Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-2167. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU S-213AL2 Change Out Solid Iso Sleeve Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 204-216 50-029-22993-62-00 12100 Conductor Surface Intermediate Production Liner 5069 80 2831 6082 5567 11664 20" 9-5/8" 7-5/8" 4-1/2" 5066 30 - 110 28 - 2859 24 - 6106 6055 - 11665 30 - 110 28 - 2829 24 - 5104 5082 - 5066 6760 520 3090 4790 7500 None 1530 5750 6890 8430 6267 - 11622 4-1/2" 12.6# L-80 22 - 5961 5144 - 5065 Structural 4-1/2" Baker Premier Packer 5844 4977 Torin Roschinger Operations Manager Tyson Shriver Tyson.shriver@hilcorp.com 907-564-4542 PRUDHOE BAY, Polaris Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028253 22 - 5038 N/A N/A 763 880 2612 2711 603 887 1050 1000 600 560 N/A 13b. Pools active after work:Polaris Oil No SSSV Installed 5844, 4977 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 9:48 am, Dec 12, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.12.12 06:54:20 - 09'00' Torin Roschinger (4662) WCB 2-6-2025 DSR-12/16/24 RBDMS JSB 122624 ACTIVITY DATE SUMMARY 12/2/2024 ***WELL S/I ON ARRIVAL*** (Profile modification) RAN 3.50" CENT & 3" SAMPLE BAILER TO ISO SLEEVE AT 6,108' MD (bailer empty - fresh marks on bottom) ***CONTINUE ON 12/3/24 WSR*** 12/3/2024 T/I/O = 989/935/456 LRS 46. Assist Slickline (PROFILE MODIFICATION) Pumped 155 bbls 190* Crude into TBG to assist SL w/ B&F. Pumped 124 bbls Crude at rate to help SL down hole. ***Job Continued to 12-04-2024*** 12/3/2024 ***CONTINUED FROM 12/2/24 WSR*** (Profile modification) RAN 4-1/2" GS TO RESTRICTION AT 5,867' SLM (worked down to 5,879' slm - tools stick) RAN 4-1/2" BRUSH & 3.60" GAUGE RING TO ISO SLEEVE AT 6,098' SLM/ 6,108' MD (LRS pumped 110 bbls hot crude) PULLED ISO SLEEVE AT 6,098' SLM/ 6,108' MD (pkg slightly torn) RAN 4-1/2" BRUSH & 3.60" GAUGE RING TO BRUSH LEMS L3 & L2 RAN ISO SLEEVE TO 6,092' SLM (unable to get deeper) PULLED ISO SLEEVE AT 6,092' SLM RAN 4-1/2" BRUSH & 3.60" GAUGE RING TO 5,974' SLM (unable to work past) RAN 4-1/2" BRUSH, 3.50" CENT & BULLNOSE TO BRUSH LEMS L3 & L2 (LRS pumped 50 bbls crude) SET ISO SLEEVE AT 6,098' SLM/ 6,108' MD ***CONTINUE ON 12/4/24 WSR*** 12/4/2024 ***Job Continued from 12-03-2024*** LRS 46 (PROFILE MODIFICATION) Assist as directed. Slickline in control of well and Pad-Op notified upon LRS departure. 12/4/2024 ***CONTINUED FROM 12/3/24 WSR*** (Profile modification) RAN 4-1/2" GS TO ISO SLEEVE AT 6,098' SLM/ 6,108' MD (jarred down 15 min - no movement) ***WELL LEFT S/I ON DEPARTURE*** Daily Report of Well Operations PBU S-213A ) SET ISO SLEEVE AT 6,098' SLM/ 6,108' MD RAN ISO SLEEVE TO 6,092' SLM (unable to get deeper) () RAN 4-1/2" GS TO ISO SLEEVE AT 6,098' SLM/ 6,108' MD (jarred down 15 min - no movement) () PULLED ISO SLEEVE AT 6,098' SLM/ 6,108' MD P 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU S-213AL2 Set Solid Iso Sleeve Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 204-216 50-029-22993-62-00 12100 Conductor Surface Intermediate Production Liner 5069 80 2831 6082 5567 11664 20" 9-5/8" 7-5/8" 4-1/2" 5066 30 - 110 28 - 2859 24 - 6106 6055 - 11665 30 - 110 28 - 2829 26 - 5104 5082 - 5066 6760 520 3090 4790 7500 None 1530 5750 6890 8430 6267 - 11622 4-1/2" 12.6# L-80 22 - 5961 5144 - 5065 Structural 4-1/2" Baker Premier Packer 5844 4977 Torin Roschinger Operations Manager Tyson Shriver Tyson.shriver@hilcorp.com 907-564-4542 PRUDHOE BAY, Polaris Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028253 22 - 5038 N/A N/A 879 1398 2649 3422 2145 1598 1250 1200 640 498 N/A 13b. Pools active after work:Polaris Oil No SSSV Installed 5844, 4977 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 10:48 am, Nov 19, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.11.19 05:28:39 - 09'00' Torin Roschinger (4662) WCB 2-7-2025 RBDMS JSB 112724 DSR-11/21/24 ACTIVITY DATE SUMMARY 10/18/2024 LRS Well Test Unit #6, Begin WSR on 10/18/24, SLBU, Continue WSR on 10/19/24 10/19/2024 LRS Well Testing Unit #6, Continue WSR from 10/18/24, SLBU, Continue WSR on 10/20/24 10/20/2024 LRS Well Testing Unit #6, Continue WSR from 10/19/24, SLBU, Continue WSR on 10/21/24 10/21/2024 LRS Well Testing #6, Continue WSR from 10/20/24, SLBU, Continue WSR on 10/22/24 10/22/2024 LRS Well Testing Unit #6, Continue WSR from 10/21/24, SLBU, Continue WSR on 10/23/24 10/23/2024 LRS Well Testing Unit #6, Continue WSR from 10/22/24, SLBU, Continue WSR on 10/24/24 **** H2S Drill Performed**** **** Man Down Drill Performed **** **** Well Control Drill Performed**** 10/24/2024 S-100 Freeze Protect outlet well FL with 6 bbls 60/40 LRS testers in control of well upon departure 10/24/2024 LRS Well Test Unit #6, Continue WSR from 10/23/24, Well Test, Flowback, Continue WSR on 10/25/24 10/24/2024 ***WELL FLOWING ON ARRIVAL*** GAUGED 3.78" TO 5982' MD. RAN 3" PUMP BAILER TO BAKER PORTED ISO SLEEVE @ 6108' MD (EMPTY). DRIFTED CLEANLY W/ 10' x 3.50" PUMP BAILER TO PORTED ISO SLEEVE @ 6108' MD. DRIFTED CLEANLY W/ 2.25" CENT, AND 1.75" SAMPLE BAILER TO DEVIATION @ 6380' SLM. ***WSR CONTINUED ON 10-25-24*** 10/25/2024 ***CONTINUED FROM 10-24-24*** PULLED 4 1/2" BAKER PORTED ISO SLEEVE FROM 6108' MD. ***WELL S/I ON DEPARTURE*** 10/25/2024 LRS Well Test Unit #6, Continue WSR from 10/24/24, Well Test, Flowback, Continue WSR on 10/26/24 10/25/2024 ***WELL FLOWING ON ARRIVAL*** R/U SLICKLINE. ***CONTINUED ON 10-26-24*** 10/25/2024 TFS Unit 1 Assist Slickline (Brush and Flush) ***JOB CONTINUES to 10-26-2024*** 10/26/2024 ***CONTINUED FROM 10-25-24*** SET 4 1/2" BAKER TYPE 2 ISO SLEEVE (3.67" OD, 2.57" ID, TYPE 2 KEY, 19' OAL) ACROSS L2 (OBa) @ 6,108' MD TAGGED TOP OF ISO SLEEVE @ 6,108' MD & JARRED DOWN TO CONFIRM SET ***WELL HANDED BACK TO TESTERS*** 10/26/2024 T/I/O= 825/1050/500 TFS Unit 1 Assist Slickline (Brush and Flush) Pumped 150 BBLS of Crude to Assist Slickline down hole. Slickline in control of well upon Departure. FWHP=0/1050/500 10/26/2024 LRS Well Test Unit #6, Continue WSR from 10/25/24, Well Test, Flowback, Continue WSR on 10/27/24 10/27/2024 LRS Well Test Unit #6, Continue WSR from 10/26/24, Well Test, Flowback, Continue WSR on 10/28/24 Daily Report of Well Operations PBU S-213A SET 4 1/2" BAKER TYPE 2 ISO SLEEVE (3.67" OD, 2.57" ID, TYPE 2 KEY, 19' OAL) ACROSS L2 (OBa) @ 6,108' MD Daily Report of Well Operations PBU S-213A 10/28/2024 LRS Well Test Unit #6, Continue WSR from 10/27/24, Well Test, Flowback, Continue WSR on 10/29/24 10/29/2024 LRS Well Test Unit #6, Continue WSR from 10/28/24, Well Test, Flowback, Divert Into WPS, Continue WSR on 10/30/24 10/30/2024 LRS Well Test Unit #6, Continue WSR from 10/29/24, Well Test, Flowback, 12 Hr PBWT, RDMO, ,END WSR on 10/30/24 JOB COMPLETE · . Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c2 Q IJ - Q 10 Well History File Identifier Organizing (done) o Two-sided 111111111111111111I o Rescan Needed III 11111111 II 11111I RESCAN DIGITAL DATA ¢'Diskettes, No. , o Other, NolType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Color Items: o Greyscale Items: o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Date L/- J¡ :J-/O 7 Date LfjlJ-/fJ 7 :3 X30=QO Date Lf- /1 f}- / !J1 o Other:: {YIP ,:111111111I1111111 m P BY: ~ /5/ Project Proofing BY: ~ Scanning Preparation BY: ~ + (P = TOTAL PAGES q to (Count does not include cover sheet) VVl.. P /5/ ProducffonScanning 1111111111111111111 Stage 1 Page Count from Scanned File: q 7 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: VYES BY: ~ Date: 4/ /8-/07 /5/ NO mP Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /5/ 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: /5/ Comments about this file: Quality Checked 111111111111 111111I 10/6/2005 Well History File Cover Page.doc • • -- - . ~ ~~ 03~0~12oos DO NOT PLACE ~:. ~.~:r~ ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\C~+rPgs_Inserts\Milcmfilm RRarker.~c )~ DATA SUBMITTAL COMPLIANCE REPORT 3/12/2007 Permit to Drill 2042160 Well Name/No. PRUDHOE BAY UN POL S-213AL2 Operator BP EXPLORATION (ALASKA) INC MD 12100~' TVD 5069'/ Completion Date 2/3/2005../ Completion Status 1-01L Current Status 1-01L ---------, ~_...''''''--'--------'------'-''--- --.. ----------~~-"._- -------~--~-----.--- -------~ ~-- ~--------------- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes ----------------- ___on, ,,- - --- ------~---_... ~-_._----------~--- --- --.- -----------..---.-- --------------------. DATA INFORMATION Types Electric or Other Logs Run: MWD 1 GR I RES 1 Azimuthal Den 1 NEU 1 AIM 1 PWD Well Log Information: .5> h)",6 '-t J",Aùð y- API No. 50-029-22993-62-00 UIC N ---------- ---------- ._----------~----- (data taken from Logs Portion of Master Well Data Maint Logl Electr Data Digital Dataset !i&e Med/Frmt Number Name ._- < D D Asc Directional Survey ~t Directional Survey ~g 14323 I nd u ction/Resistivity ¡jOg. 14323 I nduction/Resistivity ~ C Lis 14323 I nd u ction/Resistivity I. Well Cores/Samples Information: Name Log Log Run Scale Media No Interval OHI Start Stop CH Received 0 12100 4/1/2005 0 12100 4/1/2005 2856 12100 Open 1/10/2007 2856 12100 Open 1/10/2007 2856 12100 Open 1/10/2007 ---~---------- --------- Sample Set Number Comments 25 Blu ~rBlu .-- ~._------------~-- Interval Start Stop Sent Received ADDITIONAL INFORMATION Well Cored? yX]) Chips Received? Ynï Daily History Received? 'Q)N (Y)I N Formation Tops Analysis Received? 'f-Ho - ----._-- .- -. - -----------------,--- -- -~-------.._- --,-~-------~----- Comments: Compliance Reviewed By: ~ ...--- Date: ~~-i¥--cX ð ~¿----- II Comments ------------- . MD Vision Service FINAL 8-Jan-2005 TVD Vision Service FINAL 8-Jan-2005 LIS Veri w/Graphics - -- - ~-------- Schlumberger Sch'umberger~DCS 2525 Gambell St. Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well L-212 S·213AL1 S-213AL1-01 S-213AL2 S-213AL3 :;)D'--/- ~/ Co tf 1'13;;)3 Job # Log Description 11039112 CH EDIT USIT (PDC·GR) 40011201 OH EDIT MWD/LWD 40011201 OH EDIT MWD/LWD 40011201 OH EDIT MWD/LWD 40011201 OH EDIT MWD/LWD PLEASE ACKNOWLEOGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Explorahon (Alaska) Inc Petrotechnical Data Center LR2-1 900 E Benson Blvd Anchorage AK 99508·4254 Date Delivered 04/18105 12/20104 12/25/04 01108/05 01127/05 01108107 NO. 4105 Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Orion Date Color BL CD 2 2 2 2 . Schlumberger-DCS 2525 Gambell St. Suite 400 Anchorage, AK 99503~2838 A TTN Beth Received by . . . Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman Well No S-213AL2 Date Dispatched: 10-Mar-05 Installation/Rig Doyon 16 Dispatched By: 0 Data No Of Prints No of Floppies Surveys 2 Received By: 1~~ ælLJ Please sign and return to: Drilling & Measurements LWD Division 3940 Arctic Blvd, Suite 300 Anchorage, Alaska 99503 nrose1@slb.com Fax: 907 -561-8417 LWD Log Delivery V1.1, 10-02-03 Schlumberger Private ÄOL(~~(G . STATE OF ALASKA . ALASK L AND GAS CONSERVATION COMI . ION WELL COMPLETION OR RECOMPLETION REPORT AND LptE CE IVED MAR 1 0 7005; 1b. Well Class: AIIS~süt~_ o StraWH~Ric D,§ë'r\}l~ê' .. 12. Permit tõ'ð~M~umber 204-216 13. API Number 50- 029-22993-62-00 14. Well Name and Number: PBU S-213AL2 15. Field I Pool(s): Prudhoe Bay Field / Polaris Pool No. of Completions 1a. Well Status: IS! Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD / GR I RES I Azimuthal Den I NEU / AIM / PWD CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE lOP BoTTOM Top BOTTOM SIZE Surface 110' Surface 110' 30" 28' 2859' 28' 2829' 12-1/4" 24' 6108' 24' 5104' 8-3/4" 6055' 11665' 5082' 5066' 6-3/4" o GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: . 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM Top of Productive Horizon: 2848' NSL, 1369' WEL, SEC. 34, T12N, R12E, UM (OBb) Total Depth: 2605' SNL, 1291' WEL, SEC. 03, T11 N, R12E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 618930 y- 5980550 Zone- _AS~~__. TPI: x- 616807 y- 5979018 Zone- ASP4 Total Depth: x- 616979 y- 5973568 Zone- ASP4 -------------------~--- ._~------------------- 18. Directional Survey IS! Yes 0 No 22. CASING SIZE WT. PER FT. 94# 40# 29.7# 12.6# GRADE L-80 L-80 L-80 L-80 20" 9-5/8" 7-5/8" 4-1/2" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6267' - 11622' 5144' - 5065' One Other 5. Date Comp., Susp., or Aband. 2/3/2005 6. Date Spudded 114/2005 7. Date T.D. Reached 1/8/2005 8. KB Elevation (ft): 61.82' 9. Plug Back Depth (MD+ TVD) 12100 + 5069 10. Total Depth (MD+ TVD) 12100 + 5069 11. Depth where SSSV set (Nipple) 2255' MD 19. Water depth, if offshore N/ A MSL 24. SIZE 4-1/2", 12.6#, L-80 Ft Ft 16. Property Designation: ADL 028253 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) CEMENTING AËCORD 260 sx Arctic Set (Approx.) 440 sx AS Lite III, 215 sx Class 'G' 229 sx Class 'G' Uncemented Slotted Liner AMOUNT PULLED TUBING RECORO DEPTH SET (MD) 5961' PACKER SET (MD) 5844' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Flowing OIL-BBL GAs-McF WATER-BBL DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect wi 100 Bbls of Diesel GAs-McF WATER-BBL 26. Date First Production: March 8, 2005 Date of Test Hours Tested PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". OIL -BBL None .~þ~- . ~v~p~.¡:;'Fr ;. "~, OR'\Giì\ i\L ¡ \ \\1 /-\ c. Form 1 0-407 Revised 12/2003 CONTINUED ON REVERSE SIDE CHOKE SIZE I GAS-OIL RATIO OIL GRAVITy-API (CORR) RBDMS BFl MAR 1 4 Z005 CJ 28. GEOLOGIC MARKER. 29. .RMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OBb 6239' 5140' None Schrader Bluff eBb 6519' 5139' Schrader Bluff eBb 7011' 5103' Schrader Bluff eBb 7099' 5093' 30. List of Attachments: Summary of Daily Drilling Reports. Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~.J~ Title Technical Assistant Date œ -{ D"'05 PBU S-213AL2 204-216 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Michael Triolo, 564-5774 Permit No. I Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 1 0-407 Revised 12/2003 Submit Original Only S-213A MDT Client BP Exploration Inc Tool pa/psllf/sc/ ':Jo/sc/po/sc/sc/ms/pc Well S-213A Spec D,weather Date 11/29/04 SO File Time Depth Zone Tool TVD Temp Pretest Mob Before Formation After Flow presÚre PurllpV pumptirTle TestTvpe/cômment 5 12:14 5176 ps 90 20 2296 2158 2295 tool check 7 correlation 15 8 correlation 19 14:30 5531 Mb1 ps 94 20 2.4 2340 2293 2339 ¡¡ood test 21 15:00 5630 Mb2 ps 94 20 2387 lost seal could not hold set persure 22 15:20 5631 Mb2 ps 94 20 2383 lost seal could not hold set persure 24 15:30 5728 Mc ps 95 20 4.1 2425 2198 2411 ¡¡ood test 25 1600 5744 Mc ps 95 20 2425 lost seal could not hold set persure 26 16:15 5745 Mc ps 96 20 2418 2414 lost seal 27 16:29 5747 Mc ps 96 20 108.2 2427 2200 2416 ¡¡ood test 28 16:50 5748 Nb ps 96 20 2449 los seal 29 17:03 5849 Nb ps 96 20 17.1 2446 2114 2443 ¡¡ood test 30 17:30 6000 Oa ps 97 20 38.9 2492 2081 2483 ¡¡ood test 31 17:40 6031 Oa ps 97 20 2500 2491 lost seal 32 17:50 6032 Oa ps 97 20 2493 lost seal . 33 18:00 6060 Oa ps 98 20 8.2 2505 2110 2494 ¡¡ood test 34 18:20 6117 Oba ps 98 20 2509 lost seal 35 18:40 6118 Oba ps 98 20 2511 2507 lost seal could not hold set persure 36 19:00 6214 Obb ps 99 20 2535 2524 lost seal 37 19:22 6215 Obb ps 99 20 2527 2523 lost seal 38 19:37 6235 OBb ps 100 20 30.9 2539 2062 2524 ¡¡ood test 39 19:55 6247 OBb ps 100 20 8.8 2542 2067 2525 ¡¡ood test 40 21:00 6402 Obc ps 100 20 2565 2554 dry test 41 21:00 6403 Obc ps 100 20 2556 2549 lost seal 42 21:27 6424 Obc ps 101 20 2567 2551 lost seal 43 21:40 6525 Obc ps 101 20 2556 2550 lost seal 45 2145 6491 Obc ps 102 20 2565 2559 lost seal 46 21:56 6492 Obc ps 102 20 2565 2556 dry test 47 22:05 6496 Obc ps 102 20 2569 2555 dry test 48 22:12 6497 Obc ps 102 20 2563 2556 lost seal 49 22;24 6498 Obc ps 102 20 2563 2555 dry test 50 23:21 6824 Obd ps 103 20 2600 2581 lost seal 51 23:32 6825 Obd ps 103 20 2593 2582 lost seal 52 23:47 6820 Obd ps 103 20 245 2577 2083 2577 good test 54 ..:30 6824 Obd pa 102 .. 2582 2579 54990 63 MRSC-243 PUrTlPÚplo 4000 psi 111al. Oil $ample 56 3:46 6117 66690 I 70 MRSC-292 pump uP to. 4000 psi .·1 ¡¡at oil sample ,I· 86 .··..MPSW1391··: ",,~,,:: , ': " '; "',,., ".,' v: ' ',;, . pomp Up to 4000 psl~' 450 00 ¡¡assarnple 59 8:13 6496 000 pa 99 2555 2559 70010 120 15795 60 could nofflow 60 9:54 6491 Obc pa 101 2568 2558 700 to 50 30 could not flow 61 11:20 6424 000 pa 101 2581 2556 700 to 50 27 couldnol flow 62 ..i, ·...·..60 MPSRI398 puinp op to 4000 psi .... 450 ccoilsilmple 65 '/. /..1,.·...·.60 MPRS~1399. pump up 104000 psi 450ceoll Sample 66 $1>895 I 90 450 cêollsamplE! pump up-tó 4()()() psi MPSR·1400 90675 '. j 80 MP$R,1401 pump ÚP to 4000 psi 450 cê oil Sample Mbl pa 2341 2179 2343 1900 I 75 MPSR-1402 pump.Up to 4000 psi 450.00 oil and water s. S-213A MDT Fluid Properties Sample ID Cylinder # Depth Sand GOR Molar Mass Density API (ft) sef/stb (glee) 1.01 CSB 7759-QA 6,824 OBd 310 268.3 0.91 24.1 1.02 CSB 7763-QA 6,824 OBd 307 269.1 0.91 24 1.04 CSB 7476-MA 6,177 OBa 234 332.5 0.941 18.8 1.05 CSB 7735-QA 6,177 OBa 225 333.2 0.942 18.8 gas and water/filtrate . 1.07 CSB 7753-QA 6,000 OA-Upper 15,670 175 0.836 37.7 only - no oil 1.08 CSB 7755-QA 6,403 OBe 291 263 0.907 24.5 1.09 CSB 7690-QA 6,247 OBb 260 282.7 0.917 22.8 1.10 CSB 7761-QA 6,059 OA-Lower 212 308.9 0.936 19.7 1.11 CSB 7725-QA 5,747 Me 194 457.9 0.972 14 1.12 CSB 7680-QA 5,531 Mb1 203 480.4 0.98 12.9 . Legal Name: 8-213 Common Name: 8-213 1/3/2001 11125/2004 12/812004 FIT LOT FIT 2,858.0 (ft) 2,856.0 (ft) 6,870.0 (ft) 2,838.0 (ft) 2,828.0 (ft) 5,265.0 (ft) 10.50 (ppg) 9.20 (ppg) 9.00 (ppg) . . 300 (psi) 820 (psi) 411 (psi) 1,848 (psi) 2,172 (psi) 2,873 (psi) 12.53 (ppg) 14.78 (ppg) 10.50 (ppg) Printed: 2/7/2005 9:37:38 AM S-213A MDT Client BP Exploration Inc Tool palps/lf/sclpo/sclpo/sclsclms/pc Well S-213A Spec D,weather Date 11/29/04 SO Rle Time Depth Zone Tool TVD Temp Pretest Mob Before Formation After Flow presure Pump V pump time Test Type/comment 5 12:14 5176 ps 90 20 2296 2158 2295 tool check 7 correlation 15 8 correlation 19 14:30 5531 Mb1 ps 94 20 2.4 2340 2293 2339 ç ood test 21 15:00 5630 Mb2 ps 94 20 2387 lost seal could not hold set persure 22 15:20 5631 Mb2 ps 94 20 2383 lost seal could not hold set persure 24 15:30 5728 Mc ps 95 20 4.1 2425 2198 2411 ç ood test 25 1600 5744 Mc ps 95 20 2425 lost seal could not hold set persure 26 16:15 5745 Mc ps 96 20 2418 2414 lost seal 27 16:29 5747 Mc ps 96 20 108.2 2427 2200 2416 ç ood test 28 16:50 5748 Nb ps 96 20 2449 los seal 29 17:03 5849 Nb ps 96 20 17.1 2446 2114 2443 good test 30 17:30 6000 Oa ps 97 20 38.9 2492 2081 2483 good test 31 17:40 6031 Oa ps 97 20 2500 2491 lost seal 32 17:50 6032 Oa ps 97 20 2493 lost seal 33 18:00 6060 Oa ps 98 20 8.2 2505 2110 2494 ç ood test . 34 18:20 6117 Oba ps 98 20 2509 lost seal 35 18:40 6118 Oba ps 98 20 2511 2507 lost seal could not hold set persure 36 19:00 6214 Obb ps 99 20 2535 2524 lost seal 37 19:22 6215 Obb ps 99 20 2527 2523 lost seal 38 19:37 6235 OBb ps 100 20 30.9 2539 2062 2524 ç ood test 39 19:55 6247 OBb ps 100 20 8.8 2542 2067 2525 good test 40 21:00 6402 Obc ps 100 20 2565 2554 dry test 41 21:00 6403 Obc ps 100 20 2556 2549 lost seal 42 21:27 6424 Obc ps 101 20 2567 2551 lost seal 43 21:40 6525 Obc ps 101 20 2556 2550 lost seal 45 2145 6491 Obc ps 102 20 2565 2559 lost seal 46 21:56 6492 Obc ps 102 20 2565 2556 dry test 47 22:05 6496 Obc ps 102 20 2569 2555 dry test 48 22:12 6497 Obc ps 102 20 2563 2556 lost seal 49 22:24 6498 Obc ps 102 20 2563 2555 dry test 50 23:21 6824 Obd ps 103 20 2600 2581 lost seal 51 23:32 6825 Obd ps 103 20 2593 2582 lost seal 52 23:47 6820 Obd ps 103 20 245 2577 2083 2577 good test 54 :30 6824 Obd pa 102 2582 2579 2068 54990 63 MRSÇ-243 P\.mP lIP to 4000 psi 1 gal. Oil Samp Q 'é6690 ¡ 10 j)UIIIP III> to 4000 psi 99 2479 lots of Gas I 86 MP8R-I397 P\.mP ÌIP to 4000 psi . 450 cc gas samøte 59 8:13 6496 Obc pa 99 2555 2559 100 to 120 15795 60 . could not Bow . 60 9:54 6491 Obc pa 101 2568 2558 100 to 50 30 cot.dd not flow 61 11:20 6424 Obc pa 101 2581 2558 100 to 50 21 could not ftow 62 6403. pa 101. 1500 to 1900. 60 P\.mP lIP to 4000 psi I MPRS-1399 PImP ùø 10 4000 psi 450 cc 011 samøte 50895 90 )ump lIP to 4000 psi .' 18:23 9OJ15 ¡ 60 P\.mP up to 4000 psi 68 20:22 .2343 15 MPSR·I402 )ump up to 4000 ø$i . 450 cc 011 and water s. S-213A MDT Fluid Properties Sample ID Cylinder # Depth Sand GOR Molar Mass Density API (ft) sef/stb (g/ee) 1.01 CSB 7759-QA 6,824 OBd 310 268.3 0.91 24.1 1.02 CSB 7763-QA 6,824 OBd 307 269.1 0.91 24 1.04 CSB 7476-MA 6,177 OBa 234 332.5 0.941 18.8 1.05 CSB 7735-QA 6,177 OBa 225 333.2 0.942 18.8 gas and water/filtrate 1.07 CSB 7753-QA 6,000 OA-Upper 15,670 175 0.836 37.7 only - no oil . 1.08 CSB 7755-QA 6,403 OBe 291 263 0.907 24.5 1.09 CSB 7690-QA 6,247 OBb 260 282.7 0.917 22.8 1.10 CSB 7761-QA 6,059 OA-Lower 212 308.9 0.936 19.7 1.11 CSB 7725-QA 5,747 Me 194 457.9 0.972 14 1.12 CSB 7680-QA 5,531 Mb1 203 480.4 0.98 12.9 . ,848 (psi) 2.53 (ppg) 2,172 (psi) 4.78 (ppg) 2,873 (psi) 0.50 (ppg) . . Printed: 2/7/2005 9:37:38 AM 300 (psi 820 (psi 411 (psi 0.50 (ppg) 9.20 (ppg) 9.00 (ppg) 2,838.0 (ft 2,828.0 (ft) 5,265.0 (ft) 2,858.0 (ft 2,856.0 (fl 6,870.0 (ft) Legal Name 5-213 Common Name: 5-213 1/3/2001 FIT 11125/2004 LOT 2/8/2004 FIT . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 07:30 - 15:00 I 7.50 MOB P I I 115:00 - 00:00 9.00 MOB P 11/18/2004 00:00 - 00:00 24.00 MOB P 11/19/2004 00:00 - 04:30 4.50 MOB P 04:30 - 12:00 7.50 MOB P I I 112:00 - 13:00 . 1.00 WHSUR P 13:00 - 15:30 2.50 KILL P 15:30 - 16:30 1.00 WHSUR I P 16:30 - 17:00 0.50 WHSUR P 17:00 - 20:00 3.00 KILL P Move rig off from J-02b. Pre-move safety meeting with Tool Service, Security and all rig personnel reviewing pre-move route inspection and all rig move hazards. Move rig from J-Pad to S-Pad. Security stopped rig move for 2 hrs to clear the road allowing personnel to respond to Z-Pad. . PRE Work on cellar door and flowline mods PRE Continue rig mods, cellar doors and flow line. Install vacuum system lines and controls. PRE RD flowline platform and scud launcher. PRE Spot rig over S-213. Spot and RU pit, pump and generator modules. 20:00 - 21 :00 I 1.00 KILL P I 21 :00 - 00:00 . 3.00 WHSUR P 11/20/2004 00:00 - 01 :00 1.00 WHSUR P 01 :00 - 08:00 7.00 BOPSUP P 08:00 - 08:30 0.50 BOPSUP P 08:30 - 09:00 0.50 BOPSUF P 09:00 - 12:00 3.00 BOPSUP P 12:00 - 12:30 0.50 BOPSUF P 12:30 - 13:30 1.00 WHSUR P 13:30 - 14:30 1.00 PULL P 14:30 - 15:00 0.50 PULL P 15:00 - 16:30 1.50 PULL P 16:30 - 17:00 0.50 PULL P RIG ACCEPTED @ 12:00 HRS DECOMP I RU to tree to circulate. DECOMP Take on seawater. RU scaffolding in cellar. Berm rig. DECOMP PJSM. RU DSM and pull BPV through lubricator. RD DSM. DECOMP Hold pre-spud meeting with crew and all service personnel. Review well hazards and SOR. DECOMP RU lines and pressure test to 2900 psi. Reverse circulate 20 bbls through choke using cellar manifold to remove freeze protect diesel from the tbg. Started taking mixed diesel and crude oil returns to cuttings box. Switched manifold and circulated a 40 bbl detergent sweep surface to surface holding 100-150 psi choke pressure to circulate diesel out of annulus. Circulate a second 40 bbl detergent sweep around to clean up tbg and csg. DECOMP Shut in choke and kill lines, monitoring pressure. RD and blow down lines. 0 pressure, open choke and flow check well for 15 minutes. DECOMP PJSM. ND tree and adapter flange. Break out tree and set behind well. DECOMP Break out adapter flange and set out of cellar behind well. Enclose rig cellar with tarps. DECOMP NU BOPE. Install HCR valves. Hook up choke & kill lines to HCR valves. NU riser & flow line. RU floor drain lines to flowline manifold. DECOMP PJSM with all rig personnel on testing BOPE. DECOMP RU BOP test equipment DECOMP Test BOPE to 250 13500 psi. Unable to test lower pipe rams with tbg hanger in the hole. Witness of test waived by John Crisp with AOGCC. DECOMP RD BOP test equipment. Blow down lines. DECOMP PJSM. RU DSM and pull TWC through lubricator. RD DSM DECOMP RU tbg equipment to pull 3-1/2" completion. DECOMP MU DP with XO to 4-1/2" NSCT tbg hanger. BOLDS. PU 78k and unseat tbg hanger. Up weight wI tbg 77k. Pull hanger to floor. DECOMP Break out and LD tbg hanger. MU to tbg and circulate 40 bbl detergent sweep around while reciprocating tbg DECOMP PJSM with rig crew on pulling and laying down tbg, Printed: 2/7/2005 9:37:45 AM · Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11120/2004 ,17:00 - 23:30 I 6.50 PULL P DECOMP Pull and LD 3-1/2" completion. Losses averaging 6-7 bph while pulling tbg. , Recovered: 1- jt 4-1/2" tbg 161 - jts 3-1/2" tbg ,3 - GLM's ! 1 - "X" Nipple 11 - 18.71' cut joint of 3-1/2" tbg 23:30 - 00:00 0.50 BOPSUP P DECOMP Monitor well. RU test equipment. Set test plug and fill stack. 11/21/2004 00:00 - 01 :00 1.00 BOPSUF P DECOMP Test lower pipe rams 250/3500 psi. RD test equipment. 01 :00 - 02:00 1.00 PULL P DECOMP Clear tbg handling equipment from rig floor. Clean rig. 02:00 - 03:00 1.00 CLEAN P DECOMP Install wear bushing. PU BHA #1, 6-1/8" clean-out assembly. 03:00 - 08:30 5.50 CLEAN P DECOMP RIH to 5241' with clean out assy picking up 4" DP from pipe shed. Fill DP and break circulation every 25 stands. 08:30 - 09:00 0.50 CLEAN P DECOMP Wash down from 5241' to tbg stub at 5265'. 5 bpm @ 550 psi 109:00 - 10:00 1.00 CLEAN P DECOMP Circulate 20 bbl detergent sweep followed 40 bbl h-vis sweep. I Continue circulating to get sweeps out of the hole and clean returns. Losses averaging 6 bph. 5 bpm @ 550 psi 10:00 - 13:00 3.00 CLEAN P DECOMP Monitor well - level dropping. POH with clean-out assy I P /U 107k Ibs SIO 1 05k Ibs 113:00 - 13:30 0.50 CLEAN P DECOMP LD 6-1/8" clean out BHA. 13:30 - 14:00 0.50 CLEAN P DECOMP Service rig, drawworks, crown, blocks and iron roughneck 14:00 - 15:00 1.00 DHB P DECOMP MU HES 7" EZSV bridge plug assembly. 15:00 - 17:30 2.50 DHB P DECOMP RIH to 5220' 17:30 - 18:00 0.50 DHB P DECOMP Break circulation. POH to 5200 and set EZSV. 18:00 - 18:30 0.50 DHB P DECOMP Pressure test EZSV to 1000 psi. 18:30 - 20:30 2.00 PXA N CEMT DECOMP Circulate while waiting for cement to be re-batched and sent to location. Testing of original cement showed a two hour set time, was sent back to the plant to be re-blended with a minimum 3 hr set time. ·20:30 - 21 :00 0.50 PXA P DECOMP PJSM with Schlumberger, MI, Veco and all rig personnel on mixing and pumping cement. 21 :00 - 21 :15 0.25 PXA P DECOMP Pump 5 bbls water to fill lines. pressure test cement lines to 3500 psi. 21 :15 - 21 :30 0.25 PXA jP DECOMP Batch mix and pump 11 bbls (66 sxs) 15.7 ppg, Arctic Set I I cement. Chase with 10 bbls of water behind cement to flush lines. ·21 :30 - 22:00 0.50 PXA P DECOMP Switch to rig pump and displace cement with 49 bbls seawater. 22:00 - 22:30 0.50 PXA P DECOMP POH with 5 stands to 4700' 22:30 - 23:15 0.75 PXA P DECOMP Circulate clean seawater around to ensure DP is free of cement. 5 bpm @ 300 psi 23:15 - 00:00 0.75 PXA P DECOMP Displace well to 9.5 ppg used LSND mud. 5 bpm @ 490 psi 11/22/2004 00:00 - 02:00 2.00 PXA P DECOMP Pump dry job, blow down top drive. POH with setting tool Printed: 2n/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 11122/2004 02:00 - 04:00 2.00 PXA P DECOMP MU EZSV #2 and RIH to 3155' 04:00 - 04:30 0.50 PXA P DECOMP I PU to 3150' and set EZSV. P/U 84k Ibs SIO 80k Ibs 04:30 - 06:00 1.50 PXA P DECOMP Blow down top drive and POH with setting tool. 06:00 - 07:00 1.00 STCTPL P DECOMP Pull wear bushing and rig up double valve on 9-5/8" X 7" annulus. 07:00 - 09:00 2.00 STCTPL P DECOMP MU BOT csg cutter assembly and RIH to 2950' 09:00 - 10:00 1.00 STCTPL P DECOMP Position cutters @ 2950'. Cut 7" csg. 10:00-11:00 1.00 STCTPL P DECOMP Establish circulation through 9-5/8" X 7" annulus. Circulate -50 bbls dead crude out of well. 11 :00 - 13:30 2.50 STCTPL P DECOMP Displace annulus to hot seawater followed by 100 bbl detergent sweep. Then displace annulus to 9.4 ppg LSND mud 13:30 - 14:00 I , 4 bpm @ 950 psi 0.50 I STCTPL P DECOMP Pull 1 stand, MU spear assembly and spear 7" csg. BOLDS 14:00 - 15:00 i 1.00 STCTPL P DECOMP Pull of to 350k Ibs, establish circulation and work casing pulling up to 375k Ibs. Able to pull csg 3' up hole. 15:00 - 16:30 1.50 STCTPL P DECOMP Attemp to work casing back down. Able to work hanger down to 0.50 i STCTPL P 1.5' above ring. 16:30 - 17:00 DECOMP Release spear. LD spear assy. 17:00 - 19:00 2.00 I STCTPL P DECOMP POH and LD csg cutter assembly. 119:00 - 21 :30 2.50! STCTPL P DECOMP PU spear assy and spear 7" csg. Establish circulation, 4 bpm I @ 450 psi. Work casing picking up to 375k Ibs. Work csg 5' uphole. Packing off, no returns. Continue working csg picking up to 400k Ibs and attempting to regain circulation. NO progress. Un spear and LD spear assy. 21 :30 - 23:00 1.50 STCTPL P DECOMP PU csg cutter and RIH to 2915'. 23:00 - 00:00 1.00 STCTPL P DECOMP Rig service, inspect top drive. 11/23/2004 00:00 - 00:30 0.50 STCTPL P , DECOMP Pump cutter knives open, RIH and tag csg collar at 2913'. PU l' to 2912' and cut csg. Cut at 2912',53' below 9-5/8" csg shoe. 00:30 - 02:00 1 .50 PXA P DECOMP Pump dry job, blow down top drive. POH with csg cutter assy. 02:00 - 02:30 0.50 STCTPL' P DECOMP PU csg spear and change out grapple. RIH and spear 7" csg. 02:30 - 03:00 0.50 STCTPL P DECOMP PU to 375k, attempt to establish circulation, packed off. Continue working csg, attempting to circulate. Csg finally came free at 395k Ibs. Establish circulation, 3 bpm @ 300 psi. 03:00 - 03:30 0.50 STCTPL P DECOMP CBU 4 bpm @ 300 psi. 03:30 - 04:00 0.50 STCTPL P DECOMP Pull csg hanger to the rig floor. Rig up csg equipment while circulating, 4 bpm @ 300 psi. 04:00 - 04:30 0.50 STCTPL P DECOMP break out and LD csg spear. Blow down top drive. CO elevators. 04:30 - 05:00 0.50 STCTPL P DECOMP PJSM with all rig personnel on breaking out and laying down csg. 05:00 - 10:30 5.50 STCTPL' P DECOMP Pull and UD 69 jts of 7" csg, 29' of cut off jt, casing pup below hanger 10:30 - 11 :30 1.00 STCTPL P DECOMP UD casing equipment, P/U spear, make service breaks, UD spear 11 :30 - 13:00 1.50 CLEAN P DECOMP Clear and clean floor. 13:00 - 14:00 1.00 CLEAN P DECOMP Service rig and topdrive, lubricate and inspect crown. 14:00 - 15:30 1.50 CLEAN P DECOMP Change out saver sub on topdrive. 15:30 - 17:00 1.50 WHSUR P DECOMP Install double valve, flange and gauge on OA annulus. 17:00 - 20:00 3.00 REMCM-P DECOMP P/U 30 jts of 3.5" tubing, RIH with 4" DP, tag EZSV at 3,150', Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 pull up to 3,143' UD joint of DP. M/U TIW valve and cement hose, CBU 5 bpm @ 300 psi, up wt = 75k, dn wt = 75k, held PJSM with all rig personnel andcementers, while circulating, 20:30 - 21 :00 0.50 REMCM-P DECOMP Pump 5 bbls water and test lines to 2,500 psi, pump remaining 13 bbls at 5 bpm @ 360 psi, pump 65 bbls 17 ppg class G ¡ cement, 5 bpm 320 psi, pump 2.5 bbls water behind, and I displace cement with rig pumps at 5 bpm 250 psi, pumped calculated strokes to balance plug, 15 bbls, 176 strokes. CI P 0.50 I REMCM+P @ 21 :00 hrs. 21 :00 - 21 :30 DECOMP POH slowly to 2,174' 21 :30 - 22:30 1.001 REMCM.P DECOMP M/U topdrive, break circulation @ 1 bpm, increased rate to 6.5 i I bpm 270 psi circulate hole clean, no cement to surface. 22:30 - 23:30 1.00 I REMCM-P DECOMP Pump dry job, POH to 955' 23:30 - 00:00 0.50 REMCM-P DECOMP R/U and lay down 3.5" tubing. 11/24/2004 00:00 - 01 :00 1.00 i REMCM-P DECOMP Continue laying down 30 joints 3.5" tubing 01 :00 - 02:00 1.00 i REMCM-P DECOMP Rig down tubing handling equipment, Install wear ring, Clean i floor I 02:00 - 05:00 3.00' REMCM-P DECOMP Pickup 3 DCs, 14 joints 4" HW, Jars, and 39 jts 4" DP. 05:00 - 06:00 1.00 REMCMfP , DECOMP POH stand back 13 stands DP 5 stands HW. 06:00 - 06:30 , 0.50 REMCM P DECOMP Make up 8 3/4" milltooth bit, clean floor 106:30 - 07:30 1.00, REMCM P DECOMP RIH with clean out assembly to 1,990' 07:30 - 09:30 2.00 REMCM-P DECOMP Circulate @ 1,990' 2 bpm, 130 psi, while wait on cement. 109:30 - 12:00 2.50 REMCM-P DECOMP Wash from 1,990' tag top of cement at 2,203', Drill cement from 2,203' to 2,285', 10-25k wob, 410 gpm, 670 psi, 80 rpm, torque 3-4k, 40-60 fph. 12:00 - 21 :30 9.50 I REMCM-P DECOMP Continue drilling cement from 2,285' to 2750' 20-28k wob, 415 gpm, 700 psi, 80 rpm, torque 4-5k, 40-60 fph. up wt = 95k, dn wt = 85k, rt wt = 90k 21 :30 - 22:00 0.50 REMCM-P DECOMP Circulate bottoms up, 415 gpm @ 700 psi. 22:00 - 23:00 1.00 REMCM-P DECOMP POH with clean out assmbly 23:00 - 00:00 1.00 REMCM-P DECOMP Break bit, stand back DCs. 11/25/2004 00:00 - 03:30 3.50 CLEAN P DECOMP Make up 8 3/4" drilling assembly, orient MWD and motor, PJSM handling sources, load sources and pickup remaining BHA, surface test MWD at 640', flow rate 460 gpm @ 875 psi. 03:30 - 04:30 1.00 CLEAN P DECOMP RIH with 8 3/4" drilling assembly, position Ghost reamers @ +1- 1,000 and +1- 2,000' per directioal driller, continue RIH to 2694' 04:30 - 05:00 0.50 CLEAN P DECOMP Make up topdrive, break circulation, wash from 2,694' to 2,750' 380 gpm 710 psi. 05:00 - 06:30 1.50 CLEAN P DECOMP Drill cement from 2,750' to 2856' 380 gpm, 780 psi, 50 rpm, torque 4500 ftIlbs. 80 to 90 fph. 06:30 - 12:00 5.50 STCTPL P DECOMP Time drill off cement plug, from 2,856' to 2,886',3 fph for 3',5 fph for 10', 10 fph for 17' maintaining a 15L toolface, 390 gpm, 1,240 psi on bottom, 1,100 psi off bottom, up wt == 97k, dn wt = 95k 12:00 - 14:30 2.50 STCTPL P DECOMP Continue drilling from 2,886' to 2,932', maintaining 50 psi differential pressure on motor, holding 15 to 20L toolface, began rotating from 2,932' to 2,962', 2k wob, 60 rpm, torque 4.5k, 425 gpm, 1,400 psi on bottom, 1,280 psi off bottom. 14:30 - 15:30 1.00 STCTPL P DECOMP Displace well to 9.2 ppg LSND mud, @ 425 gpm, 1,260 psi. 15:30 - 16:30 1.00 DRILL P INT1 Pull back inside casing to 2,758', rig up and perform LOT, 2,856 md, 2,828' tvd, mud wt 9.2 ppg, pressure attained 820 psi, EMW 14.7. Printed: 2f7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11125/2004 16:30 - 17:00 0.50 DRILL P INT1 RIH to 2,950' obtain clean hole ECD @ 400 & 600 gpm, 60 rpm, clean hole ECD = 9.53. 17:00 - 21 :00 4.00 DRILL P INT1 Directional drill 8 3/4" hole from 2,962' to 3,463', wob 2-5k, 570 ,gpm, 1,650 psi on bottom, 1,500 psi off bottom, 60 rpm, torque 15 k on bottom 4.5k off bottom, up wt = 104k, dn wi = 94k, st wt = 100k, ECD = 9.75. When pumping 600 gpm, losing mud over shakers, change screens during connection. While making connection hydraulic hose on topdrive started leaking, 21 :00 - 00:00 3.00 DRILL N RREP INT1 POH to 2,789', blow down topdrive, Repair hose on topdrive. 11/26/2004 00:00 - 03:00 3.00 DRILL N RREP INT1 Repair topdrive, RIH to 3,463' 03:00 - 12:00 9.00 DRILL P INT1 Directional drill 8 3/4" hole from 3,463' to 4,422', wob 2-10k, 570 gpm, 1,830 psi on bottom, 1,730 psi off bottom, 80 rpm, torque 6-7 k on bottom 4-5k off bottom, up wt = 111 k, dn wt = 100k, st wi = 102k, ECD = 9.95 112:00 - 22:30 AST = .70 ART = 3.08 10.50 DRILL P INT1 ! Directional drill 8 3/4" hole from 4,422' to 5,480', wob 10-20k, 550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm, torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn wi = 110k, st wi = 120k, ECD = 10.04 calculated clean hole ECD = 122:30 - 23:30 9.54 1.00 DRILL P INT1 Pump 20 bbllow vis sweep, followed by 20 bbl high vis weighted (10.2 ppg) sweep at 550 gpm 1,990 psi, rotating string 100 rpm, 4.5k torque, pumped sweep in order to keep ECD at or below the .60 ppg over clean hole limit through this section. 23:30 - 00:00 0.50 DRILL P INT1 Directional drill 8 3/4" hole from 5,480' to 5,495', wob 10-20k, 550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm, torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn WI = 110k, st wi = 120k, ECD = 9.92 calculated clean hole ECD = 9.48 ART = 3.55 AST = .90 11/27/2004 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8 3/4" hole from 5,495' to 6,125", wob 2-1 Ok, 550 gpm, 2,100 psi on bottom, 1,900 psi off bottom, 100 rpm, torque 6-7 k on bottom 5-6k off bottom, up WI = 135k, dn wt = 115k, st wi = 125k, ECD = 9.90 when sliding 10.04 when rotating. Having to cycle pumps several times to get survey, clean suction screens and check pulsation dampner pressure on both pumps during connection, seemed to help. Continue to backream slowly on connections to keep ECD within set parameters. ART = 1.35 AST = 5.72 12:00 - 18:30 6.50 DRILL P INT1 I Directional drill 8 3/4" hole from 6,125' to 6,485', wob 5-15k, 1565 gpm, 2,240 psi on bottom, 2,110 psi off bottom, 100 rpm, ,torque 8-9 k on bottom 7-8k off bottom, up wt = 130k, dn wt = 107k, st wt = 116k, ECD = 10.0. Developed leak on topdrive gear box oil cooler. ART = .64 AST = 3.46 18:30 - 19:30 1.00 DRILL N RREP INT1 Blow down topdrive, made up circulating head, circulate @ 50 gpm, 240 psi, while trouble shooting problem. Decision was made to pull to shoe to make repairs. I Printed: 2f7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 19:30 - 22:00 POH from 6,485' to 2,866', pulled 20k over at 5,652' wiped through one time, no excess drag pulling back through, pulled to the shoe with no problems. hole took proper fill. 22:00 - 00:00 2.00 DRILL N RREP INT1 Remove oil cooler from topdrive,take to shop for repairs, clean oil from topdrive and windwalls, clean floor. 11/28/2004 00:00 - 02:00 2.00 DRILL N RREP INT1 Clean rig floor and topdrive, unable to repair oil cooler bypass cooler, fill gear box with oil took 10 gallons to fill. Test run 02:00 - 03:30 I topdrive and check for leaks. 1.50 DRILL N RREP IINT1 RIH from 2,866' to 6435' no problem filled pipe @ 5,580' 03:30 - 03:45 ' 0.25 DRILL P INT1 Make up Topdrive, break circulation, ream from 6,435' to 6,485' no fill 03:45 - 09:00 5.25: DRILL P INT1 Directional drill 8 3/4" hole from 6,485' to 6,880', 5-7k wob, 545 gpm, 2,340 psi on bottom, 2,240 psi off bottom, 100 rpm, 8-9k torque on bottom, 6-7k off bottom, up wt = 135k, dn wt = 100k st wt = 112k, ECD = 9.92. At bottoms up saw some trip gas LEL 80 ppm. ART = 1.55 AST = 1.11 09:00 - 09:30 0.50 DRILL P INT1 Circulate bottoms up @ 545 gpm, 2,400 psi, 100 rpm, 8-9k torque, reciprocate full stand. 09:30 - 13:00 3.50 DRILL P INT1 MAD pass from 6,880' to 5,872', pumping 550 gpm, 2,400 psi, 113:00 - 13:30 100 rpm, 8k torque, 600 fph. 0.50 DRILL P INT1 RIH fro 5,872' to 6,880' no problem going in hole. 13:30 - 15:00 1.50 DRILL P INT1 Pump 20 bbllow vis sweep, 20 bbl high vis weighted sweep, 575 gpm, @ 2,600 psi, 110 rpm, 9k torque, sweep brought back a significant amount of cuttings. 15:00 - 19:00 4.00 DRILL P INT1 Monitor well, POH to BHA no hole problems, monitor well at BHA 19:00 - 22:00 3.00 DRILL P INT1 Rack back HW and jars, RIB DCs, PJSM handling sources, remove sources, down load MWD, UD bit motor and MWD. 22:00 - 23:30 1.50 DRILL P IINT1 Clear floor of all directional tools, clean floor 23:30 - 00:00 0.50, EVAL P ,INT1 Remove snow from pipe shed ramps, load MDT logging tools in pipe shed. 11/29/2004 00:00 - 00:30 0.50 EVAL P INT1 Continue loading pipe shed with Schlumberger MDT tools 00:30 - 01 :00 0.50 EVAL P INT1 PJSM with all rig personnel, Co Rep, Toolpusher, Schlumberger crew, picking up logging tools. 01 :00 - 03:00 2.00 EVAL P INT1 Make up MDT logging tools per Schlumberger representative. 03:00 - 03:30 0.50 EVAL Ip 'INT1 Latch up docking head and test logging tools. Rig up wire line Ip sheave in derrick, make up xo to logging tools. 03:30 - 10:00 6.50 EVAL INT1 RIH with MDT tools on 4" DP 1 min perl stand fill DP @ 2,859', fill every 5 stands in open hole, RIH to 5,293' 10:00 - 12:00 I 2.00 EVAL P INT1 Pickup single of 4" DP, make up xo's and side entry sub, RIH with e-line, pumping @ 20 gpm to latch up head. Up wt = 105k, dn wt = 90k. 12:00 - 12:30 0.50 EV AL P INT1 ¡Test MDT tool string, and side entry sub packoff. 12:30 - 00:00 11.50 EVAL P INT1 . Logging with Schlumberger, taking pressure samples as directed by on site Geologist, took a total of 31 samples, 22 attempts failed due to lost seal or dry sample. The 9 samples that were recorded were from the following depths. Up wt = 140k, Dn wt = 100k. Mb1 - 5,531' Mc - 5,728' Mc - 5,747' Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11129/2004 12:30 - 00:00 11.50 EVAL P INT1 Nb - 5,849 OA - 6,000' OA - 6,060' OBb - 6,235' OBb - 6,247' OBd - 6,820' 11/30/2004 00:00 - 22:00 22.00 EVAL P INT1 - Run MDT logs taking fluid samples @ depths per on-site Geologist. Good fluid samples @ 8 of 11 stations. 6824' - good sample in OBd 6117' - good sample in OBa 6000' - good sample in OA 6496' - no good - OBc 6490' - no good - OBc 6424' - no good - OBc 6403' - good sample in OBc 6247' - good sample in OBd 6060' - good sample in OA 5748' - good sample in Me 5532' - good sample in Mb1 - Rig crew trained on vacuum system usage while logging. - Full derrick inspection completed. - RA tags inserted in cementralizers on 4 jts of 7 5/8" casing. 22:00 - 22:30 0.50 EVAL P INT1 - POH to 5293'. 22:30 - 00:00 1.50 EVAL P INT1 - RID side entry sub & XO's. 12/1/2004 00:00 - 00:30 0.50 EVAL P INT1 - Break circ - monitor well. - Pump dry job - BID TD. ·00:30 - 03:00 2.50 EVAL P INT1 - POH to logging tools. 03:00 - 05:30 2.50 EV AL P INT1 - B/O & UD logging tools. 05:30 - 06:00 0.50 EV AL P INT1 - Clear & clean rig floor. 06:00 - 08:00 I 2.00 EV AL P INT1 - M/U clean out BHA consisting of: 8 3/4" FDS+VC mill tooth bit, NB stab wi float, PWD, MWD, NM XO, NM spiral DC, NM stab, 2 NM spiral DC's, float I saver sub, jars, XO & 14 jts HWDP. - RIH to 830' & shallow test MWD. 450 GPM - 650 psi. 08:00 - 09:00 1.00, EVAL P INT1 - RIH wI BHA on 4" DP to 2821' & fill pipe. 09:00 - 10:00 1.00 EVAL P INT1 - PJSM - slip & cut 85' drilling line. 10:00 - 10:30 0.50 EV AL P INT1 - Service & lubricate rig. 10:30 - 11 :00 0.50 EV AL P INT1 - RIH wI BHA on 4" DP to 3495'. 11 :00 - 11 :30 0.50 EV AL P INT1 - CBU @ 400 GPM, 770 psi, 40 RPM. - BID TD. 11 :30 - 14:00 2.50 EV AL P INT1 - RIH to TD @ 6880' washing down last 90' & breaking circ @ 5000'. PIU wt 145K, S/O wt 95K on bottom - Washed & worked through tight spots @ 6063',6120',6250' & 6821'. 14:00 - 16:30 2.50 EV AL P INT1 - Pump & circ around 20 bbllow- vis weighted sweep followed by 20 bbl hi-vis sweep @ 600 GPM, 2540 psi, 120 RPM. CBU x 3. - Monitor well - spot lube-tex pill & pump dry job. 16:30 - 19:30 3.00 EVAL P INT1 - POH wI clean out assy to BHA - hole slick. 19:30 - 21 :30 2.00 EVAL P INT1 - UD BHA & clear floor. - Drain stack. 21 :30 - 22:00 0.50 BOPSUP P INT1 - Pull bowl protector & install test plug. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/1/2004 22:00 - 00:00 2.00 CASE P INT1 - PJSM - CIO upper pipe rams to 7 5/8" . - Bring 7 5/8" casing tools to rig floor. 12/2/2004 00:00 - 00:30 0.50 CASE P INT1 - Test door seals to 1,000 psi for 5 min. - RID test equip't. 00:30 - 01 :30 1.00 CASE P INT1 - Make dummy run wI casing hanger on LJ. I - R/U to run casing. i I - Dropped 200T slip segment downhole. 01 :30 - 02:30 1.00 FISH N HMAN INT1 - Discuss options wi Baker, Schlumberger, & Anchorage. Decision to attempt segment retrieval w/slickline & magnet. 02:30 - 03:30 1.00 FISH N HMAN INT1 - Wait on slickline unit to arrive from DS 15. 2.00 I FISH - UD casing tools, set bowl protector, P/U & install short bails & elevators. 03:30 - 05:30 IN HMAN INT1 Prepared rig floor for slickline equip't. I - M/U Baker tools - 8" magnet & 3 XO's to 3/4" sucker rod conn. - Spot slickline unit & load tools in pipeshed. 05:30 - 08:00 2.50 FISH N HMAN INT1 - PJSM - R/U slickline unit wI lubricator for pressure control. 08:00 - 14:30 ' 6.50 FISH N HMAN INT1 - RIH wI magnet - tagged up @ 2831' WLM & slowly POH - No I fish. I - RIH to 2851' & tagged up - Pushed fish to 2854' & set down @ 2854' x 3. POH - no fish. - RIH to 2854' & tagged fish. Pushed & worked fish to 3092'. POH wI indication of fish on magnet until 2811 '. Lost weight. RIH & tagged up @ 2811 '. Could not work past 2811'. POH - no fish. - RIH & tagged up @ 2820'. Slowly worked magnet - fish moving downhole. Tagged up @ 3120' - POH wI good indication of fish on magnet. Lost fish @ 2958'. RIH to 3250' & tag fish. POH wI good indication of fish & lost fish @ 2932'. RIH & tagged fish @ 3000' & POH to 2932' losing fish @ 2932' x 5. POH wI Slickline, No Recovery. 14:30 - 15:30 1.00 FISH N HMAN INT1 - CIO slickline assy to LIB. RIH & pushed fish to 3330' in attempt to obtain impression of fish. POH & UD LIB wI slight impression of fish, nothing conclusive. 15:30 - 17:30 I 2.00 FISH N HMAN INT1 - M/U grabber tool assy & RIH. Push fish to 3800' & attempt to latch fish. Hole getting sticky - POH - no fish. 17:30 - 18:30 , 1.00 FISH N HMAN INT1 - PJSM - RID slickline. 18:30 - 20:30 2.00 BOPSUF P IINT1 - PJSM - drain stack, pulled bowl protector & installed test plug. - C/O top pipe rams from 75/8" to 3 1/2" x 6" variables. 20:30 - 21 :00 0.50 BOPSUP P INT1 - PJSM - R/U test equip't. 21 :00 - 00:00 3.00 BOPSUF P INT1 - Test BOPE per BP & AOGCC regs to 250 I 3500 psi for 5 I 5 min. Witness of test waived by AOGCC Rep Chuck Scheve. 12/3/2004 00:00 - 01 :00 1.00 BOPSUF P INT1 - RID BOPE test equip't, BID choke & kill lines, pulled test plug & installed bowl protector. 01 :00 - 04:00 3.00 FISH N HMAN INT1 - P/U & M/U BHA # 10 for pushing junk to bottom consisting of: 85/8" "metal muncher" bladed mill, boot basket, bit sub, oil jars, XO, 3 61/4" DC's, 2 XO's & 12 jts HWDP. 04:00 - 08:30 4.50 FISH N HMAN INT1 - Thaw out kelly hose. - B/O kelly hose @ standpipe gooseneck & thaw ice plug wI ,steam hose. P/U & M/U kelly hose. 08:30 - 10:30 2.00 FISH N HMAN liNn 1- RIH wi clean out assy on 4" DP to 2850' & broke circ. I Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/3/2004 08:30 - 10:30 2.00 FISH N HMAN INT1 - RIH from 2850' to 3600' & broke circ 3 BPM 500 psi. After I pumping 10 bbls pressure increased to 2000 psi. Bled off & attempted to pump - pressure increased to 2500 psi. Bled off I pressure, checked surface system - system clear. Drill string plugged off. 10:30 - 12:00 1.50 FISH N HMAN INT1 - Attempted to unplug drill string wlo success. POH to 2800' & I attempted to unplug drill string wlo success. 12:00 - 14:00 2.00 FISH IN HMAN INT1 - POH wet wI 4" DP to BHA. 14:00 -15:00 1.00 FISH N HMAN INT1 - BID BHA & cleaned out plugged mill. 15:00 - 16:001 1.00 FISH N HMAN INT1 - M/U BHA for pushing junk to bottom. 16:00 - 17:30 I 1.50 FISH N HMAN INT1 - RIH wI clean out assy on 4" DP to 3600' filling @ 2850'. 17:30 - 18:00 0.50 FISH N HMAN INT1 - CBU @ 3600'.550 GPM 1300 psi. 18:00 - 21:30 3.50 FISH N HMAN INT1 - RIH from 3600' @ 1.5 min per stand & tag fish wi 20K @ 5687'. Stack 20K x 3, & 30K x 2 in attempt to move fish. P/U 15' & break circ. - Stack 20K x 2 on fish wi pumps on - 650 GPM, 2220 psi - no movement. - Circulate on top of fish wi no wt on mill for 30 min - 700 GPM, 2630 psi - P/U & rotate 10, 20, & 60 RPM wi different wts. on mill from 1 to 15K. On junk Tq 2 to 3K higher than off bottom Tq. P/U wt 135K, S/O wt 105K, Rot wt 117K. - WOM 10K, 10 RPM, pump rate 700 GPM, 2630 psi, Tq 5K. I Mill torqued up, fish fell down hole. Worked stand x 2 wI no drag. 21 :30 - 22:30 I N HMAN INT1 - RIH from 5687' to 6632'. 1.00 I FISH 22:30 - 00:00 1.50 FISH N HMAN INT1 - Tag fish @ 6632' w/20K. P/U & stack 50K on fish x 5 - no movement. - Circulate on top of fish wi no wt - 700 GPM 2850 psi for 15 I min. I - Mill on fish w/5K WOM, 10 RPM, off bottom Tq 4K, on bottom Tq 7 to 9K, 700 GPM 2850 psi. IHMAN - Push fish from 6632' to 6640'. 12/4/2004 00:00 - 01 :00 1.00 FISH N INT1 - Milled & washed on fish from 6640' to 6880'. WOM 10K, 10 IHMAN RPM, TQ 7-9K, pump pressure 2160 psi @ 600 GPM. 01 :00 - 03;00 2.00, FISH N INT1 - At TD stack 50K to 60K wt on fish x 5.600 GPM 2150 psi I - Mill new hole from 6880' to 6885'. WOM 5K to 14K, 100 RPM, , I Tq 7 - 8K, 600 GPM 2180 psi. I I I ¡HMAN - Work string from 6885' to 6865' x 10. 03:00 - 05;00 2.00 FISH N INT1 - Pumped 20 bbllow-vis weighted sweep followed by 20 bbl I hi-vis sweep & CBU x 3.600 GPM 2150 psi 120 RPM. I - Monitored well. I 05:00 - 06:00 1.00 FISH N IHMAN INT1 - Pump lube pill - pump dry job - BID equip't. 06:00 - 06:30 0.50 FISH N ¡HMAN INT1 - POH from 6885' to 6632'. - Pulled tight wi 40K overpull. 06:30 - 13:30 7.00 FISH N HMAN INT1 - Attempted to RIH from 6632' wlo success. Stacked 50K on mill & engaged pumps, 610 GPM 2050 psi. Could not rotate pipe. Continued to work pipe & obtained rotation wI 20 RPM, Tq 5 - 20K. Worked string. - Backreamed out of hole fromm 6632' to 6435' @ 120 RPM, 610 GPM 2000 psi. Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1214/2004 06:30 - 13:30 7.00 FISH N HMAN INT1 - Hung up @ 6434' - pump rate 610 GPM, 2000 psi. Could not rotate. Worked drill string & jarred up wI 50K overpull x 4. - Obtained rotation & backreamed out of hole dragging fish ¡ from 6434' to 5477'. IHMAN - Lost drag @ 5500'. POH from 5479' to 5380' wI no drag. 13:30 - 15:30 2.00 I FISH N INT1 - BID TO. I I - POH from 5380' to BHA pulling slowly through 9 5/8" shoe wI no drag. 15:30 - 17:30 2.00 FISH N HMAN INT1 - POH, clean & BIO BHA. 17:30 - 18:30 1.00 FISH N HMAN INT1 - Clear & clean floor. Loaded new BHA tools & brought to rig floor. 18:30 - 19:00 , 0.50 FISH N HMAN INT1 - Service TD. , 19:00 - 19:30 ! 0.50 FISH N HMAN INT1 - Loaded additional collars in pipeshed & brought additional mills to rig floor for current BHA. 19:30 - 21 :30 2.00 FISH N HMAN INT1 - M/U BHA consisting of: 8 1/8" tapered mill, 83/8" string mill, XO, float sub, NM spiral DC, XO, 8 3/8" string mill, XO, NM spiral DC, 8 1/2" string mill, oil jars, NM spiral DC, XO, 3 DC's, 21 :30 - 00:00 r 12 XO's & 12 jts 4" HWDP. 2.50 FISH N HMAN INT1 - RIH to 5005'. Filled pipe @ 2800'. 12/5/2004 00:00 - 01 :00 1.001 FISH N HMAN INT1 1- RIH from 5005' to 5775'. Filled pipe @ 5200'. - No drag while running in hole wi S/O wt 105K. At 5775' picked up stand to check drag on upstroke & tagged junk wI 25K overpull @ 5695'. 01 :00 - 02:30 1.50 FISH N HMAN INT1 - Backream stand from 5775' to 5679 x 3 - 60 RPM, 600 GPM, 2280 psi. I - Increase rotary to 100 RPM & backream stand from 5775' to 5679' x 7. Shut off rotary & pumps & work stand - no drag up or down. - Rack back stand & check drag on upstroke from 5679' to 5583'. No drag. - RI H to 5871' - P/U from 5871' to 5775' to check for drag. No drag 102:30 - 03:30 ¡ 1.00 FISH N HMAN INT1 - RIH from 5871' to TD @ 6885' wI no problems. Checked for drag from 6542' to 6446', 6736' to 6639', & from 6885 to 6832'. 03:30 - 05:00 1.50 FISH N HMAN INT1 - Pumped 20 bbllow vis weighted sweep followed by 20 bbl hi-vis sweep & circulate surface to surface & additional B/U. 05:00 - 06:30 1.50 FISH N HMAN INT1 - Monitor well - POH from 6885' to 5200' wi no drag. Monitor well - static. Pump dry job & BID TD. 06:30 - 10:00 3.50 FISH N HMAN INT1 - POH wi 4" DP to BHA - no drag. 10:00 - 12:30 2.50 FISH N HMAN INT1 - BIO & UD BHA. 12:30 - 13:00 0.50 FISH N HMAN INT1 - Cleared & cleaned rig floor. I 13:00 - 13:30 0.50 BOPSUF N HMAN INT1 - PJSM - drained stack, pulled bowl protector & installed test HMAN IINT1 plug. 13:30 - 15:00 1.50 BOPSUP N CIO upper rams to 7 5/8". - Tested door seals to 1000 psi. Pulled test plug. 15:00 - 15:30 0.50 CASE N HMAN INT1 - PJSM for rigging up & running casing. 15:30 - 17:00 1.50 CASE N HMAN INT1 - R/U 7 5/8" casing handling equip't. 17:00 - 20:00 3.00 CASE P INT1 - MIU & run 33 jts. 75/8" 29.7# L-80 STL FJ casing. - Bakerlok connections on pin end of jts 2 & 3. Broke circulation & checked floats - floats holding. M/U to 5200 ftllbs Tq and I utilizing Jet Lube Seal Guard thread compound on I Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1215/2004 17:00 - 20:00 3.00 CASE P INT1 connections. 20:00 - 21 :00 1.00 CASE N SFAL INT1 1- Dropped casing jts between pit complex & pipeshed. Secure area & stand down for safety. Discuss & review incident wI all crew members. 21 :00 - 22:30 1.50 CASE N SFAL INT1 1- Reposition casing in yard to facilitate loading ODS portion of I pipeshed & load casing. 22:30 - 00:00 1.50 CASE P INT1 - Run 75/8" 29.7# L-80 STL FJ casing to 2112' filling every jt i via Frank's fill up tool. 12/6/2004 00:00 - 01 :30 1.50 CASE P INT1 - Run 7 5/8" 29.7# L-80 STL FJ casing to 2839' filling every jt wi Frank's fill up tool. - M/U to 5200 ftllbs Tq. & utilizing Jet Lube Seal Guard thread compound on connections. 01 :30 - 02:00 0.50 CASE P INT1 - CBU x 2 @ 9 5/8" casing shoe. 4 - 5 SPM wI no losses. - 4 BPM 370 psi, 5 BPM 400 psi. - P/U wt 115K, SIO wt 110K. 02:00 - 10:30 8.50 CASE P INT1 - Continue running 7 5/8" 29.7# STL FJ casing into OH @ 60 I see I jt breaking circulation every 20 jts. Running speed 6 min 'per jt while breaking circulation. - Wash last jt down @ 5 BPM 640 psi. - Ran a total of 167 jts, 2 19.9' & 210' pup jts. RA tags @ 6703',6346',6062' & 5940'. 10:30 - 11 :00 0.50 CASE P IINT1 - S/O & UD Frank's tool - M/U cement head. 11 :00 - 13:00 2.00 CEMT P ¡INT1 - Staged up pumps - circ & cond mud @ 2 BPM 330 psi, 4 I BPM 530 psi & 5 BPM 590 psi. · Reciprocated 5' while circulating. Took 350K to obtain pipe movement - P/U wt 225K, SIO wt 127K after initial movement. · Held PJSM wi Rig Crew, Cementers, Truck Drivers, Mud Eng, Tool Pusher & Co. Rep while circulating. 13:00 - 15:00 2.00 CEMT P INT1 - Pumped 5 bbls fresh water & tested lines to 4,000 psi. Pumped 20 bbls CW 100 @ 4 BPM 600 psi followed by 30 bbls 10.2 ppg Mud Push @ 4.5 BPM 650 psi. Dropped bottom plug & pumped 49 bbls (229 sx) 15.8 ppg Class G cement. Dropped top plug and pumped 10 bbls fresh water via Cementers @ 5 BPM 290 psi. - Switched over to rig pump & displaced wi 301.8 bbls Seawater at following rates: Pumped Rate Pressure 50 bbls 5 bpm 300 psi 100 bbls 5 bpm 400 psi 150 bbls 5 bpm 450 psi 200 bbls 5bpm 475 psi 250 bbls 5 bpm 550 psi Slowed Rate to 3 bpm wi 292 bbls pumped. Bumped plug wI 1,900 psi & held pressure for 3 min. · Bled off pressure & checked floats - floats held. - CIP 1500 hrs. 15:00 - 16:30 1.50 CEMT P INT1 - RID cement equip't & cleared floor. · CIO bails & elevators. 16:30 - 17:00 0.50 CASE P INT1 · PJSM - Installed 9 5/8" x 7 5/8" packoff & tested to 5,000 psi for 10 min. Good test. 17:00 - 19:30 2.50 BOPSUF P INT1 - PJSM - Installed test plug & CIO upper rams from 7 5/8" to 3 1/2" x 6" variables. - R/U test equip't & tested door seals to 1,000 psi - RID test Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/6/2004 17:00 - 19:30 2.50 BOPSUP P INT1 equip't & pulled test plug. 19:30 - 20:00 0.50¡CASE P INT1 - Serviced TD. 20:00 - 21 :00 1.00[ DRILL P PROD1 - Load BHA tools on floor. - M/U 63/4" BHA - 6 3/4" PDC bit, mud motor dialed in to 1.5 121 :00 - 00:00 deg bend & 6 3/4" stab. 3.00 DRILL N DPRB PROD1 - RIH & tag up @ 27.7' wI PDC bit. POH & inspect bit. - RIH & tag up @ 27.7' - Apply 5K wt to bit - no go. Apply 5K wt to bit @ 5 RPM - no go. - Change setting on motor to 0 deg bend & RIH - no go - POH & remove bit. RIH wI motor & 6 5/8" sleeve on motor & able to RIH to 31' wlo tagging up. 12/7/2004 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 Attempt to RIH wi two different PDC bits & tagged up @ 27.7'. 01 :00 - 02:30 1.50 DRILL P PROD1 PJSM - Line up to OA & test line to 3000 psi. Pumped 50 bbls mud down annulus @ 1 BPM. SPM Pressure Total stks 12 630 120 12 610 180 12 660 240 13 720 300 13 720 360 13 710 420 13 700 480 13 700 540 13 700 588 02:30 - 03:00 0.50 DRILL N DPRB PROD1 UD drilling BHA. 03:00 - 04:00 1.00 DRILL N DPRB PROD1 MU 6-3/4" string mill with a stabilizer and a 6-1/4" DC. 04:00 - 04:30 0.50 FISH N DPRB PROD1 Mill through obstruction @ 27.7'. Milled for - 6" & cleaned up area. Ran mill wlo rotatating to 167' to ensure clear below. 04:30 - 05:00 0.50 DRILL N DPRB PROD1 UD milling BHA. 05:00 - 07:30 ¡ 2.50 DRILL P PROD1 I RU test equipment. Close blind rams and test csg to 3500 psi 107:30 - 10:30 I for 30 minutes. Bleed pressure, open rams and RD test , equipment. 3.00 DRILL ¡p PROD1 PU and MU 6-3/4" directional BHA #14 10:30 - 14:30 4.00 DRILL P PROD1 RIH to 2250' with 6-3/4" directional BHA. Shallow test MWD @ ¡685'. SymOps: PJSM. RU Little Red to 7-5/8" X 9-5/8" annulus. Test lines to 3000 psi. Inject 45 bbls dead crude to freeze protect. IPR 2 bpm @ 1500 psi FPR 2 bpm @ 1500 psi. Shut in with 950 psi, pressure bled to 250 psi by midnight 14:30 - 16:00 1.50 DRILL P PROD1 Change out saver sub and service top drive. 16:00 - 21 :00 5.00 DRILL P PROD1 Continue RIH from 2250' to 6050' picking up DP from pipe shed 21 :00 - 22:00 1.00 DRILL P PROD1 Cut and slip 60' of drill line. 22:00 - 22:30 0.50 DRILL P PROD1 Circulate a drill string volume to ensure DP free of obstructions. 22:30 - 23:30 1.00 DRILL P PROD1 RIH from 6050' to 6625'. MU top drive and wash last stand 0.50 I DRILL down down, tagged up on cement stringers @ 6740' 23:30 - 00:00 P PROD1 Wash and ream down from 6740' cleaning up cement stringers. 12/8/2004 00:00 - 01 :30 1.50 I DRILL P PROD1 Continue washing and reaming down to 6781' cleaning up Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1218/2004 00:00 - 01 :30 1.50 DRILL P PROD1 cement stringers to the float collar. 01 :30 - 02:00 0.50 DRILL P PROD1 PJSM with Veco and all rig personnel on displacing to MOBM. 02:00 - 03:00 1.00 DRILL P PROD1 Pump 20 bbl L VT spacer followed by MOBM to displace well to .9.2 ppg MOBM, 215 gpm @ 1000 psi 03:00 - 05:00 2.00 DRILL P PROD1 Circulate surface to surface X 2 to shear and warm MOBM. 330 gpm @ 2500 psi. 05:00 - 08:00 3.00 DRILL P PROD1 Drill shoe track cement from 6781' to 6870'. Clean out 8-3/4" rathole from 6870' to 6885' and drill 23' of new hole to 6908' ,WOB = 5 klbs RPM Surf= 50, DH = 225 GPM = 285 @ 2100 psi on Btm Torque = 3k FtLbs 08:00 - 09:30 1.50 DRILL P PROD1 ,PJSM. Break off stand and pull bit inside 7-5/8" csg. Perform i 10.5 ppg EMW FIT, 411 psi surf pressure at 5265' TVD with 9.0 ppg mud in the hole. Baseline ECD = 9.89 ppg ,09:30 - 14:00 4.50 DRILL P I PROD1 . Directional drill from 6908' to 7197', sliding as required to I maintain inclination and azimuth. I 1 WOB = 3-5 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2900 psi on Btm, 2570 psi off Btm P/U 125k S/O 97k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Calculated ECD = 10.09 ppg Actual ECD = 10.45 ppg 14:00 - 15:00 1.00 DRILL P PROD1 POH to 7033' and RIH picking up 30' surveys to 7197 15:00 - 00:00 9.00 DRILL P PROD1 Directional drill from 7197' to 7869', sliding as required to maintain inclination and azimuth. WOB = 3-5 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3100 psi on Btm, 2800 psi off Btm P/U 125k S/O 90k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30' Calculated ECD = 10.10 ppg Actual ECD = 10.47 ppg ART last 24 hrs. =2.23 hrs. AST last 24 hrs. = 4.33 hrs. Total drilling hours = 6.56 hrs 12/9/2004 00:00 - 00:00 24.00 DRILL P PROD1 Directional drill from 7869' to 9851', sliding as required to maintain inclination within constraints provided by rig site geologist to maximize reservoir contact. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/1 9/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1219/2004 . 00:00 - 00:00 24.00 DRILL P PROD1 WOB = 4-7 klbs RPM Surf= SO, DH = 260 GPM = 330 @ 3320 psi on Btm, 3120 psi off Btm I¡TOrqUe = 7k FtLbs on Btm, 6k FtLbs of Btm P/U 13Sk SIO SSk ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Circulate lo-vis and weighted sweeps as required to ensure clean hole conditions. Calculated ECD = 10.23 ppg Actual ECD = 10.47 ppg 12/10/2004 00:00 - 00:00 24.00 DRILL P ART last 24 hrs. = 5.92 hrs. AST last 24 hrs. = 2.93 hrs. Total drilling hours = S.S5 hrs PROD1 Directional drill from 9S51' to 1170S', sliding as required to maintain inclination within constraints provided by rig site geologist to maximize reservoir contact. WOB = 4-11 klbs RPM Surf= SO, DH = 260 'GPM = 330 @ 3550 psi on Btm, 3200 psi off Btm Torque = 7-Sk FtLbs on Btm, 6-7k FtLbs of Btm P/U 132k SIO 75k ROT 107k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Circulate sweeps as required to ensure clean hole conditions. Calculated ECD = 1 0.S2 ppg Actual ECD = 11.02 ppg 12/11/2004 00:00 - 05:00 5.00 DRILL P ART last 24 hrs. = 3.93 hrs. AST last 24 hrs. = 4.50 hrs. Total drilling hours = S.43 hrs PROD1 Directional drill from 1170S', to TD of lateral #1 at 12190' sliding as required to maintain inclination within constraints provided by rig site geologist to maximize reservoir contact. WOB = 3-6 klbs RPM Surf= SO, DH = 260 GPM = 330 @ 3730 psi on Btm, 3240 psi off Btm Torque = Sk FtLbs on Btm, 7.5k FtLbs of Btm P/U 144k SIO 70k ROT 109k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30', Calculated ECD = 10.91 ppg Actual ECD = 11.30 ppg ART last 24 hrs. = 1.10 hrs. Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12111/2004 00:00 - 05:00 5.00 DRILL P PROD1 AST last 24 hrs. = 0.90 hrs. Total drilling hours = 2.00 hrs 05:00 - 07:30 2.50 DRILL P PROD1 ,CBU X 2, to circulate and condition hole. I I RPM = 80 330 gpm @ 3200 psi. IntiaJ ECD = 11.25 ppg Final ECD = 11.10 ppg Calculated ECD = 10.91 ppg 07:30 - 09:30 2.00 DRILL P PROD1 POH for wiper trip to csg shoe from 12190' to 11703', 35 klbs drag and swabbing 09:30 - 17:00 7.50 DRILL P PROD1 MU top drive and back ream out from 11703' to 6813'. RPM = 80 GPM = 330 @ 3000 psi 'p Torque = 8-10k FtLbs 17:00 - 18:00 1.00 DRILL PROD1 CBU X 2 at the 7-5/8" csg shoe. 18:00 - 19:00 1.00 DRILL P PROD1 Service top drive, blocks, crown, drawworks and iron roughneck. 19:00 - 22:00 3.00 DRILL P PROD1 RIH to 12096' filling DP every 20 stands. Work through tight spots from 11710' to 12096' 22:00 - 23:00 1.00 DRILL P PROD1 MU top drive and wash last stand to bottom at 12190' 23:00 - 00:00 1.00 DRILL P PROD1 Pump a 20 bbllo-vis sweep followed by a 20 bbl weighted sweep. RPM = 80 330 gpm @ 3300 psi. 12/12/2004 00:00 - 02:00 2.00 DRILL P PROD1 Continue circulating BU X 3 to clean and condition hole. RPM = 80 330 gpm @ 3780 psi. Intial ECD = 11.45 ppg Final ECD = 11.19 ppg Calculated ECD = 11.17 ppg SymOps: PJSM. Transfer MOBM from pit module to 400 bbl upright tanks. 02:00 - 02:30 0.50' DRILL P PROD1 PJSM with MI, Veco and all rig personnel on displacing well to SFMOBM. 02:30 - 04:00 1.50 DRILL P PROD1 Displace well to Solids Free MOBM. rate 285 gpm @ 2970 psi 04:00 - 10:30 6.50 DRILL P PROD1 Monitor well - static. POH from 12190' to 6520' to run 4-1/2" liner. Worked through 7-5/8" csg shoe at 6870'. Recorded PI U and S I 0 Weights every 1,000'. Circulated bottoms up at csg shoe, 330 gpm 2,500 psi, RPM 60. 10:30 - 13:30 3.00 DRILL P PROD1 MAD pass from 6520' to 5900' to verify placement of RA tags in 7-5/8" csg. 13:30 - 17:00 3.50 DRILL P PROD1 Continue POH from 5951 to 208'. Recorded PI U and S I 0 Weights every 1,000'. 17:00 - 17:30 0.50 DRILL P PROD1 PJSM with Anadrill and all rig personnel on pulling RA sources and laying down the BHA. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12112/2004 17:30 - 20:00 2.50 DRILL P PROD1 20:00 - 21 :00 1.00 DRILL P PROD1 21 :00 - 21 :30 0.50 CASE P PROD1 21 :30 - 22:00 0.50 CASE P PROD1 22:00 - 00:00 2.00 CASE P PROD1 12/13/2004 00:00 - 05:00 5.00 CASE P PROD1 05:00 - 06:00 1.00 CASE PROD1 06:00 - 07:30 1.50 CASE P PROD1 07:30 - 08:00 0.50 CASE P PROD1 '08:00 - 12:00 4.00 CASE P PROD1 12:00 - 13:30 1.50 CASE P PROD1 13:30 - 16:30 16:30 -17:00 ' 117:00 - 17:30 I Ii 17:30 - 18:30 18:30 - 22:00 ¡ 22:00 - 00:00 12/14/2004 00:00 - 05:30 05:30 - 06:30 3.00 CASE P 0.50 CASE P 0.50 CASE P 1.00 CASE P 3.50 STWHIP P 2.00 STWHIP P 5.50 STWHIPI P 1.00 STWHIP¡ P PROD1 PROD1 PROD1 PROD1 WEXIT WEXIT WEXIT WEXIT 06:30 - 09:00 2.50 STWHIP P WEXIT 09:00 - 15:00 6.00 STWHIP P WEXIT LD BHA #14, Clear floor and remove RA sources. Clean and clear rig floor. Rig up to run 4-1/2" liner PJSM with Baker and all rig personnel on picking up and running 4-1/2",12.6#, IBT-M, L-80 liner. PU and RUN 4-1/2", 12.6#, L-80, IBT-M slotted liner. Continue PU and RUN 4-1/2",12.6#, L-80, IBT-M slotted liner. Ran 127 jts slotted liner, 10 jts solid liner, average MU torque 2200 FtLbs. A free floating 5-3/4" centralizer was run on each joint, except the shoe joint. MU seal bore extension, ZXP liner top packer and liner hanger with liner running tool. RD 4-1/2" tbg equipment. RIH with 4-1/2" liner on DP to 7-5/8" csg shoe @ 6870. Circulate 1-1/2 X the string volume. 6 bpm @ 880 psi Continue RIH with 4-1/2" liner on DP, break circulation every 15 stands. Record PIU and S/O weights every 500'. MU top drive and break circulation. Drop setting ball. RIH and tag up at 12190'. PU and space out liner top at 6446, shoe at 12184'. Stage up pump and pump ball on seat, 2 bpm @ 270 psi. Increase pressure to 2000 psi to set liner hanger, stack ·20k Ibs on liner to verify hanger set. Increase pressure to 4000 psi to set ZXP packer. Bled down pressure and closed annular, tested packer to 1500 psi for 5 minutes. Monitor well - static. POH with 4" DP. Break out and LD liner running tool. Clean and clear rig floor. Service top drive, blocks and iron roughneck. MU whipstock assembly. PU and Orient MWD. PU 12 jts of 4-3/4" DC's and 24 jts of 4" HWDP. RIH wi Whipstock Assembly on 4" DP to 6,399'. MU top drive and orient whipstock. RIH and set whipstock anchor and dummy seal assembly at 6,457'. Whipstock slide oriented 14 deg left of highside. Set down whipstock trip anchor wI 20,000# slackoff, stacked addtional1 0,000# on anchor to ensure set. PU wI 10,000# overpull to check anchor set. Stacked 40,000# on mill and sheared free from whipstock. PU to neutral weight and rotated drill string to ensure mills sheared free from whipstock slide. Top of whipstock at 6,397'. Held PJSM. Displaced well bore from SFMOBM to MOBM. Pump rate 3 bpm @ 1,200 psi. Total displacement 240 bbls. Took returns of SFMOBM back to pit #3 and hauled to MI plant for reconditioning. Circulated mud system one full surface to surface to condition mud. Mill window from 6397' to 6409'. Continue milling and dressing window to 6423'. WOM = 5 klbs RPM = 100-110 GPM = 285 @ 1910 psi Torque = 5-8k FtLbs P/U 120k S/O 11 Ok ROT 105k 100 Ibs of metal recovered Printed: 2n/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12114/2004 15:00 - 16:30 1.50 STWHIP P WEXIT Circulate 35 bbl hi-vis sweep around to clean metal from hole. 16:30 - 18:30 2.00 STWHIP P WEXIT ' Monitor well - static. Slug DP and POH with milling assembly. 18:30 - 20:30 2.00 STWHIP P WEXIT Stand back HWDP and DC's. LD milling BHA. 20:30 - 22:00 1.50 BOPSUP P WEXIT Flush and drain BOP stack. Pull wear bushing and install test BOPSU~ P plug 22:00 - 22:30 0.50 WEXIT RU BOP test equipment fill stack with water. 22:30 - 00:00 1.50 BOPSUF P WEXIT Test BOPE to 3500 psi 1250 psi, test annular to 2500 psi 1250 psi for 5 minutes each. Witness of BOP test waived by John Spaulding with AOGCC. 12/15/2004 00:00 - 04:00 4.00 BOPSUF P WEXIT Continue testing BOPE to 3500 psi 1250 psi, test annular to 3500 psi I 250 psi for 5 minutes each. Witness of BOP test waived by John Spaulding with AOGCC. 04:00 - 04:30 0.50 BOPSUP P WEXIT RD test equipment, pull test plug. Drain water from stack to cuttings box. Install wear bushing 04:30 - 05:00 0.50 STWHIP P WEXIT ¡ PJSM with Anadrill and all rig personnel on Picking up and loading RA sources in BHA. 05:00 - 09:00 4.00 STWHIP P WEXIT PU and MU 6-3/4" directional BHA with Hycalog DS146X. Load , RA sources and RIH. I 09:00 - 13:00 I 4.00 STWHIP P WEXIT RIH with BHA #16 on DP. MU top drive and shallow test MWD at 1000'. Break circ every 20 stands on trip in. 13:00 - 14:30 1.50 STCTPL P WEXIT Log down across 2 RA markers and confirm depths at 5933' and 6055' MD DP measurement - OK. Obtain benchmark ECD readings with PWD at 10.08 ppg @ 325 gpm and validate ECD model. 14:30 - 15:30 1.00 STWHIP P WEXIT Cut drilling line. 115:30 - 16:00 0.50 STWHIP P WEXIT MU top drive, orient tool 14 degrees right and RIH passing through window at 6397' without difficulty. Stage up pump and I wash down to TD at 6423'. 16:00 - 00:00 8.00 DRILL P PROD2 Directional drill from 6423', to 6906' as per directional plan. WOB = 5-8 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2820 psi on Btm, 2440 psi off Btm Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm P/U 120k 8/0 95k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.10 ppg Actual ECD = 10.23 ppg ART last 24 hrs. = 1.48 hrs. AST last 24 hrs. = 1.63 hrs. 0.50 I DRILL Total drilling hours = 3.11 hrs 12/16/2004 00:00 - 00:30 P PROD2 Directional drill from 6906', to 7003' as per plan. WOB = 5-10 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm P/U 120k S/O 95k ROT 11 Ok Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/1 9/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12116/2004 00:00 - 00:30 0.50 DRILL P PROD2 Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. I Calculated ECD = 10.13 ppg 1.001 DRILL Actual ECD = 10.40 ppg 00:30 - 01 :30 N RREP PROD2 1 Repair top drive upper kelly valve actuator. 01 :30 - 07:00 5.50 DRILL ,P PROD2 ! Directional drill from 7003', to 7292' as per directional plan. I WOB = 4-7 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2550 psi on Btm, 2410 psi off Btm Torque = 5-6k FtLbs on Btm, 5k FtLbs off Btm P/U 120k S/O 95k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on I down stroke. Survey every 30'. Crossed fault at 6895' MD. Calculated ECD = 10.19 ppg Actual ECD = 10.20 ppg 07:00 - 09:00 , 2.00 DRILL N DPRB PROD2 Saw sudden increase in pump pressure of -700 psi and ECD jump to 10.45 ppg shortly after making a connection. Suspect cuttings avalanching uphole (in casing). Drilling in OBc shale from 7050' MD. Backream out from 7292 - 7090' to clean up hole. Getting back abundant amount of shale cuttings approx 1/8" - 1/4" cubes (angular). Continue slow backreaming until hole cleaned up and pressure & ECD returned to normal. No mud losses noted. 09:00 - 09:30 0.50 DRILL N DPRB PROD2 RIH to bottom - no problems. 09:30 - 13:00 3.50 DRILL P PROD2 Directional drill from 7292', to 7420' as per plan. WOB = 5-10 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm P/U 120k S/O 95k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.13 ppg Actual ECD = 10.40 ppg 13:00 - 15:00 2.00 DRILL N DFAL PROD2 Cuirculate while attempting to reestablish communication with MWDILWD tools. 15:00 - 16:30 1.50 DRILL N DFAL PROD2 Backream from 7420' to 7100' to clean hole prior to trip for MWD. 16:30 - 18:00 1.50 DRILL P PROD2 Communication with MWDILWD re-established. Circulate hole clean and RIH to bottom at 7420'. 18:00 - 23:00 5.00 DRILL P PROD2 Directional drill from 7420', to 7920' as per plan. WOB = 5-9 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3010 psi on Btm, 2860 psi off Btm Torque = 6k FtLbs on Btm, 5k FtLbs off Btm Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/16/2004 118:00 - 23:00 5.00 DRILL P PROD2 P/U 120k S/O 93k ROT 105k Backream each stand at drilling rate, reducing pump rate on I I down stroke. Survey every 30'. I Calculated ECD = 10.29 ppg I 1.001 DRILL Actual ECD = 10.31 ppg i 23:00 . 00:00 P PROD2 Saw pressure and ECD increase with corresponding increase in 1/8" to 1/4" angular to blocky cutting sized shale pieces I across shaker. Circulated weighted sweep surface to surface. 12/17/2004 00:00 . 00:30 0.50 DRILL P PROD2 Continue to circulate weighted sweep out of hole. Sweep brought an increase in cuttings volume across shaker, mostly 1/4" to 1/8" angular to blocky shale and some fine sands. 00:30 . 02:30 2.00 DRILL P PROD2 Directional drill from 7920' to 8059' sliding as required to build into the OBb as per plan. WOB = 9-10 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3140 psi on Btm, 3040 psi off Btm Torque = 5k FtLbs off Btm P/U 123k SIO 93k ROT 1 OSk Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Added 1 drum of HRP to mud system to increase YP and gel strength. Calculated ECD = 10.31 ppg Actual ECD = 10.71 ppg 02:30 - 03:30 1.00 DRILL P PROD2 i Circulate for ECD management, circulating HPR through system. 03:30 - 07:00 3.50 DRILL P PROD2 Directional drill from 8059' to 8347' sliding as required to maintain OBb contact as per plan. WOB = 6-7 klbs RPM Surf= 80, DH = 260 GPM:: 330 @ 3200 psi on Btm, 2970 psi off Btm Torque = 5.5k FtLbs on Btm, 5k FtLbs off Btm P/U 122k S/O 93k ROT 106k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.30 ppg Actual ECD = 10.78 ppg 07:00 - 07:30 0.50 DRILL P PROD2 Circulate for ECD management. 07:30 - 12:00 4.50 DRILL P PROD2 Continue drilling ahead to 8636' MD. Switched from #2 to #1 ,mud pump. MWD quit working shortly after switching pumps. 12:00 - 13:30 1.50 DRILL P PROD2 Circ and pump out of hole 5 stands to try and clear MWD . OK. RIH to bottom. 13:30 - 00:00 10.50 DRILL P PROD2 Directional drill from 8636' to 9400' sliding as required to maintain OBb contact as per plan. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12117/2004 13:30 . 00:00 10.50 DRILL P PROD2 WOB = 6-8 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3400 psi on Btm, 3100 psi off Btm Torque = 8k FtLbs on Btm, 6k FtLbs off Btm P/U 125k SIO 80k ROT 100k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. I Calculated ECD = 10.76 ppg Actual ECD = 11.11 ppg ART last 24 hrs. = 2.88 hrs. AST last 24 hrs. = 4.19 hrs. Total drilling hours = 7.07 hrs 12/18/2004 00:00 - 08:00 8.00 DRILL P PROD2 I Directional drill from 9400' to 10143' sliding as required to I maintain OBb contact as per plan. WOB = 3-4 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3750 psi on Btm, 3440 psi off Btm Torque = 6-7k FtLbs on Btm, 6k FtLbs off Btm P/U 135k S/O 80k ROT 115k Back ream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Circulate 15bbllo-vis sweep around at 9906'. Slide one full stand to get top drive down to rig floor for troubleshooting. Calculated ECD = 10.76 ppg Actual ECD = 11.18 ppg 08:00 - 11 :00 3.00 DRILL N RREP PROD2 After making a slide and connection, top drive would not rotate I or back out of connection. Check out top drive - nothing conclusive seen but possibly a bad encoder that controls TD rotation. 11 :00 - 14:30 3.50 DRILL N RREP i PROD2 Get TD connection broken and back out with rotary table. POH I to window for top drive repairs - also need to replace blower fan I for motors in TD that failed previously. POH to window - no pumping or backreaming possible. Work thru tight spots at 9617',9554-44',9420',9340',9175', 9150-40'. Overpulls to 25 klbs. 14:30 - 21 :30 7.00 DRILL N RREP PROD2 Repair top drive. Replace encoder and purge moisture from upper kelly valve airlines. Blow moter has failed, no spare on Slope but will be able to drill ahead unitl new motor is available. 21 :30 - 22:30 1.00 DRILL N RREP PROD2 RIH to 7956' 22:30 - 23:30 1.00 DRILL N RREP PROD2 MU top drive, stage up pumps and break circulation. TD made up on connection erratically. Top drive saver sub threads have been stripped from pin when making up the stand. Appears to be caused by improper hook-up of new encoder that caused the connection to overtorque. 23:30 - 00:00 0.50 DRILL N ¡RREP PROD2 LD damaged joint of 4" DP. POH to window to change top drive I I Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/18/2004 23:30 - 00:00 0.50 DRILL N RREP PROD2 saver sub. 12/19/2004 00:00 - 01 :00 1.00 I DRILL N RREP PROD2 Continue POH to change out top drive saver sub. 01 :00 - 02:30 1.50 I DRILL N RREP PROD2 Change out top drive saver sub. 02:30 - 04:30 2.00! DRILL N RREP PROD2 RIH to 10132', make up top drive and break circulation at 0.50 I DRILL 8246'. 04:30 - 05:00 N RREP PROD2 Wash last stand to bottom at 10143' 05:00 - 00:00 19.00 DRILL P PROD2 Directional drill from 10143' to 11656', sliding as required to maintain OBb contact as per plan. WOB '" 4-5 klbs RPM Surf", 80, DH '" 260 GPM '" 330 @ 3750 psi on Btm, 3440 psi off Btm Torque", 6-7k FtLbs on Btm, 6k FtLbs off Btm P/U 135k S/O 80k ROT 113k Backream each stand at drilling rate, reducing pump rate on I down stroke. Survey every 30'. ¡Calculated ECD '" 10.76 ppg IActual ECD = 11.18 ppg ART last 24 hrs. = 3.25 hrs. I AST last 24 hrs. = 5.26 hrs. 00:00 - 05:30 I Total drilling hours", 8.51 hrs 12/20/2004 5.50 DRILL P PROD2 Directional drill from 11656' to 12160', sliding as required to maintain OBb contact as per plan. WOB = 4-5 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3640 psi on Btm, 3410 psi off Btm Torque = 7-8k FtLbs on Btm, 7k FtLbs off Btm P/U 147k 5/0 65k ROT 120k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. I PROD2 Calculated ECD = 10.85 ppg Actual ECD = 11.02 ppg 05:30 - 07:00 1.50 DRILL P Circulate a 20 bbllo-vis sweep followed by a 20 bbl weighted sweep surface to surface. RPM = 80 330 gpm @ 3300 psi. 07:00 - 14:00 7.00 DRILL P PROD2 MU top drive and backream from 12160' to 10050'. Stands 2 & 3 took significant amount of backreaming - pressure increases but no real increase in ECD as if reaming undergauge hole rather than moving cuttings beds. Continue backreaming - became much better above 11300'. RPM = 95 GPM = 330 @ 3000 psi 114:00 - 15:00 Torque = 8-10k FtLbs 1.00 I DRILL P PROD2 CBU at 10050' - 330 gpm & 95 rpm. Circ until shakers cleaned ! i Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12120/2004 14:00 - 15:00 1.00 DRILL P PROD2 up. Pull 3 stds dry - no problems, hole clean. 15:00 - 17:00 2.00 DRILL P PROD2 RIH to bottom. 17:00 - 22:00 5.00 DRILL P PROD2 Circulate BU X 3 to clean and condition hole. RPM = 95 330 gpm @ 3350 psi. Intial ECD = 10.50 ppg Final ECD = 10.26 ppg Calculated ECD = 10.86 ppg SymOps: PJSM. Transfer MOBM from pit module to 400 bbl upright tanks. 22:00 - 22:30 0.50 DRILL P PROD2 PJSM with MI, Veco and all rig personnel on displacing well to SFMOBM. 22:30 - 00:00 1.50 DRILL P PROD2 Displace well to Solids Free MOBM. rate 145 gpm @ 1560 psi 12/21/2004 00:00 - 01 :00 1.00 DRILL P PROD2 Continue displacing well to Solids Free MOBM. rate 145 gpm @ 1560 psi 01 :00 - 01 :30 0.50 DRILL P PROD2 Monitor well - static. Take slow pump rates. Blow down top drive. 01 :30 - 05:00 3.50 DRILL P PROD2 POH from 12160 to the window at 6397'. No problems or tight spots 05:00 - 06:00 1.00 DRILL P PROD2 Service top drive, blocks, crown and drawworks. Change oil in top drive. 06:00 - 07:00 1.00 DRILL N RREP PROD2 Finish changing oil in top drive. 07:00 - 10:00 3.00 DRILL ,P PROD2 POH to BHA 10:00 - 12:30 2.50 DRILL P I PROD2 PJSM. Handle BHA. Remove nuclear source. LD LWD, MWD, motor & bit DSX146H (RR3). 12:30 - 13:00 0.50 DRILL P PROD2 Clear & clean rig floor. 13:00 - 13:45 0.75 CASE P PROD2 RU to run 4.5" slotted liner. 13:45 - 14:00 0.25· CASE P PROD2 PJSM for running liner. 14:00 - 20:00 6.00 CASE P PROD2 Run 4.5" IBT-M slotted liner in OBb lateral per running order. MU 4 jts solid liner, swell packer, 5 jts slotted liner and aluminium billet liner top. Depth in P/U wt S/O wt 1040' 49K 50K 2082' 58K 62K 3115' 70K 72K 4155' 81K 79K 4580' 85K 80K 20:00 - 00:00 4.00 CASE P PROD2 Run 4 1/2" slotted liner in OBb lateral on 4" DP. Depth in P/U wt S/O wt 5553' 97K 90K 6510' 109K 94K 7470' 115K 92K 8430' 122K 91K 12/22/2004 00:00 - 02:30 2.50 I CASE P PROD2 - RIH w/4 1/2" slotted liner on 4" DP to TD @ 12160'. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/22/2004 00:00 - 02:30 2.50 CASE P PROD2 I Depth in P/U wt S/O wt 9387' 130K 82K 9674' 137K 85K 9950' 140K 87K 10230' 147K 93K 10415' 154K 92K 10605' 149K 93K 11080' 160K 87K 11560' 167K 83K 12035' 167K 80K 12160' 172K 81K 02:30 - 03:00 0.50 CASE P PROD2 - Tag bottom @ 12160' wi 5K. P/U off bottom to break over pt I @ 172K & tag bottom w/1 OK. Establish circulation @ 100 GPM 960 psi & pick up string. Up wt 135K - shut down pump & i continue picking up string. String wt indicates off of liner. 03:00 - 07:00 4.00 CASE P PROD2 - POH wI 4" DP & UD aluminum billet running spear. 07:00 - 07:30 0.50 CASE P I PROD2 - Clear & clean rig floor. 07:30 - 08:00 0.50 STKOH P WEXIT - PJSM for P/U BHA. 08:00 - 10:30 . 2.50 STKOH P WEXIT - PIU & M/U BHA - 6 3/4" DSX 146 PDC bit, XP motor wI 1.5 deg bend, bypass sub, NM stab, NM flex lead collar, MWD, PWD, ADN, 2 NM flex DC's, XO, & jars. 10:30 - 14:00 3.50 STKOH P WEXIT - RIH from 209' to 6376' filling every 25 stands. - Shallow test MWD @ 1165' - 330 GPM, 1700 psi. 14:00 - 15:00 1.00 STKOH P WEXIT - PJSM - slip & cut drilling line. 115:00 -18:00 3.00 STKOH P WEXIT - PJSM - R/U & transfer MOBM from upright tanks & displace well from solids free MOBM to MOBM. 330 GPM, 2350 psi, 75 RPM & reciprocating. . - Establish clean hole ECD's at 6376' as follows: GPM RPM Pump Pressure ECD 280 0 1655 9.84 280 60 1655 9.92 330 0 2350 10.02 i 330 60 2350 10.05 I 18:00 - 20:00 I 2.00 STKOH P WEXIT - RIH to 6526' - Wash from 6526' to top of billet @ 7581' DPM. 70 GPM 300 psi 20 RPM. 20:00 - 22:00 2.00 STKOH P WEXIT - Trench from 7574' to 7581' @ 330 GPM 2800 psi. 22:00 - 00:00 2.00 STKOH P WEXIT - Time drill @ 2 FPH for 2' & 4 FPH for 4' to sidetrack off of I billet @ 330 GPM 2800 psi. - Fine granules of aluminum seen @ shakers on B/U. 12/23/2004 00:00 - 02:00 2.00 DRILL P PROD3 - Time drill @ 4 FPH for 4' & 12 FPH for 10'. Sidetrack off of aluminum billet successful. PU above billet and make a pass by the billet - pumps on. OK. - 100% slide @ 330 GPM 2820 psi 02:00 - 12:00 10.00 DRILL P PROD3 - Drill directionally in 6 3/4" hole from 7601' to 8250' backreaming each stand at full drilling rate & reducing pump rate to 75% on downstroke. - WOB 6K, 330 GPM, PP off bottom 2850 psi, on bottom 3150 Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12123/2004 02:00 - 12:00 10.00! DRILL P PROD3 psi, 80 RPM, Tq on bottom 7K, Tq off bottom 6K. . PIU wt 125K, SIO wt 93K, Rot wt 105K. . Calculated ECD 10.36, actual ECD 10.63. 12:00·00:00 12.00 DRILL P AST 2.98 hrs, ART 1.18 hrs, ADT 4.16 hrs. PROD3 - Drill directionally in 6 3/4" hole from 8250' to 9493' backreaming each stand at full drilling rate & reducing pump rate to 75% on downstroke. ! - WOB 5-8K, 330 GPM, PP off bottom 2830 psi, on bottom 3250 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K. - P/U wt 130K, SIO wt 75K, Rot wt 107K. - Calculated ECD 10.65, actual ECD 11.0. 12/24/2004 00:00 - 12:00 12.00 DRILL P - AST 2.43 hrs, ART 2.72 hrs, ADT 5.15 hrs. PROD3 - Drill directionally in 6 3/4" hole from 9493' to 10526' backreaming each stand at full drilling rate and reducing pump rate to 75% on downstroke. - WOB 5-8K, 330 GPM, PP off bottom 3200 psi, on bottom 3500 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K. - P/U wt 145K, SIO wt 77K, Rot wt 115K. - Calculated ECD 10.79, actual ECD 10.96. 12:00 - 00:00 12.00 DRILL P - AST 2.69 hrs, ART 2.36 hrs, ADT 5.05 hrs. PROD3 - Drill directionally in 6 3/4" hole from 10526' to 11437' backreaming each stand at full drilling rate and reducing pump rate to 75% on downstroke. -WOB 5-8K, 330 GPM, PP off bottom 3250 psi, on bottom 3600 psi, 80 RPM, Tq on bottom 9K, Tq off bottom 8K. - P/U wt 154K, SIO wt 65K, Rot wt 115K. - Calculated ECD 10.49, actual ECD 10.76. 12/25/2004 00:00 - 06:30 6.50 DRILL P - AST 2.43 hrs, ART 2.85 hrs, ADT 5.28 hrs. PROD3 - Drill directional in 6 3/4" hole from 11437' to TD @ 12043' MD. Backream each stand at full drilling rate & reduce pump rate to 75% on downstroke. I - WOB 5-8K, PP off bottom 3260 psi, on bottom 3700 psi, 80 RPM, Tq on bottom 10K, off bottom 9K. - P/U wt 165K, SIO wt 60K, Rot wt 115K. - Calculated ECD 10.71, actual ECD 10.89 06:30 - 10:00 3.50 DRILL P - AST 1.12 hrs, ART 2.07 hrs, ADT 3.19 hrs. PROD3 - Circ lo-vis sweep surface to surface. Circ until actual ECD was 10.78 vs 10.74 calculated. PROD3 - Monitor well while blowing down TD. PROD3 - POH for check trip to window. Hole condition v. good - no pump or backreaming required. - Pump out past billet and saw 10k overpulls - stabilizer on ADN. Nothing when bit went across billet. Orient 120L and stop 10:00 - 10:30 10:30 - 17:30 0.50 DRILL P 7.00 DRILL P Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/25/2004 10:30 - 17:30 7.00 DRILL P PROD3 pump. Run in below billet and back up above - no obstructions, no overpulls. - Continue POH to window. 17:30 - 19:00 1.50 DRILL P PROD3 - RIH to 50' above billet - M/U TD & orient 90L. RIH wlo pump I & tag billet @ 7581' wi 5K. P/U above billet, turn on pump, & in ! ! 30L setting. Orient 120L & RIH past billet wI no problem. 119:00 - 21:30 2.50 DRILL P PROD3 - RIH to TD @ 12043' - hole slick. 121 :30 - 23:00 1.50 DRILL P , PROD3 - Pump lo-vis weighted sweep & circ surface to surface @ 330 I GPM 3700 psi, 90 RPM & reciprocating. I - Calculated ECD 10.76, actual ECD 10.8 to 10.85. - Prepare for displacement by reducing surface volume. Pump 100 bbls MOBM into tank farm. Take on SFMOBM into pit 3. 23:00 - 00:00 1.00 DRILL P PROD3 - Displace MOBM wi SFMOBM @ 285 GPM 2650 psi, 90 RPM & reciprocating. 12/26/2004 00:00 - 01 :15 1.25 DRILL P I PROD3 - Displace MOBM wI SFMOBM @ 285 GPM 2650 psi, 90 RPM, & reciprocating. 01: 15 - 01 :30 0.25 I DRILL P PROD3 - BID TD - monitor well - static. 01 :30 - 05:30 4.00 I DRILL P PROD3 - POH to 6000' - hole in excellent shape wI maximum 5K drag. No sign of billet while pulling by wI ADN stab or bit. 05:30 - 06:30 1.00 DRILL P PROD3 - Service TD. - Monitor well. 06:30 - 11 :30 5.00 DRILL P PROD3 - POH to 684'. 11 :30 - 19:00 7.50 DRILL N WAIT PROD3 - Stab TIW valve in string - monitor well wi hole fill pump on I ! while waiting for weather to improve. Phase 3 conditions. - 6.5 bblloss for 7.5 hrs. 19:00 - 19:30 0.50 DRILL P PROD3 - PJSM for handling BHA & source - POH to BHA. 19:30 - 21 :30 2.00 DRILL P PROD3 - UD BHA. 21 :30 - 22:00 0.50 CASE P PROD3 - Clear & clean floor. 22:00 - 22:30 0.50 CASE P PROD3 - Service TD & drawworks. 22:30 - 00:00 1.50 FISH P PROD3 - M/U Whipstock retrieving BHA as follows: Fixed lug retrieval hook, 1 jt 3 1/2" HWDP, bumper sub, oil jars, float sub, MWD, &XO. 12/27/2004 00:00 - 00:30 0.50 STWHIP P PROD3 - Continue M/U whipstock retrieving BHA. 00:30 - 02:00 1.50 STWHIPiP PROD3 - RIH wI 8 stands HWDP. I - Shallow test MWD & BID TD. 02:00 - 03:30 1.50 STWHIPI P PROD3 - RI H wI whipstock retrieval ass'y on 4" DP to 4178'. 03:30 - 04:00 0.50 STWHIP P PROD3 - CBU to condition mud @ 285 GPM 1180 psi. - BID TD. 04:00 - 06:00 2.00 STWHIP P PROD3 - RIH wI 4" DP to -30' above whipstock. Fill pipe & orient hook wi MWD. - P/U wt 130K, 5/0 wt 105K. - RIH to 5' below top of whipstock @ 6402'. Engage slot in I whipstock face - OK. P/U & release whipstock wi 65K over. 1.001 STWHIP P - Monitor well. 06:00 - 07:00 PROD3 - CBU @ 250 GPM 1100 psi. 07:00 - 12:00 5.00 STWHIP P PROD3 - POH wi 4" DP to BHA. 12:00 - 14:00 2.00 STWHIP P , PROD3 - UD BHA. - Clear floor of tools & clean floor. 14:00 - 15:00 1.00 CASE P PROD3 - PJSM - R/U 4 1/2" liner running equip't. 15:00 - 19:00 4.00 CASE P PROD3 Run 4.5" slotted liner to 2484'. 19:00 - 20:00 1.00 CASE N RREP PROD3 Replace casing tongs. 20:00 - 22:30 2.50 CASE P PROD3 Continue running 4.5" slotted liner. 22:30 - 23:30 1.00 CASE N RREP PROD3 Replace cable on laydown machine. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 5-213 5-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12127/2004 23:30 . 00:00 I 0.50 CASE P PROD3 Continue running 4.5" slotted liner to 4000'. 12/28/2004 00:00 - 03:30 3.50 CASE P PROD3 - RIH w/4 1/2" guide shoe jt, 116 jts 41/2" slotted liner & 16 jts 4 1/2" solid liner. · Avg M/U tq 3500 ftllbs. 03:30 . 04:00 0.50 CASE P PROD3 · CIO to 3 1/2" elevators. I - P/U & M/U hook hanger. Total length of liner, hook hanger, & i associated pup jts 5627.99'. I · UD tubing tongs. 04:00 - 11 :30 7.50! CASE P PROD3 - RIH wi 41/2" liner on 4" DP to 11921'. I i' Worked through window on 2nd attempt after picking up I above it & rotating string 1/2 turn. :. Did not see aluminum billet @ 7581'. 111 :30 - 18:30 7.00 CASE P PROD3 · Attempt to hook hanger on window wlo success. Able to run I hook 10' below window, but unable to get beyond 12017'. (TD I @ 12043') 18:30 - 00:00 5.50 CASE N DFAL PROD3 - Monitor well. - POH to 7255' wI 4" DP slowly (3-4 min per stand) to prevent I swabbing due to swell packers. '- Strapping DP while POH. 12/29/2004 00:00 - 01 :00 1.00 CASE N DFAL PROD3 · POH wI 4" DP to hook hanger. - 1.84' difference in tally & SLM. 01 :00· 03:30 2.50 \ CASE N DFAL PROD3 - C/O elevators & PIU hook hanger & inspect. No damage to hook or hanger. R/U casing tongs & UD hook hanger & ball catcher assy. - UD 1 jt 4 1/2" slotted liner. I - MIU hook hanger & ball catcher assy. - UD casing tongs. 03:30 - 11 :00 7.50 CASE N DFAL PROD3 - RIH wI hook hanger on 4" DP to 7013' · Tag up on liner tie back @ 6465" - P/U above TOW & rotate string 1/2 turn. Made it through window on 2nd attempt. - RIH to 11,900' 11 :00· 14:00 3.00 CASE N DFAL PROD3 1- String Wt. down 75-50k, up 170k - Attempted to set hook wlo success. Able to work hook 10' outside window, could not get below 11,976'. Decided to POOH 6.50 I CASE and dress window. 14:00 - 20:30 N DFAL PROD3 - POH with 4" DP to hanger. 20:30· 21 :30 1.00 CASE N DFAL PROD3 i-Change elevators 3 1/2" · UD hanger - Change elevators to 4 1/2" 21 :30· 00:00 2.50 CASE ,N DFAL PROD3 - PJSM - discussed risks associated with laying down liner I · POH UD 16 jts 41/2" solid liner, 8 jts 41/2" slotted liner 1 x 1. - UD 2 swell packers. Original OD 6.4" - currently 6.53" 12/30/2004 00:00 - 07:30 I 7.50 CASE N DFAL PROD3 - POOH wi 4 1/2" slotted liner. · Total jts. UD, 115 slotted, 16 solid, 1 shoe jt, 2 swell packers and 1 hook hanger. 07:30 - 08:30 1.00/ CASE N DFAL PROD3 - Monitor well - RID TBG equipment i - Clear/clean rig floor 08:30 - 09:00 0.50 BOPSUP P PROD3 - PJSM - Pulled wear bushing - Set test pi ug Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12130/2004 08:30 - 09:00 0.50 BOPSUF P PROD3 109:00 - 13:30 4.50 I BOPSUP P PROD3 I 13:30 - 14:30 1.00 BOPSUP P PROD3 14:30 - 15:00 0.50 CASE N DFAL PROD3 15:00 - 17:30 2.50 CASE N DFAL PROD3 17:30 - 20:00 2.50 CASE N DFAL PROD3 I 20:00 - 23:00 3.00 I CASE N DFAL I PROD3 23:00 - 00:00 1.00' CASE N DFAL PROD3 12/31/2004 00:00 - 05:00 5.00 CASE N 05:00 - 07:00 2.00 CASE N 07:00 - 11 :00 4.00, CASE N 11 :00 - 12:00 1.00 CASE N 12:00 - 12:30 0.50 CASE N 12:30 - 13:30 1.00 CASE N 13:30 - 17:00 3.50 CASE N 17:00 - 21 :00 4.00 CASE N · R/U test equipment - Test BOPE's - 3,500 psi. highl 250 psi. lowl 5 min. · Witness of test wavied by John Chrisp (AOGCC) ,- Pull test plug - Install wear bushing · Blow dn. test lines - RID test equipment - Cut apart bent shoe jt. & slotted jt. wI Wachs cutter - Clean out under rotary table (dried excess drilling fluid) - CIO air boot - PJSM - Build window polish mill assy. (2 ea. string mills @ 6 3/4" OD) - Test MWD before proceeding in hole - RIH wi 4" DP to 6300' (63 stds DP) - Fill DP ever¡ 2000' - Orient bent jt. I MWD to 15 deg. left of HS and RIH to 6388' - P/U std # 64 & reorient and attempt to slide out window (TOW @ 6397' & BOW @ 6409'). Bottomed out in tie back sleeve @ 6461'. No success after repeated attempts. DFAL PROD3 - Attempt to exit window wi polish mill assy. (circ. & non-circ.) - Positionlorient string @ 90 deg. increments & attempt exit - Rotate @ 6393' @ 10 rpm w/steady 3500 ftllbs torque. Repeat @ 6405' (middle of window) with same results. - Rotate fl 6390' to 6420' @ 5 rpm wI 3000 ftllbs steady torque, (rotary limit set @ 3500 ftllbs.). Attempting to stall drill string @ window. No success - Position/orient string @ 45 deg. increments & attempt exit - POH to 6358' (UD 1 jt.), orient to 9 deg. left of HS. RIH & P/U 1 jt. and bottom out in tie-back sleeve @ 6461'. · Same as above but @ 14 deg. left of HS, no success. DFAL PROD3 DFAL I PROD3 DFAL PROD3 DFAL PROD3 DFAL PROD3 DFAL PROD3 DFAL PROD3 - PJSM · Slip & cut drilling line. - POH w/4" DP - Pooh w/BHA, BIO & UD same - Clear & clean rig floor - PJSM - Strap and MIU BHA - RIH wI polish mill assy. #2 on 4" Dp to 6310' · String Wt. Up 130K, Dn 100K - Orient bent jt. wi MWD - Pump Rate 80 spm @ 1340 psi. - During orienting process tagged btm of window @ 6409'. Unable to exit window after final orientation of bent jt./ MWD - Repeated attempts made wI different tool orientations WIO success · While roating Dn @ 5 rpm, wi 5,000 ft./lbs torque and running speed of 30 fpm tagged Btm of window @ 6409', string torqued up and stalled. Unable to pull free with up wt. of 130K. Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12131/2004 17:00 - 21 :00 4.00 CASE N DFAL PROD3 Released torque and applied 2 rds. to the left in 1/2 turn and worked torque Dn. Gradually increasing pick up wt. by 5,000 lb. increments. String pulled free @ 160K, proceeded to RIH and tag tie-back. - Repeated rotating Dn process same as before and tagged again. Continued to apply Rt. hand torque to 7,000 ft./lbs and increase bit wt. to 35K. String broke free and proceeded to RIH to 6465' to confirm string outside window. 21 :00 - 22:00 1.00 CASE N DFAL PROD3 - RIH to 6740' (bull nose depth), confirmed mills pass through window before prior start of dressing process. - Dress window w/20,25 & 30 rpm, 350 gpm pump w/1600 psi. - Work mills f/6390' t/6415' to dress window. - Work mills f/6415 t/ 6455' to dress open hole. - After dressing Up Wt. 125K, Dn Wt. 1 OOK W 10 rotating or circulating. - No abnormal Up Wt. or Dn. Wt. after dressing - 22:30 0.50 CASE N DFAL PROD3 - POH t/6350' - 23:30 1.00 CASE N DFAL PROD3 - Circ B/U @ 300 GPM 1350 psi. - Monitor well - 00:00 0.50 CASE ,N DFAL PROD3 - POH w/ mills 1/1/2005 00:00 - 03:30 3.50 CASE N DFAL PROD3 - POH w/polish mill assy. to BHA 03:30 - 05:30 2.00 CASE N DFAL PROD3 ' -UD BHA 05:30 - 06:00 0.50 CASE N DFAL PROD3 - Clear floor of excess BHA tools - Clean floor 06:00 - 07:30 1.50 CASE N DFAL PROD3 - PJSM IDFAL - R/U Tbg. handling equip. to RIH w/4 1/2" slotted liner - 16:00 8.50 CASE N PROD3 - M/U & RIH with 4 1/2" liner. I I - Avg. make up torque 3600 ft./lbs. I - 1 solid shoe jt., 116 jts. 4 1/2" slotted liner, 16 jts. 4 1/2" solid liner, 2 swell pkr. assy. 16:00 - 16:30 0.50 i CASE N DFAL PROD3 - C/O elevators I - M/U 7 5/8" x 41/2" Hook hgr. I - String wt. Up 97K I - String wt. Dn 87K 16:30 - 17:00 0.50 I CASE N DFAL PROD3 - RID Tbg. handling equip. - R/U to RIH wi 4" DP 17:00 - 17:30 I 0.50 I CASE N DFAL PROD3 - RIH wI slotted liner on 4" DP to 6461' (Tagged up on tie-back) I 17:30 - 19:00 I 1.50 CASE N DFAL PROD3 - UD 2 jts. DP and P/U Std. # 10 of 4" DP (needed full std. to orient and exit window, allowing tag up on tie-back if needed) - Orient 1/4 turn to right and attempt exit window (no success) I PROD3 - Add another 3/4 turn (1 turn total) and exit window - P/U 2 jts. DP (same ones that were UD) and continue to RIH 19:00 - 23:30 4.50 CASE N DFAL - RIH wi slotted liner on 4" DP - Tagged Billet in OBd lateral @ 7581' (rotate 1/2 turn to right and work by same, no problem) i 23:30 - 00:00 0.50 CASE N DFAL PROD3 - Liner stopped @ 11215', Up Wt. 175K, Dn Wt. 75K - Reciprocate f/11,180' t/ 11215' - Rotate 1 turn rt. & work torque dn. - Add 1 more tum rt. & work pipe - Add 3 more turns & work pipe until all torque gone. No success Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/1/2005 23:30 - 00:00 0.50 CASE N IDFAL PROD3 1/2/2005 00:00 - 00:30 0.50 CASE N DFAL PROD3 - UD 1 jt. (for longer stroke when reciprocating) - Rotate 1 turn rt. and reciprocate pipe and using drawworks braking action to work through tight spot @ 11215' 00:30 - 01 :30 1.00 CASE N DFAL PROD3 - RIH wi liner on 4" DP tJ 11,971'. ,- Up Wt. 167K 101 :30 - 03:00 - Dn Wt. 60K 1.50 I CASE N DFAL PROD3 - POH tJ 11,965' (hook hgr. @ 6392') i - Apply 1 1/2 turns rt, unhook hanger and work pipe dn. to 11,980' - POH tJ 11,955' - Apply 3/4 turn rt. and work torque dn & attempt to hang hook hanger wlo success.. - Apply 1/2 turn and work torque dn. and hang off hgr. - P/U 10' and unseat hgr. and rehang same. (0215 hrs) - Drop 1 3/4" ball and chase w/30 spm @ 300 psi to seat same - Pressure up to 3,000 psi and release from liner - P/U and verify running tool released from liner - P/U Wt. 138K - S/O Wt. 112K - POH tJ 6360' 03:00 - 03:30 0.50 CASE P PROD3 - CBU @ 66 spm @ 1750 psi (2300 calc. stks) 03:30 - 04:30 1.00 CASE P PROD3 - RIH and tag top of Hook Hgr. @ 6392' - Blow Dn Top Drive - Monitor well 04:30 - 07:30 3.00 CASE ¡p PROD3 - POH wI 4" DP 07:30 - 08:00 0.50 CASE P PROD3 - B/O & UD liner running tool I 08:00 - 09:00 1.00 CASE ¡P PROD3 - Clean & clear rig floor 09:00 - 09:30 0.50 CASE P PROD3 - PJSM - R/U to RIH wI LEM #1 & inner string 09:30 - 12:30 3.00 CASE P PROD3 - M/U LEM #1 Assy.; Seal Assy.-3 x 41/2" pup jts.; Window Assy.- 4 1/2" pup jt., Casing Swivel, Seal Bore Ext. (inner string- 2 x 2 7/8" tbg. jts., 2 x 2 7/8" pup jts., Seal,s & Nozzle Assy.), ZXP Pkr. wi Tie-Back Assy. 12:30 - 19:00 6.50 CASE P PROD3 - RIH wi LEM #1 on 4" DP to 6390' (top of hook hgr. @ 6392'). I - Running speed as per Baker Rep. was 30' prl min. - Up Wt. 135K - Dn Wt. 112K 19:00 - 20:00 1.00 CASE P PROD3 -Tagged Hook Hgr. top @ 6392' - Apply 1 1/2 turns to right & RIH tJ 6462' - Up Wt. 137K - Dn Wt. 11 OK - Continue tJ RIH & tag @ 6481' - Apply 1 1/2 turns & RIH, wlo success - Brk circ. @ 3 bpm @ 490 psi & circ. dn tJ 6490' (mule shoe depth). - LEM locator tagged up in Hook Hgr. Collet Profile @ 6392' - P/U 10' & 8/0 to verify LEM engaged wi 20,000# on Pkr. 20:00 - 22:00 2.00 CASE P PROD3 - Brk. TD connection & drop 1 3/4" pkr. setting ball - Circ. Ball Dn. @ 2 bpm @ 430psi. (bumped ball with 537 stks) Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/2/2005 20:00 - 22:00 2.00 CASE P PROD3 - P/U V 2800 psi. to set ZXP Pkr. (hold 5 min), bleed off pressure - Close upper pipe rams to test ZXP Pkr. x 7 5/8" csg. tJ 1500 psi., Unable to pressure up (pumped 9 bbls 1104 stks. to 700 psi.), bleed off excess pressure. Suspect Pkr. not fully set. - Open Rams - Pressure up DPI Pkr. V 4000 psi. to reset Pkr. (observed string wt. fluctuation of app. 10/15000 Ibs), hold 5 min. & bleed off pressure. Also released running tool during this process. '- Close top rams & retest Pkr x 7 5/8" csg. wI 1500 psi., successful - Pick up 20' (out of pkr.) & rotate dn @ 25 rpm to verify Pkr. set. Tag LEM tie-back @ 6335', Pkr set @ 6346' - POH wI circ. sub V 6332' 22:00 - 23:00 1.00 CASE P PROD3 - Circ. S/U 6332' (reciprocating Dp) @ 6 bpm @ 1100 psi. (calc. stks 2400) I - Blow Dn. TD I 123:00 - 00:00 1.00 CASE 'P PROD3 - POH wI LEM running tool on 4" DP 1/3/2005 00:00 - 02:30 2.50 CASE P PROD3 - POH wI LEM running tool on 4" Dp 02:30 - 03:00 0.50 CASE P PROD3 - R/U 2 7/8" handling tools & equip. to UD inner string 03:00 - 03:30 0.50 CASE P PROD3 - S/O & UD LEM Running Tool 03:30 - 04:30 1.00 CASE P PROD3 - UD 2 7/8" Inner string 04:30 - 05:00 0.50 CASE P PROD3 - RID 2 7/8" handling tools & equip. 05:00 - 06:00 1.00 CASE P PROD3 - Clear & Clean rig floor 06:00 - 09:30 3.50 P WEXIT - PJSM - M/U Whipstock BHA fl OBa lateral (SHA length=1437.90') - Orient MWD V Whipstock - Shallow test MWD wi 200 gpm, Tool Pulse 360/460 psi. ,- SHA to Top of Slide------1196.74' 51 stds 4" Dp + 25.47'---4908.10' Depth to Top of Slide-----61 07.87' 09:30 - 14:00 4.50 STWHIP' P WEXIT - RIH wI Whipstock BHA on 4" Dp tJ 6323' - Run speed 90'1 min. - String Wt. Up 145K, Dn 110K 14:00 - 14:30 0.50 STWHIP P WEXIT - Engaged Pump, 300 gpm @ 1980 psi. I - Reciprocate Dp & Orient Whipstock to 14 deg. Left (obtained 4 good tool faces) ,- RIH & set Whipstock Anchor, Top of Whipstock Slide @ 6108' - P/U to 15K overpull to verify Whipstock set - S/O and stacked 42K & Sheared Mills free 14:30 - 16:30 2.00 STWHIP P WEXIT - PJSM - Displace Well bore fluid tJ MOSM - 260 bbls @ 300 gpm @ 1980 psi - Circulated 2 X B/U to condition mud 16:30 - 21 :30 5.00 STWHIP P WEXIT - Mill Window f/6108' V 6120' (TD @ 6138') - WOM 2-3K, RPM 75-100 - Torque 8,000-9,000 tv Ibs - Pump 320 gpm @ 1800 psi - String Wt. Up 145K, Dn 107K Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/3/2005 16:30 - 21 :30 5.00 STWHIP P WEXIT - Retrieving Slot @ 6113' @ 14 deg. Left 21 :30 - 22:30 1.001 STWHIP P WEXIT - Circ. Sweep S/S (Sweep = 40 bbl MOBM + 55 gal. dm HRP) - Pump 320 gpm @ 1800 psi. - Ream & back ream window while sweep going around BHA - RIH through window dry before POH-no problem - Monitor Well -Static 22:30 - 23:00 0.50 STWHIP P WEXIT - POH II 5600' 23:00 - 00:00 1.00 STWHIP P WEXIT - PJSM - Slip and Cut Drlg Line 1/4/2005 00:00 - 02:00 2.00 STWHIP P WEXIT - PJSM , - Slip & Cut 473' bad Drlg Line 02:00 - 04:00 2.001 STWHIP P WEXIT - POH wI Whipstock Mill Assy. 04:00 - 06:30 2.501 STWHIP P WEXIT - B/O & UD Baker Milling Tools 1.50 I STWHIP P - Stand back collars and HWDP 06:30 - 08:00 WEXIT - Clear rig floor of BHA components . - Clear rig floor & under rotary table 08:00 - 08:30 0.50 STWHIP P WEXIT 1- Rig Service 08:30 - 12:30 4.00 STWHIP N RREP WEXIT - Repair Top Drive 12:30 - 13:30 1.00 STWHIP P WEXIT - M/U Stack Washer - Functioned BOPE stack & washed to remove metal cuttings - Flushed Choke, Kill & Flow lines - Blow Dn. TD, Kill & Choke lines 13:30 - 16:00 2.50 STWHIP P WEXIT - PJSM I - P/U & M/U 6 3/4" Driectional Drlg. Assy. I - Cleared rig floor, installed Radioactive sources i - Continue to build BHA 16:00 - 19:30 3.50 STWHIP P WEXIT - RIH wI BHA on 4" Dp - Shallow pulse test MWD 1.001 STWHIP P - Continue RIH II 6050' 19:30 - 20:30 WEXIT - Establish circulation & Drilg. parameters - String Wt. Rot. 11 OK - Up Wt. 120K, Dn Wt. 105K ,- ECD 10.0 ppg (calculated) - Pump 330 gpm @ 2300 psi - Set Tool Face 14 deg. left - Slide through window (6108'-6120') wlo pump II 6130' - Circ Dn. fl 6130' II 6138' 20:30 - 00:00 3.50 DRILL P PROD4 - Drlg. f/6138' 116340' (rotating & sliding) i - WOB Sliding 3/4K 1- Wob Rot. 5K - Rpm 60 - Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftllbs - Pump Rate 330 gpm - Pressure-Off Btm 2300 psi, On Btm 2400 psi - Calc. ECD 10.0, Act ECD. 10.2 1/5/2005 00:00 - 02:30 2.50, DRILL P PROD4 - Drlg. fl 6340' II 6528' (rotating & sliding) - WOB Sliding 3/4K - WOB Rot. 5K ,- Rpm 60 - Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftllbs - Pump Rate 330 gpm - Pressure-Off Btm 2300 psi, On Btm 2400 psi - Calc. ECD 10.0, Act ECD. 10.2 Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/5/2005 02:30 - 03:00 0.50 DRILL P PROD4 - Circulate, as per Geolgist (waiting on MWD logs) - Pump Hi-Vis Sweep (40 bbl MOGM + 55 gal HRP) - Pump Rate 330 gpm @ 2250 psi. - Reciprocating, oriented high-side PROD4 - Drlg. fl 6528' tJ 7292' (rotating & sliding) 1- WOB Sliding 3/4K - WOB Rot. 7/8K - Rpm 80 - Torque- Off btm 5,000 ftJlbs, On Btm 6,000 ftJlbs - Pump Rate 330 gpm - Pressure-Off Btm 2400 psi, On Btm 2600 psi - Calc. ECD 10.18, Act ECD. 10.4 - Strg. Wt. Up 122K, DN 93K, Rot. Wt 108K 03:00 - 12:00 9.00 I DRILL P 12:00 - 00:00 12.00 DRILL P PROD4 - Drlg. f/7292' tJ 8444' (rotating & sliding) - WOB Sliding 2K - WOB Rot. 3/4K - Rpm 80 - Torque- Off btm 7,000 ftJlbs, On Btm 9,000 ftJlbs - Pump Rate 330 gpm - Pressure-Off Btm 2610 psi, On Btm 2760 psi - Calc. ECD 10.4, Act ECD. 10.5 - Strg. Wt. Up 125K, DN 88K, Rot. Wt 109K PROD4 - Drlg. f/8444' tJ 9310' (rotating & sliding) - WOB Sliding 4K - WOB Rot. 5K - RPM 80 - Torq. On 8tm. 7K, Off Btm. 6K - Pump Rate 330 gpml 92 spm - Pump Press. Off Btm. 3100 psi, On Btm 3300psi - Strg. WI. Up 127K, Dn 98K, Rot. 105K - Calc. ECD. 10.47, Act ECD. 10.39 - SPR #1 30 spm=590 psi 40 spm= 780 psi - SPR #2 30 spm=700 psi 40 spm=880 psi - ART =6.71 hrs. AST =1.29 hrs. 1/6/2005 00:00 - 12:00 12.00 DRILL P 12:00 - 00:00 12.00 DRILL P PROD4 - Drlg. f/9310' tJ 10,433' (rotating & sliding) - WOB Sliding 5/22K - WOB Rot. 4K - RPM 80 - Torq. On Btm. 8K, Off Btm. 6K - Pump Rate 330 gpml 92 spm - Pump Press. Off Btm. 3,000 psi., On Btm. 3100 psi. - Strg. Wt. Up 139K, Dn.94K, Rot. 113K Pnnted: 21712005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/6/2005 12:00 - 00:00 12.00 DRILL P PROD4 - Calc. ECD 10.25, Act ECD 10.27 - ART =3.51 hrs., AST =2.82 hrs. 1/7/2005 00:00 - 10:30 10.50 DRILL P PROD4 -Drlg. f/1 0,433' t/11,006' (rotating & sliding) - WOB; Sliding 22/25K, Rot 5K - RPM 80 - Torq. Off Btm. 6K, On Btm 8K - Pump Rate 330 gpml 92 stks - SSP; On Btm 3150 psi., Off Btm 3000 psi - Strg. Wt., Up 139K, Dn. 94K, Rot 113K - ECD; Calc. 10.39, Act 10.43 - SPR #1 30 spm=680 psi. I 40 spm=850 psi. - SPR #2 30 spm=680 psi. 40 spm=880 psi. - Observed intermittent high torque causing rotary to stall ( torque limiter set at 12,000 ftJlbs). Decision was made to back ream through inverted section of low permeability zone fl 10,150' t/10,900' 10:30 - 14:30 4.00 DRILL P PROD4 - Backream f/11,006' t/9,950' Through inverted low permeability section. - RPM 80, Torque 7-9K - Pump rate; 330 gpm @ 2950 psi. - String stalled out @ 15,000 ftJlbs torque @ following depths; -10,900'-10850',10,725'-10,700',10,600'-10,575', 10,488'-10,450' I 10,358'-10,298',10,164'-10,138',10.094'-10,044' - RIH t/11,006' 14:30 - 16:00 1.50 DRILL P PROD4 - Reciprocate & rotate @ 11,006' while circulating - Pump & circ. 40 bbl. weighted sweep SIS - Pump rate 330 gpm @ 2850 psi. I - RPM 80 16:00 - 18:30 2.50' DRILL P PROD4 - Drlg 1/11,006' t/11,197' (rotating & sliding) - WOB; Sliding 25K, Rot. 4K - RPM 80 - Torque; On Btm. 8/10K, Off Btm. 7K - Pump; 330 gpm/92 stks. - SSP; On Btm 3130 psi., Off Btm 2980 psi. - Strg Wt.; Up 140K, Dn. 87K, Rot. 115K - ECD; Calc. 10.53, Act. 10.54 - Rotary on TD failed (unable to rotate at all). Continue to circ. and reciprocate pipe while preparing to trouble shoot rotary failure 18:30 - 21 :00 2.50 DRILL N RREP PROD4 - Trouble shoot TD rotary failure (reciprocating and circulating during this process). - Pump; 330 gpm @ 2960 psi. - Strg Wt.; Up 143K, Dn.90K - Suspect rotary rheostat-replace same 21 :00 - 00:00 3.00 DRILL P PROD4 - Drlg f/11.006' t/11,390' (rotating & sliding) Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/7/2005 21 :00 - 00:00 3.00 DRILL P PROD4 - WOB; Sliding 2SK, Rot. 3K - RPM 80 - Torque; On Btm. 7K, Off Btm. 6K , - Pump; 330 gpml 92 stks. - SSP; On Btm 3200 psi., Off Btm. 3000psi. - Strg Wt.; Up 142K, Dn. 80K, Rot. 115K - ECD; Calc. 10.76 Act. 10.79 1/8/2005 00:00 - 07:00 7.00 DRILL P PROD4 - Drlg. f/11 ,390' tJ 12,100' (rotating & sliding) - WOB; Sliding 4K Rot. 5K - RPM 80 - Torque; On Btm. 7,500 ftJlbs, Off Btm. 7,000 ftJlbs. - Pump Rate 330 gpml 92 spm - SSP; On Btm. 3,280 psi. Off Btm. 3,150 psi. - Strg. Wt.; Up 150K, Dn.75K, Rot. 114K - ECD; Calc. 10.68 Act. 10.85 - SPR #1 30 spm=720 psi. 40 spm=900 psi. - SPR #2 30 spm=800 psi. 40 spm=900 psi. 07:00 - 09:00 2.00 I DRILL P PROD4 - Circ. Btms. Up x 2, until shaker returns were clean. - Pump Rate; 330 gpm @ 3,200 psi. 09:00 - 14:00 5.00 I DRILL P PROD4 - Wiper Trip f/12, 1 00' tJ 6,040' - Tight Spot @ 10,596', 20K overpull, wrk'd BHA through area, no overpull after working area. 14:00 - 16:30 2.50 DRILL P PROD4 - Circ. Btms. Up x 2 @ 6,040' - Pump Rate 330 gpm @ 2,250 psi. 16:30 - 00:00 7.50 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather - Pump Rate 90 gpm @ 340 psi. - Strg. Wt.; Up 115K, Dn. 105K, Rot. 111 K - Reciprocating & Rotating Drill string periodically 1/9/2005 00:00 - 00:00 24.00 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather - Pump Rate; 90 gpm @ 340 psi. - Strg. Wt.; Up 115K, Dn.105K, Rot. 111 K - Reciprocating & Rotating periodically 1/10/2005 00:00 - 00:00 24.00 DRILL N WAIT PROD4 - Circ. @ 6,040', Phase 3, Wait On Weather - Pump Rate; 90 pgm @ 340 psi. - Strg. Wt.; Up 115K, Dn. 105, Rot. 11 K - Reciprocating & Rotating Dp pèriodically 1/11/2005 00:00 - 06:00 6.00 DRILL N WAIT PROD4 - Circ @ 6,040', Phase 3, Wait On Weather - Pump Rate; 90 gpm @ 340 psi - Strg. Wt.; Up 115K, Dn.10SK, Rot. 11K - Reciprocate & Rotate periodically 06:00 - 18:00 12.00 DRILL N WAIT PROD4 - Phase 3 lifted to Phase 2 - Continue to Circ. @ 6,040' - Mobilize equipment to clean pad & dig out all vac. trucks. 2 forklifts, 1 cat & service vehicles to start dead trucks - Send Vac. trucks wI SFMOBM back to M-I plant for reheating wI additions of new mud. 18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Circ. @ 6,040', 90 gpm 1340 psi. - Clear and clean around rig & pad wi heavy equipment Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/11/2005 18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Clear all exits, walkways, stairs & steps of excess snow & ice 1/12/2005 00:00 - 00:30 0.50 DRILL P PROD4 - B/O TD & Blow Dn same. Change out first jt. (galled face on tool jt) 00:30 - 02:30 2.00. DRILL P PROD4 - RIH wI 4" Dp & 6 3/4" Directional BHA tJ 9,293' - Dn. Wt. 75K 02:30 - 03:30 1.00 DRILL P PROD4 - M/U TD, Fill Dp & Brk. Circ. (stage up pumps in 30 stk. increments) - Final Pump Rate; 325 gpm @ 2,760 psi. - ECD Calc. 10.35, Act. 10.56 - B/O TD & Blow Dn. same 03:30 - 04:30 1.00 DRILL P PROD4 - RIH wi 4" Dp & 6 3/4" BHA tJ 12,100' 04:30 - 08:00 3.50 DRILL P PROD4 - M/U TD & Brk Circ. - Pump Rate; ICP 330 gpm I 3,550 psi., FCP 330 gpm I 3,400 psi - RPM 100 - Torque 8,000 ftJlbs - Strg. Wt. Up 112K, Dn. 102K, Rot 108K - ECD Calc. 10.80, Final Act. 10.89 - Pump 20 bbl. Low-Vis sweep followed by 20 bbl. Weighted sweep 08:00 - 10:30 2.50 DRILL P PROD4 - PJSM - Disp. Wellbore to SFMOBM @ 6 bpm I 2,370 psi. 10:30 - 13:00 , 2.50 DRILL IP PROD4 - Circ. tJ condition & balance mud in wellbore - Pump Rate; 330 gpm 13,750 psi. 13:00 - 22:00 9.00 DRILL P PROD4 - PJSM - POH wI 4" Dp, UD jts. wI bad hard band (Dp & HWDP) - No significant overpull at window (6,120'-6,108') - 84 jts 4" Dp & 8 jts. HWDP UD 22:00 - 00:00 2.00 DRILL P PROD4 - POH w/6 3/4" Directional BHA - PJSM wI Schlumberger before POH wI Radioactive Source - Clear floor of unnecessary personnel & remove source i I 1/13/2005 00:00 - 01 :00 1.00 DRILL P PROD4 - UD 6 3/4" Directional BHA 01 :00 - 02:00 1.00 CASE P PROD4 - Clear & Clean Rig Floor 02:00 - 02:30 0.50 CASE P PROD4 - Service Top Drive 02:30 - 05:00 2.50 CASE P PROD4 - P/U & M/U Whipstock Retrieving BHA - Retrieval Hook, 1 jt. HWDP, Float Sub, MWD, Bumper Sub, Oil Jar, XO, 24 jts. HWDP= 832.55' - Shallow Test MWD @ 830' - Pump Rate; 330 gpm 11000 psi. OK 05:00 - 08:00 3.00 CASE P PROD4 ,- RIH wI 4" Dp & Whipstock Retrieval BHA tl5,700' - SLM Dp in derrick while RIH - Fill Dp @ 3,200' Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/13/2005 08:00 - 09:30 1.50 CASE P PROD4 - PJSM - Slip & Cut Drlg. Line 09:30 - 11 :00 1.50 CASE P PROD4 - RIH 116,090' wI Whpstck Ret'r BHA on 4" Dp - Pump Rate; 250 gpm/1230 psi. 1- Strg. Wt; Up 130K, Dn. 102K 1- Orient'd Ret'r Hook, RIH 116113' & latched Whpstck. .. Pulled 30,000# Overpull & let Jars bleed off - Pull to 85,000# Overpull & released Anchor · POH 45' to 6,075' 11 :00 - 11 :30 0.50 CASE P PROD4 - CBU @ 330 gpm/1 ,950 psi · Pump Off- Monitor Well- Static · B/O & BID Top Drive 11 :30· 14:30 3.00 CASE P PROD4 - POH wI 4" DP 14:30 - 17:00 2.50 CASE P PROD4 - B/O & UD Whpstck Retrieving BHA & Whipstock - Whipstock showed mills came off @ 9 1/2' , rode high side fl 1 1/2' 17:00 - 17:30 0.50 CASE P PROD4 - Clear & Clean Rig Floor 17:30 - 23:00 5.50 CASE P PROD4 - PJSM - Remove Wear Ring, Install Test Plug & R/U II test · Test BOPE's 11250 psi low/3,500 psi high - Test witnessed by AOGCC rep. · RID Test Equip., Remove Test Plug & Install Wear Ring 23:00 - 00:00 1.00 P RUNPRD - PJSM - R/U Liner running equip. & handling tools 1/14/2005 00:00 - 06:30 6.50 CASE P RUNPRD - Liner Running Procedure reviewed in PTSM - RIH wI 141 jts. 4 1/2" 12.6 # L-80 IBT Slotted Liner, 1 jl. 4 1/2" 12.6 # L-80 IBT Solid Liner (Bent) Shoe Jt. wI Guide Shoe, 1 jt. 4 1/2" 12.6# L-80 IBT Solid Liner under Hgr. - Torque to preset make, Avg. M/U Torque 3,450 ftIlbs. 06:30 - 07:30 1.00 CASE P RUNPRD - C/O Elevators - M/U Hook Hgr, P/U 1 std. Dp & M/U Top Drive - Circ. 10 bbls through Hgr. @ 330 gpm 1275 psi. - BIO TD & Blow Dn. Same - Strg Wt. Up 100K, Dn.90K 07:30 - 17:30 10.00 CASE P RUNPRD - RIH w/4 1/2" Liner on 4" Dp - Worked Centrilizers through window, Centrilizers hung up @ 7,800', 8,470', 8,780' - Encountered difficulty RIH wI Liner, (corresponding Shoe Depth 10,300'). Beginning of Inverted section on Low Permability Zone of OBa @ 10,290'. - @ 11,604' began P/U single jts. Dp (1 x 1) & RIH, (giving more flexability to work string). Continue to work pipe Dn. II 12,082' - Did not latch HGR. Hook going through window @ 6,120' - Strg Wt. Up 190K, Dn. 40K 17:30 - 18:30 1.00 CASE P RUNPRD - Reciprocate pipe f/12,065' 1112,082', (free up liner string prior to attempting to hook Hgr). - Final Strg. Wt. Up 180K, Dn.40K - M/U TD & apply 1/4 turn to right. Work pipe & SIO to latch Hgr. Hook @ 6,120'-successful - P/U II 190K & brk. string free, unlatch Hgr. Hook - SIO & relatch Hgr. Hook @ same mark, depth 6,120'. - BIO TD & drop 1 3/4" Baker ball. MIU TD Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/14/2005 17:30 - 18:30 1.00 CASE P RUNPRD - Circ Ball Dn. @ 4 bpm/530 psi., reduce rate II 2 bpm last 10 bbls. Total string vol. to ball seat = 55 bbls. - Seat ball & pressure up II 3,000 psi. (hold 5 min.) - Bleed off pressure II 0 psi. - P/U 30' to app. 6,090' to verify Running Tool released. Continue to POH II 6,030' 18:30 - 19:30 1.00 CASE P RUNPRD i - CBU @ 6,030' - Pump Rate; 355 gpm I 3,300 psi. - Strg. Wt. Up 125K, Dn. 108K - B/O TD & BID same 19:30 - 22:00 2.50 CASE P RUNPRD - POH wI 4" Dp & Liner Running Tool 122:00 - 22:30 0.50 CASE P RUNPRD - UD 4 1/2" Liner Running Tool - Make all service brks. as per Baker Rep. 22:30 - 23:00 0.50 CASE P RUNPRD - Clear & Clean Rig Floor 23:00 - 23:30 0.50 TIEBAC P OTHCMP - PJSM 123:30 - 00:00 CONDH~P - R/U Liner Running Equip. & Handling Tools fl LEM # 2 0.50 OTHCMP - RIH wI LEM Assy. # 2 , - 41/2" Seal Assy. 1 jt. 4 1/2" 12.6 # L-80 IBT Solid Liner 1/15/2005 i 00:00 - 01 :00 1.00 TIEBAC i P OTHCMP - RIH wi LEM Assy. #2 I - P/U 3 ea. 4 1/2" 12.6# L-80 IBT Solid Liner jts., 3 ea. 4 1/2" I 12.6# L-80 IBT Solid Liner Pup jts., 1 ea. Baker LEM Hgr., 1 I I 101:00 - 01:30 ea. Baker Seal Bore Assy. 0.50 TIEBAC P 10THCMP 1- PJSM ,- CIO Elevators - Install False Bowl & R/U 2 7/8" handling tools 01 :30 - 02:00 0.50, TIEBAC P OTHCMP - Service Top Drive 02:00 - 05:00 3.00 TIEBAC P OTHCMP - P/U & RIH wi Circ. Nozzle Assy., 9 jts. 2 7/8" 7.7# Inner Wash String & 2 718" Pack-Off Assy. - Total Length = 281.11' - CIO Elevators - P/U & M/U Baker 5 1/2" x 75/8" ZXP L TP 05:00 - 05:30 0.50 TIEBAC P OTHCMP - RID 2 7/8" Handling Tools 05:30 - 12:30 7.00 TIEBAC P OTHCMP - PJSM - RI H wi LEM #2 on 4" DP II 6,103' (top of Liner Hook Hgr) 12:30 - 15:00 2.501 TIEBAC P OTHCMP - MIU TD & Brk Circ. @ 3 bpml 570 psi. - Strg. Wt. Up 132K. Dn 111K - Attempted to run LEM Assy. through Hgr. LEM window, wlo success, stacked out @ 6,122'. - P/U 20', turned string in increments of 1; 1/2; 1/4; 1/8 turns attempting to RIH, wlo success, string stacked out @ 6,122'. Continued to attempt to run through LEM window with & without pumps wlo success. Rotate string @ 5 rpm (strg. torque 4K Wlbs) while slacking off through window area wlo success, stacked out @ 6,122' - BID Top Drive 15:00 - 17:30 2.50 TIEBAC N DPRB OTHCMP - POH wi 4" DP & LEM #2 17:30 - 18:00 0.50 TIEBAC N DPRB OTHCMP - PJSM - RIU False Bowl & 2 7/8" Handling Tools 18:00 - 20:00 2.00 TIEBAC N DPRB OTHCMP ,- UD ZXP L TP & 2 7/8" Pack-off Assy. - CIO Elevators - POH 2 7/8" Inner string (stand back in derrick) - UD 2 7/8" Circ. Nozzle Shoe Assy. Printed: 2/7/2005 9:37:45 AM - No abnormal wear or marks on 2 7/8" Circ. Nozzle Shoe - CIO Elevators - RID 2 7/8" Equip. & Handling Tools '- R/U 41/2" Equip. & Handling Tools - POH wI Seal Bore Assy., LEM Hook Hgr., Solid Liner, Seal Assy. - 4 1/2" Mule Shoe lightly scarred in 6 different places around outside perimeter of shoe. Suspect contact wi Collet Profile of Liner Hook Hgr. - RIH w/4 1/2" Bent Seal Assy. JI. (bend 9' from shoe wI 6" off-set), 4 ea. 4 1/2" solid liner jts., 3 ea. 4 1/2" solid liner pup jts., LEM Hook Hgr, Seal Bore Assy. - C/O Elevators - RID 41/2" Equip. & Handling Tools - R/U 27/8" Equip. & Handling Tools - RIH w/2 7/8" Circ. Nozzle Assy. jl., 8 ea. 27/8" Tbg. jts., 5 ea. 27/8" Tbg. Pup jts., Pack-Off Assy. (total length = 279.21 ') - 2 7/8" Circ. Nozzle located 1.97' outside btm. of 4 1/2" Seal Assy. Mule Shoe DPRB OTHCMP - C/O Elevators - P/U & M/U ZXP LTP to 2 7/8" Inner String & 41/2" Outer String - M/U TD & Brk. Circ. @ 4 bpml 350 psi. - LEM Assy. Strg WI. Up 45K, Dn. 50K . DPRB OTHCMP - Service Top Drive DPRB OTHCMP - RIH wI LEM #2 on 4" Dp 116,055' - Strg. WI. Up 133K, Dn. 11 OK DPRB OTHCMP - RIH 116,103', Tag'd Up on Top of Hook Hgr. Rotated string 1 turn & attempted to RIH wI LEM Assy. Through Liner Hook Hgr. LEM Window, Stacked Out @ 6,122'. M/U TD & brk. circ., 3 bpm/500 psi. Turned string in increments of 1; 1/2; 1/4; 1/8; turns attempting to exit LEM window wlo success. Continued to stack out @ 6,122'. Continued to attempt to exit LEM window. Occasionally the Mule Shoe Stacked Out @ 6,117', this depth corresponds with end of Hook Hgr. LEM Window. Continued to attempt to exit window using alternating braking actions & different running speeds wlo success. Rotated string at 5, 10, 20 rpm, Torque 4,500 ftIlbs while slacking off wlo success. DPRB OTHCMP - BID TO - POH wI LEM #2 on 4" Dp - SLM on trip out-no change in DP measurment DPRB OTHCMP - PJSM - B/O & UD ZXP L TP - POH w/2 7/8" Inner Wash String & stand back in derrick - Inspect & UD Circ. Nozzle Shoe Assy. - NO new addtional scarring or marks on Nozzle Shoe DPRB OTHCMP - POH & UD Seal Bore Assy., LEM, 3 ea. 4 1/2" Solid Liner pup jts. 3ea. 4 1/2" Solid Liner jts. - POH w/1 jl. liner & Bent JI. Seal Assy. - 41/2" Mule Shoe had severe scarring from btm. of shoe up through first set of seals. Remove damaged mule shoe and seals fl bent jl. & replaced them with shoe and seals from the I Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES 1/15/2005 18:00 - 20:00 2.00 TIEBAC N DPRB OTHCMP 20:00 - 20:30 0.50 TIEBAC N DPRB OTHCMP 20:30 - 21 :30 1.00 TIEBAC N DPRB ' OTHCMP I I 21 :30 - 22:30 1.00 TIEBAC iN DPRB OTHCMP I 22:30 - 23:00 0.50 TIEBAC N DPRB OTHCMP 23:00 - 00:00 1.00 I TIEBAC N DPRB OTHCMP 1/16/2005 00:00 - 00:30 0.50 TIEBAC N 00:30 - 01 :00 01 :00 - 06:30 0.50 TIEBAC N 5.50 TIEBAC N 06:30 - 12:00 5.50 TIEBAC N 12:00 - 15:00 3.00 TIEBAC N 15:00 - 16:00 1.00 TIEBAC N 16:00 - 17:00 1.00 TIEBAC N Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 Printed: 2m2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 16:00 - 17:00 17:00 - 17:30 0.50 TIESAC N 17:30 - 18:30 1.00 TI EBAC N 18:30 - 20:00 1.50 TIEBAC N 1/17/2005 20:00 - 00:00 00:00 - 00:30 4.00 TIEBAC N 0.50 TIESAC N 00:30 - 03:00 2.50 TIESAC IN I I 03:00 - 04:00 1.00 TIESAC N 04:00 - 08:00 4.00 TIESAC N 08:00 - 10:00 2.00 TIESAC N 10:00 - 11 :30 1.50 TIESAC N 11 :30 - 16:30 5.00 TIESAC N 16:30 - 17:30 1.00 TIESAC N 17:30 - 21 :30 4.00' TIESAC N 21 :30 - 00:00 2.50 TIESAC N DPRS OTHCMP DPRB OTHCMP I DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP orginal seal assy. jt which was not damaged during the first attempt to land LEM #2. - Clear & Clean Rig Floor - Remove Master bushings and vacum out old MOBM from drip pan area. - RIH w/4 1/2" Bent Jt. wI reconditioned mule shoe and seals installed. 4ea.4 1/2" Solid jts., 3 ea. 4 1/2" Pup jts., LEM & new Seal Bore Assy wlo swivel - RIH w/2 7/8" Tbg. Inner string (total length = 275.16') - 2 7/8" Nozzle Shoe protruding .84' beyond btm. of 41/2" Mule Shoe - P/U ZXP L TP & M/U to 2 7/8" inner string & to 5 1/2" Seal Bore Assy. - RIH wi LEM #2 on 4" Dp II 5,225' - RIH wi LEM #2 on 4" Dp II 6,056' - Strg Wt. Up 132K, Dn. 11 OK DPRB OTHCMP - RIH II 6,097', Tag'd Top of Liner Hgr. Rotated 1/4 turn & continued in hole to 6,117'. P/U above Liner Hgr. Top @ 6,097' & apply 1/4 turn in string and attempt to exit Liner Hook Hgr. LEM Window wlo success. Continue to work pipe and apply 1/4 turn increments for each P/U & S/O cycle for 2 full revolutions attempting to exit window wlo success. Still stacking out @ 6,117'. String hanging up @ 6,112 and then breaking loose when 5K Dn. Wt. applied. Suspect mule shoe oriented towards window, (btm. of Liner Hook Hgr. LEM exit window @ 6,111'), but still unable to exit. Apply alternating braking action while slacking off trying to bounce mule shoe out window wlo success. Circ. @ 3 bpml 500 psi wI no effect. ,DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP 'DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP - CBU @ 5 bpml 920 psi - Monitor Well, Static - Blow Dn Top Drive - POH wi LEM #2 assembly on 4" DP. - Change elevators and rack back 3 stds 2 7/8" inner string. - LD 41/2" tubing fl LEM #2. Inspect seal assembly - no obvious signs of scoring or other damage. All seals intact. - Discuss options wI Anchorage and agree way forward. Wait on additional tools to be delivered to site from Baker. Cleaning & general housekeeping while waiting. - RIH w/2 7/8" Tbg fl derrick and POH & UD same - P/U Baker "HR" Liner Running Tool Assy. & RIH on 4" Dp II 6,075' - Establish Working Parameters - Strg. Wt; Up 132K, Dn 120K, Rot. 130K - Rotary; 10 RPM @ 4,500 ftllbs Torque - RIH II 6,097', Tagged Top of Liner Hook Hgr. Continued to RIH & btm'd out in "HR" profile of the Liner Hook Hgr. @ 6,116' - P/U 10' to verify Running tool engaged. S/O & stack 20,000# Dn. to verify Running Tool was seated in profile area. - S/O trying to break string free down, no success I Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/17/2005 21 :30 - 00:00 2.50 TIEBAC N DPRB OTHCMP - P/U in 25,000# increments working pipe in attempt to free liner. @ 300,000# liner came free. Work pipe fl 6,107' tJ 6,129' ("HR" Running Tool Depth) until constant hook loads were established @ Up Wt. 185K & Dn. Wt. 70K. - @ 6105' apply 1 1/2 turn, S/O and attemp to hang Liner Hook Hgr. wlo success. Repeated attempts were made w/1 , 3/4, 1/2, 1/4 turns being applied at different intervals while working string fl 6,107' tJ 6,129', wlo success. These depth settings were established to keep the top of the Liner Hook Hgr. inside the window @ 6,108' while the "HR" Profile of the Liner Hook Hgr. was outside the window app. 9/10' @ 6,129'. - Install 6 turns in string and trap torque of 4,500 ftJlbs. Work pipe through window area. No change in trapped torque. - Suspect dogs on "HR" Running Tool not engaging properly in order to turn Hook Hgr. - PIU 1/5,990' & rotate string @ 10 rpm wi 6,500 fUbs. torque. Torque being steady @ 6,500 ftJlbs verifies that tool is turning, not the liner Hook Hgr. & 4 1/2" Slotted Liner 1 118/2005 00:00 - 02:00 2.00 TIEBAC N DPRB OTHCMP - Work Drlg. String fl 6,107' tJ 6,129' attempting to hang Liner Hook Hgr. @ btm. of widow @ 6'120'. Rotating Dp. in 1/4 turn increments to change location of hook assy. in attempts to find window., wlo success. - Continue to work string while communicating wi Anc. personal on plan forward. - Decision was made to POH wI Hook Hgr. Assy. & 41/2 "Slotted Liner 02:00 - 06:00 4.00 TIEBAC N DPRB OTHCMP - POH wI Liner Hook Hgr. & 4 1/2" Slotted Liner 06:00 - 07:00 1.00 TIEBAC N DPRB OTHCMP I Lay down hook hanger assembly. 07:00 - 08:30 1.50 TIEBAC iN DPRB OTHCMP Clean rig floor. Service rig and TDS. 08:30 - 11 :00 2.50 TIEBAC N DPRB OTHCMP Discuss plan forward with Anchorage team. Rig up to lay down 4.5" liner. 11 :00 - 19:00 8.00 TIEBAC N DPRB OTHCMP Pull and lay down 4.5" liner. Salvage usable centralizers. 25 centralizers damaged beyond future use. 19:00 - 20:00 1.00 TIEBAC N DPRB OTHCMP Rig down 4.5" liner equipment. Clear and clean rig floor. 20:00 - 21 :00 1.00 TIEBAC N DPRB OTHCMP Pick up mill assembly. 21 :00 - 23:00 2.00 TIEBAC N DPRB OTHCMP RIH with milling assembly. Tag no-go at 6,348'. 23:00 - 00:00 1.00 TIEBAC N DPRB OTHCMP Pull up to 6,113' and attempt to orient to window. Up Wt=125K Dn Wt=102K 1/19/2005 00:00 - 03:30 3.50 TIEBAC N DPRB OTHCMP Continue attempting to pass through window. Tried slow rotating while lowering pipe, cease rotation and advancing orientation by 1/4 turns and advancing orientation by 1/8 turns. No success. 03:30 - 06:00 2.50 TIEBAC N DPRB OTHCMP POH with mill assembly to change BHA configuration. 06:00 - 07:00 1.00 TIEBAC N DPRB OTHCMP Break out & LD BHA #24 components. 07:00 - 07:30 0.50 TIEBAC N DPRB OTHCMP Service top drive. 07:30 - 10:00 2.50 TIEBAC N DPRB OTHCMP PU components for BHA #25. Bullnose, 4" pup it, 4" bent it, 2 jts 4" DP, MWD, 9 its 4",2 ea string mills 6.75" OD, 1 jt 4" HWDP, jars, also 5 associated crossovers. Orient bent jt with MWD. 10:00 - 11 :00 1.00 TIEBAC N DPRB OTHCMP RIH & shallow test MWD. 11 :00 - 13:30 2.50 TIEBAC N DPRB OTHCMP RIH to window depth at 6108'. 13:30 - 14:30 1.00 TIEBAC N DPRB OTHCMP Orient 15L with MWD. RIH & tag up on L 1 liner top. POH above Printed: 2n/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/19/2005 13:30 - 14:30 1.00 TIEBAC N DPRB OTHCMP window and make 2 attempts RIH & POH with slow pipe rotation, trying to find window with a torque increase· no success. Orient bent joint @ 13R and go thru window into open hole. 14:30 - 15:30 1.001 TIEBAC N DPRB OTHCMP Work mills up & down thru window from 6102' to 6140' x5. I Didn't see any indications that mills were doing any work downhole from torque or rotary indications. Make one pass without rotating and one pass without rotary or pump - no problems. 15:30 - 16:30 1.00 TIEBAC N DPRB OTHCMP Pull into shoe and circulate bottoms up. Inspect derrick for ice or other hazards. 16:30 - 19:00 2.50' TIEBAC N DPRB OTHCMP Monitor well. Blow down TDS. POOH to BHA. 19:00 - 21 :00 ' 2.00 TIEBAC N DPRB OTHCMP Lay down Milling assemby and MWD (BHA # 25). 21 :00 - 21 :30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor. 21 :30 - 00:00 2.50 TIEBAC N IDPRB OTHCMP PJSM. Rig up and run 4.5" liner as per running detail to 1246' 1/20/2005 00:00 - 04:30 4.50 TIEBAC N ,DPRB OTHCMP Continue to RIH with 4.5" liner as per detailed running procedure. 04:30 - 05:30 1.00 TIEBAC N DPRB OTHCMP Chg elevators. PU liner hook hanger and running tool. Upwt 95K Dn wt 87K. 05:30 - 06:30 1.00 TIEBAC N DPRB OTHCMP Run 4.5" liner on Drill Pipe down to window. 100k up. 90k down. 06:30 - 07:00 0.50 TIEBAC N DPRB OTHCMP Position shoe at mid point of window. Rotate 3 turns to right. Exit window on first attempt. 07:00 - 13:30 6.50 TIEBAC N DPRB OTHCMP Run slotted liner in open hole. Clean to 10420'. From here to TD, took weight in multiple spots but able to PU and work thru each time. Acted as if centralisers or couplings were hanging up in the window. 13:30 - 14:15 0.75 TIEBAC N DPRB OTHCMP PU last single of DP. Work pipe & improve PU & SO wts. PU 18' above hook point. Put in 3/4 turn - no success. 1/2 turn. No success. 1/4 turn - no success. Run deeper past calculated hook point and get hanger hooked 15' deeper than calculated. 14:15 - 15:45 1.50 TI EBAC N DPRB OTHCMP Unhook & hook hanger at same depth x3. Rotate 1/4 turn and run past hook point. Rotate back 1/4 turn and hook x3. Unhook and rotate 1/2 turn. RIH - no hook. PU & rotate another 1/2 turn. RIH & land hook at same depth. Account for depth discrepancy in tally & verify hook depth is correct· OK. 15:45 - 16:30 0.75 TIEBAC N DPRB OTHCMP Load ball in drill pipe and pump down on seat. Pressure up to 2000 psi. PU &verify released from liner - OK. Continue pressuring up and shear ball seat at 3600 psi. Run back in and verify hanger is at same depth. 16:30 - 17:30 1.00 TIEBAC N DPRB OTHCMP POOH standing back Drill Collars to 5424'. 17:30 - 18:30 1.00 TIEBAC N DPRB 10THCMP PJSM. Slip and cut drill line. 18:30 - 21:30 3.00 TIEBAC N DPRB 10THCMP POOH (SLM). Lay down hanger running tool. Clear and clean rig floor. 21 :30 - 23:30 2.00 TIEBAC N DPRB OTHCMP PJSM. Rig up and pick up LEM #2 23:30 - 00:00 0.50 TIEBAC N DPRB OTHCMP Change out handling equipment and pick up & run inner string. 1/21/2005 00:00 - 02:30 2.50 TIEBAC N DPRB OTHCMP Pick up and run inner string inside LEM assembly. 02:30 - 03:00 0.50 TIEBAC N SFAL OTHCMP While making up first stand of drill pipe onto LEM assembly, a 1/2" bolt, 2-1/4" long with a 3/4" head broke off of the iron roughneck and fell past the slips into the hole. Drained the stack and looked for the bolt without success. 03:00 - 05:00 2.00 TIEBAC N SFAL OTHCMP Gather the rig team, fisherman, LEM tech and ANC staff to Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/21/2005 03:00 - 05:00 2.00 TIESAC N SFAL 10THCMP . discuss options with all parties. 05:00 - 06:00 1.00 TIESAC N SFAL OTHCMP I Salt is now visible sitting in annular space between 75/8" casing and the liner top packer - laying sideways on tapered I bore at top of wear ring. Call for magnet 1.75" OD. Will attempt I to fish bolt out with this. Change plan as 1.75" magnet will be I too big to go down to bolt. 06:00 - 09:30 3.50 TIESAC N SFAL OTHCMP I Use thin magnet from rig and attempt to retrieve bolt. Make I I several unsuccessful attempts. Change to mechanics magnet - i stronger. Run in and retrieve bolt which appeared to be almost I brand new. 09:30 - 16:00 6.50 TIESAC N DPRS OTHCMP I RIH with LEM package on drill pipe 16:00 - 17:30 1.50 TIEBAC N DPRB OTHCMP . Land LEM on hanger while circulating through workstring when seal assembly is entering SBR. Pick up 15K over to verify LEM is latched into hook hanger. 17:30 - 18:30 1.00 TIESAC P OTHCMP Drop ball and pump down to seat. Pressure up to 3200 psi to i set ZXP packer and hold pressure for 5 minutes. Increase I pressure to 4150 psi to release running tool. Bleed pressure to o psi. Close annular preventer and pressure test packer to 1500 psi for 10 minutes, good test. Pressure up drill pipe to 500 psi and pick up to observe pressure drop to 0 psi, OK. 18:30 - 22:30 4.00 TIEBAC P OTHCMP POOH with LEM running tools and inner string. 22:30 - 00:00 1.50 TIESAC P OTHCMP Lay down running tools and inner string. 1/22/2005 00:00 - 01 :00 1.00 TIESAC P OTHCMP Continue laying down LEM running equipment. 01 :00 - 02:00 1.00 TIEBAC P OTHCMP Rig down tubing equipment. Clean rig floor. 02:00 - 06:30 4.50 STWHIP P WEXIT PJSM. Pick up Whipstock assembly, MWD, drill collars and HWDP. Shallow test MWD. 06:30 - 10:30 4.00 STWHIP P WEXIT RIH with whipstock assembly, orient whipstock to 17L and set seals at 6063'. Set bottom anchor and shear off mills. 132K Up Wt. 107K Dn Wt. 10:30 - 12:15 1.75 STWHIP P WEXIT Displace SFOSM with warm (100 degrees) MOSM at 84 SPM, 1850 psi. Capture returned SFOBM into vac trucks for return to mud plant. 12:15 - 12:30 0.25 STWHIP P WEXIT i Begin milling window. TOW at 5986'. 12:30 - 13:30 1.00 STWHIP P WEXIT Service rig and TDS. 13:30 - 15:30 2.00 STWHIP N RREP WEXIT Problem with TDS brake. Troubleshoot and repair. 15:30 - 20:30 5.00 STWHIP P WEXIT Resume milling operations. Mill window and 33' of formation to 6018'. TOW = 5986' SOW = 5998' 20:30 - 22:30 I 2.00 STWHIP P WEXIT Circulate bottoms up and pump a hi vis sweep around. Note-75 Ibs metal captured at surface during milling and circulating operations. 22:30 - 00:00 1.50 STWHIP P WEXIT POOH from 6018' to 5702'. 1/23/2005 00:00 - 02:00 2.00 STWHIP P WEXIT POOH from 5702' to BHA. 02:00 - 04:30 2.50 STWHIP P WEXIT Stand back HWDP and DC. Lay down milling SHA. 04:30 - 05:00 0.50 STWHIP P WEXIT Clean and clear rig floor. 05:00 - 06:30 1.50 BOPSUF P WEXIT Function and flush BOP stack. 06:30 - 08:30 2.00 STWHIP P WEXIT Pick up 6.75" drilling BHA. 08:30 - 09:30 1.00 STWHIP N RREP WEXIT Repair air valve on top drive. 09:30 - 10:30 1.00 STWHIP,P WEXIT Continue PU SHA #27. PJSM & load nuclear source. 10:30 - 14:30 4.00 STWHIP P WEXIT RIH picking up singles drill pipe from shed. I Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/23/2005 14:30 - 15:00 0.50 STWHIP P WEXIT Shallow test MWD. 15:00 - 19:00 4.00 STWHIP P WEXIT RIH to above top of window at 5958'. 19:00 - 20:00 1.00 STWHIP P WEXIT Circulate to establish basline ECD. Orient BHA and pass through window. 20:00 - 00:00 4.00 DRILL P PROD5 Directional drill 6.75" hole from 6018' to 6250'. PU wt 120K. SO Wt 105K. TVD 5137'. 1/24/2005 00:00 - 12:00 12.00 DRILL P PROD5 Directional drill 6.75" hole from 6250' to 7013'. UP wt 121K. Dn wt 92K. Rt wt 105K. TO on 5K. TO off 5K. ROT 80. WOB 2K. 332 GPM. 2750 psi. AST 5.28. ART .7. 12:00 - 00:00 12.00, DRILL P PROD5 Directional drill 6.75" hole from 7013' to 7974'. UP wt 118K. Dn wt 93K. Rt wt 100K. TO on 5-6K. TO off 5-6K. ROT 80. WOB 4K. 332 GPM. 2750 psi. AST 3.6. ART 3.16. Calculated ECD = 10.00 to 10.10 Actual ECD = 10.4 to 10.52 1/25/2005 00:00 - 08:30 8.50 DRILL P PROD5 Directional drill 6.75" hole from 7974' to 8874'. 08:30 - 09:00 0.50 i DRILL P PROD5 : Circulate sweep around. 09:00 - 12:00 3.00 I DRILL P PROD5 Directional drill 6.75" hole from 8874' to 9030'. UP wt 123K. Dn wt 88K. Rt wt 105K. TO on 7K. TO off 6K. ROT 80. WOB 5K. 332 GPM. 3000 psi. AST .73. ART 3.27. 12:00 - 00:00 12.00 DRILL P PROD5 Directional drill 6.75" hole from 9030' to 10,056'. UP wt 133K. Dn wt 91K. Rt wt 107K. TO on 7K. TO off 6K. ROT 80. WOB 5K. 310 GPM. 3240 psi. AST 1.72. ART 3.31. Calculated ECD = 10.48 Actual ECD = 10.89 1/26/2005 00:00 - 12:00 12.00 DRILL P PROD5 Continue drilling 6.75" hole 10,056' to 10,765' MD. 138 klbs up. 84 klbs down. 110 klbs rot. Torque: On btm 8 kit Ibs. Off btm 7 kit Ibs. 330 gpm @ 3380 psi. 12:00 - 00:00 12.00 DRILL P PROD5 Continue drilling 6.75" hole from 1 0,765' MD to 11,592'. 145 klbs up. 78 klbs down. 110 klbs rot. Torque: On btm 8-9 kit Ibs. Off btm 7-8 kit Ibs. 330 gpm @ 3460 psi. Total for day - AST = 5.37 ART = 2.66 Calculated ECD = 10.61 Actual ECD = 10.80 1/27/2005 00:00 - 03:30 3.50 DRILL P PROD5 Continue drilling 6.75" hole from 11,592' to 11 ,943'. ECD at hardline. 03:30 - 04:00 0.50 DRILL P PROD5 CBU and sweep to clean hole and lower ECD 04:00 - 05:00 1.00 DRILL P PROD5 Continue drilling 6.75" hole from 11,943' to 12054'. Have difficulty sliding due to excessive drag. Decision made to TD hole at this point. AST = 1.15 ART = .75 05:00 - 08:00 3.00 DRILL P PROD5 Circulate and condition hole for short trip. 08:00 - 20:30 12.50 DRILL P PROD5 POOH backreaming from 12,054' to 6798'. Tight spot at 10,867'. Worked through, cleaned up. 20:30 - 23:00 2.50 DRILL P PROD5 POOH I MAD pass from 6798' to 6084'. 80 rpm, 70spm, 250 PROD5 gpm, 1900 psi. Pull up above window. 23:00 - 23:30 0.50 DRILL P Make up and set RTTS at 50'. I Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/27/2005 23:30 - 00:00 0.50 DRILL P PROD5 Pull wear bushing. Set test plug. Rig up and test BOPE. Witness of test waived by AOGCC Rep Jeff Jones. 1/28/2005 00:00 - 08:00 8.00 ¡ CASE P PROD5 Continue test BOPE's tJ 250 psi lowl 3,500 psi high. Witness I of test waived by AOGCC Rep., Jeff Jones. Choke line HCR I I valve failed test. Top drive upper IBOP failed test. 08:00 - 00:00 16.00 CASE N RREP i PROD5 ! Replace choke line HCR - OK. Replace failed upper IBOP. When making up, the box of the new one swelled. Remove same and re-build previous one. 1/29/2005 00:00 - 03:00 3.00 CASE N RREP PROD5 Continue repairs to IBOP. Complete & test same to 250/3500 03:00 - 04:30 I I psi -OK. 1.50 CASE P PROD5 Run in and retrieve storm packer and drillstring. Well static. LD I RTTS. 04:30 - 09:30 5.00 CASE Ip PROD5 RIH to bottom - hole in good condition. Saw slight bobble at I 10867' but went straight on thru. 09:30 - 12:00 2.50 CASE P PROD5 Break circ & stage pumps up to 290 gpm. Pump 20 bbllow vis sweep followed by 20 bbl weighted sweep surf to surf. 285 gpm I @ 3280 psi. 80 rpm. 12:00 - 14:00 2.00 CASE P PROD5 Displace well to 9.2 ppg solids free MOBM. 285 gpm @ 3200 psi. 80 rpm. CBU X2 to condition & warm mud. 14:00 - 18:30 4.50 CASE P PROD5 Monitor well. Static. POH to window racking back DP. Hole in good condition - no tight spots. 18:30 - 21 :00 2.50 CASE P PROD5 Cont POH LDDP to 3800'. 21 :00 - 22:00 1.00 CASE P PROD5 Service top drive & replace bolts on grabber. 22:00 - 00:00 2.00 CASE P PROD5 Continue POH to 2700' LDDP. 1/30/2005 00:00 - 03:15 3.25 CASE P PROD5 Continue POH LDDP. 03:15 - 03:30 0.25 CASE P PROD5 PJSM for removing source from LWD tool. 03:30 - 06:30 3.00 CASE P PROD5 Remove RA source. LD BHA #27. Clear & clean rig floor. 06:30 - 08:00 1.50 WHIP P RUNPRD MU whipstock retrieval BHA. Orient and test MWD - OK. 08:00 - 11 :00 3.00 WHIP P RUNPRD RIH on 4" DP to recover whipstock. 11 :00 - 12:00 1.00 WHIP P RUNPRD Break circ & stage up to 300 gpm @ 1720 psi - 125k up, 102k down. Orient hook to 17L and engage hook into whipstock. Verify engaged. Pull 50 klbs over & let jars bleed off. Increase to 80 klbs over & release anchor - OK. 12:00 - 13:00 1.00 WHIP P RUNPRD CBU X2 - 300 gpm @ 1750 psi. , Monitor well - static. Blow dn top drive. 13:00 - 16:00 3.00 WHIP P RUNPRD POH with whipstock. Rack back DP & HWDP. 16:00 - 18:30 2.50 WHIP P RUNPRD I LD all whipstock retrieving tools & MWD. LD whipstock. 18:30 - 19:30 1.00 WHIP P RUNPRD I Clear floor & clean drip pan under rotary table. 19:30 - 20:00 0.50 CASE P RUNPRD RU to run 4.5" liner 20:00 - 20:30 0.50 CASE P RUNPRD PJSM BPX, Doyon, Doyon Casing, MI. Run 4.5" liner. 20:30 - 00:00 3.50 CASE P RUNPRD Run 4.5" 12.6# L-80 IBTslotted liner. -80 jts in @ midnight. 1/31/2005 00:00 - 03:00 3.00 CASE P RUNPRD Continue running 4.5" slotted liner for L3 lateral. 127 jts slotted, Ip swell packer, 9 solid, swell packer, 2 solid, hook hanger. 03:00 - 04:45 1.75 CASE RUNPRD MU hanger to 4" DP. Run in 1 std + 60' to middle of window. I Rotate 3 turns & RIH. Tag previous liner top. Pull out above window and apply 1/4 turn. Run in and tag liner top again. Repeat and on 5th 1/4 turn applied, exited window successfully. 04:45 - 12:30 7.75 CASE P RUNPRD Run liner into open hole on 4" DP to 11,735'. Saw no problems when running liner in open hole. 12:30 - 13:00 0.50 CASE P RUNPRD Get weights - 185 klbs up. 85 klbs dn. MU TD. RIH past hook point to 11812'. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: Spud Date: 12/29/2000 End: 2/3/2005 11/19/2004 2/3/2005 9ES 1/31/2005 12:30 - 13:00 0.50 CASE P RUNPRD PU 20' and apply 1/4 turn @ surface. Run in and engage hook hanger to put shoe at 11,804'. PU & apply 1/2 turn. Run past hook depth. . PU & apply another 1/2 turn. RIH & engage hook. Repeat x 2. Hanger is hooked on depth. 13:00 - 13:30 0.50 CASE P RUNPRD Drop setting ball & pump on seat - 4 bpm @ 650 psi. I 1.00/ CASE Pressure up to 3500 psi & release from liner. PU & verify off liner, PI U Weight 132klbs - OK. PU 50'. 13:30 - 14:30 I P RUNPRD CBU x 2 above liner - 7 bpm @ 1,480 psi. Monitor well. Run in & tag liner on depth. Blow down top drive. 14:30 - 16:00 1.50 CASE P RUNPRD PJSM. Slip & cut drilling line. Service top drive. 16:00 - 19:00 3.00 CASE P RUNPRD POH with hook hanger running tool. 19:00 - 19:30 0.50 CASE P RUNPRD LD liner running tool. 19:30 - 20:00 0.50 CASE P RUNPRD Clear floor & clean under rotary table. 20:00 - 20:45 0.75 CASE ip TIEB3 RU to run 4.5" LEM assembly #3. 20:45 - 21 :00 0.25 CASE P TIEB3 PJSM for running LEM. 21 :00 - 23:00 2.00 CASE P TIEB3 MU LEM assembly #3 With inner string & setting tool on 1 std DP. 23:00 - 23:30 0.50 CASE Ip TIEB3 Remove Anadrill pressure sensor from standpipe and plug I outlet. 23:30 - 00:00 0.50 CASE P TIEB3 RIH with LEM assembly on 4" DP. 2/1/2005 00:00 - 04:00 4.00 CASE P TIEB3 RIH wI LEM Assembly #3 on 4" DP to 5,980'. Established Parameters: String Weight Up 135,000#, String Weight Down 122,000#. 04:00 - 05:00 1.00 CASE P I I 1.001 CASE P TIEB3 05:00 - 06:00 TIEB3 06:00 - 06:30 0.50 CASE P TIEB3 06:30 - 10:00 3.50 CASE P TIEB3 10:00 - 10:30 0.50 CASE P TIEB3 10:30 - 14:30 4.00 CASE P TIEB3 M I U Top Drive, Washed Down Through Top of Hook Hanger. Continued to Wash Down into PBR on L2 LEM. Tagged Up 8' High on First 2 Attempts, Applied 1/4 Turn x 2 and Landed LEM Assembly. PI U wi 15,000# Overpull to Verify LEM Collet in Place. Dropped Setting Ball and Pumped onto Seat; ICR 4 bpm, 500 psi, FCR 1bpm, 50 psi. Pressured Up to 4,000 psi to Release Running Tool and Set ZXP Liner Top Packer, Observed Good Indication on Surface of Packer Setting. Closed Upper Pipe Rams and Tested 7-5/8" and ZXP Packer to 1,500 psi f/15 Minutes, OK. Bled Down Pressure, Opened Rams. POOH wi 3 Stands to 5,840'. Circulated to Condition Mud, Pump Rate 3 bpm, 500 psi. Waited on Brine Trucks. Held PJSM wI MI - Rig Crew - Truck Drivers - Tool Pusher - Drilling Supervisor. Displaced Well bore to 9.3 ppg Brine; Pumped 25 bbls LVT from Pit #4, Shut Down to Clean Pit #4, Pumped 25 bbls 9.3 ppg Viscosified Brine - 50 bbls 9.3 ppg Brine w/1% Safe-Surf- 50 bbls 9.3 ppg Viscosified Brine - 300 bbls Clean 9.3 ppg Brine, Staged Up Pumps at the Following Rates: 3.5 bpm 600 psi 5.0 bpm 750 psi 6.0bpm 1,100 psi Over Displaced By 50 bbls to Ensure Clean Well bore Fluid. Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 2/2/2005 10:30 - 14:30 14:30 - 15:00 15:00 - 16:00 16:00 - 23:30 23:30 - 00:00 00:00 - 02:00 02:00 - 02:30 02:30 - 04:00 04:00 - 06:00 S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 4.00 CASE 0.50 CASE 1.00 CASE 7.50 CASE 0.50 CASE 2.00 CASE 0.50 CASE Monitored Well, Static. Blew Down Top Drive. Serviced Rig Repaired Top Drive POOH, LID 4" HWDP, 4-3/4" DC, 4" DP. RIH wI excess Dp in derrick POOH & LI D DP Clear'd & Clean'd Rig Floor Pull'd Wear Bushing RUNCMP PJSM R I U I-Wire Spooler, Overhead Sheaves, Tbg. Tongs & Hand Tools RUNCMP PJSM M I U 4-1/2" Tail Pipe: 4-1/2" Mule Shoe Assy wI 5.60" OD No-Go Locator - Lwr X Nipple Assy - Upper X Nipple Assy wI RHC-M Sleeve - 1 Jt 4-1/2" Tubing - 4-1/2" x 7 5/8" Premier Pkr - 7-5/8" Phoenix Jet Pump Gauge Assy - 4-1/2" Sliding Sleeve 7" Phoenix Discharge Pressure Gauge Assy. M I U and Tested I - Wire Connection. RUNCMP M I U and RIH wi 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to First 10 Joints, Then to Every Other Joint. Tested I - Wire Continuity Every 30 Joints. RUNCMP Pinched I - Wire on Tubing Slips, Broke Metal Casing. Cut and Spliced I - Wire. Tested Continuity - OK. RUNCMP M I U and RIH wI 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to Every Other Joint. Tested I - Wire Continuity Every 10 Joints. RUNCMP M I U Jts. #135, #136 for Tag Up on No-Go in Tieback. String Wt. Up 97K, Dn 92K Tagged Up @ 16.53' in on Jt. #136, obtain measurements for Space Out. U D Jts. #136, #135, & #134. P/U & M/U Space Out Pups 9.80', 9.82', 7.82'. P/U Jt. #134, Tbg. Hgr. & Ldg. Jt. RUNCMP MIU I-Wire through Tbg. Hgr. and Test Integrety of fittings & Wire Continuity RUNCMP . RIH & Land Hgr. in Tbg. Spool, Check landing marks to insure proper land out & RILDS RUNCMP M/U Circ. Lines to 7 5/8" x 41/2" Annulus & Ldg. Jt. Pressure Test Lines 1/4,000 psi. RUNCMP : Reverse Circ. 100 bbls. Corrosion Inhibited 9.3 Brine Dn. 75/8" I x 41/2" Annulus @ 3 bpm @ 200psi RUNCMP I Drop 1 7/8" BallI Rod Assy. & Pressure up on Tbg. 1/4,200 'psi. to Set the Pkr. (hold 5 min.). Bleed pressure down to 3,500 psi. to Test Tbg. (hold 30 min.). Bleed pressure down to 2,500 psi. & shut in same. Pressure up the 7 5/8" x 4 1/2" ann. to 3,500 psi. (hold 30 min.). Bled pressure off Tbg. (2,500 psi) & allow pressure on the IA (3,500psi.) to shear DCK Valve. Bleed off all excess pressure. To insure opening of the DCK Valve Rev. Circ. Dn IA @ 3 bpm @ 900 psi. & then Dn Tbg @ 3 bpm @ 875 psi. RUNCMP Blow Dn. all Circ. Lines & RID same from IA & Ldg Jt. 1.50 RUNCOrvP 2.00 RUNCOrvP I 06:00 - 14:00 8.00 RUNc01 , I 14:00 - 15:00 ' 1.00 RUNCOM\J HMAN 15:00 - 17:00 2.00 RUNCOIVP 17:00 - 18:30 1.50 RUNCOIVP 18:30 - 19:30 19:30 - 20:00 20:00 - 21 :00 21 :00 - 22:00 .22:00 - 00:00 2/3/2005 00:00 - 00:30 00:30 - 01 :00 1.00 RUNCOMP 0.50 RUNCOIIAP 1.00 RUNCOIVP 1.00 RUNCOMP 2.00 I RUNCOIVP I ! I I 0.50' RUNCOMP 0.50 RUNCOIVP I I RUNCMP UD Ldg. Jt., Set TWC in Tbg. Hgr. & Test from below 1/1,000 psi. OK Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 2/3/2005 01 :00 . 04:30 3.50 BOPSUF P OTHCMP PJSM N/D BOPE, Remove Rotary Master Bushings & clean drip pan area. 04:30 . 08:30 4.00 WHSUR P OTHCMP PJSM N/U Adapter Flange & Tree, Tested Neck Seal & void V 5,000 psi. Good Test Test I·Wire Continuity- OK 08:30 - 09:00 0.50 WHSUR P OTHCMP R/U & Test Production Tree V 5,000 psi. Good Test, RID test 1.00 WHSUR I P lines. 09:00 - 10:00 OTHCMP R/U DSM & Pull'd TWC, RID DSM 10:00 - 11 :00 1.00 WHSUR P OTHCMP PJSM R/U Little Red V 7 5/8" x 41/2" IA. Pressure Test lines V 3,OOOpsi. 11 :00 - 12:30 1.501 WHSUR P OTHCMP Pump 100 bbls Diesel Freeze Protect @ 2 bpm @ 1,000 psi. 12:30 - 14:00 1.50 WHSUR P OTHCMP ¡ U-Tube Diesel, 200 psi. on IA & Tbg. when done. Well bore ¡Fluid. I Hydrostatic Pressure 2,132 psi. , Formation Pressure 2,300 psi. 14:00 - 15:30 1.50 WHSUR P OTHCMP PJSM R/U DSM Lubricator, Set BPV., RID DSM. Tested BPV V 1,000 psi. from below. OK. Little Red sucked excess diesel from lines & RID same 15:30 - 17:00 1.50 WHSUR P OTHCMP RID Secondary IA Valve, DSM Installed VR Plugs 17:00 - 18:00 1.00 WHSUR P OTHCMP Secured Well, Clear & Clean Cellar area. 18:00 - 00:00 6.00 I WHSUR P RUNCMP Clean MOBM fl Dp Drain Racks, Drip Pans, All under floor containments, Misc. Rig Components. Rig Released @ 2400 hrs. on 2-3-05 Printed: 2/7/2005 9:37:45 AM S-213AL2 Survey Report s lumberuer Report Date: 1/8/2005 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure I Slot: S-PAD I S-213 Well: S-213 Borehole: S-213AL2 UWV API#: 500292299362 Survey Namel Date: S-213AL21 January 8,2005 Torti AHD/ DDII ERD ratio: 409.968' 18502.61 II 16.913/1.650 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LatILong: N 70.35551358, W 149.03415537 Location Grid NlE YIX: N 5980549.840 IIUS, E 618929.960 IIUS Grid Convergence Angle: +0.90963906' Grid Scale Factor: 0.99991607 Survey I DLS Computation Method: Minimum Curvature I Lubinski Vertical Section Azimuth: 237.400' Vertical Section Origin: N 0.000 II, E 0.000 II TVD Reference Datum: Rotary Table TVD Reference Elevation: 61.82 II relative to MSL Sea Bed I Ground Level Elevation: 35.90 II relative to MSL Magnetic Declination: 24.779' Total Field Strength: 57613.876 nT Magnetic Dip: 80.846' Declination Date: January 07,2005 Magnetic Declination Model: BGGM 2004 North Reference: True North Total Corr Mag North -> True North: +24.779' Local Coordinates Referenced To: Well Head . Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) (II) (II) (II) (It) (II) (II) (deg/100 II) (IIUS) (IIUS) Projected-Up 0.00 0.00 297.52 -61.82 0.00 -0.02 0.00 0.11 0.05 -0.10 0.00 5980549.89 618929.86 N 70.35551372 W 149.03415617 MWD+IFR:AK 155.42 0.08 297.52 93.60 155.42 -0.04 0.11 0.22 0.10 -0.20 0.05 5980549.94 618929.76 N 70.35551386 W 149.03415697 233.49 0.19 189.70 171.67 233.49 0.08 0.25 0.27 0.00 -0.27 0.29 5980549.84 618929.69 N 70.35551358 W 149.03415754 327.03 0.28 217.18 265.21 327.03 0.44 0.63 0.55 -0.33 -0.43 0.15 5980549.50 618929.53 N 70.35551266 W 149.03415888 415.75 0.46 188.45 353.93 415.75 1.00 1.19 1.06 -0.86 -0.62 0.29 5980548.97 618929.36 N 70.35551123 W 149.03416037 509.99 0.27 140.23 448.17 509.99 1.50 1.76 1.50 -1.40 -0.53 0.37 5980548.43 618929.45 N 70.35550974 W 149.03415966 602.31 0.35 136.82 540.48 602.30 1.76 2.26 1.79 -1.78 -0.20 0.09 5980548.06 618929.79 N 70.35550872 W 149.03415697 694.94 0.40 110.75 633.11 694.93 1.93 2.86 2.12 -2.10 0.30 0.19 5980547.75 618930.29 N 70.35550785 W 149.03415294 787.96 0.15 142.58 726.13 787.95 2.02 3.29 2.41 -2.31 0.68 0.31 5980547.54 618930.67 N 70.35550727 W 149.03414987 883.26 0.36 98.80 821.43 883.25 2.05 3.70 2.67 -2.45 1.05 0.29 5980547.40 618931.05 N 70.35550687 W 149.03414686 976.53 0.43 98.44 914.70 976.52 1.97 4.34 3.06 -2.55 1.68 0.08 5980547.32 618931.68 N 70.35550661 W 149.03414169 1069.16 0.53 98.28 1007.32 1069.14 1.86 5.12 3.62 -2.66 2.45 0.11 5980547.22 618932.45 N 70.35550630 W 149..46 1160.63 0.56 78.60 1098.79 1160.61 1.59 5.98 4.23 -2.64 3.31 0.21 5980547.26 618933.31 N 70.35550638 W 149. 50 1253.35 0.77 70.45 1191.50 1253.32 1.01 7.05 4.93 -2,34 4.34 0.25 5980547.57 618934.34 N 70.35550719 W 149.03412013 1347.39 1.25 70.29 1285.53 1347.35 0.03 8.71 6.16 -1.78 5.90 0.51 5980548.15 618935.89 N 70.35550871 W 149.03410745 1439.53 1.80 76.02 1377.64 1439.46 -1.30 11.16 8.32 -1.09 8.25 0.62 5980548.88 618938.23 N 70.35551059 W 149.03408837 1534.40 1.41 74.91 1472.47 1534.29 -2.67 13.82 10.83 -0.43 10.82 0.41 5980549.58 618940.79 N 70.35551241 W 149.03406747 1630.00 0.74 66.98 1568.05 1629.87 -3.68 15.61 12.53 0.12 12.53 0.72 5980550.16 618942.48 N 70.35551390 W 149.03405364 1723.15 2.46 259.23 1661.18 1723.00 -3.15 17.31 11.12 -0.02 11.12 3.42 5980550.00 618941.08 N 70.35551353 W 149.03406509 1814.13 6.28 254.60 1751.88 1813.70 0.38 24.24 4.72 -1. 71 4.40 4.21 5980548.20 618934.39 N 70.35550892 W 149.03411964 1863.71 6.40 256.71 1801.15 1862.97 3.19 29.71 3.19 -3.06 -0.90 0.53 5980546.76 618929.10 N 70.35550522 W 149.03416271 1907.37 6.39 253.07 1844.54 1906.36 5.74 34.58 7.07 -4.33 -5.60 0.93 5980545.42 618924.43 N 70.35550175 W 149.03420081 2000.61 6.09 240.31 1937.24 1999.06 12.18 44.67 17.01 -8.29 -14.86 1.52 5980541 .32 618915.24 N 70.35549093 W 149.03427601 2095.16 5.63 239.01 2031.29 2093.11 19.22 54.32 26.66 -13.16 -23.19 0.51 5980536.31 618906.98 N 70.35547762 W 149.03434367 2187.42 5.36 237.61 2123.13 2184.95 25.81 63.16 35.49 -17.80 -30.71 0.33 5980531.56 618899.54 N 70.35546495 W 149.03440472 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 1 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (It) (It) (It) (deg/100 It) (ltUS) (ltUS) 2282.02 5.13 235.24 2217.33 2279.15 32.44 71.80 44.13 -22.58 -37.91 0.33 5980526.66 618892.41 N 70.35545190 W 149.03446323 2375.30 7.07 239.64 2310.08 2371.90 39.88 81.71 54.03 -27.86 -46.29 2.14 5980521.25 618884.12 N 70.35543747 W 149.03453128 2469.73 12.17 244.54 2403.15 2464.97 50.80 97.48 69.77 -35.08 -60.31 5.47 5980513.81 618870.22 N 70.35541775 W 149.03464505 2503.22 14.39 244.19 2435.74 2497.56 55.96 105.17 77 .44 -38.41 -67.24 6.63 5980510.37 618863.34 N 70.35540865 W 149.03470135 2532.82 15.76 243.38 2464.32 2526.14 61.19 112.87 85.12 -41.81 -74.14 4.68 5980506.86 618856.49 N 70.35539935 W 149.03475742 2562.81 17.56 242.48 2493.05 2554.87 67.12 121.46 93.71 -45.73 -81.80 6.06 5980502.82 618848.90 N 70.35538866 W 149.03481957 2591.90 19.43 241.38 2520.64 2582.46 73.60 130.69 102.94 -50.Q7 -89.94 6.54 5980498.35 618840.84 N 70.35537678 W 149.03488567 2628.07 19.93 240.84 2554.70 2616.52 82.28 142.87 115.12 -55.96 -100.60 1.47 5980492.30 618830.27 N 70.35536070 W 149.03497226 2655.84 20.53 241.04 2580.75 2642.57 89.14 152.48 124.72 -60.62 -109.00 2.17 5980487.50 618821.95 N 70.35534796 W 149.03504042 2686.92 21.45 241.15 2609.77 2671.59 97.08 163.61 135.85 -66.00 -118.74 2.96 5980481.97 618812.29 N 70.35533326 W 149.03511955 2718.71 22.14 240.27 2639.29 2701.11 105.54 175.41 147.66 -71.78 -129.04 2.40 5980476.03 618802.09 N 70.35531748 W 149.0.3 2749.91 23.21 238.46 2668.08 2729.90 114.37 187.44 159.68 -77.91 -139.38 4.09 5980469.73 618791.84 N 70.35530073 W 149.0 4 MWD+IFR:AK 2798.38 24.47 236.38 2712.41 2774.23 129.18 207.03 179.24 -88.46 -155.88 3.12 5980458.92 618775.52 N 70.35527190 W 149.03 12 Tie-In Survey 2856.54 26.47 236.45 2764.92 2826.74 148.37 232.04 204.19 -102.30 -176.72 3.44 5980444.76 618754.90 N 70.35523410 W 149.03559029 Blind ( Inc IAB+Trend) 2909.66 29.58 236.00 2811.80 2873.62 167.58 256.99 229.10 -116.18 -197.46 5.87 5980430.55 618734.39 N 70.35519619 W 149.03575870 Blind ( Inc IAB+ Trend) 3006.92 33.61 231.80 2894.64 2956.46 208.12 307.92 279.81 -146.26 -238.54 4.72 5980399.82 618693.80 N 70.35511399 W 149.03609224 MWD+IFR+MS 3102.80 37.72 227.46 2972.53 3034.35 254.98 363.79 335.10 -182.53 -281.03 5.03 5980362.89 618651.89 N 70.35501492 W 149.03643724 3199.21 41.06 226.91 3047.03 3108.85 307.61 424.97 395.51 -224.11 -325.89 3.48 5980320.61 618607.70 N 70.35490132 W 149.03680152 3295.21 43.34 232.11 3118.17 3179.99 361.63 489.42 459.65 -265.90 -374.94 4.34 5980278.05 618559.32 N 70.35478715 W 149.03719974 3392.93 45.61 237.12 3187.91 3249.73 415.45 557.86 528.06 -305.46 -430.75 4.28 5980237.60 618504.15 N 70.35467904 W 149.03765290 3488.29 44.79 237.13 3255.11 3316.93 466.84 625.52 595.67 -342.19 -487.58 0.86 5980199.98 618447.92 N 70.35457870 W 149.03811430 3584.58 45.23 235.98 3323.18 3385.00 518.99 693.62 663.75 -379.73 -544.40 0.96 5980161.55 618391.71 N 70.35447615 W 149.03857564 3680.92 44.69 235.88 3391.35 3453.17 571.61 761.69 731.81 -417.86 -600.79 0.57 5980122.53 618335.93 N 70.35437195 W 149.03903347 3776.78 45.06 236.81 3459.28 3521.10 623.56 829.33 799.43 -455.34 -657.08 0.79 5980084.16 618280.24 N 70.35426955 W 149.03949057 3873.18 44.60 236.48 3527.65 3589.47 675.54 897.29 867.38 -492.71 -713.85 0.53 5980045.90 618224.08 N 70.35416745 W 149.03995146 3968.74 44.05 237.25 3596.01 3657.83 726.45 964.06 934.13 -529.21 -769.76 0.81 5980008.53 618168.76 N 70.35406773 W 149.04040540 4064.79 43.64 237.36 3665.29 3727.11 776.84 1030.60 1000.63 -565.15 -825.75 0.43 5979971.70 618113.35 N 70.35396952 W 149.04085999 4160.95 43.86 238.30 3734.75 3796.57 826.80 1097.09 1067.08 -600.55 -882.04 0.71 5979935.42 618057.64 N 70.35387279 W 149.04131697 4257.35 43.42 238.37 3804.51 3866.33 876.40 1163.62 1133.54 -635.47 -938.67 0.46 5979899.60 618001.58 N 70.35377736 W 149..668 4348.86 43.94 237.59 3870.69 3932.51 923.78 1226.82 1196.70 -668.98 -992.25 0.82 5979865.25 617948.54 N 70.35368580 W 149. 170 4446.91 43.12 237.35 3941.78 4003.60 974.80 1294.35 1264.21 -705.30 -1049.18 0.85 5979828.04 617892.20 N 70.35358657 W 149.04267393 4545.83 44.42 236.52 4013.21 4075.03 1026.92 1362.77 1332.63 -742.64 -1106.53 1.44 5979789.80 617835.46 N 70.35348455 W 149.04313946 4641.52 44.65 236.80 4081 .42 4143.24 1078.24 1429.89 1399.74 -779.52 -1162.59 0.32 5979752.03 617779.99 N 70.35338376 W 149.04359463 4737.67 43.99 236.28 4150.21 4212.03 1129.69 1497.06 1466.91 -816.56 -1218.64 0.78 5979714.11 617724.54 N 70.35328255 W 149.04404961 4831.97 43.63 236.15 4218.26 4280.08 1179.94 1562.34 1532.19 -852.86 -1272.89 0.39 5979676.96 617670.88 N 70.35318336 W 149.04449008 4928.03 44.71 235.59 4287.16 4348.98 1231.71 1629.28 1599.13 -890.41 -1328.29 1.20 5979638.53 617616.08 N 70.35308073 W 149.04493984 5023.20 44.27 235.98 4355.06 4416.88 1283.37 1695.97 1665.82 -927.92 -1383.45 0.54 5979600.16 617561.54 N 70.35297825 W 149.04538755 5119.83 43.93 235.90 4424.45 4486.27 1335.33 1763.21 1733.06 -965.58 -1439.16 0.36 5979561.62 617506.44 N 70.35287533 W 149.04583980 5216.82 44.04 234.58 4494.24 4556.06 1387.89 1830.57 1800.41 -1003.98 -1494.49 0.95 5979522.35 617451.73 N 70.35277039 W 149.04628899 5313.24 44.17 235.63 4563.47 4625.29 1440.36 1897.68 1867.50 -1042.37 -1549.53 0.77 5979483.10 617397.31 N 70.35266549 W 149.04673579 5409.71 43.74 235.73 4632.92 4694.74 1492.30 1964.63 1934.46 -1080.12 -1604.83 0.45 5979444.47 617342.62 N 70.35256232 W 149.04718470 5505.37 45.59 235.49 4700.95 4762.77 1544.50 2031.88 2001.70 -1118.10 -1660.32 1.94 5979405.62 617287.74 N 70.35245853 W 149.04763513 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 2 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude I Depth Section Departure (II) (deg) (deg) (II) (II) (II) (II) (II) (II) (II) (deg/100 fI) (IIUS) (flUS) 5602.48 48.31 234.89 4767.24 4829.06 1599.92 2102.83 2072.65 -1158.61 -1718.57 2.84 5979364.19 617230.14 N 70.35234781 W 149.04810801 5697.64 51.38 233.90 4828.60 4890.42 1657.35 2175.55 2145.34 -1200.96 -1777.69 3.32 5979320.91 617171.71 N 70.35223208 W 149.04858789 5793.44 54.39 235.09 4886.40 4948.22 1717.57 2251.94 2221.70 -1245.31 -1839.88 3.29 5979275.59 617110.24 N 70.35211089 W 149.04909269 5889.06 57.95 233.06 4939.63 5001.45 1780.56 2331.35 2301.07 -1291.93 -1904.17 4.12 5979227.96 617046.70 N 70.35198349 W 149.04961454 MWD+IFR+MS 5985.53 61.01 230.89 4988.62 5050.44 1848.27 2414.45 2383.97 -1343.13 -1969.60 3.72 5979175.73 616982.10 N 70.35184357 W 149.05014567 Tie-In Survey 6079.45 65.32 228.53 5031.01 5092.83 1918.41 20224.54 2467.31 -1397.33 -2033.49 1.74 5979120.53 616919.09 N 70.35169545 W 149.05066419 Top Window (Blind) 6108.00 66.72 228.09 5042.61 5104.43 1940.59 20250.62 2493.19 -1414.68 -2052.96 5.10 5979102.87 616899.89 N 70.35164804 W 149.05082229 Base Window (Blind) 6120.00 68.58 227.58 5047.18 5109.00 1950.07 20261.72 2504.19 -1422.13 -2061.19 15.99 5979095.29 616891.78 N 70.35162768 W 149.05088905 Blind 6138.00 68.58 227.58 5053.75 5115.57 1964.43 20278.48 2520.79 -1433.43 -2073.56 0.00 5979083.80 616879.59 N 70.35159679 W 149.05098945 Blind ( Inc IAB+ Trend) 6150.44 71.83 227.70 5057.96 5119.78 1974.45 20290.18 2532.39 -1441.32 -2082.21 26.14 5979075.77 616871.07 N 70.35157524 W 149.05105964 Blind (Inc IAB+Trend) 6182.64 75.37 228.20 5067.05 5128.87 2000.81 20321.07 2563.02 -1462.00 -2105.14 11.09 5979054.73 616848.47 N 70.35151871 W 149.05124579 Blind (Inc IAB+Trend) 6214.86 79.31 229.00 5074.11 5135.93 2027.44 20352.50 2594.25 -1482.79 -2128.72 12.47 5979033.58 616825.23 N 70.35146191 W 149.0.5 Blind ( Inc IAB+ Trend) 6246.66 81.05 229.80 5079.54 5141.36 2053.76 20383.83 2625.42 -1503.18 -2152.51 6.01 5979012.81 616801.77 N 70.35140619 W 149.0 4 MWD 6278.79 82.19 230.68 5084.22 5146.04 2080.21 20415.62 2657.10 -1523.51 -2176.95 4.46 5978992.10 616777.66 N 70.35135063 W 149.05182857 MWD 6310.73 86.40 231.48 5087.39 5149.21 2106.38 20447.39 2688.80 -1543.47 -2201.67 13.41 5978971.75 616753.26 N 70.35129608 W 149.05202922 First MWD+IFR+MS 6342.35 87.99 230.96 5088.94 5150.76 2132.35 20478.97 2720.31 -1563.25 -2226.29 5.29 5978951.58 616728.96 N 70.35124203 W 149.05222904 6374.53 88.81 227.00 5089.84 5151.66 2159.49 20511.14 2752.30 -1584.36 -2250.55 12.56 5978930.09 616705.04 N 70.35118434 W 149.05242597 6406.60 92.23 225.75 5089.55 5151.37 2187.31 20543.20 2784.02 -1606.48 -2273.76 11.35 5978907.61 616682.18 N 70.35112389 W 149.05261434 6438.86 93.70 225.64 5087.88 5149.70 2215.44 20575.42 2815.84 -1628.98 -2296.82 4.57 5978884.75 616659.49 N 70.35106239 W 149.05280145 6468.38 96.37 223.07 5085.29 5147.11 2241.45 20604.82 2844.77 -1650.00 -2317.37 12.53 5978863.40 616639.27 N 70.35100495 W 149.05296827 6502.04 100.67 221.71 5080.30 5142.12 2271 .39 20638.10 2877.31 -1674.58 -2339.81 13.38 5978838.47 616617.23 N 70.35093778 W 149.05315037 6533.70 101.58 222.49 5074.19 5136.01 2299.42 20669.17 2907.67 -1697.63 -2360.64 3.76 5978815.10 616596.77 N 70.35087480 W 149.05331938 6565.97 100.82 220.73 5067.92 5129.74 2328.09 20700.82 2938.56 -1721.30 -2381.65 5.85 5978791.10 616576.13 N 70.35081012 W 149.05348996 6598.45 98.52 219.01 5062.47 5124.29 2357.49 20732.84 2969.60 -1745.87 -2402.18 8.80 5978766.21 616556.01 N 70.35074297 W 149.05365649 6629.06 96.71 216.76 5058.41 5120.23 2385.75 20763.18 2998.76 -1769.81 -2420.80 9.38 5978741.97 616537.76 N 70.35067754 W 149.05380766 6659.75 94.06 213.83 5055.53 5117.35 2414.67 20793.73 3027.73 -1794.75 -2438.45 12.84 5978716.77 616520.51 N 70.35060941 W 149.05395087 6690.19 92.72 211.66 5053.73 5115.55 2443.85 20824.11 3056.14 -1820.30 -2454.89 8.37 5978690.95 616504.49 N 70.35053958 W 149.05408421 6722.07 92.79 209.78 5052.20 5114.02 2474.72 20855.96 3085.53 -1847.68 -2471.15 5.89 5978663.33 616488.66 N 70.35046478 W 149.05421619 6754.46 93.00 208.34 5050.56 5112.38 2506.30 20888.31 3115.08 -1875.95 -2486.87 4.49 5978634.81 616473.40 N 70.35038752 W 149..66 6784.69 93.27 205.71 5048.91 5110.73 2535.98 20918.49 3142.24 -1902.84 -2500.58 8.73 5978607.71 616460.11 N 70.35031406 W 149. 92 6816.88 92.11 202.50 5047.40 5109.22 2567.85 20950.65 3170.50 -1932.18 -2513.71 10.59 5978578.16 616447.45 N 70.35023388 W 149. 143 6848.95 91.45 198.89 5046.40 5108.22 2599.81 20982.70 3197.80 -1962.17 -2525.04 11.44 5978548.01 616436.61 N 70.35015196 W 149.05465329 6881.60 91.15 196.22 5045.66 5107.48 2632.45 21015.34 3224.72 -1993.28 -2534.88 8.23 5978516.74 616427.26 N 70.35006694 W 149.05473312 6912.65 92.07 192.41 5044.79 5106.61 2663.45 21046.38 3249.39 -2023.35 -2542.55 12.62 5978486.56 616420.06 N 70.34998479 W 149.05479532 6944.79 92.14 192.20 5043.61 5105.43 2695.48 21078.50 3274.35 -2054.73 -2549.40 0.69 5978455.07 616413.72 N 70.34989905 W 149.05485080 6977.36 91.83 191.15 5042.48 5104.30 2727.92 21111.05 3299.55 -2086.61 -2555.99 3.36 5978423.10 616407.64 N 70.34981196 W 149.05490418 7008.85 92.83 190.97 5041.20 5103.02 2759.24 21142.51 3323.81 -2117.49 -2562.02 3.23 5978392.13 616402.09 N 70.34972760 W 149.05495310 7041.24 96.89 190.14 5038.46 5100.28 2791.33 21174.78 3348.64 -2149.21 -2567.93 12.79 5978360.32 616396.69 N 70.34964093 W 149.05500099 7073.30 97.79 189.70 5034.36 5096.18 2822.91 21206.57 3373.00 -2180.53 -2573.41 3.12 5978328.92 616391.71 N 70.34955536 W 149.05504537 7105.18 97.75 188.84 5030.05 5091.87 2854.25 21238.16 3397.10 -2211.70 -2578.50 2.68 5978297.67 616387.12 N 70.34947019 W 149.05508659 7137.41 97.86 189.18 5025.67 5087.49 2885.90 21270.09 3421.49 -2243.24 -2583.50 1.10 5978266.06 616382.62 N 70.34938403 W 149.05512710 7169.85 97.72 190.62 5021.28 5083.10 2917.83 21302.23 3446.48 -2274.90 -2589.03 4.42 5978234.32 616377.60 N 70.34929753 W 149.05517186 7200.90 97.58 189.79 5017.14 5078.96 2948.41 21333.01 3470.62 -2305.19 -2594.48 2.69 5978203.95 616372.63 N 70.34921478 W 149.05521604 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 3 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude r Depth Section Departure (II) (deg) (deg) (II) (II) ( II) (II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS) 7233.68 95.47 188.81 5013.42 5075.24 2980.72 21365.57 3495.96 -2337.33 -2599.74 7.09 5978171.74 616367.87 N 70.34912698 W 149.05525866 7266.09 92.35 189.31 5011.21 5073.03 3012.77 21397.90 3521.15 -2369.25 -2604.83 9.75 5978139.74 616363.29 N 70.34903976 W 149.05529990 7297.76 91.87 190.78 5010.04 5071.86 3044.22 21429.55 3546.26 -2400.42 -2610.35 4.88 5978108.50 616358.27 N 70.34895462 W 149.05534462 7329.43 92.00 189.67 5008.97 5070.79 3075.68 21461.20 3571.53 -2431.57 -2615.97 3.53 5978077.26 616353.14 N 70.34886952 W 149.05539014 7361.41 91.42 190.44 5008.02 5069.84 3107.44 21493.17 3597.10 -2463.04 -2621.55 3.01 5978045.71 616348.06 N 70.34878352 W 149.05543535 7393.80 90.73 189.47 5007.41 5069.23 3139.61 21525.55 3623.07 -2494.94 -2627.15 3.67 5978013.73 616342.97 N 70.34869638 W 149.05548070 7425.82 90.22 188.59 5007.14 5068.96 3171.35 21557.57 3648.54 -2526.56 -2632.17 3.18 5977982.03 616338.45 N 70.34860999 W 149.05552141 7457.86 88.61 191.98 5007.47 5069.29 3203.19 21589.61 3674.54 -2558.08 -2637.89 11.71 5977950.43 616333.23 N 70.34852388 W 149.05556774 7489.42 88.33 193.64 5008.31 5070.13 3234.67 21621.16 3701.02 -2588.84 -2644.89 5.33 5977919.57 616326.73 N 70.34843983 W 149.05562443 7521.64 91.15 195.96 5008.46 5070.28 3266.87 21653.38 3728.72 -2619.98 -2653.12 11.33 5977888.30 616319.00 N 70.34835474 W 149.05569114 7554.02 93.65 199.17 5007.10 5068.92 3299.21 21685.72 3757.36 -2650.82 -2662.88 12.56 5977857.31 616309.73 N 70.34827049 W 149.0.7 7585.90 93.48 201.10 5005.12 5066.94 3330.97 21717.54 3786.22 -2680.69 -2673.83 6.07 5977827.27 616299.25 N 70.34818887 W 149.0 9 7618.48 94.44 201 .43 5002.87 5064.69 3363.36 21750.04 3816.01 -2710.98 -2685.62 3.12 5977796.80 616287.95 N 70.34810611 W 149.05 68 7650.40 95.78 201.59 5000.03 5061.85 3395.03 21781.84 3845.25 -2740.56 -2697.27 4.23 5977767.04 616276.76 N 70.34802529 W 149.05604922 7681.96 94.72 201.50 4997.14 5058.96 3426.34 21813.26 3874.20 -2769.79 -2708.82 3.37 5977737.64 616265.69 N 70.34794542 W 149.05614281 7714.43 93.41 202.55 4994.84 5056.66 3458.58 21845.65 3904.18 -2799.81 -2720.96 5.17 5977707.43 616254.02 N 70.34786339 W 149.05624131 7745.65 92.24 200.95 4993.30 5055.12 3489.63 21876.83 3933.02 -2828.78 -2732.52 6.34 5977678.29 616242.93 N 70.34778426 W 149.05633501 7777.89 89.91 201.71 4992.70 5054.52 3521.75 21909.07 3962.77 -2858.80 -2744.24 7.60 5977648.08 616231.68 N 70.34770223 W 149.05643008 7810.83 89.77 201.74 4992.79 5054.61 3554.55 21942.00 3993.31 -2889.40 -2756.43 0.43 5977617.30 616219.98 N 70.34761862 W 149.05652896 7842.55 90.53 200.90 4992.71 5054.53 3586.16 21973.72 4022.67 -2918.95 -2767.96 3.57 5977587.57 616208.92 N 70.34753788 W 149.05662248 7874.28 90.67 200.98 4992.37 5054.19 3617.80 22005.45 4051.99 -2948.58 -2779.30 0.51 5977557.77 616198.05 N 70.34745692 W 149.05671443 7906.85 91.04 198.91 4991.89 5053.71 3650.30 22038.02 4081.91 -2979.19 -2790.41 6.46 5977526.98 616187.43 N 70.34737328 W 149.05680450 7937.02 88.85 198.37 4991.92 5053.74 3680.45 22068.19 4109.38 -3007.78 -2800.05 7.48 5977498.25 616178.24 N 70.34729517 W 149.05688268 7969.17 87.82 197.70 4992.85 5054.67 3712.58 22100.32 4138.55 -3038.33 -2810.00 3.82 5977467.54 616168.78 N 70.34721168 W 149.05696334 8001.36 88.50 195.87 4993.88 5055.70 3744.75 22132.50 4167.50 -3069.14 -2819.29 6.06 5977436.60 616159.98 N 70.34712753 W 149.05703865 8033.59 88.74 193.70 4994.66 5056.48 3776.95 22164.72 4196.03 -3100.29 -2827.52 6.77 5977405.33 616152.26 N 70.34704242 W 149.05710529 8065.20 89.19 190.43 4995.23 5057.05 3808.46 22196.32 4223.34 -3131.19 -2834.12 10.44 5977374.32 616146.14 N 70.34695799 W 149.05715881 8097.62 90.22 187.55 4995.40 5057.22 3840.59 22228.74 4250.51 -3163.21 -2839.19 9.43 5977342.23 616141.59 N 70.34687051 W 149.05719982 8129.55 90.97 185.69 4995.07 5056.89 3872.04 22260.67 4276.61 -3194.92 -2842.87 6.28 5977310.47 616138.41 N 70.34678387 W 149..60 8160.69 91.80 185.95 4994.31 5056.13 3902.63 22291.80 4301.89 -3225.89 -2846.02 2.79 5977279.45 616135.75 N 70.34669926 W 149. 12 8194.13 91.93 183.21 4993.23 5055.05 3935.32 22325.22 4328.68 -3259.20 -2848.69 8.20 5977246.11 616133.61 N 70.34660825 W 149.05727668 8225.94 91.80 182.51 4992.19 5054.01 3966.21 22357.02 4353.68 -3290.96 -2850.28 2.24 5977214.33 616132.53 N 70.34652150 W 149.05728946 8256.46 91.52 181.64 4991.31 5053.13 3995.75 22387.52 4377.49 -3321.44 -2851.38 2.99 5977183.84 616131.91 N 70.34643821 W 149.05729833 8289.35 91.45 180.55 4990.45 5052.27 4027.44 22420.40 4402.89 -3354.32 -2852.01 3.32 5977150.96 616131.80 N 70.34634841 W 149.05730333 8321.05 91.93 177.16 4989.52 5051.34 4057.63 22452.09 4426.66 -3385.99 -2851.38 10.80 5977119.30 616132.93 N 70.34626187 W 149.05729809 8352.54 92.28 179.57 4988.36 5050.18 4087.52 22483.56 4450.19 -3417.45 -2850.48 7.73 5977087.87 616134.33 N 70.34617595 W 149.05729071 8385.04 91.80 180.08 4987.20 5049.02 4118.63 22516.04 4475.12 -3449.92 -2850.38 2.15 5977055.40 616134.95 N 70.34608722 W 149.05728980 8417.19 91.32 179.87 4986.33 5048.15 4149.44 22548.17 4499.93 -3482.06 -2850.37 1.63 5977023.27 616135.47 N 70.34599942 W 149.05728959 8449.25 91.32 178.98 4985.59 5047.41 4180.07 22580.22 4524.57 -3514.11 -2850.05 2.78 5976991.23 616136.30 N 70.34591186 W 149.05728688 8481 .49 91.01 180.07 4984.94 5046.76 4210.89 22612.46 4549.48 -3546.34 -2849.78 3.51 5976959.01 616137.08 N 70.34582381 W 149.05728461 8513.50 90.94 179.71 4984.39 5046.21 4241.55 22644.46 4574.44 -3578.35 -2849.72 1.15 5976927.01 616137.65 N 70.34573637 W 149.05728401 8545.30 90.60 179.89 4983.96 5045.78 4272.00 22676.26 4599.28 -3610.15 -2849.61 1.21 5976895.22 616138.27 N 70.34564951 W 149.05728301 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3f712005 1 :01 PM Page 4 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude r Depth Section Departure (It) ( deg) (deg) (It) (II) (II) (II) (It) (II) (It) (deg/100 II) (ltUS) (IIUS) 8577.72 91.01 179.03 4983.51 5045.33 4302.99 22708.68 4624.58 -3642.56 -2849.30 2.94 5976862.82 616139.09 N 70.34556095 W 149.05728043 8609.74 90.73 178.89 4983.02 5044.84 4333.51 22740.69 4649.48 -3674.57 -2848.72 0.98 5976830.83 616140.17 N 70.34547350 W 149.05727562 8641.86 90.91 178.44 4982.56 5044.38 4364.08 22772.81 4674.44 -3706.68 -2847.97 1.51 5976798.74 616141.43 N 70.34538578 W 149.05726945 8674.80 90.97 179.59 4982.02 5043.84 4395.48 22805.75 4700.26 -3739.61 -2847.41 3.50 5976765.82 616142.52 N 70.34529582 W 149.05726475 8706.84 91.80 177.01 4981.25 5043.07 4425.90 22837.78 4725.19 -3771.62 - 2846.46 8.46 5976733.83 616143.98 N 70.34520837 W 149.05725694 8738.52 92.38 177.90 4980.09 5041.91 4455.82 22869.43 4749.63 -3803.25 -2845.05 3.35 5976702.23 616145.89 N 70.34512197 W 149.05724543 8771.04 92.38 177.97 4978.74 5040.56 4486.61 22901.93 4774.98 -3835.72 -2843.88 0.22 5976669.79 616147.57 N 70.34503326 W 149.05723583 8802.98 91.04 177.92 4977.79 5039.61 4516.87 22933.85 4799.97 -3867.63 -2842.73 4.20 5976637.91 616149.22 N 70.34494610 W 149.05722644 8834.85 90.70 176.87 4977.30 5039.12 4546.97 22965.72 4824.80 -3899.46 -2841.29 3.46 5976606.10 616151.18 N 70.34485914 W 149.05721459 8867.43 90.77 178.02 4976.89 5038.71 4577.76 22998.30 4850.29 -3932.00 -2839.83 3.54 5976573.59 616153.15 N 70.34477023 W 149.05720270 8899.58 90.60 176.95 4976.50 5038.32 4608.14 23030.44 4875.54 -3964.12 -2838.42 3.37 5976541.50 616155.07 N 70.34468249 W 149.05719115 8931.45 90.90 177.73 4976.08 5037.90 4638.24 23062.31 4900.60 -3995.95 -2836.94 2.62 5976509.70 616157.05 N 70.34459553 W 149.0.5 8963.82 90.29 176.97 4975.75 5037.57 4668.81 23094.68 4926.14 -4028.29 -2835.45 3.01 5976477.40 616159.06 N 70.34450720 W 149.0 1 8995.67 89.02 179.89 4975.94 5037.76 4699.08 23126.53 4951.70 -4060.12 -2834.58 10.00 5976445.59 616160.44 N 70.34442024 W 149.05715963 9027.75 89.26 179.27 4976.42 5038.24 4729.76 23158.60 4977.90 -4092.19 -2834.34 2.07 5976413.52 616161.18 N 70.34433261 W 149.05715762 9059.92 89.77 181.82 4976.69 5038.51 4760.68 23190.77 5004.55 -4124.36 -2834.65 8.08 5976381.36 616161.39 N 70.34424474 W 149.05716001 9092.28 90.19 182.92 4976.71 5038.53 4792.05 23223.13 5031.99 -4156.69 -2835.98 3.64 5976349.01 616160.56 N 70.34415641 W 149.05717077 9124.46 90.46 182.08 4976.52 5038.34 4823.27 23255.31 5059.36 -4188.84 -2837.39 2.74 5976316.85 616159.67 N 70.34406858 W 149.05718206 9156.22 90.01 182.23 4976.39 5038.21 4854.03 23287.07 5086.34 -4220.58 -2838.58 1.49 5976285.10 616158.98 N 70.34398188 W 149.05719165 9188.52 89.84 182.80 4976.43 5038.25 4885.37 23319.37 5113.93 -4252.84 -2840.00 1.84 5976252.81 616158.07 N 70.34389372 W 149.05720306 9219.76 89.91 181.77 4976.50 5038.32 4915.65 23350.61 5140.61 -4284.06 -2841.24 3.30 5976221.59 616157.32 N 70.34380844 W 149.05721307 9252.17 89.91 181.91 4976.55 5038.37 4947.00 23383.02 5168.21 -4316.45 -2842.29 0.43 5976189.18 616156.80 N 70.34371995 W 149.05722141 9282.98 89.84 182.31 4976.62 5038.44 4976.84 23413.83 5194.57 -4347.24 -2843.42 1.32 5976158.38 616156.15 N 70.34363583 W 149.05723052 9313.66 89.09 181.27 4976.91 5038.73 5006.50 23444.51 5220.78 -4377.91 -2844.38 4.18 5976127.71 616155.68 N 70.34355206 W 149.05723821 9340.22 88.71 182.24 4977.42 5039.24 5032.18 23471.06 5243.50 -4404.45 -2845.19 3.92 5976101.16 616155.29 N 70.34347955 W 149.05724472 9375.15 89.16 180.79 4978.07 5039.89 5065.91 23505.99 5273.35 -4439.36 -2846.11 4.35 5976066.24 616154.92 N 70.34338417 W 149.05725211 9405.18 87.96 180.62 4978.82 5040.64 5094.79 23536.01 5298.85 -4469.38 -2846.48 4.04 5976036.23 616155.03 N 70.34330217 W 149.05725501 9436.08 87.95 180.46 4979.92 5041.74 5124.47 23566.89 5325.07 -4500.25 -2846.78 0.52 5976005.35 616155.23 N 70.34321781 W 149.05725728 9466.74 86.79 180.31 4981.33 5043.15 5153.89 23597.52 5351.09 -4530.88 -2846.98 3.81 5975974.73 616155.51 N 70.34313414 W 149..86 9498.04 86.51 182.37 4983.16 5044.98 5184.04 23628.76 5377.95 -4562.12 -2847.71 6.63 5975943.48 616155.27 N 70.34304881 W 149. 69 9528.45 88.13 182.38 4984.58 5046.40 5213.49 23659.14 5404.39 -4592.47 -2848.97 5.33 5975913.12 616154.50 N 70.34296589 W 149. 481 9559.69 88.78 183.96 4985.42 5047.24 5243.88 23690.37 5431.81 -4623.65 -2850.70 5.47 5975881.92 616153.26 N 70.34288071 W 149.05728873 9590.16 88.51 183.62 4986.14 5047.96 5273.59 23720.83 5458.76 -4654.04 -2852.71 1.42 5975851.50 616151.73 N 70.34279767 W 149.05730497 9621.40 88.23 184.49 4987.03 5048.85 5304.07 23752.06 5486.49 -4685.19 -2854.92 2.92 5975820.32 616150.02 N 70.34271257 W 149.05732279 9652.71 89.94 184.31 4987.53 5049.35 5334.68 23783.36 5514.41 -4716.40 -2857.32 5.49 5975789.08 616148.11 N 70.34262730 W 149.05734219 9683.01 90.05 183.94 4987.54 5049.36 5364.27 23813.66 5541.41 -4746.62 -2859.50 1.27 5975758.83 616146.41 N 70.34254474 W 149.05735978 9713.96 89.91 184.63 4987.55 5049.37 5394.51 23844.61 5569.05 -4777 .49 -2861.81 2.27 5975727.94 616144.59 N 70.34246042 W 149.05737845 9744.82 89.81 184.76 4987.62 5049.44 5424.72 23875.47 5596.75 -4808.24 -2864.34 0.53 5975697.15 616142.56 N 70.34237639 W 149.05739885 9775.44 90.22 185.53 4987.61 5049.43 5454.73 23906.09 5624.37 -4838.74 -2867.08 2.85 5975666.61 616140.29 N 70.34229308 W 149.05742104 9806.19 89.77 185.26 4987.62 5049.44 5484.90 23936.84 5652.20 -4869.35 -2869.98 1.71 5975635.96 616137.89 N 70.34220944 W 149.05744440 9836.19 90.49 184.94 4987.55 5049.37 5514.31 23966.84 5679.31 -4899.24 -2872.64 2.63 5975606.04 616135.70 N 70.34212780 W 149.05746595 9867.07 91.35 184.07 4987.05 5048.87 5544.50 23997.72 5707.11 -4930.02 -2875.07 3.96 5975575.23 616133.76 N 70.34204371 W 149.05748553 9897.95 91.32 183.01 4986.33 5048.15 5574.58 24028.59 5734.70 -4960.83 -2876.97 3.43 5975544.39 616132.35 N 70.34195953 W 149.05750091 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Sld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 5 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) (II) (II) (II) (II) (II) (II) (deg/100 II) (ftUS) (IIUS) 9929.20 91.08 180.74 4985.68 5047.50 5604.81 24059.83 5762.24 -4992.05 -2878.00 7.30 5975513.16 616131.82 N 70.34187423 W 149.05750910 9959.60 90.87 181.02 4985.16 5046.98 5634.07 24090.23 5788.82 -5022.44 -2878.46 1.15 5975482.77 616131.83 N 70.34179120 W 149.05751280 9990.64 89.19 179.00 4985.15 5046.97 5663.83 24121.26 5815.78 -5053.48 -2878.47 8.46 5975451.74 616132.32 N 70.34170641 W 149.05751274 10022.57 89.26 178.60 4985.58 5047.40 5694.24 24153.19 5843.20 -5085.40 -2877.80 1.27 5975419.83 616133.50 N 70.34161921 W 149.05750722 10054.74 89.67 178.69 4985.88 5047.70 5724.85 24185.36 5870.84 -5117.56 -2877.04 1.30 5975387.69 616134.77 N 70.34153135 W 149.05750094 10087.10 89.67 179.71 4986.06 5047.88 5755.74 24217.72 5898.85 -5149.92 -2876.59 3.15 5975355.35 616135.73 N 70.34144296 W 149.05749718 10118.28 89.88 178.56 4986.19 5048.01 5785.49 24248.90 5925.86 -5181.09 -2876.12 3.75 5975324.19 616136.70 N 70.34135779 W 149.05749326 10151.06 89.36 177.38 4986.40 5048.22 5816.56 24281.68 5953.96 -5213.85 -2874.96 3.93 5975291.46 616138.38 N 70.34126830 W 149.05748374 10182.44 86.89 176.19 4987.43 5049.25 5846.08 24313.04 5980.55 -5245.16 -2873.20 8.74 5975260.18 616140.63 N 70.34118276 W 149.05746937 10215.15 86.34 175.59 4989.36 5051.18 5876.63 24345.69 6008.02 -5277.73 -2870.86 2.49 5975227.66 616143.49 N 70.34109379 W 149.05745028 10246.72 86.41 175.42 4991.36 5053.18 5906.04 24377.20 6034.45 -5309.14 -2868.39 0.58 5975196.29 616146.46 N 70.34100799 W 149.0.4 10278.77 87.10 173.18 4993.17 5054.99 5935.65 24409.20 6060.98 -5340.98 -2865.21 7.30 5975164.51 616150.14 N 70.34092101 W 149.0 6 10310.79 88.61 173.46 4994.37 5056.19 5965.06 24441.19 6087.25 -5372.76 -2861.49 4.80 5975132.80 616154.37 N 70.34083420 W 149.05 96 10342.87 90.60 175.73 4994.59 5056.41 5994.81 24473.27 6114.04 -5404.69 -2858.47 9.41 5975100.92 616157.90 N 70.34074696 W 149.05734934 10374.76 88.23 175.28 4994.92 5056.74 6024.57 24505.16 6141.00 -5436.48 -2855.97 7.56 5975069.18 616160.90 N 70.34066012 W 149.05732897 10406.65 86.96 173.75 4996.26 5058.08 6054.11 24537.02 6167.68 -5468.19 -2852.92 6.23 5975037.52 616164.45 N 70.34057348 W 149.05730416 10437.86 85.96 171.21 4998.18 5060.00 6082.55 24568.17 6193.20 -5499.07 -2848.85 8.73 5975006.71 616169.01 N 70.34048913 W 149.05727099 10470.16 86.27 168.54 5000.37 5062.19 6111.35 24600.40 6218.79 -5530.79 -2843.18 8.30 5974975.09 616175.18 N 70.34040247 W 149.05722493 10502.30 86.44 168.42 5002.42 5064.24 6139.65 24632.47 6243.84 -5562.22 -2836.78 0.65 5974943.77 616182.08 N 70.34031662 W 149.05717286 10534.35 86.44 163.62 5004.41 5066.23 6167.20 24664.46 6268.01 -5593.25 -2829.05 14.95 5974912.86 616190.30 N 70.34023185 W 149.05711008 10566.59 86.03 160.47 5006.52 5068.34 6193.71 24696.63 6290.89 -5623.85 -2819.13 9.83 5974882.43 616200.70 N 70.34014827 W 149.05702953 10598.64 88.95 162.39 5007.93 5069.75 6219.90 24728.64 6313.49 -5654.20 -2808.94 10.90 5974852.25 616211.37 N 70.34006537 W 149.05694672 10630.90 90.25 161.48 5008.15 5069.97 6246.45 24760.90 6336.54 -5684.87 -2798.94 4.92 5974821.75 616221.86 N 70.33998160 W 149.05686546 10663.30 92.55 159.88 5007.36 5069.18 6272.70 24793.29 6359.27 -5715.43 -2788.22 8.65 5974791.36 616233.06 N 70.33989811 W 149.05677843 10693.96 92.59 158.32 5005.99 5067.81 6297.02 24823.92 6380.24 -5744.04 -2777.29 5.08 5974762.93 616244.44 N 70.33981996 W 149.05668969 10725.88 93.48 155.92 5004.30 5066.12 6321.64 24855.79 6401.32 -5773.41 -2764.90 8.01 5974733.76 616257.29 N 70.33973975 W 149.05658905 10758.97 92.96 151.44 5002.44 5064.26 6345.85 24888.83 6421.75 -5803.01 -2750.26 13.61 5974704.40 616272.40 N 70.33965888 W 149.05647014 10790.66 93.20 149.81 5000.73 5062.55 6367.86 24920.48 6440.07 -5830.59 -2734.74 5.19 5974677.07 616288.36 N 70.33958357 W 149.05634412 10822.56 92.55 152.66 4999.13 5060.95 6390.27 24952.34 6458.90 -5858.51 -2719.41 9.15 5974649.40 616304.13 N 70.33950729 W 149..66 10854.65 90.80 149.15 4998.20 5060.02 6412.69 24984.41 6477.80 -5886.54 -2703.81 12.22 5974621.63 616320.17 N 70.33943075 W 149. 04 10886.67 89.29 147.09 4998.17 5059.99 6433.94 25016.43 6495.51 -5913.73 -2686.90 7.98 5974594.72 616337.50 N 70.33935649 W 149.05595577 10918.44 88.81 148.37 4998.70 5060.52 6454.86 25048.20 6513.00 -5940.58 -2669.94 4.30 5974568.13 616354.89 N 70.33928313 W 149.05581808 10948.42 88.78 148.32 4999.33 5061.15 6474.84 25078.17 6529.87 -5966.10 -2654.21 0.19 5974542.87 616371.02 N 70.33921345 W 149.05569038 10981.62 89.22 149.86 4999.91 5061.73 6497.29 25111.36 6549.01 -5994.58 -2637.16 4.82 5974514.67 616388.52 N 70.33913566 W 149.05555196 11013.54 89.60 150.61 5000.24 5062.06 6519.34 25143.28 6568.04 -6022.28 -2621.32 2.63 5974487.22 616404.80 N 70.33905998 W 149.05542331 11044.78 89.70 151.74 5000.43 5062.25 6541.29 25174.52 6587.17 -6049.65 -2606.25 3.63 5974460.10 616420.29 N 70.33898523 W 149.05530104 11078.32 90.22 151.73 5000.45 5062.27 6565.08 25208.06 6608.07 -6079.19 -2590.37 1.55 5974430.81 616436.64 N 70.33890454 W 149.05517209 11109.30 89.60 151.50 5000.50 5062.32 6587.02 25239.04 6627.42 -6106.45 -2575.64 2.13 5974403.80 616451.80 N 70.33883010 W 149.05505252 11140.35 91.25 152.08 5000.27 5062.09 6609.07 25270.09 6646.97 -6133.81 -2560.97 5.63 5974376.68 616466.90 N 70.33875537 W 149.05493337 11173.00 91.11 150.01 4999.60 5061.42 6631.95 25302.73 6667.28 -6162.37 -2545.17 6.35 5974348.37 616483.16 N 70.33867735 W 149.05480508 11204.30 90.43 150.59 4999.18 5061.00 6653.59 25334.03 6686.54 -6189.56 -2529.66 2.86 5974321.44 616499.09 N 70.33860310 W 149.05467920 11236.17 90.49 151.58 4998.92 5060.74 6675.95 25365.90 6706.58 -6217.45 -2514.25 3.11 5974293.79 616514.94 N 70.33852691 W 149.05455410 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Sld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 6 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude I Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) ( It) (It) (It) (deg/100 It) (ltUS) (ltUS) 11269.91 90.84 150.52 4998.53 5060.35 6699.60 25399.64 6727.87 -6246.97 -2497.92 3.31 5974264.54 616531.74 N 70.33844627 W 149.05442153 11301.29 90.46 150.96 4998.17 5059.99 6721.48 25431.01 6747.64 -6274.35 -2482.58 1.85 5974237.41 616547.50 N 70.33837150 W 149.05429703 11332.36 89.77 150.55 4998.11 5059.93 6743.14 25462.08 6767.31 -6301 .46 -2467.40 2.58 5974210.55 616563.11 N 70.33829745 W 149.05417380 11365.80 89.98 148.46 4998.18 5060.00 6765.93 25495.52 6788.00 -6330.27 -2450.44 6.28 5974182.01 616580.53 N 70.33821875 W 149.05403606 11397.08 90.15 147.97 4998.15 5059.97 6786.73 25526.80 6806.89 -6356.86 -2433.96 1.66 5974155.69 616597.43 N 70.33814613 W 149.05390232 11429.70 89.36 148.18 4998.29 5060.11 6808.36 25559.42 6826.63 -6384.54 -2416.71 2.51 5974128.29 616615.11 N 70.33807051 W 149.05376230 11461.72 89.05 146.70 4998.73 5060.55 6829.32 25591.44 6845.82 -6411.53 -2399.48 4.72 5974101.58 616632.77 N 70.33799681 W 149.05362243 11494.10 88.57 145.16 4999.40 5061.22 6849.86 25623.81 6864.62 -6438.34 -2381.34 4.98 5974075.06 616651.32 N 70.33792357 W 149.05347524 11525.92 87.68 147.08 5000.44 5062.26 6870.13 25655.62 6883.28 -6464.74 -2363.62 6.65 5974048.95 616669.47 N 70.33785146 W 149.05333134 11557.85 88.30 145.64 5001.56 5063.38 6890.56 25687.53 6902.21 -6491.31 -2345.94 4.91 5974022.67 616687.56 N 70.33777890 W 149.05318786 11590.36 88.95 145.90 5002.34 5064.16 6911.12 25720.03 6921.32 -6518.18 -2327.66 2.15 5973996.09 616706.27 N 70.33770550 W 149.05303947 11621.43 88.23 147.11 5003.11 5064.93 6931.07 25751.09 6939.99 -6544.08 -2310.52 4.53 5973970.47 616723.81 N 70.33763476 W 149.0.4 11653.24 88.68 146.85 5003.97 5065.79 6951.69 25782.89 6959.41 -6570.75 -2293.19 1.63 5973944.08 616741.56 N 70.33756193 W 149.0 9 11685.94 89.43 148.50 5004.51 5066.33 6973.20 25815.58 6979.78 -6598.37 -2275.71 5.54 5973916.74 616759.48 N 70.33748647 W 149.05261779 11717.10 90.56 148.99 5004.51 5066.33 6994.13 25846.74 6999.73 -6625.01 -2259.54 3.95 5973890.37 616776.07 N 70.33741371 W 149.05248657 11748.70 89.64 147.74 5004.45 5066.27 7015.20 25878.34 7019.89 -6651.91 -2242.97 4.91 5973863.73 616793.06 N 70.33734023 W 149.05235204 11780.95 88.71 147.42 5004.92 5066.74 7036.38 25910.59 7040.20 -6679.13 -2225.68 3.05 5973836.79 616810.78 N 70.33726588 W 149.05221172 11813.45 89.70 147.59 5005.37 5067.19 7057.68 25943.08 7060.73 -6706.54 -2208.22 3.09 5973809.66 616828.67 N 70.33719101 W 149.05207003 11845.57 90.12 147.60 5005.42 5067.24 7078.78 25975.20 7081.15 -6733.66 -2191.01 1.31 5973782.83 616846.31 N 70.33711694 W 149.05193031 11877.41 89.16 149.04 5005.62 5067.44 7099.99 26007.04 7101.78 -6760.76 -2174.29 5.44 5973756.00 616863.46 N 70.33704294 W 149.05179460 11910.10 89.46 148.35 5006.01 5067.83 7121.93 26039.73 7123.21 -6788.68 -2157.30 2.30 5973728.35 616880.88 N 70.33696666 W 149.05165675 11942.35 89.60 149.62 5006.28 5068.10 7143.69 26071.98 7144.56 -6816.32 -2140.69 3.96 5973700.98 616897.93 N 70.33689116 W 149.05152188 11973.71 88.92 150.49 5006.68 5068.50 7165.28 26103.33 7165.83 -6843.49 -2125.03 3.52 5973674.07 616914.01 N 70.33681695 W 149.05139484 12006.09 89.09 148.50 5007.24 5069.06 7187.34 26135.71 7187.64 -6871 .38 -2108.60 6.17 5973646.44 616930.88 N 70.33674076 W 149.05126146 Last MWD+IFR+MS 12041.37 90.05 148.53 5007.51 5069.33 7210.94 26170.99 7211.04 -6901.47 -2090.18 2.72 5973616.65 616949.78 N 70.33665858 W 149.05111191 TO ( Projected) 12100 90.05 148.53 5007.46 5069.28 7250.16 26229.62 7250.16 -6951.48 -2059.57 0 5973567.14 616981.18 N 70.33652200 W 149.05086350 Survey Type: Definitive Survey NOTES: MWD + IFR : AK - ( MWD + IFR [Alaska] -- In-field referenced MWD in Alaska. Model takes account of increased violence of magnetic field disturbances in Alaska. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) . MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Leqal Description: Northinq (V) rHUS] Eastinq (X) rHUS] Surface: 4346 FSL 4500 FEL S35 T12N R12E UM 5980549.84 618929.96 Tie-In: 4346 FSL 4500 FEL S35 T12N R12E UM 5980549.89 618929.86 BHL: 2674 FSL 1289 FEL 83 T11 N R12E UM 5973567.14 616981.18 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\8-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 7 of 7 SCHLUMBERGER Survey report Client.... ............. ..: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . . .: Polaris Well. . . . . . . . . . . . . . . . . . . . .: S-213AL2 API number..... ..........: 50-029-22993-62 Engineer.................: St. Amour Rig:.....................: Doyon 16 STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions... ..: Minimum curvature Method for DLS. ..........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference.... ......: Driller's Pipe tally GL above permanent..... ..: 35.90 ft KB above permanent... ....: N/A Top Drive ft DF above permanent..... ..: 61.82 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-) .... ....: -999.25 ft Azimuth from rotary table to target: 237.40 degrees [(c)2005 IDEAL ID8_1C_02J 8-Feb-2005 17:45:02 Spud date................: Last survey date.........: Total accepted surveys...: MD of first survey.......: MD of last survey........: Page 1 of 10 23-Nov-04 08-Feb-05 263 0.00 ft 12100.00 ft . ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2004 Magnetic date............: 03-Jan-2005 Magnetic field strength..: 1152.29 HCNT Magnetic dec (+E/W-).....: 24.78 degrees Magnetic dip.............: 80.85 degrees ----- MWD survey Reference Reference G... ...........: Reference H. . . . . . . . . . . . . . : Reference Dip...... ......: Tolerance of G......... ..: Tolerance of H...........: Tolerance of Dip.. .......: Criteria --------- 1002.68 mGal 1152.29 HCNT 80.85 degrees (+/-) 2.50 mGal (+/-) 6.00 HCNT (+/-) 0.45 degrees . ----- Corrections --------------------------- Magnetic dec (+E/W-)... ..: 24.78 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.78 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction ~ DL/-~¿~ SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 Page 2 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 1 2 3 4 5 0.00 155.42 233.49 327.03 415.75 6 7 8 9 10 509.99 602.31 694.94 787.96 883.26 11 12 13 14 15 976.53 1069.16 1160.63 1253.35 1347.39 16 17 18 19 20 1439.53 1534.40 1630.00 1723.15 1814.13 21 22 23 24 25 1863.71 1907.37 2000.61 2095.16 2187.42 26 27 28 29 30 2282.02 2375.30 2469.73 2503.22 2532.82 0.00 0.08 0.19 0.28 0.46 0.27 0.35 0.40 0.15 0.36 0.43 0.53 0.56 0.77 1. 25 1. 80 1. 41 0.74 2.46 6.28 6.40 6.39 6.09 5.63 5.36 5.13 7.07 12.17 14.39 15.76 297.52 297.52 189.70 217.18 188.45 140.23 13 6.82 110.75 142.58 98.80 98.44 98.28 78.60 70.45 70.29 76.02 74.91 66.98 259.23 254.60 256.71 253.07 240.31 239.01 237.61 235.24 239.64 244.54 244.19 243.38 [(c)2005 IDEAL ID8_1C_02] 0.00 155.42 78.07 93.54 88.72 94.24 92 .32 92.63 93.02 95.30 93.27 92.63 91.47 92.72 94.04 92.14 94.87 95.60 93.15 90.98 49.58 43.66 93.24 94.55 92.26 94.60 93.28 94.43 33.49 29.60 0.00 155.42 233.49 327.03 415.75 509.99 602.30 694.93 787.95 883.25 976.52 1069.14 1160.61 1253.32 1347.35 1439.46 1534.29 1629.87 1723.00 1813.70 1862.97 1906.36 1999.05 2093.11 2184.95 2279.15 2371.90 2464.97 2497.56 2526.14 0.06 0.11 0.23 0.54 0.98 1. 20 1.12 0.88 0.67 0.44 -0.04 -0.63 -1. 37 -2.40 -4.01 -6.36 -8.89 -10.62 -9.36 -2.79 2.41 7.05 16.98 26.63 35.46 44.11 54.01 69.70 77.34 84.99 0.05 0.10 -0.00 -0.34 -0.86 -1. 41 -1. 78 -2.10 -2.31 -2.46 -2.55 -2.67 -2.64 -2.34 -1. 78 -1. 09 -0.43 0.12 -0.02 -1. 71 -3.06 -4.33 -8.29 -13.16 -17 . 80 -22.58 -27.86 -35.08 -38.41 -41.81 -0.10 -0.20 -0.27 -0.43 -0.61 -0.53 -0.20 0.30 0.68 1. 05 1. 69 2.45 3.31 4.34 5.90 8.25 10.83 12.53 11.12 4.40 -0.90 -5.60 -14.86 -23.19 -30.71 -37.91 -46.29 -60.30 -67.24 -74.14 0.11 0.22 0.27 0.55 1. 06 1. 50 1. 79 2.12 2.41 2.67 3.06 3.62 4.23 4.93 6.17 8.33 10.83 12.53 11.12 4.72 3.19 7.08 17.01 26.66 35.49 44.13 54.03 69.77 77.44 85.12 296.57 297.04 269.51 231.93 215.45 200.55 186.27 171.86 163.66 156.87 146.57 137.38 128.56 118.33 106.81 97.56 92.28 89.47 90.11 111.22 196.41 232.26 240.83 240.42 239.90 239.22 238.96 239.81 240.26 240.58 DLS (deg/ 100f) 0.00 0.05 0.29 0.15 0.29 0.37 0.09 0.19 0.31 0.29 0.08 0.11 0.21 0.25 0.51 0.62 0.41 0.72 3.42 4.21 0.53 0.93 1. 52 0.51 0.33 0.33 2.14 5.47 6.63 4.68 ------ ------ Srvy Tool tool Carr type (deg) ------ ------ TIP None MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK . MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK . MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 Page 3 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 31 32 33 34 35 2562.81 2591.90 2628.07 2655.84 2686.92 36 37 38 39 40 2718.71 2749.91 2798.38 2856.54 2909.66 41 42 43 44 45 3006.92 3102.80 3199.21 3295.21 3392.93 46 47 48 49 50 3488.29 3584.58 3680.92 3776.78 3873.18 51 52 53 54 55 3968.74 4064.79 4160.95 4257.35 4348.86 56 57 58 59 60 4446.91 4545.83 4641. 52 4737.67 4831. 97 17.56 19.43 19.93 20.53 21. 45 22.14 23.21 24.47 26.47 29.58 33.61 37.72 41. 06 43.34 45.61 44.79 45.23 44.69 45.06 44.60 44.05 43.64 43.86 43.42 43.94 43.12 44.42 44.65 43.99 43.63 242.48 241.38 240.84 241. 04 241.15 240.27 238.46 236.38 236.45 236.00 231.80 227.46 226.91 232.11 237.12 237.13 235.98 235.88 236.81 236.48 237.25 237.36 238.30 238.37 237.59 237.35 236.52 236.80 236.28 236.15 [(c)2005 IDEAL ID8_1C_02] 29.99 29.09 36.17 27.77 31.08 31.79 31.20 48.47 58.16 53.12 97.26 95.88 96.41 96.00 97.72 95.36 96.29 96.34 95.86 96.40 95.56 96.05 96.16 96.40 91. 51 98.05 98.92 95.69 96.15 94.30 2554.87 2582.46 2616.52 2642.57 2671.59 2701.11 2729.90 2774.23 2826.74 2873.62 2956.46 3034.35 3108.85 3179.99 3249.73 3316.92 3385.00 3453.17 3521.10 3589.47 3657.83 3727.11 3796.57 3866.33 3932.51 4003.60 4075.03 4143.24 4212.03 4280.08 93.55 102.75 114.90 124.49 135.60 147.38 159.40 178.99 203.99 228.94 279.76 335.09 395.29 459.12 527.46 595.12 663.21 731.27 798.89 866.84 933.61 1000.14 1066.64 1133.16 1196.35 1263.88 1332.31 1399.41 1466.58 1531.85 -45.73 -50.08 -55.96 -60.62 -66.01 -71.78 -77.91 -88.47 -102.30 -116.18 -146.27 -182.53 -224.11 -265.90 -305.47 -342.20 -379.73 -417.86 -455.34 -492.71 -529.21 -565.15 -600.55 -635.48 -668.99 -81.80 -89.94 -100.60 -109.00 -118.74 -129.03 -139.38 -155.88 -176.72 -197.46 -238.53 -281.02 -325.89 -374.94 -430.75 -487.57 -544.39 -600.78 -657.08 -713.85 -769.76 -825.75 -882.04 -938.66 -992.25 -705.30 -1049.18 -742.64 -1106.52 -779.52 -1162.59 -816.56 -1218.63 -852.86 -1272.89 93.71 102.94 115.12 124.72 135.85 147.66 159.68 179.24 204.19 229.10 279.81 335.10 395.51 459.65 528.07 595.67 663.75 731.81 799.44 867.38 934.13 1000.63 1067.08 1133.54 1196.70 1264.21 1332.63 1399.74 1466.91 1532.19 240.79 240.89 240.91 240.92 240.93 240.91 240.80 240.42 239.93 239.53 238.48 237.00 235.48 234.66 234.66 234.94 235.10 235.18 235.28 235.39 235.49 235.61 235.75 235.90 236.01 236.09 236.13 236.16 236.18 236.18 DLS (degl 100f) 6.06 6.54 1. 47 2.17 2.96 2.40 4.09 3.12 3.44 5.87 4.72 5.03 3.48 4.34 4.28 0.86 0.96 0.57 0.79 0.53 0.81 0.43 0.71 0.46 0.82 0.85 1.44 0.32 0.78 0.39 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_Inc_Only . MWD_Inc_Only MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report -------- -------- Seq Measured # depth (ft) ------ ------ Incl angle (deg) ------- ------- Azimuth angle (deg) ------ ------ Course length (ft) -------- -------- TVD depth (ft) 8-Feb-2005 17:45:02 -------- -------- ---------------- ---------------- Page 4 of 10 --------------- --------------- Total displ (ft) At Azim (deg) DLS (degl 100f) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 hole 77 78 79 80 81 82 83 84 85 86 87 88 89 90 4928.03 5023.20 5119.83 5216.82 5313.24 5409.71 5505.37 5602.48 5697.64 5793.44 5889.06 5985.53 6079.45 6108.00 6120.00 6138.00 6150.44 6182.64 6214.86 6246.66 6278.79 6310.73 6342.35 6374.53 6406.60 6438.86 6468.38 6502.04 6533.70 6565.97 44.71 44.27 43.93 44.04 44.17 43.74 45.59 48.31 51. 38 54.39 57.95 61. 01 65.32 66.72 68.58 68.58 71.83 75.37 79.31 81. 05 82.19 86.40 87.99 88.81 92.23 93.70 96.37 100.67 101.58 100.82 235.59 235.98 235.90 234.58 235.63 235.73 235.49 234.89 233.90 235.09 233.06 230.89 228.53 228.09 227.58 227.58 227.70 228.20 229.00 229.80 230.68 231.48 230.96 227.00 225.75 225.64 223.07 221.71 222.49 220.73 [(c)2005 IDEAL ID8_1C_02] 96.06 95.17 96.63 96.99 96.42 96.47 95.66 97.11 95.16 95.80 95.62 96.47 93.92 28.55 12.00 18.00 12.44 32.20 32.22 31. 80 32.13 31. 94 31.62 32.18 32.07 32.26 29.52 33.66 31.66 32.27 4348.98 4416.87 4486.27 4556.05 4625.29 4694.74 4762.77 4829.06 4890.42 4948.22 5001.45 5050.44 5092.83 5104.43 5109.00 5115.57 5119.78 5128.87 5135.93 5141.35 5146.04 5149.21 5150.76 5151.66 5151.37 5149.70 5147.11 5142.12 5136.01 5129.74 Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) 1598.75 1665.42 1732.64 1799.95 1867.00 -890.42 -927.92 -965.58 -1003.98 -1042.37 -1328.29 -1383.44 -1439.15 -1494.49 -1549.53 1933.93 -1080.12 -1604.83 2001.14 -1118.10 -1660.32 2072.04 -1158.62 -1718.57 2144.66 -1200.97 -1777.69 2220.95 -1245.31 -1839.88 2300.22 -1291.93 -1904.17 2382.94 -1343.13 -1969.60 2465.96 -1397.33 -2033.48 2491.71 -1414.68 -2052.96 2502.66 -1422.13 -2061.19 2519.17 -1433.44 -2073.56 2530.70 -1441.32 -2082.21 2561.17 -1462.01 -2105.14 2592.23 -1482.79 -2128.72 2623.26 -1503.18 -2152.51 2654.79 -1523.51 -2176.94 2686.38 -1543.47 -2201.67 2717.77 -1563.25 -2226.29 2749.59 -1584.36 -2250.55 2781.06 -1606.48 -2273.76 2812.60 -1628.98 -2296.81 2841.25 -1650.00 -2317.37 2873.39 -1674.58 -2339.81 2903.36 -1697.63 -2360.63 2933.82 -1721.30 -2381.65 1599.13 1665.82 1733.06 1800.41 1867.50 1934.46 2001.70 2072.65 2145.34 2221. 70 2301.07 2383.97 2467.31 2493.19 2504.19 2520.79 2532.39 2563.02 2594.25 2625.42 2657.10 2688.80 2720.31 2752.30 2784.02 2815.84 2844.77 2877.31 2907.67 2938.56 236.16 236.15 236.14 236.11 236.07 236.06 236.04 236.01 235.96 235.91 235.84 235.71 235.50 235.43 235.40 235.34 235.31 235.22 235.14 235.07 235.01 234.97 234.92 234.85 234.76 234.65 234.55 234.41 234.28 234.14 1. 20 0.54 0.36 0.95 0.77 0.45 1. 94 2.84 3.32 3.29 4.12 3.72 5.11 5.10 15.99 0.00 26.14 11. 09 12.47 6.01 4.46 13 .41 5.29 12.56 11. 35 4.57 12.53 13.38 3.76 5.85 ----- ------ ------ Srvy Tool tool Corr type ( deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_BLIND_TOW MWD_BLIND_BOW MWD_BLIND_Rat INC+TREND INC+TREND INC+TREND INC+TREND . MWD_Inc_Only MWD_Inc_Only MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Page 5 of 10 Seq Measured # depth (ft) -------- --- -------- 91 92 93 94 95 6598.45 6629.06 6659.75 6690.19 6722.07 96 97 98 99 100 6754.46 6784.69 6816.88 6848.95 6881.60 101 102 103 104 105 6912.65 6944.79 6977.36 7008.85 7041. 24 106 107 108 109 110 7073.30 7105.18 7137.41 7169.85 7200.90 111 112 113 114 115 7233.68 7266.09 7297.76 7329.43 7361.41 116 117 118 119 120 7393.80 7425.82 7457.86 7489.42 7521. 64 Incl angle (deg) ------ ------ 98.52 96.71 94.06 92.72 92.79 93.00 93.27 92.11 91. 45 91.15 92.07 92.14 91. 83 92.83 96.89 97.79 97.75 97.86 97.72 97.58 95.47 92.35 91. 87 92.00 91.42 90.73 90.22 88.61 88.33 91.15 Azimuth angle (deg) ------- ------- 219.01 216.76 213.83 211.66 209.78 208.34 205.71 202.50 198.89 196.22 192.41 192.20 191.15 190.97 190.14 189.70 188.84 189.18 190.62 189.79 188.81 189.31 190.78 189.67 190.44 189.47 188.59 191. 98 193.64 195.96 [(c)2005 IDEAL ID8_1C_02] Course length (ft) ------ ------ 32.48 30.61 30.69 30.44 31. 88 32.39 30.23 32.19 32.07 32.65 31.05 32.14 32.57 31. 49 32.39 32.06 31.88 32.23 32.44 31.05 32.78 32.41 31. 67 31.67 31. 98 32.39 32.02 32.04 31.56 32.22 TVD depth (ft) -------- -------- 5124.29 5120.23 5117.35 5115.55 5114.02 5112.38 5110.73 5109.22 5108.22 5107.48 5106.61 5105.43 5104.30 5103.02 5100.28 5096.18 5091.87 5087.49 5083.10 5078.96 5075.24 5073.03 5071.86 5070.79 5069.84 5069.23 5068.96 5069.29 5070.13 5070.28 Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) -------- -------- ---------------- ---------------- 2964.34 -1745.87 -2402.18 2992.94 -1769.81 -2420.80 3021.24 -1794.75 -2438.45 3048.85 -1820.31 -2454.89 3077.30 -1847.68 -2471.15 3105.78 -1875.95 -2486.87 3131.81 -1902.84 -2500.58 3158.69 -1932.19 -2513.71 3184.38 -1962.17 -2525.04 3209.44 -1993.29 -2534.88 3232.10 -2023.35 -2542.55 3254.78 -2054.74 -2549.40 3277.50 -2086.61 -2555.98 3299.22 -2117.49 -2562.02 3321.29 -2149.21 -2567.93 3342.78 -2180.53 -2573.41 3363.87 -2211.71 -2578.50 3385.07 -2243.24 -2583.50 3406.78 -2274.91 -2589.02 3427.69 -2305.19 -2594.48 3449.44 -2337.33 -2599.74 3470.93 -2369.26 -2604.83 3492.37 -2400.42 -2610.35 3513.89 -2431.57 -2615.97 3535.55 -2463.04 -2621.55 3557.45 -2494.94 -2627.15 3578.72 -2526.56 -2632.17 3600.52 -2558.08 -2637.89 3622.98 -2588.84 -2644.89 3646.70 -2619.99 -2653.12 Total displ (ft) At Azim (deg) --------------- --------------- 2969.60 2998.76 3027.73 3056.14 3085.53 3115.08 3142.24 3170.50 3197.80 3224.72 3249.39 3274.35 3299.55 3323.81 3348.64 3373.00 3397.10 3421. 49 3446.48 3470.62 3495.96 3521.15 3546.26 3571.53 3597.10 3623.07 3648.54 3674.54 3701.02 3728.72 233.99 233.83 233.65 233.44 233.21 232.97 232.73 232.45 232.15 231. 82 231.49 231.13 230.77 230.43 230.07 229.72 229.38 229.03 228.70 228.38 228.04 227.71 227.40 227.09 226.79 226.48 226.17 225.88 225.61 225.36 DLS (deg/ 100f) 8.80 9.38 12.84 8.37 5.89 4.49 8.73 10.59 11.44 8.23 12.62 0.69 3.36 3.23 12.79 3.12 2.68 1.10 4.42 2.69 7.09 9.75 4.88 3.53 3.01 3.67 3.18 11.71 5.33 11.33 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 Page 6 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seg Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) DLS (deg/ 100f) ------ ------ Srvy Tool tool Corr type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- 121 122 123 124 125 7554.02 7585.90 7618.48 7650.40 7681.96 126 127 128 129 130 7714.43 7745.65 7777.89 7810.83 7842.55 131 132 133 134 135 7874.28 7906.85 7937.02 7969.17 8001. 3 6 136 137 138 139 140 8033.59 8065.20 8097.62 8129.55 8160.69 141 142 143 144 145 8194.13 8225.94 8256.46 8289.35 8321.05 146 147 148 149 150 8352.54 8385.04 8417.19 8449.25 8481.49 93.65 93.48 94.44 95.78 94.72 93.41 92.24 89.91 89.77 90.53 90.67 91. 04 88.85 87.82 88.50 88.74 89.19 90.22 90.97 91. 80 91.93 91. 80 91. 52 91. 45 91. 93 92.28 91. 80 91. 32 91. 32 91. 01 199.17 201.10 201.43 201. 59 201.50 202.55 200.95 201.71 201. 74 200.90 200.98 198.91 198.37 197.70 195.87 193.70 190.43 187.55 185.69 185.95 183.21 182.51 181.64 180.55 177.16 179.57 180.08 179.87 178.98 180.07 [(c)2005 IDEAL ID8_1C_02] 32.38 31.88 32.58 31. 92 31.56 32.47 31.22 32.24 32.94 31.72 31. 73 32.57 30.17 32.15 32.19 32.23 31. 61 32.42 31. 93 31.14 33.44 31.81 30.52 32.89 31.70 31. 49 32.50 32.15 32.06 32.24 5068.92 5066.94 5064.69 5061.85 5058.96 5056.66 5055.12 5054.52 5054.61 5054.52 5054.19 5053.71 5053.74 5054.67 5055.70 5056.48 5057.05 5057.22 5056.89 5056.13 5055.05 5054.01 5053.13 5052.27 5051.34 5050.18 5049.03 5048.15 5047.41 5046.76 3671.53 -2650.82 -2662.88 3696.85 -2680.70 -2673.83 3723.10 -2710.98 -2685.62 3748.86 -2740.56 -2697.27 3774.33 -2769.79 -2708.82 3800.74 -2799.82 -2720.96 3826.08 -2828.78 -2732.52 3852.13 -2858.80 -2744.24 3878.89 -2889.40 -2756.43 3904.52 -2918.95 -2767.96 3930.04 -2948.58 -2779.30 3955.89 -2979.20 -2790.41 3979.42 -3007.78 -2800.05 4004.26 -3038.34 -2810.00 4028.68 -3069.14 -2819.29 4052.39 -3100.29 -2827.52 4074.61 -3131.19 -2834.12 4096.13 -3163.21 -2839.19 4116.31 -3194.92 -2842.87 4135.66 -3225.89 -2846.02 4155.85 -3259.21 -2848.69 4174.30 -3290.96 -2850.28 4191.65 -3321.45 -2851.38 4209.89 -3354.32 -2852.01 4226.43 -3385.99 -2851.38 4242.62 -3417.45 -2850.48 4260.03 -3449.93 -2850.38 4277.33 -3482.07 -2850.37 4294.33 -3514.11 -2850.05 4311.47 -3546.35 -2849.78 3757.36 3786.22 3816.02 3845.25 3874.20 3904.18 3933.02 3962.78 3993.31 4022.67 4052.00 4081.91 4109.39 4138.55 4167.50 4196.03 4223.34 4250.52 4276.61 4301.89 4328.68 4353.68 4377.49 4402.89 4426.66 4450.19 4475.12 4499.93 4524.57 4549.48 225.13 224.93 224.73 224.54 224.36 224.18 224.01 223.83 223.65 223.48 223.31 223.13 222.95 222.76 222.57 222.37 222.15 221.91 221.66 221. 42 221.15 220.90 220.65 220.37 220.10 219.83 219.56 219.30 219.04 218.78 12.56 6.07 3.12 4.23 3.37 5.17 6.34 7.60 0.43 3.57 0.51 6.46 7.48 3.82 6.06 6.77 10.44 9.43 6.28 2.79 8.20 2.24 2.99 3.32 10.80 7.73 2.15 1. 63 2.78 3.51 ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Page 7 of 10 Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (de g) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 151 152 153 154 155 8513.50 8545.30 8577.72 8609.74 8641.86 156 157 158 159 160 8674.80 8706.84 8738.52 8771.04 8802.98 161 162 163 164 165 8834.85 8867.43 8899.58 8931.45 8963.82 166 167 168 169 170 8995.67 9027.75 9059.92 9092.28 9124.46 171 172 173 174 175 9156.22 9188.52 9219.76 9252.17 9282.98 176 177 178 179 180 9313.66 9340.22 9375.15 9405.18 9436.08 90.94 90.60 91. 01 90.73 90.91 90.97 91. 80 92.38 92.38 91. 04 90.70 90.77 90.60 90.90 90.29 89.02 89.26 89.77 90.19 90.46 90.01 89.84 89.91 89.91 89.84 89.09 88.71 89.16 87.96 87.95 179.71 179.89 179.03 178 . 89 178 . 44 179.59 177.01 177.90 177.97 177.92 176.87 178 . 02 176.95 177.73 176.97 179.89 179.27 181. 82 182.92 182.08 182.23 182.80 181.77 181.91 182.31 181.27 182.24 180.79 180.62 180.46 [(c)2005 IDEAL ID8_1C_02] 32.01 31.80 32.42 32.02 32.12 32.94 32.04 31. 68 32.52 31. 94 31. 87 32.58 32.15 31.87 32.37 31. 85 32.08 32.17 32.36 32.18 31. 76 32.30 31. 24 32.41 30.81 30.68 26.56 34.93 30.03 30.90 5046.21 5045.78 5045.33 5044.84 5044.38 5043.84 5043.07 5041.91 5040.56 5039.61 5039.12 5038.71 5038.32 5037.91 5037.57 5037.76 5038.24 5038.52 5038.53 5038.34 5038.21 5038.26 5038.32 5038.38 5038.44 5038.73 5039.24 5039.89 5040.64 5041. 75 4328.66 -3578.35 -2849.72 4345.70 -3610.15 -2849.61 4362.91 -3642.56 -2849.30 4379.67 -3674.57 -2848.72 4396.33 -3706.68 -2847.97 4413.60 -3739.61 -2847.41 4430.05 -3771.63 -2846.46 4445.90 -3803.25 -2845.05 4462.41 -3835.72 -2843.88 4478.63 -3867.63 -2842.73 4494.56 -3899.46 -2841.29 4510.87 -3932.01 -2839.83 4526.99 -3964.12 -2838.42 4542.89 -3995.95 -2836.94 4559.05 -4028.29 -2835.45 4575.47 -4060.12 -2834.57 4592.55 -4092.20 -2834.34 4610.14 -4124.36 -2834.65 4628.69 -4156.69 -2835.98 4647.19 -4188.84 -2837.39 4665.29 -4220.58 -2838.58 4683.87 -4252.85 -2840.00 4701.74 -4284.06 -2841.24 4720.07 -4316.46 -2842.28 4737.61 -4347.25 -2843.42 4754.94 -4377.91 -2844.38 4769.93 -4404.45 -2845.19 4789.51 -4439.36 -2846.11 4806.00 -4469.38 -2846.48 4822.88 -4500.26 -2846.77 4574.44 4599.29 4624.58 4649.48 4674.44 4700.26 4725.19 4749.64 4774.98 4799.97 4824.80 4850.29 4875.54 4900.60 4926.14 4951.71 4977.91 5004.56 5031.99 5059.36 5086.34 5113.93 5140.61 5168.21 5194.57 5220.78 5243.50 5273.36 5298.85 5325.08 218.53 218.29 218.03 217.78 217.54 217.29 217.04 216.80 216.55 216.32 216.08 215.84 215.60 215.37 215.14 214.92 214.71 214.50 214.30 214.11 213.92 213.73 213 .55 213.36 213 .19 213.01 212.86 212.66 212.49 212.32 DLS (deg/ 100f) 1.15 1.21 2.94 0.98 1. 51 3.50 8.46 3.35 0.22 4.20 3.46 3.54 3.37 2.62 3.01 10.00 2.07 8.08 3.64 2.74 1. 49 1. 84 3.30 0.43 1. 32 4.18 3.92 4.35 4.04 0.52 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 Page 8 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 181 182 183 184 185 9466.74 9498.04 9528.45 9559.69 9590.16 186 187 188 189 190 9621.40 9652.71 9683.01 9713.96 9744.82 191 192 193 194 195 9775.44 9806.19 9836.19 9867.07 9897.95 196 197 198 199 200 9929.20 9959.60 9990.64 10022.57 10054.74 201 202 203 204 205 10087.10 10118.28 10151.06 10182.44 10215.15 206 207 208 209 210 10246.72 10278.77 10310.79 10342.87 10374.76 86.79 86.51 88.13 88.78 88.51 88.23 89.94 90.05 89.91 89.81 90.22 89.77 90.49 91.35 91. 32 91. 08 90.87 89.19 89.26 89.67 89.67 89.88 89.36 86.89 86.34 86.41 87.10 88.61 90.60 88.23 180.31 182.37 182.38 183.96 183.62 184.49 184.31 183.94 184.63 184.76 185.53 185.26 184.94 184.07 183.01 180.74 181. 02 179.00 178.60 178.69 179.71 178.56 177.38 176.19 175.59 175.42 173.18 173.46 175.73 175.28 [(c)2005 IDEAL ID8_1C_02] 30.66 31.30 30.41 31. 24 30.47 31.24 31.31 30.30 30.95 30.86 30.62 30.75 30.00 30.88 30.88 31.25 30.40 31. 04 31.93 32.17 32.36 31.18 32.78 31.38 32.71 31.57 32.05 32.02 32.08 31. 89 5043.15 5044.98 5046.40 5047.25 5047.97 5048.85 5049.35 5049.36 5049.37 5049.44 5049.44 5049.44 5049.37 5048.87 5048.15 5047.50 5046.98 5046.97 5047.40 5047.70 5047.89 5048.01 5048.23 5049.25 5051.18 5053.18 5054.99 5056.19 5056.41 5056.74 Displ +N/S- (ft) 4839.55 -4530.88 -2846.98 4857.00 -4562.12 -2847.71 4874.41 -4592.47 -2848.97 4892.66 -4623.65 -2850.70 4910.74 -4654.04 -2852.71 4929.38 -4685.19 -2854.92 4948.22 -4716.41 -2857.32 4966.34 -4746.63 -2859.50 4984.91 -4777.49 -2861.81 5003.61 -4808.25 -2864.34 5022.36 -4838.74 -2867.08 5041.29 -4869.36 -2869.97 5059.63 -4899.24 -2872.64 5078.26 -4930.02 -2875.07 5096.46 -4960.83 -2876.97 5114.15 -4992.05 -2877.99 5130.92 -5022.45 -2878.46 5147.64 -5053.48 -2878.47 5164.28 -5085.40 -2877.80 5180.96 -5117.56 -2877.04 5198.01 -5149.92 -2876.59 5214.41 -5181.09 -2876.11 5231.08 -5213.85 -2874.95 5246.47 -5245.16 -2873.20 5262.05 -5277.73 -2870.85 5276.89 -5309.14 -2868.39 5291.37 -5340.98 -2865.21 5305.35 -5372.76 -2861.49 5320.01 -5404.69 -2858.46 5335.03 -5436.48 -2855.97 5351.09 5377.95 5404.39 5431.81 5458.76 5486.49 5514.41 5541.41 5569.06 5596.75 5624.38 5652.20 5679.31 5707.11 5734.70 5762.24 5788.83 5815.78' 5843.21 5870.84 5898.85 5925.86 5953.96 5980.55 6008.02 6034.45 6060.98 6087.25 6114.04 6141. 00 212.14 211. 97 211.81 211.66 211.51 211.36 211.21 211. 07 210.92 210.78 210.65 210.51 210.39 210.25 210.11 209.96 209.82 209.67 209.51 209.34 209.19 209.04 208.87 208.71 208.54 208.38 208.21 208.04 207.87 207.71 DLS (deg/ 100f) 3.81 6.63 5.33 5.47 1. 42 2.92 5.49 1. 27 2.27 0.53 2.85 1. 71 2.63 3.96 3.43 7.30 1.15 8.46 1.27 1. 30 3.15 3.75 3.93 8.74 2.49 0.58 7.30 4.80 9.41 7.56 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 Page 9 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 211 212 213 214 215 10406.65 10437.86 10470.16 10502.30 10534.35 216 217 218 219 220 10566.59 10598.64 10630.90 10663.30 10693.96 221 222 223 224 225 10725.88 10758.97 10790.66 10822.56 10854.65 226 227 228 229 230 10886.67 10918.44 10948.42 10981.62 11013 .54 231 232 233 234 235 11044.78 11078.32 11109.30 11140.35 11173.00 236 237 238 239 240 11204.30 11236.17 11269.91 11301.29 11332.36 86.96 85.96 86.27 86.44 86.44 86.03 88.95 90.25 92.55 92.59 93.48 92.96 93.20 92.55 90.80 89.29 88.81 88.78 89.22 89.60 89.70 90.22 89.60 91. 25 91.11 90.43 90.49 90.84 90.46 89.77 173.75 171.21 168.54 168.42 163.62 160.47 162.39 161.48 159.88 158.32 155.92 151. 44 149.81 152.66 149.15 147.09 148.37 148.32 149.86 150.61 151.74 151.73 151. 50 152.08 150.01 150.59 151.58 150.52 150.96 150.55 [(c)2005 IDEAL ID8_1C_02] 31. 89 31. 21 32.30 32.14 32.05 32.24 32.05 32.26 32.40 30.66 31. 92 33.09 31. 69 31.90 32.09 32.02 31. 77 29.98 33.20 31.92 31.24 33.54 30.98 31.05 32.65 31. 30 31.87 33.74 31. 38 31.07 5058.08 5060.01 5062.19 5064.24 5066.23 5068.35 5069.75 5069.98 5069.18 5067.81 5066.12 5064.26 5062.56 5060.96 5060.02 5059.99 5060.52 5061.15 5061.73 5062.06 5062.25 5062.27 5062.32 5062.09 5061.42 5061.00 5060.74 5060.35 5059.99 5059.93 5349.55 -5468.19 -2852.92 5362.76 -5499.07 -2848.84 5375.08 -5530.79 -2843.18 5386.61 -5562.22 -2836.77 5396.82 -5593.25 -2829.05 5404.95 -5623.85 -2819.13 5412.72 -5654.20 -2808.94 5420.81 -5684.87 -2798.93 5428.25 -5715.43 -2788.22 5434.46 -5744.05 -2777.29 5439.85 -5773.41 -2764.90 5443.46 -5803.02 -2750.26 5445.24 -5830.59 -2734.73 5447.37 -5858.52 -2719.41 5449.33 -5886.54 -2703.81 5449.73 -5913.73 -2686.90 5449.92 -5940.59 -2669.94 5450.41 -5966.10 -2654.21 5451.39 -5994.58 -2637.16 5452.97 -6022.29 -2621.31 5455.02 -6049.66 -2606.25 5457.56 -6079.20 -2590.37 5459.84 -6106.45 -2575.64 5462.21 -6133.81 -2560.97 5464.29 -6162.37 -2545.16 5465.87 -6189.56 -2529.66 5467.92 -6217.45 -2514.25 5470.07 -6246.98 -2497.92 5471.90 -6274.35 -2482.58 5473.71 -6301.46 -2467.40 6167.68 6193.20 6218.79 6243.85 6268.01 6290.89 6313.49 6336.54 6359.27 6380.24 6401.33 6421. 75 6440.08 6458.90 6477.80 6495.51 6513 .00 6529.87 6549.02 6568.05 6587.18 6608.08 6627.42 6646.97 6667.29 6686.54 6706.58 6727.88 6747.64 6767.31 207.55 207.39 207.21 207.02 206.83 206.62 206.42 206.21 206.01 205.80 205.59 205.36 205.13 204.90 204.67 204.43 204.20 203.98 203.75 203.52 203.31 203.08 202.87 202.66 202.44 202.23 202.02 201.79 201. 59 201.38 DLS (deg/ 100f) 6.23 8.73 8.30 0.65 14.95 9.83 10.90 4.92 8.65 5.08 8.01 13.61 5.19 9.15 12.22 7.98 4.30 0.19 4.82 2.63 3.63 1. 55 2.13 5.63 6.35 2.86 3.11 3.31 1. 85 2.58 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 17:45:02 Page 10 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 241 242 243 244 245 11365.80 11397.08 11429.70 11461.72 11494.10 246 247 248 249 250 11525.92 11557.85 11590.36 11621.43 11653.24 251 252 253 254 255 11685.94 11717.10 11748.70 11780.95 11813 .45 256 257 258 259 260 11845.57 11877.41 11910.10 11942.35 11973.71 261 262 263 12006.09 12041.37 12100.00 89.98 90.15 89.36 89.05 88.57 87.68 88.30 88.95 88.23 88.68 89.43 90.56 89.64 88.71 89.70 90.12 89.16 89.46 89.60 88.92 89.09 90.05 90.05 148.46 147.97 148.18 146.70 145.16 147.08 145.64 145.90 147.11 146.85 148.50 148.99 147.74 147.42 147.59 147.60 149.04 148.35 149.62 150.49 148.50 148.53 148.53 [(c)2005 IDEAL ID8_1C_02] 33.44 31.28 32.62 32.02 32.38 31.82 31.93 32.51 31.07 31.81 32.70 31.16 31. 60 32.25 32.50 32.12 31. 84 32.69 32.25 31.36 32.38 35.28 58.63 5060.00 5059.97 5060.11 5060.55 5061.23 5062.27 5063.39 5064.17 5064.93 5065.79 5066.33 5066.33 5066.28 5066.74 5067.19 5067.24 5067.44 5067.84 5068.10 5068.51 5069.07 5069.33 5069.28 5474.94 -6330.27 -2450.43 5475.39 -6356.86 -2433.96 5475.77 -6384.55 -2416.71 5475.79 -6411.53 -2399.48 5474.96 -6438.35 -2381.34 5474.25 -6464.75 -2363.61 5473.67 -6491.31 -2345.94 5472.75 -6518.18 -2327.66 5472.26 -6544.09 -2310.52 5472.03 -6570.75 -2293.19 5472.19 -6598.38 -2275.70 5472.92 -6625.01 -2259.54 5473.45 -6651.92 -2242.96 5473.55 -6679.14 -2225.68 5473.61 -6706.55 -2208.22 5473.72 -6733.66 -2191.01 5474.23 -6760.76 -2174.28 5474.97 -6788.69 -2157.30 5475.86 -6816.32 -2140.68 5477.32 -6843.50 -2125.03 5478.50 -6871.39 -2108.60 5479.19 -6901.47 -2090.17 5480.34 -6951.48 -2059.57 6788.00 6806.90 6826.63 6845.82 6864.63 6883.29 6902.21 6921. 32 6940.00 6959.41 6979.79 6999.74 7019.89 7040.21 7060.74 7081.15 7101.79 7123.22 7144.56 7165.83 7187.64 7211. 04 7250.16 201.16 200.95 200.73 200.52 200.30 200.08 199.87 199.65 199.45 199.24 199.03 198.83 198.63 198.43 198.22 198.02 197.83 197.63 197.44 197.25 197.06 196.85 196.50 DLS (degl 100f) 6.28 1. 66 2.51 4.72 4.98 6.65 4.91 2.15 4.53 1. 63 5.54 3.95 4.91 3.05 3.09 1. 31 5.44 2.30 3.96 3.52 6.17 2.72 0.00 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFRßS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS Projected to TD . ~~!Æ~~ (ill} !Æ~fÆ~:~!Æ . AI,ASIiA. OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay S-213AL2 BP Exploration (Alaska) Inc. Pennit No: 204-216 Surface Location: 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM Bottomhole Location: 2757' NSL, 1269' WEL, SEC. 03 T11N, R12E, UM (Dba) Dear Mr. Crane: Enclosed is the approved application for pennit to redrill the above development well. The pennit is for a new wellbore segment of existing well PBU S-213A, Pennit No. 204-213, API 50-029-22993-01. Production should continue to be reported as a function ofthe original API number stated above. This pennit to redrill does not exempt you from obtaining additional pennits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennits and approvals have been issued. In addition, the Commission reserves the right to withdraw the pennit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the tenns and conditions of this pennit may result in the revocation or suspension of the pennit. Please provide at least twenty-four (24) hours notice for a representative of the Commission t 'tness any required test. Contact the Commission's petroleum field inspector at (907) 659- ager). Chainnan BY ORDER OF THE COMM N DATED thisL day of er,2,,004 .V4M \0.1" cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. \Lt. C A- v Il.(ø' l-00t o Drill III Redrill 1a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM Top of Productive Horizon: 2321' NSL, 1796' WEL, SEC. 34, T12N, R12E, UM (OBa) Total Depth: 1"1/-V ~ 2757' NSL, 1269' WEL, SEC. 03,~R12E, UM (OBa) 4b. Location of Well (State Base Plane Coordinates): Surface: x- 618930 y- 5980550 Zone- ASP4 16. Deviated Wells: Kickoff Depth: 6070 feet Maximum Hole Angle: 93 degrees . STATE OF ALASKA ., ALASKA Oil AND GAS CONSERVATION COMMISSIQN PERMIT TO DRILL 20 MC 25.005 11 b. Current Well Class 0 Exploratory . Qe1/iIOprnent 08 C\1Þl1lí1Ðpte Zone o Stratigraphic Test 0 Service 0 Developme~ .<;3~~.;¡ \J,&ingle Zone 5. Bond: a Blanket 0 Single Well 11. Well Name and'1',jumber: Bond No. 2S100302630-277 PBU S-213~ L 2- 6. Proposed Depth: 12. Field / Pool(s): MD 12139' TVD 5082' Prudhoe Bay Field / Polaris Pool 7. Property Designation: ADL 028253 2 '2 2004 ~ 8. Land Use Permit: 13. Approximate Spud Date: 11/01/04 14. Distance to Nearest Property: 9900' 9. Acres in Property: 2560 18. Casing Program: Size Casinç¡ 4-1/2" Hole 6-3/4" Weiç¡ht 12.6# SpeqiflCätiOl1s I Grade Couplinç¡ Lenç¡th L-80 IBT 6094' 10. KB Elevation 15. Distance to Nearest Well Within Pool (Height above GL): 61.90' feet 500' away from S-01 at Top OA 17. Maximum Anticipated Pressures in psig (see 20 MC 25.035) Downhole: 2312 Surface: 1807 $ètting PE:)Pt.l1 Top" , BóttOn'} MD TVD MD TVD (includinç¡ staç¡e data) 6045' 5082' 12139' 5082' Uncemented Slotted Liner 19, PRESENT WELL CqNDITION SUMMARY (To be completed for RedrilIANCl Re'-èntry Openatiol1s) Total D~i~~MD (ft): Total D~~2TVD (ft): l Plugs ~o~~SUred): I Effective ~2~~ MD (ft): IEffective ~~j~ TVD Junk ~o~~SUred): Lengt 1 Size Structural Conductor 110' 20" 260 sx Arctic Set (Approx.) 110' 110' Surface 2831' 9-5/8" 440 sx Arcticset Lite 3, 215 sx CI 'G' 2859' 2829' Intermediate Production 6565' 7-5/8" 202 sx Class 'G' 6591' 5227' Liner 5749' (OBd) 4-1/2" Uncemented Slotted Liner 6400' - 12149' 5198' - 5217' Liner (AL 1, OBb) 5516' 4-1/2" Uncemented Slotted Liner 6634' - 12150' 5182' - 5122' Liner (AL2, OBc) 5832' 4-1/2" Uncemented Slotted Liner 6312' - 12144' 5177' - 5172' 20. Attachments 0 Filing Fee, $100 0 BOP Sketch o Property Plat D! Diverter Sketch IPerfOration Depth TVD (ft): II Drilling Program 0 Time vs Depth Plot o Seabed Report a Drilling Fluid Program o Shallow Hazard Analysis a 20 MC 25.050 Requirements Date: Contact Michael Triolo, 564-5774 Perforation Depth MD (ft): 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Na~e L0;PII Crane J Title Senior Drilling Engineer Signatur~,--/~4. ~~_ Phone 564-4089 L/ Permit To Drill I API Number: Number: 20~ -.2./ -6 50- 029-22993-62-00 -Conditions of Approval: Samples Required 0 Yes ,)(NO Hydrogen Sulfide Measures 0 YeS~NO Other:'\€:st ÞO P E ~" i f<'; . Appmved Bv Ut Form 1 0-401 ReviU;~L Prepared By Name/Number: Date )C --22 -0'-( Sondra Stewman, 564-4750 I Permit Approval ,It /, /I I See cover letter for Date: I//I//), other requirements Mud Log Required 0 Yes ~o Directional Survey Required ~ es 0 No {'\ tJ " ¡'.-\ " !\ J A'I L II -, ~ \ i'U ¡'.. . APPROVED BY THE COMMISSION Date I~ ~ loci '!u:iit 'In bUPlicate · Greater pr.oe Bay S-213A ML Permit I Wè:lrName:( J$:.21~aA,S-213A L 1, S-213A L2.;, 8-213A:L.3, &S~213A L41 I Type of Well (producer or injector): I Schrader OBd, OBc, OBb, OBa and OA Multilateral Producer I Surface Location: 4,346' FSL, 4,500' FEL, Sec. 35, T12N, R11E X = 618,929.96 Y = 5,980,549.84 S-213a OBd Target Start: 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E X = 616,389.90 Y = 5,978,485.05 Z = 5,180' TVDss S-213a OBd Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11 N, R12E X = 61 Y = Z = 5,155' TVDss S-213a L 1 OBb Target Start: 2,545' FSL, 1,607' FEL, Sec. 34, T12N, R12E X = 616,574.94 Y = 5,978,712.43 Z = 5,120' TVDss S.213a L1 OBb Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E X = 616,999.90 Y = Z = 5,060' TVDss S-213a L2 OBc Target Start: 2,172' FSL, 1,873' FEL, Sec. 34, T12N, R12E X = 616,314.90 Y = 5,978,335.05 Z = 5,105' TVDss S-213a L2 OBc Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11 N, R12E X 616,999.90 Y Z 10' TVDss 0~~~.$ì$>";>~#~'¿'w.x-",~,:fi' S-213a L3 OBa Target Start: 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E X = 616,389.90 Y = 5,978,485.05 Z = 5,040' TVDss S-213a L3 OBa Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E X = 61 Y Z 5,020' TVDss S-213a L4 OA Target Start: 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E X = 616,389.90 Y = 5,978,485.05 Z = 5,000' TVDss 5-213a L4 OA Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E X = 616,999.90 Y = 5,973,650.05 Z = 4,990' TVDss I AFE Number: I PLD5M1074 KBE = 61.90' I Rig: I Doyon 16 I Estimated Start Date: I Nov. 1 SI 2004 I Operating days to complete: 150.68 OBd MD 12,149' Well TVDrkb: TD 5,217' Max Inc. 93° KOP 2,870' OBb MD 12,150' Well TVDrkb: TD 5,122' Max Inc. 99° KOP 6,337' OBc MD 12,144' Well TVDrkb: TD 5,172' Max Inc. 92° KOP 6,634' OBa MD 12,139' Well TVDrkb: TD 5,082' Max Inc. 93° KOP 6,070' OAMD 12,128' Well TVDrkb: TD 5,052' Max Inc. 93° KOP 5,943' Current Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Original Well API #: Sidetrack API #'s S-213a API OBd #: S-213a L1 API OBb #: S-213a L2 API OBc #: S-213a L3 API OBa #: S-213a L4 API OA #. Well Type: Current Status: H2S: -9,900' to PBU Unit Boundary at Top OA(this is the closest point in the producing well section to any unit boundary) -500' to S-01 (Ivishak well) at Top OA 50-029-22993-00 50-029-22993-01 50-029-22993-60 50-029-22993-61 50-029-22993-62 50-029-22993-63 Schrader O-sand Penta-lateral Producer Planned pre-rig decompletion: Tubing cut at ±5,250' MD o ppm from produced fluids (approximated to be around 10 ppm due to contaminated gas lift gas) Draft Permit 10/21/04 · BHT: 84 of @ 4,400' TVDss (Estimated) BHP: Static taken on S-213 on 9-18-04 showed an 8.15 ppg EMW. MDT's taken on S-116 on 12/03 agreed with the recent static, but also showed higher pressures at the midltoe of the planned S-213A trajectory Sand Heal Psi. (ppg) TVDrkb TDPsi(ppg) OA 2,141 (8.15) 5,052 2,338 (8.9) OBa 2,160 (8.15) 5,097 2,352 (8.9) OBb 2,175 (8.15) 5,132 2,370 (8.9) OBc 2,194 (8.15) 5,177 2,394 (8.9) OBd 2,215 (8.15) 5,227 2,414 (8.9) Cement: TO 1 PBTD: Is this well frac'd? Mechanical Condition S-213 Wellhead: Base Flange height: Nabor 9ES: Doyon 16: Tubing: Casing Casing Head: Casing Hanger: Tubing Spool: Tubing Head Adapter: Tbg. Hanger: Tree: Open Perfs: Tubing / Casing Fluids: Materials Needed Greater prwe Bay S-213A ML Permit TVOrkb 5,052 5,082 5,122 5,172 5,217 Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Top of cement on 9-%" casing is at surface. Top of cement on 7" casing is at 3,000' MD based on bond log run on 1/9/01 5,314' MD TOF inside 3-W' tubing. Yes FMC 11" Gen 5 with 7" mandrel hanger Above MSL = 35.90' KB / MSL = 64.40' KB / MSL = 61.90' 3-%", 9.3#, L-80, NSCT with tubing cut @ -5,260' MD. -Cut correlated to GLM @ 5,227 Surface: 9-%",40#, L-80, BTC to 2,859' MD Production: 7", 26#, L-80, BTC from surface to 6,507' MD FMC 11", 5M 7" FMC Mandrel Hanger and packoff with 8.000-4 ACME-2G-LH external R&R thread top FMC 11" X 11" 5M FMC 11" X 4-1/16", 5M FMC 11" x 4-%" with 4-V2" NSCT pup joint 7.11500 EN, CIW BPVT Cameron 5M,4-1/16" Currently from 5,892- MD to 6,165' MD (planned to be abandoned with drilling rig) SW with diesel cap down to -2,000' TVD 6,600' 1 each 40 each 2 lots 3 each 7-%" 29.7# L-80 STL-FJ Casing (Burst: 6,890; Collapse: 4,790) 7-%" STL-FJ Float Shoe and Float Collar 7-%" x 8- %" In-line Centralizers 7-%" casing pups 5',10',20' (Verify with Unique on stock) 7-%" RA Tag 5 x Production Liners: 29,210' 730 each 4 each 5 each 1 each 1 each 3 assemblies 4 %", 12.6#, L-80, IBT-Mod Slotted 4 W' x 5 3.,4" x 8" Straight Blade Centralizers 7-%" x 4-%" Baker ZXP Liner Top Packer 4- W' Halliburton Float Shoes 6" x 3" x 10' Aluminum KO billet 6.4" x 15' EWS Swell Packer Baker Level 3 Hookwall Hangers with LEM 2 Draft Permit 10/21/04 Greater prwe Bay 5-213A ML Permit 5,900' 1 each 3 each 1 each 4 each 1 each 5,900' 1 each 4-%", 12.6Ib/ft, L-80, BTC-M tubing Baker PRM Production Packer 7-%" X 4-W Halliburton X-Nipple (3.813" ID) 4-%" Baker CMD Sliding Sleeve Camco 4-Y2" X 1" KBG-2 Gas Lift Mandrels Phoenix pressure gauge I-wire for the Phoenix gauge 4-%" WLEG (Unique Machine) Surface and Anti-Collision Issues Surface Shut-in Wells: S-112i and S-120 will need to be shut-in for the rig move on and off S-213A. Close Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile. roach Well List: WW~fjllf'lr';~1 il.I'"II'~1_~ã"f,¡r~~~ NlA,::BL'L"' . N/A::, ê,:' . "N/A .", ,::""U~~D,. ....... ····1 Mud Program &-3A" Intermediate Hole Mud Properties: I Freshwater Mud (LSND) PH: 9.0 - 9.5 Interval I Density (ppg) Funnel vis I yp I Tauo I PV I API Filtrate I MBT 9.0 - 9.3 45 - 60 22 - 30 3 - 6 12 -18 4 - 6 < 20 Maintain proper fluid rheology & lubricant concentration to achieve the directional requirements Optimize mud rheology to maximize ROP while following ECD guidelines Reduce shaker blindin while drillin the UGNU BDF 263). 6-%" Production Hole Mud Properties: I LVT-200 MOBM (Versa-Pro) Interval I Density (ppg) Stability I yp I Oil: H20 Ratio I PV I API Filtrate I MBT 9.2 650 - 900 16 -19 80: 20 < 20 < 5 < 6 Minimize solids/liquid invasion by maintaining optimum PSD of bridging agents. Maintain minimal ECD's by reducing drill solids accumulation through utilization of the rigs solids control system and effective dilution. Interval Specific Objectives: Interval Specific Objectives: Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOPE and drilling fluid system schematics are on file with the AOGCC. Production Section- · Maximum anticipated BHP: · Maximum surface pressure: 2,312 psi @ 5,052' TVDss (8.8 ppg EMW). Based on S-116 MDT's 1,807 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) · Planned BOP test pressure: · Test Frequency: · Planned completion fluid: 3,500 psi (7-%" casing will be tested to 3,500 psi) 7 day test cycle (Pre drilling phase) 114 day test cycle (Drilling phase) Estimated 9.3 ppg Brine / 6.8 ppg Diesel ..!J[_II::'.··.':ì[.~_ ,J.,....'.....:m1i 5,000 psi Working Pressure 3,500/250 psi Rams & Valves (entire stack and valves 2,500/250 psi Annular 3 Draft Permit 10/21/04 . Greater prwe Bay S-213A ML Permit Disposal · NO ANNULAR INJECTION ON THIS WELL. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at OS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to OS-04 for injection. Haul all Class I waste to Pad 3 for disposal. Formation Markers SV6 1,561 N/A 718 8.8 Above KOP Base Permafrost 1,901 N/A 874 8.8 Above KOP SV5 2,137 N/A 983 8.8 Above KOP SV4 2,315 N/A 1,065 8.8 Above KOP SV3 2,681 N/A 1,233 8.8 No SV2 2,826 2,926 1,270 8.6 No SVl 3,153 3,340 1,427 8.7 Poss. Free Gas btw 3,150 & 3,190' UG4 3,484 3,802 1,585 8.7 No UG4A 3,510 3,839 1,598 8.8 Heavy Oil throughout UG3 3,855 4,320 1,763 8.8 Thin coals UGl 4,410 5,094 2,028 8.8 Heavy Oil throughout Ma 4,654 5,435 2,145 8.9 Yes Mbl 4,705 5,507 2,169 8.9 Yes Mb2 4,750 5,570 2,191 8.9 Oil & Water owe -4766'SS Mc 4,825 5,683 2,227 8.9 Yes Na 4,890 5,790 2,258 8.9 Yes Nb 4,905 5,816 2,265 8.9 Yes Nc 4,942 5,884 2,283 8.9 Yes OA 4,990 5,979 2,306 8.9 Yes OBa 5,035 6,080 2,327 8.9 Yes OBb 5,070 6,170 2,344 8.9 Yes OBc 5,115 6,312 2,365 8.9 Yes OBd 5,165 6,591 2,389 8.9 Yes T.D. 5,155 12,149 Yes CasinglTubing Program 8-3,4" 7-%" 29.7# L-80 STL-FJ 6,565' 26' 126' 6,591' 1 5,227' 6-3,4" OBd 4-Y2" slotted 12.6# L-80 IBT 5,749' 6,400' 1 5,198' 12,149' 15,217' 6-3,4" OBb 4-%" slotted 12.6# L-80 IBT 5,516' 6,634' 1 5,182' 12,150'/5,122' 6-3,4" OBc 4-Y2" slotted 12.6# L-80 IBT 5,832' 6,312' 15,177' 12,144' 15,172' ß..3,4" OBa 4- %" slotted 12.6# L-80 IBT 6,094' 6,045' 1 5,082' 12,139' 15,082' 6-3,4" OA 4-Y2" slotted 12.6# L-80 IBT 6,210' 5,918' 15,022' 12,128' 15,052' Tubing 4-%" 12.6# L-80 IBT-M 5,844' 26' 1 26' 5,870' 1 5,000' Cement Calculations Casing Size 19-% -in 40-lb/ft L-80 BTC surface casing Cement KO Plug Basis 200% excess in open hole 50% excess in annulus. Top of KO plug 2,300' MO Total Cement Vol: Wash None Spacer None Lead None Tail 70-bbl, 423-sx 15.7-lb/gal AS1 - 0.93 ft~/sx . ". ,.(~~.p'...of t.~il..~~.~~~~~~.~~l . .... .... ..............................';' .. ".' .............~w.@'_@......w,..w.,.....'M@......."....._.",.. Temp r BHSf:'sO°F ir~~ S()R~' I3·Hcf·65;,F~~ti~at~~tb;D~;,eìì'· 4 Draft Permit 10/21/04 · Greater pr. Bay S-213A ML Permit Casing Size 17-% -in 29.7-lb/ft L-80 STL-FJ intermediate casing Basis Top of tail cement 500-ft MD above top of Schrader Ma-sand. 30% excess over gauge. Total Cement Vol: Wash 20-bbl Water Spacer 30-bb11 0.7 -Ib/gal MudPush Spacer Tail 43 bbl, 202-sx 15.8-lb/gal Premium - 1.20 ftj Isx with D600G - 2gal/sk; D047 - 0.2gal/sk; D174 - 3% BWOC; B153 - 0.15gal/sk of tail at Ma: MD Temp BHST == 85°F from SOR, BHCT 90°F estimated by Dowell 7-0/." Casing Space Out a) Space 7-%" casing out with pups and long/short joints as required to place the top of a long full joint - 5- 15' above the top of the OBc, OBa and OA sands to allow for the window to be milled just below the top of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance reservoir contact depending on the angle of intersection of each zone. b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth except on the OBd lateral. It will need to be placed 120' above the casing shoe. c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out. 7-0/." String Centralizer Placement a) Centralizer size: 7-%" X 8-%" Integral centralizers (7-%" X 8-%" X 17-%") b) Do not run centralizers on the window joints spaced at the top of each sand. c) Centralizers will be run on the first 40 joints to allow for adequate standoff for cement. d) The centralizer program is subject to change pending modeling and hole conditions. 4 %" Slotted Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop collar. Do not put any centralization on the first two joints above the bent joint. Survey and Logging Program 8-%" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only) Open Hole: MDT Pressures & Fluid Samples Cased Hole: USIT Bond Lo onl as contin ency if oor cement· ob 6-3,4" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (DenlNeu recorded only) I AIM I PWD Cased Hole: None 5 Draft Permit 10/21/04 · Greater Pree Bay S-213A ML Permit Drillina Hazards and Continaencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control/ Reservoir Pressures: Sand OA OBa OBb OBc OBd Heal Psi (ppg) 2,141 (8.15) 2,160 (8.15) 2,175 (8.15) 2,194 (8.15) 2,215 (8.15) TVDss 5,052 5,097 5,132 5,177 5,227 TD Psi (ppg) 2,338 (8.9) 2,352 (8.9) 2,370 (8.9) 2,394 (8.9) 2,414 (8.9) TVDss 5,052 5,082 5,122 5,172 5,217 Comments Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures II. Hydrates and Shallow gas: A. Gas hydrates are present below S-pad, but have not been a significant issue thus far during S-Pad drilling. If hydrates are encountered follow the recommended practice and apply good drilling operational practices. III. Lost Circulation/Breathing: A. Lost circulation is possible within the Schrader interval due to the reduced pore pressure. A LCM decision tree has been developed to give direction in the event of losses. B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee. IV. Kick Tolerance/lntegrity Testing: A. The 9-%" casing has been cemented to surface. B. The 7-%" flush joint casing will be cemented with 15.8 Ib/gal cement to 500' MD above the Ma sand. C. Integrity Testing: NOTE: If the LOT I FIT is less then the minimum notify the ODE immediately Surface I 8-3,4" 52.2 9.2 8.9 12.2 (LOT) Intermediate I 6-3,4" Infinite 9.2 8.9 10.5 (FIT) NOTE: FIT's will only be done on the first horizontal lateral due to pressure connectivity between subsequent laterals. NOTE: All LOT I FIT will be taken with a minimum of 2o-ft and a maximum of So-ft of new hole drilled outside of the previous casing string V. Stuck Pipe A. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners moving as much as possible and run one centralizer per joint to help with standoff. VI. Hydrogen Sulfide A. S-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. In Nov. 2003 85 ppm of H2S was measured at one S-Pad well (S-05A), however all other wells tested below 20 ppm in 2004 and since the reading, S-05A has been shut in. VII. Faults There is one planned fault crossing and two possible fault crossings while drilling the well. It is also possible to encounter sub-seismic faults along the proposed well path. In the production hole sections, if a fault throws us out of section steer up as fast as possible to determine where we are within the section. This will make it easy to lows ide OH sidetrack to get back on course. Fault #1: UG1 5,202' MD Fault #2: O-sands 5,900' MD Fault #3: O-sands 6,825' MD 4,485' TVDss 4,952' TVDss 5,176' TVDss 25' Northeast throw o - 20' Northeast throw o - 35' Northeast throw CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 Draft Permit 10/21/04 · Greater pree Bay S-213A ML Permit Drill and Complete Procedure Summary Pre-Rie: Work: 1. Rig up Schlumberger slickline, and drift tubing down to the jet pump fish with drift appropriate for 3.5" chemical/jet cutter. Last well operation was CTU fishing attempts to retrieve the jet pump. Last tag was at 5,314' CTU MD. a. NOTE: If use the chemical cutter it will be required to have the tubing and annulus hydrostatic pressures equalized prior to cutting the tubing. It may be desirable to punch holes in the tubing just below the proposed chemical cut depth in order to allow for pressure equalization. Optional string shot per SOP. 2. RIH w/ chemical/jet cutter. Cut the 3-%" L-80 tubing at approximately 5,250' MD. Chemical cutter is at the discretion of the Wells Group Representative. This cut will not be fished, however a complete cut is critical to successful decompletion. a. NOTE: If chemical cutter is used, then the well should be displaced to seawater prior to making the cut. It is against SOP to use a chemical cutter in diesel. 3. RU and circulate out the diesel through the tubing cut. Once the tubing ànd annulus are displaced, bullhead sufficient seawater below the jet pump to fill the volume (-20 bbls) to the perfs. Observe 1.5 bpm, 2500 psi max. Previous injectivity tests that were done showed a rate through the jet pump of approximately 1.2 bbls/min @ 2,000 psi surface pressure. Freeze protect down to 2,000' TVD with diesel. a. NOTE: This will leave the well -60 psi under-balanced with the formation. A static BHP was taken on 9/18/04 which gave a reservoir pressure of 2,110 psi @ 5,000' TVDss (8.12 ppg EMW). These pressures assume a diesel gradient of 0.354 psi/ft down to 2,000' TVDss and a seawater gradient of 0.447psi/ft down to 5,000' TVDss. b. NOTE: The well should not be left with methanol as a freeze protect fluid, diesel only. 4. Test all packoffs and tubing hanger seals to 5,000 psi for 30 minutes. MITOA and function test alllockdown screws, repair or replace as needed. a. Verify tubing and annuls pressures and give to rig during the handover. Set a BPV in the tubing hanger and a VR plug in the 7x4-W IA valve. Secure well. 5. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Drillinq Riq Decompletion Operations: 1. MIRU Doyon 16. Circulate out diesel with seawater. Verify the well is dead. 2. Set TWC. Nipple down tree. Nipple up and test BOPE. 3. Pull and lay down the 4-W tubing (planned tubing cut at -5,250'). 4. PU 4,200' of 4" DP and stand back in derrick. MU clean-out BHA with 4" DP and flat bottom mill (or used bit) / boot baskets / etc. RIH to top of tubing stub PU additional 4" DP, circulate and condition wellbore as required. Pump hot oil to remove excess paraffin if needed. 5. MU 7" Halliburton EZSV (running 00 5.5") and RIH and set just above tubing stub @ 5,250'). Set packer and test to 1,000 psi. Dump 10 bbls cement on top of EZSV (-261' of coverage). POOH and LD running tool. 6. MU 7" Halliburton EZSV (running 00 5.5") and RIH and set @ 3,150'. POOH and LD running tool. 7. MU 7" multistring casing cutting assembly and RIH to -2,940' MD and cut casing. Close annular and circulate annulus clean with hot seawater and Safeclean sweep, follow with 9.0 ppg mud. 8. Pull 7" casing and verify cut, circulate and reciprocate casing to clean up remainder of mud/diesel in OA. Remove wellhead pack-off and LD 7" casing. 9. RIH with cement stinger and lay in 70 bbl Class G 15.7 ppg Arctic Set 1 cement plug from EZSV @ 3,150' to 2,300' MD. (Assumes 200% excess in open hole portion from 2,940' to 2,860'.) POOH -;-lè ç I () .- 40 l It1Jf p!O<J Cv J. Drillinq Riq Sidetrack Operations: ~ ../ 1. MU 8-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at ±800' from the bit in the HWDP section and RIH to top cement plug. Dress off plug, circulate and condition mud. Directionally drill ahead to TO (Just below the Top OBd) as per directional profile to 6,591' MD / 5,227' TVD. a. Make short trip as needed, work tight spots as seen. 2. Circulate and condition mud at TO. Make sure hole is clean prior to POOH. POOH, LD drilling BHA. 3. RU Schlumberger DPC MDT tool assembly and RIH and acquire pressure and fluid samples as per the town Geologist. POOH and LD assembly. 7 Draft Permit 10/21/04 · Greater pru.e Bay S-213A Ml Permit 4. Make cleanout trip to TO and circulate and condition mud as appropriate. 5. MU and run 7-%" 29.7# L-80 STL flush joint casing to TO. Cement in one stage to 500' MD above the Schrader Ma sand. Bump plug with seawater. land casing on mandrel hanger. 6. Clean pits for displacement. Freeze protect 7-%" x 9-%" annulus with dead crude to 2,200' TVD. 7. PU 6-3,.4" conventional assembly with MW DIG R/Resl Azimuthal Den INeu/PWD and RIH to the float collar. Test the 7- %" casing to 3,500 psi for 30 minutes. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation below rathole and perform an FIT to 12.0 ppg EMW. 8. Directionally drill ahead to TO geosteering through the OBd to TO at 12,149' MD 15,217' TVD (prognosed). Perform wiper trip, circulate and condition mud as required. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. 9. POOH to near OBc window depth, log up across the OBc, OBa and OA windows. POH LD drilling assembly. 10. MU and run 4-W' 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TO. Position liner top packer 40' below the top OBc sand. POOH and LD liner running assembly. 11. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is near the top of the OBc sand (planned window exit: 6,312' MD). Orient whipstock to highside. Shear off Whipstock. Displace wellbore back to MOBM & mill window. POOH 12. RIH with 6-3,.4" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock. Directionally drill the OBb lateral to TO. Planned TO is 12,150' MD. Circulate and condition mud and perform wiper trip if necessary. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. POOH. 13. Run and set 4-¥2" slotted liner with 6" aluminum billet and Weatherford GS running tool, POOH and LD liner running string. 14. RIH with 6-3,.4" drilling assembly (with MWD / GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to aluminum billet in the open hole. 15. Displace well back to MOBM and KO of aluminum billet and directionally drill the OBc lateral to TO. Planned TO is 12,144' MD. Circulate and condition mud and perform wiper trip if necessary. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. POOH. 16. Pull whipstock #1. Run 4-%" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker Lateral Entry Module #1 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 17. PU the 7-%" whipstock assembly. Set the whipsock on the OBc liner top packer such that the top of the window is near the top of the OBa sand (planned window exit: 6,045' MD). Orient whipstock to highside. Shear off of Whipstock, displace well back to MOBM and mill window. POOH 18. RIH with 6-3,.4" drilling assembly (with MWD 1 GR / Res / Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock. Directionally drill the OBa lateral to TO. Planned TO is 12,139' MD. Circulate and condition mud and perform wiper trip. Displace well back to SFOBM and POOH. 19. Pull whipstock #2. Run 4-Y2" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 20. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is near the top of the OA sand (planned window exit: 5,918' MD). Orient whipstock to highside. Shear off of Whipstock, displace well back to MOBM and mill window. POOH 21. RIH with 6-3,.4" drilling assembly (with MWD 1 GR / Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock. Directionally drill the OA lateral to TO. Planned TO is 12,128' MD. Circulate and condition mud and perform wiper trip. Displace well back to SFOBM and POOH. 22. Pull whipstock #3. Run 4-%" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL brine. POOH. 23. MU 4-%" 12.6# BTM-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus. 24. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK-1 valve. 25. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 26. Pull two-way check. Freeze protect the well to 2,000' TVD. Install VR plug in 7-%" casing annulus valves. 27. Install BPV. Secure the well and rig down 1 move off Doyon 16. Post-RiQ Work: 1. MIRU slickline. Pull the ball and rod I RHC plug. 2. Pull out DCK-1 shear valve, install GLV in all of the other mandrels as per the PE. 8 Draft Permit 10/21/04 · POST RIG - COMPLETION _TREE FMC 4-1/16" 5M . S 213A L 1 L2 L3 & L~WELLHEAD FMC Gen 5 System - "" 11", 5M csg head wi 7-5/8" mandrel hanger & packott I 11"x11",5M,tbgspoolwl " 11" x 4-1/2" tubing hanger with controllíne ports .~ 11" X 4-1116" Adaptor Flange [1 ... ~ It 20' X 34" 215.5 Ibltt, A53 ERW Insulatedl 109' Halliburton X-Nipple (3.813" ID) 12,200' TVD I Phoenix Pressure Gauge with control lines to surface DATE 10/1212004 Ong KB elev (N-9ES) = 644' r New Plan h8 elev (016) = 619' Cameo 4-112" x 1" KBG-2 GLM's Junction SÞecific:ations: Junction 10 through LEM Module without díverter 3.65" /4.5" Baker sliding sleeve with 3.813" ID / .... 9-618",40# L-80 BTC Csg @ 2,859' MD 4-112~, 12"6 Ib/tt, L-aO, STC-M Tubing Coup 00 5.2 Orift/lO 3833"/3.958" - 7-518" X 5-1/2" Baker PRM Packer Halliburton X-Nipple (3.813" 10) 4.5"WLEG L 5,870' MD I 9.2 PPG Versapro MOBM below Completion OA Lateral r 5,918'-12,128'1 6-3/4" Open hole Horizontal Laterals 4-112",12.6 Ib/ft, L-aO, STC-M Liners Coup 00 5.2 OriftllD 3.833"/3.958" OBa Lateral 16,045'-12,139'1 7-5/8",297#. L-80, STL-FJ Cas In 9 0 ri ft 6.7 5 " Casing 10 6.875" RA Tag TBO Top Baker LEM Assembly @ 5,868' M 0 Window In 7·5/8" caslng@ 5,918' M 0 Well Inclination @ Window ~ 52' Top Baker LEM Assembly @ 5,995' MD Window in 7-5/8" casing@ 5,O1 5' MD Well Inclination @ Window = 65' Top Baker LEM Assembly@ 6.262' MD Window in 7-5/8' casing@ 6,312'MD Well Inclination @ Window = 71 ' 7-618" Casing Shoe @6.591' MD REV BY GL~ API 0: 150.029-22993.00 500029-22993-ICIC 150,,029-22993-xx 500029·22993-ICIC 500029-22993-xx COMMENTS MlK TRIOLO Level' Multi-Leterel, 4.lIZ' GL Completion POLARIS WELL: S-213A ML ¢? õ o 'A ê :.:::- ~ II ( ) ro (.) (f) o ¡::: 1800 4800 5400 1800 Schlumberger WELL FIELD Prudhoe Bay Unit - WOA STRUCTURE S-PAD S-213AL3 (P5) MagneticParametars Model' BGGM2004 Surfacetocation Date: Novembør15.2004 lat: N702119.849 FS: 57608.1nT Lon: W14922.959 NAD21 Alaska Stale Planes, Zone 04. US Foot Nonhlng: 5960549.84 !tUS Grid CO!W: +0.90963906' fasting: 618929.96 ftUS Scale Fact 0.9999160676 Miscellaneous Slot· 6-213 Plan: 8-213Al3 (P5) OBa Dip: 80.844' MagDec: +24.845' TVD Ref: Rotary Tabte (61.90 n above MSL) SrvyDate: October06.2004 2400 . 3000 3600 4200 4800 5400 6600 7200 6000 ,;....,....,....."...",......,..",.¡.....,....,..............···..···..";···..·..·..·..·",,..·..,,··,,·,....i..···..····..,····.......,....".....~.......".......h"................(".........".....,,',...............~.......,,,..........,...............(......................".............;..........,.........................i....4800 : :S-213AL3 T2 i S·213AL3 ~3 S~13AL3T4 i ¡ S.213AL3 T5 EncÌCrv ¡ ¡ : iJ900 PI ¡ Cry 6/100 I End crvl : Cry 6I100\.: \ lEnd Cry ~rv 6/100~/End Cry ¡ ! Cry 61100 \ I çrv 6/100 S·213AL3 T6\ i\End Cry TD /4-1/2" Lnr\: : End Cry : \ : : : : : \ : 1 . . : 13A (P4) OB ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ : : : , , , ,- j '213AL3!P5)OBa : : . . . , , i S:213ALI P5)OBb : ; : ! ; ; ! ¡ : S¡2UAL2 (P5) OBc K213 ""i . ! i ¡ ¡ ¡ ¡ 1 S¡218A(P4)OBd KOPCrvll.5/100- , : , , , , : : 1~,,:~~r'·~1Iimllmlmmrr ~oo 2400 3000 3600 4200 4800 5400 Vertical Section (ft) Azim = 196.54°, Scale = 1(in):600(ft) Origin = 0 N/-S, 0 E/-W 6000 6600 7200 e , WEl.l S-213AL3 (P5) -- Model: 8GGM2004 Dip: 80.844' Mag Dee: +24.845" ^ ^ ^ Z .::: Õ o ~ ê = ~ II ( ) (¡¡ o en en v v v . . FielD Prudhoe Bay Unit - WOA STRUCTURE S-PAD I ...-""""'" Date: NoYembeft5,2004 Lat: N702119.849 FS: 57608.7 nT W149 2 2.959 NAD27 Alaska Stale Planes, Zone 0-4, us Feet Northing: 5980549.84 nus Grid Corw: +0.90963906' Easting: 618929.96 ftUS Scale Fad.: 0.9999160676 ............ Slot: $-213 Plan: S-213AL3(P5)0Ba -4000 -3200 -2400 -1600 ~'" 5- ¡ -1600 · . · . '¥ ............... ...............n..'....... ....HH · . · . · . · . · . · . · . · . · . · . .........."............................ ..~?~.~.~.~~:~~~............ ~se Whipstock Top YVhlPstocl< roo" i -2400 ,·..........,.....,.......'.n....4.................,. Cry 61100 ~213AL3 T3 E~d Cry ... .............. ..._........ 13A.fft4........... .~...... .. ............ .._.... :Jof ,(~ ~ · . ..................H..............................................._.... · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . . . . .._...........""...., .... .......................................... ..........H............ · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . · . ,................... -3200 ............................... Cry 61100 ¡ 5-213AL3T4~ End CrY ~ -4000 · . ._........................._.......................4..............,;,.. · . · . · . · . · . · . · . · . · . · . · . -4800 ........................... ·HH. -5600 .......................... Cry 61100 5-213AL3 T5 -6400 · . · . · . ........,,,.......................,,......................,,,,........... · . · . TO 14-112"~nr ~ 5-213ALþ (P5) CBa ¡ S-213-}t2 (P5) CBe j 5-213~L1 (P5) CBb ¡ 5-21~A (P4) CBd . ~··__·:···=·~·:.·~==·~t::. -7200 .........................................h.."................ ...""",....i . , '5-213A FR? -4000 -3200 -2400 -1600 <<< W Scale = 1 (in):800(ft) E »> Schlumberger ì'JDRet. Rotafy Table (61.90 ftaboYe MSl) Srvy Dale: October 06, 2004 -800 -1600 -2400 -3200 -4000 -4800 -5600 -6400 -7200 -800 S-213AL3 (P5) Proposal Schlumberger Report Date: October 6, 2004 Survey I DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 196.540' Field: Prudhoe Bay Unit· WOA studY Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: S-PAD I S·213 II b lilt)' TVD Reference Datum: Rotary Table Well: S·213 F ea. I TVD Reference Elevation: 61.90 ft relative to MSL Borehole: Plan S-213AL3 OBa Sea Bed I Ground Level Elevation: 35.90 ft relative to MSL UWVAPI#: 500292299362 Magnetic Declination: 24.845' Survey Name I Date: S-213AL3 (P5) OBa / October 6, 2004 Total Field Strength: 57608.708 n T " ort I AHD I DDI/ ERD ratio: 190.568' /8544.987 ft /6.585/1.681 Magnetic Dip: 80.844' Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: November 15, 2004 Location Lat/Long: N 70.35551358, W 149.03415537 Magnetic Declination Model: BGGM 2004 Location Grid N/E YIX: N 5980549.840 nus, E 618929.960 nus North Reference: True North . Grid Convergence Angle: +0.90963906' Total Corr Mag North .> True North: +24.845' Grid Scale Factor: 0.99991607 Local Coordinates Referenced To: Weli Head I Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along HOle NS EW I DLS I Tool Face I Build Rate Walk Rate Northing Eastlng Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (It) (It) ( deg/tOO It ) (dog) (deg/tOO It) (deg/tOO It) (ltUS) (ltUS) Top Whipstock 6044.66 64.09 226.67 5020.00 5081.90 1893.18 2461.14 -1380.84 -2000.38 4.00 O.OOG 3.80 -1.40 5979137.54 616951.92 N 70.35174052 W 149.05039545 Base Whipstock 6056.66 66.01 226.67 5025.06 5086.96 1902.59 2472.02 -1388.31 -2008.29 16.00 O.OOG 16.00 0.00 5979129.95 616944.13 N 70.35172011 W 149.05045969 KOP Cry 11.5/100 6069.66 66.01 226.67 5030.35 5092.25 1912.86 2483.90 -1396.46 -2016.93 0.00 -9.04G 0.00 0.00 5979121.66 616935.62 N 70.35169784 W 149.05052981 6100.00 69.46 226.08 5041.84 5103.74 1937.22 2511.97 -1415.83 -2037.25 11.50 -8.82G 11.36 -1.93 5979101.97 616915.61 N 70.35164492 W 149.05069473 6200.00 80.83 224.31 5067.44 5129.34 2021.91 2608.47 -1483.85 -2105.69 11.50 -8.36G 11.37 -1.77 5979032.88 616848.27 N 70.35145903 W 149.05125018 90' Pt 6280.60 90.00 222.97 5073.88 5135.78 2093.35 2688.72 -1541.93 -2161.07 11.50 -8.25G 11.38 -1.66 5978973.93 616793.82 N 70.35130030 W 149.05169965 6300.00 92.21 222.65 5073.51 5135.41 2110.75 2708.12 -1556.16 -2174.25 11.50 -8.26G 11.38 -1.65 5978959.49 616780.87 N 70.35126142 W 149.05180661 End Cry 6308.54 93.18 222.51 5073.11 5135.01 2118.41 2716.65 -1562.44 -2180.02 11.50 O.OOG 11.38 -1.65 5978953.12 616775.20 N 70.35124426 W 149.05185344 Cry 6/100 6708.71 93.18 222.51 5050.91 5112.81 2477.63 3116.21 -1856.99 -2450.00 0.00 -91.41G 0.00 0.00 5978654.35 616509.96 N 70.35043935 W 149.05404440 6800.00 93.03 217.02 5045.96 5107.86 2561.36 3207.36 -1927.03 -2508.28 6.00 -91.71G -0.16 -6.01 5978583.40 616452.80 N 70.35024795 W 149.05451735 6900.00 92.84 211.02 5040.83 5102.73 2656.58 3307.23 -2009.77 -2564.13 6.00 -92.01G -0.19 -6.00 5978499.79 616398.28 N 70.35002187 W 149.05497052 S-213AL3 T2 6916.98 92.80 210.00 5040.00 5101.90 2673.03 3324.18 -2024.38 -2572.74 6.00 -91.65G -0.21 -6.00 5978485.05 616389.90 N 70.34998195 W 149.05504035 7000.00 92.65 205.02 5036.05 5097.95 2754.42 3407.11 -2097.91 -2611.03 6.00 -91.89G -0.19 -6.00 5978410.93 616352.79 N 70.34978104 W 149.05535098 7100.00 92.43 199.01 5031.62 5093.52 2853.82 3507.01 -2190.49 -2648.46 6.00 -92.16G -0.21 -6.00 5978317.78 616316.84 N 70.34952809 W 149.0556. End Cry 7174.14 92.26 194.56 5028.58 5090.48 2927.88 3581.10 -2261.39 -2669.85 6.00 O.OOG -0.24 -6.00 5978246.55 616296.57 N 70.34933437 W 149.0558 Cry 6/100 7833.90 92.26 194.56 5002.57 5064.47 3586.73 4240.34 -2899.45 -2835.63 0.00 -101.08G 0.00 0.00 5977605.99 616140.96 N 70.34759109 W 149.05717174 7900.00 91.49 190.67 5000.40 5062.30 3652.63 4306.40 -2963.91 -2850.06 6.00 -101.21G -1.16 -5.89 5977541.32 616127.56 N 70.34741497 W 149.05728866 S-213AL3 T: 7916.49 91.30 189.70 5000.00 5061.90 3669.02 4322.89 -2980.13 -2852.97 6.00 -100.93G -1.17 -5.89 5977525.05 616124.90 N 70.34737064 W 149.05731227 8000.00 90.35 184.78 4998.80 5060.70 3751.39 4406.39 -3062.94 -2863.49 6.00 -101.00G -1.14 -5.89 5977442.09 616115.70 N 70.34714441 W 149.05739740 End Cry 8003.66 90.30 184.56 4998.78 5060.68 3754.97 4410.05 -3066.59 -2863.79 6.00 O.OOG -1.15 -5.89 5977438.44 616115.46 N 70.34713444 W 149.05739981 Cry 6/100 8711.63 90.30 184.56 4995.02 5056.92 4447.52 5118.01 -3772.30 -2920.13 0.00 -136.88G 0.00 0.00 5976731.98 616070.33 N 70.34520644 W 149.05785491 S-213AL3 T" 8718.58 90.00 184.28 4995.00 5056.90 4454.32 5124.96 -3779.23 -2920.67 6.00 -136.01G -4.38 -4.10 5976725.05 616069.90 N 70.34518751 W 149.05785924 End Cry 8738.13 89.16 183.46 4995.14 5057.04 4473.40 5144.51 -3798.74 -2921.99 6.00 O.OOG -4.32 -4.17 5976705.52 616068.89 N 70.34513421 W 149.05786990 Cry 6/100 10040.71 89.16 183.46 5014.33 5076.23 5742.06 6446.95 -5098.79 -3000.71 0.00 -87.24G 0.00 0.00 5975404.50 616010.83 N 70.34158250 W 149.05850452 S-213AL3 T5 10090.18 89.30 180.50 5015.00 5076.90 5789.94 6496.41 -5148.22 -3002.42 6.00 -87.15G 0.29 -5.99 5975355.05 616009.90 N 70.34144746 W 149.05851824 Well Design Ver 3.1RT-SP3.03-HF5.00 Bld( d031rt-546) S-213IS-213IPlan S-213AL3 OBaIS-213AL3 (P5) OBa Generated 10/6/2004 1 :57 PM Page 1 of 2 Com. 'e1ts Measured I Inclination I Azimuth I Sub·Sea TVD I TVD Vertical I Along HOla NS EW I DLS I Tool Face I Build Rate I Walk Rate I Northing Easting Lat~ude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (It) (It) (degf100 It) (deg) (degf100 It) (degf100 It) (ltUS) (ltUS) 10100.00 89.33 179.91 5015.12 5077.02 5799.36 6506.23 -5158.04 -3002.45 6.00 -87.14G 0.30 -5.99 5975345.23 616010.02 N 70.34142062 W 149.05851850 End Cry 10185.80 89.59 174.77 5015.93 5077.83 5880.36 6592.03 -5243.72 -2998.47 6.00 O.OOG 0.30 -5.99 5975259.63 616015.36 N 70.34118657 W 149.05848592 Cry 6/100 10499.29 89.59 174.77 5018.18 5080.08 6171.48 6905.51 -5555.89 -2969.90 0.00 -89.28G 0.00 0.00 5974947.98 616048.89 N 70.34033377 W 149.05825303 10500.00 89.59 174.73 5018.18 5080.08 6172.14 6906.22 -5556.60 -2969.83 6.00 -89.28G 0.08 -6.00 5974947.27 616048.96 N 70.34033183 W 149.05825250 10600.00 89.67 168.73 5018.83 5080.73 6262.87 7006.22 -5655.51 -2955.45 6.00 -89.24G 0.08 -6.00 5974848.61 616064.91 N 70.34006163 W 149.05813548 10700.00 89.75 162.73 5019.34 5081.24 6348.71 7106.22 -5752.38 -2930.81 6.00 -89.21G 0.08 -6.00 5974752.15 616091.09 N 70.33979702 W 149.05793523 10800.00 89.83 156.73 5019.71 5081.61 6428.74 7206.22 -5846.14 -2896.18 6.00 -89.19G 0.08 -6.00 5974658.96 616127.20 N 70.33954090 W 149.05765394 10900.00 89.92 150.73 5019.93 5081.83 6502.06 7306.22 -5935.77 -2851.93 6.00 -89.18G 0.09 -6.00 5974570.05 616172.86 N 70.33929609 W 149.05729469 8-213AL3 T6 10995.49 90.00 145.00 5020.00 5081.90 6565.09 7401.71 -6016.60 -2801.16 6.00 -90.00G 0.09 -6.00 5974490.05 616224.90 N 70.33907534 W 149.05688251 11000.00 90.00 144.73 5020.00 5081.90 6567.89 7406.22 -6020.29 -2798.57 6.00 -90.00G 0.00 -6.00 5974486.40 616227.55 N 70.33906526 W 149.05686143 11100.00 90.00 138.73 5020.00 5081.90 6625.49 7506.22 -6098.76 -2736.66 6.00 -90.00G 0.00 -6.00 5974408.93 616290.70 N 70.33885094 W 149.05635890 End Cry 11114.80 90.00 137.84 5020.00 5081.90 6633.27 7521.02 -6109.81 -2726.81 6.00 O.OOG 0.00 -6.00 5974398.04 616300.72 N 70.33882077 W 149.05627896 TD 1 4-1/2" Lr,' 12138.77 90.00 137.84 5020.00 5081.90 7165.27 8544.99 -6868.87 -2039.53 0.00 O.OOG 0.00 0.00 5973650.05 616999.90 N 70.33674768 W 149.05070. LeQal Desctiptlon: NorthinQ (y1 IftUSl EastinQ (XI IftUSl Surface 4346 FSL 4500 FEL 835 T12N R12E UM 5980549.84 618929.96 Tie-In 4346 FSL 4500 FEL 835 T12N R12E UM 5980549.89 618929.86 S-' 13AL3 T2 2321 F8L 1796 FEL 534 T12N R12E UM 5978485.05 616389.90 S-213AL3 T3 1365 F8L 2077 FEL 534 T12N R12E UM 5977525.05 616124.90 S-213AL3T4 566 FSL 2146 FEl S34 T12N R12E UM 5976725.05 616069.90 8-213AL3 T5 4477 FSL 2229 FEL S3 T11N R12E UM 5975355.05 616009.90 S-213AL3 T6: 3608 FSL 2029 FEl 53 T11N R12E UM 5974490.05 616224.90 TD 1 BHL : 2757 FSL 1269 FEL S3 T11N R12E UM 5973650.05 616999.90 - Well Design Ver 3.1 RT-8P3.03-HF5.00 Bld( d031 rt-546 ) 8-213IS-213IPlan S-213AL3 OBa18-213AL3 (P5) OBa Generated 10/6/2004 1 :57 PM Page 2 of 2 -294 ······200 "'100 -0 100 200 -294 Field: Prudhoe Bay Site: PB S Pad Well: S-213 Wellpath: Plan S-213A OBd 270 180 I.. Travelling Cylinder Azimuth (TFO+AZI) [deg]vs Centre to Centre Separation [100ft/in] . S-44~S~(ILI)ILlPB I) S-42~1W11J-42PB I) 90 - . Schlumberger Anticollision Report . Comp.ny: YJèÏd: Refer-ence Site: Referebêe Well: Refer-ence Wellp.th: BP Amoco Prudhoe Bay PB S Pad $-213 Plan S-213A OBd D.te: 10/112004 Time: 14:52:27 Page: Co-or-din.te(NE) Refer-ençe: Vertical (fVD) Refer-ence: Well: 8-213, True North S-213APlan 61.9 NO GLOBAL SCAN: Using user- defined selection'" sean cr-iter-ia Inter-polation Method: MD Intel"Val: 50.00 ft Depth Range: 2870.00 to 12149.14 ft Maximum Radius: 10000.00 ft Refer-ence: Er-r-or- Model: Scan Method: Er-r-or- Suñace: Db: Sybase Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing SUl"Vey Pr-ogr-am for- Definitive Wellpath Date: 10/1/2004 Validated: No Venion: 7 Planned Fr-om To SUl"Vey Too1code Tool Name ft ft 155.50 2856.62 Survey #3 MWD+IFR+AK (155.50-6463.17) ~D+IFR:AK MWD + IFR [Alaska] 2856.62 4000.00 Planned: Plan #4 V1 MWD MWD - Standard 2856.62 12149.14 Planned: Plan #4 V1 MWD+IFR+MS MWD + IFR + Multi Station Casing Points MD TVD Diameter- Hole Size Name ft ft In in 2870.00 2838.75 9.625 12.250 9 5/8" 6591.24 5226.90 7.000 8.750 7" 12149.14 5216.90 4.500 6.125 4 1/2" Summary <' Offset Wellpath .,. Refer-ence Offset Ctr--CtI' .No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Waming ft ft ft ft ft PB S Pad Plan S-111 Plan S-111 V5 Plan: PI 2877.85 5250.00 3744.50 49.04 3695.46 Pass: Major Risk PB S Pad Plan S-203 Plan S-203 (East) V3 P 2881.16 3500.00 1771.79 50.71 1721.08 Pass: Major Risk PB S Pad Plan S-203 Plan 8-203 (West) V5 P 2885.78 3000.00 1187.65 47.84 1139.81 Pass: Major Risk PB S Pad Plan S-208 Plan S-208 VO Plan: S- 2870.00 4900.00 3504.21 65.80 3438.42 Pass: Major Risk PB S Pad Plan S-400 S-400 VO Plan: S-400 w 5429.03 5484.70 1009.70 71.70 938.01 Pass: Major Risk PB S Pad Plan S-401 5-401 VO Plan: S-401 w 4323.71 4978.43 1567.05 104.95 1462.09 Pass: Major Risk PB S Pad S-Q1A S-01A V1 4757.90 4850.00 434.56 107.83 326.73 Pass: Major Risk PB 5 Pad S-Q1B S-01B V1 4755.10 4850.00 431.88 107.81 324.07 Pass: Major Risk PB S Pad S-Q1 S-01 V1 4389.20 4450.00 429.06 78.84 350.22 Pass: Major Risk PB S Pad S-Q2APB 1 S-02APB1 V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk PB S Pad S-Q2A S-02A V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk PB S Pad 5-02 S-02 V1 2918.54 2850.00 670.03 42.39 627.64 Pass: Major Risk PB S Pad S-Q3 5-03 V1 3305.22 3450.00 216.58 51.14 165.44 Pass: Major Risk PB S Pad S-Q4 5-04 V1 2871.00 2900.00 760.33 40.84 719.49 Pass: Major Risk PB 5 Pad S-Q5APB1 S-Q5APB 1 V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk PB 5 Pad S-Q5A S-05A V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk PB S Pad S-Q5 S-05 V1 2878.78 2950.00 859.37 45.19 814.18 Pass: Major Risk PB S Pad S-06 5-06 V1 2890.12 3000.00 940.33 41.69 898.63 Pass: Major Risk PB 5 Pad S-Q7A S-07A V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk PB 5 Pad S-Q7 S-07 V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk PB S Pad S-08 5-08 V1 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk PB 5 Pad S-08 S-08A V2 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk PB 5 Pad S-Q8 S-08B V3 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk PB 5 Pad S-09 S-09 V1 2895.57 3150.00 1251.18 45.20 1205.98 Pass: Major Risk PB S Pad S-1oo S-1OO V10 2912.46 3450.00 1762.32 49.87 1712.45 Pass: Major Risk PB 5 Pad S-101 S-101 V3 2938.56 2850.00 760.17 42.65 717.52 Pass: Major Risk PB 5 Pad S-101 S-101PB1 V9 2938.56 2850.00 760.17 42.79 717.38 Pass: Major Risk PB 5 Pad 5-102 S-102V11 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk PB 5 Pad S-102 5-102L1 V5 2881.77 3900.00 1933.31 48.14 1885.17 Pass: Major Risk PB S Pad S-102 S-102L 1PB1 V7 2881.77 3900.00 1933.31 48.10 1885.22 Pass: Major Risk PB 5 Pad 5-102 8-102PB1 V14 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk PB S Pad 5-103 S-103 V6 2881.65 3450.00 1347.35 46.75 1300.61 Pass: Major Risk PB 5 Pad S-104 5-104 V1 2870.00 5400.00 3878.94 44.26 3834.68 Pass: Major Risk PB S Pad S-105 8-105 V5 2883.61 3650.00 1555.81 39.54 1516.27 Pass: Major Risk PB 5 Pad 5-106 5-106 V2 2887.09 3600.00 2068.73 47.39 2021.34 Pass: Major Risk PB 5 Pad S-106 S-106PB1 V12 2887.09 3600.00 2068.73 47.40 2021.33 Pass: Major Risk PB S Pad S-107 5-107 V36 2878.56 3900.00 2301.09 46.30 2254.79 Pass: Major Risk PB 5 Pad 5-108 5-108 V6 2880.80 3050.00 421.07 34.55 386.53 Pass: Major Risk PB 5 Pad 5-109 S-109 V8 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk PB 5 Pad S-109 S-109PB1 V2 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk PB S Pad S-10APB1 S-10APB1 V1 2872.76 3199.96 1348.18 48.50 1299.68 Pass: Major Risk ~-~~~. ~.... -'---_._þ-- . . Schlumberger Anticollision Report Company: BP Amoco Date: 10/112004 Time: 14:52:27 Page: 2 Field: Prudhoe Bay Reference Site: PB S Pad C4Hlrdinate(NE) Reference: Well: 8-213. True North Reftr'enc:e Well: S-213 Vertical (l'VD) Refertnèe: 8-213APlan 61.9 Reference Wellpath: Plan S-213A OBd Db: Sybase Summary <: Offset Wellpath ..,. Reference Offset Ctr-Ctr NUcGo Allowable Site Well Wellpath MD MD DistanctMea Deviation Warning ft ft ft ft ft PB 8 Pad S-10A 8-10A V1 2873.72 3200.00 1347.74 48.40 1299.34 Pass: Major Risk PB S Pad S-10 8-10 V1 2872.76 3.199.96 1348.18 48.50 1299.68 Pass: Major Risk PB S Pad S-110 S-110V18 2870.00 6550.00 4651.88 39.67 4612.21 Pass: Major Risk PB 8 Pad S-112 S-112 V20 2893.00 3150.00 582.00 36.48 545.52 Pass: Major Risk PB 8 Pad S-113 S-113 V14 2893.56 3150.00 1528.06 . 45.75 1482.31 Pass: Major Risk PB 8 Pad S-113 S-113A V3 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk PB S Pad S-113 S-113B V6 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk PB 8 Pad S-114 S-114 V13 2892.01 3300.00 1745.06 47.40 1697.66 Pass: Major Risk PB 8 Pad S-114 S-114A V6 2892.01 3300.00 1745.06 47.25 1697.81 Pass: Major Risk PB 8 Pad S-115 8-115 STV1 Plan: Plan 2922.45 2900.00 811.20 41.17 770.03 Pass: Major Risk PB 8 Pad 8-115 8-115V7 2922.50 2900.00 811.15 41.07 770.08 Pass: Major Risk PB 8 Pad 8-116 8-116V6 2916.24 2800.00 782.12 39.78 742.35 Pass: Major Risk PB 8 Pad 8-117 S-117V4 2926.49 2850.00 492.13 41.03 451.09 Pass: Major Risk PB 8 Pad 8-118 8-118V5 4237.72 4150.00 394.20 67.71 326.49 Pass: Major Risk PB 8 Pad S-119 Plan 8-119A V1 Plan: P 2873.02 4400.00 2971.07 58.88 2912.19 Pass: Major Risk PB S Pad 8-119 S-119 V3 Plan: Plan #4 2873.02 4400.00 2971.07 48.53 2922.54 Pass: Major Risk PB 8 Pad S-11 S-11V4 2886.40 3250.00 1413.56 45.69 1367.87 Pass: Major Risk PB 8 Pad S-11 S-11A V1 2886.89 3250.00 1413.87 45.70 1368.17 Pass: Major Risk PB 8 Pad 8-11 8-11BV1 2887.16 3250.00 1414.05 45.70 1368.34 Pass: Major Risk PB 8 Pad S-120 S-120 V4 2942.39 3000.00 1217.48 43.83 1173.65 Pass: Major Risk PB 8 Pad 8-123 S-123 V10 2876.04 3150.00 1457.13 40.64 1416.49 Pass: Major Risk PB 8 Pad S-12A S-12A V1 2879.26 3300.00 1609.60 41.35 1568.25 Pass: Major Risk PB 8 Pad S-12 S-12 V1 2876.24 3350.00 1673.36 43.57 1629.79 Pass: Major Risk PB 8 Pad S-13 S-13 V1 2883.15 3350.00 1748.65 46.55 1702.10 Pass: Major Risk PB 8 Pad S-14 Drilling091604 S-14A V 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk PB 8 Pad 8-14 S-14 V5 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk PB 8 Pad S-15 S-15 V2 3609.09 3600.04 761.47 63.88 697.59 Pass: Major Risk PB 8 Pad S-16 S-16 V1 3786.80 3750.00 865.48 81.27 784.21 Pass: Major Risk PB 8 Pad S-17 S-17 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk P8 8 Pad 8-17 S-17A V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 8 Pad S-17 8-17AL1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 8 Pad S-17 S-17APB1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 8 Pad S-17 S-17B V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 8 Pad S-17 S-17C V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk PB 8 Pad S-17 S-17CPB1 V2 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk PB 8 Pad S-17 S-17CPB2 V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk PB S Pad S-18 S-18 V1 2912.30 2650.00 2187.88 61.21 2126.67 Pass: Major Risk PB 8 Pad S-18 S-18A V16 2921.24 2650.00 2189.46 61.44 2128.02 Pass: Major Risk PB S Pad S-19 S-19 V1 3107.07 3050.00 609.87 49.07 560.80 Pass: Major Risk PB S Pad S-200PB 1 S-200PB1 V4 2877.44 2950.00 297.53 43.84 253.69 Pass: Major Risk PB S Pad S-2OO S-200 V2 2877.44 2950.00 297.53 43.95 253.58 Pass: Major Risk PB S Pad 8-201 S-201 V2 2873.65 3700.00 1590.52 43.80 1546.72 Pass: Major Risk PB S Pad 8-201 S-201PB1 V11 2879.52 3700.00 1587.91 45.59 1542.32 Pass: Major Risk PB 8 Pad 8-20 S-20 V4 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk PB 8 Pad 8-20 S-20A V2 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk PB 8 Pad S-213 S-213 V9 3046.08 3050.00 4.72 40.77 -36.05 FAIL: Major Risk PB 8 Pad S-215 S-215 V9 8660.10 6930.00 1126.17 129.52 996.66 Pass: Major Risk PB 8 Pad S-216 S-216 V2 2896.92 2900.00 802.63 42.17 760.46 Pass: Major Risk PB 8 Pad 8-21 S-21 V1 3203.91 3300.00 720.37 54.95 665.42 Pass: Major Risk PB 8 Pad 8-22A S-22A V1 3366.54 3350.00 596.94 57.10 539.84 Pass: Major Risk PB 8 Pad 8-22B 8-22B V2 3366.54 3350.00 596.94 57.21 539.73 Pass: Major Risk PB S Pad S-22 S-22 V1 3366.59 3350.00 596.67 57.12 539.54 Pass: Major Risk PB 8 Pad S-23 8-23 V1 3246.07 3300.00 665.69 52.31 613.38 Pass: Major Risk PB 8 Pad 8-24 S-24 V5 2966.51 3000.00 744.00 42.81 701.19 Pass: Major Risk PB 8 Pad 8-24 S-24A V1 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk PB S Pad 8-24 8-24B V2 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk PB S Pad 8-25APB1 8-25APB1 V2 2881.08 3050.00 745.08 67.79 677.28 Pass: Major Risk PB 8 Pad S-25A S-25A V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk PB S Pad S-25 S-25 V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk PB S Pad 8-26 8-26 V1 2889.85 2950.00 833.32 38.07 795.25 Pass: Major Risk PB 8 Pad S-27 S-27 V1 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk PB S Pad 8-27 8-27 A V3 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk PB 8 Pad 8-27 8-278 V7 2875.81 2950.00 869.73 37.73 831.99 Pass: Major Risk ._---..--_._--..-#.~.~_....- ..,- . Schlumberger . Anticollision Report Company: BP Amoco Date: 10/112004 Time: 14:52:27 Page: 3 Field: Prudhoe Bay Refer-enee Site: PB S Pad Co-or-dinate(NE) Refer-cnee: Well: S-213, True North Refer-eote Well: 8-213 Vertical (I'VD) Refer-ente: 8-213A Plan 61.9 Refer-cnec Wellpath: Plan 8-2t3A OBd Db: 8ybase SummaI")' < Offset Wellpath ~ Refer-cnee Offset Cu--ctr- No-Go Allowable Site Well Wcllpath MD MD Distance Ar-ea Dcviation War-ning ft ft ft ft ft PB 8 Pad 8-28 8-28 V4 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk PB S Pad 8-28 8-28A V1 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk PB 8 Pad 8-28 8-28B V2 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk PB 8 Pad 8-28 S-28BPB 1 V7 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk PB S Pad 8-29AL 1 S-29AL1 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk PB S Pad 8-29A Plan 8-29AL2 VO Plan: 2900.27 3050.00 1429.74 57.24 1372.50 Pass: Major Risk PB S Pad S-29A S-29A V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk PB 8 Pad S-29 Plan 8-29B V1 Plan: S- 2900.27 3050.00 1429.74 57.34 1372.40 Pass: Major Risk PB 8 Pad S-29 8-29 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk PB 8 Pad S-30 8-30 V1 2900.00 3050.00 1016.14 38.62 977.52 Pass: Major Risk PB 8 Pad S-31A S-31A V3 3224.79 3700.00 755.81 64.61 691.20 Pass: Major Risk PB 8 Pad S-31 8-31 V1 3224.79 3700.00 755.81 64.61 691.20 Pass: Major Risk PB 8 Pad S-32 8-32 V1 2889.28 3200.00 1300.39 45.96 1254.43 Pass: Major Risk PB S Pad S-33 8-33 V1 2900.00 3100.00 1162.82 39.24 1123.58 Pass: Major Risk PB 8 Pad S-34 S-34 V1 2879.25 3200.00 1439.74 36.64 1403.10 Pass: Major Risk PB S Pad S-35 S-35 V1 2874.27 3550.00 1411.58 56.50 1355.08 Pass: Major Risk PB S Pad 8-36 8-36 V1 2876.35 3300.00 1489.80 38.52 1451.28 Pass: Major Risk PB S Pad S-37 S-37 V1 2880.94 3350.00 1567.21 39.45 1527.76 Pass: Major Risk PB 8 Pad S-38 S-38 V1 2876.14 3150.00 1268.58 36.10 1232.48 Pass: Major Risk PB S Pad S-40A 8-40A V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk PB 8 Pad S-40 8-40 V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk PB S Pad S-41L1 S-41L1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk PB 8 Pad S-41PB1 S-41PB1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk PB S Pad S-41 S-41 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk PB S Pad S-42PB1 S-42PB1 V1 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk PB S Pad 8-42 S-42 V2 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk PB 8 Pad 8-43L 1 S-43L 1 V2 2870.79 3150.00 647.04 38.61 608.42 Pass: Major Risk PB S Pad S-43 S-43 V3 2870.79 3150.00 647.03 38.50 608.53 Pass: Major Risk PB S Pad S-44L 1PB1 8-44L 1PB1 V3 2896.64 2950.00 199.72 35.01 164.72 Pass: Major Risk PB S Pad S-44L 1 8-44L 1 V5 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk PB S Pad S-44 S-44 V10 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRlA TE LETTERJP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELLNAME¡?1ú ~- 213~ ¿2 PTD# 2Q~ - 2-/ ¡:; x Development Service CHECK Wß..A T APPLIES ADD-ONS (OPTIONS) MULTI LATERAL x (If APJ number last two. (2) digits are between 60-69) Exploration Stratigraphic ~'CLUEn Tbe permit is for a new weUboresegmeDt of I existiDgwen~a ~-~/3A . Permit No;;'~- ?/?API No. ..'Ý::>-I'J/fi-.2-"2-79'~-"ðl Production. should continue to be reponed as a function 'of tbe original API number. stated above. HOLE JD accordaDce witb· 20 AAC 25.005(1), an records, data aDd logs acquired for tbe pilot hole must be clearly differentiated "in both name (name OD permit plus PH) and API number (SO 70/80) from records, data aDd logs acquired for well (name on permit). Pn.,OT (PH) SPACING EX CEPTJ ON DRY DITCH SAMPLE The permit is approved subject ·to fuD comp1iaDce with 20 AAC 25.055~ Approval to perforate aDd produce is contingeDt upon issuance of ~ conservation order approving a spacing e:Jcepdon. _ (Company Name) assumes tbe liability of aDY protest to the spaciDg .eJception tbat may occur. AU dry ditch sample sets submitted to tbe Commission must be in no greater 1ban 30' sample intervals from below tbe permafrost or from where samples are first caught aDd 10' sample inter-vals through target zones. ~i!!'~~~'" .~ Field & Pool PRUDHOE BAY. POLARIS OIL - 640160 Administration Well Name: PRUDHOE BAY UN POL S-213AL2 PTD#:2042160 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L GeoArea 890 Unit 11650 1 Permittee attache~t _ _ . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2 _Lease_number _apRropriale _ _ _ _ _ _ _ . _ _ _ _ Yes _ 3 _U_nique well_n_a!T1e_a[1d olÆmb_er _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . _ . _ _ _ _ _ _ _ . _ . _ . . . _ _ Yes _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . . . . . . _ _ _ _ _ _ _ _ . _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ . . _ . _ . _ 4 WellJQcated in.a.d.efjoedpool . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ . . . . . . Yes SEE ,t\PD fORS-2123A 204:213 fORADISGU.SSIQN Of SP,t\CING, _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . . 5 WellJQcated pr.oper distance_from driJling unitb_ound_ary _ _ _ _ _ _ _ _ _ . . . . . . . _ Yes _ . _ _ _ . _ . . . . . . . . . . . _ . _ _ . . . . 6 WelUQcated proper distance_ from otber weUs. . . . _ . . . . . . . . . . . . . . _ _ _ _ _ _ _ _ _ Yes _ . . _ . . . . _ . _ . . . . . _ _ _ _ _ _ _ _ _ _ . . . . . .. ·...... _ . . . . . . _ _ _ _ 7 .S_uffjcientacreage_aYailablein drilliogunjL . _ _ _.... _.. .Yes. . _ _ _ _ _ _ _ _.. _. _....... _. ....._ 8 Jfdevi<!ted. js. weJlbQre platjoclu.ded . . . . _ _ . Yes. . . . . . . . _ . . . . . . . . . . . _ _ _ _ _ _ _ _ _ _ _ . . . . . 9 _Qperator onl}' affected party. . . . . . . . . _ . . . _ . . . _ _ _ _ _ _ _ _ _ _ . _ _ _ . . Yes _ . _. ... . . _ . _ . . . . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ 10 _Operator bas.appropriate.b.ond inJorce . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ . _ _ _ _ . . _ _ _ . . Yes _ _ _ _ _ . . _ . . _ _ . _ _ _ _ _ . _ _ _ _ _ _ . _ . . _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . 11 Permit c.a[1 Þe iSSlÆed witbQut co.nservaJioo order _ . . .Yes . Appr Date 12 Permit c.al1 Þe iSSlÆed witbQut admioistratilleapprpvaJ _ . _ . _ _ . . . . . . . Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . . . RPC 10/26/2004 13 Can permit be approved before 15-day wait Yes 14 WellJQcated within <!rea and strata .authorized byJl1jectioo Order # (putlO# in_cpm!T1.el1tsUfor. Yes. . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . 15 _AJI wellsJlvitNnJI4J'uile_area_of review ideotified (For servjc.ew.e!l ool}'L _ _ _ . _ _ _ . _ _ _ _ _ _ Yes _ _ _ _ _ . . . _ . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ . . 16 Pre-produ.ced injector; ~uraliQn.of pre-pro~uctioo less than 3 mootbs. (for_service well onJy) _ . Y.es _ . . _ . . . . . . . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ . . . . . . . . _ . _. _. _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . . 17 .AGMP Fïnding ofCon,Si,Slencyhas Þeenissuedfor!bis project _... _ . . _ . _ . . . . . Yes _ . . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ . . . . _ . . . . . . _ . 18 .C.ol1du.ctor stöngprQvided _ _ . _ _ . . . . . . . .NA _ . . . . . .. .... _ _ . . _ _ . _ _ _ 19 _S_ul'facec<!singpJotects alLknown USDWs _ . _ . . _ . . . . . . . . . . . . NA _ _ . . . . _ _ . . _ . . . . . . _ . . . _ . 20 _CMT v_ol adeQlÆate!o circulateo_ncooductor. & SUJtCJ>g . . . . . . . . . . _ . . _ _ _NA _ _ _ _ . . . . . . . . . . _ . 21CMT vol adeQuate!o tie-inJongstril1g tosul'f csg . . . _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . . . . _ _ _ . . . _ . . . . . _ . 22 _CMT will coyer_aU kOQwn.pro.ductiYe bQri~ons. _ . _ . . . . _ _ _ _ _ _ _ _ _ _ No_ _ _ . _ _ . . Slotte.dc . . . . . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ . _ . . . . . . _ _ . . _ . . _ _ . . . . _ _ _ _ _ _ _ _ . _ . _ . . 23 .C_asil1g de.sig[1S adeç ua_te for C.J:, B .&. permafr.ost _ Yes. _ .. ...... _ . . _ . _ _ _ _ _ _ _ _ _ _ . . . _ . . . . _ . . . . . . . . _ _ _ _ . . . . . _ 24 A~equaletankage_oJ re_serve pit. _ _ _ . _ _ _ _ . _ _ . . . . . . . . . . . . _ .. _ _ . . _ . _ _ Yes _ _ _ _ _ _ . Doypo 16. _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . . . _ . . . . . _ . . . _ _ _ _ _ _ _ . . 25 JtaJe-~rilt has a 10-403 fQr abandonment beel1 aPPJoved _ _ . . _ . _ _ _ _ _ _ _ _ . . . . . . . NA . . _ . . La_ter<!1. _ _ _ _ _ _ _ . _ . . _ _ . . . _ _ . . _ _ . . . . . 26 A~equale-,^"e!lbore sep<!ratio_n_proposed. _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . Yes _ _ _ _ . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . . 27 Jtdiv~nter req.uired, dQes it meel reguJatioos_ . . . _ . _ _ _ NA . _ . . _ . . Sidetrack. _ _ _ _ _ _ _ _ . . . _ . .. . _ . . . . . . _ . . _ _ _ _ _ _ _ _ _ _ _ . . . . . . . Appr Date 28 _DritliogfJuid.Rrogramsc.hematic.&eq.uipJistadequale _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Yes_ _.... . Max MW_9,2RP9. _..... _.. _ _..... _ _. _ _.... _. WGA 10/26/2004 29 BOPEs, do they meelreguJatioo _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . . . . . _ . _ . . _ _ . . . . Yes _ _ _ . _ _ . . . . . . . . . . . . 30 _BOPE-Pfessra.til1gappropriate;Jestto.(pu_tpsigin_commeots). _ _ _ Yes _. _.. . Test tp.3500_Rsi.MSf> 1807psÎ. .... _ _.. _ _...... _._ 31 _C_hoke.manifold compJies. w/APtRf>-53 (May 84) . _ . Yes. . . . . . . . . . . . _ _ _ _ _ _ _ _ _ _ . . . . . . . . _ _ _ _ _ . _ . . 32 WQrk will occ.ur withoutoperatjonshlÆtdown_ _ _ _ _ _ _ _ _ _ _ . _ _ . . Yes. . . . . . . . . . . . _ _ _ _ _ . _ . . _ . _ . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . _ . _ . . _ _ . . 33 JSRresence.QfH2Sg<!s.Rrob.aÞle. . _ _ _ _ _ _ _ _ _ _ _. _ .. No... _.. _ .f'JoLa[1H2Sp<!d. ...... 34 MecbanicaLcoodjt[o[1 pf wells within ,t\OR verified (for.s.ervice welJ onJy) . _ _ _ _ _ NA . . . . . _ _ _ . _ _ _ _ _ _ _ _ _ . . . . _ _ Program DEV OnlOff Shore On Well bore seg Annular Disposal D D - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . Engineering - - - - - - - - - - e - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - Appr RPC 35 36 Date 37 10/26/2004 38 39 Permit G.a[1 Þe iSSlÆed w!o. hydrogen. s.ulfide meas.ures. . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes. _ _ . . . . . . . . . . .. _. _ _ _ _ _ _ . _ . . . . . . . _ . _ . . . . . . . . _ . . . _ _ . _D_ata.preseoted on Rote_ntial overRressure .zone,S _ _ _ . . . _ . _ . . . . . NA . . . . . . . _ . _ . . . . . . . . _ . . _ . . _ _ . . . . . . . _ _ _ _ _ _ _ _ . _ _ _ . . .Sei'smic.afl<!lysjs. Qf shaJlow gaszPl1es. . _ . _ . . . . . . . . . . . . . . . . _ _ . . . .NA . . . . . . . . . . _ _ . . . . . . . . _ . _ _ . . _ . . . . . . Seabedconditioo SlÆrvey(if off-shore) . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . NA . . . . _ . . . . . . . . . . . _ . _ . . . . . . . . . . . _ . _ . . . . . . . . . . . . . . _ . . . _ CQnta.ct nam.elphQneJor.wee~ly progress.reRorts [exploratoryol1ly] . _ _ _ _ _ _ _ _ . . . . . . . NA _ _ . . . . . . . . . . . . . _ . . . . _ _ . . . . . . . . . . . . . . _ _ - - - - - - - - - - Geology - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - Geologic Commissioner: Date: Engineering Commissioner: Date AC ~~"e' Date Ow ) Ò )2)~ ~~}C