Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-0783 '3 !._ W f. 8 V
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. OperationsPerformed
Pull Tubing ❑
Operations shutdown ❑
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑
Casing 11Change
Approved Program ❑
Suspend ❑
Perforate El Other Stimulate 13Alter
Re-enter Susp Well ❑
Other: WeIlLock IC Packoff 0
Plug for Redrill ❑ Perforate New Pool 11 Repair Well 0
Printed and ElecVonic Fracture Sdmulation Data ❑
Permit
:
to D611 Number204.078
to the best of my knowledge.
4. Well Class Before Work
5.
2. Operator Name: BP Exploration (Alaska),
Inc
Development 0
Exploratory ❑
API Number
50-029-21372-01-00
3. Address: P.O. Box 196612
Anchorage,
Stratigraphic ❑
Service ❑
6.
AK 99519-6612
8.
Well Name and Number:
PBU A -30A
ignation (Lease Number):
ADL 028288 8 047472
and
print tlata per 20AAC25.071): 10
s and submit electronic
P1RUDHOE BAV, PR OHO
OIL
Condition Summary:
r
12710, 13066
Met
measured
13859 feet Plugs
measuretl
rest
feet Junk
8922
measured__ NN
true vertical
7
1_ 271�feet Packer
measured 7�Met
feet
Effective Depth: measured
Packer
true vertical 6 19
true vertical
893 feet
TVD:
Burst Collapse:
Casing: Length:
Size: MD:
Structural1490
32-112
32-112
470
Conductor 80
20'•
31 - 2857
4930 2670
Surface 2850
13-3/8" 31 - 2682
29-3341
6670 4760
Intermediate 3417
9-518" 29-3446
3224-8824
7240 5410
Liner 7490
7•, 3307 - 10797
8430 7500
4-112" 6011 - 13856
6657- 8928
Liner 5845
12170-13080 feet
Perforation Depth: Measured depth:
True vertical depth: 8947-8941 feet
27-8017 27-6661
Tubing (size, grade. measured and true vertical depth) 4-112" 12.6# 13Cr80
7960 6619
4-112" Baker Premier Packer
Packers and SSSV (type, measured and
-�
true vertical depth) No SSSV Installedtum
ressure). Left extra 4' hose filled w/ WeIlLock attached to Test port 0 voitl
12. Stimulation or cement squeeze summary: Pumped3/4 gallon WeIlLock into void Q 650 psi (cesing pressure) Pumped additional Welllwk and cut upinner
- id
for LCM. Pressured up to 2500 psi but leaks off slowly to 800 psi (120 psi over casing p
return as WeIlLock sets up and attempt to increase squeeze pressure. Monitor and maintain Wellhead temp 85-95f until WeIlLock sample Setup
pressure. Will
completely.
Intervals treated (measured): IC Void
Treatment tlescriptions inclutling volumes used antl final pressure: 3 gallons WeIlLock. Final Pressures: IA= 650 psi, OA= 850 psi, IC VOID =700 psi
Representative Daily Average production or Injection Data
13. Tubing Pressure
Gas-Mcf Wafer -Bbl Casing Pressure
Od-Bbl
Prior to well operation: 488
3771
Subsequent to operation: Shut -In
14. Attachments: (Bauved per 20 nec 25 0713.25 071, a 25.2e3)
15, Wall Class after work.
Daily Repoli of Well Operations 0
Exploratory ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Printed and ElecVonic Fracture Sdmulation Data ❑
GSTOR ❑ WIND
117. 1 hereby certify that the foregoing is tme and cored
to the best of my knowledge.
Authorized Title: Interventions 8
Authorized
worm 10-404 Revised 0412017
6960
828 490
700 0
Development 0 Service ❑
Stratigraphic ❑
Oil 0 Gas ❑ WDSPL ❑
WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
Sundry Number or NIA if C.O. Exempt:
NIA
Contact Name: Montgomery, Travis J
Contact Email: Travis.Montgomery@bp.wm
Date:
2 Contact Phone +1 907 564 4127
FEB 1 11019 ^'�R SubmitOriginal Only
RBDMS
Daily Report of Well Operations
PBU A -30A
I AMM
M1 1IVI11 URIC
T/1/0 = SSV//650.700 Temp = SI. Install heater on wellhead (Wellock). Installed heater in
wellhouse. Bled treecap x SSV void to 0 psi. Left man door open.
11/9/2018
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 03:00.
TWO = SSV/670/680. Temp = SI. WHPs (pre Wellock). ALP = 670 psi and is SI @ casing valve.
OA has 1502 flange installed outside of CV. IAP increased 20 psi, OAP decreased 20 psi from
11/9/18. Heater is working properly.
11/11/2018
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 01:30.
T/I/O=SSV/670/680, Temp=Sl. Perform injectivity test on IC test/ PKG voids.
RU test equipment to IC test void and packing ports. Opened SBS on IC test void (680 psi).
Pumped HYD fluid into test port (3500 psi), getting small amount of plastic returns from SBS. Shut in
SBS and pumped approx 1/2 gal of Hyd fluid, pressure slowly dropping off to 1000 psi (15 min). Rig
11/13/2018
off test ort and RU to PKGort. Pressured PKG void to 5000 psi for 30 min, lost 100 psi in 30 min.
Install heater hose into wellhouse on IC void. Bleed tree cap pressure to 0 psi. Leave wellhouse
1/16/2019
dooro en.
Job Scope: WeIlLock Treatment IC Packoff
TIO - SSV/650/650. 1000 psi on test port of IC PO void. Crack bleeder screw and getting dry green
stick returns. Mix and pump WeIlLock into void with bleeded screw open but unable to get returns.
Pumped 3/4 gallon wellLock into void @ 650 psi (casing pressure) Pumped additional wellLock and
cut up innertube for LCM. Pressured up to 2500 psi but leaks off slowly to 800 psi (120 psi over
casing pressure). Left extra 4' hose filled w/ WeIlLock attached to Test port @ void pressure. Will
return as WeIlLock sets up and attempt to increase squeeze pressure. Monitor and maintain
Wellhead temp 65-95f.
1/18/2019
****Job Complete****
T/I/O = SSV/650/650. Temp = SI. Monitor IC void (post Wellock). IC void pressure = 700 psi, temp
= 98*. Sample like warm honey. Increased IC void pressure w/hand pump using hydrolic fluid from
700 psi to 980 psi with 1 stroke of pump.
Pressured up from 740 psi to 1000 psi w/1 pump from hand pump, sample setting up like cold
molasses @ this time.
Pressured up from 700 psi to 1500 psi w/1.25 pumps. Additional 1/3 cup of WL injected sice initial
treatment. Sample setting up thicker than molasses @ this time. Final pressure on the IC void =
1320 psi. Heater in well house, man door open tree cap @ 0 psi.
1/19/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 16:30
TWO = SSV/650/650. Temp = SI. Monitor and maintain Wellhead temp 65°-95°f. IC void = 950 psi.
Temp = 60°, sample still not set up completely. Repositioned heater trunk closer to well head to get
temp higher.
1/20/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 04;30
TWO = SSV/650/650. Temp = SI. WHPs (post wellock). ALP = 670 psi, SI @ casing valve. IC
void = 580 psi. WH Temp = 79°, sample mostly set up. Heater working properly, repostioned heater
trunk towards IC void. WHPs unchanged. Tree cap bled to 0 psi.
1/21/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 09:30
TWO = SSV/650/650. Temp = SI. WHPs (Post Wellock). ALP = 670 psi, SI @ casing valve.. IC
void = 270 psi. Casing temp @ 85* (Did not adjust heater). Sample is set up. The IC void lost 80
psi in 7.5 hours.
1/22/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:30
T/1/0 = SSV/650/650. Temp = SI. WHPs (post wellock). ALP = 760 psi, SI @ casing valve. IC
void = 160 psi taken from upper 5K gauge. Casing temp @ 840 (Did not adjust heater). Sample is
set up. The IC void lost 40 psi in 12.5 hours.
1/23/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30
TWO = SSV/650/650. Temp = SI. Monitor and maintain Wellhead temp 650- 85°f. IC void = 180
psi. Temp = 98°, sample is set up completely. Move heater hose back 1'.
1/24/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 04:00
TWO = SSV/650/650. Temp = SI. WHPs (post Wellock). ALP = 760 psi, SI @ CV. IC void temp =
300. Heater sock blown to far side of wellhouse due to wind, repositioned. IC void = 140 psi. IC
void decreased 10 psi in 11 hrs.
1/25/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 15:00
• •
Carlisle, Samantha J (DOA) 2 O
tt
From: Loepp,Victoria T(DOA)
Sent: Tuesday, February 06, 2018 9:29 AM
To: Carlisle, Samantha J (DOA)
Subject: FW: Please cancel/withdraw 2 sundries
Sam,
Could you please handle the withdrawals outlined below: PBU 15-30B, PTD 210-037,Sundry 318-019 (This one may be
in the pile you are preparing approval letters for right now)
From: Lastufka,Joseph N [mailto:Joseph.Lastufka@bp.com]
Sent: Monday, February 05, 2018 2:52 PM
To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov>
Cc: Montgomery,Travis J <Travis.Montgomery@bp.com>;Worthington,Aras 1<Aras.Worthington@bp.com>
Subject: Please cancel/withdraw 2 sundries
Victoria,
Please cancel Sundry#317-393 for A-30A(PTD#204-078).We will possibly be resubmitting another sundry with a
different work scope.
Please withdraw Sundry for BiSN treatment for 15-30B.This sundry has not been approved and we have submitted a
replacement sundry.
If you have any questions or need clarification, please don't hesitate to let me know.
Thank you, SCS NED
Joe Lastufka
Information and Data Controller
Cell: (907) 227-84961 Office: (907) 564-4091
_� Sa bsurface&Wells
BP Exploration Alaskal900 E. Benson Blvd.IRoom: 788D1Anchorage, AK
1
•
Loepp, Victoria T (DOA)
From: Lastufka,Joseph N <Joseph.Lastufka@bp.com>
Sent: Monday, February 05,2018 2:52 PM
To: Loepp,Victoria T(DOA)
Cc Montgomery,Travis J;Worthington,Aras J
Subject: Please cancel/withdraw 2 sundries
Follow Up Flag: Follow up
fa1cV (�
Flag Status: Flagged
1 \n U`
Victoria,
Please cancel Sundry#317-393 for A-30A(PTD#204-078).We will possibly be resubmitting another sundry with a
different work scope.
Please withdraw Sundry for BiSN treatment for 15-30B.This sundry has not been approved and we have submitted a
replacement sundry.
If you have any questions or need clarification, please don't hesitate to let me know.
Thank you,
Joe Lastufka
Information and Data Controller
Cell: (907) 227-84961 Office: (907) 564-4091
trtt:
Subsurface&Weds
�stfOfR#Bii Mir' jemen;
BP Exploration Alaskal900 E. Benson Blvd.JRoom: 788D1Anchorage, AK
KAMM
1
• •
THE STATE Alaska Oil and Gas
,�--d� i oft\Ll ls Conservation Commission
333 West Seventh Avenue
GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
Main: 907.279.1433
A1"A ;S�� Fax: 907.276.7542
www.aogcc.alaska.gov
Travis Montgomery
Interventions and Integrity Engineer cs_
BP Exploration (Alaska), Inc. SCANNED -�°
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU A-30A
Permit to Drill Number: 204-078
Sundry Number: 317-393
Dear Mr. Montgomery:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Cathy . Foerster
Commissioner
DATED this eday of September, 2017.
RBDMS Uv SEP - 8 2017
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMI N
APPLICATION FOR SUNDRY APPROVA S
20 AAC 25.280
1. Type of Request: Abandon 0 Plug Perforations 0 Fracture Stimulate ❑ Repair Well 0 • Operations shutdown 0
Suspend 0 Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program 0
Plug for Redrill ❑ Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing ❑ Other OA,/Squeeze WC({locj� '
2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 204-078 '
•
3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development B
99519-6612 Stratigraphic 0 Service 0
6. API Number: 50-029-21372-01-00 •
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes 0 No ® . PBU A-30A •
RECEIVED
9. Property Designation(Lease Number): 10. Field/Pools:
028286&047472 • PRUDHOE BAY,PRUDHOE OIL' AUG 1 5g 7
11. PRESENT WELL CONDITION SUMMARY DTS 7
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): 0
a
13859 - 8927 '
8005 6652 8005.12710.13066
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80 20" 32-112 32-112 1490 470
Surface 2650 13-3/8" 31-2682 31-2657 4930 2670
Intermediate 3417 9-5/8" 29-3446 29-3341 6870 4760
Liner 7490 7" 3307-10797 3224-8824 7240 5410
Liner 5845 4-1/2" 8011-13856 6656-8928 8430 7500
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
12170-13080 8947-8941 4-1/2"12.6# 13Cr80 27-8020
Packers and SSSV Type: 4-1/2"BAKER PREMIER PACKER Packers and SSSV MD(ft)and TVD(ft): 7962/6620
No SSSV Installed No SSSV Installed
12.Attachments: Proposal Summary 0 Wellbore Schematic ® 13.Well Class after proposed work:
Detailed Operations Program 0 BOP Sketch ❑ Exploratory 0 Stratigraphic 0 Development ® • Service 0
14.Estimated Date for Commencing Operations: September 15,2017 15. Well Status after proposed work:
Oil ® • WINJ 0 WDSPL 0 Suspended 0
16.Verbal Approval: Date: GAS ❑ WAG 0 GSTOR 0 SPLUG 0
Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0
17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Montgomery,Travis J
be deviated from without prior written approval.
Contact Email: Travis.Montgomery@bp.com
Authorized Name: Montgomery,Travis J Contact Phone: +1 907 564 4127
Authorized Title: Interventions&Inteegrriityj Engineern
Authorized Signature: h , �Y//,r, /,�,��1t� Date: 8//S/17
Lv�L/v/� 4'_�1/COMMISSION USE ONLY/ e
Conditions of approval:Notify Commission so that a representative may witness Sundry Number.
3 «- 3 3
Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0
Other:
Post Initial Injection MIT Req'd? Yes 0 No IN;
'/
Spacing Exception Required? Yes 0 NoSubsequent Form Required: / 0 /-
APPROVED BYTHE
Approved by: agy
COMMISSIONER COMMISSION Date:Q — 7r//
VTL '1 /► / 17'
ORIGINAL RBDMS /24
�� S x _ 821317
yr fg.7
Submit Form and
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
•
• •
bp
Well: A-30
A-30 OA Cement&WeIlLock Squeeze
Well Interventions Engineer: Travis Montgomery (918) 281-9663
Pad Engineer: Brian Glasheen (907) 545-1144
History
A-30A is a gas-lifted Zone 4 producer. It has known scale downhole and downstream of the choke. The
well has exhibited extensive tree glowth over time. In the second half of 2013, the well broke OA
MOASP and showed rapid OA pressurization three times while starting up or shutting down and was
declared not operable by the WIC. The IC primary seal was leaking in 2012 and 2013. In 2013, the
secondary seal was leaking when well was shut-in and cold but holding when well was online and hot.
The IC packoff was repaired with Seal-Tite in 2014 and 2016. Well had sustained OA casing pressure
above Normal Operating Limit (NOL) on 7/12/17.-The OA pressurization is not manageable. Seal-Tite
is no longer considered a long-term solution. A warm PPPOT-IC Passed on 7/20/17.
Current Status
The well is classified as "Not Operable" by BP due to the OA pressurization. The well is therefore
currently shut-in until the leak is fixed.
Objective
Squeeze the OA with cement and WeIlLock to mitigate OA pressurization.
Procedural steps
Fullbore- 1st OA cement down squeeze
1. OA injectivity test.
2. OA down squeeze:
• 13-3/8" x 9-5/8" annulus fry ' to surface = 156 bbls
• Pump 180 bbls of Class G Cement
Cement Design- 1st OA down squeeze
BHST-40 deg F. SBHP--2199 psi
BHCT-50 deg F
Cement: Class G cement batch mixed.
Density: 15.8 ppg
Thickening time: Minimum 4 hours
(2 hr pump time + 2 hr contingency)
API Fluid Loss: 80-400 cc (40-200 cc/30 min)
Free Water: 0
Compressive Strength: Minimum of 2000 psi
Requested Volume: 180 bbls pumpable
Fullbore-2nd OA cement down squeeze (if needed)
1. Pump a second cement job to refill OA to surface (if needed).
' Special Projects—OA WellLoc Queeze •
1. ND OA Gate Valves, NU OA Integrals.
2. Bleed Annuli (bleed IA as low as possible).
3. Prep OA, WeIlLock OA top job squeeze to 2500 psi per RP "WellLock Treatment for Cemented OAs."
Note: The following are the well-specific equipment ratings that support squeezing to a higher
pressure than usual (2500 psi).
a. Burst of 13-3/8" 72# L-80: 5,380 psi, 80% is 4304 psi
b. Collapse of 9-5/8" 47# L-80: 4757 psi, 80% is 3805 psi
c. Casing packoffs tested to 3500 psi on 7/20/17.
4. After 1 week cure, ND OA Integrals, NU OA gate valves.
2
•
• •
•
Loepp, Victoria T (DOA)
From: Montgomery,Travis J <Travis.Montgomery@bp.com>
Sent: Friday,August 25, 2017 10:10 AM
To: Loepp,Victoria T (DOA)
Subject: RE: PBU A-30A(PTD 204-078,Sundry 317-393) OA Cement Squeeze/Well Lock
Follow Up Flag: Follow up
Flag Status: Flagged
Victoria,
Recent diagnostics that tested potential sources of the pressurization include a passing CMIT-TxIA on 8/9/17 and a
passing PPPOT-IC on 7/20/17.The surface casing shoe is not cemented.
Please let me know if you have any further questions.
Thanks,
Travis
From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov]
Sent: Friday,August 25,2017 9:02 AM
To: Montgomery,Travis J<Travis.Montgomery@bp.com>
Subject:PBU A-30A(PTD 204-078,Sundry 317-393)OA Cement Squeeze/Well Lock
Travis,
Have any diagnostics been performed to determine the source of the pressurization? Is the surface casing shoe
currently cemented?
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil&Gas Conservation Commission
333 W.7th Ave
Anchorage,AK 99501
Work: (907)793-1247
V ictoria.Loepp(Q�alaska.Qov
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged
information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended
recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to
you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp@alaska.gov
1
TREE= 41/8" CAN FL A 3 0 A AFETY NOTES: ***4-112-CHROME
WELLHEAD= kbEVOY TBG'**W ELL ANGLE>70*a 10975'.
ACTUATOR-=- BAKER C
OKB= 80.88'
RE=EFEl/= 80.07 '
) /
BF.8_EV= 50.77
KOP= 2200' /
Max Angle= 96*@ 13435 / I ' 2201' H 41/2"HES X NP,D=3.813"
Datum MD= 10858' /
Datum TVD= 8800'SS
13-3/8"CSG,72#,L-80,113=12.347" H 2677'
E] 3307' -i 9-5/8"X 7"BKR ZXP LNR TOP PKR
GAS LFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT DATE
Minimum ID a 3.725"18005' 4 3353 3265 32 KBG-2 OW BK P 0 07/07/04
4-1/2" HES XN NIPPLE 3 4217 3914 43 KBG-2 DOME BK ' 16 04/05/13
2 6086 5262 45 KBG-2 SO BK ' 28 04/05/13
1 7744 6468 43 KBG-2 OW BK ' 0 08/22/06
MLLOUT VVAI)OW 3446'-3462'
7939' H 4-1/2"HES X NP,D=3.813"
7960' -.17"X 41/2" BKR S-3 R(R
WI X
1111* '� 7984' H4-1/2"HES X NP,D=3.813"
1.1.1; 8006' H4-1/2"HES XN NP,D=3.725"
;4*4 8006' —I4-1/2"PXN PLUG(08/09/17)
11111
,111
1 8016' 4-1/2"TBG,12.6#,13-CR,
11111 0 .0152 bpf,D=3.958"
9-5/8"CSG,474,L-80,D=8.681" —j 10752' X10 ' ` 801 T 41/2"WLEG,D=3.956"
�'1'1, $ g 8011' _
1.4.• I7"X 5"BKR ZXP LNR TOP
PKR W/TIEBACK SLV
7"LHR,26#,L-80,.0383 bpf,D=6.276" -I 11240' '1.1.1.1;1x1.1.1• \ i 803$' 5"X 4-1/2"XO,D=3.950"
1414161414141414/
PERFORATION St AARP
REF LOG: IL
AT TOP PEI: 91* 74 12170'
Note:Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz SHOT SOZ
2-7/8" 4 12170-12500 0 07/03/04
2-7/8" 4 12550-12640 0 07/03/04
2-7/8" 4 12900-13080 C 07/03/04
I 12710' -41/2"HES CEP(07/16/10)
13066' -141/2"HES EZSU,MILLED 01/02/05
7"LHR,26#,L-80,.0383 bpf,0=6.276" 10797'
PBTD -I 13768' I 111
4111
4-1/2"LNR,12.6#,L-80,.0152 bpi,D=3.958" H 13868'
/ �4���1
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
06129/85 ORIGINAL COMPLETION 01/12/16 GTVVYJM\SET PX PLUG(01/09/16) WE.L: A-30A
07/02/03 DAV/KK ATTEIAPT RIG SDTRK(A-30L1) 01/25/16 DJUATLH TREE C/O(01/16/16) PERMIT lb:'2040780
07/08/04 KAK RIG SIDETRACK(A-30A) 01/25/16 DJS/TLH RU.PX PLUG(01/19/16) AR No: 50-029-21372-01
02/03/14 JTMJMD SET PXN PLUG(02/01/14) 02/11/16 TK/JM) REMOVE)SAFETY NOTE SE;35,T11N,R13E,2099'FSL&1013'FB_
03/13/14 TACVJMD ADD®SAFETY NOTE 08/14/17 FVJMD SET PXN PLUG(08/09/17)
06/27/14 DU.FYJMD PULE)PXN PLUG(06/24114) 08/15/17 JMJJMD ADDED OKB,REF&BF-E]IT MO I/WDOW BP Exploration(Alaska)
08/27/14 PJC PERFORATION CORRECTION I
• •
Wallace, Chris D (DOA)
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent: Tuesday,August 8, 2017 5:52 PM
To: AK, GWO SUPT Well Integrity;AK, OPS GC1 Field O&M TL;AK, OPS GC1 Wellpad Lead;
AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad AB;Ak, Ops West
Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Boman,
Wade; Glasheen, Brian P;Von Tish, Douglas B; Regg,James B (DOA)
Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions
Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A;
Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis
J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Worthington,
Aras J;Wallace, Chris D (DOA)
Subject: NOT OPERABLE: Producer A-30A (PTD#2040780) Outer Annulus Pressurization Not
Manageable `—
All,
Producer A-30A(PTD#2040780)was made under evaluation on 7/16/17 for having sustained outer annulus casing
pressure above NOL. After further diagnostics and assessment of the well history it has been determined that the OA
pressurization is not manageable. The well is now classified as Not Operable and must be shut in as soon as
operationally possible. The well will be secured with a downhole plug and the engineering team will evaluate repair
options.
Please respond with any questions,
Joshua Stephens
Well Integrity Engineer
Office: 907-659-8110
Cell: 907-341-9068
SCANNED AUG 1 0 2017
WO
From: A', e PT Well Integrity
Sent: Sunday, July 16, i :42 PM
To: AK, OPS GC1 Field O&M TL; , • GC1 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS
Well Pad AB; Ak, Ops West Area TL; AK, RE - . ..st Wells Opt Engr; AK, RES GPB West Wells Opt Engr; Boman, Wade;
Glasheen, Brian P; Von Tish, Douglas B; 'Regg, James B •: 'im.regg@alaska.gov)' (jim.regg@alaska.gov)
Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; , _ i 0 Completions Well Integrity; AK, GWO SUPT
Well Integrity; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Dog• • Daniel, Ryan; Dempsey, David G;
Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Be.e, •' onnor, Katherine;
Sternicki, Oliver R; Worthington, Aras J; 'chris.wallace@alaska.gov' (chris.wallace@alaska.gov)
Subject: UNDER EVALUATION: Producer A-30A (PTD #2040780) Sustained OA Casing Pressure Above Ni
• •
Wallace, Chris D (DOA)
From: AK, GWO SUPT Well Integrity <AKDCWelllntegrityCoordinator@bp.com>
Sent: Sunday,July 16, 2017 4:42 PM
To: AK, OPS GC1 Field O&M TL;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead;AK,
OPS Prod Controllers;AK, OPS Well Pad AB;Ak, Ops West Area TL;AK, RES GPB East
Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Boman,Wade;Glasheen, Brian P;
Von Tish, Douglas B; Regg,James B (DOA)
Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions
Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS
App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;
Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor,
Katherine;Sternicki, Oliver R;Worthington,Aras J;Wallace, Chris D (DOA)
Subject: UNDER EVALUATION: Producer A-30A(PTD#2040780) Sustained OA Casing Pressure
Above NOL
Attachments: Producer A-30A(PTD#2040780)TIO Plot 2017-07-16.docx;A-30A.pdf
All,
Producer A-30A(PTD#2040780)was reported to have sustained Outer Annulus(OA)casing pressure above Normal
Operating Limit(NOL)on 07/12/17. Reported pressures were TBG/IA/OA=425/1400/1150 psi.The well has previously
exhibited IA x OA communication via the wellhead when shut in;this was repaired by a Seal-Tite treatment in December
2016.
The well is reclassified as Under Evaluation,to determine whether the rate of OA repressurization has increased,and
specifically whether that rate is manageable by bleeds when the well is shut in.
Plan Forward:
1. Downhole Diagnostics:Warm OA Repressurization Test—In Progress
2. Wellhead: Positive Pressure Packoff Test—Inner Casing(PPPOT-IC)
3. DHD:Thermally cycle well and monitor OA build-up rate with crystal gauge
4. Well Integrity Engineer:Additional diagnostics as required
Please reply if in conflict with proposed plan.
Thanks,
AUG 41 8 2Q1
S`ANNE®
Adrienne McVey
Well Integrity Superintendent—GWO Alaska
(Alternate:Jack Lau)
0:(907)659-5102
C:(907)943-0296
H:2376
1
• •
Wallace, Chris D (DOA)
From: AK, GWO SUPT Well Integrity <AKDCWelllntegrityCoordinator@bp.com>
Sent: Sunday, October 30, 2016 2:28 PM
To: AK, OPS GC3&PCC OSM;AK, OPS GC3 Facility OIL;AK, OPS GC1 Field O&M IL;AK, OPS
GC1 Wellpad Lead;Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr;
AK, RES GPB East Wells Opt Engr;AK, OPS Prod Controllers;AK, OPS EOC Specialists;AK,
OPS Well Pad AB; Glasheen, Brian P; Regg,James B (DOA)
Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions
Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;Wallace,
Chris D (DOA); Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey;
Obrigewitch, Beau; Pettus,Whitney; Sternicki, Oliver R;Tempel,Troy;Worthington,Aras
J
Subject: UNDER EVALUATION: Producer A-30A(PTD#2040780) Evaluate Inner Casing Seal-Tite
Treatment
All,
Producer A-30A(PTD#2040780)was classified Not Operable on 10/24/16,after plastic packing the inner casing(IC)test
void failed to mitigate rapid IA x OA communication that occurs when the well is shut in. On 10/29/16,the IC void
underwent a Seal-Tite treatment,and subsequently passed a Positive Pressure Packoff Test—Inner Casing to 3500 psi.
The next step is to bring the well online, monitor,and then thermally cycle it,to determine if the Seal-Tite treatment
mitigated the IA x OA communication.
The well is reclassified as Under Evaluation. Please bring the well online for diagnostics as soon as operationally feasible.
Work Completed/Plan Forward:
1. Downhole Diagnostics: Cold and Warm OA Repressurization Tests—Completed 10/13/16
2. Wellhead: Plastic Pack Inner Casing void and perform warm PPPOT-IC—Passed 10/17/16
3. DHD:Shut in well and monitor OA pressure—Completed 10/19/16—OA pressure increased from 200 to 1150
psi overnight
4. Wellhead: Perform Seal-Tite Treatment—Completed 10/29/16
5. Wellhead: PPPOT-IC to 3500 psi—Passed 10/30/16
6. Operations: POP Under Evaluation
7. DHD:Thermally cycle well, monitor for OA re-pressurization
Please reply if in conflict with proposed plan.
Thanks,
Adrienne McVey SCANNEDFr Ea 2 i 277
Well Integrity Superintendent—GWO Alaska
(Alternate:Jack Lau)
0:(907)659-5102
C:(907)943-0296
H:2376
Email: AKDCWellIntegrityCoordinator@BP.com
From: AK, GWO Projects rity
Sent: Monday, October 24, 2016 9:03
• •
Wallace, Chris D (DOA)
From: AK, GWO Projects Well Integrity <AKDCProjectsWelllntegrityEngineer@bp.com>
Sent: Monday, October 24, 2016 9:03 AM
To: AK, GWO SUPT Well Integrity;AK, OPS GC3 Facility OTL;AK, OPS GC3 Operators;AK,
OPS GC3 Field OTL;AK, OPS GC3 Wellpad Lead;AK, OPS GC3&PCC OSM; Cismoski,
Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt
Engr;AK, OPS Prod Controllers;AK, OPS EOC Specialists;AK, OPS Well Pad AB;
Glasheen, Brian P; Regg,James B (DOA)
Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions
Well Integrity;AK, OPS FF Well Ops Comp Rep;Wallace, Chris D (DOA); Hibbert,
Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey;Obrigewitch, Beau;
Pettus,Whitney; Sternicki, Oliver R;Tempel,Troy;Worthington,Aras J;AK, GWO Well
Integrity Well Information
Subject: NOT OPERABLE: Producer A-30A(PTD#2040780) Sustained OA Casing Pressure Above
MOASP
All,
Producer A-30A(PTD#2040780) has been Under Evaluation since 10/01/16 to diagnose rapid IA x OA communication
while shut in.On 10/17/16 the IC void was plastic packed and the well shut in again for diagnostics,while shut in for 18
hours the OA built 1000 psi to 1150 psi.The well was subsequently brought online to minimize communication.
In July 2014,a Seal-Tite treatment of the inner casing seals mitigated the IAxOA communication. Post-treatment,the
well was thermally cycled (shut in, monitored,then brought back online),with no signs of OA repressurization.The
recent rapid repressurization when the well was shut in indicates that the Seal-Tite treatment has degraded.
The well is now reclassified as Not Operable until repaired.
Plan Forward:
1. APE consider second Seal-Tite treatment.
Please reply if in conflict with proposed plan.
Thanks,
Js%gy p, SCANNED MiV' , 9 2r,;.-
BP Well Integrity Specialist
Office:907-659-5766
Harmony-2377
11tkrn aie. .losh Stc1)11.1is
GW OG'oba'W eDs
rcanrze troy
1
• •
Wallace, Chris D (DOA)
From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>
Sent: Saturday, October 01, 2016 8:25 AM
To: AK, OPS GC3 Facility OTL; AK, OPS GC3 Operators;AK, OPS GC3 Field OTL; AK, OPS GC3
Wellpad Lead;AK, OPS GC3&PCC OSM; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB
West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS Prod Controllers; AK,
OPS EOC Specialists; AK, OPS Well Pad AB; Glasheen, Brian P; Regg, James B (DOA)
Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO Completions
Well Integrity;AK, GWO SUPT Well Integrity; AK, OPS FF Well Ops Comp Rep; Wallace,
Chris D (DOA); Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey;
Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras
Subject: UNDER EVALUATION: Producer A-30A (PTD#2040780) Sustained OA Casing Pressure
Above MOASP
Attachments: Producer A-30A (PTD #2040780) TIO Plot 2016-10-01.docx
All, iCANNED FEB 1 3 Z1J'
Producer A-30A (PTD#2040780) was reported to have sustained OA casing pressure above MOASP on 09/27/16,
approximately one day after the well was shut in. Operations personnel promptly bled the OA pressure from 1180 psi to
100 psi.The well was subsequently brought back online, and a follow-up monitor on 09/29/16 showed the OA pressure
stable. Wellhead pressures were TBG/IA/OA= 570/1870/160 psi.
Later on 09/29/16,the well was shut in again. A post-shut in monitor on 09/30/16 showed the OA nearly equalized with
the IA. Wellhead pressures were TBG/IA/OA= 2000/1990/1960 psi. Downhole Diagnostics bled the OA to 0 psi, and the
IA to 440 psi.
A-30A has a history of IAxOA communication. When the well is online,the communication is manageable by bleeds.
However, the communication has often been rapid when the well is shut in with high IA pressure. Diagnostics indicate
that the leak path is via the wellhead. Specifically,the primary Inner Casing seal leaks, and the secondary IC seal holds
when the well is online and warm, but leaks when the well is shut in.
In July 2014, a Seal-Tite treatment of the inner casing seals mitigated the IAxOA communication. Post-treatment,the
well was thermally cycled (shut in, monitored,then brought back online),with no signs of OA repressurization.The
recent rapid repressurization when the well was shut in indicates that the Seal-Tite treatment has degraded.
The well is reclassified as Under Evaluation for further diagnostics and repair.
Plan Forward:
1. Downhole Diagnostics: Bleed OA and IA pressures—Completed 09/30/2016
2. Well Integrity Engineer: Cold and Warm OA Repressurization Tests
3. WIE: Additional diagnostics as required (consider Seal-Tite treatment)
A copy of the TIO plot is attached.
Please reply if in conflict with proposed plan.
Thanks,
•
• •
I- c o
I I il
0
0
cfl
N
111
il ......
Q1
O
lD
N
O
\
I
01
O
1
L tr)
N
\
to
N
I -11111111111P 00O
lD
p \
Q.
1011 . 01
O co
0
I '.D
.41111
�
i
N
\�
I
1 r1
I in
I \
1 O
lD
O
lO.-I
10.3:;
p 1 `CO
N-
v \
O ` o
E
I
T°
00
li 0
_
•
0-1%0
Regg, James B (DOA)
aoy
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Sunday, January 10, 2016 8:42 PM
To: Regg, James B (DOA) I Crl(
Cc: AK, D&C Well Integrity Coordinator 1
Subject: A-30 Master Valve by Tubing Head Adapter flange leak
Attachments: A-30 Leak Calculation .xls
Jim,
Around 10 pm on the evening of Friday January 8th, a gas leak was reported by the night operator to be coming from the
master valve by tubing head adapter on Producer A-30A(PTD#2040780). Both downhole diagnostics and the valve
crew were nearby and responded immediately. The gas leak ceased once the valve crew tightened the first nut on the
leaking flange. Once all of the flange nuts were tightened, a load and kill was performed on the well so that the flange
could be torqued up. A downhole tubing tail plug has been set for secure for upcoming tree change out. Both a passing
PPPOT-T and MIT-T were obtained yesterday on January 09, 2016 confirming the well is secure.
Producer A-30A (PTD#2040780)was shut in at the time of the reported leak.The well is 95%water cut with minimal
formation gas. I've included the last three well tests and the gas release calculations have been attached for
reference. The leak was active for less than 24 hours and was equated to having a needle valve open a quarter of the
way. The final estimate for gas volume release was 19.1 kg/hr.The incident investigation is currently ongoing.
7 17MScc/c ct
Date Hrsi BFPD BOPD I IOR BWPD WC'.r ' TGLR FGLR ' Form GOR i GIL Rate GL FTP Temp
J_
�___. _ ... __ I __ � — - __ _ �Gas Press
121372015 12 5,294 346 309 5,948 95 759 236 1,484 4,288 3,292 1,914 445 1-7-9-
11/21,2015 6 5,652 292 256 5,360 95 833 253 1,428 4,896 3,281 1,918 445 179
10/3112015 6 6,530 363 322 6,167 94 755 251 1,640 4514 3,233 1,922 448 178
Please let me know if you have any questions, comments, or concerns.
Thank you,
Whitney Pettus
saviOD JUL 2 7 2016
(Alternate: Ke in Parks)
BP Alaska-Well Integrity Coordinator
,.$010"281.
WIC Office: 907.659.5102
WIC Email: AKDCWellIntegrityCoordinator@BP.com
1
• •
N
X
G
O
CV 2
lull Nl ol,d a wWniU xlr.4 Y Aoc, N to
7T,
�O_______. . / , , I :7 ''. 1 I I li ..*-- m
— . V Q
•
//// g L c0 O m
G i 7 N L
!!J
( I I O I
-rh
0 ' Ille►YAr I I I,f a
i-4., rr�,r�,rr � Y 1 m
o
C" . a
o
a,
o
0 3
U
o
a g a
W c c 4
ri•
+ r IIS c E ^d 4
� � ,C) .0
! jo
aI
a
N
m y
to C_
N
m
9
a o
m L
o i._
m
U
`° co
E o
o
v W r
m uv
ow ' _
- ° m
m
V a i a ami
LL W Y Om t L 9
Q' ~ m Zm m
O o m H CO m a
W O ca d d CN C y
O a m 2 Y 7 m
Ui AO O r0 O O C (A
W .., ` 4 o Q a�c L a
ix C m 17— O 2 co II 2 O 0 0 E
Q 3 m m m co y
a Q . I > ? N m N
N 9 .4 O O O N N N Imd m O �;I
I co ¢ D a 2
O - a m a N .o Y u)U U L
2 7 d u u.Ta C5 flx -a as In rn
I— co co 2
0 (A d N O.-40 n0 0 O CD N O O tO N O�O N T N W j
m e O O O O O co O I� •O M(7 -- r W
_J y t 0U y
Lu O g 5 1?J y '' d o n II N U w
CO 0 a
fn O. o m� c.x I–Cc.a -ov N aQ c.m> 2 U 3 o- Z 0 C c
y O
W m ami d d . ( 7:3
m
Ca o m E
a_ O m w E co 10 cc-,-_- d m N d o
2 LL a o m N m N a'r0 a-rnO U m C
oio 0 3 n a m is E n v `�=o N 3o LL d E m " a - w Z am' 0
u_ v E m m E 92 0 6 u_ m— F o a o°2 o 0 aci :3 N z. o _
O Ta C) t N a) n2 to ami m m j'E p m 0'c a,w Q a o .. am, x o> x E
U w°� :7,-,3 ;,1i, w w a"i m e al `,4t2 n X�°m a w aa) i.'E m u CO
O 7M>xmO OS U(oO7Om~ W inf OU tYQ C7 Of v7 O m w
IL co
LLF U v
Z-,
WO
J a' d
0 a CC
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Saturday, June 06, 2015 7:02 PM
To: AK, OPS GC3 Facility OTL; AK, OPS GC3 Operators; AK, OPS GC3 Field OTL; AK, OPS GC3
Wellpad Lead;AK, OPS GC3&PCC OSM; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well
Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, RES GPB
West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK,
OPS Well Pad AB; Glasheen, Brian P; Wallace, Chris D (DOA)
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer;AK, D&C
Projects Well Integrity Engineer; Sternicki, Oliver R; AK, OPS FF Well Ops Comp Rep;
Regg, James B (DOA)
Subject: OPERABLE Producer A-30A (PTD #2040780) Passing Outer Annulus Repressurization
Test
Attachments: image001.png; Producer A-30A (PTD #2040780) TIO Plot 06-06-15.docx
All,
Producer A-30A (PTD#2040780) passed an outer annulus repressurization test on 06/06/2015 with a buildup rate of 152
psi per day. The passing OART confirms that the outer annulus pressure can be managed by bleeds. The well is
reclassified as Operable.
A copy of the TIO plot is included for reference.
Thank you,
Sadat ) JUN 3 02015
Kevin Parks
(Alternote Whitnev Pettus
BP Alaska -Well Integrity Coordinator
G itt
Global Wells
Organization
Office: 907.659.5102
WIC Email:AKDCWeIlIntegrityCoordinator@bp.com
From: AK, D&C Well Integrity Coordinator
Sent: Monday, June 01, 2015 3:37 PM
To: AK, OPS GC3 Facility OTL; AK, OPS GC3 Operators; AK, OPS GC3 Field OTL; AK, OPS GC3 Wellpad Lead; AK, OPS
GC3&PCC OSM; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline
Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers;
AK, OPS Well Pad AB; Glasheen, Brian P; 'chris.wallace@alaska.gov'
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer;
Sternicki, Oliver R; AK, OPS FF Well Ops Comp Rep; Regg, James B (DOA) (jim.regg@alaska.gov)
Subject: UNDER EVALUATION: Producer A-30A - Sustained Outer Annulus Casing Pressure Above MOASP
All,
Producer A-30A (PTD#2040780) was reported to have sustained outer annulus casing pressure above MOASP on
06/01/2015. The pressures were tubing/inner annulus/outer annulus of 200/1900/1500 psi. The well is reclassified as
Under Evaluation and is placed on a 28 day clock to facilitate evaluation.
Plan forward:
1. DHD: Perform outer annulus repressurization test
2. Wellhead: PPPOT-IC
Copies of the wellbore schematic and TIO plot are included for reference.
Please call with any questions.
Thank you,
Kevin Parks
(Alternate. Whitney Pettus
BP Alaska-Well Integrity Coordinator
G�,it) GlobalWells
V Organization
Office: 907.659.5102
WIC Email:AKDCWelllntegrityCoordinator@bp.com
From: AK, D&C Well Integrity Coordinator
Sent: Tuesday, January 07, 2014 12:07 PM
To: AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Operators; AK, OPS GC3 Wellpad Lead; AK, OPS GC3&PCC OSM;
Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead;
AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead;
AK, OPS Well Pad AB; Wermager, Chad R; 'chris.wallace@alaska.gov'
Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer;
'jim.regg@alaska.gov'
Subject: UNDER EVALUATION: Producer A-30A - Sustained Outer Annulus Casing Pressure Above MOASP
All,
Producer A-30A (PTD#2040780) was reported to have sustained outer annulus casing pressure above MOASP on
01/06/2014. The pressures were tubing/inner annulus/outer annulus of 1950/1990/1440 psi. The well is reclassified as
Under Evaluation and is placed on a 28 day clock to facilitate evaluation.
Plan forward:
1. DHD: Perform outer annulus repressurization test
2. DHD: Perform MIT-OA
3. Wellhead: PPPOT-IC
Copies of the wellbore schematic and TIO plot are included for reference.
Please call with any questions.
Thank you,
Jack Disbrow
(Alternate. Laurie Climer)
2
BP Alaska-Well Integrity Coordinator
G'
/�J Global Wells
�/�/ Organization
Office: 907.659.5102
WIC Email:AKDCWellIntearityCoordinator@bp.com
3
Producer A-30A(PTD#2040780)TIO Plot 06-06-15
KC
m
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com>
Sent: Monday, June 01, 2015 3:37 PM
To: AK, OPS GC3 Facility OTL; AK, OPS GC3 Operators; AK, OPS GC3 Field OTL; AK, OPS GC3
Wellpad Lead; AK, OPS GC3&PCC OSM; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well
Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, RES GPB
West Wells Opt Engr;AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK,
OPS Well Pad AB; Glasheen, Brian P; Wallace, Chris D (DOA)
Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer; AK, D&C
Projects Well Integrity Engineer; Sternicki, Oliver R; AK, OPS FF Well Ops Comp Rep;
Regg, James B (DOA)
Subject: UNDER EVALUATION: Producer A-30A - Sustained Outer Annulus Casing Pressure
Above MOASP
Attachments: image001.png; Producer A-30A (PTD # 2040780)Wellbore Schematic.pdf; Producer
A-30A (PTD #2040780) TIO plot.docx
All,
Producer A-30A(PTD#2040780)was reported to have sustained outer annulus casing pressure above MOASP on
06/01/2015. The pressures were tubing/inner annulus/outer annulus of 200/1900/1500 psi. The well is reclassified as
Under Evaluation and is placed on a 28 day clock to facilitate evaluation.
Plan forward:
1. DHD: Perform outer annulus repressurization test
2. Wellhead: PPPOT-IC
Copies of the wellbore schematic and TIO plot are included for reference.
Please call with any questions.
Thank you, SCANNED JUN 0 9 2015
Kevin Parks
(Alternate. Whitney Petr
BP Alaska-Well Integrity Coordinator
GVVGlobal Wells
Organization
Office: 907.659.5102
WIC Email:AKDCWeIllntegrityCoordinator@bp.com
From: AK D&C W� eeggrity Coordinator
Sent: Tuesday, January 0 , 2G14.12:07 PM
To: AK, OPS GC3 Facility & Field OTL; PS GC3 Operators; AK, OPS GC3 Wellpad Lead; AK, OPS GC3&PCC OSM;
Cismoski, Doug A; Daniel, Ryan; AK, D&C WellSevic Operations Team Lead; AK, D&C Wireline Operations Team Lead;
AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wes ngr; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead;
AK, OPS Well Pad AB; Wermager, Chad R; 'chris.wallace@alaska.go
Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordina • • ,K, D&C Projects Well Integrity Engineer;
1
•
•
•
Producer A-30A(PTD#2040780)TIO plot
OM
31.
-41.11111
2.
Mal
1 KO
m0.n 0sv ro nsis+s 03711, 0.11 WWI m,a+s a»xi 00{15 01•93.1, OMIS 06411 am.,s MOM
•
•
•
•
e e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~ Q Y- - 07. B Well History File Identifier
Organizing (done)
o Two-sided ""111111111111111
o Rescan Needed II 111111111 II 111111
RESCAN
~oJor Items:
o Greyscale Items:
DIGITAL DATA
~iskettes, No. ,
o Other, NolType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
o Other::
BY:
~
Date 95/ I Din b
151
V11P
Project Proofing
1/11111111111111111
Date'?;/J 0/0 b
:-3 x 30 = q 0
Date: C(j / I () / 0 ~
151
mf
BY:
C_ Maria .:>
BY:
c; Maria")
+ I d- = TOTAL PAGES I 0 :J-
(Count does not include cover sheet) IA Å {J
151 'r V~ r
1111111111111111111
Scanning Preparation
Production Scanning
Stage 1 Page Count from Scanned File: J 0'3 (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
BY: ~ Date:<Ö/10JO(o
NO
Stage 1
If NO in stage 1, page(s) discrepancies were found:
YES
151 V\1 f
NO
BY:
Maria
Date:
151
1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
III II 111/11I11/1111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
11/11111/111 1111111
10/6/2005 Well History File Cover Page. doc
•
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
May 18, 2012
A U G 1 7 2012
Mr. Jim Regg
Alaska Oil and Gas Conservation Commission 0 7g'
333 West 7 Avenue ; o4
Anchorage, Alaska 99501 0 Pt
Subject: Corrosion Inhibitor Treatments of GPB A -Pad
Dear Mr. Regg,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad
A that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
A -Pad
Date: 04/15/2012
Corrosion
Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API 4 Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft na pal
A -01A 2012420 50029201080100 1.3 NA 1.3 NA 11.10 7/21/2009
A -02 1710310 50029201090000 1.9 NA 1.9 NA 13.60 7/22/2009
A -03 1710380 50029201130000 0.5 NA 0.5 NA 5.10 7/21/2009
A -04 1720060 50029201150000 0.0 NA NA NA NA NA
A -05A 2061280 50029201160100 0.0 NA _ NA NA NA NA
A -06 1720180 50029201180000 0.8 NA 0.8 NA 6.80 7/21/2009
A -07 1730410 50029201310000 0.8 NA 0.8 NA 5.10 8/12/2009
A -08 1740040 50029201320000 No conductor NA NA NA NA NA
A -09A 2001740 50029205520100 0.5 NA 0.5 NA 3.40 7/21/2009
A -10 1810300 50029205680000 14.0 NA 14.0 NA 103.70 7/22/2009
A -11 1810380 50029205750000 5.0 NA 5.0 NA 17.00 7/22/2009
A -12A 2071300 50029205150200 0.5 NA 0.5 NA 3.40 7/22/2009
A -13 1811590 50029206720000 0.3 NA 0.3 NA 2.55 4/15/2012
A -14 1810770 50029206050000 3.3 NA 3.3 NA 17.00 7/19/2009
A -15 1810780 50029206060000 0.5 NA 0.5 NA 3.40 7/19/2009
A -16A 1960980 50029205210100 0.3 NA 0.3 NA 1.70 7/19/2009
A -17A 2061250 50029205200100 0.3 NA 0.3 NA 2.60 7/19/2009
A -18 1921070 50029206300100 SC leak NA NA NA NA NA
A -19 1811270 50029206480000 0.8 NA 0.8 NA 3.40 7/19/2009
A -20 1820130 50029207090000 0.8 NA 0.8 NA 5.10 7/20/2009
A -21 1820140 50029207100000 2.0 NA 2.0 NA 16.15 7/20/2009
A -22 1820180 50029207120000 Sealed conductor NA NA NA N/A NA
A -23 1820240 50029207160000 0.3 NA 0.3 NA 3.40 7/20/2009
A -24 1820700 50029207430000 29.0 _ 5.8 0.1 11/27/2009 1.70 3/18/2010
A -25A 2011480 50029207640100 0.3 _ NA 0.3 NA 1.70 8/13/2009
A -26L1 1971060 50029207946000 0.3 NA 0.3 NA 1.70 7/21/2009
A -27A 1982350 50029208090100 7.5 _ NA _ 7.5 NA 71.40 7/20/2009
A -28 1821500 50029208250000 2.5 NA 2.5 NA 20.40 7/20/2009
A -29 1821670 50029208410000 9.0 NA 9.0 NA 62.90 7/21/2009
.--, A -30A 2040780 50029213720100 0.3 NA 0.3 NA 1.70 7/19/2009
A -31A 1990560 50029213830100 0.8 NA 0.8 NA 4.30 7/19/2009
A -32A 1990580 50029213950100 2.0 NA 2.0 NA 17.00 4/11/2012
A -33 1851830 50029214100000 0.8 NA 0.8 NA 3.40 8/12/2009
A -34A 1851050 50029213390100 4.4 NA 4.4 NA 28.90 7/22/2009
A -35 1850510 50029213130000 1.3 NA 1.3 NA 10.20 7/22/2009
A -37 1930070 50029223310000 0.0 NA NA NA N/A No treat
A -38 1930320 500292234700 0.1 NA 0.1 NA 0.85 4/15/2012
A -39 1930280 50029223440000 0.5 NA 0.5 NA 3.40 7/21/2009
A -40 1930140 50029223370000 0.5 NA 0.5 NA 3.40 7/22/2009
A -41 1941580 50029225300000 SC leak _ NA NA NA NA NA
A -42A 2061300 50029225420100 0.6 NA 0.6 NA 5.10 7/20/2009
A -43 1960860 50029226770000 0.3 NA 0.3 NA 1.70 8/12/2009
A -44 2090410 50029234120000 1.5 NA 1.5 NA 8.50 6/24/2009
UNDER EVALUATION: Producer OA (PTD #2040780) Confirmed Susta *d OA Pressure ... Page 1 of 1
Regg, James B (DOA)
From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com] 4 3�lc?
Sent: Saturday, December 11, 2010 3:46 PM
To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS FS3 OSM; AK,
OPS FS3 Facility OTL; AK, OPS FS3 DS Ops Lead; AK, OPS Well Pad AB; AK, D &C Wireline Operations
Team Lead; AK, D &C Well Services Operations Team Lead; Cismoski, Doug A; Engel, Harry R; AK, RES
GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Derrick, Laurie R
Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Quy, Tiffany
Subject: UNDER EVALUATION: Producer A -30A (PTD #2040780) Confirmed Sustained OA Pressure Above
MOASP
Attachments: Producer A -30A (PTD #2040780) TIO Plot.doc; Producer A -30A (PTD #2040780) Wellbore Schematic.pdf
All,
Producer A -30A (PTD # 2040780) has confirmed sust OA casi pressure above MOASP. The
wellhead pressures were tubing /IA/OA equal to 400/2000/1300 on 12/09/2010. The well has been
reclassified as Under Evaluation. The well may remain onl'� ine while work is conducted to attempt to
restore integrity.
The plan forward: a
1. Wellhead: PPPOT -IC, re- energize packoff seals LIE i I `' Mut
2. DHD: Outer Annulus Represurization Test
A TIO plot and wellbore schematic have been included for reference.
<<Producer A -30A (PTD #2040780) TIO Plot.doc>> <<Producer A -30A (PTD #2040780) Wellbore l
Schematic.pdf>>
Please call if you have questions or concerns.
Thank you,
Gerald Murphy (alt. Torin Roschinger)
Well Integrity Coordinator
Office (907) 659 -5102
Cell (907) 752 -0755
Pager (907) 659 -5100 Ext. 1154
12/13/2010
PBU A -30A
PTD #2040780
12/11/2010
TIO Pressures Plot
Well_ A -30
4,000
iii 0
—0 Tbg
—11— IA
2,000 .+ --- OA
OOA
—— OOOA
On
1.000 i
•
09111110 09/2'5110 10109110 1 011 110 11106 ;'10 11;'20110 104110
TREE = 4" CIW TVY NOTES: WARNING: RADIO
WELLHEAD = McEVOY SMITTER IN WEATHER MONITORING
ACTUATOR = AXELSON A _3 0 A SHACK MUST BE TURNED OFF BEFORE ANY
KB. ELEV = 80.88' WELL WORK INVOLVING EXPLOSIVES CAN
BF, ELEV = 52.92' BEGIN. CONTACT PAD OPERATOP,***4-1/2"
KOP = 2200' CHROME TBG`*
Max Angle = 96 @ 13435'
Datum MD = 10872'
Datum TV = 8800' SS X NIP, ID = 3.813
13-3/8" CSG, 72#, L-80, ID = 12.347" 267T 330 -j 9-5/8" X 7" BKR ZXP LNR TOP PKR
GAS LIFT MANDRELS
ST MD TVD DEVI TYPE I VLV LATCH PORT DATE
Minimum ID = 3.725" @ 8005' 4 3353 3263 32 KBG-21 DMY BK 0 07/0704
4-1/2" HES XN NIPPLE L 3 4217 3912 43 KBG-21 DOME BK 16 10/26/06
2 6086 5255 45 KBG-21 SO BK 24 10/26/06
1 7744 6460 43 KBG-21 DMY BK 1 0 08/22/06
MILLOUT WINDOW 3451'- 3462
7939' - 44 -1 /2" - HES NIP, ID =
T 7 - X
-4 -- 7 - 96 — W -- 14 T - 1/2' - BKR S-
1 -- 4 -- 7 - 9 - 8 - 4 - -- 1 - 44 - 1 - /2 -- HES -x- NIP, -
800 5' 4-1/2' HES XN NIP, ID = 3.725"
4-1/2" TBG, 12.6#, 13-C R,
1.0152 bpf, ID = 3.958"
4-1/2" WLEG, ID = 3.958"
9-5/8" CSG, 47#, L-80, ID 8.681 10752'
7" X 5" BKR ZXP LNR TOP
PKR W/ TIEBACK SLV
T' LNR, 26#, L-80_0383 bpf, ID = 6.276" 11240' 8035' -- 45 7 X - 4-1/ - 2 -- X - O, - ID - = - 3 - 9 - 50 -- 'I
PERFORATION SUMMARY
REF LOG:
A NGLE AT TOP PERF: 91 @ 12170'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 12170 - 12500 0 07/03/04
2-7/8" 4 12550 - 12640 C 07/03/04 –F - 1 2 - 7j — W -- 4
j-r - - 1 - /2 -- HE S - C1B P - (0 - 7/ - 16/1 - 0 - )]
2-7/8" 4 12900 - 13080 C 07/03/04
I I I I 1 13066' -A4-1/2" HES EZSU, MILLED 01/02/0
17" LNR, 26#, L-80,.0383 bpf, 10797'
FP - B - T - Dj 13768'
13856'
14-1/2" LNR, 12.6#, L-80_0152 bpf, ID 3.958" 14
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
06/29/85 ORIGINAL COMPLETION 10/26/06 DTR/PAG GLV C/O WELL: A-30A
07/02/03 DAV/KK ATTEMPT RIG SDTRK (A-301-11) 07/28/10 HJW/PJC SET ClSP(07/16/10) PERMIT No: 2040780
07/08/04 KAK RIG SIDETRACK (A-30A) API No: 50-029-21372-01
07/15/04, GJB/KAK, GLV C/O SEC 35,TllN,R13E,2099'NSL&1014'WEL
01/02/05 KEY/TLP MILL HES EZSU a- 13066'
02/06/05 JDW/TLH PERFS OPEN POST MILL EZSU BP Exploration (Alaska)
08/22/06 JCrVVPAG GLV C/O
• •
MICROFILMED
03/01/2008
DO NOT PLACE
X'"~'
v.>
ANY NEW MATERIAL
UNDER THIS PAGE
F: ~LaserFiche\CvrPgs_Inserts~Microfilm_Marker. doc
Well o # 011 escrlPtion ate o or
H-13 11676950 GAS ENTRY SURVEY 06/20/07 1
C-41 11801077 LDL 06/19/07 1
A-30A 11661159 MEM PROD PROFILE 06/23/07 1
W-21 A 11661140 MEM PROD PROFILE 04/21/07 1
E-21 B 11661157 MEM PROD PROFILE 06/19/07 1
M-23 11626107 PRODUCTION PROFILE 06/23/07 1
01-21 11824330 PRODUCTION PROFILE 06/22/07 1
J-25A 11767130 MEM PROD PROFILE 06/18/07 1
Z-08A 11630483 GLS/PROD LOG 06/22/07 1
M-34 11824330 PRODUCTION PROFILE 06/22/07 1
02-30B 11594512 LDL 06/23/07 1
Z-29 11686758 PRODUCTION PROFILE 06/15/07 1
S-38 11801078 LDL 06/20/07 1
H-37A 11594506 PPROF/IPROF (REVISED) 06/05/07 1
N-15 11637129 PROD PROFILE (REVISED) 06/13107 1
Z-13A 11649962 MEM PROD PROF (REVISED) 04/21/07 1
P2-15A 11594511 SCMT 06/15/07 1
12-05 11676951 USIT (CEMENT) 06/24/07 1
12-05 11676951 US IT (CORROSION) 06/24/07 1
B-15 11626097 USIT 06/14/07 1
G-24A 11628750 SCMT 02/05107 1
Sç~lumbepgBr
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
J b
06/29/07
RECEIVED
NO. 4324
JUL 0 3 ZOOl
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
!ìlæiæ Oil & Gas Cons. CommIsskm
Anchorage
Field: Prudhoe Bay
L D
D
BL
CI
CD
.
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
[)c!--/ - Df1f
sCANNED JUL 0 5 2007
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
05/15/07
NO. 4024
~?Jo4 -O--:t1)
Company: State of Alaska
Alaska Oil & Gas Cons Comm
AUn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
.
Well Job# loa DescriDtion Date Bl Color CD
l3-22 11638627 PRODUCTION PROFilE 04/14/07 1
l3-30 11637115 PRODUCTION PROFilE 03/19/07 ,
l4-10 11660529 MEM PROD PROFilE 04/04/07 1
l3-12 11686732 PRODUCTION PROFilE 04/08/07 1
02-29C NIA EMIT & CALIPER IMAGE 04/17/07 1
DS 02-36 11637141 MULTI-FINGER CAlIPE 03/14/07 1
F-16A NIA SCMT 02/12/07 1
X-21A 11660531 MEM CBl 04/07/07 1
F-08A 11676934 SCMT 03/20/07 1
A-30A 11628762 MEM CBl 03/13/07 1
03-36A 11637326 US IT (CORROSION) 04/12/07 1
03-36A 11637326 USIT (CEMENT) 04/12/07 1
DS 17-05 11594492 USIT 04/24/07 1
DS 03-01 11630462 USIT 03/11/07 1
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. SCANNED MAY 1 7 2007
Anchorage. Alaska 99508
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 4 0
Anchorage, AK 99503-2 38
ATTN: Beth
----
~'1,J\y .II. «' Z IJ 1\ 1
Received by:
\~
SCANNED SEP 14 20D5
Scblum~erger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage. AK 99503-2838
ATTN: Beth
¿}ó'¡- Ö-i ~ <;! lL/ (/) Õ
NO. 3941
Company:
R.. ..... r-r -q -
\~ ~ -- '"" r.:~~;~
:)
~L¡-' 1 ~
08/28/06
,Gut;)
~()jf & Gas Gens. Cçrr~
.Ancnorage
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
W
D
Field: Prudhoe Bay
C
ell ob # oq escrlption ate B o or D
C-11A 11225983 LDL 07/02/06 1
B-25 11217247 LDL 05/11/06 1
F-06A 11258688 PROD PROFILE WIDEFT 03/20/06 1
G-18A 11209612 MEM INJECTION PROFILE 07/19/06 1
P-24 11216206 MEM INJECTION PROFILE 07/06/06 1
B-28 11221590 LDL 07/04/06 1
B-01 11211508 PROD LOG W/DEFT 06/23/06 1
W-39A 11216197 MEM PROD PROFILE OS/29/06 1
Z-02A 11212856 INJECTION PROFILE 05/02/06 1
G-03A 11211493 LDL OS/24/06 1
C-26A 11225979 LDL 06/07106 1
F-26B N/A MEM PROD & INJECTION 06/06/06 1
F-26B N/A MEM BORAX LOG 06/06/06 1
W-39A 11216197 MEM BORAX LOG OS/29/06 1
F-04A 11221602 SCMT 08/18/06 1
Y-08A 11221604 SCMT 08/20/06 1
C-06B 11212883 USIT 08/15/06 1
X-27 11217274 USIT 08/26/06 1
K-07D 10942217 MEMORY SCMT 06/15/05 1
Y-10A 11209611 MEM INJECTION PROFILE 07/18/06 1
F-12 11225984 LDL 07/02/06 1
K-07D 11058256 SBHP SURVEY 11/28/05 1
X-04 10919925 PROD PROFILE W/DEFT 12/15/04 1
A-30A 11054295 CH EDIT OF PDC LOG W/GR 04/06/05 1
17-04B 40010183 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 03/09/04 1 1
Z-30A 40010092 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 01/27104 1 1
17-04B PB1 40010183 OH EDIT OF MWD/LWD 03/08/04 2 1
J
L D
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
L
CI
.
.
Alaska Data & Consulting Services
2525 Gambell Street. Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
RECEIVED
Scblum~ergBl'
., <'
(~, d
,~." ! k¡\,,~ì' fj
,-,101.''\;-'';, ~¡:;:-
AUG 2 3 2006
NO. 3914
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503·2838
A TTN: Beth
;I: ¡'foro I
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
~ C1! &: Gas Cons. Commìssicn
And1crnge
8d!- O~
Field: Prudhoe Bay
#
D
Well Job Log escription Date BL Color CD
6-15 11ZZ1600 I-DI- 08/02106 1
F·22 11194169 LDL 02/17/06 1
P-14 11212851 LDL 04/28/06 1
F·24· N/A PRODUCTION LOG 03/29/06 1
E-10A" 11047361 SENSA/MEMORY LDL 10/19/05 1
H·30· 11223103 LDL 03/19/06 1
A·37 11225946 PROD PROFILE W/DEFT 03/20/06 1
B-12A 11211386 PROD PROFILE W/DEFT & GHOST 03/31/06 1
G-06A 11258691 LDL 04/06/06 1
G·24 11258689 LDL 03/21/06 1
H-30 11217258 USIT 06/09/06 1
A-30A 40010566 OH EDIT OF MWD/LWD 06/26/04 2 1
A-30A PB1 40010566 OH EDIT OF MWD/LWD 06/21/06 2 1
A-30A PB2 40010566 OH EDIT OF MWD/LWD 06/25/06 2 1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street, Suije 400
Anchorage, AK 99503-2838
ATTN: Beth
08/15/06
.
.
RECEiVED
'';;;C'Aí\lM!::fJ' t\,~ iC
,,¡/'Y iT' ,t....,·· ,,··~VV (..! C)
C) C':
Scblum~erger
AUG 2 :3 2006
NO. 3914
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
.;~ Oil & Gas Cons. Commìssicn
And10rage
~ 'f-Io~D
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Go(./-01-~
Field: Prudhoe Bay
L
C
CD
Well Job# Log Description Date B olor
6-15 112z1600 LDI- 011/02/06 1
F-22 11194169 LDL 02117/06 1
P-14 11212851 LDL 04/28/06 1
F-24 . N/A PRODUCTION LOG 03/29/06 1
E-10A' 11047361 SENSA/MEMORY LDL 10/19/05 1
H-30' 11223103 LDL 03/19/06 1
A-37 11225946 PROD PROFILE W/DEFT 03/20/06 1
B-12A 11211386 PROD PROFILE W/DEFT & GHOST 03/31/06 1
G-06A 11258691 LDL 04/06/06 1
G·24 11258689 LDL 03/21/06 1
H-30 11217258 US IT 06/09/06 1
A-30A 40010566 OH EDIT OF MWD/LWD 06/26/04 2 1
A·30A PB1 40010566 OH EDIT OF MWD/LWD 06/21/06 2 1
A-30A PB2 40010566 OH EDIT OF MWD/LWD 06/25/06 2 1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting ServIces
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
08/15/06
.
.
RECEIVED
SC~IIn~lrger
AUG 2 3 2006
I\I8Ska Oil & Gas eons. Commission
Anchorage
NO. 3914
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
~/4o'S9
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
do4-Of '8
Field: Prudhoe Bay
WII
J b#
L D
D
B
C
C
e 0 og I escrlption ate L olor D
B-15 11221600 LDL 08/u:.:/u6 1
F-ZZ 11194169 1-01- 02/17/06 1
P-14 11212851 LDL 04/28/06 1
F-24 . N/A PRODUCTION LOG 03/29/06 1
E-10A' 11047361 SENSA/MEMORY LDL 10/19/05 1
H-30' 11223103 LDL 03/19/06 1
A-37 . 11225946 PROD PROFILE W/DEFT 03/20/06 1
B-12A 11211386 PROD PROFILE W/DEFT & GHOST 03/31/06 1
G-06A ' 11258691 LDL 04/06/06 1
G-24 11258689 LDL 03/21/06 1
H-30 11217258 US IT 06/09/06 1
A-30A 40010566 OH EDIT OF MWD/LWD 06/26/04 2 1
A-30A PB1 40010566 OH EDIT OF MWD/LWD 06/21/06 2 1
A-30A PB2 40010566 OH EDIT OF MWD/LWD 06/25/06 2 1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
08/15/06
.
.
PBU A-30A
.
.
Andy,
No open hole logging data was submitted for PBU A-30A API 50-029-21372-01.
Please send over bluelines, reproduceables, and digital logging data for this well.
TNX
Howard
1 of 1
8/7/20062:19 PM
7~
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2006
Permit to Drill 2040780
Well Name/No. PRUDHOE BAY UNIT A-30A
Operator BP EXPLORATION (ALASKA) INC
MD
13859 / TVD
/
Completion Status
Completion Date 7/7/2004 ~
8927
1-01L
Current Status 1-01L
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD DIR / GR / PWD, MWD DIR / GR / RES
Well Log Information:
51tA ~ ;J~ ~ UÐL.f
AP(No. 50-029-21372-01-00
UIC N
(data taken from Logs Portion of Master Well Data Maint
Log/ Electr
Data Digital Dataset Log Log Run Interval OH/
Type Med/Frmt Number Name Scale Media No Start Stop CH Received
y6 D Asc Directional Survey 3399 13859 8/31/2004
Rpt Directional Survey 3399 13859 8/31/2004
ø' D Asc Directional Survey 3399 12139 8/31/2004
:6 Directional Survey 3399 12139 8/31/2004
D Asc Directional Survey 3399 12937 8/31/2004
Rpt Directional Survey 3399 12937 8/31/2004
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
ADDITIONAL INFORMATION
Well Cored? Y @)
Chips Received? Y / N
Daily History Received?
J2N
t;)N
Formation Tops
Analysis
Received?
. ¥ J N
Comments:
~
~õ!c~
/
~ .\)~+(
~
Y>,l-'r~~" ~
~~
Compliance Reviewed By:
~
Date:
.
Comments
PB 1
PB 1
PB2
PB2
.
~I ~~~
_A_ STATE OF ALASKA
ALA5WCJIL AND GAS CONSERVATION CO.SSION
WELL COMPLETION OR RECOMPLETION REPòftr AND LOG
1a. Well Status: !HI Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended D WAG
20AAC 25.105 20AAC 25.110
One Other
5. Date Comp., Susp., or Aband.
7/7/2004
6. Date Spudded
5/30/2004
7. Date T.D. Reached
6/26/2004
8. KB Elevation (ft):
80.07'
21. Logs Run:
MWD DIR I GR I PWD, MWD DIR I GR I RES
CASING, LINER AND CEMENTING RECORD
SernNG DePTH Me SernNG DEPTH TVD HOLE
lOP BoTTOM 'lOP BotTOM SIZE
Surface 110' Surface 110' 36"
Surface 2677' Surface 2653' 17-1/2"
Surface 3446' Surface 3341' 12-1/4"
3307' 10797' 3224' 8824' 8-1/2"
8006' 13856' 6653' 8928' 6-1/8"
o GINJ D WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3181' SNL, 1014' WEL, SEC. 35, T11N, R13E, UM
Top of Productive Horizon:
2815' SNL, 1467' EWL, SEC. 01, T10N, R13E, UM
Total Depth:
4145' SNL, 3981' EWL, SEC. 01, T10N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 654398 ,y- 5947265 Zone- _ ASP4
TPI: x- 656983 y- 5942404 Zone- ASP4
Total Depth: x- 659524 y- 5941126 Zone- ASP4
---------
18. Directional Survey !HI Yes 0 No
No. of Completions
------~
22.
CASING
SIZE
20" x 30·
13-3/8·
9-5/8"
7"
WT. PER FT.
Insulated
72#
47#
26#
12.6#
GRADE
Conductor
L-80
L-80
L-80
L-80
4-1/2"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
2-7/8" Gun Diameter, 4 spf
MD TVD MD TVD
12170' -12500' 8947' - 8932'
12550' - 12640' 8931' - 8934'
12900' - 13080' 8938' - 8941 '
26.
Date First Production:
January 4, 2005
Date of Test Hours Tested PRODUCTION FOR
1/13/2005 4 TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED .........
Press. 300 1,840 24-HoUR RATE"'"
27.
Oll-BsL
521
Form 10-407 Revised 12/2003
9. Plug Back Depth (MD+ TVD)
13066 + 8941
10. Total Depth (MD+ rvD)
13859 + 8927
11. Depth where SSSV set
(Nipple) 2201' MD
19. Water depth, if offshore
NI A MSL
24.
SIZE
4-1/2", 12.6#, 13Cr
ReviHd: 01/17105, Pili on ProcIucIIon, Mill CIBP. New PBTD
1b. Well Class:
!HI Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
204-078
13. API Number
50- 029-21372-01-00
14. Well Name and Number:
PBU A-30A
15. Field / Pool(s):
Prudhoe Bay Field I Prudhoe Bay
Pool
Ft
~?l:Pr"werty Designation:
Ft ", !;'1'~~~l;l~Ð472
f ,- '~,i' {~~ "'; "'\,
20. .Th¡ckne~k~ermafrost
J900' (Approx.)
!..sO, r!tfl~'j,'ilft.~j
CEMENTING RECORD
8 cu yds Concrete
3746 cu ft Permafrost 'E' & PF
2065 cu ft Class 'G', 230 cu ft 'G'
820 cu ft Class 'G', 185 cu ft 'G', 124 cult 'G'
84 cu ft Class 'G', 1538 cu ft Class 'G'
AMOUNT
PUllED
TUBING RECORD
DEPTH SET (MD)
8017'
PACKER SET (MD)
7960'
25. ACID,FRACTURE,CEMEtff SaUEEZE,ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
8115' - 8117' Remedial Cmt for 7" Casing; 124 cu ft Class 'G'
(Also listed under 7" Casing Cement)
Freeze Protect with 151 bbls of Diesel
GAs-McF
244
WATER-Bsl
1,182
WATER-Bsl
7,092
2200'
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Gas Lift
Oll-BsL
87
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
r····
None ¡ .~ ,'j"
¡-~/7~
l~.~
v....._.~..._<__:::;j
GAs-McF
1 ,466
CHOKE SIZE I GAS-OIL RATIO
94.36° 2,811
Oil GRAVITY-API (CORR)
27.4
RBDMS 8Ft JAN 2 4 2005
CONTINUED ON REVERSE SIDE
I /;...
\,J'
G
28. GEOLOGIC MAR.
NAME MD TVD
Sag River 1 0798' 8825'
Shublik A 10824' 8846'
Shublik B 1 0869' 8878'
Shublik C 10892' 8893'
Sadlerochit 10954' 8923'
29. . FORMATION TESTS
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
None
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble 4Li- 0,,~ Title Technical Assistant Date bl "l7 ..O.e::;
PBU A-30A 204-078 Prepared By NameINumber: Terrie Hubb/e, 564-4628
Well Number Drilling Engineer: Dave Wesley, 564-5153
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 18: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate 'None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
Submit Original Only
Well:
Field:
API:
Permit:
.
.
OS/27/04
05/30/04
07/07/04
Nabors 7ES
A-30A
Prudhoe Bay Unit
50-029-21372-01-00
204-078
Accept:
Spud:
Release:
Rig:
10/03/04
DRIFT TBG WI 3.25" CENT & SAMPLE BAILER TO 10968' SLM, STOP DUE TO DEVIATION. WELL LEFT
SHUT IN, SSV DUMPED, PAD-OP NOTIFIED.
POST RIG WORK
01/01/05
MIRU. MU BOT 2-7/8" PDM W/3.625" THREE BLADED JUNK MILL. OPEN WELL AND BLEED DOWN TO
SYSTEM AND RIH WHILE DISPLACING 60/40 FROM COIL AND LOADING HOLE. TAG CIBP AT 12143' AND
MILL THROUGH. CHASE CIBP TO 13066'. CTM. LOST JAR ACTION AND COULD NOT MAKE ANY MORE
PROGRESS WITHOUT GETTING STUCK. POOH. FREEZE PROTECT TUBING TO 2500 ' AND FLOWLINE
WITH DIESEL. NOTE: CIBP DEBRIS FROM MILLING OPERATIONS STILL IN WELL.
"
TREE = 4" CrN
WELLHEAD = McEVOY
ACTUA TOR = AXELSON
o,«_~~>~~..__~~,~~~~~« ~~
KB. ELEV = 80.88'
BF. ELEV = 5i:92'
"~~-~-~ ,--~~-"
KOP = 2200'
Max Angle = 96 @ 13435'
oatumMÖ~ -- 10872'
< .m« ~ _>____
Datum TVD = 8800' SS
.
113-3/8" CSG, 72#, L-80, 10 = 12.347" H 2677'
Minimum ID = 3.725" @ 8005"
4-1/2" HES XN NIPPLE
I 9-5/8" CSG, 47#, L-80, 10 = 8.681" I-! 10752' ~
PERFORA TION SUMMARY
REF LOG:
ANGLEATTOPÆRF: 91 @ 12170'
Note: Refer to R-oduction DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 12170 - 12500 C 07/03/04
2-7/8" 4 12550 - 12640 C 07/03/04
2-7/8" 4 12900 - 13080 C 07/03/04
I 7" LNR, 26#, L-80, .0383 bpf, 10 = 6.276" I-! 11240' ,
A-30A
..
8
~
L
I
I
~ l
8
~
4-1/2"LNR,12.6#,L-80,.0152bPf,ID=3.958" I-! 13856' I
DATE
06/29/85
07/02/03
07/08/04
07/15/04
01/02/05
REV BY COMMENTS
ORIGINAL COM PLETION
DAV/KK ATTEMPT RIG SDTRK(A-30L1)
KAK RIG SIDETRACK (A-30A)
GJB/KAK GLV C/O
KEY ITLP MILL HES EZSU @ 13066'
DATE
REV BY
COMMENTS
. SAFETY NOTES: WARNING: RADIO
TRANSMITTER IN WEATHER MONITORING
SHACK MUST BE TURNED OFF BEFORE ANY
WELL WORK INVOLVING EXPLOSIVES CAN
BEGIN. CONTACT PAD OPERATOR.***4-1I2"
CHROME TBG***
2201' I-! 4-1/2" HES X NIP, ID = 3.813" I
~
3307' I-! 9-5/8" X 7" BKR ZXP LNR TOP PKR I
ST MD
4 3353
3 4217
2 6086
1 7744
GAS LIFT MANDRELS
TVD OEV TYÆ VLV LATCI- PORT
3263 32 KBG-2 DMY BK 0
3912 43 KBG-2 DOME BK 16
5255 45 KBG-2 DOME BK 16
6460 43 KBG-2 SO BK 22
DATE
07/0704
07/15/04
07/15/04
07/15/04
8
7939'
7960' I-! 7" X 4-1/2" BKR S-3 PKR ,
7984' I-! 4-1/2" HES X NIP, 10 = 3.813" I
8005' 1-!4-1/2" HES XN NIP, 10 = 3.725" ,
8016' '14-1/2" TBG, 12.6#, 13-CR, I
.0152 bpf, 10 = 3.958"
~ 8017' I-! 4-1/2" WLEG, 10 = 3.958'"
8011' '17" X 5" BKR ZXP LNR TOP I
PKR WITIEBACK SLV
~ 8035' H 5" X 4-1/2" XO, 10 = 3.950" I
~-j 10797' '17" LNR. 26#, L-80, I
.0383 bpf, 10 = 6.276"
.
..
~
13066' '14-1/2" HES EZSU I
MILLED 01/02/05
~
I 13768' H PBTD I
PRUDHOE BA Y UNIT
WELL: A-30A
PERMIT No: 2040780
API No: 50-029-21372-01
SEC 35, T11N, R13E, 2099' NSL & 1014' WEL
BP Exploration (Alaska)
4
. STATEOFALASKA .-
ALASKA, AND GAS CONSERVATION COM~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
'-
1a. Well Status: ISI Oil D Gas D Plugged D Abandoned D Suspended D WAG
20AAC 25.105 20AAC 25.110
No. of Co~pletions One Other
5. Date Comp., Susp., or Aband.
7/7/2004
6. Date Spudded
5/30/2004
21. Logs Run:
MWD DIR / GR / PWD, MWD DIR / GR / RES
CASING, liNER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE
Top BOTTOM Top BOTTOM SIZE
Surface 110' Surface 110' 36"
Surface 2677' Surface 2653' 17-1/2"
Surface 3446' Surface 3341' 12-1/4"
3307' 10797' 3224' 8824' 8-1/2"
8006' 13856' 6653' 8928' 6-1/8"
D GINJ D WINJ D WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3181' SNL, 1014' WEL, SEC. 35, T11N, R13E, UM
Top of Productive Horizon:
2815' SNL, 1467' EWL, SEC. 01, T10N, R13E, UM
Total Depth:
4145' SNL, 3981' EWL, SEC. 01, T10N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 654398 y- 5947265 Zone- ASP4
TPI: x- 656983 y- 5942404 Zone- ASP4
Total Depth: x- 659524 y- 5941126 Zone- ASP4
-'--
-_._~
18. Directional Survey
!HI Yes
DNo
22.
CASING
SIZE
20" x 30"
13-3/8"
9-5/8"
WT. PER FT.
Insulated
72#
47#
26#
12.6#
GRADE
Conductor
L-80
L-80
L-80
L-80
7"
4-1/2"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
2-7/8" Gun Diameter, 4spf
MD TVD
12170' - 12500' 8947' - 8932'
12550' - 12640' 8931' - 8934'
12900' - 13080' 8938' - 8941'
MD
20. &~~
I.'
. '; tJV;11)
df&:r,f{f¡ 01t /i; ~ .14
~,. CoInw.i-..,,A.MOUNT
CEMENTINtõ~. ···"'~Ut.lED
8 cu yds Concrete
3746 cu ft Permafrost 'E' & PF
2065 cu ft Class 'G', 230 cu ft 'G'
820 cu ft Class 'G'~J8t; cu ft 'G', 124 GU It 'G'
84 cu ft Class ' t~/lt;~~',~~"
TUBING RECORQ 'l::D
DEPTH SETiN.ør~,' (I' . PACKER SET (MD)
,,1< . 0 I'¡."
4-1/2" 12.6# 13Cr /"qe¡)t'*'1>'1,~.. /·';,1Â7960'
" ~ ~M ~:~ Gunl\ (.(), '1'.
25. ACID, FRACTURE, CEMENT ~~~C. ~
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
8115' - 8117' Remedial Cmt for 7" Casing; 124 cu ft Class 'G'
(Also listed under 7" Casing Cement)
7. Date T.D. Reached
6/26/2004
8. KB Elevation (ft):
80.07'
9. Plug Back Depth (MD+ TVD)
12154 + 8947
10. Total Depth (MD+TVD)
13859 + 8927
11. Depth where SSSV set
(Nipple) 2201' MD
19. Water depth, if offshore
N/A MSL
24.
SIZE
TVD
1 b. Well Class:
!HI Development D Exploratory
D Stratigraphic D Service
12. Permit to Drill Number
204-078
13. API Number
50- 029-21372-01-00
14. Well Name and Number:
PBU A-30A
15. Field I Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
ADL 047472
17. Land Use Permit:
2200' Freeze Protect with 151 bbls of Diesel
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
NIA
26.
Date First Production:
Not on Production Yet
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED --11...
Press. 24-HoUR RATE"""
Oll-BBl
Oll-BBl
GAs-McF
WATER-BBl
CHOKE SIZE I GAS-Oil RATIO
Oil GRAVITY-API (CORR)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit cor~,:çhj:)s;jtnone, state "none".
COf'J;fLt; H.,Vi ~
None
. 7~~¿t¡
t ~¿o i
~-< ,.-'. ..~.,~,~
Form 10-407 Revised 12/2003
GAs-McF
W A TER-BBl
RBDMS Bfl
"ue 1 1 ,no~
----
&(~
CONTINUED ON REVERSE SIDE
-. e
28. GEOLOGIC MARKERS
,
NAME MD
Sag River 10798'
Shublik A 10824'
Shublik B 10869'
Shublik C 1 0892'
Sadlerochit 10954'
29.
e
FORMATION TESTS
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
8825'
None
8846'
8878'
8893'
8923'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ---JQ~ ~ Title Technical Assistant Date OA -(J5 -0 l{
PBU A-30A 204-078 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Dave Wesley, 564-5153
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
Legal Name A-30
Common Name: A-30
5/30/2004 FIT
6/9/2004 FIT
,942 (psi) 11.15 (ppg)
4,588 (psi) 10.01 (ppg)
e
e
Printed: 7/13/2004 9:13:43 AM
287 (psi
600 (psi
9.50 (ppg)
8.70 (ppg)
3,354.0 (ft)
8,823.0 (ft
3,462.0 (ft
0,797.0 (ft
e
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
5/25/2004 20:00 - 00:00 4.00 MOB P PRE Held PJSM Blow down and disconnect service lines, prepare
Camp, Tuck shop for move. Pull pit complex away from rig and
install jeep for move.
5/26/2004 00:00 - 06:00 6.00 MOB P PRE Held PTSM. Move Camp, truck shop and pit complex from
P-27 to A-30. Components on location at 0:600 hrs.
(Rig crew preparing rig for move, lay down derrick and pull rig
off P-27. Pickup mats,and herculite, clean up location.)
06:00 - 09:00 3.00 MOB P PRE Lay mats for camp and truck shop spot same. Position pit
module out of the way.
09:00 - 00:00 15.00 MOB P PRE Move rig from P-27 to A-30. Rig on location @ 22:00 hrs, Set
mats and herculite for Rig.
5/27/2004 00:00 - 02:00 2.00 RIGU P PRE Held PTSM. Spot Rig on A-30
02:00 - 03:00 1.00 RIGU P PRE Set mats for pit module, spot pits
03:00 - 04:00 1.00 RIGU P PRE Burm cellar, close cellar doors, spot cuttings tank, hookup
service lines
04:00 - 04:30 0.50 RIGU P PRE Held PJSM, Raising derrick.
04:30 - 05:30 1.00 RIGU P PRE Raise and pin derrick.
05:30 - 08:00 2.50 RIGU P PRE Bridle down, tie back bridle lines, pin skate chute and clean
Rig.
08:00 - 10:00 2.00 WHSUR P DECOMP Take on Seawater in pits, Rig up to cirulate out freeze protect.
Load DP in pipe shed.
Accept Rig @ 08:00 hrs. on 5/27/2004
10:00 - 11 :30 1.50 WHSUR P DECOMP Rig up DSM lubricator, zero pressure on annulus, pull BPV and
rig down lubricator.
11 :30 - 12:00 0.50 WHSUR P DECOMP Pressure test lines to 3,500 psi ok.
12:00 - 14:30 2.50 KILL P DECOMP Displace 155 bbls diesel from well taking returns to cuttings
tank. circulating rate 3 bpm @ 90 psi.
14:30 - 16:00 1.50 KILL P DECOMP Circulate one complete hole volume 245 bbls, Rate 6 bpm @
570 psi, monitor well (static)
16:00 - 18:30 2.50 WHSUR P DECOMP Install and test TWC to 1,000 psi, nipple down tree and adapter
flange, inspect lock down srews, and lift threads on hanger, ok
made up 4.5" XO into hanger 7 1/2 turns.
18:30 - 21:00 2.50 BOPSUF P DECOMP Nipple up 135/8" spacer spool, BOPs and drilling nipple.
21 :00 - 22:00 1.00 BOPSUP P DECOMP Rig up BOP test equipment
22:00 - 00:00 2.00 BOPSUF P DECOMP Test BOP, choke manifold, floor valves, IBOP, and Topdrive to
250 psi. low and 3,500 psi high.
The position indicator shaft on the HCR valve started leaking.
The blind rams and two choke valves and HCR valve remain to
be tested.
Chuck Scheeve with AOGCC witnessed BOP test.
5/28/2004 00:00 - 03:00 3.00 BOPSUP N RREP DECOMP Held PTSM. Change out choke HCR Valve
03:00 - 04:30 1.50 BOPSUP P DECOMP Test Choke HCR valve, blind rams, and three choke manifold
valves to 250 psi low 3,500 psi high. unable to test lower pipe
rams at this time, due to the limited space between the lower
rams and tool joint of the test joint.
04:30 - 05:00 0.50 BOPSUP P DECOMP Rig down test equipment
05:00 - 06:30 1.50 BOPSUPP DECOMP Rig up DSM lubricator and pull TWC, Rig down lubricator
06:30 - 07:00 0.50 PULL P DECOMP Monitor well, makeup landing joint, back out lockdown screws
07:00 - 07:15 0.25 PULL P DECOMP Pull tubing hanger to rig floor. Pickup weight 65,000#
07:15 - 10:00 2.75 PULL P DECOMP Circulate one hole volume 245 bbl. 6 bpm @ 600 psi. Monitor
well. R/U spooling unit for control lines, Lay down tubing
hanger and landing joint.
Printed: 7/13/2004 9:13:52 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 717/2004
Rig Number:
Spud Date: 6/6/1985
End: 717/2004
5/28/2004 10:00 - 17:00 7.00 PULL P DECOMP Held PJSM. POH lay down 88 jts 4.5" tubing, SSSV, and cut
joint. recovered 27 control line clamps and 3 stainless steel
bands.
17:00 - 17:30 0.50 CLEAN P DECOMP Rig down tubing handling equipment
17:30 - 19:30 2.00 CLEAN P DECOMP Rig up BOP test equipment and test lower pipe rams to 250 psi
low, 3,500 psi high. Rig down test equipment, pull test plug and
install wear ring.
19:30 - 00:00 4.50 CLEAN P DECOMP Held PJSM, RIH, pickup 108 joints of 4" Dp and rack back in
derrick
5/29/2004 00:00 - 03:00 3.00 CLEAN P DECOMP Held PTSM, RIH Pickup 66 joints 4" DP and rack back in
derrick
03:00 - 04:30 1.50 CLEAN P DECOMP Pickup clean out assembly,8.5" flat bottom mill, Bit sub, XO, 9
DC's, Float sub, Jars, XO, 23 Joints 4" HW
04:30 - 05:00 0.50 CLEAN P DECOMP Service rig and topdrive.
05:00 - 09:30 4.50 CLEAN P DECOMP RIH, with clean out assembly, picking up 4" DP 1X1. Tag top of
fish @ 3,507'
09:30 - 10:30 1.00 CLEAN P DECOMP Picked up 5' above top of fish and pumped 35 bbl. weighted,
high vis. sweep, Pump rate 600 gpm @ 1,450 psi, rotating drill
string at 120 rpm, torque 2,000ftllbs. Pickup weight = 100,000#
down weight = 95,000#, string weight = 100,000#. Sweep
brought back minimal increase of well debris.
10:30 - 12:00 1.50 CLEAN P DECOMP Held PJSM. POH with clean out assembly.
12:00 - 13:00 1.00 CLEAN P DECOMP Monitor well at BHA, rack back HW and DCs, lay down mills.
13:00 - 16:30 3.50 DHB P DECOMP Held PJSM. Rig up Schlumberger E-line, RIH with HES bridge
plug and CCUGR, set bridge plug @ 3,466', Log out of hole
with Gamma Ray for well tie in. Rig Down Schlumberger tools.
16:30 - 17:30 1.00 DHB P DECOMP Held PJSM, Rig up test equipment, and test 9 5/8" casing to
3,500 psi. record test on chart. Rig down test equipment.
17:30 - 21 :00 3.50 STWHIP P WEXIT Held PJSM, Pickup Mills, Whipstock, MWD, and orient. Pickup
remaning BHA. test MWD. RIH to 3,390'.
21 :00 - 21 :30 0.50 STWHIP P WEXIT Break circulation, orient whipstock 40 deg. right of high side,
Tag bridge plug and set anchor with 20k, pickup to confirm set,
set down 40k and shear off whipstock. Top of Whipstock @
3,446' bottom of whipstock @ 3,462'
Pickup weight = 105,000# down weight = 100,000#
21 :30 - 22:00 0.50 STWHIP P WEXIT Displace well with 9.5 ppg LSND mud @ 450 gpm 705 psi.
22:00 - 00:00 2.00 STWHIP P WEXIT Mill Window from 3,446' to 3,451' With 5k wob, 450 gpm @
900 psi, 80 rpm, 5,000 ftllbs torque.
5/30/2004 00:00 - 04:30 4.50 STWHIP P WEXIT Mill Window from 3,451' to 3,462' With 5k wob, 460 gpm @
900 psi, 100 rpm, 5,000 ftllbs torque. Pumped a 50 bbl
weighed high vis sweep (10.5 ppg) @ 3,462', had a
considerable increase in metal cuttings when sweep came
back. Mill formation from 3,462' to 3,474' 8-10 K wob, 460 gpm
@ 900 psi 120 rpm, 5500 ftllbs torque.
04:30 - 05:00 0.50 STWHIP P WEXIT Circulate 50 bbl high vis weighted sweep. (10.5 ppg). Did not
see a significant amount of cuttings at surface when sweep
came back. Recovered a total of 285 Ibs. of metal cuttings
during milling operations.
05:30 - 06:30 1.00 STWHIP P WEXIT Pull mills up inside window. Rig up testing equipment and
perform FIT at 3,446' 3,365' tvd. mud weight 9.5 ppg. 287 psi
= EMW 11.1 ppg.
06:30 - 08:30 2.00 STWHIP P WEXIT Held PJSM,Monitor well, Pump dry job and POH with milling
assembly.
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
5/30/2004 08:30 - 10:00 1.50 STWHIP P WEXIT Held PJSM, Lay down 9 DCs and Baker mills. Upper srting mill
was in gauge.
10:00 - 12:00 2.00 STWHIP P WEXIT Pull wear ring, Rig up and flush BOP stack, Blow through
choke and kill lines. Instal wear ring. Clear floor of milling tools.
12:00 - 13:00 1.00 STWHIP P WEXIT Held PJSM, Slip and cut drilling line. Inspect and adjust brakes.
13:00 - 13:30 0.50 STWHIP P WEXIT Service Rig and topdrive.
13:30 - 16:00 2.50 STWHIP P WEXIT Held PJSM, Pickup 8.5" drilling assembly as per Directional
driller, orient and shallow test MWD.
16:00 - 17:30 1.50 STWHIP P WEXIT RIH with 8.5" driling assembly, picking up 4" DP to 3,411'
17:30 - 18:00 0.50 STWHIP P WEXIT Establish ECD base line, orient BHA and work through window,
(no problems)
18:00 - 00:00 6.00 DRILL P INT1 Directional drill 8.5" hole from 3,474' to 4,464' Drill with 8 - 12k
wob, 100 rpm, torque on bottom = 3,000 ftIIbs, off bottom =
2,000 ft/lbs. pump rate 550 gpm with 1,820 psi, on bottom,
1,645 psi off bottom. Pumped weighted (11.5 ppg) high sweep
@ 3,985',5% increase in cuttings. Calculated clean hole ECD
= 10.35, Actual = 10.5.
5/31/2004 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8.5" hole from 4,464' to 6,185' Drill with 15 - 20k
wob, 100 rpm, torque on bottom = 5,000 ft/lbs, off bottom =
4,000 ftllbs. pump rate 580 gpm with 2,500 psi, on bottom,
2,380 psi off bottom. Pickup weight = 135,000# down weight =
110,000#, rotating weight = 120,000#, Calculated clean hole
ECD = 10.26, Actual = 10.48. Pumped 25 bbl high vis weighted
sweep (11.5 ppg) at 5,707', had a 30% increase in cuttings
when sweep came back.
ART = 4.9 AST = 1.8 ADT = 6.7
12:00 - 00:00 12.00 DRILL P INT1 Directional drill 8.5" hole from 6,185" to 7,811' Drill with 15 -
20k wob, 120 rpm, torque on bottom = 5,500 ft/lbs, off bottom =
4,000 ft/lbs. pump rate 580 gpm with 3,260 psi, on bottom,
2,960 psi off bottom. Pickup weight = 155,000# down weight =
120,000#, rotating weight = 135,000# Calculated clean hole
ECD = 10.26, Actual = 10.75. Pumped 25 bbl high vis weighted
sweep (11.5 ppg) at 6,280' - 6,854' - 7,337", all had a 30 - 40%
increase in cuttings when sweep came back, no reduction in
ECD.
ART = 5.8 AST = 1.8 ADT = 7.60
6/1/2004 00:00 - 01 :30 1.50 DRILL P INT1 Held PTSM, Directional drill 8.5" hole from 7,811' to 8,003' Drill
with 15 - 20k wob, 120 rpm, torque on bottom = 5,500 ft/lbs, off
bottom = 4,000 ft/lbs. pump rate 580 gpm with 3,300 psi, on
bottom, 2,990 psi off bottom.Pickup weight = 160,000# down
weight = 120,000#, rotating weight = 135,000# Calculated
clean hole ECD = 10.26, Actual = 10.68
ART =.7 AST =.4 ADT = 1.1
01 :30 - 03:00 1.50 DRILL P INT1 Pump 30 bbl high vis weighted sweep, rotating string at 120
rpm, reciprocating full stand, circulate until shakers cleaned up.
03:00 - 06:00 3.00 DRILL P INT1 Held PJSM, POH to 6,575' pump dry job, POH to shoe, had
some tight spots 5,860'- 5555' - 4440' 10-15k over pull wiped
back through,no problem, saw nothing pulling through window.
06:00 - 06:45 0.75 DRILL P INT1 Service rig and topdrive, install clamp on topdrive blower hose.
06:45 - 09:30 2.75 DRILL P INT1 Held PJSM, RIH to 7,908' Fill pipe every 25 stds. no hole
problems on trip in.
09:30 - 11 :00 1.50 DRILL P INT1 Break circulation, staging up pumps, ream from 7,908' to 8,003'
adjust flow rates to keep ECD with in set limits. Circulate
Printed: 7/13/2004 9:13:52 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start:
Rig Release:
Rig Number:
5/26/2004
7/7/2004
Spud Date: 6/6/1985
End: 7/7/2004
6/1/2004 09:30 - 11 :00 1.50 DRILL P INT1 bottoms up. Rotating at 120 rpm, reciprocate full stand,
circulating rate 520 gpm @ 3,010 psi. ECD was 10.97, bottoms
up brought back, large amounts of cuttings, ECD dropped back
to 10.45
11 :00 - 22:00 11.00 DRILL P INT1 Held PTSM, Directional drill 8.5" hole from 8,003' to 9,246' Drill
with 20 - 25k wob, 80 rpm, torque on bottom = 8,000 ftllbs, off
bottom = 5,500 ftllbs. pump rate 520 gpm with 3,900 psi, on
bottom, 3,720 psi off bottom. Pickup weight = 180,000# down
weight = 125,000#, rotating weight = 150,000#. Drilling through
the Colville BHA has seen up to 3 deg/100 drop tendency,
which has required a lot of sliding to maintain hole angle.
Started weighting up at 9,014' with 500 bbls of 13.2 ppg spick
fluid, with 11 ppg mud at surface and all fluid transfers stopped,
started seeing losses. Initial loss 69 bbls.
22:00 - 22:30 0.50 DRILL P INT1 Shut down drilling and monitor well for 30 min. flowed back 24
bbls, flow stopped after 30 min.
22:30 - 00:00 1.50 DRILL P INT1 Continued drilling ahead,from 9,246' to 9,342' Reduced flow
rate to 480 gpm to keep ECD at or below 12 ppg, calculated
ECD = 11.81, Running 8 sacks per hour MIX- II fine, from
22:30 to 23:30 losses were 55 bph. then slowed to 26 bph.
AST = 4.14 ART = 4.49
6/2/2004 00:00 - 01 :30 1.50 DRILL P INT1 Continued drilling ahead,from 9,342' to 9,438' Pump rate 480
gpm with 3,850 psi on bottom 3,600 off bottom rotating 80 rpm
with 8,000 ftlllb torque on bottom 5,500 off bottom, 15 to 20k
wob. Losses are still 26 bph. At 9,438' while back reaming
connection, saw some eratic torque, 40' off bottom, then it
smoothed out, with stand all the way up, lost complete returns.
01 :30 - 03:00 1.50 DRILL N DPRB INT1 Reciprocate pipe, monitor well Fluid level falling when static 30
bph. Mix up 50 bbl LCM pill, 40 ppb MIX -II, and 10 ppb
G-seal. (Mix 500 bbls 11.ppg mud at M-I Mud plant.)
03:00 - 04:30 1.50 DRILL N DPRB INT1 Pump 50 bbl LCM pill spot on bottom at 2 bpm with 525 psi. no
returns while pumping pill, lost 159 bbls.
Take on 290 bbls of 11.ppg mud from mud plant.
04:30 - 07:00 2.50 DRILL N DPRB INT1 Monitor well. move sweep up hole 400' every hr. pump 20 bbls
@ 2 bpm with 450 psi. static losses 30 bph while monitoring
well.
07:00 - 12:00 5.00 DRILL N DPRB INT1 Held PJSM, POH hole swabbing, fill hole through DP, capacity
plus displacment, @ 6,505' hole quit swabbing, switched to
filling hole with trip tank. POH to 3,411'
Total losses for past 12 hrs. = 257 bbls.
12:00 - 15:00 3.00 DRILL N DPRB INT1 Monitor well, make up topdrive at 3,411' began pumping 60 bbl
LCM pill consisting of 20 ppb MI-seal, 10 ppb nut plug medium,
10 ppb mix seal II medium, 10 ppb mix seal II fine, 10 ppb G -
seal. stage up pumps to 450 gpm with 1,460 psi. ECD = 11.22,
@ 450 gpm lossing 60 bph. Reduced flow rate to 300 gpm, 950
psi. while spotting pill to minimize losses. Lost 34 bbls while
pupmping pill.
15:00 - 15:30 0.50 DRILL N DPRB INT1 POH to 2,646'
15:30 - 16:30 1.00 DRILL N DPRB INT1 Once above pill, made up topdrive and stage up pumps to 450
gpm, with 1,360 psi. and monitor losses. Lost 13 bbls in 30
min.
16:30 - 17:30 1.00 DRILL N DPRB INT1 Shut well in, and bullhead 30 bbls, away @ 6 spm with 50 psi.
Printed: 7/13/2004 9:13:52 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 7ES
Start:
Rig Release:
Rig Number:
5/26/2004
7/7/2004
Spud Date: 6/6/1985
End: 7/7/2004
612/2004 17:30 - 18:00 0.50 DRILL N DPRB INT1 Open up well, Stage up pumps to 450 gpm, 1,350 psi. Lost 2
bbl in 15 min. 8 bph.
18:00 - 20:00 2.00 DRILL N DPRB INT1 Held PJSM, POH monitor well at BHA, no losses.
20:00 - 21 :00 1.00 DRILL N DPRB INT1 Rack back drill collars, down load MWD.
21 :00 - 00:00 3.00 DRILL N DPRB INT1 Lay down 8.5" stabalizer, motor and bit, Pickup new bit and
motor and orient, install circulating sub on top of the MWD,
pickup drill collars and HWDP, and shallow test MWD.
Total losses for past 12 hrs. = 90 bbls.
6/3/2004 00:00 - 01 :30 1.50 DRILL N DPRB INT1 Held PTSM, Slip and cut drilling line, Service rig.
01 :30 - 02:30 1.00 DRILL N DPRB INT1 Held PJSM, RIH from 910' to 3,310'. Makeup Topdrive and
wash from 3,310' to 3,406' pump rate 150 gpm with 290 psi.
02:30 - 03:45 1.25 DRILL N DPRB INT1 Stage up pumps from 150 gpm @ 290 psi, to 350 gpm @ 970
psi, Cut mud weight from 11.0 ppg to 10.8 ppg. Running 25
bph water, @ 350 gpm we are losing 30 bph. With the 10.8 ppg
mud on the backside @ approximately 1,970' started seeing an
increase in pit volume. With 10.8 ppg. in and out the water was
turned off. Pumping at 350 gpm had no losses, increased rate
to 450 gpm with 1480 psi. no losses, ECD 11
03:45 - 05:00 1.25 DRILL N DPRB INT1 Stage in the hole from 3,410' to 5,515'. hole giving proper
displacment.
05:00 - 06:30 1.50 DRILL N DPRB INT1 Make up top drive and break circulation, stage up pumps to
350 gpm @ 1290 psi. no losses at 350 gpm, increase flow rate
to 400 gpm @ 1,755 psi, ECD = 11.8 initially lost 31 bbls. in 30
min. then quit losing. continue circualting at present rate.
06:30 - 07:30 1.00 DRILL N DPRB INT1 RIH from 5,515' to 7,519' slow, monitoring hole for losses. (no
losses)
07:30 - 09:00 1.50 DRILL N DPRB INT1 Makeup topdrive stage up pumps to 450 gpm @ 2,530 psi.
Circulate until 10.8 ppg mud back to surface, ECD 11.44. (no
losses)
09:00 - 10:00 1.00 DRILL N DPRB INT1 RIH from 7,519" at 8,575' took weight 25k
10:00 - 10:30 0.50 DRILL N DPRB INT1 Makeup topdrive @ 8,575' stage pumps up to 200 gpm, 600
psi. no returns. Start Pumping out from 8,575' to 8,284'
pumping 3/4 bpm. to keep hole full, no returns hole swabbing.
unable to establish circulation.
10:30 - 11 :30 1.00 DRILL N DPRB INT1 POH slow from 8,284' to 7,519' did not see any excess drag,
hole not swabbing when pulling slow, 2 min per/std.
11 :30 - 12:00 0.50 DRILL N DPRB INT1 Makeup topdrive at 7,519' stage up pumps to 450 gpm 2,340
psi. no losses in 30 min. ECD =11.45
Total mud lost in the last 12 hrs.= 30 bbls
12:00 - 17:00 5.00 DRILL N DPRB INT1 Wash in the hole from 7,519' to 8,849' staging up pumps from
200 gpm to 450 gpm 2,475 psi.ECD 11.48, lost 35 bbls, while
washing in the hole.
17:00 - 19:45 2.75 DRILL N DPRB INT1 Circulate and condition Mud at 8,849' until 10.8 ppg. mud back
at surface, rotating at 115 rpm, torque 5,075 ftllbs. 450 gpm
with 2,720 psi. ECD 11.47
19:45 - 23:00 3.25 DRILL N DPRB INT1 Wash and ream from 8,849' to 9,431 staging up pumps from
200 gpm to 450 gpm.2,800 psi rotating 75 rpm with 5000 ftllbs
of torque, ECD 11.48 - 11.32, Started cutting mud weight back
to 10.6 ppg while reaming to bottom. Had losses from 4 bph to
18 bph. at 9,110' saw a increase in torque, and completly lost
returns for 10 seconds then got full returns back, lost 6 bbls.
worked back through this spot and didn't see anything.
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6/3/2004 19:45 - 23:00 3.25 DRILL N DPRB INT1 Continued reaming to bottom with out any problem.
23:00 - 00:00 1.00 DRILL N DPRB INT1 Circulate until 10.6 ppg mud back at surface. 450 gpm, 2,865
psi. Increase rpm from 75 to 120, rotary torque 5150 ftllbs.
ECD 11.32. With 10.6 ppg mud going in and coming out ECD
11.22. while circulating bottoms up losses were 3 bph. Total
Losses for the last 12 hrs. = 84 bbls.
Establish baseline ECD. With 10.6 ppg mud
450 gpm, 100 rpm, ECD = 11.21
480 gpm, 100 rpm, ECD = 11.25
500 gpm, 100 rpm, ECD = 11.27
6/4/2004 00:00 - 12:00 12.00 DRILL P INT1 Held PTSM, Directional drill 8.5" Intermediate hole from 9,438'
to 9,980' with 10k wOb, 450 gpm with 3,030 psi on bottom,
2,8700 off bottom, 130 rpm, torque on bottom 7,500 ftllbs.
7,000 tf/lbs off bottom, Pickup weight = 195,000#, down weight
= 140,000#, string weight = 160,000#, ROP 50-90 fph.
Calculated ECD =11.20 actual 11.34, seeing a small amount of
splintered shale across shakers, Let weight creep up to 10.7
ppg. Total losses for last 12 hrs. = 39 bbls. ART = 7.91 AST =
1
12:00 - 00:00 12.00 DRILL P INT1 Held PTSM, Directional drill 8.5" hole from 9,980' to 10,420'
with 10k wob, 450 gpm with 3,230 psi on bottom, 3,120 off
bottom, 130 rpm, torque on bottom 9,000 ftllbs. 8,000 tf/lbs off
bottom, Pickup weight = 200,000# down weight = 143,000#
srting weight = 165,000#, BHA seems to be holding angle while
rotating, but required two slides to maintain course, hand some
problems on one slide getting weight to the bit, BHA hanging
up, occasionally stalling motor. Calculated ECD =11.35 actual
11.45, at 10,292' pumped a 15 bbl LCM sweep, consisting of
20 ppb MI seal medium, 10 ppb mix seal fine, 10 ppb mix seal
medium, 10 ppb G-seal, no change in ECD, but sweep brought
back twice as much splintered shale than had been seen in
samples before. Average Losses between 5 - 14 bph. Lost a
total of 101 bbls, in past 12 hrs. ART = 7.2 AST = .8
6/5/2004 00:00 - 08:00 8.00 DRILL P INT1 Held PTSM, Directional drill 8.5" hole from 10,420' to 10,774'
with 10k wob, 450 gpm with 3,050 psi on bottom, 2,880 off
bottom, 130 rpm, torque on bottom 9,000 ftllbs. 8,000 tf/lbs off
bottom, Pickup weight = 200,000# down weight= 145,000#
string weight = 165,000. Formation tops coming in on plan.
Weight up to 10.8 at 10,700' Calculated ECD =11.35 actual
11 .42
08:00 - 09:00 1.00 DRILL P INT1 Circulate up sample from 10,774' @ 450 gpm with 2900 psi,
Pump 25 bbl sweep, 1 ppb duo-vis,1 ppb super sweep.
09:00 - 12:00 3.00 DRILL P INT1 Drill ahead from 10,774' to 10,797', Circulate up sample, from
10,784' and 10,792' Geologist called TD 10,797' based on
formation samples. Total losses past 12 hrs. = 58 bbls
ART = 5.5 AST = .7
12:00 - 13:00 1.00 DRILL P INT1 Held PTSM, Circulate until shakers cleaned up. @ 450 gpm
with 3,100 psi. Rotating at mximum rate, 130 rpm
13:00 - 15:30 2.50 DRILL P INT1 Monitor well, POH from 10,797' to 10,580' , hole swabbing,
makeup topdrive and pump out from 10,580' to 9,250' @ 200
gpm with 960 psi. Monitor well. RIH from 9,250' to 10,675'
(slowly)
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6/5/2004 15:30 - 16:00 0.50 DRILL P INT1 Makeup topdrive and ream from 10,675' to 10,797' Staging up
pumps to 450 gpm, 8' of fill on bottom.
16:00 - 19:00 3.00 DRILL P INT1 Pump 30 bbl high vis with 1 ppb super sweep, circulate and
condition mud for running 7" liner, reducing YP to 19,
Circulating rate 450 gpm @ 3100 psi. rotating at 130 rpm.
Monitor well.
19:00 - 00:00 5.00 DRILL P INT1 Held PTSM, Pump out from 10,997' to 9,300', At 9,300' monitor
well for 10 min. flowed back 3 bbls, quit flowing after 10 min.
Attempted to pull pipe without pumping, pulled one stand, hole
swabbing but not pulling tight, ran stand back down, on down
stroke mud is going south. Continued pumping out from 9,300'
with 350 gpm @ 1,560 psi. From 8,667' to 8,380' began seeing
excess drag of 10 - 15k and slight packing off. At 8,380 started
back reaming back ream from 8,380 to 7,900' more as a
preventative measure, acts like cuttings beds, pumped out
from 7,900 to 7,137', attempt to pull one stand without
pumping, still swabbing, and pushing fluid away going down.
Total mud lost in last 12 hrs = 48 bbls
6/6/2004 00:00 - 02:00 2.00 DRILL P INT1 Held PTSM, Circulate two bottoms up at 7,137' (14,000) stks.
Flow rate 400 gpm with 2025 psi Rotating at 130 rpm ECD 11.5
Mix 260 bblliner running pill consisting of 4.5 ppb G-seal, 8
ppb Glass beeds fine, 3.5 ppb Glass beeds course. Pump pill
to the bit with 1,200 stks.
02:00 - 06:30 4.50 DRILL P INT1 POH pumping out from 7,137' to 3,310' spot liner running pill
from 7,137' to shoe at 3,310' while pumping out, pump 115
stks. every stand, 6.7 bbls. Hole still swabbing, no excess drag.
06:30 - 07:00 0.50 DRILL P INT1 Circulate bottoms up at shoe,450 gpm with 1,750 psi. monitor
well
07:00 - 09:00 2.00 DRILL P INT1 POH, from 3,310' filling hole with trip tank, hole taking proper
fill.
09:00 - 11 :30 2.50 DRILL P INT1 Held PJSM, lay down 23 jts. HWDP and BHA
11 :30 - 12:30 1.00 DRILL P INT1 Clear floor of Directional tools, and clean floor.
12:30 - 13:30 1.00 CASE P LNR1 Rig up casing equipment, makeup. Franks fill up tool
13:30 - 18:30 5.00 CASE P LNR1 Held PJSM, Make up float joints and check floats, makeup
torque 8,000 ftllbs. Run 7' 26# L-80 BTC-M casing to 3,420' 80
joints, running speed 3 min per/jt. losing pipe displacement.
18:30 - 20:30 2.00 CASE P LNR1 Break circulation at 3,420' staging pumps up to 3.5 bpm. with
300 psi. circulate bottoms up, lost 33 bbls while circulating.
Make up Baker cement head, hang and secure out of the way.
The pack off rubber on Franks fill up tool was leaking, while
circulating with 300 psi.
20:30 - 21 :30 1.00 CASE N SFAL LNR1 Lay down Franks fill up tool and change out rubber. (Rubber
was damaged while being engaged for circulating)
Well flowed back 14 bbls, while changing out Franks tool.
21 :30 - 00:00 2.50 CASE N LNR1 Continue running 7" 26# L-80 casing from 3,420' to 4,708"
filling every joint. After 10 joints ran wash down 3 joints.
Washed from 3,850' to 3,980' lost 10 bbls. washed from 4,535
to 4,665' lost 7.6 bbls.
6/7/2004 00:00 - 01 :00 1.00 CASE P LNR1 Continue running 7" 26# L-80 casing from 4,708' to 5,357"
filling every joint running speed 3-5 min per / joint. Run 10
joints and wash down 3 joints. When washing down hole is
taking between 8-15 bbls, then flows back 5-6 bbls and stops
flowing.
Printed: 7/13/2004 9:13:52 AM
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6/7/2004 01 :00 - 02:00 1.00 CASE P LNR1 At 5,357' engage Franks tool and broke circulation, stage
pumps up slowly to 3.5 bpm.@ 400 psi. circulate bottoms up
(120 bbls) shut down pumps, lost 40 bbls while circulating, well
flowed back 17 bbls. and quit.
02:00 - 06:00 4.00 CASE P LNR1 Continue running 7" 26# L-80 casing from 5,357' to 7,475' filling
every joint running speed 3-5 min per / joint. Run 10 joints and
wash down 3 joints. When washing down hole is taking
between 8-15 bbls, then flows back 5-6 bbls and stops flowing.
Pickup weight = 215,000, Down weight = 130,000# Ran a total
of 174 joints 7" 26# L-80 BTC-M casing.
06:00 - 07:00 1.00 CASE P LNR1 Held PJSM, Lay down Franks tool, Change out 350 ton
elevators and slips, make up Baker 7" X 9 5/8" Liner Hanger
and ZXPL Liner top packer, pickup 1 single of 4" DP and XO,
make up Top drive.
07:00 - 08:30 1.50 CASE P LNR1 Break circulation, stage up pumps to 4 bpm. 420 psi. Change
out long bails.
08:30 - 11 :30 3.00 CASE P LNR1 RIH with 7" Liner on 4" DP slowly to 8,678', no returns
11 :30 - 12:30 1.00 CASE P LNR1 Make up topdrive, stage pumps up slowly, working pipe to try
and establish circulation, no returns
Lost 196 bbls in the past 12 hrs.
12:30 - 17:30 5.00 CASE P LNR1 Continue running in hole with 7" liner on 4" DP. t010,792',
Pickup baker cement head, and connect high pressure lines.
Pickup weight = 225,000# Slack off weight = 130,000#
17:30 - 20:00 2.50 CEMT P LNR1 Held PJSM, with all rig personel, Pump 5 bbls of water and test
lines to 4,000 psi. pump 15 bbls Mud push 11.8 ppg. Mix and
pump 15.8 ppg class G tail cement @ 3.5 bpm at 820 psi.
started seeing slight returns while pumping cement. Pumped 36
bbl of slurry, release dart with 5 bbls water,and displace with rig
pumps at 5 bpm.at 650 psi. At 1,000 strokes into displacement
showing 5% returns, when cement turned the corner, flow
indicator was showing 19% returns, at this point we were
pumping 300 bpm, and lossing 144 bph. Pumped plug with
calculated strokes, pressued up to 4,000 psi to set liner
hanger, apply 100k down on hanger, bleed off pressure and
check floats, Rotate 20 turns to the right, pulled out of tie back
12'. CIP @ 19:40
20:00 - 21 :00 1.00 CEMT P LNR1 Circulate bottoms up at 5 bpm at 320 psi.
21 :00 - 22:00 1.00 CEMT P LNR1 Held PJSM, Rig down Baker cement head, well flowed back 13
bbls in 1 hr. while rigging down cement head, Well stopped
flowing.
22:00 - 00:00 2.00 CEMT P LNR1 POH with liner running tool. lay down 1 joint of 4" DP and XC,
break connection below rotating dog sub and lay down, Make
up seal assembly and ported sub.
Total Mud lost in last 12 hrs. = 162 bbls.
6/8/2004 00:00 - 02:30 2.50 CEMT P LNR1 Held PTSM. RIH with Baker squeeze assembly, pickup 42
joints of 5" HWDP, run 21 stands of 4" DP from derrick to
3,294'
02:30 - 03:00 0.50 CEMT P LNR1 Pick up cement head, hook up high pressure lines, Sting seal
assembly into Tie back sleeve to confirm depth. Pull out of Tie
back, bottom seals l' above liner top.
03:00 - 04:00 1.00 CEMT P LNR1 Displace well to 9.6 ppg mud at 280 gpm with 650 psi.
04:00 - 04:30 0.50 CEMT P LNR1 Engage seal assembly in top of tie back sleeve, pressure up to
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start:
Rig Release:
Rig Number:
5/26/2004
7/7/2004
Spud Date: 6/6/1985
End: 7/7/2004
6/8/2004 04:00 - 04:30 0.50 CEMT P LNR1 500 psi to test seals. Pickup 6' to expose circulating ports.
Pump 3 bbls, to establish circulation. Close Hydrill and line up
choke manifold.
Establish injection rates of 2 bpm @ 520 psi, 3 bpm @ 635 psi,
4 bpm @740 psi, 5 bpm @ 850 psi.
04:30 - 06:30 2.00 CEMT P LNR1 Schlumberger cementers pump 5 bbls water, test lines to 4,000
psi. Pump 30 bbls Mud-Push 13.0 ppg at 4 bpm with 375 psi
holding 200 psi back pressure with choke. Squeeze 146 bbls
12.0 ppg Class 'G' cement, at 5 bpm at 525 psi. Pump 5 bbls
water to clear lines. Displace cement with rig pumps at 5 bpm
with 575 psi. (445 strokes) final displacement pressure 400 psi.
Slack off 50k rotating 15 rpm to set ZXP liner top packer,
repeat two times to ensure packer is set. Pull seals out of tie
back, and circulate bottoms up to clear any cement left in pipe.
No cement returns.
06:30 - 07:30 1.00 CEMT P LNR1 Pressure test 7" liner, ZXP liner top packer and 9 5/8" casing to
3500 psi for 30 minutes.
07:30 - 08:00 0.50 CEMT P LNR1 RID Cement Head.
08:00 - 09:00 1.00 CEMT P LNR1 POH standing back 4" DP.
09:00 - 11 :00 2.00 CEMT P LNR1 C/O Elevators to 5" & UD 42 Jts of 5" HWDP. C/O Elevators to
4".
11 :00 - 15:30 4.50 BOPSUF P PROD1 R/U & Test BOPE to 250 psi. Low & 3500 psi. High. Upper
IBOP Valve failed.
15:30 - 17:30 2.00 BOPSUF N RREP PROD1 Replaceed Upper IBOP Valve and Lower manuallBOP Valve.
17:30 - 18:00 0.50 BOPSUF P PROD1 Test both IBOP Valves to 250 psi. Low & 3500 psi. High - OK.
18:00 - 19:00 1.00 BOPSUF P PROD1 Service Top Drive & Blocks. Change oil filter on Top Drive.
19:00 - 20:30 1.50 DRILL P PROD1 P/U & M/U 6 1/8" BHA # 5.
20:30 - 00:00 3.50 DRILL P PROD1 RIH P/U 129 Jts. 4" DP from shed. Shallow Test MWD @
1228' - OK. Enterd Liner Top with no problem.
6/9/2004 00:00 - 04:30 4.50 DRILL P PROD1 Complete P/U 4" DP, RIH with DP from Derrick to Tag Up @
10,711.
04:30 - 07:00 2.50 DRILL P PROD1 Drill Cement, Plug, Landing Collar. No apparent hard cement
below Landing collar. Wash down & drill out Float Collar.
MADD Pass per Geology request from 10,728' to 10797' while
cleaning out to Shoe @ 10,797.
07:00 - 09:00 2.00 DRILL P PROD1 Displace well bore with new 8.4 ppg. FloPro Mud.
09:00 - 10:00 1.00 DRILL P PROD1 Slide from 10,797' to 10,817'. AST = .51 Hrs. 250 GPM @
1900 psi.
10:00 - 12:00 2.00 DRILL P PROD1 Circulate Bottoms up in preparation for FIT. 8.7 ppg in & out.
12:00 - 14:00 2.00 DRILL P PROD1 R/U & Perform FIT. TVD = 8,823'. Mud Wt. = 8.7 ppg. 600 psi
Surface Pressure = 10.01 ppg FIT. RID testing equipment.
Blow down kill line. Put bit outside shoe & get ECD Baseline
readings.
14:00 - 16:30 2.50 DRILL N DPRB PROD1 Unable to orient MWD - excessive torque. Continue to circulate
while bringing lubes in mud to 4% and adding EP Mud Lube.
16:30 - 23:30 7.00 DRILL P PROD1 Slide from 10,817' to 10,985'. 260 GPM @ 2200 psi. WOB =
20 K, Up Wt = 210 K, Dn. Wt. = 130K, AST = 4.67 Hrs. Calc
ECD = 9.73 ppg, Actual ECD = 9.80 ppg.
23:30 - 00:00 0.50 DRILL N DFAL PROD1 Attempt to Survey. Unable to get accurate survey. Q/C values
unacceptable. Circulate while trouble shooting MWD.
6/10/2004 00:00 - 02:00 2.00 DRILL N DFAL PROD1 Continue to circulate. Make numerous attempts to obtain
surveys at various depths with no success. Attempted to
perform Roll Test for survey diagnostics. Could not get Tool
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6/10/2004 00:00 - 02:00 2.00 DRILL N DFAL PROD1 Face to change quadrants. Tool displayed only High Side or
SIE Quadrant orientation.
02:00 - 02:30 0.50 DRILL N DPRB PROD1 Observe well while mixing slug and removing blower hose.
Hole flowing very slightly with pumps off.
02:30 - 04:45 2.25 DRILL N DPRB PROD1 Re-establish cirulation. Well stable. Weight up mud 2 points
from 8.7 ppg to 8.9 ppg. No gas nor gas - cut mud to surface.
No sign of influx. No gain or loss.
04:45 - 05:15 0.50 DRILL N DPRB PROD1 Shut down pump & observe well. Still flowing slightly - 1 Bbl.
gain per 10 Minutes.
05:15 - 12:15 7.00 DRILL N DPRB PROD1 Shut Well in & Monitor Pressures. SIDPP = 180 psi, SICP-
110 psi. Increased Mud Wt. from 8.9 ppg. to 9.3 ppg. Began
pumping 9.3 ppg Mud down DP in well Kill Opns. Pumped 45
Bbls then recieved orders from Anc. Team to Stop and bring
mud wt. back to 8.9 ppg. Circulated 8.9 ppg Mud around
getting samples @ bottoms up.
12:15 - 15:00 2.75 DRILL N DPRB PROD1 Shut down Pumps & Monitor Well, taking returns through Full
Open Choke to Trip Tank. Flowed Back 6.9 Bbls.
15:00 - 15:30 0.50 DRILL N DPRB PROD1 Open Rams. RIH, Tag up @ 10,810. Wash to bottom @
10,985' at 2 BPM. Had 30' Soft Fill.
15:30 - 17:00 1.50 DRILL N DPRB PROD1 Circulate up Mud Samples @ 230 GPM @ 1675 psi. while
reciprocating pipe. Up Wt = 210K, Dn Wt. = 130K.
17:00 - 19:00 2.00 DRILL N DPRB PROD1 Monitor Well ( Open to Trip Tank ). Flowed Back 3.3 Bbls.
While waiting on seawater.
19:00 - 19:30 0.50 DRILL N DPRB PROD1 PJSM with all - Rig Crew, Veco Drivers, Mud man, TP & Co.
Rep. Discussed all aspects of job.
19:30 - 21 :30 2.00 DRILL N DPRB PROD1 Displace Well with 8.43 ppg Seawater. Pumping @ 225 GPM
with pres. from 1650 psi to 1475 psi when fully displaced. Took
3 different samples.
21 :30 - 00:00 2.50 DRILL N DPRB PROD1 Monitor Well Flow Back. 39.4 Bbls by Midnight.
6/11/2004 00:00 - 07:00 7.00 DRILL N DPRB PROD1 Continue to monitor flow back from well. 134.7 Bbls (5926 ft)
of influx in Well as of 07:00 Hrs.
07:00 - 08:45 1.75 DRILL N DPRB PROD1 Circulate Bottoms Up. 252 GPM I 1710 psi. to 1475 psi. Gas at
surface just prior to B/U.
08:45 - 11 :30 2.75 DRILL N DPRB PROD1 Monitor Well. Flowed Back 32.6 Bbls.
11 :30 - 11 :45 0.25 DRILL N DPRB PROD1 Circulate Drill Pipe Volume.
11:45-12:15 0.50 DRILL N DPRB PROD1 Monitor Well Flowed Back 4.7 Bbls.
12:15 - 13:30 1.25 DRILL N DPRB PROD1 Shut Well In and Monitor Pressures. SIDPP = 150 psi. SICP=
100 psi.
13:30 - 16:45 3.25 DRILL N DPRB PROD1 Dump Seawater & Take on our old 8.9 ppg. FloPro mud.
Displace Well with the 8.9 ppg Mud @ 5 BPM & 1140 psi to
1600 psi.
16:45 - 19:30 2.75 DRILL N DPRB PROD1 Wash to Bottom (10,985'). Hole very ratty from just under the
Shoe all the way to bottom - 8' of Fill.
19:30 - 20:00 0.50 DRILL N DPRB PROD1 Circulate open hole volume & take check shot survey - MWD
working fine.
20:00 - 20:30 0.50 DRILL P PROD1 Directional drill 6 1/8" Hole Sliding from 1 0,985' to 11,003' 250
GPM & 2050 psi. AST = .25 Hrs. Calculated ECD = 9.7 ppg.
Actual ECD = 9.8 ppg. Hit hard stringer @ 11,001 '. Broke
through in a foot and had no bottom. Lost complete returns.
Slowed pumps - did not regain returns. Fluid level in annulus
just below flowline.
20:30 - 21 :00 0.50 DRILL N DPRB PROD1 POH to Shoe, pumping @ 3 BPM with no returns.
21 :00 - 00:00 3.00 DRILL N DPRB PROD1 Put Hole Fill Pump & Trip Tank on Annulus. Losses initially 5
Printed: 7/13/2004 9:13:52 AM
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6111/2004 21 :00 - 00:00 3.00 DRILL N DPRB PROD1 Bbll Min. Slowing down to 2 Bbls I min.
Mobilize seawater Vac Trucks & Build 50 Bbl, 75 Lb per Bbl,
LCM Pill ( 15 Lb/Bbl each SafeCarb 250, SafeCarb 40 &
LoWate. 10 Lb/Bbl each Nut Plug, Mix2F and Mix 2M). Drop
Dart & open Circ. Sub. Losses = 443 Bbls.
6/12/2004 00:00 - 00:30 0.50 DRILL N DPRB PROD1 Spot 50 Bbl, 75 Lb. per Bbl., LCM pill #1 through Circ Sub.(15
Lb/Bbl each SafeCarb 250, SafeCarb 40 & LoWate. 10 Lb/Bbl
each Nut Plug, Mix2 Fine and Mix 2 Medium). Losses while
pumping = 97.5 Bbls
00:30 - 02:00 1.50 DRILL N DPRB PROD1 Monitor Well, losses down to 11 Bbl/ Hr.
02:00 - 02:45 0.75 DRILL N DPRB PROD1 POH 10 Stands Slowly. Hole taking 16 Bbll Hr.
02:45 - 04:15 1.50 DRILL N DPRB PROD1 Circulate Bottoms Up 4 BPM @ 325 psi. 98 Bbls lost to Hole.
No Gas @ B/U.
04:15 - 04:30 0.25 DRILL N DPRB PROD1 Monitor Well - on Trip Tank. 19 Bbls Lost
04:30 - 05:15 0.75 DRILL N DPRB PROD1 RIH 10 Stands to Shoe.
05:15 - 05:45 0.50 DRILL N DPRB PROD1 Spot 50 Bbl, 75 Lb. per Bbl., LCM Pill # 2 through Circ Sub.(15
Lb/Bbl each SafeCarb 250, SafeCarb 40 & LoWate. 10 Lb/Bbl
each Nut Plug, Mix2 Fine and Mix 2 Medium).
05:45 - 08:30 2.75 DRILL N DPRB PROD1 Monitor well - on Trip tank. 135 Bbls Lost. Mix LCM Pill #3.
08:30 - 09:30 1.00 DRILL N DPRB PROD1 Spot 50 Bbl, 67 Lb. per Bbl., LCM Pill # 3 through Circ Sub.(15
Lb/Bbl SafeCarb 250, 10 Lb/Bbl SafeCarb 40, 12 Lb/Bbl each
M-I Seal C & M, 10 Lb/Bbl Nut Plug, 7.5 Lb/Bbl Mix 2 Medium).
Losses while pumping = 56.6 Bbls.
09:30 - 17:00 7.50 DRILL N DPRB PROD1 Monitor Well - on Trip Tank. No Losses. Well flowing again -
63.2 BBI Gain, avg 8.4 BPH. Securing and transporting drilling
mud to location. Condition mud to proper weight & properties.
17:00 - 18:30 1.50 DRILL N DPRB PROD1 POH to 8,403' - Circ sub @ 8,225'. Gained 14.8 Bbls.
18:30 - 19:00 0.50 DRILL N DPRB PROD1 Attempt to circulate - pressured up in String. Circ. Sub plugged.
Unable to unplug with pump and pipe movement.
19:00 - 21 :00 2.00 DRILL N DPRB PROD1 R/U Long Bails & Prepare for E-Line. Monitor Well. Gained
46.5 Bbls.
21 :00 - 00:00 3.00 DRILL N DPRB PROD1 PJSM wI SWS E-Line & Rig Crew. R/U SWS & M/U Tubing
Punch Gun, CCL 7 Weight bar. ( 2 ft - 9 Shots). RIH wI Gun.
6/13/2004 00:00 - 01 :30 1.50 DRILL N DPRB PROD1 Continue RIH wI SWS 1 11/16" Tubing Punch Gun. Set on
depth in middle of 1 st. Jt. of Drill Pipe 92' above circ sub. Put
300 psi on DP and fire guns (9 Shots from 8115' to 8117'.)
Pressure dropped to 180 psi - kicked in pumps and circulated
30 bbls mud down DP @ 1.5 BPM & 2500 psi. POH w/ E-Line
& Guns.
01:30 - 04:15 2.75 DRILL N DPRB PROD1 Displace well to 8.9 ppg old Mud. Staged pumps up to 4 BPM
@ 2460 psi. No Gains I No Losses while displacing. However,
we did see some gas at surface prior to bottoms up.
04:15 - 04:45 0.50 DRILL N DPRB PROD1 Monitor well to Trip Tank. 0.5 Bbls Gain.
04:45 - 05:30 0.75 DRILL N DPRB PROD1 Change back over to short bails while monitoring well. 0.5 Bbl
Gain.
05:30 - 07:30 2.00 DRILL N DPRB PROD1 Circulate bringing mud weight up to 9.1 ppg.
07:30 - 09:30 2.00 DRILL N DPRB PROD1 Monitor well to Trip tank - Still flowing slightly. Shut in & Monitor
pressure. SIDPP = 41 psi. Bleed & Open Well.
09:30 - 10:30 1.00 DRILL N DPRB PROD1 RIH 25 Stands to 10,522' - No Problems.
10:30 - 13:00 2.50 DRILL N DPRB PROD1 Circulate, bringing mud weight up to 9.2 ppg.
13:00 - 18:00 5.00 DRILL N DPRB PROD1 Monitor Well - Stable. POH 5 stands - taking proper
displacement. Pump slug. POH 15 stands - taking proper
displacement. Monitor well - stable. Continue POH to BHA.
Printed: 7/13/2004 9:13:52 AM
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 717/2004
Rig Number:
Spud Date: 6/6/1985
End: 717/2004
6113/2004 18:00 - 19:00 1.00 DRILL N DPRB PROD1 UD last Jt of 4" DP (perforated). Stand back HWDP, Jars &
Flex DC's. UD Smart Iron, B/O Bit.
19:00 - 20:30 1.50 DRILL N DPRB PROD1 Clear & clean floor. RIH wI HWDP, Jars & DC's. Attempt to circ
- No success. UD HWDP & Jars. Bottom Jt of HWDP plugged.
DC's OK - Stand back same.
20:30 - 00:00 3.50 DRILL N DPRB PROD1 M/U used bit wI open nozzles, bit sub & XO. RIH on 4" DP.
6/14/2004 00:00 - 03:00 3.00 DRILL N DPRB PROD1 Continue RIH. Break circulation @ 7,849 then every 5 stands
to shoe. M/U Circ Head on single & leave on skate.
03:00 - 04: 15 1.25 DRILL N DPRB PROD1 M/U Top Drive. Circ @ 3 BPM & rotate @ 30 RPM through
tight spots @ 10,850', 10,880', 10,950' & 10,990' Stop @
10,998 - 5' off Bottom.
04:15 - 05:00 0.75 DRILL N DPRB PROD1 Circulate @ 4 BPM & 750 psi. reciprocating DP 40 ft., Lost
returns 10 minutes into circulation. Pulled 3 stands back into
shoe. First 40 ft. pulled off bottom very tight rest pulled with no
drag.
05:00 - 06:45 1.75 DRILL N DPRB PROD1 Monitor losses - evened out @ 96 BPH. Mixing 42 Bbl, 70 PPB
LCM Pill. Losses = 254 bbls.
06:45 - 07:45 1.00 DRILL N DPRB PROD1 Pump 50 bbl. 70 ppb. LCM Pill @ 10,719'.
07:45 - 08:30 0.75 DRILL N DPRB PROD1 POH from 10,719 to 9,666'.
08:30 - 09:00 0.50 DRILL N DPRB PROD1 Pump 50 bbls @ 2 BPM I 110 psi. No Returns
09:00 - 10:30 1.50 DRILL N DPRB PROD1 Circulate over top of hole & monitor returns to Trip Tank.
Losses = 52 BPH.
10:30 - 11 :00 0.50 DRILL N DPRB PROD1 RIH from 9,666' to 10,719'.
11:00-13:15 2.25 DRILL N DPRB PROD1 Monitor Well while mixing 100 ppb, LCM Pill # 2. Losses
slowed to 4 BPH.
13:15 - 14:30 1.25 DRILL N DPRB PROD1 RIH Tag @ 10,940'. Wash down @ 2 BPM I 500 psi to 10,975'.
Wash & Ream @ 2 BPM & 10 RPM to 10,983'.
14:30-15:15 0.75 DRILL N DPRB PROD1 Circulate @ 2 BPM I 475 psi, reciprocating Pipe 30' while
batching up Cement. Hold PJSM wI all Hands.
15:15 -16:00 0.75 REMCM-N DPRB PROD1 Switch to Dowell, Pump 5 Bbls water, pressure test lines to
3000 psi, Pump 5 bbls water followed by 22 bbls (104 sX), 15.8
ppg 'G' Slurry wI yield of 1.16 cU.ft./ sk, follow wI 4.5 bbls water
to balance. Closed bag to hold back pressure. Switched back
to rig pumps and spotted balanced plug wI 95 bbls 9.2 ppg
mud. Lost 59 bbls while cementing & displacing. CIP @ 15:50
Hrs.
16:00 - 17:15 1.25 REMCM-N DPRB PROD1 POH Slowly to 10,305'.
17:15 - 22:45 5.50 REMCM-N DPRB PROD1 Break circulation, Pump 10 BBI nut plug pill to clean DP @ 4
BPM 1650 psi. Cut and slip drilling line 130'. Service Top Drive,
Blocks & Crown
22:45 - 23:00 0.25 REMCM-N DPRB PROD1 Wash down @ 2 BPM 400 psi. Tag Cement @ 10,466' dress to
10,469'. Held 30K down weight with pump.
23:00 - 00:00 1.00 REMCM-N DPRB PROD1 R/U & attempt to test casing to 1500 psi. No Test bled off to
700 psi in 2 minutes. RID test equipment.
6/15/2004 00:00 - 00:30 0.50 REMCM-N DPRB PROD1 Blow down cement line, kill & choke lines
00:30 - 01 :30 1.00 REMCM-N DPRB PROD1 Drill Cement from 10,469' to 10,518'. Med hard cement to
10,500' with two l' voids. Solid cement from 10,500' to 10,518';
Drilled with 10 to 12 K and 35 RPM, 3 BPM.
01 :30 - 03:00 1.50 REMCM-N DPRB PROD1 Circulate out Cement contaminated mud.
03:00 - 03:30 0.50 REMCM-N DPRB PROD1 Re-tested casing (11+ Hrs WOC time) No Test. Pressured up
to 1500 psi - Bled off to 600 psi in 5 minutes.
03:30 - 04:00 0.50 REMCM-N DPRB PROD1 RID teating equipment & blow down all lines.
04:00 - 08:30 4.50 REMCM-N DPRB PROD1 POH, UD Bit, Bit Sub & XO.
Printed: 7/13/2004 9:13:52 AM
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start:
Rig Release:
Rig Number:
5/26/2004
7/7/2004
Spud Date: 6/6/1985
End: 7/7/2004
6115/2004 08:30 - 17:45 9.25 EVAL N DPRB PROD1 P/U HES Champ IV Packer & RIH to 3348'. Test 7" Liner Lap
to 3000 psi. - Good Test. Continue RIH and test numerous
times to determine location of leak. Results: Leak in Liner
between 8070' & 8087'. Cement Plug @ 10,518 tested good.
17:45 - 18:30 0.75 EVAL N DPRB PROD1 RIH from 6612' to 8044'
18:30 - 21 :15 2.75 EVAL N DPRB PROD1 Circulate out dry job & Displace Drill Pipe with 8.34 ppg. Fresh
Water.
21 :15 - 21 :45 0.50 EVAL N DPRB PROD1 Set Champ IV Pkr. @ 8046'. Test Annulus to 1500 psi - Good
Test. Test down Drill Pipe to 1000 psi - bled off to 710 psi in 2
minutes.
21 :45 - 00:00 2.25 EV AL N DPRB PROD1 Open Drill pipe to Trip Tank. Monitor well taking readings every
5 minutes. Flowed 0.9 bbls intermittently from 21 :50 to 23:05 -
no flow thereafter.
6/16/2004 00:00 - 01 :00 1.00 EVAL N DPRB PROD1 Continue to monitor well - no further flow.
01 :00 - 02:00 1.00 EVAL N DPRB PROD1 Un - seat Champ IV Packer. Reverse circulate fresh water from
DP. Pump dry job.
02:00 - 05:00 3.00 EVAL N DPRB PROD1 POH & UD Champ IV Packer.
05:00 - 05:30 0.50 DRILL N DPRB PROD1 M/U Bit & Slick BHA.
05:30 - 09:00 3.50 DRILL N DPRB PROD1 RIH Tag @ 10,511'.
09:00 - 11 :00 2.00 DRILL N DPRB PROD1 Displace Mud with seawater.
11 :00 - 12:00 1.00 DRILL N DPRB PROD1 Close Annular & pressure up to 1100 psi, 110 strokes @ 10
SPM. Pressure bled to 590 psi in 30 min. Flowed back 2.2 bbls
in 15 minutes.
12:00 - 14:30 2.50 DRILL N DPRB PROD1 Drill cement from 10,511' to 10,780', 300 GPM @ 1050 psi, 80
RPM & 11 K Torque.
14:30 - 16:00 1.50 DRILL N DPRB PROD1 Circulate Hi-Vis Sweep, 320 GPM @ 1100 psi, 110 RPM.
16:00 - 17:00 1.00 DRILL N DPRB PROD1 Close Annular & pressure up to 1006 psi, 110 strokes @ 10
SPM. Pressure bled to 610 psi in 30 min.
17:00 - 18:00 1.00 DRILL N DPRB PROD1 Monitor Well - Flowed back 6.1 BBls. in 70 minutes.
18:00 - 18:45 0.75 DRILL N DPRB PROD1 Drill cement from 10,780' to 10,812', 300 GPM @ 950 psi., 80
RPM 10 -11K Torque.
18:45 - 20:15 1.50 DRILL N DPRB PROD1 Circulate Hi-Vis Sweep, 320 GPM @ 1075 psi, 110 RPM. 12K
Torque.
20:15 - 20:45 0.50 DRILL N DPRB PROD1 Monitor Well. Flowed Back 2.9 Bbls in 30 minutes.
20:45 - 21:45 1.00 DRILL N DPRB PROD1 Close Annular & pressure up to 1000 psi, 154 strokes @ 10
SPM . Pressure bled to 575 psi in 30 min.
21 :45 - 23:30 1.75 DRILL N DPRB PROD1 Displace Well to 9.2 ppg Mud - 252 GPM @ 725 psi.
23:30 - 00:00 0.50 DRILL N DPRB PROD1 Monitor Well. Flowed Back 1.3 bbls then quit - Well Stable.
6/17/2004 00:00 - 04:30 4.50 DRILL N DPRB PROD1 Pump dry Job & POH. Stand back HWDP & Jars. UD Bit.
04:30 - 05:30 1.00 DRILL N DPRB PROD1 P/U 3 1/2" Mule Shoe & 27 Jts, 3 1/2", 15.5 ppf, G-105, DP.
05:30 - 09:00 3.50 DRILL N DPRB PROD1 M/U HES 7" Champ Packer and XO to 4" HT-40. RIH to
10,717'.
09:00 - 09:30 0.50 DRILL N DPRB PROD1 Service top Drive & Crown.
09:30 - 10:45 1.25 DRILL N DPRB PROD1 M/U Top Drive & RIH. Tag @ 10,812'. Circulate bottoms up 4.5
BPM @ 575 psi.
10:45 - 12:00 1.25 DRILL N DPRB PROD1 Set Champ IV @ 9950 wI mule shoe @ 10,807'. Attempt
injectivity. Pressured up to 1000 psi. Shoe held pressure.
Repeat 2X same result. Un-seat Pkr, move up & set Pkr @
9935' wI mule shoe @ 10,792'. Attempt injectivity. pressure up
to 1000 psi. Held pressure. Bled off and tried again 3X. Same
results. Un-seat Pkr and UD one single
12:00 - 13:00 1.00 DRILL N DPRB PROD1 Displace Drill Pipe with 8.34 ppg fresh water. Set Pkr @ 9915'
with mule shoe @ 10,772'
Printed: 7/13/2004 9:13:52 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 717/2004
Rig Number:
Spud Date: 6/6/1985
End: 717/2004
6117/2004 13:00 - 14:00 1.00 DRILL N DPRB PROD1 Monitor Well. Flowed back 1.3 Bbls.
14:00 - 15:15 1.25 DRILL N DPRB PROD1 Un - seat Champ IV. Reverse circulate, displacing water with
mud. Pump dry job.
15:15-19:00 3.75 DRILL N DPRB PROD1 POH racking back 4" DP. UD Champ IV Packer.
19:00 - 19:45 0.75 DRILL N DPRB PROD1 UD 27 Jts. 3 1/2" Drill Pipe & Mule Shoe.
19:45 - 21 :00 1.25 DRILL N DPRB PROD1 P/U & M/U Directional Drilling BHA # 8.
21 :00 - 00:00 3.00 DRILL N DPRB PROD1 RIH. Shallow test MWD/LWD @ 3141'. Continue RIH.
6/18/2004 00:00 - 01 :30 1.50 DRILL N DPRB PROD1 Continue RIH to 10,812'.
01 :30 - 04:00 2.50 DRILL N DPRB PROD1 Mix EP MudLube weighted pill & Pump down hole followed by
8.5 ppg. Viscosified Seswater to displace Well.
04:00 - 04:15 0.25 DRILL N DPRB PROD1 Take SPR's and ECD Baseline Readings.
04:15 - 05:00 0.75 DRILL N DPRB PROD1 Monitor well. Flowing back @ 6 BPH.
05:00 - 07:30 2.50 DRILL N DPRB PROD1 Bring pumps up to Drilling rate - 275 GPM. Viscosified
seawater running over shakers. Slow pumps down & continue
to circulate while screening down; allowing the polymers to
shear while staging up the pumps.
07:30 - 09:30 2.00 DRILL P PROD1 Directional Drill from 10,812' to 11,065'. 240 GPM @ 1700 psi.,
All Slide - AST = 1.8 Hrs. WOB = 25 K Projected angle at bit =
89 Deg. wI azimuth of 137 Deg.
09:30 - 10:30 1.00 DRILL P PROD1 Pump out of Hole from 11,065' to 10,984' @ 215 GPM & 1000
psi. Started losing returns. Continue to pump out of hole above
shoe to 10,776'.
10:30 - 11 :30 1.00 DRILL N DPRB PROD1 Slow pumps to 190 GPM @ 408 psi & Monitor losses. Initial
losses averaging 84 BPH. String in LCM slowing pumps to 63
GPM @ 200 psi. losses down to 66 BPH.
11 :30 - 15:00 3.50 DRILL N DPRB PROD1 Drop rod and open Circ. Sub. Continue pumping LCM through
Circ Sub at same rate while mixing 30 Lb/Bbl LCM Pill ( Mix 1/
Course, Nut Plug Medium & MI-Seal Medium - 10 Lb/Bbl.
each) Lost 80 Bbls pumping.
15:00 - 16:00 1.00 DRILL N DPRB PROD1 Monitor Well - Static. Spot remainder of LCM pill around bit
with dry job.
16:00 - 21 :00 5.00 DRILL P PROD1 POH to BHA.
21 :00 - 22:00 1.00 DRILL P PROD1 UD BHA # 8. Well took 15.6 Bbls over calculated
displacement on Trip out of Hole.
22:00 - 00:00 2.00 BOPSUF P PROD1 Pull Wear Bushing. R/U & test BOPE.
6/19/2004 00:00 - 01 :00 1.00 BOPSUF P PROD1 Complete testing BOPE to 250 psi - Low / 3500 psi - High.
Witness of test waived by Chuck Scheve, AOGCC.
01 :00 - 02:00 1.00 BOPSUF P PROD1 Pull Test Plug. Run Wear Bushing & RID Test Equipment.
02:00 - 03:00 1.00 DRILL P PROD1 P/U & M/U BHA # 9. RIH w/ 1 stand of DP and shallow test -
OK.
03:00 - 07:30 4.50 DRILL P PROD1 RIH filling pipe every 30 stands. Hole taking fluid. RIH to shoe
@ 10,797'. Trip losses = 90 Bbls.
07:30 - 08:30 1.00 DRILL P PROD1 Slip & Cut Drilling line & Service Top Drive.
08:30 - 10:30 2.00 DRILL P PROD1 Orient to High Side and wash to bottom @ 11,065'
10:30 - 00:00 13.50 DRILL P PROD1 Directional Drill 6 1/8" Hole from 11,065' to 11,420'. 252 GPM
@ 1700 psi., WOB = 10 - 20K, Rot @ 80 to 100 RPM, Torque
= 8K on bottom and 6K off, P/U Wt. = 200K, Dn Wt. = 145K,
Rot Wt. = 165K. ART = 1.55 Hrs AST = 7.15 Hrs. Calculated
ECD = 9.0 ppg., Actual ECD = 9.26 ppg. Pumping LCM to
keep losses @ +1- 110 BBH. Adding glass beads to slide.
6/20/2004 00:00 - 04:15 4.25 DRILL P PROD1 Directional Drill 6 1/8" Hole from 11,420' to 11,586'.252 GPM
@ 1700 psi., WOB = 10 - 20K, Rot @ 80 to 100 RPM, Torque
= 8K on bottom and 6K off, P/U Wt. = 200K, Dn Wt. = 145K,
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6120/2004 00:00 - 04:15 4.25 DRILL P PROD1 Rot Wt. = 165K. Calculated ECD = 9.12 ppg. , Actual ECD =
9.23 ppg. Pumping LCM to keep losses @ +1- 110 BBH.
Adding glass beads to slide.
04:15 - 05:00 0.75 DRILL P PROD1 Remove suction screen from #1 Mud pump to allow LCM to be
pumped.
05:00 - 19:00 14.00 DRILL P PROD1 Directional Drill 6 1/8" Hole from 11,586' to 12,070'. 257 GPM
@ 1910 psi., WOB = 10 - 25K, Rot @ 100 RPM, Torque = 11K
on bottom and 8K off, P/U Wt. = 205K, Dn Wt. = 140K, Rot Wt.
= 165K. Calculated ECD = 9.32 ppg., Actual ECD = 9.49 ppg.
Pumping LCM to keep losses @ 110 to 130 BBH. Adding
glass beads to slide.
19:00 - 20:30 1.50 DRILL N DPRB PROD1 Lost returns - Flow only 6% - 326 BPH losses. Pull up off
bottom & pump 45 bbl 1 40 ppb LCM pill @ 3 BPM, 1190 psi.
Resumed circulation with 130 BPH Losses.
20:30 - 20:45 0.25 DRILL P PROD1 Continue Dir. Drlg. - Slide from 12,070' to 12,074' Lost All
Returns.
20:45 - 21 :30 0.75 DRILL N DPRB PROD1 Circulate 50 Bbl. 140 ppb LCM Pill - 3 BPM. Losses still @ +
300 BPH.
21 :30 - 21 :45 0.25 DRILL P PROD1 Drill from 12,074' to 12,085'. Rotating. Losses still @ + 300
BPH. Daily ART = 2.22 Hrs, Daily AST = 9.81 Hrs.
21 :45 - 23:30 1.75 DRILL N DPRB PROD1 Pump out of Hole to Shoe @ 10,797'. Pumping @ 3 BPM /790
psi. No returns initially. Regained partial returns @ 11,470'.
23:30 - 00:00 0.50 DRILL N DPRB PROD1 Pump 50 bbll 40 PPB LCM Pill 3 BPM @ 700 psi. Good
Returns.
6/21/2004 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 Continue pumping LCM Pill #3 @ 3 BPM 936 psi. with good
returns.
01 :00 - 02:00 1.00 DRILL N DPRB PROD1 POH slowly to 9460', which is above LCM Pill. With no
problem. Hole took proper displacement.
02:00 - 02:30 0.50 DRILL N DPRB PROD1 Pump 98 Bbls @ 4 BPM - 1134 psi with no returns. Fault still
open.
02:30 - 03:00 0.50 DRILL N DPRB PROD1 RIH back to shoe @ 10,797'. Hole taking fluid.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 Pump 50Bbl 1 50 PPB LCM Pill #4 @ 3 BPM with partial
returns. Pump pessure bounced around from 875 to 1510 psi
May be string starting to plug and/or fault bridging off and
breaking down.
04:00 - 05:45 1.75 DRILL N DPRB PROD1 Monitor well wI Trip tank filling from top. Inially taking 96 BPH -
down to 36 BPH
05:45 - 07:15 1.50 DRILL N DPRB PROD1 Pump 25 PPB LCM pill #5 down String. No returns. Fluid level
stable in riser just below flow line
07:15 - 07:30 0.25 DRILL N DPRB PROD1 Monitor Well. Losses = 7 Bbls for 15 minutes 128 BPH.
07:30 - 08:00 0.50 DRILL P PROD1 Service Top Drive.
08:00 - 09:00 1.00 DRILL N DPRB PROD1 RIH from 10,800' to 12,000'.
09:00 - 09:30 0.50 DRILL N DPRB PROD1 Ream from 12,000' to 12,085'.
09:30 - 12:30 3.00 DRILL P PROD1 Directional Drill 6 1/8" Hole from 12,085' to 12,117'.252 GPM
@ 1620 psi., WOB = 10 - 20K, Rot @ 100 RPM, Torque = 11 K
on bottom and 9K off, P/U Wt. = 215K, Dn Wt. = 135K, Rot Wt.
= 165K. Calculated ECD = 8.65 ppg., Actual ECD = 8.72 ppg.
Drilling with seawater - 100% losses.
12:30 - 13:30 1.00 DRILL N DPRB PROD1 Pump 50 Bbl, Lube Pill w/10 ppb LCM
13:30 - 15:00 1.50 DRILL P PROD1 Directional Drill61/8" Hole from 12,117' to 12,139'.260 GPM
@ 1650 psi., WOB = 10K, All Slide, Torque = 11 K on bottom
and 9K off, P/U Wt. = 215K, Dn Wt. = 135K, Rot Wt. = 165K.
Calculated ECD = 8.65 ppg. , Actual ECD = 8.79 ppg. Drilling
Printed: 7/13/2004 9:13:52 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6/21/2004 13:30 - 15:00 1.50 DRILL P PROD1 with seawater - 100% losses.
15:00 - 00:00 9.00 DRILL N DPRB PROD1 Problems with torque and packing off after connection.
Backream with high torque up to 11,075'. Backream to 11,045'
with full Drlg rate & no adverse hole conditions. Ream to
bottom with no problems. Backream 2nd time - encountered
same adverse hole conditions. Injected Lubes into flow line &
pumped 175 Bbls mud down DP. Worked through tight hole
up to 12,070. Working pipe - very tight.
6/22/2004 00:00 - 00:30 0.50 DRILL N DPRB PROD1 Continue Working tight Hole. Worked free @ 12,060'. Worked
through fault down to 12090' - no problems.
00:30 - 04:00 3.50 DRILL N DPRB PROD1 Backream to shoe. Stage up to 248 GPM @ 1276 psi. Torque
14,000 initially down to 9000 at Shoe.
04:00 - 05:00 1.00 DRILL N DPRB PROD1 Pump 45 Bb18.7 ppg Hi-Vis Mud @ 252 GPM 11520 psi. past
bit.
05:00 - 06:30 1.50 DRILL N DPRB PROD1 Close bag & displace Annulus with 8.7 ppg Flo-Pro mud,
adding EP Mud Lube. Max Pressure 200 psi.
06:30 - 07:00 0.50 DRILL N DPRB PROD1 Inspect Derrick after jarring operations, replace bent keeper
pin.
07:00 - 08:00 1.00 DRILL N DPRB PROD1 Service Rig and topdrive, change out saver sub.
08:00 - 09:30 1.50 DRILL N DPRB PROD1 Replace weight indicator, damaged due to jarring.
09:30 - 10:30 1.00 DRILL N DPRB PROD1 Check brushes on Topdrive traction motor.
10:30 - 12:00 1.50 DRILL N DPRB PROD1 RIH from 10,797' to 10,997 took weight @ 10,997' wash
through tight spot from 10,997 to 11,123'
pump rate 2.5 bpm. rotating 5 rpm through 20 deg dogleg.
Increase Pumps to 106 spm @ 1175 psi, Start MAD pass @
11,150 to confirm MWD tools are working, Continue reaming
from 11,150 to 11,278 with 103 spm at 1,100 psi. torque =
4,500 to 5,000. Pumping 25 bbls Flo-pro down DP at beginnig
of each connection for lubrication, followed by seawater.
Losses for last 12 hrs = 1,972 bbls
12:00 - 15:00 3.00 DRILL N DPRB PROD1 Continue Reaming from 11,278' to 12,139' flow rate 106 spm
@ 1,140 psi. 100 rpm torque = 5,000, Worked through tight
spot from 12,060' to 12,095 several times hole conditions
getting worse, torque has increased, and stalling topdrive, at
14,000 ftIlbs work back to bottom, and attempt to pull above
tight spot without rotating, 65k overpull. Begin back reaming to
get above 12,060' high torque and stalling topdrive, slow pump
rate to 55 spm with 60 RPM. Once above 12,060' increased
flow rate to 106 spm at 1300 psi and work pipe with no more
adverse hole conditions.
15:00 - 17:00 2.00 DRILL N DPRB PROD1 Circulate and monitor losses (220 bph.)
17:00 - 19:00 2.00 DRILL N DPRB PROD1 POH Pumping out from 12,060' to the shoe, had tight spot at
11,090' backream through tight spot.
19:00 - 22:00 3.00 DRILL N DPRB PROD1 Monitor static losses, filling hole from the top while waiting on
form -a- plug pill and Schlumberger to arrive on location.
Average losses = 130 bph.
22:00 - 23:30 1.50 DRILL N DPRB PROD1 Rig up Sclumberger to pump 75 bbl form-a-plug pill (stopped
filling the hole to allow fluid level to drop approximently 1,000')
shut well in.
23:30 - 00:00 0.50 DRILL N DPRB PROD1 Held PJSM, with Company Rep, Toolpusher and
Schlumberger, pumped 5 bbls water and test lines to 2,500
psi. began pumping MI Form -a- plug pill at 3 bpm with 50 psi.
with 40 bbls pumped saw an increase in pressure from 75 psi
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6122/2004 23:30 - 00:00 0.50 DRILL N DPRB PROD1 to 325 psi. pumped 70 bbls of form -a- plug pill final circulating
rate 2.5 bpm @ 650 psi.
Losses for last 12 hrs.= 1,715 bbls
6/23/2004 00:00 - 00:30 0.50 DRILL N DPRB PROD1 Held PTSM, Pump 5 bbls water to clear lines, displace with rig
@ 5 bpm with 1,410 psi, when pill hit the bit the pressure
increased to 1,720 psi. final circulating rate 5 bpm at 1,150 psi
displace an extra 2 bbl to ensure pill is out of the pipe. shut in
TIW valve and rig down Schlumerger, Zero pressure on DP
and annulus.
00:30 - 01 :00 0.50 DRILL N DPRB PROD1 POH 2 stds slowly to 10,606' with Hydrill closed.
01 :00 - 01 :30 0.50 DRILL N DPRB PROD1 Wait 30 min with Well shut in.
01 :30 - 02:00 0.50 DRILL N DPRB PROD1 POH 2 stds slowly to 10,414' with Hydrill closed.
02:00 - 08:00 6.00 DRILL N DPRB PROD1 Allow FAP pill to set up for 6 hrs. with well shut in.
08:00 - 09:00 1.00 DRILL N DPRB PROD1 Check for pressure, open Hydrill and fill hole, calculated top of
fluid 375' down. With hole full monitor for losses hole not taking
tliud sitting static. Circulate bottoms up at 6 bpm @ 1,140 psi.
hole started taking 58 bph.
09:00 - 09:30 0.50 DRILL N DPRB PROD1 Monitor well for losses hole taking 68 bph.
09:30 - 12:00 2.50 DRILL N DPRB PROD1 Pump dry job, blow down Topdrive and POH trom 10,414' to
3,529'
total losses for last 12 hrs. = 332 bbls.
12:00 - 13:30 1.50 DRILL N DPRB PROD1 Held PTSM, POH to BHA, monitor well
13:30 - 14:30 1.00 DRILL N DPRB PROD1 Stand back flex collars lay down MWD, motor and bit.
14:30 - 16:00 1.50 DRILL N DPRB PROD1 Change out Topdrive IBOP valve and test to 250 psi low and
3,500 psi high record on chart.
16:00 - 18:30 2.50 DRILL N DPRB PROD1 P/U BHA orient motor and MWD, shallow test MWD at 597'
250 gpm @ 1050 psi
18:30 - 22:00 3.50 DRILL N DPRB PROD1 RIH to 10,797' filling DP every 30 stds. Hole taking between 80
and 150 bph while tripping in. Fill back side with 310 bbls 8.5
ppg Flo-Pro while tripping in
22:00 - 00:00 2.00 DRILL N DPRB PROD1 Make up T opdrive, fill dp and wash from 10,797' to 11,407' Up
weight = 195k down weight = 105k, Flow rate 66 spm @ 830
psi no returns. Continued washing at current rate, at 11,100'
started seeing slight returns, by 11,407' flow meter was
showing 20% returns 120 bph loss.
Total losses for last 12 hrs. = 1,050 bbls
6/24/2004 00:00 - 00:45 0.75 STKOH N DPRB PROD1 Held PTSM, Trenching from 11,380' to 11,410' with 150L
Toolface, Flow rate 250 gpm @ 1,670 psi, up weight = 200k
down weigth = 11 Ok, losses are 85 bph.
00:45 - 02:00 1.25 STKOH N DPRB PROD1 Time drill from 11,410' to 11,438', with a 150 L Toolface. 250
gpm @ 1675 psi. AIM indicated well was sucssesfuly
sidetracked at 11,410', Losses remain 85 bph.
02:00 - 10:00 8.00 DRILL N DPRB PROD1 Directional drill 6.125" production hole, From 11,438' to 11,885'
with 250 gpm 1,830 psi on bottom 1,670 off bottom, 25k
wob. Sliding until directional objectives are met 108 deg
Azimuth, 91 deg Inc. no problem sliding. The new MWD tool is
showing a 12 degree difference in Azimuth in comparison with
previous tool. Back reaming connections at 100 rpm with 5 to
6K torque. Up weight = 200k, down weight = 150k, string
weight = 172k, torque on bottom = 6 to 7k, torque off bottom =
5 to 6k, Losses remain 70 to 85 bph. Adding 4 sackslhr beads,
and are currently pumping 20 bbls Flo-Pro after each
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6124/2004 02:00 - 10:00 8.00 DRILL N DPRB PROD1 connection. ART = .83 AST = 4.47
10:00 - 12:00 2.00 DRILL N DPRB PROD1 Back ream out of the hole from 11,885' to 11,350' with 100
rpm, torque 4 to 5k, 250 gpm with 1,670 psi. At 11,350 perform
roll test to confirm MWD tool accuracy. Continued back
reaming out to 11,024' with no problems. Pump out from
11,024' to 10,737'
Total losses for last 12 hrs. = 979 bbls
12:00 - 13:00 1.00 DRILL N DPRB PROD1 Held PTSM, Monitor well and service rig and topdrive.
13:00 - 13:30 0.50 DRILL N DPRB PROD1 Orient motor to high side and trip in the hole to 11,648' began
taking weight, Pumped up survey, survey confirmed that we
were in the old hole. POH to 11,400'
13:30 - 16:30 3.00 DRILL N DPRB PROD1 Work BHA through sidetrack, take check shot to confirm that
we are in the new hole. RIH to 11,789' and wash from 11,789'
to 11,885'
16:30 - 20:00 3.50 DRILL N DPRB PROD1 Directional drill 6.125" hole, From 11,885' with 250 gpm 2,200
psi on bottom 1,670 off bottom, 25k wob. Up weight = 200k,
down weight = 150k, string weight = 175k, torque on bottom =
6 to 7k, torque off bottom = 5 to 6k, Losses remain 70 to 85
bph. At 12,015' Lost complete returns, lossing 400 bph initially,
fluid level is falling away on the back side, using hole fill to
keep the back side full, Pump pressure dropped from 2,200 psi
to 1,860 psi on bottom. ECD also dropped from 8.7 to 8.2 all
other parameters remained the same. Continue drilling ahead
from 12,015' unable to keep weight on the bit until 12,065' at
this point the fluid level quit dropping on the back side while
drilling ahead pumping 250 gpm. drilled ahead to 12,139'
20:00 - 00:00 4.00 DRILL P PROD1 Directional drill 6.125" hole, From 12,139' to 12,459', 25 to 30K
wob, 250 gpm @ 1920 psi on bottom, 1,630 psi off bottom, 100
rpm, torque on bottom = 7K, torque off bottom = 5K. AT
12,350' began seeing slight returns 3 to 6% lossing 300 bph.
Total losses for last 12 hrs = 1988 bbls
6/25/2004 00:00 - 02:30 2.50 DRILL P PROD1 Directional drill 6.125" hole, From 12,459' to 12,525',25 to 30K
wob, 250 gpm @ 1920 psi on bottom, 1,630 psi off bottom, 100
rpm, torque on bottom = 7K, torque off bottom = 5K. Returns
have been increasing to 20% on flow meter. Currently lossing
288 bph. At 12,500' ROP slowed to 20 to 30 fph. Bottoms up
sample from 12,500' indicated that we had drilled into the
Shublik.
02:30 - 03:00 0.50 DRILL P PROD1 Stop drilling, rotate and reciprocate pipe, waiting on decision
from Geologist.
03:00 - 09:00 6.00 DRILL P PROD1 Directional drill 6.125" hole, From 12,525' to 12,747',25 to 30K
wOb, 250 gpm @ 1920 psi on bottom, 1,630 psi off bottom, Up
weight = 210k, down weight = 155k, rotating weight = 177k,
Started dropping angle from 92.5 deg to 88.5 deg at 12,525'
slid to 12,550' to try and get back into the sand, at 12,550 Rop
increased to 100+ fph, logs confirmed that we were back in
sand.
09:00 - 11 :00 2.00 DRILL P PROD1 Monitor well, POH to 10,737' (no hole problems pulling out)
11 :00 - 12:00 1.00 DRILL P PROD1 Slip and cut drilling line, adjust brakes.
Losses for last 12 hrs. = 934 bbls
12:00 - 12:30 0.50 DRILL P PROD1 Service Rig and Topdrive,while monitoring losses.
12:30 - 14:00 1.50 DRILL P PROD1 RIH to 11,480', roll test MWD to confirm tool integrity, RIH to
12,650' wash from 12,650' to 12,747' (no problems on trip in)
Printed: 7/13/2004 9:13:52 AM
-
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6125/2004 14:00 - 17:30 3.50 DRILL P PROD1 Directional drill 6.125" hole, From 12,747' to 12,937', 25 to 30K
wob, 250 gpm @ 1,700 psi on bottom, 1,400 psi off bottom, Up
weight = 21 Ok, down weight = 155k, rotating weight = 175k.
Continue lossing between 280 - 320 bph. stopped mix LCM it
did not seem to make any differance in the loss rate. At 12,939'
it is evident that we are back in the Shublik drilling ahead @ 94
deg. Decision was made to Pull back and open hole sidetrack
@ 12,600' +/-
ART = 1.77
17:30 - 18:00 0.50 DRILL P PROD1 POH to 12,581' for open hole sidetrack.
18:00 - 00:00 6.00 STKOH N DPRB PROD1 Trenching from 12,581' to 12,607' for 1 hr.with a 180 deg
toolface. Time drill from 12,607' to 12,622' 250 gpm 1300 psi.
AIM indicated the well was sidetracked at 12,607'. Continue
lossing 285 to 320 bph.
AST = 2.7 Total losses for last 12 hrs. = 2,755 bbls
6/26/2004 00:00 - 05:30 5.50 DRILL N DPRB PROD1 Directional drill 6.125" hole, From 12,622" to 12,937', the plan
is to drop to 8,940' tvd by 12,900' then maintain 90 deg.
Currently running 15 to 20K wob, 250 gpm @ 1,580 psi on
bottom, 1,350 psi off bottom, 100 rpm, torque on bottom = 7K,
torque off bottom = 5K. Up weight = 200k, down weight = 150k,
string weight = 175k Lossing 280 bph.
05:30 - 12:00 6.50 DRILL P PROD1 Directional drill 6.125" hole, From 12,937' to 13,376', Currently
running 15 to 20K wob, 250 gpm @ 1,580 psi on bottom, 1,350
psi off bottom, 100 rpm, torque on bottom = 9K, torque off
bottom = 7K. Up weight = 220k, down weight = 160k, string
weight = 180k Lossing 280 to 320 bph. Total losses for last 12
hrs. = 3,800 bbls
ART = 3.52 AST = 2.9
12:00 - 22:30 10.50 DRILL P PROD1 Directional drill 6.125" hole, From 13,376' at 13,462' Lost fluid
level on the back side, put both pumps on back side to
establish loss rate lossing 510 bph when filling from the top.
Continue drilling ahead From 13,462' pumping down drill string
103 spm with # 1 pump, #2 pump lined up on secondary kill
line pumping 118 spm to keep back side full, lossing 760 bph
no returns. While making connections continue running #2
pump at 118 spm also using hole fill to keep back side topped
off. 25K wob, 250 gpm @ 1,550 psi on bottom, 1,250 psi off
bottom, 100 rpm, torque on bottom = 9K, torque off bottom =
5K. Up weight = 225k, down weight = 155k, string weight =
185k
Drilled to TD @ 13,859' Rop and logging data indicates we are
in the Shublik.
ART =3.51 AST =2.58
22:30 - 00:00 1.50 DRILL P PROD1 POH, back reaming out from 13,859' to 12,842' with 250 gpm
1200 psi. rotating 100 rpm rotary torque = 4,500
no problems, coninue filling back side with # 2 pump at 118
spm and hole fill pump.
Total losses for past 12 hrs. = 8,948 bbls
6/27/2004 00:00 - 01 :00 1.00 DRILL P PROD1 Held PTSM, Continue back reaming out from 12,842' to
12,555", Ream back through sidetrack point at 12,607' with 50
rpm, pumping 250 gpm with 1,100 psi. no problem. RIH from
12,650 to 13,804' (no hole problems) Make up topdrive and
wash and ream from 13,804' to 13,859' no fill on bottom.
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6/27/2004 01 :00 - 09:30 8.50 DRILL P PROD1 POH, back reaming out from 13,859' to 11,150' with 250 gpm
1200 psi. rotating 100 rpm rotary torque = 4,500
no problems, coninue filling back side with # 2 pump at 118
spm and hole fill pump. From 11,150' stop rotating and pump
BHA through high dogleg area to the shoe at 10,797'. continue
pumping out to 3,307'
09:30 - 10:00 0.50 DRILL P PROD1 Position circulating sub in liner tie back, drop ball and open cir
sub, pump 50 bbl high vis sweep, to clean up tie back area,
rotating drill string 60 rpm. pumping 270 gpm with 200 psi
10:00 - 11 :30 1.50 DRILL P PROD1 POH from 3,307' to BHA without pumping, keeping back side
full pumping 118 spm with # 2 pump and running hole fill pump
across the top
11 :30 - 12:00 0.50 DRILL P PROD1 Once at the BHA, hole began taking more fluid, lined up both
pumps on back side, hole taking 850 bph.
Total losses for the last 12 hrs. = 9,100 bbls
12:00 - 13:00 1.00 DRILL P PROD1 Held PTSM, Lay down BHA as-per Directional driller clear floor
13:00 - 14:00 1.00 CASE P RUNPRD Rig up casing equipment, PJSM with Co. Rep and Toolpusher.
14:00 - 19:00 5.00 CASE P RUNPRD Run 140 Joints 4.5" 12.6# L-80 IBT-M casing as- per running
order, make up HMCV and Liner top packer. Pickup weight =
105k Down weight = 90k. rig down casing equipment & rig up
DP handling equipment.
19:00 - 00:00 5.00 CASE P RUNPRD RIH with 4.5" 12.6# L-80 Liner on 4" DP to 10,797' filling every
10 stds. hole taking 430 bph.
Total losses for last 12 hrs = 8,320 bbls.
6/28/2004 00:00 - 04:00 4.00 CASE P RUNPRD Held PTSM, Makeup Baker cement head on single of DP and
lay on skate. RIH with 4.5" 12.6# L-80 IBT-M liner on 4" DP
filling every 10 stds. Sat down at 12,340' work pipe several
times to get through with no luck, makeup topdrive fill pipe,
pumping 200 gpm with 120 psi. got past tight spot after working
string serveral more times. Tight at 12,558' attempt to work
through without pumping, no luck. Began pump at 200 gpm
with 120 psi work pipe up 45' several times with pump, then fell
through. Took weight at 12,906' work pipe several times
without pump, setting down in the same place no indication of
any progress. Madeup topdrive began pumpimg at 200 spm
with 110 psi. work string down with 5k set on bottom pressure
started increasing gainning 200 to 300 psi. work several more
times with same results.
04:00 - 04:30 0.50 CASE P RUNPRD POH with 4.5" liner from 12,906' to 12,580'
04:30 - 06:00 1.50 CASE P RUNPRD Work pipe through sidetrack area from 12,580' to 12,607'
06:00 - 07:00 1.00 CASE P RUNPRD RIH with 4.5" 12.6# L-80 IBT-M liner on 4" DP from 12,607' to
12,906', unable to work past obstruction at 12,906'
07:00 - 08:30 1.50 CASE N DPRB RUNPRD POH with 4.5" Liner to 10,797', lay down cement head.
08:30 - 09:00 0.50 CASE N DPRB RUNPRD Pump 100 bbl. Calcium Carbinate pill, 100 ppb calcium Carbo 2
ppb Duo-vis. down DP. at 270 gpm with 120 psi. in an attempt
to slow losses. Losing 500-700 bph.
09:00 - 12:00 3.00 CASE N DPRB RUNPRD POH from 10,797' to 5,850', Monitor welllossing 500 bph.
Losses for last 12 hrs = 5,900 bbls.
12:00 - 13:00 1.00 CASE N DPRB RUNPRD Held PTSM, Pump 50 bbl. Calcium Carbinate pill, 100 ppb
calcium Carbo 2 ppb Duo-vis. down DP. at 290 gpm with 100
psi. Rig up casing equipment. Monitor welllossing 600 bph.
13:00 - 20:00 7.00 CASE N DPRB RUNPRD POH Lay down 4.5" 12.6# L-80 liner to 2,082' losses began
increasing with liner out of the 7" (750 to 800 bph) pump 100
Printed: 7/13/2004 9:13:52 AM
e
e
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6128/2004 13:00 - 20:00 7.00 CASE N DPRB RUNPRD bbl Calcium carbinate pill down backside. continue laying down
liner, break out float equimpent, (nose on float shoe gone)
20:00 - 20:30 0.50 CASE N DPRB RUNPRD Rig down casing equipment and clear floor.
20:30 - 22:00 1.50 CASE N DPRB RUNPRD Pickup BHA as-per directional driller, orient MWD and motor,
shallow test MWD.
22:00 - 00:00 2.00 CASE N DPRB RUNPRD RIH with Clean out assembly to 6,997' Fill DP at 4,050' (hole
taking 500 bph.)
Losses for last 12 hrs = 9,240 bbls
6/29/2004 00:00 - 01 :30 1.50 CASE N DPRB RUNPRD Held PTSM, Slip and cut drilling line, Service topdrive.
01 :30 - 03:00 1.50 CASE N DPRB RUNPRD RIH with clean out assembly, from 6,997' to 11,350', hole
taking 500 bph while tripping in the hole.
03:00 - 03:30 0.50 CASE N DPRB RUNPRD Roll test MWD at 11,350' Survey matched original surveys.
(Lossing 345 bph.)
03:30 - 07:00 3.50 CASE N DPRB RUNPRD RIH from 11,350' to 11,850' , check shot survey at 11,850'
Survey was 11 deg out. Continue RIH tight at 12,263' attempt
to work through without pumping, no go, make up topdrive,
pumping at 80 spm and 50 rpm, worked through and
backream. Once above this spot shut down pumps and
rotary, work back down and did not see anything. RIH to 12,330'
took weight, madeup topdrive and ream from 12,330 to 12,363'
back reamed two times, saw nothing going back through.
Check shot survey at 12,350', Survey was 4 deg. out. RIH work
tight area from 12,520' to 12,570' 105 spm with 1300 psi. 100
rpm, torque = 9 to 12k, RIH to 12,620' check shot survey
indicates, we are in the right hole.
07:00 - 12:30 5.50 CASE N DPRB RUNPRD Trench sidetrack area from 12,560' to 12,620' pumping 260
gpm with 1,320 psi. with a 180 deg TF for 2 hrs. Pump 4, 50
bbl viscosified lube pills down back side to aid in trenching. RIH
to 12,736' Bit depth, work bottom stabilizer through trenched
area for 2 hrs. pumping 260 gpm @ 1300 psi. 100 rpm, Initial
torque was 10k, once Lube pills reached BHA torque dropped
to 5k. Up weight = 225k, down weight = 160k, string weight
=175k. Lossing 740 bph while pumping down DP, and 340
when filling from backside.
Losses for the last 12 hrs. = 7,000 bbls.
12:30 - 15:00 2.50 CASE N DPRB RUNPRD RIH, from 12,705', (no tight hole at 12,906' where liner stacked
up) Ream tight spots at 13,180' and 13,380', Ream from
13,430' to bottom as a precaution, due to the under gauge bit.
15:00 - 15:30 0.50 CASE N DPRB RUNPRD Pump 50 bbls viscosified lube pill down DP.
15:30 - 20:00 4.50 CASE N DPRB RUNPRD Back ream out from 13,859' tight at 13,839' stalling topdrive,
torque = 17k. got through, pumping 250 gpm @ 1300 psi, 100
rpm, continued back reaming to 12,393'
20:00 - 21 :00 1.00 CASE N DPRB RUNPRD Survey at 12,393' unable to get MWD to turn on.
21 :00 - 00:00 3.00 CASE N DPRB RUNPRD POH back reaming from 12,393' to 11,150' pull through high
dogleg area from 11,150' to 10,797' continue pulling out to
8,145'. Lossing 290 bph.
Total losses for last 12 hrs. = 6,985 bbls.
6/30/2004 00:00 - 02:45 2.75 CASE N DPRB RUNPRD Held PTSM, POH from 8,145' to BHA monitor well 500 bph
loss, (pumped 100 bbl CAC03 pill down backside @ 3,307' to
slow losses)
02:45 - 03:30 0.75 CASE N DPRB RUNPRD Lay down BHA Clear floor. While laying down BHA Losses
increased to 830 bph.
03:30 - 10:00 6.50 CASE N DPRB RUNPRD Rig up casing tools. PJSM with Co. Rep and Toolpusher.
Printed: 7/13/2004 9:13:52 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
6/30/2004 03:30 - 10:00 6.50 CASE N DPRB RUNPRD Makeup 4.5" 12.6# L-80 IBT-M shoe and float joints, backer
lock first two connections. and RIH with liner as-per running
order. Make up Baker ZXP liner top packer. Losses slowed to
565 bph.
10:00 - 10:30 0.50 CASE N DPRB RUNPRD Rig down casing tools,clear floor Rig up DP handling
equipment.
10:30 - 12:00 1.50 CASE N DPRB RUNPRD RIH with 4.5" 12.6# L-80 Liner on 4" DP to 8,720' filling as
required.
Total losses for last 12 hrs. = 7,000 bbls.
12:00 - 16:00 4.00 CASE N DPRB RUNPRD Held PTSM, RIH with liner from 8,720' to 10,797'. Make up
cement head on joint of DP, lay on skate.
16:00 - 17:00 1.00 CASE P RUNPRD RIH with Liner from 10,797' set down at 12,542' made up
topdrive fill pipe, pumping 250 gpm with 220 psi. work through
tight spot, Continue RIH to 13,859'
17:00 - 17:30 0.50 CEMT P RUNPRD Pump the capacity of DP and liner 260 gpm @ 530 psi. Held
PJSM with Co. Rep and Toolpusher.
Up weight =215k
Down weight = 135k
17:30 - 19:00 1.50 CEMT P RUNPRD Pump 5 bbls of water test lines to 3,500 psi, pump 15 bbls of
15.8 ppg class G cement, wash up lines down riser, drop DP
dart and displace with rig pumps at 6.5 bpm. latched up liner
wiper plug with calculated strokes, bumped plug with 1,300 psi
to set liner hanger. hold pressure apply 70k down to set
hanger, bleed off pressure and check floats. rotate string 15
turns to the right, apply 500 psi to DP, picked up until pressure
bled off to exposing rotaing dog sub, rotate string at 15 rpm
torque 2000 ftllbs. slack off 70k to set ZXP packer repeat twice
to ensure set. Fill hole on back side monitor well hole static.
CIP @ 18:30
19:00 - 20:00 1.00 CEMT P RUNPRD Rig down high pressure lines, lay down cement head
T otallosses until packer set = 4,197 bbls
20:00 - 00:00 4.00 CEMT P RUNPRD POH with running tool to 5,931' lay down 186 joints 4" DP.
7/1/2004 00:00 - 01 :30 1.50 CEMT C RUNPRD Held PTSM, Continue laying down 4" DP
01 :30 - 02:00 0.50 CEMT C RUNPRD Break running tool below rotating dog sub and lay down.
Pickup cement head, break cross over, clean floor
02:00 - 03:00 1.00 CEMT C RUNPRD Make up HMCV shifting tool assembly.
03:00 - 06:00 3.00 CEMT C RUNPRD RIH with HMCV shifting tool. To 7954'
06:00 - 07:00 1.00 CEMT C RUNPRD Circulate one DP volume 80 bbls, @ 3 bpm. with 150 psi.
Change out short bails.
07:00 - 07:45 0.75 CEMT C RUNPRD RIH from 7,954', locate rotating dog sub on top of liner tie back
@ 8,011'
07:45 - 08:00 0.25 CEMT C RUNPRD Held PJSM, Pressure up to rupture disk @ 1,600 psi, perform
injectivity test, 3bpm. @ 170 psi, 5 bpm @ 550 psi. pumped a
total of 10 bbls.
08:00 - 09:45 1.75 CEMT C RUNPRD Pump 5 bbls water and test lines to 3,500 psi. Pump 275 bbls
15.8 ppg class G cement, 5 bpm with 1,600 psi max. final rate
5 bpm. @ 900 psi. Displace with 5 bbl of water, followed by 73
bbls diesel, at 5 bpm @ 260 psi under displace by 2 bbls.
Pickup to shift HMCV closed, pressure up to 1,000 psi to
ensure HMCV is closed. CIP at 09:21
09:45 - 10:45 1.00 CEMT C RUNPRD Pickup 5', close annular and reverse circulate Diesel and
cement from DP. got back 1 bbl of cement
10:45 - 12:00 1.25 CEMT C RUNPRD Rig down circulating lines and head, stand back one stand,
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
7/1/2004 10:45 - 12:00 1.25 CEMT C RUNPRD Change out long bails
12:00 - 13:00 1.00 CEMT C RUNPRD Held PTSM, Circulate bottoms up 1.5 times ,210 gpm @ 440
psi.
13:00 - 17:30 4.50 CEMT C RUNPRD POH, lay down HMCV shifting tool. (Test choke monifold to
250 psi low and 3,500 psi high, while coming out of the hole.
17:30 - 18:00 0.50 BOPSURC RUNPRD Pull wear ring
18:00 - 21 :30 3.50 BOPSUF C RUNPRD Rig up BOP test equipment and test BOPS, 250 psi low, 3,500
psi high, as per Nabors testing procedure. Witness of the BOP
test was waived by John Spaulding with AOGCC.
21 :30 - 22:30 1.00 BOPSUF C RUNPRD Change top rams to 2 7/8"
22:30 - 23:00 0.50 BOPSUF C RUNPRD Test door seals to 3,500 psi
23:00 - 23:30 0.50 BOPSUF C RUNPRD Rig down test equipment, pull test plug and install wear ring.
23:30 - 00:00 0.50 CLEAN C CLEAN Rig up power tongs and 2 7/8" handling equipment.
7/2/2004 00:00 - 10:00 10.00 CLEAN P CLEAN Held PTSM, Make up 3 3/4" flat bottom Mill, and RIH picking
up 187 joints of 2 7/8" PAC DP.
10:00 - 10:30 0.50 CLEAN P CLEAN Rig down power tongs and 2 7/8' handling equipment, rig up 4"
handling equpment.
10:30 - 12:00 1.50 CLEAN P CLEAN RIH to 10,571' with 3 3/4" clean out assembly.
12:00 - 13:30 1.50 CLEAN P CLEAN Held PTSM, RIH from 10,571' to 13,440', sat down at 13,440'
13:30 - 16:15 2.75 CLEAN P CLEAN Ream from 13,440' to 13,768', 3-4K wob, 60 rpm, torque 3-4K,
3.5 bpm, @ 1,800 psi
16:15 - 18:30 2.25 CLEAN P CLEAN Pump 25 bbl high vis sweep, and displace well to 8.4 ppg
seawater, 4.5 bpm @ 3,200 psi.
18:30 - 19:30 1.00 CLEAN P CLEAN Rig up test equipment, and test liner lap and casing to 3,500
psi for 30 min. and record on chart. Rig down test equipment.
19:30 - 20:30 1.00 CLEAN P CLEAN Spot 50 bbl high vis perf pill in 4.5" liner from 13,768 to 10,475',
pump dry job.
20:30 - 23:30 3.00 CLEAN P CLEAN POH with 3 3/4" clean out assembly from 13,768' to 5,780'
23:30 - 00:00 0.50 CLEAN P CLEAN Rig Up power tongs and 27/8" handling equipment.
7/3/2004 00:00 - 04:00 4.00 CLEAN P CLEAN Held PTSM, POH lay down 46 joints of 2 7/8" DP, stand back
46 stands.
04:00 - 04:30 0.50 CLEAN P CLEAN Lay down Clean out assembly. Clean floor
04:30 - 07:30 3.00 PERFUB P LOWER1 Rig Up Schlumberger tools, PJSM with Co Rep, Toolpusher,
Schlumberger, and rig crew. P/U Perforating guns.
07:30 - 11 :30 4.00 PERFUB P LOWER1 RIH with Perf assembly on 2 7/8" DP to 5,798', rig down power
tongs and 2 7/8" handling equipment
11 :30 - 14:30 3.00 PERFUB P LOWER1 RIH from 5,798' tag landing collar @ 13,768', POH to 13,091'
to locate top shot @ 12,170'
14:30 - 15:30 1.00 PERFUB P LOWER1 Held PJSM, Rig up to reverse circulate, fill lines close annular
pressure up to 2,500 psi. hold pressure for 2 min. to fire guns,
bleed off pressure open annular, guns fired after 9 min.
Perforated interval from 13,090' to 12,170' with 4 shots per foot
at 180 deg phasing using 2.88" guns with Power Jet 2906
charges. Hole taking fluid.
15:30 - 16:00 0.50 PERFUB P LOWER1 POH from 13,091' to 12,117' to get bottom of perf assembly
above the top perf @ 12,170;
16:00 - 21 :30 5.50 PERFUB P LOWER1 Monitor well, hole taking between 200 - 240 bph. Mix up 100
bbls High Vis pill, 600+ viscosity.
21 :30 - 23:00 1.50 PERFUB P LOWER1 Pump 100 bbl pill down back side @ 3 bpm, allowing pill to fall
to loss zone.
23:00 - 00:00 1.00 PERFUB P LOWER1 Monitor well, With pill spotted at the top perf, losses decreased
from 220 bph to 125 bph. Then steadily increased back to the
original 220 to 240 bph.
Printed: 7/13/2004 9:13:52 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
7/3/2004 23:00 - 00:00 1.00 PERFUB P LOWER1 Losses since perforated = 1,445 bbls.
7/4/2004 00:00 - 05:00 5.00 PERFUB P LOWER1 Held PTSM, POH from 12,117' to 8,000, With perforating
assembly pulled out of the 4.5" liner, losses went from 240 bph
to 372 bph. Continue to POH, to 4855' Rig up power tongs and
27/8" handling equipment, stand back 52 stands of 2 7/8" DP.
Loss rate continues to increase fom 372 bph to 450 bph.
05:00 - 10:00 5.00 PERFUB P LOWER1 Held PJSM, Lay down Schlumberger perforating guns. Clear
floor of all perforating tools and equipment.
10:00 - 12:00 2.00 PERFUB P LOWER1 RIH with 2 7/8" DP open ended. Total losses for past 12 hrs =
5,031 bbls
12:00 - 13:00 1.00 PERFUB P LOWER1 Held PTSM, RIH with 2 7/8" DP to 4,830' makeup XO and float
sub, rig down power tongs and handling equipment
13:00 - 15:30 2.50 PERFUB P LOWER1 RIH to 12,165'
15:30 - 20:00 4.50 PERFUB P LOWER1 Monitor well for losses,filling hole on the back side, lossing 200
to 230 bph. Pump 50 bbl saturated salt spacer, followed by 100
bbl high vis sized salt pill followed with 50 bbl saturated salt
spacer. Monitor losses, lossing 160 to 180 bph initialy, rate
slowly increased to 200+ bph.
20:00 - 21 :00 1.00 PERFUB P LOWER1 POH 2 stands to 12,007' Slip and cut drilling line.
21 :00 - 23:30 2.50 PERFUB P LOWER1 POH to 4,830' lay down XO and float sub. With 2 7/8" DP
pulled out of the 4 1/2" liner, losses increased to 400 bph.
23:30 - 00:00 0.50 PERFUB P LOWER1 Rig up power tongs and 2 7/8" handling equipment Total
losses for the last 12 hrs = 3,791 bbls.
7/5/2004 00:00 - 03:00 3.00 PERFUB P LOWER1 Held PTSM, Stand back 46 stands of 2 7/8" DP, lay down 21
joints 2 7/8" DP. By 4,176' losses had increased to 600 bph.
Once out of the hole losses decreased to 450 to 500 bph
03:00 - 03:30 0.50 PERFUB P LOWER1 Clean floor, monitor well continue lossing at 450 bph.
03:30 - 09:00 5.50 PERFUB P LOWER1 Make up 4.5" EZSV bridge plug and RIH to 12,154.'
09:00 - 10:00 1.00 PERFUB P LOWER1 Set EZSV, at 12,154' and test to 1,000 psi held for 10 min. bled
off pressure. Blow down topdrive and kill line. Losses from
midnight to 09:30 = 4,250 bbls.
10:00 - 16:00 6.00 PERFUB P LOWER1 POH, lay down 4" DP
16:00 - 20:30 4.50 PERFUB P LOWER1 Rig up power tongs and 2 7/8" handling equipment, lay down
135 joints 2 7/8" DP and EZSV running tool.
20:30 - 22:30 2.00 BOPSUPP RUNCMP Pull wear ring and install test plug. Change top rams from 2
7/8" to 3.5 x6 variables.Test door seals to 3,500 psi.
22:30 - 23:00 0.50 RUNCOMP RUNCMP Pickup 1 joint 4" DP makeup XO's and tubing hanger, make
dummy run with hanger.
23:00 - 00:00 1.00 RUNCOMP RUNCMP Rig up tubing handling equipment.
7/6/2004 00:00 - 12:00 12.00 RUNCOMP RUNCMP Held PJSM. Make up and run 4.5" Completion Tail Assy, 'X'
Nipple Assy and Baker S-3 Packer Assy. Bakerloc all
connections below Packer. Continue running 4.5" 12.6# 13CR
VAM-TOP Tubing as per Program. Torque to 4,400 ft/lbs. Total
of 185 joints run.
12:00 - 13:15 1.25 RUNCOMP RUNCMP Tag up on bottom of 41/2" Liner Top tie back sleeve. Space
out, pick up 3 pup joints and install in string one joint down.
Drain fluid from BOP. Install tubing hanger and land string with
WLEG 3' inside tieback sleeve at 8017'. Run in lock down
screws.
13:15 - 15:15 2.00 RUNCOMP RUNCMP Rig up to reverse circulate. Reverse circulate 147 bbls.
corrosion inhibited seawater and displace.
15:15 - 17:30 2.25 RUNCOMP RUNCMP Drop ball/rod assy. Pressure up tubing to 3500psi to set S-3
Packer. Hold 3500 psi for 30 minute tubing test. Bleed tubing to
Printed: 711312004 9: 13:52 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
A-30
A-30
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 7ES
Start: 5/26/2004
Rig Release: 7/7/2004
Rig Number:
Spud Date: 6/6/1985
End: 7/7/2004
716/2004 15:15 - 17:30 2.25 RUNCOMP RUNCMP 2000 psi & pressure annulus to 3500 psi. Hold for 30 minute
packer test. Sleed annulus then tubing to '0'. Pressure annulus
to 2500 psi to shear DCK valve. Pump through both ways to
confirm complete shear.
17:30 - 17:45 0.25 SOPSUP P WHDTRE Set TWC and test from below to 1000 psi.
17:45 - 19:30 1.75 SOPSU¡::P RUNCMP N/D SOPE.
19:30 - 22:30 3.00 WHSUR P RUNCMP N/U adapter flange & tree. Test both to 5000 psi - OK.
22:30 - 23:30 1.00 WHSUR P RUNCMP R/U DSM lubricator. Pull TWC. RID DSM.
23:30 - 00:00 0.50 WHSUR P RUNCMP R/U lines to circulate diesel for freeze protection.
7/7/2004 00:00 - 00:30 0.50 WHSUR P WHDTRE Complete rig up Little Red hot oil unit for freeze protect. PJSM
with all personnel involved.
00:30 - 02:30 2.00 WHSUR P WHDTRE Pump 151 bbl Diesel down annulus taking seawater returns
through tubing. Allow to U-Tube for freeze protection in tubing
and annulus to 2200'.
02:30 - 03:30 1.00 WHSUR P WHDTRE Set SPV with DSM lubricator. Test from below to 1000 psi.
03:30 - 06:00 2.50 DEMOS P POST Rig down Little Red hot oil unit. Remove secondary annulus
valve. Dress Tree. Complete cleaning pits. Suck out cellar.
Secure Well. RELEASE RIG @ 06:00 HRS 7/7/2004.
Printed: 7/13/2004 9:13:52 AM
I.
A-30A Survey Report r r
Report Date: 27 -Jun-04 Survey I DLS Computation Method: Minimum Curvature I Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 139.750'
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure I Slot: A-PAD I A-30 TVD Reference Datum: Rotary Table
Well: A-30 TVD Reference Elevation: 80.07 ft relative to MSL
Borehole: A·30A Sea Bed I Ground Level Elevation: 51.37 ft relative to MSL
UWUAPI#: 500292137201 Magnetic Declination: 25.130'
Survey Name I Date: A-30A I June 27, 2004 Total Field Strength: 57591.644 nT
Tort I AHD I DDII ERD ratio: 385.564' 18428.22 ft 16.7011 0.944 Magnetic Dip: 80.835'
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: July 27, 2004
Location Let/Long: N 70.26282668, W 148.75173554 Magnetic Declination Model: BGGM 2003
Location Grid NIE YIX: N 5947264.980 ftUS, E 654397.990 ftUS North Reference: True North e
Grid Convergence Angle: + 1.17495222' Total Corr Mag North -> True North: +25.130'
Grid Scale Factor: 0.99992708 Local Coordinates Referenced To: Well Head
I Comments Measured I Inclination I Azimuth I Su~u TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude Survey Tool
Depth Section Departure Model
(II) (dog) (dog) (II) (II) (II) (II) (II) (II) (degl100ll) (dogl100ll) (dogI1001l) (IIUS) (IIUS)
Projected-Up 0.00 0.00 199.60 -80.07 0.00 0.21 0.00 -0.39 -0.14 0.00 0.00 0.00 5947264.59 654397.86 N 70.26282563 W 148.75173666
99.17 0.47 199.60 19.10 99.17 0.41 0.41 -0.77 -0.28 0.47 0.47 0.00 5947264.20 654397.73 N 70.26282457 W 148.75173777 BP _BOSS_GYRO
199.17 0.45 222.00 119.09 199.16 0.67 1.20 -1.45 -0.68 0.18 -0.02 22.40 5947263.52 654397.34 N 70.26282272 W 148.75174100 BP _BOSS_GYRO
299.17 0.47 205.19 219.09 299.16 0.89 2.00 -2.11 -1.11 0.14 0.02 -16.81 5947262.84 654396.92 N 70.26282091 W 148.75174454 BP _BOSS_GYRO
399.17 0.80 209.10 319.09 399.16 1.31 3.11 -3.10 -1.63 0.33 0.33 3.91 5947261 .85 654396.43 N 70.26281823 W 148.75174870 BP _BOSS_GYRO
499.17 0.55 195.50 419.08 499.15 1.83 4.28 -4.17 -2.09 0.30 -0.25 -13.60 5947260.77 654395.98 N 70.26281530 W 148.75175248 BP _BOSS_GYRO
599.17 0.55 215.00 519.07 599.14 2.22 5.23 -5.02 -2.50 0.19 0.00 19.50 5947259.91 654395.60 N 70.26281296 W 148.75175574 BP _BOSS_GYRO
699.17 0.50 212.50 619.07 699.14 2.47 6.15 -5.78 -3.01 0.05 -0.05 -2.50 5947259.14 654395.10 N 70.26281088 W 148.75175986 BP _BOSS_GYRO
799.17 0.45 191.19 719.07 799.14 2.85 6.97 -6.54 -3.32 0.18 -0.05 -21.31 5947258.38 654394.81 N 70.26280882 W 148.75176237 BP _BOSS_GYRO
899.17 0.25 186.50 819.06 899.13 3.24 7.58 -7.14 -3.42 0.20 -0.20 -4.69 5947257.77 654394.72 N 70.26280718 W 148.75176319 BP _BOSS_GYRO
999.17 0.25 263.80 919.06 999.13 3.27 7.95 -7.38 -3.66 0.31 0.00 77.30 5947257.53 654394.48 N 70.26280652 W 148.75176514 BP _BOSS_GYRO
1099.17 0.37 232.50 1019.06 1099.13 3.13 8.48 -7.60 -4.13 0.20 0.12 -31.30 5947257.30 654394.01 N 70.26280592 W 148.75176896 BP _BOSS_GYRO
1199.17 0.50 212.69 1119.06 1199.13 3.24 9.23 -8.16 -4.63 0.20 0.13 -19.81 5947256.72 654393.53 N 70.26280438 W 148.75177294 BP _BOSS_GYRO
1299.17 0.40 202.39 1219.06 1299.13 3.53 10.01 -8.85 -4.99 0.13 -0.10 -10.30 5947256.03 654393.18 N 70.26280249 W 148.75177592 BP _BOSS_GYRO
1399.17 0.33 226.80 1319.05 1399.12 3.71 10.64 -9.37 -5.34 0.17 -0.07 24.41 5947255.50 654392.85 N 70.26280107 W 148.75177869 BP_BOSS_.
1499.17 0.47 221.50 1419.05 1499.12 3.78 11.34 -9.88 -5.82 0.14 0.14 -5.30 5947254.99 654392.37 N 70.26279970 W 148.75178258 BP _BOSS_G
1599.17 0.55 217.19 1519.05 1599.12 3.94 12.23 -10.57 -6.38 0.09 0.08 -4.31 5947254.28 654391.83 N 70.26279781 W 148.75178712 BP _BOSS_GYRO
1699.17 0.55 209.10 1619.04 1699.11 4.22 13.19 -11.37 -6.90 0.08 0.00 -8.09 5947253.47 654391.32 N 70.26279562 W 148.75179136 BP _BOSS_GYRO
1799.17 1.38 173.11 1719.03 1799.10 5.39 14.83 -12.98 -6.99 0.99 0.83 -35.99 5947251.86 654391.26 N 70.26279121 W 148.75179208 BP _BOSS_GYRO
1899.17 3.00 163.70 1818.95 1899.02 8.79 18.64 -16.69 -6.11 1.65 1.62 -9.41 5947248.17 654392.22 N 70.26278108 W 148.75178497 BP _BOSS_GYRO
1999.17 5.30 160.61 1918.68 1998.75 15.50 25.87 -23.56 -3.85 2.31 2.30 -3.09 5947241.35 654394.63 N 70.26276232 W 148.75176664 BP _BOSS_GYRO
2099.17 8.00 . 156.11 2018.00 2098.07 26.49 37.45 -34.28 0.51 2.75 2.70 -4.50 5947230.72 654399.20 N 70.26273303 W 148.75173146 BP _BOSS_GYRO
2199.17 10.00 152.11 2116.77 2196.84 41.65 53.08 -48.32 7.39 2.09 2.00 -4.00 5947216.83 654406.36 N 70.26269468 W 148.75167584 BP _BOSS_GYRO
2299.17 13.18 148.20 2214.72 2294.79 61.41 73.17 -65.69 17.46 3.27 3.18 -3.91 5947199.67 654416.79 N 70.26264723 W 148.75159443 BP _BOSS_GYRO
2399.17 17.68 147.81 2311.09 2391.16 87.74 99.76 -88.24 31.56 4.50 4.50 -0.39 5947177.41 654431.35 N 70.26258562 W 148.75148042 BP _BOSS_GYRO
2499.17 19.57 148.61 2405.85 2485.92 119.33 131.70 -115.39 48.38 1.91 1.89 0.80 5947150.62 654448.72 N 70.26251145 W 148.75134450 BP_BOSS_GYRO
2599.17 20.82 151.40 2499.70 2579.77 153.28 166.21 -145.29 65.61 1.58 1.25 2.79 5947121.08 654466.56 N 70.26242975 W 148.75120522 BP _BOSS_GYRO
2699.17 21.22 152.31 2593.05 2673.12 188.35 202.08 -176.92 82.53 0.52 0.40 0.91 5947089.80 654484.12 N 70.26234335 W 148.75106848 BP _BOSS_GYRO
2799.17 21.60 152.11 2686.14 2766.21 224.00 238.59 -209.21 99.54 0.39 0.38 -0.20 5947057.87 654501 .80 N 70.26225512 W 148.75093091 BP _BOSS_GYRO
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-301A-30AIA-30A
Generated 8/5/2004 2:37 PM Page 1 of 6
Comments Measured I Inclination I Azimuth Isu~TVDI TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude Survey Tool
Depth Section Departure Model
(II) (deg) (deg) (II) (II) (II) (II) (II) (II) (degl100ll) (degl1001l) (degl100ll) (IIUS) (IIUS)
2899.17 22.55 150.81 2778.81 2858.88 260.80 276.17 -242.22 117.51 1.07 0.95 -1.30 5947025.24 654520.43 N 70.26216495 W 148.75078572 BP _BOSS_GYRO
2999.17 24.12 149.70 2870.63 2950.70 299.74 315.78 -276.60 137.17 1.63 1.57 -1.11 5946991 .27 654540.79 N 70.26207101 W 148.75062680 BP _BOSS_GYRO
3099.17 25.82 150.31 2961 .28 3041 .35 341.28 357.99 -313.17 158.27 1.72 1.70 0.61 5946955.15 654562.63 N 70.26197113 W 148.75045628 BP _BOSS_GYRO
3199.17 27.83 149.40 3050.52 3130.59 385.70 403.11 -352.18 180.94 2.05 2.01 -0.91 5946916.61 654586.10 N 70.26186454 W 148.75027303 BP _BOSS_GYRO
3299.17 31.20 145.00 3137.54 3217.61 434.53 452.35 -393.51 207.69 4.00 3.37 -4.40 5946875.84 654613.69 N 70.26175164 W 148.75005682 BP _BOSS_GYRO
3399.17 33.07 144.81 3222.21 3302.28 487.50 505.54 -437.03 238.27 1.87 1.87 -0.19 5946832.96 654645.15 N 70.26163275 W 148.74980964 BP _BOSS_GYRO
Tie-In Survey 3399.19 33.07 144.81 3222.23 3302.30 487.51 505.55 -437.03 238.27 0.00 0.00 0.00 5946832.96 654645.16 N 70.26163272 W 148.74980959 BP_BOSS_GYRO
Top Window 3446.00 34.28 144.91 3261.18 3341.25 513.36 531.51 -458.26 253.21 2.59 2.58 0.21 5946812.04 654660.53 N 70.26157474 W 148.74968885 BP _BLIND
Base Window 3462.00 35.77 147.02 3274.29 3354.36 522.49 540.69 -465.87 258.35 12.00 9.31 13.19 5946804.54 654665.82 N 70.26155395 W 148.74964733 BP _BLIND
Blind survey 3474.00 35.77 147.02 3284.02 3364.09 529.45 547.70 -471.75 262.17 0.00 0.00 0.00 5946798.74 654669.76 N70.26153787 W 148.74961647 BP_BLlND
First MWD+IFR+MS 3527.08 38.45 149.64 3326.35 3406.42 561.10 579.72 -499.01 278.96 5.86 5.05 4.94 5946771.83 654687.10 N 70.26146339 W 148.74948077 BP _MWD+IFR+MS
3621.83 43.30 159.69 3398.05 3478.12 620.77 641.62 -555.00 305.17 8.61 5.12 10.61 5946716.40 654714.45 N 70.26131044 W 148.74926892 BP_MWD.S
3718.63 43.67 163.56 3468.30 3548.37 682.56 708.22 -618.19 326.15 2.78 0.38 4.00 5946653.65 654736.73 N 70.26113780 W 148.74909934 BP MWD IS
3813.92 43.65 155.57 3537.29 3617.36 744.35 773.95 -679.74 349.08 5.79 -0.02 -8.38 5946592.59 654760.91 N 70.26096966 W 148.74891402 BP _MWD+I +MS
3910.27 43.54 153.24 3607.07 3687.14 808.62 840.38 -739.65 377.78 1.67 -0.11 -2.42 5946533.29 654790.83 N 70.26080598 W 148.74868210 BP _MWD+IFR+MS
4005.51 42.92 156.24 3676.47 3756.54 871.62 905.61 -798.63 405.62 2.25 -0.65 3.15 5946474.90 654819.87 N 70.26064486 W 148.74845712 BP _MWD+IFR+MS
4100.45 42.26 156.44 3746.37 3826.44 933.19 969.86 -857.48 431.40 0.71 -0.70 0.21 5946416.59 654846.85 N 70.26048408 W 148.74824874 BP _MWD+IFR+MS
4196.49 43.37 157.38 3816.82 3896.89 995.56 1035.13 -917.52 456.99 1.33 1.16 0.98 5946357.09 654873.67 N 70.26032004 W 148.74804192 BP _MWD+IFR+MS
4293.03 43.10 156.98 3887.15 3967.22 1058.65 1101.26 -978.47 482.64 0.40 -0.28 -0.41 5946296.68 654900.56 N 70.26015352 W 148.74783466 BP _MWD+IFR+MS
4387.20 44.06 155.31 3955.37 4035.44 1120.92 1166.17 -1037.83 508.90 1.59 1.02 ·1.77 5946237.88 654928.03 N 70.25999134 W 148.74762246 BP _MWD+IFR+MS
4483.97 43.23 156.12 4025.40 4105.47 1185.14 1232.96 -1098.71 536.37 1.03 -0.86 0.84 5946177.58 654956.74 N 70.25982502 W 148.74740046 BP _MWD+IFR+MS
4579.76 43.99 156.79 4094.76 4174.83 1248.42 1299.03 -1159.28 562.76 0.93 0.79 0.70 5946117.57 654984.36 N 70.25965954 W 148.74718720 BP _MWD+IFR+MS
4675.82 43.98 155.63 4163.87 4243.94 1312.39 1365.74 -1220.32 589.67 0.84 -0.01 -1.21 5946057.10 655012.52 N 70.25949278 W 148.74696976 BP _MWD+IFR+MS
4770.96 43.07 154.85 4232.86 4312.93 1375.53 1431.26 -1279.82 617.11 1.11 -0.96 -0.82 5945998.18 655041.16 N 70.25933023 W 148.74674805 BP _MWD+IFR+MS
4866.63 44.11 158.69 4302.16 4382.23 1438.57 1497.21 -1340.42 643.10 2.97 1.09 4.01 5945938.13 655068.39 N 70.25916467 W 148.74653806 BP _MWD+IFR+MS
4962.36 43.31 158.86 4371.36 4451 .43 1501.11 1563.36 -1402.08 667.05 0.84 -0.84 0.18 5945876.98 655093.59 N 70.25899621 W 148.74634455 BP _MWD+IFR+MS
5057.71 44.25 159.71 4440.20 4520.27 1563.28 1629.33 -1463.79 690.38 1.16 0.99 0.89 5945815.77 655118.18 N 70.25882762 W 148.74615603 BP _MWD+IFR+MS
5153.11 43.97 159.36 4508.70 4588.77 1625.76 1695.73 -1526.00 713.59 0.39 -0.29 -0.37 5945754.05 655142.67 N 70.25865766 W 148.74596845 BP _MWD+IFR+MS
5249.30 44.35 158.18 4577.71 4657.78 1689.11 1762.74 -1588.46 737.86 0.94 0.40 -1.23 5945692.1 0 655168.21 N 70.25848702 W 148.74577238 BP _MWD+IFR+MS
5344.71 43.57 155.57 4646.39 4726.46 1752.39 1828.96 -1649.36 763.86 2.07 -0.82 -2.74 5945631.75 655195.45 N 70.25832063 W 148.74556234 BP _MWD+IFR+MS
5439.95 44.88 158.55 4714.65 4794.72 1815.79 1895.38 -1710.53 789.72 2.58 1.38 3.13 5945571.13 655222.56 N 70.25815352 W 148.74535335 BP _MWD+IFR+MS
5535.36 44.55 156.22 4782.45 4862.52 1879.75 1962.51 -1772.49 815.53 1.75 -0.35 -2.44 5945509.72 655249.63 N 70.25798424 W 148.74514485 BP_MWD+I.
5631.47 43.62 156.08 4851 .49 4931.56 1943.90 2029.37 -1833.64 842.56 0.97 -0.97 -0.15 5945449.14 655277 .91 N 70.25781716 W 148.74492641 BP MWD+I
5726.11 43.66 157.91 4919.98 5000.05 2006.27 2094.68 -1893.76 868.09 1.34 0.04 1.93 5945389.56 655304.66 N 70.25765293 W 148.74472021 BP _MWD+IF + S
5822.15 44.66 160.52 4988.88 5068.95 2069.34 2161.58 -1956.30 891.81 2.16 1.04 2.72 5945327.52 655329.66 N 70.25748205 W 148.74452853 BP _MWD+IFR+MS
5917.24 45.12 159.59 5056.25 5136.32 2132.27 2228.69 -2019.39 914.71 0.84 0.48 -0.98 5945264.93 655353.84 N 70.25730970 W 148.74434358 BP _MWD+IFR+MS
6013.41 45.16 155.70 5124.10 5204.17 2197.12 2296.85 -2082.41 940.62 2.87 0.04 -4.04 5945202.45 655381.04 N 70.25713752 W 148.74413419 BP_MWD+IFR+MS
6109.21 44.98 157.32 5191.76 5271 .83 2262.06 2364.67 ·2144.60 967.66 1.21 -0.19 1.69 5945140.83 655409.34 N 70.25696759 W 148.74391580 BP _MWD+IFR+MS
6205.94 44.84 156.49 5260.27 5340.34 2327.31 2432.96 -2207.42 994.44 0.62 -0.14 -0.86 5945078.58 655437.41 N 70.25679597 W 148.74369940 BP _MWD+IFR+MS
6301.09 45.05 153.08 5327.62 5407.69 2392.21 2500.16 -2268.21 1023.07 2.54 0.22 -3.58 5945018.39 655467.28 N 70.25662988 W 148.74346810 BP _MWD+IFR+MS
6396.14 45.54 154.97 5394.49 5474.56 2457.67 2567.72 -2328.94 1052.66 1.50 0.52 1.99 5944958.29 655498.10 N 70.25646396 W 148.74322913 BP _MWD+IFR+MS
6491.71 44.68 151.80 5461.95 5542.02 2523.45 2635.42 -2389.46 1082.97 2.52 -0.90 -3.32 5944898.40 655529.64 N 70.25629861 W 148.74298425 BP _MWD+IFR+MS
6586.77 44.05 149.76 5529.91 5609.98 2588.68 2701.88 -2447.47 1115.41 1.64 -0.66 -2.15 5944841.08 655563.26 N 70.25614012 W 148.74272219 BP _MWD+IFR+MS
6683.47 43.68 150.27 5599.63 5679.70 2654.62 2768.89 -2505.51 1148.90 0.53 -0.38 0.53 5944783.74 655597.93 N 70.25598155 W 148.74245164 BP _MWD+IFR+MS
6779.05 43.12 151.48 5669.07 5749.14 2719.05 2834.56 -2562.88 1180.86 1.05 -0.59 1.27 5944727.05 655631.06 N 70.25582482 W 148.74219341 BP _MWD+IFR+MS
6875.65 42.35 149.72 5740.03 5820.10 2783.43 2900.11 -2619.99 1213.03 1.47 -0.80 -1.82 5944670.61 655664.40 N 70.25566879 W 148.74193352 BP _MWD+IFR+MS
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-301A-30AIA-30A
Generated 8/5/2004 2:37 PM Page 2 of 6
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude Survey Tool
Depth Section Departure Model
(It) (deg) (deg) (It) (It) (It) (It) (It) (It) (degl100 It) (degl100 It) (degl100 It) (ltUS) (ltUS)
6971.04 42.91 147.76 5810.21 5890.28 2847.23 2964.71 -2675.20 1246.56 1.51 0.59 -2.05 5944616.10 655699.05 N 70.25551792 W 148.74166268 BP _MWD+IFR+MS
7065.64 42.59 149.88 5879.68 5959.75 2910.64 3028.92 -2730.13 1279.80 1.56 -0.34 2.24 5944561 .87 655733.41 N 70.25536784 W 148.74139412 BP _MWD+IFR+MS
7162.37 42.28 147.82 5951.08 6031.15 2975.08 3094.19 -2785.99 1313.56 1.47 -0.32 -2.13 5944506.72 655768.30 N 70.25521524 W 148.74112144 BP _MWD+IFR+MS
7257.24 42.74 147.79 6021.01 6101.08 3038.55 3158.29 -2840.23 1347.71 0.49 0.48 -0.03 5944453.19 655803.56 N 70.25506702 W 148.74084552 BP _MWD+IFR+MS
7353.47 42.30 149.20 6091 .94 6172.01 3102.83 3223.33 -2895.68 1381.70 1.09 -0.46 1.47 5944398.46 655838.67 N 70.25491553 W 148.74057098 BP _MWD+IFR+MS
7449.46 42.30 151.50 6162.94 6243.01 3166.32 3287.92 -2951.81 1413.66 1.61 0.00 2.40 5944342.99 655871 .77 N 70.25476216 W 148.74031286 BP _MWD+IFR+MS
7544.75 42.34 151.07 6233.40 6313.47 3229.18 3352.08 -3008.08 1444.48 0.31 0.04 -0.45 5944287.37 655903.74 N 70.25460842 W 148.74006388 BP _MWD+IFR+MS
7640.53 42.78 151.72 6303.95 6384.02 3292.63 3416.86 -3064.95 1475.49 0.65 0.46 0.68 5944231.15 655935.91 N 70.25445303 W 148.73981338 BP _MWD+IFR+MS
7735.81 43.13 151.19 6373.68 6453.75 3356.20 3481.79 -3121.99 1506.52 0.53 0.37 -0.56 5944174.77 655968.09 N 70.25429720 W 148.73956278 BP _MWD+IFR+MS
7831 .03 42.80 153.47 6443.36 6523.43 3419.53 3546.68 -3179.45 1536.66 1.67 -0.35 2.39 5944117 .94 655999.40 N 70.25414019 W 148.73931937 BP _MWD+IFR+MS
7926.86 42.08 152.54 6514.09 6594.16 3482.47 3611.35 -3237.08 1566.01 1.00 -0.75 -0.97 5944060.94 656029.92 N 70.25398276 W 148.73908232 BP _MWD+IFR+MS
8022.34 42.56 151.99 6584.68 6664.75 3545.23 3675.63 -3293.97 1595.92 0.63 0.50 -0.58 5944004.67 656061.00 N 70.25382730 W 148.73884069 BP _MWD+IFR+MS
8118.06 41.81 152.62 6655.61 6735.68 3607.97 3739.91 -3350.88 1625.80 0.90 -0.78 0.66 5943948.39 656092.03 N 70.25367180 W 148.73859939 BP _MWD.S
8214.33 41.77 151.69 6727.39 6807.46 3670.63 3804.06 -3407.61 1655.76 0.65 -0.04 -0.97 5943892.29 656123.15 N 70.25351682 W 148.73835739 BP MWD S
8310.06 43.22 151.70 6797.97 6878.04 3733.89 3868.73 -3464.54 1686.43 1.51 1.51 0.01 5943836.00 656154.97 N 70.25336126 W 148.73810974 BP _MWD+I +MS
8406.16 43.89 152.22 6867.62 6947.69 3798.61 3934.94 -3522.99 1717.55 0.79 0.70 0.54 5943778.21 656187.29 N 70.25320157 W 148.73785836 BP _MWD+IFR+MS
8501.93 42.95 158.43 6937.21 7017.28 3861.96 4000.74 -3582.73 1745.03 4.56 -0.98 6.48 5943719.05 656215.98 N 70.25303834 W 148.73763644 BP _MWD+IFR+MS
8597.09 44.08 158.13 7006.22 7086.29 3924.09 4066.26 -3643.60 1769.28 1.21 1.19 -0.32 5943658.70 656241.47 N 70.25287204 W 148.73744063 BP _MWD+IFR+MS
8693.56 45.79 159.35 7074.51 7154.58 3988.51 4134.39 -3707.10 1793.98 1.98 1.77 1.26 5943595.72 656267.46 N 70.25269855 W 148.73724123 BP _MWD+IFR+MS
8788.59 44.13 158.22 7141.75 7221.82 4051.98 4201.54 -3769.70 1818.27 1.94 -1.75 -1.19 5943533.64 656293.03 N 70.25252752 W 148.73704512 BP _MWD+IFR+MS
8884.29 42.04 159.16 7211.64 7291.71 4113.81 4266.90 -3830.59 1842.03 2.28 -2.18 0.98 5943473.25 656318.04 N 70.25236114 W 148.73685323 BP _MWD+IFR+MS
8979.37 41.14 157.24 7282.75 7362.82 4173.67 4330.01 -3889.19 1865.46 1.64 -0.95 -2.02 5943415.15 656342.66 N 70.25220105 W 148.73666408 BP _MWD+IFR+MS
9075.49 39.43 158.22 7356.08 7436.15 4232.78 4392.16 -3946.69 1889.02 1.90 -1.78 1.02 5943358.14 656367.39 N 70.25204392 W 148.73647384 BP _MWD+IFR+MS
9171.06 37.72 154.61 7430.80 7510.87 4289.84 4451.74 -4001.30 1912.82 2.96 -1.79 -3.78 5943304.04 656392.30 N 70.25189473 W 148.73628166 BP _MWD+IFR+MS
9266.35 36.77 151.97 7506.66 7586.73 4345.89 4509.40 -4052.81 1938.72 1.95 -1.00 -2.77 5943253.07 656419.26 N 70.25175398 W 148.73607249 BP _MWD+IFR+MS
9362.56 36.16 151.55 7584.03 7664.10 4401.82 4566.58 -4103.19 1965.78 0.69 -0.63 -0.44 5943203.27 656447.34 N 70.25161634 W 148.73585402 BP _MWD+IFR+MS
9460.01 37.01 148.90 7662.29 7742.36 4458.93 4624.66 -4153.58 1994.62 1.84 0.87 -2.72 5943153.48 656477.21 N 70.25147864 W 148.73562106 BP _MWD+IFR+MS
9555.84 36.88 149.55 7738.88 7818.95 4515.74 4682.25 -4203.07 2024.10 0.43 -0.14 0.68 5943104.61 656507.69 N 70.25134342 W 148.73538307 BP_MWD+IFR+MS
9649.45 36.84 147.77 7813.78 7893.85 4571.21 4738.40 -4251.03 2053.30 1.14 -0.04 -1.90 5943057.27 656537.87 N 70.25121239 W 148.73514725 BP _MWD+IFR+MS
9742.08 37.03 147.75 7887.82 7967.89 4626.33 4794.07 -4298.11 2082.99 0.21 0.21 -0.02 5943010.81 656568.52 N 70.25108375 W 148.73490746 BP _MWD+IFR+MS
9841.56 37.29 148.13 7967.10 8047.17 4685.80 4854.16 -4349.03 2114.89 0.35 0.26 0.38 5942960.55 656601.45 N 70.25094460 W 148.73464990 BP _MWD+IFR+MS
9937.09 36.00 144.43 8043.75 8123.82 4742.42 4911.16 -4396.45 2146.50 2.68 -1.35 -3.87 5942913.79 656634.03 N 70.25081 502 W 148.73439459 BP _MWD+IFR+MS
10033.35 35.80 148.15 8121.74 8201.81 4798.48 4967.59 -4443.39 2177.82 2.28 -0.21 3.86 5942867.51 656666.30 N 70.25068678 W 148.73414170 BP _MWD+I.
10128.66 36.02 147.73 8198.93 8279.00 4853.81 5023.49 -4490.76 2207.49 0.35 0.23 -0.44 5942820.76 656696.93 N 70.25055733 W 148.73390209 BP MWD+I
10224.50 36.02 148.17 8276.45 8356.52 4909.59 5079.85 -4538.53 2237.40 0.27 0.00 0.46 5942773.62 656727.81 N 70.25042680 W 148.73366059 BP _MWD+IF S
10319.82 36.07 149.30 8353.52 8433.59 4964.99 5135.94 -4586.47 2266.51 0.70 0.05 1.19 5942726.29 656757.89 N 70.25029581 W 148.73342556 BP _MWD+IFR+MS
10415.28 36.35 146.87 8430.55 8510.62 5020.78 5192.33 -4634.33 2296.32 1.53 0.29 -2.55 5942679.05 656788.68 N 70.25016504 W 148.73318485 BP _MWD+I FR+MS
10510.39 34.95 145.87 8507.83 8587.90 5075.84 5247.76 -4680.49 2327.01 1.59 -1.47 -1.05 5942633.54 656820.31 N 70.25003892 W 148.73293702 BP _MWD+IFR+MS
10606.72 34.47 146.55 8587.02 8667.09 5130.34 5302.61 -4726.07 2357.52 0.64 -0.50 0.71 5942588.59 656851.74 N 70.24991435 W 148.73269069 BP _MWD+IFR+MS
10702.48 34.19 145.75 8666.10 8746.17 5184.01 5356.61 -4770.92 2387.60 0.55 -0.29 -0.84 5942544.37 656882.73 N 70.24979180 W 148.73244780 BP _MWD+IFR+MS
10729.73 34.12 143.81 8688.65 8768.72 5199.25 5371.91 -4783.42 2396.42 4.01 -0.26 -7.12 5942532.06 656891.81 N 70.24975765 W 148.73237657 BP _MWD+IFR+MS
10797.00 34.12 143.81 8744.34 8824.41 5236.89 5409.64 -4813.87 2418.70 0.00 0.00 0.00 5942502.07 656914.71 N 70.24967443 W 148.73219666 BP _MWD+IFR+MS
10807.69 35.89 145.78 8753.10 8833.17 5242.99 5415.78 -4818.89 2422.24 19.64 16.56 18.43 5942497.13 656918.34 N 70.24966074 W 148.73216813 BP _MWD+IFR+MS
10838.19 42.15 147.16 8776.78 8856.85 5262.05 5434.97 -4834.89 2432.82 20.72 20.52 4.52 5942481.35 656929.25 N 70.24961700 W 148.73208264 BP _MWD+IFR+MS
10873.40 49.87 147.33 8801.22 8881 .29 5287.15 5460.28 -4856.18 2446.52 21.93 21.93 0.48 5942460.35 656943.38 N 70.24955883 W 148.73197208 BP _MWD+IFR+MS
10902.84 55.46 148.24 8819.07 8899.14 5310.32 5483.68 -4875.98 2458.99 19.15 18.99 3.09 5942440.81 656956.25 N 70.24950473 W 148.73187142 BP _MWD+IFR+MS
10934.02 62.91 147.48 8835.03 8915.10 5336.81 5510.44 -4898.64 2473.23 23.99 23.89 -2.44 5942418.45 656970.95 N 70.24944282 W 148.73175643 BP _MWD+IFR+MS
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-301A-30AIA-30A
Generated 8/5/2004 2:37 PM Page 3 of 6
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Eaating Latitude Longitude Survey Tool
Depth Section Departure Model
(It) (dog) (dog) (It) (It) (ft) (ft) (ft) (ft) (degJ100ft) (degJ100ft) (degl100ft) (ftUS) (ftUS)
10967.11 70.53 145.76 8848.10 8928.17 5366.96 5540.81 -4923.99 2489.95 23.52 23.03 -5.20 5942393.45 656988.19 N 70.24937354 W 148.73162142 BP _MWD+IFR+MS
10998.98 76.64 142.50 8857.10 8937.17 5397.43 5571.37 -4948.74 2507.86 21.53 19.17 -10.23 5942369.07 657006.60 N 70.24930591 W 148.73147678 BP _MWD+IFR+MS
11016.66 80.04 139.89 8860.67 8940.74 5414.73 5588.68 -4962.23 2518.71 24.06 19.23 -14.76 5942355.81 657017.73 N 70.24926905 W 148.73138917 BP_MWD+iFR+MS
11029.44 82.67 137.69 8862.59 8942.66 5427.36 5601 .32 -4971.73 2527.03 26.70 20.58 -17.21 5942346.48 657026.24 N 70.24924308 W 148.73132196 BP_MWD+IFR+MS
11060.98 89.43 136.19 8864.77 8944.84 5458.77 5632.76 -4994.71 2548.51 21.95 21.43 -4.76 5942323.95 657048.18 N 70.24918029 W 148.73114858 BP _MWD+IFR+MS
11094.64 88.60 136.78 8865.34 8945.41 5492.37 5666.42 -5019.11 2571.68 3.03 -2.47 1.75 5942300.03 657071.85 N 70.24911360 W 148.73096146 BP _MWD+IFR+MS
11124.52 87.78 137.47 8866.29 8946.36 5522.21 5696.28 -5041 .00 2592.00 3.59 -2.74 2.31 5942278.57 657092.61 N 70.24905379 W 148.73079737 BP _MWD+IFR+MS
11158.09 87.61 137.15 8867.64 8947.71 5555.72 5729.82 -5065.65 2614.74 1.08 -0.51 -0.95 5942254.38 657115.85 N 70.24898641 W 148.73061372 BP _MWD+IFR+MS
11189.62 87.16 137.75 8869.08 8949.15 5587.19 5761.32 -5088.86 2636.04 2.38 -1.43 1.90 5942231.62 657137.62 N 70.24892300 W 148.73044173 BP _MWD+IFR+MS
11220.94 86.82 137.82 8870.72 8950.79 5618.45 5792.60 -5112.02 2657.06 1.11 -1.09 0.22 5942208.90 657159.10 N 70.24885970 W 148.73027204 BP _MWD+IFR+MS
11253.30 86.18 138.47 8872.70 8952.77 5650.73 5824.90 -5136.08 2678.61 2.82 -1.98 2.01 5942185.29 657181.14 N 70.24879395 W 148.73009801 BP _MWD+IFR+MS
11284.87 86.15 138.83 8874.81 8954.88 5682.23 5856.40 -5159.72 2699.42 1.14 -0.10 1.14 5942162.07 657202.43 N 70.24872933 W 148.72992998 BP _MWD+IFR+MS
11315.54 88.18 139.05 8876.33 8956.40 5712.86 5887.03 -5182.82 2719.54 6.66 6.62 0.72 5942139.40 657223.02 N 70.24866621 W 148.72976752 BP _MWD+.S
11350.29 89.32 139.34 8877.08 8957.15 5747.60 5921.77 -5209.12 2742.24 3.38 3.28 0.83 5942113.57 657246.26 N 70.24859435 W 148.72958421 BP _MWD+I +MS
Tie-In Survey 11382.26 89.94 140.74 8877.29 8957.36 5779.56 5953.74 -5233.62 2762.77 4.79 1.94 4.38 5942089.50 657267.28 N 70.24852739 W 148.72941843 BP _MWD+IFR+MS
Inclination Trend Survey 11419.23 88.39 140.75 8877.83 8957.90 5816.52 5990.70 -5262.25 2786.16 4.19 -4.19 0.03 5942061.36 657291.25 N 70.24844917 W 148.72922957 BP _INC+ TREND
11449.70 88.08 140.45 8878.77 8958.84 5846.98 6021.16 -5285.78 2805.49 1.42 -1.02 -0.98 5942038.23 657311.06 N 70.24838485 W 148.72907349 BP_INC+TREND
11482.36 90.27 136.93 8879.24 8959.31 5879.62 6053.81 -5310.30 2827.05 12.69 6.71 -10.78 5942014.16 657333.11 N 70.24831783 W 148.72889946 BP _INC+ TREND
11513.31 90.14 131.97 8879.13 8959.20 5910.43 6084.76 -5331.97 2849.13 16.03 -0.42 -16.03 5941992.95 657355.64 N 70.24825862 W 148.72872112 BP _INC+ TREND
11544.24 90.27 127.21 8879.02 8959.09 5940.86 6115.69 -5351.68 2872.96 15.39 0.42 -15.39 5941973.74 657379.86 N 70.24820476 W 148.72852870 BP_INC+TREND
11578.55 90.14 124.28 8878.89 8958.96 5974.15 6150.00 -5371.72 2900.81 8.55 -0.38 -8.54 5941954.27 657408.11 N 70.24814998 W 148.72830385 BP_INC+TREND
11610.61 91.40 119.40 8878.46 8958.53 6004.64 6182.06 -5388.62 2928.03 15.72 3.93 -15.22 5941937.93 657435.67 N 70.24810376 W 148.72808399 BP_INC+TREND
11639.59 91.71 114.26 8877.68 8957.75 6031.32 6211.03 -5401.69 2953.87 17.76 1.07 -17.74 5941925.39 657461.78 N 70.24806803 W 148.72787530 BP _INC+ TREND
11672.36 91.65 110.28 8876.71 8956.78 6060.37 6243.78 -5414.11 2984.18 12.14 -0.18 -12.15 5941913.61 657492.33 N 70.24803409 W 148.72763053 BP _INC+ TREND
11704.32 91.37 105.45 8875.87 8955.94 6087.49 6275.73 -5423.90 3014.58 15.13 -0.88 -15.11 5941904.43 657522.92 N 70.24800729 W 148.72738501 BP _INC+ TREND
11736.03 91.44 100.70 8875.09 8955.16 6112.91 6307.43 -5431.07 3045.45 14.98 0.22 -14.98 5941897.90 657553.93 N 70.24798767 W 148.72713568 BP _INC+ TREND
11769.72 90.99 100.92 8874.38 8954.45 6139.11 6341.12 -5437.39 3078.53 1.49 -1.34 0.65 5941892.26 657587.13 N 70.24797037 W 148.72686846 BP _INC+ TREND
11801.81 90.72 100.65 8873.90 8953.97 6164.05 6373.20 -5443.39 3110.05 1.19 -0.84 -0.84 5941886.91 657618.77 N 70.24795394 W 148.72661388 BP _INC+ TREND
11832.22 90.41 101.96 8873.60 8953.67 6187.87 6403.61 -5449.35 3139.87 4.43 -1.02 4.31 5941881.56 657648.70 N 70.24793762 W 148.72637304 BP _INC+ TREND
11863.85 89.28 102.23 8873.69 8953.76 6212.91 6435.24 -5455.98 3170.80 3.67 -3.57 0.85 5941875.57 657679.75 N 70.24791948 W 148.72612325 BP_INC+TREND
11896.07 88.32 104.37 8874.36 8954.43 6238.82 6467.45 -5463.39 3202.14 7.28 -2.98 6.64 5941868.80 657711.24 N 70.24789920 W 148.72587006 BP _INC+ TREND
11928.06 88.59 110.02 8875.22 8955.29 6265.76 6499.43 -5472.84 3232.68 17.68 0.84 17.66 5941859.98 657741.96 N 70.24787334 W 148.72562344 BP _INC+ TREND
11960.51 90.34 114.40 8875.53 8955.60 6294.53 6531.88 -5485.10 3262.71 14.53 5.39 13.50 5941848.34 657772.24 N 70.24783981 W 148.72538090 BP INC+TRIIt
11991.64 92.37 118.24 8874.79 8954.86 6323.08 6563.00 -5498.90 3290.60 13.95 6.52 12.34 5941835.12 657800.40 N 70.24780209 W 148.72515568 BP_INC+TRE
12022.49 93.33 117.52 8873.26 8953.33 6351.67 6593.81 -5513.31 3317.84 3.89 3.11 -2.33 5941821.27 657827.92 N 70.24776269 W 148.72493573 BP _INC+ TREND
12056.31 93.19 116.64 8871.33 8951 .40 6382.83 6627.57 -5528.68 3347.90 2.63 -0.41 -2.60 5941806.52 657858.29 N 70.24772067 W 148.72469296 BP_INC+TREND
12088.50 92.71 116.77 8869.68 8949.75 6412.41 6659.72 -5543.13 3376.62 1.54 -1.49 0.40 5941792.67 657887.30 N 70.24768116 W 148.72446104 BP_INC+TREND
12118.01 92.06 116.95 8868.45 8948.52 6439.57 6689.21 -5556.45 3402.92 2.29 -2.20 0.61 5941779.89 657913.87 N 70.24764474 W 148.72424862 BP_INC+TREND
12151.64 91.65 118.35 8867.36 8947.43 6470.71 6722.82 -5572.04 3432.69 4.34 -1.22 4.16 5941764.91 657943.95 N 70.24760209 W 148.72400819 BP _INC+ TREND
12185.04 91.10 120.48 8866.56 8946.63 6502.02 6756.21 -5588.44 3461.78 6.58 -1.65 6.38 5941749.11 657973.37 N 70.24755725 W 148.72377332 BP _INC+ TREND
12216.16 92.61 119.09 8865.55 8945.62 6531.25 6787.31 -5603.89 3488.77 6.59 4.85 -4.47 5941734.22 658000.67 N 70.24751501 W 148.72355535 BP _INC+ TREND
12247.46 93.91 119.17 8863.77 8943.84 6560.50 6818.56 -5619.10 3516.07 4.16 4.15 0.26 5941719.57 658028.27 N 70.24747342 W 148.72333492 BP _INC+ TREND
12279.59 93.02 119.62 8861.83 8941.90 6590.57 6850.63 -5634.85 3544.01 3.10 -2.77 1.40 5941704.41 658056.52 N 70.24743038 W 148.72310929 BP _INC+ TREND
12311.05 93.05 121.57 8860.16 8940.23 6620.24 6882.05 -5650.83 3571.05 6.19 0.10 6.20 5941688.98 658083.89 N 70.24738666 W 148.72289093 BP _INC+ TREND
12343.27 92.26 121.37 8858.67 8938.74 6650.80 6914.23 -5667.64 3598.50 2.53 -2.45 -0.62 5941672.74 658111.67 N 70.24734073 W 148.72266926 BP _INC+ TREND
12375.05 91.92 120.77 8857.51 8937.58 6680.89 6945.99 -5684.03 3625.70 2.17 -1.07 -1.89 5941656.91 658139.20 N 70.24729591 W 148.72244960 BP _INC+ TREND
12407.10 92.88 117.04 8856.17 8936.24 6710.81 6978.01 -5699.50 3653.73 12.01 3.00 -11.64 5941642.02 658167.54 N 70.24725360 W 148.72222328 BP _INC+ TREND
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-301A-30AIA-30A
Generated 8/5/2004 2:37 PM Page 4 of 6
Comments Measured I Inclination I A2imuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DlS I Build Rate I Walk Rate I Northing Easting la1nude longitude Survey Tool
Depth Section Departure Model
(It) (dog) (dog) (It) (It) (It) (It) (It) (It) (deg/100 It) (deg/100 It) (deg/lOO It) (ltUS) (ltUS)
12440.69 93.12 111.59 8854.41 8934.48 6741.09 7011.56 -5713.31 3684.29 16.22 0.71 -16.22 5941628.84 658198.37 N 70.24721584 W 148.72197651 BP_INC+TREND
12470.92 92.91 113.68 8852.82 8932.89 6767.96 7041.74 -5724.93 3712.15 6.94 -0.69 6.91 5941617.80 658226.46 N 70.24718406 W 148.72175152 BP _INC+ TREND
12502.47 92.06 112.45 8851.45 8931.52 6796.12 7073.26 -5737.28 3741.15 4.74 -2.69 -3.90 5941606.05 658255.71 N 70.24715029 W 148.72151733 BP _INC+TREND
12534.72 90.31 113.88 8850.79 8930.86 6824.95 7105.51 -5749.96 3770.79 7.01 -5.43 4.43 5941593.98 658285.60 N 70.24711560 W 148.72127796 BP _INC+TREND
Tie-In Survey 12567.30 88.90 113.08 8851.01 8931.08 6854.17 7138.08 -5762.94 3800.67 4.98 -4.33 -2.46 5941581.61 658315.74 N 70.24708010 W 148.72103666 BP _INC+TREND
Continue Inc Trend 12597.99 88.39 113.83 8851.74 8931.81 6881 .67 7168.77 -5775.15 3828.82 2.95 -1.66 2.44 5941569.98 658344.13 N 70.24704670 W 148.72080936 BP _INC+ TREND
12631.07 85.85 116.09 8853.40 8933.47 6911.66 7201.80 -5789.09 3858.77 10.27 -7.68 6.83 5941556.66 658374.35 N 70.24700858 W 148.72056752 BP _INC+ TREND
12693.81 86.57 117.35 8857.55 8937.62 6969.27 7264.40 -5817.24 3914.68 2.31 1.15 2.01 5941529.67 658430.83 N 70.24693160 W 148.72011600 BP _INC+ TREND
12726.83 88.70 116.76 8858.91 8938.98 6999.71 7297.39 -5832.24 3944.06 6.69 6.45 -1.79 5941515.27 658460.51 N 70.24689056 W 148.71987875 BP _INC+TREND
12758.38 89.55 117.65 8859.39 8939.46 7028.84 7328.94 -5846.66 3972.12 3.90 2.69 2.82 5941501.43 658488.85 N70.24685112 W 148.71965220 BP_INC+TREND
12789.77 91.34 114.35 8859.15 8939.22 7057.57 7360.33 -5860.42 4000.33 11.96 5.70 -10.51 5941488.25 658517.34 N70.24681350 W 148.71942443 BP_INC+TREND
12821 .39 91.44 114.79 8858.38 8938.45 7086.18 7391.94 -5873.57 4029.07 1.43 0.32 1.39 5941475.70 658546.35 N 70.24677755 W 148.71919228 BP _INC+ T.
12853.44 90.51 114.66 8857.83 8937.90 7115.21 7423.98 -5886.97 4058.18 2.93 -2.90 -0.41 5941462.90 658575.72 N 70.24674089 W 148.71895723 BP INC+T
12884.16 90.07 114.34 8857.68 8937.75 7143.00 7454.70 -5899.71 4086.13 1.77 -1.43 -1.04 5941450.74 658603.93 N 70.24670605 W 148.71873151 BP _INC+ TR
12917.83 89.79 111.86 8857.72 8937.79 7173.09 7488.37 -5912.92 4117.10 7.41 -0.83 -7.37 5941438.17 658635.16 N 70.24666991 W 148.71848144 BP _INC+TREND
12949.95 89.52 111.51 8857.91 8937.98 7201.43 7520.49 -5924.79 4146.95 1.38 -0.84 -1.09 5941426.91 658665.24 N 70.24663745 W 148.71824042 BP _INC+TREND
12979.92 88.97 114.09 8858.31 8938.38 7228.14 7550.46 -5936.40 4174.57 8.80 -1.84 8.61 5941415.87 658693.09 N 70.24660568 W 148.71801736 BP_INC+TREND
13013.06 88.36 116.28 8859.08 8939.15 7258.27 7583.59 -5950.49 4204.55 6.86 -1.84 6.61 5941402.39 658723.35 N 70.24656712 W 148.71777528 BP _INC+TREND
13044.22 88.56 117.37 8859.92 8939.99 7286.96 7614.74 -5964.55 4232.35 3.56 0.64 3.50 5941388.91 658751.43 N 70.24652868 W 148.71755083 BP_INC+TREND
13075.50 88.46 115.11 8860.73 8940.80 7315.63 7646.01 -5978.38 4260.39 7.23 -0.32 -7.23 5941375.66 658779.75 N 70.24649087 W 148.71732437 BP_INC+TREND
13107.59 88.22 110.58 8861.66 8941.73 7344.23 7678.08 -5990.83 4289.95 14.13 -0.75 -14.12 5941363.82 658809.55 N 70.24645681 W 148.71708573 BP_INC+TREND
13139.77 88.25 108.03 8862.65 8942.72 7371.96 7710.25 -6001.46 4320.30 7.92 0.09 -7.92 5941353.82 658840.11 N 70.24642772 W 148.71684062 BP _INC+TREND
13170.98 88.05 109.18 8863.66 8943.73 7398.65 7741.44 -6011.41 4349.86 3.74 -0.64 3.68 5941344.47 658869.87 N 70.24640048 W 148.71660188 BP _INC+ TREND
13203.47 88.29 107.93 8864.70 8944.77 7426.43 7773.92 -6021.74 4380.65 3.92 0.74 -3.85 5941334.77 658900.86 N 70.24637220 W 148.71635329 BP_INC+TREND
13235.46 87.98 111.43 8865.74 8945.81 7454.10 7805.89 -6032.51 4410.75 10.98 -0.97 10.94 5941324.63 658931.17 N 70.24634274 W 148.71611021 BP_INC+TREND
13266.32 87.98 111.08 8866.83 8946.90 7481.20 7836.73 -6043.69 4439.49 1.13 0.00 -1.13 5941314.04 658960.1 3 N 70.24631215 W 148.71587811 BP_INC+TREND
13298.98 87.47 113.11 8868.12 8948.19 7510.11 7869.36 -6055.96 4469.73 6.40 -1.56 6.22 5941302.39 658990.61 N 70.24627857 W 148.71563395 BP_INC+TREND
13330.96 86.92 113.09 8869.69 8949.76 7538.65 7901.31 -6068.50 4499.11 1.72 -1.72 -0.06 5941290.46 659020.24 N 70.24624429 W 148.71539671 BP_INC+TREND
1 3361.37 86.81 113.68 8871.35 8951.42 7565.86 7931.67 -6080.55 4526.98 1.97 -0.36 1.94 5941278.99 659048.35 N 70.24621132 W 148.71517167 BP_INC+TREND
13393.83 88.70 110.88 8872.62 8952.69 7594.63 7964.10 -6092.84 4556.99 10.40 5.82 -8.63 5941267.31 659078.60 N70.24617768 W 148.71492935 BP_INC+TREND
13426.42 88.73 112.31 8873.35 8953.42 7623.36 7996.69 -6104.83 4587.28 4.39 0.09 4.39 5941255.94 659109.14 N 70.24614487 W 148.71468472 BP_INC+TREND
13456.97 90.65 109.36 8873.52 8953.59 7650.10 8027.23 -6115.70 4615.83 11.52 6.28 -9.66 5941245.67 659137.90 N 70.24611514 W 148.71445421 BP_INC+TR.
13490.18 91.68 109.54 8872.84 8952.91 7678.76 8060.44 -6126.75 4647.14 3.15 3.10 0.54 5941235.26 659169.42 N 70.24608489 W 148.71420139 BP INC+TR
13521.70 92.61 109.94 8871.66 8951.73 7706.04 8091.93 -6137.39 4676.78 3.21 2.95 1.27 5941225.23 659199.28 N 70.24605577 W 148.71396199 BP _INC+TRE
13551.77 90.21 107.62 8870.92 8950.99 7731.81 8121.99 -6147.07 4705.24 11.10 -7.98 -7.72 5941216.14 659227.93 N 70.24602929 W 148.71373221 BP _INC+ TREND
13586.58 92.43 107.60 8870.12 8950.19 7761.28 8156.79 -6157.60 4738.41 6.38 6.38 -0.06 5941206.30 659261.30 N 70.24600047 W 148.71346437 BP _INC+ TREND
13617.84 93.29 108.55 8868.56 8948.63 7787.85 8188.01 -6167.28 4768.09 4.10 2.75 3.04 5941197.22 659291.17 N 70.24597396 W 148.71322470 BP _INC+ TREND
13648.84 95.39 107.29 8866.22 8946.29 7814.11 8218.92 -6176.79 4797.50 7.89 6.77 -4.06 5941188.32 659320.77 N 70.24594793 W 148.71298722 BP _INC+ TREND
13681.63 95.22 108.62 8863.18 8943.25 7841.86 8251.57 -6186.86 4828.56 4.07 -0.52 4.06 5941178.89 659352.02 N 70.24592038 W 148.71273642 BP _INC+TREND
13713.59 95.35 108.70 8860.24 8940.31 7869.11 8283.40 -6197.04 4858.71 0.48 0.41 0.25 5941169.33 659382.37 N 70.24589251 W 148.71249295 BP _INC+ TREND
13746.03 95.29 110.12 8857.23 8937.30 7896.98 8315.70 -6207.77 4889.17 4.36 -0.18 4.38 5941159.22 659413.05 N 70.24586313 W 148.71224695 BP _INC+ TREND
13777.23 94.77 108.43 8854.50 8934.57 7923.77 8346.78 -6218.03 4918.51 5.65 -1.67 -5.42 5941149.57 659442.59 N 70.24583505 W 148.71201006 BP _INC+ TREND
End Inc Trend 13805.69 95.15 109.36 8852.04 8932.11 7948.11 8375.13 -6227.21 4945.33 3.52 1.34 3.27 5941140.94 659469.59 N 70.24580992 W 148.71179345 BP_INC+TREND
TD (Projected) 13859.00 95.15 109.36 8847.25 8927.32 7993.91 8428.22 -6244.82 4995.42 0.00 0.00 0.00 5941124.37 659520.03 N 70.24576174 W 148.71138897 BP _BLIND
Survey Tvpe: Definitive Survey
NOTES: BOSS_GYRO - ( Sperry Sun BOSS Gyro multi-shot)
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-301A-30AIA-30A
Generated 8/5/2004 2:37 PM Page 5 of 6
Comments
Measured
Depth
(II)
LeQal Description:
I Inclination I Azimuth I Sub-Sea TVD I TVD ~:i.cal I ~ong rtHOle INS EW I DLS I Build Rate I Walk Rate I Northing Easting
(dog) (dog) (II) (II) (lI~n e~~te (II) (II) (degl1001l) (degl1001l) (degl100ll) (IIUS) (IIUS)
MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. )
INC+ TREND - ( Inclinometer + known azi trend .. Inclination only surveys In near-vertical hole-where formation dip and experience enables direction of drift to be predicted. )
{ Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. )
Surface: 2098 FSL 1014 FEL S35 T11N R13E UM
Tie-In: 2098 FSL 1014 FEL S35 T11 N R13E UM
BHL: 1132 FSL 1303 FEL S1 nON R13E UM
NorthinQ (V) rftUS]
5947264.98
5947264.59
5941124.37
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
Latitude
Longitude
EastinQ (X) rftUS]
654397.99
654397.86
659520.03
A-301A-301A-30AIA-30A
Generated 8/5/2004 2:37 PM Page 6 of 6
Survey Tool
Model
e
e
A-30APB1 Survey Report hlum rger
Report Date: 27 -Jun-04 Survey I DLS Computation Method: Minimum Curvature 1 Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 139.750'
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure I Slot: A-PAD 1 A-30 TVD Reference Datum: Rotary Table
Well: A-30 TVD Reference Elevation: 80.07 ft relative to MSL
Borehole: A-30APBI Sea Bed I Ground Level Elevation: 51.37 ft relative to MSL
UWVAPI#: 500292137270 Magnetic Declination: 25.195'
Survey Name I Date: A-30APBI 1 June 27, 2004 Total Field Strength: 57587.139nT
Tort I AHD I DDII ERD ratio: 263.893' 16709.21 ftl 6.380 1 0.749 Magnetic Dip: 80.833'
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: June 01 , 2004
Location LatILong: N 70.26282668, W 148.75173554 Magnetic Declination Model: BGGM 2003
Location Grid N/E YIX: N 5947264.980 ftUS, E 654397.990 ftUS North Reference: True North
Grid Convergence Angle: +1.17495222' Total Corr Mag North -> True North: +25.195' e
Grid Scale Factor: 0.99992708 Local Coordinates Referenced To: Well Head
I Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Lamude Longitude Survey Tool
Depth Section Departure Model
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg/100 ft) (deg1100 ft) (degl100 ft) (ftUS) (ftUS)
Surface 0.00 0.00 199.60 -80.07 0.00 0.21 0.00 -0.39 -0.14 0.00 0.00 0.00 5947264.59 654397.86 N 70.26282563 W 148.75173666
99.17 0.47 199.60 19.10 99.17 0.41 0.41 -0.77 -0.28 0.47 0.47 0.00 5947264.20 654397.73 N 70.26282457 W 148.75173777 BP _BOSS_GYRO
199.17 0.45 222.00 119.09 199.16 0.67 1.20 -1.45 -0.68 0.18 -0.02 22.40 5947263.52 654397.34 N 70.26282272 W 148.75174100 BP _BOSS_GYRO
299.17 0.47 205.19 219.09 299.16 0.89 2.00 -2.11 -1.11 0.14 0.02 -16.81 5947262.84 654396.92 N 70.26282091 W 148.75174454 BP _BOSS_GYRO
399.17 0.80 209.10 319.09 399.16 1.31 3.11 -3.10 -1.63 0.33 0.33 3.91 5947261.85 654396.43 N 70.26281823 W 148.75174870 BP _BOSS_GYRO
499.17 0.55 195.50 419.08 499.15 1.83 4.28 -4.17 -2.09 0.30 -0.25 -13.60 5947260.77 654395.98 N 70.26281530 W 148.75175248 BP _BOSS_GYRO
599.17 0.55 215.00 519.07 599.14 2.22 5.23 -5.02 -2.50 0.19 0.00 19.50 5947259.91 654395.60 N 70.26281296 W 148.75175574 BP _BOSS_GYRO
699.17 0.50 212.50 619.07 699.14 2.47 6.15 -5.78 -3.01 0.05 -0.05 -2.50 5947259.14 654395.10 N 70.26281088 W 148.75175986 BP _BOSS_GYRO
799.17 0.45 191.19 719.07 799.14 2.85 6.97 -6.54 -3.32 0.18 -0.05 -21.31 5947258.38 654394.81 N 70.26280882 W 148.75176237 BP _BOSS_GYRO
899.17 0.25 186.50 819.06 899.13 3.24 7.58 -7.14 -3.42 0.20 -0.20 -4.69 5947257.77 654394.72 N 70.26280718 W 148.75176319 BP _BOSS_GYRO
999.17 0.25 263.80 919.06 999.13 3.27 7.95 -7.38 -3.66 0.31 0.00 77.30 5947257.53 654394.48 N 70.26280652 W 148.75176514 BP _BOSS_GYRO
1099.17 0.37 232.50 1019.06 1099.13 3.13 8.48 ·7.60 -4.13 0.20 0.12 -31.30 5947257.30 654394.01 N 70.26280592 W 148.75176896 BP _BOSS_GYRO
1199.17 0.50 212.69 1119.06 1199.13 3.24 9.23 -8.16 -4.63 0.20 0.13 -19.81 5947256.72 654393.53 N 70.26280438 W 148.75177294 BP _BOSS_GYRO
1299.17 0.40 202.39 1219.06 1299.13 3.53 10.01 -8.85 -4.99 0.13 -0.10 -10.30 5947256.03 654393.18 N 70.26280249 W 148.75177592 BP _BOSS_GYRO
1399.17 0.33 226.80 1319.05 1399.12 3.71 10.64 -9.37 -5.34 0.17 -om 24.41 5947255.50 654392.85 N 70.26280107 W 148.75177869 BP _BOSS_GYRO
1499.17 0.47 221.50 1419.05 1499.12 3.78 11.34 -9.88 -5.82 0.14 0.14 -5.30 5947254.99 654392.37 N 70.26279970 W 148.75178258 BP BOSS _
1599.17 0.55 217.19 1519.05 1599.12 3.94 12.23 -10.57 -6.38 0.09 0.08 -4.31 5947254.28 654391.83 N 70.26279781 W 148.75178712 BP _BOSS_G
1699.17 0.55 209.10 1619.04 1699.11 4.22 13.19 -11.37 -6.90 0.08 0.00 -8.09 5947253.47 654391.32 N 70.26279562 W 148.75179136 BP _BOSS_GYRO
1799.17 1.38 173.11 1719.03 1799.10 5.39 14.83 -12.98 -6.99 0.99 0.83 -35.99 5947251.86 654391.26 N 70.26279121 W 148.75179208 BP _BOSS_GYRO
1899.17 3.00 163.70 1818.95 1899.02 8.79 18.64 -16.69 -6.11 1.65 1.62 -9.41 5947248.17 654392.22 N 70.26278108 W 148.75178497 BP _BOSS_GYRO
1999.17 5.30 160.61 1918.68 1998.75 15.50 25.87 -23.56 -3.85 2.31 2.30 -3.09 5947241.35 654394.63 N 70.26276232 W 148.75176664 BP _BOSS_GYRO
2099.17 8.00 156.11 2018.00 2098.07 26.49 37.45 -34.28 0.51 2.75 2.70 -4.50 5947230.72 654399.20 N 70.26273303 W 148.75173146 BP _BOSS_GYRO
2199.17 10.00 152.11 2116.77 2196.84 41.65 53.08 -48.32 7.39 2.09 2.00 -4.00 5947216.83 654406.36 N 70.26269468 W 148.75167584 BP _BOSS_GYRO
2299.17 13.18 148.20 2214.72 2294.79 61.41 73.17 -65.69 17.46 3.27 3.18 -3.91 5947199.67 654416.79 N 70.26264723 W 148.75159443 BP _BOSS_GYRO
2399.17 17.68 147.81 2311.09 2391.16 87.74 99.76 -88.24 31.56 4.50 4.50 -0.39 5947177.41 654431.35 N 70.26258562 W 148.75148042 BP _BOSS_GYRO
2499.17 19.57 148.61 2405.85 2485.92 119.33 131.70 -115.39 48.38 1.91 1.89 0.80 5947150.62 654448.72 N 70.26251145 W 148.75134450 BP _BOSS_GYRO
2599.17 20.82 151.40 2499.70 2579.77 153.28 166.21 -145.29 65.61 1.58 1.25 2.79 5947121.08 654466.56 N 70.26242975 W 148.75120522 BP _BOSS_GYRO
2699.17 21.22 152.31 2593.05 2673.12 188.35 202.08 -176.92 82.53 0.52 0.40 0.91 5947089.80 654484.12 N 70.26234335 W 148.75106848 BP _BOSS_GYRO
2799.17 21.60 152.11 2686.14 2766.21 224.00 238.59 -209.21 99.54 0.39 0.38 -0.20 5947057.87 654501.80 N 70.26225512 W 148.75093091 BP _BOSS_GYRO
2899.17 22.55 150.81 2778.81 2858.88 260.80 276.17 -242.22 117.51 1.07 0.95 -1.30 5947025.24 654520.43 N 70.26216495 W 148.75078572 BP _BOSS_GYRO
2999.17 24.12 149.70 2870.63 2950.70 299.74 315.78 -276.60 137.17 1.63 1.57 -1.11 5946991 .27 654540.79 N 70.26207101 W 148.75062680 BP_BOSS_GYRO
SurveyEditor Vel 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) A-301A-301A-30APB 1 1A-30APB 1 Generated 8/5/2004 2:38 PM Page 1 of 4
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude Survey Tòol
Depth Section Departure Model
(II) (dog) (dog) (II) (II) (II) (II) (II) (II) (degl1ooll) (degI1001l) (deg/1OOIl) (IIUS) (IIUS)
3099.17 25.82 150.31 2961 .28 3041.35 341.28 357.99 -313.17 158.27 1.72 1.70 0.61 5946955.15 654562.63 N 70.26197113 W 148.75045628 BP _BOSS_GYRO
3199.17 27.83 149.40 3050.52 3130.59 385.70 403.11 ·352.18 180.94 2.05 2.01 -0.91 5946916.61 654586.10 N 70.26186454 W 148.75027303 BP _BOSS_GYRO
3299.17 31.20 145.00 3137.54 3217.61 434.53 452.35 -393.51 207.69 4.00 3.37 -4.40 5946875.84 654613.69 N 70.26175164 W 148.75005682 BP _BOSS_GYRO
3399.17 33.07 144.81 3222.21 3302.28 487.50 505.54 -437.03 238.27 1.87 1.87 -0.19 5946832.96 654645.15 N 70.26163275 W 148.74980964 BP _BOSS_GYRO
Tie-In Survey 3399.19 33.07 144.81 3222.23 3302.30 487.51 505.55 -437.03 238.27 0.00 0.00 0.00 5946832.96 654645.16 N 70.26163272 W 148.74980959 BP _BOSS_GYRO
Top Window 3446.00 34.28 144.91 3261.18 3341.25 513.36 531.51 -458.26 253.21 2.59 2.58 0.21 5946812.04 654660.53 N 70.26157474 W 148.74968885 BP_BLlND
Base Window 3462.00 35.77 147.02 3274.29 3354.36 522.49 540.69 -465.87 258.35 12.00 9.31 13.19 5946804.54 654665.82 N 70.26155395 W 148.74964733 BP _BLIND
Blind survey 3474.00 35.77 147.02 3284.02 3364.09 529.45 547.70 -471.75 262.17 0.00 0.00 0.00 5946798.74 654669.76 N 70.26153787 W 148.74961647 BP _BLIND
First MWD+IFR+MS 3527.08 38.45 149.64 3326.35 3406.42 561.10 579.72 -499.01 278.96 5.86 5.05 4.94 5946771.83 654687.10 N 70.26146339 W 148.74948077 BP _MWD+IFR+MS
3621.83 43.30 159.69 3398.05 3478.12 620.77 641.62 -555.00 305.17 8.61 5.12 10.61 5946716.40 654714.45 N 70.26131044 W 148.74926892 BP _MWD+IFR+MS
3718.63 43.67 163.56 3468.30 3548.37 682.56 708.22 -618.19 326.15 2.78 0.38 4.00 5946653.65 654736.73 N 70.26113780 W 148.74909934 BP _MWD+IFR+MS
3813.92 43.65 155.57 3537.29 3617.36 744.35 773.95 -679.74 349.08 5.79 -0.02 -8.38 5946592.59 654760.91 N 70.26096966 W 148.74891402 BP _MWD+IFR+MS
3910.27 43.54 153.24 3607.07 3687.14 808.62 840.38 -739.65 377.78 1.67 -0.11 -2.42 5946533.29 654790.83 N 70.26080598 W 148.74868210 BP _MWD+IFR+MS
4005.51 42.92 156.24 3676.47 3756.54 871.62 905.61 -798.63 405.62 2.25 -0.65 3.15 5946474.90 654819.87 N 70.26064486 W 148.74845712 BP _MWD+.S
4100.45 42.26 156.44 3746.37 3826.44 933.19 969.86 -857.48 431.40 0.71 -0.70 0.21 5946416.59 654846.85 N 70.26048408 W 148.74824874 BP _MWD+I +MS
4196.49 43.37 157.38 3816.82 3896.89 995.56 1035.13 -917.52 456.99 1.33 1.16 0.98 5946357.09 654873.67 N 70.26032004 W 148.74804192 BP _MWD+IFR+MS
4293.03 43.10 156.98 3887.15 3967.22 1058.65 1101.26 -978.47 482.64 0.40 -0.28 ·0.41 5946296.68 654900.56 N 70.26015352 W 148.74783466 BP _MWD+IFR+MS
4387.20 44.06 155.31 3955.37 4035.44 1120.92 1166.17 -1037.83 508.90 1.59 1.02 -1.77 5946237.88 654928.03 N 70.25999134 W 148.74762246 BP _MWD+IFR+MS
4483.97 43.23 156.12 4025.40 4105.47 1185.14 1232.96 -1098.71 536.37 1.03 -0.86 0.84 5946177.58 654956.74 N 70.25982502 W 148.74740046 BP _MWD+IFR+MS
4579.76 43.99 156.79 4094.76 4174.83 1248.42 1299.03 -1159.28 562.76 0.93 0.79 0.70 5946117.57 654984.36 N 70.25965954 W 148.74718720 BP _MWD+IFR+MS
4675.82 43.98 155.63 4163.87 4243.94 1312.39 1365.74 -1220.32 589.67 0.84 -0.01 -1.21 5946057.10 655012.52 N 70.25949278 W 148.74696976 BP _MWD+IFR+MS
4770.96 43.07 154.85 4232.86 4312.93 1375.53 1431.26 -1279.82 617.11 1.11 -0.96 -0.82 5945998.18 655041.16 N 70.25933023 W 148.74674805 BP _MWD+IFR+MS
4866.63 44.11 158.69 4302.16 4382.23 1438.57 1497.21 -1340.42 643.10 2.97 1.09 4.01 5945938.13 655068.39 N 70.25916467 W 148.74653806 BP _MWD+IFR+MS
4962.36 43.31 158.86 4371 .36 4451.43 1501.11 1563.36 -1402.08 667.05 0.84 -0.84 0.18 5945876.98 655093.59 N 70.25899621 W 148.74634455 BP _MWD+IFR+MS
5057.71 44.25 159.71 4440.20 4520.27 1563.28 1629.33 -1463.79 690.38 1.16 0.99 0.89 5945815.77 655118.18 N 70.25882762 W 148.74615603 BP _MWD+IFR+MS
5153.11 43.97 159.36 4508.70 4588.77 1625.76 1695.73 -1526.00 713.59 0.39 -0.29 -0.37 5945754.05 655142.67 N 70.25865766 W 148.74596845 BP _MWD+IFR+MS
5249.30 44.35 158.18 4577.71 4657.78 1689.11 1762.74 -1588.46 737.86 0.94 0.40 -1.23 5945692.10 655168.21 N 70.25848702 W 148.74577238 BP _MWD+IFR+MS
5344.71 43.57 155.57 4646.39 4726.46 1752.39 1828.96 -1649.36 763.86 2.07 -0.82 -2.74 5945631 .75 655195.45 N 70.25832063 W 148.74556234 BP _MWD+IFR+MS
5439.95 44.88 158.55 4714.65 4794.72 1815.79 1895.38 -1710.53 789.72 2.58 1.38 3.13 5945571.13 655222.56 N 70.25815352 W 148.74535335 BP _MWD+IFR+MS
5535.36 44.55 156.22 4782.45 4862.52 1879.75 1962.51 -1772.49 815.53 1.75 -0.35 -2.44 5945509.72 655249.63 N 70.25798424 W 148.74514485 BP_MWD+IFR+MS
5631.47 43.62 156.08 4851.49 4931.56 1943.90 2029.37 -1833.64 842.56 0.97 -0.97 -0.15 5945449.14 655277.91 N 70.25781716 W 148.74492641 BP _MWD+IFR+MS
5726.11 43.66 157.91 4919.98 5000.05 2006.27 2094.68 -1893.76 868.09 1.34 0.04 1.93 5945389.56 655304.66 N 70.25765293 W 148.74472021 BP _MWD+IFR+MS
5822.15 44.66 160.52 4988.88 5068.95 2069.34 2161.58 -1956.30 891.81 2.16 1.04 2.72 5945327.52 655329.66 N 70.25748205 W 148.74452853 BP _MWD+IFR+MS
5917.24 45.12 159.59 5056.25 5136.32 2132.27 2228.69 -2019.39 914.71 0.84 0.48 -0.98 5945264.93 655353.84 N 70.25730970 W 148.74434358 BP MWD+I.
6013.41 45.16 155.70 5124.10 5204.17 2197.12 2296.85 -2082.41 940.62 2.87 0.04 -4.04 5945202.45 655381.04 N 70.25713752 W 148.74413419 BP _MWD+IF S
6109.21 44.98 157.32 5191.76 5271.83 2262.06 2364.67 -2144.60 967.66 1.21 -0.19 1.69 5945140.83 655409.34 N 70.25696759 W 148.74391580 BP _MWD+IFR+MS
6205.94 44.84 156.49 5260.27 5340.34 2327.31 2432.96 -2207.42 994.44 0.62 -0.14 -0.86 5945078.58 655437.41 N 70.25679597 W 148.74369940 BP _MWD+IFR+MS
6301.09 45.05 153.08 5327.62 5407.69 2392.21 2500.16 -2268.21 1023.07 2.54 0.22 -3.58 5945018.39 655467.28 N 70.25662988 W 148.74346810 BP _MWD+IFR+MS
6396.14 45.54 154.97 5394.49 5474.56 2457.67 2567.72 -2328.94 1052.66 1.50 0.52 1.99 5944958.29 655498.10 N 70.25646396 W 148.74322913 BP _MWD+IFR+MS
6491.71 44.68 151.80 5461.95 5542.02 2523.45 2635.42 -2389.46 1082.97 2.52 -0.90 -3.32 5944898.40 655529.64 N 70.25629861 W 148.74298425 BP _MWD+IFR+MS
6586.77 44.05 149.76 5529.91 5609.98 2588.68 2701.88 -2447.47 1115.41 1.64 -0.66 -2.15 5944841.08 655563.26 N 70.25614012 W 148.74272219 BP _MWD+IFR+MS
6683.47 43.68 150.27 5599.63 5679.70 2654.62 2768.89 -2505.51 1148.90 0.53 -0.38 0.53 5944783.74 655597.93 N 70.25598155 W 148.74245164 BP _MWD+IFR+MS
6779.05 43.12 151.48 5669.07 5749.14 2719.05 2834.56 -2562.88 1180.86 1.05 -0.59 1.27 5944727.05 655631.06 N 70.25582482 W 148.74219341 BP _MWD+IFR+MS
6875.65 42.35 149.72 5740.03 5820.10 2783.43 2900.11 -2619.99 1213.03 1.47 -0.80 -1.82 5944670.61 655664.40 N 70.25566879 W 148.74193352 BP _MWD+IFR+MS
6971 .04 42.91 147.76 5810.21 5890.28 2847.23 2964.71 -2675.20 1246.56 1.51 0.59 -2.05 5944616.10 655699.05 N 70.25551792 W 148.74166268 BP _MWD+IFR+MS
7065.64 42.59 149.88 5879.68 5959.75 2910.64 3028.92 -2730.13 1279.80 1.56 -0.34 2.24 5944561 .87 655733.41 N 70.25536784 W 148.74139412 BP _MWD+IFR+MS
7162.37 42.28 147.82 5951.08 6031.15 2975.08 3094.19 -2785.99 1313.56 1.47 -0.32 -2.13 5944506.72 655768.30 N 70.25521524 W 148.74112144 BP_MWD+IFR+MS
7257.24 42.74 147.79 6021.01 6101.08 3038.55 3158.29 -2840.23 1347.71 0.49 0.48 -0.03 5944453.19 655803.56 N 70.25506702 W 148.74084552 BP _MWD+IFR+MS
7353.47 42.30 149.20 6091.94 6172.01 3102.83 3223.33 -2895.68 1381.70 1.09 -0.46 1.47 5944398.46 655838.67 N 70.25491553 W 148.74057098 BP _MWD+IFR+MS
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546) A-301A-301A-30APB1 1A-30APB1 Generated 8/5/2004 2:38 PM Page 2 of 4
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude Survey TOol
Depth Section Departure Model
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (degl100 ft) (deg/100 ft) (deg/100 ft) (ftUS) (ftUS)
7449.46 42.30 151.50 6162.94 6243.01 3166.32 3287.92 ·2951.81 1413.66 1.61 0.00 2.40 5944342.99 655871 .77 N 70.25476216 W 148.74031286 BP _MWD+IFR+MS
7544.75 42.34 151.07 6233.40 6313.47 3229.18 3352.08 ·3008.08 1444.48 0.31 0.04 ·0.45 5944287.37 655903.74 N 70.25460842 W 148.74006388 BP _MWD+IFR+MS
7640.53 42.78 151.72 6303.95 6384.02 3292.63 3416.86 -3064.95 1475.49 0.65 0.46 0.68 5944231.15 655935.91 N 70.25445303 W 148.73981338 BP_MWD+IFR+MS
7735.81 43.13 151.19 6373.68 6453.75 3356.20 3481.79 ·3121.99 1506.52 0.53 0.37 ·0.56 5944174.77 655968.09 N 70.25429720 W 148.73956278 BP _MWD+IFR+MS
7831.03 42.80 153.47 6443.36 6523.43 3419.53 3546.68 ·3179.45 1536.66 1.67 ·0.35 2.39 5944117.94 655999.40 N 70.25414019 W 148.73931937 BP _MWD+IFR+MS
7926.86 42.08 152.54 6514.09 6594.16 3482.47 3611.35 ·3237.08 1566.01 1.00 ·0.75 -0.97 5944060.94 656029.92 N 70.25398276 W 148.73908232 BP _MWD+IFR+MS
8022.34 42.56 151.99 6584.68 6664.75 3545.23 3675.63 -3293.97 1595.92 0.63 0.50 -0.58 5944004.67 656061.00 N 70.25382730 W 148.73884069 BP _MWD+IFR+MS
8118.06 41.81 152.62 6655.61 6735.68 3607.97 3739.91 -3350.88 1625.80 0.90 -0.78 0.66 5943948.39 656092.03 N 70.25367180 W 148.73859939 BP _MWD+IFR+MS
8214.33 41.77 151.69 6727.39 6807.46 3670.63 3804.06 -3407.61 1655.76 0.65 ·0.04 -0.97 5943892.29 656123.15 N 70.25351682 W 148.73835739 BP _MWD+IFR+MS
8310.06 43.22 151.70 6797.97 6878.04 3733.89 3868.73 -3464.54 1686.43 1.51 1.51 0.01 5943836.00 656154.97 N 70.25336126 W 148.73810974 BP _MWD+IFR+MS
8406.16 43.89 152.22 6867.62 6947.69 3798.61 3934.94 -3522.99 1717.55 0.79 0.70 0.54 5943778.21 656187.29 N 70.25320157 W 148.73785836 BP _MWD+IFR+MS
8501.93 42.95 158.43 6937.21 7017 .28 3861.96 4000.74 -3582.73 1745.03 4.56 ·0.98 6.48 5943719.05 656215.98 N 70.25303834 W 148.73763644 BP _MWD+IFR+MS
8597.09 44.08 158.13 7006.22 7086.29 3924.09 4066.26 -3643.60 1769.28 1.21 1.19 -0.32 5943658.70 656241.47 N 70.25287204 W 148.73744063 BP_MWD.S
8693.56 45.79 159.35 7074.51 7154.58 3988.51 4134.39 -3707.10 1793.98 1.98 1.77 1.26 5943595.72 656267.46 N 70.25269855 W 148.73724123 BP MWD S
8788.59 44.13 158.22 7141.75 7221.82 4051.98 4201.54 -3769.70 1818.27 1.94 -1.75 -1.19 5943533.64 656293.03 N 70.25252752 W 148.73704512 BP _MWD+I +MS
8884.29 42.04 159.16 7211.64 7291.71 4113.81 4266.90 -3830.59 1842.03 2.28 -2.18 0.98 5943473.25 656318.04 N 70.25236114 W 148.73685323 BP _MWD+IFR+MS
8979.37 41.14 157.24 7282.75 7362.82 4173.67 4330.01 -3889.19 1865.46 1.64 -0.95 -2.02 5943415.15 656342.66 N 70.25220105 W 148.73666408 BP _MWD+IFR+MS
9075.49 39.43 158.22 7356.08 7436.15 4232.78 4392.16 -3946.69 1889.02 1.90 -1.78 1.02 5943358.14 656367.39 N 70.25204392 W 148.73647384 BP _MWD+IFR+MS
9171.06 37.72 154.61 7430.80 7510.87 4289.84 4451.74 -4001.30 1912.82 2.96 -1.79 -3.78 5943304.04 656392.30 N 70.25189473 W 148.73628166 BP _MWD+IFR+MS
9266.35 36.77 151.97 7506.66 7586.73 4345.89 4509.40 -4052.81 1938.72 1.95 -1.00 -2.77 5943253.07 656419.26 N 70.25175398 W 148.73607249 BP _MWD+IFR+MS
9362.56 36.16 151.55 7584.03 7664.10 4401.82 4566.58 -4103.19 1965.78 0.69 -0.63 -0.44 5943203.27 656447.34 N 70.25161634 W 148.73585402 BP _MWD+IFR+MS
9460.01 37.01 148.90 7662.29 7742.36 4458.93 4624.66 -4153.58 1994.62 1.84 0.87 -2.72 5943153.48 656477.21 N 70.25147864 W 148.73562106 BP _MWD+IFR+MS
9555.84 36.88 149.55 7738.88 7818.95 4515.74 4682.25 -4203.07 2024.10 0.43 -0.14 0.68 5943104.61 656507.69 N 70.25134342 W 148.73538307 BP _MWD+IFR+MS
9649.45 36.84 147.77 7813.78 7893.85 4571.21 4738.40 -4251.03 2053.30 1.14 -0.04 -1.90 5943057.27 656537.87 N 70.25121239 W 148.73514725 BP _MWD+IFR+MS
9742.08 37.03 147.75 7887.82 7967.89 4626.33 4794.07 -4298.11 2082.99 0.21 0.21 -0.02 5943010.81 656568.52 N 70.25108375 W 148.73490746 BP _MWD+IFR+MS
9841.56 37.29 148.13 7967.10 8047.17 4685.80 4854.16 -4349.03 2114.89 0.35 0.26 0.38 5942960.55 656601.45 N 70.25094460 W 148.73464990 BP _MWD+IFR+MS
9937.09 36.00 144.43 8043.75 8123.82 4742.42 4911.16 -4396.45 2146.50 2.68 ·1.35 ·3.87 5942913.79 656634.03 N 70.25081502 W 148.73439459 BP _MWD+IFR+MS
10033.35 35.80 148.15 8121.74 8201.81 4798.48 4967.59 -4443.39 2177.82 2.28 -0.21 3.86 5942867.51 656666.30 N 70.25068678 W 148.73414170 BP _MWD+IFR+MS
10128.66 36.02 147.73 8198.93 8279.00 4853.81 5023.49 -4490.76 2207.49 0.35 0.23 -0.44 5942820.76 656696.93 N 70.25055733 W 148.73390209 BP _MWD+IFR+MS
10224.50 36.02 148.17 8276.45 8356.52 4909.59 5079.85 -4538.53 2237.40 0.27 0.00 0.46 5942773.62 656727.81 N 70.25042680 W 148.73366059 BP _MWD+IFR+MS
10319.82 36.07 149.30 8353.52 8433.59 4964.99 5135.94 -4586.47 2266.51 0.70 0.05 1.19 5942726.29 656757.89 N 70.25029581 W 148.73342556 BP _MWD+IFR+MS
10415.28 36.35 146.87 8430.55 8510.62 5020.78 5192.33 -4634.33 2296.32 1.53 0.29 ·2.55 5942679.05 656788.68 N 70.25016504 W 148.73318485 BP_MWD+IFR+MS
10510.39 34.95 145.87 8507.83 8587.90 5075.84 5247.76 -4680.49 2327.01 1.59 -1.47 -1.05 5942633.54 656820.31 N 70.25003892 W 148.73293702 BP _MWD+I.
10606.72 34.47 146.55 8587.02 8667.09 5130.34 5302.61 -4726.07 2357.52 0.64 -0.50 0.71 5942588.59 656851.74 N 70.24991435 W 148.73269069 BP MWD+I
10702.48 34.19 145.75 8666.10 8746.17 5184.01 5356.61 -4770.92 2387.60 0.55 -0.29 -0.84 5942544.37 656882.73 N 70.24979180 W 148.73244780 BP _MWD+IF S
10729.73 34.12 143.81 8688.65 8768.72 5199.25 5371.91 -4783.42 2396.42 4.01 -0.26 -7.12 5942532.06 656891 .81 N 70.24975765 W 148.73237657 BP _MWD+IFR+MS
10797.00 34.12 143.81 8744.34 8824.41 5236.89 5409.64 -4813.87 2418.70 0.00 0.00 0.00 5942502.07 656914.71 N 70.24967443 W 148.73219666 BP _MWD+IFR+MS
10807.69 35.89 145.78 8753.10 8833.17 5242.99 5415.78 -4818.89 2422.24 19.64 16.56 18.43 5942497.13 656918.34 N 70.24966074 W 148.73216813 BP _MWD+IFR+MS
10838.19 42.15 147.16 8776.78 8856.85 5262.05 5434.97 -4834.89 2432.82 20.72 20.52 4.52 5942481.35 656929.25 N 70.24961700 W 148.73208264 BP _MWD+IFR+MS
10873.40 49.87 147.33 8801.22 8881 .29 5287.15 5460.28 -4856.18 2446.52 21.93 21.93 0.48 5942460.35 656943.38 N 70.24955883 W 148.73197208 BP _MWD+IFR+MS
1 0902.84 55.46 148.24 8819.07 8899.14 5310.32 5483.68 -4875.98 2458.99 19.15 18.99 3.09 5942440.81 656956.25 N 70.24950473 W 148.73187142 BP_MWD+IFR+MS
10934.02 62.91 147.48 8835.03 8915.10 5336.81 5510.44 -4898.64 2473.23 23.99 23.89 -2.44 5942418.45 656970.95 N 70.24944282 W 148.73175643 BP _MWD+IFR+MS
10967.11 70.53 145.76 8848.10 8928.17 5366.96 5540.81 -4923.99 2489.95 23.52 23.03 -5.20 5942393.45 656988.19 N 70.24937354 W 148.73162142 BP _MWD+IFR+MS
10998.98 76.64 142.50 8857.10 8937.17 5397.43 5571.37 -4948.74 2507.86 21.53 19.17 -10.23 5942369.07 657006.60 N 70.24930591 W 148.73147678 BP _MWD+IFR+MS
11016.66 80.04 139.89 8860.67 8940.74 5414.73 5588.68 -4962.23 2518.71 24.06 19.23 ·14.76 5942355.81 657017.73 N 70.24926905 W 148.73138917 BP _MWD+IFR+MS
11029.44 82.67 137.69 8862.59 8942.66 5427.36 5601 .32 -4971 .73 2527.03 26.70 20.58 -17.21 5942346.48 657026.24 N 70.24924308 W 148.73132196 BP _MWD+IFR+MS
11060.98 89.43 136.19 8864.77 8944.84 5458.77 5632.76 -4994.71 2548.51 21.95 21.43 -4.76 5942323.95 657048.18 N 70.24918029 W 148.73114858 BP _MWD+IFR+MS
11094.64 88.60 136.78 8865.34 8945.41 5492.37 5666.42 ·5019.11 2571.68 3.03 -2.47 1.75 5942300.03 657071 .85 N 70.24911360 W 148.73096146 BP _MWD+IFR+MS
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) A-301A-30IA·30APB11A-30APB1 Generated 8/5/2004 2:38 PM Page 3 of 4
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Lattlude Longitude Survey Tdol
Depth Section Departure Model
(II) (dog ) (dog ) (II) (II) (II) (II) (II) (II) (degl100ll) (degI1001l) (degl100ll) (IIUS) (IIUS)
11124.52 87.78 137.47 8866.29 8946.36 5522.21 5696.28 -5041.00 2592.00 3.59 -2.74 2.31 5942278.57 657092.61 N 70.24905379 W 148.73079737 BP _MWD+IFR+MS
11158.09 87.61 137.15 8867.64 8947.71 5555.72 5729.82 ·5065.65 2614.74 1.08 -0.51 -0.95 5942254.38 657115.85 N 70.24898641 W 148.73061372 BP _MWD+IFR+MS
11189.62 87.16 137.75 8869.08 8949.15 5587.19 5761.32 -5088.86 2636.04 2.38 -1.43 1.90 5942231.62 657137.62 N 70.24892300 W 148.73044173 BP _MWD+IFR+MS
11220.94 86.82 137.82 8870.72 8950.79 5618.45 5792.60 -5112.02 2657.06 1.11 -1.09 0.22 5942208.90 657159.10 N 70.24885970 W 148.73027204 BP _MWD+IFR+MS
11253.30 86.18 138.47 8872.70 8952.77 5650.73 5824.90 -5136.08 2678.61 2.82 -1.98 2.01 5942185.29 657181.14 N 70.24879395 W 148.73009801 BP _MWD+IFR+MS
11284.87 86.15 138.83 8874.81 8954.88 5682.23 5856.40 -5159.72 2699.42 1.14 -0.10 1.14 5942162.07 657202.43 N 70.24872933 W 148.72992998 BP _MWD+IFR+MS
11315.54 88.18 139.05 8876.33 8956.40 5712.86 5887.03 -5182.82 2719.54 6.66 6.62 0.72 5942139.40 657223.02 N 70.24866621 W 148.72976752 BP _MWD+IFR+MS
11350.29 89.32 139.34 8877.08 8957.15 5747.60 5921.77 -5209.12 2742.24 3.38 3.28 0.83 5942113.57 657246.26 N 70.24859435 W 148.72958421 BP _MWD+IFR+MS
11382.26 89.94 140.74 8877.29 8957.36 5779.56 5953.74 -5233.62 2762.77 4.79 1.94 4.38 5942089.50 657267.28 N 70.24852739 W 148.72941843 BP _MWD+IFR+MS
11411.69 91.59 140.89 8876.90 8956.97 5808.99 5983.16 -5256.43 2781.37 5.63 5.61 0.51 5942067.08 657286.34 N 70.24846506 W 148.72926831 BP _MWD+IFR+MS
11445.37 93.37 140.76 8875.44 8955.51 5842.63 6016.81 -5282.51 2802.62 5.30 5.29 -0.39 5942041 .44 657308.12 N 70.24839378 W 148.72909670 BP _MWD+IFR+MS
11475.18 93.41 139.56 8873.68 8953.75 5872.38 6046.57 -5305.36 2821.68 4.02 0.13 -4.03 5942018.99 657327.65 N 70.24833134 W 148.72894278 BP _MWD+IFR+MS
11506.44 92.65 140.26 8872.03 8952.10 5903.60 6077.79 -5329.24 2841.79 3.30 -2.43 2.24 5941995.52 657348.24 N 70.24826607 W 148.72878046 BP _MWD+.S
11541.10 92.86 140.28 8870.36 8950.43 5938.22 6112.40 -5355.87 2863.91 0.61 0.61 0.06 5941969.36 657370.90 N 70.24819331 W 148.72860181 BP MWD+ S
11572.70 94.28 139.43 8868.39 8948.46 5969.75 6143.94 -5379.98 2884.25 5.23 4.49 -2.69 5941945.68 657391.72 N 70.24812743 W 148.72843764 BP _MWD+I +MS
11601.27 94.85 136.82 8866.12 8946.19 5998.22 6172.42 -5401.18 2903.25 9.32 2.00 -9.14 5941924.87 657411.16 N 70.24806948 W 148.72828416 BP _MWD+IFR+MS
11634.84 94.93 133.62 8863.25 8943.32 6031.56 6205.87 -5424.92 2926.81 9.50 0.24 -9.53 5941901.62 657435.20 N 70.24800461 W 148.72809395 BP _MWD+IFR+MS
11666.38 94.54 132.08 8860.65 8940.72 6062.76 6237.30 -5446.30 2949.86 5.02 -1.24 -4.88 5941880.72 657458.67 N 70.24794618 W 148.72790788 BP _MWD+IFR+MS
11698.90 93.90 132.77 8858.26 8938.33 6094.93 6269.73 -5468.17 2973.80 2.89 -1.97 2.12 5941859.34 657483.06 N 70.24788638 W 148.72771458 BP _MWD+IFR+MS
11732.39 93.67 132.71 8856.05 8936.12 6128.10 6303.15 -5490.85 2998.34 0.71 -0.69 -0.18 5941837.17 657508.06 N 70.24782440 W 148.72751641 BP _MWD+IFR+MS
11764.54 93.34 131.76 8854.08 8934.15 6159.91 6335.24 -5512.42 3022.10 3.12 -1.03 -2.95 5941816.09 657532.25 N 70.24776545 W 148.72732456 BP _MWD+IFR+MS
11795.28 92.79 133.34 8852.44 8932.51 6190.36 6365.94 -5533.18 3044.71 5.44 -1.79 5.14 5941795.81 657555.28 N 70.24770872 W 148.72714198 BP _MWD+IFR+MS
11826.86 93.68 133.75 8850.66 8930.73 6221.71 6397.47 -5554.90 3067.56 3.10 2.82 1.30 5941774.56 657578.58 N 70.24764935 W 148.72695745 BP _MWD+IFR+MS
11860.38 94.38 131.94 8848.30 8928.37 6254.90 6430.90 -5577.64 3092.08 5.78 2.09 -5.40 5941752.33 657603.55 N 70.24758721 W 148.72675951 BP _MWD+IFR+MS
11889.84 94.03 132.49 8846.14 8926.21 6284.03 6460.28 -5597.38 3113.84 2.21 -1.19 1.87 5941733.04 657625.71 N 70.24753325 W 148.72658381 BP _MWD+IFR+MS
11923.21 93.14 130.90 8844.05 8924.12 6317.00 6493.59 -5619.53 3138.71 5.45 -2.67 -4.76 5941711.41 657651 .02 N 70.24747271 W 148.72638302 BP _MWD+IFR+MS
11955.35 91.47 129.05 8842.76 8922.83 6348.65 6525.70 -5640.16 3163.31 7.75 -5.20 -5.76 5941691.29 657676.05 N 70.24741632 W 148.72618432 BP _MWD+IFR+MS
Last MWD+IFR+MS 11987.15 92.17 126.98 8841.75 8921.82 6379.77 6557.48 -5659.74 3188.35 6.87 2.20 -6.51 5941672.23 657701.48 N 70.24736281 W 148.72598213 BP_MWD+IFR+MS
TO (Projected) 12139.00 92.50 115.00 8835.54 8915.61 6523.17 6709.21 -5737.72 3318.18 7.89 0.22 -7.89 5941596.94 657832.87 N 70.24714963 W 148.72493375 BP _BLIND
Survey Type: Definitive Survey
NOTES: BOSS_GYRO - (Sperry Sun BOSS Gyro multi-shot)
MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. )
Leqal Description: e
Northinq (V) [ftUS] Eastinq (X) [ftUS]
Surface: 2098 FSL 1014 FEL S35 T11N R13E UM 5947264.98 654397.99
Tie-In: 2098 FSL 1014 FEL S35 T11 N R13E UM 5947264.59 654397.86
BHL: 1640 FSL 2980 FEL S1 T10N R13E UM 5941596.94 657832.87
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-301A-30APB1IA-30APB1
Generated 8/5/2004 2:38 PM Page 4 of 4
A-30APB2 Survey Report hlumber r
Report Date: 27 ·Jun·Q4 Survey J DLS Computation Method: Minimum Curvature J Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 139.750'
Field: Prudhoe Bay Unit· WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure J Slot: A·PAD J A-30 TVD Reference Datum: Rotary Table
Well: A·30 TVD Reference Elevation: 80.07 ft relative to MSL
Borehole: A·30APB2 Sea Bed J Ground Level Elevation: 51.37 ft relative to MSL
UWUAPI#: 500292137271 Magnetic Declination: 25.170'
Survey Name J Date: A·30APB2 J June 27, 2004 Total Field Strength: 57588.909 nT
Tort J AHD J DDI J ERD ratio: 339.277' /7507.25 ftJ 6.566/ 0.842 Magnetic Dip: 80.834'
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: June 23, 2004
Location Latilong: N 70.26282668, W 148.75173554 Magnetic Declination Model: BGGM 2003
Location Grid NJE YJX: N 5947264.980 ftUS, E 654397.990 ftUS North Reference: True North
Grid Convergence Angle: +1.17495222' Total Carr Mag North .> True North: +25.170' e
Grid Scale Factor: 0.99992708 Local Coordinates Referenced To: Well Head
I Comments Measured I Inclination I Azimuth I Sub·Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Lamude Longitude Survey Tool
Depth Section Departure Model
(II) (deg) (deg) (II) (II) (II) (II) (II) (II) (degJ1001l) (degJ100Il) (degJ1001l) (IIUS) (IIUS)
Projected·Up 0.00 0.00 199.60 ·80.07 0.00 0.21 0.00 ·0.39 -0.14 0.00 0.00 0.00 5947264.59 654397.86 N 70.26282563 W 148.75173666
99.17 0.47 199.60 19.10 99.17 0.41 0.41 -0.77 -0.28 0.47 0.47 0.00 5947264.20 654397.73 N 70.26282457 W 148.75173777 BP _BOSS_GYRO
199.17 0.45 222.00 119.09 199.16 0.67 1.20 ·1.45 -0.68 0.18 ·0.02 22.40 5947263.52 654397.34 N 70.26282272 W 148.75174100 BP _BOSS_GYRO
299.17 0.47 205.19 219.09 299.16 0.89 2.00 -2.11 -1.11 0.14 0.02 ·16.81 5947262.84 654396.92 N 70.26282091 W 148.75174454 BP _BOSS_GYRO
399.17 0.80 209.10 319.09 399.16 1.31 3.11 -3.10 -1.63 0.33 0.33 3.91 5947261.85 654396.43 N 70.26281823 W 148.75174870 BP_BOSS_GYRO
499.17 0.55 195.50 419.08 499.15 1.83 4.28 -4.17 -2.09 0.30 -0.25 ·13.60 5947260.77 654395.98 N 70.26281530 W 148.75175248 BP _BOSS_GYRO
599.17 0.55 215.00 519.07 599.14 2.22 5.23 -5.02 -2.50 0.19 0.00 19.50 5947259.91 654395.60 N 70.26281296 W 148.75175574 BP _BOSS_GYRO
699.17 0.50 212.50 619.07 699.14 2.47 6.15 -5.78 -3.01 0.05 -0.05 -2.50 5947259.14 654395.10 N 70.26281088 W 148.75175986 BP _BOSS_GYRO
799.17 0.45 191.19 719.07 799.14 2.85 6.97 -6.54 -3.32 0.18 -0.05 -21.31 5947258.38 654394.81 N 70.26280882 W 148.75176237 BP _BOSS_GYRO
899.17 0.25 186.50 819.06 899.13 3.24 7.58 -7.14 -3.42 0.20 -0.20 -4.69 5947257.77 654394.72 N 70.26280718 W 148.75176319 BP _BOSS_GYRO
999.17 0.25 263.80 919.06 999.13 3.27 7.95 -7.38 -3.66 0.31 0.00 77.30 5947257.53 654394.48 N 70.26280652 W 148.75176514 BP _BOSS_GYRO
1099.17 0.37 232.50 1019.06 1099.13 3.13 8.48 -7.60 -4.13 0.20 0.12 ·31.30 5947257.30 654394.01 N 70.26280592 W 148.75176896 BP _BOSS_GYRO
1199.17 0.50 212.69 1119.06 1199.13 3.24 9.23 -8.16 -4.63 0.20 0.13 -19.81 5947256.72 654393.53 N 70.26280438 W 148.75177294 BP _BOSS_GYRO
1299.17 0.40 202.39 1219.06 1299.13 3.53 10.01 -8.85 -4.99 0.13 -0.10 -10.30 5947256.03 654393.18 N 70.26280249 W 148.75177592 BP _BOSS_GYRO
1399.17 0.33 226.80 1319.05 1399.12 3.71 10.64 -9.37 -5.34 0.17 -0.07 24.41 5947255.50 654392.85 N 70.26280107 W 148.75177869 BP _BOSS_GYRO
1499.17 0.47 221.50 1419.05 1499.12 3.78 11.34 -9.88 -5.82 0.14 0.14 -5.30 5947254.99 654392.37 N 70.26279970 W 148.75178258 BP_BOSS_cAt
1599.17 0.55 217.19 1519.05 1599.12 3.94 12.23 -10.57 -6.38 0.09 0.08 ·4.31 5947254.28 654391.83 N 70.26279781 W 148.75178712 BP _BOSS_GYRO
1699.17 0.55 209.10 1619.04 1699.11 4.22 13.19 -11.37 -6.90 0.08 0.00 -8.09 5947253.47 654391.32 N 70.26279562 W 148.75179136 BP_BOSS_GYRO
1799.17 1.38 173.11 1719.03 1799.10 5.39 14.83 -12.98 -6.99 0.99 0.83 -35.99 5947251.86 654391.26 N 70.26279121 W 148.75179208 BP _BOSS_GYRO
1899.17 3.00 163.70 1818.95 1899.02 8.79 18.64 -16.69 -6.11 1.65 1.62 ·9.41 5947248.17 654392.22 N70.26278108 W 148.75178497 BP_BOSS_GYRO
1999.17 5.30 160.61 1918.68 1998.75 15.50 25.87 -23.56 -3.85 2.31 2.30 -3.09 5947241.35 654394.63 N 70.26276232 W 148.75176664 BP _BOSS_GYRO
2099.17 8.00 156.11 2018.00 2098.07 26.49 37.45 -34.28 0.51 2.75 2.70 -4.50 5947230.72 654399.20 N 70.26273303 W 148.75173146 BP _BOSS_GYRO
2199.17 10.00 152.11 2116.77 2196.84 41.65 53.08 -48.32 7.39 2.09 2.00 -4.00 5947216.83 654406.36 N 70.26269468 W 148.75167584 BP _BOSS_GYRO
2299.17 13.18 148.20 2214.72 2294.79 61.41 73.17 -65.69 17.46 3.27 3.18 -3.91 5947199.67 654416.79 N 70.26264723 W 148.75159443 BP _BOSS_GYRO
2399.17 17.68 147.81 2311.09 2391.16 87.74 99.76 -88.24 31.56 4.50 4.50 -0.39 5947177.41 654431.35 N 70.26258562 W 148.75148042 BP _BOSS_GYRO
2499.17 19.57 148.61 2405.85 2485.92 119.33 131.70 -115.39 48.38 1.91 1.89 0.80 5947150.62 654448.72 N 70.26251145 W 148.75134450 BP _BOSS_GYRO
2599.17 20.82 151.40 2499.70 2579.77 153.28 166.21 -145.29 65.61 1.58 1.25 2.79 5947121.08 654466.56 N 70.26242975 W 148.75120522 BP _BOSS_GYRO
2699.17 21.22 152.31 2593.05 2673.12 188.35 202.08 -176.92 82.53 0.52 0.40 0.91 5947089.80 654484.12 N 70.26234335 W 148.75106848 BP _BOSS_GYRO
2799.17 21.60 152.11 2686.14 2766.21 224.00 238.59 -209.21 99.54 0.39 0.38 -0.20 5947057.87 654501.80 N 70.26225512 W 148.75093091 BP _BOSS_GYRO
2899.17 22.55 150.81 2778.81 2858.88 260.80 276.17 -242.22 117.51 1.07 0.95 -1.30 5947025.24 654520.43 N 70.26216495 W 148.75078572 BP _BOSS_GYRO
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-30IA-30APB21A-30APB2
Generated 8/5/2004 2:39 PM Page 1 of 5
, .
Comments Measured I Inclination I Azimuth I Sub·Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longnude Survey Tool
Depth Section Departure Model
(It) (deg) (deg) (It) (It) (It) (It) (It) (It) (deg/100 It) (deg1100 It) (deg/100 It) (ltUS) (ltUS)
2999.17 24.12 149.70 2870.63 2950.70 299.74 315.78 -276.60 137.17 1.63 1.57 -1.11 5946991 .27 654540.79 N 70.26207101 W 148.75062680 BP _BOSS_GYRO
3099.17 25.82 150.31 2961 .28 3041.35 341.28 357.99 -313.17 158.27 1.72 1.70 0.61 5946955.15 654562.63 N 70.26197113 W 148.75045628 BP _BOSS_GYRO
3199.17 27.83 149.40 3050.52 3130.59 385.70 403.11 -352.18 180.94 2.05 2.01 -0.91 5946916.61 654586.10 N 70.26186454 W 148.75027303 BP _BOSS_GYRO
3299.17 31.20 145.00 3137.54 3217.61 434.53 452.35 ·393.51 207.69 4.00 3.37 -4.40 5946875.84 654613.69 N 70.26175164 W 148.75005682 BP _BOSS_GYRO
3399.17 33.07 144.81 3222.21 3302.28 487.50 505.54 -437.03 238.27 1.87 1.87 -0.19 5946832.96 654645.15 N 70.26163275 W 148.74980964 BP _BOSS_GYRO
Tie-In Survey 3399.19 33.07 144.81 3222.23 3302.30 487.51 505.55 -437.03 238.27 0.00 0.00 0.00 5946832.96 654645.16 N 70.26163272 W 148.74980959 BP _BOSS_GYRO
Top Window 3446.00 34.28 144.91 3261.18 3341.25 513.36 531.51 -458.26 253.21 2.59 2.58 0.21 5946812.04 654660.53 N 70.26157474 W 148.74968885 BP _BLIND
Base Window 3462.00 35.77 147.02 3274.29 3354.36 522.49 540.69 -465.87 258.35 12.00 9.31 13.19 5946804.54 654665.82 N 70.26155395 W 148.74964733 BP _BLIND
Blind survey 3474.00 35.77 147.02 3284.02 3364.09 529.45 547.70 -471.75 262.17 0.00 0.00 0.00 5946798.74 654669.76 N 70.26153787 W 148.74961647 BP _BLIND
First MWD+IFR+MS 3527.08 38.45 149.64 3326.35 3406.42 561.10 579.72 -499.01 278.96 5.86 5.05 4.94 5946771 .83 654687.10 N 70.26146339 W 148.74948077 BP _MWD+IFR+MS
3621.83 43.30 159.69 3398.05 3478.12 620.77 641.62 -555.00 305.17 8.61 5.12 10.61 5946716.40 654714.45 N 70.26131044 W 148.74926892 BP _MWD+IFR+MS
3718.63 43.67 163.56 3468.30 3548.37 682.56 708.22 -618.19 326.15 2.78 0.38 4.00 5946653.65 654736.73 N 70.26113780 W 148.74909934 BP _MWD+.S
3813.92 43.65 155.57 3537.29 3617.36 744.35 773.95 -679.74 349.08 5.79 ·0.02 -8.38 5946592.59 654760.91 N 70.26096966 W 148.74891402 BP _MWD+ S
3910.27 43.54 153.24 3607.07 3687.14 808.62 840.38 -739.65 377.78 1.67 -0.11 -2.42 5946533.29 654790.83 N 70.26080598 W 148.74868210 BP_MWD+ S
4005.51 42.92 156.24 3676.47 3756.54 871.62 905.61 -798.63 405.62 2.25 -0.65 3.15 5946474.90 654819.87 N 70.26064486 W 148.74845712 BP _MWD+IFR+MS
4100.45 42.26 156.44 3746.37 3826.44 933.19 969.86 -857.48 431 .40 0.71 -0.70 0.21 5946416.59 654846.85 N 70.26048408 W 148.74824874 BP _MWD+IFR+MS
4196.49 43.37 157.38 3816.82 3896.89 995.56 1035.13 -917.52 456.99 1.33 1.16 0.98 5946357.09 654873.67 N 70.26032004 W 148.74804192 BP _MWD+IFR+MS
4293.03 43.10 156.98 3887.15 3967.22 1058.65 1101.26 -978.47 482.64 0.40 -0.28 -0.41 5946296.68 654900.56 N 70.26015352 W 148.74783466 BP _MWD+IFR+MS
4387.20 44.06 155.31 3955.37 4035.44 1120.92 1166.17 -1037.83 508.90 1.59 1.02 -1.77 5946237.88 654928.03 N 70.25999134 W 148.74762246 BP _MWD+IFR+MS
4483.97 43.23 156.12 4025.40 4105.47 1185.14 1232.96 -1098.71 536.37 1.03 -0.86 0.84 5946177.58 654956.74 N 70.25982502 W 148.74740046 BP _MWD+IFR+MS
4579.76 43.99 156.79 4094.76 4174.83 1248.42 1299.03 -1159.28 562.76 0.93 0.79 0.70 5946117.57 654984.36 N 70.25965954 W 148.74718720 BP _MWD+IFR+MS
4675.82 43.98 155.63 4163.87 4243.94 1312.39 1365.74 -1220.32 589.67 0.84 -0.01 -1.21 5946057.10 655012.52 N 70.25949278 W 148.74696976 BP _MWD+IFR+MS
4770.96 43.07 154.85 4232.86 4312.93 1375.53 1431.26 -1279.82 617.11 1.11 -0.96 -0.82 5945998.18 655041.16 N 70.25933023 W 148.74674805 BP _MWD+IFR+MS
4866.63 44.11 158.69 4302.16 4382.23 1438.57 1497.21 -1340.42 643.10 2.97 1.09 4.01 5945938.13 655068.39 N 70.25916467 W 148.74653806 BP _MWD+IFR+MS
4962.36 43.31 158.86 4371.36 4451 .43 1501.11 1563.36 -1402.08 667.05 0.84 -0.84 0.18 5945876.98 655093.59 N 70.25899621 W 148.74634455 BP _MWD+IFR+MS
5057.71 44.25 159.71 4440.20 4520.27 1563.28 1629.33 -1463.79 690.38 1.16 0.99 0.89 5945815.77 655118.18 N 70.25882762 W 148.74615603 BP _MWD+IFR+MS
5153.11 43.97 159.36 4508.70 4588.77 1625.76 1695.73 -1526.00 713.59 0.39 -0.29 -0.37 5945754.05 655142.67 N 70.25865766 W 148.74596845 BP _MWD+IFR+MS
5249.30 44.35 158.18 4577.71 4657.78 1689.11 1762.74 -1588.46 737.86 0.94 0.40 -1.23 5945692.1 0 655168.21 N 70.25848702 W 148.74577238 BP _MWD+IFR+MS
5344.71 43.57 155.57 4646.39 4726.46 1752.39 1828.96 -1649.36 763.86 2.07 -0.82 -2.74 5945631 .75 655195.45 N 70.25832063 W 148.74556234 BP _MWD+IFR+MS
5439.95 44.88 158.55 4714.65 4794.72 1815.79 1895.38 -1710.53 789.72 2.58 1.38 3.13 5945571.13 655222.56 N 70.25815352 W 148.74535335 BP _MWD+IFR+MS
5535.36 44.55 156.22 4782.45 4862.52 1879.75 1962.51 -1772.49 815.53 1.75 -0.35 -2.44 5945509.72 655249.63 N 70.25798424 W 148.74514485 BP _MWD+IFR+MS
5631.47 43.62 156.08 4851.49 4931.56 1943.90 2029.37 -1833.64 842.56 0.97 -0.97 -0.15 5945449.14 655277.91 N70.25781716 W 148.74492641 BP_MWD+I.
5726.11 43.66 157.91 4919.98 5000.05 2006.27 2094.68 -1893.76 868.09 1.34 0.04 1.93 5945389.56 655304.66 N 70.25765293 W 148.74472021 BP _MWD+I
5822.15 44.66 160.52 4988.88 5068.95 2069.34 2161.58 -1956.30 891.81 2.16 1.04 2.72 5945327.52 655329.66 N 70.25748205 W 148.74452853 BP _MWD+I
5917.24 45.12 159.59 5056.25 5136.32 2132.27 2228.69 ·2019.39 914.71 0.84 0.48 ·0.98 5945264.93 655353.84 N 70.25730970 W 148.74434358 BP _MWD+IFR+MS
6013.41 45.16 155.70 5124.10 5204.17 2197.12 2296.85 -2082.41 940.62 2.87 0.04 -4.04 5945202.45 655381.04 N 70.25713752 W 148.74413419 BP _MWD+IFR+MS
6109.21 44.98 157.32 5191.76 5271.83 2262.06 2364.67 -2144.60 967.66 1.21 -0.19 1.69 5945140.83 655409.34 N 70.25696759 W 148.74391580 BP _MWD+IFR+MS
6205.94 44.84 156.49 5260.27 5340.34 2327.31 2432.96 -2207.42 994.44 0.62 -0.14 -0.86 5945078.58 655437.41 N 70.25679597 W 148.74369940 BP_MWD+IFR+MS
6301 .09 45.05 153.08 5327.62 5407.69 2392.21 2500.16 -2268.21 1023.07 2.54 0.22 -3.58 5945018.39 655467.28 N 70.25662988 W 148.74346810 BP _MWD+fFR+MS
6396.14 45.54 154.97 5394.49 5474.56 2457.67 2567.72 -2328.94 1052.66 1.50 0.52 1.99 5944958.29 655498.10 N 70.25646396 W 148.74322913 BP _MWD+IFR+MS
6491.71 44.68 151.80 5461.95 5542.02 2523.45 2635.42 -2389.46 1082.97 2.52 -0.90 -3.32 5944898.40 655529.64 N 70.25629861 W 148.74298425 BP _MWD+IFR+MS
6586.77 44.05 149.76 5529.91 5609.98 2588.68 2701.88 -2447.47 1115.41 1.64 -0.66 -2.15 5944841 .08 655563.26 N 70.25614012 W 148.74272219 BP _MWD+IFR+MS
6683.47 43.68 150.27 5599.63 5679.70 2654.62 2768.89 ·2505.51 1148.90 0.53 -0.38 0.53 5944783.74 655597.93 N 70.25598155 W 148.74245164 BP _MWD+IFR+MS
6779.05 43.12 151.48 5669.07 5749.14 2719.05 2834.56 -2562.88 1180.86 1.05 -0.59 1.27 5944727.05 655631.06 N 70.25582482 W 148.74219341 BP _MWD+IFR+MS
6875.65 42.35 149.72 5740.03 5820.10 2783.43 2900.11 -2619.99 1213.03 1.47 -0.80 -1.82 5944670.61 655664.40 N 70.25566879 W 148.74193352 BP _MWD+IFR+MS
6971.04 42.91 147.76 5810.21 5890.28 2847.23 2964.71 -2675.20 1246.56 1.51 0.59 -2.05 5944616.10 655699.05 N 70.25551792 W 148.74166268 BP _MWD+IFR+MS
7065.64 42.59 149.88 5879.68 5959.75 2910.64 3028.92 -2730.13 1279.80 1.56 -0.34 2.24 5944561.87 655733.41 N 70.25536784 W 148.74139412 BP_MWD+IFR+MS
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) A-301A-301A-30APB2IA-30APB2 Generated 8/5/2004 2:39 PM Page 2 of 5
..
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latitude Longitude Survey Tool
Depth Section Departure Model
(It) (deg) (deg) (It) (It) (It) (It) (It) (It) (degl100lt) (degl100ft) (deg/I00It) (ltUS) (ltUS)
7162.37 42.28 147.82 5951.08 6031.15 2975.08 3094.19 -2785.99 1313.56 1.47 -0.32 -2.13 5944506.72 655768.30 N 70.25521524 W 148.74112144 BP _MWD+IFR+MS
7257.24 42.74 147.79 6021.01 6101.08 3038.55 3158.29 -2840.23 1347.71 0.49 0.48 -0.03 5944453.19 655803.56 N 70.25506702 W 148.74084552 BP _MWD+JFR+MS
7353.47 42.30 149.20 6091.94 6172.01 3102.83 3223.33 -2895.68 1381.70 1.09 -0.46 1.47 5944398.46 655838.67 N 70.25491553 W 148.74057098 BP _MWD+IFR+MS
7449.46 42.30 151.50 6162.94 6243.01 3166.32 3287.92 -2951.81 1413.66 1.61 0.00 2.40 5944342.99 655871.77 N 70.25476216 W 148.74031286 BP _MWD+IFR+MS
7544.75 42.34 151.07 6233.40 6313.47 3229.18 3352.08 -3008.08 1444.48 0.31 0.04 -0.45 5944287.37 655903.74 N 70.25460842 W 148.74006388 BP _MWD+IFR+MS
7640.53 42.78 151.72 6303.95 6384.02 3292.63 3416.86 -3064.95 1475.49 0.65 0.46 0.68 5944231.15 655935.91 N 70.25445303 W 148.73981338 BP_MWD+IFR+MS
7735.81 43.13 151.19 6373.68 6453.75 3356.20 3481.79 -3121.99 1506.52 0.53 0.37 -0.56 5944174.77 655968.09 N 70.25429720 W 148.73956278 BP _MWD+IFR+MS
7831.03 42.80 153.47 6443.36 6523.43 3419.53 3546.68 -3179.45 1536.66 1.67 -0.35 2.39 5944117.94 655999.40 N 70.25414019 W 148.73931937 BP _MWD+IFR+MS
7926.86 42.08 152.54 6514.09 6594.16 3482.47 3611.35 -3237.08 1566.01 1.00 -0.75 -0.97 5944060.94 656029.92 N 70.25398276 W 148.73908232 BP _MWD+IFR+MS
8022.34 42.56 151.99 6584.68 6664.75 3545.23 3675.63 ·3293.97 1595.92 0.63 0.50 -0.58 5944004.67 656061.00 N 70.25382730 W 148.73884069 BP _MWD+IFR+MS
8118.06 41.81 152.62 6655.61 6735.68 3607.97 3739.91 -3350.88 1625.80 0.90 -0.78 0.66 5943948.39 656092.03 N 70.25367180 W 148.73859939 BP _MWD+IFR+MS
8214.33 41.77 151.69 6727.39 6807.46 3670.63 3804.06 -3407.61 1655.76 0.65 -0.04 -0.97 5943892.29 656123.15 N 70.25351682 W 148.73835739 BP _MWD+IFR+MS
8310.06 43.22 151.70 6797.97 6878.04 3733.89 3868.73 -3464.54 1686.43 1.51 1.51 0.01 5943836.00 656154.97 N 70.25336126 W 148.73810974 BP_MWD+.S
8406.16 43.89 152.22 6867.62 6947.69 3798.61 3934.94 -3522.99 1717.55 0.79 0.70 0.54 5943778.21 656187.29 N 70.25320157 W 148.73785836 BP _MWD+I S
8501.93 42.95 158.43 6937.21 7017.28 3861.96 4000.74 -3582.73 1745.03 4.56 -0.98 6.48 5943719.05 656215.98 N 70.25303834 W 148.73763644 BP _MWD+IFR+MS
8597.09 44.08 158.13 7006.22 7086.29 3924.09 4066.26 -3643.60 1769.28 1.21 1.19 -0.32 5943658.70 656241.47 N 70.25287204 W 148.73744063 BP _MWD+IFR+MS
8693.56 45.79 159.35 7074.51 7154.58 3988.51 4134.39 -3707.10 1793.98 1.98 1.77 1.26 5943595.72 656267.46 N 70.25269855 W 148.73724123 BP _MWD+IFR+MS
8788.59 44.13 158.22 7141.75 7221.82 4051.98 4201.54 -3769.70 1818.27 1.94 -1.75 -1.19 5943533.64 656293.03 N 70.25252752 W 148.73704512 BP _MWD+IFR+MS
8884.29 42.04 159.16 7211.64 7291.71 4113.81 4266.90 -3830.59 1842.03 2.28 -2.18 0.98 5943473.25 656318.04 N 70.25236114 W 148.73685323 BP _MWD+IFR+MS
8979.37 41.14 157.24 7282.75 7362.82 4173.67 4330.01 -3889.19 1865.46 1.64 -0.95 -2.02 5943415.15 656342.66 N 70.25220105 W 148.73666408 BP _MWD+IFR+MS
9075.49 39.43 158.22 7356.08 7436.15 4232.78 4392.16 -3946.69 1889.02 1.90 -1.78 1.02 5943358.14 656367.39 N 70.25204392 W 148.73647384 BP _MWD+IFR+MS
9171.06 37.72 154.61 7430.80 7510.87 4289.84 4451.74 -4001.30 1912.82 2.96 ·1.79 -3.78 5943304.04 656392.30 N 70.25189473 W 148.73628166 BP _MWD+IFR+MS
9266.35 36.77 151.97 7506.66 7586.73 4345.89 4509.40 -4052.81 1938.72 1.95 -1.00 -2.77 5943253.07 656419.26 N 70.25175398 W 148.73607249 BP _MWD+IFR+MS
9362.56 36.16 151.55 7584.03 7664.10 4401 .82 4566.58 -4103.19 1965.78 0.69 -0.63 -0.44 5943203.27 656447.34 N 70.25161634 W 148.73585402 BP _MWD+IFR+MS
9460.01 37.01 148.90 7662.29 7742.36 4458.93 4624.66 -4153.58 1994.62 1.84 0.87 -2.72 5943153.48 656477.21 N 70.25147864 W 148.73562106 BP _MWD+IFR+MS
9555.84 36.88 149.55 7738.88 7818.95 4515.74 4682.25 -4203.07 2024.10 0.43 -0.14 0.68 5943104.61 656507.69 N 70.25134342 W 148.73538307 BP _MWD+I FR+MS
9649.45 36.84 147.77 7813.78 7893.85 4571.21 4738.40 -4251.03 2053.30 1.14 -0.04 -1.90 5943057.27 656537.87 N 70.25121239 W 148.73514725 BP _MWD+IFR+MS
9742.08 37.03 147.75 7887.82 7967.89 4626.33 4794.07 -4298.11 2082.99 0.21 0.21 -0.02 5943010.81 656568.52 N 70.25108375 W 148.73490746 BP _MWD+IFR+MS
9841.56 37.29 148.13 7967.10 8047.17 4685.80 4854.16 -4349.03 2114.89 0.35 0.26 0.38 5942960.55 656601.45 N 70.25094460 W 148.73464990 BP _MWD+IFR+MS
9937.09 36.00 144.43 8043.75 8123.82 4742.42 4911.16 -4396.45 2146.50 2.68 -1.35 -3.87 5942913.79 656634.03 N 70.25081502 W 148.73439459 BP _MWD+IFR+MS
10033.35 35.80 148.15 8121.74 8201.81 4798.48 4967.59 -4443.39 2177.82 2.28 -0.21 3.86 5942867.51 656666.30 N 70.25068678 W 148.73414170 BP _MWD+IFR+MS
10128.66 36.02 147.73 8198.93 8279.00 4853.81 5023.49 -4490.76 2207.49 0.35 0.23 -0.44 5942820.76 656696.93 N 70.25055733 W 148.73390209 BP _MWD+IFR+MS
10224.50 36.02 148.17 8276.45 8356.52 4909.59 5079.85 -4538.53 2237.40 0.27 0.00 0.46 5942773.62 656727.81 N 70.25042680 W 148.73366059 BP _MWD+I.
10319.82 36.07 149.30 8353.52 8433.59 4964.99 5135.94 -4586.47 2266.51 0.70 0.05 1.19 5942726.29 656757.89 N 70.25029581 W 148.73342556 BP _MWD+I
10415.28 36.35 146.87 8430.55 8510.62 5020.78 5192.33 ·4634.33 2296.32 1.53 0.29 -2.55 5942679.05 656788.68 N 70.25016504 W 148.73318485 BP _MWD+IFR+MS
10510.39 34.95 145.87 8507.83 8587.90 5075.84 5247.76 -4680.49 2327.01 1.59 -1.47 -1.05 5942633.54 656820.31 N 70.25003892 W 148.73293702 BP _MWD+IFR+MS
10606.72 34.47 146.55 8587.02 8667.09 5130.34 5302.61 -4726.07 2357.52 0.64 -0.50 0.71 5942588.59 656851.74 N 70.24991435 W 148.73269069 BP _MWD+IFR+MS
10702.48 34.19 145.75 8666.10 8746.17 5184.01 5356.61 -4770.92 2387.60 0.55 -0.29 -0.84 5942544.37 656882.73 N 70.24979180 W 148.73244780 BP _MWD+IFR+MS
10729.73 34.12 143.81 8688.65 8768.72 5199.25 5371.91 -4783.42 2396.42 4.01 -0.26 -7.12 5942532.06 656891.81 N 70.24975765 W 148.73237657 BP _MWD+IFR+MS
10797.00 34.12 143.81 8744.34 8824.41 5236.89 5409.64 -4813.87 2418.70 0.00 0.00 0.00 5942502.07 656914.71 N 70.24967443 W 148.73219666 BP _MWD+IFR+MS
10807.69 35.89 145.78 8753.10 8833.17 5242.99 5415.78 -4818.89 2422.24 19.64 16.56 18.43 5942497.13 656918.34 N 70.24966074 W 148.73216813 BP _MWD+IFR+MS
10838.19 42.15 147.16 8776.78 8856.85 5262.05 5434.97 -4834.89 2432.82 20.72 20.52 4.52 5942481.35 656929.25 N 70.24961700 W 148.73208264 BP _MWD+IFR+MS
10873.40 49.87 147.33 8801.22 8881.29 5287.15 5460.28 -4856.18 2446.52 21.93 21.93 0.48 5942460.35 656943.38 N 70.24955883 W 148.73197208 BP _MWD+IFR+MS
10902.84 55.46 148.24 8819.07 8899.14 5310.32 5483.68 -4875.98 2458.99 19.15 18.99 3.09 5942440.81 656956.25 N 70.24950473 W 148.73187142 BP _MWD+IFR+MS
10934.02 62.91 147.48 8835.03 8915.10 5336.81 5510.44 -4898.64 2473.23 23.99 23.89 -2.44 5942418.45 656970.95 N 70.24944282 W 148.73175643 BP _MWD+IFR+MS
10967.11 70.53 145.76 8848.10 8928.17 5366.96 5540.81 -4923.99 2489.95 23.52 23.03 -5.20 5942393.45 656988.19 N 70.24937354 W 148.73162142 BP _MWD+IFR+MS
10998.98 76.64 142.50 8857.10 8937.17 5397.43 5571.37 -4948.74 2507.86 21.53 19.17 -10.23 5942369.07 657006.60 N 70.24930591 W 148.73147678 BP _MWD+IFR+MS
11016.66 80.04 139.89 8860.67 8940.74 5414.73 5588.68 -4962.23 2518.71 24.06 19.23 -14.76 5942355.81 657017.73 N 70.24926905 W 148.73138917 BP _MWD+IFR+MS
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) A-301A-301A-30AP B2IA-30APB2 Generated 8/5/2004 2:39 PM Page 3 of 5
".
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Latftude Longftude Survey Tool
Depth Section Departure Model
(II) (deg) (deg) (II) (II) (II) (II) (II) (II) (deg/1001l) (degf1001l) (degf100Il) (IIUS) (IIUS)
11029.44 82.67 137.69 8862.59 8942.66 5427.36 5601 .32 -4971.73 2527.03 26.70 20.58 -17.21 5942346.48 657026.24 N 70.24924308 W 148.73132196 BP _MWD+IFR+MS
11060.98 89.43 136.19 8864.77 8944.84 5458.77 5632.76 -4994.71 2548.51 21.95 21.43 -4.76 5942323.95 657048.18 N 70.24918029 W 148.73114858 BP _MWD+IFR+MS
11094.64 88.60 136.78 8865.34 8945.41 5492.37 5666.42 -5019.11 2571.68 3.03 -2.47 1.75 5942300.03 657071 .85 N 70.24911360 W 148.73096146 BP _MWD+IFR+MS
11124.52 87.78 137.47 8866.29 8946.36 5522.21 5696.28 -5041 .00 2592.00 3.59 -2.74 2.31 5942278.57 657092.61 N 70.24905379 W 148.73079737 BP _MWD+IFR+MS
11158.09 87.61 137.15 8867.64 8947.71 5555.72 5729.82 -5065.65 2614.74 1.08 -0.51 -0.95 5942254.38 657115.85 N 70.24898641 W 148.73061372 BP _MWD+IFR+MS
11189.62 87.16 137.75 8869.08 8949.15 5587.19 5761.32 -5088.86 2636.04 2.38 -1.43 1.90 5942231.62 657137.62 N 70.24892300 W 148.73044173 BP _MWD+IFR+MS
11220.94 86.82 137.82 8870.72 8950.79 5618.45 5792.60 -5112.02 2657.06 1.11 -1.09 0.22 5942208.90 657159.10 N 70.24885970 W 148.73027204 BP _MWD+IFR+MS
11253.30 86.18 138.47 8872.70 8952.77 5650.73 5824.90 -5136.08 2678.61 2.82 -1.98 2.01 5942185.29 657181.14 N 70.24879395 W 148.73009801 BP _MWD+IFR+MS
11284.87 86.15 138.83 8874.81 8954.88 5682.23 5856.40 -5159.72 2699.42 1.14 -0.10 1.14 5942162.07 657202.43 N 70.24872933 W 148.72992998 BP _MWD+IFR+MS
11315.54 88.18 139.05 8876.33 8956.40 5712.86 5887.03 -5182.82 2719.54 6.66 6.62 0.72 5942139.40 657223.02 N 70.24866621 W 148.72976752 BP _MWD+IFR+MS
11350.29 89.32 139.34 8877.08 8957.15 5747.60 5921.77 -5209.12 2742.24 3.38 3.28 0.83 5942113.57 657246.26 N 70.24859435 W 148.72958421 BP _MWD+IFR+MS
Tie-In Survey 11382.26 89.94 140.74 8877.29 8957.36 5779.56 5953.74 -5233.62 2762.77 4.79 1.94 4.38 5942089.50 657267.28 N 70.24852739 W 148.72941843 BP _MWD+.S
Inclination Trend Survey 11419.23 88.39 140.75 8877.83 8957.90 5816.52 5990.70 -5262.25 2786.16 4.19 -4.19 0.03 5942061.36 657291 .25 N 70.24844917 W 148.72922957 BP INC+T
11449.70 88.08 140.45 8878.77 8958.84 5846.98 6021.16 -5285.78 2805.49 1.42 -1.02 -0.98 5942038.23 657311.06 N 70.24838485 W 148.72907349 BP _INC+ T
11482.36 90.27 136.93 8879.24 8959.31 5879.62 6053.81 -5310.30 2827.05 12.69 6.71 -10.78 5942014.16 657333.11 N 70.24831783 W 148.72889946 BP _INC+TREND
11513.31 90.14 131.97 8879.13 8959.20 5910.43 6084.76 -5331.97 2849.13 16.03 -0.42 -16.03 5941992.95 657355.64 N 70.24825862 W 148.72872112 BP _INC+TREND
11544.24 90.27 127.21 8879.02 8959.09 5940.86 6115.69 -5351.68 2872.96 15.39 0.42 -15.39 5941973.74 657379.86 N 70.24820476 W 148.72852870 BP_INC+TREND
11578.55 90.14 124.28 8878.89 8958.96 5974.15 6150.00 -5371.72 2900.81 8.55 -0.38 -8.54 5941954.27 657408.11 N 70.24814998 W 148.72830385 BP _INC+TREND
11610.61 91.40 119.40 8878.46 8958.53 6004.64 6182.06 -5388.62 2928.03 15.72 3.93 -15.22 5941937.93 657435.67 N70.24810376 W 148.72808399 BP_INC+TREND
11639.59 91.71 114.26 8877.68 8957.75 6031.32 6211.03 -5401.69 2953.87 17.76 1.07 -17.74 5941925.39 657461.78 N 70.24806803 W 148.72787530 BP_INC+TREND
11672.36 91.65 110.28 8876.71 8956.78 6060.37 6243.78 -5414.11 2984.18 12.14 -0.18 -12.15 5941913.61 657492.33 N 70.24803409 W 148.72763053 BP _INC+ TREND
11704.32 91.37 105.45 8875.87 8955.94 6087.49 6275.73 -5423.90 3014.58 15.13 -0.88 -15.11 5941904.43 657522.92 N 70.24800729 W 148.72738501 BP _INC+ TREND
11736.03 91.44 100.70 8875.09 8955.16 6112.91 6307.43 -5431.07 3045.45 14.98 0.22 -14.98 5941897.90 657553.93 N 70.24798767 W 148.72713568 BP _INC+ TREND
11769.72 90.99 100.92 8874.38 8954.45 6139.11 6341.12 -5437.39 3078.53 1.49 -1.34 0.65 5941892.26 657587.13 N 70.24797037 W 148.72686846 BP _INC+ TREND
11801.81 90.72 100.65 8873.90 8953.97 6164.05 6373.20 -5443.39 3110.05 1.19 -0.84 -0.84 5941886.91 657618.77 N 70.24795394 W 148.72661388 BP_INC+TREND
11832.22 90.41 101.96 8873.60 8953.67 6187.87 6403.61 -5449.35 3139.87 4.43 -1.02 4.31 5941881.56 657648.70 N 70.24793762 W 148.72637304 BP _INC+ TREND
11863.85 89.28 102.23 8873.69 8953.76 6212.91 6435.24 -5455.98 3170.80 3.67 -3.57 0.85 5941875.57 657679.75 N 70.24791948 W 148.72612325 BP _INC+ TREND
11896.07 88.32 104.37 8874.36 8954.43 6238.82 6467.45 -5463.39 3202.14 7.28 -2.98 6.64 5941868.80 657711 .24 N 70.24789920 W 148.72587006 BP _INC+ TREND
11928.06 88.59 110.02 8875.22 8955.29 6265.76 6499.43 -5472.84 3232.68 17.68 0.84 17.66 5941859.98 657741.96 N 70.24787334 W 148.72562344 BP _INC+ TREND
11960.51 90.34 114.40 8875.53 8955.60 6294.53 6531.88 -5485.10 3262.71 14.53 5.39 13.50 5941848.34 657772.24 N 70.24783981 W 148.72538090 BP _INC+ TREND
11991.64 92.37 118.24 8874.79 8954.86 6323.08 6563.00 -5498.90 3290.60 13.95 6.52 12.34 5941835.12 657800.40 N 70.24780209 W 148.72515568 BP _INC+ TREND
12022.49 93.33 117.52 8873.26 8953.33 6351.67 6593.81 -5513.31 3317.84 3.89 3.11 -2.33 5941821.27 657827.92 N 70.24776269 W 148.72493573 BP_INC+TR.
12056.31 93.19 116.64 8871.33 8951 .40 6382.83 6627.57 -5528.68 3347.90 2.63 -0.41 -2.60 5941806.52 657858.29 N 70.24772067 W 148.72469296 BP _INC+ TR
12088.50 92.71 116.77 8869.68 8949.75 6412.41 6659.72 -5543.13 3376.62 1.54 -1.49 0.40 5941792.67 657887.30 N 70.24768116 W 148.72446104 BP_INC+TR
12118.01 92.06 116.95 8868.45 8948.52 6439.57 6689.21 -5556.45 3402.92 2.29 -2.20 0.61 5941779.89 657913.87 N 70.24764474 W 148.72424862 BP _INC+ TREND
12151.64 91.65 118.35 8867.36 8947.43 6470.71 6722.82 -5572.04 3432.69 4.34 -1.22 4.16 5941764.91 657943.95 N 70.24760209 W 148.72400819 BP _INC+ TREND
12185.04 91.10 120.48 8866.56 8946.63 6502.02 6756.21 -5588.44 3461.78 6.58 -1.65 6.38 5941749.11 657973.37 N 70.24755725 W 148.72377332 BP _INC+ TREND
12216.16 92.61 119.09 8865.55 8945.62 6531.25 6787.31 -5603.89 3488.77 6.59 4.85 -4.47 5941734.22 658000.67 N 70.24751501 W 148.72355535 BP _INC+ TREND
12247.46 93.91 119.17 8863.77 8943.84 6560.50 6818.56 -5619.10 3516.07 4.16 4.15 0.26 5941719.57 658028.27 N 70.24747342 W 148.72333492 BP_INC+TREND
12279.59 93.02 119.62 8861.83 8941.90 6590.57 6850.63 -5634.85 3544.01 3.10 -2.77 1.40 5941704.41 658056.52 N 70.24743038 W 148.72310929 BP_INC+TREND
12311.05 93.05 121.57 8860.16 8940.23 6620.24 6882.05 -5650.83 3571.05 6.19 0.10 6.20 5941688.98 658083.89 N 70.24738666 W 148.72289093 BP _INC+TREND
12343.27 92.26 121.37 8858.67 8938.74 6650.80 6914.23 -5667.64 3598.50 2.53 -2.45 -0.62 5941672.74 658111.67 N 70.24734073 W 148.72266926 BP _INC+ TREND
12375.05 91.92 120.77 8857.51 8937.58 6680.89 6945.99 -5684.03 3625.70 2.17 -1.07 -1.89 5941656.91 658139.20 N 70.24729591 W 148.72244960 BP _INC+ TREND
12407.10 92.88 117.04 8856.17 8936.24 6710.81 6978.01 -5699.50 3653.73 12.01 3.00 -11.64 5941642.02 658167.54 N70.24725360 W 148.72222328 BP_INC+TREND
12440.69 93.12 111.59 8854.41 8934.48 6741.09 7011.56 -5713.31 3684.29 16.22 0.71 -16.22 5941628.84 658198.37 N70.24721584 W 148.72197651 BP_INC+TREND
12470.92 92.91 113.68 8852.82 8932.89 6767.96 7041.74 -5724.93 3712.15 6.94 -0.69 6.91 5941617.80 658226.46 N 70.24718406 W 148.72175152 BP_INC+TREND
12502.47 92.06 112.45 8851 .45 8931.52 6796.12 7073.26 -5737.28 3741.15 4.74 -2.69 -3.90 5941606.05 658255.71 N 70.24715029 W 148.72151733 BP_INC+TREND
SurveyEditor Ver 3.1 RT-SP3.03-HF4.00 Bld( d031 rt-546 ) A-301A-301A-30APB2IA-30APB2 Generated 8/5/2004 2:39 PM Page 4 of 5
..
Comments Measured I Inclination I Azimuth I Sub·Sea TVD I TVD Vertical I Along Hole I NS EW I DLS I Build Rate I Walk Rate I Northing Easting Lat~ude Long~ude Survey Tool
Depth Section Departure Model
(II) (deg) (deg) (II) (II) (II) (II) (II) (II) (deg/tOOIl) (deg/1001l) (degl100ll) (IIUS) (IIUS)
12534.72 90.31 113.88 8850.79 8930.86 6824.95 7105.51 -5749.96 3770.79 7.01 -5.43 4.43 5941593.98 658285.60 N 70.24711560 W 148.72127796 BP_INC+TREND
12567.30 88.90 113.08 8851.01 8931.08 6854.17 7138.08 -5762.94 3800.67 4.98 -4.33 -2.46 5941581.61 658315.74 N 70.24708010 W 148.72103666 BP _INC+ TREND
12597.50 88.60 114.79 8851.67 8931.74 6881.35 7168.28 -5775.19 3828.27 5.75 -0.99 5.66 5941569.93 658343.58 N 70.24704660 W 148.72081381 BP _INC+TREND
12631.46 90.69 115.17 8851.88 8931.95 6912.18 7202.23 -5789.53 3859.05 6.26 6.15 1.12 5941556.23 658374.65 N 70.24700738 W 148.72056525 BP _INC+TREND
12662.87 90.14 114.84 8851.65 8931.72 6940.70 7233.64 -5802.80 3887.51 2.04 -1.75 -1.05 5941543.54 658403.37 N 70.24697107 W 148.72033539 BP _INC+TREND
12692.34 92.34 115.17 8851.01 8931.08 6967.46 7263.10 -5815.26 3914.21 7.55 7.47 1.12 5941531.64 658430.32 N 70.24693701 W 148.72011978 BP _INC+ TREND
12724.58 92.02 116.29 8849.79 8929.86 6996.89 7295.32 -5829.24 3943.24 3.61 -0.99 3.47 5941518.25 658459.62 N 70.24689876 W 148.71988542 BP _INC+ TREND
12757.82 93.32 114.04 8848.24 8928.31 7027.08 7328.53 -5843.36 3973.29 7.81 3.91 -6.77 5941504.75 658489.95 N 70.24686015 W 148.71964277 BP _INC+TREND
12789.46 94.39 110.45 8846.11 8926.18 7055.07 7360.09 -5855.31 4002.50 11.82 3.38 -11.35 5941493.41 658519.40 N 70.24682746 W 148.71940686 BP _INC+ TREND
12821.81 94.02 103.69 8843.74 8923.81 7082.21 7392.35 -5864.78 4033.32 20.87 -1.14 -20.90 5941484.58 658550.41 N 70.24680156 W 148.71915794 BP _INC+ TREND
End Inc Trend 12853.19 94.25 103.26 8841.47 8921.54 7107.45 7423.65 -5872.07 4063.76 1.55 0.73 -1.37 5941477.91 658580.99 N 70.24678159 W 148.71891212 BP _INC+ TREND
TD (Projected) 12937.00 93.94 103.26 8835.49 8915.56 7174.65 7507.25 -5891.24 4145.13 0.37 -0.37 0.00 5941460.41 658662.73 N 70.24672909 W 148.71825500 BP _BLIND
Survey Tvpe: Definitive Survey
NOTES: BOSS_GYRO - ( Sperry Sun BOSS Gyro multi-shot)
MWD + IFR + MS . ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. )
INC+ TREND - ( Inclinometer + known azi trend -- Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. )
( Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. )
e
Leqal Description:
Surface: 2098 FSL 1014 FEL S35 T11N R13E UM
Tie-In: 2098 FSL 1014 FEL 535 T11N R13E UM
BHL: 1486 FSL 2153 FEL S1 T10N R13E UM
Northinq (V) [ftUS]
5947264.98
5947264.59
5941460.41
Eastinq (X) [ftUS]
654397.99
654397.86
658662.73
e
SurveyEditor Ver 3.1 RT·SP3.03-HF4.00 Bld( d031 rt-546 )
A-301A-301A-30APB2IA-30APB2
Generated 8/5/2004 2:39 PM Page 5 of 5
~
.
,.
--
TREE =
WB..LHEAD=
A CfUCI TOR=
KB. ELEV =
BF. ELEV =
KÖP-;;'---
-MaX Ángle =
DatumMD=
Datum TVD=
4"CIW
fv'cEVOY
AXELSON
80.88'
52.92'
2200'
-96-@1-3435~
10872;
8800' SS
A-30A
113-3/8" CSG, 72#, L-80, ID = 12.347" H
~
2677'
~
I Minimum ID = 3.725" @ 8005' I
4-1/2" HES XN NIPPLE
l
-
I
I
..
19-5/8"CSG,47#, L-80, ID=8.681" H 10752' r--
ÆRFORA 1l0N SUMMA.RY
REF LOG:
ANGLE AT TOP PERF: 91 @ 12170'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DATE
2-7/8" 4 12170- 12500 C 07/03104
2-7/8" 4 12550 - 12640 C 07/03104
2-7/ff' 4 12900 - 13080 C 07/03104
17" LNR, 26#, L-80, .0383 bpf, ID = 6.276" H 11240' I
14-1/2" LNR, 12.6#, L-80, .0152bpf,ID= 3.958" H 13856'
DA TE REV BY COMrvENTS IDA TE
06/29/85 ORIGINAL COM PLETION
07102/03 DAV/KK ATTEMPTID RIG SIŒTRACK (A-30L 1)
07108/04 KAK RIG SIŒTRACK (A-30A)
07/15/04 GJBlKAK GLV C/O
REV BY
COMIvENTS
.
SAFETY NOTES: WA RNlNG: RA ~O lRANSMTlER IN
WEA THER MONITORING SHAD< rvuST BE TLRNED OFF
B8'OREANY WELL WORK IJWOLVNG EXR..OSNES CAN
BEGIN. CONTACT PADOPERATOR.···4-1/X· CHROME
TOO'"
2201' H4-1/2" HES X NIP, ID = 3.813" 1
.
ST rvÐ
4 3353
3 4217
2 6086
1 7744
~
...
DATE
07/0704
07/15/04
07/15/04
07/15/04
MILLOUT Wlt-IDOW 3451' - 3462'
7939' H4-1/2" HES X NIP, ID = 3.813" 1
z~ 7960' H7" X 4-1/2" BKRS-3PKR I
- --t 7984' H4-1/2" HES X NIP, ID = 3.813" I
--t 8005' H4-1/2" HESXN NP, ID= 3.725"
~ïi 8016' H4-1/2"TBG,12.6#,13-CR.
I .0152 bpf, ID =3.958"
8017' H4-112" WLEG, D = 3.958"1
8011' 117" X 5" BKR ZXP LNR TOP I
'" A<RWlTlffiAD< SLV
\ I 8035' H5" X 4-1/2" XO, ID = 3.950" 1
1 10797' H7" LNR, 26#, L-80, I
1.0383 bpf, ID = 6.276"
T
12154' H4-1/2"HESEZSvl
:8>----/ 330T H9-5/8" X T' BKRZXPLNR TOPPKR 1
GAS LIFT MA t-IDRELS
1V D DBI TYPE VL V LA TCI- PORT
3263 32 KBG-2 DrvtY BK 0
3912 43 KBG-2 DOME BK 16
5255 45 KBG-2 DOME BK 16
6460 43 KBG-2 SO BK 22
~
I 13768' H PBm I
FRLDHOE SA Y UNIT
WB..L: A-30A
PERMIT No: 2040780
API No: 50-029-21372-01
SEL 35, T11 N, R13E. 2099' NSL & 1014' WEL
BP Exploration (Alaska)
SCHLUMBERGER
Survey report
Client...................: BP Exploration (Alaska) Inc.
Field. .... ........ .......: Prudhoe Bay Unit
Well. . . . . . . . . . . . . . . . . . . . .: A-30A
API number.......... .....: 50-029-21372-01
Engineer.................: M. Dammeyer
Rig:........ ... ...... ....: Nabors 7ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS..... ......: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..... .....: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 51.37 ft
KB above permanent.... ...: 0.00 ft
DF above permanent.......: 80.07 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-) ..... ...: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-) ........: -999.25 ft
Azimuth from rotary table to target: 139.75 degrees
RECEIVED
p\UG 2;: 2004
Alaska Oil & Gas Cons. Commø:m
Anchorage
27-Jun-2004 06:19:30
Spud date...... . . . . . . . . . . :
Last survey date.... .....:
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
~{)cf -'0 7 g
Page
1 of 7
29-May-04
27-Jun-04
178
3399.19 ft
13859.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model. .... ......: BGGM version 2003
Magnetic date.... ........: 30-May-2004
Magnetic field strength..: 1151.76 HCNT
Magnetic dec (+E/W-).....: 25.20 degrees
Magnetic dip.......... ...: 80.83 degrees
----- MWD survey Reference
Reference G........... ...:
Reference H....... .......:
Reference Dip... .........:
Tolerance of G... ........:
Tolerance of H... ........:
Tolerance of Dip. ........:
Criteria ---------
1002.68 mGal
1151. 76 HCNT
80.83 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
.
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 25.20 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 25.20 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
T=Trend Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
. SCHDUMBERGER Survey Report 27-Jun-2004 06:19:30 Page 2 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 3399.19 33.07 144.81 0.00 3302.30 487.30 -436.64 238.41 497.49 151.37 0.00 TIP None
2 3446.00 34.28 144.91 46.81 3341.25 513 .15 -457.86 253.35 523.28 151.04 2.59 MWD M IFR+G+I
3 3462.00 35.77 147.02 16.00 3354.36 522.28 -465.48 258.48 532.43 150.96 12.00 MWD M IFR+G+I
4 3474.00 35.77 147.02 12.00 3364.09 529.24 -471.36 262.30 539.43 150.90 0.00 MWD M IFR+G+I
5 3527.08 38.45 149.64 53.08 3406.42 560.89 -498.62 279.09 571.41 150.76 5.86 MWD M IFR+G+I
6 3621.83 43.30 159.69 94.75 3478.12 620.56 -554.60 305.30 633.09 151.17 8.61 MWD M IFR+G+I
7 3718.63 43.67 163.56 96.80 3548.37 682.35 -617.80 326.29 698.67 152.16 2.78 MWD M IFR+G+I .
8 3813.92 43.65 155.57 95.29 3617.36 744.14 -679.34 349.22 763.85 152.79 5.79 MWD M IFR+G+I
9 3910.27 43.54 153.24 96.35 3687.14 808.40 -739.26 377.92 830.25 152.92 1. 67 MWD M IFR+G+I
10 4005.51 42.92 156.24 95.24 3756.54 871.40 -798.23 405.75 895.44 153.06 2.25 MWD M IFR+G+I
11 4100.45 42.26 156.44 94.94 3826.44 932.98 -857.08 431.54 959.59 153.27 0.71 MWD M IFR+G+I
12 4196.49 43.37 157.38 96.04 3896.89 995.34 -917.12 457.13 1024.74 153.51 1. 33 MWD M IFR+G+I
13 4293.03 43.10 156.98 96.54 3967.22 1058.43 -978.08 482.78 1090.74 153.73 0.40 MWD M IFR+G+I
14 4387.20 44.06 155.31 94.17 4035.44 1120.71 -1037.44 509.04 1155.60 153.86 1.59 MWD M IFR+G+I
15 4483.97 43.23 156.12 96.77 4105.47 1184.92 -1098.32 536.51 1222.35 153.97 1. 03 MWD M IFR+G+I
16 4579.76 43.99 156.79 95.79 4174.83 1248.20 -1158.89 562.90 1288.36 154.09 0.93 MWD M IFR+G+I
17 4675.82 43.98 155.63 96.06 4243.94 1312.18 -1219.93 589.81 1355.03 154.20 0.84 MWD M IFR+G+I
18 4770.96 43.07 154.85 95.14 4312.93 1375.31 -1279.42 617.24 1420.53 154.25 1.11 MWD M IFR+G+I
19 4866.63 44.11 158.69 95.67 4382.23 1438.36 -1340.02 643.23 1486.41 154.36 2.97 MWD M IFR+G+I
20 4962.36 43.31 158.86 95.73 4451. 43 1500.89 -1401. 69 667.18 1552.37 154.55 0.84 MWD M IFR+G+I
21 5057.71 44.25 159.71 95.35 4520.27 1563.07 -1463.39 690.51 1618.12 154.74 1.16 MWD M IFR+G+I
22 5153.11 43.97 159.36 95.40 4588.77 1625.55 -1525.60 713.73 1684.30 154.93 0.39 MWD M IFR+G+I .
23 5249.30 44.35 158.18 96 .19 4657.78 1688.90 -1588.07 738.00 1751.17 155.08 0.94 MWD M IFR+G+I
24 5344.71 43.57 155.57 95.41 4726.46 1752.18 -1648.97 763.99 1817.35 155.14 2.07 MWD M IFR+G+I
25 5439.95 44.88 158.55 95.24 4794.72 1815.58 -1710.13 789.86 1883.73 155.21 2.58 MWD M IFR+G+I
26 5535.36 44.55 156.22 95.41 4862.52 1879.54 -1772.09 815.66 1950.80 155.28 1. 75 MWD M IFR+G+I
27 5631.47 43.62 156.08 96 .11 4931.56 1943.68 -1833.25 842.70 2017.66 155.31 0.97 MWD M IFR+G+I
28 5726.11 43.66 157.91 94.64 5000.05 2006.06 -1893.36 868.22 2082.94 155.37 1. 34 MWD M IFR+G+I
29 5822.15 44.66 160.52 96.04 5068.95 2069.12 -1955.91 891.95 2149.69 155.49 2.16 MWD M IFR+G+I
30 5917.24 45.12 159.59 95.09 5136.32 2132.06 -2018.99 914 . 84 2216.59 155.62 0.84 MWD M IFR+G+I
SCHLUMBERGER Survey Report 27-Jun-2004 06:19:30 Page 3 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 6013.41 45.16 155.70 96.17 5204.17 2196.91 -2082.01 940.76 2284.69 155.68 2.87 MWD M IFR+G+I
32 6109.21 44.98 157.32 95.80 5271.83 2261.85 -2144.21 967.79 2352.50 155.71 1.21 MWD M IFR+G+I
33 6205.94 44.84 156.49 96.73 5340.34 2327.10 -2207.03 994.58 2420.78 155.74 0.62 MWD M IFR+G+I
34 6301.09 45.05 153.08 95.15 5407.69 2391.99 -2267.82 1023.21 2487.96 155.72 2.54 MWD M IFR+G+I
35 6396.14 45.54 154.97 95.05 5474.56 2457.46 -2328.55 1052.79 2555.48 155.67 1. 50 MWD M IFR+G+I
36 6491. 71 44.68 151. 80 95.57 5542.02 2523.24 -2389.07 1083.10 2623.12 155.61 2.52 MWD M IFR+G+I
37 6586.77 44.05 149.76 95.06 5609.98 2588.47 -2447.08 1115.54 2689.35 155.49 1. 64 MWD M IFR+G+I .
38 6683.47 43.68 150.27 96.70 5679.70 2654.40 -2505.12 1149.03 2756.06 155.36 0.53 MWD M IFR+G+I
39 6779.05 43.12 151. 48 95.58 5749.14 2718.84 -2562.48 1181.00 2821.54 155.26 1. 05 MWD M IFR+G+I
40 6875.65 42.35 149.72 96.60 5820.10 2783.21 -2619.59 1213.17 2886.87 155.15 1. 47 MWD M IFR+G+I
41 6971.04 42.91 147.76 95.39 5890.28 2847.02 -2674.81 1246.69 2951.07 155.01 1. 51 MWD M IFR+G+I
42 7065.64 42.59 149.88 94.60 5959.75 2910.42 -2729.74 1279.94 3014.91 154.88 1. 56 MWD M IFR+G+I
43 7162.37 42.28 147.82 96.73 6031.15 2974.86 -2785.59 1313.69 3079.82 154.75 1.47 MWD M IFR+G+I
44 7257.24 42.74 147.79 94.87 6101.08 3038.34 -2839.84 1347.85 3143.47 154.61 0.49 MWD M IFR+G+I
45 7353.47 42.30 149.20 96.23 6172.01 3102.61 -2895.28 1381. 84 3208.14 154.49 1. 09 MWD M IFR+G+I
46 7449.46 42.30 151.50 95.99 6243.01 3166.10 -2951.42 1413.79 3272.57 154.40 1. 61 MWD M IFR+G+I
47 7544.75 42.34 151.07 95.29 6313.47 3228.96 -3007.69 1444.62 3336.63 154.34 0.31 MWD M IFR+G+I
48 7640.53 42.78 151. 72 95.78 6384.02 3292.41 -3064.56 1475.63 3401.33 154.29 0.65 MWD M IFR+G+I
49 7735.81 43.13 151. 19 95.28 6453.75 3355.99 -3121.59 1506.66 3466.17 154.24 0.53 MWD M IFR+G+I
50 7831. 03 42.80 153.47 95.22 6523.43 3419.32 -3179.06 1536.79 3531.03 154.20 1. 67 MWD M IFR+G+I
51 7926.86 42.08 152.54 95.83 6594.16 3482.26 -3236.68 1566.14 3595.68 154.18 1. 00 MWD M IFR+G+I
52 8022.34 42.56 151.99 95.48 6664.75 3545.02 -3293.58 1596.06 3659.93 154.15 0.63 MWD M IFR+G+I .
53 8118.06 41. 81 152.62 95.72 6735.68 3607.76 -3350.49 1625.93 3724.17 154.11 0.90 MWD M IFR+G+I
54 8214.33 41.77 151. 69 96 .27 6807.46 3670.41 -3407.22 1655.90 3788.29 154.08 0.65 MWD M IFR+G+I
55 8310.06 43.22 151.70 95.73 6878.04 3733.68 -3464.15 1686.56 3852.90 154.04 1. 51 MWD M IFR+G+I
56 8406.16 43.89 152.22 96 .10 6947.69 3798.40 -3522.60 1717.69 3919.07 154.01 0.79 MWD M IFR+G+I
57 8501. 93 42.95 158.43 95.77 7017.28 3861.75 -3582.34 1745.17 3984.82 154.03 4.56 MWD M IFR+G+I
58 8597.09 44.08 158.13 95.16 7086.29 3923.88 -3643.21 1769.42 4050.16 154.10 1.21 MWD M IFR+G+I
59 8693.56 45.79 159.35 96 .47 7154.58 3988.30 -3706.70 1794.11 4118.07 154.17 1. 98 MWD M IFR+G+I
60 8788.59 44.13 158.22 95.03 7221.82 4051.77 -3769.30 1818.40 4185.00 154.25 1. 94 MWD M IFR+G+I
SCHLUMBERGER Survey Report 27-Jun-2004 06:19:30 Page 4 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
61 8884.29 42.04 159.16 95.70 7291.71 4113.60 -3830.20 1842.17 4250.17 154.31 2.28 MWD M IFR+G+I
62 8979.37 41. 14 157.24 95.08 7362.82 4173.46 -3888.79 1865.59 4313.14 154.37 1. 64 MWD M IFR+G+I
63 9075.49 39.43 158.22 96 .12 7436.15 4232.57 -3946.30 1889.15 4375.18 154.42 1. 90 MWD M IFR+G+I
64 9171.06 37.72 154.61 95.57 7510.87 4289.63 -4000.91 1912.95 4434.71 154.45 2.96 MWD M IFR+G+I
65 9266.35 36.77 151.97 95.29 7586.73 4345.68 -4052.42 1938.86 4492.36 154.43 1. 95 MWD M IFR+G+I
66 9362.56 36.16 151. 55 96 .21 7664.10 4401.61 -4102.79 1965.91 4549.48 154.40 0.69 MWD M IFR+G+I .
67 9460.01 37.01 148.90 97.45 7742.36 4458.71 -4153.19 1994.76 4607.39 154.35 1. 84 MWD M IFR+G+I
68 9555.84 36.88 149.55 95.83 7818.95 4515.52 -4202.68 2024.23 4664.76 154.28 0.43 MWD M IFR+G+I
69 9649.45 36.84 147.77 93.61 7893.85 4570.99 -4250.63 2053.44 4720.64 154.22 1.14 MWD M IFR+G+I
70 9742.08 37.03 147.75 92.63 7967.89 4626.11 -4297.71 2083.13 4775.96 154.14 0.21 MWD M IFR+G+I
71 9841.56 37.29 148.13 99.48 8047.17 4685.59 -4348.64 2115.02 4835.70 154.06 0.35 MWD M IFR+G+I
72 9937.09 36.00 144.43 95.53 8123.82 4742.21 -4396.06 2146.64 4892.18 153.97 2.68 MWD M IFR+G+I
73 10033.35 35.80 148.15 96.26 8201.81 4798.27 -4442.99 2177.96 4948.10 153.89 2.28 MWD M IFR+G+I
74 10128.66 36.02 147.73 95.31 8279.00 4853.60 -4490.37 2207.63 5003.70 153.82 0.35 MWD M IFR+G+I
75 10224.50 36.02 148.17 95.84 8356.52 4909.38 -4538.14 2237.54 5059.77 153.75 0.27 MWD M IFR+G+I
76 10319.82 36.07 149.30 95.32 8433.59 4964.78 -4586.08 2266.65 5115.64 153.70 0.70 MWD M IFR+G+I
77 10415.28 36.35 146.87 95.46 8510.62 5020.57 -4633.94 2296.46 5171. 76 153.64 1. 53 MWD M IFR+G+I
78 10510.39 34.95 145.87 95.11 8587.90 5075.63 -4680.09 2327.15 5226.75 153.56 1. 59 MWD M IFR+G+I
79 10606.72 34.47 146.55 96.33 8667.09 5130.13 -4725.68 2357.66 5281.15 153.49 0.64 MWD M IFR+G+I
80 10702.48 34.19 145.75 95.76 8746.17 5183.80 -4770.53 2387.74 5334.72 153.41 0.55 MWD M IFR+G+I
81 10729.73 34.12 143.81 27.25 8768.72 5199.03 -4783.03 2396.56 5349.84 153.39 4.01 MWD M IFR+G+I .
82 10797.00 34.12 143.81 67.27 8824.41 5236.67 -4813.48 2418.84 5387.06 153.32 0.00 MWD M None
83 10807.69 35.89 145.78 10.69 8833.17 5242.78 -4818.49 2422.37 5393.12 153.31 19.64 MWD M IFR+G+I
84 10838.19 42.15 147.16 30.50 8856.85 5261.84 -4834.50 2432.96 5412.18 153.29 20.72 MWD M IFR+G+I
85 10873.40 49.87 147.33 35.21 8881.29 5286.94 -4855.79 2446.65 5437.35 153.26 21. 93 MWD M IFR+G+I
86 10902.84 55.46 148.24 29.44 8899.14 5310.10 -4875.59 2459.12 5460.64 153.23 19.15 MWD M IFR+G+I
87 10934.02 62.91 147.48 31.18 8915.10 5336.59 -4898.24 2473.36 5487.28 153.21 23.99 MWD M IFR+G+I
88 10967.11 70.53 145.76 33.09 8928.17 5366.75 -4923.60 2490.08 5517.46 153.17 23.52 MWD M IFR+G+I
89 10998.98 76.64 142.50 31.87 8937.17 5397.21 -4948.35 2508.00 5547.63 153.12 21. 53 MWD M IFR+G+I
90 11016.66 80.04 139.89 17.68 8940.74 5414.52 -4961.83 2518.85 5564.56 153.09 24.06 MWD M IFR+G+I
SCHLUMBERGER Survey Report 27-Jun-2004 06:19:30 Page 5 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
91 11029.44 82.67 137.69 12.78 8942.67 5427.15 -4971. 34 2527.17 5576.81 153.05 26.70 MWD M IFR+G+I
92 11060.98 89.43 136.19 31.54 8944.84 5458.56 -4994.31 2548.64 5607.02 152.96 21. 95 MWD M IFR+G+I
93 11094.64 88.60 136.78 33.66 8945.42 5492.16 -5018.72 2571.81 5639.30 152.87 3.03 MWD M IFR+G+I
94 11124.52 87.78 137.47 29.88 8946.36 5521.99 -5040.60 2592.13 5668.05 152.79 3.59 MWD M IFR+G+I
95 11158.09 87.61 137.15 33.57 8947.71 5555.50 -5065.26 2614.88 5700.39 152.70 1. 08 MWD M IFR+G+I
96 11189.62 87.16 137.75 31.53 8949.15 5586.98 -5088.46 2636.18 5730.78 152.61 2.38 MWD M IFR+G+I .
97 11220.94 86.82 13 7.82 31.32 8950.79 5618.23 -5111.63 2657.19 5761.02 152.53 1.11 MWD M IFR+G+I
98 11253.30 86.18 138.47 32.36 8952.77 5650.52 -5135.68 2678.74 5792.31 152.45 2.82 MWD M IFR+G+I
99 11284.87 86.15 13 8.83 31.57 8954.88 5682.01 -5159.33 2699.55 5822.91 152.38 1.14 MWD M IFR+G+I
100 11315.54 88.18 139.05 30.67 8956.40 5712.64 -5182.43 2719.67 5852.71 152.31 6.66 MWD M IFR+G+I
101 11350.29 89.32 139.34 34.75 8957.15 5747.38 -5208.72 2742.38 5886.55 152.23 3.39 MWD M IFR+G+I
102 11382.26 89.94 140.74 31. 97 8957.36 5779.35 -5233.23 2762.91 5917.80 152.17 4.79 MWD M IFR+G+I
Sidetrack; New MWD, Az Failed
103 11419.23 88.39 140.75 36.97 8957.90 5816.31 -5261.85 2786.30 5954.03 152.10 4.19 MWD M T
104 11449.70 88.08 140.45 30.47 8958.84 5846.76 -5285.38 2805.63 5983.88 152.04 1.42 MWD M T
105 11482.36 90.27 136.93 32.66 8959.31 5879.40 -5309.91 2827.18 6015.65 151.97 12.69 MWD M T
106 11513.31 90.14 131. 97 30.95 8959.20 5910.21 -5331.57 2849.27 6045.17 151. 88 16.03 MWD M T
107 11544.24 90.27 127.21 30.93 8959.09 5940.65 -5351.28 2873.10 6073.79 151. 77 15.39 MWD M T
108 11578.55 90.14 124.28 34.31 8958.96 5973.93 -5371.32 2900.94 6104.63 151. 63 8.55 MWD M T
109 11610.61 91. 40 119.40 32.06 8958.53 6004.43 -5388.23 2928.17 6132.47 151. 48 15.72 MWD M T .
110 11639.59 91.71 114.26 28.98 8957.75 6031.10 -5401.30 2954.01 6156.31 151. 33 17.76 MWD M T
111 11672.36 91.65 110.28 32.77 8956.79 6060.16 -5413.71 2984.31 6181.78 151. 13 12.14 MWD M T
112 11704.32 91. 37 105.45 31. 96 8955.94 6087.28 -5423.51 3014.71 6205.07 150.93 15.13 MWD M T
113 11736.03 91. 44 100.70 31.71 8955.17 6112.69 -5430.68 3045.58 6226.38 150.72 14.98 MWD M T
114 11769.72 90.99 100.92 33.69 8954.45 6138.89 -5436.99 3078.67 6248.13 150.48 1.49 MWD M T
115 11801.81 90.72 100.65 32.09 8953.97 6163.84 -5443.00 3110.19 6268.93 150.26 1.19 MWD M T
116 11832.22 90.41 101.96 30.41 8953.67 6187.65 -5448.96 3140.01 6288.94 150.05 4.43 MWD M T
117 11863.85 89.28 102.23 31. 63 8953.76 6212.70 -5455.59 3170.93 6310.17 149.83 3.67 MWD M T
118 11896.07 88.32 104.37 32.22 8954.43 6238.61 -5463.00 3202.28 6332.37 149.62 7.28 MWD M T
119 11928.06 88.59 110.02 31.99 8955.30 6265.55 -5472.45 3232.82 6356.00 149.43 17.68 MWD M T
120 11960.51 90.34 114.40 32.45 8955.60 6294.31 -5484.71 3262.85 6381.87 149.25 14.53 MWD M T
SCHLUMBERGER Survey Report 27-Jun-2004 06:19:30 Page 6 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
121 11991.64 92.37 118.24 31.13 8954.86 6322.86 -5498.50 3290.74 6408.00 149.10 13.95 MWD M T
122 12022.49 93.33 117.52 30.85 8953.33 6351.45 -5512.91 3317.97 6434.37 148.96 3.89 MWD M T
123 12056.31 93.19 116.64 33.82 8951.41 6382.61 -5528.28 3348.03 6463.07 148.80 2.63 MWD M T
124 12088.50 92.71 116.77 32.19 8949.75 6412.19 -5542.73 3376.75 6490.32 148.65 1.54 MWD M T
125 12118.01 92.06 116.95 29.51 8948.52 6439.35 -5556.05 3403.06 6515.40 148.51 2.29 MWD M T
126 12151.64 91.65 118.35 33.63 8947.43 6470.50 -5571.65 3432.83 6544.28 148.36 4.34 MWD M T .
127 12185.04 91.10 120.48 33.40 8946.63 6501.80 -5588.05 3461.91 6573.52 148.22 6.58 MWD M T
128 12216.16 92.61 119.09 31.12 8945.62 6531.04 -5603.50 3488.91 6600.88 148.09 6.59 MWD M T
129 12247.46 93.91 119.17 31.30 8943.84 6560.28 -5618.71 3516.20 6628.24 147.96 4.16 MWD M T
130 12279.59 93.02 119.62 32.13 8941.90 6590.35 -5634.45 3544.15 6656.43 147.83 3.10 MWD M T
131 12311.05 93.05 121. 57 31. 46 8940.24 6620.03 -5650.44 3571.19 6684.37 147.71 6.19 MWD M T
132 12343.27 92.26 121. 37 32.22 8938.74 6650.59 -5667.24 3598.64 6713.26 147.58 2.53 MWD M T
133 12375.05 91. 92 120.77 31.78 8937.58 6680.67 -5683.63 3625.84 6741. 69 147.46 2.17 MWD M T
134 12407.10 92.88 117.04 32.05 8936.24 6710.59 -5699.11 3653.87 6769.83 147.33 12.01 MWD M T
135 12440.69 93.12 111.59 33.59 8934.48 6740.88 -5712.91 3684.42 6797.97 147.18 16.22 MWD M T
136 12470.92 92.91 113.68 30.23 8932.89 6767.74 -5724.53 3712.29 6822.85 147.04 6.94 MWD M T
137 12502.47 92.06 112.45 31.55 8931.52 6795.91 -5736.88 3741.28 6849.01 146.89 4.74 MWD M T
138 12534.72 90.31 113.88 32.25 8930.86 6824.74 -5749.56 3770.93 6875.85 146.74 7.01 MWD M T
139 12567.30 88.90 113.08 32.58 8931.08 6853.95 -5762.54 3800.81 6903.12 146.59 4.98 MWD M T
140 12597.99 88.39 113.83 30.69 8931.81 6881.46 -5774.75 3828.95 6928.83 146.45 2.95 MWD M T
141 12631. 07 85.85 116.09 33.08 8933.47 6911.45 -5788.69 3858.90 6957.02 146.31 10.27 MWD M T .
142 12693.81 86.57 117.35 62.74 8937.62 6969.06 -5816.84 3914.82 7011.52 146.06 2.31 MWD M T
143 12726.83 88.70 116.76 33.02 8938.98 6999.50 -5831.85 3944.20 7040.39 145.93 6.69 MWD M T
144 12758.38 89.55 117.65 31. 55 8939.46 7028.63 -5846.27 3972.25 7068.07 145.81 3.90 MWD M T
145 12789.77 91.34 114.35 31.39 8939.22 7057.36 -5860.03 4000.46 7095.32 145.68 11.96 MWD M T
146 12821.39 91. 44 114.79 31.62 8938.45 7085.96 -5873.17 4029.21 7122.40 145.55 1.43 MWD M T
147 12853.44 90.51 114.66 32.05 8937.90 7115.00 -5886.57 4058.32 7149.94 145.42 2.93 MWD M T
148 12884.16 90.07 114.34 30.72 8937.75 7142.78 -5899.31 4086.27 7176.32 145.29 1. 77 MWD M T
149 12917.83 89.79 111.86 33.67 8937.79 7172.88 -5912.52 4117.24 7204.83 145.15 7.41 MWD M T
150 12949.95 89.52 111.51 32.12 8937.98 7201. 22 -5924.39 4147.08 7231. 65 145.01 1. 38 MWD M T
. , .
SCHLUMBERGER Survey Report 27-Jun-2004 06:19:30 Page 7 of 7
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/s- +E/w- displ Azim (deg I tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
151 12979.92 88.97 114.09 29.97 8938.38 7227.93 -5936.00 4174.71 7257.02 144.88 8.80 MWD M T
152 13013.06 88.36 116.28 33.14 8939.15 7258.06 -5950.10 4204.69 7285.81 144.75 6.86 MWD M T
153 13044.22 88.56 117.37 31.16 8939.99 7286.75 -5964.16 4232.48 7313.35 144.64 3.56 MWD M T
154 13075.50 88.46 115.11 31. 28 8940.80 7315.42 -5977.98 4260.53 7340.87 144.52 7.23 MWD M T
155 13107.59 88.22 110.58 32.09 8941.73 7344.02 -5990.43 4290.08 7368.18 144.39 14.13 MWD M T
156 13139.77 88.25 108.03 32.18 8942.72 7371.74 -6001.06 4320.44 7394.52 144.25 7.92 MWD M T .
157 13170.98 88.05 109.18 31.21 8943.73 7398.44 -6011.02 4350.00 7419.89 144. 11 3.74 MWD M T
158 13203.47 88.29 107.93 32.49 8944.77 7426.22 -6021.35 4380.78 7446.33 143.96 3.92 MWD M T
159 13235.46 87.98 111.43 31.99 8945.81 7453.88 -6032.11 4410.88 7472.77 143.82 10.98 MWD M T
160 13266.32 87.98 111. 08 30.86 8946.90 7480.99 -6043.29 4439.63 7498.78 143.70 1.13 MWD M T
161 13298.98 87.47 113.11 32.66 8948.19 7509.89 -6055.57 4469.86 7526.59 143.57 6.40 MWD M T
162 13330.96 86.92 113 .09 31.98 8949.76 7538.44 -6068.10 4499.24 7554.14 143.44 1. 72 MWD M T
163 13361.37 86.81 113.68 30.41 8951. 42 7565.65 -6080.15 4527.11 7580.44 143.33 1. 97 MWD M T
164 13393.83 88.70 110.88 32.46 8952.69 7594.42 -6092.45 4557.12 7608.24 143.20 10.40 MWD M T
165 13426.42 88.73 112.31 32.59 8953.42 7623.15 -6104.44 4587.42 7636.00 143.08 4.39 MWD M T
166 13456.97 90.65 109.36 30.55 8953.59 7649.88 -6115.30 4615.96 7661.86 142.95 11.52 MWD M T
167 13490.18 91. 68 109.54 33.21 8952.91 7678.55 -6126.36 4647.27 7689.56 142.82 3.15 MWD M T
168 13521.70 92.61 109.94 31.52 8951.73 7705.82 -6137.00 4676.92 7715.98 142.69 3.21 MWD M T
169 13551.77 90.21 107.62 30.07 8950.99 7731.60 -6146.67 4705.38 7740.94 142.57 11.10 MWD M T
170 13586.58 92.43 107.60 34.81 8950.19 7761.06 -6157.20 4738.54 7769.49 142.42 6.38 MWD M T
171 13617.84 93.29 108.55 31. 26 8948.63 7787.63 -6166.89 4768.22 7795.28 142.29 4.10 MWD M T .
172 13648.84 95.39 107.29 31.00 8946.29 7813.89 -6176.40 4797.63 7820.82 142.16 7.89 MWD M T
173 13681.63 95.22 108.62 32.79 8943.25 7841. 64 -6186.46 4828.69 7847.84 142.03 4.07 MWD M T
174 13713.59 95.35 108.70 31. 96 8940.31 7868.90 -6196.65 4858.84 7874.44 141.90 0.48 MWD M T
175 13746.03 95.29 110.12 32.44 8937.30 7896.77 -6207.38 4889.31 7901.70 141.77 4.36 MWD M T
176 13777.23 94.77 108.43 31.20 8934.57 7923.56 -6217.64 4918.64 7927.93 141.65 5.65 MWD M T
177 13805.69 95.15 109.36 28.46 8932.11 7947.90 -6226.82 4945.47 7951.79 141.54 3.52 MWD M T
178 13859.00 95.15 109.36 53.31 8927.32 7993.70 -6244.42 4995.56 7996.77 141.34 0.00 MWD M Projected
SCHLUMBERGER
Survey report
Client... .......... ......: BP Exploration (Alaska) Inc.
Field............... .....: Prudhoe Bay Unit
Well.. ........ .... .......: A-30A PB1
API number... .... ........: 50-029-21372-70
Engineer.... ..... ........: M. Dammeyer
Rig: ......... ............: Nabors 7ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.. ...: Minimum curvature
Method for DLS.. .........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum. ... ......: Mean Sea Level
Depth reference...... ....: Driller's Pipe Tally
GL above permanent.......: 51.37 ft
KB above permanent... ....: 0.00 ft
DF above permanent.. .....: 80.07 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-) ........: -999.25 ft
Azimuth from rotary table to target: 139.75 degrees
[(c)2004 IDEAL ID8 1C_01]
RECEIVED
AUG :; .¡ 2004
Alaska Oil & Gas Co
~Commission
27-Jun-2004 08:13:35
Spud date..... ...........:
Last survey date..... ....:
Total accepted surveys...:
MD of first survey.......:
MD of last survey.... ....:
dD c/- 07 $(
Page
1 of 6
29-May-04
27-Jun-04
122
3399.19 ft
12139.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model....... ....: BGGM version 2003
Magnetic date........ ....: 30-May-2004
Magnetic field strength..: 1151.76 HCNT
Magnetic dec (+E/W-). ....: 25.20 degrees
Magnetic dip......... ....: 80.83 degrees
----- MWD survey Reference
Reference G..............:
Reference H..............:
Reference Dip............:
Tolerance of G...........:
Tolerance of H...........:
Tolerance of Dip.........:
Criteria ---------
1002.68 mGal
1151.76 HCNT
80.83 degrees
(+/-) 2.50 mGal
( + / -) 6. 00 HCNT
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-). ....: 25.20 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 25.20 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
T=Trend Correction
R=Magnetic Resonance Tool Correction
G=Gmag Magnetic Correction
.
SCHLUMBERGER Survey Report 27-Jun-2004 09:06:34 Page 2 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 3399.19 33.07 144.81 0.00 3302.30 487.30 -436.64 238.41 497.49 151.37 0.00 TIP None
2 3446.00 34.28 144.91 46.81 3341.25 513 . 15 -457.86 253.35 523.28 151.04 2.59 MWD M IFR+G+I
3 3462.00 35.77 147.02 16.00 3354.36 522.28 -465.48 258.48 532.43 150.96 12.00 MWD M IFR+G+I
4 3474.00 35.77 147.02 12.00 3364.09 529.24 -471.36 262.30 539.43 150.90 0.00 MWD M IFR+G+I
5 3527.08 38.45 149.64 53.08 3406.42 560.89 -498.62 279.09 571.41 150.76 5.86 MWD M IFR+G+I
6 3621.83 43.30 159.69 94.75 3478 .12 620.56 -554.60 305.30 633.09 151. 17 8.61 MWD M IFR+G+I .
7 3718.63 43.67 163.56 96.80 3548.37 682.35 -617.80 326.29 698.67 152.16 2.78 MWD M IFR+G+I
8 3813.92 43.65 155.57 95.29 3617.36 744.14 -679.34 349.22 763.85 152.79 5.79 MWD M IFR+G+I
9 3910.27 43.54 153.24 96.35 3687.14 808.40 -739.26 377.92 830.25 152.92 1. 67 MWD M IFR+G+I
10 4005.51 42.92 156.24 95.24 3756.54 871.40 -798.23 405.75 895.44 153.06 2.25 MWD M IFR+G+I
11 4100.45 42.26 156.44 94.94 3826.44 932.98 -857.08 431.54 959.59 153.27 0.71 MWD M IFR+G+I
12 4196.49 43.37 157.38 96.04 3896.89 995.34 -917.12 457.13 1024.74 153.51 1. 33 MWD M IFR+G+I
13 4293.03 43.10 156.98 96.54 3967.22 1058.43 -978.08 482.78 1090.74 153.73 0.40 MWD M IFR+G+I
14 4387.20 44.06 155.31 94.17 4035.44 1120.71 -1037.44 509.04 1155.60 153.86 1. 59 MWD M IFR+G+I
15 4483.97 43.23 156.12 96.77 4105.47 1184.92 -1098.32 536.51 1222.35 153.97 1. 03 MWD M IFR+G+I
16 4579.76 43.99 156.79 95.79 4174.83 1248.20 -1158.89 562.90 1288.36 154.09 0.93 MWD M IFR+G+I
17 4675.82 43.98 155.63 96.06 4243.94 1312.18 -1219.93 589.81 1355.03 154.20 0.84 MWD M IFR+G+I
18 4770.96 43.07 154.85 95.14 4312.93 1375.31 -1279.42 617.24 1420.53 154.25 1.11 MWD M IFR+G+I
19 4866.63 44.11 158.69 95.67 4382.23 1438.36 -1340.02 643.23 1486.41 154.36 2.97 MWD M IFR+G+I
20 4962.36 43.31 158.86 95.73 4451.43 1500.89 -1401.69 667.18 1552.37 154.55 0.84 MWD M IFR+G+I
21 5057.71 44.25 159.71 95.35 4520.27 1563.07 -1463.39 690.51 1618.12 154.74 1.16 MWD M IFR+G+I .
22 5153.11 43.97 159.36 95.40 4588.77 1625.55 -1525.60 713.73 1684.30 154.93 0.39 MWD M IFR+G+I
23 5249.30 44.35 158.18 96.19 4657.78 1688.90 -1588.07 738.00 1751.17 155.08 0.94 MWD M IFR+G+I
24 5344.71 43.57 155.57 95.41 4726.46 1752.18 -1648.97 763.99 1817.35 155.14 2.07 MWD M IFR+G+I
25 5439.95 44.88 158.55 95.24 4794.72 1815.58 -1710.13 789.86 1883.73 155.21 2.58 MWD M IFR+G+I
26 5535.36 44.55 156.22 95.41 4862.52 1879.54 -1772.09 815.66 1950.80 155.28 1. 75 MWD M IFR+G+I
27 5631.47 43.62 156.08 96.11 4931.56 1943.68 -1833.25 842.70 2017.66 155.31 0.97 MWD M IFR+G+I
28 5726.11 43.66 157.91 94.64 5000.05 2006.06 -1893.36 868.22 2082.94 155.37 1. 34 MWD M IFR+G+I
29 5822.15 44.66 160.52 96.04 5068.95 2069.12 -1955.91 891.95 2149.69 155.49 2.16 MWD M IFR+G+I
30 5917.24 45.12 159.59 95.09 5136.32 2132.06 -2018.99 914 . 84 2216.59 155.62 0.84 MWD M IFR+G+I
SCHLUMBERGER Survey Report 27-Jun-2004 09:06:34 Page 3 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 6013.41 45.16 155.70 96.17 5204.17 2196.91 -2082.01 940.76 2284.69 155.68 2.87 MWD M IFR+G+I
32 6109.21 44.98 157.32 95.80 5271.83 2261. 85 -2144.21 967.79 2352.50 155.71 1. 21 MWD M IFR+G+I
33 6205.94 44.84 156.49 96.73 5340.34 2327.10 -2207.03 994.58 2420.78 155.74 0.62 MWD M IFR+G+I
34 6301.09 45.05 153.08 95.15 5407.69 2391.99 -2267.82 1023.21 2487.96 155.72 2.54 MWD M IFR+G+I
35 6396.14 45.54 154.97 95.05 5474.56 2457.46 -2328.55 1052.79 2555.48 155.67 1. 50 MWD M IFR+G+I
36 6491. 71 44.68 151. 80 95.57 5542.02 2523.24 -2389.07 1083.10 2623.12 155.61 2.52 MWD M IFR+G+I .
37 6586.77 44.05 149.76 95.06 5609.98 2588.47 -2447.08 1115.54 2689.35 155.49 1. 64 MWD M IFR+G+I
38 6683.47 43.68 150.27 96.70 5679.70 2654.40 -2505.12 1149.03 2756.06 155.36 0.53 MWD M IFR+G+I
39 6779.05 43.12 151. 48 95.58 5749.14 2718.84 -2562.48 1181.00 2821.54 155.26 1. 05 MWD M IFR+G+I
40 6875.65 42.35 149.72 96.60 5820.10 2783.21 -2619.59 1213.17 2886.87 155.15 1.47 MWD M IFR+G+I
41 6971.04 42.91 147.76 95.39 5890.28 2847.02 -2674.81 1246.69 2951.07 155.01 1.51 MWD M IFR+G+I
42 7065.64 42.59 149.88 94.60 5959.75 2910.42 -2729.74 1279.94 3014.91 154.88 1. 56 MWD M IFR+G+I
43 7162.37 42.28 147.82 96.73 6031.15 2974.86 -2785.59 1313.69 3079.82 154.75 1. 47 MWD M IFR+G+I
44 7257.24 42.74 147.79 94.87 6101.08 3038.34 -2839.84 1347.85 3143.47 154.61 0.49 MWD M IFR+G+I
45 7353.47 42.30 149.20 96 .23 6172.01 3102.61 -2895.28 1381.84 3208.14 154.49 1. 09 MWD M IFR+G+I
46 7449.46 42.30 151. 50 95.99 6243.01 3166.10 -2951.42 1413.79 3272.57 154.40 1. 61 MWD M IFR+G+I
47 7544.75 42.34 151. 07 95.29 6313.47 3228.96 -3007.69 1444.62 3336.63 154.34 0.31 MWD M IFR+G+I
48 7640.53 42.78 151.72 95.78 6384.02 3292.41 -3064.56 1475.63 3401.33 154.29 0.65 MWD M IFR+G+I
49 7735.81 43.13 151.19 95.28 6453.75 3355.99 -3121. 59 1506.66 3466.17 154.24 0.53 MWD M IFR+G+I
50 7831.03 42.80 153.47 95.22 6523.43 3419.32 -3179.06 1536.79 3531.03 154.20 1. 67 MWD M IFR+G+I
51 7926.86 42.08 152.54 95.83 6594.16 3482.26 -3236.68 1566.14 3595.68 154.18 1. 00 MWD M IFR+G+I .
52 8022.34 42.56 151. 99 95.48 6664.75 3545.02 -3293.58 1596.06 3659.93 154.15 0.63 MWD M IFR+G+I
53 8118.06 41. 81 152.62 95.72 6735.68 3607.76 -3350.49 1625.93 3724.17 154.11 0.90 MWD M IFR+G+I
54 8214.33 41. 77 151. 69 96 .27 6807.46 3670.41 -3407.22 1655.90 3788.29 154.08 0.65 MWD M IFR+G+I
55 8310.06 43.22 151. 70 95.73 6878.04 3733.68 -3464.15 1686.56 3852.90 154.04 1.51 MWD M IFR+G+I
56 8406.16 43.89 152.22 96 .10 6947.69 3798.40 -3522.60 1717.69 3919.07 154.01 0.79 MWD M IFR+G+I
57 8501. 93 42.95 158.43 95.77 7017.28 3861.75 -3582.34 1745.17 3984.82 154.03 4.56 MWD M IFR+G+I
58 8597.09 44.08 158.13 95.16 7086.29 3923.88 -3643.21 1769.42 4050.16 154.10 1. 21 MWD M IFR+G+I
59 8693.56 45.79 159.35 96 .47 7154.58 3988.30 -3706.70 1794.11 4118.07 154.17 1. 98 MWD M IFR+G+I
60 8788.59 44.13 158.22 95.03 7221.82 4051.77 -3769.30 1818.40 4185.00 154.25 1. 94 MWD M IFR+G+I
SCHLUMBERGER Survey Report 27-Jun-2004 09:06:34 Page 4 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
61 8884.29 42.04 159.16 95.70 7291. 71 4113.60 -3830.20 1842.17 4250.17 154.31 2.28 MWD M IFR+G+I
62 8979.37 41. 14 157.24 95.08 7362.82 4173.46 -3888.79 1865.59 4313.14 154.37 1. 64 MWD M IFR+G+I
63 9075.49 39.43 158.22 96 .12 7436.15 4232.57 -3946.30 1889.15 4375.18 154.42 1. 90 MWD M IFR+G+I
64 9171. 06 37.72 154.61 95.57 7510.87 4289.63 -4000.91 1912.95 4434.71 154.45 2.96 MWD M IFR+G+I
65 9266.35 36.77 151.97 95.29 7586.73 4345.68 -4052.42 1938.86 4492.36 154.43 1. 95 MWD M IFR+G+I
66 9362.56 36.16 151.55 96.21 7664.10 4401.61 -4102.79 1965.91 4549.48 154.40 0.69 MWD M IFR+G+I .
67 9460.01 37.01 148.90 97.45 7742.36 4458.71 -4153.19 1994.76 4607.39 154.35 1. 84 MWD M IFR+G+I
68 9555.84 36.88 149.55 95.83 7818.95 4515.52 -4202.68 2024.23 4664.76 154.28 0.43 MWD M IFR+G+I
69 9649.45 36.84 147.77 93.61 7893.85 4570.99 -4250.63 2053.44 4720.64 154.22 1.14 MWD M IFR+G+I
70 9742.08 37.03 147.75 92.63 7967.89 4626.11 -4297.71 2083.13 4775.96 154.14 0.21 MWD M IFR+G+I
71 9841.56 37.29 148.13 99.48 8047.17 4685.59 -4348.64 2115.02 4835.70 154.06 0.35 MWD M IFR+G+I
72 9937.09 36.00 144.43 95.53 8123.82 4742.21 -4396.06 2146.64 4892.18 153.97 2.68 MWD M IFR+G+I
73 10033.35 35.80 148.15 96.26 8201.81 4798.27 -4442.99 2177.96 4948.10 153.89 2.28 MWD M IFR+G+I
74 10128.66 36.02 147.73 95.31 8279.00 4853.60 -4490.37 2207.63 5003.70 153.82 0.35 MWD M IFR+G+I
75 10224.50 36.02 148.17 95.84 8356.52 4909.38 -4538.14 2237.54 5059.77 153.75 0.27 MWD M IFR+G+I
76 10319.82 36.07 149.30 95.32 8433.59 4964.78 -4586.08 2266.65 5115.64 153.70 0.70 MWD M IFR+G+I
77 10415.28 36.35 146.87 95.46 8510.62 5020.57 -4633.94 2296.46 5171. 76 153.64 1.53 MWD M IFR+G+I
78 10510.39 34.95 145.87 95.11 8587.90 5075.63 -4680.09 2327.15 5226.75 153.56 1.59 MWD M IFR+G+I
79 10606.72 34.47 146.55 96.33 8667.09 5130.13 -4725.68 2357.66 5281.15 153.49 0.64 MWD M IFR+G+I
80 10702.48 34.19 145.75 95.76 8746.17 5183.80 -4770.53 2387.74 5334.72 153.41 0.55 MWD M IFR+G+I
81 10729.73 34.12 143.81 27.25 8768.72 5199.03 -4783.03 2396.56 5349.84 153.39 4.01 MWD M IFR+G+I .
82 10797.00 34.12 143.81 67.27 8824.41 5236.67 -4813.48 2418.84 5387.06 153.32 0.00 MWD M None
83 10807.69 35.89 145.78 10.69 8833.17 5242.78 -4818.49 2422.37 5393.12 153.31 19.64 MWD M IFR+G+I
84 10838.19 42.15 147.16 30.50 8856.85 5261. 84 -4834.50 2432.96 5412.18 153.29 20.72 MWD M IFR+G+I
85 10873.40 49.87 147.33 35.21 8881.29 5286.94 -4855.79 2446.65 5437.35 153.26 21.93 MWD M IFR+G+I
86 10902.84 55.46 148.24 29.44 8899.14 5310.10 -4875.59 2459.12 5460.64 153.23 19.15 MWD M IFR+G+I
87 10934.02 62.91 147.48 31.18 8915.10 5336.59 -4898.24 2473.36 5487.28 153.21 23.99 MWD M IFR+G+I
88 10967.11 70.53 145.76 33.09 8928.17 5366.75 -4923.60 2490.08 5517.46 153.17 23.52 MWD M IFR+G+I
89 10998.98 76.64 142.50 31.87 8937.17 5397.21 -4948.35 2508.00 5547.63 153.12 21.53 MWD M IFR+G+I
90 11016.66 80.04 139.89 17.68 8940.74 5414.52 -4961.83 2518.85 5564.56 153.09 24.06 MWD M IFR+G+I
SCHLUMBERGER Survey Report 27-Jun-2004 09:06:34 Page 5 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
91 11029.44 82.67 137.69 12.78 8942.67 5427.15 -4971.34 2527.17 5576.81 153.05 26.70 MWD M IFR+G+I
92 11060.98 89.43 136.19 31. 54 8944.84 5458.56 -4994.31 2548.64 5607.02 152.96 21.95 MWD M IFR+G+I
93 11094.64 88.60 136.78 33.66 8945.42 5492.16 -5018.72 2571.81 5639.30 152.87 3.03 MWD M IFR+G+I
94 11124.52 87.78 137.47 29.88 8946.36 5521.99 -5040.60 2592.13 5668.05 152.79 3.59 MWD M IFR+G+I
95 11158.09 87.61 13 7.15 33.57 8947.71 5555.50 -5065.26 2614.88 5700.39 152.70 1. 08 MWD M IFR+G+I
96 11189.62 87.16 137.75 31. 53 8949.15 5586.98 -5088.46 2636.18 5730.78 152.61 2.38 MWD M IFR+G+I .
97 11220.94 86.82 13 7.82 31.32 8950.79 5618.23 -5111.63 2657.19 5761.02 152.53 1.11 MWD M IFR+G+I
98 11253.30 86.18 138.47 32.36 8952.77 5650.52 -5135.68 2678.74 5792.31 152.45 2.82 MWD M IFR+G+I
99 11284.87 86.15 138.83 31.57 8954.88 5682.01 -5159.33 2699.55 5822.91 152.38 1.14 MWD M IFR+G+I
100 11315.54 88.18 13 9.05 30.67 8956.40 5712.64 -5182.43 2719.67 5852.71 152.31 6.66 MWD M IFR+G+I
101 11350.29 89.32 139.34 34.75 8957.15 5747.38 -5208.72 2742.38 5886.55 152.23 3.39 MWD M IFR+G+I
102 11382.26 89.94 140.74 31. 97 8957.36 5779.35 -5233.23 2762.91 5917.80 152.17 4.79 MWD M IFR+G+I
103 11411.69 91. 59 140.89 29.43 8956.97 5808.77 -5256.04 2781.50 5946.65 152.11 5.63 MWD M IFR+G+I
104 11445.37 93.37 140.76 33.68 8955.51 5842.41 -5282.12 2802.76 5979.65 152.05 5.30 MWD M IFR+G+I
105 11475.18 93.41 139.56 29.81 8953.75 5872.17 -5304.97 2821.82 6008.77 151. 99 4.02 MWD M IFR+G+I
106 11506.44 92.65 140.26 31. 26 8952.10 5903.38 -5328.85 2841. 92 6039.30 151. 93 3.30 MWD M IFR+G+I
107 11541.10 92.86 140.28 34.66 8950.43 5938.00 -5355.47 2864.05 6073.21 151.86 0.61 MWD M IFR+G+I
108 11572.70 94.28 139.43 31.60 8948.46 5969.54 -5379.58 2884.38 6104.06 151.80 5.23 MWD M IFR+G+I
109 11601.27 94.85 136.82 28.57 8946.19 5998.00 -5400.79 2903.39 6131.73 151.74 9.32 MWD M IFR+G+I
110 11634.84 94.93 133.62 33.57 8943.33 6031.34 -5424.52 2926.95 6163.80 151.65 9.50 MWD M IFR+G+I
111 11666.38 94.54 132.08 31.54 8940.72 6062.55 -5445.90 2949.99 6193.57 151. 56 5.02 MWD M IFR+G+I .
112 11698.90 93.90 132.77 32.52 8938.33 6094.71 -5467.78 2973.93 6224.22 151. 46 2.89 MWD M IFR+G+I
113 11732.39 93.67 132.71 33.49 8936.12 6127.88 -5490.46 2998.47 6255.88 151. 36 0.71 MWD M IFR+G+I
114 11764.54 93.34 131.76 32.15 8934.15 6159.70 -5512.03 3022.23 6286.20 151. 26 3.12 MWD M IFR+G+I
115 11795.28 92.79 133.34 30.74 8932.51 6190.15 -5532.79 3044.85 6315.28 151. 17 5.44 MWD M IFR+G+I
116 11826.86 93.68 133.75 31.58 8930.73 6221.49 -5554.51 3067.70 6345.34 151. 09 3.10 MWD M IFR+G+I
117 11860.38 94.38 131.94 33.52 8928.37 6254.69 -5577.24 3092.21 6377.10 150.99 5.78 MWD M IFR+G+I
118 11889.84 94.03 132.49 29.46 8926.21 6283.81 -5596.98 3113.97 6404.93 150.91 2.21 MWD M IFR+G+I
119 11923.21 93.14 13 0.90 33.37 8924.12 6316.79 -5619.14 3138.84 6436.38 150.81 5.45 MWD M IFR+G+I
120 11955.35 91.47 129.05 32.14 8922.83 6348.43 -5639.77 3163.45 6466.40 150.71 7.75 MWD M IFR+G+I
SCHLUMBERGER Survey Report
27-Jun-2004 09:06:34
Page
6 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Srvy
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
121 11987.15 92.17 126.98 31. 80 8921.82 6379.55 -5659.34 3188.49 6495.74 150.60 6.87 MWD M IFR+G+I
-
122 12139.00 92.50 115.00 151.85 8915.61 6522.95 -5737.32 3318.32 6627.83 149.96 7.89 MWD M Projection
[(c)2004 IDEAL ID8 1C_01J
.
.
~
SCRLUMBERGER
Survey report
Client........ ....... ....: BP Exploration (Alaska) Inc.
Field............ ........: Prudhoe Bay Unit
Well. . . . . . . . . . . . . . . . . . . . .: A-30A PB2
API number....... ........: 50-029-21372-71
Engineer...... ....... ....: M. Dammeyer
Rig:..... ....... .........: Nabors 7ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.. ...: Minimum curvature
Method for DLS. ...... ....: Mason & Taylor
----- Depth reference -----------------------
Permanent datum....... ...: Mean Sea Level
Depth reference..... .....: Driller's pipe Tally
GL above permanent.......: 51.37 ft
KB above permanent.......: 0.00 ft
DF above permanent.......: 80.07 ft
----- Vertical section origin----------------
Latitude (+N/S-) .........: 0.00 ft
Departure (+E/W-)..... ...: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-) ........: -999.25 ft
Azimuth from rotary table to target: 139.75 degrees
iiE(;EIVED
AUG:S¡ 2004
AJ!:I""
wn80i1 Ii Gas Cons. Com . .
~ RUSeion
27-Jun-2004 08:13:35
Spud date. ...............:
Last survey date. . . . . . . . . :
Total accepted surveys...:
MD of first survey... ....:
MD of last survey........:
¿{o c/-O 7 P'
Page
1 of 6
29-May-04
18-Jun-04
139
3399.19 ft
12937.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2003
Magnetic date............: 30-May-2004
Magnetic field strength..: 1151.76 RCNT
Magnetic dec (+E/W-) .....: 25.20 degrees
Magnetic dip.............: 80.83 degrees
----- MWD survey Reference
Reference G.... ... .... ...:
Reference R..............:
Reference Dip. . . . . . . . . . . . :
Tolerance of G...........:
Tolerance of R.... .......:
Tolerance of Dip.... .....:
Criteria ---------
1002.68 mGal
1151.76 RCNT
80.83 degrees
(+/-) 2.50 mGal
(+/-) 6.00 RCNT
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 25.20 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 25.20 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
T=Trend Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
.
SCHLUMBERGER Survey Report 27-Jun-2004 09:33:07 Page 2 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 3399.19 33.07 144.81 0.00 3302.30 487.30 -436.64 238.41 497.49 151. 37 0.00 TIP None
2 3446.00 34.28 144.91 46.81 3341.25 513 . 15 -457.86 253.35 523.28 151.04 2.59 MWD M IFR+I
3 3462.00 35.77 147.02 16.00 3354.36 522.28 -465.48 258.48 532.43 150.96 12.00 MWD M IFR+I
4 3474.00 35.77 147.02 12.00 3364.09 529.24 -471.36 262.30 539.43 150.90 0.00 MWD M IFR+I
5 3527.08 38.45 149.64 53.08 3406.42 560.89 -498.62 279.09 571.41 150.76 5.86 MWD M IFR+I
6 3621.83 43.30 159.69 94.75 3478.12 620.56 -554.60 305.30 633.09 151. 17 8.61 MWD M IFR+I .
7 3718.63 43.67 163.56 96.80 3548.37 682.35 -617.80 326.29 698.67 152.16 2.78 MWD M IFR+I
8 3813.92 43.65 155.57 95.29 3617.36 744.14 -679.34 349.22 763.85 152.79 5.79 MWD M IFR+I
9 3910.27 43.54 153.24 96.35 3687.14 808.40 -739.26 377.92 830.25 152.92 1. 67 MWD M IFR+I
10 4005.51 42.92 156.24 95.24 3756.54 871. 40 -798.23 405.75 895.44 153.06 2.25 MWD M IFR+I
11 4100.45 42.26 156.44 94.94 3826.44 932.98 -857.08 431.54 959.59 153.27 0.71 MWD M IFR+I
12 4196.49 43.37 157.38 96.04 3896.89 995.34 -917.12 457.13 1024.74 153.51 1. 33 MWD M IFR+I
13 4293.03 43.10 156.98 96.54 3967.22 1058.43 -978.08 482.78 1090.74 153.73 0.40 MWD M IFR+I
14 4387.20 44.06 155.31 94.17 4035.44 1120.71 -1037.44 509.04 1155.60 153.86 1.59 MWD M IFR+I
15 4483.97 43.23 156.12 96.77 4105.47 1184.92 -1098.32 536.51 1222.35 153.97 1. 03 MWD M IFR+I
16 4579.76 43.99 156.79 95.79 4174.83 1248.20 -1158.89 562.90 1288.36 154.09 0.93 MWD M IFR+I
17 4675.82 43.98 155.63 96.06 4243.94 1312.18 -1219.93 589.81 1355.03 154.20 0.84 MWD M IFR+I
18 4770.96 43.07 154.85 95.14 4312.93 1375.31 -1279.42 617.24 1420.53 154.25 1.11 MWD M IFR+I
19 4866.63 44.11 158.69 95.67 4382.23 1438.36 -1340.02 643.23 1486.41 154.36 2.97 MWD M IFR+I
20 4962.36 43.31 158.86 95.73 4451. 43 1500.89 -1401.69 667.18 1552.37 154.55 0.84 MWD M IFR+I
21 5057.71 44.25 159.71 95.35 4520.27 1563.07 -1463.39 690.51 1618.12 154.74 1.16 MWD M IFR+I .
22 5153.11 43.97 159.36 95.40 4588.77 1625.55 -1525.60 713.73 1684.30 154.93 0.39 MWD M IFR+I
23 5249.30 44.35 158.18 96.19 4657.78 1688.90 -1588.07 738.00 1751.17 155.08 0.94 MWD M IFR+I
24 5344.71 43.57 155.57 95.41 4726.46 1752.18 -1648.97 763.99 1817.35 155.14 2.07 MWD M IFR+I
25 5439.95 44.88 158.55 95.24 4794.72 1815.58 -1710.13 789.86 1883.73 155.21 2.58 MWD M IFR+I
26 5535.36 44.55 156.22 95.41 4862.52 1879.54 -1772.09 815.66 1950.80 155.28 1. 75 MWD M IFR+I
27 5631.47 43.62 156.08 96.11 4931.56 1943.68 -1833.25 842.70 2017.66 155.31 0.97 MWD M IFR+I
28 5726.11 43.66 157.91 94.64 5000.05 2006.06 -1893.36 868.22 2082.94 155.37 1. 34 MWD M IFR+I
29 5822.15 44.66 160.52 96.04 5068.95 2069.12 -1955.91 891. 95 2149.69 155.49 2.16 MWD M IFR+I
30 5917.24 45.12 159.59 95.09 5136.32 2132.06 -2018.99 914 . 84 2216.59 155.62 0.84 MWD M IFR+I
SCHLUMBERGER Survey Report 27-Jun-2004 09:33:07 Page 3 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 6013.41 45.16 155.70 96 .17 5204.17 2196.91 -2082.01 940.76 2284.69 155.68 2.87 MWD M IFR+I
32 6109.21 44.98 157.32 95.80 5271.83 2261.85 -2144.21 967.79 2352.50 155.71 1. 21 MWD M IFR+I
33 6205.94 44.84 156.49 96.73 5340.34 2327.10 -2207.03 994.58 2420.78 155.74 0.62 MWD M IFR+I
34 6301.09 45.05 153.08 95.15 5407.69 2391.99 -2267.82 1023.21 2487.96 155.72 2.54 MWD M IFR+I
35 6396.14 45.54 154.97 95.05 5474.56 2457.46 -2328.55 1052.79 2555.48 155.67 1. 50 MWD M IFR+I
36 6491.71 44.68 151.80 95.57 5542.02 2523.24 -2389.07 1083.10 2623.12 155.61 2.52 MWD M IFR+I .
37 6586.77 44.05 149.76 95.06 5609.98 2588.47 -2447.08 1115.54 2689.35 155.49 1. 64 MWD M IFR+I
38 6683.47 43.68 150.27 96.70 5679.70 2654.40 -2505.12 1149.03 2756.06 155.36 0.53 MWD M IFR+I
39 6779.05 43.12 151. 48 95.58 5749.14 2718.84 -2562.48 1181.00 2821. 54 155.26 1. 05 MWD M IFR+I
40 6875.65 42.35 149.72 96.60 5820.10 2783.21 -2619.59 1213.17 2886.87 155.15 1.47 MWD M IFR+I
41 6971. 04 42.91 147.76 95.39 5890.28 2847.02 -2674.81 1246.69 2951.07 155.01 1. 51 MWD M IFR+I
42 7065.64 42.59 149.88 94.60 5959.75 2910.42 -2729.74 1279.94 3014.91 154.88 1. 56 MWD M IFR+I
43 7162.37 42.28 147.82 96.73 6031.15 2974.86 -2785.59 1313.69 3079.82 154.75 1.47 MWD M IFR+I
44 7257.24 42.74 147.79 94.87 6101.08 3038.34 -2839.84 1347.85 3143.47 154.61 0.49 MWD M IFR+I
45 7353.47 42.30 149.20 96.23 6172.01 3102.61 -2895.28 1381. 84 3208.14 154.49 1. 09 MWD M IFR+I
46 7449.46 42.30 151.50 95.99 6243.01 3166.10 -2951.42 1413.79 3272.57 154.40 1. 61 MWD M IFR+I
47 7544.75 42.34 151. 07 95.29 6313.47 3228.96 -3007.69 1444.62 3336.63 154.34 0.31 MWD M IFR+I
48 7640.53 42.78 151.72 95.78 6384.02 3292.41 -3064.56 1475.63 3401.33 154.29 0.65 MWD M IFR+I
49 7735.81 43.13 151.19 95.28 6453.75 3355.99 -3121. 59 1506.66 3466.17 154.24 0.53 MWD M IFR+I
50 7831.03 42.80 153.47 95.22 6523.43 3419.32 -3179.06 1536.79 3531.03 154.20 1. 67 MWD M IFR+I
51 7926.86 42.08 152.54 95.83 6594.16 3482.26 -3236.68 1566.14 3595.68 154.18 1. 00 MWD M IFR+I .
52 8022.34 42.56 151. 99 95.48 6664.75 3545.02 -3293.58 1596.06 3659.93 154.15 0.63 MWD M IFR+I
53 8118.06 41. 81 152.62 95.72 6735.68 3607.76 -3350.49 1625.93 3724.17 154 . 11 0.90 MWD M IFR+I
54 8214.33 41.77 151.69 96.27 6807.46 3670.41 -3407.22 1655.90 3788.29 154.08 0.65 MWD M IFR+I
55 8310.06 43.22 151.70 95.73 6878.04 3733.68 -3464.15 1686.56 3852.90 154.04 1. 51 MWD M IFR+I
56 8406.16 43.89 152.22 96 .10 6947.69 3798.40 -3522.60 1717.69 3919.07 154.01 0.79 MWD M IFR+I
57 8501.93 42.95 158.43 95.77 7017.28 3861.75 -3582.34 1745.17 3984.82 154.03 4.56 MWD M IFR+I
58 8597.09 44.08 158.13 95.16 7086.29 3923.88 -3643.21 1769.42 4050.16 154.10 1.21 MWD M IFR+I
59 8693.56 45.79 159.35 96.47 7154.58 3988.30 -3706.70 1794.11 4118.07 154.17 1. 98 MWD M IFR+I
60 8788.59 44.13 158.22 95.03 7221.82 4051.77 -3769.30 1818.40 4185.00 154.25 1. 94 MWD M IFR+I
SCHLUMBERGER Survey Report 27-Jun-2004 09:33:07 Page 4 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
61 8884.29 42.04 159.16 95.70 7291.71 4113.60 -3830.20 1842.17 4250.17 154.31 2.28 MWD M IFR+I
62 8979.37 41. 14 157.24 95.08 7362.82 4173.46 -3888.79 1865.59 4313.14 154.37 1. 64 MWD M IFR+I
63 9075.49 39.43 158.22 96 .12 7436.15 4232.57 -3946.30 1889.15 4375.18 154.42 1. 90 MWD M IFR+I
64 9171. 06 37.72 154.61 95.57 7510.87 4289.63 -4000.91 1912.95 4434.71 154.45 2.96 MWD M IFR+I
65 9266.35 36.77 151. 97 95.29 7586.73 4345.68 -4052.42 1938.86 4492.36 154.43 1. 95 MWD M IFR+I
66 9362.56 36.16 151. 55 96.21 7664.10 4401. 61 -4102.79 1965.91 4549.48 154.40 0.69 MWD M IFR+I .
67 9460.01 37.01 148.90 97.45 7742.36 4458.71 -4153.19 1994.76 4607.39 154.35 1. 84 MWD M IFR+I
68 9555.84 36.88 149.55 95.83 7818.95 4515.52 -4202.68 2024.23 4664.76 154.28 0.43 MWD M IFR+I
69 9649.45 36.84 147.77 93.61 7893.85 4570.99 -4250.63 2053.44 4720.64 154.22 1.14 MWD M IFR+I
70 9742.08 37.03 147.75 92.63 7967.89 4626.11 -4297.71 2083.13 4775.96 154.14 0.21 MWD M IFR+I
71 9841.56 37.29 148.13 99.48 8047.17 4685.59 -4348.64 2115.02 4835.70 154.06 0.35 MWD M IFR+I
72 9937.09 36.00 144.43 95.53 8123.82 4742.21 -4396.06 2146.64 4892.18 153.97 2.68 MWD M IFR+I
73 10033.35 35.80 148.15 96 .26 8201.81 4798.27 -4442.99 2177.96 4948.10 153.89 2.28 MWD M IFR+I
74 10128.66 36.02 147.73 95.31 8279.00 4853.60 -4490.37 2207.63 5003.70 153.82 0.35 MWD M IFR+I
75 10224.50 36.02 148.17 95.84 8356.52 4909.38 -4538.14 2237.54 5059.77 153.75 0.27 MWD M IFR+I
76 10319.82 36.07 149.30 95.32 8433.59 4964.78 -4586.08 2266.65 5115.64 153.70 0.70 MWD M IFR+I
77 10415.28 36.35 146.87 95.46 8510.62 5020.57 -4633.94 2296.46 5171. 76 153.64 1. 53 MWD M IFR+I
78 10510.39 34.95 145.87 95.11 8587.90 5075.63 -4680.09 2327.15 5226.75 153.56 1. 59 MWD M IFR+I
79 10606.72 34.47 146.55 96.33 8667.09 5130.13 -4725.68 2357.66 5281.15 153.49 0.64 MWD M IFR+I
80 10702.48 34.19 145.75 95.76 8746.17 5183.80 -4770.53 2387.74 5334.72 153.41 0.55 MWD M IFR+I
81 10729.73 34.12 143.81 27.25 8768.72 5199.03 -4783.03 2396.56 5349.84 153.39 4.01 MWD M IFR+I .
82 10797.00 34.12 143.81 67.27 8824.41 5236.67 -4813.48 2418.84 5387.06 153.32 0.00 MWD M IFR+I
83 10807.69 35.89 145.78 10.69 8833.17 5242.78 -4818.49 2422.37 5393.12 153.31 19.64 MWD M IFR+I
84 10838.19 42.15 147.16 30.50 8856.85 5261. 84 -4834.50 2432.96 5412.18 153.29 20.72 MWD M IFR+I
85 10873.40 49.87 147.33 35.21 8881.29 5286.94 -4855.79 2446.65 5437.35 153.26 21.93 MWD M IFR+I
86 10902.84 55.46 148.24 29.44 8899.14 5310.10 -4875.59 2459.12 5460.64 153.23 19.15 MWD M IFR+I
87 10934.02 62.91 147.48 31.18 8915.10 5336.59 -4898.24 2473.36 5487.28 153.21 23.99 MWD M IFR+I
88 10967.11 70.53 145.76 33.09 8928.17 5366.75 -4923.60 2490.08 5517.46 153.17 23.52 MWD M IFR+I
89 10998.98 76.64 142.50 31.87 8937.17 5397.21 -4948.35 2508.00 5547.63 153.12 21. 53 MWD M IFR+I
90 11016.66 80.04 139.89 17.68 8940.74 5414.52 -4961.83 2518.85 5564.56 153.09 24.06 MWD M IFR+I
SCHLUMBERGER Survey Report 27-Jun-2004 09:33:07 Page 5 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
91 11029.44 82.67 137.69 12.78 8942.67 5427.15 -4971.34 2527.17 5576.81 153.05 26.70 MWD M IFR+I
92 11060.98 89.43 136.19 31. 54 8944.84 5458.56 -4994.31 2548.64 5607.02 152.96 21. 95 MWD M IFR+I
93 11094.64 88.60 136.78 33.66 8945.42 5492.16 -5018.72 2571.81 5639.30 152.87 3.03 MWD M IFR+I
94 11124.52 87.78 137.47 29.88 8946.36 5521.99 -5040.60 2592.13 5668.05 152.79 3.59 MWD M IFR+I
95 11158.09 87.61 137.15 33.57 8947.71 5555.50 -5065.26 2614.88 5700.39 152.70 1. 08 MWD M IFR+I
96 11189.62 87.16 137.75 31. 53 8949.15 5586.98 -5088.46 2636.18 5730.78 152.61 2.38 MWD M IFR+I .
97 11220.94 86.82 137.82 31.32 8950.79 5618.23 -5111.63 2657.19 5761.02 152.53 1.11 MWD M IFR+I
98 11253.30 86.18 138.47 32.36 8952.77 5650.52 -5135.68 2678.74 5792.31 152.45 2.82 MWD M IFR+I
99 11284.87 86.15 138.83 31.57 8954.88 5682.01 -5159.33 2699.55 5822.91 152.38 1.14 MWD M IFR+I
100 11315.54 88.18 139.05 30.67 8956.40 5712.64 -5182.43 2719.67 5852.71 152.31 6.66 MWD M IFR+I
101 11350.29 89.32 139.34 34.75 8957.15 5747.38 -5208.72 2742.38 5886.55 152.23 3.39 MWD M IFR+I
102 11382.26 89.94 140.74 31.97 8957.36 5779.35 -5233.23 2762.91 5917.80 152.17 4.79 MWD M IFR+I
103 11419.23 88.39 140.75 36.97 8957.90 5816.31 -5261.85 2786.30 5954.03 152.10 4.19 MWD M IFR+I+T
104 11449.70 88.08 140.45 30.47 8958.84 5846.76 -5285.38 2805.63 5983.88 152.04 1.42 MWD M IFR+I+T
105 11482.36 90.27 136.93 32.66 8959.31 5879.40 -5309.91 2827.18 6015.65 151.97 12.69 MWD M IFR+I+T
106 11513.31 90.14 131. 97 30.95 8959.20 5910.21 -5331.57 2849.27 6045.17 151. 88 16.03 MWD M IFR+I+T
107 11544.24 90.27 127.21 30.93 8959.09 5940.65 -5351.28 2873.10 6073.79 151. 77 15.39 MWD M IFR+I+T
108 11578.55 90.14 124.28 34.31 8958.96 5973.93 -5371.32 2900.94 6104.63 151. 63 8.55 MWD M IFR+I+T
109 11610.61 91.40 119.40 32.06 8958.53 6004.43 -5388.23 2928.17 6132.47 151. 48 15.72 MWD M IFR+I+T
110 11639.59 91. 71 114.26 28.98 8957.75 6031.10 -5401.30 2954.01 6156.31 151. 33 17.76 MWD M IFR+I+T
111 11672 .36 91.65 110.28 32.77 8956.79 6060.16 -5413.71 2984.31 6181.78 151.13 12.14 MWD M IFR+I+T .
112 11704.32 91.37 105.45 31.96 8955.94 6087.28 -5423.51 3014.71 6205.07 150.93 15.13 MWD M IFR+I+T
113 11736.03 91.44 100.70 31.71 8955.17 6112.69 -5430.68 3045.58 6226.38 150.72 14.98 MWD M IFR+I+T
114 11769.72 90.99 100.92 33.69 8954.45 6138.89 -5436.99 3078.67 6248.13 150.48 1.49 MWD M IFR+I+T
115 11801.81 90.72 100.65 32.09 8953.97 6163.84 -5443.00 3110.19 6268.93 150.26 1.19 MWD M IFR+I+T
116 11832.22 90.41 101.96 30.41 8953.67 6187.65 -5448.96 3140.01 6288.94 150.05 4.43 MWD M IFR+I+T
117 11863.85 89.28 102.23 31.63 8953.76 6212.70 -5455.59 3170.93 6310.17 149.83 3.67 MWD M IFR+I+T
118 11896.07 88.32 104.37 32.22 8954.43 6238.61 -5463.00 3202.28 6332.37 149.62 7.28 MWD M IFR+I+T
119 11928.06 88.59 110.02 31.99 8955.30 6265.55 -5472.45 3232.82 6356.00 149.43 17.68 MWD M IFR+I+T
120 11960.51 90.34 114.40 32.45 8955.60 6294.31 -5484.71 3262.85 6381.87 149.25 14.53 MWD M IFR+I+T
SCHLUMBERGER Survey Report 27-Jun-2004 09:33:07 Page 6 of 6
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
121 11991. 64 92.37 118.24 31.13 8954.86 6322.86 -5498.50 3290.74 6408.00 149.10 13.95 MWD M IFR+I+T
122 12022.49 93.33 117.52 30.85 8953.33 6351.45 -5512.91 3317.97 6434.37 148.96 3.89 MWD M IFR+I+T
123 12056.31 93.19 116.64 33.82 8951.41 6382.61 -5528.28 3348.03 6463.07 148.80 2.63 MWD M IFR+I+T
124 12088.50 92.71 116.77 32.19 8949.75 6412.19 -5542.73 3376.75 6490.32 148.65 1. 54 MWD M IFR+I+T
125 12118.01 92.06 116.95 29.51 8948.52 6439.35 -5556.05 3403.06 6515.40 148.51 2.29 MWD M IFR+I+T
126 12151.64 91. 65 118.35 33.63 8947.43 6470.50 -5571.65 3432.83 6544.28 148.36 4.34 MWD M IFR+I+T .
127 12185.04 91.10 120.48 33.40 8946.63 6501.80 -5588.05 3461.91 6573.52 148.22 6.58 MWD M IFR+I+T
128 12216.16 92.61 119.09 31. 12 8945.62 6531.04 -5603.50 3488.91 6600.88 148.09 6.59 MWD M IFR+I+T
129 12247.46 93.91 119.17 31. 30 8943.84 6560.28 -5618.71 3516.20 6628.24 147.96 4.16 MWD M IFR+I+T
130 12279.59 93.02 119.62 32.13 8941.90 6590.35 -5634.45 3544.15 6656.43 147.83 3.10 MWD M IFR+I+T
131 12311.05 93.05 121. 57 31.46 8940.24 6620.03 -5650.44 3571.19 6684.37 147.71 6.19 MWD M IFR+I+T
132 12343.27 92.26 121. 37 32.22 8938.74 6650.59 -5667.24 3598.64 6713.26 147.58 2.53 MWD M IFR+I+T
133 12375.05 91. 92 120.77 31.78 8937.58 6680.67 -5683.63 3625.84 6741.69 147.46 2.17 MWD M IFR+I+T
134 12407.10 92.88 11 7. 04 32.05 8936.24 6710.59 -5699.11 3653.87 6769.83 147.33 12.01 MWD M IFR+I+T
135 12440.69 93.12 111.59 33.59 8934.48 6740.88 -5712.91 3684.42 6797.97 147.18 16.22 MWD M IFR+I+T
136 12470.92 92.91 113.68 30.23 8932.89 6767.74 -5724.53 3712.29 6822.85 147.04 6.94 MWD M IFR+I+T
137 12502.47 92.06 112.45 31. 55 8931.52 6795.91 -5736.88 3741.28 6849.01 146.89 4.74 MWD M IFR+I+T
138 12534.72 90.31 113.88 32.25 8930.86 6824.74 -5749.56 3770.93 6875.85 146.74 7.01 MWD M IFR+I+T
139 12567.30 88.90 113.08 32.58 8931.08 6853.95 -5762.54 3800.81 6903.12 146.59 4.98 MWD M IFR+I+T
140 12597.50 88.60 114.79 30.20 8931.74 6881.13 -5774.79 3828.40 6928.56 146.46 5.75 MWD M IFR+I+T
141 12631.46 90.69 115.17 33.96 8931.95 6911.96 -5789.13 3859.18 6957.54 146.31 6.26 MWD M IFR+I+T .
142 12662.87 90.14 114.84 31.41 8931.72 6940.49 -5802.41 3887.65 6984.39 146.18 2.04 MWD M IFR+I+T
143 12692.34 92.34 115.17 29.47 8931.08 6967.25 -5814.86 3914.35 7009.62 146.05 7.55 MWD M IFR+I+T
144 12724.58 92.02 116.29 32.24 8929.86 6996.67 -5828.85 3943.37 7037.45 145.92 3.61 MWD M IFR+I+T
145 12757.82 93.32 114.04 33.24 8928.31 7026.86 -5842.97 3973.42 7066.00 145.78 7.81 MWD M IFR+I+T
146 12789.46 94.39 110.45 31. 64 8926.18 7054.86 -5854.92 4002.63 7092.33 145.64 11.82 MWD M IFR+I+T
147 12821.81 94.02 103.69 32.35 8923.81 7082.00 -5864.38 4033.46 7117.56 145.48 20.87 MWD M IFR+I+T
148 12853.19 94.25 103.26 31.38 8921.54 7107.23 -5871.67 4063.89 7140.85 145.31 1. 55 MWD M IFR+I+T
149 12937.00 93.94 103.26 83.81 8915.56 7174.44 -5890.85 4145.26 7203.14 144.87 0.37 MWD M Projection
[(c)2004 IDEAL ID8_1C_OIJ
.
RCCCIVCD
AI ~. r"o004
UG ,,! ¡ ¿
Alaska Oil & Gas Cons. Commission
Anchorage
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason
Well No A-30 Date Dispatched: 29-May-04
Installation/Rig 11.1.11.1 Dispatched By: J. Bosse
Data No Of Prints No of Floppies
Surveys
Received By:
þ/l I /;
/Vh¡.l(Â~
"
LWD Log Delivery V 1.1 , 10-02-03
2
ûj~/j
Please sign and return to:
Drilling & Measurements LWD Division
2525 Gambell Street, Suite 400
Anchorage, Alaska 99503
nrosel@slb.com
Fax: 907-561-8417
Schlumberger Private
~o1-tJ7)þ
lJIJJFl[ C
j.ocf-071
RECEIVED
AUG 3 '1 2004
AI.OU&GasQ)ns.Commisskm
AndIorage
.
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason
Well No A-30A PB1 Date Dispatched: 29-May-04
Installation/Rig 11.1.1..1 Dispatched By: J. Bosse
Data No Of Prints No of Floppies
Surveys
2
Received By:
I") /
l~~~~
r )~~~)
Please sign and return to:
Drilling & Measurements LWD Division
2525 Gambell Street, Suite 400
Anchorage, Alaska 99503
nrosel@slb.com
Fax: 907-561-8417
LWD Log Delivery V 1.1 , 10-02-03
Schlumberger Private
Lv Jl F;'lz-
RECEIVED
.
.
J. 01- 0 71'
AUG 3 í 2004
J.1aska Oil & Gas Cons. Commission
Anchorage
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Robin Deason
Well No A-30A PB2 Date Dispatched: 29-May-04
Installation/Rig ...... ... Dispatched By: J. Bosse
I... No Of Prints No of Floppies
Surveys
2
Received By:
W
r .~
t J^,~ ~J
Please sign and return to: James H. Johnson
BP Exploration (Alaska) Inc.
Petrotechnical Data Center (LR2-')
900 E. Benson Blvd.
Anchorage, Alaska 99508
Fax: 907 -564-4005
e-mail address:johnsojh@bp.com
LWD Log Delivery V 1.1 , 10-02-03
Schlumberger Private
W,ll F:'(-L
e
.
AOGCC Memorandum
Date: June 10, 2004
To: PTD 204-078
From:
Jim Regg, Petroleum Engineer
K:t?11 {;/tO/oÅ:
Subject:
Well Kick at PBU A-30A
John Crisp relayed a call from Nabors 7ES rig representative notifying the Commission of a
small kick last night at Prudhoe Bay Well A-30A. The well was drilling ahead at 8936 ft TVD;
stopped to do a flow check and notices the well flowing. Rig crew raised mud wt from 8.7 ppg
to 8.9 ppg in response; currently circulating the kick out. Well has 180 psi on drill pipe, 110 psi
on csg; believe the pressure may be from adjacent water injectors on A-pad; in process of
shutting in the injectors on pad.
.
F"t r {
11\\ :
~~FU
.
FRANK H. MURKOWSKI, GOVERNOR
~1,ASIiA. OIL AND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Bill Isaacson
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay A-30A
BP Exploration (Alaska) Inc.
Permit No: 204-078
Surface Location: 2099' NSL, 1014' WEL, SEC. 35, TIIN, R13E, UM
Bottomhole Location: 1340' NSL, 1189' WEL, SEC. 01, TlON, Rl3E, UM
Dear Mr. Isaacson:
Enclosed is the approved application for permit to redrill the above development welL
This permit to redrill does not exempt you ITom obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission witness any required test. Contact the
Commission's petroleum field inspector at (907) 65g 6 (pager).
BY ORDER 0.r;{HE COMMISSION
DATED thisJIl!. day of May, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
1a. Type of work 0 Drill
ORe-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2099' NSL, 1014' WEL, SEC. 35, T11N, R13E, UM
Top of Productive Horizon:
2164' NSL, 3512' WEL, SEC. 01, nON, R13E, UM
Total Depth:
1340' NSL" 1189' WEL, SEC. 01, T10N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 654398 y- 5947265 Zone- ASP4
16. Deviated Wells:
Kickoff Depth
18. casing Program
Size
Casinç¡
7"
. STATE OF ALASKA' .
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 MC 25.005
/1 b. Current Well Class 0 Exploratory III Development Oil 0 Multiple Zone
o Stratigraphic Test 0 Service 0 Development Gas 0 Single Zone
5. Bond: 181 Blanket 0 Single Well 11. Well Name and Number:
Bond No. 2S100302630-277 PBU A-30A
6. Proposed Depth: 12. Field / Pool(s):
MD13969 TVD 8894 Prudhoe Bay Field / Prudhoe)ay
7. Property Designation: Pool
ADL 047472
\1'.1 4 A- s I ¡ t.'> { 2..00 4-
III Redrill
8. Land Use Permit:
13. Approximate ~. ! te:
t!;b~~,§JØ4
14. Distance to Nearest Property:
12385'
9. Acres in Property:
2560
Hole
8-1/2"
6-1/8"
Lenç¡th
7449'
3345'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 80.88' feet 770' away from X-06
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3200 psig Surface: 2350 psig
Setting Oe)~h QuantityöfÇørnent
Top .. .. . ........ ... .·Sottom (c.f;·orsacks)
MD rvD MD rvD (including staç¡e data)
3325' 3240' 10774' 8814' 1196 cu ft 'G', 196 cu ft Class 'G'
10624' 8692' 13969' 8894' 44~u ftClas.s 'G'
rtì::CCJVCf)
4-1/2"
Weiç¡ht
26#
12.6#
Maximum Hole Angle
Specifications
Grade Couplinç¡
L-80 BTC-M
L-80 IBT-M
97°
3475 ft
MAr 0 1200
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND fì~nx..operationS) 4
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth M D (ft ):Effec(¡~ '~~;;ts. dunk I ~Ured):
11240 9211 3765 3600 3466 An wfflm
Cement Volume .... .
Structural
Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110'
Surface 2677' 13-3/8" 3746 cu ft Permafrost 2677' 2652'
Intermediate 10752' 9-5/8" 2065 cu ft Class 'G', 230 cu ft 'G' 10752' 8815'
Production
Liner 744' 7" 254 cu ft Class 'G' 10496' - 11240' 8609' - 9211'
20. Attachments 181 Filing Fee, $100 0 BOP Sketch
o Property Plat 0 Diverter Sketch
perfOration Depth rvD (ft): None
181 Drilling Program 0 Time vs Depth Plot
o Seabed Report 181 Drilling Fluid Program
o Shallow Hazard Analysis
181 20 AAC 25.050 Requirements
Date:
Contact Dave Wesley, 564-5153
Perforation Depth MD (ft): None
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Billlsaacson Title Senior Drilling Engineer
Permit To Drill
Number:.20 ~ - 07? 50-029-21372-01-00
Conditions of Approval: Samples Required 0 Yes ptNo
Hydrogen Sulfide Measures %Yes 0 No
ßO I 'SSÖO r~t',
Permit
Date:
Mud Log
Directional Survey Required
Prepared By Name/Number:
Terrie Hubble. 564-4628
Phone
564-5521
I See cover letter for
other requirements
CJ Yes J8[ No
]:&Yes 0 No
Approved B :
Form 10-40
BY ORDER OF
THE COMMISSION
Date ~jt:re
Well
A-30A
.
.
Planned Well Summary
I I
II Target
Objective
Well
Type
Horizontal
Sidetrack
Zone 48
I AFE Number: I P80 4P2187 I
I API Number: I 50-029-21372-01
Surface Northing Easting Offsets 1 TRS I
location 5,947,265.00 654,398.00 2,099' FSL / 1,013' FEL 11 N, 13 E, 35 t"
Target Northing Easting I Offsets 1 TRS 1/
location 5,942,110.00 657,290.00 2,164' FSL / 1,768' FWL 10 N, 13 E, 01
Bottom Northing Easting Offsets I TRS 1/
location 5,941,335.00 659,630.00 1,340' FSL/ 1,189' FEL 10 N,13 E, 01
I Planned KOP: I 3,475' md
I Rig:
1 Nabors 7ES 1
Approved Well plan:
Maximum Hole Inclination:
Proximity Issues:
Survey Program:
Nearest Well within pool:
Nearest Property Line
Hole Section:
8 Y2" intermediate:
6 1/8" production:
Cased Hole:
Open Hole:
A-30A Sidetrack
I Planned TD: 113,969' md
I BFE:
152.92'
I RTE:
180.92'
Directional Proaram
Wp04 I Exit point: I 3,475' md 1 3,286' sstvd
-330 at 3,400' in the original well bore. -96.00 in the planned 6 1/8"
horizontal section from 13,450' md to TD at 13,969' md.
There are two close approach issues in drilling A-30A. A-20, with a
center-to-center distance of 947' at 11,900' md; X-06, with a center-to-
center distance of 853' at 13, 725' md. All other surrounding wells pass
major risk criteria.
Standard MWD with IIFR 1 Cassandra.
,/
Well X-06, with center-to-center distance of 770' at 13,969' md.
12,385' to the nearest PBU property line.
loaaina Proaram
Required Sensors / Service
Real time MWD Dir/GRlPWD throughout the interval. Resistivity required in the
upper section. May be removed if bit trip occurs below the CM3.
Real time MWD Dir/GRlRes throughout the interval. Two sample catchers will
be required at company man call out.
None planned
None planned
Page 1
.
.
Mud Proaram
Type
LSND
Hole Section 1 operation:
I Density (ppg) I Viscosity I PV
9.3 50 - 60 10- 15
Type
LSND
Hole Section 1 operation:
I Density (ppg) I Viscosity I PV
9.3-10.8 45-55 12-15
Type
LSND
Hole Section 1 operation:
I Density lP159) I Viscosity I PV
10.8 ·ú.J.ø~/ 45 - 55 12 -15
./
Hole Section 1 operation:
Type I Dens~· Pfg) I Viscosity I PV
LSND 1.Q/ 45 - 55 12 - 15
~/
Hole Section 1 operation:
Type I Density (ppg) I Viscosity I PV
FloPro SF 8.5 - 8.6 45 - 55 8 - 12
Set Whip stock I mill window in 9 5/8" casing
YP I Tau 0 I API FL I pH
40+ 5 - 9 5 - 7 9.0 - 9.5
Drilling 8 W' interval window to -200' above THRZ
YP I Tau 0 I API FL I pH
25 - 33 3 - 7 4 - 6 9.0
Drilling 8 W' interval from -9,100' to BHRZ
YP I Tau 0 I API FL I
25 - 33 3 - 7 5 - 7
pH
9.0
Drilling 8 W' interval from BHRZ to section TD
YP I Tau 0 I API FL I pH
25 - 33 3 - 7 4 - 5 9.0
Drilling 6 1/8" production interval
YP I MBT I API FL
25 - 30 <3 4 - 6
pH
9.0-9.5
Casina I Tubina Proaram
Hole CasinglTubing Wt. Grade Connection Length Top Bottom
Size Size / / md 1 tvd md 1 tvd
8 Y:z" 7" 26.0# L-80 BTC-M 7,449' 3,325 I 3,240 10,774 I 8,814
61/8" 4 Y:z" 12.6# L-80 IBT-M 3,345' 10,624 I 8,692 13,969 I 8,894
Tubing 4 Y:z" 12.6# 13Cr-80 V AM TOP 10,624' Surface 10,624 I 8,692
Cementina Proaram
7",26#, L-80, BTC-M drilling liner
Lead slurry: 6,300' of 7" X 8 W' annulus with 40% excess, plus 150' of 9 5/8"
X 7"liner lap, plus 200' of 9 5/8" X 5" drill pipe annulus.
Tail slurry: 1 ,000' of 7" X 8 W' annulus with 40% excess, plus 85' of 7", 26#
shoe track.
Pre-Flush
Spacer
Lead Slurry
Tail Slurry
Casing String:
Slurry Design Basis:
Fluids Sequence 1 Volume:
None planned
45bbls MUdPUSH~t . ppg c;;,'
213.0bbl I 1,196cf .' x Class 'G', 15.8PP9;~Cf/Sk.
34.9bbl 1196 cf 1(16 sx Class 'G', 15.8ppg; ~cf/sk.
A-30A Sidetrack
Page 2
.
Casing String:
Slurry Design Basis:
Fluids Sequence 1 Volume:
.
41/2",12.6#, L-80, IBT-M solid production liner
Lead slurry: none planned
Tail slurry: 3, 19S' of 4 1/2" X 6 1/8" annulus with 30% excess, plus 8S' of 4
1/2", 12.6# shoe track, plus 1S0' of 7" X 4 W' liner lap, plus 200' of 7" X 4"
drill pipe annulus.
Pre-Flush 1Sbbls CW100
Spacer 2Sbbls MudPUSH at 9.6ppg
Lead Slurry None planned /1 '---',
Tail Slurry 78.4bbl /440 cf (36]/sx Class 'G', 1S.8ppg;(j.2Q"tf/sk.
¿;/ '---"'""'
CasinQ I Formation InteQritv TestinQ
Test Test Point Test Type Test pressure
9 S/8" casing to surface Bridge plug to surface 30 min recorded 3,SOOpsi surface /
Intermediate casing window 20' beyond middle of window FIT 12.Sppg EMW
9 S/8" casing / 7" liner Float equipment to surface 30 min recorded 3,SOOpsi surface
Intermediate liner shoe 20' new formation beyond shoe FIT 10.0ppg EMW
Well Control
Well control equipment consisting of S,OOOpsi working pressure pipe rams (2), blind/shear rams, and an
annular preventer will be installed and is capable of handling maximum potential surface pressures. The
ram configuration will be:
BOPE and drilling fluid system schematics are currently on file with the AOGCC.
Well Interval:
Maximum anticipated BHP:
Maximum surface pressure:
Calculated kick tolerance:
Planned BOPE test pressure:
BOPE configuration for 7"
drilling liner.
Well Interval:
Maximum anticipated BHP:
Maximum surface pressure:
Calculated kick tolerance:
Planned BOPE test pressure:
Planned completion fluid:
A-30A Sidetrack
8 W' intermediate drilling liner section
3,200psi at 8,SOO' sstvd.
2,3ft(fpsi (based upon BHP and a full column of gas from TD @ 0.10 pSi/ft)
!
I¢inite'with 12.Sppg EMW FIT; 1 OObbls with 11.8ppg EMW FIT.
~50psi low / 3,SOOpsi high - 14 day test period /
Variable Bore Rams will remain installed, rather than C/O to 7" pipe rams.
The rig will follow the current, best practice of picking up a jOint of drill
pipe, crossed over to casing thread, in the event of a kick. This
configuration provides two sets of employable rams, rather than one.
6 1/8" production liner section
3,SOOpsi at 8,800' sstvd.
~i (based upon BHP and a full column of gas from TD @ 0.10 psi/ft)
(1nfil]jt.E(with 10.0ppg EMW FIT.
25ópsi low / 3,SOOpsi high
8.4ppg seawater /7.1 ppg Diesel
Page 3
.
.
Disposal
Annular Injection:
Cuttings Handling:
Fluid Handling:
No annular injection in this well.
Cuttings generated from drilling operations are to be hauled to the Grind and Inject
station at DS-04. Any metal cuttings should be sent to the North Slope Borough.
All drilling and completion fluids and other Class II wastes are to be hauled to DS-04
for injection. All Class I wastes are to be hauled to Pad 3 for disposal.
GeoloQic ProQnosis
Formation MD TVDbkb TVDss Comments
SV1 3,890 3,595
UG4 4,615 4,120
UG4A 4,663 4,155
UG3 4,905 4,330
UG1 5,802 4,980
WS2 6,451 5,450
WS1 6,824 5,720
CM3 7,107 5,925
CM2 7,832 6,450
CM1 8,840 7,180
THRZ 9,325 7,545
BHRZ
LCU 9,568 7,745
TJG
TJF 9,751 7,895
TJE 9,836 7,965
TJD 10,323 8,365
TJC 10,414 8,440
TJB 10,591 8,585
TJA
TSGR 10,774 8,735
TSHU 10,791 8,750
TSHB
TSHC
TSAD 10,918 8,835 -3,500psi (7.6ppg EMW)
Landing Pt. 11 ,383 8,880
TD Criteria
I TD Criteria:
I Well plan TD at the given X, Y coordinate. Penetrate base Shublik.
Fault ProQnosis
Fault
Fault #1
Formation
Encountered
Z4B
MD Intersect
11,932
TVDss
Intersect
-8,842
Estimated
Throw
-10'
Direction of
Throw
DIU NNW
Uncertainty
+1- 110'
A-30A Sidetrack
Page 4
.
.
Operations Summary
Pre-Ria Operations:
1. R/U and pressure test the 4 1/2" tubing string, against the cemented coil tubing fish, to 3,000psi.
(Done 4/14/2004. Injection rate of 4.9bpm was established at 1,350psi).
2. If injection is evident, RIH and set a 4 W' cement retainer at -3,550'md.
3. RIH with coil tubing, sting into the retainer and perform a hesitation squeeze to -3,OOOpsi. Pull out of
retainer and circulate the tubing, above the cement retainer, clean. POOH.
4. Drift the 4 W' tubing to tag at -3,550' md to confirm clear for upcoming chemical cut.
5. Fluid-pack the 4 W' tubing and 9 5/8" x 4 W' annulus to surface. Test to 3,000 psi.
6. R/U E-line. RIH with the appropriate chemical cutter and cut the 4 W' tubing at -3,500' md.
7. Displace the well to clean seawater by circulating down the tubing through the tubing cut. Continue to
circulate until clean seawater returns to surface. Freeze protect to -2,200' MD with diesel.
8. Test the 9 5/8" pack-off and tubing hanger seals to 5,000psi for 30 minutes. Function all Lock Down
Screws, repair or replace as needed.
9. Bleed casing and annulus pressures to zero.
10. Set a BPV. Secure the well. Level the pad as necessary.
Ria Operations:
1. MI I RU Nabors 7ES.
2. Pull BPV. Circulate out diesel freeze protection and displace the well to ~awater. Install TWC. /
3. Nipple down the tree. Nipple up and test BOPE to 3,500psi. Pull TWC. /
4. R/U. Pull the 4W' tubing from the cut at -3,500' MD and above.
5. M/U 8 W' mills BHA and P/U 5" drill pipe. RIH and tag tubing stump. POOH. /
6. R/U SWS E-line. P/U and RIH with HES 9 5/8" EZSV. Set bridge plug at -3,500'. POOH.
7. Pressure-test the 9 5/8" casing to 3,500psi for 30 minutes. Record test.
8. P/U and RIH with 9 5/8" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as desired,
and set on bridge plug. Shear off of whip stock.
9. Displace the well to 9.3ppg LSND based milling fluid.
10. Mill window in 9 5/8" casing at ± 3,475' MD, plus approximately 20' beyond middle of window.
Circulate the well bore clean.
11. Pull up into 9 5/8" casing and conduct an FIT to 12.5ppg EMW. POOH.
12. M/U 8 W' Dir/GR/PWD assembly. RIH, kick off and drill the 8 1/2" intermediate section to the top of
the Sag River, per directional proposal. Circulate well clean, short trip to window. POOH. ,,/
13. Run and cement a 7", 26.0#, L-80 intermediate drilling liner.
14. M/U a 61/8" Dir/GR/Res/ABI drilling assembly. RIH to the landing collar.
15. Test the 9 5/8" casing X 7" liner to 3,500psi for 30 minutes. Record the test.
16. Drill out the 7" liner float equipment and cement to the shoe.
17. Displace the well to 8.5ppg Flo-Pro drilling fluid.
18. Drill out the 7" shoe plus -20' new formation, pull up into the shoe and conduct an FIT to 10.0ppg
EMW. Drill ahead to section TD per directional proposal. /. <
19. Circulate well bore clean, short trip to the 7" shoe. Circulate. POOH.
20. Run and cement a 4 W', 12.6#, L-80 solid production liner. POOH.
21. P/U and RIH with Schlumberger 2 W' tcp perforating guns. Perforate approximately 2,000' of Z4
interval, per subsurface team. POOH.
22. R/U and run a 4 1/2", 12.6#, 13Cr-80, VAM TOP completion, stinging into the 4 1/2" liner tie back
sleeve.
23. Set the packer and individually test the tubing and annulus to 3,500psi for 30 minutes. Record each
test.
24. Install a TWC.
25. Nipple down the BOPE. Nipple up the tree and test to 5,000psi. Pull TWC.
26. Freeze protect the well to -2,200'. Install BPV. Secure the well.
27. Rig down and move off.
.,-'"
/'
A-30A Sidetrack
Page 5
.
.
Post-Ria Operations:
1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer.
2. Install gas lift valves.
3. Install well house and instrumentation.
A-30A Sidetrack
Page 6
.
.
Phase 1: Move In I Ria Up I Test BOPE
Planned Phase Time
24 hours
Planned Phase Cost
$62,641
Reference RP
.:. "Drilling/Work-over Close Proximity Surface and Subsurface Wells Procedure" SOP
Issues and Potential Hazards
~ No wells will require shut-in for the rig move onto A-30. However, A-17 is 54.0' to the North, and
A-18 is 56.0' to the South. These are the closest neighboring wells. Care should be taken while
moving onto the well. Spotters should be employed at all times.
~ The A-30A well bore will be secured with 2 barriers, (the cement P&A plug and seawater). Prior to
pulling the tree, verify a static column of seawater to surface and that no pressure exists.
~ A-Pad .ffi-.designated as an H2S site. Standard Operating Procedures for HzS precautions should
be followed at all times. Recent HzS data from the pad is as follows:
Closest well to SHL Latest H2S reading Closest well to BHL
/'
A-17
A-18
N/A
40ppm
A-20
X-34
Latest H2S reading
20ppm
20ppm
The maximum level recorded of H2S on the pad was 200ppm, in 3/2000.
);.> Post Permit to Drill and Summary of Drilling Hazards in the dog house and camp prior to spud
/
Phase 2: De-complete Well
Planned Phase Time
28 hours
Planned Phase Cost
$106,861
Reference RP
.:. "De-completions" RP
Issues and Potential Hazards
~ The A-30 well bore will be secured with 2 barriers, (the cement P&A plug and the seawater). Prior
to pulling the tree, verify a static column of seawater to surface and that no pressure exists.
~ Monitor the well to ensure the fluid column is static, prior to pulling the completion.
~ Have all wellhead and completion equipment NORM-tested, following retrieval.
~ Note that this wellhead is a McEvoy SSH. The tubing hanger is a 12" X 41/2" McEvoy (5)
Seal hanger, with Buttress lifting thread. Once the stack has been nippled down, verify the
hanger type in preparation for de-completion.
~ There is a 4W' Otis SSSV nipple with a dual "X" control lines.
A-30A Sidetrack
Page 7
.
.
Phase 3: Run Whip Stock
Planned Phase Time
27 hours
Planned Phase Cost
$179,491
Reference RP
.:. "Whip stock Sidetracks" RP
Issues and Potential Hazards
~ A 95/8" whip stock will be run and set in the existing intermediate casing.
~ There will be no cement behind the 9 5/8" casing at the sidetrack point.
~ Once milling is complete, make sure all BOP equipment is operable. Follow standard rig
procedure in thoroughly cleaning all areas in which metal cuttings may have settled.
Phase 5: Drill 8%" Intermediate Hole Interval
Planned Phase Time
267 hours
Planned Phase Cost
$1,126,793
Reference RP
.:. "Shale Drilling, Kingak and HRZ" RP
.:. "Prudhoe Bay Directional Guidelines"
.:. "Lubricants for Torque and Drag Management" RP
Issues and Potential Hazards
~ This well bore will exit the original well in the lower SV sands, and drill the Colville, the Kingak, to
the top of the Sag River formation. Previous A-pad wells drilled the Kingak with 9.8 to 10.1 ppg
mud weights. For this well, the HRZ will require a mud weight of at least 10.8ppg and the Kingak
will require -11.0ppg. Maintain mud weight at 11.0ppg, minimally, from above the Kingak to
7" liner point. Follow all shale drilling practices to minimize potential problems.
~ KICK TOLERANCE: In the worst-case scenario of 8.6ppg pore pressure at the Sag River depth,
a fracture gradient of 11.8ppg at the 9 5/8" casing window, and 11 .Oppg mud in the hole, the kick
tolerance is 96bbls.
A-30A Sidetrack
Page 8
.
.
Phase 6: Run and Cement 7" Intermediate Liner
Planned Phase Time
36 hours
Planned Phase Cost
$324,503
Reference RP
.:. "Intermediate Casing Cementing Guidelines" RP
.:. "Running and Cementing a Drilling Liner" RP
.:. "Shale Drilling, Kingak and HRZ" RP
Issues and Potential Hazards
~ Swab and surge pressure should be minimized with controlled liner running speeds and by
breaking circulation slowly. Excessive swab / surge pressures could initiate Kingak instability
problems.
~ Ensure the liner top packer is set prior to POOH. Slack off with rotation to the maximum allowable
down weight, as per Baker representative.
Phase 7: Drill 6 1/8" Production Hole Interval
Planned Phase Time
150 hours
Planned Phase Cost
$853,078
Reference RP
.:. "Standard Operating Procedure: Leak-off and Formation Integrity Tests"
.:. "Prudhoe Bay Directional Guidelines" RP
Issues and Potential Hazards
~ The existing A-30L 1 (CTD) lateral lies in "close" proximity to the planned A-30A sidetrack while
drilling the production interval, from the 7" shoe to approximately 11,960' md. The separation
ranges from 230' to 330' within the interval. Once beyond -11,960', the drilling well will extend
beyond TD of the L 1 lateral. This L 1 lateral is plugged with a coil tubing fish and cement to -3,600'
md.
~ The only lost circulation event in the near surrounding wells occurred during the drilling of the L 1
lateral. The losses occurred in Zone 4B. Initially, all returns were lost, but were eventually
controlled with cement. This A-30A sidetrack was planned with adequate standoff from the A-
30L 1 lost circulation area.
).> The horizontal section of the planned A-30A well should cross one fault at approximately 11,900'
md (+/- 100'), according to the directional proposal. This fault is of small throw, -10', and is not
thought to be a major concern. However, due awareness and preparation will be prudent.
A-30A Sidetrack
Page 9
.
.
Phase 9: Run 4%" Production Liner
Planned Phase Time
30 hours
Planned Phase Cost
$234,952
Reference RP
.:. "Modified Conventional Liner Cementing" RP
Issues and Potential Hazards
~ The completion design is to run a 4 W', 12.6#, L-80 solid liner throughout the production interval.
~ Differential sticking is possible. The 8.6ppg Flo-Pro will be -600psi over balanced to the Ivishak
Zone 4 formation. Minimize the time the pipe is left stationary while running the liner.
~ Ensure the liner top packer is set prior to POOH.
~ Sufficient 4 W' liner will be run to extend -150' back up into the 7" liner.
Phase 10: DPC Perforate
Planned Phase Time
36 hours
Planned Phase Cost
$535,236
Reference RP
.:. "Drill Pipe Conveyed Perforating" RP
Issues and Potential Hazards
~ The well will be DPC perforated, -600psi overbalanced, after running the 4 W' liner. Ensure all
personnel are well briefed on Schlumberger's perforating procedures and that all responsibilities
are understood. Only essential personnel should be present on the rig floor while making up DPC
guns.
~ Expect to lose fluid to the formation after perforating. Have ample seawater on location and be
prepared with LCM if necessary.
A-30A Sidetrack
Page 10
.
.
Phase 12: Run 4 %" 13Cr-80 Completion
Planned Phase Time
30 hours
Planned Phase Cost
$473,887
Reference RP
.:. "Completion Design and Running" RP
.:. "Handling and Running 13 Chrome" RP
.:. "Tubing connections" RP
Issues and Potential Hazards
~ Diesel will be used to freeze protect the well. The diesel flash point is 1000 F. Diesel vapor
pressure is - 0.1 psia at 1000 F.
~ The completion, as designed, will be to run a 4W', 12.6#, 13Cr-80, VAM TOP production tubing
string, stinging into the 4 W' liner tieback sleeve.
Phase 13: ND/NU/Release Ri~
Planned Phase Time
15 hours
Planned Phase Cost
$50,651
Reference RP
.:. "Freeze Protecting an Inner Annulus" RP
Issues and Potential Hazards
~ There are two close proximity surface issues, A-17 to the North, and A-18 to the South. Identify all
potential hazards in a pre rig move meeting, and take every precaution to ensure good
communication prior to beginning the rig move. Use spotters when moving the rig away from the
well and about the pad.
$ ~ '1 4~ M ~
A-30A Sidetrack
Page 11
A-30A Kick Tolerance .xls
.
Page 1 of 2
e
5/6/2004 7: 18 AM
KICK TOLERANCE CALCULATOR
For Vertical, Deviated or Horizontal Wells
Well:
Version 6.0, December 2000
Units (UK/US):
Kick Zone Parameters:
1 Open hole Size? (inch)
2 Measured Depth? (ft)
3 Vertical Depth? (ft)
4 Horizontal Length (>87 deg) ? (ft)
5 Tangent Angle Above Horizontal? (deg)
6 Min Pore Pressure Gradient? (ppg)
7 Max Pore Pressure Gradient? (ppg)
8 Kick Zone Temperature? (deg.F)
Weak Point Parameters:
9 Measured Depth? (ft)
10 Vertical Depth? (ft)
11 Section Angle «87 deg) ? (deg)
12 Min Fracture Gradient / EMW ? (ppg)
13 Max Fracture Gradient / EMW (ppg)
14 Weak Point Temperature? (deg.F)
Other Parameters:
15 Drill Collar OD ? (inch)
16 Drill Collar Length? (ft)
17 Drillpipe OD ? (inch)
18 Surface Pressure Safety Factor? (psi)
19 Mud Weight in Hole? (ppg)
Annular Capacity Around BHA: (bbl/ft)
Annular Capacity Around DP: (bbl/ft)
At Min Fracture Gradient:
Circulating MAASP (psi)
Gas Gradient at Weak Point (psi/ft)
For Min Pore Pressure:
Max Allowable Gas Height: (ft)
Kick Tolerance: (bbl)
For Max Pore Pressure:
Max Allowable Gas Height: (ft)
Kick Tolerance: (bbl)
At Max Fracture Gradient:
Circulating MAASP (psi)
Gas Gradient at Weak Point (psi/ft)
For Min Pore Pressure:
Max Allowable Gas Height: (ft)
Kick Tolerance: (bbl)
For Max Pore Pressure:
Max Allowable Gas Height: (ft)
Kick Tolerance: (bbl)
Input Error Messages:
10774
8814
Non-Horizontal
3475
11.000
0.02592
0.04589
Comments:
40
0.0513
3069
149.8 -
ð-1
6.3/
J
249
0.0567
3509
189.5
26~
117.0/
,-,;/
A-30A Kick Tolerance .xls .
200
180
160
..-
:õ 140
.c
--
Q) 120
(,)
c
~ 100
Q)
Õ 80
I-
~
(,) 60
S2
40
20
0
7.40
APPENDIX:
Page 2 of 2
.
5/6/2004 7:18 AM
-tr-Min Fracture Grad -o-Max Fracture Grad
t--
t
I
"0
,"-
I
7.60
7.80
8.00
Pore Pressure Gradient
8.20
8.40
8.80
8.60
Maximum Allowable Gas Influx Volume
Based on Casing Burst & Suñace Equipment Rating
Max Allowable Surface Pressure? (psi)
Near Surface Casing ID ? (inch)
Near Surface Annular Temperature? (deg.F)
Gas Gradient at Max Surface Pres: (psi/ft)
Near Surface Annular Capacity: (bbl/ft)
At Minimum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (ft)
Max Allowable Gas Vol. on Shut-in: (bbl)
At Maximum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (ft)
Max Allowable Gas Vol. on Shut-in: (bbl)
1850
..-
:õ
e.. 1800
Q)
§ 1750
Õ
> 1700
III
Æ 1650
Q)
:õ 1600
I'CI
==
.2 1550
<C
>< 1500
I'CI
:æ 1450
7.40
-0.
7.60
7.80
8.00 8.20
Pore Pressure Gradient
0.113
0.06675
Comments:
14077 Extends to hole TD
infinite
13079 Extends to hole TD
infinite
8.40
8.60
8.80
A-30A ~oposed Com~tion /
l J - I 2,200' Ii 41 12" " ~"".g ";0010, Ð = 3,813"1
DA TE REV BY COMMENTS DATE REV BY
06/29/85 ORIGINAL COM PLETION
06/19/03 JMlTLH GLV C/O
06/21/03 3McN/TLI- MILL NIPPLE/SET IBP & WS
07/02/03 DAV/KK CTD RIG SIDETRACK (A-30L 1)
03/04/04 dew A"oposed Completion Wp04 I
113-3/8" CSG, 72#, L-/1
80, ID = 12.347"
2,677' I
9 5/8" X 7" Baker Flex Lock -
liner hanger, ZXP packer wI
TBS.
3,300'
19 5/8" Whip stock setl1
on EZSV bridge plug.
3,500'
CHEM CUT 2-3/8" CT (8.MD) H
TOPOF CEMENT (8.MD) H
3600'
3765'
I TOP OF 7" LNR H 10497'
14-112" TBG, 12.6#, L-11 10560'
80, ID = 3.958"
19-5/8" CSG, 47#, L- 11 10752' I
80, ID = 8.681"
10785' -t BKR WHIPSTOCK
10795' -t RA TAG
10847' HBKR IBPWI STANDING VLV I
I PBTD H 11197'
17" LNR, 26#, L-80, 11
.0383 bpf, ID = 6.276" 11240'
TREE = 4 1/8" CIVV
W8.LHEAD= McEVOY
AcTuATOR;;:: AX8.S0N
KB. 8.EV = 79.00'
BF. 8.EV = 52.92'
KOP = 2,200'
Max "Angie =96°@ 13:435'
Datum MÓ= 10,913'
Datum TVD= 8,840' SS
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VALVE
6 3340 3250 32.0" 4 1/2" X 1" KBG-2 DV
5 4200 390043.5" 4 1/2" X 1" KBG-2 DCK
4 6070 525043.5" 4 1/2" X 1" KBG-2 DV
3 7790 650043.5" 4 1/2" X 1" KBG-2 DV
2 9170 750039.0" 4 1/2" X 1" KBG-2 DV
1 10390 8500 34.5"41/2"X1"KBG-2 DV
LATa-
BK
BK
BK
BK
BK
BK
10550' 1-1 41/2" - 'X' landing nipple
10,570' l-t 4 1/2" X 7" Baker S-3 Pkr
10,590' l-t 41/2" - 'X' landing nipple
10,610' 1-1 41/2" - 'XN' landing nipple I
-I 10,620' H 41/2",12.6#, 13Cr-80, VAMTOP I
10,625'
5" X 7" Baker HMC liner
hanger, ZXP liner top packer
w I Tie Back Sleeve.
10,774' l-t 7", 26.0#, L-80, BTG-M liner I
.
/
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
13,969' l-t 4 1/2",12.6#, L-80 solid liner
I 10928' l-t STUCK CEMENT NOZZLE I
-
COMMENTS
PRUDHOE BAY UNrr
W8.L: A-30A
PERMrr No:
API No: 50-029-21372-01
SEC 35, T11N, R 13E
BP Exploration (Alaska)
TREE =
, WELLHEAD=
ACTIJA TOR=
"¥ . ..-..,.."
KB. ELEV =
BF. ELEV =
KOP=
~"..",,","... ..<...... , ,
Max Angle =
Datum MD =
Datum TVD=
4"CrN
McEVOY
AXELSON
80.88'
52.92'
2200'
47 @ 6800'
10833'
8800' SS
~OL 1 Pre Rig
eErY NOTES: WARNING: RADIO TRANSMITTER IN
THER MONITORING SHACK MUST BE TIJRNED OFF
BEFORE ANY WELL WORK INVOLVING EXPLOSIVES
CAN BEGIN. CONTACT PAD OPERATOR.
113-3/8" CSG, 72#, L-11 2 67T
80, ID = 12.347" ,
I Pre rig Chern cut 4 1/2" tbg. H
3,500'
3,550'
3600'
3765'
Pre rig Cerrent retainer; P&A. 1-1
r CHEM CUT 2-3/8" CT (ELMD) H
I TOP OF CEMENT (ELMD) H
I TOP OF 7" LNR H 10497'
14-1/2" TBG, 12.6#, L-11 10560'
80, ID = 3.958"
19-5/8" CSG, 47#, L- 1110752' I
80, ID = 8.681"
10785' 1-1 BKR WHIPSTOCK 1
10795' -1 RA TAG
10847' I-lBKRIBPW/STANDINGVLV I
I PBTD H 11197'
\7" LNR, 26#, L-80, 11 1
.0383 bpf, ID = 6.276" 1 240'
-
.-1
-=~::::
:=:=~=-
,..... ,.....
8I/~
-
DATE REV BY COMMENTS DATE REV BY
06/29/85 ORIGINAL COMPLETION
06/19/03 JtvVTLH GLV C/O
06/21/03 3McN/TU- MILL NIPPLE/SET IBP & WS
07/02/03 DAV/KK ATTEMPTED RIG SIDETRACK (A-30L 1)
04/19/04 dew Proposed Pre rig condition I
2104' 1-l4-1/2" OTIS SSSV NIP, ID = 3.813" 1
~ I Zl \D4-
Minimum ID = 1.995" @ 3600'
2-3/8" CT, 4.45#, HS-90
GAS LIFT MANDRELS
ST MD TVD DEV TYÆ VLV LATC/- PORT
6 3774 3518 44 OTIS DMY RA 0
5 6366 5418 46 OTIS DMY RA 0
4 8219 6722 43 OTIS DMY RA 0
3 9366 7611 36 OTIS DMY RA 0
2 10102 8209 36 OTIS DMY RA 0
1 10253 8381 36 OTIS DMY RA 0
DATE
06/17/03
06/17/03
06/17103
06/17/03
I 10358' H4-1/2' OTIS XA SLIDING SLEEVE, ID = 3.813" 1
10419' 1--1 BOT SBR SEAL ASSY W/OTIS X NIP, ID = 3.813"
10443' H9-S/8" x 4-112" BOT PKR, ID = 3.958" 1
10485' H4-1/2" OTIS X NIP, ID = 3.813" 1
10516' H4-1/2" OTIS XN NIP, MILLED ID = 3.80"
I 10547' H ELMD TT LOGGED 07/31/99
1 10560' H4-1/2" BOT-SOS TBG TAIL 1
MIL LOUT WINDOW 10790' - 10796' I
10928' H STIJCK CEMENT NOZZLE 1
PERFORATION SUMMARY
REF LOG: SWS-BHCS ON 06/23/85
ANGLE AT TOP PERF: 36 @ 10763'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DATE
3-3/8" 3 10763 - 10774 0 01/22/91
3-3/8" 3 10877 - 10896 0 12/20/90
3-3/8" 3 10900 - 10906 0 12/20/90
3-3/8" 12 10914 - 10924 0 01/18/90
3-3/8" 3 10932 - 10962 0 12/20/90
3-1/8" 4 10974 -11038 S 08/11/90
3-3/8" 4 11043 - 11048 S 08111/90
I 11900' H
TO
COMMENTS
PRUDHOE BA Y UNIT
WELL: A-30L 1
PERMIT No: 2031070
API No: 50-029-21372-60
SEC35, T11N, R 13E
BP Exploration (Alaska)
· POST THIS NOTICE IN THE DOGHOU'
A-30A Rig site
Summary of Drilling Hazards
./ Standard Operating Procedures for H2S precautions should be followed at
all times. The highest concentration currently on record is 200 ppm, measured
in March 2000.
./ NORM test all retrieved well head and completion equipment.
./ Two wells, A-20 and X-06, fail to pass major risk criteria. These wells encroach
the area of allowable separation within the reservoir. A-20 is currently shut-in
awaiting RWO. X-06 is an injector, which may be shut in as needed.
./ The closest neighboring wells, at surface, are A-17 and A-18. Well A-17 is
approximately 54' to the North. Well A-18 is approximately 56' to the South. No
shut-in should be required, but care should be taken during rig MIRU and RDMO.
Use spotters as necessary.
./ Due to sidetracking into the SV sands and drilling the West Sak, Colville, HRZ
and Kingak shale, mud weight will be increased from 9.3ppg to 11.0ppg, and
maintained at 11.0ppg through the HRZ, and the Kingak, to section TD. Monitor
ECD closely.
./ There is one known fault crossing expected, during the drilling of the production
interval of A-30A. No significant losses are expected, but due attention should be
paid to the possibility.
./ The only fault related losses, in the surrounding area, during the drilling of the A-
30L 1 CTD well bore. The planned well trajectory of A-30A has been designed
with sufficient standoff from the area of this event, but again, due diligence is
warranted. The lost circulation decision tree should be followed if lost fluid returns
are encountered.
./ Differential sticking may be encountered. Overbalance is approximately 600 psi.
Always follow established drilling and connection practices for stuck pipe
prevention.
./ Diesel will be used to freeze protect the well. The diesel flash point is 100° F.
Diesel vapor pressure is - 0.1 psia at 100° F.
CONSULT THE A-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL
INFORMATION.
A-30A
COMPANY DETA!LS
REFEìŒNCE INFORMA T!ON
BP Amo<.:o
CASING DETAILS
No. TVD MD Name Size
8814.00 10773.71 7" 7.000
8894.00 13968.48 4112" 4.500
FORMATION TOP DETAILS
SURV¡;Y PROGRMd
Depth Fm Depth To Surwy''Phn
Cn~a¡ëd By: Troy Jakabosky
Phm: A-30A wp04 (A<10/P]¡m A-30A)
Dale
Too!
3475.00 13963.49 P!mmeJ: /\-30/\ wp(}4 V20
M\VD
Owe-ked'
Rcviewed'
WELL DETAILS
Name
Northin!!
L¡tj¡udC'
Lungitw..k S!01
¡\-}ü J j L\!6 I)J !.57 5\J47265.oo 654}\J}LÜO 70"!5'46.!76N !4S045'06.24ß\V
No. TVDPath MDPath Fonnation
Northing
SECTION DETAILS
9568.12 LCU
TJF See MD Ine AZl TVD +N/-S +Eí-W DLeg TFace
TJE
TJD 3475.00 34.99 144.96 -471.71 263.21 0.00 0.00
TJC 12.00 40.00
TJB 3 5.00 39.66
TSGR 4 0.00 0.00
TSHU 5 4.00 -147.44
TSAD 6 0.00 0.00
7 0.00 0.00
8 64.00 20.00 0.00
9 89.02 20.00
10 89.02 0.00
II 90.00 8.00
12 138.68 -5252.94 8.00 -0.06
13 138.68 -5543.59 0.00 0.00
14 120.00 8909.00 6.00 -93.04
15 100.20 890 1.44 6.00 -99.53
16 100.20 890L58 0.00 0.00
17 99.00 8904.00 6,00 -161.48
18 96,]3 8906.96 6.00 -106.33
]9 96.73 8954.48 0.00 0.00
20 8959,00 4.00 1.97
2] 8950.69 4.00 0.00
22 96,93 8894.00 -6036.48 5]09.67 0.00 0.00
]
2
3 4663.40 UG4A
4
5
6
7 5799.00
8 6004.00
9 6529.00
10 7259.00
I]
12
13
]4
15
]6
17
18
19
20
Dir : 3662.5 J' MD, 3509.04' TVD
E
2
.""
""
'"
15.
c'3
~
"
>
"
"
þ
TARGET DETAILS
Nmne
h¡gtm.g Shape
Start [)ir4/!OO': 9051.91' MD. 7412.66TVD
End Dir : 9324.57' MD. 7624' TVD
10793.19' MD. 8830'TVD
End Dir : J 1067.52' MD. 8953.72'TVD
Stir' Dir 8/100': 11370.06' MD, 8958,89'TVD
: 11435.72' MD. 8957,08' TVD
13968.49' MD, 8894' TVD
¡ 1 I I 1 I 1
, I '
9600
Vertica] Section at ]39,75' [1200ft/in]
Dale"
VSec Target
530,09
A-30A 1'1.5
A-30A T2
A-30A T3
A-30A T4
A-30A 1'5
A-30A 1'6
I 1 I I I I !
Plan: A·30A wp04 (A-30iPLm A-30M
Trov Jakabr Date:
By:
Fm Depth Tn T(
.1475.00 ¡ PJmmi:d: /\-30/\ wp04 \'''''
4
Name ·\V N" Lati SI01
'\-30 i!J5.!6 9[1.57 J472{iS.OO 65439~ 70°1 5'46.1 76N ,5'06.24:-\\1/
TARGET!
Nam¡; TVD NOrîhìng
SECTION DETAILS
See MD c /\zì TVD +N/-S +E/-W DLeg TF ace VSec Target
I 3475.00 34.99 44.96 A7I 0.00 0.00 530.09
2 3495.00 36.86 47.53 12.00 40.00 541.75
3 5.00 39.66
4 .91 0.00 0.00
5 9324.57 4.00 -147.44 4396.15
6 0.00 0.00 5219.66
7 0.00 0.00
8 20.00 0.00 A-30A T1.5
9 -13.77
10 89.02 39.08 0.00
11 90.00 8.00 A-30A 12
12 8.00
13 -5543 3076.04 0.00
14 93.00 8909.00 -5739 3315.25 6.00 6522.79 A-30A T3
15 ·5854 6.00
16 ·5857 0.00
17 99.00 -5867 6.00 -161.48 A-30A T4
18 12590.05 96.73 6.00 -106.33
19 0.00 0.00
20 -5958 4.00 1.97 A-30A T5
21 13448.]4 8950.69 4.00 0.00
22 13968.49 8894.00 0.00 0.00 A-30A T6
FORMATION TOP DETAILS
CASING DETAILS
No. TVD MD Name Size
7" 7.000
4 ]/2' 4.500
Fonnation
SVI
UG4
UG4A
UG3
HRZ
LCU
TJF
TSAD
MDPath
7107.09
CM3
3890.25
3674.00
4409.00
No. TVDPath
8914.00
1
2
3
4
5
6
7
R
9
10
11
12
13
14
15
16
17
18
19
20
6000
OOOft/in]
W est( -)/East(
COMPANY DETAIL";
BP Amœn
2000
000
-I
2
c
g
:f;
t:
o
~
'5
o
(f)
· Sperry-Sun - Draft Cop'
Sperry-Sun
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Prudhoe Bay
PB A Pad
A-30
Plan A-30A
Date: 3/23/2004 Time: 10:41 :48 Page:
Co-ordinate(NE) Reference: Well: A-30, True North
Vertical (TVD) Reference: 79' AS Per Dave W 79.0
Section (VS) Reference: User (0.00N,O.00E,139.75Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Plan: A-30A wp04
Date Composed:
Version:
Tied-to:
Principal: Yes
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: PB A Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5946131.57 ft
653509.42 ft
Latitude: 70 15
Longitude: 148 45
North Reference:
Grid Convergence:
A-30
A-30
Well Position:
Well:
Slot Name:
+N/-S 1115.16 ft
+E/-W 911.57 ft
Position Uncertainty: 0.00 ft
5947265.00 ft
654398.00 ft
Northing:
Easting :
Latitude:
Longitude:
Wellpath: Plan A-30A
500292137200
Current Datum: 79' AS Per Dave W
Magnetic Data: 4/17/2000
Field Strength: 57345 nT
Vertical Section: Depth From (TVD)
ft
28.42
Height 79.00 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
+N/-S
ft
0.00
Casing Points
1/15/2004
20
From: Definitive Path
Alaska, Zone 4
Well Centre
bggm2003
35.209 N
32.775 W
True
1 .17 deg
70 15 46.176 N
148 45 6.248 W
A-30
3475.00 ft
Mean Sea Level
27.08 deg
80.68 deg
Directio n
deg
139.75
MD TVD Diameter Hole Size Name
ft ft in in
10773.71 8814.00 7.000 8.500 7"
13968.48 8894.00 4.500 6.125 41/2"
Formations
MD TVD Formations Lithology Dip Angle Dip Direction
ft ft deg deg
3890.25 3674.00 SV1 0.00 0.00
4615.08 4199.00 UG4 0.00 0.00
4663.40 4234.00 UG4A 0.00 0.00
4905.01 4409.00 UG3 0.00 0.00
5802.41 5059.00 UG1 0.00 0.00
6451.30 5529.00 WS2 0.00 0.00
6824.06 5799.00 WS1 0.00 0.00
7107.09 6004.00 CM3 0.00 0.00
7831.91 6529.00 CM2 0.00 0.00
8839.76 7259.00 CM1 0.00 0.00
9324.57 7624.00 HRZ 0.00 0.00
9568.12 7824.00 LCU 0.00 0.00
9750.79 7974.00 TJF 0.00 0.00
9836.03 8044.00 TJE 0.00 0.00
10323.14 8444.00 TJD 0.00 0.00
10414.47 8519.00 TJC 0.00 0.00
10591.05 8664.00 TJB 0.00 0.00
10773.71 8814.00 TSGR 0.00 0.00
10791.98 8829.00 TSHU 0.00 0.00
10917.99 8914.00 TSAD 0.00 0.00
· Sperry-Sun - Draft Cop'
Sperry-Sun
Company:
Field:
Site:
Well:
WeIlpath:
Targets
BP Amoco
Prudhoe Bay
PB A Pad
A-30
Plan A-30A
Date: 3/23/2004 Time: 10:41 :48 Page: 2
Co-ordinate(NE) Reference: Well: A-30, True North
Vertical (TVD) Reference: 79' AS Per Dave W 79.0
Section (VS) Reference: User (0.00N,O.00E,139.75Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Map Map <-- Latitude --> <- Longitude ->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec
Dip. Dir. ft ft ft ft ft
A-30A T6 8894.00 -6036.48 5109.67 5941335.00 659630.00 70 14 46.791 N 148 42 37.674 W
A-30A T 4 8904.00 -5867.69 3707.74 5941475.00 658225.00 70 14 48.459 N 148 43 18.435 W
A-30A T3 8909.00 -5739.60 3315.25 5941595.00 657830.00 70 14 49.720 N 148 43 29.846 W
A-30A Poly 8914.00 -4526.52 2449.88 5942790.00 656940.00 70 15 1.654 N 148 43 54.998 W
-Polygon 1 8914.00 -4526.52 2449.88 5942790.00 656940.00 70 15 1.654 N 148 43 54.998 W
-Polygon 2 8914.00 -5582.57 3218.45 5941750.00 657730.00 70 1451.265 N 148 43 32.659 W
-Polygon 3 8914.00 -5752.03 3677.10 5941590.00 658192.00 70 14 49.596 N 148 43 19.324 W
-Polygon 4 8914.00 -5958.44 5206.30 5941415.00 659725.00 70 14 47.557 N 148 42 34.862 W
-Polygon 5 8914.00 -6202.79 5171.28 5941170.00 659695.00 70 1445.155N 148 42 35.886 W
-Polygon 6 8914.00 -5986.24 3635.29 5941355.00 658155.00 70 14 47.293 N 148 43 20.544 W
-Polygon 7 8914.00 -5724.64 3073.49 5941605.00 657588.00 70 14 49.868 N 148 43 36.876 W
-Polygon 8 8914.00 -4675.96 2176.74 5942635.00 656670.00 70 15 0.185 N 148 44 2.943 W
A-30A Fault 1 8921.00 -5781.70 3075.32 5941548.00 657591.00 70 14 49.307 N 148 43 36.823 W
-Polygon 1 8921.00 -5781.70 3075.32 5941548.00 657591.00 70 14 49.307 N 148 43 36.823 W
-Polygon 2 8921.00 -5384.55 3268.52 5941949.00 657776.00 70 14 53.212 N 148 4331.201 W
A-30A T1.5 8924.00 -4877.70 2502.70 5942440.00 657000.00 70 14 58.200 N 148 43 53.465 W
A-30A T2 8959.00 -5213.60 2785.89 5942110.00 657290.00 70 14 54.896 N 148 43 45.233 W
A-30A T5 8959.00 -5958.26 4466.10 5941400.00 658985.00 70 14 47.564 N 148 42 56.386 W
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg
3475.00 34.99 144.96 3364.94 -471.71 263.21 0.00 0.00 0.00 0.00
3495.00 36.86 147.53 3381.14 -481.47 269.72 12.00 9.33 12.86 40.00
3662.51 43.59 155.28 3509.04 -576.48 320.93 5.00 4.02 4.63 39.66
9051.91 43.59 155.28 7412.66 -3951.77 1874.89 0.00 0.00 0.00 0.00
9324.57 34.80 145.00 7624.00 -4101.33 1959.08 4.00 -3.22 -3.77 -147.44
10773.71 34.80 145.00 8814.00 -4778.76 2433.42 0.00 0.00 0.00 0.00
10793.19 34.80 145.00 8830.00 -4787.87 2439.79 0.00 0.00 0.00 0.00
10939.21 64.00 145.00 8924.00 -4877.70 2502.70 20.00 20.00 0.00 0.00 A-30A T1.5
11067.52 89.02 139.08 8953.72 -4975.04 2579.06 20.00 19.50 -4.61 -13.77
11370.06 89.02 139.08 8958.89 -5203.63 2777.18 0.00 0.00 0.00 0.00
11383.30 90.00 138.68 8959.00 -5213.60 2785.89 8.00 7.39 -3.05 -22.44 A-30A T2
11435.72 94.19 138.68 8957.08 -5252.94 2820.47 8.00 8.00 -0.01 -0.06
11823.79 94.19 138.68 8928.70 -5543.59 3076.04 0.00 0.00 0.00 0.00
12135.06 93.00 120.00 8909.00 -5739.60 3315.25 6.00 -0.38 -6.00 -93.04 A-30A T3
12469.93 89.56 100.20 8901.44 -5854.02 3628.05 6.00 -1.03 -5.91 -99.53
12488.20 89.56 100.20 8901.58 -5857.25 3646.04 0.00 0.00 0.00 0.00
12550.84 86.00 99.00 8904.00 -5867.69 3707.74 6.00 -5.69 -1.91 -161.48 A-30A T 4
12590.05 85.34 96.73 8906.96 -5873.04 3746.47 6.00 -1.68 -5.78 -106.33
13175.23 85.34 96.73 8954.48 -5941 .44 4325.69 0.00 0.00 0.00 0.00
13316.77 91.00 96.93 8959.00 -5958.26 4466.10 4.00 4.00 0.14 1.97 A-30A T5
13448.14 96.25 96.93 8950.69 -5974.08 4596.20 4.00 4.00 0.00 0.00
13968.49 96.25 96.93 8894.00 -6036.48 5109.67 0.00 0.00 0.00 0.00 A-30A T6
· Sperry-Sun - Draft COP'
Sperry-SUD
Company: BP Amoco Date: 3/23/2004 Time: 10:41:48 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: A-30, True North
Site: PB A Pad Vertical (TVD) Reference: 79' AS Per Dave W 79.0
Well: A-30 Section (VS) Reference: User (O.OON,O.OOE, 139.75Azi)
Wellpath: Plan A-30A Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD IncI Azim TVD Sys TVD MapN MapE VS DLS TFO Tool Comment
ft deg deg ft ft ft ft ft deg/100ft deg
3475.00 34.99 144.96 3364.94 3285.94 5946798.82 654670.80 530.09 0.00 0.00 MWD
3495.00 36.86 147.53 3381.14 3302.14 5946789.20 654677.52 541.75 12.00 40.00 MWD
3500.00 37.05 147.79 3385.13 3306.13 5946786.69 654679.18 544.73 5.00 39.66 MWD
3600.00 41.02 152.64 3462.81 3383.81 5946732.68 654711.45 606.59 5.00 39.45 MWD
3662.51 43.59 155.28 3509.04 3430.04 5946695.27 654730.66 647.36 5.00 35.68 MWD
3700.00 43.59 155.28 3536.20 3457.20 5946672.01 654741.95 672.26 0.00 0.00 MWD
3800.00 43.59 155.28 3608.63 3529.63 5946610.00 654772.06 738.69 0.00 0.00 MWD
3890.25 43.59 155.28 3674.00 3595.00 5946554.02 654799.23 798.65 0.00 0.00 SV1 SV1
3900.00 43.59 155.28 3681.06 3602.06 5946547.98 654802.17 805.12 0.00 0.00 MWD
4000.00 43.59 155.28 3753.49 3674.49 5946485.96 654832.28 871.55 0.00 0.00 MWD
4100.00 43.59 155.28 3825.92 3746.92 5946423.94 654862.39 937.99 0.00 0.00 MWD
4200.00 43.59 155.28 3898.35 3819.35 5946361.92 654892.50 1004.42 0.00 0.00 MWD
4300.00 43.59 155.28 3970.79 3891.79 5946299.90 654922.61 1070.85 0.00 0.00 MWD
4400.00 43.59 155.28 4043.22 3964.22 5946237.88 654952.72 1137.28 0.00 0.00 MWD
4500.00 43.59 155.28 4115.65 4036.65 5946175.86 654982.83 1203.71 0.00 0.00 MWD
4600.00 43.59 155.28 4188.08 4109.08 5946113.84 655012.94 1270.14 0.00 0.00 MWD
4615.08 43.59 155.28 4199.00 4120.00 5946104.49 655017.48 1280.16 0.00 0.00 UG4 UG4
4663.40 43.59 155.28 4234.00 4155.00 5946074.52 655032.03 1312.26 0.00 0.00 UG4A UG4A
4700.00 43.59 155.28 4260.51 4181.51 5946051.82 655043.05 1336.57 0.00 0.00 MWD
4800.00 43.59 155.28 4332.94 4253.94 5945989.80 655073.16 1403.00 0.00 0.00 MWD
4900.00 43.59 155.28 4405.37 4326.37 5945927.78 655103.26 1469.43 0.00 0.00 MWD
4905.01 43.59 155.28 4409.00 4330.00 5945924.68 655104.77 1472.76 0.00 0.00 UG3 UG3
5000.00 43.59 155.28 4477.81 4398.81 5945865.76 655133.37 1535.87 0.00 0.00 MWD
5100.00 43.59 155.28 4550.24 4471.24 5945803.74 655163.48 1602.30 0.00 0.00 MWD
5200.00 43.59 155.28 4622.67 4543.67 5945741.72 655193.59 1668.73 0.00 0.00 MWD
5300.00 43.59 155.28 4695.10 4616.10 5945679.70 655223.70 1735.16 0.00 0.00 MWD
5400.00 43.59 155.28 4767.53 4688.53 5945617.69 655253.81 1801.59 0.00 0.00 MWD
5500.00 43.59 155.28 4839.96 4760.96 5945555.67 655283.92 1868.02 0.00 0.00 MWD
5600.00 43.59 155.28 4912.39 4833.39 5945493.65 655314.03 1934.45 0.00 0.00 MWD
5700.00 43.59 155.28 4984.83 4905.83 5945431.63 655344.14 2000.88 0.00 0.00 MWD
5800.00 43.59 155.28 5057.26 4978.26 5945369.61 655374.25 2067.32 0.00 0.00 MWD
5802.41 43.59 155.28 5059.00 4980.00 5945368.12 655374.98 2068.91 0.00 0.00 UG1 UG1
5900.00 43.59 155.28 5129.69 5050.69 5945307.59 655404.36 2133.75 0.00 0.00 MWD
6000.00 43.59 155.28 5202.12 5123.12 5945245.57 655434.47 2200.18 0.00 0.00 MWD
6100.00 43.59 155.28 5274.55 5195.55 5945183.55 655464.58 2266.61 0.00 0.00 MWD
6200.00 43.59 155.28 5346.98 5267.98 5945121.53 655494.69 2333.04 0.00 0.00 MWD
6300.00 43.59 155.28 5419.41 5340.4 1 5945059.51 655524.80 2399.47 0.00 0.00 MWD
6400.00 43.59 155.28 5491.85 5412.85 5944997.49 655554.91 2465.90 0.00 0.00 MWD
6451.30 43.59 155.28 5529.00 5450.00 5944965.68 655570.35 2499.98 0.00 0.00 WS2 WS2
6500.00 43.59 155.28 5564.28 5485.28 5944935.47 655585.02 2532.33 0.00 0.00 MWD
6600.00 43.59 155.28 5636.71 5557.71 5944873.45 655615.13 2598.76 0.00 0.00 MWD
6700.00 43.59 155.28 5709.14 5630.14 5944811.43 655645.24 2665.20 0.00 0.00 MWD
6800.00 43.59 155.28 5781.57 5702.57 5944749.41 655675.35 2731.63 0.00 0.00 MWD
6824.06 43.59 155.28 5799.00 5720.00 5944734.49 655682.59 2747.61 0.00 0.00 WS1 WS1
6900.00 43.59 155.28 5854.00 5775.00 5944687.39 655705.46 2798.06 0.00 0.00 MWD
7000.00 43.59 155.28 5926.43 5847.43 5944625.37 655735.57 2864.49 0.00 0.00 MWD
7100.00 43.59 155.28 5998.87 5919.87 5944563.36 655765.68 2930.92 0.00 0.00 MWD
7107.09 43.59 155.28 6004.00 5925.00 5944558.96 655767.81 2935.63 0.00 0.00 CM3 CM3
7200.00 43.59 155.28 6071.30 5992.30 5944501.34 655795.79 2997.35 0.00 0.00 MWD
7300.00 43.59 155.28 6143.73 6064.73 5944439.32 655825.89 3063.78 0.00 0.00 MWD
7400.00 43.59 155.28 6216.16 6137.16 5944377.30 655856.00 3130.21 0.00 0.00 MWD
7500.00 43.59 155.28 6288.59 6209.59 5944315.28 655886.11 3196.64 0.00 0.00 MWD
7600.00 43.59 155.28 6361.02 6282.02 5944253.26 655916.22 3263.08 0.00 0.00 MWD
· Sperry-Sun - Draft Cop'
Sperry-Sun
Company: BP Amoco Date: 3/23/2004 Time: 10:41 :48 Page: 4
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: A-30, True North
Site: PB A Pad Vertical (TVD) Reference: 79' AS Per Dave W 79.0
Well: A-30 Section (VS) Reference: User (O.OON,O.OOE, 139.75Azi)
Wellpath: Plan A-30A Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD [nel Azim TVD Sys TVD MapN MapE VS DLS TFO Tool Comment
ft deg deg ft ft ft ft ft deg/1 OOft deg
7700.00 43.59 155.28 6433.45 6354.45 5944191.24 655946.33 3329.51 0.00 0.00 MWD
7800.00 43.59 155.28 6505.89 6426.89 5944129.22 655976.44 3395.94 0.00 0.00 MWD
7831.91 43.59 155.28 6529.00 6450.00 5944109.43 655986.05 3417.14 0.00 0.00 CM2 CM2
7900.00 43.59 155.28 6578.32 6499.32 5944067.20 656006.55 3462.37 0.00 0.00 MWD
8000.00 43.59 155.28 6650.75 6571.75 5944005.18 656036.66 3528.80 0.00 0.00 MWD
8100.00 43.59 155.28 6723.18 6644.18 5943943.16 656066.77 3595.23 0.00 0.00 MWD
8200.00 43.59 155.28 6795.61 6716.61 5943881.14 656096.88 3661.66 0.00 0.00 MWD
8300.00 43.59 155.28 6868.04 6789.04 5943819.12 656126.99 3728.09 0.00 0.00 MWD
8400.00 43.59 155.28 6940.48 6861.48 5943757.10 656157.10 3794.52 0.00 0.00 MWD
8500.00 43.59 155.28 7012.91 6933.91 5943695.08 656187.21 3860.96 0.00 0.00 MWD
8600.00 43.59 155.28 7085.34 7006.34 5943633.06 656217.32 3927.39 0.00 0.00 MWD
8700.00 43.59 155.28 7157.77 7078.77 5943571.05 656247.43 3993.82 0.00 0.00 MWD
8800.00 43.59 155.28 7230.20 7151.20 5943509.03 656277.54 4060.25 0.00 0.00 MWD
8839.76 43.59 155.28 7259.00 7180.00 5943484.37 656289.51 4086.66 0.00 0.00 CM1 CM1
8900.00 43.59 155.28 7302.63 7223.63 5943447.01 656307.65 4126.68 0.00 0.00 MWD
9000.00 43.59 155.28 7375.06 7296.06 5943384.99 656337.76 4193.11 0.00 0.00 MWD
9051.91 43.59 155.28 7412.66 7333.66 5943352.79 656353.39 4227.60 0.00 0.00 MWD
9100.00 41.98 153.73 7447.96 7368.96 5943323.61 656368.04 4259.18 4.00 212.56 MWD
9200.00 38.70 150.18 7524.18 7445.18 5943267.11 656399.56 4322.40 4.00 213.70 MWD
9300.00 35.55 146.10 7603.91 7524.91 5943216.50 656432.38 4382.06 4.00 216.40 MWD
9324.57 34.80 145.00 7624.00 7545.00 5943205.00 656440.62 4396.15 4.00 219.66 HRZ HRZ
9400.00 34.80 145.00 7685.94 7606.94 5943170.25 656466.02 4439.01 0.00 0.00 MWD
9500.00 34.80 145.00 7768.06 7689.06 5943124.19 656499.71 4495.84 0.00 0.00 MWD
9568.12 34.80 145.00 7824.00 7745.00 5943092.81 656522.65 4534.55 0.00 0.00 LCU LCU
9600.00 34.80 145.00 7850.18 7771.18 5943078.13 656533.39 4552.67 0.00 0.00 MWD
9700.00 34.80 145.00 7932.29 7853.29 5943032.07 656567.07 4609.49 0.00 0.00 MWD
9750.79 34.80 145.00 7974.00 7895.00 5943008.67 656584.17 4638.36 0.00 0.00 TJF TJF
9800.00 34.80 145.00 8014.41 7935.41 5942986.00 656600.75 4666.32 0.00 0.00 MWD
9836.03 34.80 145.00 8044.00 7965.00 5942969.41 656612.89 4686.80 0.00 0.00 TJE TJE
9900.00 34.80 145.00 8096.53 8017.53 5942939.94 656634.43 4723.15 0.00 0.00 MWD
10000.00 34.80 145.00 8178.65 8099.65 5942893.88 656668.11 4779.98 0.00 0.00 MWD
10100.00 34.80 145.00 8260.76 8181.76 5942847.82 656701.79 4836.81 0.00 0.00 MWD
10200.00 34.80 145.00 8342.88 8263.88 5942801.75 656735.48 4893.63 0.00 0.00 MWD
10300.00 34.80 145.00 8425.00 8346.00 5942755.69 656769.16 4950.46 0.00 0.00 MWD
10323.14 34.80 145.00 8444.00 8365.00 5942745.04 656776.95 4963.61 0.00 0.00 TJD TJD
10400.00 34.80 145.00 8507.12 8428.12 5942709.63 656802.84 5007.29 0.00 0.00 MWD
10414.47 34.80 145.00 8519.00 8440.00 5942702.97 656807.71 5015.51 0.00 0.00 TJC TJC
10500.00 34.80 145.00 8589.24 8510.24 5942663.57 656836.52 5064.12 0.00 0.00 MWD
10591.05 34.80 145.00 8664.00 8585.00 5942621.63 656867.19 5115.86 0.00 0.00 TJB TJB
10600.00 34.80 145.00 8671.35 8592.35 5942617.51 656870.20 5120.95 0.00 0.00 MWD
10700.00 34.80 145.00 8753.47 8674.47 5942571.44 656903.88 5177.77 0.00 0.00 MWD
10773.71 34.80 145.00 8814.00 8735.00 5942537.49 656928.71 5219.66 0.00 0.00 7" 7"
10791.98 34.80 145.00 8829.00 8750.00 5942529.08 656934.86 5230.04 0.00 0.00 TSHU TSHU
10793.19 34.80 145.00 8830.00 8751.00 5942528.52 656935.27 5230.74 0.00 0.00 MWD
10800.00 36.16 145.00 8835.54 8756.54 5942525.33 656937.61 5234.67 20.00 0.00 MWD
10825.00 41.16 145.00 8855.06 8776.06 5942512.73 656946.82 5250.22 20.00 0.00 MWD
10850.00 46.16 145.00 8873.14 8794.14 5942498.80 656957.00 5267.40 20.00 0.00 MWD
10875.00 51.16 145.00 8889.65 8810.65 5942483.65 656968.08 5286.08 20.00 0.00 MWD
10900.00 56.16 145.00 8904.46 8825.46 5942467.41 656979.96 5306.13 20.00 0.00 MWD
10917.99 59.76 145.00 8914.00 8835.00 5942455.10 656988.96 5321.31 20.00 0.00 A-30A Poly A-30A Po
10925.00 61.16 145.00 8917.46 8838.46 5942450.18 656992.56 5327.38 20.00 360.00 MWD
10932.52 62.66 145.00 8921.00 8842.00 5942444.82 656996.47 5333.99 20.00 0.00 A-30A Faul A-30A Fa
· Sperry-Sun - Draft Cop'
Sperry-Sun
Company: BP Amoco Date: 3/23/2004 Time: 10:41 :48 Page: 5
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: A-30, True North
Site: PB A Pad Vertical (TVD) Reference: 79' AS Per Dave W 79.0
Well: A-30 Section (VS) Reference: User (O.OON,O.OOE, 139.75Azi)
Wellpath: Plan A-30A Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD lncl Azim TVD Sys TVD MapN MapE VS DLS TFO Tool Commeut
ft deg deg ft ft ft ft ft deg/100ft deg
10939.21 64.00 145.00 8924.00 8845.00 5942440.00 657000.00 5339.94 20.00 360.00 A-30A n.5 A-30A T"
10950.00 66.10 144.44 8928.55 8849.55 5942432.13 657005.81 5349.69 20.00 346.23 MWD
10975.00 70.96 143.20 8937.70 8858.70 5942413.65 657019.93 5372.89 20.00 346.47 MWD
11000.00 75.84 142.04 8944.84 8865.84 5942394.92 657034.86 5396.81 20.00 346.92 MWD
11025.00 80.72 140.92 8949.92 8870.92 5942376.09 657050.49 5421.27 20.00 347.26 MWD
11050.00 85.60 139.84 8952.90 8873.90 5942357.31 657066.70 5446.08 20.00 347.48 MWD
11067.52 89.02 139.08 8953.72 8874.72 5942344.25 657078.34 5463.58 20.00 347.61 MWD
11100.00 89.02 139.08 8954.27 8875.27 5942320.15 657100.11 5496.05 0.00 0.00 MWD
11200.00 89.02 139.08 8955.98 8876.98 5942245.96 657167.13 5596.03 0.00 0.00 MWD
11300.00 89.02 139.08 8957.69 8878.69 5942171.77 657234.14 5696.01 0.00 0.00 MWD
11370.06 89.02 139.08 8958.89 8879.89 5942119.79 657281.09 5766.05 0.00 0.00 MWD
11383.30 90.00 138.68 8959.00 8880.00 5942110.00 657290.00 5779.29 8.00 337.56 A-30A T2 A-30A T:<
11400.00 91.34 138.68 8958.81 8879.81 5942097.69 657301.28 5795.99 8.00 359.94 MWD
11435.72 94.19 138.68 8957.08 8878.08 5942071.38 657325.38 5831.66 8.00 359.94 MWD
11500.00 94.19 138.68 8952.38 8873.38 5942024.12 657368.69 5895.75 0.00 0.00 MWD
11600.00 94.19 138.68 8945.07 8866.07 5941950.60 657436.06 5995.47 0.00 0.00 MWD
11700.00 94.19 138.68 8937.76 8858.76 5941877.07 657503.43 6095.18 0.00 0.00 MWD
11800.00 94.19 138.68 8930.44 8851.44 5941803.55 657570.80 6194.90 0.00 0.00 MWD
11823.79 94.19 138.68 8928.70 8849.70 5941786.05 657586.83 6218.62 0.00 0.00 MWD
11850.00 94.11 137.10 8926.80 8847.80 5941767.03 657604.75 6244.75 6.00 266.96 MWD
11900.00 93.94 134.10 8923.30 8844.30 5941732.12 657640.37 6294.49 6.00 266.84 MWD
11950.00 93.76 131.10 8919.94 8840.94 5941699.12 657677.77 6343.98 6.00 266.63 MWD
12000.00 93.57 128.10 8916.75 8837.75 5941668.12 657716.85 6393.09 6.00 266.43 MWD
12050.00 93.36 125.10 8913.72 8834.72 5941639.20 657757.52 6441.68 6.00 266.24 MWD
12100.00 93.15 122.10 8910.88 8831.88 5941612.44 657799.65 6489.62 6.00 266.06 MWD
12135.06 93.00 120.00 8909.00 8830.00 5941595.00 657830.00 6522.79 6.00 265.89 A-30A T3 A-30A T2
12150.00 92.85 119.11 8908.24 8829.24 5941587.91 657843.12 6536.79 6.00 260.47 MWD
12200.00 92.35 116.15 8905.97 8826.97 5941565.66 657887.83 6583.05 6.00 260.43 MWD
12250.00 91.84 113.20 8904.14 8825.14 5941545.74 657933.65 6628.30 6.00 260.29 MWD
12300.00 91.33 110.24 8902.76 8823.76 5941528.20 657980.44 6672.42 6.00 260.19 MWD
12350.00 90.81 107.28 8901.83 8822.83 5941513.10 658028.09 6715.26 6.00 260.10 MWD
12400.00 90.29 104.33 8901.35 8822.35 5941500.47 658076.45 6756.74 6.00 260.05 MWD
12450.00 89.77 101.37 8901.32 8822.32 5941490.36 658125.41 6796.71 6.00 260.02 MWD
12469.93 89.56 100.20 8901.44 8822.44 5941487.03 658145.06 6812.21 6.00 260.02 MWD
12488.20 89.56 100.20 8901.58 8822.58 5941484.16 658163.10 6826.30 0.00 180.00 MWD
12500.00 88.89 99.97 8901.73 8822.73 5941482.34 658174.76 6835.38 6.00 198.52 MWD
12550.84 86.00 99.00 8904.00 8825.00 5941475.00 658225.00 6874.12 6.00 198.53 A-30A T4 A-30A T L
12590.05 85.34 96.73 8906.96 8827.96 5941470.44 658263.83 6903.23 6.00 253.67 MWD
12600.00 85.34 96.73 8907.77 8828.77 5941469.48 658273.70 6910.48 0.00 0.00 MWD
12700.00 85.34 96.73 8915.89 8836.89 5941459.82 658372.89 6983.35 0.00 0.00 MWD
12800.00 85.34 96.73 8924.01 8845.01 5941450.17 658472.09 7056.23 0.00 0.00 MWD
12900.00 85.34 96.73 8932.13 8853.13 5941440.51 658571.28 7129.10 0.00 0.00 MWD
13000.00 85.34 96.73 8940.25 8861.25 5941430.86 658670.47 7201.97 0.00 0.00 MWD
13100.00 85.34 96.73 8948.37 8869.37 5941421.20 658769.67 7274.84 0.00 0.00 MWD
13175.23 85.34 96.73 8954.48 8875.48 5941413.94 658844.29 7329.66 0.00 0.00 MWD
13200.00 86.33 96.77 8956.28 8877.28 5941411.54 658868.87 7347.73 4.00 1.97 MWD
13300.00 90.33 96.91 8959.19 8880.19 5941401.68 658968.32 7420.92 4.00 1.97 MWD
13316.77 91.00 96.93 8959.00 8880.00 5941400.00 658985.00 7433.22 4.00 1.97 A-30A T5 A-30A T5
13400.00 94.33 96.93 8955.13 8876.13 5941391.66 659067.70 7494.19 4.00 360.00 MWD
13448.14 96.25 96.93 8950.69 8871.69 5941386.86 659115.39 7529.34 4.00 360.00 MWD
13500.00 96.25 96.93 8945.04 8866.04 5941381.69 659166.68 7567.15 0.00 0.00 MWD
13600.00 96.25 96.93 8934.15 8855.15 5941371.72 659265.58 7640.06 0.00 0.00 MWD
13700.00 96.25 96.93 8923.25 8844.25 5941361.76 659364.47 7712.97 0.00 0.00 MWD
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Prudhoe Bay
PB A Pad
A-30
Plan A-30A
Snrvey
MD Incl Azim
ft deg deg
13800.00 96.25 96.93
13900.00 96.25 96.93
13968.48 96.25 96.93
13968.49 96.25 96.93
. Sperry-Sun - Draft Cop'
Sperry-Sun
Date: 3/23/2004 Time: 10:41 :48 Page: 6
Co-ordinate(NE) Reference: Well: A-30, True North
Vertical (TVD) Reference: 79' AS Per Dave W 79.0
Section (VS) Reference: User (O.OON,O.OOE, 139.75Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
TVD Sys TVD MapN MapE VS DLS TFO Tool
ft ft ft ft ft deg/1 OOft deg
8912.36 8833.36 5941351.79 659463.37 7785.88 0.00 0.00 MWD
8901.46 8822.46 5941341.82 659562.27 7858.79 0.00 0.00 MWD
8894.00 8815.00 5941335.00 659629.99 7908.71 0.00 0.00 41/2"
8894.00 8815.00 5941335.00 659630.00 7908.72 0.00 0.00 Ä-30A T6
Comment
41/2"
A-30A T6
.
TERRIE l HUBBLE
BP EXPLORATION AK INC
PO BOX 196612 MB 7-5
ANCHORAGE, AK 99519-6612
.. Mastercard Check"
PAY TO THE
ORDER OF
First National Alaska
Anchorage, AK 99501
1''\
MEMO H"
1:.25 2000bOI:gg ....lIlb 227111.5 5b"- 0.0 ~
.
89-6/1252
103
DATE
$
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ~80 /l"'~'ðA
PTD# 2 ð£j - () "'1 <6
X Development
Service
CHECK WBA T
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
Exploration
Stratigraphic
~'CLUE"
The permit is for a new wellbore segment of
existing weD
Permit No, API No.
Production. should continue to be reported as
a function ·of the original API number. stated
above.
HOLE In accordance with 20 AAC 25.005(f), all
records, data and logs acquired for the pilot
bole must be clearly differentiated in both
name (name on permit plus PH)
and API Dumber (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved subject ·to fuD
compliance with 20 AAC 25.05S~ Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception. _
(Companv Name) assumes tbe liability of any
protest to tbe spacing .e:Jception that may
occur.
An dry ditcb sample sets submitted to tbe
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from wbere samples are first caught and
] 0' sample intervals tbrough target zones.
.
e
o
o
Disposal
Well bore seg
Annular
Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT A-30A Program DEV
PTD#: 2040780 Company BP EXPLORATION (ALASKA) INC nitial ClasslType DEV 11-01L GeoArea 890 Unit 11650 On/Off Shore On
Administration 1 Pe (n') it fee attaches.!. ~ - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - -
2 .LeaseMmberappropriate. . . . . . . . . . . - - - - - - - Yes - - - - - - - - - - - - - -
3 .UJ1lque weltname.and oumb.er . . . . . . . . . . . . . . . . . . . . . . ...... .. .Yes - - - - - - ~ - - - - - - - - - - - - - - - - - ~
4 WeJUocated in.a.d.efines.lppol . . . . . . - - - - - - - Yes - - - - - - - - - - - - -
5 WellJocated pr.oper .distance. from driJling unitb.ound.ary. . - - - - - - Yes - - - - - - - - - - - -
6 WellJocated prpper s.!lstance. from other wells. . - - - - - - . . . . . Yes - - - - - - - - - - - - - - - - -
7 .S.utficient acreage.aYailable in.drilliog unjt . . . . . . . . . - - - - - Yes - - - - - - - - - - - - -
8 Jtdeviated, js. weJlbore platincJu.ded . . . - - - - - - - -- - - - - - - Yes - - - - - -- - - - - - - - -
9 .Operator only affected party. - - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - -
10 .Operator bas.apprppriate.~ond lnJorce . . . . . . . . . . . . . . . . - - - - -- .. Yes - - - - - - - - - - - - - - - - - - - - - - - --
11 Permit c.aD be issued wjtbout co.nserva.tion order. . . - - - - - - .. Yes - - - - - - - - - - - - - - -- - - - - - -
Appr Date 12 Permit can be issued wjtbout admini$tratille.apprpval . . . . . . . ..... Yes - - - - - - - - - - - - - - - - - - - - - - -
RPC 5/7/2004 13 Can permit be approved before 15-day wait Yes
14 WelUocated within area and. strata authorized by.lDjectipo Order # (putlOfJ in.c.ornmeDts).{for. NA - - - - - - - - - - - - - - - - - - - -
15 AJI wells. within .1l4.mite .area.of reyiew ideot[fied (F.or ~ervjce well Only). . . . . . . . . . . . . . . NA - - - - - - - - - ~ - - - - - - - - - - - - - - -
16 Pre-produ.ced injector; s.!uration.of pre-pros.!uction les~ than :3 months (for.ser:.vlce well onJy) . . .NA - - - - - - - - - - - - - - - - - - - - - - - -
17 .AGMPF:inding.of ConSi$teDcyh.as beenj~sued~ for.tbis proiect NA - - - - - - - - - - -.-
Engineering 18 .C.onductor $tring:provided . . . . . - - - - - - -- NA ~ Sidetrack. ~ - - - -
19 Sudaceca~ing.protect~ all.known. USDWs . ~ .NA - - - - - - - ~ - - - - - -
20 CMT v.ot adeQ uate to circ.utate oncpnd~uctor. & $u.rf C$9 - - - - - .. NA - - - -
21 .CMT v.ot adequ.ate.to tie-in Jong .string tosud ~g. - - - - . NA - - - - - - - - - - - - - - - -
22 .CMT will coyera)l!<nOw.n .prQductiye l1oriz:on.s. Yes - - - - - - - - - - - - -
23 .C.asiDg design$ ad.equate f.or C,.T~ B.&.permafr.ost . . . . Yes - - - - - -
24 Adequate .tankage OJ re.serye pit . . . . Yes . . . . . Nabors.7.ES, . - - - -
25 JfaJe-drilt bas. a. to-403 fQr abandonme.nt beeo approved ~ . . . . Yes ~ ~ ~ . . 4/21/2004.. . . . ~ - - - - - -
26 As.!equate wellbore ~eparatjo.n -Propo&ed. . . . . . . . . . . . . . . . . . . ... .Yes - - - - - - - - - - - . - - - - - - - - - - - - -
27 Jf.djvecter reqJ,Jired, does jtmeet reguJatipns. ~ . . . . . ~ ~ ~ ~ ~ . . . . . NA - - - - - - - --
Appr Date 28 .Drilling fJujd. program sc.hematic.&. eq.uip Jistadequale. ~ . ~ ~ . .Yes . . Max MW 11 ,O.ppg.. . - - - - - -
WGA 5/10/2004 29 .BO.PEs,. d.othey meet reguJa.tion ~ - - - - -- - - - - - - - - - Yes - - - - - - - - - - - - - - - -
30 .BOPEpress rating appropriate; test to (put p$ig in .comments). . . . . . · . . .Yes . Test to 35QO. psi. .MSfl23.50 psi.
31 Choke. manifold compJie~ w/APtRfI-53 (May 64). . ~ ~ ~ . . . . . · . . .Yes - - - - - - - - - - -
32 Work will occur withputoperationsl1utdo.wn. . . ~ . ~ . . . . . .Yes - - - - - - - - - - -
33 J& pres.eDce. of H2S gas. prob.able ~ - - - - - - - - - - - - - - - - - .Yes . . . . . 2QO.ppm,
34 Mecha.nicaU:pndjt[on .of wells within J\OB. yeriJied (fpr. service welJ only) .. .NA - - - - -
Geology 35 .Permit caD be issued wlo. hydrogen s.ulfide meas.ures · . . .No. - - - - -
36 .D.ata. presented on. pote.ntial .overpres.sure .ZOnes. . NA
Appr Date 37 Sei$micanalysjs. of slJaJlow gas. zones .. .NA
. .. - - - - -
RPC 5/7/2004 38 .Seabedcondjtipo survey (if Off-$h.ore) NA
- - - - -
39 . Conta.ct narn ¡.for.weekly pro )rts [I NA
Geologic Date: Engineering Date Y0y
Commissioner: Commissioner:
DrS S;j/oN