HomeMy WebLinkAbout204-217
· .
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
c2 0 Y- - ~L 7- Well History File Identifier
Organizing (done)
o Two-sided 11111111111 ""1111
o Rescan Needed 1111111111111111111
RES CAN
~olor Items:
o Greyscale Items:
DIGITAL DATA
~skettes, No.1
o Other, No/Type:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Date L/-/I~ 07
o Other::
BY: ~
/s/
VVlf
Scanning Preparation
BY: ~
<"~
Date 4-/1 d-I 07
x 30 = 0/,0
Date Lf-/IB-J 07
11/11111111I1111111
Project Proofing
BY: ~
/5/
YV1f
+ 5" = TOTAL PAGES 0;$
(Count does not include cover sheet) VV/t)
/s/ I
11111111111111" III
Production Scanning
Stage 1
Page Countfrom Scanned File: q /¡;
Page Count Matches Number in Scanning Preparation:
~ Date: 4-) I d-jo7
If NO in stage 1, page(s) discrepancies were found:
(Count does include cover sheet)
VYES
Stage 1
YES
NO
/s/ mp
NO
BY:
BY:
Maria
Date:
/s/
111/1111111I /111111
Scanning is complete at this point unless rescanning is required.
ReScanned
11/11111111111 "III
BY:
Maria
Date:
/s/
Comments about this file:
Quality Checked
1111111111111111111
10/6/2005 Well History File Cover Page.doc
• •
{.~ ~ .
'• ~
03~o~~zoos
DD NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:1LaserFiche\C~rPgs_InsertslMicrofilm Ma~er.doc
~~
DATA SUBMITTAL COMPLIANCE REPORT
3/12/2007
Permit to Drill 2042170
Well Name/No. PRUDHOE BAV UN POL S-213AL3
Operator BP EXPLORATION (ALASKA) INC
Spud ,/J JIM- )¡óÐ ~
API No. 50-029-22993-63-00
MD
12054/
TVD
5016 /
Completion Date 2/3/2005,/'
Completion Status
1-01L
Current Status 1-01L
UIC N
- _._----_._.._._-~_._-_.- ..- -----_._._._~_.^------_...~
----^._~---~
--_.'--'..~-_._-_."'._-~._--~.._-~-_._~-"-----."--".-~
___··__·,o.___·._·."____~__~..·____ _____~~.~__~__.__~___~_~._._~~____~.._.___"~__,_____ ~__~_.______..___~_..__~_.____,____.__.__~~._.__~___.____'_.'._
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Ves
---_..__.._._-,._---._.._--_._._.._-~-_..~-----~~._...'-'--'-"'-"-'~
--~-_.._-------_.._--
-~-_.._..__._--_..._-------_._.-._._.~_._-
___~__._..____~____________________.^~"__..._~"_~__.____..__~,.___ --,------·.---·.------..--_._.'·0.____--··-.---·.....-.____..._....____.,.____
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR / RES / Azimuthal Den / NEU / AIM / PWD
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint
Log/
Data
:z
14t
¡Y9
~Og
I
~.. C.. Lis
Electr
Digital Dataset
Med/Frmt Number Name
-- _..--_. ......-- --~----".._--- .----
D Asc Directional Survey
Log Log
Scale Media
Run
No
Interval OH /
Start Stop CH
-~--_.._--_.._--_._--_._-_.-
o 12054
e
----~._....--------",..--._-_._-'----
-_._.._-~_.__._-----------_._--
Received Comments
_ _"M~__~___~___
4/1/2005
Directional Survey
14322 Induction/Resistivity
0 12054 4/1/2005
25 Blu 2856 12054 Open 1/10/2007 MD Vision Service FINAL
27 -Jan-2005
~/)" Blu 2856 12054 Open 1/10/2007 TVD Vision Service FINAL
27 -Jan-2005
2755 6880 Open 1/10/2007 LIS Veri w/Graphics
14322 Induction/Resistivity
14322 Induction/Resistivity
--- - ---.__..__...__...,------_.~---_..~._---
-"-------..-.-..-----..,.--..-
-~----~_._.-.-
~____.m___~·..~_
-~-_._-...".~---_.--._------,,--.. -------".-------
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
Formation Tops
@/N
ff)N
.
ADDITIONAL INFORMATION
Well Cored? vI@,
Chips Received? Y / N J
Daily History Received?
Analysis
Received?
~
___.... _~__.._.__ .. _____.__..___._._~.._ __,__.___,._."____,_______~___.___._____._~_~..______..________ _·__~..__~·_.o_~___~___·."_·__o__...._____.._.___..__"
_m_____._____.___
___."____~_...___..."_.~~___..,,.___~_._..______~__.,,____~____"...______._____. _..____.-____....-,,__~___~ _______.._..~·__m__.________..___...___·_____._________"_ _______....._____._____~_.......______
Comments:
~:~;li:;::~~:Vi::~d·~~:=-~···=~=-=~==---=~~=-···· ...:==:==-==:=-==c:===-====~===~~:t:~'- TJt;-~~65=·~·~C=··
Schlumberger
Schlumberger·DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
Well
L-212
S·213AL 1
S-213AL 1-01
S-213AL2
S-213AL3
6)6</- 911- -rt }43d';;)
Job #
Log Description
11039112 CH EDIT USIT (PDC·GR
40011201 OH EDIT MWDILWD
40011201 OH EDIT MWDILWD
40011201 OH EDIT MWD/LWD
40011201 OH EDIT MWD/LWD
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc
Petrotechnical Data Center LR2-1
900 E Benson Blvd
Anchorage AK 99508-4254
Date Delivered"
04118/05
12/20/04
12/25104
01108/05
01/27105
01/08/07
NO. 4105
Company: Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Polaris
Orion
Date
BL
Color
CD
2
2
2
2
.
Schlumberger-DCS
2525 Gambel! St. Suite 400
Anchorage. AK 99503-2838
A TTN Beth
Received by
.
.
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman
Well No S-213AL3 Date Dispatched: 1O-Mar-05
Installation/Rig Doyon 16 Dispatched By: 0
Data No Of Prints No of Floppies
Surveys
2
Received By:
1ÄJ OJ¡J
Please sign and return to:
Drilling & Measurements LWD Division
3940 Arctic Blvd. Suite 300
Anchorage. Alaska 99503
nrose1@slb.com
Fax: 907-561-8417
LWD Log DeliveryV1.1, 10-02-03
Schlumberger Private
~ûY-2( )
. STATE OF ALASKA .
ALASKA· AND GAS CONSERVATION COM ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
RECEIVED
1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD / GR / RES / Azimuthal Den / NEU / AIM / PWD
CASING, LINER AND CEMENTING RECORD
SElTlNG DEPTH MD SETTING DEPTH TVD HOl-E
Top BoTTOM Top BoTTOM SIZE
Surface 110' Surface 110' 30"
28' 2859' 28' 2829' 12-1/4"
24' 5985' 24' 5050' 8-3/4"
5945' 11084' 5030' 5008' 6-3/4"
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM
Top of Productive Horizon:
2997' NSL, 1199' WEL, SEC. 34, T12N, R12E, UM (OA)
Total Depth:
2362' SNL, 1340' WEL, SEC. 03, T11 N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x-_ 618930 . y- 598055~_ Zone-~~~
TPI: x- 616975 y- 5979170 Zone- ASP4
Total Depth: x- 616926 y- 5973810 Zone- ASP4
_______________n_~__ ._________~______..____.
--~---~------
18. Directional Survey 181 Yes 0 No
22.
CASING
SIZE
WT. PER FT.
94#
40#
29.7#
12.6#
GRADE'
L-80
L-80
L-80
L-80
20"
9-5/8"
7-5/8"
4-1/2"
23. Perforations oRen to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Section
MD TVD MD TVD
6541' -11803' 5081' - 5016'
25.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect w/ 100 Bbls of Diesel
One Other
5. Date Camp., Susp., or Aband.
2/3/2005
6. Date Spudded
1/23/2005
7. Date T.D. Reached
1/27/2005
8. KB Elevation (ft):
61.82'
9. Plug Back Depth (MD+ TVD)
12054 + 5016
10. Total Depth (MD+TVD)
12054 + 5016
11. Depth where SSSV set
(Nipple) 2255' MD
19. Water depth, if offshore
N/ A MSL
24.
SIZE
4-1/2",12.6#, L-80
1 b. Well CMAA 18 zoos
181 Development Exploratory
Äiàj}fiitYf~l¥is ~n~t'b1fimiB8ion
12. Permit to Ii>dU.NuQ1þer
204-217 RnCnOrøye
13. API Number
50- 029-22993-63-00
14. Well Name and Number:
PBU S-213AL3
15. Field / Pool(s):
Prudhoe Bay Field / Polaris Pool
Ft
Ft
16. Property Designation:
ADL 028253
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Appro x.)
CEMENTING RECOAD
260 sx Arctic Set (Approx.)
440 sx AS Lite III, 215 sx Class 'G'
229 sx Class 'G'
Uncemented Slotted Liner
AMOUNT
PUl-l-EO
DEPTH SET (MD)
5961'
PACKER SET (MD)
5844'
26.
Date First Production:
March 8, 2005
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED +
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
Oll-Bsl GAs-McF WATER-Bsl
Oll-Bsl
r"~·:-:-~·-:,-~':
None ,';;'.
.~ z-J)~_
Form 10_40~~1_T2t2003
GAs-McF
WATER-Bsl
ORIGINAL
CONTINUED ON REVERSE SIDE
CHOKE SIZE I GAS-OIL RATIO
Oil GRAVITY-API (CORR)
RBDMS BFl MAR 1 4 2005
if
o
28. GEOLOGIC MARKER.
NAME MD
Schrader Bluff OA 5996'
Schrader Bluff OBa 6135'
Schrader Bluff OBa 6430'
Schrader Bluff OA 6862'
Schrader Bluff OA 7053'
Schrader Bluff OA 11838'
29.
eRMATION TESTS
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
TVD
5055'
None
5105'
5104'
5057'
5055'
5016'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I ~erebY certify that the f%in~ is true and correct to the best of my knowledge.
Signed Terrie HUbble-'1efv'\lP ~ ~ Title Technical Assistant Date 03 -I V -os
PBU S-213AL3 204-217 Prepared By Name/Number: Terrie Hubb/e, 564-4628
Well Number Drilling Engineer: Michae/ Tri%, 564-5774
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
Submit Original Only
S-213A MDT
Client BP Exploration Inc Tool pa/ps/lf/scl 'Jo/sc/po/sc/sc/ms/pc
Well S-213A Spec D,weather
Date 11/29/04 SO
File Time Depth Zone Tool TVD Temp Pretest Mob B.afore Formation After Flow presure PumpV pump time Test Typa/còmment '.
5 12:14 5176 ps 90 20 2296 2158 2295 tool check
7 correlation 15
8 correlation
19 14:30 5531 Mb1 ps 94 20 2.4 2340 2293 2339 çood test
21 15:00 5630 Mb2 ps 94 20 2387 lost seal could not hold set persure
22 15:20 5631 Mb2 ps 94 20 2383 lost seal could not hold set persure
24 15:30 5728 Mc ps 95 20 4.1 2425 2198 2411 çood test
25 1600 5744 Mc ps 95 20 2425 lost seal could not hold set persure
26 16:15 5745 Mc ps 96 20 2418 2414 lost seal
27 16:29 5747 Mc ps 96 20 108.2 2427 2200 2416 çood test
28 16:50 5748 Nb ps 96 20 2449 los seal
29 17:03 5849 Nb ps 96 20 17.1 2446 2114 2443 çood test
30 17:30 6000 Oa ps 97 20 38.9 2492 2081 2483 çood test
31 17:40 6031 Oa ps 97 20 2500 2491 lost seal
32 17:50 6032 Oa ps 97 20 2493 lost seal
33 18:00 6060 Oa ps 98 20 8.2 2505 2110 2494 çood test .
34 18:20 6117 Oba ps 98 20 2509 lost seal
35 18:40 6118 Oba ps 98 20 2511 2507 lost seal could not hold set persure
36 19:00 6214 Obb ps 99 20 2535 2524 lost seal
37 19:22 6215 Obb ps 99 20 2527 2523 lost seal
38 19:37 6235 OBb ps 100 20 30.9 2539 2062 2524 çood test
39 19:55 6247 OBb ps 100 20 8.8 2542 2067 2525 çood test
40 21:00 6402 Obc ps 100 20 2565 2554 dry test
41 21:00 6403 Obc ps 100 20 2556 2549 lost seal
42 21:27 6424 Obc ps 101 20 2567 2551 lost seal
43 21:40 6525 Obc ps 101 20 2556 2550 lost seal
45 2145 6491 Obc ps 102 20 2565 2559 lost seal
46 21:56 6492 Obc ps 102 20 2565 2556 dry test
47 22:05 6496 Obc ps 102 20 2569 2555 dry test
48 22:12 6497 Obc ps 102 20 2563 2556 lost seal
49 22:24 6498 Obc ps 102 20 2563 2555 dry test
50 23:21 6824 Obd ps 103 20 2600 2581 lost seal
51 23:32 6825 Obd ps 103 20 2593 2582 lost seal
52 23:47 6820 Obd 103 20 2577 2577 çood test
, ·MRSc-,2.4S, ,.... .... .,...... .
"N ',jgal;OilSample'.
59 8:13 2555 2559
60 9:54 6491 Obc pa 101 2568 2558
61 11:20 6424. 2581 2556
'2543: "F:'X,';,
700 to 120
700 to 50
700 to 50
27
15795 .'.
60.
'30
.' ::·15OOto':l900:; . ;,c. '.' ','60
. "' . . . '" ':, pump up !d 4000 psl.···
. ·1 60
pump ~pío 4000psi;' ,
"50895.,.·J. 9Ó'
þump up to. 4000 psi.
',·;·90675,: I· " 80""
pumÞ uPt~ 40Q0 psi ....'
. i';" 1::75'.
pump up to 4000 psi'
.
. coUld not flow
CoUld not flow
could not flow,
. MP.SR.1398·
. . 450 cc oil'sample
,,:;. MPRS~1399.:·
::: 450 CC 011 Sat\Ïplé :
'.
",450 ccòil sample.
'. ·c. MPSR-14oo,:'
, MPSR-1401....·
. 450 cè,oI·Sámple·
'" ,.MPSR-1402. .....
. 450 cè 011 and Water s. .
S-213A MDT Fluid Properties
Sample ID Cylinder # Depth Sand GOR Molar Mass Density API
(ft) sef/stb (g/ee)
1.01 CSB 7759-QA 6,824 OBd 310 268.3 0.91 24.1
1.02 CSB 7763-QA 6,824 OBd 307 269.1 0.91 24
1.04 CSB 7476-MA 6,177 OBa 234 332.5 0.941 18.8
1.05 CSB 7735-QA 6,177 OBa 225 333.2 0.942 18.8
gas and water/filtrate
1.07 CSB 7753-QA 6,000 OA-Upper 15,670 175 0.836 37.7 only - no oil .
1.08 CSB 7755-QA 6,403 OBe 291 263 0.907 24.5
1.09 CSB 7690-QA 6,247 OBb 260 282.7 0.917 22.8
1.10 CSB 7761-QA 6,059 OA-Lower 212 308.9 0.936 19.7
1.11 CSB 7725-QA 5,747 Me 194 457.9 0.972 14
1.12 CSB 7680-QA 5,531 Mb1 203 480.4 0.98 12.9
.
Legal Name: 8-213
Common Name: 8-213
1/3/2001
11/25/2004
12/8/2004
FIT
LOT
FIT
2,858.0 (ft)
2,856.0 (ft)
6,870.0 (ft)
2,838.0 (ft)
2,828.0 (ft)
5,265.0 (ft)
10.50 (ppg)
9.20 (ppg)
9.00 (ppg)
300 (psi)
820 (psi)
411 (psi)
1,848 (psi)
2,172 (psi)
2,873 (psi)
12.53 (ppg)
14.78 (ppg)
10.50 (ppg)
.
.
Printed: 2/7/2005 9:37:38 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11/17/2004 05:00 - 07:00 2.00 MOB P PRE Move rig off from J-02b.
07:00 - 07:30 0.50 MOB P PRE Pre-move safety meeting with Tool Service, Security and all rig
personnel reviewing pre-move route inspection and all rig move
107:30 - 15:00 hazards.
7.50 MOB P PRE Move rig from J-Pad to S-Pad.
Security stopped rig move for 2 hrs to clear the road allowing
personnel to respond to Z-Pad.
15:00 - 00:00 9.00 MOB P PRE Work on cellar door and flowline mods
11/18/2004 00:00 - 00:00 24.00 MOB P PRE Continue rig mods, cellar doors and flow line. Install vacuum
system lines and controls.
11/19/2004 00:00 - 04:30 4.50 MOB P PRE RD flowline platform and scud launcher.
04:30 - 12:00 7.50 MOB P PRE Spot rig over S-213. Spot and RU pit, pump and generator
modules.
RIG ACCEPTED @ 12:00 HRS
12:00 - 13:00 1.00 I WHSUR P DECOMP RU to tree to circulate.
13:00 - 15:30 2.50 KILL P DECOMP Take on seawater. RU scaffolding in cellar. Berm rig.
15:30 - 16:30 1.00 WHSUR I P DECOMP PJSM. RU DSM and pull BPV through lubricator. RD DSM.
16:30 - 17:00 0.50 WHSUR P DECOMP Hold pre-spud meeting with crew and all service personnel.
Review well hazards and SOR.
17:00 - 20:00 3.00 KILL P DECOMP RU lines and pressure test to 2900 psi. Reverse circulate 20
bbls through choke using cellar manifold to remove freeze
protect diesel from the tbg. Started taking mixed diesel and
crude oil returns to cuttings box. Switched manifold and
circulated a 40 bbl detergent sweep surface to surface holding
100-150 psi choke pressure to circulate diesel out of annulus.
Circulate a second 40 bbl detergent sweep around to clean up
tbg and csg.
20:00 - 21 :00 1.00 KILL P DECOMP Shut in choke and kill lines, monitoring pressure. RD and blow
down lines. 0 pressure, open choke and flow check well for 15
121 :00 - 00:00 minutes.
3.00 WHSUR P DECOMP PJSM. ND tree and adapter flange. Break out tree and set
behind well.
11/20/2004 00:00 - 01 :00 1.00 WHSUR P DECOMP Break out adapter flange and set out of cellar behind well.
Enclose rig cellar with tarps.
01 :00 - 08:00 7.00 BOPSUF P DECOMP NU BOPE. Install HCR valves. Hook up choke & kill lines to
HCR valves. NU riser & flow line. RU floor drain lines to flowline
manifold.
08:00 - 08:30 0.50 BOPSUP P DECOMP PJSM with all rig personnel on testing BOPE.
08:30 - 09:00 0.50 BOPSUP P DECOMP RU BOP test equipment
09:00 - 12:00 3.00 BOPSUF P DECOMP Test BOPE to 250 /3500 psi. Unable to test lower pipe rams
with tbg hanger in the hole. Witness of test waived by John
I Crisp with AOGCC.
12:00 - 12:30 0.50 BOPSUP P I DECOMP RD BOP test equipment. Blow down lines.
12:30 - 13:30 1.00 WHSUR P DECOMP PJSM. RU DSM and pull TWC through lubricator. RD DSM
13:30 - 14:30 1.00 PULL P DECOMP RU tbg equipment to pull 3-1/2" completion.
14:30 - 15:00 0.50 PULL P DECOMP MU DP with XO to 4-1/2" NSCT tbg hanger. BOLDS. PU 78k
and unseat tbg hanger. Up weight w/ tbg 77k. Pull hanger to
floor.
15:00 - 16:30 1.50 PULL P DECOMP Break out and LD tbg hanger. MU to tbg and circulate 40 bbl
detergent sweep around while reciprocating tbg
16:30 - 17:00 0.50 PULL P DECOMP PJSM with rig crew on pulling and laying down tbg,
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11/20/2004 17:00 - 23:30 6.50 PULL P DECOMP Pull and LD 3-1/2" completion. Losses averaging 6-7 bph while
pulling tbg.
Recovered:
1- jt 4-1/2" tbg
161 - jts 3-1/2" tbg
3 - GLM's
I 1 - "X" Nipple
1 - 18.71' cut joint of 3-1/2" tbg
123:30 - 00:00 0.50 BOPSUR P DECOMP Monitor well. RU test equipment. Set test plug and fill stack.
11/21/2004 '00:00 - 01 :00 1.00 BOPSUF P DECOMP Test lower pipe rams 250/3500 psi. RD test equipment.
01 :00 - 02:00 1.00 PULL P DECOMP Clear tbg handling equipment from rig floor. Clean rig.
02:00 - 03:00 1.00 CLEAN P DECOMP Install wear bushing. PU BHA #1,6-1/8" clean-out assembly.
03:00 - 08:30 5.50 CLEAN P DECOMP RIH to 5241' with clean out assy picking up 4" DP from pipe
shed. Fill DP and break circulation every 25 stands.
08:30 - 09:00 0.50 CLEAN P DECOMP Wash down from 5241' to tbg stub at 5265'.
5 bpm @ 550 psi
09:00 - 10:00 1.00 CLEAN P DECOMP Circulate 20 bbl detergent sweep followed 40 bbl h-vis sweep.
Continue circulating to get sweeps out of the hole and clean
returns. Losses averaging 6 bph.
[p 5 bpm @ 550 psi
10:00 - 13:00 3.00 CLEAN DECOMP Monitor well - level dropping. POH with clean-out assy
P/U 107k Ibs S/O 105k Ibs
13:00 - 13:30 0.50 CLEAN P DECOMP LD 6-1/8" clean out BHA.
13:30 - 14:00 0.50 CLEAN P DECOMP Service rig, drawworks, crown, blocks and iron roughneck
14:00 - 15:00 1.00 DHB P DECOMP MU HES 7" EZSV bridge plug assembly.
15:00 - 17:30 2.50 DHB P DECOMP RIH to 5220'
17:30 - 18:00 0.50 DHB P DECOMP Break circulation. POH to 5200 and set EZSV.
18:00 - 18:30 0.50 DHB P DECOMP Pressure test EZSV to 1000 psi.
18:30 - 20:30 2.00 PXA N CEMT DECOMP Circulate while waiting for cement to be re-batched and sent to
location. Testing of original cement showed a two hour set
time, was sent back to the plant to be re-blended with a
minimum 3 hr set time.
20:30 - 21 :00 0.50 PXA P DECOMP PJSM with Schlumberger, MI, Veco and all rig personnel on
mixing and pumping cement.
21:00 - 21:15 0.25 PXA P DECOMP Pump 5 bbls water to fill lines. pressure test cement lines to
3500 psi.
21:15 - 21:30 0.25 PXA P DECOMP Batch mix and pump 11 bbls (66 sxs) 15.7 ppg, Arctic Set I
cement. Chase with 10 bbls of water behind cement to flush
lines.
21 :30 - 22:00 0.50 PXA P DECOMP Switch to rig pump and displace cement with 49 bbls seawater.
22:00 - 22:30 0.50 PXA P DECOMP POH with 5 stands to 4700'
22:30 - 23: 15 0.75 PXA P DECOMP Circulate clean seawater around to ensure DP is free of
cement.
5 bpm @ 300 psi
23:15 - 00:00 0.75 PXA P DECOMP Displace well to 9.5 ppg used LSND mud.
5 bpm @ 490 psi
11/22/2004 00:00 - 02:00 2.00 PXA P DECOMP Pump dry job, blow down top drive. POH with setting tool
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11/22/2004 02:00 - 04:00 2.00 PXA P DECOMP MU EZSV #2 and RIH to 3155'
04:00 - 04:30 0.50 PXA P DECOMP PU to 3150' and set EZSV.
P/U 84k Ibs S/O 80k Ibs
04:30 - 06:00 1.50 PXA P DECOMP Blow down top drive and POH with setting tool.
06:00 - 07:00 1.00 STCTPL P DECOMP Pull wear bushing and rig up double valve on 9-5/8" X 7"
annulus.
07:00 - 09:00 2.00 STCTPL P DECOMP MU BOT csg cutter assembly and RIH to 2950'
09:00 - 10:00 1.00 STCTPL P DECOMP Position cutters @ 2950'. Cut 7" csg.
10:00 - 11 :00 1.00 STCTPL P DECOMP Establish circulation through 9-5/8" X 7" annulus. Circulate -50
bbls dead crude out of well.
11 :00 - 13:30 2.50 STCTPL P DECOMP Displace annulus to hot seawater followed by 100 bbl detergent
sweep. Then displace annulus to 9.4 ppg LSND mud
.4 bpm @ 950 psi
13:30 - 14:00 0.50 STCTPL P DECOMP Pull 1 stand, MU spear assembly and spear 7" csg. BOLDS
14:00 - 15:00 1.00 STCTPL P DECOMP Pull of to 350k Ibs, establish circulation and work casing pulling
up to 375k Ibs. Able to pull csg 3' up hole.
15:00 - 16:30 1.50' STCTPL P DECOMP Attemp to work casing back down. Able to work hanger down to
1.5' above ring.
16:30 - 17:00 0.50 STCTPL P DECOMP Release spear. LD spear assy.
17:00 - 19:00 2.00 STCTPL P DECOMP POH and LD csg cutter assembly.
119:00 - 21:30 2.50 STCTPL P DECOMP PU spear assy and spear 7" csg. Establish circulation, 4 bpm
I @ 450 psi. Work casing picking up to 375k Ibs. Work csg 5'
uphole. Packing off, no returns. Continue working csg picking
up to 400k Ibs and attempting to regain circulation. NO
progress. Un spear and LD spear assy.
21 :30 - 23:00 1.50 STCTPL P DECOMP PU csg cutter and RIH to 2915'.
23:00 - 00:00 1.00 STCTPL P DECOMP Rig service, inspect top drive.
11/23/2004 00:00 - 00:30 0.50 STCTPL P DECOMP Pump cutter knives open, RIH and tag csg collar at 2913'. PU
l' to 2912' and cut csg. Cut at 2912',53' below 9-5/8" csg
shoe.
00:30 - 02:00 1.50 PXA P DECOMP Pump dry job, blow down top drive. POH with csg cutter assy.
02:00 - 02:30 0.50 STCTPL P DECOMP PU csg spear and change out grapple. RIH and spear 7" csg.
02:30 - 03:00 0.50 STCTPL P DECOMP PU to 375k, attempt to establish circulation, packed off.
Continue working csg, attempting to circulate. Csg finally came
free at 395k Ibs. Establish circulation, 3 bpm @ 300 psi.
03:00 - 03:30 0.50 STCTPL P DECOMP CBU 4 bpm @ 300 psi.
03:30 - 04:00 0.50 STCTPL P DECOMP Pull csg hanger to the rig floor. Rig up csg equipment while
circulating, 4 bpm @ 300 psi.
04:00 - 04:30 0.50 STCTPL P DECOMP break out and LD csg spear. Blow down top drive. CO
elevators.
04:30 - 05:00 0.50 STCTPL P DECOMP PJSM with all rig personnel on breaking out and laying down
csg.
05:00 - 10:30 5.50 STCTPL P DECOMP Pull and UD 69 jts of 7" csg, 29' of cut off jt, casing pup below
hanger
10:30 - 11 :30 1.00 STCTPL P DECOMP UD casing equipment, P/U spear, make service breaks, UD
spear
11 :30 - 13:00 1.50 CLEAN P DECOMP Clear and clean floor.
13:00 - 14:00 1.00 CLEAN P DECOMP Service rig and topdrive, lubricate and inspect crown.
14:00 - 15:30 1.50 CLEAN P DECOMP Change out saver sub on topdrive.
15:30 - 17:00 1.50 WHSUR P DECOMP Install double valve, flange and gauge on OA annulus.
17:00 - 20:00 3.00 REMCM-P DECOMP P/U 30 jts of 3.5" tubing, RIH with 4" DP, tag EZSV at 3,150',
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11/23/2004 17:00 - 20:00 3.00. REMCM-P DECOMP pull up to 3,143' UD joint of DP.
20:00 - 20:30 0.50 I REMCM-P DECOMP M/U TIW valve and cement hose, CBU 5 bpm @ 300 psi, up WI
= 75k, dn WI = 75k, held PJSM with all rig personnel
andcementers, while circulating,
20:30 - 21 :00 0.50 REMCM-P ! DECOMP Pump 5 bbls water and test lines to 2,500 psi, pump remaining
13 bbls at 5 bpm @ 360 psi, pump 65 bbls 17 ppg class G
cement, 5 bpm 320 psi, pump 2.5 bbls water behind, and
displace cement with rig pumps at 5 bpm 250 psi, pumped
calculated strokes to balance plug, 15 bbls, 176 strokes. CIP
@ 21 :00 hrs.
21 :00 - 21 :30 0.50 REMCM-P I DECOMP POH slowly to 2,174'
21 :30 - 22:30 1.00 REMCM-P i DECOMP M/U topdrive, break circulation @ 1 bpm, increased rate to 6.5
bpm 270 psi circulate hole clean, no cement to surface.
22:30 - 23:30 1.00 REMCM-P DECOMP Pump dry job. POH to 955'
23:30 - 00:00 0.50 REMCM-P DECOMP R/U and lay down 3.5" tubing.
11/24/2004 00:00 - 01 :00 1.00 REMCM-P DECOMP Continue laying down 30 joints 3.5" tubing
01 :00 - 02:00 1.00 REMCM-P DECOMP Rig down tubing handling equipment, Install wear ring, Clean
floor
02:00 - 05:00 3.00 I REMCM-P DECOMP Pickup 3 DCs, 14 joints 4" HW, Jars, and 39 jts 4" DP.
05:00 - 06:00 1.00. REMCM-P DECOMP POH stand back 13 stands DP 5 stands HW.
06:00 - 06:30 í 0.50 I REMCM-P DECOMP Make up 8 3/4" milltooth bit, clean floor
06:30 - 07:30 I 1.00 REMCM-P DECOMP RIH with clean out assembly to 1,990'
07:30 - 09:30 I 2.00 REMCM-P DECOMP Circulate @ 1,990' 2 bpm, 130 psi, while wait on cement.
09:30 - 12:00 2.50 REMCM-P DECOMP Wash from 1,990' tag top of cement at 2,203', Drill cement
from 2,203' to 2,285', 10-25k wob, 410 gpm, 670 psi, 80 rpm,
torque 3-4k, 40-60 fph.
12:00 - 21 :30 9.50 REMCM-P DECOMP Continue drilling cement from 2,285' to 2750' 20-28k wob, 415
I gpm, 700 psi, 80 rpm, torque 4-5k, 40-60 fph. up WI = 95k, dn
WI = 85k, rt WI = 90k
21 :30 - 22:00 0.50 REMCM-P DECOMP Circulate bottoms up, 415 gpm @ 700 psi.
22:00 - 23:00 1.00 REMCM-P DECOMP POH with clean out assmbly
23:00 - 00:00 1.00 REMCM-P DECOMP Break bit, stand back DCs.
11/25/2004 00:00 - 03:30 3.50 CLEAN P DECOMP Make up 8 3/4" drilling assembly, orient MWD and motor,
PJSM handling sources, load sources and pickup remaining
BHA, surface test MWD at 640', flow rate 460 gpm @ 875 psi.
03:30 - 04:30 1.00 CLEAN P DECOMP RIH with 8 3/4" drilling assembly, position Ghost reamers @ +/-
1,000 and +/- 2,000' per directioal driller, continue RIH to 2694'
04:30 - 05:00 0.50 CLEAN P DECOMP Make up topdrive, break circulation, wash from 2,694' to 2,750'
380 gpm 710 psi.
05:00 - 06:30 1.50 CLEAN P DECOMP Drill cement from 2,750' to 2856' 380 gpm, 780 psi, 50 rpm,
torque 4500 ftllbs. 80 to 90 fph.
06:30 - 12:00 5.50, STCTPL P DECOMP Time drill off cement plug, from 2,856' to 2,886', 3 fph for 3',5
fph for 10',10 fph for 17' maintaining a 15L toolface, 390 gpm,
1,240 psi on bottom, 1,100 psi off bottom, up WI = 97k, dn WI =
95k
12:00 - 14:30 2.50 STCTPL P DECOMP Continue drilling from 2,886' to 2,932', maintaining 50 psi
differential pressure on motor, holding 15 to 20L toolface,
began rotating from 2,932' to 2,962', 2k wob, 60 rpm, torque
I 4.5k, 425 gpm, 1,400 psi on bottom, 1,280 psi off bottom.
'14:30 - 15:30 1.00 STCTPL P DECOMP Displace well to 9.2 ppg LSND mud, @ 425 gpm, 1,260 psi.
15:30 - 16:30 1.00 DRILL P INT1 Pull back inside casing to 2,758', rig up and perform LOT,
2,856 md, 2,828' tvd, mud WI 9.2 ppg, pressure attained 820
psi, EMW 14.7.
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11/25/2004 16:30 - 17:00 0.50 DRILL P INT1 RIH to 2,950' obtain clean hole ECD @ 400 & 600 gpm, 60
rpm, clean hole ECD = 9.53.
17:00 - 21 :00 4.00 DRILL P INT1 Directional drill 8 3/4" hole from 2,962' to 3,463', wob 2-5k, 570
gpm, 1,650 psi on bottom, 1,500 psi off bottom, 60 rpm, torque
5 k on bottom 4.5k off bottom, up wt = 104k, dn wt = 94k, st wt
= 100k, ECD = 9.75. When pumping 600 gpm, losing mud over
shakers, change screens during connection. While making
connection hydraulic hose on topdrive started leaking,
21 :00 - 00:00 3.00 DRILL IN RREP INT1 I POH to 2,789', blow down topdrive, Repair hose on topdrive.
11/26/2004 00:00 - 03:00 3.00 DRILL IN RREP INT1 I Repair topdrive, RIH to 3,463'
03:00 - 12:00 9.00 DRILL Ip INT1 Directional drill 8 3/4" hole from 3,463' to 4,422', wob 2-10k,
570 gpm, 1,830 psi on bottom, 1,730 psi off bottom, 80 rpm,
torque 6-7 k on bottom 4-5k off bottom, up wt = 111 k, dn wt =
100k, st wt = 102k, ECD = 9.95
AST = .70 ART = 3.08
12:00 - 22:30 10.50 DRILL P INT1 'Directional drill 8 3/4" hole from 4,422' to 5,480', wob 10-20k,
550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm,
torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn wt =
110k, st wt = 120k, ECD = 10.04 calculated clean hole ECD =
9.54
22:30 - 23:30 1.00 DRILL P INT1 Pump 20 bbllow vis sweep, followed by 20 bbl high vis
weighted (10.2 ppg) sweep at 550 gpm 1,990 psi, rotating
string 100 rpm, 4.5k torque, pumped sweep in order to keep
ECD at or below the .60 ppg over clean hole limit through this
section.
23:30 - 00:00 0.50 DRILL P INT1 Directional drill 8 3/4" hole from 5,480' to 5,495', wob 10-20k,
550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm,
I torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn wt =
110k, st wt = 120k, ECD = 9.92 calculated clean hole ECD =
9.48
ART = 3.55 AST = .90
11/27/2004 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8 3/4" hole from 5,495' to 6,125", wob 2-1 Ok,
550 gpm, 2,100 psi on bottom, 1,900 psi off bottom, 100 rpm,
torque 6-7 k on bottom 5-6k off bottom, up wt = 135k, dn wt =
115k, st wt = 125k, ECD = 9.90 when sliding 10.04 when
rotating. Having to cycle pumps several times to get survey,
clean suction screens and check pulsation dampner pressure
on both pumps during connection, seemed to help. Continue to
backream slowly on connections to keep ECD within set
parameters.
I .ART= 1.35 AST = 5.72
I
12:00 - 18:30 6.50 DRILL P INT1 Directional drill 8 3/4" hole from 6,125' to 6,485', wob 5-15k,
565 gpm, 2,240 psi on bottom, 2,110 psi off bottom, 100 rpm,
torque 8-9 k on bottom 7-8k off bottom, up wt = 130k, dn wt =
107k, st wt = 116k, ECD = 10.0. Developed leak on topdrive
gear box oil cooler.
ART = .64 AST = 3.46
18:30 - 19:30 1.00 DRILL N RREP INT1 Blow down topdrive, made up circulating head, circulate @ 50
gpm, 240 psi, while trouble shooting problem. Decision was
made to pull to shoe to make repairs.
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
11/27/2004 19:30 - 22:00 2.50 DRILL N RREP INT1 POH from 6,485' to 2,866', pulled 20k over at 5,652' wiped
through one time, no excess drag pulling back through, pulled
to the shoe with no problems. hole took proper fill.
22:00 - 00:00 2.00 DRILL N RREP INT1 Remove oil cooler from topdrive,take to shop for repairs, clean
oil from topdrive and windwalls, clean floor.
11/28/2004 100:00 - 02:00 2.00 DRILL N RREP INT1 Clean rig floor and topdrive, unable to repair oil cooler bypass
I cooler, fill gear box with oil took 10 gallons to fill. Test run
topdrive and check for leaks.
02:00 - 03:30 1.50 DRILL IN RREP INT1 RIH from 2,866' to 6435' no problem filled pipe @ 5,580'
03:30 - 03:45 0.25 DRILL Ip INT1 Make up Topdrive, break circulation, ream from 6,435' to 6,485'
no fill
03:45 - 09:00 5.25 DRILL P INT1 Directional drill 8 3/4" hole from 6,485' to 6,880', 5-7k wob, 545
gpm, 2,340 psi on bottom, 2,240 psi off bottom, 100 rpm, 8-9k
torque on bottom, 6-7k off bottom, up wt = 135k, dn wt = 100k
st wt = 112k, ECD = 9.92. At bottoms up saw some trip gas
LEL 80 ppm.
ART = 1.55 AST = 1.11
09:00 - 09:30 0.50 DRILL P INT1 Circulate bottoms up @ 545 gpm, 2,400 psi, 100 rpm, 8-9k
torque, reciprocate full stand.
09:30 - 13:00 3.50 DRILL P INT1 MAD pass from 6,880' to 5,872', pumping 550 gpm, 2,400 psi,
.100 rpm, 8k torque, 600 fph.
13:00 - 13:30 0.50 DRILL P INT1 RIH fro 5,872' to 6,880' no problem going in hole.
13:30 - 15:00 1.50 DRILL P INT1 Pump 20 bbllow vis sweep, 20 bbl high vis weighted sweep,
575 gpm, @ 2,600 psi, 110 rpm, 9k torque, sweep brought
back a significant amount of cuttings.
15:00 - 19:00 4.00 DRILL P INT1 Monitor well, POH to BHA no hole problems, monitor well at
BHA
19:00 - 22:00 3.00 DRILL P INT1 Rack back HW and jars, RIB DCs, PJSM handling sources,
remove sources, down load MWD, UD bit motor and MWD.
22:00 - 23:30 1.50 DRILL P INT1 Clear floor of all directional tools, clean floor
23:30 - 00:00 0.50 EVAL P INT1 Remove snow from pipe shed ramps, load MDT logging tools
in pipe shed.
11/29/2004 00:00 - 00:30 0.50 EVAL P INT1 Continue loading pipe shed with Schlumberger MDT tools
00:30 - 01 :00 0.50 EVAL P INT1 PJSM with all rig personnel, Co Rep, Toolpusher,
Schlumberger crew, picking up logging tools.
01 :00 - 03:00 2.00 EVAL P INT1 Make up MDT logging tools per Schlumberger representative.
03:00 - 03:30 0.50 EVAL P INT1 Latch up docking head and test logging tools. Rig up wire line
sheave in derrick, make up xo to logging tools.
03:30 - 10:00 6.50' EVAL P INT1 RIH with MDT tools on 4" DP 1 min per/ stand fill DP @ 2,859',
fill every 5 stands in open hole, RIH to 5,293'
10:00 - 12:00 2.00 EVAL P INT1 Pickup single of 4" DP, make up xo's and side entry sub, RIH
with e-line, pumping @ 20 gpm to latch up head.
Up wt = 105k, dn wt = 90k.
12:00 - 12:30 0.50 EVAL P INT1 Test MDT tool string, and side entry sub packoff.
12:30 - 00:00 11.50 EVAL Ip INT1 Logging with Schlumberger, taking pressure samples as
directed by on site Geologist. took a total of 31 samples, 22
attempts failed due to lost seal or dry sample. The 9 samples
that were recorded were from the following depths. Up wt =
140k, Dn wt = 100k.
Mb1 - 5,531'
Mc - 5,728'
Mc - 5,747'
Printed: 2n/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
11/29/2004 12:30 - 00:00 11.50 EVAL P INT1 Nb - 5.849
OA - 6,000'
OA - 6,060'
OBb - 6,235'
OBb - 6,247'
OBd - 6,820'
11/30/2004 00:00 - 22:00 22.00 EV AL P INT1 - Run MDT logs taking fluid samples @ depths per on-site
Geologist. Good fluid samples @ 8 of 11 stations.
6824' - good sample in OBd
6117' - good sample in OBa
6000' - good sample in OA
6496' - no good - OBc
6490' - no good - OBc
6424' - no good - OBc
6403' - good sample in OBc
6247' - good sample in OBd
6060' - good sample in OA
5748' - good sample in Mc
5532' - good sample in Mb1
i-Rig crew trained on vacuum system usage while logging.
- Full derrick inspection completed.
- RA tags inserted in cementralizers on 4 jts of 7 5/8" casing.
22:00 - 22:30 0.50 EVAL P INT1 - POH to 5293'.
22:30 - 00:00 1.50 EVAL P INT1 - R/D side entry sub & XO's.
12/1/2004 100:00 - 00:30 0.50 EVAL P INT1 - Break circ - monitor well.
- Pump dry job - B/D TD.
00:30 - 03:00 2.50 EVAL P INT1 - POH to logging tools.
03:00 - 05:30 2.50 EVAL P INT1 - B/O & UD logging tools.
05:30 - 06:00 0.50 EVAL P INT1 - Clear & clean rig floor.
06:00 - 08:00 2.00 EVAL P INT1 - M/U clean out BHA consisting of: 8 3/4" FDS+VC mill tooth
bit, NB stab w/ float, PWD, MWD, NM XO, NM spiral DC, NM
stab, 2 NM spiral DC's, float / saver sub, jars, XO & 14 jts
HWDP.
- RIH to 830' & shallow test MWD. 450 GPM - 650 psi.
08:00 - 09:00 1.00 EVAL P ilNT1 - RIH w/ BHA on 4" DP to 2821' & fill pipe.
09:00 - 10:00 1.00 EVAL P INT1 - PJSM - slip & cut 85' drilling line.
10:00 - 10:30 0.50 EVAL P INT1 - Service & lubricate rig.
10:30 - 11 :00 0.50 EVAL P INT1 - RIH w/ BHA on 4" DP to 3495'.
11 :00 - 11 :30 0.50 EVAL P INT1 - CBU @ 400 GPM, 770 psi, 40 RPM.
- B/D TO.
11 :30 - 14:00 2.50' EVAL P INT1 - RIH to TD @ 6880' washing down last 90' & breaking circ @
5000'. P/U wt 145K, 5/0 wt 95K on bottom
- Washed & worked through tight spots @ 6063',6120',6250'
& 6821'.
14:00 - 16:30 2.50 EV AL P INT1 - Pump & circ around 20 bbllow- vis weighted sweep followed
by 20 bbl hi-vis sweep @ 600 GPM, 2540 psi, 120 RPM. CBU x
3.
- Monitor well - spot lube-tex pill & pump dry job.
16:30 - 19:30 3.00 EVAL P INT1 - POH w/ clean out assy to BHA - hole slick.
19:30 - 21 :30 2.00 EVAL P INT1 - UD BHA & clear floor.
BOPsu1 P - Drain stack.
21 :30 - 22:00 0.50 INT1 - Pull bowl protector & install test plug.
I i
Printed: 21712005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1211/2004 22:00 - 00:00 2.00 CASE P INT1 - PJSM - CIO upper pipe rams to 7 5/8" .
- Bring 7 5/8" casing tools to rig floor.
12/2/2004 00:00 - 00:30 0.50 CASE P INT1 i-Test door seals to 1,000 psi for 5 min.
- RID test equip't.
00:30 - 01 :30 1.00 CASE P INT1 - Make dummy run wI casing hanger on LJ.
- R/U to run casing.
- Dropped 200T slip segment downhole.
01 :30 - 02:30 1.00 FISH N HMAN INT1 - Discuss options wI Baker, Schlumberger, & Anchorage.
Decision to attempt segment retrieval wI slickline & magnet.
02:30 - 03:30 1.00 FISH N HMAN INT1 - Wait on slickline unit to arrive from DS 15.
1- UD casing tools, set bowl protector, P/U & install short bails &
4" elevators.
, 03:30 - 05:30 2.00 FISH N HMAN INT1 ,- Prepared rig floor for slickline equip't.
- MIU Baker tools - 8" magnet & 3 XO's to 3/4" sucker rod
conn.
- Spot slickline unit & load tools in pipeshed.
05:30 - 08:00 2.50 FISH N HMAN INT1 - PJSM - R/U slickline unit wI lubricator for pressure control.
08:00 - 14:30 6.50 FISH N HMAN INT1 - RIH wI magnet - tagged up @ 2831' WLM & slowly POH - No
fish.
- RIH to 2851' & tagged up - Pushed fish to 2854' & set down
@ 2854' x 3. POH - no fish.
- RIH to 2854' & tagged fish. Pushed & worked fish to 3092'.
POH wI indication of fish on magnet until 2811'. Lost weight.
RIH & tagged up @ 2811'. Could not work past 2811'. POH -
no fish.
- RIH & tagged up @ 2820'. Slowly worked magnet - fish
moving downhole. Tagged up @ 3120' - POH wI good
indication of fish on magnet. Lost fish @ 2958'. RIH to 3250' &
I tag fish. POH wI good indication of fish & lost fish @ 2932'.
RIH & tagged fish @ 3000' & POH to 2932' losing fish @ 2932'
x 5. POH wI Slickline, No Recovery.
14:30 - 15:30 1.00, FISH N HMAN INT1 - CIO slickline assy to LIB. RIH & pushed fish to 3330' in
attempt to obtain impression of fish. POH & UD LIB wI slight
impression of fish, nothing conclusive.
15:30 - 17:30 2.00 FISH N HMAN INT1 - MIU grabber tool assy & RIH. Push fish to 3800' & attempt to
1.001 FISH latch fish. Hole getting sticky - POH - no fish.
17:30 - 18:30 N HMAN INT1 - PJSM - RID slickline.
18:30 - 20:30 2.00 I BOPSUP P INT1 - PJSM - drain stack, pulled bowl protector & installed test plug.
- CIO top pipe rams from 7 5/8" to 3 1/2" x 6" variables.
20:30 - 21 :00 0.50 BOPSUF P INT1 - PJSM - R/U test equip't.
21 :00 - 00:00 3.00 BOPSUP P INT1 - Test BOPE per BP & AOGCC regs to 250 13500 psi for 5/5
min. Witness of test waived by AOGCC Rep Chuck Scheve.
12/3/2004 00:00 - 01 :00 1.00 BOPSUF P INT1 - RID BOPE test equip't, BID choke & kill lines, pulled test plug
& installed bowl protector.
01 :00 - 04:00 3.00 FISH N HMAN INT1 - PIU & MIU BHA # 10 for pushing junk to bottom consisting of:
85/8"
"metal muncher" bladed mill, boot basket, bit sub, oil jars, XO,
3 61/4" DC's, 2 XO's & 12 jts HWDP.
04:00 - 08:30 4.50 FISH N HMAN INT1 - Thaw out kelly hose.
- B/O kelly hose @ standpipe gooseneck & thaw ice plug wI
steam hose. P/U & MIU kelly hose.
08:30 - 10:30 2.00 FISH N HMAN INT1 - RIH wI clean out assy on 4" DP to 2850' & broke circ.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1213/2004 08:30 - 10:30 2.00 FISH N HMAN INT1 - RIH from 2850' to 3600' & broke circ 3 BPM 500 psi. After
pumping 10 bbls pressure increased to 2000 psi. Bled off &
attempted to pump - pressure increased to 2500 psi. Bled off
: pressure, checked surface system - system clear. Drill string
I plugged off.
10:30 - 12:00 1.50 FISH N HMAN INT1 - Attempted to unplug drill string wlo success. POH to 2800' &
attempted to unplug drill string wlo success.
12:00 - 14:00 2.00 FISH N HMAN INT1 - POH wet wI 4" DP to BHA.
14:00 - 15:00 1.00 FISH N HMAN INT1 - BID BHA & cleaned out plugged mill.
15:00 - 16:00 1.00 FISH N HMAN INT1 - MIU BHA for pushing junk to bottom.
16:00 - 17:30 1.50 FISH N HMAN INT1 - RIH wI clean out assy on 4" DP to 3600' filling @ 2850'.
117:30 - 18:00 0.50 I FISH N HMAN INT1 - CBU @ 3600'.550 GPM 1300 psi.
18:00 - 21 :30 3.50 FISH N HMAN INT1 - RIH from 3600' @ 1.5 min per stand & tag fish w/20K @
5687'. Stack 20K x 3, & 30K x 2 in attempt to move fish. P/U
15' & break circ.
- Stack 20K x 2 on fish wI pumps on - 650 GPM, 2220 psi - no
movement.
- Circulate on top of fish wI no wt on mill for 30 min - 700 GPM,
2630 psi
- P/U & rotate 10, 20, & 60 RPM wI different wts. on mill from 1
to 15K.
Ion junk Tq 2 to 3K higher than off bottom Tq. P/U wt 135K,
,S/O wt 105K, Rot wt 117K.
- WOM 10K, 10 RPM, pump rate 700 GPM, 2630 psi, Tq 5K.
Mill torqued up, fish fell down hole. Worked stand x 2 wI no
drag.
21 :30 - 22:30 1.00 FISH N HMAN INT1 - RIH from 5687' to 6632'.
22:30 - 00:00 1.50 FISH N HMAN INT1 - Tag fish @ 6632' w/20K. PIU & stack 50K on fish x 5 - no
I movement.
I - Circulate on top of fish wI no wt - 700 GPM 2850 psi for 15
min.
- Mill on fish w/5K WOM, 10 RPM, off bottom Tq 4K, on
bottom Tq 7 to 9K, 700 GPM 2850 psi.
- Push fish from 6632' to 6640'.
12/4/2004 00:00 - 01 :00 1.00 FISH N HMAN INT1 - Milled & washed on fish from 6640' to 6880'. WOM 10K, 10
RPM, TQ 7-9K, pump pressure 2160 psi @ 600 GPM.
01 :00 - 03:00 2.00, FISH N HMAN INT1 - At TD stack 50K to 60K wt on fish x 5.600 GPM 2150 psi
- Mill new hole from 6880' to 6885'. WOM 5K to 14K, 100 RPM,
Tq 7 - 8K, 600 GPM 2180 psi.
- Work string from 6885' to 6865' x 10.
03:00 - 05:00 2.00 FISH N HMAN INT1 - Pumped 20 bbllow-vis weighted sweep followed by 20 bbl
hi-vis sweep & CBU x 3.600 GPM 2150 psi 120 RPM.
- Monitored well.
05:00 - 06:00 1.00 FISH N HMAN INT1 - Pump lube pill - pump dry job - BID equip't.
06:00 - 06:30 0.50 FISH N HMAN INT1 - POH from 6885' to 6632'.
- Pulled tight wI 40K overpull.
06:30 - 13:30 7.00 FISH N HMAN INT1 - Attempted to RIH from 6632' wlo success. Stacked 50K on
mill & engaged pumps, 610 GPM 2050 psi. Could not rotate
pipe. Continued to work pipe & obtained rotation wI 20 RPM,
Tq 5 - 20K. Worked string.
- Backreamed out of hole fromm 6632' to 6435' @ 120 RPM,
610 GPM 2000 psi.
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1214/2004 06:30 - 13:30 7.00 I FISH N HMAN INT1 · Hung up @ 6434' . pump rate 610 GPM, 2000 psi. Could not
I rotate. Worked drill string & jarred up wI 50K overpull x 4.
I - Obtained rotation & backreamed out of hole dragging fish
from 6434' to 5477'.
· Lost drag @ 5500', POH from 5479' to 5380' wI no drag.
13:30 . 15:30 2.00 FISH N HMAN INT1 · BID TD.
- POH from 5380' to BHA pulling slowly through 9 5/8" shoe wI
no drag.
15:30 - 17:30 2.00 FISH N HMAN INT1 - POH, clean & B/O BHA.
17:30 - 18:30 1.00 FISH N HMAN INT1 - Clear & clean floor. Loaded new BHA tools & brought to rig
floor.
18:30 . 19:00 0.50 FISH N HMAN INT1 - Service TD.
19:00 . 19:30 0.50 FISH N HMAN INT1 - Loaded additional collars in pipeshed & brought additional
mills to rig floor for current BHA.
19:30 - 21 :30 2.00 FISH N HMAN INT1 - MIU BHA consisting of: 8 1/8" tapered mill, 8 3/8" string mill,
XO, float sub, NM spiral DC, XO, 8 3/8" string mill, XO, NM
spiral DC, 8 1/2" string mill, oil jars, NM spiral DC, XO, 3 DC's,
2 XO's & 12 jts 4" HWDP.
21 :30 - 00:00 2.50 FISH N HMAN INT1 - RIH to 5005'. Filled pipe @ 2800'.
12/5/2004 00:00· 01 :00 1.00 FISH N HMAN INT1 - RIH from 5005' to 5775'. Filled pipe @ 5200'.
· No drag while running in hole wI S/O wt 105K. At 5775' picked
up stand to check drag on upstroke & tagged junk wI 25K
overpull @ 5695'.
.01 :00 - 02:30 1.50 FISH N HMAN INT1 · Backream stand from 5775' to 5679 x 3 - 60 RPM, 600 GPM,
I
2280 psi.
· Increase rotary to 100 RPM & backream stand from 5775' to
5679' x 7. Shut off rotary & pumps & work stand - no drag up or
down.
- Rack back stand & check drag on upstroke from 5679' to
5583', No drag.
- RI H to 5871' - PIU from 5871' to 5775' to check for drag. No
drag
02:30 - 03:30 1.00 FISH N HMAN INT1 - RIH from 5871' to TD @ 6885' wI no problems. Checked for
drag from 6542' to 6446', 6736' to 6639', & from 6885 to 6832'.
03:30 . 05:00 1.50 FISH N HMAN INT1 - Pumped 20 bbllow vis weighted sweep followed by 20 bbl
hi-vis sweep & circulate surface to surface & additional B/U.
05:00 - 06:30 1.50 FISH N HMAN INT1 - Monitor well - POH from 6885' to 5200' wI no drag. Monitor
well - static. Pump dry job & BID TD.
06:30 - 10:00 3.50 FISH N HMAN INT1 - POH wI 4" DP to BHA - no drag.
10:00 - 12:30 2.50 FISH N HMAN INT1 - B/O & UD BHA.
12:30 - 13:00 0.50 FISH N HMAN INT1 - Cleared & cleaned rig floor.
13:00 - 13:30 0.50 BOPSUF N HMAN INT1 - PJSM - drained stack, pulled bowl protector & installed test
plug.
13:30 . 15:00 1.50 BOPSUP N HMAN INT1 - C/O upper rams to 7 5/8".
- Tested door seals to 1 000 psi.
, - Pulled test plug.
15:00 - 15:30 0.50 CASE N HMAN INT1 - PJSM for rigging up & running casing.
15:30 - 17:00 1.50 CASE N HMAN INT1 - R/U 7 5/8" casing handling equip't.
17:00 - 20:00 3.00 CASE P INT1 - MIU & run 33 jts. 7518" 29.7# L-80 STL FJ casing.
- Bakerlok connections on pin end of jts 2 & 3. Broke circulation
& checked floats - floats holding. MIU to 5200 ftllbs Tq and
utilizing Jet Lube Seal Guard thread compound on
Printed: 217/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1215/2004 17:00 - 20:00 3.00 CASE P INT1 connections.
120:00 - 21 :00 1.00 CASE N SFAL INT1 - Dropped casing jts between pit complex & pipeshed. Secure
I area & stand down for safety. Discuss & review incident wI all
I crew members.
21 :00 - 22:30 1.50' CASE N SFAL INT1 - Reposition casing in yard to facilitate loading ODS portion of
pipeshed & load casing.
22:30 - 00:00 1.50 CASE P INT1 - Run 75/8" 29.7# L-80 STL FJ casing to 2112' filling every jt
via Frank's fill up tool.
12/6/2004 00:00 - 01 :30 1.50 I CASE P INT1 - Run 7 5/8" 29.7# L-80 STL FJ casing to 2839' filling every jt
I wI Frank's fill up tool.
I - MIU to 5200 ftllbs Tq. & utilizing Jet Lube Seal Guard thread
compound on connections.
i 01 :30 - 02:00 0.50 CASE P INT1 - CBU x 2 @ 95/8" casing shoe. 4 - 5 BPM wI no losses.
I - 4 BPM 370 psi, 5 BPM 400 psi.
- P/U wt 115K, SIO wt 11 OK.
02:00 - 10:30 8.50 CASE P INT1 - Continue running 75/8" 29.7# STL FJ casing into OH @ 60
sec I jt breaking circulation every 20 jts. Running speed 6 min
per jt while breaking circulation.
- Wash last jt down @ 5 BPM 640 psi.
- Ran a total of 167 jts, 2 19.9' & 2 10' pup jts. RA tags @
6703',6346',6062' & 5940'.
10:30 - 11 :00 0.50 CASE P INT1 - B/O & UD Frank's tool - MIU cement head.
11 :00 - 13:00 2.00 CEMT P INT1 - Staged up pumps - circ & cond mud @ 2 BPM 330 psi, 4
BPM 530 psi & 5 BPM 590 psi.
- Reciprocated 5' while circulating. Took 350K to obtain pipe
movement - P/U wt 225K, SIO wt 127K after initial movement.
- Held PJSM wI Rig Crew, Cementers, Truck Drivers, Mud Eng,
Tool Pusher & Co. Rep while circulating.
13:00 - 15:00 2.00 CEMT P INT1 - Pumped 5 bbls fresh water & tested lines to 4,000 psi.
Pumped 20 bbls CW 100 @ 4 BPM 600 psi followed by 30 bbls
10.2 ppg Mud Push @ 4.5 BPM 650 psi. Dropped bottom plug
& pumped 49 bbls (229 sx) 15.8 ppg Class G cement.
Dropped top plug and pumped 10 bbls fresh water via
Cementers @ 5 BPM 290 psi.
- Switched over to rig pump & displaced wI 301.8 bbls
Seawater at following rates:
Pumped Rate Pressure
50 bbls 5bpm 300 psi
1 00 bbls 5bpm 400 psi
150 bbls 5bpm 450 psi
200 bbls 5bpm 475 psi
250 bbls 5 bpm 550 psi
Slowed Rate to 3 bpm wI 292 bbls pumped. Bumped plug wI
1,900 psi & held pressure for 3 min.
- Bled off pressure & checked floats - floats held.
- CIP 1500 hrs.
15:00 - 16:30 1.50 CEMT P INT1 - RID cement equip't & cleared floor.
- CIO bails & elevators.
16:30 - 17:00 0.50 CASE P INT1 - PJSM - Installed 9 5/8" x 7 5/8" packoff & tested to 5,000 psi
for 10 min. Good test.
17:00 - 19:30 2.50 BOPSUP P INT1 - PJSM - Installed test plug & CIO upper rams from 7 5/8" to 3
1/2" x 6" variables.
- RIU test equip't & tested door seals to 1,000 psi - RID test
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1216/2004 17:00 - 19:30 2.50 BOPSUF P INT1 equip't & pulled test plug.
19:30 - 20:00 0.50 CASE P INT1 . Serviced TD.
20:00 - 21 :00 1.00 DRILL P PROD1 - Load BHA tools on floor.
- MIU 63/4" BHA - 6 3/4" PDC bit, mud motor dialed in to 1.5
deg bend & 6 3/4" stab.
21 :00 - 00:00 3.00 DRILL N ¡DPRB PROD1 . - RIH & tag up @ 27.7' wI PDC bit. POH & inspect bit.
- RIH & tag up @ 27.7' - Apply 5K wt to bit - no go. Apply 5K wt
to bit @ 5 RPM - no go.
- Change setting on motor to 0 deg bend & RIH - no go
- POH & remove bit. RIH wI motor & 65/8" sleeve on motor &
able to RIH to 31' wlo tagging up.
12/7/2004 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 Attempt to RIH wI two different PDC bits & tagged up @ 27.7'.
01 :00 - 02:30 1.50 DRILL P PROD1 PJSM - Line up to OA & test line to 3000 psi. Pumped 50 bbls
mud down annulus @ 1 BPM.
SPM Pressure Total stks
12 630 120
12 610 180
12 660 240
13 720 300
13 720 360
13 710 420
13 700 480
13 700 540
13 700 588
02:30 - 03:00 0.50 DRILL N DPRB PROD1 UD drilling BHA.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 MU 6-3/4" string mill with a stabilizer and a 6-1/4" DC.
04:00 - 04:30 0.50 FISH IN DPRB PROD1 Mill through obstruction @ 27.7'. Milled for - 6" & cleaned up
I area. Ran mill wlo rotatating to 167' to ensure clear below.
04:30 - 05:00 0.50 DRILL IN DPRB PROD1 UD milling BHA.
05:00 - 07:30 2.50 DRILL P PROD1 RU test equipment. Close blind rams and test csg to 3500 psi
for 30 minutes. Bleed pressure, open rams and RD test
equipment.
07:30 - 10:30 3.00 DRILL P PROD1 PU and MU 6-3/4" directional BHA #14
10:30 - 14:30 4.00 DRILL P PROD1 RIH to 2250' with 6-3/4" directional BHA. Shallow test MWD @
685'.
SymOps:
PJSM. RU Little Red to 7-5/8" X 9-5/8" annulus. Test lines to
3000 psi. Inject 45 bbls dead crude to freeze protect.
IPR 2 bpm @ 1500 psi
FPR 2 bpm @ 1500 psi.
Shut in with 950 psi, pressure bled to 250 psi by midnight
14:30 - 16:00 1.50 DRILL P PROD1 Change out saver sub and service top drive.
16:00 - 21 :00 5.00 DRILL P PROD1 Continue RIH from 2250' to 6050' picking up DP from pipe
shed
21 :00 - 22:00 1.00 DRILL P PROD1 Cut and slip 60' of drill line.
22:00 - 22:30 0.50 DRILL P PROD1 Circulate a drill string volume to ensure DP free of obstructions.
22:30 - 23:30 1.00 DRILL P PROD1 RIH from 6050' to 6625'. MU top drive and wash last stand
down down, tagged up on cement stringers @ 6740'
23:30 - 00:00 0.50 DRILL P PROD1 Wash and ream down from 6740' cleaning up cement stringers.
12/8/2004 00:00 - 01 :30 1.50 DRILL P PROD1 Continue washing and reaming down to 6781' cleaning up
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1218/2004 00:00 - 01 :30 1.50 DRILL P PROD1 cement stringers to the float collar.
01 :30 - 02:00 0.50 DRILL P PROD1 PJSM with Veco and all rig personnel on displacing to MOBM.
02:00 - 03:00 1.00 DRILL P PROD1 Pump 20 bbl L VT spacer followed by MOBM to displace well to
9.2 ppg MOBM, 215 gpm @ 1000 psi
03:00 - 05:00 2.00 DRILL P PROD1 Circulate surface to surface X 2 to shear and warm MOBM. 330
gpm @ 2500 psi.
05:00 - 08:00 3.00 DRILL P PROD1 Drill shoe track cement from 6781' to 6870'. Clean out 8-3/4"
rathole from 6870' to 6885' and drill 23' of new hole to 6908'
WOB = 5 klbs
RPM Surf= 50, DH = 225
GPM = 285 @ 2100 psi on Btm
Torque = 3k FtLbs
08:00 - 09:30 1.50 DRILL P PROD1 PJSM. Break off stand and pull bit inside 7-5/8" csg. Perform
10.5 ppg EMW FIT, 411 psi surf pressure at 5265' TVD with
9.0 ppg mud in the hole.
I Baseline ECD = 9.89 ppg
09:30 - 14:00 4.50 DRILL P , PROD1 Directional drill from 6908' to 7197'. sliding as required to
maintain inclination and azimuth.
WOB = 3-5 klbs
i RPM Surf= 80, DH = 260
¡ GPM = 330 @ 2900 psi on Btm, 2570 psi off Btm
P/U 125k S/O 97k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke.
Calculated ECD = 10.09 ppg
Actual ECD = 10.45 ppg
14:00 - 15:00 1.00 DRILL P I PROD1 POH to 7033' and RIH picking up 30' surveys to 7197
15:00 - 00:00 9.00 DRILL P .PROD1 Directional drill from 7197' to 7869', sliding as required to
maintain inclination and azimuth.
WOB = 3-5 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3100 psi on Btm, 2800 psi off Btm
P/U 125k S/O 90k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'
Calculated ECD = 10.10 ppg
Actual ECD = 10.47 ppg
ART last 24 hrs. =2.23 hrs.
AST last 24 hrs. = 4.33 hrs.
Total drilling hours = 6.56 hrs
12/9/2004 00:00 - 00:00 24.00 DRILL P PROD1 Directional drill from 7869' to 9851', sliding as required to
maintain inclination within constraints provided by rig site
geologist to maximize reservoir contact.
Printed; 2/7/2005 9;37;45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/9/2004
00:00 - 00:00
24.00 I DRILL P
PROD1 WOB = 4-7 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3320 psi on Btm, 3120 psi off Btm
Torque = 7k FtLbs on Btm, 6k FtLbs of Btm
P/U 135k S/O 85k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'. Circulate lo-vis and weighted
sweeps as required to ensure clean hole conditions.
Calculated ECD = 10.23 ppg
Actual ECD = 10.47 ppg
12/10/2004 00:00 - 00:00
24.00 DRILL P
ART last 24 hrs. = 5.92 hrs.
AST last 24 hrs. = 2.93 hrs.
Total drilling hours = 8.85 hrs
PROD1 Directional drill from 9851' to 11708', sliding as required to
maintain inclination within constraints provided by rig site
geologist to maximize reservoir contact.
WOB = 4-11 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3550 psi on Btm, 3200 psi off Btm
Torque = 7-8k FtLbs on Btm, 6-7k FtLbs of Btm
P/U 132k S/O 75k ROT 107k
I Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'. Circulate sweeps as required to
ensure clean hole conditions.
Calculated ECD = 10.82 ppg
Actual ECD = 11.02 ppg
12/11/2004 100:00 - 05:00
5.00 DRILL P
ART last 24 hrs. = 3.93 hrs.
AST last 24 hrs. = 4.50 hrs.
Total drilling hours = 8.43 hrs
PROD1 Directional drill from 11708', to TD of lateral #1 at 12190' sliding
as required to maintain inclination within constraints provided
by rig site geologist to maximize reservoir contact.
WOB = 3-6 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3730 psi on Btm, 3240 psi off Btm
Torque = 8k FtLbs on Btm, 7.5k FtLbs of Btm
P/U 144k S/O 70k ROT 109k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.91 ppg
Actual ECD = 11.30 ppg
ART last 24 hrs. = 1 .10 hrs.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/11/2004 00:00 - 05:00 5.00 DRILL P PROD1 AST last 24 hrs. = 0.90 hrs.
Total drilling hours = 2.00 hrs
05:00 - 07:30 2.50 DRILL P PROD1 CBU X 2, to circulate and condition hole.
RPM = 80
1330 gpm @ 3200 psi.
ilntial ECD = 11.25 ppg
Final ECD = 11.10 ppg
Calculated ECD = 10.91 ppg
07:30 - 09:30 2.00 DRILL P PROD1 POH for wiper trip to csg shoe from 12190' to 11703', 35 klbs
drag and swabbing
09:30 - 17:00 7.50 DRILL P PROD1 MU top drive and backream out from 11703' to 6813'.
RPM = 80
GPM = 330 @ 3000 psi
I Torque = 8-10k FtLbs
i 17:00 -18:00 I 1.00 DRILL P PROD1 CBU X 2 at the 7-5/8" csg shoe.
118:00 - 19:00 1.00 DRILL P PROD1 Service top drive, blocks, crown, drawworks and iron
roughneck.
19:00 - 22:00 3.00 DRILL P PROD1 RIH to 12096' filling DP every 20 stands. Work through tight
spots from 11710' to 12096'
22:00 - 23:00 1.00 DRILL P PROD1 MU top drive and wash last stand to bottom at 12190'
23:00 - 00:00 1.00 DRILL P PROD1 Pump a 20 bbllo-vis sweep followed by a 20 bbl weighted
sweep.
RPM = 80
330 gpm @ 3300 psi.
12/12/2004 00:00 - 02:00 2.00 I DRILL P PROD1 Continue circulating BU X 3 to clean and condition hole.
RPM = 80
330 gpm @ 3780 psi.
Intial ECD = 11.45 ppg
Final ECD = 11.19 ppg
Calculated ECD = 11.17 ppg
I SymOps:
I PJSM. Transfer MOBM from pit module to 400 bbl upright
IPROD1 tanks.
02:00 - 02:30 0.50 DRILL P PJSM with MI, Veco and all rig personnel on displacing well to
I SFMOBM.
02:30 - 04:00 1.50 DRILL P PROD1 I Displace well to Solids Free MOBM.
I rate 285 gpm @ 2970 psi
04:00 - 10:30 6.50 DRILL P PROD1 Monitor well - static. POH from 12190' to 6520' to run 4-1/2"
liner. Worked through 7-5/8" csg shoe at 6870'. Recorded PI U
and S I 0 Weights every 1,000'. Circulated bottoms up at csg
shoe, 330 gpm 2,500 psi, RPM 60.
10:30 - 13:30 3.00 DRILL P PROD1 MAD pass from 6520' to 5900' to verify placement of RA tags
in 7-518" csg.
13:30 - 17:00 3.50 DRILL P PROD1 Continue POH from 5951 to 208'. Recorded PI U and S I 0
Weights every 1,000'.
17:00 - 17:30 0.50 DRILL P PROD1 PJSM with Anadrill and all rig personnel on pulling RA sources
and laying down the BHA.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
Spud Date: 12/29/2000
End: 2/3/2005
11/19/2004
2/3/2005
9ES
12/12/2004
17:30 - 20:00 2.50 DRILL P
20:00 - 21 :00 1.00 DRILL P
21 :00 - 21 :30 0.50 CASE P
21 :30 - 22:00 0.50 CASE P
22:00 - 00:00 2.00 CASE P
00:00 - 05:00 5.00 I CASE P
!
05:00 - 06:00 1.00 CASE
06:00 - 07:30 1.50 CASE P
07:30 - 08:00 0.50 I CASE P
08:00 - 12:00 I 4.00. CASE P
12:00 - 13:30 1.50 CASE P
PROD1
PROD1
PROD1
PROD1
12/13/2004
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
I
13:30 - 16:30
16:30 - 17:00 I
17:00 - 17:30
17:30 - 18:30
18:30 - 22:00
22:00 - 00:00
12/14/2004 00:00 - 05:30
05:30 - 06:30
3.00 ¡ CASE P
0.50 CASE P
0.50 CASE P
1.00 CASE P
3.50 STWHIP P
2.00 STWHIP P
5.50 STWHIP P
1.00 I STWHIP P
I
i PROD1
PROD1
PROD1
PROD1
WEXIT
WEXIT
WEXIT
WEXIT
06:30 - 09:00
2.50 STWHI P P
WEXIT
09:00 - 15:00
6.00 STWHIP P
WEXIT
LD BHA #14, Clear floor and remove RA sources.
I Clean and clear rig floor.
, Rig up to run 4-1/2" liner
PJSM with Baker and all rig personnel on picking up and
running 4-1/2", 12.6#, IBT-M, L-80 liner.
PU and RUN 4-1/2", 12.6#, L-80, IBT-M slotted liner.
Continue PU and RUN 4-1/2", 12.6#, L-80, IBT-M slotted liner.
Ran 127 jts slotted liner, 10 jts solid liner, average MU torque
2200 FtLbs. A free floating 5-3/4" centralizer was run on each
joint, except the shoe joint.
MU seal bore extension, ZXP liner top packer and liner hanger
with liner running tool. RD 4-1/2" tbg equipment.
RIH with 4-1/2" liner on DP to 7-5/8" csg shoe @ 6870.
Circulate 1-1/2 X the string volume. 6 bpm @ 880 psi
Continue RIH with 4-1/2" liner on DP, break circulation every 15
'stands. Record P/U and SIO weights every 500'.
I MU top drive and break circulation. Drop setting ball. RIH and
tag up at 12190'. PU and space out liner top at 6446, shoe at
12184'. Stage up pump and pump ball on seat, 2 bpm @ 270
psi. Increase pressure to 2000 psi to set liner hanger, stack
20k Ibs on liner to verify hanger set. Increase pressure to 4000
psi to set ZXP packer. Bled down pressure and closed annular,
tested packer to 1500 psi for 5 minutes.
Monitor well - static. POH with 4" DP.
Break out and LD liner running tool.
Clean and clear rig floor.
Service top drive, blocks and iron roughneck.
MU whipstock assembly. PU and Orient MWD.
PU 12 jts of 4-3/4" DC's and 24 jts of 4" HWDP.
RIH wI Whipstock Assembly on 4" DP to 6,399'.
MU top drive and orient whipstock. RIH and set whipstock
anchor and dummy seal assembly at 6,457'. Whipstock slide
oriented 14 deg left of highside. Set down whipstock trip anchor
wI 20,000# slackoff, stacked addtionaI10,000# on anchor to
ensure set. PU w/1 0,000# overpull to check anchor set.
Stacked 40,000# on mill and sheared free from whipstock. PU
to neutral weight and rotated drill string to ensure mills sheared
free from whipstock slide. Top of whipstock at 6,397'.
Held PJSM. Displaced well bore from SFMOBM to MOBM.
Pump rate 3 bpm @ 1,200 psi. Total displacement 240 bbls.
Took returns of SFMOBM back to pit #3 and hauled to MI plant
for reconditioning. Circulated mud system one full surface to
surface to condition mud.
Mill window from 6397' to 6409'. Continue milling and dressing
window to 6423'.
WOM = 5 klbs
RPM = 100-110
GPM = 285 @ 1910 psi
Torque = 5-8k FtLbs
P/U 120k S/O 11 Ok ROT 105k
100 Ibs of metal recovered
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12114/2004 15:00 - 16:30 1.50 STWHIP P WEXIT Circulate 35 bbl hi-vis sweep around to clean metal from hole.
16:30 - 18:30 2.00 STWHIP P WEXIT Monitor well - static. Slug DP and POH with milling assembly.
18:30 - 20:30 2.00 STWHIP P WEXIT Stand back HWDP and DC's. LD milling BHA.
20:30 - 22:00 1.50 BOPSUP P WEXIT Flush and drain BOP stack. Pull wear bushing and install test
plug
22:00 - 22:30 0.50 BOPSUP P WEXIT RU BOP test equipment fill stack with water.
22:30 - 00:00 1.50 BOPSUP P WEXIT Test BOPE to 3500 psi 1250 psi, test annular to 2500 psi 1250
psi for 5 minutes each. Witness of BOP test waived by John
Spaulding with AOGCC.
12/15/2004 00:00 - 04:00 4.00 BOPSUP P WEXIT Continue testing BOPE to 3500 psi I 250 psi, test annular to
3500 psi I 250 psi for 5 minutes each. Witness of BOP test
IWEXIT waived by John Spaulding with AOGCC.
04:00 - 04:30 0.50 BOPSUPP RD test equipment, pull test plug. Drain water from stack to
cuttings box. Install wear bushing
04:30 - 05:00 0.50 STWHIP P WEXIT PJSM with Anadrill and all rig personnel on Picking up and
loading RA sources in BHA.
05:00 - 09:00 4.00 STWHIP P WEXIT 'PU and MU 6-3/4" directional BHA with Hycalog DS146X. Load
RA sources and RIH.
09:00 - 13:00 4.00 STWHI P P WEXIT RIH with BHA #16 on DP. MU top drive and shallow test MWD
at 1000'. Break circ every 20 stands on trip in.
13:00 - 14:30 1.50 STCTPL P WEXIT Log down across 2 RA markers and confirm depths at 5933'
and 6055' MD DP measurement - OK. Obtain benchmark ECD
readings with PWD at 10.08 ppg @ 325 gpm and validate ECD
model.
14:30 - 15:30 1.00 STWHI P P WEXIT . Cut drilling line.
15:30 - 16:00 0.50 STWHIP P WEXIT MU top drive, orient tool 14 degrees right and RIH passing
through window at 6397' without difficulty. Stage up pump and
wash down to TD at 6423'.
16:00 - 00:00 8.00 DRILL P PROD2 Directional drill from 6423', to 6906' as per directional plan.
WOB = 5-8 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2820 psi on Btm, 2440 psi off Btm
Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm
PIU 120k S/O 95k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.10 ppg
Actual ECD = 10.23 ppg
ART last 24 hrs. = 1.48 hrs.
AST last 24 hrs. = 1.63 hrs.
Total drilling hours = 3.11 hrs
12/16/2004 00:00 - 00:30 0.50 DRILL P PROD2 Directional drill from 6906', to 7003' as per plan.
WOB = 5-10 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm
Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm
P/U 120k S/O 95k ROT 11 Ok
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12116/2004 P Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
I Calculated ECD = 10.13 ppg
I Actual ECD = 10.40 ppg
00:30 - 01 :30 1.00 DRILL N RREP PROD2 Repair top drive upper kelly valve actuator.
01 :30 - 07:00 5.50 DRILL P PROD2 Directional drill from 7003', to 7292' as per directional plan.
WOB = 4-7 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2550 psi on Btm, 2410 psi off Btm
Torque = 5-6k FtLbs on Btm, 5k FtLbs off Btm
P/U 120k S/O 95k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'. Crossed fault at 6895' MD.
Calculated ECD = 10.19 ppg
Actual ECD = 10.20 ppg
07:00 - 09:00 2.00 DRILL N DPRB PROD2 Saw sudden increase in pump pressure of -700 psi and ECD
jump to 10.45 ppg shortly after making a connection. Suspect
cuttings avalanching uphole (in casing). Drilling in OBc shale
from 7050' MD. Backream out from 7292 - 7090' to clean up
hole. Getting back abundant amount of shale cuttings approx
1/8" - 1/4" cubes (angular). Continue slow backreaming until
hole cleaned up and pressure & ECD returned to normal. No
mud losses noted.
09:00 - 09:30 0.50 DRILL N DPRB PROD2 RIH to bottom - no problems.
09:30 - 13:00 3.50 DRILL P PROD2 Directional drill from 7292', to 7420' as per plan.
WOB = 5-10 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm
Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm
I P/U 120k S/O 95k ROT 11 Ok
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.13 ppg
Actual ECD = 10.40 ppg
13:00 - 15:00 2.00 DRILL N DFAL PROD2 Cuirculate while attempting to reestablish communication with
MWD/LWD tools.
15:00 - 16:30 1.50 DRILL N DFAL PROD2 Backream from 7420' to 7100' to clean hole prior to trip for
MWD.
16:30 - 18:00 1.50 DRILL P PROD2 Communication with MWD/LWD re-established. Circulate hole
clean and RIH to bottom at 7420'.
18:00 - 23:00 5.00 DRILL P PROD2 Directional drill from 7420', to 7920' as per plan.
WOB = 5-9 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3010 psi on Btm, 2860 psi off Btm
Torque = 6k FtLbs on Btm, 5k FtLbs off Btm
Printed: 217/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12116/2004 18:00 - 23:00 5.00 DRILL P PROD2 P/U 120k SIO 93k ROT 1 05k
I
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.29 ppg
1.001 DRILL Actual ECD = 10.31 ppg
23:00 - 00:00 P PROD2 Saw pressure and ECD increase with corresponding increase
I in 1/8" to 1/4" angular to blocky cutting sized shale pieces
I Ip across shaker. Circulated weighted sweep surface to surface.
12/17/2004 00:00 - 00:30 0.50' DRILL PROD2 Continue to circulate weighted sweep out of hole. Sweep
brought an increase in cuttings volume across shaker, mostly
11/4" to 118" angular to blocky shale and some fine sands.
00:30 - 02:30 2.00 DRILL P PROD2 I Directional drill from 7920' to 8059' sliding as required to build
I into the OBb as per plan.
I
I
¡WOB = 9-10 klbs
i RPM Surf= 80, DH = 260
!GPM = 330 @ 3140 psi on Btm, 3040 psi off Btm
I
IT orque = 5k FtLbs off Btm
PIU 123k SIO 93k ROT 105k
Backream each stand at drilling rate, reducing pump rate on
I down stroke. Survey every 30'.
I Added 1 drum of HRP to mud system to increase VP and gel
strength.
Calculated ECD = 10.31 ppg
Actual ECD = 10.71 ppg
02:30 - 03:30 1.00 DRILL P PROD2 Circulate for ECD management, circulating HPR through
system.
03:30 - 07:00 3.501 DRILL P I PROD2 Directional drill from 8059' to 8347' sliding as required to
I maintain OBb contact as per plan.
WOB = 6-7 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3200 psi on Btm, 2970 psi off Btm
Torque = 5.5k FtLbs on Btm, 5k FtLbs off Btm
P/U 122k S/O 93k ROT 1 06k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.30 ppg
Actual ECD = 10.78 ppg
07:00 - 07:30 0.50 DRILL P PROD2 Circulate for ECD management.
07:30 - 12:00 4.50 DRILL P PROD2 ,Continue drilling ahead to 8636' MD. Switched from #2 to #1
mud pump. MWD quit working shortly after switching pumps.
12:00 - 13:30 1.50 DRILL P PROD2 Circ and pump out of hole 5 stands to try and clear MWD - OK.
RIH to bottom.
13:30 - 00:00 10.50 DRILL P PROD2 Directional drill from 8636' to 9400' sliding as required to
maintain OBb contact as per plan.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12117/2004 13:30 - 00:00 10.50 DRILL P PROD2
WOB = 6-8 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3400 psi on Btm, 3100 psi off Btm
Torque = 8k FtLbs on Btm, 6k FtLbs off Btm
P/U 125k S/O 80k ROT 100k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.76 ppg
Actual ECD= 11.11 ppg
ART last 24 hrs. = 2.88 hrs.
, AST last 24 hrs. = 4.19 hrs.
Total drilling hours = 7.07 hrs
12/18/2004 00:00 - 08:00 8.00 DRILL P PROD2 Directional drill from 9400' to 10143' sliding as required to
maintain OBb contact as per plan.
WOB = 3-4 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3750 psi on Btm, 3440 psi off Btm
Torque = 6-7k FtLbs on Btm, 6k FtLbs off Btm
PIU 135k SIO 80k ROT 115k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'. Circulate 15bbllo-vis sweep
around at 9906'. Slide one full stand to get top drive down to rig
floor for troubleshooting.
¡Calculated ECD = 10.76 ppg
I PROD2 Actual ECD = 11.18 ppg
08:00 - 11 :00 3.00 DRILL N RREP After making a slide and connection, top drive would not rotate
I or back out of connection. Check out top drive - nothing
conclusive seen but possibly a bad encoder that controls TD
rotation.
11 :00 - 14:30 3.50 DRILL N RREP PROD2 Get TD connection broken and back out with rotary table. POH
to window for top drive repairs - also need to replace blower fan
for motors in TD that failed previously.
, POH to window - no pumping or backreaming possible.
Work thru tight spots at 9617',9554-44',9420',9340',9175',
9150-40'. Overpulls to 25 klbs.
14:30 - 21 :30 7.00 DRILL N RREP PROD2 Repair top drive. Replace encoder and purge moisture from
upper kelly valve airlines. Blow moter has failed, no spare on
Slope but will be able to drill ahead unit! new motor is available.
21 :30 - 22:30 1.00 DRILL N RREP PROD2 RIH to 7956'
22:30 - 23:30 1.00 DRILL N RREP PROD2 MU top drive, stage up pumps and break circulation. TD made
up on connection erratically.
Top drive saver sub threads have been stripped from pin when
making up the stand. Appears to be caused by improper
hook-up of new encoder that caused the connection to
overtorque.
23:30 - 00:00 0.50 DRILL N RREP PROD2 LD damaged joint of 4" DP. POH to window to change top drive
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12/18/2004 23:30 - 00:00 0.50 DRILL N RREP PROD2 saver sub.
12/19/2004 00:00 - 01 :00 1.00 DRILL N RREP PROD2 Continue POH to change out top drive saver sub.
01 :00 - 02:30 1.50 DRILL N RREP PROD2 Change out top drive saver sub.
02:30 - 04:30 2.00 DRILL N RREP I PROD2 ¡ RIH to 10132', make up top drive and break circulation at
18246'.
04:30 - 05:00 0.50 DRILL N RREP PROD2 I Wash last stand to bottom at 10143'
05:00 - 00:00 19.00 DRILL P PROD2 Directional drill from 10143' to 11656', sliding as required to
maintain OBb contact as per plan.
WOB = 4-5 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3750 psi on Btm, 3440 psi off Btm
Torque = 6-7k FtLbs on Btm, 6k FtLbs off Btm
PIU 135k S/O 80k ROT 113k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
Calculated ECD = 10.76 ppg
Actual ECD = 11.18 ppg
ART last 24 hrs. = 3.25 hrs.
I AST last 24 hrs. = 5.26 hrs.
¡Total drilling hours = 8.51 hrs
12/20/2004 00:00 - 05:30 5.50 DRILL P PROD2 I Directional drill from 11656' to 12160', sliding as required to
maintain OBb contact as per plan.
WOB = 4-5 klbs
RPM Surf= 80, DH = 260
GPM = 330 @ 3640 psi on Btm, 3410 psi off Btm
Torque = 7-8k FtLbs on Btm, 7k FtLbs off Btm
P/U 147k SIO 65k ROT 120k
Backream each stand at drilling rate, reducing pump rate on
down stroke. Survey every 30'.
1.50 I DRILL Calculated ECD = 10.85 ppg
Actual ECD = 11.02 ppg
05:30 - 07:00 P PROD2 Circulate a 20 bbllo-vis sweep followed by a 20 bbl weighted
sweep surface to surface.
RPM = 80
330 gpm @ 3300 psi.
07:00 - 14:00 I 7.00 DRILL P PROD2 MU top drive and backream from 12160' to 10050'. Stands 2 &
3 took significant amount of backreaming - pressure increases
but no real increase in ECD as if reaming undergauge hole
rather than moving cuttings beds.
Continue backreaming - became much better above 11300'.
RPM = 95
GPM = 330 @ 3000 psi
Torque = 8-10k FtLbs
14:00 - 15:00 1.001 DRILL P PROD2 CBU at 10050' - 330 gpm & 95 rpm. Circ until shakers cleaned
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12120/2004 14:00 - 15:00 1.00 DRILL P PROD2 up. Pull 3 stds dry - no problems, hole clean.
15:00 - 17:00 2.00 DRILL P PROD2 RIH to bottom.
117:00 - 22:00 5.00 DRILL P PROD2 Circulate BU X 3 to clean and condition hole.
!
RPM = 95
330 gpm @ 3350 psi.
Intial ECD = 10.50 ppg
Final ECD = 10.26 ppg
Calculated ECD = 10.86 ppg
SymOps:
PJSM. Transfer MOBM from pit module to 400 bbl upright
tanks.
22:00 - 22:30 0.50 DRILL P . PROD2 PJSM with MI, Veco and all rig personnel on displacing well to
I SFMOBM.
22:30 - 00:00 1.50 DRILL P PROD2 I Displace well to Solids Free MOBM.
I rate 145 gpm @ 1560 psi
12/21/2004 00:00 - 01 :00 1.00 DRILL P I PROD2 Continue displacing well to Solids Free MOBM.
rate 145 gpm @ 1560 psi
01 :00 - 01 :30 0.50 DRILL P PROD2 Monitor well - static. Take slow pump rates. Blow down top
drive.
01 :30 - 05:00 3.50 DRILL P PROD2 POH from 12160 to the window at 6397'. No problems or tight
spots
05:00 - 06:00 1.00 DRILL P PROD2 Service top drive, blocks, crown and drawworks. Change oil in
top drive.
06:00 - 07:00 1.00 DRILL N RREP PROD2 Finish changing oil in top drive.
07:00 - 10:00 3.00 DRILL P PROD2 I POH to BHA
10:00 - 12:30 2.50 DRILL P PROD2 I PJSM. Handle BHA. Remove nuclear source. LD LWD, MWD,
motor & bit DSX146H (RR3).
12:30 - 13:00 0.50 DRILL P PROD2 Clear & clean rig floor.
13:00 - 13:45 0.75 CASE P PROD2 RU to run 4.5" slotted liner.
13:45 - 14:00 0.25 CASE P PROD2 PJSM for running liner.
14:00 - 20:00 I 6.00 CASE P PROD2 Run 4.5" IBT-M slotted liner in OBb lateral per running order.
MU 4 jts solid liner, swell packer, 5 jts slotted liner and
aluminium billet liner top.
Depth in P/U wt S/O wt
1040' 49K 50K
2082' 58K 62K
3115' 70K 72K
4155' 81K 79K
4580' 85K 80K
20:00 - 00:00 4.00 CASE P PROD2 Run 4 1/2" slotted liner in OBb lateral on 4" DP.
Depth in PIU wt SIO wt
5553' 97K 90K
6510' 109K 94K
7470' 115K 92K
8430' 122K 91K
12/22/2004 00:00 - 02:30 2.50 I CASE P PROD2 - RIH w/4 1/2" slotted liner on 4" DP to TD @ 12160'.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
Spud Date: 12/29/2000
End: 2/3/2005
11/1 9/2004
2/3/2005
9ES
Depth in P/U wt S/O wt
9387' 130K 82K
9674' 137K 85K
9950' 140K 87K
, 10230' 147K 93K
110415' 154K 92K
10605' 149K 93K
11 080' 160K 87K
11560' 167K 83K
12035' 167K 80K
12160' 172K 81K
PROD2 - Tag bottom @ 12160' w/5K. P/U off bottom to break over pt
@ 172K & tag bottom w/10K. Establish circulation @ 100
GPM 960 psi & pick up string. Up wt 135K - shut down pump &
continue picking up string.
, String wt indicates off of liner.
- POH wI 4" DP & UD aluminum billet running spear.
- Clear & clean rig floor.
- PJSM for P/U BHA.
- PIU & M/U BHA - 6 3/4" DSX 146 PDC bit, XP motor w/1.5
deg bend, bypass sub, NM stab, NM flex lead collar, MWD,
PWD, ADN, 2 NM flex DC's, XO, & jars.
- RIH from 209' to 6376' filling every 25 stands.
- Shallow test MWD @ 1165' - 330 GPM, 1700 psi.
- PJSM - slip & cut drilling line.
- PJSM - R/U & transfer MOBM from upright tanks & displace
well from solids free MOBM to MOBM. 330 GPM, 2350 psi, 75
RPM & reciprocating.
- Establish clean hole ECD's at 6376' as follows:
1'- RIH to 6526' - Wash from 6526' to top of billet@7581'DPM.
70 GPM 300 psi 20 RPM.
1- Trench from 7574' to 7581' @ 330 GPM 2800 psi.
1- Time drill @ 2 FPH for 2' & 4 FPH for 4' to sidetrack off of
'billet @ 330 GPM 2800 psi.
- Fine granules of aluminum seen @ shakers on B/U.
- Time drill @ 4 FPH for 4' & 12 FPH for 10'. Sidetrack off of
aluminum billet successful. PU above billet and make a pass
by the billet - pumps on. OK.
- 100% slide @ 330 GPM 2820 psi
PROD3 - Drill directionally in 6 3/4" hole from 7601' to 8250'
backreaming each stand at full drilling rate & reducing pump
rate to 75% on downstroke.
02:30 - 03:00
0.50 CASE P
03:00 - 07:00 4.00 CASE P , PROD2
07:00 - 07:30 I 0.50 CASE P i PROD2
07:30 - 08:00 I 0.50 STKOH P ¡WEXIT
08:00 - 10:30 2.50 STKOH P ,WEXIT
10:30 - 14:00 3.50 STKOH P WEXIT
14:00 - 15:00 1.00 STKOH P WEXIT
15:00 - 18:00 3.00 STKOH P WEXIT
18:00 - 20:00 2.00 STKOH P WEXIT
20:00 - 22:00 2.00 STKOH P WEXIT
22:00 - 00:00 2.00 STKOH P WEXIT
12/23/2004 00:00 - 02:00 2.00 DRILL P PROD3
02:00 - 12:00
10.00 DRILL P
GPM
280
280
330
330
RPM
o
60
o
60
Pump Pressure
1655
1655
2350
2350
ECD
9.84
9.92
10.02
10.05
- WOB 6K, 330 GPM, PP off bottom 2850 psi, on bottom 3150
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
8-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11 /1 9/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12123/2004 02:00 - 12:00 10.00, DRILL P PROD3 psi, 80 RPM, Tq on bottom 7K, Tq off bottom 6K.
- PIU wt 125K, SIO wt 93K, Rot wt 105K.
- Calculated ECD 10.36, actual ECD 10.63.
AST 2.98 hrs, ART 1.18 hrs, ADT 4.16 hrs.
12:00 - 00:00 12.00 DRILL P PROD3 1- Drill directionally in 6 3/4" hole from 8250' to 9493'
I backreaming each stand at full drilling rate & reducing pump
I rate to 75% on downstroke.
- WOB 5-8K, 330 GPM, PP off bottom 2830 psi, on bottom
3250 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K.
- P/U wt 130K, S/O wt 75K, Rot wt 107K.
- Calculated ECD 10.65, actual ECD 11.0.
- AST 2.43 hrs, ART 2.72 hrs, ADT 5.15 hrs.
12/24/2004 00:00 - 12:00 12.001 DRILL P PROD3 - Drill directionally in 63/4" hole from 9493' to 10526'
backreaming each stand at full drilling rate and reducing pump
I rate to 75% on downstroke.
- WOB 5-8K, 330 GPM, PP off bottom 3200 psi, on bottom
3500 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K.
- PIU wt 145K, SIO wt 77K, Rot wt 115K.
- Calculated ECD 10.79, actual ECD 10.96.
- AST 2.69 hrs, ART 2.36 hrs, ADT 5.05 hrs.
12:00 - 00:00 12.00 DRILL P PROD3 - Drill directionally in 6 3/4" hole from 10526' to 11437'
backreaming each stand at full drilling rate and reducing pump
rate to 75% on downstroke.
-WOB 5-8K, 330 GPM, PP off bottom 3250 psi, on bottom
3600 psi, 80 RPM, Tq on bottom 9K, Tq off bottom 8K.
- PIU wt 154K, SIO wt 65K, Rot wt 115K.
- Calculated ECD 10.49, actual ECD 10.76.
- AST 2.43 hrs, ART 2.85 hrs, ADT 5.28 hrs.
12/25/2004 00:00 - 06:30 6.50 DRILL P PROD3 - Drill directional in 63/4" hole from 11437' to TD @ 12043'
MD. Backream each stand at full drilling rate & reduce pump
rate to 75% on downstroke.
- WOB 5-8K, PP off bottom 3260 psi, on bottom 3700 psi, 80
RPM,
Tq on bottom 10K, off bottom 9K.
- PIU wt 165K, SIO wt 60K, Rot wt 115K.
- Calculated ECD 10.71, actual ECD 10.89
- AST 1.12 hrs, ART 2.07 hrs, ADT 3.19 hrs.
06:30 - 10:00 3.50 DRILL P PROD3 - Circ lo-vis sweep surface to surface. Circ until actual ECD
was 10.78 vs 10.74 calculated.
10:00 - 10:30 0.50 DRILL P PROD3 - Monitor well while blowing down TD.
10:30 - 17:30 7.00 DRILL P PROD3 - POH for check trip to window. Hole condition v. good - no
pump or backreaming required.
- Pump out past billet and saw 10k overpulls - stabilizer on
ADN. Nothing when bit went across billet. Orient 120L and stop
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
12125/2004 10:30 - 17:30 7.00 DRILL P PROD3 pump. Run in below billet and back up above - no obstructions,
no overpulls.
- Continue POH to window.
17:30 - 19:00 1.50 DRILL P PROD3 - RIH to 50' above billet - MIU TD & orient 90L. RIH wlo pump
& tag billet @ 7581' w/5K. P/U above billet, turn on pump, & in
, 30L setting. Orient 120L & RI H past billet wI no problem.
19:00 - 21 :30 2.50 DRILL P PROD3 - RIH to TD @ 12043' - hole slick.
21 :30 - 23:00 1.50 DRILL P PROD3 - Pump lo-vis weighted sweep & circ surface to surface @ 330
GPM 3700 psi, 90 RPM & reciprocating.
- Calculated ECD 10.76, actual ECD 10.8 to 10.85.
1- Prepare for displacement by reducing surface volume. Pump
'100 bbls MOBM into tank farm. Take on SFMOBM into pit 3.
23:00 - 00:00 1.00 DRILL P PROD3 - Displace MOBM wI SFMOBM @ 285 GPM 2650 psi, 90 RPM
& reciprocating.
12/26/2004 00:00 - 01:15 1.25 DRILL P PROD3 - Displace MOBM wI SFMOBM @ 285 GPM 2650 psi, 90 RPM,
, & reciprocating.
01:15 - 01:30 0.25 DRILL P PROD3 1- BID TD - monitor well - static.
01 :30 - 05:30 4.00 DRILL P PROD3 ,- POH to 6000' - hole in excellent shape wI maximum 5K drag.
No sign of billet while pulling by wI ADN stab or bit.
05:30 - 06:30 1.00 DRILL P PROD3 - Service TD.
I - Monitor well.
06:30 - 11 :30 5.00 DRILL P PROD3 - POH to 684'.
, 11 :30 - 19:00 7.50 DRILL N WAIT PROD3 ,- Stab TIW valve in string - monitor well wI hole fill pump on
while waiting for weather to improve. Phase 3 conditions.
i - 6.5 bblloss for 7.5 hrs.
19:00 - 19:30 0.50 DRILL P 1 PROD3 - PJSM for handling BHA & source - POH to BHA.
19:30 - 21 :30 2.00 DRILL P PROD3 - UD BHA.
21 :30 - 22:00 0.50 CASE P PROD3 - Clear & clean floor.
22:00 - 22:30 0.50 CASE P PROD3 - Service TD & drawworks.
22:30 - 00:00 1.50 FISH P PROD3 - MIU Whipstock retrieving BHA as follows: Fixed lug retrieval
hook, 1 jt 3 1/2" HWDP, bumper sub, oil jars, float sub, MWD,
&XO.
12/27/2004 00:00 - 00:30 0.50 STWHIPI P PROD3 - Continue MIU whipstock retrieving BHA.
00:30 - 02:00 1.50 STWHIP P PROD3 ,- RIH w/8 stands HWDP.
1- Shallow test MWD & BID TD.
02:00 - 03:30 1.50 STWHIP P PROD3 - RIH wI whipstock retrieval ass'y on 4" DP to 4178'.
03:30 - 04:00 0.50, STWHIP P PROD3 - CBU to condition mud @ 285 GPM 1180 psi.
- BID TO.
04:00 - 06:00 2.00 STWHIP P PROD3 - RIH wI 4" DP to -30' above whipstock. Fill pipe & orient hook
wI MWD.
- P/U wt 130K, SIO wt 105K.
- RIH to 5' below top of whipstock @ 6402'. Engage slot in
whipstock face - OK. PIU & release whipstock wI 65K over.
- Monitor well.
06:00 - 07:00 1.00 STWHIP P PROD3 - CBU @ 250 GPM 1100 psi.
07:00 - 12:00 5.00 STWHIP P PROD3 - POH wI 4" DP to BHA.
12:00 - 14:00 2.00 STWHIP P PROD3 - UD BHA.
- Clear floor of tools & clean floor.
14:00 - 15:00 1.00 CASE P PROD3 - PJSM - RIU 4 1/2" liner running equip't.
15:00 - 19:00 4.00 CASE P PROD3 Run 4.5" slotted liner to 2484'.
19:00 - 20:00 1.00 CASE N RREP PROD3 Replace casing tongs.
20:00 - 22:30 2.50 CASE P PROD3 Continue running 4.5" slotted liner.
22:30 - 23:30 1.00 CASE N RREP PROD3 Replace cable on laydown machine.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/1 9/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12127/2004 23:30 . 00:00 0.50 CASE P PROD3 Continue running 4.5" slotted liner to 4000'.
12/28/2004 100:00 - 03:30 3.50 CASE P PROD3 - RI H wI 4 1/2" guide shoe jt, 116 jts 4 1/2" slotted liner & 16 jts
4 1/2" solid liner.
- Avg M/U tq 3500 ftllbs.
03:30 - 04:00 0.50 CASE P PROD3 - CIO to 3 1/2" elevators.
- PIU & MIU hook hanger. Total length of liner, hook hanger, &
associated pup jts 5627.99'.
· UD tubing tongs.
04:00 - 11 :30 7.50 CASE P PROD3 - RIH w/4 1/2" liner on 4" DP to 11921'.
- Worked through window on 2nd attempt after picking up
Ip above it & rotating string 1/2 turn.
- Did not see aluminum billet @ 7581'.
, 11 :30 - 18:30 7.00 CASE PROD3 - Attempt to hook hanger on window wlo success. Able to run
hook 10' below window, but unable to get beyond 12017'. (TD
@ 12043')
18:30 - 00:00 5.50 CASE N DFAL PROD3 - Monitor well.
- POH to 7255' wI 4" DP slowly (3-4 min per stand) to prevent
swabbing due to swell packers.
00:00 - 01 :00 I - Strapping DP while POH.
12/29/2004 1.00 CASE N DFAL PROD3 - POH wI 4" DP to hook hanger.
- 1.84' difference in tally & SLM.
01 :00 - 03:30 2.50 CASE N DFAL PROD3 - CIO elevators & P/U hook hanger & inspect. No damage to
hook or hanger.
· R/U casing tongs & UD hook hanger & ball catcher assy.
- UD 1 jt 4 1/2" slotted liner.
- M/U hook hanger & ball catcher assy.
- UD casing tongs.
03:30 - 11 :00 7.50 CASE N DFAL PROD3 · RIH wI hook hanger on 4" DP to 7013'
- Tag up on liner tie back @ 6465" - PIU above TOW & rotate
string 1/2 turn. Made it through window on 2nd attempt.
! - RIH to 11,900'
111 :00 - 14:00 I N DFAL PROD3 - String Wt. down 75-50k, up 170k
3.00 I CASE - Attempted to set hook wlo success. Able to work hook 10'
outside window, could not get below 11,976'. Decided to POOH
and dress window.
14:00 - 20:30 6.50 CASE N DFAL PROD3 - POH with 4" DP to hanger.
20:30 - 21 :30 1.00 CASE N DFAL PROD3 - Change elevators 3 1/2"
- UD hanger
- Change elevators to 4 1/2"
121 :30 - 00:00 2.50 CASE N DFAL PROD3 - PJSM - discussed risks associated with laying down liner
· POH UD 16 jts 41/2" solid liner, 8 jts 41/2" slotted liner 1 x 1.
I - UD 2 swell packers. Original OD 6.4" - currently 6.53"
12/30/2004 00:00 - 07:30 7.50 CASE N DFAL PROD3 - POOH w/4 1/2" slotted liner.
- Total jts. UD, 115 slotted,16 solid, 1 shoe jt, 2 swell packers
and 1 hook hanger.
07:30 - 08:30 1.00 CASE N DFAL PROD3 - Monitor well
- RID TBG equipment
- Clearlclean rig floor
08:30 - 09:00 0.50 BOPSUF P PROD3 - PJSM
- Pulled wear bushing
- Set test plug
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12130/2004 08:30 - 09:00 0.50 BOPSUF P PROD3
09:00 - 13:30 4.50 BOPSUF P PROD3
I
13:30 - 14:30 1.00 BOPSUP P PROD3
14:30 - 15:00 0.50 CASE N DFAL PROD3
15:00 - 17:30 2.50 CASE N DFAL PROD3
17:30 - 20:00 2.50 CASE N DFAL PROD3
20:00 - 23:00 3.00 CASE N DFAL PROD3
23:00 - 00:00 1.00· CASE N DFAL PROD3
12/31/2004 00:00 - 05:00
05:00 - 07:00
07:00 - 11 :00
11 :00 - 12:00
12:00 - 12:30
12:30 - 13:30
13:30 - 17:00
17:00 - 21 :00
5.00 CASE N
- R/U test equipment
- Test BOPE's
- 3,500 psi. highl 250 psi. lowl 5 min.
- Witness of test wavied by John Chrisp (AOGCC)
- Pull test pi ug
- Install wear bushing
- Blow dn. test lines
- RID test equipment
- Cut apart bent shoe jt. & slotted jt. wI Wachs cutter
- Clean out under rotary table (dried excess drilling fluid)
- CIO air boot
! - PJSM
- Build window polish mill assy. (2 ea. string mills @ 63/4" OD)
- Test MWD before proceeding in hole
- RIH wI 4" DP to 6300' (63 stds DP)
- Fill DP every 2000'
- Orient bent jt. I MWD to 15 deg. left of HS and RIH to 6388'
- P/U std # 64 & reorient and attempt to slide out window (TOW
@ 6397' & BOW @ 6409'). Bottomed out in tie back sleeve @
6461 '. No success after repeated attempts.
DFAL PROD3 - Attempt to exit window wI polish mill assy. (circ. & non-circ.)
- Position/orient string @ 90 deg. increments & attempt exit
- Rotate @ 6393' @ 10 rpm w/steady 3500 ftllbs torque.
Repeat @
6405' (middle of window) with same results.
- Rotate fl 6390' to 6420' @ 5 rpm wI 3000 ftllbs steady
torque, (rotary limit set @ 3500 ftllbs.). Attempting to stall
drill string @ window. No success
- Positionlorient string @ 45 deg. increments & attempt exit
- POH to 6358' (UD 1 jt.), orient to 9 deg. left of HS. RIH &
P/U 1 jt. and bottom out in tie-back sleeve @ 6461 '.
- Same as above but @ 14 deg. left of HS, no success.
I
2.00 CASE N
4.00 CASE N
1.00 CASE N
0.50 I CASE N
1.00 CASE N
3.50 CASE N
4.00 CASE N
DFAL PROD3
DFAL PROD3
DFAL PROD3
DFAL PROD3
DFAL PROD3
DFAL PROD3
DFAL PROD3
- PJSM
. - Slip & cut drilling line.
- POH w/4" DP
- Pooh w/BHA, B/O & UD same
- Clear & clean rig floor
- PJSM
- Strap and MIU BHA
- RIH wI polish mill assy. #2 on 4" Dp to 6310'
- String Wt. Up 130K, Dn 100K
- Orient bent jt. wI MWD
- Pump Rate 80 spm @ 1340 psi.
- During orienting process tagged btm of window @ 6409'.
Unable to exit window after final orientation of bent jt.! MWD
- Repeated attempts made wI different tool orientations W 10
success
- While roating Dn @ 5 rpm, wI 5,000 ft.llbs torque and running
speed of 30 fpm tagged Btm of window @ 6409', string torqued
up and stalled. Unable to pull free with up wt. of 130K.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
12131/2004 17:00 - 21 :00 4.00 CASE N DFAL PROD3 Released torque and applied 2 rds. to the left in 1/2 turn
, increments and worked torque Dn. Gradually increasing pick up
wt. by 5,000 lb. increments. String pulled free @ 160K,
proceeded to RIH and tag tie-back.
- Repeated rotating Dn process same as before and tagged
again. Continued to apply Rt. hand torque to 7,000 ft.llbs and
increase bit wt. to 35K. String broke free and proceeded to RIH
í to 6465' to confirm string outside window.
21 :00 - 22:00 1.001 CASE N DFAL PROD3 - RIH to 6740' (bull nose depth), confirmed mills pass through
window before prior start of dressing process.
- Dress window w/20,25 & 30 rpm, 350 gpm pump w/1600 psi.
- Work mills f/6390' t/6415' to dress window.
- Work mills fl 6415 t/ 6455' to dress open hole.
- After dressing Up Wt. 125K, Dn Wt. 100K W/O rotating or
circulating.
22:00 - 22:30 CASE DFAL PROD3 1- No abnormal Up Wt. or Dn. Wt. after dressing
0.50 N 1- POH t/6350'
22:30 - 23:30 1.00 CASE N DFAL PROD3 - Circ B/U @ 300 GPM 1350 psi.
- Monitor well
23:30 - 00:00 0.50 CASE N DFAL PROD3 - POH wI mills
1/1/2005 00:00 - 03:30 3.50 CASE N DFAL PROD3 - POH wlpolish mill assy. to BHA
03:30 - 05:30 2.00 CASE N DFAL PROD3 -UD BHA
05:30 - 06:00 0.50 CASE N DFAL PROD3 - Clear floor of excess BHA tools
- Clean floor
06:00 - 07:30 1.50 CASE N DFAL PROD3 - PJSM
- R/U Tbg. handling equip. to RIH w/4 1/2" slotted liner
07:30 - 16:00 8.50 CASE N DFAL PROD3 - MIU & RIH with 4 1/2" liner.
- Avg. make up torque 3600 ft.llbs.
- 1 solid shoe it., 116 its. 4 1/2" slotted liner, 16 jts. 4 1/2" solid
liner, 2 swell pkr. assy.
16:00 - 16:30 0.50 CASE N DFAL PROD3 - CIO elevators
- M/U 75/8" x 41/2" Hook hgr.
- String wt. Up 97K
- String wt. Dn 87K
16:30 - 17:00 0.50 CASE N DFAL PROD3 - RID Tbg. handling equip.
- R/U to RIH wI 4" DP
17:00 - 17:30 ' 0.50 CASE N DFAL PROD3 - RIH wI slotted liner on 4" DP to 6461' (Tagged up on tie-back)
17:30 - 19:00 1.50 CASE IN DFAL PROD3 - UD 2 its. DP and PIU Std. # 10 of 4" DP (needed full std. to
; orient and exit window, allowing tag up on tie-back if needed)
- Orient 1/4 turn to right and attempt exit window (no success)
- Add another 3/4 turn (1 turn total) and exit window
- P/U 2 jts. DP (same ones that were UD) and continue to RIH
19:00 - 23:30 4.50 CASE N DFAL PROD3 - RIH wI slotted liner on 4" DP
- Tagged Billet in OBd lateral @ 7581' (rotate 1/2 turn to right
and work by same, no problem)
23:30 - 00:00 0.50 CASE N DFAL PROD3 - Liner stopped @ 11215', Up Wt. 175K, Dn Wt. 75K
- Reciprocate f/11,180' t/ 11215'
- Rotate 1 turn rt. & work torque dn.
- Add 1 more turn rt. & work pipe
- Add 3 more turns & work pipe until all torque gone. No
success
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/1/2005 23:30 - 00:00 0.50 CASE N DFAL PROD3
1/2/2005 00:00 - 00:30 0.50 CASE N DFAL PROD3 - LID 1 jt. (for longer stroke when reciprocating)
- Rotate 1 turn rt. and reciprocate pipe and using drawworks
braking action to work through tight spot @ 11215'
00:30 - 01 :30 1.00 I CASE N DFAL PROD3 - RIH wI liner on 4" DP t/11 ,971 '.
- Up Wt. 167K
- Dn Wt. 60K
01 :30 - 03:00 1.50 CASE N DFAL PROD3 - POH t/11 ,965' (hook hgr. @ 6392')
- Apply 1 1/2 turns rt, unhook hanger and work pipe dn. to
11,980'
- POH t/11 ,955'
- Apply 3/4 turn rt. and work torque dn & attempt to hang hook
hanger wlo success..
- Apply 1/2 turn and work torque dn. and hang off hgr.
- P/U 10' and unseat hgr. and rehang same. (0215 hrs)
- Drop 1 3/4" ball and chase w/30 spm @ 300 psi to seat same
- Pressure up to 3,000 psi and release from liner
- P/U and verify running tool released from liner
- P/U Wt. 138K
- S/O Wt. 112K
- POH t/ 6360'
03:00 - 03:30 0.50 CASE P PROD3 - CBU @ 66 spm @ 1750 psi (2300 calc. stks)
03:30 - 04:30 1.00 CASE P PROD3 - RIH and tag top of Hook Hgr. @ 6392'
- Blow Dn Top Drive
- Monitor well
04:30 - 07:30 3.00 CASE P PROD3 - POH wI 4" DP
07:30 - 08:00 0.50' CASE P PROD3 · B/O & UD liner running tool
08:00 - 09:00 1.00 CASE P PROD3 - Clean & clear rig floor
09:00 - 09:30 0.50 CASE P PROD3 - PJSM
109:30 - 12:30 · RIU to RIH wI LEM #1 & inner string
3.00 CASE P PROD3 - MIU LEM #1 Assy.; Seal Assy.-3 x 4 1/2" pup jts.; Window
Assy.-
4 1/2" pup jt., Casing Swivel, Seal Bore Ext. (inner string- 2 x 2
7/8" tbg. jts., 2 x 27/8" pup jts., Seals & Nozzle Assy.), ZXP
Pkr. wI Tie-Back Assy.
12:30 - 19:00 6.50 CASE P PROD3 · RIH wI LEM #1 on 4" DP to 6390' (top of hook hgr. @ 6392').
- Running speed as per Baker Rep. was 30' prl min.
· Up WI. 135K
- Dn Wt. 112K
19:00 - 20:00 1.00 CASE P PROD3 -Tagged Hook Hgr. top @ 6392'
- Apply 1 1/2 turns to right & RIH t/6462'
- Up Wt. 137K
- Dn Wt. 110K
- Continue t/ RIH & tag @ 6481'
- Apply 1 1/2 turns & RIH, wlo success
- Brk circ. @ 3 bpm @ 490 psi & circ. dn t/ 6490' (mule shoe
depth). - LEM locator tagged up in Hook Hgr. Collet Profile
@ 6392'
- P/U 10' & S/O to verify LEM engaged wI 20,000# on Pkr.
20:00 - 22:00 2.00 CASE P PROD3 - Brk. TD connection & drop 1 3/4" pkr. setting ball
- Circ. Ball Dn. @ 2 bpm @ 430psi. (bumped ball with 537 stks)
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/2/2005 20:00 - 22:00 2.00 CASE P PROD3 - PIU tJ 2800 psi. to set ZXP Pkr. (hold 5 min), bleed off
pressure
- Close upper pipe rams to test ZXP Pkr. x 7 5/8" csg. tJ 1500
psi., Unable to pressure up (pumped 9 bbls 1104 stks. to 700
psi.), bleed off excess pressure. Suspect Pkr. not fully set.
- Open Rams
. - Pressure up DPI Pkr. tJ 4000 psi. to reset Pkr. (observed
I string wt. fluctuation of app. 10/15000 Ibs), hold 5 min. & bleed
off pressure. Also released running tool during this process.
- Close top rams & retest Pkr x 7 5/8" csg. wI 1500 psi.,
successful
- Pick up 20' (out of pkr.) & rotate dn @ 25 rpm to verify Pkr.
set. Tag LEM tie-back @ 6335', Pkr set @ 6346'
- POH wI circ. sub tJ 6332'
22:00 - 23:00 1.00 CASE P PROD3 - Circ. B/U 6332' (reciprocating Dp) @ 6 bpm @ 1100 psi.
(calc. stks 2400)
- Blow Dn. TD
23:00 - 00:00 1.00 CASE P PROD3 - POH wI LEM running tool on 4" DP
1/3/2005 00:00 - 02:30 2.50 CASE P PROD3 - POH wI LEM running tool on 4" Dp
02:30 - 03:00 0.50 CASE P PROD3 - R/U 2 7/8" handling tools & equip. to UD inner string
03:00 - 03:30 0.50 CASE P PROD3 - B/O & UD LEM Running Tool
03:30 - 04:30 1.00 CASE P PROD3 - UD 2 7/8" Inner string
04:30 - 05:00 0.50 CASE P PROD3 - RID 2 7/8" handling tools & equip.
05:00 - 06:00 1.00 CASE P PROD3 - Clear & Clean rig floor
106:00 - 09:30 3.50 P WEXIT - PJSM
- MIU Whipstock BHA fl OBa lateral (BHA length=1437.90')
I - Orient MWD tJ Whipstock
- Shallow test MWD wI 200 gpm, Tool Pulse 3601 460 psi.
- BHA to Top of Slide------1196.74'
51 stds 4" Dp + 25.47'---4908.10'
Depth to Top of Slide-----61 07.87'
09:30 - 14:00 4.50 STWHIP P WEXIT - RIH wI Whipstock BHA on 4" Dp tJ 6323'
- Run speed 90'1 min.
- String Wt. Up 145K, Dn 110K
14:00 - 14:30 0.50 STWHIP P WEXIT . - Engaged Pump, 300 gpm @ 1980 psi.
1- Reciprocate Dp & Orient Whipstock to 14 deg. Left (obtained
14 good tool faces)
! - RIH & set Whipstock Anchor, Top of Whipstock Slide @
6108'
- PIU to 15K overpull to verify Whipstock set
- S/O and stacked 42K & Sheared Mills free
14:30 - 16:30 2.00 STWHIP P WEXIT - PJSM
- Displace Wellbore fluid tJ MOBM
- 260 bbls @ 300 gpm @ 1980 psi
- Circulated 2 X B/U to condition mud
16:30 - 21 :30 5.001 STWHIP P WEXIT - Mill Window f/6108' tJ 6120' (TD @ 6138')
- WOM 2-3K, RPM 75-100
- Torque 8,000-9,000 ftIlbs
- Pump 320 gpm @ 1800 psi
- String Wt. Up 145K, Dn 107K
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
5-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/3/2005 16:30 - 21 :30 5.00 STWHIP P WEXIT - Retrieving Slot @ 6113' @ 14 deg. Left
21 :30 - 22:30 1.00 STWHIP¡ P WEXIT - Circ. Sweep S/S (Sweep = 40 bbl MOBM + 55 gal. dm HRP)
- Pump 320 gpm @ 1800 psi.
- Ream & back ream window while sweep going around BHA
- RIH through window dry before POH-no problem
- Monitor Well -Static
22:30 - 23:00 0.50 STWHIP¡P WEXIT 1- POH V 5600'
23:00 - 00:00 1.00 STWHIPI P WEXIT 1- PJSM
- Slip and Cut Drlg Line
1/4/2005 00:00 - 02:00 2.00 STWHIP P WEXIT - PJSM
- Slip & Cut 473' bad Drlg Line
02:00 - 04:00 2.00 STWHIPP WEXIT - POH wI Whipstock Mill Assy.
04:00 - 06:30 2.50 STWHIP! P WEXIT - B/O & UD Baker Milling Tools
- Stand back collars and HWDP
06:30 - 08:00 1.50 STWHIP P WEXIT - Clear rig floor of BHA components
i-Clear rig floor & under rotary table
08:00 - 08:30 0.50 STWHIP P WEXIT 1- Rig Service
08:30 - 12:30 4.00 STWHIP N RREP WEXIT i-Repair Top Drive
12:30 - 13:30 1.00 STWHIP P 'WEXIT - MIU Stack Washer
- Functioned BOPE stack & washed to remove metal cuttings
- Flushed Choke, Kill & Flow lines
- Blow Dn. TD, Kill & Choke lines
13:30 - 16:00 2.50 STWHIP P WEXIT - PJSM
- P/U & MIU 63/4" Driectional Drlg. Assy.
- Cleared rig floor, installed Radioactive sources
i - Continue to build BHA
16:00 - 19:30 3.50 STWHIP P WEXIT - RIH wI BHA on 4" Dp
- Shallow pulse test MWD
- Continue RIH V 6050'
19:30 - 20:30 1.00 STWHIP P WEXIT - Establish circulation & Drilg. parameters
- String Wt. Rot. 11 OK
- Up Wt. 120K, Dn Wt. 105K
- ECD 10.0 ppg (calculated)
- Pump 330 gpm @ 2300 psi
- Set Tool Face 14 deg. left
1- Slide through window (6108'-6120') wlo pump tI 6130'
. - Circ Dn. f/6130' V 6138'
20:30 - 00:00 3.50 DRILL P PROD4 - Drlg. f/6138' V 6340' (rotating & sliding)
. WOB Sliding 3/4K
- Wob Rot. 5K
- Rpm 60
- Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftIIbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2300 psi, On Btm 2400 psi
- Calc. ECD 10.0, Act ECD. 10.2
1/5/2005 00:00 - 02:30 2.50 DRILL P PROD4 - Drlg. fl 6340' V 6528' (rotating & sliding)
I - WOB Sliding 3/4K
- WOB Rot. 5K
,- Rpm 60
'- Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftllbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2300 psi, On Btm 2400 psi
- Calc. ECD 10.0, Act ECD. 10.2
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/5/2005
02:30 - 03:00
0.50 DRILL P
PROD4 - Circulate, as per Geolgist (waiting on MWD logs)
- Pump Hi-Vis Sweep (40 bbl MOGM + 55 gal HRP)
- Pump Rate 330 gpm @ 2250 psi.
- Reciprocating, oriented high-side
PROD4 - Drlg. fl 6528' t/7292' (rotating & sliding)
- WOB Sliding 3/4K
- WOB Rot. 7/8K
- Rpm 80
- Torque- Off btm 5,000 ftllbs, On Btm 6,000 ftllbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2400 psi, On Btm 2600 psi
- Calc. ECD 10.18, Act ECD. 10.4
- Strg. Wt. Up 122K, DN 93K, Rot. Wt 108K
03:00 - 12:00
9.00. DRILL . p
I
12:00 - 00:00
12.00 DRILL P
PROD4 - Drlg. fl 7292' t/ 8444' (rotating & sliding)
- WOB Sliding 2K
- WOB Rot. 3/4K
- Rpm 80
- Torque- Off btm 7,000 ftllbs, On Btm 9,000 ftllbs
- Pump Rate 330 gpm
- Pressure-Off Btm 2610 psi, On Btm 2760 psi
- Calc. ECD 10.4, Act ECD. 10.5
- Strg. Wt. Up 125K, DN 88K, Rot. Wt 109K
PROD4 - Drlg. fl 8444' t/ 9310' (rotating & sliding)
- WOB Sliding 4K
- WOB Rot. 5K
- RPM 80
- Torq. On Btm. 7K, Off Btm. 6K
- Pump Rate 330 gpml 92 spm
- Pump Press. Off Btm. 3100 psi, On Btm 3300psi
- Strg. Wt. Up 127K, Dn 98K, Rot. 105K
- Calc. ECD. 10.47, Act ECD. 10.39
- SPR #1 30 spm=590 psi
40 spm= 780 psi
- SPR #2 30 spm=700 psi
40 spm=880 psi
- ART =6.71 hrs. AST =1.29 hrs.
1/6/2005
00:00 - 12:00
12.00 DRILL P
I
12:00 - 00:00
12.00 DRILL P
PROD4 - Drlg. fl 9310' t/10,433' (rotating & sliding)
- WOB Sliding 5/22K
- WOB Rot. 4K
- RPM 80
- Torq. On Btm. 8K, Off Btm. 6K
- Pump Rate 330 gpml 92 spm
- Pump Press. Off Btm. 3,000 psi., On Btm. 3100 psi.
- Strg. Wt. Up 139K, Dn.94K, Rot. 113K
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/6/2005 12:00 - 00:00 12.00 DRILL P PROD4 - Calc. ECD 10.25, Act ECD 10.27
- ART =3.51 hrs., AST =2.82 hrs.
1/7/2005 00:00 - 10:30 10.50 DRILL P PROD4 -Drlg. f/1 0,433' t/11 ,006' (rotating & sliding)
- WOB; Sliding 22/25K, Rot 5K
- RPM 80
- Torq. Off Btm. 6K, On Btm 8K
- Pump Rate 330 gpml 92 stks
- SSP; On Btm 3150 psi., Off Btm 3000 psi
- Strg. Wt., Up 139K, Dn. 94K, Rot 113K
- ECD; Calc. 10.39, Act 10.43
- SPR #1 30 spm=680 psi.
40 spm=850 psi.
- SPR #2 30 spm=680 psi.
40 spm=880 psi.
- Observed intermittent high torque causing rotary to stall (
'torque limiter set at 12,000 ftIlbs). Decision was made to back
ream through inverted section of low permeability zone fl
10,150' t/10,900'
10:30 - 14:30 4.00 DRILL P PROD4 - Backream II 11,006' t/ 9,950' Through inverted low
permeability section.
- RPM 80, Torque 7-9K
- Pump rate; 330 gpm @ 2950 psi.
- String stalled out @ 15,000 ftIlbs torque @ following depths;
'-10,900'-10850',10,725'-10,700',10,600'-10,575',
10,488'-10,450'
10,358'-10,298', 10,164'-10,138', 10.094'-10,044'
- RIH t/11,006'
14:30 - 16:00 1.50 DRILL P PROD4 - Reciprocate & rotate @ 11,006' while circulating
- Pump & circ. 40 bbl. weighted sweep SIS
1- Pump rate 330 gpm @ 2850 psi.
- RPM 80
16:00 - 18:30 2.50 DRILL P PROD4 - Drlg f/11 ,006' t/11, 197' (rotating & sliding)
- WOB; Sliding 25K, Rot. 4K
- RPM 80
- Torque; On Btm. 8/10K, Off Btm. 7K
- Pump; 330 gpml 92 stks.
- SSP; On Btm 3130 psi., Off Btm 2980 psi.
- Strg Wt.; Up 140K, Dn. 87K, Rot. 115K
- ECD; Calc. 10.53, Act. 10.54
- Rotary on TD failed (unable to rotate at all). Continue to circ.
and reciprocate pipe while preparing to trouble shoot rotary
failure
18:30 - 21 :00 2.50 DRILL N RREP PROD4 - Trouble shoot TD rotary failure (reciprocating and circulating
during this process).
- Pump; 330 gpm @ 2960 psi.
- Strg Wt.; Up 143K, Dn.90K
- Suspect rotary rheostat-replace same
21 :00 - 00:00 3.00 DRILL P PROD4 - Drlg f/11 ,006' t/11 ,390' (rotating & sliding)
Printed: 217/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
21 :00 - 00:00 - WOB; Sliding 25K, Rot. 3K
- RPM 80
- Torque; On Btm. 7K, Off Btm. 6K
- Pump; 330 gpml 92 stks.
- SSP; On Btm 3200 psi., Off Btm. 3000psi.
- Strg Wt.; Up 142K, Dn. 80K, Rot. 115K
- ECD; Calc. 10.76 Act. 10.79
1/8/2005 00:00 - 07:00 7.00 DRILL P PROD4 - Drlg. f/11 ,390' t/12, 1 00' (rotating & sliding)
- WOB; Sliding 4K Rot. 5K
- RPM 80
- Torque; On Btm. 7,500 ftllbs, Off Btm. 7,000 ftllbs.
- Pump Rate 330 gpml 92 spm
- SSP; On Btm. 3,280 psi. Off Btm. 3,150 psi.
- Strg. Wt.; Up 150K, Dn.75K, Rot. 114K
- ECD; Calc. 10.68 Act. 10.85
- SPR #1 30 spm=720 psi.
40 spm=900 psi.
SPR #2 30 spm=800 psi.
40 spm=900 psi.
07:00 - 09:00 2.00 DRILL P PROD4 - Circ. Btms. Up x 2, until shaker returns were clean.
- Pump Rate; 330 gpm @ 3,200 psi.
09:00 - 14:00 5.00 DRILL P PROD4 - Wiper Trip f/12, 100' t/6,040'
- Tight Spot @ 10,596', 20K overpull, wrk'd BHA through area,
no overpull after working area.
14:00 - 16:30 2.50 DRILL P PROD4 - Circ. Btms. Up x 2 @ 6,040'
- Pump Rate 330 gpm @ 2,250 psi.
16:30 - 00:00 7.50 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather
- Pump Rate 90 gpm @ 340 psi.
- Strg. Wt.; Up 115K, Dn. 105K, Rot. 111 K
- Reciprocating & Rotating Drill string periodically
1/9/2005 00:00 - 00:00 24.00 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather
- Pump Rate; 90 gpm @ 340 psi.
I - Strg. Wt.; Up 115K, Dn. 105K, Rot. 111 K
¡WAIT I PROD4 - Reciprocating & Rotating periodically
1/1 0/2005 00:00 - 00:00 24.00 DRILL N - Circ. @ 6,040', Phase 3, Wait On Weather
I - Pump Rate; 90 pgm @ 340 psi.
I
- Strg. Wt.; Up 115K, Dn. 105, Rot. 11 K
- Reciprocating & Rotating Dp periodically
1/11/2005 00:00 - 06:00 6.00 DRILL N WAIT PROD4 - Circ @ 6,040', Phase 3, Wait On Weather
- Pump Rate; 90 gpm @ 340 psi
- Strg. Wt.; Up 115K, Dn. 105K, Rot. 11 K
- Reciprocate & Rotate periodically
06:00 - 18:00 12.00 DRILL N WAIT PROD4 - Phase 3 lifted to Phase 2
- Continue to Circ. @ 6,040'
- Mobilize equipment to clean pad & dig out all vac. trucks. 2
forklifts, 1 cat & service vehicles to start dead trucks
- Send Vac. trucks wI SFMOBM back to M-I plant for reheating
wI additions of new mud.
18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Circ. @ 6,040', 90 gpm 1340 psi.
- Clear and clean around rig & pad wI heavy equipment
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/1 9/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/11/2005 18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Clear all exits, walkways, stairs & steps of excess snow & ice
1/12/2005 00:00 - 00:30 0.50 DRILL P PROD4 - B/O TD & Blow Dn same. Change out first jt. (galled face on
tool jt)
00:30 - 02:30 2.00 DRILL P PROD4 - RIH wI 4" Dp & 6 3/4" Directional BHA t/ 9,293'
- Dn. Wt. 75K
02:30 - 03:30 1.00 DRILL P PROD4 - M/U TD, Fill Dp & Brk. Circ. (stage up pumps in 30 stk.
increments)
- Final Pump Rate; 325 gpm @ 2,760 psi.
1- ECD Calc. 10.35, Act. 10.56
- B/O TD & Blow Dn. same
03:30 - 04:30 1.00 DRILL P PROD4 - RIH wI 4" Dp & 63/4" BHA t/12,100'
04:30 - 08:00 . 3.50 DRILL P PROD4 - M/U TD & Brk Circ.
- Pump Rate; ICP 330 gpm I 3,550 psi., FCP 330 gpm I 3,400
psi
-RPM100
- Torque 8,000 ftIlbs
- Strg. WI. Up 112K, Dn. 102K, Rot 108K
- ECD Calc. 10.80, Final Act. 10.89
- Pump 20 bbl. Low-Vis sweep followed by 20 bbl. Weighted
sweep
08:00 - 10:30 2.50 DRILL P I PROD4 - PJSM
- Disp. Well bore to SFMOBM @ 6 bpm 12,370 psi.
10:30 - 13:00 2.50 DRILL P PROD4 - Circ. t/ condition & balance mud in wellbore
- Pump Rate; 330 gpm 13,750 psi.
13:00 - 22:00 9.00 DRILL P PROD4 - PJSM
- POH wI 4" Dp, UD jts. wI bad hard band (Dp & HWDP)
- No significant overpull at window (6,120'-6,108')
- 84 jts 4" Dp & 8 jts. HWDP UD
22:00 - 00:00 2.00 DRILL P PROD4 - POH w/6 3/4" Directional BHA
- PJSM wI Schlumberger before POH wI Radioactive Source
- Clear floor of unnecessary personnel & remove source
1/13/2005 00:00 - 01 :00 1.00 DRILL P PROD4 - UD 6 3/4" Directional BHA
01 :00 - 02:00 1.00 CASE P PROD4 - Clear & Clean Rig Floor
02:00 - 02:30 0.50 CASE P PROD4 - Service Top Drive
02:30 - 05:00 2.50 CASE P PROD4 - P/U & M/U Whipstock Retrieving BHA
- Retrieval Hook, 1 jt. HWDP, Float Sub, MWD, Bumper Sub,
Oil Jar, XO, 24 jts. HWDP= 832.55'
- Shallow Test MWD @ 830'
- Pump Rate; 330 gpm 11000 psi. OK
05:00 - 08:00 3.00 CASE P PROD4 ,- RIH wI 4" Dp & Whipstock Retrieval BHA t/ 5,700'
- SLM Dp in derrick while RIH
- Fill Dp @ 3,200'
Printed: 21712005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/13/2005 08:00 - 09:30 1.50 CASE P PROD4 - PJSM
- Slip & Cut Drlg. Line
109:30 - 11 :00 1.50 I CASE P PROD4 - RIH t/6,090' wI Whpstck Ret'r BHA on 4" Dp
, - Pump Rate; 250 gpm/1230 psi.
1- Strg. Wt; Up 130K, Dn. 102K
1- Orient'd Ret'r Hook, RIH t/6113' & latched Whpstck.
- Pulled 30,000# Overpull & let Jars bleed off
- Pull to 85,000# Overpull & released Anchor
- POH 45' to 6,075'
11 :00 - 11 :30 0.50 CASE P I PROD4 - CBU @ 330 gpm/1 ,950 psi
- Pump Off- Monitor Well- Static
- B/O & BID Top Drive
11 :30 - 14:30 3.00 CASE P PROD4 - POH wI 4" DP
14:30 - 17:00 2.50 CASE P PROD4 - B/O & UD Whpstck Retrieving BHA & Whipstock
- Whipstock showed mills came off @ 9 1/2' , rode high side fl
117:00 - 17:30 1 1/2'
0.50 CASE P PROD4 - Clear & Clean Rig Floor
17:30 - 23:00 5.50 CASE P PROD4 - PJSM
- Remove Wear Ring, Install Test Plug & R/U tJ test
- Test BOPE's tJ 250 psi low/3,500 psi high
- Test witnessed by AOGCC rep.
- RID Test Equip., Remove Test Plug & Install Wear Ring
23:00 - 00:00 1.00 P RUNPRD - PJSM
, - R/U Liner running equip. & handling tools
1/14/2005 00:00 - 06:30 6.50 CASE P RUNPRD - Liner Running Procedure reviewed in PTSM
- RIH wI 141 jts. 41/2" 12.6 # L-80 IBT Slotted Liner, 1 jt. 4
1/2" 12.6 # L-80 IBT Solid Liner (Bent) Shoe Jt. wI Guide
Shoe, 1 jt. 4 1/2" 12.6# L-80 IBT Solid Liner under Hgr.
06:30 - 07:30 - Torque to preset make, Avg. MIU Torque 3,450 ftJlbs.
1.00 CASE P RUNPRD - CIO Elevators
- MIU Hook Hgr, P/U 1 std. Dp & MIU Top Drive
- Circ. 10 bbls through Hgr. @ 330 gpm I 275 psi.
- B/O TD & Blow Dn. Same
- Strg Wt. Up 100K, Dn. 90K
07:30 - 17:30 10.00 CASE P RUNPRD - RIH w/4 1/2" Liner on 4" Dp
- Worked Centrilizers through window, Centrilizers hung up @
17,800',8,470', 8,780'
- Encountered difficulty RIH wI Liner, (corresponding Shoe
Depth 10,300'). Beginning of Inverted section on Low
Permability Zone of OBa @ 10,290'.
,- @ 11,604' began PIU single jts. Dp (1 x 1) & RIH, (giving
! more flexability to work string). Continue to work pipe Dn. tJ
12,082'
- Did not latch HGR. Hook going through window @ 6,120'
- Strg Wt. Up 190K, Dn. 40K
17:30 - 18:30 1.00 CASE P RUNPRD - Reciprocate pipe f/12,065' tJ 12,082', (free up liner string prior
to attempting to hook Hgr).
- Final Strg. Wt. Up 180K, Dn. 40K
- MIU TD & apply 1/4 turn to right. Work pipe & S/O to latch
Hgr. Hook @ 6,120'-successful
- P/U tJ 190K & brk. string free, unlatch Hgr. Hook
- S/O & relatch Hgr. Hook @ same mark, depth 6,120'.
- B/O TD & drop 1 3/4" Baker ball. MIU TD
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/14/2005 17:30 - 18:30 1.00 CASE P RUNPRD - Circ Ball Dn. @ 4 bpm/530 psi., reduce rate tJ 2 bpm last 10
bbls. Total string vol. to ball seat = 55 bbls.
1- Seat ball & pressure up t/3,000 psi. (hold 5 min.)
1- Bleed off pressure tJ 0 psi.
! - P/U 30' to app. 6,090' to verify Running Tool released.
Continue to POH t/6,030'
18:30 - 19:30 1.00' CASE P RUNPRD . - CBU @ 6,030'
1- Pump Rate; 355 gpm I 3,300 psi.
- Strg. Wt. Up 125K, Dn. 108K
- BIO TD & BID same
19:30 - 22:00 2.50 CASE P RUNPRD - POH wI 4" Dp & Liner Running Tool
22:00 - 22:30 0.50 CASE P RUNPRD - UD 4 1/2" Liner Running Tool
! - Make all service brks. as per Baker Rep.
22:30 - 23:00 0.50 CASE P RUNPRD - Clear & Clean Rig Floor
23:00 - 23:30 0.50 TIEBAC P OTHCMP - PJSM
- R/U Liner Running Equip. & Handling Tools fl LEM # 2
23:30 - 00:00 0.50 CONDHL P OTHCMP - RIH wI LEM Assy. # 2
I I - 41/2" Seal Assy. 1 jt. 4 1/2" 12.6 # L-80 IBT Solid Liner
1/15/2005 00:00 - 01 :00 ' 1.00 TIEBAC 'P OTHCMP - RIH wI LEM Assy. #2
- P/U 3 ea. 4 1/2" 12.6# L-80 IBT Solid Liner jts., 3 ea. 4 1/2"
12.6# L-80 IBT Solid Liner Pup jts., 1 ea. Baker LEM Hgr., 1
IOTHCMP ea. Baker Seal Bore Assy.
01 :00 - 01 :30 0.50 TIEBAC P - PJSM
- C/O Elevators
0.501 TIEBAC - Install False Bowl & R/U 27/8" handling tools
01 :30 - 02:00 P OTHCMP - Service Top Drive
02:00 - 05:00 3.00 TIEBAC P OTHCMP - P/U & RIH wI Circ. Nozzle Assy., 9 jts. 2 7/8" 7.7# Inner
Wash String & 2 7/8" Pack-Off Assy.
- Total Length = 281.11'
- CIO Elevators
- P/U & M/U Baker 5 1/2" x 7 5/8" ZXP L TP
05:00 - 05:30 0.50 TIEBAC i P OTHCMP . RID 2 7/8" Handling Tools
05:30 - 12:30 7.00 TIEBAC P OTHCMP - PJSM
- RIH wI LEM #2 on 4" DP tJ 6,103' (top of Liner Hook Hgr)
12:30 - 15:00 2.50 TIEBAC P OTHCMP - MIU TD & Brk Circ. @ 3 bpml 570 psi.
- Strg. Wt. Up 132K, Dn 111 K
- Attempted to run LEM Assy. through Hgr. LEM window, wlo
success, stacked out @ 6,122'.
- PIU 20', turned string in increments of 1; 1/2; 1/4; 1/8 turns
¡attempting to RIH, wlo success, string stacked out @ 6,122'.
Continued to attempt to run through LEM window with &
without pumps wlo success. Rotate string @ 5 rpm (strg.
torque 4K ftllbs) while slacking off through window area wlo
success, stacked out @ 6,122'
- BID Top Drive
15:00 - 17:30 2.50 TIEBAC N DPRB OTHCMP - POH wI 4" DP & LEM #2
17:30 - 18:00 0.50 TIEBAC N DPRB OTHCMP - PJSM
- RIU False Bowl & 2 7/8" Handling Tools
18:00 - 20:00 2.00 TIEBAC N DPRB OTHCMP - UD ZXP L TP & 2 7/8" Pack-off Assy.
- CIO Elevators
- POH 2 7/8" Inner string (stand back in derrick)
- UD 2 7/8" Circ. Nozzle Shoe Assy.
Printed: 2/7/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/15/2005
18:00 - 20:00
20:00 - 20:30
20:30 - 21 :30
21 :30 - 22:30
22:30 - 23:00
23:00 - 00:00
1/16/2005
00:00 - 00:30
00:30 - 01 :00
01 :00 - 06:30
06:30 - 12:00
12:00 - 15:00
15:00 - 16:00
16:00 - 17:00
2.00 TIEBAC N
0.50 TIEBAC N
1.00 TIEBAC N
I
1.00 ¡ TIEBAC IN
0.50 TIEBAC N
I
1.00' TIEBAC N
0.50 TIEBAC N
0.50 TIEBAC N
5.50 TIEBAC N
5.50 TIEBAC N
3.00 TIEBAC N
1.00 TIEBAC N
1.00 TIEBAC N
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB 10THCMP
I
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
I DPRB OTHCMP
DPRB OTHCMP
- No abnormal wear or marks on 2 7/8" Circ. Nozzle Shoe
- C/O Elevators
- RID 2 7/8" Equip. & Handling Tools
- R/U 4 1/2" Equip. & Handling Tools
- POH wI Seal Bore Assy., LEM Hook Hgr., Solid Liner, Seal
'Assy.
- 4 1/2" Mule Shoe lightly scarred in 6 different places around
outside perimeter of shoe. Suspect contact wI Collet Profile of
Liner Hook Hgr.
- RIH w/4 1/2" Bent Seal Assy. Jt. (bend 9' from shoe wI 6"
off-set), 4 ea. 4 1/2" solid liner jts., 3 ea. 4 1/2" solid liner pup
jts., LEM Hook Hgr, Seal Bore Assy.
- CIO Elevators
- RID 41/2" Equip. & Handling Tools
- R/U 2 7/8" Equip. & Handling Tools
- RIH w/2 7/8" Circ. Nozzle Assy. jt., 8 ea. 27/8" Tbg. jts., 5
ea. 2 7/8" Tbg. Pup jts., Pack-Off Assy. (total length = 279.21 ')
- 2 7/8" Circ. Nozzle located 1.97' outside btm. of 4 1/2" Seal
Assy. Mule Shoe
- C/O Elevators
- P/U & MIU ZXP L TP to 2 7/8" Inner String & 4 1/2" Outer
String
- MIU TD & Brk. Circ. @ 4 bpml 350 psi.
- LEM Assy. Strg Wt. Up 45K, Dn. 50K
- Service Top Drive
- RIH wI LEM #2 on 4" Dp tJ 6,055'
- Strg. Wt. Up 133K, Dn. 11 OK
- RIH tJ 6,103', Tag'd Up on Top of Hook Hgr. Rotated string 1
turn & attempted to RIH wI LEM Assy. Through Liner Hook
Hgr. LEM Window, Stacked Out @ 6,122'. MIU TD & brk. circ.,
3 bpml 500 psi. Turned string in increments of 1; 1/2; 1/4; 1/8;
turns attempting to exit LEM window wlo success. Continued
to stack out @ 6,122'. Continued to attempt to exit LEM
window. Occasionally the Mule Shoe Stacked Out @ 6,117',
this depth corresponds with end of Hook Hgr. LEM Window.
Continued to attempt to exit window using alternating braking
actions & different running speeds wlo success. Rotated string
at 5, 10, 20 rpm, Torque 4,500 ftJ Ibs while slacking off wlo
success.
- BID TO
- POH wI LEM #2 on 4" Dp
- SLM on trip out-no change in DP measurment
- PJSM
- B/O & UD ZXP L TP
- POH w/2 7/8" Inner Wash String & stand back in derrick
- Inspect & UD Circ. Nozzle Shoe Assy.
- NO new addtional scarring or marks on Nozzle Shoe
- POH & UD Seal Bore Assy., LEM, 3 ea. 41/2" Solid Liner
pup jts. 3ea. 4 1/2" Solid Liner jts.
- POH w/1 jt. liner & Bent Jt. Seal Assy.
- 4 1/2" Mule Shoe had severe scarring from btm. of shoe up
through first set of seals. Remove damaged mule shoe and
seals fl bent jt. & replaced them with shoe and seals from the
Printed: 21712005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/1 9/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
DPRB OTHCMP - RIH t/6,097', Tag'd Top of Liner Hgr. Rotated 1/4 turn &
continued in hole to 6,117'. P/U above Liner Hgr. Top @ 6,097'
& apply 1/4 turn in string and attempt to exit Liner Hook Hgr.
LEM Window wlo success. Continue to work pipe and apply
1/4 turn increments for each P/U & S/O cycle for 2 full
revolutions attempting to exit window wlo success. Still
stacking out @ 6,117'. String hanging up @ 6,112 and then
breaking loose when 5K Dn. Wt. applied. Suspect mule shoe
oriented towards window, (btm. of Liner Hook Hgr. LEM exit
window @ 6,111 '), but still unable to exit. Apply alternating
braking action while slacking off trying to bounce mule shoe
out window wlo success. Circ. @ 3 bpml 500 psi wI no effect.
1/16/2005 16:00 - 17:00 1.00 TIEBAC N DPRB 10THCMP
I
17:00 - 17:30 0.501 TIEBAC N DPRB IOTHCMP
17:30 - 18:30 1.00 TIEBAC N DPRB OTHCMP
18:30 - 20:00 1.50 TIEBAC N DPRB OTHCMP
I
i
20:00 - 00:00 4.001 TIEBAC N DPRB OTHCMP
1/17/2005 00:00 - 00:30 0.50 TIEBAC N DPRB OTHCMP
00:30 - 03:00
2.50 TIEBAC IN
I
03:00 - 04:00 I 1.00 TIEBAC N
04:00 - 08:00 4.001 TIEBAC N
08:00 - 10:00 2.00 TIEBAC N
10:00 - 11 :30 1.50 TIEBAC N
11 :30 - 16:30 5.00 TIEBAC N
16:30 - 17:30 1.00 TIEBAC N
17:30 - 21 :30 4.00 TIEBAC N
21 :30 . 00:00 2.50 TIEBAC N
DPRB IOTHCMP
I
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
DPRB OTHCMP
orginal seal assy. jt which was not damaged during the first
attempt to land LEM #2.
- Clear & Clean Rig Floor
- Remove Master bushings and vacum out old MOBM from drip
, pan area.
1- RIH w/4 1/2" Bent Jt. wI reconditioned mule shoe and seals
installed. 4ea.4 1/2" Solid jts., 3 ea. 4 1/2" Pup jts., LEM &
new Seal Bore Assy wlo swivel
- RIH w/2 7/8" Tbg. Inner string (total length = 275.16')
- 2 7/8" Nozzle Shoe protruding .84' beyond btm. of 41/2" Mule
Shoe
- PIU ZXP L TP & M/U to 2 7/8" inner string & to 5 1/2" Seal
Bore Assy.
- RIH wI LEM #2 on 4" Dp t/5,225'
- RIH wI LEM #2 on 4" Dp t/ 6,056'
- Strg Wt. Up 132K, Dn. 11 OK
- CBU @ 5 bpml 920 psi
- Monitor Well, Static
- Blow Dn Top Drive
- POH wI LEM #2 assembly on 4" DP.
. Change elevators and rack back 3 stds 2 7/8" inner string.
- LD 41/2" tubing fl LEM #2. Inspect seal assembly - no
obvious signs of scoring or other damage. All seals intact.
. Discuss options wI Anchorage and agree way forward. Wait
on additional tools to be delivered to site from Baker. Cleaning
& general housekeeping while waiting.
- RIH w/2 7/8" Tbg fl derrick and POH & UD same
- PIU Baker "HR" Liner Running Tool Assy. & RIH on 4" Dp t/
6,075'
- Establish Working Parameters
- Strg. Wt; Up 132K, Dn 120K, Rot. 130K
- Rotary; 10 RPM @ 4,500 ftIlbs Torque
- RIH t/6,097', Tagged Top of Liner Hook Hgr. Continued to
RIH & btm'd out in "HR" profile of the Liner Hook Hgr. @ 6,116'
- P/U 10' to verify Running tool engaged. S/O & stack 20,000#
Dn. to verify Running Tool was seated in profile area.
- SIO trying to break string free down, no success
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/17/2005 21 :30 - 00:00 2.50 TIEBAC N DPRB OTHCMP - P/U in 25,000# increments working pipe in attempt to free
liner. @ 300,000# liner came free. Work pipe fl 6,107' tI
6,129' ("HR" Running Tool Depth) until constant hook loads
were established @ Up WI. 185K & Dn. WI. 70K.
- @ 6105' apply 1 1/2 turn, SIO and attemp to hang Liner Hook
Hgr. wlo success. Repeated attempts were made w/1 , 3/4,
-1/2, 114 turns being applied at different intervals while working
string fl 6,107' tI 6,129', wlo success. These depth
settings were established to keep the top of the Liner Hook
Hgr. inside the window @ 6,108' while the "HR" Profile of the
Liner Hook Hgr. was outside the window app. 9/10' @ 6,129'.
- Install 6 turns in string and trap torque of 4,500 ftllbs. Work
pipe through window area. No change in trapped torque.
- Suspect dogs on "HR" Running Tool not engaging properly in
, order to turn Hook Hgr.
1- P/U tI 5,990' & rotate string @ 10 rpm wI 6,500 ft.lbs. torque.
¡Torque being steady @ 6,500 ftllbs verifies that tool is turning,
,not the liner Hook Hgr. & 4 1/2" Slotted Liner
1/18/2005 I
00:00 - 02:00 2.00 TIEBAC N DPRB OTHCMP 1- Work Drlg. String fl 6,107' tI 6.129' attempting to hang Liner
Hook Hgr. @ btm. of widow @ 6'120'. Rotating Dp. in 1/4 turn
increments to change location of hook assy. in attempts to find
window., wlo success.
- Continue to work string while communicating wI Anc. personal
on plan forward.
- Decision was made to POH wI Hook Hgr. Assy. & 4 1/2
"Slotted Liner
02:00 - 06:00 4.00 TIEBAC N DPRB OTHCMP - POH wI Liner Hook Hgr. & 4 1/2" Slotted Liner
I
06:00 - 07:00 1.00 I TIEBAC N DPRB OTHCMP Lay down hook hanger assembly.
07:00 - 08:30 1.50 I TIEBAC N DPRB OTHCMP Clean rig floor. Service rig and TDS.
08:30 - 11 :00 2.50 _ TIEBAC N DPRB OTHCMP , Discuss plan forward with Anchorage team. Rig up to lay down
4.5" liner.
11 :00 - 19:00 8.00 TIEBAC N DPRB OTHCMP Pull and lay down 4.5" liner. Salvage usable centralizers. 25
centralizers damaged beyond future use.
19:00 - 20:00 1.00 TIEBAC N DPRB OTHCMP i Rig down 4.5" liner equipment. Clear and clean rig floor.
20:00 - 21 :00 1.00 TIEBAC N DPRB OTHCMP Pick up mill assembly.
21 :00 - 23:00 2.00 TIEBAC N DPRB OTHCMP RIH with milling assembly. Tag no-go at 6,348'.
23:00 - 00:00 1.00 TIEBAC N DPRB OTHCMP Pull up to 6,113' and attempt to orient to window. Up Wt=125K
Dn Wt=102K
1/19/2005 00:00 - 03:30 3.50 TIEBAC N DPRB OTHCMP Continue attempting to pass through window. Tried slow
rotating while lowering pipe, cease rotation and advancing
orientation by 1/4 turns and advancing orientation by 1/8 turns.
No success.
03:30 - 06:00 2.50 TIEBAC N DPRB OTHCMP POH with mill assembly to change BHA configuration.
06:00 - 07:00 1.00 TIEBAC N DPRB OTHCMP Break out & LD BHA #24 components.
07:00 - 07:30 0.50 TIEBAC N DPRB OTHCMP Service top drive.
07:30 - 10:00 2.50 TIEBAC N DPRB OTHCMP PU components for BHA #25. Bullnose, 4" pup it, 4" bent it, 2
jts 4" DP, MWD, 9 jts 4", 2 ea string mills 6.75" OD, 1 jt 4"
HWDP, jars, also 5 associated crossovers. Orient bent it with
MWD.
10:00 - 11 :00 1.00 TIEBAC N DPRB OTHCMP RIH & shallow test MWD.
11 :00 - 13:30 . 2.50 TIEBAC N DPRB OTHCMP RIH to window depth at 6108'.
,13:30 - 14:30 I 1.00 TIEBAC N IDPRB OTHCMP Orient 15L with MWD. RIH & tag up on L 1 liner top. POH above
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/19/2005 13:30 - 14:30 1.00 TIEBAC N DPRB OTHCMP window and make 2 attempts RIH & POH with slow pipe
rotation, trying to find window with a torque increase - no
success.
Orient bent joint @ 13R and go thru window into open hole.
14:30 - 15:30 1.00 TIEBAC N DPRB OTHCMP Work mills up & down thru window from 6102' to 6140' x5.
Didn't see any indications that mills were doing any work
downhole from torque or rotary indications. Make one pass
without rotating and one pass without rotary or pump - no
problems.
15:30 - 16:30 1.00 TIEBAC N DPRB OTHCMP Pull into shoe and circulate bottoms up. Inspect derrick for ice
or other hazards.
16:30 -19:00 2.50 TIEBAC N DPRB ,OTHCMP Monitor well. Blow down TDS. POOH to BHA.
19:00 - 21 :00 2.00 TIEBAC N DPRB IOTHCMP Lay down Milling assemby and MWD (BHA # 25).
21 :00 - 21 :30 0.50 TIEBAC N DPRB 10THCMP Clear and clean rig floor.
21 :30 - 00:00 2.50 TIEBAC N DPRB OTHCMP PJSM. Rig up and run 4.5" liner as per running detail to 1246'
1/20/2005 00:00 - 04:30 4.50 TIEBAC N DPRB OTHCMP Continue to RIH with 4.5" liner as per detailed running
procedure.
04:30 - 05:30 1.00 TIEBAC N DPRB OTHCMP Chg elevators. PU liner hook hanger and running tool. Up wt
95K Dn wt 87K.
05:30 - 06:30 1.00 TIEBAC N DPRB OTHCMP Run 4.5" liner on Drill Pipe down to window. 100k up. 90k
down.
06:30 - 07:00 0.50 TIEBAC N DPRB OTHCMP Position shoe at mid point of window. Rotate 3 turns to right.
10THCMP Exit window on first attempt.
07:00 - 13:30 6.50 TIEBAC N DPRB Run slotted liner in open hole. Clean to 10420'. From here to
i I TD, took weight in multiple spots but able to PU and work thru
each time. Acted as if centralisers or couplings were hanging
up in the window.
13:30 - 14:15 0.75 TIEBAC N DPRB OTHCMP PU last single of DP. Work pipe & improve PU & SO wts. PU
18' above hook point. Put in 3/4 turn - no success. 1/2 turn. No
success. 1/4 turn - no success. Run deeper past calculated
hook point and get hanger hooked 15' deeper than calculated.
14:15 -15:45 1.50 TIEBAC N DPRB OTHCMP Unhook & hook hanger at same depth x3. Rotate 1/4 turn and
run past hook point. Rotate back 1/4 turn and hook x3.
Unhook and rotate 1/2 turn. RIH - no hook.
PU & rotate another 1/2 turn. RIH & land hook at same depth.
Account for depth discrepancy in tally & verify hook depth is
correct - OK.
15:45 - 16:30 0.75 TIEBAC N DPRB OTHCMP Load ball in drillpipe and pump down on seat. Pressure up to
2000 psi. PU &verify released from liner - OK. Continue
pressuring up and shear ball seat at 3600 psi. Run back in and
verify hanger is at same depth.
16:30 - 17:30 1.00 TIEBAC N DPRB OTHCMP POOH standing back Drill Collars to 5424'.
17:30 - 18:30 1.00 TIEBAC N DPRB OTHCMP PJSM. Slip and cut drill line.
18:30 - 21 :30 ' 3.00 TIEBAC N DPRB OTHCMP POOH (SLM). Lay down hanger running tool. Clear and clean
rig floor.
i 21 :30 - 23:30 2.00 TIEBAC N DPRB OTHCMP PJSM. Rig up and pick up LEM #2
23:30 - 00:00 0.50 TIEBAC N DPRB OTHCMP Change out handling equipment and pick up & run inner string.
1/21/2005 00:00 - 02:30 2.50 TIEBAC N DPRB OTHCMP Pick up and run inner string inside LEM assembly.
02:30 - 03:00 0.50 TIEBAC N SFAL OTHCMP While making up first stand of drill pipe onto LEM assembly, a
1/2" bolt, 2-1/4" long with a 3/4" head broke off of the iron
roughneck and fell past the slips into the hole. Drained the
stack and looked for the bolt without success.
03:00 - 05:00 2.00 TIEBAC N SFAL OTHCMP Gather the rig team, fisherman, LEM tech and ANC staff to
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/21/2005 03:00 - 05:00 2.00 TIEBAC N SFAL i OTHCMP discuss options with all parties.
05:00 - 06:00 1.00 TIEBAC N SFAL 'OTHCMP Bolt is now visible sitting in annular space between 7 5/8"
casing and the liner top packer - laying sideways on tapered
bore at top of wear ring. Call for magnet 1.75" 00. Will attempt
to fish bolt out with this. Change plan as 1.75" magnet will be
too big to go down to bolt.
06:00 - 09:30 3.50 TIEBAC N SFAL OTHCMP Use thin magnet from rig and attempt to retrieve bolt. Make
I several unsuccessful attempts. Change to mechanics magnet -
,stronger. Run in and retrieve bolt which appeared to be almost
brand new.
109:30 - 16:00 6.50 TIEBAC N DPRB OTHCMP RIH with LEM package on drill pipe
16:00 - 17:30 1.50 TIEBAC N DPRB OTHCMP Land LEM on hanger while circulating through workstring when
! seal assembly is entering SBR. Pick up 15K over to verify
LEM is latched into hook hanger.
17:30 - 18:30 1.00 TIEBAC P OTHCMP Drop ball and pump down to seat. Pressure up to 3200 psi to
set ZXP packer and hold pressure for 5 minutes. Increase
I pressure to 4150 psi to release running tool. Bleed pressure to
o psi. Close annular preventer and pressure test packer to
1500 psi for 10 minutes, good test. Pressure up drill pipe to
500 psi and pick up to observe pressure drop to 0 psi, OK.
18:30 - 22:30 4.00 TIEBAC P OTHCMP POOH with LEM running tools and inner string.
22:30 - 00:00 1.50 TIEBAC P OTHCMP Lay down running tools and inner string.
1/22/2005 00:00 - 01 :00 1.00 TIEBAC P OTHCMP Continue laying down LEM running equipment.
01 :00 - 02:00 1.00 TIEBAC P OTHCMP Rig down tubing equipment. Clean rig floor.
02:00 - 06:30 4.50 STWHIP P WEXIT PJSM. Pick up Whipstock assembly, MWD, drill collars and
HWDP. Shallow test MWD.
06:30 - 10:30 4.00 STWHIP P WEXIT RIH with whipstock assembly, orient whipstock to 17L and set
seals at 6063'. Set bottom anchor and shear off mills. 132K
Up Wt. 107K Dn Wt.
10:30·12:15 1.75 STWHIP P WEXIT Displace SFOBM with warm (100 degrees) MOBM at 84 SPM,
112:15 - 12:30 1850 psi. Capture returned SFOBM into vac trucks for return
to mud plant.
0.25 STWHIP P WEXIT Begin milling window. TOW at 5986'.
12:30 - 13:30 1.00 STWHIP P WEXIT Service rig and TDS.
13:30 - 15:30 2.00 STWHIP N RREP WEXIT Problem with TDS brake. Troubleshoot and repair.
15:30·20:30 5.00 STWHIP P WEXIT Resume milling operations. Mill window and 33' of formation to
6018'.
TOW = 5986'
BOW = 5998'
20:30 - 22:30 2.00 STWHIP P WEXIT Circulate bottoms up and pump a hi vis sweep around.
Note-75 Ibs metal captured at surface during milling and
circulating operations.
22:30 - 00:00 1.50 STWHIP P WEXIT POOH from 6018' to 5702'.
1/23/2005 00:00 - 02:00 2.00 STWHIP P WEXIT POOH from 5702' to BHA.
02:00 - 04:30 2.50 STWHIP P WEXIT Stand back HWDP and DC. Lay down milling BHA.
04:30 - 05:00 0.50 STWHIP P WEXIT Clean and clear rig floor.
05:00 - 06:30 1.50 BOPSUF P WEXIT Function and flush BOP stack.
06:30 . 08:30 2.00 STWHIP P WEXIT Pick up 6.75" drilling BHA.
08:30 - 09:30 1.00 STWHIP N RREP WEXIT Repair air valve on top drive.
09:30 - 10:30 1.00 STWHIP( WEXIT Continue PU BHA #27. PJSM & load nuclear source.
10:30·14:30 4.00 STWHIP P WEXIT RIH picking up singles drill pipe from shed.
I
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
Spud Date: 12/29/2000
End: 2/3/2005
11/19/2004
2/3/2005
9ES
1/23/2005
14:30 - 15:00
15:00 - 19:00
19:00 - 20:00
20:00 - 00:00
1/24/2005
00:00 - 12:00
12:00 - 00:00
1/25/2005
00:00 - 08:30
08:30 - 09:00
09:00 - 12:00
12:00 - 00:00
1/26/2005
00:00 - 12:00
12:00 - 00:00
1/27/2005
00:00 - 03:30
03:30 - 04:00
04:00 - 05:00
05:00 - 08:00
08:00 - 20:30
20:30 - 23:00
23:00 - 23:30
0.50 STWHIP P
4.00 STWHIP P
1.00 STWHIP P
WEXIT
WEXIT
WEXIT
4.00 DRILL P
PROD5
12.00 DRILL P
PROD5
12.00¡DRILL Ip
PROD5
8.50 DRILL
0.50 DRILL
3.00 DRILL
P
P
P
PROD5
PROD5
PROD5
12.00 DRILL
P
PROD5
12.00 DRILL
P
PROD5
12.00 DRILL
P
PROD5
Shallow test MWD.
RIH to above top of window at 5958'.
Circulate to establish basline ECD. Orient BHA and pass
through window.
Directional drill 6.75" hole from 6018' to 6250'. PU wt 120K.
SO Wt 105K. TVD 5137'.
Directional drill 6.75" hole from 6250' to 7013'. UP wt 121K.
Dn wt 92K. Rt wt 105K. TO on 5K. TO off 5K. ROT 80.
¡WOB 2K. 332 GPM. 2750 psi. AST 5.28. ART .7.
! Directional drill 6.75" hole from 7013' to 7974'. UP wt 118K.
Dn wt 93K. Rt wt 100K. TO on 5-6K. TO off 5-6K. ROT 80.
WOB 4K. 332 GPM. 2750 psi. AST 3.6. ART 3.16.
i Calculated ECD = 10.00 to 10.10
Actual ECD = 10.4 to 10.52
Directional drill 6.75" hole from 7974' to 8874'.
Circulate sweep around.
Directional drill 6.75" hole from 8874' to 9030'. UP wt 123K.
, Dn wt 88K. Rt wt 105K. TO on 7K. TO off 6K. ROT 80.
¡WOB 5K. 332 GPM. 3000 psi. AST .73. ART 3.27.
Directional drill 6.75" hole from 9030' to 10,056'. UP wt 133K.
Dn wt 91 K. Rt wt 107K. TO on 7K. TO off 6K. ROT 80.
WOB 5K. 310 GPM. 3240 psi. AST 1.72. ART 3.31.
Calculated ECD = 10.48
Actual ECD = 10.89
Continue drilling 6.75" hole 10,056' to 10,765' MD.
138 klbs up. 84 klbs down. 110 klbs rot.
Torque: On btm 8 kit Ibs. Off btm 7 kit Ibs.
330 gpm @ 3380 psi.
I Continue drilling 6.75" hole from 1 0,765' MD to 11,592'.
! 145 klbs up. 78 klbs down. 110 klbs rot.
¡Torque: On btm 8-9 kit Ibs. Off btm 7-8 kit Ibs.
330 gpm @ 3460 psi.
Total for day - AST = 5.37 ART = 2.66
Calculated ECD = 10.61
Actual ECD = 10.80
PROD5 Continue drilling 6.75" hole from 11,592' to 11,943'. ECD at
hardline.
PROD5 CBU and sweep to clean hole and lower ECD
PROD5 Continue drilling 6.75" hole from 11,943' to 12054'. Have
difficulty sliding due to excessive drag. Decision made to TD
hole at this point.
AST = 1.15 ART = .75
PROD5 Circulate and condition hole for short trip.
PROD5 POOH backreaming from 12,054' to 6798'. Tight spot at
10,867'. Worked through, cleaned up.
PROD5 POOH I MAD pass from 6798' to 6084'. 80 rpm, 70spm, 250
gpm, 1900 psi. Pull up above window.
PROD5 Make up and set RTTS at 50'.
3.50 DRILL P
0.50 DRILL P
1.00 DRILL P
3.00 DRILL P
12.50 DRILL P
2.50 DRILL P
0.50 DRILL P
Printed: 217/2005 9:37:45 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
11/19/2004
2/3/2005
9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/27/2005 23:30 - 00:00 0.50 DRILL P PROD5 Pull wear bushing. Set test plug. Rig up and test BOPE.
Witness of test waived by AOGCC Rep Jeff Jones.
1/28/2005 00:00 - 08:00 8.00 CASE P PROD5 Continue test BOPE's tI 250 psi lowl 3,500 psi high. Witness
of test waived by AOGCC Rep., Jeff Jones. Choke line HCR
valve failed test. Top drive upper IBOP failed test.
08:00 - 00:00 16.00 CASE N RREP PROD5 Replace choke line HCR - OK. Replace failed upper IBOP.
When making up, the box of the new one swelled. Remove
same and re-build previous one.
1/29/2005 00:00 - 03:00 3.00 CASE N RREP PROD5 Continue repairs to IBOP. Complete & test same to 250/3500
, psi - OK.
03:00 - 04:30 1.50 CASE P PROD5 Run in and retrieve storm packer and drillstring. Well static. LD
RTTS.
04:30 - 09:30 5.00 CASE P PROD5 RIH to bottom - hole in good condition. Saw slight bobble at
I 10867' but went straight on thru.
09:30 - 12:00 1 2.50 CASE P PROD5 Break circ & stage pumps up to 290 gpm. Pump 20 bbllow vis
sweep followed by 20 bbl weighted sweep surf to surf. 285 gpm
@ 3280 psi. 80 rpm.
12:00 - 14:00 2.00, CASE P PROD5 Displace well to 9.2 ppg solids free MOBM. 285 gpm @ 3200
psi. 80 rpm. CBU X2 to condition & warm mud.
14:00 - 18:30 4.50 CASE P PROD5 Monitor well. Static. POH to window racking back DP. Hole in
good condition - no tight spots.
18:30 - 21 :00 2.50 CASE P PROD5 Cont POH LDDP to 3800'.
21 :00 - 22:00 . 1.00 CASE P PROD5 Service top drive & replace bolts on grabber.
22:00 - 00:00 2.00 CASE P PROD5 Continue POH to 2700' LDDP.
1/30/2005 00:00 - 03: 15 3.25 CASE P PROD5 Continue POH LDDP.
03:15 - 03:30 0.25 CASE P PROD5 PJSM for removing source from LWD tool.
03:30 - 06:30 3.00 CASE P PROD5 Remove RA source. LD BHA #27. Clear & clean rig floor.
106:30 - 08:00 1.50 WHIP P RUNPRD MU whipstock retrieval BHA. Orient and test MWD - OK.
108:00 -11:00 3.00 WHIP P RUNPRD RIH on 4" DP to recover whipstock.
,11.00 - 12.00 1.00 WHIP P RUNPRD Break circ & stage up to 300 gpm @ 1720 psi - 125k up, 102k
down.
Orient hook to 17L and engage hook into whipstock.
Verify engaged. Pull 50 klbs over & let jars bleed off. Increase
to 80 klbs over & release anchor - OK.
112:00 - 13:00 1.00 WHIP P RUNPRD CBU X2 - 300 gpm @ 1750 psi.
Monitor well - static. Blow dn top drive.
13:00 - 16:00 3.00 WHIP P RUNPRD POH with whipstock. Rack back DP & HWDP.
16:00 - 18:30 2.50 WHIP P RUNPRD LD all whipstock retrieving tools & MWD. LD whipstock.
18:30 - 19:30 1.00 WHIP P RUNPRD Clear floor & clean drip pan under rotary table.
19:30 - 20:00 0.50 CASE P RUNPRD RU to run 4.5" liner
20:00 - 20:30 0.50 CASE P RUNPRD PJSM BPX, Doyon, Doyon Casing, MI. Run 4.5" liner.
20:30 - 00:00 3.50 CASE P RUNPRD Run 4.5" 12.6# L-80 IBTslotted liner. -80 jts in @ midnight.
1/31/2005 00:00 - 03:00 3.00 CASE P RUNPRD Continue running 4.5" slotted liner for L3 lateral. 127 jts slotted,
swell packer, 9 solid, swell packer. 2 solid, hook hanger.
03:00 - 04:45 1.75 CASE P RUNPRD I MU hanger to 4" DP. Run in 1 std + 60' to middle of window.
Rotate 3 turns & RIH. Tag previous liner top.
Pull out above window and apply 1/4 turn.
Run in and tag liner top again. Repeat and on 5th 1/4 turn
, applied, exited window successfully.
04:45 - 12:30 7.75 CASE P RUNPRD Run liner into open hole on 4" DP to 11,735'. Saw no problems
when running liner in open hole.
12:30 - 13:00 0.50 CASE P RUNPRD Get weights - 185 klbs up. 85 klbs dn.
MU TD. RIH past hook point to 11812'.
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
1/31/2005 12:30 - 13:00 0.50 CASE P RUNPRD PU 20' and apply 1/4 turn @ surface.
Run in and engage hook hanger to put shoe at 11,804'.
PU & apply 1/2 turn. Run past hook depth.
PU & apply another 1/2 turn. RIH & engage hook. Repeat x 2.
Hanger is hooked on depth.
13:00 - 13:30 0.50 CASE P RUNPRD Drop setting ball & pump on seat - 4 bpm @ 650 psi.
I Pressure up to 3500 psi & release from liner.
PU & verify off liner, PI U Weight 132klbs - OK. PU 50'.
13:30 - 14:30 1.00 CASE P RUNPRD CBU x 2 above liner - 7 bpm @ 1,480 psi.
Monitor well. Run in & tag liner on depth.
Blow down top drive.
14:30 - 16:00 1.50 CASE P RUNPRD PJSM. Slip & cut drilling line. Service top drive.
16:00 - 19:00 3.00 CASE P RUNPRD POH with hook hanger running tool.
19:00 - 19:30 0.50 CASE P I RUNPRD LD liner running tool.
19:30 - 20:00 0.50 CASE P RUNPRD Clear floor & clean under rotary table.
20:00 - 20:45 0.75 CASE P TIEB3 . RU to run 4.5" LEM assembly #3.
20:45 - 21 :00 0.25 CASE P TIEB3 PJSM for running LEM.
21 :00 - 23:00 2.00 I CASE P TIEB3 MU LEM assembly #3 With inner string & setting tool on 1 std
4" DP.
23:00 - 23:30 0.50 CASE P TIEB3 Remove Anadrill pressure sensor from standpipe and plug
outlet.
23:30 - 00:00 0.50 CASE P TIEB3 RIH with LEM assembly on 4" DP.
2/1/2005 00:00 - 04:00 4.00 CASE P TIEB3 RIH wI LEM Assembly #3 on 4" DP to 5,980'. Established
Parameters: String Weight Up 135,000#, String Weight Down
122,000#.
04:00 - 05:00
1.00 CASE P
TIEB3
05:00 - 06:00
1.00 CASE P
TIEB3
06:00 - 06:30 0.50 CASE P TIEB3
06:30 - 10:00 3.50 CASE P TIEB3
10:00 - 10:30 0.50 CASE P TIEB3
10:30 - 14:30 4.00 CASE P TIEB3
M I U Top Drive, Washed Down Through Top of Hook Hanger.
Continued to Wash Down into PBR on L2 LEM. Tagged Up 8'
High on First 2 Attempts, Applied 1/4 Turn x 2 and Landed
LEM Assembly. PI U wI 15,000# Overpull to Verify LEM Collet
in Place.
Dropped Setting Ball and Pumped onto Seat; ICR 4 bpm, 500
psi, FCR 1 bpm, 50 psi. Pressured Up to 4,000 psi to Release
Running Tool and Set ZXP Liner Top Packer, Observed Good
Indication on Surface of Packer Setting. Closed Upper Pipe
Rams and Tested 7-5/8" and ZXP Packer to 1,500 psi f/15
Minutes, OK. Bled Down Pressure, Opened Rams.
POOH w/3 Stands to 5,840'.
Circulated to Condition Mud, Pump Rate 3 bpm, 500 psi.
Waited on Brine Trucks.
Held PJSM wI MI - Rig Crew - Truck Drivers - Tool Pusher -
Drilling Supervisor.
Displaced Wellbore to 9.3 ppg Brine; Pumped 25 bbls LVT
from Pit #4, Shut Down to Clean Pit #4, Pumped 25 bbls 9.3
ppg Viscosified Brine - 50 bbls 9.3 ppg Brine w/1% Safe-Surf-
50 bbls 9.3 ppg Viscosified Brine - 300 bbls Clean 9.3 ppg
Brine, Staged Up Pumps at the Following Rates:
3.5 bpm 600 psi
5.0 bpm 750 psi
6.0 bpm 1,100 psi
Over Displaced By 50 bbls to Ensure Clean Wellbore Fluid.
Printed: 2/7/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
10:30 - 14:30 4.00 CASE P
14:30 - 15:00 0.50 CASE P
15:00 - 16:00 1.00 CASE N RREP
16:00 - 23:30 7.50 CASE P
23:30 - 00:00 0.50 CASE P
00:00 - 02:00 2.00. CASE P
02:00 - 02:30 0.50 I CASE P
02:30 - 04:00 1.50 RUNCOrvP
04:00 - 06:00 2.00 RUNCOIVP
2/1/2005
21212005
06:00 - 14:00
14:00 - 15:00
15:00 - 17:00
17:00 - 18:30
18:30 - 19:30
19:30 - 20:00
20:00 - 21 :00
21 :00 - 22:00
22:00 - 00:00
2/3/2005
00:00 - 00:30
00:30 - 01 :00
8.00 RUNCOMP
I
I
Monitored Well, Static. Blew Down Top Drive.
Serviced Rig
Repaired Top Drive
POOH, LID 4" HWDP, 4-3/4" DC, 4" DP.
RIH wI excess Dp in derrick
POOH & LI D DP
Clear'd & Clean'd Rig Floor
Pull'd Wear Bushing
RUNCMP PJSM
R I U I-Wire Spooler, Overhead Sheaves, Tbg. Tongs & Hand
Tools
RUNCMP PJSM
M I U 4-1/2" Tail Pipe: 4-1/2" Mule Shoe Assy wI 5.60" OD
No-Go Locator - Lwr X Nipple Assy - Upper X Nipple Assy wI
RHC-M Sleeve - 1 Jt 4-1/2" Tubing - 4-1/2" x 7 5/8" Premier
Pkr - 7-5/8" Phoenix Jet Pump Gauge Assy - 4-1/2" Sliding
Sleeve 7" Phoenix Discharge Pressure Gauge Assy. M I U and
Tested I - Wire Connection.
RUNCMP M I U and RIH wI 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I
U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to First 10 Joints,
Then to Every Other Joint. Tested I - Wire Continuity Every 30
Joints.
HMAN RUNCMP Pinched I - Wire on Tubing Slips, Broke Metal Casing. Cut and
Spliced I - Wire. Tested Continuity - OK.
RUNCMP M I U and RIH wI 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I
U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to Every Other
Joint. Tested I - Wire Continuity Every 10 Joints.
I" RUNCMP M I U Jts. #135, #136 for Tag Up on No-Go in Tieback.
String Wt. Up 97K, Dn 92K
Tagged Up @ 16.53' in on Jt. #136, obtain measurements for
Space Out. U D Jts. #136, #135, & #134. PIU & M/U Space
Out Pups 9.80', 9.82', 7.82'. PIU Jt. #134, Tbg. Hgr. & Ldg. Jt.
RUNCMP MIU I-Wire through Tbg. Hgr. and Test Integrety of fittings &
Wire Continuity
RUNCMP RIH & Land Hgr. in Tbg. Spool, Check landing marks to insure
proper land out & RILDS
RUNCMP MIU Circ. Lines to 7 5/8" x 4 1/2" Annulus & Ldg. Jt.
Pressure Test Lines t/4,OOO psi.
RUNCMP "Reverse Circ. 100 bbls. Corrosion Inhibited 9.3 Brine Dn. 75/8"
I x 41/2" Annulus @ 3 bpm @ 200psi
RUNCMP I Drop 1 7/8" BallI Rod Assy. & Pressure up on Tbg. t/ 4,200
I psi. to Set the Pkr. (hold 5 min.). Bleed pressure down to
] 3,500 psi. to Test Tbg. (hold 30 min.). Bleed pressure down to
12,500 psi. & shut in same. Pressure up the 7 518" x 4 1/2" ann.
to 3,500 psi. (hold 30 min.). Bled pressure off Tbg. (2,500 psi)
& allow pressure on the IA (3,500psi.) to shear DCK Valve.
Bleed off all excess pressure. To insure opening of the DCK
Valve Rev. Circ. Dn IA @ 3 bpm @ 900 psi. & then Dn Tbg @
3 bpm @ 875 psi.
RUNCMP Blow Dn. all Circ. Lines & RID same from IA & Ldg Jt.
TIEB3
TIEB3
TIEB3
TIEB3
TIEB3
TIEB3
TIEB3
1.00 RUNCOM\J
2.00 RUNCOrvP
1.50 RUNCOI'v1P
I
1.00 RUNCOrvP
0.50 RUNCOIVP
1.00 RUNCOrvP
1.00 RUNCOrvP
2.00 RUNCOrvP
0.50 RUNCOI'v1P
0.50 RUNCOMP
RUNCMP UD Ldg. Jt., Set TWC in Tbg. Hgr. & Test from below t/1 ,000
psi. OK
Printed: 217/2005 9:37:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-213
S-213
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 11/19/2004
Rig Release: 2/3/2005
Rig Number: 9ES
Spud Date: 12/29/2000
End: 2/3/2005
2/3/2005 01 :00 - 04:30 3.50 BOPSUP P OTHCMP PJSM
NID BOPE, Remove Rotary Master Bushings & clean drip pan
area.
04:30 - 08:30 4.00 WHSUR P OTHCMP PJSM
I NIU Adapter Flange & Tree, Tested Neck Seal & void t/5,000
psi. Good Test
I Test I-Wire Continuity- OK
08:30 - 09:00 0.50 WHSUR P OTHCMP R/U & Test Production Tree t/5,OOO psi. Good Test, RID test
lines.
09:00 - 10:00 1.00 WHSUR P OTHCMP R/U DSM & Pull'd TWC, RID DSM
10:00 - 11 :00 1.00 WHSUR P OTHCMP PJSM
R/U Little Red t/7 5/8" x 41/2" IA. Pressure Test lines t/
3,000psi.
11 :00 - 12:30 1.50 WHSUR P OTHCMP Pump 100 bbls Diesel Freeze Protect @ 2 bpm @ 1,000 psi.
12:30 - 14:00 1.50 WHSUR P OTHCMP i U-Tube Diesel, 200 psi. on IA & Tbg. when done. Wellbore
Fluid.
Hydrostatic Pressure 2,132 psi.
Formation Pressure 2,300 psi.
14:00 - 15:30 1.50 WHSUR P OTHCMP PJSM
R/U DSM Lubricator, Set BPV., RID DSM. Tested BPV t/1 ,000
I psi. from below. OK. Little Red sucked excess diesel from lines
15:30 - 17:00 I & RID same
1.50 WHSUR P OTHCMP RID Secondary IA Valve, DSM Installed VR Plugs
17:00 - 18:00 1.00 WHSUR P OTHCMP Secured Well, Clear & Clean Cellar area.
18:00 - 00:00 6.00 WHSUR P RUNCMP Clean MOBM fl Dp Drain Racks, Drip Pans, All under floor
containments, Misc. Rig Components.
Rig Released @ 2400 hrs. on 2-3-05
Printed: 2/7/2005 9:37:45 AM
S-213AL3 Survey Report Schlumberger
Report Date: 1/27/2005 Survey / DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 237.400'
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure 1 Slot: S-PAD / S-213 TVD Reference Datum: Rotary Table
Well: S-213 TVD Reference Elevation: 61.82 ft relative to MSL
Borehole: S-213AL3 Sea Bed 1 Ground Level Elevation: 35.90 ft relative to MSL
UWVAPI#: 500292299363 Magnetic Declination: 24.754'
Survey Name 1 Date: S-213AL31 January 27, 2005 Total Field Strength: 57615.831 nT
Tort 1 AHD 1 DDII ERD ratio: 401.833' 18462.772 ft / 6.903/1.687 Magnetic Dip: 80.846'
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: January 27,2005
Location Lat/Long: N 70.35551358, W 149.03415537 Magnetic Declination Model: BGGM 2004 .
Location Grid NlE Y/X: N 5980549.840 ftUS, E 618929.960 ftUS North Reference: True North
Grid Convergence Angle: +0.90963906' Total Corr Mag North -> True North: +24.754'
Grid Scale Factor: 0.99991607 Local Coordinates Referenced To: Well Head
I Comments Measured Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(It) (deg) (deg) (It) (It) (It) (It) (II) (II) (II) (deg/100 It) (IIUS) (IIUS)
Projected-Up 0.00 0.00 297.52 -61.82 0.00 -0.02 0.00 0.11 0.05 -0.10 0.00 5980549.89 618929.86 N 70.35551372 W 149.03415617
MWD+IFR:AK 155.42 0.08 297.52 93.60 155.42 -0.04 0.11 0.22 0.10 -0.20 0.05 5980549.94 618929.76 N 70.35551386 W 149.03415697
233.49 0.19 189.70 171.67 233.49 0.08 0.25 0.27 0.00 -0.27 0.29 5980549.84 618929.69 N 70.35551358 W 149.03415754
327.03 0.28 217.18 265.21 327.03 0.44 0.63 0.55 -0.33 -0.43 0.15 5980549.50 618929.53 N 70.35551266 W 149.03415888
415.75 0.46 188.45 353.93 415.75 1.00 1.19 1.06 -0.86 -0.62 0.29 5980548.97 618929.36 N 70.35551123 W 149.03416037
509.99 0.27 140.23 448.17 509.99 1.50 1.76 1.50 -1.40 -0.53 0.37 5980548.43 618929.45 N 70.35550974 W 149.03415966
602.31 0.35 136.82 540.48 602.30 1.76 2.26 1.79 -1.78 -0.20 0.09 5980548.06 618929.79 N 70.35550872 W 149.03415697
694.94 0.40 110.75 633.11 694.93 1.93 2.86 2.12 -2.10 0.30 0.19 5980547.75 618930.29 N 70.35550785 W 149.03415294
787.96 0.15 142.58 726.13 787.95 2.02 3.29 2.41 -2.31 0.68 0.31 5980547.54 618930.67 N 70.35550727 W 149.03414987
883.26 0.36 98.80 821 .43 883.25 2.05 3.70 2.67 -2.45 1.05 0.29 5980547.40 618931.05 N 70.35550687 W 149.03414686
976.53 0.43 98.44 914.70 976.52 1.97 4.34 3.06 -2.55 1.68 0.08 5980547.32 618931.68 N 70.35550661 W 149'0!lltr
1069.16 0.53 98.28 1007.32 1069.14 1.86 5.12 3.62 -2.66 2.45 0.11 5980547.22 618932.45 N 70.35550630 W 149.0 6
1160.63 0.56 78.60 1098.79 1160.61 1.59 5.98 4.23 -2.64 3.31 0.21 5980547.26 618933.31 N 70.35550638 W 149.034 850
1253.35 0.77 70.45 1191.50 1253.32 1.01 7.05 4.93 -2.34 4.34 0.25 5980547.57 618934.34 N 70.35550719 W 149.03412013
1347.39 1.25 70.29 1285.53 1347.35 0.03 8.71 6.16 -1.78 5.90 0.51 5980548.15 618935.89 N 70.35550871 W 149.03410745
1439.53 1.80 76.02 1377.64 1439.46 -1.30 11.16 8.32 -1.09 8.25 0.62 5980548.88 618938.23 N 70.35551059 W 149.03408837
1534.40 1.41 74.91 1472.47 1534.29 -2.67 13.82 10.83 -0.43 10.82 0.41 5980549.58 618940.79 N 70.35551241 W 149.03406747
1630.00 0.74 66.98 1568.05 1629.87 -3.68 15.61 12.53 0.12 12.53 0.72 5980550.16 618942.48 N 70.35551390 W 149.03405364
1723.15 2.46 259.23 1661.18 1723.00 -3.15 17.31 11.12 -0.02 11.12 3.42 5980550.00 618941.08 N 70.35551353 W 149.03406509
1814.13 6.28 254.60 1751.88 1813.70 0.38 24.24 4.72 -1.71 4.40 4.21 5980548.20 618934.39 N 70.35550892 W 149.03411964
1863.71 6.40 256.71 1801.15 1862.97 3.19 29.71 3.19 -3.06 -0.90 0.53 5980546.76 618929.10 N 70.35550522 W 149.03416271
1907.37 6.39 253.07 1844.54 1906.36 5.74 34.58 7.07 -4.33 -5.60 0.93 5980545.42 618924.43 N 70.35550175 W 149.03420081
2000.61 6.09 240.31 1937.24 1999.06 12.18 44.67 17.01 -8.29 -14.86 1.52 5980541 .32 618915.24 N 70.35549093 W 149.03427601
SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( do31 rt-546 )
S-213\S-213\S-213AL3\S-213AL3
Generated 3/7/2005 1 :01 PM Page 1 of 8
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(It) (deg) (deg) (It) (It) (It) (It) (II) (It) (II) (deg/100 It) (ltUS) (IIUS)
2095.16 5.63 239.01 2031.29 2093.11 19.22 54.32 26.66 -13.16 -23.19 0.51 5980536.31 618906.98 N 70.35547762 W 149.03434367
2187.42 5.36 237.61 2123.13 2184.95 25.81 63.16 35.49 -17.80 -30.71 0.33 5980531.56 618899.54 N 70.35546495 W 149.03440472
2282.02 5.13 235.24 2217.33 2279.15 32.44 71.80 44.13 -22.58 -37.91 0.33 5980526.66 618892.41 N 70.35545190 W 149.03446323
2375.30 7.07 239.64 2310.08 2371.90 39.88 81.71 54.03 -27.86 -46.29 2.14 5980521.25 618884.12 N 70.35543747 W 149.03453128
2469.73 12.17 244.54 2403.15 2464.97 50.80 97.48 69.77 -35.08 -60.31 5.47 5980513.81 618870.22 N 70.35541775 W 149.03464505
2503.22 14.39 244.19 2435.74 2497.56 55.96 105.17 77.44 -38.41 -67.24 6.63 5980510.37 618863.34 N 70.35540865 W 149.03470135
2532.82 15.76 243.38 2464.32 2526.14 61.19 112.87 85.12 -41.81 -74.14 4.68 5980506.86 618856.49 N 70.35539935 W 149.03475742
2562.81 17.56 242.48 2493.05 2554.87 67.12 121.46 93.71 -45.73 -81.80 6.06 5980502.82 618848.90 N 70.35538866 W 149.03481957
2591.90 19.43 241.38 2520.64 2582.46 73.60 130.69 102.94 -50.07 -89.94 6.54 5980498.35 618840.84 N 70.35537678 W 149.03488567
2628.07 19.93 240.84 2554.70 2616.52 82.28 142.87 115.12 -55.96 -100.60 1.47 5980492.30 618830.27 N 70.35536070 W 149.03497226
2655.84 20.53 241.04 2580.75 2642.57 89.14 152.48 124.72 -60.62 -109.00 2.17 5980487.50 618821.95 N 70.35534796 W 149.03.2
2686.92 21.45 241.15 2609.77 2671.59 97.08 163.61 135.85 -66.00 -118.74 2.96 5980481.97 618812.29 N 70.35533326 W 149.03 5
2718.71 22.14 240.27 2639.29 2701.11 105.54 175.41 147.66 -71.78 -129.04 2.40 5980476.03 618802.09 N 70.35531748 W 149.03520313
2749.91 23.21 238.46 2668.08 2729.90 114.37 187.44 159.68 -77.91 -139.38 4.09 5980469.73 618791.84 N 70.35530073 W 149.03528714
MWD+IFR:AK 2798.38 24.47 236.38 2712.41 2774.23 129.18 207.03 179.24 -88.46 -155.88 3.12 5980458.92 618775.52 N 70.35527190 W 149.03542112
Tie-In Survey 2856.54 26.47 236.45 2764.92 2826.74 148.37 232.04 204.19 -102.30 -176.72 3.44 5980444.76 618754.90 N 70.35523410 W 149.03559029
Blind ( Inc IAB+Trend) 2909.66 29.58 236.00 2811.80 2873.62 167.58 256.99 229.10 -116.18 -197.46 5.87 5980430.55 618734.39 N 70.35519619 W 149.03575870
Blind ( Inc IAB+ Trend) 3006.92 33.61 231.80 2894.64 2956.46 208.12 307.92 279.81 -146.26 -238.54 4.72 5980399.82 618693.80 N 70.35511399 W 149.03609224
MWD+IFR+MS 3102.80 37.72 227.46 2972.53 3034.35 254.98 363.79 335.10 -182.53 -281.03 5.03 5980362.89 618651.89 N 70.35501492 W 149.03643724
3199.21 41.06 226.91 3047.03 3108.85 307.61 424.97 395.51 -224.11 -325.89 3.48 5980320.61 618607.70 N 70.35490132 W 149.03680152
3295.21 43.34 232.11 3118.17 3179.99 361.63 489.42 459.65 -265.90 -374.94 4.34 5980278.05 618559.32 N 70.35478715 W 149.03719974
3392.93 45.61 237.12 3187.91 3249.73 415.45 557.86 528.06 -305.46 -430.75 4.28 5980237.60 618504.15 N 70.35467904 W 149.03765290
3488.29 44.79 237.13 3255.11 3316.93 466.84 625.52 595.67 -342.19 -487.58 0.86 5980199.98 618447.92 N 70.35457870 W 149.03811430
3584.58 45.23 235.98 3323.18 3385.00 518.99 693.62 663.75 -379.73 -544.40 0.96 5980161.55 618391.71 N 70.35447615 W 149.03857564
3680.92 44.69 235.88 3391.35 3453.17 571.61 761.69 731.81 -417.86 -600.79 0.57 5980122.53 618335.93 N 70.35437195 W 149.03903347
3776.78 45.06 236.81 3459.28 3521.10 623.56 829.33 799.43 -455.34 -657.08 0.79 5980084.16 618280.24 N 70.35426955 W 149.03949057
3873.18 44.60 236.48 3527.65 3589.47 675.54 897.29 867.38 -492.71 -713.85 0.53 5980045.90 618224.08 N 70.35416745 W 149.03995146
3968.74 44.05 237.25 3596.01 3657.83 726.45 964.06 934.13 -529.21 -769.76 0.81 5980008.53 618168.76 N 70.35406773 W 149.0iir
4064.79 43.64 237.36 3665.29 3727.11 776.84 1030.60 1000.63 -565.15 -825.75 0.43 5979971.70 618113.35 N 70.35396952 W 149.0 9
4160.95 43.86 238.30 3734.75 3796.57 826.80 1097.09 1067.08 -600.55 -882.04 0.71 5979935.42 618057.64 N 70.35387279 W 149.0 97
4257.35 43.42 238.37 3804.51 3866.33 876.40 1163.62 1133.54 -635.47 -938.67 0.46 5979899.60 618001.58 N 70.35377736 W 149.04177668
4348.86 43.94 237.59 3870.69 3932.51 923.78 1226.82 1196.70 -668.98 -992.25 0.82 5979865.25 617948.54 N 70.35368580 W 149.04221170
4446.91 43.12 237.35 3941.78 4003.60 974.80 1294.35 1264.21 -705.30 -1049.18 0.85 5979828.04 617892.20 N 70.35358657 W 149.04267393
4545.83 44.42 236.52 4013.21 4075.03 1026.92 1362.77 1332.63 -742.64 -1106.53 1.44 5979789.80 617835.46 N 70.35348455 W 149.04313946
4641.52 44.65 236.80 4081 .42 4143.24 1078.24 1429.89 1399.74 -779.52 -1162.59 0.32 5979752.03 617779.99 N 70.35338376 W 149.04359463
4737.67 43.99 236.28 4150.21 4212.03 1129.69 1497.06 1466.91 -816.56 -1218.64 0.78 5979714.11 617724.54 N 70.35328255 W 149.04404961
4831.97 43.63 236.15 4218.26 4280.08 1179.94 1562.34 1532.19 -852.86 -1272.89 0.39 5979676.96 617670.88 N 70.35318336 W 149.04449008
4928.03 44.71 235.59 4287.16 4348.98 1231.71 1629.28 1599.13 -890.41 -1328.29 1.20 5979638.53 617616.08 N 70.35308073 W 149.04493984
5023.20 44.27 235.98 4355.06 4416.88 1283.37 1695.97 1665.82 -927.92 -1383.45 0.54 5979600.16 617561.54 N 70.35297825 W 149.04538755
5119.83 43.93 235.90 4424.45 4486.27 1335.33 1763.21 1733.06 -965.58 -1439.16 0.36 5979561.62 617506.44 N 70.35287533 W 149.04583980
5216.82 44.04 234.58 4494.24 4556.06 1387.89 1830.57 1800.41 -1003.98 -1494.49 0.95 5979522.35 617451.73 N 70.35277039 W 149.04628899
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( do31 rt-546 )
S-213\S-213\S-213AL3\S-213AL3
Generated 3/7/2005 1 :01 PM Page 2 of 8
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(II) (deg) (deg) (II) ( It) (II) (II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS)
5313.24 44.17 235.63 4563.47 4625.29 1440.36 1897.68 1867.50 -1042.37 -1549.53 0.77 5979483.10 617397.31 N 70.35266549 W 149.04673579
5409.71 43.74 235.73 4632.92 4694.74 1492.30 1964.63 1934.46 -1080.12 -1604.83 0.45 5979444.47 617342.62 N 70.35256232 W 149.04718470
5505.37 45.59 235.49 4700.95 4762.77 1544.50 2031.88 2001.70 -1118.10 -1660.32 1.94 5979405.62 617287.74 N 70.35245853 W 149.04763513
5602.48 48.31 234.89 4767.24 4829.06 1599.92 2102.83 2072.65 -1158.61 -1718.57 2.84 5979364.19 617230.14 N 70.35234781 W 149.04810801
5697.64 51.38 233.90 4828.60 4890.42 1657.35 2175.55 2145.34 -1200.96 -1777.69 3.32 5979320.91 617171.71 N 70.35223208 W 149.04858789
5793.44 54.39 235.09 4886.40 4948.22 1717.57 2251.94 2221.70 -1245.31 -1839.88 3.29 5979275.59 617110.24 N 70.35211089 W 149.04909269
MWD+IFR+MS 5889.06 57.95 233.06 4939.63 5001 .45 1780.56 2331.35 2301.07 -1291.93 -1904.17 4.12 5979227.96 617046.70 N 70.35198349 W 149.04961454
Tie-In Survey 5985.53 61.01 230.89 4988.62 5050.44 1848.27 2414.45 2383.97 -1343.13 -1969.60 3.72 5979175.73 616982.10 N 70.35184357 W 149.05014567
Top Window (Blind) 5986.00 61.03 230.88 4988.85 5050.67 1848.61 7912.97 2384.38 -1343.39 -1969.92 4.65 5979175.47 616981.78 N 70.35184286 W 149.05014826
Base Window (Blind) 5998.00 62.87 230.25 4994.49 5056.31 1857.38 7923.56 2394.93 -1350.12 -1978.10 16.02 5979168.61 616973.71 N 70.35182447 W 149.05021465
End Mill (Blind) 6018.00 64.64 230.75 5003.33 5065.15 1872.26 7941.50 2412.80 -1361.52 -1991.94 9.13 5979156.98 616960.05 N 70.35179329 W 149.0~.9
Blind (Inc IAB+Trend) 6030.60 65.79 231.08 5008.61 5070.43 1881.70 7952.94 2424.20 -1368.74 -2000.82 9.43 5979149.63 616951.29 N 70.35177359 W 149.05 07
Blind (Inc IAB+Trend) 6062.70 68.58 231.90 5021.06 5082.88 1905.95 7982.53 2453.71 -1387.16 -2023.97 9.00 5979130.85 616928.44 N 70.35172325 W 149.05058698
Blind (Inc IAB+Trend) 6095.09 71.86 232.70 5032.02 5093.84 1930.68 8013.00 2484.13 -1405.79 -2048.09 10.39 5979111.84 616904.62 N 70.35167232 W 149.05078271
Blind (Inc IAB+Trend) 6127.29 75.13 233.47 5041.17 5102.99 1955.48 8043.87 2514.97 -1424.33 -2072.77 10.41 5979092.91 616880.24 N 70.35162166 W 149.05098304
Blind ( Inc IAB+ Trend) 6159.01 78.46 234.20 5048.41 5110.23 1980.04 8074.75 2545.84 -1442.55 -2097.70 10.73 5979074.30 616855.61 N 70.35157186 W 149.05118538
Blind ( Inc IAB+Trend) 6190.06 82.53 234.90 5053.54 5115.36 2004.16 8105.36 2576.45 -1460.31 -2122.64 13.29 5979056.15 616830.95 N 70.35152333 W 149.05138783
First MWD+IFR+MS 6223.38 85.48 235.64 5057.02 5118.84 2030.01 8138.50 2609.58 -1479.18 -2149.87 9.12 5979036.84 616804.03 N 70.35147174 W 149.05160886
6255.40 87.88 239.04 5058.87 5120.69 2054.20 8170.46 2641.52 -1496.43 -2176.78 12.98 5979019.17 616777.40 N 70.35142461 W 149.05182726
6286.40 91.35 238.00 5059.08 5120.90 2077.24 8201.46 2672.48 -1512.61 -2203.21 11.69 5979002.57 616751.23 N 70.35138037 W 149.05204181
6318.97 95.16 237.00 5057.23 5119.05 2101.79 8233.97 2704.97 -1530.08 -2230.63 12.09 5978984.67 616724.09 N 70.35133263 W 149.05226437
6351.27 97.51 237.39 5053.67 5115.49 2126.15 8266.07 2737.06 -1547.47 -2257.61 7.37 5978966.86 616697.39 N 70.35128509 W 149.05248337
6383.58 98.93 236.29 5049.05 5110.87 2150.53 8298.05 2769.02 -1564.96 -2284.38 5.54 5978948.95 616670.91 N 70.35123729 W 149.05270065
6412.88 98.90 234.95 5044.51 5106.33 2173.00 8326.99 2797.97 -1581.31 -2308.27 4.52 5978932.23 616647.28 N 70.35119262 W 149.05289454
6444.10 101.02 232.34 5039.11 5100.93 2197.52 8357.74 2828.70 -1599.53 -2333.03 10.67 5978913.61 616622.82 N 70.35114281 W 149.05309552
6475.29 102.53 230.73 5032.74 5094.56 2222.53 8388.27 2859.15 -1618.52 -2356.94 7.00 5978894.25 616599.22 N 70.35109091 W 149.05328955
6506.77 102.28 227.23 5025.98 5087.80 2248.48 8419.02 2889.70 -1638.70 -2380.13 10.89 5978873.71 616576.35 N 70.35103577 W 149.05347778
6539.29 102.17 224.73 5019.09 5080.91 2276.15 8450.80 2921.05 -1660.78 -2402.98 7.52 5978851.26 616553.85 N 70.35097542 W 149.0lir
6570.44 100.46 223.89 5012.98 5074.80 2303.18 8481.34 2951.03 -1682.64 -2424.32 6.09 5978829.07 616532.87 N 70.35091569 W 149.0 9
6603.19 96.95 224.02 5008.02 5069.84 2331.91 8513.71 2982.78 -1705.94 -2446.78 10.72 5978805.42 616510.78 N 70.35085202 W 149.0 72
6634.08 93.54 224.09 5005.20 5067.02 2359.19 8544.47 3012.97 -1728.04 -2468.17 11.04 5978782.98 616489.74 N 70.35079161 W 149.05419228
6666.97 91.76 222.39 5003.68 5065.50 2388.54 8577.32 3045.14 -1751.98 -2490.67 7.48 5978758.70 616467.62 N 70.35072621 W 149.05437491
6698.95 92.10 219.09 5002.60 5064.42 2417.69 8609.28 3076.14 -1776.19 -2511.53 10.37 5978734.16 616447.16 N 70.35066004 W 149.05454416
6730.26 91.76 215.60 5001.55 5063.37 2446.93 8640.57 3106.01 -1801.06 -2530.51 11.19 5978708.99 616428.58 N 70.35059207 W 149.05469817
6762.91 92.58 212.20 5000.31 5062.13 2478.07 8673.20 3136.56 -1828.14 -2548.71 10.70 5978681.63 616410.82 N 70.35051809 W 149.05484580
6794.38 92.89 209.60 4998.81 5060.63 2508.52 8704.63 3165.42 -1855.11 -2564.85 8.31 5978654.41 616395.11 N 70.35044439 W 149.05497676
6826.92 93.65 208.96 4996.95 5058.77 2540.21 8737.12 3194.93 -1883.44 -2580.73 3.05 5978625.83 616379.67 N 70.35036697 W 149.05510566
6858.92 93.61 207.08 4994.93 5056.75 2571.50 8769.06 3223.69 -1911.64 -2595.74 5.86 5978597.40 616365.12 N 70.35028994 W 149.05522737
6891.33 93.41 208.34 4992.94 5054.76 2603.24 8801.41 3252.82 -1940.27 -2610.78 3.93 5978568.53 616350.53 N 70.35021168 W 149.05534940
6922.88 94.54 206.99 4990.75 5052.57 2634.12 8832.88 3281.20 -1968.15 -2625.39 5.57 5978540.43 616336.37 N 70.35013552 W 149.05546795
6955.16 94.99 203.45 4988.07 5049.89 2665.91 8865.05 3309.66 -1997.25 -2639.10 11.02 5978511.12 616323.13 N 70.35005601 W 149.05557912
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( do31 rt-546 )
S-213\S-213\S-213AL3\S-213AL3
Generated 31712005 1 :01 PM Page 3 of 8
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(II) (deg) (deg) (II) (It) (II) (It) (It) (II) (It) (deg/100 II) (IIUS) (IIUS)
6987.42 93.17 200.50 4985.78 5047.60 2697.94 8897.22 3337.30 -2027.08 -2651.14 10.72 5978481.10 616311.56 N 70.34997449 W 149.05567676
7018.49 92.38 199.46 4984.27 5046.09 2728.92 8928.26 3363.48 -2056.25 -2661.74 4.20 5978451.78 616301.43 N 70.34989481 W 149.05576275
7049.51 92.69 198.50 4982.90 5044.72 2759.88 8959.25 3389.42 -2085.55 -2671.82 3.25 5978422.32 616291.81 N 70.34981474 W 149.05584448
7083.30 92.79 199.95 4981.28 5043.10 2793.59 8993.00 3417.83 -2117.42 -2682.93 4.30 5978390.28 616281.21 N 70.34972767 W 149.05593461
7115.23 92.24 197.89 4979.88 5041.70 2825.46 9024.90 3444.69 -2147.59 -2693.27 6.67 5978359.95 616271.35 N 70.34964522 W 149.05601848
7145.60 90.45 197.04 4979.17 5040.99 2855.82 9055.26 3469.91 -2176.55 -2702.39 6.52 5978330.85 616262.70 N 70.34956610 W 149.05609236
7178.37 90.45 197.16 4978.91 5040.73 2888.59 9088.03 3497.11 -2207.88 -2712.02 0.37 5978299.38 616253.56 N 70.34948052 W 149.05617048
7211.12 91.83 197.29 4978.26 5040.08 2921.33 9120.77 3524.42 -2239.15 -2721.72 4.23 5978267.96 616244.36 N 70.34939508 W 149.05624910
7242.53 91.62 197.52 4977.32 5039.14 2952.72 9152.17 3550.75 -2269.11 -2731.11 0.99 5978237.86 616235.45 N 70.34931322 W 149.05632524
7275.05 91.11 198.27 4976.54 5038.36 2985.22 9184.68 3578.24 -2300.04 -2741.10 2.79 5978206.77 616225.95 N 70.34922869 W 149.05640624
7306.26 91.17 197.63 4975.92 5037.74 3016.41 9215.88 3604.73 -2329.73 -2750.71 2.06 5978176.94 616216.81 N 70.34914759 W 149.0.1
7339.21 92.62 197.30 4974.83 5036.65 3049.34 9248.81 3632.62 -2361.14 -2760.60 4.51 5978145.38 616207.43 N 70.34906176 W 149.05 5
7370.55 92.13 197.80 4973.53 5035.35 3080.65 9280.12 3659.23 -2391.00 -2770.04 2.23 5978115.38 616198.46 N 70.34898019 W 149.05664090
7402.53 91.79 198.24 4972.44 5034.26 3112.60 9312.09 3686.62 -2421.39 -2779.93 1.74 5978084.83 616189.06 N 70.34889715 W 149.05672107
7434.94 91.14 197.96 4971.61 5033.43 3144.99 9344.48 3714.47 -2452.19 -2789.99 2.18 5978053.88 616179.49 N 70.34881301 W 149.05680269
7467.15 91.83 197.39 4970.78 5032.60 3177.18 9376.68 3742.10 -2482.87 -2799.77 2.78 5978023.06 616170.20 N 70.34872918 W 149.05688195
7499.01 92.17 196.83 4969.66 5031 .48 3209.02 9408.52 3769.34 -2513.30 -2809.14 2.06 5977992.48 616161.32 N 70.34864604 W 149.05695790
7530.39 91.93 196.82 4968.54 5030.36 3240.38 9439.88 3796.15 -2543.32 -2818.21 0.77 5977962.33 616152.72 N 70.34856402 W 149.05703149
7563.37 91.86 197.03 4967.45 5029.27 3273.34 9472.85 3824.44 -2574.85 -2827.81 0.67 5977930.65 616143.62 N 70.34847787 W 149.05710928
7595.14 91.55 195.43 4966.50 5028.32 3305.09 9504.60 3851.57 -2605.34 -2836.68 5.13 5977900.02 616135.23 N 70.34839456 W 149.05718123
7627.17 91.38 192.34 4965.69 5027.51 3337.07 9536.62 3878.29 -2636.42 -2844.37 9.66 5977868.83 616128.05 N 70.34830965 W 149.05724350
7659.32 91.42 190.84 4964.90 5026.72 3369.09 9568.76 3904.47 -2667.90 -2850.82 4.67 5977837.25 616122.09 N 70.34822363 W 149.05729581
7691.11 91.31 189.38 4964.14 5025.96 3400.67 9600.54 3929.97 -2699.19 -2856.40 4.60 5977805.88 616117.01 N 70.34813815 W 149.05734100
7723.25 92.72 188.19 4963.01 5024.83 3432.50 9632.66 3955.39 -2730.93 -2861.31 5.74 5977774.07 616112.61 N 70.34805143 W 149.05738072
7754.76 92.96 189.42 4961.45 5023.27 3463.68 9664.13 3980.39 -2762.03 -2866.13 3.97 5977742.90 616108.29 N 70.34796646 W 149.05741972
7786.82 92.96 188.83 4959.80 5021.62 3495.43 9696.15 4006.03 -2793.64 -2871.20 1.84 5977711.21 616103.71 N 70.34788010 W 149.05746084
7817.87 92.79 188.46 4958.24 5020.06 3526.15 9727.16 4030.79 -2824.30 -2875.86 1.31 5977680.48 616099.54 N 70.34779633 W 149.05749858
7851.72 93.37 187.99 4956.42 5018.24 3559.60 9760.96 4057.73 -2857.76 -2880.70 2.20 5977646.96 616095.23 N 70.34770494 W 149.0ilir
7882.85 94.03 186.04 4954.41 5016.23 3590.23 9792.03 4082.19 -2888.59 -2884.49 6.60 5977616.08 616091.93 N 70.34762071 W 149.0 2
7914.40 93.10 186.19 4952.45 5014.27 3621.20 9823.52 4106.76 -2919.90 -2887.85 2.99 5977584.72 616089.07 N 70.34753517 W 149.0 55
7947.02 91.86 185.18 4951.04 5012.86 3653.20 9856.10 4132.13 -2952.32 -2891.08 4.90 5977552.25 616086.36 N 70.34744657 W 149.05762165
7978.59 91.76 185.06 4950.04 5011.86 3684.13 9887.66 4156.61 -2983.75 -2893.89 0.49 5977520.78 616084.05 N 70.34736071 W 149.05764441
8011.01 91.62 185.13 4949.08 5010.90 3715.90 9920.06 4181.83 -3016.03 -2896.77 0.48 5977488.47 616081.68 N 70.34727253 W 149.05766767
8042.99 91.89 186.02 4948.10 5009.92 3747.28 9952.03 4206.97 -3047.84 -2899.88 2.91 5977456.61 616079.08 N 70.34718561 W 149.05769277
8075.08 92.21 184.77 4946.96 5008.78 3778.74 9984.10 4232.23 -3079.77 -2902.89 4.02 5977424.64 616076.57 N 70.34709839 W 149.05771714
8105.69 92.03 185.61 4945.82 5007.64 3808.73 10014.69 4256.34 -3110.23 -2905.66 2.80 5977394.14 616074.29 N 70.34701516 W 149.05773951
8137.82 92.17 184.80 4944.65 5006.47 3840.21 10046.80 4281.74 -3142.21 -2908.57 2.56 5977362.13 616071.89 N 70.34692781 W 149.05776305
8170.02 92.58 183.92 4943.31 5005.13 3871.66 10078.97 4306.99 -3174.29 -2911.02 3.01 5977330.01 616069.95 N 70.34684017 W 149.05778280
8202.34 93.34 184.85 4941.64 5003.46 3903.21 10111.25 4332.42 -3206.47 -2913.48 3.71 5977297.80 616067.99 N 70.34675225 W 149.05780273
8234.10 93.16 184.86 4939.84 5001.66 3934.27 10142.95 4357.65 -3238.06 -2916.17 0.57 5977266.17 616065.81 N 70.34666593 W 149.05782441
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 )
S-213\S-213\S-213AL3\S-213AL3
Generated 3/7/2005 1 :01 PM Page 4 of 8
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(It) (deg) (deg) (II) (It) ( It) (II) (It) (It) ( It) (deg/100 II) (ftUS) (IIUS)
8265.84 92.75 184.58 4938.21 5000.03 3965.29 10174.65 4382.91 -3269.65 -2918.78 1.56 5977234.54 616063.71 N 70.34657962 W 149.05784548
8298.57 92.68 185.47 4936.66 4998.48 3997.33 10207.35 4409.16 -3302.22 -2921.64 2.72 5977201.94 616061.36 N 70.34649065 W 149.05786862
8331.02 91.93 185.31 4935.35 4997.17 4029.14 10239.77 4435.39 -3334.50 -2924.69 2.36 5977169.62 616058.83 N 70.34640246 W 149.05789324
8362.47 90.90 185.74 4934.57 4996.39 4060.00 10271.21 4460.95 -3365.80 -2927.71 3.55 5977138.28 616056.30 N 70.34631697 W 149.05791771
8392.11 90.69 185.60 4934.16 4995.98 4089.10 10300.85 4485.16 -3395.29 -2930.64 0.85 5977108.75 616053.84 N 70.34623639 W 149.05794138
8426.07 90.18 186.03 4933.91 4995.73 4122.47 10334.81 4513.02 -3429.07 -2934.08 1.96 5977074.92 616050.93 N 70.34614409 W 149.05796919
8457.74 90.56 184.20 4933.70 4995.52 4153.51 10366.47 4538.86 -3460.61 -2936.90 5.90 5977043.34 616048.61 N 70.34605792 W 149.05799201
8489.94 91.38 182.83 4933.16 4994.98 4184.88 10398.67 4564.68 -3492.75 -2938.88 4.96 5977011.18 616047.15 N 70.34597013 W 149.05800793
8522.27 91.38 184.76 4932.38 4994.20 4216.40 10430.99 4590.77 -3525.00 -2941.02 5.97 5976978.91 616045.52 N 70.34588203 W 149.05802519
8553.98 91.14 183.57 4931.68 4993.50 4247.36 10462.69 4616.56 -3556.61 -2943.32 3.83 5976947.26 616043.72 N 70.34579565 W 149.05804377
8585.92 90.80 182.59 4931.14 4992.96 4278.42 10494.63 4642.26 -3588.50 -2945.04 3.25 5976915.35 616042.51 N 70.34570853 W 149.0.0
8618.19 90.93 182.86 4930.65 4992.47 4309.75 10526.89 4668.19 -3620.73 -2946.57 0.93 5976883.10 616041.49 N 70.34562048 W 149.0 4
8650.24 90.97 181.85 4930.12 4991.94 4340.82 10558.94 4693.89 -3652.75 -2947.89 3.15 5976851.07 616040.68 N 70.34553301 W 149.05 3
8681 .44 90.11 182.73 4929.83 4991.65 4371.06 10590.14 4718.97 -3683.92 -2949.13 3.94 5976819.88 616039.93 N 70.34544784 W 149.05809055
8714.76 89.32 184.61 4929.99 4991.81 4403.54 1 0623.46 4746.30 -3717.17 -2951.27 6.12 5976786.61 616038.33 N 70.34535701 W 149.05810775
8746.52 89.22 185.21 4930.40 4992.22 4434.65 10655.21 4772.80 -3748.81 -2953.98 1.92 5976754.93 616036.11 N 70.34527057 W 149.05812971
8777.94 89.05 182.79 4930.87 4992.69 4465.31 10686.63 4798.80 -3780.15 -2956.18 7.72 5976723.56 616034.42 N 70.34518495 W 149.05814739
8810.51 89.08 183.36 4931.40 4993.22 4496.98 10719.20 4825.53 -3812.67 -2957.92 1.75 5976691.02 616033.19 N 70.34509611 W 149.05816146
8842.28 87.68 183.15 4932.30 4994.12 4527.89 10750.95 4851.72 -3844.38 -2959.73 4.46 5976659.30 616031.89 N 70.34500949 W 149.05817600
8874.56 86.54 187.77 4933.93 4995.75 4559.52 10783.19 4879.04 -3876.46 -2962.79 14.72 5976627.17 616029.33 N 70.34492184 W 149.05820078
8906.71 86.16 186.84 4935.98 4997.80 4591.19 10815.28 4906.83 -3908.28 -2966.87 3.12 5976595.29 616025.76 N 70.34483490 W 149.05823378
8938.36 85.96 185.42 4938.15 4999.97 4622.24 10846.85 4933.90 -3939.68 -2970.24 4.52 5976563.85 616022.89 N 70.34474913 W 149.05826105
8970.53 85.92 186.33 4940.43 5002.25 4653.78 10878.94 4961.40 -3971.60 -2973.53 2.82 5976531.88 616020.11 N 70.34466192 W 149.05828760
9002.92 86.16 186.38 4942.67 5004.49 4685.58 10911.25 4989.27 -4003.71 -2977.10 0.76 5976499.72 616017.04 N 70.34457418 W 149.05831652
9034.75 86.95 187.90 4944.58 5006.40 4716.92 10943.03 5016.95 -4035.24 -2981.05 5.37 5976468.14 616013.59 N 70.34448806 W 149.05834847
9067.16 86.61 188.44 4946.40 5008.22 4748.94 10975.38 5045.47 -4067.27 -2985.65 1.97 5976436.04 616009.51 N 70.34440055 W 149.05838569
9098.87 87.37 188.49 4948.06 5009.88 4780.29 11007.05 5073.50 -4098.59 -2990.31 2.40 5976404.65 616005.34 N 70.34431498 W 149.05842342
9130.46 88.91 188.29 4949.09 5010.91 4811.54 11038.62 5101.47 -4129.82 -2994.92 4.92 5976373.35 616001.23 N 70.34422964 W 149.05846070
9162.47 88.57 189.25 4949.79 5011.61 4843.25 11070.62 5129.96 -4161.45 -2999.80 3.18 5976341.65 615996.86 N 70.34414323 W 149.0.9
9194.37 88.98 188.00 4950.48 5012.30 4874.84 11102.52 5158.35 -4192.98 -3004.58 4.12 5976310.05 615992.57 N 70.34405709 W 149.0 1
9226.50 89.22 186.95 4950.98 5012.80 4906.56 11134.64 5186.70 -4224.83 -3008.76 3.35 5976278.14 615988.90 N 70.34397006 W 149.05857272
9259.04 88.98 184.01 4951 .49 5013.31 4938.49 11167.18 5214.91 -4257.22 -3011.87 9.06 5976245.71 615986.31 N 70.34388159 W 149.05859783
9290.23 91.14 183.53 4951 .46 5013.28 4968.91 11198.37 5241.52 -4288.34 -3013.92 7.09 5976214.57 615984.75 N 70.34379657 W 149.05861437
9320.60 91.35 182.37 4950.80 5012.62 4998.42 11228.73 5267.25 -4318.66 -3015.48 3.88 5976184.23 615983.67 N 70.34371373 W 149.05862695
9351.69 91.00 181.44 4950.16 5011.98 5028.50 11259.81 5293.34 -4349.73 -3016.51 3.20 5976153.15 615983.13 N 70.34362886 W 149.05863523
9382.10 90.69 180.66 4949.71 5011.53 5057.80 11290.22 5318.67 -4380.13 -3017.07 2.76 5976122.75 615983.06 N 70.34354581 W 149.05863965
9413.59 89.77 180.73 4949.59 5011.41 5088.09 11321.71 5344.85 -4411.61 -3017.45 2.93 5976091.26 615983.18 N 70.34345979 W 149.05864265
9443.16 88.81 179.83 4949.95 5011.77 5116.47 11351.28 5369.36 -4441.18 -3017.60 4.45 5976061.70 615983.50 N 70.34337901 W 149.05864373
9475.32 89.84 180.13 4950.33 5012.15 5147.30 11383.44 5395.98 -4473.34 -3017.59 3.34 5976029.55 615984.02 N 70.34329116 W 149.05864353
9505.66 89.22 180.98 4950.58 5012.40 5176.46 11413.77 5421.32 -4503.68 -3017.88 3.47 5975999.21 615984.21 N 70.34320828 W 149.05864581
9536.25 88.98 181.64 4951.06 5012.88 5205.98 11444.36 5447.14 -4534.25 -3018.58 2.30 5975968.63 615984.00 N 70.34312474 W 149.05865139
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Sld( do31 rt-546 )
S-213\S-213\S-213AL3\S-213AL3
Generated 3/7/2005 1 :01 PM Page 5 of 8
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(II) (deg) (deg) (II) (II) (II) (II) (II) (It) (II) (deg/100 II) (IIUS) (IIUS)
9566.58 89.70 181.27 4951.41 5013.23 5235.26 11474.69 5472.82 -4564.57 -3019.35 2.67 5975938.31 615983.71 N 70.34304192 W 149.05865754
9597.05 89.87 181.84 4951.52 5013.34 5264.69 11505.16 5498.71 -4595.03 -3020.18 1.95 5975907.84 615983.37 N 70.34295871 W 149.05866415
9625.82 89.12 180.99 4951.78 5013.60 5292.46 11533.93 5523.15 -4623.79 -3020.89 3.94 5975879.08 615983.11 N 70.34288014 W 149.05866982
9658.47 88.64 181.04 4952.42 5014.24 5323.92 11566.57 5550.82 -4656.43 -3021.47 1.48 5975846.44 615983.05 N 70.34279097 W 149.05867441
9689.03 88.71 179.83 4953.12 5014.94 5353.27 11597.12 5576.60 -4686.98 -3021.70 3.96 5975815.89 615983.30 N 70.34270751 W 149.05867619
9719.80 88.36 180.16 4953.91 5015.73 5382.75 11627.88 5602.47 -4717.74 -3021.70 1.56 5975785.13 615983.80 N 70.34262348 W 149.05867606
9752.02 88.67 178.89 4954.74 5016.56 5413.55 11660.09 5629.48 -4749.95 -3021 .43 4.06 5975752.94 615984.57 N 70.34253549 W 149.05867379
9781.86 89.39 179.35 4955.25 5017.07 5442.02 11689.93 5654.43 -4779.78 -3020.97 2.86 5975723.12 615985.51 N 70.34245399 W 149.05866998
9812.78 89.53 178.66 4955.54 5017.36 5471.50 11720.85 5680.30 -4810.69 -3020.43 2.28 5975692.22 615986.53 N 70.34236954 W 149.05866552
9843.42 89.12 179.70 4955.90 5017.72 5500.74 11751.48 5706.03 -4841.33 -3019.99 3.65 5975661.60 615987.46 N 70.34228585 W 149.05866186
9873.85 89.25 178.42 4956.33 5018.15 5529.76 11781.91 5731.60 -4871.75 -3019.50 4.23 5975631.19 615988.44 N 70.34220274 W 149.05_
9905.24 89.49 179.61 4956.68 5018.50 5559.70 11813.30 5758.02 -4903.13 -3018.96 3.87 5975599.82 615989.48 N 70.34211700 W 149.05
9935.12 89.49 179.77 4956.95 5018.77 5588.29 11843.18 5783.40 -4933.01 -3018.79 0.54 5975569.96 615990.11 N 70.34203538 W 149.058 82
9965.48 88.81 179.33 4957.40 5019.22 5617.32 11873.53 5809.19 -4963.37 -3018.56 2.67 5975539.61 615990.83 N 70.34195245 W 149.05864978
9996.49 88.29 180.37 4958.18 5020.00 5647.02 11904.53 5835.65 -4994.36 -3018.47 3.75 5975508.62 615991.41 N 70.34186776 W 149.05864902
10030.36 90.04 179.96 4958.67 5020.49 5679.51 11938.40 5864.71 -5028.23 -3018.57 5.31 5975474.76 615991.85 N 70.34177525 W 149.05864970
10060.46 89.91 178.89 4958.69 5020.51 5708.27 11968.50 5890.38 -5058.33 -3018.27 3.58 5975444.67 615992.63 N 70.34169302 W 149.05864715
10091.84 89.60 180.13 4958.82 5020.64 5738.28 11999.88 5917.21 -5089.70 -3018.00 4.07 5975413.31 615993.39 N 70.34160730 W 149.05864487
10125.50 89.91 183.00 4958.97 5020.79 5770.79 12033.54 5946.64 -5123.35 -3018.92 8.58 5975379.65 615993.01 N 70.34151539 W 149.05865222
10157.44 90.18 181.47 4958.94 5020.76 5801.74 12065.48 5974.79 -5155.26 -3020.17 4.86 5975347.73 615992.27 N 70.34142820 W 149.05866222
10189.39 90.83 178.58 4958.66 5020.48 5832.37 12097.43 6002.38 -5187.21 -3020.18 9.27 5975315.79 615992.76 N 70.34134093 W 149.05866223
10221.64 90.63 179.42 4958.25 5020.07 5863.11 12129.67 6029.99 -5219.45 -3019.62 2.68 5975283.56 615993.84 N 70.34125285 W 149.05865756
10253.50 90.45 179.24 4957.95 5019.77 5893.55 12161.53 6057.40 -5251.31 -3019.25 0.80 5975251.72 615994.72 N 70.34116582 W 149.05865443
10285.28 89.60 179.73 4957.93 5019.75 5923.93 12193.31 6084.83 -5283.09 -3018.96 3.09 5975219.95 615995.51 N 70.34107900 W 149.05865201
10317.76 91.52 178.84 4957.62 5019.44 5954.94 12225.79 6112.84 -5315.56 -3018.55 6.52 5975187.49 615996.43 N 70.34099029 W 149.05864862
10349.79 92.13 177.80 4956.60 5018.42 5985.35 12257.80 6140.23 -5347.56 -3017.62 3.76 5975155.51 615997.87 N 70.34090287 W 149.05864090
10382.06 93.00 177.66 4955.15 5016.97 6015.87 12290.04 6167.68 -5379.77 -3016.34 2.73 5975123.33 615999.66 N 70.34081487 W 149.05863043
10413.94 93.72 177.58 4953.28 5015.10 6045.97 12321.86 6194.79 -5411.57 -3015.02 2.27 5975091.56 616001.49 N 70.34072800 W 149.05861960
10445.71 93.27 175.93 4951.35 5013.17 6075.81 12353.58 6221.59 -5443.23 -3013.22 5.37 5975059.93 616003.78 N 70.34064151 W 149.0.3
10478.05 92.27 176.21 4949.78 5011.60 6106.07 12385.88 6248.74 -5475.45 -3011.01 3.21 5975027.75 616006.51 N 70.34055348 W 149.0 86
10509.70 93.03 175.99 4948.32 5010.14 6135.70 12417.49 6275.37 -5507.00 -3008.86 2.50 5974996.25 616009.16 N 70.34046731 W 149.05856931
10541.40 93.44 172.58 4946.53 5008.35 6164.99 12449.14 6301.51 -5538.48 -3005.71 10.82 5974964.82 616012.81 N 70.34038129 W 149.05854364
10573.64 92.00 172.24 4945.00 5006.82 6194.37 12481.34 6327.57 -5570.40 -3001 .45 4.59 5974932.97 616017.57 N 70.34029409 W 149.05850903
10606.07 90.35 168.91 4944.34 5006.16 6223.52 12513.77 6353.23 -5602.38 -2996.14 11.46 5974901.08 616023.38 N70.34020673 W 149.05846585
10638.53 90.73 168.04 4944.03 5005.85 6252.16 12546.23 6378.25 -5634.19 -2989.66 2.92 5974869.39 616030.37 N 70.34011985 W 149.05841312
10669.63 90.15 165.44 4943.79 5005.61 6279.15 12577.32 6401.68 -5664.45 -2982.53 8.57 5974839.24 616037.98 N 70.34003717 W 149.05835515
10702.49 89.01 165.78 4944.03 5005.85 6307.33 12610.18 6426.08 -5696.28 -2974.36 3.62 5974807.55 616046.65 N 70.33995023 W 149.05828879
10734.65 89.77 162.17 4944.38 5006.20 6334.43 12642.34 6449.40 -5727.19 -2965.48 11.47 5974776.79 616056.02 N 70.33986582 W 149.05821667
10765.02 89.36 161.08 4944.61 5006.43 6359.33 12672.71 6470.63 -5756.01 -2955.91 3.83 5974748.13 616066.05 N 70.33978709 W 149.05813891
10797.46 89.63 157.51 4944.89 5006.71 6385.15 12705.15 6492.42 -5786.34 -2944.44 11.04 5974717.98 616077.99 N 70.33970422 W 149.05804577
10829.78 90.49 154.82 4944.86 5006.68 6409.77 12737.47 6512.89 -5815.91 -2931.39 8.74 5974688.63 616091.52 N 70.33962348 W 149.05793971
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 )
S-213\S-213\S-213AL3\S-213AL3
Generated 3/7/2005 1 :01 PM Page 6 of 8
Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude
Depth Section Departure
(II) ( deg) (deg) (II) (II) (II) (II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS)
10861.91 90.39 153.38 4944.61 5006.43 6433.48 12769.60 6532.43 -5844.81 -2917.35 4.49 5974659.96 616106.01 N 70.33954454 W 149.05782576
10894.01 90.28 151.27 4944.42 5006.24 6456.49 12801.70 6551.26 -5873.23 -2902.44 6.58 5974631.78 616121.36 N 70.33946690 W 149.05770471
1 0925.48 89.12 149.56 4944.59 5006.41 6478.30 12833.17 6568.96 -5900.60 -2886.91 6.57 5974604.67 616137.33 N 70.33939215 W 149.05757857
10957.21 89.49 148.70 4944.97 5006.79 6499.77 12864.89 6586.32 -5927.83 -2870.63 2.95 5974577.70 616154.04 N 70.33931778 W 149.05744640
10989.97 89.32 146.52 4945.31 5007.13 6521.29 12897.65 6603.63 -5955.49 -2853.08 6.67 5974550.32 616172.02 N 70.33924223 W 149.05730395
11019.59 89.08 144.67 4945.73 5007.55 6539.95 12927.27 6618.49 -5979.92 -2836.35 6.30 5974526.16 616189.14 N 70.33917549 W 149.05716810
11051.23 89.39 141.88 4946.15 5007.97 6558.87 12958.91 6633.35 -6005.28 -2817.43 8.87 5974501.11 616208.45 N 70.33910624 W 149.05701454
11083.64 89.05 140.71 4946.59 5008.41 6577.34 12991.31 6647.70 -6030.57 -2797.17 3.76 5974476.15 616229.12 N 70.33903718 W 149.05685006
11116.05 89.15 141.09 4947.10 5008.92 6595.63 13023.72 6661.98 -6055.72 -2776.73 1.21 5974451.33 616249.95 N 70.33896850 W 149.05668416
11147.47 88.94 141.81 4947.62 5009.44 6613.61 13055.13 6676.21 -6080.29 -2757.15 2.39 5974427.08 616269.91 N 70.33890140 W 149.05652524
11179.62 89.36 142.04 4948.10 5009.92 6632.23 13087.28 6691.13 -6105.59 -2737.33 1.49 5974402.09 616290.13 N 70.33883228 W 149.0.2
11211.74 89.53 140.06 4948.41 5010.23 6650.42 13119.40 6705.72 -6130.57 -2717.14 6.19 5974377.44 616310.72 N 70.33876407 W 149.0 4
11243.62 90.73 140.52 4948.34 5010.16 6668.13 13151.28 6719.95 -6155.09 -2696.77 4.03 5974353.24 616331.47 N 70.33869709 W 149.056 12
11275.24 90.32 141.67 4948.05 5009.87 6686.07 13182.90 6734.58 -6179.70 -2676.91 3.86 5974328.96 616351.71 N 70.33862989 W 149.05587394
11307.10 89.84 140.09 4948.00 5009.82 6704.04 13214.76 6749.33 -6204.41 -2656.81 5.18 5974304.57 616372.20 N 70.33856239 W 149.05571078
11339.34 89.43 139.15 4948.21 5010.03 6721.63 13247.00 6763.74 -6228.97 -2635.93 3.18 5974280.34 616393.47 N 70.33849531 W 149.05554125
11371.68 89.22 136.38 4948.59 5010.41 6738.40 13279.33 6777.38 -6252.91 -2614.19 8.59 5974256.75 616415.58 N 70.33842993 W 149.05536485
11403.79 89.56 134.96 4948.93 5010.75 6754.03 13311.44 6789.98 -6275.88 -2591.75 4.55 5974234.15 616438.38 N 70.33836721 W 149.05518275
11436.18 89.49 137.69 4949.20 5011.02 6770.11 13343.83 6803.16 -6299.30 -2569.39 8.43 5974211.08 616461.11 N 70.33830324 W 149.05500124
11467.84 89.67 136.40 4949.43 5011.25 6786.18 13375.49 6816.53 -6322.48 -2547.82 4.11 5974188.26 616483.05 N 70.33823996 W 149.05482615
11499.81 89.84 136.71 4949.57 5011.39 6802.18 13407.46 6829.90 -6345.69 -2525.83 1.11 5974165.40 616505.39 N 70.33817657 W 149.05464773
11532.04 89.01 134.77 4949.89 5011.71 6817.90 13439.69 6843.09 -6368.77 -2503.34 6.55 5974142.68 616528.25 N 70.33811354 W 149.05446519
11565.07 89.18 132.75 4950.42 5012.24 6833.00 13472.71 6855.69 -6391.61 -2479.49 6.14 5974120.23 616552.46 N 70.33805116 W 149.05427161
11596.70 88.81 127.50 4950.97 5012.79 6845.65 13504.34 6866.01 -6411.98 -2455.32 16.64 5974100.24 616576.95 N 70.33799552 W 149.05407544
11628.70 88.33 127.50 4951.77 5013.59 6857.10 13536.33 6875.19 -6431.46 -2429.94 1.50 5974081.17 616602.63 N 70.33794234 W 149.05386949
11660.96 89.97 129.75 4952.25 5014.07 6869.22 13568.58 6885.18 -6451.59 -2404.74 8.63 5974061.45 616628.14 N 70.33788736 W 149.05366500
11692.22 88.84 126.53 4952.57 5014.39 6880.73 13599.84 6894.75 -6470.89 -2380.16 10.92 5974042.54 616653.03 N 70.33783465 W 149.05346553
11724.49 89.12 127.73 4953.15 5014.97 6892.07 13632.11 6904.22 -6490.37 -2354.43 3.82 5974023.47 616679.05 N 70.33778147 W 149.05325678
11755.64 89.05 126.39 4953.64 5015.46 6902.99 13663.25 6913.45 -6509.14 -2329.58 4.31 5974005.10 616704.20 N 70.33773021 W 149.0.10
11787.14 89.63 126.40 4954.01 5015.83 6913.69 13694.75 6922.57 -6527.82 -2304.23 1.84 5973986.82 616729.84 N 70.33767918 W 149.0 36
11819.48 90.49 127.32 4953.97 5015.79 6924.92 13727.09 6932.32 -6547.22 -2278.35 3.89 5973967.84 616756.02 N 70.33762620 W 149.05263938
11852.10 90.21 127.87 4953.77 5015.59 6936.64 13759.71 6942.69 -6567.12 -2252.51 1.89 5973948.35 616782.18 N 70.33757186 W 149.05242966
11883.63 89.19 130.64 4953.94 5015.76 6948.81 13791.24 6953.70 -6587.07 -2228.09 9.36 5973928.79 616806.90 N 70.33751738 W 149.05223156
11915.13 90.21 133.62 4954.10 5015.92 6962.42 13822.74 6966.29 -6608.20 -2204.74 10.00 5973908.04 616830.59 N 70.33745968 W 149.05204201
11947.79 91.18 134.07 4953.71 5015.53 6977.40 13855.40 6980.36 -6630.82 -2181.18 3.27 5973885.80 616854.50 N 70.33739790 W 149.05185087
11979.40 90.18 137.23 4953.33 5015.15 6992.77 13887.00 6994.98 -6653.42 -2159.09 10.48 5973863.55 616876.94 N 70.33733617 W 149.05167159
Last MWD+IFR+MS 11997.05 90.01 137.90 4953.30 5015.12 7001 .87 13904.65 7003.71 -6666.45 -2147.18 3.92 5973850.72 616889.06 N 70.33730060 W 149.05157494
TD (Projected lAB) 12054.00 88.97 137.90 4953.81 5015.63 7031.50 13961.60 7032.39 -6708.70 -2109.00 1.83 5973809.08 616927.90 N 70.33718520 W 149.05126511
Survey Type: Definitive Survey
NOTES: MWD + IFR : AK - ( MWD + IFR [Alaska] -- In-field referenced MWD in Alaska. Model takes account of increased violence of magnetic field disturbances in Alaska.
Assumes a BHA sag correction is applied to enhance inclination accuracy. )
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 )
S-213\S-213\S-213AL3\S-213AL3
Generated 3/7/2005 1 :01 PM Page 7 of 8
I M~eS~~ed I Inclination I Azimuth I Sub-Sea TVD I TVD I ~:~~:~ I ~~~~:u~~ I Closure INS EW I DLS I
(II) (deg) (deg) (It) (II) (II) (II) (II) (II) (II) (deg/1001l)
MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is applied to enhance inclination accuracy. )
Comments
Leqal Description:
Surface: 4346 FSL 4500 FEL S35 T12N R12E UM
Tie-In: 4346 FSL 4500 FEL S35 T12N R12E UM
BHL: 2917 FSL 1337 FEL S3 T11 N R12E UM
Northinq ey) rftUSl
5980549.84
5980549.89
5973809.48
SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 )
Eastinq eX) rttUSl
618929.96
618929.86
616928.48
S-213\S-213\S-213AL3\S-213AL3
Northing
(IIUS)
Easting
Latitude
Longitude
(IIUS)
.
.
Generated 3/7/2005 1 :01 PM Page 8 of 8
~
SCHLUMBERGER
Survey report
Client. ....... ......... ..: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . _ .: Polaris
Well. . . . . . . . . . . . . . . . . . . . .: S-213AL3
API number...............: 50-029-22993-63
Engineer.................: S. Moy
RIG..... .................: Doyon 16
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.. ...: Minimum curvature
Method for DLS.... ...._ ..: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Driller's Depth
GL above permanent.......: 35.90 ft
KB above permanent.......: N/A Top Drive
DF above permanent..... ..: 61.82 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from rotary table to target: 237.4 degrees
[(c)2005 IDEAL ID8_1C_02]
8-Feb-2005 18:32:02
Spud date................:
Last survey date. . . . . . . . . :
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
Page
1 of 10
23-Nov-04
08-Feb-05
265
0.00 ft
12160.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model..... ......: BGGM version 2004
Magnetic date............: 15-Dec-2004
Magnetic field strength..: 1152.25 HCNT
Magnetic dec (+E/W-).....: 24.81 degrees
Magnetic dip.............: 80.85 degrees
----- MWD survey Reference
Reference G..............:
Reference H.. ............:
Reference Dip. ...........:
Tolerance of G...........:
Tolerance of H...........:
Tolerance of Dip.........:
Criteria ---------
1002.68 mGal
1152.25 HCNT
80.85 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
.
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 24.81 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 24.81 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
:20v(-~/7
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
Page
2 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
1
2
3
4
5
0.00
155.42
233.49
327.03
415.75
6
7
8
9
10
509.99
602.31
694.94
787.96
883.26
11
12
13
14
15
976.53
1069.16
1160.63
1253.35
1347.39
16
17
18
19
20
1439.53
1534.40
1630.00
1723.15
1814.13
21
22
23
24
25
1863.71
1907.37
2000.61
2095.16
2187.42
26
27
28
29
30
2282.02
2375.30
2469.73
2503.22
2532.82
0.00
0.08
0.19
0.28
0.46
0.27
0.35
0.40
0.15
0.36
0.43
0.53
0.56
0.77
1. 25
1. 80
1. 41
0.74
2.46
6.28
6.40
6.39
6.09
5.63
5.36
5.13
7.07
12.17
14.39
15.76
297.52
297.52
189.70
217.18
188.45
140.23
136.82
110.75
142.58
98.80
98.44
98.28
78.60
70.45
70.29
76.02
74.91
66.98
259.23
254.60
256.71
253.07
240.31
239.01
237.61
235.24
239.64
244.54
244.19
243.38
[(c)2005 IDEAL ID8_1C_02]
0.00
155.42
78.07
93.54
88.72
94.24
92.32
92.63
93.02
95.30
93.27
92.63
91.47
92.72
94.04
92.14
94.87
95.60
93.15
90.98
49.58
43.66
93.24
94.55
92.26
94.60
93.28
94.43
33.49
29.60
0.00
155.42
233.49
327.03
415.75
509.99
602.30
694.93
787.95
883.25
976.52
1069.14
1160.61
1253.32
1347.35
1439.46
1534.29
1629.87
1723.00
1813 .70
1862.97
1906.36
1999.05
2093.11
2184.95
2279.15
2371.90
2464.97
2497.56
2526.14
0.06
0.11
0.23
0.54
0.98
1. 20
1.12
0.88
0.67
0.44
-0.04
-0.63
-1.37
-2.40
-4.01
-6.36
-8.89
-10.62
-9.36
-2.79
2.41
7.05
16.98
26.63
35.46
44.11
54.01
69.70
77.34
84.99
0.05
0.10
-0.00
-0.34
-0.86
-1. 41
-1. 78
-2.10
-2.31
-2.46
-2.55
-2.67
-2.64
-2.34
-1. 78
-1. 09
-0.43
0.12
-0.02
-1. 71
-3.06
-4.33
-8.29
-13 .16
-17.80
-22.58
-27.86
-35.08
-38.41
-41. 81
-0.10
-0.20
-0.27
-0.43
-0.61
-0.53
-0.20
0.30
0.68
1. 05
1. 69
2.45
3.31
4.34
5.90
8.25
10.83
12.53
11.12
4.40
-0.90
-5.60
-14.86
-23.19
-30.71
-37.91
-46.29
-60.30
-67.24
-74.14
0.11
0.22
0.27
0.55
1. 06
1. 50
1. 79
2.12
2.41
2.67
3.06
3.62
4.23
4.93
6.17
8.33
10.83
12.53
11.12
4.72
3.19
7.08
17.01
26.66
35.49
44.13
54.03
69.77
77.44
85.12
296.57
297.04
269_51
231.93
215.45
200.55
186.27
171.86
163.66
156.87
146.57
137.38
128.56
118.33
106.81
97.56
92.28
89.47
90.11
111. 22
196.41
232.26
240.83
240.42
239.90
239.22
238.96
239.81
240.26
240.58
DLS
(deg/
100f)
0.00
0.05
0.29
0.15
0.29
0.37
0.09
0.19
0.31
0.29
0.08
0.11
0.21
0.25
0.51
0.62
0.41
0.72
3.42
4.21
0.53
0.93
1. 52
0.51
0.33
0.33
2.14
5.47
6.63
4.68
------
------
Srvy Tool
tool Corr
type (deg)
------
------
TIP None
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
.
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
.
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Page
3 of 10
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
31
32
33
34
35
2562.81
2591.90
2628.07
2655.84
2686.92
36
37
38
39
40
2718.71
2749.91
2798.38
2856.54
2909.66
41
42
43
44
45
3006.92
3102.80
3199.21
3295.21
3392.93
46
47
48
49
50
3488.29
3584.58
3680.92
3776.78
3873.18
51
52
53
54
55
3968.74
4064.79
4160.95
4257.35
4348.86
56
57
58
59
60
4446.91
4545.83
4641. 52
4737.67
4831.97
17.56
19.43
19.93
20.53
21. 45
22.14
23.21
24.47
26.47
29.58
33.61
37.72
41.06
43.34
45.61
44.79
45.23
44.69
45.06
44.60
44.05
43.64
43.86
43.42
43.94
43.12
44.42
44.65
43.99
43.63
242.48
241.38
240.84
241. 04
241.15
240.27
238.46
236.38
236.45
236.00
231.80
227.46
226.91
232.11
237.12
237.13
235.98
235.88
236.81
236.48
237.25
237.36
238.30
238.37
237.59
237.35
236.52
236.80
236.28
236.15
[(c)2005 IDEAL ID8_1C_02]
29.99
29.09
36.17
27.77
31.08
31.79
31.20
48.47
58.16
53.12
97.26
95.88
96.41
96.00
97.72
95.36
96.29
96.34
95.86
96.40
95.56
96.05
96.16
96.40
91. 51
98.05
98.92
95.69
96.15
94.30
2554.87
2582.46
2616.52
2642.57
2671.59
2701.11
2729.90
2774.23
2826.74
2873.62
2956.46
3034.35
3108.85
3179.99
3249.73
3316.92
3385.00
3453.17
3521.10
3589.47
3657.83
3727.11
3796.57
3866.33
3932.51
4003.60
4075.03
4143.24
4212.03
4280.08
93.55
102.75
114.90
124.49
135.60
147.38
159.40
178.99
203.99
228.94
279.76
335.09
395.29
459.12
527.46
595.12
663.21
731.27
798.89
866.84
933.61
1000.14
1066.64
1133.16
1196.35
1263.88
1332.31
1399.41
1466.58
1531.85
-45.73
-50.08
-55.96
-60.62
-66.01
-71.78
-77.91
-88.47
-102.30
-116.18
-146.27
-182.53
-224.11
-265.90
-305.47
-342.20
-379.73
-417.86
-455.34
-492.71
-529.21
-565.15
-600.55
-635.48
-668.99
-81.80
-89.94
-100.60
-109.00
-118.74
-129.03
-139.38
-155.88
-176.72
-197.46
-238.53
-281.02
-325.89
-374.94
-430.75
-487.57
-544.39
-600.78
-657.08
-713.85
-769.76
-825.75
-882.04
-938.66
-992.25
-705.30 -1049.18
-742.64 -1106.52
-779.52 -1162.59
-816.56 -1218.63
-852.86 -1272.89
93.71
102.94
115.12
124.72
135.85
147.66
159.68
179.24
204.19
229.10
279.81
335.10
395.51
459.65
528.07
595.67
663.75
731.81
799.44
867.38
934.13
1000.63
1067.08
1133.54
1196.70
1264.21
1332.63
1399.74
1466.91
1532.19
240.79
240.89
240.91
240.92
240.93
240.91
240.80
240.42
239.93
239.53
238.48
237.00
235.48
234.66
234.66
234.94
235.10
235.18
235.28
235.39
235.49
235.61
235.75
235.90
236.01
236.09
236.13
236.16
236.18
236.18
DLS
(deg/
100f)
6.06
6.54
1. 47
2.17
2.96
2.40
4.09
3.12
3.44
5.87
4.72
5.03
3.48
4.34
4.28
0.86
0.96
0.57
0.79
0.53
0.81
0.43
0.71
0.46
0.82
0.85
1. 44
0.32
0.78
0.39
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_IFR_AK
MWD_Inc_Only
.
MWD_Inc_Only
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
Page
4 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seg Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
61
62
63
64
65
4928.03
5023.20
5119.83
5216.82
5313.24
66
67
68
69
70
5409.71
5505.37
5602.48
5697.64
5793.44
71
72
73
74
75
5889.06
5985.53
5986.00
5998.00
6018.00
76
77
78
79
80
6030.60
6062.70
6095.09
6127.29
6159.01
81
82
83
84
85
6190.06
6223.38
6255.40
6286.40
6318.97
86
87
88
89
90
6351.27
6383.58
6412.88
6444.10
6475.29
44.71
44.27
43.93
44.04
44.17
43.74
45.59
48.31
51.38
54.39
57.95
61. 01
61. 03
62.87
64.64
65.79
68.58
71. 86
75.13
78 .46
82.53
85.48
87.88
91.35
95.16
97.51
98.93
98.90
101. 02
102.53
235.59
235.98
235.90
234.58
235.63
235.73
235.49
234.89
233.90
235.09
233.06
230.89
230.88
230.25
230.75
231.08
231.90
232.70
233.47
234.20
234.90
235.64
239.04
238.00
237.00
237.39
236.29
234.95
232.34
230.73
[(c)2005 IDEAL ID8_1C_02]
96.06
95.17
96.63
96.99
96.42
96.47
95.66
97.11
95.16
95.80
95.62
96.47
0.47
12.00
20.00
12.60
32.10
32.39
32.20
31.72
31.05
33.32
32.02
31.00
32.57
32.30
32.31
29.30
31. 22
31.19
4348.98
4416.87
4486.27
4556.05
4625.29
4694.74
4762.77
4829.06
4890.42
4948.22
5001.45
5050.44
5050.66
5056.31
5065.15
5070.43
5082.88
5093.84
5102.99
5110.23
5115.36
5118.84
5120.69
5120.90
5119.05
5115.49
5110.87
5106.33
5100.93
5094.56
1598.75
1665.42
1732.64
1799.95
1867.00
1933.93
2001.14
2072.04
2144.66
2220.95
2300.22
2382.94
2383.34
2393.86
2411.67
-890.42
-927.92
-965.58
-1003.98
-1042.37
-1080.12
-1118.10
-1158.62
-1200.97
-1245.31
-1291.93
-1343.13
-1343.39
-1350.12
-1361.53
-1328.29
-1383.44
-1439.15
-1494.49
-1549.53
-1604.83
-1660.32
-1718.57
-1777.69
-1839.88
-1904.17
-1969.60
-1969.92
-1978.10
-1991.94
2423.03 -1368.74 -2000.82
2452.46 -1387.16 -2023.97
2482.81 -1405.79 -2048.08
2513.60 -1424.33 -2072.77
2544.41 -1442.55 -2097.69
2574.99 -1460.31 -2122.64
2608.10 -1479.19 -2149.87
2640.06 -1496.43 -2176.77
2671.05 -1512.62 -2203.21
2703.56 -1530.08 -2230.63
2735.66 -1547.48 -2257.61
2767.64 -1564.97 -2284.38
2796.57 -1581.31 -2308.27
2827.25 -1599.53 -2333.03
2857.62 -1618.53 -2356.94
1599.13
1665.82
1733.06
1800.41
1867.50
1934.46
2001. 70
2072.65
2145.34
2221.70
2301.07
2383.97
2384.38
2394.93
2412.80
2424.20
2453.71
2484.13
2514.97
2545.84
2576.45
2609.58
2641. 53
2672.48
2704.97
2737.06
2769.02
2797.97
2828.70
2859.15
236.16
236.15
236.14
236.11
236.07
236.06
236.04
236.01
235.96
235.91
235.84
235.71
235.71
235.69
235.65
235.62
235.57
235.53
235.50
235.48
235.47
235.47
235.49
235.53
235.55
235.57
235.59
235.59
235.57
235.52
DLS
(degl
100f)
1. 20
0.54
0.36
0.95
0.77
0.45
1.94
2.84
3.32
3.29
4.12
3.72
4_64
16.02
9.13
9.43
9.00
10.39
10_41
10.73
13.29
9.12
12.98
11. 69
12.09
7.37
5.54
4.52
10.67
7.00
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
BP_BLIND_TOW
BP_BLIND_BOW
BP_BLIND_Rat
Hole
BP_BLIND_IAB_Inc
BP_BLIND_IAB_Inc
BP_BLIND_IAB_Inc
BP_BLIND_IAB_Inc
BP_BLIND_IAB_Inc
BP_BLIND_IAB_Inc 4IÞ
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Page
5 of 10
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
91
92
93
94
95
6506.77
6539.29
6570.44
6603.19
6634.08
96
97
98
99
100
6666.97
6698.95
6730.26
6762.91
6794.38
101
102
103
104
105
6826.92
6858.92
6891.33
6922.88
6955.16
106
107
108
109
110
6987.42
7018.49
7049.51
7083.30
7115.23
111
112
113
114
115
7145.60
7178.37
7211.12
7242.53
7275.05
116
117
118
119
120
7306.26
7339.21
7370.55
7402.53
7434.94
102.28
102.17
100.46
96.95
93.54
91. 76
92.10
91. 76
92.58
92.89
93.65
93.61
93.41
94.54
94.99
93.17
92.38
92.69
92.79
92.24
90.45
90.45
91.83
91. 62
91.11
91.17
92.62
92.13
91. 79
91.14
227.24
224.73
223.89
224.02
224.09
222.39
219.09
215.60
212.20
209.60
208.96
207.08
208.34
206.99
203.45
200.50
199.46
198.50
199.95
197.89
197.04
197_16
197.29
197.52
198.27
197.63
197.30
197.80
198.24
197.96
[(c)2005 IDEAL ID8_1C_02]
31. 48
32.52
31.15
32.75
30.89
32.89
31.98
31.31
32_65
31.47
32.54
32.00
32.41
31. 55
32.28
32.26
31. 07
31.02
33.79
31.93
30.37
32.77
32.75
31. 41
32.52
31.21
32.95
31. 34
31.98
32.41
5087.80
5080.91
5074.80
5069.84
5067.02
5065.50
5064.42
5063.37
5062.13
5060.63
5058.77
5056.74
5054_76
5052.57
5049.89
5047.60
5046.09
5044.72
5043.10
5041.70
5040.99
5040.73
5040.08
5039.14
5038.36
5037.74
5036.65
5035.35
5034.26
5033.43
2888.03 -1638.70 -2380.13
2919.18 -1660.78 -2402.98
2948.93 -1682.64 -2424.32
2980.41 -1705.94 -2446.78
3010.34 -1728.04 -2468.17
3042.19 -1751.97 -2490.68
3072.81 -1776.19 -2511.53
3102.20 -1801.06 -2530.51
3132.11 -1828.14 -2548.71
3160.24 -1855.11 -2564.85
3188.89 -1883.44 -2580.74
3216.72 -1911.63 -2595.74
3244.82 -1940.27 -2610.78
3272.15 -1968.15 -2625.39
3299.37 -1997.25 -2639.10
3325.59 -2027.08 -2651.14
3350.24 -2056.25 -2661.74
3374.52 -2085.55 -2671.82
3401.05 -2117.42 -2682.93
3426.02 -2147.59 -2693.28
3449.30 -2176.55 -2702.39
3474.29 -2207.87 -2712.02
3499.31 -2239.15 -2721.72
3523.36 -2269.11 -2731.11
3548.44 -2300.04 -2741.10
3572.54 -2329.73 -2750.72
3597.79 -2361.14 -2760.60
3621.83 -2391.00 -2770.04
3646.53 -2421.39 -2779.93
3671.60 -2452.19 -2790.00
2889.70
2921.05
2951.03
2982.78
3012.97
3045.14
3076.14
3106.01
3136.56
3165.42
3194.93
3223.70
3252.82
3281.20
3309.66
3337.30
3363.48
3389.42
3417.84
3444.69
3469.91
3497.11
3524.42
3550.75
3578.24
3604.73
3632.62
3659.24
3686.62
3714.47
235.45
235.35
235.24
235.12
235.00
234.88
234.73
234.56
234.35
234.12
233.88
233.63
233.38
233.14
232.88
232.60
232.31
232.03
231.72
231.43
231.15
230.85
230.56
230.28
230.00
229.74
229.46
229.20
228.94
228.69
DLS
(deg/
100f)
10.86
7.55
6.09
10.72
11.04
7.48
10.37
11.19
10.70
8.31
3.05
5.86
3.93
5.57
11. 02
10.72
4.20
3.25
4.30
6.67
6.52
0.37
4.23
0.99
2.79
2.06
4.51
2.23
1. 74
2.18
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Page
6 of 10
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
121
122
123
124
125
7467.15
7499.01
7530.39
7563.37
7595.14
126
127
128
129
130
7627.17
7659.32
7691.11
7723.25
7754.76
131
132
133
134
135
7786.82
7817.87
7851.72
7882.85
7914.40
136
137
138
139
140
7947.02
7978.59
8011.01
8042.99
8075.08
141
142
143
144
145
8105.69
8137.82
8170.02
8202.34
8234.10
146
147
148
149
150
8265.84
8298.57
8331. 02
8362.47
8392.11
91. 83
92.17
91. 93
91. 86
91. 55
91.38
91. 42
91. 31
92.72
92.96
92.96
92.79
93.37
94.03
93.10
91. 86
91. 76
91.62
91.89
92.21
92.03
92.17
92.58
93.34
93.16
92.75
92.68
91. 93
90.90
90.69
197.39
196.83
196.82
197.03
195.43
192.34
190.84
189.38
188.19
189.42
188.83
188.46
187.99
186.04
186.19
185.18
185.06
185.13
186.02
184.77
185.61
184.80
183.92
184.85
184.86
184.58
185.47
185.31
185.74
185.60
[(c)2005 IDEAL ID8_1C_02]
32.21
31.86
31.38
32.98
31. 77
32.03
32.15
31. 79
32.14
31.51
32.06
31. 05
33.85
31.13
31.55
32.62
31. 57
32.42
31. 98
32.09
30.61
32.13
32.20
32.32
31.76
31. 74
32.73
32.45
31. 45
29.64
5032.59
5031.48
5030.36
5029.27
5028.32
5027.50
5026.72
5025.96
5024.83
5023.27
5021.61
5020.06
5018.24
5016.23
5014.27
5012.86
5011.86
5010.90
5009.92
5008.77
5007.64
5006.47
5005.13
5003.46
5001.66
5000.02
4998.47
4997.17
4996.39
4995.98
3696.37 -2482.87 -2799.77
3720.66 -2513.30 -2809.14
3744.48 -2543.31 -2818.22
3769.55 -2574.85 -2827.81
3793.45 -2605.34 -2836.69
3816.67 -2636.42 -2844.37
3839.07 -2667.90 -2850.83
3860.63 -2699.19 -2856.41
3881.86 -2730.93 -2861.31
3902.68 -2762.03 -2866.13
3923.99 -2793.64 -2871.21
3944.43 -2824.30 -2875.87
3966.53 -2857.75 -2880.70
3986.34 -2888.59 -2884.50
4006.03 -2919.89 -2887.85
4026.22 -2952.32 -2891.08
4045.53 -2983.75 -2893.90
4065.34 -3016.03 -2896.77
4085.10 -3047.84 -2899.88
4104.84 -3079.77 -2902.89
4123.58 -3110.23 -2905.66
4143.27 -3142.21 -2908.57
4162.61 -3174.29 -2911.02
4182.03 -3206.47 -2913.49
4201.31 -3238.06 -2916.17
4220.53 -3269.65 -2918.78
4240.49 -3302.22 -2921.64
4260.44 -3334.50 -2924.69
4279.85 -3365.79 -2927.72
4298.21 -3395.29 -2930.64
3742.10
3769.34
3796.15
3824.44
3851. 57
3878.29
3904.47
3929.97
3955.39
3980.39
4006.03
4030.79
4057.73
4082.19
4106.76
4132.14
4156.61
4181. 83
4206.98
4232_23
4256.34
4281.74
4306.99
4332.42
4357.65
4382.91
4409.16
4435.39
4460.95
4485.16
228.43
228.18
227.94
227.68
227.43
227.17
226.90
226.62
226.34
226.06
225.78
225.52
225.23
224.96
224.68
224.40
224.12
223.84
223.57
223.31
223.05
222.79
222.52
222.26
222.01
221.75
221.50
221.25
221. 02
220.80
DLS
(deg/
100f)
2.78
2.06
0.77
0.67
5.13
9.66
4.67
4.60
5.74
3.97
1. 84
1. 31
2.20
6_60
2.99
4.90
0.49
0.48
2.91
4.02
2.80
2.56
3.01
3.71
0.57
1. 56
2.72
2.36
3.55
0.85
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Page
7 of 10
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
151
152
153
154
155
8426.07
8457.74
8489.94
8522.27
8553.98
156
157
158
159
160
8585.92
8618.19
8650.24
8681.44
8714.76
161
162
163
164
165
8746.52
8777.94
8810.51
8842.28
8874.56
166
167
168
169
170
8906.71
8938.36
8970.53
9002.92
9034.75
171
172
173
174
175
9067.16
9098.87
9130.46
9162.47
9194.37
176
177
178
179
180
9226.50
9259.04
9290.23
9320.60
9351.69
90.18
90.56
91.38
91.38
91.14
90.80
90.93
90.97
90.11
89.32
89.22
89.05
89.08
87.68
86.54
86.16
85.96
85.92
86.16
86.95
86.61
87.37
88.91
88.57
88.98
89.22
88.98
91.14
91.35
91. 00
186.03
184.20
182.83
184.76
183.57
182.59
182.86
181.85
182.73
184.61
185.21
182.79
183.36
183.15
187.77
186.84
185.42
186.33
186.38
187.90
188.44
188.49
188.29
189.25
188.00
186.95
184.01
183.53
182.37
181. 44
[(c)2005 IDEAL ID8_1C_02]
33.96
31.67
32.20
32.33
31. 71
31. 94
32_27
32.05
31. 20
33.32
31.76
31. 42
32.57
31.77
32.28
32.15
31.65
32.17
32.39
31.83
32.41
31. 71
31. 59
32.01
31. 90
32.13
32.54
31. 19
30.37
31. 09
4995.72
4995.52
4994.97
4994.20
4993.50
4992.96
4992.47
4991. 94
4991.65
4991.81
4992.22
4992.69
4993.22
4994.12
4995.75
4997.79
4999.97
5002.25
5004.48
5006.40
5008.22
5009.88
5010.91
5011.61
5012.29
5012.80
5013.31
5013.28
5012.62
5011.98
4319.31 -3429.07 -2934.08
4338.68 -3460.61 -2936.91
4357.66 -3492.75 -2938.88
4376.83 -3524.99 -2941.02
4395.81 -3556.61 -2943.32
4414.44 -3588.50 -2945.04
4433.09 -3620.73 -2946.57
4451.45 -3652.75 -2947.89
4469.30 -3683.92 -2949.14
4489.01 -3717.17 -2951.27
4508.34 -3748.81 -2953.99
4527.08 -3780.15 -2956.18
4546.07 -3812.67 -2957.92
4564.67 -3844.37 -2959.73
4584.54 -3876.46 -2962.79
4605.12 -3908.28 -2966.87
4624.87 -3939.68 -2970.25
4644.84 -3971.60 -2973.53
4665.15 -4003.71 -2977.11
4685.47 -4035.24 -2981.06
4706.60 -4067.27 -2985.65
4727.40 -4098.59 -2990.32
4748.11 -4129.82 -2994.92
4769.26 -4161.45 -2999.80
4790.27 -4192.98 -3004.58
4810.96 -4224.83 -3008.76
4831.02 -4257.22 -3011.87
4849.52 -4288.34 -3013.92
4867.17 -4318.66 -3015.48
4884.78 -4349.73 -3016.52
4513.02
4538.86
4564.68
4590.77
4616.56
4642.26
4668.19
4693.89
4718.97
4746.30
4772.80
4798.81
4825.53
4851.72
4879.04
4906.83
4933.90
4961.40
4989.27
5016.95
5045.47
5073.50
5101.47
5129.96
5158.35
5186.70
5214.91
5241.52
5267.25
5293.34
220.55
220.32
220.08
219.84
219.61
219.38
219.14
218.90
218.68
218.45
218.24
218.03
217.80
217.59
217.39
217 .20
217 . 01
216.82
216.63
216.46
216.28
216.11
215.95
215.79
215.62
215.46
215.28
215.10
214.92
214.74
DLS
(deg/
100f)
1. 96
5.90
4.96
5.97
3.83
3.25
0.93
3.15
3.94
6.12
1. 92
7.72
1. 75
4.46
14.72
3.12
4.52
2.82
0.76
5.37
1.97
2.40
4.92
3.18
4.12
3.35
9.06
7.09
3.88
3.20
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
Page
8 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
---
--------
--------
181
182
183
184
185
9382.10
9413.59
9443.16
9475.32
9505.66
186
187
188
189
190
9536.25
9566.58
9597.05
9625.82
9658.47
191
192
193
194
195
9689.03
9719.80
9752.02
9781.86
9812.78
196
197
198
199
200
9843.42
9873.85
9905.24
9935.12
9965.48
201
202
203
204
205
9996.49
10030.36
10060.46
10091.84
10125.50
206
207
208
209
210
10157.44
10189.39
10221.64
10253.50
10285.28
Incl
angle
(deg)
------
------
90.69
89.77
88.81
89.84
89.22
88.98
89.70
89.87
89.12
88.64
88.71
88.36
88.67
89.39
89.53
89.12
89.25
89.49
89.49
88.81
88.29
90.04
89.91
89.60
89.91
90.18
90.83
90.63
90.45
89.60
Azimuth
angle
(deg)
-------
-------
180.66
180.73
179.83
180.13
180.98
181.64
181. 27
181. 84
180.99
181.04
179.83
180.16
178 . 89
179.35
178.66
179.70
178.42
179.61
179.77
179.33
180_37
179.96
178.89
180.13
183.00
181.47
178.58
179.42
179.24
179.73
[(c)2005 IDEAL ID8_1C_02]
Course
length
(ft)
------
------
30.41
31. 49
29.57
32.16
30.34
30.59
30.33
30.47
28.77
32.65
30.56
30.77
32.22
29.84
30.92
30.64
30.43
31.39
29.88
30.36
31. 01
33.87
30.10
31.38
33.66
31.94
31.95
32.25
31. 86
31.78
TVD
depth
(ft)
--------
--------
5011.53
5011.40
5011.77
5012.15
5012.40
5012.88
5013 .23
5013.34
5013.60
5014.23
5014.94
5015.73
5016.56
5017.07
5017.36
5017.72
5018.15
5018.50
5018.76
5019.21
5020.00
5020.49
5020.51
5020.64
5020.78
5020.76
5020.48
5020.07
5019.77
5019.75
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
-------- ----------------
-------- ----------------
4901.63 -4380.13 -3017.07
4918.91 -4411.61 -3017.46
4934.96 -4441.18 -3017.60
4952.28 -4473.34 -3017.59
4968.87 -4503.67 -3017.88
4985.94 -4534.25 -3018.58
5002.92 -4564.57 -3019.35
5020.03 -4595.03 -3020.18
5036.12 -4623.79 -3020.89
5054.19 -4656.43 -3021.47
5070.85 -4686.98 -3021.70
5087.42 -4717.74 -3021.70
5104.54 -4749.94 -3021.43
5120.23 -4779.78 -3020.97
5136.43 -4810.69 -3020.44
5152.57 -4841.32 -3020.00
5168.54 -4871.75 -3019.50
5184.99 -4903.13 -3018.96
5200.95 -4933.01 -3018.80
5217.11 -4963.36 -3018.56
5233.74 -4994.36 -3018.48
5252.07 -5028.23 -3018.57
5268.03 -5058.33 -3018.27
5284.71 -5089.70 -3018.00
5303.61 -5123.35 -3018.92
5321.85 -5155.26 -3020.17
5339.08 -5187.21 -3020.18
5355.97 -5219.45 -3019.62
5372.82 -5251.31 -3019.25
5389.70 -5283.08 -3018.96
Total
displ
(ft)
At
Azim
(deg)
---------------
---------------
5318.67
5344.85
5369.36
5395.98
5421. 32
5447.14
5472.82
5498.71
5523.15
5550.82
5576.60
5602.47
5629.48
5654.43
5680.30
5706.03
5731.60
5758.02
5783.40
5809.19
5835.65
5864.71
5890.38
5917.21
5946.64
5974.79
6002.38
6029.99
6057.40
6084.83
214.56
214.37
214.19
214.00
213.83
213.65
213.48
213.32
213 .16
212.98
212.81
212.64
212.46
212.29
212.12
211. 96
211.79
211.62
211.46
211.31
211.15
210.98
210.82
210.67
210.51
210.36
210.21
210.05
209.90
209.75
DLS
(deg/
100f)
2.76
2.93
4.45
3.34
3.47
2.30
2.67
1.95
3.94
1. 48
3.96
1. 56
4.06
2.86
2.28
3.65
4.23
3.87
0.54
2.67
3.75
5.31
3.58
4.07
8.58
4.86
9.27
2.68
0.80
3.09
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
Page
9 of 10
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
DLS
(deg/
100f)
------
------
Srvy Tool
tool Carr
type (deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
211
212
213
214
215
10317.76
10349.79
10382.06
10413 .94
10445.71
216
217
218
219
220
10478.05
10509.70
10541.40
10573.64
10606.07
221
222
223
224
225
10638.53
10669.63
10702.49
10734.65
10765.02
226
227
228
229
230
10797.46
10829.78
10861.91
10894.01
10925.48
231
232
233
234
235
10957.21
10989.97
11019.59
11051.23
11083.64
236
237
238
239
240
11116.05
11147.47
11179.62
11211.74
11243.62
91. 52
92.13
93.00
93.72
93.27
92.27
93.03
93.44
92.00
90.35
90.73
90.15
89.01
89.77
89.36
89.63
90.49
90.39
90.28
89.12
89.49
89.32
89.08
89.39
89.05
89.15
88.94
89.36
89.53
90.73
178.84
177.80
177.66
177.58
175.93
176.21
175.99
172.58
172.24
168.91
168.04
165.44
165.78
162_17
161.08
157.51
154.82
153.38
151. 27
149.56
148.70
146.52
144.67
141.88
140.71
141.09
141.81
142.04
140.06
140.52
[(c)2005 IDEAL ID8_1C_02]
32.48
32.03
32.27
31. 88
31. 77
32.34
31.65
31.70
32.24
32.43
32.46
31.10
32.86
32.16
30.37
32.44
32.32
32.13
32.10
31.47
31.73
32.76
29.62
31.64
32.41
32.41
31. 42
32.15
32.12
31.88
5019.44
5018.42
5016.97
5015.10
5013.17
5011.60
5010.14
5008.35
5006.82
5006.15
5005.85
5005.61
5005.85
5006.19
5006.42
5006.71
5006.68
5006.43
5006.24
5006.41
5006.79
5007.13
5007.54
5007.97
5008.41
5008.92
5009.44
5009.92
5010.23
5010.16
5406.86 -5315.56 -3018.56
5423.31 -5347.56 -3017.62
5439.59 -5379.77 -3016.34
5455.61 -5411.57 -3015.02
5471.15 -5443.23 -3013.22
5486.65 -5475.45 -3011.01
5501.83 -5506.99 -3008.86
5516.14 -5538.48 -3005.71
5529.75 -5570.40 -3001.46
5542.51 -5602.38 -2996.15
5554.18 -5634.19 -2989.66
5564.48 -5664.45 -2982.53
5574.75 -5696_28 -2974.36
5583.92 -5727.18 -2965.49
5591.38 -5756.00 -2955.91
5598.07 -5786.34 -2944.45
5602.99 -5815.90 -2931.39
5606.74 -5844.80 -2917.35
5609.50 -5873.23 -2902.45
5611.15 -5900.59 -2886.91
5612.11 -5927.83 -2870.63
5612.23 -5955.49 -2853.08
5611.30 -5979.92 -2836.35
5609.02 -6005.28 -2817.43
5605.58 -6030.57 -2797.17
5601.91 -6055.71 -2776.73
5598.65 -6080.28 -2757.15
5595.58 -6105.59 -2737.33
5592.03 -6130.57 -2717.14
5588.09 -6155.09 -2696.77
6112.84
6140.23
6167.68
6194.79
6221. 59
6248.74
6275.37
6301.51
6327.57
6353.23
6378.25
6401.68
6426.08
6449.40
6470.63
6492.42
6512.89
6532.43
6551.26
6568.96
6586.32
6603.63
6618.49
6633.35
6647.70
6661.98
6676.21
6691.13
6705.72
6719.95
209.59
209.44
209.28
209.12
208.97
208.81
208.65
208.49
208.32
208.14
207.95
207.77
207.57
207.37
207.18
206.97
206.75
206.53
206.30
206.07
205.84
205.60
205.38
205.13
204.88
204.63
204.39
204.15
203.90
203.66
6.52
3.76
2.73
2.27
5.37
3.21
2.50
10.82
4.59
11. 46
2.92
8.57
3.62
11.47
3.83
11. 04
8.74
4.49
6.58
6.57
2.95
6.67
6.30
8.87
3.76
1. 21
2.39
1. 49
6.19
4.03
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD~IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
8-Feb-2005 18:32:02
Page 10 of 10
---~---- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
241
242
243
244
245
11275.24
11307.10
11339.34
11371.68
11403.79
246
247
248
249
250
11436.18
11467.84
11499.81
11532.04
11565.07
251
252
253
254
255
11596.70
11628.70
11660.96
11692.22
11724.49
256
257
258
259
260
11755.64
11787.14
11819.48
11852.10
11883.63
261
262
263
264
265
11915.13
11947.79
11979.40
11997.05
12054.00
90.32
89.84
89.43
89.22
89.56
89.49
89.67
89.84
89.01
89.18
88.81
88.33
89.97
88.84
89.12
89.05
89.63
90.49
90.21
89.19
90.21
91.18
90.18
90.01
88.97
141.67
140.09
139.15
136.38
134.96
137.69
136.40
136.71
134.77
132.75
127.50
127.50
129.75
126.53
127_73
126.39
126.40
127.32
127.87
13 0.64
133.62
134.07
137.23
137.90
137.90
[(c)2005 IDEAL ID8_1C_02]
31.62
31.86
32.24
32.34
32.11
32.39
31. 66
31.97
32.23
33.03
31.63
32.00
32.26
31. 26
32.27
31.15
31. 50
32.34
32.62
31. 53
31.50
32.66
31.61
17.65
56.95
5009.87
5009.82
5010.03
5010.41
5010.75
5011.02
5011.25
5011.39
5011.71
5012.23
5012.79
5013 .59
5014.07
5014.39
5014.97
5015.46
5015.83
5015.79
5015.59
5015.76
5015.92
5015.53
5015.15
5015.12
5015.63
5584.61 -6179.70 -2676.91
5581.00 -6204.41 -2656.81
5576.63 -6228.97 -2635.93
5571.22 -6252.91 -2614.19
5564.69 -6275.88 -2591.76
5558.47 -6299.30 -2569.39
5552.78 -6322.47 -2547.82
5546.77 -6345.68 -2525.84
5540.25 -6368.76 -2503.34
5532.47 -6391.60 -2479.49
5523.08 -6411.98 -2455.32
5512.19 -6431.45 -2429.94
5501.81 -6451.59 -2404.74
5491.50 -6470.89 -2380.16
5480.32 -6490.36 -2354.44
5469.50 -6509.13 -2329.58
5458.21 -6527.82 -2304.23
5446.86 -6547.22 -2278.35
5435.81 -6567.12 -2252.51
5425.99 -6587.07 -2228.10
5417.69 -6608.20 -2204.74
5410.04 -6630.82 -2181.19
5403.60 -6653.42 -2159.09
5400.59 -6666.45 -2147.19
5391.19 -6708.70 -2109.01
6734.58
6749.33
6763.74
6777.38
6789.98
6803.16
6816.53
6829.90
6843.09
6855.69
6866.01
6875.19
6885.18
6894.75
6904.22
6913 .45
6922.57
6932.32
6942.69
6953.70
6966.29
6980.35
6994.98
7003.71
7032.39
203.42
203.18
202.94
202.69
202.44
202.19
201.95
201.70
201.46
201.20
200.95
200.70
200.44
200.19
199.94
199.69
199.44
199.19
198.93
198.69
198.45
198.21
197.98
197.85
197.45
DLS
(deg/
100f)
3.86
5.18
3.18
8.59
4.55
8.43
4.11
1.11
6.55
6.14
16.64
1. 50
8.63
10.92
3.82
4.31
1. 84
3.89
1. 89
9.36
10.00
3.27
10.48
3.92
1. 83
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS .
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
Projected to TD
lAB Inclination
RIG-
TREE: FMC 4-1/16" 5M
A
RA Tag 6347'
DATE
10/1212004
!\IUK TRIOLO
GL Compll'ltion
hanger & packoff
I
I
109'
· ..
~ ~ !Æ ~ E (ill F !Æ ~!Æ ~ ~ ~!Æ ;/ FRANK H. MURKOWSKI, GOVERNOR
AI/ASIiA. OIL AND GAS
CONSERVATION COMMISSION !
I
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay S-213AL3
BP Exploration (Alaska) Inc.
Permit No: 204-217
Surface Location: 4347' NSL, 4501' WEL, SEC. 35, TI2N, RI2E, UM
Bottomhole Location: 2757' NSL, 1269' WEL, SEe. 03, TIIN, RI2E, UM (OA)
Dear Mr. Crane:
Enclosed is the approved application for permit to redrill the above development well.
The permit is for a new wellbore segment of existing well PRU S-213A, Permit No. 204-213,
API 50-029-22993-01. Production should continue to be reported as a function of the original
API number stated above.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's petroleum field inspector at (907) 659- (pager).
w? '
Un tyorman
Chairman
BY ORDER OF THE COMM N
DATED this-L day of 0lf,2qo4... /
þtel4C ~
cc: Department ofFISh & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
I. STATE OF ALASKA .
ALASKA O~ND GAS CONSERVATION COM~SION
PERMIT TO DRILL
20 MC 25.005
1b. Current Well Class 0 Exploratory II Development dÌi C ia~~pW1fc)4e
o Stratigraphic Test 0 Service 0 Development Gas I:r'širigle't"o'r\e
5. Bond: 1m Blanket 0 Single Well 11. Well Name an6NuthÞ~: [;1;
Bond No. 2S100302630-277 PBUS.~1~~ 2.} ~
6. Proposed Depth: 12. Field I Pool(s): ..
MD 12128' TVD 5052' Prudhoe Bay Field I Polaris Pool
7. Property Designation:
ADL 028253
o Drill II Redrill
1a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM
Top of Productive Horizon:
2321' NSL, 1796' WEL, SEC. 34, T12N, R12E, UM (OA)
Total Depth: r".,¿I ¢-
2757' NSL, 1269' WEL, SEC. 03~, R12E, UM (OA)
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 618930 y- 5980550 Zone- ASP4
16. Deviated Wells: Kickoff Depth: 5943 feet
Maximum Hole Angle: 93 degrees
S¡>eÇifications
Grade Coupling Length
L-80 IBT 6210'
~
18. Casing Program:
Size
Casing
4-1/2"
Hole
6-314"
Weight
12.6#
y.J("A-
10 (ìÞ /Z,Ocif:
8. Land Use Permit:
13. Approximate Spud Date:
11/01/04
14. Distance to Nearest Property:
9900'
9. Acres in Property:
2560
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 61.90' feet 500' away from S-01 at Top OA
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 2312 Surface: 1807
SettíngDeþth
Top '. . .. ......> .··.··Bottom
MD TVD MD TVD (íncludinQ stage data)
5918' 5022' 12128' 5052' Uncemented Slotted Liner
19. PRESENT WELL CONDITION Sl,jMMARY (To be col11pletedfor RednIlANDRe;,.entryQperatíò('ls)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Effective Depth TVD (ft):1
12139 5082 None 12139 5082
MD
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Michael Triolo, 564-5774
~;~~;r;~;: /Úc- :::ne Sen;~ ::~8:ng;neer -~t=~~750
Permit To Drill I API Number: Permit Approval ,1,1. / 1 See cover letter for
Number: 2o~ - 2..) ? 50- 029-22993-63-00 Date: / 1¡IjÓ '1 other requirements
Conditions of Approval: Samples Required 0 Yes ~o Mud Log Required 0 Yes gNo
____. Hy~rog,en Sulfide Measures [J Ye~NO Directional Survey Required ~Yes 0 No
Other: \ f: s.t BoP£- ~çoo pçJ
M~v.lli ~
Form 10-401 Revised 0 004
Structural
_ Conductor 110' 20"
Surface 2831' 9-5/8"
Intermediate
Production 6565' 7-5/8"
Liner 5749' (oad) 4-1/2"
Liner (AL 1, OBb) 5516' 4-1/2"
Liner (AL2, OBc) 5832' 4-1/2"
Liner (AL3, OBa) 6094' 4-1/2"
Perforation Depth MD (ft):
20. Attachments 0 Filing Fee, $100 0 BOP Sketch
o Property Plat 0 Diverter Sketch
Junk (measured):
None
260 sx Arctic Set (Approx.)
440 sx Arcticset Lite 3, 215 sx CI'G'
110'
2829'
110'
2859'
202 sx Class 'G'
Uncemented Slotted Liner
Uncemented Slotted Liner
Uncemented Slotted Liner
Uncemented Slotted Liner
perfOration Depth TVD (ft):
1m Drilling Program 0 Time vs Depth Plot
o Seabed Report 1m Drilling Fluid Program
6591'
6400' - 12149'
6634' - 12150'
6312' - 12144'
6045' -12139'
5227'
5198'- 5217'
5182' - 5122'
5177' - 5172'
5082' - 5082'
o Shallow Hazard Analysis
1m 20 AAC 25.050 Requirements
APPROVED BV
THE COMMISSION
Date II, I, /lJcI-
~~ I~ /UPlicate
·
Greater p.oe Bay S-213A ML Permit
I Well Name: ···1 S;'2t3A, S-213A L 1, S-213A La~,.S';'2t3AL3J
213AL4
I Type of Well (producer or injector): I Schrader OBd, OBc, OBb, OBa and OA Multilateral Producer I
Surface Location:
S-213a OBd Target Start:
S-213a OBd Target End:
S-213a L 1 OBb Target Start:
S-213a L 1 OBb Target End:
S-213a L2 OBc Target Start:
S-213a L2 OBc Target End:
S-213a L3 OBa Target Start:
S-213a L3 OBa Target End:
S-213a L4 OA Target Start:
S-213a L4 OA Target End:
I AFE Number:
I PLD5M1074
4,346' FSL, 4,500' FEL, Sec. 35, T12N, R11 E
X = 618,929.96 V = 5,980,549.84
2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E
X = 616,389.90 V = 5,978,485.05 Z = 5,180' TVDss
2,757' FSL, 1,269' FEL, Sec. 3, T11 N, R 12E
X - 61 V - Z - 5,155' TVDss
2,545' FSL, 1,607' FEL, Sec. 34, T12N, R12E
X = 616,574.94 V = 5,978,712.43 Z = 5,120' TVDss
2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E
X = 61 V = 5,973,650.05 Z = TVDss
2,172' FSL, 1,873' FEL, Sec. 34, T12N, R12E
X = 616,314.90 V = 5,978,335.05 Z = 5,105' TVDss
2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E
X = 616,999.90 V = Z = 10' TVDss
2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E
X = 616,389.90 V = 5,978,485.05 Z = 5,040' TVDss
2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E
X = 61 V = 5,973,650.05 Z = TVDss
2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E
X = 616,389.90 V = 5,978,485.05 Z = 5,000' TVDss
2,757' FSL,1,269' FEL, Sec. 3, T11N, R12E
X = 616,999.90 V = 5,973,650.05 Z = 4,990' TVDss
KBE = 61.90'
I Rig: I Doyon 16
I Estimated Start Date: I Nov. 1512004
I Operating days to complete: I 50.68
OBd MD 12,149' Well TVDrkb: TD 5,217' Max Inc. 93° KOP 2,870'
OBb MD 12,150' Well TVDrkb: TD 5,122' Max Inc. 99° KOP 6,337'
OBc MD 12,144' Well TVDrkb: TD 5,172' Max Inc. 92° KOP 6,634'
OBa MD 12,139' Well TVDrkb: TD 5,082' Max Inc. 93° KOP 6,070'
OAMD 12,128' Well TVDrkb: TD 5,052' Max Inc. 93° KOP 5,943'
Current Well Information
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Original Well API #:
Sidetrack API #'s
S-213a API OBd #:
S-213a L 1 API OBb #:
S-213a L2 API OBc #:
S-213a L3 API OBa #:
S-213a L4 API OA #.
Well Type:
Current Status:
H2S:
-9,900' to PBU Unit Boundary at Top OA(this is the closest point
in the producing well section to any unit boundary)
-500' to S-01 (Ivishak well) at Top OA
50-029-22993-00
50-029-22993-01
50-029-22993-60
50-029-22993-61
50-029-22993-62
50-029-22993-63
Schrader O-sand Penta-lateral Producer
Planned pre-rig decompletion: Tubing cut at ±5,250' MD
o ppm from produced fluids (approximated to be around 10 ppm due to
contaminated gas lift gas)
Draft Permit 10/21/04
I Greater pr.oe Bay S-213A ML Permit
BHT: 84 of @ 4,400' TVDss ( stimated)
BHP: Static taken on S-213 on 9-18-04 showed an 8.15 ppg EMW.
MDT's taken on S-116 on 12/03 agreed with the recent static, but also showed higher pressures at the
mid/toe of the planned S-213A trajectory
Sand HeaIPsi·(ppg) TVDl"kb TDPsi(ppg)
OA 2,141(8.15) 5,052 2,338 (8.9)
OBa 2,160 (8.15) 5,097 2,352 (8.9)
OBb 2,175 (8.15) 5,132 2,370 (8.9)
OBc 2,194 (8.15) 5,177 2,394 (8.9)
OBd 2,215 (8.15) 5,227 2,414 (8.9)
Cement:
TO / PBTD:
Is this well frac'd?
Mechanical Condition
S-213 Wellhead:
Base Flange height:
Nabor 9ES:
Doyon 16:
Tubing:
Casing
Casing Head:
Casing Hanger:
Tubing Spool:
Tubing Head Adapter:
Tbg. Hanger:
Tree:
Open Perfs:
Tubing / Casing Fluids:
Materials Needed
TVDrkb
5,052
5,082
5,122
5,172
5,217
Comments
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Top of cement on 9-%" casing is at surface.
Top of cement on 7" casing is at 3,000' MD based on bond log run on 1/9/01
5,314' MD TOF inside 3-Y2" tubing.
Yes
FMC 11" Gen 5 with 7" mandrel hanger
Above MSL = 35.90'
KB / MSL = 64.40'
KB / MSL = 61.90'
3-~", 9.3#, L-80, NSCT with tubing cut @ -5,260' MD.
-Cut correlated to GLM @ 5,227
Surface: 9-%", 40#, L-80, BTC to 2,859' MD
Production: 7", 26#, L-80, BTC from surface to 6,507' MD
FMC 11", 5M
7" FMC Mandrel Hanger and packott with 8.000-4 ACME-2G-LH external R&R thread top
FMC 11" X 11" 5M
FMC 11" X 4-1/16", 5M
FMC 11" x 4-~" with 4-Y2" NSCT pup joint
7.11500 EN, CIW BPVT
Cameron 5M,4-1/16"
Currently from 5,892- MD to 6,165' MD (planned to be abandoned with drilling rig)
SW with diesel cap down to -2,000' TVD
6,600'
1 each
40 each
2 lots
3 each
7-%" 29.7# L-80 STL-FJ Casing (Burst: 6,890; Collapse: 4,790)
7-%" STL-FJ Float Shoe and Float Collar
7-%" x 8-~" In-line Centralizers
7-%" casing pups 5',10',20' (Verify with Unique on stock)
7-%" RA Tag
5 x Production liners:
29,210'
730 each
4 each
5 each
1 each
1 each
3 assemblies
4 ~", 12.6#, L-BO, IBT-Mod Slotted liner
4 ~" x 5 %" x 8" Straight Blade Centralizers
7-%" x 4-~" Baker ZXP Liner Top Packer
4-~" Halliburton Float Shoes
6" x 3" x 10' Aluminum KO billet
6.4" x 15' EWS Swell Packer
Baker Level 3 Hookwall Hangers with LEM
2
Draft Permit 10/21/04
Greater
Bay S-213A ML Permit
5,900'
1 each
3 each
1 each
4 each
1 each
5,900'
1 each
4-Y2", 12.6 Ib/tt, L-80, BTC-M tubing
Baker PRM Production Packer 7-%" X 4-'W
Halliburton X-Nipple (3.813" ID)
4-*" Baker CMD Sliding Sleeve
Camco 4-%" X 1" KBG-2 Gas Litt Mandrels
Phoenix pressure gauge
I-wire for the Phoenix gauge
4-Y2" WLEG (Unique Machine)
Surface and Anti-Collision Issues
Surface Shut-in Wells: S-112i and S-120 will need to be shut-in for the rig move on and off S-213A.
Close Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile.
CIOS~~h Well List:
r--~øa~'I!"~"""'~~:-I"-»;~~:~"1~~~''''~-~
Mud Program
8-%" Intermediate Hole Mud Properties: I Freshwater Mud (LSND) PH: 9.0 - 9.5
· Interval/ Density (ppg) Funnel vis I YP I Tauo I PV I API Filtrate I MBT
9.0 - 9.3 45 - 60 22 - 30 3 - 6 12 -18 4 - 6 < 20
Maintain proper fluid rheology & lubricant concentration to achieve the directional
requirements
Optimize mud rheology to maximize ROP while following ECD guidelines
Reduce shaker blindin while drillin the UGNU BDF 263 .
6-%" Production Hole Mud Properties: I LVT-200 MOBM (Versa-Pro)
Interval/ Density (ppg) Stability I YP I Oil: H20 Ratio I PV I API Filtrate I MBT
9.2 650 - 900 16 - 19 80 : 20 < 20 < 5 < 6
Minimize solids/liquid invasion by maintaining optimum PSD of bridging agents.
Maintain minimal ECD's by reducing drill solids accumulation through utilization of
the rigs solids control system and effective dilution.
Interval Specific
Objectives:
Interval Specific
Objectives:
Well Control
Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will
be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below,
BOP equipment will be tested to 3,500 psi.
BOPE and drilling fluid system schematics are on file with the AOGCC.
Production Section-
· Maximum anticipated BHP:
· Maximum surface pressure:
2,312 psi @ 5,052' TVDss (8.8 ppg EMW). Based on S-116 MDT's
1,807 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psVtt)
· Planned BOP test pressure:
· Test Frequency:
· Planned completion fluid:
3,500 psi (7-%" casing will be tested to 3,500 psi)
7 day test cycle (Pre drilling phase) /14 day test cycle (Drilling phase)
Estimated 9.3 ppg Brine / 6.8 ppg Diesel
riM....... j~'y.~n¡I.~..i_11111illi.··DrrUIIIIIIII~""L. .:1._
..Y j. w,"" ...1. .... .' ..' y. "..JR..B .. ...
5,000 psi Working Pressure 3,500/250 psi Rams & Valves
(entire stack and valves 2,500/250 psi Annular
3
Draft Permit 10/21/04
.
Greater p.oe Bay S-213A ML Permit
Disposal
· NO ANNULAR INJECTION ON THIS WELL.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any
metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all
Class I waste to Pad 3 for disposal.
Formation Markers
1m 11' ~'m~m~_¡~~~~iI'jll_.~"'.,IWJ"ßI_~,r!;)~:~lIIIIr-,,: il-' w~_'.[!}
SV6 1,561 N/A 718 8.8 Above KOP
Base Permafrost 1,901 N/A 874 8.8 Above KOP
SV5 2,137 N/A 983 8.8 Above KOP
SV4 2,315 N/A 1,065 8.8 Above KOP
SV3 2,681 N/A 1,233 8.8 No
SV2 2,826 2,926 1,270 8.6 No
SVl 3,153 3,340 1,427 8.7 Pass. Free Gas btw 3,150 & 3,190'
UG4 3,484 3,802 1,585 8.7 No
UG4A 3,510 3,839 1,598 8.8 Heavy Oil throughout
UG3 3,855 4,320 1,763 8.8 Thin coals
UGl 4,410 5,094 2,028 8.8 Heavy Oil throughout
Ma 4,654 5,435 2,145 8.9 Yes
Mbl 4,705 5,507 2,169 8.9 Yes
Mb2 4,750 5,570 2,191 8.9 Oil & Water owe -4766'SS
Mc 4,825 5,683 2,227 8.9 Yes
Na 4,890 5,790 2,258 8.9 Yes
Nb 4,905 5,816 2,265 8.9 Yes
Nc 4,942 5,884 2,283 8.9 Yes
OA 4,990 5,979 2,306 8.9 Yes
OBa 5,035 6,080 2,327 8.9 Yes
OBb 5,070 6,170 2,344 8.9 Yes
OBc 5,1I5 6,312 2,365 8.9 Yes
OBd 5,165 6,591 2,389 8.9 Yes
T.D. 5,155 12,149 Yes
CasinglTubing Program
8-3,4" 7-%" 29.7# L-BO STL-FJ 6,565' 26' I 26' 6,591' I 5,227'
6-3,4" OBd 4- W' slotted 12.6# L-BO IBT 5,749' 6,400' I 5,198' 12,149' 15,217'
6-3,4" OBb 4-%" slotted 12.6# L-BO IBT 5,516' 6,634' 15,182' 12,150' 15,122'
6-3,4" OBc 4-%" slotted 12.6# L-80 IBT 5,B32' 6,312' 15,177' 12,144' / 5,172'
6-3,4" OBa 4-%" slotted 12.6# L-80 IBT 6,094' 6,045' /5,082' 12,139' / 5,082'
6-3,4" OA 4-%" slotted 12.6# L-BO IBT 6,210' 5,918' / 5,022' 12,12B' / 5,052'
Tubing 4-%" 12.6# L-BO IBT-M 5,B44' 26' / 26' 5,B70' / 5,000'
Cement Calculations
Casing Size 19-% -in 40-lb/ft L-80 BTC surface casing Cement KO Plug
Basis 200% excess in open hole 50% excess in annulus. Top of KO plug 2,300' MD
Total Cement Vol: Wash None
Spacer None
Lead None
Tail 70-bbl,423-sx AS1 - 0.93 ft;j/sx
of tail at
Temp BHST == 50°F from SOA, BHCT 65°F estimated by Dowell
4
Draft Permit 10/21/04
· Greater preoe Bay S-213A ML Permit
Casing Size 17-% -in 29.7-lb/ft L-80 STL-FJ intermediate casing
Basis Top of tail cement 500-ft MD above top of Schrader Ma-sand. 30% excess over gauge.
Total Cement Vol: Wash 20-bbl Water
Spacer 30-bbI10.7-lb/gal MudPush Spacer
Tail 43 bbl, 202-sx 15.8-lb/gal Premium - 1.20 ft"/sx with D600G - 2gal/sk; 0047-
0.2gal/sk; 0174 - 3% BWOC; B153 - 0.15gal/sk
of tail at Ma: MD
Temp BHST :::: 85°F from SOR, BHCT 90°F estimated by Dowell
7-0/." Casing Space Out
a) Space 7-%" casing out with pups and long/short joints as required to place the top of a long full joint - 5-
15' above the top of the OBc, OBa and OA sands to allow for the window to be milled just below the top
of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance
reservoir contact depending on the angle of intersection of each zone.
b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth
except on the OBd lateral. It will need to be placed 120' above the casing shoe.
c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out.
7-%" String Centralizer Placement
a) Centralizer size: 7-%" X 8-Ÿ2" Integral centralizers (7-%" X 8-Ÿ2" X 17-Ÿ2")
b) Do not run centralizers on the window joints spaced at the top of each sand.
c) Centralizers will be run on the first 40 joints to allow for adequate standoff for cement.
d) The centralizer program is subject to change pending modeling and hole conditions.
4 W' Slotted Liner Centralizer Placement
a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking
is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop
collar. Do not put any centralization on the first two joints above the bent joint.
Survey and Logging Program
8-%" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only)
Open Hole: MDT Pressures & Fluid Samples
Cased Hole: USIT Bond Lo (onl as contingenc if oor cement ·ob
6-%" Hole Section: Surveys will need to be IFR + MS corrected real time
Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (Den/Neu recorded only) I AIM I PWD
Cased Hole: None
5
Draft Permit 10/21/04
· Greater pr.oe Bay S-213A ML Permit
DrillinQ Hazards and ContinQencies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control I Reservoir Pressures:
Sand
OA
OBa
OBb
OBc
OBd
Heal Psi (ppg)
2,141 (8.15)
2,160 (8.15)
2,175 (8.15)
2,194 (8.15)
2,215 (8.15)
TVDss
5,052
5,097
5,132
5,177
5,227
TD Psi (ppg)
2,338 (8.9)
2,352 (8.9)
2,370 (8.9)
2,394 (8.9)
2,414 (8.9)
TVDss
5,052
5,082
5,122
5,172
5,217
Comments
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
Based on Static and MDT pressures
II. Hydrates and Shallow gas:
A. Gas hydrates are present below S-pad, but have not been a significant issue thus far during S-Pad drilling. If
hydrates are encountered follow the recommended practice and apply good drilling operational practices.
III. Lost CirculationlBreathing:
A. Lost circulation is possible within the Schrader interval due to the reduced pore pressure. A LCM decision tree
has been developed to give direction in the event of losses.
B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee.
IV. Kick Tolerancellntegrity Testing:
A. The 9-%" casing has been cemented to surface.
B. The 7-%" flush joint casing will be cemented with 15.81b/gal cement to 500' MD above the Ma sand.
C. Integrity Testing: NOTE: If the LOT I FIT is less then the minimum notify the ODE immediately
Surface 1 8-3,4" 52.2 9.2 8.9 12.2 (LOT)
Intermediate 16-3,4" Infinite 9.2 8.9 10.5 (FIT)
NOTE: FIT's will only be done on the first horizontal lateral due to pressure connectivity
between subsequent laterals.
NOTE: All LOT I FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole
drilled outside of the previous casing string
V. Stuck Pipe
A. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners
moving as much as possible and run one centralizer per joint to help with standoff.
VI. Hydrogen Sulfide
A. S-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be
followed at all times. In Nov. 2003 85 ppm of H2S was measured at one S-Pad well (S-05A), however all other
wells tested below 20 ppm in 2004 and since the reading, S-05A has been shut in.
VII. Faults
There is one planned fault crossing and two possible fault crossings while drilling the well. It is also possible to
encounter sub-seismic faults along the proposed well path. In the production hole sections, if a fault throws us out
of section steer up as fast as possible to determine where we are within the section. This will make it easy to
lows ide OH sidetrack to get back on course.
Fault #1: UG1 5,202' MD
Fault #2: a-sands 5,900' MD
Fault #3: a-sands 6,825' MD
4,485' TVDss
4,952' TVDss
5,176' TVDss
25' Northeast throw
o - 20' Northeast throw
o - 35' Northeast throw
CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
6
Draft Permit 10/21/04
· Greater p.oe Bay S-213A Ml Permit
Drill and Complete Procedure Summary
Pre-Ri2 Work:
1. Rig up Schlumberger slickline, and drift tubing down to the jet pump fish with drift appropriate for 3.5" chemical/jet
cutter. Last well operation was CTU fishing attempts to retrieve the jet pump. Last tag was at 5,314' CTU MD.
a. NOTE: If use the chemical cutter it will be required to have the tubing and annulus hydrostatic pressures
equalized prior to cutting the tubing. It may be desirable to punch holes in the tubing just below the proposed
chemical cut depth in order to allow for pressure equalization. Optional string shot per SOP.
2. RIH w/ chemical/jet cutter. Cut the 3-*" L-80 tubing at approximately 5,250' MD. Chemical cutter is at the
discretion of the Wells Group Representative. This cut will not be fished, however a complete cut is critical to
successful decompletion.
a. NOTE: If chemical cutter is used, then the well should be displaced to seawater prior to making the cut. It is
against SOP to use a chemical cutter in diesel.
3. RU and circulate out the diesel through the tubing cut. Once the tubing and annulus are displaced, bullhead sufficient
seawater below the jet pump to fill the volume (-20 bbls) to the perfs. Observe 1.5 bpm, 2500 psi max. Previous
injectivity tests that were done showed a rate through the jet pump of approximately 1.2 bbls/min @ 2,000 psi surface
pressure. Freeze protect down to 2,000' TVD with diesel.
a. NOTE: This will leave the well -60 psi under-balanced with the formation. A static BHP was taken on
9/18/04 which gave a reservoir pressure of 2,110 psi @ 5,000' TVDss (8.12 ppg EMW). These pressures
assume a diesel gradient of 0.354 psi/ft down to 2,000' TVDss and a seawater gradient of 0.447psilft down to
5,000' TVDss.
b. NOTE: The well should not be left with methanol as a freeze protect fluid, diesel only.
4. Test all packoffs and tubing hanger seals to 5,000 psi for 30 minutes. MITOA and function test all lockdown screws,
repair or replace as needed.
a. Verify tubing and annuls pressures and give to rig during the handover. Set a BPV in the tubing hanger and a
VR plug in the 7x4-%" IA valve. Secure well.
5. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the
handover form.
Drillina Ria Decompletion Operations:
1. MIRU Doyon 16. Circulate out diesel with seawater. Verify the well is dead.
2. Set TWC. Nipple down tree. Nipple up and test BOPE.
3. Pull and lay down the 4-%" tubing (planned tubing cut at -5,250').
4. PU 4,200' of 4" DP and stand back in derrick. MU clean-out BHA with 4" DP and flat bottom mill (or used bit) / boot
baskets / etc. RIH to top of tubing stub PU additional 4" DP, circulate and condition wellbore as required. Pump hot oil
to remove excess paraffin if needed.
5. MU 7" Halliburton EZSV (running OD 5.5") and RIH and set just above tubing stub @ 5,250'). Set packer and test to
1,000 psi. Dump 10 bbls cement on top of EZSV (-261' of coverage). POOH and LD running tool.
6. MU 7" Halliburton EZSV (running OD 5.5") and RIH and set @ 3,150'. POOH and LD running tool.
7. MU 7" multistring casing cutting assembly and RIH to -2,940' MD and cut casing. Close annular and circulate annulus
clean with hot seawater and Safeclean sweep, follow with 9.0 ppg mud.
8. Pull 7" casing and verify cut, circulate and reciprocate casing to clean up remainder of mud/diesel in OA. Remove
wellhead pack-off and LD 7" casing.
9. RIH with cement stinger and lay in 70 bbl Class G 15.7 ppg Arctic Set 1 cement plug from EZSV @ 3,150' to 2,300'
MD. (Assumes 200% excess in open hole portion from 2,940' to 2,860'.) POOH
Tk ~ 1(9 - tþl OIffYlO\L Cv \.
Drillina Ria Sidetrack Operations:
v
1. MU 8-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at ±800' from the
bit in the HWDP section and RIH to top cement plug. Dress off plug, circulate and condition mud. Directionally drill
ahead to TD (Just below the Top OBd) as per directional profile to 6,591' MD / 5,227' TVD.
a. Make short trip as needed, work tight spots as seen.
2. Circulate and condition mud at TD. Make sure hole is clean prior to POOH. POOH, LD drilling BHA.
3. RU Schlumberger DPC MDT tool assembly and RIH and acquire pressure and fluid samples as per the town
Geologist. POOH and LD assembly.
7
Draft Permit 10/21/04
· Greater pr.oe Bay S-213A ML Permit
4. Make clean out trip to TD and circulate and condition mud as appropriate.
5. MU and run 7_%" 29.7# L-80 STL flush joint casing to TD. Cement in one stage to 500' MD above the Schrader Ma
sand. Bump plug with seawater. Land casing on mandrel hanger.
6. Clean pits for displacement. Freeze protect 7_%" x 9_%" annulus with dead crude to 2,200' TVD.
7. PU 6-%" conventional assembly with MWD/GR/Resl Azimuthal Den INeu/PWD and RIH to the float collar. Test the 7-
%" casing to 3,500 psi for 30 minutes. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and
condition mud. Drill 20' of new formation below rathole and perform an FIT to 12.0 ppg EMW.
8. Directionally drill ahead to TD geosteering through the OBd to TD at 12,149' MD I 5,217' TVD (prognosed). Perform
wiper trip, circulate and condition mud as required. Displace well to 9.2 ppg SFMOBM as per MI displacement
procedures.
9. POOH to near OBc window depth, log up across the OBc, OBa and OA windows. POH LD drilling assembly.
10. MU and run 4-%" 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TD. Position liner top packer 40'
below the top OBc sand. POOH and LD liner running assembly.
11. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is
near the top of the OBc sand (planned window exit: 6,312' MD). Orient whipstock to highside. Shear off Whipstock.
Displace wellbore back to MOBM & mill window. POOH
12. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock.
Directionally drill the OBb lateral to TD. Planned TD is 12,150' MD. Circulate and condition mud and perform wiper
trip if necessary. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. POOH.
13. Run and set 4-W slotted liner with 6" aluminum billet and Weatherford GS running tool, POOH and LD liner running
string.
14. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to aluminum
billet in the open hole.
15. Displace well back to MOBM and KO of aluminum billet and directionally drill the OBc lateral to TD. Planned TD is
12,144' MD. Circulate and condition mud and perform wiper trip if necessary. Displace well to 9.2 ppg SFMOBM as
per MI displacement procedures. POOH.
16. Pull whipstock #1. Run 4-%" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker
Lateral Entry Module #1 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools.
17. PU the 7-%" whipstock assembly. Set the whipsock on the OBc liner top packer such that the top of the window is
near the top of the OBa sand (planned window exit: 6,045' MD). Orient whipstock to highside. Shear off of
Whipstock, displace well back to MOBM and mill window. POOH
18. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock.
Directionally drill the OBa lateral to TD. Planned TD is 12,139' MD. Circulate and condition mud and perform wiper
trip. Displace well back to SFOBM and POOH.
19. Pull whipstock #2. Run 4-%" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker
Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools.
20. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is
near the top of the OA sand (planned window exit: 5,918' MD). Orient whipstock to highside. Shear off of Whipstock,
displace well back to MOBM and mill window. POOH
21. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock.
Directionally drill the OA lateral to TD. Planned TD is 12,128' MD. Circulate and condition mud and perform wiper trip.
Displace well back to SFOBM and POOH.
22. Pull whipstock #3. Run 4-%" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook
Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL
brine. POOH.
23. MU 4-W 12.6# BTM-M, L-80 completion assembly and R/H. See completion schematic for details. Land tubing
hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus.
24. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to
3,500 psi. Shear DCK-1 valve.
25. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi.
26. Pull two-way check. Freeze protect the well to 2,000' TVD. Install VR plug in 7-%" casing annulus valves.
27. Install BPV. Secure the well and rig down I move off Doyon 16.
Post-RiQ Work:
1. MIRU slickline. Pull the ball and rod / RHC plug.
2. Pull out DCK-1 shear valve, install GL V in all of the other mandrels as per the PE.
8
Draft Permit 10/21/04
POST RIG - COMPLETION .TREE FMC 4-1/16" 5M .
S 213A L 1 L2 L3 & L WELLHEAD FMC Gen 5 System
- "" 11", 5M csghead w/ 7-5/B" mandrel hanger & packotf
11 " x 11". 5 M , tb g sp 0 0 I w/
11" x 4-1/2" tubing hanger with control line ports
11" X 4-1/16" A daptor Flange
~
Phoenix
Pressure
Gauge
with control
lines to surface
DATE
10/1212004
Ong KB elev (N-9ES) = 644'
I New Plan 1\8 elev (016):: 61.9'
20' X 34" 215.5 Ib/tt, A53 ERW Insulated I 109'
Halliburton X-Nipple (3.813"10) 12,200' TVD I
Junction Specifications:
Junctíon 10 through LEM
Module without díverter 3.65"
Cameo 4-1/2" x 1" KBG-2 GLM's
/4.5" Baker sliding sleeve with 3.813"10
.. 9-518",40# L-80 BTC Csg @ 2,859' MD
4-1/2~, 12.6 Ibltt, L-IO, BTC-M Tubing
Coup 00 52 Orift/lO . 3.833"/3.958"
---- 7-518" X 5-1/2" Baker PRM Packer
Halliburton X-Nipple (3.813"10)
4.5" WLEG I 5,870' MD I
9.2 PPG Versapro MOBM below Completion
OA Lateral
15,918'-12,128'1
6-3/4" Open hole Horizontal Laterals
4-112", 12_6 Ib/tt, L-80, BTC-M Liners
Coup 00. 5.2 Orift/lO 3.833"/3.958"
OBa Lateral
16,045'"12,139'1
7-5/8",297#. L-80, STL-FJ
Casing Drift 6.75"
Casing 10: 6.875"
RA Tag TBO
Top Baker LEM Assembly @ 5,868' M D
Window in 7 ·5/8" casmg@ 5,918' M D
Well Inclination @ Wmdow :: 62'
Top Baker LEM Assembly @ 5,995' M 0
Window in 7-5/8' casing@ 6,0"'5' M 0
Well Inclination @ Window:: 65'
Top Baker LEM Assembly @ 6,262' MD
Window in 7-5/8" casing@ 6.312'MD
Well Inclination @ Window:: 7'"
REV BY
OBd Lateral
16,591'.12,1491
GLhi6fl4r
API NO: 50"029-22993.00
50-o29-22993-)()(
50..Q29-22993-xx
50-o29"22993-)()(
50-o29-22993-xx
7-518" Casing Shoe @ 6.591' MD
COMMENTS
MlK TRIOLO
level' Mulli.lateral, 4-112- Gl Completion
POLARIS
WELL: S-213A ML
g
o
o
~
§:
,..
II
Q)
-æ
(,)
(/)
o
¡::
bp
Schlumberger
WELL
FJELD
STRUCTURE S-PAD
S-213AL4 (P4)
Prudhoe Bay Unit - WOA
Magnetic Parameters
Moder: aGGM 2004
I $urfaceLocaliOl1
Date: November 15, 2004 LaI" N702119.849
FS' 57608.7n1 Loo' W14922.95Ð
TVD Ref: Rotary Table (81.90 It above Mal)
StvyDate: October02,2()().4
NAD27 Alaska State Planes. Zone 04, US Feel
NOI1hing: ~549.84 nus Grid Conv; +(1.90963906"
Eaellng: 618929.96 flUS Scale Fact: 0.0099160616
MiscøIlaneous
Slot: 5-213
Plan' S·213Al4 (P-4) OA
Dip: 80.844'
MagDec: +24.845"
.
1800
4200
5400
2400
3000
3600
4800
6000
6600
4800
· .
· .
· .
; Top Whipstock ¡ ¡ ; f i f ~ ~
;t: Base Whipstock ; ¡ ¡ ! ! ¡ : !
¡ KOP Cry 12/100 ¡ ¡ ¡ ~.213AL4 T4 ¡ ; ¡ ¡
..,:,. ,")op·;i~;'¡\ ·········r~¡fr····m... ····~;lr\ r;~ .m..· ··y~;\v..'~·r·· ......................... ··r:~~~\F;lm···F~'~\[/~;:;';~\:O: ~
¡ ~' --.. ¡ ! t ! . ; , S.213ALI !PSjOBb
¡ : ¡ ¡ ! ! . ¡ ¡ S.213AL2 (PS) OBe
: ~ : \ \ ¡ S.213A (P4) OBd
~",i"~"mrl¡iilmmr ~OO
5400
1800
.
2400
3000
3600 4200 4800 5400
Vertical Section (ft) Azim = 196.54°, Scale = 1(in):600(ft) Origin = 0 N/-S, 0 E/-W
6000
6600
WEll
S-213AL4 (P4)
--
Model: BGGM2004
Dip: 80.844'
Mag Dee: +24.845"
-1600
-2400
-3200
^
^
^
Z
g
o
o
~
~
T""
-4000
II
CD
-¡;¡
o
en
en
v
v
v
-4800
-5600
-6400
-7200
.
.
FIELD
STRUCrn<E S-PAD
Prudhoe Bay Unit - WOA
0...·
FS:
_15·_1
51608.7 liT
-.
Easting"
Surfaoelocalion
Lat" WO 2119.849
Lon: W14922.959
NAD27 Alaska Stale PIaoo$,Zone04, US Foot
5980549.84 fRIS Grid Conv: +O.90963Q()6'
618929.96ft.U$ Scale Fad: 0.9999160676
M............
Slot $-213
Plan: S-213Al4(P4)OA
-4000
-1600
-3200
-2400
µ'~~'\
L,~.
· .
.>.......~...................................................
· .
· .
· .
· .
· . .
· .
· .
· .
¡ So213AL1 T2
-~
213AF.U..·..""·i,,; ...............................
: Cry 6/100 :
¡ =:,o:~ !¡~
· .
· .
0.._....,......"....,......................................,..........
· .
· .
~ Crv6/100' ¡ ¡
¡So213AL4 T5 -----+--... : :
~ End crv---- ~ ~ ~
· .
'H.'......._ H .... ....'.n........... 0" ........ ,.. H......... .............. H ........ ..on"
· .
· .
· .
· .
· .
· .
· .
S-213AL4 T3
End Cry
....,.............
,........"...........................
· .
.....'.n·h...."......,...........,.,............
· .
J____'"'l
d...'.....·,.........,,"............__,........,..............
· .
· .
TO /4-1/2" ~nr
&-213AL3 (PS) OBa
S-2)3AL2 (PS) 0Bc
~......................
-4000
-3£00 -2400 - ¡ 600
<<< W Scale = 1 (in):800(ft) E >>>
Schlumberger
TVDRef: RotaryTaÞIe(61.90ftaboveMSl)
SrvyDaI6: 0ct0ber02.2004
-1600
-2400
-3200
-4000
-4800
-5600
-6400
-7200
Report Date:
Client:
Field:
Structure I Slot:
Well:
Borehole:
UWUAPI#:
Survey Name I Date:
Tort I AHD I DDlI ERD ratio:
Grid Coordinate System:
Location Lat/Long:
Location Grid NIE Y!X:
Grid Convergence Angle:
Grid Scale Factor:
I
Top Whipstock
Base Whipstock
KOP Cry 12/100
Measured I
Depth
(It)
5918.12
5930.12
5943.12
6000.00
6100.00
Comments
90' Pt
6186.00
6200.00
6208.25
6668.38
6700.00
End Cry
Cry 6/100
S-213AL4 T2
6800.00
6900.00
6906.94
7000.00
7100.00
End Cry
Cry 6/100
7141.02
7814.59
7900.00
7905.73
7987.66
S-213AL4 T3
End Cry
Cry 6/100
8686.59
8700.00
8707.92
8716.39
9987.85
S-213AL4 Ti
End Cry
Cry 6/100
Schlumberger
S-213AL4 (P4) Proposal
October 2, 2004 Survey I DLS Computation Method:
BP Exploration Alaska Vertical Section Azimuth:
Prudhoe Bay Unit - WOA t dy Vertical Section Origin:
S-PAD/S·213 IIIllIIty 5 U TVDReferenceDatum:
S-213 SIb. . TVDReferenceElevation:
Plan S-213AL4 OA Fea III Sea Bed I Ground Level Elevation:
500292299363 Magnetic Declination:
S-213AL4 (P4) / October 1,2004 Total Field S1rength:
190.803' 18544.83 ft /6.589/1.691 Magnetic Dip:
NAD27 Alaska State Planes, Zone 04, US Feet Declination Date:
N 70.35551358, W 149.03415537 Magnetic Declination Model:
N 5980549.840 ftUS, E 618929.960 ftUS North Reference:
..0.90963906' Total Corr Mag North·) True North:
0.99991607 Local Coordinates Referenced To:
Inclination I
(deg)
59.29
61.21
61.21
67.94
79.79
90.00
91.66
92.64
92.64
92.60
Azimuth I Sub-Sea TVD I
(deg) (It)
228.50 4960.00
228.50 4965.95
228.50 4972.22
227.24 4996.62
225.28 5024.36
223.72
223.47
223.32
223.32
221.42
92.47
92.31
92.30
92.19
92.06
215.42
209.42
209.00
203.41
197.41
5032.00
5031.80
5031.49
5010.33
5008.88
5004.45
5000.28
5000.00
4996.35
4992.64
4991.19
4967.78
4965.15
4965.00
4963.17
4950.20
4950.03
4950.00
4950.03
4959.29
WellDesign Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 )
91.99
91.99
91.53
91.50
91.06
194.95
194.95
189.84
189.50
184.60
91.06
90.39
90.00
89.58
89.58
184.60
184.15
183.89
183.60
183.60
TVD
(It)
5021.90
5027.85
5034.12
5058.52
5086.26
5093.90
5093.70
5093.39
5072.23
5070.78
5066.35
5062.18
5061.90
5058.25
5054.54
5053.09
5029.68
5027.05
5026.90
5025.07
5012.10
5011.93
5011.90
5011.93
5021.19
Vertical I Along Hole I
Section Departure
(It) (It)
1797.74 2349.77
1806.58 2360.19
1816.25 2371.58
1860.11 2422.92
1943.41 2518.81
2018.97
2031.43
2038.79
2449.11
2477.55
2570.21
2666.27
2673.03
2764.66
2864.32
2905.31
3578.21
3663.33
3669.02
3749.79
4433.48
4446.59
4454.32
4462.58
5701.72
2604.36
2618.36
2626.60
3086.24
3117.83
3217.73
3317.65
3324.58
3417.57
3517.50
3558.49
4231.65
4317.03
4322.75
4404.67
5103.48
5116.88
5124.80
5133.27
6404.70
NS
(It)
-1305.69
-1312.59
-1320.14
-1354.60
-1420.92
-1481.94
-1492.08
-1498.07
-1832.45
-1855.79
-1934.02
-2018.33
-2024.38
-2107.78
-2201.39
-2240.76
-2891.14
-2974.49
-2980.13
-3061.40
-3757.96
-3771.33
-3779.23
-3787.68
-5056.60
Minimum Curvature 1 Lubinski
237.400'
N 0.000 ft, E 0.000 It
Rotary Table
61.90 It relative to MSL
35.90 ft relative to MSL
24.845'
57608.708 n T
80.844'
November 15, 2004
BGGM 2004
True North
+24.845'
Well Head
(7) I (de;~:o J
-1918.19 4.00
-1925.99 16.00
-1934.52 0.00
-1972.59 12.00
-2041.83 12.00
-2101.79
-2111.44
-2117.11
-2432.47
-2453.76
-2515.82
-2569.35
-2572.74
-2613.79
-2648.62
-2660.04
-2833.69
-2852.01
-2852.97
-2863.02
-2919.09
-2920.12
-2920.67
-2921.22
-3001.06
Tool Face I Build Rate Walk Rate I
(deg) (deg/100 It) (deg/100 It)
O.OOG 3.78 -1.52
O.OOG 16.00 0.00
-9.84G 0.00 0.00
-9.30G 11.83 -2.21
-8.75G 11.85 -1.96
12.00
12.00
12.00
0.00
6.00
-8.61G
-8.61G
O.OOG
-91.03G
-91.12G
6.00
6.00
6.00
6.00
6.00
-91.38G
-91.63G
-90.99G
-91.21G
-91.43G
6.00
0.00
6.00
6.00
6.00
O.OOG
-95.07G
-95.23G
-95.04G
O.OOG
0.00
6.00
6.00
6.00
0.00
-146.19G
-146.19G
-145.21G
O.OOG
-90.57G
S-213IS-213IPlan S-213AL4 OAIS-213AL4 (P4)
11.86
11.86
11.86
0.00
-0.11
-0.13
-0.16
-0.17
-0.11
-0.14
-0.15
0.00
-0.54
-0.55
-0.53
0.00
-4.99
-4.99
-4.93
0.00
Northing
(ltUS)
5979213.98
5979206.95
59791 99.27
5979164.22
5979096.80
-1.82
-1.80
-1.80
0.00
-6.01
5979034.85
5979024.56
5979018.48
5978679.16
5978655.49
-6.00
-6.00
-6.00
-6.00
-6.00
5978576.29
5978491.16
5978485.05
5978401.02
5978306.87
-6.00
0.00
-5.98
-5.98
-5.98
5978267.33
5977614.33
5977530.71
5977525.05
5977443.64
0.00
-3.34
-3.34
-3.42
0.00
5976746.34
5976732.96
5976725.05
5976716.59
5975446.67
Easting
(ltUS)
617032.90
617025.21
617016.80
616979.29
616911.11
616852.14
616842.65
616837.08
616527.09
616506.18
616445.38
616393.19
616389.90
616350.19
616316.84
616306.05
616142.76
616125.77
616124.90
616116.14
616071.14
616070.33
616069.90
616069.48
616009.81
.
Latitude
Longitude
N 70.35194588 W 149.04972834
N 70.35192702 W 149.04979167
N 70.35190639 W 149.04986092
N 70.35181223 W 149.05016989
N 70.35163098 W 149.05073191
N 70.35146425 W 149.05121852
N 70.35143655 W 149.05129686
N 70.35142017 W 149.05134285
N 70.35050641 W 149.05390219
N 70.35044263 W 149.05407497
N 70.35022885 W 149.05457852
N 70.34999849 W 149.05501290
N 70.34998195 W 149.05504035
N 70.34975408 W 149.0553_
N 70.34949830 W 149.0556
N 70.34939075 W 149.05574847
N 70.34761379 W 149.05715604
N 70.34738606 W 149.05730448
N 70.34737064 W 149.05731227
N 70.34714860 W 149.05739361
N 70.34524561 W 149.05784649
N 70.34520910 W 149.05785476
N 70.34518751 W 149.05785924
N 70.34516443 W 149.05786370
N 70.34169776 W 149.05850751
Generated 10/2/2004 2:20 PM Page 1 of 2
Com",e"ts Measured I Inclination I Azimuth subosea TVD I TVD Vertical I Along Hole I Ns EW I DLs I Tool Face I Build Rate I Walk Rate I Northing Easting Latitude Longitude
Depth Section Departure
(It) (deg) (deg) (It) (It) (It) (It) (It) (It) (deg/IOO It) (deg) (deg/IOO It) (deg/IOO It) (ltUs) (ltUs)
10000.00 89.58 182.87 4959.38 5021.28 5713.54 6416.85 -5068.73 -3001.75 6.00 -90.57G -0.06 -6.00 5975434.54 616009.31 N 70.34166463 W 149.05851303
8-213AL4 T5 10079.52 89.53 178.10 4960.00 5021.90 5789.94 6496.37 -5148.22 -3002.42 6.00 -90.99G -0.06 -6.00 5975355.05 616009.90 N 70.34144746 W 149.05851824
10100.00 89.51 176.87 4960.17 5022.07 5809.29 6516.84 -5168.68 -3001.52 6.00 -90.98G -0.10 -6.00 5975334.61 616011.12 N 70.34139157 W 149.05851089
End Cry 10126.56 89.48 175.28 4960.41 5022.31 5834.17 6543.40 -5195.18 -2999.70 6.00 O.OOG -0.10 -6.00 5975308.15 616013.36 N 70.34131918 W 149.05849605
Cry 6/100 10480.12 89.48 175.28 4963.60 5025.50 6163.66 6896.95 -5547.52 -2970.60 0.00 -90.90G 0.00 0.00 5974956.34 616048.05 N 70.34035663 W 149.05825874
10500.00 89.46 174.09 4963.79 5025.69 6182.10 6916.83 -5567.31 -2968.76 6.00 -90.89G -0.09 -6.00 5974936.58 616050.21 N 70.34030257 W 149.05824373
10600.00 89.37 168.09 4964.80 5026.70 6272.35 7016.82 -5666.06 -2953.27 6.00 -90.83G -0.09 -6.00 5974838.10 616067.26 N 70.34003283 W 149.05811774
10700.00 89.29 162.09 4965.97 5027.87 6357.61 7116.82 -5762.64 -2927.54 6.00 -90.76G -0.08 -6.00 5974741.95 616094.51 N 70.33976901 W 149.05790872
10800.00 89.22 156.09 4967.28 5029.18 6436.95 7216.81 -5856.00 -2891.87 6.00 -90.68G -0.08 -6.00 5974649.18 616131.66 N 70.33951399 W 149.05761895
10900.00 89.15 150.09 4968.70 5030.60 6509.51 7316.80 -5945.12 -2846.63 6.00 -90.59G -0.07 -6.00 5974560.80 616178.31 N 70.33927058 W 149.05725161
8-213AL4 T6 10984.76 89.10 145.00 4970.00 5031.90 6565.09 7401.54 -6016.60 -2801.16 6.00 -90.92G -0.06 -6.00 5974490.05 616224.90 N 70.33907534 W 149.05688251
11000.00 89.09 144.09 4970.24 5032.14 6574.47 7416.79 -6029.02 -2792.32 6.00 -90.91G -0.10 -6.00 5974477.78 616233.94 N 70.33904143 W 149.0568_
11100.00 89.00 138.09 4971.92 5033.82 6631.14 7516.77 -6106.78 -2729.54 6.00 -90.81G -0.09 -6.00 5974401.03 616297.94 N 70.33882905 W 149.0563
End Cry 11104.06 88.99 137.84 4971.99 5033.89 6633.26 7520.83 -6109.79 -2126.82 6.00 O.OOG -0.08 -6.00 5974398.05 616300.71 N 70.33882081 W 149.05627
TD /4-1/2" Lnr 12128.22 88.99 137.84 4990.00 5051.90 7165.27 8544.83 -6868.87 -2039.53 0.00 O.OOG 0.00 0.00 5973650.05 616999.90 N 70.33674768 W 149.05070112
Leqal Description:
Northin~ IYI [ftUSl Eastinq IXI [ftUSl
Surface; 4346 FSL 4500 FEL 835 T12N R12E UM 5980549.84 618929.96
Tie-In: 4346 F8L 4500 FEL 835 T12N R12E UM 5980549.89 618929.86
S-213AL4 T2: 2321 F8L 1796 FEL 834 T12N R12E UM 5978485.05 616389.90
8-213AL4 T3: 1365 F8L 2077 FEL S34 T12N R12E UM 5977525.05 616124.90
8-213AL4 T4; 566 FSL 2146 FEL 834 T12N R12E UM 5976725.05 616069.90
S-213AL4 T5; 4477 F8L 2229 FEL 83 T11N R12E UM 5975355.05 616009.90
8-213AL4 T6; 3608 FSL 2029 FEL 83 T11N R12E UM 5974490.05 616224.90
TD / BHL; 2157 FSL 1269 FEL 83 T11 N R12E UM 5973650.05 616999.90
.
WellDesign Ver 3.1 RT-8P3.03-HF5.00 Bld( do31 rt-546 )
S-213\8-213\Plan S-213AL4 OA\8-213AL4 (P4)
Generated 10/2/2004 2:20 PM Page 2 of 2
----'294
.. ···200
.. ····100
-0
100
200
----'294
Field: Prudhoe Bay
Site: PB S Pad
Well: S-213
Wellpath: Plan S-213A OBd
270
180 H.
Travelling Cylinder Azimuth (TFO+AZI) [degJ vs Centre to Centre Separation [100ft/in]
.
S-44~S~LlPBI)
S-42~s¡41!J-42PB I)
90
.
.
Schlumberger
Anticollision Report
.
Company:
Field:
Ref'e..ence Site:
Ref'ei'ëI1Ce Well:
Ref'e..ence Wellpath:
BP Amoco
Prudhoe Bay
PB S Pad
S-213
Plan S-213A OBd
Date: 10/1/2004
Time: 14:52:27
Page:
OHt..dinate(NE) Ref'e..ence:
Vertical (TVD) Ref'e..ence:
Well:S-213.True North
S-213APlan 61.9
NO GWBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 2870.00 to 12149.14 ft
Maximum Radius: 1??oo.00 ft
Reference:
Error Model:
Scan Method:
Error Suñace:
Db: Sybase
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 10/112004 Validated: No Version: 7
Planned From To Survey Toolcode Tool Name
ft ft
155.50 2856.62 Survey #3 MWD+IFR+AK (155.50-6463.17) ~D+IFR:AK MWD + IFR [Alaska]
2856.62 4000.00 Planned: Plan #4 V1 MWD MWD - Standard
2856.62 12149.14 Planned: Plan #4 V1 MWD+IFR+MS MWD + IFR + Multi Station
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
2870.00 2838.75 9.625 12.250 9 5/8"
6591.24 5226.90 7.000 8.750 7"
12149.14 5216.90 4.500 6.125 4 1/2"
Summary
< Offset Wellpath .,. Reference Offset Ct.--Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft
PB S Pad Plan 8-111 Plan 8-111 V5 Plan: PI 2877.85 5250.00 3744.50 49.04 3695.46 Pass: Major Risk
PB S Pad Plan S-203 Plan S-203 (East) V3 P 2881.16 3500.00 1771.79 50.71 1721.08 Pass: Major Risk
PB 8 Pad Plan 8-203 Plan 8-203 (West) V5 P 2885.78 3000.00 1187.65 47.84 1139.81 Pass: Major Risk
PB S Pad Plan S-208 Plan S-208 VO Plan: 8- 2870.00 4900.00 3504.21 65.80 3438.42 Pass: Major Risk
PB 8 Pad Plan 8-400 S-400 VO Plan: S-400 w 5429.03 5484.70 1009.70 71.70 938.01 Pass: Major Risk
PB 8 Pad Plan 8-401 S-401 VO Plan: 8-401 w 4323.71 4978.43 1567.05 104.95 1462.09 Pass: Major Risk
PB 8 Pad S-01A 8-01A V1 4757.90 4850.00 434.56 107.83 326.73 Pass: Major Risk
PB S Pad S-01B 8-01 B V1 4755.10 4850.00 431.88 107.81 324.07 Pass: Major Risk
PB 8 Pad 8-01 8-01 V1 4389.20 4450.00 429.06 78.84 350.22 Pass: Major Risk
PB 8 Pad 8-02APB1 S-02APB 1 V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk
PB S Pad 8-02A 8-02A V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk
PB 8 Pad 8-02 8-02 V1 2918.54 2850.00 670.03 42.39 627.64 Pass: Major Risk
PB 8 Pad S-03 8-03 V1 3305.22 3450.00 216.58 51.14 165.44 Pass: Major Risk
PB 8 Pad 8-04 S-04 V1 2871.00 2900.00 760.33 40.84 719.49 Pass: Major Risk
PB 8 Pad 8-05APB 1 S-05APB1 V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk
PB 8 Pad 8-05A 8-05A V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk
PB 8 Pad 8-05 S-05 V1 2878.78 2950.00 859.37 45.19 814.18 Pass: Major Risk
PB 8 Pad 8-06 8-06 V1 2890.12 3000.00 940.33 41.69 898.63 Pass: Major Risk
PB 8 Pad S-07A 8-07A V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk
PB 8 Pad S-07 S-07 V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk
PB 8 Pad S-08 S-08 V1 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk
PB 8 Pad S-08 8-08A V2 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk
PB 8 Pad 8-08 S-08B V3 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk
PB S Pad 8-09 S-09 V1 2895.57 3150.00 1251.18 45.20 1205.98 Pass: Major Risk
PB 5 Pad S-1OO S-100 V10 2912.46 3450.00 1762.32 49.87 1712.45 Pass: Major Risk
PB 8 Pad 5-101 8-101 V3 2938.56 2850.00 760.17 42.65 717.52 Pass: Major Risk
PB S Pad 8-101 S-101PB1 V9 2938.56 2850.00 760.17 42.79 717.38 Pass: Major Risk
PB S Pad S-102 8-102 V11 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk
PB 5 Pad S-102 S-102L1 V5 2881.77 3900.00 1933.31 48.14 1885.17 Pass: Major Risk
PB S Pad 8-102 8-102L1PB1 V7 2881.77 3900.00 1933.31 48.10 1885.22 Pass: Major Risk
PB 5 Pad 5-102 8-102PB1 V14 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk
PB S Pad 5-103 S-103 V6 2881.65 3450.00 1347.35 46.75 1300.61 Pass: Major Risk
PB S Pad 8-104 8-104 V1 2870.00 5400.00 3878.94 44.26 3834.68 Pass: Major Risk
PB S Pad 5-105 8-105 V5 2883.61 3650.00 1555.81 39.54 1516.27 Pass: Major Risk
PB S Pad S-106 S-106 V2 2887.09 3600.00 2068.73 47.39 2021.34 Pass: Major Risk
PB S Pad S-106 S-106PB1 V12 2887.09 3600.00 2068.73 47.40 2021.33 Pass: Major Risk
PB 5 Pad S-107 5-107 V36 2878.56 3900.00 2301.09 46.30 2254.79 Pass: Major Risk
PB 8 Pad S-108 5-108 V6 2880.80 3050.00 421.07 34.55 386.53 Pass: Major Risk
PB 5 Pad S-109 8-109 V8 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk
PB 5 Pad 8-109 5-109PB1 V2 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk
PB S Pad 5-10APB1 8-10APB1 V1 2872.76 3199.96 1348.18 48.50 1299.68 Pass: Major Risk
-~---,._.~-
. Schlumberger .
Anticollision Report
Company: BP Amoco Date: 10/1/2004 Time: 14:52:27 Page: 2
Field: Prudhoe Bay
Reference Site: PB 5 Pad CCHlrdinate(NE) Reference: Well:S-213, True North
Reference Well: S-213 Vertical (fVD) Reference: 5-213APlan 61.9
Reference Wellpath: Plan 5-213A OBd Db: 5ybase
Summary
< Offset Wellpath > Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft
PB 5 Pad 5-10A 5-10A V1 2873.72 3200.00 1347.74 48.40 1299.34 Pass: Major Risk
PB S Pad 5-10 5-10 V1 2872.76 3.199.96 1348.18 48.50 1299.68 Pass: Major Risk
PB S Pad 5-110 5-110V18 2870.00 6550.00 4651.88 39.67 4612.21 Pass: Major Risk
PB 5 Pad 5-112 S-112 V20 2893.00 3150.00 582.00 36.48 545.52 Pass: Major Risk
PB S Pad 5-113 S-113 V14 2893.56 3150.00 1528.06 . 45.75 1482.31 Pass: Major Risk
PB S Pad 5-113 5-113A V3 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk
PB 5 Pad 5-113 S-113B V6 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk
PB S Pad 5-114 5-114 V13 2892.01 3300.00 1745.06 47.40 1697.66 Pass: Major Risk
PB S Pad 5-114 S-114A V6 2892.01 3300.00 1745.06 47.25 1697.81 Pass: Major Risk
PB S Pad 5-115 S-115 5T V1 Plan: Plan 2922.45 2900.00 811.20 41.17 770.03 Pass: Major Risk
PB S Pad 5-115 5-115V7 2922.50 2900.00 811.15 41.07 770.08 Pass: Major Risk
PB S Pad 5-116 S-116V6 2916.24 2800.00 782.12 39.78 742.35 Pass: Major Risk
PB 5 Pad 5-117 S-117V4 2926.49 2850.00 492.13 41.03 451.09 Pass: Major Risk
PB 5 Pad 5-118 5-118 V5 4237.72 4150.00 394.20 67.71 326.49 Pass: Major Risk
PB S Pad 5-119 Plan 5-119A V1 Plan: P 2873.02 4400.00 2971.07 58.88 2912.19 Pass: Major Risk
PB 5 Pad 5-119 S-119 V3 Plan: Plan #4 2873.02 4400.00 2971.07 48.53 2922.54 Pass: Major Risk
PB 5 Pad 5-11 S-11 V4 2886.40 3250.00 1413.56 45.69 1367.87 Pass: Major Risk
PB S Pad S-11 S-11A V1 2886.89 3250.00 1413.87 45.70 1368.17 Pass: Major Risk
PB S Pad S-11 S-11B V1 2887.16 3250.00 1414.05 45.70 1368.34 Pass: Major Risk
PB S Pad 5-120 S-120 V4 2942.39 3000.00 1217.48 43.83 1173.65 Pass: Major Risk
PB 5 Pad S-123 5-123 V10 2876.04 3150.00 1457.13 40.64 1416.49 Pass: Major Risk
PB S Pad 5-12A 5-12A V1 2879.26 3300.00 1609.60 41.35 1568.25 Pass; Major Risk
PB 5 Pad S-12 5-12 V1 2876.24 3350.00 1673.36 43.57 1629.79 Pass: Major Risk
PB 5 Pad 5-13 5-13 V1 2883.15 3350.00 1748.65 46.55 1702.10 Pass: Major Risk
PB 5 Pad 5-14 Drilling091604 S-14A V 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk
PB S Pad 5-14 S-14 V5 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk
PB 5 Pad 5-15 S-15 V2 3609.09 3600.04 761.47 63.88 697.59 Pass: Major Risk
PB S Pad 5-16 5-16 V1 3786.80 3750.00 865.48 81.27 784.21 Pass: Major Risk
PB 5 Pad 5-17 S-17 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB S Pad 5-17 5-17A V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 5 Pad 5-17 S-17AL1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 5 Pad 5-17 5-17APB1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 5 Pad S-17 5-17B V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk
PB 5 Pad 5-17 5-17C V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk
PB 5 Pad S-17 5-17CPB1 V2 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk
PB 5 Pad 5-17 5-17CPB2 V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk
PB 5 Pad 5-18 5-18 V1 2912.30 2650.00 2187.88 61.21 2126.67 Pass: Major Risk
PB 5 Pad 5-18 5-18A V16 2921.24 2650.00 2189.46 61.44 2128.02 Pass: Major Risk
PB 5 Pad 5-19 S-19 V1 3107.07 3050.00 609.87 49.07 560.80 Pass: Major Risk
PB S Pad 5-2ooPB1 S-200PB1 V4 2877.44 2950.00 297.53 43.84 253.69 Pass: Major Risk
PB 5 Pad 5-200 S-2OO V2 2877.44 2950.00 297.53 43.95 253.58 Pass; Major Risk
PB 5 Pad S-201 S-201 V2 2873.65 3700.00 1590.52 43.80 1546.72 Pass: Major Risk
PB S Pad 5-201 S-201PB1 V11 2879.52 3700.00 1587.91 45.59 1542.32 Pass: Major Risk
PB 5 Pad S-20 S-20 V4 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk
PB S Pad S-20 S-2OA V2 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk
PB 5 Pad 5-213 5-213 V9 3046.08 3050.00 4.72 40.77 -36.05 FAIL: Major Risk
PB 5 Pad 5-215 5-215 V9 8660.10 6930.00 1126.17 129.52 996.66 Pass: Major Risk
PB 5 Pad S-216 S-216 V2 2896.92 2900.00 802.63 42.17 760.46 Pass: Major Risk
PB 5 Pad 5-21 S-21 V1 3203.91 3300.00 720.37 54.95 665.42 Pass: Major Risk
PB 5 Pad 5-22A 5-22A V1 3366.54 3350.00 596.94 57.10 539.84 Pass: Major Risk
PB S Pad S-22B S-22B V2 3366.54 3350.00 596.94 57.21 539.73 Pass: Major Risk
PB S Pad 5-22 5-22 V1 3366.59 3350.00 596.67 57.12 539.54 Pass: Major Risk
PB 5 Pad 5-23 5-23 V1 3246.07 3300.00 665.69 52.31 613.38 Pass: Major Risk
PB S Pad 5-24 5-24 V5 2966.51 3000.00 744.00 42.81 701.19 Pass; Major Risk
PB S Pad 5-24 5-24A V1 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk
PB 5 Pad 5-24 S-24B V2 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk
PB S Pad 5-25APB1 S-25APB1 V2 2881.08 3050.00 745.08 67.79 677.28 Pass: Major Risk
PB 5 Pad S-25A 5-25A V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk
PB 5 Pad S-25 5-25 V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk
PB S Pad 5-26 S-26 V1 2889.85 2950.00 833.32 38.07 795.25 Pass: Major Risk
PB 5 Pad 5-27 5-27 V1 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk
PB S Pad 5-27 5-27A V3 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk
PB S Pad S-27 5-27B V7 2875.81 2950.00 869.73 37.73 831.99 Pass: Major Risk
~""----_.'--'--._-.....--~...,..~.-..,...-_..-.- -.-..
. Schlumberger .
Anticollision Report
Company: BP Amoco Date: 10/1/2004 Time: 14:52:27 Page: 3
Field: Prudhoe Bay
Reference Site: PB 5 Pad ClHlrdinate(NE) Reference: Well:S-213, True North
Referenœ Well: 5-213 Vertieal (TVD) Reference: S-213A Plan 61.9
Refel"ence Wellpath: Plan S-213A OBd Db: 8ybase
Summary
< Offset Wellpath > Reference Offset Ctr--Ctr No-GO Allowable
Site Well Wellpath MD MD Distance Al"ea Deviation Warning
ft ft ft ft ft
PB 8 Pad S-28 8-28 V4 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk
PB 5 Pad 5-28 5-28A V1 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk
PB 5 Pad 8-28 8-28B V2 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk
PB S Pad 5-28 5-28BPB 1 V7 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk
PB S Pad S-29AL 1 S-29AL 1 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk
PB S Pad 8-29A Plan 8-29AL2 VO Plan: 2900.27 3050.00 1429.74 57.24 1372.50 Pass: Major Risk
PB 8 Pad 5-29A 5-29A V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk
PB 8 Pad 8-29 Plan 5-29B V1 Plan: 8- 2900.27 3050.00 1429.74 57.34 1372.40 Pass: Major Risk
PB 8 Pad 8-29 S-29 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk
PB 8 Pad S-30 8-30 V1 2900.00 3050.00 1016.14 38.62 977.52 Pass: Major Risk
PB 5 Pad 8-31A S-31A V3 3224.79 3700.00 755.81 64.61 691.20 Pass; Major Risk
PB 8 Pad 8-31 8-31 V1 3224.79 3700.00 755.81 64.61 691.20 Pass: Major Risk
PB 5 Pad S-32 8-32 V1 2889.28 3200.00 1300.39 45.96 1254.43 Pass: Major Risk
PB 8 Pad S-33 S-33 V1 2900.00 3100.00 1162.82 39.24 1123.58 Pass: Major Risk
PB S Pad 8-34 S-34 V1 2879.25 3200.00 1439.74 36.64 1403.10 Pass: Major Risk
PB S Pad 8-35 S-35 V1 2874.27 3550.00 1411.58 56.50 1355.08 Pass: Major Risk
PB 8 Pad 8-36 S-36 V1 2876.35 3300.00 1489.80 38.52 1451.28 Pass: Major Risk
PB 8 Pad S-37 S-37 V1 2880.94 3350.00 1567.21 39.45 1527.76 Pass: Major Risk
PB 8 Pad S-38 S-38 V1 2876.14 3150.00 1268.58 36.10 1232.48 Pass: Major Risk
PB S Pad 8-40A S-4OA V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk
PB S Pad 8-40 S-40 V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk
PB S Pad 8-41L1 5-41L1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk
PB 8 Pad 8-41PB1 S-41PB1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk
PB S Pad S-41 8-41 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk
PB 5 Pad 8-42PB 1 S-42PB1 V1 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk
PB S Pad 8-42 S-42 V2 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk
PB 8 Pad 8-43L 1 S-43L 1 V2 2870.79 3150.00 647.04 38.61 608.42 Pass: Major Risk
PB 8 Pad 8-43 8-43 V3 2870.79 3150.00 647.03 38.50 608.53 Pass: Major Risk
PB S Pad 8-44L 1 PB 1 8-44L1PB1 V3 2896.64 2950.00 199.72 35.01 164.72 Pass: Major Risk
PB 8 Pad S-44L 1 S-44L 1 V5 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk
PB S Pad S-44 8-44 V10 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLNAME/~?( ,-Ç'-2/3A¿3
PTD# Zoy - 2/ 7
x
Development
Service
CHECK WßA T
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
x
(1f API Dumber
last two (2) digits
are between 60-69)
Exploration
Stratigraphic
~'CLUE'"
Tbe permit is for a new weHboresegment of
existing weD &Lt. 5'-' ::;2./ M .
Permit NO,Zc,",-VJ API No. (fð-o.¿9- -:z.,;¿99g-c:::>/
Production. should continue to be reponed as
a function' of tbe original API number. stated
above.
BOLE ]n accordance witb 20 AAC 25.005(f), an
records, data and logs acquired for tbe pilot
hole must be clearly differentiated 'in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for we)) (name on permit).
PILOT
(PH)
SPACING
EX CEPT] ON
DRY DITCH
SAMPLE
Tbe permit is approved su bj ect ·to fuD
compliance with 20 AAC 25..055~ Approval to
perforate and produce is contingent upon
issuance of ~ conservation order approving a
spa cing e:J ception.
(Company Name) assumes tbe liability of any
protest to tbe spacing .eJception tbat may
occur.
AU dry ditcb sample sets submitted to tbe
Commission must be in no greater 1han 30'
sample intervals from below tbe permafrost
or from wbere samples are first caught and
] 0' sample hiter:vals tbrougb target zones.
.
e
o
o
Well bore seg
Annular Disposal
Field & Pool PRUDHOE BAV, POLARIS OIL - 640160 Well Name: PRUDHOE SA V UN POL S-213AL3 Program DEV
PTD#: 2042170 Company SP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L GeoArea _890 Unit 11650 On/Off Shore On
Administration 1 Penn it fee attached _ _ - - - - - -- yes_
2 leasenumberapQropriate _ _ _ - - - - - - Yes - - - --
3 _U_nique weltn_arne_aod oumb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Ves _ __ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
4 Well JQcated [n_a_ define_dpool_ _ - - - - - - -- yes_ SEE .t\PD fORS-2J3.t\ fORDJSCUS.SIQN Of _SPACING_. RPC
5 WellJQcated prpper _distanœ from driJling unitbpund_ary_ _ _ Yes __
6 Well JQcated proper _distanceJrom Qtber wells_ _ _ _ _ _ Yes
.7 _S~tficient.açrea9-e_aYail.able in_drillio9 unjt _ _ _ _ _ Yes_ - .. - - --
8 Jtdeviated, js_ weJlbQre plaUncju_ded _ _ Yes_
9 _Operator only affected party _ _ _ Yes_
10 _Operator bas_appropriate_bond inJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes_ __ - - - - - - - - - - - - - - - - - - - -
11 Permit cao be issued wjtl)Qut çOMervaJion order _ _ _ _ Yes_
Appr Date 12 _Pe[l1')it~o be issued wjtbQut administratÌ\leapprpval _ _ Yes_
RPC 10/26/2004 13 Can permit be approved before 15-day wait Ves
14 WellJQcaled within area an_d_strata _authorized bylojectiolJ Order # (puUO# in_cJ)mmeots)_(foT Yes _ - - - -
15 AJI wel)s_wit¡'inJl4_l1Jíle_ar~a_of reyiew jdeotified (F9(!~ervjcewe!l onlYL _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ - - - - - - - - - - - - - - - - - - . -
16 Pre-produçed iojeçtor; dur.atiQn_of pre-produGtiolJ less than:3 months_ (for_service well onJy) _ _ No_ _
17 A{;MP F:indjn9 pf Con,Si,Steocy has beeJl issued for_ this pr_oject _ Yes_
Engineering 18 _Cpoductor strinQ_prQvided _ _ _ _ - - - - NA
19 _S~úace _casinQ_pJoteGts all_known USDWs _ NA _
20 _CMTv_oladequ_atetQ circutate_oJlconduçtor& surf~g _ NA - - - -
21 _CMT v_ol adeq uate to tie-in JQng _string to _surf çsQ_ NA _
22 _CMT will çoyeraJl J<oQwnproductiye hQri~ons _ _ _ _ _ _ _ _ No_ Slotie_d, - - - - - -
23 _C_asinQ desigos adeQuaJe for C,_T, B&_ permafr_ost _ Yes_ _
24 Adequ.ateJan_kage_oJ reserve pit _ _ Yes Doypo '16._
25 Jta_re-drill" has_a_ to-403 fQr .abandonment be~m apPJoved _ _ _NA LaJerat
26 AdequateweUbore s;eParatjo_n_proposep_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes_ __ - - - - - - - - - - - - - - - - - - --
27 Jfdjverter Je(!uired, dQes jt meet reQuJa_tions_ _ _ - - - - NA Sidetrack. _ - - - -
Appr Date 28 _DJilIio9 flujd_ program schematic_& e(!uip Jistadequale_ - - - - _ Yes Max MW_9,2 ppg. .
WGA 10/26/2004 29 _BOP!:s,_do_they meetreguJation _ . - - - - Yes_ _. - - - - - -
30 _BOP!:_press raJiog appropriate; Jest loJput PSig tncomments). . Yes__ Test tp3500_ psi.MSf> 1807 psi.
31 _Choke manifold cQmpJies_ w/API Rf>-53lMay 64)_ _ . _ Yes_
32 WQrk will occ~r without pperation _shutdown _ _ _ _ _ _ _ _ . - - - - Yes
33 Js presence Qf H2S gas_ prOQable _ _ . - - -- - - - - _No NoLan H2S pad.
34 Mecha_nicalcooditioo pi w~lIs within .t\OR yerified (Foe service welJ only) _ _ _ NA
~
Geology 35 Pe(TTIit can be issued wlQ hYdrogen s_ulfide meas_ures . _ _Ves_
36 _D_ata_preseoted on_ Qote_ntial overQressurezone$ _ _ _ _NA _
Appr Date 37 _Setsmic_analysis_ Qf shaJlow gas_z_ooes_ _ ___ __ _ _ _ _NA
- - - - - - -
RPC 10/26/2004 38 _Seabed _conditioo survey -<if off-sh_ore) _ . _NA.
- - - -- - - --
39 _ CQnta_cl namelphQlleJorweekly progress_reports [eXQIQratoryoolyt _ _ _NA
Geologic EngineerinQ Date P"bI~ y
Commissioner Date: Commissioner ::;; rDm
.orS' 01 ~1/1- -/