1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU S-213AL2
Change Out Solid Iso Sleeve
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
204-216
50-029-22993-62-00
12100
Conductor
Surface
Intermediate
Production
Liner
5069
80
2831
6082
5567
11664
20"
9-5/8"
7-5/8"
4-1/2"
5066
30 - 110
28 - 2859
24 - 6106
6055 - 11665
30 - 110
28 - 2829
24 - 5104
5082 - 5066
6760
520
3090
4790
7500
None
1530
5750
6890
8430
6267 - 11622
4-1/2" 12.6# L-80 22 - 5961
5144 - 5065
Structural
4-1/2" Baker Premier Packer
5844
4977
Torin Roschinger
Operations Manager
Tyson Shriver
Tyson.shriver@hilcorp.com
907-564-4542
PRUDHOE BAY, Polaris Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028253
22 - 5038
N/A
N/A
763
880
2612
2711
603
887
1050
1000
600
560
N/A
13b. Pools active after work:Polaris Oil
No SSSV Installed
5844, 4977
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 9:48 am, Dec 12, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.12.12 06:54:20 -
09'00'
Torin Roschinger
(4662)
WCB 2-6-2025 DSR-12/16/24
RBDMS JSB 122624
ACTIVITY DATE SUMMARY
12/2/2024
***WELL S/I ON ARRIVAL*** (Profile modification)
RAN 3.50" CENT & 3" SAMPLE BAILER TO ISO SLEEVE AT 6,108' MD (bailer
empty - fresh marks on bottom)
***CONTINUE ON 12/3/24 WSR***
12/3/2024
T/I/O = 989/935/456 LRS 46. Assist Slickline (PROFILE MODIFICATION) Pumped
155 bbls 190* Crude into TBG to assist SL w/ B&F. Pumped 124 bbls Crude at rate to
help SL down hole. ***Job Continued to 12-04-2024***
12/3/2024
***CONTINUED FROM 12/2/24 WSR*** (Profile modification)
RAN 4-1/2" GS TO RESTRICTION AT 5,867' SLM (worked down to 5,879' slm - tools
stick)
RAN 4-1/2" BRUSH & 3.60" GAUGE RING TO ISO SLEEVE AT 6,098' SLM/ 6,108'
MD (LRS pumped 110 bbls hot crude)
PULLED ISO SLEEVE AT 6,098' SLM/ 6,108' MD (pkg slightly torn)
RAN 4-1/2" BRUSH & 3.60" GAUGE RING TO BRUSH LEMS L3 & L2
RAN ISO SLEEVE TO 6,092' SLM (unable to get deeper)
PULLED ISO SLEEVE AT 6,092' SLM
RAN 4-1/2" BRUSH & 3.60" GAUGE RING TO 5,974' SLM (unable to work past)
RAN 4-1/2" BRUSH, 3.50" CENT & BULLNOSE TO BRUSH LEMS L3 & L2 (LRS
pumped 50 bbls crude)
SET ISO SLEEVE AT 6,098' SLM/ 6,108' MD
***CONTINUE ON 12/4/24 WSR***
12/4/2024
***Job Continued from 12-03-2024*** LRS 46 (PROFILE MODIFICATION) Assist as
directed. Slickline in control of well and Pad-Op notified upon LRS departure.
12/4/2024
***CONTINUED FROM 12/3/24 WSR*** (Profile modification)
RAN 4-1/2" GS TO ISO SLEEVE AT 6,098' SLM/ 6,108' MD (jarred down 15 min - no
movement)
***WELL LEFT S/I ON DEPARTURE***
Daily Report of Well Operations
PBU S-213A
)
SET ISO SLEEVE AT 6,098' SLM/ 6,108' MD
RAN ISO SLEEVE TO 6,092' SLM (unable to get deeper)
()
RAN 4-1/2" GS TO ISO SLEEVE AT 6,098' SLM/ 6,108' MD (jarred down 15 min - no
movement)
()
PULLED ISO SLEEVE AT 6,098' SLM/ 6,108' MD
P
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU S-213AL2
Set Solid Iso Sleeve
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
204-216
50-029-22993-62-00
12100
Conductor
Surface
Intermediate
Production
Liner
5069
80
2831
6082
5567
11664
20"
9-5/8"
7-5/8"
4-1/2"
5066
30 - 110
28 - 2859
24 - 6106
6055 - 11665
30 - 110
28 - 2829
26 - 5104
5082 - 5066
6760
520
3090
4790
7500
None
1530
5750
6890
8430
6267 - 11622
4-1/2" 12.6# L-80 22 - 5961
5144 - 5065
Structural
4-1/2" Baker Premier Packer
5844
4977
Torin Roschinger
Operations Manager
Tyson Shriver
Tyson.shriver@hilcorp.com
907-564-4542
PRUDHOE BAY, Polaris Oil
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028253
22 - 5038
N/A
N/A
879
1398
2649
3422
2145
1598
1250
1200
640
498
N/A
13b. Pools active after work:Polaris Oil
No SSSV Installed
5844, 4977
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 10:48 am, Nov 19, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.11.19 05:28:39 -
09'00'
Torin
Roschinger
(4662)
WCB 2-7-2025
RBDMS JSB 112724
DSR-11/21/24
ACTIVITY DATE SUMMARY
10/18/2024 LRS Well Test Unit #6, Begin WSR on 10/18/24, SLBU, Continue WSR on 10/19/24
10/19/2024
LRS Well Testing Unit #6, Continue WSR from 10/18/24, SLBU, Continue WSR on
10/20/24
10/20/2024
LRS Well Testing Unit #6, Continue WSR from 10/19/24, SLBU, Continue WSR on
10/21/24
10/21/2024
LRS Well Testing #6, Continue WSR from 10/20/24, SLBU, Continue WSR on
10/22/24
10/22/2024
LRS Well Testing Unit #6, Continue WSR from 10/21/24, SLBU, Continue WSR on
10/23/24
10/23/2024
LRS Well Testing Unit #6, Continue WSR from 10/22/24, SLBU, Continue WSR on
10/24/24
**** H2S Drill Performed****
**** Man Down Drill Performed ****
**** Well Control Drill Performed****
10/24/2024
S-100 Freeze Protect outlet well FL with 6 bbls 60/40 LRS testers in control of well
upon departure
10/24/2024
LRS Well Test Unit #6, Continue WSR from 10/23/24, Well Test, Flowback, Continue
WSR on 10/25/24
10/24/2024
***WELL FLOWING ON ARRIVAL***
GAUGED 3.78" TO 5982' MD.
RAN 3" PUMP BAILER TO BAKER PORTED ISO SLEEVE @ 6108' MD (EMPTY).
DRIFTED CLEANLY W/ 10' x 3.50" PUMP BAILER TO PORTED ISO SLEEVE @
6108' MD.
DRIFTED CLEANLY W/ 2.25" CENT, AND 1.75" SAMPLE BAILER TO DEVIATION
@ 6380' SLM.
***WSR CONTINUED ON 10-25-24***
10/25/2024
***CONTINUED FROM 10-24-24***
PULLED 4 1/2" BAKER PORTED ISO SLEEVE FROM 6108' MD.
***WELL S/I ON DEPARTURE***
10/25/2024
LRS Well Test Unit #6, Continue WSR from 10/24/24, Well Test, Flowback, Continue
WSR on 10/26/24
10/25/2024
***WELL FLOWING ON ARRIVAL***
R/U SLICKLINE.
***CONTINUED ON 10-26-24***
10/25/2024 TFS Unit 1 Assist Slickline (Brush and Flush) ***JOB CONTINUES to 10-26-2024***
10/26/2024
***CONTINUED FROM 10-25-24***
SET 4 1/2" BAKER TYPE 2 ISO SLEEVE (3.67" OD, 2.57" ID, TYPE 2 KEY, 19'
OAL) ACROSS L2 (OBa) @ 6,108' MD
TAGGED TOP OF ISO SLEEVE @ 6,108' MD & JARRED DOWN TO CONFIRM
SET
***WELL HANDED BACK TO TESTERS***
10/26/2024
T/I/O= 825/1050/500 TFS Unit 1 Assist Slickline (Brush and Flush) Pumped 150
BBLS of Crude to Assist Slickline down hole. Slickline in control of well upon
Departure. FWHP=0/1050/500
10/26/2024
LRS Well Test Unit #6, Continue WSR from 10/25/24, Well Test, Flowback, Continue
WSR on 10/27/24
10/27/2024
LRS Well Test Unit #6, Continue WSR from 10/26/24, Well Test, Flowback, Continue
WSR on 10/28/24
Daily Report of Well Operations
PBU S-213A
SET 4 1/2" BAKER TYPE 2 ISO SLEEVE (3.67" OD, 2.57" ID, TYPE 2 KEY, 19'
OAL) ACROSS L2 (OBa) @ 6,108' MD
Daily Report of Well Operations
PBU S-213A
10/28/2024
LRS Well Test Unit #6, Continue WSR from 10/27/24, Well Test, Flowback, Continue
WSR on 10/29/24
10/29/2024
LRS Well Test Unit #6, Continue WSR from 10/28/24, Well Test, Flowback, Divert
Into WPS, Continue WSR on 10/30/24
10/30/2024
LRS Well Test Unit #6, Continue WSR from 10/29/24, Well Test, Flowback, 12 Hr
PBWT, RDMO, ,END WSR on 10/30/24 JOB COMPLETE
· .
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
c2 Q IJ - Q 10 Well History File Identifier
Organizing (done)
o Two-sided 111111111111111111I
o Rescan Needed III 11111111 II 11111I
RESCAN
DIGITAL DATA
¢'Diskettes, No. ,
o Other, NolType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Color Items:
o Greyscale Items:
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Date L/- J¡ :J-/O 7
Date LfjlJ-/fJ 7
:3 X30=QO
Date Lf- /1 f}- / !J1
o Other::
{YIP
,:111111111I1111111 m P
BY: ~
/5/
Project Proofing
BY: ~
Scanning Preparation
BY: ~
+ (P = TOTAL PAGES q to
(Count does not include cover sheet) VVl.. P
/5/
ProducffonScanning
1111111111111111111
Stage 1 Page Count from Scanned File: q 7 (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: VYES
BY: ~ Date: 4/ /8-/07 /5/
NO
mP
Stage 1
If NO in stage 1, page(s) discrepancies were found:
YES
NO
BY:
Maria
Date:
/5/
1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
/5/
Comments about this file:
Quality Checked
111111111111 111111I
10/6/2005 Well History File Cover Page.doc
• •
-- -
. ~ ~~
03~0~12oos
DO NOT PLACE
~:.
~.~:r~
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\C~+rPgs_Inserts\Milcmfilm RRarker.~c
)~
DATA SUBMITTAL COMPLIANCE REPORT
3/12/2007
Permit to Drill 2042160
Well Name/No. PRUDHOE BAY UN POL S-213AL2
Operator BP EXPLORATION (ALASKA) INC
MD 12100~' TVD 5069'/ Completion Date 2/3/2005../
Completion Status 1-01L
Current Status 1-01L
---------, ~_...''''''--'--------'------'-''--- --.. ----------~~-"._-
-------~--~-----.---
-------~ ~-- ~---------------
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
-----------------
___on,
,,- - --- ------~---_...
~-_._----------~---
--- --.- -----------..---.--
--------------------.
DATA INFORMATION
Types Electric or Other Logs Run: MWD 1 GR I RES 1 Azimuthal Den 1 NEU 1 AIM 1 PWD
Well Log Information:
.5>h)",6 '-t J",Aùð y-
API No. 50-029-22993-62-00
UIC N
----------
----------
._----------~-----
(data taken from Logs Portion of Master Well Data Maint
Logl Electr
Data Digital Dataset
!i&e Med/Frmt Number Name
._-
< D D Asc Directional Survey
~t Directional Survey
~g 14323 I nd u ction/Resistivity
¡jOg. 14323 I nduction/Resistivity
~ C Lis 14323 I nd u ction/Resistivity
I.
Well Cores/Samples Information:
Name
Log Log Run
Scale Media No
Interval OHI
Start Stop CH Received
0 12100 4/1/2005
0 12100 4/1/2005
2856 12100 Open 1/10/2007
2856 12100 Open 1/10/2007
2856 12100 Open 1/10/2007
---~---------- ---------
Sample
Set
Number Comments
25 Blu
~rBlu
.-- ~._------------~--
Interval
Start Stop
Sent
Received
ADDITIONAL INFORMATION
Well Cored? yX])
Chips Received? Ynï
Daily History Received?
'Q)N
(Y)I N
Formation Tops
Analysis
Received?
'f-Ho-
----._-- .- -. - -----------------,---
-- -~-------.._- --,-~-------~-----
Comments:
Compliance Reviewed By:
~
...---
Date: ~~-i¥--cX ð ~¿-----
II
Comments
------------- .
MD Vision Service FINAL
8-Jan-2005
TVD Vision Service FINAL
8-Jan-2005
LIS Veri w/Graphics
-
-- - ~--------
Schlumberger
Sch'umberger~DCS
2525 Gambell St. Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
L-212
S·213AL1
S-213AL1-01
S-213AL2
S-213AL3
:;)D'--/- ~/ Co tf 1'13;;)3
Job #
Log Description
11039112 CH EDIT USIT (PDC·GR)
40011201 OH EDIT MWD/LWD
40011201 OH EDIT MWD/LWD
40011201 OH EDIT MWD/LWD
40011201 OH EDIT MWD/LWD
PLEASE ACKNOWLEOGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Explorahon (Alaska) Inc
Petrotechnical Data Center LR2-1
900 E Benson Blvd
Anchorage AK 99508·4254
Date Delivered
04/18105
12/20104
12/25/04
01108/05
01127/05
01108107
NO. 4105
Company: Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Polaris
Orion
Date
Color
BL
CD
2
2
2
2
.
Schlumberger-DCS
2525 Gambell St. Suite 400
Anchorage, AK 99503~2838
A TTN Beth
Received by
.
.
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman
Well No S-213AL2 Date Dispatched: 10-Mar-05
Installation/Rig Doyon 16 Dispatched By: 0
Data No Of Prints No of Floppies
Surveys
2
Received By:
1~~ ælLJ
Please sign and return to:
Drilling & Measurements LWD Division
3940 Arctic Blvd, Suite 300
Anchorage, Alaska 99503
nrose1@slb.com
Fax: 907 -561-8417
LWD Log Delivery V1.1, 10-02-03
Schlumberger Private
ÄOL(~~(G
. STATE OF ALASKA .
ALASK L AND GAS CONSERVATION COMI . ION
WELL COMPLETION OR RECOMPLETION REPORT AND LptE CE IVED
MAR 1 0 7005;
1b. Well Class:
AIIS~süt~_
o StraWH~Ric D,§ë'r\}l~ê' ..
12. Permit tõ'ð~M~umber
204-216
13. API Number
50- 029-22993-62-00
14. Well Name and Number:
PBU S-213AL2
15. Field I Pool(s):
Prudhoe Bay Field / Polaris Pool
No. of Completions
1a. Well Status: IS! Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD / GR I RES I Azimuthal Den I NEU / AIM / PWD
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE
lOP BoTTOM Top BOTTOM SIZE
Surface 110' Surface 110' 30"
28' 2859' 28' 2829' 12-1/4"
24' 6108' 24' 5104' 8-3/4"
6055' 11665' 5082' 5066' 6-3/4"
o GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface: .
4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM
Top of Productive Horizon:
2848' NSL, 1369' WEL, SEC. 34, T12N, R12E, UM (OBb)
Total Depth:
2605' SNL, 1291' WEL, SEC. 03, T11 N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 618930 y- 5980550 Zone- _AS~~__.
TPI: x- 616807 y- 5979018 Zone- ASP4
Total Depth: x- 616979 y- 5973568 Zone- ASP4
-------------------~--- ._~-------------------
18. Directional Survey IS! Yes 0 No
22.
CASING
SIZE
WT. PER FT.
94#
40#
29.7#
12.6#
GRADE
L-80
L-80
L-80
L-80
20"
9-5/8"
7-5/8"
4-1/2"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Section
MD TVD MD TVD
6267' - 11622' 5144' - 5065'
One Other
5. Date Comp., Susp., or Aband.
2/3/2005
6. Date Spudded
114/2005
7. Date T.D. Reached
1/8/2005
8. KB Elevation (ft):
61.82'
9. Plug Back Depth (MD+ TVD)
12100 + 5069
10. Total Depth (MD+ TVD)
12100 + 5069
11. Depth where SSSV set
(Nipple) 2255' MD
19. Water depth, if offshore
N/ A MSL
24.
SIZE
4-1/2", 12.6#, L-80
Ft
Ft
16. Property Designation:
ADL 028253
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
CEMENTING AËCORD
260 sx Arctic Set (Approx.)
440 sx AS Lite III, 215 sx Class 'G'
229 sx Class 'G'
Uncemented Slotted Liner
AMOUNT
PULLED
TUBING RECORO
DEPTH SET (MD)
5961'
PACKER SET (MD)
5844'
25.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
OIL-BBL GAs-McF WATER-BBL
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect wi 100 Bbls of Diesel
GAs-McF
WATER-BBL
26.
Date First Production:
March 8, 2005
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED +
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
OIL -BBL
None
.~þ~-
. ~v~p~.¡:;'Fr
;. "~,
OR'\Giì\ i\L
¡ \ \\1 /-\ c.
Form 1 0-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
CHOKE SIZE I GAS-OIL RATIO
OIL GRAVITy-API (CORR)
RBDMS BFl MAR 1 4 Z005
CJ
28.
GEOLOGIC MARKER.
29.
.RMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OBb
6239'
5140'
None
Schrader Bluff eBb
6519'
5139'
Schrader Bluff eBb
7011'
5103'
Schrader Bluff eBb
7099'
5093'
30. List of Attachments: Summary of Daily Drilling Reports. Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~.J~ Title Technical Assistant Date œ -{ D"'05
PBU S-213AL2 204-216 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Michael Triolo, 564-5774
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
Submit Original Only
S-213A MDT
Client BP Exploration Inc Tool pa/psllf/sc/ ':Jo/sc/po/sc/sc/ms/pc
Well S-213A Spec D,weather
Date 11/29/04 SO
File Time Depth Zone Tool TVD Temp Pretest Mob Before Formation After Flow presÚre PurllpV pumptirTle TestTvpe/cômment
5 12:14 5176 ps 90 20 2296 2158 2295 tool check
7 correlation 15
8 correlation
19 14:30 5531 Mb1 ps 94 20 2.4 2340 2293 2339 ¡¡ood test
21 15:00 5630 Mb2 ps 94 20 2387 lost seal could not hold set persure
22 15:20 5631 Mb2 ps 94 20 2383 lost seal could not hold set persure
24 15:30 5728 Mc ps 95 20 4.1 2425 2198 2411 ¡¡ood test
25 1600 5744 Mc ps 95 20 2425 lost seal could not hold set persure
26 16:15 5745 Mc ps 96 20 2418 2414 lost seal
27 16:29 5747 Mc ps 96 20 108.2 2427 2200 2416 ¡¡ood test
28 16:50 5748 Nb ps 96 20 2449 los seal
29 17:03 5849 Nb ps 96 20 17.1 2446 2114 2443 ¡¡ood test
30 17:30 6000 Oa ps 97 20 38.9 2492 2081 2483 ¡¡ood test
31 17:40 6031 Oa ps 97 20 2500 2491 lost seal
32 17:50 6032 Oa ps 97 20 2493 lost seal
. 33 18:00 6060 Oa ps 98 20 8.2 2505 2110 2494 ¡¡ood test
34 18:20 6117 Oba ps 98 20 2509 lost seal
35 18:40 6118 Oba ps 98 20 2511 2507 lost seal could not hold set persure
36 19:00 6214 Obb ps 99 20 2535 2524 lost seal
37 19:22 6215 Obb ps 99 20 2527 2523 lost seal
38 19:37 6235 OBb ps 100 20 30.9 2539 2062 2524 ¡¡ood test
39 19:55 6247 OBb ps 100 20 8.8 2542 2067 2525 ¡¡ood test
40 21:00 6402 Obc ps 100 20 2565 2554 dry test
41 21:00 6403 Obc ps 100 20 2556 2549 lost seal
42 21:27 6424 Obc ps 101 20 2567 2551 lost seal
43 21:40 6525 Obc ps 101 20 2556 2550 lost seal
45 2145 6491 Obc ps 102 20 2565 2559 lost seal
46 21:56 6492 Obc ps 102 20 2565 2556 dry test
47 22:05 6496 Obc ps 102 20 2569 2555 dry test
48 22:12 6497 Obc ps 102 20 2563 2556 lost seal
49 22;24 6498 Obc ps 102 20 2563 2555 dry test
50 23:21 6824 Obd ps 103 20 2600 2581 lost seal
51 23:32 6825 Obd ps 103 20 2593 2582 lost seal
52 23:47 6820 Obd ps 103 20 245 2577 2083 2577 good test
54 ..:30 6824 Obd pa 102 .. 2582 2579 54990 63 MRSC-243
PUrTlPÚplo 4000 psi 111al. Oil $ample
56 3:46 6117 66690 I 70 MRSC-292
pump uP to. 4000 psi .·1 ¡¡at oil sample
,I· 86 .··..MPSW1391··:
",,~,,:: , ': " '; "',,., ".,' v: ' ',;,
. pomp Up to 4000 psl~' 450 00 ¡¡assarnple
59 8:13 6496 000 pa 99 2555 2559 70010 120 15795 60 could nofflow
60 9:54 6491 Obc pa 101 2568 2558 700 to 50 30 could not flow
61 11:20 6424 000 pa 101 2581 2556 700 to 50 27 couldnol flow
62 ..i, ·...·..60 MPSRI398
puinp op to 4000 psi .... 450 ccoilsilmple
65 '/. /..1,.·...·.60 MPRS~1399.
pump up 104000 psi 450ceoll Sample
66 $1>895 I 90 450 cêollsamplE!
pump up-tó 4()()() psi MPSR·1400
90675 '. j 80 MP$R,1401
pump ÚP to 4000 psi 450 cê oil Sample
Mbl pa 2341 2179 2343 1900 I 75 MPSR-1402
pump.Up to 4000 psi 450.00 oil and water s.
S-213A MDT Fluid Properties
Sample ID Cylinder # Depth Sand GOR Molar Mass Density API
(ft) sef/stb (glee)
1.01 CSB 7759-QA 6,824 OBd 310 268.3 0.91 24.1
1.02 CSB 7763-QA 6,824 OBd 307 269.1 0.91 24
1.04 CSB 7476-MA 6,177 OBa 234 332.5 0.941 18.8
1.05 CSB 7735-QA 6,177 OBa 225 333.2 0.942 18.8
gas and water/filtrate
. 1.07 CSB 7753-QA 6,000 OA-Upper 15,670 175 0.836 37.7 only - no oil
1.08 CSB 7755-QA 6,403 OBe 291 263 0.907 24.5
1.09 CSB 7690-QA 6,247 OBb 260 282.7 0.917 22.8
1.10 CSB 7761-QA 6,059 OA-Lower 212 308.9 0.936 19.7
1.11 CSB 7725-QA 5,747 Me 194 457.9 0.972 14
1.12 CSB 7680-QA 5,531 Mb1 203 480.4 0.98 12.9
.
Legal Name: 8-213
Common Name: 8-213
1/3/2001
11125/2004
12/812004
FIT
LOT
FIT
2,858.0 (ft)
2,856.0 (ft)
6,870.0 (ft)
2,838.0 (ft)
2,828.0 (ft)
5,265.0 (ft)
10.50 (ppg)
9.20 (ppg)
9.00 (ppg)
.
.
300 (psi)
820 (psi)
411 (psi)
1,848 (psi)
2,172 (psi)
2,873 (psi)
12.53 (ppg)
14.78 (ppg)
10.50 (ppg)
Printed: 2/7/2005 9:37:38 AM
S-213A MDT
Client BP Exploration Inc Tool palps/lf/sclpo/sclpo/sclsclms/pc
Well S-213A Spec D,weather
Date 11/29/04 SO
Rle Time Depth Zone Tool TVD Temp Pretest Mob Before Formation After Flow presure Pump V pump time Test Type/comment
5 12:14 5176 ps 90 20 2296 2158 2295 tool check
7 correlation 15
8 correlation
19 14:30 5531 Mb1 ps 94 20 2.4 2340 2293 2339 çood test
21 15:00 5630 Mb2 ps 94 20 2387 lost seal could not hold set persure
22 15:20 5631 Mb2 ps 94 20 2383 lost seal could not hold set persure
24 15:30 5728 Mc ps 95 20 4.1 2425 2198 2411 çood test
25 1600 5744 Mc ps 95 20 2425 lost seal could not hold set persure
26 16:15 5745 Mc ps 96 20 2418 2414 lost seal
27 16:29 5747 Mc ps 96 20 108.2 2427 2200 2416 çood test
28 16:50 5748 Nb ps 96 20 2449 los seal
29 17:03 5849 Nb ps 96 20 17.1 2446 2114 2443 good test
30 17:30 6000 Oa ps 97 20 38.9 2492 2081 2483 good test
31 17:40 6031 Oa ps 97 20 2500 2491 lost seal
32 17:50 6032 Oa ps 97 20 2493 lost seal
33 18:00 6060 Oa ps 98 20 8.2 2505 2110 2494 çood test .
34 18:20 6117 Oba ps 98 20 2509 lost seal
35 18:40 6118 Oba ps 98 20 2511 2507 lost seal could not hold set persure
36 19:00 6214 Obb ps 99 20 2535 2524 lost seal
37 19:22 6215 Obb ps 99 20 2527 2523 lost seal
38 19:37 6235 OBb ps 100 20 30.9 2539 2062 2524 çood test
39 19:55 6247 OBb ps 100 20 8.8 2542 2067 2525 good test
40 21:00 6402 Obc ps 100 20 2565 2554 dry test
41 21:00 6403 Obc ps 100 20 2556 2549 lost seal
42 21:27 6424 Obc ps 101 20 2567 2551 lost seal
43 21:40 6525 Obc ps 101 20 2556 2550 lost seal
45 2145 6491 Obc ps 102 20 2565 2559 lost seal
46 21:56 6492 Obc ps 102 20 2565 2556 dry test
47 22:05 6496 Obc ps 102 20 2569 2555 dry test
48 22:12 6497 Obc ps 102 20 2563 2556 lost seal
49 22:24 6498 Obc ps 102 20 2563 2555 dry test
50 23:21 6824 Obd ps 103 20 2600 2581 lost seal
51 23:32 6825 Obd ps 103 20 2593 2582 lost seal
52 23:47 6820 Obd ps 103 20 245 2577 2083 2577 good test
54 :30 6824 Obd pa 102 2582 2579 2068 54990 63 MRSÇ-243
P\.mP lIP to 4000 psi 1 gal. Oil SampQ
'é6690 ¡ 10
j)UIIIP III> to 4000 psi
99 2479 lots of Gas I 86 MP8R-I397
P\.mP ÌIP to 4000 psi . 450 cc gas samøte
59 8:13 6496 Obc pa 99 2555 2559 100 to 120 15795 60 . could not Bow .
60 9:54 6491 Obc pa 101 2568 2558 100 to 50 30 cot.dd not flow
61 11:20 6424 Obc pa 101 2581 2558 100 to 50 21 could not ftow
62 6403. pa 101. 1500 to 1900. 60
P\.mP lIP to 4000 psi
I MPRS-1399
PImP ùø 10 4000 psi 450 cc 011 samøte
50895 90
)ump lIP to 4000 psi .'
18:23 9OJ15 ¡ 60
P\.mP up to 4000 psi
68 20:22 .2343 15 MPSR·I402
)ump up to 4000 ø$i . 450 cc 011 and water s.
S-213A MDT Fluid Properties
Sample ID Cylinder # Depth Sand GOR Molar Mass Density API
(ft) sef/stb (g/ee)
1.01 CSB 7759-QA 6,824 OBd 310 268.3 0.91 24.1
1.02 CSB 7763-QA 6,824 OBd 307 269.1 0.91 24
1.04 CSB 7476-MA 6,177 OBa 234 332.5 0.941 18.8
1.05 CSB 7735-QA 6,177 OBa 225 333.2 0.942 18.8
gas and water/filtrate
1.07 CSB 7753-QA 6,000 OA-Upper 15,670 175 0.836 37.7 only - no oil .
1.08 CSB 7755-QA 6,403 OBe 291 263 0.907 24.5
1.09 CSB 7690-QA 6,247 OBb 260 282.7 0.917 22.8
1.10 CSB 7761-QA 6,059 OA-Lower 212 308.9 0.936 19.7
1.11 CSB 7725-QA 5,747 Me 194 457.9 0.972 14
1.12 CSB 7680-QA 5,531 Mb1 203 480.4 0.98 12.9
.
,848 (psi) 2.53 (ppg)
2,172 (psi) 4.78 (ppg)
2,873 (psi) 0.50 (ppg)
.
.
Printed: 2/7/2005 9:37:38 AM
300 (psi
820 (psi
411 (psi
0.50 (ppg)
9.20 (ppg)
9.00 (ppg)
2,838.0 (ft
2,828.0 (ft)
5,265.0 (ft)
2,858.0 (ft
2,856.0 (fl
6,870.0 (ft)
Legal Name 5-213
Common Name: 5-213
1/3/2001 FIT
11125/2004 LOT
2/8/2004 FIT
.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
07:30 - 15:00 I 7.50 MOB P
I
I
115:00 - 00:00 9.00 MOB P
11/18/2004 00:00 - 00:00 24.00 MOB P
11/19/2004 00:00 - 04:30 4.50 MOB P
04:30 - 12:00 7.50 MOB P
I I
112:00 - 13:00 . 1.00 WHSUR P
13:00 - 15:30 2.50 KILL P
15:30 - 16:30 1.00 WHSUR I P
16:30 - 17:00 0.50 WHSUR P
17:00 - 20:00 3.00 KILL P
Move rig off from J-02b.
Pre-move safety meeting with Tool Service, Security and all rig
personnel reviewing pre-move route inspection and all rig move
hazards.
Move rig from J-Pad to S-Pad.
Security stopped rig move for 2 hrs to clear the road allowing
personnel to respond to Z-Pad.
. PRE Work on cellar door and flowline mods
PRE Continue rig mods, cellar doors and flow line. Install vacuum
system lines and controls.
PRE RD flowline platform and scud launcher.
PRE Spot rig over S-213. Spot and RU pit, pump and generator
modules.
20:00 - 21 :00 I 1.00 KILL P
I
21 :00 - 00:00 . 3.00 WHSUR P
11/20/2004 00:00 - 01 :00 1.00 WHSUR P
01 :00 - 08:00 7.00 BOPSUP P
08:00 - 08:30 0.50 BOPSUP P
08:30 - 09:00 0.50 BOPSUF P
09:00 - 12:00 3.00 BOPSUP P
12:00 - 12:30 0.50 BOPSUF P
12:30 - 13:30 1.00 WHSUR P
13:30 - 14:30 1.00 PULL P
14:30 - 15:00 0.50 PULL P
15:00 - 16:30 1.50 PULL P
16:30 - 17:00 0.50 PULL P
RIG ACCEPTED @ 12:00 HRS
DECOMP I RU to tree to circulate.
DECOMP Take on seawater. RU scaffolding in cellar. Berm rig.
DECOMP PJSM. RU DSM and pull BPV through lubricator. RD DSM.
DECOMP Hold pre-spud meeting with crew and all service personnel.
Review well hazards and SOR.
DECOMP RU lines and pressure test to 2900 psi. Reverse circulate 20
bbls through choke using cellar manifold to remove freeze
protect diesel from the tbg. Started taking mixed diesel and
crude oil returns to cuttings box. Switched manifold and
circulated a 40 bbl detergent sweep surface to surface holding
100-150 psi choke pressure to circulate diesel out of annulus.
Circulate a second 40 bbl detergent sweep around to clean up
tbg and csg.
DECOMP Shut in choke and kill lines, monitoring pressure. RD and blow
down lines. 0 pressure, open choke and flow check well for 15
minutes.
DECOMP PJSM. ND tree and adapter flange. Break out tree and set
behind well.
DECOMP Break out adapter flange and set out of cellar behind well.
Enclose rig cellar with tarps.
DECOMP NU BOPE. Install HCR valves. Hook up choke & kill lines to
HCR valves. NU riser & flow line. RU floor drain lines to flowline
manifold.
DECOMP PJSM with all rig personnel on testing BOPE.
DECOMP RU BOP test equipment
DECOMP Test BOPE to 250 13500 psi. Unable to test lower pipe rams
with tbg hanger in the hole. Witness of test waived by John
Crisp with AOGCC.
DECOMP RD BOP test equipment. Blow down lines.
DECOMP PJSM. RU DSM and pull TWC through lubricator. RD DSM
DECOMP RU tbg equipment to pull 3-1/2" completion.
DECOMP MU DP with XO to 4-1/2" NSCT tbg hanger. BOLDS. PU 78k
and unseat tbg hanger. Up weight wI tbg 77k. Pull hanger to
floor.
DECOMP Break out and LD tbg hanger. MU to tbg and circulate 40 bbl
detergent sweep around while reciprocating tbg
DECOMP PJSM with rig crew on pulling and laying down tbg,
Printed: 2/7/2005 9:37:45 AM
·
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11120/2004 ,17:00 - 23:30 I 6.50 PULL P DECOMP Pull and LD 3-1/2" completion. Losses averaging 6-7 bph while
pulling tbg.
, Recovered:
1- jt 4-1/2" tbg
161 - jts 3-1/2" tbg
,3 - GLM's
! 1 - "X" Nipple
11 - 18.71' cut joint of 3-1/2" tbg
23:30 - 00:00 0.50 BOPSUP P DECOMP Monitor well. RU test equipment. Set test plug and fill stack.
11/21/2004 00:00 - 01 :00 1.00 BOPSUF P DECOMP Test lower pipe rams 250/3500 psi. RD test equipment.
01 :00 - 02:00 1.00 PULL P DECOMP Clear tbg handling equipment from rig floor. Clean rig.
02:00 - 03:00 1.00 CLEAN P DECOMP Install wear bushing. PU BHA #1, 6-1/8" clean-out assembly.
03:00 - 08:30 5.50 CLEAN P DECOMP RIH to 5241' with clean out assy picking up 4" DP from pipe
shed. Fill DP and break circulation every 25 stands.
08:30 - 09:00 0.50 CLEAN P DECOMP Wash down from 5241' to tbg stub at 5265'.
5 bpm @ 550 psi
109:00 - 10:00 1.00 CLEAN P DECOMP Circulate 20 bbl detergent sweep followed 40 bbl h-vis sweep.
I Continue circulating to get sweeps out of the hole and clean
returns. Losses averaging 6 bph.
5 bpm @ 550 psi
10:00 - 13:00 3.00 CLEAN P DECOMP Monitor well - level dropping. POH with clean-out assy
I P /U 107k Ibs SIO 1 05k Ibs
113:00 - 13:30 0.50 CLEAN P DECOMP LD 6-1/8" clean out BHA.
13:30 - 14:00 0.50 CLEAN P DECOMP Service rig, drawworks, crown, blocks and iron roughneck
14:00 - 15:00 1.00 DHB P DECOMP MU HES 7" EZSV bridge plug assembly.
15:00 - 17:30 2.50 DHB P DECOMP RIH to 5220'
17:30 - 18:00 0.50 DHB P DECOMP Break circulation. POH to 5200 and set EZSV.
18:00 - 18:30 0.50 DHB P DECOMP Pressure test EZSV to 1000 psi.
18:30 - 20:30 2.00 PXA N CEMT DECOMP Circulate while waiting for cement to be re-batched and sent to
location. Testing of original cement showed a two hour set
time, was sent back to the plant to be re-blended with a
minimum 3 hr set time.
·20:30 - 21 :00 0.50 PXA P DECOMP PJSM with Schlumberger, MI, Veco and all rig personnel on
mixing and pumping cement.
21 :00 - 21 :15 0.25 PXA P DECOMP Pump 5 bbls water to fill lines. pressure test cement lines to
3500 psi.
21 :15 - 21 :30 0.25 PXA jP DECOMP Batch mix and pump 11 bbls (66 sxs) 15.7 ppg, Arctic Set I
I cement. Chase with 10 bbls of water behind cement to flush
lines.
·21 :30 - 22:00 0.50 PXA P DECOMP Switch to rig pump and displace cement with 49 bbls seawater.
22:00 - 22:30 0.50 PXA P DECOMP POH with 5 stands to 4700'
22:30 - 23:15 0.75 PXA P DECOMP Circulate clean seawater around to ensure DP is free of
cement.
5 bpm @ 300 psi
23:15 - 00:00 0.75 PXA P DECOMP Displace well to 9.5 ppg used LSND mud.
5 bpm @ 490 psi
11/22/2004 00:00 - 02:00 2.00 PXA P DECOMP Pump dry job, blow down top drive. POH with setting tool
Printed: 2n/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
11122/2004 02:00 - 04:00 2.00 PXA P DECOMP MU EZSV #2 and RIH to 3155'
04:00 - 04:30 0.50 PXA P DECOMP I PU to 3150' and set EZSV.
P/U 84k Ibs SIO 80k Ibs
04:30 - 06:00 1.50 PXA P DECOMP Blow down top drive and POH with setting tool.
06:00 - 07:00 1.00 STCTPL P DECOMP Pull wear bushing and rig up double valve on 9-5/8" X 7"
annulus.
07:00 - 09:00 2.00 STCTPL P DECOMP MU BOT csg cutter assembly and RIH to 2950'
09:00 - 10:00 1.00 STCTPL P DECOMP Position cutters @ 2950'. Cut 7" csg.
10:00-11:00 1.00 STCTPL P DECOMP Establish circulation through 9-5/8" X 7" annulus. Circulate -50
bbls dead crude out of well.
11 :00 - 13:30 2.50 STCTPL P DECOMP Displace annulus to hot seawater followed by 100 bbl detergent
sweep. Then displace annulus to 9.4 ppg LSND mud
13:30 - 14:00 I , 4 bpm @ 950 psi
0.50 I STCTPL P
DECOMP Pull 1 stand, MU spear assembly and spear 7" csg. BOLDS
14:00 - 15:00 i 1.00 STCTPL P DECOMP Pull of to 350k Ibs, establish circulation and work casing pulling
up to 375k Ibs. Able to pull csg 3' up hole.
15:00 - 16:30 1.50 STCTPL P DECOMP Attemp to work casing back down. Able to work hanger down to
0.50 i STCTPL P 1.5' above ring.
16:30 - 17:00 DECOMP Release spear. LD spear assy.
17:00 - 19:00 2.00 I STCTPL P DECOMP POH and LD csg cutter assembly.
119:00 - 21 :30 2.50! STCTPL P DECOMP PU spear assy and spear 7" csg. Establish circulation, 4 bpm
I @ 450 psi. Work casing picking up to 375k Ibs. Work csg 5'
uphole. Packing off, no returns. Continue working csg picking
up to 400k Ibs and attempting to regain circulation. NO
progress. Un spear and LD spear assy.
21 :30 - 23:00 1.50 STCTPL P DECOMP PU csg cutter and RIH to 2915'.
23:00 - 00:00 1.00 STCTPL P DECOMP Rig service, inspect top drive.
11/23/2004 00:00 - 00:30 0.50 STCTPL P , DECOMP Pump cutter knives open, RIH and tag csg collar at 2913'. PU
l' to 2912' and cut csg. Cut at 2912',53' below 9-5/8" csg
shoe.
00:30 - 02:00 1 .50 PXA P DECOMP Pump dry job, blow down top drive. POH with csg cutter assy.
02:00 - 02:30 0.50 STCTPL' P DECOMP PU csg spear and change out grapple. RIH and spear 7" csg.
02:30 - 03:00 0.50 STCTPL P DECOMP PU to 375k, attempt to establish circulation, packed off.
Continue working csg, attempting to circulate. Csg finally came
free at 395k Ibs. Establish circulation, 3 bpm @ 300 psi.
03:00 - 03:30 0.50 STCTPL P DECOMP CBU 4 bpm @ 300 psi.
03:30 - 04:00 0.50 STCTPL P DECOMP Pull csg hanger to the rig floor. Rig up csg equipment while
circulating, 4 bpm @ 300 psi.
04:00 - 04:30 0.50 STCTPL P DECOMP break out and LD csg spear. Blow down top drive. CO
elevators.
04:30 - 05:00 0.50 STCTPL P DECOMP PJSM with all rig personnel on breaking out and laying down
csg.
05:00 - 10:30 5.50 STCTPL' P DECOMP Pull and UD 69 jts of 7" csg, 29' of cut off jt, casing pup below
hanger
10:30 - 11 :30 1.00 STCTPL P DECOMP UD casing equipment, P/U spear, make service breaks, UD
spear
11 :30 - 13:00 1.50 CLEAN P DECOMP Clear and clean floor.
13:00 - 14:00 1.00 CLEAN P DECOMP Service rig and topdrive, lubricate and inspect crown.
14:00 - 15:30 1.50 CLEAN P DECOMP Change out saver sub on topdrive.
15:30 - 17:00 1.50 WHSUR P DECOMP Install double valve, flange and gauge on OA annulus.
17:00 - 20:00 3.00 REMCM-P DECOMP P/U 30 jts of 3.5" tubing, RIH with 4" DP, tag EZSV at 3,150',
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
pull up to 3,143' UD joint of DP.
M/U TIW valve and cement hose, CBU 5 bpm @ 300 psi, up wt
= 75k, dn wt = 75k, held PJSM with all rig personnel
andcementers, while circulating,
20:30 - 21 :00 0.50 REMCM-P DECOMP Pump 5 bbls water and test lines to 2,500 psi, pump remaining
13 bbls at 5 bpm @ 360 psi, pump 65 bbls 17 ppg class G
¡ cement, 5 bpm 320 psi, pump 2.5 bbls water behind, and
I displace cement with rig pumps at 5 bpm 250 psi, pumped
calculated strokes to balance plug, 15 bbls, 176 strokes. CI P
0.50 I REMCM+P @ 21 :00 hrs.
21 :00 - 21 :30 DECOMP POH slowly to 2,174'
21 :30 - 22:30 1.001 REMCM.P DECOMP M/U topdrive, break circulation @ 1 bpm, increased rate to 6.5
i I bpm 270 psi circulate hole clean, no cement to surface.
22:30 - 23:30 1.00 I REMCM-P DECOMP Pump dry job, POH to 955'
23:30 - 00:00 0.50 REMCM-P DECOMP R/U and lay down 3.5" tubing.
11/24/2004 00:00 - 01 :00 1.00 i REMCM-P DECOMP Continue laying down 30 joints 3.5" tubing
01 :00 - 02:00 1.00 i REMCM-P DECOMP Rig down tubing handling equipment, Install wear ring, Clean
i floor
I
02:00 - 05:00 3.00' REMCM-P DECOMP Pickup 3 DCs, 14 joints 4" HW, Jars, and 39 jts 4" DP.
05:00 - 06:00 1.00 REMCMfP , DECOMP POH stand back 13 stands DP 5 stands HW.
06:00 - 06:30 , 0.50 REMCM P DECOMP Make up 8 3/4" milltooth bit, clean floor
106:30 - 07:30 1.00, REMCM P DECOMP RIH with clean out assembly to 1,990'
07:30 - 09:30 2.00 REMCM-P DECOMP Circulate @ 1,990' 2 bpm, 130 psi, while wait on cement.
109:30 - 12:00 2.50 REMCM-P DECOMP Wash from 1,990' tag top of cement at 2,203', Drill cement
from 2,203' to 2,285', 10-25k wob, 410 gpm, 670 psi, 80 rpm,
torque 3-4k, 40-60 fph.
12:00 - 21 :30 9.50 I REMCM-P DECOMP Continue drilling cement from 2,285' to 2750' 20-28k wob, 415
gpm, 700 psi, 80 rpm, torque 4-5k, 40-60 fph. up wt = 95k, dn
wt = 85k, rt wt = 90k
21 :30 - 22:00 0.50 REMCM-P DECOMP Circulate bottoms up, 415 gpm @ 700 psi.
22:00 - 23:00 1.00 REMCM-P DECOMP POH with clean out assmbly
23:00 - 00:00 1.00 REMCM-P DECOMP Break bit, stand back DCs.
11/25/2004 00:00 - 03:30 3.50 CLEAN P DECOMP Make up 8 3/4" drilling assembly, orient MWD and motor,
PJSM handling sources, load sources and pickup remaining
BHA, surface test MWD at 640', flow rate 460 gpm @ 875 psi.
03:30 - 04:30 1.00 CLEAN P DECOMP RIH with 8 3/4" drilling assembly, position Ghost reamers @ +1-
1,000 and +1- 2,000' per directioal driller, continue RIH to 2694'
04:30 - 05:00 0.50 CLEAN P DECOMP Make up topdrive, break circulation, wash from 2,694' to 2,750'
380 gpm 710 psi.
05:00 - 06:30 1.50 CLEAN P DECOMP Drill cement from 2,750' to 2856' 380 gpm, 780 psi, 50 rpm,
torque 4500 ftIlbs. 80 to 90 fph.
06:30 - 12:00 5.50 STCTPL P DECOMP Time drill off cement plug, from 2,856' to 2,886',3 fph for 3',5
fph for 10', 10 fph for 17' maintaining a 15L toolface, 390 gpm,
1,240 psi on bottom, 1,100 psi off bottom, up wt == 97k, dn wt =
95k
12:00 - 14:30 2.50 STCTPL P DECOMP Continue drilling from 2,886' to 2,932', maintaining 50 psi
differential pressure on motor, holding 15 to 20L toolface,
began rotating from 2,932' to 2,962', 2k wob, 60 rpm, torque
4.5k, 425 gpm, 1,400 psi on bottom, 1,280 psi off bottom.
14:30 - 15:30 1.00 STCTPL P DECOMP Displace well to 9.2 ppg LSND mud, @ 425 gpm, 1,260 psi.
15:30 - 16:30 1.00 DRILL P INT1 Pull back inside casing to 2,758', rig up and perform LOT,
2,856 md, 2,828' tvd, mud wt 9.2 ppg, pressure attained 820
psi, EMW 14.7.
Printed: 2f7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11125/2004 16:30 - 17:00 0.50 DRILL P INT1 RIH to 2,950' obtain clean hole ECD @ 400 & 600 gpm, 60
rpm, clean hole ECD = 9.53.
17:00 - 21 :00 4.00 DRILL P INT1 Directional drill 8 3/4" hole from 2,962' to 3,463', wob 2-5k, 570
,gpm, 1,650 psi on bottom, 1,500 psi off bottom, 60 rpm, torque
15 k on bottom 4.5k off bottom, up wt = 104k, dn wi = 94k, st wt
= 100k, ECD = 9.75. When pumping 600 gpm, losing mud over
shakers, change screens during connection. While making
connection hydraulic hose on topdrive started leaking,
21 :00 - 00:00 3.00 DRILL N RREP INT1 POH to 2,789', blow down topdrive, Repair hose on topdrive.
11/26/2004 00:00 - 03:00 3.00 DRILL N RREP INT1 Repair topdrive, RIH to 3,463'
03:00 - 12:00 9.00 DRILL P INT1 Directional drill 8 3/4" hole from 3,463' to 4,422', wob 2-10k,
570 gpm, 1,830 psi on bottom, 1,730 psi off bottom, 80 rpm,
torque 6-7 k on bottom 4-5k off bottom, up wt = 111 k, dn wt =
100k, st wi = 102k, ECD = 9.95
112:00 - 22:30 AST = .70 ART = 3.08
10.50 DRILL P INT1 ! Directional drill 8 3/4" hole from 4,422' to 5,480', wob 10-20k,
550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm,
torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn wi =
110k, st wi = 120k, ECD = 10.04 calculated clean hole ECD =
122:30 - 23:30 9.54
1.00 DRILL P INT1 Pump 20 bbllow vis sweep, followed by 20 bbl high vis
weighted (10.2 ppg) sweep at 550 gpm 1,990 psi, rotating
string 100 rpm, 4.5k torque, pumped sweep in order to keep
ECD at or below the .60 ppg over clean hole limit through this
section.
23:30 - 00:00 0.50 DRILL P INT1 Directional drill 8 3/4" hole from 5,480' to 5,495', wob 10-20k,
550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm,
torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn WI =
110k, st wi = 120k, ECD = 9.92 calculated clean hole ECD =
9.48
ART = 3.55 AST = .90
11/27/2004 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8 3/4" hole from 5,495' to 6,125", wob 2-1 Ok,
550 gpm, 2,100 psi on bottom, 1,900 psi off bottom, 100 rpm,
torque 6-7 k on bottom 5-6k off bottom, up WI = 135k, dn wt =
115k, st wi = 125k, ECD = 9.90 when sliding 10.04 when
rotating. Having to cycle pumps several times to get survey,
clean suction screens and check pulsation dampner pressure
on both pumps during connection, seemed to help. Continue to
backream slowly on connections to keep ECD within set
parameters.
ART = 1.35 AST = 5.72
12:00 - 18:30 6.50 DRILL P INT1 I Directional drill 8 3/4" hole from 6,125' to 6,485', wob 5-15k,
1565 gpm, 2,240 psi on bottom, 2,110 psi off bottom, 100 rpm,
,torque 8-9 k on bottom 7-8k off bottom, up wt = 130k, dn wt =
107k, st wt = 116k, ECD = 10.0. Developed leak on topdrive
gear box oil cooler.
ART = .64 AST = 3.46
18:30 - 19:30 1.00 DRILL N RREP INT1 Blow down topdrive, made up circulating head, circulate @ 50
gpm, 240 psi, while trouble shooting problem. Decision was
made to pull to shoe to make repairs.
I
Printed: 2f7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
19:30 - 22:00 POH from 6,485' to 2,866', pulled 20k over at 5,652' wiped
through one time, no excess drag pulling back through, pulled
to the shoe with no problems. hole took proper fill.
22:00 - 00:00 2.00 DRILL N RREP INT1 Remove oil cooler from topdrive,take to shop for repairs, clean
oil from topdrive and windwalls, clean floor.
11/28/2004 00:00 - 02:00 2.00 DRILL N RREP INT1 Clean rig floor and topdrive, unable to repair oil cooler bypass
cooler, fill gear box with oil took 10 gallons to fill. Test run
02:00 - 03:30 I topdrive and check for leaks.
1.50 DRILL N RREP IINT1 RIH from 2,866' to 6435' no problem filled pipe @ 5,580'
03:30 - 03:45 ' 0.25 DRILL P INT1 Make up Topdrive, break circulation, ream from 6,435' to 6,485'
no fill
03:45 - 09:00 5.25: DRILL P INT1 Directional drill 8 3/4" hole from 6,485' to 6,880', 5-7k wob, 545
gpm, 2,340 psi on bottom, 2,240 psi off bottom, 100 rpm, 8-9k
torque on bottom, 6-7k off bottom, up wt = 135k, dn wt = 100k
st wt = 112k, ECD = 9.92. At bottoms up saw some trip gas
LEL 80 ppm.
ART = 1.55 AST = 1.11
09:00 - 09:30 0.50 DRILL P INT1 Circulate bottoms up @ 545 gpm, 2,400 psi, 100 rpm, 8-9k
torque, reciprocate full stand.
09:30 - 13:00 3.50 DRILL P INT1 MAD pass from 6,880' to 5,872', pumping 550 gpm, 2,400 psi,
113:00 - 13:30 100 rpm, 8k torque, 600 fph.
0.50 DRILL P INT1 RIH fro 5,872' to 6,880' no problem going in hole.
13:30 - 15:00 1.50 DRILL P INT1 Pump 20 bbllow vis sweep, 20 bbl high vis weighted sweep,
575 gpm, @ 2,600 psi, 110 rpm, 9k torque, sweep brought
back a significant amount of cuttings.
15:00 - 19:00 4.00 DRILL P INT1 Monitor well, POH to BHA no hole problems, monitor well at
BHA
19:00 - 22:00 3.00 DRILL P INT1 Rack back HW and jars, RIB DCs, PJSM handling sources,
remove sources, down load MWD, UD bit motor and MWD.
22:00 - 23:30 1.50 DRILL P IINT1 Clear floor of all directional tools, clean floor
23:30 - 00:00 0.50, EVAL P ,INT1 Remove snow from pipe shed ramps, load MDT logging tools
in pipe shed.
11/29/2004 00:00 - 00:30 0.50 EVAL P INT1 Continue loading pipe shed with Schlumberger MDT tools
00:30 - 01 :00 0.50 EVAL P INT1 PJSM with all rig personnel, Co Rep, Toolpusher,
Schlumberger crew, picking up logging tools.
01 :00 - 03:00 2.00 EVAL P INT1 Make up MDT logging tools per Schlumberger representative.
03:00 - 03:30 0.50 EVAL Ip 'INT1 Latch up docking head and test logging tools. Rig up wire line
Ip sheave in derrick, make up xo to logging tools.
03:30 - 10:00 6.50 EVAL INT1 RIH with MDT tools on 4" DP 1 min perl stand fill DP @ 2,859',
fill every 5 stands in open hole, RIH to 5,293'
10:00 - 12:00 I 2.00 EVAL P INT1 Pickup single of 4" DP, make up xo's and side entry sub, RIH
with e-line, pumping @ 20 gpm to latch up head.
Up wt = 105k, dn wt = 90k.
12:00 - 12:30 0.50 EV AL P INT1 ¡Test MDT tool string, and side entry sub packoff.
12:30 - 00:00 11.50 EVAL P INT1 . Logging with Schlumberger, taking pressure samples as
directed by on site Geologist, took a total of 31 samples, 22
attempts failed due to lost seal or dry sample. The 9 samples
that were recorded were from the following depths. Up wt =
140k, Dn wt = 100k.
Mb1 - 5,531'
Mc - 5,728'
Mc - 5,747'
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11129/2004 12:30 - 00:00 11.50 EVAL P INT1 Nb - 5,849
OA - 6,000'
OA - 6,060'
OBb - 6,235'
OBb - 6,247'
OBd - 6,820'
11/30/2004 00:00 - 22:00 22.00 EVAL P INT1 - Run MDT logs taking fluid samples @ depths per on-site
Geologist. Good fluid samples @ 8 of 11 stations.
6824' - good sample in OBd
6117' - good sample in OBa
6000' - good sample in OA
6496' - no good - OBc
6490' - no good - OBc
6424' - no good - OBc
6403' - good sample in OBc
6247' - good sample in OBd
6060' - good sample in OA
5748' - good sample in Me
5532' - good sample in Mb1
- Rig crew trained on vacuum system usage while logging.
- Full derrick inspection completed.
- RA tags inserted in cementralizers on 4 jts of 7 5/8" casing.
22:00 - 22:30 0.50 EVAL P INT1 - POH to 5293'.
22:30 - 00:00 1.50 EVAL P INT1 - RID side entry sub & XO's.
12/1/2004 00:00 - 00:30 0.50 EVAL P INT1 - Break circ - monitor well.
- Pump dry job - BID TD.
·00:30 - 03:00 2.50 EVAL P INT1 - POH to logging tools.
03:00 - 05:30 2.50 EV AL P INT1 - B/O & UD logging tools.
05:30 - 06:00 0.50 EV AL P INT1 - Clear & clean rig floor.
06:00 - 08:00 I 2.00 EV AL P INT1 - M/U clean out BHA consisting of: 8 3/4" FDS+VC mill tooth
bit, NB stab wi float, PWD, MWD, NM XO, NM spiral DC, NM
stab, 2 NM spiral DC's, float I saver sub, jars, XO & 14 jts
HWDP.
- RIH to 830' & shallow test MWD. 450 GPM - 650 psi.
08:00 - 09:00 1.00, EVAL P INT1 - RIH wI BHA on 4" DP to 2821' & fill pipe.
09:00 - 10:00 1.00 EVAL P INT1 - PJSM - slip & cut 85' drilling line.
10:00 - 10:30 0.50 EV AL P INT1 - Service & lubricate rig.
10:30 - 11 :00 0.50 EV AL P INT1 - RIH wI BHA on 4" DP to 3495'.
11 :00 - 11 :30 0.50 EV AL P INT1 - CBU @ 400 GPM, 770 psi, 40 RPM.
- BID TD.
11 :30 - 14:00 2.50 EV AL P INT1 - RIH to TD @ 6880' washing down last 90' & breaking circ @
5000'. PIU wt 145K, S/O wt 95K on bottom
- Washed & worked through tight spots @ 6063',6120',6250'
& 6821'.
14:00 - 16:30 2.50 EV AL P INT1 - Pump & circ around 20 bbllow- vis weighted sweep followed
by 20 bbl hi-vis sweep @ 600 GPM, 2540 psi, 120 RPM. CBU x
3.
- Monitor well - spot lube-tex pill & pump dry job.
16:30 - 19:30 3.00 EVAL P INT1 - POH wI clean out assy to BHA - hole slick.
19:30 - 21 :30 2.00 EVAL P INT1 - UD BHA & clear floor.
- Drain stack.
21 :30 - 22:00 0.50 BOPSUP P INT1 - Pull bowl protector & install test plug.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/1/2004 22:00 - 00:00 2.00 CASE P INT1 - PJSM - CIO upper pipe rams to 7 5/8" .
- Bring 7 5/8" casing tools to rig floor.
12/2/2004 00:00 - 00:30 0.50 CASE P INT1 - Test door seals to 1,000 psi for 5 min.
- RID test equip't.
00:30 - 01 :30 1.00 CASE P INT1 - Make dummy run wI casing hanger on LJ.
I - R/U to run casing.
i
I - Dropped 200T slip segment downhole.
01 :30 - 02:30 1.00 FISH N HMAN INT1 - Discuss options wi Baker, Schlumberger, & Anchorage.
Decision to attempt segment retrieval w/slickline & magnet.
02:30 - 03:30 1.00 FISH N HMAN INT1 - Wait on slickline unit to arrive from DS 15.
2.00 I FISH - UD casing tools, set bowl protector, P/U & install short bails &
elevators.
03:30 - 05:30 IN HMAN INT1 Prepared rig floor for slickline equip't.
I - M/U Baker tools - 8" magnet & 3 XO's to 3/4" sucker rod
conn.
- Spot slickline unit & load tools in pipeshed.
05:30 - 08:00 2.50 FISH N HMAN INT1 - PJSM - R/U slickline unit wI lubricator for pressure control.
08:00 - 14:30 ' 6.50 FISH N HMAN INT1 - RIH wI magnet - tagged up @ 2831' WLM & slowly POH - No
I fish.
I - RIH to 2851' & tagged up - Pushed fish to 2854' & set down
@ 2854' x 3. POH - no fish.
- RIH to 2854' & tagged fish. Pushed & worked fish to 3092'.
POH wI indication of fish on magnet until 2811 '. Lost weight.
RIH & tagged up @ 2811 '. Could not work past 2811'. POH -
no fish.
- RIH & tagged up @ 2820'. Slowly worked magnet - fish
moving downhole. Tagged up @ 3120' - POH wI good
indication of fish on magnet. Lost fish @ 2958'. RIH to 3250' &
tag fish. POH wI good indication of fish & lost fish @ 2932'.
RIH & tagged fish @ 3000' & POH to 2932' losing fish @ 2932'
x 5. POH wI Slickline, No Recovery.
14:30 - 15:30 1.00 FISH N HMAN INT1 - CIO slickline assy to LIB. RIH & pushed fish to 3330' in
attempt to obtain impression of fish. POH & UD LIB wI slight
impression of fish, nothing conclusive.
15:30 - 17:30 I 2.00 FISH N HMAN INT1 - M/U grabber tool assy & RIH. Push fish to 3800' & attempt to
latch fish. Hole getting sticky - POH - no fish.
17:30 - 18:30 , 1.00 FISH N HMAN INT1 - PJSM - RID slickline.
18:30 - 20:30 2.00 BOPSUF P IINT1 - PJSM - drain stack, pulled bowl protector & installed test plug.
- C/O top pipe rams from 75/8" to 3 1/2" x 6" variables.
20:30 - 21 :00 0.50 BOPSUP P INT1 - PJSM - R/U test equip't.
21 :00 - 00:00 3.00 BOPSUF P INT1 - Test BOPE per BP & AOGCC regs to 250 I 3500 psi for 5 I 5
min. Witness of test waived by AOGCC Rep Chuck Scheve.
12/3/2004 00:00 - 01 :00 1.00 BOPSUF P INT1 - RID BOPE test equip't, BID choke & kill lines, pulled test plug
& installed bowl protector.
01 :00 - 04:00 3.00 FISH N HMAN INT1 - P/U & M/U BHA # 10 for pushing junk to bottom consisting of:
85/8"
"metal muncher" bladed mill, boot basket, bit sub, oil jars, XO,
3 61/4" DC's, 2 XO's & 12 jts HWDP.
04:00 - 08:30 4.50 FISH N HMAN INT1 - Thaw out kelly hose.
- B/O kelly hose @ standpipe gooseneck & thaw ice plug wI
,steam hose. P/U & M/U kelly hose.
08:30 - 10:30 2.00 FISH N HMAN liNn 1- RIH wi clean out assy on 4" DP to 2850' & broke circ.
I
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/3/2004 08:30 - 10:30 2.00 FISH N HMAN INT1 - RIH from 2850' to 3600' & broke circ 3 BPM 500 psi. After
I pumping 10 bbls pressure increased to 2000 psi. Bled off &
attempted to pump - pressure increased to 2500 psi. Bled off
I pressure, checked surface system - system clear. Drill string
plugged off.
10:30 - 12:00 1.50 FISH N HMAN INT1 - Attempted to unplug drill string wlo success. POH to 2800' &
I attempted to unplug drill string wlo success.
12:00 - 14:00 2.00 FISH IN HMAN INT1 - POH wet wI 4" DP to BHA.
14:00 -15:00 1.00 FISH N HMAN INT1 - BID BHA & cleaned out plugged mill.
15:00 - 16:001 1.00 FISH N HMAN INT1 - M/U BHA for pushing junk to bottom.
16:00 - 17:30 I 1.50 FISH N HMAN INT1 - RIH wI clean out assy on 4" DP to 3600' filling @ 2850'.
17:30 - 18:00 0.50 FISH N HMAN INT1 - CBU @ 3600'.550 GPM 1300 psi.
18:00 - 21:30 3.50 FISH N HMAN INT1 - RIH from 3600' @ 1.5 min per stand & tag fish wi 20K @
5687'. Stack 20K x 3, & 30K x 2 in attempt to move fish. P/U
15' & break circ.
- Stack 20K x 2 on fish wi pumps on - 650 GPM, 2220 psi - no
movement.
- Circulate on top of fish wi no wt on mill for 30 min - 700 GPM,
2630 psi
- P/U & rotate 10, 20, & 60 RPM wi different wts. on mill from 1
to 15K.
On junk Tq 2 to 3K higher than off bottom Tq. P/U wt 135K,
S/O wt 105K, Rot wt 117K.
- WOM 10K, 10 RPM, pump rate 700 GPM, 2630 psi, Tq 5K.
I Mill torqued up, fish fell down hole. Worked stand x 2 wI no
drag.
21 :30 - 22:30 I N HMAN INT1 - RIH from 5687' to 6632'.
1.00 I FISH
22:30 - 00:00 1.50 FISH N HMAN INT1 - Tag fish @ 6632' w/20K. P/U & stack 50K on fish x 5 - no
movement.
- Circulate on top of fish wi no wt - 700 GPM 2850 psi for 15
I min.
I - Mill on fish w/5K WOM, 10 RPM, off bottom Tq 4K, on
bottom Tq 7 to 9K, 700 GPM 2850 psi.
IHMAN - Push fish from 6632' to 6640'.
12/4/2004 00:00 - 01 :00 1.00 FISH N INT1 - Milled & washed on fish from 6640' to 6880'. WOM 10K, 10
IHMAN RPM, TQ 7-9K, pump pressure 2160 psi @ 600 GPM.
01 :00 - 03;00 2.00, FISH N INT1 - At TD stack 50K to 60K wt on fish x 5.600 GPM 2150 psi
I - Mill new hole from 6880' to 6885'. WOM 5K to 14K, 100 RPM,
,
I Tq 7 - 8K, 600 GPM 2180 psi.
I I
I ¡HMAN - Work string from 6885' to 6865' x 10.
03:00 - 05;00 2.00 FISH N INT1 - Pumped 20 bbllow-vis weighted sweep followed by 20 bbl
I hi-vis sweep & CBU x 3.600 GPM 2150 psi 120 RPM.
I - Monitored well.
I
05:00 - 06:00 1.00 FISH N IHMAN INT1 - Pump lube pill - pump dry job - BID equip't.
06:00 - 06:30 0.50 FISH N ¡HMAN INT1 - POH from 6885' to 6632'.
- Pulled tight wi 40K overpull.
06:30 - 13:30 7.00 FISH N HMAN INT1 - Attempted to RIH from 6632' wlo success. Stacked 50K on
mill & engaged pumps, 610 GPM 2050 psi. Could not rotate
pipe. Continued to work pipe & obtained rotation wI 20 RPM,
Tq 5 - 20K. Worked string.
- Backreamed out of hole fromm 6632' to 6435' @ 120 RPM,
610 GPM 2000 psi.
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1214/2004 06:30 - 13:30 7.00 FISH N HMAN INT1 - Hung up @ 6434' - pump rate 610 GPM, 2000 psi. Could not
rotate. Worked drill string & jarred up wI 50K overpull x 4.
- Obtained rotation & backreamed out of hole dragging fish
¡ from 6434' to 5477'.
IHMAN - Lost drag @ 5500'. POH from 5479' to 5380' wI no drag.
13:30 - 15:30 2.00 I FISH N INT1 - BID TO.
I I - POH from 5380' to BHA pulling slowly through 9 5/8" shoe wI
no drag.
15:30 - 17:30 2.00 FISH N HMAN INT1 - POH, clean & BIO BHA.
17:30 - 18:30 1.00 FISH N HMAN INT1 - Clear & clean floor. Loaded new BHA tools & brought to rig
floor.
18:30 - 19:00 , 0.50 FISH N HMAN INT1 - Service TD.
,
19:00 - 19:30 ! 0.50 FISH N HMAN INT1 - Loaded additional collars in pipeshed & brought additional
mills to rig floor for current BHA.
19:30 - 21 :30 2.00 FISH N HMAN INT1 - M/U BHA consisting of: 8 1/8" tapered mill, 83/8" string mill,
XO, float sub, NM spiral DC, XO, 8 3/8" string mill, XO, NM
spiral DC, 8 1/2" string mill, oil jars, NM spiral DC, XO, 3 DC's,
21 :30 - 00:00 r 12 XO's & 12 jts 4" HWDP.
2.50 FISH N HMAN INT1 - RIH to 5005'. Filled pipe @ 2800'.
12/5/2004 00:00 - 01 :00 1.001 FISH N HMAN INT1 1- RIH from 5005' to 5775'. Filled pipe @ 5200'.
- No drag while running in hole wi S/O wt 105K. At 5775' picked
up stand to check drag on upstroke & tagged junk wI 25K
overpull @ 5695'.
01 :00 - 02:30 1.50 FISH N HMAN INT1 - Backream stand from 5775' to 5679 x 3 - 60 RPM, 600 GPM,
2280 psi.
I - Increase rotary to 100 RPM & backream stand from 5775' to
5679' x 7. Shut off rotary & pumps & work stand - no drag up or
down.
- Rack back stand & check drag on upstroke from 5679' to
5583'. No drag.
- RI H to 5871' - P/U from 5871' to 5775' to check for drag. No
drag
102:30 - 03:30 ¡ 1.00 FISH N HMAN INT1 - RIH from 5871' to TD @ 6885' wI no problems. Checked for
drag from 6542' to 6446', 6736' to 6639', & from 6885 to 6832'.
03:30 - 05:00 1.50 FISH N HMAN INT1 - Pumped 20 bbllow vis weighted sweep followed by 20 bbl
hi-vis sweep & circulate surface to surface & additional B/U.
05:00 - 06:30 1.50 FISH N HMAN INT1 - Monitor well - POH from 6885' to 5200' wi no drag. Monitor
well - static. Pump dry job & BID TD.
06:30 - 10:00 3.50 FISH N HMAN INT1 - POH wi 4" DP to BHA - no drag.
10:00 - 12:30 2.50 FISH N HMAN INT1 - BIO & UD BHA.
12:30 - 13:00 0.50 FISH N HMAN INT1 - Cleared & cleaned rig floor.
I 13:00 - 13:30 0.50 BOPSUF N HMAN INT1 - PJSM - drained stack, pulled bowl protector & installed test
HMAN IINT1 plug.
13:30 - 15:00 1.50 BOPSUP N CIO upper rams to 7 5/8".
- Tested door seals to 1000 psi.
Pulled test plug.
15:00 - 15:30 0.50 CASE N HMAN INT1 - PJSM for rigging up & running casing.
15:30 - 17:00 1.50 CASE N HMAN INT1 - R/U 7 5/8" casing handling equip't.
17:00 - 20:00 3.00 CASE P INT1 - MIU & run 33 jts. 75/8" 29.7# L-80 STL FJ casing.
- Bakerlok connections on pin end of jts 2 & 3. Broke circulation
& checked floats - floats holding. M/U to 5200 ftllbs Tq and
I utilizing Jet Lube Seal Guard thread compound on
I
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1215/2004 17:00 - 20:00 3.00 CASE P INT1 connections.
20:00 - 21 :00 1.00 CASE N SFAL INT1 1- Dropped casing jts between pit complex & pipeshed. Secure
area & stand down for safety. Discuss & review incident wI all
crew members.
21 :00 - 22:30 1.50 CASE N SFAL INT1 1- Reposition casing in yard to facilitate loading ODS portion of
I pipeshed & load casing.
22:30 - 00:00 1.50 CASE P INT1 - Run 75/8" 29.7# L-80 STL FJ casing to 2112' filling every jt
i via Frank's fill up tool.
12/6/2004 00:00 - 01 :30 1.50 CASE P INT1 - Run 7 5/8" 29.7# L-80 STL FJ casing to 2839' filling every jt
wi Frank's fill up tool.
- M/U to 5200 ftllbs Tq. & utilizing Jet Lube Seal Guard thread
compound on connections.
01 :30 - 02:00 0.50 CASE P INT1 - CBU x 2 @ 9 5/8" casing shoe. 4 - 5 SPM wI no losses.
- 4 BPM 370 psi, 5 BPM 400 psi.
- P/U wt 115K, SIO wt 110K.
02:00 - 10:30 8.50 CASE P INT1 - Continue running 7 5/8" 29.7# STL FJ casing into OH @ 60
I see I jt breaking circulation every 20 jts. Running speed 6 min
'per jt while breaking circulation.
- Wash last jt down @ 5 BPM 640 psi.
- Ran a total of 167 jts, 2 19.9' & 210' pup jts. RA tags @
6703',6346',6062' & 5940'.
10:30 - 11 :00 0.50 CASE P IINT1 - S/O & UD Frank's tool - M/U cement head.
11 :00 - 13:00 2.00 CEMT P ¡INT1 - Staged up pumps - circ & cond mud @ 2 BPM 330 psi, 4
I BPM 530 psi & 5 BPM 590 psi.
· Reciprocated 5' while circulating. Took 350K to obtain pipe
movement - P/U wt 225K, SIO wt 127K after initial movement.
· Held PJSM wi Rig Crew, Cementers, Truck Drivers, Mud Eng,
Tool Pusher & Co. Rep while circulating.
13:00 - 15:00 2.00 CEMT P INT1 - Pumped 5 bbls fresh water & tested lines to 4,000 psi.
Pumped 20 bbls CW 100 @ 4 BPM 600 psi followed by 30 bbls
10.2 ppg Mud Push @ 4.5 BPM 650 psi. Dropped bottom plug
& pumped 49 bbls (229 sx) 15.8 ppg Class G cement.
Dropped top plug and pumped 10 bbls fresh water via
Cementers @ 5 BPM 290 psi.
- Switched over to rig pump & displaced wi 301.8 bbls
Seawater at following rates:
Pumped Rate Pressure
50 bbls 5 bpm 300 psi
100 bbls 5 bpm 400 psi
150 bbls 5 bpm 450 psi
200 bbls 5bpm 475 psi
250 bbls 5 bpm 550 psi
Slowed Rate to 3 bpm wi 292 bbls pumped. Bumped plug wI
1,900 psi & held pressure for 3 min.
· Bled off pressure & checked floats - floats held.
- CIP 1500 hrs.
15:00 - 16:30 1.50 CEMT P INT1 - RID cement equip't & cleared floor.
· CIO bails & elevators.
16:30 - 17:00 0.50 CASE P INT1 · PJSM - Installed 9 5/8" x 7 5/8" packoff & tested to 5,000 psi
for 10 min. Good test.
17:00 - 19:30 2.50 BOPSUF P INT1 - PJSM - Installed test plug & CIO upper rams from 7 5/8" to 3
1/2" x 6" variables.
- R/U test equip't & tested door seals to 1,000 psi - RID test
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/6/2004 17:00 - 19:30 2.50 BOPSUP P INT1 equip't & pulled test plug.
19:30 - 20:00 0.50¡CASE P INT1 - Serviced TD.
20:00 - 21 :00 1.00[ DRILL P PROD1 - Load BHA tools on floor.
- M/U 63/4" BHA - 6 3/4" PDC bit, mud motor dialed in to 1.5
121 :00 - 00:00 deg bend & 6 3/4" stab.
3.00 DRILL N DPRB PROD1 - RIH & tag up @ 27.7' wI PDC bit. POH & inspect bit.
- RIH & tag up @ 27.7' - Apply 5K wt to bit - no go. Apply 5K wt
to bit @ 5 RPM - no go.
- Change setting on motor to 0 deg bend & RIH - no go
- POH & remove bit. RIH wI motor & 6 5/8" sleeve on motor &
able to RIH to 31' wlo tagging up.
12/7/2004 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 Attempt to RIH wi two different PDC bits & tagged up @ 27.7'.
01 :00 - 02:30 1.50 DRILL P PROD1 PJSM - Line up to OA & test line to 3000 psi. Pumped 50 bbls
mud down annulus @ 1 BPM.
SPM Pressure Total stks
12 630 120
12 610 180
12 660 240
13 720 300
13 720 360
13 710 420
13 700 480
13 700 540
13 700 588
02:30 - 03:00 0.50 DRILL N DPRB PROD1 UD drilling BHA.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 MU 6-3/4" string mill with a stabilizer and a 6-1/4" DC.
04:00 - 04:30 0.50 FISH N DPRB PROD1 Mill through obstruction @ 27.7'. Milled for - 6" & cleaned up
area. Ran mill wlo rotatating to 167' to ensure clear below.
04:30 - 05:00 0.50 DRILL N DPRB PROD1 UD milling BHA.
05:00 - 07:30 ¡ 2.50 DRILL P PROD1 I RU test equipment. Close blind rams and test csg to 3500 psi
107:30 - 10:30 I for 30 minutes. Bleed pressure, open rams and RD test
, equipment.
3.00 DRILL ¡p PROD1 PU and MU 6-3/4" directional BHA #14
10:30 - 14:30 4.00 DRILL P PROD1 RIH to 2250' with 6-3/4" directional BHA. Shallow test MWD @
¡685'.
SymOps:
PJSM. RU Little Red to 7-5/8" X 9-5/8" annulus. Test lines to
3000 psi. Inject 45 bbls dead crude to freeze protect.
IPR 2 bpm @ 1500 psi
FPR 2 bpm @ 1500 psi.
Shut in with 950 psi, pressure bled to 250 psi by midnight
14:30 - 16:00 1.50 DRILL P PROD1 Change out saver sub and service top drive.
16:00 - 21 :00 5.00 DRILL P PROD1 Continue RIH from 2250' to 6050' picking up DP from pipe
shed
21 :00 - 22:00 1.00 DRILL P PROD1 Cut and slip 60' of drill line.
22:00 - 22:30 0.50 DRILL P PROD1 Circulate a drill string volume to ensure DP free of obstructions.
22:30 - 23:30 1.00 DRILL P PROD1 RIH from 6050' to 6625'. MU top drive and wash last stand
0.50 I DRILL down down, tagged up on cement stringers @ 6740'
23:30 - 00:00 P PROD1 Wash and ream down from 6740' cleaning up cement stringers.
12/8/2004 00:00 - 01 :30 1.50 I DRILL P PROD1 Continue washing and reaming down to 6781' cleaning up
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1218/2004 00:00 - 01 :30 1.50 DRILL P PROD1 cement stringers to the float collar.
01 :30 - 02:00 0.50 DRILL P PROD1 PJSM with Veco and all rig personnel on displacing to MOBM.
02:00 - 03:00 1.00 DRILL P PROD1 Pump 20 bbl L VT spacer followed by MOBM to displace well to
.9.2 ppg MOBM, 215 gpm @ 1000 psi
03:00 - 05:00 2.00 DRILL P PROD1 Circulate surface to surface X 2 to shear and warm MOBM. 330
gpm @ 2500 psi.
05:00 - 08:00 3.00 DRILL P PROD1 Drill shoe track cement from 6781' to 6870'. Clean out 8-3/4"
rathole from 6870' to 6885' and drill 23' of new hole to 6908'
,WOB = 5 klbs
RPM Surf= 50, DH = 225
GPM = 285 @ 2100 psi on Btm
Torque = 3k FtLbs
08:00 - 09:30 1.50 DRILL P PROD1 ,PJSM. Break off stand and pull bit inside 7-5/8" csg. Perform
i 10.5 ppg EMW FIT, 411 psi surf pressure at 5265' TVD with
9.0 ppg mud in the hole.
Baseline ECD = 9.89 ppg
,09:30 - 14:00 4.50 DRILL P I PROD1 . Directional drill from 6908' to 7197', sliding as required to
I maintain inclination and azimuth.
I
1 WOB = 3-5 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2900 psi on Btm, 2570 psi off Btm
P/U 125k S/O 97k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke.
Calculated ECD = 10.09 ppg
Actual ECD = 10.45 ppg
14:00 - 15:00 1.00 DRILL P PROD1 POH to 7033' and RIH picking up 30' surveys to 7197
15:00 - 00:00 9.00 DRILL P PROD1 Directional drill from 7197' to 7869', sliding as required to
maintain inclination and azimuth.
WOB = 3-5 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3100 psi on Btm, 2800 psi off Btm
P/U 125k S/O 90k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'
Calculated ECD = 10.10 ppg
Actual ECD = 10.47 ppg
ART last 24 hrs. =2.23 hrs.
AST last 24 hrs. = 4.33 hrs.
Total drilling hours = 6.56 hrs
12/9/2004 00:00 - 00:00 24.00 DRILL P PROD1 Directional drill from 7869' to 9851', sliding as required to
maintain inclination within constraints provided by rig site
geologist to maximize reservoir contact.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/1 9/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1219/2004
. 00:00 - 00:00
24.00 DRILL P
PROD1 WOB = 4-7 klbs
RPM Surf= SO, DH = 260
GPM = 330 @ 3320 psi on Btm, 3120 psi off Btm
I¡TOrqUe = 7k FtLbs on Btm, 6k FtLbs of Btm
P/U 13Sk SIO SSk ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'. Circulate lo-vis and weighted
sweeps as required to ensure clean hole conditions.
Calculated ECD = 10.23 ppg
Actual ECD = 10.47 ppg
12/10/2004 00:00 - 00:00
24.00 DRILL P
ART last 24 hrs. = 5.92 hrs.
AST last 24 hrs. = 2.93 hrs.
Total drilling hours = S.S5 hrs
PROD1 Directional drill from 9S51' to 1170S', sliding as required to
maintain inclination within constraints provided by rig site
geologist to maximize reservoir contact.
WOB = 4-11 klbs
RPM Surf= SO, DH = 260
'GPM = 330 @ 3550 psi on Btm, 3200 psi off Btm
Torque = 7-Sk FtLbs on Btm, 6-7k FtLbs of Btm
P/U 132k SIO 75k ROT 107k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'. Circulate sweeps as required to
ensure clean hole conditions.
Calculated ECD = 1 0.S2 ppg
Actual ECD = 11.02 ppg
12/11/2004 00:00 - 05:00
5.00 DRILL P
ART last 24 hrs. = 3.93 hrs.
AST last 24 hrs. = 4.50 hrs.
Total drilling hours = S.43 hrs
PROD1 Directional drill from 1170S', to TD of lateral #1 at 12190' sliding
as required to maintain inclination within constraints provided
by rig site geologist to maximize reservoir contact.
WOB = 3-6 klbs
RPM Surf= SO, DH = 260
GPM = 330 @ 3730 psi on Btm, 3240 psi off Btm
Torque = Sk FtLbs on Btm, 7.5k FtLbs of Btm
P/U 144k SIO 70k ROT 109k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30',
Calculated ECD = 10.91 ppg
Actual ECD = 11.30 ppg
ART last 24 hrs. = 1.10 hrs.
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12111/2004 00:00 - 05:00 5.00 DRILL P PROD1 AST last 24 hrs. = 0.90 hrs.
Total drilling hours = 2.00 hrs
05:00 - 07:30 2.50 DRILL P PROD1 ,CBU X 2, to circulate and condition hole.
I
I RPM = 80
330 gpm @ 3200 psi.
IntiaJ ECD = 11.25 ppg
Final ECD = 11.10 ppg
Calculated ECD = 10.91 ppg
07:30 - 09:30 2.00 DRILL P PROD1 POH for wiper trip to csg shoe from 12190' to 11703', 35 klbs
drag and swabbing
09:30 - 17:00 7.50 DRILL P PROD1 MU top drive and back ream out from 11703' to 6813'.
RPM = 80
GPM = 330 @ 3000 psi
'p Torque = 8-10k FtLbs
17:00 - 18:00 1.00 DRILL PROD1 CBU X 2 at the 7-5/8" csg shoe.
18:00 - 19:00 1.00 DRILL P PROD1 Service top drive, blocks, crown, drawworks and iron
roughneck.
19:00 - 22:00 3.00 DRILL P PROD1 RIH to 12096' filling DP every 20 stands. Work through tight
spots from 11710' to 12096'
22:00 - 23:00 1.00 DRILL P PROD1 MU top drive and wash last stand to bottom at 12190'
23:00 - 00:00 1.00 DRILL P PROD1 Pump a 20 bbllo-vis sweep followed by a 20 bbl weighted
sweep.
RPM = 80
330 gpm @ 3300 psi.
12/12/2004 00:00 - 02:00 2.00 DRILL P PROD1 Continue circulating BU X 3 to clean and condition hole.
RPM = 80
330 gpm @ 3780 psi.
Intial ECD = 11.45 ppg
Final ECD = 11.19 ppg
Calculated ECD = 11.17 ppg
SymOps:
PJSM. Transfer MOBM from pit module to 400 bbl upright
tanks.
02:00 - 02:30 0.50' DRILL P PROD1 PJSM with MI, Veco and all rig personnel on displacing well to
SFMOBM.
02:30 - 04:00 1.50 DRILL P PROD1 Displace well to Solids Free MOBM.
rate 285 gpm @ 2970 psi
04:00 - 10:30 6.50 DRILL P PROD1 Monitor well - static. POH from 12190' to 6520' to run 4-1/2"
liner. Worked through 7-5/8" csg shoe at 6870'. Recorded PI U
and S I 0 Weights every 1,000'. Circulated bottoms up at csg
shoe, 330 gpm 2,500 psi, RPM 60.
10:30 - 13:30 3.00 DRILL P PROD1 MAD pass from 6520' to 5900' to verify placement of RA tags
in 7-5/8" csg.
13:30 - 17:00 3.50 DRILL P PROD1 Continue POH from 5951 to 208'. Recorded PI U and S I 0
Weights every 1,000'.
17:00 - 17:30 0.50 DRILL P PROD1 PJSM with Anadrill and all rig personnel on pulling RA sources
and laying down the BHA.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12112/2004 17:30 - 20:00 2.50 DRILL P PROD1
20:00 - 21 :00 1.00 DRILL P PROD1
21 :00 - 21 :30 0.50 CASE P PROD1
21 :30 - 22:00 0.50 CASE P PROD1
22:00 - 00:00 2.00 CASE P PROD1
12/13/2004 00:00 - 05:00 5.00 CASE P PROD1
05:00 - 06:00 1.00 CASE PROD1
06:00 - 07:30 1.50 CASE P PROD1
07:30 - 08:00 0.50 CASE P PROD1
'08:00 - 12:00 4.00 CASE P PROD1
12:00 - 13:30 1.50 CASE P PROD1
13:30 - 16:30
16:30 -17:00 '
117:00 - 17:30 I
Ii 17:30 - 18:30
18:30 - 22:00
¡ 22:00 - 00:00
12/14/2004 00:00 - 05:30
05:30 - 06:30
3.00 CASE P
0.50 CASE P
0.50 CASE P
1.00 CASE P
3.50 STWHIP P
2.00 STWHIP P
5.50 STWHIPI P
1.00 STWHIP¡ P
PROD1
PROD1
PROD1
PROD1
WEXIT
WEXIT
WEXIT
WEXIT
06:30 - 09:00
2.50 STWHIP P
WEXIT
09:00 - 15:00
6.00 STWHIP P
WEXIT
LD BHA #14, Clear floor and remove RA sources.
Clean and clear rig floor.
Rig up to run 4-1/2" liner
PJSM with Baker and all rig personnel on picking up and
running 4-1/2",12.6#, IBT-M, L-80 liner.
PU and RUN 4-1/2", 12.6#, L-80, IBT-M slotted liner.
Continue PU and RUN 4-1/2",12.6#, L-80, IBT-M slotted liner.
Ran 127 jts slotted liner, 10 jts solid liner, average MU torque
2200 FtLbs. A free floating 5-3/4" centralizer was run on each
joint, except the shoe joint.
MU seal bore extension, ZXP liner top packer and liner hanger
with liner running tool. RD 4-1/2" tbg equipment.
RIH with 4-1/2" liner on DP to 7-5/8" csg shoe @ 6870.
Circulate 1-1/2 X the string volume. 6 bpm @ 880 psi
Continue RIH with 4-1/2" liner on DP, break circulation every 15
stands. Record PIU and S/O weights every 500'.
MU top drive and break circulation. Drop setting ball. RIH and
tag up at 12190'. PU and space out liner top at 6446, shoe at
12184'. Stage up pump and pump ball on seat, 2 bpm @ 270
psi. Increase pressure to 2000 psi to set liner hanger, stack
·20k Ibs on liner to verify hanger set. Increase pressure to 4000
psi to set ZXP packer. Bled down pressure and closed annular,
tested packer to 1500 psi for 5 minutes.
Monitor well - static. POH with 4" DP.
Break out and LD liner running tool.
Clean and clear rig floor.
Service top drive, blocks and iron roughneck.
MU whipstock assembly. PU and Orient MWD.
PU 12 jts of 4-3/4" DC's and 24 jts of 4" HWDP.
RIH wi Whipstock Assembly on 4" DP to 6,399'.
MU top drive and orient whipstock. RIH and set whipstock
anchor and dummy seal assembly at 6,457'. Whipstock slide
oriented 14 deg left of highside. Set down whipstock trip anchor
wI 20,000# slackoff, stacked addtional1 0,000# on anchor to
ensure set. PU wI 10,000# overpull to check anchor set.
Stacked 40,000# on mill and sheared free from whipstock. PU
to neutral weight and rotated drill string to ensure mills sheared
free from whipstock slide. Top of whipstock at 6,397'.
Held PJSM. Displaced well bore from SFMOBM to MOBM.
Pump rate 3 bpm @ 1,200 psi. Total displacement 240 bbls.
Took returns of SFMOBM back to pit #3 and hauled to MI plant
for reconditioning. Circulated mud system one full surface to
surface to condition mud.
Mill window from 6397' to 6409'. Continue milling and dressing
window to 6423'.
WOM = 5 klbs
RPM = 100-110
GPM = 285 @ 1910 psi
Torque = 5-8k FtLbs
P/U 120k S/O 11 Ok ROT 105k
100 Ibs of metal recovered
Printed: 2n/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12114/2004 15:00 - 16:30 1.50 STWHIP P WEXIT Circulate 35 bbl hi-vis sweep around to clean metal from hole.
16:30 - 18:30 2.00 STWHIP P WEXIT ' Monitor well - static. Slug DP and POH with milling assembly.
18:30 - 20:30 2.00 STWHIP P WEXIT Stand back HWDP and DC's. LD milling BHA.
20:30 - 22:00 1.50 BOPSUP P WEXIT Flush and drain BOP stack. Pull wear bushing and install test
BOPSU~ P plug
22:00 - 22:30 0.50 WEXIT RU BOP test equipment fill stack with water.
22:30 - 00:00 1.50 BOPSUF P WEXIT Test BOPE to 3500 psi 1250 psi, test annular to 2500 psi 1250
psi for 5 minutes each. Witness of BOP test waived by John
Spaulding with AOGCC.
12/15/2004 00:00 - 04:00 4.00 BOPSUF P WEXIT Continue testing BOPE to 3500 psi 1250 psi, test annular to
3500 psi I 250 psi for 5 minutes each. Witness of BOP test
waived by John Spaulding with AOGCC.
04:00 - 04:30 0.50 BOPSUP P WEXIT RD test equipment, pull test plug. Drain water from stack to
cuttings box. Install wear bushing
04:30 - 05:00 0.50 STWHIP P WEXIT ¡ PJSM with Anadrill and all rig personnel on Picking up and
loading RA sources in BHA.
05:00 - 09:00 4.00 STWHIP P WEXIT PU and MU 6-3/4" directional BHA with Hycalog DS146X. Load
, RA sources and RIH.
I
09:00 - 13:00 I 4.00 STWHIP P WEXIT RIH with BHA #16 on DP. MU top drive and shallow test MWD
at 1000'. Break circ every 20 stands on trip in.
13:00 - 14:30 1.50 STCTPL P WEXIT Log down across 2 RA markers and confirm depths at 5933'
and 6055' MD DP measurement - OK. Obtain benchmark ECD
readings with PWD at 10.08 ppg @ 325 gpm and validate ECD
model.
14:30 - 15:30 1.00 STWHIP P WEXIT Cut drilling line.
115:30 - 16:00 0.50 STWHIP P WEXIT MU top drive, orient tool 14 degrees right and RIH passing
through window at 6397' without difficulty. Stage up pump and
I wash down to TD at 6423'.
16:00 - 00:00 8.00 DRILL P PROD2 Directional drill from 6423', to 6906' as per directional plan.
WOB = 5-8 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2820 psi on Btm, 2440 psi off Btm
Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm
P/U 120k 8/0 95k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.10 ppg
Actual ECD = 10.23 ppg
ART last 24 hrs. = 1.48 hrs.
AST last 24 hrs. = 1.63 hrs.
0.50 I DRILL Total drilling hours = 3.11 hrs
12/16/2004 00:00 - 00:30 P PROD2 Directional drill from 6906', to 7003' as per plan.
WOB = 5-10 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm
Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm
P/U 120k S/O 95k ROT 11 Ok
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/1 9/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12116/2004 00:00 - 00:30 0.50 DRILL P PROD2 Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
I Calculated ECD = 10.13 ppg
1.001 DRILL Actual ECD = 10.40 ppg
00:30 - 01 :30 N RREP PROD2 1 Repair top drive upper kelly valve actuator.
01 :30 - 07:00 5.50 DRILL ,P PROD2 ! Directional drill from 7003', to 7292' as per directional plan.
I
WOB = 4-7 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2550 psi on Btm, 2410 psi off Btm
Torque = 5-6k FtLbs on Btm, 5k FtLbs off Btm
P/U 120k S/O 95k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
I down stroke. Survey every 30'. Crossed fault at 6895' MD.
Calculated ECD = 10.19 ppg
Actual ECD = 10.20 ppg
07:00 - 09:00 , 2.00 DRILL N DPRB PROD2 Saw sudden increase in pump pressure of -700 psi and ECD
jump to 10.45 ppg shortly after making a connection. Suspect
cuttings avalanching uphole (in casing). Drilling in OBc shale
from 7050' MD. Backream out from 7292 - 7090' to clean up
hole. Getting back abundant amount of shale cuttings approx
1/8" - 1/4" cubes (angular). Continue slow backreaming until
hole cleaned up and pressure & ECD returned to normal. No
mud losses noted.
09:00 - 09:30 0.50 DRILL N DPRB PROD2 RIH to bottom - no problems.
09:30 - 13:00 3.50 DRILL P PROD2 Directional drill from 7292', to 7420' as per plan.
WOB = 5-10 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm
Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm
P/U 120k S/O 95k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.13 ppg
Actual ECD = 10.40 ppg
13:00 - 15:00 2.00 DRILL N DFAL PROD2 Cuirculate while attempting to reestablish communication with
MWDILWD tools.
15:00 - 16:30 1.50 DRILL N DFAL PROD2 Backream from 7420' to 7100' to clean hole prior to trip for
MWD.
16:30 - 18:00 1.50 DRILL P PROD2 Communication with MWDILWD re-established. Circulate hole
clean and RIH to bottom at 7420'.
18:00 - 23:00 5.00 DRILL P PROD2 Directional drill from 7420', to 7920' as per plan.
WOB = 5-9 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3010 psi on Btm, 2860 psi off Btm
Torque = 6k FtLbs on Btm, 5k FtLbs off Btm
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/16/2004 118:00 - 23:00 5.00 DRILL P PROD2 P/U 120k S/O 93k ROT 105k
Backream each stand at drilling rate, reducing pump rate on
I
I down stroke. Survey every 30'.
I Calculated ECD = 10.29 ppg
I 1.001 DRILL Actual ECD = 10.31 ppg
i 23:00 . 00:00 P PROD2 Saw pressure and ECD increase with corresponding increase
in 1/8" to 1/4" angular to blocky cutting sized shale pieces
I across shaker. Circulated weighted sweep surface to surface.
12/17/2004 00:00 . 00:30 0.50 DRILL P PROD2 Continue to circulate weighted sweep out of hole. Sweep
brought an increase in cuttings volume across shaker, mostly
1/4" to 1/8" angular to blocky shale and some fine sands.
00:30 . 02:30 2.00 DRILL P PROD2 Directional drill from 7920' to 8059' sliding as required to build
into the OBb as per plan.
WOB = 9-10 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3140 psi on Btm, 3040 psi off Btm
Torque = 5k FtLbs off Btm
P/U 123k SIO 93k ROT 1 OSk
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Added 1 drum of HRP to mud system to increase YP and gel
strength.
Calculated ECD = 10.31 ppg
Actual ECD = 10.71 ppg
02:30 - 03:30 1.00 DRILL P PROD2 i Circulate for ECD management, circulating HPR through
system.
03:30 - 07:00 3.50 DRILL P PROD2 Directional drill from 8059' to 8347' sliding as required to
maintain OBb contact as per plan.
WOB = 6-7 klbs
RPM Surf= 80, DH = 260
GPM:: 330 @ 3200 psi on Btm, 2970 psi off Btm
Torque = 5.5k FtLbs on Btm, 5k FtLbs off Btm
P/U 122k S/O 93k ROT 106k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.30 ppg
Actual ECD = 10.78 ppg
07:00 - 07:30 0.50 DRILL P PROD2 Circulate for ECD management.
07:30 - 12:00 4.50 DRILL P PROD2 Continue drilling ahead to 8636' MD. Switched from #2 to #1
,mud pump. MWD quit working shortly after switching pumps.
12:00 - 13:30 1.50 DRILL P PROD2 Circ and pump out of hole 5 stands to try and clear MWD . OK.
RIH to bottom.
13:30 - 00:00 10.50 DRILL P PROD2 Directional drill from 8636' to 9400' sliding as required to
maintain OBb contact as per plan.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12117/2004 13:30 . 00:00 10.50 DRILL P PROD2
WOB = 6-8 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3400 psi on Btm, 3100 psi off Btm
Torque = 8k FtLbs on Btm, 6k FtLbs off Btm
P/U 125k SIO 80k ROT 100k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
I
Calculated ECD = 10.76 ppg
Actual ECD = 11.11 ppg
ART last 24 hrs. = 2.88 hrs.
AST last 24 hrs. = 4.19 hrs.
Total drilling hours = 7.07 hrs
12/18/2004 00:00 - 08:00 8.00 DRILL P PROD2 I Directional drill from 9400' to 10143' sliding as required to
I maintain OBb contact as per plan.
WOB = 3-4 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3750 psi on Btm, 3440 psi off Btm
Torque = 6-7k FtLbs on Btm, 6k FtLbs off Btm
P/U 135k S/O 80k ROT 115k
Back ream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'. Circulate 15bbllo-vis sweep
around at 9906'. Slide one full stand to get top drive down to rig
floor for troubleshooting.
Calculated ECD = 10.76 ppg
Actual ECD = 11.18 ppg
08:00 - 11 :00 3.00 DRILL N RREP PROD2 After making a slide and connection, top drive would not rotate
I or back out of connection. Check out top drive - nothing
conclusive seen but possibly a bad encoder that controls TD
rotation.
11 :00 - 14:30 3.50 DRILL N RREP i PROD2 Get TD connection broken and back out with rotary table. POH
I to window for top drive repairs - also need to replace blower fan
I for motors in TD that failed previously.
POH to window - no pumping or backreaming possible.
Work thru tight spots at 9617',9554-44',9420',9340',9175',
9150-40'. Overpulls to 25 klbs.
14:30 - 21 :30 7.00 DRILL N RREP PROD2 Repair top drive. Replace encoder and purge moisture from
upper kelly valve airlines. Blow moter has failed, no spare on
Slope but will be able to drill ahead unitl new motor is available.
21 :30 - 22:30 1.00 DRILL N RREP PROD2 RIH to 7956'
22:30 - 23:30 1.00 DRILL N RREP PROD2 MU top drive, stage up pumps and break circulation. TD made
up on connection erratically.
Top drive saver sub threads have been stripped from pin when
making up the stand. Appears to be caused by improper
hook-up of new encoder that caused the connection to
overtorque.
23:30 - 00:00 0.50 DRILL N ¡RREP PROD2 LD damaged joint of 4" DP. POH to window to change top drive
I I
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/18/2004 23:30 - 00:00 0.50 DRILL N RREP PROD2 saver sub.
12/19/2004 00:00 - 01 :00 1.00 I DRILL N RREP PROD2 Continue POH to change out top drive saver sub.
01 :00 - 02:30 1.50 I DRILL N RREP PROD2 Change out top drive saver sub.
02:30 - 04:30 2.00! DRILL N RREP PROD2 RIH to 10132', make up top drive and break circulation at
0.50 I DRILL 8246'.
04:30 - 05:00 N RREP PROD2 Wash last stand to bottom at 10143'
05:00 - 00:00 19.00 DRILL P PROD2 Directional drill from 10143' to 11656', sliding as required to
maintain OBb contact as per plan.
WOB '" 4-5 klbs
RPM Surf", 80, DH '" 260
GPM '" 330 @ 3750 psi on Btm, 3440 psi off Btm
Torque", 6-7k FtLbs on Btm, 6k FtLbs off Btm
P/U 135k S/O 80k ROT 113k
Backream each stand at drilling rate, reducing pump rate on
I down stroke. Survey every 30'.
¡Calculated ECD '" 10.76 ppg
IActual ECD = 11.18 ppg
ART last 24 hrs. = 3.25 hrs.
I AST last 24 hrs. = 5.26 hrs.
00:00 - 05:30 I Total drilling hours", 8.51 hrs
12/20/2004 5.50 DRILL P PROD2 Directional drill from 11656' to 12160', sliding as required to
maintain OBb contact as per plan.
WOB = 4-5 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3640 psi on Btm, 3410 psi off Btm
Torque = 7-8k FtLbs on Btm, 7k FtLbs off Btm
P/U 147k 5/0 65k ROT 120k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
I PROD2 Calculated ECD = 10.85 ppg
Actual ECD = 11.02 ppg
05:30 - 07:00 1.50 DRILL P Circulate a 20 bbllo-vis sweep followed by a 20 bbl weighted
sweep surface to surface.
RPM = 80
330 gpm @ 3300 psi.
07:00 - 14:00 7.00 DRILL P PROD2 MU top drive and backream from 12160' to 10050'. Stands 2 &
3 took significant amount of backreaming - pressure increases
but no real increase in ECD as if reaming undergauge hole
rather than moving cuttings beds.
Continue backreaming - became much better above 11300'.
RPM = 95
GPM = 330 @ 3000 psi
114:00 - 15:00 Torque = 8-10k FtLbs
1.00 I DRILL P PROD2 CBU at 10050' - 330 gpm & 95 rpm. Circ until shakers cleaned
!
i
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12120/2004 14:00 - 15:00 1.00 DRILL P PROD2 up. Pull 3 stds dry - no problems, hole clean.
15:00 - 17:00 2.00 DRILL P PROD2 RIH to bottom.
17:00 - 22:00 5.00 DRILL P PROD2 Circulate BU X 3 to clean and condition hole.
RPM = 95
330 gpm @ 3350 psi.
Intial ECD = 10.50 ppg
Final ECD = 10.26 ppg
Calculated ECD = 10.86 ppg
SymOps:
PJSM. Transfer MOBM from pit module to 400 bbl upright
tanks.
22:00 - 22:30 0.50 DRILL P PROD2 PJSM with MI, Veco and all rig personnel on displacing well to
SFMOBM.
22:30 - 00:00 1.50 DRILL P PROD2 Displace well to Solids Free MOBM.
rate 145 gpm @ 1560 psi
12/21/2004 00:00 - 01 :00 1.00 DRILL P PROD2 Continue displacing well to Solids Free MOBM.
rate 145 gpm @ 1560 psi
01 :00 - 01 :30 0.50 DRILL P PROD2 Monitor well - static. Take slow pump rates. Blow down top
drive.
01 :30 - 05:00 3.50 DRILL P PROD2 POH from 12160 to the window at 6397'. No problems or tight
spots
05:00 - 06:00 1.00 DRILL P PROD2 Service top drive, blocks, crown and drawworks. Change oil in
top drive.
06:00 - 07:00 1.00 DRILL N RREP PROD2 Finish changing oil in top drive.
07:00 - 10:00 3.00 DRILL ,P PROD2 POH to BHA
10:00 - 12:30 2.50 DRILL P I PROD2 PJSM. Handle BHA. Remove nuclear source. LD LWD, MWD,
motor & bit DSX146H (RR3).
12:30 - 13:00 0.50 DRILL P PROD2 Clear & clean rig floor.
13:00 - 13:45 0.75 CASE P PROD2 RU to run 4.5" slotted liner.
13:45 - 14:00 0.25· CASE P PROD2 PJSM for running liner.
14:00 - 20:00 6.00 CASE P PROD2 Run 4.5" IBT-M slotted liner in OBb lateral per running order.
MU 4 jts solid liner, swell packer, 5 jts slotted liner and
aluminium billet liner top.
Depth in P/U wt S/O wt
1040' 49K 50K
2082' 58K 62K
3115' 70K 72K
4155' 81K 79K
4580' 85K 80K
20:00 - 00:00 4.00 CASE P PROD2 Run 4 1/2" slotted liner in OBb lateral on 4" DP.
Depth in P/U wt S/O wt
5553' 97K 90K
6510' 109K 94K
7470' 115K 92K
8430' 122K 91K
12/22/2004 00:00 - 02:30 2.50 I CASE P PROD2 - RIH w/4 1/2" slotted liner on 4" DP to TD @ 12160'.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/22/2004 00:00 - 02:30 2.50 CASE P PROD2
I Depth in P/U wt S/O wt
9387' 130K 82K
9674' 137K 85K
9950' 140K 87K
10230' 147K 93K
10415' 154K 92K
10605' 149K 93K
11080' 160K 87K
11560' 167K 83K
12035' 167K 80K
12160' 172K 81K
02:30 - 03:00 0.50 CASE P PROD2 - Tag bottom @ 12160' wi 5K. P/U off bottom to break over pt
I @ 172K & tag bottom w/1 OK. Establish circulation @ 100
GPM 960 psi & pick up string. Up wt 135K - shut down pump &
i continue picking up string.
String wt indicates off of liner.
03:00 - 07:00 4.00 CASE P PROD2 - POH wI 4" DP & UD aluminum billet running spear.
07:00 - 07:30 0.50 CASE P I PROD2 - Clear & clean rig floor.
07:30 - 08:00 0.50 STKOH P WEXIT - PJSM for P/U BHA.
08:00 - 10:30 . 2.50 STKOH P WEXIT - PIU & M/U BHA - 6 3/4" DSX 146 PDC bit, XP motor wI 1.5
deg bend, bypass sub, NM stab, NM flex lead collar, MWD,
PWD, ADN, 2 NM flex DC's, XO, & jars.
10:30 - 14:00 3.50 STKOH P WEXIT - RIH from 209' to 6376' filling every 25 stands.
- Shallow test MWD @ 1165' - 330 GPM, 1700 psi.
14:00 - 15:00 1.00 STKOH P WEXIT - PJSM - slip & cut drilling line.
115:00 -18:00 3.00 STKOH P WEXIT - PJSM - R/U & transfer MOBM from upright tanks & displace
well from solids free MOBM to MOBM. 330 GPM, 2350 psi, 75
RPM & reciprocating.
. - Establish clean hole ECD's at 6376' as follows:
GPM RPM Pump Pressure ECD
280 0 1655 9.84
280 60 1655 9.92
330 0 2350 10.02
i 330 60 2350 10.05
I
18:00 - 20:00 I 2.00 STKOH P WEXIT - RIH to 6526' - Wash from 6526' to top of billet @ 7581' DPM.
70 GPM 300 psi 20 RPM.
20:00 - 22:00 2.00 STKOH P WEXIT - Trench from 7574' to 7581' @ 330 GPM 2800 psi.
22:00 - 00:00 2.00 STKOH P WEXIT - Time drill @ 2 FPH for 2' & 4 FPH for 4' to sidetrack off of
I billet @ 330 GPM 2800 psi.
- Fine granules of aluminum seen @ shakers on B/U.
12/23/2004 00:00 - 02:00 2.00 DRILL P PROD3 - Time drill @ 4 FPH for 4' & 12 FPH for 10'. Sidetrack off of
aluminum billet successful. PU above billet and make a pass
by the billet - pumps on. OK.
- 100% slide @ 330 GPM 2820 psi
02:00 - 12:00 10.00 DRILL P PROD3 - Drill directionally in 6 3/4" hole from 7601' to 8250'
backreaming each stand at full drilling rate & reducing pump
rate to 75% on downstroke.
- WOB 6K, 330 GPM, PP off bottom 2850 psi, on bottom 3150
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12123/2004 02:00 - 12:00
10.00! DRILL P
PROD3 psi, 80 RPM, Tq on bottom 7K, Tq off bottom 6K.
. PIU wt 125K, SIO wt 93K, Rot wt 105K.
. Calculated ECD 10.36, actual ECD 10.63.
12:00·00:00
12.00 DRILL P
AST 2.98 hrs, ART 1.18 hrs, ADT 4.16 hrs.
PROD3 - Drill directionally in 6 3/4" hole from 8250' to 9493'
backreaming each stand at full drilling rate & reducing pump
rate to 75% on downstroke.
! - WOB 5-8K, 330 GPM, PP off bottom 2830 psi, on bottom
3250 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K.
- P/U wt 130K, SIO wt 75K, Rot wt 107K.
- Calculated ECD 10.65, actual ECD 11.0.
12/24/2004 00:00 - 12:00
12.00 DRILL P
- AST 2.43 hrs, ART 2.72 hrs, ADT 5.15 hrs.
PROD3 - Drill directionally in 6 3/4" hole from 9493' to 10526'
backreaming each stand at full drilling rate and reducing pump
rate to 75% on downstroke.
- WOB 5-8K, 330 GPM, PP off bottom 3200 psi, on bottom
3500 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K.
- P/U wt 145K, SIO wt 77K, Rot wt 115K.
- Calculated ECD 10.79, actual ECD 10.96.
12:00 - 00:00
12.00 DRILL P
- AST 2.69 hrs, ART 2.36 hrs, ADT 5.05 hrs.
PROD3 - Drill directionally in 6 3/4" hole from 10526' to 11437'
backreaming each stand at full drilling rate and reducing pump
rate to 75% on downstroke.
-WOB 5-8K, 330 GPM, PP off bottom 3250 psi, on bottom
3600 psi, 80 RPM, Tq on bottom 9K, Tq off bottom 8K.
- P/U wt 154K, SIO wt 65K, Rot wt 115K.
- Calculated ECD 10.49, actual ECD 10.76.
12/25/2004 00:00 - 06:30
6.50 DRILL P
- AST 2.43 hrs, ART 2.85 hrs, ADT 5.28 hrs.
PROD3 - Drill directional in 6 3/4" hole from 11437' to TD @ 12043'
MD. Backream each stand at full drilling rate & reduce pump
rate to 75% on downstroke.
I
- WOB 5-8K, PP off bottom 3260 psi, on bottom 3700 psi, 80
RPM,
Tq on bottom 10K, off bottom 9K.
- P/U wt 165K, SIO wt 60K, Rot wt 115K.
- Calculated ECD 10.71, actual ECD 10.89
06:30 - 10:00
3.50 DRILL P
- AST 1.12 hrs, ART 2.07 hrs, ADT 3.19 hrs.
PROD3 - Circ lo-vis sweep surface to surface. Circ until actual ECD
was 10.78 vs 10.74 calculated.
PROD3 - Monitor well while blowing down TD.
PROD3 - POH for check trip to window. Hole condition v. good - no
pump or backreaming required.
- Pump out past billet and saw 10k overpulls - stabilizer on
ADN. Nothing when bit went across billet. Orient 120L and stop
10:00 - 10:30
10:30 - 17:30
0.50 DRILL P
7.00 DRILL P
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/25/2004 10:30 - 17:30 7.00 DRILL P PROD3 pump. Run in below billet and back up above - no obstructions,
no overpulls.
- Continue POH to window.
17:30 - 19:00 1.50 DRILL P PROD3 - RIH to 50' above billet - M/U TD & orient 90L. RIH wlo pump
I & tag billet @ 7581' wi 5K. P/U above billet, turn on pump, & in
! ! 30L setting. Orient 120L & RIH past billet wI no problem.
119:00 - 21:30 2.50 DRILL P PROD3 - RIH to TD @ 12043' - hole slick.
121 :30 - 23:00 1.50 DRILL P , PROD3 - Pump lo-vis weighted sweep & circ surface to surface @ 330
I GPM 3700 psi, 90 RPM & reciprocating.
I - Calculated ECD 10.76, actual ECD 10.8 to 10.85.
- Prepare for displacement by reducing surface volume. Pump
100 bbls MOBM into tank farm. Take on SFMOBM into pit 3.
23:00 - 00:00 1.00 DRILL P PROD3 - Displace MOBM wi SFMOBM @ 285 GPM 2650 psi, 90 RPM
& reciprocating.
12/26/2004 00:00 - 01 :15 1.25 DRILL P I PROD3 - Displace MOBM wI SFMOBM @ 285 GPM 2650 psi, 90 RPM,
& reciprocating.
01: 15 - 01 :30 0.25 I DRILL P PROD3 - BID TD - monitor well - static.
01 :30 - 05:30 4.00 I DRILL P PROD3 - POH to 6000' - hole in excellent shape wI maximum 5K drag.
No sign of billet while pulling by wI ADN stab or bit.
05:30 - 06:30 1.00 DRILL P PROD3 - Service TD.
- Monitor well.
06:30 - 11 :30 5.00 DRILL P PROD3 - POH to 684'.
11 :30 - 19:00 7.50 DRILL N WAIT PROD3 - Stab TIW valve in string - monitor well wi hole fill pump on
I ! while waiting for weather to improve. Phase 3 conditions.
- 6.5 bblloss for 7.5 hrs.
19:00 - 19:30 0.50 DRILL P PROD3 - PJSM for handling BHA & source - POH to BHA.
19:30 - 21 :30 2.00 DRILL P PROD3 - UD BHA.
21 :30 - 22:00 0.50 CASE P PROD3 - Clear & clean floor.
22:00 - 22:30 0.50 CASE P PROD3 - Service TD & drawworks.
22:30 - 00:00 1.50 FISH P PROD3 - M/U Whipstock retrieving BHA as follows: Fixed lug retrieval
hook, 1 jt 3 1/2" HWDP, bumper sub, oil jars, float sub, MWD,
&XO.
12/27/2004 00:00 - 00:30 0.50 STWHIP P PROD3 - Continue M/U whipstock retrieving BHA.
00:30 - 02:00 1.50 STWHIPiP PROD3 - RIH wI 8 stands HWDP.
I - Shallow test MWD & BID TD.
02:00 - 03:30 1.50 STWHIPI P PROD3 - RI H wI whipstock retrieval ass'y on 4" DP to 4178'.
03:30 - 04:00 0.50 STWHIP P PROD3 - CBU to condition mud @ 285 GPM 1180 psi.
- BID TD.
04:00 - 06:00 2.00 STWHIP P PROD3 - RIH wI 4" DP to -30' above whipstock. Fill pipe & orient hook
wi MWD.
- P/U wt 130K, 5/0 wt 105K.
- RIH to 5' below top of whipstock @ 6402'. Engage slot in
I whipstock face - OK. P/U & release whipstock wi 65K over.
1.001 STWHIP P - Monitor well.
06:00 - 07:00 PROD3 - CBU @ 250 GPM 1100 psi.
07:00 - 12:00 5.00 STWHIP P PROD3 - POH wi 4" DP to BHA.
12:00 - 14:00 2.00 STWHIP P , PROD3 - UD BHA.
- Clear floor of tools & clean floor.
14:00 - 15:00 1.00 CASE P PROD3 - PJSM - R/U 4 1/2" liner running equip't.
15:00 - 19:00 4.00 CASE P PROD3 Run 4.5" slotted liner to 2484'.
19:00 - 20:00 1.00 CASE N RREP PROD3 Replace casing tongs.
20:00 - 22:30 2.50 CASE P PROD3 Continue running 4.5" slotted liner.
22:30 - 23:30 1.00 CASE N RREP PROD3 Replace cable on laydown machine.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
5-213
5-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12127/2004 23:30 . 00:00 I 0.50 CASE P PROD3 Continue running 4.5" slotted liner to 4000'.
12/28/2004 00:00 - 03:30 3.50 CASE P PROD3 - RIH w/4 1/2" guide shoe jt, 116 jts 41/2" slotted liner & 16 jts
4 1/2" solid liner.
· Avg M/U tq 3500 ftllbs.
03:30 . 04:00 0.50 CASE P PROD3 · CIO to 3 1/2" elevators.
I - P/U & M/U hook hanger. Total length of liner, hook hanger, &
i associated pup jts 5627.99'.
I · UD tubing tongs.
04:00 - 11 :30 7.50! CASE P PROD3 - RIH wi 41/2" liner on 4" DP to 11921'.
I i' Worked through window on 2nd attempt after picking up
I above it & rotating string 1/2 turn.
:. Did not see aluminum billet @ 7581'.
111 :30 - 18:30 7.00 CASE P PROD3 · Attempt to hook hanger on window wlo success. Able to run
I hook 10' below window, but unable to get beyond 12017'. (TD
I @ 12043')
18:30 - 00:00 5.50 CASE N DFAL PROD3 - Monitor well.
- POH to 7255' wI 4" DP slowly (3-4 min per stand) to prevent
I swabbing due to swell packers.
'- Strapping DP while POH.
12/29/2004 00:00 - 01 :00 1.00 CASE N DFAL PROD3 · POH wI 4" DP to hook hanger.
- 1.84' difference in tally & SLM.
01 :00· 03:30 2.50 \ CASE N DFAL PROD3 - C/O elevators & PIU hook hanger & inspect. No damage to
hook or hanger.
R/U casing tongs & UD hook hanger & ball catcher assy.
- UD 1 jt 4 1/2" slotted liner.
I - MIU hook hanger & ball catcher assy.
- UD casing tongs.
03:30 - 11 :00 7.50 CASE N DFAL PROD3 - RIH wI hook hanger on 4" DP to 7013'
· Tag up on liner tie back @ 6465" - P/U above TOW & rotate
string 1/2 turn. Made it through window on 2nd attempt.
- RIH to 11,900'
11 :00· 14:00 3.00 CASE N DFAL PROD3 1- String Wt. down 75-50k, up 170k
- Attempted to set hook wlo success. Able to work hook 10'
outside window, could not get below 11,976'. Decided to POOH
6.50 I CASE and dress window.
14:00 - 20:30 N DFAL PROD3 - POH with 4" DP to hanger.
20:30· 21 :30 1.00 CASE N DFAL PROD3 i-Change elevators 3 1/2"
· UD hanger
- Change elevators to 4 1/2"
21 :30· 00:00 2.50 CASE ,N DFAL PROD3 - PJSM - discussed risks associated with laying down liner
I · POH UD 16 jts 41/2" solid liner, 8 jts 41/2" slotted liner 1 x 1.
- UD 2 swell packers. Original OD 6.4" - currently 6.53"
12/30/2004 00:00 - 07:30 I 7.50 CASE N DFAL PROD3 - POOH wi 4 1/2" slotted liner.
· Total jts. UD, 115 slotted, 16 solid, 1 shoe jt, 2 swell packers
and 1 hook hanger.
07:30 - 08:30 1.00/ CASE N DFAL PROD3 - Monitor well
- RID TBG equipment
i - Clear/clean rig floor
08:30 - 09:00 0.50 BOPSUP P PROD3 - PJSM
- Pulled wear bushing
- Set test pi ug
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12130/2004 08:30 - 09:00 0.50 BOPSUF P PROD3
109:00 - 13:30 4.50 I BOPSUP P PROD3
I
13:30 - 14:30 1.00 BOPSUP P PROD3
14:30 - 15:00 0.50 CASE N DFAL PROD3
15:00 - 17:30 2.50 CASE N DFAL PROD3
17:30 - 20:00 2.50 CASE N DFAL PROD3
I
20:00 - 23:00 3.00 I CASE N DFAL I PROD3
23:00 - 00:00 1.00' CASE N DFAL PROD3
12/31/2004 00:00 - 05:00
5.00 CASE N
05:00 - 07:00 2.00 CASE N
07:00 - 11 :00 4.00, CASE N
11 :00 - 12:00 1.00 CASE N
12:00 - 12:30 0.50 CASE N
12:30 - 13:30 1.00 CASE N
13:30 - 17:00 3.50 CASE N
17:00 - 21 :00 4.00 CASE N
· R/U test equipment
- Test BOPE's
- 3,500 psi. highl 250 psi. lowl 5 min.
· Witness of test wavied by John Chrisp (AOGCC)
,- Pull test plug
- Install wear bushing
· Blow dn. test lines
- RID test equipment
- Cut apart bent shoe jt. & slotted jt. wI Wachs cutter
- Clean out under rotary table (dried excess drilling fluid)
- CIO air boot
- PJSM
- Build window polish mill assy. (2 ea. string mills @ 6 3/4" OD)
- Test MWD before proceeding in hole
- RIH wi 4" DP to 6300' (63 stds DP)
- Fill DP ever¡ 2000'
- Orient bent jt. I MWD to 15 deg. left of HS and RIH to 6388'
- P/U std # 64 & reorient and attempt to slide out window (TOW
@ 6397' & BOW @ 6409'). Bottomed out in tie back sleeve @
6461'. No success after repeated attempts.
DFAL PROD3 - Attempt to exit window wi polish mill assy. (circ. & non-circ.)
- Positionlorient string @ 90 deg. increments & attempt exit
- Rotate @ 6393' @ 10 rpm w/steady 3500 ftllbs torque.
Repeat @
6405' (middle of window) with same results.
- Rotate fl 6390' to 6420' @ 5 rpm wI 3000 ftllbs steady
torque, (rotary limit set @ 3500 ftllbs.). Attempting to stall
drill string @ window. No success
- Position/orient string @ 45 deg. increments & attempt exit
- POH to 6358' (UD 1 jt.), orient to 9 deg. left of HS. RIH &
P/U 1 jt. and bottom out in tie-back sleeve @ 6461'.
· Same as above but @ 14 deg. left of HS, no success.
DFAL PROD3
DFAL I PROD3
DFAL PROD3
DFAL PROD3
DFAL PROD3
DFAL PROD3
DFAL PROD3
- PJSM
· Slip & cut drilling line.
- POH w/4" DP
- Pooh w/BHA, BIO & UD same
- Clear & clean rig floor
- PJSM
- Strap and MIU BHA
- RIH wI polish mill assy. #2 on 4" Dp to 6310'
· String Wt. Up 130K, Dn 100K
- Orient bent jt. wi MWD
- Pump Rate 80 spm @ 1340 psi.
- During orienting process tagged btm of window @ 6409'.
Unable to exit window after final orientation of bent jt./ MWD
- Repeated attempts made wI different tool orientations WIO
success
· While roating Dn @ 5 rpm, wi 5,000 ft./lbs torque and running
speed of 30 fpm tagged Btm of window @ 6409', string torqued
up and stalled. Unable to pull free with up wt. of 130K.
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12131/2004 17:00 - 21 :00 4.00 CASE N DFAL PROD3 Released torque and applied 2 rds. to the left in 1/2 turn
and worked torque Dn. Gradually increasing pick up
wt. by 5,000 lb. increments. String pulled free @ 160K,
proceeded to RIH and tag tie-back.
- Repeated rotating Dn process same as before and tagged
again. Continued to apply Rt. hand torque to 7,000 ft./lbs and
increase bit wt. to 35K. String broke free and proceeded to RIH
to 6465' to confirm string outside window.
21 :00 - 22:00 1.00 CASE N DFAL PROD3 - RIH to 6740' (bull nose depth), confirmed mills pass through
window before prior start of dressing process.
- Dress window w/20,25 & 30 rpm, 350 gpm pump w/1600 psi.
- Work mills f/6390' t/6415' to dress window.
- Work mills f/6415 t/ 6455' to dress open hole.
- After dressing Up Wt. 125K, Dn Wt. 1 OOK W 10 rotating or
circulating.
- No abnormal Up Wt. or Dn. Wt. after dressing
- 22:30 0.50 CASE N DFAL PROD3 - POH t/6350'
- 23:30 1.00 CASE N DFAL PROD3 - Circ B/U @ 300 GPM 1350 psi.
- Monitor well
- 00:00 0.50 CASE ,N DFAL PROD3 - POH w/ mills
1/1/2005 00:00 - 03:30 3.50 CASE N DFAL PROD3 - POH w/polish mill assy. to BHA
03:30 - 05:30 2.00 CASE N DFAL PROD3 ' -UD BHA
05:30 - 06:00 0.50 CASE N DFAL PROD3 - Clear floor of excess BHA tools
- Clean floor
06:00 - 07:30 1.50 CASE N DFAL PROD3 - PJSM
IDFAL - R/U Tbg. handling equip. to RIH w/4 1/2" slotted liner
- 16:00 8.50 CASE N PROD3 - M/U & RIH with 4 1/2" liner.
I I - Avg. make up torque 3600 ft./lbs.
I - 1 solid shoe jt., 116 jts. 4 1/2" slotted liner, 16 jts. 4 1/2" solid
liner, 2 swell pkr. assy.
16:00 - 16:30 0.50 i CASE N DFAL PROD3 - C/O elevators
I - M/U 7 5/8" x 41/2" Hook hgr.
I - String wt. Up 97K
I - String wt. Dn 87K
16:30 - 17:00 0.50 I CASE N DFAL PROD3 - RID Tbg. handling equip.
- R/U to RIH wi 4" DP
17:00 - 17:30 I 0.50 I CASE N DFAL PROD3 - RIH wI slotted liner on 4" DP to 6461' (Tagged up on tie-back)
I
17:30 - 19:00 I 1.50 CASE N DFAL PROD3 - UD 2 jts. DP and P/U Std. # 10 of 4" DP (needed full std. to
orient and exit window, allowing tag up on tie-back if needed)
- Orient 1/4 turn to right and attempt exit window (no success)
I PROD3 - Add another 3/4 turn (1 turn total) and exit window
- P/U 2 jts. DP (same ones that were UD) and continue to RIH
19:00 - 23:30 4.50 CASE N DFAL - RIH wi slotted liner on 4" DP
- Tagged Billet in OBd lateral @ 7581' (rotate 1/2 turn to right
and work by same, no problem)
i 23:30 - 00:00 0.50 CASE N DFAL PROD3 - Liner stopped @ 11215', Up Wt. 175K, Dn Wt. 75K
- Reciprocate f/11,180' t/ 11215'
- Rotate 1 turn rt. & work torque dn.
- Add 1 more tum rt. & work pipe
- Add 3 more turns & work pipe until all torque gone. No
success
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/1/2005 23:30 - 00:00 0.50 CASE N IDFAL PROD3
1/2/2005 00:00 - 00:30 0.50 CASE N DFAL PROD3 - UD 1 jt. (for longer stroke when reciprocating)
- Rotate 1 turn rt. and reciprocate pipe and using drawworks
braking action to work through tight spot @ 11215'
00:30 - 01 :30 1.00 CASE N DFAL PROD3 - RIH wi liner on 4" DP tJ 11,971'.
,- Up Wt. 167K
101 :30 - 03:00 - Dn Wt. 60K
1.50 I CASE N DFAL PROD3 - POH tJ 11,965' (hook hgr. @ 6392')
i - Apply 1 1/2 turns rt, unhook hanger and work pipe dn. to
11,980'
- POH tJ 11,955'
- Apply 3/4 turn rt. and work torque dn & attempt to hang hook
hanger wlo success..
- Apply 1/2 turn and work torque dn. and hang off hgr.
- P/U 10' and unseat hgr. and rehang same. (0215 hrs)
- Drop 1 3/4" ball and chase w/30 spm @ 300 psi to seat same
- Pressure up to 3,000 psi and release from liner
- P/U and verify running tool released from liner
- P/U Wt. 138K
- S/O Wt. 112K
- POH tJ 6360'
03:00 - 03:30 0.50 CASE P PROD3 - CBU @ 66 spm @ 1750 psi (2300 calc. stks)
03:30 - 04:30 1.00 CASE P PROD3 - RIH and tag top of Hook Hgr. @ 6392'
- Blow Dn Top Drive
- Monitor well
04:30 - 07:30 3.00 CASE ¡p PROD3 - POH wI 4" DP
07:30 - 08:00 0.50 CASE P PROD3 - B/O & UD liner running tool
I
08:00 - 09:00 1.00 CASE ¡P PROD3 - Clean & clear rig floor
09:00 - 09:30 0.50 CASE P PROD3 - PJSM
- R/U to RIH wI LEM #1 & inner string
09:30 - 12:30 3.00 CASE P PROD3 - M/U LEM #1 Assy.; Seal Assy.-3 x 41/2" pup jts.; Window
Assy.-
4 1/2" pup jt., Casing Swivel, Seal Bore Ext. (inner string- 2 x 2
7/8" tbg. jts., 2 x 2 7/8" pup jts., Seal,s & Nozzle Assy.), ZXP
Pkr. wi Tie-Back Assy.
12:30 - 19:00 6.50 CASE P PROD3 - RIH wi LEM #1 on 4" DP to 6390' (top of hook hgr. @ 6392').
I - Running speed as per Baker Rep. was 30' prl min.
- Up Wt. 135K
- Dn Wt. 112K
19:00 - 20:00 1.00 CASE P PROD3 -Tagged Hook Hgr. top @ 6392'
- Apply 1 1/2 turns to right & RIH tJ 6462'
- Up Wt. 137K
- Dn Wt. 11 OK
- Continue tJ RIH & tag @ 6481'
- Apply 1 1/2 turns & RIH, wlo success
- Brk circ. @ 3 bpm @ 490 psi & circ. dn tJ 6490' (mule shoe
depth). - LEM locator tagged up in Hook Hgr. Collet Profile
@ 6392'
- P/U 10' & 8/0 to verify LEM engaged wi 20,000# on Pkr.
20:00 - 22:00 2.00 CASE P PROD3 - Brk. TD connection & drop 1 3/4" pkr. setting ball
- Circ. Ball Dn. @ 2 bpm @ 430psi. (bumped ball with 537 stks)
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/2/2005 20:00 - 22:00 2.00 CASE P PROD3 - P/U V 2800 psi. to set ZXP Pkr. (hold 5 min), bleed off
pressure
- Close upper pipe rams to test ZXP Pkr. x 7 5/8" csg. tJ 1500
psi., Unable to pressure up (pumped 9 bbls 1104 stks. to 700
psi.), bleed off excess pressure. Suspect Pkr. not fully set.
- Open Rams
- Pressure up DPI Pkr. V 4000 psi. to reset Pkr. (observed
string wt. fluctuation of app. 10/15000 Ibs), hold 5 min. & bleed
off pressure. Also released running tool during this process.
'- Close top rams & retest Pkr x 7 5/8" csg. wI 1500 psi.,
successful
- Pick up 20' (out of pkr.) & rotate dn @ 25 rpm to verify Pkr.
set. Tag LEM tie-back @ 6335', Pkr set @ 6346'
- POH wI circ. sub V 6332'
22:00 - 23:00 1.00 CASE P PROD3 - Circ. S/U 6332' (reciprocating Dp) @ 6 bpm @ 1100 psi.
(calc. stks 2400)
I - Blow Dn. TD
I
123:00 - 00:00 1.00 CASE 'P PROD3 - POH wI LEM running tool on 4" DP
1/3/2005 00:00 - 02:30 2.50 CASE P PROD3 - POH wI LEM running tool on 4" Dp
02:30 - 03:00 0.50 CASE P PROD3 - R/U 2 7/8" handling tools & equip. to UD inner string
03:00 - 03:30 0.50 CASE P PROD3 - S/O & UD LEM Running Tool
03:30 - 04:30 1.00 CASE P PROD3 - UD 2 7/8" Inner string
04:30 - 05:00 0.50 CASE P PROD3 - RID 2 7/8" handling tools & equip.
05:00 - 06:00 1.00 CASE P PROD3 - Clear & Clean rig floor
06:00 - 09:30 3.50 P WEXIT - PJSM
- M/U Whipstock BHA fl OBa lateral (SHA length=1437.90')
- Orient MWD V Whipstock
- Shallow test MWD wi 200 gpm, Tool Pulse 360/460 psi.
,- SHA to Top of Slide------1196.74'
51 stds 4" Dp + 25.47'---4908.10'
Depth to Top of Slide-----61 07.87'
09:30 - 14:00 4.50 STWHIP' P WEXIT - RIH wI Whipstock BHA on 4" Dp tJ 6323'
- Run speed 90'1 min.
- String Wt. Up 145K, Dn 110K
14:00 - 14:30 0.50 STWHIP P WEXIT - Engaged Pump, 300 gpm @ 1980 psi.
I - Reciprocate Dp & Orient Whipstock to 14 deg. Left (obtained
4 good tool faces)
,- RIH & set Whipstock Anchor, Top of Whipstock Slide @
6108'
- P/U to 15K overpull to verify Whipstock set
- S/O and stacked 42K & Sheared Mills free
14:30 - 16:30 2.00 STWHIP P WEXIT - PJSM
- Displace Well bore fluid tJ MOSM
- 260 bbls @ 300 gpm @ 1980 psi
- Circulated 2 X B/U to condition mud
16:30 - 21 :30
5.00 STWHIP P
WEXIT
- Mill Window f/6108' V 6120' (TD @ 6138')
- WOM 2-3K, RPM 75-100
- Torque 8,000-9,000 tv Ibs
- Pump 320 gpm @ 1800 psi
- String Wt. Up 145K, Dn 107K
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/3/2005 16:30 - 21 :30 5.00 STWHIP P WEXIT - Retrieving Slot @ 6113' @ 14 deg. Left
21 :30 - 22:30 1.001 STWHIP P WEXIT - Circ. Sweep S/S (Sweep = 40 bbl MOBM + 55 gal. dm HRP)
- Pump 320 gpm @ 1800 psi.
- Ream & back ream window while sweep going around BHA
- RIH through window dry before POH-no problem
- Monitor Well -Static
22:30 - 23:00 0.50 STWHIP P WEXIT - POH II 5600'
23:00 - 00:00 1.00 STWHIP P WEXIT - PJSM
- Slip and Cut Drlg Line
1/4/2005 00:00 - 02:00 2.00 STWHIP P WEXIT - PJSM
, - Slip & Cut 473' bad Drlg Line
02:00 - 04:00 2.001 STWHIP P WEXIT - POH wI Whipstock Mill Assy.
04:00 - 06:30 2.501 STWHIP P WEXIT - B/O & UD Baker Milling Tools
1.50 I STWHIP P - Stand back collars and HWDP
06:30 - 08:00 WEXIT - Clear rig floor of BHA components
. - Clear rig floor & under rotary table
08:00 - 08:30 0.50 STWHIP P WEXIT 1- Rig Service
08:30 - 12:30 4.00 STWHIP N RREP WEXIT - Repair Top Drive
12:30 - 13:30 1.00 STWHIP P WEXIT - M/U Stack Washer
- Functioned BOPE stack & washed to remove metal cuttings
- Flushed Choke, Kill & Flow lines
- Blow Dn. TD, Kill & Choke lines
13:30 - 16:00 2.50 STWHIP P WEXIT - PJSM
I - P/U & M/U 6 3/4" Driectional Drlg. Assy.
I - Cleared rig floor, installed Radioactive sources
i - Continue to build BHA
16:00 - 19:30 3.50 STWHIP P WEXIT - RIH wI BHA on 4" Dp
- Shallow pulse test MWD
1.001 STWHIP P - Continue RIH II 6050'
19:30 - 20:30 WEXIT - Establish circulation & Drilg. parameters
- String Wt. Rot. 11 OK
- Up Wt. 120K, Dn Wt. 105K
,- ECD 10.0 ppg (calculated)
- Pump 330 gpm @ 2300 psi
- Set Tool Face 14 deg. left
- Slide through window (6108'-6120') wlo pump II 6130'
- Circ Dn. fl 6130' II 6138'
20:30 - 00:00 3.50 DRILL P PROD4 - Drlg. f/6138' 116340' (rotating & sliding)
i - WOB Sliding 3/4K
1- Wob Rot. 5K
- Rpm 60
- Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftllbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2300 psi, On Btm 2400 psi
- Calc. ECD 10.0, Act ECD. 10.2
1/5/2005 00:00 - 02:30 2.50, DRILL P PROD4 - Drlg. fl 6340' II 6528' (rotating & sliding)
- WOB Sliding 3/4K
- WOB Rot. 5K
,- Rpm 60
- Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftllbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2300 psi, On Btm 2400 psi
- Calc. ECD 10.0, Act ECD. 10.2
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/5/2005
02:30 - 03:00
0.50 DRILL
P
PROD4 - Circulate, as per Geolgist (waiting on MWD logs)
- Pump Hi-Vis Sweep (40 bbl MOGM + 55 gal HRP)
- Pump Rate 330 gpm @ 2250 psi.
- Reciprocating, oriented high-side
PROD4 - Drlg. fl 6528' tJ 7292' (rotating & sliding)
1- WOB Sliding 3/4K
- WOB Rot. 7/8K
- Rpm 80
- Torque- Off btm 5,000 ftJlbs, On Btm 6,000 ftJlbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2400 psi, On Btm 2600 psi
- Calc. ECD 10.18, Act ECD. 10.4
- Strg. Wt. Up 122K, DN 93K, Rot. Wt 108K
03:00 - 12:00
9.00 I DRILL
P
12:00 - 00:00
12.00 DRILL
P
PROD4 - Drlg. f/7292' tJ 8444' (rotating & sliding)
- WOB Sliding 2K
- WOB Rot. 3/4K
- Rpm 80
- Torque- Off btm 7,000 ftJlbs, On Btm 9,000 ftJlbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2610 psi, On Btm 2760 psi
- Calc. ECD 10.4, Act ECD. 10.5
- Strg. Wt. Up 125K, DN 88K, Rot. Wt 109K
PROD4 - Drlg. f/8444' tJ 9310' (rotating & sliding)
- WOB Sliding 4K
- WOB Rot. 5K
- RPM 80
- Torq. On 8tm. 7K, Off Btm. 6K
- Pump Rate 330 gpml 92 spm
- Pump Press. Off Btm. 3100 psi, On Btm 3300psi
- Strg. WI. Up 127K, Dn 98K, Rot. 105K
- Calc. ECD. 10.47, Act ECD. 10.39
- SPR #1 30 spm=590 psi
40 spm= 780 psi
- SPR #2 30 spm=700 psi
40 spm=880 psi
- ART =6.71 hrs. AST =1.29 hrs.
1/6/2005
00:00 - 12:00
12.00 DRILL
P
12:00 - 00:00
12.00 DRILL P
PROD4 - Drlg. f/9310' tJ 10,433' (rotating & sliding)
- WOB Sliding 5/22K
- WOB Rot. 4K
- RPM 80
- Torq. On Btm. 8K, Off Btm. 6K
- Pump Rate 330 gpml 92 spm
- Pump Press. Off Btm. 3,000 psi., On Btm. 3100 psi.
- Strg. Wt. Up 139K, Dn.94K, Rot. 113K
Pnnted: 21712005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/6/2005 12:00 - 00:00 12.00 DRILL P PROD4 - Calc. ECD 10.25, Act ECD 10.27
- ART =3.51 hrs., AST =2.82 hrs.
1/7/2005 00:00 - 10:30 10.50 DRILL P PROD4 -Drlg. f/1 0,433' t/11,006' (rotating & sliding)
- WOB; Sliding 22/25K, Rot 5K
- RPM 80
- Torq. Off Btm. 6K, On Btm 8K
- Pump Rate 330 gpml 92 stks
- SSP; On Btm 3150 psi., Off Btm 3000 psi
- Strg. Wt., Up 139K, Dn. 94K, Rot 113K
- ECD; Calc. 10.39, Act 10.43
- SPR #1 30 spm=680 psi.
I 40 spm=850 psi.
- SPR #2 30 spm=680 psi.
40 spm=880 psi.
- Observed intermittent high torque causing rotary to stall (
torque limiter set at 12,000 ftJlbs). Decision was made to back
ream through inverted section of low permeability zone fl
10,150' t/10,900'
10:30 - 14:30 4.00 DRILL P PROD4 - Backream f/11,006' t/9,950' Through inverted low
permeability section.
- RPM 80, Torque 7-9K
- Pump rate; 330 gpm @ 2950 psi.
- String stalled out @ 15,000 ftJlbs torque @ following depths;
-10,900'-10850',10,725'-10,700',10,600'-10,575',
10,488'-10,450'
I 10,358'-10,298',10,164'-10,138',10.094'-10,044'
- RIH t/11,006'
14:30 - 16:00 1.50 DRILL P PROD4 - Reciprocate & rotate @ 11,006' while circulating
- Pump & circ. 40 bbl. weighted sweep SIS
- Pump rate 330 gpm @ 2850 psi.
I - RPM 80
16:00 - 18:30 2.50' DRILL P PROD4 - Drlg 1/11,006' t/11,197' (rotating & sliding)
- WOB; Sliding 25K, Rot. 4K
- RPM 80
- Torque; On Btm. 8/10K, Off Btm. 7K
- Pump; 330 gpm/92 stks.
- SSP; On Btm 3130 psi., Off Btm 2980 psi.
- Strg Wt.; Up 140K, Dn. 87K, Rot. 115K
- ECD; Calc. 10.53, Act. 10.54
- Rotary on TD failed (unable to rotate at all). Continue to circ.
and reciprocate pipe while preparing to trouble shoot rotary
failure
18:30 - 21 :00 2.50 DRILL N RREP PROD4 - Trouble shoot TD rotary failure (reciprocating and circulating
during this process).
- Pump; 330 gpm @ 2960 psi.
- Strg Wt.; Up 143K, Dn.90K
- Suspect rotary rheostat-replace same
21 :00 - 00:00 3.00 DRILL P PROD4 - Drlg f/11.006' t/11,390' (rotating & sliding)
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/7/2005 21 :00 - 00:00 3.00 DRILL P PROD4 - WOB; Sliding 2SK, Rot. 3K
- RPM 80
- Torque; On Btm. 7K, Off Btm. 6K
, - Pump; 330 gpml 92 stks.
- SSP; On Btm 3200 psi., Off Btm. 3000psi.
- Strg Wt.; Up 142K, Dn. 80K, Rot. 115K
- ECD; Calc. 10.76 Act. 10.79
1/8/2005 00:00 - 07:00 7.00 DRILL P PROD4 - Drlg. f/11 ,390' tJ 12,100' (rotating & sliding)
- WOB; Sliding 4K Rot. 5K
- RPM 80
- Torque; On Btm. 7,500 ftJlbs, Off Btm. 7,000 ftJlbs.
- Pump Rate 330 gpml 92 spm
- SSP; On Btm. 3,280 psi. Off Btm. 3,150 psi.
- Strg. Wt.; Up 150K, Dn.75K, Rot. 114K
- ECD; Calc. 10.68 Act. 10.85
- SPR #1 30 spm=720 psi.
40 spm=900 psi.
- SPR #2 30 spm=800 psi.
40 spm=900 psi.
07:00 - 09:00 2.00 I DRILL P PROD4 - Circ. Btms. Up x 2, until shaker returns were clean.
- Pump Rate; 330 gpm @ 3,200 psi.
09:00 - 14:00 5.00 I DRILL P PROD4 - Wiper Trip f/12, 1 00' tJ 6,040'
- Tight Spot @ 10,596', 20K overpull, wrk'd BHA through area,
no overpull after working area.
14:00 - 16:30 2.50 DRILL P PROD4 - Circ. Btms. Up x 2 @ 6,040'
- Pump Rate 330 gpm @ 2,250 psi.
16:30 - 00:00 7.50 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather
- Pump Rate 90 gpm @ 340 psi.
- Strg. Wt.; Up 115K, Dn. 105K, Rot. 111 K
- Reciprocating & Rotating Drill string periodically
1/9/2005 00:00 - 00:00 24.00 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather
- Pump Rate; 90 gpm @ 340 psi.
- Strg. Wt.; Up 115K, Dn.105K, Rot. 111 K
- Reciprocating & Rotating periodically
1/10/2005 00:00 - 00:00 24.00 DRILL N WAIT PROD4 - Circ. @ 6,040', Phase 3, Wait On Weather
- Pump Rate; 90 pgm @ 340 psi.
- Strg. Wt.; Up 115K, Dn. 105, Rot. 11 K
- Reciprocating & Rotating Dp pèriodically
1/11/2005 00:00 - 06:00 6.00 DRILL N WAIT PROD4 - Circ @ 6,040', Phase 3, Wait On Weather
- Pump Rate; 90 gpm @ 340 psi
- Strg. Wt.; Up 115K, Dn.10SK, Rot. 11K
- Reciprocate & Rotate periodically
06:00 - 18:00 12.00 DRILL N WAIT PROD4 - Phase 3 lifted to Phase 2
- Continue to Circ. @ 6,040'
- Mobilize equipment to clean pad & dig out all vac. trucks. 2
forklifts, 1 cat & service vehicles to start dead trucks
- Send Vac. trucks wI SFMOBM back to M-I plant for reheating
wI additions of new mud.
18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Circ. @ 6,040', 90 gpm 1340 psi.
- Clear and clean around rig & pad wi heavy equipment
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/11/2005 18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Clear all exits, walkways, stairs & steps of excess snow & ice
1/12/2005 00:00 - 00:30 0.50 DRILL P PROD4 - B/O TD & Blow Dn same. Change out first jt. (galled face on
tool jt)
00:30 - 02:30 2.00. DRILL P PROD4 - RIH wI 4" Dp & 6 3/4" Directional BHA tJ 9,293'
- Dn. Wt. 75K
02:30 - 03:30 1.00 DRILL P PROD4 - M/U TD, Fill Dp & Brk. Circ. (stage up pumps in 30 stk.
increments)
- Final Pump Rate; 325 gpm @ 2,760 psi.
- ECD Calc. 10.35, Act. 10.56
- B/O TD & Blow Dn. same
03:30 - 04:30 1.00 DRILL P PROD4 - RIH wi 4" Dp & 6 3/4" BHA tJ 12,100'
04:30 - 08:00 3.50 DRILL P PROD4 - M/U TD & Brk Circ.
- Pump Rate; ICP 330 gpm I 3,550 psi., FCP 330 gpm I 3,400
psi
- RPM 100
- Torque 8,000 ftJlbs
- Strg. Wt. Up 112K, Dn. 102K, Rot 108K
- ECD Calc. 10.80, Final Act. 10.89
- Pump 20 bbl. Low-Vis sweep followed by 20 bbl. Weighted
sweep
08:00 - 10:30 2.50 DRILL P PROD4 - PJSM
- Disp. Wellbore to SFMOBM @ 6 bpm I 2,370 psi.
10:30 - 13:00 , 2.50 DRILL IP PROD4 - Circ. tJ condition & balance mud in wellbore
- Pump Rate; 330 gpm 13,750 psi.
13:00 - 22:00 9.00 DRILL P PROD4 - PJSM
- POH wI 4" Dp, UD jts. wI bad hard band (Dp & HWDP)
- No significant overpull at window (6,120'-6,108')
- 84 jts 4" Dp & 8 jts. HWDP UD
22:00 - 00:00 2.00 DRILL P PROD4 - POH w/6 3/4" Directional BHA
- PJSM wI Schlumberger before POH wI Radioactive Source
- Clear floor of unnecessary personnel & remove source
i
I
1/13/2005 00:00 - 01 :00 1.00 DRILL P PROD4 - UD 6 3/4" Directional BHA
01 :00 - 02:00 1.00 CASE P PROD4 - Clear & Clean Rig Floor
02:00 - 02:30 0.50 CASE P PROD4 - Service Top Drive
02:30 - 05:00 2.50 CASE P PROD4 - P/U & M/U Whipstock Retrieving BHA
- Retrieval Hook, 1 jt. HWDP, Float Sub, MWD, Bumper Sub,
Oil Jar, XO, 24 jts. HWDP= 832.55'
- Shallow Test MWD @ 830'
- Pump Rate; 330 gpm 11000 psi. OK
05:00 - 08:00 3.00 CASE P PROD4 ,- RIH wI 4" Dp & Whipstock Retrieval BHA tl5,700'
- SLM Dp in derrick while RIH
- Fill Dp @ 3,200'
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/13/2005 08:00 - 09:30 1.50 CASE P PROD4 - PJSM
- Slip & Cut Drlg. Line
09:30 - 11 :00 1.50 CASE P PROD4 - RIH 116,090' wI Whpstck Ret'r BHA on 4" Dp
- Pump Rate; 250 gpm/1230 psi.
1- Strg. Wt; Up 130K, Dn. 102K
1- Orient'd Ret'r Hook, RIH 116113' & latched Whpstck.
.. Pulled 30,000# Overpull & let Jars bleed off
- Pull to 85,000# Overpull & released Anchor
· POH 45' to 6,075'
11 :00 - 11 :30 0.50 CASE P PROD4 - CBU @ 330 gpm/1 ,950 psi
· Pump Off- Monitor Well- Static
· B/O & BID Top Drive
11 :30· 14:30 3.00 CASE P PROD4 - POH wI 4" DP
14:30 - 17:00 2.50 CASE P PROD4 - B/O & UD Whpstck Retrieving BHA & Whipstock
- Whipstock showed mills came off @ 9 1/2' , rode high side fl
1 1/2'
17:00 - 17:30 0.50 CASE P PROD4 - Clear & Clean Rig Floor
17:30 - 23:00 5.50 CASE P PROD4 - PJSM
- Remove Wear Ring, Install Test Plug & R/U II test
· Test BOPE's 11250 psi low/3,500 psi high
- Test witnessed by AOGCC rep.
· RID Test Equip., Remove Test Plug & Install Wear Ring
23:00 - 00:00 1.00 P RUNPRD - PJSM
- R/U Liner running equip. & handling tools
1/14/2005 00:00 - 06:30 6.50 CASE P RUNPRD - Liner Running Procedure reviewed in PTSM
- RIH wI 141 jts. 4 1/2" 12.6 # L-80 IBT Slotted Liner, 1 jl. 4
1/2" 12.6 # L-80 IBT Solid Liner (Bent) Shoe Jt. wI Guide
Shoe, 1 jt. 4 1/2" 12.6# L-80 IBT Solid Liner under Hgr.
- Torque to preset make, Avg. M/U Torque 3,450 ftIlbs.
06:30 - 07:30 1.00 CASE P RUNPRD - C/O Elevators
- M/U Hook Hgr, P/U 1 std. Dp & M/U Top Drive
- Circ. 10 bbls through Hgr. @ 330 gpm 1275 psi.
- BIO TD & Blow Dn. Same
- Strg Wt. Up 100K, Dn.90K
07:30 - 17:30 10.00 CASE P RUNPRD - RIH w/4 1/2" Liner on 4" Dp
- Worked Centrilizers through window, Centrilizers hung up @
7,800', 8,470', 8,780'
- Encountered difficulty RIH wI Liner, (corresponding Shoe
Depth 10,300'). Beginning of Inverted section on Low
Permability Zone of OBa @ 10,290'.
- @ 11,604' began P/U single jts. Dp (1 x 1) & RIH, (giving
more flexability to work string). Continue to work pipe Dn. II
12,082'
- Did not latch HGR. Hook going through window @ 6,120'
- Strg Wt. Up 190K, Dn. 40K
17:30 - 18:30 1.00 CASE P RUNPRD - Reciprocate pipe f/12,065' 1112,082', (free up liner string prior
to attempting to hook Hgr).
- Final Strg. Wt. Up 180K, Dn.40K
- M/U TD & apply 1/4 turn to right. Work pipe & SIO to latch
Hgr. Hook @ 6,120'-successful
- P/U II 190K & brk. string free, unlatch Hgr. Hook
- SIO & relatch Hgr. Hook @ same mark, depth 6,120'.
- BIO TD & drop 1 3/4" Baker ball. MIU TD
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/14/2005 17:30 - 18:30 1.00 CASE P RUNPRD - Circ Ball Dn. @ 4 bpm/530 psi., reduce rate II 2 bpm last 10
bbls. Total string vol. to ball seat = 55 bbls.
- Seat ball & pressure up II 3,000 psi. (hold 5 min.)
- Bleed off pressure II 0 psi.
- P/U 30' to app. 6,090' to verify Running Tool released.
Continue to POH II 6,030'
18:30 - 19:30 1.00 CASE P RUNPRD i - CBU @ 6,030'
- Pump Rate; 355 gpm I 3,300 psi.
- Strg. Wt. Up 125K, Dn. 108K
- B/O TD & BID same
19:30 - 22:00 2.50 CASE P RUNPRD - POH wI 4" Dp & Liner Running Tool
122:00 - 22:30 0.50 CASE P RUNPRD - UD 4 1/2" Liner Running Tool
- Make all service brks. as per Baker Rep.
22:30 - 23:00 0.50 CASE P RUNPRD - Clear & Clean Rig Floor
23:00 - 23:30 0.50 TIEBAC P OTHCMP - PJSM
123:30 - 00:00 CONDH~P - R/U Liner Running Equip. & Handling Tools fl LEM # 2
0.50 OTHCMP - RIH wI LEM Assy. # 2
, - 41/2" Seal Assy. 1 jt. 4 1/2" 12.6 # L-80 IBT Solid Liner
1/15/2005 i 00:00 - 01 :00 1.00 TIEBAC i P OTHCMP - RIH wi LEM Assy. #2
I - P/U 3 ea. 4 1/2" 12.6# L-80 IBT Solid Liner jts., 3 ea. 4 1/2"
I 12.6# L-80 IBT Solid Liner Pup jts., 1 ea. Baker LEM Hgr., 1
I I
101:00 - 01:30 ea. Baker Seal Bore Assy.
0.50 TIEBAC P 10THCMP 1- PJSM
,- CIO Elevators
- Install False Bowl & R/U 2 7/8" handling tools
01 :30 - 02:00 0.50, TIEBAC P OTHCMP - Service Top Drive
02:00 - 05:00 3.00 TIEBAC P OTHCMP - P/U & RIH wi Circ. Nozzle Assy., 9 jts. 2 7/8" 7.7# Inner
Wash String & 2 718" Pack-Off Assy.
- Total Length = 281.11'
- CIO Elevators
- P/U & M/U Baker 5 1/2" x 75/8" ZXP L TP
05:00 - 05:30 0.50 TIEBAC P OTHCMP - RID 2 7/8" Handling Tools
05:30 - 12:30 7.00 TIEBAC P OTHCMP - PJSM
- RI H wi LEM #2 on 4" DP II 6,103' (top of Liner Hook Hgr)
12:30 - 15:00 2.501 TIEBAC P OTHCMP - MIU TD & Brk Circ. @ 3 bpml 570 psi.
- Strg. Wt. Up 132K. Dn 111K
- Attempted to run LEM Assy. through Hgr. LEM window, wlo
success, stacked out @ 6,122'.
- P/U 20', turned string in increments of 1; 1/2; 1/4; 1/8 turns
attempting to RIH, wlo success, string stacked out @ 6,122'.
Continued to attempt to run through LEM window with &
without pumps wlo success. Rotate string @ 5 rpm (strg.
torque 4K Wlbs) while slacking off through window area wlo
success, stacked out @ 6,122'
- BID Top Drive
15:00 - 17:30 2.50 TIEBAC N DPRB OTHCMP - POH wi 4" DP & LEM #2
17:30 - 18:00 0.50 TIEBAC N DPRB OTHCMP - PJSM
- RIU False Bowl & 2 7/8" Handling Tools
18:00 - 20:00 2.00 TIEBAC N DPRB OTHCMP ,- UD ZXP L TP & 2 7/8" Pack-off Assy.
- CIO Elevators
- POH 2 7/8" Inner string (stand back in derrick)
- UD 2 7/8" Circ. Nozzle Shoe Assy.
Printed: 2/7/2005 9:37:45 AM
- No abnormal wear or marks on 2 7/8" Circ. Nozzle Shoe
- CIO Elevators
- RID 2 7/8" Equip. & Handling Tools
'- R/U 41/2" Equip. & Handling Tools
- POH wI Seal Bore Assy., LEM Hook Hgr., Solid Liner, Seal
Assy.
- 4 1/2" Mule Shoe lightly scarred in 6 different places around
outside perimeter of shoe. Suspect contact wi Collet Profile of
Liner Hook Hgr.
- RIH w/4 1/2" Bent Seal Assy. JI. (bend 9' from shoe wI 6"
off-set), 4 ea. 4 1/2" solid liner jts., 3 ea. 4 1/2" solid liner pup
jts., LEM Hook Hgr, Seal Bore Assy.
- C/O Elevators
- RID 41/2" Equip. & Handling Tools
- R/U 27/8" Equip. & Handling Tools
- RIH w/2 7/8" Circ. Nozzle Assy. jl., 8 ea. 27/8" Tbg. jts., 5
ea. 27/8" Tbg. Pup jts., Pack-Off Assy. (total length = 279.21 ')
- 2 7/8" Circ. Nozzle located 1.97' outside btm. of 4 1/2" Seal
Assy. Mule Shoe
DPRB OTHCMP - C/O Elevators
- P/U & M/U ZXP LTP to 2 7/8" Inner String & 41/2" Outer
String
- M/U TD & Brk. Circ. @ 4 bpml 350 psi.
- LEM Assy. Strg WI. Up 45K, Dn. 50K
. DPRB OTHCMP - Service Top Drive
DPRB OTHCMP - RIH wI LEM #2 on 4" Dp 116,055'
- Strg. WI. Up 133K, Dn. 11 OK
DPRB OTHCMP - RIH 116,103', Tag'd Up on Top of Hook Hgr. Rotated string 1
turn & attempted to RIH wI LEM Assy. Through Liner Hook
Hgr. LEM Window, Stacked Out @ 6,122'. M/U TD & brk. circ.,
3 bpm/500 psi. Turned string in increments of 1; 1/2; 1/4; 1/8;
turns attempting to exit LEM window wlo success. Continued
to stack out @ 6,122'. Continued to attempt to exit LEM
window. Occasionally the Mule Shoe Stacked Out @ 6,117',
this depth corresponds with end of Hook Hgr. LEM Window.
Continued to attempt to exit window using alternating braking
actions & different running speeds wlo success. Rotated string
at 5, 10, 20 rpm, Torque 4,500 ftIlbs while slacking off wlo
success.
DPRB OTHCMP - BID TO
- POH wI LEM #2 on 4" Dp
- SLM on trip out-no change in DP measurment
DPRB OTHCMP - PJSM
- B/O & UD ZXP L TP
- POH w/2 7/8" Inner Wash String & stand back in derrick
- Inspect & UD Circ. Nozzle Shoe Assy.
- NO new addtional scarring or marks on Nozzle Shoe
DPRB OTHCMP - POH & UD Seal Bore Assy., LEM, 3 ea. 4 1/2" Solid Liner
pup jts. 3ea. 4 1/2" Solid Liner jts.
- POH w/1 jl. liner & Bent JI. Seal Assy.
- 41/2" Mule Shoe had severe scarring from btm. of shoe up
through first set of seals. Remove damaged mule shoe and
seals fl bent jl. & replaced them with shoe and seals from the
I
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
1/15/2005 18:00 - 20:00 2.00 TIEBAC N DPRB OTHCMP
20:00 - 20:30 0.50 TIEBAC N DPRB OTHCMP
20:30 - 21 :30 1.00 TIEBAC N DPRB ' OTHCMP
I
I
21 :30 - 22:30 1.00 TIEBAC iN DPRB OTHCMP
I
22:30 - 23:00 0.50 TIEBAC N DPRB OTHCMP
23:00 - 00:00 1.00 I TIEBAC N DPRB OTHCMP
1/16/2005
00:00 - 00:30
0.50 TIEBAC N
00:30 - 01 :00
01 :00 - 06:30
0.50 TIEBAC N
5.50 TIEBAC N
06:30 - 12:00
5.50 TIEBAC N
12:00 - 15:00
3.00 TIEBAC N
15:00 - 16:00
1.00 TIEBAC N
16:00 - 17:00
1.00 TIEBAC N
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
Printed: 2m2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
16:00 - 17:00
17:00 - 17:30
0.50 TIESAC N
17:30 - 18:30
1.00 TI EBAC N
18:30 - 20:00
1.50 TIEBAC N
1/17/2005
20:00 - 00:00
00:00 - 00:30
4.00 TIEBAC N
0.50 TIESAC N
00:30 - 03:00
2.50 TIESAC IN
I
I
03:00 - 04:00 1.00 TIESAC N
04:00 - 08:00 4.00 TIESAC N
08:00 - 10:00 2.00 TIESAC N
10:00 - 11 :30 1.50 TIESAC N
11 :30 - 16:30 5.00 TIESAC N
16:30 - 17:30 1.00 TIESAC N
17:30 - 21 :30 4.00' TIESAC N
21 :30 - 00:00 2.50 TIESAC N
DPRS OTHCMP
DPRB OTHCMP
I DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
orginal seal assy. jt which was not damaged during the first
attempt to land LEM #2.
- Clear & Clean Rig Floor
- Remove Master bushings and vacum out old MOBM from drip
pan area.
- RIH w/4 1/2" Bent Jt. wI reconditioned mule shoe and seals
installed. 4ea.4 1/2" Solid jts., 3 ea. 4 1/2" Pup jts., LEM &
new Seal Bore Assy wlo swivel
- RIH w/2 7/8" Tbg. Inner string (total length = 275.16')
- 2 7/8" Nozzle Shoe protruding .84' beyond btm. of 41/2" Mule
Shoe
- P/U ZXP L TP & M/U to 2 7/8" inner string & to 5 1/2" Seal
Bore Assy.
- RIH wi LEM #2 on 4" Dp II 5,225'
- RIH wi LEM #2 on 4" Dp II 6,056'
- Strg Wt. Up 132K, Dn. 11 OK
DPRB OTHCMP - RIH II 6,097', Tag'd Top of Liner Hgr. Rotated 1/4 turn &
continued in hole to 6,117'. P/U above Liner Hgr. Top @ 6,097'
& apply 1/4 turn in string and attempt to exit Liner Hook Hgr.
LEM Window wlo success. Continue to work pipe and apply
1/4 turn increments for each P/U & S/O cycle for 2 full
revolutions attempting to exit window wlo success. Still
stacking out @ 6,117'. String hanging up @ 6,112 and then
breaking loose when 5K Dn. Wt. applied. Suspect mule shoe
oriented towards window, (btm. of Liner Hook Hgr. LEM exit
window @ 6,111'), but still unable to exit. Apply alternating
braking action while slacking off trying to bounce mule shoe
out window wlo success. Circ. @ 3 bpml 500 psi wI no effect.
,DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
'DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
- CBU @ 5 bpml 920 psi
- Monitor Well, Static
- Blow Dn Top Drive
- POH wi LEM #2 assembly on 4" DP.
- Change elevators and rack back 3 stds 2 7/8" inner string.
- LD 41/2" tubing fl LEM #2. Inspect seal assembly - no
obvious signs of scoring or other damage. All seals intact.
- Discuss options wI Anchorage and agree way forward. Wait
on additional tools to be delivered to site from Baker. Cleaning
& general housekeeping while waiting.
- RIH w/2 7/8" Tbg fl derrick and POH & UD same
- P/U Baker "HR" Liner Running Tool Assy. & RIH on 4" Dp II
6,075'
- Establish Working Parameters
- Strg. Wt; Up 132K, Dn 120K, Rot. 130K
- Rotary; 10 RPM @ 4,500 ftllbs Torque
- RIH II 6,097', Tagged Top of Liner Hook Hgr. Continued to
RIH & btm'd out in "HR" profile of the Liner Hook Hgr. @ 6,116'
- P/U 10' to verify Running tool engaged. S/O & stack 20,000#
Dn. to verify Running Tool was seated in profile area.
- S/O trying to break string free down, no success
I
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/17/2005 21 :30 - 00:00 2.50 TIEBAC N DPRB OTHCMP - P/U in 25,000# increments working pipe in attempt to free
liner. @ 300,000# liner came free. Work pipe fl 6,107' tJ
6,129' ("HR" Running Tool Depth) until constant hook loads
were established @ Up Wt. 185K & Dn. Wt. 70K.
- @ 6105' apply 1 1/2 turn, S/O and attemp to hang Liner Hook
Hgr. wlo success. Repeated attempts were made w/1 , 3/4,
1/2, 1/4 turns being applied at different intervals while working
string fl 6,107' tJ 6,129', wlo success. These depth
settings were established to keep the top of the Liner Hook
Hgr. inside the window @ 6,108' while the "HR" Profile of the
Liner Hook Hgr. was outside the window app. 9/10' @ 6,129'.
- Install 6 turns in string and trap torque of 4,500 ftJlbs. Work
pipe through window area. No change in trapped torque.
- Suspect dogs on "HR" Running Tool not engaging properly in
order to turn Hook Hgr.
- PIU 1/5,990' & rotate string @ 10 rpm wi 6,500 fUbs. torque.
Torque being steady @ 6,500 ftJlbs verifies that tool is turning,
not the liner Hook Hgr. & 4 1/2" Slotted Liner
1 118/2005 00:00 - 02:00 2.00 TIEBAC N DPRB OTHCMP - Work Drlg. String fl 6,107' tJ 6,129' attempting to hang Liner
Hook Hgr. @ btm. of widow @ 6'120'. Rotating Dp. in 1/4 turn
increments to change location of hook assy. in attempts to find
window., wlo success.
- Continue to work string while communicating wi Anc. personal
on plan forward.
- Decision was made to POH wI Hook Hgr. Assy. & 41/2
"Slotted Liner
02:00 - 06:00 4.00 TIEBAC N DPRB OTHCMP - POH wI Liner Hook Hgr. & 4 1/2" Slotted Liner
06:00 - 07:00 1.00 TIEBAC N DPRB OTHCMP I Lay down hook hanger assembly.
07:00 - 08:30 1.50 TIEBAC iN DPRB OTHCMP Clean rig floor. Service rig and TDS.
08:30 - 11 :00 2.50 TIEBAC N DPRB OTHCMP Discuss plan forward with Anchorage team. Rig up to lay down
4.5" liner.
11 :00 - 19:00 8.00 TIEBAC N DPRB OTHCMP Pull and lay down 4.5" liner. Salvage usable centralizers. 25
centralizers damaged beyond future use.
19:00 - 20:00 1.00 TIEBAC N DPRB OTHCMP Rig down 4.5" liner equipment. Clear and clean rig floor.
20:00 - 21 :00 1.00 TIEBAC N DPRB OTHCMP Pick up mill assembly.
21 :00 - 23:00 2.00 TIEBAC N DPRB OTHCMP RIH with milling assembly. Tag no-go at 6,348'.
23:00 - 00:00 1.00 TIEBAC N DPRB OTHCMP Pull up to 6,113' and attempt to orient to window. Up Wt=125K
Dn Wt=102K
1/19/2005 00:00 - 03:30 3.50 TIEBAC N DPRB OTHCMP Continue attempting to pass through window. Tried slow
rotating while lowering pipe, cease rotation and advancing
orientation by 1/4 turns and advancing orientation by 1/8 turns.
No success.
03:30 - 06:00 2.50 TIEBAC N DPRB OTHCMP POH with mill assembly to change BHA configuration.
06:00 - 07:00 1.00 TIEBAC N DPRB OTHCMP Break out & LD BHA #24 components.
07:00 - 07:30 0.50 TIEBAC N DPRB OTHCMP Service top drive.
07:30 - 10:00 2.50 TIEBAC N DPRB OTHCMP PU components for BHA #25. Bullnose, 4" pup it, 4" bent it, 2
jts 4" DP, MWD, 9 its 4",2 ea string mills 6.75" OD, 1 jt 4"
HWDP, jars, also 5 associated crossovers. Orient bent jt with
MWD.
10:00 - 11 :00 1.00 TIEBAC N DPRB OTHCMP RIH & shallow test MWD.
11 :00 - 13:30 2.50 TIEBAC N DPRB OTHCMP RIH to window depth at 6108'.
13:30 - 14:30 1.00 TIEBAC N DPRB OTHCMP Orient 15L with MWD. RIH & tag up on L 1 liner top. POH above
Printed: 2n/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/19/2005 13:30 - 14:30 1.00 TIEBAC N DPRB OTHCMP window and make 2 attempts RIH & POH with slow pipe
rotation, trying to find window with a torque increase· no
success.
Orient bent joint @ 13R and go thru window into open hole.
14:30 - 15:30 1.001 TIEBAC N DPRB OTHCMP Work mills up & down thru window from 6102' to 6140' x5.
I Didn't see any indications that mills were doing any work
downhole from torque or rotary indications. Make one pass
without rotating and one pass without rotary or pump - no
problems.
15:30 - 16:30 1.00 TIEBAC N DPRB OTHCMP Pull into shoe and circulate bottoms up. Inspect derrick for ice
or other hazards.
16:30 - 19:00 2.50' TIEBAC N DPRB OTHCMP Monitor well. Blow down TDS. POOH to BHA.
19:00 - 21 :00 ' 2.00 TIEBAC N DPRB OTHCMP Lay down Milling assemby and MWD (BHA # 25).
21 :00 - 21 :30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor.
21 :30 - 00:00 2.50 TIEBAC N IDPRB OTHCMP PJSM. Rig up and run 4.5" liner as per running detail to 1246'
1/20/2005 00:00 - 04:30 4.50 TIEBAC N ,DPRB OTHCMP Continue to RIH with 4.5" liner as per detailed running
procedure.
04:30 - 05:30 1.00 TIEBAC N DPRB OTHCMP Chg elevators. PU liner hook hanger and running tool. Upwt
95K Dn wt 87K.
05:30 - 06:30 1.00 TIEBAC N DPRB OTHCMP Run 4.5" liner on Drill Pipe down to window. 100k up. 90k
down.
06:30 - 07:00 0.50 TIEBAC N DPRB OTHCMP Position shoe at mid point of window. Rotate 3 turns to right.
Exit window on first attempt.
07:00 - 13:30 6.50 TIEBAC N DPRB OTHCMP Run slotted liner in open hole. Clean to 10420'. From here to
TD, took weight in multiple spots but able to PU and work thru
each time. Acted as if centralisers or couplings were hanging
up in the window.
13:30 - 14:15 0.75 TIEBAC N DPRB OTHCMP PU last single of DP. Work pipe & improve PU & SO wts. PU
18' above hook point. Put in 3/4 turn - no success. 1/2 turn. No
success. 1/4 turn - no success. Run deeper past calculated
hook point and get hanger hooked 15' deeper than calculated.
14:15 - 15:45 1.50 TI EBAC N DPRB OTHCMP Unhook & hook hanger at same depth x3. Rotate 1/4 turn and
run past hook point. Rotate back 1/4 turn and hook x3.
Unhook and rotate 1/2 turn. RIH - no hook.
PU & rotate another 1/2 turn. RIH & land hook at same depth.
Account for depth discrepancy in tally & verify hook depth is
correct· OK.
15:45 - 16:30 0.75 TIEBAC N DPRB OTHCMP Load ball in drill pipe and pump down on seat. Pressure up to
2000 psi. PU &verify released from liner - OK. Continue
pressuring up and shear ball seat at 3600 psi. Run back in and
verify hanger is at same depth.
16:30 - 17:30 1.00 TIEBAC N DPRB OTHCMP POOH standing back Drill Collars to 5424'.
17:30 - 18:30 1.00 TIEBAC N DPRB 10THCMP PJSM. Slip and cut drill line.
18:30 - 21:30 3.00 TIEBAC N DPRB 10THCMP POOH (SLM). Lay down hanger running tool. Clear and clean
rig floor.
21 :30 - 23:30 2.00 TIEBAC N DPRB OTHCMP PJSM. Rig up and pick up LEM #2
23:30 - 00:00 0.50 TIEBAC N DPRB OTHCMP Change out handling equipment and pick up & run inner string.
1/21/2005 00:00 - 02:30 2.50 TIEBAC N DPRB OTHCMP Pick up and run inner string inside LEM assembly.
02:30 - 03:00 0.50 TIEBAC N SFAL OTHCMP While making up first stand of drill pipe onto LEM assembly, a
1/2" bolt, 2-1/4" long with a 3/4" head broke off of the iron
roughneck and fell past the slips into the hole. Drained the
stack and looked for the bolt without success.
03:00 - 05:00 2.00 TIEBAC N SFAL OTHCMP Gather the rig team, fisherman, LEM tech and ANC staff to
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/21/2005 03:00 - 05:00 2.00 TIESAC N SFAL 10THCMP . discuss options with all parties.
05:00 - 06:00 1.00 TIESAC N SFAL OTHCMP I Salt is now visible sitting in annular space between 75/8"
casing and the liner top packer - laying sideways on tapered
I bore at top of wear ring. Call for magnet 1.75" OD. Will attempt
I to fish bolt out with this. Change plan as 1.75" magnet will be
I too big to go down to bolt.
06:00 - 09:30 3.50 TIESAC N SFAL OTHCMP I Use thin magnet from rig and attempt to retrieve bolt. Make
I I several unsuccessful attempts. Change to mechanics magnet -
i stronger. Run in and retrieve bolt which appeared to be almost
I brand new.
09:30 - 16:00 6.50 TIESAC N DPRS OTHCMP I RIH with LEM package on drill pipe
16:00 - 17:30 1.50 TIEBAC N DPRB OTHCMP . Land LEM on hanger while circulating through workstring when
seal assembly is entering SBR. Pick up 15K over to verify
LEM is latched into hook hanger.
17:30 - 18:30 1.00 TIESAC P OTHCMP Drop ball and pump down to seat. Pressure up to 3200 psi to
i set ZXP packer and hold pressure for 5 minutes. Increase
I pressure to 4150 psi to release running tool. Bleed pressure to
o psi. Close annular preventer and pressure test packer to
1500 psi for 10 minutes, good test. Pressure up drill pipe to
500 psi and pick up to observe pressure drop to 0 psi, OK.
18:30 - 22:30 4.00 TIEBAC P OTHCMP POOH with LEM running tools and inner string.
22:30 - 00:00 1.50 TIESAC P OTHCMP Lay down running tools and inner string.
1/22/2005 00:00 - 01 :00 1.00 TIESAC P OTHCMP Continue laying down LEM running equipment.
01 :00 - 02:00 1.00 TIEBAC P OTHCMP Rig down tubing equipment. Clean rig floor.
02:00 - 06:30 4.50 STWHIP P WEXIT PJSM. Pick up Whipstock assembly, MWD, drill collars and
HWDP. Shallow test MWD.
06:30 - 10:30 4.00 STWHIP P WEXIT RIH with whipstock assembly, orient whipstock to 17L and set
seals at 6063'. Set bottom anchor and shear off mills. 132K
Up Wt. 107K Dn Wt.
10:30 - 12:15 1.75 STWHIP P WEXIT Displace SFOSM with warm (100 degrees) MOSM at 84 SPM,
1850 psi. Capture returned SFOBM into vac trucks for return
to mud plant.
12:15 - 12:30 0.25 STWHIP P WEXIT i Begin milling window. TOW at 5986'.
12:30 - 13:30 1.00 STWHIP P WEXIT Service rig and TDS.
13:30 - 15:30 2.00 STWHIP N RREP WEXIT Problem with TDS brake. Troubleshoot and repair.
15:30 - 20:30 5.00 STWHIP P WEXIT Resume milling operations. Mill window and 33' of formation to
6018'.
TOW = 5986'
SOW = 5998'
20:30 - 22:30 I 2.00 STWHIP P WEXIT Circulate bottoms up and pump a hi vis sweep around.
Note-75 Ibs metal captured at surface during milling and
circulating operations.
22:30 - 00:00 1.50 STWHIP P WEXIT POOH from 6018' to 5702'.
1/23/2005 00:00 - 02:00 2.00 STWHIP P WEXIT POOH from 5702' to BHA.
02:00 - 04:30 2.50 STWHIP P WEXIT Stand back HWDP and DC. Lay down milling SHA.
04:30 - 05:00 0.50 STWHIP P WEXIT Clean and clear rig floor.
05:00 - 06:30 1.50 BOPSUF P WEXIT Function and flush BOP stack.
06:30 - 08:30 2.00 STWHIP P WEXIT Pick up 6.75" drilling BHA.
08:30 - 09:30 1.00 STWHIP N RREP WEXIT Repair air valve on top drive.
09:30 - 10:30 1.00 STWHIP,P WEXIT Continue PU SHA #27. PJSM & load nuclear source.
10:30 - 14:30 4.00 STWHIP P WEXIT RIH picking up singles drill pipe from shed.
I
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/23/2005 14:30 - 15:00 0.50 STWHIP P WEXIT Shallow test MWD.
15:00 - 19:00 4.00 STWHIP P WEXIT RIH to above top of window at 5958'.
19:00 - 20:00 1.00 STWHIPP WEXIT Circulate to establish basline ECD. Orient BHA and pass
through window.
20:00 - 00:00 4.00 DRILL P PROD5 Directional drill 6.75" hole from 6018' to 6250'. PU wt 120K.
SO Wt 105K. TVD 5137'.
1/24/2005 00:00 - 12:00 12.00 DRILL P PROD5 Directional drill 6.75" hole from 6250' to 7013'. UP wt 121K.
Dn wt 92K. Rt wt 105K. TO on 5K. TO off 5K. ROT 80.
WOB 2K. 332 GPM. 2750 psi. AST 5.28. ART .7.
12:00 - 00:00 12.00, DRILL P PROD5 Directional drill 6.75" hole from 7013' to 7974'. UP wt 118K.
Dn wt 93K. Rt wt 100K. TO on 5-6K. TO off 5-6K. ROT 80.
WOB 4K. 332 GPM. 2750 psi. AST 3.6. ART 3.16.
Calculated ECD = 10.00 to 10.10
Actual ECD = 10.4 to 10.52
1/25/2005 00:00 - 08:30 8.50 DRILL P PROD5 Directional drill 6.75" hole from 7974' to 8874'.
08:30 - 09:00 0.50 i DRILL P PROD5 : Circulate sweep around.
09:00 - 12:00 3.00 I DRILL P PROD5 Directional drill 6.75" hole from 8874' to 9030'. UP wt 123K.
Dn wt 88K. Rt wt 105K. TO on 7K. TO off 6K. ROT 80.
WOB 5K. 332 GPM. 3000 psi. AST .73. ART 3.27.
12:00 - 00:00 12.00 DRILL P PROD5 Directional drill 6.75" hole from 9030' to 10,056'. UP wt 133K.
Dn wt 91K. Rt wt 107K. TO on 7K. TO off 6K. ROT 80.
WOB 5K. 310 GPM. 3240 psi. AST 1.72. ART 3.31.
Calculated ECD = 10.48
Actual ECD = 10.89
1/26/2005 00:00 - 12:00 12.00 DRILL P PROD5 Continue drilling 6.75" hole 10,056' to 10,765' MD.
138 klbs up. 84 klbs down. 110 klbs rot.
Torque: On btm 8 kit Ibs. Off btm 7 kit Ibs.
330 gpm @ 3380 psi.
12:00 - 00:00 12.00 DRILL P PROD5 Continue drilling 6.75" hole from 1 0,765' MD to 11,592'.
145 klbs up. 78 klbs down. 110 klbs rot.
Torque: On btm 8-9 kit Ibs. Off btm 7-8 kit Ibs.
330 gpm @ 3460 psi.
Total for day - AST = 5.37 ART = 2.66
Calculated ECD = 10.61
Actual ECD = 10.80
1/27/2005 00:00 - 03:30 3.50 DRILL P PROD5 Continue drilling 6.75" hole from 11,592' to 11 ,943'. ECD at
hardline.
03:30 - 04:00 0.50 DRILL P PROD5 CBU and sweep to clean hole and lower ECD
04:00 - 05:00 1.00 DRILL P PROD5 Continue drilling 6.75" hole from 11,943' to 12054'. Have
difficulty sliding due to excessive drag. Decision made to TD
hole at this point.
AST = 1.15 ART = .75
05:00 - 08:00 3.00 DRILL P PROD5 Circulate and condition hole for short trip.
08:00 - 20:30 12.50 DRILL P PROD5 POOH backreaming from 12,054' to 6798'. Tight spot at
10,867'. Worked through, cleaned up.
20:30 - 23:00 2.50 DRILL P PROD5 POOH I MAD pass from 6798' to 6084'. 80 rpm, 70spm, 250
PROD5 gpm, 1900 psi. Pull up above window.
23:00 - 23:30 0.50 DRILL P Make up and set RTTS at 50'.
I
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/27/2005 23:30 - 00:00 0.50 DRILL P PROD5 Pull wear bushing. Set test plug. Rig up and test BOPE.
Witness of test waived by AOGCC Rep Jeff Jones.
1/28/2005 00:00 - 08:00 8.00 ¡ CASE P PROD5 Continue test BOPE's tJ 250 psi lowl 3,500 psi high. Witness
I of test waived by AOGCC Rep., Jeff Jones. Choke line HCR
I I valve failed test. Top drive upper IBOP failed test.
08:00 - 00:00 16.00 CASE N RREP i PROD5 ! Replace choke line HCR - OK. Replace failed upper IBOP.
When making up, the box of the new one swelled. Remove
same and re-build previous one.
1/29/2005 00:00 - 03:00 3.00 CASE N RREP PROD5 Continue repairs to IBOP. Complete & test same to 250/3500
03:00 - 04:30 I I psi -OK.
1.50 CASE P PROD5 Run in and retrieve storm packer and drillstring. Well static. LD
I RTTS.
04:30 - 09:30 5.00 CASE Ip PROD5 RIH to bottom - hole in good condition. Saw slight bobble at
I 10867' but went straight on thru.
09:30 - 12:00 2.50 CASE P PROD5 Break circ & stage pumps up to 290 gpm. Pump 20 bbllow vis
sweep followed by 20 bbl weighted sweep surf to surf. 285 gpm
I @ 3280 psi. 80 rpm.
12:00 - 14:00 2.00 CASE P PROD5 Displace well to 9.2 ppg solids free MOBM. 285 gpm @ 3200
psi. 80 rpm. CBU X2 to condition & warm mud.
14:00 - 18:30 4.50 CASE P PROD5 Monitor well. Static. POH to window racking back DP. Hole in
good condition - no tight spots.
18:30 - 21 :00 2.50 CASE P PROD5 Cont POH LDDP to 3800'.
21 :00 - 22:00 1.00 CASE P PROD5 Service top drive & replace bolts on grabber.
22:00 - 00:00 2.00 CASE P PROD5 Continue POH to 2700' LDDP.
1/30/2005 00:00 - 03:15 3.25 CASE P PROD5 Continue POH LDDP.
03:15 - 03:30 0.25 CASE P PROD5 PJSM for removing source from LWD tool.
03:30 - 06:30 3.00 CASE P PROD5 Remove RA source. LD BHA #27. Clear & clean rig floor.
06:30 - 08:00 1.50 WHIP P RUNPRD MU whipstock retrieval BHA. Orient and test MWD - OK.
08:00 - 11 :00 3.00 WHIP P RUNPRD RIH on 4" DP to recover whipstock.
11 :00 - 12:00 1.00 WHIP P RUNPRD Break circ & stage up to 300 gpm @ 1720 psi - 125k up, 102k
down.
Orient hook to 17L and engage hook into whipstock.
Verify engaged. Pull 50 klbs over & let jars bleed off. Increase
to 80 klbs over & release anchor - OK.
12:00 - 13:00 1.00 WHIP P RUNPRD CBU X2 - 300 gpm @ 1750 psi.
, Monitor well - static. Blow dn top drive.
13:00 - 16:00 3.00 WHIP P RUNPRD POH with whipstock. Rack back DP & HWDP.
16:00 - 18:30 2.50 WHIP P RUNPRD I LD all whipstock retrieving tools & MWD. LD whipstock.
18:30 - 19:30 1.00 WHIP P RUNPRD I Clear floor & clean drip pan under rotary table.
19:30 - 20:00 0.50 CASE P RUNPRD RU to run 4.5" liner
20:00 - 20:30 0.50 CASE P RUNPRD PJSM BPX, Doyon, Doyon Casing, MI. Run 4.5" liner.
20:30 - 00:00 3.50 CASE P RUNPRD Run 4.5" 12.6# L-80 IBTslotted liner. -80 jts in @ midnight.
1/31/2005 00:00 - 03:00 3.00 CASE P RUNPRD Continue running 4.5" slotted liner for L3 lateral. 127 jts slotted,
Ip swell packer, 9 solid, swell packer, 2 solid, hook hanger.
03:00 - 04:45 1.75 CASE RUNPRD MU hanger to 4" DP. Run in 1 std + 60' to middle of window.
I Rotate 3 turns & RIH. Tag previous liner top.
Pull out above window and apply 1/4 turn.
Run in and tag liner top again. Repeat and on 5th 1/4 turn
applied, exited window successfully.
04:45 - 12:30 7.75 CASE P RUNPRD Run liner into open hole on 4" DP to 11,735'. Saw no problems
when running liner in open hole.
12:30 - 13:00 0.50 CASE P RUNPRD Get weights - 185 klbs up. 85 klbs dn.
MU TD. RIH past hook point to 11812'.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
Spud Date: 12/29/2000
End: 2/3/2005
11/19/2004
2/3/2005
9ES
1/31/2005 12:30 - 13:00 0.50 CASE P RUNPRD PU 20' and apply 1/4 turn @ surface.
Run in and engage hook hanger to put shoe at 11,804'.
PU & apply 1/2 turn. Run past hook depth.
. PU & apply another 1/2 turn. RIH & engage hook. Repeat x 2.
Hanger is hooked on depth.
13:00 - 13:30 0.50 CASE P RUNPRD Drop setting ball & pump on seat - 4 bpm @ 650 psi.
I 1.00/ CASE Pressure up to 3500 psi & release from liner.
PU & verify off liner, PI U Weight 132klbs - OK. PU 50'.
13:30 - 14:30 I P RUNPRD CBU x 2 above liner - 7 bpm @ 1,480 psi.
Monitor well. Run in & tag liner on depth.
Blow down top drive.
14:30 - 16:00 1.50 CASE P RUNPRD PJSM. Slip & cut drilling line. Service top drive.
16:00 - 19:00 3.00 CASE P RUNPRD POH with hook hanger running tool.
19:00 - 19:30 0.50 CASE P RUNPRD LD liner running tool.
19:30 - 20:00 0.50 CASE P RUNPRD Clear floor & clean under rotary table.
20:00 - 20:45 0.75 CASE ip TIEB3 RU to run 4.5" LEM assembly #3.
20:45 - 21 :00 0.25 CASE P TIEB3 PJSM for running LEM.
21 :00 - 23:00 2.00 CASE P TIEB3 MU LEM assembly #3 With inner string & setting tool on 1 std
DP.
23:00 - 23:30 0.50 CASE Ip TIEB3 Remove Anadrill pressure sensor from standpipe and plug
I outlet.
23:30 - 00:00 0.50 CASE P TIEB3 RIH with LEM assembly on 4" DP.
2/1/2005 00:00 - 04:00 4.00 CASE P TIEB3 RIH wI LEM Assembly #3 on 4" DP to 5,980'. Established
Parameters: String Weight Up 135,000#, String Weight Down
122,000#.
04:00 - 05:00
1.00 CASE P
I
I
1.001 CASE P
TIEB3
05:00 - 06:00
TIEB3
06:00 - 06:30 0.50 CASE P TIEB3
06:30 - 10:00 3.50 CASE P TIEB3
10:00 - 10:30 0.50 CASE P TIEB3
10:30 - 14:30 4.00 CASE P TIEB3
M I U Top Drive, Washed Down Through Top of Hook Hanger.
Continued to Wash Down into PBR on L2 LEM. Tagged Up 8'
High on First 2 Attempts, Applied 1/4 Turn x 2 and Landed
LEM Assembly. PI U wi 15,000# Overpull to Verify LEM Collet
in Place.
Dropped Setting Ball and Pumped onto Seat; ICR 4 bpm, 500
psi, FCR 1bpm, 50 psi. Pressured Up to 4,000 psi to Release
Running Tool and Set ZXP Liner Top Packer, Observed Good
Indication on Surface of Packer Setting. Closed Upper Pipe
Rams and Tested 7-5/8" and ZXP Packer to 1,500 psi f/15
Minutes, OK. Bled Down Pressure, Opened Rams.
POOH wi 3 Stands to 5,840'.
Circulated to Condition Mud, Pump Rate 3 bpm, 500 psi.
Waited on Brine Trucks.
Held PJSM wI MI - Rig Crew - Truck Drivers - Tool Pusher -
Drilling Supervisor.
Displaced Well bore to 9.3 ppg Brine; Pumped 25 bbls LVT
from Pit #4, Shut Down to Clean Pit #4, Pumped 25 bbls 9.3
ppg Viscosified Brine - 50 bbls 9.3 ppg Brine w/1% Safe-Surf-
50 bbls 9.3 ppg Viscosified Brine - 300 bbls Clean 9.3 ppg
Brine, Staged Up Pumps at the Following Rates:
3.5 bpm 600 psi
5.0 bpm 750 psi
6.0bpm 1,100 psi
Over Displaced By 50 bbls to Ensure Clean Well bore Fluid.
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
2/2/2005
10:30 - 14:30
14:30 - 15:00
15:00 - 16:00
16:00 - 23:30
23:30 - 00:00
00:00 - 02:00
02:00 - 02:30
02:30 - 04:00
04:00 - 06:00
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
4.00 CASE
0.50 CASE
1.00 CASE
7.50 CASE
0.50 CASE
2.00 CASE
0.50 CASE
Monitored Well, Static. Blew Down Top Drive.
Serviced Rig
Repaired Top Drive
POOH, LID 4" HWDP, 4-3/4" DC, 4" DP.
RIH wI excess Dp in derrick
POOH & LI D DP
Clear'd & Clean'd Rig Floor
Pull'd Wear Bushing
RUNCMP PJSM
R I U I-Wire Spooler, Overhead Sheaves, Tbg. Tongs & Hand
Tools
RUNCMP PJSM
M I U 4-1/2" Tail Pipe: 4-1/2" Mule Shoe Assy wI 5.60" OD
No-Go Locator - Lwr X Nipple Assy - Upper X Nipple Assy wI
RHC-M Sleeve - 1 Jt 4-1/2" Tubing - 4-1/2" x 7 5/8" Premier
Pkr - 7-5/8" Phoenix Jet Pump Gauge Assy - 4-1/2" Sliding
Sleeve 7" Phoenix Discharge Pressure Gauge Assy. M I U and
Tested I - Wire Connection.
RUNCMP M I U and RIH wi 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I
U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to First 10 Joints,
Then to Every Other Joint. Tested I - Wire Continuity Every 30
Joints.
RUNCMP Pinched I - Wire on Tubing Slips, Broke Metal Casing. Cut and
Spliced I - Wire. Tested Continuity - OK.
RUNCMP M I U and RIH wI 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I
U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to Every Other
Joint. Tested I - Wire Continuity Every 10 Joints.
RUNCMP M I U Jts. #135, #136 for Tag Up on No-Go in Tieback.
String Wt. Up 97K, Dn 92K
Tagged Up @ 16.53' in on Jt. #136, obtain measurements for
Space Out. U D Jts. #136, #135, & #134. P/U & M/U Space
Out Pups 9.80', 9.82', 7.82'. P/U Jt. #134, Tbg. Hgr. & Ldg. Jt.
RUNCMP MIU I-Wire through Tbg. Hgr. and Test Integrety of fittings &
Wire Continuity
RUNCMP . RIH & Land Hgr. in Tbg. Spool, Check landing marks to insure
proper land out & RILDS
RUNCMP M/U Circ. Lines to 7 5/8" x 41/2" Annulus & Ldg. Jt.
Pressure Test Lines 1/4,000 psi.
RUNCMP : Reverse Circ. 100 bbls. Corrosion Inhibited 9.3 Brine Dn. 75/8"
I x 41/2" Annulus @ 3 bpm @ 200psi
RUNCMP I Drop 1 7/8" BallI Rod Assy. & Pressure up on Tbg. 1/4,200
'psi. to Set the Pkr. (hold 5 min.). Bleed pressure down to
3,500 psi. to Test Tbg. (hold 30 min.). Bleed pressure down to
2,500 psi. & shut in same. Pressure up the 7 5/8" x 4 1/2" ann.
to 3,500 psi. (hold 30 min.). Bled pressure off Tbg. (2,500 psi)
& allow pressure on the IA (3,500psi.) to shear DCK Valve.
Bleed off all excess pressure. To insure opening of the DCK
Valve Rev. Circ. Dn IA @ 3 bpm @ 900 psi. & then Dn Tbg @
3 bpm @ 875 psi.
RUNCMP Blow Dn. all Circ. Lines & RID same from IA & Ldg Jt.
1.50 RUNCOrvP
2.00 RUNCOrvP
I
06:00 - 14:00 8.00 RUNc01
,
I
14:00 - 15:00 ' 1.00 RUNCOM\J HMAN
15:00 - 17:00 2.00 RUNCOIVP
17:00 - 18:30 1.50 RUNCOIVP
18:30 - 19:30
19:30 - 20:00
20:00 - 21 :00
21 :00 - 22:00
.22:00 - 00:00
2/3/2005
00:00 - 00:30
00:30 - 01 :00
1.00 RUNCOMP
0.50 RUNCOIIAP
1.00 RUNCOIVP
1.00 RUNCOMP
2.00 I RUNCOIVP
I
!
I
I
0.50' RUNCOMP
0.50 RUNCOIVP
I
I
RUNCMP UD Ldg. Jt., Set TWC in Tbg. Hgr. & Test from below 1/1,000
psi. OK
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
2/3/2005 01 :00 . 04:30 3.50 BOPSUF P OTHCMP PJSM
N/D BOPE, Remove Rotary Master Bushings & clean drip pan
area.
04:30 . 08:30 4.00 WHSUR P OTHCMP PJSM
N/U Adapter Flange & Tree, Tested Neck Seal & void V 5,000
psi. Good Test
Test I·Wire Continuity- OK
08:30 - 09:00 0.50 WHSUR P OTHCMP R/U & Test Production Tree V 5,000 psi. Good Test, RID test
1.00 WHSUR I P lines.
09:00 - 10:00 OTHCMP R/U DSM & Pull'd TWC, RID DSM
10:00 - 11 :00 1.00 WHSUR P OTHCMP PJSM
R/U Little Red V 7 5/8" x 41/2" IA. Pressure Test lines V
3,OOOpsi.
11 :00 - 12:30 1.501 WHSUR P OTHCMP Pump 100 bbls Diesel Freeze Protect @ 2 bpm @ 1,000 psi.
12:30 - 14:00 1.50 WHSUR P OTHCMP ¡ U-Tube Diesel, 200 psi. on IA & Tbg. when done. Well bore
¡Fluid.
I Hydrostatic Pressure 2,132 psi.
, Formation Pressure 2,300 psi.
14:00 - 15:30 1.50 WHSUR P OTHCMP PJSM
R/U DSM Lubricator, Set BPV., RID DSM. Tested BPV V 1,000
psi. from below. OK. Little Red sucked excess diesel from lines
& RID same
15:30 - 17:00 1.50 WHSUR P OTHCMP RID Secondary IA Valve, DSM Installed VR Plugs
17:00 - 18:00 1.00 WHSUR P OTHCMP Secured Well, Clear & Clean Cellar area.
18:00 - 00:00 6.00 I WHSUR P RUNCMP Clean MOBM fl Dp Drain Racks, Drip Pans, All under floor
containments, Misc. Rig Components.
Rig Released @ 2400 hrs. on 2-3-05
Printed: 2/7/2005 9:37:45 AM
S-213AL2 Survey Report
s
lumberuer
Report Date: 1/8/2005
Client: BP Exploration Alaska
Field: Prudhoe Bay Unit - WOA
Structure I Slot: S-PAD I S-213
Well: S-213
Borehole: S-213AL2
UWV API#: 500292299362
Survey Namel Date: S-213AL21 January 8,2005
Torti AHD/ DDII ERD ratio: 409.968' 18502.61 II 16.913/1.650
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet
Location LatILong: N 70.35551358, W 149.03415537
Location Grid NlE YIX: N 5980549.840 IIUS, E 618929.960 IIUS
Grid Convergence Angle: +0.90963906'
Grid Scale Factor: 0.99991607
Survey I DLS Computation Method: Minimum Curvature I Lubinski
Vertical Section Azimuth: 237.400'
Vertical Section Origin: N 0.000 II, E 0.000 II
TVD Reference Datum: Rotary Table
TVD Reference Elevation: 61.82 II relative to MSL
Sea Bed I Ground Level Elevation: 35.90 II relative to MSL
Magnetic Declination: 24.779'
Total Field Strength: 57613.876 nT
Magnetic Dip: 80.846'
Declination Date: January 07,2005
Magnetic Declination Model: BGGM 2004
North Reference: True North
Total Corr Mag North -> True North: +24.779'
Local Coordinates Referenced To: Well Head
.
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(II) (deg) (deg) (II) (II) (II) (II) (It) (II) (II) (deg/100 II) (IIUS) (IIUS)
Projected-Up 0.00 0.00 297.52 -61.82 0.00 -0.02 0.00 0.11 0.05 -0.10 0.00 5980549.89 618929.86 N 70.35551372 W 149.03415617
MWD+IFR:AK 155.42 0.08 297.52 93.60 155.42 -0.04 0.11 0.22 0.10 -0.20 0.05 5980549.94 618929.76 N 70.35551386 W 149.03415697
233.49 0.19 189.70 171.67 233.49 0.08 0.25 0.27 0.00 -0.27 0.29 5980549.84 618929.69 N 70.35551358 W 149.03415754
327.03 0.28 217.18 265.21 327.03 0.44 0.63 0.55 -0.33 -0.43 0.15 5980549.50 618929.53 N 70.35551266 W 149.03415888
415.75 0.46 188.45 353.93 415.75 1.00 1.19 1.06 -0.86 -0.62 0.29 5980548.97 618929.36 N 70.35551123 W 149.03416037
509.99 0.27 140.23 448.17 509.99 1.50 1.76 1.50 -1.40 -0.53 0.37 5980548.43 618929.45 N 70.35550974 W 149.03415966
602.31 0.35 136.82 540.48 602.30 1.76 2.26 1.79 -1.78 -0.20 0.09 5980548.06 618929.79 N 70.35550872 W 149.03415697
694.94 0.40 110.75 633.11 694.93 1.93 2.86 2.12 -2.10 0.30 0.19 5980547.75 618930.29 N 70.35550785 W 149.03415294
787.96 0.15 142.58 726.13 787.95 2.02 3.29 2.41 -2.31 0.68 0.31 5980547.54 618930.67 N 70.35550727 W 149.03414987
883.26 0.36 98.80 821.43 883.25 2.05 3.70 2.67 -2.45 1.05 0.29 5980547.40 618931.05 N 70.35550687 W 149.03414686
976.53 0.43 98.44 914.70 976.52 1.97 4.34 3.06 -2.55 1.68 0.08 5980547.32 618931.68 N 70.35550661 W 149.03414169
1069.16 0.53 98.28 1007.32 1069.14 1.86 5.12 3.62 -2.66 2.45 0.11 5980547.22 618932.45 N 70.35550630 W 149..46
1160.63 0.56 78.60 1098.79 1160.61 1.59 5.98 4.23 -2.64 3.31 0.21 5980547.26 618933.31 N 70.35550638 W 149. 50
1253.35 0.77 70.45 1191.50 1253.32 1.01 7.05 4.93 -2,34 4.34 0.25 5980547.57 618934.34 N 70.35550719 W 149.03412013
1347.39 1.25 70.29 1285.53 1347.35 0.03 8.71 6.16 -1.78 5.90 0.51 5980548.15 618935.89 N 70.35550871 W 149.03410745
1439.53 1.80 76.02 1377.64 1439.46 -1.30 11.16 8.32 -1.09 8.25 0.62 5980548.88 618938.23 N 70.35551059 W 149.03408837
1534.40 1.41 74.91 1472.47 1534.29 -2.67 13.82 10.83 -0.43 10.82 0.41 5980549.58 618940.79 N 70.35551241 W 149.03406747
1630.00 0.74 66.98 1568.05 1629.87 -3.68 15.61 12.53 0.12 12.53 0.72 5980550.16 618942.48 N 70.35551390 W 149.03405364
1723.15 2.46 259.23 1661.18 1723.00 -3.15 17.31 11.12 -0.02 11.12 3.42 5980550.00 618941.08 N 70.35551353 W 149.03406509
1814.13 6.28 254.60 1751.88 1813.70 0.38 24.24 4.72 -1. 71 4.40 4.21 5980548.20 618934.39 N 70.35550892 W 149.03411964
1863.71 6.40 256.71 1801.15 1862.97 3.19 29.71 3.19 -3.06 -0.90 0.53 5980546.76 618929.10 N 70.35550522 W 149.03416271
1907.37 6.39 253.07 1844.54 1906.36 5.74 34.58 7.07 -4.33 -5.60 0.93 5980545.42 618924.43 N 70.35550175 W 149.03420081
2000.61 6.09 240.31 1937.24 1999.06 12.18 44.67 17.01 -8.29 -14.86 1.52 5980541 .32 618915.24 N 70.35549093 W 149.03427601
2095.16 5.63 239.01 2031.29 2093.11 19.22 54.32 26.66 -13.16 -23.19 0.51 5980536.31 618906.98 N 70.35547762 W 149.03434367
2187.42 5.36 237.61 2123.13 2184.95 25.81 63.16 35.49 -17.80 -30.71 0.33 5980531.56 618899.54 N 70.35546495 W 149.03440472
SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 1 of 7
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(It) (deg) (deg) (It) (It) (It) (It) (It) (It) (It) (deg/100 It) (ltUS) (ltUS)
2282.02 5.13 235.24 2217.33 2279.15 32.44 71.80 44.13 -22.58 -37.91 0.33 5980526.66 618892.41 N 70.35545190 W 149.03446323
2375.30 7.07 239.64 2310.08 2371.90 39.88 81.71 54.03 -27.86 -46.29 2.14 5980521.25 618884.12 N 70.35543747 W 149.03453128
2469.73 12.17 244.54 2403.15 2464.97 50.80 97.48 69.77 -35.08 -60.31 5.47 5980513.81 618870.22 N 70.35541775 W 149.03464505
2503.22 14.39 244.19 2435.74 2497.56 55.96 105.17 77 .44 -38.41 -67.24 6.63 5980510.37 618863.34 N 70.35540865 W 149.03470135
2532.82 15.76 243.38 2464.32 2526.14 61.19 112.87 85.12 -41.81 -74.14 4.68 5980506.86 618856.49 N 70.35539935 W 149.03475742
2562.81 17.56 242.48 2493.05 2554.87 67.12 121.46 93.71 -45.73 -81.80 6.06 5980502.82 618848.90 N 70.35538866 W 149.03481957
2591.90 19.43 241.38 2520.64 2582.46 73.60 130.69 102.94 -50.Q7 -89.94 6.54 5980498.35 618840.84 N 70.35537678 W 149.03488567
2628.07 19.93 240.84 2554.70 2616.52 82.28 142.87 115.12 -55.96 -100.60 1.47 5980492.30 618830.27 N 70.35536070 W 149.03497226
2655.84 20.53 241.04 2580.75 2642.57 89.14 152.48 124.72 -60.62 -109.00 2.17 5980487.50 618821.95 N 70.35534796 W 149.03504042
2686.92 21.45 241.15 2609.77 2671.59 97.08 163.61 135.85 -66.00 -118.74 2.96 5980481.97 618812.29 N 70.35533326 W 149.03511955
2718.71 22.14 240.27 2639.29 2701.11 105.54 175.41 147.66 -71.78 -129.04 2.40 5980476.03 618802.09 N 70.35531748 W 149.0.3
2749.91 23.21 238.46 2668.08 2729.90 114.37 187.44 159.68 -77.91 -139.38 4.09 5980469.73 618791.84 N 70.35530073 W 149.0 4
MWD+IFR:AK 2798.38 24.47 236.38 2712.41 2774.23 129.18 207.03 179.24 -88.46 -155.88 3.12 5980458.92 618775.52 N 70.35527190 W 149.03 12
Tie-In Survey 2856.54 26.47 236.45 2764.92 2826.74 148.37 232.04 204.19 -102.30 -176.72 3.44 5980444.76 618754.90 N 70.35523410 W 149.03559029
Blind ( Inc IAB+Trend) 2909.66 29.58 236.00 2811.80 2873.62 167.58 256.99 229.10 -116.18 -197.46 5.87 5980430.55 618734.39 N 70.35519619 W 149.03575870
Blind ( Inc IAB+ Trend) 3006.92 33.61 231.80 2894.64 2956.46 208.12 307.92 279.81 -146.26 -238.54 4.72 5980399.82 618693.80 N 70.35511399 W 149.03609224
MWD+IFR+MS 3102.80 37.72 227.46 2972.53 3034.35 254.98 363.79 335.10 -182.53 -281.03 5.03 5980362.89 618651.89 N 70.35501492 W 149.03643724
3199.21 41.06 226.91 3047.03 3108.85 307.61 424.97 395.51 -224.11 -325.89 3.48 5980320.61 618607.70 N 70.35490132 W 149.03680152
3295.21 43.34 232.11 3118.17 3179.99 361.63 489.42 459.65 -265.90 -374.94 4.34 5980278.05 618559.32 N 70.35478715 W 149.03719974
3392.93 45.61 237.12 3187.91 3249.73 415.45 557.86 528.06 -305.46 -430.75 4.28 5980237.60 618504.15 N 70.35467904 W 149.03765290
3488.29 44.79 237.13 3255.11 3316.93 466.84 625.52 595.67 -342.19 -487.58 0.86 5980199.98 618447.92 N 70.35457870 W 149.03811430
3584.58 45.23 235.98 3323.18 3385.00 518.99 693.62 663.75 -379.73 -544.40 0.96 5980161.55 618391.71 N 70.35447615 W 149.03857564
3680.92 44.69 235.88 3391.35 3453.17 571.61 761.69 731.81 -417.86 -600.79 0.57 5980122.53 618335.93 N 70.35437195 W 149.03903347
3776.78 45.06 236.81 3459.28 3521.10 623.56 829.33 799.43 -455.34 -657.08 0.79 5980084.16 618280.24 N 70.35426955 W 149.03949057
3873.18 44.60 236.48 3527.65 3589.47 675.54 897.29 867.38 -492.71 -713.85 0.53 5980045.90 618224.08 N 70.35416745 W 149.03995146
3968.74 44.05 237.25 3596.01 3657.83 726.45 964.06 934.13 -529.21 -769.76 0.81 5980008.53 618168.76 N 70.35406773 W 149.04040540
4064.79 43.64 237.36 3665.29 3727.11 776.84 1030.60 1000.63 -565.15 -825.75 0.43 5979971.70 618113.35 N 70.35396952 W 149.04085999
4160.95 43.86 238.30 3734.75 3796.57 826.80 1097.09 1067.08 -600.55 -882.04 0.71 5979935.42 618057.64 N 70.35387279 W 149.04131697
4257.35 43.42 238.37 3804.51 3866.33 876.40 1163.62 1133.54 -635.47 -938.67 0.46 5979899.60 618001.58 N 70.35377736 W 149..668
4348.86 43.94 237.59 3870.69 3932.51 923.78 1226.82 1196.70 -668.98 -992.25 0.82 5979865.25 617948.54 N 70.35368580 W 149. 170
4446.91 43.12 237.35 3941.78 4003.60 974.80 1294.35 1264.21 -705.30 -1049.18 0.85 5979828.04 617892.20 N 70.35358657 W 149.04267393
4545.83 44.42 236.52 4013.21 4075.03 1026.92 1362.77 1332.63 -742.64 -1106.53 1.44 5979789.80 617835.46 N 70.35348455 W 149.04313946
4641.52 44.65 236.80 4081 .42 4143.24 1078.24 1429.89 1399.74 -779.52 -1162.59 0.32 5979752.03 617779.99 N 70.35338376 W 149.04359463
4737.67 43.99 236.28 4150.21 4212.03 1129.69 1497.06 1466.91 -816.56 -1218.64 0.78 5979714.11 617724.54 N 70.35328255 W 149.04404961
4831.97 43.63 236.15 4218.26 4280.08 1179.94 1562.34 1532.19 -852.86 -1272.89 0.39 5979676.96 617670.88 N 70.35318336 W 149.04449008
4928.03 44.71 235.59 4287.16 4348.98 1231.71 1629.28 1599.13 -890.41 -1328.29 1.20 5979638.53 617616.08 N 70.35308073 W 149.04493984
5023.20 44.27 235.98 4355.06 4416.88 1283.37 1695.97 1665.82 -927.92 -1383.45 0.54 5979600.16 617561.54 N 70.35297825 W 149.04538755
5119.83 43.93 235.90 4424.45 4486.27 1335.33 1763.21 1733.06 -965.58 -1439.16 0.36 5979561.62 617506.44 N 70.35287533 W 149.04583980
5216.82 44.04 234.58 4494.24 4556.06 1387.89 1830.57 1800.41 -1003.98 -1494.49 0.95 5979522.35 617451.73 N 70.35277039 W 149.04628899
5313.24 44.17 235.63 4563.47 4625.29 1440.36 1897.68 1867.50 -1042.37 -1549.53 0.77 5979483.10 617397.31 N 70.35266549 W 149.04673579
5409.71 43.74 235.73 4632.92 4694.74 1492.30 1964.63 1934.46 -1080.12 -1604.83 0.45 5979444.47 617342.62 N 70.35256232 W 149.04718470
5505.37 45.59 235.49 4700.95 4762.77 1544.50 2031.88 2001.70 -1118.10 -1660.32 1.94 5979405.62 617287.74 N 70.35245853 W 149.04763513
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 2 of 7
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude I
Depth Section Departure
(II) (deg) (deg) (II) (II) (II) (II) (II) (II) (II) (deg/100 fI) (IIUS) (flUS)
5602.48 48.31 234.89 4767.24 4829.06 1599.92 2102.83 2072.65 -1158.61 -1718.57 2.84 5979364.19 617230.14 N 70.35234781 W 149.04810801
5697.64 51.38 233.90 4828.60 4890.42 1657.35 2175.55 2145.34 -1200.96 -1777.69 3.32 5979320.91 617171.71 N 70.35223208 W 149.04858789
5793.44 54.39 235.09 4886.40 4948.22 1717.57 2251.94 2221.70 -1245.31 -1839.88 3.29 5979275.59 617110.24 N 70.35211089 W 149.04909269
5889.06 57.95 233.06 4939.63 5001.45 1780.56 2331.35 2301.07 -1291.93 -1904.17 4.12 5979227.96 617046.70 N 70.35198349 W 149.04961454
MWD+IFR+MS 5985.53 61.01 230.89 4988.62 5050.44 1848.27 2414.45 2383.97 -1343.13 -1969.60 3.72 5979175.73 616982.10 N 70.35184357 W 149.05014567
Tie-In Survey 6079.45 65.32 228.53 5031.01 5092.83 1918.41 20224.54 2467.31 -1397.33 -2033.49 1.74 5979120.53 616919.09 N 70.35169545 W 149.05066419
Top Window (Blind) 6108.00 66.72 228.09 5042.61 5104.43 1940.59 20250.62 2493.19 -1414.68 -2052.96 5.10 5979102.87 616899.89 N 70.35164804 W 149.05082229
Base Window (Blind) 6120.00 68.58 227.58 5047.18 5109.00 1950.07 20261.72 2504.19 -1422.13 -2061.19 15.99 5979095.29 616891.78 N 70.35162768 W 149.05088905
Blind 6138.00 68.58 227.58 5053.75 5115.57 1964.43 20278.48 2520.79 -1433.43 -2073.56 0.00 5979083.80 616879.59 N 70.35159679 W 149.05098945
Blind ( Inc IAB+ Trend) 6150.44 71.83 227.70 5057.96 5119.78 1974.45 20290.18 2532.39 -1441.32 -2082.21 26.14 5979075.77 616871.07 N 70.35157524 W 149.05105964
Blind (Inc IAB+Trend) 6182.64 75.37 228.20 5067.05 5128.87 2000.81 20321.07 2563.02 -1462.00 -2105.14 11.09 5979054.73 616848.47 N 70.35151871 W 149.05124579
Blind (Inc IAB+Trend) 6214.86 79.31 229.00 5074.11 5135.93 2027.44 20352.50 2594.25 -1482.79 -2128.72 12.47 5979033.58 616825.23 N 70.35146191 W 149.0.5
Blind ( Inc IAB+ Trend) 6246.66 81.05 229.80 5079.54 5141.36 2053.76 20383.83 2625.42 -1503.18 -2152.51 6.01 5979012.81 616801.77 N 70.35140619 W 149.0 4
MWD 6278.79 82.19 230.68 5084.22 5146.04 2080.21 20415.62 2657.10 -1523.51 -2176.95 4.46 5978992.10 616777.66 N 70.35135063 W 149.05182857
MWD 6310.73 86.40 231.48 5087.39 5149.21 2106.38 20447.39 2688.80 -1543.47 -2201.67 13.41 5978971.75 616753.26 N 70.35129608 W 149.05202922
First MWD+IFR+MS 6342.35 87.99 230.96 5088.94 5150.76 2132.35 20478.97 2720.31 -1563.25 -2226.29 5.29 5978951.58 616728.96 N 70.35124203 W 149.05222904
6374.53 88.81 227.00 5089.84 5151.66 2159.49 20511.14 2752.30 -1584.36 -2250.55 12.56 5978930.09 616705.04 N 70.35118434 W 149.05242597
6406.60 92.23 225.75 5089.55 5151.37 2187.31 20543.20 2784.02 -1606.48 -2273.76 11.35 5978907.61 616682.18 N 70.35112389 W 149.05261434
6438.86 93.70 225.64 5087.88 5149.70 2215.44 20575.42 2815.84 -1628.98 -2296.82 4.57 5978884.75 616659.49 N 70.35106239 W 149.05280145
6468.38 96.37 223.07 5085.29 5147.11 2241.45 20604.82 2844.77 -1650.00 -2317.37 12.53 5978863.40 616639.27 N 70.35100495 W 149.05296827
6502.04 100.67 221.71 5080.30 5142.12 2271 .39 20638.10 2877.31 -1674.58 -2339.81 13.38 5978838.47 616617.23 N 70.35093778 W 149.05315037
6533.70 101.58 222.49 5074.19 5136.01 2299.42 20669.17 2907.67 -1697.63 -2360.64 3.76 5978815.10 616596.77 N 70.35087480 W 149.05331938
6565.97 100.82 220.73 5067.92 5129.74 2328.09 20700.82 2938.56 -1721.30 -2381.65 5.85 5978791.10 616576.13 N 70.35081012 W 149.05348996
6598.45 98.52 219.01 5062.47 5124.29 2357.49 20732.84 2969.60 -1745.87 -2402.18 8.80 5978766.21 616556.01 N 70.35074297 W 149.05365649
6629.06 96.71 216.76 5058.41 5120.23 2385.75 20763.18 2998.76 -1769.81 -2420.80 9.38 5978741.97 616537.76 N 70.35067754 W 149.05380766
6659.75 94.06 213.83 5055.53 5117.35 2414.67 20793.73 3027.73 -1794.75 -2438.45 12.84 5978716.77 616520.51 N 70.35060941 W 149.05395087
6690.19 92.72 211.66 5053.73 5115.55 2443.85 20824.11 3056.14 -1820.30 -2454.89 8.37 5978690.95 616504.49 N 70.35053958 W 149.05408421
6722.07 92.79 209.78 5052.20 5114.02 2474.72 20855.96 3085.53 -1847.68 -2471.15 5.89 5978663.33 616488.66 N 70.35046478 W 149.05421619
6754.46 93.00 208.34 5050.56 5112.38 2506.30 20888.31 3115.08 -1875.95 -2486.87 4.49 5978634.81 616473.40 N 70.35038752 W 149..66
6784.69 93.27 205.71 5048.91 5110.73 2535.98 20918.49 3142.24 -1902.84 -2500.58 8.73 5978607.71 616460.11 N 70.35031406 W 149. 92
6816.88 92.11 202.50 5047.40 5109.22 2567.85 20950.65 3170.50 -1932.18 -2513.71 10.59 5978578.16 616447.45 N 70.35023388 W 149. 143
6848.95 91.45 198.89 5046.40 5108.22 2599.81 20982.70 3197.80 -1962.17 -2525.04 11.44 5978548.01 616436.61 N 70.35015196 W 149.05465329
6881.60 91.15 196.22 5045.66 5107.48 2632.45 21015.34 3224.72 -1993.28 -2534.88 8.23 5978516.74 616427.26 N 70.35006694 W 149.05473312
6912.65 92.07 192.41 5044.79 5106.61 2663.45 21046.38 3249.39 -2023.35 -2542.55 12.62 5978486.56 616420.06 N 70.34998479 W 149.05479532
6944.79 92.14 192.20 5043.61 5105.43 2695.48 21078.50 3274.35 -2054.73 -2549.40 0.69 5978455.07 616413.72 N 70.34989905 W 149.05485080
6977.36 91.83 191.15 5042.48 5104.30 2727.92 21111.05 3299.55 -2086.61 -2555.99 3.36 5978423.10 616407.64 N 70.34981196 W 149.05490418
7008.85 92.83 190.97 5041.20 5103.02 2759.24 21142.51 3323.81 -2117.49 -2562.02 3.23 5978392.13 616402.09 N 70.34972760 W 149.05495310
7041.24 96.89 190.14 5038.46 5100.28 2791.33 21174.78 3348.64 -2149.21 -2567.93 12.79 5978360.32 616396.69 N 70.34964093 W 149.05500099
7073.30 97.79 189.70 5034.36 5096.18 2822.91 21206.57 3373.00 -2180.53 -2573.41 3.12 5978328.92 616391.71 N 70.34955536 W 149.05504537
7105.18 97.75 188.84 5030.05 5091.87 2854.25 21238.16 3397.10 -2211.70 -2578.50 2.68 5978297.67 616387.12 N 70.34947019 W 149.05508659
7137.41 97.86 189.18 5025.67 5087.49 2885.90 21270.09 3421.49 -2243.24 -2583.50 1.10 5978266.06 616382.62 N 70.34938403 W 149.05512710
7169.85 97.72 190.62 5021.28 5083.10 2917.83 21302.23 3446.48 -2274.90 -2589.03 4.42 5978234.32 616377.60 N 70.34929753 W 149.05517186
7200.90 97.58 189.79 5017.14 5078.96 2948.41 21333.01 3470.62 -2305.19 -2594.48 2.69 5978203.95 616372.63 N 70.34921478 W 149.05521604
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 3 of 7
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude r
Depth Section Departure
(II) (deg) (deg) (II) (II) ( II) (II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS)
7233.68 95.47 188.81 5013.42 5075.24 2980.72 21365.57 3495.96 -2337.33 -2599.74 7.09 5978171.74 616367.87 N 70.34912698 W 149.05525866
7266.09 92.35 189.31 5011.21 5073.03 3012.77 21397.90 3521.15 -2369.25 -2604.83 9.75 5978139.74 616363.29 N 70.34903976 W 149.05529990
7297.76 91.87 190.78 5010.04 5071.86 3044.22 21429.55 3546.26 -2400.42 -2610.35 4.88 5978108.50 616358.27 N 70.34895462 W 149.05534462
7329.43 92.00 189.67 5008.97 5070.79 3075.68 21461.20 3571.53 -2431.57 -2615.97 3.53 5978077.26 616353.14 N 70.34886952 W 149.05539014
7361.41 91.42 190.44 5008.02 5069.84 3107.44 21493.17 3597.10 -2463.04 -2621.55 3.01 5978045.71 616348.06 N 70.34878352 W 149.05543535
7393.80 90.73 189.47 5007.41 5069.23 3139.61 21525.55 3623.07 -2494.94 -2627.15 3.67 5978013.73 616342.97 N 70.34869638 W 149.05548070
7425.82 90.22 188.59 5007.14 5068.96 3171.35 21557.57 3648.54 -2526.56 -2632.17 3.18 5977982.03 616338.45 N 70.34860999 W 149.05552141
7457.86 88.61 191.98 5007.47 5069.29 3203.19 21589.61 3674.54 -2558.08 -2637.89 11.71 5977950.43 616333.23 N 70.34852388 W 149.05556774
7489.42 88.33 193.64 5008.31 5070.13 3234.67 21621.16 3701.02 -2588.84 -2644.89 5.33 5977919.57 616326.73 N 70.34843983 W 149.05562443
7521.64 91.15 195.96 5008.46 5070.28 3266.87 21653.38 3728.72 -2619.98 -2653.12 11.33 5977888.30 616319.00 N 70.34835474 W 149.05569114
7554.02 93.65 199.17 5007.10 5068.92 3299.21 21685.72 3757.36 -2650.82 -2662.88 12.56 5977857.31 616309.73 N 70.34827049 W 149.0.7
7585.90 93.48 201.10 5005.12 5066.94 3330.97 21717.54 3786.22 -2680.69 -2673.83 6.07 5977827.27 616299.25 N 70.34818887 W 149.0 9
7618.48 94.44 201 .43 5002.87 5064.69 3363.36 21750.04 3816.01 -2710.98 -2685.62 3.12 5977796.80 616287.95 N 70.34810611 W 149.05 68
7650.40 95.78 201.59 5000.03 5061.85 3395.03 21781.84 3845.25 -2740.56 -2697.27 4.23 5977767.04 616276.76 N 70.34802529 W 149.05604922
7681.96 94.72 201.50 4997.14 5058.96 3426.34 21813.26 3874.20 -2769.79 -2708.82 3.37 5977737.64 616265.69 N 70.34794542 W 149.05614281
7714.43 93.41 202.55 4994.84 5056.66 3458.58 21845.65 3904.18 -2799.81 -2720.96 5.17 5977707.43 616254.02 N 70.34786339 W 149.05624131
7745.65 92.24 200.95 4993.30 5055.12 3489.63 21876.83 3933.02 -2828.78 -2732.52 6.34 5977678.29 616242.93 N 70.34778426 W 149.05633501
7777.89 89.91 201.71 4992.70 5054.52 3521.75 21909.07 3962.77 -2858.80 -2744.24 7.60 5977648.08 616231.68 N 70.34770223 W 149.05643008
7810.83 89.77 201.74 4992.79 5054.61 3554.55 21942.00 3993.31 -2889.40 -2756.43 0.43 5977617.30 616219.98 N 70.34761862 W 149.05652896
7842.55 90.53 200.90 4992.71 5054.53 3586.16 21973.72 4022.67 -2918.95 -2767.96 3.57 5977587.57 616208.92 N 70.34753788 W 149.05662248
7874.28 90.67 200.98 4992.37 5054.19 3617.80 22005.45 4051.99 -2948.58 -2779.30 0.51 5977557.77 616198.05 N 70.34745692 W 149.05671443
7906.85 91.04 198.91 4991.89 5053.71 3650.30 22038.02 4081.91 -2979.19 -2790.41 6.46 5977526.98 616187.43 N 70.34737328 W 149.05680450
7937.02 88.85 198.37 4991.92 5053.74 3680.45 22068.19 4109.38 -3007.78 -2800.05 7.48 5977498.25 616178.24 N 70.34729517 W 149.05688268
7969.17 87.82 197.70 4992.85 5054.67 3712.58 22100.32 4138.55 -3038.33 -2810.00 3.82 5977467.54 616168.78 N 70.34721168 W 149.05696334
8001.36 88.50 195.87 4993.88 5055.70 3744.75 22132.50 4167.50 -3069.14 -2819.29 6.06 5977436.60 616159.98 N 70.34712753 W 149.05703865
8033.59 88.74 193.70 4994.66 5056.48 3776.95 22164.72 4196.03 -3100.29 -2827.52 6.77 5977405.33 616152.26 N 70.34704242 W 149.05710529
8065.20 89.19 190.43 4995.23 5057.05 3808.46 22196.32 4223.34 -3131.19 -2834.12 10.44 5977374.32 616146.14 N 70.34695799 W 149.05715881
8097.62 90.22 187.55 4995.40 5057.22 3840.59 22228.74 4250.51 -3163.21 -2839.19 9.43 5977342.23 616141.59 N 70.34687051 W 149.05719982
8129.55 90.97 185.69 4995.07 5056.89 3872.04 22260.67 4276.61 -3194.92 -2842.87 6.28 5977310.47 616138.41 N 70.34678387 W 149..60
8160.69 91.80 185.95 4994.31 5056.13 3902.63 22291.80 4301.89 -3225.89 -2846.02 2.79 5977279.45 616135.75 N 70.34669926 W 149. 12
8194.13 91.93 183.21 4993.23 5055.05 3935.32 22325.22 4328.68 -3259.20 -2848.69 8.20 5977246.11 616133.61 N 70.34660825 W 149.05727668
8225.94 91.80 182.51 4992.19 5054.01 3966.21 22357.02 4353.68 -3290.96 -2850.28 2.24 5977214.33 616132.53 N 70.34652150 W 149.05728946
8256.46 91.52 181.64 4991.31 5053.13 3995.75 22387.52 4377.49 -3321.44 -2851.38 2.99 5977183.84 616131.91 N 70.34643821 W 149.05729833
8289.35 91.45 180.55 4990.45 5052.27 4027.44 22420.40 4402.89 -3354.32 -2852.01 3.32 5977150.96 616131.80 N 70.34634841 W 149.05730333
8321.05 91.93 177.16 4989.52 5051.34 4057.63 22452.09 4426.66 -3385.99 -2851.38 10.80 5977119.30 616132.93 N 70.34626187 W 149.05729809
8352.54 92.28 179.57 4988.36 5050.18 4087.52 22483.56 4450.19 -3417.45 -2850.48 7.73 5977087.87 616134.33 N 70.34617595 W 149.05729071
8385.04 91.80 180.08 4987.20 5049.02 4118.63 22516.04 4475.12 -3449.92 -2850.38 2.15 5977055.40 616134.95 N 70.34608722 W 149.05728980
8417.19 91.32 179.87 4986.33 5048.15 4149.44 22548.17 4499.93 -3482.06 -2850.37 1.63 5977023.27 616135.47 N 70.34599942 W 149.05728959
8449.25 91.32 178.98 4985.59 5047.41 4180.07 22580.22 4524.57 -3514.11 -2850.05 2.78 5976991.23 616136.30 N 70.34591186 W 149.05728688
8481 .49 91.01 180.07 4984.94 5046.76 4210.89 22612.46 4549.48 -3546.34 -2849.78 3.51 5976959.01 616137.08 N 70.34582381 W 149.05728461
8513.50 90.94 179.71 4984.39 5046.21 4241.55 22644.46 4574.44 -3578.35 -2849.72 1.15 5976927.01 616137.65 N 70.34573637 W 149.05728401
8545.30 90.60 179.89 4983.96 5045.78 4272.00 22676.26 4599.28 -3610.15 -2849.61 1.21 5976895.22 616138.27 N 70.34564951 W 149.05728301
SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3f712005 1 :01 PM Page 4 of 7
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude r
Depth Section Departure
(It) ( deg) (deg) (It) (II) (II) (II) (It) (II) (It) (deg/100 II) (ltUS) (IIUS)
8577.72 91.01 179.03 4983.51 5045.33 4302.99 22708.68 4624.58 -3642.56 -2849.30 2.94 5976862.82 616139.09 N 70.34556095 W 149.05728043
8609.74 90.73 178.89 4983.02 5044.84 4333.51 22740.69 4649.48 -3674.57 -2848.72 0.98 5976830.83 616140.17 N 70.34547350 W 149.05727562
8641.86 90.91 178.44 4982.56 5044.38 4364.08 22772.81 4674.44 -3706.68 -2847.97 1.51 5976798.74 616141.43 N 70.34538578 W 149.05726945
8674.80 90.97 179.59 4982.02 5043.84 4395.48 22805.75 4700.26 -3739.61 -2847.41 3.50 5976765.82 616142.52 N 70.34529582 W 149.05726475
8706.84 91.80 177.01 4981.25 5043.07 4425.90 22837.78 4725.19 -3771.62 - 2846.46 8.46 5976733.83 616143.98 N 70.34520837 W 149.05725694
8738.52 92.38 177.90 4980.09 5041.91 4455.82 22869.43 4749.63 -3803.25 -2845.05 3.35 5976702.23 616145.89 N 70.34512197 W 149.05724543
8771.04 92.38 177.97 4978.74 5040.56 4486.61 22901.93 4774.98 -3835.72 -2843.88 0.22 5976669.79 616147.57 N 70.34503326 W 149.05723583
8802.98 91.04 177.92 4977.79 5039.61 4516.87 22933.85 4799.97 -3867.63 -2842.73 4.20 5976637.91 616149.22 N 70.34494610 W 149.05722644
8834.85 90.70 176.87 4977.30 5039.12 4546.97 22965.72 4824.80 -3899.46 -2841.29 3.46 5976606.10 616151.18 N 70.34485914 W 149.05721459
8867.43 90.77 178.02 4976.89 5038.71 4577.76 22998.30 4850.29 -3932.00 -2839.83 3.54 5976573.59 616153.15 N 70.34477023 W 149.05720270
8899.58 90.60 176.95 4976.50 5038.32 4608.14 23030.44 4875.54 -3964.12 -2838.42 3.37 5976541.50 616155.07 N 70.34468249 W 149.05719115
8931.45 90.90 177.73 4976.08 5037.90 4638.24 23062.31 4900.60 -3995.95 -2836.94 2.62 5976509.70 616157.05 N 70.34459553 W 149.0.5
8963.82 90.29 176.97 4975.75 5037.57 4668.81 23094.68 4926.14 -4028.29 -2835.45 3.01 5976477.40 616159.06 N 70.34450720 W 149.0 1
8995.67 89.02 179.89 4975.94 5037.76 4699.08 23126.53 4951.70 -4060.12 -2834.58 10.00 5976445.59 616160.44 N 70.34442024 W 149.05715963
9027.75 89.26 179.27 4976.42 5038.24 4729.76 23158.60 4977.90 -4092.19 -2834.34 2.07 5976413.52 616161.18 N 70.34433261 W 149.05715762
9059.92 89.77 181.82 4976.69 5038.51 4760.68 23190.77 5004.55 -4124.36 -2834.65 8.08 5976381.36 616161.39 N 70.34424474 W 149.05716001
9092.28 90.19 182.92 4976.71 5038.53 4792.05 23223.13 5031.99 -4156.69 -2835.98 3.64 5976349.01 616160.56 N 70.34415641 W 149.05717077
9124.46 90.46 182.08 4976.52 5038.34 4823.27 23255.31 5059.36 -4188.84 -2837.39 2.74 5976316.85 616159.67 N 70.34406858 W 149.05718206
9156.22 90.01 182.23 4976.39 5038.21 4854.03 23287.07 5086.34 -4220.58 -2838.58 1.49 5976285.10 616158.98 N 70.34398188 W 149.05719165
9188.52 89.84 182.80 4976.43 5038.25 4885.37 23319.37 5113.93 -4252.84 -2840.00 1.84 5976252.81 616158.07 N 70.34389372 W 149.05720306
9219.76 89.91 181.77 4976.50 5038.32 4915.65 23350.61 5140.61 -4284.06 -2841.24 3.30 5976221.59 616157.32 N 70.34380844 W 149.05721307
9252.17 89.91 181.91 4976.55 5038.37 4947.00 23383.02 5168.21 -4316.45 -2842.29 0.43 5976189.18 616156.80 N 70.34371995 W 149.05722141
9282.98 89.84 182.31 4976.62 5038.44 4976.84 23413.83 5194.57 -4347.24 -2843.42 1.32 5976158.38 616156.15 N 70.34363583 W 149.05723052
9313.66 89.09 181.27 4976.91 5038.73 5006.50 23444.51 5220.78 -4377.91 -2844.38 4.18 5976127.71 616155.68 N 70.34355206 W 149.05723821
9340.22 88.71 182.24 4977.42 5039.24 5032.18 23471.06 5243.50 -4404.45 -2845.19 3.92 5976101.16 616155.29 N 70.34347955 W 149.05724472
9375.15 89.16 180.79 4978.07 5039.89 5065.91 23505.99 5273.35 -4439.36 -2846.11 4.35 5976066.24 616154.92 N 70.34338417 W 149.05725211
9405.18 87.96 180.62 4978.82 5040.64 5094.79 23536.01 5298.85 -4469.38 -2846.48 4.04 5976036.23 616155.03 N 70.34330217 W 149.05725501
9436.08 87.95 180.46 4979.92 5041.74 5124.47 23566.89 5325.07 -4500.25 -2846.78 0.52 5976005.35 616155.23 N 70.34321781 W 149.05725728
9466.74 86.79 180.31 4981.33 5043.15 5153.89 23597.52 5351.09 -4530.88 -2846.98 3.81 5975974.73 616155.51 N 70.34313414 W 149..86
9498.04 86.51 182.37 4983.16 5044.98 5184.04 23628.76 5377.95 -4562.12 -2847.71 6.63 5975943.48 616155.27 N 70.34304881 W 149. 69
9528.45 88.13 182.38 4984.58 5046.40 5213.49 23659.14 5404.39 -4592.47 -2848.97 5.33 5975913.12 616154.50 N 70.34296589 W 149. 481
9559.69 88.78 183.96 4985.42 5047.24 5243.88 23690.37 5431.81 -4623.65 -2850.70 5.47 5975881.92 616153.26 N 70.34288071 W 149.05728873
9590.16 88.51 183.62 4986.14 5047.96 5273.59 23720.83 5458.76 -4654.04 -2852.71 1.42 5975851.50 616151.73 N 70.34279767 W 149.05730497
9621.40 88.23 184.49 4987.03 5048.85 5304.07 23752.06 5486.49 -4685.19 -2854.92 2.92 5975820.32 616150.02 N 70.34271257 W 149.05732279
9652.71 89.94 184.31 4987.53 5049.35 5334.68 23783.36 5514.41 -4716.40 -2857.32 5.49 5975789.08 616148.11 N 70.34262730 W 149.05734219
9683.01 90.05 183.94 4987.54 5049.36 5364.27 23813.66 5541.41 -4746.62 -2859.50 1.27 5975758.83 616146.41 N 70.34254474 W 149.05735978
9713.96 89.91 184.63 4987.55 5049.37 5394.51 23844.61 5569.05 -4777 .49 -2861.81 2.27 5975727.94 616144.59 N 70.34246042 W 149.05737845
9744.82 89.81 184.76 4987.62 5049.44 5424.72 23875.47 5596.75 -4808.24 -2864.34 0.53 5975697.15 616142.56 N 70.34237639 W 149.05739885
9775.44 90.22 185.53 4987.61 5049.43 5454.73 23906.09 5624.37 -4838.74 -2867.08 2.85 5975666.61 616140.29 N 70.34229308 W 149.05742104
9806.19 89.77 185.26 4987.62 5049.44 5484.90 23936.84 5652.20 -4869.35 -2869.98 1.71 5975635.96 616137.89 N 70.34220944 W 149.05744440
9836.19 90.49 184.94 4987.55 5049.37 5514.31 23966.84 5679.31 -4899.24 -2872.64 2.63 5975606.04 616135.70 N 70.34212780 W 149.05746595
9867.07 91.35 184.07 4987.05 5048.87 5544.50 23997.72 5707.11 -4930.02 -2875.07 3.96 5975575.23 616133.76 N 70.34204371 W 149.05748553
9897.95 91.32 183.01 4986.33 5048.15 5574.58 24028.59 5734.70 -4960.83 -2876.97 3.43 5975544.39 616132.35 N 70.34195953 W 149.05750091
SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Sld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 5 of 7
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(II) (deg) (deg) (II) (II) (II) (II) (II) (II) (II) (deg/100 II) (ftUS) (IIUS)
9929.20 91.08 180.74 4985.68 5047.50 5604.81 24059.83 5762.24 -4992.05 -2878.00 7.30 5975513.16 616131.82 N 70.34187423 W 149.05750910
9959.60 90.87 181.02 4985.16 5046.98 5634.07 24090.23 5788.82 -5022.44 -2878.46 1.15 5975482.77 616131.83 N 70.34179120 W 149.05751280
9990.64 89.19 179.00 4985.15 5046.97 5663.83 24121.26 5815.78 -5053.48 -2878.47 8.46 5975451.74 616132.32 N 70.34170641 W 149.05751274
10022.57 89.26 178.60 4985.58 5047.40 5694.24 24153.19 5843.20 -5085.40 -2877.80 1.27 5975419.83 616133.50 N 70.34161921 W 149.05750722
10054.74 89.67 178.69 4985.88 5047.70 5724.85 24185.36 5870.84 -5117.56 -2877.04 1.30 5975387.69 616134.77 N 70.34153135 W 149.05750094
10087.10 89.67 179.71 4986.06 5047.88 5755.74 24217.72 5898.85 -5149.92 -2876.59 3.15 5975355.35 616135.73 N 70.34144296 W 149.05749718
10118.28 89.88 178.56 4986.19 5048.01 5785.49 24248.90 5925.86 -5181.09 -2876.12 3.75 5975324.19 616136.70 N 70.34135779 W 149.05749326
10151.06 89.36 177.38 4986.40 5048.22 5816.56 24281.68 5953.96 -5213.85 -2874.96 3.93 5975291.46 616138.38 N 70.34126830 W 149.05748374
10182.44 86.89 176.19 4987.43 5049.25 5846.08 24313.04 5980.55 -5245.16 -2873.20 8.74 5975260.18 616140.63 N 70.34118276 W 149.05746937
10215.15 86.34 175.59 4989.36 5051.18 5876.63 24345.69 6008.02 -5277.73 -2870.86 2.49 5975227.66 616143.49 N 70.34109379 W 149.05745028
10246.72 86.41 175.42 4991.36 5053.18 5906.04 24377.20 6034.45 -5309.14 -2868.39 0.58 5975196.29 616146.46 N 70.34100799 W 149.0.4
10278.77 87.10 173.18 4993.17 5054.99 5935.65 24409.20 6060.98 -5340.98 -2865.21 7.30 5975164.51 616150.14 N 70.34092101 W 149.0 6
10310.79 88.61 173.46 4994.37 5056.19 5965.06 24441.19 6087.25 -5372.76 -2861.49 4.80 5975132.80 616154.37 N 70.34083420 W 149.05 96
10342.87 90.60 175.73 4994.59 5056.41 5994.81 24473.27 6114.04 -5404.69 -2858.47 9.41 5975100.92 616157.90 N 70.34074696 W 149.05734934
10374.76 88.23 175.28 4994.92 5056.74 6024.57 24505.16 6141.00 -5436.48 -2855.97 7.56 5975069.18 616160.90 N 70.34066012 W 149.05732897
10406.65 86.96 173.75 4996.26 5058.08 6054.11 24537.02 6167.68 -5468.19 -2852.92 6.23 5975037.52 616164.45 N 70.34057348 W 149.05730416
10437.86 85.96 171.21 4998.18 5060.00 6082.55 24568.17 6193.20 -5499.07 -2848.85 8.73 5975006.71 616169.01 N 70.34048913 W 149.05727099
10470.16 86.27 168.54 5000.37 5062.19 6111.35 24600.40 6218.79 -5530.79 -2843.18 8.30 5974975.09 616175.18 N 70.34040247 W 149.05722493
10502.30 86.44 168.42 5002.42 5064.24 6139.65 24632.47 6243.84 -5562.22 -2836.78 0.65 5974943.77 616182.08 N 70.34031662 W 149.05717286
10534.35 86.44 163.62 5004.41 5066.23 6167.20 24664.46 6268.01 -5593.25 -2829.05 14.95 5974912.86 616190.30 N 70.34023185 W 149.05711008
10566.59 86.03 160.47 5006.52 5068.34 6193.71 24696.63 6290.89 -5623.85 -2819.13 9.83 5974882.43 616200.70 N 70.34014827 W 149.05702953
10598.64 88.95 162.39 5007.93 5069.75 6219.90 24728.64 6313.49 -5654.20 -2808.94 10.90 5974852.25 616211.37 N 70.34006537 W 149.05694672
10630.90 90.25 161.48 5008.15 5069.97 6246.45 24760.90 6336.54 -5684.87 -2798.94 4.92 5974821.75 616221.86 N 70.33998160 W 149.05686546
10663.30 92.55 159.88 5007.36 5069.18 6272.70 24793.29 6359.27 -5715.43 -2788.22 8.65 5974791.36 616233.06 N 70.33989811 W 149.05677843
10693.96 92.59 158.32 5005.99 5067.81 6297.02 24823.92 6380.24 -5744.04 -2777.29 5.08 5974762.93 616244.44 N 70.33981996 W 149.05668969
10725.88 93.48 155.92 5004.30 5066.12 6321.64 24855.79 6401.32 -5773.41 -2764.90 8.01 5974733.76 616257.29 N 70.33973975 W 149.05658905
10758.97 92.96 151.44 5002.44 5064.26 6345.85 24888.83 6421.75 -5803.01 -2750.26 13.61 5974704.40 616272.40 N 70.33965888 W 149.05647014
10790.66 93.20 149.81 5000.73 5062.55 6367.86 24920.48 6440.07 -5830.59 -2734.74 5.19 5974677.07 616288.36 N 70.33958357 W 149.05634412
10822.56 92.55 152.66 4999.13 5060.95 6390.27 24952.34 6458.90 -5858.51 -2719.41 9.15 5974649.40 616304.13 N 70.33950729 W 149..66
10854.65 90.80 149.15 4998.20 5060.02 6412.69 24984.41 6477.80 -5886.54 -2703.81 12.22 5974621.63 616320.17 N 70.33943075 W 149. 04
10886.67 89.29 147.09 4998.17 5059.99 6433.94 25016.43 6495.51 -5913.73 -2686.90 7.98 5974594.72 616337.50 N 70.33935649 W 149.05595577
10918.44 88.81 148.37 4998.70 5060.52 6454.86 25048.20 6513.00 -5940.58 -2669.94 4.30 5974568.13 616354.89 N 70.33928313 W 149.05581808
10948.42 88.78 148.32 4999.33 5061.15 6474.84 25078.17 6529.87 -5966.10 -2654.21 0.19 5974542.87 616371.02 N 70.33921345 W 149.05569038
10981.62 89.22 149.86 4999.91 5061.73 6497.29 25111.36 6549.01 -5994.58 -2637.16 4.82 5974514.67 616388.52 N 70.33913566 W 149.05555196
11013.54 89.60 150.61 5000.24 5062.06 6519.34 25143.28 6568.04 -6022.28 -2621.32 2.63 5974487.22 616404.80 N 70.33905998 W 149.05542331
11044.78 89.70 151.74 5000.43 5062.25 6541.29 25174.52 6587.17 -6049.65 -2606.25 3.63 5974460.10 616420.29 N 70.33898523 W 149.05530104
11078.32 90.22 151.73 5000.45 5062.27 6565.08 25208.06 6608.07 -6079.19 -2590.37 1.55 5974430.81 616436.64 N 70.33890454 W 149.05517209
11109.30 89.60 151.50 5000.50 5062.32 6587.02 25239.04 6627.42 -6106.45 -2575.64 2.13 5974403.80 616451.80 N 70.33883010 W 149.05505252
11140.35 91.25 152.08 5000.27 5062.09 6609.07 25270.09 6646.97 -6133.81 -2560.97 5.63 5974376.68 616466.90 N 70.33875537 W 149.05493337
11173.00 91.11 150.01 4999.60 5061.42 6631.95 25302.73 6667.28 -6162.37 -2545.17 6.35 5974348.37 616483.16 N 70.33867735 W 149.05480508
11204.30 90.43 150.59 4999.18 5061.00 6653.59 25334.03 6686.54 -6189.56 -2529.66 2.86 5974321.44 616499.09 N 70.33860310 W 149.05467920
11236.17 90.49 151.58 4998.92 5060.74 6675.95 25365.90 6706.58 -6217.45 -2514.25 3.11 5974293.79 616514.94 N 70.33852691 W 149.05455410
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Sld( d031 rt-546 ) S-213\S-213\S-213AL2\S-213AL2 Generated 3/7/2005 1 :01 PM Page 6 of 7
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude I
Depth Section Departure
(It) (deg) (deg) (It) (It) (It) (It) ( It) (It) (It) (deg/100 It) (ltUS) (ltUS)
11269.91 90.84 150.52 4998.53 5060.35 6699.60 25399.64 6727.87 -6246.97 -2497.92 3.31 5974264.54 616531.74 N 70.33844627 W 149.05442153
11301.29 90.46 150.96 4998.17 5059.99 6721.48 25431.01 6747.64 -6274.35 -2482.58 1.85 5974237.41 616547.50 N 70.33837150 W 149.05429703
11332.36 89.77 150.55 4998.11 5059.93 6743.14 25462.08 6767.31 -6301 .46 -2467.40 2.58 5974210.55 616563.11 N 70.33829745 W 149.05417380
11365.80 89.98 148.46 4998.18 5060.00 6765.93 25495.52 6788.00 -6330.27 -2450.44 6.28 5974182.01 616580.53 N 70.33821875 W 149.05403606
11397.08 90.15 147.97 4998.15 5059.97 6786.73 25526.80 6806.89 -6356.86 -2433.96 1.66 5974155.69 616597.43 N 70.33814613 W 149.05390232
11429.70 89.36 148.18 4998.29 5060.11 6808.36 25559.42 6826.63 -6384.54 -2416.71 2.51 5974128.29 616615.11 N 70.33807051 W 149.05376230
11461.72 89.05 146.70 4998.73 5060.55 6829.32 25591.44 6845.82 -6411.53 -2399.48 4.72 5974101.58 616632.77 N 70.33799681 W 149.05362243
11494.10 88.57 145.16 4999.40 5061.22 6849.86 25623.81 6864.62 -6438.34 -2381.34 4.98 5974075.06 616651.32 N 70.33792357 W 149.05347524
11525.92 87.68 147.08 5000.44 5062.26 6870.13 25655.62 6883.28 -6464.74 -2363.62 6.65 5974048.95 616669.47 N 70.33785146 W 149.05333134
11557.85 88.30 145.64 5001.56 5063.38 6890.56 25687.53 6902.21 -6491.31 -2345.94 4.91 5974022.67 616687.56 N 70.33777890 W 149.05318786
11590.36 88.95 145.90 5002.34 5064.16 6911.12 25720.03 6921.32 -6518.18 -2327.66 2.15 5973996.09 616706.27 N 70.33770550 W 149.05303947
11621.43 88.23 147.11 5003.11 5064.93 6931.07 25751.09 6939.99 -6544.08 -2310.52 4.53 5973970.47 616723.81 N 70.33763476 W 149.0.4
11653.24 88.68 146.85 5003.97 5065.79 6951.69 25782.89 6959.41 -6570.75 -2293.19 1.63 5973944.08 616741.56 N 70.33756193 W 149.0 9
11685.94 89.43 148.50 5004.51 5066.33 6973.20 25815.58 6979.78 -6598.37 -2275.71 5.54 5973916.74 616759.48 N 70.33748647 W 149.05261779
11717.10 90.56 148.99 5004.51 5066.33 6994.13 25846.74 6999.73 -6625.01 -2259.54 3.95 5973890.37 616776.07 N 70.33741371 W 149.05248657
11748.70 89.64 147.74 5004.45 5066.27 7015.20 25878.34 7019.89 -6651.91 -2242.97 4.91 5973863.73 616793.06 N 70.33734023 W 149.05235204
11780.95 88.71 147.42 5004.92 5066.74 7036.38 25910.59 7040.20 -6679.13 -2225.68 3.05 5973836.79 616810.78 N 70.33726588 W 149.05221172
11813.45 89.70 147.59 5005.37 5067.19 7057.68 25943.08 7060.73 -6706.54 -2208.22 3.09 5973809.66 616828.67 N 70.33719101 W 149.05207003
11845.57 90.12 147.60 5005.42 5067.24 7078.78 25975.20 7081.15 -6733.66 -2191.01 1.31 5973782.83 616846.31 N 70.33711694 W 149.05193031
11877.41 89.16 149.04 5005.62 5067.44 7099.99 26007.04 7101.78 -6760.76 -2174.29 5.44 5973756.00 616863.46 N 70.33704294 W 149.05179460
11910.10 89.46 148.35 5006.01 5067.83 7121.93 26039.73 7123.21 -6788.68 -2157.30 2.30 5973728.35 616880.88 N 70.33696666 W 149.05165675
11942.35 89.60 149.62 5006.28 5068.10 7143.69 26071.98 7144.56 -6816.32 -2140.69 3.96 5973700.98 616897.93 N 70.33689116 W 149.05152188
11973.71 88.92 150.49 5006.68 5068.50 7165.28 26103.33 7165.83 -6843.49 -2125.03 3.52 5973674.07 616914.01 N 70.33681695 W 149.05139484
12006.09 89.09 148.50 5007.24 5069.06 7187.34 26135.71 7187.64 -6871 .38 -2108.60 6.17 5973646.44 616930.88 N 70.33674076 W 149.05126146
Last MWD+IFR+MS 12041.37 90.05 148.53 5007.51 5069.33 7210.94 26170.99 7211.04 -6901.47 -2090.18 2.72 5973616.65 616949.78 N 70.33665858 W 149.05111191
TO ( Projected) 12100 90.05 148.53 5007.46 5069.28 7250.16 26229.62 7250.16 -6951.48 -2059.57 0 5973567.14 616981.18 N 70.33652200 W 149.05086350
Survey Type: Definitive Survey
NOTES: MWD + IFR : AK - ( MWD + IFR [Alaska] -- In-field referenced MWD in Alaska. Model takes account of increased violence of magnetic field disturbances in Alaska.
Assumes a BHA sag correction is applied to enhance inclination accuracy. ) .
MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is applied to enhance inclination accuracy. )
Leqal Description: Northinq (V) rHUS] Eastinq (X) rHUS]
Surface: 4346 FSL 4500 FEL S35 T12N R12E UM 5980549.84 618929.96
Tie-In: 4346 FSL 4500 FEL S35 T12N R12E UM 5980549.89 618929.86
BHL: 2674 FSL 1289 FEL 83 T11 N R12E UM 5973567.14 616981.18
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 )
S-213\S-213\8-213AL2\S-213AL2
Generated 3/7/2005 1 :01 PM Page 7 of 7
SCHLUMBERGER
Survey report
Client.... ............. ..: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . . .: Polaris
Well. . . . . . . . . . . . . . . . . . . . .: S-213AL2
API number..... ..........: 50-029-22993-62
Engineer.................: St. Amour
Rig:.....................: Doyon 16
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions... ..: Minimum curvature
Method for DLS. ..........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference.... ......: Driller's Pipe tally
GL above permanent..... ..: 35.90 ft
KB above permanent... ....: N/A Top Drive ft
DF above permanent..... ..: 61.82 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-) .... ....: -999.25 ft
Azimuth from rotary table to target: 237.40 degrees
[(c)2005 IDEAL ID8_1C_02J
8-Feb-2005 17:45:02
Spud date................:
Last survey date.........:
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
Page
1 of 10
23-Nov-04
08-Feb-05
263
0.00 ft
12100.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2004
Magnetic date............: 03-Jan-2005
Magnetic field strength..: 1152.29 HCNT
Magnetic dec (+E/W-).....: 24.78 degrees
Magnetic dip.............: 80.85 degrees
----- MWD survey Reference
Reference G... ...........:
Reference H. . . . . . . . . . . . . . :
Reference Dip...... ......:
Tolerance of G......... ..:
Tolerance of H...........:
Tolerance of Dip.. .......:
Criteria ---------
1002.68 mGal
1152.29 HCNT
80.85 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
.
----- Corrections ---------------------------
Magnetic dec (+E/W-)... ..: 24.78 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 24.78 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
~ DL/-~¿~
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
Page
2 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
1
2
3
4
5
0.00
155.42
233.49
327.03
415.75
6
7
8
9
10
509.99
602.31
694.94
787.96
883.26
11
12
13
14
15
976.53
1069.16
1160.63
1253.35
1347.39
16
17
18
19
20
1439.53
1534.40
1630.00
1723.15
1814.13
21
22
23
24
25
1863.71
1907.37
2000.61
2095.16
2187.42
26
27
28
29
30
2282.02
2375.30
2469.73
2503.22
2532.82
0.00
0.08
0.19
0.28
0.46
0.27
0.35
0.40
0.15
0.36
0.43
0.53
0.56
0.77
1. 25
1. 80
1. 41
0.74
2.46
6.28
6.40
6.39
6.09
5.63
5.36
5.13
7.07
12.17
14.39
15.76
297.52
297.52
189.70
217.18
188.45
140.23
13 6.82
110.75
142.58
98.80
98.44
98.28
78.60
70.45
70.29
76.02
74.91
66.98
259.23
254.60
256.71
253.07
240.31
239.01
237.61
235.24
239.64
244.54
244.19
243.38
[(c)2005 IDEAL ID8_1C_02]
0.00
155.42
78.07
93.54
88.72
94.24
92 .32
92.63
93.02
95.30
93.27
92.63
91.47
92.72
94.04
92.14
94.87
95.60
93.15
90.98
49.58
43.66
93.24
94.55
92.26
94.60
93.28
94.43
33.49
29.60
0.00
155.42
233.49
327.03
415.75
509.99
602.30
694.93
787.95
883.25
976.52
1069.14
1160.61
1253.32
1347.35
1439.46
1534.29
1629.87
1723.00
1813.70
1862.97
1906.36
1999.05
2093.11
2184.95
2279.15
2371.90
2464.97
2497.56
2526.14
0.06
0.11
0.23
0.54
0.98
1. 20
1.12
0.88
0.67
0.44
-0.04
-0.63
-1. 37
-2.40
-4.01
-6.36
-8.89
-10.62
-9.36
-2.79
2.41
7.05
16.98
26.63
35.46
44.11
54.01
69.70
77.34
84.99
0.05
0.10
-0.00
-0.34
-0.86
-1. 41
-1. 78
-2.10
-2.31
-2.46
-2.55
-2.67
-2.64
-2.34
-1. 78
-1. 09
-0.43
0.12
-0.02
-1. 71
-3.06
-4.33
-8.29
-13.16
-17 . 80
-22.58
-27.86
-35.08
-38.41
-41.81
-0.10
-0.20
-0.27
-0.43
-0.61
-0.53
-0.20
0.30
0.68
1. 05
1. 69
2.45
3.31
4.34
5.90
8.25
10.83
12.53
11.12
4.40
-0.90
-5.60
-14.86
-23.19
-30.71
-37.91
-46.29
-60.30
-67.24
-74.14
0.11
0.22
0.27
0.55
1. 06
1. 50
1. 79
2.12
2.41
2.67
3.06
3.62
4.23
4.93
6.17
8.33
10.83
12.53
11.12
4.72
3.19
7.08
17.01
26.66
35.49
44.13
54.03
69.77
77.44
85.12
296.57
297.04
269.51
231.93
215.45
200.55
186.27
171.86
163.66
156.87
146.57
137.38
128.56
118.33
106.81
97.56
92.28
89.47
90.11
111.22
196.41
232.26
240.83
240.42
239.90
239.22
238.96
239.81
240.26
240.58
DLS
(deg/
100f)
0.00
0.05
0.29
0.15
0.29
0.37
0.09
0.19
0.31
0.29
0.08
0.11
0.21
0.25
0.51
0.62
0.41
0.72
3.42
4.21
0.53
0.93
1. 52
0.51
0.33
0.33
2.14
5.47
6.63
4.68
------
------
Srvy Tool
tool Carr
type (deg)
------
------
TIP None
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
.
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
.
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
Page
3 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
31
32
33
34
35
2562.81
2591.90
2628.07
2655.84
2686.92
36
37
38
39
40
2718.71
2749.91
2798.38
2856.54
2909.66
41
42
43
44
45
3006.92
3102.80
3199.21
3295.21
3392.93
46
47
48
49
50
3488.29
3584.58
3680.92
3776.78
3873.18
51
52
53
54
55
3968.74
4064.79
4160.95
4257.35
4348.86
56
57
58
59
60
4446.91
4545.83
4641. 52
4737.67
4831. 97
17.56
19.43
19.93
20.53
21. 45
22.14
23.21
24.47
26.47
29.58
33.61
37.72
41. 06
43.34
45.61
44.79
45.23
44.69
45.06
44.60
44.05
43.64
43.86
43.42
43.94
43.12
44.42
44.65
43.99
43.63
242.48
241.38
240.84
241. 04
241.15
240.27
238.46
236.38
236.45
236.00
231.80
227.46
226.91
232.11
237.12
237.13
235.98
235.88
236.81
236.48
237.25
237.36
238.30
238.37
237.59
237.35
236.52
236.80
236.28
236.15
[(c)2005 IDEAL ID8_1C_02]
29.99
29.09
36.17
27.77
31.08
31.79
31.20
48.47
58.16
53.12
97.26
95.88
96.41
96.00
97.72
95.36
96.29
96.34
95.86
96.40
95.56
96.05
96.16
96.40
91. 51
98.05
98.92
95.69
96.15
94.30
2554.87
2582.46
2616.52
2642.57
2671.59
2701.11
2729.90
2774.23
2826.74
2873.62
2956.46
3034.35
3108.85
3179.99
3249.73
3316.92
3385.00
3453.17
3521.10
3589.47
3657.83
3727.11
3796.57
3866.33
3932.51
4003.60
4075.03
4143.24
4212.03
4280.08
93.55
102.75
114.90
124.49
135.60
147.38
159.40
178.99
203.99
228.94
279.76
335.09
395.29
459.12
527.46
595.12
663.21
731.27
798.89
866.84
933.61
1000.14
1066.64
1133.16
1196.35
1263.88
1332.31
1399.41
1466.58
1531.85
-45.73
-50.08
-55.96
-60.62
-66.01
-71.78
-77.91
-88.47
-102.30
-116.18
-146.27
-182.53
-224.11
-265.90
-305.47
-342.20
-379.73
-417.86
-455.34
-492.71
-529.21
-565.15
-600.55
-635.48
-668.99
-81.80
-89.94
-100.60
-109.00
-118.74
-129.03
-139.38
-155.88
-176.72
-197.46
-238.53
-281.02
-325.89
-374.94
-430.75
-487.57
-544.39
-600.78
-657.08
-713.85
-769.76
-825.75
-882.04
-938.66
-992.25
-705.30 -1049.18
-742.64 -1106.52
-779.52 -1162.59
-816.56 -1218.63
-852.86 -1272.89
93.71
102.94
115.12
124.72
135.85
147.66
159.68
179.24
204.19
229.10
279.81
335.10
395.51
459.65
528.07
595.67
663.75
731.81
799.44
867.38
934.13
1000.63
1067.08
1133.54
1196.70
1264.21
1332.63
1399.74
1466.91
1532.19
240.79
240.89
240.91
240.92
240.93
240.91
240.80
240.42
239.93
239.53
238.48
237.00
235.48
234.66
234.66
234.94
235.10
235.18
235.28
235.39
235.49
235.61
235.75
235.90
236.01
236.09
236.13
236.16
236.18
236.18
DLS
(degl
100f)
6.06
6.54
1. 47
2.17
2.96
2.40
4.09
3.12
3.44
5.87
4.72
5.03
3.48
4.34
4.28
0.86
0.96
0.57
0.79
0.53
0.81
0.43
0.71
0.46
0.82
0.85
1.44
0.32
0.78
0.39
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_Inc_Only
.
MWD_Inc_Only
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
--------
--------
Seq Measured
# depth
(ft)
------
------
Incl
angle
(deg)
-------
-------
Azimuth
angle
(deg)
------
------
Course
length
(ft)
--------
--------
TVD
depth
(ft)
8-Feb-2005 17:45:02
--------
--------
----------------
----------------
Page
4 of 10
---------------
---------------
Total
displ
(ft)
At
Azim
(deg)
DLS
(degl
100f)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
hole
77
78
79
80
81
82
83
84
85
86
87
88
89
90
4928.03
5023.20
5119.83
5216.82
5313.24
5409.71
5505.37
5602.48
5697.64
5793.44
5889.06
5985.53
6079.45
6108.00
6120.00
6138.00
6150.44
6182.64
6214.86
6246.66
6278.79
6310.73
6342.35
6374.53
6406.60
6438.86
6468.38
6502.04
6533.70
6565.97
44.71
44.27
43.93
44.04
44.17
43.74
45.59
48.31
51. 38
54.39
57.95
61. 01
65.32
66.72
68.58
68.58
71.83
75.37
79.31
81. 05
82.19
86.40
87.99
88.81
92.23
93.70
96.37
100.67
101.58
100.82
235.59
235.98
235.90
234.58
235.63
235.73
235.49
234.89
233.90
235.09
233.06
230.89
228.53
228.09
227.58
227.58
227.70
228.20
229.00
229.80
230.68
231.48
230.96
227.00
225.75
225.64
223.07
221.71
222.49
220.73
[(c)2005 IDEAL ID8_1C_02]
96.06
95.17
96.63
96.99
96.42
96.47
95.66
97.11
95.16
95.80
95.62
96.47
93.92
28.55
12.00
18.00
12.44
32.20
32.22
31. 80
32.13
31. 94
31.62
32.18
32.07
32.26
29.52
33.66
31.66
32.27
4348.98
4416.87
4486.27
4556.05
4625.29
4694.74
4762.77
4829.06
4890.42
4948.22
5001.45
5050.44
5092.83
5104.43
5109.00
5115.57
5119.78
5128.87
5135.93
5141.35
5146.04
5149.21
5150.76
5151.66
5151.37
5149.70
5147.11
5142.12
5136.01
5129.74
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
1598.75
1665.42
1732.64
1799.95
1867.00
-890.42
-927.92
-965.58
-1003.98
-1042.37
-1328.29
-1383.44
-1439.15
-1494.49
-1549.53
1933.93 -1080.12 -1604.83
2001.14 -1118.10 -1660.32
2072.04 -1158.62 -1718.57
2144.66 -1200.97 -1777.69
2220.95 -1245.31 -1839.88
2300.22 -1291.93 -1904.17
2382.94 -1343.13 -1969.60
2465.96 -1397.33 -2033.48
2491.71 -1414.68 -2052.96
2502.66 -1422.13 -2061.19
2519.17 -1433.44 -2073.56
2530.70 -1441.32 -2082.21
2561.17 -1462.01 -2105.14
2592.23 -1482.79 -2128.72
2623.26 -1503.18 -2152.51
2654.79 -1523.51 -2176.94
2686.38 -1543.47 -2201.67
2717.77 -1563.25 -2226.29
2749.59 -1584.36 -2250.55
2781.06 -1606.48 -2273.76
2812.60 -1628.98 -2296.81
2841.25 -1650.00 -2317.37
2873.39 -1674.58 -2339.81
2903.36 -1697.63 -2360.63
2933.82 -1721.30 -2381.65
1599.13
1665.82
1733.06
1800.41
1867.50
1934.46
2001.70
2072.65
2145.34
2221. 70
2301.07
2383.97
2467.31
2493.19
2504.19
2520.79
2532.39
2563.02
2594.25
2625.42
2657.10
2688.80
2720.31
2752.30
2784.02
2815.84
2844.77
2877.31
2907.67
2938.56
236.16
236.15
236.14
236.11
236.07
236.06
236.04
236.01
235.96
235.91
235.84
235.71
235.50
235.43
235.40
235.34
235.31
235.22
235.14
235.07
235.01
234.97
234.92
234.85
234.76
234.65
234.55
234.41
234.28
234.14
1. 20
0.54
0.36
0.95
0.77
0.45
1. 94
2.84
3.32
3.29
4.12
3.72
5.11
5.10
15.99
0.00
26.14
11. 09
12.47
6.01
4.46
13 .41
5.29
12.56
11. 35
4.57
12.53
13.38
3.76
5.85
-----
------
------
Srvy Tool
tool Corr
type ( deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_BLIND_TOW
MWD_BLIND_BOW
MWD_BLIND_Rat
INC+TREND
INC+TREND
INC+TREND
INC+TREND
.
MWD_Inc_Only
MWD_Inc_Only
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Page
5 of 10
Seq Measured
# depth
(ft)
--------
---
--------
91
92
93
94
95
6598.45
6629.06
6659.75
6690.19
6722.07
96
97
98
99
100
6754.46
6784.69
6816.88
6848.95
6881.60
101
102
103
104
105
6912.65
6944.79
6977.36
7008.85
7041. 24
106
107
108
109
110
7073.30
7105.18
7137.41
7169.85
7200.90
111
112
113
114
115
7233.68
7266.09
7297.76
7329.43
7361.41
116
117
118
119
120
7393.80
7425.82
7457.86
7489.42
7521. 64
Incl
angle
(deg)
------
------
98.52
96.71
94.06
92.72
92.79
93.00
93.27
92.11
91. 45
91.15
92.07
92.14
91. 83
92.83
96.89
97.79
97.75
97.86
97.72
97.58
95.47
92.35
91. 87
92.00
91.42
90.73
90.22
88.61
88.33
91.15
Azimuth
angle
(deg)
-------
-------
219.01
216.76
213.83
211.66
209.78
208.34
205.71
202.50
198.89
196.22
192.41
192.20
191.15
190.97
190.14
189.70
188.84
189.18
190.62
189.79
188.81
189.31
190.78
189.67
190.44
189.47
188.59
191. 98
193.64
195.96
[(c)2005 IDEAL ID8_1C_02]
Course
length
(ft)
------
------
32.48
30.61
30.69
30.44
31. 88
32.39
30.23
32.19
32.07
32.65
31.05
32.14
32.57
31. 49
32.39
32.06
31.88
32.23
32.44
31.05
32.78
32.41
31. 67
31.67
31. 98
32.39
32.02
32.04
31.56
32.22
TVD
depth
(ft)
--------
--------
5124.29
5120.23
5117.35
5115.55
5114.02
5112.38
5110.73
5109.22
5108.22
5107.48
5106.61
5105.43
5104.30
5103.02
5100.28
5096.18
5091.87
5087.49
5083.10
5078.96
5075.24
5073.03
5071.86
5070.79
5069.84
5069.23
5068.96
5069.29
5070.13
5070.28
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
--------
--------
----------------
----------------
2964.34 -1745.87 -2402.18
2992.94 -1769.81 -2420.80
3021.24 -1794.75 -2438.45
3048.85 -1820.31 -2454.89
3077.30 -1847.68 -2471.15
3105.78 -1875.95 -2486.87
3131.81 -1902.84 -2500.58
3158.69 -1932.19 -2513.71
3184.38 -1962.17 -2525.04
3209.44 -1993.29 -2534.88
3232.10 -2023.35 -2542.55
3254.78 -2054.74 -2549.40
3277.50 -2086.61 -2555.98
3299.22 -2117.49 -2562.02
3321.29 -2149.21 -2567.93
3342.78 -2180.53 -2573.41
3363.87 -2211.71 -2578.50
3385.07 -2243.24 -2583.50
3406.78 -2274.91 -2589.02
3427.69 -2305.19 -2594.48
3449.44 -2337.33 -2599.74
3470.93 -2369.26 -2604.83
3492.37 -2400.42 -2610.35
3513.89 -2431.57 -2615.97
3535.55 -2463.04 -2621.55
3557.45 -2494.94 -2627.15
3578.72 -2526.56 -2632.17
3600.52 -2558.08 -2637.89
3622.98 -2588.84 -2644.89
3646.70 -2619.99 -2653.12
Total
displ
(ft)
At
Azim
(deg)
---------------
---------------
2969.60
2998.76
3027.73
3056.14
3085.53
3115.08
3142.24
3170.50
3197.80
3224.72
3249.39
3274.35
3299.55
3323.81
3348.64
3373.00
3397.10
3421. 49
3446.48
3470.62
3495.96
3521.15
3546.26
3571.53
3597.10
3623.07
3648.54
3674.54
3701.02
3728.72
233.99
233.83
233.65
233.44
233.21
232.97
232.73
232.45
232.15
231. 82
231.49
231.13
230.77
230.43
230.07
229.72
229.38
229.03
228.70
228.38
228.04
227.71
227.40
227.09
226.79
226.48
226.17
225.88
225.61
225.36
DLS
(deg/
100f)
8.80
9.38
12.84
8.37
5.89
4.49
8.73
10.59
11.44
8.23
12.62
0.69
3.36
3.23
12.79
3.12
2.68
1.10
4.42
2.69
7.09
9.75
4.88
3.53
3.01
3.67
3.18
11.71
5.33
11.33
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
Page
6 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seg Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
DLS
(deg/
100f)
------
------
Srvy Tool
tool Corr
type (deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
121
122
123
124
125
7554.02
7585.90
7618.48
7650.40
7681.96
126
127
128
129
130
7714.43
7745.65
7777.89
7810.83
7842.55
131
132
133
134
135
7874.28
7906.85
7937.02
7969.17
8001. 3 6
136
137
138
139
140
8033.59
8065.20
8097.62
8129.55
8160.69
141
142
143
144
145
8194.13
8225.94
8256.46
8289.35
8321.05
146
147
148
149
150
8352.54
8385.04
8417.19
8449.25
8481.49
93.65
93.48
94.44
95.78
94.72
93.41
92.24
89.91
89.77
90.53
90.67
91. 04
88.85
87.82
88.50
88.74
89.19
90.22
90.97
91. 80
91.93
91. 80
91. 52
91. 45
91. 93
92.28
91. 80
91. 32
91. 32
91. 01
199.17
201.10
201.43
201. 59
201.50
202.55
200.95
201.71
201. 74
200.90
200.98
198.91
198.37
197.70
195.87
193.70
190.43
187.55
185.69
185.95
183.21
182.51
181.64
180.55
177.16
179.57
180.08
179.87
178.98
180.07
[(c)2005 IDEAL ID8_1C_02]
32.38
31.88
32.58
31. 92
31.56
32.47
31.22
32.24
32.94
31.72
31. 73
32.57
30.17
32.15
32.19
32.23
31. 61
32.42
31. 93
31.14
33.44
31.81
30.52
32.89
31.70
31. 49
32.50
32.15
32.06
32.24
5068.92
5066.94
5064.69
5061.85
5058.96
5056.66
5055.12
5054.52
5054.61
5054.52
5054.19
5053.71
5053.74
5054.67
5055.70
5056.48
5057.05
5057.22
5056.89
5056.13
5055.05
5054.01
5053.13
5052.27
5051.34
5050.18
5049.03
5048.15
5047.41
5046.76
3671.53 -2650.82 -2662.88
3696.85 -2680.70 -2673.83
3723.10 -2710.98 -2685.62
3748.86 -2740.56 -2697.27
3774.33 -2769.79 -2708.82
3800.74 -2799.82 -2720.96
3826.08 -2828.78 -2732.52
3852.13 -2858.80 -2744.24
3878.89 -2889.40 -2756.43
3904.52 -2918.95 -2767.96
3930.04 -2948.58 -2779.30
3955.89 -2979.20 -2790.41
3979.42 -3007.78 -2800.05
4004.26 -3038.34 -2810.00
4028.68 -3069.14 -2819.29
4052.39 -3100.29 -2827.52
4074.61 -3131.19 -2834.12
4096.13 -3163.21 -2839.19
4116.31 -3194.92 -2842.87
4135.66 -3225.89 -2846.02
4155.85 -3259.21 -2848.69
4174.30 -3290.96 -2850.28
4191.65 -3321.45 -2851.38
4209.89 -3354.32 -2852.01
4226.43 -3385.99 -2851.38
4242.62 -3417.45 -2850.48
4260.03 -3449.93 -2850.38
4277.33 -3482.07 -2850.37
4294.33 -3514.11 -2850.05
4311.47 -3546.35 -2849.78
3757.36
3786.22
3816.02
3845.25
3874.20
3904.18
3933.02
3962.78
3993.31
4022.67
4052.00
4081.91
4109.39
4138.55
4167.50
4196.03
4223.34
4250.52
4276.61
4301.89
4328.68
4353.68
4377.49
4402.89
4426.66
4450.19
4475.12
4499.93
4524.57
4549.48
225.13
224.93
224.73
224.54
224.36
224.18
224.01
223.83
223.65
223.48
223.31
223.13
222.95
222.76
222.57
222.37
222.15
221.91
221.66
221. 42
221.15
220.90
220.65
220.37
220.10
219.83
219.56
219.30
219.04
218.78
12.56
6.07
3.12
4.23
3.37
5.17
6.34
7.60
0.43
3.57
0.51
6.46
7.48
3.82
6.06
6.77
10.44
9.43
6.28
2.79
8.20
2.24
2.99
3.32
10.80
7.73
2.15
1. 63
2.78
3.51
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Page
7 of 10
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(de g)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
151
152
153
154
155
8513.50
8545.30
8577.72
8609.74
8641.86
156
157
158
159
160
8674.80
8706.84
8738.52
8771.04
8802.98
161
162
163
164
165
8834.85
8867.43
8899.58
8931.45
8963.82
166
167
168
169
170
8995.67
9027.75
9059.92
9092.28
9124.46
171
172
173
174
175
9156.22
9188.52
9219.76
9252.17
9282.98
176
177
178
179
180
9313.66
9340.22
9375.15
9405.18
9436.08
90.94
90.60
91. 01
90.73
90.91
90.97
91. 80
92.38
92.38
91. 04
90.70
90.77
90.60
90.90
90.29
89.02
89.26
89.77
90.19
90.46
90.01
89.84
89.91
89.91
89.84
89.09
88.71
89.16
87.96
87.95
179.71
179.89
179.03
178 . 89
178 . 44
179.59
177.01
177.90
177.97
177.92
176.87
178 . 02
176.95
177.73
176.97
179.89
179.27
181. 82
182.92
182.08
182.23
182.80
181.77
181.91
182.31
181.27
182.24
180.79
180.62
180.46
[(c)2005 IDEAL ID8_1C_02]
32.01
31.80
32.42
32.02
32.12
32.94
32.04
31. 68
32.52
31. 94
31. 87
32.58
32.15
31.87
32.37
31. 85
32.08
32.17
32.36
32.18
31. 76
32.30
31. 24
32.41
30.81
30.68
26.56
34.93
30.03
30.90
5046.21
5045.78
5045.33
5044.84
5044.38
5043.84
5043.07
5041.91
5040.56
5039.61
5039.12
5038.71
5038.32
5037.91
5037.57
5037.76
5038.24
5038.52
5038.53
5038.34
5038.21
5038.26
5038.32
5038.38
5038.44
5038.73
5039.24
5039.89
5040.64
5041. 75
4328.66 -3578.35 -2849.72
4345.70 -3610.15 -2849.61
4362.91 -3642.56 -2849.30
4379.67 -3674.57 -2848.72
4396.33 -3706.68 -2847.97
4413.60 -3739.61 -2847.41
4430.05 -3771.63 -2846.46
4445.90 -3803.25 -2845.05
4462.41 -3835.72 -2843.88
4478.63 -3867.63 -2842.73
4494.56 -3899.46 -2841.29
4510.87 -3932.01 -2839.83
4526.99 -3964.12 -2838.42
4542.89 -3995.95 -2836.94
4559.05 -4028.29 -2835.45
4575.47 -4060.12 -2834.57
4592.55 -4092.20 -2834.34
4610.14 -4124.36 -2834.65
4628.69 -4156.69 -2835.98
4647.19 -4188.84 -2837.39
4665.29 -4220.58 -2838.58
4683.87 -4252.85 -2840.00
4701.74 -4284.06 -2841.24
4720.07 -4316.46 -2842.28
4737.61 -4347.25 -2843.42
4754.94 -4377.91 -2844.38
4769.93 -4404.45 -2845.19
4789.51 -4439.36 -2846.11
4806.00 -4469.38 -2846.48
4822.88 -4500.26 -2846.77
4574.44
4599.29
4624.58
4649.48
4674.44
4700.26
4725.19
4749.64
4774.98
4799.97
4824.80
4850.29
4875.54
4900.60
4926.14
4951.71
4977.91
5004.56
5031.99
5059.36
5086.34
5113.93
5140.61
5168.21
5194.57
5220.78
5243.50
5273.36
5298.85
5325.08
218.53
218.29
218.03
217.78
217.54
217.29
217.04
216.80
216.55
216.32
216.08
215.84
215.60
215.37
215.14
214.92
214.71
214.50
214.30
214.11
213.92
213.73
213 .55
213.36
213 .19
213.01
212.86
212.66
212.49
212.32
DLS
(deg/
100f)
1.15
1.21
2.94
0.98
1. 51
3.50
8.46
3.35
0.22
4.20
3.46
3.54
3.37
2.62
3.01
10.00
2.07
8.08
3.64
2.74
1. 49
1. 84
3.30
0.43
1. 32
4.18
3.92
4.35
4.04
0.52
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
Page
8 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
181
182
183
184
185
9466.74
9498.04
9528.45
9559.69
9590.16
186
187
188
189
190
9621.40
9652.71
9683.01
9713.96
9744.82
191
192
193
194
195
9775.44
9806.19
9836.19
9867.07
9897.95
196
197
198
199
200
9929.20
9959.60
9990.64
10022.57
10054.74
201
202
203
204
205
10087.10
10118.28
10151.06
10182.44
10215.15
206
207
208
209
210
10246.72
10278.77
10310.79
10342.87
10374.76
86.79
86.51
88.13
88.78
88.51
88.23
89.94
90.05
89.91
89.81
90.22
89.77
90.49
91.35
91. 32
91. 08
90.87
89.19
89.26
89.67
89.67
89.88
89.36
86.89
86.34
86.41
87.10
88.61
90.60
88.23
180.31
182.37
182.38
183.96
183.62
184.49
184.31
183.94
184.63
184.76
185.53
185.26
184.94
184.07
183.01
180.74
181. 02
179.00
178.60
178.69
179.71
178.56
177.38
176.19
175.59
175.42
173.18
173.46
175.73
175.28
[(c)2005 IDEAL ID8_1C_02]
30.66
31.30
30.41
31. 24
30.47
31.24
31.31
30.30
30.95
30.86
30.62
30.75
30.00
30.88
30.88
31.25
30.40
31. 04
31.93
32.17
32.36
31.18
32.78
31.38
32.71
31.57
32.05
32.02
32.08
31. 89
5043.15
5044.98
5046.40
5047.25
5047.97
5048.85
5049.35
5049.36
5049.37
5049.44
5049.44
5049.44
5049.37
5048.87
5048.15
5047.50
5046.98
5046.97
5047.40
5047.70
5047.89
5048.01
5048.23
5049.25
5051.18
5053.18
5054.99
5056.19
5056.41
5056.74
Displ
+N/S-
(ft)
4839.55 -4530.88 -2846.98
4857.00 -4562.12 -2847.71
4874.41 -4592.47 -2848.97
4892.66 -4623.65 -2850.70
4910.74 -4654.04 -2852.71
4929.38 -4685.19 -2854.92
4948.22 -4716.41 -2857.32
4966.34 -4746.63 -2859.50
4984.91 -4777.49 -2861.81
5003.61 -4808.25 -2864.34
5022.36 -4838.74 -2867.08
5041.29 -4869.36 -2869.97
5059.63 -4899.24 -2872.64
5078.26 -4930.02 -2875.07
5096.46 -4960.83 -2876.97
5114.15 -4992.05 -2877.99
5130.92 -5022.45 -2878.46
5147.64 -5053.48 -2878.47
5164.28 -5085.40 -2877.80
5180.96 -5117.56 -2877.04
5198.01 -5149.92 -2876.59
5214.41 -5181.09 -2876.11
5231.08 -5213.85 -2874.95
5246.47 -5245.16 -2873.20
5262.05 -5277.73 -2870.85
5276.89 -5309.14 -2868.39
5291.37 -5340.98 -2865.21
5305.35 -5372.76 -2861.49
5320.01 -5404.69 -2858.46
5335.03 -5436.48 -2855.97
5351.09
5377.95
5404.39
5431.81
5458.76
5486.49
5514.41
5541.41
5569.06
5596.75
5624.38
5652.20
5679.31
5707.11
5734.70
5762.24
5788.83
5815.78'
5843.21
5870.84
5898.85
5925.86
5953.96
5980.55
6008.02
6034.45
6060.98
6087.25
6114.04
6141. 00
212.14
211. 97
211.81
211.66
211.51
211.36
211.21
211. 07
210.92
210.78
210.65
210.51
210.39
210.25
210.11
209.96
209.82
209.67
209.51
209.34
209.19
209.04
208.87
208.71
208.54
208.38
208.21
208.04
207.87
207.71
DLS
(deg/
100f)
3.81
6.63
5.33
5.47
1. 42
2.92
5.49
1. 27
2.27
0.53
2.85
1. 71
2.63
3.96
3.43
7.30
1.15
8.46
1.27
1. 30
3.15
3.75
3.93
8.74
2.49
0.58
7.30
4.80
9.41
7.56
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
Page
9 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
211
212
213
214
215
10406.65
10437.86
10470.16
10502.30
10534.35
216
217
218
219
220
10566.59
10598.64
10630.90
10663.30
10693.96
221
222
223
224
225
10725.88
10758.97
10790.66
10822.56
10854.65
226
227
228
229
230
10886.67
10918.44
10948.42
10981.62
11013 .54
231
232
233
234
235
11044.78
11078.32
11109.30
11140.35
11173.00
236
237
238
239
240
11204.30
11236.17
11269.91
11301.29
11332.36
86.96
85.96
86.27
86.44
86.44
86.03
88.95
90.25
92.55
92.59
93.48
92.96
93.20
92.55
90.80
89.29
88.81
88.78
89.22
89.60
89.70
90.22
89.60
91. 25
91.11
90.43
90.49
90.84
90.46
89.77
173.75
171.21
168.54
168.42
163.62
160.47
162.39
161.48
159.88
158.32
155.92
151. 44
149.81
152.66
149.15
147.09
148.37
148.32
149.86
150.61
151.74
151.73
151. 50
152.08
150.01
150.59
151.58
150.52
150.96
150.55
[(c)2005 IDEAL ID8_1C_02]
31. 89
31. 21
32.30
32.14
32.05
32.24
32.05
32.26
32.40
30.66
31. 92
33.09
31. 69
31.90
32.09
32.02
31. 77
29.98
33.20
31.92
31.24
33.54
30.98
31.05
32.65
31. 30
31.87
33.74
31. 38
31.07
5058.08
5060.01
5062.19
5064.24
5066.23
5068.35
5069.75
5069.98
5069.18
5067.81
5066.12
5064.26
5062.56
5060.96
5060.02
5059.99
5060.52
5061.15
5061.73
5062.06
5062.25
5062.27
5062.32
5062.09
5061.42
5061.00
5060.74
5060.35
5059.99
5059.93
5349.55 -5468.19 -2852.92
5362.76 -5499.07 -2848.84
5375.08 -5530.79 -2843.18
5386.61 -5562.22 -2836.77
5396.82 -5593.25 -2829.05
5404.95 -5623.85 -2819.13
5412.72 -5654.20 -2808.94
5420.81 -5684.87 -2798.93
5428.25 -5715.43 -2788.22
5434.46 -5744.05 -2777.29
5439.85 -5773.41 -2764.90
5443.46 -5803.02 -2750.26
5445.24 -5830.59 -2734.73
5447.37 -5858.52 -2719.41
5449.33 -5886.54 -2703.81
5449.73 -5913.73 -2686.90
5449.92 -5940.59 -2669.94
5450.41 -5966.10 -2654.21
5451.39 -5994.58 -2637.16
5452.97 -6022.29 -2621.31
5455.02 -6049.66 -2606.25
5457.56 -6079.20 -2590.37
5459.84 -6106.45 -2575.64
5462.21 -6133.81 -2560.97
5464.29 -6162.37 -2545.16
5465.87 -6189.56 -2529.66
5467.92 -6217.45 -2514.25
5470.07 -6246.98 -2497.92
5471.90 -6274.35 -2482.58
5473.71 -6301.46 -2467.40
6167.68
6193.20
6218.79
6243.85
6268.01
6290.89
6313.49
6336.54
6359.27
6380.24
6401.33
6421. 75
6440.08
6458.90
6477.80
6495.51
6513 .00
6529.87
6549.02
6568.05
6587.18
6608.08
6627.42
6646.97
6667.29
6686.54
6706.58
6727.88
6747.64
6767.31
207.55
207.39
207.21
207.02
206.83
206.62
206.42
206.21
206.01
205.80
205.59
205.36
205.13
204.90
204.67
204.43
204.20
203.98
203.75
203.52
203.31
203.08
202.87
202.66
202.44
202.23
202.02
201.79
201. 59
201.38
DLS
(deg/
100f)
6.23
8.73
8.30
0.65
14.95
9.83
10.90
4.92
8.65
5.08
8.01
13.61
5.19
9.15
12.22
7.98
4.30
0.19
4.82
2.63
3.63
1. 55
2.13
5.63
6.35
2.86
3.11
3.31
1. 85
2.58
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 17:45:02
Page 10 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
241
242
243
244
245
11365.80
11397.08
11429.70
11461.72
11494.10
246
247
248
249
250
11525.92
11557.85
11590.36
11621.43
11653.24
251
252
253
254
255
11685.94
11717.10
11748.70
11780.95
11813 .45
256
257
258
259
260
11845.57
11877.41
11910.10
11942.35
11973.71
261
262
263
12006.09
12041.37
12100.00
89.98
90.15
89.36
89.05
88.57
87.68
88.30
88.95
88.23
88.68
89.43
90.56
89.64
88.71
89.70
90.12
89.16
89.46
89.60
88.92
89.09
90.05
90.05
148.46
147.97
148.18
146.70
145.16
147.08
145.64
145.90
147.11
146.85
148.50
148.99
147.74
147.42
147.59
147.60
149.04
148.35
149.62
150.49
148.50
148.53
148.53
[(c)2005 IDEAL ID8_1C_02]
33.44
31.28
32.62
32.02
32.38
31.82
31.93
32.51
31.07
31.81
32.70
31.16
31. 60
32.25
32.50
32.12
31. 84
32.69
32.25
31.36
32.38
35.28
58.63
5060.00
5059.97
5060.11
5060.55
5061.23
5062.27
5063.39
5064.17
5064.93
5065.79
5066.33
5066.33
5066.28
5066.74
5067.19
5067.24
5067.44
5067.84
5068.10
5068.51
5069.07
5069.33
5069.28
5474.94 -6330.27 -2450.43
5475.39 -6356.86 -2433.96
5475.77 -6384.55 -2416.71
5475.79 -6411.53 -2399.48
5474.96 -6438.35 -2381.34
5474.25 -6464.75 -2363.61
5473.67 -6491.31 -2345.94
5472.75 -6518.18 -2327.66
5472.26 -6544.09 -2310.52
5472.03 -6570.75 -2293.19
5472.19 -6598.38 -2275.70
5472.92 -6625.01 -2259.54
5473.45 -6651.92 -2242.96
5473.55 -6679.14 -2225.68
5473.61 -6706.55 -2208.22
5473.72 -6733.66 -2191.01
5474.23 -6760.76 -2174.28
5474.97 -6788.69 -2157.30
5475.86 -6816.32 -2140.68
5477.32 -6843.50 -2125.03
5478.50 -6871.39 -2108.60
5479.19 -6901.47 -2090.17
5480.34 -6951.48 -2059.57
6788.00
6806.90
6826.63
6845.82
6864.63
6883.29
6902.21
6921. 32
6940.00
6959.41
6979.79
6999.74
7019.89
7040.21
7060.74
7081.15
7101.79
7123.22
7144.56
7165.83
7187.64
7211. 04
7250.16
201.16
200.95
200.73
200.52
200.30
200.08
199.87
199.65
199.45
199.24
199.03
198.83
198.63
198.43
198.22
198.02
197.83
197.63
197.44
197.25
197.06
196.85
196.50
DLS
(degl
100f)
6.28
1. 66
2.51
4.72
4.98
6.65
4.91
2.15
4.53
1. 63
5.54
3.95
4.91
3.05
3.09
1. 31
5.44
2.30
3.96
3.52
6.17
2.72
0.00
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFRßS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS .
MWD_IFR_MS
Projected to TD
.
~~!Æ~~ (ill} !Æ~fÆ~:~!Æ
.
AI,ASIiA. OIL AND GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay S-213AL2
BP Exploration (Alaska) Inc.
Pennit No: 204-216
Surface Location: 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM
Bottomhole Location: 2757' NSL, 1269' WEL, SEC. 03 T11N, R12E, UM (Dba)
Dear Mr. Crane:
Enclosed is the approved application for pennit to redrill the above development well.
The pennit is for a new wellbore segment of existing well PBU S-213A, Pennit No. 204-213,
API 50-029-22993-01. Production should continue to be reported as a function ofthe original
API number stated above.
This pennit to redrill does not exempt you from obtaining additional pennits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required pennits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the pennit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this pennit may
result in the revocation or suspension of the pennit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission t 'tness any required test. Contact the
Commission's petroleum field inspector at (907) 659- ager).
Chainnan
BY ORDER OF THE COMM N
DATED thisL day of er,2,,004
.V4M \0.1"
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
\Lt. C A-
v Il.(ø' l-00t
o Drill III Redrill
1a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM
Top of Productive Horizon:
2321' NSL, 1796' WEL, SEC. 34, T12N, R12E, UM (OBa)
Total Depth: 1"1/-V ~
2757' NSL, 1269' WEL, SEC. 03,~R12E, UM (OBa)
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 618930 y- 5980550 Zone- ASP4
16. Deviated Wells: Kickoff Depth: 6070 feet
Maximum Hole Angle: 93 degrees
. STATE OF ALASKA .,
ALASKA Oil AND GAS CONSERVATION COMMISSIQN
PERMIT TO DRILL
20 MC 25.005
11 b. Current Well Class 0 Exploratory . Qe1/iIOprnent 08 C\1Þl1lí1Ðpte Zone
o Stratigraphic Test 0 Service 0 Developme~ .<;3~~.;¡\J,&ingle Zone
5. Bond: a Blanket 0 Single Well 11. Well Name and'1',jumber:
Bond No. 2S100302630-277 PBU S-213~ L 2-
6. Proposed Depth: 12. Field / Pool(s):
MD 12139' TVD 5082' Prudhoe Bay Field / Polaris Pool
7. Property Designation:
ADL 028253
2 '2 2004
~
8. Land Use Permit:
13. Approximate Spud Date:
11/01/04
14. Distance to Nearest Property:
9900'
9. Acres in Property:
2560
18. Casing Program:
Size
Casinç¡
4-1/2"
Hole
6-3/4"
Weiç¡ht
12.6#
SpeqiflCätiOl1s
I
Grade Couplinç¡ Lenç¡th
L-80 IBT 6094'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 61.90' feet 500' away from S-01 at Top OA
17. Maximum Anticipated Pressures in psig (see 20 MC 25.035)
Downhole: 2312 Surface: 1807
$ètting PE:)Pt.l1
Top" , BóttOn'}
MD TVD MD TVD (includinç¡ staç¡e data)
6045' 5082' 12139' 5082' Uncemented Slotted Liner
19, PRESENT WELL CqNDITION SUMMARY (To be completed for RedrilIANCl Re'-èntry Openatiol1s)
Total D~i~~MD (ft): Total D~~2TVD (ft): l Plugs ~o~~SUred): I Effective ~2~~ MD (ft): IEffective ~~j~ TVD Junk ~o~~SUred):
Lengt1 Size
Structural
Conductor 110' 20" 260 sx Arctic Set (Approx.) 110' 110'
Surface 2831' 9-5/8" 440 sx Arcticset Lite 3, 215 sx CI 'G' 2859' 2829'
Intermediate
Production 6565' 7-5/8" 202 sx Class 'G' 6591' 5227'
Liner 5749' (OBd) 4-1/2" Uncemented Slotted Liner 6400' - 12149' 5198' - 5217'
Liner (AL 1, OBb) 5516' 4-1/2" Uncemented Slotted Liner 6634' - 12150' 5182' - 5122'
Liner (AL2, OBc) 5832' 4-1/2" Uncemented Slotted Liner 6312' - 12144' 5177' - 5172'
20. Attachments 0 Filing Fee, $100 0 BOP Sketch
o Property Plat D! Diverter Sketch
IPerfOration Depth TVD (ft):
II Drilling Program 0 Time vs Depth Plot
o Seabed Report a Drilling Fluid Program
o Shallow Hazard Analysis
a 20 MC 25.050 Requirements
Date:
Contact Michael Triolo, 564-5774
Perforation Depth MD (ft):
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Na~e L0;PII Crane J Title Senior Drilling Engineer
Signatur~,--/~4. ~~_ Phone 564-4089
L/
Permit To Drill I API Number:
Number: 20~ -.2./ -6 50- 029-22993-62-00
-Conditions of Approval: Samples Required 0 Yes ,)(NO
Hydrogen Sulfide Measures 0 YeS~NO
Other:'\€:st ÞO P E ~" i f<'; .
Appmved Bv Ut
Form 1 0-401 ReviU;~L
Prepared By Name/Number:
Date )C --22 -0'-( Sondra Stewman, 564-4750
I Permit Approval ,It /, /I I See cover letter for
Date: I//I//), other requirements
Mud Log Required 0 Yes ~o
Directional Survey Required ~ es 0 No
{'\
tJ
" ¡'.-\ " !\ J A'I L
II -, ~ \
i'U ¡'.. .
APPROVED BY
THE COMMISSION
Date I~ ~ loci
'!u:iit 'In bUPlicate
·
Greater pr.oe Bay S-213A ML Permit
I Wè:lrName:( J$:.21~aA,S-213A L 1, S-213A L2.;, 8-213A:L.3, &S~213A L41
I Type of Well (producer or injector): I Schrader OBd, OBc, OBb, OBa and OA Multilateral Producer I
Surface Location: 4,346' FSL, 4,500' FEL, Sec. 35, T12N, R11E
X = 618,929.96 Y = 5,980,549.84
S-213a OBd Target Start: 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E
X = 616,389.90 Y = 5,978,485.05 Z = 5,180' TVDss
S-213a OBd Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11 N, R12E
X = 61 Y = Z = 5,155' TVDss
S-213a L 1 OBb Target Start: 2,545' FSL, 1,607' FEL, Sec. 34, T12N, R12E
X = 616,574.94 Y = 5,978,712.43 Z = 5,120' TVDss
S.213a L1 OBb Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E
X = 616,999.90 Y = Z = 5,060' TVDss
S-213a L2 OBc Target Start: 2,172' FSL, 1,873' FEL, Sec. 34, T12N, R12E
X = 616,314.90 Y = 5,978,335.05 Z = 5,105' TVDss
S-213a L2 OBc Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11 N, R12E
X 616,999.90 Y Z 10' TVDss
0~~~.$ì$>";>~#~'¿'w.x-",~,:fi'
S-213a L3 OBa Target Start: 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E
X = 616,389.90 Y = 5,978,485.05 Z = 5,040' TVDss
S-213a L3 OBa Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E
X = 61 Y Z 5,020' TVDss
S-213a L4 OA Target Start: 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E
X = 616,389.90 Y = 5,978,485.05 Z = 5,000' TVDss
5-213a L4 OA Target End: 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E
X = 616,999.90 Y = 5,973,650.05 Z = 4,990' TVDss
I AFE Number:
I PLD5M1074
KBE = 61.90'
I Rig: I Doyon 16
I Estimated Start Date: I Nov. 1 SI 2004
I Operating days to complete: 150.68
OBd MD 12,149' Well TVDrkb: TD 5,217' Max Inc. 93° KOP 2,870'
OBb MD 12,150' Well TVDrkb: TD 5,122' Max Inc. 99° KOP 6,337'
OBc MD 12,144' Well TVDrkb: TD 5,172' Max Inc. 92° KOP 6,634'
OBa MD 12,139' Well TVDrkb: TD 5,082' Max Inc. 93° KOP 6,070'
OAMD 12,128' Well TVDrkb: TD 5,052' Max Inc. 93° KOP 5,943'
Current Well Information
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Original Well API #:
Sidetrack API #'s
S-213a API OBd #:
S-213a L1 API OBb #:
S-213a L2 API OBc #:
S-213a L3 API OBa #:
S-213a L4 API OA #.
Well Type:
Current Status:
H2S:
-9,900' to PBU Unit Boundary at Top OA(this is the closest point
in the producing well section to any unit boundary)
-500' to S-01 (Ivishak well) at Top OA
50-029-22993-00
50-029-22993-01
50-029-22993-60
50-029-22993-61
50-029-22993-62
50-029-22993-63
Schrader O-sand Penta-lateral Producer
Planned pre-rig decompletion: Tubing cut at ±5,250' MD
o ppm from produced fluids (approximated to be around 10 ppm due to
contaminated gas lift gas)
Draft Permit 10/21/04
·
BHT: 84 of @ 4,400' TVDss (Estimated)
BHP: Static taken on S-213 on 9-18-04 showed an 8.15 ppg EMW.
MDT's taken on S-116 on 12/03 agreed with the recent static, but also showed higher pressures at the
midltoe of the planned S-213A trajectory
Sand Heal Psi. (ppg) TVDrkb TDPsi(ppg)
OA 2,141 (8.15) 5,052 2,338 (8.9)
OBa 2,160 (8.15) 5,097 2,352 (8.9)
OBb 2,175 (8.15) 5,132 2,370 (8.9)
OBc 2,194 (8.15) 5,177 2,394 (8.9)
OBd 2,215 (8.15) 5,227 2,414 (8.9)
Cement:
TO 1 PBTD:
Is this well frac'd?
Mechanical Condition
S-213 Wellhead:
Base Flange height:
Nabor 9ES:
Doyon 16:
Tubing:
Casing
Casing Head:
Casing Hanger:
Tubing Spool:
Tubing Head Adapter:
Tbg. Hanger:
Tree:
Open Perfs:
Tubing / Casing Fluids:
Materials Needed
Greater prwe Bay S-213A ML Permit
TVOrkb
5,052
5,082
5,122
5,172
5,217
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Top of cement on 9-%" casing is at surface.
Top of cement on 7" casing is at 3,000' MD based on bond log run on 1/9/01
5,314' MD TOF inside 3-W' tubing.
Yes
FMC 11" Gen 5 with 7" mandrel hanger
Above MSL = 35.90'
KB / MSL = 64.40'
KB / MSL = 61.90'
3-%", 9.3#, L-80, NSCT with tubing cut @ -5,260' MD.
-Cut correlated to GLM @ 5,227
Surface: 9-%",40#, L-80, BTC to 2,859' MD
Production: 7", 26#, L-80, BTC from surface to 6,507' MD
FMC 11", 5M
7" FMC Mandrel Hanger and packoff with 8.000-4 ACME-2G-LH external R&R thread top
FMC 11" X 11" 5M
FMC 11" X 4-1/16", 5M
FMC 11" x 4-%" with 4-V2" NSCT pup joint
7.11500 EN, CIW BPVT
Cameron 5M,4-1/16"
Currently from 5,892- MD to 6,165' MD (planned to be abandoned with drilling rig)
SW with diesel cap down to -2,000' TVD
6,600'
1 each
40 each
2 lots
3 each
7-%" 29.7# L-80 STL-FJ Casing (Burst: 6,890; Collapse: 4,790)
7-%" STL-FJ Float Shoe and Float Collar
7-%" x 8- %" In-line Centralizers
7-%" casing pups 5',10',20' (Verify with Unique on stock)
7-%" RA Tag
5 x Production Liners:
29,210'
730 each
4 each
5 each
1 each
1 each
3 assemblies
4 %", 12.6#, L-80, IBT-Mod Slotted
4 W' x 5 3.,4" x 8" Straight Blade Centralizers
7-%" x 4-%" Baker ZXP Liner Top Packer
4- W' Halliburton Float Shoes
6" x 3" x 10' Aluminum KO billet
6.4" x 15' EWS Swell Packer
Baker Level 3 Hookwall Hangers with LEM
2
Draft Permit 10/21/04
Greater prwe Bay 5-213A ML Permit
5,900'
1 each
3 each
1 each
4 each
1 each
5,900'
1 each
4-%", 12.6Ib/ft, L-80, BTC-M tubing
Baker PRM Production Packer 7-%" X 4-W
Halliburton X-Nipple (3.813" ID)
4-%" Baker CMD Sliding Sleeve
Camco 4-Y2" X 1" KBG-2 Gas Lift Mandrels
Phoenix pressure gauge
I-wire for the Phoenix gauge
4-%" WLEG (Unique Machine)
Surface and Anti-Collision Issues
Surface Shut-in Wells: S-112i and S-120 will need to be shut-in for the rig move on and off S-213A.
Close Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile.
roach Well List:
WW~fjllf'lr';~1 il.I'"II'~1_~ã"f,¡r~~~
NlA,::BL'L"' . N/A::,ê,:' . "N/A .", ,::""U~~D,. ....... ····1
Mud Program
&-3A" Intermediate Hole Mud Properties: I Freshwater Mud (LSND) PH: 9.0 - 9.5
Interval I Density (ppg) Funnel vis I yp I Tauo I PV I API Filtrate I MBT
9.0 - 9.3 45 - 60 22 - 30 3 - 6 12 -18 4 - 6 < 20
Maintain proper fluid rheology & lubricant concentration to achieve the directional
requirements
Optimize mud rheology to maximize ROP while following ECD guidelines
Reduce shaker blindin while drillin the UGNU BDF 263).
6-%" Production Hole Mud Properties: I LVT-200 MOBM (Versa-Pro)
Interval I Density (ppg) Stability I yp I Oil: H20 Ratio I PV I API Filtrate I MBT
9.2 650 - 900 16 -19 80: 20 < 20 < 5 < 6
Minimize solids/liquid invasion by maintaining optimum PSD of bridging agents.
Maintain minimal ECD's by reducing drill solids accumulation through utilization of
the rigs solids control system and effective dilution.
Interval Specific
Objectives:
Interval Specific
Objectives:
Well Control
Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will
be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below,
BOP equipment will be tested to 3,500 psi.
BOPE and drilling fluid system schematics are on file with the AOGCC.
Production Section-
· Maximum anticipated BHP:
· Maximum surface pressure:
2,312 psi @ 5,052' TVDss (8.8 ppg EMW). Based on S-116 MDT's
1,807 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOP test pressure:
· Test Frequency:
· Planned completion fluid:
3,500 psi (7-%" casing will be tested to 3,500 psi)
7 day test cycle (Pre drilling phase) 114 day test cycle (Drilling phase)
Estimated 9.3 ppg Brine / 6.8 ppg Diesel
..!J[_II::'.··.':ì[.~_ ,J.,....'.....:m1i
5,000 psi Working Pressure 3,500/250 psi Rams & Valves
(entire stack and valves 2,500/250 psi Annular
3
Draft Permit 10/21/04
.
Greater prwe Bay S-213A ML Permit
Disposal
· NO ANNULAR INJECTION ON THIS WELL.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at OS-04. Any
metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to OS-04 for injection. Haul all
Class I waste to Pad 3 for disposal.
Formation Markers
SV6 1,561 N/A 718 8.8 Above KOP
Base Permafrost 1,901 N/A 874 8.8 Above KOP
SV5 2,137 N/A 983 8.8 Above KOP
SV4 2,315 N/A 1,065 8.8 Above KOP
SV3 2,681 N/A 1,233 8.8 No
SV2 2,826 2,926 1,270 8.6 No
SVl 3,153 3,340 1,427 8.7 Poss. Free Gas btw 3,150 & 3,190'
UG4 3,484 3,802 1,585 8.7 No
UG4A 3,510 3,839 1,598 8.8 Heavy Oil throughout
UG3 3,855 4,320 1,763 8.8 Thin coals
UGl 4,410 5,094 2,028 8.8 Heavy Oil throughout
Ma 4,654 5,435 2,145 8.9 Yes
Mbl 4,705 5,507 2,169 8.9 Yes
Mb2 4,750 5,570 2,191 8.9 Oil & Water owe -4766'SS
Mc 4,825 5,683 2,227 8.9 Yes
Na 4,890 5,790 2,258 8.9 Yes
Nb 4,905 5,816 2,265 8.9 Yes
Nc 4,942 5,884 2,283 8.9 Yes
OA 4,990 5,979 2,306 8.9 Yes
OBa 5,035 6,080 2,327 8.9 Yes
OBb 5,070 6,170 2,344 8.9 Yes
OBc 5,115 6,312 2,365 8.9 Yes
OBd 5,165 6,591 2,389 8.9 Yes
T.D. 5,155 12,149 Yes
CasinglTubing Program
8-3,4" 7-%" 29.7# L-80 STL-FJ 6,565' 26' 126' 6,591' 1 5,227'
6-3,4" OBd 4-Y2" slotted 12.6# L-80 IBT 5,749' 6,400' 1 5,198' 12,149' 15,217'
6-3,4" OBb 4-%" slotted 12.6# L-80 IBT 5,516' 6,634' 1 5,182' 12,150'/5,122'
6-3,4" OBc 4-Y2" slotted 12.6# L-80 IBT 5,832' 6,312' 15,177' 12,144' 15,172'
ß..3,4" OBa 4- %" slotted 12.6# L-80 IBT 6,094' 6,045' 1 5,082' 12,139' 15,082'
6-3,4" OA 4-Y2" slotted 12.6# L-80 IBT 6,210' 5,918' 15,022' 12,128' 15,052'
Tubing 4-%" 12.6# L-80 IBT-M 5,844' 26' 1 26' 5,870' 1 5,000'
Cement Calculations
Casing Size 19-% -in 40-lb/ft L-80 BTC surface casing Cement KO Plug
Basis 200% excess in open hole 50% excess in annulus. Top of KO plug 2,300' MO
Total Cement Vol: Wash None
Spacer None
Lead None
Tail 70-bbl, 423-sx 15.7-lb/gal AS1 - 0.93 ft~/sx
. ". ,.(~~.p'...of t.~il..~~.~~~~~~.~~l . .... .... ..............................';' .. ".' .............~w.@'_@......w,..w.,.....'M@......."....._.",..
Temp r BHSf:'sO°F ir~~ S()R~' I3·Hcf·65;,F~~ti~at~~tb;D~;,eìì'·
4
Draft Permit 10/21/04
· Greater pr. Bay S-213A ML Permit
Casing Size 17-% -in 29.7-lb/ft L-80 STL-FJ intermediate casing
Basis Top of tail cement 500-ft MD above top of Schrader Ma-sand. 30% excess over gauge.
Total Cement Vol: Wash 20-bbl Water
Spacer 30-bb11 0.7 -Ib/gal MudPush Spacer
Tail 43 bbl, 202-sx 15.8-lb/gal Premium - 1.20 ftj Isx with D600G - 2gal/sk; D047 -
0.2gal/sk; D174 - 3% BWOC; B153 - 0.15gal/sk
of tail at Ma: MD
Temp BHST == 85°F from SOR, BHCT 90°F estimated by Dowell
7-0/." Casing Space Out
a) Space 7-%" casing out with pups and long/short joints as required to place the top of a long full joint - 5-
15' above the top of the OBc, OBa and OA sands to allow for the window to be milled just below the top
of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance
reservoir contact depending on the angle of intersection of each zone.
b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth
except on the OBd lateral. It will need to be placed 120' above the casing shoe.
c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out.
7-0/." String Centralizer Placement
a) Centralizer size: 7-%" X 8-%" Integral centralizers (7-%" X 8-%" X 17-%")
b) Do not run centralizers on the window joints spaced at the top of each sand.
c) Centralizers will be run on the first 40 joints to allow for adequate standoff for cement.
d) The centralizer program is subject to change pending modeling and hole conditions.
4 %" Slotted Liner Centralizer Placement
a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking
is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop
collar. Do not put any centralization on the first two joints above the bent joint.
Survey and Logging Program
8-%" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only)
Open Hole: MDT Pressures & Fluid Samples
Cased Hole: USIT Bond Lo onl as contin ency if oor cement· ob
6-3,4" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (DenlNeu recorded only) I AIM I PWD
Cased Hole: None
5
Draft Permit 10/21/04
· Greater Pree Bay S-213A ML Permit
Drillina Hazards and Continaencies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control/ Reservoir Pressures:
Sand
OA
OBa
OBb
OBc
OBd
Heal Psi (ppg)
2,141 (8.15)
2,160 (8.15)
2,175 (8.15)
2,194 (8.15)
2,215 (8.15)
TVDss
5,052
5,097
5,132
5,177
5,227
TD Psi (ppg)
2,338 (8.9)
2,352 (8.9)
2,370 (8.9)
2,394 (8.9)
2,414 (8.9)
TVDss
5,052
5,082
5,122
5,172
5,217
Comments
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
II. Hydrates and Shallow gas:
A. Gas hydrates are present below S-pad, but have not been a significant issue thus far during S-Pad drilling. If
hydrates are encountered follow the recommended practice and apply good drilling operational practices.
III. Lost Circulation/Breathing:
A. Lost circulation is possible within the Schrader interval due to the reduced pore pressure. A LCM decision tree
has been developed to give direction in the event of losses.
B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee.
IV. Kick Tolerance/lntegrity Testing:
A. The 9-%" casing has been cemented to surface.
B. The 7-%" flush joint casing will be cemented with 15.8 Ib/gal cement to 500' MD above the Ma sand.
C. Integrity Testing: NOTE: If the LOT I FIT is less then the minimum notify the ODE immediately
Surface I 8-3,4" 52.2 9.2 8.9 12.2 (LOT)
Intermediate I 6-3,4" Infinite 9.2 8.9 10.5 (FIT)
NOTE: FIT's will only be done on the first horizontal lateral due to pressure connectivity
between subsequent laterals.
NOTE: All LOT I FIT will be taken with a minimum of 2o-ft and a maximum of So-ft of new hole
drilled outside of the previous casing string
V. Stuck Pipe
A. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners
moving as much as possible and run one centralizer per joint to help with standoff.
VI. Hydrogen Sulfide
A. S-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be
followed at all times. In Nov. 2003 85 ppm of H2S was measured at one S-Pad well (S-05A), however all other
wells tested below 20 ppm in 2004 and since the reading, S-05A has been shut in.
VII. Faults
There is one planned fault crossing and two possible fault crossings while drilling the well. It is also possible to
encounter sub-seismic faults along the proposed well path. In the production hole sections, if a fault throws us out
of section steer up as fast as possible to determine where we are within the section. This will make it easy to
lows ide OH sidetrack to get back on course.
Fault #1: UG1 5,202' MD
Fault #2: O-sands 5,900' MD
Fault #3: O-sands 6,825' MD
4,485' TVDss
4,952' TVDss
5,176' TVDss
25' Northeast throw
o - 20' Northeast throw
o - 35' Northeast throw
CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
6
Draft Permit 10/21/04
· Greater pree Bay S-213A ML Permit
Drill and Complete Procedure Summary
Pre-Rie: Work:
1. Rig up Schlumberger slickline, and drift tubing down to the jet pump fish with drift appropriate for 3.5" chemical/jet
cutter. Last well operation was CTU fishing attempts to retrieve the jet pump. Last tag was at 5,314' CTU MD.
a. NOTE: If use the chemical cutter it will be required to have the tubing and annulus hydrostatic pressures
equalized prior to cutting the tubing. It may be desirable to punch holes in the tubing just below the proposed
chemical cut depth in order to allow for pressure equalization. Optional string shot per SOP.
2. RIH w/ chemical/jet cutter. Cut the 3-%" L-80 tubing at approximately 5,250' MD. Chemical cutter is at the
discretion of the Wells Group Representative. This cut will not be fished, however a complete cut is critical to
successful decompletion.
a. NOTE: If chemical cutter is used, then the well should be displaced to seawater prior to making the cut. It is
against SOP to use a chemical cutter in diesel.
3. RU and circulate out the diesel through the tubing cut. Once the tubing ànd annulus are displaced, bullhead sufficient
seawater below the jet pump to fill the volume (-20 bbls) to the perfs. Observe 1.5 bpm, 2500 psi max. Previous
injectivity tests that were done showed a rate through the jet pump of approximately 1.2 bbls/min @ 2,000 psi surface
pressure. Freeze protect down to 2,000' TVD with diesel.
a. NOTE: This will leave the well -60 psi under-balanced with the formation. A static BHP was taken on
9/18/04 which gave a reservoir pressure of 2,110 psi @ 5,000' TVDss (8.12 ppg EMW). These pressures
assume a diesel gradient of 0.354 psi/ft down to 2,000' TVDss and a seawater gradient of 0.447psi/ft down to
5,000' TVDss.
b. NOTE: The well should not be left with methanol as a freeze protect fluid, diesel only.
4. Test all packoffs and tubing hanger seals to 5,000 psi for 30 minutes. MITOA and function test alllockdown screws,
repair or replace as needed.
a. Verify tubing and annuls pressures and give to rig during the handover. Set a BPV in the tubing hanger and a
VR plug in the 7x4-W IA valve. Secure well.
5. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the
handover form.
Drillinq Riq Decompletion Operations:
1. MIRU Doyon 16. Circulate out diesel with seawater. Verify the well is dead.
2. Set TWC. Nipple down tree. Nipple up and test BOPE.
3. Pull and lay down the 4-W tubing (planned tubing cut at -5,250').
4. PU 4,200' of 4" DP and stand back in derrick. MU clean-out BHA with 4" DP and flat bottom mill (or used bit) / boot
baskets / etc. RIH to top of tubing stub PU additional 4" DP, circulate and condition wellbore as required. Pump hot oil
to remove excess paraffin if needed.
5. MU 7" Halliburton EZSV (running 00 5.5") and RIH and set just above tubing stub @ 5,250'). Set packer and test to
1,000 psi. Dump 10 bbls cement on top of EZSV (-261' of coverage). POOH and LD running tool.
6. MU 7" Halliburton EZSV (running 00 5.5") and RIH and set @ 3,150'. POOH and LD running tool.
7. MU 7" multistring casing cutting assembly and RIH to -2,940' MD and cut casing. Close annular and circulate annulus
clean with hot seawater and Safeclean sweep, follow with 9.0 ppg mud.
8. Pull 7" casing and verify cut, circulate and reciprocate casing to clean up remainder of mud/diesel in OA. Remove
wellhead pack-off and LD 7" casing.
9. RIH with cement stinger and lay in 70 bbl Class G 15.7 ppg Arctic Set 1 cement plug from EZSV @ 3,150' to 2,300'
MD. (Assumes 200% excess in open hole portion from 2,940' to 2,860'.) POOH
-;-lè ç I () .- 40 l It1Jf p!O<J Cv J.
Drillinq Riq Sidetrack Operations: ~
../ 1. MU 8-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at ±800' from the
bit in the HWDP section and RIH to top cement plug. Dress off plug, circulate and condition mud. Directionally drill
ahead to TO (Just below the Top OBd) as per directional profile to 6,591' MD / 5,227' TVD.
a. Make short trip as needed, work tight spots as seen.
2. Circulate and condition mud at TO. Make sure hole is clean prior to POOH. POOH, LD drilling BHA.
3. RU Schlumberger DPC MDT tool assembly and RIH and acquire pressure and fluid samples as per the town
Geologist. POOH and LD assembly.
7
Draft Permit 10/21/04
· Greater pru.e Bay S-213A Ml Permit
4. Make cleanout trip to TO and circulate and condition mud as appropriate.
5. MU and run 7-%" 29.7# L-80 STL flush joint casing to TO. Cement in one stage to 500' MD above the Schrader Ma
sand. Bump plug with seawater. land casing on mandrel hanger.
6. Clean pits for displacement. Freeze protect 7-%" x 9-%" annulus with dead crude to 2,200' TVD.
7. PU 6-3,.4" conventional assembly with MW DIG R/Resl Azimuthal Den INeu/PWD and RIH to the float collar. Test the 7-
%" casing to 3,500 psi for 30 minutes. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and
condition mud. Drill 20' of new formation below rathole and perform an FIT to 12.0 ppg EMW.
8. Directionally drill ahead to TO geosteering through the OBd to TO at 12,149' MD 15,217' TVD (prognosed). Perform
wiper trip, circulate and condition mud as required. Displace well to 9.2 ppg SFMOBM as per MI displacement
procedures.
9. POOH to near OBc window depth, log up across the OBc, OBa and OA windows. POH LD drilling assembly.
10. MU and run 4-W' 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TO. Position liner top packer 40'
below the top OBc sand. POOH and LD liner running assembly.
11. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is
near the top of the OBc sand (planned window exit: 6,312' MD). Orient whipstock to highside. Shear off Whipstock.
Displace wellbore back to MOBM & mill window. POOH
12. RIH with 6-3,.4" drilling assembly (with MWD 1 GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock.
Directionally drill the OBb lateral to TO. Planned TO is 12,150' MD. Circulate and condition mud and perform wiper
trip if necessary. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. POOH.
13. Run and set 4-¥2" slotted liner with 6" aluminum billet and Weatherford GS running tool, POOH and LD liner running
string.
14. RIH with 6-3,.4" drilling assembly (with MWD / GR 1 Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to aluminum
billet in the open hole.
15. Displace well back to MOBM and KO of aluminum billet and directionally drill the OBc lateral to TO. Planned TO is
12,144' MD. Circulate and condition mud and perform wiper trip if necessary. Displace well to 9.2 ppg SFMOBM as
per MI displacement procedures. POOH.
16. Pull whipstock #1. Run 4-%" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker
Lateral Entry Module #1 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools.
17. PU the 7-%" whipstock assembly. Set the whipsock on the OBc liner top packer such that the top of the window is
near the top of the OBa sand (planned window exit: 6,045' MD). Orient whipstock to highside. Shear off of
Whipstock, displace well back to MOBM and mill window. POOH
18. RIH with 6-3,.4" drilling assembly (with MWD 1 GR / Res / Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock.
Directionally drill the OBa lateral to TO. Planned TO is 12,139' MD. Circulate and condition mud and perform wiper
trip. Displace well back to SFOBM and POOH.
19. Pull whipstock #2. Run 4-Y2" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker
Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools.
20. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is
near the top of the OA sand (planned window exit: 5,918' MD). Orient whipstock to highside. Shear off of Whipstock,
displace well back to MOBM and mill window. POOH
21. RIH with 6-3,.4" drilling assembly (with MWD 1 GR / Res 1 Azimuthal Den recorded 1 Neu recorded 1 AIM) to whipstock.
Directionally drill the OA lateral to TO. Planned TO is 12,128' MD. Circulate and condition mud and perform wiper trip.
Displace well back to SFOBM and POOH.
22. Pull whipstock #3. Run 4-%" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook
Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL
brine. POOH.
23. MU 4-%" 12.6# BTM-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing
hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus.
24. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to
3,500 psi. Shear DCK-1 valve.
25. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi.
26. Pull two-way check. Freeze protect the well to 2,000' TVD. Install VR plug in 7-%" casing annulus valves.
27. Install BPV. Secure the well and rig down 1 move off Doyon 16.
Post-RiQ Work:
1. MIRU slickline. Pull the ball and rod I RHC plug.
2. Pull out DCK-1 shear valve, install GLV in all of the other mandrels as per the PE.
8
Draft Permit 10/21/04
· POST RIG - COMPLETION _TREE FMC 4-1/16" 5M .
S 213A L 1 L2 L3 & L~WELLHEAD FMC Gen 5 System
- "" 11", 5M csg head wi 7-5/8" mandrel hanger & packott
I 11"x11",5M,tbgspoolwl
" 11" x 4-1/2" tubing hanger with controllíne ports
.~ 11" X 4-1116" Adaptor Flange
[1
... ~ It 20' X 34" 215.5 Ibltt, A53 ERW Insulatedl 109'
Halliburton X-Nipple (3.813" ID) 12,200' TVD I
Phoenix
Pressure
Gauge
with control
lines to surface
DATE
10/1212004
Ong KB elev (N-9ES) = 644'
r New Plan h8 elev (016) = 619'
Cameo 4-112" x 1" KBG-2 GLM's
Junction SÞecific:ations:
Junction 10 through LEM
Module without díverter 3.65"
/4.5" Baker sliding sleeve with 3.813" ID
/
.... 9-618",40# L-80 BTC Csg @ 2,859' MD
4-112~, 12"6 Ib/tt, L-aO, STC-M Tubing
Coup 00 5.2 Orift/lO 3833"/3.958"
- 7-518" X 5-1/2" Baker PRM Packer
Halliburton X-Nipple (3.813" 10)
4.5"WLEG L 5,870' MD I
9.2 PPG Versapro MOBM below Completion
OA Lateral
r 5,918'-12,128'1
6-3/4" Open hole Horizontal Laterals
4-112",12.6 Ib/ft, L-aO, STC-M Liners
Coup 00 5.2 OriftllD 3.833"/3.958"
OBa Lateral
16,045'-12,139'1
7-5/8",297#. L-80, STL-FJ
Cas In 9 0 ri ft 6.7 5 "
Casing 10 6.875"
RA Tag TBO
Top Baker LEM Assembly @ 5,868' M 0
Window In 7·5/8" caslng@ 5,918' M 0
Well Inclination @ Window ~ 52'
Top Baker LEM Assembly @ 5,995' MD
Window in 7-5/8" casing@ 5,O15' MD
Well Inclination @ Window = 65'
Top Baker LEM Assembly@ 6.262' MD
Window in 7-5/8' casing@ 6,312'MD
Well Inclination @ Window = 71'
7-618" Casing Shoe @6.591' MD
REV BY
GL~
API
0: 150.029-22993.00
500029-22993-ICIC
150,,029-22993-xx
500029·22993-ICIC
500029-22993-xx
COMMENTS
MlK TRIOLO
Level' Multi-Leterel, 4.lIZ' GL Completion
POLARIS
WELL: S-213A ML
¢?
õ
o
'A
ê
:.:::-
~
II
()
ro
(.)
(f)
o
¡:::
1800
4800
5400
1800
Schlumberger
WELL
FIELD
Prudhoe Bay Unit - WOA
STRUCTURE S-PAD
S-213AL3 (P5)
MagneticParametars
Model' BGGM2004
Surfacetocation
Date: Novembør15.2004 lat: N702119.849
FS: 57608.1nT Lon: W14922.959
NAD21 Alaska Stale Planes, Zone 04. US Foot
Nonhlng: 5960549.84 !tUS Grid CO!W: +0.90963906'
fasting: 618929.96 ftUS Scale Fact 0.9999160676
Miscellaneous
Slot· 6-213
Plan: 8-213Al3 (P5) OBa
Dip: 80.844'
MagDec: +24.845'
TVD Ref: Rotary Tabte (61.90 n above MSL)
SrvyDate: October06.2004
2400
.
3000
3600
4200
4800
5400
6600
7200
6000
,;....,....,....."...",......,..",.¡.....,....,..............···..···..";···..·..·..·..·",,..·..,,··,,·,....i..···..····..,····.......,....".....~.......".......h"................(".........".....,,',...............~.......,,,..........,...............(......................".............;..........,.........................i....4800
: :S-213AL3 T2 i S·213AL3 ~3 S~13AL3T4 i ¡ S.213AL3 T5 EncÌCrv ¡ ¡
: iJ900 PI ¡ Cry 6/100 I End crvl : Cry 6I100\.: \ lEnd Cry ~rv 6/100~/End Cry ¡ ! Cry 61100 \ I çrv 6/100 S·213AL3 T6\ i\End Cry TD /4-1/2" Lnr\:
: End Cry : \ : : : : : \ : 1 . .
: 13A (P4) OB ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡
: : : , , , ,- j '213AL3!P5)OBa
: : . . . , , i S:213ALI P5)OBb
: ; : ! ; ; ! ¡ : S¡2UAL2 (P5) OBc
K213 ""i . ! i ¡ ¡ ¡ ¡ 1 S¡218A(P4)OBd
KOPCrvll.5/100- , : , , , , : :
1~,,:~~r'·~1Iimllmlmmrr ~oo
2400
3000
3600 4200 4800 5400
Vertical Section (ft) Azim = 196.54°, Scale = 1(in):600(ft) Origin = 0 N/-S, 0 E/-W
6000
6600
7200
e
, WEl.l
S-213AL3 (P5)
--
Model: 8GGM2004
Dip: 80.844'
Mag Dee: +24.845"
^
^
^
Z
.:::
Õ
o
~
ê
=
~
II
()
(¡¡
o
en
en
v
v
v
.
.
FielD
Prudhoe Bay Unit - WOA
STRUCTURE S-PAD
I ...-""""'"
Date: NoYembeft5,2004 Lat: N702119.849
FS: 57608.7 nT W149 2 2.959
NAD27 Alaska Stale Planes, Zone 0-4, us Feet
Northing: 5980549.84 nus Grid Corw: +0.90963906'
Easting: 618929.96 ftUS Scale Fad.: 0.9999160676
............
Slot: $-213
Plan: S-213AL3(P5)0Ba
-4000
-3200
-2400
-1600
~'"
5- ¡
-1600
· .
· .
'¥ ............... ...............n..'....... ....HH
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
.........."............................
..~?~.~.~.~~:~~~............
~se Whipstock
Top YVhlPstocl<
roo" i
-2400
,·..........,.....,.......'.n....4.................,.
Cry 61100
~213AL3 T3
E~d Cry
... .............. ..._........ 13A.fft4........... .~...... .. ............ .._....
:Jof
,(~
~
· .
..................H..............................................._....
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
. . .
.._...........""...., .... .......................................... ..........H............
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
,...................
-3200
...............................
Cry 61100 ¡
5-213AL3T4~
End CrY ~
-4000
· .
._........................._.......................4..............,;,..
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
· .
-4800
........................... ·HH.
-5600
..........................
Cry 61100
5-213AL3 T5
-6400
· .
· .
· .
........,,,.......................,,......................,,,,...........
· .
· .
TO 14-112"~nr ~
5-213ALþ (P5) CBa ¡
S-213-}t2 (P5) CBe j
5-213~L1 (P5) CBb ¡
5-21~A (P4) CBd .
~··__·:···=·~·:.·~==·~t::.
-7200
.........................................h.."................ ...""",....i .
, '5-213A FR?
-4000
-3200 -2400 -1600
<<< W Scale = 1 (in):800(ft) E »>
Schlumberger
ì'JDRet. Rotafy Table (61.90 ftaboYe MSl)
Srvy Dale: October 06, 2004
-800
-1600
-2400
-3200
-4000
-4800
-5600
-6400
-7200
-800
S-213AL3 (P5) Proposal Schlumberger
Report Date: October 6, 2004 Survey I DLS Computation Method: Minimum Curvature I Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 196.540'
Field: Prudhoe Bay Unit· WOA studY Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure I Slot: S-PAD I S·213 II b lilt)' TVD Reference Datum: Rotary Table
Well: S·213 F ea. I TVD Reference Elevation: 61.90 ft relative to MSL
Borehole: Plan S-213AL3 OBa Sea Bed I Ground Level Elevation: 35.90 ft relative to MSL
UWVAPI#: 500292299362 Magnetic Declination: 24.845'
Survey Name I Date: S-213AL3 (P5) OBa / October 6, 2004 Total Field Strength: 57608.708 n T
" ort I AHD I DDI/ ERD ratio: 190.568' /8544.987 ft /6.585/1.681 Magnetic Dip: 80.844'
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: November 15, 2004
Location Lat/Long: N 70.35551358, W 149.03415537 Magnetic Declination Model: BGGM 2004
Location Grid N/E YIX: N 5980549.840 nus, E 618929.960 nus North Reference: True North .
Grid Convergence Angle: +0.90963906' Total Corr Mag North .> True North: +24.845'
Grid Scale Factor: 0.99991607 Local Coordinates Referenced To: Weli Head
I Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along HOle NS EW I DLS I Tool Face I Build Rate Walk Rate Northing Eastlng Latitude Longitude
Depth Section Departure
(It) (deg) (deg) (It) (It) (It) (It) (It) (It) ( deg/tOO It ) (dog) (deg/tOO It) (deg/tOO It) (ltUS) (ltUS)
Top Whipstock 6044.66 64.09 226.67 5020.00 5081.90 1893.18 2461.14 -1380.84 -2000.38 4.00 O.OOG 3.80 -1.40 5979137.54 616951.92 N 70.35174052 W 149.05039545
Base Whipstock 6056.66 66.01 226.67 5025.06 5086.96 1902.59 2472.02 -1388.31 -2008.29 16.00 O.OOG 16.00 0.00 5979129.95 616944.13 N 70.35172011 W 149.05045969
KOP Cry 11.5/100 6069.66 66.01 226.67 5030.35 5092.25 1912.86 2483.90 -1396.46 -2016.93 0.00 -9.04G 0.00 0.00 5979121.66 616935.62 N 70.35169784 W 149.05052981
6100.00 69.46 226.08 5041.84 5103.74 1937.22 2511.97 -1415.83 -2037.25 11.50 -8.82G 11.36 -1.93 5979101.97 616915.61 N 70.35164492 W 149.05069473
6200.00 80.83 224.31 5067.44 5129.34 2021.91 2608.47 -1483.85 -2105.69 11.50 -8.36G 11.37 -1.77 5979032.88 616848.27 N 70.35145903 W 149.05125018
90' Pt 6280.60 90.00 222.97 5073.88 5135.78 2093.35 2688.72 -1541.93 -2161.07 11.50 -8.25G 11.38 -1.66 5978973.93 616793.82 N 70.35130030 W 149.05169965
6300.00 92.21 222.65 5073.51 5135.41 2110.75 2708.12 -1556.16 -2174.25 11.50 -8.26G 11.38 -1.65 5978959.49 616780.87 N 70.35126142 W 149.05180661
End Cry 6308.54 93.18 222.51 5073.11 5135.01 2118.41 2716.65 -1562.44 -2180.02 11.50 O.OOG 11.38 -1.65 5978953.12 616775.20 N 70.35124426 W 149.05185344
Cry 6/100 6708.71 93.18 222.51 5050.91 5112.81 2477.63 3116.21 -1856.99 -2450.00 0.00 -91.41G 0.00 0.00 5978654.35 616509.96 N 70.35043935 W 149.05404440
6800.00 93.03 217.02 5045.96 5107.86 2561.36 3207.36 -1927.03 -2508.28 6.00 -91.71G -0.16 -6.01 5978583.40 616452.80 N 70.35024795 W 149.05451735
6900.00 92.84 211.02 5040.83 5102.73 2656.58 3307.23 -2009.77 -2564.13 6.00 -92.01G -0.19 -6.00 5978499.79 616398.28 N 70.35002187 W 149.05497052
S-213AL3 T2 6916.98 92.80 210.00 5040.00 5101.90 2673.03 3324.18 -2024.38 -2572.74 6.00 -91.65G -0.21 -6.00 5978485.05 616389.90 N 70.34998195 W 149.05504035
7000.00 92.65 205.02 5036.05 5097.95 2754.42 3407.11 -2097.91 -2611.03 6.00 -91.89G -0.19 -6.00 5978410.93 616352.79 N 70.34978104 W 149.05535098
7100.00 92.43 199.01 5031.62 5093.52 2853.82 3507.01 -2190.49 -2648.46 6.00 -92.16G -0.21 -6.00 5978317.78 616316.84 N 70.34952809 W 149.0556.
End Cry 7174.14 92.26 194.56 5028.58 5090.48 2927.88 3581.10 -2261.39 -2669.85 6.00 O.OOG -0.24 -6.00 5978246.55 616296.57 N 70.34933437 W 149.0558
Cry 6/100 7833.90 92.26 194.56 5002.57 5064.47 3586.73 4240.34 -2899.45 -2835.63 0.00 -101.08G 0.00 0.00 5977605.99 616140.96 N 70.34759109 W 149.05717174
7900.00 91.49 190.67 5000.40 5062.30 3652.63 4306.40 -2963.91 -2850.06 6.00 -101.21G -1.16 -5.89 5977541.32 616127.56 N 70.34741497 W 149.05728866
S-213AL3 T: 7916.49 91.30 189.70 5000.00 5061.90 3669.02 4322.89 -2980.13 -2852.97 6.00 -100.93G -1.17 -5.89 5977525.05 616124.90 N 70.34737064 W 149.05731227
8000.00 90.35 184.78 4998.80 5060.70 3751.39 4406.39 -3062.94 -2863.49 6.00 -101.00G -1.14 -5.89 5977442.09 616115.70 N 70.34714441 W 149.05739740
End Cry 8003.66 90.30 184.56 4998.78 5060.68 3754.97 4410.05 -3066.59 -2863.79 6.00 O.OOG -1.15 -5.89 5977438.44 616115.46 N 70.34713444 W 149.05739981
Cry 6/100 8711.63 90.30 184.56 4995.02 5056.92 4447.52 5118.01 -3772.30 -2920.13 0.00 -136.88G 0.00 0.00 5976731.98 616070.33 N 70.34520644 W 149.05785491
S-213AL3 T" 8718.58 90.00 184.28 4995.00 5056.90 4454.32 5124.96 -3779.23 -2920.67 6.00 -136.01G -4.38 -4.10 5976725.05 616069.90 N 70.34518751 W 149.05785924
End Cry 8738.13 89.16 183.46 4995.14 5057.04 4473.40 5144.51 -3798.74 -2921.99 6.00 O.OOG -4.32 -4.17 5976705.52 616068.89 N 70.34513421 W 149.05786990
Cry 6/100 10040.71 89.16 183.46 5014.33 5076.23 5742.06 6446.95 -5098.79 -3000.71 0.00 -87.24G 0.00 0.00 5975404.50 616010.83 N 70.34158250 W 149.05850452
S-213AL3 T5 10090.18 89.30 180.50 5015.00 5076.90 5789.94 6496.41 -5148.22 -3002.42 6.00 -87.15G 0.29 -5.99 5975355.05 616009.90 N 70.34144746 W 149.05851824
Well Design Ver 3.1RT-SP3.03-HF5.00 Bld( d031rt-546)
S-213IS-213IPlan S-213AL3 OBaIS-213AL3 (P5) OBa
Generated 10/6/2004 1 :57 PM Page 1 of 2
Com. 'e1ts Measured I Inclination I Azimuth I Sub·Sea TVD I TVD Vertical I Along HOla NS EW I DLS I Tool Face I Build Rate I Walk Rate I Northing Easting Lat~ude Longitude
Depth Section Departure
(It) (deg) (deg) (It) (It) (It) (It) (It) (It) (degf100 It) (deg) (degf100 It) (degf100 It) (ltUS) (ltUS)
10100.00 89.33 179.91 5015.12 5077.02 5799.36 6506.23 -5158.04 -3002.45 6.00 -87.14G 0.30 -5.99 5975345.23 616010.02 N 70.34142062 W 149.05851850
End Cry 10185.80 89.59 174.77 5015.93 5077.83 5880.36 6592.03 -5243.72 -2998.47 6.00 O.OOG 0.30 -5.99 5975259.63 616015.36 N 70.34118657 W 149.05848592
Cry 6/100 10499.29 89.59 174.77 5018.18 5080.08 6171.48 6905.51 -5555.89 -2969.90 0.00 -89.28G 0.00 0.00 5974947.98 616048.89 N 70.34033377 W 149.05825303
10500.00 89.59 174.73 5018.18 5080.08 6172.14 6906.22 -5556.60 -2969.83 6.00 -89.28G 0.08 -6.00 5974947.27 616048.96 N 70.34033183 W 149.05825250
10600.00 89.67 168.73 5018.83 5080.73 6262.87 7006.22 -5655.51 -2955.45 6.00 -89.24G 0.08 -6.00 5974848.61 616064.91 N 70.34006163 W 149.05813548
10700.00 89.75 162.73 5019.34 5081.24 6348.71 7106.22 -5752.38 -2930.81 6.00 -89.21G 0.08 -6.00 5974752.15 616091.09 N 70.33979702 W 149.05793523
10800.00 89.83 156.73 5019.71 5081.61 6428.74 7206.22 -5846.14 -2896.18 6.00 -89.19G 0.08 -6.00 5974658.96 616127.20 N 70.33954090 W 149.05765394
10900.00 89.92 150.73 5019.93 5081.83 6502.06 7306.22 -5935.77 -2851.93 6.00 -89.18G 0.09 -6.00 5974570.05 616172.86 N 70.33929609 W 149.05729469
8-213AL3 T6 10995.49 90.00 145.00 5020.00 5081.90 6565.09 7401.71 -6016.60 -2801.16 6.00 -90.00G 0.09 -6.00 5974490.05 616224.90 N 70.33907534 W 149.05688251
11000.00 90.00 144.73 5020.00 5081.90 6567.89 7406.22 -6020.29 -2798.57 6.00 -90.00G 0.00 -6.00 5974486.40 616227.55 N 70.33906526 W 149.05686143
11100.00 90.00 138.73 5020.00 5081.90 6625.49 7506.22 -6098.76 -2736.66 6.00 -90.00G 0.00 -6.00 5974408.93 616290.70 N 70.33885094 W 149.05635890
End Cry 11114.80 90.00 137.84 5020.00 5081.90 6633.27 7521.02 -6109.81 -2726.81 6.00 O.OOG 0.00 -6.00 5974398.04 616300.72 N 70.33882077 W 149.05627896
TD 1 4-1/2" Lr,' 12138.77 90.00 137.84 5020.00 5081.90 7165.27 8544.99 -6868.87 -2039.53 0.00 O.OOG 0.00 0.00 5973650.05 616999.90 N 70.33674768 W 149.05070.
LeQal Desctiptlon:
NorthinQ (y1 IftUSl EastinQ (XI IftUSl
Surface 4346 FSL 4500 FEL 835 T12N R12E UM 5980549.84 618929.96
Tie-In 4346 FSL 4500 FEL 835 T12N R12E UM 5980549.89 618929.86
S-' 13AL3 T2 2321 F8L 1796 FEL 534 T12N R12E UM 5978485.05 616389.90
S-213AL3 T3 1365 F8L 2077 FEL 534 T12N R12E UM 5977525.05 616124.90
S-213AL3T4 566 FSL 2146 FEl S34 T12N R12E UM 5976725.05 616069.90
8-213AL3 T5 4477 FSL 2229 FEL S3 T11N R12E UM 5975355.05 616009.90
S-213AL3 T6: 3608 FSL 2029 FEl 53 T11N R12E UM 5974490.05 616224.90
TD 1 BHL : 2757 FSL 1269 FEL S3 T11N R12E UM 5973650.05 616999.90
-
Well Design Ver 3.1 RT-8P3.03-HF5.00 Bld( d031 rt-546 )
8-213IS-213IPlan S-213AL3 OBa18-213AL3 (P5) OBa
Generated 10/6/2004 1 :57 PM Page 2 of 2
-294
······200
"'100
-0
100
200
-294
Field: Prudhoe Bay
Site: PB S Pad
Well: S-213
Wellpath: Plan S-213A OBd
270
180 I..
Travelling Cylinder Azimuth (TFO+AZI) [deg]vs Centre to Centre Separation [100ft/in]
.
S-44~S~(ILI)ILlPB I)
S-42~1W11J-42PB I)
90
-
.
Schlumberger
Anticollision Report
.
Comp.ny:
YJèÏd:
Refer-ence Site:
Referebêe Well:
Refer-ence Wellp.th:
BP Amoco
Prudhoe Bay
PB S Pad
$-213
Plan S-213A OBd
D.te: 10/112004
Time: 14:52:27
Page:
Co-or-din.te(NE) Refer-ençe:
Vertical (fVD) Refer-ence:
Well: 8-213, True North
S-213APlan 61.9
NO GLOBAL SCAN: Using user- defined selection'" sean cr-iter-ia
Inter-polation Method: MD Intel"Val: 50.00 ft
Depth Range: 2870.00 to 12149.14 ft
Maximum Radius: 10000.00 ft
Refer-ence:
Er-r-or- Model:
Scan Method:
Er-r-or- Suñace:
Db: Sybase
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
SUl"Vey Pr-ogr-am for- Definitive Wellpath
Date: 10/1/2004 Validated: No Venion: 7
Planned Fr-om To SUl"Vey Too1code Tool Name
ft ft
155.50 2856.62 Survey #3 MWD+IFR+AK (155.50-6463.17) ~D+IFR:AK MWD + IFR [Alaska]
2856.62 4000.00 Planned: Plan #4 V1 MWD MWD - Standard
2856.62 12149.14 Planned: Plan #4 V1 MWD+IFR+MS MWD + IFR + Multi Station
Casing Points
MD TVD Diameter- Hole Size Name
ft ft In in
2870.00 2838.75 9.625 12.250 9 5/8"
6591.24 5226.90 7.000 8.750 7"
12149.14 5216.90 4.500 6.125 4 1/2"
Summary
<' Offset Wellpath .,. Refer-ence Offset Ctr--CtI' .No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Waming
ft ft ft ft ft
PB S Pad Plan S-111 Plan S-111 V5 Plan: PI 2877.85 5250.00 3744.50 49.04 3695.46 Pass: Major Risk
PB S Pad Plan S-203 Plan S-203 (East) V3 P 2881.16 3500.00 1771.79 50.71 1721.08 Pass: Major Risk
PB S Pad Plan S-203 Plan 8-203 (West) V5 P 2885.78 3000.00 1187.65 47.84 1139.81 Pass: Major Risk
PB S Pad Plan S-208 Plan S-208 VO Plan: S- 2870.00 4900.00 3504.21 65.80 3438.42 Pass: Major Risk
PB S Pad Plan S-400 S-400 VO Plan: S-400 w 5429.03 5484.70 1009.70 71.70 938.01 Pass: Major Risk
PB S Pad Plan S-401 5-401 VO Plan: S-401 w 4323.71 4978.43 1567.05 104.95 1462.09 Pass: Major Risk
PB S Pad S-Q1A S-01A V1 4757.90 4850.00 434.56 107.83 326.73 Pass: Major Risk
PB 5 Pad S-Q1B S-01B V1 4755.10 4850.00 431.88 107.81 324.07 Pass: Major Risk
PB S Pad S-Q1 S-01 V1 4389.20 4450.00 429.06 78.84 350.22 Pass: Major Risk
PB S Pad S-Q2APB 1 S-02APB1 V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk
PB S Pad S-Q2A S-02A V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk
PB S Pad 5-02 S-02 V1 2918.54 2850.00 670.03 42.39 627.64 Pass: Major Risk
PB S Pad S-Q3 5-03 V1 3305.22 3450.00 216.58 51.14 165.44 Pass: Major Risk
PB S Pad S-Q4 5-04 V1 2871.00 2900.00 760.33 40.84 719.49 Pass: Major Risk
PB 5 Pad S-Q5APB1 S-Q5APB 1 V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk
PB 5 Pad S-Q5A S-05A V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk
PB S Pad S-Q5 S-05 V1 2878.78 2950.00 859.37 45.19 814.18 Pass: Major Risk
PB S Pad S-06 5-06 V1 2890.12 3000.00 940.33 41.69 898.63 Pass: Major Risk
PB 5 Pad S-Q7A S-07A V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk
PB 5 Pad S-Q7 S-07 V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk
PB S Pad S-08 5-08 V1 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk
PB 5 Pad S-08 S-08A V2 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk
PB 5 Pad S-Q8 S-08B V3 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk
PB 5 Pad S-09 S-09 V1 2895.57 3150.00 1251.18 45.20 1205.98 Pass: Major Risk
PB S Pad S-1oo S-1OO V10 2912.46 3450.00 1762.32 49.87 1712.45 Pass: Major Risk
PB 5 Pad S-101 S-101 V3 2938.56 2850.00 760.17 42.65 717.52 Pass: Major Risk
PB 5 Pad S-101 S-101PB1 V9 2938.56 2850.00 760.17 42.79 717.38 Pass: Major Risk
PB 5 Pad 5-102 S-102V11 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk
PB 5 Pad S-102 5-102L1 V5 2881.77 3900.00 1933.31 48.14 1885.17 Pass: Major Risk
PB S Pad S-102 S-102L 1PB1 V7 2881.77 3900.00 1933.31 48.10 1885.22 Pass: Major Risk
PB 5 Pad 5-102 8-102PB1 V14 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk
PB S Pad 5-103 S-103 V6 2881.65 3450.00 1347.35 46.75 1300.61 Pass: Major Risk
PB 5 Pad S-104 5-104 V1 2870.00 5400.00 3878.94 44.26 3834.68 Pass: Major Risk
PB S Pad S-105 8-105 V5 2883.61 3650.00 1555.81 39.54 1516.27 Pass: Major Risk
PB 5 Pad 5-106 5-106 V2 2887.09 3600.00 2068.73 47.39 2021.34 Pass: Major Risk
PB 5 Pad S-106 S-106PB1 V12 2887.09 3600.00 2068.73 47.40 2021.33 Pass: Major Risk
PB S Pad S-107 5-107 V36 2878.56 3900.00 2301.09 46.30 2254.79 Pass: Major Risk
PB 5 Pad 5-108 5-108 V6 2880.80 3050.00 421.07 34.55 386.53 Pass: Major Risk
PB 5 Pad 5-109 S-109 V8 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk
PB 5 Pad S-109 S-109PB1 V2 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk
PB S Pad S-10APB1 S-10APB1 V1 2872.76 3199.96 1348.18 48.50 1299.68 Pass: Major Risk
~-~~~. ~.... -'---_._þ--
. .
Schlumberger
Anticollision Report
Company: BP Amoco Date: 10/112004 Time: 14:52:27 Page: 2
Field: Prudhoe Bay
Reference Site: PB S Pad C4Hlrdinate(NE) Reference: Well: 8-213. True North
Reftr'enc:e Well: S-213 Vertical (l'VD) Refertnèe: 8-213APlan 61.9
Reference Wellpath: Plan S-213A OBd Db: Sybase
Summary
<: Offset Wellpath ..,. Reference Offset Ctr-Ctr NUcGo Allowable
Site Well Wellpath MD MD DistanctMea Deviation Warning
ft ft ft ft ft
PB 8 Pad S-10A 8-10A V1 2873.72 3200.00 1347.74 48.40 1299.34 Pass: Major Risk
PB S Pad S-10 8-10 V1 2872.76 3.199.96 1348.18 48.50 1299.68 Pass: Major Risk
PB S Pad S-110 S-110V18 2870.00 6550.00 4651.88 39.67 4612.21 Pass: Major Risk
PB 8 Pad S-112 S-112 V20 2893.00 3150.00 582.00 36.48 545.52 Pass: Major Risk
PB 8 Pad S-113 S-113 V14 2893.56 3150.00 1528.06 . 45.75 1482.31 Pass: Major Risk
PB 8 Pad S-113 S-113A V3 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk
PB S Pad S-113 S-113B V6 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk
PB 8 Pad S-114 S-114 V13 2892.01 3300.00 1745.06 47.40 1697.66 Pass: Major Risk
PB 8 Pad S-114 S-114A V6 2892.01 3300.00 1745.06 47.25 1697.81 Pass: Major Risk
PB 8 Pad S-115 8-115 STV1 Plan: Plan 2922.45 2900.00 811.20 41.17 770.03 Pass: Major Risk
PB 8 Pad 8-115 8-115V7 2922.50 2900.00 811.15 41.07 770.08 Pass: Major Risk
PB 8 Pad 8-116 8-116V6 2916.24 2800.00 782.12 39.78 742.35 Pass: Major Risk
PB 8 Pad 8-117 S-117V4 2926.49 2850.00 492.13 41.03 451.09 Pass: Major Risk
PB 8 Pad 8-118 8-118V5 4237.72 4150.00 394.20 67.71 326.49 Pass: Major Risk
PB 8 Pad S-119 Plan 8-119A V1 Plan: P 2873.02 4400.00 2971.07 58.88 2912.19 Pass: Major Risk
PB S Pad 8-119 S-119 V3 Plan: Plan #4 2873.02 4400.00 2971.07 48.53 2922.54 Pass: Major Risk
PB 8 Pad S-11 S-11V4 2886.40 3250.00 1413.56 45.69 1367.87 Pass: Major Risk
PB 8 Pad S-11 S-11A V1 2886.89 3250.00 1413.87 45.70 1368.17 Pass: Major Risk
PB 8 Pad 8-11 8-11BV1 2887.16 3250.00 1414.05 45.70 1368.34 Pass: Major Risk
PB 8 Pad S-120 S-120 V4 2942.39 3000.00 1217.48 43.83 1173.65 Pass: Major Risk
PB 8 Pad 8-123 S-123 V10 2876.04 3150.00 1457.13 40.64 1416.49 Pass: Major Risk
PB 8 Pad S-12A S-12A V1 2879.26 3300.00 1609.60 41.35 1568.25 Pass: Major Risk
PB 8 Pad S-12 S-12 V1 2876.24 3350.00 1673.36 43.57 1629.79 Pass: Major Risk
PB 8 Pad S-13 S-13 V1 2883.15 3350.00 1748.65 46.55 1702.10 Pass: Major Risk
PB 8 Pad S-14 Drilling091604 S-14A V 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk
PB 8 Pad 8-14 S-14 V5 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk
PB 8 Pad S-15 S-15 V2 3609.09 3600.04 761.47 63.88 697.59 Pass: Major Risk
PB 8 Pad S-16 S-16 V1 3786.80 3750.00 865.48 81.27 784.21 Pass: Major Risk
PB 8 Pad S-17 S-17 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
P8 8 Pad 8-17 S-17A V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 8 Pad S-17 8-17AL1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 8 Pad S-17 S-17APB1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 8 Pad S-17 S-17B V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 8 Pad S-17 S-17C V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk
PB 8 Pad S-17 S-17CPB1 V2 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk
PB 8 Pad S-17 S-17CPB2 V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk
PB S Pad S-18 S-18 V1 2912.30 2650.00 2187.88 61.21 2126.67 Pass: Major Risk
PB 8 Pad S-18 S-18A V16 2921.24 2650.00 2189.46 61.44 2128.02 Pass: Major Risk
PB S Pad S-19 S-19 V1 3107.07 3050.00 609.87 49.07 560.80 Pass: Major Risk
PB S Pad S-200PB 1 S-200PB1 V4 2877.44 2950.00 297.53 43.84 253.69 Pass: Major Risk
PB S Pad S-2OO S-200 V2 2877.44 2950.00 297.53 43.95 253.58 Pass: Major Risk
PB S Pad 8-201 S-201 V2 2873.65 3700.00 1590.52 43.80 1546.72 Pass: Major Risk
PB S Pad 8-201 S-201PB1 V11 2879.52 3700.00 1587.91 45.59 1542.32 Pass: Major Risk
PB 8 Pad 8-20 S-20 V4 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk
PB 8 Pad 8-20 S-20A V2 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk
PB 8 Pad S-213 S-213 V9 3046.08 3050.00 4.72 40.77 -36.05 FAIL: Major Risk
PB 8 Pad S-215 S-215 V9 8660.10 6930.00 1126.17 129.52 996.66 Pass: Major Risk
PB 8 Pad S-216 S-216 V2 2896.92 2900.00 802.63 42.17 760.46 Pass: Major Risk
PB 8 Pad 8-21 S-21 V1 3203.91 3300.00 720.37 54.95 665.42 Pass: Major Risk
PB 8 Pad 8-22A S-22A V1 3366.54 3350.00 596.94 57.10 539.84 Pass: Major Risk
PB 8 Pad 8-22B 8-22B V2 3366.54 3350.00 596.94 57.21 539.73 Pass: Major Risk
PB S Pad S-22 S-22 V1 3366.59 3350.00 596.67 57.12 539.54 Pass: Major Risk
PB 8 Pad S-23 8-23 V1 3246.07 3300.00 665.69 52.31 613.38 Pass: Major Risk
PB 8 Pad 8-24 S-24 V5 2966.51 3000.00 744.00 42.81 701.19 Pass: Major Risk
PB 8 Pad 8-24 S-24A V1 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk
PB S Pad 8-24 8-24B V2 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk
PB S Pad 8-25APB1 8-25APB1 V2 2881.08 3050.00 745.08 67.79 677.28 Pass: Major Risk
PB 8 Pad S-25A S-25A V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk
PB S Pad S-25 S-25 V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk
PB S Pad 8-26 8-26 V1 2889.85 2950.00 833.32 38.07 795.25 Pass: Major Risk
PB 8 Pad S-27 S-27 V1 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk
PB S Pad 8-27 8-27 A V3 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk
PB 8 Pad 8-27 8-278 V7 2875.81 2950.00 869.73 37.73 831.99 Pass: Major Risk
._---..--_._--..-#.~.~_....- ..,-
. Schlumberger .
Anticollision Report
Company: BP Amoco Date: 10/112004 Time: 14:52:27 Page: 3
Field: Prudhoe Bay
Refer-enee Site: PB S Pad Co-or-dinate(NE) Refer-cnee: Well: S-213, True North
Refer-eote Well: 8-213 Vertical (I'VD) Refer-ente: 8-213A Plan 61.9
Refer-cnec Wellpath: Plan 8-2t3A OBd Db: 8ybase
SummaI")'
< Offset Wellpath ~ Refer-cnee Offset Cu--ctr- No-Go Allowable
Site Well Wcllpath MD MD Distance Ar-ea Dcviation War-ning
ft ft ft ft ft
PB 8 Pad 8-28 8-28 V4 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk
PB S Pad 8-28 8-28A V1 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk
PB 8 Pad 8-28 8-28B V2 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk
PB 8 Pad 8-28 S-28BPB 1 V7 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk
PB S Pad 8-29AL 1 S-29AL1 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk
PB S Pad 8-29A Plan 8-29AL2 VO Plan: 2900.27 3050.00 1429.74 57.24 1372.50 Pass: Major Risk
PB S Pad S-29A S-29A V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk
PB 8 Pad S-29 Plan 8-29B V1 Plan: S- 2900.27 3050.00 1429.74 57.34 1372.40 Pass: Major Risk
PB 8 Pad S-29 8-29 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk
PB 8 Pad S-30 8-30 V1 2900.00 3050.00 1016.14 38.62 977.52 Pass: Major Risk
PB 8 Pad S-31A S-31A V3 3224.79 3700.00 755.81 64.61 691.20 Pass: Major Risk
PB 8 Pad S-31 8-31 V1 3224.79 3700.00 755.81 64.61 691.20 Pass: Major Risk
PB 8 Pad S-32 8-32 V1 2889.28 3200.00 1300.39 45.96 1254.43 Pass: Major Risk
PB S Pad S-33 8-33 V1 2900.00 3100.00 1162.82 39.24 1123.58 Pass: Major Risk
PB 8 Pad S-34 S-34 V1 2879.25 3200.00 1439.74 36.64 1403.10 Pass: Major Risk
PB S Pad S-35 S-35 V1 2874.27 3550.00 1411.58 56.50 1355.08 Pass: Major Risk
PB S Pad 8-36 8-36 V1 2876.35 3300.00 1489.80 38.52 1451.28 Pass: Major Risk
PB S Pad S-37 S-37 V1 2880.94 3350.00 1567.21 39.45 1527.76 Pass: Major Risk
PB 8 Pad S-38 S-38 V1 2876.14 3150.00 1268.58 36.10 1232.48 Pass: Major Risk
PB S Pad S-40A 8-40A V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk
PB 8 Pad S-40 8-40 V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk
PB S Pad S-41L1 S-41L1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk
PB 8 Pad S-41PB1 S-41PB1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk
PB S Pad S-41 S-41 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk
PB S Pad S-42PB1 S-42PB1 V1 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk
PB S Pad 8-42 S-42 V2 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk
PB 8 Pad 8-43L 1 S-43L 1 V2 2870.79 3150.00 647.04 38.61 608.42 Pass: Major Risk
PB S Pad S-43 S-43 V3 2870.79 3150.00 647.03 38.50 608.53 Pass: Major Risk
PB S Pad S-44L 1PB1 8-44L 1PB1 V3 2896.64 2950.00 199.72 35.01 164.72 Pass: Major Risk
PB S Pad S-44L 1 8-44L 1 V5 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk
PB S Pad S-44 S-44 V10 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRlA TE LETTERJP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLNAME¡?1ú ~- 213~ ¿2
PTD# 2Q~ - 2-/ ¡:;
x
Development
Service
CHECK Wß..A T
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
x
(If APJ number
last two. (2) digits
are between 60-69)
Exploration
Stratigraphic
~'CLUEn
Tbe permit is for a new weUboresegmeDt of I
existiDgwen~a ~-~/3A .
Permit No;;'~- ?/?API No. ..'Ý::>-I'J/fi-.2-"2-79'~-"ðl
Production. should continue to be reponed as
a function 'of tbe original API number. stated
above.
HOLE JD accordaDce witb· 20 AAC 25.005(1), an
records, data aDd logs acquired for tbe pilot
hole must be clearly differentiated "in both
name (name OD permit plus PH)
and API number (SO
70/80) from records, data aDd logs acquired
for well (name on permit).
Pn.,OT
(PH)
SPACING
EX CEPTJ ON
DRY DITCH
SAMPLE
The permit is approved subject ·to fuD
comp1iaDce with 20 AAC 25.055~ Approval to
perforate aDd produce is contingeDt upon
issuance of ~ conservation order approving a
spacing e:Jcepdon. _
(Company Name) assumes tbe liability of aDY
protest to the spaciDg .eJception tbat may
occur.
AU dry ditch sample sets submitted to tbe
Commission must be in no greater 1ban 30'
sample intervals from below tbe permafrost
or from where samples are first caught aDd
10' sample inter-vals through target zones.
~i!!'~~~'" .~ Field & Pool PRUDHOE BAY. POLARIS OIL - 640160
Administration
Well Name: PRUDHOE BAY UN POL S-213AL2
PTD#:2042160 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L GeoArea 890 Unit 11650
1 Permittee attache~t _ _ . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2 _Lease_number _apRropriale _ _ _ _ _ _ _ . _ _ _ _ Yes _
3 _U_nique well_n_a!T1e_a[1d olÆmb_er _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . _ . _ _ _ _ _ _ _ . _ . _ . . . _ _ Yes _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . . . . . . _ _ _ _ _ _ _ _ . _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ . . _ . _ . _
4 WellJQcated in.a.d.efjoedpool . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ . . . . . . Yes SEE ,t\PD fORS-2123A 204:213 fORADISGU.SSIQN Of SP,t\CING, _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . .
5 WellJQcated pr.oper distance_from driJling unitb_ound_ary _ _ _ _ _ _ _ _ _ . . . . . . . _ Yes _ . _ _ _ . _ . . . . . . . . . . . _ . _ _ . . . .
6 WelUQcated proper distance_ from otber weUs. . . . _ . . . . . . . . . . . . . . _ _ _ _ _ _ _ _ _ Yes _ . . _ . . . . _ . _ . . . . . _ _ _ _ _ _ _ _ _ _ . . . . . .. ·...... _ . . . . . . _ _ _ _
7 .S_uffjcientacreage_aYailablein drilliogunjL . _ _ _.... _.. .Yes. . _ _ _ _ _ _ _ _.. _. _....... _. ....._
8 Jfdevi<!ted. js. weJlbQre platjoclu.ded . . . . _ _ . Yes. . . . . . . . _ . . . . . . . . . . . _ _ _ _ _ _ _ _ _ _ _ . . . . .
9 _Qperator onl}' affected party. . . . . . . . . _ . . . _ . . . _ _ _ _ _ _ _ _ _ _ . _ _ _ . . Yes _ . _. ... . . _ . _ . . . . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _
10 _Operator bas.appropriate.b.ond inJorce . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ . _ _ _ _ . . _ _ _ . . Yes _ _ _ _ _ . . _ . . _ _ . _ _ _ _ _ . _ _ _ _ _ _ . _ . . _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . .
11 Permit c.a[1 Þe iSSlÆed witbQut co.nservaJioo order _ . . .Yes .
Appr Date 12 Permit c.al1 Þe iSSlÆed witbQut admioistratilleapprpvaJ _ . _ . _ _ . . . . . . . Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . . .
RPC 10/26/2004 13 Can permit be approved before 15-day wait Yes
14 WellJQcated within <!rea and strata .authorized byJl1jectioo Order # (putlO# in_cpm!T1.el1tsUfor. Yes. . . . . . . . . . . . . . . . _ . . . . . . . . . . . . .
15 _AJI wellsJlvitNnJI4J'uile_area_of review ideotified (For servjc.ew.e!l ool}'L _ _ _ . _ _ _ . _ _ _ _ _ _ Yes _ _ _ _ _ . . . _ . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ . .
16 Pre-produ.ced injector; ~uraliQn.of pre-pro~uctioo less than 3 mootbs. (for_service well onJy) _ . Y.es _ . . _ . . . . . . . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ . . . . . . . . _ . _. _. _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . .
17 .AGMP Fïnding ofCon,Si,Slencyhas Þeenissuedfor!bis project _... _ . . _ . _ . . . . . Yes _ . . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ . . . . _ . . . . . . _ .
18 .C.ol1du.ctor stöngprQvided _ _ . _ _ . . . . . . . .NA _ . . . . . .. .... _ _ . . _ _ . _ _ _
19 _S_ul'facec<!singpJotects alLknown USDWs _ . _ . . _ . . . . . . . . . . . . NA _ _ . . . . _ _ . . _ . . . . . . _ . . . _ .
20 _CMT v_ol adeQlÆate!o circulateo_ncooductor. & SUJtCJ>g . . . . . . . . . . _ . . _ _ _NA _ _ _ _ . . . . . . . . . . _ .
21CMT vol adeQuate!o tie-inJongstril1g tosul'f csg . . . _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . . . . _ _ _ . . . _ . . . . . _ .
22 _CMT will coyer_aU kOQwn.pro.ductiYe bQri~ons. _ . _ . . . . _ _ _ _ _ _ _ _ _ _ No_ _ _ . _ _ . . Slotte.dc . . . . . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ . _ . . . . . . _ _ . . _ . . _ _ . . . . _ _ _ _ _ _ _ _ . _ . _ . .
23 .C_asil1g de.sig[1S adeçua_te for C.J:, B .&. permafr.ost _ Yes. _ .. ...... _ . . _ . _ _ _ _ _ _ _ _ _ _ . . . _ . . . . _ . . . . . . . . _ _ _ _ . . . . . _
24 A~equaletankage_oJ re_serve pit. _ _ _ . _ _ _ _ . _ _ . . . . . . . . . . . . _ .. _ _ . . _ . _ _ Yes _ _ _ _ _ _ . Doypo 16. _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . . . _ . . . . . _ . . . _ _ _ _ _ _ _ . .
25 JtaJe-~rilt has a 10-403 fQr abandonment beel1 aPPJoved _ _ . . _ . _ _ _ _ _ _ _ _ . . . . . . . NA . . _ . . La_ter<!1. _ _ _ _ _ _ _ . _ . . _ _ . . . _ _ . . _ _ . . . . .
26 A~equale-,^"e!lbore sep<!ratio_n_proposed. _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . Yes _ _ _ _ . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . .
27 Jtdiv~nter req.uired, dQes it meel reguJatioos_ . . . _ . _ _ _ NA . _ . . _ . . Sidetrack. _ _ _ _ _ _ _ _ . . . _ . .. . _ . . . . . . _ . . _ _ _ _ _ _ _ _ _ _ _ . . . . . . .
Appr Date 28 _DritliogfJuid.Rrogramsc.hematic.&eq.uipJistadequale _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Yes_ _.... . Max MW_9,2RP9. _..... _.. _ _..... _ _. _ _.... _.
WGA 10/26/2004 29 BOPEs, do they meelreguJatioo _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . . . . . _ . _ . . _ _ . . . . Yes _ _ _ . _ _ . . . . . . . . . . . .
30 _BOPE-Pfessra.til1gappropriate;Jestto.(pu_tpsigin_commeots). _ _ _ Yes _. _.. . Test tp.3500_Rsi.MSf> 1807psÎ. .... _ _.. _ _...... _._
31 _C_hoke.manifold compJies. w/APtRf>-53 (May 84) . _ . Yes. . . . . . . . . . . . _ _ _ _ _ _ _ _ _ _ . . . . . . . . _ _ _ _ _ . _ . .
32 WQrk will occ.ur withoutoperatjonshlÆtdown_ _ _ _ _ _ _ _ _ _ _ . _ _ . . Yes. . . . . . . . . . . . _ _ _ _ _ . _ . . _ . _ . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . _ . _ . . _ _ . .
33 JSRresence.QfH2Sg<!s.Rrob.aÞle. . _ _ _ _ _ _ _ _ _ _ _. _ .. No... _.. _ .f'JoLa[1H2Sp<!d. ......
34 MecbanicaLcoodjt[o[1 pf wells within ,t\OR verified (for.s.ervice welJ onJy) . _ _ _ _ _ NA . . . . . _ _ _ . _ _ _ _ _ _ _ _ _ . . . . _ _
Program DEV
OnlOff Shore On
Well bore seg
Annular Disposal
D
D
- - - - - - - - - - - - --
- - - - - -
- - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - -
.
Engineering
- - - - - - - - - -
e
- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - -
- - - - - - - - - - - - - - - - - --
- - - - - - -
Appr
RPC
35
36
Date 37
10/26/2004 38
39
Permit G.a[1 Þe iSSlÆed w!o. hydrogen. s.ulfide meas.ures. . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes. _ _ . . . . . . . . . . .. _. _ _ _ _ _ _ . _ . . . . . . . _ . _ . . . . . . . . _ . . . _ _ .
_D_ata.preseoted on Rote_ntial overRressure .zone,S _ _ _ . . . _ . _ . . . . . NA . . . . . . . _ . _ . . . . . . . . _ . . _ . . _ _ . . . . . . . _ _ _ _ _ _ _ _ . _ _ _ . .
.Sei'smic.afl<!lysjs. Qf shaJlow gaszPl1es. . _ . _ . . . . . . . . . . . . . . . . _ _ . . . .NA . . . . . . . . . . _ _ . . . . . . . . _ . _ _ . . _ . . . . . .
Seabedconditioo SlÆrvey(if off-shore) . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . NA . . . . _ . . . . . . . . . . . _ . _ . . . . . . . . . . . _ . _ . . . . . . . . . . . . . . _ . . .
_ CQnta.ct nam.elphQneJor.wee~ly progress.reRorts [exploratoryol1ly] . _ _ _ _ _ _ _ _ . . . . . . . NA _ _ . . . . . . . . . . . . . _ . . . . _ _ . . . . . . . . . . . . . . _ _
- - - - - - - - - -
Geology
- - - - - - - - - -
- - - - - - - - -
- - - - - - - - - -
- - - - - - - -
- - - - - --
- - - - - - - - -
Geologic
Commissioner:
Date:
Engineering
Commissioner:
Date
AC
~~"e'
Date
Ow
) Ò )2)~
~~}C