Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-053STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.260
D77s z/4�2v
JAN I^79
i. Type of Request. Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well 0 Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing 0 Ch r Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class: •
Exploratory ❑ Development
5. Permit to Drill Number 197-063
3_ Address: P.O. Box 196612 Anchorage, AK
8. API Number 60-029-22754-60-00 '
99519-6612
Stretigrephic ❑ Service ❑
7. If perforating.
B. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perorations require a spacing exception? Yes ❑ No 0
PBU S-43LI
9, Property Designation (Lease Number):10.
Field/Pools:
ADL 028257
PRUDHOE BAY. PRUDHOE OIL '
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft):
Total Depth TVD(ih Effective Depth MD: Effective Depth TVD: MPSP (psi);
Plugs (MD): j
Junk (MO):
14061
8845 - 8887 8465 2520
8867
8498,9070,9077
Casing
Length Size MD TVD
Collapse
Structural
Conductor
80 20" 34-114 34-114
1490
470
Surface
3087 9-5/81, 34-3121 34-3066
5750
3090
Intermediate
9718 7" 31-9749 1 31-8963
7240
5410
Production
Liner
4161 4-1/2" 9784-13945 8879- d3
8430
7500
Perforation Depth MD (ft):
Peroration Depth TVD (ft):
Tubing Size:
I TLfth Gracie:
Tubing MD (ft):
9807 - 13912
8889 - 8842
4-1/2" 12.6# 1W
L-80
28-9089
Packers and SSSV Type: 4-12" Baker S-3 Packer
Packers an S V MD (ft) and TVD (ft): 903218559
No SSSV Installed
No SSSV Installed
12. Attachments: Proposal Summary 0 Wellbore Schematic ®
AilWelivass after proposed work.
Detailed Operations Program ❑ BOP Sketch 0
Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑
14. Estimated Date for Commencing Operations: March 1, 2020 -
15. Well Status after proposed work:
Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Date:
Commission Representative.
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is We and the a herein will not Contact Name: McLaughlin, Sean
be deviated from without prior written approval.
^ Contact Email: Sean.McLaughlin@bp.com
Authorized Name: Mdaughlin, Sean M v Contact Phone: +1 907 223-6784
Authorized Title: Eng! eying Team d - CTD
Authorized Signature: 1 Date: G ( Y 12,07-0
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that representative may witness Sundry Number:
Plug Integrity ❑ BOP Test a-taMechanical Integrity Test ❑ Location Clearance ❑ —O
Other: �o PC 2557 TB 3 S'6C516-51
FEB 0 a 7M
Post Initial Injection MIT Req'tl? Yes 11113DMsw�
No ❑ -
Spacing Exception Required? Yes ❑ No (!� Subsequent Form Required:
APPROVED BYTHE
Approved by: COMMISSIONER COMMISSION Date:
ORIGINAL
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval.
. — '70
/h t Forth and
Attachments in Duplicate
To: Alaska Oil & Gas Conservation Commission
From: Sean McLaughlin ( by
RWO/CTD Engineer
Date: January 29, 2020 00
Re: S-43 Sundry Approval
Well Type: Producer i
Current Status: The well is currently not operable due to corrosion and multiple tubing leaks.
Request: Sundry approval is requested for plans to restore tubing integrity.
History and current status:
Well S-41 was drilled as a multi lateral completion in 1997 with L-80 liner and tubing. The original tubing
is still in the well. The well has a history of failing TIFLs. The well has had two tubing leaks since the well was
originally completed. The first tubing leak was at station 1, and was squeezed in 2009. The well was operable
from that point until 2014, when it failed another MIT -IA. The second leak was identified at station 2 and was
patched.
In 2017 The well was found to have IA pressure over normal operating limits, due to failed SO check
valves. Slickline performed a caliper which indicated multiple areas of corrosion, with most severe penetration at
4645' MD. A plug was set at 8867' MD, and a CMIT-TxIA was performed in December of 2017 to 2395 psi. An
attempt was made to set a dummy valve in station 3, with no success. A second plug was set above station 3,
and the tubing was tested to 2417 psi. The source of TxIA is believed to be in stations 3 and 2.
Proposed plan: 11
The CDR2 rig will swap the tubing to restore tubing integrity. MASP = 2520 psi.
CDR2 BOPE will be configured as follows (BOP schematic attached for reference):
• One Annular preventer
• One Blind Ram -type preventer
• Mud cross with outlets for choke and kill lines
• One VBR preventer.
Testing will be in accordance with State and BP policy of a 7 day BOP test. Testing will be 3500 psi high and
250 psi low for all components.
The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram
of both the current and proposed wellbore is attached for reference.
Scope of Work: The primary objective of this RWO is to replace tubing to restore tubing integrity.
Pre -Ria Prep Work:
1. V: PPPOT-T, PPPOT-IC. Cycle LDS.
2. F: CMIT- TAA to 3000 psi, OA Integrity test.
3. E: Cut Tubing at -8800' MD
4. F: CMIT-TxIA to 1000 psi. Circulate out well.
5. V: Install BPV. Install dry hole tree
6. O: Bleed WHP(s) to zero. Remove the well house and flow line. Install wellhead valves as needed.
Install dry hole tree. Level the pad as needed.
Proposed RWO Procedure:
1. MIRU. ND tree. NU and test BOPE to 3500 psi
2. Pull 4-1/2" tubing from pre -rig cut at -8800'
3. Run new 4-1/2" 13 -CR Stacker Packer Completion.
4. Freeze protect well. Set TWC. ND BOPE. NU and test tree. RDMO.
Post ria Work:
1. V: Post RWO, install production tree
2. S: Drop B&R. LRS to set packer. Pull B&R. Set GLVs. Pull RHC. Pull WRP.
3. F A/SL: Circ Fluid. Set Packer. U -Tube FP. *I 1T-' _/� �o ZSbOS s
4. V: Tree work as necessary. Surface Reconnect 14
Sean McLaughlin CC: Well File
RWO/CTD Engineer Joe Lastufka
223-6784
TREE= 4-1/16"CNV
WELLHFAD=FMC
MO
ACTU
_ATOR= BA
OKB. B.EV =
68.1'
BF. ELB/ =
_
KOP=
1800'
Max Angle =
98' @ 128(19'
Datum MD=
9762'
Datum TVD,=
_
8800'SS
CONTOR,
L-80, D = 8.835' -- 3121 •
UNKNOWN (12/05/17)
TOP OF A CBdElT (0123109
4-12' SC-WRP (12104/17)
Minimum D = 2AS" @ 8498'
46 FLO-GUARD PATCH j
.0152 hof. D
(01/14109) H ?
RA PP TAG 967$'
I FISH - 2 RLR STEM ROLLERS (0926/09) 1
L PIOR, D = 3.675- (-I 9774'
SXNP,D=3.813' 9797
XN NP, D = 3.725' 9799'
' VVLFG, D = 3.956'9606'
RA PP TAG 9824'
TOP OF 4-12' LNR 10059'
83 bpf, D = 6276' 1019W
PERFORATION SUK#AkRY
REF LOG: PDS JEWELRY LOG OF D9115/99
ANGLEATTOPPEW 68' Q 9807'
Note: Refer 10 Production DB for historical perf data
SIZE SPF I INTERVAL I Opn/Sgz I DATE
SEE PG 2 FOR PERFORATION DATA
I I i i
S-43
L1
SAFETY NOTES: WELL ANGLE> 70 DEG 42 9920'
RESTRICTION 2' BELOW STA#1' (ID=325-)— FISH-
MISC PARTS FROM STA M (3124=)—
-2-1-9—r-- 9758' ES CBu8JTM-
ST
MO
ITVDIDLVI
07/31117 ZV/DMD GLVCJO(0729/17)
TYPE
VLV
LATCH
FORE
DATE
7
3028
2977
18
K3G2LS
DMY
NT
0
07/29/17
6
5308
5144
19
KBC-2LS
DAY
M
0
07/29/17
5
6508
6279
18
KBG-2LS
DFM
M
0
04/30/07
4
7205
6991
18
KBG2LS
DMY
M
0
0729/17
3
8063
7756
20
KBG-2LS
M
0
12/06/17
2
8W7
8172
21
KBG2LS
"DMY
M
0
03113/14
1
8952
8518
56
KBG-2LS
-DFM
Ni
0
0123/09
' STA #1 - UMY w /EXTENDED PIG (BEHIND CMT SHFAT14
"STA #2 - DW w AXf aD@ PKG
—STA #3 - MODFID OW, 12 LONGER w 1FRLCEN3 RS PKG
9021' 4-12• TES X NP, D = 3.813'
9037 7" x 4-12" BKR S-3 R(R, D= 3.875"
9065' 4-12' HES X NP, D = 3.813'
9O7T d-12" HPS X NP. D = 3 813'
am T LOGGED 09/15/99
7- CSG F,LLOLIT WINDOW (S-43 Li) 9749' - 9761'
07AL• W RKR SFTTNr: RI V fI = 5 �,.w
----------------------
---------------------
S-43 L7 IS AN OH SLID LNR w /OUT LTP / HGR
WELL NOT WL ACCESSIBLE
4-12'SLTDLMR,12.1T#,L-80, 13'.
.0152bI)f, D= 3.958'
1 -17' X 4-12' TW S6 PKR, D = 3.868'
10070' 7-X4-12-TFN OTKs TGR, D=3.925-
4- 112'
.925'4-112' ES CEMENTER
12884' MC f )cT a
D= 3.885'
= 3.958' 1380T
DATE COF.RBNTS
DATE REV BY COMAENTS8622A7ORGINAL
COMPLETION
07/31117 ZV/DMD GLVCJO(0729/17)
12/15/11VVELL NAME OOWLCfION
12/18117 BSBAD FULLED PATCI-/SET V%W & FISH
IFIEVBY
04!15/14MVDCUFWJ3: TJN
12/18/17 ZV/DMD GLV (70(12/06/17)
04/17/14 GLV CJO(O4/IV14)
11103115 GLV C/O(11101/15)
0724117 GLV GO (07/19/17)
FRUCHOE BAY LM
WHL: S-431 L1
PEFUT No: 197052011970530
An Fb: 50-029-22754-00 (W)
S. T12K T12E. 1068' FN_ 8 77T FWL
BP 6cploraltoo (Alaska)
PERFORATON SI&WARY
RIF LOG: PDS JEWELRY ON 09/15/89
ANGLEAT TOP PBiF: 66` @ 9807'
Wte: Refer to Production DB for historical pert date
SIZE
SPF I KTER4AL I OpnGgz
I SHOT I SOZ
oe171/97 0111GINAL COMPLETION
S43 L7
ZVIAO
GLV CIO (0729/17)
4-12'
I SLID 1 9807 - 13912 I
O
1 D6/221071
04/15/14 PJC MN 1)CORR37ION
S-43
ZVIJMJ
GLVCJO(12J06117)
2-
4 106W - 1062D
O
D5/17/02
T
4 10645 - 10970
O
05/17)02
r
4 10710 - 10726
0
05/17)02
r
4 11640 -11690
0
05/17)02
r
4 11915 -11940
0
05/17102
2"
4 12010 -12085
O
05/17102
r
4 12100 -12250
O
09/16W
T
4 12310 - 12490
O
09/1689
4-12'
SLTD 12913 - 13805
O
06/22197
S-43
L1
----------------------
�r I ---------------------F
5-43 L7 IS AN OH SLT'D LNR w TOUT LTP / NCR
1 WELL NOT WL ACCESSIBLE
DATE REV BY COM. 14TS
DATE
REV BY
COM.BdTS
oe171/97 0111GINAL COMPLETION
07/31/17
ZVIAO
GLV CIO (0729/17)
12/15111 PJC wEL NAAEcomcTIDN
12/18/17
B59JWD
ft11.®R4TCWSETVA88FISH
04/15/14 PJC MN 1)CORR37ION
12/18/17
ZVIJMJ
GLVCJO(12J06117)
04/17/14 WeVAC GLV aO(04/14114)
11103115 DJSlJMD GLV 00(11/01/15)
0724/17 JPK/JMD GLV CYO (07/19/17)
PRLUFM BAY Lf r
WELL: 5-431 L1
PEFW No: 197052011970530
AR No: 50029-22754-00 (60)
5. T12M T12E 1068' FNL & 77T FVC
BP &pioratbn (Alaska)
TREE = 4-1/16" CNV
WELLHEAD=
FMC
ACTUATOR=
BAMER
OKB. ELEV =
68.1'
BF. ELEV =
37.7
KOP=
1800'
Max Angle =
98' Q 12809'
Datum MD =
9767
Datum TVD=
88W SS
9-5/8' CSG, 40#, L-80, D
TOPOFt4ce4wTlot a/09) 8817'
4-1/2'SC-WRP(12/04/17) 8887
S-43
Proposed L1
CEMFTfT SHEATH, D = 3.70'(01/23109) 8888"$980'
.0152 bof, D = 3.958"
7" X 4-1/2' BKR ML PKR D = 3.875' 977,V
41/2'1$XNP,D=3.813' 9792'
41/7 HES XN NP, D= 3.725" 9799'
41/2' WLEG, D= 3.958"
LN2
PERFORATION SLAWRY
REF LOG: PDS JEWELRY LOG OF 09/15/99
ANGLEATTOPPB=F.68-@ 9807'
Note: Refer to Production DB for historical cert data
SEE PG 2 FOR PERFORATION DATA
SAFETY NOTES: WELL ANGLE> 70 DEG @ 9820'.
RESTRICTION 2' BELOW $TAXV (ID=3.25-)— FISH-
MISC PARTS FROM STA #6 (3/24/06)""
4-1/2' HES X NIP, D = 3.813'
7- HES'TNP Pi CR, ID =3.88'
4-1/2' HES X NIP, In = 3.813'
4-1/2" UMI Overshot
9021' 1—I4-1/2' FES X fes, D = 3.813
9032' 7" x 4-1/2" BKR S-3 FFR D = 3.875"
9065' 4-1/2" HES X NP, D = 3.813'
An77' 4-1/2' H64 X NP D = 3 813'
� ytJny Iia-iic wLw. u=�.ax
9088' ELMD TT LOGGED 09115P99
7- CSG MLLOUT WNDOW (S-43 L7) 9749'-9761-
----J,
749'-9761'
---------------------
S-43 Lt IS AN OH SLT'D LNR w/OUr UP / HGR
WELL NOT WL ACCESSIBLE
D = 3.958"
10059' j -j7" TEBACK SLV, D = 5.374"
1 7' X 4-10 TlW S-6 R(R D = 3.868'
=3�4� �ft� '�—
DATE REV BY COMvIRM
RATE REV BY
CORNAMS
08/22197 ORIGINAL COMPLETION
07/31/17 ZV/JW
GLV UO (07/29/17)
12/15/11 PJC WELL NAM= OORFIECTION
12/18/17 8SF/JM)
RJLLEDPATCWSEr WRP 8 FISH
04/15/14 PJC MN 1) CORRECTION
12/18/17 ZV/JMJ
GLVG/O(12I06/17)
04/17/14 VWPJMD GLV CIO (04/14/14)
11/03/15 DJS/JMO GLV 5/O(11/01/15)
07/24/17 JRVJMO GLV C/O (07/19117)
PRUGH OE BAY LINT
WELL: S-43 / L1
PEFUT No: 1970520 /1970530
API No: 50-029-2275400 (60)
15, T12N, T1 2E, 1066' FNL 877T FWL
BP Exploration (Alaska)
12'
HYDRIL 13-5/8" 5K PS
GK ANNULAR BOP
LATCHED HEAD
5K FLANGE CONNECTION
3-1/8" 5,0001 WP
CAMERON TYPE F"
GATE VALVE
HYDRIL 13-518" 5k PSI
MPL SINGLE GATE
3-1/8" 5,0001 WP FLANGED CONNECTION
CAMERON HCR VALVE
DRILLING SPOOL
1/16" KILL LINE 13-5/8"-5K PSI FLANGED
3°-5K PSI FLANGED OUTLETS
HYDRIL 13-5/8" 5k PSI
MPL SINGLE GATE
FLANGED CONNECTION
Carlisle, Samantha J (CED)
From: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent: Tuesday, February 4, 2020 12:56 PM
To: Rixse, Melvin G (CED)
Cc: Carlisle, Samantha J (CED)
Subject: RE: PTD197-053, Sundry 320-059 - Please Rescind PBUS-431-1 tubing swap
Mel,
My apologies.
Please rescind the sundry request for S -43L1 (PTD #197-053).
If you need anything else, please let me know. Thanks!
Thank you,
Joe Lastufka
SIM Specialist
Cell: (907) 227-8496 1 Office: (907) 564-4091
Subsurface &Well
' bUn+rtaH;ib•RMtltf�.:nao.
BP Exploration Alaska ) 900 E. Benson Blvd. I Room: 717B I Anchorage, AK
From: Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>
Sent: Tuesday, February 4, 202012:53 PM
To: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Cc: Carlisle, Samantha 1 (CED) <samantha.carlisle@alaska.gov>
Subject: PTD197-053, Sundry 320-059 - Please Rescind PBUS-43L1 tubing swap
Joe,
AOGCC requires only one sundry request for well work on PBU S-43 (PTD197-052). The sundry request for S-431-1,
PTD197-053 which describes identical well work should be rescinded.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),
State of Alaska and is for the sole use of the! ntended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or
disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,
and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin Rixse@alaska.Rov).
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Sean M. McLaughlin
Engineering Team Lead — CTD & RWO
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU S -43L1
Permit to Drill Number: 197-053
Sundry Number: 319-075
Dear Mr. McLaughlin:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogc c.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
V, a.
DATED this Z &y of February, 2019.
z �W 919
1 � 1
RB�M
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well 0 Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing 0 Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Curtent Well Class.
Exploratory ❑ Development 0
5. Permit to Drill Number: 197-053 '
3. Address: P.O. Box 196612 Anchorage, AK
99519-6612
Stratigraphic ❑ Service ❑
6. API Number: 50-029-22754-60-00 '
7. If perforating:
B. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes ❑ No 0
PBU SAX1 "
9. Property Designation (Lease Number):
10. Field/Pools:
ADL 028257.
PRUDHOE BAY. PRUDHOE OIL "
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (1t):
Total Depth TVD(ft) : Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
14061 -
8845 8867 8465 2520 8867 8498, 9070, 9077
Casing
Length Size MD TVD Burst Collapse
Structural
Conductor
80 20" 34-114 34-114 1490 470
Surface
3087 9-5/8" 34-3121 34-3066 5750 3090
Intermediate
9718 7" 31-9749 31-8963 7240 5410
Production
Liner
4161 4-1/2" 9784- 13945 8879-8843 8430 7500
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
1
9807-1
8889-8842
4-1/2" 12.6#
L-80
28-9089
Packers and SSSV Type: 4-1/2" Baker S-3 Packer
Packers and SSSV MD (ft) and TVD (ft): 9032 / 8559
No SSSV Installed
No SSSV Installed
12. Attachments: Proposal Summary 0 Wellbore Schematic ®
13. Well Class after proposed work.
Detailed Operations Program ❑ BOP Sketch 0
Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑
14. Estimated Date for Commencing Operations: May 1, 2019
15. Well Status after proposed work:
Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date:
GAS ❑ WAG 11GSTOR 13SPLUG [3Commission
Representative:
GINJ ❑ Op Shutdown ElAbandoned 11
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name. Hartley, Josephine
be deviated from without prior written approval.
Contact Email. Josephine. HartleyCbp.com
Authorized Name: Mdaughlin, Sean M Contact Phone: +1 9075644570
Authorized Title: En ineenng Team Lead - CTD & RWO
Authorized Signature: Date:
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
Plug Integrity BOP Test Ml-� Mechanical Integrity Test ❑ Location Clearance ❑
`❑
Other: rt)ee Kl� 1a��C `ji'TO YJS" �5 1
Post Initial Injection MIT Req'd? Yes ❑ No ❑
Spacing Exception Required? Yes ❑ No 2K Subsequent Form Required: 16 • �! O �f
APPROVED BYTHE �L Z`
rq
Approved COMMISSIONER COMMISSION Date 11
by
,�
titi
Form 10403 Revised 04/2017
ORIGINAL
RBDMS FEB 1 2319
�1ri2nB� Submit Form and
Approved application is valid for 12 months from the date of approval.y/�' /yr Attachments in Duplicate
To: Alaska Oil & Gas Conservation Commission
From: Josi Hartley
RWO/CTD Engineer bp
Date: February 18, 2019 0
Re: S-431_1 Sundry Approval
Well Type: Producer
Current Status: The well is currently not operable due to corrosion and multiple tubing leaks.
Request: Sundry approval is requested for plans to restore tubing integrity.
History and current status:
Well S-41 was drilled as a multi lateral completion in 1997 with L-80 liner and tubing. The original tubing
is still in the well. The well has a history of failing TIFLs. The well has had two tubing leaks since the well was
originally completed. The first tubing leak was at station 1, and was squeezed in 2009. The well was operable
from that point until 2014, when it failed another MIT -IA. The second leak was identified at station 2 and was
patched.
In 2017 The well was found to have IA pressure over normal operating limits, due to failed SO check
valves. Slickline performed a caliper which indicated multiple areas of corrosion, with most severe penetration at
4645' MD. A plug was set at 8867' MD, and AA1T �xFA waso_In December of 2017 to 2395 psi. An
attempt was made to set a dummy valve in s a1't on 3, wi no success. secon pug was set above station 3,
and the tubing was tested to 2417 psi. The source of TxIA is believed to be in stations 3 and 2.
Proposed plan:
The All American Oilfield 111 pulling unit will swap the tubing to restore tubing integrity. MASP = 2520 psi.
AAO 111 BOPE will be configured as follows (BOP schematic attached for reference):
• One Annular preventer
• One Blind Ram -type preventer
• Mud cross with outlets for choke and kill lines
• One Ram -type preventer dressed with Ram or VBR depending on what pipe is being ran/pulled.
Testing will be in accordance with State and BP policy of a 7 day BOP test. Testing will be 3500 psi high and
250 psi low for all components.
The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram
of both the current and proposed wellbore is attached for reference.
Scope of Work: The primary objective of this RWO is to replace tubing to restore tubing integrity.
Pre -Rig Prep Work:
1. V: PPPOT-T, PPPOT-IC. Cycle LDS.
2. F: CMIT- TxIA, OA Integrity test. >
3. E: Cut Tubing at -8800' MD p \
4. F: CMIT-TxIA. Circulate out well.
5. V: Install BPV. Tree Work u
6. O: Bleed WHP(s) to zero. Remove the well house and flow line. Install wellhead valves as needed.
Install dry hole tree. Level the pad as needed for the pulling unit.
Proposed RWO Procedure: L % 1 �OG�L
1. MIRU.NDtree. NU and test BOPE. hoyrr1D ice ohoyrg6y,,C_ ✓o
2. Pull Tubing.
3. Run new 4-1/2" 13 -CR Stacker Packer Completion.
4. Freeze protect well. Set TWC. ND BOPE. NU and test tree. RDMO.
Post ria Work:
1. V: Post RWO Tree Work
2. S: Drop B&R. LRS to set packer. Pull B&R. Set GLVs. Pull RHC. Pull WRP.
3. F A/SL: Circ Fluid. Set Packer. U -Tube FP.
4. V: Tree work as necessary. Surface Reconnect
Jos! Hartley CC: Well File
RWO/CTD Engineer Joe Lastufka
564-4570
TREE= 4-1/16•CMV
ACTLATOR= aAKtF(
OTB. EL Bf =_ 68.1',
BF. ELBt = 37.59
KOP= _ 1800'
Max Angle = 98• @ 12809'O
Datum MD= 9762-1#�
Datum TVD= 88W SS D-_.
9-5/8' CSG, 40#, L-80, D = 8.835'
F6H: 12 OF A DID HOLEFI DH2 ELEMENT
DEPTH LIJOJOIAN (12/05M 7)
Minimum ID = 2.468'@ 8498'
45 FLO-GUARD PATCH
1 45KB P14R ELEMENT LOST (12101/17)
FISH - BP ELERU11TS (01/14/09) 9077'
IBG.12.6#, L-80, .0152 bpf, D = 3.958' 9088'
TAG I -I 9578'
ROLLERS
S-43
L1
SAFETY NOTES: WELL ANGLE> 70 DEG @ 9820'
RESTRICTION 2- BELOW START (ID=326-)— FISH-
MISC PARTS FROM STA #6 (324106)"'
2197' ash' tS CRENTETR
1 W HES HXO SSSV N, D =
C.AS I FT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
I LATCH
PORT
DATE
7
3028
2977
18
KBG-2LS
DMY
M
0
0729117
6
5308
5144
19
KBG-2LS
DUY
M
0
0729/17
5
6508
6279
18
KBG-2LS
OW
M
0
04/30/07
4
7205
6941
18
KBG-2LS
DMY
M
0
0729117
3
8063
7756
20
KBG-2LS
M
0
12108117
2
8507
8172
21
KBG-2LS
" DVY
M
0
03/13/14
1
8952
8518
56
KBG-2LS
'DMY
M
0
0123109
'SIA#I -UNY W/tx1[TLJCU I'1'`la L6Qanv �./n� anw�nl
"STA #2 - DMY w /EXTENDED PKG
—STA #3 - MODFED DMY, 12 LONGER w /FRUDE BERG PKG
9091' 4-12' HES X NP, 0=3.813'
9032' N 7'x4-12' BKR S-3 PKR. D = 3.875'
9055' 4-12• HES X NP, D = 3.813 -
HES X
13•
HESX NP, D=3.813'
9089' �4-12'VJLEG,D=3.958'
9086' - ELIrD TT LOGGED 09/15/99
7- CSG MLLOUT V NDOW (S-43 L7) 9749'-9761-
9704' BKRSETTNGSLV,D=5.250'
1-_---_----------------
X4-12-BKR ML PK;, D=3.875 9774'
4-12' HES X NP, D = 3.813' 9792'
4-1/2' HES XN NP, D = 3.725' 9799'
4-1/2' 1/VLEG, D = 3.958' 9808'
TE
_____________________
00/22/97 ORIGINAL COMPLETION
-443 L7 IS AN OH SLID LNR w/OUT LTP / HGR
WELL NOT WL ACCESSIBLE
ZV/JMD GLVUO(07/2Wl7)
12/15/11 PJC V1�LNAMECU%-EUnON
BSEVhD RRLED PATCWSET VNRP8 F6H
4-1/2'SLTD LNf;12.6#,L-80,
.0152bpf, D = 3.958'
12/18117
10059' -t7•TESACK SLV,D=5.374'
TOP OF 4-i2•LNR 10059'
10065' 7•x4-12• rnv s -s Hvt D = 3.asa•
L-80, .0383 bpi, D = 6.276' 10196' \ 10070' 7• X 4-12• TNV DTH --S HGR, D = 3.925'
PE RFORATDN SLAMIARY uBJIHi
REF LOG: PDS JEWELRY LOG OF 09/15199 LfEn
128U' CTC DCT CSG PKR,
ANGLE AT TOP P9�: 68` @ 9807' D = 3.885'
Note: Refer to Production DB for historical perf data - _ _ _ _SIZE SPF INTERVAL Opn/Sgz DATESEE: PG 2 FOR PERFORATION LYTTA - _ _4-12' LHR, 12.6#_ _
DATE REV BY CONNA94TS
TE
REV BY COATrEYTS
00/22/97 ORIGINAL COMPLETION
1/17
j12/18/17
ZV/JMD GLVUO(07/2Wl7)
12/15/11 PJC V1�LNAMECU%-EUnON
BSEVhD RRLED PATCWSET VNRP8 F6H
04/15/14 PJC MN D CORRECTION
12/18117
ZV/JM) GLV CIO (12/06117)
04/17/14 W<HJRU GLV C/O (04114/14)
02/19/19
JNJ,MD ADDED DATES TO FISH/EDIT BF ELI
11/03115 DJS(JMD GLV CJO(11/01/15)
0724/17 JPWJMD GLV GO(07/19/17)
PRUDHOE BAY UNIT
VYH.L S-43 / L1
PERM! No: 1970520 /1970530
API No: 50.029-22754-00 (60)
5, T12K T12E, 1068' FN- 8 777' FAL
BP Exploration (Alaska)
PEWORATION SUMMARY
REF LOG: PDS JEWELRY ON 09/15/99
ANGLE AT TOP PERF: 68" @ 9807'
Note: Refer to Production DB for historical perf data
SIZE I
SPF I NTT3ZVAL I Opn/Sgz
I SHOT I SOZ
07/31/17
S-43 L7
12/15/11 PJC WELL NAME OORBECTION
4-1/2-1
SLTD 1 9807 - 13912 I O
106/22/971 -
12/18/17
S-43
0417/14 V% GLV GO (04/14/14)
2•
4 10600 - 10620 O
05/17102
2'
4 10645 - 10670 O
05/17102
2'
4 10710 - 10726 O
05/17/02
2'
4 11840 - 11890 O
05/17/02
2'
4 11915 - 11940 O
05/17102
2'
4 12010 - 12085 O
05/17102
2'
4 12100 - 12250 O
09/16/99
2-
4 12310 - 12490 O
09/16199
4-1/2'
SLTD 12913 - 13805 O
06/22/97
S-43
L1
of
of
----------------------
---------------------
S-43 L1 IS AN OH SLID LNR w10UT LTP / HOR Ln�
I WELL NOT WL ACCESSIBLE
DATE REV BY COMM NTS
DATE
REV BY COMbBNBS
06/22f97 ORIGINAL COMPLETION
07/31/17
ZV/JAU GLV CIO (0729117)
12/15/11 PJC WELL NAME OORBECTION
12/18/17
BS6'JMD FULLED PATCFVSET VOW & FISH
04/15/14 PJC MN D OOF3€CTDN
12/18/17
ZV/JMD GLV C/O (12106/17)
0417/14 V% GLV GO (04/14/14)
02/19/19
JNJJMD ADDED DATES TO FLSWEDIT BF F31
11/03/15 DJSIJMD GLV C/O(11101/15)
0724/17 JPK/JMD GLV CIO (07/19/17)
P UDHOE BAY UNR
WELL: S-43 / -1
PERMIT No: 197052011970530
AR No: 50-029-2275400 (60)
SEC 35, T1 2K T12E 1068' FKL & 77T FAIL
BP 6iploration (Alaska)
TREE= • 4-1/16' CMV
WEU EAD=
IMC
ACTUATOR=
BAKER
OKB. ELEV =
68-V
BF. ELEV =
37.2'
KOP=
1800'
Max Angle =
98" @ 12809'
Datum MID =
9762'
Datum TV D=
8800'SS
ID=
7
S-43
Proposea L1
TOPOF IA CEMENT (01/23/09) 8817'
4-1/2"SGWRP(12/04/17) 8867
EMENT SHEATH, ID= 3.70"(01/23/09) 8885'-8990' /
' TBG 12.6#, L-80 .0152 bpf, ID = 3.958" 9088"
RA PPTAG 9578'
7" X 4-1/2" BKR M- PKR D = 3.875" 9774'
4-1/2" HES X NP, —ID= 3.813" 9792' —
4-1/2" HES XN NP, D = 3.725" 9799'
4-1/2" WLEG, D=3.958" 9808'
RA PP TAG 9824'
TOP OF 4-1/2'LNR 10059'
7" CSG, 26# L-80-0383 bpf, D = 6.276" 10196'
PERFORATION SUMMARY
RE= LOG: PDS JEWELRY LOG OF 09115/99
ANGLEATTOPPE R-68'@ 9807'
Ite: Refer to Production DB for historical pert data
SFE PG 2
DATA
SAFETY NOTES: WELL ANGLE> 70 DEG @ 9820'. `
RESTRICTION 2' BELOW STA#1' (ID=3.25-)— FISH-
MISC PARTS FROM STA #6 (3/24/06)`"'
HES X
4-1f2' HES X NIP, ID = 3.8t 3'
F---144-1/2- x T'FES -W PKR, D=3.88
4-1/2" HES X NIP, ID = 3.813"
4-1/2" UMI Overshot
9021' 4-1/2' HES X NP, D = 3.813"
9032' T' x 4-1/2" BKR S-3 PKR D = 3.875"
9055• 4-1/2" HES X NIP, ID = 3.813"
— 9077' 4-1/2' HES X NIP, ID = 3.813'
9089' 4-112" WLECi, D=3.958"
9088' ELM) Tr LocGED os/15/ss
7" CSG MLLOUT WINDOW (S-43 L1) 9749' - 9761'
-------------------
---------------------
S43 L1 IS AN OH SLT'D LNRw/OUT LTP I HGR
REV BY COMNCNTS
WELL
NOT WL ACCESSIBLE
ZV/JMD GLV C/O (07/29117)
12/15111 PJC WELL NAM=CORRECi'DN
12118/17
BSEJMO PULLEDPATCFVSETWRP&F1SH
41/2"SLTDLNR12.6#,L-80,
12118/17
ZV/JMtD GLV CIO (12/06/17)
04/17/14 WK YJMD GLV CJO (04/14114)
.0152bpf, ID = 3.958"
10059'
7" TIEBACK SLV, D = 5.374"
10055'
47-"-X4 -1/2" TMV S-6 WR D = 3.868"
�I 10070" I
7" X 41/2" TMV DTH -S HGR D = 3.925"
;A
12884' CTG EXT CSG RCP,
D = 3.885"
W ------
12.6#, L-80_0152 bpf, D = 3.958" 13807' - - -
DATE I REV BY COMMENTS
DOTE
REV BY COMNCNTS
06/22197 JORIGINAL COMPLETION
07/31/17
ZV/JMD GLV C/O (07/29117)
12/15111 PJC WELL NAM=CORRECi'DN
12118/17
BSEJMO PULLEDPATCFVSETWRP&F1SH
04/15/14 PJC MN ID CORRECTION
12118/17
ZV/JMtD GLV CIO (12/06/17)
04/17/14 WK YJMD GLV CJO (04/14114)
11/03/15 DJS/JMD GLV VO (11/01/15)
07/24117 JRC/JMD GLV CfO (07/19117)
PRUDHOE BAY UNIT
WELL: S-43/1-1
PERMITNo: 197052011970530
AR No: 50-029-2Z754-00(60)
SE:35. T12N. T12E, 1068' FNL & 777' FWL
BP Exploration (Alaska)
1
2
3 4
4'_2^-
0
o
G e
A
A
T-815/is"
SHENKAI SL
13-5M ANNULAR
6'-103/x'
SHENKAI SL
13-5M DOUBLE RAM
B
B
8'-5'
4'--811/1s
I,
1 �41/6�1
T -25/s" 5'- 12
C
1,-93'
Xr
0
C
oOG
10A
GG
CLOSING / OPENNING VOLUME (GAL)
MIN
IT EMS CLOSING VOL OPENNING VOL
0*
30°
ANNULAR 23.59 1 17.41
D
RAM 4.39 3.91
p
HCR 0.40 0.40
NOTES:
THE GONTENTSOF THIS ORIHINOj
ARE THE PROPERTY OF MESTOIN
JP Sc, T
eaP 13-5M SOPS TACK
InvoRaAnon In Tws
ORAWNI3 IS FOR
ENERGY SERVICES PORP ANY
RERNGGWTI.c THIS
MAERO
NG
A-000-75-002 _
dMNN MTE ` E
TY 28ffeE12018 N.T.S.
�M
REFERENCEONLY
AND IS NOT FOR
DR NG WTNpff THE WRER4
RFAMI$$Ip1 oR KESTEfW
TA"d
0 INTIFL
RELEASE
TV MR OIMer201S
AgROVEO COTE SIZE
MJP 011M.,2016 A
SHEET
1 OF 1
O
CO"STRI.CT ON
EWRGYSBF ICESCORPIS
STMOMY RRGHIERED.
RN GEscRI=TIaN Er AVRo WTE
1
2
3 4
STATE OF ALASKA
ElVG
AL .,CA OIL AND GAS CONSERVATION COMM i- _SON
REPORT OF SUNDRY WELL OPERATIONS
IAY 2 .2014
1. Operations Abandon Li Repair Well ✓ '
Plug Perforations Lj Perforate Lj
Other
Performed: Alter Casing ❑ Pull Tubing❑
Stimulate - Frac ❑ Waiver ❑
Time Extension❑
Change Approved Program ❑ Operat. Shutdown❑
Stimulate - Other ❑ Re-enter Suspended Well❑
2. Operator
4. Well Class Before Work:
5. Permit to Drill Number:
Name: BP Exploration (Alaska), Inc
Development 0' Exploratory ❑
Stratigraphic❑ Service ❑
197-053-0
3. Address: P.O. Box 196612
6. API Number:
Anchorage, AK 99519-6612
50-029-22754-60-00
7. Property Designation (Lease Number):
8. Well Name and Number:
ADL0028257
PBU S-431_1
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary:
Total Depth measured 14061 feet
Plugs measured
None feet
true vertical 8844.55 feet
Junk measured
See Attachment feet
Effective Depth measured 13945 feet
Packer measured
9032 feet
true vertical 8843.08 feet
true vertical
8558.59 feet
Casing Length Size
MD TVD
Burst Collapse
Structural None None
None None
None None
Conductor 80 20" 91.5# H-40
31 - 111 31 -111
1490 470
Surface 3091 9-5/8" 40# L-80
30-3121 30-3065.55
5750 3090
Intermediate 9722 7" 26# L-80
27-9749 27-8862.5
7240 5410
Production None None
None None
None None
Liner 4161 4-1/2" 12.6# L-80
9784-13945 8879.27 - 8843.08
8430 7500
Perforation depth Measured depth 9807-13912 feet
True Vertical depth 8889.15 - 8842.4 feet
SCANNED MAY
2 2 U 14
Tubing (size, grade, measured and true vertical depth)
4-1/2" 12.6# L-80 25-9089
25-8584.48
Packers and SSSV (type, measured and true vertical depth)
8558.59 9032
8558.59 Packer
None None
None SSSV
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf Water -Bbl
Casing Pressure Tubing Pressure
Prior to well operation: 226
1090 1854
1675 232
Subsequent to operation: 0
0 0
0 0
14. Attachments:
15. Well Class after work:
Copies of Logs and Surveys Run
Exploratory❑ Development ❑✓
Service ❑ Stratigraphic ❑
Daily Report of Well Operations X
16. Well Status after work:
Oil L'Ij r Gas Lj WDSP
GSTOR ❑ WINJ ❑ WAG ❑
GINJ ❑ SUSP ❑ SPLUG❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Garry Catron
Email Garry. Catron(a_BP. Com
Printed Name Garry Catron
Title PDC PE
Signature
Phone 564-4424
Date 5/9/2014
V,)C 5-/z6//4
1-0e F12011
RBCMS MAY 14 2015
Form 10-404 Revised 10/2012 Submit Original Only
S -43L1
197-053-0
Junk Attachment
SW Name MD Date Description
IS -43L1 9077 1/14/2009 IBP Elements & Stiffiner Rin
IS -43L1 9774 9/26/2009 2 Stem Rollers
Daily Report of Well Operations
ADL0028257
T/I/O = SSV/10/90. Temp = SI. IA FL (E -Line). AL SI @ casing valve, ALP = 1930 psi. IA FL @
300'.
4/7/2014
SV, WV, SSV = C. MV = O. IA, OA = OTG. NOVP. 1430.
*** WELL SI ON ARRIVAL *** (E -LINE: SET PATCH)
INITIAL T/I/O = 1900/50/75 PSI
RIH W/ HEAD/XO/ERS/WB/CCL/BAKER 10 SETTING TOOL/45 KB STRADDLE PATCH. 29.25 ME
TO ME.; OAL = 53', FN = 1.38"
GOT STUCK WHILE ATTEMPTING TO CORRELATE AROUND 8407'
ABLE TO GET FREE AFTER RELAXING TENSION ON THE LINE. RAN SHOOTING PASS
ONLY.
MOVED SETTING DEPTH OF TOP ELEMENT TO 8500.7 DUE TO CCL RESPONSE (AVOID
SETTING IN POSSIBLE COLLAR).
PATCH SPECS: MAX OD = 3.70", MIN ID = 2.45", OAL = 35.36.
CCL TO TOP ME=8.2'
CCL TO STOP DEPTH = 8492.5'
PATCH SET @ 8500.7 ME - 8529.9 ME
TOP-OFTATCH @ 8497.9'.
USING TUBING TALLY DATED 06/22/97 FOR CORRELATION
IDENTIFIED WHAT SEEMS LIKE PARAFFIN ON TOOLS -ACQUIRED SAMPLE.
FINAL T/I/O = 1900/50/75
4/10/2014
*** JOB COMPLETE - WELL SI UPON DEPARTURE - PAD OP NOTIFIED OF STATUS ***
***WELL S/I ON ARRIVAL*** )(patch tug/liner)
R/U SWCP 4520
SET LLTP ( 3.65" od, 28"oal), S/D @ 8,494' SLM / 8,498' MD
4/13/2014
***WSR CONT ON 4/14/14***
T/1/0=1933/19/114 Temp=S1 Assist Slickline load & Test (PATCH TUBING LINER) Pump 5 bbl
meth spear, 230 bbls Crude down TBG. Pumped 1 bbl of meth and 8 bbls crude down IA to achieve
4/13/2014
MIT test pressure of 2500psi.****continue onto 04-14-14 WSR****
LHEAD= FMC
ACTUATOR=
BAKER
OKB. E LEV =
68.1'
BF. ELEV -
37.2'
KOP =
1800'
Max Angle = 98` @ 12809'
Datum MD = 9762'
Datum TVD = 8800' SS D =
9-5/8" CSG, 40#, L-80, D = 8.835' 3121'
Minimum ID = 2.45" @ 8498'
45 FLO-GUARD PATCH
45 BOT FLO-GUARD PATCH, I M8'-8535'
D = 2.45' (04/10/14) ✓
TOP OF IA CEuIENT (01/23/09) 8817'
CEMENT SFFATH, D = 3.70'(01/23/09) 8885'-8990'
4-1/2' TBG,12.6#, L-80, .0152 bpf, D = 3.958' I 9088'
FISH- BPE LEMENTS (01/14/09) —F
RA PP TAG 9578'
FISH- 2 RLR STEM ROLLERS (09/26/09) ?
7' X 4-1/2' BKR ML PKR, D = 3.875" 1-1 9774'
4-1/2' FE'S X NP, D = 3.813' 1-1 9792'
FES XN NP, D = 3.725" 1--1 9799-
/2" WLEG, D = 3.958' 1--L__9 808' 1
RA PP TAG 9824'
TOP OF4-1/2' LNR — 10059'
7" CSG, 26#, L-80, .0383 bpf, D = 6.276" 1—{ 10196'
PERFORATION SU L4kRY
REI: LOG: PDS JEWELRY LOG OF 09/15/99
ANGLE AT TOP PERF: 68" @ 9807'
Note: Refer to Production DB for historical pert data
WMAM ll'.� . IWIEMML�
SEB: PG 2 FOR PERFORATION DATA
ST
SA NOTES: WELL ANGLE> 70 DBS @ 9820'.
SSA
-(4,
RES i vACTION 2' BELOW STA#1' (ID=3.25")"' FISH -
L1
MISC PARTS FROM STA #6 (3/24/0 6)"
LATCH
2199-5ca�m
DATE
= 3.813"F
22092SOV N, ID
3028
GAS LFT MANDRFLS
ST
MD
TVD
DEV
TYPE
I VLV
LATCH
PORT
DATE
7
3028
2977
18
KBG-2LS
DOME
NT
16
04/14/14
6
5308
5144
19
KBG-21-S
DOME
NT
16
04/14/14
5
6508
6279
18
KBG-2LS
DW
NT
0
04/30/07
4
7205
6941
18
KBG-2LS
DONE
NT
16
04/14/14
3
8063
7756
20
KBG-2LS
SO
NT
24
04/14/14
2
8507
8172
21
KBG-2LS
"DIY
NT
0
03/13/14
1
1 8952
8518
56
KBG-2LS
'DIY
IFT
0
01/23/09
- 5I A #1 - D11AW' w /tX 1 tIV.713) Fi(G (fil:}�ND G M T SFEA T M
"STA #2 - DMY w /EXTENDED PKG (BEHND PATCH)
902V 4-1/2- HES X NP, D = 3.813-
9032' A 7" x 4-1/2" BKR S-3 PKR D = 3.875"
905V —F4-1/2'—FES X NP, D = 3.813"
9077' —14-1/2" FES X NIP, D = 3.813•
{ 908W -14-1/2' WLEG, D=3.958"
9086' SMD TT LOGG®09J15l99
7' CSG MLLOUT WINDOW (S-43 L1) 9749'-9761-
97W
749'-9761'9784' BKR SETTING SLV, ID = 5.250-
S-43 L1 IS AN OH SLID LNR w/OUT LTP / HGR
WELL NOT WL ACCESSIBLE
4-1/2'SLTD LWI2.6#,L-80, (--L 13945'
D
.0152bpf, = 3.958'
10059' 7' TIEBACK SLV , D = 5.374'
10065' 7" X 4-1/2" TIW S-6 PKR, D = 3.868'
10070' 7" X 4-1/2• TM/ DTH -S HGR D = 3.925"
12872' 4-1/2" ES CEMENTER
12884' CTC ERCT CSG PKR,
D = 3.885"
14-1/2- LNR, 12.6#, L-80_0152 bpf, D = 3.958"
DATE
REV BY
COMMENTS
DATE REV BY COMbBNTS
06/22/97
ORIGINAL COMPLETION
04111/14 RRD PJC SET PATCH (04/10/14)
04/27/11
AH/PJC
GLV CIO (04/24/11)
04115/14 PJC MN D CORRECTION
08/16/11 MCIW PJC
GLV CIO- SET WRP (8/15 - 16/11)
04/17/14 WKP/JMD GLV C/O (04/14/14)
11/28/11 MSS/J
GLV CIO (11/19/11)
12/15/11
JLJ/JKU I PULL WRP(11/17/11)
112/15/111
PJC
I WELL NAME CORRECTION
13807'
PRUDHOE BAY UNET
WELL: S-43 / L1
PE RIFT ND: 1970520 /1970530
AR ND: 50-029-2275400 (60)
SEC 35, T12K T12E; 1068' FNL 8 77T FwL
BP Exploration (Alaska)
S-43
L1
PERFORATION SIA"RY
Rff LOG: PDS JEWELRY ON 09/15/99
ANGLE AT TOP PERF: 68` @ 9807'
Note: Refer to Production DB for historical pert data
SIZE I SPF I INTERVAL I Opn/Sgz I SHOT I SQZ
S-43 L1
4-1/2-1 SLID 1 9807 - 13912 I O 106/22/97
2"
4
10600 - 10620
O
05/17/02
2"
4
10645 - 10670
O
05/17/02
2"
4
10710 - 10726
O
05/17/02
2"
4
11840 -11890
O
05/17/02
2"
4
11915 - 11940
O
05/17/02
2"
4
12010 - 12065
O
05/17/02
2"
4
12100 - 12250
O
09/16/99
2"
4
12310 - 12490
O
09/16/99
4-1/2"
SLTD
12913 - 13805
O
06/22/97
[i:iiill IS AN OH SLT'D LNR w/OUT LTP / HGR
WELL NOT WL ACCESSIBLE
DATE
REV BY
COMVENTS
DATE REV BY COWA34TS
06/22/97
ORIGINAL COMPLETION
04/11/14 RRLY PJC SET PATCH (04/10/14)
04/27/11
AH/PJC
GLV CJO (04/24/11)
04/15/14 PJC MN D CORRECTION
08/16/11 mcm Pic
GLV CJO- SET WRP(8/15 - 16/11)
04/17/14 VVKP/JMD GLV C/O (04/14/14)
11/28/11 LV>S/JMD
GLV CJO(11/19/11)
12/15/11
JLJ/JWD PU L VVRP(11/17/11)
12/15/11
PJC
WELL NAME CORRECTION
PRUDHOE BAY UNIT
VVELL: S-43 / L1
PERMT No: 1970520 /1970530
API No: 50-029-2275400 (60)
SEC 35, T12K T12E, 1068' FNL & 777' FVVL
BP Exploration (Alaska)
NOT OPERABLE: Producer S-43 (PT& 1970520) Secured with Kill Weight1d Page 1 of 2
,3-4q �q�
Regg, James B (DOA) ",��
From: AK, D&C Well Integrity Coordinator[AKDCWellintegrityCoordinator@bp.com]
Sent: Sunday, September 26, 2010 10:09 PM
To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK,
OPS GC2 Wellpad Lead; Engel, Harry R; AK, RES GPB East Production Optimization Engineer; AK, RES
GPB West Production Optimization Engineer; Cismoski, Doug A; AK, D&C Well Services Operations
Team Lead; AK, D&C Wireline Operations Team Lead; AK, OPS Prod Controllers; AK, OPS GC2 Field
O&M TL
Cc: AK, D&C Well Integrity Coordinator; Sayed, Mohamed; Janowski, Carrie
Subject: NOT OPERABLE: Producer S-43 (PTD# 1970520) Secured with Kill Weight Fluid
Attachments: S-43 TIO Plot 09-08-10.doc; S-43.pdf
All,
Producer S-43 (PTD #1970520) has been secured with kill weight. The well has been reclassified as Not
Operable. Pending completion of rig work on an adJacen we , diagnostics will be performed in an
attempt to mitigate the sustained casing identified on 9/4/2010.
The plan forward is as follows:
1. WIC: Once the rig has moved locations, reclassify the well as under evaluation
2. DHD; TIFL
3. Slickline: Set DGLVs pending TIFL results
4. Pumping: MIT -IA to 3000 psi, LLR if fails.
Please call if you have questions or concerns.
Thank you,
Gerald Murphy (alt. Torin Roschinger)
Well Integrity Coordinator
Office (907) 659-5102
Cell (907) 752-0755
Pager (907) 659-5100 Ext. 1154
From: AK, D&C Well Integrity Coordinator
Sent: Wednesday, September 08, 2010 5:36 PM
L�E .
To: 'Maunder, Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy (DOA) <guy.schwartz@alaska.gov>'; AK, OPS GC2 OSM; AK,
OPS GC2 Wellpad Lead; Engel, Harry R; AK, RES GPB East Production Optimization Engineer; AK, RES GPB West Production Optimization
Engineer; Cismoski, Doug A; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, OPS Prod
Controllers
Cc: AK, D&C Well Integrity Coordinator; Sayed, Mohamed; Janowski, Carrie
Subject: UNDER EVALUATION: Producer S-43 (PTD# 1970520) Sustained casing pressure on the IA
All,
Producer S-43 (PTD #1970520) has been found to have sustained casing pressure on the IA. The
wellhead pressures were tubing/IA/OA equal to 249/2200/0 psi on 09/04/2010. The well has been
reclassified as Under Evaluation and placed under a 28 day clock..
The plan forward is as follows:
1. DHD: TIFL
2. Slickline: Set DGLVs pending TIFL results
10/6/2010
NOT OPERABLE: Producer S-43 (Prn,4 1970520) Secured with Kill Weightid Page 2 of 2
3. Pumping: MIT -IA to 3000 psi, LLR if fails
A TIO plot and wellbore schematic have been included for your reference.
<<S-43 TIO Plot 09-08-10.doc>> <<S-43.pdf>>
Thank you,
Torin Roschinger (alt. Jerry Murphy)
Well Integrity Coordinator
Office (907) 659-5102
Harmony Radio x2376
Cell (406) 570-9630
Pager (907) 659-5100 Ext. 1154
10/6/2010
PBU 5-43
PTD 197052
9/26/2010
TIO Pressures Plot
4,000
3,000
2,000
1,000
Well: S43
06112/10 06/19/10 06/26/10 07/03110 07/10/10 07117110 07124/10 07131110 08/07/10 08/14/10 08/21/10 08/28/10 09/04/10
— Tbg
—i— IA
—A OA
DOA
OOOA
On
•
•
WELLHEAD =
FMC
ACTUATOR =
BAKER
KB. ELEV =
68.1'
BF. ELEV =
37.2'
KOP -
1800'
Max Angle =
98 @ 12809'
Datum MD =
9762'
Datum TV D =
8800' SS
9-5/8" CSG,
0 S -4 3 L 1 SAFETY :WELL ANGLE' (ID DEG @ 98201.
RESTRIG 2' BELOW STA#1ID=3.25")*** FISH-
MISC PARTS FROM STA #6 (3/24/06)***
9-5/8" ES CMTR 2197' 2209 4-1/2" HES HXO SSSVN, ID = 3.813"
GAS LIFT MANDRELS
L-80, ID = 8.835" 1-1 3121'
Minimum ID = 3.70" @ 8885'
CEMENT SHEATH
(TOP OF IA CEMENT (01/23/09) $$1T
CEMENT SHEATH (01/23/09) gg$5`.gggp`
I4-1/2" TBG, 12,6#, L-80_0152 bpf, ID= 3.958" I
FISH: IBP ELEMENTS (01/14/09) I—I ?
RA PIP TAG
I FISH: 2 RLR STEM ROLLERS (09/26/09) 1
7" X 4-1/2" BKR ML PKR, ID = 3.875"
4-1/2" HES X NIP, ID = 3.813"
4-1/2" HES XN NIP, ID = 3.725"
4-1/2" WLEG, ID = 3.958" ( 9808'
RA PIP TAG 9824'
TOP OF TIW TIEBACK SLV, ID = 5.374"
7" X 4-1/2" TMj S-6 PKR, ID = 3.868"
7" X 4-1/2" TIW DTH -S HGR, ID = 3.925"
17" CSG, 26#, L-80_0383 bpf, ID = 6.276" I
PERFORATION SUMMARY
REF LOG: PDS JEWELRY LOG OF 09/15/99
A NGLE AT TOP PERF: 68 @ 9807'
Note: Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
Opn/Sqz
DATE
3028
2977
SEE PAGE 2
KBG-2LS DOME
INT
16
08/22/09
FOR PERF
5308
5144
19
KBG-2LS DOME
BREAKDOWN
16
08/22/09
ST
MD
TVD
DEVI
TYPE I VLV
LATCH
PORT
DATE
7
3028
2977
18
KBG-2LS DOME
INT
16
08/22/09
6
5308
5144
19
KBG-2LS DOME
INT
16
08/22/09
5
6508
6279
18
KBG-2LS DMY
INT
0
04/30/07
4
7205
6941
18
KBG-2LS DOME
INT
16
08/22/09
3
8063
7756
20
KBG-2LS DMY
INT
2
8507
8172
21
KBG-21SO
INT
L—Ed
1
8952
8518
56
KBG-2LS *DMY
INT
*EXTENDED PACKING; BEHIND CEMENT SHEATH
4-1/2" HES X NIP, ID = 3.813" I
7" x 4-1/2" BKR S-3 PKR, ID = 3.875"
4-1/2" HES X NIP, ID = 3.813"
4-1/2" HES X NIP, ID = 3.813"
4-1/2" WLEG, ID = 3.958"
90$6' ELMD TT LOGGED 09/15/99
7" CSG MILLOUT WINDOW (S-43 L1) 9749'- 9761'
BKR SETTING SLV, ID = 5.250"
—" — 9807' TOP OF 4-1/2' SLTD LNR
* S-43 L1 IS AN OH SLID \
LNR W/O LNR TOP PKR OR
HGR. WELL NOT WL
ACCESSIBLE
BTM OF 4-1/2" SLID LNR
14-1/2"SLTD LNR,12.6#,L-80,.0152bpf, ID = 3.958" I
2884' H CTC EXT CSG PKR, ID = 3.885"
` 12913' ]-4TOPOF4-1/2" SLTD LNR
ES CEMTENTER 12872'
BTM OF 4-1/2" SLTD LNR 13805'—
4-1/2" SLTD LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 13$07'
DATE
REV BY COMMENTS DATE REV BY COMMENTS
06/22/97
ORIGINAL COMPLETION 10/04/09 ?/SV FISH
10/17/08 RRD/PJC SET IBP (10/11/08)
01/15/09
BSEISV PULL IBP/ FISH (01/14/09)
02/05/09
RLM/SV IA CMT SQZ/SHEATH (01/23/09)
03/04/09
KJB/SV I GLV C/O (02/21/09)
08/22/09
RPC/PJC GLV C/O
PRUDHOE BAY UNIT
WELL: S-43 L1
PERMIT No: 1970530
API No: 50-029-22754-60
SEC 35, T12N, T12E, 1068' FNL & 777' FWL
BP Exploration (Alaska)
• S -43L1 0
PERFORATION SUMMARY
REF LOG: PDS JEWELRY ON 09/15/99
ANGLE AT TOP PERF: 68 @ 9807'
Note: Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
Opn/Sqz
DATE
01/15/09
BSEISV PULL IBP/ FISH (01/14/09)
S-43 L1
RLM/SV IA CMT SOZ/SHEATH (01/23/09)
U:3/04/U91
4-1/2"
SLTD
9807-13912
O
06/22/97
S-43
2"
4
10600 - 10620
O
05/17/02
2"
4
10645 - 10670
O
05/17/02
2"
4
10710 - 10726
O
05/17/02
2"
4
11840 - 11890
O
05/17/02
2"
4
11915 -11940
O
05/17/02
2"
4
12010 - 12085
O
05/17/02
2"
4
12100 - 12250
O
09/16/99
2"
4
12310 - 12490
O
09/16/99
4-1/2"
SLTD
12913 - 13805
O
06/22/97
DATE
REV BY COMMENTS DATE REV BY COMMENTS
06/22197
ORIGINAL COMPLETION 10/04/09 ?/SV FISH
10/17/08
RRD/PJC SET IBP (10111/08)
01/15/09
BSEISV PULL IBP/ FISH (01/14/09)
02/05/09
RLM/SV IA CMT SOZ/SHEATH (01/23/09)
U:3/04/U91
KJB/SV I GLV C/O (02/21/09)
08/22/09
RPC/PJC I GLV C/O
PRUDHOE BAY UNIT
WELL: S-43 L1
PERMIT No: 1970530
A PI No: 50-029-22754-60
SEC 35, T1 2N, T1 2E, 1068' FNL & 777' FWL
BP Exploration (Alaska)
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
June 25, 2009
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of S -Pad
Dear Mr. Maunder,
�3 JUL 0 12009
Enclosed please find a spreadsheet with a list of wells from S -Pad that were treated
with corrosion inhibitor in the surface casing by conductor annulus. The corrosion
inhibitor is engineered to prevent water from entering the annular space and causing
external corrosion that could result in a surface casing leak to atmosphere. The
attached spreadsheet represents the well name, top of cement depth prior to filling and
volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
�•y,v��� � rt"
4ca
Torin Roschinger
BPXA, Well Integrity Coordinator
0 •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10-404)
S -pad
nat.
6/25/2009
Well Name
PTD #
Initial top of
cement
Vol. of cement
pumped
Final top of
cement
Cement top off
date
Corrosion
inhibitor
Corrosion
inhibitor/
sealant date
it
bbls
ft
na
gal
S -01B
1952020
0.25
NA
0.25
NA
2.6
5/30/2009
S -02A
1941090
0.25
NA
0.25
NA
1.7
5/25/2009
S-03
1811900
13.25
NA
13.25
NA
92.65
5/20/2009
S-04
1830790
0
NA
0
NA
0.9
5/25/2009
S -05A
1951890
0
NA
0
NA
0.9
5/26/2009
S-06
1821650
0
NA
0
NA
0.9
5/26/2009
S -07A
1920980
0
NA
0
NA
0.9
5/26/2009
8-08B
2010520
0
NA
0
NA
0.85
5/27/2009
S-09
1821040
1.5
NA
1.5
NA
9.4
5/31/2009
S -10A
1911230
0.5
NA
0.5
NA
3.4
5/31/2009
S -11B
1990530
0.25
NA
0.25
NA
1.7
5/27/2009
S -12A
1851930
0.25
NA
0.25
NA
1.7
6/1/2009
8-13
1821350
8
NA
8
NA
55.3
6/1/2009
S-15
1840170
0.25
NA
0.25
NA
3
6/2/2009
S-1 7C
2020070
0.25
NA
0.25
NA
2.6
6/1/2009
S -18A
2021630
0.5
NA
0.5
NA
3
6/2/2009
S-19
1861160
0.75
NA
0.75
NA
2.2
5/19/2009
S -20A
2010450
0.25
NA
0.25
NA
1.3
5/19/2009
S-21
1900470
0.5
NA
0.5
NA
3.4
5/25/2009
S -22B
1970510
0.75
NA
0.75
NA
3
5/19/2009
8-23
1901270
0.25
NA
0.25
NA
1.7
5/25/2009
S -24B
2031630
0.5
NA
0.5
NA
2.6
5/25/2009
S -25A
1982140
0.5
NA
0.5
NA
2.6
5/25/2009
5-26
1900580
0.75
NA
0.75
NA
3.4
5/26/2009
S -27B
2031680
0.5
NA
0.5
NA
2.6
5/31/2009
5-288
2030020
0.5
NA
0.5
NA
2.6
5/31/2009
S-29ALl
1960120
0
NA
0
NA
0.85
5/27/2009
5-30
1900660
0.5
NA
0.5
NA
5.1
5/31/2009
S -31A 1
1982200
0.5
NA
0.5
NA
3.4
5/26/2009
5-32
1901490
0.5
NA
0.5
NA
3.4
5/31/2009
S-33
1921020
0.5
NA
0.5
NA
4.3
5/26/2009
S-34
1921360
0.5
NA
0.5
NA
3.4
5/31/2009
5-35
1921480 1
0
NA
0
NA
.85 in
5/31/2009
5-36
1921160
0.75
NA
0.75
NA
4.25
5/27/2009
5-37
1920990
1.25
NA
1.25
NA
11.9
i 5/27/2009
5-38
1921270
0.25
NA
0.25
NA
10.2
1 5/27/2009
5-41
1960240
1.5
NA
1.5
NA
11.1
5/30/2009
S-42
1960540
0
NA
0
NA
0.9
5/30/2009
5-43
1970530
0.5
NA
0.5
NA
1.7
5/28/2009
S-44
1970070
0.25
NA
0.25
NA
1.7
5/28/2009
S-100
2000780
2
NA
2
NA
21.3
5/29/2009
S-101
2001150 1
1.25
NA
1.25
NA
11.9
5/29/2009
5-102LI
2031560
1.25
NA
i 1.25
NA
11.1
5/31/2009
5-103
2001680
1.5
NA
1.5
NA
11.9
5/18/2009
S-104
2001960
1.75
NA
1.75
NA
15.3
5/20/2009
5-105
2001520
4
NA
4
NA
32.7
5/20/2009
5-106
2010120
16.25
NA
16.25
NA
174.3
6/2/2009
5-107
2011130
2.25
NA
2.25
NA
28.9
5/18/2009
5-108
2011000
3.5
NA
3.5
NA
40
5/30/2009
S-109
2022450
2
NA
2
NA
21.3
5/30/2009
S-110
2011290 1
11.75
NA
11.75
NA
98.6
5/30/2009
5-111
2050510
2
NA
1 2
NA
Me
5/30/2009
S-112
2021350
0
NA
0
NA
0.5
5/30/2009
5-113
2021430
1.75
NA
1.75
NA
22.1
5/18/2009
5-114A
2021980
1.25
NA
1.25
NA
10.2
5/30/2009
S-115
2022300
2.5
NA
2.5
NA
27.2
5/29/259--
S-116
2031810
1.5
NA
1.5
NA
13.6
5/28/2009
S-117
2030120
1.5
NA
1.5
NA
15.3
5/29/2009
5-118
2032000
5
NA
5
NA
76.5
5/28/2009
5-119
2041620
1
NA
1
NA
5.2
5/30/2009
5-120
2031980
5.5
NA
5.5
NA
67.2
5/29/2009
5-121
2060410
4.5
NA
4.5
NA
53.6
5/28/2009
5-122
2050810
3
NA
3
NA
21.3
5/29/2009
S-123
2041370
1.5
NA
1.5
NA
20.4
5/26/2009
5-124
2061360
1.75
NA
1.75
NA
11.9
5/26/2009
S-125
2070830
2.25
NA
2.25
NA
20.4
5/28/2009
5-126
20710970
1.25
NA
1.25
NA
15.3
6/1/2009
S-200
1972390
1.25
NA
1.25
NA
14.5
5/28/2009
5-201
2001840
0
NA
0
NA
0.85
6/19/2009
S -213A
2042130
2
NA
2
NA
13.6
5/29/2009
S-215
2021540
2
NA
2
NA
18.7
6/1/2009 -
S-216
2001970
4.75
NA
4.75
NA
51
5/29/2W
S -217
2070950
0.25
NA
0.25
NA
1.7
6/1/2009
S-400
2070740
2
NA
2
NA
9.4
5/28/2009
S-401
2060780
16
NA
16
NA
99.5
6/2/2009
5-504
0
NA
0
NA
0.85
5/28/2009
•
WELL LOG
ProActive Diagnostic Services, Inc.
To: AOGCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907) 793-1225
RE: Cased Hole/Open Hole/ Mechanical Logs and/or Tubing Inspection(Caliper/ VM
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning
a signed copy of this transmittal letter to the following :
BP Exploration (Alaska), Inc.
Petrotechnical Data Center
Attn: Joe Lastufka
LR2-1
900 Benson Blvd.
Anchorage, Alaska 99508
and
ProActive Diagnostic Services, Inc.
Attn: Robert A. Richey
130 West International Airport Road
Suite C
Anchorage, AK 99518
Fax: (907) 245-8952
1) Coil Flag 22,Jan-09 S-431-1 EDE
2) Temperature Survey ,J }09 GNM4
r I
j
Signed
Print Name:
/9q -o6-3
50-029-2275460
1 Color Logi It �, 0
� ,- ,i k _ -
Date .
`2 0 2
PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518
PHONE: (907)245-8951 FAx: (907)24548952
E-MAIL: rdsar-chorage@memoriLlog.com WEBSITE: vwimmerrnorvlog.com
CADocuments and Sepings\Owner\Desktop\Tiansmit_BP.doex
TPPF = d-1 /1 F" MN
WELLHEAD=
FMC
ACTUATOR =
BA KER
KB. ELEV =
68.1'
BF. EL EV =
37.2'
KOP =
1800'
Max Angle =
98@ 12809'
Datum MD =
9762'
Datum TV D =
8800' SS
1 9-5/8" ES CMT'R
1 9-5/8" CSG, 40#, L-80, ID = 8.835" 1
\,
SAFETY NOTES: WELL ANGLE > 70 DEG @ 9820'
Sw43L &> 90 DEG @ 9875'.
219T T I 10
1 3121' 1
Minimum ID = 3.725" @ 9799'
4-1/2" HES XN NIPPLE
4-1 /2" TBG,12.6#, L-80, .0152 bpf, ID = 3.958" 9088'
RA RP TAG 1--1 9578'
I T' X 4-1 /2" BKR ML PKR, ID = 3.875" 9774'
4-1/2" HES X NIP, ID = 3.813" 9792'
4-1/2" HES XN NIP, ID = 3.725" 9799'
4-1/2" WLEG, D =3.958" 9808'
RA PIP TAG 9824'
TOP OF TIW TIEBACK SLV, ID = 5.374" 10059'
7"X 4-1/2" 11W S-6 PKR, ID= 3.868" 10065'
7" X 4-1/2" TIW DTH -S HGR, ID = 3.925" Ff 10070'
7" CSG, 26#, L-80_0383 bpf, ID = 6.276" 10196'
PERFORATION SUMMARY
REF LOG: PDS JEWELRY LOG OF 09/15/99
A NGLE AT TOP PERF: 68 @ 980T
Nnfa• PPfPr fin PrMijnfinn npt fnr hicfnrinni narF Mafia
SIZE
SPF
INTERVAL
Opn/Sqz
DATE
V LV
I LTCH
SEE PAGE 2
DATE
7
3028
2909
FOR PERF
KBG-2LS
DONE
BTM
16
B REA KDOW N
6
5308
2209' H4-1/2" HES HXO SSSV N, ID = 3.813"
GAS LIFT MANDRELS
ST
MD
TVD
DEV
TYPE
V LV
I LTCH
FORT
DATE
7
3028
2909
19
KBG-2LS
DONE
BTM
16
04/02/01
6
5308
5076
19
KBG-2LS
DONE
BTM
16
04/02/01
5
6508
6211
17
KBG-2LS
DV
BTM
0
04/02/01
4
7205
6873
19
KBG-2LS
DOKE
BTM
16
04/02/01
3
8063
7688
21
KBG-2LS
DV
BTM
0
04/02/01
2
8507
8105
25
KBG-2LS
DV
BTM
0
04/02/01
1
8952
8450
54
KBG-2LS
S/O
BTM
24
04/02/01
9021' -J4-1/2" HES X NIP, ID= 3.813"
9032' 7"x 4-1/2" BKRS-3 PKR, ID= 3.875"
9055 1'-14-1/2" HES X NIP, ID= 3.813"
907TJ-14-1/2" HES X NIP, ID = 3.813" I
9089' 4-1 /2" W LEG, ID = 3.958"
9086' ELMD TT LOGGED 09/15/99
7" CSG MILLOUT WINDOW
9749'- 9761' (S-43 L1)
9784' BKR SETTING SLV, ID = 5.250"
9807' T0POF4-1/2" SLTD LNR
*S-43 L1 IS AN OHSLT'DLNR
W/O L NR TO P PK R O R HGR.
WELL NOT WL ACCESSIBLE.
BTM OF 4-1/2" SLTD LNR 13912'
/l
4-1/2"SLTD LNR,12.6#,L-80,.0152bpf, ID= 3.958" 1-1 13945'
12884' CTC EXT CSG R<R ID = 3.8 85"
:7_
12913TOP OF 4-1 /2" SLT'D LNR
ES CMTR 12872'
BTM OF 4-1/2" SLTD LNR 13805'
4-1/2" SLTD LNR, 12.6#, L-80, .0152 bpf, ID=3.958" 13807'
DATE REV BY COMMENTS
DATE REV BY COMMENTS
06/22/97 ORIGINAL COMPLETION
03/14/01 SIS-QAA CONVERTEDTO CANVAS
03/16/01 SIS -CS FINAL
03/26/02 CH/KAK I CORRECTIONS
05/17/02 ATD/KK JADPERFS
MAY 3 0, 2DQ
PRUDHOEBAY UNIT
WELL: S-43 L1
PERMIT No: 1970530 0 , 1"'0
API No: 50-029-22754-60
Sec. 35, T1 2N, T12E
BP Exploration (Alaska)
PERFORATION SUMMARY
REF LOG: PDS JEWELRY LOG OF 09/15/99
ANGLE AT TOP PERF: 68 @ 9807"
Note: Refer to Production DB for historical pert data
SIZE
SPF
INTERVAL
Opn/Sqz
DATE
03/16/01 SIS -CS FINAL
03/26/02 CH/KAK 100RRECTIONS
S-43 L1
4-1 /2"
SLTD
9807-13912
O
06/22/97
S-43
2"
4
10600 - 10620
O
05/17/02
2"
4
10645 - 10670
O
05/17/02
2"
4
10710 - 10726
O
05/17/02
2"
4
11840 - 11890
O
05/17/02
2"
4
11915 - 11940
O
05/17/02
2"
4
12010 - 12085
O
05/17/02
4-1/2"
SLTD
12913- 13805
O
06/22/97
2"
4
12100 - 12250
O
09/16/99
2"
4
12310 - 12490
O
09/16/99
S-43 L1
PERFS
DATE REV BY COMMENTS
DATE REV BY COMMENTS
06/22/97 ORIGINAL COMPLETION
03/14/01 SIS-QAA COM/ ERTED TO CANVAS
03/16/01 SIS -CS FINAL
03/26/02 CH/KAK 100RRECTIONS
NEV" MAY 3 0 2003
PRUDHOE BAY UNIT
WELL: S-43 L1
PERMIT Noy --1976-580 ( A
API No: 50-029-22754-60
Sec. 35, T12N, T1 2E
BP Exploration (Alaska)
Y
Page: 1
Date: 05/24/99
T
/
RUN RECVD D BOX
------------- - ---
FINAL
11/05/97
AOGCC Individual Well
FINAL
Geological Materials Inventory
T
FINAL
11/05/97
PERMIT
DATA
T DATA PLUS
---------
97-053
----------------
CDR/ARCS-TVD
- -------------------------
8100-8900
97-053
CDR/ARC5-MD
vl 8410-13990 ,7�(
97-053
CDR/ARC5-MD
LV8410-13990 S�
p$
FINAL
05/19/99
97-053
7855
CHLUM CDR/ARC5
97-053
SRVY RPT
{ SCHLUM 0-14061.
97-053
DEFT-SPIN/TEM
PRES 9394-9779
97-053
PROD-SPIN/TEM
PRES/DEFT 2850-9779 al�3/9g
97-053
PROD-SPIN/TEM/
RES 9650-9950 y/30/419
Page: 1
Date: 05/24/99
T
/
RUN RECVD D BOX
------------- - ---
FINAL
11/05/97
T
FINAL
11/05/97
T
FINAL
11/05/97
T
109
11/05/97
11/03/97
FINAL
02/26/98
FINAL
02/26/98
p$
FINAL
05/19/99
10-407 LR- COMPLETION DATE @612,,21q71
DAILY WELL OPS R B /97 / TO / 7/ B
Are dry ditch samples required? yes And received?
Was the well cored? yes alysis & description received?._
Are well tests required) es�ceived?
Well is in compliance
Initial
COMMENTS
Schlumberger
Ge
- .-
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
Well
Job # Log Description
NO. 11857
Company: Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Cased Hole)
Date BL RF Sepia LIS Tape
2/25/98
gt
H-1 3
PERFORATING RECORD
980220
1
1
R-11
LEAK DETECTION
980220
1
1
R-11
INJECTION PROFILE
980221
1
1
R-11
GAMMA RAY/COLLAR/JEWELRY
980221
1
1
S-43 MULTI -LATERAL
FULL SUITE PRODUCTION LOG
980213
1
1
S-43 MULTI -LATERAL
DEFT LOG
980213
1
1
U-03
INJECTION PROFILE
980216
1
1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received
cs_�
12/3/97
Schlumberger
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
Well
Job # Log Description
NO. 11605
Company: Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Date BL RF Sepia Tape
S -22B REDO 97473 GR &ARC5 970708 1
*REDO -INCORRECT MNEMONICS
S-43 REDO 97471 CDR & ARC5 970530 1
*REDO -SPLICE RESISTIVITY
S-43 L1 REDO 97472 CDR & ARC5 970617 1
*REDO -MERGE RESISTIVITY IN EDIT FILE
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: '
5 JX -1-e)
' 3 L- Rc-0 /c? -7 --L)- k43
BP Exploration (Alaska) Inc. Schlumberger GeoQuest
Petrotectnical Data Center M133-3 500 W. International Airport Road
900 E. Benson Blvd. Anchorage, Alaska 99618-1199
Anchorage, Alaska 99519-6612.
Date Delivered: 1�'� f Received
�i"t•os3
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
Well
Job # Log Description
NO. 11515
Company: Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Date BL RF Sepia Tape
10/31/97
S-43 L1
97472
CDR ARC 5
970617 1
S-43 L1
97472
CDR ARC 5 2"
970617 1 1
S-43 L1
97472
CDR ARC 5 5"
970617 1 1
S-43 L1
97472
CDR ARC 5 TVD
970617 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center M133-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
gm-`% FC, E IND
NOV 5 199(
i�jaskdOas d..�l'r61�a. t.�titil(i"ti; l�J96
Ajii;�'l
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
N Oil ❑ Gas ❑ Suspended ❑ Abandoned ❑ Service
2. Name of Operator
BP Exploration (Alaska) Inc.
7. Permit Number
97-53
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
8. API Number
50-029-22754-60
4. Location of well at surface -
4211' NSL, 4503' WEL, SEC. 35, T12N, R12E, UPM :
At top of productive interval /
4442 NSL, 1485 WEL, SEC. 35, T12N, R12E, UPM = ,. ,-;
At total depth _ r
2947' NSL, 344' WEL, SEC. 26, T12N, R12E, UPM
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
S-431-1
11. Field and Pool
Prudhoe Bay Field /Prudhoe Bay
Pool
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 68.1'
6. Lease Designation and Serial No.
ADL 028257
12. Date Spudded
5/3/97
13. Date T.D. Reached
6/16/97
14. Date Comp., Susp., or Aband.
6/22/97
15. Water depth, if offshore
N/A MSL
16. No. of Completions
One
17. Total Depth (MD+TVD)
14061 8845 FT
18. Plug Back Depth (MD+TVD)
14061 8845 FT
19. Directional Survey 20.
NYes ❑No I
Depth where SSSV set
(Nipple) 2209' MD
21. Thickness of Permafrost
1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, LWD/FE, GR, RES
23• CASING LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE
CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 110' 30"
260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 30' 3121' 12-1/4"
1700 sx CSIII, 505 sx 'G'
7" 26# L-80 27' 9749' 8-1/2"
580 sx Class 'G'
4-1/2" 12.6# NT -80 9784' 13945' 6"
Uncemented Slotted Liner
24. Perforations open to Production (MD+TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
MD TVD MD TVD
9807'- 13912' 8889'-8842'
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2", 12.6#, L-80 9089' 9032'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 75 Bbls of Diesel
27. PRODUCTION TEST
Date First Production
July 4, 1997
Method of Operation (Flowing, gas lift, etc.)
Flowing
Date of Test Hours Tested PRODUCTION FOR OIL -BBL
TEST PERIOD
GAS -MCF
WATER -BBL
CHOKE SIZE
GAS -OIL RATIO
Flow Tubing Casing Pressure CALCULATED OIL -BBL
Press. 24-HOUR RATE
GAS -MCF
WATER -BBL
OIL GRAVITY -API (CORR)
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
ORIGINAL
Form 10-407 Rev. 07-01-80 ' Submit In Duplicate
29. Geologic Markers
30. Formation Tests
Marker Name
Measured
True Vertical
Include interval tested, pressure data, all fluids
Depth
Depth
recovered and gravity, GOR, and time of each phase.
Sag River
9751'
8864'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys, Annular Pumping Report
32. 1 hereby certify that t for oing is t an rrect to the best of my knowledge
Signed _..
Dan Stoltz Title Senior Drilling Engineer Date
S 97-53 Prepared By Name/Number: Terrie Hubble, 564-4628
Numb
Welll Number Permit No. /Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In,
Other -explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
ANNULAR INJECTION
DATA ENTRY SCREEN
Asset WQA.......................................... Legal Desc 421.1:N 1,�4;?R :INET.S. �T.12N,Fi..2..................................... Research
RigName Nab.QCs.1$E..............................................................................................................................................................................................................................................................
Inj Well Name $-..43 ............................................ Permit Start .........:.7.:7.......... Permit End .........5-.7-.95 ......... ..........................................................................................................
SurCsg De ............................... ...............................
............................... ...............................
Cumulative Data
Daily Data
S-43
05/22/97
280
280
3
850
S-43 ___..............____...—__.._._......_......_.-...._...
5-43
05/23/97
05/25/97
384
111
123
384
234
3
3
600-900
850
_.......... ............. _....... _........ __...__._ __._____...._....___..__....._...._.._......_.—.._._.._._...__.
S-43
05/27/97
203
204
407
3
850-900
S-43
S_....-4._..._...3 --- -._._..-----------
05/28/97
.05/30/97 ....------ —
151
------..__.._..__...._._.._._......_....._..__..
60
120
126
_..... _ __........_.._....._
........._ .__.._..............__......._......._......_............_._............
�
_ .._...._...................
271
186 ...... _. ...........................
3
3
900
900
..
........................__.._................................._._....
..............
S-43
06/01/97
303
375
678
2.5
900
S-43-��
06/03/97
75
75
2
900
S-43
06/04/97
150
150
2
900
S-43
06/05/97
70
70
3
900
8-43._..__......__.__
06/06/97
.�'.
.107
107 .....______.._
3
800
S-43
06/08/97
75
43
118
3
800
S-43
06/09/97
226
226
3
900
06/10/97
201
201
3
900
S-431-1
06/12/97
25
25
50
3
900
S-431-1
06/14/97
32
68
100
2.5
800
S -43L1
06/16/97
70
70
3
800
S -43L1
06/17/97
140
40
180
2.5
800
5-431-1 �
06/18/97
375
500
875
2.5
725
S -43L1
06/19/97
75
75
3
800
S -43L1
06/22/97
115
1,011
1,126
3
875
9-431-1 -
06/23/97
80
80 "-
2.6
1250
OPEN
I
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Date/Time
Duration
Activity
02 May 97 17:00-18:00
1 hr
Rigged down Drillfloor / Derrick
18:00-18:30
1/2 hr
Held safety meeting
18:30-19:30
1 hr
Rig moved 50.00 %
19:30-03:00
7-1/2 hr
Rig moved 100.00 %
03 May 97 03:00-06:00
3 hr
Rigged up Fluid system
06:00-10:00
4 hr
Rigged up Divertor
10:00-12:30
2-1/2 hr
Fill pits with Water based mud
12:30-13:00
1/2 hr
Held safety meeting
13:00-14:30
1-1/2 hr
Made up BHA no. 1
14:30-02:00
11-1/2 hr
Drilled to 1145.00 ft
04 May 97 02:00-02:30
1/2 hr
Pulled out of hole to 207.00 ft
02:30-03:00
1/2 hr
R.I.H. to 1145.00 ft
03:00-06:00
3 hr
Drilled to 1450.00 ft
06:00-09:30
3-1/2 hr
Drilled to 1640.00 ft (cont...)
09:30-10:30
1 hr
Repaired Drilling tool / logs
10:30-16:00
5-1/2 hr
Drilled to 2266.00 ft
16:00-16:30
1/2 hr
Pulled out of hole to 1050.00 ft
16:30-17:00
1/2 hr
R.I.H. to 2226.00 ft
17:00-22:30
5-1/2 hr
Drilled to 3135.00 ft
22:30-00:00
1-1/2 hr
Circulated at 3135.00 ft
05 May 97 00:00-01:00
1 hr
Pulled out of hole to 665.00 ft
01:00-02:00
1 hr
R.I.H. to 3135.00 ft
02:00-03:30
1-1/2 hr
Circulated at 3135.00 ft
03:30-04:30
1 hr
Pulled out of hole to 665.00 ft
04:30-06:00
1-1/2 hr
Pulled BHA
06:00-06:30
1/2 hr
Pulled BHA (cont...)
06:30-07:30
1 hr
Rigged up Casing handling equipment
07:30-08:00
1/2 hr
Held safety meeting
08:00-12:30
4-1/2 hr
Ran Casing to 3120.00 ft (9-5/8in OD)
12:30-14:30
2 hr
Circulated at 3120.00 ft
14:30-15:00
1/2 hr
Held safety meeting
15:00-17:00
2 hr
Mixed and pumped slurry - 153.700 bbl
17:00-20:00
3 hr
Circulated at 2200.00 ft
20:00-20:30
1/2 hr
Held safety meeting
20:30-23:00
2-1/2 hr
Mixed and pumped slurry - 530.000 bbl
23:00-02:30
3-1/2 hr
Removed Divertor
06 May 97 02:30-04:30
2 hr
Installed Casing head
04:30-06:00
1-1/2 hr
Rigged up BOP stack
06:00-07:00
1 hr
Rigged up BOP stack (cont...)
07:00-10:30
3-1/2 hr
Tested BOP stack
10:30-12:00
1-1/2 hr
Repaired Blind / Shear ram
12:00-12:30
1/2 hr
Tested Blind ram
12:30-15:30
3 hr
Made up BHA no. 2
15:30-16:00
1/2 hr
R.I.H. to 2197.00 ft
16:00-18:00
2 hr
Drilled cement to 2310.00 ft
18:00-18:30
1/2 hr
R.I.H. to 2992.00 ft
18:30-19:00
1/2 hr
Tested Casing - Via string
19:00-19:30
1/2 hr
Held drill (Kick (well kill))
19:30-20:30
1 hr
Drilled cement to 3155.00 ft
20:30-21:00
1/2 hr
Circulated at 3155.00 ft
21:00-21:30
1/2 hr
Performed formation integrity test
21:30-01:30
4 hr
Drilled to 3573.00 ft
07 May 97 01:30-02:30
1 hr
Circulated at 3573.00 ft
02:30-06:00
3-1/2 hr
Drilled to 3940.00 ft
Page 1
Date 27 August 97
Ir
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Date/Time
Duration
Activity
06:00-08:30
2-1/2 hr
Drilled to 4162.00 ft (cont...)
08:30-09:00
1/2 hr
Pulled out of hole to 3120.00 ft
09:00-09:30
1/2 hr
R.I.H. to 4162.00 ft
09:30-21:30
12 hr
Drilled to 5210.00 ft
21:30-22:00
1/2 hr
Held safety meeting
22:00-01:30
3-1/2 hr
Drilled to 5409.00 ft
08 May 97 01:30-02:00
1/2 hr
Circulated at 5409.00 ft
02:00-03:30
1-1/2 hr
Pulled out of hole to 657.00 ft
03:30-04:30
1 hr
Pulled BHA
04:30-06:00
1-1/2 hr
Made up BHA no. 3
06:00-08:30
2-1/2 hr
R.I.H. to 5409.00 ft
08:30-19:30
11 hr
Drilled to 6440.00 ft
19:30-20:00
1/2 hr
Pulled out of hole to 5350.00 ft
20:00-20:30
1/2 hr
R.I.H. to 6440.00 ft
20:30-06:00
9-1/2 hr
Drilled to 7150.00 ft
09 May 97 06:00-10:00
4 hr
Drilled to 7406.00 ft (cont...)
10:00-10:30
1/2 hr
Pulled out of hole to 6350.00 ft
10:30-11:00
1/2 hr
R.I.H. to 7406.00 ft
11:00-03:30
16-1/2 hr
Drilled to 8470.00 ft
10 May 97 03:30-04:30
1 hr
Circulated at 8470.00 ft
04:30-06:00
1-1/2 hr
Pulled out of hole to 4500.00 ft
06:00-07:30
1-1/2 hr
Pulled out of hole to 218.00 ft (cont...)
07:30-08:30
1 hr
Pulled BHA
08:30-10:00
1-1/2 hr
Made up BHA no. 4
10:00-13:00
3 hr
R.I.H. to 8740.00 ft
13:00-06:00
17 hr
Drilled to 8864.00 ft
11 May 97 06:00-06:00
24 hr
Drilled to 9461.00 ft (cont...)
12 May 97 06:00-06:30
1/2 hr
Circulated at 9461.00 ft
06:30-09:00
2-1/2 hr
Pulled out of hole to 218.00 ft
09:00-09:30
1/2 hr
Pulled BHA
09:30-10:00
1/2 hr
Installed Wear bushing
10:00-11:00
1 hr
Made up BHA no. 5
11:00-11:30
1/2 hr
R.I.H. to 3120.00 ft
11:30-12:00
1/2 hr
Serviced Block line
12:00-16:30
4-1/2 hr
R.I.H. to 9461.00 ft
16:30-06:00
13-1/2 hr
Drilled to 9867.00 ft
13 May 97 06:00-13:30
7-1/2 hr
Drilled to 10001.00 ft (cont...)
13:30-15:30
2 hr
Circulated at 10001.00 ft
15:30-19:00
3-1/2 hr
Circulated at 10001.00 ft
19:00-06:00
11 hr
Drilled to 10153.00 ft
14 May 97 06:00-08:00
2 hr
Drilled to 10205.00 ft
08:00-10:30
2-1/2 hr
Circulated at 10205.00 ft
10:30-12:30
2 hr
Pulled out of hole to 3100.00 ft
12:30-14:30
2 hr
R.I.H. to 10205.00 ft
14:30-18:00
3-1/2 hr
Circulated at 10205.00 ft
18:00-00:30
6-1/2 hr
Laid down 9600.00 ft of 5in OD drill pipe
15 May 97 00:30-02:30
2 hr
Pulled BHA
02:30-04:00
1-1/2 hr
Rigged up Top ram
04:00-04:30
1/2 hr
Rigged up Casing handling equipment
04:30-06:00
1-1/2 hr
Ran Casing to lin (1000.00 ft OD)
06:00-14:30
8-1/2 hr
Ran Casing to 9632.00 ft (lin OD) (cont...)
14:30-21:30
7 hr
Laid down 328.00 ft of Casing
21:30-00:00
2-1/2 hr
Circulated at 9300.00 ft
16 May 97 00:00-02:00
2 hr
Laid down 820.00 ft of Casing
Page 2
Date 27 August 97
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Date/Time
Duration
Activity
02:00-03:30
1-1/2 hr
Circulated at 8480.00 ft
03:30-06:00
2-1/2 hr
Laid down Casing of 1190.00 ft
06:00-16:00
10 hr
Laid down 8480.00 ft of Casing (cont...)
16:00-16:30
1/2 hr
Removed Casing handling equipment
16:30-19:00
2-1/2 hr
Rigged up Top ram
19:00-22:30
3-1/2 hr
Tested BOP stack
22:30-23:00
1/2 hr
Installed Bore protector
23:00-03:00
4 hr
Made up BHA no. 6
17 May 97 03:00-04:00
1 hr
Made up BHA no. 6
04:00-06:00
2 hr
Singled in drill pipe to 2000.00 ft
06:00-12:00
6 hr
Singled in drill pipe to 2000.00 ft (cont...)
12:00-12:30
1/2 hr
Reamed to 9330.00 ft
12:30-14:00
1-1/2 hr
Worked stuck pipe at 9325.00 ft
14:00-15:30
1-1/2 hr
Circulated at 9240.00 ft
15:30-02:30
11 hr
Reamed to 9504.00 ft
18 May 97 02:30-05:00
2-1/2 hr
Circulated at 9240.00 ft
05:00-06:00
1 hr
Washed to 9340.00 ft
06:00-20:30
14-1/2 hr
Washed to 9340.00 ft (cont...)
20:30-21:30
1 hr
Pulled out of hole to 9125.00 ft
21:30-22:00
1/2 hr
R.I.H. to 9428.00 ft
22:00-02:00
4 hr
Reamed to 9625.00 ft
19 May 97 02:00-05:00
3 hr
Reamed to 9632.00 ft
05:00-06:00
1 hr
Reamed to 9645.00 ft
06:00-08:00
2 hr
Reamed to 9645.00 ft (cont...)
08:00-10:00
2 hr
Circulated at 9664.00 ft
10:00-12:30
2-1/2 hr
Pulled out of hole to 500.00 ft
12:30-13:00
1/2 hr
Pulled BHA
13:00-14:30
1-1/2 hr
Rigged up Kelly
14:30-15:30
1 hr
Tested BOP stack
15:30-16:00
1/2 hr
Tested Kelly
16:00-17:00
1 hr
Made up BHA no. 7
17:00-00:00
7 hr
Singled in drill pipe to 9420.00 ft
20 May 97 00:00-06:00
6 hr
Reamed to 9717.00 ft
06:00-13:00
7 hr
Reamed to 10205.00 ft
13:00-14:00
1 hr
Circulated at 10205.00 ft
14:00-14:30
1/2 hr
Pulled out of hole to 8955.00 ft
14:30-15:00
1/2 hr
R.I.H. to 9740.00 ft
15:00-18:30
3-1/2 hr
Reamed to 9835.00 ft
18:30-19:00
1/2 hr
R.I.H. to 10205.00 ft
19:00-20:30
1-1/2 hr
Circulated at 10205.00 ft
20:30-23:30
3 hr
Pulled out of hole to 600.00 ft
23:30-00:00
1/2 hr
Pulled BHA
21 May 97 00:00-01:00
1 hr
Rigged up Top ram
01:00-02:00
1 hr
Rigged up Casing handling equipment
02:00-06:00
4 hr
Ran Casing to lin (3100.00 ft OD)
06:00-12:00
6 hr
Ran Casing to 3100.00 ft (lin OD) (cont...)
12:00-15:30
3-1/2 hr
Circulated at 9250.00 ft
15:30-17:30
2 hr
Ran Casing to 10196.00 ft (lin OD)
17:30-19:30
2 hr
Circulated at 10196.00 ft
19:30-20:30
1 hr
Circulated at 10196.00 ft
20:30-21:00
1/2 hr
Held safety meeting
21:00-23:00
2 hr
Rig waited: Equipment
23:00-00:00
1 hr
Mixed and pumped slurry - 242.000 bbl
22 May 97 00:00-01:00
1 hr
Displaced slurry - 387.000 bbl
Page 3
Date 27 August 97
Ir
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Page 4
Date 27 August 97
Date/Time
Duration
Activity
01:00-02:00
1 hr
Cleared Cement head
02:00-04:00
2 hr
Installed Seal assembly
04:00-05:00
1 hr
Rigged up Top ram
05:00-06:00
1 hr
Serviced Annular preventor
06:00-09:30
3-1/2 hr
Serviced Annular preventor (cont...)
09:30-12:30
3 hr
Tested BOP stack
12:30-14:30
2 hr
Rigged up Kelly
14:30-15:00
1/2 hr
Serviced Block line
15:00-16:30
1-1/2 hr
Rig waited: Equipment
16:30-19:00
2-1/2 hr
Made up BHA no. 8
19:00-22:30
3-1/2 hr
R.I.H. to 9600.00 ft
22:30-23:30
1 hr
Circulated at 9600.00 ft
23:30-00:00
1/2 hr
Held drill (Kick (well kill))
23 May 97 00:00-06:00
6 hr
Laid down 3100.00 ft of 5in OD drill pipe
06:00-12:30
6-1/2 hr
Laid down 9400.00 ft of 5in OD drill pipe (cont...)
12:30-13:00
1/2 hr
Removed Drillstring handling equipment
13:00-14:00
1 hr
Rigged up Drillstring handling equipment
14:00-15:30
1-1/2 hr
Singled in drill pipe to 9970.00 ft
15:30-16:30
1 hr
Drilled cement to 10103.00 ft
16:30-17:00
1/2 hr
Circulated at 10103.00 ft
17:00-18:00
1 hr
Tested Casing - Via annulus and string
18:00-19:00
1 hr
Drilled cement to 10205.00 ft
19:00-19:30
1/2 hr
Took MWD survey at 10190.00 ft
19:30-20:00
1/2 hr
Drilled to 10225.00 ft
20:00-21:00
1 hr
Circulated at 10225.00 ft
21:00-22:30
1-1/2 hr
Circulated at 10200.00 ft
22:30-23:00
1/2 hr
Took MWD survey at 10225.00 ft
23:00-00:00
1 hr
Drilled to 10263.00 ft
24 May 97 00:00-00:30
1/2 hr
Took MWD survey at 10263.00 ft
00:30-01:30
1 hr
Drilled to 10294.00 ft
01:30-02:00
1/2 hr
Took MWD survey at 10260.00 ft
02:00-05:00
3 hr
Drilled to 10358.00 ft
05:00-06:00
1 hr
Took MWD survey at 10358.00 ft
06:00-06:30
1/2 hr
Took MWD survey at 10358.00 ft (cont...)
06:30-10:00
3-1/2 hr
Pulled out of hole to 260.00 ft
10:00-11:00
1 hr
Downloaded MWD tool
11:00-12:30
1-1/2 hr
Made up BHA no. 9
12:30-15:30
3 hr
R.I.H. to 10358.00 ft
15:30-06:00
14-1/2 hr
Drilled to 10723.00 ft
25 May 97 06:00-22:00
16 hr
Drilled to 11658.00 ft (cont...)
22:00-23:30
1-1/2 hr
Circulated at 11568.00 ft
23:30-01:00
1-1/2 hr
Pulled out of hole to 9840.00 ft
26 May 97 01:00-01:30
1/2 hr
Logged hole with LWD: Formation evaluation (FE) from 9840.00 ft to
9596.00 ft
01:30-04:30
3 hr
Pulled out of hole to 260.00 ft
04:30-05:30
1 hr
Downloaded MWD tool
05:30-06:00
1/2 hr
Made up BHA no. 10
06:00-08:00
2 hr
Made up BHA no. 10 (cont...)
08:00-12:30
4-1/2 hr
R.I.H. to 11568.00 ft
12:30-13:30
1 hr
Worked toolstring at 10568.00 ft
13:30-16:30
3 hr
Pulled out of hole to 260.00 ft
16:30-19:00
2-1/2 hr
Pulled BHA
19:00-21:30
2-1/2 hr
Made up BHA no. 11
21:30-01:30
4 hr
R.I.H. to 11578.00 ft
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Page 5
Date 27 August 97
Date/Time
Duration
Activity
27 May 97 01:30-06:00
4-1/2 hr
Drilled to 11809.00 ft
06:00-10:30
4-1/2 hr
Drilled to 11949.00 ft (cont...)
10:30-11:00
1/2 hr
Repaired High pressure lines
11:00-12:30
1-1/2 hr
Drilled to 12012.00 ft
12:30-13:00
1/2 hr
Worked toolstring at 12012.00 ft
13:00-16:30
3-1/2 hr
Pulled out of hole to 260.00 ft
16:30-17:00
1/2 hr
Pulled BHA
17:00-19:00
2 hr
Made up BHA no. 12
19:00-23:00
4 hr
R.I.H. to 12012.00 ft
23:00-06:00
7 hr
Drilled to 12416.00 ft
28 May 97 06:00-03:00
21 hr
Drilled to 13188.00 ft (cont...)
29 May 97 03:00-04:30
1-1/2 hr
Circulated at 13188.00 ft
04:30-06:00
1-1/2 hr
Pulled out of hole to 7000.00 ft
06:00-08:30
2-1/2 hr
Pulled out of hole to 261.00 ft (cont...)
08:30-10:00
1-1/2 hr
Pulled BHA
10:00-10:30
1/2 hr
Retrieved Wear bushing
10:30-13:30
3 hr
Tested BOP stack
13:30-14:00
1/2 hr
Installed Wear bushing
14:00-16:00
2 hr
Made up BHA no. 13
16:00-17:30
1-1/2 hr
R.I.H. to 4000.00 ft
17:30-18:00
1/2 hr
Serviced Block line
18:00-21:30
3-1/2 hr
R.I.H. to 13188.00 ft
21:30-06:00
8-1/2 hr
Drilled to 13544.00 ft
30 May 97 06:00-13:30
7-1/2 hr
Drilled to 13888.00 ft (cont...)
13:30-15:00
1-1/2 hr
Circulated at 13888.00 ft
15:00-16:30
1-1/2 hr
Pulled out of hole to 9552.00 ft
16:30-19:00
2-1/2 hr
Logged hole with LWD: Formation evaluation (FE) from 9552.00 ft to
10250.00 ft
19:00-20:00
1 hr
R.I.H. to 13888.00 ft
20:00-22:00
2 hr
Circulated at 13888.00 ft
22:00-06:00
8 hr
Pulled out of hole to 261.00 ft
31 May 97 06:00-07:30
1-1/2 hr
Pulled BHA
07:30-08:30
1 hr
Rigged up Casing handling equipment
08:30-09:00
1/2 hr
Held safety meeting
09:00-15:00
6 hr
Ran Casing to 3748.00 ft (4-1/2in OD)
15:00-22:30
7-1/2 hr
Ran Drillpipe in stands to 10196.00 ft
22:30-00:00
1-1/2 hr
Circulated at 10196.00 ft
01 Jun 97 00:00-05:00
5 hr
Ran Drillpipe in stands to 13807.00 ft
05:00-06:00
1 hr
Circulated at 13807.00 ft
06:00-07:00
1 hr
Circulated at 13807.00 ft (cont...)
07:00-09:00
2 hr
Circulated at 13807.00 ft
09:00-09:30
1/2 hr
Held safety meeting
09:30-10:30
1 hr
Batch mixed slurry - 67.000 bbl
10:30-12:00
1-1/2 hr
Displaced slurry - 67.000 bbl
12:00-12:30
1/2 hr
Functioned Permanent packer
12:30-13:00
1/2 hr
Reverse circulated at 10059.00 ft
13:00-14:00
1 hr
Pumped out of hole to 8670.00 ft
14:00-15:30
1-1/2 hr
Circulated at 8670.00 ft
15:30-18:30
3 hr
Pumped out of hole to 0.00 ft
18:30-19:30
1 hr
Ran Drillpipe in stands to 3441.00 ft
19:30-22:00
2-1/2 hr
Laid down 3441.00 ft of 3-1/2in OD drill pipe
22:00-04:00
6 hr
Made up BHA no. 14
02 Jun 97 04:00-06:00
2 hr
R.I.H. to 8670.00 ft
06:00-06:30
1/2 hr
R.I.H. to 10059.00 ft (cont...)
r,
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Page 6
Date 27 August 97
Date/Time
Duration
Activity
06:30-07:00
1/2 hr
Circulated at 10059.00 ft
07:00-07:30
1/2 hr
Held drill (Kick (well kill))
07:30-08:00
1/2 hr
Tested Casing - Via annulus
08:00-08:30
1/2 hr
R.I.H. to 10094.00 ft
08:30-09:00
1/2 hr
Drilled cement to 10097.00 ft
09:00-10:00
1 hr
R.I.H. to 12567.00 ft
10:00-10:30
1/2 hr
Laid down 270.00 ft of 3-1/2in OD drill pipe
10:30-15:00
4-1/2 hr
Drilled cement to 12872.00 ft
15:00-21:00
6 hr
Drilled installed equipment - DV collar
21:00-05:00
8 hr
Drilled installed equipment - Landing collar
03 Jun 97
05:00-06:00
1 hr
Circulated at 12940.00 ft
06:00-07:00
1 hr
R.I.H. to 13814.00 ft
07:00-08:30
1-1/2 hr
Circulated at 13800.00 ft
08:30-09:30
1 hr
Laid down 744.00 ft of 3-1/2in OD drill pipe
09:30-13:00
3-1/2 hr
Pulled out of hole to 3971.00 ft
13:00-18:00
5 hr
Laid down 3791.00 ft of 2-7/8in OD drill pipe
18:00-18:30
1/2 hr
Held safety meeting
18:30-20:30
2 hr
Rigged up Logging braided cable equipment
20:30-23:00
2-1/2 hr
Conducted electric cable operations
23:00-00:00
1 hr
Rigged down Wireline units
04 Jun 97
00:00-05:30
5-1/2 hr
Made up BHA no. 1
05:30-06:00
1/2 hr
Pulled BHA
06:00-07:00
1 hr
Downloaded MWD tool
07:00-11:00
4 hr
R.I.H. to 9628.00 ft
11:00-12:30
1-1/2 hr
Logged hole with LWD: Formation evaluation (FE) from 9540.00 ft to
9583.00 ft
12:30-13:00
1/2 hr
R.I.H. to 9774.00 ft
13:00-14:30
1-1/2 hr
Serviced Other sub -surface equipment
14:30-17:00
2-1/2 hr
Worked toolstring at 9750.00 ft
17:00-17:30
1/2 hr
Tested Downhole equipment - Via annulus and string
17:30-04:00
10-1/2 hr
Milled Casing at 9778.00 ft
05 Jun 97
04:00-05:30
1-1/2 hr
Circulated at 9778.00 ft
05:30-06:00
1/2 hr
Pulled out of hole to 9000.00 ft
06:00-08:30
2-1/2 hr
Pulled out of hole to 262.00 ft (cont...)
08:30-10:00
1-1/2 hr
Pulled BHA
10:00-11:00
1 hr
Retrieved Wear bushing
11:00-14:00
3 hr
Tested BOP stack
14:00-14:30
1/2 hr
Installed Wear bushing
14:30-16:00
1-1/2 hr
Made up BHA no. 16
16:00-19:30
3-1/2 hr
R.I.H. to 9778.00 ft
19:30-03:30
8 hr
Drilled to 9873.00 ft
06 Jun 97
03:30-04:30
1 hr
Circulated at 9873.00 ft
04:30-06:00
1-1/2 hr
Pulled out of hole to 7000.00 ft
06:00-08:30
2-1/2 hr
Pulled out of hole to 239.00 ft (cont...)
08:30-09:00
1/2 hr
Pulled BHA
09:00-10:00
1 hr
Made up BHA no. 17
10:00-10:30
1/2 hr
R.I.H. to 2000.00 ft
10:30-11:00
1/2 hr
Serviced Block line
11:00-13:30
2-1/2 hr
R.I.H. to 9711.00 ft
13:30-14:00
1/2 hr
Logged hole with LWD: Formation evaluation (FE) from 9774.00 ft to
9811.00 ft
14:00-06:00
16 hr
Drilled to 10016.00 ft
07 Jun 97
06:00-07:00
1 hr
Drilled to 10042.00 ft (cont...)
07:00-07:30
1/2 hr
Investigated pressure change
rA
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Page 7
Date 27 August 97
Date/Time
Duration
Activity
07:30-12:30
5 hr
Pulled out of hole to 192.00 ft
12:30-12:45
1/4 hr
Removed Wear bushing
12:45-13:00
1/4 hr
Installed Wear bushing
13:00-13:30
1/2 hr
Held safety meeting
13:30-14:30
1 hr
Rig waited: Downhole fish
14:30-15:00
1/2 hr
Made up BHA no. 18
15:00-18:30
3-1/2 hr
R.I.H. to 9849.00 ft
18:30-19:00
1/2 hr
Fished at 9849.00 ft
19:00-23:00
4 hr
Pulled out of hole to 15.00 ft
23:00-00:00
1 hr
Laid down fish
08 Jun 97
00:00-01:00
1 hr
Made up BHA no. 19
01:00-04:00
3 hr
R.I.H. to 9857.00 ft
04:00-04:30
1/2 hr
Fished at 9857.00 ft
04:30-06:00
1-1/2 hr
Pulled out of hole to 7000.00 ft
06:00-09:30
3-1/2 hr
Pulled out of hole to 15.00 ft (cont...)
09:30-10:30
1 hr
Laid down fish
10:30-13:30
3 hr
Made up BHA no. 20
13:30-17:00
3-1/2 hr
R.I.H. to 10042.00 ft
17:00-03:00
10 hr
Drilled to 10414.00 ft
09 Jun 97
03:00-04:00
1 hr
Circulated at 10414.00 ft
04:00-06:00
2 hr
Pulled out of hole to 7000.00 ft
06:00-07:30
1-1/2 hr
Pulled out of hole to 255.00 ft (cont...)
07:30-08:00
1/2 hr
Pulled BHA
08:00-08:30
1/2 hr
Made up BHA no. 21
08:30-12:00
3-1/2 hr
R.I.H. to 10340.00 ft
12:00-12:30
1/2 hr
Logged hole with LWD: Formation evaluation (FE) from 10340.00 ft to
10414.00 ft
12:30-13:30
1 hr
Drilled to 10426.00 ft
13:30-14:30
1 hr
Functioned Drilling tool / logs
14:30-22:00
7-1/2 hr
Drilled to 10765.00 ft
22:00-23:00
1 hr
Circulated at 10765.00 ft
23:00-02:30
3-1/2 hr
Pulled out of hole to 223.00 ft
10 Jun 97
02:30-04:00
1-1/2 hr
Pulled BHA
04:00-04:30
1/2 hr
Made up BHA no. 22
04:30-06:00
1-1/2 hr
R.I.H. to 5000.00 ft
06:00-07:00
1 hr
R.I.H. to 10765.00 ft (cont...)
07:00-06:00
23 hr
Drilled to 11750.00 ft
11 Jun 97
06:00-16:00
10 hr
Drilled to 12069.00 ft (cont...)
16:00-17:30
1-1 /2 hr
Circulated at 12069.00 ft
17:30-21:30
4 hr
Pulled out of hole to 100.00 ft
21:30-22:00
1/2 hr
Pulled BHA
22:00-23:00
1 hr
Rigged up High pressure lines
23:00-02:00
3 hr
Tested BOP stack
12 Jun 97
02:00-02:30
1/2 hr
Made up BHA no. 23
02:30-04:00
1-1/2 hr
R.I.H. to 6000.00 ft
04:00-05:00
1 hr
Serviced Block line
05:00-06:00
1 hr
R.I.H. to 8000.00 ft
06:00-07:30
1-1/2 hr
R.I.H. to 12069.00 ft (cont...)
07:30-01:00
17-1/2 hr
Drilled to 12452.00 ft
13 Jun 97
01:00-01:30
1/2 hr
Took MWD survey at 12452.00 ft
01:30-06:00
4-1/2 hr
Drilled to 12524.00 ft
06:00-07:30
1-1/2 hr
Drilled to 12705.00 ft (cont...)
07:30-09:00
1-1 /2 hr
Circulated at 12705.00 ft
09:00-01:30
16-1/2 hr
Pulled out of hole to 12705.00 ft
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Page 8
Date 27 August 97
Date/Time
Duration
Activity
14 Jun 97
01:30-02:30
1 hr
Pulled BHA
02:30-04:00
1-1/2 hr
Made up BHA no. 24
04:00-06:00
2 hr
R.I.H. to 6000.00 ft
06:00-08:00
2 hr
R.I.H. to 12705.00 ft (cont...)
08:00-19:30
11-1/2 hr
Drilled to 12888.00 ft
19:30-00:30
5 hr
Pulled out of hole to 100.00 ft
15 Jun 97
00:30-01:00
1/2 hr
Pulled BHA
01:00-02:00
1 hr
Made up BHA no. 24
02:00-05:00
3 hr
R.I.H. to 12888.00 ft
05:00-06:00
1 hr
Took MWD survey at 12713.00 ft
06:00-08:00
2 hr
Took MWD survey at 12713.00 ft (cont...)
08:00-06:00
22 hr
Drilled to 13640.00 ft
16 Jun 97
06:00-17:00
11 hr
Drilled to 14014.00 ft (cont...)
17:00-18:00
1 hr
Circulated at 14014.00 ft
18:00-20:00
2 hr
Drilled to 14061.00 ft
20:00-21:30
1-1/2 hr
Circulated at 14061.00 ft
21:30-00:30
3 hr
Pulled out of hole to 9740.00 ft
17 Jun 97
00:30-02:30
2 hr
R.I.H. to 14000.00 ft
02:30-04:30
2 hr
Circulated at 14000.00 ft
04:30-06:00
1-1/2 hr
Pulled out of hole to 13300.00 ft
06:00-13:00
7 hr
Pulled out of hole to 100.00 ft (cont...)
13:00-14:00
1 hr
Pulled BHA
14:00-14:30
1/2 hr
Removed Bore protector
14:30-18:00
3-1/2 hr
Ran Liner to 4161.00 ft (4-1/2in OD)
18:00-22:30
4-1/2 hr
Ran Tubing to 4121.00 ft (2-1/16in OD)
22:30-01:30
3 hr
Ran Drillpipe in stands to 9750.00 ft
18 Jun 97
01:30-02:00
1/2 hr
Circulated at 9750.00 ft
02:00-03:30
1-1/2 hr
Ran Liner to 13945.00 ft (4-1/2in OD)
03:30-06:00
2-1/2 hr
Circulated at 13945.00 ft
06:00-07:00
1 hr
Circulated at 13945.00 ft (cont...)
07:00-08:30
1-1/2 hr
Pulled Drillpipe in stands to 9755.00 ft
08:30-13:00
4-1/2 hr
Circulated at 9755.00 ft
13:00-15:00
2 hr
Pulled Drillpipe in stands to 4161.00 ft
15:00-06:00
15 hr
Laid down 4120.00 ft of Tubing
19 Jun 97
01:30-03:30
2 hr
R.I.H. to 9670.00 ft
03:30-05:30
2 hr
Logged hole with LWD: Formation evaluation (FE) from 9552.00 ft to
9585.00 ft
05:30-06:00
1/2 hr
Took MWD survey at 9731.00 ft
06:00-09:30
3-1/2 hr
Took MWD survey at 9731.00 ft (cont...)
09:30-12:00
2-1/2 hr
Fished at 9753.00 ft
12:00-13:00
1 hr
Fished at 9753.00 ft
13:00-14:30
1-1/2 hr
Fished at 9753.00 ft
14:30-18:00
3-1/2 hr
Pulled out of hole to 954.00 ft
18:00-18:30
1/2 hr
Pulled BHA
18:30-22:00
3-1/2 hr
Tested BOP stack
22:00-23:00
1 hr
Made up BHA no. 27
23:00-02:00
3 hr
R.I.H. to 9749.00 ft
20 Jun 97
02:00-03:30
1-1/2 hr
Circulated at 9761.00 ft
03:30-06:00
2-1/2 hr
Pulled out of hole to 0.00 ft
06:00-11:00
5 hr
R.I.H. to 9730.00 ft
11:00-13:00
2 hr
Fished at 9753.00 ft
13:00-16:00
3 hr
Pulled out of hole to 900.00 ft
16:00-18:00
2 hr
Pulled BHA
18:00-19:30
1-1/2 hr
Made up BHA no. 28
Facility PB S Pad
Progress Report
Well S-43
Rig Nabors 18E
Page 9
Date 27 August 97
Date/Time
Duration
Activity
19:30-22:00
2-1/2 hr
R.I.H. to 9808.00 ft
22:00-00:00
2 hr
Circulated at 9808.00 ft
21 Jun 97 00:00-06:00
6 hr
Laid down 6500.00 ft of 3-1/2in OD drill pipe
06:00-07:00
1 hr
Laid down 9700.00 ft of 3-1/2in OD drill pipe (cont...)
07:00-08:00
1 hr
Tested Top ram
08:00-09:30
1-1/2 hr
Rigged up Tubing handling equipment
09:30-18:00
8-1/2 hr
Ran Tubing to 6800.00 ft (4-1/2in OD)
18:00-19:00
1 hr
Installed SCSSSV control line
19:00-20:30
1-1/2 hr
Ran Tubing to 9088.00 ft (4-1/2in OD)
20:30-22:30
2 hr
Installed Tubing hanger
22:30-00:30
2 hr
Reverse circulated at 9088.00 ft
22 Jun 97 00:30-02:30
2 hr
Set packer at 9089.00 ft with 2800.0 psi
02:30-04:30
2 hr
Removed BOP stack
04:30-06:00
1-1/2 hr
Installed Xmas tree
06:00-07:00
1 hr
Installed Xmas tree (cont...)
07:00-08:00
1 hr
Removed Hanger plug
08:00-13:00
5 hr
Freeze protect well - 75.000 bbl of Diesel
Alaska
Client :
BP Exploration
Field :
Prudhoe Bay
Well name:
S 43-L1
Permanent datum :
MSL
Depth measured from:
KB, 68.1 FT
Elevation of kelly bushing :
68.1 FT
Elevation of rig floor :
66.6 FT
Elevation of ground level :
37.2 FT
Magnetic declination :
28.3 DEG
Grid convergence :
0 DEG
Total correction :
28.3 DEG
TIE IN POINT
MWD
Measured depth :
0 FT
True vertical depth :
0 FT
NIS disp (-ve for S)
0 FT
ENV disp (-ve for W)
0 FT
Spud date : 05/03/97
Last survey date : 06/16/97
Inclination : 0
Azimuth : 0
Azimuth from rotary table:
to the target 47.4
oS 3
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Displacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100f
Survey
tool
e
+N/S-
ft
+E/W-
ft
1 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TIP
2 155.85
0.54
324.40
155.90
155.90
0.49
0.60
-0.43
0.73
324.40
0.35
MWD
3 258.85
0.75
326.00
103.00
258.89
1.28
1.55
-1.09
1.89
324.97
0.20
MWD M
4 343.33
0.76
328.10
84.40
343.28
2.05
2.48
-1.69
3.01
325.74
0.03
MWD
5 434.52
0.85
348.90
91.20
434.47
3.10
3.66
-2.14
4.24
329.67
0.33
MWD
6 525.24
0.65
9.80
90.70
525.17
4.23
4.83
-2.18
5.30
335.67
0.37
MWD
7 617.58
1.12
30.10
92.40
617.56
5.62
6.13
-1.64
6.34
345.00
0.60
MWD
8 712.34
1.28
35.00
94.70
712.24
7.48
7.79
-0.57
7.81
355.81
0.20
MWD
9 805.13
1.32
34.20
92.80
805.01
9.43
9.53
0.62
9.55
3.75
0.05
MWD
10 897.82
1.30
46.10
92.70
897.69
11.30
11.14
1.98
11.31
10.09
0.29
MWD
11 990.01
1.11
62.40
92.20
989.87
12.75
12.28
3.53
12.77
16.03
0.42
MWD
12 1083.55
0.80
103.10
93.60
1083.46
13.33
12.55
4.97
13.50
21.59
0.77
MWD
13 1175.62
1.43
123.60
92.00
1175.44
12.92
11.77
6.55
13.47
29.10
0.80
MWD
14 1269.01
1.76
137.50
93.40
1268.80
11.68
10.07
8.49
13.17
40.14
0.54
MWD
15 1364.37
2.12
138.30
95.40
1364.15
9.81
7.67
10.65
13.13
54.25
0.38
MWD
16 1457.30
2.36
139.00
92.90
1456.98
7.68
4.94
13.05
13.95
69.26
0.26
MWD
17 1550.01
2.73
123.20
92.70
1549.59
5.77
2.29
16.15
16.31
81.92
0.85
MWD
18 1644.87
4.75
107.00
94.90
1644.28
4.68
-0.09
21.80
21.80
90.25
2.38
MWD
19 1738.09
7.67
98.70
93.20
1736.93
4.81
-2.16
31.64
31.71
93.91
3.27
MWD
20 1831.66
10.61
95.70
93.60
1829.33
6.28
-3.96
46.39
46.56
94.88
3.18
MWD
S 43 L1 ORIGINAL
Final surveys 6/19/97
Page 1
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Displacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100f
y
je
+N/S-
ft
+E/W-
ft
21
1924.97
11.53
92.90
93.30
1920.89
8.89
-5.29
64.25
64.47
94.71
1.14
MWD
22
2018.89
12.62
92.10
93.90
2012.71
12.35
-6.14
83.88
84.10
94.19
1.17
MWD
23
2113.84
14.32
92.30
94.90
2105.00
16.35
-6.99
105.96
106.19
93.77
1.79
MWD
24
2208.27
15.66
89.90
94.50
2196.28
21.25
-7.44
130.40
130.61
93.26
1.56
MWD
25
2300.15
15.52
90.90
91.90
2284.80
26.49
-7.61
155.09
155.28
92.81
0.33
MWD
26
2392.67
17.10
89.20
92.50
2373.58
32.16
-7.61
181.07
181.23
92.41
1.78
MWD
27
2486.92
18.43
90.40
94.20
2463.28
38.53
-7.52
209.81
209.94
92.05
1.46
MWD
28
2581.72
18.74
91.40
94.80
2553.14
44.67
-8.00
240.02
240.15
91.91
0.47
MWD
29
2675.45
18.83
91.30
93.80
2641.94
50.58
-8.71
270.21
270.35
91.85
0.10
MWD
30
2772.79
18.73
88.80
97.30
2734.06
57.40
-8.74
301.53
301.66
91.66
0.83
MWD
31
2865.85
17.50
87.10
93.10
2822.55
64.72
-7.72
330.46
330.55
91.34
1.44
MWD
32
2958.25
17.56
87.10
92.30
2910.56
72.17
-6.31
358.22
358.28
91.01
0.07
MWD
33
3052.43
18.03
87.90
94.20
3000.25
79.68
-5.06
386.98
387.01
90.75
0.56
MWD
34
3076.17
17.92
87.50
23.80
3022.89
81.57
4.77
394.32
394.35
90.69
0.69
MWD
35
3140.40
17.57
88.00
64.20
3084.04
86.59
-4.00
413.87
413.89
90.55
0.59
MWD M
36
3235.11
18.84
88.90
94.70
3174.00
93.83
-3.20
443.45
443.46
90.41
1.37
MWD
37
3266.86
18.85
88.90
31.80
3204.09
96.27
-3.01
453.72
453.73
90.38
0.03
MWD
38
3361.92
18.55
89.80
95.00
3294.08
103.27
-2.66
484.17
484.18
90.31
0.44
MWD
39
3454.85
18.21
90.40
93.00
3382.33
109.63
-2.71
513.50
513.50
90.30
0.42
MWD
40
3547.66
17.90
89.90
92.80
3470.56
115.85
-2.79
542.26
542.26
90.29
0.37
MWD
41
3641.45
17.49
90.10
93.70
3559.83
122.08
-2.79
570.74
570.74
90.28
0.44
MWD
42
3736.40
17.58
92.70
95.00
3650.42
127.65
-3.49
599.34
599.35
90.33
0.83
MWD
43
3829.16
17.34
95.00
92.80
3738.94
131.90
-5.35
627.12
627.14
90.49
0.79
MWD
44
3920.56
16.92
95.10
91.40
3826.29
135.45
-7.72
653.94
653.98
90.68
0.46
MWD
45
4013.10
18.07
94.20
92.50
3914.51
139.32
-9.97
681.65
681.72
90.84
1.28
MWD
46
4106.97
18.12
96.00
93.90
4003.76
143.14
-12.56
710.70
710.81
91.01
0.60
MWD
47
4202.02
18.59
90.30
95.00
4093.94
148.08
-14.18
740.53
740.67
91.10
1.95
MWD
48
4297.44
18.49
88.90
95.40
4184.39
154.92
-13.97
770.86
770.99
91.04
0.48
MWD
49
4392.20
18.57
89.80
94.80
4274.27
161.84
-13.63
800.99
801.11
90.98
0.31
MWD
50
4486.13
18.09
90.40
93.90
4363.41
168.25
-13.68
830.52
830.63
90.94
0.55
MWD
51
4579.21
17.59
91.30
93.10
4452.03
174.07
-14.10
859.04
859.15
90.94
0.61
MWD
52
4672.22
19.15
94.00
93.00
4540.29
179.12
-15.49
888.31
888.44
91.00
1.91
MWD
53
4765.66
18.74
94.50
93.50
4628.73
183.55
-17.73
918.58
918.75
91.11
0.47
MWD
54
4859.03
18.21
96.70
93.30
4717.22
187.17
-20.61
948.00
948.22
91.25
0.94
MWD
55
4951.28
18.22
96.70
92.30
4804.89
190.15
-23.98
976.65
976.95
91.41
0.01
MWD
56
5046.30
17.98
94.90
95.00
4895.19
193.66
-26.96
1006.01
1006.37
91.54
0.64
MWD
57
5138.08
18.23
93.70
91.80
4982.45
197.79
-29.10
1034.46
1034.87
91.61
0.49
MWD
58
5232.22
18.12
93.80
94.10
5071.85
202.33
-31.02
1063.75
1064.20
91.67
0.12
MWD
59
5325.12
19.23
91.30
92.90
5159.86
207.55
-32.32
1093.46
1093.94
91.69
1.47
MWD
60
5426.04
19.03
89.40
100.90
5255.19
214.58
-32.53
1126.52
1126.99
91.65
0.65
MWD
S 43 L1
Final surveys 6/19/97 Page 2
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Displacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100f
Survey
tool
e
+N/S-
ft
+E/W-
ft
61
5521.28
18.88
89.90
95.30
5345.32
221.53
-32.34
1157.47
1157.93
91.60
0.23
MWD
62
5614.92
18.93
88.80
93.60
5433.87
228.50
-31.99
1187.80
1188.23
91.54
0.38
MWD
63
5708.52
18.86
89.10
93.60
5522.43
235.67
-31.44
1218.10
1218.51
91.48
0.13
MWD
64
5804.45
19.01
88.80
95.90
5613.14
243.03
-30.87
1249.22
1249.60
91.42
0.19
MWD
65
5897.69
19.13
88.80
93.30
5701.32
250.31
-30.23
1279.69
1280.05
91.35
0.13
MWD
66
5992.08
19.18
87.80
94.40
5790.50
257.98
-29.31
1310.65
1310.98
91.28
0.35
MWD
67
6086.72
19.04
90.70
94.60
5879.88
265.15
-28.90
1341.61
1341.92
91.23
1.01
MWD
68
6180.16
19.06
91.40
93.50
5968.26
271.27
-29.46
1372.12
1372.44
91.23
0.25
MWD
69
6274.00
19.33
91.50
93.80
6056.85
277.25
-30.24
1402.95
1403.28
91.23
0.29
MWD
70
6367.02
18.01
84.80
93.00
6144.96
284.63
-29.34
1432.66
1432.96
91.17
2.71
MWD
71
6462.72
17.84
84.70
95.70
6236.02
293.67
-26.65
1461.99
1462.24
91.04
0.18
MWD
72
6556.21
18.12
87.00
93.50
6324.95
302.00
-24.56
1490.77
1490.98
90.94
0.82
MWD
73
6649.62
17.88
88.10
93.40
6413.78
309.51
-23.33
1519.61
1519.79
90.88
0.45
MWD
74
6741.45
17.95
86.90
91.80
6501.13
316.88
-22.09
1547.82
1547.98
90.82
0.41
MWD
75
6834.56
18.26
91.50
93.20
6589.72
323.59
-21.70
1576.76
1576.91
90.79
1.57
MWD
76
6928.64
18.36
94.40
94.00
6678.96
328.55
-23.22
1606.24
1606.41
90.83
0.97
MWD
77
7021.41
18.35
106.30
92.80
6767.07
329.71
-28.44
1634.84
1635.09
91.00
4.03
MWD
78
7113.36
18.23
102.90
92.00
6854.43
328.71
-35.72
1662.77
1663.15
91.23
1.17
MWD
79
7208.16
18.14
102.50
94.80
6944.49
328.68
-42.23
1691.63
1692.16
91.43
0.16
MWD
80
7302.29
18.33
102.00
94.10
7033.87
328.87
-48.47
1720.41
1721.09
91.61
0.26
MWD
81
7397.06
18.01
102.00
94.80
7123.94
329.20
-54.62
1749.32
1750.18
91.79
0.34
MWD
82
7492.17
17.70
103.60
95.10
7214.46
329.12
-61.08
1777.76
1778.80
91.97
0.61
MWD
83
7584.60
17.59
103.60
92.40
7302.51
328.64
-67.66
1804.98
1806.25
92.15
0.12
MWD
84
7678.22
17.70
102.60
93.60
7391.71
328.41
-74.09
1832.61
1834.11
92.32
0.34
MWD
85
7773.83
17.42
102.80
95.60
7482.85
328.37
-80.43
1860.75
1862.49
92.48
0.30
MWD
86
7867.95
18.86
101.40
94.10
7572.28
328.66
-86.56
1889.39
1891.38
92.62
1.60
MWD
87
7961.13
19.98
101.30
93.20
7660.17
329.35
-92.66
1919.78
1922.01
92.76
1.20
MWD
88
8056.03
20.30
101.80
94.90
7749.27
329.97
-99.20
1951.79
1954.31
92.91
0.38
MWD
89
8148.91
20.68
101.80
92.90
7836.29
330.44
-105.85
1983.62
1986.44
93.05
0.41
MWD
90
8242.59
20.47
102.70
93.70
7924.01
330.66
-112.84
2015.80
2018.96
93.20
0.41
MWD
91
8337.15
19.95
102.50
94.50
8012.70
330.67
-119.96
2047.66
2051.17
93.35
0.56
MWD
92
8397.27
19.89
102.00
60.20
8069.29
330.81
-124.31
2067.70
2071.44
93.44
0.30
MWD
93
8491.24
20.20
100.40
93.90
8157.51
331.62
-130.56
2099.27
2103.33
93.56
0.67
MWD
94
8523.01
22.78
96.70
31.80
8187.10
332.47
-132.27
2110.79
2114.93
93.59
9.16
MWD
95
8554.74
25.98
92.40
31.70
8215.97
334.33
-133.27
2123.83
2128.00
93.59
11.54
MWD
96
8585.91
28.93
90.20
31.20
8243.65
337.17
-133.59
2138.20
2142.37
93.57
10.00
MWD
97
8618.38
31.54
87.00
32.50
8271.73
341.16
-133.17
2154.56
2158.67
93.54
9.44
MWD
98
8649.31
33.36
84.10
30.90
8297.80
346.03
-131.87
2171.08
2175.08
93.48
7.75
MWD
99
8680.50
35.12
80.40
31.20
8323.60
352.16
-129.49
2188.47
2192.29
93.39
8.74
MWD
100
8710.99
36.30
79.60
30.50
8348.36
359.01
-126.40
2206.00
2209.62
93.28
4.16
MWD
S 43 L1
Final surveys 6/19/97 Page 3
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Dis lacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100f
Survey
tool
e
+N/S-
ft
+E/W-
ft
101
8742.03
37.29
78.80
31.00
8373.19
366.39
-122.92
2224.24
2227.63
93.16
3.55
MWD
102
8772.63
39.62
75.80
30.60
8397.15
374.54
-118.73
2242.79
2245.93
93.03
9.75
MWD
103
8803.59
42.68
73.20
31.00
8420.49
384.17
-113.26
2262.44
2265.27
92.87
11.31
MWD
104
8833.21
45.20
71.00
29.60
8441.81
394.61
-106.94
2281.98
2284.48
92.68
9.95
MWD
105
8864.59
47.28
71.10
31.40
8463.52
406.48
-99.58
2303.42
2305.58
92.48
6.63
MWD
106
8894.57
49.95
70.40
30.00
8483.35
418.37
-92.16
2324.67
2326.50
92.27
9.07
MWD
107
8925.06
53.17
70.00
30.50
8502.31
431.18
-84.06
2347.15
2348.65
92.05
10.61
MWD
108
8957.08
56.55
68.80
32.00
8520.73
445.53
-74.85
2371.63
2372.81
91.81
11.00
MWD
109
8988.99
59.34
67.80
31.90
8537.66
460.78
-64.85
2396.75
2397.63
91.55
9.14
MWD
110
9020.51
61.65
66.20
31.50
8553.17
476.75
-54.14
2421.98
2422.59
91.28
8.56
MWD
111
9052.42
63.03
67.20
31.90
8567.98
493.33
-42.96
2447.93
2448.31
91.01
5.14
MWD
112
9083.95
63.31
65.40
31.50
8582.20
509.98
-31.67
2473.67
2473.87
90.73
5.18
MWD
113
9114.63
64.28
65.70
30.70
8595.76
526.58
-20.27
2498.74
2498.82
90.46
3.28
MWD
114
9145.88
66.03
66.10
31.30
8608.91
543.57
-8.67
2524.67
2524.68
90.20
5.71
MWD
115
9177.09
66.12
66.50
31.20
8621.56
560.47
2.79
2550.78
2550.78
89.94
1.21
MWD
116
9207.39
66.10
65.20
30.30
8633.83
577.05
14.13
2576.06
2576.10
89.69
3.92
MWD
117
9239.16
66.19
64.90
31.80
8646.69
594.79
26.40
2602.43
2602.56
89.42
0.91
MWD
118
9271.08
66.39
64.80
31.90
8659.52
612.68
38.81
2628.87
2629.15
89.15
0.69
MWD
119
9301.32
66.41
65.30
30.20
8671.61
629.56
50.48
2653.96
2654.44
88.91
1.52
MWD
120
9332.59
66.52
64.80
31.30
8684.11
647.06
62.59
2679.98
2680.71
88.66
1.51
MWD
121
9362.26
66.70
63.90
29.70
8695.90
663.95
74.39
2704.55
2705.57
88.42
2.85
MWD
122
9393.96
66.92
62.90
31.70
8708.38
682.38
87.43
2730.60
2732.00
88.17
2.98
MWD
123
9427.67
67.00
63.40
33.70
8721.57
702.09
101.44
2758.27
2760.14
87.89
1.39
MWD
124
9458.60
66.96
63.60
30.90
8733.66
720.04
114.13
2783.72
2786.06
87.65
0.61
MWD
125
9490.20
65.03
62.30
31.60
8746.51
738.47
127.26
2809.43
2812.31
87.41
7.17
MWD
126
9522.06
64.63
62.10
31.90
8760.08
757.19
140.72
2834.97
2838.46
87.16
1.38
MWD
127
9553.35
64.64
63.20
31.20
8773.44
775.31
153.67
2860.01
2864.14
86.92
3.19
MWD
128
9584.66
64.80
63.40
31.40
8786.85
793.30
166.43
2885.38
2890.17
86.70
0.77
MWD
129
9615.74
64.87
63.30
31.00
8800.04
811.07
179.01
2910.45
2915.95
86.48
0.37
MWD
130
9647.66
63.85
64.20
32.00
8813.88
829.17
191.77
2936.33
2942.58
86.26
4.07
MWD
131
9678.73
61.23
64.00
31.00
8828.18
846.31
203.79
2961.07
2968.07
86.06
8.47
MWD
132
9709.65
60.70
64.20
31.00
8843.22
863.19
215.63
2985.45
2993.23
85.87
1.80
MWD
133
9741.27
60.53
64.60
31.60
8858.73
880.23
227.52
3010.28
3018.87
85.68
1.23
MWD
134
9761.90
61.33
63.70
20.60
8868.74
891.45
235.39
3026.48
3035.62
85.55
5.75
MWD M
135
9778.11
61.43
62.90
16.20
8876.50
900.47
241.79
3039.18
3048.78
85.45
3.84
MWD M
136
9793.43
63.89
62.20
15.30
8883.52
909.22
248.06
3051.24
3061.30
85.35
16.58
MWD M
137
9811.73
61.40
18.30
8890.93
920.16
255.96
3065.98
3076.64
85.23
24.70
MWD M
138
9825.37
72.67
60.70
13.70
8895.50
928.73
262.21
3077.28
3088.43
85.13
31.90
MWD M
139
9839.54
77.70
60.10
14.10
8899.10
937.89
268.95
3089.12
3100.81
85.02
35.91
MWD M
140
9864.09
86.90
58.90
24.60
8902.40
954.54
281.31
3110.10
3122.80
84.83
37.71
MWD
S43L1
Final surveys 6/19/97 Page 4
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Dis lacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100
Survey
tool
e
+N/S-
ft
+E/W-
ft
141
9896.42
92.02
56.50
32.30
8902.70
977.34
298.56
3137.40
3151.57
84.56
17.50
MWD
142
9926.94
94.30
51.40
30.50
8901.02
1000.20
316.47
3162.01
3177.81
84.28
18.29
MWD
143
9958.59
95.05
47.10
31.70
8898.43
1025.57
337.11
3185.92
3203.70
83.96
14.04
MWD
144
9990.00
96.00
47.40
31.40
8895.41
1051.30
358.35
3208.85
3228.80
83.63
3.28
MWD
145
10009.55
96.90
46.70
19.60
8893.21
1067.37
371.62
3223.11
3244.46
83.42
5.80
MWD
146
10041.89
96.70
43.80
32.30
8889.38
1094.38
394.19
3245.88
3269.73
83.08
8.94
MWD
147
10073.20
95.35
44.90
31.30
8886.10
1120.86
416.45
3267.64
3294.07
82.74
5.55
MWD
148
10105.14
92.70
45.20
31.90
8883.86
1147.72
438.93
3290.16
3319.31
82.40
8.36
MWD
149
10137.18
91.30
44.90
32.10
8882.74
1174.80
461.59
3312.86
3344.86
82.07
4.46
MWD
150
10169.36
91.45
45.20
32.20
8881.97
1201.97
484.34
3335.64
3370.62
81.74
1.04
MWD
151
10201.10 '
91.40
45.20
31.70
8881.18
1228.68
506.67
3358.13
3396.14
81.42
0.16
MWD
152
10233.32
91.35
44.90
32.20
8880.41
1255.85
529.41
3380.91
3422.11
81.10
0.94
MWD
153
10265.71
90.75
44.20
32.40
8879.81
1283.34
552.49
3403.64
3448.19
80.78
2.85
MWD
154
10296.36
90.80
44.20
30.70
8879.40
1309.50
574.50
3425.04
3472.89
80.48
0.16
MWD
155
10328.11
90.05
44.20
31.70
8879.16
1336.51
597.23
3447.14
3498.49
80.17
2.37
MWD
156
10360.25
90.10
43.40
32.20
8879.12
1364.06
620.47
3469.42
3524.47
79.86
2.49
MWD
157
10391.01
90.30
43.50
30.70
8879.01
1390.44
642.77
3490.52
3549.21
79.57
0.65
MWD
158
10423.31
90.75
43.80
32.30
8878.72
1418.13
666.16
3512.79
3575.40
79.26
1.86
MWD
159
10455.19
92.10
43.50
31.90
8877.92
1445.47
689.26
3534.78
3601.36
78.97
4.41
MWD
160
10487.34
91.75
43.10
32.10
8876.84
1473.08
712.62
3556.76
3627.45
78.67
1.44
MWD
161
10519.96
91.60
43.10
32.70
8875.89
1501.25
736.49
3579.10
3654.09
78.37
0.46
MWD
162
10551.93
91.60
43.10
31.90
8875.00
1528.74
759.77
3600.89
3680.17
78.09
0.00
MWD
163
10584.23
91.55
43.10
32.30
8874.11
1556.57
783.35
3622.95
3706.67
77.80
0.15
MWD
164
10615.87
91.55
43.80
31.70
8873.25
1583.78
806.35
3644.74
3732.87
77.52
2.21
MWD
165
10647.73
91.45
45.20
31.80
8872.42
1610.77
829.03
3667.02
3759.56
77.26
4.41
MWD
166
10679.90
91.45
44.20
32.20
8871.61
1638.05
851.91
3689.66
3786.73
77.00
3.10
MWD
167
10713.46
91.35
44.50
33.60
8870.79
1666.62
875.93
3713.14
3815.06
76.73
0.94
MWD M
168
10743.02
91.40
46.30
29.50
8870.08
1691.42
896.63
3734.14
3840.28
76.50
6.10
MWD M
169
10774.27
91.15
45.20
31.30
8869.38
1717.63
918.47
3756.56
3867.21
76.26
3.60
MWD
170
10806.71
90.95
45.60
32.40
8868.79
1744.87
941.21
3779.62
3895.05
76.02
1.38
MWD M
171
10838.85
89.70
44.90
32.10
8868.61
1771.90
963.81
3802.42
3922.67
75.78
4.46
MWD
172
10871.32
88.95
42.70
32.50
8868.99
1799.71
987.26
3824.91
3950.27
75.53
7.15
MWD
173
10903.40
88.65
40.90
32.10
8869.66
1827.73
1011.19
3846.30
3977.00
75.27
5.68
MWD
174
10935.39
88.95
39.10
32.00
8870.33
1856.14
1035.70
3866.86
4003.16
75.01
5.70
MWD
175
10967.24
89.50
37.30
31.80
8870.76
1884.82
1060.68
3886.53
4028.66
74.74
5.92
MWD
176
10999.14
89.70
35.20
31.90
8870.98
1914.05
1086.41
3905.39
4053.68
74.45
6.61
MWD
177
11030.85
89.50
32.60
31.70
8871.20
1943.58
1112.71
3923.07
4077.81
74.16
8.23
MWD
178
11063.09
89.35
31.60
32.30
8871.53
1974.03
1140.07
3940.23
4101.85
73.86
3.13
MWD
179
11094.58
89.70
30.10
31.50
8871.79
2003.95
1167.12
3956.38
4124.94
73.56
4.89
MWD
180
11126.80
90.20
29.80
32.20
8871.82
2034.69
1195.02
3972.46
4148.31
73.26
1.81
MWD
S 43 L1
Final surveys 6/19/97 Page 5
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Dis lacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100f
Survey
tool
e
+N/S-
ft
+E/W-
ft
181
11158.21
90.65
29.00
31.40
8871.58
2064.76
1222.37
3987.87
4171.01
72.96
2.92
MWD
182
11188.47
91.65
27.30
30.30
8870.98
2093.94
1249.08
4002.16
4192.55
72.67
6.51
MWD
183
11219.86
92.05
27.60
31.40
8869.96
2124.28
1276.93
4016.63
4214.72
72.36
1.59
MWD
184
11251.94
90.60
27.60
32.00
8869.22
2155.19
1305.28
4031.45
4237.49
72.06
4.53
MWD
185
11284.06
88.75
27.60
32.20
8869.40
2186.29
1333.81
4046.37
4260.53
71.76
5.75
MWD
186
11315.99
87.65
27.60
31.90
8870.41
2217.10
1362.07
4061.14
4283.47
71.46
3.45
MWD
187
11347.65
87.55
27.60
31.60
8871.73
2247.60
1390.05
4075.77
4306.29
71.17
0.32
MWD
188
11379.72
87.50
26.90
32.10
8873.12
2278.63
1418.56
4090.45
4329.44
70.87
2.18
MWD
189
11411.35
87.10
26.90
31.70
8874.61
2309.32
1446.80
4104.78
4352.29
70.58
1.26
MWD
190
11442.77
86.85
26.50
31.40
8876.27
2339.73
1474.81
4118.87
4374.94
70.30
1.50
MWD
191
11474.28
86.85
26.50
31.50
8878.00
2370.27
1502.96
4132.90
4397.70
70.02
0.00
MWD
192
11505.94
87.80
26.20
31.60
8879.47
2400.93
1531.24
4146.91
4420.59
69.73
3.15
MWD
193
11537.48
88.65
25.80
31.60
8880.45
2431.66
1559.63
4160.76
4443.46
69.45
2.97
MWD
194
11569.53
89.70
24.40
32.00
8880.91
2462.90
1588.61
4174.33
4466.40
69.16
5.47
MWD
195
11601.08
89.80
24.40
31.60
8881.05
2493.84
1617.38
4187.38
4488.89
68.88
0.32
MWD
196
11631.38
90.80
24.70
30.30
8880.89
2523.48
1644.94
4199.97
4510.61
68.61
3.45
MWD
197
11663.14
91.90
25.10
31.70
8880.14
2554.45
1673.69
4213.31
4533.57
68.34
3.69
MWD
198
11695.01
92.30
25.10
31.90
8878.97
2585.57
1702.56
4226.84
4556.85
68.06
1.25
MWD
199
11726.52
92.70
25.10
31.50
8877.60
2616.30
1731.06
4240.19
4579.93
67.79
1.27
MWD
200
11758.11
91.85
24.40
31.60
8876.35
2647.17
1759.73
4253.41
4603.05
67.52
3.48
MWD
201
11790.01
89.45
22.90
31.90
8875.98
2678.48
1788.95
4266.20
4626.10
67.25
8.87
MWD
202
11821.94
88.55
21.80
31.90
8876.54
2709.92
1818.44
4278.33
4648.75
66.97
4.45
MWD
203
11853.71
89.00
22.20
31.80
8877.22
2741.28
1847.92
4290.24
4671.29
66.70
1.89
MWD
204
11885.77
89.90
22.60
32.10
8877.53
2772.92
1877.60
4302.47
4694.32
66.42
3.07
MWD
205
11917.67
90.90
22.60
31.90
8877.31
2804.33
1907.05
4314.73
4717.38
66.16
3.13
MWD
206
11949.93
90.25
20.40
32.20
8876.98
2836.15
1937.00
4326.53
4740.34
65.88
7.12
MWD
207
11981.43
90.10
19.70
31.50
8876.89
2867.38
1966.59
4337.33
4762.34
65.61
2.27
MWD
208
12013.29
90.50
20.00
31.90
8876.72
2899.03
1996.60
4348.16
4784.65
65.34
1.57
MWD
209
12045.95
89.95
19.70
32.70
8876.59
2931.47
2027.35
4359.26
4807.63
65.06
1.92
MWD
210
12077.60
89.40
16.10
31.60
8876.77
2962.93
2057.42
4368.97
4829.17
64.78
11.52
MWD
211
12109.41
88.85
12.80
31.80
8877.26
2994.71
2088.21
4376.91
4849.53
64.49
10.52
MWD
212
12140.96
88.95
10.30
31.60
8877.86
3026.29
2119.16
4383.23
4868.63
64.20
7.92
MWD
213
12172.92
87.55
7.10
31.90
8878.84
3058.10
2150.67
4388.05
4886.76
63.89
10.94
MWD M
214
12205.28
86.40
3.80
32.40
8880.55
3090.19
2182.87
4391.13
4903.77
63.57
10.77
MWD M
215
12237.08
86.05
0.30
31.80
8882.64
3121.37
2214.58
4392.23
4918.95
63.24
11.35
MWD
216
12268.84
87.25
359.90
31.70
8884.50
3152.26
2246.23
4392.26
4933.30
62.91
3.90
MWD
217
12300.36
89.90
359.20
31.60
8885.28
3183.03
2277.81
4392.01
4947.55
62.59
8.67
MWD
218
12332.44
91.70
358.50
32.00
8884.83
3214.09
2309.80
4391.34
4961.76
62.26
6.16
MWD
219
12364.31
91.65
359.20
31.90
8883.90
3245.06
2341.68
4390.68
4976.09
61.93
2.51
MWD
220
12395.57
91.35
357.70
31.30
8883.08
3275.39
2372.96
4389.83
4990.14
61.61
4.89
MWD
S 43 L1
Final surveys 6/19/97 Page 6
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Dis lacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100f
Survey
tool
e
+N/S-
ft
+E/W-
ft
221
12427.38
92.05
354.50
31.80
8882.14
3305.86
2404.66
4387.67
5003.40
61.28
10.30
MWD
222
12459.64
93.95
355.20
32.20
8880.45
3336.48
2436.69
4384.78
5016.35
60.94
6.29
MWD
223
12491.07
94.35
356.70
31.50
8878.17
3366.56
2468.02
4382.54
5029.69
60.61
4.61
MWD
224
12523.13
94.65
356.70
32.00
8875.66
3397.22
2499.87
4380.64
5043.75
60.29
0.94
MWD
225
12553.75
94.40
357.00
30.60
8873.25
3426.57
2530.33
4378.94
5057.44
59.98
1.54
MWD
226
12585.12
94.00
357.40
31.40
8870.95
3456.76
2561.60
4377.41
5071.84
59.66
1.80
MWD
227
12617.13
93.85
357.70
32.00
8868.76
3487.58
2593.50
4376.05
5086.85
59.35
1.05
MWD
228
12646.25
94.30
358.50
29.10
8866.69
3515.68
2622.51
4375.06
5100.85
59.06
2.85
MWD
229
12679.88
93.95
359.50
33.70
8864.27
3548.34
2656.12
4374.44
5117.69
58.73
3.42
MWD
230
12711.90
93.35
358.80
32.00
8862.23
3579.39
2688.05
4373.97
5133.93
58.43
2.88
MWD
231
12743.64
94.45
355.60
31.70
8860.07
3609.87
2719.63
4372.43
5149.22
58.12
10.65
MWD
232
12775.75
96.95
353.10
32.10
8856.88
-1641^,•.19
2751.41
4369.25
5163.40
57.80
11.21
MWD
233
12808.70
97.76
355.40
33.00
8852.66
3671.24
2783.97
4365.95
5178.03
57.48
7.62
MWD M
234
12839.73
97.35
354.20
31.00
8848.58
3700.49
2814.57
4363.16
5192.21
57.17
4.06
MWD M
235
12871.27
97.20
353.90
31.60
8844.58
3730.20
2845.75
4359.91
5206.45
56.87
1.05
MWD M
236
12902.90
97.00
353.30
31.60
8840.67
3759.84
2876.91
4356.39
5220.61
56.56
2.29
MWD M
237
12934.53
96.80
352.80
31.60
8836.88
3789.38
2908.05
4352.57
5234.65
56.25
1.41
MWD M
238
12966.11
96.95
352.80
31.60
8833.10
3818.90
2939.17
4348.63
5248.75
55.95
0.47
MWD M
239
12998.10
94.85
352.40
32.00
8829.81
3848.80
2970.73
4344.54
5263.10
55.64
6.68
MWD M
240
13030.10
93.75
350.60
32.00
8827.41
3878.56
3002.29
4339.82
5277.10
55.32
6.58
MWD M
241
13062.17
91.85
351.40
32.10
8825.84
3908.35
3033.95
4334.78
5291.04
55.01
6.31
MWD M
242
13094.17
90.50
350.30
32.00
8825.18
3938.05
3065.53
4329.66
5305.04
54.70
5.25
MWD M
243
13126.23
89.95
349.20
32.00
8825.06
3967.53
3097.02
4323.97
5318.67
54.39
3.84
MWD M
244
13158.23
89.20
348.80
32.00
8825.29
3996.85
3128.43
4317.86
5332.07
54.08
2.66
MWD M
245
13190.25
90.00
348.50
32.00
8825.52
4026.09
3159.81
4311.56
5345.46
53.76
2.67
MWD M
246
13222.03
90.75
350.30
31.80
8825.31
4055.31
3191.06
4305.71
5359.30
53.46
6.13
MWD M
247
13253.71
90.80
350.30
31.70
8824.88
4084.63
3222.30
4300.37
5373.68
53.16
0.16
MWD M
248
13285.84
91.50
348.80
32.10
8824.24
4114.15
3253.86
4294.55
5388.03
52.85
5.16
MWD M
249
13317.32
91.95
349.90
31.50
8823.29
4143.07
3284.81
4288.73
5402.15
52.55
3.77
MWD M
250
13349.51
92.05
350.90
32.20
8822.17
4172.86
3316.54
4283.37
5417.25
52.25
3.12
MWD M
251
13381.40
89.60
349.50
31.90
8821.71
4202.33
3347.96
4277.91
5432.25
51.95
9.00
MWD M
252
13413.01
87.75
349.80
31.60
8822.44
4231.40
3379.03
4272.21
5446.98
51.66
5.99
MWD M
253
13444.67
86.05
349.10
31.70
8824.15
4260.50
3410.15
4266.41
5461.81
51.36
5.80
MWD M
254
13476.82
86.05
349.10
32.10
8826.36
4289.86
3441.59
4260.36
5476.79
51.07
0.00
MWD M
255
13509.35
85.55
348.70
32.50
8828.74
4319.53
3473.40
4254.12
5492.00
50.77
1.97
MWD M
256
13541.31
85.85
348.40
32.00
8831.14
4348.67
3504.68
4247.78
5506.94
50.48
1.32
MWD M
257
13572.92
87.85
349.50
31.60
8832.88
4377.55
3535.64
4241.71
5522.03
50.19
7.07
MWD M
258
13605.07
88.70
349.50
32.20
8833.85
4407.14
3567.28
4235.82
5537.83
49.90
2.66
MWD M
259
13637.34
88.35
350.20
32.20
8834.68
4436.81
3598.96
4230.14
5553.98
49.61
2.43
MWD M
260
13668.94
88.20
350.90
31.60
8835.63
4466.08
3630.12
4224.96
5570.28
49.33
2.26
MWD M
S43L1
Final surveys
6/19/97
Page 7
Seq
#
Measured
Depth
ft
Incl
angle
de
Azim
angle
de
Course
length
ft
TVD
depth
ft
Vertical
section
ft
Dis lacement
Total
displ
ft
at
Azim.
de
DLS
(deg/
100f
Survey
tool
e
+N/S-
ft
+E/W-
ft
261
13700.87
88.10
350.20
32.00
8836.66
4495.72
3661.67
4219.71
5586.93
49.05
2.21
MWD M
262
13732.81
88.00
350.50
31.90
8837.75
4525.22
3693.10
4214.36
5603.56
48.77
0.99
MWD M
263
13764.87
88.20
350.50
32.10
8838.81
4554.94
3724.74
4209.07
5620.49
48.49
0.62
MWD M
264
13796.62
88.50
350.90
31.70
8839.72
4584.33
3756.01
4203.95
5637.44
48.22
1.58
MWD M
265
13828.53
88.60
350.50
31.90
8840.53
4613.92
3787.48
4198.79
5654.63
47.95
1.29
MWD M
266
13860.67
88.75
350.50
32.20
8841.28
4643.74
3819.23
4193.48
5672.02
47.67
0.47
MWD M
267
13892.55
88.75
349.50
31.80
8841.97
4673.07
3850.54
4187.93
5689.06
47.40
3.46
MWD M
268
13924.81
88.80
350.20
32.30
8842.66
4702.83
3882.32
4182.21
5706.43
47.13
2.48
MWD M
269
13956.36
88.95
350.20
31.60
8843.28
4732.04
3913.45
4176.84
5723.73
46.86
0.47
MWD M
270
13988.04
89.10
349.50
31.60
8843.82
4761.16
3944.55
4171.24
5740.97
46.60
2.58
MWD M
271
14012.98
89.50
350.20
25.00
8844.12
4784.20
3969.15
4166.81
5754.69
46.39
3.58
MWD M
272
14061.00
89.50
350.20
48.00
8844.54
4828.56
4016.45
4158.65
5781.54
46.00
0.00
PROJ
[(c)1997 Anadrill IDEAL ]
S 43 L1
Final surveys 6/19/97 Page 8
M
47 -GS -2
SP EXPLORATION
BP Exploration (Alaska) Inc.
PO Box 196812
Anchorage, Alaska 99519-6612
MESSAGE#
T5L5C0P'Y R E Ct E I Vr' E rL,')'
COMMUNICATIONS CENTER
MAY 14 1997
QM. A as Canso 00060'11;
TO; Name: ?ULAiL�rao;�c�� �► _
Company: A0 rn c.c
Location:
Fax # 27(o- -7 S4 Z Confirm #
FROM: Name & Ext.: bAVi o 14 AKAM- LA. izA S-(. - 9'160 6
Department; 55 D R / $ PK A Mail Stop:
NOTES: S - 3 LEAK. yF,r- P?4 EM%A)
■
CoM P LkT Io^t bjAGILAm
loci w
No c`vtLic'ea�b� of �;wt�L�con •1e(
PAGES TO FOLLOW S` (Do Not Inotude Cover Sheet) 7 heareSorv- o�- fo
adwA "AUL-L5_
G"t Q-& 00-06a
(eig-
SECURITY CLASSIFICATION
PRIVATE SECRET CONFIDENTIAL
For Communications Center Use Only
Telecopy # Time In
Time Sent
Confirm # Time Confirmed
Confirmed By
Operator
T I IrIT I 1-11Jf11J�17 JSP 1M4Tb - JM J57 , t;7T 1HI.I
NABORS18E DRL FAX ID: MAY 0619( 21:1e NO -U12 N.03
P 'A HOI1HNO-IdX3 d3 W02P : ZO L6, PZ AUW
-W-LEA16 OFF DASA - -C-IMG 1T DATA
ARM,
...... . .. .-
86M
... ..L
1
...
3I
.. �_
I
1
3"
.1 1 1
.. •
_.I ..�.w�.ri
• •\.• ... YY.
-__u _r__i.. •.... .•
V
. •
_IIIIu_
/.1 . • 11
1i'W •
—1
'
11
'
• 111f1�{i� •
__. 1 . 1 . •..
. •
• 11 Y. N.I.M+....��.
�>• �� ,
_.Y_
1 1 • 1 r . .1
AV„ '
ZVO
11W 1
■11
rN- •'
,ir/r1
1
17M •
1. • 1
' . 1 101 - A 1.
tfiflil:
._ ... ,.1....1.1
_.1.._..._.1. , 1 ,.. .
I, i 32X1
.
_^rlp .u•...
1
�,
1(K0
...
. 1 ..,.
.. •
1 ,
'ion
—.1.�.w....�...
�
--•
—,---
�',{� .
W�/V.
_ ..
�
;Irl•• -•a r��
....:.. .�.... n 1_•1 .
1 r ..
1
ayyW//�,
• �
XI.II�P r ` 1
�_ .�.N •
• .
• n . . 1 . •1 • 1 1.
•
iLY?v(T
^I
u• .�
_.wNI.�Y+_ . 1.1
.1
fit
-M
U
IU 247 30.
A
' ittakw (M o0 '
,
. .,. ..... r,_•n_1•.•1 ..I
1. ... I.. urm• , ;_._
nKKn VV qq meq` �^.Y�
_1__r•_uuu ...*,:11�n1•....SI c�.• 1M�C
Alilska ail a Gas Cons. GQmnl.iss-w
Anchorage
P 'A HOI1HNO-IdX3 d3 W02P : ZO L6, PZ AUW
NAHORSISE DRL FAX ID: MAY 05'97 21:17 P
u•.•y, •Ir. 1� if Irwl■ wwrr• •�
LEAK-0Ff DATA—i—CAM& NU DATAJ.
WOO '
3600
1oo
UOU
33A3W
�!/{m
31W
M)
74*
NOp
POO*
26W
' 1�1t10
2340
Pira►
2(W
• � wo
)WO
G4 O
1 POMC .
y14M
1300
120
11CA,
1000
W
/�
j��
{/,00
{ilk
400
�M
100
0
,.uw,, •r •r.•, •
.'
r a •.r tap.
•�M•ua
\ -
•r ilrr••�i
as •.-
• to
ww
I/I/Ilara�•`r
•.�/N• r�r�
•
• . •/Y.�r _+.
•w./.1• ♦ 11
.
r■
II•• '
1 1, • rrrr•
1 1, _• r a♦HY
, ,
u_•�rr
.
70
_..�� ..
S -�. �I�Ir a
Yr.r ."do ♦ 1 1
Y 1 111 1 1 • •1 ,1. 1
•.ww1-r"11.
.•.. ••a••r . i
• 1
111 11
. r -•. .. •r•
__r�_r
,...,�\
a MIA&
�YYMA.
;
.r. -_r•
�M• .�• .
•
1 .
,a 110
, . , ��
r • . w, •1..1
11(',.. Y••Y�.■
AlIdI.-
r I
�A.�._1
•••- � I rr 1 r
. r
r • • a
Mlrl.•u�•�•u•ur• �-.
a .
r ru•.•
■u_WIIi,L.r►INR.•,ru
IIIIIp,11���__-
•/r�
-.. '
1
Iwo
, .,fly♦•!rte
•,• 1'I��I••!•
•fu_.• • . �•�/
••-r• • P
J • rl///•IMI•/1�/
• Wr\.VTTrr
-t•'
r '
' ./r .. •air
•9r_ir
.. .1r .r
w Irl IIMI/ all,
._/.ir�,rr MIM
41
•.•. a i r • -
...�..r.'. r••.r�l.._r.r
•
r r
r...+. _.
�i 1Q IS 20 95 , 40
Tun! tMin~
t7 'A NOI IHNO1dXA da WHEb : ZO ZG , PT AUW
NPBORSISE DRL FAX ID: MAY 06'97 21:15 No.012 P.02
aSING AND LEAK•OFf ERACTURN XE$TO
c sq U161tiA TIVq u. 94W 40s rase IBTG Svpon or; John Ren _
CsW Sol llrig DopAt 3120 . TMD . -.-ft.AQ_=WD
Mild wol jhrl: 8 ppp Imokoff pre�r arc
1:,67 ppg . Hale DGp1ht 5155
mica Pumpoci. 2.0 Bbb Valum Book
LEAK -OFF DATA CAIIIND TEST DATA
Enter WOW Rplia Piamours Enter •t *9v I nwr Mum
HereNero HEM 1"ro
„ray 0 1 0
ySmi
%! 140
b 340
. _. . h .... ...n. 1 ..
. .. X4.40 _ 1 Q ' _ 630 .
�. �
is 62.0 �� t8 800
��` 20 ' BfiO �11 �4a
go 1420
y . _..rr.rr.rr.Y.rn M•�•iw.._ _�r.r 1 �
i t/
! alis Palo
N ,• 1:1 40 2440
45 Palo
48 !�, . A•.c1 . r 1
Fntnr* iriirlinn Entar Walding ( It®r inq • Entnr I Inldlno
Tima I lora Prowura I•lere Time Hare Promra I lore+
`. 9►V.,i I 1 450 0 , xoon
1 . w . ... /l..r/• •l..r . r . rw w.rvrr.►..r•
640 � a 3006
' 4 510 .3 '3000
I A9G ..� 4 3tXi0
r�..r lnA. 1 .•H •�wA _.. r�t✓r.
,;► ' y: r n a E -- 3000
410 1 s _ 2000
20 FOOD
404 ...... _ :� ; 3000
,>, r 1 34 3000
.�5`I.,1 1' ' _... r r .0 .x . . r . 1 . .r. _ ' _' .�•.1 1 a . . . .. r.. u... 8 ® •I �
I �
NA IAY 14 1997
Al Gas Cons. OQMMISB't
•; - -1 I nT I H?4(11,4u74 49 WH7b ! ) n );7,, bT ),HW
AI<ASKA OIL AND GAS
CONSERVATIO3T COMMISSION
March 27. 1997
Paul Prince
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Unit S-431-1
BP Exploration (Alaska) Inc.
Permit No: 97-53
Sur. Loc.: 4211'NSL, 4503'WEL, Sec. 35, Tl -'N. R12E, UM
Btmhole Loc: 2858'NSL. 229'WEL, Sec. 26. T12N, R12E, UM
Dear Mr. Prince:
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining- additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
The permit is for a new segment from existing well S43, Permit No. 97-52, API No. 50-029-
22754. Production should continue to be reported as a function of the original well identifier.
Blowout prevention equipment (BOPS) must be tested in accordance with 20 AAC 25.035.
Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the
surface casing shoe must be given so that a representative of the Commission may witness the
test. Notice may be given by contacting the Commission petroleum field inspector on the North
Slope pager at 659-3607.
Sincerely,
Mary Marshburn
Commissioner
BY ORDER OF THE COMMISSION
d1E'enclosures
cc: Department of Fish & Game. Habitat Section w/o encl.
Department of En%inornment Conservation w/o enol.
Steve McMains - AOGCC
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1a. Type of work ® Drill ❑ Redrill
1 b. Type of well ElExploratory E]Stratigraphic Test ® Development Oil
E] Re -Entry E] Deepen:
❑ Service ❑ Development Gas ❑ Single Zone []Multiple Zone
2. Name of Operator
5. Datum Elevation (DF or KB)
10. Field and Pool
BP Exploration (Alaska) Inc.
Plan KBE = 66.9'
Prudhoe Bay Field / Prudhoe
Bay Pool
3. Address
6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612
ADL 028257
4. Location of well at surface
7. Unit or Property Name
11. Type Bond (See 20 AAC 25.025)
4211' NSL, 4503' WEL, SEC. 35, T12N, R12E, UPM
Prudhoe Bay Unit
At top of productive interval
8. Well Number
Number 2S100302630-277
4824' NSL, 974' WEL, SEC. 35, T12N, R12E, UPM
S-431_1
At total depth
Amount $200,000.00
9. Approximate spud date
2858' NSL, 229' WEL, SEC. 26, T12N, R12E, UPM
04/11/97
12. Distance to nearest property line
13. Distance to nearest well
14. Number of acres in property
15. Proposed depth (MD and TVD)
ADL 047448, 2422'
1 S-44, 29' away at 1500' MD
2560
14096' MD / 8877' TVD
16. To be completed for deviated wells
17. Anticipated pressure (see 20 AAC 25.035 (e) (2))
Kick Off Depth 1500' Maximum Hole An le 91.3 °
Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 91.5# H-40 Weld 80' Surface Surface 110' 110' 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC -Mod 3120' Surface Surface 3120' 3067' 120 sx CSlll, 500 sx'G', 1865 sx CSIII
8-1/2" 7" 26# L-80 BTC -Mod 10216' Surface Surface 10216' 8996' 580 sx Class 'G'
6" 4-1/2" 12.6# L-80 NSCT 4276' 9820' 8888' 14096' 8877' Uncemented Slotted Liner
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface �..
Intermediate a
Production
Liner 29,97
Perforation depth: measured R
true vertical
20. Attachments ® Filing Fee ❑ Property Plat ❑ BOP Sketch ❑ Diverter Sketch ® Drilling Program
® Drilling Fluid Program ❑ Time vs Depth Plot ❑ Refraction Analysis ❑ Seabed Report ❑ 20 AAC 25.050 Requirements
Contact Engineer Name/ umber: David Nakamura, 564-5606 Prepared By Name/Number. • Terrie Hubble, 564-4628
21. 1 hereby certify that th rego"n i tr a and correct to the best of my knowledge 3113 jq'l
Signed
Paul Prince - Title Senior Drilling Engineer Date
Commission Use Only
Permit Number
-
API Number
% 491�
Approval Date
See cover letter
50- o ZZ
2, 1 .C'7
for other requirements
Conditions of Approval: Samples Required ❑ Yes X No Mud Log Required ❑ Yes Flo,
Hydrogen Sulfide Measures ,krYes ❑ No Directional Survey Required A Yes ❑ No
Required Working Pressure for BOPE ❑ 2M; ❑ 3M; ,K5M; ❑ 10M; ❑ 15M
Other: by order of
Approved By Commissioner the commission Date
Form 10-401 Rev. 12-01-85 Submit In Triplicate
Well Name: I S-43 / S -43L1
Well Plan Summary
Type of Well(producer or injector): I Oil Producer
Surface Location:
4211' FSL 4503' FEL
Sec 35 T12N
R12E
1801'
1800'
Sadlerochit Zone 4 lower Lateral
Start of Horizontal Location:
4797' FSL
975' FEL
Sec 35 T12N
R12E
End of Horizontal Location:
2858' FSL
229' FEL
Sec 26 T12N
R12E
6742'
TVD UL :
Sag
River (upper)
Lateral
Start of Horizontal Location:
4824' FSL
974' FEL
Sec 35 T12N
R12E
End of Horizontal Location:
2858' FSL
229' FEL
Sec 26 T12N
R12E
AFE Number: 14PO755
Rig: Nabors 18E
Estimated Start Date:
Aril 1
1 Operating
days to complete: 145
1801'
1800'
SV3
2819'
2782'
U nu
-GL 29.7'
MD LL : 14082'
West Sak
TVD (LL):
9022'T
MD UL : 14096'
6997'
6742'
TVD UL :
8877'
KBE: 66.9'
Well Design (conventional, slimhole, etc.) Ultra Slimhole High Angle Multi -Lateral
(targeting Sadlerochit Zone 4 and Sag River
Formation Markers:
Formation Tops
MD
TVD RKB
Base Permafrost
1801'
1800'
SV3
2819'
2782'
U nu
3689'
3607'
West Sak
5040'
4887'
Ku aruk
6997'
6742'
LCU
7055'
6797'
Kin ak
7914'
7612'
J -D
8604'
8264'
J -B
9406'
8714'
Sag River
9756'
8862'
Shublik
9851'
8902'
Sadlerochit
10136'
8992'
TD of Sadlerochit Lateral
14082'
9022'
Sag Lateral Kickoff
9798'
8879'
TD of Sag River Lateral
14096'
8877'
1997
:�4e�tit3�{ �-,9�,•'.��, 5._'7:�� +e`:7a�ti> 4i�ilil:;ied�lf'rb�
S-43 / S-431_1 Permit Info
Page 1
Casinq/Tubinq Program:
Hole Size
Csg/
Tb O.D.
Wt/Ft
Grade
Conn.
Length
Top
MD/TVD
Btm
MD/TVD
30"
20"
91.5#
H-40
Weld
80'
Surface
1101/110'
12-1/4"
9-5/8"
40#
L-80
BTC-
MOD
3120'
Surface
312073067'
8-1/2"
7"
26#
L-80
BTC-
MOD
10216' -T
Surface
1021678996'
1
Lower Lateral
6"
4-1/211
12.6#
L-80
IBT-
MOD
2193'
1006678978'
1225979041'
6"
4-1/2"
12.6#
L-80
NSCT
1823'
1225979041'
1408279022'
Upper Lateral
6" 1 4-1/2"
12.6# L-80 NSCT 4276' 982078888' 1409678877'
Tubing
4-1/2"
12.6#
L-80
IBT-
MOD
9748'
Surface
9748'/8858'
Logginq Program:
Logs:
91.30
12-1/4" Hole
........................................................
8-1/2" Hole
........................................................
6" Sadlerochit
MWD Directional
MWD: GR/Directional
MWD: GR/Resistivity/Directional
........................................................
6" Sa River
MWD: GR/Resistivity/Directional
Cased Hole:
Optional: CNUCBT
Directional:
KOP: 1 1500'
Maximum Hole Angle:
91.30
Tangent Angle
30.0°
Close Approach Well:
S-44 (29' away at 1500' MD) and S-42 (32' away
at 1400' MD
rk C--. C, in -hvg I= U
,,i��.�. 199 7
1, us- k a 0'11 i1-, s'I,a3 C034f5, CC -5 fiia-3i01rs
r;,.
tII f<f.
S-43 / S-431-1 Permit Info Page 2
Mud Program:
Surface Mud Properties: I Surface hole section: SPUD
Mud Properties: I Intermediate
Density Marsh
PPG Viscosity
Yield 10 sec
Point gel
10 min
gel
pH
Fluid
Loss
Initial
8.5 ± 300
40-60 30-60
50-80
9-10
15-25
Final
9.5 200-300
25-50 15-25
25-40
9-10
15-25
Hazards/Concerns Due to light gravel expectations, no real concerns in surface hole.
Intermediate
Mud Properties: I Intermediate
hole section:
LSND
Density
PPG Viscosity
Density
Marsh
Yield
10 sec
10 min
pH
Fluid
Hazards/Concerns
PPG
Viscosity
Point
gel
gel
Differential sticking possible with overbalance situation.
Loss
Initial
8.8-9.0
35-40
8-12
3-6
8-10
9.0-9.5
8-12
Cretaceous
10.0
40-45
10-12
4-8
8-12
9.0-9.5
6-8
Final
10.0
45-50
12-15
4-8
8-12
9-10
<6
HTH P-13.0
Hazards/Concerns
Cretaceous overpressure expected, MW to be at least 10.0 ppg.
Utilize hi vis sweeps to assist hole cleaning
Monitor LSYP and increase if problems occur trying to clean the hole.
Potential high torque could need lubricants (EP MudLube)
Reduce API fluid loss to <6 cc before drilling Kingak Section.
If high torque is encountered, respond with lubricants.
Note: The Jurassic shales may be troublesome, so treat with 2 ppb Baratrol and 6 ppb
Baranex.
Sadlerochit Mud Pro erties: I Production hole section: QUCIKDRILn for Sadlerochit lateral
Depth
Density Marsh LSRV LSRYP
pH
Density
PPG Viscosity
LSRV
Initial
8.7-8.9 50-65 >45,000 10-20
8.5-9.0
Final
8.8-9.0 50-60 30-40 15-20
8.5-9.0
Hazards/Concerns
Lost Circulation a possibility due to overbalance in Sadlerochit.
Initial
8.7-8.9
Differential sticking possible with overbalance situation.
>45,000
10-20
8.5-9.0
Perform/report daily checks on KCI concentrations in Xanvis KCI system.
8.8-9.0
50-60
High torque may be experienced and should be countered with lubricants
LubeTex
Sag River Mud Properties.
Production hole section: QUCIKDRILn for Sag River lateral
Depth
Density
Marsh
LSRV
LSRYP
pH
PPG
Viscosity
Initial
8.7-8.9
50-65
>45,000
10-20
8.5-9.0
Final
8.8-9.0
50-60
30-40
15-20
8.5-9.0
Hazards/Concerns
Lost Circulation a possibility due to overbalance in Sag River
Differential sticking possible with overbalance situation.
Perform/report daily checks on KCI concentrations in Xanvis KCI system.
High torque may be experienced and should be countered with lubricants LubeTex
Well Control:
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is
capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
S-43 / S-431-1 Permit Info Page 3
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL: S-43 / S-43 L 1
MIRU. NU diverter and function test same.
2. Drill 12-1/4" hole to ±3120' MD/3067' TVD. Run and cement 9-5/8" 40# L-80 BTC -MOD casing to surface
with Halliburton ES Cementer (two stage surface cement job).
3. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular
preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir
pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600'
TVDss and an oil column to 8800' TVDss. Function test BOPE to 5000/250 psi.
4. Test 9-5/8" casing to 3000 psi for 30 minutes. A formation leak -off test will be performed when 20' of new
hole has been drilled below the 9-5/8" shoe. Also, perform a well kill drill at this time.
5. Directionally drill 8-1/2" hole to 7" casing point at ±10216' MD/8996' TVD. Run 7" 26# L-80 BTC -MOD casing
string and cement with Class G cement to 500' MD above the Ugnu. Test casing to 3,500 psi. The annulus
will be freeze protected with dead crude oil.
6. Drill 20' of new 6" hole and test the formation to a minimum of 0.5 ppg over the mud weight to be used to drill
the previous hole section. Displace mud system to QUICKDRILn mud system. Directionally drill high angle
section with MWD/GR/Resistivity to TD at ±14082' MD/9022' TVD.
7. RIH with 4-1/2", 12.6#, L-80 solid x slotted liner, 4-1/2" ECP, 4-1/2" ES Cementer and 7" x 4-1/2"
packer/hanger spaced out for a 150' lap. Cement liner in place with the total cement volume based on 40%
excess in open hole, 150' lap and 40' shoe volume. Bump plug. Set and test liner hanger/packer with 3500
psi.
8. RIH with 3-3/4" bit to clean out cement in liner to TD. Displace to seawater. POOH.
9. RIH with 2-3/4" drillpipe conveyed perf guns and perforate 4-1/2" solid liner. POOH and lay down guns.
10. Set 7" x 4-1/2" permanent ML production packer (with 4-1/2" tubing tail) at ±9815' MD/8887' TVD (17' MD below
the planned top of whipstock).
11. Set oriented, retrievable whipstock above permanent packer so the top of the whipstock window will be at ±9798'
MD/8879' TVD.
12. Displace well to QUICKDRILn mud system used to drill lower lateral. Mill window off whipstock at ±9798' MD and
drill 29' window/new hole. POOH.
13. RIH with 6" steerable assembly (MWD/GR/Resistivity). Finish kickoff and directionally drill in Sag River, drilling
6" horizontal hole to TD at ±14096' MD/8877' TVD.
14. Run and set a4-1/2", L-80 slotted liner. Top of liner will beat ±9820' MD/8888' TVD (10' below casing exit/base
of whipstock).
15. RIH and pull retrievable whipstock.
16. Run 4-1/2", 12.6 # L-80 IBT-MOD tubing with SSSV, GLMs, and 7" packer assembly. Circulate around freeze
protection fluid and corrosion inhibitor. Set packer and test tubing to 4,000 psi.
17. Set TWC and test to 1000 psi. ND BOPE. NU tree and test to 5000 psi. Pull TWC. Test tubing x casing
annulus to 3500 psi for 30 minutes. Secure well. Release rig.
S-43 / S-431-1 Permit Info Page 4
Drilling Hazards
• Hydrocarbon -bearing zone in the Ugnu formation.
• Losses have been encountered drilling the Kingak, Sag River/Shublik and Sadlerochit formations on S Pad. Be
prepared for losses near any faults and formation interfaces between the Kingak, Sag River/Shublik and
Sadlerochit.
• A minimum of 10.0 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi
trip margin over the expected 9.4 ppg EMW @ 5000' TVDss.
Disposal
Cuttings Handling: Cuttings should be hauled to the ball mill at CC -2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC -2A for injection. Haul all
Class I wastes to Pad 3 for disposal. In addition, haul all cutting from drilling operations to CC -
2A for disposal, except the metal cuttings which will be sent to the North Slope Borough.
S-43 / S-431_1 Permit Info Page 5
9-5/8" CASING CEMENT PROGRAM
CASING SIZE: 9-5/8" CIRC. TEMP: 38°F
FIRST STAGE CEMENT
PREFLUSH: 75 bbis viscosified_fresh water ahead of lead slurry.
LEAD CEMENT TYPE: COLD SET III (accounts for any variance in depth of ES cementer)
ADDITIVES: retarder
WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps
APPROX. # SACKS: 120 THICKENING TIME: Greater than 4 hr. @ 50°F
TAIL CEMENT TYPE: CLASS G
ADDITIVES: 2% A-7 +1 ghs FP -61 -
WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx MIX WATER: 4.95 gps
APPROX. # SACKS: 500 THICKENING TIME: Greater than 3-1/2 hr. @ 50°F
SECOND STAGE CEMENT
PREFLUSH: 75 bbis viscosified fresh water ahead of lead slurry.
LEAD CEMENT TYPE: COLD SET III
ADDITIVES: retarder - (Add 9 ppb Borax to first 30 bbis (90 sx) of Cold Set III lead cement in second stage)
WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps
APPROX. # SACKS: ±1865 THICKENING TIME: Greater than 4 hr. @ 50°F
TOP JOB CEMENT TYPE: COLD SET 11 (if necessary)
ADDITIVES:
WEIGHT: 14.5 ppg YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps
APPROX. # SACKS: 250 THICKENING TIME: Greater than 2 hr. @ 50°F RECEIVED
CENTRALIZER PLACEMENT: M 474 14 1997
1. Run one (1) bow spring centralizer per joint for the first 15 joints.
CEMENT VOLUME:
Alulm Oil & Gas Cons. Ganmiso
� ., .
1. Lead slurry volumes estimated: ��mg
a. Base of Permafrost to Conductor shoe with 400% excess
b. Conductor x Surface Casing annulus (80' MD)
c. Cement in surface casing to the ES Cementer at 1800' MD
NOTE: With the two stage job, the actual lead cement volumes will be determined by the amount of
cement necessary to get lead cement to surface.
2. Tail slurry volume from surface casing shoe to Base Permafrost with 30% excess plus the 80' shoe volume
3. Top job volume 250 sx (if necessary)
S-43 / S-431-1 Permit Info Page 6
7" CASING CEMENT PROGRAM
CASING SIZE: 7" CIRC. TEMP: 140°F
PREFLUSH: 20 bbis fresh water
SPACER: 50 bbls BJ MCS -4 Spacer weighted 1.0 ppg above mud weight.
LEAD CEMENT TYPE: CLASS G
ADDITIVES: 3% A-2 + 0.4% FL -52 + 0.5% CD -32 + 1 ghs FP -61 -
WEIGHT: 11.0 ppg YIELD: 3.31 ft3/sx MIX WATER: 20.92 gps
APPROX. # SACKS: 320 THICKENING TIME: 5 hrs
FLUID LOSS: 150-250 cc/30 minutes FREE WATER: 0 cc
TAIL CEMENT TYPE: CLASS G
ADDITIVES: 0.3% FL -52 + 0.5% CD -32 + 0.1 % A-2 + 1.0 ghs FP -61 -
WEIGHT: 15.8 ppg YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps
APPROX. # SACKS: 260 THICKENING TIME: 3-1/2 to 4-1/2 hrs
FLUID LOSS: 100-150 cc/30 minutes FREE WATER: 0 cc
CENTRALIZER PLACEMENT:
1. Run 1 straight blade rigid centralizer per joint from TD to 500' MD above Sag River.
2. NO CENTRALIZERS TO BE PLACED ACROSS THE 3 STL JOINTS OF 7" CASING.
3. Run 1 straight blade rigid centralizer every joint 300' above and below the Ugnu.
OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to
pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the
lead and tail slurries on the fly.
CEMENT VOLUME:
1. Lead slurry to 3189' MD (500' above Ugnu) with 50% excess
2. Tail slurry to 8756' MD (1000' above Sag River) with 50% excess
3. 80' MD 7" 26# capacity for float joints.
Note: Hydrocarbon bearing zones are identified in the Ugnu and Sag River intervals.
S-43 / S-431-11 Permit Info Page 7
4-1/2" PRODUCTION LINER (LOWER LATERAL)
SOLID X SLOTTED CEMENT PROGRAM
CIRC. TEMP: 1400 F
PREFLUSH: 20 bbls 2% KCI water
BHST: 220° F at 8800' TVDss
SPACER: 50 bbis BJ MCS -4 Spacer weighted 1.0 ppg above mud weight with 2% KCI
CEMENT TYPE: CLASS G with 2% KCI
ADDITIVES: 175 ghs BA -86L + 2% A-9 + 0.6% CD -32 + 0.3% FL -33 + 0.2% A-2 + 0.5% gel + 1 ghs FP -6L
WEIGHT: 15.7 ppg YIELD: 1.19 ft3/sx MIX WATER: 3.43 gps
APPROX. # SACKS: 225 THICKENING TIME: 45 min. @ Surface + 3-4 hr. @ 140°F
FLUID LOSS: less than 50 cc/30 minutes @ 140°F FREE WATER: 0 cc at 450 angle.
CENTRALIZER PLACEMENT:
1. Run 2 right hand turbolators per joint in open hole,
2. Run 1 right hand turbulator per joint in lap, and none opposite intermediate casing shoe..
OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss
should be 50 cc/30 min. or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm.
LINER CEMENT VOLUME:
1. Open hole (6" X 4-1/2") + 40% excess (adjust if a caliper log is run and it indicates severe washouts).
2. 4-1/2", 12.6# casing capacity below landing collar (80').
3. 150' liner lap
4-1/2" PRODUCTION LINER (UPPER LATERAL)
No cement necessary - slotted liner.
S-43 / S-431-1 Permit Info
Page 8
Section Departure
Anadrill (c)97 543LIP12 3.00 3:03 PM P)
SHARED
SERVICES DRILLING
Anadrlll schlumberger
S -43L I
(P 12)
VERTICAL SECTION
VIEW
Section at: 12.63
7000
TVD Scale.: 1 inch = 500
feet
Dep Scale.: 1 inch = 500
feet
7250
) L -
Drawn .....: It Mar 1997
APPROVED
7500
Marker Identification MD
BKB
SECTN
INCLN
N 1 L
A) TOP OF WHIPSTOCK 9798
8879
916
65.00
B) BASE OF WHIPSTOCK 9810
8684
922
67.00
PiIG�
C) KOP / CURVE 30/100 9827
8891
932
67.00
7750
D) END 30/100 CURVE 9929
8906
999
96.13
E) CURVE 10/100 10222
8874
1213
96.13
F) END 10/100 CURVE 10413
8667
1371
68.34
T 8000
G) TARGET START **xxxxx 10413
8667
1371
66.34
H) CURVE 6/100 11793
8907
2617
88.34
V
I) END 6/100 CURVE 12617
8910
3415
91.28
D
J) 4-3/4" LINER POINT 14096
8877
4766
91.26
8250
K) TD 14096
8877
4766
91.28
8500
8750•
-SIG V(
--
-------
12111 ct_
inti _
-----
----
---
—
---^—
SHu6L
E
F
9000
b�AdU�'u
C �w�
�0
_____
_________________
- - - --
- - - - -
--
__ _
-__=--=--=
--
______________
=__-=
_-----__==
___'_
---__
-----
_____
T73 _911T-----
— — — ——
———— —
— — — ——
—
— — — —
— — — ——
———— —
— — — ——
— — — ——
———— —
— — — ——
— — — ——
— — — ——
———— —
— — —
——
— — —
——
— —
— ——
9250
.
9500-
9750
10000
500
750
1000 1250 1500 1750
2000 2250 2500 2750 3000 3250 3500 3750 4000 4250
4500
4750
5000
Section Departure
Anadrill (c)97 543LIP12 3.00 3:03 PM P)
I anadrill Schlumberger I SHARED SERVICES DRILLING I
S-43LI W12)
PLAN VIEWZ
CLOSURE.....: 5801 feet at Azimuth 47.38 — 4400
DECLINATION.: +28.337 (E)
SCALE .......: 1 inch = 800 feet
DRAWN .......: 11 Mar 1997 4000
N �VG
Marker Identification MD N/S E/W — — + 3600
A) TOP OF WHIPSTOCK 9798 258 N 3038 E '
B) BASE OF WHIPSTOCK 9810 262 N 3048 E
C) KOP / CURVE 30/100 9827 269 N 3062 E '
D) END 30/100 CURVE 9929 319 N 3148 E 3200
E) CURVE 10/100 10222 464 N 3389 E
F) END 10/100 CURVE 10413 614 N 3528 E '
G) TARGET START ******* 10413 614 N 3528 E
H) CURVE 6/100 11793 1701 N 4376 E -- 2800
I) END 6/100 CURVE 12617 2478 N 4560 E ,
J) 4-3/4" LINER POINT 14096 3928 N 4268 E
K) TO 14096 3928 N 4268 E
I 2400
2000
Tu Poin (Point)
H
1600
-- 1200
Tar t Star (Point) 800
-- - - 400 =
Q
0
Z
-- ----0
KB-- --
0
400
400 0 400 800 1200 1600 2000 2400 2800 3200 3600 4000 4400 .4800 5200 5600 6000 6400 6800
<- WEST : EAST ->
Anadrill M97 S43LIP12 3.00 3;06 PM P)
Anadrill Schlumberger
Alaska District .
1111 East 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 344-2160
DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING
Well.........: S -43L1 (P12)
Field......... Prudhoe Bay, S -Pad
Computation..: Minimum Curvature
Units......... FEET
Surface Lat..: 70.35514443 N
Surface Long.: 149.03417336 W
LOCATIONS - ALASKA Zone: 4
Legal Description X-Coord Y-Coord
Surface......: 4211 FSL 4503 FEL S35 T12N R12E UM 618929.89 5980414.71
Top of Whpstk: 4468 FSL 1464 FEL S35 T12N R12E UM 621963.21 5980720.68
Target Start.: 4824 FSL 974 FEL S35 T12N R12E UM 622447.00 5981085.00
Turn Point...: 631 FSL 124 FEL S26 T12N R12E UM 623278.00 5982185.00
BHL.\.TGT End: 2858 FSL 229 FEL S26 T12N R12E UM 623135.00 5984410.00
PROPOSED WELL PROFILE
Prepared.....: 11 Mar 1997
Vert sect ax.: 12.63
KB elevation.: 66..90 ft
Magnetic Dcln: +28.337 (E)
Scale Factor.: 0.99991607
Convergence..: +0.90962002
ANADRILL AKA-DPC
APPROVED
FOR PERMITTING
ONLY
PLAN #
STATION
MEASURED
INCLN
DIRECTION
VERTICAL -DEPTHS
SECTION
COORDINATES -FROM
ALASKA Zone 4
TOOL
DL/
IDENTIFICATION
DEPTH
ANGLE
AZIMUTH
TVD
SUB -SEA
DEPART
WELLHEAD
X
Y
FACE
100
cxaasaasxamsssssaaa:
SAG RIVER
aao3xaas
asaaca
xax=xaamm
aaaamass
8861.90
axaaxasa
8795.00
mxsaaa:a
xsmaaassxa
sa3asamsas
..rims...
oaaassaaxs
assn
rima
TOP OF WHIPSTOCK
9797.72
65.00
65.00
8879.40
8812.50
915.70
257.80
N
3038.05
E 621963.21
5980720.68
HS
9800.00
65.38
65.00
8880.36
8813.46
916.96
258.67
N
3039.93
E 621965.08
5980721.58
HS
16.67
BASE OF WHIPSTOCK
9809.72
67.00
65.00
8884.28
8817.38
922.39
262.43
N
3047.98
E 621973.07
5980725.47
HS
16.67
KOP / CURVE 30/100
9826.72
67.00
65.00
8890.92
8824.02
931.94
269.04
N
3062.17
E 621987.14
5980732.31
19L
0.00
9850.00
73.63
62.66
8898.76
8831.86
945.68
278.71
N
3081.83
E 622006.65
5980742.29
18L
30.00
SHUBLIK
9862.45
77.19
61.48
8901.90
8835.00
953.51
284.36
N
3092.47
E 622017.20
5980748.10
18L
30.00
9875.00
80.77
60.32
8904.30
8837.40
961.71
290.35
N
3103.23
E 622027.86
5980754.26
17L
30.00
9900.00
87.93
58.07
8906.76
8839.86
978.80
303.08
N
3124.58
E 622049.01
5980767.33
17L
30.00
9925.00
95.10
55.85
8906.10
8839.20
996.66
316.70
N
3145.52
E 622069.72
5980781.27
17L
30.00
END 30/100 CURVE 9928.61 96.13 55.52 8905.74 8838.84 999.29 318.72 N 3148.49 E 622072.66 5980783.35 HS 30.00
(Anadrill (c)97 S43L1P12 3.00 2:42 PM P)
S -43L1 (P12)
PROPOSED WELL PROFILE
11 Mar 1997 Page 2
xxxxxxxx=xxxxxxxxxxx
STATION
_=xxxx=x
MEASURED
xxxxxs
INCLN
xaxaxxsxxx
DIRECTION
aaacx socxxsmasaaass
VERTICAL -DEPTHS
sassmmmm
SECTION
ss:xcasaaxs¢amaassasa
COORDINATES -FROM
smasm.x msasammsmamsma
ALASKA Zone 4
axaa
TOOL
asas
DL/
IDENTIFICATION
DEPTH
ANGLE
AZIMUTH
TVD
SUS -SEA
DEPART
WELLHEAD
X
Y
FACE
100
CURVE 10/100
===.=
10221.76
9 6 x x S x
96.13
=
55.52
8874.43
8807.53
1212.82
483.71
N 3388.76 E
622310.26
a a a maa qs m in a
5980952.11
a m a in
113L
-..a
0.00
10300.00
92.98
48.34
8868.21
8801.31
1273.13
531.78
N 3450.11 E
622370.84
5981001.14
114L
10.00
10400.00
88.89
39.21
8866.57
8799.67
1358.59
603.89
N 3519.19 E
622438.76
5981074.33
114L
10.00
END 10/100 CURVE
10413.49
88.34
37.98
8866.90
8800.00
1370.71
614.42
N 3527.60 E
622447.00
5981085.00
HS
10.00
TARGET START *******
10413.49
88.34
37.98
8866.90
8800.00
1370.71
614.42
N 3527.60 E
622447.00
5981085.00
HS
10.00
CURVE 6/100
11792.79
88.34
37.98
8906.90
8840.00
2616.66
1701.18
N 4376.03E
623278.00
5982185.00
87L
0.00
11800.00
88.36
37.55
8907.11
8840.21
2623.19
1706.88
N 4380.45 E
623282.32
5982190.77
87L
6.00
11900.00
88.70
31.55
8909.68
8842.78
2715.88
1789.18
N 4437.11 E
623337.67
5982273.95
87L
6.00
12000.00
89.05
25.56
8911.65
8844.75
2811.98
1876.95
N 4484.89.E
623384.04
5982362.46
87L
6.00
12100.00
89.40
19.57
8913.00
8846.10
2910.42
1969.25
N 4523.25 E
623420.93
5982455.35
87L
6.00
12200.00
89.77
13.58
8913.72
8846.82
3010.14
2065.04
N 4551.76 E
623447.92
5982551.58
86L
6.00
12300.00
90.14
7.60
8913.80
8846.90
3110.03
2163.29
N 4570.13 E
623464.73
5982650.10
86L
6.00
12400.00
90.51
1.61
8913.24
8846.34
3209.00
2262.92
N 4578.15'E
623471.16
5982749.84
87L
6.00
12500.00
90.87
355.62
8912.04
8845.14
3305.97
2362.84
N 4575.73 E
623467.16
5982849.69
87L
6.00
12600.00
91.22
349.63
8910.22
8843.32
3399.88
2461.95
N 4562.90 E
623452.75
5982948.58
87L
6.00
END 6/100 CURVE
12616.51
91.28
348.64
8909.86
8842.96
3415.02
2478.16
N 4559.79 E
623449.38
5982964.73
HS
6.00
4-3/4" LINER POINT
14096.06
91.28
348.64
8876.90
8810.00
4766.43
3928.35
N 4268.36 E
623135.00
5984410.00
0.00
TD
14096.06
91.28
348.64
8876.90
8810.00
4766.43
3928.35
N 4268.36 E
623135.00
5984410.00
0.00
TSAD / TZ4B
8991.90
8925.00
TZ4A
9041.90
8975.00
TOP HEAVY OIL/TAR 9056.90 8990.00 ANA DRILL
CURRENT OWC 9086.90 9020.00APPROVED pP AKA-DPC
A
TZ3 9161.90 9095.00 O V E D
FOR PERMITTING
ONLY
PLAN',
(Anadrill (c)97 S43L1P12 3.00 2:42 PM P)
H 104187
VENDOR�I�=i
11 9 7= 1 1?97I I 1 I
I �
:i1 H I ERR I E HU--'-) L X 45-28
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. 1111111011 Ifelm Will' ' 1
WELL PERMIT CHECKLISTCOMPANY zt':2 WELL NAME � C5--' 5✓9 PROGRAM: exp❑ dev/-Mrredrl❑ serv❑ wellbore sex ann disp para req❑
FIELD & POOL g52 f� INIT CLASS new GEOL AREA 7� UNIT# '//�s�j ON/OFF SHORE
�T1MTAITCTRnTT�1N
HOW/dlf - A:IFORMSIcheklist rev 01197
Cil
REMARKS
1.
Permit fee attached . . . . . . . . . . . . . . . . .
Y N
2.
Lease number appropriate. . . . . . . . . . . . . . .
Y N
3.
Unique well name and number . . . . . . . . . . . . . .
Y N
4.
Well located in a defined pool. . . . . . . . . . .
.Y N
5.
Well located proper distance from drlg unit boundary. .
.Y N
6.
Well located proper distance from other wells. . . . .
Y N
7.
Sufficient acreage available in drilling unit. . . . .
Y N
8.
If deviated, is wellbore plat included . . . . . . . .
Y N
9.
Operator only affected party. . . . . . . . . . . .
.Y N
10.
Operator has appropriate bond in force. . . . . . .
.Y N
11.
Permit can be issued without conservation order. . . .
Y N
APPRATE
12.
Permit can be issued without administrative approval. .
.Y N
��
13.
Can permit be approved before 15 -day wait.. . . . . .
. Y N
ENGINEERING
14.
Conductor string provided . . . . . . . . . . . . . . .
.Y N
15.
Surface casing protects all known USDWs . . . . . . . .
.Y N
16.
CMT vol adequate to circulate on conductor & surf csg.
. Y N
17.
CMT vol adequate to tie-in long string to surf csg . .
. Y N
18.
CMT will cover all known productive horizons. . . . . .
.Y
OF
19.
Casing designs adequate for C, T, B & permafrost. . . .
N
20.
Adequate tankage or reserve pit. . . . . . . . . . .
. N
21.
If a re -drill, has a 10-403 for abndmmnt been approved.
i'l
22.
Adequate wellbore separation proposed. . . . . . . . .
. N
23.
If diverter required, is it adequate. . . . . . . . . .
/�
A
24.
Drilling fluid program schematic & equip list adequate
N
25.
BOPEs adequate . . . . . . . . . . . . . . . . .
N
APPR TE
26.
27.
BOPS press rating adequate; test to psig. N /
Choke manifold complies w/API RP -53 (May 84). . . . . N
28.
Work will occur without operation shutdown. . . . . . .
N
29.
Is presence of H2S gas probable . . . . . . . . . . . .
.Y N
GEOLOGY
30.
Permit can be issued w/o hydrogen sulfide measures.
.Y N
31.
Data presented on potential overpressure zones . . . .
. Y
32.
Seismic analysis of shallow gas zones. . . . . . . . .
. Y N
33.
Seabed condition survey (if off -shore) . . . . . . .
N
APIP.R PATE/
34.
Contact name/Phone for weekly progress reports
Y N
[exploratory only]
GEOLOGY: ENGINEERING: COMMISSION:
.
Comments/Instructions:
LRPA BEW ���� DWJ
JDH mcm P) ,��_
HOW/dlf - A:IFORMSIcheklist rev 01197
Cil
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
******************************
* *
ALASKA COMPUTING CENTER
-------------------------
------- SCHLUMBERGER ----
----------------------------
COMPANY NAME
B.P. EXPLORATION
WELL NAME
5-43 Ll
FIELD NAME
PRUDHOE BAY
BOROUGH
NORTH SLOPE
STATE
ALASKA
API NUMBER
50-029-22754-60
REFERENCE NO
97548
J�71
Date
RECEluty
p
,.;EC 0 u 1997
j
moorage
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 1
Schlumberger Alaska Computing Center
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 97/12/ 2
ORIGIN : FLIC
REEL NAME : 97472
CONTINUATION # :
PREVIOUS REEL .
COMMENT : B.P. EXPLORATION, PRUDHOE BAY S-43 L1, API #50-029-22754-60
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/12/ 2
ORIGIN FLIC
TAPE NAME 97472
CONTINUATION # 1
PREVIOUS TAPE
COMMENT : B.P. EXPLORATION, PRUDHOE BAY S-43 L1, API #50-029-22754-60
TAPE HEADER
35
TOWNSHIP:
PR UDHOE BAY
RANGE:
12E
MWD/MAD LOGS
FSL:
FEL:
WELL NAME:
S-43 Ll
API NUMBER:
KELLY BUSHING:
500292275460
OPERATOR:
66.60
B.P. EXPLORATION
LOGGING COMPANY:
SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE:
29 -OCT -97
#
JOB DATA
BIT RUN 1
BIT RUN 2 BIT RUN 3
JOB NUMBER:
---------
97472
--------- ---------
LOGGING ENGINEER:
BROWN
OPERATOR WITNESS:
WHITELY
SURFACE LOCATION
SECTION:
35
TOWNSHIP:
12N
RANGE:
12E
FNL.
FSL:
FEL:
FWL :
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
68.10
DERRICK FLOOR:
66.60
GROUND LEVEL:
37.20
WELL CASING RECORD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
------------- --------- ----------
1ST STRING 8.500 9.625 3121.0
2ND STRING 6.000 7.000 9760.0
f
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 2
Schlumberger Alaska Computing Center
3RD STRING
PRODUCTION STRING
REMARKS: Well drilled 10 -MAY through 17 -JUN -97 with CDR and ARC5
in 9 bit runs. The CDR was used on runs 1,2 and the
ARC5 was used on runs 3 to 9. No depth shifts were
applied to this data as per Troy Weiss. The PSR in the
edited file is a merge of the CDR PSR and the ARC5
P28H data to provide a continuous log.
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE FLIC
VERSION 001C01
DATE 97/12/ 2
MAX REC SIZE : 1024
FILE TYPE LO
LAST FILE
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
ff
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
MWD 8410.5 14061.0
BASELINE CURVE FOR SHIFTS: NONE
CURVE SHIFT DATA (MEASURED DEPTH)
----------EQUIVALENT UNSHIFTED DEPTH ----------
BASELINE DEPTH MWD
-------------- -------
MERGED DATA SOURCE
LDWG TOOL CODE BIT RUN NO. MERGE TOP MERGE BASE
---------------------------------------------
AffVD 1 8410.5 10691.0
MWD 2 9420.0 11993.0
MWD 3 9870.0 12624.0
MWD 4 9970.0 12815.0
MWD 5 10335.0 10767.0
MWD 6 10691.0 12069.0
14WD 7 11993.0 12705.0
MWD 8 12624.0 12888.0
MWD 9 12815.0 14061.0
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 3
Schlumberger Alaska Computing Center
M
REMARKS: No depth adjustments were made to this data as per
Troy Weiss of BP. This file contains the data from the
CDR run on runs 1, 2 and the ARCS data run on runs 3 to
9. The ARCS data includes both phase shift (PxxH) and
attenuation (AxxH) data. The ARCS data uses LDWG
mnemonics as per Dave Douglas. The RP channel is a
merge of the CDR PSR and the ARCS P28H to provide a
continuous log as per Dave Douglas.
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
SET TYPE - 64BB **
-----------------------------
TYPE REPR CODE VALUE
1
66
0
2
66
0
3
73
64
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
11
66
16
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
0
SET TYPE -
CHAN **
---------------------------------------------------------------------------------------
NAME
SERV
UNIT SERVICE
API
API
API
API
FILE
NUMB
NUMB
SIZE
REPR
PROCESS
ID
ORDER #
LOG
TYPE
CLASS MOD
NUMB
SAMP
ELEM
CODE
(HEX)
---------------------------------------------------------------------------------------
DEPT
FT
00
000
00
0
1
1
1
4
68
0000000000
ROP
MWD
F/HR
00
000
00
0
1
1
1
4
68
0000000000
FET
MWD
HR
00
000
00
0
1
1
1
4
68
0000000000
GR
MWD
GAPI
00
000
00
0
1
1
1
4
68
0000000000
RP
MWD
O=
00
000
00
0
1
1
1
4
68
0000000000
RA
MWD
OHMM
00
000
00
0
1
1
1
4
68
0000000000
RPXX
MWD
OHMM
00
000
00
0
1
1
1
4
68
0000000000
RPX
MWD
OHMM
00
000
00
0
1
1
1
4
68
0000000000
RPS
MWD
OHMM
00
000
00
0
1
1
1
4
68
0000000000
RPM
MWD
OHMM
00
000
00
0
1
1
1
4
68
0000000000
LIS Tape Verification Listing 2 -DEC -1997 17:09
Schlumberger Alaska Computing Center
PAGE: 4
---------------------------------------------------------------------------------------
NAME SERV
UNIT SERVICE API API
API API FILE NUMB NUMB
SIZE REPR PROCESS
ID
ORDER
# LOG TYPE
CLASS MOD NUMB SAMP ELEM
CODE (HEX)
---------------------------------------------------------------------------------------
RPD MWD
OHMM
00 000
00 0 1
1 1
4 68
0000000000
RAXX MWD
ORM4
00 000
00 0 1
1 1
4 68
0000000000
RAX MWD
OHMM
00 000
00 0 1
1 1
4 68
0000000000
RAS MWD
O1-IM11
00 000
00 0 1
1 1
4 68
0000000000
RAM MWD
OHMV
00 000
00 0 1
1 1
4 68
0000000000
RAD MWD
---------------------------------------------------------------------------------------
OHMM
00 000
00 0 1
1 1
4 68
0000000000
** DATA **
DEPT.
14061.000
ROP.MWD
37.040
FET.MWD
-999.250
GR.MWD
-999.250
RP.MWD
-999.250
RA.MWD
-999.250
RPXX.MWD
-999.250
RPX.MWD
-999.250
RPS.MWD
-999.250
RPM.MWD
-999.250
RPD.MWD
-999.250
RAXX.MWD
-999.250
RAX.MWD
-999.250
RAS.MWD
-999.250
RAM.MWD
-999.250
RAD.MWD
-999.250
DEPT.
14000.000
ROP.MWD
32.970
FET.MWD
-999.250
GR.MWD
-999.250
RP.MWD
-999.250
RA.MWD
-999.250
RPXX.MWD
-999.250
RPX.MWD
-999.250
RPS.MWD
-999.250
RPM.MWD
-999.250
RPD.MWD
-999.250
RAXX.MWD
-999.250
RAX.MWD
-999.250
RAS.MWD
-999.250
RAM.MWD
-999.250
RAD.MWD
-999.250
DEPT.
13000.000
ROP.MWD
50.990
FET.MWD
2.727
GR.MWD
54.437
RP.MWD
14.584
RA.MWD
-999.250
RPXX.MWD
10.238
RPX.MWD
11.361
RPS.MWD
13.221
RPM.MWD
14.584
RPD.MWD
14.330
RAXX.MWD
11.467
RAX.MWD
11.702
RAS.MWD
12.453
RAM.MWD
12.822
RAD.MWD
12.544
DEPT.
12000.000
ROP.MWD
50.140
FET.MWD
0.630
GR.MWD
52.377
RP.MWD
14.522
RA.MWD
-999.250
RPXX.MWD
11.150
RPX.MWD
11.693
RPS.MWD
13.255
RPM.MWD
14.522
RPD.MWD
14.160
RAXX.MWD
9.207
RAX.MWD
10.671
RAS.MWD
11.681
RAM.MWD
11.809
RAD.MWD
11.433
DEPT.
11000.000
ROP.MWD
42.060
FET.MWD
2.244
GR.MWD
52.804
RP.MWD
7.369
RA.MWD
-999.250
RPXX.MWD
6.399
RPX.MWD
6.438
RPS.MWD
6.927
RPM.MWD
7.369
RPD.MWD
7.290
RAXX.MWD
6.097
RAX.MWD
6.752
RAS.MWD
7.178
RAM.MWD
7.272
RAD.MWD
7.113
DEPT.
10000.000
ROP.MWD
8.360
FET.MWD
1.491
GR.MWD
393.420
RP.MWD
72.650
RA.MWD
-999.250
RPXX.MWD
18.679
RPX.MWD
29.616
RPS.MWD
48.547
RPM.MWD
72.650
RPD.MWD
87.800
RAXX.MWD
13.627
RAX.MWD
22.272
RAS.MWD
30.874
RAM.MWD
38.174
RAD.MWD
40.290
DEPT.
9000.000
ROP.MWD
31.310
FET.MWD
-999.250
GR.MWD
109.030
RP.MWD
3.793
RA.MWD
2.825
RPXX.MWD
-999.250
RPX.MWD
-999.250
RPS.MWD
-999.250
RPM.MWD
-999.250
RPD.MWD
-999.250
RAXX.MWD
-999.250
RAX.MWD
-999.250
RAS.MWD
-999.250
RAM.MWD
-999.250
RAD.MWD
-999.250
DEPT.
8411.000
ROP.MWD
-999.250
FET.MWD
-999.250
GR.MWD
116.066
RP.MWD
-999.250
RA.MWD
-999.250
RPXX.MWD
-999.250
RPX.MWD
-999.250
RPS.MWD
-999.250
RPM.MWD
-999.250
RPD.MWD
-999.250
RAXX.MWD
-999.250
RAX.MWD
-999.250
RAS.MWD
-999.250
RAM.MWD
-999.250
RAD.MWD
-999.250
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 5
Schlumberger Alaska Computing Center
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : OOIC01
DATE : 97/12/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME
: EDIT .002
SERVICE
: FLIC
VERSION
: OO1C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest passes.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
-------------- ----------- ----------
MAD 9770.0 9873.0
MERGED DATA SOURCE
LDWG TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE
--------------------------------------------------------
REMARKS: This data is from the down MAD pass run on bit run 3.
The data is clipped.
$
LIS FORMAT DATA
LIS Tape Verification Listing 2 -DEC -1997 17:09
Schlumberger Alaska Computing Center
** DATA FORMAT SPECIFICATION RECORD **
SET TYPE - 64EB
PAGE: 6
** DATA **
DEPT. 9873.000
TYPE
REPR CODE
RPX.MAD -999.250 RPS.MAD -999.250 RPM.MAD -999.250
VALUE
RAXX.MAD -999.250 RAX.MAD -999.250 RAS.MAD -999.250
RAM.MAD -999.250
RAD.MAD -999.250
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
11
66
18
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
1
SET TYPE -
CHAN **
---------------------------------------------------------------------------------------
NAME SERV
UNIT SERVICE
API
API
API API FILE
NUMB
NUMB
SIZE
REPR
PROCESS
ID
ORDER #
LOG
TYPE
CLASS MOD
NUMB
SAMP
ELEM
CODE
(HEX)
---------------------------------------------------------------------------------------
DEPT
FT
00
000
00
0
2
1
1
4
68
0000000000
ROP MAD
F/HR
00
000
00
0
2
1
1
4
68
0000000000
FET MAD
HR
00
000
00
0
2
1
1
4
68
0000000000
GR MAD
GAPI
00
000
00
0
2
1
1
4
68
0000000000
RPXX MAD
01Hviff
00
000
00
0
2
1
1
4
68
0000000000
RPX MAD
OHW4
00
000
00
0
2
1
1
4
68
0000000000
RPS MAD
OHMM
00
000
00
0
2
1
1
4
68
0000000000
RPM MAD
OH1f1
00
000
00
0
2
1
1
4
68
0000000000
RPD MAD
OHMRT
00
000
00
0
2
1
1
4
68
0000000000
RAXX MAD
O=
00
000
00
0
2
1
1
4
68
0000000000
RAX MAD
O=
00
000
00
0
2
1
1
4
68
0000000000
RAS MAD
O=
00
000
00
0
2
1
1
4
68
0000000000
RAM MAD
01HOT
00
000
00
0
2
1
1
4
68
0000000000
RAD MAD
---------------------------------------------------------------------------------------
OHWT
00
000
00
0
2
1
1
4
68
0000000000
** DATA **
DEPT. 9873.000
ROP.MAD 153.850 FET.MAD -999.250 GR.MAD -999.250
RPXX.MAD -999.250
RPX.MAD -999.250 RPS.MAD -999.250 RPM.MAD -999.250
RPD.MAD -999.250
RAXX.MAD -999.250 RAX.MAD -999.250 RAS.MAD -999.250
RAM.MAD -999.250
RAD.MAD -999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
DEPT. 9770.000 ROP.MAD
RPXX.MAD 5.696 RPX.MAD
RPD.MAD 8.000 RAXX.MAD
RAM.MAD 3.896 RAD.MAD
END OF DATA
**** FILE TRAILER ****
FILE NAME
: EDIT .002
SERVICE
: FLIC
VERSION
: OO1C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
**** FILE HEADER ****
FILE NAME
: EDIT .003
SERVICE
: FLIC
VERSION
: OO1C01
DATE
: 97/12/ 2
MAX REC SIZE
1024
FILE TYPE
: LO
LAST FILE
2 -DEC -1997 17:09
88.680 FET.MAD
6.093 RPS. MAD
1.389 RAX.MAD
4.777
PAGE: 7
0.258 GR.MAD 105.299
7.230 RPM.MAD 8.223
2.156 RAS.MAD 3.002
FILE HEADER
FILE NUMBER: 3
EDITED MAD PASSES
Depth shifted and clipped curves; for each pass of each run in separate files.
MAD RUN NUMBER: 1
MAD PASS NUMBER. 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
-------------- ----------- ----------
MAD 9770.0 9873.0
BASELINE CURVE FOR SHIFTS: NONE
CURVE SHIFT DATA (MEASURED DEPTH)
----------EQUIVALENT UNSHIFTED DEPTH ----------
BASELINE DEPTH MAD
-------------- -------
REMARKS: This data is from the down MAD pass run on bit run 3.
The data is clipped.
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 8
Schlumberger Alaska Computing Center
LIS FORMAT DATA
DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
* * DATA * *
TYPE
REPR CODE
VALUE
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
11
66
18
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
1
SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME
SERV
UNIT SERVICE
API
API
API
API FILE
NUMB
NUMB
SIZE
REPR
PROCESS
ID
ORDER #
LOG
TYPE
CLASS MOD
NUMB
SAMP
ELEM
CODE
(HEX)
---------------------------------------------------------------------------------------
DEPT
FT
00
000
00
0 3
1
1
4
68
0000000000
ROP
MAD
F/HR
00
000
00
0 3
1
1
4
68
0000000000
FET
MAD
HR
00
000
00
0 3
1
1
4
68
0000000000
GR
MAD
GAPI
00
000
00
0 3
1
1
4
68
0000000000
RPXX
MAD
OHMD1
00
000
00
0 3
1
1
4
68
0000000000
RPX
MAD
OHMM
00
000
00
0 3
1
1
4
68
0000000000
RPS
MAD
OIHVM
00
000
00
0 3
1
1
4
68
0000000000
RPM
MAD
OHMV
00
000
00
0 3
1
1
4
68
0000000000
RPD
MAD
OH1v1M
00
000
00
0 3
1
1
4
68
0000000000
RAXX
MAD
OHMM
00
000
00
0 3
1
1
4
68
0000000000
RAX
MAD
OHMM
00
000
00
0 3
1
1
4
68
0000000000
RAS
MAD
OHMM
00
000
00
0 3
1
1
4
68
0000000000
RAM
MAD
OHMM
00
000
00
0 3
1
1
4
68
0000000000
RAD
---------------------------------------------------------------------------------------
MAD
OHPw
00
000
00
0 3
1
1
4
68
0000000000
* * DATA * *
LIS Tape Verification Listing
2 -DEC -1997 17:09
PAGE: 9
Schlumberger
Alaska Computing Center
VERSION
: OO1C01
DEPT.
9873.000 ROP.MAD
153.850 FET.MAD
-999.250 GR.MAD -999.250
RPXX.MAD
-999.250 RPX.MAD
-999.250 RPS.MAD
-999.250 RPM.MAD -999.250
RPD.MAD
-999.250 RAXX.MAD
-999.250 RAX.MAD
-999.250 RAS.MAD -999.250
RAM.NIAD
-999.250 RAD.MAD
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : 001C01
DATE : 97/12/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME
: EDIT .004
SERVICE
: FLIC
VERSION
: OO1C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
FILE HEADER
FILE NUMBER 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREN NT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
STOP DEPTH
---------------- -----------
MWD 8411.0
----------
9459.0
#
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION:
S.OB
DATA TYPE (TJF- ORY or REAL-TIME) :
MEMORY
TD DRILLER (FT) :
14061.0
TOP LOG INTERVAL (FT) :
8410.5
BOTTOM LOG INTERVAL (FT):
14061.0
{
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 10
Schlumberger Alaska Computing Center
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
---------------- ---------
CDR RESIST./GR
-----------
CDR -7027
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
BOREHOLE CONDITIONS
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT) :
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT) :
0.045 155.0
MUD CAKE AT (MT)
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN)
EWR FREQUENCY (HZ):
20000
REMARKS: CDR RUN ON RUNS 1,2
ARC5 RUN ON RUNS 3 - 9
HOLE ANGLE AT TD = 97.8 DEG @ 14061'
CDR RUN IN 8.5" HOLE
ARCS RUN IN 6" HOLE
WELL IS LATERAL OF 5-43
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE
LIS FORMAT DATA
LIS Tape Verification Listing
2 -DEC -1997 17:09
PAGE: 11
Schlumberger
Alaska Computing Center
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
------------------------------
TYPE REPR CODE
VALUE
------------------------------
1 66
0
2 66
0
3 73
20
4 66
1
5 66
6 73
7 65
8 68
0.5
9 65
FT
11 66
51
12 68
13 66
0
14 65
FT
15 66
68
16 66
1
0 66
------------------------------
1
SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV
UNIT SERVICE API API
API API FILE
NUMB NUMB
SIZE REPR PROCESS
ID
ORDER # LOG TYPE
CLASS MOD NUMB
SAMP ELEM
CODE
(HEX)
---------------------------------------------------------------------------------------
DEPT
FT 00 000
00 0 4
1 1
4 68
0000000000
ROP5 LWI
F/HR 00 000
00 0 4
1 1
4 68
0000000000
GR LWI
GAPI 00 000
00 0 4
1 1
4 68
0000000000
PSR LWI
OHMM 00 000
00 0 4
1 1
4 68
0000000000
ATR LWI
---------------------------------------------------------------------------------------
OHMM 00 000
00 0 4
1 1
4 68
0000000000
* * DATA
* *
DEPT.
9459.000 ROP5.LW1
14.350
GR.LW1
-999.250
PSR.LW1
-999.250
ATR.LW1
-999.250
DEPT.
9000.000 ROP5.LW1
31.310
GR.LW1
109.030
PSR.LW1
3.793
ATR.LW1
2.825
DEPT.
8410.500 ROP5.LW1
-999.250
GR.LW1
115.206
PSR.LW1
1.174
ATR.LW1
1.251
** END OF DATA **
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 12
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME
: EDIT .004
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT):
**** FILE HEADER ****
FILE NAME
: EDIT .005
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT):
FILE HEADER
FILE NUMBER 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: 0.5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
-------------------------------------
PfffD 9420.0 9770.0
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION:
5.0B
DATA TYPE (MEMORY or REAL-TIME) :
MEMORY
TD DRILLER (FT) :
14061. 0
TOP LOG INTERVAL (FT) :
8410.5
BOTTOM LOG INTERVAL (FT):
14061.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE.
45.0
MAXIMUM ANGLE:
61.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
---------------- ---------
CDR RESIST./GR
-----------
CDR -7027
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 13
Schlumberger Alaska Computing Center
BOREHOLE AND CASING DATA
66
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
3
73
BOREHOLE CONDITIONS
4
MUD TYPE.
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
6
MUD PH:
MUD CHLORIDES (PPM)
65
FLUID LOSS (C3):
8
RESISTIVITY (OHM) AT TEMPERATURE (DEGF):
0.5
MUD AT MEASURED TEMPERATURE (MT):
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT):
0.045 155.0
MUD CAKE AT (MT)
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (-IN):
EWR FREQUENCY (HZ):
20000
REMARKS: CDR RUN ON RUNS 1,2
ARCS RUN ON RUNS 3 - 9
HOLE ANGLE AT TD = 97.8 DEG @ 14061'
CDR RUN IN 8.5" HOLE
ARC5 RUN IN 6" HOLE
WELL IS LATERAL OF 5-43
MAD PASS DATA COLLECTED (ARC5 ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
SET TYPE - 64EB **
-----------------------------
TYPE REPR CODE VALUE
1
66
0
2
66
0
3
73
20
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 14
Schlumberger Alaska Computing Center
----------------------------
TYPE REPR CODE VALUE
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
------------------------------
SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 00 000 00 0 5 1 1 4 68 0000000000
ROPS LW2 F/HR 00 000 00 0 5 1 1 4 68 0000000000
GR LW2 GAPI 00 000 00 0 5 1 1 4 68 0000000000
PSR LW2 OHM4 00 000 00 0 5 1 1 4 68 0000000000
ATR LW2 OlvqM 00 000 00 0 5 1 1 4 68 0000000000
---------------------------------------------------------------------------------------
* * DATA * *
DEPT. 9770.000 ROP5.LW2 88.680 GR.LW2 109.239 PSR.LW2 9.009
ATR. LW2 8.192
DEPT. 9420.000 ROP5.LW2 -999.250 GR.LW2 130.600 PSR.LW2 -999.250
ATR.LW2 -999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME
: EDIT .005
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE FLIC
VERSION : 001C01
DATE : 97/12/ 2
MAX REC SIZE 1024
FILE TYPE : LO
LAST FILE
2 -DEC -1997 17:09
FILE HEADER
FILE NUMBER 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: 0.5000
u
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
---------------- ----------- ----------
MWD 9870.0 10043.0
#
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
VS R24
DOWNHOLE SOFTWARE VERSION:
5.OB
DATA TYPE (MEMORY or REAL-TIME):
MEMORY
TD DRILLER (FT) :
14061.0
TOP LOG INTERVAL (FT) .
8410.5
BOTTOM LOG INTERVAL (FT) :
14061.0
BIT ROTATING SPEED (RPM)
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
---------------- ---------
ARCS RESIST./GR
-----------
ARC5-063
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
#
BOREHOLE CONDITIONS
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
PAGE: 15
LIS Tape Verification Listing 2 -DEC -1997 17:09 PAGE: 16
Schlumberger Alaska Computing Center
FLUID LOSS (C3) :
RESISTIVITY (ORM AT TEMPERATURE (DEGF)
64EB **
MUD AT MEASURED TEMPERATURE (MT):
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
VALUE
MUD FILTRATE AT (MT) :
0.045 155.0
MUD CAKE AT (MT)
2
#
0
NEUTRON TOOL
73
MATRIX:
4
MATRIX DENSITY:
1
HOLE CORRECTION (IN):
66
6
TOOL STANDOFF (IN)
EWR FREQUENCY (HZ) :
20000
8
REMARKS: CDR RUN ON RUNS 1,2
0.5
ARCS RUN ON RUNS 3 - 9
65
HOLE ANGLE AT TD = 97.8 DEG Ca 14061'
11
CDR RUN IN 8.5" HOLE
18
ARC5 RUN IN 6" HOLE
68
WELL IS LATERAL OF 5-43
13
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE
65
FT
15
66
68
LIS FORMAT DATA
66
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE -
64EB **
------------------------------
TYPE
REPR CODE
VALUE
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
11
66
18
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
1
LIS Tape Verifica-,on Listing 2 -DEC -1997 17:09 PAGE: 17
Schlumberger Alaska Computing Center
** SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 00 000 00 0 6 1 1 4 68 0000000000
ROP5 LW3 FIHR 00 000 00 0 6 1 1 4 68 0000000000
TABR LW3 HR 00 000 00 0 6 1 1 4 68 0000000000
GR LW3 GAPI 00 000 00 0 6 1 1 4 68 0000000000
P10H LW3 01941 00 000 00 0 6 1 1 4 68 0000000000
P16H LW3 OHIM�1 00 000 00 0 6 1 1 4 68 0000000000
P22H LW3 ORMN 00 000 00 0 6 1 1 4 68 0000000000
P28H LW3 OHMM 00 000 00 0 6 1 1 4 68 0000000000
P34H LW3 OHMN1 00 000 00 0 6 1 1 4 68 0000000000
A10H LW3 OHM4 00 000 00 0 6 1 1 4 68 0000000000
Al 6H LW3 OHMM 00 000 00 0 6 1 1 4 68 0000000000
A22H LW3 ORM 00 000 00 0 6 1 1 4 68 0000000000
A28H LW3 01941 00 000 00 0 6 1 1 4 68 0000000000
A34H LW3 OHMM 00 000 00 0 6 1 1 4 68 0000000000
---------------------------------------------------------------------------------------
* * DATA * *
DEPT. 10043.000 ROP5.LW3 72.870 TABR.LW3 -999.250 GR.LW3 -999.250
P10H.LW3 -999.250 P16H.LW3 -999.250 P22H.LW3 -999.250 P28H.LW3 -999.250
P34H.LW3 -999.250 A10H.LW3 -999.250 A16H.LW3 -999.250 A22H.LW3 -999.250
A28H.LW3 -999.250 A34H.LW3 -999.250
DEPT. 10000.000 ROP5.LW3 8.360 TABR.LW3 -999.250 GR.LW3 -999.250
P10H.LW3 -999.250 P16H.LW3 -999.250 P22H.LW3 -999.250 P28H.LW3 -999.250
P34H.LW3 -999.250 A10H.LW3 -999.250 A16H.LW3 -999.250 A22H.LW3 -999.250
A28H.Lf%T3 -999.250 A34H.LW3 -999.250
DEPT. 9870.000 ROP5.LW3 233.770 TABR.LW3 4.690 GR.LW3 86.403
P10H.LW3 60.565 P16H.LW3 73.891 P22H.LW3 128.512 P28H.LW3 196.759
P34H.LW3 150.080 A10H.LW3 39.411 A16H.LW3 300.000 A22H.LW3 300.000
A28H.LW3 300.000 A34H.LW3 295.953
** END OF DATA **
**** FILE TRAILER ****
FILE NAME
: EDIT .006
SERVICE
: FLIC
VERSION
: OO1col
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 18
Schlumberger Alaska Computing Center
**** FILE HEADER ****
FILE NAME
: EDIT .007
SERVICE
: FLIC
VERSION
: 001c01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT):
FILE HEADER
FILE NUMBER 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: 0.5000
FILE SNOTARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
---------------- ----------- ----------
MWD 9970.0 10414.0
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION.
V5 R24
DOWNHOLE SOFTWARE VERSION:
5.OB
DATA TYPE (MEMORY or REAL-TIME) :
MEMORY
TD DRILLER (FT) :
14061.0
TOP LOG INTERVAL (FT):
8410.5
BOTTOM LOG INTERVAL (FT):
14061.0
BIT ROTATING SPEED (RPM) .
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
-------------------------
ARC5 RESIST./GR
-----------
ARC5-063
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
BOREHOLE CONDITIONS
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
ice..
LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 19
Schlumberger Alaska Computing Center
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): 0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT): 0.045 155.0
MUD CAKE AT (MT) :
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ): 20000
REMARKS: CDR RUN ON RUNS 1,2
ARCS RUN ON RUNS 3 - 9
HOLE ANGLE AT TD = 97.8 DEG Ca 14061'
CDR RUN IN 8.5" HOLE
ARCS RUN IN 6" HOLE
WELL IS LATERAL OF 5-43
MAD PASS DATA COLLECTED (ARC5 ONLY) 9873'-9770'
DATA FROM DOWNHOLE MEMORY, V5. OB SOFTWARE
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE
- 64 -EB **
------------------------------
TYPE
REPR CODE
VALUE
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
11
66
18
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
1
LIS Tape Verifica,ion Listing 2 -DEC -1997 17:09 PAGE: 20
Schlumberger Alaska Computing Center
DATA
DEPT.
** SET TYPE - CHAN **
ROP5.LW4
80.360
TABR.LW4
-999.250
GR.LW4
-999.250
P10H.LW4
-999.250
P16H.LW4
---------------------------------------------------------------------------------------
NAME SERV
UNIT SERVICE
API
API
API
API FILE
NUMB
NUMB
SIZE
REPR
PROCESS
ID
ORDER #
LOG TYPE
-999.250
CLASS MOD
NUMB
SAMP
ELEM
CODE
(HEX)
---------------------------------------------------------------------------------------
DEPT
FT
00
000
00
0
7
1
1
4
68
0000000000
ROP5 LW4
F/11R
00
000
00
0
7
1
1
4
68
0000000000
TABR LW4
HR
00
000
00
0
7
1
1
4
68
0000000000
GR LW4
GAPI
00
000
00
0
7
1
1
4
68
0000000000
P10H LW4
0194M
00
000
00
0
7
1
1
4
68
0000000000
P16H LW4
OHMM
00
000
00
0
7
1
1
4
68
0000000000
P22H LW4
OHMV
00
000
00
0
7
1
1
4
68
0000000000
P28H LW4
0194M
00
000
00
0
7
1
1
4
68
0000000000
P34H LW4
OHMM
00
000
00
0
7
1
1
4
68
0000000000
A10H LW4
Offi4l
00
000
00
0
7
1
1
4
66
0000000000
A16H LW4
OHWT
00
000
00
0
7
1
1
4
68
0000000000
A22H LW4
ORMN
00
000
00
0
7
1
1
4
68
0000000000
A28H LW4
0194M
00
000
00
0
7
1
1
4
68
0000000000
A34H LW4
---------------------------------------------------------------------------------------
Oftel
00
000
00
0
7
1
1
4
68
0000000000
DATA
DEPT.
10414.000
ROP5.LW4
80.360
TABR.LW4
-999.250
GR.LW4
-999.250
P10H.LW4
-999.250
P16H.LW4
-999.250
P22H.LW4
-999.250
P28H.LW4
-999.250
P34H.LW4
-999.250
A10H.LW4
-999.250
A16H.LW4
-999.250
A22H.LW4
-999.250
A28H.LW4
-999.250
A34H.LW4
-999.250
DEPT.
10000.000
ROP5.LW4
-999.250
TABR.LW4
1.491
GR.LW4
393.420
P10H.LW4
18.679
P16H.LW4
29.616
P22H.LW4
48.547
P28H.LW4
72.650
P34H.LW4
87.800
A10H.LW4
13.627
A16H.LW4
22.272
A22H.LW4
30.874
A28H.LW4
38.174
A34H.LW4
40.290
DEPT.
9970.000
ROP5.LW4
-999.250
TABR.LW4
-999.250
GR.LW4
56.717
P10H.LW4
-999.250
P16H.LW4
-999.250
P22H.LW4
-999.250
P28H.LW4
-999.250
P34H.LW4
-999.250
A10H.LW4
-999.250
A16H.LW4
-999.250
A22H.LW4
-999.250
A28H.LW4
-999.250
A34H.LW4
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME
EDIT .007
SERVICE
FLIC
VERSION
001C01
DATE
97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 21
Schlumberger Alaska Computing Center
**** FILE HEADER ****
FILE NAME
: EDIT .008
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT) :
FILE HEADER
FILE NUMBER 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: 0.5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
---------------- ----------- ----------
MWD 10335.0 10767.0
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION:
5.OB
DATA TYPE (MEMORY or REAL-TIME):
MEMORY
TD DRILLER (FT) :
14061.0
TOP LOG INTERVAL (FT):
8410.5
BOTTOM LOG INTERVAL (FT) :
14061.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
-------------------------
ARC5 RESIST./GR
-----------
ARC5-063
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
BOREHOLE CONDITIONS
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
LIS Tape Verifica—Lon Listing 2 -DEC -1997 17:09 PAGE: 22
Schlumberger Alaska Computing Center
FLUID LOSS (C3);
RESISTIVITY (OM4N) AT TEMPERATURE (DEGF)
- 64BB **
MUD AT MEASURED TEMPERATURE (MT):
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
VALUE
MUD FILTRATE AT (MT):
0.045 155.0
MUD CAKE AT (MT) :
2
66
0
NEUTRON TOOL
73
MATRIX:
4
MATRIX DENSITY:
1
HOLE CORRECTION (IN):
66
6
TOOL STANDOFF (IN) :
EWR FREQUENCY (N_Z) :
20000
8
REMARKS: CDR RUN ON RUNS 1,2
0.5
ARCS RUN ON RUNS 3 - 9
65
HOLE ANGLE AT TD = 97.8 DEG @ 14061'
11
CDR RUN IN 8.5" HOLE
18
ARCS RUN IN 6" HOLE
68
WELL IS LATERAL OF 5-43
13
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, VS.OB SOFTWARE
65
FT
#
66
LIS FORMAT DATA
16
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE
- 64BB **
------------------------------
TYPE
REPR CODE
VALUE
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
11
66
18
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
1
LIS Tape Verifica,,on Listing 2 -DEC -1997 17:09
Schlumberger Alaska Computing Center
PAGE: 23
* * DATA * *
DEPT.
** SET TYPE - CHAN **
ROP5.LW5
54.880
TABR.LW5
P10H.LW5
-999.250
P16H.LW5
-999.250
P22H.LW5
---------------------------------------------------------------------------------------
NAME SERV
UNIT SERVICE
API
API
API
API
FILE
NUMB
NUMB
SIZE
REPR
PROCESS
ID
ORDER #
LOG
TYPE
CLASS MOD
NUMB
SAMP
ELEM
P34H.LW5
CODE
(HEX)
---------------------------------------------------------------------------------------
DEPT
FT
00
000
00
0
8
1
1
4
68
0000000000
ROPS LW5
F/HR
00
000
00
0
8
1
1
4
68
0000000000
TABR LW5
HR
00
000
00
0
8
1
1
4
68
0000000000
GR LWS
GAPI
00
000
00
0
8
1
1
4
68
0000000000
P10H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
P16H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
P22H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
P28H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
P34H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
A10H LW5
0124M
00
000
00
0
8
1
1
4
68
0000000000
A16H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
A22H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
A28H LW5
OHMM
00
000
00
0
8
1
1
4
68
0000000000
A34H LW5
---------------------------------------------------------------------------------------
OHMM
00
000
00
0
8
1
1
4
68
0000000000
* * DATA * *
DEPT.
10767.000
ROP5.LW5
54.880
TABR.LW5
P10H.LW5
-999.250
P16H.LW5
-999.250
P22H.LW5
P34H.LW5
-999.250
A10H.LW5
-999.250
A16H.LW5
A28H.LW5
-999.250
A34H.LW5
-999.250
DEPT.
10335.000
ROP5.LW5
-999.250
TABR.LWS
P10H.LW5
-999.250
P16H.LW5
-999.250
P22H.LW5
P34H.LW5
-999.250
A10H.LW5
-999.250
A16H.LW5
A28H.LW5
-999.250
A34H.LW5
-999.250
* * END OF DATA * *
**** FILE TRAILER ****
FILE NAME
: EDIT .008
SERVICE
: FLIC
VERSION
001C01
DATE
97/12/ 2
MAX REC SIZE
1024
FILE TYPE
LO
LAST FILE
-999.250
-999.250
GR.LWS
-999.250
-999.250
P28H.LW5
-999.250
-999.250
A22H.Lb95
-999.250
-999.250
GR.LWS
59.700
-999.250
P28H.LW5
-999.250
-999.250
A22H.LW5
-999.250
LIS Tape Verifica—Lon Listing 2 -DEC -1997 17:09 PAGE: 24
Schlumberger Alaska Computing Center
**** FILE HEADER ****
FILE NAME
: EDIT .009
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT) :
FILE HEADER
FILE NUMBER 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
---------------- ----------- ----------
MWD 10691.0 12069.0
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION:
S.OB
DATA TYPE (MEMORY or REAL-TIME) :
MEMORY
TD DRILLER (FT) :
14061.0
TOP LOG INTERVAL (FT).
8410.5
BOTTOM LOG INTERVAL (FT) :
14061.0
BIT ROTATING SPEED (RPM)
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
---------------- ---------
ARCS RESIST./GR
-----------
ARC5-063
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT).
3121.0
BOREHOLE CONDITIONS
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G) :
8.80
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
LIS Tape Verifica,lon Listing 2 -DEC -1997 17:09 PAGE: 25
Schlumberger Alaska Computing Center
FLUID LOSS (C3) :
RESISTIVITY (OHMK) AT TEMPERATURE (DEGF) :
64EB **
MUD AT MEASURED TEMPERATURE (MT) :
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
VALUE
MUD FILTRATE AT (MT) :
0.045 155.0
14M CAKE AT (MT)
2
#
0
NEUTRON TOOL
73
MATRIX:
4
MATRIX DENSITY:
1
HOLE CORRECTION (IN):
66
6
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
8
REMARKS: CDR RUN ON RUNS 1,2
0.5
ARCS RUN ON RUNS 3 - 9
65
HOLE ANGLE AT TD = 97.8 DEG @ 14061'
11
CDR RUN IN 8.5" HOLE
18
ARCS RUN IN 6" HOLE
68
WELL IS LATERAL OF 5-43
13
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, V5.OB SOFTWARE
65
FT
15
66
68
LIS FORMAT DATA
66
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE -
64EB **
------------------------------
TYPE
REPR CODE
VALUE
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
11
66
18
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
1
LIS Tape Verifica,-Lon Listing 2 -DEC -1997 17:09
Schlumberger Alaska Computing Center
PAGE: 26
** SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 00 000 00 0 9 1 1 4 68 0000000000
ROP5 LW6 F/HR 00 000 00 0 9 1 1 4 68 0000000000
TABR LW6 HR 00 000 00 0 9 1 1 4 68 0000000000
GR LW6 GAPI 00 000 00 0 9 1 1 4 68 0000000000
P10H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
P16H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
P22H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
P28H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
P34H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
A10H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
A16H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
A22H LW6 OHMq 00 000 00 0 9 1 1 4 68 0000000000
A28H LW6 ORWI 00 000 00 0 9 1 1 4 68 0000000000
A34H LW6 OHMM 00 000 00 0 9 1 1 4 68 0000000000
---------------------------------------------------------------------------------------
* * DATA * *
DEPT. 12069.000 ROP5.LW6 37.250 TABR.LW6 -999.250 GR.LW6 -999.250
P10H.LW6 -999.250 P16H.LW6 -999.250 P22H.LW6 -999.250 P28H.LW6 -999.250
P34H.LW6 -999.250 A10H.LW6 -999.250 A16H.LW6 -999.250 A22H.LW6 -999.250
A28H.LW6 -999.250 A34H.LW6 -999.250
DEPT. 12000.000 ROP5.LW6 50.140 TABR.LW6 -999.250 GR.LW6 -999.250
P10H.LW6 -999.250 P16H.LW6 -999.250 P22H.LW6 -999.250 P28H.LW6 -999.250
P34H.LW6 -999.250 A10H.LW6 -999.250 A16H.LW6 -999.250 A22H.LW6 -999.250
A28H.LW6 -999.250 A34H.LW6 -999.250
DEPT. 11000.000 ROP5.LW6 42.060 TABR.LW6 2.244 GR.LW6 52.804
P10H.LW6 6.399 P16H.LW6 6.438 P22H.LW6 6.927 P28H.LW6 7.369
P34H.LW6 7.290 A10H.LW6 6.097 A16H.LW6 6.752 A22H.LW6 7.178
A28H.LW6 7.272 A34H.LW6 7.113
DEPT. 10691.000 ROP5.LW6 -999.250 TABR.LW6 -999.250 GR.LW6 54.605
P10H.LW6 -999.250 P16H.LW6 -999.250 P22H.LW6 -999.250 P28H.LW6 -999.250
P34H.LW6 -999.250 A10H.LW6 -999.250 A16H.LW6 -999.250 A22H.LW6 -999.250
A28H.LW6 -999.250 A34H.LW6 -999.250
** END OF DATA **
LIS Tape Verificat--Lon Listing 2 -DEC -1997 17:09 PAGE: 27
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME
: EDIT .009
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT) :
**** FILE HEADER ****
FILE NAME
: EDIT .010
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT) :
FILE HEADER
17 -JUN -97
FILE NUMBER
10
RAW MWD
V5 R24
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
7
DEPTH INCREMENT:
0.5000
14061.0
TOP LOG INTERVAL (FT):
FILE SUMMARY
BOTTOM LOG INTERVAL (FT) :
VENDOR TOOL CODE
START DEPTH STOP DEPTH
----------------
MWD
----------- ----------
11993.0 12705.0
MINIMUM ANGLE:
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION:
S.OB
DATA TYPE (MEMORY or REAL-TIME) :
MEMORY
TD DRILLER (FT):
14061.0
TOP LOG INTERVAL (FT):
8410.5
BOTTOM LOG INTERVAL (FT) :
14061.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
---------------- ---------
ARCS RESIST./GR
-----------
ARC5-063
$
LIS Tape Verifica,lon Listing 2 -DEC -1997 17:09 PAGE: 28
Schlumberger Alaska Computing Center
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
BOREHOLE CONDITIONS
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM)
FLUID LOSS (C3) :
RESISTIVITY (OIR4M) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT).
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT):
0.045 155.0
MUD CAKE AT (MT) :
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: CDR RUN ON RUNS 1,2
ARCS RUN ON RUNS 3 - 9
HOLE ANGLE AT TD = 97.8 DEG 14061'
CDR RUN IN 8.5" HOLE
ARCS RUN IN 6" HOLE
WELL IS LATERAL OF S-43
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, V5.0B SOFTWARE
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
------------------------------
TYPE REPR CODE VALUE
------------------------------
1 66 0
2 66 0
3 73 56
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
LIS Tape Verifica,-on Listing 2 -DEC -1997 17:09 PAGE. 29
Schlumberger Alaska Computing Center
------------------------------
TYPE REPR CODE VALUE
11 66 18
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
------------------------------
SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 00 000 00 0 10 1 1 4 68 0000000000
ROPS LW7 F/14R 00 000 00 0 10 1 1 4 68 0000000000
TABR LW7 HR 00 000 00 0 10 1 1 4 68 0000000000
GR LW7 GAPI 00 000 00 0 10 1 1 4 68 0000000000
P10H LW7 OHMM 00 000 00 0 10 1 1 4 68 0000000000
P16H LW7 OHM 00 000 00 0 10 1 1 4 68 0000000000
P22H LW7 OHMM 00 000 00 0 10 1 1 4 68 0000000000
P28H LW7 01M1 00 000 00 0 10 1 1 4 68 0000000000
P34H LW7 OHW 00 000 00 0 10 1 1 4 68 0000000000
A10H LW7 OHMM 00 000 00 0 10 1- 1 4 68 0000000000
A16H LW7 OEM 00 000 00 0 10 1 1 4 68 0000000000
A22H LP17 OM4M 00 000 00 0 10 1 1 4 68 0000000000
A28H LW7 OHMT 00 000 00 0 10 1 1 4 68 0000000000
A34H LW7 OEM 00 000 00 0 10 1 1 4 68 0000000000
---------------------------------------------------------------------------------------
* * DATA * *
DEPT. 12705.000 ROP5.LW7 15.910 TABR.LW7 -999.250 GR.LW7 -999.250
P10H.LW7 -999.250 P16H.LW7 -999.250 P22H.LW7 -999.250 P28H.LW7 -999.250
P34H.LW7 -999.250 A10H.LW7 -999.250 A16H.LW7 -999.250 A22H.LW7 -999.250
A28H.LW7 -999.250 A34H.LW7 -999.250
DEPT. 12000.000 ROP5.LW7 -999.250 TABR.LW7 0.630 GR.LW7 52.377
P10H.LW7 11.150 P16H.LW7 11.693 P22H.LW7 13.255 P28H.LW7 14.522
P34H.LW7 14.160 A10H.LW7 9.207 A16H.LW7 10.671 A22H.LW7 11.681
A28H.LW7 11.809 A34H.LW7 11.433
DEPT. 11993.000 ROP5.LW7 -999.250 TABR.LW7 -999.250 GR.LW7 47.309
P10H.LW7 -999.250 P16H.LW7 -999.250 P22H.LW7 -999.250 P28H.LW7 -999.250
P34H.LW7 -999.250 A10H.LW7 -999.250 A16H.LW7 -999.250 A22H.LW7 -999.250
A28H.LW7 -999.250 A34H.LW7 -999.250
** END OF DATA **
LIS Tape Verifica,�on Listing 2 -DEC -1997 17:09 PAGE: 30
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME
: EDIT .010
SERVICE
: FLIC
VERSION
: OOICOl
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT) :
**** FILE HEADER ****
FILE NAME
: EDIT .011
SERVICE
: FLIC
VERSION
: 001C01
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT) :
FILE HEADER
17 -JUN -97
FILE NUMBER
I1
RAW MWD
V5 R24
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
8
DEPTH INCREMENT:
0.5000
14061.0
TOP LOG INTERVAL (FT) :
FILE SUMMARY
BOTTOM LOG INTERVAL (FT) :
VENDOR TOOL CODE
START DEPTH STOP DEPTH
MWD
12624.0 12888.0
MINIMUM ANGLE:
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION:
S.OB
DATA TYPE (MEMORY or REAL-TIME):
MEMORY
TD DRILLER (FT).
14061.0
TOP LOG INTERVAL (FT) :
8410.5
BOTTOM LOG INTERVAL (FT) :
14061.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
-------------------------
ARC5 RESIST./GR
-----------
ARCS -063
$
LIS Tape Verificau,on Listing 2 -DEC -1997 17:09 PAGE: 31
Schlumberger Alaska Computing Center
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN).
8.500
DRILLERS CASING DEPTH (FT):
3121.0
REPR CODE
VALUE
BOREHOLE CONDITIONS
66
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
73
MUD PH:
4
MUD CHLORIDES (PPM):
1
FLUID LOSS (C3).
66
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
6
MUD AT MEASURED TEMPERATURE (MT) :
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
65
MUD FILTRATE AT (MT) :
0.045 155.0
MUD CAKE AT (MT)
0.5
9
65
NEUTRON TOOL
MATRIX.
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: CDR RUN ON RUNS 1,2
ARCS RUN ON RUNS 3 - 9
HOLE ANGLE AT TD = 97.8 DEG @ 14061'
CDR RUN IN 8.5" HOLE
ARC5 RUN IN 6" HOLE
WELL IS LATERAL OF 5-43
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, VS. OB SOFTWARE
#
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE -
64EB **
------------------------------
TYPE
REPR CODE
VALUE
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
LIS Tape Verifica,-Lon Listing 2 -DEC -1997 17:09 PAGE: 32
Schlumberger Alaska Computing Center
** DATA **
DEPT. 12888.000 ROP5.LW8
P10H.LW8 -999.250 P16H.LW8
P34H.LW8 -999.250 A10H.LW8
A28H.LW8 -999.250 A34H.LW8
DEPT. 12624.000 ROP5.LW8
P10H.LW8 -999.250 P16H.LW8
P34H.LW8 -999.250 A10H.LW8
A28H.LW8 -999.250 A34H.LW8
** END OF DATA **
176.470 TABR.LW8
-999.250 P22H.LW8
-999.250 A16H.LW8
-999.250
-999.250 TABR.LW8
-999.250 P22H.LW8
-999.250 A16H.LW8
-999.250
-999.250
GR.LW8
------------------------------
TYPE
REPR CODE
VALUE
-999.250
-999.250
A22H.LW8
-999.250
-999.250
GR.LW8
54.036
-999.250
------------------------------
11
66
-999.250
18
-999.250
12
68
13
66
0
14
65
FT
15
66
68
16
66
1
0
------------------------------
66
1
SET TYPE -
CHAN **
---------------------------------------------------------------------------------------
NAME
SERV
UNIT SERVICE API
API
API API
FILE
NUMB
NUMB
SIZE
REPR
PROCESS
ID
ORDER
# LOG
TYPE
CLASS MOD
NUMB
SAMP
ELEM
CODE
(HEX)
---------------------------------------------------------------------------------------
DEPT
FT
00
000
00 0
11
1
1
4
68
0000000000
ROPS
LW8
F/HR
00
000
00 0
11
1
1
4
68
0000000000
TABR
LW8
HR
00
000
00 0
11
1
1
4
68
0000000000
GR
LW8
GAPI
00
000
00 0
11
1
1
4
68
0000000000
P10H
LW8
OHMM
00
000
00 0
11
1
1
4
68
0000000000
P1 6,U
LW8
ORW
00
000
00 0
11
1
1
4
68
0000000000
P22H
LW8
ORM
00
000
00 0
11
1
1
4
68
0000000000
P28H
LW8
OHMM
00
000
00 0
11
1
1
4
68
0000000000
P34H
LW8
OHMM
00
000
00 0
11
1
1
4
68
0000000000
A10H
LW8
OHMM
00
000
00 0
11
1
1
4
68
0000000000
A16H
LW8
OHMM
00
000
00 0
11
1
1
4
68
0000000000
A22H
LW8
0194M
00
000
00 0
11
1
1
4
68
0000000000
A28H
LW8
OHMM
00
000
00 0
11
1
1
4
68
0000000000
A34H
---------------------------------------------------------------------------------------
LW8
Ohm
00
000
00 0
11
1
1
4
68
0000000000
** DATA **
DEPT. 12888.000 ROP5.LW8
P10H.LW8 -999.250 P16H.LW8
P34H.LW8 -999.250 A10H.LW8
A28H.LW8 -999.250 A34H.LW8
DEPT. 12624.000 ROP5.LW8
P10H.LW8 -999.250 P16H.LW8
P34H.LW8 -999.250 A10H.LW8
A28H.LW8 -999.250 A34H.LW8
** END OF DATA **
176.470 TABR.LW8
-999.250 P22H.LW8
-999.250 A16H.LW8
-999.250
-999.250 TABR.LW8
-999.250 P22H.LW8
-999.250 A16H.LW8
-999.250
-999.250
GR.LW8
-999.250
-999.250
P28H.LW8
-999.250
-999.250
A22H.LW8
-999.250
-999.250
GR.LW8
54.036
-999.250
P28H.LW8
-999.250
-999.250
A22H.LW8
-999.250
LIS Tape Verificat-i-on Listing 2 -DEC -1997 17:09 PAGE: 33
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME
: EDIT .011
SERVICE
: FLIC
VERSION
001CO1
DATE
97/12/ 2
MAX REC SIZE
1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT):
**** FILE HEADER ****
FILE NAME
: EDIT .012
SERVICE
: FLIC
VERSION
: OOICOI
DATE
: 97/12/ 2
MAX REC SIZE
: 1024
FILE TYPE
: LO
LAST FILE
BOTTOM LOG INTERVAL (FT):
FILE HEADER
FILE NUMBER 12
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 9
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
---------------- ----------- ----------
MWD 12815.0 14061.0
#
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION:
5.OB
DATA TYPE (MEMORY or REAL-TIME) .
MEMORY
TD DRILLER (FT) :
14061.0
TOP LOG INTERVAL (FT) :
8410.5
BOTTOM LOG INTERVAL (FT):
14061.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
45.0
MAXIMUM ANGLE:
61.0
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
---------------- ---------
ARCS RESIST./GR
-----------
ARC5-063
#
LIS Tape Verifica,lon Listing 2 -DEC -1997 17:09 PAGE: 34
Schlumberger Alaska Computing Center
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
REPR CODE
VALUE
BOREHOLE CONDITIONS
66
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G) :
8.80
MUD VISCOSITY (S)
73
MUD PH.
4
MUD CHLORIDES (PPM) :
1
FLUID LOSS (C3) :
66
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
6
MUD AT MEASURED TEMPERATURE (MT):
0.090 155.0
MUD AT MAX CIRCULATIONG TEMPERATURE
65
MUD FILTRATE AT (MT):
0.045 155.0
MUD CAKE AT (MT)
0.5
9
65
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: CDR RUN ON RUNS 1,2
ARC5 RUN ON RUNS 3 - 9
HOLE ANGLE AT TD = 97.8 DEG @ 14061'
CDR RUN IN 8.5" HOLE
ARC5 RUN IN 6" HOLE
WELL IS LATERAL OF 5-43
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, VS.OB SOFTWARE
#
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE -
64EB **
------------------------------
TYPE
REPR CODE
VALUE
------------------------------
1
66
0
2
66
0
3
73
56
4
66
1
5
66
6
73
7
65
8
68
0.5
9
65
FT
LIS Tape Verifica-Lon Listing 2 -DEC -1997 17:09 PAGE: 35
Schlumberger Alaska Computing Center
----------------------------
TYPE REPR CODE VALUE
11 66 18
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
------------------------------
SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 00 000 00 0 12 1 1 4 68 0000000000
ROPS LW9 F/HR 00 000 00 0 12 1 1 4 68 0000000000
TABR LW9 HR 00 000 00 0 12 1 1 4 68 0000000000
GR LW9 GAPI 00 000 00 0 12 1 1 4 68 0000000000
P10H LW9 01M, 00 000 00 0 12 1 1 4 68 0000000000
P16H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000
P22H LW9 OHIKM 00 000 00 0 12 1 1 4 68 0000000000
P28H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000
P34H LW9 OL94M 00 000 00 0 12 1 1 4 68 0000000000
A10H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000
A16H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000
A22H LW9 OHM 00 000 00 0 12 1 1 4 68 0000000000
A28H LW9 ORWT 00 000 00 0 12 1 1 4 68 0000000000
A34H LW9 OHMM 00 000 00 0 12 1 1 4 68 0000000000
---------------------------------------------------------------------------------------
* * DATA * *
DEPT. 14061.000 ROP5.LW9 37.040 TABR.LW9 -999.250 GR.LW9 -999.250
P10H.LW9 -999.250 P16H.LW9 -999.250 P22H.LW9 -999.250 P28H.LW9 -999.250
P34H.LW9 -999.250 A10H.LW9 -999.250 A16H.LW9 -999.250 A22H.LW9 -999.250
A28H.LW9 -999.250 A34H.LW9 -999.250
DEPT. 14000.000 ROP5.LW9 32.970 TABR.LW9 -999.250 GR.LW9 -999.250
P10H.LW9 -999.250 P16H.LW9 -999.250 P22H.LW9 -999.250 P28H.LW9 -999.250
P34H.LW9 -999.250 A10H.LW9 -999.250 A16H.LW9 -999.250 A22H.LW9 -999.250
A28H.LW9 -999.250 A34H.LW9 -999.250
DEPT. 13000.000 ROP5.LW9 50.990 TABR.LW9 2.727 GR.LW9 54.437
P10H.LW9 10.238 P16H.LW9 11.361 P22H.LW9 13.221 P28H.LT99 14.584
P34H.LW9 14.330 A10H.LW9 11.467 A16H.LW9 11.702 A22H.LW9 12.453
A28H.LW9 12.822 A34H.LW9 12.544
DEPT. 12815.000 ROP5.LW9 -999.250 TABR.LW9 -999.250 GR.LW9 64.820
P10H.LW9 -999.250 P16H.LW9 -999.250 P22H.LW9 -999.250 P28H.LW9 -999.250
P34H.LW9 -999.250 A10H.LW9 -999.250 A16H.LW9 -999.250 A22H.LW9 -999.250
A28H.LW9 -999.250 A34H.LW9 -999.250
LIS Tape Verifica,,on Listing 2 -DEC -1997 17:09 PAGE: 36
Schlumberger Alaska Computing Center
** END OF DATA **
**** FILE TRAILER ****
FILE NAME
: EDIT .012
SERVICE
: FLIC
VERSION
: 001col
DATE
: 97/12/ 2
MAX REC SIZE
1024
FILE TYPE
LO
LAST FILE
BOTTOM LOG INTERVAL (FT) :
**** FILE HEADER ****
FILE NAME : EDIT .013
SERVICE : FLIC
VERSION : 001 C01
DATE : 97/12/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE NUMBER 13
RAW MAD
Curves and log header data for each pass of each run in separate files.
MAD RUN NUMBER: 1
MAD PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
MAD 9770.0 9873.0
9
LOG HEADER DATA
DATE LOGGED:
17 -JUN -97
SOFTWARE:
SURFACE SOFTWARE VERSION:
V5 R24
DOWNHOLE SOFTWARE VERSION.
5.OB
DATA TYPE (MEMORY or REAL-TIME):
MEMORY
TD DRILLER (FT):
14061.0
TOP LOG INTERVAL (FT):
8410.5
BOTTOM LOG INTERVAL (FT) :
14061.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
61.0
MAXIMUM ANGLE:
80.0
LIS Tape Verifica —on Listing 2 -DEC -1997 17:09 PAGE: 37
Schlumberger Alaska Computing Center
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
---------------- ---------
ARCS RESIST./GR
-----------
ARC5-063
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
8.500
DRILLERS CASING DEPTH (FT):
3121.0
#
BOREHOLE CONDITIONS
MUD TYPE:
QUICKDRILL
MUD DENSITY (LB/G):
8.80
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHNIM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
0.090 70.0
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT):
0.045 70.0
MUD CAKE AT (MT) :
0.000 0.0
NEUTRON TOOL
MATRIX.
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
20000
REMARKS: CDR RUN ON RUNS 1,2
ARCS RUN ON RUNS 3 - 9
HOLE ANGLE AT TD = 97.8 DEG @ 14061'
CDR RUN IN 8.5" HOLE
ARCS RUN IN 6" HOLE
WELL IS LATERAL OF 5-43
MAD PASS DATA COLLECTED (ARCS ONLY)
9873'-9770'
DATA FROM DOWNHOLE MEMORY, VS.OB SOFTWARE
#
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
------------------------------
TYPE REPR CODE VALUE
------------------------------
1 66 0
2 66 0
LIS Tape Verifica ,on Listing 2 -DEC -1997 17:09 PAGE: 38
Schlumberger Alaska Computing Center
------------------------------
TYPE REPR CODE VALUE
------------------------------
3 73 56
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 18
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
------------------------------
SET TYPE - CHAN **
---------------------------------------------------------------------------------------
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
---------------------------------------------------------------------------------------
DEPT FT 00 000 00 0 13 1 1 4 68 0000000000
ROPS MAI F/HR 00 000 00 0 13 1 1 4 68 0000000000
TABR MAI HR 00 000 00 0 13 1 1 4 68 0000000000
GR MAI GAPI 00 000 00 0 13 1 1 4 68 0000000000
P10H MAI OHWT 00 000 00 0 13 1 1 4 68 0000000000
P16H MAI OlHof 00 000 00 0 13 1 I 4 68 0000000000
P22H MAI OI -24M 00 000 00 0 13 1 1 4 68 0000000000
P28H MAI ORW 00 000 00 0 13 1 1 4 68 0000000000
P34H MAI OIRT4 00 000 00 0 13 1 1 4 68 0000000000
A10H M41 OHDf1 00 000 00 0 13 1 1 4 68 0000000000
A16H MAI OINK 00 000 00 0 13 1 1 4 68 0000000000
A22H MAI OHM%T 00 000 00 0 13 1 I 4 68 0000000000
A28H MAI OHWT 00 000 00 0 13 1 1 4 68 0000000000
A34H MAI OHMM 00 000 00 0 13 1 1 4 68 0000000000
---------------------------------------------------------------------------------------
* * DATA * *
DEPT.
9873.000
ROP5.MA1
153.850
TABR.MAI
P10H.MA_7
-999.250
P16H.MA1
-999.250
P22H.MA1
P34H.MA1
-999.250
A10H.MA1
-999.250
A16H.MA1
A28H.MA1
-999.250
A34H.MA1
-999.250
DEPT.
9770.000
ROPS.MAI
88.680
TABR.MAI
P10H.MA1
5.696
P16H.MA1
6.093
P22H.MA1
P34H.MA1
8.000
A10H.MAI
1.389
A16H.MA1
A28H.MA1
3.896
A34H.MA1
4.777
-999.250
GR.MAI
-999.250
-999.250
P28H.MA1
-999.250
-999.250
A22H.MA1
-999.250
0.258
GR.MA1
105.299
7.230
P28H.MA1
8.223
2.156
A22H.MA1
3.002
LIS Tape Verifica-- on Listing 2 -DEC -1997 17:09 PAGE: 39
Schlumberger Alaska Computing Center
* * ENI? OF DATA * *
**** FILE TRAILER ****
FILE NAME : EDIT .013
SERVICE : FLIC
VERSION : OO1C01
DATE : 97/12/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/12/ 2
ORIGIN : FLIC
TAPE NAME : 97472
CONTINUATION # : 1
PREVIOUS TAPE .
COMMENT : B.P. EXPLORATION, PRUDHOE BAY 5-43 L1, API 450-029-22754-60
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/12/ 2
ORIGIN : FLIC
REEL NAME : 97472
CONTINUATION # :
PREVIOUS REEL .
COP94ENT : B.P. EXPLORATION, PRUDHOE BAY 5-43 L1, API #50-029-22754-60