Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-053STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.260 D77s z/4�2v JAN I^79 i. Type of Request. Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well 0 Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing 0 Ch r Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: • Exploratory ❑ Development 5. Permit to Drill Number 197-063 3_ Address: P.O. Box 196612 Anchorage, AK 8. API Number 60-029-22754-60-00 ' 99519-6612 Stretigrephic ❑ Service ❑ 7. If perforating. B. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perorations require a spacing exception? Yes ❑ No 0 PBU S-43LI 9, Property Designation (Lease Number):10. Field/Pools: ADL 028257 PRUDHOE BAY. PRUDHOE OIL ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ih Effective Depth MD: Effective Depth TVD: MPSP (psi); Plugs (MD): j Junk (MO): 14061 8845 - 8887 8465 2520 8867 8498,9070,9077 Casing Length Size MD TVD Collapse Structural Conductor 80 20" 34-114 34-114 1490 470 Surface 3087 9-5/81, 34-3121 34-3066 5750 3090 Intermediate 9718 7" 31-9749 1 31-8963 7240 5410 Production Liner 4161 4-1/2" 9784-13945 8879- d3 8430 7500 Perforation Depth MD (ft): Peroration Depth TVD (ft): Tubing Size: I TLfth Gracie: Tubing MD (ft): 9807 - 13912 8889 - 8842 4-1/2" 12.6# 1W L-80 28-9089 Packers and SSSV Type: 4-12" Baker S-3 Packer Packers an S V MD (ft) and TVD (ft): 903218559 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary 0 Wellbore Schematic ® AilWelivass after proposed work. Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑ 14. Estimated Date for Commencing Operations: March 1, 2020 - 15. Well Status after proposed work: Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative. GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is We and the a herein will not Contact Name: McLaughlin, Sean be deviated from without prior written approval. ^ Contact Email: Sean.McLaughlin@bp.com Authorized Name: Mdaughlin, Sean M v Contact Phone: +1 907 223-6784 Authorized Title: Eng! eying Team d - CTD Authorized Signature: 1 Date: G ( Y 12,07-0 COMMISSION USE ONLY Conditions of approval: Notify Commission so that representative may witness Sundry Number: Plug Integrity ❑ BOP Test a-taMechanical Integrity Test ❑ Location Clearance ❑ —O Other: �o PC 2557 TB 3 S'6C516-51 FEB 0 a 7M Post Initial Injection MIT Req'tl? Yes 11113DMsw� No ❑ - Spacing Exception Required? Yes ❑ No (!� Subsequent Form Required: APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date: ORIGINAL Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. . — '70 /h t Forth and Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Sean McLaughlin ( by RWO/CTD Engineer Date: January 29, 2020 00 Re: S-43 Sundry Approval Well Type: Producer i Current Status: The well is currently not operable due to corrosion and multiple tubing leaks. Request: Sundry approval is requested for plans to restore tubing integrity. History and current status: Well S-41 was drilled as a multi lateral completion in 1997 with L-80 liner and tubing. The original tubing is still in the well. The well has a history of failing TIFLs. The well has had two tubing leaks since the well was originally completed. The first tubing leak was at station 1, and was squeezed in 2009. The well was operable from that point until 2014, when it failed another MIT -IA. The second leak was identified at station 2 and was patched. In 2017 The well was found to have IA pressure over normal operating limits, due to failed SO check valves. Slickline performed a caliper which indicated multiple areas of corrosion, with most severe penetration at 4645' MD. A plug was set at 8867' MD, and a CMIT-TxIA was performed in December of 2017 to 2395 psi. An attempt was made to set a dummy valve in station 3, with no success. A second plug was set above station 3, and the tubing was tested to 2417 psi. The source of TxIA is believed to be in stations 3 and 2. Proposed plan: 11 The CDR2 rig will swap the tubing to restore tubing integrity. MASP = 2520 psi. CDR2 BOPE will be configured as follows (BOP schematic attached for reference): • One Annular preventer • One Blind Ram -type preventer • Mud cross with outlets for choke and kill lines • One VBR preventer. Testing will be in accordance with State and BP policy of a 7 day BOP test. Testing will be 3500 psi high and 250 psi low for all components. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of both the current and proposed wellbore is attached for reference. Scope of Work: The primary objective of this RWO is to replace tubing to restore tubing integrity. Pre -Ria Prep Work: 1. V: PPPOT-T, PPPOT-IC. Cycle LDS. 2. F: CMIT- TAA to 3000 psi, OA Integrity test. 3. E: Cut Tubing at -8800' MD 4. F: CMIT-TxIA to 1000 psi. Circulate out well. 5. V: Install BPV. Install dry hole tree 6. O: Bleed WHP(s) to zero. Remove the well house and flow line. Install wellhead valves as needed. Install dry hole tree. Level the pad as needed. Proposed RWO Procedure: 1. MIRU. ND tree. NU and test BOPE to 3500 psi 2. Pull 4-1/2" tubing from pre -rig cut at -8800' 3. Run new 4-1/2" 13 -CR Stacker Packer Completion. 4. Freeze protect well. Set TWC. ND BOPE. NU and test tree. RDMO. Post ria Work: 1. V: Post RWO, install production tree 2. S: Drop B&R. LRS to set packer. Pull B&R. Set GLVs. Pull RHC. Pull WRP. 3. F A/SL: Circ Fluid. Set Packer. U -Tube FP. *I 1T-' _/� �o ZSbOS s 4. V: Tree work as necessary. Surface Reconnect 14 Sean McLaughlin CC: Well File RWO/CTD Engineer Joe Lastufka 223-6784 TREE= 4-1/16"CNV WELLHFAD=FMC MO ACTU _ATOR= BA OKB. B.EV = 68.1' BF. ELB/ = _ KOP= 1800' Max Angle = 98' @ 128(19' Datum MD= 9762' Datum TVD,= _ 8800'SS CONTOR, L-80, D = 8.835' -- 3121 • UNKNOWN (12/05/17) TOP OF A CBdElT (0123109 4-12' SC-WRP (12104/17) Minimum D = 2AS" @ 8498' 46 FLO-GUARD PATCH j .0152 hof. D (01/14109) H ? RA PP TAG 967$' I FISH - 2 RLR STEM ROLLERS (0926/09) 1 L PIOR, D = 3.675- (-I 9774' SXNP,D=3.813' 9797 XN NP, D = 3.725' 9799' ' VVLFG, D = 3.956'9606' RA PP TAG 9824' TOP OF 4-12' LNR 10059' 83 bpf, D = 6276' 1019W PERFORATION SUK#AkRY REF LOG: PDS JEWELRY LOG OF D9115/99 ANGLEATTOPPEW 68' Q 9807' Note: Refer 10 Production DB for historical perf data SIZE SPF I INTERVAL I Opn/Sgz I DATE SEE PG 2 FOR PERFORATION DATA I I i i S-43 L1 SAFETY NOTES: WELL ANGLE> 70 DEG 42 9920' RESTRICTION 2' BELOW STA#1' (ID=325-)— FISH- MISC PARTS FROM STA M (3124=)— -2-1-9—r-- 9758' ES CBu8JTM- ST MO ITVDIDLVI 07/31117 ZV/DMD GLVCJO(0729/17) TYPE VLV LATCH FORE DATE 7 3028 2977 18 K3G2LS DMY NT 0 07/29/17 6 5308 5144 19 KBC-2LS DAY M 0 07/29/17 5 6508 6279 18 KBG-2LS DFM M 0 04/30/07 4 7205 6991 18 KBG2LS DMY M 0 0729/17 3 8063 7756 20 KBG-2LS M 0 12/06/17 2 8W7 8172 21 KBG2LS "DMY M 0 03113/14 1 8952 8518 56 KBG-2LS -DFM Ni 0 0123/09 ' STA #1 - UMY w /EXTENDED PIG (BEHIND CMT SHFAT14 "STA #2 - DW w AXf aD@ PKG —STA #3 - MODFID OW, 12 LONGER w 1FRLCEN3 RS PKG 9021' 4-12• TES X NP, D = 3.813' 9037 7" x 4-12" BKR S-3 R(R, D= 3.875" 9065' 4-12' HES X NP, D = 3.813' 9O7T d-12" HPS X NP. D = 3 813' am T LOGGED 09/15/99 7- CSG F,LLOLIT WINDOW (S-43 Li) 9749' - 9761' 07AL• W RKR SFTTNr: RI V fI = 5 �,.w ---------------------- --------------------- S-43 L7 IS AN OH SLID LNR w /OUT LTP / HGR WELL NOT WL ACCESSIBLE 4-12'SLTDLMR,12.1T#,L-80, 13'. .0152bI)f, D= 3.958' 1 -17' X 4-12' TW S6 PKR, D = 3.868' 10070' 7-X4-12-TFN OTKs TGR, D=3.925- 4- 112' .925'4-112' ES CEMENTER 12884' MC f )cT a D= 3.885' = 3.958' 1380T DATE COF.RBNTS DATE REV BY COMAENTS8622A7ORGINAL COMPLETION 07/31117 ZV/DMD GLVCJO(0729/17) 12/15/11VVELL NAME OOWLCfION 12/18117 BSBAD FULLED PATCI-/SET V%W & FISH IFIEVBY 04!15/14MVDCUFWJ3: TJN 12/18/17 ZV/DMD GLV (70(12/06/17) 04/17/14 GLV CJO(O4/IV14) 11103115 GLV C/O(11101/15) 0724117 GLV GO (07/19/17) FRUCHOE BAY LM WHL: S-431 L1 PEFUT No: 197052011970530 An Fb: 50-029-22754-00 (W) S. T12K T12E. 1068' FN_ 8 77T FWL BP 6cploraltoo (Alaska) PERFORATON SI&WARY RIF LOG: PDS JEWELRY ON 09/15/89 ANGLEAT TOP PBiF: 66` @ 9807' Wte: Refer to Production DB for historical pert date SIZE SPF I KTER4AL I OpnGgz I SHOT I SOZ oe171/97 0111GINAL COMPLETION S43 L7 ZVIAO GLV CIO (0729/17) 4-12' I SLID 1 9807 - 13912 I O 1 D6/221071 04/15/14 PJC MN 1)CORR37ION S-43 ZVIJMJ GLVCJO(12J06117) 2- 4 106W - 1062D O D5/17/02 T 4 10645 - 10970 O 05/17)02 r 4 10710 - 10726 0 05/17)02 r 4 11640 -11690 0 05/17)02 r 4 11915 -11940 0 05/17102 2" 4 12010 -12085 O 05/17102 r 4 12100 -12250 O 09/16W T 4 12310 - 12490 O 09/1689 4-12' SLTD 12913 - 13805 O 06/22197 S-43 L1 ---------------------- �r I ---------------------F 5-43 L7 IS AN OH SLT'D LNR w TOUT LTP / NCR 1 WELL NOT WL ACCESSIBLE DATE REV BY COM. 14TS DATE REV BY COM.BdTS oe171/97 0111GINAL COMPLETION 07/31/17 ZVIAO GLV CIO (0729/17) 12/15111 PJC wEL NAAEcomcTIDN 12/18/17 B59JWD ft11.®R4TCWSETVA88FISH 04/15/14 PJC MN 1)CORR37ION 12/18/17 ZVIJMJ GLVCJO(12J06117) 04/17/14 WeVAC GLV aO(04/14114) 11103115 DJSlJMD GLV 00(11/01/15) 0724/17 JPK/JMD GLV CYO (07/19/17) PRLUFM BAY Lf r WELL: 5-431 L1 PEFW No: 197052011970530 AR No: 50029-22754-00 (60) 5. T12M T12E 1068' FNL & 77T FVC BP &pioratbn (Alaska) TREE = 4-1/16" CNV WELLHEAD= FMC ACTUATOR= BAMER OKB. ELEV = 68.1' BF. ELEV = 37.7 KOP= 1800' Max Angle = 98' Q 12809' Datum MD = 9767 Datum TVD= 88W SS 9-5/8' CSG, 40#, L-80, D TOPOFt4ce4wTlot a/09) 8817' 4-1/2'SC-WRP(12/04/17) 8887 S-43 Proposed L1 CEMFTfT SHEATH, D = 3.70'(01/23109) 8888"$980' .0152 bof, D = 3.958" 7" X 4-1/2' BKR ML PKR D = 3.875' 977,V 41/2'1$XNP,D=3.813' 9792' 41/7 HES XN NP, D= 3.725" 9799' 41/2' WLEG, D= 3.958" LN2 PERFORATION SLAWRY REF LOG: PDS JEWELRY LOG OF 09/15/99 ANGLEATTOPPB=F.68-@ 9807' Note: Refer to Production DB for historical cert data SEE PG 2 FOR PERFORATION DATA SAFETY NOTES: WELL ANGLE> 70 DEG @ 9820'. RESTRICTION 2' BELOW $TAXV (ID=3.25-)— FISH- MISC PARTS FROM STA #6 (3/24/06)"" 4-1/2' HES X NIP, D = 3.813' 7- HES'TNP Pi CR, ID =3.88' 4-1/2' HES X NIP, In = 3.813' 4-1/2" UMI Overshot 9021' 1—I4-1/2' FES X fes, D = 3.813 9032' 7" x 4-1/2" BKR S-3 FFR D = 3.875" 9065' 4-1/2" HES X NP, D = 3.813' An77' 4-1/2' H64 X NP D = 3 813' � ytJny Iia-iic wLw. u=�.ax 9088' ELMD TT LOGGED 09115P99 7- CSG MLLOUT WNDOW (S-43 L7) 9749'-9761- ----J, 749'-9761' --------------------- S-43 Lt IS AN OH SLT'D LNR w/OUr UP / HGR WELL NOT WL ACCESSIBLE D = 3.958" 10059' j -j7" TEBACK SLV, D = 5.374" 1 7' X 4-10 TlW S-6 R(R D = 3.868' =3�4� �ft� '�— DATE REV BY COMvIRM RATE REV BY CORNAMS 08/22197 ORIGINAL COMPLETION 07/31/17 ZV/JW GLV UO (07/29/17) 12/15/11 PJC WELL NAM= OORFIECTION 12/18/17 8SF/JM) RJLLEDPATCWSEr WRP 8 FISH 04/15/14 PJC MN 1) CORRECTION 12/18/17 ZV/JMJ GLVG/O(12I06/17) 04/17/14 VWPJMD GLV CIO (04/14/14) 11/03/15 DJS/JMO GLV 5/O(11/01/15) 07/24/17 JRVJMO GLV C/O (07/19117) PRUGH OE BAY LINT WELL: S-43 / L1 PEFUT No: 1970520 /1970530 API No: 50-029-2275400 (60) 15, T12N, T1 2E, 1066' FNL 877T FWL BP Exploration (Alaska) 12' HYDRIL 13-5/8" 5K PS GK ANNULAR BOP LATCHED HEAD 5K FLANGE CONNECTION 3-1/8" 5,0001 WP CAMERON TYPE F" GATE VALVE HYDRIL 13-518" 5k PSI MPL SINGLE GATE 3-1/8" 5,0001 WP FLANGED CONNECTION CAMERON HCR VALVE DRILLING SPOOL 1/16" KILL LINE 13-5/8"-5K PSI FLANGED 3°-5K PSI FLANGED OUTLETS HYDRIL 13-5/8" 5k PSI MPL SINGLE GATE FLANGED CONNECTION Carlisle, Samantha J (CED) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, February 4, 2020 12:56 PM To: Rixse, Melvin G (CED) Cc: Carlisle, Samantha J (CED) Subject: RE: PTD197-053, Sundry 320-059 - Please Rescind PBUS-431-1 tubing swap Mel, My apologies. Please rescind the sundry request for S -43L1 (PTD #197-053). If you need anything else, please let me know. Thanks! Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 1 Office: (907) 564-4091 Subsurface &Well ' bUn+rtaH;ib•RMtltf�.:nao. BP Exploration Alaska ) 900 E. Benson Blvd. I Room: 717B I Anchorage, AK From: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov> Sent: Tuesday, February 4, 202012:53 PM To: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Cc: Carlisle, Samantha 1 (CED) <samantha.carlisle@alaska.gov> Subject: PTD197-053, Sundry 320-059 - Please Rescind PBUS-43L1 tubing swap Joe, AOGCC requires only one sundry request for well work on PBU S-43 (PTD197-052). The sundry request for S-431-1, PTD197-053 which describes identical well work should be rescinded. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the! ntended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin Rixse@alaska.Rov). THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Sean M. McLaughlin Engineering Team Lead — CTD & RWO BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU S -43L1 Permit to Drill Number: 197-053 Sundry Number: 319-075 Dear Mr. McLaughlin: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogc c.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner V, a. DATED this Z &y of February, 2019. z �W 919 1 � 1 RB�M STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well 0 Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing 0 Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Curtent Well Class. Exploratory ❑ Development 0 5. Permit to Drill Number: 197-053 ' 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22754-60-00 ' 7. If perforating: B. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No 0 PBU SAX1 " 9. Property Designation (Lease Number): 10. Field/Pools: ADL 028257. PRUDHOE BAY. PRUDHOE OIL " 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (1t): Total Depth TVD(ft) : Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 14061 - 8845 8867 8465 2520 8867 8498, 9070, 9077 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 34-114 34-114 1490 470 Surface 3087 9-5/8" 34-3121 34-3066 5750 3090 Intermediate 9718 7" 31-9749 31-8963 7240 5410 Production Liner 4161 4-1/2" 9784- 13945 8879-8843 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 1 9807-1 8889-8842 4-1/2" 12.6# L-80 28-9089 Packers and SSSV Type: 4-1/2" Baker S-3 Packer Packers and SSSV MD (ft) and TVD (ft): 9032 / 8559 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary 0 Wellbore Schematic ® 13. Well Class after proposed work. Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑ 14. Estimated Date for Commencing Operations: May 1, 2019 15. Well Status after proposed work: Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG 11GSTOR 13SPLUG [3Commission Representative: GINJ ❑ Op Shutdown ElAbandoned 11 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name. Hartley, Josephine be deviated from without prior written approval. Contact Email. Josephine. HartleyCbp.com Authorized Name: Mdaughlin, Sean M Contact Phone: +1 9075644570 Authorized Title: En ineenng Team Lead - CTD & RWO Authorized Signature: Date: COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Ml-� Mechanical Integrity Test ❑ Location Clearance ❑ `❑ Other: rt)ee Kl� 1a��C `ji'TO YJS" �5 1 Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No 2K Subsequent Form Required: 16 • �! O �f APPROVED BYTHE �L Z` rq Approved COMMISSIONER COMMISSION Date 11 by ,� titi Form 10403 Revised 04/2017 ORIGINAL RBDMS FEB 1 2319 �1ri2nB� Submit Form and Approved application is valid for 12 months from the date of approval.y/�' /yr Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Josi Hartley RWO/CTD Engineer bp Date: February 18, 2019 0 Re: S-431_1 Sundry Approval Well Type: Producer Current Status: The well is currently not operable due to corrosion and multiple tubing leaks. Request: Sundry approval is requested for plans to restore tubing integrity. History and current status: Well S-41 was drilled as a multi lateral completion in 1997 with L-80 liner and tubing. The original tubing is still in the well. The well has a history of failing TIFLs. The well has had two tubing leaks since the well was originally completed. The first tubing leak was at station 1, and was squeezed in 2009. The well was operable from that point until 2014, when it failed another MIT -IA. The second leak was identified at station 2 and was patched. In 2017 The well was found to have IA pressure over normal operating limits, due to failed SO check valves. Slickline performed a caliper which indicated multiple areas of corrosion, with most severe penetration at 4645' MD. A plug was set at 8867' MD, and AA1T �xFA waso_In December of 2017 to 2395 psi. An attempt was made to set a dummy valve in s a1't on 3, wi no success. secon pug was set above station 3, and the tubing was tested to 2417 psi. The source of TxIA is believed to be in stations 3 and 2. Proposed plan: The All American Oilfield 111 pulling unit will swap the tubing to restore tubing integrity. MASP = 2520 psi. AAO 111 BOPE will be configured as follows (BOP schematic attached for reference): • One Annular preventer • One Blind Ram -type preventer • Mud cross with outlets for choke and kill lines • One Ram -type preventer dressed with Ram or VBR depending on what pipe is being ran/pulled. Testing will be in accordance with State and BP policy of a 7 day BOP test. Testing will be 3500 psi high and 250 psi low for all components. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of both the current and proposed wellbore is attached for reference. Scope of Work: The primary objective of this RWO is to replace tubing to restore tubing integrity. Pre -Rig Prep Work: 1. V: PPPOT-T, PPPOT-IC. Cycle LDS. 2. F: CMIT- TxIA, OA Integrity test. > 3. E: Cut Tubing at -8800' MD p \ 4. F: CMIT-TxIA. Circulate out well. 5. V: Install BPV. Tree Work u 6. O: Bleed WHP(s) to zero. Remove the well house and flow line. Install wellhead valves as needed. Install dry hole tree. Level the pad as needed for the pulling unit. Proposed RWO Procedure: L % 1 �OG�L 1. MIRU.NDtree. NU and test BOPE. hoyrr1D ice ohoyrg6y,,C_ ✓o 2. Pull Tubing. 3. Run new 4-1/2" 13 -CR Stacker Packer Completion. 4. Freeze protect well. Set TWC. ND BOPE. NU and test tree. RDMO. Post ria Work: 1. V: Post RWO Tree Work 2. S: Drop B&R. LRS to set packer. Pull B&R. Set GLVs. Pull RHC. Pull WRP. 3. F A/SL: Circ Fluid. Set Packer. U -Tube FP. 4. V: Tree work as necessary. Surface Reconnect Jos! Hartley CC: Well File RWO/CTD Engineer Joe Lastufka 564-4570 TREE= 4-1/16•CMV ACTLATOR= aAKtF( OTB. EL Bf =_ 68.1', BF. ELBt = 37.59 KOP= _ 1800' Max Angle = 98• @ 12809'O Datum MD= 9762-1#� Datum TVD= 88W SS D-_. 9-5/8' CSG, 40#, L-80, D = 8.835' F6H: 12 OF A DID HOLEFI DH2 ELEMENT DEPTH LIJOJOIAN (12/05M 7) Minimum ID = 2.468'@ 8498' 45 FLO-GUARD PATCH 1 45KB P14R ELEMENT LOST (12101/17) FISH - BP ELERU11TS (01/14/09) 9077' IBG.12.6#, L-80, .0152 bpf, D = 3.958' 9088' TAG I -I 9578' ROLLERS S-43 L1 SAFETY NOTES: WELL ANGLE> 70 DEG @ 9820' RESTRICTION 2- BELOW START (ID=326-)— FISH- MISC PARTS FROM STA #6 (324106)"' 2197' ash' tS CRENTETR 1 W HES HXO SSSV N, D = C.AS I FT MANDRELS ST MD TVD DEV TYPE VLV I LATCH PORT DATE 7 3028 2977 18 KBG-2LS DMY M 0 0729117 6 5308 5144 19 KBG-2LS DUY M 0 0729/17 5 6508 6279 18 KBG-2LS OW M 0 04/30/07 4 7205 6941 18 KBG-2LS DMY M 0 0729117 3 8063 7756 20 KBG-2LS M 0 12108117 2 8507 8172 21 KBG-2LS " DVY M 0 03/13/14 1 8952 8518 56 KBG-2LS 'DMY M 0 0123109 'SIA#I -UNY W/tx1[TLJCU I'1'`la L6Qanv �./n� anw�nl "STA #2 - DMY w /EXTENDED PKG —STA #3 - MODFED DMY, 12 LONGER w /FRUDE BERG PKG 9091' 4-12' HES X NP, 0=3.813' 9032' N 7'x4-12' BKR S-3 PKR. D = 3.875' 9055' 4-12• HES X NP, D = 3.813 - HES X 13• HESX NP, D=3.813' 9089' �4-12'VJLEG,D=3.958' 9086' - ELIrD TT LOGGED 09/15/99 7- CSG MLLOUT V NDOW (S-43 L7) 9749'-9761- 9704' BKRSETTNGSLV,D=5.250' 1-_---_---------------- X4-12-BKR ML PK;, D=3.875 9774' 4-12' HES X NP, D = 3.813' 9792' 4-1/2' HES XN NP, D = 3.725' 9799' 4-1/2' 1/VLEG, D = 3.958' 9808' TE _____________________ 00/22/97 ORIGINAL COMPLETION -443 L7 IS AN OH SLID LNR w/OUT LTP / HGR WELL NOT WL ACCESSIBLE ZV/JMD GLVUO(07/2Wl7) 12/15/11 PJC V1�LNAMECU%-EUnON BSEVhD RRLED PATCWSET VNRP8 F6H 4-1/2'SLTD LNf;12.6#,L-80, .0152bpf, D = 3.958' 12/18117 10059' -t7•TESACK SLV,D=5.374' TOP OF 4-i2•LNR 10059' 10065' 7•x4-12• rnv s -s Hvt D = 3.asa• L-80, .0383 bpi, D = 6.276' 10196' \ 10070' 7• X 4-12• TNV DTH --S HGR, D = 3.925' PE RFORATDN SLAMIARY uBJIHi REF LOG: PDS JEWELRY LOG OF 09/15199 LfEn 128U' CTC DCT CSG PKR, ANGLE AT TOP P9�: 68` @ 9807' D = 3.885' Note: Refer to Production DB for historical perf data - _ _ _ _SIZE SPF INTERVAL Opn/Sgz DATESEE: PG 2 FOR PERFORATION LYTTA - _ _4-12' LHR, 12.6#_ _ DATE REV BY CONNA94TS TE REV BY COATrEYTS 00/22/97 ORIGINAL COMPLETION 1/17 j12/18/17 ZV/JMD GLVUO(07/2Wl7) 12/15/11 PJC V1�LNAMECU%-EUnON BSEVhD RRLED PATCWSET VNRP8 F6H 04/15/14 PJC MN D CORRECTION 12/18117 ZV/JM) GLV CIO (12/06117) 04/17/14 W<HJRU GLV C/O (04114/14) 02/19/19 JNJ,MD ADDED DATES TO FISH/EDIT BF ELI 11/03115 DJS(JMD GLV CJO(11/01/15) 0724/17 JPWJMD GLV GO(07/19/17) PRUDHOE BAY UNIT VYH.L S-43 / L1 PERM! No: 1970520 /1970530 API No: 50.029-22754-00 (60) 5, T12K T12E, 1068' FN- 8 777' FAL BP Exploration (Alaska) PEWORATION SUMMARY REF LOG: PDS JEWELRY ON 09/15/99 ANGLE AT TOP PERF: 68" @ 9807' Note: Refer to Production DB for historical perf data SIZE I SPF I NTT3ZVAL I Opn/Sgz I SHOT I SOZ 07/31/17 S-43 L7 12/15/11 PJC WELL NAME OORBECTION 4-1/2-1 SLTD 1 9807 - 13912 I O 106/22/971 - 12/18/17 S-43 0417/14 V% GLV GO (04/14/14) 2• 4 10600 - 10620 O 05/17102 2' 4 10645 - 10670 O 05/17102 2' 4 10710 - 10726 O 05/17/02 2' 4 11840 - 11890 O 05/17/02 2' 4 11915 - 11940 O 05/17102 2' 4 12010 - 12085 O 05/17102 2' 4 12100 - 12250 O 09/16/99 2- 4 12310 - 12490 O 09/16199 4-1/2' SLTD 12913 - 13805 O 06/22/97 S-43 L1 of of ---------------------- --------------------- S-43 L1 IS AN OH SLID LNR w10UT LTP / HOR Ln� I WELL NOT WL ACCESSIBLE DATE REV BY COMM NTS DATE REV BY COMbBNBS 06/22f97 ORIGINAL COMPLETION 07/31/17 ZV/JAU GLV CIO (0729117) 12/15/11 PJC WELL NAME OORBECTION 12/18/17 BS6'JMD FULLED PATCFVSET VOW & FISH 04/15/14 PJC MN D OOF3€CTDN 12/18/17 ZV/JMD GLV C/O (12106/17) 0417/14 V% GLV GO (04/14/14) 02/19/19 JNJJMD ADDED DATES TO FLSWEDIT BF F31 11/03/15 DJSIJMD GLV C/O(11101/15) 0724/17 JPK/JMD GLV CIO (07/19/17) P UDHOE BAY UNR WELL: S-43 / -1 PERMIT No: 197052011970530 AR No: 50-029-2275400 (60) SEC 35, T1 2K T12E 1068' FKL & 77T FAIL BP 6iploration (Alaska) TREE= • 4-1/16' CMV WEU EAD= IMC ACTUATOR= BAKER OKB. ELEV = 68-V BF. ELEV = 37.2' KOP= 1800' Max Angle = 98" @ 12809' Datum MID = 9762' Datum TV D= 8800'SS ID= 7 S-43 Proposea L1 TOPOF IA CEMENT (01/23/09) 8817' 4-1/2"SGWRP(12/04/17) 8867 EMENT SHEATH, ID= 3.70"(01/23/09) 8885'-8990' / ' TBG 12.6#, L-80 .0152 bpf, ID = 3.958" 9088" RA PPTAG 9578' 7" X 4-1/2" BKR M- PKR D = 3.875" 9774' 4-1/2" HES X NP, —ID= 3.813" 9792' — 4-1/2" HES XN NP, D = 3.725" 9799' 4-1/2" WLEG, D=3.958" 9808' RA PP TAG 9824' TOP OF 4-1/2'LNR 10059' 7" CSG, 26# L-80-0383 bpf, D = 6.276" 10196' PERFORATION SUMMARY RE= LOG: PDS JEWELRY LOG OF 09115/99 ANGLEATTOPPE R-68'@ 9807' Ite: Refer to Production DB for historical pert data SFE PG 2 DATA SAFETY NOTES: WELL ANGLE> 70 DEG @ 9820'. ` RESTRICTION 2' BELOW STA#1' (ID=3.25-)— FISH- MISC PARTS FROM STA #6 (3/24/06)`"' HES X 4-1f2' HES X NIP, ID = 3.8t 3' F---144-1/2- x T'FES -W PKR, D=3.88 4-1/2" HES X NIP, ID = 3.813" 4-1/2" UMI Overshot 9021' 4-1/2' HES X NP, D = 3.813" 9032' T' x 4-1/2" BKR S-3 PKR D = 3.875" 9055• 4-1/2" HES X NIP, ID = 3.813" — 9077' 4-1/2' HES X NIP, ID = 3.813' 9089' 4-112" WLECi, D=3.958" 9088' ELM) Tr LocGED os/15/ss 7" CSG MLLOUT WINDOW (S-43 L1) 9749' - 9761' ------------------- --------------------- S43 L1 IS AN OH SLT'D LNRw/OUT LTP I HGR REV BY COMNCNTS WELL NOT WL ACCESSIBLE ZV/JMD GLV C/O (07/29117) 12/15111 PJC WELL NAM=CORRECi'DN 12118/17 BSEJMO PULLEDPATCFVSETWRP&F1SH 41/2"SLTDLNR12.6#,L-80, 12118/17 ZV/JMtD GLV CIO (12/06/17) 04/17/14 WK YJMD GLV CJO (04/14114) .0152bpf, ID = 3.958" 10059' 7" TIEBACK SLV, D = 5.374" 10055' 47-"-X4 -1/2" TMV S-6 WR D = 3.868" �I 10070" I 7" X 41/2" TMV DTH -S HGR D = 3.925" ;A 12884' CTG EXT CSG RCP, D = 3.885" W ------ 12.6#, L-80_0152 bpf, D = 3.958" 13807' - - - DATE I REV BY COMMENTS DOTE REV BY COMNCNTS 06/22197 JORIGINAL COMPLETION 07/31/17 ZV/JMD GLV C/O (07/29117) 12/15111 PJC WELL NAM=CORRECi'DN 12118/17 BSEJMO PULLEDPATCFVSETWRP&F1SH 04/15/14 PJC MN ID CORRECTION 12118/17 ZV/JMtD GLV CIO (12/06/17) 04/17/14 WK YJMD GLV CJO (04/14114) 11/03/15 DJS/JMD GLV VO (11/01/15) 07/24117 JRC/JMD GLV CfO (07/19117) PRUDHOE BAY UNIT WELL: S-43/1-1 PERMITNo: 197052011970530 AR No: 50-029-2Z754-00(60) SE:35. T12N. T12E, 1068' FNL & 777' FWL BP Exploration (Alaska) 1 2 3 4 4'_2^- 0 o G e A A T-815/is" SHENKAI SL 13-5M ANNULAR 6'-103/x' SHENKAI SL 13-5M DOUBLE RAM B B 8'-5' 4'--811/1s I, 1 �41/6�1 T -25/s" 5'- 12 C 1,-93' Xr 0 C oOG 10A GG CLOSING / OPENNING VOLUME (GAL) MIN IT EMS CLOSING VOL OPENNING VOL 0* 30° ANNULAR 23.59 1 17.41 D RAM 4.39 3.91 p HCR 0.40 0.40 NOTES: THE GONTENTSOF THIS ORIHINOj ARE THE PROPERTY OF MESTOIN JP Sc, T eaP 13-5M SOPS TACK InvoRaAnon In Tws ORAWNI3 IS FOR ENERGY SERVICES PORP ANY RERNGGWTI.c THIS MAERO NG A-000-75-002 _ dMNN MTE ` E TY 28ffeE12018 N.T.S. �M REFERENCEONLY AND IS NOT FOR DR NG WTNpff THE WRER4 RFAMI$$Ip1 oR KESTEfW TA"d 0 INTIFL RELEASE TV MR OIMer201S AgROVEO COTE SIZE MJP 011M.,2016 A SHEET 1 OF 1 O CO"STRI.CT ON EWRGYSBF ICESCORPIS STMOMY RRGHIERED. RN GEscRI=TIaN Er AVRo WTE 1 2 3 4 STATE OF ALASKA ElVG AL .,CA OIL AND GAS CONSERVATION COMM i- _SON REPORT OF SUNDRY WELL OPERATIONS IAY 2 .2014 1. Operations Abandon Li Repair Well ✓ ' Plug Perforations Lj Perforate Lj Other Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re-enter Suspended Well❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development 0' Exploratory ❑ Stratigraphic❑ Service ❑ 197-053-0 3. Address: P.O. Box 196612 6. API Number: Anchorage, AK 99519-6612 50-029-22754-60-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028257 PBU S-431_1 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 14061 feet Plugs measured None feet true vertical 8844.55 feet Junk measured See Attachment feet Effective Depth measured 13945 feet Packer measured 9032 feet true vertical 8843.08 feet true vertical 8558.59 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H-40 31 - 111 31 -111 1490 470 Surface 3091 9-5/8" 40# L-80 30-3121 30-3065.55 5750 3090 Intermediate 9722 7" 26# L-80 27-9749 27-8862.5 7240 5410 Production None None None None None None Liner 4161 4-1/2" 12.6# L-80 9784-13945 8879.27 - 8843.08 8430 7500 Perforation depth Measured depth 9807-13912 feet True Vertical depth 8889.15 - 8842.4 feet SCANNED MAY 2 2 U 14 Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 25-9089 25-8584.48 Packers and SSSV (type, measured and true vertical depth) 8558.59 9032 8558.59 Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 226 1090 1854 1675 232 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ❑✓ Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil L'Ij r Gas Lj WDSP GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Email Garry. Catron(a_BP. Com Printed Name Garry Catron Title PDC PE Signature Phone 564-4424 Date 5/9/2014 V,)C 5-/z6//4 1-0e F12011 RBCMS MAY 14 2015 Form 10-404 Revised 10/2012 Submit Original Only S -43L1 197-053-0 Junk Attachment SW Name MD Date Description IS -43L1 9077 1/14/2009 IBP Elements & Stiffiner Rin IS -43L1 9774 9/26/2009 2 Stem Rollers Daily Report of Well Operations ADL0028257 T/I/O = SSV/10/90. Temp = SI. IA FL (E -Line). AL SI @ casing valve, ALP = 1930 psi. IA FL @ 300'. 4/7/2014 SV, WV, SSV = C. MV = O. IA, OA = OTG. NOVP. 1430. *** WELL SI ON ARRIVAL *** (E -LINE: SET PATCH) INITIAL T/I/O = 1900/50/75 PSI RIH W/ HEAD/XO/ERS/WB/CCL/BAKER 10 SETTING TOOL/45 KB STRADDLE PATCH. 29.25 ME TO ME.; OAL = 53', FN = 1.38" GOT STUCK WHILE ATTEMPTING TO CORRELATE AROUND 8407' ABLE TO GET FREE AFTER RELAXING TENSION ON THE LINE. RAN SHOOTING PASS ONLY. MOVED SETTING DEPTH OF TOP ELEMENT TO 8500.7 DUE TO CCL RESPONSE (AVOID SETTING IN POSSIBLE COLLAR). PATCH SPECS: MAX OD = 3.70", MIN ID = 2.45", OAL = 35.36. CCL TO TOP ME=8.2' CCL TO STOP DEPTH = 8492.5' PATCH SET @ 8500.7 ME - 8529.9 ME TOP-OFTATCH @ 8497.9'. USING TUBING TALLY DATED 06/22/97 FOR CORRELATION IDENTIFIED WHAT SEEMS LIKE PARAFFIN ON TOOLS -ACQUIRED SAMPLE. FINAL T/I/O = 1900/50/75 4/10/2014 *** JOB COMPLETE - WELL SI UPON DEPARTURE - PAD OP NOTIFIED OF STATUS *** ***WELL S/I ON ARRIVAL*** )(patch tug/liner) R/U SWCP 4520 SET LLTP ( 3.65" od, 28"oal), S/D @ 8,494' SLM / 8,498' MD 4/13/2014 ***WSR CONT ON 4/14/14*** T/1/0=1933/19/114 Temp=S1 Assist Slickline load & Test (PATCH TUBING LINER) Pump 5 bbl meth spear, 230 bbls Crude down TBG. Pumped 1 bbl of meth and 8 bbls crude down IA to achieve 4/13/2014 MIT test pressure of 2500psi.****continue onto 04-14-14 WSR**** LHEAD= FMC ACTUATOR= BAKER OKB. E LEV = 68.1' BF. ELEV - 37.2' KOP = 1800' Max Angle = 98` @ 12809' Datum MD = 9762' Datum TVD = 8800' SS D = 9-5/8" CSG, 40#, L-80, D = 8.835' 3121' Minimum ID = 2.45" @ 8498' 45 FLO-GUARD PATCH 45 BOT FLO-GUARD PATCH, I M8'-8535' D = 2.45' (04/10/14) ✓ TOP OF IA CEuIENT (01/23/09) 8817' CEMENT SFFATH, D = 3.70'(01/23/09) 8885'-8990' 4-1/2' TBG,12.6#, L-80, .0152 bpf, D = 3.958' I 9088' FISH- BPE LEMENTS (01/14/09) —F RA PP TAG 9578' FISH- 2 RLR STEM ROLLERS (09/26/09) ? 7' X 4-1/2' BKR ML PKR, D = 3.875" 1-1 9774' 4-1/2' FE'S X NP, D = 3.813' 1-1 9792' FES XN NP, D = 3.725" 1--1 9799- /2" WLEG, D = 3.958' 1--L__9 808' 1 RA PP TAG 9824' TOP OF4-1/2' LNR — 10059' 7" CSG, 26#, L-80, .0383 bpf, D = 6.276" 1—{ 10196' PERFORATION SU L4kRY REI: LOG: PDS JEWELRY LOG OF 09/15/99 ANGLE AT TOP PERF: 68" @ 9807' Note: Refer to Production DB for historical pert data WMAM ll'.� . IWIEMML� SEB: PG 2 FOR PERFORATION DATA ST SA NOTES: WELL ANGLE> 70 DBS @ 9820'. SSA -(4, RES i vACTION 2' BELOW STA#1' (ID=3.25")"' FISH - L1 MISC PARTS FROM STA #6 (3/24/0 6)" LATCH 2199-5ca�m DATE = 3.813"F 22092SOV N, ID 3028 GAS LFT MANDRFLS ST MD TVD DEV TYPE I VLV LATCH PORT DATE 7 3028 2977 18 KBG-2LS DOME NT 16 04/14/14 6 5308 5144 19 KBG-21-S DOME NT 16 04/14/14 5 6508 6279 18 KBG-2LS DW NT 0 04/30/07 4 7205 6941 18 KBG-2LS DONE NT 16 04/14/14 3 8063 7756 20 KBG-2LS SO NT 24 04/14/14 2 8507 8172 21 KBG-2LS "DIY NT 0 03/13/14 1 1 8952 8518 56 KBG-2LS 'DIY IFT 0 01/23/09 - 5I A #1 - D11AW' w /tX 1 tIV.713) Fi(G (fil:}�ND G M T SFEA T M "STA #2 - DMY w /EXTENDED PKG (BEHND PATCH) 902V 4-1/2- HES X NP, D = 3.813- 9032' A 7" x 4-1/2" BKR S-3 PKR D = 3.875" 905V —F4-1/2'—FES X NP, D = 3.813" 9077' —14-1/2" FES X NIP, D = 3.813• { 908W -14-1/2' WLEG, D=3.958" 9086' SMD TT LOGG®09J15l99 7' CSG MLLOUT WINDOW (S-43 L1) 9749'-9761- 97W 749'-9761'9784' BKR SETTING SLV, ID = 5.250- S-43 L1 IS AN OH SLID LNR w/OUT LTP / HGR WELL NOT WL ACCESSIBLE 4-1/2'SLTD LWI2.6#,L-80, (--L 13945' D .0152bpf, = 3.958' 10059' 7' TIEBACK SLV , D = 5.374' 10065' 7" X 4-1/2" TIW S-6 PKR, D = 3.868' 10070' 7" X 4-1/2• TM/ DTH -S HGR D = 3.925" 12872' 4-1/2" ES CEMENTER 12884' CTC ERCT CSG PKR, D = 3.885" 14-1/2- LNR, 12.6#, L-80_0152 bpf, D = 3.958" DATE REV BY COMMENTS DATE REV BY COMbBNTS 06/22/97 ORIGINAL COMPLETION 04111/14 RRD PJC SET PATCH (04/10/14) 04/27/11 AH/PJC GLV CIO (04/24/11) 04115/14 PJC MN D CORRECTION 08/16/11 MCIW PJC GLV CIO- SET WRP (8/15 - 16/11) 04/17/14 WKP/JMD GLV C/O (04/14/14) 11/28/11 MSS/J GLV CIO (11/19/11) 12/15/11 JLJ/JKU I PULL WRP(11/17/11) 112/15/111 PJC I WELL NAME CORRECTION 13807' PRUDHOE BAY UNET WELL: S-43 / L1 PE RIFT ND: 1970520 /1970530 AR ND: 50-029-2275400 (60) SEC 35, T12K T12E; 1068' FNL 8 77T FwL BP Exploration (Alaska) S-43 L1 PERFORATION SIA"RY Rff LOG: PDS JEWELRY ON 09/15/99 ANGLE AT TOP PERF: 68` @ 9807' Note: Refer to Production DB for historical pert data SIZE I SPF I INTERVAL I Opn/Sgz I SHOT I SQZ S-43 L1 4-1/2-1 SLID 1 9807 - 13912 I O 106/22/97 2" 4 10600 - 10620 O 05/17/02 2" 4 10645 - 10670 O 05/17/02 2" 4 10710 - 10726 O 05/17/02 2" 4 11840 -11890 O 05/17/02 2" 4 11915 - 11940 O 05/17/02 2" 4 12010 - 12065 O 05/17/02 2" 4 12100 - 12250 O 09/16/99 2" 4 12310 - 12490 O 09/16/99 4-1/2" SLTD 12913 - 13805 O 06/22/97 [i:iiill IS AN OH SLT'D LNR w/OUT LTP / HGR WELL NOT WL ACCESSIBLE DATE REV BY COMVENTS DATE REV BY COWA34TS 06/22/97 ORIGINAL COMPLETION 04/11/14 RRLY PJC SET PATCH (04/10/14) 04/27/11 AH/PJC GLV CJO (04/24/11) 04/15/14 PJC MN D CORRECTION 08/16/11 mcm Pic GLV CJO- SET WRP(8/15 - 16/11) 04/17/14 VVKP/JMD GLV C/O (04/14/14) 11/28/11 LV>S/JMD GLV CJO(11/19/11) 12/15/11 JLJ/JWD PU L VVRP(11/17/11) 12/15/11 PJC WELL NAME CORRECTION PRUDHOE BAY UNIT VVELL: S-43 / L1 PERMT No: 1970520 /1970530 API No: 50-029-2275400 (60) SEC 35, T12K T12E, 1068' FNL & 777' FVVL BP Exploration (Alaska) NOT OPERABLE: Producer S-43 (PT& 1970520) Secured with Kill Weight1d Page 1 of 2 ,3-4q �q� Regg, James B (DOA) ",�� From: AK, D&C Well Integrity Coordinator[AKDCWellintegrityCoordinator@bp.com] Sent: Sunday, September 26, 2010 10:09 PM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; Engel, Harry R; AK, RES GPB East Production Optimization Engineer; AK, RES GPB West Production Optimization Engineer; Cismoski, Doug A; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, OPS Prod Controllers; AK, OPS GC2 Field O&M TL Cc: AK, D&C Well Integrity Coordinator; Sayed, Mohamed; Janowski, Carrie Subject: NOT OPERABLE: Producer S-43 (PTD# 1970520) Secured with Kill Weight Fluid Attachments: S-43 TIO Plot 09-08-10.doc; S-43.pdf All, Producer S-43 (PTD #1970520) has been secured with kill weight. The well has been reclassified as Not Operable. Pending completion of rig work on an adJacen we , diagnostics will be performed in an attempt to mitigate the sustained casing identified on 9/4/2010. The plan forward is as follows: 1. WIC: Once the rig has moved locations, reclassify the well as under evaluation 2. DHD; TIFL 3. Slickline: Set DGLVs pending TIFL results 4. Pumping: MIT -IA to 3000 psi, LLR if fails. Please call if you have questions or concerns. Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659-5102 Cell (907) 752-0755 Pager (907) 659-5100 Ext. 1154 From: AK, D&C Well Integrity Coordinator Sent: Wednesday, September 08, 2010 5:36 PM L�E . To: 'Maunder, Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy (DOA) <guy.schwartz@alaska.gov>'; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; Engel, Harry R; AK, RES GPB East Production Optimization Engineer; AK, RES GPB West Production Optimization Engineer; Cismoski, Doug A; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, OPS Prod Controllers Cc: AK, D&C Well Integrity Coordinator; Sayed, Mohamed; Janowski, Carrie Subject: UNDER EVALUATION: Producer S-43 (PTD# 1970520) Sustained casing pressure on the IA All, Producer S-43 (PTD #1970520) has been found to have sustained casing pressure on the IA. The wellhead pressures were tubing/IA/OA equal to 249/2200/0 psi on 09/04/2010. The well has been reclassified as Under Evaluation and placed under a 28 day clock.. The plan forward is as follows: 1. DHD: TIFL 2. Slickline: Set DGLVs pending TIFL results 10/6/2010 NOT OPERABLE: Producer S-43 (Prn,4 1970520) Secured with Kill Weightid Page 2 of 2 3. Pumping: MIT -IA to 3000 psi, LLR if fails A TIO plot and wellbore schematic have been included for your reference. <<S-43 TIO Plot 09-08-10.doc>> <<S-43.pdf>> Thank you, Torin Roschinger (alt. Jerry Murphy) Well Integrity Coordinator Office (907) 659-5102 Harmony Radio x2376 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 10/6/2010 PBU 5-43 PTD 197052 9/26/2010 TIO Pressures Plot 4,000 3,000 2,000 1,000 Well: S43 06112/10 06/19/10 06/26/10 07/03110 07/10/10 07117110 07124/10 07131110 08/07/10 08/14/10 08/21/10 08/28/10 09/04/10 — Tbg —i— IA —A OA DOA OOOA On • • WELLHEAD = FMC ACTUATOR = BAKER KB. ELEV = 68.1' BF. ELEV = 37.2' KOP - 1800' Max Angle = 98 @ 12809' Datum MD = 9762' Datum TV D = 8800' SS 9-5/8" CSG, 0 S -4 3 L 1 SAFETY :WELL ANGLE' (ID DEG @ 98201. RESTRIG 2' BELOW STA#1ID=3.25")*** FISH- MISC PARTS FROM STA #6 (3/24/06)*** 9-5/8" ES CMTR 2197' 2209 4-1/2" HES HXO SSSVN, ID = 3.813" GAS LIFT MANDRELS L-80, ID = 8.835" 1-1 3121' Minimum ID = 3.70" @ 8885' CEMENT SHEATH (TOP OF IA CEMENT (01/23/09) $$1T CEMENT SHEATH (01/23/09) gg$5`.gggp` I4-1/2" TBG, 12,6#, L-80_0152 bpf, ID= 3.958" I FISH: IBP ELEMENTS (01/14/09) I—I ? RA PIP TAG I FISH: 2 RLR STEM ROLLERS (09/26/09) 1 7" X 4-1/2" BKR ML PKR, ID = 3.875" 4-1/2" HES X NIP, ID = 3.813" 4-1/2" HES XN NIP, ID = 3.725" 4-1/2" WLEG, ID = 3.958" ( 9808' RA PIP TAG 9824' TOP OF TIW TIEBACK SLV, ID = 5.374" 7" X 4-1/2" TMj S-6 PKR, ID = 3.868" 7" X 4-1/2" TIW DTH -S HGR, ID = 3.925" 17" CSG, 26#, L-80_0383 bpf, ID = 6.276" I PERFORATION SUMMARY REF LOG: PDS JEWELRY LOG OF 09/15/99 A NGLE AT TOP PERF: 68 @ 9807' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3028 2977 SEE PAGE 2 KBG-2LS DOME INT 16 08/22/09 FOR PERF 5308 5144 19 KBG-2LS DOME BREAKDOWN 16 08/22/09 ST MD TVD DEVI TYPE I VLV LATCH PORT DATE 7 3028 2977 18 KBG-2LS DOME INT 16 08/22/09 6 5308 5144 19 KBG-2LS DOME INT 16 08/22/09 5 6508 6279 18 KBG-2LS DMY INT 0 04/30/07 4 7205 6941 18 KBG-2LS DOME INT 16 08/22/09 3 8063 7756 20 KBG-2LS DMY INT 2 8507 8172 21 KBG-21SO INT L—Ed 1 8952 8518 56 KBG-2LS *DMY INT *EXTENDED PACKING; BEHIND CEMENT SHEATH 4-1/2" HES X NIP, ID = 3.813" I 7" x 4-1/2" BKR S-3 PKR, ID = 3.875" 4-1/2" HES X NIP, ID = 3.813" 4-1/2" HES X NIP, ID = 3.813" 4-1/2" WLEG, ID = 3.958" 90$6' ELMD TT LOGGED 09/15/99 7" CSG MILLOUT WINDOW (S-43 L1) 9749'- 9761' BKR SETTING SLV, ID = 5.250" —" — 9807' TOP OF 4-1/2' SLTD LNR * S-43 L1 IS AN OH SLID \ LNR W/O LNR TOP PKR OR HGR. WELL NOT WL ACCESSIBLE BTM OF 4-1/2" SLID LNR 14-1/2"SLTD LNR,12.6#,L-80,.0152bpf, ID = 3.958" I 2884' H CTC EXT CSG PKR, ID = 3.885" ` 12913' ]-4TOPOF4-1/2" SLTD LNR ES CEMTENTER 12872' BTM OF 4-1/2" SLTD LNR 13805'— 4-1/2" SLTD LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 13$07' DATE REV BY COMMENTS DATE REV BY COMMENTS 06/22/97 ORIGINAL COMPLETION 10/04/09 ?/SV FISH 10/17/08 RRD/PJC SET IBP (10/11/08) 01/15/09 BSEISV PULL IBP/ FISH (01/14/09) 02/05/09 RLM/SV IA CMT SQZ/SHEATH (01/23/09) 03/04/09 KJB/SV I GLV C/O (02/21/09) 08/22/09 RPC/PJC GLV C/O PRUDHOE BAY UNIT WELL: S-43 L1 PERMIT No: 1970530 API No: 50-029-22754-60 SEC 35, T12N, T12E, 1068' FNL & 777' FWL BP Exploration (Alaska) • S -43L1 0 PERFORATION SUMMARY REF LOG: PDS JEWELRY ON 09/15/99 ANGLE AT TOP PERF: 68 @ 9807' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 01/15/09 BSEISV PULL IBP/ FISH (01/14/09) S-43 L1 RLM/SV IA CMT SOZ/SHEATH (01/23/09) U:3/04/U91 4-1/2" SLTD 9807-13912 O 06/22/97 S-43 2" 4 10600 - 10620 O 05/17/02 2" 4 10645 - 10670 O 05/17/02 2" 4 10710 - 10726 O 05/17/02 2" 4 11840 - 11890 O 05/17/02 2" 4 11915 -11940 O 05/17/02 2" 4 12010 - 12085 O 05/17/02 2" 4 12100 - 12250 O 09/16/99 2" 4 12310 - 12490 O 09/16/99 4-1/2" SLTD 12913 - 13805 O 06/22/97 DATE REV BY COMMENTS DATE REV BY COMMENTS 06/22197 ORIGINAL COMPLETION 10/04/09 ?/SV FISH 10/17/08 RRD/PJC SET IBP (10111/08) 01/15/09 BSEISV PULL IBP/ FISH (01/14/09) 02/05/09 RLM/SV IA CMT SOZ/SHEATH (01/23/09) U:3/04/U91 KJB/SV I GLV C/O (02/21/09) 08/22/09 RPC/PJC I GLV C/O PRUDHOE BAY UNIT WELL: S-43 L1 PERMIT No: 1970530 A PI No: 50-029-22754-60 SEC 35, T1 2N, T1 2E, 1068' FNL & 777' FWL BP Exploration (Alaska) BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 June 25, 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of S -Pad Dear Mr. Maunder, �3 JUL 0 12009 Enclosed please find a spreadsheet with a list of wells from S -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, �•y,v��� � rt" 4ca Torin Roschinger BPXA, Well Integrity Coordinator 0 • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) S -pad nat. 6/25/2009 Well Name PTD # Initial top of cement Vol. of cement pumped Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date it bbls ft na gal S -01B 1952020 0.25 NA 0.25 NA 2.6 5/30/2009 S -02A 1941090 0.25 NA 0.25 NA 1.7 5/25/2009 S-03 1811900 13.25 NA 13.25 NA 92.65 5/20/2009 S-04 1830790 0 NA 0 NA 0.9 5/25/2009 S -05A 1951890 0 NA 0 NA 0.9 5/26/2009 S-06 1821650 0 NA 0 NA 0.9 5/26/2009 S -07A 1920980 0 NA 0 NA 0.9 5/26/2009 8-08B 2010520 0 NA 0 NA 0.85 5/27/2009 S-09 1821040 1.5 NA 1.5 NA 9.4 5/31/2009 S -10A 1911230 0.5 NA 0.5 NA 3.4 5/31/2009 S -11B 1990530 0.25 NA 0.25 NA 1.7 5/27/2009 S -12A 1851930 0.25 NA 0.25 NA 1.7 6/1/2009 8-13 1821350 8 NA 8 NA 55.3 6/1/2009 S-15 1840170 0.25 NA 0.25 NA 3 6/2/2009 S-1 7C 2020070 0.25 NA 0.25 NA 2.6 6/1/2009 S -18A 2021630 0.5 NA 0.5 NA 3 6/2/2009 S-19 1861160 0.75 NA 0.75 NA 2.2 5/19/2009 S -20A 2010450 0.25 NA 0.25 NA 1.3 5/19/2009 S-21 1900470 0.5 NA 0.5 NA 3.4 5/25/2009 S -22B 1970510 0.75 NA 0.75 NA 3 5/19/2009 8-23 1901270 0.25 NA 0.25 NA 1.7 5/25/2009 S -24B 2031630 0.5 NA 0.5 NA 2.6 5/25/2009 S -25A 1982140 0.5 NA 0.5 NA 2.6 5/25/2009 5-26 1900580 0.75 NA 0.75 NA 3.4 5/26/2009 S -27B 2031680 0.5 NA 0.5 NA 2.6 5/31/2009 5-288 2030020 0.5 NA 0.5 NA 2.6 5/31/2009 S-29ALl 1960120 0 NA 0 NA 0.85 5/27/2009 5-30 1900660 0.5 NA 0.5 NA 5.1 5/31/2009 S -31A 1 1982200 0.5 NA 0.5 NA 3.4 5/26/2009 5-32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009 S-33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009 S-34 1921360 0.5 NA 0.5 NA 3.4 5/31/2009 5-35 1921480 1 0 NA 0 NA .85 in 5/31/2009 5-36 1921160 0.75 NA 0.75 NA 4.25 5/27/2009 5-37 1920990 1.25 NA 1.25 NA 11.9 i 5/27/2009 5-38 1921270 0.25 NA 0.25 NA 10.2 1 5/27/2009 5-41 1960240 1.5 NA 1.5 NA 11.1 5/30/2009 S-42 1960540 0 NA 0 NA 0.9 5/30/2009 5-43 1970530 0.5 NA 0.5 NA 1.7 5/28/2009 S-44 1970070 0.25 NA 0.25 NA 1.7 5/28/2009 S-100 2000780 2 NA 2 NA 21.3 5/29/2009 S-101 2001150 1 1.25 NA 1.25 NA 11.9 5/29/2009 5-102LI 2031560 1.25 NA i 1.25 NA 11.1 5/31/2009 5-103 2001680 1.5 NA 1.5 NA 11.9 5/18/2009 S-104 2001960 1.75 NA 1.75 NA 15.3 5/20/2009 5-105 2001520 4 NA 4 NA 32.7 5/20/2009 5-106 2010120 16.25 NA 16.25 NA 174.3 6/2/2009 5-107 2011130 2.25 NA 2.25 NA 28.9 5/18/2009 5-108 2011000 3.5 NA 3.5 NA 40 5/30/2009 S-109 2022450 2 NA 2 NA 21.3 5/30/2009 S-110 2011290 1 11.75 NA 11.75 NA 98.6 5/30/2009 5-111 2050510 2 NA 1 2 NA Me 5/30/2009 S-112 2021350 0 NA 0 NA 0.5 5/30/2009 5-113 2021430 1.75 NA 1.75 NA 22.1 5/18/2009 5-114A 2021980 1.25 NA 1.25 NA 10.2 5/30/2009 S-115 2022300 2.5 NA 2.5 NA 27.2 5/29/259-- S-116 2031810 1.5 NA 1.5 NA 13.6 5/28/2009 S-117 2030120 1.5 NA 1.5 NA 15.3 5/29/2009 5-118 2032000 5 NA 5 NA 76.5 5/28/2009 5-119 2041620 1 NA 1 NA 5.2 5/30/2009 5-120 2031980 5.5 NA 5.5 NA 67.2 5/29/2009 5-121 2060410 4.5 NA 4.5 NA 53.6 5/28/2009 5-122 2050810 3 NA 3 NA 21.3 5/29/2009 S-123 2041370 1.5 NA 1.5 NA 20.4 5/26/2009 5-124 2061360 1.75 NA 1.75 NA 11.9 5/26/2009 S-125 2070830 2.25 NA 2.25 NA 20.4 5/28/2009 5-126 20710970 1.25 NA 1.25 NA 15.3 6/1/2009 S-200 1972390 1.25 NA 1.25 NA 14.5 5/28/2009 5-201 2001840 0 NA 0 NA 0.85 6/19/2009 S -213A 2042130 2 NA 2 NA 13.6 5/29/2009 S-215 2021540 2 NA 2 NA 18.7 6/1/2009 - S-216 2001970 4.75 NA 4.75 NA 51 5/29/2W S -217 2070950 0.25 NA 0.25 NA 1.7 6/1/2009 S-400 2070740 2 NA 2 NA 9.4 5/28/2009 S-401 2060780 16 NA 16 NA 99.5 6/2/2009 5-504 0 NA 0 NA 0.85 5/28/2009 • WELL LOG ProActive Diagnostic Services, Inc. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE: Cased Hole/Open Hole/ Mechanical Logs and/or Tubing Inspection(Caliper/ VM The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) Coil Flag 22,Jan-09 S-431-1 EDE 2) Temperature Survey ,J }09 GNM4 r I j Signed Print Name: /9q -o6-3 50-029-2275460 1 Color Logi It �, 0 � ,- ,i k _ - Date . `2 0 2 PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)24548952 E-MAIL: rdsar-chorage@memoriLlog.com WEBSITE: vwimmerrnorvlog.com CADocuments and Sepings\Owner\Desktop\Tiansmit_BP.doex TPPF = d-1 /1 F" MN WELLHEAD= FMC ACTUATOR = BA KER KB. ELEV = 68.1' BF. EL EV = 37.2' KOP = 1800' Max Angle = 98@ 12809' Datum MD = 9762' Datum TV D = 8800' SS 1 9-5/8" ES CMT'R 1 9-5/8" CSG, 40#, L-80, ID = 8.835" 1 \, SAFETY NOTES: WELL ANGLE > 70 DEG @ 9820' Sw43L &> 90 DEG @ 9875'. 219T T I 10 1 3121' 1 Minimum ID = 3.725" @ 9799' 4-1/2" HES XN NIPPLE 4-1 /2" TBG,12.6#, L-80, .0152 bpf, ID = 3.958" 9088' RA RP TAG 1--1 9578' I T' X 4-1 /2" BKR ML PKR, ID = 3.875" 9774' 4-1/2" HES X NIP, ID = 3.813" 9792' 4-1/2" HES XN NIP, ID = 3.725" 9799' 4-1/2" WLEG, D =3.958" 9808' RA PIP TAG 9824' TOP OF TIW TIEBACK SLV, ID = 5.374" 10059' 7"X 4-1/2" 11W S-6 PKR, ID= 3.868" 10065' 7" X 4-1/2" TIW DTH -S HGR, ID = 3.925" Ff 10070' 7" CSG, 26#, L-80_0383 bpf, ID = 6.276" 10196' PERFORATION SUMMARY REF LOG: PDS JEWELRY LOG OF 09/15/99 A NGLE AT TOP PERF: 68 @ 980T Nnfa• PPfPr fin PrMijnfinn npt fnr hicfnrinni narF Mafia SIZE SPF INTERVAL Opn/Sqz DATE V LV I LTCH SEE PAGE 2 DATE 7 3028 2909 FOR PERF KBG-2LS DONE BTM 16 B REA KDOW N 6 5308 2209' H4-1/2" HES HXO SSSV N, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE V LV I LTCH FORT DATE 7 3028 2909 19 KBG-2LS DONE BTM 16 04/02/01 6 5308 5076 19 KBG-2LS DONE BTM 16 04/02/01 5 6508 6211 17 KBG-2LS DV BTM 0 04/02/01 4 7205 6873 19 KBG-2LS DOKE BTM 16 04/02/01 3 8063 7688 21 KBG-2LS DV BTM 0 04/02/01 2 8507 8105 25 KBG-2LS DV BTM 0 04/02/01 1 8952 8450 54 KBG-2LS S/O BTM 24 04/02/01 9021' -J4-1/2" HES X NIP, ID= 3.813" 9032' 7"x 4-1/2" BKRS-3 PKR, ID= 3.875" 9055 1'-14-1/2" HES X NIP, ID= 3.813" 907TJ-14-1/2" HES X NIP, ID = 3.813" I 9089' 4-1 /2" W LEG, ID = 3.958" 9086' ELMD TT LOGGED 09/15/99 7" CSG MILLOUT WINDOW 9749'- 9761' (S-43 L1) 9784' BKR SETTING SLV, ID = 5.250" 9807' T0POF4-1/2" SLTD LNR *S-43 L1 IS AN OHSLT'DLNR W/O L NR TO P PK R O R HGR. WELL NOT WL ACCESSIBLE. BTM OF 4-1/2" SLTD LNR 13912' /l 4-1/2"SLTD LNR,12.6#,L-80,.0152bpf, ID= 3.958" 1-1 13945' 12884' CTC EXT CSG R<R ID = 3.8 85" :7_ 12913TOP OF 4-1 /2" SLT'D LNR ES CMTR 12872' BTM OF 4-1/2" SLTD LNR 13805' 4-1/2" SLTD LNR, 12.6#, L-80, .0152 bpf, ID=3.958" 13807' DATE REV BY COMMENTS DATE REV BY COMMENTS 06/22/97 ORIGINAL COMPLETION 03/14/01 SIS-QAA CONVERTEDTO CANVAS 03/16/01 SIS -CS FINAL 03/26/02 CH/KAK I CORRECTIONS 05/17/02 ATD/KK JADPERFS MAY 3 0, 2DQ PRUDHOEBAY UNIT WELL: S-43 L1 PERMIT No: 1970530 0 , 1"'0 API No: 50-029-22754-60 Sec. 35, T1 2N, T12E BP Exploration (Alaska) PERFORATION SUMMARY REF LOG: PDS JEWELRY LOG OF 09/15/99 ANGLE AT TOP PERF: 68 @ 9807" Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 03/16/01 SIS -CS FINAL 03/26/02 CH/KAK 100RRECTIONS S-43 L1 4-1 /2" SLTD 9807-13912 O 06/22/97 S-43 2" 4 10600 - 10620 O 05/17/02 2" 4 10645 - 10670 O 05/17/02 2" 4 10710 - 10726 O 05/17/02 2" 4 11840 - 11890 O 05/17/02 2" 4 11915 - 11940 O 05/17/02 2" 4 12010 - 12085 O 05/17/02 4-1/2" SLTD 12913- 13805 O 06/22/97 2" 4 12100 - 12250 O 09/16/99 2" 4 12310 - 12490 O 09/16/99 S-43 L1 PERFS DATE REV BY COMMENTS DATE REV BY COMMENTS 06/22/97 ORIGINAL COMPLETION 03/14/01 SIS-QAA COM/ ERTED TO CANVAS 03/16/01 SIS -CS FINAL 03/26/02 CH/KAK 100RRECTIONS NEV" MAY 3 0 2003 PRUDHOE BAY UNIT WELL: S-43 L1 PERMIT Noy --1976-580 ( A API No: 50-029-22754-60 Sec. 35, T12N, T1 2E BP Exploration (Alaska) Y Page: 1 Date: 05/24/99 T / RUN RECVD D BOX ------------- - --- FINAL 11/05/97 AOGCC Individual Well FINAL Geological Materials Inventory T FINAL 11/05/97 PERMIT DATA T DATA PLUS --------- 97-053 ---------------- CDR/ARCS-TVD - ------------------------- 8100-8900 97-053 CDR/ARC5-MD vl 8410-13990 ,7�( 97-053 CDR/ARC5-MD LV8410-13990 S� p$ FINAL 05/19/99 97-053 7855 CHLUM CDR/ARC5 97-053 SRVY RPT { SCHLUM 0-14061. 97-053 DEFT-SPIN/TEM PRES 9394-9779 97-053 PROD-SPIN/TEM PRES/DEFT 2850-9779 al�3/9g 97-053 PROD-SPIN/TEM/ RES 9650-9950 y/30/419 Page: 1 Date: 05/24/99 T / RUN RECVD D BOX ------------- - --- FINAL 11/05/97 T FINAL 11/05/97 T FINAL 11/05/97 T 109 11/05/97 11/03/97 FINAL 02/26/98 FINAL 02/26/98 p$ FINAL 05/19/99 10-407 LR- COMPLETION DATE @612,,21q71 DAILY WELL OPS R B /97 / TO / 7/ B Are dry ditch samples required? yes And received? Was the well cored? yes alysis & description received?._ Are well tests required) es�ceived? Well is in compliance Initial COMMENTS Schlumberger Ge - .- GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie Well Job # Log Description NO. 11857 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Date BL RF Sepia LIS Tape 2/25/98 gt H-1 3 PERFORATING RECORD 980220 1 1 R-11 LEAK DETECTION 980220 1 1 R-11 INJECTION PROFILE 980221 1 1 R-11 GAMMA RAY/COLLAR/JEWELRY 980221 1 1 S-43 MULTI -LATERAL FULL SUITE PRODUCTION LOG 980213 1 1 S-43 MULTI -LATERAL DEFT LOG 980213 1 1 U-03 INJECTION PROFILE 980216 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received cs_� 12/3/97 Schlumberger GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie Well Job # Log Description NO. 11605 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Date BL RF Sepia Tape S -22B REDO 97473 GR &ARC5 970708 1 *REDO -INCORRECT MNEMONICS S-43 REDO 97471 CDR & ARC5 970530 1 *REDO -SPLICE RESISTIVITY S-43 L1 REDO 97472 CDR & ARC5 970617 1 *REDO -MERGE RESISTIVITY IN EDIT FILE PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: ' 5 JX -1-e) ' 3 L- Rc-0 /c? -7 --L)- k43 BP Exploration (Alaska) Inc. Schlumberger GeoQuest Petrotectnical Data Center M133-3 500 W. International Airport Road 900 E. Benson Blvd. Anchorage, Alaska 99618-1199 Anchorage, Alaska 99519-6612. Date Delivered: 1�'� f Received �i"t•os3 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie Well Job # Log Description NO. 11515 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Date BL RF Sepia Tape 10/31/97 S-43 L1 97472 CDR ARC 5 970617 1 S-43 L1 97472 CDR ARC 5 2" 970617 1 1 S-43 L1 97472 CDR ARC 5 5" 970617 1 1 S-43 L1 97472 CDR ARC 5 TVD 970617 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center M133-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: gm-`% FC, E IND NOV 5 199( i�jaskdOas d..�l'r61�a. t.�titil(i"ti; l�J96 Ajii;�'l Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well N Oil ❑ Gas ❑ Suspended ❑ Abandoned ❑ Service 2. Name of Operator BP Exploration (Alaska) Inc. 7. Permit Number 97-53 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 8. API Number 50-029-22754-60 4. Location of well at surface - 4211' NSL, 4503' WEL, SEC. 35, T12N, R12E, UPM : At top of productive interval / 4442 NSL, 1485 WEL, SEC. 35, T12N, R12E, UPM = ,. ,-; At total depth _ r 2947' NSL, 344' WEL, SEC. 26, T12N, R12E, UPM 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number S-431-1 11. Field and Pool Prudhoe Bay Field /Prudhoe Bay Pool 5. Elevation in feet (indicate KB, DF, etc.) KBE = 68.1' 6. Lease Designation and Serial No. ADL 028257 12. Date Spudded 5/3/97 13. Date T.D. Reached 6/16/97 14. Date Comp., Susp., or Aband. 6/22/97 15. Water depth, if offshore N/A MSL 16. No. of Completions One 17. Total Depth (MD+TVD) 14061 8845 FT 18. Plug Back Depth (MD+TVD) 14061 8845 FT 19. Directional Survey 20. NYes ❑No I Depth where SSSV set (Nipple) 2209' MD 21. Thickness of Permafrost 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD/FE, GR, RES 23• CASING LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 30' 3121' 12-1/4" 1700 sx CSIII, 505 sx 'G' 7" 26# L-80 27' 9749' 8-1/2" 580 sx Class 'G' 4-1/2" 12.6# NT -80 9784' 13945' 6" Uncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner MD TVD MD TVD 9807'- 13912' 8889'-8842' 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2", 12.6#, L-80 9089' 9032' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 75 Bbls of Diesel 27. PRODUCTION TEST Date First Production July 4, 1997 Method of Operation (Flowing, gas lift, etc.) Flowing Date of Test Hours Tested PRODUCTION FOR OIL -BBL TEST PERIOD GAS -MCF WATER -BBL CHOKE SIZE GAS -OIL RATIO Flow Tubing Casing Pressure CALCULATED OIL -BBL Press. 24-HOUR RATE GAS -MCF WATER -BBL OIL GRAVITY -API (CORR) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ORIGINAL Form 10-407 Rev. 07-01-80 ' Submit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured True Vertical Include interval tested, pressure data, all fluids Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9751' 8864' 31. List of Attachments Summary of Daily Drilling Reports, Surveys, Annular Pumping Report 32. 1 hereby certify that t for oing is t an rrect to the best of my knowledge Signed _.. Dan Stoltz Title Senior Drilling Engineer Date S 97-53 Prepared By Name/Number: Terrie Hubble, 564-4628 Numb Welll Number Permit No. /Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, Other -explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ANNULAR INJECTION DATA ENTRY SCREEN Asset WQA.......................................... Legal Desc 421.1:N 1,�4;?R :INET.S. �T.12N,Fi..2..................................... Research RigName Nab.QCs.1$E.............................................................................................................................................................................................................................................................. Inj Well Name $-..43 ............................................ Permit Start .........:.7.:7.......... Permit End .........5-.7-.95 ......... .......................................................................................................... SurCsg De ............................... ............................... ............................... ............................... Cumulative Data Daily Data S-43 05/22/97 280 280 3 850 S-43 ___..............____...—__.._._......_......_.-...._... 5-43 05/23/97 05/25/97 384 111 123 384 234 3 3 600-900 850 _.......... ............. _....... _........ __...__._ __._____...._....___..__....._...._.._......_.—.._._.._._...__. S-43 05/27/97 203 204 407 3 850-900 S-43 S_....-4._..._...3 --- -._._..----------- 05/28/97 .05/30/97 ....------ — 151 ------..__.._..__...._._.._._......_....._..__.. 60 120 126 _..... _ __........_.._....._ ........._ .__.._..............__......._......._......_............_._............ � _ .._...._................... 271 186 ...... _. ........................... 3 3 900 900 .. ........................__.._................................._._.... .............. S-43 06/01/97 303 375 678 2.5 900 S-43-�� 06/03/97 75 75 2 900 S-43 06/04/97 150 150 2 900 S-43 06/05/97 70 70 3 900 8-43._..__......__.__ 06/06/97 .�'. .107 107 .....______.._ 3 800 S-43 06/08/97 75 43 118 3 800 S-43 06/09/97 226 226 3 900 06/10/97 201 201 3 900 S-431-1 06/12/97 25 25 50 3 900 S-431-1 06/14/97 32 68 100 2.5 800 S -43L1 06/16/97 70 70 3 800 S -43L1 06/17/97 140 40 180 2.5 800 5-431-1 � 06/18/97 375 500 875 2.5 725 S -43L1 06/19/97 75 75 3 800 S -43L1 06/22/97 115 1,011 1,126 3 875 9-431-1 - 06/23/97 80 80 "- 2.6 1250 OPEN I Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Date/Time Duration Activity 02 May 97 17:00-18:00 1 hr Rigged down Drillfloor / Derrick 18:00-18:30 1/2 hr Held safety meeting 18:30-19:30 1 hr Rig moved 50.00 % 19:30-03:00 7-1/2 hr Rig moved 100.00 % 03 May 97 03:00-06:00 3 hr Rigged up Fluid system 06:00-10:00 4 hr Rigged up Divertor 10:00-12:30 2-1/2 hr Fill pits with Water based mud 12:30-13:00 1/2 hr Held safety meeting 13:00-14:30 1-1/2 hr Made up BHA no. 1 14:30-02:00 11-1/2 hr Drilled to 1145.00 ft 04 May 97 02:00-02:30 1/2 hr Pulled out of hole to 207.00 ft 02:30-03:00 1/2 hr R.I.H. to 1145.00 ft 03:00-06:00 3 hr Drilled to 1450.00 ft 06:00-09:30 3-1/2 hr Drilled to 1640.00 ft (cont...) 09:30-10:30 1 hr Repaired Drilling tool / logs 10:30-16:00 5-1/2 hr Drilled to 2266.00 ft 16:00-16:30 1/2 hr Pulled out of hole to 1050.00 ft 16:30-17:00 1/2 hr R.I.H. to 2226.00 ft 17:00-22:30 5-1/2 hr Drilled to 3135.00 ft 22:30-00:00 1-1/2 hr Circulated at 3135.00 ft 05 May 97 00:00-01:00 1 hr Pulled out of hole to 665.00 ft 01:00-02:00 1 hr R.I.H. to 3135.00 ft 02:00-03:30 1-1/2 hr Circulated at 3135.00 ft 03:30-04:30 1 hr Pulled out of hole to 665.00 ft 04:30-06:00 1-1/2 hr Pulled BHA 06:00-06:30 1/2 hr Pulled BHA (cont...) 06:30-07:30 1 hr Rigged up Casing handling equipment 07:30-08:00 1/2 hr Held safety meeting 08:00-12:30 4-1/2 hr Ran Casing to 3120.00 ft (9-5/8in OD) 12:30-14:30 2 hr Circulated at 3120.00 ft 14:30-15:00 1/2 hr Held safety meeting 15:00-17:00 2 hr Mixed and pumped slurry - 153.700 bbl 17:00-20:00 3 hr Circulated at 2200.00 ft 20:00-20:30 1/2 hr Held safety meeting 20:30-23:00 2-1/2 hr Mixed and pumped slurry - 530.000 bbl 23:00-02:30 3-1/2 hr Removed Divertor 06 May 97 02:30-04:30 2 hr Installed Casing head 04:30-06:00 1-1/2 hr Rigged up BOP stack 06:00-07:00 1 hr Rigged up BOP stack (cont...) 07:00-10:30 3-1/2 hr Tested BOP stack 10:30-12:00 1-1/2 hr Repaired Blind / Shear ram 12:00-12:30 1/2 hr Tested Blind ram 12:30-15:30 3 hr Made up BHA no. 2 15:30-16:00 1/2 hr R.I.H. to 2197.00 ft 16:00-18:00 2 hr Drilled cement to 2310.00 ft 18:00-18:30 1/2 hr R.I.H. to 2992.00 ft 18:30-19:00 1/2 hr Tested Casing - Via string 19:00-19:30 1/2 hr Held drill (Kick (well kill)) 19:30-20:30 1 hr Drilled cement to 3155.00 ft 20:30-21:00 1/2 hr Circulated at 3155.00 ft 21:00-21:30 1/2 hr Performed formation integrity test 21:30-01:30 4 hr Drilled to 3573.00 ft 07 May 97 01:30-02:30 1 hr Circulated at 3573.00 ft 02:30-06:00 3-1/2 hr Drilled to 3940.00 ft Page 1 Date 27 August 97 Ir Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Date/Time Duration Activity 06:00-08:30 2-1/2 hr Drilled to 4162.00 ft (cont...) 08:30-09:00 1/2 hr Pulled out of hole to 3120.00 ft 09:00-09:30 1/2 hr R.I.H. to 4162.00 ft 09:30-21:30 12 hr Drilled to 5210.00 ft 21:30-22:00 1/2 hr Held safety meeting 22:00-01:30 3-1/2 hr Drilled to 5409.00 ft 08 May 97 01:30-02:00 1/2 hr Circulated at 5409.00 ft 02:00-03:30 1-1/2 hr Pulled out of hole to 657.00 ft 03:30-04:30 1 hr Pulled BHA 04:30-06:00 1-1/2 hr Made up BHA no. 3 06:00-08:30 2-1/2 hr R.I.H. to 5409.00 ft 08:30-19:30 11 hr Drilled to 6440.00 ft 19:30-20:00 1/2 hr Pulled out of hole to 5350.00 ft 20:00-20:30 1/2 hr R.I.H. to 6440.00 ft 20:30-06:00 9-1/2 hr Drilled to 7150.00 ft 09 May 97 06:00-10:00 4 hr Drilled to 7406.00 ft (cont...) 10:00-10:30 1/2 hr Pulled out of hole to 6350.00 ft 10:30-11:00 1/2 hr R.I.H. to 7406.00 ft 11:00-03:30 16-1/2 hr Drilled to 8470.00 ft 10 May 97 03:30-04:30 1 hr Circulated at 8470.00 ft 04:30-06:00 1-1/2 hr Pulled out of hole to 4500.00 ft 06:00-07:30 1-1/2 hr Pulled out of hole to 218.00 ft (cont...) 07:30-08:30 1 hr Pulled BHA 08:30-10:00 1-1/2 hr Made up BHA no. 4 10:00-13:00 3 hr R.I.H. to 8740.00 ft 13:00-06:00 17 hr Drilled to 8864.00 ft 11 May 97 06:00-06:00 24 hr Drilled to 9461.00 ft (cont...) 12 May 97 06:00-06:30 1/2 hr Circulated at 9461.00 ft 06:30-09:00 2-1/2 hr Pulled out of hole to 218.00 ft 09:00-09:30 1/2 hr Pulled BHA 09:30-10:00 1/2 hr Installed Wear bushing 10:00-11:00 1 hr Made up BHA no. 5 11:00-11:30 1/2 hr R.I.H. to 3120.00 ft 11:30-12:00 1/2 hr Serviced Block line 12:00-16:30 4-1/2 hr R.I.H. to 9461.00 ft 16:30-06:00 13-1/2 hr Drilled to 9867.00 ft 13 May 97 06:00-13:30 7-1/2 hr Drilled to 10001.00 ft (cont...) 13:30-15:30 2 hr Circulated at 10001.00 ft 15:30-19:00 3-1/2 hr Circulated at 10001.00 ft 19:00-06:00 11 hr Drilled to 10153.00 ft 14 May 97 06:00-08:00 2 hr Drilled to 10205.00 ft 08:00-10:30 2-1/2 hr Circulated at 10205.00 ft 10:30-12:30 2 hr Pulled out of hole to 3100.00 ft 12:30-14:30 2 hr R.I.H. to 10205.00 ft 14:30-18:00 3-1/2 hr Circulated at 10205.00 ft 18:00-00:30 6-1/2 hr Laid down 9600.00 ft of 5in OD drill pipe 15 May 97 00:30-02:30 2 hr Pulled BHA 02:30-04:00 1-1/2 hr Rigged up Top ram 04:00-04:30 1/2 hr Rigged up Casing handling equipment 04:30-06:00 1-1/2 hr Ran Casing to lin (1000.00 ft OD) 06:00-14:30 8-1/2 hr Ran Casing to 9632.00 ft (lin OD) (cont...) 14:30-21:30 7 hr Laid down 328.00 ft of Casing 21:30-00:00 2-1/2 hr Circulated at 9300.00 ft 16 May 97 00:00-02:00 2 hr Laid down 820.00 ft of Casing Page 2 Date 27 August 97 Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Date/Time Duration Activity 02:00-03:30 1-1/2 hr Circulated at 8480.00 ft 03:30-06:00 2-1/2 hr Laid down Casing of 1190.00 ft 06:00-16:00 10 hr Laid down 8480.00 ft of Casing (cont...) 16:00-16:30 1/2 hr Removed Casing handling equipment 16:30-19:00 2-1/2 hr Rigged up Top ram 19:00-22:30 3-1/2 hr Tested BOP stack 22:30-23:00 1/2 hr Installed Bore protector 23:00-03:00 4 hr Made up BHA no. 6 17 May 97 03:00-04:00 1 hr Made up BHA no. 6 04:00-06:00 2 hr Singled in drill pipe to 2000.00 ft 06:00-12:00 6 hr Singled in drill pipe to 2000.00 ft (cont...) 12:00-12:30 1/2 hr Reamed to 9330.00 ft 12:30-14:00 1-1/2 hr Worked stuck pipe at 9325.00 ft 14:00-15:30 1-1/2 hr Circulated at 9240.00 ft 15:30-02:30 11 hr Reamed to 9504.00 ft 18 May 97 02:30-05:00 2-1/2 hr Circulated at 9240.00 ft 05:00-06:00 1 hr Washed to 9340.00 ft 06:00-20:30 14-1/2 hr Washed to 9340.00 ft (cont...) 20:30-21:30 1 hr Pulled out of hole to 9125.00 ft 21:30-22:00 1/2 hr R.I.H. to 9428.00 ft 22:00-02:00 4 hr Reamed to 9625.00 ft 19 May 97 02:00-05:00 3 hr Reamed to 9632.00 ft 05:00-06:00 1 hr Reamed to 9645.00 ft 06:00-08:00 2 hr Reamed to 9645.00 ft (cont...) 08:00-10:00 2 hr Circulated at 9664.00 ft 10:00-12:30 2-1/2 hr Pulled out of hole to 500.00 ft 12:30-13:00 1/2 hr Pulled BHA 13:00-14:30 1-1/2 hr Rigged up Kelly 14:30-15:30 1 hr Tested BOP stack 15:30-16:00 1/2 hr Tested Kelly 16:00-17:00 1 hr Made up BHA no. 7 17:00-00:00 7 hr Singled in drill pipe to 9420.00 ft 20 May 97 00:00-06:00 6 hr Reamed to 9717.00 ft 06:00-13:00 7 hr Reamed to 10205.00 ft 13:00-14:00 1 hr Circulated at 10205.00 ft 14:00-14:30 1/2 hr Pulled out of hole to 8955.00 ft 14:30-15:00 1/2 hr R.I.H. to 9740.00 ft 15:00-18:30 3-1/2 hr Reamed to 9835.00 ft 18:30-19:00 1/2 hr R.I.H. to 10205.00 ft 19:00-20:30 1-1/2 hr Circulated at 10205.00 ft 20:30-23:30 3 hr Pulled out of hole to 600.00 ft 23:30-00:00 1/2 hr Pulled BHA 21 May 97 00:00-01:00 1 hr Rigged up Top ram 01:00-02:00 1 hr Rigged up Casing handling equipment 02:00-06:00 4 hr Ran Casing to lin (3100.00 ft OD) 06:00-12:00 6 hr Ran Casing to 3100.00 ft (lin OD) (cont...) 12:00-15:30 3-1/2 hr Circulated at 9250.00 ft 15:30-17:30 2 hr Ran Casing to 10196.00 ft (lin OD) 17:30-19:30 2 hr Circulated at 10196.00 ft 19:30-20:30 1 hr Circulated at 10196.00 ft 20:30-21:00 1/2 hr Held safety meeting 21:00-23:00 2 hr Rig waited: Equipment 23:00-00:00 1 hr Mixed and pumped slurry - 242.000 bbl 22 May 97 00:00-01:00 1 hr Displaced slurry - 387.000 bbl Page 3 Date 27 August 97 Ir Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Page 4 Date 27 August 97 Date/Time Duration Activity 01:00-02:00 1 hr Cleared Cement head 02:00-04:00 2 hr Installed Seal assembly 04:00-05:00 1 hr Rigged up Top ram 05:00-06:00 1 hr Serviced Annular preventor 06:00-09:30 3-1/2 hr Serviced Annular preventor (cont...) 09:30-12:30 3 hr Tested BOP stack 12:30-14:30 2 hr Rigged up Kelly 14:30-15:00 1/2 hr Serviced Block line 15:00-16:30 1-1/2 hr Rig waited: Equipment 16:30-19:00 2-1/2 hr Made up BHA no. 8 19:00-22:30 3-1/2 hr R.I.H. to 9600.00 ft 22:30-23:30 1 hr Circulated at 9600.00 ft 23:30-00:00 1/2 hr Held drill (Kick (well kill)) 23 May 97 00:00-06:00 6 hr Laid down 3100.00 ft of 5in OD drill pipe 06:00-12:30 6-1/2 hr Laid down 9400.00 ft of 5in OD drill pipe (cont...) 12:30-13:00 1/2 hr Removed Drillstring handling equipment 13:00-14:00 1 hr Rigged up Drillstring handling equipment 14:00-15:30 1-1/2 hr Singled in drill pipe to 9970.00 ft 15:30-16:30 1 hr Drilled cement to 10103.00 ft 16:30-17:00 1/2 hr Circulated at 10103.00 ft 17:00-18:00 1 hr Tested Casing - Via annulus and string 18:00-19:00 1 hr Drilled cement to 10205.00 ft 19:00-19:30 1/2 hr Took MWD survey at 10190.00 ft 19:30-20:00 1/2 hr Drilled to 10225.00 ft 20:00-21:00 1 hr Circulated at 10225.00 ft 21:00-22:30 1-1/2 hr Circulated at 10200.00 ft 22:30-23:00 1/2 hr Took MWD survey at 10225.00 ft 23:00-00:00 1 hr Drilled to 10263.00 ft 24 May 97 00:00-00:30 1/2 hr Took MWD survey at 10263.00 ft 00:30-01:30 1 hr Drilled to 10294.00 ft 01:30-02:00 1/2 hr Took MWD survey at 10260.00 ft 02:00-05:00 3 hr Drilled to 10358.00 ft 05:00-06:00 1 hr Took MWD survey at 10358.00 ft 06:00-06:30 1/2 hr Took MWD survey at 10358.00 ft (cont...) 06:30-10:00 3-1/2 hr Pulled out of hole to 260.00 ft 10:00-11:00 1 hr Downloaded MWD tool 11:00-12:30 1-1/2 hr Made up BHA no. 9 12:30-15:30 3 hr R.I.H. to 10358.00 ft 15:30-06:00 14-1/2 hr Drilled to 10723.00 ft 25 May 97 06:00-22:00 16 hr Drilled to 11658.00 ft (cont...) 22:00-23:30 1-1/2 hr Circulated at 11568.00 ft 23:30-01:00 1-1/2 hr Pulled out of hole to 9840.00 ft 26 May 97 01:00-01:30 1/2 hr Logged hole with LWD: Formation evaluation (FE) from 9840.00 ft to 9596.00 ft 01:30-04:30 3 hr Pulled out of hole to 260.00 ft 04:30-05:30 1 hr Downloaded MWD tool 05:30-06:00 1/2 hr Made up BHA no. 10 06:00-08:00 2 hr Made up BHA no. 10 (cont...) 08:00-12:30 4-1/2 hr R.I.H. to 11568.00 ft 12:30-13:30 1 hr Worked toolstring at 10568.00 ft 13:30-16:30 3 hr Pulled out of hole to 260.00 ft 16:30-19:00 2-1/2 hr Pulled BHA 19:00-21:30 2-1/2 hr Made up BHA no. 11 21:30-01:30 4 hr R.I.H. to 11578.00 ft Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Page 5 Date 27 August 97 Date/Time Duration Activity 27 May 97 01:30-06:00 4-1/2 hr Drilled to 11809.00 ft 06:00-10:30 4-1/2 hr Drilled to 11949.00 ft (cont...) 10:30-11:00 1/2 hr Repaired High pressure lines 11:00-12:30 1-1/2 hr Drilled to 12012.00 ft 12:30-13:00 1/2 hr Worked toolstring at 12012.00 ft 13:00-16:30 3-1/2 hr Pulled out of hole to 260.00 ft 16:30-17:00 1/2 hr Pulled BHA 17:00-19:00 2 hr Made up BHA no. 12 19:00-23:00 4 hr R.I.H. to 12012.00 ft 23:00-06:00 7 hr Drilled to 12416.00 ft 28 May 97 06:00-03:00 21 hr Drilled to 13188.00 ft (cont...) 29 May 97 03:00-04:30 1-1/2 hr Circulated at 13188.00 ft 04:30-06:00 1-1/2 hr Pulled out of hole to 7000.00 ft 06:00-08:30 2-1/2 hr Pulled out of hole to 261.00 ft (cont...) 08:30-10:00 1-1/2 hr Pulled BHA 10:00-10:30 1/2 hr Retrieved Wear bushing 10:30-13:30 3 hr Tested BOP stack 13:30-14:00 1/2 hr Installed Wear bushing 14:00-16:00 2 hr Made up BHA no. 13 16:00-17:30 1-1/2 hr R.I.H. to 4000.00 ft 17:30-18:00 1/2 hr Serviced Block line 18:00-21:30 3-1/2 hr R.I.H. to 13188.00 ft 21:30-06:00 8-1/2 hr Drilled to 13544.00 ft 30 May 97 06:00-13:30 7-1/2 hr Drilled to 13888.00 ft (cont...) 13:30-15:00 1-1/2 hr Circulated at 13888.00 ft 15:00-16:30 1-1/2 hr Pulled out of hole to 9552.00 ft 16:30-19:00 2-1/2 hr Logged hole with LWD: Formation evaluation (FE) from 9552.00 ft to 10250.00 ft 19:00-20:00 1 hr R.I.H. to 13888.00 ft 20:00-22:00 2 hr Circulated at 13888.00 ft 22:00-06:00 8 hr Pulled out of hole to 261.00 ft 31 May 97 06:00-07:30 1-1/2 hr Pulled BHA 07:30-08:30 1 hr Rigged up Casing handling equipment 08:30-09:00 1/2 hr Held safety meeting 09:00-15:00 6 hr Ran Casing to 3748.00 ft (4-1/2in OD) 15:00-22:30 7-1/2 hr Ran Drillpipe in stands to 10196.00 ft 22:30-00:00 1-1/2 hr Circulated at 10196.00 ft 01 Jun 97 00:00-05:00 5 hr Ran Drillpipe in stands to 13807.00 ft 05:00-06:00 1 hr Circulated at 13807.00 ft 06:00-07:00 1 hr Circulated at 13807.00 ft (cont...) 07:00-09:00 2 hr Circulated at 13807.00 ft 09:00-09:30 1/2 hr Held safety meeting 09:30-10:30 1 hr Batch mixed slurry - 67.000 bbl 10:30-12:00 1-1/2 hr Displaced slurry - 67.000 bbl 12:00-12:30 1/2 hr Functioned Permanent packer 12:30-13:00 1/2 hr Reverse circulated at 10059.00 ft 13:00-14:00 1 hr Pumped out of hole to 8670.00 ft 14:00-15:30 1-1/2 hr Circulated at 8670.00 ft 15:30-18:30 3 hr Pumped out of hole to 0.00 ft 18:30-19:30 1 hr Ran Drillpipe in stands to 3441.00 ft 19:30-22:00 2-1/2 hr Laid down 3441.00 ft of 3-1/2in OD drill pipe 22:00-04:00 6 hr Made up BHA no. 14 02 Jun 97 04:00-06:00 2 hr R.I.H. to 8670.00 ft 06:00-06:30 1/2 hr R.I.H. to 10059.00 ft (cont...) r, Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Page 6 Date 27 August 97 Date/Time Duration Activity 06:30-07:00 1/2 hr Circulated at 10059.00 ft 07:00-07:30 1/2 hr Held drill (Kick (well kill)) 07:30-08:00 1/2 hr Tested Casing - Via annulus 08:00-08:30 1/2 hr R.I.H. to 10094.00 ft 08:30-09:00 1/2 hr Drilled cement to 10097.00 ft 09:00-10:00 1 hr R.I.H. to 12567.00 ft 10:00-10:30 1/2 hr Laid down 270.00 ft of 3-1/2in OD drill pipe 10:30-15:00 4-1/2 hr Drilled cement to 12872.00 ft 15:00-21:00 6 hr Drilled installed equipment - DV collar 21:00-05:00 8 hr Drilled installed equipment - Landing collar 03 Jun 97 05:00-06:00 1 hr Circulated at 12940.00 ft 06:00-07:00 1 hr R.I.H. to 13814.00 ft 07:00-08:30 1-1/2 hr Circulated at 13800.00 ft 08:30-09:30 1 hr Laid down 744.00 ft of 3-1/2in OD drill pipe 09:30-13:00 3-1/2 hr Pulled out of hole to 3971.00 ft 13:00-18:00 5 hr Laid down 3791.00 ft of 2-7/8in OD drill pipe 18:00-18:30 1/2 hr Held safety meeting 18:30-20:30 2 hr Rigged up Logging braided cable equipment 20:30-23:00 2-1/2 hr Conducted electric cable operations 23:00-00:00 1 hr Rigged down Wireline units 04 Jun 97 00:00-05:30 5-1/2 hr Made up BHA no. 1 05:30-06:00 1/2 hr Pulled BHA 06:00-07:00 1 hr Downloaded MWD tool 07:00-11:00 4 hr R.I.H. to 9628.00 ft 11:00-12:30 1-1/2 hr Logged hole with LWD: Formation evaluation (FE) from 9540.00 ft to 9583.00 ft 12:30-13:00 1/2 hr R.I.H. to 9774.00 ft 13:00-14:30 1-1/2 hr Serviced Other sub -surface equipment 14:30-17:00 2-1/2 hr Worked toolstring at 9750.00 ft 17:00-17:30 1/2 hr Tested Downhole equipment - Via annulus and string 17:30-04:00 10-1/2 hr Milled Casing at 9778.00 ft 05 Jun 97 04:00-05:30 1-1/2 hr Circulated at 9778.00 ft 05:30-06:00 1/2 hr Pulled out of hole to 9000.00 ft 06:00-08:30 2-1/2 hr Pulled out of hole to 262.00 ft (cont...) 08:30-10:00 1-1/2 hr Pulled BHA 10:00-11:00 1 hr Retrieved Wear bushing 11:00-14:00 3 hr Tested BOP stack 14:00-14:30 1/2 hr Installed Wear bushing 14:30-16:00 1-1/2 hr Made up BHA no. 16 16:00-19:30 3-1/2 hr R.I.H. to 9778.00 ft 19:30-03:30 8 hr Drilled to 9873.00 ft 06 Jun 97 03:30-04:30 1 hr Circulated at 9873.00 ft 04:30-06:00 1-1/2 hr Pulled out of hole to 7000.00 ft 06:00-08:30 2-1/2 hr Pulled out of hole to 239.00 ft (cont...) 08:30-09:00 1/2 hr Pulled BHA 09:00-10:00 1 hr Made up BHA no. 17 10:00-10:30 1/2 hr R.I.H. to 2000.00 ft 10:30-11:00 1/2 hr Serviced Block line 11:00-13:30 2-1/2 hr R.I.H. to 9711.00 ft 13:30-14:00 1/2 hr Logged hole with LWD: Formation evaluation (FE) from 9774.00 ft to 9811.00 ft 14:00-06:00 16 hr Drilled to 10016.00 ft 07 Jun 97 06:00-07:00 1 hr Drilled to 10042.00 ft (cont...) 07:00-07:30 1/2 hr Investigated pressure change rA Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Page 7 Date 27 August 97 Date/Time Duration Activity 07:30-12:30 5 hr Pulled out of hole to 192.00 ft 12:30-12:45 1/4 hr Removed Wear bushing 12:45-13:00 1/4 hr Installed Wear bushing 13:00-13:30 1/2 hr Held safety meeting 13:30-14:30 1 hr Rig waited: Downhole fish 14:30-15:00 1/2 hr Made up BHA no. 18 15:00-18:30 3-1/2 hr R.I.H. to 9849.00 ft 18:30-19:00 1/2 hr Fished at 9849.00 ft 19:00-23:00 4 hr Pulled out of hole to 15.00 ft 23:00-00:00 1 hr Laid down fish 08 Jun 97 00:00-01:00 1 hr Made up BHA no. 19 01:00-04:00 3 hr R.I.H. to 9857.00 ft 04:00-04:30 1/2 hr Fished at 9857.00 ft 04:30-06:00 1-1/2 hr Pulled out of hole to 7000.00 ft 06:00-09:30 3-1/2 hr Pulled out of hole to 15.00 ft (cont...) 09:30-10:30 1 hr Laid down fish 10:30-13:30 3 hr Made up BHA no. 20 13:30-17:00 3-1/2 hr R.I.H. to 10042.00 ft 17:00-03:00 10 hr Drilled to 10414.00 ft 09 Jun 97 03:00-04:00 1 hr Circulated at 10414.00 ft 04:00-06:00 2 hr Pulled out of hole to 7000.00 ft 06:00-07:30 1-1/2 hr Pulled out of hole to 255.00 ft (cont...) 07:30-08:00 1/2 hr Pulled BHA 08:00-08:30 1/2 hr Made up BHA no. 21 08:30-12:00 3-1/2 hr R.I.H. to 10340.00 ft 12:00-12:30 1/2 hr Logged hole with LWD: Formation evaluation (FE) from 10340.00 ft to 10414.00 ft 12:30-13:30 1 hr Drilled to 10426.00 ft 13:30-14:30 1 hr Functioned Drilling tool / logs 14:30-22:00 7-1/2 hr Drilled to 10765.00 ft 22:00-23:00 1 hr Circulated at 10765.00 ft 23:00-02:30 3-1/2 hr Pulled out of hole to 223.00 ft 10 Jun 97 02:30-04:00 1-1/2 hr Pulled BHA 04:00-04:30 1/2 hr Made up BHA no. 22 04:30-06:00 1-1/2 hr R.I.H. to 5000.00 ft 06:00-07:00 1 hr R.I.H. to 10765.00 ft (cont...) 07:00-06:00 23 hr Drilled to 11750.00 ft 11 Jun 97 06:00-16:00 10 hr Drilled to 12069.00 ft (cont...) 16:00-17:30 1-1 /2 hr Circulated at 12069.00 ft 17:30-21:30 4 hr Pulled out of hole to 100.00 ft 21:30-22:00 1/2 hr Pulled BHA 22:00-23:00 1 hr Rigged up High pressure lines 23:00-02:00 3 hr Tested BOP stack 12 Jun 97 02:00-02:30 1/2 hr Made up BHA no. 23 02:30-04:00 1-1/2 hr R.I.H. to 6000.00 ft 04:00-05:00 1 hr Serviced Block line 05:00-06:00 1 hr R.I.H. to 8000.00 ft 06:00-07:30 1-1/2 hr R.I.H. to 12069.00 ft (cont...) 07:30-01:00 17-1/2 hr Drilled to 12452.00 ft 13 Jun 97 01:00-01:30 1/2 hr Took MWD survey at 12452.00 ft 01:30-06:00 4-1/2 hr Drilled to 12524.00 ft 06:00-07:30 1-1/2 hr Drilled to 12705.00 ft (cont...) 07:30-09:00 1-1 /2 hr Circulated at 12705.00 ft 09:00-01:30 16-1/2 hr Pulled out of hole to 12705.00 ft Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Page 8 Date 27 August 97 Date/Time Duration Activity 14 Jun 97 01:30-02:30 1 hr Pulled BHA 02:30-04:00 1-1/2 hr Made up BHA no. 24 04:00-06:00 2 hr R.I.H. to 6000.00 ft 06:00-08:00 2 hr R.I.H. to 12705.00 ft (cont...) 08:00-19:30 11-1/2 hr Drilled to 12888.00 ft 19:30-00:30 5 hr Pulled out of hole to 100.00 ft 15 Jun 97 00:30-01:00 1/2 hr Pulled BHA 01:00-02:00 1 hr Made up BHA no. 24 02:00-05:00 3 hr R.I.H. to 12888.00 ft 05:00-06:00 1 hr Took MWD survey at 12713.00 ft 06:00-08:00 2 hr Took MWD survey at 12713.00 ft (cont...) 08:00-06:00 22 hr Drilled to 13640.00 ft 16 Jun 97 06:00-17:00 11 hr Drilled to 14014.00 ft (cont...) 17:00-18:00 1 hr Circulated at 14014.00 ft 18:00-20:00 2 hr Drilled to 14061.00 ft 20:00-21:30 1-1/2 hr Circulated at 14061.00 ft 21:30-00:30 3 hr Pulled out of hole to 9740.00 ft 17 Jun 97 00:30-02:30 2 hr R.I.H. to 14000.00 ft 02:30-04:30 2 hr Circulated at 14000.00 ft 04:30-06:00 1-1/2 hr Pulled out of hole to 13300.00 ft 06:00-13:00 7 hr Pulled out of hole to 100.00 ft (cont...) 13:00-14:00 1 hr Pulled BHA 14:00-14:30 1/2 hr Removed Bore protector 14:30-18:00 3-1/2 hr Ran Liner to 4161.00 ft (4-1/2in OD) 18:00-22:30 4-1/2 hr Ran Tubing to 4121.00 ft (2-1/16in OD) 22:30-01:30 3 hr Ran Drillpipe in stands to 9750.00 ft 18 Jun 97 01:30-02:00 1/2 hr Circulated at 9750.00 ft 02:00-03:30 1-1/2 hr Ran Liner to 13945.00 ft (4-1/2in OD) 03:30-06:00 2-1/2 hr Circulated at 13945.00 ft 06:00-07:00 1 hr Circulated at 13945.00 ft (cont...) 07:00-08:30 1-1/2 hr Pulled Drillpipe in stands to 9755.00 ft 08:30-13:00 4-1/2 hr Circulated at 9755.00 ft 13:00-15:00 2 hr Pulled Drillpipe in stands to 4161.00 ft 15:00-06:00 15 hr Laid down 4120.00 ft of Tubing 19 Jun 97 01:30-03:30 2 hr R.I.H. to 9670.00 ft 03:30-05:30 2 hr Logged hole with LWD: Formation evaluation (FE) from 9552.00 ft to 9585.00 ft 05:30-06:00 1/2 hr Took MWD survey at 9731.00 ft 06:00-09:30 3-1/2 hr Took MWD survey at 9731.00 ft (cont...) 09:30-12:00 2-1/2 hr Fished at 9753.00 ft 12:00-13:00 1 hr Fished at 9753.00 ft 13:00-14:30 1-1/2 hr Fished at 9753.00 ft 14:30-18:00 3-1/2 hr Pulled out of hole to 954.00 ft 18:00-18:30 1/2 hr Pulled BHA 18:30-22:00 3-1/2 hr Tested BOP stack 22:00-23:00 1 hr Made up BHA no. 27 23:00-02:00 3 hr R.I.H. to 9749.00 ft 20 Jun 97 02:00-03:30 1-1/2 hr Circulated at 9761.00 ft 03:30-06:00 2-1/2 hr Pulled out of hole to 0.00 ft 06:00-11:00 5 hr R.I.H. to 9730.00 ft 11:00-13:00 2 hr Fished at 9753.00 ft 13:00-16:00 3 hr Pulled out of hole to 900.00 ft 16:00-18:00 2 hr Pulled BHA 18:00-19:30 1-1/2 hr Made up BHA no. 28 Facility PB S Pad Progress Report Well S-43 Rig Nabors 18E Page 9 Date 27 August 97 Date/Time Duration Activity 19:30-22:00 2-1/2 hr R.I.H. to 9808.00 ft 22:00-00:00 2 hr Circulated at 9808.00 ft 21 Jun 97 00:00-06:00 6 hr Laid down 6500.00 ft of 3-1/2in OD drill pipe 06:00-07:00 1 hr Laid down 9700.00 ft of 3-1/2in OD drill pipe (cont...) 07:00-08:00 1 hr Tested Top ram 08:00-09:30 1-1/2 hr Rigged up Tubing handling equipment 09:30-18:00 8-1/2 hr Ran Tubing to 6800.00 ft (4-1/2in OD) 18:00-19:00 1 hr Installed SCSSSV control line 19:00-20:30 1-1/2 hr Ran Tubing to 9088.00 ft (4-1/2in OD) 20:30-22:30 2 hr Installed Tubing hanger 22:30-00:30 2 hr Reverse circulated at 9088.00 ft 22 Jun 97 00:30-02:30 2 hr Set packer at 9089.00 ft with 2800.0 psi 02:30-04:30 2 hr Removed BOP stack 04:30-06:00 1-1/2 hr Installed Xmas tree 06:00-07:00 1 hr Installed Xmas tree (cont...) 07:00-08:00 1 hr Removed Hanger plug 08:00-13:00 5 hr Freeze protect well - 75.000 bbl of Diesel Alaska Client : BP Exploration Field : Prudhoe Bay Well name: S 43-L1 Permanent datum : MSL Depth measured from: KB, 68.1 FT Elevation of kelly bushing : 68.1 FT Elevation of rig floor : 66.6 FT Elevation of ground level : 37.2 FT Magnetic declination : 28.3 DEG Grid convergence : 0 DEG Total correction : 28.3 DEG TIE IN POINT MWD Measured depth : 0 FT True vertical depth : 0 FT NIS disp (-ve for S) 0 FT ENV disp (-ve for W) 0 FT Spud date : 05/03/97 Last survey date : 06/16/97 Inclination : 0 Azimuth : 0 Azimuth from rotary table: to the target 47.4 oS 3 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Displacement Total displ ft at Azim. de DLS (deg/ 100f Survey tool e +N/S- ft +E/W- ft 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 155.85 0.54 324.40 155.90 155.90 0.49 0.60 -0.43 0.73 324.40 0.35 MWD 3 258.85 0.75 326.00 103.00 258.89 1.28 1.55 -1.09 1.89 324.97 0.20 MWD M 4 343.33 0.76 328.10 84.40 343.28 2.05 2.48 -1.69 3.01 325.74 0.03 MWD 5 434.52 0.85 348.90 91.20 434.47 3.10 3.66 -2.14 4.24 329.67 0.33 MWD 6 525.24 0.65 9.80 90.70 525.17 4.23 4.83 -2.18 5.30 335.67 0.37 MWD 7 617.58 1.12 30.10 92.40 617.56 5.62 6.13 -1.64 6.34 345.00 0.60 MWD 8 712.34 1.28 35.00 94.70 712.24 7.48 7.79 -0.57 7.81 355.81 0.20 MWD 9 805.13 1.32 34.20 92.80 805.01 9.43 9.53 0.62 9.55 3.75 0.05 MWD 10 897.82 1.30 46.10 92.70 897.69 11.30 11.14 1.98 11.31 10.09 0.29 MWD 11 990.01 1.11 62.40 92.20 989.87 12.75 12.28 3.53 12.77 16.03 0.42 MWD 12 1083.55 0.80 103.10 93.60 1083.46 13.33 12.55 4.97 13.50 21.59 0.77 MWD 13 1175.62 1.43 123.60 92.00 1175.44 12.92 11.77 6.55 13.47 29.10 0.80 MWD 14 1269.01 1.76 137.50 93.40 1268.80 11.68 10.07 8.49 13.17 40.14 0.54 MWD 15 1364.37 2.12 138.30 95.40 1364.15 9.81 7.67 10.65 13.13 54.25 0.38 MWD 16 1457.30 2.36 139.00 92.90 1456.98 7.68 4.94 13.05 13.95 69.26 0.26 MWD 17 1550.01 2.73 123.20 92.70 1549.59 5.77 2.29 16.15 16.31 81.92 0.85 MWD 18 1644.87 4.75 107.00 94.90 1644.28 4.68 -0.09 21.80 21.80 90.25 2.38 MWD 19 1738.09 7.67 98.70 93.20 1736.93 4.81 -2.16 31.64 31.71 93.91 3.27 MWD 20 1831.66 10.61 95.70 93.60 1829.33 6.28 -3.96 46.39 46.56 94.88 3.18 MWD S 43 L1 ORIGINAL Final surveys 6/19/97 Page 1 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Displacement Total displ ft at Azim. de DLS (deg/ 100f y je +N/S- ft +E/W- ft 21 1924.97 11.53 92.90 93.30 1920.89 8.89 -5.29 64.25 64.47 94.71 1.14 MWD 22 2018.89 12.62 92.10 93.90 2012.71 12.35 -6.14 83.88 84.10 94.19 1.17 MWD 23 2113.84 14.32 92.30 94.90 2105.00 16.35 -6.99 105.96 106.19 93.77 1.79 MWD 24 2208.27 15.66 89.90 94.50 2196.28 21.25 -7.44 130.40 130.61 93.26 1.56 MWD 25 2300.15 15.52 90.90 91.90 2284.80 26.49 -7.61 155.09 155.28 92.81 0.33 MWD 26 2392.67 17.10 89.20 92.50 2373.58 32.16 -7.61 181.07 181.23 92.41 1.78 MWD 27 2486.92 18.43 90.40 94.20 2463.28 38.53 -7.52 209.81 209.94 92.05 1.46 MWD 28 2581.72 18.74 91.40 94.80 2553.14 44.67 -8.00 240.02 240.15 91.91 0.47 MWD 29 2675.45 18.83 91.30 93.80 2641.94 50.58 -8.71 270.21 270.35 91.85 0.10 MWD 30 2772.79 18.73 88.80 97.30 2734.06 57.40 -8.74 301.53 301.66 91.66 0.83 MWD 31 2865.85 17.50 87.10 93.10 2822.55 64.72 -7.72 330.46 330.55 91.34 1.44 MWD 32 2958.25 17.56 87.10 92.30 2910.56 72.17 -6.31 358.22 358.28 91.01 0.07 MWD 33 3052.43 18.03 87.90 94.20 3000.25 79.68 -5.06 386.98 387.01 90.75 0.56 MWD 34 3076.17 17.92 87.50 23.80 3022.89 81.57 4.77 394.32 394.35 90.69 0.69 MWD 35 3140.40 17.57 88.00 64.20 3084.04 86.59 -4.00 413.87 413.89 90.55 0.59 MWD M 36 3235.11 18.84 88.90 94.70 3174.00 93.83 -3.20 443.45 443.46 90.41 1.37 MWD 37 3266.86 18.85 88.90 31.80 3204.09 96.27 -3.01 453.72 453.73 90.38 0.03 MWD 38 3361.92 18.55 89.80 95.00 3294.08 103.27 -2.66 484.17 484.18 90.31 0.44 MWD 39 3454.85 18.21 90.40 93.00 3382.33 109.63 -2.71 513.50 513.50 90.30 0.42 MWD 40 3547.66 17.90 89.90 92.80 3470.56 115.85 -2.79 542.26 542.26 90.29 0.37 MWD 41 3641.45 17.49 90.10 93.70 3559.83 122.08 -2.79 570.74 570.74 90.28 0.44 MWD 42 3736.40 17.58 92.70 95.00 3650.42 127.65 -3.49 599.34 599.35 90.33 0.83 MWD 43 3829.16 17.34 95.00 92.80 3738.94 131.90 -5.35 627.12 627.14 90.49 0.79 MWD 44 3920.56 16.92 95.10 91.40 3826.29 135.45 -7.72 653.94 653.98 90.68 0.46 MWD 45 4013.10 18.07 94.20 92.50 3914.51 139.32 -9.97 681.65 681.72 90.84 1.28 MWD 46 4106.97 18.12 96.00 93.90 4003.76 143.14 -12.56 710.70 710.81 91.01 0.60 MWD 47 4202.02 18.59 90.30 95.00 4093.94 148.08 -14.18 740.53 740.67 91.10 1.95 MWD 48 4297.44 18.49 88.90 95.40 4184.39 154.92 -13.97 770.86 770.99 91.04 0.48 MWD 49 4392.20 18.57 89.80 94.80 4274.27 161.84 -13.63 800.99 801.11 90.98 0.31 MWD 50 4486.13 18.09 90.40 93.90 4363.41 168.25 -13.68 830.52 830.63 90.94 0.55 MWD 51 4579.21 17.59 91.30 93.10 4452.03 174.07 -14.10 859.04 859.15 90.94 0.61 MWD 52 4672.22 19.15 94.00 93.00 4540.29 179.12 -15.49 888.31 888.44 91.00 1.91 MWD 53 4765.66 18.74 94.50 93.50 4628.73 183.55 -17.73 918.58 918.75 91.11 0.47 MWD 54 4859.03 18.21 96.70 93.30 4717.22 187.17 -20.61 948.00 948.22 91.25 0.94 MWD 55 4951.28 18.22 96.70 92.30 4804.89 190.15 -23.98 976.65 976.95 91.41 0.01 MWD 56 5046.30 17.98 94.90 95.00 4895.19 193.66 -26.96 1006.01 1006.37 91.54 0.64 MWD 57 5138.08 18.23 93.70 91.80 4982.45 197.79 -29.10 1034.46 1034.87 91.61 0.49 MWD 58 5232.22 18.12 93.80 94.10 5071.85 202.33 -31.02 1063.75 1064.20 91.67 0.12 MWD 59 5325.12 19.23 91.30 92.90 5159.86 207.55 -32.32 1093.46 1093.94 91.69 1.47 MWD 60 5426.04 19.03 89.40 100.90 5255.19 214.58 -32.53 1126.52 1126.99 91.65 0.65 MWD S 43 L1 Final surveys 6/19/97 Page 2 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Displacement Total displ ft at Azim. de DLS (deg/ 100f Survey tool e +N/S- ft +E/W- ft 61 5521.28 18.88 89.90 95.30 5345.32 221.53 -32.34 1157.47 1157.93 91.60 0.23 MWD 62 5614.92 18.93 88.80 93.60 5433.87 228.50 -31.99 1187.80 1188.23 91.54 0.38 MWD 63 5708.52 18.86 89.10 93.60 5522.43 235.67 -31.44 1218.10 1218.51 91.48 0.13 MWD 64 5804.45 19.01 88.80 95.90 5613.14 243.03 -30.87 1249.22 1249.60 91.42 0.19 MWD 65 5897.69 19.13 88.80 93.30 5701.32 250.31 -30.23 1279.69 1280.05 91.35 0.13 MWD 66 5992.08 19.18 87.80 94.40 5790.50 257.98 -29.31 1310.65 1310.98 91.28 0.35 MWD 67 6086.72 19.04 90.70 94.60 5879.88 265.15 -28.90 1341.61 1341.92 91.23 1.01 MWD 68 6180.16 19.06 91.40 93.50 5968.26 271.27 -29.46 1372.12 1372.44 91.23 0.25 MWD 69 6274.00 19.33 91.50 93.80 6056.85 277.25 -30.24 1402.95 1403.28 91.23 0.29 MWD 70 6367.02 18.01 84.80 93.00 6144.96 284.63 -29.34 1432.66 1432.96 91.17 2.71 MWD 71 6462.72 17.84 84.70 95.70 6236.02 293.67 -26.65 1461.99 1462.24 91.04 0.18 MWD 72 6556.21 18.12 87.00 93.50 6324.95 302.00 -24.56 1490.77 1490.98 90.94 0.82 MWD 73 6649.62 17.88 88.10 93.40 6413.78 309.51 -23.33 1519.61 1519.79 90.88 0.45 MWD 74 6741.45 17.95 86.90 91.80 6501.13 316.88 -22.09 1547.82 1547.98 90.82 0.41 MWD 75 6834.56 18.26 91.50 93.20 6589.72 323.59 -21.70 1576.76 1576.91 90.79 1.57 MWD 76 6928.64 18.36 94.40 94.00 6678.96 328.55 -23.22 1606.24 1606.41 90.83 0.97 MWD 77 7021.41 18.35 106.30 92.80 6767.07 329.71 -28.44 1634.84 1635.09 91.00 4.03 MWD 78 7113.36 18.23 102.90 92.00 6854.43 328.71 -35.72 1662.77 1663.15 91.23 1.17 MWD 79 7208.16 18.14 102.50 94.80 6944.49 328.68 -42.23 1691.63 1692.16 91.43 0.16 MWD 80 7302.29 18.33 102.00 94.10 7033.87 328.87 -48.47 1720.41 1721.09 91.61 0.26 MWD 81 7397.06 18.01 102.00 94.80 7123.94 329.20 -54.62 1749.32 1750.18 91.79 0.34 MWD 82 7492.17 17.70 103.60 95.10 7214.46 329.12 -61.08 1777.76 1778.80 91.97 0.61 MWD 83 7584.60 17.59 103.60 92.40 7302.51 328.64 -67.66 1804.98 1806.25 92.15 0.12 MWD 84 7678.22 17.70 102.60 93.60 7391.71 328.41 -74.09 1832.61 1834.11 92.32 0.34 MWD 85 7773.83 17.42 102.80 95.60 7482.85 328.37 -80.43 1860.75 1862.49 92.48 0.30 MWD 86 7867.95 18.86 101.40 94.10 7572.28 328.66 -86.56 1889.39 1891.38 92.62 1.60 MWD 87 7961.13 19.98 101.30 93.20 7660.17 329.35 -92.66 1919.78 1922.01 92.76 1.20 MWD 88 8056.03 20.30 101.80 94.90 7749.27 329.97 -99.20 1951.79 1954.31 92.91 0.38 MWD 89 8148.91 20.68 101.80 92.90 7836.29 330.44 -105.85 1983.62 1986.44 93.05 0.41 MWD 90 8242.59 20.47 102.70 93.70 7924.01 330.66 -112.84 2015.80 2018.96 93.20 0.41 MWD 91 8337.15 19.95 102.50 94.50 8012.70 330.67 -119.96 2047.66 2051.17 93.35 0.56 MWD 92 8397.27 19.89 102.00 60.20 8069.29 330.81 -124.31 2067.70 2071.44 93.44 0.30 MWD 93 8491.24 20.20 100.40 93.90 8157.51 331.62 -130.56 2099.27 2103.33 93.56 0.67 MWD 94 8523.01 22.78 96.70 31.80 8187.10 332.47 -132.27 2110.79 2114.93 93.59 9.16 MWD 95 8554.74 25.98 92.40 31.70 8215.97 334.33 -133.27 2123.83 2128.00 93.59 11.54 MWD 96 8585.91 28.93 90.20 31.20 8243.65 337.17 -133.59 2138.20 2142.37 93.57 10.00 MWD 97 8618.38 31.54 87.00 32.50 8271.73 341.16 -133.17 2154.56 2158.67 93.54 9.44 MWD 98 8649.31 33.36 84.10 30.90 8297.80 346.03 -131.87 2171.08 2175.08 93.48 7.75 MWD 99 8680.50 35.12 80.40 31.20 8323.60 352.16 -129.49 2188.47 2192.29 93.39 8.74 MWD 100 8710.99 36.30 79.60 30.50 8348.36 359.01 -126.40 2206.00 2209.62 93.28 4.16 MWD S 43 L1 Final surveys 6/19/97 Page 3 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Dis lacement Total displ ft at Azim. de DLS (deg/ 100f Survey tool e +N/S- ft +E/W- ft 101 8742.03 37.29 78.80 31.00 8373.19 366.39 -122.92 2224.24 2227.63 93.16 3.55 MWD 102 8772.63 39.62 75.80 30.60 8397.15 374.54 -118.73 2242.79 2245.93 93.03 9.75 MWD 103 8803.59 42.68 73.20 31.00 8420.49 384.17 -113.26 2262.44 2265.27 92.87 11.31 MWD 104 8833.21 45.20 71.00 29.60 8441.81 394.61 -106.94 2281.98 2284.48 92.68 9.95 MWD 105 8864.59 47.28 71.10 31.40 8463.52 406.48 -99.58 2303.42 2305.58 92.48 6.63 MWD 106 8894.57 49.95 70.40 30.00 8483.35 418.37 -92.16 2324.67 2326.50 92.27 9.07 MWD 107 8925.06 53.17 70.00 30.50 8502.31 431.18 -84.06 2347.15 2348.65 92.05 10.61 MWD 108 8957.08 56.55 68.80 32.00 8520.73 445.53 -74.85 2371.63 2372.81 91.81 11.00 MWD 109 8988.99 59.34 67.80 31.90 8537.66 460.78 -64.85 2396.75 2397.63 91.55 9.14 MWD 110 9020.51 61.65 66.20 31.50 8553.17 476.75 -54.14 2421.98 2422.59 91.28 8.56 MWD 111 9052.42 63.03 67.20 31.90 8567.98 493.33 -42.96 2447.93 2448.31 91.01 5.14 MWD 112 9083.95 63.31 65.40 31.50 8582.20 509.98 -31.67 2473.67 2473.87 90.73 5.18 MWD 113 9114.63 64.28 65.70 30.70 8595.76 526.58 -20.27 2498.74 2498.82 90.46 3.28 MWD 114 9145.88 66.03 66.10 31.30 8608.91 543.57 -8.67 2524.67 2524.68 90.20 5.71 MWD 115 9177.09 66.12 66.50 31.20 8621.56 560.47 2.79 2550.78 2550.78 89.94 1.21 MWD 116 9207.39 66.10 65.20 30.30 8633.83 577.05 14.13 2576.06 2576.10 89.69 3.92 MWD 117 9239.16 66.19 64.90 31.80 8646.69 594.79 26.40 2602.43 2602.56 89.42 0.91 MWD 118 9271.08 66.39 64.80 31.90 8659.52 612.68 38.81 2628.87 2629.15 89.15 0.69 MWD 119 9301.32 66.41 65.30 30.20 8671.61 629.56 50.48 2653.96 2654.44 88.91 1.52 MWD 120 9332.59 66.52 64.80 31.30 8684.11 647.06 62.59 2679.98 2680.71 88.66 1.51 MWD 121 9362.26 66.70 63.90 29.70 8695.90 663.95 74.39 2704.55 2705.57 88.42 2.85 MWD 122 9393.96 66.92 62.90 31.70 8708.38 682.38 87.43 2730.60 2732.00 88.17 2.98 MWD 123 9427.67 67.00 63.40 33.70 8721.57 702.09 101.44 2758.27 2760.14 87.89 1.39 MWD 124 9458.60 66.96 63.60 30.90 8733.66 720.04 114.13 2783.72 2786.06 87.65 0.61 MWD 125 9490.20 65.03 62.30 31.60 8746.51 738.47 127.26 2809.43 2812.31 87.41 7.17 MWD 126 9522.06 64.63 62.10 31.90 8760.08 757.19 140.72 2834.97 2838.46 87.16 1.38 MWD 127 9553.35 64.64 63.20 31.20 8773.44 775.31 153.67 2860.01 2864.14 86.92 3.19 MWD 128 9584.66 64.80 63.40 31.40 8786.85 793.30 166.43 2885.38 2890.17 86.70 0.77 MWD 129 9615.74 64.87 63.30 31.00 8800.04 811.07 179.01 2910.45 2915.95 86.48 0.37 MWD 130 9647.66 63.85 64.20 32.00 8813.88 829.17 191.77 2936.33 2942.58 86.26 4.07 MWD 131 9678.73 61.23 64.00 31.00 8828.18 846.31 203.79 2961.07 2968.07 86.06 8.47 MWD 132 9709.65 60.70 64.20 31.00 8843.22 863.19 215.63 2985.45 2993.23 85.87 1.80 MWD 133 9741.27 60.53 64.60 31.60 8858.73 880.23 227.52 3010.28 3018.87 85.68 1.23 MWD 134 9761.90 61.33 63.70 20.60 8868.74 891.45 235.39 3026.48 3035.62 85.55 5.75 MWD M 135 9778.11 61.43 62.90 16.20 8876.50 900.47 241.79 3039.18 3048.78 85.45 3.84 MWD M 136 9793.43 63.89 62.20 15.30 8883.52 909.22 248.06 3051.24 3061.30 85.35 16.58 MWD M 137 9811.73 61.40 18.30 8890.93 920.16 255.96 3065.98 3076.64 85.23 24.70 MWD M 138 9825.37 72.67 60.70 13.70 8895.50 928.73 262.21 3077.28 3088.43 85.13 31.90 MWD M 139 9839.54 77.70 60.10 14.10 8899.10 937.89 268.95 3089.12 3100.81 85.02 35.91 MWD M 140 9864.09 86.90 58.90 24.60 8902.40 954.54 281.31 3110.10 3122.80 84.83 37.71 MWD S43L1 Final surveys 6/19/97 Page 4 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Dis lacement Total displ ft at Azim. de DLS (deg/ 100 Survey tool e +N/S- ft +E/W- ft 141 9896.42 92.02 56.50 32.30 8902.70 977.34 298.56 3137.40 3151.57 84.56 17.50 MWD 142 9926.94 94.30 51.40 30.50 8901.02 1000.20 316.47 3162.01 3177.81 84.28 18.29 MWD 143 9958.59 95.05 47.10 31.70 8898.43 1025.57 337.11 3185.92 3203.70 83.96 14.04 MWD 144 9990.00 96.00 47.40 31.40 8895.41 1051.30 358.35 3208.85 3228.80 83.63 3.28 MWD 145 10009.55 96.90 46.70 19.60 8893.21 1067.37 371.62 3223.11 3244.46 83.42 5.80 MWD 146 10041.89 96.70 43.80 32.30 8889.38 1094.38 394.19 3245.88 3269.73 83.08 8.94 MWD 147 10073.20 95.35 44.90 31.30 8886.10 1120.86 416.45 3267.64 3294.07 82.74 5.55 MWD 148 10105.14 92.70 45.20 31.90 8883.86 1147.72 438.93 3290.16 3319.31 82.40 8.36 MWD 149 10137.18 91.30 44.90 32.10 8882.74 1174.80 461.59 3312.86 3344.86 82.07 4.46 MWD 150 10169.36 91.45 45.20 32.20 8881.97 1201.97 484.34 3335.64 3370.62 81.74 1.04 MWD 151 10201.10 ' 91.40 45.20 31.70 8881.18 1228.68 506.67 3358.13 3396.14 81.42 0.16 MWD 152 10233.32 91.35 44.90 32.20 8880.41 1255.85 529.41 3380.91 3422.11 81.10 0.94 MWD 153 10265.71 90.75 44.20 32.40 8879.81 1283.34 552.49 3403.64 3448.19 80.78 2.85 MWD 154 10296.36 90.80 44.20 30.70 8879.40 1309.50 574.50 3425.04 3472.89 80.48 0.16 MWD 155 10328.11 90.05 44.20 31.70 8879.16 1336.51 597.23 3447.14 3498.49 80.17 2.37 MWD 156 10360.25 90.10 43.40 32.20 8879.12 1364.06 620.47 3469.42 3524.47 79.86 2.49 MWD 157 10391.01 90.30 43.50 30.70 8879.01 1390.44 642.77 3490.52 3549.21 79.57 0.65 MWD 158 10423.31 90.75 43.80 32.30 8878.72 1418.13 666.16 3512.79 3575.40 79.26 1.86 MWD 159 10455.19 92.10 43.50 31.90 8877.92 1445.47 689.26 3534.78 3601.36 78.97 4.41 MWD 160 10487.34 91.75 43.10 32.10 8876.84 1473.08 712.62 3556.76 3627.45 78.67 1.44 MWD 161 10519.96 91.60 43.10 32.70 8875.89 1501.25 736.49 3579.10 3654.09 78.37 0.46 MWD 162 10551.93 91.60 43.10 31.90 8875.00 1528.74 759.77 3600.89 3680.17 78.09 0.00 MWD 163 10584.23 91.55 43.10 32.30 8874.11 1556.57 783.35 3622.95 3706.67 77.80 0.15 MWD 164 10615.87 91.55 43.80 31.70 8873.25 1583.78 806.35 3644.74 3732.87 77.52 2.21 MWD 165 10647.73 91.45 45.20 31.80 8872.42 1610.77 829.03 3667.02 3759.56 77.26 4.41 MWD 166 10679.90 91.45 44.20 32.20 8871.61 1638.05 851.91 3689.66 3786.73 77.00 3.10 MWD 167 10713.46 91.35 44.50 33.60 8870.79 1666.62 875.93 3713.14 3815.06 76.73 0.94 MWD M 168 10743.02 91.40 46.30 29.50 8870.08 1691.42 896.63 3734.14 3840.28 76.50 6.10 MWD M 169 10774.27 91.15 45.20 31.30 8869.38 1717.63 918.47 3756.56 3867.21 76.26 3.60 MWD 170 10806.71 90.95 45.60 32.40 8868.79 1744.87 941.21 3779.62 3895.05 76.02 1.38 MWD M 171 10838.85 89.70 44.90 32.10 8868.61 1771.90 963.81 3802.42 3922.67 75.78 4.46 MWD 172 10871.32 88.95 42.70 32.50 8868.99 1799.71 987.26 3824.91 3950.27 75.53 7.15 MWD 173 10903.40 88.65 40.90 32.10 8869.66 1827.73 1011.19 3846.30 3977.00 75.27 5.68 MWD 174 10935.39 88.95 39.10 32.00 8870.33 1856.14 1035.70 3866.86 4003.16 75.01 5.70 MWD 175 10967.24 89.50 37.30 31.80 8870.76 1884.82 1060.68 3886.53 4028.66 74.74 5.92 MWD 176 10999.14 89.70 35.20 31.90 8870.98 1914.05 1086.41 3905.39 4053.68 74.45 6.61 MWD 177 11030.85 89.50 32.60 31.70 8871.20 1943.58 1112.71 3923.07 4077.81 74.16 8.23 MWD 178 11063.09 89.35 31.60 32.30 8871.53 1974.03 1140.07 3940.23 4101.85 73.86 3.13 MWD 179 11094.58 89.70 30.10 31.50 8871.79 2003.95 1167.12 3956.38 4124.94 73.56 4.89 MWD 180 11126.80 90.20 29.80 32.20 8871.82 2034.69 1195.02 3972.46 4148.31 73.26 1.81 MWD S 43 L1 Final surveys 6/19/97 Page 5 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Dis lacement Total displ ft at Azim. de DLS (deg/ 100f Survey tool e +N/S- ft +E/W- ft 181 11158.21 90.65 29.00 31.40 8871.58 2064.76 1222.37 3987.87 4171.01 72.96 2.92 MWD 182 11188.47 91.65 27.30 30.30 8870.98 2093.94 1249.08 4002.16 4192.55 72.67 6.51 MWD 183 11219.86 92.05 27.60 31.40 8869.96 2124.28 1276.93 4016.63 4214.72 72.36 1.59 MWD 184 11251.94 90.60 27.60 32.00 8869.22 2155.19 1305.28 4031.45 4237.49 72.06 4.53 MWD 185 11284.06 88.75 27.60 32.20 8869.40 2186.29 1333.81 4046.37 4260.53 71.76 5.75 MWD 186 11315.99 87.65 27.60 31.90 8870.41 2217.10 1362.07 4061.14 4283.47 71.46 3.45 MWD 187 11347.65 87.55 27.60 31.60 8871.73 2247.60 1390.05 4075.77 4306.29 71.17 0.32 MWD 188 11379.72 87.50 26.90 32.10 8873.12 2278.63 1418.56 4090.45 4329.44 70.87 2.18 MWD 189 11411.35 87.10 26.90 31.70 8874.61 2309.32 1446.80 4104.78 4352.29 70.58 1.26 MWD 190 11442.77 86.85 26.50 31.40 8876.27 2339.73 1474.81 4118.87 4374.94 70.30 1.50 MWD 191 11474.28 86.85 26.50 31.50 8878.00 2370.27 1502.96 4132.90 4397.70 70.02 0.00 MWD 192 11505.94 87.80 26.20 31.60 8879.47 2400.93 1531.24 4146.91 4420.59 69.73 3.15 MWD 193 11537.48 88.65 25.80 31.60 8880.45 2431.66 1559.63 4160.76 4443.46 69.45 2.97 MWD 194 11569.53 89.70 24.40 32.00 8880.91 2462.90 1588.61 4174.33 4466.40 69.16 5.47 MWD 195 11601.08 89.80 24.40 31.60 8881.05 2493.84 1617.38 4187.38 4488.89 68.88 0.32 MWD 196 11631.38 90.80 24.70 30.30 8880.89 2523.48 1644.94 4199.97 4510.61 68.61 3.45 MWD 197 11663.14 91.90 25.10 31.70 8880.14 2554.45 1673.69 4213.31 4533.57 68.34 3.69 MWD 198 11695.01 92.30 25.10 31.90 8878.97 2585.57 1702.56 4226.84 4556.85 68.06 1.25 MWD 199 11726.52 92.70 25.10 31.50 8877.60 2616.30 1731.06 4240.19 4579.93 67.79 1.27 MWD 200 11758.11 91.85 24.40 31.60 8876.35 2647.17 1759.73 4253.41 4603.05 67.52 3.48 MWD 201 11790.01 89.45 22.90 31.90 8875.98 2678.48 1788.95 4266.20 4626.10 67.25 8.87 MWD 202 11821.94 88.55 21.80 31.90 8876.54 2709.92 1818.44 4278.33 4648.75 66.97 4.45 MWD 203 11853.71 89.00 22.20 31.80 8877.22 2741.28 1847.92 4290.24 4671.29 66.70 1.89 MWD 204 11885.77 89.90 22.60 32.10 8877.53 2772.92 1877.60 4302.47 4694.32 66.42 3.07 MWD 205 11917.67 90.90 22.60 31.90 8877.31 2804.33 1907.05 4314.73 4717.38 66.16 3.13 MWD 206 11949.93 90.25 20.40 32.20 8876.98 2836.15 1937.00 4326.53 4740.34 65.88 7.12 MWD 207 11981.43 90.10 19.70 31.50 8876.89 2867.38 1966.59 4337.33 4762.34 65.61 2.27 MWD 208 12013.29 90.50 20.00 31.90 8876.72 2899.03 1996.60 4348.16 4784.65 65.34 1.57 MWD 209 12045.95 89.95 19.70 32.70 8876.59 2931.47 2027.35 4359.26 4807.63 65.06 1.92 MWD 210 12077.60 89.40 16.10 31.60 8876.77 2962.93 2057.42 4368.97 4829.17 64.78 11.52 MWD 211 12109.41 88.85 12.80 31.80 8877.26 2994.71 2088.21 4376.91 4849.53 64.49 10.52 MWD 212 12140.96 88.95 10.30 31.60 8877.86 3026.29 2119.16 4383.23 4868.63 64.20 7.92 MWD 213 12172.92 87.55 7.10 31.90 8878.84 3058.10 2150.67 4388.05 4886.76 63.89 10.94 MWD M 214 12205.28 86.40 3.80 32.40 8880.55 3090.19 2182.87 4391.13 4903.77 63.57 10.77 MWD M 215 12237.08 86.05 0.30 31.80 8882.64 3121.37 2214.58 4392.23 4918.95 63.24 11.35 MWD 216 12268.84 87.25 359.90 31.70 8884.50 3152.26 2246.23 4392.26 4933.30 62.91 3.90 MWD 217 12300.36 89.90 359.20 31.60 8885.28 3183.03 2277.81 4392.01 4947.55 62.59 8.67 MWD 218 12332.44 91.70 358.50 32.00 8884.83 3214.09 2309.80 4391.34 4961.76 62.26 6.16 MWD 219 12364.31 91.65 359.20 31.90 8883.90 3245.06 2341.68 4390.68 4976.09 61.93 2.51 MWD 220 12395.57 91.35 357.70 31.30 8883.08 3275.39 2372.96 4389.83 4990.14 61.61 4.89 MWD S 43 L1 Final surveys 6/19/97 Page 6 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Dis lacement Total displ ft at Azim. de DLS (deg/ 100f Survey tool e +N/S- ft +E/W- ft 221 12427.38 92.05 354.50 31.80 8882.14 3305.86 2404.66 4387.67 5003.40 61.28 10.30 MWD 222 12459.64 93.95 355.20 32.20 8880.45 3336.48 2436.69 4384.78 5016.35 60.94 6.29 MWD 223 12491.07 94.35 356.70 31.50 8878.17 3366.56 2468.02 4382.54 5029.69 60.61 4.61 MWD 224 12523.13 94.65 356.70 32.00 8875.66 3397.22 2499.87 4380.64 5043.75 60.29 0.94 MWD 225 12553.75 94.40 357.00 30.60 8873.25 3426.57 2530.33 4378.94 5057.44 59.98 1.54 MWD 226 12585.12 94.00 357.40 31.40 8870.95 3456.76 2561.60 4377.41 5071.84 59.66 1.80 MWD 227 12617.13 93.85 357.70 32.00 8868.76 3487.58 2593.50 4376.05 5086.85 59.35 1.05 MWD 228 12646.25 94.30 358.50 29.10 8866.69 3515.68 2622.51 4375.06 5100.85 59.06 2.85 MWD 229 12679.88 93.95 359.50 33.70 8864.27 3548.34 2656.12 4374.44 5117.69 58.73 3.42 MWD 230 12711.90 93.35 358.80 32.00 8862.23 3579.39 2688.05 4373.97 5133.93 58.43 2.88 MWD 231 12743.64 94.45 355.60 31.70 8860.07 3609.87 2719.63 4372.43 5149.22 58.12 10.65 MWD 232 12775.75 96.95 353.10 32.10 8856.88 -1641^,•.19 2751.41 4369.25 5163.40 57.80 11.21 MWD 233 12808.70 97.76 355.40 33.00 8852.66 3671.24 2783.97 4365.95 5178.03 57.48 7.62 MWD M 234 12839.73 97.35 354.20 31.00 8848.58 3700.49 2814.57 4363.16 5192.21 57.17 4.06 MWD M 235 12871.27 97.20 353.90 31.60 8844.58 3730.20 2845.75 4359.91 5206.45 56.87 1.05 MWD M 236 12902.90 97.00 353.30 31.60 8840.67 3759.84 2876.91 4356.39 5220.61 56.56 2.29 MWD M 237 12934.53 96.80 352.80 31.60 8836.88 3789.38 2908.05 4352.57 5234.65 56.25 1.41 MWD M 238 12966.11 96.95 352.80 31.60 8833.10 3818.90 2939.17 4348.63 5248.75 55.95 0.47 MWD M 239 12998.10 94.85 352.40 32.00 8829.81 3848.80 2970.73 4344.54 5263.10 55.64 6.68 MWD M 240 13030.10 93.75 350.60 32.00 8827.41 3878.56 3002.29 4339.82 5277.10 55.32 6.58 MWD M 241 13062.17 91.85 351.40 32.10 8825.84 3908.35 3033.95 4334.78 5291.04 55.01 6.31 MWD M 242 13094.17 90.50 350.30 32.00 8825.18 3938.05 3065.53 4329.66 5305.04 54.70 5.25 MWD M 243 13126.23 89.95 349.20 32.00 8825.06 3967.53 3097.02 4323.97 5318.67 54.39 3.84 MWD M 244 13158.23 89.20 348.80 32.00 8825.29 3996.85 3128.43 4317.86 5332.07 54.08 2.66 MWD M 245 13190.25 90.00 348.50 32.00 8825.52 4026.09 3159.81 4311.56 5345.46 53.76 2.67 MWD M 246 13222.03 90.75 350.30 31.80 8825.31 4055.31 3191.06 4305.71 5359.30 53.46 6.13 MWD M 247 13253.71 90.80 350.30 31.70 8824.88 4084.63 3222.30 4300.37 5373.68 53.16 0.16 MWD M 248 13285.84 91.50 348.80 32.10 8824.24 4114.15 3253.86 4294.55 5388.03 52.85 5.16 MWD M 249 13317.32 91.95 349.90 31.50 8823.29 4143.07 3284.81 4288.73 5402.15 52.55 3.77 MWD M 250 13349.51 92.05 350.90 32.20 8822.17 4172.86 3316.54 4283.37 5417.25 52.25 3.12 MWD M 251 13381.40 89.60 349.50 31.90 8821.71 4202.33 3347.96 4277.91 5432.25 51.95 9.00 MWD M 252 13413.01 87.75 349.80 31.60 8822.44 4231.40 3379.03 4272.21 5446.98 51.66 5.99 MWD M 253 13444.67 86.05 349.10 31.70 8824.15 4260.50 3410.15 4266.41 5461.81 51.36 5.80 MWD M 254 13476.82 86.05 349.10 32.10 8826.36 4289.86 3441.59 4260.36 5476.79 51.07 0.00 MWD M 255 13509.35 85.55 348.70 32.50 8828.74 4319.53 3473.40 4254.12 5492.00 50.77 1.97 MWD M 256 13541.31 85.85 348.40 32.00 8831.14 4348.67 3504.68 4247.78 5506.94 50.48 1.32 MWD M 257 13572.92 87.85 349.50 31.60 8832.88 4377.55 3535.64 4241.71 5522.03 50.19 7.07 MWD M 258 13605.07 88.70 349.50 32.20 8833.85 4407.14 3567.28 4235.82 5537.83 49.90 2.66 MWD M 259 13637.34 88.35 350.20 32.20 8834.68 4436.81 3598.96 4230.14 5553.98 49.61 2.43 MWD M 260 13668.94 88.20 350.90 31.60 8835.63 4466.08 3630.12 4224.96 5570.28 49.33 2.26 MWD M S43L1 Final surveys 6/19/97 Page 7 Seq # Measured Depth ft Incl angle de Azim angle de Course length ft TVD depth ft Vertical section ft Dis lacement Total displ ft at Azim. de DLS (deg/ 100f Survey tool e +N/S- ft +E/W- ft 261 13700.87 88.10 350.20 32.00 8836.66 4495.72 3661.67 4219.71 5586.93 49.05 2.21 MWD M 262 13732.81 88.00 350.50 31.90 8837.75 4525.22 3693.10 4214.36 5603.56 48.77 0.99 MWD M 263 13764.87 88.20 350.50 32.10 8838.81 4554.94 3724.74 4209.07 5620.49 48.49 0.62 MWD M 264 13796.62 88.50 350.90 31.70 8839.72 4584.33 3756.01 4203.95 5637.44 48.22 1.58 MWD M 265 13828.53 88.60 350.50 31.90 8840.53 4613.92 3787.48 4198.79 5654.63 47.95 1.29 MWD M 266 13860.67 88.75 350.50 32.20 8841.28 4643.74 3819.23 4193.48 5672.02 47.67 0.47 MWD M 267 13892.55 88.75 349.50 31.80 8841.97 4673.07 3850.54 4187.93 5689.06 47.40 3.46 MWD M 268 13924.81 88.80 350.20 32.30 8842.66 4702.83 3882.32 4182.21 5706.43 47.13 2.48 MWD M 269 13956.36 88.95 350.20 31.60 8843.28 4732.04 3913.45 4176.84 5723.73 46.86 0.47 MWD M 270 13988.04 89.10 349.50 31.60 8843.82 4761.16 3944.55 4171.24 5740.97 46.60 2.58 MWD M 271 14012.98 89.50 350.20 25.00 8844.12 4784.20 3969.15 4166.81 5754.69 46.39 3.58 MWD M 272 14061.00 89.50 350.20 48.00 8844.54 4828.56 4016.45 4158.65 5781.54 46.00 0.00 PROJ [(c)1997 Anadrill IDEAL ] S 43 L1 Final surveys 6/19/97 Page 8 M 47 -GS -2 SP EXPLORATION BP Exploration (Alaska) Inc. PO Box 196812 Anchorage, Alaska 99519-6612 MESSAGE# T5L5C0P'Y R E Ct E I Vr' E rL,')' COMMUNICATIONS CENTER MAY 14 1997 QM. A as Canso 00060'11; TO; Name: ?ULAiL�rao;�c�� �► _ Company: A0 rn c.c Location: Fax # 27(o- -7 S4 Z Confirm # FROM: Name & Ext.: bAVi o 14 AKAM- LA. izA S-(. - 9'160 6 Department; 55 D R / $ PK A Mail Stop: NOTES: S - 3 LEAK. yF,r- P?4 EM%A) ■ CoM P LkT Io^t bjAGILAm loci w No c`vtLic'ea�b� of �;wt�L�con •1e( PAGES TO FOLLOW S` (Do Not Inotude Cover Sheet) 7 heareSorv- o�- fo adwA "AUL-L5_ G"t Q-& 00-06a (eig- SECURITY CLASSIFICATION PRIVATE SECRET CONFIDENTIAL For Communications Center Use Only Telecopy # Time In Time Sent Confirm # Time Confirmed Confirmed By Operator T I IrIT I 1-11Jf11J�17 JSP 1M4Tb - JM J57 , t;7T 1HI.I NABORS18E DRL FAX ID: MAY 0619( 21:1e NO -U12 N.03 P 'A HOI1HNO-IdX3 d3 W02P : ZO L6, PZ AUW -W-LEA16 OFF DASA - -C-IMG 1T DATA ARM, ...... . .. .- 86M ... ..L 1 ... 3I .. �_ I 1 3" .1 1 1 .. • _.I ..�.w�.ri • •\.• ... YY. -__u _r__i.. •.... .• V . • _IIIIu_ /.1 . • 11 1i'W • —1 ' 11 ' • 111f1�{i� • __. 1 . 1 . •.. . • • 11 Y. N.I.M+....��. �>• �� , _.Y_ 1 1 • 1 r . .1 AV„ ' ZVO 11W 1 ■11 rN- •' ,ir/r1 1 17M • 1. • 1 ' . 1 101 - A 1. tfiflil: ._ ... ,.1....1.1 _.1.._..._.1. , 1 ,.. . I, i 32X1 . _^rlp .u•... 1 �, 1(K0 ... . 1 ..,. .. • 1 , 'ion —.1.�.w....�... � --• —,--- �',{� . W�/V. _ .. � ;Irl•• -•a r�� ....:.. .�.... n 1_•1 . 1 r .. 1 ayyW//�, • � XI.II�P r ` 1 �_ .�.N • • . • n . . 1 . •1 • 1 1. • iLY?v(T ^I u• .� _.wNI.�Y+_ . 1.1 .1 fit -M U IU 247 30. A ' ittakw (M o0 ' , . .,. ..... r,_•n_1•.•1 ..I 1. ... I.. urm• , ;_._ nKKn VV qq meq` �^.Y� _1__r•_uuu ...*,:11�n1•....SI c�.• 1M�C Alilska ail a Gas Cons. GQmnl.iss-w Anchorage P 'A HOI1HNO-IdX3 d3 W02P : ZO L6, PZ AUW NAHORSISE DRL FAX ID: MAY 05'97 21:17 P u•.•y, •Ir. 1� if Irwl■ wwrr• •� LEAK-0Ff DATA—i—CAM& NU DATAJ. WOO ' 3600 1oo UOU 33A3W �!/{m 31W M) 74* NOp POO* 26W ' 1�1t10 2340 Pira► 2(W • � wo )WO G4 O 1 POMC . y14M 1300 120 11CA, 1000 W /� j�� {/,00 {ilk 400 �M 100 0 ,.uw,, •r •r.•, • .' r a •.r tap. •�M•ua \ - •r ilrr••�i as •.- • to ww I/I/Ilara�•`r •.�/N• r�r� • • . •/Y.�r _+. •w./.1• ♦ 11 . r■ II•• ' 1 1, • rrrr• 1 1, _• r a♦HY , , u_•�rr . 70 _..�� .. S -�. �I�Ir a Yr.r ."do ♦ 1 1 Y 1 111 1 1 • •1 ,1. 1 •.ww1-r"11. .•.. ••a••r . i • 1 111 11 . r -•. .. •r• __r�_r ,...,�\ a MIA& �YYMA. ; .r. -_r• �M• .�• . • 1 . ,a 110 , . , �� r • . w, •1..1 11(',.. Y••Y�.■ AlIdI.- r I �A.�._1 •••- � I rr 1 r . r r • • a Mlrl.•u�•�•u•ur• �-. a . r ru•.• ■u_WIIi,L.r►INR.•,ru IIIIIp,11���__- •/r� -.. ' 1 Iwo , .,fly♦•!rte •,• 1'I��I••!• •fu_.• • . �•�/ ••-r• • P J • rl///•IMI•/1�/ • Wr\.VTTrr -t•' r ' ' ./r .. •air •9r_ir .. .1r .r w Irl IIMI/ all, ._/.ir�,rr MIM 41 •.•. a i r • - ...�..r.'. r••.r�l.._r.r • r r r...+. _. �i 1Q IS 20 95 , 40 Tun! tMin~ t7 'A NOI IHNO1dXA da WHEb : ZO ZG , PT AUW NPBORSISE DRL FAX ID: MAY 06'97 21:15 No.012 P.02 aSING AND LEAK•OFf ERACTURN XE$TO c sq U161tiA TIVq u. 94W 40s rase IBTG Svpon or; John Ren _ CsW Sol llrig DopAt 3120 . TMD . -.-ft.AQ_=WD Mild wol jhrl: 8 ppp Imokoff pre�r arc 1:,67 ppg . Hale DGp1ht 5155 mica Pumpoci. 2.0 Bbb Valum Book LEAK -OFF DATA CAIIIND TEST DATA Enter WOW Rplia Piamours Enter •t *9v I nwr Mum HereNero HEM 1"ro „ray 0 1 0 ySmi %! 140 b 340 . _. . h .... ...n. 1 .. . .. X4.40 _ 1 Q ' _ 630 . �. � is 62.0 �� t8 800 ��` 20 ' BfiO �11 �4a go 1420 y . _..rr.rr.rr.Y.rn M•�•iw.._ _�r.r 1 � i t/ ! alis Palo N ,• 1:1 40 2440 45 Palo 48 !�, . A•.c1 . r 1 Fntnr* iriirlinn Entar Walding ( It®r inq • Entnr I Inldlno Tima I lora Prowura I•lere Time Hare Promra I lore+ `. 9►V.,i I 1 450 0 , xoon 1 . w . ... /l..r/• •l..r . r . rw w.rvrr.►..r• 640 � a 3006 ' 4 510 .3 '3000 I A9G ..� 4 3tXi0 r�..r lnA. 1 .•H •�wA _.. r�t✓r. ,;► ' y: r n a E -- 3000 410 1 s _ 2000 20 FOOD 404 ...... _ :� ; 3000 ,>, r 1 34 3000 .�5`I.,1 1' ' _... r r .0 .x . . r . 1 . .r. _ ' _' .�•.1 1 a . . . .. r.. u... 8 ® •I � I � NA IAY 14 1997 Al Gas Cons. OQMMISB't •; - -1 I nT I H?4(11,4u74 49 WH7b ! ) n );7,, bT ),HW AI<ASKA OIL AND GAS CONSERVATIO3T COMMISSION March 27. 1997 Paul Prince Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit S-431-1 BP Exploration (Alaska) Inc. Permit No: 97-53 Sur. Loc.: 4211'NSL, 4503'WEL, Sec. 35, Tl -'N. R12E, UM Btmhole Loc: 2858'NSL. 229'WEL, Sec. 26. T12N, R12E, UM Dear Mr. Prince: TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining- additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The permit is for a new segment from existing well S43, Permit No. 97-52, API No. 50-029- 22754. Production should continue to be reported as a function of the original well identifier. Blowout prevention equipment (BOPS) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Mary Marshburn Commissioner BY ORDER OF THE COMMISSION d1E'enclosures cc: Department of Fish & Game. Habitat Section w/o encl. Department of En%inornment Conservation w/o enol. Steve McMains - AOGCC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1a. Type of work ® Drill ❑ Redrill 1 b. Type of well ElExploratory E]Stratigraphic Test ® Development Oil E] Re -Entry E] Deepen: ❑ Service ❑ Development Gas ❑ Single Zone []Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 66.9' Prudhoe Bay Field / Prudhoe Bay Pool 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028257 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 4211' NSL, 4503' WEL, SEC. 35, T12N, R12E, UPM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 4824' NSL, 974' WEL, SEC. 35, T12N, R12E, UPM S-431_1 At total depth Amount $200,000.00 9. Approximate spud date 2858' NSL, 229' WEL, SEC. 26, T12N, R12E, UPM 04/11/97 12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047448, 2422' 1 S-44, 29' away at 1500' MD 2560 14096' MD / 8877' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e) (2)) Kick Off Depth 1500' Maximum Hole An le 91.3 ° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' Surface Surface 110' 110' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC -Mod 3120' Surface Surface 3120' 3067' 120 sx CSlll, 500 sx'G', 1865 sx CSIII 8-1/2" 7" 26# L-80 BTC -Mod 10216' Surface Surface 10216' 8996' 580 sx Class 'G' 6" 4-1/2" 12.6# L-80 NSCT 4276' 9820' 8888' 14096' 8877' Uncemented Slotted Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface �.. Intermediate a Production Liner 29,97 Perforation depth: measured R true vertical 20. Attachments ® Filing Fee ❑ Property Plat ❑ BOP Sketch ❑ Diverter Sketch ® Drilling Program ® Drilling Fluid Program ❑ Time vs Depth Plot ❑ Refraction Analysis ❑ Seabed Report ❑ 20 AAC 25.050 Requirements Contact Engineer Name/ umber: David Nakamura, 564-5606 Prepared By Name/Number. • Terrie Hubble, 564-4628 21. 1 hereby certify that th rego"n i tr a and correct to the best of my knowledge 3113 jq'l Signed Paul Prince - Title Senior Drilling Engineer Date Commission Use Only Permit Number - API Number % 491� Approval Date See cover letter 50- o ZZ 2, 1 .C'7 for other requirements Conditions of Approval: Samples Required ❑ Yes X No Mud Log Required ❑ Yes Flo, Hydrogen Sulfide Measures ,krYes ❑ No Directional Survey Required A Yes ❑ No Required Working Pressure for BOPE ❑ 2M; ❑ 3M; ,K5M; ❑ 10M; ❑ 15M Other: by order of Approved By Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate Well Name: I S-43 / S -43L1 Well Plan Summary Type of Well(producer or injector): I Oil Producer Surface Location: 4211' FSL 4503' FEL Sec 35 T12N R12E 1801' 1800' Sadlerochit Zone 4 lower Lateral Start of Horizontal Location: 4797' FSL 975' FEL Sec 35 T12N R12E End of Horizontal Location: 2858' FSL 229' FEL Sec 26 T12N R12E 6742' TVD UL : Sag River (upper) Lateral Start of Horizontal Location: 4824' FSL 974' FEL Sec 35 T12N R12E End of Horizontal Location: 2858' FSL 229' FEL Sec 26 T12N R12E AFE Number: 14PO755 Rig: Nabors 18E Estimated Start Date: Aril 1 1 Operating days to complete: 145 1801' 1800' SV3 2819' 2782' U nu -GL 29.7' MD LL : 14082' West Sak TVD (LL): 9022'T MD UL : 14096' 6997' 6742' TVD UL : 8877' KBE: 66.9' Well Design (conventional, slimhole, etc.) Ultra Slimhole High Angle Multi -Lateral (targeting Sadlerochit Zone 4 and Sag River Formation Markers: Formation Tops MD TVD RKB Base Permafrost 1801' 1800' SV3 2819' 2782' U nu 3689' 3607' West Sak 5040' 4887' Ku aruk 6997' 6742' LCU 7055' 6797' Kin ak 7914' 7612' J -D 8604' 8264' J -B 9406' 8714' Sag River 9756' 8862' Shublik 9851' 8902' Sadlerochit 10136' 8992' TD of Sadlerochit Lateral 14082' 9022' Sag Lateral Kickoff 9798' 8879' TD of Sag River Lateral 14096' 8877' 1997 :�4e�tit3�{ �-,9�,•'.��, 5._'7:�� +e`:7a�ti> 4i�ilil:;ied�lf'rb� S-43 / S-431_1 Permit Info Page 1 Casinq/Tubinq Program: Hole Size Csg/ Tb O.D. Wt/Ft Grade Conn. Length Top MD/TVD Btm MD/TVD 30" 20" 91.5# H-40 Weld 80' Surface 1101/110' 12-1/4" 9-5/8" 40# L-80 BTC- MOD 3120' Surface 312073067' 8-1/2" 7" 26# L-80 BTC- MOD 10216' -T Surface 1021678996' 1 Lower Lateral 6" 4-1/211 12.6# L-80 IBT- MOD 2193' 1006678978' 1225979041' 6" 4-1/2" 12.6# L-80 NSCT 1823' 1225979041' 1408279022' Upper Lateral 6" 1 4-1/2" 12.6# L-80 NSCT 4276' 982078888' 1409678877' Tubing 4-1/2" 12.6# L-80 IBT- MOD 9748' Surface 9748'/8858' Logginq Program: Logs: 91.30 12-1/4" Hole ........................................................ 8-1/2" Hole ........................................................ 6" Sadlerochit MWD Directional MWD: GR/Directional MWD: GR/Resistivity/Directional ........................................................ 6" Sa River MWD: GR/Resistivity/Directional Cased Hole: Optional: CNUCBT Directional: KOP: 1 1500' Maximum Hole Angle: 91.30 Tangent Angle 30.0° Close Approach Well: S-44 (29' away at 1500' MD) and S-42 (32' away at 1400' MD rk C--. C, in -hvg I= U ,,i��.�. 199 7 1, us- k a 0'11 i1-, s'I,a3 C034f5, CC -5 fiia-3i01rs r;,. tII f<f. S-43 / S-431-1 Permit Info Page 2 Mud Program: Surface Mud Properties: I Surface hole section: SPUD Mud Properties: I Intermediate Density Marsh PPG Viscosity Yield 10 sec Point gel 10 min gel pH Fluid Loss Initial 8.5 ± 300 40-60 30-60 50-80 9-10 15-25 Final 9.5 200-300 25-50 15-25 25-40 9-10 15-25 Hazards/Concerns Due to light gravel expectations, no real concerns in surface hole. Intermediate Mud Properties: I Intermediate hole section: LSND Density PPG Viscosity Density Marsh Yield 10 sec 10 min pH Fluid Hazards/Concerns PPG Viscosity Point gel gel Differential sticking possible with overbalance situation. Loss Initial 8.8-9.0 35-40 8-12 3-6 8-10 9.0-9.5 8-12 Cretaceous 10.0 40-45 10-12 4-8 8-12 9.0-9.5 6-8 Final 10.0 45-50 12-15 4-8 8-12 9-10 <6 HTH P-13.0 Hazards/Concerns Cretaceous overpressure expected, MW to be at least 10.0 ppg. Utilize hi vis sweeps to assist hole cleaning Monitor LSYP and increase if problems occur trying to clean the hole. Potential high torque could need lubricants (EP MudLube) Reduce API fluid loss to <6 cc before drilling Kingak Section. If high torque is encountered, respond with lubricants. Note: The Jurassic shales may be troublesome, so treat with 2 ppb Baratrol and 6 ppb Baranex. Sadlerochit Mud Pro erties: I Production hole section: QUCIKDRILn for Sadlerochit lateral Depth Density Marsh LSRV LSRYP pH Density PPG Viscosity LSRV Initial 8.7-8.9 50-65 >45,000 10-20 8.5-9.0 Final 8.8-9.0 50-60 30-40 15-20 8.5-9.0 Hazards/Concerns Lost Circulation a possibility due to overbalance in Sadlerochit. Initial 8.7-8.9 Differential sticking possible with overbalance situation. >45,000 10-20 8.5-9.0 Perform/report daily checks on KCI concentrations in Xanvis KCI system. 8.8-9.0 50-60 High torque may be experienced and should be countered with lubricants LubeTex Sag River Mud Properties. Production hole section: QUCIKDRILn for Sag River lateral Depth Density Marsh LSRV LSRYP pH PPG Viscosity Initial 8.7-8.9 50-65 >45,000 10-20 8.5-9.0 Final 8.8-9.0 50-60 30-40 15-20 8.5-9.0 Hazards/Concerns Lost Circulation a possibility due to overbalance in Sag River Differential sticking possible with overbalance situation. Perform/report daily checks on KCI concentrations in Xanvis KCI system. High torque may be experienced and should be countered with lubricants LubeTex Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. S-43 / S-431-1 Permit Info Page 3 PROPOSED DRILLING AND COMPLETION PROGRAM WELL: S-43 / S-43 L 1 MIRU. NU diverter and function test same. 2. Drill 12-1/4" hole to ±3120' MD/3067' TVD. Run and cement 9-5/8" 40# L-80 BTC -MOD casing to surface with Halliburton ES Cementer (two stage surface cement job). 3. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Function test BOPE to 5000/250 psi. 4. Test 9-5/8" casing to 3000 psi for 30 minutes. A formation leak -off test will be performed when 20' of new hole has been drilled below the 9-5/8" shoe. Also, perform a well kill drill at this time. 5. Directionally drill 8-1/2" hole to 7" casing point at ±10216' MD/8996' TVD. Run 7" 26# L-80 BTC -MOD casing string and cement with Class G cement to 500' MD above the Ugnu. Test casing to 3,500 psi. The annulus will be freeze protected with dead crude oil. 6. Drill 20' of new 6" hole and test the formation to a minimum of 0.5 ppg over the mud weight to be used to drill the previous hole section. Displace mud system to QUICKDRILn mud system. Directionally drill high angle section with MWD/GR/Resistivity to TD at ±14082' MD/9022' TVD. 7. RIH with 4-1/2", 12.6#, L-80 solid x slotted liner, 4-1/2" ECP, 4-1/2" ES Cementer and 7" x 4-1/2" packer/hanger spaced out for a 150' lap. Cement liner in place with the total cement volume based on 40% excess in open hole, 150' lap and 40' shoe volume. Bump plug. Set and test liner hanger/packer with 3500 psi. 8. RIH with 3-3/4" bit to clean out cement in liner to TD. Displace to seawater. POOH. 9. RIH with 2-3/4" drillpipe conveyed perf guns and perforate 4-1/2" solid liner. POOH and lay down guns. 10. Set 7" x 4-1/2" permanent ML production packer (with 4-1/2" tubing tail) at ±9815' MD/8887' TVD (17' MD below the planned top of whipstock). 11. Set oriented, retrievable whipstock above permanent packer so the top of the whipstock window will be at ±9798' MD/8879' TVD. 12. Displace well to QUICKDRILn mud system used to drill lower lateral. Mill window off whipstock at ±9798' MD and drill 29' window/new hole. POOH. 13. RIH with 6" steerable assembly (MWD/GR/Resistivity). Finish kickoff and directionally drill in Sag River, drilling 6" horizontal hole to TD at ±14096' MD/8877' TVD. 14. Run and set a4-1/2", L-80 slotted liner. Top of liner will beat ±9820' MD/8888' TVD (10' below casing exit/base of whipstock). 15. RIH and pull retrievable whipstock. 16. Run 4-1/2", 12.6 # L-80 IBT-MOD tubing with SSSV, GLMs, and 7" packer assembly. Circulate around freeze protection fluid and corrosion inhibitor. Set packer and test tubing to 4,000 psi. 17. Set TWC and test to 1000 psi. ND BOPE. NU tree and test to 5000 psi. Pull TWC. Test tubing x casing annulus to 3500 psi for 30 minutes. Secure well. Release rig. S-43 / S-431-1 Permit Info Page 4 Drilling Hazards • Hydrocarbon -bearing zone in the Ugnu formation. • Losses have been encountered drilling the Kingak, Sag River/Shublik and Sadlerochit formations on S Pad. Be prepared for losses near any faults and formation interfaces between the Kingak, Sag River/Shublik and Sadlerochit. • A minimum of 10.0 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi trip margin over the expected 9.4 ppg EMW @ 5000' TVDss. Disposal Cuttings Handling: Cuttings should be hauled to the ball mill at CC -2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC -2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cutting from drilling operations to CC - 2A for disposal, except the metal cuttings which will be sent to the North Slope Borough. S-43 / S-431_1 Permit Info Page 5 9-5/8" CASING CEMENT PROGRAM CASING SIZE: 9-5/8" CIRC. TEMP: 38°F FIRST STAGE CEMENT PREFLUSH: 75 bbis viscosified_fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET III (accounts for any variance in depth of ES cementer) ADDITIVES: retarder WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps APPROX. # SACKS: 120 THICKENING TIME: Greater than 4 hr. @ 50°F TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 +1 ghs FP -61 - WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx MIX WATER: 4.95 gps APPROX. # SACKS: 500 THICKENING TIME: Greater than 3-1/2 hr. @ 50°F SECOND STAGE CEMENT PREFLUSH: 75 bbis viscosified fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET III ADDITIVES: retarder - (Add 9 ppb Borax to first 30 bbis (90 sx) of Cold Set III lead cement in second stage) WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps APPROX. # SACKS: ±1865 THICKENING TIME: Greater than 4 hr. @ 50°F TOP JOB CEMENT TYPE: COLD SET 11 (if necessary) ADDITIVES: WEIGHT: 14.5 ppg YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps APPROX. # SACKS: 250 THICKENING TIME: Greater than 2 hr. @ 50°F RECEIVED CENTRALIZER PLACEMENT: M 474 14 1997 1. Run one (1) bow spring centralizer per joint for the first 15 joints. CEMENT VOLUME: Alulm Oil & Gas Cons. Ganmiso � ., . 1. Lead slurry volumes estimated: ��mg a. Base of Permafrost to Conductor shoe with 400% excess b. Conductor x Surface Casing annulus (80' MD) c. Cement in surface casing to the ES Cementer at 1800' MD NOTE: With the two stage job, the actual lead cement volumes will be determined by the amount of cement necessary to get lead cement to surface. 2. Tail slurry volume from surface casing shoe to Base Permafrost with 30% excess plus the 80' shoe volume 3. Top job volume 250 sx (if necessary) S-43 / S-431-1 Permit Info Page 6 7" CASING CEMENT PROGRAM CASING SIZE: 7" CIRC. TEMP: 140°F PREFLUSH: 20 bbis fresh water SPACER: 50 bbls BJ MCS -4 Spacer weighted 1.0 ppg above mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 3% A-2 + 0.4% FL -52 + 0.5% CD -32 + 1 ghs FP -61 - WEIGHT: 11.0 ppg YIELD: 3.31 ft3/sx MIX WATER: 20.92 gps APPROX. # SACKS: 320 THICKENING TIME: 5 hrs FLUID LOSS: 150-250 cc/30 minutes FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL -52 + 0.5% CD -32 + 0.1 % A-2 + 1.0 ghs FP -61 - WEIGHT: 15.8 ppg YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps APPROX. # SACKS: 260 THICKENING TIME: 3-1/2 to 4-1/2 hrs FLUID LOSS: 100-150 cc/30 minutes FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Run 1 straight blade rigid centralizer per joint from TD to 500' MD above Sag River. 2. NO CENTRALIZERS TO BE PLACED ACROSS THE 3 STL JOINTS OF 7" CASING. 3. Run 1 straight blade rigid centralizer every joint 300' above and below the Ugnu. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the lead and tail slurries on the fly. CEMENT VOLUME: 1. Lead slurry to 3189' MD (500' above Ugnu) with 50% excess 2. Tail slurry to 8756' MD (1000' above Sag River) with 50% excess 3. 80' MD 7" 26# capacity for float joints. Note: Hydrocarbon bearing zones are identified in the Ugnu and Sag River intervals. S-43 / S-431-11 Permit Info Page 7 4-1/2" PRODUCTION LINER (LOWER LATERAL) SOLID X SLOTTED CEMENT PROGRAM CIRC. TEMP: 1400 F PREFLUSH: 20 bbls 2% KCI water BHST: 220° F at 8800' TVDss SPACER: 50 bbis BJ MCS -4 Spacer weighted 1.0 ppg above mud weight with 2% KCI CEMENT TYPE: CLASS G with 2% KCI ADDITIVES: 175 ghs BA -86L + 2% A-9 + 0.6% CD -32 + 0.3% FL -33 + 0.2% A-2 + 0.5% gel + 1 ghs FP -6L WEIGHT: 15.7 ppg YIELD: 1.19 ft3/sx MIX WATER: 3.43 gps APPROX. # SACKS: 225 THICKENING TIME: 45 min. @ Surface + 3-4 hr. @ 140°F FLUID LOSS: less than 50 cc/30 minutes @ 140°F FREE WATER: 0 cc at 450 angle. CENTRALIZER PLACEMENT: 1. Run 2 right hand turbolators per joint in open hole, 2. Run 1 right hand turbulator per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 50 cc/30 min. or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm. LINER CEMENT VOLUME: 1. Open hole (6" X 4-1/2") + 40% excess (adjust if a caliper log is run and it indicates severe washouts). 2. 4-1/2", 12.6# casing capacity below landing collar (80'). 3. 150' liner lap 4-1/2" PRODUCTION LINER (UPPER LATERAL) No cement necessary - slotted liner. S-43 / S-431-1 Permit Info Page 8 Section Departure Anadrill (c)97 543LIP12 3.00 3:03 PM P) SHARED SERVICES DRILLING Anadrlll schlumberger S -43L I (P 12) VERTICAL SECTION VIEW Section at: 12.63 7000 TVD Scale.: 1 inch = 500 feet Dep Scale.: 1 inch = 500 feet 7250 ) L - Drawn .....: It Mar 1997 APPROVED 7500 Marker Identification MD BKB SECTN INCLN N 1 L A) TOP OF WHIPSTOCK 9798 8879 916 65.00 B) BASE OF WHIPSTOCK 9810 8684 922 67.00 PiIG� C) KOP / CURVE 30/100 9827 8891 932 67.00 7750 D) END 30/100 CURVE 9929 8906 999 96.13 E) CURVE 10/100 10222 8874 1213 96.13 F) END 10/100 CURVE 10413 8667 1371 68.34 T 8000 G) TARGET START **xxxxx 10413 8667 1371 66.34 H) CURVE 6/100 11793 8907 2617 88.34 V I) END 6/100 CURVE 12617 8910 3415 91.28 D J) 4-3/4" LINER POINT 14096 8877 4766 91.26 8250 K) TD 14096 8877 4766 91.28 8500 8750• -SIG V( -- ------- 12111 ct_ inti _ ----- ---- --- — ---^— SHu6L E F 9000 b�AdU�'u C �w� �0 _____ _________________ - - - -- - - - - - -- __ _ -__=--=--= -- ______________ =__-= _-----__== ___'_ ---__ ----- _____ T73 _911T----- — — — —— ———— — — — — —— — — — — — — — — —— ———— — — — — —— — — — —— ———— — — — — —— — — — —— — — — —— ———— — — — — —— — — — —— — — — —— 9250 . 9500- 9750 10000 500 750 1000 1250 1500 1750 2000 2250 2500 2750 3000 3250 3500 3750 4000 4250 4500 4750 5000 Section Departure Anadrill (c)97 543LIP12 3.00 3:03 PM P) I anadrill Schlumberger I SHARED SERVICES DRILLING I S-43LI W12) PLAN VIEWZ CLOSURE.....: 5801 feet at Azimuth 47.38 — 4400 DECLINATION.: +28.337 (E) SCALE .......: 1 inch = 800 feet DRAWN .......: 11 Mar 1997 4000 N �VG Marker Identification MD N/S E/W — — + 3600 A) TOP OF WHIPSTOCK 9798 258 N 3038 E ' B) BASE OF WHIPSTOCK 9810 262 N 3048 E C) KOP / CURVE 30/100 9827 269 N 3062 E ' D) END 30/100 CURVE 9929 319 N 3148 E 3200 E) CURVE 10/100 10222 464 N 3389 E F) END 10/100 CURVE 10413 614 N 3528 E ' G) TARGET START ******* 10413 614 N 3528 E H) CURVE 6/100 11793 1701 N 4376 E -- 2800 I) END 6/100 CURVE 12617 2478 N 4560 E , J) 4-3/4" LINER POINT 14096 3928 N 4268 E K) TO 14096 3928 N 4268 E I 2400 2000 Tu Poin (Point) H 1600 -- 1200 Tar t Star (Point) 800 -- - - 400 = Q 0 Z -- ----0 KB-- -- 0 400 400 0 400 800 1200 1600 2000 2400 2800 3200 3600 4000 4400 .4800 5200 5600 6000 6400 6800 <- WEST : EAST -> Anadrill M97 S43LIP12 3.00 3;06 PM P) Anadrill Schlumberger Alaska District . 1111 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well.........: S -43L1 (P12) Field......... Prudhoe Bay, S -Pad Computation..: Minimum Curvature Units......... FEET Surface Lat..: 70.35514443 N Surface Long.: 149.03417336 W LOCATIONS - ALASKA Zone: 4 Legal Description X-Coord Y-Coord Surface......: 4211 FSL 4503 FEL S35 T12N R12E UM 618929.89 5980414.71 Top of Whpstk: 4468 FSL 1464 FEL S35 T12N R12E UM 621963.21 5980720.68 Target Start.: 4824 FSL 974 FEL S35 T12N R12E UM 622447.00 5981085.00 Turn Point...: 631 FSL 124 FEL S26 T12N R12E UM 623278.00 5982185.00 BHL.\.TGT End: 2858 FSL 229 FEL S26 T12N R12E UM 623135.00 5984410.00 PROPOSED WELL PROFILE Prepared.....: 11 Mar 1997 Vert sect ax.: 12.63 KB elevation.: 66..90 ft Magnetic Dcln: +28.337 (E) Scale Factor.: 0.99991607 Convergence..: +0.90962002 ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY PLAN # STATION MEASURED INCLN DIRECTION VERTICAL -DEPTHS SECTION COORDINATES -FROM ALASKA Zone 4 TOOL DL/ IDENTIFICATION DEPTH ANGLE AZIMUTH TVD SUB -SEA DEPART WELLHEAD X Y FACE 100 cxaasaasxamsssssaaa: SAG RIVER aao3xaas asaaca xax=xaamm aaaamass 8861.90 axaaxasa 8795.00 mxsaaa:a xsmaaassxa sa3asamsas ..rims... oaaassaaxs assn rima TOP OF WHIPSTOCK 9797.72 65.00 65.00 8879.40 8812.50 915.70 257.80 N 3038.05 E 621963.21 5980720.68 HS 9800.00 65.38 65.00 8880.36 8813.46 916.96 258.67 N 3039.93 E 621965.08 5980721.58 HS 16.67 BASE OF WHIPSTOCK 9809.72 67.00 65.00 8884.28 8817.38 922.39 262.43 N 3047.98 E 621973.07 5980725.47 HS 16.67 KOP / CURVE 30/100 9826.72 67.00 65.00 8890.92 8824.02 931.94 269.04 N 3062.17 E 621987.14 5980732.31 19L 0.00 9850.00 73.63 62.66 8898.76 8831.86 945.68 278.71 N 3081.83 E 622006.65 5980742.29 18L 30.00 SHUBLIK 9862.45 77.19 61.48 8901.90 8835.00 953.51 284.36 N 3092.47 E 622017.20 5980748.10 18L 30.00 9875.00 80.77 60.32 8904.30 8837.40 961.71 290.35 N 3103.23 E 622027.86 5980754.26 17L 30.00 9900.00 87.93 58.07 8906.76 8839.86 978.80 303.08 N 3124.58 E 622049.01 5980767.33 17L 30.00 9925.00 95.10 55.85 8906.10 8839.20 996.66 316.70 N 3145.52 E 622069.72 5980781.27 17L 30.00 END 30/100 CURVE 9928.61 96.13 55.52 8905.74 8838.84 999.29 318.72 N 3148.49 E 622072.66 5980783.35 HS 30.00 (Anadrill (c)97 S43L1P12 3.00 2:42 PM P) S -43L1 (P12) PROPOSED WELL PROFILE 11 Mar 1997 Page 2 xxxxxxxx=xxxxxxxxxxx STATION _=xxxx=x MEASURED xxxxxs INCLN xaxaxxsxxx DIRECTION aaacx socxxsmasaaass VERTICAL -DEPTHS sassmmmm SECTION ss:xcasaaxs¢amaassasa COORDINATES -FROM smasm.x msasammsmamsma ALASKA Zone 4 axaa TOOL asas DL/ IDENTIFICATION DEPTH ANGLE AZIMUTH TVD SUS -SEA DEPART WELLHEAD X Y FACE 100 CURVE 10/100 ===­.= 10221.76 9 6 x x S x 96.13 ­­=­ 55.52 8874.43 8807.53 1212.82 483.71 N 3388.76 E 622310.26 a a a maa qs m in a 5980952.11 a m a in 113L -..a 0.00 10300.00 92.98 48.34 8868.21 8801.31 1273.13 531.78 N 3450.11 E 622370.84 5981001.14 114L 10.00 10400.00 88.89 39.21 8866.57 8799.67 1358.59 603.89 N 3519.19 E 622438.76 5981074.33 114L 10.00 END 10/100 CURVE 10413.49 88.34 37.98 8866.90 8800.00 1370.71 614.42 N 3527.60 E 622447.00 5981085.00 HS 10.00 TARGET START ******* 10413.49 88.34 37.98 8866.90 8800.00 1370.71 614.42 N 3527.60 E 622447.00 5981085.00 HS 10.00 CURVE 6/100 11792.79 88.34 37.98 8906.90 8840.00 2616.66 1701.18 N 4376.03E 623278.00 5982185.00 87L 0.00 11800.00 88.36 37.55 8907.11 8840.21 2623.19 1706.88 N 4380.45 E 623282.32 5982190.77 87L 6.00 11900.00 88.70 31.55 8909.68 8842.78 2715.88 1789.18 N 4437.11 E 623337.67 5982273.95 87L 6.00 12000.00 89.05 25.56 8911.65 8844.75 2811.98 1876.95 N 4484.89.E 623384.04 5982362.46 87L 6.00 12100.00 89.40 19.57 8913.00 8846.10 2910.42 1969.25 N 4523.25 E 623420.93 5982455.35 87L 6.00 12200.00 89.77 13.58 8913.72 8846.82 3010.14 2065.04 N 4551.76 E 623447.92 5982551.58 86L 6.00 12300.00 90.14 7.60 8913.80 8846.90 3110.03 2163.29 N 4570.13 E 623464.73 5982650.10 86L 6.00 12400.00 90.51 1.61 8913.24 8846.34 3209.00 2262.92 N 4578.15'E 623471.16 5982749.84 87L 6.00 12500.00 90.87 355.62 8912.04 8845.14 3305.97 2362.84 N 4575.73 E 623467.16 5982849.69 87L 6.00 12600.00 91.22 349.63 8910.22 8843.32 3399.88 2461.95 N 4562.90 E 623452.75 5982948.58 87L 6.00 END 6/100 CURVE 12616.51 91.28 348.64 8909.86 8842.96 3415.02 2478.16 N 4559.79 E 623449.38 5982964.73 HS 6.00 4-3/4" LINER POINT 14096.06 91.28 348.64 8876.90 8810.00 4766.43 3928.35 N 4268.36 E 623135.00 5984410.00 0.00 TD 14096.06 91.28 348.64 8876.90 8810.00 4766.43 3928.35 N 4268.36 E 623135.00 5984410.00 0.00 TSAD / TZ4B 8991.90 8925.00 TZ4A 9041.90 8975.00 TOP HEAVY OIL/TAR 9056.90 8990.00 ANA DRILL CURRENT OWC 9086.90 9020.00APPROVED pP AKA-DPC A TZ3 9161.90 9095.00 O V E D FOR PERMITTING ONLY PLAN', (Anadrill (c)97 S43L1P12 3.00 2:42 PM P) H 104187 VENDOR�I�=i 11 9 7= 1 1?97I I 1 I I � :i1 H I ERR I E HU--'-) L X 45-28 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. 1111111011 Ifelm Will' ' 1 WELL PERMIT CHECKLISTCOMPANY zt':2 WELL NAME � C5--' 5✓9 PROGRAM: exp❑ dev/-Mrredrl❑ serv❑ wellbore sex ann disp para req❑ FIELD & POOL g52 f� INIT CLASS new GEOL AREA 7� UNIT# '//�s�j ON/OFF SHORE �T1MTAITCTRnTT�1N HOW/dlf - A:IFORMSIcheklist rev 01197 Cil REMARKS 1. Permit fee attached . . . . . . . . . . . . . . . . . Y N 2. Lease number appropriate. . . . . . . . . . . . . . . Y N 3. Unique well name and number . . . . . . . . . . . . . . Y N 4. Well located in a defined pool. . . . . . . . . . . .Y N 5. Well located proper distance from drlg unit boundary. . .Y N 6. Well located proper distance from other wells. . . . . Y N 7. Sufficient acreage available in drilling unit. . . . . Y N 8. If deviated, is wellbore plat included . . . . . . . . Y N 9. Operator only affected party. . . . . . . . . . . . .Y N 10. Operator has appropriate bond in force. . . . . . . .Y N 11. Permit can be issued without conservation order. . . . Y N APPRATE 12. Permit can be issued without administrative approval. . .Y N �� 13. Can permit be approved before 15 -day wait.. . . . . . . Y N ENGINEERING 14. Conductor string provided . . . . . . . . . . . . . . . .Y N 15. Surface casing protects all known USDWs . . . . . . . . .Y N 16. CMT vol adequate to circulate on conductor & surf csg. . Y N 17. CMT vol adequate to tie-in long string to surf csg . . . Y N 18. CMT will cover all known productive horizons. . . . . . .Y OF 19. Casing designs adequate for C, T, B & permafrost. . . . N 20. Adequate tankage or reserve pit. . . . . . . . . . . . N 21. If a re -drill, has a 10-403 for abndmmnt been approved. i'l 22. Adequate wellbore separation proposed. . . . . . . . . . N 23. If diverter required, is it adequate. . . . . . . . . . /� A 24. Drilling fluid program schematic & equip list adequate N 25. BOPEs adequate . . . . . . . . . . . . . . . . . N APPR TE 26. 27. BOPS press rating adequate; test to psig. N / Choke manifold complies w/API RP -53 (May 84). . . . . N 28. Work will occur without operation shutdown. . . . . . . N 29. Is presence of H2S gas probable . . . . . . . . . . . . .Y N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures. .Y N 31. Data presented on potential overpressure zones . . . . . Y 32. Seismic analysis of shallow gas zones. . . . . . . . . . Y N 33. Seabed condition survey (if off -shore) . . . . . . . N APIP.R PATE/ 34. Contact name/Phone for weekly progress reports Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: . Comments/Instructions: LRPA BEW ���� DWJ JDH mcm P) ,��_ HOW/dlf - A:IFORMSIcheklist rev 01197 Cil Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ****************************** * * ALASKA COMPUTING CENTER ------------------------- ------- SCHLUMBERGER ---- ---------------------------- COMPANY NAME B.P. EXPLORATION WELL NAME 5-43 Ll FIELD NAME PRUDHOE BAY BOROUGH NORTH SLOPE STATE ALASKA API NUMBER 50-029-22754-60 REFERENCE NO 97548 J�71 Date RECEluty p ,.;EC 0 u 1997 j moorage LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 1 Schlumberger Alaska Computing Center **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/12/ 2 ORIGIN : FLIC REEL NAME : 97472 CONTINUATION # : PREVIOUS REEL . COMMENT : B.P. EXPLORATION, PRUDHOE BAY S-43 L1, API #50-029-22754-60 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/12/ 2 ORIGIN FLIC TAPE NAME 97472 CONTINUATION # 1 PREVIOUS TAPE COMMENT : B.P. EXPLORATION, PRUDHOE BAY S-43 L1, API #50-029-22754-60 TAPE HEADER 35 TOWNSHIP: PR UDHOE BAY RANGE: 12E MWD/MAD LOGS FSL: FEL: WELL NAME: S-43 Ll API NUMBER: KELLY BUSHING: 500292275460 OPERATOR: 66.60 B.P. EXPLORATION LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 29 -OCT -97 # JOB DATA BIT RUN 1 BIT RUN 2 BIT RUN 3 JOB NUMBER: --------- 97472 --------- --------- LOGGING ENGINEER: BROWN OPERATOR WITNESS: WHITELY SURFACE LOCATION SECTION: 35 TOWNSHIP: 12N RANGE: 12E FNL. FSL: FEL: FWL : ELEVATION(FT FROM MSL 0) KELLY BUSHING: 68.10 DERRICK FLOOR: 66.60 GROUND LEVEL: 37.20 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) ------------- --------- ---------- 1ST STRING 8.500 9.625 3121.0 2ND STRING 6.000 7.000 9760.0 f LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 2 Schlumberger Alaska Computing Center 3RD STRING PRODUCTION STRING REMARKS: Well drilled 10 -MAY through 17 -JUN -97 with CDR and ARC5 in 9 bit runs. The CDR was used on runs 1,2 and the ARC5 was used on runs 3 to 9. No depth shifts were applied to this data as per Troy Weiss. The PSR in the edited file is a merge of the CDR PSR and the ARC5 P28H data to provide a continuous log. **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE FLIC VERSION 001C01 DATE 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE LO LAST FILE FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 ff FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 8410.5 14061.0 BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) ----------EQUIVALENT UNSHIFTED DEPTH ---------- BASELINE DEPTH MWD -------------- ------- MERGED DATA SOURCE LDWG TOOL CODE BIT RUN NO. MERGE TOP MERGE BASE --------------------------------------------- AffVD 1 8410.5 10691.0 MWD 2 9420.0 11993.0 MWD 3 9870.0 12624.0 MWD 4 9970.0 12815.0 MWD 5 10335.0 10767.0 MWD 6 10691.0 12069.0 14WD 7 11993.0 12705.0 MWD 8 12624.0 12888.0 MWD 9 12815.0 14061.0 LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 3 Schlumberger Alaska Computing Center M REMARKS: No depth adjustments were made to this data as per Troy Weiss of BP. This file contains the data from the CDR run on runs 1, 2 and the ARCS data run on runs 3 to 9. The ARCS data includes both phase shift (PxxH) and attenuation (AxxH) data. The ARCS data uses LDWG mnemonics as per Dave Douglas. The RP channel is a merge of the CDR PSR and the ARCS P28H to provide a continuous log as per Dave Douglas. LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64BB ** ----------------------------- TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 0 SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 1 1 1 4 68 0000000000 ROP MWD F/HR 00 000 00 0 1 1 1 4 68 0000000000 FET MWD HR 00 000 00 0 1 1 1 4 68 0000000000 GR MWD GAPI 00 000 00 0 1 1 1 4 68 0000000000 RP MWD O= 00 000 00 0 1 1 1 4 68 0000000000 RA MWD OHMM 00 000 00 0 1 1 1 4 68 0000000000 RPXX MWD OHMM 00 000 00 0 1 1 1 4 68 0000000000 RPX MWD OHMM 00 000 00 0 1 1 1 4 68 0000000000 RPS MWD OHMM 00 000 00 0 1 1 1 4 68 0000000000 RPM MWD OHMM 00 000 00 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing 2 -DEC -1997 17:09 Schlumberger Alaska Computing Center PAGE: 4 --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- RPD MWD OHMM 00 000 00 0 1 1 1 4 68 0000000000 RAXX MWD ORM4 00 000 00 0 1 1 1 4 68 0000000000 RAX MWD OHMM 00 000 00 0 1 1 1 4 68 0000000000 RAS MWD O1-IM11 00 000 00 0 1 1 1 4 68 0000000000 RAM MWD OHMV 00 000 00 0 1 1 1 4 68 0000000000 RAD MWD --------------------------------------------------------------------------------------- OHMM 00 000 00 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 14061.000 ROP.MWD 37.040 FET.MWD -999.250 GR.MWD -999.250 RP.MWD -999.250 RA.MWD -999.250 RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD -999.250 RPD.MWD -999.250 RAXX.MWD -999.250 RAX.MWD -999.250 RAS.MWD -999.250 RAM.MWD -999.250 RAD.MWD -999.250 DEPT. 14000.000 ROP.MWD 32.970 FET.MWD -999.250 GR.MWD -999.250 RP.MWD -999.250 RA.MWD -999.250 RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD -999.250 RPD.MWD -999.250 RAXX.MWD -999.250 RAX.MWD -999.250 RAS.MWD -999.250 RAM.MWD -999.250 RAD.MWD -999.250 DEPT. 13000.000 ROP.MWD 50.990 FET.MWD 2.727 GR.MWD 54.437 RP.MWD 14.584 RA.MWD -999.250 RPXX.MWD 10.238 RPX.MWD 11.361 RPS.MWD 13.221 RPM.MWD 14.584 RPD.MWD 14.330 RAXX.MWD 11.467 RAX.MWD 11.702 RAS.MWD 12.453 RAM.MWD 12.822 RAD.MWD 12.544 DEPT. 12000.000 ROP.MWD 50.140 FET.MWD 0.630 GR.MWD 52.377 RP.MWD 14.522 RA.MWD -999.250 RPXX.MWD 11.150 RPX.MWD 11.693 RPS.MWD 13.255 RPM.MWD 14.522 RPD.MWD 14.160 RAXX.MWD 9.207 RAX.MWD 10.671 RAS.MWD 11.681 RAM.MWD 11.809 RAD.MWD 11.433 DEPT. 11000.000 ROP.MWD 42.060 FET.MWD 2.244 GR.MWD 52.804 RP.MWD 7.369 RA.MWD -999.250 RPXX.MWD 6.399 RPX.MWD 6.438 RPS.MWD 6.927 RPM.MWD 7.369 RPD.MWD 7.290 RAXX.MWD 6.097 RAX.MWD 6.752 RAS.MWD 7.178 RAM.MWD 7.272 RAD.MWD 7.113 DEPT. 10000.000 ROP.MWD 8.360 FET.MWD 1.491 GR.MWD 393.420 RP.MWD 72.650 RA.MWD -999.250 RPXX.MWD 18.679 RPX.MWD 29.616 RPS.MWD 48.547 RPM.MWD 72.650 RPD.MWD 87.800 RAXX.MWD 13.627 RAX.MWD 22.272 RAS.MWD 30.874 RAM.MWD 38.174 RAD.MWD 40.290 DEPT. 9000.000 ROP.MWD 31.310 FET.MWD -999.250 GR.MWD 109.030 RP.MWD 3.793 RA.MWD 2.825 RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD -999.250 RPD.MWD -999.250 RAXX.MWD -999.250 RAX.MWD -999.250 RAS.MWD -999.250 RAM.MWD -999.250 RAD.MWD -999.250 DEPT. 8411.000 ROP.MWD -999.250 FET.MWD -999.250 GR.MWD 116.066 RP.MWD -999.250 RA.MWD -999.250 RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD -999.250 RPD.MWD -999.250 RAXX.MWD -999.250 RAX.MWD -999.250 RAS.MWD -999.250 RAM.MWD -999.250 RAD.MWD -999.250 LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 5 Schlumberger Alaska Computing Center ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : OOIC01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : OO1C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH -------------- ----------- ---------- MAD 9770.0 9873.0 MERGED DATA SOURCE LDWG TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE -------------------------------------------------------- REMARKS: This data is from the down MAD pass run on bit run 3. The data is clipped. $ LIS FORMAT DATA LIS Tape Verification Listing 2 -DEC -1997 17:09 Schlumberger Alaska Computing Center ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB PAGE: 6 ** DATA ** DEPT. 9873.000 TYPE REPR CODE RPX.MAD -999.250 RPS.MAD -999.250 RPM.MAD -999.250 VALUE RAXX.MAD -999.250 RAX.MAD -999.250 RAS.MAD -999.250 RAM.MAD -999.250 RAD.MAD -999.250 ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 1 SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 2 1 1 4 68 0000000000 ROP MAD F/HR 00 000 00 0 2 1 1 4 68 0000000000 FET MAD HR 00 000 00 0 2 1 1 4 68 0000000000 GR MAD GAPI 00 000 00 0 2 1 1 4 68 0000000000 RPXX MAD 01Hviff 00 000 00 0 2 1 1 4 68 0000000000 RPX MAD OHW4 00 000 00 0 2 1 1 4 68 0000000000 RPS MAD OHMM 00 000 00 0 2 1 1 4 68 0000000000 RPM MAD OH1f1 00 000 00 0 2 1 1 4 68 0000000000 RPD MAD OHMRT 00 000 00 0 2 1 1 4 68 0000000000 RAXX MAD O= 00 000 00 0 2 1 1 4 68 0000000000 RAX MAD O= 00 000 00 0 2 1 1 4 68 0000000000 RAS MAD O= 00 000 00 0 2 1 1 4 68 0000000000 RAM MAD 01HOT 00 000 00 0 2 1 1 4 68 0000000000 RAD MAD --------------------------------------------------------------------------------------- OHWT 00 000 00 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9873.000 ROP.MAD 153.850 FET.MAD -999.250 GR.MAD -999.250 RPXX.MAD -999.250 RPX.MAD -999.250 RPS.MAD -999.250 RPM.MAD -999.250 RPD.MAD -999.250 RAXX.MAD -999.250 RAX.MAD -999.250 RAS.MAD -999.250 RAM.MAD -999.250 RAD.MAD -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center DEPT. 9770.000 ROP.MAD RPXX.MAD 5.696 RPX.MAD RPD.MAD 8.000 RAXX.MAD RAM.MAD 3.896 RAD.MAD END OF DATA **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : OO1C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : OO1C01 DATE : 97/12/ 2 MAX REC SIZE 1024 FILE TYPE : LO LAST FILE 2 -DEC -1997 17:09 88.680 FET.MAD 6.093 RPS. MAD 1.389 RAX.MAD 4.777 PAGE: 7 0.258 GR.MAD 105.299 7.230 RPM.MAD 8.223 2.156 RAS.MAD 3.002 FILE HEADER FILE NUMBER: 3 EDITED MAD PASSES Depth shifted and clipped curves; for each pass of each run in separate files. MAD RUN NUMBER: 1 MAD PASS NUMBER. 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH -------------- ----------- ---------- MAD 9770.0 9873.0 BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) ----------EQUIVALENT UNSHIFTED DEPTH ---------- BASELINE DEPTH MAD -------------- ------- REMARKS: This data is from the down MAD pass run on bit run 3. The data is clipped. LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 8 Schlumberger Alaska Computing Center LIS FORMAT DATA DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** * * DATA * * TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 1 SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 3 1 1 4 68 0000000000 ROP MAD F/HR 00 000 00 0 3 1 1 4 68 0000000000 FET MAD HR 00 000 00 0 3 1 1 4 68 0000000000 GR MAD GAPI 00 000 00 0 3 1 1 4 68 0000000000 RPXX MAD OHMD1 00 000 00 0 3 1 1 4 68 0000000000 RPX MAD OHMM 00 000 00 0 3 1 1 4 68 0000000000 RPS MAD OIHVM 00 000 00 0 3 1 1 4 68 0000000000 RPM MAD OHMV 00 000 00 0 3 1 1 4 68 0000000000 RPD MAD OH1v1M 00 000 00 0 3 1 1 4 68 0000000000 RAXX MAD OHMM 00 000 00 0 3 1 1 4 68 0000000000 RAX MAD OHMM 00 000 00 0 3 1 1 4 68 0000000000 RAS MAD OHMM 00 000 00 0 3 1 1 4 68 0000000000 RAM MAD OHMM 00 000 00 0 3 1 1 4 68 0000000000 RAD --------------------------------------------------------------------------------------- MAD OHPw 00 000 00 0 3 1 1 4 68 0000000000 * * DATA * * LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 9 Schlumberger Alaska Computing Center VERSION : OO1C01 DEPT. 9873.000 ROP.MAD 153.850 FET.MAD -999.250 GR.MAD -999.250 RPXX.MAD -999.250 RPX.MAD -999.250 RPS.MAD -999.250 RPM.MAD -999.250 RPD.MAD -999.250 RAXX.MAD -999.250 RAX.MAD -999.250 RAS.MAD -999.250 RAM.NIAD -999.250 RAD.MAD -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : OO1C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREN NT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ---------------- ----------- MWD 8411.0 ---------- 9459.0 # LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION: S.OB DATA TYPE (TJF- ORY or REAL-TIME) : MEMORY TD DRILLER (FT) : 14061.0 TOP LOG INTERVAL (FT) : 8410.5 BOTTOM LOG INTERVAL (FT): 14061.0 { LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 10 Schlumberger Alaska Computing Center BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ---------------- --------- CDR RESIST./GR ----------- CDR -7027 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT) : 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE MUD FILTRATE AT (MT) : 0.045 155.0 MUD CAKE AT (MT) NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN ON RUNS 1,2 ARC5 RUN ON RUNS 3 - 9 HOLE ANGLE AT TD = 97.8 DEG @ 14061' CDR RUN IN 8.5" HOLE ARCS RUN IN 6" HOLE WELL IS LATERAL OF 5-43 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE LIS FORMAT DATA LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 11 Schlumberger Alaska Computing Center ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 ------------------------------ 1 SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 4 1 1 4 68 0000000000 ROP5 LWI F/HR 00 000 00 0 4 1 1 4 68 0000000000 GR LWI GAPI 00 000 00 0 4 1 1 4 68 0000000000 PSR LWI OHMM 00 000 00 0 4 1 1 4 68 0000000000 ATR LWI --------------------------------------------------------------------------------------- OHMM 00 000 00 0 4 1 1 4 68 0000000000 * * DATA * * DEPT. 9459.000 ROP5.LW1 14.350 GR.LW1 -999.250 PSR.LW1 -999.250 ATR.LW1 -999.250 DEPT. 9000.000 ROP5.LW1 31.310 GR.LW1 109.030 PSR.LW1 3.793 ATR.LW1 2.825 DEPT. 8410.500 ROP5.LW1 -999.250 GR.LW1 115.206 PSR.LW1 1.174 ATR.LW1 1.251 ** END OF DATA ** LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 12 Schlumberger Alaska Computing Center **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT): **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT): FILE HEADER FILE NUMBER 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: 0.5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ------------------------------------- PfffD 9420.0 9770.0 LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION: 5.0B DATA TYPE (MEMORY or REAL-TIME) : MEMORY TD DRILLER (FT) : 14061. 0 TOP LOG INTERVAL (FT) : 8410.5 BOTTOM LOG INTERVAL (FT): 14061.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE. 45.0 MAXIMUM ANGLE: 61.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ---------------- --------- CDR RESIST./GR ----------- CDR -7027 LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 13 Schlumberger Alaska Computing Center BOREHOLE AND CASING DATA 66 OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 3 73 BOREHOLE CONDITIONS 4 MUD TYPE. QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): 6 MUD PH: MUD CHLORIDES (PPM) 65 FLUID LOSS (C3): 8 RESISTIVITY (OHM) AT TEMPERATURE (DEGF): 0.5 MUD AT MEASURED TEMPERATURE (MT): 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE MUD FILTRATE AT (MT): 0.045 155.0 MUD CAKE AT (MT) NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (-IN): EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN ON RUNS 1,2 ARCS RUN ON RUNS 3 - 9 HOLE ANGLE AT TD = 97.8 DEG @ 14061' CDR RUN IN 8.5" HOLE ARC5 RUN IN 6" HOLE WELL IS LATERAL OF 5-43 MAD PASS DATA COLLECTED (ARC5 ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** ----------------------------- TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 14 Schlumberger Alaska Computing Center ---------------------------- TYPE REPR CODE VALUE 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ------------------------------ SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 5 1 1 4 68 0000000000 ROPS LW2 F/HR 00 000 00 0 5 1 1 4 68 0000000000 GR LW2 GAPI 00 000 00 0 5 1 1 4 68 0000000000 PSR LW2 OHM4 00 000 00 0 5 1 1 4 68 0000000000 ATR LW2 OlvqM 00 000 00 0 5 1 1 4 68 0000000000 --------------------------------------------------------------------------------------- * * DATA * * DEPT. 9770.000 ROP5.LW2 88.680 GR.LW2 109.239 PSR.LW2 9.009 ATR. LW2 8.192 DEPT. 9420.000 ROP5.LW2 -999.250 GR.LW2 130.600 PSR.LW2 -999.250 ATR.LW2 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE 1024 FILE TYPE : LO LAST FILE 2 -DEC -1997 17:09 FILE HEADER FILE NUMBER 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: 0.5000 u FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ---------------- ----------- ---------- MWD 9870.0 10043.0 # LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: VS R24 DOWNHOLE SOFTWARE VERSION: 5.OB DATA TYPE (MEMORY or REAL-TIME): MEMORY TD DRILLER (FT) : 14061.0 TOP LOG INTERVAL (FT) . 8410.5 BOTTOM LOG INTERVAL (FT) : 14061.0 BIT ROTATING SPEED (RPM) HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ---------------- --------- ARCS RESIST./GR ----------- ARC5-063 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 # BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): PAGE: 15 LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 16 Schlumberger Alaska Computing Center FLUID LOSS (C3) : RESISTIVITY (ORM AT TEMPERATURE (DEGF) 64EB ** MUD AT MEASURED TEMPERATURE (MT): 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE VALUE MUD FILTRATE AT (MT) : 0.045 155.0 MUD CAKE AT (MT) 2 # 0 NEUTRON TOOL 73 MATRIX: 4 MATRIX DENSITY: 1 HOLE CORRECTION (IN): 66 6 TOOL STANDOFF (IN) EWR FREQUENCY (HZ) : 20000 8 REMARKS: CDR RUN ON RUNS 1,2 0.5 ARCS RUN ON RUNS 3 - 9 65 HOLE ANGLE AT TD = 97.8 DEG Ca 14061' 11 CDR RUN IN 8.5" HOLE 18 ARC5 RUN IN 6" HOLE 68 WELL IS LATERAL OF 5-43 13 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE 65 FT 15 66 68 LIS FORMAT DATA 66 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 1 LIS Tape Verifica-,on Listing 2 -DEC -1997 17:09 PAGE: 17 Schlumberger Alaska Computing Center ** SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 6 1 1 4 68 0000000000 ROP5 LW3 FIHR 00 000 00 0 6 1 1 4 68 0000000000 TABR LW3 HR 00 000 00 0 6 1 1 4 68 0000000000 GR LW3 GAPI 00 000 00 0 6 1 1 4 68 0000000000 P10H LW3 01941 00 000 00 0 6 1 1 4 68 0000000000 P16H LW3 OHIM�1 00 000 00 0 6 1 1 4 68 0000000000 P22H LW3 ORMN 00 000 00 0 6 1 1 4 68 0000000000 P28H LW3 OHMM 00 000 00 0 6 1 1 4 68 0000000000 P34H LW3 OHMN1 00 000 00 0 6 1 1 4 68 0000000000 A10H LW3 OHM4 00 000 00 0 6 1 1 4 68 0000000000 Al 6H LW3 OHMM 00 000 00 0 6 1 1 4 68 0000000000 A22H LW3 ORM 00 000 00 0 6 1 1 4 68 0000000000 A28H LW3 01941 00 000 00 0 6 1 1 4 68 0000000000 A34H LW3 OHMM 00 000 00 0 6 1 1 4 68 0000000000 --------------------------------------------------------------------------------------- * * DATA * * DEPT. 10043.000 ROP5.LW3 72.870 TABR.LW3 -999.250 GR.LW3 -999.250 P10H.LW3 -999.250 P16H.LW3 -999.250 P22H.LW3 -999.250 P28H.LW3 -999.250 P34H.LW3 -999.250 A10H.LW3 -999.250 A16H.LW3 -999.250 A22H.LW3 -999.250 A28H.LW3 -999.250 A34H.LW3 -999.250 DEPT. 10000.000 ROP5.LW3 8.360 TABR.LW3 -999.250 GR.LW3 -999.250 P10H.LW3 -999.250 P16H.LW3 -999.250 P22H.LW3 -999.250 P28H.LW3 -999.250 P34H.LW3 -999.250 A10H.LW3 -999.250 A16H.LW3 -999.250 A22H.LW3 -999.250 A28H.Lf%T3 -999.250 A34H.LW3 -999.250 DEPT. 9870.000 ROP5.LW3 233.770 TABR.LW3 4.690 GR.LW3 86.403 P10H.LW3 60.565 P16H.LW3 73.891 P22H.LW3 128.512 P28H.LW3 196.759 P34H.LW3 150.080 A10H.LW3 39.411 A16H.LW3 300.000 A22H.LW3 300.000 A28H.LW3 300.000 A34H.LW3 295.953 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : OO1col DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 18 Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : 001c01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT): FILE HEADER FILE NUMBER 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SNOTARY VENDOR TOOL CODE START DEPTH STOP DEPTH ---------------- ----------- ---------- MWD 9970.0 10414.0 LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION. V5 R24 DOWNHOLE SOFTWARE VERSION: 5.OB DATA TYPE (MEMORY or REAL-TIME) : MEMORY TD DRILLER (FT) : 14061.0 TOP LOG INTERVAL (FT): 8410.5 BOTTOM LOG INTERVAL (FT): 14061.0 BIT ROTATING SPEED (RPM) . HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ------------------------- ARC5 RESIST./GR ----------- ARC5-063 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): ice.. LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 19 Schlumberger Alaska Computing Center FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE MUD FILTRATE AT (MT): 0.045 155.0 MUD CAKE AT (MT) : NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN ON RUNS 1,2 ARCS RUN ON RUNS 3 - 9 HOLE ANGLE AT TD = 97.8 DEG Ca 14061' CDR RUN IN 8.5" HOLE ARCS RUN IN 6" HOLE WELL IS LATERAL OF 5-43 MAD PASS DATA COLLECTED (ARC5 ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64 -EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 1 LIS Tape Verifica,ion Listing 2 -DEC -1997 17:09 PAGE: 20 Schlumberger Alaska Computing Center DATA DEPT. ** SET TYPE - CHAN ** ROP5.LW4 80.360 TABR.LW4 -999.250 GR.LW4 -999.250 P10H.LW4 -999.250 P16H.LW4 --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE -999.250 CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 7 1 1 4 68 0000000000 ROP5 LW4 F/11R 00 000 00 0 7 1 1 4 68 0000000000 TABR LW4 HR 00 000 00 0 7 1 1 4 68 0000000000 GR LW4 GAPI 00 000 00 0 7 1 1 4 68 0000000000 P10H LW4 0194M 00 000 00 0 7 1 1 4 68 0000000000 P16H LW4 OHMM 00 000 00 0 7 1 1 4 68 0000000000 P22H LW4 OHMV 00 000 00 0 7 1 1 4 68 0000000000 P28H LW4 0194M 00 000 00 0 7 1 1 4 68 0000000000 P34H LW4 OHMM 00 000 00 0 7 1 1 4 68 0000000000 A10H LW4 Offi4l 00 000 00 0 7 1 1 4 66 0000000000 A16H LW4 OHWT 00 000 00 0 7 1 1 4 68 0000000000 A22H LW4 ORMN 00 000 00 0 7 1 1 4 68 0000000000 A28H LW4 0194M 00 000 00 0 7 1 1 4 68 0000000000 A34H LW4 --------------------------------------------------------------------------------------- Oftel 00 000 00 0 7 1 1 4 68 0000000000 DATA DEPT. 10414.000 ROP5.LW4 80.360 TABR.LW4 -999.250 GR.LW4 -999.250 P10H.LW4 -999.250 P16H.LW4 -999.250 P22H.LW4 -999.250 P28H.LW4 -999.250 P34H.LW4 -999.250 A10H.LW4 -999.250 A16H.LW4 -999.250 A22H.LW4 -999.250 A28H.LW4 -999.250 A34H.LW4 -999.250 DEPT. 10000.000 ROP5.LW4 -999.250 TABR.LW4 1.491 GR.LW4 393.420 P10H.LW4 18.679 P16H.LW4 29.616 P22H.LW4 48.547 P28H.LW4 72.650 P34H.LW4 87.800 A10H.LW4 13.627 A16H.LW4 22.272 A22H.LW4 30.874 A28H.LW4 38.174 A34H.LW4 40.290 DEPT. 9970.000 ROP5.LW4 -999.250 TABR.LW4 -999.250 GR.LW4 56.717 P10H.LW4 -999.250 P16H.LW4 -999.250 P22H.LW4 -999.250 P28H.LW4 -999.250 P34H.LW4 -999.250 A10H.LW4 -999.250 A16H.LW4 -999.250 A22H.LW4 -999.250 A28H.LW4 -999.250 A34H.LW4 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME EDIT .007 SERVICE FLIC VERSION 001C01 DATE 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 21 Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT) : FILE HEADER FILE NUMBER 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: 0.5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ---------------- ----------- ---------- MWD 10335.0 10767.0 LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION: 5.OB DATA TYPE (MEMORY or REAL-TIME): MEMORY TD DRILLER (FT) : 14061.0 TOP LOG INTERVAL (FT): 8410.5 BOTTOM LOG INTERVAL (FT) : 14061.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ------------------------- ARC5 RESIST./GR ----------- ARC5-063 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : LIS Tape Verifica—Lon Listing 2 -DEC -1997 17:09 PAGE: 22 Schlumberger Alaska Computing Center FLUID LOSS (C3); RESISTIVITY (OM4N) AT TEMPERATURE (DEGF) - 64BB ** MUD AT MEASURED TEMPERATURE (MT): 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE VALUE MUD FILTRATE AT (MT): 0.045 155.0 MUD CAKE AT (MT) : 2 66 0 NEUTRON TOOL 73 MATRIX: 4 MATRIX DENSITY: 1 HOLE CORRECTION (IN): 66 6 TOOL STANDOFF (IN) : EWR FREQUENCY (N_Z) : 20000 8 REMARKS: CDR RUN ON RUNS 1,2 0.5 ARCS RUN ON RUNS 3 - 9 65 HOLE ANGLE AT TD = 97.8 DEG @ 14061' 11 CDR RUN IN 8.5" HOLE 18 ARCS RUN IN 6" HOLE 68 WELL IS LATERAL OF 5-43 13 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, VS.OB SOFTWARE 65 FT # 66 LIS FORMAT DATA 16 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64BB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 1 LIS Tape Verifica,,on Listing 2 -DEC -1997 17:09 Schlumberger Alaska Computing Center PAGE: 23 * * DATA * * DEPT. ** SET TYPE - CHAN ** ROP5.LW5 54.880 TABR.LW5 P10H.LW5 -999.250 P16H.LW5 -999.250 P22H.LW5 --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM P34H.LW5 CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 8 1 1 4 68 0000000000 ROPS LW5 F/HR 00 000 00 0 8 1 1 4 68 0000000000 TABR LW5 HR 00 000 00 0 8 1 1 4 68 0000000000 GR LWS GAPI 00 000 00 0 8 1 1 4 68 0000000000 P10H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 P16H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 P22H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 P28H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 P34H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 A10H LW5 0124M 00 000 00 0 8 1 1 4 68 0000000000 A16H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 A22H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 A28H LW5 OHMM 00 000 00 0 8 1 1 4 68 0000000000 A34H LW5 --------------------------------------------------------------------------------------- OHMM 00 000 00 0 8 1 1 4 68 0000000000 * * DATA * * DEPT. 10767.000 ROP5.LW5 54.880 TABR.LW5 P10H.LW5 -999.250 P16H.LW5 -999.250 P22H.LW5 P34H.LW5 -999.250 A10H.LW5 -999.250 A16H.LW5 A28H.LW5 -999.250 A34H.LW5 -999.250 DEPT. 10335.000 ROP5.LW5 -999.250 TABR.LWS P10H.LW5 -999.250 P16H.LW5 -999.250 P22H.LW5 P34H.LW5 -999.250 A10H.LW5 -999.250 A16H.LW5 A28H.LW5 -999.250 A34H.LW5 -999.250 * * END OF DATA * * **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION 001C01 DATE 97/12/ 2 MAX REC SIZE 1024 FILE TYPE LO LAST FILE -999.250 -999.250 GR.LWS -999.250 -999.250 P28H.LW5 -999.250 -999.250 A22H.Lb95 -999.250 -999.250 GR.LWS 59.700 -999.250 P28H.LW5 -999.250 -999.250 A22H.LW5 -999.250 LIS Tape Verifica—Lon Listing 2 -DEC -1997 17:09 PAGE: 24 Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT) : FILE HEADER FILE NUMBER 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ---------------- ----------- ---------- MWD 10691.0 12069.0 LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION: S.OB DATA TYPE (MEMORY or REAL-TIME) : MEMORY TD DRILLER (FT) : 14061.0 TOP LOG INTERVAL (FT). 8410.5 BOTTOM LOG INTERVAL (FT) : 14061.0 BIT ROTATING SPEED (RPM) HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ---------------- --------- ARCS RESIST./GR ----------- ARC5-063 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT). 3121.0 BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G) : 8.80 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): LIS Tape Verifica,lon Listing 2 -DEC -1997 17:09 PAGE: 25 Schlumberger Alaska Computing Center FLUID LOSS (C3) : RESISTIVITY (OHMK) AT TEMPERATURE (DEGF) : 64EB ** MUD AT MEASURED TEMPERATURE (MT) : 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE VALUE MUD FILTRATE AT (MT) : 0.045 155.0 14M CAKE AT (MT) 2 # 0 NEUTRON TOOL 73 MATRIX: 4 MATRIX DENSITY: 1 HOLE CORRECTION (IN): 66 6 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 8 REMARKS: CDR RUN ON RUNS 1,2 0.5 ARCS RUN ON RUNS 3 - 9 65 HOLE ANGLE AT TD = 97.8 DEG @ 14061' 11 CDR RUN IN 8.5" HOLE 18 ARCS RUN IN 6" HOLE 68 WELL IS LATERAL OF 5-43 13 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, V5.OB SOFTWARE 65 FT 15 66 68 LIS FORMAT DATA 66 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 1 LIS Tape Verifica,-Lon Listing 2 -DEC -1997 17:09 Schlumberger Alaska Computing Center PAGE: 26 ** SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 9 1 1 4 68 0000000000 ROP5 LW6 F/HR 00 000 00 0 9 1 1 4 68 0000000000 TABR LW6 HR 00 000 00 0 9 1 1 4 68 0000000000 GR LW6 GAPI 00 000 00 0 9 1 1 4 68 0000000000 P10H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 P16H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 P22H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 P28H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 P34H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 A10H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 A16H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 A22H LW6 OHMq 00 000 00 0 9 1 1 4 68 0000000000 A28H LW6 ORWI 00 000 00 0 9 1 1 4 68 0000000000 A34H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000 --------------------------------------------------------------------------------------- * * DATA * * DEPT. 12069.000 ROP5.LW6 37.250 TABR.LW6 -999.250 GR.LW6 -999.250 P10H.LW6 -999.250 P16H.LW6 -999.250 P22H.LW6 -999.250 P28H.LW6 -999.250 P34H.LW6 -999.250 A10H.LW6 -999.250 A16H.LW6 -999.250 A22H.LW6 -999.250 A28H.LW6 -999.250 A34H.LW6 -999.250 DEPT. 12000.000 ROP5.LW6 50.140 TABR.LW6 -999.250 GR.LW6 -999.250 P10H.LW6 -999.250 P16H.LW6 -999.250 P22H.LW6 -999.250 P28H.LW6 -999.250 P34H.LW6 -999.250 A10H.LW6 -999.250 A16H.LW6 -999.250 A22H.LW6 -999.250 A28H.LW6 -999.250 A34H.LW6 -999.250 DEPT. 11000.000 ROP5.LW6 42.060 TABR.LW6 2.244 GR.LW6 52.804 P10H.LW6 6.399 P16H.LW6 6.438 P22H.LW6 6.927 P28H.LW6 7.369 P34H.LW6 7.290 A10H.LW6 6.097 A16H.LW6 6.752 A22H.LW6 7.178 A28H.LW6 7.272 A34H.LW6 7.113 DEPT. 10691.000 ROP5.LW6 -999.250 TABR.LW6 -999.250 GR.LW6 54.605 P10H.LW6 -999.250 P16H.LW6 -999.250 P22H.LW6 -999.250 P28H.LW6 -999.250 P34H.LW6 -999.250 A10H.LW6 -999.250 A16H.LW6 -999.250 A22H.LW6 -999.250 A28H.LW6 -999.250 A34H.LW6 -999.250 ** END OF DATA ** LIS Tape Verificat--Lon Listing 2 -DEC -1997 17:09 PAGE: 27 Schlumberger Alaska Computing Center **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT) : **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT) : FILE HEADER 17 -JUN -97 FILE NUMBER 10 RAW MWD V5 R24 Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: 0.5000 14061.0 TOP LOG INTERVAL (FT): FILE SUMMARY BOTTOM LOG INTERVAL (FT) : VENDOR TOOL CODE START DEPTH STOP DEPTH ---------------- MWD ----------- ---------- 11993.0 12705.0 MINIMUM ANGLE: LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION: S.OB DATA TYPE (MEMORY or REAL-TIME) : MEMORY TD DRILLER (FT): 14061.0 TOP LOG INTERVAL (FT): 8410.5 BOTTOM LOG INTERVAL (FT) : 14061.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ---------------- --------- ARCS RESIST./GR ----------- ARC5-063 $ LIS Tape Verifica,lon Listing 2 -DEC -1997 17:09 PAGE: 28 Schlumberger Alaska Computing Center BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) FLUID LOSS (C3) : RESISTIVITY (OIR4M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT). 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE MUD FILTRATE AT (MT): 0.045 155.0 MUD CAKE AT (MT) : NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN ON RUNS 1,2 ARCS RUN ON RUNS 3 - 9 HOLE ANGLE AT TD = 97.8 DEG 14061' CDR RUN IN 8.5" HOLE ARCS RUN IN 6" HOLE WELL IS LATERAL OF S-43 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, V5.0B SOFTWARE LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT LIS Tape Verifica,-on Listing 2 -DEC -1997 17:09 PAGE. 29 Schlumberger Alaska Computing Center ------------------------------ TYPE REPR CODE VALUE 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ------------------------------ SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 10 1 1 4 68 0000000000 ROPS LW7 F/14R 00 000 00 0 10 1 1 4 68 0000000000 TABR LW7 HR 00 000 00 0 10 1 1 4 68 0000000000 GR LW7 GAPI 00 000 00 0 10 1 1 4 68 0000000000 P10H LW7 OHMM 00 000 00 0 10 1 1 4 68 0000000000 P16H LW7 OHM 00 000 00 0 10 1 1 4 68 0000000000 P22H LW7 OHMM 00 000 00 0 10 1 1 4 68 0000000000 P28H LW7 01M1 00 000 00 0 10 1 1 4 68 0000000000 P34H LW7 OHW 00 000 00 0 10 1 1 4 68 0000000000 A10H LW7 OHMM 00 000 00 0 10 1- 1 4 68 0000000000 A16H LW7 OEM 00 000 00 0 10 1 1 4 68 0000000000 A22H LP17 OM4M 00 000 00 0 10 1 1 4 68 0000000000 A28H LW7 OHMT 00 000 00 0 10 1 1 4 68 0000000000 A34H LW7 OEM 00 000 00 0 10 1 1 4 68 0000000000 --------------------------------------------------------------------------------------- * * DATA * * DEPT. 12705.000 ROP5.LW7 15.910 TABR.LW7 -999.250 GR.LW7 -999.250 P10H.LW7 -999.250 P16H.LW7 -999.250 P22H.LW7 -999.250 P28H.LW7 -999.250 P34H.LW7 -999.250 A10H.LW7 -999.250 A16H.LW7 -999.250 A22H.LW7 -999.250 A28H.LW7 -999.250 A34H.LW7 -999.250 DEPT. 12000.000 ROP5.LW7 -999.250 TABR.LW7 0.630 GR.LW7 52.377 P10H.LW7 11.150 P16H.LW7 11.693 P22H.LW7 13.255 P28H.LW7 14.522 P34H.LW7 14.160 A10H.LW7 9.207 A16H.LW7 10.671 A22H.LW7 11.681 A28H.LW7 11.809 A34H.LW7 11.433 DEPT. 11993.000 ROP5.LW7 -999.250 TABR.LW7 -999.250 GR.LW7 47.309 P10H.LW7 -999.250 P16H.LW7 -999.250 P22H.LW7 -999.250 P28H.LW7 -999.250 P34H.LW7 -999.250 A10H.LW7 -999.250 A16H.LW7 -999.250 A22H.LW7 -999.250 A28H.LW7 -999.250 A34H.LW7 -999.250 ** END OF DATA ** LIS Tape Verifica,�on Listing 2 -DEC -1997 17:09 PAGE: 30 Schlumberger Alaska Computing Center **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : OOICOl DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT) : **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT) : FILE HEADER 17 -JUN -97 FILE NUMBER I1 RAW MWD V5 R24 Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: 0.5000 14061.0 TOP LOG INTERVAL (FT) : FILE SUMMARY BOTTOM LOG INTERVAL (FT) : VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 12624.0 12888.0 MINIMUM ANGLE: LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION: S.OB DATA TYPE (MEMORY or REAL-TIME): MEMORY TD DRILLER (FT). 14061.0 TOP LOG INTERVAL (FT) : 8410.5 BOTTOM LOG INTERVAL (FT) : 14061.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ------------------------- ARC5 RESIST./GR ----------- ARCS -063 $ LIS Tape Verificau,on Listing 2 -DEC -1997 17:09 PAGE: 31 Schlumberger Alaska Computing Center BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN). 8.500 DRILLERS CASING DEPTH (FT): 3121.0 REPR CODE VALUE BOREHOLE CONDITIONS 66 MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): 73 MUD PH: 4 MUD CHLORIDES (PPM): 1 FLUID LOSS (C3). 66 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): 6 MUD AT MEASURED TEMPERATURE (MT) : 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE 65 MUD FILTRATE AT (MT) : 0.045 155.0 MUD CAKE AT (MT) 0.5 9 65 NEUTRON TOOL MATRIX. MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN ON RUNS 1,2 ARCS RUN ON RUNS 3 - 9 HOLE ANGLE AT TD = 97.8 DEG @ 14061' CDR RUN IN 8.5" HOLE ARC5 RUN IN 6" HOLE WELL IS LATERAL OF 5-43 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, VS. OB SOFTWARE # LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT LIS Tape Verifica,-Lon Listing 2 -DEC -1997 17:09 PAGE: 32 Schlumberger Alaska Computing Center ** DATA ** DEPT. 12888.000 ROP5.LW8 P10H.LW8 -999.250 P16H.LW8 P34H.LW8 -999.250 A10H.LW8 A28H.LW8 -999.250 A34H.LW8 DEPT. 12624.000 ROP5.LW8 P10H.LW8 -999.250 P16H.LW8 P34H.LW8 -999.250 A10H.LW8 A28H.LW8 -999.250 A34H.LW8 ** END OF DATA ** 176.470 TABR.LW8 -999.250 P22H.LW8 -999.250 A16H.LW8 -999.250 -999.250 TABR.LW8 -999.250 P22H.LW8 -999.250 A16H.LW8 -999.250 -999.250 GR.LW8 ------------------------------ TYPE REPR CODE VALUE -999.250 -999.250 A22H.LW8 -999.250 -999.250 GR.LW8 54.036 -999.250 ------------------------------ 11 66 -999.250 18 -999.250 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 ------------------------------ 66 1 SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 11 1 1 4 68 0000000000 ROPS LW8 F/HR 00 000 00 0 11 1 1 4 68 0000000000 TABR LW8 HR 00 000 00 0 11 1 1 4 68 0000000000 GR LW8 GAPI 00 000 00 0 11 1 1 4 68 0000000000 P10H LW8 OHMM 00 000 00 0 11 1 1 4 68 0000000000 P1 6,U LW8 ORW 00 000 00 0 11 1 1 4 68 0000000000 P22H LW8 ORM 00 000 00 0 11 1 1 4 68 0000000000 P28H LW8 OHMM 00 000 00 0 11 1 1 4 68 0000000000 P34H LW8 OHMM 00 000 00 0 11 1 1 4 68 0000000000 A10H LW8 OHMM 00 000 00 0 11 1 1 4 68 0000000000 A16H LW8 OHMM 00 000 00 0 11 1 1 4 68 0000000000 A22H LW8 0194M 00 000 00 0 11 1 1 4 68 0000000000 A28H LW8 OHMM 00 000 00 0 11 1 1 4 68 0000000000 A34H --------------------------------------------------------------------------------------- LW8 Ohm 00 000 00 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 12888.000 ROP5.LW8 P10H.LW8 -999.250 P16H.LW8 P34H.LW8 -999.250 A10H.LW8 A28H.LW8 -999.250 A34H.LW8 DEPT. 12624.000 ROP5.LW8 P10H.LW8 -999.250 P16H.LW8 P34H.LW8 -999.250 A10H.LW8 A28H.LW8 -999.250 A34H.LW8 ** END OF DATA ** 176.470 TABR.LW8 -999.250 P22H.LW8 -999.250 A16H.LW8 -999.250 -999.250 TABR.LW8 -999.250 P22H.LW8 -999.250 A16H.LW8 -999.250 -999.250 GR.LW8 -999.250 -999.250 P28H.LW8 -999.250 -999.250 A22H.LW8 -999.250 -999.250 GR.LW8 54.036 -999.250 P28H.LW8 -999.250 -999.250 A22H.LW8 -999.250 LIS Tape Verificat-i-on Listing 2 -DEC -1997 17:09 PAGE: 33 Schlumberger Alaska Computing Center **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION 001CO1 DATE 97/12/ 2 MAX REC SIZE 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT): **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : OOICOI DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE BOTTOM LOG INTERVAL (FT): FILE HEADER FILE NUMBER 12 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ---------------- ----------- ---------- MWD 12815.0 14061.0 # LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION: 5.OB DATA TYPE (MEMORY or REAL-TIME) . MEMORY TD DRILLER (FT) : 14061.0 TOP LOG INTERVAL (FT) : 8410.5 BOTTOM LOG INTERVAL (FT): 14061.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: 45.0 MAXIMUM ANGLE: 61.0 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ---------------- --------- ARCS RESIST./GR ----------- ARC5-063 # LIS Tape Verifica,lon Listing 2 -DEC -1997 17:09 PAGE: 34 Schlumberger Alaska Computing Center BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 REPR CODE VALUE BOREHOLE CONDITIONS 66 MUD TYPE: QUICKDRILL MUD DENSITY (LB/G) : 8.80 MUD VISCOSITY (S) 73 MUD PH. 4 MUD CHLORIDES (PPM) : 1 FLUID LOSS (C3) : 66 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): 6 MUD AT MEASURED TEMPERATURE (MT): 0.090 155.0 MUD AT MAX CIRCULATIONG TEMPERATURE 65 MUD FILTRATE AT (MT): 0.045 155.0 MUD CAKE AT (MT) 0.5 9 65 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: CDR RUN ON RUNS 1,2 ARC5 RUN ON RUNS 3 - 9 HOLE ANGLE AT TD = 97.8 DEG @ 14061' CDR RUN IN 8.5" HOLE ARC5 RUN IN 6" HOLE WELL IS LATERAL OF 5-43 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, VS.OB SOFTWARE # LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 35 Schlumberger Alaska Computing Center ---------------------------- TYPE REPR CODE VALUE 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ------------------------------ SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 12 1 1 4 68 0000000000 ROPS LW9 F/HR 00 000 00 0 12 1 1 4 68 0000000000 TABR LW9 HR 00 000 00 0 12 1 1 4 68 0000000000 GR LW9 GAPI 00 000 00 0 12 1 1 4 68 0000000000 P10H LW9 01M, 00 000 00 0 12 1 1 4 68 0000000000 P16H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000 P22H LW9 OHIKM 00 000 00 0 12 1 1 4 68 0000000000 P28H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000 P34H LW9 OL94M 00 000 00 0 12 1 1 4 68 0000000000 A10H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000 A16H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000 A22H LW9 OHM 00 000 00 0 12 1 1 4 68 0000000000 A28H LW9 ORWT 00 000 00 0 12 1 1 4 68 0000000000 A34H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000 --------------------------------------------------------------------------------------- * * DATA * * DEPT. 14061.000 ROP5.LW9 37.040 TABR.LW9 -999.250 GR.LW9 -999.250 P10H.LW9 -999.250 P16H.LW9 -999.250 P22H.LW9 -999.250 P28H.LW9 -999.250 P34H.LW9 -999.250 A10H.LW9 -999.250 A16H.LW9 -999.250 A22H.LW9 -999.250 A28H.LW9 -999.250 A34H.LW9 -999.250 DEPT. 14000.000 ROP5.LW9 32.970 TABR.LW9 -999.250 GR.LW9 -999.250 P10H.LW9 -999.250 P16H.LW9 -999.250 P22H.LW9 -999.250 P28H.LW9 -999.250 P34H.LW9 -999.250 A10H.LW9 -999.250 A16H.LW9 -999.250 A22H.LW9 -999.250 A28H.LW9 -999.250 A34H.LW9 -999.250 DEPT. 13000.000 ROP5.LW9 50.990 TABR.LW9 2.727 GR.LW9 54.437 P10H.LW9 10.238 P16H.LW9 11.361 P22H.LW9 13.221 P28H.LT99 14.584 P34H.LW9 14.330 A10H.LW9 11.467 A16H.LW9 11.702 A22H.LW9 12.453 A28H.LW9 12.822 A34H.LW9 12.544 DEPT. 12815.000 ROP5.LW9 -999.250 TABR.LW9 -999.250 GR.LW9 64.820 P10H.LW9 -999.250 P16H.LW9 -999.250 P22H.LW9 -999.250 P28H.LW9 -999.250 P34H.LW9 -999.250 A10H.LW9 -999.250 A16H.LW9 -999.250 A22H.LW9 -999.250 A28H.LW9 -999.250 A34H.LW9 -999.250 LIS Tape Verifica,,on Listing 2 -DEC -1997 17:09 PAGE: 36 Schlumberger Alaska Computing Center ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : 001col DATE : 97/12/ 2 MAX REC SIZE 1024 FILE TYPE LO LAST FILE BOTTOM LOG INTERVAL (FT) : **** FILE HEADER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : 001 C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE NUMBER 13 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 1 MAD PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH MAD 9770.0 9873.0 9 LOG HEADER DATA DATE LOGGED: 17 -JUN -97 SOFTWARE: SURFACE SOFTWARE VERSION: V5 R24 DOWNHOLE SOFTWARE VERSION. 5.OB DATA TYPE (MEMORY or REAL-TIME): MEMORY TD DRILLER (FT): 14061.0 TOP LOG INTERVAL (FT): 8410.5 BOTTOM LOG INTERVAL (FT) : 14061.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: 61.0 MAXIMUM ANGLE: 80.0 LIS Tape Verifica —on Listing 2 -DEC -1997 17:09 PAGE: 37 Schlumberger Alaska Computing Center # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ---------------- --------- ARCS RESIST./GR ----------- ARC5-063 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLERS CASING DEPTH (FT): 3121.0 # BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHNIM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 0.090 70.0 MUD AT MAX CIRCULATIONG TEMPERATURE MUD FILTRATE AT (MT): 0.045 70.0 MUD CAKE AT (MT) : 0.000 0.0 NEUTRON TOOL MATRIX. MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 20000 REMARKS: CDR RUN ON RUNS 1,2 ARCS RUN ON RUNS 3 - 9 HOLE ANGLE AT TD = 97.8 DEG @ 14061' CDR RUN IN 8.5" HOLE ARCS RUN IN 6" HOLE WELL IS LATERAL OF 5-43 MAD PASS DATA COLLECTED (ARCS ONLY) 9873'-9770' DATA FROM DOWNHOLE MEMORY, VS.OB SOFTWARE # LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ------------------------------ TYPE REPR CODE VALUE ------------------------------ 1 66 0 2 66 0 LIS Tape Verifica ,on Listing 2 -DEC -1997 17:09 PAGE: 38 Schlumberger Alaska Computing Center ------------------------------ TYPE REPR CODE VALUE ------------------------------ 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ------------------------------ SET TYPE - CHAN ** --------------------------------------------------------------------------------------- NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) --------------------------------------------------------------------------------------- DEPT FT 00 000 00 0 13 1 1 4 68 0000000000 ROPS MAI F/HR 00 000 00 0 13 1 1 4 68 0000000000 TABR MAI HR 00 000 00 0 13 1 1 4 68 0000000000 GR MAI GAPI 00 000 00 0 13 1 1 4 68 0000000000 P10H MAI OHWT 00 000 00 0 13 1 1 4 68 0000000000 P16H MAI OlHof 00 000 00 0 13 1 I 4 68 0000000000 P22H MAI OI -24M 00 000 00 0 13 1 1 4 68 0000000000 P28H MAI ORW 00 000 00 0 13 1 1 4 68 0000000000 P34H MAI OIRT4 00 000 00 0 13 1 1 4 68 0000000000 A10H M41 OHDf1 00 000 00 0 13 1 1 4 68 0000000000 A16H MAI OINK 00 000 00 0 13 1 1 4 68 0000000000 A22H MAI OHM%T 00 000 00 0 13 1 I 4 68 0000000000 A28H MAI OHWT 00 000 00 0 13 1 1 4 68 0000000000 A34H MAI OHMM 00 000 00 0 13 1 1 4 68 0000000000 --------------------------------------------------------------------------------------- * * DATA * * DEPT. 9873.000 ROP5.MA1 153.850 TABR.MAI P10H.MA_7 -999.250 P16H.MA1 -999.250 P22H.MA1 P34H.MA1 -999.250 A10H.MA1 -999.250 A16H.MA1 A28H.MA1 -999.250 A34H.MA1 -999.250 DEPT. 9770.000 ROPS.MAI 88.680 TABR.MAI P10H.MA1 5.696 P16H.MA1 6.093 P22H.MA1 P34H.MA1 8.000 A10H.MAI 1.389 A16H.MA1 A28H.MA1 3.896 A34H.MA1 4.777 -999.250 GR.MAI -999.250 -999.250 P28H.MA1 -999.250 -999.250 A22H.MA1 -999.250 0.258 GR.MA1 105.299 7.230 P28H.MA1 8.223 2.156 A22H.MA1 3.002 LIS Tape Verifica-- on Listing 2 -DEC -1997 17:09 PAGE: 39 Schlumberger Alaska Computing Center * * ENI? OF DATA * * **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : OO1C01 DATE : 97/12/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/12/ 2 ORIGIN : FLIC TAPE NAME : 97472 CONTINUATION # : 1 PREVIOUS TAPE . COMMENT : B.P. EXPLORATION, PRUDHOE BAY 5-43 L1, API 450-029-22754-60 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/12/ 2 ORIGIN : FLIC REEL NAME : 97472 CONTINUATION # : PREVIOUS REEL . COP94ENT : B.P. EXPLORATION, PRUDHOE BAY 5-43 L1, API #50-029-22754-60