Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout216-002WELL LOG TRANSMITTAL #905206793
To: Alaska Oil and Gas Conservation Comm. March 12, 2019
Attn.: Natural Resource Technician
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Production Profile: L5 -12A
Run Date: 10/12/2018
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
L5 -12A
Digital Data (LAS), Digital Log file 1 CD Rom
50-029-21694-01 RECEIVES
MAR 14 2019
A®GCC
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Halliburton
Wireline & Perforating
Attn: Fanny Sari
6900 Arctic Blvd.
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ANC@halliburton.com and GANCPDC@USAANC.hou.
Date: Signed:
2 160 02
30 44 7
RECEIVED 21 6002
28724
Originated:
OCT 2 0 2017
Delivered to: .
20Oct-17
Schlumber er
9
DESCRIPTIONDATA
Thrubit Rev2
�'MakanaK Bender
20Oct17JW0
PTS-PRINTCENTER
AOGCC
Natural Rescurces,rechmcian 11
50-029-21694-01
6411 A Street
LISBURNE
Alaska Oil & Gas Conservation Comnussioc
DATA LOGGED
to Z-ti201-1
Anchorage, AK 99518
11 -Jul -17
• -, ..
1
(907)273-1700 main
(907)273-4760 fax-��
-00007
M. K. BENDER
NAME
F -35A
API #
50-029-21843-01
ORDERSERVICE
DODJ-00046
FIELD NAME
PRUDHOE BAY
SERVICE
DESCRIPTIONWELL DELIVERABLE
WL
DESCRIPTIONDATA
Thrubit Rev2
DATELOGGED
FINAL FIELD
11 -May -17
• ••
PRINTS
1
CDs
1
LS -12A
50-029-21694-01
-00012
LISBURNE
Memory
PPROF
FINAL FIELD
11 -Jul -17
1
1
GNI-02A
50.029-22851-01
-00007
PRUDHOE BAY
WL
(PROF
FINAL FIELD
17 -Jul -17
1
1
OWDW-SE
OWDW-NW
OWDW-c
50-029-21818-00
50.029-21819-00
50-029-21821-00
-00069
-00025
-00026
!D�D
PRUDHOE BAY
PRUDHOE BAY
PRUDHOE BAY
WL
WL
WL
RST
RST
RST
FINAL FIELD
FINAL FIELD
FINAL FIELD
2 -Aug -17
3 -Aug -17
4 -Aug -17
1
1
1
1
1
1
09-19
11-18
50-029-20260-00
50-029-21021-01
50-029-21607-00
-00013
DQM-00014
DTBP-00039
PRUDHOE BAY
PRUDHOE BAY
PRUDHOE BAY
Memory
Memory
WL
SCMT
SCMT
LDL
FINAL FIELD
FINAL FIELD
FINAL FIELD
6 -Aug -17
15 -Aug -17
5 -Sep -17
103-25A
1
1
1
1
Transmittal Receipt
A Transmittal Receipt signature confirms that a package (box,
�� envelope, etc.) has been received and the contents of the
xdij
Z4V
,, ��
.X.�scrJv_ package have been verified to match the media noted above. "
Print Name Signature
Date specific content of the CDs and/or hardcopy prints may or may
Please send signed transmittal to BP via email or post.
not have been verified for correctness or quality level at this
��n C�dC u om
point.
BP PDC 1-112-1, 900 E Benson Blvd, Anchorage, AK 99508
1c, o
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon ❑ Plug Perforations 0 Fracture Stimulate ❑
Pull Tubing ❑ Operations shutdown
❑
Suspend ❑ Perforate ❑ Other Stimulate 0
Alter Casing ❑ Change Approved Program
❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑
Re-enter Susp Well ❑ Other: 4 C/ q/ 5 -t-i m
I�
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development 0
Stratigraphic ❑
Exploratory ❑
Service ❑
15. Permit to Drill Number: 216-002
3. Address: P.O. Box 196612 Anchorage,
AK 99519-0612
1 6. API Number: 50-029.21694-01-00
7. Property Designation (Lease Number): ADL 0028338
8.
Well Name and Number: PBU L5.12A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10.
Field/Pools:
PRUDHOE BAY, LISBURNE OIL
11. Present Well Condition Summary:
19ECEIV
Total Depth: measured 13914 feet Plugs
true vertical 8762 feet Junk
measured feet DEC 15 2016
measured feet
Effective Depth: measured 13759 feet Packer
measured 10690 feet flO�^/1
true vertical 8781 feet Packer
true vertical 8549.14 feet A"1 vv
Casing: Length: Size: MD:
TVD: Burst: Collapse:
Structural
Conductor 79 20" 48 - 127
48-127 1490 470
Surface 4167 13-3/8" 47-4214
47-4007 3700/4930 4930/2670
Intermediate 8895 9-5m.. 45-8940
45-7221 6870 4760
Liner 2194 7" 8752-10946
7074-8740 7240 5410
Liner 3015 4-1/2" 10777 - 13792
8614-8778 9020 8540
Perforation Depth: Measured depth: 11182 - 13814 feet
True vertical depth: 8894.57 - 8762. feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85
43-10784 43-8619
Packers and SSSV (type, measured and See Attachment
See Attachment See Attachment
true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
See Attachment.
Treatment descriptions including volumes used and final pressure:
See Attachment.
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
New Well
Subsequent to operation:
2581
7546
1422
1180
993
14. Attachments: (wiuiree per 20 AAC M.070.25.071, a 25.21
15. Well Class after work:
Daily Report of Well Operations 0
Exploratory ❑ Development
0 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ 1
GSTOR ❑ WINJ ❑
WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
NIA
Contact Catron, Garry R Were) Email
Garry.Catron@bp.com
Printed Name Catron, Garry R (Wipro) Title
PDC Principal Engineer
Signature AfaiPhone
+1 907 564 4424 Date 12/15/16
Fenn 10-400 Revised 512015 ,y 9 v �� Z 6� / f RBDMSU 2016
� DEC 2 G g L (O�1c
1p Submd Original Only
PBU L5 -12A
October 2016 Acid Stimulation & Cement Squeeze
Sundry Well Operations Report Attachment
12. Present well condition summary
Intervals Treated (measured)
10/25/16 (Acid Stimulation): 13725'— 13914'
10/26/16 (Acid Stimulation): 12766'— 13636'
10/27/16 (Acid Stimulation): 11182'— 12727'
10/28/16 (Cement Squeeze): 10946' 11140'
Treatment descriptions including volumes used and final pressure:
10/25/16 (Acid Stimulation):
14.5 Bbls 3% Slick KCL, 19.3 Bbls MaxCO3 Diverter, 29.7 Bbls 15% VDA Acid, 116.4 Bbls 3% Slick
KCL w/SafeLube, 114.1 Bbls 3% Slick KCL w/Musol, 80 Bbls Diesel, 348 psi.
10/26/16 (Acid Stimulation):
76.4 Bbls 15% VDA Acid, 207.4 Bbls 3% Slick KCL w/ F103, 126.9 Bbls 3% Slick KCL w/Musol,
161.6 Bbls 3% Slick KCL w/SafeLube, 276.1 Bbls 3% Slick KCL w/SafeLube & F103,224.4 Bbls 3%
Slick KCL w/SafeLube & F103 & Musol, 65 Bbls Diesel, 155.5 Bbls MaxCO3 Diverter, 348 psi.
10/27/16 (Acid Stimulation):
120.3 Bbls 15% VDA Acid, 149 Bbls 3% Slick KCL, 155.9 Bbls 3% Slick KCL w/ F103, 386.6 Bbls 3%
Slick KCL w/F103 & Musol, 26.6 Bbls 3% Slick KCL w/Musol, 337.5 Bbls 3% Slick KCL w/SafeLube,
408 Bbls 3% Slick KCL w/SafeLube & F103, 65 Bbls Diesel, 222.7 Bbls MaxCO3 Diverter, 297 psi.
10/28/16 (Cement Squeeze):
6 Bbls 15.8 ppg Class G Cement, 11 Bbls Fresh Water, 10 Bbls PowerVis, 871 Bbls 3% Slick KCL, 94
Bbls 60/40 Methanol/Water, 739 psi.
Daily Report of Well Operations
PBU L5 -12A
ACTIVITYDATE
SUMMARY
9/1/2016
***WELL S/I ON ARRIVAL***(sidetrack)
T/I/O = TWC/0/0. PT'd tree through lubricator. (PASSED). Pulled 4" CIW TWC #434 @ 125".
9/1/2016
RDMO. SEE LOG FOR DETAILS. ***JOB COMPLETE***
****WELL S/I ON ARRIVAL****
SET 4-12" SLIP STOP @ 4324' SLM.
PULLED RKP-DCR FROM STA#4 @ 4,182' SLM/4,214' MD
SET RK-DGLV IN STA#4 @ 4,182' SLM/4,214' MD
PERFORMED PASSING MIT -IA TO 2,674 psi
PULLED B&R FROM 4-1/2" RHC @ 10,766' MD.
PULLED 4-1/2" RHC FROM X -NIP @ 10,766' MD
9/6/2016
***WELL S/I ON DEPARTURE***(pad op notified= job complete, well & well head status).
T/I/O = 320/Vac/Vac.Temp = SI. WHP's. (Pre -Klondike). No AL.
9/28/2016
SV, WV, SSV = C. MV = O. IA, OA = OTG. 20:40
T/I/0= 300/0/0. Shift Hydraulic Frac Port (Post rig). Pressured up the IA to 2700 psi. with 5.7 bbls of
diesel. Pressured up on the TBG with diesel. Sharp pressure drop from 4987 psi to 1700 psi after
pumping 8 bbls. Increase rate to 5 bpm at 1850 psi. Increase the rate to 6 bpm at 2000 psi. Increase
the rate to 7.5 bpm at 2300 psi. Pumped a total of 50 bbls of diesel into the TBG. Bled back 5 bbls
from the IA to 20 psi. FWHP= 0/20/0. WV, SV and SSV closed. MV open. IA/OA OTG. DSO notified
10/15/2016
of well status upon departure.
LRS 46 heat DSL transport to 90* F and RU/PT on PRV skid for Frac in AM.
10/24/2016
*** Job continued on 10-25-16 ***
CTU#9 2.0" CT Job Objective: Acid Frac
MIRU CTU.
10/24/2016
***In Progress***
SLB Frac: Job Scope: Multi Stage Acid Stimulation w/ Coiled Tubing and Frac: Finish rigging up SLB
Frac. Prime up and pressure test lines. Pump stimulation Stage 1 through Fracport # 1 per
schedule: Pumped 80 bbls of 20% ETCH acid down CT at 4.5 bpm while pumping various stages of
3% KCL + Surfactant, 3% KCL + Musol, 15% VDA acid, and 100 ppt MaxCO3 diversion down the
coil tubing x tubing annulus at 5 bpm using frac pumps. Observed treating pressure decrease when
acid was on formation, did not see significant diversion with MaxCO3 on formation. Pull NCS coil
10/25/2016
tubing BHA to download gauge data. ***Job Continued on 10/26/2016***
Daily Report of Well Operations
PBU L5-12A
CTU#9 2.0" CT Job Objective: Acid Frac
Perform weekly BOP Test. PT treating line per program. MU NCS tools with recorder subs and ball
drop nozzle. RIH and bullhead 150 bbis of 3% KCI with safelube. Tag PBTD and correct depth. PUH
to 13745'. Frac pumped stage #1. POH and notice gouges on pipe. Stop pipe and fix. Adjust goose
neck bullhead another 155 bbls of 3% KCL w / safelube & 35 bblls of 60/40 down BS for freeze
protect POOH
10/25/2016
***In Progress***
**** Job continued from 10-24-16 **** Assist frac by holding IA backside pressure. Pumped 3.37 bbis
of diesel down IA to reach 2000 psi. Maintain 2000-2400 psi on IA while fraccing.
10/25/2016
*** Job continued on 10-26-16 ***
SLB Frac: Job Scope: Multi Stage Acid Stimulation w/ Coiled Tubing and Frac: Acid stimulate
stages 2, 3, 4, and 5 at varying rate and volumes as follows:
3% KCL w/ Surfactant, 3% KCL w/ Musol, 15% ETCH, 20% VDA, MaxCO3 diversion at 150 ppt,
20% VDA, 3% KCL w/ surfactant, and 3% KCL w/ Musol
Stage 2, 3, and 4: Observe treating pressure decrease with ETCH acid on formation, observe good
indication of diversion with MaxCO3 on formation
Stage 5: Observe treating pressure decrease with ETCH acid on formation, observe very good
indication of diversion with MaxCO3 on formation
10/26/2016
Flush and vac out lines. ***Job Continued on 10/27/2016***
CTU#9 2.0" CT Job Objective: Acid Frac
*** Continue WSR from 10/25/16***
RI w / NCS coil Frac tools. Set packer at 500' and pressure tested it to 500 psi. Locate sleeve #13
and correct depth. Run to bottom and shift open sleeve #2. Pump frac stage. PUH and shift open
sleeve #3. Pump frac stage. PUH and shift open sleeve #4. Pump frac stage. PUH and shift open
sleeve #5. Pump frac stage. Frac done for the day. Locate sleeve #6 and paint yellow flag. POH and
check tools. At surface change tools RBIH w / NCS frac tools
***In Progress***
10/26/2016
*** Job continued from 10-25-16 *** Assist frac by holding IAP between 2000 - 2400 psi/bleeding as
needed. Pumped 4.6 bbis diesel down IA to reach pressure of 2000 psi. *** Job continued on 10-27-
10/26/2016
16 ***
Daily Report of Well Operations
PBU L5-12A
SLB Frac: Job Scope: Multi Stage Acid Stimulation w/ Coiled Tubing and Frac: Acid stimulate
stages 6, 7, 8, 9, 10, and 11 at varying rate and volumes as follows:
3% KCL w/ Surfactant, 3% KCL w/ Musol, 15% ETCH, 20% VDA, MaxCO3 diversion at 150 ppt,
20% VDA, 3% KCL w/ surfactant, and 3% KCL w/ Musol
Stage 6, 7, 8: Observe treating pressure decrease with ETCH acid on formation, observe good
indication of diversion with MaxCO3 on formation
Stage 9, 10, and 11 : Observe slight treating pressure decrease with ETCH acid on formation,
observe slight indication of diversion with MaxCO3 on formation
Retreat Station 7 with remaining ETCH acid.
10/27/2016
Flush and vac out lines. Rig down ***Job Complete***
CTU#9 2.0" CT Job Objective: Acid Frac
*** Continue WSR from 10/26/16***
RIH w / NCS frac tools max OD 3.78" . On bottom located sleeve and correct + 19, set packer and
pressure tested packer to 500 psi release packer and wait for frac crew. Locate and set packer in
sleeve #6. Pump treatment in sleeve 6,7,8,9. See Frac AWGRS for details.
10/27/2016
***Job in Progress***
*** Job continued from 10-26-16 *** Assist with frac. Maintain IAP of 2000 - 2400 psi. Bleeding as
needed. Pumped 5.7 bbls diesel down IA to reach 2000 psi. Maintained 2200 - 2400 psi with an
additional . 6.5 bbls of diesel total. Bled IA pressure down to 0 psi PER Frac lead.
RDMO T/IA/OA 150/0/Coil-TBG
10/27/2016
SV,WV,SSV,MV,IA,OA = FRAC
CTU#9 2.0" CT Job Objective: Acid Frac
*** Continue WSR from 10/27/16***
Rig up cement lines. Perform injectivity test @ 1 bpm 167 psi @ 2 bpm 343 psi open sleeve #12
pump 11 bbls of 15.8 ppg cement behind pump close sleeve and pressure test sleeve to 862 psi to
confirm sleeve is closed. FP well with 31 bbls of 60/40 meth. Shift open sleeve # 8, 9, 10, and
11. The following sleeves are open 1 - 11. Closed = 12 (cemented) and 13. POOH to surface. LD
BHA. RDMO to 03-24.
10/28/2016
**** Job Complete ****
Fluids Summary
Bbls
Type
137
Diesel
224
60/40 Methanol / Water
1035
3% Slick KCL
398
MaxCO3 Diverter
226
15% VDA Acid
616
3% Slick KCL w/SafeLube
268
3% Slick KCL w/Musol
363
3% Slick KCL w/F103
684
3% Slick KCL w/SafeLube & F103
224
3% Slick KCL w/SafeLube & F103 & Musol
387
3% Slick KCL w/F103 & Musol
6
15.8 ppg Class G Cement
11
Fresh Water
10
PowerVis
Packers and SSV's Attachment
PBU L5 -12A
SW Name
Type
MD
TVD
Depscription
15-12A
PACKER
8763.27
7082.7
7" Weatherford TSP Packer
1-5-12A
TBG PACKER
10690.39
8549.14
4-1/2" HES TNT Perm Packer
1-5-12A
PACKER
10787.91
8622.03
5' Weatherford Liner Top Packer
1-5-12A
PACKER
11140.46
8872.52
4-1/2" Swell Packer
1-5-12A
PACKER
11470
8969.17
4-1/2" Swell Packer
1-5-12A
PACKER
11824.51
8933.64
4-1/2" Swell Packer
1-5-12A
PACKER
11985.23
8905.42
4-1/2" Swell Packer
1-5-12A
PACKER
12232.74
8853.16
4-1/2" Swell Packer
1-5-12A
PACKER
12459.76
8805.76
4-1/2" Swell Packer
1-5-12A
PACKER
12727.45
8772.76
4-1/2" Swell Packer
L5 -12A
PACKER
12886.94
8772.47
4-1/2" Swell Packer
1-5-12A
PACKER
13134.3
8788.56
4-1/2" Swell Packer
1-5-12A
PACKER
13397.46
8800.33
4-1/2" Swell Packer
L5 -12A
PACKER
13685.74
8786.53
4-1/2" Swell Packer
TREE=
4-1/8" CAN
TOP DG'TH
1
-VALLFEAD =
13-5/8' FMC GEN N
4-1/2'
11140'
ACTUATOR=
10
4-12'
11470'
OKB. ELEV =
60'
4-12"
11825'
REF ELEV =
67.35'
4-1/2'
11985'
BF. ELEV =
22.25'
4-1/2"
12233'
KOP=
2375'
20"GOND•"
^119'
Max Angle =
102° @ 12177'
91.5#, H-40,
12727'
Datum MD =
11469'
D -
12887'
IAtumTVD=
89W SS
4-1/2'
13134'
3.958'
2
4-12"
13-3/8" CSG, 72#, K-55 BTC/L-80 BTC, D = 12.347'
4206'
1
4-12'
13686'
3.920"
6
Minimum ID = 3.813" @ 2196'
NA
4-1/2"
OTIS X NIPPLE
10/28/16
5
9-5/8" VN-IPSTOCI( (08/07/16) 9744-
9-5/8* CSG, 47#, L-80 NSOCJBTC, D = 8.681' -8944'
ITOP OF 4-1/2" LNR
4-1/2" TBG, 12.6#, 13CR-85 VAM TOP,
.0152 bpf, D = 3.958"
7" LNR, 26#, L-80 VAM TOP HCJBTPM,
.0383 bpf, D = 6.276"
4-1/2'
HES SWELL PACKERS
NO
SIZE
TOP DG'TH
MN D
11
4-1/2'
11140'
3.958'
10
4-12'
11470'
3.956'
9
4-12"
11825'
3.958"
8
4-1/2'
11985'
3.958'
7
4-1/2"
12233'
3.958'
6
4-1/2"
12460'
3.958'
5
4-1/2"
12727'
3.958"
4
4-1/2"
12887'
3.958'
3
4-1/2'
13134'
3.958'
2
4-12"
13397'
3.958"
1
4-12'
13686'
3.920"
t-42" LNR 12.6#, 13CR-85 HYO521, I 13792'
.0152 bpf, D = 3.958"
L5 -12A
I,
SAFETY NOTES: WELL ANGLE> 70" @ 11264' • ' MAX
DOGLEG: 13.4• @ 11232'. CHROME TBG 8 LNR--4-12'
LNR HAS 13.5# PUP JTS w /D = 3.920'-
2196' 4-1/2' OTIS X NP, D= 3.613"
GAS LFT MWMOZaS
ST
MD
TVD
DEV
TYFE
VLV
LATCH PORT1=024149
10856'
4
4214
4007
46
MMU
DOME
RK 16
3
6905
5889
49
MMG
SO
RK 20
2
8681
7020
41
MTAG
OMY
RK 0
1
9465
7627
41
G&
DMY
BK 0
8762'1 9-5/8" X 7' WFT TSPSH 3 LTP, D = 6.19'
8768' 9-5/8" X 7" WFT WPHR HGP, In 6.18'
MLLOUT VVNDM (1-5-12A) 8949 - 8958'
10662' 4-12" HES X NP. D = 3.813-
X 4-112" HES TNT PKR D =
/2" HES X NP, D = 3.813'
7' X 5"
1T X 5- WFT HGR D = 4.27"
5' X 4-1/2" XO, D = 3.92'
NCS FRACPORT 9LVS In= 3.860 -
NO
DEPTH
SEAT SZ
ACTUAL SZ
OIC
DATE
13
10856'
NA
3.860"
C
0823/16
-12
11082'
NA
3.860'
C
0823/16
11
11413'
NA
3.860'
O
1028/16
10
11766'
NA
3.860'
0
1028/16
9
11927'
NA
3.860'
0
1028/16
8
12174'
NA
3.860'
0
1028116
7
12401'
NA
3.860'
0
10/28/16
6
12669'
NA
3.860"
0
10/28/16
5
12828'
NA
3.860'
0
1028/16
4
13076'
NA
3.860"
O
1028/16
3
13339'
N4
3.860"
O
1028116
2
13627'
NA
3.860'
0
1028116
'1
13735'
M
3.340"
O
1028116
U=OPEN C=CLOSED
'FRACPORT SLEEVE#1 = WFD RD TOE SLEEVE
-FRACPORT SLEEVE#12 = CEMENT®
DATE REV BY COMMENTS
DATE I REV BY COMuE41S
0320187 ORIGINAL COMPLETION
11/03/16 MYJJMD OPEN FRACPORTS/CMTSQZ
0825116 P-272 SIDETRNCK(L5-12A)
11/03/16 M(W/J GLV C/O (10/31116)
09108/16 N 7JJMD FNALODEAPPROVAL
09/08116 JNJJMD UPRATED OKB 8 REF 9 -EV
09/14/16 NSIJMD CORRECTED TOE SLV D
0920116 JPK/JMD GLV CYO (09/06116)
LISBURFE UNIT
WELL L5 -12A
PERMIT No: `2160020
API No: 50-029-21694-01
SEC 1, T11N R15F- 1668' FSL 8 15' FWL
DATA SUBMITTAL COMPLIANCE REPORT
12/15/2016
Permit to Drill 2160020 Well Name/No. PRUDHOE BAY UN LIS 1-5.12A Operator BP EXPLORATION (ALASKA) INC. API No. 50.029-21694-01-00
MD
13914
TVD 8762 Completion Date
8/25/2016 Completion Status 1 -OIL
Current Status 1 -OIL UIC No
REQUIRED
INFORMATION
Mud Log No
/
Samples No V
Directional Survey Yes
DATA
INFORMATION
Types
Electric or
Other Logs Run: MWD/GR/RES/NEU/DEN/Micro RES, Cement Evaluation
(data taken from
Logs Portion of Master Well Data Maint)
Well Log
Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval OH/
Type
Med/Frmt
Number
Name _
Scale Media No Start Stop CH
Received
Comments
ED
C
27525
Digital Data
8668 8982
9/2/2016
_ _
Electronic Data Set, Filename: L5 -
12A C1 18AUG2016 USIT-
MSIP_SCH_FPM_ConCuR02_L009Down.las,
ED
C
27525
Digital Data
8612 10953
9/2/2016
Electronic Data Set, Filename L5 -
12A C1 18AUG2016 USIT-
MSIP_SCH_MAIN_ConCu_R02_L005Up.las
ED
C
27525
Digital Data
8572 9343
9/2/2016
Electronic Data Set, Filename: L5 -
12A C1 18AUG2016 USIT-
MSIP_SCH_REPEAT_ConCu_R03_L003Up.las '
ED
C
27525
Digital Data
9/2/2016
Electronic File: L5 -12A C1 18AUG2016 USIT-
MSIP_SCH FPM _ConCuR02_L009Down.dlis '
ED
C
27525
Digital Data
9/2/2016
Electronic File: L5 -12A C1 18AUG2016 USIT-
MSIP_SCH_MAIN_ConCuR02_L005Up.dlis
ED
C
27525
Digital Data
9/2/2016
Electronic File: 1-5-12A C1 18AUG2016 USIT-
MSIP_SCH_REPEAT_ConCu_R03_L003Up.dlis
ED
C
27525
Digital Data
9/2/2016
Electronic File: L5 -12A C1 18AUG2016_USIT-
P
MSIP_ SCH_FIELDPRINT_V2.Pdf
Log
C
27525
Log Header Scans
0 0
2160020 PRUDHOE BAY UN LIS L5 -12A LOG
HEADERS
ED
C
27796
Digital Data
8922 13914
12/8/2016
Electronic Data Set, Filename: 1-5-
12A_BHI _LTK_MEM_Composite Drilling Depth
Data.las
ED
C
27796
Digital Data
10868 13914
12/8/2016
Electronic Data Set, Filename: 15-12A BHI—STK ,
IMAGE (6.125)_Composite_MEM_10947-
13914.1as
ED
C
27796
Digital Data
12/8/2016
Electronic File: L5-12A_BHI_LTK_2MD_Memory ,
Drilling Log.cgm
AOG('C
Page I of
"1hursday, December 15, 2016
r
E
E
E
U
_m y
EnnE
rn J
N 2
m
N
Y
E
z
0
m
a
o
0
0
£
O
n
o
n
N
>
(7
N
t0
N
J
N
J
U
y
y
O
N
O
Z
C
Q
U
N
C
❑I
m
w
❑
C❑
m
Z
I
Z
Z
In
O
J
❑
i0
❑
❑`
N
❑
10
❑
In
N
m
In
J
Z
YI
Z
Y
Z'
Y "-
J
m
m
m
m
vi
h
E
E
J_
E
Q
J
o
Z
I
I
.
o
_
N
_
I
I
I
Z
2
2
E
2
S
S J
S
S
I
I
=
d
In
m
N
m l
I�
C
m
I
N
m
N
m l
m
m
m
m
m>
Q
In
Q
M
Q W
U
Q
fn
Q
In
Q
WMa
Q
Q
Q
QNdtiN
OFJ_
gNd
N
❑
❑
INIvU
I
WQ❑am
J
J N
J
In NJ
trI
In
JJJJJJ
OyJ
E
a
Z-Q^yrnQJa
N
dLL
NF
4>
G
Ny
N
N
N
N
=
LLJ0UcN
LL m
LL
LLN
INL J
LL
J
ll
IL J
I
LL d
O
IL
llUv
K
_2I>❑NJ-
U O
U
U
U -y
U
of
U
75
WE
NQ
E
o
O
2
Q
2
o
2
o
2
Q
Em
2
o
g
r
Q
2
Q
o
02
W
iQ
Q
Q
p
�w
/L�L/
O
W
W
W
W
WO
WLL'
W
W
W
W
W-°
W
WLL
NS
OZ
°
Jt0
tp
t0
tD
�O
�D
t0
tD
IO
t0
t0
tD
�O
(O
In
LL.
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
QN
N
N
N
N
eco
N
N
N
N
N
N
N
N
N
N
W
w
N
aD
N
co
N
m
N
N
e
E.
N
W
N
CR
co
m
a
ao
a
ro
N
m
N
co
N
M
O
`^
Vn
I,c
W
W
J
aR
y
O
J
d
a
J
a�
°I
C r
O
o
c O
O N
In
�
E
U N
0
Q
U
J r
N
Q
N
J
N
L�L
o
Sr
j
N
L
Q
m
N
m
V/
O
U
O
Qa,
❑
c
°
a
Q
o
E
0
Z
d
o
UIt
m
c
R
2
U
In
N
m
N
l0
l0
N
N
R
l0
10
t0
@
N
N
N
N
'O
r
N
t0
N
10
N
10
N
10
t0
N
N
N
N
N
N
2 O
_rn
_rn
m
rn
m
o,
o,
a,
o,
o,
m
rn
m
_rn
_m
o
o
o
❑
o
0
0
❑
o
0
0
❑
o
❑
❑
E
c
❑❑
>
0
m
<o
In
0
m
0
m
'o
ro
0
m
0
In
In
In
o
~
rn
r
m
r
m
r
rn
r
m
r
rn
r
rn
r
rn
r
rn
r
rn
r
rn
r
rn
r
m
r
rn
r
rn
r
rn c
r
to
n
r
n
n
r
r
r
r
r
r
r
r
r
r
r N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N N
N
6
E
.c
v
N
❑
O
rn
N
N
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U G
E
V
d
❑
❑
❑
❑
❑
❑
❑
❑
O
❑
❑
❑
°
O
O
O
o m
a
i
lw
w
w
w.
w
w
w
w_
w
w
w
w
w
W
W
J ;
r
E
E
E
U
_m y
EnnE
rn J
N 2
m
N
Y
E
z
0
m
a
a
0 0
N N
N �
N
W N
Ci
O
RECEIVED 2 1 60 02
k6 0 8 2ul, PRINT DISTRIBUTION LIST 27 9 6
B4KER
HUGHES
AOCCC
COMPANY
BP Exploration Alaska Inc.
WELL NAME L5 -12A
FIELD Prudhoe Bay Unit
COUNTY North Slope Borough
BHI DISTRICT
Alaska
ase sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
rotechnical Data Center, L12-1 DATA LOGGED
E. Benson Blvd. I2./t3/2otfp
M K. BENDER
:horage, Alaska 99508
LOG TYPE GR-RES-DEN-NEU
STK:Image Log
LOG DATE August 20, 2016
AUTHORIZED BY Paul Canizares
EMAIL Paul. CanlzaresicDbakerhughes.COm TODAYS DATE December 5, 2016
Revision
STATUS Final Replacement: No Details:
Rev. Requested by: ---
COMPANY
ADDRESS IFEDEX WILL NOT DELIVER TO P.O. BO*
PERSON ATTENTION
4
t BP North Slope.
EOA, PBOC. PRB-20 (Office 109)
D&C Wells Project Aids Agatha Bulks & Ba rho to Glassmaker
11900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska I
I: Ricky Elgarico
) 3-344
G Street
horage, AK 99510
FIELDI
FINAL
D/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
I
SURVEY
REPORT
]
LOGS
CGM,Final Surveys)
(Compass)
J# OF PRINTS
# OF COPIES
# OF COPIES
# OF COPIES
V V V
10
3 Exxon Mobil, Alaska
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4;!Stme of Alaska
Attn: Makans B
333 W. 7th Ave,
Anchorage, Alas
5 DNR - Division of Oil & Gas ***
Attn: James By on
550 West 7th Avenue, Suite 802
Anchorage, Alaska 99501
** Stamp "confidential' on all material deliver to DNR
0 1 1 1 1 1 1 10
611 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
1900 E. Benson Blvd.
Anchorage, Alaska 99508
0 0 0 0 0
TOTALS FOR THIS PAGE: 0 3 5 4 0
TOTALS FOR ALL PAGES: 0 3 5 4 0
N to
Q
O al
lD
h
e—
N CN
Rl
a
CQ,
C�
amp
Rl
a
m
Y
Q
�
J
Q
C
Q
cv
�
V
�
it
N
a
A
J d Lo O
N
J
w�
N
N
7
O 7 0 N N
r r
y
Q
Z J_1JJ
o
LL
N
■Ljo §
CE
HMO
�■
�
\f
(( !\
\\\ )
\\{
-
,
{k.
))§2\k
!
)
CE
�
\k}
-
,
\
/
;
\
.
0
! !!00
■ « !
\ /
)
CE
�
\k}
)
CE
)
O
O
O
N
N
N
N
N
N
m
M
M
P
b
O
O
O
O
O
O
O
O
O
O
O
C
O
C
G
p
o
m
�Wci
uu
c'
w
ab
m
N N
w
a
O
P
n
m
M
O
N
O
O
N
O
O
N
O
O
g
z
OO
N
C
O
O
O
O
O
O
O
O
O
C
O
O
OO
C
OO
OO
O
O
a a
a
�
b y LL
L
pmt
E b
P
Q
Q
Q
P
P
P
P
Y?
P
P
P
P
P
P
Q
P
P
V
V
� n N
P
P
P
P
P
P
b'
w
P
Q
Q
Q
P
P
P
M
M
q
M
N
N
d
o
0
0
0
o
O
O
0
0
0
0
0
0
0
0
0
0
0
0
U
0
O
O�
C.
O
m
O
m
O
m
O
m
O
m
m
O
m
O
W
O
m
O
a0
O
M
O
M
O
M
O
41
O
m
O
m
O
m
O
m
O
m
O
m
L
q q
L Z
P
P
P
P
P
Q
P
P
Q
P
Q
P
P
P
P
P
P
P
P
P
d S�
O
m
m
m
m
m
m.
2=
V U
Z
b
b
VI
Y]
w
N
N
N
Yl
N
b
b
N
b
Yl
b
b
N
VI
b
d O
O d
N C C
O
O
O
O
N
N
N
m
Q
Q
N
N
10
(O
O O
O
O
O
O
O
O
O
O
O
O
O
OO
O
O
O
O
O
O
O
O
� d
U rc d t v a
E y y
p>p> d
U 5 3
J F 2 N G
[7
N + +
C
E
T m Y
a LL LL
Q
4
E##
O
N
P
m
O
o
T
T
r
m
M
N
b
T
M
w
m Z
z g
�
a a
U U
G
7j
lL
N N
ry
0
O
0
M
0
m
0
N
0
Q
M
N
M
o
O
0
T
0
n
P
o
N
M
T
b
n
b
O
v�
M
m
o
T
N
y
N
N
O
(7
T
N
N
M
V
f
b
n
m
T
T
N
b
N
n
M
M
b
n
m
VI
N
O
M
W
N
N
N
T
A
m LL LL
wO�
a
F � ❑
�
in
o
m
m
n
m'
voi
M
ry
o
m
uwi
m�
v
n
o
H
voi
N
N
P
N
Q
l0
m
n
T
m
N
O
b
m
N
V
P
M
n
m
T
r
N
T
b
O
N
M
m
b
b
M
n
O
T
n
O
N
� N
O
q
N "
J
FJ
O
O
m
O
r
N
m
P
0
O
P
n
T
m
w
m
m
b
m
m
N
N
T
P
T
m
T
T
n
O
1�
VI
V
m
O
O
b
m
O
n
T
P
T
m
Imo.:
n
M
N
O
M
(O
P
N
T
m
M
m
P
W m 0
m
m
N
N
N
II VV
m
a
m
¢ a
w
m
b
N
N
O
O
N-
m
m
m
g
w
m m
O
M
N
"^
N
N
N
N
Qq
d
O
O
O
O
O
O
O
OO
OO
O
O
O
O
O
O
O
O
O
O
O
O
b N
d o
1d-�
m mm
ems.
a E w N N N
= o
O N M
Z
E
N V m
n
Q
f0
m
N
b
m
T
Q
P
n
N
m
M
O
r
o a
N
N
N
N
N
N
M
N
d d
0
MN
L
A V p C T
U 6 N T! 3® N
m
0
P
e
e
v
e
v
e
0
Q
0
Q
0
Q
0
P
0
a
o
Q
m
M
W
m
W
M
m
W
M
W
M
W
M
W
M
m
M
r
M
m
M
N
m
P
M
m
w
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
o
d
a
_
m
N �
�
g
j
N
ry
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
o
�
U
W w
b �
J Q
p
m
M
O
O
M
m
m
N
O
W
Q
O
N
W
m
n
M
m
r
W
N
M
Q
P
Q
Q
N
N
P
N
N
N
m
m
Y1
N
Q
P
Q
M
m
mN
N
N
O
O
O
m
W
W
OR
m
n
n
m
m
a
N
v
VI
v
N
v
N
a
N
v
N
v
N
a
N
e
e
VI
o
N
e
VI
v
N
v
N
v
v
N
v
V]
v<
N
P
v
P
v
Q
v
Q
OP
v
v
v
Q
V
V
P
Q
Q
O
O
W
W
W
m
R
OR
r
r
b
m
N
P
Q
M
M
N
N
O
W
W
m �
r
'
0
0
0
of
m
of
of
of
bi
of
�
m
m
m
m
of
bi
bi
m
m
ai
m
m
a;
m
ro
W
G
o
m
m
m
m
n
r
n
n
n
n
r
r
r
n
n
n
n
n
r
n
r
n
n
n
n
r
W
r
r r
6
6
6
6
6
e
e
v
v
v
6
6
6
v
P
i
v
v
v
6
6
e
sr
v
v
e
6
C
m
m
rn
m
m
A
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
rn
rn
m
m
m
ZN
N
N
N
M
N
N
N
VI
N
N
N
N
N
YI
N
N
N
N
M
N
N
N
N
N
N
N
O
Q
r
r
W
N
W
Ol
W
N
W
m
W
W
W
M
O
m
O
D
Q
m
N
N
m
N
M
N
m
W
M
M
Q
r
V
N
m
N
O
m
Q
m
W
m
M
r
M
W
N
N
n
N
m
W
M
Q
N
Q
O
N
Q
N
W
N
M
W
W
W
M
r
r
W
CO
P
W
m
O
R
W
O
P
O
N
m
N
m
M
O
Q
n
Q
N
m
0
0
0
0
0
0
0
0
0
4
N b
Z �
O
P
O
m
O
W
N
N
M
N
N
N
W
O
N
N
O
Q
O
N
N
P
O
P
N
Q
N
Q
O
Q
O
Q
N
M
b
M
O
M
N
N
N
N
N
N
N
O
M
VI
M
O
M
Q
r
O)
O
N
Q
m
n
W
N
Q
m
W
W
M
P
m
m
N
M
N
W
0
O
d
Y
a
p>m
F
r
W
VI
N
O
N
O
n
O
W
O
N
O
P
O
m
r
N
m
O
W
Yf
n
oo
,0
O
m
N
•.r
r
O
r
O
r
N
m
O
m
O
W
O
W
O
f0
m
O
r
N
m
F w
M
N
Q
N
N
M
n
n
m
b
O
f
f
O
fD
N
N
P,
O
r
N
Q
N
m
Q
N
W
W
h
O
VV 1I
G
N
N
O
IR
of
W
of
ai
m
K
r
m
ai
ro
n
r
m
r
of
m
of
m
m
a
ci
ei
o
0
0
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
E _
N :..
A
N
a
O
N
O
N
O
N
O
N
O
N
O
N
m
m
m
O
N
N
N
N
N
N
N
N
N
M
N
N
N
N
N
N
N
N
N
M
N
N
n
N
r
N
r
N
W
N
W
N
W
N
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
b
C °
b
r
N
W
N
N
O
N
O
n
O
W
O
N
O
Q
O
f0
FI
r
N
W
O
W
N
n
O
m
O
m
N
1�
N
r
O
n
O
n
cq
O
O
O
O
N
O
VI
N
Q
b
r
W
N
Q
m
r
W
M
Q
m
m
W
m
Q
m
W
O
M
N
m
Ci
M
M
M
M
Q
Q
Q
Q
Q
Q
N
N
N
N
N
Yf
m
m
m
m
m
n
r
r
r
n
�
p Y
r+
H
mW
o e mM
MMNNN
OMOO
C
C
G
O
O
O
O
O
.
O
O
On
Om
ONN
O�Nn
OmN
O.W
Nq03
Y c
m
N m
h
�=
N N
(n
N N
N
y d
o
M
O
M
O
m
O
N
O
O
P
O
H
M
O
M
O
O
O
M
V
O
m
N
m
O
O
O
O
N
O
P
p
O
Of
O
Ny
O
O
O
0
P
Z
p
o
0
0
0
0
0
0
d
d
o
0
o
d
c
d
d
d
d
d
d
d
d
o
d
o
r
U
a s
U
Q
w
m �
M �
M
m m an d
m
V
� U
W W
M
n
N
OI
m
O
N
N
m
N
m
M
P
Ol
N
b
W
N
N
N
m
N
M
VI
m
m
10
m
N
y
VI
N
n
Q
b
Q
N
P
m
M
(O
M
m
M
N m
r
N
N
N
VI
N
P
N
N
N
N
O
N
OI
W
W
W
W
W
m
O
N
15 ti U
P
j b
J
P
P
P
P
Q
P
Q
Q
Q
O
P
Q
Q
P
Q
Q
Q
Q
Q
P
Q
¢
N
m o
a
n
n
n
n
n
n
n
n
r
r
r
r
n
r
r
n
n
n
r
n
W
W
m
Q
Q
�
01
M
b
01
b
P
1P0
m
M
n
N
M
W
N
m
P
M
M
m
P
A
P
ONl
b
b.
m
m
m
.
m
.
m
.
m
.
m
m
.
m
m
m
m
m
m
.
m
.
m
m
m
m
o
m
m
m
.
m
m
m
m
m
m
m
m
m
W
c c
e
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
r
r
r
r
m
m
m
m
o
m
rn
rn
m+
m
m
m
m
m
m
m
m
m
m
m
m
m
m
W
L
i m
m u m
9 L U mL
n
n
O
W
P
W
m
W
61
P
m
n
OI
0
O
M
0
m
0
m
0
M
N
N
m
m
O
N
N
N
N
M
N
P
N
P
N
P
N
M
N
M
N
N
N
m L
C�� 0 d
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
lJ
U m r m T N
�
�
�
�
�
�
�
L m q
2 Z H D
�•
r
O
Q
m
f0
b
n
M
W
O
m
n
m
M
O
O^
YI
N
m
O
P
m
P
N
W
N
O
M
W
O
n
n
n
m
n
M
n
W
n
N
N
N
N
N
N
N
N
NN
1p
N
N
N
11
N
NIL
Cl
Vl
l?
M
M
M
m
3
J
m
C
LL
o
M
P
N
Q
N
m
P
y
O
p
O
m
m
m
m
m
m
y
m
m
n
P
n
m
b
m
P
m
m
N
P
W
m
m
W
m
m
N
P
M
m
M
m
P
m
P
N
M
N
m
W
O
N
M
N
n
W
O
N
M
N
n
m
N
P
W
W
M
N
n
OI
Nb
n
n
VI
m
Q
m
M
m
M
Q
M
P
N
Q
N
m
e
m
O
P
O
m
r
m
Q
m
m
W
P
N
a
M
Q
N
N q
m
f0
P
n
P
W
P
W
N
N
Om
TW
m
m
Mm
m
m
Qm
7m
Wm
Nm
N
O
m
O
.
N
n
.
P
N
m
N
oz
I�
m
O
Nm
O
N
m
N
OI
r
N
N
O�
Of
b
f0
O
m
N
Q
p
N
O
f
m
O
b
Q
N
N
Q
n
Q
N
M
n
W
p
m
n
P
P
P
N
N
O
G
C
1�
N
V
t+i
O
0
b
t7
Oi
Q!
N
Oi
L
O
O
O
O
O
O
O
O
O
O
O
O
O�
O�
m
O
01
01
T
W
W
W
n
n
r
'-
n
b
E —
A
m
w
�
a
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Qq
O
C
O
O
O
O
O
O
C
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
V
U
Qm O
Q a
L J Q N N N
t N
N
N
O
N
N
b
fU
m
N
N
P
V
M
N
N
N
O
N
W
N
m
O
N
M
b
n
f n
W
m
�
N
N
01
W
M
O
n
y
W
N
m
W
f
Q
m
m
M
n
m
N
Q.
m C
M
6 O L
E m .�
mT
t
O
o m m
i�ar'�n33o
0'
M
V
P
e
N
fO
m
h
W
m
o
N
M
M
P
-
m
n
m
w
m
o
N
M
I
m
O
O
O
O
O
O
0
0
0
0
�
�
�
�
�
�
�
�
�
N
N
N
fV
N
D
1W
.OSS
m
N N
�
� U
O
. O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
G
O
O
a a Z
U
N N ¢
A V
❑
m m
M M ❑
O �
A
J J J
M
b
n
m
n
b
M
M
P
b
m
m
O
M
P
b
n
n
m^
M
O
Q
N
N
N
N
M
M
Q
P
I()
m
n
m
w
O
M
P
b
m
n
m
m
O
N
Qv
M
e
PP
.- SS E uYi
w
e
QP
QP
a
e
v
e
a
v
v
a
a
v
o
v
v
v
v
V
O
N
m
OM1
f0
N
O
r
N
M
tQ
N
N
N
M
P
Q
m
r
0
N
0
N
0
o
m
m
m
CR
h
n
n
n
m
b
m
b
<o
b
b
b
m
m
m
b
m
m
r
r
n
n
n
m
m
b
b
b
b
b
m
m
m
m
m
m
b
m
m
m
m
m
m
m
m
m
m
m
`Fy A
h
n
n
n
n
n
h
n
n
h
h
n
n
r
r
r
n
n
n
n
n
n
w
h
w
n
m
r
m
h
m
n
m
G
N
N
N
N
N
N
m
b
N
N
b
b
m
M
VI
m
N
N
N
N
N
b
IV
Ifl
b
b
b
O
C d V q
E_ L A
N
N
O
O
w
M
m
r
m
P
M
N
O
w
m
m
b
P
M
N
O'
N
M
O
q E m .E A
N
N
N
N
N
N
N
C
G
OO
O
O
O
O
O
O
O
O W ro A U p
i
�
�
�
i
i
i
i
�
�
U A C T w
P ❑ o � 0
Z m 0
C
Q
M
b
M
m
M
M
P
P
N
m
n
N
O
m
P
m
n
M
O
h
N
r
P
r
b
r
m
h
m
n
m
n
M
n
M
n
b
n
Q
n
Q
n
M
n
N
n
n
O
n
m
m
�
M
lh
lh
th
t7
m
(7
CI
l7
{7
{7
l7
m
O
N
N
P
V
m
fOO
m
O
M
N
b
P
m
w
m
p
M
m
N
m
n
O
O
M
M
b
(O
n
D!
m
N
N
VI
P
n
N'
m
W
M
CI
m
N
m
V
O
v
m
m:':N
b
N
M
M
m
m
-
N
m
-
-
-
-
-
e-
-
-
-
�
-
f
"
-
e-
a
3
P
m
P
OR
P
b
P
P
m
b
P
n
m
M
m
w
p
m
N
w
M
m
Q
Q
b
P
n�
P
10
e
n
m
n
P
m
M
m
m
m
P
m
P
m
P
M
a
P
N
P
M
n
m
w
O
M
M
VI
N
n
r
m
m
P
p
1O
m
m
m
O
O
M
N
b
P
r
r
m
N
M
P
m
m
m
W
N
m
M
N
m
p
OJ
m
O
m
N
O
Vi
N
n
M
M
M
M
M
Q
Q
P
Q
b
b
b
b
M
M
n
r
n
n
m
m
m
m
ON
m
M
m
M
N
P
N
M
M
(p
m
m
V
M
m
P
M
O
r
w
Q
m
m
L
N
(O
m
N
m
P
m
M
M
IV
N
m
N
m
O
P
O
O
r
m
P
m
N
w
O
w
w
m
m
m
r
m
m
m
b
m
b
m
O
m
e
m
Q
m
m
m
E _
a
-
m
a
0
O
N
VI
m
O
m
O
O
m
M
M
M
M
b
M
M
M
N
N
b
N
N
N
N
M
N
M
M
N
N
N
N
N
N
N
N
N
N
N
N
Qq
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
C
QN O
a Q
'OG N YS II1
Z J J J J
m
V1
V1
m
O
b
O
O
N
O
O
O
b
b
N
b
b
O
b
O
O
b
b
b'
b
b
m
m
b
Q
m
n
m
O
M
P
N
m
n
b
m
n
m
m
w
n
m
b
M
N
M
r
w
O
M
N
n
m
N
Q
m
m
m
m
O
O
M
N
b
P
n
n
O
N
M
P
m
M
w
m
N
m
N
b
Q
m
m
O
m
O
N
n
q
N
M_
M_
M
M
M
P
Q
Q
O
b
b
b
b
N
m
m
m
m
n
n
n
n
m_
--
0 �
f
--
-
-
--
f-
M
a m
c°�a'di33o
1'n
N
mg
Ya=
W
w m N r W N e M o r m m M P W
Q (O A W O N M N m A O) O r N N N N N N N N Q A N m W
N N N N N M M M M M M M Q Q Q Q P Q Q Q Q Q P Q W N f0
m P M O f P W 01 N P m OI N N W O P W n n W N P` r
M P P N O O O N N Q Q M M N O Q O m Of W N
O O O O O O O O O O O O O O O O O Ni
w �
J O
p O
n M a W n W m W o M W n W N o n n m n o P W o
tW0 W O N P n OW1 N Q IWD W M P N W N N V 6 O Q W N 6
W co 0 W O O O O N M
e e e e P P P P P e P P P P e P e e m N W N VI N N W N
rn P P P P e Q P P P e P P V Q e e e e a P Q Q V Q Q Q Q
N
A 3 n n n r n n - - n - n n A n n - - n n - n - n n n r n
W `
a n n n n n r n n
W . W . nw of of of ai
rn m rn W W m m m a W rn W m W . m m m m rn rn m .
t Y ar < o v e v e 6 v c o v e e P e v o v e v e e 6 6 e v
m m m m m m m m m w m m m m m m m m m m m m m m m m m
ZM N N N N N N N. N W m N N N M N m W w m m m N W N M
M M n o P n m W m m r P o n M W M W o N W
O N P m W O M N n O N P m W O N P N n W O M W W e r
N P N WN ` W'.O W e : W P P P.
W W m m VI W N P M M N O 'O W n W M W(O e M N M m O
M M M M CI t7 l7 th M lh M M M 'i N N N4 N N
Nm
Z ,
P W W W M M r N n n r r n m m m O
O o) O) n
N M P m W m r m m M O m N r N r M M M m N W W r
r U] M W r 01 M m r 01 N P M r M O M m r W O N e
W W W W rn rn Of OI O O O O O N N N N M M M M M
N N N N N N N N N N N N N
S^F+ e f
M N
P. W M W M W M W N n N N' N' W F m � � W m Q H
m m A W W O O O W n M O m N W n m P N
CD m M (00 NW O N V n W P_ Cm'1 N OW O N C tm0 0 O M N n Om1 W Q
W 01 p W O O O O O N N N N N M M M M P e P
N O V O m n N V OI P e Q T1� n N n N m A N 0 m m P W P
M M M M O W N M M N O n N W 01 VI p W N r m M r O N
^ W W W W W W n n r r r n W !Q II1 P M M Ct M P N A O1 O N M
N °v
Q
M M N M O N M M M N N M M n M M M N A M N m N n M� O ON
T
M P M M W m W (D m m m m W W W m m
�
O m W O O O O N O m O m O m W W W W O O N O O O O
e N m r W W W O O O r P OW m n N W r m N P M N
e W W OO � of e W n M O N P W W O N
Of M W W O N P n O1 _ M N W O N Q W W O M r W P W
- 0 0 0 0 O N N N N N M M M M P P P
Q N N N N N N ry ry N N N N N N N N N N N N N N
m
g
0
N
0
N
b
m
H
m
M
m
O
N
m
Q
W
M
m
m
N
n
m
m
m
n
N
nM
p
m
l
T
Q
V
m
O)
n
m
N
m
�
m
m
O
M
m
m
P
W
01
Q
N
N
M
F
W
m
b
W
OI W
W
m
m
m
m
W
m
W
W
W
N
N
N
N
M
Cf
m
Q
Q
b
b
m
m
n
n
m
m
m
W
2
sW{:N
un
m
m
d
m
m
m
m
m
m
m
m
b
m
m
m
m
b
m
b
m
b
m
b
m
m
m
b
m
b
m
b
m
W
m
YI
m
b
m
b
m
b
d.
Z N
O
b
b
b
IfJ
b
N
N
N
Yl
d O_
u�
N
N N
9 a y O J
E C E� d
m
P
O
W
W
�
N
N
d y
N
m
n
Q
O
O
m
b
f
M
n
n
Q
O
Q
b
b
M
N
N
M
M
m
Q
OI
m
M
O
n
I^
VI
m
m
a
a
O
M
W
OI
t't
W
O
Q
m
M
r
W
p O
W
g
a d
z
>m
2 W Oa
U
't
O� d
J
r
a
r
Q
Q
Q
N
W
W
Q
m
M M
O
r
m
n
m
N
m
O
W
M
O
P
m
m
N
O)
1
m
a
N
N
N
N
lh
M
lh
M
Q
Q
Q
i
IL d
W C
>>
d a
<
o
n
a
a
m
Q
N
Q
n
o
m
W
m
e
Q
n
m
ry
Q
gi
n
n
m
o
a
v
Q
m
ry
m
O
m
m
W
m
m
ry
m
�
m
0
m
0
N ii ii
U
voi
v
vi
a;
r
of
�
ri
vi
n
a
ry
6
n
emo,
ei
n
o
6
r
�
'ri
o
vi
vi
of
of
N N
Y
b
b
b
b
m
M
m
m
W
W
m
n
n
r
m
m
m
T
m
m
O
O
N
m
c
W
b
Q
M
O
m
N
W
M
r
b
W
V
r
N
r
N
b
W
0I
r
Q
m
W
m
W
M
m
W
O
N
Q
W
m
M
b
r
m
M
W
W
T
N
M
N
O)
r
Q
r
Q
W
m
M
O
P
N
r
Q
r
Q
M
W
d y
c O
OI W
W
m
m
m
m
W
m
W
W
W
W
P
n
nn
2
m
m
m
m
m
m
m
m
m
m
m
m
b
m
m
m
m
b
m
b
m
b
m
b
m
m
m
b
m
b
m
b
m
W
m
YI
m
b
m
b
m
b
d.
Z N
b
b
b
b
IfJ
b
N
N
N
Yl
d O_
u�
9 a y O J
E C E� d
m
P
O
W
W
M
OI
N
r
N
m
n
Q
M
b
P
Q
O
b
f
m
N
P
b
P
Ol
m
M
M
m
W
OI
b
m
b
b
r
b
�
M
n
N
N
M
m
W
N
O
M
W
OI
t't
W
O
Q
m
M
r
W
p O
W
>m
2 W Oa
r
a
r
Q
Q
Q
N
W
W
Q
m
M
O
r
m
n
m
N
m
O
W
M
O
P
m
m
N
O)
1
N
N
N
N
lh
M
lh
M
Q
Q
Q
i
IL d
W C
m rG
Z
J
m
c
W
b
Q
M
O
m
N
W
M
r
b
W
V
r
N
r
N
b
W
0I
r
Q
m
W
m
W
M
m
W
O
N
Q
W
m
M
b
r
m
M
W
W
O
N
Q
W
m
O
mN
N
m
d
W Q
Q
Q
Q
m
b
VI
b
b
W
m
W
W
b
P
n
P
r
m
m
m
m
W
OI
m
m
�
N
N
a
O
O
M
W
O
W
W
m
O
O
Q
m
N
m
m
.
W
W
N
Q
n
O
b
m
N
W
M
O
N
W
O
N
Q
n
A
M
Vri
n
O
N
Q.
W
O
N
M
n
m.
M
N
P
r
m
M
Q
b
b
VI
m
N
m
m
m
m
P
r
P
r
r
m
m
m
W
m
m
m
m
m
m
O
A N
J
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
M
Q
N
m
Q
r
n
P
fm0
N
W
O
m
Or
m
r
r
N
N
m
M
b
T
b
W
W
Q .
L M
m
M'
W
M
N
M
m
N
b
N
M
N
N
N
N
N
N
ry
M
N
CI
N
Q
N
N
N
N
b
N
Vl
N
Q
N
Q
N
M
N
N
N
ry
ry
N
N
N
E _
m
.w
�
a
d�
g
m
Q
ry
m
m
Q
H
VI
r
N
Q
W
m
M
M
b
W
O
N^
m
W
m
W
P
m
b
m
'
m
m
m
N
m
m
r
W
O
m
W
W
P
m
W
Q
N
d
C
d
O
Q C Q
L
O r LA
O LA
ZJ J J J J
O
m
b
b
b
O
O
O
O
O
O
O
O
O
O
O
O
O
O
b
O
O
O
b
N
b
O
m
m
f m
M
m
Q
O
m
N
P
N
W
b
m
N
m
r
Q
O?
M
W
m
�
Q
m
fD
O
r
m
y
P
M
W
b
m
M
m
b
O
W
O
M
N
Q
Q
W
m
P
m
m
O
M
M
b
m
P
m
a1
W
O
Q
W
M
m
b
m
N
O
Q
p
N
C N
N
N
N
N
N
N
(V
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
M
M
M
4 y O C
0
O
ua'm33 0
'�
iJn
�uuW
W
(U
N
r
N
O
N
Q
n
W
O
N N
b
� s
a
b
W
z
M
a a
Q
P
x x
N
7 7
�
m
M M
�
M
n
W
b
b
N
I�
m
m w
W
m m
2
F
M
W
P
b
E
J K
N
H n
m
4f
N
W
(U
N
r
N
O
N
Q
n
W
O
b
[O
M
b
W
W
M
^
P
m
N
r
W
m
W
W
M
n
W
b
b
N
I�
m
W
W
P
n
F
M
W
P
b
N
N
m
4f
W
Q
m
W
W
m
Q
W
N
n
M
m
W
M
0
m
b
m
W
',2
O
W
M
C
a
O
N
M
b
n
W
O
N
P
r
m
Q
W
m
Q
r
O
P
N H
�
j �
O
O
CD
M
m
O
r
O
W
P
f
b
W
O
m
m
W
M
S
n
W
M
P
N
n
O
m
N
!O
O
fD
Q
m
m
m
N
M
P
N
-q
W
7
g
�
U
O
j
� o
N
r
vOi
n
t0
N
N
V
V'
N
CP')
r
V
m
N
N^
N
N
Q
O
n
0
IM
O
[n0
VI
n
fD
M
M
N
W
N
b
10
N
P
P
N
W
n
P
n
n
m
M
N
r
W
bO
O
N
VI
Oi
M
W
P
O
W
ID
N
Y]
m
N
W'
O
!J
r
!O
fG
fV
m
V
W
O N
N
b
VI
n
VI
m
M
O
b
N
W
Q
10
N
10
r
W
m
(O
n
n
r
r
n
O
M
N
W
n
W
m
W
N
m
P
m
n
m
m
m
N
O
N
O
n
O
C
y y r
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
r
r
r
r
ai
W
W
...
W
M
O
O
P
W
m
N
n
b
P
P
P
(O
N
CrJ
(D
W
N
N
(O
N
O
M
W
W
M
N
m
m
N
W
W
N
N
W
Q
W
N
M
N
M
n
O
W
m
b
r
VI
m
O
O
O
C n
n
n
n
n
W
10
10
W
W
ID
W
10
W
b
N
N
N
N
N
VI
P
P
P
P
Q
P
n
n
r
r
r
r
n
r
n
r
n
r
n
r-
n
r
r-
n
n
r
C�
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Ci
m
m
2 Yl
VI
Yl
N
N
N
b
b
b
Vl
N
b
b
b
N
b
N
N
VI
b
N
W
YI
W
W
N
N
O
M
mO
b
b
Ob1
N
N
m
N
O
N
M
W
n
Vi
VI
N
M
N
N
P
N
W
N
Q
N
N
N
P
b
N
10
r
m
N
P
N
m
Q
O
r
O
M
Q
V
m
N
Q
n
O
m
n
O
Y]
N
P
P
M
fD
M
W
A
i
VI
m
n
P
O
N
M
m
n
Q
W
W
m
f0
P
n
W
M
N
O
N
N
N
N
N
N
M
M
P
Q
P
P
YI
M
b
W
M
.J
m
N
M
O
O
n
n
N
N
Q
N
W
n
P
W
W
N
P
m
m
m
M
n
O
V
m
n
W
O
N
m
n
M
W
P
N
N
b
O
P
O
M
Cl
n
m
N
r
fD
N
(r0
n
W
A
O
W
N
M
N
b
P
O
N
N
N
M
N
N
N
W
N
W
N
m
N
M
M
M
M
P
M
W
M
W
A
M
r
P
NM
N
N
n
P
O
W
O
r
(D
M
W
n
N
N
m
M
f0
M
n
M
Q
W
W
r
P
m
NIR
W
P
N
N
P
m
W
W
n
N
n
m
n
0
m
m
W
m
N
m
00
N
m
f
f
N
m
W'
M
n
n
fO
P
N
N
m
OI
N
fO
W
IV
O
n
M
CI
n
(O
O
01
M
N
n
N
O
r
M
Oi
f0
O
O
�
M
(V
W
;�
O
ei
O
ai
ri
vi
N
of
N
co
N
m
M
of
qi
M
of
vi
ri
m
m
m
vi
ri
M
M
ei
vi
ni
n
of
of
a
�
W
N
W
W
m
P
O
N
m
N
m
01�
O
d
O
n
001
N
N
m
M
O
N
O
IR
K
n
W
O
b
N
O
Q
Q
W
W
N
W
10
N
O
P
M
W
N
N
OI
N
n
m
M
M
m
10
O
m
M
M
n
n
O
O
Q
N
n
N
O
n
M
W
b
m
m
m
N
O
N
N
N
M
M
Q
Q
Q
N
IQW
b
n
n
r
W
W
W
m
m
m
m
O
� vi
m
m
ai
w
Ci
a7
ri
n
M
n
n
ri
n
M
ei
to
ei
Iti
of
ni
of
ei
of
of
of
v
O
O
N
r
N
P
M
N
N
M
W
N
O
m
O
Q
O
O
M
n
Q
O
M
N
O
m
N
N
M
M
P
N
N
N
N
N
N
N
W
W
Q
M
N
N
N
N
N
M
P
Q
P
P
M
M
N
Q
M
M
N
O
P
n
O
Q
O
M
N
W
W
W
W
n
N
N
N
P
n
W
N
n
m
O
M
Q
N
n
W
O
N
Q
N
fD
n
W
O
N
N
M
P
N
10
10
a
N
N
N
N
N
O
Q
m
N
O
O
O
m
N
n
N
W
N
W
N
n
N
n
N
n
N
n
O
O
N
O
W
O
O
M
O
N
O
n
O
O
O
N
O
O
M
'
W
2
�'
�MOO
Mwe
uuW
jM
a=
In
m
U
C
N
Q C O Q
L J N N N
pn
z J J J J J
C
U i H 3 3 v W
m
m
n
n
Ul
m
N
ci
W
r
m
m
M
n')
�-
�
m
m
r
m
m
b
O
l`
P
n
N
m
O
N
fp
VI
m
Q
m
O
m
M
M
Q
b
m
M
n
yr
Q
n
r
ro
0
W
O
N
M
W
h
W
di
pi
0
�
N
M
VI
W
n
m
O
N
M
P
W
r
n
D
n
O
W
P
W
n
W
O
m
m
m
m
m
OI
m
N
O
b
O
m
O
N
b
W
N
P
N
n
N
O
M
M
M
n
M
O
Q
M
Q
m
Q
O1
P
N
b
b
b
m
b
m
j =
o
0
h
N
n
n
N
N
N
p
M
N
W
m
W
O
O
P
m
Q
M
m
W
VI
a
N
m
CJ
O
O
b
m
n
F
P
N
Q
m
M
W
O
O
m
N
0
0
0
o
U
�
U
rn m
d S
� O
ubi
m
m
N
m
M
V
m
�
ro
r
V
N
O
W
Cmt
P
m
W
P
m
b
b
m
m
m
rn
O
e'
r
m
N
N
N
N
M
(y
W
M
m
M
N
P
Q
P
r
P
m
P
N
YI
P
b
n
b
O
m
N
m_
VI
b
n
W
O
n
N
r
b
r
n
r
C
s
m
m
m
m
m
m
m
m
m
m
W
W
W
m
W
m
W
W
m
m
m
m
m
m
m
W
m
n
m
N
n
O
N
VI
m
O
VI
M
h
n
m
M
r
N
b
C]
P
O
N
M
O
O
M
W
N
N
m
n
O
M
m
ON
N
b
m
O
M
b
r
T
M
n
m
m
m
rn
m
m
Q
M^
m
W
P
N
m`
O
r
m
M
Ol
m
fp
P
N
Z C
M
P
M
Q
M
Q
M
P
M
Q
N
N
Q
N
Q
N
Q
N
P
N
P
N
Q
Q
Q
Q
Q
Q
Q
Q
O
Q
O
P
O
P
O
P
m
M
m
M
m
W
m
M
S
M
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
=
b
b
VI
b
b
b
b
b
b
b
m
N
b
m
m
m
m
m
b
b
b
b
b
b
b
b
b
O
m
r
n
N
O
N
b
O
n
O
r
m
O
m
n
n
W
m
M
b
Q^
m
m
m
O
N
n
Q
m
O
N
N
n
O
M
m
W
O
N
Q
p
P
n
N
n
W
M
m
m
N
m
Nl
pl
Q
m
b
O
b
O
W
m
n
N
n
N
n
N
W
Q
m
n
W
N
W
N
n
m
n
n
r
ON
W
W
b
m
m
O
m
M
m
m
m
m
O
m
O
m
O
O'
^
m
O
N
M
N
b
N
m
N
O
M
Mm
O
W
N
N
O
Q
Q
m
N
M
O
N
CmJ
N
O
O
N'N
O
N
N
T
m
m
m
m
b
M
m
n
M
O
m
m
P
N
O
W
m
W
M
N
m
W
f
W
M
N
O
o
q
v
g
n
h�
n
h�
n
e
n
cmp
n
n
n
n
n
n
n
W
m
m
m
w
m
N C
�
m
M
e
m
m
m
m
m
o
v
o
0
0
m
vQi
vi
e
m
a
n�
N
a
vPi
v`�i
o
o
N
M
Q
m
n
m
O^
N
M
P
m
m
m
r
r
m
W
W
W
W
m
O
O
^
mN
OI
O
O
m
O
�
^
m
N
P
N
n
N
O
M
M
M
m
M.'.
m
m
N�
y`':.Q
m
W
P
m
P
m
r
m
O
m
M
m
n
m
O
n
Cl
n
m
n
m
n
d
p
th
P
Q
Q
O
Q
Q
P
Q
Q
Q
Q
e
C
P
A
P
P
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
p5N %.
F
m
m
mm
O
r
m
N
m
N
om9
ro
Ci
M
Q
Q
fmp
0
m
F"
n
D
P
N
N
N
tb+l
m
W
m
O
O
M
Q.
Q.
m
m
m
O
m
m
O_
m�
O_
b
N_
N_
r
N_
O
M_
P
M_
n
M_
P_
Q_
fp
P_
OI
Q
N
m
N
b_
W
m_
p
b
m
N
_
_
_
O
N
O
O
N
M
Y
n
0
0
N
Ol
b
W
O
N
P
m
r
pml
O
m
m
m
Q
Q
Q
P
P
Q
Q
VI
b
b
b
b
b
b
�p
W
m
m
m
m
n
n
m
m
m
W
n
�
�
�
�
�
�
�
�
.i.N••�ri�.
N
N
N
��
�
�
�
N
H
N
N
Y
q �
Q
nn
N
m
m
M
O
W
r
n
r
O
Cbt
fNp
m
W
W
M
N
m
P
P
N
M
N^
m
VI
b
b
b
m
N
Q
P
P
Q
b
b
m
m
VI
W
m
m
W
b
m
b
b
m
m
m
Q
P
Q
Q
P
Q
Q
Q
Q
Q
Q
Q
P
Q
P
Q
P
P
P
P
P
Q
Q
Q
Q
Q
Q
U
C °
m
b
N
m
b
m
m
N
m
b
O
O
O
O
OO
m
O
m
b
O
m
m
b
O
O
b
O
O
W
f
n
N
n
M
O
m
W
m
b
b
M
�
n
M
m �
W
ON
N
n
N
P
m
M
W
N
b
N
b
O
Q
m
n
N
P
m
ml
O
m
VI
m
p1
M
N
W`
b
O
c
C'l
Ih
Vl
r
O
V'
P
n
W
O
M
p
N
M
M
Q
Q
b
b
m
m
h
n
W
W
m
m
m
O
O
O�
Q
Q
P
Q
Q
Q
Q
Q
Q
P
Q
Q
Q
P
Q
P
P
m
b
m
YI
m
m
b
N
b
b
V
b
W N m OJ OOi N OJ O mN r m n I� F CNS A OWi M M tM0 m W r m V N P
N N W V n O M Ib0 N N h m N VO] m P n O M m m N V n
m m m O O O N N N M M M P P P b 1(1 b m m m m
Q Q P P b VI VI N N b m N N N N N N b b M b
a
O
W
N
omi
N
O
O
N
V
m
�
N
N
tPn
N b
N
N
r
N
O V
l
r2
M
W
P
N
M
VI
n
W
m
W
A
M
P
P
N
M
W
no,
o 0
P
n
M
W
n
W
n
W
'p
P
n
O
Q
n
O
M
W-
N
b
m
Q
n
O
M
W
m
N
N
m
Q
Q
n
O
,O
m
�
W
�
n
�
n
�
A
�
m
�
W
�
W
�
W
W
�
m
m
O
O
O
r
N
N
N
M
M
M
P
�
p=
a
�
N
n
o
W
M o
W
M
m
M
n M
N o
W
o
H
M
M
r
n
o
r
N
m N
g
N N
O
0
O
m
r b
P
P
N
m
m O
O
Q
m
O
m
m
P
T
N
ID
W N
a
N
P
P
P
N
Q
Q
P
Q P
P P
Q
P
P
Q
P
P
M
Q
M P
P P
P Q
P P
N.
P
P
r
N
M
O
M
7
W
n
m r
P Q
M
P
b
O
V
01
W
W
O
Q
g
O
O
O
O
O
O
O
O
O
O
O
0
0
0
0
O
p L
a a Z
E d o
U
Q
w
m �
Q
D
� o
t a ,
o
Z J J J J J
N
N
O
O O
O
O
W
O
O b
VI
N
O
N
b
O
O b
O
O
O
O
N O
M M O
^
K
Irp Ino a
M
r
r
O
b
M
O
m OI
Q
N
M
b
r
W
b
p r
O Q
O T
m CS
m
r
N
N
m
b
O
r
Q
O M
m M
W
r
m
fO
N
W m
Q N
Q.
Q_
N
Yf
co
m m
r
r
W
W
m W
Of O
O
O C
T
G
r
IR
Yq
In
,WO
N
r
N
IR
N
N
-I
G
ct
N
OOi
M
VI
m
r
OOi
Oi
d
N U t5 U
N
Ih
N
Ih
N
W
Vi
G
O
M
n
N
tG
O
O
ai
nt
1�
Y)
Oi
M
0
N
0
Q A E b
W oR
0
W
0
m
W
m
'
e
O
O
O
O
O
eN'
r
m
N
N
N
N
M
M
M
M
P
Q
E
a w
i
of
s
w
a.
m
ai
pi
pi
ai
ai
ai
a
m
m
m
ai
Nq
q O
n
n
n
n
n
n
n
n
n
W y
O
A
m
m
N
m
N
O
W
O1
�
m
W
N
W
Ol
�
W
OI
Vl
N
M
W
N
m
M
Q
n
OI
N
N
W
PI
m
m
C
d
O'1
m
M
m
O
0
0
pnl
r
M
IWO
co
m
m
N
C Q
C m
m
m
m
m
m
n
n
n
n
n
n
m
m
m
l0
m
W
b
N
Y]
N
N
VI
P
Q
V
L
L M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
W
M
m
M
o
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
M
m
d p
C b U ry
V d C
E g d
f
M
W
m
n
P
n
m
Q
M
W
P
Q
W
P
OI
m
M
N
P
d
W W
O
N
m
m
M
M
P
Q
W
Q
N
Q
M
M
�
m
n
W
m
N
N
m
N
N
m
M
P
m
Q
O
m
W
N
N
W
O W d d U d
M
P
M
n
O
n
N
�
b
n
W
N
n
Q
n
Q
P
W
m
W
O
M
N
n
O
N
VI
T W
N
b_
b
m
m
m
m
n
A
n
A
q
22
O
U
O
M
N
m
0U
N
p
N
r
O
P
W
N
n
n
W
m
Q
N
O
n
W
W
P
N
IAS!
01
01
m
W
O
O
O
O
O
ON
N
N
N
N
N
M
MM
M
M
P
IL m
m c
,-
7
7
7
7
7
7
7
7
7
7
7
m
_c
N
N
01
W
P
M
P
M
M
Q
Oni
M
IPp
n
O
fP'�
,fl
N
tb+I
QQ
m
N
M
N
N
M
Q
Q
b
N
fpp
1`
m�
W
m
W
T
W
m
O
O
O
O
N
N
N
M
P
P
Q
Q
b
VI
VI
m
O,
W N m OJ OOi N OJ O mN r m n I� F CNS A OWi M M tM0 m W r m V N P
N N W V n O M Ib0 N N h m N VO] m P n O M m m N V n
m m m O O O N N N M M M P P P b 1(1 b m m m m
Q Q P P b VI VI N N b m N N N N N N b b M b
a
O
W
N
omi
N
O
O
N
V
m
�
N
N
tPn
N b
N
N
r
N
O V
r
r2
r
� r2
n
r2
r
r
r r
r
di
ai
ru
m
m m
of
m
m
m
o 0
E
a
p=
a
�
N
n
o
W
M o
W
M
m
M
n M
N o
W
o
H
M
M
r
n
o
r
N
m N
g
O
0
O
m
r b
P
P
N
m
m O
O
Q
m
O
m
m
P
T
N
ID
W N
a
N
P
P
P
N
Q
Q
P
Q P
P P
Q
P
P
Q
P
P
M
Q
M P
P P
P Q
P P
P
P
P
P
b
P
N
Q
P
P
P VI
P P
N
Q
m
P
m
Q
W
P
m r
P Q
q
V
V
y
p L
E d o
Q
t a ,
o
Z J J J J J
N
N
O
O O
O
O
W
O
O b
VI
N
O
N
b
O
O b
O
O
O
O
N O
^
M
r
r
O
b
M
O
m OI
Q
N
M
b
r
W
b
p r
O Q
O T
m CS
m
r
N
N
m
b
O
r
Q
O M
m M
W
r
m
fO
N
W m
Q N
Q.
Q_
N
Yf
co
m m
r
r
W
W
m W
Of O
O
O C
T
o
Ed a w
o a m
.d.
c°�a`in33o"
m'
c
m y O G T
u O A d d d J
U 6 W3:
m
w
N
m
N
m
W
W
m
M
N
P
n
N
GI
m
m
W
W
N
O
n
M
W
m
W�
N
M
VI
m
O
Q
P
m
N
VI
m
m
m
n
n
n
W
w
w
W
W
W
O
O
O
N
N
N.
m
N
N
N
N
N
N
N
lV
fV
N
N
N
N
N
N
N
N
N
M
M
M
M
M
M
M
M
m
p^
W
N
N
M
N
n
O
W
W
W
WR
M
n
m
N
b
P
r
N
N
N
O
O
n
N
g
O
OO
�
U
W a
a c
J
O
0 r
m
m
VI
m
M
b
N
N
w
N
m
m
b
P
W
N
n
M
P
P
n
W
001
N
OWI
O
N
w
O
m
�Wp
V
N
^
p
ym
m
W
N
M
w
0
M
b
m
O
M
W
w
m
W
m
m
P
m
W
E
m0
N
W
OI
m
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
N
N
N
N
N
W
m
m
W
O
NN
O
1%
M
m
M
M
W
VI
O
M
P
P
w
n
N
m
m
W
m
P
M
m
N
O
m
m
P
N
O
W
P
N
O
m
f
M
W
n
N
O
W
P
N
W
n
C
t N
Q
M
P
m
m
m
M
M
C]
M
M
M
M
M
N
M
N
M
N
M
N
M
N
M
_
CJ
m
6
M
0
M
0
M
0
co
O
M
O
M
W
N
W
N
W
N
01
N
m
N
m
N
C
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
2
N
m
m
b
W
N
m
m
N
N
VI
m
W
N
N
N
Y]
m
b
N
m
m
b
W
b
m
N
m
W
N
P
N
n
M
O
0
m
b
N
O
O
N
b
O
V
m
W
w
0
V
n
W
N
Q
m
W
M
b
m
M
m
m
M
m
w
m
f0
m
P
m
W
N
A
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
W ]
y
W<`
Wr•
p
p
O
Wm
N
m
n
CJ
m
N
P
P
N
n
V
M0
m
n
N
N
r
O
CNI
m
O
VI
IN
m
b
r
W
W
O
M
P
m
m
O
N
P
n
W
N
m
n
O
N
P
n
m
m
N
n
W
M
w
n
D
N
P
m
m
O
M
W
n
W
P
b
m
M
m
W
r
W
W
W
n
m
W
w
r
M
n
o
0
w
P
m
Q
m
n
m
m
m
M
Q
a
N
W
w
m
P
N
O
P
m'
�
W
W
W
n
r
n
m
m
m
m
m
W
W
W
O
O
O
O
W
W
N
P
N
W
N
m
N
M
y
ml
VI
m
N
N
m
W
N
N
N
b
N
b
N
N
m
m
m
b
m
m
m
m
m
m
m
m
m
a
o%Omi �
Y `
PP
M
O
n
m
W
W
O
W
W
N
w
W
b`
N
N
n
N
m
N
W
N
N
O
m
O
M
P
N
n
m
W
m
W
m
m
O
N
W
n
r
W
M
n
W
M
N
O
w
O
n
P
O
m
N
m
M
W
M
r
N
m
O
M
n
b
O
O
M
n
m
n
W
r
N
m
P
W
n
W
O
W
M
W
m
W
m
W
O
O
m
D
O
M
m
m
N
M
N
m
N
w
N
O
M
M
M
m
M
W
M
NO
n
m
O
W
O
r
m
m
N
O
m
O
n
M
N
N
N
b
m
M
,O
m
W
n
m
N
P
M
M
N
N
N
N
N
N
Q
N
n
n
m
W
b
m
w
co
O
-t
CJ
[00
M
f
Cot
-
-
-
-
-
-
-
-
-
-
-
-
�-
-
�-
-
E _
N :..
m
N
Q
n
O
O
b
N
M
M
W
m
m
b
O
O
n
O
M
M
O
O
m
O
N
O
n
n
W
m
W
o
o
N
m
o
M
n
^
b
M
W
N
m
n
M
m
n
W
n
n
m
m
N
N
N
h
N
yn
y
N
N
N
N
P
P
P
P
P
Q
P
P
P
m
m
VNI
m
W
N
N
IP(1
b
u
c
N
b
m
W
b
b
W
m
w
O
V1
O
VI
m
N
b
m
O
O
m
O
O
O
O
O
O
6)
N
m
W
W
m
n
n
m
m
N
M
cm
m
m
n
n
n
m
W
W
W
O
O
O
[V
N
M
M
M
Q
P
N
m
N
m
m
1�
�2
b
m
m
M
m
N
Q
M
W
N
m
n
O
r
N
M
N
m
O
n
N
Q
Cl
W
N
N
W
NN
A
N
m
m
N
m
Q
r
m
m
m
N
N
m
M
b
N
N
Q
r
O
1'az
SM,W•w v
M
M
M
M
M
M
Q
M
P
M
P
M
m
M
VI
M
m
M
m
M
m
M
m
M
r
M
r
M
n
M
r
M
W
M
W
M
W
M
m
M
m
M
m
M
m
M
O
Q
O
P
O
Q
Q
3
m
a=
M
W
N N
d d
m
N
O
M
y
V
N
b
m
n
tm0
vml
IR
V
n
m
m
O
N
n
umi
1�
n
0
m
N
O
y
O
tN0
a
a a za
w
U
V V
W W
N N ?
Q
m
N
O
r
P
m
m
m
r
N
YI
h
m
m
W
m
m
r
n
m
n
Q
m
m
b
m
N
Q
r
W
n
Q
m
N
N
b
W
m
O
m
N
m
M
m
m
M
Q
W
N
O
O
O J
r
O
N
P
m
M
n
m
b
m
m
m
O
m
O
b
0
j W
C
N
N
N
M
M
P
Q
P
e.
P
N
b
m
m
m
b
n
n
r
J tt
E�
C o
q; N
0
N
0
N
N
N
0
0
N
0
N
0
N
N
N
0
N
0
N
0
N
0
N
0
N
l0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
d
N
r
N
M
r
m
Q
m
C)
O
O
n
Nr
P
m
P
r
O
m
m
N
M
M
M
m
n
Q
N
m
m
M
m
m
r
r
cn
d
m
N
m
r
m
IQV
m
b
m
Q
r
u
Cd
p,
M
m
n
M
m
M
M
ry
o
W
m
N
M
o
m
b
N
o
W
{
t E �. N
W
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
`
0 n
m
r
m
n
n
n
m
n
m
n
m
n
m
n
m
n
m
h
m
n
m
n
m
m
n
n
n
n
n
n
n
n
n
n
n
n
� C
Z b
m
N
N
N
N
N
W
VI
m
m
N
N
N
h
N
m
b
m
b
m
Yf
n
m
m
m
m
0 d
C d U q
9 U U 0
b
Q
m
C]
m
b
m
m
O
N
m
W
Q
O
h
m
n
m
m
m
m
m
m
m
O
N
i 0
4 w
N
n
M
m
m
m
N
m
N
m
W
m
W
r
W
O
Q
M
m
m
m
r
r
m
MN
n
N
r
M
m
V
m
b
O
(�
m
m
m
n
n
n
r
m
m
m
N
m
m
m
m
O
O
o
N
N
N
t y p
U p>p>
zip A N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
M
m
m M
M
o M
M
M
M
M
M
M
2 O N9 W
D
U�
Y
aO
N
m
W
m
Q
et
b
M
m
r
b
N
o
r
m
et
b
m
N
M
O
N
m_
Q
m
O
N O
m
M
m
m
m
W
m
O
b
m
Nof
m
M
N
V
UI
N
M
V
N
t0
10
10
1�
n
Ih
N
W
b
t'i
C
n
Q
m
m
Q
r
m
h
N
O_
O_
N
N
N_
N_
N_
M
M_
M
M
M
Q
Q_
Q_
P_
P_
Q_
N
N
N
N
N
N
N
N
_
N
N
N
N
N
N
N
N
N
N
N
N
_
N
C0
rn
m
c
LL
r�
r
m
b
m
Q
W
b
N
M
N
p
m
p
N
O
N
m
O
O
N
O
Q
Q
N
Q
m
m
N
O
N
b
M
m
r
n
Q
OI
Q
N
M
m
n
m
O
m
m
N
N
M
I
N
m
r
m
N
n
M
M
m
m
W
m
N
Q
m
m
m
m
M
N
O
m
n
r
m
O
M
N
O
m
m
m
O
O
M
Q
m
zp �
N
m
O
P
m
P
W
M
m
n
Q
N
m
m
W
m
m
Q
o
P
r
M
n
r
n
M
m
h
M
r
m
m
N
N
m
N
m
m
m
N
N
N
b
P
m
r
m
b
O
O
M
Q
m
m
r
p
O
O
M
m
b
M
m
m
O
m
M
M
m
O
m
n
O
R
n
O
O
m
N
n
m
n
m
n
n
Q
n
r
W
O
m
M
O
r
O
M
M
b
N
n
m
m
m
m
r
r
r
W
W
W
W
m
m
m
O
O
O
d
m
Q
Q
m
a,
n
m
Q
r-
m
m
N
lc
M
o
n
m
e
h0
o
m
�u
o
7
n
v
r
a
n
m
m
N
r
ry
m
a
o
m
a
o
m
m
W
ai
m
m
m
m
m
of
o
0
of
ai
di
m
m
n
r
n
n
n
ao
m
W
m
W
ai
w
a
m
N
a
�
N
N
O
N
N
7
7N
O
N
N
N
W
W
m
M
m
r
M
r
r
n
W
n
r7
O
W
n
O
M
b
m
m
N
O
m
m
m
N
O
m7
m
r
n
m
YI
N
N
N
VNI
b
N
O
O
O
O
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
P
Q
Q
M
M
{JQp
U
V ...
E d o
Z J J J J J
O
O
b
O
O
O
m
m^
m
Q
O
N
m
m
m
O
b
W
O
m
m
O
O
m
b
O
m
m
m
m
Q
m
N
m
N
n
M
r
N
Q
M
N
M
N
N.
M
M
�
m
m
W
m
N
YI
(p
m
m
M
N
r
O
N
O
m
O
N
Q
M
Q
N
N
m
m
O
I
P
m
W
m
Nm
Q
r
et
W
m
m
m
O
m
O
O
N
m
N
N
i
M
M
P
ro
Q
m
i
m
N
b
b
n
n
ri m
m
.
m
m
ai
vi
m
a
m
ac
ai
a
re
W
ac
a6
ac
o
�
a el
o
Ed i_
o
z
/*��
i�a`ui33 0"
h
W
Ego
IO
O
M
m
N
m
n
W
W
W
CJ M
o
n
N
W
Q
m N
m
Q
w
m
N
M
W
N
N
O
m Q
N Q
N
O
W
M
N
Q N
m
N
W
Q
P
N
W
W
N
W
n
W
V
N
M
M
Q
Q
Q Q
N N
N
m
m
r
n
M w
w
O
y Q Q
p
Q
Q
Q
P
Q
Q
Q
Q Q
Q Q
Q
Q
Q
Q
Q
Q Q
Q
N
W
O �
IO
W
m
W
N
m
n
M
W
N
O
O
M
W
M
CJ M
o b
N m
n
N
m
P
O
P
w
M
m
N
m m
w
m
f
N
m
m
n
n
Q
N
N
n
W
N
N
O
W
w
n
M
w
W
P
O
Q
W
W
W
W
O
Q
O
P
W
Q
P
N
W
W
N
W
n
W
V
W�
W
O
P
W
M
w
NO
O
W
J O
P
N
n
lV
n
M
w
N
N
n
N
M
W
z ;
O �
N m N
N
N
N
m
m
O
N
m
N
m
N
n
P
N
m
y
P
O
On
N
m
r
'Q
W
W
n
O
M
M
P
P
m
N
N
7
P
m
m
N
m
m
n
n
Q
N
N
n
W
N
N
O
W
w
n
M
w
W
P
O
Q
W
W
W
W
O
Q
O
P
W
Q
P
N
W
W
N
W
n
W
V
W
O
P
W
M
w
NO
O
W
O
P
N
n
lV
n
M
w
N
N
n
N
M
W
z ;
N m N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
v
O
M
M
w
M
m
m
n
m
W
P
N
W
N
M
P
P
Q..N.
N
m
m
m
n
n
m
w
w
O
N
r
b
W
b
M
m
M
Q
n
O
O
N
M
W
W
O
N
N
O
N
P
M
W
m
r
M
N
W
m
O
W
n
w
INO
W
n
N
Cl
P
r
O
M
b
M
M
M
Q
N
O
O
M
W
W
n
M
M
Q
O
N
N
W
W
N
P
N
Q
N
w
N
Q
m
W
N
W
W
M
O
L M
N
M
M
M
N
N
N
N
N
P
N
m
m
N
r
P
O
N
O
O
O
O
L C N
N
N
N
N
N
N
N
N
N
N
NN
N
N
c
N
N
N
N
N
N
N
N
om m
?
n
m
n
w
n
m
r
w
r
w
r
m
r
m
r
W_
m
r
m
n
m
n
m
n
m
n
m
n
W
n
W
r
w
n
W
r
w
r
w
n
w
Z N
N
N
W
N
N
N
N
M
N
N
N
N
N
N
N
N
N
N
N
N
N
FS �
P
W
n
N
N
N
W
m
O
O
n
N
w
N
N
W
M
pQi
m
W
w
W
O
W
N
Q
W
0
W
w
b
M
N
Q
W
b
M
W
N
L NN
m
m
N
r
N
N
N
M
N
N
w
w
m
Q
M
M
O
n
O
P
O
M
O
P
O
M
O
P
O
P
O
m
N
W
N
W
N
N
M
W
M
P
b
P
N
N
N
n
N
b
M
b
b
W
W
N
r
W
n
W
M
w
W
w
N
O
�
�
W
vi
ci
ni
of
of
M
M
M
ei
ri
vi
of
of
ri
of
of
of
e
T
�
m
m
O
N
m
N
m
N
n
P
N
m
y
P
O
On
N
m
r
'Q
W
W
n
O
M
M
P
P
m
N
N
7
P
m
m
N
m
m
n
M
N
w
M
O
N
m
m
M
O
m
M
m
m
w
O
O
O
N
A
N
m
P
P
N
m
m
m
r
m
W
m
M
N
P
b
m
n
O
w
m
N
N
N
N
N
N
N
N
N
lV
N
N
N
N
N
N
N
z ;
n
n
N
n
b
b
m
b
m
M
M
O
M
m
m
O
M
N
m
P
n
N
m
m
b
M
m
N
m
P
m
M
w
P
M
m
m
O
M
M
w
M
m
m
n
m
W
P
N
O
N
M
P
P
Q..N.
N
m
m
m
n
n
m
w
w
O
N
o a
z'
N
N
N
m
N
N
m
m
M
m
m
m
M
ll
' w
P
N
m
m
N
r
P
W
m
N
P
m
tp
w
N
m
m
M
O
N
n
N
N
m
P
m
N
f
W
m
N
N
M
P
P
N
N
m
m
m
m
r
n
m
w
W
O
N
FS �
pQi
m
m
N
VI
O
Q
Lq
W
0
N
N
O
N
Vmi
m
N<
N
O
m
L NN
m
m
N
r
N
N
N
M
N
N
w
w
m
Q
M
M
O
n
O
P
O
M
O
P
O
M
O
P
O
P
O
E
N
m
R
Q r P n O Q m N N N N N m
M M M M M M Q Q P Q Q Q P P P P P Q Q P P P
E E
¢ ¢
M O O m
30 m M m m m O m W n O w m m m N W W O P
O w m Q m m w M O n o W w M Q Q
Cl r C O a N0 O A N + N w Q P m m N C'1 W M 0 n6
n Q m p m
C� mW Woc u wof � mao dpi p pi
e0 E Ey .npi m pm Cw'1 mw Nomw mW mpQpQpWM MO ^ NN
M
pi e o d d
Z
N
d
O
M
W
O
N
P
N
N
n
N
m
N
m
M
m
Q
m
O
W
N@
m
P
N
N
N
m
Z
N
N N
�
d d a
n
Mw
n
N
n
O
A
P
O
n'
P
m
m
n
n
@
CI
Q
m
m
M
m
N
M
O
a
O
O
O
O
O
O
N
O'
O
n
O
O!
N
N�
(p
Qt
OI
n
Ip
p1
O
a �
M M O
K
d <
m
m
o
m
m
m
m
v�
n
ro
n
I
o
m
e
n
g
n
n
m
O
.P-
�
N
Oi
at
f�
vni
n
Vi
OJ
M
O
Iq
IG
N
c'i
IC
vmi
lV
G
I�
N
Oi
O
d 0 Y
E N
O) n
n
N
m
m
m
Q
01
O
O
N
O
n
O
m
O
O`
h
n
O
N
N
N
N
m
N
m
M
M
m
M
W
M
Q
P
Q
m
Q
m
P
N
P
N
d E cL
p� N
N
N
N
N
N
N
N
N
N
N
N
n
N
N
N
N
N
N
N
N
N
N
N
N
N
N
C
W
q_ n
W
M1
M1
M1
M1
A
A
M1
n
n
n
A
n
n
n
n
n
n
n
n
n
M1
M1
n
n
n
J FM
M
O
N
M
m
O
O
m
m
m
(O
m
@
W
m
N
N
A
N
O
N
M1
01
m
M
n
m
VI
W
m
In
Pm
N
M
N
W
N
W
O
m
C]
N
O
O
M
O
p
Uy'
q
M
O
G
m
Ip
n
m
OO
N
�p
P
{.j
M
r^
N
N
O
�
O
m
m
�
O
n
D•
�
P
N
M
m
�
O
n
W
N
M1
VI
N
rtl
W
J
N
N
O
m
Ld d
L
O
m
m
m
m
m
d�
m
m
Of
W
m
W
W
W
m
m
m
n
n
n
n
n
n
m
y w
L W m
r
M1
n
n
A
m
n
n
An
n
n
n:.
n
n
n
M1
M1
M1
A
A
M1
M1
M1
A
A
n
�
Z
m
N
N
w
m
W
w
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
n
�
N
N
N
N
N
N
N
N
N
N
N
N
Yl
N
N
N
N
N
N
N
YI
N
VI
N
1n
d 0
d y
E N C U
N
n
N
O1
b
N
n
n
N
n
m
m
N
M1
O
W
O
A
m
W
P
m
n
m
b
N
N
n
m
N
n
M
O
M
n
N
m
n
m
O
Q
N
N
O
O 0 W
O O
J z f 2@ C
It
O
Q
O
N
N
O
W@
N
N
N
V
m
M
N
P
m
A
M1
m
m
m
n
N
o1
W
O
m
N
m
m
6]
N
W
m
m
W
OI
m
W
m
m
OO
O
O
O
O
O
O
OO
N
N
N
N
N
lV
N
N
N
N
N
M
M
M
M
CI
17
C�
I?
CJ
{?
CI
f7
{n
(?
t7
M
J
C
n
O
m
n
N
N
m
m
O
m
W
m
b
N
N
N
P
m
n
N
m
P
A
m
O
Id
n
M
m
P
m
N
NN
fU
N
P
P
O
O
P
N
m
P
n
m
M1
m
N
O
N
NN
m
mW
m
P
m
n
m
n
n
W
N
m
n
m
O
O
N
O
N
O
O
OO
O
d
N
P
WP -�
m
m��
m
n
n
.�
M1
�
M1
Q;
n
m
W
a•
b
m
m
W
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
N
m
m
m
m
m
m
@
FFFp
m
O
O
m(yy
N
P
m
m
m
N
N
P
m
Ol
W
N
A
Oy]
O
my
O
W
m
M
O
f
N
(
N
m
m
N
O
M
IP
A
0
0
N
Cml
P
b
m
l0
m
m
n
m
N
N
P
P
N
m
m
n
n
A
m
m
m
W
O
m
Of
M
M
O)
m
m
W
Ol
W
Ol
N
z�
m
m
W
W
m
W
m
m
m
m
m
m
m
m
m
m
m
W
m
W
m
W
W
W
W
m
m
n
b
m
n
O
N
m
N
m
M
M
N
W
N
m
m
m
m
m
m
N
m
P
S O
m
O
m
O
m
O
m
O
P
O
O
n
O
O
m
P
M
C
ID
M1
W
OI
OI
N
N
N
N
m
N
P
N
b
N
A
N
m
N
E _
N :..
a
m
�
a
Q
N
M
N
N
A
n
n
N
m
N
O
N
M
N
Q
N
M1
M
P
O
m@
OI
OI
P
O
N
Q
P
P
O
P
P
O
P
P
P
N
N
N
N
m
m
A
A
n
M1
m
m
m
m
m
m
n
�
v
u _
c
Ge o
GG GG
TR
m
m
1
n
b
M
m
t0
N
F
P
m
m
f
n
N
m
A
n
W
N
m
N
m
Oi
O
N
O
Oi
m
p
m
m
m
m
IA
O
M
m
N
@
n
M1
Oi
O
fG
M
lV
n
O
m
V
m
N
W
(pp
N
fV
m
Oi
m
OO
N
N
N
O
m
m
1�
P
Oi
n
p
P
N
N
V6@iiG
H
d`I
W
W;
V
Q
W M
P
N
b
N
n
M M
W
N
m
r O
M
W M
n
N
m
CO
m m
m
r
r m
r
M
M
N
N
OO {V
OO
s'
' �ri
ro
m
m
o
of
ao
n
e
e
e
�+i
�i ni
n
n
of
�.i
a
vi
vi
vi 6
Q
v
01 0
J
O
Q
W M
P
N
b
N
n
M M
W
N
m
r O
M
W M
n
N
m
CO
m m
m
r
r m
r
M
M
N
N
OO {V
OO
s'
a�
01 0
J
O
P M m M N n W M m m N M m N m n N n O W n N O n N b r
O N m P N O P m m m O m O m W m m ^ O m W b
N N m N W m m m N m � N b n m Q m VI N N
N W M n W N O m n M Q b m P OM n n N n M
C m (p m 10 m m n m m W W O O 1 N M M P m m n n m
C N N N N N N N lV N lV NN N M M M M m Co Co M M M6 M
N N N N N N N N N N N N N N N N
W e r n r n r n n n n n n r r r r r n n n n n r n n r r n
W
m n O m W r P N n N N N m m N O N A N P m b b N
Q P W O m N m m N P WI n m m P N n O N N b m
N O W b m e m P N m O m b m N W N N P m W
Co N m m.. m m m m m m m m m m m m m m m m m n m m mm
Vl N N N N N N N m m b N m m N m N M b b b N N N N N VI
P P M t+l n n m O N N 'V
N P N N m N n Oi O (7 W P m lV r p t7 P M fV y
N n n m f O m m n. N m M 01 N r M W Q W f m P
O 0 0 0 N N
W 'J
N W N P M n M M m O N MnCl M Op b Ifl m P b m
M r N O W m O
m m N b n W N W r N N O r b N O m
N M M M M P P b m n M m W O N M P N b e r m W
M C `7 r+ ri rS ei of wi wi �i ci m ri r+ ri Y Y 4 4 v e 6 Y Y? 4 Y Y
3
m m m n m m m m m m m n n n n h P n n n n n n n n n n h
m �. m N m m rti rti rtl tli W N W m n m m m 0 m W W W 0 m m m m rti
D N
z'
n P Q m W m m N m N O n V m P V F W n P Q b P N
C n N n N r N P N N y N m n N V O r Q m O m m
(O m b m Q P M N O m P N O m n n n n m m OI W O W W m
W W W W W W W W W m m m
Z� ro a m m W� ai aG ai ai a6 ai �o ai m m ro ro ai m of ti m m m m vi
6
.l t, S 9 A % S% 6& B B G .S 3 .�. S
m b M m P N m M r M m r y m N m N M O P O N r b Q
m n N N m N n N O n O m W O P b N P m m m m n N N m r
16
m m m n n n n m W O N N Q N m n m W O N N Q b M b
Q � M 16 16
N
_ r
m
a
m
Q
cq
M
y
0
m m
logs
o
Q
r
O N
1.ogW
N
r N
N
o-
E _
�W
O
m Z
m
m
m m
J
O!
a
m
h
c
N
LL
m
N N
a
a
n
m �
o a
z
a
m
6
o c
N
m
a a
O
n
r
O O
m m
r r
V
u _
rr a
�a
Gc o
N
QQ QQ
K
J
a
Z J J J J
O
r
O r
Q
Q
N
O 0
Q
r1
n
0
m
m m
Oi
>v
> J J F' :g W
A O C
T
m
m m
o v a
r
N
r n
o
N
ni
of 6
a
d Y
Y
L;
Om
W W
K
Z
v
v N
a a
c
C a U q
L
y =
M
m m
A
V o aa
m
v`Oi
C
p O q
2
W_
<O
m N
>�> O .Zi
J F 2 Z N U
L
C
0
M
m
o
Q
L
m m
N
N
r N
N
E _
O
O
m Z
Z
J
a
m
h
c
N
LL
m
n m
a
a
n
m �
o a
a
m
N
m
m
O
n
r
O O
m m
r r
m
M
m
L
a
E _
N
a
h
mQ
N
Y
a
a
O
a
m
N
m
m
m
V
u _
Gc o
N
QQ QQ
J
N
Z J J J J
O
r
O r
Q
Q
N
O 0
Q
r1
n
m
rn d
Oi
A O C
T
o v a
CG
C
N
m
a
m
O
h
a
O
V
N
N
m
m
Oi
CG
C
N
c
L
a
m
L
E_ E_ E
?
pE
v i a v 5
m
a Ii1i 15.5
o. a. EL
N
a
°i
a
d v d a v
m
m
m m m o m -m
m r
m ry m e n
i N N m m Q Q M
h a m m N m m m m
a
a • —
m
c
c
0
U
A O (p m r N Q
OU N N N V m C 0
N �^a Vml N N N b
1v
N
N N N
N N N
Z V �
N N m m
�n mmm0
�nAi
jQ" rrnn
0 o m m m m o
m m m m n
a d N m O N m
� vim= m-oi moi ai mcg
�
a E
�
Q
O
C
�
C
a
Vj
C
m
d
p
Link, Liz M (DOA)
From:
Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent:
Monday, November 21, 2016 10:12 AM
To:
AOGCC Reporting (DOA sponsored)
Subject:
PBU L5 -12A / PTD # 216-002
Hello,
Please reference the following well:
Well Name: PBU L5 -12A
Permit #: 216-002
API #: 50-029-21694-01-00
Date of Test: 11/18/16
Type of Test: IPT (Initial Production Test)
Choke Size: 104
Choke Unit:
Production Method: Flowing
Duration (Hours Tested): 8
Top Reference (Top Pert MD): 10856'
Bottom Reference (Bottom Pert MD): 13735'
Tubing Flowing (Pressure): 959
Casing Pressure: 1500
Total Test Rate (O, G, W): 948/42941259
24 -Hour Rate (O, G, W): 2844 / 12881 / 778
Gravity (Oil, API): Not Available
GOR (Gas -Oil Ratio): 4530
This well began Production on
Method of Operations on this date: November 17, 2016
R13DMS ke '" 2 412016
STATE OF ALASKA
j 4LASKA OIL AND GAS CONSERVATION COMMIy N
WELL -OMPLETION OR RECOMPLETION REPOT. i AND LOG
Ia. Well Status: Oil ® Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. mCompletions: One
Development m Exploratory ❑
Service 0 Stretigraphic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Aband.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
8/25/2016
216.002
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
8/9/2016
50-029-21694-01-00 -
4a. Location of Well (Governmental Section):
8. Date TO Reached:
16. Well Name and Number:
8/20/2016
PBU L5.12A
Surface: 1669 FSL, 15' FNA, Sec. 01, TI I N, R15E, UM '
9 Ref Elevations KB 67.35 '
17. Field/Pool(s):
Top of Productive Interval: 1328' FNL, 4536' FNA, Sec 12, T11 N, RISE, UM
GL 20.25 • BF 22.25
PRUDHOE BAY, LISBURNE OIL ,
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 345T FNL, 1109' FWL, Sec. 07, T11N, R16E, UM
1375W/8781'
ADL 028320 & 028338
4b. 41b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. Land Use Permit:
Surface: x- 717446 • y- 5974800 Zone - ASP 4
13914'18762' •
84-62
TPI: x- 722054 y- 5971941 Zone - ASP 4
12. SSSV Depth (MD(TVD):
20 Thickness at Pennarrast MD/TVD:
Total Depth: x- 723970 y- 5969866 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes ® (attached) No ❑
13. Water Depth, if Offshore:
21. Re-dd9Aaleal Tap Wndow
MD/TVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
8940'17221'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs fiat. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ay, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MW3 / GR / RES, Cement Evaluation, MND / GR / RES / NEU / DEN / Micro RES ..
SEP 2 2 2016
23. CASING, LINER AND CEMENTING RECORD
CASING
Wr. PER
FT
GRADE
SETTING DEPTH MD SETTING DEPTH TVD
HOLE SIZE_
CEMENTING RECO
AMOUNT
PULLED
TOP
BOTTOM TOP BOTTOM
20"
91.5#
H-40
49'
128' 49' 128'
30"
18609 Pokset
13-3/8"
72#
K4S 1410
49'
4215' 49' 4008'
17-1/2"
2450 sx AS III, fi00 sx Class'G', 115 sx AS 1
9-5/8"
47#
L40
45'
8940' 45' 7221'
12-1/4"
585 sx Class'G', 300 sx AS 1
7"
26#
L -e0
8752'
10946' 7074' 8740'
8-1/2"
427 sx Class'G', 960 sx Class'G'
4-1/2"
12.6#
1s-5
10777'
13792' 8614' 8778'
6-1/w,
Uncemented Sliding Sleeves w/Swell Packers
24. Open to production or injection? Yes EI No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Tap and Bottom; Perforation
Size and Number):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-1/2" 12.0 13Cr85 10784' 10690'/ 8549'
4-1/2" Sliding Fac Sleeves w/ swell packed
10856' 8673' 13627' 8790'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11082' 8837' 13735' 8783'
Was hydraulic fracturing used during completion? Yes ❑ No 51
Per 20 AAC 25.283 (i)(2) attach electronic and primed
11413' 8964'
11766' 8943'
11927' 8917' COMPLETION
information
12174 8866DATE
12401' 8818' rQ?
12669' 8776' O 25
12828' 8771' �gIFIF�
13076' 8784'
DEPTH INTERVAL (MD) AMOUNT AND [OND OF MATERIAL USED
2200' Freeze Protect w/ 152 Bible Diesel
13339' 8800' L
27. PRODUCTION TEST
Date First Pmdudian: Not on Production
Method of Operation (Flowing, gas IRI, etc)' N/A
Dale of Test:
Hours Tested:
Production for
Oil -Bbl:
Gas�MCF:
Water -BN:
Choke Size:
Gas -Oil Ratio:
Test Period --►
Flow Tubing
Pass
Casing Press: I
Cakulaled
24 Hour Rate �y
Oi4BN:
Gas -MCF:
Winer -Bbl:
Oil GaviN-AN(con):
Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only
RBDMS L ` SEP 1 6 1016
TCA /c./'7./G
28. CORE DATA Conventional Core(s) Yes ❑ No IZ Sidewall Cores Yes ❑ No 0 '
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No ® '
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
10953'
8745'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Colville Mudstone
10074'
8085'
HRZ
10655'
8523'
LISBURNE/WAH006
10953'
8745'
Wahoo 5
10989'
8772'
Wahoo4
11133'
8868'
Wahoo 5 (Invert)
12428'
8812'
HRZ
13796'
8778'
Formation at total depth:
HRZ (From Base)
13796'
8778'
31. List of Attachments: Summary of Daily Drilling Report, LOT / FIT Summary, Survey, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, direclional or indination survey, care analysis, paleontological report, production
or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Sperry, Nathan Email: Nathan.Sperry@bp.com
Printed Name: .toe 424 (2NTitle: Drilling Technologist
Signature: Phone: +1 907 564 4091 Date: 117--411(o
INSTRUCTIONS
General: This forth is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10,404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the lop and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in Item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10407 Revised 11/2015 Submit ORIGINAL Only
118" aw
w �vrc=
ELEV =
'= 2375' 20- CONE), -119,
Argle = 102° (da 1217T 91.5#, H-40,
im MD= 11469' D=
_-____-_.._ _
im ND= 8900'SS
18' CSG, 72#, K-55 BTC/L-80 BTC. D = 12.347' 4206'
Minimum ID = 3.813" @ 2196'
4-1@" OTIS X NIPPLE
4-1/2- TOG, 12.6#, 13CR-86 YAM TOP,
.0152 bpf, D = 3.958'
' LNR 26#, L-80 VAM TOP HC/BTC-M,
)383 bpf, D = 6276'
HES SVfIEEL PACHIRS
NO
SIZE
TOP DEPTH
MN D
11
4-112•
11140'
3.958'
10
4-1/2"
1147V
3.958'
9
4-1/2"
11825'
3.958"
8
4-1/2"
11985'
3.958'
7
4-11T
12233'
3.958"
6
4-12'
12460'
3.958"
5
4-112'
12727'
3.958"
4
4-1/2•
12887'
3.958"
3
4-12'
13134'
3.958"
2
4-12"
13397'
3.958"
1
4-12"
13686'
3.920"
LANDING COLLAHIFBTD, D= 3.920'
Lit" LNR 12.6#, 13CR45 HYD 521,
.0152 bpf, D = 3.958•
L5 -12A SA- I N0TES: WELL ANGLE, 70• @ 11264' •" MAX
DO. S=: 13.4• @ 11232'. CHROME TBG 8 LNR '•'4-12"
LNR HAS 13.5# PJPJTS w /D = 3.920'•'•
GAS LFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORI'
LL4TE
4
4214
4007
46
MMG
OCR
IaCP
-
0824/16
3
6905
5889
49
A?iACi
DAN
RC
0
08/24716
2
8681
7020
41
AL4C•
Ow
R1(
0
08@4!16
1
9465
41
GB-
DMI
BK
0
08124/16
7627
9-5/8' X T WFT TSF5M OR D= 6.19'
MLLOLIT WPDOW (LS -12A) 8940' - 8958'
10667 4-1/2' HES X NP. D = 3.813'
)7'X5 -WET LTPw(11!$K D=4.33'
4112' WLEG,
:):=:3 .951
HMO TT NOT LOGG®_
7'X 5'WFT HGR D=4.2�
5'X4 -1/2'X0. D=3.92'
NO
DEPI1f
SEAT SZ
ACTLIAL SZ
CYC
DATE
13
10856'
NA
3.860'
C
06113/16
12
11087
NA
3.86(1'
C
0823/16
11
1141T
NA
3.860"
C
0823116
10
11766'
NA
3.860"
C
0823116
9
1192T
NA
3.860"
C
0823!16
8
12174'
NA
3.860"
C
0823/16
7
12401'
NA
3.860"
C
08/13/16
6
12669'
NA
3.860"
C
0823+16
5
12828
NA
3.860'
C
0623/16
4
13076'
NA
3.860'
C
0823!16
3
13339
NA
3.860"
C
0823/16
2
1362T
NA
3.86(7'
C
0823/16
•1 1137361
NA I
3.920' I
C 1
0623116
O = OPEN C = CLOSE,
'FRAC PORT SLEEVE 91 = WFD RD TOE SLEEVE
USBLRPE LMT
WE.L L5 -12A
PERMT Nr "1160020
AR N7: 50-029-2169401
i11N RI 5F- 1668' FSL 8 15' FWL
OP BcpWatlon (Alaska)
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths"
North America - ALASKA
- BP
Page 1 of 38
Operation Summary Report
Common Well Name : 15-12
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 7/29/2016 End Date:
8/22/2016
X3 -017W0 -C: (6,616,817.00)
Project: Lisburne
Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud DatelTime: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
UWI. 500292169400
Active datum'. L5 -12A (actual) @67.35usft (above Mean Sea Level)
Date
From -To
Him
(hr)
Task
_
Code
NPT
NPT Depth
oeft)
Phase
Description of Operations
7/29/2016
12:00 18:00
7.00
MOB
P
PRE
BEGIN RON EVENTAT 12:00 WITH PARKER
RIG 272
GENERAL RIG DOWN OPERATIONS ON
DS02-14A
-SECURE TOP DRIVE AND BRIDLE UP
- PERFORM DERRICK INSPECTION
- RIG DOWN RIG FLOOR AND SECURE
FORUM CRANE
- LOWER PIPE SKATE
-MAINTENANCE AROUND RIG: MUDPUMP
#1, CHANGEOUT ANNULAR PREVENTER
PRE
ELEMENT, CHANGEOUT ST -80 HEAD
SKID CATTLE CHUTE AND RIG FLOOR INTO
19:00 - 20:00
1.00
MOB
P
PRE
RIG MOVE POSITION
LOWER MAST
20:00 - 20:30
0.50
MOB
P
- 380 KLBS HOOKLOAD PRIOR TO LANDING
PRE
ON STAND
DISCONNECTELECTRICALINTERCONNECTS.
20:30 - 21:30
1.00
MOB
P
j
MAKE FINAL PREPARATIONS FOR MOVING
RIG -
21:30 - 22:30 1
1.00
MOB P
PRE
PULL OFF D802-14 WITH MUD MOUDLE,
UTILITY MODULEAND DRILL MODULE.
1.50
MOB N WAIT
PRE
STAGE MODULES ON DRILLSITE
WAIT FOR RIG MATS TO BE LAID ON
22:30 - 00:00
DRILLSITE 2 ACCESS ROAD.
1.00
_
MOB N WAIT
- MODULES LINED UP ON DS02
WAIT FOR RIG MATS TO BE LAID ON
7/30/2016
00:00 - 0100
DRILLSITE 2 ACCESS ROAD.
3.00
MOB P
PRE
MODULES LINED UP ON DS02
MOVE RIG FROM DRILLSITE 2 TO MCC
01:00 - 04:00
STAGING AREA
-
8.00
MOB N WAIT
PRE
WAITING ON EAST DOCK ROAD RIG MAT
04:00 - 12:00
PLACEMENT DUE TO POOR SUMMER ROAD
CONDITIONS:
- WAITING AT MCC STAGINGAREA#1 UNTIL
NORDIC FINISHES WELL ON D PAD AND
MOVES TO MCC STAGING AREA#1 FOR
JOINT RIG MOVE.
- SPOT RIG ON MCC STAGING AREA.
MAKEUP UTILITY MOD AND MUD MOD TO
DRILL MODULE.
- SHIM TO LEVEL MODULES ON SOFT
GRAVELPAD
- CHANGE UPPER RAMS TO 7" FIXED.
I
CHANGE LOWER RAMS TO 2-7/8" X 5" VERS.
CHANGE PUMP LINERS TO 5-3/4".
-GENERAL RIG MAINTENANCEAND
HOUSEKEEPING
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths"
North America - ALASKA - BP Page 2 of 38
Operation Summary Report
Common Well Nam: 1.5-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29Q016 End Date: 8/22/2016 X3 -017W0 -C: (6,616,817.00)
Project: Lisburne Site: Lis DS OS
Rig Name/No.: PARKER 272 Spud Date/Time: 1/30/1987 12:00:OOAM Rig Release: 8/25/2016
Rig Contractor PARKER DRILLING CO. UWI: 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
Date
From - To
Him
Task Code NPT NPT Depth Phase Description of Operations
(hr)
_ (usft) _ _ _
MOB N WAIT PRE WAITING ON EAST DOCK ROAD RIG MAT
! 12:00 - 00:00 12.00
PLACEMENT DUE TO POOR SUMMER ROAD
CONDITIONS:
- WAITINGAT MCC STAGINGAREA#1 UNTIL
NORDIC FINISHES WELL ON D PADAND
MOVES TO MCC STAGING AREA #1 FOR
JOINT RIG MOVE.
-GENERAL RIG MAINTENANCE AND
HOUSEKEEPING
- CHANGEOUT MUD MODULE BOOSTER
TRUNION
-COMPLETE WELDING REPAIRS ON MUD
PALLET ELEVATOR (WITH APPROVAL OF MCC
AREAAUTHORITY)
7/31/2016
00:00 - 12:00 12.00
MOB
N IT
PRE WAITING ON EAST DOCK ROAD RIG MAT
PLACEMENT DUE TO POOR SUMMER ROAD
CONDITIONS:
I -WAITING AT MCC STAGING AREA#1 UNTIL
NORDIC FINISHES WELL ON D PAD AND
MOVES TO MCC STAGING AREA#1 FOR
JOINT RIG MOVE.
- GENERAL RIG MAINTENANCE AND
HOUSEKEEPING
-INSTALL NEW FIRE -RATED
QUICK -CONNECTS ON BOP STACK FITTINGS
NOTES FOR RIG MOVE TO L5:
- PRE-CUT DUNNAGE IS STAGED ALONG THE
L5 ROAD, READILY AVAILABLE SHOULD P272
I OR NORDIC 2 PUNCH THROUGH A RIG MATAT
SOFT SPOT IN ROAD.
- D-10 DOZER IS STAGED AT L5 AS
CONTINGENCY IN CASE A MODULE GETS
STUCK IN ROAD
- PARKER HAS PLACED A SPARE TIRE ON L5
PAD
12:00 - 00:00. 12.00
MOB
N WAIT
PRE WAITING ON FAST DOCK ROAD RIG MAT
PLACEMENT DUE TO POOR SUMMER ROAD
CONDITIONS:
-WAITING AT MCC STAGING AREA#1 UNTIL
NORDIC FINISHES WELL ON D PAD AND
MOVES TO MCC STAGING AREA#1 FOR
JOINT RIG MOVE.
- GENERAL RIG MAINTENANCE AND
HOUSEKEEPING
Printed 9/6/2016 1:12:37PM *All depths reported in Drillers Depths'
Common Well Name: 1-5-12
Event Type: RE-ENTER- ONSHORE(RON)
North America - ALASKA - BP Page 3 of 38
Operation Summary Report
Start Date: 7/2 912 01 6
End Date: 8/22/2016
AFE No
X3-017WQ-C:(6,616,817,00)
Project Lisburne I Site: Lis DS 05
Rig Name/No.: PARKER 272 Spud Date/rime: 1/30/1987 12:00:00AM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. _ UWII 500292169400
Date I From - To
21'.00 - 00'.00
Him
Sea Lei
Task Code NPT NPT Depth
(usft)
MOB N WAIT
3.00 MOB N SFAL
Phase Description of Operations
PRE WAITING ON EAST DOCK ROAD RIG MAT
PLACEMENT DUE TO POOR SUMMER ROAD
CONDITIONS:
- WAITINGAT MCC STAGING AREA UNTIL
NORDIC FINISHES WELL ON D PADAND
MOVES TOWARDS MCC STAGING AREA #1
FOR JOINT RIG MOVE.
-01:00: LIFT MODULES, SEPARATE AND
TURN TO PREP FOR MOVE TO STAGING AREA
#2 AT G&I.
-ABLE TO MOVE MUD MODULE AND
LINEUP AT MCC STAGING PAD ENTRANCE.
- DRILL MODULE (3.7 MILLION LBS) HAS
SUNK INTO SOFT GRAVEL STAGING PAD
AFTER 2 DAYS OF WAITING. RIG TEAM
SPENDS -12 HOURS GETTING THE DRILL
MODULE OUT OF ITS TIRE RUTS AND UP
ONTO SOLID MAT SURFACE.
- 18:45: PLANNED START OF P272 RIG
MOVE FROM MCC STAGING PAD TO G&I
STAGING AREA- MUD MODULE MOVES FROM
STAGING PAD UP ONTO EAST DOCK ROAD.
DRILL MODULE DRIVES OFF OF RIG MATS AT
SAME LOCATION AS MUD MODULEAND
I SINKS INTO SOFT GRAVEL PAD
IMMEDIATELY. DRILL MODULE BECOMES
STUCK.
- 18:45 TO 21:00: ATTEMPT TO EXTRACT
DRILL MODULE DURING NON-CRITICAL PATH
TIME WHILE NORDIC 2 MOVES FROM D PAD
TO MCC STAGING AREA. P272 REQUESTS
NORDIC 2 TO MOVE TO PAD 10 AND THEN
PRE EXTRACT STUCK DRILL MODULE FROM MCC
STAGING AREA.
- MUD MODULE IS SITTING ON EAST DOCK
ROAD AND UTILITY MODULE IS SITTING ON
RIG MATS ON MCC STAGING PAD
- NORDIC 2 RIG IS WAITING AT PAD 10 AND
READY TO MOVE TO G&I STAGING AREA #2
AS PART OF JOINT RIG MOVE OUT L5
ACCESS ROAD. EXTRACTION NOW TAKING
PLACE DURING CRITICAL PATH OF RIG MOVE
TO L5.
- DRILL MODULE UNABLE TO MOVE UP
SLIGHT INCLINE FROM MCC STAGING AREA
ONTO EAST DOCK ROAD WITHOUT
BREAKING THROUGH SOFT GRAVEL PAD.
- CALLOUT (2) PEAK D8 CATERPILLAR
DOZERS FOR ASSISTANCE WITH PULLING
RIG UP INCLINE AND OUT OF RUTS.
- RIG TEAM WORKING ITERATIVE PROCESS
OF JACKING UP RIG AND ADDING LAYERS OF
CRIBBING TO BUILD SOLID FOUNDATION FOR
RIG TIRES TO PUSH ON.
- RIG EXTRACTED FROM PRIMARY TIRE RUTS
AT MIDNIGHT, NEED TO CLEANUP DUNNAGE,
BUILDUP/SMOOTH GRAVEL PADAND
REPLACE DAMAGED RIG MATS BEFORE
MOVING DRILL MODULE UP TO EAST DOCK
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP Page 4 of 38
Operation Summary Report
Common Well Name: L5-12
THREE P272 MODULES WITH NORDIC 2 AND
_
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 7/29/2016
End Date: 8/22/2016
X3-017WO-C: (6,616,817,00)
Project: Lisburne
ON EAST DOCK ROAD TO STAGING AREA #2
Site. Lis DS 05
AT G&I TURNOFF.
Rig Name/No.: PARKER 272
pud
SDate/Time: 1/30/1987 12:00
OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
UP TOWARDS EAST DOCK
UWI: 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
(ALLAVAILABLE ON SLOPE).
PRE
Date From - To 1 Him
Task Code NPT
NPT Depth Phase
Description of Operations
CONDITIONS:
-WAITING AT G&I TURNOFF (STAGING AREA
82/2018
00:00 - 02:30 2.50
1 MOB N SFAL
PRE
EXTRACT STUCK DRILL MODULE FROM MCC
HOUSEKEEPING
PRE
WAITING ON EAST DOCK ROAD RIG MAT
PLACEMENT DUE TO POOR SUMMER ROAD
STAGING AREA.
CONDITIONS:
-WAITINGAT G&I TURNOFF (STAGING AREA
#2) WITH NORDIC 2 WHILE RIG MATSARE
MUD MODULE IS SITTING ON EAST DOCK
- GENERAL RIG MAINTENANCE AND
ROAD AND UTILITY MODULE IS SITTING ON
PRE
MOVE MUD MODULE, DRILL MODULE AND
RIG MATS ON MCC STAGING PAD
TURNOFF ON EAST DOCK ROAD TO STAGING
- NORDIC 2 RIG IS WAITING AT PAD IO AND
- RIG MATS LAID ON ENTIRE ROADWAY FROM
G&I TURNOFF TO EAST DOCK.
READY TO MOVE TO G&I STAGING AREA #2
- STAGING AREA IS TO ALLOW FOR RIGS
MATS TO BE SHUFFLED FROM EAST DOCK
AS PART OF JOINT RIG MOVE OUT L5
ACCESS ROAD.
-PICKUP DUNNAGE, FILL-IN GRAVEL RUTS,
LAY NEW RIG MATS.
-WITH NEW SOLID MATTING BOARD
SURFACE, ABLE TO MOVE DRILL MODULE UP
INCLINE FROM MCC STAGING PAD TO EAST
DOCK ROAD WITHASSISTANCE FROM (2) D8
CATERPILLAR DOZERS.
02'.30 - 0330 1.00 MOB P PRE MOVE UTILITY MODULE UP TO EAST DOCK
r ROAD FROM MCC STAGING PAD. LINES UP
0330 - 08:00 4.50 MOB P
0800 - 0000 16.00
8/3/2016 00:00 - 02:30
02:30 - 04:30
2.50
2.00
MOB P
I
MOB P
MOB P
Printed 9/6/2016 1:12:37PM 'AII depths reported in Drillers Depths'
THREE P272 MODULES WITH NORDIC 2 AND
_
PREPARE TO MOVE.
PRE
MOVE MUD MODULE, DRILL MODULEAND
UTILITY MODULE+ NORDIC 2 RIG FROM MCC
ON EAST DOCK ROAD TO STAGING AREA #2
AT G&I TURNOFF.
'- RIG MATS LAID ON ENTIRE ROADWAY FROM
PBOC TO G&I TURNOFF.
STAGING AREA IS TO ALLOW FOR RIGS
MATS TO BE SHUFFLED FROM PBOC AREA
UP TOWARDS EAST DOCK
- 2200 RIG MATS RENTED FOR RIG MOVE
(ALLAVAILABLE ON SLOPE).
PRE
WAITING ON EAST DOCK ROAD RIG MAT
PLACEMENT DUE TO POOR SUMMER ROAD
CONDITIONS:
-WAITING AT G&I TURNOFF (STAGING AREA
#2) WITH NORDIC 2 WHILE RIG MATS ARE
PLACED
- GENERAL RIG MAINTENANCE AND
HOUSEKEEPING
PRE
WAITING ON EAST DOCK ROAD RIG MAT
PLACEMENT DUE TO POOR SUMMER ROAD
CONDITIONS:
-WAITINGAT G&I TURNOFF (STAGING AREA
#2) WITH NORDIC 2 WHILE RIG MATSARE
PLACED
- GENERAL RIG MAINTENANCE AND
HOUSEKEEPING
PRE
MOVE MUD MODULE, DRILL MODULE AND
UTILITY MODULE + NORDIC 2 RIG FROM G&I
TURNOFF ON EAST DOCK ROAD TO STAGING
AREA #3 AT EAST DOCK
- RIG MATS LAID ON ENTIRE ROADWAY FROM
G&I TURNOFF TO EAST DOCK.
- STAGING AREA IS TO ALLOW FOR RIGS
MATS TO BE SHUFFLED FROM EAST DOCK
TO L5.
Printed 9/6/2016 1:12:37PM 'AII depths reported in Drillers Depths'
Printed 9/6/2016 1:12:37PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP
Page 5 of 38
Operation Summary Report
Common Well Name: L5-12
AFE Na
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/292016 End Date: 8/22/2016
X3-017WQ-C: (6,616,817.00)
Project: Lisburne
Site: Lis DIS05
Rig Name/No.: PARKER 272
eteR
Spud Dme: 1/30/1987 12:00:00AM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
UWI: 500292169400
Active datum: L5-12A (actual) @67.35usR (above Mean Sea Level)
Date From - To
Him Task
I Code NPT
NPT DepM Phase
Description of Operations
04.30 -- 00:00
(hr)
MOB
P
PRE
WAITING ON _51 NIAKUKACCESS ROAD RIG
MAT PLACEMENT DUE TO POOR SUMMER
ROAD CONDITIONS:
- WAITING AT EAST DOCK (STAGING AREA #3)
'.,
WITH NORDIC 2 WHILE RIG MATS ARE
PLACED
-GENERAL RIG MAINTENANCEAND
HOUSEKEEPING
8/4/2016 00:00 - 03:00
3.00 MOB P PRE
WAITING ON L5/ NIAKUK ACCESS ROAD RIG
MAT PLACEMENT DUE TO POOR SUMMER
ROAD CONDITIONS:
- WAITING AT EAST DOCK (STAGING AREA #3)
WITH NORDIC 2 WHILE RIG MATS ARE
PLACED
- GENERAL RIG MAINTENANCE AND
I
HOUSEKEEPING
0300 - 0530
2.50 MOB P PRE
MOVE MUD MODULE, DRI LL MODULE AND
UTILITY MODULE + NORDIC 2 RIG FROM
EAST DOCK DOWN THE L5 / NIAKUK ACCESS
RD TO L5
- RIG MATS LAID ON ENTIRE ROADWAY FROM
- _ _ _
EAST DOCK TO L5.
05:30 - 0800
2.50 MOB P PRE
SPOT DRILL MODULE OVER WELL CENTER.
MARRY UP UTILITY MODULE AND MUD
MODULE TO DRILL MODULE AND SHIM UP ALL
MODULES.
08:00 - 10:00
2.00 MOB P PRE
RIG UPALL MODULES.
HOOK UP INTERCONNECTS AND INSTALL
10:00 - 11:30
1.50 MOB P I� PRE
WALKWAYS AND TRANSITIONS BETWEEN
MODULES. _
RAISE MAST AND SKID RIG FLOOR TO DRILL
POSITION
- MAST OFF RACKAT 540K LBS
- RAISE PIPE CAT
- INSTALL ROOFTOP WALKWAYS _
11:30 - 15:304.00
MOB P PRE
RIG UP RIG FLOOR EQUIPMENT
- CONNECT MUD, BLEEDER AND CEMENT
LINES
- HANG RIG TONGS, INSTALL MOUSE HOLES
AND TIGHTEN KELLY HOSE
- FUNCTION TEST EMERGENCY SHUT DOWN
- BRIDAL DOWN AND HANG LINES IN
DERRICKAND SECURE
- PERFORM DERRICK INSPECTION
_
- CALIBRATE BLOCKS
15:30 - 18:00
2.50 MOB P PRE
TAKE ON 8.5 PPG SEAWATER TO PITS AND
CALIBRATE SENSORS
RIG UP HARD LINEAND VALVES TO FLOW
BACK TANK FOR CIRCULATING OUT DIESEL
FREEZE PROTECT
SERVICE TOP DRIVE AND RIG FLOOR
-_
EQUIPMENT
18.00 - 1830
0.50 RIGU_-I P PRE
ACCEPT RIGAT 18: 00 HRSAND HOLD PRE
SPUD MEETING WITH RIG CREW_
18:30 - 1930
1.00 RI P PRE CONTINUE TAKING ON HEATED SEAWATER
IN
PITS
LOAD AND STRAP DRILL PIPE IN PIPE SHED
19:30 -- 20:00
_
0.50 RIGU I P PRE RIG EVACUATION DRILLAND AAR. ALL
PARTIES EVACUATED RIG AND MUSTER AT
THE
DESIGNATED POINT. TIME FOR
EVACUATION DRILL- 5 MIN.
Printed 9/6/2016 1:12:37PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP Page 6 of 38
Operation Summary Report
Common Well Name: L5-12 AFE No
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 729/2016 End Date: 8/22/2016 X3-017WQ-C:(6,616,817.00)
Project: Lisburne Site Lis DS OS .i
Rig Name/No.: PARKER 272
Spud Date(Time: 1/30/1967 12:00 OOAM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO, UWI: 500292169400
Active datum: 1-5-12A (actual) @67.35usft (above Mean Sea Level)
Date
From - To Hrs Task Code NPT NPT Depth Phase Description of Operators
(hr) _ _ (usft)
20:00 --22 :00200 DHB P PRE ATTEMPT TO PULL BPV THROUGH TREE
- RIG UP AND TEST DSM LUBRICATOR,
250/3500 PSI FOR 5 MIN EACH.
-ATTEMPT TO ENGAGEAND PULL BPV
- UNABLE TO GET RETRIEVAL TOOL DOWN
FAR ENOUGH TO ENGAGE BPV
- BREAKAT QUICK TEST SUBAND SUCK OUT
TREE TO VERIFY NO OBSTRUCTIONS
- INSTALL LUBRICATOR AND RE -TEST QUICK
TEST SUB 250/3500 PSI FOR 5 MIN
ATTEMPT TO ENGAGE AND PULL BPV ONE
MORE TIME
- PULL LUBRICATOR AND EXAMINE TREE AND
LUBRICATOR
22:00 - 00:00
2.00 DHB N
FAL
S.7_5
-1
DRILL SITE MAINTENANCE
REPRESENTATIVES DETERMINED THAT OD
ON CROSS-OVER FOR RETRIEVAL TOOL IS
SLIGHTLY OVERSIZE AND WON'T GO
THROUGH SWAB VALVE. COULD NOT BREAK
OFF THE CROSS OVER ON THE LUBRICATOR
ON THE RIG FLOOR.
LAY DOWN LUBRICATOR AND WAIT FOR DSM
TO MOBILIZE THE SAME LUBRICATORAND
'CROSS OVER THAT WAS USED TO SET PLUG
8/52016
00:00 - 01:30
1.50
DHB
NSFAL
-1.75
PRE
NIPPLE UP NEW LUBRICATOR ON TREE AND
TEST TO 250/32500 PSI FOR 5 MIN EACH
- ENGAGE BPV WITH RETRIEVAL TOOL AND
PULL.
- STAND BACK LUBRICATOR AND BPV ON RIG
FLOOR.
01:30 - 03:30
i 2.00 PULL P -1.75 DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT
- VERIFY CIRCULATING LINE UP
- PRESSURE TEST SURFACE LINES AND
EQUIPMENTTO 1700 PSI AND VERIFY LEAK
TIGHT.
'- PUMP 16 BBL DOWN IA, TAKING DIESEL
RETURNS FROM TUBING TO FLOW BACK
TANK
- 3 BPM, 800 PSI
'- PUMP 170 BBLS DOWN TUBING, TAKING
DIESEL RETURNS FROM IA TO FLOW BACK
TANK
- 5 BPM, 1700 PSI
- VERIFY BBL IN/ BBL OUT BY STRAPPING
FLOW BACK TANK EVERY 20 BBL
- SENT DIESEL TO FLOW 1 FOR
HYDROCARBON RECYCLE
- SHUT DOWN AND MONITOR WELL FOR 15
MIN; STATIC
- BLOW DOWN LINES
03:30 - 04:30
1.00
DHB
P
-1.75
DECOMP NIPPLE UP AND TEST DSM LUBRICATOR
250/3500 PSI FOR 5 MIN EACH
- INSTALL BPV AND RIG DOWN LUBRICATOR.
Printed 9/6/2016 1:12:37PM •All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 7 of 38
Common Well Name: 1-5-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/292016 End Date: 8/22/2016 X3-017WQ-C: (6,616,817.00 )
Project: Lisbume - SLite: Lis DS 05
Rig Name/No.: PARKER 272
I Spud Date/Time: 1/30/1987 12:00:OOAM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. _ UWI: 500292169400
_
_Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
Date From - To
Hm Task I Code I NPT - NPT Depth Phase Description of Operations
(h6 Nsft)
04:30 - 06:00
_ _
1.50 DHB N SFAL -1.75 DECOMP ATTEMPT TO PRESSURE TEST BPV FROM
�� �I
BELOW THROUGH IA TO 250/3500 PSI FOR 5
MIN EACH
- GOOD LOW PRESSURE TEST
- DURING HIGH PRESSURE TEST, BPV
FAILED.
- SEAWATER OBSERVED MISTING OUT OF
LUBRICATOR TEST PORT IN WELL HOUSE
CAMERA
-BLEED OFF PRESSURE AND ASSESS
'.. SITUATION
- NOTIFIED 5700 AND WOS, JAY MURPHY, OF
SITUATION
• - 2 GAL SEAWATER IN CONTAINMENTAND 0.5
GAL MISTED OVER CELLAR WALLS
- CLEAN UP CELLAR AND INITIATED
TRACTION REPORT 2016 -IR -5315339
DSM PULLED BPV WITH LUBRICATOR.
INSPECTED BPVAND DETERMINED THAT
THE SEAL FAILED
DSM REBUILT BPV ON SITE
., INSTALLED REBUILT BPV WITH DSM
_
LUBRICATOR
06:00 - 0630
0.50 DHB P -1.75 DECOMP PRESSURE TEST BPV FROM BELOW
THROUGH IA TO 250/3500 PSI FOR 5 MIN
EACH
-GOOD TEST
- BLOW DOWN AND RIG DOWN TEST
__L_ EQUIPMENT
06 - 10:00
3.50 WHSUR P -175 DECOMP NIPPLE DOWN TREE AND ADAPTER FLANGE
-VERIFY NO PRESSURE ON TUBING AND IA
I- FMC REPRESENTATIVE BLEED OFF
HANGER VOID
- NIPPLE DOWN TREEANDADAPTER FLANGE
- INSPECT HANGER THREADSAND REPAIR
BURR ON THREADS
- MAKE UP XO TO HANGER -5 TURNS TO
MAKE UP
- INSTALL BLANKING PLUG ON BPV PER FMC
REPRESENTATIVE -8 TURNS TO MAKE UP
10:00 - 15:00
__
5.00 BOPSUR P -175 DECOMP NIPPLE UP HIGH PRESSURE RISERS AND
BORE STACK
- INSTALL TURNBUCKLES ON STACK
- INSTALL LOW PRESSURE RISER ON TOP OF
BOP STACK
- AIR UP AIR BOOTS ON LOW PRESSURE
RISER
- ENERGIZE ACCUMULATOR AND TAKE RKB
,MEASUREMENTS
15:00 - 16:30
_
1.50 BOPSUR P -1.75 DECOMP RIG UP TO TEST BOPE
- MAKE UP TEST JOINTS
- FILL STACK AND LINES WITH WATER
PURGEAIR FROM SYSTEM
16'.30 - 18'.00
1.50 BOPSUR P -1.75 DECOMP PERFORM SHELL TEST 250/3500 PSI FOR
MIN EACH
- FLANGE LEAKING ON HIGH PRESSURE
RISER
- RE -TORQUE STUDS ON FLANGE
- RETEST - NO LEAKS
NOTIFYAOGCC REPRESENTATIVE JEFF
JONES OF SUCCESSFUL SHELLTEST
Pnoted 9/62016 1 12 37P *All depths reported in Drillers Depths*
Printed 9/8/2016 1:12:37PM 'All depths reported in Drillers Depths'
North Arnenca - ALASKA - BP
Page 8 of 38
Operation Summary Report
Common Well Name: L5-12
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 7/29/2016 End Date: 8/22/2016
X3-017WQ-C: (6,616,817.00)
Project: Lisburne
,Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud Date/Time: 1/30/1987 12:00:00AM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
j UWI: 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
DateFrom-To
Him
Task Code NPT NPT Depth
Phase Description of Operations
(hr)
(usft).
18:00 - 19:00 1.00
BOPSUR P 1.75 DEC1
E EQUIPMENT
�—
WHILE WAITING FOR
WHILE WAITING FOR
—
19:00 - 00:00 5.00
BOPSUR P -1.75 DECOMP
REPRESENTATIVE TO ARRIVE ON SITE
TEST ROPE TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 CHARTED MINUTES EACH
I- TEST WITH 7", 4" AND 2-7/8" TEST JOINTS
- TESTED ALLALARMS, PVTAND FLOW
SHOW
- FUNCTION BOPE FROM BOTH REMOTE
-
PANELS
- PERFORM DRAWDOWN TEST
ALL TESTS WITNESSED BY WSL,
TOOLPUSHER AND AOGCC
REPRESENTATIVE,. JEFF JONES
8/6/2016 0000 - 0330 3.50
BOPSUR P DECOMP
CONTINUE TESTING BOPE TO 250 PSI LOW,
3500 PSI HIGH FOR 5 CHARTED MINUTES
EACH
- FINISH TEST WITH 4" TEST JOINT
�-
CHOKE MANIFOLD VALVE#10 FAILED
- REBUILD AND RE -TEST VALVE #10
- BLOW DOWN AND RIG DOWN TEST
EQUIPMENT
1
- SEE ATTACHED TEST CHARTS
PERFORM H2S / RIG EVACUATION DRILLAND
AAR_ ALL PERSONNEL RESPONDED
APPROPRIATELY AND MUSTER AT CORRECT
LOCATION. CREW RESPONSE TIME= 3 MIN
40 SEC.
03:30 - 08:30 3.00
DHB P DECOMP
RIG UP DUTCH RISERAND DSM LUBRICATOR
TO PULL BLANKING PLUG AND BPV
- PRESSURE TEST LUBRICATOR 250/3500 PSI
FOR 5 MIN EACH
- PULL LUBRICATOR AND DUTCH RISER
ASSEMBLY
- ENGAGE BLANKING PLUG AND PULL FROM
WELLHEAD
1
- RE -INSTALL DUTCH RISER AND
LUBRICATOR ASSEMBLY
- PULL BEV PER DSM CREW
- RIG DOWN LUBRICATORAND DITCH RISER
_
ASSEMBLY
06:30 - 08:00 1.50
PULL P I,, DECOMP
RIG UP TO PULL 2-7/8" TUBING WITH
CONTROL LINE
- RIG UP DOYON CASING
RIG UP SCHLUMBERGER SPOOLING UNIT
108:00 - 09:30 1.50
PULL P DECOMP
ENGAGE HANGER WITH LANDING JOINTAND
1
PULL
- MAKE UP 5 TURNS WITH LANDING JOINT
INTO HANGER PER FMC
- PULL HANGER FREE WITH 90K AND PULL TO
FLOOR
- MONITOR WELL FOR 10 MIN - STATIC
- LAY DOWN HANGER AND LANDING JOINT
09'.30 - 12:00 250
PULL P DECOMP
CIRCULATEA 60 BBL BARAKLEAN PILL
SURFACE TO SURFACE
- 6.5 BPM; 1935 PSI
- MONITOR WELL FOR 10 MIN - STATIC
Printed 9/8/2016 1:12:37PM 'All depths reported in Drillers Depths'
Printed 9/6/2016 1:12:37PM •AII depths reported in Drillers Depths"
North America -ALASKA - BP
Page 9 of 38
Operation Summary Report
Common Well Name: L512
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/28/2016
End Date: 8/22/2016
X3-017WQ-C: (6,616,817.00)
Project: Lisburne
Site: Lis DS OS
-
Rig Name/No.: PARKER 272
Spud Date/Time: 1/30/1987
12:00 OOAM
Rig Release: 8/25/2016
Rig Contractor PARKER DRILLING CO.
! UWI: 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
Date
From- To
Him Task Code NPT
NPT Depth Phase
Description of Operations
12:00 - 22:00
(hr)
10.00 PULL P
(usft) _.
DECOMP
PULLAND LAY DOWN 2-7/8", 6.SNFT, EUE 8RD
IPC TUBING FROM 9057' MD
- PU 81 K, SO 77K AT 9030' MD
- MONITOR DISPLACEMENT WITH TRIP TANK
WHILE LAYING DOWN TUBING
-RECOVERED:
76 STAINLESS STEEL BANDS
283 FULL JOINTS OF 2-7/8" TUBING
4 GAS LIFT MANDRELS
1 SUBSURFACE SAFETY VALVE
1 CUTOFF JOINT 2.5' LONG.
ALL ITEMS PULLED FROM WELL CHECKED
22:00 - 22:30
_-1
0.50 111 PULL P
DECO AP
FOR NORMAND WITHIN LIMITS.
RIG DOWN DOYON CASING EQUIPMENT
2230 - 2300
0.50
PULL
P
__
DECOMP
SERVICETOP DRIVEAND RIG FLOOR
EQUIPMENT
23:00 - 23:30
0.50
P
DECOMP
_
CLEAN AND CLEAR RIG FLOOR
23:30 - 00:00
0.50
P
WEXIT
RIG UP E -LINE
8/7/2016
I WEXIT
CONTINUE TO RIG UP SCHLUMBERGER
00:00 - 01:00
1.00
4EVALP
P
I
E -LINE
01:00 - 04:00
3.00
WEXIT
_
RUN IN THE HOLE WITH 8.5" GAUGE RING TO
DRIFT 9-5/8" CASING FOR RUNNING EZSV ON
SLB E -LINE
- RUN IN THE HOLEAND TAG TOP OF TUBING
STUB
- PULLOUT OF THE HOLE WITH E-LINEAND
LAY DOWN GAUGE RING
:.
SIMOPS: BUILD STANDS OF 4" DRILL PIPE
I
OFFLINE
_
04:00 - 08:001
_
4.00 EVAL P
WEXIT
MAKE UPAND RUN IN THE HOLE WITH 9-5/8"
EZSV (7.75" MAX OD) AND GR/CCL ON SLB
E -LINE
-LOG WELL
-CONFIRM WITH WELLSITE GEO AND WSL
AND SET EZSV AT 8964' WLMD
SIMOPS: BUILD STANDS OF 4" DRILL PIPE
'.
08:00 - 08:00
1.00 EVAL P ',
�, WEXIT
OFFLINE
RIG DOWN SCHLUMBERGER E -LINE AND
CLEAR RIG FLOOR.
Printed 9/6/2016 1:12:37PM •AII depths reported in Drillers Depths"
Pnnted 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths`
North America - ALASKA - BP
Page 10 of 38
Operation Summary Report
Comnwn Well Name: _5-12
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Date: 7/29/2016 End Date: 8/22/2016
X3-017WQ-C.(6,616,81L00)
IStart
Project: Lisburne
j Site: Lis DS 05
Rig Name/Ni PARKER 272
Spud DateTme: 1/30/1987 12:00 00AM
Rig Release: 825/2016
Rig Contractor: PARKER DRILLING CO.
UWI' 500292169400
Active datum: L5 -12A (actual) @67.35usR (above
Mean Sea Level)
Dat: From -To Hm
Task Code NPT NPDepthPhase
Depth T
Description of Operations
(
-
09:00 - 10:00 1.00
DHB P WEXIT
PRESSURE TEST 9-5/8" CASING AND EZSV
SETAT8964'WLMD
- REVIEW PRESSURE TEST CROSS CHECK
1
CHECKLIST
- 250 PSI LOW FOR 5 CHARTED MIN - GOOD
TEST
- 3500 PSI HIGH FOR 30 CHARTED MINUTES -
GOODTEST
- LOST 12 PSI IN FIRST 15 MIN
- LOST 5 PSI IN SECOND 15 MIN
- PUMPED 9.4 BBLS, BLED BACK 9.4 BELS
- TEST MET BP WELLBORE TESTING
CRITERIA
- DISCUSSED RESULTS WITH WOS AND
f
RECEIVEDATP
- TEST CRITERIA CALCULATOR AND TEST
CHARTATTACHED
SIMOPS: BUILD STANDS OF 4" DRILL PIPE
OFFLINE
10:00 - 12:00 2.00
STWHIP P WEXIT
MOBILIZE SCHLUMBERGER WHIPSTOCKAND
MILLS TO RIG FLOOR.
- LOAD TOOLS IN SHEDAND INSPECT
- REVIEW WHIPSTOCKAND RUNNING
I
PROCEDURE WITH SLB, BAKER
DIRECTIONAL TEAM, AND RIG TEAM.
CHECK LOCK -DOWNS ON TUBING SPOOL
WITH FMC
- DECISION MADE TO PERFORM WELLHEAD
WORK WITH MILLING ASSY HUNG OFF.
12:00 - 15:30 3.50
STWHIP P WEXIT
PICK UPAND RUN IN THE HOLE WITH 9-5/8"
SCHLUMBERGER TRAKMASTER PLUS
_
WHIPSTOCK ASSY TO 655'MO
115:30 - 22:30 7.00
STWHIP P WEXIT
_
RUN IN THE HOLE WITH 9-5/8" WHIPSTOCK
ASSY ON 4" DRILL PIPE
- FROM 655' MD TO 8963' MD
- RUN IN THE HOLE PICKING UP 96 SINGLE
JOINTS OF DRILL PIPE FROM SHED
- CONTINUE RUNNING IN ON STANDS OF 4"
i
DRILL PIPE OUT OF DERRICK
- FILL PIPE EVERY 20 STANDS
- SHALLOW TEST MWD AT 1600'MD-GOOD
TEST
- RUNNING SPEED 90 FPM
- UTILIZE TRIP TO MONITOR DISPLACEMENT
WHILE RUNNING IN THE HOLE
22:30 - 23:00 0.50
STWHIP P WEXIT
_ _
SERVICE TOP DRIVE AN BRIG FLOOR
EQUIPMENT
123:00 - 00:00 1.00
STWHIP P I WEXIT
ORIENT AND SET WHIPSTOCK
I
-ORIENT WHIPSTOCK PER BAKER DD; 46°
LOHS
- SET WHIPSTOCK PER SCHLUMBERGER
REPRESENTATIVES
- TAG EZSVAT 8969'MD WITH 5K DOWN
- PICK UP TOFF EZSV WITH WHIPSTOCK
TO 8966' MD
- SLACK OFF IN 10K INCREMENTS TO 60K
AND OBSERVE WHIPSTOCK SHEAR
- BOTTOM OF WHIPSTOCK SET AT 8966'MD
- BOTTOM OF SLIDE ON WHIPSTOCKAT 8958'
MD
-TOP OF SLIDE ON WHIPSTOCKAT 8944' MD.
Pnnted 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths`
Printed 9/6/2016
1:12:37PM •AII depths reported in Drillers Depths*
North America - ALASKA - SP
Page 11 of 38
Operation Summary Report
Common Well Name: L5-12
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 7/292016 End Date: 8/22/2016
X3 -017W0 -C: (6,616,817.00)
Project: Lisburne
Site: Lis DSM
Rig Name/No.: PARKER 272
Spud DateRme: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor. PARKER DRILLING CO.
UWI: 500292169400
Active datum: 1-5-12A (actual) @67.35usft (above
Mean Sea Level
Dale From - To Him
Task Code NPT NPT Depth Phase
Description of Operations
(hr)
(usft)
8/82016 00:00 - 01:30 1.50
STWHIP P WEXIT
HANG DOFF MILLING ASSEMBLY -PRIOR TO
REPLACING TUBING SPOOLAND PACK -OFF
- PULLAND STAND BACK 2 STANDS OF DRILL
PIPE
- MAKE UP HES HANG OFF TOOL PER HES
REPRESENTATIVE
- RUN IN THE HOLE 1 STAND TO 8850' MD; PU
170K, SO 140K
- SET HANG OFF TOOL PER HES
REPRESENTATIVE
- PULLAND LAY DOWN RUNNING TOOL.
01:30 - 03:30 200
WHSUR P WEXIT
_
NIPPLE DOWN BOPE STACKAND RISERS TO
CHANGE OUT TUBING SPOOLAND PACK -OFF
- DRAIN STACK
- DE -ENERGIZE ACCUMULATOR AND ND
BOPE STACK
- BREAK TUBING SPOOL FROM WELL HEAD
- RACK BACK STACK AND STORE ON STUMP
- PULL HIGH PRESSURE RISERS TO RIG
FLOOR
H2S/ MAN D0WN DRILL: CRT H2S=3 MIN 10
SEC.
0330 - 04:301.00
WHSUR P WEXIT
NIPPLE DOWN TUBING SPOOL
- PULL 9-5/8" CASING PACK -OFF
- CLEAN AND INSPECT CASING SPOOL
04.30 - 0530 1.00
WHSUR P WEXIT
INSTALL 9-5/8" CASING PACK-OFFAND
NIPPLE UP NEW TUBING SPOOL
�-INSTALL NEW 9-5/8" CASING PACK -OFF PER
FMC PROCEDURE
- NIPPLE UP NEW TUBING SPOOL
05'.30 - 0630 1.00
WHSUR P WEXIT
_
PRESSURETEST PACK -OFF SEALSAND
FLANGE
- 250 PSI LOW FOR 5 MIN
- 3500 PSI HIGH FOR 15 MIN
- DISCUSSED RESULTS WITH WOSAND
RECEIVED ATP
- SEE ATTACHED TEST CHART
06.30 - 0830 2.00
WHSUR P WEXIT
_
NIPPLE UP HIGH PRESSURE RISERSAND
BOPE STACK
- INSTALL TURNBUCKLES ON STACK
- INSTALL LOW PRESSURE RISER ON TOP OF
BOP STACK
-AIR UP AIR BOOTS ON LOW PRESSURE
RISER
- ENERGIZE ACCUMULATOR AND TAKE IRKS
MEASUREMENTS_
0830 - 09'30 1.00
WHSUR P WEXIT
MAKE UP HES RUNNING TOOLAND PULL
HANG OFF TOOL
- RUN IN THE HOLE WITH RUNNING TOOL
AND ENGAGE HANG OFF TOOL
-RELEASE HANG OFF TOOL
- PU 170K, SO 140K
- PULLAND LAY DOWN HANG OFF TOOL
0930 - 10.30 1.00
WHSUR P WEXIT
PRESSURE TEST ROPE BREAKS AND NEW
WELL HEAD COMPONENTS 250/3500 PSI FOR
5 CHARTED MIN
-GOOD TEST
- SEE ATTACHED TEST CHART
Printed 9/6/2016
1:12:37PM •AII depths reported in Drillers Depths*
Common Well Name: LS72
Event Type: RE-ENTER- ONSHORE (RON)
North Arnedca - ALASKA - BP
Operation Summary Report
Start Date: 7/29/2016 End Date: 8/22/2016
Site: Lis DS 05
Spud DateRme: 1/30/1987 12:00:00AM
AFE No
K3-017WQ-C: (6,616,817,00)
Page 12 of 38
Rig Contractor. PARKER DRILLING CO. UWL 500292169400
Active datum: L5 -12A (actual) @67.35usfi (above Mean Sea Level)
Date
From - To
Him
Task Cade NPT NPT Depth Phase Description of Operations
(hr)
_ (usft)
10:30 - 12:00
1.50
STWHIP P WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER
_
TO 10.5 PPG 1 -SND MILLING FLUID
CONTINUE TO MILL40' OF RATHOLE FOR
10 BPM; 1750 PSI
S P WEXIT MILL 8-1/2" WINDOW PER SCHLUMBERGER
12:00 - 20:00
8.00
2(
ormnU io UU: UU - UI:UU I.VU 5I WHIP
01:00 - 0300 2.00 STWHIP
Printed 9/6/2016
FISHING REPRESENTATIVE
- TAKE SPR: MIN = 10.5 PPG IN/OUT 8942' MO
(7223' TVD)
- MP#1: 30/40 SPM; 420/525 PSI
- MP#2: 30/40 SPM; 410/525 PSI
- 400 GPM; 1790 PSI ON, 1700 PSI OFF
- 90 RPM; 8K Fr -LBS TORQUE ON, 6K FT -LBS
TORQUE OFF
- 1-5K WOB
TOW: 8940' MD (7221' TVD)
BOW: 8958' MD (7235' TVD)
WORK MILLS THROUGH WINDOW WITH AND
WITHOUT ROTARY AND PUMPS WITH NO
DRAG NOTED
PERFORM D2 WITH HIGH GAS TO PITS DRILL
AND AAR: CRT 90 SEC TO CLOSE IN WELL; 10
1:12:37PM 'All depths reported in Drillers Depths`
MIN FOR ALL PERSONNELTO MUSTER. DO
TO WINDS AND WORK LOCATIONS,
PERSONNEL MUSTERED AT BOTH MUSTER
LOCATIONS. ACCURATE PERSONNEL COUNT
WAS CONFIRMED.
_
--WEXIT
CONTINUE TO MILL40' OF RATHOLE FOR
NEXT RSS ASSEMBLY IN NEW FORMATION
- FROM 8958' MD TO 8998' MD (7267' TVD)
- 400 GPM; 1800 PSI ON, 1720 PSI OFF
- 110 RPM; 9-1 OK FT -LBS TORQUE ON, 8K
TORQUE OFF
- 12-14K WOB
- PU 172K, SO 140K, ROT 152K
PUMP 40 BBL HIGH VIS SWEEP AT 8995'MD.
P
WEXIT
CIRCULATE THE HOLE CLEAN BEFORE
PERFORM LOT
- PULL UP INTO 9-518" CASING ABOVE
WINDOW.
- 500 GPM; 2545 PSI
- MODERATE INCREASE IN RETURNS WITH
SWEEP.
-MW IN/OUT=10.5 PPG
P WEXIT
_
RIG UPAND PERFORM LOT
- MUD WEIGHT: 10.5 PPG, 7221' TVD, 8940' MD
- PUMP 2.8 BBLS TO 620 PSI, BLEED BACK 2.6
BBLS
- LOT EMW = 12.15 PPG
- DISCUSS RESULTS WITH ODEAND RECEIVE
ATP
- MONITOR WELL FOR 10 MIN - STATIC
- SLOWDOWN LINESAND RIG DOWN TEST
EQUIPMENT
1:12:37PM 'All depths reported in Drillers Depths`
North America
- ALASKA - BP
Page 13 of 38
Operation Summary Report
Common Well Name: 1.5.12
AFE No
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/29/2016
End Date: 8/2212016
X3-017WQ-C:(6,616,817.00)
Project: Lisburne Site: Lis DS 05
1
Rig Name/No.: PARKER 272 SDate/Time: 1/30/1987 12:00 OOAM
pud
Rig Release: 8/25/2016
Rig Contractor. PARKER DRILLING CO.
UWI: 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
Date I From - To
Him Task
Code
NPT
NPT Depth
Phase
7�77_7:30
Description of Operations
hr)_(usft)
450 STWHIP P —
WEXIT
PULL OUT OF THE HOLE ON ELEVATORS
WITH WINDOW MILLING ASSY FROM 8900' MD
PU 170K, SO 140K
PULL AT 90 FPM FROM 8900'MD TO 5000'MD
PULLAT 150 FPM FROM 5000'TO SURFACE
MONITOR WELL FOR 10 MIN PRIOR TO
107:30
NONSHEARABLES ACROSS THE
STACK.PULLING
9:30 2.00 STWHIP P
WEXIT
LAY DOWN MILLING BHALAY
DOWN 4" HWDP
LAY DOWN 6-1/2" DRILL COLLARS
MILLS IN GAUGE
CLEAN AND CLEAR RIG FLOOR
0:30 1.00 WHSUR P
WEXIT
RIG UP AND FLUSH BOP STACK
COMPONENTS
FUNCTION ALL OPERATORS
10:30 - 12:00 1.50 DRILL P r
WEXIT
PICKUPAND MAKEUP8-1/2"RSS
INTERMEDIATE DRILLING ASSEMBLY
-8-1/2" HALLIBURTON MM65D BIT
- AUTOTRAK W/ NEAR BIT GAMMA AND
ONTRAK
12:00 - 1430 250 DRILL P
WEXIT
PICKUPANDRUN IN THE HOLEWITH8-1/2"
INTERMEDIATE DRILLING ASSY
-PICKUP 23 SINGLES OF 5" H WDP AND JARS
FROM PIPE SHED
_____t1430 _-PU
77K, S077K
1430 - 19:00 4.50 DRILL P
WEXIT
RUN IN THE HOLE WITH 8-1/2" RSS DRILLING
ASSY FROM 894' MD TO 8943' MD ON
ELEVATORS
- FILL PIPE EVERY 20 STANDS
- SHALLOW HOLE TEST MWD AT 1000' MD -
_ _
IGOODTEST
1900 - 1930 0.50 DRILL P
WEXIT
SERVICE TOP DRIVE AND RIG FLOOR
—__
EQUIPMENT
19:30 - 00:00 4.50 DRILL P
INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE
HOLE FROM 8998' MD TO 9029' MD (7499' TVD)
- 500 GPM; 2750 PSI ON, 2675 PSI OFF
- 140 RPM; 8K TORQUE ON, 6K TORQUE OFF
-5-14K WOB
-
PU 182K, SO 140K, ROT 152K
-
ECD ACTUAL 11.3 PPG
-SURVEY
EVERY 30-60'
-ACTUAL
ROTATE TIME 3.5 HRS
-
NO BACKREAMING AT CONNECTIONS
-
MUD WEIGHT 10.5 PPG IN/OUT
-
SPR; 8943' MD, 7267' TVD
- MPT: 30/40 SPM 500/605 PSI
- MP2: 30/40 SPM 470/585 PSI
Printed 9/6/2016 1:12:37PM *All depths reported in Drillers Depths*
Common Well Name: 1-5-12
Event Type: RE-ENTER- ONSHORE (RON)
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: 1-5-12A (actual) @67.35usft (ab
Date From - To Him
_ (hr)
8/10/2016 00:00 - 12:00 12.0
12:00 - 18:00
I 6.00
North America - ALASKA - BP
Operation Summary Report
Start Date: 7/292016 End Date: 8/22/2016
Site: Lis DS O
Spud DaterTime: 1/30/1987 12:00 OOAM
Mean Sea Level)
Page 14 of 38
AFE No
X3-017WQ-C: (6,616,817.00)
Rig Release: 8/25/2016
UWI: 500292169400
Task Code NPT NPT Depth Phase Description of Operations
I___ (usft)__.
DRILL P INT1 DIRECTIONAL DRILL B-1/2"INTERMEDIATE
HOLE FROM 9029' MD TO 10100' MD (8105'
TVD)
- 1071'IN 12 HRS = 89.3 FPH WITH
CONNECTIONSAND SURVEYS
-INSTANTANEOUS ROP= 110-120 FPH
- 525 GPM; 3390 PSI ON, 3290 PSI OFF
- 140 RPM; 8K TORQUE ON, 5K TORQUE OFF
- 14-17K WOB
- PU 197K, SO 150K, ROT 155K
- NO BACKREAMING AT CONNECTIONS
- MUD WEIGHT 10.5 PPG IN/OUT
- ECD: ACTUAL= 11.6 PPG, CALC = 11.2 PPG
- SURVEY EVERY - 90 FT
- NO LOSSES OVSERVED WHILE DRILLING
I DRILL
1800 - 18'.30 0.50 DRILL
Printed 9/6/2616
PUMPED 35 BBL HIGH -VIS AT:
-9607'MD; 75% INCREASE IN RETURNS
NOTED AT SHAKERS
10100' MD; 50% INCREASE IN RETURNS
NOTED AT SHAKERS
SPR; 9970' MD, 8006' TVD
- MPi: 30/40 SPM 485/605 PSI
- MP2: 30/40 SPM 475/600 PSI
I D2, KICK WHILE DRILLING DRILL
_ PERFORMED. CRT =1:30
P INTI DIRECTIONAL DRILL 8-1/2" INTERMEDIATE
HOLE FROM 10100' MD TO 10450' MD (8369'
TVD)
- 350' IN 6 HRS = 58.3 FPH WITH
CONNECTIONS AND SURVEYS
- INSTANTANEOUS ROP = 90-120 FPH
- 525 GPM; 3070 PSI ON, 3070 PSI OFF
- 140 RPM; BK TORQUE ON, 6KTORQUE OFF
14K WOB
- PU 203K, SO 152K, ROT 164K
- NO BACKREAMING AT CONNECTIONS
- MUD WEIGHT 10.5 PPG IN/OUT
- ECD: ACTUAL= 11.2 PPG, CALC = 11.2 PPG
-SURVEY EVERY -90 FT
- NO LOSSES OVSERVED WHILE DRILLING
SPR; 10350' MD, 8295TVD
- MPi: 30/40 SPM 450/575 PSI
-MP2: 30140 SPM 4501575 PSI
P INTI SERVICE TOP DRIVE AND RIG FLOOR
EQUIPMENT
1 12 37P •AII depths reported in Drillers Depths"
North America - ALASKA - BP Page a of 38
Operation Summary Report
Common Well Name: LS -12
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016 X3-017VVQ-C: (6,616,817.00)
_—---r-.
Project: Lisburne Site. Lis DS 05
Rig Name/No.: PARKER 272 Spud DateRime: 1/30/1987 12:0O:OOAM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. UWP. 500292169400
Active datum: 1.5-12A (actual) @67.35usft (above Mean Sea Level)
Date
From - To Hrs
Task Code NPT NPT Depth Phase
Description of Operations
_ (hr)
_ (usft)
18:30 - 00:00 5.50
DRILL P INTI DIRECTIONALDRILLB-1/2"INTERMEDIATE
HOLE FROM 10450' MO TO 10947' MD (8741'
TVD)
- 49T IN 6 HRS = 82.6 FPH WITH
CONNECTIONS AND SURVEYS
- INSTANTANEOUS ROP = 110-120 FPH
- 525 GPM; 3490 PSI ON, 3490 PSI OFF
- 140 RPM; 9KTORQUE ON, 5K TORQUE OFF
- 12-14K WOB
- PU 212K, SO 152K, ROT 167K
- NO BACKREAMINGAT CONNECTIONS
- MUD WEIGHT 10.5 PPG IN/OUT
- ECD: ACTUAL = 11.4 PPG, CALC = 11.2 PPG
- SURVEY EVERY- 90 FT
- ACTUAL ROTATE TIME =18.2 HRS
- NO LOSSES OVSERVED WHILE DRILLING
PUMPED 35 BBL HIGH-VISAT:
- 10660' MD; 50% INCREASE IN RETURNS
NOTED AT SHAKERS
CONTROL DRILL FROM 1 0900'MD TO
SECTION TD AT 10947' MD (8741' TVD)
- OBSERVE DRILLING BREAK AT 10946' MD
- GEO CALLED SECTION TD AT TOP OF
LISBURNE AT 1094T MD
8/11/2016 00.00 - 01:30 1.50
DRILL N DPRB 10,945.52 INTI CIRCULATE AND CONDITION MUD AT TD;
ENCOUNTER SEVERE LOSSES
-
- MUD WEIGHT IWOUT = 10.6 PPG
- PICK UP OFF BOTTOMAFTER CALLING TD
AND TAKE SPR: 10947' MD (8741' TVD)
- MP1: 30/40 SPM 470/580 PSI
- MP2: 30/40 SPM 460/575 PSI
- PU 210K, SO 160K
- 140 RPM, 7K FT -LBS TORQUE
PICK UP AND BEGIN CIRCULATING WELL
CLEAN AT TD. WELL WENT ON COMPLETE
LOSSES.
- DYNAMIC LOSS RATE 100%
- BEGAN FILLING ON THE BACK SIDE AND
ESTABLISHED STATIC LOSS RATE>350 BPH
- NOTIFY WOSAND ODE OF SITUATION
- PUMP 40 BBL 40 PPB DRILLAHEAD PILLAND
CONTINUE TO KEEP THE HOLE FULL ON THE
BACKSIDE
- DISPLACE LCM PILLAND LET SOAK WHILE
CONTINUING TO KEEP THE HOLE FULL ON
THE BACKSIDE
- ESTABLISH STATIC LOSS RATE: 290 BPH
LINE UP BOTH MUD PLANTS TO BEGIN
BUILDING 10.5 PPG LSND
01.30 - 0200 0.50
_
DRILL P 10,945.52 INTI PUMPOUTOFTHE HOLETOTHETOPOF
THE HRZ
- FROM 1094T MD TO 10600' MD
- PU 220K, SO 160K
- PUMPAT 1 BPM; 60 PSI WHILE CONTINUING
TO KEEP THE HOLE FULL ON THE BACKSIDE
- LOSS RATE 290 BPH
- BUILDING 80 BBLS OF 40 PPB DRILL AHEAD
LCM PILL IN PITS
1:12:37PM 'All depths reported in Drillers Depths`
North America - ALASKA - BP Page 16 of 38
Operation Summary Report
-- — – -
Common Well Name: LS72 AFE No
Event Type: RE -ENTER -ONSHORE (RON) Start Date: 7/292016 End Date: 8/22/2016 X3-017WQ-C'. (6,616,817.00)
Project: Lisburne - Site: Lis DS 05
Rig Name/No.: PARKER 272 Spud Date/Time: 1/30/1987 12:00:00AM Rig Release: 825/2016
Rig Contractor: PARKER DRILLING CO. UWI'. 500292169400
Active datum: 1.5-12A (actual) �wve Mean Sea Level)
Date
From - To Him
Task
Code
NPT NPT Depth
Phase Description of Operations
(hr)
(usft)
_
02:00 - 03:30
1.50
DRILL
N
DPRB
10,945.52
INTI WAIT WHILE BOTH MI AND BARIOD MUD
PLANTS BUILD 10.5 PPG MUD, CONTINUE TO
FILL DOWN THE BACKSIDE TO KEEP THE
HOLE FULL.
- STATIC LOSS RATE DECREASED FROM 290
BPH T020 BPH BY 03: 00
- LOSS RATE CONTINUED TO DECREASE TO
-4 BPH.
03:30 - 07:30 4.00
DRILL P
10,945.52
-
INTI PERFORM WIPER TRIP TO SHOE
- DISCUSS LOSSES AND MUD VOLUME WITH
ODE, DECISION MADE TO PERFORM WIPER
TRIP TO 9-5/8" CASING WINDOW WHILE
WAITING FOR MUD FROM PLANTS
- STATIC LOSS RATE- 4 BPH
PULL ON ELEVATORS FROM 10600' MD TO
9400' MD
- MONITOR DISPLACEMENT W/ TRIP TANK;
LOSS RATE LESS THAN 4 BPH
- PULLED TIGHT (20K OVERPULL) AND WIPED
SEVERAL TIMES FROM 9900' MD TO 9400' MD
- CONTINUED TO PULL INTO CUTTINGS BED
PUMP OUT OF THE HOLE FROM 9400' MD
INTO 9-5/8" CASING WINDOW AT 8947' MD
- PU 180K, SO 140K
300 GPM; 1700 PSI
07'.30 - 1030 3.00
DRILL P 10,945.52
INTI CIRCULATE THE WELL CLEAN, 2 BOTTOMS
UP
- 450 GPM; 2350 PSI
- PUMP 35 BBL HIGH -VIS SWEEP; OBSERVED
25% INCREASE IN RETURNSAT SHAKERS
- MONITOR WELL FOR 10 MIN: STATIC
10:30 - 11:30 1.00
DRILL P 10,945.52
INTI SLIPAND CUT DRILL LINE
- CUT 50' OF DRILL LINE
- CALIBRATE BLOCKS WITH AMPHION, TOTCO
AND BAKER
-CHECK CROWN-O-MATIC
11.30 - 13.00 1.50
DRILL P 10,945.52
INTI RUN IN THE HOLE ON ELEVATORS WITH
8-1/2" DRILLING ASSEMBLY FROM 8851' MD
TO 9880' MD
- 50 FPM RUNNING SPEED
- FILL PIPE EVERY 500' MD, BREAK
CIRCULATION: 5 BPM, 780 PSI FOR 3 MIN
13:00 - 16:30 3.50
DRILL P 10,945.52
W71 WASHAND REAM IN THE HOLE FROM 9880'
MD TO 10946' MD
- FROM 9880'MD T010163'MD
- CIRCULATE 1x BOTTOMS UP
- 500 GPM, 2700 PSI, 80 RPM, 5K TORQUE
- FROM 10352' MD TO 10638' MD
- CIRCULATE ix BOTTOMS UP
- 500 GPM, 2870 PSI, 120 RPM, 6K TORQUE
- FROM 10636 ATTEMPT TO RUN IN THE HOLE
ON ELEVATORS
- ENCOUNTER TIGHT HOLE
- WASH AND REAM THROUGH THE HRZ,
FROM 10415' MD TO 10900' MD
- 500 GPM, 2900 PSI
- 120 RPM, 11KTORQUE
- WASH LAST 46' TO BOTTOM AT 300 GPM
AND 40 RPM
- ESTIMATE i' OF FILL ON BOTTOM
Printed 9/5/2016 1 12 37P 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: L5-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016 X3-017WQ-C: (6,616,817.00)
Project: Lisburne I Site: Lis DS 05
Rig Name/No.: PARKER 272 Spud Date/Time: 1/30/1987 12:00:OOAM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. UWI: 500292169400
Date I From - To I Hrs
L (hr)
16:30 - 20:0 1 3.50
22:30 - 00:00 I 1.50
8/12/2016 100:00 - 02:30 1 2.50
an Sea Level)
Page 17 of 38
Task Code NPT NPT Depth Phase Description of Operations
(Usft)
DRILL P 10,945.52 INTI CIRCULATE HOLE CLEAN, 3.5 x BOTTOMS UP
- PUMP 35 BBL HIGH VIS SWEEP; MINIMAL
INCREASE IN RETURNS AT SHAKERS
- 500 GPM, 2937 PSI
-80 RPM, 6K TORQUE
- WORK FULL STAND KEEPING PIPE 5' OFF
BOTTOM
DRILL P 10,945.52 INTI PULL OUT OF THE HOLE WITH 8-1/2"
DRILLING ASSEMBLY
- MONITOR WELL FOR 10 MIN: STATIC
FROM 10946' MD TO 10603' MD: THRZ
- PUMP AT 1 BPM WHILE PULLING
- PU 204K, SO 143K, AT 10946' MD
FROM THRZ TO 8935' MD ABOVE 9-5/8"
CASING WINDOW
- PULL ON ELEVATORS AT 50 FPM
- PU 184K, SO 130KAT 8935' MD
NO HOLE ISSUES ENCOUNTERED WHILE
_ PULLING OUT OF THE HOLE
DRILL P 10,945.52 INTI PULL OUT OF THE HOLE WITH 8-1/2"
DRILLING ASSEMBLY FROM 8935' MD TO 6200'
MD ON ELEVATORS
-MONITOR WELL FOR 10 MIN: STATIC
r -PUMP DRY JOB
DROP 2.4" HOLLOW DRIFT FOR UPCOMING
_ LINER RUN
DRILL P INT1 CONTINUE TO PULL OUT OF THE HOLE WITH
B-1/2"DRILLING ASSEMBLY
- FROM 8200' MD TO 897' MD ON ELEVATORS
1- MONITOR WELL FOR 10 MIN: STATIC
PU 76K SO 76KAT 897'MD
02:30 - 04:30 200 DRILL P
INTI PULLAND LAY DOWN 8-1/2" RSS DRILLING
ASSEMBLY
-STAND BACK 5"HWDP
- LAY DOWN COLLARS, MWD AND AUTOTRAK
- RECOVERED HOLLOW DRIFT
-DULLBITGRADE: I -I -WT -G -X -I -NO -
TD
CREW HELD WELL CONTROL DRILL WITH
NON-SHEARABLES ACROSS THE STACK CRT
2 MIN
0430 - 05.00 0.50 CASING P
_
INTI CLEAN AND CLEAR RIG FLOOR
0500 - 0600 1 00 CASING P
INT1 RIG UP DOYON CASING TO RUN 7", 26#, L-80
VAMTOP HC LINER
- RIG UP POWER TONGSAND TORQUE -TURN
EQUIPMENT
- MAKE UP SAFETY JOINT
- INSPECTAND RIG UP 7" HANDLING
EQUIPMENT.
Printed 9/6/2016 1:12:37PM `All depths reported in Drillers Depths'
North America -ALASKA - BP Page 18 of 38
Operation Summary Report
Com--
mon Well Name: LS72 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 1 End Date: 8/22/2016 X3-017WQ-C: (6,616,817.00)
I�Sile:
Project: Lisburne Lis DS OS
Rig Name/No.: PARKER 272 Spud Daternme: 1/30/1987 12:00:OOAM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. UWI 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
Date
From - To
Hrs
Task Code NPT NPT Depth Phase Description of Operations
(hr)
(.am
—
06:00 - 10:00
_..
4.00
CASING P INT1 RUN 7', 26#, L-80, VAMTOP HC LINER TO 2154'
MD
- PJSM WITH RIG CREW, DOYON CASING AND
WEATHERFORD LINER REPRESENTATIVE
-CHECK FLOATS
- USE JET LUBE SEAL GUARD
- TORQUE CONNECTIONS 7O 11,950 FT -LBS
j
- CENTRALIZATION: 49 CENTRALIZERS, 51
STOP RINGS
- RUN 1 LOCKED DOWN V FROM PIN ON JT
A
- RUN 1 LOCKED DOWN MID -JT ON JT 8
- RUN FLOATING CENTRALIZERS ON
JOINTS C, 1-43,47-49
- FILL CASING EVERY ON THE FLYAND TOP
OFF EVERY 10 JOINTS
- PU 85K, SO 83K
1000 - 11:00 1.00
CASING
P
INTI MAKE UP WEATHERFORD LINER HANGER /
LINER TOP PACKER ASSEMBLY
MIXAND POUR HI -VIS PILL IN PBR
11:00 - 11:30 0.5�G
P
INT1 CIRCULATE ONE LINER VOLUME (84 BBL)
AFTER PICKING UP LINER HANGER / LINER
TOP PACKER
- 4 BPM, 285 PSI
Printed 916/2016 1:12:37PM *AII depths reported in Drillers Depths'
Common Well Name: LS12
Event Type: RE-ENTER- ONSHORE(RON)
Project: Lisburne
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: L5 -12A (actual) @67.35usR (above
Date From - To His
_ (hr)
11:30 - 00:00 12.50
North America -ALASKA - SP Page 19 of 38
Operation Summary Report
Start Date: 7/29/2016 End Date: 8/22/2016
Site: Lis DS 05
Spud DateRme: 1/30/1987 12:00 OOAM
in Sea Level)
Task Code NPT
CASING P
NPT Depth I Phase
INT1
Panted 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths`
AFE NO
K3 -017W0 -C: (6,616,817.00)
UWI; 500292169400
Description of Operations
RUNT' LINER IN THE HOLE ON ELEVATORS
WITH 5" HWDP AND 4" DRILL PIPE
FROM 2313' MD TO 3000' MD WITH 5" HWDP
FFROM113K, SO 115K
FROM 3000' MD TO 8943' MD RUN IN ON 4"
DRILL PIPE
- FILL PIPE EVERY 10 STANDS
- PU 115K, SO 112K AT 3600' MD
- CIRCULATE 2x BOTTOMS UP AT 9-5/8"
CASING WINDOW
- STAGE UP TO 7 BPM; 900 PSI
CONTINUE TO RUN INTO OPEN HOLE WITH T'
LINER ON 4" DRILL PIPE
FROM 8943' MD TO 10888' MD
- BREAK CIRCULATION EVERY 10 STANDS AT
3 SPM FOR 2 MIN.
- PU 225K, SO 148KAT 10888' MD
- MUD WEIGHT 10.5 PPG IN/OUT
- NO MUD LOSSES WHILE RUNNING IN THE
HOLE
WASH DOWN LAST STAND FROM 10888' MD
TO 10932' MD
- STAGE UP TO CEMENTING RATE IN 1/2 BBL
INCREMENTS TO FINAL CIRCULATING RATE
OF 5 BPM WHILE SLOWLY WASHING DOWN
- @ 2 BPM, 440 PSI, 4% RETURN FLOW
- @ 3 BPM, 515 PSI, 4% RETURN FLOW
- @ 4 BPM, 637 PSI, 5% RETURN FLOW
- @ 5 BPM, 810 PSI, 7% RETURN FLOW
AT 10932' MD, 15' OFF BOTTOM, TOOK 10K
WEIGHT AND PRESSURE INCREASED TO 963
PSI.
REDUCE PUMP RATE AND PICK UP 2' MD
- SLOWLY STAGE PUMPS BACK UP TO 5 BPM,
800-880 PSI
- WORK DOWN AT 10 FPH IN SMALL
INCREMENTS;
- KEEP PRESSURE BELOW 950 PSI AND LET
CLEAN UP BEFORE CONTINUING.
- REDUCE RATE FROM 5 BPM TO 4 BPM
WHILE WORKING DOWN.
- SMALLAMOUNT OF CUTTINGS OVER
SHAKERS AT BOTTOMS UP
- WORK DOWN TO 10940' MO
CONTINUE TO WORK DOWN AT 10 FPH IN
SMALL INCREMENTS FROM 10940' MD TO
10947' MD
- KEEP PRESSURE BELOW 950 PSI AND LET
CLEAN UP BEFORE CONTINUING.
- 4 BPM; 600-900 PSI
- NO LOSSES WHILE WASHING IN THE HOLE
- SMALLAMOUNT OF CUTTINGS OVER
8/13/2016
00:00 - 01:30
1.50
CASING
P
INT1
Panted 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths`
AFE NO
K3 -017W0 -C: (6,616,817.00)
UWI; 500292169400
Description of Operations
RUNT' LINER IN THE HOLE ON ELEVATORS
WITH 5" HWDP AND 4" DRILL PIPE
FROM 2313' MD TO 3000' MD WITH 5" HWDP
FFROM113K, SO 115K
FROM 3000' MD TO 8943' MD RUN IN ON 4"
DRILL PIPE
- FILL PIPE EVERY 10 STANDS
- PU 115K, SO 112K AT 3600' MD
- CIRCULATE 2x BOTTOMS UP AT 9-5/8"
CASING WINDOW
- STAGE UP TO 7 BPM; 900 PSI
CONTINUE TO RUN INTO OPEN HOLE WITH T'
LINER ON 4" DRILL PIPE
FROM 8943' MD TO 10888' MD
- BREAK CIRCULATION EVERY 10 STANDS AT
3 SPM FOR 2 MIN.
- PU 225K, SO 148KAT 10888' MD
- MUD WEIGHT 10.5 PPG IN/OUT
- NO MUD LOSSES WHILE RUNNING IN THE
HOLE
WASH DOWN LAST STAND FROM 10888' MD
TO 10932' MD
- STAGE UP TO CEMENTING RATE IN 1/2 BBL
INCREMENTS TO FINAL CIRCULATING RATE
OF 5 BPM WHILE SLOWLY WASHING DOWN
- @ 2 BPM, 440 PSI, 4% RETURN FLOW
- @ 3 BPM, 515 PSI, 4% RETURN FLOW
- @ 4 BPM, 637 PSI, 5% RETURN FLOW
- @ 5 BPM, 810 PSI, 7% RETURN FLOW
AT 10932' MD, 15' OFF BOTTOM, TOOK 10K
WEIGHT AND PRESSURE INCREASED TO 963
PSI.
REDUCE PUMP RATE AND PICK UP 2' MD
- SLOWLY STAGE PUMPS BACK UP TO 5 BPM,
800-880 PSI
- WORK DOWN AT 10 FPH IN SMALL
INCREMENTS;
- KEEP PRESSURE BELOW 950 PSI AND LET
CLEAN UP BEFORE CONTINUING.
- REDUCE RATE FROM 5 BPM TO 4 BPM
WHILE WORKING DOWN.
- SMALLAMOUNT OF CUTTINGS OVER
SHAKERS AT BOTTOMS UP
- WORK DOWN TO 10940' MO
CONTINUE TO WORK DOWN AT 10 FPH IN
SMALL INCREMENTS FROM 10940' MD TO
10947' MD
- KEEP PRESSURE BELOW 950 PSI AND LET
CLEAN UP BEFORE CONTINUING.
- 4 BPM; 600-900 PSI
- NO LOSSES WHILE WASHING IN THE HOLE
- SMALLAMOUNT OF CUTTINGS OVER
North America - ALASKA - BP Page 20 of 38
Operation Summary Report
Common Well Name: LS72 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 I End Date: 8/22/2016 X3-017WC-C: (6,616,817.00 )
Project: Lisburne Site: Lis DS OS
Rig Name/No.: PARKER 272 Spurt Date/Time: 1/30/1987 12:00.00AM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. UWI: 500292169400
Active datum: 1-5-12A (actual) @67.35usft (above Mean Sea Level)
Date From - To
Hm
Task Cod I NPT NPT Depth Phase Description of Operations
_
(hr)
(usft) i_
01:30 - 03:30
2.00
CASING P INT1 STAGE UP PUMPS TO CEMENTING RATE
- ATTEMPT TO SLOWLY STAGE PUMPS FROM
li
4 BPM UP TO 5 BPM
- REDUCE RATE BACK DOWN TO 4 BPM
SEVERAL TIMES TO MANAGE PRESSURES
WHILE WELL CLEANS UP
-SLOWLY STAGE UP 1-2 STROKES AT A TIME
AND LET PRESSURES STABILIZE BEFORE
ATTEMPTING TO INCREASE RATE.
- INCREASE IN LOSSES WITH RATE
OBSERVED
- @ 4 BPM LOSS RATE OF 4 BPH
- @ 4.5 BPM LOSS RATE OF 13 BPH
- UNABLE TO STABILIZE PRESSURES ABOVE
4.5 BPM
DISCUSS WITH ODE AND LOOK AT CEMENT
PROGRAM. DECIDE TO REDUCE
CEMENT/DISPLACEMENT RATE FROM 5 BPM
TO 4 BPM DUE TO THE THREE -FOLD
INCREASE IN LOSSESAND INABILITY TO GET
PRESSURES TO STABILIZE AT 5 BPM.
SIMOPS:
SPOT TRUCKS AND RIG UP SCHLUMBERGER
'CEMENTERS
1.00
03'.30 - 04:30
CASING P INT1 PICK-UP WEATHERFORD CEMENT HEAD AND
RIG UP CEMENT LINES
- STAGE BACK UP TO 4 BPM IN 1/2 BPM
INCREMENTS
- @ 2 BPM; 580 PSI; 4 % RETURN FLOW
- @ 3 BPM; 640 PSI; 5 % RETURN FLOW
- @ 4 BPM; 820 PSI; 6 % RETURN FLOW
Printed 9/6/2018 1:12:37PM *All depths reported in Drillers Depths*
Printed 9/6/2016 1:12:37PM *AII depths reported in Drillers Depths'
North America -ALASKA - BP
Page 21 of 38
Operation Summary Report
Common Well Name: LS -12
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
,Start Date: 7/29/2016 End Date: 8/22/2016
X3-017WO-C:(6,616,817.00)
Project: Lisburne
Site: Lis DS OS
Rig Name/No.: PARKER 272
Spud Date/Time: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
_
UWI: 500292169400
Active datum: LS -12A (actual) @67.35usft (above Mean Sea Level)
Date
From -To Has
Task Code NPT NPT Depth I Phase
Description of Operations
1 (hr)
04:30 - 07:30 3.00
_ __ _ _ (usft) i
CASING P INTI
CEMENT 7- PRODUCTION LINER AS
FOLLOWS:
-FILL LINES WITH WATER AND PRESSURE
TEST TO 4000 PSI FOR 5 MINUTES
- PUMP 30 BBLS OF 11.0 PPG MUDPUSH II
f
SPACER @ 3-5 BPM, 650 PSI
- DROP FIRST DART
- PUMP 89 BBLS OF 15.8 PPG CLASS G TAIL (03
3.5 BPM, EXCESS VOLUME 104% (YIELD 1.17
CU.FT/SK)
- DROP SECOND DART
j
- PUMP 5 BBLS OF WATER W/
SCHLUMBERGER CEMENTERS
- DID NOT SEE FIRST DART LATCH UP INTO
LOWER WIPER PLUG
PERFORM DISPLACEMENT WITH RIG PUMPS
- 157 BBLS DISPLACED AT4 BPM: ICP 400 PSI
j
WITH 4% RETURN FLOW; FCP 620 PSI
-OBSERVED LOWER WIPER PLUG LAND AND
SHEARAT 900 PSI, 74 BBLS INTO
I DISPLACEMENT
�- LOST ALL RETURNS WHEN CEMENT
TURNED THE CORNER
REDUCE RATE TO 3 BPM PRIOR TO PLUG
BUMP: FINAL CIRCULATING PRESSURE 620
PSI
TOTAL DISPLACEMENT VOLUME 162 BBLS
(MEASURED BY STROKES @ 96% PUMP
EFFICIENCY)
- PUMPED 427 SKS TOTAL
- CEMENT IN PLACE AT 07:20 ON 8/13/2016
- HOLD 600 PSI OVER BUMP PRESSURE; 1220
PSI.
- DID NOT SET HANGER OR PACKER.
- FILL ON THE BACKSIDE WHILE HOLDING
PRESSURE ON THE PLUG; 40 BPH LOSS
RATE
0730 - 08:30 1.00
CASING N CENT 8,752.00 INTI
CALL ODEANDANCHORAGE LEADERSHIP
TEAM TO DISCUSS CEMENT LOSSES AND
-
PLAN FORWARD
- CONTINUE TO KEEP THE HOLE FULL WITH
08:30 - 09:30 1.00
CASING N CEMT 8,752.00 INT1
THE TRIP TANK; STATIC LOSS RATE 40 BPH
SET LINER HANGER PER WEATHERFORD
REPRESENTATIVE AND RIG DOWN CEMENT
EQUIPMENT
- INCREASE PUMP PRESSURE TO 2500 PSI
TO SET HANGER
- BLEED OFF PRESSURE AND SLACK OFF TO
140K
- VERIFY HANGER SET
- RIG DOWN CEMENT HOSE
- PRESSURE UP 1500 PSI AND PICK UP UNTIL
PRESSURE DROPS OFF, INDICATION
RUNNING TOOL CLEAR OF LINER
HANGER/PACKER ASYEMBLY
- RIG DOWN CEMENT HEADAND LAY DOWN
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 100 BPH
Printed 9/6/2016 1:12:37PM *AII depths reported in Drillers Depths'
North America - ALASKA- SP
Operation Summary Report
Page 22 of 36
Common Well Name: 1.5-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016 X3-017WQ-C: (6,616,817 00 )
__—_
PraJect: Lisburne Site: Lis DS OS - -
Rig Name/No.: PARKER 272 Spud DateTme: 1/30/1987 12:00 OOAM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. UWI: 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level
Date
From -To
Him
Task
Code NPT NPT Depth
Phase Description of Operations
INTI PULLOUTOFTHE HOLE ONELEVATORS
09:30 - 13:30
4.00
CASING
N
I CEMT
8,752.00
WITH LINER HANGER RUNNING TOOL
- FROM 8750' MD TO 663' MD
- PU 94K, SO 90K AT 8750' MD
- PU 93K, SO 93K AT 2600' MD
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 150 BPH
INTI CONTINUE TO PULL ON ELEVATORS AND LAY
13:30 - 14:00 0.50 CASING
N
CEMT
_
8,752.00
DOWN WEATHERFORD LINER HANGER
RUNNING TOOL
-STAND BACK 5"HWDP
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 150 BPH
P
8,752.00
_
INTI SERVICE TOP DRIVE AND ST -BO
14:00 - 14:30 0.50 CASING
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 150 BPH
N T CEMT 8,752.00
14:30 - 15:30 1.00 CASING
_
INTI WAIT FOR DOWN-SQUEEZEASSEMBLY FROM
WEATHERFORD
- POLISH MILL, BIT SUB AND PORTED SUB
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 130 BPH
15:30 - 16:00 0.50 CASING
N CEMT 8,752.00
INTI MAKE UP AND RUN IN THE HOLE WITH
DOWN -SQUEEZE ASSEMBLY
- MAKE UP POLISH MILL, LINER TOP MILL, BIT
SUB WITH INVERTED FLOAT, AND PORTED
SUB
- RUN IN THE HOLE ON 5" HWDP TO 728' MD
- CONTINUE TO KEEP THE HOLE FULL;
_ STATIC LOSS RATE 130 BPH
16.00 - 21:00 5.00 CASING N CEMT 8,752.00 INTI RUN IN THE HOLE WITH DOWN -SQUEEZE
ASSEMBLY ON 4" DRILL PIPE ON ELEVATORS
- FROM 728' MD TO 8764' MD
- FILL PIPE EVERY 4000' MD
- PU 167K, SO 132K AT 8760' MD
NO-GO INSIDE PBR AT 8764' MD WITH 4K
- MAKE UP 15' PUP AND HEAD PIN FOR
CEMENTJOB.
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 100 BPH
N CEMT 8,752.00 INTI CLEAN RIG AND PERFORMGENERAL RIG
MAINTENANCE WHILE WAITING FOR
SCHLUMBERGER CEMENT
SPOTAND RIG UP CEMENTERS WHILE
WAITING FOR THICKENING TIME TEST TO
FINISH ON CEMENT BLEND.
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 85 BPH
N CEMT 8,752.00 INTI CONTINUE TO RIG UP CEMENTERS WHILE
WAITING FOR THICKENING TIME TEST TO
FINISH ON CEMENT BLEND.
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 85 BPH
1:12:37PM *All depths reported in Drillers Depths'
21:00
- 00'.00
3.00
CASING
8/14/2016
0000
- 01:00
1.00
CASING
ASSEMBLY ON 4" DRILL PIPE ON ELEVATORS
- FROM 728' MD TO 8764' MD
- FILL PIPE EVERY 4000' MD
- PU 167K, SO 132K AT 8760' MD
NO-GO INSIDE PBR AT 8764' MD WITH 4K
- MAKE UP 15' PUP AND HEAD PIN FOR
CEMENTJOB.
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 100 BPH
N CEMT 8,752.00 INTI CLEAN RIG AND PERFORMGENERAL RIG
MAINTENANCE WHILE WAITING FOR
SCHLUMBERGER CEMENT
SPOTAND RIG UP CEMENTERS WHILE
WAITING FOR THICKENING TIME TEST TO
FINISH ON CEMENT BLEND.
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 85 BPH
N CEMT 8,752.00 INTI CONTINUE TO RIG UP CEMENTERS WHILE
WAITING FOR THICKENING TIME TEST TO
FINISH ON CEMENT BLEND.
- CONTINUE TO KEEP THE HOLE FULL;
STATIC LOSS RATE 85 BPH
1:12:37PM *All depths reported in Drillers Depths'
Common Well Name: 1-5�12
Event Type: RE -ENTER -ONSHORE (RON)
North America - ALASKA - BP Page 23 of 38
Operation Summary Report
Start Date: 7/29/2016 End Date: 8/22/2016
AFE No
K3 -017W0 -C: (6,616,817.00)
Rig Name/No.: PARKER 272 I Spud Date/Time: 1/30/1987 12:00:OOAM Rig Release: 8/25/2016 I
Active datum: 1-5-12A (actual) @67.35usft (abc
Date From - To Him
— (hr)
01:00 - 03:30 2.50
Mean Sea U
Task
I CASING
Code NPT NPT Depth
(usft)
N CEMT 8,752.00
Phase Description of Operations
INTI PERFORM REMEDIAL DOWN -SQUEEZE
CEMENT JOB ON 7" LINER
- PJSM WITH RIG CREW, SCHLUMBERGER
CEMENTERSAND WEATHERFORD LINER
HANGER REPRESENTATIVES
FILL LINES WITH FRESH WATER AND PT 250
PSI LOW/ 4000 PSI HIGH FOR 5 MINS EACH
CLOSEANNULAR PREVENTER AND
ESTABLISH INJECTION RATES FOR CEMENT
JOB
- @ 1 BPM, 175 PSI DP, NO CSG PRESSURE
- @ 2 BPM, 280 PSI OF, NO CSG PRESSURE
@ 3 BPM, 370 PSI DP, NO CSG PRESSURE
- @ 4 BPM, 1190 PSI DP, 795 PSI CSG
@ 5 BPM, 1295 PSI DP, 789 PSI CSG
- @ 6 BPM, 1430 PSI DP, 790 PSI CSG
BLEED OFF PRESSURE AND LINE UP TO
PUMP WITH SCHLUMBERGER CEMENTERS
- PUMP 20 BBL, 12 PPG MUDPUSH AT 6 BPM
- 1550 PSI DP, 767 PSI CSG
- PUMP 200 BBL, 15.8 PPG CLASS "G"
DEMENT AT BPM
- 25 BBLS AWAY: 1453 PSI DP, 776 PSI CSG
- 50 BBLS AWAY: 1160 PSI DP, 740 PSI CSG
- 75 BBLS AWAY: 961 PSI DP, 707 PSI CSG
- AT 96 BBLS AWAY, LOST "H"HEAD ON
CEMENT PUMP SWITCH TO "G" HEAD
- UNABLE TO ACHIEVE 6 BPM WITH "G"
HEAD.
- PUMP REMAINDER OF JOB AT 5 BPM
- 100 BBLS AWAY: 625 PSI DP, 733 PSI CSG
- 125 BBLS AWAY: 610 PSI DP, 737 PSI CSG
- 150 BBLS AWAY: 620 PSI DP, 769 PSI CSG
- 175 BBLS AWAY: 614 PSI DP, 810 PSI CSG
- 200 BBLS AWAY: 670 PSI DP, 795 PSI CSG
'- PUMP 20 BBL, 12 PPG MUDPUSH AT 5 BPM
- 330 PSI DP, 767 PSI CSG
SWITCH TO RIG PUMPS FOR REMAINDER OF
DISPLACEMENT
- PUMP 58.5 BBLS OF 10.5 PPG LSND (630
STROKES AT 96% PUMP EFFICIENCY)
- UNDER DISPLACE CEMENT IN DRILL PIPE
- 10 BBLS CEMENT LEFT IN PIPE
- 20 BBLS MUDPUSH LEFT IN PIPE
- 100 STKS: 96 PSI DP, 714 PSI CSG
- 200 STKS: 980 PSI DP, 859 PSI CSG
- 300 STKS: 1086 PSI DP, 848 PSI CSG
- 400 STKS: 1175 PSI DP, 842 PSI CSG
- 500 STKS: 1250 PSI DP, 850 PSI CSG
- 630 STKS: 1330 PSI OF, 838 PSI CSG
- SLACK OFF 80K AND SET LINER TOP
PACKER PER WEATHERFORD
REPRESENTATIVE
-BLEED OFF PRESSURE, OPENANNULAR
AND VERIFY LINER TOP PACKER SET
- WELL STATIC, NO LOSSES
PUMPED A TOTAL OF 200 BBLS, 1017 SKS,
15.8 PPG, CLASS "G" CEMENT
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths'
North Amenca- ALASKA - BP
Operation Summary Report
Page 24 of 38
Common Well Name: L5.12
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 7/29/2016
End Date: 8/22/2016
X3-017WQ-C: (6,616,817.00)
Project: Lisburne
Site: Lis DS 05 --
--
Rig NameJNo.: PARKER 272
Spud Date/Time: 1/30/1987 12:00
OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
UWI' 500292169400
Active datum: L5 -12A (actual) @67.35usR (above
Mean Sea Level)
Date
From - To
Hm
Task
Code
NPT
NPT Depth Phase
Description of Operations
(hr)
(usR)
I
03:30 - 04:30 1.00
CASING P
8,752.00 INTI
CIRCULATE OUT EXCESS CEMENT AND
MUDPUSH
- 12 BPM, 2000 PSI
- DUMP CEMENT RETURNS AT SURFACE;
ESTIMATE 10 BBLS CEMENT BACK
04:30 - 08:30 2.00
CASING P
81752.00 INTI
RIG DOWN CEMENT HOSE AND CIRCULATING
LINES
- FLUSH LINES FROM SCHLUMBERGER
- PUMP 35 BBL NUT PLUG SWEEP AND
CHASE WITH NERF BALL AND 10.5 PPG LSND.
_
- MONITOR WELL FOR 10 MIN: STATIC
06:30 - 10:30 4.00
CASING P
8,752.00 INTI
PULL OUT OF THE HOLE ON ELEVATORS
WITH DOWN -SQUEEZE ASSEMBLY
- FROM 8700' MD TO 750' MD
_
10:30 - 12:00 1.50
CASING P
8,752.00 INT1
PULLAND LAY DOWN DOWN -SQUEEZE
ASSEMBLY
- MONITOR WELL FOR 10 MIN: STATIC
-LAY DOWN 5"HWDP
LAY DOWN WEATHERFORD POLISH MILLS
AND PORTED SUB ASSEMBLY.
12:00 - 12:30 1 0.50
CASING P
8,752.00 INTI
CLEAN =PORTED
RIG FLOOR
_
- MONITOR WELL: NO LOSSES, WELL STATIC.
12:30 - 14:30 2.00
BOPSUR P
INTI
CHANGE UPPER PIPE RAMS FROM 7" TO
3-1/2"x 5-7/8" VARIABLES
- DRAIN STACKAND PULL WEAR RING
- INSTALL TEST PLUG
-CLOSE BUND/SHEAR RAMS AND ENGAGE
MANUALLOCKS
- CHANGE OUT UPPER PIPE RAMS ON BOP
STACK
14:30 - 15:30 1.00
BOPSUR P
INTI
RIG UP TO TEST BOPE
INSTALL 4" TEST JOINT
- FILL STACK, CHOKE AND GAS BUSTER AND
('1530
PURGE AIR FROM LINES
- 21:30 6.00
SOPSUR P
INTI
PRESSURE TEST BOPE TO 250 PSI LOWAND
3500 PSI HIGH FOR 5 MIN EACH
- TEST WITH 4" AND 4-1/2" TEST JOINTS
-TEST ALARMS, PVTAND FLOW SHOW
- MONITOR WELL VIA HOLE FILL THROUGH
ANNULUS VALVES
-UPPER IBOP LEAK
- TEST WITNESSED WAIVED BYAOGCC REP
CHUCK SCHIEVE
21:30 - 00:00 2.50
BOPSUR N RREP
INTI
REMOVE AND REPLACE UPPER AND LOWER
BOP
-REMOVE FETTER RINGS AND HARDWARE
FROM TOP DRIVE
- BREAKAND REMOVE UPPER AND LOWER
IBOP
- INSTALL NEW UPPER AND LOWER IBOP
- INSTALL NEW SAVER SUB.
- UPPER IBOP ONLY COMPONENT THAT
WOULDN'T TEST. REPLACING LOWER IBOP
AND SAVER SUB AS A PREVENTATIVE
MEASURE
8/15/2016 00:00 - 03:00 T 3.00
BOPSUR N RREP
INTI
CONTINUE TO REPLACE UPPER AND LOWER
IBOP
- INSTALL NEW UPPER AND LOWER IBOP
- INSTALL FETTER RINGS AND HARDWARE
ON TOP DRIVE
INSTALL NEW SAVER SUB.
Printed 9/8/2016
1'12'37PM `AII depths reported in Drillers Depths'
North Annerica - ALASKA - BP Page 25 of 38
Operation Summary Report
Common Well Name: 15-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016 X3-017WO-C: (6,616,817.00)
Project: Lisburne Site: Lis DS OS
Rig Name/No.: PARKER 272
Spud Date/Time: 1/30/1987 12:00:OOAM Rig Release: 812512018
Rig Contractor: PARKER DRILLING CO. UWI: 500292169400
Active datum: 15-12A (actual) @67.35usft (above Mean Sea Level)
Date
From - To
Hm
Task
Code NPT NPT Depth Phase Description of Operations
_
(usR) _
_(hr)
03:00 - 04:00 1 1.00 BOPSUR
P INTI FINISH PRESSURE TEST BOPE TO 250 PSI
LOW AND 3500 PSI HIGH FOR 5 MIN EACH
- TEST NEW UPPER AND LOWER IBOP.
- MONITOR WELL VIA HOLE FILL THROUGH
ANNULUS VALVES
- TEST WITNESSED WAIVED BYAOGCC REP
CHUCK SCHIEVE
SEE ATTACHED TEST CHARTS _
P INTI RIG DOWN BORE TEST EQUIPMENTAND
04:00 - 05:30
1.50
WHSUR
PULL TEST PLUG
INSTALL WEAR RING.
P INT1 RIG UP AND TEST 7" LINER 250/3500 PSI FOR
_
05:30 - 07:00
1.50
CASING
5/30 CHARTED MINUTES.
- TEST MET BP TEST CRITERIA;
- SEE ATTACHED TEST CHARTAND
WELLBORE TESTING CRITERIA CALCULATOR
_
- 9.5 BBLS TO PRESSURE UP, BLED BACK 9.5
_4 BBLS
07LOO 07:30
0.50
CASING
P INTI BLOW DOWN AND RIG DOWN TEST
_
EQUIPMENT
07:30 - 11:00
3.50
DRILL
P INT1'PICK UP AND MAKE UP6-1/8" RSS DRILLING
ASSEMBLY PER BAKER DIRECTION DRILLER
TO 212'MD
- PERFORM STOP THE JOB DRILL AND AAR
WITH RIG CREW. SLIPS NOT WORKING
WHILE PICKING UP BHA. STOP JOB INSPECT
I � EQUIPMENT.
11:00 - 18:00
7.00
DRILL
_
P i INTI RUN IN THE HOLE WITH 6-1/8" RSS
ASSEMBLY FROM 1500' MD TO 10606' MD
- STRAP EACH ROW OF PIPE RUNNING IN;
ORIGINAL TALLY CORRECT
- SHALLOW HOLE TEST MWD AT 1700'MD
- FILL PIPE EVERY 2000' MD
- PU 162K, SO 122K AT 8752' MD
_
- HOLE TAKING PROPER DISPLACEMENT.
18:00 - 18:30
0.50
DRILL P INTI SERVICE TOP DRIVE, BLOCKS AND RIG
'FLOOR EQUIPMENT
DRILL P INTI WASH DOWN AND DRILL CEMENTAND FLOAT
118:30
- 23:30
5.00
EQUIPMENT IN SHOE TRACK TO WITHIN I0'
OF SHOE,
FROM 10606' MD TO 10800' MD
- WASH DOWN AT 1 BPM
- TAG CEMENT AT 10800' MO WITH 10K
DRI LL CEMENT FROM 10800'MD TO 10934'MD
- 270 GPM, 2010 PSI ON, 1990 PSI OFF
-40-80 RPM, 9K TORQUE ON, SK TORQUE
OFF
8A 5K WOB
- PU 187K, SO 138K, ROT 158K
- TAG PLUGS ON DEPTH AT 10861' MD
!i SPR: 10606' MD (8486' TVD), 10.5 PPG IN/OUT
- MP#1: 30/40 SPM, 665/870 PSI
MP#2: 30/40 SPM, 655/865 PSI _
- 00:00 0.50
!23:30
DRILL P INTI CIRCULATE ALL CEMENT OUT OF SYSTEM
PRIOR TO DISPLACING WELLBORE
- 275 GPM, 2420 PSI
-70RPM,7-8KTORQUE
Printed 9/6/2016 1:12:37PM `AII depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: L5-12
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016
Site: L - _ DS 06-_ "-.
Project: Lisburne 'is
Rig Name/No.: PARKER 272 Spud Date/Time: 1/30/1987 12:00 OOAM
Rig Contractor: PARKER DRILLING CO.
_Active datum: 1-5-12A (actual) @67.35usft (above Mean Sea Level)
Date Fran - To Hrs Task Code NPT NPT Depth Phase
(hr) (usft)
8/16/2016 .00:00 - 01:00 1.00 DRILL P INTI
-01:00
03:00 2.00
0400 1.00
05:30 1.50
l
05:30 - 07:00
DRILL
DRILL P
DRILL P
1.50 DRILL P
INTI
INTI
INTI
INT1
- 12:00 5.00 DRILL P PRODI
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths'
Page 26 of 38
AFE No
X3-017WQ-C: (6,616,81T00)
Rig Release: 8/25/2016
LIN 500292169400
Description of Operations
CONTINUE TO CIRCULATE ALL CEMENT OUT
OF SYSTEM PRIOR TO DISPLACING
WELLBORE
- 300 GPM, 2540 PSI
-70 RPM, 7-8K TORQUE _
DISPLACE WELL OVER FROM 10.5 PPG LSND
TO 8.6 PPG QUICKDRIL-N
-40 BBL HIGH VIS SPACER FOLLOWED BY 40
BBL EP MUD LUBE SPACER
- 300 GPM, 2580 PSI
- 70 RPM, 5K TORQUE
- MONITOR BBL IN/OUT THROUGHOUT
DISPLACEMENT
- ACTUAL PRESSURES VARIED FROM
MODELED PRESSURES BY+200 PSI
THROUGHOUT DISPLACEMENT
- OBTAIN SPR: 10925' MD (8740' TVD) 8.6 PPG
IN/OUT
- MP#1: 30/40 SPM, 435/595 PSI
- MP#2: 30/40 SPM, 440/585 PSI
FLOW CHECK WELL FOR 30 MIN
- WELL STATIC
- DISCUSS DISPLACEMENT AND FLOW
CHECK RESULTS WITH WELLS
SUPERINTENDENT; RECEIVE ATP.
DRILL OUT REMAINING SHOE TRACK FROM
10934' MD TO 10946' MD AND 20' OF NEW
FORMATION TO 10967' MD (8756' TVD)
270 GPM, 2010 PSI ON, 1990 PSI OFF
- 40-80 RPM, 9K TORQUE ON, 8K TORQUE
OFF
- 8-15K WOB
- PU 187K, SO 138K, ROT 158K
- LOST 18 BBLS WHILE DRILLING NEW
FORMATION; 54 BPH DYNAMIC LOSS RATE
CIRCULATE WELLAND ESTABLISH LOSS
RATES
- PICK UP TO LINER SHOEAND ESTABLISH
LOSS RATES
- DYNAMIC LOSS RATE - 40 BPH @ 270 GPM,
1330 PSI
- STATIC LOSS RATE- 12 BPH
DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM
10967' MD TO 11062' MD (95' IN 19 HOURS = 19
FPH WITH CONNECTIONS)
- DRILLAHEAD ON WP09, EMOC 10201
INSTANTANEOUS ROP = 20-25 FPH
- 300 GPM, 1550-1580 PSI ON/OFF BOTTOM,
120 RPM, 9-10.5 KFT-LBS TRQ ON BOTTOM,
9-9.5 KFT-LBS TRQ OFF BOTTOM, 5-15 KLBS
WOB
- 50 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
-SURVEY EVERY 30' IN BUILD SECTION WITH
DLS> 5DEG/100'
- NO BACKREAMING AT CONNECTIONS
- PUMP ONE 40 BBL 40 PPB DRILLAHEAD LCM
PILL WITH NO IMPROVEMENT IN LOSSES
North America - ALASKA - BP
Operation Summary Report
Page 27 of 38
Common Well Name: 1-5-12
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 729/2016 7 Eno Date: 8/22/2016
X3-017WQ-C: (6,616,817.00)
Project: Lisburne Site Lis DS 05
Rig Name/No.: PARKER 272
Spud Date/Time: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
UWI: 500292169400
Active datum: 1 5-12A (actual) @67.35usR (above Mean Sea Level_
Date
From - To
I Him
�AO
Task Code NPT NPT Depth
--- (usft)
Phase
Description of Operations
12:00 18:00
DRILL p--
PROD1
DIRECTIONALDRILL6-1/8" PROD HOLE IN
BUILD SECTION FROM 11062' MD TO 11211'
MD(149'IN 6 HOURS =25 FPH WITH
CONNECTIONS)
- INSTANTANEOUS ROP = 25-75 FPH
- 300 GPM, 1575.1600 PSI ON/OFF BOTTOM,
120-140 RPM, 9-10 KFT-LBS TRQ ON
BOTTOM,8-9 KFT-LBS TRQ OFF BOTTOM, 5-12
KLBS WOB
- 50 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
j
- SURVEY EVERY 30' IN BUILD SECTION WITH
DLS > 5DEG/100'
_
- NO BACKREAMING AT CONNECTIONS
18:00 - 00:00 6.00 DRILL P PROD1
DIRECTIONAL DRILL6-1/8"PROD HOLE IN
BUILD SECTION FROM 11211' MD TO 11362'
MD(151'IN 6 HOURS =25 FPH WITH
CONNECTIONS).
- INSTANTANEOUS FOR =35-75 FPH
- 300 GPM, 1600-1650 PSI ON/OFF BOTTOM,
140 RPM, 9-10 KFT-LBS TRQ ON BOTTOM, 8-9
KFT-LBS TRQ OFF BOTTOM, 5-10 KLBS WOB
- 50 BPH DYNAMIC LOSSES
-MW IN/OUT =8.6 PPG
SURVEY EVERY 30' IN BUILD SECTION WITH
CLS> 5DEG/100'
- NO BACKREAMING AT CONNECTIONS
- ACTUAL DRILLING TIME FOR 24 HOUR
REPORT PERIOD = 13.4 HOURS
- PUMP (2) 40 BBL 40 PPB DRILLAHEAD LCM
PILLS WITH NO IMPROVEMENT IN LOSS
RATE.
- SPRS @ 11265' MD, 8529' TVD
- MP1: 30 SPM = 440 PSI, 40 SPM = 600 PSI
MP2:_30 SPM=435 PSI, 40 SPM =590 PSI
8/17/2016 00.00 - 01-30 1.50 DRILL PPROD1
DIRECTIONAL R D H FROM
1' /8" PROD
11 O TO 11405MD IN OURS
29 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 30-80 FPH
- 300 GPM, 1525-1575 PSI ON/OFF BOTTOM,
140 RPM, 9-10 KFT-LBS TRQ ON BOTTOM,B-9
KFT-LBS TRQ OFF BOTTOM, 5-10 KLBS WOB
- 50 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
- SURVEY EVERY 30' IN BUILD SECTION WITH
OILS > 5DEG/100'
- NO BACKREAMING AT CONNECTIONS
- ACTUAL ROTATING TIME = ACTUAL
DRILLING TIME DURING FULL 24 HOUR
REPORT PERIOD = 1.4 HOURS.
OBSERVE CONSISTENT PRESSURE DECLINE
FROM 1550 PSI TO 1525 PSI OVER 20 MIN.
BEGIN TO TROUBLESHOOT PRESSURE LOSS
Primed 9/6/2016 1 12 37P *All depths reported in Drillers Depths"
Common Well Name: L5-12
Event Type: RE-ENTER- ONSHORE(RON)
Rig Contractor: PARKER DRILLING
Active datum: 1_5-12A (actual) 067.3
Date From -To
North America -ALASKA- BP
Operation Summary Report
Start Date: 7/29/2016 End Date: 8/22/2016
Sde: Lis DS 05
Spud DatarTime: 1/30/1987 12:00:OOAM
(above Mean Sea Level)
Him ITask Code NPT NPT Depth Phase
5.50 DRILL N DFAL 11,405.00 PROD?
Printed 9/6/2016 1:12:37PM *AII depths reported in Drillers Depths"
Page 28 of 38
AFE No
K3 -017W0 -C: (6,616,817.00)
Rig Release: 8/25/2016
UWI: 500292169400
Description of Operations
- OBSERVE TREND BETWEEN ROTATION AND
PRESSURE LOSS, -250 PSI PRESSURE LOSS
WHEN ROTATION INITIATED
- RULE OUT SURFACE SYSTEM
- SUSPECT ISSUE BETWEEN MOCS TOOL
AND BCPM IN MWD TOOLS BASED ON
TURBINE RESPONSES TO FLOWRATE
TROUBLESHOOTING
FUNCTION MOCS CIRC SUB AS FOLLOWS
-FUNCTION TOOL TO BYPASS MODE: DROP
1 63" STEEL BALL AND PUMP DOWN AT 175
GPM, 690 PSI. BALL LANDS ON SEATAT 1/2
STROKES CALCULATED TO BIT. OBSERVE
-200 PSI PRESSURE INCREASE, THEN
INCREASE PUMP RATE TO 250 GPM.
PRESSURE BUILDS TO 1000 PSI, THEN
DROPS SUDDENLY TO 700 PSI AT 250 GPM.
- INITIATE RECIPROCATION AND ROTATION
WITH 250 GPM, 700 PSI. NO PUMP
PRESSURE FLUCTUATIONS.
- FUNCTION TOOLTO NON -BYPASS MODE:
SHUT OFF PUMPS AND HOLD 0 PSI FOR 60
SEC. STAGE UP PUMPS TO 300 GPM, 1850
PSI. INITIATE ROTATION AND OBSERVE
PRESSURE DROP TO 1675 PSI (SAME
ROTATION -PRESSURE DROP RELATIONSHIP
AS BEFORE).
- MAINTAIN 300 GPM, 1675 PSI, 100 RPM BUT
UNABLE TO GET PULSE FROM MWD TOOLS
(TOO MUCH NOISE). SHUT DOWN ROTATION
AND TOOLS BEGIN TO PULSE.
- RECONFIRM NO ISSUES WITH SURFACE
FLUID SYSTEM, NOR WITH POWER
GENERATION SYSTEM.
- UNABLE TO DRILLAHEAD WITH
NOISE -FREE PULSES FROM MWD. ELECTTO
PULLOUT OF HOLE LOOKING FOR BHA
CRACKIISSUE
- 3.5 BOTTOMS UP CIRCULATED DURING
TROUBLESHOOTING.
- LOSS RATE = 50 BPH DYNAMIC
North America - ALASKA - BP
Operation Summary Report
Page 29 of 38
Common Well Name: L&12
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016
X3 -017W0 -C: (6,616,817.00)
Project: Usbume —._ — - 1 -sit _ --- _---
I Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud Date/Time: 1/30/1987 12:00 OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. _
TUW: 500292169400
Active datum: LS -12A (actual) @67.35usft (above Mean Sea Level)
Date From - To Him Task Code NPT NPT Depth Phase
Description of Operations
(hr) (usft)
07:00 - 17:00 10.00 DRILL N DFAL 11,405.00 PROD1
UNPLANNED TRIP FORBHA PROBLEM: PULL
OUT OF HOLE WITH 6-1/8" RSS DRILLING
ASSEMBLY FROM 11405' MD
- OBTAIN RIG MANAGER APPROVAL TO TRIP
I
OUT OF HOLE WITH LOSSES PER BRIDGING
DOCUMENT.
- FLOWCHECK WELL FOR 10 MIN ON BOTTOM
AND AT WINDOW (WELL ON LOSSES, 30 BPH
STATIC)
- PULLING SPEED IN OPEN AND CASED HOLE
= 50 FPM TO AVOID SIGNIFICANT OVERPULLS
AND INVESTIGATE PIPE FOR WASHOUTS
DURING TRIP.
NO HOLE ISSUES THROUGH OPENHOLE
- INITIAL PICKUP WEIGHT OFF BOTTOM = 190
KLBS
- SCREW INTO TOP OF HWDP AT 5029'MD.
OBSERVE SAME PRESSURE DROP VS
ROTATION TREND AS ON BOTTOM.
- RECORD LOSS RATE ON TOTCO EVERY 30
MIN DURING TRIP, LOSS RATE CONSISTENT
+ __ _
1700 - 20:00 3.00 DRILL[ N DFAL 11,405.00 PROD1
AT 30 BPH STATIC.
UNPLANNED TRIP FOR BHA PROBLEM:
LAYDOWN 6-1/8" DRILLING ASSEMBLY FROM
212' MD TO SURFACE.
- PUMP THROUGH BHAAND OBSERVE SAME
PRESSURE DROP VS ROTATION TREND AS
ON BOTTOM.
- FLOWCHECK WELL PRIOR TO PULLING BHA
THROUGH BOP STACK (-30 BPH STATIC
LOSSES)
- WHILE PULLING BHA UP THROUGH STACK,
OBSERVE MUD SPRAYING FROM FILTER
SUB -UPPER FLEX COLLAR CONNECTION.
BREAK CONNECTION AND DISCOVER
SIGNIFICANT CRACK IN FILTER SUB PIN.
CIRCUMFERENCE OF FILTER SUB THREADS
= 12-1/4", LENGTH OF CRACK = 10". SEE
ATTACHED PHOTOS.
- RACK BACK MAJORITY OF BHA TO BE
RERUN FOLLOWING E -LINE LOGGING. WILL
REPLACE FILTER SUB, UPPER FLEX COLLAR
AND BIT FOR NEXT RUN.
-REMOVE NUCLEAR SOURCES PER BAKER
PROCEDURES
- GRADE BIT 2 -1 -IN GAUGE (SEE ATTACHED
PHOTOS)
STATIC LOSS RATE = 30 BPH
2000. - 20:30 0.50 DRILL P PROD1
SERVICEAND LUBRICATE RIG
20:30 - 22:30 2.00 EVAL., N CEMT 11,405.00 PROD1
UNPLANNED CEMENT EVALUATION LOG:
MIRU SLB E -LINE UNIT
- HOLO PJSM WITH E -LINE CREW AND RIG
TEAM FOR RIG UP AND LOGGING
NO PRESSURE CONTROL, ONLY INTEGRAL
LINE WIPER AND CUTTER APPROVED BY
WSUP PER 100204 SECTION 5.4.1.5
LOAD TOOLS TO RIG FLOOR AND MAKEUP
TOOLSTRING
-STATIC LOSS RATE = 30 BPH
Printed 9/6/2016 1 12 37P •All depths reported in Drillers Depths"
North America - ALASKA - BP Page 30 or 38
Operation Summary Report
Common Well Name: 1-5-12 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016 X3-017WQ-C: (6,616,817.00)
Project: Lisburne S"e: Lis DS OS
Rig Name/No.: PARKER 272 Spud DaNm-e: 1/30/1987 12:00:OOAM Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. UWI: 500292169400
Active datum: L5 -12A (actual) @67.35us" (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
_ (hr) (us")
22:30 - 00:00 1.50 EVAL N CEMT 11,405.00 PROD1 UNPLANNED CEMENT EVALUATION LOG:
RUN USIT LOG TO EVALUATE 7" LINER
PRIMARYAND REMEDIAL CEMENT JOBS
- LOG PER OCN #7 AND PETROPHYSICIST
WORK ORDER
- NO GAUGE RING RUN DUE TO SUCCESS
PULLING 6-1/8" BIT THROUGH LINER
-MONITOR WELL WITH CONTINUOUS
CIRCULATION OVER TOP OF WELL. RECORD
LOSS RATE EVERY 15 MIN ON TRIP SHEET,
STATIC LOSS RATE = 30 BPH
- SEE FULL DETAILS OF TOOLSTRING AND
TIME BREAKDOWN IN E -LINE AWGRS
REPORT FOR 8/17 - 8/18
LOGGING COMPLETED ON 8/18/16
8118/2016 00:00 - 06:30 6.50 EVAL N CEMT 11,405.00 PROD? UNPLANNED CEMENT EVALUATION LOG:
RUN USIT LOG TO EVALUATE T' LINER
PRIMARY AND REMEDIAL CEMENT JOBS
- LOG ENTIRE 7" LINER INTERVAL FROM
10933' MD (SHOE AT 10946' MD) TO 8552' MD
(200' ABOVE TOL AT 8752' MD)
-MONITOR WELL WITH CONTINUOUS
CIRCULATION OVER TOP OF WELL. RECORD
LOSS RATE EVERY 15 MIN ON TRIP SHEET,
STATIC LOSS RATE = 30 BPH
- SEE FULL DETAILS OF TOOLSTRING AND
TIME BREAKDOWN IN E -LINE AWGRS
REPORT FOR 8/17 - 8/18
- VERY LITTLE CONTINUOUS CEMENT
OBSERVED BEHIND 7" LINER, INITIAL LOG
INTERPRETATIONS SUGGEST ENOUGH FOR
ZONAL ISOLATION BETWEEN LISBURNE AND
CM3 (^(13) 6-11' INTERVALS FOR 102' TOTAL
EXCEEDS REQUIRED 96). TOC =8950'MID
- SEE ATTACHED PETROPHYSICIST
06:30 0700 0.50 EVAL N CEMT INTERPRETATION SLIDES _
''. - 17,405.00 PROD1 UNPLANNED CEMENT EVALUATION LOG
RDMO SLB E -LINE
OT.00 - 10:00 3.00 DRILL N DFAL 11,405.00 PRODI UNPLANNED TRIP FOR BHA PROBLEM:
MAKEUP AND RUN IN HOLE WITH 6-1/8" RSS
DRILLING ASSEMBLY FROM SURFACE TO 212'
MD
- FLOWCHECK WELL PRIOR TO RUNNING IN
HOLE (WELL ON 30 BPH STATIC LOSSES)
- NEW HYCALOG SK613A1B 6-1/8" PDC
- GR/RES/DIRIVSS/COPILOT (DH
WOBlTRQ)/DEN/NEU/CALIPER/STARTRAK
IMAGING TOOL
JARS PLACED WITH 3 STANDS 4" HWDP
4842' BEHIND BIT
-BHA WEIGHT =46 KLBS
!, - SHALLOW HOLE TEST TOOLS AT 1800'MD
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths"
North America - ALASKA - BP Page 31 of 38
Operation Summary Report
Common Well Name: 1612 AFE No
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/29/2016 End Date: 8/2�X3-017WQ-C:(6,616,817.00)
Project: Lisburne — � Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud DateRme: 1/30/1967 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO. _ UWI: 500292169400
Active datum: L5 -12A (actual) @67.35usft (above Mean Sea Level)
Date
From - To
Hn'
Task Code NPT NPT Depth Phase Description of Operations
(hr)
_ (usft) _
DRILL N DFAL 11,405.00 PRODI UNPLANNED TRIP FOR BHA PROBLEM: TRIP
10:00 - 17:30
_
1 7.50
IN HOLE WITH 61/8" RES DRILLING
ASSEMBLY ON ELEVATORS FROM BHA AT 212'
MD TO PREVIOUSLY DRILLED DEPTH OF
11405' MD
- FILL PIPE EVERY 2000' MD
- 30 BPH STATIC LOSS RATE DURING TRIP
- NO ISSUES TRIPPING THROUGH OPENHOLE
- WASH FINAL STAND TO BOTTOM WHILE
DOWNUNKING TO ACTIVATE TOOLS; 275
GPM, 1470 PSI, 80 RPM, 6KFT-LBS TRQ
- SPRS WITH NEW BHA @ 11405' MD, 8955'
TVD
- MP1: 30 SPM = 480 PSI, 40 SPM = 660 PSI
_ _ -MP2: 30 SPM =460 PSI, 40 SPM =650 PSI
-FROM
17.30 - 22:00
4.50
DRILL P PROD1 DIRECTIONAL DRILL 6-V PROD HOLE
11 405'MD TO 11527' MD (776' IN 4.5 HOURS =
26 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP =25-100 FPH
- 275 GPM, 1400-1450 PSI ON/OFF BOTTOM,
150 RPM, 9.5-10.5 KFT-LBS TRO ON BOTTOM,
9 KFT-LBS TRQ OFF BOTTOM, 10-13 KLBS
WOB
- 20 BPH DYNAMIC LOSSES
- MW IN/OUT= 8.6 PPG
- SURVEY EVERY 30' IN BUILD SECTION WITH
DLS> 5°/100'
- NO BACKREAMING AT CONNECTIONS AND
NO SWEEPS/LCM PUMPED
- INVERT POINTAT 11506' MD
- RIG SERVICE COMPLETED AT CONNECTION
- OH TORQUE = 1-2K FT -LBS
- DH WOB = 11-12K LBS
DRILL N DFAL 11,521.00 PROD1 TROUBLESHOOT MWD PULSER. TOOL NOT
-r-
22:00 - 23:00 1.00
PULSING. PROCEED THROUGH PROTOCOL
_
AND TOOL BEGINS TO PULSE AGAIN
2300 - 0000 1.00
DRILL P PROD1 DIRECTIONAL DRILL 61/8" PROD HOLE FROM
11521' MD TO 11582' MD (8966' TVD) AT
MIDNIGHT (61' IN 1 HOUR =61 FPH WITH
CONNECTIONS)
- SAME PARAMETERS AS 17:30-22:00 TIME
INTERVAL
- ACTUAL ROTATING TIME = ACTUAL
DRILLING TIME DURING FULL 24 HOUR
REPORT PERIOD =4.3 HOURS
- DIRECTIONAL SUMMARY: 7' ABOVE AND T
RIGHT OF PLAN. OBSERVING MINOR
LATERAL VIBRATIONS AND NO SLICK SLIP.
Printed 9/6/2016 1:12:37PM *All depths reported in Drillers Depths'
Common Well Name: 1-5-12
Event Type: RE-ENTER- ONSHORE (RON)
I Rig Name/No.: PARKER 272
Active datum: 15-12A (actual) @67.35usft (ab
Date From - To Him
(hr)
8/19/2016 00:00 - GB -00 6 or
North America - ALASKA - BP Page 32 of 38 I
Operation Summary Report
Start Date: 729/2016 1 End Date: 8/22/2016
Site: Lis DS 05
Sea Level)
Task Code NPT NPT Depth
(usft)
)RILL P
07:30 I 1.50 1 DRILL I N I DFAL 1 11,740.00
- 12:00 I 4.50 DRILL I P
AFE Na
— - -
�X3017WQ-C: (6,616,817.00)
UWI: 500292169400
Phase
Description of Operations
PRODi
DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM
11582' MD AT MIDNIGHT TO 11740' MD (158' IN
6 HOURS = 26 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 40-100 FPH
-275 GPM, 1450 PSI ON/OFF BOTTOM, 150
RPM, 10-11 KFT-LBS TRO ON BOTTOM, 8-9
KFT-LBS TRO OFF BOTTOM, 1013 KLBS WOB
- 25 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
- SURVEY EVERY 30' IN BUILD SECTION WITH
OILS > 5°/100'
- NO BACKREAMING AT CONNECTIONS
- DIFFICULTY GETTING MWD TO SEND
PULSES AT SURVEY POINTS, TOTAL TIME
DURING THIS SIX HOUR INTERVAL
DEDICATED TO PULSER ISSUES =-1.5
HOURS OVER THREE SURVEY POINTS
- DH TRO = 1-2 KFT-BS, DH WOB = 1013 KLBS
- CROSS FAULT 1 AT 11673' MD, 8958' TVD, NO
INCREASE IN LOSS RATE
PROD1
TROUBLESHOOT MWDPULSER. TOOL NOT
IPULSING. PROCEED THROUGH PROTOCOL
AND TOOL BEGINS TO PULSE AGAIN
PROD?
I DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM
11740' MD TO 11930' MD (190' IN 4.5 HOURS =
42 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 50-100 FPH
- 275 GPM, 1475-1500 PSI ON/OFF BOTTOM,
150 RPM, 10.5-11.5 KFT-LBS TRO ON BOTTOM,
8.5-9.5 KFT-LBS TRO OFF BOTTOM, 13 KLBS
WOB
- 30 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
- SURVEY EVERY STANDAND NO
BACKREAMING AT CONNECTIONS.
- DIFFICULTY GETTING MWD TO SEND
PULSES AT SURVEY POINTS, TOTAL TIME
DURING THIS 4.5 HOUR INTERVAL
DEDICATED TO PULSER ISSUES = 30 MIN
OVER TWO POINTS
- DH TRQ = 1-2 KFT-BS, DH WOB = 10-13 KLBS
- 35 BBL HI -VIS SWEEP AT 11930' MD WITH NO
INCREASE IN CUTTINGS OBSERVED
- SPRS @ 11930' MD, 8916' TVD
- MPI: 30 SPM = 490 PSI, 40 SPM = 660 PSI
- MP2: 30 SPM = 480 PSI, 40 SPM = 650 PSI
Printed 916/2016 1:12:37PM *AII depths reported in Drillers Depths"
Common Well Name: 1-5-12
Event Type: RE-ENTER- ONSHORE(RON)
North America - ALASKA - BP
Operation Summary Report
Start Date: 7/29/2016 End Date: 8/22/2016
Site: Lis DS 05
AFE No
K3-017WO-C: (6,616,817.00)
Page 33 of 38
Rig Name/No.: PARKER 272
1 Spud Date/Time; 1/30/1987 12:00:OOAM
Rig Release: 8!25/2016
Rig Contractor: PARKER DRILLING CO.
UWI. 500292169400
Active datum: 1-5-12A (actual) Q67.35usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase
(hr) __� (usft)
12:00 - 18:00 + 8.00 DRILL P —PRC D1
Description of Operations
DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM
��,
11930' MD TO 12246' MD (316' IN 6 HOURS = 53
FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP =75-100 FPH
- 275 GPM, 1475-1540 PSI ON/OFF BOTTOM,
150 RPM, 11-11.5 KFT-LBS TRQ ON BOTTOM,
9-8.5 KFT-LBS TRQ OFF BOTTOM, 13 KLBS
WOB
- 30 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
"
- SURVEY EVERY STANDAND NO
BACKREAMING AT CONNECTIONS.
- DIFFICULTY GETTING MWD TO SEND
PULSES AT SURVEY POINTS. ABLE TO
SUCCESSFULLY START TOOL EACH
CONNECTION BY KEEPING PUMPS OFF FOR
10 MIN.
—�
- DH TRQ = 1-2 KFT-BS, DH WO8 = 10-13 KLBS _
18'.00 - 0000 6.00 DRILL P PRODI
DIRECTIONAL DRILL6-1/8"PROD HOLE
LATERAL SECTION FROM 12246' MO TO 12548'
MD, 8790' TVD AT MIDNIGHT (302' IN 6 HOURS
= 50 FPH WITH CONNECTIONS)
INSTANTANEOUS ROP =50-150 FPH
- 275 GPM, 1540 PSI ON/OFF BOTTOM, 150
RPM, 11-12 KFT-LBS TRQ ON BOTTOM, 9
KFT-LBS TRO OFF BOTTOM, 14 KLBS WOB
- 30 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
- SURVEY EVERY STANDAND NO
BACKREAMING AT CONNECTIONS.
- DIFFICULTY GETTING MWD TO SEND
PULSES AT SURVEY POINTS. ABLE TO
SUCCESSFULLY START TOOL EACH
CONNECTION BY KEEPING PUMPS OFF FOR
10 MIN.
- DH TRQ = 1-2 KFT-BS, DH WOB = 11-14 KLBS
- ACTUAL DRILLING/ROTATING TIME FOR
PAST 24 HOUR REPORT TIME= 14 HRS, 58%
- SPRS Q 12496' MD, 8797' TVD
- MP1: 30 SPM = 550 PSI, 40 SPM = 710 PSI
- MP2: 30 SPM = 545 PSI, 40 SPM = 700 PSI
- DAILY LOSSES = 660 BBLS, TOTAL FOR
_
,INTERVAL -3159
1:12:37PM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 34 of 38
Common Well Name: L5-12
6 HOURS = 72 FPH WITH CONNECTIONS)
AFE No-- ---------
Evem Type: RE-ENTER- ONSHORE (RON)
Start Date: 7/29/2016
End Date: 8/22/2016
X3-017WQ-C: (6,616,817.00)
Project: Lisbume
—� Site: Lis DS OS -
WOB, 11-14 KLBS DHWOB, 1-2 KFT-LBS
Rig Name/No.: PARKER 272
Spud Date/Time: 1/30/1987
12:00 DGAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
_
UW1: 500292169400
_
Active datum: L5 -12A (actual) @67.35u5ft (above Mean Sea Level)
- MW IN/OUT = 8.6 PPG
Date From - To
Him
Task
Code I NPT
i NPTDepth Phase
Descnp8on of Operations
PULSES AT SURVEY POINTS. ABLE TO
(hr)
SUCCESSFULLY START TOOL EACH
(usft)
106:00 - 12:00 6.00 DRILL P
8/20/2016 00:00 - 06:00
_
6.00
DRILL
_
P
PRODt
DIRECTIONAL DRILL B-1/8" PROD HOLE FROM
12548' MD AT MIDNIGHT TO 12979' MD (431' IN
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths'
6 HOURS = 72 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 100-200 FPH
- 275 GPM, 1550-1575 PSI ON/OFF BOTTOM,
150 RPM, 11-12 KFT-LBS TRO ON BOTTOM,
9-10 KFT-LBS TRQ OFF BOTTOM, 12-14 KLBS
WOB, 11-14 KLBS DHWOB, 1-2 KFT-LBS
DHTRQ
- 45 BPH DYNAMIC LOSSES INCREASING TO
80 BPH DYNAMIC LOSSES AT 12840' MD
(UNMAPPED FRACTURE).
- MW IN/OUT = 8.6 PPG
- SURVEY EVERY STAND AND NO
BACKREAMING AT CONNECTIONS
- DIFFICULTY GETTING MWD TO SEND
PULSES AT SURVEY POINTS. ABLE TO
SUCCESSFULLY START TOOL EACH
CONNECTION BY KEEPING PUMPS OFF FOR
10 MIN.
- REVERT POINT #1 @ 12815' MD
106:00 - 12:00 6.00 DRILL P
PROD1 DIRECTIONAL DRILL 6-118" PROD HOLE FROM
12979' MD TO 13348' MD (369' IN 6 HOURS = 62
FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = HELD BACK TO 100
FPH FOR DIRECTIONAL CONTROL
- 275 GPM, 1575-1615 PSI ON/OFF BOTTOM,
150 RPM, 11-12 KFT-LBS TRQ ON BOTTOM,
9-10 KFT-LBS TRO OFF BOTTOM, 14 KLBS
WOB, 11-14 KLBS DHWOB, 1-2 KFT-LBS
DHTRQ
- 80-100 BPH DYNAMIC LOSSES
- MW IN/OUT = 8.6 PPG
- SURVEY EVERY STAND AND NO
BACKREAMING AT CONNECTIONS
- DIFFICULTY GETTING MWD TO SEND
PULSES AT SURVEY POINTS. ABLE TO
SUCCESSFULLY START TOOL EACH
CONNECTION BY KEEPING PUMPS OFF FOR
10 MIN.
- 13069' MD: PUMP 40 BBLS 40 PPB LCM PILL
WITH -10 BPH IMPROVEMENT IN DYNAMIC
LOSS RATE
- 13158' MD: PUMP 40 BBLS 40 PPB LCM PILL
WITH 5 BPH IMPROVEMENT IN DYNAMIC
LOSS RATE
- SPRS @ 13250' MD, 8797' TVD
- MPi: 30 SPM =570 PSI, 40 SPM = 740 PSI
- MP2: 30 SPM = 565 PSI, 40 SPM = 748 PSI
Printed 9/6/2016 1:12:37PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 35 of 38
Common Well Name: 1-5-12
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 7/29/2016'. End Date: 8/22/2016
X3-017WQ-C:(6,616,817.00)
Project: Lisburne
'i'—Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud Date/time: 1/30/1987 12:00 OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
_
UWI:500292169400
Active datum: 1.5-12A (actual) @67.35usR (above Mean Sea Level)
Date
From - To Him
Task
Code
I NPT NPT Depth Phase
Description of Operations
12:00 20:30 850
DRILL
P
I PROD1
—
DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM
13348' MD TO WELL TOTAL DEPTH AT 13914'
MD, 8762' TVD (566' IN 8.5 HOURS = 67 FPH
WITH CONNECTIONS)
1 - INSTANTANEOUS POP =HELD BACK TO 100
FPH FOR DIRECTIONAL CONTROL
- 275 GPM, 1600-1685 PSI ON/OFF BOTTOM,
150 RPM, 11-13 KFT-LBS TRQ ON BOTTOM,
10-11 KFT-LBS TRQ OFF BOTTOM, 8-14 KLBS
WOB, 11-14 KLBS DHWOB, 1-2 KFT-LBS
DHTRQ
- 70-80 BPH DYNAMIC LOSSES
-MW IN/OUT =8.6 PPG
- SURVEY EVERY STAND AND NO
BACKREAMING AT CONNECTIONS
- DIFFICULTY GETTING MWD TO SEND
PULSES AT SURVEY POINTS. ABLE TO
SUCCESSFULLY START TOOL EACH
CONNECTION BY KEEPING PUMPS OFF FOR
1 10 MIN.
- 13355' MD: PUMP 40 BBLS 40 PPB LCM PILL
WITH 5 BPH IMPROVEMENT IN DYNAMIC
LOSS RATE
- 13729' MD: PUMP 40 BBLS 40 PPB LCM PILL
WITH 5 BPH IMPROVEMENT IN DYNAMIC
11 LOSS RATE
- INVERT POINT #2 @ 13371' MD
- TOE UP INTO HRZAT TD PER PLAN (TLSB
13796' MD, 118' MD, 16' TVD HRZ OPEN)
- ACTUAL ROTATING/DRILLING HOURS FOR
1 - 24 HOUR REPORT PERIOD = 14.5 HRS (71%
_ ON BOTTOM TIME)
20:30 - 00'.00 1 3.50 DRILL P PROD1 PLANNED WIPER TRIP: CIRCULATE HOLE
CLEAN WITH 2 BOTTOMS UP (+2500
STROKES TO ACCOUNT FOR -20% LOSS
RATE)
- 350 GPM, 2275 PSI, 180 RPM, 10-11 TRQ,
RECIPROCATE FULL STAND AT 1000 FPH
- DYNAMIC LOSS RATE = 60 BPH
- NO INCREASE IN LOSS RATE AS FLOWRATE
INCREASED FROM 275 GPM TO 350 GPM AT
To
- HRZ SHALE AND CRUDE OIL CONFIRMED IN
FIRST BOTTOMS UP AFTER TD
- NO ISSUES RECIPROCATING THROUGH HRZ
SHALE
- PUMP 40 BBL HI -VIS SWEEP WITH NO
INCREASE IN CUTTINGS
- FLOWCHECK WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM (STATIC LOSS RATE _
20 BPH)
- FINAL PICKUP WEIGHT= 195 KLBS,
SLACKOFF = 130 KLBS, ROTATING = 155 KLBS
- SPRS @ 13914' MD, 8762' TVD
- MP1: 30 SPM = 560 PSI, 40 SPM = 750 PSI
- MP2: 30 SPM = 570 PSI, 40 SPM = 745 PSI
- TOTAL LOSSES FOR THE PAST 24 HOUR
REPORTING PERIOD = 1690 SBLS, TOTAL
FOR HOLE SECTION = 4849 BBLS
Printed 9/6/2015 1:12:37PM 'All depths reported in Drillers Depths'
Common Well Name: 1.5-12
Event Type: RE-ENTER- ONSHORE(RON)
DRILLING CO.
Active datum: L5 -12A (actuz
DateFrom
8/21/2016 00:00 -
North America -ALASKA - SP
Operation Summary Report
Start Date: 7/29/2016 End Date: 8/22/2016
Site: Lis DS 05
Spud Data/Time: 1/30/1987 12:00 OOAM
(above Mean Sea
Him Task
Code NPT NPTDepth Phase
--_- _ (usft)
P PROD1
Page 36 of 38
APE No
X3-017WQ-G (6,618,81200 )
Rig Release: 8/25/2016
UWI: 500292169400
Description of Operations
HOLE WITH 6-1/8" DRILLING ASSEMBLY ON
ELEVATORS FROM WELL TO AT 13914' MD TO
1 7" SHOE AT 10946' MD
- UNABLE TO PULL ON ELEVATORS FROM
13820' MO TO 13245' MD WITH <50 KLBS
OVERPULL. BACKREAM FROM 13820'MD TO
13245' MD; 300 GPM, 1750 PSI, 150 RPM, 10-12
KFT-LBS TRO, 600 FPH.
- PULLING SPEED ON ELEVATORS = 60-90
FPM
- STATIC LOSS RATE WHILE TRIPPING = 20-40
BPH
- INITIAL PICKUP WEIGHT OFF BOTTOM = 195
KLBS, PICKUP/SLACKOFF WEIGHT AT SHOE _
205/130 KLBS
04:30 - 07�DRILL P PROD1 PLANNED WIPER TRIP: CIRCULATE HOLE
CLEAN AT 7" SHOE WITH 2 BOTTOMS UP
- 350 GPM, 1950 PSI, 180 RPM, 8-9 TRQ, 1000
JFPH RECIPROCATION FOR 60' STROKES
_ - DYNAMIC LOSS RATE = 60 BPH
07:00 - 10'.00 3.00 DRILL P PROD1 PLANNED WIPER TRIP' TRIP IN HOLE WITH
6-1 /8" DRILLING ASSEMBLY ON ELEVATORS
FROM 7" SHOE AT 10946' MD TO 13870' MD
J (44' OFF ORIGINAL WELLTD AT 13914' MD).
- MINOR TIGHT SPOT AT 13180' MD (NEAR
FAULT#2). ABLE TO WORK THROUGH AND
MAKE REPEAT PASS WITH NO ISSUES.
EXTREME TIGHT HOLE FROM 13796' MD TO
13870'MD. EVENTUALLY UNABLE TO WORK
DOWN PAST 13870' MD WITHOUT MAJOR
PACKOFF AND TORQUE ISSUES. WORK PIPE
FREE AND PULL BACK UP ABOVE HRZ AT
113796' MD.
INITIAL SLACKOFF WEIGHTAT SHOE = 148
KLBS, FINAL SLACKOFF/PICKUP WEIGHT
NEAR BOTTOM = 205/126 KLBS
- RUNNING SPEED = 75 FPM, FILL PIPE
EVERY 20 STANDS
- STATIC LOSS RATE WHILE TRIPPING = 30
BPH
NOTE: DECISION TO NEVER UTILIZE
BOTTOM 124' OF WELLBORE (HRZ). NEW
IWELL USEABLE TD= 13790' MD (PLANNED
Pnmed 9/6/2016 112:37PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 37 of 38
Operation Summary Report
-- — -
Common Well Name: LS12
-
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2016 End Date: 8/22/2016
X3-017WQ-C: (6,616,81T00)
Project: Lisburne
Site: Lis DS OS
Rig Name/No.: PARKER 272 Spud Daterrime: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor. PARKER DRILLING CO.
UWI' 500292169400
_
Active datum: L5 -12A (actual) @67.35usR (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase
Description of Operations
(hr) (usn)
10:00 - 13:30
3.5L
P PROD1
FINAL TRIP FROM TD: CIRCULATEHOLE
CLEAN AT 13914' MD WELL TD WITH 2.5
BOTTOMS UP
- 300 GPM, 1750-1775 PSI, 180 RPM, 11-12
INITIAL TRQ, 8-9 KFT-LBS FINAL TRQ,
RECIPROCATE FULL STANDAT 1000 FPH
- DYNAMIC LOSS RATE = 55 BPH
- PUMP 40 BBL HI -VIS SWEEP WITH MINOR
INCREASE IN CUTTINGS
- FLOWCHECK WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM (STATIC LOSS RATE _
30 BPH)
- FINAL PICKUP WEIGHT = 195 KLBS,
SLACKOFF = 140 KLBS
- SPRS @ 13790' MD, 8780' TVD
- MPI: 30 SPM = 538 PSI, 40 SPM = 705 PSI
_
- MP2: 30 SPM = 530 PSI, 40 SPM = 697 PSI
13:30 - 18:00
2.50
DRILL
P
PROD?
FINALTRIP FROM TD: PULLOUTOFTHE
HOLE WITH 6-1/8" DRILLING ASSEMBLY ON
ELEVATORS FROM WELL TD AT 13790' MD TO
T' SHOE AT 10946' MD
-MINOR TIGHT SPOTS AT 11490' MD, 12790'
MD, 8 13103' MD (ALL WIPED CLEAN ON
REPEAT PASSES)
-PULLING SPEED =75-90 FPM
- STATIC LOSS RATE WHILE TRIPPING = 30
BPH
- INITIAL PICKUP WEIGHT OFF BOTTOM = 195
KLBS, PICKUP/SLACKOFF WEIGHT AT SHOE_[__ _
_
184/140 KLBS
16:00 - 16:30
0.50
DRILL P PRODi
FINAL TRIP FROM TD: CIRCULATEHOLE
CLEAN AT7"SHOE WITH 1.5X4"ANNULUS
VOLUMES. DROP 1-5/8"MOCSACTIVATION
BALL AFTER PUMPS DOWN. (SERVES AS DP
DRIFT AND TO OPEN MOCS FOR LINER TOP
CIRCULATION)
- 300 GPM, 1530 PSI, 180 RPM, NO PIPE
MOVEMENT
- DYNAMIC LOSS RATE = 55 BPH
- FLOWCHECK WELL FOR 10 MIN AT 7" SHOE
= STATIC LOSS RATE OF 30 BPH
16:30 - 17:00
0.50
DRILL
P—
PRODi
FINAL TRIP FROM TD: PULLOUTOFHOLE
WITH 6-1/8" DRILLING ASSEMBLY FROM 7"
SHOE AT 10946' MO TO 7" LINER TOP AT 8752'
MD.
- PULLING SPEED = 150 FPM
- STATIC LOSS RATE WHILE TRIPPING = 30
BPH
- INITIAL PICKUP WEIGHT AT SHOE = 184
KLBS, PICKUP/SLACKOFF WEIGHT AT TOIL=
158/132 KLBS
Printed 9/6/2016 1:12:37PM •AII depths reported in Drillers Depths'
North Amenca -ALASKA - BP
Operation Summary Report
— ---- ...._.
Common Well Name: L5-12
Event Type: RE-ENTER- ONSHORE (RON) . Start Date: 7/29/2016 End Date: 8/22/2016
Project: LisburneSite: Lis DS 05
Rig Name/No.: PARKER 272 Sputl Date/Time: 1/30/1987 12:00 OOAM
Active datum: L5 -12A (achial) LQ67.35usft (above Mean Sea L
Date From - To Him Task
(hr)
17:00 --1900 + 2.00 i DRILL
1900 - 2200 3.00 DRILL
2200-. - 0000 2.00 DRILL
8/22/2016 00:00 - 01:00 1.00 DRILL
0100 - 01:30 0.50 BOPSUR
01:30 - 02:00 0.50 DRILL
Code NPT
NPT Depth Phase
(usft)
P
PROD1
PROD?
I
P�--
PROD1
P
PROD1
P -
PROD1
P
-� PROD1
_.
Printed 9/6/2016 1 12 37P *All depths reported in Drillers Depths`
Page 38 of 38
AFE No
%3-017WQ-C: (6,616,817.00 )
UWI: 500292169400
Description of Operations
FINAL TRIP FROM TD: i;tcaATEHOLE
CLEAN AT TOP OF 7" LINER WITH 1.5
BOTTOMS UP THROUGH MOCS TOOL. PUMP
DRY JOB. MOCS TOOL CLOSES AFTER I MIN
OF 0 GPM.
- BREAK CIRCULATION THROUGH MOCS
TOOL WHILE IT IS AT LINER TOP DEPTH.
- 340 GPM, 840 PSI, 50 RPM, 4-5 TRQ, 1000
FPH, NO RECIPROCATION
- CIRCULATE 40 BBL HI -VIS SWEEP SURFACE
TO SURFACE WITH MINOR INCREASE IN
CUTTINGS
- DYNAMIC LOSS RATE = 55 BPH
- SERVICE AND LUBRICATE RIG.
FINAL TRIP FROM TD: PULL OUT OF THE
HOLE WITH 6-1/8" DRILLING ASSEMBLY FROM
7" LINER TOP AT 8752' MD TO BHA AT 211' MD.
- PULLING SPEED -= 265 FPM
- STATIC LOSS RATE WHILE TRIPPING = 30
BPH
- INITIAL PICKUP WEIGHT AT LINER TOP = 158
KLBS
- UNANNOUNCED KWT DRILLANDAAR WITH
FISCHER CREW
LAYDQWN JAR STAND ON TRIP
FI NAL TRIP FROM TD: LAYDOWN 6-1/8"
DRILLING ASSEMBLY FROM 211' TO
SURFACE.
- FLOWCHECK WELL FOR 10 MIN PRIOR TO
PULLING BHATHROUGH BOP STACK (STATIC
LOSS RATE = 30 BPH)
- BHA DETAILS AND COMPLETION OF TASK IS
ON 8/22/16 REPORT.
TOTAL LOSSES FOR 24 HOUR REPORTING
PERIOD = 1113 BBLS, TOTAL FOR HOLE
SECTION = 5962 BBLS
FINALTRIP FROM TD: COMPLETE LAYING
DOWN 6-1/8" RSS DRILLING ASSEMBLY FROM
211' MD TO SURFACE.
- DOWNLOAD MWD DATA ON RIG FLOOR TO
EXPEDITE PROCESS OF SENDING DATATO
ANCHORAGE FOR ANALYSIS
- GRADE BIT 1 -1 -IN GAUGE, SEE ATTACHED
PHOTOS.
- STATIC LOSS RATE = 30 BPH
COMPLETE WEEKLY BOP FUNCTION TEST
CLEAN AND CLEAR RIG FLOOR AFTER
TRIPPING.
DAYS PER 10K= 27.3 113.58 DAYS TO DRILL
4974' MD FROM START OF WINDOW MILLING
TO LD FINAL BHA)
END PARKER 272 RON EVENTAT 02:00 ON
8/22/16. BEGIN COMPLETION EVENT FOR
4-1/2" PRODUCTION LINER AND 4-1/2" TUBING
Printed 9/6/2016 1:13:10PM *All depths reported in Drillers Depths'
North America -ALASKA - BP
Page 1 of 8
Operation Summary Report
Common Well Name: 15-12
- -- _ -_— --
AFE No
Event Type: COM- ONSHORE (CON)
i Start Dale: 8/222016 End Date: 8/25/2016
X3-017WQ-C: (3,430,344.00)
Project: Lisburne
Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud Data/Time: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.—
UWI: 500292189400
Active datum: 1-5-12A (actual) @67.35usfl (above Mean Sea Level)
Date From -To Hire
Task Code NPT NPT Depth Phase
Description of Operations
_ (hr)
_ (usft)
822/2016 02:00 - 04:00', 2.00
CASING N WAIT 13,914.00 RUNPRD
BEGIN CON EVENTAT 02:00 WITH PARKER
RIG 272
WAIT ON 4-1/2"PROD LINER SWELL PACKER
& SLIDING SLEEVE LAYOUT FROM
ANCHORAGETEAM
- ANCHORAGE GROUP UNABLE TO LOGIN TO
COMPUTERS BECAUSE OF BP IT ERROR. NO
I PROGRESS MADE ON SWELL PACKER
04:00 - 17:00 7.00
It_�_ _
CASING P RUNPRD
LAYOUT
WA1!7`01\14-11 /2" PROD LINER SWELL PACKER
& SLIDING SLEEVE LAYOUT FROM
j
ANCHORAGETEAM
- CONTINUOUSLY MONITOR WELL WITH
CIRCULATION OVER TOP, STATIC LOSS RATE
=30 BPH
- ANCHORAGE TEAM ANALZYING MEMORY
STARTRAK RESISTIVTY IMAGING DATA
– RIG LAYS DOWN EXCESS DRILLPIPE IN
DERRICK
- RIG SLIPSAND CUTS 68' (e WRAPS) 1-3/8"
DRILL LINE (1670 TON-MILES)
- CHANGE OUT OIL IN DRAWWORKS
_ _
'- CLEAN AND PAINT AROUND RIG
11:00 - 21:00 10.00
CASING P RUNPRD
_
BUILD CEMENTLESS LINER TALLY AND
PREPARE TO RUN LINER
- CONTINUOUSLY MONITOR WELL WITH
CIRCULATION OVER TOP, STATIC LOSS RATE
=20 BPH
- PERFORM DERRICK INSPECTION. SERVICE
AND LUBRICATE RIG
-FINALIZETALLY. RECEIVE APPROVAL FROM
ODE AND NEW WELLS DELIVERY GROUP
- RIG UP TO RUN LINER; DOYON CASING YC
ELEVATORS, TONGS WITH TORQUE TURN
EQUIPMENT
- LAYOUT LINER EQUIPMENT RUNNING
ORDER IN PIPE SHED.
—
'- PJSM FOR RUNNING LINER WITH RIG TEAM
Printed 9/6/2016 1:13:10PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 2 of 8
Operation Summary Report
-- -- --
- -- --
Common Well Name: L5-12
— - ---
AFE No --
X3-017WO-C: (3,430,344.00)
Event Type: COM- ONSHORE (CON) Start Date: 8/22/2016 End Date: 8/25/2016
Project: Lisburne Site: Lis DS 05
Rig Name/No.: PARKER 272 Spud Data/Time: 1/30/1987 12:00 OOAM
Rig Release: 8/25/2016
Rig Contractor. PARKER DRILLING CO.
UWI: 500292169400
Active datum: 1-5-12A (actual) @67.35usft (above Mean Sea Level)
Data From -To Him Task Code NPT NPTDepth Phase
Description of Operations
'r- (hr)
(.ft)21:00
_
00:00 3.00 CASING P RUNPRD
RUN 4-1/2", 12.6/13.5#, 13CR, HYD521
CEMENTLESS PRODUCTION LINER FROM
SURFACE TO 2000'MD AT MIDNIGHT.
- FLOWCHECK WELL PRIOR TO RIH (WELL ON
LOSSES)
- CHECK FLOATS (PASS)
- BAKERLOKALL CONNECTIONS BELOW
LOWEST SWELL PACKER
- APPLY JET LUBE SEAL GUARD & TORQUE
TURN ALL HYD521 CONNECTIONS TO OPT MU
TORQUE 4700 FT-LBS
- RUNNING SPEED IN CASED HOLE = 90 FPM
- NCS, HALLIBURTON, WEATHERFORD REPS
CONFIRMING EQUIPMENTAS RUN IN HOLE
- RUN 53 FREE FLOATING CENTRALIZERS
-
(SHOE TRACK, JOINTS 1-51)
- FILL LINER ON FLY
- STATIC LOSS RATE WHILE RIH = 20 BPH
- LINER MAKEUP & RUNNING COMPLETED ON
18/23/16
626 BBLS LOST DURING 24 HOUR
REPORTING PERIOD, 6588 BBLS TOTAL FOR
HOLE SECTION
8/23/2016 00.00 - 0200 2.00 CASING P RUNPRD
RUN 4-1/2", 12.6/135#, 13CR, HYD521
CEMENTLESS PRODUCTION LINER FROM
2000' MD AT MIDNIGHT TO 3015' OVERALL
LENGTH.
- APPLY JET LUBE SEAL GUARD &TORQUE
TURN ALL HYD521 CONNECTIONS TO OPT MU
TORQUE 4700 FT-LBS
- RUNNING SPEED IN CASED HOLE = 90 FPM
- NCS, HALLIBURTON, WEATHERFORD REPS
CONFIRMING EQUIPMENTAS RUN IN HOLE
- RUN 53 FREE FLOATING CENTRALIZERS
(SHOE TRACK JOINTS 1-51)
- FILL LINER ON FLY
'- STATIC LOSS RATE WHILE RIH = 20 BPH
- CONFIRM PIPE COUNT IN PIPE SHED AFTER
LINER MADE UP
0200 - 03:00 1.00 CASING P RUNPRD
MAKEUP WEATHERFORD LINER HANGER
AND XO TO DRILLPIPE.
1
- WEATHERFORD REP ADDS M-GEL HI-VIS
PILL TO PBR
'-CONFIRM NEW LIFTING EQUIPMENT
-CIRCULATE ONE LINER VOLUME (47 BBLS);
S BPM, 130 PSI, NO PIPE MOVEMENT
- RIG DOWN LINER RUNNING EQUIPMENT
- LET SLIPS RIDE WHEN FIRST PICKING UP
ASSEMBLY WITH HANGER TO CONFIRM
THREADS HOLDING
- PICKUP/SLACKOFF WEIGHT OF FULL LINER
__
= 70 KLBS (P272 BLOCKS +• To = 35 KLBS)
303—:00
- 08:30 5.50 CASING P RUNPRD
RUN IN HOLE WITH PROD LINER ON 4"
DRILLPIPE FROM LINER OALAT 3015' MD
RUNNING SPEED IN 9-5/8" CASED HOLE = 90
1'
FPM, SPEED IN 7" LINER = 8752' MD
- NO ISSUES PASSING THROUGH T' LINER
TOP
- FILL PIPE EVERY 10 STANDS
- STATIC LOSS RATE = 20 BPH
Printed 9/6/2016 1:13:10PM *All depths reported in Drillers Depths*
Common Well Name: L5-12
Event Type: COM- ONSHORE (CON)
Project; Lisburne
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING I
Active datum: L5 -12A (actual) @67.3'.
Date I From - To
12:00
12:00 - 13:30
North America -ALASKA- BP
Operation Summary Report
Start Date: 8/22/2016 End Date: 8/25/2016
Site: Lis DS 05
Spud Daternme: 1/30/1987 12*00:00AM
(above Mean Sea Level)
Hrs i Task Code NPT I NPT Depth Phase
P
3.00 li CASING P
1.50 I CASING I P
Page 3 of 8
AFE No
K3-017WQ-C: (3,430,344.00)
DWI: 500292169400
Description of Operations
RUNPRD CIRCULATE 1.SX LINER + DRILLPIPE VOLUME
(195 BBLS) AT 10946' MD 7" SHOE
- 193 GPM, 520 PSI NO PIPE MOVEMENT
- DYNAMIC LOSS RATE = 45 BPH
- ROTATING TORQUES AT SHOE: 10 RPM =
4.5-6.5 KFT-LBS, 20 RPM = 4-7 KFT-LBS
-MW IN/OUT =8.6 PPG _
RUNPRD RUN IN HOLE WITH 4-1/2" PRODUCTION
LINER FROM 10946' MD 7" SHOE TO PLANNED
SET DEPTH AT 13792' MD.
- SIGNIFICANT ISSUE (ONE HOUR) GETTING
10953' MD, 7' DEEPER THAN 7" SHOE AT
10946'MD. CONSISTENTLY WORK 30 KLBS
SLACKOFF/OVERPULLS IN AREA.
EVENTUALLY WORK THROUGH WITH 2 BPM,
330 PSI
- NO OTHER ISSUES ENCOUNTERED IN
OPENHOLE
- WASH FINAL STAND DOWN WITH 1 BPM, 395
PSI
- FILL DRILLPIPE EVERY 10 STANDS
- FINAL PICKUP/SLACKOFF WEIGHTS =
188/122 KLBS (P272 BLOCKS+TD = 35 KLBS)
- TOLAT 10777' MD
- STATIC LOSS RATE = 20 BPH, TOTAL
LOSSES TO HOLE DURING RUN = 228 BBLS _
RUNPRD SET WEATHERFORD HANGER, RELEASE
RUNNING TOOL, & SET PACKER AS
FOLLOWS:
- PUMP 20 BBLS 8.5 PPG KCL HI -VIS PILL,
DROP 1.5" ALUMINUM BALL, PUMP 17 BBLS
8.5 PPG HI -VIS PILL
DISPLACE BALL TO WEATHERFORD KLC
LANDING COLLAR AT 13759' MD; 4 BPM, 860
PSI
- BALL LANDS ON SEAT 500 STROKES EARLY,
70% OF CALCULATED
PRESSURE UP TO 2500 PSI WITH NO SIGN
OF HANGER SET (EXPECTED 2000 PSI).
PRESSURE UP TO 2700 PSI AND HANGER
SETS. CONFIRM WITH 58 KLBS DOWN
- PRESSURE UP TO 3200 PSI, THEN 3500 PSI,
THEN 3800 PSI - UNABLE TO RELEASE
RUNNING TOOL (EXPECTED 3000 PSI). GAIN
APPROVAL FROMANCHORAGE TEAM TO
EMERGENCY RELEASE
- ROTATE 4 ROUNDS TO LEFT WITH 4
KFT-LBS TRQ AND SUCCESSFULLY
EMERGENCY RELEASE FROM HANGER.
PICKUPAND SET DOWN ON LINER TOP WITH
5 KLBS
- ROTATE 15 RPM AND SLACKOFF 53 KLBS TO
SET PACKER (OBSERVE SHEAR AT 33 KLBS
DOWN). LOSSES TO WELL IMMEDIATELY
HALT.
8/26/16 NOTE: WEATHERFORD LINER HGR
FOUND TO HAVE MANUFACTURING DEFECT
DURING TEARDOWN ON 8/25/16. SEE
Printed 9/6/2016 1:13:11OPM 'All depths reported in Drillers Depths'
21:00 - 23:00 2.00 RUNCOM P RUNCMP RIG UPTO RUN 4-1/2" TUBING
- DOYON CASING YC ELEVATORS, TONGS
WITH TORQUE TURN EQUIPMENT
I - CONFIRM PIPE HANDLING EQUIPMENT
- CONFIRM COUNT 8 LAYOUT IN PIPE BARN
- HOLD PJSM WITH RIG TEAM FOR RUNNING
PIPE _
23:00 - 00:00 1.00 RUNCOM P RUNCMP RUN 4-1/2" PRODUCTION TUBING FROM
SURFACE TO 400' MDAT MIDNIGHT
FLOWCHECK WELL PRIOR TO RIH (STATIC)
- BAKERLOK ALL CONNECTIONS BELOW
PACKER
- COMPLETION AND FULL DETAILS OF
TUBING RUN ON 824 REPORT
TOTAL LOSSES FOR 24 HOUR REPORTING
I PERIOD = 248 BBLS, TOTAL FOR HOLE
SECTION - 8837, WELL TOTAL = 9894 BBLS
Printed 9/6/2016 1.13.1 OPM *Ali depths reported in Drillers Depths'
North America - ALASKA - BP
Page 4 of 8
Operation Summary Report
— ----
Common Weil Name: LS-12
--
_ — --- - —
APE No
Event Type: COM- ONSHORE (CON)
Start Date: 8/222016 End Date: 8/25/2016
X3-017WO-C: (3,430,344.00)
Project: Lisburne
I Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud DateTme: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contractor PARKER DRILLING CO.
UWI: 500292169400
_
Active datum: L5-12A (actual) @67.35usft (above Mean Sea Level)
Date
From To
Him
Task
Cotle
NPT
i NPT Depth Phase
Desodption of Operations
(hr)
(usft)
13:30 - 15:00 1.50
CASING P i RUNPRD
PRESSURE TEST LINE-RTO P PACKER TO 250
PSI LOW FOR 5 MIN FOR 5 MIN AND 3500 PSI
HIGH FOR 30 MIN WITH 8.5 PPG KCLAGAINST
UPPER PIPE RAMS (PASSING TESTS PER BP
CRITERIA)
- NOTA WELL INTEGRITY TEST, ONLY TO
CONFIRM PACKER SET
- PUMP 9.1 BBLS, BLEED BACK 9.1 BBLS
15:W - 18:30 1.50 fCASING
P RUNPRD
-SEE ATTACHED CHART _
DISPLACE WELLABOVE 10777'MD TOP OF
4-1/2" LINER FROM B.BPPG QUICKDRIL-N MUD
TO NEW 8.5 PPG KCL
-APPLY 500 PSI WHILE STILL STUNG INTO
LINER TOP WITH RUNNING TOOLS. PULL UP
AND OBSERVE START OF PRESSURE DROP.
RAMP UP PUMPS TO FULL RATE
IMMEDIATELY AFTER FOR DISPLACEMENT
- 540 GPM, 2100 PSI ICP, 1700 PSI FCP,
RECIPROCATE 30' STROKES, NO ROTATION
- FLOWCHECK WELL FOR 10 MIN PRIOR TO
1630 - 2030 4.00
CASING P RUNPRD
PULLING OUT OF HOLE (STATIC)
PULLOUT OF HOLE WITH LINER RUNNING
TOOLS FROM 10777' MD TOP OF LINER TO
BHAAT 53' MD
- PULLING SPEED = 100 FPM (LIMITED FOR
SIMOPS LAYING DOWN DP OFFLINE)
- LAYDOWN -25 STANDS WITH OFFLINE
EQUIPMENT DURING TRIP OUT
20:30 - 21:00 0.50
_
CASING P RUNPRD
- HOLE TAKING PROPER DISPLACEMENT
LAYDOWN WEATHERFORD BUMPER SUB
ASSEMBLY AND LINER RUNNING TOOLS.
'- NO FLOWCHECK AT BHA BECAUSE <100'
- NO WEATHERFORD ROTATING DOG SUB TO
INSPECT TO CONFIRM PACKER SET
- NO SIGNS OF HYDRAULIC RELEASE ISSUES
DURING INITIAL INSPECTION(MUST TEAR
DOWN TOOLS)
21:00 - 23:00 2.00 RUNCOM P RUNCMP RIG UPTO RUN 4-1/2" TUBING
- DOYON CASING YC ELEVATORS, TONGS
WITH TORQUE TURN EQUIPMENT
I - CONFIRM PIPE HANDLING EQUIPMENT
- CONFIRM COUNT 8 LAYOUT IN PIPE BARN
- HOLD PJSM WITH RIG TEAM FOR RUNNING
PIPE _
23:00 - 00:00 1.00 RUNCOM P RUNCMP RUN 4-1/2" PRODUCTION TUBING FROM
SURFACE TO 400' MDAT MIDNIGHT
FLOWCHECK WELL PRIOR TO RIH (STATIC)
- BAKERLOK ALL CONNECTIONS BELOW
PACKER
- COMPLETION AND FULL DETAILS OF
TUBING RUN ON 824 REPORT
TOTAL LOSSES FOR 24 HOUR REPORTING
I PERIOD = 248 BBLS, TOTAL FOR HOLE
SECTION - 8837, WELL TOTAL = 9894 BBLS
Printed 9/6/2016 1.13.1 OPM *Ali depths reported in Drillers Depths'
Common Well Name: LS -12
Event Type: COM- ONSHORE (CON)
Project: Lisburne
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING(
Active datum: L5 -12A (actual) @67.3°
Date From -To
8/24/2016 00:00 - 11:00
North America - ALASKA - BP
Operation Summary Report
Start Date: 8/22/2016 End Date: 6/25/2018
Site: Lis DS 05
t (above Mean Sea Leve
Hrs Task
(hr)
11.00 RUNCOM
Code
P
NPT NPT Depth Phase
(usft)
RUNCMP
11:00 - 12:00 1.00 RUNCOM N WAIT 13,914.00
12:00 - 16:00 4.00 1 RUNCOM I P
16.00 - 17'.30 4— 1.50 RUNCOM P
Page 5 of 8
AFE No
X3-017WQ-C: (3,430,344.00)
Rig Release: 8/25/2016
UWI: 500292169400
Description of Operations
PRODUCTION TUBING FROM 400' AT
MIDNIGHT TO PLANNED LANDING DEPTH AT
10784' MD, 7' INTO 4-1/2" PROD LINER PER
(SPACEOUT DETAILS IN NEXT TIME ENTRY).
- RUNNING SPEED = 90 FPM
- APPLY JET LUBE SEAL GUARD (FRICTION
FACTOR= 1.0) AND TORQUE TURN ALL
VAMTOP THREADS TO OPT MU TORQUE OF
4440 FT -LBS
- VAMTOP REP ON RIG TO ASSESS THREAD
PREPARATION AND MAKEUP
- MW IN/OUT = 8.5 PPG
-SIMOPS: LAYDOWN.4" DRILLPIPE STANDS
WITH OFFLINE EQUIPMENT
RUNCMP DISCOVER BAD PIN THREADS ON TUBING
HANGER XO PUP. MOBILIZE TO BAKER FOR
BUCK OUTAND INSTALLATION OF NEW PUP
JOINT. RE -PRESSURE TEST HANGER +PUP
AT HES.
- SEE ATTACHED PHOTO
- TOTAL OF 4 HOURS OFF LOCATION:
REMAINDER OF WAITING TIME NOT NPT
BECAUSE TIME UTILIZED FOR CIRCULATING
RUNCMP ICIRCULATE IN NEW CORROSION -INHIBITED
FLUID INTOANNULUS AS FOLLOWS:
- REVERSE IN 279 BBLS 8.5 PPG 120°F
CORROSION -INHIBITED SEAWATERAT4 BPM,
255 PSI
- CHASE WITH 226 BBLS 8.5 PPG 120°F
SEAWATER AT 4BPM, 255 PSI TO PLACE
CORROSION -INHIBITED FLUID BELOW
PRODUCTION PACKER AND UPPER GLM AT
4214' MD
- OVERDISPLACE BY 5 BBLS, THEN WAIT TO
PUMP 5 BBLS BACK INTO PLACE UNTIL
AFTER TUBING LANDED.
RUNCMP SPACEOUTAND LAND TUBING AS FOLLOWS:
- TAG BASE ON PER AT 10789' MD ON TUBING
PIPE TALLY (1' DEEPER THAN LINER TALLY,
WITHIN EXPECTATION)
- LAYDOWN JOINT 251, PICKUP 19.83' AND
9 83' PUPS, PICKUP JOINT 251, RUN TBG
HANGER AND XO PUP- 42.64' RKS TO
SPACEOUT TUBING TAIL T INSIDE 11' PBR.
- VISUALLY CONFIRM LANDING HANGER
THROUGH OPEN IA VALVE.
- FMC REP ON LOCATION TO RUN IN
LOCKDOWN SCREWS. TORQUE GLAND
NUTSAND LDS TO 450 FT -LBS
- WSL CONFIRM PIPE COUNT IN PIPE SHED
FOLLOWING TUBING RUN.
FINAL TUBING SET DEPTH: 10784' MD (7' IN
ON 11' PBR)
- (3) X NIPPLES
- (4) GLMS
-FINAL PROD PACKER SET DEPTH: 10690'
MD, 8549' MD
- RHC -M PLUG IN LOWEST X NIPPLE AT 10766'
MD, 8606' TVD
Printed 9/6/2016 1:13.10PM *All depths reported in Drillers Depths*
Common Well Name: 15-12
Event Type: COM- ONSHORE (CON)
Project Lisburne
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: L5 -12A (actual) @67.35usft (ab(
Date From - To Hm
I (hr)
17:30 - 18:00 1 0.50
North America -ALASKA- BP
Operation Summary Report
Start Date: 6/2212016
End Date: 8/25/2016
i
LSite: Lis DS 05
Spud Date/Time: 1/30/1987 12:00 OOAM
an Sea Level)
Task Code NPT
NPT Depth Phase
(usft)
RUNCOM P
RUNCMP
16:00 - 20:00 I 2.00 j RUNCOM I P
RUNCMP
20:00 - 20:30 0.500 RUNCOM P
20:30 - 23:30 3.00 RUNCOM P RUNCMP
Printed 9/6/2018 1:13-IOPM 'All depths reported in Drillers Depths'
AFE No
(3,430,344.00 )
UWI: 500292169400
Description of Operations
MAKEUP LANDING JOINT AND DROP 1-7/8"
ROLLER STEM BALLAND ROD. ALLOW B&R
TO DROP FOR 15 MIN. LAYDOWN LANDING
JOINT
- PRIOR TO DROPPING B&R, CIRCULATE 5
BBLS DOWN TUBING TO CONFIRM
FLOWPATH, WASH OFF RHC -M PLUG
PROFILEAND RE -POSITION FLUID IN
SET PRODUCTION PACKER, PRESSURE TEST
TUBING AND IAAS FOLLOWS:
- CONDUCT PRESSURE CROSSCHECK
- PRESSURE UP ON TUBING SIDE TO 250 PSI
AND HOLD FOR FIVE MIN LOW TEST (PASS)
- PRESSURE UP ON TUBING SIDE TO 3500 PSI
AND HOLD FOR 30 MIN TEST (PASS). PROD
PACKER SETS DURING PRESSURE UP.
- VOLUME TO PRESSURE UP = 2.7 BBLS,
BLEED BACK= 2.7 BBLS
- LOSE 40 PSI IN FIRST 15 MIN, LOSE 10
PSI IN 2ND 15 MIN
- PRESSURE UP TUBING TO 2000 PSI
- PRESSURE UP ON IA SIDE TO 250 PSI AND
HOLD FOR FIVE MIN LOW TEST (PASS)
- PRESSURE UP ON IA SIDE TO 3500 PSI AND
HOLD FOR 30 MIN TEST (PASS).
-VOLUME TO PRESSURE UP= 8.1 BBLS,
BLEED BACK = 8.1 BBLS
- LOSE 10 PSI IN FIRST 15 MIN, LOSE 0 PSI
IN 2ND 15 MIN
- BLEED OFF IA PRESSURE TO 0 PSI, BLEED
OFF TUBING SIDE TO 0 PSI. OBTAIN
AUTHORIZATION TO PROCEED FROM WSUP.
- RE -PRESSURIZE TUBING TO 2000 PSI.
RE -PRESSURIZE IA 7O 3500 PSI. _
ESTABLISH TBG/IA COMMUNICATION AS
FOLLOWS:
- BLEED OFF TUBING PRESSURE QUICKLY
AND OBSERVE SHEAR OF UPPER GLM AT
4214' MD
- CONFIRM TWO-WAY CIRCULATION
- TBG SIDE: 2.5 BPM, 260 PSI
- IA SIDE: 2.5 BPM, 260 PSI _
RIG UP AND FREEZE PROTECT TUBING AND
IA TO 2200' MD/TVD WITH 152 BBLS 6.8PPG
DIESEL
- HOLD PJSM AND CONDUCT PRESSURE
CROSSCHECK. PRESSURE TEST LINES TO
2500 PSI LEAKTIGHT (PASS).
- REVERSE DIESEL INTO IAAT 2.5 BPM, 100
PSI ICP, 300 PSI FCP WITH RIG FREEZE
PROTECT PUMP
- AFTER 152 BBLS AWAY, LINE UP CIRC PATH
FROM TOP OF IATO TOP OF TUBING. ALLOW
DIESEL TO U -TUBE FOR 1 HOUR.
- 34 BBLS DIESEL IN TUBING, 118 BBLS
DIESEL IN IA
- DIESEL NOT HEATED BECAUSE RIG
BOILERS NOT ACTIVE
- WELL IS 131 PSI OVERBALANCED TO 7.8
PPG PORE PRESSURE AT 8941' TVD WITH
Printed 9/8/2018 1:13:10PM 'All depths reported i0 Drillers Depths'
North Amenoa - ALASKA - BP
Page 7 of 8
Operation Summary Report
Common Well Name: L5-12
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 8/222016
End Date: 8/25/2016
X3-017WQ-C: (3,430,344,00)
Project: Lisburne
Ue: Lis DS 05
Rig Name/No.: PARKER 272
Spud DateRime: 1/30/1987 12:00:00AM
Rig Release: 8/25/2016
Rig Contractor: PARKER DRILLING CO.
UWI1500292169400
Active datum: L5 -12A (actual) @67.35usR (above Mean Sea Level)
Date
From - To
Him
Task Code NPT
NPT Depth
Phase
Description of Operations
_I
(hr)
(usft)
2330 - 0000
- 02:30
0.50 �i
2.50
RUNCOM P
RUNCOM P
RUNCMP
RUNCMP
FMC REP ON LOCATION TO SET 4" CIW TYPE
H TWC ON DRY ROD
.TEST TWC
8/25/2016
100:00
- PRESSURE TEST TWC FROM ABOVE WITH
WATER TO 250 PSI LOW AND 3500 PSI HIGH
FOR FIVE MIN EACH
- PRESSURE TEST TWC FROM BELOW WITH
DIESELTO 250 PSI LOWAND 3500 PSI HIGH
FOR FIVE MIN EACH
- ALL PASSING TESTS, SEE ATTACHED
CHART
-SIMOPS: SLOWDOWN ALL LINES FROM
—
DIESEL U -TUBE
02:30 - 08:30
6.00
BOPSUR P
RUNCMP
NIPPLE DOWN FLOW RISER, BOPEAND HIGH
I
PRESSURE RISERS. SETBACKAND SECURE
i
BOPE STACK ON STUMP.
-SIMOPS: CLEAN FLOWBOX AND RIG FLOOR
DRIP PANS, LAYDOWN REMAIN 25 STANDS
OF 4" DRILLPIPE WITH OFFLINE EQUIPMENT.
08:30 - 10:30
2.00 t
WHSUR
RUNCMP
NIPPLE UP NEW FMC I3-5/8"X4-1/8"TUBING
HEAD ADAPTER AND 4-1/8" DOUBLE MASTER
VALVE DRYHOLE TREE
- ORIENT TREE VALVES TO LEFT TO MATCH
10:30 - 13:30
3.00
-____—__
WHSUR P
RUNCMP
ORIGINAL CONDITION OF WELL.
PRESSURE TEST TUBING HEAD ADAPTER
i
AND TREE
- FMC ON LOCATION TO TEST ADAPTER
FLANGE TO 250 PSI LOW FOR FIVE MIN AND
4500 PSI HIGH FOR 15 MIN (PASSING TESTS,
SEE ATTACHED CHARTS, WSUP
AUTHORIZATION TO PROCEED)
- RIG PRESSURE TESTS DRYHOLE TREE
AGAINST TWC WITH DIESEL TO 250 PSI LOW
AND 4500 PSI HIGH FOR 5 MIN EACH
(PASSING LEAK TIGHT TESTS)
- FILL TREE WITH 3 BOTTLES OF DIESEL 911
TO PREVENT FREEZING.
- SIMOPS GENERAL RIG DOWN
THROUGHOUT RIG IN PREPARATION FOR RIG
MOVE.
Printed 9/8/2018 1:13:10PM 'All depths reported i0 Drillers Depths'
Printed 9/6/2016 1 1310PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 8 of 8
Operation Summary Report
Common Well Name: LS-12
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 8/22/2016 End Date: 8/25/2016
X3-017WQ-C: (3,430,344.00)
Project: Lisburne
Site: Lis DS 05
Rig Name/No.: PARKER 272
Spud DaterNme: 1/30/1987 12:00:OOAM
Rig Release: 8/25/2016
Rig Contracbc PARKER DRILLING CO.
UWI: 500292169400
Active datum: L5-12A (actual) @67.35usR (above Mean Sea Level)
Date
From - To 1
Hrs
Task Code
NPT
NPT Depth Phase
Destnphon of Operations
(hr)
_
(us_tt)__
13:30 - 18:00 4.50
__
WHSUR P ' RUNCMP
CLEAN CELLAR AND SECURE
WELLHEADITREE.
- DOUBLE VALVES LEFT ON ANNULUS
OUTLETS (TO BE REMOVED POST RIG)
- SECURE EACH ANNULUS WITH QUARTER
TURN VALVE, PRESSURE GAUGE, NEEDLE
VALVE
- ALLTREENVELLHEAD VALVES LEFT CLOSED
TO GAUGES
GENERAL RIG DOWN THROUGHOUT RIG
- RIG DOWN INTERCONNECTS AND RIG
FLOOR
- SECURE TOP DRIVEAND BRIDLE UP.
- SKID CATTLE CHUTE AND RIG FLOOR
-PERFORM DERRICK INSPECTION. LOWER
MAST (370 KLBS PIROR TO LANDING ON
RACK)
CLOSEOUT WELLWORK TRANSFER PERMIT
WITH DS OPERATOR. LEAVE WELLHOUSE
SIGN.
HANDOVER WELLTO WELLS GROUP
FINAL T/1/0 = 0/0/0 PSI
RELEASE PARKER 272 RIG AT 18:00 ON
8/25/16. NEXT EVENT= 2018 ANNUAL
MAINTENANCE, THEN DS14-288 RST
PERFORMANCE SUMMARY:
- ACTUAL TOTAL DAYS = 27.25, 4.5 DAYS
AHEAD OF 31.7 DAY AFE, 1.3 DAYS AHEAD OF
28.5 DAY TARGET. TOTAL NPT= 151 HRS HRS
(6.3 DAYS, 23%, EXTENDED RIG MOVE TO L5
- 7" REMEDIAL CEMENT)
- ACTUAL TOTAL SPEND = -$10,650,000, -
$600K (6%) OVER $10.047MM AFE,
APPROXIMATELY EQUAL TO$10.67MM
TARGET
Printed 9/6/2016 1 1310PM *All depths reported in Drillers Depths'
Page 1 of 1
BP AMERICA
LOT / FIT Summary
Well Name: 15-12A
Surface
Leak Off
Test Test Test Depth
Test Depth AMW
Pressure
Pressure EMW
Date Type (TMD -Ft)
(TVD -Ft) (ppg)
(psi)
(BHP) (psi) (ppg)
08/09/16 LOT 8,938.25
7,219.25 1050
62000
4,558.74 12.15
Page 1 of 1
oil
Y
Q
�
J
Q
C
Q
V
��
�
G1
Q
N
A
m
N
CD
N
J
a
O7
N N
�
O_)
N
�
Q
Z
N
JJJJ
N
0
LL
N
N
R
W.v_w
p P
N
I
N'
h
Ya
P
O
a a z
U
r r <
I
Om
ts
2
r� m
m m
N d
qq p
Q Q
v
T
d >
� o
v
d t
J J G
d
L
v^i
rc S
m
O
N C
o �
ry c d u
w
III
'u
m�
o
U r
6
o 0
d a m A
0 0 0
O^
m
O
J� i 2 N O
n o
O
m
O o N
r
N n
O V N I
m
O
N
0 O
m
i
n
a n
m
13:
a _
I
a �
N
a
m
m
W
N
Z w N
T
e
1O m
a
o
0
3 x
v
n
o
m
•'
N
O
�
O
d
r
y
li
�I
6
w
q
_
N
a
E x o
LL N
0
00
m
w
_
o 00
od
Qm
Z
'
Y
(B
N
m
u
J
a p
m
J
J
D
J
x
Q C Q QQ
N N
m
d
Z?
W
Z Q
0 m m
Z J J J J J
L
C
C
N
/�
E
$ m
c
=
o
W
y p C
y
T O
O y
p O
O
N
C
2 C
N
o N d
o
p b
d
d N
y
D i
T
p
r
O
O
O
N
N
N
N
N
W
0
0
0
0
0
0
0
0
0
0
0
0
N
0
0
0
C!
0
t7
0
17
0
w
0
P
0
m
4
OZ
V
d
m n
p
m
N N
a
O
O
m
P
r
m
m
W
r
O
m
N
t7
S
Nm
O
P
N
Q
O
m
O
Q
N
n
O
O
m
O
z
O
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
U
a s
<
O
U
zr
p a
> j ❑
M M 0
1
J mo
❑
n
n a
W
pmt pm
W Z Q
t+l
O
r
P
m
m
(7
m
m
w
O
r
N
0
M
r
N
m
w
S W
E N
p P
O
P
P
P
V
P
V
P
p m
p m
p
ym
N
0
N
Q
p N
O
Q
P
P
P
V
O
V
P
o
N
P
w
t7
P
n
m
P
N
m
m
W
m
W
O
O
n
w
m
m
m
r
m
o
n
w
m
m
N
N
O
Q
P
m
m
Q
Q
P
Q
P
Q
Q
M
Cl
W
N
Nm
y
C O
p O
I C m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
O
m
d L
C Q
P
P
P
Q
Q
P
P
P
P
V
O
Y
P
P
Q
V
Y
P
P
fid, u
m
>>=
n
m
n
m
r
w
n
w
n
m
r
m
r
w
n
w
n
w
n
m
n
m
n
w
n
w
n
w
n
w
n
m
n
m
n
w
n
w
n
w
ce
N C
U U
N
N
m
m
m
m
m
m
m
m
m
m
m
m
m
m
N
m
m
m
d °
❑ O
C U d C
4 C U d
O
Om
'V
m
O
m
m
�
m
Q
0W
o
0
0
o
OO
o
(N
0
0
o
mO
w
qS
9
g
g
q
o
o
rc
W>❑oCzS
�=
%�
J F i 2 m❑
U
W
C
'
W
+ +
jpp
0
0
0
o
K
W
5 5
0
0
o
w
0
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
m
c7
m t
�
U U
(0
III
{L
m
N
O
O
O
W
O
m
O
m
O
Q
N
m
O
m
O
w
O
r
m
Q
O
N
m
W
m
r
m
O
m
l7
m
O
w
N
m
N
O
�
q
2 +
Er
2
+
p
O M
[g}]
—
g
1
j
O
m
m
N
O
m
m
m
m
m
n
O
m
O
m
m
m
N
m
O
O
m
N
m
O
m
O
O
P
O
r
O
O
m
N
O
m
J
C
.J
>>O
0
N N
F
m
N
m
N
w
m
W
r
r
P
O
N
m
�
N m b
YJ
CI
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
9
"❑
wE =
m
F
ry
W
a a
m
J
a
W
O r
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
D
Qu
t W O
C
F�
m o
d
C
L E m N
J
Z J J J
O
N
m
m
m
W
O
O
m
m
m
N
m
O
w
m
r
m
N
M
N
O
O
m
m
m
O
Cl
OO
7
P
O
r
O
O
N
O
m
QW
/1
E
W
P 0
m w
m
P
1�
m
P
m
m
r
m
m
N
O
m
m
V
Q
h
n
W
N
W
m
N
m
m
�i1
p
E e
m o
N
N
N
N
N
00l
m
n o o
y
a
r
o
N
ooq
a s '. 1 a
�
p
m
m
kv
,ot
on
O O W OI m m m n F fp IOp N O p twy ppj N N f r W m
0 0 0 0 ai m w w w w w m of m w w w of W of m w m m m
w w w w m m m
e m m m m r n n n n n n n n n n n n n n n n n n n n n
z C 6 v e a 6 e e 6 e v v e e a 6 e v v 6 a 6 6 a e 6 o v
m m m w w w m m m m
N m m w m N N N m N N m Vl N m m N w
O p m m
COm N m w m O` m N m 1N w OJ r N O Q m
r n r m w w q W O O m m
N N N Q p m m m
O C g O G OO O O O 7 r ' 1 f 1 ' ' ' , ' w n
N N tI m0 P P m N m w r n m m W m O O N N m Q P m m
0 0 0 0 cj 0 0 4 0 o cj cf o o q o
O O O IA w m N N O O N O m N O O m m O m m m m N O
Q m W N m O N p w P Q p Q e p w N l7 N N N N w m
r Q � w m Cl O m N fV Ol fpG Cmj O n P r' m N N W IG O 1� Q
N N N m ONl Vpl � tr+l M C P p Q Q Q N N IP N N Ywl d b� tm0 tmp �
D M
N N O O O O O O N N Om O O N w O O O O O m O m
I W N N r W N p m r m m n m m n n r 1� N m m m fD Ip m F fp
N Q N M1 m O N p mN n W Q n N pmj m Pt P 0 0 0 n OQl m m
Nl Cl l0 w p Q Q P p Q N m YI N N w m m w m r n r r n
� K
W ;: N
l7 Q m n N O m P M N Q m m m u( N O N N m
N N N N N N N N N N N N N N N N N N N N N N N N ry N N
'p e
w `
N
O O O O O O m m m O N N N N m NN N N t m n r r m m m
N N N N N N N N N N N N N N N N N N N N ry N N N
O O O O C O O O O O O O O O O O O O O O O C O O O O O
1�
w N
W N
I
O m O
n N
O
p
O
m
N
r
N
W
O m
m r
O O
m m
m N O
r r n
O
n
m
m
O
m
O
m
O O N
n m m
O
r m
N
Q m
n
W N
p
m
r
W
l7
O f0
m
w
P
w
m
O CJ
O
a
e
e
a
v
v
O
o
0
0
o
O
m
w
W
m
w
O
W
w
W
n
w
a
a
Se O
Q
a
p
Q
a
p
m
W
N
w
w
m
m
w
N
N
m
m
m
m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N
7
N N
r n
�
N N
o
0
0
a
O
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
C
M m
�
m
x
N W
z
(7
O
w
N
W
Vl
N
m
w
In
W
N
N
w
N
P
N
O''
N
W
O
N
O
O
n
M
w
m
I�
M
W
w
w
w
w
W
n
n
w
10
vi
No
N7
&
K
v
¢
c C
n
n
n
n&
n
n
No
N7
n
n
n
r
Ji
2.9
w
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
O O W OI m m m n F fp IOp N O p twy ppj N N f r W m
0 0 0 0 ai m w w w w w m of m w w w of W of m w m m m
w w w w m m m
e m m m m r n n n n n n n n n n n n n n n n n n n n n
z C 6 v e a 6 e e 6 e v v e e a 6 e v v 6 a 6 6 a e 6 o v
m m m w w w m m m m
N m m w m N N N m N N m Vl N m m N w
O p m m
COm N m w m O` m N m 1N w OJ r N O Q m
r n r m w w q W O O m m
N N N Q p m m m
O C g O G OO O O O 7 r ' 1 f 1 ' ' ' , ' w n
N N tI m0 P P m N m w r n m m W m O O N N m Q P m m
0 0 0 0 cj 0 0 4 0 o cj cf o o q o
O O O IA w m N N O O N O m N O O m m O m m m m N O
Q m W N m O N p w P Q p Q e p w N l7 N N N N w m
r Q � w m Cl O m N fV Ol fpG Cmj O n P r' m N N W IG O 1� Q
N N N m ONl Vpl � tr+l M C P p Q Q Q N N IP N N Ywl d b� tm0 tmp �
D M
N N O O O O O O N N Om O O N w O O O O O m O m
I W N N r W N p m r m m n m m n n r 1� N m m m fD Ip m F fp
N Q N M1 m O N p mN n W Q n N pmj m Pt P 0 0 0 n OQl m m
Nl Cl l0 w p Q Q P p Q N m YI N N w m m w m r n r r n
� K
W ;: N
l7 Q m n N O m P M N Q m m m u( N O N N m
N N N N N N N N N N N N N N N N N N N N N N N N ry N N
'p e
w `
N
O O O O O O m m m O N N N N m NN N N t m n r r m m m
N N N N N N N N N N N N N N N N N N N N ry N N N
O O O O C O O O O O O O O O O O O O O O O C O O O O O
1�
w N
W N
O
VI
O m O
n N
O
p
O
m
N
r
N
W
O m
m r
O O
m m
m N O
r r n
O
n
m
m
O
m
O
m
O O N
n m m
O
r m
N
Q m
n
W N
p
m
r
W
l7
O f0
m
w
P
w
m
O CJ
N m
W
m
w
t7 Q Q
p
Q
Q
P
N w
w N
N
m m
m
m
m
m
r I� r
n r
O
Se O
Y
V
m
d
C ..
4 O C T
U d N �i Ti ❑ N
1
m
m
N N
N N N
0
0
O
O
O
O O
O
N
N N m
O
O
O O
C OO O
O G O O
O
O
O
O
O O
O G O O O
O
O O O
m
w «
0 0 0 0 0 0 0 o m o N o
0 0 o w o 0
0 0 0 0 0 o c o 0 o c o 0 0 0 0 6
. a o o e o 0 0 0 0
u �
J �
O
rp N n N N m P W h N N P ry O W m m m m m W
ym N N p IT y p P m m p m p m ry N N p N N y N yp NQ pN p p ppp y N
W 4 p P O p p V V O P p V< O C P P p V P O P O V C p P
E w n n h h A r n n h r n n n Vh r r n n A r r n h n Y h r n i
W
m p r W m N w p mw m ^ N m m w p W m m p W Q w
N m N P m m N O W m mK n n m N N P Cl m N N O
m m m m m m m ai m ai r n n n rn r r n n n is is n n m
W W W W m m W W W W W W W w m W m W w W W W W W w W W
n n n n n n n n n n n n n n n n n n n n n n n r
L n n n n n n n n n n nn n n n n n n n n n n n n r n n
w m W m m w w m W W w w w W W w w m W w w W w W w W
N N N N N N N N N N N N m N m N N N N N N N N N N w
3 n
W
n m m m W W O 0 0 0 N N N N N N N N N N
N N N N N N N N N N N N N N N N N
O h O` N N O N N m 'O m O n P i n n N o r
N n W W O N m P p N m m N A r- W w O O N N
N N N NN N NN (V N N CI N N N N t7 '? t? t7 O)
O p P w O p p W Wm w p W p w P p p W p W W W W p w W W
m N N O O W m m n A m m P m N W m w N t+l m P P
qt Ifj N 0 W O (O CJ G h P 0 VI V (p w � M a♦ O N p �L 41
N W W P W W
10 m P P P W P W P W w W P W P p N P m P P P
N N N P m m N N O O A N W N m N N A m m
N N W N m O A P m N N W m` p ey m ty N A W C M N
m O m N A m O m m N A m O N P W m m N n W N P N
n m 9 W N O m N' N W W N W W N O N' m W p i p p W n O
m O m N W N m O W N p O O m N n N m W m
W W n P P P N N O O O m n A N y IN O QI fU fJ A at In q
N N N N N N N N N N N N
E _
N
W
N N N N N N N N N N N N N N r N
O O O O O O O O O O O O O O O O O O O O O O O O O O O
N O O N O O O N N N O N O N O O O O N N m O N N N
W N N N N p p W N N N7 O N W N m O N m N N A. W m
N N 0) tG Ol O n p m m N Q! fp CI r p m W W n W N
r W m m m W W W W W W W W O O O O O O N N N
m
I
n
m
O
P
Y)
(D
n
1d
m
j
0
p
Y
P v
W
W
O
10
O
n
O.
W
C.
O
N
m
m
Q
N
W
r
w
W
O
N
m
W
-
-
-
-
-
-
-
P-
N
N
N
N
N
S
�
o
N N
N
�
I
w
m m �
a
—
W w
� x
a
7 7
N
N
ppN
N
p m
y m
Q
Y
Wy
@W
A
0
W
p O
p
m
Y
y
yW
A
W
pW
p O
y
N
m
p@
n
n
n
n
n
r
r
n
@
O
O
O
W
W
N
W
W
m
m
W
w
n
W
r
ry
n
O
A
A
W
Vl
w
C9
W
m
W
N
W
N
W
N
W
m
W
Q
fp
p
fD
Ip
W
n
w
W
w
W
f0
O
n
n
N
n
d
Uy'
n
W w
r
W
W
W
w
w
W
W
w
W
W
W
W
W
W
w
W
w
W
W
W
W
W
w
w
W
(p
W
W
W
w
10
W
w
W
w
W
W
W
u
c n
n
n
n
n
n
n
n
n
n
n
n
n
n
dl
n
W
n
W
n
W
n
W
n
W
n
W
n
w
n
W
n
W
n
W
n
w
n
w
n
to,
r o
0
6
6
v
o
v
6
e
6
e
v
v
6
v
a
6
6
e
e
6
6
v
v
v
e
6
d d
o
n
n
n
n
n
n
A
r
n
n
n
n
n
n
n
n
n
n
n
n
n
n
r
r
n
n
W
w
w
W
W
w
w
w
W
W
w
w
w
w
W
w
w
In
W
w
m
W
W
W
w
w
w
q d
C V U N
Q
O
N
W^
N
n
O
N
O
W
W
0
w
0
w
0
r
W
N
m
P
n
t•'I
N
N
M
N
O
OI
OW
W
m
Y
m
N
N
O
W
N
N
N
V
N
N
N
7
7
7
7
o
o
g
o
0
o
g
q
o
0
I
C �
U
C
W
r
O
O.
m
N
m
m
m
P
W
P
N
N
n
N
O
Q
10
n
W
O
n
N
n
Q
n
IA
n
Ip
n
W
n
W
n
W
n
W
r
M1
@
A
Q
r
m
r
N
n
1�
O
n
w
W
t7
l7
m
l7
l7
m
'i
m
CI
l7
l7
m
m
it
.
.
.
.
.
.
.
17
M
t7
Vl
CL
m 2
4 a
m
c
LL
@
Q
O
N
N
W
r
0
O
N
m
m
N
tWI
Y
Q
N
[7
N
m
0
m
W
O
N
p
w
w
O
N
Q
w
w
m
N
n
G
Vj
6
w
N
m
W^
W
O
N
Y
W
N
N
N
N
m
m
m
m
P
Q
p
Y
N
N
Yl
N
W
W
w
W
r
A
A
n
W
d
WW
W
P
P
P
P
O
Y
W
m
m
Q
N
n
W
W
N
t+l
P
W
n
W
W
A
A
W
W
0
N
m
N
m
N
� _
g
m
m
m
P
p
W
W
O
N
VI
n
W
N
W
mp
W
W W
w
W
W
m
N
n
W
m
r
NO
n
V.
n
W
O
w
W
N
W
O
N
m
N
n
w
m
7
IR13Id
Q
N
m
m
N
fO
w
N
1p
O
Q
m
at
Ip
w
P
W
m
O
Y
n
O
w
N
P
n
W
W
W
W
w
P
Y
W
.
w
w
W
W
W
0
W
.
E _
a I
•H
Qw
Q
N
N
N
N
m
N
m
m
N
N
N
N
N
N
N
N
N
N
N
N
Q i
O
O
C
C
OO
O
O
C
C
OO
O
O
O
O
O
O
C
C
O
O
O
O
OO
O
O
O
O
Od O Q a
Q N Q Q
g
O
Z J J J J J
N
N
N
m
O
N
O
O
N
O
O
N
W
N
N
m
w
N
P
w
r
W
O
mp
Y
N
W
n
N
W
N
A
O
W
N
m
O
W
O
A
m..`
W
N
m
N
N
N
m
m
W
m
m
Ym]
r
p
W
Y
ld
0
O
N
N
n
N
N
p
m
W
N
tmy
W
O
N
N
n
N
_
Q
N
^_
A
A
A
W
W
w
W
N
-
f
'_
'_
`
'_
f
'_
--
N40
�^
r
2
n m .. a
m
0
SNj1
vim33 c
w'
`�`
r
Q 0 n W O N W N m n W O N N N N N N N N Q r N O N
N
tl
m M
M P P N O O O N O V N O P N w N
C
W �
J O
O O
n m n m m m W m m n m N o n A m n m o m
a
m m O N Q n W N P W W W P m m W N P n O Q W N
pm p m W n pn p n n p n p m m m p mQ p Wy W yWy W ppW W O 0 0 0 � � N
n - n n n n n n n n n n n n n n n n n n A r n n A r
W
N w O O w W W A N w m N W r W N 0 O P A W W N Q W W w
Q w w N N W Q W N W N O O N W w 0 N W O N W O N N
i A A r m 0 W W O O N w Q N W A W Q w w N N N W N
m m W w 0 w m n A n n A A n r A A W W 0 0 W W W W W m
w W W w Ot w w W W m w W W W w W w w W W w W W w w m
e A A n r A n r r A n n n n n n n n n n A r n A A n r A
L�
Cw n n r n n n n n n A A n r r n n n n n n n n n n n n n
W W w m W w w w W w W W w w m m W w W W w w W W w W W
N N N N N N N N N N N N N N N N N
C •
y V O C T
t°�a`N33o y
m w m n O Q A N m W W A Q O n w W w w o N m m
O N Q w 0 O N N n O N Q w m O N Q N A 0 O 17 w w n
0 0 Q N 0N N W N N` W O m w N Q 0 P P O n m P w
0 0 0 N N m W 0 Q N O O' t0 A N w 0 0, P N N w 0 O
m ? ? T � '? t7 CI � ? CI t+l M t7 (V N N N N N
O N CI Q N N W A 0 W m O W N n N n M W N W N W W t�
N P h W w 0 O N
W W Q W
0 W W 0_ O 0 0 0 0 N N N N m W l7 W
N N N N N N N N N N N N N N N N N N N
z'
w 0 0 0 n 0 O O O W A m O w 0 0 N A 0 Q N
Q 0 0 0 N Q 0 T Ol ^ (p 0 O r (7 Q fG h W O N Q w 0 O N
w m 0 0 O N P h W ' N 0 O N P 0 0 O m N n
0 0 W W W O O O O O N N N N N w W 17 m w Q@ Q
N N N N N N N N N N N N N N N N N N N N N N
P m N m 0 N N � N w Q 0 r w w P A m N N m N P � w N O r
P
N O O r h Q Q W A A 0 n N w n W 0 m Q 0 P
m w W m 0 0 N w w N O r N N W N P N N h 10 l7 n O N
L m W m 0 m 0 n n A A n n w 0 w Q t7 m W w P N n W O N
W
6
W N N O N m w N N w 0 N 0 N 0 N A N m N n m O O
w Q N N w 0 0 w 0 0 w w N
O N Nm
O O O O N O O N O N N N N O N O N N O O O O
Q N w n 0 W W O O O n Q O 0 W n N W n 0 N Q w N
P m O N V f0 0 r Cj IA (p t O N- C o n Q.
W w W W O N Q A w w w f W O N Q W 0 O m N h W P W
0 W W w 0 0 0 0 0 O N N N N N w w w w PP P
N N N N N N N N N N N N N N N N N N N N N N
I
w
IN
a
O O m M n n Q O P m b M N N M P W M O n M b
N N N t7 Oj V1 N � •- N N N N N N N N N N N W Cj Cj N M M N
W�
J O
O �
m O n Q b m P n M P M p i n m p Q N O m m N O O
W O Q N O W m O n W P M m d N 1p n n N m b N 0 O N
m m W N N N m M Imp frp W n n n m b b W�� 0 0 O VI b W N
W
P n P M
Ih n m m 0 O W m m m M W^ M O W W O n n b
p1 W W W W W W W m W W m W m n A n n nW W m m N b b Q
£e r n n n n n n n n n n n n n n n n n n n n n n n n n n
S K v 6 v 6 v 6 6 e 6 d e 6 o e 6 v v v p 6 a e 6 v d 6 a
a n A A A n n wn n n n n n n n n n n n n n n n n n�
W W W W W W W W W W W W W W W W W W W W W W W W m
`j b W N N N N N N N N N N b m m N N m b N N m N b m N N
W A W M N n M Q P N m W m b W N m M W M W
N W N
n m m of N Q Io m e vi m o m of Io 0 6 m vi r m '
N N N N M M M R p Y] m VI m m b h m
O n e Q a m In m e m M o n m w N ip o m m o n e ws ry m
N I? q N IQ n m
b W m O M N W W W^^ W W W O O W N O N P A W Ip W
m m p M O W N N W A N m P A N A N N W W A p W W m
fO b O N P It) A m' O � Vj P 1� b O] r lV V 1(1 W A G Ef •- A '
M W m O N N W W W m A W W b W O N p m W O N 10
Q P Q P b m m b W W m W fp A A A n W W W m W W W W W
a N N N N N N N N N N N N N N N N N N N N N N N N N N N
O W m m M O m N m N W N p A m O b m ry W M O
m O N p A N M b n O N p m W O N N n W
N W W n A W
p b N N N b m W W n n n n n W W W W W W W W W W O
N N N N N N N N N N Oj
Q N b P n n A Ip N VI O m n M n n m N m M Ip W W m m P
m W tG N 0 Vi 6 N N N [i 17 p N N VI N< V t7 N
W
N
P W P A Q W M m m m m m m N W m M m W Q W
O b VI m W O O O O O O O O O O O O O O W O O O N b b
O W W W M W P O W ry n N W N W N W n p W M m W
Q fO n W M^ m m O M y W m W W b m m O M m N
P m m b b m m W m m n n n n A 1p m W m m W 0 W W W O O
(V N N N N N N (V N N (V N N N N (V N N n Ol
f
a
m
O
i7
0
N
m
b A
P P
m N m
W
O N
W
Q
W
M
m
W
N P
n m
W
m
n
ry
n 0
m n W
N m
W
m
O
M
m
W N
W W
P
N N
M
A
M m N
0
W
a
O O m M n n Q O P m b M N N M P W M O n M b
N N N t7 Oj V1 N � •- N N N N N N N N N N N W Cj Cj N M M N
W�
J O
O �
m O n Q b m P n M P M p i n m p Q N O m m N O O
W O Q N O W m O n W P M m d N 1p n n N m b N 0 O N
m m W N N N m M Imp frp W n n n m b b W�� 0 0 O VI b W N
W
P n P M
Ih n m m 0 O W m m m M W^ M O W W O n n b
p1 W W W W W W W m W W m W m n A n n nW W m m N b b Q
£e r n n n n n n n n n n n n n n n n n n n n n n n n n n
S K v 6 v 6 v 6 6 e 6 d e 6 o e 6 v v v p 6 a e 6 v d 6 a
a n A A A n n wn n n n n n n n n n n n n n n n n n�
W W W W W W W W W W W W W W W W W W W W W W W W m
`j b W N N N N N N N N N N b m m N N m b N N m N b m N N
W A W M N n M Q P N m W m b W N m M W M W
N W N
n m m of N Q Io m e vi m o m of Io 0 6 m vi r m '
N N N N M M M R p Y] m VI m m b h m
O n e Q a m In m e m M o n m w N ip o m m o n e ws ry m
N I? q N IQ n m
b W m O M N W W W^^ W W W O O W N O N P A W Ip W
m m p M O W N N W A N m P A N A N N W W A p W W m
fO b O N P It) A m' O � Vj P 1� b O] r lV V 1(1 W A G Ef •- A '
M W m O N N W W W m A W W b W O N p m W O N 10
Q P Q P b m m b W W m W fp A A A n W W W m W W W W W
a N N N N N N N N N N N N N N N N N N N N N N N N N N N
O W m m M O m N m N W N p A m O b m ry W M O
m O N p A N M b n O N p m W O N N n W
N W W n A W
p b N N N b m W W n n n n n W W W W W W W W W W O
N N N N N N N N N N Oj
Q N b P n n A Ip N VI O m n M n n m N m M Ip W W m m P
m W tG N 0 Vi 6 N N N [i 17 p N N VI N< V t7 N
W
N
P W P A Q W M m m m m m m N W m M m W Q W
O b VI m W O O O O O O O O O O O O O O W O O O N b b
O W W W M W P O W ry n N W N W N W n p W M m W
Q fO n W M^ m m O M y W m W W b m m O M m N
P m m b b m m W m m n n n n A 1p m W m m W 0 W W W O O
(V N N N N N N (V N N (V N N N N (V N N n Ol
f
a
m
O
i7
0
N
m
C
n
N
N
m
N
O
W
Q
N
W
m
P
W
m
r
W
N
W
N
N
O
r
m
m m
Q
r
Q
W
m
Q
N
O
y
W
m
m
N
r
N
W
m
N
W
N
N
m
m
m
m
N
N
W
O
m
N
N
W
r
m
o
A
Ya'
p1
Q
N
N
O
r
l+l
m
0^
m
m
m
w
m
m
r
m
m
w
m
m
P
N
al
r
lV
W
n
m
(7
m
w
P
m
r
r
m
m
P
m
N
m
O
m
,.ogz
n
r
O
�
m
m
'
m
O
N
P
r
W
m
P
m
W
m
P
t7
n
O
O
N
Oi
Ci
m
W
N
m
tri
py
O
Q
P
V
N
N
N
N
N
N
N
N
W
P
P
P
m
m
N
YI
m
m
m
N
1�
W
W
W
v
N
W
W
w
W
W
W
W
W
W
W
W
W
W
W
nW
W
W
W
W
W
W
C
=
m
N
N
m
m
m
m
N
m
m
N
N
N
m
m
I()
m
m
N
m
N
N
N
N
N
m
W
A O
n n
N N
U
P
NO
O
f
m
Of
w
m
P
r
N
N
O
N
O^
W
w
P
r
N
P
m
w
d
W
W
r
m
P
N
r
m
N
N
m
N
Q
O
m
P
r
W
m
m
m
C_
w
N
Cl
N
m
p
W
P
O
r
Z
N
N
(V
N
l7
OI
N
N
N
N
C]
lV
(V
{V
N
N
lV
N
l7
N
r
r
N
N
fV
�
O
N
aa
N
n@
N
w
N
tW0
@
N
N
m
W
W
F
W
O
N
m
O
N
nl
W
m
r
f
W
m
W
W
u]
W
n
r
m@
N
Ni
W
W.
N
W
N
O
n
N
r
W
O
Oi
W
N
n
ui
O
r
W
W
m
C
O
W
N
W
m
i 2 U1 O
W
0
m
0
vi
0
m
e7
of
N
ri
N
m
N
of
N
ni
W
ri
@@
W
ni
e
N
W
r7
W
of
W
N
w
ri
m
of
r
n
n
r
m
m
W
m
W
ri
W
W
� �
a7
W
of
N
N
m
iI
it
m m
A a
A A
z
N
r
m
m
W
N
P
P
m
N
N
r
P
m
N
N
N
r
O
r
m
m
O
m
N W
U y
O
N
0
17
ac
@
m
oc
10
m
YI
YI
fp
b
r
E N
W N
N
N
N
N
m
0
r
n
OO
t7
�
nm
ip
�
pm'
lV
m
P
0'
N
100
INO
1P0
fw0
I�
n
W
m
m
m
W
m
0
W
O
O
O
w -
C
n
N
N
m
O
W
N
O
W
Q
N
W
m
P
W
m
r
W
N
W
N
N
O
r
m
m m
Q
r
Q
W
m
Q
N
O
y
W
m
m
N
r
N
W
m
N
W
N
N
m
m
m
m
N
N
W
O
m
N
N
W
r
m
o
A
Ya'
p1
Q
N
N
n
N
W
W
O
W
W
A
m
W
r
10
m
Q
N
O
m
ry
1+l
Q
N
O
O
N
m
m
r
N
r
O
W
Q m
m
O
N
01
N
N
O
O
n
P
N
m
W
W
N
O
m
N
O
W
O
O
C
n
n
r
n
r
m
m
m
m
W
m
m
W
m
m
W
N
N
m
m
N
Q
Q
Q
P
Q
Q
0
O
Q
P
V
Q
Q
O
Q
Q
O
P
Q
Q
Q
Y
Q
O
Q
V
C
V
Ul
N C
W
W
W
W
W
W
W
W
w
W
W
W
W
W
W
W
W
W
W
W
nW
W
W
W
W
W
W
C
=
m
N
N
m
m
m
m
N
m
m
N
N
N
m
m
I()
m
m
N
m
N
N
N
N
N
m
W
A O
U
9 C y 0
N
r
O
N
W
w
W
N
O
Wm
r@
W
O
14f0
N
r
m
N
N
m
N
Q
N
m
m
Q
N
N
N
Q
m
N
m
n
W
N
Q
C_
N
Q
r
O
p
W
P
O
r
y
N
@
10
n
O
N
r
m
m
m
n
N
O
LL
V
10
N
YI
Y
O
O
1n0
N
0
N
n@
N
w
N
tW0
@
N
N
m
W
W
F
W
O
N
m
O
N
nl
W
m
r
f
W
m
W
W
u]
W
n
r
m@
N
Ni
W
W.
N
W
N
O
n
N
r
W
O
Oi
W
N
n
ui
O
r
W
W
m
C
O
W
N
W
m
i 2 U1 O
W
0
m
0
vi
0
m
e7
of
N
ri
N
m
N
of
N
ni
W
ri
@@
W
ni
e
N
W
r7
W
of
W
N
w
ri
m
of
r
n
n
r
m
m
W
m
W
ri
W
W
C
ow
0061330 N
O
d
W
W
r
N
m
W
O
O
r
n
N@
N
N
W@
r
m
W
m
@
W
W
W
W
r
O
Q
W
r
W
O
N
W
h
M
m@
N
NN
m@
O
O
m
r
W
n
N
W
Yr
r
(S1
N
m@
151
W
m
O
m
r
N
W
W
N
N
W
01
n
@
W
W
O
W
N
I�
W
m
m
W
W
r
N
O
n@
p
1.
W
W@
W
151
m
OI
W
(7
9'
Ul
N C
m Z
2
N
10
C_
LL
V
10
N
YI
Y
O
O
1n0
N
0
N
n@
N
w
N
tW0
@
N
N
m
W
W
F
W
O
N
m
O
N
nl
W
m
r
f
W
m
W
W
u]
W
n
r
m@
N
Ni
W
W.
N
W
N
O
n
N
r
W
O
Oi
W
N
n
ui
O
r
W
W
m
C
O
W
N
W
m
0
m
0
vi
0
m
e7
of
N
ri
N
m
N
of
N
ni
W
ri
@@
W
ni
e
N
W
r7
W
of
W
N
w
ri
m
of
r
n
n
r
m
m
W
m
W
ri
W
W
� �
a7
W
of
N
N
m
iI
it
N
V
N
QC O Q aa
0 N 4 N
r a
Z J J J J J
W m W N m N P N n m W W N @ N O W N N m m @ P
m N W m N O O N W N W O r O m m O n W N N W O N O W
m W O N@ m m W m m N W r N W N W N n O N m r W W W
n N O P m m m O Q m N N W N W O N r O P n O N m W N
G C m l+l Ol N Cl Cl CI N M [7 N CI Ol t'1 17 16 CI Cl 1h m N l7 Ol CI l7 Y
N
O O r N @ N N N m N O m e e O O N r e O N O m W
N N N@ m N N N N N m 1p @ N Ni N Ni Ni N N e e@ P W NI
e
m N O e r O P O m m m Ld m n W N m m@ n m N
n W O r Ol Q' IN r m m � lV m P Yf 6 r YI O N H l7 < Yf (p 1C
N N N N N N N N N N N N N N@@ Q@@@@ @ P
m N P N O W r m m n n r r m W N n O N@ n W
O r N N N N P@@ N m W W r r m m m W W O O N N
G C ai n of ei n N of n ni ei ri vi m n m ei ah a7 ri of ri a 6 6 v a d
i
m
b
@
O
ow
0061330 N
W m W N m N P N n m W W N @ N O W N N m m @ P
m N W m N O O N W N W O r O m m O n W N N W O N O W
m W O N@ m m W m m N W r N W N W N n O N m r W W W
n N O P m m m O Q m N N W N W O N r O P n O N m W N
G C m l+l Ol N Cl Cl CI N M [7 N CI Ol t'1 17 16 CI Cl 1h m N l7 Ol CI l7 Y
N
O O r N @ N N N m N O m e e O O N r e O N O m W
N N N@ m N N N N N m 1p @ N Ni N Ni Ni N N e e@ P W NI
e
m N O e r O P O m m m Ld m n W N m m@ n m N
n W O r Ol Q' IN r m m � lV m P Yf 6 r YI O N H l7 < Yf (p 1C
N N N N N N N N N N N N N N@@ Q@@@@ @ P
m N P N O W r m m n n r r m W N n O N@ n W
O r N N N N P@@ N m W W r r m m m W W O O N N
G C ai n of ei n N of n ni ei ri vi m n m ei ah a7 ri of ri a 6 6 v a d
i
m
b
@
O
a d
dC T
y a W
E o w v >
cd�a` m33 a m'
N N r m N ry ry N M O O N m � n Q N Q N fl m O O � Vl m N
� p
d, w
u �
J �
O
m W O O O W N W N W N Q O W W m m l7 W A W
m W m N W W P W W A P N O W m Q W W Q W m m m m m
m N W �O 1V OI m r 1� N W Q O W �
W O' m W W m W Q W W N P A W N Q A O N m A O N VI A
C N N N N l7 N W C! P V@ O m W N W W m m A A A A
b m W W W m W W W W m b W m W W m W W W W W W W m W W W
W
m Q W W W m m m n m N W CI W n m r W N W m m
W N m
W m m Q m m m m Q N W n W Q^ O W n m W m m m Q N
O O O m W W m W
e 6 v Y V R P Q P v 6 e 6 v a e o e e r v a I N ri m W
n A r n n n n n r n A n n n n A n n A n AW n r n r n
d m m W m m W m m W m W W m W m m W m m W m W m W W m
'j m m m m W N m m m N W N m m m m m m m m m N N m W N m
Q 10 O N m n O W m m O N Q Q Q n N r
m W m (O N mCj Ol Q g m O m O N In
Q n W N m A O N m n 0� m O W m m O l7 N m O W m m O
fO fO m n A n m m m m m W W O O O O N N N N W
W
Q Q P W N W O m mW N O O N N O m N W m m m m N
y
m (O Q N O m m m � N � O) m A !O m W N O
m A m O N P m r Wm� W m m m O N Q m r W Wm m m Am m W v� vi .n m T rd �d n � A r A n m m
m
o
3 �
w m m d o o m m m vi Q W P n N Q m W m m o N m
N W
W O O O p N N N tWJ pmj Q Q Q m m N O W A O W m W
Q Q P Q Q P v Q C Q Q P P Q P
� F
ry ry W m m W P a m m m r m n O v m m m N m m o m n
N A^ f^ m r m m O N W p Q m m ' m m 10 A m m m CI
P r O@ r O m m W N m m Q n p m m m N m
O O N N N W W m Q Q P Q m m m m m m m n n m m
O N W Q m r W p N M m m O N Q A m O O W W W W O
Q Q P Q Q O Q m m m m m m m m m W W W m r n m W m m n
E _
N ^
R
O m n M O O n m n m N m N n r m f W m O m m N O W
N W m W O m A n n p m m W W W N W Q P W N
m m m I!1 m m N Q @ p y N N m m m (p !C m m m 1n N m N m
Q P Q @ P Q P P Q P P Q P Q Q Q Q Q O Q Q Q Q P@ Q@
m m m m m m m m O O O O O O m O m m m O m O O
r N A W O W m m N m W n W W W O r N O W n O N@ m
L6 O @ W^ n W W n Q W m W N W O t7 n p r O
N_ l7 W Q P m m m m m A r m m W W W O O N N W W W P
C Q Q Q Q Q P Q Q P Q Q@ Q 0 p Q@ m N N m N m N m N m
W
a
W
m W
i
A
N
m
m
m
m
CI
r W 0
Q
N
O W
m
O
W
Q
W
n
r m
N
n
CI
W
W W r
A
W
ry m
m
A
m
W
W W
n
m
f
A
W
m O
N
W
(p
A m 6 m
W 0 �
(V
Cl
m
A
W
O
N
l7 Q
m
m
n
A
A
m m
m
W
W
W
W O O
O
w w
N N r m N ry ry N M O O N m � n Q N Q N fl m O O � Vl m N
� p
d, w
u �
J �
O
m W O O O W N W N W N Q O W W m m l7 W A W
m W m N W W P W W A P N O W m Q W W Q W m m m m m
m N W �O 1V OI m r 1� N W Q O W �
W O' m W W m W Q W W N P A W N Q A O N m A O N VI A
C N N N N l7 N W C! P V@ O m W N W W m m A A A A
b m W W W m W W W W m b W m W W m W W W W W W W m W W W
W
m Q W W W m m m n m N W CI W n m r W N W m m
W N m
W m m Q m m m m Q N W n W Q^ O W n m W m m m Q N
O O O m W W m W
e 6 v Y V R P Q P v 6 e 6 v a e o e e r v a I N ri m W
n A r n n n n n r n A n n n n A n n A n AW n r n r n
d m m W m m W m m W m W W m W m m W m m W m W m W W m
'j m m m m W N m m m N W N m m m m m m m m m N N m W N m
Q 10 O N m n O W m m O N Q Q Q n N r
m W m (O N mCj Ol Q g m O m O N In
Q n W N m A O N m n 0� m O W m m O l7 N m O W m m O
fO fO m n A n m m m m m W W O O O O N N N N W
W
Q Q P W N W O m mW N O O N N O m N W m m m m N
y
m (O Q N O m m m � N � O) m A !O m W N O
m A m O N P m r Wm� W m m m O N Q m r W Wm m m Am m W v� vi .n m T rd �d n � A r A n m m
m
o
3 �
w m m d o o m m m vi Q W P n N Q m W m m o N m
N W
W O O O p N N N tWJ pmj Q Q Q m m N O W A O W m W
Q Q P Q Q P v Q C Q Q P P Q P
� F
ry ry W m m W P a m m m r m n O v m m m N m m o m n
N A^ f^ m r m m O N W p Q m m ' m m 10 A m m m CI
P r O@ r O m m W N m m Q n p m m m N m
O O N N N W W m Q Q P Q m m m m m m m n n m m
O N W Q m r W p N M m m O N Q A m O O W W W W O
Q Q P Q Q O Q m m m m m m m m m W W W m r n m W m m n
E _
N ^
R
O m n M O O n m n m N m N n r m f W m O m m N O W
N W m W O m A n n p m m W W W N W Q P W N
m m m I!1 m m N Q @ p y N N m m m (p !C m m m 1n N m N m
Q P Q @ P Q P P Q P P Q P Q Q Q Q Q O Q Q Q Q P@ Q@
m m m m m m m m O O O O O O m O m m m O m O O
r N A W O W m m N m W n W W W O r N O W n O N@ m
L6 O @ W^ n W W n Q W m W N W O t7 n p r O
N_ l7 W Q P m m m m m A r m m W W W O O N N W W W P
C Q Q Q Q Q P Q Q P Q Q@ Q 0 p Q@ m N N m N m N m N m
W
a
m
001 C W m N
r m' Q b A mf N
N m A W 10
I� N M b
m
m^
m W W O O
O G O O O
m
1■��
W
b
U
d 0.�"
W 10 A n A
`-
O O O O O
m 0 m W W W W O O D
N N N
C O G
NN
N N N N N
N m m M
N N N N N
P
N
j
pm
�
b
N N
10
d
N
N
O N N h N
O M 0
A
N
b Q W
O W m m
O
a a z
a
p.
U
q d N
3 J j a
Q
m
A
O m N O Q
W m W O W
m b m
@ Q P N
pOj 0 0 N
yy
O O Q Q
W O W
N � dU U Y
N
O
m
M1 N IA N f0
N b h O N
ry A N W W
r b C O 0
b
N b O M
t7 Ih N tO O
m W M b
P m Cl A
W n W pA]
Vi O) Ci b N
!bO
10
= p
J
C m
0
W 0 0 W W
m
A O N P
W W O O O
n W N f
O O _
W Q m W
N N N N
W m
m M y
p
N
0 0 0 m
0 m W W W
W W O) W
W 0 0) 0) Vj
W W W 0j
W
W O c
J J f � WQ
ry
O W m W
ry
m
P
h W N b W
m O b
m m O W
N W W n A
M m M
O W m A m
A 0 M O
Cc 9
OI �
W n b M N
Qm
O m fm0 N m
m O
A p m f@O V
O O W h
N � W n N
m 0 0 m I
W O
ry
O
W
Z {7
m 0 m 0 m
t7 M m M Ol
W n A n A
M l7 Cl CI
1� W W W W
Pj pj
I0 W b b b
-
Cml m b
b b b Q@
P
Q
X. m
e w
m m m a m
m m W 16
lrj Ol M
w m m m m
Ol pl M Ol
m m m m m
17 Ol Cl Ol
w m m m a
m
'j b
N N N N N
b b m b b
b b b b b
N N N N N
Nb b b N
0
C V U W
9 C V d O
` C V
N
M 0 m N P
b m @
A b@ M b
Q P Q m
W Q M P
0 h W N W
O M' m
m P m@
W 0 M N
W m
Q
O W L 0 (J d
U d d LL' d
O
m
M
@ 0 m n
b A O N b
m M P
0 W CJ 1�
A W N N A
y 0 lV W Of
< 0 0
N
m h V W
m W W O
0
IN C6 fV fG
m b A O N
N
O
C m a
Q P
P P W W
O
d
O
O
N W W W
P m N A O
m A M m m
m W h A m
W W O O
0 W N P W
N m O m W
N O A m
A W W N W
A W P N
A
m
0N1
W 0 pmi O
O O
(O
C f^p W 0
N P b A W
M W h
O
O O
m
3
N
t0
C
IL
P
M
M 0 O b M
W Q O b N
0 A A W b
W W P m P
n W O A W
M
m Q W M
p
fp O
m
r
N
N 0 Q N
P n
IlI ID A m W
O m W W N
O N N O)
m W N 0
VMj
l7 Cl P P Q
b OWl N
V Q l+l Vj
r
W
0 m co W W
O O O N
N N N
to A m y@
w
V yNj y0j yj
p
W
d
Q b
z'
W
N 0 M W b
m O m n m
h A A M n
W M W m
0 A P b
P
W
0 0 � �- N
Vj O P b W
1� OJ O) O N
O r
'
0
W W W O O
Q@ b b
O
b b b b W
N N N M m
W W L6b b
m Q P Q
b W N 10 W
b b m W
1n W b b b
W
O
O N N tMl
N pO C N
N
N N V 0
N N M I!1
N n m O
Q
n
n n N
h n n
N n n n is
n � n h m
W
m m of m m
N
a ai a of o
E _
m
a
_
W
N
a
N
O
A O 0 m O
0 O W A b
m m M A
p Q ry W m
M (V O 0 O
O O P W
N m b h N
O
h O n N 0
N
P
@ Q V Q P
0 W
@ W ry m W
N
P P P P P
P P P@ Q
@ Q P P P
P Q@ P P
P
q
U
C a
O N
Z J J J J J
O
m
b Nb @ O 0 O W O
O
O O b O O
h 1� n W W
b ^ O
0 W b W
b W O O b
m 0 0 0 m
O O O O b
O A N A
O g
W d
h
Q
0 O Q 0
N b 0 W 0
M A W O
A n W 0 W
P 0 W
Q W M A
W
N b A O
m O@ 0
W 0 O P
N P
Q� b
W b 0 b W
N N N N N
W O O
IA b 1p Ip 0
0 0 W W 0
(O f0 1p 1p 1p
N
'ow
w o A o w m W 0 W m m ry m n m' P m m r o p m m W o
m N m N m W m m N P r N W m m W
O W l 1 I N O A
m m Oi N CI N tp m r t7 tG pi (V m OI fV 10 C V t0 O V N
P Q P N m m m m m r n r m m m W W W O O O N N N
Y N tV N N (V N tV N lV N N (V N N 1V lV N N t7 Ol t7 O1 M pj pj tj pj
N
W I(1 r W W m m P m
A m W O N6 m N (7 O m t7 Oi N r 1p � m 0 P m N W O P m C]
W W W n A r m m m W W W W W p p O O N N N N W
O� N N N N IA N N N N w m m N 1n m m m W W Ip Ip Ip fp (p (p m 16
W N N O m O m Q N n m m N W W m W O N W r n W m
n N Vj N C m N Oj O I� O O (p N m ty pI (rj r N W O m n Vj O
O m W W N P n O m m W W W m r^ W m
W m N W m m Ol m m
n r A n W m W W W W O O O O N N N m m m
m m m m W fU W m W (D fp W W W (O 10 m 1p W
m O r m O m O A N m W N O m O r N m N m m m m
m W n N P m m ry N N N N N Q m n 1� m m m N m W O
i
m W O O N m O t7 r m W N m n t7 m A r m A A m m
P P Q P P P P Q P m m m m m m m m m m m m m
m m m m m m m m m m O m O N m m m m O O m O O O O O O
W N W W m W A r W m O N m P Q P N W P W m P W P
O m r W Cj IN I� y N V 10 � O N Q fD m COf A m h T M r N
m m A r A m m W W O O O N N m m m Q P m m m m W n
is n
J
m
a
d
P
m
Y
:1
N
m
n
n
N
n
r
W
P
O
IA
N
W
m
Q
f0
10
N N
I
O
N
N
O
A
m
m
m
M
W
m
O
W
P
Q
N
A
N�
m
CWI �
C D
Cc
OI N
W
O
W
W
y y
P
P
f0
N
m
m
Wm
N
1 �
O
1p
Ol
m
m
m
W
W
W
m
m
m
i+f
r
m
m
n
N
N
N
n
Q
O
n
Q
N
W
N
O
O
N
W
O
n
O
h
C1
N
W
N
N
N
N
N
O
O
O
O
O
W
W
W
W
W m
W
W
W
w
W
m
m
m
m
m
m
W
N
N
N
N
N
W
W
w
W
> >
O
Q o
W
W
W
W
W
W
W
w
W
m
W
W
W
W
N
N
N
n M
�
N
m
W
v
n n
m m
�
a
Q y U
W
Cl
N
P
N
N
r
m
m
O
w
W
m
N
O
O
N
W
N m
A N
Z Q
m
O'
m
N
m
m
m
m
m
n
m
m
O
m
m
W'
m
�
m
n
m
W
m
N
O
p
Cf
W
m
ry
m
n
N
N
p
m
m
N
m
O
O
vi
r
W
f
NN
U
O
YI
O
Vl
O (O
Y
^C m
W Y@
m
W
N
p
w
m
N
N
b
N
N
n
N
r
n
0
m
0
0
N
N
N
N
N
N
N
N
N
J
E
a� ai
W
w
m
Ym]
10p
w
10p
A
W
0
W
W
O
O
O
O
n
n
W
r
of
n
W
W
ai
W
N
P
W
m
W
a
of
c
ai
W
of
a
m
W
w
m
o
0
0
0
0
3 N
2
W
W
PIQ
n
m
w
n
A
m
n
n
P
w
n
n
n
n
N
A
n
F
w
n
n
n
h
W
m
n
n
n
n
n
n
W I(1 r W W m m P m
A m W O N6 m N (7 O m t7 Oi N r 1p � m 0 P m N W O P m C]
W W W n A r m m m W W W W W p p O O N N N N W
O� N N N N IA N N N N w m m N 1n m m m W W Ip Ip Ip fp (p (p m 16
W N N O m O m Q N n m m N W W m W O N W r n W m
n N Vj N C m N Oj O I� O O (p N m ty pI (rj r N W O m n Vj O
O m W W N P n O m m W W W m r^ W m
W m N W m m Ol m m
n r A n W m W W W W O O O O N N N m m m
m m m m W fU W m W (D fp W W W (O 10 m 1p W
m O r m O m O A N m W N O m O r N m N m m m m
m W n N P m m ry N N N N N Q m n 1� m m m N m W O
i
m W O O N m O t7 r m W N m n t7 m A r m A A m m
P P Q P P P P Q P m m m m m m m m m m m m m
m m m m m m m m m m O m O N m m m m O O m O O O O O O
W N W W m W A r W m O N m P Q P N W P W m P W P
O m r W Cj IN I� y N V 10 � O N Q fD m COf A m h T M r N
m m A r A m m W W O O O N N m m m Q P m m m m W n
is n
J
m
a
d
P
m
Y
:1
N
m
n
n
N
n
r
W
P
O
IA
N
W
m
Q
f0
10
W
W
O
N
N
O
A
m
m
m
M
W
m
O
W
P
Q
N
A
N�
m
CWI �
C D
Cc
OI N
W
O
W
W
P
m
P
P
P
N
P
m
W
W
W
W
N
P
NO
((VV
Z-3
W
A
(G
m
l7
r
W
r
m
pp
N
O
w W
O
'N
C P
P
m
m
W
W
N
N
N
N
N
O
O
O
O
O
W
W
W
W
W m
W
W
W
w
W
m
m
m
m
m
m
W
N
N
N
N
N
W
W
w
W
W
W
w
W
W
W
W
W
W
W
w
W
m
W
W
W
W
N
N
N
N
N
N
m
W
v
Q y U
W
Cl
N
P
N
N
r
m
m
O
w
W
m
N
O
O
N
W
O
Q
W
m
w
O
m
w P
1�
�
N
f0
Ol
Cj
m
N
A
N
I�
N
n
N
YI
f
0
O
Ol
YI
O
Vl
O (O
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N N
W
m
W
W
r
P
m
W
W
n
m
N
P
N
P
n
1lI
w
n
W
m
r
r
P
A
m
P
m
O
P
m'
w
A
A
m
m
N
r
N
O
NP
m
m
W
O m
l0
b
N
P
A
P
W
PIQ
m
w
m
m
A
m
O
m
N
w
P
w
W
tO
m
w
O
A
m
n
N
A
n
r
F
w
n
Gl
w
N
P
w
h
W
m
r
m
W
O
W
N
m
w
P
m
W
IA
r m
W
W I(1 r W W m m P m
A m W O N6 m N (7 O m t7 Oi N r 1p � m 0 P m N W O P m C]
W W W n A r m m m W W W W W p p O O N N N N W
O� N N N N IA N N N N w m m N 1n m m m W W Ip Ip Ip fp (p (p m 16
W N N O m O m Q N n m m N W W m W O N W r n W m
n N Vj N C m N Oj O I� O O (p N m ty pI (rj r N W O m n Vj O
O m W W N P n O m m W W W m r^ W m
W m N W m m Ol m m
n r A n W m W W W W O O O O N N N m m m
m m m m W fU W m W (D fp W W W (O 10 m 1p W
m O r m O m O A N m W N O m O r N m N m m m m
m W n N P m m ry N N N N N Q m n 1� m m m N m W O
i
m W O O N m O t7 r m W N m n t7 m A r m A A m m
P P Q P P P P Q P m m m m m m m m m m m m m
m m m m m m m m m m O m O N m m m m O O m O O O O O O
W N W W m W A r W m O N m P Q P N W P W m P W P
O m r W Cj IN I� y N V 10 � O N Q fD m COf A m h T M r N
m m A r A m m W W O O O N N m m m Q P m m m m W n
is n
J
m
a
d
P
m
Y
:1
r
Oe
r
m
N O
N IOp
W m
m Q
Q
Q
p
m
m
N
�
m
N
N
M
r Q
P
M
n
m m
W
O
m
m
N p
M
m
N
m
n O
n N
M
D i r
n n
is n n m
N�
n
N
N
N
N N
N
m
n
m
Q
0 O
n
N OI
M m
b
W
N
n
N
m
N
O
p ry
n
W'
N
n
Q
p
M m
n
N
0
N
O
M
y M
Ol
m
Cl
Q
[7
Q
17
Q m
Ol
m
m
m
m
m n
n n
n
m
m
m
m
m W
W
W
W
W
W
W
N P
O O
n
O
O
N w
CI
th
Cl
CI
Cl
t7 t7
Ol tti
t7
tti
Cf
t+l t7
M
t7
C]
Q Q
P
Q
Gm
m CPj Q m m l+l n m m m P M m W O N r N M m m O m
O C O N N X 0 0 0 �- N N S •- r •- N N O
m�
J m
0 �
m N A m m A W m A m P m m^n n m N m m W m W m
O Q W n W m m' A W m N W p m m m m M W m O Q o
A O N P m A W m m W M O m O m m m Q m M m N
m N m Q O m m m O m W W m O M m W N Q m m W N M
O ry y A W N p m N M m A W N Q m
N m m m m m A A A
F o 0 0 0 0 0 0 0 0 0 o w 0 0 0 0 6 o c o c o c w o 0 0
W
M1 Onl N O m A m N M m p M W W W p m N N m Q
i P m Q O w M M A m m w M1 N OI w w w
CI m M W n m M W M1 m M N O m
C N m M w m m M O m
w m r n n n r m w (p w w m m m
N N N N N N N N N N N N N N N N N N N N N N N N N N
Lo w 16 W W W W w W m W W w W w W W W W W w w W W
'j m m m N m m m m m m N N N N N m m m m h m m W N Y]
P M W m m m O N m m a o n m r m m m m m m m o N
O A M O m m m O N M N m m m m W Q m m M1 M n n m N
ry A vi of d m 6 a vi n vi m E n o m vi n ai f o h P
Q m W Q m m Q m W m m m O M m n W {y
m m IO n F A M1 0 m m m W W m m O O O O O N N N
N N N N N N N N N N N N N N N ll Oj 16 pj M Cj M' pj M M
—
O m W m M1� m O W m m f m m' m P O m m m O W M a
N M Q m m N r W N M 8 O N' m N N m m W m N m N m
m
N p IO N O N' m m O N P W m O N M m n W O N p n d N
a O O O O N N N N N m W M M M Q p P Q Q P
y G N N N N N N N N N N N N N N N N N N N N N N N N N N N
3 �
a
m ..
iia` w33o y
o m m m A m m m m o M1 W n M n r m N m W N m r
Y m m p< l7 n n OI M W N N N N N p W m
m O p m p O m M W m l7 C A p N O W n n' n A m W O
O M m n O M m m O M m m p n O N m m p n O M n O m
p p p p m m m m m m m m n n n m m m m W W W O O O
GQ m n p m N f
p Q m n m m O m n m m O r y P 1� W N p m p m m
W pf OI 0 ai Of ai o C W O) W OI m m n n n n h m aC m m m m m
YJ S
E _
x
w —
N O N m m N m m m M n m M1 r M m m m P W N W n
W
N O
N IOp
W m
m Q
Q
Q
p
m
m
N
p N
m
N
N
M
r Q
P
M
n
m m
m W m O
O
O
N
N
Nm
M
D i r
n n
is n n m
m
n
O m
N
n
N
A
N
h
M
Oi '
(V
Oi
tp
t7
OO
n �(1
t7
N
O
W
pi Oi
O
G
y
w
CI
fU
�
fc
m
ro
m
fe
m ro
w
ro
w
e
m
Gm
m
fu
m
ro
a
fu
� fu
m
e
m
n n
n
a
z=
I
a
m ..
iia` w33o y
o m m m A m m m m o M1 W n M n r m N m W N m r
Y m m p< l7 n n OI M W N N N N N p W m
m O p m p O m M W m l7 C A p N O W n n' n A m W O
O M m n O M m m O M m m p n O N m m p n O M n O m
p p p p m m m m m m m m n n n m m m m W W W O O O
GQ m n p m N f
p Q m n m m O m n m m O r y P 1� W N p m p m m
W pf OI 0 ai Of ai o C W O) W OI m m n n n n h m aC m m m m m
YJ S
E _
x
w —
N O N m m N m m m M n m M1 r M m m m P W N W n
W
N O
N IOp
W m
m Q
O
m
m
m.
m O
m
m O
m
m
O
m
n
m m
m W m O
O
O
N
N
Nm
M
D i r
n n
is n n m
m
m m
m oc
m
m
M
oc
p
m
P
oc
m m
m m
w
m
w m
ac m
m
m
m
m
w
m
2
•` mg
lz
m
N
N
W r
m
N Imy
m
N
m
m
m
W N
^
n
n
N
m
0 N
r
m m
0 6
N
P
6
O
m
Q
v
j O
P
W
Q
6
m
N
N
N n
P
m
W
N
m M
m
m
n
m
W �
0 N
r
m m
0 6
N
P
6
O
m
Q
v
j O
P
W
Q
6
N
m
W
v
p
m
W
6
O �
W
n
m
a
1m
m
n
6
IN P
W V
n m
6 v
m
N
N
N n
P
I
O
P
A
N
n
W
W
w
o$
m
m
n
m
o
0 N
r
m m
0 6
N
P
6
O
m
Q
v
m
n
P
6
P
W
Q
6
N
m
W
v
p
m
W
6
N O
n
m m
v v
W
n
m
a
1m
m
n
6
IN P
W V
n m
6 v
N
O
W
6
m0 N
N
m o
e vi
m
N
N
N n
P
W
O
P
A
N
n
W
W
w
o$
m
m
n
m
o
Q
P
m
P
m
m
m
W
e
w
Irj m
ry
r
a
r
m
W
m m
o
m
m
p
o
m
P
m
W
N
W
w
C6
m
A
N
m
m
O
A
Q
N6
P
m
m
O
P
OI
Q
W
P
r
N
A
m
r�
N
m
A
m O
m
m
m
m
m
m
mo
a W
A
O A N
W
m
m
O
n
O W W m Q P
�!.
m
"�
W
W Ol
r m
6N
m
O W
p,
W
P
P
W
P
0
0
W
m
m
q Oj A W
n m Wm O N Ol
T
N
Ihy
lmy
W
O
Ej
.yci Oi
`C
m Oi
Oi
m W
Oi
Oi
Oi Oi W C O O
O
l,♦�
c .. ..
ny
f o
F
Y
e
e
e
.
E a a
W
m
N
N
N n
P
W
O
P
A
N
n
W
W
N
m
m
m W
N
N
N
A
W
W m
W
C
A
m
W
m
P
m
N W
N
mci
m
C
CI
Irj m
c A
r
a
m
w
m m
=
W
N
m
W m
a A
N
ri
m
of
m
Qm
Y a
m
ri
ni
v 6
N
W
m
N W
56
N
N
W
N
N W
m m
m
N
N
N n
P
W
O
P
A
N
n
W
W
6 n
m W
O
N
N
N
mF N
W
N
N
N
N O
m
N N
3
VI
m
m
0
N
m
N
O
o
P N
O O
N N
m w
m m
O m
C P
N
N
h
N
m
N
m
m
C
CI
Irj m
c A
r
r
A n
m m
(p m
O 1�
N N
N N
n n
W W
N N
N m
N
P
n
NQ
N
n
W
m
W
O
P
A
N
n
W
W
6 n
m W
O
N
N
r
m
N
m
m
o
O
0
C's
m
m
O
m
m
0
N
m
N
N
m
A
0
N
m
W
VI
m
m
0
N
m
N
O
o
P N
O O
N N
m w
m m
O m
C P
N
N
P
N
m
N
m
i6
m
m
m
m
W
r
E —
m
m
m
W
m
N
0
m N
O
N
of
m
vi
m
a A
N
ri
m
of
m
Qm
Y a
m
ri
ni
v 6
f
O 0 LA
z J J J
56
�
M m
tr'i
tWI
�
V —
m c o
m m
(p m
O 1�
N N
N N
n n
W W
N N
m
W
N
N
N
rr
w
m
m
O
N
N.
W
N
P
n
NQ
N
n
W
m
r
m
W
(V
0
W
N
O
P
A
N
n
W
W
O
o
m
m
_
N
n
m
N
m
P
N
r
m
m
W
m
m
N
h
w
m
m
y
m
'
N
n
W
m
m
o
O
0
C's
m
m
O
m
m
0
N
m
N
N
m
A
0
N
m
W
VI
m
m
0
N
m
N
O
o
P N
O O
N N
m w
m m
O m
C P
N
N
P
N
m
N
m
i6
m
m
fm0
m
6
m
m
W
r
P
m
m
m
m
W
m
N
0
m N
O
m n
of
m
vi
m
vi
ri
m
of
m
m
m
ri
ni
v 6
m P O r m Q m C A COl Q N N m n
m W W O N N pm m m m '
N O
m m m r A n n n n n n m m m m m m
N N N N N N N N14 N N N N N N N N
W (7 O Imo O N Q N b fml N w f0 m m m
P Q m
W N A m W A O P
Q m m m m O m N O r p m W N O
m P Q Q b W t0 W m A A m W W O N
n r n n A r A n A A n A n A m m m
m m W P m m m N n P W m m P m
Q N N m t0 m m n n W W O N
P P N W m m m O m m N P W O
m r pi 0 {p P Ol Cl M O I� V Ol Q m V V
P W N N N N N N N W P A p m W
W O W W
m P Q P Q P P Y P P P P P P Q P V
m
W
a"
w
E
E
EE
A �-
'H
'jl
'H
O 0 LA
z J J J
Q
r
ci
OW
a W
A
O A N
W
m
W
O
n
O W W m Q P
�!.
6N
m
O W
p,
W
P
P
W
P
W W
N m
W m
N
N
W
m
m
q Oj A W
n m Wm O N Ol
T
m
p N
a W
W
O
Ej
.yci Oi
`C
m Oi
Oi
m W
Oi
Oi
Oi Oi W C O O
O
l,♦�
c .. ..
ny
f o
F
Y
e
e
e
.
E a a
m
W
a"
MOO
VA
P O N
W
N
Q m` W ;:N m
m'
1� N m A N
m
W w W P m
Op W N
O m P
N O (p
m P O P N
P W N N Q
Q m
N
Q N N
O
m
D
O
m N N N
N N m m V
N N N N N
Q y p N N
N 1 W m 00
W N
m A A A W
P
m W W m
\��
U! d
N N N N N
N N N N N
N N N N N
N N N N
m
�
O
N
Q m
P m
W m
m N m O
m
Cow
cmi �❑
m m a
d
N W v U y
O pj
P N I� Cj r
N IM1
LO
t2N
O r tm0
NN
{rj O m
N m 0
N m W N O
m m Q
A N W P
J
NN N N m
m m P Q
O O N VPi
lV tV
N N (y
ry (y N N N
N N N N N
N N N N N
ry (y N N
d� N > C❑
A A A
A A A A A
A A A A A
A A A h A
A A A A A
A A A A
W_
A N O
Oml Omf P W
P W N M
N 0 N 0 O
0 'O m N
O O
V
C a
m m O
o O N
W m O W m
W w w W 0
A O m
0 W W 0
O m
m m b m
li
A N N
r n
O Cmt
W N
n n r
m.3 Am
y d
o?mmm
mmwmm
mmmmm
mmmmm
mmmmm
mmmm_
'.3
O
V C p1
^ N N
A N b W N
A m A m W
A N m w A
m A
` CW
d 0
m
N m
A A W m
P N m N O
O O m Q
m N N
W N A N m
6
A
O C6 N (p W
N P P m
O N
O W d U h
m W
m A W P
fp A O N p
N (pp N
A W Q A
W m
W N N A O
m N W O
W w W O
o >> O
W J
J F i Z N G
C
O
d
A O
O N N
m m W
N W O
O W P N
A P m m O
N O O f
W W A m
N P m mW
w m W
w w W w W
o m o
m
d m
Yl C N N N
N N N N N
m o
N M {7 N w
0 0 0 0
(h � CI t7
N N Cf M lel
N N N N
N l7 f7
pl
N
II
m
c
LL
m A
O W
w N O N
P N N W
m m b W
W O m m
O N A m
W m N N N
O O A m
P tp A N m
W W
P A m O
N m O
Q N m m A
A A A
fV N O
A m
W m m W m
W m W m W
W w W w
o
it
m O
O m N P
W m W m N
W w W N
mm m
N N O
W O W O
AN14
P p m
W
m O m
m P Q
m
N m N N` A W
N b A
O Q P O
A W m N A
m W m W
m W m m
b O N m
W W
m P O Q m
P N m m W
W W K
m A W b
W
m W J W Oj
m m m W m
W w m
W m ai m W
w W W W W
m W W m W
w W w W
m W m W
W A
N W A O N
b N m m
N m N m N
W m W W W
{ O O O
'O-
P
m- m W
N m
m m W
Q m A
S
-
--
E _
- -
a
w
N
s
W W N
m m
N A A A N
W ry O N m
N P N A
m P O m Q
w W Q O
U
Q P P
P Q Q P P
N N
P Q N N
w N W O th
N W m A A
N m N N
A A m W m
m O N Q
W w W
d
C
O
Q C a Q I
L O b N N N
C a ❑
o d
i J J J J J
N W m
N m W A
N m N
m N
O N N
6
IWO 0 001 W
N ri W W
O O m
N y N
O b w
N N N N
W N w O N
m W m N N
P N A N
m y
N
Q
�L
- O O O
O
m m P Q
Q N N
N
I
,■�
Orf
0 0 0 0
P
N P of N
Q y m N m
O 0 m r W
r A w N P
N' m m N
' N N P Q
O W m n
P
m
D
U
d b
N
m m m m W
N m Q N
m w m m m
fp m r m W
m m m W m
p N m P
A r n r n
m m m n m
r r n r n
W
r
j
m
U!
' J
o�
O
n n
N N
N
y y
d
O
P
N W W Q m
W m P N
m N w
w N r m
m
WN m h
O N 0 ONE r
N m m m
rm
�
Qa
a a z
m
r n m r m
m N N O NiN
(V N
Cl th Cj ry O
C
U
m m �
� � d
N N i
Q
N w Q N O
Q m f0 P O
m
J J J
V
0
N m N www
N
m N r m
Q m N b N
CPf n O tbD W
b
W W N
P m f0
N !� O IN
m OO t0 fV Oi
Oi J N YI 1p
Q j Oj (p
r
N
0
w
NO
N N
w
m r m m W
W O O
N m m Q N
b m m r r
m
N N N
N N N N N
N N N N N
16
N N N N N
n
m
N N N N N
r
N
r n r r
n
r
Ol
P
O w N m
m h O m W
Q W O w N
m m m
r P N r m
m mC N P N
W m m O N
N r W W m
W N r r W
r N m W
m O m Q N
m
y m m m Q
p N f0 m N
N
V
m
N O w N
m N r O N
N
N w Omj m
Q N r
m N N m m
O ry N N w
W N m C w
m
N
P m m ry
O O W m
n 1� m N YOI
O m N
O
w
W m m m W
W
p O
O O O O O
O O O O O
O
W W m W
w W w W W
w W m w w
w W m W W
W
d
d .2
I
N
P
W O Q P Q
b
n
d U W
W
O
P N N
0 0 0 L6O
N r W O m
N
01 y m N 1�
r N m m
Y {rj Q m
W N A m
m
O
U
d
N
N
N N m m
P Q N N W
m n m m W
m P w P
w p O
N
S
q
U G Q C Z r
N N N N
N N N m N
mi N N N N
N N N N N
N W fD fp m
f6
>
J N O
WSo
r
O
O.
W
N
m
w m Q N
r m m m O
m A
it
m
O N N m w
N W r N N
Om A N O
m N
P 1d N
N N m N
m
Q
N
m m m m
Q P N W n
W W O
N W r
N m P
P N O m m
N m r n m
Q
W
d m
W C `?
m T a? m n
I f n rf n. m
ri ri r;i Y Y
Y Y Y Y Y
Y 9 Y Y Y
Y
3
w
C_
lL
NQ
O P m m Nm
N
O Q O N r
N
N' m'
N w m W
N W �-
A
W
O
V O N O N
w qW m b n
O N w m
O N IF IA h
r N m
Q A N
n h Q) � O
m m N m
T V h C'l OO
`^ m N
N (V (V w Q
g
W
m
b
b
m b ti m b
w
m m
r N m N
O O O N
N N N N N
r r n r
n
d
N
ao m�
m b eo m m
m m m b m
b m m 0 b
m
a
z=
n
m r
a m W m
N m N o N
m m m m o
m o W m W
r Q m Q
w
Q is m n
v a m v
N
W
N r N
w m m
n N P N
Q N N n
N Q O r
Q W O f0 r
m
W w
m m m
w m w m m
m m m n r
n r r n r
n A m n n
r
G g ai
z=
of of
m m m is m
m m m of m
m co m ai m
m W m ai m
w
N r O
N N m
N Q Q P
m m N W
O r m m w
w
L NC'
E _
a
w
m
H
N
g
m
Q N w f w
m Q W W w
W r W w r
W O P W
Q P
m b w
o�
o
6
`m m m m m
W O
m m m m w
of
Z-1
o
G
�
ory cg-�
€aJ
O N N
J J '79
Z J J
w
N m Q w
m N N r m
w r Q w N
w NO Q
O m r N
Q
r
a
O
N P w W
m m m � r
mm r
N N w G
r w m N
n w m A Ni
Q m N'
A w N
O
b
Q
w w n F A
r m m _ O
N m Q N w
r m W O
p O W
N m P N N
w
w
N
.N-
N w .N-
li 16 M
m
n
w a
���
E r N
O
U 4
o
■ ■
NNW
}\\\\
z::�:�
cq
m�
((
-
00
E
`
�
}
j)]
7k�il.
ID
)!
z::�:�
cq
-
E
`
�
}
j)]
z::�:�
-
�
■ I
`W;
]18800
]18200 N'
]1]900
717600-
717300
]17000 \
]16I00,�',
%6400
]161 W Y
]15800 /-
]15500
0009
O
a
r
Northing (300 us£tlin)
a
s
%11
m$
cx'
p o 0
000 0 J
� o
a 2
R.
726300
]26000
n � g
]25]00
]26300
725400
726000
]25100
]25]00
]24800
]25400'
724500
]251001
]24200
!
]248001;`
]23900
p
]245001-
]23600
p}r
]242001.
O
]22]00
V
723900-'
>22400
pa
!U
Q¢---
]23600
M
-
.721800
H
SII
721500
N
]23300]
,]21200
--
C
720900S
C O
:A
723000J'
- `720300 W
pn
]22]00-
720000
O
722400,
600 -
-
]221001'
a
]19100
-
n r�
0008
�\e:%
7218001
]1]600
]1]300
]1]000
a 7212001.
0001..
]18800
]18200 N'
]1]900
717600-
717300
]17000 \
]16I00,�',
%6400
]161 W Y
]15800 /-
]15500
0009
O
a
r
Northing (300 us£tlin)
a
s
%11
m$
cx'
p o 0
000 0 J
� o
a 2
R.
726300
]26000
]25]00
725400
]25100
Q
]24800
724500
]24200
!
/
]23900
p
]23600
]23300
'.]23000
O
]22]00
>22400
pa
!U
]22100
M
.721800
H
SII
721500
u pp p
,]21200
m
C
720900S
C O
m
720600 C
II I`�I
LL ^
- `720300 W
pn
720000
O
-[[[[]19]00
'^ F]19400
�n
a
]19100
718800
n r�
716500
�\e:%
]18200
]17900
]1]600
]1]300
]1]000
]16]00
4'-]16400
]16100 n
Y
`
o
1]15800 E
F]15500
I
Obp
North America - ALASKA - BP
Lisburne
Lis DS 05
L5-12
L5 -12A
L5 -12A
AOGCC Post Drilling Offset Report
22 August, 2016
rigs
BAKER
HUGHES
/�OOGCC OFFSET REPORT
b BP I/.&6
Z� p Anticollision Report BAKEEt
` HUMES
Company:
North America - ALASKA - BP
Project:
Lisburne
Reference Site:
Lis DS 05
Site Error:
0.0ousft
Reference Well:
1-512
Well Error:
0.00usft
Reference Wellbore
L5 -12A
Reference Design:
1-5-12A
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output effors are at
Database:
Offset TVD Reference:
Well L5-12
L5 -12A (actual) @ 67.35usft (Parker 272)
15-1 2A (actual) @ 67.35usft (Parker 272)
True
Minimum Curvature
1.00 sigma
EDM RSK - Alaska PROD - ANCP1
Offset Datum
Reference
1.5-12A
Fitter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program
From
(usft)
57.35
8,940.00
10,983.37
Date 8/22/2016
To
(usft( Survey (Wellbore) Tool Name Description
8,911.10 1 : Schlumberger GCT multishot (L5-12) GCT -MS Schlumberger GCT multishm
10,907.68 BHI ATK MWD 81/2"(L5 -12A) MWD+IFR+MS-WOCA MWD + FIR +Multi Station W/O Crustal
13,881.27 BHI ATK MWD 6-1/8"(1-5-12A) MWD+IFR+MS-WOCA MWD + IFR +Mufti Station W/O Crustal
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft(
(usft)
(usft)
(usft)
Lis DS 05
1-5-01 - 1-5-01 - LS01
3,128.67
3,125.00
342.67
60.64
282.03
Pass - Major Risk
1-5-04 -1-5-04 - 1-5-04
2,230.24
2,225.00
244.08
36.63
207.45
Pass - Major Risk
LS05 - 1-5-05 - L5-05
2,029.92
2,025.00
275.28
38.80
236.48
Pass - Major Risk
L5-08 - 1-5-08 - L5-08
2,206.61
2,200.00
113.40
37.34
76.06
Pass - Major Risk
1-5-09 - L5-09 - 1-5-09
738.12
725.00
199.07
16.08
183.00
Pass - Major Risk
1-5-12-1-5-12-LS12
9,231.35
9,225.00
14.07
8.67
6.12
Pass - Major Risk
1-5-13 - 1-5-13. 1-5-13
2,340.11
2,325.00
183.10
40.51
142.60
Pass - Major Risk
1-5-15 - L5-15 - 1-5-15
587.47
575.00
195.47
13.06
182.41
Pecs - Major Risk
1-5.15-LS-15PBI-L5-15PB1
587.47
575.00
195.47
13.08
182AII
Pass - Major Risk
L5-16 - LS -16 - 1-5-16
2,107.75
2,100.00
118.02
38.06
79.96
Pass - Major Risk
1 -5 -16 -L5 -16A -L5 -16A
2,107.75
2,100.00
118.02
38.06
79.96
Pass - Major Risk
LS16--5-16A- Plan #2
2,107.75
2,100.00
118.02
38.06
79.96
Pass -Major Risk
L5-16-L5-16AL1-L5-16AL1
2,107.75
2,100.00
118.02
38.06
79.96
Pass - Major Risk
L5.16--5-16AL1 PB1-L5-16ALl P131
2,107.75
2,100.00
118.02
38.06
79.96
Pass - Major Risk
1-5-16-L5-76AL2-L5-16AL2
2,107.75
2,100.00
118.02
38.06
79.96
Pass - Major Risk
1-5-16 - L5-16AL2 - Plan #2
2,107.75
2,100.00
118.02
38.06
79.96
Pass - Major Risk
L&77 - 15-17 - L5-17
2,431.19
2,425.00
218.94
46.40
172.55
Pass - Major Risk
1-5-17 - 15-17A - 15-17A
2,431.19
2,425.00
218.94
46.40
172.55
Pass - Major Risk
1-5-18 - L5-18 - L5-18
1,111.60
1,100.00
181.06
24.09
156.97
Pass - Major Risk
1-5-19 - 1-5-19 -1 5-19
587.11
575.00
274.07
16.43
257.64
Pass - Major Risk
1-5-21 - 1-5-21 - 1-5-21
2,008.13
2,000.00
323.44
35.81
287.63
Pass - Major Risk
L5-23 - 1-5-23 -1-5-23
661.57
650.00
373.88
12.65
361.23
Pass - Major Risk
1-5-24 - L5-24 - LS -24
2,436.14
2,425.00
357.43
44.84
312.60
Pass - Major Risk
1-5-25 - L5-25 - 1-525
711.06
700.00
430.85
18.87
411.98
Pass - Major Risk
LS -26 - 1-5-26 -1-5-26
2,409.97
2,400.00
427.57
40.52
387.04
Pass - Major Risk
1-5-26-L5-26PB7-L5-26PB1
2,409.97
2,400.00
427.57
40.52
387.04
Pass - Major Risk
L5-26-L5-26PB2-L5-26PB2
2,409.97
2,400.00
427.57
40.52
387.04
Pass -Major Risk
LS -26 --5-26PB3 - -5-26P83
2,409.97
2,400.00
427.57
40.52
387.04
Pass- Major Risk
1-5-28 - 1-5-28 - LS28
2,383.64
2,375.00
476.82
39.75
437.07
Pass - Major Risk
L5 -28 -1 -5 -28A -L5 -28A
2,383.64
2,375.00
476.82
39.75
437.07
Pass -Major Risk
1-5-28 - 1-5-28A - Plan #1
2,383.64
2,375.00
476.82
39.64
437.18
Pass - Major Risk
1-5-28- L5-28AL1-1-S28AL1
2,383.64
2,375.00
476.82
39.75
437.07
Pass - Major Risk
LS -28 --5-28AL1 - Plan #3
2,383.64
2,375.00
476.82
39.64
437.18
Pass - Major Risk
8/22/2016 3:41: 20PM
0
COMPASS 50001 Build 81B
♦ by Anticolli Bon Report BAKER
S°"e HUGHES
Company:
North Amanca- ALASKA - BP
Project:
Lisburne
Reference Site:
Lis DS 05
Site Error:
0.0ousft
Reference Well:
1-5-12
Well Error:
0.00usft
Reference Wellbore
1-5-12A
Reference Design:
-5-12A
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1-5-12
15-12A (actual) (03 67.35usft (Parker 272)
1-5-12A (actual) @ 67.35usft (Parker 272)
True
Minimum Curvature
1.00 sigma
EDM R5K- Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to 1-5-12A (actual) @ 67.35usft (Parker
Coordinates are relative to: 1-5-12
Offset Depths are relative to Offset Datum
Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
Central Meridian is 150" 0'0.000 W °
Grid Convergence at Surface is: 1.66°
.11
3 450
C
O
10
t0
d
� 300 -
LD
c
w
U
0
,150-
0
M
Ladder Plow'
3— 1-5-01, 1-5-01, 1-5-01 V1
$ 1-5-04,1-5-04,1-5-04V1
-rte 1-5-05,1-5-05,1-5-05 V1
—!— LS -08,L5 -08,L5 -08V7
$ L5 -09,L5 -09,L5 -09V1
$ 1 -5 -12,1 -5 -12,L5 -12V1
$ LS -13,L5 -13,L5 -13V1
-6- L5 -15,L5 -15,L5 -15V1
-XE 1-5-15, L5-15PB1,L5-15PB1 V1
822/2016 3:41: 20PM A0k7
4000 6000 8(6 10000 12000
Measured EpthD Vi000usn)
LEGN
-� L5-16,L5-16AL1,L5-16AL1V5 $ L5 -26,L5 -26,L5 -26V3
—>F L5-16,L5-16AL1P61,L5-16AL1P61V1 $ L5-26,L5-26PB1,L5-26PB1V11
$ LS-16,L5-16AL2,L5-1rAL2V7
$ L5-26,L5-26PB2,L5-26P132V13
-%- L5-16,L5-16AL2,Plan#2V18
-1F L5-26,LS-26PB3,L5-26P83V5
♦— L5-17,LS-17,L5-17V1
$ L5 -28,L5 -28,L5 -28V3
$ L5-17,L5-17A,L5-17AV13
$ 1-5-28, L5 -28A, L5 -28A, V6
$ 1-5-18, 1-5-18, 15-18 V1
�-
-)E 1-5-19,1-5-19,1-5-19V1
I
-} 1-5-21,1-5-21,1-5-21 V1
- - 1-5-28,1-5-28AL1, Plan #3 V18
jI
I
II
I I
I
I
I
I
I
I
I
_J________
I
-I ______J_
i
_ I
_I ____I I
I I I
I I
I
3— 1-5-01, 1-5-01, 1-5-01 V1
$ 1-5-04,1-5-04,1-5-04V1
-rte 1-5-05,1-5-05,1-5-05 V1
—!— LS -08,L5 -08,L5 -08V7
$ L5 -09,L5 -09,L5 -09V1
$ 1 -5 -12,1 -5 -12,L5 -12V1
$ LS -13,L5 -13,L5 -13V1
-6- L5 -15,L5 -15,L5 -15V1
-XE 1-5-15, L5-15PB1,L5-15PB1 V1
822/2016 3:41: 20PM A0k7
4000 6000 8(6 10000 12000
Measured EpthD Vi000usn)
LEGN
-� L5-16,L5-16AL1,L5-16AL1V5 $ L5 -26,L5 -26,L5 -26V3
—>F L5-16,L5-16AL1P61,L5-16AL1P61V1 $ L5-26,L5-26PB1,L5-26PB1V11
$ LS-16,L5-16AL2,L5-1rAL2V7
$ L5-26,L5-26PB2,L5-26P132V13
-%- L5-16,L5-16AL2,Plan#2V18
-1F L5-26,LS-26PB3,L5-26P83V5
♦— L5-17,LS-17,L5-17V1
$ L5 -28,L5 -28,L5 -28V3
$ L5-17,L5-17A,L5-17AV13
$ 1-5-28, L5 -28A, L5 -28A, V6
$ 1-5-18, 1-5-18, 15-18 V1
$ 1-5-28,1-5-28A,Plan #1 V14
-)E 1-5-19,1-5-19,1-5-19V1
-E- 1-5-28, 1-5-28AL1,L5-28AL1 V13
-} 1-5-21,1-5-21,1-5-21 V1
- - 1-5-28,1-5-28AL1, Plan #3 V18
[E FFD—)O RT COMPASS 50001 Build 616
,tea.
`krkn
.
—
—�i
..
»
\/
§
)§\§)
tk}\�
33
ai
)ci
7
—
)
& _
_ ——�
——,
/\\/»
�
■
§ƒ
EL
!£
!
}§
]/} }(
)r}
)t}
.
.
la
!§2/!!
!§2//i
0w
ED
\
'l2;Km
_..
_
/§§k
_ƒ\
ƒ. k—
)ƒ!\\
{/\
\/}k.0
-W02 !|///k/\\.
22)2[
\
/\\\
&
} /
(\E
_
.
!
-
z
{m
(\)\`\
)
22\
00
02
w
!
/\
§
_z
)!
!
c
!!;2
-
:
{
jƒ)\\
)`
/`
\
\)\
\\
}\{
)r/
16
]/{
{(�
\
%{�
CY
/)�/\
di
\
\\\CL
/\k\:
\.\
)k
2
0w
#
}
\
\16
/
i6 E
C9
}\{
)r/
.
]/{
{(�
\
%{�
CY
/)�/\
/\k\:
)k
2
0w
#
}\{
)r/
.
]/{
{(�
\
%{�
CY
/)�/\
/\k\:
)r/
.
]/{
{(�
\
%{�
)r/
.
!^2»&!
\
\
%{�
CY
\ k
) \
) k
0
LyE
`
\\\/\
\
EL�®
! _
F.E
aL77
w
0
N
p
a
a
n
Z z
¢
w
O
o_
❑
r o
o
F F
3
m �
O
N
N F U
F
n
d Z
m O
N
O
r❑ Z
�
p aj W O
c
J
O
d
2
f
K to Q X
❑
Q
=
❑
O
� m
�
F
X
O
Z
W
2
r n m
6
❑
N
N
�
N
O
O
n
o
w
0
d
`m wE
u
❑ m � 'm E ❑
K
❑
r '°
N 2
n
J❑
Z N
Q
O
❑0
O ti
t t
U Z
N
Q
m
O
❑ ¢
N
Z x
Q d
O 2
K W
0
w m
O
2
i
LL r 2
m
O F-
U N
w W
2
W
W N
Z
O
o
K
� to
W O
n o
Z S
Z Z�
2
W Q
[� th
N
J a' ❑
N
�
x R'
� U
v F¢ o
U
N N
z
�-
U a w' 0
v
d
U
U m U m F 2
N
N
a`
N
O Ll)
O N
LO Lo
N N
cy�l
�
W
g13J
uj
4.d
x
n
J
0�
V
0
U
L
C�
G
J�
o
v
U
R
C,
b
o
G
c
N..
Q1
m
o
d a
E
p
v
COM
O
>
4
N
-,M4
5
m
7
r
I
n
J
0�
V
0
U
L
J�
N
�
L
Cm
Z
c
r
n
C
d a
N
O
COM
N
• j j OI Of O) > > > �
ao o a Q a a a a' a
r M r fV ID 01 N� V
N N
❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑
J J J J J J J J J
W W W W W W W W W
LL LL LL LL LL LL LL LL LL
J J J J J J J J J
a a a a a a a a a
z z z z z z z z z
� LL LL LL LL LL LL LL LL LL
i
d
K U U LL
O N m a0,
> O J J W W W J !L
W U c c c O
c a E E E a
E 1 U V U
m
U
3 >
O z J J O O J J O
d 3 3 v v 3 3 d
aaa ofwwwa a
z z z z
O O O U O O j 0 0
a a a a a a
to M N m M O
M b O O M O Q a
O O O O
p C O p O p O
p O p O p p C p p
p p p p O p
❑ o ❑ ❑ ❑ ❑ o 0 0
N N O O N O O
0 0 0 0 0 0 0
V 6 0
b O O Of My N N
in m �c �c ypp n m m m
N N N N N N N N N
C� O) m A & O�
N N N N N N N N N
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
N N N N VI N N In N
m a0 m C O m� N N
N N M N a M N N
2❑ U 1 0 (j J J J
v
L
x @
Z
>- 3
_ N
vY�o„ r
u ° ° E >
a c c ° 0
C �
m O ¢ @ O
« E
a m
C J
C O t/1
C V L C
N
@
Y
N > � a W
@ O
C
W N N O
v H C
um
v 0 i.
0 L N >
I -. � C
« > N
N @ C W
E L O D
V v
N u U L c
Q N Q O CO O
v
v
J N
c Oa
ao
x in o 0
Y
v Q
@ pj
>
a o
m L
O �
« 1
m >
E
C
C O
� c
d �
' v W
v � n
•E N
� N Q
L y C
F- a` a @ m
P7 -D 2 16 -402,
Loepp, Victoria T (DOA)
From: Nocas, Noel <Noel.Nocas@bp.com>
Sent: Friday, August 19, 2016 2:53 PM
To: Loepp, Victoria T (DOA)
Subject: 1-5-12A Request PTD#: 216-002 CBL update for 7" intermediate liner
Attachments: L5-12A_USIT_Aug2016.ppt
Follow Up Flag: Follow up
Flag Status: Flagged
Victoria,
Please see the attached USIT log interpretation for the 1-5-12A intermediate liner. This isolation meets BP criteria for a
cement well barrier behind the T' liner.
Please let me know if you have any questions.
Best,
Noel
Noel Nocas
Drilling Engineer - BP Alaska
noel.nocas@bp.com
0:(907)564-5027
C:(907)229-9532
F: (907) 564-5510
From: Loepp, Victoria T (DOA) fmailto:victoria.loepp@alaska.gov]
Sent: Tuesday, August 16, 2016 7:10 AM
To: Thompson, Jacob
Subject: RE: 1-5-12A Request PTD#: 216-002 Request for approval to proceed #2.
Jacob,
Approval is granted to drill ahead without obtaining a FIT.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. Loepp@ a laska.gov<mai Ito: Victoria. Loepp@a laska.gov>
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil
and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may
contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may
violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or
forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-
1247 or Victoria. Loepp@alaska.gov<mailto:Victoria. Loepp@alaska.gov>
From: Thompson, Jacob [mailto:Jacob.Thompson@BP.comj<maiIto: [mailto:Jacob.Thompson@BP.com)>
Sent: Tuesday, August 16, 2016 6:22 AM
To: Loepp, Victoria T (DOA); Allen, Kenneth W
Subject: L5 -12A Request PTD#: 216-002 Request for approval to proceed #2.
Victoria,
As we just discussed on the phone we are requesting permission to drill ahead in the production hole without an FIT.
After drilling out the solid cement in the shoe track and 5' of new formation dynamic losses of 40-50 bph occurred. 20'
of new formation was drilled, and a static loss rate of 12 bph was measured while awaiting aogcc approval. There was no
sign of any u -tube pressure seen from the intermediate fluid while drilling the new formation. The plan will still be to
obtain a cerment bond log after drilling this section. Per our phone conversation and your verbal approval we will
resume drilling operations.
Thanks,
Sent from my Android phone using Symantec TouchDown (www.symantec.com<http://www.symantec.com>)
-----Original Message -----
From: Loepp, Victoria T (DOA) [victoria.loepp@alaska.gov)
Received: Monday, 15 Aug 2016, 10:43AM
To: Thompson, Jacob [Jacob.Thompson@BP.comj
Subject: RE: L5 -12A Request PTD#: 216-002 Request for approval to proceed.
Jacob,
Since plans are to fracture stimulate this well, please run a CBL on the 7" liner to determine cement presence and
quality.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria.Loepp@a laska.gov<ma ilto:Victoria. Loepp@alaska.gov>
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil
and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may
contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may
violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or
forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-
1247 or Victoria. Loepp@alaska.gov<mailto:Victoria.Loepp@alaska.gov>
From: Thompson, Jacob [mailto:Jacob.Thompson@BP.com]
Sent: Monday, August 15, 2016 10:20 AM
To: Loepp, Victoria T (DOA)
Cc: Lastufka, Joseph N
Subject: RE: 1.5-12A Request PTD#: 216-002 Request for approval to proceed.
Victoria,
Attached is a schematic representing the current condition of the well. We are planning on drilling a 6.125' hole out of
the 7" liner. Let me know if you need anything else.
Thanks,
Jacob Thompson
BP Alaska
Rotary Drilling Engineer
Cell: (907) 854-4377
Office: (907) 564-5579
From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov]
Sent: Monday, August 15, 2016 10:07 AM
To: Thompson, Jacob
Subject: RE: L5 -12A Request PTD#: 216-002 Request for approval to proceed.
Please send current schematic.
From: Thompson, Jacob [mailto:Jacob.Thompson@BP.com]<mailto:[mailto:Jacob.Thompson@BP.com]>
Sent: Monday, August 15, 201610:04 AM
To: Loepp, Victoria T (DOA)
Cc: Allen, Kenneth W
Subject: L5 -12A Request PTD#: 216-002 Request for approval to proceed
Victoria,
As I just explained on the phone we are requesting approval to proceed with drilling operations on the L5 -12A well with
rig Parker 272. Over the weekend we pumped our planned primary cement job for our 7" intermediate liner. As the
cement exited the 7" shoe all returns were lost, and no cement was thought to be lifted into the annlus, however the
plug bumped and the floats held. The liner hanger was set, running tool released and pulled out of hole. The liner top
packer was purposely not set in order to allow the ability to down squeeze cement into the annlulus from above the
liner top packer. A polish mill and ported sub was run into the hole and spaced out just above the LTP. —190 bbis of
cement was injected around the 7" liner hanger and liner top packer into the 7" x 8.5" open hole annulus. The liner top
packer was then set and the BHA pulled out of the hole. The 7" casing has been successfully tested and the production
hole drilling assembly is currently being run into the hole. The plan is to resume normal drilling operations for the 6.125'
production hole. Let me know if you have any question or concerns.
Thanks,
Jacob Thompson
BP Alaska
Rotary Drilling Engineer
Cell: (907) 854-4377
Office: (907) 564-5579
Em
�
)
\}
\
)/�
`
I!!
«
\
\8-
2�
;§
--
)
_?
k
CIO
/
0
!!
®
/0
/
—
4
=�(o
J/Sn���rg
)E{
/$ :
k\
k
�
I-E
) �m
)[//7
mo
CL \
/kƒ)\cc
/t
\\//)
§
\/
\
.§
§cz�
/ .2
LL
704q
\/
{/
\/
-
)/
k
®
�
k
�
-
-
�
2
a �=
rn
N
U
L-
Z (M
M
nCF)
D t
70
O
0)
4--
0 O
CO)
CO)
N
0
N
N
70
N
70
U
O
O
O0
CY)OQ
QNO
N
N
'
O
N (0
O
._
p
m
EC
L-
CO
O
U i
yyam�\
W
C fes- O 0 co CO ti m co T O ti O
V
N
Ln 00 O CO LO M N Ln Cil r N M o
N (M (O r f- :h M M d T O
(3) 00 00 M M f- Imo- P- CO M N O T
O O O 0 0 0 0 0 0 O 0 m m
r r T r r r r r r r r
N 00 0 CV T O O N 1-- I�- M
M O f- N M u? `cr 0 U') r (U^ O
m m O 00 I` ti ti ti (o MN O `-
0 0 0 0 0 0 o a o 0 0C-4 C%j
r r T r r r r r r r T
Loepp, Victoria T (DOA)
From: Loepp, Victoria T (DOA)
Sent: Thursday, July 28, 2016 8:59 AM
To: 'Sperry, Nathan'
Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com)
Subject: LS-12(PTD 187-010, Sundry 316-006, Plug for Redrill) L5-12A(PTD 216-002 Drill) BOP
Test Pressure Change
Follow Up Flag: Follow up
Flag Status: Completed
Nathan,
Approval is granted to test the BOPS to 3500 psig instead of the 4000 psig outlined on the approved Permit(L5-12A
Lateral PTD 216-002)) and Sundry(L5-12 Plug for Redrill, PTD 187-010, Sundry 316-006)). The MPSP is 2711 psig. This
approval should be placed with your approved copies of the PTD/Sundry and available for the AOGCC inspector to
review.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil R Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria Loeoona aiaska oov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal low. if you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria Loeooralaska go
From: Sperry, Nathan fmailto•Nathan Sperrv@bp com]
Sent: Thursday, July 28, 2016 8:26 AM
To: Loepp, Victoria T (DOA)
Cc: Lastufka, Joseph N
Subject: L5 -12A BOP Test Pressure
Hi Victoria,
On L5 -12A, our MASP is 2,711 psi.
We submitted the Sundry and Permit with the intent to perform our BOPE tests to 4,000 psi and our tubular tests to
4,000 psi (casing, LTP, TWC). The driver for testing to 4,000 psi was that our post -rig work team believed they needed
up to 4,000 psi to pump their acid and stimulation. They have revised their estimate and believe that they will only need
3,000 psi.
Do we have your approval to drop ow test pressure for our BOPE to 3,500 psi? We also are requesting to change our
integrity tests from 4,000 psi to 3,500 psi.
Regards,
Nathan Sperry
Drilling Engineer
Cell: 907-268-8416
Office: 907-564-4258
/'71) Z14-0-92-
Loepp,
14—DoL
Loepp, Victoria T (DOA)
From: Loepp, Victoria T (DOA)
Sent: Friday, June 03, 2016 3:19 PM
To: 'Sperry, Nathan'
Subject: RE: L5 -12A (PTD 216-002) Intermediate Cement Slurry Change
Nathan,
With the MPSP on the PTD of 2711 psig, this change is approved as outlined below. Please include this approval with
the approved PTD.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria Loeooro)alaska oov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCCJ, State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria Loeoo@alaska oov
From: Sperry, Nathan (mailto•Nathan SoerrvLd)bp com]
Sent: Friday, June 03, 2016 2:06 PM
To: Loepp, Victoria T (DOA)
Cc: Lastufka, Joseph N
Subject: RE: L5 -12A (PTD 216-002) Intermediate Cement Slurry Change
Hi Victoria,
We'd like to make another change to what was approved in the PTD. When we drill our intermediate hole (8-1/2" hole
with 4" DP), we'd like to have 7" full bore rams in the uppermost cavity (rather than variables). We'll still have a set of
variables, a set of blind shears, and our annular. This is very similar to what was proposed and approved for Parker 272
on L1-13 this morning (except they are installing 9-5/8" rams rather than 7").
Please let me know if you approve these changes and/or if you need any additional information
Regards,
Nathan Sperry
Drilling Engineer
Cell: 907-268-8416
Office: 907-564-4258
From: Sperry, Nathan
Sent: Thursday, May 19, 2016 2:04 PM
To: Loepp, Victoria T (DOA) (victoria Ioepi)( alaska aov)
Cc: Lastufka, Joseph N
Subject: 1-5-12A (PTD 216-002) Intermediate Cement Slurry Change
Hello Victoria,
The intermediate cement job plan for LS -12A as permitted is to pump 221 sx (68.3bbls) of 11.5ppg LiteCrete followed by
110 sx (22.7 bbls) of 15.8ppg Class G.
We would like to change the plan to pump only one slurry. With your approval, we will pump a 15.8ppg class G and will
increase the volume to cover the entire intermediate interval (-91 bbls of class G, with minor variations pending as -
drilled depths). Our intent is to fully cement the intermediate interval.
We believe pumping one slurry will simplify the operation and will provide the best cement coverage.
Please let us know if you approve our proposed change. If you need any more information, please let me know
Regards,
Nathan Sperry
Drilling Engineer
Cell: 907-268-8416
Office: 907-564-4258
THE STATE c u A
OfALASKA
GOVERNOR BILL WALKER
Ken Allen
Engineering Team Lead
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www. 009cc.alaska.gov
Re: Prudhoe Bay Field, Lisburne Oil Pool, PBU L5 -12A
BP Exploration (Alaska), Inc.
Permit to Drill Number: 216-002
Surface Location: 1668' FSL, 15' FWL, Sec. 01, TI 1N, R15E, UM
Bottomhole Location: 1801' FSL, 1166' FWL, Sec. 07, TI IN, R16E, UM
Dear Mr. Allen:
Enclosed is the approved application for permit to re -drill the above referenced development
well.
This permit to drill does not exempt you from obtaining additional permits or an approval
required by law from other governmental agencies and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
AOGCC reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to
comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit.
Sincerely,
Cathy P. oerster
Chair
DATED this L day of February, 2016.
STATE OF ALASKA
_ASKA OIL AND GAS CONSERVATION COMMIS'
PERMIT TO DRILL
20 AAC 25 005
RECEIVED
JAN 0 5 2016,
ORIGINAL .�f 1/1/6
Form 10401 Revised 11/1015 This permit is valid for 24 months from the date of approval (20 AAC 25,005(g)) Submit Form and
Attach is in Duplicate
-7/-•2-0-•iC.
Ia. Type of Work: 1b. Proposed Well Class: Exploratory -Gas
❑ Service -WAG ❑ Service - Disp❑
1c.
Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil
Reent
0 • Service - Win! ❑ Single Zone 0
osed for:
• Colabed Gas ❑Gas Hydrates ❑
Retlrill 0 • ry ❑ Exploratory -Oil ❑ Development -Gas
❑ Service -Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 Single Well ❑
11 Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 6194193 •
PBU L5 -12A
3 Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 13996' ' ND: 8790'
PRUDHOE BAY, LISBURNE
OIL
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028320 8 028338 .
Surface: 1668' FSL, 15' FWL, Sec. 01, TIIN, RISE, UM •
8. Land Use Permit:
73. Approximate spud date:
Top of Productive Horizon: 4048 FSL, 4493' FWL, Sea 12, T11N, RISE, UM
84-62
June 1, 2016 -
Total Depth: 1801' FSL, 1166' FWL, Sec. 07, T1 IN, R16E, UM
9. Acres in Property: 2560 8 2469
14. Distance to Nearest Property:
qb, Location of Well (State Base Plane Coordinates -NAD 27):
10. KB Elevation above MSL: 69.1 •feet
5800
15. Distance to Nearest Well Open
Surface: x- 717446 y- 5974800 • Zone - ASP4
GL Elevation above MSL: 21.75 -feet
to Same Pool:
16. Deviated wells: Kickoff Depth: 8950 feet
17.0
Maximum Anticipated Pressures in psig (see
20 AAC 25.035)
Maximum Hole Angle: 114 degrees
Downhole: 3599 • Surface:
2711 '
18, Casing Program: Specifications
Top -ing Depth - Bottom Cement Quantity, c.f. or sacks
SettND
Hole Cwin Wei ht Grade lin Len [h
MD N
8-1/2" 7„ 26# L-80 VamTop H 2114'
includin sta a tlata
8800' 7110' 10914' 8721' 227 sx LiteCrete. 110 sx Class'G'
-1/2" 13.5# 13Cr85 Hydrif 521 3232
10764' 8605' 13996' 8790' Uncemented Slidin Sleeves
w/ Swell Packers
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (1t): Total Depth ND (ft): Plugs (measured): Effect. Depth MD (h): Effect. Depth ND (it):
1
11242 9267 Junk (measured):
None
11197 9225 Unknown
Casing Length Size
Cement Volume MD ND
Conductor/Structural 79 20" 1860# Poleset
42-121 42-121
Surface 4167 133/8" 2450 sx ASIII, 600 sx Class'G', Toto job: 115 sx AS 1 41-4208
41-4001
Intermediate 10609 9-5/8^ 585 sx Class 'G', 300 sx ASI
38-10646 38-8709
Production
Liner 817 7" 332 sx Class'G' 10425-11242 8505-9267
Perforation Depth MD (ft): 10668 - 10922 Perforation Depth ND (it): 8729-8967
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Huard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact
from without prior written approval. Niedermeyer, James
Email James.NiedermeyerQbp.com
Printed Name Ken Allen
Title Engineering Team Lead
Signature (--------. Phone +1 907 564 4366 Date
Commission Use Onty
Permit to Drill Permit Approval
Number:�j — API Number: 50- 029-21694-01-00 See cover letter for
Date: I I „ I' n other
VJ l.Y requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or
produce coalbed methane, gas hydrates, or gas contained in shales:
Other:
B p t�5 t �O Ci/
U b G �b Samples req'd: Yes ❑ No
51l � J Mud log req'd: Yes ❑1 No
/472rpul ar.,r/--� {r=V-C"�/f-�Y� H2S measures Yes Fd No ❑ Directional Ivy req'd: Yes NJ No ❑/-
� Q(7 Spacing exception �
'? J req'd: Yes ❑ No
b! r SL�f Inclination -only Ivy req'd: Yes ❑ No (17
CCht`VP'7"UI7 io be
%b rrl/cw«1 w C
qq �� Post initial injection MIT req'd: Yes ❑ No L7
pro Gi v e f/ o ✓i h p L FI T�✓a /'✓c cl busccl drn �-" Crrw.c�,¢�ab ras�ltS
I APPROVED BY
Approved by COMMISSIONER THE COMMISSION Date 2 !G l
,! 16
ORIGINAL .�f 1/1/6
Form 10401 Revised 11/1015 This permit is valid for 24 months from the date of approval (20 AAC 25,005(g)) Submit Form and
Attach is in Duplicate
-7/-•2-0-•iC.
To: Alaska Oil & Gas Conservation Commission
From: James Niedermeyer, ODE
Date: December 30, 2015
RE: L5 -12A Permit to Drill
The L5 -12A well is scheduled to be drilled by Parker 272 in April, 2016. This sidetrack well is a
horizontal producer targeting the Lisburne WH6, WH5, and WH4. The planned well will kick out of 9-
5/8" casing and use 7" intermediate casing, and 4-1/2" production liner. The intermediate casing will
be set at the top of the Lisburne, and the production interval will be completed with a cementless liner
using sliding sleeves and swell packers.
The maximum anticipated surface pressure from the Lisburne with a full column of gas from TD to
surface is 2,711 psi (assumes 7.79 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). .
The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an
annular). The BOP rams and annular will be tested to 4,000 psi.
A detailed operations summary is included with the permit application.
If there are any questions concerning information on L5 -12A, please do not hesitate to use the contact
information below.
James Niedermeyer Office: (907) 564-4874 Cell: (907) 205-2357 1 Email: james.niedermeyer@bp.com
Attachments:
Well Bore Schematic
Proposed Pre -Rig Schematic
Proposed Completion
Directional Package
BOPE Schematic
As -Built Survey
Well Head Schematic
Tree Schematic
L5 -12A PTD 1
12/30/2015
Planned Well Summary
Well L5 -12A Well Producer Target
Type I Objective Lisburne
Current Status 1-5-12 is currently shut in with collapsed tubing.
Estimated Start Date:6/1/2016 .Time to Com late: 31.1 Da s
Planned KOP: 8,950' MD Planned TD: 13,996' MD / 8,721' TVDss
Ri Parker 272 GL -RT: 47.35 RTE ref MSL : 69.1
Directional - Baker wo06
KOP: 8,950' MD
Northin
Eastin
TVDss
Offsets
TRS
Tgt 1
TLSB
5,972,034
722,009
8,650
1,231.5' FFNWLL 4,493.5'
11N 15E Sec 12
Tgt 2
Invert
5,971,747
722,383
8,888
1,529.3' FFWL 4,858.8'
11N 15E Sec 12
Tgt3
Revert
5,970,710
723,326
8,730
2,593.9' L / 490.8'
11 N 16E Sec 7
FW
4
Invert
5,970,004
723,866
8,785
3,315.8' FFN�L 1,009.6'
11N 16E Sec 7
Tgt 4
BHL
5,969,846
724,027
8,720
3,478.5' FN / 1,165.8'
11N 16E Sec 7
FWL
Planned KOP: 8,950' MD Planned TD: 13,996' MD / 8,721' TVDss
Ri Parker 272 GL -RT: 47.35 RTE ref MSL : 69.1
Directional - Baker wo06
KOP: 8,950' MD
Maximum Hole Angle:
-460 in the intermediate section
-1140 in the production section
Close Approach Wells:
None. All offset wells pass BP Anti -collision Scan Criteria.
Survey Program:
8,950' MD to TD = MWD+IFR+MS-WOCA
Nearest Property Line:
-15,800'
Nearest Well within Pool:
-650' not in same zone
1-5-12A PTD 2 12/30/2015
Formation Tops and Pore Pressure Estimate (SOR)
1-5-12A PTD 3 12/30/2015
Estimated
Most Likely
Formation
Formation
Fluid
Pore Type
Top
Pressure
NDss)
(EMW (for sands)
CM3
7090'
10.0 n/a
KOP
7159'
10.0 n/a
CM2
7817'
10.0 n/a
CM1
8003'
10.2 n/a
THRZ
8414'
10.3 n/a
TLSB/
8650'
TLWH 62
729 Gas
7" Casing
8652'
7.29 Gas
TLWH-61
8668
7.26 Gas
TLWH-60
8700
7.13 Gas
TLWH-54
8715
7.13 Oil
TLWH 53
8732
7.13 Oil
TLWH 52
8746
7.13 Oil
TLWH-51
8777
7.13 Oil
TLWH-50
8795
7.13 Oil
TLWH 48
8805
7.14 Oil
TLWH-47
8835
7.14 Oil
TLWH-46
8865
7.14 Oil
TLWH-45
8885
7.14 Oil
Invert
7.14 Oil
TLWH-45
8885
Invert
714 Oil
TLWH-46
8865
Invert
714 Oil
TLWH-47
8830
Invert
714 Oil
Fault#1
8823
7.79 Oil
TLWH 47
8800
(Invert, Faulted
7.79 Oil
in to
TLWH 48
8774
Invert
7.79 Oil
TLWH-50
8761
Invert
7.79 Oil
TLWH 51
8745
Invert
779 Oil
TLWH 51
8745
revert
7.79 Oil
Fault #2
8755
7.79 Oil
TLWH 51
8773
(revert, fa_ulted
7.79 Oil
in to
Revert
8785
7.79 Oil
TLWH-51
8773
overt 2
7.79 Oil
TLSB
8750
7.79 Oil
1-5-12A PTD 3 12/30/2015
Casing/Tubing Program
Hole Size
Liner/
Tbg O.D.
Wt/Ft
Grade
Conn
Length
Top
Bottom
HTHP FL
1 <8
pH
pH
8,950' MD - 10,914' MD
1 10.5-103
10-15
MD / TVDss
MD / TVDss
8-1/2"
7"
26#
L-80
VamTop HC
2,114'
8,800'/ 7,042'
10,914'/ 8,652'
(150'lap)
6-1/8"
4'A"
13.5#
13Cr-85
Hydril 521
3,232'
10,764'/ 8,536'
13,996'/8,721'
(150' lap)
Tubing
4 34°
12.6#
13Cr-85
VamTop
10,779'
Surface
10,769'/ 8,540'
-5' into liner TBR)
Mud Program
Intermediate Mud Pro erties: LSND
1 8-3/4" Hole
Section
Depth Interval
Density
PV (cp)
Ib/1QOftz
API FL
HTHP FL
1 <8
pH
pH
8,950' MD - 10,914' MD
1 10.5-103
10-15
1 20-30
1 <8
I NA
<20
9.0 -10.0
Production Mud Properties: Water Based Polymer Fluid QuikDril-N) 6-1/8" Hole Section
Depth Interval
Density
PV (cp)
Ib/P(-100m, API FL
HTHP FL MBT
pH
10,914'MD-TD
8.5-9.0
1 <8
1 12-20 1 <12
1 NA <4
8.5-9.5
Logging Program
6-1/2" Intermediate
Sam le Catchers - as r wired b Geol
Drilling:
Dir/GR/GRAB/RES/PWD/near-bit-GR
Open Hole:
None
Cased Hole:
Contingency USIT to evaluate cement behind 7" liner in the event problems are encountered
during the cement job.
6-1/8" Production
Sam le Catchers - as required by Geology
Drilling:
Dir/GR/RES/NEU/DEN/PEF
Oen Hole-
None
Cased Hole:
None
1-5-12A PTD 4 12/30/2015
Cement Program
Casin SizeRWW;;9
0 VamTo HC Intermediate Casing
Open hole volume + 40% excess
Basis
Tar et 150 ft MD liner la
Oen hole volume + 40% excess + 80 ft shoe track
To son, above shoe
Total Ceme68.3
-40 bbls of Visco_ified Spacer weighted to -12.0 p (Mud Push II)
bbl_, 384 tuft, 221 sks of 11.5 LiteCRETE, Yield: 1.74 cuff/skVolume22.7
bbls, 128 cult, 110 sks 15.8 Ib/ al Class G - 1.16 cuft/skBHST
175° F
Surface and Anti -Collision Issues
Surface Close Proximity:
No wells will be affected by the Parker 272 rig shadow.
Sub -Surface Pressure Management:
Tertiary/Cretaceous: DPZ1 in this area is not expected to be dramatically influenced by
Tertiary/Cretaceous injection, and values are expected to remain within the pad validated values.
Confirm that any new pressures taken in offset wells are in range of expected BHP at spud. Verify
that no reservoir management activities (increased injection, SI wells, etc) have occurred that would
significantly affect pore pressure prediction. Update pressure prediction with new estimates if
pressure is thought to have changed. If significant change in reservoir management and possible
pore pressure change, acquire SBHP in 1-5-12.
Check pressure and fluid data from NWD to confirm pressure prediction and fluid input into PPFG.
Anti -Collision:
None. All offset wells pass BP Anti -collision Scan Criteria.
Offset well ownership information
All offset wells identified within 200 ft of the proposed wellbore are operated by BP.
L5 -12A PTD 5 12/30/2015
Hydrogen Sulfide j
L5 -Pad is considered an H2S site. Recent H.,S data frnm thA r,n,t i.�• r n ,.,�
Faults
Formation Where Fault
Well Name V
H2S Level
Date of Reading
#1 Closest SHL Well H2S Level
1-5-08 (Lisburne)
40 ppm
10/22/2015
#2 Closest SHL Well H2S Level
1-5-16 (Lisburne)
42 ppm
6/1/2010
#1 Closest BHL Well H2S Level
1-4-12 (Lisburne)
550 ppm
4/9/2005
#2 Closest BHL Well H2S Level
1-5-18 (Lisburne)
50 ppm
10/24/2015
#3 Closest BHL Well 142S Level
14-02 (Lisburne)
120 ppm
10/18/1992
#4 Closest BHL Well 1-12S Level
1-5-04 (Lisburne)
80 ppm
5/30/2015
Max Recorded H2S on Pad/Facility
1-4-12 (Lisburne)
1100 ppm
10/8/1997
Faults
Formation Where Fault
MD
TVDss
Throw Direction and
Lost Circ
Encountered
Intersect
Intersect
Magnitude
Uncertainty
Potential
Fault 1 - Wahoo Zone 4
12,038
8,823
dips N (10-30 ft), plan
150 ft lateral
crosses low side to high side
& MD
med
Fault 2 - Wahoo Zone 5
13,260
8,755
dips S 00-30ft), plan
150 ft lateral
crosses hi h side to low side
& MD
med
Drilling Waste Disposal
• There is no annular injection in this well. /
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
1-5-12A PTD 6 12/30/2015
Well Control
8-1/2" & 6-1/8" hole sections will be drilled with well control equipment consisting of 5,000 psi working
pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum
potential surface pressures. Based upon calculations below, BOP equipment will be tested to
4,000 psi.
BOP test frequency for 11-5-12A will be 7 days during the decomplete phase and 14 days with
function test every 7 days while drilling. Except in the event of a significant operational issue
that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test
period should not be requested.
8-1/2" Intermediate Interval
Maximum anticipated BHP
3,279 psi at the TLSB North fault block at 8,650' TVDss (7.29 ppg EMW).
Maximum surface pressure
2,414 psi at the TLSB North fault block (0.10 psi/ft gas gradient to
surface
25.0 bbls with 11.37 ppg EMW frac gradient.
Kick tolerance
Assumes 7.29 ppg pore pressure at the TLSB + 0.5 ppg EMW kick
Maximum surface pressure
intensitvandl0finrMW.
Planned BOP test pressure
Rams test to 250 psi / 4,000 psi
Annular test to 250 psi / 3,500 psi
Integrity Test—12-1/4" hole
LOT after drilling 20'-50' of new hole
9-5/8" Casing Test
4,000 psi surface pressure
6-1/8" Production Interval
Variance Requests
1. The Lisburne formation is highly faulted/naturally fractured with high lost circulation potential.
ECD's while drilling out of 7" shoe will be greater than the required FIT for kick tolerance.
Assuming zonal isolation objectives are met on the 7" liner job, and if lost circulation occurs
prior to drilling 20 ft. of new formation, it is requested to drill to TD without obtaining a FIT.
A similar event occurred in 2015 on L1-23 (PTD 215-060) and a variation request was
granted.
L5 -12A PTD 7 12/30/2015
3,279 psi at the TLSB North fault block at 8,650' TVDss (7.29 ppg
Maximum anticipated BHP
EMW)
3,599 psi at the TLSB South fault block at 8,650' TVDss (7.79 ppg
EM
2,414 psi at the TLSB North fault block (0.10 psi/ft gas gradient to
Maximum surface pressure
surface)
2,711 psi at the TLSB South fault block (0.10 psi/ft gas gradient to
surface
Infinite with >8.78 ppg frac gradient.
Kick tolerance
Assumes a 7.79 ppg max pore pressure in the LSB + 0.5 ppg kick
intpnqitv and 8.5 nnr MW.
Planned BOP test pressure
Rams test to 4,000 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
Inte rit Test — 6-1/8" hole
FIT after drilling20'-50' of new hole
4Liner To Packer
4,000 Fsi surface pressure
Planned completion fluids
8.5 ppg seawater / 2,050' diesel to 1,981' TVDss
Variance Requests
1. The Lisburne formation is highly faulted/naturally fractured with high lost circulation potential.
ECD's while drilling out of 7" shoe will be greater than the required FIT for kick tolerance.
Assuming zonal isolation objectives are met on the 7" liner job, and if lost circulation occurs
prior to drilling 20 ft. of new formation, it is requested to drill to TD without obtaining a FIT.
A similar event occurred in 2015 on L1-23 (PTD 215-060) and a variation request was
granted.
L5 -12A PTD 7 12/30/2015
Drill and Complete Operations Summary
Current Condition and Well History
1. Tubing collapsed above production packer at 10,367' MD. Unable to drift past 10,357' MD.
2. Parent wellbore L5-12 to be abandoned per Sundry.
Quick Overview
1. Move in Parker 272.
2. Nipple up BOPE and test to 4,000 psi.
3. Pull 2-7/8" tubing from cut at -9,000' MD.
4. Make cleanout run to tubing stub
5. Rig up a -line and set EZSV at -8,972' MD. Set whipstock at 8,950' MD and mill window + 20-50'
of new formation from middle of the window. Perform LOT.
6. Drill 8-1/2" hole to top of the Lisburne to TD at -10,914' MD.
7. Run 7" liner and cement to 200 ft above the TOL (TOC at -8,600' MD). Circulate excess cement
from TOL.
8. Pressure test casing to 4,000 psi.
9. Drill out of 7" liner and perform FIT.
10. Drill 6-1/8" horizontal production hole in the Lisburne to TD of -13,996' MD.
11. Run 4-1/2" solid cementless -swell packer/ sliding sleeve liner.
12. Pressure test liner and liner top packer to 4,000 psi.
13. Run 4-1/2" chrome completion tubing. Sting into tieback receptacle and set production packer.
14. Pressure test the tubing and inner annulus to 4,000 psi each.
15. Freeze protect to 200' TVD below BPRF.
16. RDMO.
Pre -rig Work
1. Set CIBP in tubing at -10,300' MD.
2. Pull GLV from GLM #6.
3. Pump 71 bbls cement and squeeze into IA, leaving 1000' cement plug in tubing and IA.
4. Cement control lines and pressure test.
5. Tag and confirm TOC
6. Jet cut tubing at 9,000' MD.
Proposed Drilling Operations
1. MIRU Parker 272.
2. Test TWC from above and below to 4,000 psi psi for 5 minutes each.
3. Nipple down tree. Nipple up BOPE and test to 4,000 psi. (Configured from top to bottom: 13-
5/8" annular preventer, 2-7/8" x 5-1/2" VBRs in the upper cavity, blind/shear rams, mud cross
and 2-7/8" x 5-1/2" VBRs in the lower cavity).
a. Test rams and annular to 250 psi / 4,000 psi with 4" test joirit.
b. Notify AOGCC 24 hrs in advance of full test.
4. Pull TWC with lubricator.
5. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean
seawater.
6. Pull 2-7/8" tubing from the pre -rig cut.
7. Perform 9-5/8" cleanout run to tubing stub.
8. Rig up a -line. Run and set EZSV at -8,972' MD. Pressure test to 250 psi for 5 minutes and
4,000 psi for 30 charted minutes each. Change 9-5/8" packoff and tubing spool
L5 -12A PTD 8 12/30/2015
9. PU 9-5/8" whipstock, bottom trip anchor, and 8-1/2" window milling assembly (to include full
gauge string mills). RIH to top of EZSV, orient, and set whipstock.
10. Swap wellbore over to 10.5 ppg LSND milling fluid.
Drill 8-1/2" Intermediate Hole
11. Mill window in 9-5/8" casing plus 20-50' of new formation.
12. Pull into the window and perform LOT. Minimum LOT required is 11.37 ppg EMW for 25 bbl kick
tolerance.
13. POOH for drilling BHA #1.
14. MU 8-1/2" drilling RSS BHA #1 w/ MWD/GR/RES/PWD/near-bit GR and RIH.
15. Kick off and drill 8-1/2" intermediate interval per the directional plan to TLSB TO of -10,914' MD.
16. At TD, CBU a minimum of 2x, or until wellbore is clean.
17. Perform short trip to the window.
18. RIH to TD, circulate the wellbore clean and POOH on elevators.
Run & Cement 7" Intermediate Liner
19. Change upper 2-7/8" x 5-1/2" VBRs to 7" casing rams and test to 250 psi low 14,000 psi high.
20. Run 7", 26# L-80, VamTop HC liner to TD, with 150' liner lap into 9-5/8" window.
21. Cement liner to TOL with 11.5 ppg LiteCrete lead and 15.8 ppg Class G tail cement. Circulate
excess cement above TOL.
22. Set liner top packer and liner hanger. POOH and LD liner running tool.
23. Change upper 7" casing rams to 2-7/8" x 5-1/2" VBRs and test to 250 psi low / 4,000 psi high.
24. Test 7" liner to 250 psi for 5 minutes / 4,000 psi for 30 minutes after cement has reached a
minimum 500 psi compressive strength.
Drill 6-1/8" Production Hole Section
25. MU 6-1/8" drilling BHA with MWD/GR/RES/NPHI/PEF and RIH.
26. RIH and tag landing collar.
27. Displace wellbore to 8.5 ppg QuikDril-N.
28. Perform a negative pressure test on 7" liner (no flow test).
29. Drill shoe track and 20-50 ft of new formation. Pull above shoe and perform FIT. Minimum FIT
required is 8.78 ppg EMW for infinite kick tolerance.
30. Drill 6-1/8" production interval per the directional plan to TD of -13,996' MD.
31. At TD, CBU a minimum of 2x, or until wellbore is clean.
32. Perform short trip to the shoe.
33. RIH to TD, circulate the wellbore clean and POOH on elevators.
34. LD excess 4" DP and BHA.
Run 4-1/2" Production Liner
35. Run 4-1/2", 13.5 ppf, 13Cr-85, Hydril 521 swell packer / sliding sleeve production liner to TD, with
150 ft liner lap into 7" casing.
36. Drop ball and shift liner circulation valve closed.
37. Set liner hanger and liner top packer.
38. Displace wellbore to clean seawater above TOL.
1-5-12A PTD g
12/30/2015
39. POOH and LD liner running tool.
40. Pressure test 9-5/8" casing x 7" liner x 4-1/2" liner envelop to 250 psi low / 4,000 psi high.
Run 4-1/2" Completion
41. RU and run 4-1/2", 12.6# 13Cr-85 VamTop completion per the tally. Tag up in PBR, space out,
and land tubing hanger. RILDS.
42. Displace tubing and IA to clean seawater.
43. Reverse circulate in heated seawater and inhibited seawater to IA and tubing (surface to surface).
44. Drop ball & rod and set production packer. Individually test tubing and IA to 250 psi low / 4,000 psi
high.
45. Shear DCR valve.
46. Reverse circulate in diesel freeze protect down IA using rig's injection pump to freeze protect IA
and tubing to 2050' MD / 1,981' TVDss.
47. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm
well is dead.
N D/N U
48. Install TWC and test from above and below to 250 psi low 14,000 psi high for 5 minutes each.
49. N/D BOPE. NU adapter flange and double master valves. Test to 250 psi / 5,000 psi for 5 minutes
each with diesel.
50. Ensure Heet is left on top of TWC and only diesel is left in the tree.
51. Install all annulus valves and secure the well.
Release Rig
52. Rig down Parker 272.
53. Move rig off location.
Post -Rig Operations
1. Change out dry hole tree for production tree.
2. Pull TWC, ball and rod, and RHC plug. Pull shear valve and install dummy GLV.
3. Negative pressure test on 7" liner top.
4. Perform acid stimulation.
5. Pull dummy GLVs. Install GLVs.
6. Flowback, per ASRC.
7. Modify S -riser as required.
8. Install flow lines and well house.
L5 -12A PTD 10 12/30/2015
L5 -12A Drilling Critical Issues
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control / Reservoir Pressures
A. Intermediate Hale 1: The CM1, CM2 and CM3 are expected to be a 10-10.2 ppg EMW.
Formation pressures will be controlled with a 10.5 — 10.8 ppg mud to drill to the planned TLSB
TD.
C. Production Hole: The Lisburne is expected to be at a 7.8 ppg EMW. Reservoir pressures will be
controlled by using 8.5 — 9.0 ppg water based mud.
II. Lost Circulation/Breathing
A. Intermediate Hole 1: There are no expected fault crossings in the intermediate hole. However,
breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result
of high ECD's.
B. Production Hole: Fault and fracture related losses are common on 1 -5 -pad. There are 2 expected
fault crossings in the production hole. Past wells have experienced lost circulation and well bore
breathing in the Lisburne.
I.Fault Locations
Formation Where Fault
MD
TVDss
Throw Direction and
Lost Circ
Encountered
Intersect
Intersect
Ma nitude
Uncertainty
Potential
Fault 1 — Wahoo Zone 4
12,038
8,823
dips N (10-30 ft), plan
150 ft lateral
med
crosses low side to hi h side
& MD
Fault 2 — Wahoo Zone 5
13,260
8,755
dips S (10-30ft), plan
150 ft lateral
med
crosses high side to low side
& MD
IV. Integrity Testing
Test Point 20'-50' froTest Depth Test a EMW Ib/ al
9-5/B" window m the 9-5/8" window LOT 11.37 ppg
7" shoe 20'-50' from the 7" shoe FIT 8.78 ppg
1-5-12A PTD 11 12/30/2015
V. Hydrogen Sulfide
L5 -Pad is considered an H2S site. Recent H,S data from the oad is as follows
VI. Anti -Collision Issues
➢ None. All offset wells pass BP Anti -collision Scan Criteria.
CONSULT THE L5 -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
L5 -12A PTD 12 12/30/2015
Well Name
H2S Level
Date of Reading
#1 Closest SHL Well H2S Level
L5-08 (Lisburne)
40 ppm
10/22/2015
#2 Closest SHL Well H2S Level
L5-16 (Lisburne)
42 ppm
6/1/2010
#1 Closest BHL Well H2S Level
L4-12 (Lisburne)
550 ppm
4/9/2005
#2 Closest BHL Well H2S Level
1-5-18 (Lisburne)
50 ppm
10/24/2015
#3 Closest BHL Well H2S Level
L4-02 (Lisburne)
120 ppm
10/18/1992
#4 Closest BHL Well H2S Level
1-5-04 (Lisburne)
80 ppm
5/30/2015
Max Recorded H2S on Pad/Facility
L4-12 (Lisburne)
1100 ppm
10/8/1997
VI. Anti -Collision Issues
➢ None. All offset wells pass BP Anti -collision Scan Criteria.
CONSULT THE L5 -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
L5 -12A PTD 12 12/30/2015
TREE= 5-9116" CIW
VVE3_LHFAD=
FMC
ACTUATOR=
RAPORC
MB. E LEV =
60
lam. BE -V=
KA
KOP=
28W
kbx Angle =
5W@7409
Datum MD=
10915
Datum ND=
8900 SS
CONDUCTOR _#. . D = _' H ?
Minimum ID = 2.259" @ 10654'
AVA BPL NIPPLE
TOP OF 7" LNR
2441- H10`723'
PERFORATION SUMMARY
REF LOG ZDIJCNJGR DA ON 02124/87
ANGLEATTOPF$iF: 21' @ 10668'
Note: Refer to production DB for historical pert data
SIZE
SPF
I INTERVAL
Opn/Sgz
SHDT
SQZ
4-
2
10668 - 10682
O
06105/87
2823
4"
2
10688- 10698
O
06105/87
2-118"
1
10735 - 10739
O
10115187
BK -2
2-1/8'
1
10750-10755
O
10/15187
MW
2-118'
1
10757 - 10763
O
10115/87
7960
2-118'
1
10771- 10773
O
10115/87
2-118'
1
10775- 10777
O
10115187
RK
2-1/8'
1
10783 - 10788
O
10/15187
2-1/8"
1
10794-10798
O
10/15/87
4"
2
10856 - 10878
O
0611)5/87
4^
2
10898 - 10922
O
0610.5/87
PBM
T LN2, 29#, L-80, .0371 bpf, D = 6.184'
2 �, .N 69�HOT 9800'-
L5-1,
TAILME ON BTM —
T U HF
2205'2-718" CAMCO TRDFX 1A TRSSSV. D=2.317
•,
L •,
1036T 95/8" x 2-718" BrtoWN FB MR o= 3.00'
Mr AVA BPL NP, D=2.259"
2-718• CAMOO BLAST JOkJTS, D = 2.438'
X 2-718" BROWM 4B WR
= 2.568"
FISH- 2-718'TALPPEw/AVA NP -69'
DATE REV BY COMEMM
MCMURW GAS LFr MANDRELS
03102187 ORIGINAL COMPLETION
iT MD
TVD I
DEV
I TYPE
I VLV I
LATCHPORT
Dol
2 2826
2823
11
FMiO
DV
BK -2
0
3 5722
5064
44
HkM
M/
BK -2
0
03/10
4 8317
6756
46
MW
DV
BK -2
0
5 9823
7960
27
MW
DV
BK -2
0
6 10259
8352
24
FMiO
SO
RK
20
03110
1036T 95/8" x 2-718" BrtoWN FB MR o= 3.00'
Mr AVA BPL NP, D=2.259"
2-718• CAMOO BLAST JOkJTS, D = 2.438'
X 2-718" BROWM 4B WR
= 2.568"
FISH- 2-718'TALPPEw/AVA NP -69'
DATE REV BY COMEMM
DATE REV BY COMIu NT5
03102187 ORIGINAL COMPLETION
08/18/14 PJC RffORMAT WBS CLEANUP
12Y29101 CHrW CORRECTIONS
06/11/04 KA 13-308' CSG CORRECTION
03/03/07 RL DATUM M)
07109114 JIZPM PULL®BPC SLV (07108/14)
08/04/14 DLV PJC TREE GO
LISBURrE UNIT
WELL: LS12
PERM' NO' '1870100
AH No: 50-0292169400
SEI; 1, TI IN, R15F 1669 FSL 8 IV FWL
BP Exploration (Alaska(
TREE= 5-91
WELLHEAD=
FMC
ACTUATOR=
BAKBRC
OKE. ELEV =
60'
BF. ELEV =
NA
KOP=
280V
Max Angle =
55" @ 7400'
Datum ho
10915
Datum TVD =
6900' SS
Pre -rig P&A
CSG, 72# / 68#, L-80 / K-55, D = 12.347" 3982'
Minimum ID = 2259" @ IN.
AVA BPL NIPPLE gw5°
�pa0, C
E -line: Set CIBP @ -10,300' MD
Pull GLV from ST #6 at 10,259' MD
CT: Pump 71 bbl cement plug into
tubing and IA
E -fine: Jet cut tubing at 9,000' MD
19-5/8" CSG, 47#, L-80, D = 8.681" 1
12-7/8' TBG -PC, 6.5#, L-80,.0058 bpf, D = 2.441" 1
PERFORATION SUMMARY
REF LOG: ZDL/CtUGR DA ON 02/24/87
ANGLE AT TOP FERF: 21" @ 10668'
Note: Refer to Production OB for historical pert data
SIZE
SPF
INTERVAL
Opn/Sgz SHOT
SQZ
4"
2
10668 - 10682
O 06/05/87
28231
4"
2
10688- 10698
O 06/05/87
2-1/8"
1
10735-10739
O 10/15/87
FM ID
2-1/8"
1
10750- 10755
O 10/15/87
8317
2-1/8"
1
10757 - 10763
O 10/15187
0
2-1/8"
1
10771- 10773
O 10/15187
27
2-1/8"
1
10775-10777
O 10/15/87
6
2-1/8"
1
10783-10788
O 10/15/87
SO RK
2-1/8"
1
10794 - 10798
O 10/15/87
4"
2
10856 - 10878
O O6I05/87
4"
2
10898 - 10922
O 06/05/87
PBTD
7" LNP4 29#, L-80, .0371 bpf, D = 6.164"
OVERPULLS FROM 9800' -
L5-12 70600' ON 06124199 H 69' OF SHOT -OFF 2 7/8"
TAILPIPEON BTM
.,�F 2205' 2-7/8" CAMCO TRDP-1A TRSSSV. D= 2.312"
rt
CAMCO CHEMC"AL MANDRELS
MCMIRRY GAS LIFT MANDRELS
ST
MD
I TVDI
DEVI
TYPE
IVLVILATCHI
PORTI
DATE
2
2826
28231
11
1 FMiO
DV BK -2
0
3
5722
5064
44
FM ID
DV BK -2
0
03/10/91
4
8317
6756
46
FMiO
DV BK -2
0
5
9823
79601
27
FM K)
DV BK -2
0
6
10259
83521
24
FNFD
SO RK
20
03/10/91
6T I -J9-5/8" X 2-7/8" BROWN HB Pi D=
OF 7" LNR 10425'
MCMURRY PRODUCTION MANDRELS
701-12-7/8- AVA BPL NP, D = 2.259"
1862' - 10702' 2-7/8" CAMCO BLAST JOINTS, D =
10705' 7" X 2-7/8" BROWN FB PKR
ELMD
DATE 1 REV BY COMMENTS
DATE REV BY COMMENTS
03/02/87 ORIGINAL COMPLETION
08/18/14 PJC REFORMAT WBS- CLEANUP
12/29101 CFVTP CORRECTIONS
06/11/04 PMHVKAK 13-3/8" CSG CORRECTION
03/03/07 RL DATUM MJ
07/09/14 JRRJbD FULLED BPC SLV (07/08114)
08t04/14 DU/ PJC TREE CJO
1 CUTOFF TBG TAIL, D=2.568" 1
2-7/8" TALPPE w
LISBURNE U Nfr
WELL: L5-12
PBRmr No: 1870100
AR No: 50-029-21694-00
SEC 1, T11 N, R1 5E, 1668' FSL 8 16' FWL
BP Exploration (Alaska)
WB-LHEAD=
ACTUATOR=
OKB. B_EV =
BF. ELEV = --
KOP=
Max Angle=
DatumloD= _
Tatum TVD= 'SS
20"
PROPOSED L5 -12A 7FETY NOTES: YVBLANGLE>70 @_.
MAX DOGLEG: @— *^
I
13-3/8" CSG, 72# 168#, L-80 I K-55, D = 12.347" 3982'
Minimum ID
TOP OF 7" LNR -8800'
idro- x /- UKK LXPN L I P, U =
x 7' BKR FLEX LOCK HGR, ID =
MLLOUT WINDOW (L5 -12A) -895V - "
1 '-8950' 1
(/- xc-nKKHt LLAML IP, U= " r
7" x 5"13KR FLEX -LOCK HGP D = '
MCMURRY GAS LFT MANDRELS
ST MD
HES SWELL PACKERS
NO
SIZE TOPDEPTH MND
11
4-1/2"
TO 4-12"
9
4-12"
8
4-12"
7
4 1/2"
6
4-12"
5
4-12"
4
4-12^
3
4-12"
2
4-12"
1
3-12"
MCMURRY GAS LFT MANDRELS
ST MD
I TVDJ
DEVI
TYPE
[VLVILATCHI
11 4-1/2'
PORTI DATE
1
C
9 4-12"
C
8 4-12'
C
7 4-1/2'
2
6 4-112"
C
54-112"
C
4 4-1/2'
C
3
C
2 4-1/2'
C
1' 4-12'
C
4
5
TOP OF CEoS'!i
x 4-112" HES TNT PKR, D =
I/2" HES X NP, D= 3.813"
/2" HES X NP D = 3.813"
-12' VuLEG, D=_
X 5' TIEBACK, D =
'X4 -1/7'X017=
SLB FALCON FRAC SLEEVES
NO SIZE I TOP DEPTH
OIC MN D
12 4-1/2-1
C
11 4-1/2'
C
10 4-1/2'
C
9 4-12"
C
8 4-12'
C
7 4-1/2'
C
6 4-112"
C
54-112"
C
4 4-1/2'
C
3 4-1/2'
C
2 4-1/2'
C
1' 4-12'
C
'Pressure actuated frac Valve
4-112" BKR LOCATOR SUB, D =
4-112" x 3-12" XO, D = "
PBTD��
DATE REV BY 1 OOMM84i5
DATE
REV BY COMY84TS
03/02187 ORIGINAL COMPLETION
08/18/14
PJC REFORMAT WBS- CLEANUP
12/29/01 CWTP CORRECTIONS
12/02/15
JKN L5 -12A PROPOSAL
06111 /04 PLUFKA 13-3/8' CSG CORRECTION
03/03/07 RL DATUM MD
07/09/14 JRP/JMD PLLLED BFC SLV (07/08/14)
08/04/14 DW PJC TREE GO
LISBURNE UNIT
WELL: 1-5-12A
PEFW No:
AR No:
SEC 1, T1 1N, R15E, 1668' FSL 8 16' FWL
BP Exploration (Alaska)
a
m
c
CL
4)
m
J
G)
a
�
3
L
aa
Lo
Q
Q
Q
N
L
fq
3 N
J
J
d
cf
d
p
Z
JJJa
a
m
"'
0
f
I
U
m w
W n
O
C C N
0 r
G y (V
N �
h
W 0
a
I
f9
a
o
�
Z
I
U
Q
Qc
0
o
a t5
I
® a
2
lc
�'
>
l
yy C
vY U
I
I
rcr
K
ti L
C
4 iC A
m
I
i
m
K
n
I
II
I
m y
S
m
�
I
I
a
p
3 C o
v
w a
3
x
*—
co
m
w
,
c in
w
r
N
i W 3 1
m
N Y
m
= N O
♦ � O
I
I
I
5
a
m
A
Y
0
N
\
O
Y
A
a
(9
O
o 0 o
Qm
m
Z
~
N
O O O
Q
n
O
aY
C: N
Y W U
N
O
o
N
N
ppY
O
N
J
Y
q Q
3
ac o
N❑
v'�
wz
3
¢
z°�j7�a
I
�
c
m
o
o
o
C
4
N
oQ$'
ri
n o
S E
—
a
c
rn
o
u
o
Nr
an d
ua r'a33 o
o
u �a2
y
mLLLL
3
3 a
3
f
o
a
i
>
a
a
L o0
h
y
y
o n o 0 0 0 0 0 o p O o 0 0
a
O N
3q� g
E
a
n
m
W
P
C a
a t
m
N
P
m
m
m
_
W
W
O
m
N
m
m m
L
O
Q Y
U U
m
m
m
6
e
Ai
m
m
n m
m
ei
m r
O rc d w u
N
m
N
m
E E L m y
Q
tp
a
W
m
m
W
r r
N
r
J zM=v
m N
N w
m
PEE
m
N
O
m
m
m m
{
� a myLL yLL
ani
K
N
N
N
y°
N
N
N
CI
N
e + +
E EIL
a
r
n
n
n
r
n
n
m
n
m
n
m
m
r
m
I
n r
m m
Z
�
m
m
m
m
Q Q
d
m
m
m
U U
� �
m
m
m m
3
N N
m•
N
O
N
m m
E
Z C K
y y� LL LL
m
m
m
n
n
m
N
O
m
m
n m
I
H
(U7 (0 9
m
IF
I
1�
N
J
YI
V
m
m
`o
L
Nml
roi
m
n
m
w
m
v
v
�.
o
m
m 0
H n YI N N N iA
C7 C C C C L C
aaaaa
ao
�LL
m
;
E a sl
Q
Y
E 0 0 0 Q Q Q
0 0 0 0 0 0 0
�
E• o 3
�=
m m m o c 14 M
vn�
Q E zi
L J
D Lb L
J
Z -:j J
m O O O O O
w
m m OO
Q
a
O
E g
w at vv w m i
m w W w O O
p
E m a m
'
I
tl
L o0
h
y
y
o n o 0 0 0 0 0 o p O o 0 0
a
O N
3q� g
E
N W N N N N N N N N N N N N
N m n N n tN+l py n P O N O ly r
Ai ai ai r ai o vi v r m m ro ei
N m m F n p d r W N N N
m m m m m m m m m m n n n r
N N N N N N N N N N N N N N N
r N O O O IA m N m W m m' N
N n N m n N N N N O N N N
O m N m m M m P (V O r N m
r+ n m m r r m N m m N o
N N m It m m m n m Am
G
n N O O O m m N m' m m m N
N m d n m N d N N N d N N
W N d m m d d N O n m N O m
N N N N N N d m m m r m OR
2
m N N N N N N 0 n n Om
O d
A L
N
n N O a O =. O O O n n m w N m
K 1Z W a Oi OI Oi O) Qf m Oi m C N N
m m N e m e N N m N m m m N d d d
m o
E 16
� w O
O O
N O w m O 1D � O 1G J O C OO O G OO O O O
m m N W o W p o 0 0 0 0
a 0 0
m w • m O O N N Y m mw n m Q
s of m m °i 0
f Y m m w m
e fl
n
n
m
W
P
m
m
N
P
m
m
m
W
W
O
m
N
m
m m
m
O
Q Y
ri
m
m
m
6
e
Ai
m
m
n m
m
ei
m r
O
m
N
m
N
m
d
m
Q
tp
W
m
W
m
m
W
O m
O O
N
r
m
m N
N w
m
m
m
N
O
m
m
m m
{
N
N
N
N
N
N
N
N
N
N
CI
N
N N
a
r
n
n
n
r
n
n
m
n
m
n
m
n
m
r
m
n
m
n r
m m
N W N N N N N N N N N N N N
N m n N n tN+l py n P O N O ly r
Ai ai ai r ai o vi v r m m ro ei
N m m F n p d r W N N N
m m m m m m m m m m n n n r
N N N N N N N N N N N N N N N
r N O O O IA m N m W m m' N
N n N m n N N N N O N N N
O m N m m M m P (V O r N m
r+ n m m r r m N m m N o
N N m It m m m n m Am
G
n N O O O m m N m' m m m N
N m d n m N d N N N d N N
W N d m m d d N O n m N O m
N N N N N N d m m m r m OR
2
m N N N N N N 0 n n Om
O d
A L
N
n N O a O =. O O O n n m w N m
K 1Z W a Oi OI Oi O) Qf m Oi m C N N
m m N e m e N N m N m m m N d d d
m o
E 16
� w O
O O
N O w m O 1D � O 1G J O C OO O G OO O O O
m m N W o W p o 0 0 0 0
a 0 0
m w • m O O N N Y m mw n m Q
s of m m °i 0
f Y m m w m
e fl
n
n
m
W
P
m
m
N
P
m
m
m N
P
N
m
m
O
m
m
m
N
m
N
r
m
m
N
N
m
m
m
m
P
O
m O
m m
n
N
n
m
m
O
m
m
m
n
N
m
m Qi
w
L
m
N
P
m
m
N
N
N
m
m
m
N
O
m
m
m m
{
N
N
N
N
N
N
N
N
N
N
CI
N
N N
a
r
n
n
n
r
n
n
m
n
m
n
m
n
m
r
m
n
m
n r
m m
Z
N
m
m
m
m
m
m
m
m
m
m
m
m m
N
O
N
m m
n
m
m
m
n
n
m
N
O
m
m
n m
m
N
O
m
IF
m
1�
m
YI
V
m
m
m Vj
Nml
roi
m
n
m
w
m
v
v
�.
o
m
m 0
N W N N N N N N N N N N N N
N m n N n tN+l py n P O N O ly r
Ai ai ai r ai o vi v r m m ro ei
N m m F n p d r W N N N
m m m m m m m m m m n n n r
N N N N N N N N N N N N N N N
r N O O O IA m N m W m m' N
N n N m n N N N N O N N N
O m N m m M m P (V O r N m
r+ n m m r r m N m m N o
N N m It m m m n m Am
G
n N O O O m m N m' m m m N
N m d n m N d N N N d N N
W N d m m d d N O n m N O m
N N N N N N d m m m r m OR
2
m N N N N N N 0 n n Om
O d
A L
N
n N O a O =. O O O n n m w N m
K 1Z W a Oi OI Oi O) Qf m Oi m C N N
m m N e m e N N m N m m m N d d d
m o
E 16
� w O
O O
N O w m O 1D � O 1G J O C OO O G OO O O O
m m N W o W p o 0 0 0 0
a 0 0
m w • m O O N N Y m mw n m Q
s of m m °i 0
f Y m m w m
e fl
I
P
O
m
N
m
N
W
V
m
W
W
m
O
p
O
O
O
O
O
n
N
W
a
O
o
O
0
0
O
0
O
0
O
0
O
0
Op
OO
0
O
0
O
0
O
0
O
O
O
O
O
O
O
Q
F
e
O
� g
a
d d
Z
n
m
n
n
n
N
m
m
m
W
m
o
Io
a
n
n
W
n
m
m
m
W
W W Q
m J
W
O
m
N
m
n
(O
n
O
m
N
m
m
N
m
n
n
N
O
O
P
N
W
P
n
Wm
W
m
pmt
pN
3�
J
L p Ol
lh
CI
P
N
m
m
m
f
n
m
m
W
m
W
O
O
O
O
O
N N
d g
m n
n
n
n
n
n
n
nN
_E
n
n
w
n
n
n
n
J J F W
W
W
n
N
m
W
N
P
N
m
m
m
n
N
p
M
O
Q
m
P
m
1+l
N
Q
W
W
W
m
N
m
W
W
N
W
C 0
C m
W
N
m
P
O
N
N
N
N
N@
Z2N
O
O
O
O
O
O
t N
m
N
ry
N
ry
N
ry
ry
N
(V
N
N
N
(V
N
N
N
N
N
N
jt
m
mmm
N
w
m
m
m
m
m
m
w
m
w
m
w
m
w
m
e
Lo
m
N
m
m
W
N
W
m
N
m
m
N
N
1A
1d
N
N
N
d
u F
i
P@ = U
Q
m
m
Oml
O
N
m
W
m
Q
fPp
W
W
N
m
O
m
CPl
m
4 GGG ` q
O d U b
W
O
C
n
Cj
n
t7
P
C
W
r
n
n
!l
O
H
m
m
N
r
P
C
n
N
1n
n
r
W
N
m
IO
m
l7
W
�% • Y O' T W
m
m
m
W
W
O
O
N
N
Cl
t+i
Ol
W
P
P
P
Q
Q
P
ypd 0� C Z$
a b m
Iti
m
ci
ri
e
v
at
V
V
O
6
a
e
6
v
e
v
v
v
r
O
n
m
T
VI
P
W
m
n
N
Q
W
N
O
17
t`
n
m
H
Q
W
S
O
O
m
O
m
w
W
m
W
m
m
m
W
m
O
N
n
m
C!
W
n
W
m
W
O
O
N
O
n
n
n
n
m
m
m
m
W
m
W
w
CL J
�
F N
N
N
N
N
N
NN
N
lV
N
(V
N
N
N
N
N
H
N
N
m_
m
a
O
Q
N
t7
O
P
O
Q
O
O
CI
N
m
W
O
n
O
IL
m
EI
O
Q
N
n
Q
N
N
N
m
O
m
Y
n
P
m
It
m
O
O
7
m
m
W
N
O
m
W
m
Q
r
m
N
N
Cl
n
b
W
O
n
eC
P
t7
N
O
O
0
n
Irj
m
N
YI
m
!V
W
O
W
O
(O
1�
,
Co
W
W
O
O
p
N
m
P
Q
P
m
m
m
n
n
n
r
r
n
P
Id
N
m
O
n
N
m
W
W
r
r
N
m
OP
m
N
ly
N
P
n
O
Q
m
m
m
m
m
m
m
w
m
I
Q
W
O
vi
m
O
m
CI
m
O
Q
Q
P
P
Q
C
P
P
I
r
a
,—
"
a
a
m
w
g
o
m
umi
ro
r
Fi,
o
a
m
H
N
n
omi
m
m
m
m
Q
P
P
N
P
�
P
t+l
P
C1
Q
N
P
Q
O
Q
W
!f
N
W
0
W
pi
m
OI
O W
m
m
0
emi
m
W
Oi
emi
W
O
t7
W
m
m
1'l
0 t7
d 6
r
yM?�
W
N
O
O O
O
W
O
O
O
O
O
O
Q
O
m O
O
O
L
g
0
o
a
o
0
0
0
0
0
0
O
O
p
W
Q
T
m
O
m
IG
WW
J O
O
W
C
O
O
b
m
O
G
O
O
O
N
p
O
W
C
O
P
O
O
N
G
O
m
10
O
m
(O
m
m
Ci
m O
N
n
O
C
O
r
M
W
O
N
P i
p W
N
O
m
C[
a Oi
0
0
0
C
o
O
o
C
O
N O
n
m
W
W
W
W =I
gYg
E
0 0 v v d
m
2
0
0
0
0
0
0
0
0
0
0
Q
0
om
0
0
om
o
0
om
o
0
0
om
o
0
0
a
U
Z
o
0
0
0
0
0
0
0
0
0
0
0
0
�
a
o
$
a m 2 Q
m
n
m
e
o
m
o
m
w
e
w
m
m
w
N
E m
OI O
QO
O
Q
m
W
m
m
m
m
4Cie
y.
{Oy
O
O
tnV
W V n
n
n
A
n
n
n
n
n
r
n
n
InV
trV
r
n
J J H � W
2
O
m
A
O
n
w
W
O
r
N
W
W
N
W
V
0
N
m
N
m
Q
N
m
w
m
p0
W
Q
m
Q
m
0
m
r
m
m
lV
0
N
m
OJ
m
t�
N
mm
N
N
N
n
W
w
w
w
w
m
w
W
W
W
W
w
w
m
Y
c m n
m
o
`m
m
m
o
m
Cd
Ni
N
OI m
10
m
w
(C
Ni
m
0
m
O
m
m
m
m
m
m
m
lh
n
OJ
A
m
Ni0Ni
0
0
p
J g
i
11�
C
F 2 m O
O
n
d
n
m
m
n
{7
W
N
Q
ro
�
O
W
N2
W
N
W
CI
w
0
0
e
W
n
w
A
W
0
W
w
W
0
O
w
O
m
O
W
O
N
m
N
N
IL O
Sq ^''( N
N
N
N
N
N
N
N
Co
N
OT
Cf
C)
Cj
ly
17
Cj
O
Z
IL
N
o
O
0
O
0
m
om
o
O
o
O
m
N
o
O
o
O
n
m
o
O
m
O
r
m
o
O
N
Q
C]
a
0]
m
n
m
O
o
n
N
n
m
n
N
N
r
m
e
n
A
n
r
m
r
m
w
A
m
O
m
r
m
m
In
W
m
m
m
m
m
m
m
Ip
m
m
IA
m
m
fp
m01
m
G� m
ae
m
m
m
m
m
oe
m
m
m
m
m
m
i
m
m
R
0
Q
m
m
m
O
Q
m
m
n
O
O
w
w
m
0
m
n
A
A
n
m
0
m
m
m
m
W
w
W
W
W
w
W
OF 0
m
m
0
0
m
0
m
m
b
lC
m
0
m
m
0
0 I
i
(O
e
w
m
Q
w
e
W
m
m
n
m
m
Q
N
CI
m
e
m
Q
Q
N
m
O
m
N
A
Q
n
m I
0
e
N
N
m
m
IF
�
E
d
m
N
Q
Qm
m
V
Q
n
m
Omi
m
IOm
O
W
h
N
A
P
�
nw]
m
n
o
6
co
ao
M
n
m
ao
6
vi
ri
6
a
v
v
n
c
Q
L O U o
c
O Y mh m N
Z J J J d J
o
O
o m
m
o
m
O n
O
o
��
W
o
0
A W N
ml a ml
n
a
O
a
ml 0
N
Q
O
m m
ml �I
O
o
0
W
r O
A o
QI �1
m
m
O
o
�I
0
tb
Y
O=
w
m
o
o
a
o
w
w
wo
w
o
0
F
w
m
vO m Y Y
a` in33 �
Y
a
\O
7
a
o
W
V
m
o
0
0
0
0
0
o
Lung
m
p
o
0
o
U
u
o
y
a
0
op
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
op
po
0
0
0
0
0
0
0
a
�
U
Z
O
O
N
N
N
N
N
N
p
O
O
p
O
O
O
O
O
O
O
U
<
WF
e
K
E w
Q
a
@
m
m
m
m
n
n
A
n
m
m
O
m
m
co
m
m
o
V
0
m
0
N
N
fV
Cl
N
N
N
N
N
N
N
N
fV
N
N
N
N
N
N
M1
n
n
n
n
n
n
A
n
n
n
r
r
n
n
n
n
n
n
I
n
m
N
W
m
N
N
W
O
m
A
O
m
O
W
P
Nm
A
W
m
m
@
W
W
m
m
O
CI
y
{7
N
W
W
N
N
W
m
m
N@
m
W
O
m
m
N
P
W
N
@
m
O
0
y
r
O
P
w
N.
m
m
O@
P
N
m
A
m
m
N
W
W
m
P
P
W
W
N
O
W
m
OO
m
m
C Q
n
n
m
m
N
m@
Q
W
W
W
N
N
'
O
. O
W
m
F
g w
A
m
n
W
n
W
n
w
n
m
n
w
n
w
n
W
r
w
n
w
n
w
n
W
n
W
n
m
n
m
n
w
r
m
n
m
C
L
d
6 b U d
i
` C V
V m� tl
@
n
m
r
N
m
N
r
m
^
m
P
n
W
m
S
W
W
J
N
m
P
Ol
n
m
O
N
O
m
N
m
W
O@
m
N
U d C U tl
m
m
QW
O
O
O
m
W
H
W
N
A
N
W
N
W
N
m
m
N
O
n
m
m
m
1Y
m
N
m
W
m
N
r
r
m
N
P
r
W
m
m
m
n
m
W
W
N
W
N
W
N
W
m
W@
WN
N
N
A
m
W
m
m
P
m
m
W
N
n
d�
n F�
�
�
m
m
m
n
n
m
m
m
m
W
m
33
c
m
I
a
I
p
n
m
o
W
o
W
o
P
o
m
N
pb
m
o
w
o
N
m
m
m
n
m
m
m@
M
W
N
N
N
w
W
O
O
O
O
W
1n
m
m@
n
n
m
m
d
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
n
n
n
r
n
n
y F
oe
m
m
m
m
m
m
m
m
vi
m
m
m
m
m
m
a
y0
F
o
n
m
o
ut
o
n
o
P
o
m
m
N
W
o
m
O
o
W
r
p
N
m
Q
m
W
N
P@
@
m
W
Ol
N
W
O
m
O
W
W
m
m
N
W
P
m
N
A
m
W
O@
m
n
P
ut
Q
m
W
W
m
m
W
W
W
W
m
W
m
m
m
W
m
m
m
m
m
m
o F m
m
ao
ro
m
m
m
m
.o
m
m
ce
eo
m
m
m
m
m
m
I
z.
o
o
nm
IT
e
m
m
m
•'-
f
m
ni
6
lu
to
m
o
a
_
m
a
ui
w
ro
W
ro
W
m
W
m
m
ro
W
n
w
n
m
e r
o ut
r
W
n
w
n
W
n
W
r e
W
n
m
n
m
n
m
n
w
n
m
yy
ee
r
IM
a
Om Y uS Y N
Z J J J O.
=
L
N
O
w O
O
m
O
b
f
O
O
O
O6
O
O
e m n
O
m
O
O
N n
O
m
O
N
W O
Qm
�
m
1 N
S m
J
Q O
m
W
m
1
S
0
A
0
W
0
w
N
w_
n m I
m 'j
O
O
!J
O
O
O
(y 1
O
P
O
W
1 O
a
�
N
q�-
qC1-
r
n
®®
U 6 b
i 3 O
�.C.
6
0
0 0
0 0
0 0 0
o w
o
d o
d o
c o o
m m m
d m
m m
W
w
m
m m
of of
m m
m
pi pi
a 0
o c o 0 0
U
m m
N
h
a
0
0
0 0
0 0
0 0
0 0
0 0 0
0 0 0
0 0
0 0
0
0
0 0
0 0
0 0
0 0
0 0 0 0 0
0 0 0 0 0
4
g
e o 0 0
�
o
S
o
=
rc
v a
J
pmt pm, V
O
N
(O P'
m N
C r
W m W
i(1 O N
N
N N
N
pj
n
r wW
w N
0
w W N m m
N m N W m
W
N
[7 CI Cl !V
J� N E ^L
a N
ry ry
N N
N N N
N N
N
N N
N N
N N N
y I
N N
m
0w
m N
` O
y
N Nr P
N W
N m
n
W
W
O O
P
N
m
O n
m W P O m
O m W
O
0
Y
N m
P
n m
N N O
1A O
Ip
m
W m
P
N
P (O
A W
CI W N m
C O
p
m N
C W
F
N
N m
m l7
m m
m N
r m m
O N
m N
i0
N O
P P
n m
Cl W
W
N N N
`
c
W
I A n
o 0
n r
W w
0 0
n n
w W
D o c
n r n
w W w
0 0
n n
W W
0
n
0 0
n n
0 o
A n
c o 0 0 0
h n r n n
N
1A 1A
N N
N N N
N N
m
N
w m
N N
w W
N N
W W W W W
N N N IA N
R Y p
C j
d C U
W
N m
r b
N
y
V �
m m
t� r
W
W N m
m
N !O
n
O
n t7
O P
W N
O O n
P N n O m
U d K T q U
N
N m
P P
m m
O r N
n A m
m W
m m
W
N W
w W
N
O O
A te` w O
O N
N
N N
N N N
N N
N
h N
m m
Ip fd (p m 0
O
O
T
t7
N
N
m Ol
n P
m m
W O m
l7 N
N m
W N
n
W
m O
A A
m W
N
W O N r
W Vl P W A
O
O
N N e'i
tWf P
p
m N
m
m m r 0 0
CL N
4
Y 4
10p
m
39
c
W
,r
CL
j
o
0
m o
o
w n
m n
w P N
0 r
o N
m
o
o
w o
N o
W N
m m
m o o W A
o w o N r
m
r
r n
n n
n n n
r n
a
uoi m
uhi n
m n n n m
A
m
H m
m m
m m
m m m
m m
r
m
n n
m m
n n
n n n n n
m
e
O N
m m
W m m m m
a
O
O
m O
N
W A
W m
f P N
N m
O N
N P
O
W O
m
w N
W A
m PO O W A
m m
m
N P
G O
O O O
O r
P
0 P
m r
O lV m G
m
m m
m m
m m m
m m
m
m b
m 0
m
m m
m m
m m m
m m
m
m m
m m
m m m m m
z�
5 v
P P
� P
� P �
E _
a
J
P
r
S P
1� O
P 8
m m P
P N
N
N N
N N
N N N N N
ap
W
w W
r 1�
w w
m W N
w m m
N to
m m
I(f
m
N N
w
N N$
W
O
m
w m
m m C m
O
V m
p g
p
O
n
9 O
QE v o N QQ 3 j
�
IcIyy
W
�JI$�
N Q
O m
p
O O �p
O O O W
O O
OO
m
O W
O O W
O O h O O
Q
P I
O
O A
OO
CO m
N
OOm
O
m
YS
0
N N
w
M C!
w
'
P N N= w m 1wp
i
�-
.w-
8
O w N O O O
N m N N C Ci O
u
0
0
0
0
0
0
I
a
U
z
Q
0
m a
w
0 0 m
b W j Q
m m U
® U E r l
m E
c_
I
J m
❑ m
P L �
y
�
� C
m
9 m u u •
C �
e Y
W
u � u
m
W
W
n'
d
T
2
I
a y
m
m
m
m
a
m
m
o
O w N O O O
N m N N C Ci O
u
m m m m m m w
m m m IA N m
m� ro e m ro m
m n m Gmi C b N
w o o 0 0 0
I m N O m r O b
a m m m C N p O
n m m m
N@ N W N m W
g a m m m emi m
e.
a
0
0
0
0
0
0
0
w
J m
❑ m
W
W
O
m
W
W
g
m
m
m
m
m
m
o
�
of
of
m
m
N
of
v
m m m m m m w
m m m IA N m
m� ro e m ro m
m n m Gmi C b N
w o o 0 0 0
I m N O m r O b
a m m m C N p O
n m m m
N@ N W N m W
g a m m m emi m
e.
a
N
O
N
0
g
p
O
m
m
m
m
o
o
a E
@
L J❑ � C�'
y
Om
•
m N W N•
Z J J
C
W
o
m
a
0
9 0
00
o
m
60
0@
m
W I m
m
� m16
"
m
Q
L
n
m
ZSZ m
W
6
m
m m
C
.p
d O C
b
m
T
R
C.
O L q
u E
c�a` in33 o LL
m I
i
_Y
E
c c
d
jW >
'P
F5N
J d J J� J J J 33��33333 3�
0 0 J JI J' J' JI JI J' Jf JI JI JI
rrarr�tiv�-err W W �xv��rrr�-r rrrvrr
a
�
Y
y W P P N Y Oi pi W M Oi P C N Y C C] rti O Yf V IA 0 P 0 !7 N P P
O tJ K W O N P ' P W A W W N W 0 W O M t7 W W P P VI A W N
J1
w d
Q
I
�
U W
y N 4
rc �
E N O 3
M N O O O N W O N W N N P N W' WA W W N (O W N
N l7 W h W O A L• P O W N W W A P O O W Ip W W W A N W P
PNW W A b P
(t W W O O N W P W C! W A C1 W W N
L
O
L
O.
C U_ m
�
O
g Z W 0
O O
O p
� O O
O
O
O
_6 O O
O
O
4
d
Ix
T
d
Z
CL `)
m
m
o
CL
ry
J
a
W
m
�
�
a
C.
O L q
u E
c�a` in33 o LL
°
i
_Y
E
Y ti L
N m Z t C Y L t
P N 10 P W N N P N P 10 P N N P P N P
'
jW >
'P
F5N
J d J J� J J J 33��33333 3�
0 0 J JI J' J' JI JI J' Jf JI JI JI
rrarr�tiv�-err W W �xv��rrr�-r rrrvrr
a
Y
y W P P N Y Oi pi W M Oi P C N Y C C] rti O Yf V IA 0 P 0 !7 N P P
O tJ K W O N P ' P W A W W N W 0 W O M t7 W W P P VI A W N
J1
yJ W W W m W W W A m W W W m m W W h m W W W W 0 W W W W W W W
Q
I
�
U W
y N 4
N W
E N O 3
M N O O O N W O N W N N P N W' WA W W N (O W N
N l7 W h W O A L• P O W N W W A P O O W Ip W W W A N W P
PNW W A b P
(t W W O O N W P W C! W A C1 W W N
O N W b O m W
O.
C.
O L q
u E
c�a` in33 o LL
A
Q C O
N Q
C a❑ ry c I
Z J J J d J
G
O
p g
'O m 6 b N O N O
o W W
°p li 0 0 m O W O O W O
A y r ti a_ m r a a
t t O O p�p L O O L 0 0 L Q O O
O O Q Q O O N O Q p W W
o c N N h O N N o N N N V W
U bEE O O J J N N J J W J J H J m
n O p N ry p❑ h 0❑ N❑ m
F Y (9 N (9 N N N N N N f0 f9 N V) N F
N N O Vj IA O n m pj � h pj nj W
W O N h h Q W W W N Q N N O O1 m
3 gi' N W Ol N V1 W W Q Q W W W O N t7 Q
m W W W W Vj Ol of Q Q Q N N N b W m (p
N t�
C
D
O
O
❑ O W b N Q N W Q W W h OI b
q N W h ry Cl O N h h W O W h W N
O t7 N N h O O O O W N` Q O W N
N (V (V N N N N N ri Y Y Y Y 7 vi
f
Ch] m V n m N b N b Q N 0 0 n m IWp
W W y N p m N 6 b O Pi h O N 6
aN N N W W N h
1� h W W W W W W W h
r
' h n h h T m b W m m m m m 0 W
N O O O O O O O O O O O O O O O O
a W O O O O O O O O O O O O O O O O
M W W 0 W 0 0 0 W OI N W�� Cl W 0 OWi
f
North America - ALASKA - BP
Lisburne
Lis DS 05
L5-12
Plan 1-5-12A
1-5-12A wp06
Anticollision Summary Report
02 December, 2015
riFag
BAKER
HUGHES
by BP FORM
Anticollision Report BAR
HUGH
Company:
North America - ALASKA - BP
Project:
Lisburne
Reference Site:
Lis DS 05
Site Error:
O.00usft
Reference Well:
L5-12
Well Error:
O.00usft
Reference Wellbore
Plan L5 -12A
Reference Design:
_5-12Awp06
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1_5-12
1_5-12A @ 69.10usft
1_5-12A @ 69.1 Ousft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
L5 -12A wp06
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
To
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
8,700.00 to 13,996.00usft Sun Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,594.91 usft Error Surface:
Elliptical Conic
Survey ToolPrognm
Data 12=015
From
To
(usft)
(usft) Survey (Wllbom)
Tool Name
Description
59.10
8,912.85 1 : Schlumberger GCT multishot (LS -12)
GCT -MS
Schlumberger GCT multishot
8,912.85
8,950.00 L5-12AwpO6 (Plan L5 -12A)
GCT -MS
Schlumberger GCT multishot
8,950.00
9,400.00 L5 -12A wp06(Plan L5 -12A)
INC+TREND
Inclinometer +known an trend
9,400.00
10,912.00 L5-12Awp06(Plan L5 -12A)
MWD
MWD- Standard
9,400.00
10,912.00 1-5-12A wp06(Plan 1_5-12A)
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
10,912.00
12,410.00 L5-12Awp06(Plan 1_5-12A)
MWD
MWD -Standard
10,912.00
13,996.00 L5 -12A wp06(Plan L5 -12A)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
Summery
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
She Name
Depth
Depth
Distance
(usft(
from Plan
Offset Well - Wellbore -Design
(usft)
(usft)
(usft)
(usft)
Lis DS 05
1_5-04 - 1_5-04 - LSD4
Out of range
1-5-08 - 1_5-08 - 1_5-08
Out of range
1-5-12-1_5-12-L5.12
9,402.13
9,400.00
49.47
221.95
-127.25
FAIL - Major Risk
1-5-16 - L5 -16A- 1.5-16A
Out of range
1_5-16 - LS -16A- Plan #2
Out of range
LS -18 - L5-18 - L5-18
Out of range
L5.24 - 1_5-24 - L5-24
Out of range
1_5-26 - L5-26PB3 - L5 -28P83
Out of range
1222015 11:01:44AM Page 2 of 3 COMPASS 5000.1 Build 61
BP EARN
by Anticollision Report BA
NUGM
Company:
North America -ALASKA - BP
Project:
Lisburne
Reference Site:
Lis OS 05
Site Error:
0.00usft
Reference Well:
1.5-12
Well Error:
0.00usft
Reference Wellbore
Plan 1-5-12A
Reference Design:
1.5-12A wp06
Local Coordinate Reference:
ND Reference:
MO Reference:
Norm Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1-5-12
1_5-12A @ 69.10usft
LS -12A @ 69.10usft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCPi
Offset Datum
Reference Depths are relative to 1-5-12A @ 69.10usft Coordinates are relative to: 1-5-12
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
Central Meridian is 150° 0'0.000 W - Grid Convergence at Surface is: 1.66°
'600-
400-
200-
C)
00-
400'200-
2
EI
Ladder Plot
0 2000
$ L4 -12,L4 -12,L4 -12V3
$ LSO1,L5-01, L5-01 V1
$ LS -04,L5 -04,L5 -04V7
'�f• L5-05,L505,L5-0SV1
un" L5-D8,L5-08,L5-08V1
$ L5 -09,L5 -09,L5 -09V1
$ LS-12,L5-12,LS-12V1
L5 -13,L5-13, L5-13 Vl
4000 6000 8000 10000 12000
Measured Depth (2000 usftlln)
LS -16, L5-16A,L5-16AV3
-dr L5-16,LS16A,Plan#2V9
$ L5-16,L5-i6AL1,L5-16ALl V5
$ L516,L5-16ALlPB1,L5-16AL1PB1 V1
$ L5-16,L5-16AL2,L5-16AL2V7
-@- L5-16,L5-16AL2, Plan#2 V18
-�- L5 -17,L5 -17,L5 -17V1
-i- L5-17,L5-17A,L5-17AV13
-!E LS -21,L5 -21,L5-21 V1
-I- LS -23,L5 -23,L5 -23V7
$ 1-5-24, LS -24, L5-24 V1
L5 -25,L5 -25,L5 -25V1
LS-26,LS-26,L5-26 V3
$- 1.5-26,L5-26PB1, L5-26PB1 V71
$ LS -26, L5 -26P82, L5-26PB2V13
-r- 1-5-26,L5-26PB3, LS-26PB3V5
1222015 11:01:44AM Page 3 of 3 COMPASS 5000.1 Build 61
I
I
I
1
1
1 I
I
I
1
I
I
i
1
i I
_J
_J
_I
_J ___
____i___ -y____
___i_
1
I
I
i
I
I
I
1
{
1
I
I
1
1
I
I
I
1
1
I
I
I
I
I
I
I
I
I
1
1
I
1
I
I
1
1
I
I
I
I
1
I
I
1
1
I
1
1
1
1
1
I
I
1
1
I
I
I
I
1
1
1
1
I
1
1
1
I
1
I
I
1
1
1
1
I
1
1
1
1
I
I
1
1
I
I
I
1
1
I
I
I
I
1
I
I
1
I
I
I
I
I
1
1
I
I
I
1
I
1
I
I
I
I
I
I
I
1
I
1
I
1
1
0 2000
$ L4 -12,L4 -12,L4 -12V3
$ LSO1,L5-01, L5-01 V1
$ LS -04,L5 -04,L5 -04V7
'�f• L5-05,L505,L5-0SV1
un" L5-D8,L5-08,L5-08V1
$ L5 -09,L5 -09,L5 -09V1
$ LS-12,L5-12,LS-12V1
L5 -13,L5-13, L5-13 Vl
4000 6000 8000 10000 12000
Measured Depth (2000 usftlln)
LS -16, L5-16A,L5-16AV3
-dr L5-16,LS16A,Plan#2V9
$ L5-16,L5-i6AL1,L5-16ALl V5
$ L516,L5-16ALlPB1,L5-16AL1PB1 V1
$ L5-16,L5-16AL2,L5-16AL2V7
-@- L5-16,L5-16AL2, Plan#2 V18
-�- L5 -17,L5 -17,L5 -17V1
-i- L5-17,L5-17A,L5-17AV13
-!E LS -21,L5 -21,L5-21 V1
-I- LS -23,L5 -23,L5 -23V7
$ 1-5-24, LS -24, L5-24 V1
L5 -25,L5 -25,L5 -25V1
LS-26,LS-26,L5-26 V3
$- 1.5-26,L5-26PB1, L5-26PB1 V71
$ LS -26, L5 -26P82, L5-26PB2V13
-r- 1-5-26,L5-26PB3, LS-26PB3V5
1222015 11:01:44AM Page 3 of 3 COMPASS 5000.1 Build 61
LAI — —1 —
I
7`1 ` C
�- IFS.
N I g
�,.SII gdl
� I
r y
S' K
2 p
s
--r
(u!/)jsn 000 (+)gUON/(-)lllnog
rM
o J 3o a"
oEr-a"^c
❑
!q3 � ❑000a
w
g u^
d Sm
3i�8'e'hffi�„S&3:8r8:3bi3��
s9S9 a 18-888888888888888
$ 9z naoa' cu8of o
g���� � rx� I�oa�sse<eeoeev�em�
� u 'n n a '�wo -o 000 ool0000 qo
a � ,n II 3•-gvo93�mx', .��+888m ',"`�'�gg�m
Nil
zg �� 22 K K;q Zm Ge87��vvmm
-A-%U4gAgY$-Ngtg
�g mmssm�s��sam�s�o�
�_ �sNssssemsssss�so= r r r ve w m e P
(u[Tsn OS!) 43d3Q M311JOn Dray
o a ❑
� �
y 5,1a
Sd I
f
Q -
� g
8geow�iii$���egNoe ?
I
�� � rc
F
-
I
S1�ooN"�.i❑o8ro❑`e'm'om'�
'K
�-lJ�
Gao 91=O...... .....c
o
_
� ��:fssJJ J3�y5
¢FYNNNNNNNN NN NNNI—
X88888888'$$$$$080$6
88dS `bm'm88
�
$ 3`isa?za iEY. }`
SS
___—`---
�' .Sf aBSS
J'3
�m�3P"""`&..Qi •-"4lrmnrm�Po',
N
.
❑
–44
� �Si��'�"3
ryry ,y_1,��`�p{_6n9ru�eu�mm
� ^q8,8@8888
8
y 5,1a
Sd I
f
Q -
� g
I
-
I
J
P
oops:E '
N
i m
p
I _
I
�
I
I
.
❑
–44
o
elf
-
i
I
1#
_L
II
t_f
m W
ON
g�
®�� Vsa �CSRRR,^oSm � �Bm
o $$s.ama$$$$s.asas
���Rsa��moo�am8e�o
^�8S88m88 8'8'88
I
i I
Ng�g
Z
I F pa min
2'om�a
im �m0
vom..
£ u
e`s'm
I �oa
ae_rvmm..mee�o._mmm
rcnnn ������avi�wro
m F m9m�R'��`m6Ry�k?m�$
�SmmSmmm$
xmm�q$„$$$:xammRm$
I, F"d888888a8aaga8$a8
U
i
3 o p c � W
O1 p
O�
\ r C
'm8 � aaaaa
@o Ey�RyR P„ iiiCCC a
S m iili � � m gg mw
n \
agmSSBo$
3e o
Q
0
724:
723E
723C
7224
7216
7212
7206
7200
7194
7188
71621
71761
71701
7164(
7158(
O
7152(
7
8 7746(
U71aoc
O
m 71340
W
71280
71220
71160
71100
71040
709801
709201
708601
70800(
70740(
706800
70020[
70560C
705000
704400
gg Northing (400 usR/in)
S S S $ 8
00
00
00
N
a
00
a
J
00
J
J
DO
JO
e
m
y
m
10
00'
J
v
10
Q
10
000
-
1,
10
N
0
W
0E
D
L;.
i
0-- _
D
J
n
h
J
_
�
%
D
J
Lr,
r
7
7
J —
7
7
..
�._.....
7
�-
7
I
�
_
7
7
71
000
�
71
k
k
-r7(
7(
—�,...
I
000
7C
n
7C
N
�
7C
J
70
�os�
70
70
_—
�
(u!/llsn 004) gumquoNNj
724200
723600
723000
722400
721800
721200
E20600
'20000
'19400
118800
18200
17600
17000
16400
15800
O
15200
N
14600 p
14000 �
0
13400 y
W
12800
12200
1600
1000
0400
9800
9200
8600
8000
7400
5800
5200
5600
5000
N00
North America - ALASKA - BP
Lisburne
Lis DS 05
L5-12
Plan L5 -12A
L5 -12A wp06 plus 500' MD
Anticollision Summary Report
02 December, 2015
re W--
BAKER
HUGHES
EP
PS
by Anticollisiion Report BAKER
Ri®
HUGHES
Company:
North America -ALASKA -BP
Project
Lisburne
Reference Site:
Lis DS 05
Site Error:
0.00usft
Reference Well:
LS -12
Well Error:
O.00usft
Reference Wellbore
Plan L5 -12A
Reference Design:
1.5-12A wp06 plus 500' MD
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output error; are at
Database:
Offset TVD Reference:
Well 1-5-12
1-5-12A @ 69.10usft
L5 -12A (d 69.10usft
True
Minimum Curvature
1.00 sigma
EDM RSK - Alaska PROD - ANCPt
Offset Datum
Reference
1-5-12A wp06 plus 500' MD
Fitter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
Interpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
8,700.00 to 14,496.00usft Scan Method: Trev. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic
Survey Tool Program
Date 17/2/2015
From
To
(ueftl
(usft) Survey (Wellbore)
Tool Name
Description
59.10
8,912.851: Schlumberger GCT muftishot(L5-12)
GCT -MS
Schlumberger GCT multishot
8,912.85
8,950.00 1-5-12A wp06 plus 500' MD (Plan L5 -12A)
GCT -MS
Schlumberger GCT multishot
81950.00
9,400.00 L5 -12A wp06 plus 500'MD(Plan 1-5-12A)
INC+TREND
Indinometer+known a! trend
9,400.00
10,912.001-5-12A wp06 plus 500'MO(Plan LS -12A)
MWD
MWD -Standard
9,400.00
10,912.00 L5 -12A wp06 plus 500' MD (Plan L5 -12A)
MWD+IFR+MS-WOCA
MWD +IFIR +Mufti Station W/O Crustal
10,912.00
12,410.001.5-12Awp08 plus 500'MD(Plan 1.5-12A)
MWD
MWD -Standard
10,912.00
14,496.00 1-5-12A wp06 plus 500' MD (Plan 1-5-12A)
MWD+IFR+MS-WOCA
MWD +IFIR + Multi Station W/O Crustal
Sumrnary
Reference
Offset
Comm to
No -Go
Allowable
Sib Name
Measured
Measured
Centre
Distance
Deviation
Wanting
Offset Well - Weilbore- Design
Depth
Depth
Distance
(usft)
from Plan
(usft)
(usft)
(usft)
(usft)
Lis DS 05
1-5-08 - 1-5-08 - 1-5-08
LS -12 -LS -12-1-5-12
9,402.13
9,400.00
49.47
22184
-127.23
Out of range
FAIL -Major Risk
1 -5 -12 -Plan 1 -5 -12A -LS -12A wp06
10,675.00
10,675.00
0.00
446.89
-446.24
FAIL - Major Risk
1.5.16 - L5 -16A- 1-5-16A
1-5-16 - 1-5-16A- Plan #2
Out of range
LS -18 - LS -18 - 1-5-18
Out of range
Out of range
12/2/2015 1:47'06PM Page 2 of 3 COMPASS 5000.1 Build 61
.001 BID r/R\
by Anticollision Report
HUGH
Company:
Project:
Reference Site:
Site Error:
Reference Well:
Well Error:
Reference Wellbore
Reference Design:
North America - ALASKA - BP
Lisburne
Lis DS 05
0.00usft
1.5-12
0.00usft
Plan 1-5-12A
L5 -12A wp06 plus 500' MD
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 15-12
1-5-12A C 69.1 hush
1.5-12A @ 69.1Ousft
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to LS -1 2A ® 69.1Ousft Coordinates are relative to: 15-12
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
Central Meridian is 150° 0'0.000 W' Grid Convergence at Surface is: 1.66'
200-
c
3 150
UN
G
0
92
v 50-
0
0
Ladder Plot
I r I I
2500 5000 7500 10000
Measured Depth (2500 usRln)
L5 -08,L5 -08,L5 -08V1
$ LS -09,L5 -09,L5 -09V1
1-5-12,1-5-12,0-12VI
1--12, Plan 1-5-12A, L5-12A.wp06 V0
$- L5 -13,L5 -13,L5 -13W
LEGEND
1.5-15,1-5-15,1-5-15V1
-Ef- L5 -16,L5 -76,L5 -16V7
'dr L5-16.1-5-76A,1-5-16AV3
-i- L5-16,L5-16A,PIsd#2V9
6W L5-16,L5-16AL1,L5-16AL1V5
I 1
12500 15000
-A- LS-16,L5-16AL1PB1,L5-16AL1PB1V1
$ L-16,L5-16AL2,L5-1SAL2V7
L5-16, L5-16AL2, Plan #2 V 18
—f— L5 -18,L5 -18,L5 -18V1
$ L5-12Awp06plus500'M1)
1222015 1:4T06PM Page 3 of 3 COMPASS 5000.1 Build 61
I
1
1
1
I
1
1
l
1
I
I
1
1
1
1
I
I
1
I
I
I
1
1
1
1
I
1
I
I
1
1
I
I
I
I
1
_I
_J
_J
_J
1
1
I
1
I
I
1
1
I
I
1
1
1
1
1
1
1
I
I
I
1
1 I
1 I
1
I
I
I
I
I
I
I
I
I
1
I
I
I
1
I
1
I
_J
I
1
I
I
1
1
I
1
I
I
1
1
I
1
I
1
1
I
I
I
I
I
1
1
I
I
1
I
I
1
I
I
1
I
1
I
I
I
I
I
I
I
1
I
I
1
I
1
1
I
I
1
1
1
1
I
I
I
I
I
I
I
I
I
1
I r I I
2500 5000 7500 10000
Measured Depth (2500 usRln)
L5 -08,L5 -08,L5 -08V1
$ LS -09,L5 -09,L5 -09V1
1-5-12,1-5-12,0-12VI
1--12, Plan 1-5-12A, L5-12A.wp06 V0
$- L5 -13,L5 -13,L5 -13W
LEGEND
1.5-15,1-5-15,1-5-15V1
-Ef- L5 -16,L5 -76,L5 -16V7
'dr L5-16.1-5-76A,1-5-16AV3
-i- L5-16,L5-16A,PIsd#2V9
6W L5-16,L5-16AL1,L5-16AL1V5
I 1
12500 15000
-A- LS-16,L5-16AL1PB1,L5-16AL1PB1V1
$ L-16,L5-16AL2,L5-1SAL2V7
L5-16, L5-16AL2, Plan #2 V 18
—f— L5 -18,L5 -18,L5 -18V1
$ L5-12Awp06plus500'M1)
1222015 1:4T06PM Page 3 of 3 COMPASS 5000.1 Build 61
PARKER 272
BOP STACK
RAM TWE BOP: DUTCH LOCK DOWN FLANGE
SHAFFER LXT DOUBLE BOP 13 5/8"-5M
13 5/8"-5M STUDDED TOP
13 5/8'-5M RANGED BOTTOM o " _ o ANNULAR BOP:
W/(2) 14" UL2 OPERATOR, UPPER CAVITY ANNUL-SHAFFER LXT : 5/8--5M
AND (2) 14" PSLK W/BSTR OPERATOR,
LOWER CAVITY 13-5/8" SM STUDDED TOP
0 13-5/8" 5M FLANGED BOTTOM
DRILLING CROSS:
13 5/8"-5M FLANGED TOP
13 5/8"-5M FLANGED BOTTOM
W (2) 3 1/8"-5M SIDE OUTLETS
KILL LINE:
2-1/16" 5M FLEX HOSE
2-1/16" 5M X 3-1/8" SM D.S.A.
3-1/8" 5M RANGED MANUAL GATE VALVE
3-1/8' 5M FLANGED HYDRAUUC GATE VALVE
CHOKE LINE: RAM TYPE BDP:
3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M
3-1/8" 5M FLANGED HYDRAULIC GATE VALVE L13 5/8"-5M STUDDED TOP
13 5/8"- 5M FLANGED BOTTOM
3-1 /8" 5M FLEX HOSE W/(2) 14" UL2 OPERATOR
m
7H -
I
mFMC
PRUDHOE BAY DRILLING
BIG BORE WELLHEAD SYSTEM
PRUDHOE BAY,ALA!SKA
— 28.31
4 I/16-5000
0 0 4 1/16-5000 M00 120 GV
li 0
0
92.25
4 1/16-5000 M00 120 GV
1 0
—4 1/16-5000 M00 120 GV ACTe
0-
50.12 0 0
0 0
010
(� 4 1/16-5000 M00 120 GV
--
0'0
r
C
C
M
P
PRIVATE AND CONF INENiI ALNOT v[vi5i9xs o[ [nwiiax L
.•e,. _.m.,.� 4 1/16-5000 TREE sfMCrw.,,wyEs -
W/ 4 I/16-5000 WINGON"MILTON _
OM10002300i
Davies, Stephen F (DOA)
From:
Michie, Joshua <Joshua.Michie@bp.com>
Sent:
Thursday, January 14, 2016 3:32 PM
To:
Davies, Stephen F (DOA)
Cc:
Niedermeyer, James; Bajsarowicz, Caroline J
Subject:
PBU 1-5-12A (PTD #216-002): Question
Steve,
1-4-12 is currently one of our "Long Term Shut In" wells, and has not produced since November 2005. The well currently
has a production casing leak that would need to be repaired prior to being returned to permanent production. The well
is currently secured with a tubing tail plug at 10,459' MD, and although we have considered repair options, we do not
have plans at this time to return the well to production. Additionally, the entirety of the drillsite L4 is currently shut in
due to corrosion that was discovered in the production common line. Evaluation of line repairs is still ongoing. It is my
understanding Rule 3 in Conservation Order No. 207 applies to wells that are intended to be produced at the same
time. At such time it is found that it would be expedient to do the necessary repairs requisite to return 1-4-12 to service,
we recognize this would require requesting an exception to Rule 3. tf
y�.i
I hope this helps answer your questions. Please let me know if there is anything else you need. C
Josr
Joshua J. Michie, PE
Reservoir Engineer
BP Exploration Alaska
GPMA Reservoir Development
636C, tel: (907) 564-4323
From: Niedermeyer, James
Sent: Monday, January 11, 2016 2:32 PM
To: Michie, Joshua
Subject: FW: PBU 1-5-12A (PTD #216-002): Question
Josh,
Below is the note from the state.
James
From: Davies, Stephen F (DOA)[mailto:steve.daviesCalalaska.gov]
Sent: Wednesday, January 06, 2016 5:07 PM
To: Niedermeyer, James
Subject: FW: PBU 1-5-12A (PTD #216-002): Question
James,
Davies, Stephen F (DOA)
From: Davies, Stephen F (DOA)
Sent: Wednesday, January 06, 2016 5:07 PM
To: james.niedermeyer@bp.com'
Subject: FW: PBU L5 -12A (PTD #216-002): Question
James,
I notice that the planned PBU L5 -12A redrill will reach total depth in the SW 1/14 of Section 7, T11N, R16E, UM. Will
PBU L5 -12A conform with the spacing requirements of Conservation Order No. 207 which governs the Lisburne Oil
Pool?
What is the status of well PBU 1-4-12, and what are BP's plans for it?
Regards,
Steve Davies
Senior Petroleum Geologist
Alaska Oil and Gas Conservation Commission (AOGCC)
Phone: 907-793-1224
AOGCC: 907-279-1433
Fax: 907-276-7542
333 West 7`" Avenue, Suite 100
Anchorage, AK 99501
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If
you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware
of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov.
TRANSMITTAL LETTER CHECKLIST
WELL NAME: 124
PTD:
-/Development _ Service Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50 -
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
from records, data and logs acquired for well
(name on permit .
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
sam les are first caught and 10' sam le intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company— Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Companv Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, LISBURNE OIL - 640144 Well Name: PRUDHOE BAY UN LIS L5 -12A Program DEV—____--- Well bore seg ❑ I
PTD#:2160020 Company BP EXPLORATI�ALAASKA)_INC. Initial Class/Type DEV/PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑
Administration
1 /
Nonconven. gas conforms IQ A531,n5,03Q(1.1.A),(1.2.A-D) _ _
NH
1
Permit fee attached_ _ _ - - - - _ _ _ _
NA
2
Lease number appropriate....... _ ........ _ _ _ _
Yes
_ Surf Lop & Top Prod Int lie in ADL0028320; TO lies in ADL0028338._
3
Unique well. name and number _ _ _ _ _ _ _ _
Yes
4
Well located in. a. defined_ pool_ _ _ _ _ _ _ _ _ _ _
Yes
PRUDHOE BAY, LISBURNE OIL - 640144, governed by CO 207_
5
Well located proper distance from drilling unit boundary _ _ ...
Yes
_ CO 207, Rule 3; Thewell spacing unit shall be one producing well per governmental quarter section._ No
6
Well located proper distance from other wells _ _ _ _ _ _ _
Yes _
pay may be opened in a_well closer than 1,000 feet to the pay opened. in another well. or opened in a well _
7
Sufficient acreage available in. drilling unit. _ _ _ _ _
Yes
which. is closer than 500 feet to the boundary of the. affected area.
8
If deviated, is wellbore plat. included _ _ _
Yes _
If L5 -12A is drilled as planned, it will meet both criteria of the spacing requirements of CO 207..
'9
Operator only affected party. _ _ _ _ _ _ _ _
Yes _ _
because nearby existing well L4-12 is shut-in and in -operable due to a casing leak (it is not
10
Operator has appropriate bond in force _ _ _ _ _ _ _ _
Yes
"producing").and the planned pay interval within. L5 -12A will lie more than 1,000' from the
Appr Date
11
Permit can be issued without conservation order _ _ _ _ _ _
Yes
perforated intervals in 1.4-12.
12
Permit can be issued without administrative approval _ _ _ _ _ _ _
Yes
SFD 1/28/2016
13
Can permit be approved before 15 -day wait. _
Yes
14
Well located within area and strata authorized by Injection Order # (put 10# in. comments) (For
NA
15
All wells within 1/4. mile area of review identified (For service well only) _ _ _ _
NA
16
Pre -produced injector. duration of pre production less than 3 months_ (For. service well only)
NA
18
Conductor string provided _ _ _ _
NA_ _ _
_ Conductor set_ in PBU L5-12
Engineering
19
Surface casing protects all. known USDWs _ _ _ _ _ _
NA _
_ _ Surface casing set in PBU L5-12
20
CMT voladequate to circulate on conductor & surf csg _ _ _ _ _ _ _ _ _
NA
Surface casing set and fully cemented
21
CMT vol adequate to tie-in long string to surf csg
NA
22
CMT Will cover all known productive horizons _ _ _ _
No _ _
_ _ Productive_ interval will be completed with. uncemented sliding. sleeves and swell packers
23
Casing designs adequate for C, T, B & permafrost_ _ _ _
Yes
24
Adequate tankage or reserve pit _ _ _ _
Yes
Rig has steel tanks; all waste to approved disposal wells_
25
If. a. re -drill., has a 10-403 for abandonment been approved _
Yes _
_ PTD 1877010, Sundry 316-006_
26
Adequate wellbore separation proposed _ _ _
Yes
_ Anti -collision analysis complete; no major risk failures
27
If diverter required, does it meet regulations_ _ _ _ _ _ _ _
NA
Appr Date
28
Drilling fluid program schematic& equip list adequate
Yes
Max formation pres is 3599 psig(7.8_ppg EMW);_will drill w/ 8.5-10.7 ppg EMW...
VTL 2/10/2016
29
BOPEs,_do they meet regulation
Yes
30
BOPE_press rating appropriate; test to (put psig in comments)_ _ _ _
Yes
_ MPSP is 2711_ psig; will test BOPS to 4000 psig
31
Choke. manifold complies w/API RP -53 (May 84)_
Yes
_
32
Work will occur without operation shutdown. _ _
Yes
33
Is presence of H25 gas probable _ _ _ _ _
Yes
_ _ _ H2S measures required.
34
Mechanical condition of wells within AOR verified (For service well only) _ _ _ _
NA
35
Permit can be issued w/o hydrogen_ sulfide measures _ _ _
No
L5 -Pad. wells are 1-12S -bearing.. H2S measures are required,
Geology
36
Data presented on potential overpressure zones _ _ _ _
Yes
Planned mud weights appear adequate to control the operator's forecast of most likely pore pressures,
Appr Date
37
Seismic analysis of shallow gas. zones _ _ _ _ _
NA_
SFD 1/7/2016
38
Seabed condition survey (if off -shore) _ _
NA
39
Contact name/phone for weekly progress reports_ [exploratory only] _ _ _ _ _ _ _ _ _
NA_
Geologic Engineering Public
Commissioner: Date: Cooner: Dat Commissioner Date
la a c<..rfisai�N/Jy` z46—i