Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-171MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, May 14, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Guy Cook P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 04-49 PRUDHOE BAY UNIT 04-49 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 05/14/2025 04-49 50-029-22713-00-00 196-171-0 W SPT 8487 1961710 2122 1262 215 OTHER F Guy Cook 4/13/2025 MITIA to maximum anticipated injection pressure for diagnostics. Well under evaluation for IA re-pressurization. The well started injecting at the approxiamate pressure of 2300 psi. 10.4 bbls away and never achieved test pressure. The well will be freeze protected and shut in today. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 04-49 Inspection Date: Tubing OA Packer Depth 280IA 45 Min 60 Min Rel Insp Num: Insp Num:mitGDC250412190923 BBL Pumped:10.4 BBL Returned:1.5 Wednesday, May 14, 2025 Page 1 of 1 9 9 9 9 9 9 9 99 9 9 9 F 10.4 bbls away and never achieved test pressure shut in today James B. Regg Digitally signed by James B. Regg Date: 2025.05.14 11:44:42 -08'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Sea Water Injector 04-49 (PTD 1961710) failed AOGCC MIT-IA Date:Tuesday, April 15, 2025 8:28:00 AM Attachments:04-49.pdf From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Monday, April 14, 2025 5:48 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: NOT OPERABLE: Sea Water Injector 04-49 (PTD 1961710) failed AOGCC MIT-IA Mr. Wallace, DHD performed a passing PPPOT-T and PPPOT-IC on 04/10/25. On 04/13/25 an AOGCC witnessed MIT-IA failed with a LLR ~0.4 bpm @ 2,300 psi. The well was subsequently shut-in and freeze protected. It will now be classified as NOT OPERABLE until the barriers are restored. Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 From: PB Wells Integrity Sent: Wednesday, April 9, 2025 10:12 AM To: chris.wallace@alaska.gov Cc: Regg, James B (CED) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Sea Water Injector 04-49 (PTD 1961710) anomalous IA re- pressurization Mr. Wallace, Sea Water Injector 04-49 (PTD #1961710) had an IA pressure bleed on 03/28/25. Since that bleed, the IA pressure has steadily climbed and does not appear to be due to any thermal or injection rate effects. The well will now be classified as UNDER EVALUATION and is on the 28-day clock for diagnostics. Plan forward: 1. DHD: PPPOT-T/PPPOT-IC 2. Fullbore: AOGCC witnessed MIT-IA 3. Well Integrity: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. FMC V113LFEAD= CMO ACTUATOR = BAKER KB. ELEV = 66' BF. ELEV = ? KOP= 1879 Max Angle = 94" a 11052' Datum MD= 10974' Datum TVD= 8800'SS Minimum ID = .40" @ 9523' 4-1/2" X-LOCK CHOKE 7-5/8" CSG, 29.7#, L-80, D = 6.875" 949T 4-1/2" TBG, 12.6#, 13CR -0152 bpf, D = 3.958" 9644' SAND PLUG (03/18/02) 9842' TOP OF 4-1/2" LNR 10293' - 7-5/8" CSG, 29.7#, 13CR ID = 6.875" H 10300' 114-1 /2" LNR-PORT, 12.6#, L-80, .0152 bpf, D = 3.958" 1-1 10461' 04-49 101 4-1 /2" LNR 12-6#, L-80, 0.0152 bpf, D = 3.958" 10466' 1 IIITIII PERFORATION SUMMARY REF LOG: BHCS ON 11/22/96 ANGLE AT TOP PERF: 55" @ 9763' Note: Refer to Roduction DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-318" 6 9673 - 9690 O 04/28/03 2-718" 6 9698 - 9758 O 09/01/01 3-3/8" 6 9763 - 9785 O 04/18/03 3-318" 4 10065 - 10120 C OB/29/99 3-318" 4 10145 - 10165 C 08/23/99 3-378" 4 10224-10280 C 02/17/97 3-3/8" 6 10390 - 10420 C 04/28/98 4-12" SLOT 10456 - 11111 SLTD 12/04/96 3-378" 6 10550 - 10581 C 04/28/98 3-3/8" 6 10740 - 10771 C 04/28/98 3-318" 6 10830 - 1 OB61 C 04/28/98 SAFETY NOTES: H2S OVER 300 PPM, CHROME 4- 12- TM 7S/8- CSG - HORIZ WELL, 70- @ 10037'. 49C —I4-1/2" CAMCO SSSV LANDING NIP, ID = 3.812" GAS LIFT MANDRELS 1 3148 3047 32 KBG-2-LS DV INT 0825101 2 5759 5268 32 KBG-2-LS DV INT 0825101 3 7262 6570 31 KBG-2-LS DV INT 12104/96 4 8185 7361 33 KBG-2-LS DV INT 12/04/96 5 8786 7865 30 KBG-2-LS DV INT 12/04/96 6 9431 8431 34 KBG-2-LS DV INT 0825/01 { 9499' —j7-5/8" X 4-1/2" TNV HBBP-T PKR 9623' 4-1/2" HES X NP, D = 3.813" 9523' 4-12' X-LOCK w /DH CHOKE, D = .40- BEAN (01/06118) 9644' 4-12" vA-EG, D = 3.958" ETMD TT LOGGED 02/10/97 10293' 7-518" X 4-1/2" TIW SSH LNR TOP PKR 10306' 4-1/2" HES X LANDING 10319' Tw MLAS, D=3.85"-L=29' 1�04b� 4-1/2" NO-GO MLL® 01/13/98. D = 3.65" I I I I I�JI I I I PBTD 11025' 2 bpf, 4-1/2" LNR 12.6#, L-B0,015D11138' DATE REV BY COMMENTS DATE REV BY COMMENTS 12/04/96 ORIGINAL COMPLETION 10/31/00 SIS-IH CONVERTED TO CANVAS 1/82001 SISLG REVISION 01/07/02 RNITP CORRECTIONS 0428/03 BNVTP ADD PERFS 01/08/17 BSE/JMD SET DHCHOKE 01/06/18 PRUDHOE BAY UNIT WELL:04-49 PERMIT N0: 1961710 API No: 50-029-22713-00 Hilcorp North Slope, LLC WIN-ai m plaa Tubing —pu • &eM k OpxeNe } Nat 0', ♦ Uwer E"I an. IA —� Men. OA Men. MA ♦ Men. 000P O Man. mN CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: Sea Water Injector 04-49 (PTD 1961710) anomalous IA re-pressurization Date:Wednesday, April 9, 2025 10:47:23 AM Attachments:04-49.pdf From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Wednesday, April 9, 2025 10:12 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Sea Water Injector 04-49 (PTD 1961710) anomalous IA re- pressurization Mr. Wallace, Sea Water Injector 04-49 (PTD #1961710) had an IA pressure bleed on 03/28/25. Since that bleed, the IA pressure has steadily climbed and does not appear to be due to any thermal or injection rate effects. The well will now be classified as UNDER EVALUATION and is on the 28-day clock for diagnostics. Plan forward: 1. DHD: PPPOT-T/PPPOT-IC 2. Fullbore: AOGCC witnessed MIT-IA 3. Well Integrity: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. WIN-ai m plaa Tubing —pu • &eM k OpxeNe } Nat 0', ♦ Uwer E"I an. IA —� Men. OA Men. MA ♦ Men. 000P O Man. mN FMC V113LFEAD= CMO ACTUATOR = BAKER KB. ELEV = 66' BF. ELEV = ? KOP= 1879 Max Angle = 94" a 11052' Datum MD= 10974' Datum TVD= 8800'SS Minimum ID = .40" @ 9523' 4-1/2" X-LOCK CHOKE 7-5/8" CSG, 29.7#, L-80, D = 6.875" 949T 4-1/2" TBG, 12.6#, 13CR -0152 bpf, D = 3.958" 9644' SAND PLUG (03/18/02) 9842' TOP OF 4-1/2" LNR 10293' - 7-5/8" CSG, 29.7#, 13CR ID = 6.875" H 10300' 114-1 /2" LNR-PORT, 12.6#, L-80, .0152 bpf, D = 3.958" 1-1 10461' 04-49 101 4-1 /2" LNR 12-6#, L-80, 0.0152 bpf, D = 3.958" 10466' 1 IIITIII PERFORATION SUMMARY REF LOG: BHCS ON 11/22/96 ANGLE AT TOP PERF: 55" @ 9763' Note: Refer to Roduction DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-318" 6 9673 - 9690 O 04/28/03 2-718" 6 9698 - 9758 O 09/01/01 3-3/8" 6 9763 - 9785 O 04/18/03 3-318" 4 10065 - 10120 C OB/29/99 3-318" 4 10145 - 10165 C 08/23/99 3-378" 4 10224-10280 C 02/17/97 3-3/8" 6 10390 - 10420 C 04/28/98 4-12" SLOT 10456 - 11111 SLTD 12/04/96 3-378" 6 10550 - 10581 C 04/28/98 3-3/8" 6 10740 - 10771 C 04/28/98 3-318" 6 10830 - 1 OB61 C 04/28/98 SAFETY NOTES: H2S OVER 300 PPM, CHROME 4- 12- TM 7S/8- CSG - HORIZ WELL, 70- @ 10037'. 49C —I4-1/2" CAMCO SSSV LANDING NIP, ID = 3.812" GAS LIFT MANDRELS 1 3148 3047 32 KBG-2-LS DV INT 0825101 2 5759 5268 32 KBG-2-LS DV INT 0825101 3 7262 6570 31 KBG-2-LS DV INT 12104/96 4 8185 7361 33 KBG-2-LS DV INT 12/04/96 5 8786 7865 30 KBG-2-LS DV INT 12/04/96 6 9431 8431 34 KBG-2-LS DV INT 0825/01 { 9499' —j7-5/8" X 4-1/2" TNV HBBP-T PKR 9623' 4-1/2" HES X NP, D = 3.813" 9523' 4-12' X-LOCK w /DH CHOKE, D = .40- BEAN (01/06118) 9644' 4-12" vA-EG, D = 3.958" ETMD TT LOGGED 02/10/97 10293' 7-518" X 4-1/2" TIW SSH LNR TOP PKR 10306' 4-1/2" HES X LANDING 10319' Tw MLAS, D=3.85"-L=29' 1�04b� 4-1/2" NO-GO MLL® 01/13/98. D = 3.65" I I I I I�JI I I I PBTD 11025' 2 bpf, 4-1/2" LNR 12.6#, L-B0,015D11138' DATE REV BY COMMENTS DATE REV BY COMMENTS 12/04/96 ORIGINAL COMPLETION 10/31/00 SIS-IH CONVERTED TO CANVAS 1/82001 SISLG REVISION 01/07/02 RNITP CORRECTIONS 0428/03 BNVTP ADD PERFS 01/08/17 BSE/JMD SET DHCHOKE 01/06/18 PRUDHOE BAY UNIT WELL:04-49 PERMIT N0: 1961710 API No: 50-029-22713-00 Hilcorp North Slope, LLC CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Injector 04-49 (PTD #1961710) OA pressure bleed Date:Wednesday, February 5, 2025 4:45:59 PM Attachments:04-49.pdf From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Wednesday, February 5, 2025 4:28 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: Injector 04-49 (PTD #1961710) OA pressure bleed Mr. Wallace, Injector 04-49 (PTD #1961710) has had two OA pressure bleeds in the last three months. The OA has an open shoe and does not equalize with the IA pressure so it is not clear if the OA pressure increase is from formation fluids recharging the OA or if the well has IAxOA communication. Our plan is to increase the IA pressure with nitrogen and see if the OA pressure tracks. If we determine the well has IAxOA communication, we will make Under Evaluation and notify you. Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. tltlI: GB zm zro zw zw zw zw zm 310 TIO Plot W t cubing 0 Stunt ea ♦ + xwoPee "OW 55_ Iw ♦ Era' Mon. I IN ' Mon. In �ln--Wn.OL Mon.COA to—♦—Men.000G M O Men.WHI p FMC VMELLFEAD= CNV ACTUATOR = BAKER KB. ELEV = 66' BF. ELEV = ? KOP= 1879 Max Angle = 94" @ 11057 Datum MD= 10974' Datum TVD= 8800'SS Minimum ID = .40" @ 9523' 4-112" X-LOCK CHOKE 7-5/8" CSG, 29.74, L-80, D = 6.875" 949T 4-1/2" TBG, 12.6#, 13CR -0152 bpf, D = 3.958" 96" SAND PLUG (03/18/02) 9842' TOP OF 4-1/2" LNR 10293' - 7-5/8" CSG, 29.7#, 13CR ID = 6.875" H 10300' II4-1/2" LNR-PORT, 12.6#, L-80, .0152 bpf, D = 3.958" I--1 10451' r SAFETY NOTES: H2S OVER 300 PPM, CHROME 4- 0449 12-TM7S/8-CSG-HORIZWELL, 70-@10037'. 1e1 4-1 /2" LNR 12-6#, L-80, 0.0152 bpf, D = 3.958" 10458' 1 III�I� PERFORATION SLMM4RY REF LOG: BHCS ON 11/22/96 ANGLEATTOP P8iF: 55" Q 9763' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-318" 6 9673 - 9690 O 04/2B/03 2a/8" 6 9698 - 9758 O 09/01/01 3-318" 6 9763 - 9785 O 04/18/03 3-318" 4 10065 - 10120 C 08/29/99 3-3/8" 4 10145 - 10165 C 08/23/99 3-318" 4 10224-10280 C 02/17/97 3-3/8" 6 10390 - 10420 C 04/26/98 4-12" SLOT 10456 - 11111 SLTD 12/04/96 3-318" 6 10550 - 10581 C 04/28/98 3-3/8" 6 10740 - 10771 C 04/28/98 3-3/8" 6 10830 - 10861 C 04/28/98 49,V —j4-1/2" CAMOO SSSV LANDING NIP, ID= 3.812" GAS LFT MANDRELS 1 3148 3047 32 KBG-2-LS DV NT 0825/01 2 5759 5268 32 KBG-2-LS DV NT 0825/01 3 7262 6570 31 KBG-2-LS DV NT 12/04/96 4 8185 7361 33 KBG-2-LS DV NT 12/04/96 5 8786 7865 30 KBG-2-LS DV MT 12/04/96 6 9431 8431 34 KBG-2-LS DV NT 0825/01 9499' H 7-5/8" X 4-12" TIW HBBP-T PKR 9623' 4-1/2" HES X NP, D = 3.813" 9523' 4-12' X-LOCK w /DH CHOKE, D = .40" BEAN (01/06/18) 9644' 4-12" WLEG, D = 3.958- 9646' ELMD TT LOGGED 02/10/97 10293' 7-5/8" X 4-12" TIW SSH LNR TOP PKR 10306' 4-12" HES X LANDING 10319' TM/ MLA S, 1)=3.85"-L=29' 1�46� 4-1 /2" NO-GO MLL® 01113/98. D = 3.65" I I I I I F� I I�JI I I I I t�I PBTD 11025' 4-1/2" LNR 12.6#, L-80, .0152 bpf, D= 3.958" 11138' DATE REV BY COMMENTS DATE REV BY COMMENTS 12/04/96 ORIGINAL COMPLETION 10/31/00 SIS-IH CONVERTED TO CANVAS 1/82001 SIS-LG REVISION 01/07/02 RWrP CORRECTIONS 0428/03 BM/TP ADD PERFS 01/08/17 BSE/JMD SET DHCHOKE 01/06/18 PRUDHOE BAY UNIT WELL:'04-49 PERMIT No: 1961710 API No: 50-029-22713-00 Hilcorp North Slope, LLC MEMORANDUM TO: Jim Regg —� P.I. Supervisor Q, FROM: Adam Earl Petroleum Inspector Well Name PRUDHOE BAY UNIT 04-49 IInsp Num: mitAGE220124094249 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, January 24, 2022 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC 04-49 PRUDHOE BAY UNIT 0449 Src: Inspector Reviewed By: P.I. Supry Comm API Well Number 50-029-22713-00-00 Inspector Name' Adam Earl Permit Number: 196-171-0 Inspection Date: 1/23/2022 - Packer Well 0449 Type Inj a TVD PTD 1961710 Tye Test SPT -Test psi BBL Pumped: I'I 2.5 BBL Returned: Interval 4YRTST P/F --- - E-- -- --- - J - - Notes: MIT IA Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min 8487 - • Tubing 1426 - 1426 - 1425 - 1425 2122 IA 35 2496 - 2444 2427 - 2.6 " OA 193 508 506. 495 - P - Monday, January 24, 2022 Page I of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission z/ /i 6 DATE: Tuesday,February 06,2018 TO: Jim Regg P.I.Supervisor SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. 04-49 FROM: Jeff Jones PRUDHOE BAY UNIT 04-49 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry "J44-- NON-CONFIDENTIAL NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 04-49 API Well Number 50-029-22713-00-00 Inspector Name: Jeff Jones Permit Number: 196-171-0 Inspection Date: 1/16/2018 Insp Num: mitJJ180116201056 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 04-49yp J I g - T e In' w� TVD 8487 - Tubing� 17s9 • 1790 1788 1789 PTD 1961710 - Type Test SPT Test psi 2122 - IA 1 2502 2468- 2458 BBL Pumped: 3.2 BBL Returned: 2.5 , OA 164 , 446 - 450 449 Intervale 4YRTST P/F P - Notes: 1 well inspected,no exceptions noted. SCANNEDr, Tuesday,February 06,2018 Page 1 of 1 • 11110 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,January 17,2018 TO: Jim Regg r P.I.Supervisoi(1 () (1 SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. 04-49 FROM: Jeff Jones PRUDHOE BAY UNIT 04-49 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 04-49 API Well Number 50-029-22713-00-00 Inspector Name: Jeff Jones Permit Number: 196-171-0 Inspection Date: 1/16/2018 Insp Num: mitJJ180116201056 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 04-49 Type Inj ®TVD 8487 ` Tubing 1789 ' 1790 — 1788" 1789 ' PTD 1961710 Type Test SPT Test psi 2122 ' IA 1 2502 2468 - 2458 BBL Pumped: 3.2 BBL Returned: 3.2 ' OA 164 446 - 450 . 449 • IntervalT 4YRTST P/F P Notes: 1 well inspected,no exceptions noted. SCANNED , Wednesday,January 17,2018 Page 1 of 1 ) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor ~ J,' v "h.e¿ý l 'if 13ICC DATE: Wednesday, August 17,2005 SUBJECT: Mechanical Integrity Tests SP EXPLORA nON (ALASKA) INC 04-49 PRUDHOE SAY UNIT 04-49 '. / \11 ,£\tr FROM: Chuck Scheve Petroleum Inspector Src: [nspector Reviewed By: P.I. Suprv ~£... Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UNIT 04-49 Insp Num: mitCS050816132816 Rei Insp Num: API Well Number: 50-029-22713-00-00 Permit Number: 196-171-0 Inspector Name: Chuck Scheve Inspection Date: 8/16/2005 Packer __Well ___~~~~~;~p_~inj·l w I TVD , P.T.__,~9617101'!.rpeT~~! I SPT ¡Test psi Jµterval ,,~~TST _ " P/F ___,~___ Depth Pretest 8487 I IA-"i50û'-'-- i --'2-12i~--¡-OA! 280 _____ I +. __ _____'!'~_~ing I 1700 Initial 15 Min. 30 Min. 45 Min. 60 Min. 2500 ----r-- 2470 i 2460 ¡----------¡-----.- ---"------'--¡-s--------L-----------~,------I-----.-------- 1'7~: ¡--¡'7:0 1~00J=_ -- i~-= Notes: The pretest pressures were observed for 30+ minutes and found stable ,-' l"'" "~I"~ "'. 'I ~ì" Q [t":. GO') (' C 'Ii) (":Þ,,, "1 ') 0 O~) It) ~ ~J~~~ i) '3 tç..t.. ,~) [... ~ .... "-. -' Wednesday, August 17,2005 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X Plugging_ Perforate _X SBG / ADD PERFS Pu, tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 5. Type of Well: Development __ Exploratory__ Stratigraphic__ Service__X 4. Location of well at surface 4969' FNL, 4896' FEL, Sec. 26, T11 N, R15E, UM At top of productive interval 2800' FNL, 1343' FEL, Sec. 26, T11N, R15E, UM At effective depth 2673' FNL, 1601' FEL, Sec. 26, T11 N, R15E, UM At total depth 3396' FNL, 567' FEL, Sec. 26, T11N, R15E, UM (asp's 713202, 5952193) (asp's 716692, 5954463) (asp°s 716430, 5954583) (asp's 717484, 5953890) 6. Datum elevation (DF or KB feet) RKB 66 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 04-49 9. Permit number / approval number 196-171 10. APl number 50-029-22713-00 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11138 feet Plugs (measured) 8844 feet Tagged Sand Back @ 9842' (03/18/2002) Effective depth: measured true vertical 9842 feet Junk (measured) 8712 feet Casing Length Conductor 110' Surface 4036' Intermediate 10268' Slotted Liner 845' Size Cemented Measured Depth True Vertical Depth 20" 260 sx AS 142' 142' 10-3/4" 3000 sx CS III, 390 sx 4068' 3820' Class 'G' 7-5/8" 850 sx Class 'G' 10300' 8852' 4-1/2" Uncemented 10293' - 11138' 8850' - 8844' Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) Open Perfs 9673'-9690', 9698'-9758', 9763'-9785', 10065'-10120', 10145'-10165', Open Perfs (continued) 10224'-10280', 10390'-10421 ', Slotted Liner Interval 10456' - 11111'. Slotted Liner Perf'd Intervals 10550'-10581 ', 10740'-10771 ', 10830'-10861' Open Perfs 8616'-8626', 8631'-8666', 8669'-8681', 8803'-8820', 8828'-8833', Open Perfs (continued) 8843'-8849', 8851'-8850'. Slotted Liner Interval 8849'- 8846'. Slotted Liner Perf'd Intervals 8847'-8847', 8848'-8849', 8850'-8851'. 4-1/2", 12.6#, 13-CR, Tubing @ 9499'. 4-1/2", 12.6#, 13-CR, Tubing Tail @ 9544'. 7-5/8" x 4-1/2" TIW HBBP-T PKR @ 9499'. 7-5/8" x 4-1/2" TI~i~'"~F~iy"~ 10293'. 4-1/2" Camco sssv Landing Nipple @ 494'. 13. Stimulation or cement squeeze summary J Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure Alaska 0il 14. Representative Daily Average Production or Injection Data Prior to well operation 04/27/2003 Subsequent to operation 05/04/2003 OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 7539 27348 Tubing Pressure 1868 2374 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil __ Gas _ Suspended __ Service Water Iniection 17. I hereby certify that the foregoing.,'~4r/~u~ and corm. tr.;Lo,the best of my knowledge. D )W_~~R~ _~¢.~~~'~ Title: Techical Assistant e ayne . ~c norr ,, i,,,r.', ",'.- ' ;;;','~;~"~ ............. '"'-~" '~' ' Form 10-404 ~evlvlv~/~-L~'' ~JUL (} ~ 200~ ORI61NAL Date Mav 05, 2003 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE 03/07/2O03 03/07/2OO3 03/09/2003 03/12/2003 04/18/2OO3 04/27/2OO3 04/28/2003 O5/O4/2OO3 O3/O7/O2 03/07/03 03/09/03 03/12/03 04/18/O3 O4/27/O3 04/28/03 05/04/03 04-49 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PERFORATING: PERFORATING: PERFORATING: PERFORATING: PERFORATING: PERFORATING: PERFORATING: TESTEVENT --- 27,348 BWPD DRIFT/TAG LOAD WELL TO SECURE SCFvlOO-B-GONE DRIFT/TAG PERFORATING sCrvlOO-B-GONE PERFORATING INJECTION PRESSURE, PSI: 2,374 TYPE: PW VOLUME: EVENT SUMMARY DRIFT W/3 3/8" DUMMY GUN. UNABLE TO LOC TT. SET DOWN @ 9707'SLM - TARGET DEPTH WAS 9785'. BAILER HAD INJ. SCHMOO. TURN WELL OVER TO DSO. WELL CAN BE PUT BACK ON INJECTION. SCHMOO BE GONE ASSIST SLICK-LINE, PUMP 15 BBLS 60/40 MEOH FOR FREEZE PROTECT. SCHMOO-B-GONE. PUMPED 192 BBLS. SBG TREATMENT. ***WELL INJECTING ON ARRIVAL*** DRIFT W/3 3/8 DG,TEL,SB. LOC TT @ 9525' SLM + 21'= 9547' ELMD. TAG BOTTOM @ 9847' SLM + 21'= 9862' ELMD (SB FULL OF SMOO). PERFORATED FROM 9763' - 9785' MD IN TWO RUNS USING 3-3/8" HSD PJ- 3406 HMX 5-SPF PURE GUNS REF SWS TRIPLE COMBO 11-22-96. HAD TO WORK DOWN TO FIRST SHOT DEPTH. EVENTUALLY FELL THROUGH SCHMOO. DID NOT TAG TD. PUT WELL BACK ON INJECTION, NOTIFIED DSO OF WELL STATUS. PUMPED 5 BBLS METHANOL, FOLLOWED BY 150 BBLS SBG DOWN TUBING. FREEZE PROTECT WITH 5 BBLS METHANOL. PERFORATED FROM 9673'-9690' W/3 3/8" PURE GUNS. TWO RUNS MADE WITH 8.5' ON EACH GUN. GUN #1 INTERVAL 9681.5'-9690'. CCL STOP DEPTH 9663.8', CCL TO TOP SHOT 17.7'. GUN #2 INTERVAL 9673'-9681.5'. CCL STOP DEPTH 9655.3'. ALL SHOTS FIRED. DID NOT TAG TD. <<< DSO TO RETURN WELL TO INJECTION. >>> TESTEVENT--- INJECTION PRESSURE, PSI: 2,374 TYPE: PW VOLUHE: 27,348 BWPD Page 1 04-49 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS FLUIDS PUMPED BBLS 3 PRESSURE TEST LUBRICATOR TO 3000 PSI W/1 BBL OF DIESEL. 2 TESTS 20 NEAT METHANOL 15 60/40 METHANOL WATER 160 FRESH WATER 182 SBG CONCENTRATE 380 TOTAL ADD PERFS 04/18 & 28/2003 THE FOLLOWING INTERVALS WERE PERFORATED USING 3-3/8" HSD PJ-3406 HMX 5 SPF 'PURE GUNS SYSTEM'. 9673'-9690' 9763'-9785' Page 2 STATE OF ALASKA /?'~i'. ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: SAND BACK/ACIDIZE Operation shutdown_ Stimulate _X Pull tubing _ Alter casing _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 4969' FNL, 4896' FEL, Sec. 26, T11 N, R15E, UM At top of productive interval 2800' FNL, 1343' FEL, Sec. 26, T11N, R15E, UM At effective depth 2673' FNL, 1601' FEL, Sec. 26, T11 N, R15E, UM At total depth 3396' FNL, 567' FEL, Sec. 26, T11N, R15E, UM 12. Present well condition summary Total depth: measured true vertical 5. Type of Well: Development __ Explorato~__ Stratigraphic__ Service__X (asp's 713202, 5952193) (asp's 716692, 5954463) (asp's 716430, 5954583) (asp's 717484, 5953890) 11138 feet Plugs (measured) 8844 feet Plugging _ Perforate _ Repair well ,'::i,i;!!.C!~:; ~:J, i ~tl~er _,X~,. ,' 6. Datum elevation (DF or ~"f~b~): RKB 66 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 04-49 9. Permit number / approval number 196-171 10. APl number 50-029-22713-00 11. Field / Pool Prudhoe Bay Oil Pool Tagged Sand Back @ 9842' (03/18/2002) Effective depth: measured true vertical Casing Length Conductor 110' Surface 4036' Intermediate 10268' Slotted Liner 845' 9842 feet Junk (measured) 8712 feet Size Cemented Measured Depth True Vertical Depth 20" 260 sx AS 142' 142' 10-3/4" 3000 sx CS III, 390 sx 4068' 3820' Class 'G' 7-5/8" 850 sx Class 'G' 10300' 8852' 4-1/2" Uncemented 10293' - 11138' 8850' - 8844' Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Open Perfs 9698'-9758', 10065'-10120', 10145'-10165', 10224'-10280', 10390'-10421 ', Slotted Liner Interval 10456' - 11111 '. Slotted Liner Perf'd Intervals 10550'-10581 ', 10740'-10771 ', 10830'-10861' Open Perfs 8803'-8820', 8828'-8833', 8843'-8849', 8851'-8850' Slotted Liner Interval 8849'- 8846'. Slotted Liner Perf'd Intervals 8847'-8847', 8848'-8849', 8850'-8851'. 4-1/2", 12.6#, 13-CR, Tubing @ 9499'. 4-1/2", 12.6#, 13-CR, Tubing Tail @ 9544'. Packers & SSSV (type & measured depth) 7-5/8" x 4-1/2" TIW HBBP-T PKR @ 9499'. 7-5/8" x 4-1/2" TIW SSH LNR TOP PKR @ 10293'. 4-1/2" Camco SSSV Landing Nipple @ 494'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 02/01/2002 Subsequent to operation 03/20/2002 OiI-Bbl Shut-In Representative Daily Averaqe Production or Injection Data Gas-Mcr Water-Bbl 6499 Casing Pressure Tubing Pressure 1826 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __ Gas __ Suspended __ Service Water Injection 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. /~,~~ ~"'~,~~~.l~ Title: Techical Assistant DeWayne R Schnorr ORIGINAL Form 10-404 Rev 06/15/88 · Date April 02, 2002 Prepared by DeWa)/ne R. Schnorr 564-5174 SUBMIT IN DUPLICATE~' O3/07/2O02 03/10/20O2 03/12/2002 03/16/2002 03/16/2002 03/17/2O02 03/18/2002 03/19/2O02 O3/O7/O2 03/10/02 03/12/O2 03/16/O2 03/16/02 03/17/02 04-49 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ACID: IN]ECTIVI-FY TEST ACID: SAND PLUG ACID: DRIFT/TAG ACID: FILL CLEAN OUT; JEWELRY LOG--DEPTH CONTROL; PUMP BAIL FILL ACID: DRIFT/TAG ACID: FILL CLEAN OUT ACID: ACID TREATMENT ACID: ACID TREATMENT EVENT SUMMARY ARRIVE LOCATION. PJSM. MIRU. START PUMPING 60/40 METH @ 5.2 BPM @ 2600. SHUTDOWN. PUMPED MAX RATE 5 BPM . PRESSURE FELL TO 1900 # WHILE PUMPING. PRESSURE @ 1350 WHEN FINISHED. PLACED 25K# OF 20/40 SAND (3K# RIVER & 22K# CL) TO 10293'. PRESSURED TBG TO 2000 PSI WITH 8 BBLS ADDITIONAL CRUDE. ESTIMATED TOS IS @ 8880' MD. TBG FREEZE PROTECTED TO 5000' WITH CRUDE. WELL IS READY TO TAG ON 03-11-02 PM. DFF W/3.25" CENT SB AND SD @ 9532' SLM SB EMPTY RDMO (WELL SHUT IN) DRIFT TUBING INTO CASING TO ' SLM WITH A 2.3" SWAGE AND SAMPLE BAILER. S/D @ 9530' SLM. WELL LEFT SHUT IN. CTU #8, FCC, MEM-LOG. RIH W/2.25" REVERSING NOZZLE. CIRC OUT 5000' CRUDE TO TIGER TANK MAINTAINING 240 TO 350 PSI WELL HEAD PRESSURE. SHUT-IN CHOKE AND CONTINUE IN HOLE. PRESSURE STARTED CLIMBING IMMEDATILY TO 1550 PSI, GAS AT SURFACE. CONTINUE RIH TO TAG TD. TAGGED @ 9540' CTMD. PUH TO 9450' AND BEGIN CIRC OUT GAS. MONITOR WHP. TAKE SECOND GAS KICK. ATTEMPT TO INJECT, WELL IS LOCKED UP. BLEED WHP WHILE FP COIL. POOH TO INSTALL CHECK VALVES. CONTINUE FROM WSR 03/16/02... POOH. ADD CHECK VALVES TO BHA. SIWHP = 650 PSIG. RBIH. BEGIN CIRC @ 2200'. TOOK GAS KICK @ 5100'. CONTINUE RIH CIRC MAINTAINING 500 PSIG WHP. AT 9450' CTMD, INCREASED CIRC RAT TO 2.9 BPM. CIRCULATE BOTTOMS UP. SHUT-IN, CHECK FOR INJECTION CAPABILITY - TIGHT. BLEED WHP TO ZERO AND MONITOR - GOOD, NO GAS. CIRCULATE HOLDING 500 PSIG WHILE POOH. RIH W/REVERSE CIRC NOZZLE KEEPING 500 PSI ON WH. REVERSE SAND OUT TO 9725'. START TO LOSE CIRC. SWAP AND CLEAN OUT LONG WAY. CIRCULATE SAND TO 9900'. DRY TAG @ 9800'. PUMP ADDITIONAL BIO SWEEP AND CHASE TO SURFACE. RBIH TO 9880' CTMD. Page 1 04-49 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 03/17/O2 (continued) PUMP 30 BBL BIOZAN SWEEP OFF BOTTOM. POOH AT 80% WASHING MANDRELS. GOOD RETURNS. MU WEATHERFORD 2-3/8" MHA AND SWS GR/CCL. O3/18/O2 RIH WITH WEATHERFORD 2-3/8" MHA AND SWS GR/CCL. LOG DOWN FROM 9400' CTMD. TAGGED TD @ 9829' CTMD (9842' CORRECTED). PU AND RBIH AND CONFIRMED TAG. PUH LOG TO 9380'. RBIH. LOG UP AND FLAG PIPE AT 9680' CTMD. POOH W/MEMORY TOOLS. PUMPED INJECTION RATE @ 5 BPM 1400 PSI. APE DECIDED NOT TO PERF. CALL OUT ACID AND STAND BY. STARTED ACID @ CHANGE OUT. PUMPED TREATMENT AS PER ' PROGRAM: END OF NH4CL PREFLUSH; 1.8 BPM @ 700 PSIG WHP. END OF HCL; 1.8 BPM @ 450 PSIG WHP. END OF MUD ACID; 1.9 BPM @ 200 PSIG WHP. END OF NH4CL OVERFLUSH; 1.9 BPM @ 450 PSIG WHP. POST JOB INJECTIVITY; 1 BPM @ 360 PSI, 2 BPM @ 580 PSI, 3 BPM @ 1040 PSI, 5 BPM @ 1420 PSI. BEGIN RD DS CTU #8. 03/19/02 RD DS CTU #8. TURN WELL OVER TO PAD OPERATOR FOR INJECTION. <<<JOB COMPLETE>>> FLUIDS PUMPED BBLS 2 PRESSURE TEST LUBRICATOR TO 3000 PSI W/1 BBL OF DIESEL. 2 TESTS 145 60/40 METHANOL WATER 198 METHANOL WATER 250 SEAWATER 76 CRUDE 129 2% KCL WATER 1577 2% SLICK KCL WATER 15 BIOZAN 100 2# BIOZAN 176 3% NH4CL 100 7.5% HCL (TITRATION; HCL- 7.5%) 55 8/2% HCL-HF (TITRATIONS; HCL - 7.8%, HF- 1.8%), FE < 22 PPM 2823 TOTAL Page 2 . . MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Cammy 0 Taylor t6{ DATE: September 16, 2001 Chairman ~...... SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder 4.Q~~( BPX P.I. Supervisor¡.<tV -;¡:P \ DS 4 Oc....~ \ \ 4-20 & 4-49 FROM: Chuck Scheve PBU Petroleum Inspector Prudhoe Bay NON- CONFIDENTIAL Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval 1= Initial Test 4= Four Year Cycle v= Required by Variance W= Test during Workover 0= Other (describe in notes) Test's Details I traveled to BPXs Drill Site 4 and witnessed the 4 year MIT on well 4-20 and the initial MIT on converted weJI 4-49. The pretest tubing and casing pressures were observed and found to be stable. The casing was then pressured up and observed for 30 minutes with both wells demonstrating good mechanical integrity. M.I.T.'s performed: ~ Attachments: Number of Failures: º Total Time during tests: 2 hour cc: MIT report form 5/12/00 L.G. MIT PBU 4-20 & 4-499-16-01 CS.xls 10/1/01 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB rep.t) BP Exploration (Alaska), Inc. Development RKB 66 feet ,,.7= 3. Address Exploratory__ 7. Unit or Property name P. O. Box 196612 Stratigraphio__ SEP J- 0 Z001 Anchorage, AK 99519-6612 Service__X Prudhoe Bay Unit 4. Location of well at surface 8. Well number ,",,bska Oil & Gas Cor-~s. Comrnis 4969' FNL, 4896' FEL, Sec. 26, T11 N, R15E, UM (asp's 713202, 5952193) 04-49i Ancllr, r~,g~ At top of productive interval 9. Permit number / approval number 2800' FNL, 1343' FEL, SEC. 26, T11N, R15E, UM (asp's 716692, 5954463) 196-171/approval#301-O94signed7/20/2001 At effective depth 10. APl number 50-029-22713 At total depth 11. Field / Pool 3396' FNL, 567' FEL, Sec. 26, T11 N, R15E, UM (asp's 717484, 5953890) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 11138 feet Plugs (measured) Tagged PBTD @ 10089' on 9/03/2001. true vertical 8844 feet Effective depth: measured 10089 feet Junk (measured) true vertical 881 1 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 260 SxAS 1 1 0' 1 1 0' Surface 4002' 10-3/4" a000 Sx CS III & 390 Sx Class G 4068' 3820' Production 9431' 7-5/8" 85o sx C~ass G 10300' 8852' Slotted Liner 845' 4-1/2" Uncemented 1 1138' 8844' Perforation depth: measured 9698'-9758'; 10065'- 10120'; 10145'- 10165'; 10224'- 10280'; 10390'- 10421'; (Slotted Liner f/ 10456' - 11111'); (Slotted Liner perf'd f/10550' - 10581', 10740' - 10771', & 10830' - 10861'). true vertical 8631' - 8666'; 8803' - 8820'; 8828' - 8833'; 8843' - 8849'; 8851' - 8850'; (Slotted Liner f/8849' - 8846'); (Slotted Liner perf'd f/8847' - 8847', 8848' - 8849', & 8850' - 8851'). Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR Tbg @ 9544' MD. Packers & SSSV (type & measured depth) 7-5/8" X 4-1/2" TIW HBBP-T PACKER @ 9499' MD; 7-5/8" X 4-1/2" TIW SSH LINER TOP PACKER @ 10293' MD. 4-1/2" CAMCO BAL-O SSSV LANDING @ 494' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 13912 - 1257 Subsequent to operation 14748 1229 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations ._X Oil __ Gas __ Suspended __ Service Water Inj 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ Title: DS 4 Surveillance Engineer Date September 5, 2001 Dan Babcock Prepared by Paul Rauf 564-5799 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 04-49i DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS (POST CONVERSION) Date Event Summary 8/22/2001: 8/24/2001 - 8/25/2001: 9/01/2001 - 9/04/2001: RIH & tagged PBTD @ 10173' MD. RIH w/slickline & redummied GLV's. MITIA to 2050 psi - passed. MIRU ELU. PT'd equip to 3000 psi. RIH w/perforating guns & shot 60' of add perforations in multiple runs from: 9698' - 9758' MD (Zone 2C) Reference Log: BHCS 11/22/1996. Used 2-7/8" PJ carriers & all shots @ 6 SPF, 60° phasing, & random orientation. POOH w/ guns - ASF. Experienced problems with guns getting stuck. Pumped Schmoo-be-gone to free guns. Tagged PBTD @ 10089'. RD ELU. Placed well back on produced water injection service & obtained representative injection data. A IPROF is planned for this well in the near future. Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate_ (Prod-> Water Pull tubing _ Alter casing _ Repair well _ Other _X Inj Conversion) 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 4969' FNL, 4896' FEL, Sec. 26, T11 N, R15E, UM At top of productive interval 2800' FNL, 1343' FEL, SEC. 26, T11N, R15E, UM At effective depth At total depth 3396' FNL, 567' FEL, Sec. 26, T11 N, R15E, UM 5. Type of Well: Development __ Exploratow__ Stratigraphic__ Service__X (asp's 713202, 5952193) (asp's 716692, 5954463) (asp's 717484, 5953890) 6. Datum elevati°n (DF °r KB fc~)E C E ~ RKB 66 feet 7. Unit or Property name Prudhoe Bay Unit AUG ZOO/ 8. Well number Alaska 0il & Gas Cons. Comrnissi 04-49i Anchor2n~ 9. Permit number / approval number 196-171 / approval #301-094 signed 7/20/2001 10. APl number 50-029-22713 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11 138 feet Plugs (measured) 8844 feet Effective depth: measured 9928 feet Junk (measured) true vertical 8754 feet Tagged PBTD @ 9928' on 5/29/2001. Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 260 Sx AS 110' 110' Surface 4002' 10-3/4" 3000 Sx CS III & 390 Sx Class G 4068' 3820' Production 9431' 7-5/8" 850 Sx Class G 10300' 8852' Slotted Liner 845' 4-1/2" Uncemented 11 138' 8844' Perforation depth: measured 10065'- 10120'; 10145'- 10165'; 10224' - 10280'; 10390'- 10421'; Slotted Liner interval = 10456'- 11111 '; (slotted liner perf'd intervals = 10550' - 10581 ', 10740' - 10771 ', & 10830' - 10861 '). true vertical 8803' - 8820'; 8828' - 8833'; 8843' - 8849'; 8851' - 8850'; Slotted Liner interval = 8849' - 8846'; (slotted liner perf'd intervals = 8847' - 8847', 8848' - 8849', & 8850' - 8851 '). Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR Tbg @ 9544' MD. Packers & SSSV (type & measured depth) 7-5/8" X 4-1/2" TIW HBBP-T PACKER @ 9499' MD; 7-5/8" X 4-1/2" TIW SSH LINER TOP PACKER @ 10293' MD. 4-1/2" CAMCO BAL-O SSSV LANDING @ 494' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation OiI-Bbl 315 Representative Daily Averaqe Production or Iniection Data Gas-Mcf Water-Bbl 412 5640 17000 Casing Pressure Tubing Pressure - 244 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __ Gas __ Suspended _ Service __Water I nj__ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~¢~) ~ Title: DS 4 Surveillance Engineer Dan Babcock Date August 14, 2001 Prepared Paul Rauf 564-5799 Form 10-404 Rev 06/15/88 · ORIGINAL . SUBMIT IN DUPLICATE 04-49i DESCRIPTION OF WORK COMPLETED CONVERSION FROM PRODUCER TO WATER INJECTOR Date Event Summary 8/03/2000: 5/05/2001' 5/29/2001- 7/08/2001' 7/09/2001' 7/10/2001 - 7/19/2001: 8/06/2001: MITIA to 3000 psi - passed. RIH & drifted to 9928' (HAW). Ran CBT & logged cement quality f/PBTD @ 9928' - TT. Saw good cement. Performed last production well test. Well shut in for conversion. Performed drillsite facility modifications. This well was twinned with 04-11 i. Placed 04-49i on initial water injection (produced water service). Future wellwork includes adding 84' of perforations in Zone 3 (9672' - 9756' MD). Page I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _ Pedorate _ (Prod .> Water Inj Conversion) Other_X 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 4969' FNL, 4896' FEL, Sec. 26, T11 N, R15E, UM At top of productive interval 2800' FNL, 1343' FEL, SEC. 26, T11N, R15E, UM At effective depth At total depth 3396' FNL, 567' FEL, Sec. 26, T1 1N, R15E, UM 5. Type of Well: Development __X Exploratory __ Stratigraphic __ Service__ (asp's 713202, 5952193) (asp's 716692, 5954463) (asp's 717484, 5953890) 6. Datum elevation (DF or KB feet) RKB 66 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 04-49 9. Permit number / approval number 196-171 10. APl number 50-029-22713 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Size Conductor 110' 20" Surface 4002' 10-3/4" Production 9431' 7-5/8" Slotted Liner 845' 4-1/2" Perforation depth: Tubing (size, grade, and measured depth 11138 feet Plugs (measured) 8844 feet 10173 feet Junk (measured) 8835 feet Cemented 260 Sx AS 3000 Sx CS III & 390 Sx Class G Drifted to 10173' on 4/20/2000. Measured Depth True vertical Depth 110' 110' 4068' 3820' 850 sx c~ass G 10300' 8852' "~ 11138' 8844' Uncemented measured 10065'- 10120'; 10145'- 10165'; 10224'- 10280'; 10390'- 10421'; Slotted Liner interval = 10456'- 11111'; (slotted liner perf'd intervals = 10550' - 10581', 10740' - 10771', & 10830' - 10861'). true vertical 8803' - 8820'; 8828' - 8833'; 8843' - 8849'; 8851' - 8850'; Slotted Liner interval = 8849' - 8846'; (slotted liner perf'd intervals -- 8847' - 8847', 8848' - 8849', & 8850' - 8851'). 4-1/2", 12.6#, 13CR Tbg @ 9544' MD. Packers & SSSV (type & measured depth) 7-5/8" X 4-1/2" TIW HBBP-T PACKER @ 9499' MD; 7-5/8" X 4-1/2" TIW SSH LINER TOP PACKER @ 10293' MD. 4-1/2" CAMCO BAL-O SSSV LANDING @ 494' MD. 13. Attachments Description summary of proposal ~X Detailed operations program __ BOP sketch __ 15. Status of well classification as: 14. Estimated date for commencing operation May 15, 2001 16. If proposal was verbally approved Name of approver Date approved Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ Title: DS 11 Surveillance Engineer Dan Babcock FOR COMMISSION USE ONLY Questions? Call Dan Babcock @ 564-5735. Date /~ ~tO~ o~ Prepared by Paul Rauf 564-5799 Conditions of approval: Notify Commission so representative may witness Plug integrity__ ~. PTest__ Locatio, cleara, ce __ ~v~___.) ~ Mechanical Integrity Test~ Subsequent form required 10- . ' ' "' ~[~'~ Commissioner Approved by order of the Commission ._~ ........... ~_~_:. APR I i 2001 Form 10-403 Rev 06/15/88 · Approval no. Alaska 0il & Gas Cons. Commission Date bp BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 9, 2001 Tom Maunder Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Fax 276-7542 Dear Tom: Re: Sundry_ Notice for 04-49 Conversion from Producer to Water Injection Service Discussion Well DS 4-49 is currently a producer testing at 360 bopd, 94% WC and 6900 TGOR. The conversion of this well to water injection is part of a proposed MI expansion project for Drill Sites 4 and 11. As an injector, DS 4-49 will be eastern most of three guard wells which will act to contain MI and prevent its migration up into the gas cap. Reserve benefits will be realized from both waterflood and MI flood processes. Scope of Work In order to convert to water injection service, DS 4-49 will be twinned with existing injection well DS 4-11. Wellwork associated with this conversion will include dummying off the GLV's, circulating the backside with water and a diesel cap and running an MIT. Perforations in the lower Victor will be added and the well put on injection. Current perforations in the Lower Romeo will be left open in order to give additional waterflood support in the area. Diagnostic logs will be run as needed to verify injection conformance. If you have any questions concerning this Sundry Application, please don't hesitate to call me at 564-5735 or E-mail me at babcockdr@bp.com. Sincerely, Dan Babcock BPXA DS 11 Surveillance Engineer APR i 1 Alaska Oil & Gas Cons, Commission Anchorage 0 PERMIT DATA 96-171 RFT 96-171 MWD SRVY 96-171 EES SRVY 96-171 COMBO SSTVD 96-171 N/DEN 96-171 AIT 96-171 TRIPLE COMBO 96-171 BHP 96-171 DEN 96-171 BHC/SL 96-171 CN 96-171 7621 96-171 NGP-TVD 96-171 NGP-MD 96-171 7945 96-171 DGR/RES-MD 96-171 DGR/RES-TVD 10-407 DAILY WELL OPS AOGCC Individual Well Geological Materials Inventory T DATA PLUS ~/4617-6484 '~0-3942 ,~L/9000-10348 ~/9000-10348 ~L 9000-10348 9000-10348 9000-10348 / ~L 9000-10348 ~ 9000-10348 ~L~9000-10348 ~SCHLUM AIT/BHC ~L~830-8844 ~'4080-11138 ~SPERRY GR L 5990-7755 L 5187-6203 Are dry ditch samples required? yes ~'d received? Page: 1 Date: 11/25/98 RUN RECVD FINAL 12/06/96 02/12/97 02/12/97 FINAL 03/07/97 FINAL 03/07/97 FINAL 03/07/97 FINAL 03/07/97 FINAL 03/07/97 FINAL 03/07/97 FINAL 03/07/97 FINAL 03/07/97 1 03/07/97 FINAL 03/12/97 FINAL 03/12/97 3-8 04/09/97 FINAL 04/30/97 FINAL 04/30/97 ? yes ....... no Was the well cored? yes ~.~_~A~alysis & description received? ~:,. Are well tests required? ~ lyes Well is in compliance~L9a I 1 COMMENTS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 4969' FNL, 4896' FEL, Sec. 26, T11N, R15E, UM At top of productive interval 2479' FSL, 1343' FEL, Sec. 26, T11N, R15E, UM At effective depth At total depth 3396' FNL, 567' FEL, Sec. 26, T11N, R15E, UM 5. Type of Well: Development~X Exploratory__ Stratigraphic__ Service__ 6. Datum elevation (DF or KB feet) RKB 66 feet 7, Unit or Property name Prudhoe Bay Unit 8. Well number 04-49 9. Permit number / approval number 96-171 10. APl number 50-029-22713 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11138 feet 8844 feet Plugs (measured) Effective depth: measured 11025 feet Junk (measured) true vertical 8851 feet Casing Length Size Cemented Conductor 110' 20" 260 Sx AS Surface 4002' 10-3/4" 3000 sx cs iii & 390 sx Class G Production 9431' 7-5/8" 850 Sx C~ass G Slotted Liner 845' 4-1/2" Uncemented Tagged PBTD @ 11025',~ E~ lt1.¢1 ~.lf ~] ~_.b ,-,'~j~, -%¢ . Measured Depth Aiask~ Oii &CasCons, I r~'OV~l~ ??1~_' uep,rt 110' 110 4068' 3820' 10300' 8852' 11138' 8844' Perforation depth: measured 10065'- 10120'; 10145'- 10165'; 10224'- 10280'; 10390'- 10421'; Slotted Liner interval = 10456'- 11111'; (slotted liner perf'd intervals = 10550' - 10581', 10740' - 10771', & 10830' - 10861'). true vertical 8803' - 8820'; 8828' - 8833'; 8843' - 8849'; 8851' - 8850'; Slotted Liner interval = 8849' - 8846'; (slotted liner perf'd intervals = 8847' - 8847,, 8848' - 8849', & 8850' - 8851'). Tubing (size, grade, and measured depth) 4-1/2"12.6#, 13CR Tbg @ 9544' MD. Packers & SSSV (type & measured depth) 7-5/8" X 4-1/2" TIW SSH LINER TOP PACKER @10294' MD; 7-5/8"X4-1/2"TIWHBBP-TPACKER@9500'MD. 4-1/2" CAMCO BAL-O SSSV LANDING @ 495' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure ORIGihlAL 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mci Water-Bbl (shut in because it doesn't make enough fluid to keep well warm enough) 111 n/a 1082 Casing Pressure Tubing Pressure 228 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __X 16, Status of well classification as: Oil__X Gas__ Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Date Prepardd by Paul Rduf 263-49~ Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 04-49 DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 8/19/1999- 8/23/1999 - 8/24/1999: RIH & drifted w/dummy perf guns to 10162' MD. Did not tag PBTD due to deviation MIRU ELU & pressure tested equipment to 3000 psi. RIH w/perf guns & shot 75' of Add Perforations in the 7-5/8" production casing @: 10065'- 10120' MD (Zone lB) Reference Log: BHCS 11/22/1996. 10145'- 10165' MD (Zone 1 B) Used 3-3/8" carriers & all shots @ 4 SPF, random orientation, 60° phasing, & overbalanced press. Did not tag BTM. POOH w/guns. ASF. RD. Returned well to production & obtained a valid welltest. STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 96-171 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-66:12 ......... 50-029-22713 4. Location of well at surface i .... '"'~ ..... '"~ ~ 9. Unit or Lease Name 310' N SL, 4898' W EL, SEC. 26, T11N, R15E ;! ~~-/,,-,~i' ~ P rudhoe Bay Unit At top of productive interval ~ 10. Well Number 2479' NSL, 1343' WEL, SEC. 26, T11N, R15E ~ ~~_ ! I~! 04-49 At total depth ~- '- 11. Field and Pool 1884' NSL, 570' WEL, SEC. 26, T11 N, R15E Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Seri~iNo. Pool KBE - 66.10'I ADL 028324 12. Date Spudded11/05/96 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 16' N°' °f C°mpleti°nsl 1/30/96 12/03/96 N/A MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafrost 11138 8844 FT 11138 8844 FTI [] Yes [] No I (Nipple) 494' MD ! 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, Gyro, USIT, RFT, LWD (FL), ZDL, GR, CCL 23. CASING, LINER AND CEMENTING RECORD CASING SE'I-FING DEPTH HOLE SIZE WT. PER FT. GRADE TOP Bo'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# L-80 34' 4068' 13-1/2" 3000 sx CS III, 390 sx Class 'G' 7-5/8" 29.7# L-80 / 13Cr 33' 10340' 9-7/8" 850 sx Class 'G' 4-1/2" 12.6# L-80 10293' 11138' 6-3/4" Uncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 4-1/2", 12.6#, 13Cr 9544' 9499' MD TVD MD TVD 10456' - 11111' 8849' - 8846' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 100 Bbls of Diesel 27. PRODUCTION TEST ,, Date First Production IMethod of Operation (Flowing, gas lift, etc.) December 13, 1996 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure 0ALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. ~4-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED Form 10-407 Rev. 07-01-80 6~l~it~4D~Tate Alaska 0il & Gas Cons. Commission Anchorage Geologic Marke, 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Top of Sadlerochit 9671' 8614' Zone 2B 9758' 8666' Zone 2A 9942' 8759' Zone 1 /1 B 10049' 8798' Zone 1 A 10161' 8832' 3'1. List of Attachments Summary of Daily Drilling Reports, Surveys 32.1 hereby certify that t~)~~i~e and correct to the best of my knowledge PauIPrince Title Senior Drilling Engineer Date ~" % ~ c~ Prepared By Name/Number: Terrie Hubble, 564-4628 .... INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 RECEIVED ] 199'/ SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: 04-49 Rig Name: Doyon 14 AFE: 4J0338 Accept Date: 1 1/05/96 Spud Date: 1 1/05/96 Release Date: 1 2/03/96 Nov 5 1996 (1) Rig moved 95 %. Nov 6 1996 (2) Rig moved 98 %. Rig moved 100 %. Rig moved 100 %. Rigged up Divertor. Rigged up Kelly. Made up BHA no. 1 . Tested Divertor. Held safety meeting. Drilled to 215 ft. Made up BHA no. 1. Drilled to 242 ft. Nov 7 1996 (3) Serviced Shaker discharge line. Drilled to 302 ft. Serviced Mud shakers. Drilled to 332 ft. Took MWD survey at 332 ft. Drilled to 482 ft. Took MWD survey at 482 ft. Took Gyro survey at 482 ft. Took Gyro survey at 482 ft. Pulled out of hole to 200 ft. Made up BHA no. 2. R.I.H. to 393 ft. Reamed to 393 ft. R.I.H. to 482 ft. Took Gyro survey at 385 ft. Drilled to 497 ft. Took Gyro survey at 400 ft. Drilled to 513 ft. Took Gyro survey at 415 ft. Drilled to 528 ft. Reamed to 528 ft. Took Gyro survey at 430 ft. Drilled to 544 ft. Took Gyro survey at 447 ft. Drilled to 559 ft. Took Gyro survey at 462 ft. Drilled to 574 ft. Took Gyro survey at 477 ft. Nov 8 1996 (4) Took Gyro survey at 477 ft. Drilled to 588 ft. Took Gyro survey at 491 ft. Drilled to 602 ft. Took Gyro survey at 505 ft. Drilled to 617 ft. Took Gyro survey at 520 ft. Drilled to 662 ft. Took Gyro survey at 552 ft. Drilled to 692 ft. Took Gyro survey at 582 ft. Drilled to 722 ft. Took Gyro survey at 612 ft. Drilled to 752 ft. Took Gyro survey at 642 ft. Drilled to 782 ft. Took Gyro survey at 672 ft. Drilled to 812 ft. Took Gyro survey at 672 ft. Drilled to 842 ft. Took Gyro survey at 732 ft. Drilled to 902 ft. Took Gyro survey at 792 ft. Drilled to 991 ft. Took Gyro survey at 882 ft. Drilled to 1081 ft. Took Gyro survey at 972 ft. Drilled to 1172 ft. Took Gyro survey at 1062 ft. Drilled to 1575 ft. Nov 9 1996 (5) Drilled to 2011 ft. Circulated at 2011 ft. Flow check. Pulled out of hole to 200 ft. Drilled to 3040 ft. Operations Summary for: 0.. Nov 10 1996 (6) Drilled to 4079 ft. Circulated at 4079 ft. Flow check. Pulled out of hole to 1700 ft. R.I.H. to 4079 ft. Circulated at 4079 ft. Flow check. Took EMS survey at 4079 ft. Pulled out of hole to 3750 ft. Nov 11 1996 (7) Pulled out of hole to 200 ft. Pulled BHA. Held safety meeting. Ran Casing to 3034 ft (10.75 in OD). Circulated at 3034 ft. Ran Casing to 4069 ft (10.75 in OD). Circulated at 4069 ft. Rigged down Casing handling equipment. Ran Drillpipe in stands to 3980 ft. Circulated at 4069 ft. Held safety meeting. Pumped spacers - volume 70 bbl. Mixed and pumped slurry- 1029 bbl. Mixed and pumped slurry- 81 bbl. Displaced slurry- 64 bbl. Retrieved downhole equipment - Float collar. Circulated at 3980 ft. Pulled Drillpipe in stands to 400 ft. Nov 12 1996 (8) Pulled Drillpipe in stands to 0 ft. Rigged down Divertor. Installed Casing spool. Rigged up BOP stack. Tested BOP stack. Rigged down Annular preventor. Rigged up Annular preventor. Tested BOP stack. Removed BOP test plug assembly. Installed Bore protector. Held safety meeting. Ran electric logs. Nov 13 1996 (9) Ran electric logs. Made up BHA no. 3. R.I.H. to 1148 ft. Serviced Block line. R.I.H. to 3981 ft. Circulated at 3981 ft. Tested Casing. Held drill (Kick (well kill)). Drilled cement to 4067 ft. Drilled to 4104 ft. Circulated at 4104 ft. Performed formation integrity test. Drilled to 4564 ft. Nov 14 1996 (10) Drilled to 5440 ft. Circulated at 5440 ft. Flow check. Pulled out of hole to 4067 ft. R.I.H. to 5440 ft. Drilled to 5700 ft. Nov 15 1996 (11) Drilled to 6363 ft. Circulated at 6363 ft. Flow check. Pulled out of hole to 5665 ft. R.I.H. to 6363 ft. Drilled to 6769 ft. Nov 16 1996 (12) Drilled to 7019 ft. Circulated at 7019 ft. Flow check. Pulled out of hole to 235 ft. Pulled BHA. Rigged up Logging/braided cable equipment. Ran electric logs. Ran electric logs. Ran electric logs. Page 2 Operations Summary for: 0-. ~9 Nov 17 1996 (13) Ran electric logs. Rigged down Logging/braided cable equipment. Made up BHA no. 4 . R.I.H. to 6985 ft. Reamed to 7019 ft. Drilled to 7910 ft. Nov 18 1996 (14) Drilled to 8019 ft. Repaired Kelly/top drive hose. Flow check. Pulled out of hole to 300 ft. Pulled BHA. Made up BHA no. 5. R.I.H. to 4060 ft. Held safety meeting. Serviced Block line. Held safety meeting. Repaired Kelly/top drive hose. R.I.H. to 7966 ft. Washed to 8019 ft. Drilled to 8550 ft. Nov 19 1996 (15) Drilled to 9588 ft. Circulated at 9588 ft. Nov 20 1996 (16) Circulated at 9588 ft. Flow check. Pulled out of hole to 204 ft. Pulled BHA. Retrieved Bore protector. Installed BOP test plug assembly. Held safety meeting. Tested Well control. Retrieved BOP test plug assembly. Installed Bore protector. Made up BHA no. 6. R.I.H. to 1175 ft. R.I.H. to 7950 ft. Logged hole with LWD: Formation evaluation (FE) from 7996 ft to 8026 ft. R.I.H. to 9511 ft. Washed to 9588 ft. Drilled to 9600 ft. Circulated at 9600 ft. Drilled to 9662 ft. Nov 21 1996 (17) Drilled to 10117 ft. Pulled out of hole to 10004 ft. Tested MWD - Via string. Flow check. Pulled out of hole to 204 ft. Pulled BHA. Made up BHA no. 7. R.I.H. to 4060 ft. Serviced Block line. Nov 22 1996 (18) R.I.H. to 10040ft. Took MWD survey at 10040 ft. Washed to 10117 ft. Drilled to 10138 ft. Took MWD survey at 10138 ft. Drilled to 10348 ft. Circulated at 10348 ft. Pulled out of hole to 9188 ft. R.I.H. to 10348 ft. Circulated at 10348 ft. Flow check. Held safety meeting. Pulled out of hole to 204 ft. Held safety meeting. Pulled BHA. Serviced Drillfloor / Derrick. Rig waited: Service personnel. Rigged up sub-surface equipment - Formation logs. Nov 23 1996 (19) Rigged up sub-surface equipment - Formation logs. Held safety meeting. Ran Drillpipe in stands to 8736 ft. Rigged up sub- surface equipment - Other sub-surface equipment. Ran electric logs. Ran electric logs. Ran electric logs. Ran electric logs. Rigged down sub-surface equipment - Other sub-surface equipment. Pulled Drillpipe in stands to 93 ft. Rigged down sub-surface equipment- Formation logs. Made up BHA no. 8. R.I.H. to 9250 ft. Reamed to 9310 ft. R.I.H. to 9670 ft. Worked toolstring at 967O ft. Page Operations Summary for: 6 ,9 II Nov 24 1996 (20) Worked toolstring at 9670 ft. Reamed to 9842 ft. R.I.H. to 9872 ft. Jarred stuck pipe at 9872 ft. Laid down 455 ft of 5 in OD drill pipe. R.I.H. to 9674 ft. Reamed to 9874 ft. Jarred stuck pipe at 9874 ft. Circulated at 9874 ft. Jarred stuck pipe at 9874 ft. Nov 25 1996 (21) Jarred stuck pipe at 9874 ft. Held safety meeting. Rigged up Rigging equipment. Conduct braided cable operations - 5/16 size cable. Test Winch unit. Conduct braided cable operations - 5/16 size cable. Conduct braided cable operations - 5/16 size cable. Rigged up Stuffing box. Nov 26 1996 (22) Rigged up Stuffing box. Conduct braided cable operations - 5/16 size cable. Rigged down Stuffing box. Rigged up Drillstring handling equipment. Flow check. Pulled out of hole to 23 ft. Pulled BHA. Made up BHA no. 9. R.I.H. to 4069 ft. Serviced Block line. R.I.H. to 9836 ft. Fished at 9836 ft. Circulated at 9820 ft. Flow check. Pulled out of hole to 310 ft. Pulled BHA. Serviced Drillfloor / Derrick. Retrieved Bore protector. Installed BOP test plug assembly. Tested Well control. Nov 27 1996 (23) Tested Well control. Retrieved BOP test plug assembly. Installed Bore protector. Made up BHA no. 10. R.I.H. to 9020 ft. Reamed to 9120 ft. R.I.H. to 9763 ft. Reamed to 10348 ft. Circulated at 10348 ft. Pulled out of hole to 8827 ft. R.I.H. to 10348 ft. Circulated at 10348 ft. Flow check. Laid down 5000 ft of 5 in OD drill pipe. Nov 28 1996 (24) Laid down 5000 ft of 5 in OD drill pipe. Pulled BHA. Removed Bore protector. Worked on BOP - Top ram. Held safety meeting. Rigged up Casing handling equipment. Ran Casing to 10340 ft (7.625 in OD). Circulated at 10340 ft. Held safety meeting. Pumped spacers - volume 20 bbl. Pumped spacers - volume 50 bbl. Mixed and pumped slurry - 97 bbl. Displaced slurry - 465 bbl. Flow check. Circulated at 7511 ft. Nov 29 1996 (25) Circulated at 7511 ft. Pumped spacers- volume 50 bbl. Mixed and pumped slurry- 136 bbl. Mixed and pumped slurry- 30 bbl. Displaced slurry - 340 bbl. Rigged down Casing handling equipment. Installed Seal assembly. Worked on BOP - Top ram. Rigged down Kelly. Rigged up Kelly. Installed Bore protector. Made up BHA no. 11 . R.I.H. to 7435 ft. Serviced Block line. Drilled installed equipment - DV collar. Circulated at 7521 ft. R.I.H. to 10187 ft. Drilled cement to 10220 ft. Page 4 Operations Summary for: Nov 30 1996 (26) Drilled cement to 10303 ft. Circulated at 10303 ft. Tested Casing. Held drill (Kick (well kill)). Tested Casing. Drilled installed equipment - Float shoe. Drilled to 10358 ft. Circulated at 10358 ft. Drilled to 10946 ft. Dec I 1996 (27) Drilled to 11138 ft. Circulated at 11138 ft. Flow check. Pulled out of hole to 10340 ft. R.I.H. to 11138 ft. Circulated at 11138 ft. Flow check. Pulled out of hole to 1500 ft. Pulled BHA. Rigged up Casing handling equipment. Held safety meeting. Ran Casing to 800 ft (4.5 in OD). Ran Tubing to 800 ft (2.0625 in OD). Laid down 800 ft of Tubing. Laid down 60 ft of Casing. Dec 2 1996 (28) Ran Tubing to 830 ft (2.0625 in OD). Ran Drillpipe in stands to 10290 ft. Ran Drillpipe in stands to 11138 ft. Set Permanent packer at 10284 ft with 3000 psi. Tested Permanent packer - Via annulus. Circulated at 11110 ft. Flow check. Laid down 10284 ft of Drillpipe. Laid down 830 ft of Tubing. Rigged down Tubing handling equipment. Retrieved Bore protector. Rigged up Tubing handling equipment. Held safety meeting. Rigged up sub-surface equipment - Landing nipple assembly. Dec 3 1996 (29) Ran Tubing to 9000 ft (4.5 in OD). Rigged up sub-surface equipment - SCSSSV nipple assembly. Ran Tubing to 9543 ft (4.5 in OD). Installed Tubing hanger. Circulated at 9543 ft. Set Permanent packer at 9498 ft with 4000 psi. Set Permanent packer at 9498 ft with 4000 psi. Tested Tubing. Installed Hanger plug. Rigged down BOP stack. Installed Xmas tree. Dec 4 1996 (30) Tested All tree valves. Removed Hanger plug. Freeze protect well - 100 bbl of Diesel. Installed Hanger plug. Rigged down Rig services. Page SPt SHARED SERVICES DRILLING PBU / 4-49 5oo29 . .7 3oo NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN .00 .00 -66.10 0 33.80 33.80 -32.30 0 60.00 60.00 -6.10 0 110.00 109.99 43.89 0 228.00 227.96 161.86 1 Z-SUN DRILLING SERVICES ANCHORAGE ALASKA 0 0 54 54 36 259.00 258.95 192.85 1 30 291.00 290.94 224.84 1 12 324.00 323.94 257.84 0 54 350.00 349.93 283.83 0 48 370.00 369.93 303.83 0 42 385.00 384.93 318.83 400.00 399.93 333.83 416.00 415.93 349.83 431.00 430.93 364.83 447.00 446.93 380.83 462.00 461.93 395.83 0 477.15 477.08 410.98 0 492.00 491.93 425.83 0 505.00 504.93 438.83 0 520.90 520.83 454.73 1 552.03 551.95 485.85 582.17 582.07 515.97 612.00 611.86 545.76 642.89 642.71 576.61 672.03 671.80 605.70 DATE OF SURVEY: 113096 MWD SURVEY JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC 0 48 0 36 0 30 0 18 0 6 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6 0 12 24 6 N .00 E .00 .00N .00E N .00 E .00 .00N .00E N 5.70 W 3.44 .20N .02W N 8.40 W .09 .98N .12W N 11.60 W .60 3.51N .58W .00 .00 .05 .23 .65 N 13.80 W .37 4.33N .77W N 13.40 W .94 5.07N .94W N 15.90 W .92 5.65N 1.10W N 11.70 W .45 6.02N 1.19W N 7.00 W .59 6.28N 1.23W .76 .84 .90 .94 .99 1 42 2 17 3 5 3 17 3 0 N 28.00 W 1.93 6.47N 1.29W N 14.50 W 1.72 6.63N 1.36W N 7.80 E 1.46 6.78N 1.37W N 9.00 W 1.53 6.89N 1.37W N 26.00 W 1.29 6.94N 1.38W 1.00 .99 1.03 1.07 1.07 702.23 701.96 635.86 2 54 732.35 732.05 665.95 2 30 792.64 792.29 726.19 2 12 881.96 881.55 815.45 t 42 971.82 971.39 905.29 0 36 N 61.00 W .42 6.96N 1.40W N .00 E .67 6.97N 1.41W S 8.50 W 1.35 6.94N 1.42W S 2.00 E 1.59 6.87N 1.42W S 15.60 W 4.58 6.67N 1.46W 1.06 1.06 1.04 1.02 .91 1062.16 1061.72 995.62 1089.29 1088.84 1022.74 1194.31 1193.81 1127.71 1225.19 1224.67 1158.57 1287.68 1287.10 1221.00 S 11.90 W 1.95 5.93N 1.63W S 11.70 W 1.99 4.90N 1.85W S 6.60 W 2.80 3.51N 2.06W S 2.10 W 1.04 1.80N 2.19W S 8.20 E 2.19 .20N 2.11W .49 -.06 -.73 -1.44 -1.91 S 17.70 E 1.65 1.31S 1.77W S 22.80 E 1.55 2.64S 1.28W S 21.70 E .50 4.93S .34W S 25.40 E .58 7.72S .86E S 85.00 E 1.66 8.96S 1.90E -2.11 -2.10 -2.01 -1.83 -1.28 1 12 1 16 2 9 2 12 2 59 N 35.50 E 1.14 8.23S 2.92E N 25.10 E .88 7.73S 3.21E N 18.31 E .85 4.79S 4.33E N 19.39 E .21 3.68S 4.71E N 22.66 E 1.29 1.05S 5.74E -.07 .38 2.43 3.17 5.03 SPI Y-SUN DRILLING SERVICES ANCHOR3AGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 MWD SURVEY JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 1348.85 1348.14 1282.04 1442.70 1441.59 1375.49 1535.73 1534.05 1467.95 1629.65 1627.26 1561.16 1661.35 1658.68 1592.58 4 19 N 34.32 E 2.48 2.33N 7.65E 6 6 N 37.97 E 1.94 9.18N 12.72E 6 30 N 53.95 E 1.93 16.18N 20.02E 7 34 N 61.36 E 1.49 22.28N 29.75E 7 40 N 62.92 E .73 24.24N 33.46E 7.98 15.09 24.35 35.57 39.73 1692.93 1689.98 1623.88 1786.09 1782.25 1716.15 1848.74 1844.21 1778.11 1879.49 1874.56 1808.46 1971.06 1964.44 1898.34 7 35 N 60.97 E .86 26.21N 37.16E 8 16 N 60.00 E .74 32.55N 48.34E 8 47 N 55.80 E 1.29 37.49N 56.21E 9 32 N 55.52 E 2.44 40.26N 60.25E 12 29 N 54.43 E 3.23 50.31N 74.56E 43.88 56.56 65.64 70.38 87.27 2064.08 2055.09 1988.99 2156.39 2144.77 2078.67 2248.29 2233.72 2167.62 2342.37 2324.35 2258.25 2436.80 2414.39 2348.29 13 25 N 56.34 E 1.10 62.15N 91.73E 13 58 N 59.62 E 1.03 73.72N 110.26E 15 8 N 51.08 E 2.66 86.87N 129.16E 15 58 N 50.06 E .93 102.90N 148.65E 19 4 N 51.19 E 3.30 120.91N 170.63E 107.45 128.82 151.08 174.87 201.68 2532.15 2504.10 2438.00 2623.04 2588.47 2522.37 2716.85 2673.97 2607.86 2810.95 2758.13 2692.03 2906.64 2841.58 2775.48 20 29 N 52.38 E 1.55 140.86N 195.99E 23 9 N 51.50 E 2.96 161.70N 222.58E 25 24 N 52.52 E 2.44 185.43N 252.99E 27 40 N 52.50 E 2.40 211.02N 286.34E 30 54 N 54.86 E 3.59 238.70N 324.08E 232.33 264.45 301.14 341.23 386.16 2999.33 2920.99 2854.89 3090.03 2998.10 2932.00 3185.47 3078.31 3012.21 3278.10 3154.93 3088.83 3373.33 3232.83 3166.73 31 11 N 55.76 E .58 265.90N 363.39E 32 20 N 53.88 E 1.68 293.42N 402.41E 33 16 N 53.55 E .98 324.03N 444.09E 35 4 N 56.30 E 2.57 353.89N 486.67E 35 9 N 54.54 E 1.07 384.98N 531.77E 432.40 478.47 528.11 578.33 631.34 3468.37 3311.68 3245.58 3562.38 3391.02 3324.92 3657.16 3471.11 3405.01 3750.12 3550.11 3484.01 3847.72 3633.07 3566.97 32 43 N 50.90 E 3.34 417.07N 574.01E 32 8 N 50.22 E .73 449.09N 612.94E 32 31 N 49.19 E .71 481.87N 651.60E 31 4 N 50.70 E 1.77 513.40N 689.08E 32 29 N 52.73 E 1.81 545.23N 729.44E 682.00 729.54 777.07 823.07 871.88 3942.21 3712.89 3646.79 4007.17 3768.05 3701.95 4105.12 3851.96 3785.86 4198.71 3931.92 3865.82 4292.72 4011.64 3945.54 32 13 N 54.09 E .82 575.37N 770.03E 31 32 N 54.96 E 1.25 595.29N 797.97E 30 32 N 55.36 E 1.05 624.14N 839.43E 32 3 N 52.80 E 2.16 652.68N 878.78E 31 57 N 51.84 E .55 683.13N 918.21E 920.33 953.40 1002.22 1048.96 1096.42 Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 MWD SURVEY JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 4386.39 4091.25 4025.15 31 40 4480.59 4171.68 4105.58 31 2 4574.98 4252.68 4186.58 30 44 4667.99 4332.76 4266.66 30 23 4762.42 4414.44 4348.34 29 49 N 51.87 E .30 713.63N 957.04E N 51.86 E .66 743.90N 995.60E N 52.32 E .41 773.68N 1033.84E N 52.30 E .37 802.60N 1071.27E N 53.29 E .80 831.25N l109.00E 1143.34 1189.92 1236.04 1281.10 1326.36 4855.16 4494.99 4428.89 29 4950.15 4577.40 4511.30 30 5043.65 4658.19 4592.09 30 5136.42 4737.75 4671.65 31 5230.65 4817.93 4751.83 31 36 1 25 28 54 N 53.81 E .37 858.56N 1145.98E N 51.61 E 1.24 887.17N 1183.54E N 49.49 E 1.22 917.08N 1219.88E N 50.36 E 1.22 947.79N 1256.39E N 50.59 E .48 979.30N 1294.57E 1370.44 1415.52 1459.90 1504.71 1551.36 5325.05 4898.09 4831.99 31 50 5418.31 4977.38 4911.28 31 41 5511.54 5056.85 4990.75 31 21 5605.23 5136.82 5070.72 31 27 5695.68 5213.81 5147.71 31 51 N 51.06 E .27 1010.79N 1333.22E N 52.57 E .87 1041.14N 1371.80E N 52.36 E .37 1070.83N 1410.46E N 51.59 E .44 l100.91N 1448.92E N 52.41 E .65 1130.13N 1486.32E 1598.44 1645.07 1691.55 1737.97 1783.11 5788.17 5292.62 5226.52 31 16 5881.75 5372.92 5306.82 30 30 5974.25 5452.68 5386.58 30 21 6067.'76 5533.36 5467.26 30 22 6161.12 5614.18 5548.08 29 42 N 52.53 E .62 1159.62N 1524.71E N 51.20 E 1.11 1189.28N 1562.50E N 52.40 E .67 1218.25N 1599.32E N 50.37 E 1.10 1247.75N 1636.25E N 50.40 E .73 1277.55N 1672.25E 1829.27 1874.93 1919.43 1964.22 2008.24 6255.15 5696.02 5629.92 29 16 6344.54 5773.96 5707.86 29 22 6437.18 5854.69 5788.59 29 22 6530.83 5936.18 5870.08 29 41 6623.27 6016.71 5950.61 29 7 N 50.69 E .47 1306.97N 1707.99E N 51.76 E .60 1334.38N 1742.12E N 52.13 E .20 1362.39N 1777.90E N 51.34 E .54 1390.97N 1814.14E N 51.96 E .70 1419.14N 1849.73E 2051.88 2093.33 2136.52 2180.35 2223.43 6716.96 6098.58 6032.48 29 4 6811.92 6181.23 6115.13 29 53 6904.75 6261.64 6195.54 30 4 6998.50 6342.63 6276.53 30 24 7092.44 6423.63 6357.53 30 27 N 52.27 E .17 1447.11N 1885.68E N 53.88 E 1.21 1475.18N 1923.05E N 56.51 E 1.43 1501.65N 1961.13E N 54.86 E .96 1528.27N 2000.13E N 55.18 E .18 1555.55N 2039.12E 2266.78 2311.49 2356.33 2402.07 2448.04 7184.80 6503.16 6437.06 30 38 7279.42 6584.53 6518.43 30 44 7373.51 6665.41 6599.31 30 42 7465.96 6744.81 6678.71 30 53 7560.13 6825.72 6759.62 30 38 N 54.53 E .41 1582.58N 2077.51E N 54.35 E .14 1610.67N 2116.80E N 54.19 E .09 1638.74N 2155.82E N 54.08 E .21 1666.48N 2194.19E N 53.20 E .55 1695.04N 2232.99E 2493.36 2539.88 2586.15 2631.69 2677.92 SP5 f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 MWD SURVEY JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 7654.61 6906.97 6840.87 7748.31 6987.48 6921.38 7840.82 7067.03 7000.93 7922.78 7137.58 7071.48 7951.87 7162.59 7096.49 30 43 30 48 30 35 30 36 30 47 N 53.14 E .09 1723.95N 2271.59E N 53.37 E .15 1752.63N 2310.00E N 53.90 E .38 1780.63N 2348.04E N 54.41 E .32 1805.06N 2381.85E N 54.63 E .76 1813.68N 2393.94E 2724.08 2769.98 2815.29 2855.42 2869.73 7997.55 7201.88 7135.78 8091.39 7282.02 7215.92 8185.55 7361.19 7295.09 8279.49 7439.48 7373.38 8373.79 7517.93 7451.83 30 32 32 7 33 24 33 42 33 41 N 55.75 E 1.36 1826.98N 2413.07E N 54.44 E 1.83 1854.91N 2453.08E N 52.94 E 1.60 1885.09N 2494.14E N 52.01 E .64 1916.72N 2535.31E N 51.74 E .16 1949.02N 2576.47E 2892.25 2939.41 2988.30 3037.81 3087.53 8468.64 7596.88 7530.78 8560.54 7673.84 7607.74 8655.92 7754.24 7688.14 8751.07 7835.11 7769.01 8782.95 7862.55 7796.45 33 38 32 35 32 30 31 2 30 10 N 50.49 E .73 1982.03N 2617.40E N 52.19 E 1.52 2013.40N 2656.60E N 53.34 E .66 2044.46N 2697.46E N 53.73 E 1.55 2074.24N 2737.75E N 55.04 E 3.46 2083.69N 2750.95E 3137.28 3184.84 3233.85 3281.90 3297.53 8877.37 7945.09 7878.99 8971.50 8028.51 7962.41 9066.74 8113.81 8047.71 9161.75 8198.36 8132.26 9255.87 8280.53 8214.43 27 53 27 17 25 29 28 46 29 35 N 55.86 E 2.45 2109.68N 2788.67E N 52.77 E 1.64 2135.10N 2824.08E N 49.92 E 2.32 2161.51N 2857.15E N 51.34 E 3.52 2188.96N 2890.65E N 56.05 E 2.59 2216.09N 2927.62E 3341.87 3383.83 3423.94 3464.81 3508.82 9287.71 8308.34 8242.24 9319.60 8336.24 8270.14 9350.87 8363.35 8297.25 9382.70 8390.53 8324.43 9410.82 8414.18 8348.08 28 44 N 60.10 E 6.75 2224.29N 2940.77E 29 11 N 60.58 E 1.59 2231.94N 2954.19E 30 32 N 61.86 E 4.80 2239.43N 2967.84E 32 10 N 64.62 E 6.80 2246.88N 2982.63E 33 22 N 69.30 E 9.97 2252.82N 2996.63E 3523.99 3539.21 3554.60 3571.05 3586.23 9441.54 8439.60 8373.50 9473.00 8465.35 8399.25 9504.88 8491.15 8425.05 9533.98 8514.30 8448.20 9565.25 8538.67 8472.58 34 54 N 66.00 E 7.82 2259.38N 3012.57E 35 16 N 71.20 E 9.58 2265.97N 3029.39E 36 40 N 69.24 E 5.66 2272.31N 3047.01E 37 55 N 70.16 E 4.70 2278.43N 3063.55E 39 36 N 71.94 E 6.47 2284.78N 3082.06E 3603.45 3621.51 3640.24 3657.87 3677.44 9596.99 8562.70 8496.60 9628.96 8585.83 8519.73 9659.82 8606.83 8540.73 9690.58 8626.46 8560.37 9720.60 8644.47 8578.37 41 58 45 22 48 50 51 50 54 27 N 74.46 E 9.09 2290.76N 3101.91E N 77.38 E 12.34 2296.11N 3123.32E N 80.62 E 13.62 2300.41N 3145.51E N 84.20 E 13.24 2303.52N 3168.97E N 87.36 E 12.13 2305.27N 3192.92E 3698.14 3720.09 3742.41 3765.52 3788.63 Y-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 MWD SURVEY JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 FT. OPER. ATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9752.40 8662.73 8596.63 9782.40 8679.55 8613.46 9814.58 8697.17 8631.07 9847.45 8714.61 8648.51 9878.89 8730.66 8664.56 55 28 56 17 57 20 58 34 6O 3 S 88.31 E 11.60 2305.48N 3218.95E S 85.76 E 7.54 2304.20N 3243.75E S 82.72 E 8.55 2301.49N 3270.54E S 79.22 E 9.78 2297.11N 3298.05E S 75.54 E 11.11 2291.20N 3324.43E 3813.16 3836.03 3860.28 3884.63 3907.40 9910.78 8745.94 8679.84 9942.28 8759.73 8693.63 9980.97 8774.76 8708.66 10004.59 8782.94 8716.84 10036.51 8793.54 8727.44 62 65 68 70 7O 41 22 54 34 37 S 71.80 E 13.19 2283.32N 3351.28E S 68.27 E 13.21 2273.64N 3377.88E S 64.32 E 13.10 2259.30N 3410.51E S 61.85 E 12.09 2249.27N 3430.26E S 58.99 E 8.45 2234.41N 3456.44E 3929.94 3951.63 3977.39 3992.52 4012.05 10068.44 8803.86 8737.76 10099.38 8813.69 8747.59 10129.75 8823.11 8757.01 10160.65 8831.51 8765.41 10191.68 8838.12 8772.02 71 40 71 16 72 33 75 55 79 28 S 56.96 E 6.87 2218.39N 3482.06E S 57.13 E 1.39 2202.43N 3506.67E S 55.68 E 6.17 2186.46N 3530.72E S 54.86 E 11.23 2169.51N 3555.15E S 53.44 E 12.25 2151.76N 3579.72E 4030.64 4048.32 4065.45 4082.62 4099.64 10222.21 8842.83 8776.73 10252.89 8846.27 8780.17 10278.43 8848.64 8782.54 10322.41 8851.27 8785.17 10354.41 8851.69 8785.59 82 45 84 20 85 1 88 5 90 24 S 53.12 E 10.83 2133.73N 3603.89E S 52.72 E 5.34 2115.35N 3628.21E S 51.89 E 4.19 2099.80N 3648.33E S 51.90 E 6.98 2072.71N 3682.88E S 52.00 E 7.19 2052.99N 3708.07E 4116.20 4132.77 4146.36 4169.56 4186.49 10385.64 8851.05 8784.95 10417.33 8849.90 8783.80 10449.41 8848.95 8782.85 10481.46 8848.38 8782.28 10512.66 8847.75 8781.65 91 56 92 13 91 10 90 51 91 26 S 52.00 E 4.93 2033.77N 3732.67E S 51.99 E .92 2014.27N 3757.62E S 52.18 E 3.36 1994.57N 3782.92E S 51.92 E 1.26 1974.86N 3808.19E S 52.62 E 2.93 1955.77N 3832.86E 4203.04 4219.83 4236.86 4253.87 4270.53 10544.63 8846.93 8780.83 10575.21 8846.47 8780.37 10607.16 8846.65 8780.55 10639.55 8847.15 8781.05 10671.15 8847.45 8781.35 91 28 90 15 89 7 89 5 89 46 S 52.94 E 1.01 1936.44N 3858.31E S 53.31 E 4.20 1918.09N 3882.77E S 53.08 E 3.58 1898.96N 3908.35E S 52.74 E 1.05 1879.42N 3934.18E S 52.89 E 2.20 1860.33N 3959.36E 4287.84 4304.55 4322.05 4339.65 4356.78 10703.30 8847.61 8781.51 10733.87 8848.05 8781.95 10766.18 8848.76 8782.66 10797.93 8849.16 8783.06 10830.03 8849.44 8783.34 89 39 88 41 88 46 89 46 89 13 S 52.89 E .37 1840.93N 3984.99E S 52.56 E 3.32 1822.42N 4009.32E S 52.76 E .65 1802.83N 4035.00E S 52.93 E 3.23 1783.65N 4060.30E S 53.23 E 1.95 1764.37N 4085.96E 4374.24 4390.77 4408.20 4425.43 4442.95 SPt Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 MWD SURVEY JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 10862.03 8850.36 8784.2 10894.01 8851.74 8785.6 10925.95 8852.92 8786.8 10958.17 8853.23 8787.1 10989.95 8852.48 8786.3 6 87 29 S 52.94 E 5.51 1745.16N 4111.53E 4 87 32 S 52.84 E .34 1725.88N 4137.01E 2 88 14 S 52.51 E 2.42 1706.53N 4162.39E 3 90 38 S 51.75 E 7.81 1686.76N 4187.82E 8 92 5 S 51.14 E 4.95 1666.96N 4212.66E 4460.42 4477.77 4495.01 4512.14 4528.72 11022.12 8851.01 8784.9 11052.18 8849.20 8783.1 11083.73 8847.18 8781.0 11138.00 8843.99 8777.8 1 93 7 S 51.17 E 3.23 1646.80N 4237.69E 0 93 46 S 51.30 E 2.20 1628.01N 4261.09E 8 93 33 S 51.26 E .71 1608.32N 4285.65E 9 93 10 S 51.30 E .70 1574.43N 4327.92E 4545.35 4560.91 4577.27 4605.40 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4605.40 FEET AT NORTH 70 DEG. 0 MIN. EAST AT MD = 11138 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 70.01 DEG. TIE-IN SURVEY AT SURFACE 0.00' MD PROJECTED SURVEY AT 11,138.00' MD SP5 f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORT}{ SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION .00 .00 -66.10 .00 N .00 E .00 1000.00 999.57 933.47 8.99 S 2.19 E .43 2000.00 1992.69 1926.59 53.95 N 79.65 E 7.31 3000.00 2921.56 2855.46 266.10 N 363.68 E 78.44 4000.00 3761.94 3695.83 593.13 N 794.90 E 238.06 .43 6.88 71.13 159.63 5000.00 4620.55 4554.45 902.72 N 1203.07 E 379.45 6000.00 5474.90 5408.80 1226.19 N 1609.63 E 525.10 7000.00 6343.93 6277.83 1528.71 N 2000.75 E 656.07 8000.00 7203.99 7137.89 1827.68 N 2414.10 E 796.01 9000.00 8053.84 7987.74 2143.01 N 2834.49 E 946.16 141.38 145.65 130.97 139.94 150.15 10000.00 8781.40 8715.30 2251.29 N 3426.44 E 1218.60 11000.00 8852.11 8786.01 1660.66 N 4220.48 E 2147.89 11138.00 8843.99 8777.89 1574.43 N 4327.92 E 2294.01 272.44 929.29 146.12 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPE :-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TV"D VERTICAL DIFFERENCE CORRECTION .00 .00 -66.10 66.10 66.10 .00 166.12 166.10 100.00 266.15 266.10 200.00 366.17 366.10 300.00 .00 N .30 N 1.90 N 4.51 N 6.24 N 00 .03 26 .81 1 23 E .00 W .00 .00 W . 02 .01 W .05 .04 W .07 .02 466.17 466.10 400.00 566.19 566.10 500.00 666.32 666.10 600.00 766.43 766.10 700.00 866.50 866.10 800.00 6.96 N 5.48 N .50 N 3.98 S 7.30 S 1 40 1.73 2 15 .72 66 W .07 .00 W .09 .02 W .22 .13 W .33 .11 E .40 .07 966.53 966.10 900.00 1066.54 1066.10 1000.00 1166.58 1166.10 1100.00 1266.66 1266.10 1200.00 1366.86 1366.10 1300.00 8.96 S 8.15 S 5.78 S 2.06 S 3.45 N 1 85 2.97 4.00 5.31 8.41 E .43 .03 E .44 .01 E .48 .04 E ~56 .08 E .76 .21 1467.35 -1466.10 1400.00 1567.98 1566.10 1500.00 1668.83 1666.10 1600.00 1769.77 1766.10 1700.00 1870.91 1866.10 1800.00 11.25 N 14.33 E 1.25 .49 18.33 N 22.97 E 1.88 .63 24.70 N 34.35 E 2.73 .85 31.38 N 46.31 E 3.67 .94 39.47 N 59.10 E 4.81 1.14 1972.77 1966.10 1900.00 2075.40 2066.10 2000.00 2178.37 2166.10 2100.00 2281.84 2266.10 2200.00 2385.97 2366.10 2300.00 50.54 N 63.60 N 76.40 N 92.38 N 110.89 N 74 93 114 135 158 .87 .92 .83 .98 .30 6.67 1.86 9.30 2.64 12.27 2.97 15.74 3.47 19.87 4.13 2491.60 2466.10 2400.00 2598.77 2566.10 2500.00 2708.14 2666.10 2600.00 2819.96 2766.10 2700.00 2935.22 2866.10 2800.00 132.21 N 155.86 N 183.16 N 213.57 N 247.15 N 184 215 250 289 336 .79 .21 .02 .69 .09 25 32 42 53 69 .50 5.63 .67 7.18 .04 9.37 .86 11.82 .12 15.26 3052.18 2966.10 2900.00 3170.87 3066.10 3000.00 3291.74 3166.10 3100.00 3413.76 3266.10 3200.00 3532.94 3366.10 3300.00 281.53 N 319.27 N 358.24 N 398.55 N 439.07 N 386.05 437.65 493.20 550.29 600.91 86.08 104.77 125.64 147.66 166.84 16.96 18.69 20.88 22.01 19.19 SP5 f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 OPERATOR: ARCO ALASKA INC FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3651.22 3466.10 3400.00 3768.79 3566.10 3500.00 3886.88 3666.10 3600.00 4004.89 3766.10 3700.00 4121.54 3866.10 3800.00 479.78 N 649.18 519.50 N 696.54 557.94 N 746.18 594.60 N 797.00 628.89 N 846.29 E 185.12 18.27 E 202.69 17.57 E 220.78 18.09 E 238.79 18.01 E 255.44 16.65 4239.04 3966.10 3900.00 4356.85 4066.10 4000.00 4474.07 4166.10 4100.00 4590.59 4266.10 4200.00 4706.63 4366.10 4300.00 665.62 N 895.83 704.05 N 944.84 741.82 N 992.96 778.56 N 1040.15 814.54 N 1086.74 E 272.94 17.50 E 290.75 17.81 E 307.97 17.23 E 324.49 16.52 E 340.53 16.04 4821.94 4466.10 4400.00 4937.09 4566.10 4500.00 5052.82 4666.10 4600.00 5169.66 4766.10 4700.00 5287.39 4866.10 4800.00 848.87 N 1132.73 883.12 N 1178.42 920.10 N 1223.42 958.87 N 1269.76 998.30 N 1317.77 E 355.84 15.30 E 370.99 15.16 E 386.72 15.73 E 403.56 16.84 E 421.29 17.73 5405.05 4966.10 4900.00 5522.37 5066.10 5000.00 5639.55 5166.10 5100.00 5757.14 5266.10 5200.00 5873.83 5366.10 5300.00 1036.90 N 1366.27 1074.28 N 1414.92 1112.03 N 1462.95 1149.82 N 1511.92 1186.76 N 1559.37 E 438.95 17.66 E 456.27 17.32 E 473.45 17.19 E 491.04 17.58 E 507.73 16.69 5989.80 5466.10 5400.00 6105.70 5566.10 5500.00 6220.84 5666.10 5600.00 6335.52 5766.10 5700.00 6450.27 5866.10 5800.00 1223.05 N 1605.54 1259.98 N 1651.02 1296.34 N 1695.01 1331.64 N 1738.65 1366.33 N 1782.97 E 523.70 15.97 E 539.60 15.90 E 554.74 15.14 E 569.42 14.68 E 584.17 14.75 6565.27 5966.10 5900.00 6679.80 6066.10 6000.00 6794.46 6166.10 6100.00 6909.90 6266.10 6200.00 7025.71 6366.10 6300.00 1401.62 N 1827.45 1436.06 N 1871.41 1470.05 N 1916.02 1503.08 N 1963.29 1536.20 N 2011.39 E 599.17 15.00 E 613.70 14.53 E 628.36 14.66 E 643.80 15.44 E 659.61 15.81 7141.72 6466.10 6400.00 7257.98 6366.10 6500.00 7374.31 6666.10 6600.00 7490.77 6766.10 6700.00 7607.07 6866.10 6800.00 1569.83 N 2059.62 1604.28 N 2107.90 1638.98 N 2156.16 1673.95 N 2204.51 1709.38 N 2252.16 E 675.62 16.01 E 691.88 16.26 E 708.21 16.33 E 724.67 16.45 E 740.97 16.30 Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 10 SH3kRED SERVICES DRILLING PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 113096 JOB NUMBER: AK-MW-60166 KELLY BUSHING ELEV. = 66.10 OPERATOR: ARCO ALASKA INC FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD DIFFERENCE VERTICAL CORRECTION 7723.42 6966.10 6900.00 1745.02 N 2299.77 E 757.31 7839.74 7066.10 7000.00 1780.31 N 2347.59 E 773.64 7955.96 7166.10 7100.00 1814.89 N 2395.65 E 789.86 8072.59 7266.10 7200.00 1849.10 N 2444.95 E 806.49 8191.42 7366.10 7300.00 1887.04 N 2496.72 E 825.33 16.35 16.33 16.21 16.63 18.84 8311.49 7466.10 7400.00 1927.65 N 2549.31 E 845.39 8431.67 7566.10 7500.00 1969.00 N 2601.59 E 865.57 8551.35 7666.10 7600.00 2010.37 N 2652.68 E 885.25 8669.99 7766.10 7700.00 2048.97 N 2703.52 E 903.89 8787.06 7866.10 7800.00 2084.88 N 2752.64 E 920.96 20.06 20.18 19.68 18.64 17.07 8901.14 7966.10 7900.00 2115.92 N 2797.87 E 935.04 9013.79 8066.10 8000.00 2146.83 N 2839.50 E 947.69 9125.18 8166.10 8100.00 2178.14 N 2877.25 E 959.08 9239.27 8266.10 8200.00 2211.51 N 2920.82 E 973.17 9354.06 8366.10 8300.00 2240.19 N 2969.28 E 987.96 14.08 12.65 11.39 14.09 14.79 9473.92 8466.10 8400.00 2266.10 N 3029.92 E 1007.82 9601.60 8566.10 8500.00 2291.57 N 3104.92 E 1035.50 9758.35 8666.10 8600.00 2305.33 N 3223.86 E 1092.25 9958.06 8766.10 8700.00 2268.08 N 3391.20 E 1191.96 11138.00 8843.99 8777.89 1574.43 N 4327.92 E 2294.01 19.86 27.68 56.75 99.70 1102.05 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPE /-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLNG PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 111096 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60160 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. .00 .00 -66.10 0 0 N .00 E .00 3750.12 3559.97 3493.87 31 50 N 25.42 E .85 3847.72 3642.93 3576.83 31 43 N 25.94 E .31 3942.00 3723.20 3657.10 31 33 N 25.58 E .26 .00N .00E .00 917.32N 436.07E 723.39 963.65N 458.35E 760.16 1008.20N 479.84E 795.59 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 1116.56 FEET AT NORTH 25 DEG. 27 MIN. EAST AT MD = 3942 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 70.01 DEG. TIE-IN SURVEY AT SURFACE 0.00' MD PROJECTED SURVEY AT 3,942.00' MD SPE f-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE SHARED SERVICES DRILLNG PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 111096 JOB NUMBER: AK-EI-60160 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -66.10 .00 N .00 E .00 1000.00 996.34 930.24 66.81 N 31.76 E 3.66 3.66 2000.00 1970.84 1904.74 265.78 N 126.34 E 29.16 25.51 3000.00 2902.11 2836.01 592.54 N 281.68 E 97.89 68.73 3942.00 3723.20 3657.10 1008.20 N 479.84 E 218.80 120.91 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP5 f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLNG PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 111096 JOB NIJMBER: AK-EI-60160 KELLY BUSHING ELEV. = 66.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -66.10 66.10 66.10 .00 166.12 166.10 100.00 266.17 266.10 200.00 366.28 366.10 300.00 .00 N .00 E .30 N .14 E .85 N .88 E .75 N 2.26 E .98 N 4.27 E .00 .00 .00 .02 .02 .07 .05 .18 .11 466.47 466.10 400.00 566.77 566.10 500.00 667.19 666.10 600.00 767.76 766.10 700.00 868.50 866.10 800.00 14.56 N 6.92 E 21.49 N 10.22 E 29.78 N 14.15 E 39.42 N 18.74 E 50.42 N 23.97 E .37 .19 .67 .30 .09 .42 .66 .57 .40 .74 969.43 966.10 900.00 1070.59 1066.10 1000.00 1171.99 1166.10 1100.00 1273.65 1266.10 1200.00 1375.61 1366.10 1300.00 62.80 N 29.85 E 76.56 N 36.39 E 91.71 N 43.60 E 108.26 N 51.47 E 126.22 N 60.00 E 3.33 .94 4.49 1.16 5.89 1.40 7.55 1.67 9.51 1.96 1477.89 1466.10 1400.00 1580.52 1566.10 1500.00 1683.52 1666.10 1600.00 1786.92 1766.10 1700.00 1890.76 1866.10 1800.00 145.61 N 69.22 E 166.44 N 79.12 E 188.73 N 89.71 E 212.48 N 101.01 E 237.73 N 113.01 E 11.79 2.28 14.42 2.63 17.42 3.00 20.82 3.40 24.66 3.83 1995.05 1966.10 1900.00 2099.84 2066.10 2000.00 2205.16 2166.10 2100.00 2311.03 2266.10 2200.00 2417.50 2366.10 2300.00 264.48 N 125.73 E 292.76 N 139.17 E 322.60 N 153.35 E 354.01 N 168.28 E 387.02 N 183.98 E 28.95 4.30 33.74 4.79 39.06 5.32 44.93 5.88 51.40 6.47 2524.61 2466.10 2400.00 2632.39 2566.10 2500.00 2740.88 2666.10 2600.00 2850.13 2766.10 2700.00 2960.17 2866.10 2800.00 421.66 N 200.44 E 457.96 N 217.70 E 495.95 N 235.76 E 535.68 N 254.65 E 577.16 N 274.37 E 58 66 74 84 94 .51 7.11 .29 7.78 .78 8.49 .03 9.25 .07 10.04 3071.07 2966.10 2900.00 3182.86 3066.10 3000.00 3295.61 3166.10 3100.00 3409.37 3266.10 3200.00 3524.20 3366.10 3300.00 620.46 N 294.95 E 665.60 N 316.40 E 712.63 N 338.76 E 761.61 N 362.05 E 812.59 N 386.28 E 104.97 116.76 129.51 143.27 158.10 10.90 11.79 12.75 13 .76 14.83 SP5 f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLNG PBU / 4-49 500292271300 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/10/97 DATE OF SURVEY: 111096 JOB NUMBER: AK-EI-60160 KELLY BUSHING ELEV. = 66.10 OPERATOR: ARCO ALASKA INC FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3640.17 3466.10 3400.00 865.62 N 411.49 E 174.07 15.96 3757.34 3566.10 3500.00 920.77 N 437.70 E 191.24 17.17 3874.96 3666.10 3600.00 976.53 N 464.61 E 208.86 17.62 3942.00 3723.20 3657.10 1008.20 N 479.84 E 218.80 9.94 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS r-.. STATE OF ALASKA _ASKA OIL AND GAS CONSERVATION COMMIS ,~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown _ Stimulate__ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair we[i_ Other _ 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development_X 66' RKB 3. Address: Exploratory_ 7. Unit or Property: P.O. Box 100360 Stratagrapic _ Anchorage, AK 99510-0360 service_ Prudhoe Bay Unit 4. Location of well at surface: 8. Well number: 310' NSL, 4898' WEL, Sec 26, T11N, R15E, UM. 4-49 At top of productive interval: 9. Permit number/approval number: 2479' NSL, 1343' WEL, Sec 26, T11N, R15E, UM. 96-171 At effective depth: 10. APl number: 50-029-22713 At total depth: 11. Field/Pool: 1.8.,84' NSL, 570' WEL, Sec 26, T11N, R15E, UM. Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 11138 feet Plugs (measured) FCO to 11025' MD (1/13/98). true vertical 8844 feet Effective Depth: measured 11025 feet Junk (measured) true vertical 8851 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 110' 20" 260 Sx AS 110' 110' Surface 4034' 10-3/4" 3000 Sx CS III & 4068' 3820' 390 Sx Class G Production 10307' 7-5/8" 850 Sx Class G 10340' 8852' Liner 845' 4-1/2" Uncemented 11138' 8844' Perforation Depth measured 10224 - 10280; 10390 - 10421'; & Slotled Liner at 10456 - 11111' w/perfed intervals at: true vertical 8843- 8849'; 8851 - 8850'; & Slotted Liner at 8849- 8846' w/perfed intervals at: '~" ~'~j ~ ~~' ~7 ,it"~ i..~? 8847- 8847'; 8848- 8849'; 8850- 8851' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13 CR, Tbg @ 9544' MD. ~';~" ;~''~ (;' ~' (~ii ],~,r.-)~-i Packers and SSSV (type and measured depth) TIW HBBP-T Packer @ 9499' MD; Camco BaI-O SSSV @ 494' MD. /'~'~'~ho~'~ge 13. Stimulation or cement squeeze summary "' 'i :' ~ ~ '"'- :'~ ! ': :~ Intervals treated (measured) see attached i ,:i -i ~ i i /Jr L Intervals treated (measured) 14. Representitive Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 178 1630 721 266 Subsequent to operation 189 1131 1111 245 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _X Oil _X Gas _ Suspended _ Service _ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~~ '~ . ~ Title: Engineering Supervisor Date ~>_ z.~'_?4~' Form 10-404 Rev 06/15/88 SUBMIT iN DUPLICATE 4-49 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 1/13/98: RIH w/milling BHA & milled out No-Go Nipple in the 4-1/2" tubing at 10451' MD to 3.65" ID, then RIH & jetted a fill cleanout to 11025' MD. POOH w/milling BHA. RD. 4/28/98 - 4/29/98: MIRU CTU & PT equipment. Added Perforation interval in Blank Liner at: 10390 - 10421' MD (Z1) Added Perforation intervals in Slotted Liner at: 10550- 10581' MD (Z1) 10740- 10771' MD (Z1) 10830 - 10861' MD (Z1) Made runs w/CT conveyed perforating guns & shot 124' of perfs as follows: Ref. Log: BHCS 11/22/96. Ref. Log: BHCS 11/22/96. Used 3-3/8" carriers & shot the perfs 6 spf at 60 degree phasing at balanced pressures. Rigged down. POOH w/guns. Returned the well to production w/gas lift & obtained a valid well test. 0 !:t I I_1_ I IM G S E I::! b~ I r- ~:: S WELL LOG TRANSMITTAL To: State of Alaska April 9, 1997 Alaska Oil and Gas Conservation Comm. [.~xxr, t~z_oj Attn.' Lod Taylor / /~c~,__ 3001Porcupine Dr. O~L9 ~ ~. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D.S. 04-49, RE: AK-MW-60166 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22713-00. 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company sp,:,r, j-sur, CI F:! I I_1_ I IM 13 SEFI~/I C: E S WELL LOG TRANSMITTAL To: State of Alaska March 12, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs DS 04-49, AK-MW-60166 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 DS 04-49: 2" x 5" MD Gamma Ray Logs: 50-029-22713-00 2" x 5" TVD Gamma Ray Logs: 50-029-22713-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia _ 2)!/-~ F, "':'- ~ntilo~P 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company ~,.."~q ~ L, i ,i1,]::.] ~ [:.]--j GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10829 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 3/4/97 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape D.S. 4-49 96374 PEX,AIT, & BHC .CF-. "](.p ?--~ 9611 22 1 D.S. 4-49 96374 PEX-AIT 9611 22 1 1 D.S. 4-49 96374 PEX-CNL 9611 22 I 1 D.S. 4-49 96374 PEX-DENSITY 9611 22 I 1 D,S, 4-49 96374 PEX-NEUTRON/DENSITY 9611 22 I 1 D.S. 4-49 96374 PEX-TRIPLE COMBO 9611 22 I 1 D.S. 4-49 96374 PEX-COMBINATION SSTVD 9611 22 1 1 D.S. 4-49 96374 BHC 9611 22 1 1 D.S. 4-49 96374 BOREHOLEPROFILE 9611 22 1 1 SIGNED: ~~'-~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. MAR 0 7 1997 mr, O F! I I_1-- I I~1 G SEFI~./I C E S February 11, 1997 AOGCC Lori Taylor 3001 Porcupine Dr Anchorage, AK 99501 Re: Distribution of Survey Data 4-49 Dear Ms. Taylor: Enclosed are two hard copies of the above mentioned file(s). Well 4-49 MWD survey Tie-In point at 0.00' and a Projected survey at 11,138.00'. Please call me at 563-3256 if you have any questions or concerns. Regards, / · William T. Allen Operations Support Engineer Attachments. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company D Ft I I--I--I N 13 SEFlk/ICE S February 11, 1997 AOGCC Loft Taylor 3001 Porcupine Dr Anchorage, AK 99501 Re: Distribution of Survey Data 4-49 Dear Ms. Taylor: Enclosed are two hard copies of the above mentioned file(s). Well 4-49 ESS survey Tie-In point at 0.00' and a Projected survey at 3,942.00'. Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Operations Support Engineer Attachments. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company 12/4/96 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 A'i'TN: Sherrie NO. 10603 Company: Alaska Oil'& Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia Disk D.S. 4-49 RFT 961 11 6 I 1 D.S. 9-22 INJECTION PROFILE LOG 961 123 I 1 D.S. 9-35A PRODUCTION PROFILE LOG 961 12 2 I 1 D.S. 5-15B 96250 TDT-PBORAX -J:~-~['~' 960824 I Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Joh....~n, DATE: Chairma~"~ November 11, 1996 THRU' FILE NO: Blair Wondzeli, ~ P. I. Supervisor ~h~l FROM' Bobby Foster, .~~ SUBJECT: Petroleum Insp~'ctor AFGIKKDD.doc BOPE Test - Doyon14 ARCO - PBU - DS 4-49 PTD # 96--6-1--7-7 Monday, November 11, 1996: ! traveled this date to ARCO PBU well DS 4-49 being drilled by Doyon rig 14 and witnessed the initial BOPE test. I arrived at the rig at 1:00 PM and the test began at 1:30 PM. As the attached AOGCC BOPE Test Report shows~there were 8 failures. There were 2 flange leaks, 4 valves leaked in the choke manifold, a H2S sensor failed at the shale shaker and the annular preventer element leaked. At 6:00 PM the crew began changing out the annular preventer element and I stoodby. The ARCO grease crew came by and serviced all the~valves on the choke manifold, kill line and choke line. At 11 '30 PM the crew began testing and we concluded the test at 2:00 AM. The location was clean and there was good access to all areas of the rig. The rig was clean and ali other equipment seemed to be in good working order. While standingby for tes~t ! spoke with Nick Scales, SSD rig foreman, conceming the cement job on the surface casing. Nick said he pumped 1026 bbls. of 12.21b/gal with _9 pounds of Borax per bbl. and 81 bbls. of tail. He said he got back 145 bbls. of -- cement to the surface and USlT log would be run. I called Nick 11-12-96 and he said the log showed cement to surface, but they could not get all the way to botton due to contaninated mud. He said they got to 3540' and TD was 4069'. Summary: I witnessed the BOPE test on Doyon rig 14 drillng ARCO's DS 4-49 - test time 12.5 hours - 8 failures. Attachment: AFGIKKDD.XLS _X_ Unclassified Confidential (Unclassified if doc. removed ) STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Drlg Contractor: Operator: Well Name: Casing Size: 10. 75" Test: Initial X Workover: DOYON Rig No. 14 PTD # 96-83 ARCO ALASKA Rep.: DS4-4g Rig Rep.: Set @ 4069' Location: Sec. Weekly Other DATE: 11/11/96 Rig Ph.# 65g-4510 NICK SCALES MARK EGHOLM 26 T. llN R. f5E Meridian UM. Test MISC. INSPECTIONS: Location Gen.: OK Well Sign O Housekeeping: OK (Gert) Drl. Rig OK PTD On Location YES / Hazard Sec. YES ~ Standing Order Posted YES '~ FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Bali Type Inside BOP Quan. 1 I 1 Pressure P/F 500/5,000 F 500/5,000 500/5,000 500/5,000 BOP STACK: Quan. Annular Preventer 1 Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves 1 HCR Valves '2 Kill Line Valves ~ Check Valve Test Press 250/3000 500/5,000 P/F F/P P P P P P P MUD SYSTEM: Visual Alarm Trip Tank P P Pit Level Indicators P P , , Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P CHOKE MANIFOLD: No. Valves 15 No. Flanges 38 Manual Chokes f Hydraulic Chokes 1" Test Pressure 500/5,000 500/5,000 Functioned Functioned P/F ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained 2 Blind Switch Covers: Master: Nitgn. Btl's: Four Bottles 2500 Av. era~ie 3,000 I P 1,650 P minutes 35 sec. minutes' 50' sec. P Rem'ot~: P Psig. Number of Failures: 8 ,Test Time: '/2.5 Hours. Number of valves tested 25 Repair or Replacement of Failed Equipment will be made Within N/A days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7S42 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Failures: Annular preventer- replaced element, 4 valves in choke manifold- serviced and tested OK 2 flange leaks - #ghtened and tested OK., H2S sensor at shaker was bad- replaced. '" Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c - Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES NO X · III Waived By: Witn~ By: BOBBY D. FOSTER FI-021L (Rev.12/94) AFGIKKDD.XLS TONY KNOWLE$, GOVERNOR ~K& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 October 25, 1996 Dan Stoltz Senior Driilling Engineer ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Prudhoe Bay Unit 04-49 ARCO Alaska, Inc. Permit No: 96-171 Sur. Loc. 310'NSL, 4897'WEL, Sec. 26, TllN, R15E, UM Btmhole Loc. 19032qSL, 573'WEL, Sec. 26, T11N, R15E, UM Dear Mr. Stoltz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ..... STATE OF ALASKA ALASKA ,.,iL AND GAS CONSERVATION COIwMISSION PERMIT TO DRILL 2O AAC 25.005 la. Typeofwork I~Drill I-IRedrill ]lb. Typeofwell I-IExploratory I-IStratigraphic Test I~Development Oil : [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan RTE = 64.5' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028324 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 310' NSL, 4897' WEL, SEC. 26, T11 N, R15E (Not Final-As Staked) Prudhoe Bay Unit At top of productive interval 8. Well Number Number U-630610 2362' NSL, 1221' WEL, SEC. 26, T11N, R15E 04-49 At total depth 9. Approximate spud date Amount $200,000.00 1903' NSL, 573' WEL, SEC. 26, T11N, R15E 11/03/96 12. Distance to nearest property lineI 13, Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028323, 3377'I DS 04-39, 11.2' at 771' MD 2560 11079' MD / 8845' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} Kick Off Depth 1500' Maximum Hole Angle 30.8 o Maximum surface 3514 psig, At total depth (TVD) 8800' / 4400 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 110' 110' 260 sx Arctic Set (Approx.) 13-1/2" 10-3/4" 45.5# L-80 BTC 4042' 30' 30' 4072' 3825' 1840 sx CS III, 390 sx Class 'G' 9-7/8" 7-5/8" 29.7# L-80 BTC-Mod 9470' 30' 30' 9500' 8480' (see below) 9-7/8" 7-5/8" 29.7# 13Cr NSCC 785' 9500' 8480' 10285' 8830' 467 sx Class 'G' 6-3/4" 4-1/2" 12.6# 13Cr NSCT 944' 10135' 8811' 11079' 8845' 206 sx Class 'G' i19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production RECEIVED Liner 0CT 1 6 1996 Perforation depth: measured ORIGINAL Alaska 0,1 & Gas Cons. C0mmissi°n true vertical Anchorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Nam~Number:_ .~ , , ~Jim S/~ith, 564-5026 Prepared By Name/Number: Terrie Hubble, 564-4628 21.1 hereby certify that ~e/¢oregoin_~_~correct to the best of my knowledge Signed . - ..~_... Dan Stoltz /~(/~//,~ ~ Title Senior Drilling Engineer Date ?0 - /('3'- ~ (~ Commission Use Only Permit Number t APl Number I Approval Date See cover letter ~'~'-,'/,~'/I 50- ~-~/~ _.2....2_ '"~"'~I 1~'" ~_c~ for other requirements Conditions of Approval: Samples Required [] Yes ~ No Mud Log Required [] Yes ~ No Hydrogen Sulfide Measures '~fYes [] No Directional Survey Required ~ Yes [] No Required Working Pressure for BOPE [] 2M; []3M; l~ 5M; [] 1OM; [] 15M Other: Original o.~¢,~,~.~ ,.,,~,,c.~., :-i~. by order of Approved By m,.,,,;,.i ,A, I~,.~r,o-.'-,,,~, Commissioner the commission Date [ ~) "~..'~ "% Form 10-401 Rev. 12-01-85 Submit In Triplicate [Well Name: [04-49 Well Plan Summary Type of Well (producer or injector): [ Producer Surface Location: 310' FSL, 4897' FEL, Sec. 26, TI IN, R15E UM X=713202.88 , Y= 5952193.29 Target Location: 2362' FSL, 1221' FEL Sec.26, T1 IN, R15E UM X- 716817, Y=5954350 Bottom Hole Location: 1903' FSL, 573' FEL Sec. 26, TI IN, R15E UM X= 717478, Y=5953910 I AFE Number: 14J0338 ] I Estimated Start Date: I 11/3/96 I Rig: I Doyon #14 I Operating days to complete: 1 23 IMD: I 11079' I I TVD: 18845' rkb I IKBE: I64'5' I Well Design (conventional, slimhole, etc.): [ Slimhole Longstring l Obiective: I Sadlerochit- Zone 1 Formation Markers: Formation Tops MD TVD(BKB) Base Permafrost 1891 1890 10-3/4" casing 4072 3825 Set 10-3/4" casing 20'TVD above SV3 Do not drill into the SV3 prior to running the surface casing due to uncertainty of pressures in SV3 SV3 4095 3845 Beware of overpressure SV3 to West Sak K-15 5417 4980 Top Ugnu 6540 5945 West Sak 7460 6735 Set 7-5/8" DV tool at West Sak as will cement across the Ugnu after primary job. K-10 8269 7430 K-5 8898 7970 Build/turn starts 9284 8301 Start 8°/100, build and turn to horizontal LCU/Z2C 9667 8602 Z4 and Z3 are not present GOC 9823 8697 Z1B 10008 8779 7-5/8" casing 10285 8830 Set 7-5/8" at beginning of horizontal TD 11079 8845 TD after 800' of horizontal section RECEIVED OCT 1 6 1996 Well Plan Summary Page 1 Casing/Tubing Program: Hole S~ize ~sg/- Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H40 WELD 80 30'/30' 110'/110' 13-1/2" 10-3/4" 45.5# L-80 BTC 4042 30'/30' 4072'/3825' 9-7/8" 7-5/8" 29.7# L-80 BTCM 9470' 30'/30' 9500'/8480' 7-5/8" 29.7# 13CR NSCC 785' 9500¥8480' 10285¥8830' 6-3/4" 4 1/2" 12.6# 13CR NSCT 944 10135¥8811' 11079'/8845' NA 4 1/2" 12.6# 13CR NSCT 9652 30'/30' 9682'/8612' Logging Program: Open Hole Logs: 13-1/2" MWD Dir 9-7/8" MWD-GR Dir from surface shoe to intermediate casing point. Sample catcher from Zone 2 to TD. DP conveyed GR-RES-NEU-DEN-Sonic from 9-7/8"TD to top Zone2 Wireline RFT log across the Ugnu area, depths of pressure information will be provided by the Asset. 6-3/4" MWD-GR to TD Sample catchers and rig site geologist gathering and checking cuttings I Cased Hole Logs: Mud Program: Special design considerations Baradril-N Polymer system in 6-3/4" horizontal hole section. Higher mud weight in the surface hole possibly needed due to Cretaceous interval injection. Have the nearby Baroid mud plant advised of possible needs for heavy mud. Surface Mud Properties: I 13-1/2" hole section Density Marsh Yield 10 sec 10 rain pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 300 60 60 80 8.5 25 to to to to to to to 9.8 100 20 15 20 10 20 Intermediate Mud Properties: I 9-7/8" hole section Density Plastic Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.8 8 10 5 30 8.5 15 to to to to to to to 10.2 15 25 15 50 10.5 5 Production Mud Properties: [ 6-3/4" hole section Density LSRV Yield PV LSRV CL Fluid (PPG) (YP) Point Loss 8.5 16 33 5 50,000 25000 <6 to to to to to to to 9.0 20 35 7 60,000 25000 <6 Well Plan Summary Page 2 Hazards and Contingencies: This well is in the nearby proximity of the 4-19 "Grind and Inject" operations. The G&I operations have been discontinued for the summer months (since July 23,' 96) and will not be started until this well has run and cemented the intermediate casing (7-5/8" casing). Pressures in the subsurface interval below 4000'TVD are expected to be normalized from the higher pressures present during injection. There still exists the possibility of pressure in exess of the expected 9.7ppg, to minimize this risk the surface casing will be set above the T5 (SV3) sand which is above the uppermost interval of potential overpressure. Heavy weight mud will be on standby at the nearby Baroid mud plant to assist in the event pressures exceed the expected 9.7ppg. Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: [ KOP: 1500'MD, build at 2.5°/100' to tangent of I 30.8°, build at 8°/100, to horizontal Maximum Hole Angle: 30.8° in tangent, horizontal at bottom Close Approach Well: 4-39 is 11.2' away at 77 i'MD, 4-26 is 277' away at 6243'MD. Close the SSSV on the 4-39 and place a deepset plug on the 4-26. Cement Data: Casing/Liner 10-3/4" set at 4072'MD 7-5/8" set at 10285'MD 4-1/2" if solid cemented liner is run instead of slotted Lead: Sxs/Wt/Yield 1840/12.2/1.92 300% excess inperma, 50% excess to top of tail Tail: Sxs/Wt/Yield 390/15.8/1.15 50% excess with 750'MD of fillup none 467/15.8/1.15 none 206/15.7/1.19 Comments Cold Set IH & Class "Cj" Class "G" TOC-' +/-8680'MD Class "G"Acid resist. This will be a "screw-in" cement job on surface casing. The lead volume identified above is an estimate of the amount required based on historical data. Plan to have3000sx of lead on location for surface casing cementing. Well Plan Summary Page 3 Name Contacts Office Home Pager James E. Smith Drilling Eng. 564-5026 345-8660 275-4015 Dan Stoltz Drlg. Eng. Supr. 564-4922 349-6483 275-4570 David Nims Drilling Supt. 564-5219 346-2026 275-4539 Dana Coffield Susan Reynolds Mike Bill ARCO Geologist ARCO Pad Engr. ARCO G & I 263-4095 263-4579 263-4254 344-4468 Sperry Sun (mud plant/rig) Carl Hoeft/Pete Holtzman Crew at Doyon 14 Anadrill wireline/DP conveyed Amy Smith 659-2809 659-0204 659-2487 RECEIVED OCT 1 G 1996 AImmkm 011 & Om~ Oon~. Oommlmmion Anohorage Well Plan Summary Page 4 , . , , o o DS 04-49 Operations Summary MIRU drilling rig. NU and test diverter. Spud well and drill 13-1/2" hole to 1500' md. Kick off and build angle at 2.5°/100' to 30.8° at 52.97° azimuth by 2732'MD. Continue with constant angle and azimuth to the surface casing point at 4072'MD, 3825'TVD. Set 10-3/4" casing and cement same to surface. Plan to run a screw in float collar for cementing to surface. Nipple up BOP's and test same to 500/5000 psi. Test casing to 3000 psi for 30 minutes. Note AOGCC witness or waiver on the morning report. P/U 9-7/8" BHA,(with MWD-GR) drill 20' new hole and perform LOT. Carefully monitor for overpressure from below the casing shoe until the full Ugnu has been drilled. Maintain close contact with the Bariod mud plant who can provide high weight mud if required. Contiunue to hold the borehole tangent to 9284'MD, 8301'TVD. At that depth begin a build and turn at 8°/100, to the final horizontal section beginning. The wellbore will be at 88.92° angle and 125.27° azimuth at the 7-5/8" casing depth. After a wiper trip POOH to run DP conveyed logs from the top of the SAD (9667'MD) to TD. These logs will include: GR-RES-NEU-DEN-Sonic. If requested by the Asset an additional run of RFT logs will be made across the Ugnu interval. Make a cleanout run. POOH and lay down drill pipe. Run 7-5/8" L-80 and 13 chrome casing and cement same, displacing with mud. Open the DV tool placed at about 7500'MD (below the Ugnu) and cement the annulus to 500' below the 10-3/4" casing shoe. After WOC for 4 hours, pump down the 10-3/4" X 7-5/8" annulus to ensure that the annulus is open for future pressure monitoring. Test casing to 3500 psi for 30 minutes. Test surface equipment to 500/5000 psi. P/U 6-3/4" BHA, MWD w/GR & 3-1/2" drill string. Drill out with the displacement mud which is to be at least 0.5 ppg heavier than the horizontal drilling fluid, then displace to the Baradrill-N system. Drill ahead and continue the lateral section per directional program. TD for the section is prognosed at 11079'MD and 8845'TVD. . Run 4-1/2" chrome tubing (slotted and solid) to place the packer and hanger with 150' of overlap into the 7-5/8", be sure to run an "X" nipple 1 joint below the packer. Run 4-1/2" chrome tubing to place the WLEG at 100' above the top of the SAD (approx. 9567'MD). The SSSV on this well is to be placed near 500'MD. 8. ND BOP and NU tree assembly. Test tree assembly to 5000 psi. 9. Freeze protect the annulus. 10. 11. Set packer, test tubing. Test annulus. Secure well, release rig. RECEIVED Well Plan Summary Page 5 0c~-03-'96 04:40P Anadrjl] DPC 907 _3A4 2160 P.05 SHARED SERVICES DRILLING i ii · 0S04-49 (P2)' VERTICAL SECTION;; VIEW i ill i i i i Section at: 125.27 TVD Scale' 1 inch : 1200 feet Dep Scale · i inch = 1200 feet I Narker Identification MD 8K8 SECTN INCLN ) . A) KB 0 0 0 0.00 _ .........B-- __ -----~ ~..~~-~-~-f' B) KOP/BUILO 2.5/t00 1500 t500' 0 0.00 C) END.2:5/IO0 BUILD 2732 2674 98 30.80 ......... ~ O) 7-5/8" CASING POINT 4107 3855. 312 30.80 ) ,---- -t~ E).CURVE 8/100 9284 8301-, 1118 30.80 - - .i FI 5-1/2" CASING POINT 10285 8829 ' ~8~4 88.92 Gl E~ 8/100 CURVE' 10285 8829 - 18i4 88.92 )- :~ . .H) TARGET .102~ 8829 igt4 88.92 . I) 3-~/2" CASING POINT ~079 8844" 2608 88.92 C. ~ .' J) -TO 1~079 8844 2608 88.92 , : ~ ..... '~ ~- ~¢ ., .. J - I . .  ............. . ', _ ' I ~5 - ~- -' .... ........... ~ 8 '~ ....... ,~ .......... F I ............ .. 0 ~00 ~200 lflO0 2~00 ~000 ~fiO0 4200 aflO0 5~00 SO00 fifiO0 7200 lflO0 Section Departure (~aori]] (c)~ 044~2 3.0b.06 ~: 24 ~ P) i, i Anadri ll Schlumberger iii mil i Iiii I DS04-49 (P2) PLAN VIEW CLOSURE · 4607 feet at Azimuth 69,.75 DECLINATION.' +28.573' IE) SCALE · ~ inch = 800 feet DRA~fN ' 03 Oct ~9 i i Marker Identification A) KB' B) KOP/BUILD ~.5/100 C) END ~.§/~00 BUILD D) 7-§/§" CASING POINT E) CURVE 8/100 F.)..5~1/2' CASING POINT G) END 8/100 CURVE, H) TARGET I) 3-1/2' CASING POINT d) TD SHARED ! ~1 I 0 ~500 2732 4107 9284 (0285 10285 10285 1 t079 t 1079 SER VICES N/S E/W 0 N 0 E 0 N 0 E 195 N 258 E 619 N 820 E 2215 N 2936 E 2053 N 3674.,.E. 2053 ,N 3674 E 2053 N 3674 E 159§ N 4322 E t595 N 4322 E ' "DRTLLTNG i Illlll I I I Illl m m i! "FO TUDY ONLY 400 0 400 800 1200 1600 2000 2400 2800 3200 3600 4000 4400 4800 5200 5600 6000 6400 6800 <- WEST' EAST -> t~naOrill (c)96 0449P2 3,0b,06 4:24 PM P) 0 0 > 1000 2000 3OOO 400O 5O0O 6OOO 7OO0 8OOO 9OOO 10000 11000 12000 04-49 Estimated Pressure Profiles  Fracture Pressure Pore Pressure 8 9 10 11 12 13 14 EMW (ppg) 15-46 Estimated Pressure Profiles DS 15-Pad Data Sheet WELL PERMIT CHECKLIST COMPANY/~~ '" GEOLAREA :IELD & POOL ~ ~ A ~"~-' INIT CLASS ~DMINISTRATIO~ 1. Permit fee attached ....................... N 2. Lease number appropriate ................... N 3. Unique well name and number ................ N 4. Well located in a defined Pool ................. N 5. Well located proper distance from dflg unit boundary ..... N 6. Well locsted proper distance from off, er we~s. N 7. Sufficient acr~e available in drilling unit. N 8. If deviated, is wellbore plat included .............. N 9. Operator only aff~ party .................. t N 10. Operator has appropriate bond in force ............ ~. N 11. Permit can be issued without conservation order ...... '|' Y N LE.~R DAT~. / 12. Permit can be issued without administrative approvaJ .... / N ~.~____~'~,.~///~'~;;~ 13. Can permitbe approved before 15-claywalL ........ ~, N --NGINEERING .... ~OLOGY ....... Conductor string provided .................. . ~-/~1 Surface ca~ng protects all known USDWs .......... ~,~N CMT vol adequate to circulate on conductor & surf csg . . . (~.~N CMT vol adequate to tie-in long s~ng to surf csg ...... ~ CMl' will cover all known productive horizons ......... Casing designs adequate for C, T, B & permafr~t. ..... N Adequate tankage or reserve pit. .............. If a re-clfill, has a 10-403 for abndnmnt been approved .... Adequate wellbore separa§on proposed ........... ~,~N If diverter required, is it adequate ................ N Drilling fluid program schemstic & equip list adequate .... .~" N BOPEs adequate ....................... ' N BOPE press rating adequate; test to ,~ ~ psi N ~ ,'~ Choke manifold complies w/APl RP-53 (May 84) ...... V Work will occur without operation shutdown .......... .~y N is presence of H2S gas probable .............. N.( 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. Permit can be issued w/o hydrogen sulfide measures ..... Y 31. Data presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ............ N 33. Seabed condil~on survey (if off-shore) .......... Y N 34. Contact name/phone for weekly progress repo~,. .... Y N Jexploratory ono'J ,P~_R DAT. E / PROGRAM: exp [] dev~7~l~reddl [] serv [] wellbore seg [] ann. disposal para req [] UNIT# //~,,_<","2 ON/OFF SHORE ~ ri .) REMARKS GEOLOGY: ENGINEERING: COMMISSION: W BE ~~J'~l~,3 DWi' JDH~ JDN Comments/Instructions: o Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of. information. S~erry-Sun Drilling Services LIS Scan Utility Fri Apr 04 13:00:13 1997 Reel Header Service name ............. LISTPE Date ..................... 97/04/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Services Library. Scientific Technical Tape Header Service name ............. LISTPE Date ..................... 97/04/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services WELL NAME: DS 04-49 API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: Scientific Technical MWD RUN 3 AK-MW-60166 STEVE LATZ NICK SCALES RECEIVED APR 0 Alaska Oil & Gas Co~s. Commission A~chor~e 500292271300 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 04-APR-97 MWD RUN 4 MWD RUN 5 AK-MW-60166 AK-MW-60166 MARK HALL MARK HALL KIRK WHITE KIRK WHITE JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: MWD RUN 6 AK-MW-60166 MARK HALL KIRK WHITE MWD RUN 7 MWD RUN 8 AK-MW-60166 AK-MW-60166 T. MCGUIRE T. MCGUIRE KIRK WHITE NICK SCALES 26 liN 15E 310 4897 66.10 64.60 GROgND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 30.40 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.500 10.750 4069.0 9.875 7.875 10349.0 6.750 11138.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL GAMMA RAY DATA (SGRD) IS DOWNHOLE RECORDED. 3. MWD RUNS 1 AND 2 ARE DIRECTIONAL ONLY AND ARE NOT PRESENTED. 4. MWD RUNS 3 THROUGH 8 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP). 5. GAMMA RAY DATA (SGRD) FROM 7929'MD, 7143'TVD TO 7943'MD, 7155'TVD WAS MEASURED AFTER DRILLING (MAD). 6. THIS WELL REACHED A TOTAL DEPTH (TD) OF ll138'MD, 8844'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 4002.0 11076.5 ROP 4082.0 11136.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 4002.0 8961.5 8966.5. 8969.0 8986.0 8992.0 8993.5 9008.0 9012.0 9016.0 9017.5 GR 4000 0 8959 5 8962 0 8964 5 8982 5 8989 5 8990 5 9OO5 5 9008.0 9013.0 9014.5 EQUIVALENT UNSHIFTED DEPTH 9021 5 9025 0 9028 5 9030 0 9032 0 9038 5 9041 0 9043 0 9051 0 9054 5 9057 0 9058 5 9059 5 9061 0 9062 5 9063 5 9065 0 9066 5 9068 0 9069 5 9087 5 9091 0 9092 5 9098 5 9102 0 9118 0 9120 5 9123 0 9124.5 9128 0 9130 0 9133 0 9137 0 9140 0 9155 5 9180.0 9183.5 9185 5 9187 5 9190 0 9192 5 9194 5 9210 0 9212.5 9216.5 9221.0 9223.0 9224 5 9227 0 9230 5 9232 0 9234 0 9235 5 9238 5 9241 5 9243.0 9245 0 9258 0 92 63 5 92 67 0 9271 5 9278 5 9282 5 9304 5 9018.5 9022.0 9027.5 9028 0 9029 5 9037 0 9039 5 9040 5 9049 0 9053 0 9055 5 9056 5 9057 5 9059.0 9060.0 9061.5 9062.5 9065.0 9066.0 9067.0 9087.5 9090.5 9091.5 9098.0 9100.0 9116 5 9118 0 9120 5 9123 0 9124 5 9127 0 9132 0 9136.5 9139.0 9155.0 9178.0 9180.5 9183.0 9185.0 9187 0 9192 5 9194 0 9208 5 9212 0 9216 5 9220 5 9222 0 9223 0 9224 5 9228 0 9229 0 9232 0 9234 0 9238 5 9241 5 9243 5 9246 0 9258 0 9262 0 92 66 5 9269 0 9277 0 9282 0 9302 0 9306 5 9308 5 9310 0 9315 0 9325 5 9329 5 9331 0 9332 0 9338 5 9345 5 9347 5 9351 0 9359 0 9363 0 9365 5 9367 0 9385 0 9389 5 9391 0 9394 0 9395 5 9398 5 9402 0 9407 5 9415 0 9418 5 9428 0 9430 0 9433 5 9436 5 9439 0 9443 0 9446 5 9448 0 9453 0 9459 5 9461 5 9464 0 9467 0 9471 0 9475 0 9476 5 9479 0 9484 0 9488 5 9490 5 9493 0 9494 0 9496 5 9498 0 9502 0 9503 0 9506 5 9509 0 9514 5 9516 0 9529 0 9532 5 9536 0 9545 0 9547 5 9552 5 9555 5 9559 5 9304.5 9306.5 9308.5 9313.0 9324.5 9330.5 9332.5 9334.0 9338.5 9343.0 9346.5 9348.5 9357. 0 9360.0 9365.0 9366.5 9383.0 9386.0 9387 5 9390 5 9392 0 9395 5 9398 5 9403 0 9412 0 9415 0 9426 5 9429 0 9432 5 9434 5 9436 0 9439 5 9443 0 9445 5 9452 0 9457 0 9459 0 9462.5 9465.0 9468.5 9472.0 9473.5 9475.5 9481.5 9485.5 9488.0 9492.0 9494 5 9496 5 9497 5 9499 0 9500 0 9503 0 9505 5 9510 5 9512 5 9530 0 9533 0 9538 0 9547 0 9550 5 9554 5 9558 0 9560 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $ 9565 5 9568 0 9570 5 9576 5 9581 5 9587 5 9589 5 9591 0 9627 0 9638.5 9644.5 9661.0 9671.5 9691.5 9761.0 9786.0 9788 0 9795 0 9797 5 9800 0 9850 0 9852 0 9870 0 9878 0 9893 5 9899 5 9928 0 9929 5 9945 5 9952 5 9954 5 9981 5 9984 5 9986 5 0050 0 0066 5 0119 5 0122 5 0124 5 0140 0 0151.5 0167.5 0171.0 0172.0 0174.5 0180.0 0182.5 0185.5 0202.5 0216.0 0227.5 1136.5 MERGED DATA SOURCE PBU TOOL CODE 9567 0 9569 5 9571 5 9577 5 9581 5 9589 5 9591 0 9592.0 9626.5 9639.5 9645.0 9661.5 9672 0 9691 5 9763 5 9787 0 9789 0 9796 5 9798 5 9800.0 9855.5 9857.0 9872.5 9881.0 9896.0 9900.0 9928.0 9932.5 9945.5 9953.0 9955.0 9981.5 9985.5 9987.0 10052.0 10069.5 10122 0 10124 0 10127 0 10143 0 10154 0 10168 5 10174 5 10175 5 10177 0 10180 5 10183 5 10186 5 10204 5 10218 5 10228 0 11137 0 BIT RUN NO 3 4 5 6 7 8 MERGE TOP 4080.0 7020.0 8020.0 9588.0 10113.0 10348.0 MERGE BASE 7020 0 8020 0 9588 0 10113 0 10348 0 11138 0 REMARKS:- MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD AAPI 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 4002 11136.5 7569.25 14270 4002 GR 8.96 282.34 69.3544 14150 4002 ROP 6.59 1397.72 118.71 14110 4082 Last Reading 11136.5 11076.5 11136.5 First Reading For Entire File .......... 4002 Last Reading For Entire File ........... 11136.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR'TOOL CODE START DEPTH GR 3989.0 ROP 4080.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ~qGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 STOP DEPTH 6929.0 7019.5 15-NOV-96 MSC V.1.32 DEP V.2.04/NGP V.5.74 MEMORY 7020.0 4080.0 7020.0 29.6 31.9 TOOL NUMBER NGP 165 9.880 9.9 LSND 9.80 54.0 9.0 1400 5.6 .000 .000 .000 .000 53.9 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 AAPI 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 3989 7019.5 5504.25 6062 3989 GR 12.28 86.81 49.0096 5881 3989 ROP 6.59 631.18 133.404 5880 4080 Last Reading 7019.5 6929 7019.5 First Reading For Entire File .......... 3989 Last Reading For Entire File ........... 7019.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Con~ment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 6930.5 7929.0 ROP 7021.5 8019.0 $ LOG HEADER DATA DATE LOGGED: 17-NOV-96 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : MSC V.1.32 DEP V.2.04/NGP V.5.74 MEMORY 8020.0 7020.0 8020.0 HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 30.4 30.9 TOOL NUMBER NGP 156 9.880 9.9 LSND 9.90 47.0 9.0 1500 5.0 .000 .000 .000 .000 53.9 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 AAPI 4 1 68 4 2 ROP MWD 4 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 6930.5 8019 7474.75 2178 6930.5 GR 35.65 200.63 111.737 1998 6930.5 ROP 14.08 285.51 105.635 1996 7021.5 Last Reading 8019 7929 8019 First Reading For Entire File .......... 6930.5 Last Reading FoY Entire File ........... 8019 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 7929.5 9511.0 ROP 8021.0 9587.0 $ LOG HEADER DATA DATE LOGGED: 19-NOV-96 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 25.5 MAXIMUM ANGLE: 36.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MSC V.1.32 DEP V.2.04/NGP V.5.74 MEMORY 9588.0 8020.0 9588.0 TOOL NUMBER NGP 165 9.880 9.9 LSND MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 9.90 65.0 9.0 1500 5.0 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 5 FT/H 4 1 68 4 2 GR MWD 5 AAPI 4 1 68 8 3 53.9 First Name Min Max Mean Nsam Reading DEPT 7929.5 9587 8758.25 3316 7929.5 ROP 18.77 322.43 124.364 3133 8021 GR 26.75 282.34 96.4832 3164 7929.5 Last Reading 9587 9587 9511 First Reading For Entire File .......... 7929.5 Last Reading For Entire File ........... 9587 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9503.5 ROP 9581.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10036.5 10113.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S) : MUD PH: MUD CHLORIDES PPM) : FLUID LOSS (CB : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: I~fUD CAKE AT MT: NEUTRON TOOL MATRIX: I¢~AT RI X DENSITY: HOLE CORRECTION (IN) : 20-NOV-96 MSC V.1.32 DEP V.2.04/NGP V.5.74 MEMORY 10113.0 9588.0 10113.0 41.9 71.6 TOOL NUMBER NGP 320 9.880 9.9 LSND 9.90 57.0 9.0 1100 5.0 .000 .000 .000 .000 13.5 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999,25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 AAPI 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9503.5 10113 9808.25 1220 9503.5 GR 8.96 107.61 38.8164 1067 9503.5 ROP 17.74 570.3 70.3892 1065 9581 Last Reading 10113 10036.5 10113 First Reading For Entire File .......... 9503.5 Last Reading For Entire File ........... 10113 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER~ 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10038.5 ROP 10116.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINII~JM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10270.5 10347.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S) : MUD PH: I~UD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHF~4) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: ~ATRIX DENSITY: HOLE CORRECTION (IN): TOOL STTdqDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined 21-NOV-96 MSC V.1.32 DEP V.2.04/NGP V.5.74 MEMORY 10348.0 10113.0 10348.0 71.2 86.8 TOOL NUMBER NGP 156 9.880 9.9 LSND 9.80 57.0 9.0 1400 5.0 .000 .000 .000 .000 12.2 .6 Absent-valu~ ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 AAPI 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10038.5 10347.5 10193 619 10038.5 GR 45.59 110.61 69.0871 465 10038.5 ROP 30.61 483.28 120.881 463 10116.5 Last Reading 10347.5 10270.5 10347.5 First Reading For Entire File .......... 10038.5 Last Reading For Entire File ........... 10347.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEA~DER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SU~RY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10123.5 11077.0 ROP 10185.5 11137.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): 30-NOV-96 MSC V.1.32 DEP V.2.04/NGP V.5.74 MEMORY TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM A/~GLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAP~4A PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMS4) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 11138.0 10348.0 11138.0 87.5 93.8 TOOL NUMBER NGP 165 6.750 6.8 SHEARDRL 8.90 51.0 9.5 12000 5.6 .000 .000 .000 .000 13.5 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 AAPI 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEFT 10123.5 11137 10630.2 2028 10123.5 GR 23.13 149.57 54.222 1908 10123.5 Last Reading 11137 11077 ROP ' 14.64 1397.72 124.12 1904 10185.5 11137 First Reading For Entire File .......... 10123.5 Last Reading For Entire File ........... 11137 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/04/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/04/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 97/04/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File RECEIVED ~AR 07 1997 * ALASKA COMPUTING CENTER . ****************************** * * ....... SCHLUMBERGER ....... * ****************************** COMPANY NAME : ARCO ALASKA INC. WELL NAME : DS 4-49 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292271300 REFERENCE NO : 96374 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/02/24 ORIGIN : FLIC REEL NAME : 96374 CONTINUATION # PREVIOUS REEL : CO~4~NT : ARCO A_L~SKA INC, DS 4-49, PRUDHOE BAY, API #50-029-22713-00 PAGE: **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/02/24 ORIGIN : FLIC TAPE NAME : 96374 CONTINUATION # : 1 PREVIOUS TAPE : CO~ENT : ARCO ALASKA INC, DS 4-49, PRUDHOE BAY, API #50-029-22713-00 TAPE HEADER Prudhoe Bay OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING DS 4-49 500292271300 ARCO ALASKA INC. SCHLUMBERGER WELL SERVICES 21-FEB-97 RUN 1 96374 Carlo A. Yon Haywood RUN 2 RUN 3 26 liN 15E 310 4897 66.10 64.60 30.40 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 10.750 4069.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 3RD STRING PRODUCTION STRING CONTAINED HEREIN IS THE DATA ACQUIRED ON ARCO ALASKA, INC. WELL DS 4-49. NO DEPTH SHIFTS WERE APPLIED TO THIS DATA. TOOLS WERE LOGGED USING TLC SYSTEM. TOOLS USED WERE: PLATFORM EXPRESS (PEX), AND BOREHOLE COMPENSATED SONIC (BHC) AND ARRAY INDUCTION RESISTIVITY TOOL (AIT). $ PAGE: **** FILE HEADER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLEMAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE .............. AIT CNT BCS SDN $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 10332.0 8960.0 10312.0 8960.0 10295.0 8960.0 10325.0 8960.0 BASWLINEDEPTH .............. $ MERGED DATA SOURCE LDWG TOOL CODE AIT AIT AIT $ REMARKS: .......... EQUIVALENT UNSHIFTED DEPTH .......... AIT CNT BCS SDN RUN NO. PASS NO. MERGE TOP MERGE BASE 1 2 10222.0 10332.0 1 1 10124.0 10222.0 1 2 8960.0 10124.0 THIS FILE CONTAINS CLIPPED EDITED MAIN PASS OPEN HOLE DATA. NO DEPTH SHIFTS WERE APPLIED TO THIS DATA AS IT IS CONSIDERED TO BE THE PRIMARY DEPTH CONTROL LOG. LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: DUE TO A TEMPORARY POWER OUTAGE TO THE AIT TOOL A SECTION FROM THE REPEAT PASS OF THE AIT WAS SPLICED INTO THE MAIN LOG DATA OVER THE INTERVAL FROM 10222' TO 10124'. ALL CURVES IN THIS FILE ARE SAMPLED AT 0.5' RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 132 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 7 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NA~E SERVUNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553794 O0 000 O0 0 1 1 1 4 68 0000000000 GR AIT GAPI 553794 O0 000 O0 0 1 1 1 4 68 0000000000 TENS AIT LB 553794 O0 000 O0 0 1 1 1 4 68 0000000000 TEND AIT LB 553794 O0 000 O0 0 1 1 1 4 68 0000000000 MRES AIT 0H~553794 O0 000 O0 0 1 1 1 4 68 0000000000 MTEMAIT DEGF 553794 O0 000 O0 0 1 1 1 4 68 0000000000 DEVI AIT DEG 553794 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS 553794 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNT CPS 553794 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT ClTT CPS 553794 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT cArT CPS 553794 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNT 553794 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT 553794 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNT PU-S 553794 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 4 NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) CPHI CNT PU-S 553794 O0 000 O0 0 1 1 1 4 68 0000000000 DT BCS US/F 553794 O0 000 O0 0 1 1 1 4 68 0000000000 CALl SDN IN 553794 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 553794 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN BN/E 553794 O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 553794 O0 000 O0 0 1 1 1 4 68 0000000000 MSFL SDN 0tff4~553794 O0 000 O0 0 1 1 1 4 68 0000000000 MINVSDN OHMM553794 O0 000 O0 0 1 1 1 4 68 0000000000 ~4NOR SDN OH~fi~553794 O0 000 O0 0 1 1 1 4 68 0000000000 ATiO AIT OH~4 553794 O0 000 O0 0 1 1 1 4 68 0000000000 AT20 AIT OH~4 553794 O0 000 O0 0 1 1 1 4 68 0000000000 AT30 AIT OH~4 553794 O0 000 O0 0 1 1 1 4 68 0000000000 AT60 AIT OH~ff4 553794 O0 000 O0 0 1 1 1 4 68 0000000000 AT90 AIT OH~M553794 O0 000 O0 0 1 1 1 4 68 0000000000 AFiO AIT 0H~94553794 O0 000 O0 0 1 1 1 4 68 0000000000 AF20 AIT 0H~553794 O0 000 O0 0 1 1 1 4 68 0000000000 AF30 AIT OH~ff4553794 O0 000 O0 0 1 1 1 4 68 0000000000 AF60 AIT 0H~4~553794 O0 000 O0 0 1 1 1 4 68 0000000000 AF90 AIT OH~4M553794 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. MRES.AIT 0.713 MTEM. AIT 167.247 DEVI.AIT -999 CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT -999 NRAT. CNT -999.250 NPHI.CNT -999.250 CPHI.CNT -999 CAL1.SDN -999.250 DRHO.SDN -999.250 PEF. SDN -999 MSFL.SDN -999.250 MINV. SDN -999.250 I~VOR.SDN -999 AT20.AIT 25.197 AT30.AIT 30.048 AT60.AIT 35 AFiO.AIT 19.179 AF20.AIT 27.820 AF30.AIT 31 AF90.AIT 32.823 10332.000 GR.AIT -999.250 TENS.AIT 1047 000 TEND.AIT 158.636 250 CNTC. CNT -999.250 250 CRAT. CNT -999.250 250 DT. BCS -999.250 250 RHOB.SDN -999.250 250 ATIO.AIT 18.029 796 AT90.AIT 32.487 976 AF60.AIT 35.240 DEPT. ~ES . AI T CFTC. CNT 624 NRA T . CNT 3 CALl. SDN -999 MSFL. SDN - 999 AT20 .AIT -999 AFl O. AIT -999 AF90. AIT - 999 8960.000 GR.AIT 185.400 TENS.AIT 320.000 TEND.AIT 1258.562 0 888 MTEM. AIT 147.187 DEVI.AIT 27.154 CNTC. CNT 1777.219 880 FCNT. CNT 556.583 NCNT. CNT 1966.523 CRAT. CNT 2.966 159 NPHI. CNT 35.463 CPHI. CNT 36.151 DT.BCS 89.700 250 DRHO.SDN -999.250 PEF. SDN -999.250 RHOB.SDN -999.250 250 MINV. SDN -999.250 MNOR.SDN -999.250 ATiO.AIT -999.250 250 AT30.AIT -999.250 AT60.AIT -999.250 AT90.AIT -999.250 250 AF20.AIT -999.250 AF30.AIT -999.250 AF60.AIT -999.250 250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN ~ER : TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SU~fivi~Y FILE HEADER FILE NUMBER 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 2 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... AIT 10344.0 8960.0 P~ 10344.0 8960.0 BHC 10344.0 8960.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 22-NOV-96 8B0-538 2100 21-NOV-96 1100 22-NOV-96 10348.0 10348.0 8960.0 10332.0 1800.0 TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): ~ CAKE AT (BHT): AMS- A SLS - WA HILTB -DTB 9.875 4069.0 4069.0 Salt Water Based 9.80 52.0 9.0 1. 830 87.0 1. 670 78.0 1. 890 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform Express: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (RXO) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO"). Deviation is 27.30 DEG at start depth, and 85 DEG at TD. This is the raw PEX/BHC/AIT data at 0.5' sample rate. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 160 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 6 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553794 O0 000 O0 0 2 1 1 4 68 0000000000 GR AIT GAPI 553794 O0 000 O0 0 2 1 1 4 68 0000000000 TENS AIT LB 553794 O0 000 O0 0 2 1 1 4 68 0000000000 HTENAIT LB 553794 O0 000 O0 0 2 1 1 4 68 0000000000 I~ES AIT OHMM553794 O0 000 O0 0 2 1 1 4 68 0000000000 MTEMAIT DEGF 553794 O0 000 O0 0 2 1 1 4 68 0000000000 GDEVAIT DEG 553794 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC PEX CPS 553794 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC PEX CPS 553794 O0 000 O0 0 2 1 1 4 68 0000000000 RCFT PEX CPS 553794 O0 000 O0 0 2 1 1 4 68 0000000000 RCNT PEX CPS 553794 O0 000 O0 0 2 1 1 4 68 0000000000 TNRA PEX 553794 O0 000 O0 0 2 1 1 4 68 0000000000 RTNR PEX 553794 O0 000 O0 0 2 1 1 4 68 0000000000 TNPH PEX PU 553794 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI PEX PU 553794 O0 000 O0 0 2 1 1 4 68 0000000000 NPOR PEX PU 553794 O0 000 O0 0 2 1 1 4 68 0000000000 DT BHC US~F553794 O0 000 O0 0 2 1 1 4 68 0000000000 TT1 BHC US 553794 O0 000 O0 0 2 1 1 4 68 0000000000 TT2 BHC US 553794 O0 000 O0 0 2 1 1 4 68 0000000000 TT3 BHC US 553794 O0 000 O0 0 2 1 1 4 68 0000000000 TT4 BHC US 553794 O0 000 O0 0 2 1 1 4 68 0000000000 HCAL PEX IN 553794 O0 000 O0 0 2 1 1 4 68 0000000000 RHOZ PEX G/C3 553794 O0 000 O0 0 2 1 1 4 68 0000000000 HDRA PEX G/C3 553794 O0 000 O0 0 2 1 1 4 68 0000000000 PEFZ PEX 553794 O0 000 O0 0 2 1 1 4 68 0000000000 DPHZ PEX PU 553794 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) IOIIN PEX OH3ff4553794 O0 000 O0 0 2 1 1 4 68 0000000000 tOINO PEX 0H3~4553794 O0 000 O0 0 2 1 1 4 68 0000000000 RXOZ PEX 0H3~4553794 O0 000 O0 0 2 1 1 4 68 0000000000 ATIO AIT 0H~01553794 O0 000 O0 0 2 1 1 4 68 0000000000 AT20 AIT OHMM553794 O0 000 O0 0 2 1 1 4 68 0000000000 AT30 AIT 0t~4M553794 O0 000 O0 0 2 1 1 4 68 0000000000 AT60 AIT 0H3~4553794 O0 000 O0 0 2 1 1 4 68 0000000000 AT90 AIT OH~k4553794 O0 000 O0 0 2 1 1 4 68 0000000000 AFiO AIT 0H3~4553794 O0 000 O0 0 2 1 1 4 68 0000000000 AF20 AIT Otff4M 553794 O0 000 O0 0 2 1 1 4 68 0000000000 AF30 AIT 0H~4~553794 O0 000 O0 0 2 i 1 4 68 0000000000 AF60 AIT 0101M553794 O0 000 O0 0 2 1 1 4 68 0000000000 AF90 AIT OHT4M553794 O0 000 O0 0 2 1 1 4 68 0000000000 AIBD AIT IN 553794 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10344.000 GR.AIT 70.755 TENS.AIT 1990.000 HTEN. AIT MRES.AIT 0.713 MTEM. AIT 167.247 GDEV. AIT -999.250 CNTC. PEX CFTC.PEX 1313.567 RCFT. PEX 1190.811 RCNT. PEX 2683.893 TNRA.PEX RTNR.PEX 2.261 TNPH. PEX 20.315 NPHI.PEX 20.137 NPOR.PEX DT. BHC 98.700 TT1.BHC 638.000 TT2.BHC 442.800 TT3.BHC TT4.BHC 421.600 HCAL.PEX 9.178 RHOZ.PEX -999.250 HDRA.PEX PEFZ.PEX -999.250 DPHZ.PEX 60721.211 HMIN. PEX 1.972 H~NO.PEX RXOZ.PEX 11.291 ATiO.AIT 15.307 AT20.AIT 27.848 AT30.AIT AT60.AIT 35.589 AT90.AIT 31.305 AFiO.AIT 15.303 AF20.AIT AF30.AIT 31.021 AF60.AIT 34.174 AF90.AIT 31.138 AIBD.AIT -58 409 2773 584 2 137 20 049 621 200 -999 250 3 097 29 734 27.877 9.178 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE ' FLIC VERSION · O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE H~ER FILE NUMBER 3 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.25 FILE SU~9~ARY VENDOR TOOL CODE START DEPTH AIT 10344.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 8960.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: 22-NOV-96 8B0-538 2100 21-NOV-96 1100 22-NOV-96 10348.0 10348.0 8960.0 10332.0 1800.0 TOOL NUMBER ........... AMS - A SLS - WA HILTB -DTB 9.875 4069.0 4069.0 Salt Water Based LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 10 MUD DENSITY (LB/G): 9.80 MUD VISCOSITY (S) : 52.0 MUD PH: 9.0 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 1. 830 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): 1. 670 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1. 890 MUD CAKE AT (BHT): 87.0 78.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform Express: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (RXO) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO"). Deviation is 27.30 DEG at start depth, and 85 DEG at TD. This is the raw AIT data at 0.25' sample rate. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 21 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 11 TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553794 O0 000 O0 0 3 1 1 4 68 0000000000 ATiO AIT OHMM553794 O0 000 O0 0 3 1 1 4 68 0000000000 AT20 AIT 0H~4553794 O0 000 O0 0 3 1 1 4 68 0000000000 AT30 AIT OH~ff4553794 O0 000 O0 0 3 1 1 4 68 0000000000 AT60 AIT OPfi~M553794 O0 000 O0 0 3 1 1 4 68 0000000000 AT90 AIT OH~ff~553794 O0 000 O0 0 3 1 1 4 68 0000000000 AFiO AIT OHMM553794 O0 000 O0 0 3 1 1 4 68 0000000000 AF20 AIT 0H~553794 O0 000 O0 0 3 1 1 4 68 0000000000 AF30 AIT OP2~M553794 O0 000 O0 0 3 1 1 4 68 0000000000 AF60 AIT OH~M553794 O0 000 O0 0 3 1 1 4 68 0000000000 AF90 AIT 0H~553794 O0 000 O0 0 3 1 1 4 68 0000000000 AIBD AIT IN 553794 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10344. 000 ATIO.AIT 15. 307 AT20.AIT 27. 848 AT30.AIT AT60.AIT 35. 589 ATgO.AIT 31 . 305 AFiO.AIT 15. 303 AF20.AIT AF30.AIT 31. 021 AF60.AIT 34.174 AF90.AIT 31. 138 AIBD.AIT DEPT. 8960.250 ATIO.AIT 2.172 AT20.AIT 2.187 AT30.AIT AT60.AIT 2.213 AT90.AIT 2. 095 AFiO.AIT 2. 140 AF20.AIT AF30.AIT 2.219 AF60.AIT 2.106 AF90.AIT 2. 004 AIBD.AIT 29. 734 27. 877 9.178 2.230 2.176 9.659 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION ' O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 12 **** FILE H~ER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE · 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE AUgM~ER 4 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 2 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 10344.0 8960.0 PEX 10344.0 8960.0 BHC 10344.0 8960.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TI~iE CIRCULATION ENDED: TI~ LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 22-NOV-96 8B0-$38 2100 21-NOV-96 1100 22-NOV-96 10348.0 10348.0 8960.0 10332.0 1800.0 TOOL NUMBER ........... AMS- A SLS - WA HILTB -DTB 9.875 4069.0 4069.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 13 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) .. MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : Salt Water Based 9.80 52.0 9.0 1. 830 87.0 1. 670 78.0 1. 890 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform Express: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (Ri&O) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO"). Deviation is 27.30 DEC at start depth, and 85 DEC at TD. This is the raw PEX/BHC/AIT data at 0.1667' sample rate. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 O. 166 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 14 TYPE REPR CODE VALUE .............................. 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553794 O0 000 O0 0 4 1 1 4 68 0000000000 RHOZ PEX G/C3 553794 O0 000 O0 0 4 1 1 4 68 0000000000 HDRA PEX G/C3 553794 O0 000 O0 0 4 1 1 4 68 0000000000 PEFZ PEX 553794 O0 000 O0 0 4 1 1 4 68 0000000000 DPHZ PEX PU 553794 O0 000 O0 0 4 1 1 4 68 0000000000 H~IN PEX Otff4M553794 O0 000 O0 0 4 1 1 4 68 0000000000 H~INO PEX OH~M553794 O0 000 O0 0 4 1 1 4 68 0000000000 RXOZ PEX OH~M553794 O0 000 O0 0 4 1 1 4 68 0000000000 HGR AIT GAPI 553794 O0 000 O0 0 4 1 1 4 68 0000000000 HCNT PEX CPS 553794 O0 000 O0 0 4 1 1 4 68 0000000000 HCFT PEX CPS 553794 O0 000 O0 0 4 1 1 4 68 0000000000 HTNP PEX PU 553794 O0 000 O0 0 4 1 1 4 68 0000000000 HNPO PEX PU 553794 O0 000 O0 0 4 1 1 4 68 0000000000 TT1 BHC US 553794 O0 000 O0 0 4 1 1 4 68 0000000000 TT2 BHC US 553794 O0 000 O0 0 4 1 1 4 68 0000000000 TT3 BHC US 553794 O0 000 O0 0 4 1 1 4 68 0000000000 TT4 BHC US 553794 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10344.000 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX DPHZ.PEX 60721.211 H~IN. PEX 1.972 Iff~VO. PEX 3.097 RXOZ.PEX HGR.AIT 70.755 HCNT. PEX 2773.585 HCFT. PEX 1313.567 HTNP. PEX PZNPO.PEX 20.049 TT1.BHC 638.000 TT2.BHC 442.800 TT3.BHC TT4.BHC 421.600 DEPT. 8960.334 RHOZ.PEX 2.401 HiDRA.PEX 0.067 PEFZ.PEX DPHZ.PEX 15.065 H~IN. PEX 0.515 HMNO. PEX 0.453 RXOZ.PEX HGR.AIT 186.119 HCNT. PEX 1798.948 HCFT. PEX 622.113 HTNP. PEX HNPO.PEX 29.961 TT1.BHC 588.800 TT2.BHC 432.000 TT3.BHC TT4.BHC 410.000 -999.250 11.291 20.315 621.200 4.242 4.041 32.346 578.800 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 15 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE ' 97/02/24 ~REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREFIENT: 0.0833 FILE SUNff4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10344.0 8960.0 PEX LOG HEADER DATA DATE LOGGED: 22 -NOV- 96 SOFTWARE VERSION: 8BO -538 TIME CIRCULATION ENDED: 2100 21-NOV-96 TIME LOGGER ON BOTTOM: 1100 22-NOV-96 TD DRILLER (FT) : 10348.0 TD LOGGER (FT) : 10348.0 TOP LOG INTERVAL (FT) : 8960.0 BOTTOM LOG INTERVAL (FT) : 10332.0 LOGGING SPEED (FPHR) : 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC TOOL NUMBER ........... AMS-A SLS- WA LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 16 PEX PLATFORM EXPRESS BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) .. BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~ff4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : HILTB-DTB 9.875 4069.0 4069.0 Salt Water Based 9.80 52.0 9.0 1. 830 87.0 1. 670 78.0 1. 890 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) .. MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform Express: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (Ri40) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO"). Deviation is 27.30 DEG at start depth, and 85 DEG at TD. This is the raw PEX HCAL data at O. 0833' sample rate. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 17 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 553794 O0 000 O0 0 5 1 1 4 68 0000000000 HCAL PEX IN 553794 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10344.000 HCAL.PEX 9.178 DEPT. 8960. 084 HCAL. PEX 9. 640 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE ' FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 18 **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ArUMBER 6 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH AIT 10338.0 PEX 10338.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIldE CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): STOP DEPTH 9895.0 9895.0 22-NOV-96 8B0-538 2100 21-NOV-96 1100 22-NOV-96 10348.0 10348.0 8960.0 10332.0 1800.0 TOOL NUMBER ........... AMS - A SLS - WA HILTB -DTB 9.875 4069.0 4069.0 Salt Water Based 9.80 ~ 24-FEB-1997 08:53 PAGE: 19 LIS Tape Verification Listing Schlumberger Alaska Computing Center MUD VISCOSITY (S) : 52.0 MUD PH: 9.0 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): 1. 830 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): 1. 670 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1.890 MUD CAKE AT (BHT) : 87.0 78.0 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform Express: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (RXO) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO") Deviation is 27.30 DEG at start depth and 85 DEG at TD. This is the raw repeat AIT/PEX data @ 0.5' sample rate. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 553794 O0 000 O0 0 6 1 1 4 68 0000000000 GR AIT GAPI 553794 O0 000 O0 0 6 1 1 4 68 0000000000 TENS AIT LB 553794 O0 000 O0 0 6 1 1 4 68 0000000000 HTEN AIT LB 553794 O0 000 O0 0 6 1 1 4 68 0000000000 ~ES AIT 0Hi~4553794 O0 000 O0 0 6 1 1 4 68 0000000000 MTEMAIT DEGF 553794 O0 000 O0 0 6 1 1 4 68 0000000000 GDEVAIT DEG 553794 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PEX CPS 553794 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PEX CPS 553794 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PEX CPS 553794 O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PEX CPS 553794 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PEX 553794 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PEX 553794 O0 000 O0 0 6 1 1 4 68 0000000000 TNPH PEX PU 553794 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PEX PU 553794 O0 000 O0 0 6 1 1 4 68 0000000000 NPOR PEX PU 553794 O0 000 O0 0 6 1 1 4 68 0000000000 DT BHC US~F553794 O0 000 O0 0 6 1 1 4 68 0000000000 2O ** DATA ** DEPT. 10338.000 GR.AIT 112.029 TENS.AIT 1622.000 HTEN. AIT MRES.AIT 0.714 MTE~.AIT 166.777 GDEV. AIT -999.250 CNTC. PEX CFTC.PEX 877.361 RCFT. PEX 805.207 RCNT. PEX 2619.919 TNRA.PEX RTi~R.PEX 3.296 TNPH. PEX 35.167 NPHI.PEX 41.357 NPOR.PEX DT.BHC 99.500 DEPT. 9895. 000 GR.AIT 101 . 125 TENS.AIT 1086. 000 HTEN. AIT ~i~ES.AIT O. 761 MTEM. AIT 163. 757 GDEV. AIT 62.224 CNTC. PEX CFTC.PEX 1242.630 RCFT. PEX 1346.628 RCNT. PEX 3201.932 TNRA.PEX RTNR. PEX 2.324 TNPH. PEX 29. 718 NPHI. PEX 25. 720 NPOR. PEX DT. BHC 71. 900 286.482 2706.879 3.115 34.784 939.934 2838.803 2.591 29.150 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center * * * * FILE TRAILER * * ** FILE NAME : EDIT .006 SERVICE : FLIC VERSION . O01CO1 DATE : 97/02/24 MA~ REC SIZE : 1024 FILE TYPE : LO LAST FILE : 24-FEB-1997 08:53 PAGE: 21 **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 7 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREmENT: 0.25 FILE SOWMARY VENDOR TOOL CODE START DEPTH AIT 10338.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 9895.0 TOOL STRING (TOP TO BOTTOM) VE29~OR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS 22-NOV-96 8B0-538 2100 21-NOV-96 1100 22-NOV-96 10348.0 10348.0 8960.0 10332.0 1800.0 TOOL NUMBER ........... AMS- A SLS- WA HILTB-DTB LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): ~ FILTRATE AT (BHT): MUD CAKE AT (MT): MUD CAKE AT (BHT) : 9.875 4069.0 4069.0 Salt Water Based 9.8O 52.0 9.0 1. 830 87.0 1. 670 78.0 1. 890 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform Express: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (RXO) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO") Deviation is 27.30 DEG at start depth and 85 DEG at TD. This is the raw repeat AIT data @ 0.25' sample rate. $ LIS FORMAT DATA PAGE: 22 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 TYPE REPR CODE VALUE 3 73 48 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553794 O0 000 O0 0 7 1 1 4 68 0000000000 ATiO AIT OH~ff4553794 O0 000 O0 0 7 1 1 4 68 0000000000 AT20 AIT 0H~4553794 O0 000 O0 0 7 1 1 4 68 0000000000 AT30 AIT 0tflv~I553794 O0 000 O0 0 7 1 1 4 68 0000000000 AT60 AIT OHMM553794 O0 000 O0 0 7 1 1 4 68 0000000000 ATgO AIT OHMM553794 O0 000 O0 0 7 1 1 4 68 0000000000 AFIO AIT OHMM553794 O0 000 O0 0 7 1 1 4 68 0000000000 AF20 AIT 0P~4~553794 O0 000 O0 0 7 1 1 4 68 0000000000 AF30 AIT 0H~4553794 O0 000 O0 0 7 1 1 4 68 0000000000 AF60 AIT OHMM553794 O0 000 O0 0 7 1 1 4 68 0000000000 AF90 AIT 0Pff4~553794 O0 000 O0 0 7 1 1 4 68 0000000000 AIBD AIT IN 553794 O0 000 O0 0 7 1 1 4 68 0000000000 PAGE: 23 ** DATA ** DEPT. 10338. 000 ATiO.AIT 9.275 AT20.AIT 27. 462 AT30.AIT AT60.AIT 34.522 AT90.AIT 31.588 AFiO.AIT 9.273 AF20.AIT AF30 .AIT 31 . 418 AF60 .AIT 34. 078 AF90 .AIT 31 . 598 AIBD. AIT DEPT. 9895.250 ATiO.AIT 17.224 AT20.AIT 20. 782 AT30.AIT AT60.AIT 40. 945 AT90.AIT 39. 548 AFiO.AIT 19. 655 AF20.AIT AF30.AIT 26. 096 AF60.AIT 36. 052 AF90.AIT 36. 288 AIBD.AIT 29. 046 27. 585 4. 034 26.784 21.118 10.922 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 24-FEB-1997 08:53 PAGE: 24 **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER 8 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: i TOOL STRING NTJMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.1667 FILE SU~IARY VENDOR TOOL CODE START DEPTH ........................... AIT 10338.0 PEX 10338.0 BHC 10338.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 9895.0 9895.0 9895.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC 22-NOV-96 8B0-538 2100 21-NOV-96 1100 22-NOV-96 10348.0 10348.0 8960.0 10332.0 1800.O TOOL lV--UY4BER ........... AMS - A SLS- WA LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PEX PLATFORM EXPRESS BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) ~ RESISTIVITY (OHIO,) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): HILTB-DTB 9.875 4069.0 4069.0 Salt Water Based 9.80 52.0 9.0 1. 830 87.0 1. 670 78.0 1. 890 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL).. MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform Express: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (RXO) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO") Deviation is 27.30 DEG at start depth and 85 DEG at TD. This is the raw repeat AIT/PEX/BHC data @ 0.1667' sample ra re. $ LIS FORMAT DATA PAGE: 25 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 4 66 1 $ 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553794 O0 000 O0 0 8 1 1 4 68 0000000000 RHOZ PEX G/C3 553794 O0 000 O0 0 8 1 1 4 68 0000000000 PiDRA PEX G/C3 553794 O0 000 O0 0 8 1 1 4 68 0000000000 PEFZ PEX 553794 O0 000 O0 0 8 1 1 4 68 0000000000 DPHZ PEX PU 553794 O0 000 O0 0 8 1 1 4 68 0000000000 RXOZ PEX OHFlM553794 O0 000 O0 0 8 1 1 4 68 0000000000 HMIN PEX OHNIM553794 O0 000 O0 0 8 1 1 4 68 0000000000 H~NO PEX 0H~4553794 O0 000 O0 0 8 1 1 4 68 0000000000 HGR AIT GAPI 553794 O0 000 O0 0 8 1 1 4 68 0000000000 HCNT PEX CPS 553794 O0 000 O0 0 8 1 1 4 68 0000000000 HCFT PEX CPS 553794 O0 000 O0 0 8 1 1 4 68 0000000000 RHFT PEX CPS 553794 O0 000 O0 0 8 1 1 4 68 0000000000 RHNT PEX CPS 553794 O0 000 O0 0 8 1 1 4 68 0000000000 HTNP PEX PU 553794 O0 000 O0 0 8 1 1 4 68 0000000000 HNPO PEX PU 553794 O0 000 O0 0 8 1 1 4 68 0000000000 TT1 BHC US 553794 O0 000 O0 0 8 1 1 4 68 0000000000 TT2 BHC US 553794 O0 000 O0 0 8 1 1 4 68 0000000000 TT3 BHC US 553794 O0 000 O0 0 8 1 1 4 68 0000000000 TT4 BHC US 553794 O0 000 O0 0 8 1 1 4 68 0000000000 26 ** DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center DEPT. 10338.000 RHOZ.PEX DPHZ.PEX 60721.211 RXOZ.PEX HGR. AIT 112. 029 HCNT. PEX RHNT. PEX 2619.919 HTNP.PEX TT2.BHC 437. 600 TT3 .BHC DEPT. 9895.334 RHOZ.PEX DPHZ.PEX 0.307 RXOZ.PEX HGR.AIT 96.482 HCNT. PEX RHNT. PEX 3043.145 HTNP.PEX TT2.BHC 353.600 TT3.BHC 24-FEB-1997 08:53 -999.250 HDRA.PEX 2.100 HMIN. PEX 2706.879 HCFT. PEX 35.167 HNPO.PEX 625.600 TT4.BHC 2.645 HDRA.PEX 7.585 HMIN. PEX 3034.516 HCFT. PEX 29.847 HNPO. PEX 492.000 TT4.BHC -999.250 PEFZ.PEX 1.756 H~NO. PEX 877.361 RHFT. PEX 34.784 TT1.BHC 424.400 O. O17 PEFZ. PEX 1. 035 H~VO . PEX 1247. 762 RHFT. PEX 29. 022 TT1. BHC 344. 000 PAGE: 27 -999.250 1.730 805.207 634.400 3.481 0.708 1238.003 499.600 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER 9 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRINGIER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.0833 FILE SUMMARY VENDOR TOOL CODE START DEPTH ........................... PEX 10338.0 $ LOG HEADER DATA STOP DEPTH .......... 9895.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : 22-NOV-96 8B0-538 2100 21-NOV-96 1100 22-NOV-96 10348.0 10348.0 8960.0 10332.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS $ TOOL NUMBER AMS - A SLS - WA HILTB-DTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 9.875 4069.0 4069.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATTrRE (DEGF): RESISTIVITY (Otff~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : Salt Water Based 9.80 52.0 9.0 1. 830 87.0 1. 670 78.0 1. 890 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.5 REMARKS: Platform E~rpress: Array Induction, Triple Detector Litho-Density, Compensated Neutron, Gamma Ray, and Micro-cylindrical Focussed Resistivity (RXO) Platform Express and BHC Sonic run in combination Tools conveyed by drillpipe (TLC) Four 1.5" standoffs used on BHC, Two 1.5" standoffs used on AIT. Two tool turners used to orient Density pad. Depth correlated to photocopy of Gr Anadrill log. Saline mud may affect shallow induction curve (esp.lO") PAGE: 28 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 Deviation is 27.30 DEG at start depth and 85 DEG at TD. This is the raw repeat PEX HCAL data @ 0.0833' sample rate. $ LIS FORMAT DATA PAGE: 29 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 66 66 73 66 66 73 65 0.083 FT 128 1 2 3 4 5 6 7 8 68 9 65 11 66 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553794 O0 000 O0 0 9 1 1 4 68 0000000000 HCAL PEX IN 553794 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 10338. 000 HCAL. PEX 4. 034 DEPT. 9895.084 HCAL.PEX 10.196 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-FEB-1997 08:53 PAGE: 30 **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/24 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/02/24 ORIGIN . FLIC TAPE NAME : 96374 CONTINUATION # : 1 PREVIOUS TAPE : CO~IENT : ARCO ALASKA INC, DS 4-49, PRUDHOE BAY, API #50-029-22713-00 **** REEL TRAILER **** SERVICE NA~E : EDIT DATE : 97/02/24 ORIGIN : FLIC REEL NAM~ : 96374 CONTINUATION # : PREVIOUS REEL : COGENT : ARCO ALASKA INC, DS 4-49, PRUDHOE BAY, API #50-029-22713-00