353.88 58.15 250.74 6857,91 6774.00 8044.49 8512.64 -2531.49 -8088.65 0.00 0.00 0.00 O.OOG 5944546.13 623194.37 N 70,25697088 W 149.00431363 Top HRZ 11863.65 58.15 250.74 7126.91 7043.00 8459.74 8945.66 -2674.32 -8497.43 0,00 0.00 0,00 O.OOG 5944396.20 622788.17 N 70.25657943 W 149.00761574 Cry 2/100 12395.36 56.15 250.74 7407.50 7323.59 6692.66 9397.34 -2623.31 -8923.62 0.00 0.00 0.00 -169.12G 5944239.62 622364.47 N 70.25617105 W 149.01105997 12400.00 56.06 250.72 7409.94 7326.03 6696.65 9401.26 -2624.61 -6927.53 2.00 -1.96 -0.44 -169.11G 5944236.46 622360.79 N 70.25616750 W 149.01106969 12500.00 56.10 250.26 7464.29 7360,36 6977.24 9465.20 -2652.63 -9006.65 2.00 -1.96 -0.46 -166.66G 5944209.06 622262.16 N 70.25609066 W 149.01172696 End Cry / Tgt 1 12555.90 55.00 250.00 7495.91 7412.00 9021,56 9531.29 -2666,30 -9050.00 2.00 -1.96 -0.47 O.OOG 5944192.64 622239.11 N 70.25604774 W 149.01207913 Top K/ngak 12944.69 55.00 250.00 7718,91 7635.00 9328.13 9849.77 -2977,23 -9349.27 0.00 0,00 0.00 O.OOG 5944078.52 621941.81 N 70,25574916 W 149.01449637 Cry 2/100 13129.69 55.00 250.00 7625.02 7741.11 9474.00 10001.31 -3029.06 -9491.66 0.00 0.00 0.00 -103.22G 5944024.22 621600.34 N 70.25560706 W 149.01564656 13200.00 54.69 246.32 7665.51 7761.60 9529.55 10056.60 -3049.50 -9545.40 2.00 ,0.44 -2.39 -102.26G 5944002.65 621746.99 N 70.25555103 W 149.01606045 13300.00 54.29 245.92 7923.60 7639.69 9606.90 10140.19 ,3061.15 -9620.36 2.00 ,0.40 -2.41 -100.66G 5943969.90 621672.57 N 70.25546432 W 149.01666607 13400.00 53.94 243.49 7962.22 7696.31 9666.57 10221.21 -3115.76 -9693.62 2.00 -0.35 -2.43 -99.43G 5943934.02 621599.95 N 70.25536950 W 149.01727752 TJF 13470.63 53.72 241.76 8023.91 7940.00 9744.97 10278.22 -3141.98 -9744,25 2.00 -0.31 -2.45 -98.41G 5943906,93 621549.80 N 70.25529770 W 149.01768630 13500.00 53.63 241.03 6041.31 7957.40 9766.46 10301.66 ,3153.31 -9765.02 2.00 -0.29 -2.46 -97.99G 5943695.24 621529.22 N 70.25526666 W 149.01765407 13600.00 53.36 236.57 6100.79 6016.68 9646.46 10362.27 -3193.74 -9634.50 2.00 -0.25 -2.47 -96.52G 5943653.61 621460.47 N 70,25515596 W 149.01641503 13700.00 53.16 236.06 6160.56 6076.67 9926.50 10462.42 -3237.00 -9901.96 2.00 -0.20 -2.46 -95.03G 5943609.17 621393.76 N 70.25503753 W 149.01695971 13600.00 53.03 233.59 6220.62 6136.71 10006.45 10542.39 -3263.05 -9967.34 2.00 -0.15 -2.49 -93.54G 5943762.00 621329.22 N 70.25491149 W 149.01946745 13900.00 52,93 231.09 6260.64 6196.93 10066.24 10622.23 -3331.63 -10030.54 2.00 -0.10 -2.50 -92.03G 5943712.13 621266.69 N 70.25477601 W 149.01999761 14000.00 52.69 226.56 6341.15 6257,24 10167.76 10702.00 ,3363.27 -10091.49 2,00 -0.04 -2.51 ,90.52G 5943659.64 621206.64 N 70.25463725 W 149.02046955 14100.00 52.90 226.07 6401.49 6317.56 10246.92 10761.74 -3437.32 -10150.12 2.00 0.01 -2.51 -69.01G 5943604.56 621149.17 N 70.25446936 W 149.02096269 TJD 14117.28 52.90 225,64 8411.91 8328,00 10260.55 10795.53 -3446.92 -10160.01 2,00 0.04 -2.51 -88.74G 5943594,81 621139.45 N 70.25446312 W 149.02104250 . 14200.00 52.96 223.57 6461.76 6377.67 10325.61 10661.53 -3493.91 -10206.35 2.00 0.07 -2.51 -67.50G 5943547.03 621093.94 N 70.25433456 W 149.02141645 14300.00 53.07 221.07 6521.94 6436.03 10403.75 10941.40 -3552.96 -10260,12 2.00 0.11 -2.50 -65.99G 5943467.05 621041.21 N 70.25417304 W 149.02165027 14400,00 53.24 216.56 6561.91 6496,00 10461.23 11021.42 -3614.42 -10311.36 2.00 0.17 -2.49 -64.50G 5943424.71 620991.05 N 70.25400496 W 149.02226362 14500.00 53.46 216.10 6641.62 6557.71 10557.97 11101.64 -3676.19 -10360.01 2.00 0.22 -2.46 -83.02G 5943360.10 620943.52 N 70.25383054 W 149.02265601 14600.00 53.72 213.64 6700.96 6617.07 10633.67 11162.12 -3744.22 -10406.01 2.00 0.27 -2.46 ,61.56G 5943293.29 620696.66 N 70.25365000 W 149.02302695 TJB 14616.79 53.77 213.23 8710.91 8627.00 10646,52 11195,66 -3755.52 -10413.47 2.00 0,30 -2.45 -81.31G 5943281.87 620891.42 N 70.25361909 W 149.02308710 14700.00 54.04 211.19 6759.93 6676.02 10706,63 11262.69 -3612.41 -10449.31 2.00 0.32 -2.44 -60.11G 5943224.37 620656.59 N 70.25346355 W 149.02337599 14600.00 54.41 206.77 8818.39 8734.48 10782.77 11344.02 -3882.67 -10489.84 2.00 0.37 -2.42 -78.70G 5943153.41 620617.29 N 70.25327142 W 149.02370271 14900.00 54.83 206.37 8876.30 8792.39 10855.60 11425.55 -3954.94 -10527.57 2.00 0.42 -2.40 -77.31G 5943080.50 620780.83 N 70.25307385 W 149.02400671 Top Sag River 14916.69 54.90 205.97 8885.91 8802.00 10867,64 11439.20 -3967. 19 -10533.59 2.00 0.44 -2.38 -77.08G 5943068. 15 620775.02 N 70.25304036 W 149.02405521 End Cry 14916.77 54.90 205.97 8885.95 8802.04 10867.70 11439.26 -3967.25 -10533,62 2.00 0.45 -2.38 O.OOG 5943068.09 620775.00 N 70.25304020 W 149.02405543 7"CsgPI 14916.87 54.90 205.97 8886.01 8802. 10 10867,77 11439.34 -3967.32 -10533.65 0.00 0.00 0.00 O.OOG 5943068.02 620774,96 N 70.25304001 W 149.02405571 Cry 14/100 14931.77 54.90 205.97 8894.58 8810.67 10876.50 11451.54 -3978.28 ,10538.99 0.00 0.00 0.00 -3.28G 5943056.97 620769.82 N 70.25301004 W 149.02409873 WellDesign Ver 3.1RT-SP3.03-HF4.00 Bld{ d031rt-546) P-27\Plan P-27\Plan P-27\P-27 (P4b) Generated 2/26/2004 3:31 PM Page 2 of 3 Comments Top Shublik End Cry Cry 10/100 15300,00 81.32 189.92 8997.61 8913.70 11172.81 11801.46 -4302.00 -10668.67 10.00 2.11 -9.92 -77,OOG 5942731.07 620645.81 N 70.25212517 W 149.02514282 Top Sad/rochl! 15329.57 82.00 187.01 9001,90 8917.99 11193.20 11830.72 -4330,93 -10672.98 10.00 2.29 -9.84 -76.58G 5942702.07 620642,01 N 70.25204612 W 149.02517725 Tgt 2 1 Cry 8/100 15329.64 82.00 187,00 9001.91 8918.00 11193.25 11830.78 -4331.00 -10672.99 10.00 2.32 -9.82 -77.61G 5942702.00 620642,00 N 70.25204593 W 149.02517732 15400.00 83.24 181.46 9010.95 8927,04 11238.05 11900.56 -4400.56 -10678.13 8.00 1.77 -7.87 -76.90G 5942632.36 620638.07 N 70.25185587 W 149.02521807 15500.00 85.11 173.64 9021.11 8937.20 11292.59 12000.04 -4499.87 -10673.88 8.00 1.87 -7.82 -76.10G 5942533.15 620644.05 N 70.25158457 W 149.02518257 15600.00 87.07 165.87 9027.93 8944.02 11335.48 12099.81 -4597.97 -10656.14 8.00 1.96 -7.77 -75.57G 5942435.39 620663.49 N 70.25131665 W 149.02503818 15700.00 89.09 158.12 9031.29 8947.38 11365.88 12199.74 -4692.94 -10625.27 8.00 2.01 -7.75 -75.31G 5942340.98 620696.01 N 70.25105731 W 149.02478772 End Cry 15775.24 90.62 152.30 9031 .48 8947.57 11380.15 12274,98 -4761.21 -10593.74 8.00 2.03 -7.74 O,OOG 5942273.27 620728.72 N 70.25087091 W 149.02453222 . Cry 6/100 15942.96 90.62 152.30 9029.67 8945.76 11403.59 12442.69 -4909.70 -10515.79 0.00 0.00 0.00 91.40G 5942126.17 620809.25 N 70.25046554 W 149.02390076 16000.00 90.53 155.72 9029.10 8945.19 11413.24 12499.73 -4960.97 -10490.80 6.00 -0.15 6.00 91.44G 5942075.35 620835.12 N 70.25032558 W 149.02369830 Tg!3 16021.29 90.50 157.00 9028.91 8945.00 11417.70 12521.02 -4980.47 -10482.26 6,00 -0.15 6.00 9.64G 5942056.00 620844.00 N 70.25027233 W 149.02362911 16100.00 95.16 157.79 9025.03 8941.12 11435.54 12599.61 -5053.02 -10452.05 6.00 5.92 1.01 9.68G 5941983.99 620875.46 N 70.25007424 W 149.02338428 End Cry 16124.48 96.60 158.04 9022.52 8938.61 11441.29 12623.96 -5075.58 -10442.90 6.00 5.91 1.02 O.OOG 5941961.60 620885.01 N 70.25001264 W 149.02331008 Cry 6/100 16546.77 96.60 158.04 8973.96 8890.05 11541.14 13043.45 -5464.64 -10286.04 0.00 0.00 0.00 174.28G 5941575.37 621048.61 N 70.24895035 W 149.02203859 16600,00 93.42 158.36 8969.31 8885.40 11553.91 13096.47 -5513.87 -10266.35 6.00 -5.97 0.60 174.31G 5941526.49 621069.16 N 70.24881592 W 149.02187899 16700.00 87.45 158.95 8968.54 8884.63 11578.75 13196.42 -5606.97 -10229.97 6.00 -5.97 0.59 174.31G 5941434.05 621107.15 N 70.24856172 W 149.02158412 Tgt 4 1 Cry 5/100 16707.61 87.00 159.00 8968,91 8885.00 11580.68 13204.02 -5614.07 -10227.24 6.00 -5.97 0.60 110.34G 5941427.00 621110.00 N 70.24854234 W 149.02156201 16800.00 85.40 163.34 8975.03 8891.12 11607.47 13296.21 -5701.29 -10197.50 5.00 -1.73 4.70 110.06G 5941340.31 621141.26 N 70.24830415 W 149.02132078 End Cry 16828.34 84.92 164.68 8977 .42 8893.51 11617.01 13324.44 -5728.44 -10189,72 5.00 -1.71 4.72 O.OOG 5941313.31 621149.51 N 70.24823003 W 149.02125767 Cry 5/100 17140.38 84.92 164.68 9005.05 8921.14 11725.40 13635.26 -6028.21 -10107.61 0.00 0.00 0.00 80.14G 5941015.04 621236.83 N 70.24741136 W 149.02059110 17200.00 85.44 167.63 9010.07 8926.16 11747.54 13694.67 -6085.89 -10093.39 5.00 0.87 4.94 79.89G 5940957.62 621252.05 N 70.24725385 W 149.02047566 17300.00 86.33 172.56 9017.25 8933.34 11790.98 13794.41 -6184.11 -10076.24 5.00 0.89 4.93 79.54G 5940859.72 621270.91 N 70.24698557 W 149.02033605 17400.00 87.25 177.48 9022.85 8938.94 11842.01 13894.25 -6283,55 -10067.58 5.00 0.92 4.92 79.26G 5940760.46 621281.30 N 70.24671395 W 149.02026501 17500.00 88.19 182.40 9026.83 8942.92 11900.26 13994.17 -6383.43 -10067.47 5.00 0.94 4.91 79.06G 5940660.60 621283.14 N 70.24644106 W 149.02026308 Tgt 5/ Cry 4/100 17584.80 89.00 186.56 9028.91 8945.00 11954.98 14078.95 -6467.94 -10074.09 5.00 0.95 4.91 O.OOG 5940576.00 621278.00 N 70.24621019 W 149.02031563 17600.00 89.61 186.56 9029.09 8945.18 11965.20 14094.14 -6483.03 -10075.83 4.00 4.00 0.00 O.OOG 5940560.88 621276.53 N 70.24616894 W 149.02032949 17700.00 93.61 186.56 9026.29 8942.38 12032.45 14194.08 -6582.32 -10087.25 4.00 4.00 0.00 O.OOG 5940461.42 621266.84 N 70.24589766 W 149.02042065 End Cry 17701.27 93.66 186.56 9026.21 8942.30 12033.31 14195.35 -6583.58 -10087.39 4.00 4.00 0.00 O.OOG 5940460.15 621266.72 N 70.24589421 W 149.02042181 TD / 4-1/2" Lnr 18442.48 93.66 186.56 8978.91 8895.00 12531.07 14935.05 -7318.43 -10171.94 0.00 0.00 0.00 O,OOG 5939724.00 621195.00 N 70.24388632 W 149.02109663 e Leaal DescriDtion: Northina IYI IftUSl Eastina IXI IftUSl Surface: 2491 FSL 3052 FEL S31 T11N R13E UM 5947218.00 631237,00 Tg! 1 : 4897 FSL 1816 FEL S2 T10N R12E UM 5944192.64 622239.11 Tg!2 : 3432 FSL 3438 FEL S2 T10N R12E UM 5942702.00 620642.00 Tg!3 : 2783 FSL 3248 FEL S2 T10N R12E UM 5942056.00 620844.00 Tg!4 : 2150 FSL 2992 FEL S2 T10N R12E UM 5941427.00 621110.00 Tgt5 : 1296 FSL 2839 FEL S2 T10N R12E UM 5940576.00 621278.00 TD/BHL: 445 FSL 2937 FEL S2 T10N R12E UM 5939724.00 621195.00 Well Design Ver 3.1RT-SP3.03-HF4.00 Bld( do31rt,546) P-27\Plan P-27\Plan P-27\P-27 (P4b) Generated 2/26/2004 3:31 PM Page 3 of 3 lumberger L: - P-27 (P4b) FIELD Prudhoe Bay Unit - WOA ~ STRUCTURE P-PAD - - ~.p~m.... 1;;;;;;""'""'"- NAD27 Alaska Statl! Planes, Zooe 04. us Feet Miscellaneous Model: BGGM2003 Dip 80.810' Data: April 25,2004 Lat N701550.035 NOfthing: 5947218.00flUS GridConv: +0.99873637' Slot: P~7 TV!) Ref: Rotary Table (83.91 11. abcwe MSL) _MagDec: +25.143' FS; 57575.0nT lon: W1485620.21 Easting: 631231.00ftUS Scale Fact 0.9999195653 Plan: p~ SrvyDate:F~OO4 - 0 1600 3200 4800 6400 8000 9600 11200 12800 . e o 1600 8000 3200 4800 6400 " . " . " . . . >.......<,~ .........,.... .......,.~,.,> ., " · " 00 ¡ ¡ ¡ · ." · "" , " " . , . , '. , '. · '" ¡ 10' ¡ ! .' ¡ · > . , . > · > . > > , · """ ; ; 1 ¡ ~ ~ ~ ' '" ^ . . · '" ^ . . " ", ^ . . ... "7"-" -.. -..-..-.. .....-..- ...... .-..-:"............. ..-..-. '- "_"_H_': -..-..-.. -..-..-..... "-"-"; ..-..-.. _. ......_.._.. _.._., _: ......_.._ ......._.._.. _. '_"_';_' ._......._ "_"_"_" _"_";" "'H_' : :::::: ' """ ,,,.,2.,... ....",..,., >. ,,,,,,...., ......, ... ....."".,... ..... . ......"""... ....".",.. .....:....,.. ,.......... 'H'"'' .,'.., ....L..,.,.. .......','.. .......... _, ,..t...". ............ _ _ ,.....,,,,,. ....~....,"" ..H....'" 'H......" '" ,..t.... ..... ' . < . . . ^ . . . . . ^ v ...... ....-..... .......-.. -. .-............ -...... _. .-.......-.. -..-.. -.. ..-..... .......-..... ........-...... .-........... ,-.......-.. -.......-.. -.......-..... ..-..-.. -. .-.......... ...........-.. -.......-,. ",..",..-..", ..-..-...... ......-...... .-..-...... ' """ · "'" · ...., · "'" ...... i" ......... ......-..- .......""..-....., ""..-.. - ..""··.....1.....··-··......- "1''' ............. t............. .....··........··........··-..t.. ............. ..-..-...... '.............t·...··... ................. "".......... ·..·..i-· ......... ··........··...............""··i·· ......... · ...... · '..... ... ''':'''-'' _.. -.......-.. _.....,....... -, ...,....... -.......-.. -;.. -..-.. -.......- ...... ....... _.~ -..-....... -.......-.. .....-....... ':" ..-..-..... ............-..... ....... -Z' -.......-. .-..-..-...... ..........:-. '_AA_" - "_AA""'''''' _""'0' "':;" ......... · """ · "'" · ...., · """ · ..... · ..... · ..'o., ' ...... · '0.... · '..... ..................................................., .......................................................................-..............,.....-...........................-...........,....................................-................._...........~..........""............_............................... " ...... · ""'" · """ · . ." · . " · , . . " "" " ...... "..~........."...",.................... ,.....................~.^^"''"........."..........,......"{,............... ..···........~,·..",..,......·..··..·..·..........t..···..,''',..··,..,..·......·..'....»."'............".."........."''''1;"......'' · ...... · ...... · .'.... · """ ¡ ! ¡ : Cry 2I10Q : ! . .+.- ..-.. ....... ..-..... ..... ...-........-. 'oj"."." -..... -............ ·¡·"·"-"·"·"Ct.xr·' '-": . -... ..-¡.-..-..... -"."-".,,.. ,. "j."."-".".' .-.. -.. ·"-"1 .....-. j----.--.--- -·----j-·-------·-t----·---'t··-·· ''''''''·'---··---··-1--·----··--··-1--· ." 1"- «-« ...-« -" ."-".".' -..-... "·"·"1"-"-" -. ........', ...... - t .... ..-.. -........ - ........ t' .-..... - ïÕ¡j'rongaK· ......,. ........... ...... 1"' '."."-" ...-.. -.. ·"·"1" ..... ......t'u*'i'..Jj;..,....~.".ui'..ð.v.........UN""V..." .uü·"'........'....U.'lN····i··N.'''''''...................''''.................u'''''''''...·t..............."'...........<'4o''''''...v...··...·''''.....''''····f'·.....'<'o!''''...··...,·..·.'··...v.....tj~'o^o'u....""r· ...·'.........··y··,·...<W...É~~··ê~··....."":.f......··.'··..&I........·......···<'''''.......··'.......".'....t...·.·.·.'u.. : "" 7 ¡Csg Cry 6/100 ' ¡ : ¡ ¡ : Cry 1· Tgt 4/ Cry 5/1ÔO "!"- ".".".".".". «.... . ......... "."'1".' .-.... '."."-' '·"·"·7·"· .........«.... «.. ...-;..-..-..... .... ........ ·"T~ö""·" ... '... -. !ë;;; ·1~ìia1;ñí'·"r· ..... : : ¡ ¡ ¡ I' TD/4-fI2"Lnr .."!'.. -................ .............. .......... ...............-.. .....~..... ................. ..............._.._.~..............._.,_.. -........... .-..!"....... ....."'.._.........................~. ..... ìJS··-··..·· ...........~. .....'! .......... ,t~;;.$t.tn8~ =II.na~t.".,'. .~I.t .t;.¡I. I~t~.;UIU.!t.u.~I.n.1;.¡.I.,~.;;.$¡..H.t;.II.,11111:t;.lt.f'~¡t.fA.$~~J.$I5:! .~~$hT~,.~,.¡1811.,~., 181 =.II~ ".tUIII ..'!..-.......-.......................-..... .........._......._..~....................._.._.......-.....¡_......................-..-.......-..¡......aµ. D(ß{. .Oll UTþp-sàêJÎrÓchÎi'::;"-' ~ ""'1"-""" : , : : EndCrv ......... , : : : ¡ Cry 10/100' . End Cr I ¡ ¡ : ! Tot 2/ Cry 8/101 Tgt 5/ Cri 4/100 12800 11200 9600 8000 6400 4800 1600 3200 ¡¡,K o o 1600 3200 4800 6400 8000 e- O o <0 ~ ê '=' ~ II Q) (ij () (f) D ~ Schlumberger L: P-27 (P4b) IElD Prudhoe Bay Unit - WOA ~ S","CWRE P.PAD - [::p..m"". S~Location NAD27 Alaska Stale Planes, Zone 04, us Feat Miscellaneous Model; BGGM2003 Dip: 80.810' D..· Apti125,2004 I Lat: N701550.035 NorttW\g" 5'<147218.00 !\.US GridConv: +{).99873637' Slot: P~7 TVD Ref: Rotary Table (83.9111 aboVe MSL) ~Dec:+25.143· FS: 57575.0nT Lon: W1485620.214 e:asting: 631237.00ftUS Scala Fact: 0.9999195653 Plan: p-~ ~ - -1 0500 -9000 -7500 -6000 -4500 -3000 -1500 0 - , . · , · , 0 ...,H...".. "'+.." · , . "....!"'" ""T'" 0 ..f"" RTE . ¡ , ¡ I ~ En~ Cry -1500 "."u""""""",,,^,, -1500 , , , , , . · , · . , , , , · , , . · . · , . · , , ^ · , . , . , ^ ' . , , , , ^ ' , , , , , · , , · , , , , , Z ' . . , . , · . , -3000 .." "r" ",..1'.... -3000 g 0 7" 0 Il) ~ ~ :[ ~ Æ II Q) ~ -4500 ,.,,'....< ..·."...H.... -4500 en . . en V V 7 ¡ V :rv 6/100 ¡ rgt 41 Cry 5I1~O .End Cry ~ -6000 _Crv5/100 i ....¡...' -6000 ,> .~~.~..<. n" > ~,..<. ......;"". -7500 ....,~~dl.. -7500 ~ TD/4-1fL ~ -10500 -9000 -7500 -6000 -4500 -3000 -1500 0 «< W Scale = 1(in):1500(ft) E »> · BPX AI( Anticollision Report e NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation MethodMD Interval: 50.00 ft Depth Range: 28,50 to 18442.48 ft Maximum Radiu~íJOOO,OO ft Reference: Error Model: Scan Method: Error Surface: Survey Program for Definitive Well path Date: 4/28/2003 Validated: No Planned From To Survey ft ft 28,50 1000,00 Planned: Plan #4 V1 1000.00 18442.48 Planned: Plan #4 V1 Version: Toolcode Tool Name GYD-GC-SS MWD+IFR+MS Gyrodata gyro single shots MWD + IFR + Multi Station Casing Points PB P Pad P-01 P-01 V3 494.70 500,00 193.59 8,29 185.30 Pass: Major Risk PB P Pad P-02 P-02 V2 540,21 550,00 154,81 9,76 145,04 Pass: Major Risk PB P Pad P-02 P-02A V5 540.21 550,00 154.81 9,76 145.04 Pass: Major Risk PB P Pad P-03A P-03A V1 490.22 500,00 122,32 9.26 113.06 Pass: Major Risk PB P Pad P-03APB 1 P-03APB1 V3 490.22 500,00 122.32 9.26 113.06 Pass: Major Risk PB P Pad P-03APB2 P-03APB2 V3 490,22 500.00 122,32 9.26 113.06 Pass: Major Risk PB P Pad P-03 P-03 V1 490.22 500.00 122.32 9.26 113.06 Pass: Major Risk PB P Pad P-Q4 P-04 V6 490.67 500.00 88.02 8.92 79.10 Pass: Major Risk PB P Pad P-04 P-04L 1 V1 490.67 500.00 88.02 8.92 79.10 Pass: Major Risk PB P Pad P-05 P-05 V1 445.25 450,00 53.51 7.29 46,22 Pass: Major Risk PB P Pad P-05 P-05A V1 445,25 450.00 53.51 7.29 46.22 Pass: Major Risk PB P Pad P-05 P-05PB1 V6 445.25 450.00 53.51 7.29 46.22 Pass: Major Risk PB P Pad P-06A P-06A V1 479.53 450,00 18,54 8.63 9,90 Pass: Major Risk PB P Pad P-06 P-06 V1 491,33 500.00 18.91 9.20 9,70 Pass: Major Risk PB P Pad P-07 P-07 V4 545.72 550,00 17,33 9.76 7.57 Pass: Major Risk PB P Pad P-07 P-07 A V3 545.72 550.00 17.33 10,19 7.14 Pass: Major Risk PB P Pad P-08 P-08 V1 793.98 800,00 31,95 13.17 18.78 Pass: Major Risk PB P Pad P-08 P-08A V1 793.98 800,00 31,95 13,17 18.78 Pass: Major Risk PB P Pad P-08 P-08APB1 V1 793,98 800,00 31,95 13.17 18,78 Pass: Major Risk PB P Pad P-09 P-09 V1 1046.43 1050.00 65,83 18,51 47.31 Pass: Major Risk PB P Pad P-09 P-09L 1 V3 1046.43 1050,00 65.83 18.51 47,31 Pass: Major Risk PB P Pad P-10 P-10 V1 896.06 900,00 116,35 16.48 99.88 Pass: Major Risk PB P Pad P-11 P-11 V1 386,69 400,00 264.57 7.95 256.62 Pass: Major Risk PB P Pad P-12 P-12 V1 391.29 400.00 239.61 7.46 232.16 Pass: Major Risk PB P Pad P-12 P-12A V1 391.29 400.00 239.61 7.46 232.16 Pass: Major Risk PB P Pad P-12 P-12APB1 V2 391.29 400,00 239,61 7.46 232.16 Pass: Major Risk PB P Pad P-12 P-12APB2 V1 391.29 400.00 239.61 7.46 232,16 Pass: Major Risk PB P Pad P-12 P-12B V4 391.29 400,00 239,61 7.46 232.16 Pass: Major Risk PB P Pad P-13 P-13 V1 339,35 350.00 217.70 6.22 211.48 Pass: Major Risk PB P Pad P-14A P-14A V2 Plan: Undefin 392.86 400,00 202,62 8.04 194.58 Pass: Major Risk PB P Pad P-14 P-14 V1 392,86 400.00 202.62 8.04 194.58 Pass: Major Risk PB P Pad P-15 P-15 V3 339.49 350,00 186,78 6.38 180.40 Pass: Major Risk PB P Pad P-15 P-15L 1 V2 339.49 350.00 186.78 6.38 180.40 Pass: Major Risk PB P Pad P-16 P-16 V1 339.55 350,00 181,60 6.32 175.29 Pass: Major Risk PB P Pad P-17 P-17 V3 339.59 350,00 180,69 6,05 174,64 Pass: Major Risk PB P Pad P-18 P-18 V3 292.06 300,00 188.14 6.13 182.01 Pass: Major Risk PB P Pad P-18 P-18L 1 V3 292.06 300.00 188.14 6,18 181,97 Pass: Major Risk PB P Pad P-19 P-19 V1 339.56 350.00 202,17 6.18 195.98 Pass: Major Risk PB P Pad P-20 P-20 V1 386,59 400.00 219.76 7.70 212.06 Pass: Major Risk PB P Pad P-20 P-20A V1 346.40 350.00 218.97 6.89 212.09 Pass: Major Risk PB P Pad P-20 P-20APB 1 V2 346.40 350.00 218,97 6.84 212,13 Pass: Major Risk PB P Pad P-20 P-20B V8 348.41 350.00 219.00 6.88 212.12 Pass: Major Risk · BPX AI( Anticollision Report e PB P Pad P-21A P-21A V1 386.34 400.00 240.86 7.56 233,30 Pass: Major Risk PB P Pad P-21 B P-21 B V3 386,34 400.00 240.86 7.56 233.30 Pass: Major Risk PB P Pad P-21 P-21 V1 386.34 400.00 240.86 7,56 233,30 Pass: Major Risk PB P Pad P-22 P-22 V1 390.97 400,00 291,21 6.29 284.91 Pass: Major Risk PB P Pad P-23 P-23 V1 446,09 450.00 229.26 7.79 221.47 Pass: Major Risk PB P Pad P-24 P-24 V1 1001.02 1000.00 134.99 16.58 118.41 Pass: Major Risk PB P Pad P-24 P-24PB 1 V11 1001,02 1000.00 134.99 16.57 118.41 Pass: Major Risk PB P Pad P-25 P-25 V5 383.67 400.00 545.88 6.42 539.46 Pass: Major Risk PB P Pad P-25 P-25L 1 V7 383.89 400.00 545,89 6.42 539.46 Pass: Major Risk PB P Pad P-26 P-26 V5 338.80 350,00 565.72 5.41 560.30 Pass: Major Risk 277 .. 200 ··..···100 100 200 277 Field: Prudhoe Bay Site: PB P Pad Well: Plan P-27 Wellpath: Plan P-27 27 P-03~~~3APB2) P-05 (P-05J\I)Il) N~(P·N~l) P,I2 (P-12!"J'B2) ~:n·~~A) 6 P-07 (P-07,)\) P-14~B4)lA) 180 Travelling Cylinder Azimuth (TFOtAZI) [deg] vs Centre to Centre Separation [100ft/in] Polygon I 2 3 4 5 6 7 8 . Site: PB P Pad Drilling Target Conf.: 90% Description: Map Northing: 5943309.00 ft Map Easting: 620707.00 ft Latitude: 70015'13.325N Xft 0.00 -351.85 367.70 286.46 569.46 723.17 117.11 224.75 , ~ Target: P-27 Tgt Poly yft 0.00 -618,01 -2488.99 -3878.89 -3939.84 -2467.18 -569.17 -131.95 o o o o o o . Well: Plan P-27 Based on: Planned Program Vertical Depth: 8900,00 ft below Mean Sea Level Local +N/-S: -3725.16 ft Local +E/-W: -10597.39 ft Longitude: 149°01'28.465W Map E ft 620707.00 620366.00 621118.00 621061.00 621345.00 621473,00 620834,00 620934.00 -1000 -2000 -3000 -4-000 -5000 -5000 -lOOO -8000 -9000 o o Map N ft 5943309.00 5942685,00 5940827.00 5939436.00 5939380.00 5940855.00 5942742.00 5943181.00 N p055230 DATE 1/6/2004 CHECK NO, 055230 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT NET 1/6/2004 PRO 1 0504N PERMIT TO DRILL H ~PßU P-'}:? THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ . BP EXPLORATION, (ALASKA) INC. PRUDHOE BAY UNIT PO BOX 196612 ANCHORAGE, NATIONAL CITY BANK Ashland, Ohio 56"389 412 No. P 055230 CONSOLIDATED COMMERCIAL ACCOUNT PAY: AMOUNT TO THE ORDER OF: . 1110 5 5 2 :ì 0 III I: 0 ~ ¡. 20 :ì B Ii 5 I: O. 2 7 B Ii bill . . TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~/J q ~-.27 . PTD# 7 ð '1- a ~ 0 X Development Service Exploration Stratigraphic CHECK WBA T ADD-ONS ~'CLUEn APPLIES (OPTIONS) MULTI Tbe permit is for a new weJJbore segment of LATERAL existing weD . Permit No, API No. . (If API num ber Production. sbould continue to be reported as last two (2) digits a function 'of the original API number, stated are between 60-69) above. PILOT BOLE In accordance with 20 AAC 25.005(1), all (PH) records, data and logs acquired for tbe pilot bole must be clearly differentiated In botb name (name on permit plus PH) and API Dumber (SO - 70/80) from records, data and logs acquired for well (name on permit). SPACING Tbe permit is approved subject -to fuD EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing ex ception. (Companv Name) assumestbe liability of aDY protest to tbe spacing . e:JceptioD tbat may occur. DRY DITCH An dry ditch sample sets submitted to tbe SAMPLE Commission must be in no greater ·than 30' sample iDtervals from below tbe permafrost or from where samples are first caught aDd 10' sample intervals through target zones. . . o o Well bore seg Annular Disposal Program DEV On/Off Shore .on Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UN PBU P-27 PLORATION (ALASKA) INC Initial ClasslType DEV /1-0IL GeoArea Unit - Administration P~rmit.fee ¡¡ttached, , - - - - - - ,Y~s 2 Le¡¡senumberappropri<1t~, , , ' - - - -- - - - - - - .Y~s - - - - - 3 ,U_nlque well.n,a[1l~,anc:llJumb,er , , , , , ' _ , , _ , , , , _ ' , , ' , _ ' _ , _ _ , , ' , .Y~s - - - - - - - - . - - - - - - - - - - - - ~ 4 WeIlJQc<1t~d ina,defilJedppol , , - - - - - Yes - - - - - - - - - 5 WeJUQc<1ted prpper distance, from driJling ulJitb.oulJd,ary, " Yes 6 WeIUQc<1t~d prOper ,distance from otlJer welJs, ' , .Y~s 7 SufficielJt acre¡¡g,e,ay¡¡ilable lndril/ilJg, unjt, , .Yes 8 Jf.deviatec:l, js, weJlbQre plaUlJcJu,dec:l ' , , .Yes - - -- 9 ,O,perator onl}! ¡¡ff:ectec:l party, - - - - - - , , ,Y~s " , 10 ,O,perator lJas,apprpprlate,bonc:l inJorce , , _ , ' _ ' , _ , ' , , ' , , ' .. .. .. _ , .Y_es - - - - . - - - - - - - - - - - - - - - - - 11 Pel"fT)it can be issu.ed witlJQut CO,nservatiOIJ order, , , - - - - 'y,es Appr Date 12 P~rmit c.an be lssu.ed witlJout ¡¡dmilJistratil¡e,apprpvaJ , , .Yes RPC 3/11/2004 13 Can permit be approved before 15-day wait Yes 14 Well JQc<1ted wi.thin area and,strat<1,authorized by InjectiolJ Order # (Put 10# in,c,ol)'1[1l,ents), (For, ,NA 15 AJI welJs,withí.n.1l4,mile,area_of review idelJ!ifiec:l (For servjc.e.w.e[l OIJIYL _ _ ' _ , , , , ' _ , , _ , ,NA - - - - - - - - - - - - - - - - - - - - -- 16 Pre-proc:luçed injector; ,duratiQn,of pre-productiOIJ less th¡¡n. 3. montbs, (Fofservice welt QnJy) , ,NA 17 ACMP, F.indingof Con.si$tencyh,as been issued, for, tbis project NA Engineering 18 ,C,onduçt,or string,prQvided , , .Yes 19 ,S,urfac.ecasilJg,pJotects ¡¡ILknown. USOWs , .Yes 20 ,CMT vol adequate, to çirc,ulate,oncolJd,uctor & SU,rt, csg , ' , , , , , , .Yes .A.de~uate excess. , 21 ,CMT vol. adequate to tie-í.nJQng ,string to,surf çsg, , , N.o, 22 ,CMTwilJ coveraJl klJo.wnproductiye borizon.s, ' , - - - - - , , .Y~s 23 C,asing designs ad,eClua.te for C"T" B ,&, permafr.ost. , , ,Yes - - -- 24 ,Adequate.tan,kage,oJ re,serve pit, - - - -- , , .Yes t>J¡¡b,ors,7 or 9E.5. , - - - - 25 Jf.are-driIL bas, a, 10,4,03 for abandonment be~n <1PPJoved , NA t>Jewwell, ' 26 Adequate,wellboresepar<1tjo,npro,posed, , , , ' _ ' _ _ , , , , _ , , ' , , ,_, _ ,,_Yes - - - - . - - - - - - - - - - - - - -- 27 Jf.diverter required, does it meet reguJatiOlJs, - - - - .Y~s Appr Date 28 ,Dril/ilJg fluid, prQgram sc.hematic,& equip Jist.adequ<1te, , ' , .Yes Max MW,11 ,3,ppg. WGA 3/11/2004 29 BQPEs" do they meet reguJa.tiol'l , , ' .Yes - - - -- 30 ,BQPE,press ra.tilJQ appropriate; ,test to (put psig in,commelJts) , , ,. Yes Test to .4DOO, psi. ,MSf> 28,64 psi. 31 Choke manifold cQmpJies w/API. Rf>-53 (May 84), ' .Y~s 32 WQrk will occ,ur without.operatjon ,sb, utdo.w.n , ' , , ,Yes 33 .Is presence of H2S gas, probable, , ' No P nQt.an H2S pad, 34 Mechanic¡¡LCOlJdition of wells withilJ .A.OR verified (for,s,ervice welJ onJy) NA Geology 35 Permit c.an be issued w!Q hyl;irogen, sulfil;ie meas,ures , No, 136 ,D,ata,preselJted on pote,ntial ove,rpres,sure ,ZOlJe$, NA Appr Date 37 ,Sei$micanalys.is Qf sbaJlow gaszolJes , , ,NA RPC 3/11/2004 38 S~abedcOl'ldjtipo survey ,(if oft-shore) , , NA 39 , CQnta,ct lJamelphone.forwee~ly progress,reports - - - - - NA = Geologic Date: Engineering Date Commissioner: Commissioner ~11'?'f ~Ì0 3/1S/1--