REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate❑ Other Q TUBING PATCH
Performed: Alter Casing ❑ Pull Tubing❑ Perforate New Pool ❑ waiver[] Time Extension ❑ 11172 -11197
Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development ❑r Exploratory ❑ " 196 -1300
3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number:
Anchorage, AK 99519- 6612 `" 50- 029 - 20676 -02 -00
8. Property Designation (Lease Number) : 4 9. Well Name and Number:
ADLO- 047475 PBU X -19B
10. Field /Pool(s):
PRUDHOE BAY FIELD / PRUDHOE OIL POOL
11. Present Well Condition Summary:
Total Depth measured 14085 feet Plugs (measured) .1+iert€" feet
true vertical 9081.14 feet Junk (measured) None feet
Effective Depth measured 1150 feet Packer (measured) 7220 11186 11369 feet
true vertical 8994 feet (true vertical) 6550 8832 8930 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 110' 20" X 30" SURFACE - 149 SURFACE -149
Surface 2664' 13 -3/8" 72# L -80 SURFACE 2703 SURFACE - 2624 5380 2670
Intermediate
Production 7374' 9 -5/8" 47# L -80 SURFACE 7413 SURFACE - 6724 6870 4760
Liner 4217' 7" 26# L -80 7211 - 11880 6542 - 8999 7240 5410
Sidetrack Liner 2674' 4 -1/2" 12.6# L -80 11402 - 14076 8948 - 9079 8430 7500
Perforation depth: Measured depth: SEE ATTACHED -
True Vertical depth:
Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 SURFACE - 11232 SURFACE - 8857
Packers and SSSV (type, measured and true vertical depth) 9 -5/8" X 7" BKR PKR 7220 6550
7" X 4 -1/2" BKR S -3 PKR 11186 8832
7" X 4 -1/2" BKR ML PKR 11369 8930
7" X 4-1/2" BKR ZXP PKR 11388 8940
10 m00% 0014 00— 124
12. Stimulation or cement squeeze summary: U p ry r, f� "'
Intervals treated (measured): ` "al C E! tt7 way
NOV 2 4 2090
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injecti � son
Oil -Bbl Gas -Mcf Water -Bbl Casing P re ure Tubing pressure
Prior to well operation: SI
Subsequent to operation:
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory[] Development Q a Service ❑ Stratigraphic ❑
Daily Report of Well Operations X 16. Well Status after work: Oil r Gas WDSPL
I GSTOR ❑ WINJ ❑ WAG❑ GINJ ❑ SUSP❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
NA
Contact Joe Lastufka
Printed NarrOke Last a Title Data Manager
Signatui Phone 564 -4091 Date 11/22/2010
RBDIV�S NOV 6 X10 �` 1 �2. _ �p
Form 10 -404 Revised 10/2010 Submit Original Only
X -19B
196 -130
PERF ATTACHMENT
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Tor Tvd Depth Bas
X -19B 9/15/96 PER 11,510. 11,550. 8,995.91 9,003.79
X -19B 9/15/96 PER 13,860. 13,870. 9,037.93 9,039.21
X -19B 9/15/96 PER 13,700. 13,810. 9,030.67 9,033.9
X -19B 9/15/96 PER 13,410. 13,550. 9,022.71 9,025.21
X-1 9B 9/15/96 PER 12,650. 13,140. 9,007.71 9,020.
X -19B 9/15/96 PER 13,260. 13,300. 9,022.22 9,022.27
X -19B 9/15/96 PER 12,010. 12,110. 9,003.52 9,006.75
X -19B 9/15/96 PER 11,890. 11,960. 8,999.67 9,001.47
X -19B 9/15/96 PER 11,700. 11,830. 8,999.47 8,998.74
X-1 9B 9/15/96 PER 11,610. 11,650. 9,004.31 9,002.21
X -19B 9/15/96 PER 12,180. 12,550. 9,008.49 9,007.8 •
X -19BL1 10/14/96 SL 11,383. 12,681. 8,937.27 8,941.74
X -19131-2 10/7/10 SL 13,217. 13,490. 9,005.92 9,005.1
X- 19BL2 -01 10/13/10 SL 12,687. 13,248. 9,001.14 9,003.49
r X- 19131-2 -01 10/13/10 SL 13,490. 14,191. 8,997.15 9,051.43
X -19B 11/9/10 BPS 11,201. 11,202. 8,839.79 8,840.33
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG PULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
-F-C-0-FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL I SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH I OPEN HOLE •
I
• 1 0
X -19B
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
11/7/20101 ***WELL S/I ON ARRIVAL * **
DRIFTED TO DEVIATION @ 11440' SLM /11450' ELMD W/ 3.70" x 20' DMY
WHIPSTOCK.
!RAN 3.50" CENT, TEL, DUAL GAUGES AS PER PROGRAM. ?
[ BRUSHED TBG. & ALL X- NIPPLE W/ 3.805" G.RING, 4 -1/2" BRUSH.
SET 4 -1/2" x 2 -7/8" NIPPLE REDUCER IN X- NIPPLE @ 11 201' SLM/11220' MD.
** *CONTINUED ON 11 -08 -10 WSR * **
11 /8/2010�T/I /O= 400/40/0 CMIT TxIA to 3000 psi. Pumped 13.85 bbls diesel down y
!tubing to bring pressure up to 2500 psi. before plug packing gave way and pressure
'fell off instantly. Slickline reran plug. Attempt to CMIT x IA to 3000 psi. Had tbg
;pressure up to 2300 psi w/ 11 bbls diesel pumped away. Pressure suddenly started l
to fall. Shutdown. Monitor tbg pressure. Tbg pressure fell to 300 psi. IA pressure
I fell to 340 psi. CMIT failed. Call slickline WSL. RD. FWHP= 300/340/0. ** *Swab,
SSV, & wing shut. Master, IA, & OA open. * **
i
I � '
11 /8/2010 i Load fluid/ Stand by on location Continued on 11 -9-10 I
i
i €
I
11/8/201 ** *CONTINUED FROM 11 -07 -10 WSR * **
SET & PULLED 2 -7/8" XX -PLUG IN 4 -1/2" NIPPLE REDUCER @ 11201'
SLM/1 1220'MD.
LRS PERFORMED FAILING CMIT -TxIA, PACKING ON 2 -7/8" XX -PLUG TORN,
i METAL SHAVING IN PLUG BODY.
SET 2 -7/8" XX -PLUG IN 4 -1/2" NIPPLE REDUCER IN X- NIPPLE @ 11201'
!SLM/11220' MD.
ARAN 2 -7/8" CHECKSET TO XX -PLUG IN NIPPLE REDUCER @ 11201' SLM/11220. 1
MD. GOOD SET.
1 ** *TURNED WELL OVER TO LRS FOR CMIT - TxIA * **
• I,I
. III
11/8/2010I ON
EQ. & PULL /8" XX FROM NIPPLE REDUCER @ 11,207' SLM/1 1,220'MD
* * *CONT WSR ON 11- 09 -10 * **
1 '
9
11 3 j
I { i
t
€ kk
11/9/20101* *Continued from 11- 8 -10 ** T /1 /0= 300/120/20 Temp =S1 Assist S -line CMIT TxIA
E 3000 psi PASSED (Reestablish well integrity post -CTD) Pumped 14.1 bbls of 50*
crude down TBG to reach 3000 psi for CMIT TxIA 1st test 1st 15 min lost 60/40 psi
'2nd 15 min lost 20/20 psi for a total of 80/60 psi in 30 min Bleed well head psi down
bleed back aprox. 10 bbls Wing shut swab shut ssv shut master open casing valves
$open to gauges Final Whp's= 500/400/20
E
i
11/9/20101 * * *CONT WSR FROM 11- 08 -10 * **
PULL 4 -1/2" x 2 -7/8" NIPPLE REDUCER FROM 11,201' SLM/11,220' MD. '
€SET 4 -1/2" x 2 -7/8" NIPPLE REDUCER FROM 11201' SLM /11220' MD.
SET 2 -7/8" XX -PLUG IN NIPPLE REDUCER @ 11201 SLM/11220' MD.
** *TURNED WELL OVER TO LRS FOR CMIT- TxIA * **
� l
i
a
11/15/20101** *DID NOT START PERMIT OR LOOK AT WELL * ** (ELINE: PATCH)
1ARRIVED ON LOCATION BUT UNABLE TO START JOB DUE TO HIGH
INCREASING WINDS, TOO HIGH FOR MANLIFT.
** *JOB POSTPONED AND NOT COMPLETE, DSO NOTIFIED OF DEPARTURE * ** 1
i
i
l
1
11/18/2010= ** *WELL SHUT -IN ON ARRIVAL ** *(ELINE - PATCH) E
INITIAL T /I /O = 500/300/0
aSET 25' BAKER "KB" STRADDLE PATCH, TOP MID ELEMENT = 11172', BOTTOM 1
1MID ELEMENT = 11197', DEPTH REFERENCED TO SLB LEAK DETECT LOG,
!DATED 19- JUNE -2007.
'SAW DRAG AND OVER PULL DURING TIE -IN AT GLM #1.
FINIAL T /I /O = 500/350/0
;WELL SHUT -IN ON DEPARTURE, DSO NOTIFIED.
* *JOB COMPLETE * **
11/19/2010!T/1/0=300/300/0 ( MITx IA to 3000 Psi passed) Pumped 7 bbls diesel down IA to
achieve a test pressure of 3000 Psi. ( MITx IA ) IA lost 80 Psi in 1st 15 Min. and 40
'Psi in 2nd 15 Min for a total loss of 120 Psi in 30 Min Test. RDMO. FWHP=
350/500/0 / wing =shut / swab= shut / ssv =shut / master =open / IA and OA open to
gauges. Operator notified. ( Performed engine room fire drill on unit )
I
c
_�_ . m_ .. ___ _ _.�
FLUIDS PUMPED
BBL
35 DIESEL
14 CRUDE
49 TOTAL
TREE= 4- 1/16" C McE W 0 1 9
W ELLHEAD = McEVOY - SAFETY NOM WELL ANGLE > 70° @ 11500'
ACTUATOR = OTIS L 1 L2 & 12 41
KB. ELEV = 67.68'
BF. R EV = 37.98'
MaxAngle = 94 @ 121830' D R L G DRAFT 2087' 4 -1/2" HES HXO SSSVN, ID = 3.813"
Datum MD = 11256' GAS LIFT MANDRELS
DatumTVD= 8800' SS ST MD TV DEV TYPE JVLV LATCH PORT DATE
6 3008 2813 34 MMG-M DOME RK r 16 05/15/09
13 -3/8" CSG, 72 #, L -80, ID = 12.347" 2703' 5 5306 4787 30 MMG -M DOME RK 16 05/15/09
4 7067 6344 26 MMG -M DOME RK 16 05/15/09
BKR TIEBACK SLV, ID = 7.500" 7212' 3 8711 7443 59 KBG-2LS DOM INT 16 05/15/09
2 10182 8238 58 KBG-2L DMY INT 0 06/07/00
9 -518" X 7" BKR ZXP PKR, ID = 6.313" 7220' �1 11026 8676 57 KBG 2L SO INT 24 05/15/09
9 -5($" X 7" BKR HMC HGR, ID = 6.250" 7226' I 9- 518 "MILLOUT WINDOW (X-1 9B) 7413' - 7429'
9 -5J8" CSG, 47 #, L -80, ID = 8.681" 7413'
4 -1/2" BKR PATCH (09/01/07), ID = 2.45" 96' A 0 11176 4 -1/2" HES X NIP, ID = 3.813" (BEHINE PATCH)
pull & rerun 11163' - 57 7" x 4 -1/2" BKR S -3 PKR, ID = 3.875"
Minimum ID = 2.313" @ 11220 11209 —�4 1t2" HES X NIP, ID= 3.813"
4 -1/2" REDUCING NIPPLE 11220' a -1/2" HES X NIP, ID= 3.813 "�
11220 2 -7(8" REDUCING NIP, ID = 2.313" {11!09/10)
4 -1/2" TBG, 12.6 #, L-80_0152 bpf, ID = 3.958" 11232' 11220 — 2 -7/8" XX PLUG (11/09110)
RA PIP TAG 11268 11233 4 -1/2" WLEG, ID= 3.958 "�
11232 ELMD l LOGGED 10/30196
7" MILLOUT WINDOW (X -19B L1) 11354'-11366
.,� 11381 Top of 4 -1/2" liner, ID= 3.93"
57 �.,
BTM 4 -1/2" SLID LNR
7" X 4 -1/2" BKR ML PKR, ID = 3.875 — 11369'
BKR C-2 TIEBACK SLV, ID = 5150" 11388' `
4 -1/2" HES M NIP, ID milled to = 3.80" 11390' �'' L1
4 -1/2" W LEG, ID = 3.958" 11393'
T' X4 -1/2" BKR ZXP PKR, ID 4 -112" SLTD LNR, 12.6 #, L -80, 12700'
7" X4 -1/2" BKR HMC HGR, ID = 4,408" 11402 1 .0152 bpf, ID = 3.958" _TD 13138'
7" LNR, 26 #, L-80_0383 bpf, ID = 6.276 — 11428 7" MILLOUT WINDOW ( X-1 9B) 11428' - 11440'
cased to 11880' 2 -7/8" SLOTTED /SOLID LINER 11580-14191
3.8" MILLOUT WINDOW ( X -1913 L2 ) 11518' -
11526' -
PERFORATION SUMMARY 75 �=- X2-01
REF LOG: TCP PERF r� '
ANGLE AT TOP PERF: @ NIA
Note: Refer to Production DB for historical pert data 9 ) 0 - ,
SI ZE SPF INTERVAL Opn /S DATE
See Page 2 for Perforation Data 13988 PBTD
�LVR,
4 -112" LNR, 12.6 #, L -80, .0152 bpf, ID = 3.958" 14076' �— 2 -7/8" SOLID /SLOTTED LINER — 11581 -143 `
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
3/611982 N18E ORIGINAL COMPLETION WELL: X -19B ML
05107/93 N18E SIDETRACK (X -19A) PERMIT NO. 1961300, (310) / 2101030, (40)
10/06196 N18E M ULTI -LAT COM PL (X -19B M L) API No: 50 -029- 20676 -02 / 60 / 61 / 62
10/16/10 I NORDIC qCTD ML (X -19B L2 & L2 -01) SEC 5, T10N, T14E 356' FSL & 137' FWL
10/23110 PJC I DRLG HO CORRECTIONS
11/18/101 PJC ISET NIP RED! XX PLUG (11109/10) BP Exploration (Alaska)
X-1 9B
DRLG DRAFT L1 LZ & 12 -01
PERFORATION SUMMARY
REF LOG: TCP PERF
ANGLE AT TOP PERF: @ N/A
Note: Refer to Production DB for historical pert data B
SIZE I SPF INTERVAL I Opn /Sqz DATE
X-19B
2 -3/4" 4 11510 - 11550 O 09/15/96
2 -3/4" 4 11610 - 11650 O 09/15/96
2 -3/4" 4 11700 - 11830 O 09/15/96
2 -3/4" 4 11890 - 11960 O 09/15/96
2 -3/4" 4 12010 - 12110 O 09/15/96
2 -3/4" 4 12180 - 12550 O 09/15/96
2 -3/4" 4 12650 - 13140 O 09/15/96
2 -3/4" 4 13260 - 13300 O 09/15/96 1
2 -3/4" 4 13410 - 13550 O 09/15/96
2 -3/4" 4 13700 - 13810 O 09/15/96
2 -3/4" 4 13860 - 13870 O 09/15/96
X-1913 / L1
4 -1/2" I SLTDC 11383 -12681 I O 110/6/1996
X-198/L2
4 -1/2" SLTD 13217 - 13490 O 10/07/10
X-19B / L2' =01
4 -1/2" SLTD 12687 - 13248 O 10/13/10 TD 1 3138'
4 -1/2" SLTD 13490 - 14191 O 10/13/10
+• a 8
90° �
TB;
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
3/6/1982 N18E ORIGINAL COMPLETION WELL: X -19B ML
05/07/93 N18E SIDETRACK (X -19A) PERMIT NO. 1961300, (310) t 2101030, (40)
10/06196 N18E M ULTI -LAT COM PL (X -1913 M L) API No: 50- 029 - 20676 -02 ! 60 / 61 / 62
10/16/10 NORDIC ACTD ML (X -19B L2 & L2.01) SEC 5, T10N, T14E 356' FSL & 137' FWL
10/23/10 PJC I DRLG HO CORRECTIONS
11/18/10 PJC SET NIP RED/ XX PLUG (11/09/10) BP Exploration (Alaska)
WELL LOG
S TRANSMfTTAL
9~
PeoAcme DincNOSric SeavicES, (lvc.
To: AOGCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907j 793-1225
RE : Cased Hole/Open Hole/Mechanical Lags and /or Tubing Inspection(Caliper/ MTTj
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning
a signed copy of this transmittal letter to the following
ProActive Diagnostic Services, Inc.
Attn: Robert A. Richey
130 West International Airport Road , ty<~"~L~ ~~~ ~, `~ ~(~~~,
Suite C
Anchorage, AK 99518
Fax: (907j 245-8952
1) Leak Detection - WLD 12-Fetr10 X-196 1 BL/ EDE 50-029-20676-02
2j
'~~'~~~
~~3~~
~,_ _ -
_ __
Signed : Date
- ~_ ,
Print Name: ~ ° ~ ' '
PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518
PHONE: (907)245-8951 FAX: (907)245-88952
E-MAIL _ . _ ~ ~ s~ WEBSITE : _ ~ d
C"Documents and Settings'~Diane Williams~Desktop\Transmi[_Conoco.decx
RECEIVt::U ~
. STATE OF ALASKA. e--/~P?
ALASKA OIL AND GAS CONSERVATION COM lòrt 1 2007 ~~Ilí
REPORT OF SUNDRY WELL 11IQN§s. G(}mmission
D StimulateDAnChorage Other 0 TUBING PATCH
D Waiver D Time Extension D
D Re-enter Suspended Well D
5. Permit to Drill Number:
...
~
1. Operations Abandon D Repair Well D
Performed: Alter Casing D Pull Tubing D
Change Approved Program D Ope rat. Shutdown D
2. Operator BP Exploration (Alaska), Inc.
Name:
P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
3. Address:
68.23 KB-
8. Property Designation:
ADLO-047475 -
11. Present Well Condition Summary:
Plug Perforations
Perforate New Pool
Perforate
4. Current Well Class:
Development P
Stratigraphic
Exploratory
Service
9. Well Name and Number:
196-1300
6. API Number:
50-029-20676-02-00 -
PBU X-19B
10. Field/Pool(s):
PRUDHOE BAY Field/ PRUDHOE OIL Pool
Total Depth measured 14085 / feet Plugs (measured)
true vertical 9081.14 feet Junk (measured)
Effective Depth measured 11502 feet 1 9 2007
true vertical 8994 feet S,C~~NEtJì SEP
Casing Length Size MD TVD
Conductor 110' 20"x30" Surface - 149' Su rface - 149'
Surface 2664' 13-3/8" 72# L-80 Surface - 2703' Surface - 2624'
Production 7374' 9-5/8" 47# L-80 Surface - 7413' Surface - 6724'
Liner 4217' 7" 26# L-80 7211' 11880' 6542' - 8999'
Sidetrack Liner 2674' 4-1/2" 12.6# L-80 11402' - 14076' 8948' - 9079'
Perforation depth: Measured depth: 11510-11550
12180-12550
13860-13870
True Vertical depth: 8996-9004
9009-9008
9037-9039
Tubing: (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
309
SHUT-IN
x
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
699 742 0
o 0 0
15. Well Class after oroposed work:
Exploratory Development P
16. Well Status after proposed work:
Oil P Gas WAG
11610-11650
12650-13140
11700-11830
13260-13300
9004-9002
9008-9020
8999-8999
9022-9022
4-1/2" 12.6#
L-80
7"X4-1/2" BAKER S-3
7"X4-1/2" BAKER HMC LINER HGR/PKR TIE-I
4-1/2" HES X SSSVLN
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Gary Preble
Signature
Title Data Management Engineer
Phone 564-4944
Form 10-404 Revised 04/2006
ORIGINAL
RBDMS 8Ft SfP 1 9 2DD7
None
None
Bu rst
Collapse
5380
6870
7240
8430
2670
4760
5410
7500
11890-11960
13410-13550
12010-12110
13700-13810
9000-9002
9023-9025
9004-9007
9030-9033
Surface - 11232'
11186'
11388'
2087'
Tubing pressure
233
o
Serllice
WINJ
WDSPL
Sundry Number or N/A if C.O. Exempt:
N/A
Date 9/10/2007
S,i~ß?
~
.
.
'"
X -19B
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
8/28/2007 ***WELL SII ON ARRIVAL*** (pre patch)
PULLED 2 7/8 XX PLUG FROM NIPPLE REDUCER @ 11 ,230'SLM .
DRIFTED W/DUMMY PATCH (3.70" OD, 9' OAL)
UNABLE TO WORK PAST 11,031' SLM
RAN 3.75" GAUGE RING TO 11230' SLM
RIH WI 10' x 3.70" DMYWHIPSTOCK
***JOB CONTINUED ON 08-29-07 WSR ***
JOB CONTINUED FROM 08-28-07 WSR *** (drift tbg)
DRIFTED TBG WI 3.70" x 10' DMY WHIPSTOCK
NIP REDUCER @ 11,232' SLM NO PROBLEMS
*** LEFT WELL SHUT IN ***
***WELL SHUT IN ARRIVAL***
INITIAL TIIIO = 0/40010 PSI
SET 4.5" x 39.5' BAKER PATCH FROM 11,162.5' TO 11,196'.
MIN I.D. = 2.45"
FINAL TIIIO = 0/40010 PSI
WELL LEFT SHUT IN
***JOB COMPLETE***
FLUIDS PUMPED
BBLS I
2 DIESEL
2 TOTAL
OPERABLE WELL - INTERNAL WVER CANCELLATION: X-19B (#1961300) Tubing integrity... Page 1 of 1
.
Regg, James B (DOA)
From: NSU, ADW Well Integrity Engineer [NSUADWWelllntegrityEngineer@BP.com]
Sent: Monday, September 03, 2007 5:02 PM
To: Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; Regg, James B (DOA); Maunder,
Thomas E (DOA); GPB, Area Mgr Central (GC1/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Subekti,
Herry; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers; NSU, ADW WI Tech
Cc: NSU, ADWWelllntegrity Engineer; Lau, John, Jack
Subject: OPERABLE WELL -INTERNAL WAIVER CANCELLATION: X-19B (#1961300) Tubing integrity restored with
patch
12ê-ff q/s ô 7
Hi all,
r/
Well X-19B (#1961300) was operating as a Dispensated well under waiver for TxlA Communication issued 03/17/06. A tubing
patch was set on 9/1/07 and a subsequent MITIA passed to 2400 psi on 9/2/07. The well is now classified as Operable and may
be produced once live gas lift valves have been set. Please remove the waivered well signs from the well house.
Thank you,
}lnna (])u6e, æ f£.
Well Integrity Coordinator
GPB Wells Group
Phone: (907) 659-5102
Pager: (907) 659-5100 x1154
CID' SEP 1 1 Z007
SCANNJ.,,·
9/512007
Scblumberger
I 0G -/w
r '''E· ··~PJEl)
R, E (~~"'
07/27/07
NO. 4346
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
JUL 3 0 Z007
¡~.aOil&Gascons.co~~NED AUG 012007
Anctloratje
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Endicott
Well Job# Loa Descriotion Date BL Color CD
3-25/L-27 11686762 STATIC PRESSURE SURVEY 07/09/07 1
4-18/S-30 11813062 STATIC PRESSURE SURVEY 07/10/07 1
2-50/U-08 11676953 LDL 07/13/07 1
1-61/Q-20 11695066 SBHP SURVEY 07/13/07 1
3-41/K-39 11846795 WFL & PRESS GRADIENT 07/17/07 1
1-41/0-23 11695068 INJECTION PROFILE 07/24/07 1
3-41/K-39 11846795 ¡PROF & JEWELRY 07/16/07 1
L 1-09 11626109 LDL 06/27/07 1
02-30B 11626108 LDL 06/25/07 1
H-07A 11637346 LDL 06/30/07 1
12-05A 11638649 FPIT 07/04/07 1
12-12A 11661162 MEM STATIC TEMP/JEWELRY 07/05/07 1
P2-08 11686761 STATIC PRESSURE SURVEY 07/05/07 1
17-02 11745227 MEM GLS 07/10/07 1
09-11 11686765 STATIC PRESSURE SURVEY 07/11/07 1
X-19B 11801075 LDL 06/19/07 1
MPK-30 11676952 FPIT 07/12/07 1
11-08 11813061 STATIC PRESSURE SURVEY 07/07/07 1
03-14A 11849926 BHP SURVEY 07/25/07 1
01-16 11630486 PROD PROFILE 06/28/07 1
MPH-17 11813063 CBL & IMAGE LOG 07/21/07 1
01-15A 11849924 USIT 07/20/07 1
02-30B 11813058 USIT 07/04/07 1
MPJ-24 11638647 USIT 06/29/07 1
E-101 11630488 PRODUCTION PROFILE 06/30/07 1
G-18A 11209612 MCNL 07/19/06 1 1
.
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
Received by:
gCtJ
X-19B TxIA03-17-06.jpg (JPEG Image, 670_ pixels)
~¡ A-\1\Û'P
1
I of 1
e
f>rb
lQ<o- 130
Notice of WaiveredWelJ
WELL: )I(-19B
WELL TYPE; PfO!lI.lCCr· GasliftCd
DATE;
03·17·06
Þr(lductlon Data: 01/20lC6: 343 eopo. 7S1;1 ôWPO, 2.2 MGOR, 3.1 mrn GL ~;)l""
Pre$sures:
Ffò'wing
$1
11,11:<1'4
290 p.si
1781;1 Psi
Jnner Annulus
1660 psi
751;1 ¡:,sÎ
OUle-! An(I\)[·.;I$
540p$Ì
\lA.C
REASON FOR NOTICE: TxIA Communication
COMMUNICATION INDICAtED BY:
· 11 FL Failed· 05.100/99.
PRODUCTION CASING INTEGRITY DEMONSTRATED BV:
· CMIT-TxIA PS$1iied to 2,,00 psi - 03114108.
TUBING; lEAl( 1$ OI$MON$TRATEO MANAGEABLE BY:
· NFT·IA. p;)$$.x!, lin(!1 gas rate 31.) $C1ph . 00/18105.
SURFACE CASING INTEGRITY DEMONSTRATEDBY;
· Mrr-oA Pas$ed to 2400 psi -c...'\'1 ~.'D6.
IMPORTANT CON$1DERATlONSI COMMëNTS:
· 2. Levels at protec1ìc."t are comp<:1ent p;wuc¡ian <:aslng and sutfa~e casing which MvtJ' beeñ le-steCl1" ÆlÎ IMsl 1.<: lirY\{}$ Ib¢ maximum
a.t'''iciþllloo shut in pressure.
· This wal'/er supercedes the v¡aiver (Jal«J 11/05lO2,
PLAN Of ACTION:
AAY devii\tlon '¡'(1m thiswaiVormu$tbc pr'C-approl/ccI by the WofJs Group and tnøOpøratlons Manager.
<:¡~t;.'
~
,
· Monitor l'Iêll hé.ad pressures and leg daily.
· Per10tm 1M IQIIO\\'ing (;i¡J¡gnO$líè 10sllng:
. Annually demons1lale production oa5Jng 1?legrity.'
-Annually demonstrate sudacc ca$Ù'II ir\10gril}1\
. Annually demom,lraíe the tubing teak Is manageahle_
Operating Limi1s
Max lAP... 2000 )$i
Max OAP" 1000 psi
WelllmegrityCCO!dinator
/~U.~
<:11 OpetilliOO$ $upOrVi)ó1
j~~
Area t.1S!".<lger
d/~z/2!;>-r.:.1o
D..'\1e
Da1e
ClstrlbÙtlon:
DS r p~:! D:K>",:x>r
-OS l P.ãd En!.;íit2Ûr
W(;J!:¡
Dale
SCANNEr) APR 1 9 2.DD5
4/4/2006 4:06 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _
Acid Stirn Pull tubing _ Alter casing _ Repair well _ Other _
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
5. Type of Well:
Development __X
Exploratory__
Stratigraph lc__
Service__
4. Location of well at surface
355' FSL, 137' FWL, Sec. 05, T10N, R14E, UM
At top of productive interval
4638' FNL, 2296' FEL, Sec. 07, T10N, R14E, UM
At effective depth
645' FSL, 2309' FEL, Sec. 07, T10N, R14E, UM
At total depth
1425' FNL, 1217' FWL, Sec. 18, T10N, R14E, UM
(asp's 666012, 5940488)
(asp's n/a)
(asp's 663693, 5935446)
(asp's 662207, 5933343)
12. Present well condition summary
6. Datum elevation (DF or KB feet)
RKB 68 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
X-19B
Total depth:
Effective depth:
measured
true vertical
measured
true vertical
Casing Length
Conductor 110'
Surface 2664'
Production 7374'
Liner 4217'
Sidetrack Liner 2674'
14085 feet Plugs (measured)
9081 feet
11502 feet Junk (measured)
8994 feet
Size Cemented
20" x 30" 72 c.f. concrete
13-3/8" 3906 c.f. Arctic Set II
9-5/8" 1300 cf C 'G', 130 cf AS I
7-" 460 c.f. Class 'G'
4-1/2" 387 c.f. Class 'G'
9. Permit number / approval number
196-130
10. APl number
50-029-20676-02 ,,~
11. Field / Pool
c:~
c,,,j o
Prudhoe Bay Oil Pool
ID Tag @ 11502'. (05/0 9)
Measured Depth True Vertical Depth
149' 149'
2703' 2624'
7413' 6724'
7211' - 1 1428' 6542' - 8961'
11402' - 14076' 8948' - 9079'
Perforation depth:
true:vertical
Tubing (size, grade, and measured depth)
Packers & SSSV (type & measured depth)
measuredOpenPerfs 11510-11550, 11610- 11650, 11700-11830, 11890-11960, 12010-12110,
12180-12550, 12650-13140, 13260-13300, 13410-13550, 13700-13810, 13860-13870
Open Perfs 8996 - 9004, 9004 - 9002, 8999 - 8999, 9000 - 9002, 9004 - 9007,
9009 - 9008, 9008 - 9020, 9022 - 9022, 9023 - 9025, 9030 - 9033, 9037 - 9039
4-1/2", 12.6#, L-80 TBG @ 11186' MD, w/Tubing Tail @ 11233'.
One joint of 4-1/2", 12.6#, L-80 TBG from 11369 to 11393.
7" x 4-1/2" Baker S-3 PKR @ 11186', 7" x 4-1/2" Baker ML PKR ASSY @ 11369.
7" x 4-1/2" Baker HMC Liner HGR/PKR Tie-back @ 11388'. 4-1/2" HES 'X' SSSVLN @ 2087'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
OiFBbl
Representative Daily Average Production or Iniection Data
Gas-Mcr Water-Bbl
Casing Pressure Tubing Pressure
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations __
16. Status of well classification as:
Oil __X Gas __ Suspended __
Service
17. I hereby certify that the foregoing is tru,,e and correct to the best of my knowledge.
,~~,~/~/,~¢_..~~ Title: Technical Assistant
DeWayne R. Schnorr
Date June 29 2001
Prepared by DeWayne R. Schnorr 564-5174___
Form 10-404 Rev 06/15t88 ·
GIlt, AL
SUBMIT IN DUPLICATE
X-19B
Description of Work Completed
NRWO OPERATIONS
02/17/2001
04/20/2001
05/15/2001
05/16/2001
05/17/2001
05/18/2OO 1
MISC-CAP SUST.: DRIFT TUBING (MISC CAP SUST)
MISC-CAP SUST.: TIFL PRE ACID
ACID: ACID STIMULATION
ACID: STRADDLE PACKER ACID STIMULATION
ACID: STRADDLE PACKER ACID TREATMENT
ACID: STRADDLE PACKER ACID TREATMENT
SUMMARY
02/17/01 DRIFTED TUBING TO 11506' SLM - STOPPED BY DEVIATION WELL POP
BY OPERATOR.
04/20/01 TIFL FAILED (PRE ACID). IA FL ROSE FROM 11026' TO 6850' IN 3 HRS.
TIFL FAILED; BLED IA FROM 1300 PSI TO 720 PSI IN 3 HRS. IA FL STARTED AT
11026'AND ROSE TO 6580' IN 3 HRS. MONITORED IA FOR 1 HR AFTER TIFL, IA
PRESSURE ROSE TO 780 PSI.
05/15/01 RU DS CTU #8. PERFORM WEEKLY BOPE TEST. SI GAS LIFT AND LET
WELL DIE. LOAD IA W/199 BBLS KCL. KILL WELL, WHICH DIED IMMEDIATELY,
WITH 200 BBLS KCL WATER. RIH W/VENTURI ....
05/16/01 TAGGED UP AT 11366, THE LINER PACKER, AND TRIED TO VENTURI
AND GET DOWN, UNABLE SO PULLED OUT OF HOLE. RECOVERED SAMPLE OF
ACID INSOLUABLE MATERIAL. BLED IA DOWN FROM 1000 TO 300. RIH W/
VENTURI AND FISHING MOTOR AND VENTURI OVER THE INTERVAL 11300-13000.
PASSED THROUGH PACKER/TAILPIPE. RIH TO 13000'. POH. RIH WITH TEL AND
2.5" NOZZLE. LOCATE NIPPLES, CORRECT DEPTH (+5'), AND FLAG PIPE AT
11,450' (TEL). POH. MU WEATHERFORD TREATMENT PACKER ASSY. LOAD WELL
WITH 181 BBLS FILTERED 2% KCL WATER. LOAD WELL WITH 140 BBLS DEAD
CRUDE; CONTINUE TO BLEED IA. RIH W/WEATHERFORD 20' PACKER
ASSEMBLY. TIE INTO FLAG; CORRECT DEPTH TO TOP ELEMENT. LOAD
ANOTHER 105 BBLS OF DEAD CRUDE IN ATTEMPT TO GET SOME WHP BUT TO
NO AVAIL. PERFORM RATE TEST AT 1.5 BPM AT 2610 CTP AND 0 WHP; 0.6 BPM
AT 450 CTP AND 0 WHP.
05/17/01 DROP BALL AND TEST PACKER IN BLANK PIPE. PACKER TESTED
GOOD. BLED IA FROM 320 DOWN TO 30. RIH TO SETTING DEPTH 11520 CTMD
AND TREAT WITH 32 BBLS NH4CL, 22 HCL, 11 MUD ACID, 46 NH4CL, 11 CLAY
ACID. RIH TO SETTING DEPTH 11710 CTMD AND TREAT WITH 33 BBLS NH4CL, 23
HCL, 11 MUD ACID, 46 NH4CL, 11 CLAY ACID. RIH TO SETTING DEPTH 11920
CTMD AND TREAT WITH 33 BBLS NH4CL, 23 HCL, 11 MUD ACID, 46 NH4CL, 11
CLAY ACID. Rill TO SETTING DEPTH 12060 CTMD AND TREAT WITH 33 BBLS
NH4CL, 23 HCL, 12 MUD ACID, 46 NH4CL, 12 CLAY ACID. RIH TO SETTING DEPTH
12260 CTMD AND TREAT WITH 33 BBLS NH4CL, 23 HCL, 12 MUD ACID, 46 NH4CL,
12 CLAY ACID. RIH TO SETTING DEPTH 12440 CTMD AND TREAT WITH 33 BBLS
NH4CL, 23 HCL, 12 MUD ACID, 46 NH4CL, 12 CLAY ACID. RIH TO SETTING DEPTH
12730 CTMD AND TREAT WITH 33 BBLS NH4CL, 23 HCL, 12 MUD ACID, 46 NH4CL,
12 CLAY ACID. RIH TO SETTING DEPTH 12790 CTMD AND TREAT WITH 33 BBLS
NH4CL, 23 HCL, 12 MUD ACID, 46 NH4CL, 12 CLAY ACID. RIH AND SET DOWN AT
12827, EASED THROUGH, SET DOWN AT 12855, COULD NOT GET THROUGH.
CALL BARTEL, CHANGE PROGRAM TO TREAT 12510-12530. PUH TO SETTING
DEPTH 12510 CTMD AND TREAT WITH 33 BBLS NH4CL, 38 HCL, 24 MUD ACID, 46
NH4CL, 18 CLAY ACID. PU TO BLANK PIPE AT 11450 AND TEST. FAILED BLANK
PIPE TEST. POOH. FIND BAD PIPE AT 7456. DECIDE TO SCRAP PIPE.
05/18/01 AT SURFACE, TOOLS LOOK GOOD WITH A LITTLE WEAR ON TOP
ELEMENT. MU NOZZLE, STABBED ON WELL AND BLEW COIL DRY WITH
NITROGEN. TURN WELL OVER TO FLOWBACK THROUGH APC TESTERS. RDMO.
FLUIDS PUMPED
!
BBLS. DESCRIPTION
1 DIESEL FOR SURFACE PRESSURE TEST
426 2% KCL WATER W/FRICTION REDUCER
702 2% KCL WATER
245 DEAD CRUDE
221 12% HCL ACID
117 9-1 MUD ACID
743 3% NH4CL
117 1/2 STRENGTH CLAY ACID
109 METHANOL
2681 TOTAL
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
FROM'
Julie Heusser,
Commissioner
Tom Maunder' /--j-~ ~r~~
P. I. Supervisor
Jeff Jones,
Petroleum InSpector
DATE:
SUBJECT:
December 9, 2000
Safety Valve Tests
Prudhoe Bay Field
BPX / X-Pad
.
SatUrday, DeCember 9, 2000: I traveled to BPX's X Pad in the Prudhoe Bay
Field to witness Safety Valve System tests.
Merv Liddelow, BPX representative in charge of the testing, performed the tests
in a safe and proficient manner. Of the 26 wells tested, 3 failures were
witnessed. Well X-14A's SSV failed to close and well X-19B's pilot was frozen
and the SSV failed to close. Mr. LiddelOw indicated to me on 12/10/00 that these
items have been corrected and successfully re-tested. The AOGCC test reports
are attached for reference.
I conducted 26 Well house inspections concurrent with the SVS tests. A slight
crude °il leak was noted on a wellhead flange of well X-19B. Mr. Liddelow
indicated he would have this item addressed. No other exceptions were noted.
SUMMARY: I witnessed SVS tests and conducted well house inspections on
BPX's X Pad.
26 wells, 53 components teSted, 3 failures. 26 well houses inspected.
Attachments: SVS PBU X Pad 12-9-00 JJ
NON-CONFIDENTIAL
SVS PBU X Pad 12-9-00 JJ.doc
AlaSka Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Merv Liddelow
AOGCC Rep: Jeff Jones
Submitted By: Jeff Jones
Field/Unit/Pad: PBF/PBU/X Pad
Separator psi: LPS 174
Date: 12/9/00
HPS 723
Well Permit Separ Set L/P Test Test Test Date
Oil, WAG, GIN J,
Number Number PSI PSI i Trip Code Code Code Passed GAS or CYCLE
X-'01 1790540 174 125! 125! P P OIL
X-02 1790690 174 125 1251 P P OIL
X-03A 1980860 723 550 400 P P OIL
,
X-04 1790890 174 125 125 P P OIL
X-05 1791040 174 · 125 115 p p OIL
, ,
X-06 1800090
X-07 1800130' 174 125 110 P P OIL
X-08 1800360 174 125 115 P P OIL
X-09 1800280
X-10 1800430 174 125 120 'P P OIL
,
X-11A 1990780 2000 1950 P P P WAG
X-12 1800440 174 125 110 P P OIL
X-13A 1930650 174 125 100 P P OIL
X-14A 1921430 174 125 120 P 5 OIL
X-15 1800740 174 125 125! P P OIL
.
,
X-16 1811720! 174 125 125 P P OIL
X-17 1811690 723 550 520 P P OIL
X-18 1811620 174 125 120 P P OIL
X~19B 1961300 174 125 0 ' 2 '5 OIL
X-20 1940670
X-21A 1991080 174 125 110 ' P P oil
x-22 1931300 174 125 110 P P OIL
X-23 1840610
X-24A 1991250
X-25 1840340 174 125 120! P' P OIL
'X-26 1840300
X-27 1840690 174 125 120 P P OIL
~-28 1'931140
,
X-29 1931390
X-30 1950410 174 125 115 P P OIL
X-31 1931980 174 125 120 P P OIL
X-32 1931620 174 12~ 125 P P OIL
X-34 1931720 174 125 115 P P OIL
X-35 1931990 174 ,12~ 90 P P OIL
Page 1 of 2 SVS PBU X Pad 12-9-00 JJ.xls
Well permit Separ Set L/P Test Test Test Date
Oil, WAG, GINJ,
Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE
X-36 1961670~
Wells: 53 Failures: 3 Failure Rate: 5.6% [219o var
26 Components:
Remarks:
12/13/00
Page 2 of 2
SVS PBU X Pad 12-9-00 JJ.xls
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
JANUARY 03, 2 001.
M
p i
A T
E
E IA L U N L~
W
T H
IS M ARK E
R
C:Lo~ILM.DOC
PERMIT
DATA
AOGCC Individual Well
Geological Materials Inventory
T DATA PLUS
Page: 1
Date: 08/12/98
RUN RECVD
T
96 - 130 POL/CCL/GR- SET
96-130 BP RCD
~/11260-11384
~/10960-11462
1 09/~8/96
FINAL 10/25/96
96-130 BP RCD
96-130 PROD PROF
~/10960-11300 PB1
~/1190-11415
FINAL 10/25/96
FINAL 01/17/97
96-130 8026
C~3,10-12 SPERRY GR/EWR4/ROP
07/23/97
96-130 8027
96 - 130 NGP / EWR4 - MD
96 - 130 NGP/EWR4 -MD
96 - 130 NGP / EWR4 - TVD
c~SPERRY GR/EWR4/ROP
~/7891-11880. PB1
~7~45-9080 'f~
PB1
3 07/23/97
FINAL 07/30/97
FINAL 07/30/97
FINAL 07/30/97
96-130
NGP/EWR4-TVD ~ 7145-8967
10-407
~OMPLETION DATE /O/ ~ / ~/
DAILY WELL OPS R ~/}~ / ~ / TO Ih/~ /~[~ /
Are dry ditch'sam~les recfumred? yes received?
FINAL 07/30/97
~F./ (~/7~/
)k/ (~/~$ /
yes no -
Was the well cored? yes ~~nalysis & description received? yes no
Are well tests required?, ~yes
Well is in compliance ~
Inftial
COMMENTS
Received?
WELL LOG TRANSMITTAL
To: State of Alaska . July 30, 1997
Alaska Oil and Gas Conservation Comm.
Attn.: Loft Taylor
3001 Porcupine Drive
Anchorage, Alaska 99501 (~ [CO ×
RE: MWD Formation Evaluation Logs - X-19B, X-19B PB1 & X-19B L1,
AK-MW-60107
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this of this transmittal letter to the attention off
Yma Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
X-19B:
2" x 5" MD Gamma Ray Logs:
50-029-20676-02
2"x 5" TVD Gamma Ray Logs:
50-029-20676-02
X-19B PBI:
2"x 5"MD Gamma Ray Logs:
50-029-20676-70
2"x 5" TVD Gamma Ray Logs:
50-029-20676-70
X-19B LI:
2" x 5" _MD Gamma Ray Logs:
50-029-20676-60
2" x 5" TVD Gamma Ray Logs:
50-029-20676-60
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
JUl ,} 0 1aa,'
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
_
OlR I I--I--I ~ G SEIR~/I 1-- E S
WELL LOG TRANSMITTAL
To:
State of Alaska July 23, 1997
Alaska Oil and Gas Conservation Comm.
Attni: Loft Taylor
3001 Porcupine Dr.
AnchOrage, Alaska 99501 q
~MWD Formation Evaluation Logs - X- 19B, X- 19B PB 1, AK-MW-60107
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention off
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
2 LDWG formatted Discs with verification listings.
API#: 50-029-20676-02, 50-029-20676-70.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, inc. Company
_
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 10704
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
1/16/97
Well Job # Log Description Date BL RF Sepia LIS Tape
A-43 LEAK DETECTION 961 221 1 1
B- 19 PRODUCTION PROFILE 9 61 2 2 3 1 1
C-29 ORIENTED WHIPSTOCK 9 61 2 0 3 1 1
D- 1 LEAK DETECTION 9 61 2 0 4 1 1
D- 3 LEAK DETECTION 9 61 21 4 I 1
D-23 BAKER WHIPSTOCK 9 61 2 0 4 1 1
GC-3D INJECTION PROFILE 9 61 21 9 I 1
H- 08 PRODUCTION PROFILE 9 61 2 2 4 I 1
' H- 15 PERFORATING RECORD 9 61 2 21 I 1
H- 25 PERFORATING RECORD 9 61 2 21 I 1
J-03 PERFORATING RECORD 9 61 2 2 6 I 1
, M-4 PRODUCTION PROFILE 961 21 5 I 1
N-20 GAMMA RAY/CCL 961 21 7 I 1
N-21 JET CUTi'ER RECORD 961 228 1 1
R-18A PRODUCTION PROFILE W/DEFT 961 205 1 1
S- 16 PERFORATING RECORD 961 220 I 1
S- 33 PRODUCTION LOG 961 227 I 1
X-19B MULTI-LATERAL PRODUCTION PROFILE 961 20 9 I 1
Y-01 CHEMICAL CUTTER 961 223 I 1
Z-20 (21-20-11-12) TEMPERATURE LOG 961 21 3 I I
'1'6' o5 5
7 7 '
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
STATE OF ALASKA
ALASK~ ,JIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 96-130
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20676-02
4. Location of well at surface '~~~.~ 9. Unit or Lease Name
356' NSL, 137' EWL, SEC. 05, T10N, R14E ?-,;:.: ..... ~;~"~ Prudhoe Bay Unit
Atto,p, of productiv,e interval !¢ ~';;-;;;'.:;.:': ':': ; 'l[_"~! 10. Well Number
4638 SNL, 2296 WEL, SEC. 07, T10N, R14E..~--,-,,,.-,~';~/-~' ~/~-"'* ; I~ X-19B
At total depth ~;' '/-'~,~¢'/.--;~-~;k ~i I[~i~ 11 Field and Pool
' ' 1 T1 N R14E '"' ~" :~'~:~:'" : '~'~"--~ '
1424 SNL, 3824 WEL, SEC. 8, 0 , i ~; ....
Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease-D'e'§i§nAtio_n~and Serial No. Pool
KBE = 68.23' I ADL 047475
12. Date Spudded08/19/96 I13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if OffshOre I 16' NO' Of cOmpletiOns09/10/96 10/06/96 N/A MSLI One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Survey 20. Depth where SSSV set~l. Thickness of Permafrosl
14085 9081 FT 13988 9062 FTI [] Yes [] No (Nipple) 2087' MD ! 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, LWD, GR, RES, DIP, CCL
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulated Conductor Surface 110' 36" 8 cu yds concrete
13-3/8" 72# L-80 Surface 2703' 17-1/2" 3906 cuft Arctic Set II
9-5/8" 47# L-80 Surface 7413' 12-1/4" 1300 cuft Class 'G', 130 cuft Arctic Set I
7" 26# L-80 7211' 11428' 8-1/2" 460 cuft Class 'G'
4-1/2" 12.6# L-80 11402' 14076' 6" 387 cuft Class 'G'
24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD
and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-3/4" Gun Diameter, 4spf 4-1/2", 12.6#, L-80 11375' - 11393' 11369'
MD TVD MD TVD 4-1/2", 12.6#, L-80 11233' 11186'
11510'- 13870' 8995'- 9039' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
Freeze Protect with 150 Bbls of Diesel
DEC 0 ~
~aska Oil & Gas Cons. CoJ
A~chorc~.o
27. I~RODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
October 18, 1996 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAViTY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
Alaska 0ii & Gas Cons. Commiss[0-~
Form 10-407 Rev. 07-01-80
Submit In Duplicate
29. Geologic Markel 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name Depth Depth and gravity, GOR, and time of each phase.
Shublik C 11428' 8961'
Top of Sadlerochit 11508' 8995'
HOT 13900' 9044'
OWC 14016' 9067'
31. List of Attachments
Summary of Daily Dril~ng Reports, Surveys
32. I hereby certify that ~rhc/for/~,g~nef i~/ ~/" d correct to the best of my knowledge ~ '~-I~le~,
Signed ~~~- ~ ~-'-""---' ~ "~'" i I~'
PaulPdnce Title Senior Drilling Engineer Date~ -~
Prepared By Name/Number: Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
SUMMARY OF DAILY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
Well Name: X-19B & BL1 Rig Name: Nabors 18E AFE: 4P0843
Accept Date: 08/1 5/96 Spud Date: 08/1 9/96 Release Date: 1 0/06/96
Aug 15 1996 (1)
Held safety meeting. Rig moved 100 %. Rig waited: Assessed situation. Rigged up
Drillfloor / Derrick.
Aug 16 1996 (2)
Rigged up Drillfloor/Derrick. Installed Wellhead primary components. Removed
Hanger plug. Held safety meeting. Circulated at 7673 ft. Installed Hanger plug.
Removed Xmas tree primary components. Rigged up BOP stack. Tested BOP stack.
Aug 17 1996 (3)
Tested BOP stack. Repaired BOP stack. Tested BOP stack, i:)q~rc~E.~~~er plug.
Pulled Tubing on retrieval string to 7673 ft. Circulated at 7673~. q_~dl-doVv~3800 ft.of
Tubing.
rD EC 0 G 1996
Aug 18 1996 (4 )
Alaska 0il & 6as Cons. O0mmissi0n
Laid down 7673 ft of Tubing. Conduct braided cable operations ~~g§ize cable.
Tested Casing. Rigged up Tubing handling equipment. Rigged up Top ram. Tested
Top ram. Installed Bore protector. Made up BHA no. 1 . Tested Kelly cocks. R.I.H.
to 7000 ft.
Aug 19 1996 (5)
R.I.H. to 7405 ft. Circulated at 7405 ft. Set tool face. Milled Casing at 7413 ft.
Repaired Rotary table. Pulled out of hole to 760 ft. Pulled BHA. Rigged down Rotary
table. R.I.H. to 1500 ft.
Aug 20 1996 (6)
R.I.H. to 7400 ft. Washed to 7417 ft. Cut Casing at 7453 ft. Circulated at 7453 ft.
Pulled out of hole to 725 ft. Pulled BHA. Made up BHA no. 3. Removed Bore
protector. R.i.H. to 665 ft. Washed to 7453 ft.
Aug 21 1996 (7)
Drilled to 7981 ft. Circulated at 7981 ft. Pulled out of hole to 660 ft. Pulled BHA.
Made up BHA no. 4.
Operations Summary for: X ; & X-19BL1
Aug 22 1996 (8)
Made up BHA no. 4. R.I.H. to 7922 ft. Drilled to 7995 ft. Serviced Mud shakers.
Drilled to 8986 ft. Circulated at 8986 ft. Drilled to 9140 ft.
Aug 23 1996 (9)
Drilled to 10475 ft. Pulled out of hole to 9000 ft. Drilled to 10702 ft.
Drilled to 11365 ft. Serviced Mud pump power end. Drilled to 11430 ft.
Aug 25 1996 (11)
Drilled to 11880 ft. Circulated at 11880 ft. Pulled out of hole to /,+~,~ ~[. ~rc-u~a[eu-a[
11880 ft. Pulled out of hole to 7200 ft. Circulated at 11880 ft. Pulled out of hole to
7000 ft.
Aug 26 1996 (12)
Pulled out of hole to 254 ft. Downloaded MWD tool. Pulled BHA. Ran electric logs.
Ran electric logs. Ran electric logs. Rigged up sub-surface equipment - Formation
logs. Rig waited :Orders. Ran electric logs. Repaired Brake. Serviced Block line.
Ran electric logs. Rigged up sub-surface equipment - Formation logs. Ran electric
logs.
Aug 27 1996 (13)
Ran electric logs. Rigged down Logging/braided cable equipment. Rigged up
Internal BOPs. Ran Casing to 4000 ft (7 in OD). Rigged up Drillstring handling
equipment. Ran Casing on landing string to 7200 ft. Circulated at 7200 ft. Ran
Drillpipe on landing string to 8648 ft. Washed to 8677 ft. Ran Drillpipe on landing
string to 11050 ft. Circulated at 11050 ft.
Aug 28 1996 (14)
Ran Casing on landing string to 11548 ft. Washed to 11880 ft. Circulated at 11880
ft. Mixed and pumped slurry - 82 bbl. Displaced slurry - 287 bbl. Set packer at 7211 ft
with 4200 psi. Circulated at 7211 ft. Pulled out of hole to 0 ft. Laid down 4929 ft of
Drillpipe.
Aug 29 1996 (15)
Laid down 4929 ft of Drilipipe. Rigged up Top ram. Repaired Annular preventor.
Tested BOP stack. Made up BHA no. 1 . Singled in drill pipe to 4481 ft. R.I.H. to
11320 ft. Drilled cement to 11464 ft. Tested Casing - Via annulus.
Page 2
Operations Summary for: X ; & X-19BL1
Aug 30 1996 (1)
Circulated at 11475 ft. Drilled to 11500 ft. Laid down 2511 ft of 5 in OD drill pipe.
Pulled out of hole to 4481 ft. Pulled BHA. Installed Wear bushing. Made up BHA no.
2 . Singled in drill pipe to 7007 ft. R.I.H. to 11475 ft. Circulated at 11475 ft. Logged
hole with LWD: Directional (DIR)
from 11375 ft to 11400 ft.
Aug 31 1996 (2)
Drilled to 11500 ft. Pulled out of hole to 207 ft. Pulled BHA. Made up BHA no. 3.
R.I.H. to 11494 ft. Washed to 11500 ft. Drilled to 11500 ft. Pulled out of hole to 5000 ft.
Sep I 1996(3 )
Pulled out of hole to 207 ft. Pulled BHA. Serviced Block line. Rig waited: Equipment.
Made up BHA no. 4. R.I.H. to 11488 ft. Fished at 11491 ft. Pulled out of hole to 0 ft.
Laid down fish. Made up BHA no. 4. R.I.H. to 3000 ft.
Sep 2 1996 (4)
R.I.H. to 11491 ft. Fished at 11492 ft. Pulled out of hole to 0 ft. Pulled BHA. Rigged up
Logging/braided cable equipment. Ran electric logs. Repaired Logging/braided
cable equipment. Ran electric logs. Ran Drillpipe in stands to 1000 ft.
Sep 3 1996 (5)
Ran Drillpipe in stands to 11300 ft. Washed to 11475 ft. Circulated at 11475 ft.
Pulled out of hole to 0 ft. Rigged up Wireline units. Repaired Wireline units. Ran
electric logs. Set downhole equipment (wireline).
-.
Sep 4 1996 (6)
Rigged down Wireline units. Made up BHA no; 5. R.I.H. to 11448 ft. Set tool face.
Milled Casing at 11428 ft. Circulated at 11457 ft. Pulled out of hole to 387 ft. Pulled
BHA. Retrieved Wear bushing·
Sep 5 1996 (7)
Tested BOP stack. Made up BHA no. 6 . Serviced Block line. R.I.H. to 11411 ft.
Took MWD survey at 11411 ft. Drilled to 11592 ft.
Sep 6 1996 (8)
Circulated at 11592 ft. Pulled out of hole to 240 ft. Pulled BHA. Made up BHA no. 7
· R.I.H. to 11411 ft. Drilled to 11746 ft. Pulled out of hole to 240 ft. Pulled BHA. Made
up BHA no. 8.
Page 3
Operations Summary for: X.
& X-19BL1
Sep 7 1996 (9)
Made up BHA no. 8. R.I.H. to 11500 ft. Logged hole with LWD: DIR/FE from 11433 ft
to 11669 ft. Drilled to 12500 ft.
Sep 8 1996 (10)
Drilled to 12759 ft. Circulated at 12759 ft. Pulled out of hole to 225 ft. Pulled BHA.
Made up BHA no. 9. R.I.H. to 12750 ft. Drilled to 13160 ft.
Sep 9 1996 (11)
Drilled to 13776 ft. Circulated at 13776 ft. Pulled out of hole to 225 ft. Pulled BHA.
Made up BHA no. 10.
Sep 10 1996 (12)
Made up BHA no. 10. R.I.H. to 7000 ft. Pulled out of hole to 100 ft. Pulled BHA.
R.I.H. to 11467 ft. Logged hole with LWD: DIR/FE from 11467 ft to 13700 ft. Drilled to
13894 ft.
Sep 11 1996 (13)
Drilled to 14085 ft. Circulated at 14085 ft. Pulled out of hole to 11400 ft. R.I.H. to
13776 ft. Logged hole with LWD: Formation evaluation (FE) from 13768 ft to 14085 ft.
Circulated at 14085 ft. Pulled out of hole to 225 ft. Pulled BHA. Ran Casing to 2687 ft
(4.5 in OD).
Sep 12 1996 (14)
Ran Casing to 2687 ft (4.5 in OD). Ran Casing on landing string to 14085 ft.
Circulated at 14085 ft. Mixed and pumped slurry - 69 bbl. Circulated at 11388 ft. Laid
down 2500 ft of Drillpipe. Circulated at 7000 ft. Pulled Drillpipe in stands to 7000 ft.
Sep 13 1996 (15)
Pulled Drillpipe in stands to 0 ft. Retrieved Bore protector. Tested BOP stack.
Repaired Top ram. Made up BHA no. 11. Tested BOP stack. R.I.H. to 7100 ft. Held
drill (Kick (well kill)). R.I.H. to 11607 ft. Washed to 11705 ft. R.I.H. to 13896 ft.
Washed to 13992 ft. Tested Casing. Circulated at 13992 ft. Held safety meeting.
Circulated at 13992 ft.
Sep 14 1996 (16)
Circulated at 13992 ft. Pulled out of hole to 9360 ft. Serviced Block line. Pulled out
of hole to 125 ft. Pulled BHA. Ran Drillpipe to 12070 ft (5 in OD). Rigged up sub-
surface equipment - Downhole tools. Ran Drillpipe in stands to 13930 ft.
Page 4
Operations Summary for: ×
~ & X-19BL1
Sep 15 1996 (17)
Ran Drillpipe to 13930 ft (5 in OD). Pulled out of hole to 2377 ft. Ran Drillpipe to
12070 ft (5 in OD). Tested Downhole tools - Via annulus. Ran Drillpipe to 13930 ft (5
in OD). Perforated from 11510 ft to 13870 ft. Reverse circulated at 11093 ft.
Circulated at 11093 ft. Flow check. Pulled Drillpipe in stands to 2400 ft. Laid down
800 ft of Tubing.
Sep 16 1996 (18)
Laid down 2377 ft of Tubing. Conduct braided cable operations - 5/16 size cable. Set
downhole equipment (wireline). Made up BHA no. 12. R.I.H. to 11356 ft. Circulated
at 11356 ft. Set tool face. Circulated at 11353 ft. Milled Tubular strings at 11354 ft.
Sep 17 1996 (19)
Milled Tubular strings at 11354 ft. Circulated at 11 ft. Pulled out of hole to 2000 ft.
Laid down 2000 ft of 3.5 in OD drill pipe. Serviced Well control. Made up BHA no. 1 .
R.I.H. to 11380 ft. Drilled to 11383 ft.
Sep 18 1996 (2)
Drilled to 11398 ft. Pulled out of hole to 200 ft. Pulled BHA. Made up BHA no. 1 .
R.I.H. to 11398 ft. Drilled to 11500 ft. Pulled out of hole to 4000 ft.
Sep 19 1996 (3)
Pulled out of hole to 0 ft. Made up BHA no. 2. R.I.H. to 1200 ft. R.I.H. to 11354 ft.
Set tool face. R.I.H. to 11537 ft. Drilled to 11785 ft.
Sep 20 1996 (4)
Drilled to 11870 ft. Circulated at 11870 ft. Drilled to 11954 ft. Circulated at 11954 ft.
Drilled to 12022 ft. Circulated at 12022 ft. Pulled out of hole to 11423 ft. R.I.H. to
12022 ft. Circulated at 12022 ft.
Sep 21 1996 (5)
Circulated at 12022 ft. Pulled out of hole to 120 ft. Pulled BHA. Serviced Drillfloor /
Derrick. Made up BHA no. 3. R.I.H. to 6075 ft. Serviced Block line. R.I.H. to 11388 ft.
Cimulated at 11388 ft. Tested BOP stack. R.I.H. to 12022 ft. Circulated at 12022 ft.
Sep 22 1996 (6)
Drilled to 12434 ft. Circulated at 12434 ft. Pulled out of hole to 11400 ft. R.I.H. to
12434 ft. Circulated at 12434 ft.
Page 5
Operations Summary for: X.
& X-19BL1
Sep 23 1996 (7)
Pulled out of hole to 110 ft. Pulled BHA. Made up BHA no. 4 . Functioned downhole
tools at 110 ft. R.I.H. to 11876 ft. Functioned downhole tools at 11876 ft. R,I.H. to
12434 ft. Drilled to 12693 ft. Circulated at 12693 ft. Pulled out of hole to 11400 ft.
R.I.H. to 12693 ft. Held safety meeting.
Sep 24 1996 (8)
Circulated at 12693 ft. Pumped out of hole to 11364 ft. R.I.H. to 12693 ft. Circulated
at 12693 ft.
Sep 25 1996 (9)
Pulled out of hole to 11375 ft. Cimulated at 11375 ft. Circulated at 11375 ft. Flow
check. Circulated at 11375 ft. Flow check. Circulated at 11375 ft.
Sep 26 1996 (10)
Circulated at 11375 ft. R.I.H. to 12693 ft. Circulated at 12693 ft. Drilled to 13138 ft.
Circulated at 13138 ft. Pulled out of hole to 11350 ft. Flow check. R.I.H. to 13138 ft.
Sep 27 1996 (11)
Circulated at 13138 ft. Pulled out of hole to 11375 ft. Circulated at 11375 ft. Pulled
out of hole to 6082 ft. Pulled BHA. Serviced Drillfloor / Derrick. Installed Wear
bushing. Held safety meeting. Rigged up sub-surface equipment- Formation logs.
Ran electric logs. Set downhole equipment (wireline).
Sep 28 1996 (12)
Set downhole equipment (wireline). Ran electric logs. Repaired Production logging
tools. Ran electric logs. Rigged down sub-surface equipment - Drillpipe. Retrieved
Wear bushing. Tested BOP stack.
Sep 29 1996 (13)
Tested BOP stack. Rigged up sub-surface equipment - Formation logs. Rigged up
sub-surface equipment - Drillpipe. Rigged up sub-surface equipment - Cable head.
Ran electric logs. Rigged down sub-surface equipment- Cable head. Circulated at
11180 ft. Pulled Drillpipe in stands to 5000 ft.
Sep 30 1996 (14)
Pulled Drillpipe in stands to 0 ft. Rigged down sub-surface equipment - Formation
logs. Installed Wear bushing. Made up BHA no. 6. R.I.H. to 4500 ft. Serviced Block
line. R.I.H. to 12750 ft. Reamed to 12700 ft. Pulled out of hole to 11380 ft. Took
MWD survey at 11380 ft. Pulled out of hole to 7000 ft.
Page 6
Operations Summary for: X
& X-19BL1
Oct I 1996 (15)
Pulled out of hole to 237 ft. Pulled BHA. Made up BHA no. 7 . R.I.H. to 12825 ft.
Reamed to 12897 ft. Laid down 93 ft of 5 in OD drill pipe. Circulated at 12700 ft.
Pulled out of hole to 11365 ft. R.I.H. to 12700ft. Circulated at 12700 ft. Laid down
1426 ft of 5 in OD drill pipe. Pulled out of hole to 9000 ft.
Oct 2 1996 (16)
Pulled out of hole to 211 ft. Pulled BHA. Rigged up Casing handling equipment.
Held safety meeting. Ran Casing to 1337 ft (4.5 in OD). Ran Casing on landing
string to 12700 ft. Set Rotating Liner hanger at 11377 ft with 0 psi. Circulated at
12670 ft. Pulled Drillpipe in stands to 11350 ft. Circulated at 11350 ft. Pulled Drillpipe
in stands to 3000 ft.
Oct 3 1996 (17)
Pulled Drillpipe in stands to 3000 ft. Made up BHA no. 8 . R.I.H. to 11268 ft.
Logged hole with LWD: DIR/FE from 11250 ft to 11280 ft. Circulated at 11360 ft.
Circulated at 11340 ft. Investigated pressure change. Investigated pressure
change. Circulated at 11340 ft. Pulled out of hole to 9500 ft.
Oct 4 1996 (18)
Pulled out of hole to 9500 ft. R.I.H. to 11340 ft. Flow check. Circulated at 11354 ft.
Rig waited: Equipment. Worked stuck pipe at 11354 ft. Singled in drill pipe to 11354
ft. Rig waited: Orders. Worked stuck pipe at 11354 ft. Flow check. Pulled out of
hole to 1000 ft. Pulled BHA.
Oct 5 1996 (19)
Pulled BHA. Conducted slickline operations on Slickline equipment - Tool run. Set
downhole equipment (wireline). Conducted slickline operations on Slickline
equipment- Setting run. Ran Drillpipe in stands to 1000 ft. Serviced Block line.
Ran Drillpipe in stands to 11200 ft. Circulated at 11200 ft. Laid down 11200 ft of
Drillpipe. Tested Top ram. Rigged up Completion string handling equipment. Ran
Tubing to 100 ft (4.5 in OD).
Oct 6 1996 (20)
Ran Tubing to 9133 ft (4.5 in OD). Rigged up sub-surface equipment - SCSSSV
nipple assembly. Ran Tubing to 11232 ft (4.5 in OD). Installed Tubing hanger.
Circulated at 11232 ft. Set Permanent packer at 11186 ft with 4000 psi. Retrieved
Tubing landing string. Rigged down BOP stack. Repaired BOP stack. Rigged down
BOP stack. Installed Xmas tree primary components.
Oct 7 1996 (21)
Removed Hanger plug. Tested Permanent packer. Freeze protect well - 150 bbl of
Diesel.
Page 7
S~--2RY-SUN DRILLING SERVICES PAGE 1
SHARED SERVICES DRILLING
PBU/X-19BPB1
500292067670
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 090196
MWD SURVEY
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
7399.85 6711.97 6643.74
7429.00 6738.41 6670.18
7577.62 6867.27 6799.04
7605.83 6890.19 6821.96
7638.68 6916.41 6848.18
25
24
35
36
37
4
45
1
20
45
S 52.10 W .00 1712.23S 2023.90W
S 52.07 W 1.10 1719.77S 2033.59W
S 37.00 W 8.51 1773.17S 2083.99W
S 32.70 W 10.06 1786.67S 2093.38W
S 28.20 W 9.29 1803.73S 2103.40W
2577.25
2589.06
2661.92
2678.36
2698.04
7669.22 6940.29 6872.06
7700.38 6964.01 6895.78
7732.30 6987.52 6919.29
7763.04 7009.37 6941.14
7794.26 7030.93 6962.70
39 24
41 26
43 42
45 43
46 56
S 25.00 W 8.48 1820.76S 2111.91W
S 22.00 W 9.04 1839.29S 2119.96W
S 18.50 W 10.27 1859.54S 2127.41W
S 14.40 W 11.43 1880.28S 2133.52W
S 11.00 W 8.79 1902.31S 2138.48W
2716.81
2736.51
2757.26
2777.60
2798.29
7825.16 7051.75 6983.52
7856.63 7072.38 7004.15
7886.06 7090.88 7022.65
7916.23 7108.90 7040.67
7982.10 7145.03 7076.80
48 19
49 43
52 24
54 14
59 14
S 9.70 W 5.44 1924.76S 2142.58W
S 6.90 W 8.07 1948.26S 2146.00W
S 3.40 W 12.95 1971.06S 2148.04W
S 2.60 W 6.46 1995.22S 2149.30W
S 2.40 E 9.89 2050.25S 2149.33W
2818.83
2839.81
2859.41
2879.64
2924.06
8044.02 7176.51 7108.28
8135.08 7222.19 7153.96
8228.69 7268.79 7200.56
8321.71 7314.77 7246.54
8410.60 7358.92 7290.69
59 38
6O 9
6O 8
60 36
59 49
S 2.50 E .66 2103.52S 2147.05W
S 2.70 E .59 2182.21S 2143.48W
S 1.70 E .93 2263.34S 2140.36W
S 2.00 E .58 2344.16S 2137.75W
S .30 W 2.42 2421.28S 2136.60W
2965.69
3027.06
3090.67
3154.33
3215.87
8508.91 7407.65 7339.42 60 45
8606.19 7455.78 7387.55 59 55
8694.28 7501.53 7433.30 57 28
8785.61 7550.30 7482.07 57 58
8879.44 7600.32 7532.09 57 35
S .60 W .99 2506.66S 2137.27W
S .40 W .87 2591.19S 2138.01W
S 1.60 W 3.01 2666.44S 2139.31W
S .20 E 1.75 2743.65S 2140.25W
S .20 W .53 2823.03S 2140.25W
3285.14
3353.78
3415.26
3478.10
3542.14
8971.22 7649.09 7580.86
9064.68 7698.07 7629.84
9161.32 7750.24 7682.01
9250.77 7800.86 7732.63
9344.24 7854.28 7786.05
58
58
56
55
55
12
35
2
0
16
S .70 W .80 2900.78S 2140.87W
S .80 W .43 2980.37S 2141.91W
S .70 W 2.63 3061.68S 2142.97W
S 1.80 W 1.54 3135.40S 2144.58W
S 1.20 W .60 3212.08S 2146.58W
3605.22
3670.05
3736.28
3796.70
3859.75
9439.22 7907.84 7839.61
9528.48 7957.37 7889.14
9621.44 8008.21 7939.98
9716.25 8059.15 7990.92
9806.03 8106.71 8038.48
56 4
56 31
57 10
57 49
58 12
S 1.40 W .85 3290.49S 2148.36W
S .90 W .69 3364.73S 2149.85W
S .90 W .70 3442.55S 2151.08W
S 1.20 W .74 3522.49S 2152.54W
S 1.20 W .43 3598.62S 2154.14W
3924.06
3984.83
4048.33
4113.69
4176.06
S ~RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/X- 19BPB1
500292067670
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 090196
MWD SURVEY
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9899.41 8155.35 8087.12
9993.75 8204.14 8135.91
10086.84 8253.73 8185.50
10178.32 8303.52 8235.29
10274.16 8355.05 8286.82
59 0 S .70 W .97 3678.32S 2155.46W
58 42 S 2.20 W 1.40 3759.03S 2157.50W
56 55 S 3.50 W 2.25 3837.70S 2161.41W
57 7 S 3.00 W .51 3914.32S 2165.76W
57 49 S 3.30 W .77 3995.00S 2170.20W
4241.13
4307.45
4373.23
4437.61
4505.33
10369.93 8405.76 8337.53
10462.20 8453.96 8385.73
10558.48 8503.58 8435.35
10654.79 8552.27 8484.04
10686.86 8568.23 8500.00
58 13 S 3.80 W .62 4076.09S 2175.23W
58 46 S 3.80 W .60 4154.59S 2180.44W
59 10 S 3.90 W .43 4236.92S 2185.98W
60 4 S 2.40 W 1.64 4319.87S 2190.54W
60 15 S 1.90 W 1.45 4347.67S 2191.59W
4573.72
4640.13
4709.82
4779.44
4802.48
10718.11 8583.86 8515.63
10750.10 8600.00 8531.77
10782.50 8616.39 8548.16
10814.74 8632.90 8564.67
10847.12 8649.60 8581.37
59 42 S 4.20 W 6.60 4374.69S 2193.02W
59 42 S 5.10 W 2.43 4402.22S 2195.26W
59 30 S 6.70 W 4.30 4430.01S 2198.14W
58 54 S 8.60 W 5.38 4457.46S 2201.82W
58 58 S 11.30 W 7.15 4484.77S 2206.61W
4825.13
4848.66
4872.78
4897.10
4921.96
10874.25 8663.62 8595.39
10905.40 8679.84 8611.61
10938.03 8697.01 8628.78
10969.82 8713.92 8645.69
11002.36 8731.43 8663.20
58 49 S 11.90 W 1.96 4507.52S 2211.28W
58 22 S 13.90 W 5.67 4533.44S 2217.22W
58 7 S 15.00 W 2.97 4560.31S 2224.14W
57 35 S 18.10 W 8.42 4586.11S 2231.81W
57 17 S 17.60 W 1.59 4612.22S 2240.21W
4943.08
4967.50
4993.26
5018.61
5044.64
11035.26 8749.27 8681.04
11067.88 8767.06 8698.83
11098.80 8783.92 8715.69
11129.41 8800.58 8732.35
11161.09 8817.81 8749.58
57 1 S 19.70 W 5.43 4638.40S 2249.05W
56 54 S 20.30 W 1.58 4664.10S 2258.40W
56 59 S 20.80 W 1.39 4688.36S 2267.50W
57 3 S 20.80 W .23 4712.37S 2276.62W
57 4 S 21.40 W 1.59 4737.18S 2286.19W
5070.98
5097.24
5122.19
5146.95
5172.62
11193.45 8835.35 8767.12
11225.97 8852.97 8784.74
11256.43 8869.47 8801.24
11287.56 8886.32 8818.09
11319.95 8903.83 8835.60
57 16 S 20.90 W 1.42 4762.54S 2296.00W
57 6 S 22.00 W 2.88 4787.98S 2306.00W
57 17 S 24.00 W 5.55 4811.54S 2316.00W
57 7 S 27.00 W 8.12 4835.15S 2327.26W
57 25 S 28.50 W 4.00 4859.27S 2339.95W
5198.88
5225.30
5250.23
5275.93
5302.88
11351.78 8920.91 8852.68
11382.15 8936.93 8868.70
11413.67 8953.27 8885.04
11445.35 8969.54 8901.31
11479.56 8986.89 8918.66
57 42 S 30.70 W 5.90 4882.62S 2353.22W
58 37 S 32.60 W 6.12 4904.58S 2366.75W
58 54 S 34.70 W 5.77 4927.01S 2381.69W
59 19 S 36.40 W 4.78 4949.13S 2397.49W
59 42 S 37.40 W 2.76 4972.70S 2415.19W
5329.56
5355.27
5382.19
5409.38
5438.85
tRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/X-19BPB1
500292067670
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 090196
MWD SURVEY
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
11511.90 9003.23 8935.00 59 37 S 37.60 W .60 4994.845 2432.18W 5466.76
11542.34 9018.49 8950.26 60 12 S 37.50 W 1.93 5015.735 2448.24W 5493.09
11574.04 9034.18 8965.95 60 27 S 37.20 W 1.16 5037.625 2464.95W 5520.63
11606.03 9049.81 8981.58 61 1 S 38.20 W 3.24 5059.705 2482.01W 5548.53
11637.73 9065.05 8996.82 61 31 S 39.50 W 3.93 5081.355 2499.45W 5576.29
11669.62 9080.16 9011.93 61 55 S 39.30 W 1.40 5103.055 2517.27W 5604.33
11701.26 9094.91 9026.68 62 29 S 39.50 W 1.86 5124.685 2535.04W 5632.28
11732.88 9109.42 9041.19 62 52 S 39.10 W 1.65 5146.425 2552.83W 5660.33
11764.69 9123.82 9055.58 63 19 S 38.80 W 1.65 5168.485 2570.67W 5688.67
11796.30 9137.88 9069.65 63 50 S 38.50 W 1.85 5190.595 2588.35W 5716.95
11880.00 9174.78 9106.55 63 50 S 38.50 W .00 5249.38S 2635.11W 5792.02
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5873.66 FEET
AT SOUTH 26 DEG. 39 MIN. WEST AT MD = 11880
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 216.22 DEG.
TIE-IN SURVEY AT 7,399.00' MD
WINDOW POINT AT 7,429.00' MD
PROJECTED SURVEY AT 11,880.00' MD
S ..... RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/X-19BPB1
500292067670
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 090196
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
7399.85 6711.97 6643.74 1712.23 S 2023.90 W
8399.85 7353.52 7285.29 2411.98 S 2136.55 W
9399.85 7885.86 7817.63 3257.84 S 2147.57 W
10399.85 8421.51 8353.28 4101.47 S 2176.91 W
11399.85 8946.14 8877.91 4917.28 S 2374.95 W
687.88
1046.33 358.45
1513.99 467.66
1978.34 464.35
2453.71 475.38
11880.00 9174.78 9106.55 5249.38 S 2635.11 W
2705.22 251.51
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
S~-~.RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/X-19BPB1
500292067670
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 090196
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
7399.85 6711.97 6643.74 1712.23 S 2023.90 W 687.88
7462.14 6768.23 6700.00 1729.10 S 2044.61 W 693.91 6.03
7578.80 6868.23 6800.00 1773.73 S 2084.40 W 710.57 16.66
7706.07 6968.23 6900.00 1842.86 S 2121.31 W 737.84 27.27
7850.22 7068.23 7000.00 1943.42 S 2145.39 W 781.99 44.15
8027.63 7168.23 7100.00 2089.39 S 2147.67 W 859.40 77.41
8227.57 7268.23 7200.00 2262.37 S 2140.39 W 959.34 99.94
8429.11 7368.23 7300.00 2437.28 S 2136.69 W 1060.88 101.54
8630.75 7468.23 7400.00 2612.36 S 2138.23 W 1162.52 101.64
8819.42 7568.23 7500.00 2772.31 S 2140.15 W 1251.19 88.67
9007.55 7668.23 7600.00 2931.65 S 2141.24 W 1339.32 88.13
9193.54 7768.23 7700.00 3088.41 S 2143.30 W 1425.31 85.99
9368.73 7868.23 7800.00 3232.20 S 2147.01 W 1500.50 75.19
9548.17 7968.23 7900.00 3381.15 S 2150.11 W 1579.94 79.44
9733.29 8068.23 8000.00 3536.91 S 2152.84 W 1665.06 85.12
9924.43 8168.23 8100.00 3699.77 S 2155.72 W 1756.20 91.14
10113.41 8268.23 8200.00 3859.93 S 2162.77 W 1845.18 88.98
10298.91 8368.23 8300.00 4015.92 S 2171.40 W 1930.68 85.50
10489.72 8468.23 8400.00 4178.08 S 2182.00 W 2021.49 90.81
10686.87 8568.23 8500.00 4347.68 S 2191.59 W 2118.64 97.14
10883.14 8668.23 8600.00 4514.95 S 2212.90 W 2214.91 96.27
11070.02 8768.23 8700.00 4665.78 S 2259.03 W 2301.79 86.88
11254.14 8868.23 8800.00 4809.78 S 2315.23 W 2385.91 84.12
11442.79 8968.23 8900.00 4947.35 S 2396.19 W 2474.56 88.65
11644.42 9068.23 9000.00 5085.89 S 2503.19 W 2576.19 101.62
11865.14 9168.23 9100.00 5238.94 S 2626.81 W 2696.91 120.72
11880.00 9174.78 9106.55 5249.38 S 2635.11 W 2705.22 8.31
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
S?~RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/X-19B
500292067602
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/
DATE OF SURVEY: 091696
MWD SURVEY
JOB NUMBER: AK-MW-60107
PAGE
1/96
KELLY BUSHING ELEV. = 68.23
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11413.68 8953.34 8885.11
11428.00 8960.72 8892.49
11444.25 8968.92 8900.68
11473.90 8982.66 8914.43
11505.50 8994.28 8926.05
58 54
59 5
60 17
64 26
72 22
S 34.70 W .00 4927.11S 2381.70W
S 36.00 W 7.88 4937.12S 2388.80W
S 36.00 W 7.45 4948.47S 2397.05W
S 38.30 W 15.59 4969.40S 2412.92W
S 39.70 W 25.40 4992.21S 2431.40W
5382.28
5394.56
5408.58
5434.84
5464.17
11536.07 9001.53 8933.30
11570.85 9004.82 8936.59
11602.32 9004.36 8936.13
11632.90 9002.85 8934.62
11661.90 9001.17 8932.94
80 10
88 56
92 42
92 58
93 39
S 41.10 W 25.93 5014.80S 2450.64W
S 39.30 W 25.74 5041.22S 2472.96W
S 37.90 W 12.75 5065.81S 2492.58W
S 37.50 W 1.58 5089.97S 2511.26W
S 36.30 W 4.75 5113.12S 2528.64W
5493.76
5528.26
5559.70
5590.23
5619.18
11715.48 8998.59 8930.36
11749.69 8998.07 8929.84
11779.70 8998.12 8929.89
11811.73 8998.27 8930.04
11843.64 8998.60 8930.37
91 50
89 54
89 52
89 35
89 11
S 36.70 W 3.46 5156.14S 2560.47W
S 36.10 W 5.94 5183.67S 2580.77W
S 35.70 W 1.34 5207.98S 2598.37W
S 35.60 W .93 5234.00S 2617.03W
S 36.00 W 1.77 5259.88S 2635.70W
5672.69
5706.89
5736.90
5768.93
5800.83
11875.05 8999.09 8930.86
11905.11 8999.68 8931.45
11936.13 9000.44 8932.21
11967.09 9001.41 8933.18
11998.22 9002.68 8934.45
89 1
88 42
88 29
87 56
87 21
S 34.40 W 5.13 5285.54S 2653.80W
S 35.30 W 3.17 5310.21S 2670.97W
S 34.60 W 2.36 5335.62S 2688.74W
S 34.10 W 2.40 5361.17S 2706.20W
S 33.20 W 3.44 5387.06S 2723.43W
5832.23
5862.28
5893.28
5924.20
5955.28
12028.39 9003.95 8935.72
12060.32 9005.00 8936.77
12090.63 9005.86 8937.63
12121.86 9006.82 8938.59
12152.12 9007.60 8939.37
87 49
88 25
88 18
88 9
88 53
S 33.30 W 1.56 5412.27S 2739.96W
S 34.50 W 4.21 5438.76S 2757.76W
S 33.50 W 3.32 5463.87S 2774.70W
S 34.10 W 1.98 5489.81S 2792.06W
S 34.70 W 3.12 5514.77S 2809.15W
5985.38
6017.26
6047.54
6078.72
6108.96
12184.54 9008.29 8940.06
12214.86 9009.10 8940.87
12245.46 9009.84 8941.61
12276.74 9010.23 8942.00
12310.36 9010.17 8941.94
88 40
88 15
88 58
89 35
90 36
S 36.70 W 6.20 5541.09S 2828.06W
S 35.70 W 3.59 5565.55S 2845.96W
S 35.50 W 2.47 5590.42S 2863.77W
S 36.50 W 3.76 5615.72S 2882.16W
S 36.60 W 3.02 5642.73S 2902.18W
6141.36
6171.67
6202.26
6233.54
6267.15
12340.22 9009.75 8941.52
12371.47 9009.24 8941.01
12401.19 9008.82 8940.59
12432.29 9008.45 8940.22
12463.61 9008.19 8939.96
9O 58
90 53
90 44
90 37
90 20
S 38.40 W 6.15
S 35.60 W 8.96
S 36.80 W 4.07
S 37.70 W 2.92
S 35.90 W 5.82
5666.41S 2920.35W 6297.00
5691.37S 2939.15W 6328.24
5715.34S 2956.70W 6357.96
5740.10S 2975.52W 6389.05
5765.17S 2994.28W 6420.36
S?=~RY-SUN DRILLING SERVICES
ANCHORAGE ALAS KA
PAGE
SHARED SERVICES DRILLING
PBU/X-19B
5oo292o676o2
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 091696
MWD SURVEY
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
12494.87 9007.94 8939.71
12526.97 9007.67 8939.44
12558.06 9007.42 8939.19
12588.29 9007.26 8939.03
12619.53 9007.27 8939.04
90 33
90 25
90 29
90 7
89 50
S 36.10 W .93 5790.46S 3012.66W
S 36.60 W 1.60 5816.31S 3031.68W
S 35.80 W 2.58 5841.40S 3050.04W
S 36.60 W 2.92 5865.79S 3067.90W
S 37.00 W 1.54 5890.81S 3086.61W
6451.62
6483.72
6514.81
6545.03
6576.27
12650.56 9007.41 8939.18
12682.39 9007.64 8939.41
12709.18 9007.93 8939.70
12743.81 9008.43 8940.20
12773.90 9008.96 8940.73
89 37
89 32
89 11
89 8
88 51
S 35.80 W 3.93 5915.78S 3105.02W
S 35.50 W .99 5941.65S 3123.57W
S 35.90 W 1.96 5963.40S 3139.20W
S 34.50 W 4.05 5991.69S 3159.16W
S 35.40 W 3.13 6016.35S 3176.40W
6607.30
6639.13
6665.92
6700.53
6730.61
12804.83 9009.68 8941.45
12836.26 9010.59 8942.36
12866.23 9011.53 8943.30
12897.53 9012.61 8944.38
12929.88 9013.72 8945.49
88 27
88 15
88 9
87 52
88 10
S 35.00 W 1.83 6041.62S 3194.22W
S 36.40 W 4.50 6067.13S 3212.55W
S 37.20 W 2.69 6091.12S 3230.50W
S 38.00 W 2.70 6115.90S 3249.58W
S 38.10 W .98 6141.36S 3269.51W
6761.53
6792.94
6822.89
6854.16
6886.48
12960.33 9014.57 8946.34
12991.66 9015.38 8947.15
13020.98 9016.23 8948.00
13051.49 9017.20 8948.97
13081.90 9018.19 8949.96
88 37
88 25
88 15
88 5
88 10
S 38.50 W 1.95 6165.25S 3288.37W
S 37.70 W 2.62 6189.89S 3307.70W
S 37.90 W .92 6213.05S 3325.66W
S 37.80 W .59 6237.13S 3344.37W
S 37.30 W 1.66 6261.23S 3362.90W
6916.90
6948.20
6977.50
7007.98
7038.36
13112.67 9019.05 8950.82
13143.06 9019.76 8951.53
13174.55 9020.52 8952.29
13202.24 9021.21 8952.98
13236.86 9021.79 8953.56
88 37
88 40
88 34
88 33
89 30
S 38.60 W 4.46 6285.48S 3381.81W
S 39.10 W 1.66 6309.14S 3400.87W
S 37.90 W 3.82 6333.77S 3420.46W
S 37.40 W 1.81 6355.69S 3437.37W
S 38.40 W 3.98 6383.00S 3458.64W
7069.10
7099.45
7130.91
7158.58
7193.18
13267.57 9021.92 8953.69
13298.18 9021.96 8953.73
13329.91 9021.93 8953.70
13361.88 9021.99 8953.75
13392.09 9022.24 8954.01
90 0
89 50
90 16
89 30
89 30
S 39.20 W 3.05 6406.94S 3477.88W
S 38.90 W 1.09 6430.71S 3497.16W
S 38.60 W 1.65 6455.45S 3517.02W
S 38.80 W 2.49 6480.40S 3537.01W
S 37.80 W 3.31 6504.11S 3555.73W
7223.86
7254.43
7286.13
7318.07
7348.25
13423.85 9022.52 8954.29
13455.72 9022.86 8954.63
13486.63 9023.32 8955.09
13517.21 9023.97 8955.74
13547.50 9024.83 8956.60
89 28
89 19
88 58
88 33
88 12
S 37.00 W 2.52 6529.34S 3575.02W
S 37.40 W 1.35 6554.72S 3594.29W
S 37.80 W 1.70 6579.21S 3613.15W
S 36.50 W 4.47 6603.58S 3631.61W
S 37.80 W 4.44 6627.71S 3649.89W
7380.01
7411.87
7442.77
7473.33
7503.60
S=~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/X-19B
500292067602
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 091696
MWD SURVEY
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
13578.92 9025.88 8957.65 87 56
13610.75 9027.04 8958.81 87 54
13639.33 9028.07 8959.84 87 58
13670.21 9029.20 8960.97 87 49
13699.97 9030.36 8962.13 87 43
S 37.50 W 1.28 6652.57S 3669.07W 7535.00
S 37.50 W .12 6677.81S 3688.44W 7566.80
S 36.70 W 2.81 6700.59S 3705.66W 7595.36
S 38.30 W 5.20 6725.07S 3724.45W 7626.20
S 37.30 W 3.37 6748.56S 3742.67W 7655.93
13726.69 9031.36 8963.13 88 0
13761.08 9032.37 8964.14 88 37
13792.53 9033.05 8964.82 88 54
13823.22 9034.27 8966.04 86 33
13854.65 9037.00 8968.77 83 29
S 37.50 W 1.29 6769.77S 3758.89W 7682.63
S 38.30 W 2.94 6796.90S 3780.01W 7716.98
S 38.80 W 1.82 6821.49S 3799.60W 7748.40
S 37.00 W 9.64 6845.68S 3818.44W 7779.05
S 35.80 W 10.45 6870.88S 3837.02W 7810.36
13885.53 9041.16 8972.93 81 1
13915.53 9046.53 8978.30 78 20
13947.16 9053.07 8984.84 77 47
13976.97 9059.35 8991.12 77 53
14008.98 9065.88 8997.65 78 33
S 35.10 W 8.31 6895.80S 3854.76W 7840.95
S 33.00 W 11.25 6920.25S 3871.29W 7870.44
S 33.30 W 2.00 6946.16S 3888.21W 7901.34
S 33.00 W 1.04 6970.56S 3904.14W 7930.44
S 33.50 W 2.59 6996.77S 3921.33W 7961.73
14038.88 9071.78 9003.55 78 40 S 31.50 W 6.57
14085.00 9080.83 9012.60 78 40 S 31.50 W .04
7021.48S 3937.07W 7990.98
7060.04S 3960.70W 8036.05
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 8095.15 FEET
AT SOUTH 29 DEG. 17 MIN. WEST AT MD = 14085
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 216.22 DEG.
TIE-IN SURVEY AT 11,413.68' MD
WINDOW POINT AT 11,428.00' MD
PROJECTED SURVEY AT 14,085.00' MD
Sv'~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/X-19B
500292067602
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 091696
JOB NI/MBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
11413.68 8953.34 8885.11 4927.11 S 2381.70 W
12413.68 9008.66 8940.43 5725.34 S 2964.18 W
13413.68 9022.43 8954.20 6521.22 S 3568.90 W
14085.00 9080.83 9012.60 7060.04 S 3960.70 W
2460.34
3405.02 944.68
4391.25 986.23
5004.17 612.92
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
S~"RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/X-19B
500292067602
NORTH SLOPE BOROUGH
COMPUTATION DATE: 11/ 1/96
DATE OF SURVEY: 091696
JOB NUMBER: AK-MW-60107
KELLY BUSHING ELEV. = 68.23
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
11413.68 8953.34 8885.11 4927.11 S 2381.70 W 2460.34
11443.00 8968.23 8900.00 4947.61 S 2396.45 W 2474.77 14.43
14020.85 9068.23 9000.00 7006.54 S 3927.65 W 4952.62 2477.85
14053.68 9074.69 9006.46 7033.86 S 3944.66 W 4978.99 26.37
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 10505
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
1 O/22/96
Well Job # Log Description Date
BL RF Sepia LIS Tape
-lo-
--/el _ o~-
V 7
B- 01 PRODUCTION PROFILE 961 002 I 1
, ,
B-02A PERFORATING RECORD 96092 8 1 1
C-12 INFLATABLE BRIDGE PLUG 9 61 00 4 1 1
C- 12 INFLATABLE BRIDGE PLUG 961 01 0 I 1
C-32 PERFORATING RECORD 961 005 1 1
C-42 TUBING PUNCH 960 92 9 1 1
F- 16 LEAK DETECTION LOG 9 61 01 I 1 1
Fo16 BAKER WHIPSTOCK SET.REC, 961 01 2 1 1
....
G-12A TUBING PUNCH 960930 1 1
IG-12A TUBING PUNCH 961 001 I 1
H- 19 PERFORATING RECORD 961 007 I 1
J -08 PERFORATING RECORD 961 001 I 1
J-08 iTUBING PUNCH 961 01 3 I 1
W-03 PERF. RECORD 961 01 I I 1
W-(~ ...-3'0 PRODUCTION PROFILE 961 006 I 1
~1'9B BRIDGE PLUG REC.DEPTH DET. 96090 3 I 1
~X-19B PBI . BRIDGE PLUG REC.DEPTH DET. 960901 I 1
Y-28 STATIC PRESSURE SURVEY 961 01 5 I 1
Y-34 STATIC PRESSURE SURVEY 961 01 5 1 1
Z-01 PRODUCTION PROFILE 961 007 1 I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
R ece ive d" by:_~.~..~'~-~ ~ ~.._.~/~
State of Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Howard Okland
3001 Porcupine Drive
Anchorage, AK 99501
Transmittal of Final Prints. Please sign and return copy to:
Western AItas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
iiWell Name
Services
Bluelines R/F Sepia
Film
SETTING SERVICE 1 1
Received b(~: - ~
Date
Contact Rebecca Lange or Jennifer Dietz if you have a question concerning this
transmittal at (907) 659-2816 or Fax (907) 659-2602.
TONY KNOWLE$, GOVERNOR
July 30, 1996
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dan Stoltz, Sr Drlg Eng
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re;
Prudhoe Bay Unit X-19B
BP Exploration (Alaska) Inc.
Permit No. 96-130
Sur. Loc. 356'NSL, 137'EWL, Sec. 05, T10N, R14E, UM
Btmnhole Loc. 3875'NSL, 3836'WEL, Sec. 18, T10N, R14E, UM
Dear Mr. Stoltz:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until
all other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be
given by contacting the Commission petroleum field inspector on the North Slope pager at
65%3607.
Chairman ~
BY ORDER OF THE COMMISSION
dlffEnclosures
CC~
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASK/, OIL AND GAS CONSERVATION Ct.,,MMISSION
PERMIT TO DRILL
20 AAC 25.005
[] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work [] Re-Entry [] Deepen~ [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator i5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RTE = 67.68' Prudhoe Bay Field / Prudhoe
3. Address 16. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047475
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
356' NSL, 137' EWL, SEC. 05, T10N, R14E Prudhoe Bay Unit
At top of productive interval 8. Well Number ' Number 2S100302630-277
121' NSL, 2713' WEL, SEC. 07, T10N, R14E X-19B
At total depth 9. Approximate spud date Amount $200,000.00
3875' NSL, 3836' WEL, SEC. 18, T10N, R14E 08/05/96
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028313 1405'I No Close Approach 2560 14074' MD / 9071' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 7400' Maximum Hole Angle 89.24° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-Mod 4235' 7245' 6572' 11480' 9003' 345 sx Class 'G'
6" 4-1/2" 12.6# L-80 BTC-Mod 2644' 11430' 8974' 14074' 9071' 315 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs(measured) ORIGINAL
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate ~ ~ ~'~ ~ I 'ti //!r~ ~"'~'
Production
Liner
Perforation depth: measured
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Ddlling Program
[] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: David Nakamura, 564-5606 Prepared By Name/Number Terrie Hubble, 564-4628
21. I hereby certify that t~ f~ego~g i,s tr~and correct to the best of my knowledge-O's.
Signed
Dan Stoltz ./~'~ ~__~~~ Title Senior Drilling Engineer Date 7--~-. Z '-~'d
Commission Use Only
Permit Number I APl Number I Approval Date I See cover letter
~,~'-,/,_~<::~ 50-(:~ 2. ~P- ~ O ~o '~'-" ~ ~ -?-~ -- ~ ~' for other requirements
Conditions of Approval: Samples Required [] Yes ~ No Mud Log Required [] Yes ,~ No
Hydrogen Sulfide Measures ~:~Yes [] No Directional Survey Required ,,~ Yes [] No
Required Working Pressure for BOPE [] 2M; []3M; J~ 5M; [] 10M; [] 15M
Other: Original Signed By by order of
Approved By no,,,~ ,~^, ,~,~,~,~,,,,,~ Commissioner the commission Date /-
Form 10-401 Rev. 12-01-85
Submit In Triplicate
I Well Name: X- 1 9B / X- 1 9BL1
Redrill Plan Summary
Type of Well (producer or injector): I Oil Producer I
Surface LocatiOn: 356' FSL 137' FWL Sec 05 T10N R14E
Pilot Hole Location: 457' FSL 2465' FEL Sec 07 T10N R14E
Start of Horizontal Location:
Sadlerochit Zone 4 (lower) Lateral
121' FSL 2713' FEL Sec 07 T10N R14E
End of Horizontal Location: 3875' FSL 3836' FEL Sec 18 T10N R14E
Start of Horizontal Location:
Shublik (upper) Lateral
559' FSL 2390' FEL Sec 07 T10N R14E
End of Horizontal Location: 4629' FSL 3281' FEL Sec 18 T10N R14E
I AFE Number: I 4P0843 I
Estimated Start Date: I August 5, 1996 I
I MD: 1~4074' I I TVD.' 19071' I
Well Design (conventional, slimhole, etc.)
I Rig: I Nabors 18-E
Operating days to complete:
I 45
IRT-GL
29.7'
I KBE: 67.68'
High Angle Multi-Lateral Sidetrack
I
I
Objective: I High angle sidetrack to Zone 4 with a lateral to Shublik I
Casinq/Tubinq Proqram:
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/TVD MD/TVD
8-1/2" 7" 26.0# L-80 BTC-MOD 4235' 7245'/6572' 11480'/9003'
Lower Lateral
6" I 4-1/2" 12.6# L-80 BTC-MO D 2644' 11430'/8974' 14074'/9071'
Upper Lateral
6" I 4-1/2" 12.6# L-80 BTC-MOD 1778' 11340'/8933' 13118'/8979'
I
(slotted)
Production Tubing
I 4-1/2" 12.6# L-80 BTC-MOD 11174' 26'/26' 11200'/8863'
NOTE: Planning only a 50' 4-1/2" liner lap in for the Sadlerochit (upper lateral). This is needed to
ensure there is room to set the multi-lateral whipstocks and packers for the Shublik lateral.
I am asking for an exception to AOGCC rule 20 AAC 25.030.d.5.B which states "a
cemented liner must have a minimum of 100' of cemented lap within the next larger
casing."
X-19B / X-19BL1 Permit Information Page 1
Cement Calculations:
I Liner Size: I 7" liner I
Basis:I 1000' MD of cement above the Sag River with 50% open hole excess, 80' shoe joint, 3!9' 8-1/2"
I
pilot hole P&A'd with stinger with 50% open hole excess
Total Cement Volume: I 345 1 sxs of 15.8 ppg Class G Blend @ 1.15 ft3/sx
No hydrocarbon zones identified above Sag River
I Liner Size: I 4-1/2" liner (Sadlerochit lower lateral)
IBasis:I 40% open hole excess, 80' shoe joint, 50' liner lap and 200' cement on top
Total Cement Volume: I 315 1 sxs of 15.7 ppg Class G Blend @ 1.17 ft3/sx
Mud Program:
Sidetrack drilling fluid will be used as a milling fluid.
Special design' I '
considerationsI 8-1/2" Sidetrack drilling fluid to Pilot Hole TD
Depth Density Marsh Yield 10 sec. 10 min pH Fluid
(PPG) Viscosity Point ~lel ~lel ° Loss
Initial 9.8 40-50 10-12 4-8 6-10 9.0 <6
Final 10.0 45-50 10-12 6-10 8-12 9.0 <6
Treat mud for Kingak shales with 2 ppb Baratrol, 2 ppb Boreplate and 2 ppb Baranex
Keep HTHP filtration rate at less than 13 cc
Will use fluid to drill to pilot hole TD (11799' MD / 9163' TVD)
Special design I New Sheardril-n mud system will be used to drill 6" Sadlerochit
considerationsI 8.5 PPg viscosified KCI water to drill 6" Shublik
Depth Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point ~lel ~lel Loss
Initial 9.0-9.2 50-60 30-40 15-20 18-24 8.5 - 9.0 <6
Final 9.0-9.2 50-60 30-40 15-20 18-24 8.5 - 9.0 <6
Directional-.
I KOP= 17400' MD
Maximum Hole Angle: I 89.24°
Close Approach Well: I No Close Approach Wells
Well Control:
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be
installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Shared Services Drilling Contact:
Contact David Nakamura at (907) 564-5606 to answer any questions concerning Permit to Dr?l.
t;~, .-.., v,., ..,
X-19B / X-19BL1 Permit Information Page 2
Drilling Hazards:
· Maximum anticipated BHP: 3596 psi @ 8800' TVDss (7.7 ppg EMW)
· Maximum surface pressure: 2470 psi @ 8800' TVDss
· Planned Completion Fluid: 8.5 ppg filtered sea water
a. The drilling fluid program and surface system will conform to the regulations set forth in
20AAC25.003.
b. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi).
c. The most recent H2S level on this well indicated 14 ppm H2S (maximum 14 ppm). Even
though very little H2S has been detected, proper precautions will be taken as needed.
d. No hydrocarbon-bearing zones expected above the Sag River formation.
e. Stuck pipe problems have occurred on X Pad in the Kingak, Sag River, Shublik and Sadlerochit
formations. Faults have shown to be highly conductive on X Pad.
f. Lost circulation planned for while drilling Shublik. Lost circulation problems have occurred on X Pad
in Kingak and Sadlerochit formation. Faults have shown to be highly conductive on X Pad.
g. Planning only a 50' 4-1/2" liner lap in for the Sadlerochit. This is needed to ensure there is
room to set the multi-lateral whipstocks and packers for the Shublik lateral. I am asking for an
exception to AOGCC rule 20 AAC 25.030.d.5.B which states "a cemented liner must have a
minimum of 100' of cemented lap within the next larger casing."
X-19B / X-19BL1 Permit Information Page 3
X-19B / X-19B L1 Operations Summary
Pre-Rig Operations
1. Pull the 4-1/2" SSSV. Valve is set at 2206' MD. Test the 9-5/8" mandrel packoff to 5000 psi.
Notify an AOGCC representative prior to commencing plug-back operations. R/U cement unit &
establish an injection rate. Bullhead and squeeze perforations at 9782' - 10012' MD Displace to
leave the top of cement in 7" liner no lower than 9682' MD. Pressure test as per AOGCC
requirements.
NOTE: Top of cement must be to at least 9682' MD to comply with State regulations on
cement being 100' MD above perforations.
.
With an AOGCC representative on location to witness the operation, R/U slickline and tag the top
of the cement to verify cement top is at least at 9682' MD.
.
RIH and cut the 4-1/2" 13Cr-80 tubing with a jet cutter in the middle of a full joint of tubing at
approximately 7650' MD.
NOTE: This will place the tubing cut approximately 205' MD below the bottom of the
section window cut in the 9-5/8" casing.
.
Displace the tubing and wellbore to 8.5 ppg seawater.
Freeze protect top 2200' MD with diesel.
Bleed tubing and annuli pressures to zero.
Set BPV in the tubing hanger and test from below to 1000 psi. Se'cUre'welr.-'
Remove the well house and flowlines. If necessary, level the pad and dig out the cellar.
Rig Operations
1. MIRU drilling rig.
.
Pull BPV. Circulate out freeze protection from inner and outer annuli and recover for future use.
Test 9-5/8" mandrel packoff to 5000 psi. If pack-off fails, change out packoff in Step 5 prior to
cutting the section.
3. Install a TWC and test from below to 1000 psi. N/D the production tree.
,
N/U BOP. Test BOP to 250/5000 psi against TVVC. Test annular preventer to 250/2500 psi.
Remove TVVC. Send adapter flange and tree to DSM for inspection and repair.
.
Pull and lay down the 4-1/2" tubing. (Tubing should be jet cut at 7650' MD. Check the location
and exact depth of the cut on production handover form) Inspect for NORM. If 9-5/8" mandrel
packoff did not test in Step 2, pull and replace packoff through the BOP stack.
.
RIH with bridge plug. Set bridge Plug at approximately 7645' MD. This will place the bridge plug
200' below the base of the section window at 8294'.
7. Shut in well and test casing to 3500 psi for 30 minutes to ensure casing integrity.
X-19B / X-19BL1 Permit Information Page 4
.
.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
PU section mill, RIH and spot 18.0 ppg pill from the bridge plug at 7645' to the base of the
proposed window at 7445'. Displace well to milling fluid. Space out and mill section from 7395'
to 7445'. POOH.
RIH with open-ended drillpipe. Mix and spot a 17.0 ppg cement kick-off plug (per recommended
practices) from 7545' to 7195' MD. POOH a minimum of 12 stands. Perform a hesitation
squeeze. Do not exceed a final squeeze pressure of 2,000 psi and do not displace cement any
closer than 100' above section top.
RIH with an 8-1/2" steerable assembly with MWD. Tag TOC. MINIMUM WOC TIME IS 12
HOURS. Dress off cement plug to 7400' (5' below top of section). Kickoff and build to 60°
tangent inclination. Hold tangent to pilot hole TD. PU and drill with MWD
GR/Resistivity/Directional from the Sag River to the pilot hole TD.
RU Atlas and DPC Icg the pilot hole with GR/AC/DIL/ZDL/CNL logging tools.
RIH with 7", 29#, L-80 liner with a MLAS-CV joint and a 9-5/8" x 7" liner hanger/packer spaced
out for a 150' lap. The liner will also be run with a 7" x 3-1/2" stinger assembly with two joints of
aluminum tubing to P&A the pilot hole as well as cement the 7" liner in place. Cement the liner in
place with the total cement volume based on 1000' MD above the Sag River with 50% excess in
open hole and 80' shoe volume. Set liner hanger/packer.
NOTE: Planning only a 50' 4-1/2" liner lap in for the Sadlerochit. This is needed to ensure
there is room to set the multi-lateral whipstocks and packers for the Shublik lateral. I am
asking for an exception to AOGCC rule 20 AAC 25.030.d.5.B which states "a cemented
liner must have a minimum of 100' of cemented lap within the next larger casing."
RIH with 6" steerable assembly (MWD/GR/Resistivity). Clean out liner to float collar. Test liner
and liner lap to 3500 psi. Finish cleaning out liner to aluminum joints of tubing. Kickoff through
the aluminum joints of tubing and directionally drill to Zone 4 building and turning at 25°/100'.
Displace hole to new Sheardril-n system when kicked off and in new formation. Continue drilling
6" horizontal hole to TD.
RIH with hole opener to TD of horizontal section if hole conditions warrant.
RIH with 4-1/2", 12.6#, L-80 solid liner 7" x 4-1/2" packer/hanger spaced out for a 50' lap.
Cement liner in place with the total cement volume based on 40% excess in open hole, 50' lap
and 80' shoe volume. Set liner hanger/packer.
RIH with 3.75" bit and 7" casing scraper. Cleanout 4-1/2" liner to landing collar. Test liner to
3500 psi. Displace well to seawater. POOH.
RIH with 2-3/4" drillpipe conveyed perf guns and perforate 4-1/2" liner. POOH and lay down
guns.
Set 7"x 4-1/2" permanent production packer (with 4-1/2" tubing tail) at 11347' MD (17' MD below
the planned top of whipstock).
Set oriented, retrievable whipstock above permanent packer so the top of the whipstock window
will be at 11330' MD.
Displace well to Sheardril-n mud system used to drill lower lateral. Mill window off whipstock at
11330' MD and drill 29' window/new hole. POOH.
RIH with 6" steerable assembly (MWD/GR). Kickoff and directionally drill in Shublik, building and
turning at 25°/100'. Displace hole to viscosified KCL water when built to horizontal. Continue
drilling 6" horizontal hole to TD.
X-19B / X-19BL1 Permit Information Page 5
22.
23.
24.
25.
26.
27.
28.
29.
RU Atlas and DPC log the Shublik with FMS and GR/AC/DIL/ZDL/CNL logging tools.
A wiper trip may be made prior to running production liner.
Run and set a 4-1/2", L-80 slotted liner. Top of liner will be at 11340' MD (10' below casing exit).
RIH and pull retrievable whipstock.
RIH with 4-1/2", 12.6#, L-80 completion with SSSV, GLMs and 7"x 4-1/2" packer.
Set TWC valve. Test to 1000 psi. ND BOPs.
NU tubing head adapter and tree. Test same to 5000 psi. Pull TWC valve. Freeze protect well.
Set packer and test tubing to 4000 psi. Test tubing annulus to 3500 psi. Set BPV.
Release rig. Complete appropriate documentation and handover to Production.
X-19B / X-19BL1 Permit Information Page 6
CHRISTMAS TREE: 4' FMC
WELLHEAD: McEvoy 13-3/8'
SSSV @ 2100'
X-19B / X-19B L1
KB. ELEV = 67.68'
BF. ELEV = 37.98'
13-3/8", 72#,
L-80 BTC
@ 2703' MD
4-1/2", L-80, BTC Mod Tubing
GAS LIFT MANDRELS
No. MD TVDss DEV
Gas Lift Design TBA
KOP @ 7395' MD
Milled Section
7395'-7445' MD
Odginal Hole Angle = +_26°
Bridge Plug
+7645' MD
Top of Fish
4-1/2", Tbg
@ +7650' MD
9-5/8", 47#, L-80,
BTC @ 8665' MD
9-5/8" x 7" Liner Hgr/Pkr
@ _+7245 ' MD
Tail 'X/X/X' Completion
x 4-1/2" Prod Packer @_+11200' MD
Proposed Tangent @ 60° (thru Zone 4)
MLAS-CV Sub in Sa River at _+11303' MD
KOP at 11330' MD
4-1/2", L-80, Slotted Liner X-19B L1
~) 13118' MD
7" Prod Packer @ _+11347' MD
w/4-1/2" Tailpipe & 'XN' nipple (3.725" ID)
/2" Liner Hgr/Pkr @ _+11430' MD
7" shoe @ _+11480' MD
14074' M D
7", 26#, L-80, Cemented Liner
(TOC @ 1000' above Sag River)
4-1/2", L-80, Cemented Liner
7", 29#, 13Cr-80
NSCT @ 10200' MD
DATE REVISED BY COMMENTS PRUDHOE BAY UNIT
7-22-96 DRN Proposed Sidetrack-MultiLateral Completion WELL: X-19B
APl NO 50-029-20676-02
WELL: X-19B L1
APl NO 50-029-20676-60
SEC 7; T10N; R14E
BP Exploration (Alaska)
.-19-96 11:41 Ana.~'-ill DPC 903 344 2160 P.04
SHARED SERV ICES DR ILL I NG
u I X-1U~Ft~i th'U4J F1 101: r1018
I VERTICAL SECTION VIEW
i ' Section at: 216.22
~ ~ TVD Scale · ~ inch : 1200 feet
o Dep Scale.' ~ inch : ~200 feet
Drawn ..... '07/18/96
I
'~r,r~-:~,~ .....~Anadri ]] Sch]umberger
O , , i Marker Identification MD BKB 5ECTN INCLN
~ I A) Tie-in 7299 6621 2535 25.62
· · I B) TOP ~ WIN~W 7395 6708 2575 25.09
~ C) K0P / CURVE 8/t00 7400 6712 2577 25.06
D '-'~ .......... D) END CURVE 8/~00 7960 7138 2902 57.79
'S~l' '3D~' ....... ~ E) CURVE B/t00 ~0836 '13"$70 481t6 57.7~
· F) END CURVE 8/~00 :~209 8868 5194 60.00
~ ' Gl TARGET 11309 8918 5281 60.00
~· ; · ,
, H) 7" CASING PI 11313 8920 5284 60.00
'siR- "'3F"~' ...... ,- - ' j'-
· I) TO 11799 9163 5705 60.00
i
~ ...... j._-_ _-.-y_,y_ - ......... -,- ---
'~r - ~ ..... j · . '
i ' I
i
,~ ~NADR ILL AKA-DP(
~- : APhiD
'~- '~- ..... i .....', ~)'R PI:RMI TTiI',IG
'~3- ~'i ...... "~ ........ ~ ''~ I '¢ L,,,
' : P .AN ¢¢ ~' ~
) ........................... ~' .... ~i-~- - ..... ' :'--- - ...." ' .... , ' "~ ' ....
i.
,
:
'L~U"/"F~' - ~ i, .............. i~'~-t ~ ....
,
' -'%- L ...........
-rTe- "~/'4¢' t - - ..................
- . . .... .....
: ' ': ', / i
ri'c,... ~,, /".~ '" ; '., ,.' , ',~. . ¢.~,"°:_:10
_
0 600 ~200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800
Sect ion Departure
(Anadr~,]l {c)96 XlgBPtiP4 3.0b.03 4:43 PM PI
..... S'HARED ..... SERVICES
a~O0
X- ~ 9BPB ~ (P04) P i lot Ho l e
VERTICAL SECTION VIEW
i ii ii i i i
Section at: 2~6 22
DR]:L"i' 'NG
~ i
' ' i : ~ Joep Scale.: 1 inch = 500 feet.
............. : -. : ................. ~ IOr'awn ..... : 07/~_8/96
I i
, ,
......~t O~,a : .... I ..... Marker Identification HD BKB SECTN INCI
, ~ { i i i A) Tje-in 7299 6621 2535 25.f
~ I B) TOP OF WINDON 7395 6708 2575 25.(
~ j ' __ C) KOP / CURVE 8/100 7400 6712 2577 25.(
~ I ~ D) END CURVE 8/100 7960 7138 2902 57.
E) CURVE 8/100 10836 6670 4896 57.'
' '~ i ' i F) END CURVE 8/100 11209 8868 5194 60.(
, ,
i -,,. ~ ,.i Gl TA,GET 11309 Bgm 528~ 60.~
---- ,~ .... I, .............. : , ,
I , i I H) 7' CASING PT t1313 8920 5284 60.(
t , , I) TO 11799 9~63 5705 BO.(
-c[ 'J --"~ ]- AN,~,DRILL ,
'L ~.U '/ "I ~'N6r' -I~'~ ................... L - -.
.... ~ .... i AKA,DPC
',,, i
..... . ... ',. : . ~.. , ...... FOR PER~IT"ING--
X ,
! J~ J j - - -i-,- i -J:]-.LAN! Ob_.~ LYH
C
,.,~ ~.m~, · ¢' ' ~ .... - i '
.. , . . ., ....
-~- ~,~, ........ ,,; . ~. ..... ~ ...... i ........ ..'.i ,
:." ' iL~i .- .-. ,,
: : ---~-- Ac: =:: :::'J/- :=== :::::'_:
=~=~ ~ -~, .
_~:- ' : -'~ ....... ' .......... ~ ::::::1::--"::: -------;- i
:~ I~ -' ~ '
~; -~-~ : =,=: ::::=======..::::== ;_- _~-- ~-: ~
· i ' _'?~-. .i ........... ;.'
-~z~- -~-~ .............. ~ ~ ! , i :
~) ': ~ :
-: ...... i '-' ) '
i
,
·
(Xnadr:]] [c)96 xIgoFg-P4 3.00.03 4:43 PM P)
2650 2900 3150 3400 3650 3900 4150 4400 4650 4900 5150 5400 5650 5900 6150 6400 6650 6900
.
Section Departure
i i mi i
79
79
O0
O0
O0
O0
-19-96 11:42 Ana ..... ill DPC 9OZ. 344 2160 P.06
I ......... SHARED SERVICES 'DRILLING
i
Marker Ident i f i ca t ion MD N/S E/W
,I ~-~.s~.v~ ~ ~s ~o~ x-~gBPB1 (PO4) Pilot Hole
~I Ko./cu.v~ ~/~oo ~oo ~7~s ~o~, PLAN VIEW'-~
DJ END CURVE 8/100 7960 2039 S 2128 W
El CURVE 8/100 10836 4471 S 2181 W CLOSURE ' 5788 feet at Azimuth 206.53
F) END CURVE 8/100 11209 4766 S 2283 ~
Gl TAROT 11309 4836 S 2334 W DECLINATION.' +28.382 (E)
H) 7" CASING PT 113~3 4839 S ~336 W SCALE · I inch : 1200 feet
Il TO t~798 5~78 S 2585 W
DRAWN · 07/19/96
m
Anadrl]] Schlumberger
m m
. ,, .. / ......
ONLY~'
, ' . 2~00
.
..............................
, ~ ..................... ]000
I
: ~ ' ~fiO0
· -- t
.
: : ' ' {R(,d~us 150 feet )
' ~ ~800
~ ~' '
~ F'~' ...., ~,
_
'-'" "'" 7200
7800 7~00 SilO0 SOOO 5~oo 4800 q200 ~fiO0 ~000 2~00 1800 I200
<- ~[SI ' [~SI ->
(~aHrill [rl~ ~l~z q d~ dl fl. ~n lu ol
Anadrill Schlumberger
Alaska District
1111 East 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 344-2160
DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLI~~ '
ANADRILL AKA-DPC
APPROVED
FOR PERMITTING
ONLY
PLAN
well ......... : X-19BPB1 (P04)
Field ........ : Prudhoe Bay, X-Pad
Computation,.: Minimum Curvature
Units ........ : FEET
Surface Lat,,: 70.24364111 N
Surface Long,: 148.65907965 W
Pilot Hole
Legal Description
Surface ...... : 356 FSL 5143 FEL
Tie-in Survey: 3950 FSL 1858 FEL
TARGET ....... : 799 FSL 2214 FEL
BHL .......... : 457 FSL 2465 FEL
LOCATIONS - ALASKA Zone:
X-Coord
4
Y-Coord
S05 T10N R14E UM 666011.72 5940488.23
S07 T10N R14E UM 664059.91 5938759.42
S07 T10N R14E U~4 663784.95 5935602.27
S07 T10N R14E UM 663541,79 5935254.53
Prepared ..... : 07/19/96
Vert sect az.: 216.22
KB elevation.: 67,68 ft
Magnetic Dcln: +28.382 (E)
Scale Factor.: 0.99993131
Convergence..: +1.26201816
PROPOSED WELL PROFILE
I
STATION MEAS INCLN
IDENTIFICATION DEPTH ANGLE
TIE-IN SURVEY
TOP OF WINDOW
KOP / CURVE 8/100
END CURVE 8/100
LCU / TKNG
7299 25.62
7395 25.09
7400 25.06
7500 28.90
7600 34.11
7700 40.14
7800 46.69
7900 53.55
7960 57.79
9602 57.79
TJID 10675 57.79
DIRECTION VERT-DEPTHS SECT
AZIMUTH TVD SUB-S DIST
232.10 6621 6554 2535
232.10 6708 6640 2575
232.10 6712 6645 2577
216.56 6802 6734 2622
204.88 6887 6819 2673
196.15 6967 6899 2731
189.44 7039 6972 2794
184.06 7103 7036 2861
181.26 7138 7070 2902
181.26 8013 7945 4041
181,26 8585 8517 4785
COORDINATES-FROM
WELLHEAD
1685.52 S 1989.55 W
1710.70 S 2021.89 W
1712.00 S 2023.56 W
1744.48 S 2054.72 W
1789.40 S 2080.95 W
1845.89 S 2101.75 W
1912.85 S 2116,71 W
1988.98 S 212~.53 W
2038.76 S 2127.81 W
3427.53 S 2158.43 W
4335.23 S 2178.44 W
STATE-PLANE TOOL DL/
X Y FACE 100
664059.91 5938759.42 LS <TIE
664028.14 5938733.54 179L 0,55
664026.49 5938732.20 69L 0.62
663996.06 5938699.05 55L 8.00
663970.82 5938653.56 45L 8.00
663951.28 5938596.63 38L 8.00
663937.80 5938529.36 33L 8.00
663930.65 5938453.06 29L 8.00
663929.47 5938403.25' 8.00
663929.44 5937014.23 0.00
663929.43 5936106.37 0.00
o
(Anadrill (c)96 X19BPHP4 3.0b.03 8:07 AM P)
X-1RBPB1 (P04) Pilot Hole
07/19/96 Page 2
PROPOSED WELL PROFILE
STATION
IDENTIFICATION
c~vs 8/lOO
TJB
MEAS INCLN DIRECTION VERT-DEPTHS SECT
DEPTH ANGLE AZIMUTH TVD SUB-S DIST
10836 57.79
10900 57.47
10976 57.47
11000 57.56
11100 58.36
COORDINATES-FROM STATE-PLANE TOOL DL/
WELLHED~D X Y FACE 100
181,26 8670 8603 4896 4470.99 S 2181.44 W 663929.42 5935970.60 95R 0.00
187.34 8705 8637 4942 4525.06 S 2185.50 W 663926.55 5935916.45 92R 8.00
194.40 8745 8677 4999 4586.59 S 2197.31 W 663916.10 5935854.68 88R 8.00
196.82 8758 8691 5019 4607.40 S 2203.13 W 663910.75 5935833.75 87R 8.00
206.22 8812 8744 5101 4686.11 S 2234.20 W 663881.42 5935754.38 82R 8.00
END CURVE 8/100
CGOC
TSGR
TARGET
11200' 59.83
11209 60.00
11303 60.00
11303 60.00
11309 60.00
215.39 8863 8795 5186 4759,66 S 2278.11 W 663839.14 5935679.88 77R 8.00
216.22 8868 8800 5194 4766.20 S ,2282.82 W 663834.57 5935673.24 8.00
216.22 8915 8847 5275 4831.87 S 2330.93 W 663787.92 5935606.53 0.00
216.22 8915 8847 5275 4831.87 S 2330.93 W 663787.92 5935606.53 0.00
216.22 8918 8850 5281 4836.06 S 2334.00 W 663784.95 5935602.27 0.00
7" CASING PT 11313 60,00
TSHB 11337 60.00
TSAD / TZ4B 11489 60.00
HOT 11559 60,00
TZ4A 11603 60,00
216.22 8920 8852 5284 4838.86 S 2336.05 W 663782.96 5935599.43
·
216.22 8932 8864 5305 4855.62 S 2348.33 W 663771.05 5935582.40
216.22 9008 8940 5436 4961.82 S 2426.12 W 663695.62 5935474.53
216,22 9043 8975 5497 5010.72 S 2461.95 W 663660.89 5935424.85
216.22 9065 8997 5535 5041.46 S 2484.47 W 663639.05 5935393.63
0.00
0.00
0.00
0.00
0.00
COWC 11649 60.00
OOWC 11649 60.00
TD 11799 60.00
TZ3
216.22 9088 9020 5575 5073.60 S 2508.01 W 663616.23 5935360.98
216.22 9088 9020 5575 5073.60 S 2508.01 W 663616.23 5935360.98
216.22 9163 9095 5705 5178.39 S 2584.77 W 663541.79 5935254.,53
9183 9115
0.00
0.00
0.00
(Anadrill (c)96 X19BPHP4 3.0b.03 8:07 AM P)
ANADRILL AKA-DPC
APPROVED
FOR PERMITTING
ONLY
PLAN
>
0
0
' SHARED "SE'R" TCES DRI'LLING ' '
i i I I i I I Ill! I - · II
- I I III I I I I I II · I III I I II
Anad£.i ] ] Sch ]umbe£gen
X-19B (PO4)HAW
VEFITICAL SECTION VIEW
Section at: 2~6.22
., vo Scale.: ~'inch = 400 feet
~ j , '. IOep Scale,: ~ inch = 400 feet
-~t' ........... ; ........ :' . ........ I-'I' i-' i IOrawn ; ' ..... : 07/,9/96
i i , , '
.... -'!---~-~ ............. . '.' ' -- Marker Identification MD BKB SECIN INCL
ANA RILL AKA-E,PC : Al TIE-IN / K0P 25/100 lt480 9003 5428 60.0
APPR()VEE : CI DROP J0/,00 ,~,43 9008 50BB 92.7
,I : ONLY <~ ,~ FI TAR6ET (ESL) ~3825 9033 7767 89.1
, j Im ) , ~/ I Gl DROP $0/100 J3825 9033 7767 89.~
.... I m pLAIq ¢ H ¢~ c
~ I HI END DROP ~0/~00 13924 9043 7865 79.2
...... t _ i Il TZ4A 14042 9065 798t 79,2
i ~ ...... ' ....... t dl 4-,/2" LINEnPT 14074 907t 80,3 79.2
....... i .... I ...... KI fD t407~ 9071 80~3 79.~
,
, , ,
I
; ' I
':~- ~f~¢ ~ ~ j ' ., : J
. , i ' I
3~ :--:: -::::;::::: ..... =:
TAD~¢T f~ql I ' ~ [ , ,
%---:~,; .... ~__ : ..... ~ .................... ~._~_
I
. .
/
i J
'~ , .. : ...... ~ : j.
-~ ~¢9 ...................... ~-~ ......-~ ....., l l -- .... ~ .......... I .......... %' 'T ................ ' ' ~
--- : I :
i
· :
,
': [ '"
..... , ...... '-- j ............... F ...........
I '
5200 5400 5800 5800 6000 6200 6400 6600 6800 7000 7200 7400 7~0 7800 8000 8200 8400 8600
Sectien Departure
i i I IIII I
~adr~l] ~c)96 x~9~zp4 3.0b.03'9:09 AM P)
88O0
I0
Ju1-19-96 11:46 Ana¢~-'-'ill DPC 907_ 344 2160 P. 12
SHARED SERVTCES DRILL]~NG~
Marker IOentification MD N/S E/W
A) TIE-IN / KOP 25/~00 1,480 4955 S 2421
END BUILD 25/100 ,161, 5057S 2495
F) 'AR6ET IESLI '3825 6842 S 3803
G) DROP ,0/,00 ~382§ 6842 $ 3803
Hi END DROP I0/100 ,3924 6§21S 3861W
J) 4-'/2" LINER PT 14074 7040 $ 3949W
K) TO 14074 7040 S 3949~
X-19B (PO4)HAW
PLAN
,,=
CLOSURE ..... : 8072 feet at Azimuth 209.29
DECLINATION.: +28.382 (E)
SCALE ....... : ~ inch : 1200 feet
DRAWN ....... :07/19/96
~naErY ] ] Sob ]uml~erger
...........
~m
~,NADRILL A,<A-DPC-
! , P.AN.~ fi' ~1~ . ,
I,
I ,
i ,
........... [ .................................................. ! ...... ~ ................
I
'.
...........................
-
I
................................. ~
:: .............. ~ ................... ~ ............ ~ .........
,
7800 7200 6600 6000 5400 4800 4200 3600 3000 2400 1800 1200 600 0 600
<- WEST ' EAST ->
(Anadri)l (c)96 XJgBHAP4 3_00.03 ~ 10 AH P)
Anadrill Schlumberger
Alaska District
1111 East 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 344-2160
ANADRILL "
/&,,,.,-,.
APPROVED
FOR PERMITTI,x
ONLY
PLAN
DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING
Nell ......... : X-19B (P04) HAW
Field ........ : Prudhoe Bay, X-Pad
Computation..: Minimum Curvature
Units ........ : FEET
Surface Lat..: 70.24364111 N
Surface Long.: 148.65907965 W
LOCATIONS - ALASKA Zone: 4
X-Coord Y-Coord
Legal Description
Surface ...... : 356 FSL 5143 FEL S05 T10N R14E UM 666011.72 5940488.23
Tie-in/KOP...: 680 FSL 2301 FEL S07 T10N R14E UM 663700.25 5935481.15
TARGET (BSL).: 121 FSL 2713 FEL S07 T10N R14E UM 663303,04 5934913.08
TARGET (ESL).: 4073 FSL 3690 FEL S18 T10N R14E UM 662360.21 5933564.73
BHL .......... : 3875 FSL 3836 FEL S18 T10N R14E UM 662219.48 5933363.48
Prepared ..... : 07/19/96
Vert sect az.: 216.22
KB elevation.: 67.68 ft
Magnetic Dcln: +28.382 (E)
Scale Factor.: 0.99993131
Convergence..: +1.26201816
PROPOSED WELL PROFILE
STATION
IDENTIFICATION DEPTH ANGLE
TIE-IN / KOP 25/100 11480 60.00
11500 65.00
11550 77.50
11600 90.00
END BUILD 25/100 11611 92.71
MEAS INCLN DIRECTION VERT-DEPTHS SECT COORDINATES-FROM STATE-PLANE TOOL DL/
AZIMUTH TVD SUB-S DIST WELLHEAD X ¥ FACE 100
216.22 9003 8935 5428 4955.31 S 2421.35 W 663700.25 5935481.15 HS <TIE
216.22 9012 8945 5446 4969.61 S 2431.83 W 663690,09 5935466.61 ES 25.00
216.22 9028 8961 5493 5007.73 S 2459.76 W 663663.01 5935427.89 HS 25.00
216.22 9034 8966 5543 5047.75 S 2489.07 W 663634.59 5935387.24 HS 25.00
216.22 9033 8966 5554 5056.50 S 2495.48 W 663628.37 5935378.35 25.00
DROP lo/ioo
END DROP 10/100
TARGET (BSL
TSAD / TZ4B
12143 92.71
12150 92.05
12179 89.13
12179 89.13
12179 89.13
216.22 9008 8941 6086 5485.62 S 2809.83 W 663323.57 5934942.45 LS 0.00
216.22 9008 8940 6092 5490.95 S 28%3.74 W 663319.78 5934937.03 LS 10.00
216.22 9008 8940 6122 5514.51 S 2831.00 W 663303.04 5934913.09 10.00
;.
216.22 9008 8940 6122 5514.52 S 2831.01 W 663303.04 5934913.08 10.00
216.22 9008 8940 6122 5514.52 S 2831.01 W 663303.04 5934913.08 10.00
TARGET (ESL
13825 89.13 216.22 9033 8965 7767 6841.87 S 3803.37 W 662360.21 5933564.73 LS 0.00
[Anadrill (c)96 X19B}LAP4 3.0b.03 8:58 AM P)
.
X~lgB (PO4) HAW
S TAT I ON
IDENTIFICATION
DROP 10/100
El%rD DROP 10/100
HOT
PROPOSED WELL PROFILE
07/19/96 Page 2
MEAS INCLN DIRECTION VERT-DEPTHS SECT
DEPTH ANGLE AZIMUTH TVD SUB-S DIST
13825 89.13
13850 86.61
13900 81.61
13924 79.24
13924 79.24
TZ4A 14042 79.24
TD 14074 79.24
COORDINATES-FROM STATE-PLANE TOOL DL/
WELLHEAD X Y FACE 100
216.22 9033 8965 7767 6841.87 S 3803.37 W 662360.21 5933564.73 LS 10.00
216.22 9034 8966 7792 6862.17 S 3818.24 W 662345.79 5933544.12 LS 10.00
216.22 9039 8971 7842 6902.28 S 3847.62 W 662317.30 5933503.37 LS 10.00
216.22 9043 8975 7865 6921.11 S 3861.41 W 662303.93 5933484.25 10.00
216.22 9043 8975 7865 6921.11 S 3861.42 W 662303.92 5933484.24 10.00
216.22 9065 '8997 7981 7014.53 S 3929.85 W 662237.57 5933389.35
216.22 9071 9003 8013 7039.99 S 3948.50 W 662219.48 5933363.48
0.00
0.00
ANADRILL AKA-DPC
APPROVED
FOP, PERMITTt NG
ONLY c,~
PLAN .~ "t ~
(Anadrill (c)96 X19BHAP4 3.0b.03 8:58 AM P)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Pedorate
[] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
5. Type of well: 6.
[] Development
[] Exploratory 7.
3. Address [] Stratigraphic
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. LocatiOn of well at surface 8.
356' NSL, 137' EWL, SEC. 5, T10N, R14E 9.
At top of productive interval
1537' SNL, 2836' WEL, SEC. 7, T10N, R14E
At effective depth
1493' SNL, 2972' WEL, SEC. 7, T10N, R14E
At total depth
1486' SNL, 2993' WEL, SEC. 7, T10N, R14E
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10200 feet Plugs (measured)
9207 feet
10160 feet Junk (measured)
9173 feet
Datum Elevation (DF or KB)
KBE = 67.18'
Unit or Property Name
Prudhoe Bay Unit
Well Number
X-19A
Permit Number
92-144
10. APl Number
50-029-20676-01
11.
Pool __
Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Casing
Length Size Cemented MD TVD
Structural
Conductor 80' 20" x 30" 8 cu yds concrete 110' 110'
Surface 2675' 13-3/8" 3906 cu ft Arctic Set II 2703' 2625'
Intermediate
Production 8629' 9-5/8" 1330 cu ft Class 'G', 130 cu ft AS I 8665' 7893'
Liner 1681' 7" 390 cu ft Class 'G' 10198' 9206'
Perforation depth: measured
true vertical
9894'-9957', 9964'-9970', 9972'-9992', 10000'-10012'
8949'-9002', 9008'-9013', 9015'-9031', 9038'-9048'
RECEIVED
JUL 2 3 1996
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13Cr, NSCT to 9691'
Alaska 0il & Gas Cons. Commission
Anchorcge
Packers and SSSV (type and measured depth) 4-1/2" Otis SSSV at 2206'; 9-5/8" DV packer at 2593'; 7" liner top packer at
8517'; 7"x4-1/2" Baker SABL packer at 9627'
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
4. Estimated date for commencing operation
July 24, 1996
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Contact Engineer Name/Number: David Nakamura, 564-5606 Prepared By Name/Number
17. I hereby certify that the foregoing is true and correct to the best of my knowledge I2~
Signed
Title Senior Drilling Engineer
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Terrie Hubble, 564-4628
I Approval No. ~ &_ /¢~
Plug integrity u"" BOP Test __ Location clearance
Mechanical Integrity Test __ Subsequent form required 10-
Approved by order of the Commission
Form 10-403 Rev. 06/15/88 '~'~
0rjgJrlal SJgn~0 :; Commissioner
David W. J0hns~or
Submit In Triplicate
· WELL PERMIT CHECKLIST COMPANY
GEOL'ARE~ ' ~-~'~"~ UNIT# ! /,/~',~Z~'~ ON/OFFSHORE
3.
4.
5.
6.
7.
8.
9.
10.
11.
~,bM-iNiSTRATION ........................
1. Permit fee attached ....................... fY
2. Lease number appropriate .................... - Y
Unique well name and number ................ Y~
Well located in a defined pool .................
Y
Well located proper distance from ddg unit boundary ..... Y
Well located proper distance from other wells ......... Y
Sufficient acreage available in ddlling uniL .......... Y
If deviated, is wellbore plat included .............. Y
Operator only affected party .................. Y
Operator has appropriate bond in force .......... ~ . Y
Permit can be issued without conservation order ..... Y
Permit can be issued without administra~ve approval .... Y
Can permit be approved before 15-day wail ........ Y
ENGINEERING
,N
N
N
N
N
N
REMARKS
14. Conductor string provided ................... Y N~
15. Surface casing protects ail known USDWs .......... Y N ~-'b~.
16. CMT vol adequate to circulate on conductor & surf csg .... Y
N
17. CMT vol adequate to tie-in long sffing to surf csg ....... ....Y N
CMT will cover
18. ail known productive horizons ......... N
19. Casing designs adequate for C, T, B & permafrost. ..... .~) N
20. Adequate tankage or reserve pit ................ (.~N
21. If a re-drill, has a 10-403 for abndnmnt been apl)roved .... (.~N
22. Adequate wellbore separation proposed ............ ~N
23. If diverter required, is it adequate ................
24. Ddlling fluid program schematic & equip list adequate .... ~ N
25. BOPEs adequate ............. ,,.., ......... ¢,.~N
26. BOPE press rating adequate; test to ~ 0'¢,'~ _osig..~_~N
27. Choke manifold complies w/APl RP-53 (May 84) ....... ,Y(,~N {''J~
28. Work will occur without operalJon shutdown ..........
29. Is presence of H2S gas probable ...............
GEOLOGY
D E
30. Permit can be issued w/o hydrogen sulfide measures ..... Y N
31. Data presented on potential overpressure zones ....... ,Y,Z/ / J "~- - / /~
32. Seismic anaiysis of shallow gas zones ............. ~.' .N
33. Seabed condition survey (if off-shore) ............ ,/'Y N
34. Contact name/phone for weekly pro~ress reports ..... /.. Y N
[~p~oratory only]
GEOLOGY:
ENGINEERING: COMM~SION:
BEW~.~ 7/"~6 DWJ ~
JDH - -_..~-'~. JDN
TAB~
Comments/Instructions:
HOW/Ij~ - A.%COR~list rev 4/96
Well HistorY File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, informati;3n of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Tue Jul 15 11:13:44 1997
Reel Heade~
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Tape Header
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Scientific Technical
Scientific Technical
Physical EOF
API NUMBE~: ~ 500292067602
OPERATOR: ~%$/ BP EXPLORATION (ALASKA), INC,
LOGGING COMPANY:~' SPERRY-SUN DRILLING SERVICES
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
15-JUL-97
MWD RUN 3 MWD RUN 10 MWD RUN 11
AK-MW-60107 AK-MW-60107 AK-MW-60107
JUSTIN PANTE T.FLYNN T.FLYNN
JESSE NEW MIKE WHITLEY MIKE WHITLEY
JUL 2 5 1997
0~! & Gas Co~s. Commission
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
MWD RUN 12
AK-MW- 60107
T. FLYNN
MIKE WHITLEY
MWD RUN 12
AK-MW-60107
T.FLYNN
MIKE WHITLEY
5
10N
14E
356
137
68.20
66.70
~ GROgND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
40.10
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 7.000 11457.0
6.000 14085.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL DATA IS DOWNHOLE RECORDED.
3. MWD RUNS 1 AND 2 ARE DIRECTIONAL ONLY AND NOT
PRESENTED.
4. SPERRY-SUN'S SERVICES WERE NOT NEEDED DURING RUNS 7,
8, AND 9.
5. X-19B IS REPRESENTED BY MWD RUNS 3, 10, 11. AND 12.
RUN 3 IS
DIRECTIONAL, NATURAL GAMMA RAY/PROBE (NGP),
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4) . RUNS 10, 11, AND 12 ARE
DIRECTIONAL,
NATURAL GAMMA RAY/PROBE (NGP), AND ELECTROMAGNETIC WAVE
RESISTIVITY
PPLASE-4 (EWR4), DUAL GAMMA RAY (DGR) DATA WAS NOT
RELIABLE/GOOD.
6.' A MAD PASS WAS PERFORMED FOR THE ENTIRE HORIZONTAL
SECTION OF THE
BOREHOLE FROM ll400'MD, 8946'TVD TO 14014'MD, 9067'TVD.
RESISTIVITY
DATA ONLY WAS ABLE TO BE ACQUIRED DURING THIS PASS.
7. THERE ARE INTERMITTENT GAPS IN DATA/DATA NOT
AVAILABLE.
8. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS
PER THE E-MAIL
MESSAGE FROM DAVID DOUGLAS FOR MARSHALL DEACON OF BP
EXPLORATION
(ALASKA), INC. ON 10/29/96.
9. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14085'MD,
9081'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED GAMMA RAY.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY {MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME (RESISTIVITY
SENSOR).
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
FET 7898.0 14014.0
RPD 7898.0 14014.0
RPM 7898.0 14014.0
RPS 7898.0 14014.0
RPX 7898.0 14014.0
GR 7898.0 14038.5
ROP 7981.0 14084.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
3 7981.0 11457.0
10 11745.0 12759.0
ll 12759.0 13776.0
12 13776.0 14085.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order
Units Size Nsam Rep
Code Offset Channel
DEPT FT 4 1 68 0 1
RPX MWD OHMM 4 1 68 4 2
RPS MWD OHMM 4 1 68 8 3
RPM MWD OHMM 4 1 68 12 4
RPD MWD OHMM 4 1 68 16 5
FET MWD HOUR 4 1 68 20 6
ROP MWD FT/H 4 1 68 24 7
GR MWD AAPI 4 1 68 28 8
Name Min Max Mean Nsam
DEPT 7898 14084.5 10991.2 12374
RPX 0.642 2000 8.76082 12162
'RPS 0.726 2000 9.82201 12162
First
Reading
7898
7898
7898
Last
Reading
14084.5
14014
14014
RPM 0.171 2000 10.2534 12162
RPD 0.0959 2000 10.8157 12162
FET 0.2985 32.1608 2.40048 11909
ROP 8.96 2226.17 156.111 11437
GR 16.99 291.27 71.7246 11811
7898
7898
7981
7981
7898
14014
14014
14014
14084.5
14038.5
First Reading For Entire File .......... 7898
Last Reading For Entire File ........... 14084.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest
passes.
DEPTH INCREMENT:
FI LE SUMMARY
PBU TOOL CODE
RPD
RPM
RPS
RPX
FET
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
.5000
START DEPTH STOP DEPTH
11400.0 14014.0
11400.0 14014.0
11400.0 14014.0
11400.0 14014.0
11500.0 14014.0
MAD RUN NO. MAD PASS NO.
12
MERGED MAD PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
MERGE TOP
11400.0
MERGE BASE
14014.0
F~ame S~acing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPX MAD OHM~ 4 1 68 4 2
RPS MAD OHMS4 4 1 68 8 3
RPM MAD OHF~4 4 1 68 12 4
RPD MAD OHMM 4 1 68 16 5
FET MAD HOUR 4 1 68 20 6
First
Name Min Max Mean Nsam Reading
DEPT 11400 14014 12707 5229 11400
RPX 0.3124 2000 11.2666 5229 11400
RPS 0.3916 2000 16.0335 5229 11400
RPM 0.1374 2000 26.2231 5229 11400
RPD 0.1331 2000 37.7739 5229 11400
FET 7.6027 80.0098 52.6904 5029 11500
Last
Reading
14014
14014
14014
14014
14014
14014
First Reading For Entire File .......... 11400
Last Reading For Entire File ........... 14014
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUM~4ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 7898.0 11457.0
RPX 7898.0 11457.0
RP'S 7898.0
RPM 7898.0
RPD 7898.0
FET 7898.0
ROP 7981.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP
EWR4
$
11457.0
11457.0
11457.0
11457.0
11457.0
NATURAL GAMMA PROBE
ELECTROMAG. RESIS. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
RENLARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
24-AUG-96
1.32
2.041/5.74/5.46
MEMORY
11457.0
7981.0
11457.0
55.0
63.8
TOOL NUMBER
P0572CR6
P0572CR6
8.500
8.5
LSND-HT
9.90
43.0
8.7
1000
3.8
1.700
.700
1.800
1.700
199.0
.6
Depth Units .......................
Datum Specification Block sub-type..
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD 3 FT/H 4 1 68
GR MWD 3 AAPI 4 1 68
RPX MWD 3 OHMM 4 1 68
RP S MWD 3 OHMM 4 1 68
RPM MWD 3 OHMM 4 1 68
RPD MWD 3 OHMM 4 1 68
FET MWD 3 HOUR 4 1 68
.0
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max Mean
DEPT 7898 11457 9677.5
ROP 12.6 2226.17 186.156
GR 17.22 291.27 95.776
RPX 0.642 270.084 4.39063
RPS 0.726 321.358 4.89082
RPM 0.83 350.182 5.44314
RPD 0.872 415.417 5.41108
FET 0.842 6.837 2.04689
Nsam
7119
6953
7119
7048
7048
7048
7048
6882
First
Reading
7898
7981
7898
7898
7898
7898
7898
7981
Last
Reading
11457
11457
11457
11457
11457
11457
11457
11457
First Reading For Entire File .......... 7898
Last Reading For Entire File ........... 11457
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Conunent Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 10
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 11423.5 12682.0
R~D 11423.5
RPM 11423.5
RPS 11423.5
RPX 11423.5
GR 11693.0
ROP 11747.5
$
LOG HEADER DATA
DATE LOGGED:
S O FTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP
EWR4
$
12682.0
12682.0
12682.0
12682.0
12706.0
12707.0
NATURAL GAMMA PROBE
ELECTROMAG. RESIS. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
07-SEP-96
1.32
2.041/5.74/5.46
MEMORY
12759.0
11745.0
12759.0
87.4
91.9
TOOL NUMBER
P0497SP4
P0497SP4
6.000
6.0
SHEARDRILL
9.10
52.0
8.3
8000
4.1
.200
.000
.400
.600
72.6
.0
A~sent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
DEPT
GR
ROP
RPX
RPS
RPM
RPD
FET
Name Service Order Units Size Nsam Rep
FT 4 1 68
MWD 10 AAPI 4 1 68
MWD 10 FT/H 4 1 68
MWD 10 OHM>4 4 1 68
MWD 10 OHM>4 4 1 68
MWD 10 OHN~4 4 t 68
MWD 10 OHMM 4 1 68
MWD 10 HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max Mean Nsam
DEPT 11423.5 12707 12065.2 2568
GR 20.19 115.43 37.2458 2027
ROP 17.94 954 109.694 1920
RPX 0.3529 2000 24.206 2518
RPS 0.5316 2000 27.7903 2518
RPM 0.171 2000 46.9761 2518
RPD 0.0959 2000 44.4934 2518
FET 0.2985 2.59 1.41047 2363
First
Reading
11423.5
11693
11747.5
11423.5
11423.5
11423.5
11423.5
11501
Last
Reading
12707
12706
12707
12682
12682
12682
12682
12682
First Reading For Entire File .......... 11423.5
Last Reading For Entire File ........... 12707
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 12682.5
RPD 12682.5
RPM 12682.5
RPS 12682.5
RPX 12682.5
GR 12707.0
ROP 12761.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13699.0
13699.0
13699.0
13699.0
13699.0
13724.0
13725.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
09-SEP-96
1.32
2.041/5.74/5.46
MEMORY
13776.0
12759.0
13776.0
87.7
90.3
TOOL NUMBER
P0497SP4
P0497SP4
6.000
6.0
SHEARDRILL
9.10
52.0
8.3
8000
4.2
.200
.000
.400
.600
78.6
.0
M~x frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
DEPT
GR
ROP
RPX
RPS
RPM
RPD
FET
Name Service Order Units Size Nsam Rep
FT 4 1 68
MWD 11 AAPI 4 1 68
MWD 11 FT/H 4 1 68
MWD 11 OHM~ 4 1 68
MWD 11 oPnv~ 4 1 68
MWD 11 OPnV~4 4 1 68
MWD 11 OHMM 4 1 68
MWD 11 HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max Mean Nsam
DEPT 12682.5 13725 13203.8 2086
GR 16.99 208.84 35.7524 2035
ROP 27.58 593.86 105.704 1929
RPX 5.607 21.72 12.5835 2034
RPS 6.1397 24.3577 15.0496 2033
RPM 6.5945 24.079 15.327 2033
RPD 8.3972 23.8641 16.0137 2033
FET 1.0959 14.8056 2.57066 2034
First
Reading
12682.5
12707
12761
12682.5
12683
12683
12683
12682.5
Last
Reading
13725
13724
13725
13699
13699
13699
13699
13699
First Reading For Entire File .......... 12682.5
Last Reading For Entire File ........... 13725
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 12
DEPTH INCREMENT: .5000
FILE SUI~ARY
V~NDOR ~TOOL CODE START DEPTH
FET 11398 5
RPD 11398 5
RPM 11398 5
RPS 11398 5
RPX 11398 5
GR 13720 0
ROP 13767 5
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP
EWR4
$
STOP DEPTH
14014.0
14014.0
14014.0
14014.0
14014.0
14038.5
14084.5
NATURAL GAMMA PROBE
ELECTROMAG. RESIS. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STA/gDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
10-SEP-96
1.32
2.041/5.74/5.46
MEMORY
14085.0
13776.0
14085.0
77.8
89.3
TOOL NUMBER
P0497SP4
P0497SP4
6.000
6.0
SHEARDRILL
9.00
53.0
8.0
9000
4.4
.200
.000
.400
.600
80.0
.0
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 12 AAPI 4 1 68 4 2
RPX MWD 12 OHF~4 4 1 68 8 3
RPS MWD 12 OHMM 4 1 68 12 4
RPM MWD 12 OHM~ 4 1 68 16 5
RPD MWD 12 OHMS4 4 1 68 20 6
FET MWD 12 HOUR 4 1 68 24 7
ROP MWD 12 FT/H 4 1 68 28 8
First
Name Min Max Mean Nsam Reading
DEPT 11397.5 14084.5 12741 5375 11397.5
GR 18.57 97.1 26.9812 638 13720
RPX 0.3124 2000 11.3087 5232 11398.5
RPS 0.3916 2000 16.078 5234 11397.5
RPM 0.1374 2000 26.2473 5233 11398
RPD 0.1331 2000 38.5491 5233 11398
FET 0.7565 48.4103 32.3138 2510 12759.5
ROP 8.96 689.69 120.608 635 13767.5
Last
Reading
14084.5
14038.5
14014
14014
14014
14014
14014
14084.5
First Reading For Entire File .......... 11397.5
Last Reading For Entire File ........... 14084.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER: 7
RAW MAD
Curves and log header data for each pass of each run in separate files.
DEPTH INCREMENT: .5000
MAD RUN NUMBER: 12
MAD PASS NUMBER:
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
RPD 11400.0 14014.0
RPM 11400.0 14014.0
RPS 11400.0 14014.0
RPX 11400.0 14014.0
FET 11500.0 14014.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHF94) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
10-SEP-96
1.32
2.041/5.74/5.46
MEMORY
14085.0
13776.0
14085.0
77.8
89.3
TOOL NUMBER
P0497SP4
6.000
6.0
SHEARDRILL
9.00
53.0
8.0
9000
4.4
.200
.000
.400
.600
80.0
.0
Max frames per ~ecord ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name
DEPT
RPX
RPS
RPM
RPD
FET
Service Order Units Size Nsam Rep
FT 4 1 68
MAD 12 OHM~ 4 1 68
MAD 12 OHM~ 4 1 68
MAD 12 OHM>4 4 1 68
MAD 12 OHM~ 4 1 68
MAD 12 HOUR 4 1 68
Code
Offset
0
4
8
12
16
20
Channel
1
2
3
4
5
6
Name Min Max Mean
DEPT 11400 14014 12707
RPX 0.3124 2000 11.2666
RPS 0.3916 2000 16.0335
RPM 0.1374 2000 26.2231
RPD 0.1331 2000 37.7739
FET 7.6027 80.0098 52.6904
Nsam
5229
5229
5229
5229
5229
5029
First
Reading
11400
11400
11400
11400
11400
11500
Last
Reading
14014
14014
14014
14014
14014
14014
First Reading For Entire File .......... 11400
Last Reading For Entire File ........... 14014
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Scientific Technical
Scientific Technical
Physi'cal EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
Tue Jul 15 08:58:32 1997
yo 7
Reel Header
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Tape Header
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (PT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
MWD RUN 3
AK-MW-60107
JUSTIN PANTE
JESSE NEW
X-19B PB1
500292067670
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
15-JUL-97
MWD RUN 3
AK-MW-60107
JUSTIN PANTE
JESSE NEW
5
10N
14E
356
137
68.20
66.70
40.10
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
2~D ST~ING
3RD STRING
PRODUCTION STRING
REMARKS:
7.000 11475.0
8.500 11880.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL DATA IS DOWNHOLE RECORDED.
3. MWD RUNS 1 AND 2 ARE DIRECTIONAL ONLY AND NOT
PRESENTED.
4. X-19B PB1 IS REPRESENTED BY MWD RUN 3 WHICH IS
DIRECTIONAL, NATURAL
GAMMA RAY/PROBE (NGP), AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4
(EWR4). THERE ARE INTERMITTENT GAPS IN RESISTIVITY
DATA/DATA NOT
AVAILABLE. DUAL GAMMA RAY (DGR) DATA WAS NOT
RELIABLE/GOOD.
5. A MAD PASS WAS PERFORMED FROM 11425.50'MD, 8959'TVD
TO 11774'MD, 9128'TVD.
THIS DATA CONTAINS ELECTROMAGNETIC WAVE RESISTIVITY
PHASE-4 (EWR4) ONLY.
6. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS
PER THE E-MAIL
MESSAGE FROM DAVID DOUGLAS FOR MARSHALL DEACON OF BP
EXPLORATION
(ALASKA), INC. ON 10/29/96.
7. THIS WELL REACHED A TOTAL DEPTH (TD) OF l1880'MD,
9174'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED GAMMA RAY.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME (RESISTIVITY
SENSORS).
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEJkDER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 7898.0
RPX 7898.0
RPS 7898.0
RPM 7898.0
STOP DEPTH
11797.5
11774.5
11774.5
11774.5
FET 7898.0
ROP 7981.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
11774.5
11774.5
11879.5
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
3 7981.0 11880.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD AAPI 4 1 68
ROP MWD FT/H 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHNIM 4 1 68
FET MWD HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max Mean Nsam
DEPT 7898 11879.5 9888.75 7964
GR 17.22 309.75 90.7899 7800
ROP 12.6 2226.17 192.371 7798
RPX 0.6422 2000 5.23969 7683
RPS 0.6226 2000 6.63709 7683
RPM 0.2699 2000 7.18709 7683
RPD 0.2159 2000 6.56555 7683
FET 0.8425 6.8374 1.9886 7517
First
Reading
7898
7898
7981
7898
7898
7898
7898
7981
Last
Reading
11879.5
11797.5
11879.5
11774.5
11774.5
11774.5
11774.5
11774.5
First Reading For Entire File .......... 7898
Last Reading For Entire File ........... 11879.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
M~ximu~ Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest
passes.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
FET
RPD
RPM
RPS
RPX
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
11425.5 11774.0
11425.5 11774.0
11425.5 11774.0
11425.5 11774.0
11425.5 11774.0
MAD RUN NO. MAD PASS NO. MERGE TOP
3 11425.5
MERGED MAD PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
11774.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPX MAD OHMM 4 1 68 4 2
RPS MAD OHF~ 4 1 68 8 3
RPM MAD OHMM 4 1 68 12 4
RPD MAD OHMM 4 1 68 16 5
FET MAD HOUR 4 1 68 20 6
Name Min Max Mean Nsam
DEPT 11425.5 11774 11599.8 698
RPX 1.0287 2000 21.1047 698
RPS 0.3265 2000 24.5298 698
RPM 0.188 2000 30.566 698
RPD 0.1108 2000 35.0827 698
FET 0.6263 7.9152 2.67263 698
First
Reading
11425.5
11425.5
11425.5
11425.5
11425.5
11425.5
Last
Reading
11774
11774
11774
11774
11774
11774
First Reading For Entire File .......... 11425.5
Last Reading For Entire File ........... 11774
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUFmL~RY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 7898.0 11774.5
RPD 7898.0 11774.5
RPM 7898.0 11774.5
RPS 7898.0 11774.5
RPX 7898.0 11774.5
GR 7898.0 11797.5
ROP 7981.0 11879.5
$
LOG HEADER DATA
DATE LOGGED: 24-AUG-96
SOFTWARE
SURFACE SOFTWARE VERSION: 1.32
DOWNHOLE SOFTWARE VERSION: 2.041/5.74/5.46
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 11880.0
TOP LOG INTERVAL (FT) : 7981.0
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
11880.0
55.0
63,8
TOOL NUMBER
P0572CR6
P0572CR6
8.500
8.5
LSND-HT
9.90
43.0
8.7
1000
3.8
1.700
.700
1.800
1.700
199.0
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 3 FT/H 4 1 68 4 2
GR MWD 3 AAP I 4 1 68 8 3
RPX MWD 3 OHMM 4 1 68 12 4
RPS MWD 3 OHMM 4 1 68 16 5
RPM MWD 3 OHMM 4 1 68 20 6
RPD MWD 3 OHM>4 4 1 68 24 7
FET MWD 3 HOUR 4 1 68 28 8
Name Min Max Mean Nsam
DEPT 7898 11879.5 9888.75 7964
ROP 12.6 2226.17 192.371 7798
GR 17.22 309.75 90.7899 7800
RPX 0.6422 2000 5.23969 7683
RPS 0.6226 2000 6.63709 7683
RPM 0.2699 2000 7.18709 7683
RPD 0.2159 2000 6.56555 7683
FET 0.8425 6.8374 1.9886 7517
First
Reading
7898
7981
7898
7898
7898
7898
7898
7981
Last
Reading
11879.5
11879.5
11797.5
11774.5
11774.5
11774.5
11774.5
11774.5
First Reading For Entire File .......... 7898
Last Reading For Entire File ........... 11879.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Coraraent Record
FILE HF2~DE R
FILE NUMBER: 4
RAW MAD
Curves and log header data for each pass of each run in separate files.
DEPTH INCREMENT: .5000
MAD RUN NUMBER: 3
MAD PASS NUMBER:
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 11425 . 5 11774 . 0
RPD 11425.5 11774 . 0
RPM 11425 . 5 11774 . 0
RPS 11425 . 5 11774 . 0
RPX 11425 . 5 11774 . 0
$
LOG HEADER DATA
DATE LOGGED: 24-AUG- 96
SOFTWARE
SURFACE SOFTWARE VERSION: 1.32
DOWNHOLE SOFTWARE VERSION: 2.041/5.74/5.46
DATA TYPE {MEMORY OR RF2LL-TIME): MEMORY
TD DRILLER (FT) : 11880.0
TOP LOG INTERVAL (FT) : 7981.0
B~TTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE A~D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMS4) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
11880.0
55.0
63.8
TOOL NUMBER
P0572CR6
8.500
8.5
LSND-HT
9.90
43.0
8.7
1000
3.8
1.700
.700
1.800
1.700
199.0
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPX MAD 3 OHMM 4 1 68 4 2
RPS MAD 3 OHM>4 4 1 68 8 3
RPM MAD 3 OHM~ 4 1 68 12 4
RPD MAD 3 OHMM 4 1 68 16 5
FET MAD 3 HOUR 4 1 68 20 6
First
Name Min Max Mean Nsam Reading
DEPT 11425.5 11774 11599.8 698 11425.5
Last
Reading
11774
RPX 1.0287 2000 21.1047 698
RPS 0.3265 2000 24.5298 698
RPM 0.188 2000 30.566 698
RPD 0.1108 2000 35.0827 698
FET 0.6263 7.9152 2.67263 698
11425.5
11425.5
11425.5
11425.5
11425.5
11774
11774
11774
11774
11774
First Reading For Entire File .......... 11425.5
Last Reading For Entire File ........... 11774
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Scientific Technical
Scientific Technical
Physical EOF
Physical EOF
End Of LIS File