Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-217 · . Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c2 0 Y- - ~L 7- Well History File Identifier Organizing (done) o Two-sided 11111111111 ""1111 o Rescan Needed 1111111111111111111 RES CAN ~olor Items: o Greyscale Items: DIGITAL DATA ~skettes, No.1 o Other, No/Type: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Date L/-/I~ 07 o Other:: BY: ~ /s/ VVlf Scanning Preparation BY: ~ <"~ Date 4-/1 d-I 07 x 30 = 0/,0 Date Lf-/IB-J 07 11/11111111I1111111 Project Proofing BY: ~ /5/ YV1f + 5" = TOTAL PAGES 0;$ (Count does not include cover sheet) VV/t) /s/ I 11111111111111" III Production Scanning Stage 1 Page Countfrom Scanned File: q /¡; Page Count Matches Number in Scanning Preparation: ~ Date: 4-) I d-jo7 If NO in stage 1, page(s) discrepancies were found: (Count does include cover sheet) VYES Stage 1 YES NO /s/ mp NO BY: BY: Maria Date: /s/ 111/1111111I /111111 Scanning is complete at this point unless rescanning is required. ReScanned 11/11111111111 "III BY: Maria Date: /s/ Comments about this file: Quality Checked 1111111111111111111 10/6/2005 Well History File Cover Page.doc • • {.~ ~ . '• ~ 03~o~~zoos DD NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFiche\C~rPgs_InsertslMicrofilm Ma~er.doc ~~ DATA SUBMITTAL COMPLIANCE REPORT 3/12/2007 Permit to Drill 2042170 Well Name/No. PRUDHOE BAV UN POL S-213AL3 Operator BP EXPLORATION (ALASKA) INC Spud ,/J JIM- )¡óÐ ~ API No. 50-029-22993-63-00 MD 12054/ TVD 5016 / Completion Date 2/3/2005,/' Completion Status 1-01L Current Status 1-01L UIC N - _._----_._.._._-~_._-_.- ..- -----_._._._~_.^------_...~ ----^._~---~ --_.'--'..~-_._-_."'._-~._--~.._-~-_._~-"-----."--".-~ ___··__·,o.___·._·."____~__~..·____ _____~~.~__~__.__~___~_~._._~~____~.._.___"~__,_____ ~__~_.______..___~_..__~_.____,____.__.__~~._.__~___.____'_.'._ REQUIRED INFORMATION Mud Log No Samples No Directional Survey Ves ---_..__.._._-,._---._.._--_._._.._-~-_..~-----~~._...'-'--'-"'-"-'~ --~-_.._-------_.._-- -~-_.._..__._--_..._-------_._.-._._.~_._- ___~__._..____~____________________.^~"__..._~"_~__.____..__~,.___ --,------·.---·.------..--_._.'·0.____--··-.---·.....-.____..._....____.,.____ DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / Azimuthal Den / NEU / AIM / PWD Well Log Information: (data taken from Logs Portion of Master Well Data Maint Log/ Data :z 14t ¡Y9 ~Og I ~.. C.. Lis Electr Digital Dataset Med/Frmt Number Name -- _..--_. ......-- --~----".._--- .---- D Asc Directional Survey Log Log Scale Media Run No Interval OH / Start Stop CH -~--_.._--_.._--_._--_._-_.- o 12054 e ----~._....--------",..--._-_._-'---- -_._.._-~_.__._-----------_._-- Received Comments _ _"M~__~___~___ 4/1/2005 Directional Survey 14322 Induction/Resistivity 0 12054 4/1/2005 25 Blu 2856 12054 Open 1/10/2007 MD Vision Service FINAL 27 -Jan-2005 ~/)" Blu 2856 12054 Open 1/10/2007 TVD Vision Service FINAL 27 -Jan-2005 2755 6880 Open 1/10/2007 LIS Veri w/Graphics 14322 Induction/Resistivity 14322 Induction/Resistivity --- - ---.__..__...__...,------_.~---_..~._--- -"-------..-.-..-----..,.--..- -~----~_._.-.- ~____.m___~·..~_ -~-_._-...".~---_.--._------,,--.. -------".------- Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments Formation Tops @/N ff)N . ADDITIONAL INFORMATION Well Cored? vI@, Chips Received? Y / N J Daily History Received? Analysis Received? ~ ___.... _~__.._.__ .. _____.__..___._._~.._ __,__.___,._."____,_______~___.___._____._~_~..______..________ _·__~..__~·_.o_~___~___·."_·__o__...._____.._.___..__" _m_____._____.___ ___."____~_...___..."_.~~___..,,.___~_._..______~__.,,____~____"...______._____. _..____.-____....-,,__~___~ _______.._..~·__m__.________..___...___·_____._________"_ _______....._____._____~_.......______ Comments: ~:~;li:;::~~:Vi::~d·~~:=-~···=~=-=~==---=~~=-···· ...:==:==-==:=-==c:===-====~===~~:t:~'- TJt;-~~65=·~·~C=·· Schlumberger Schlumberger·DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Well L-212 S·213AL 1 S-213AL 1-01 S-213AL2 S-213AL3 6)6</- 911- -rt }43d';;) Job # Log Description 11039112 CH EDIT USIT (PDC·GR 40011201 OH EDIT MWDILWD 40011201 OH EDIT MWDILWD 40011201 OH EDIT MWD/LWD 40011201 OH EDIT MWD/LWD PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc Petrotechnical Data Center LR2-1 900 E Benson Blvd Anchorage AK 99508-4254 Date Delivered" 04118/05 12/20/04 12/25104 01108/05 01/27105 01/08/07 NO. 4105 Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Orion Date BL Color CD 2 2 2 2 . Schlumberger-DCS 2525 Gambel! St. Suite 400 Anchorage. AK 99503-2838 A TTN Beth Received by . . . Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman Well No S-213AL3 Date Dispatched: 1O-Mar-05 Installation/Rig Doyon 16 Dispatched By: 0 Data No Of Prints No of Floppies Surveys 2 Received By: 1ÄJ OJ¡J Please sign and return to: Drilling & Measurements LWD Division 3940 Arctic Blvd. Suite 300 Anchorage. Alaska 99503 nrose1@slb.com Fax: 907-561-8417 LWD Log DeliveryV1.1, 10-02-03 Schlumberger Private ~ûY-2( ) . STATE OF ALASKA . ALASKA· AND GAS CONSERVATION COM ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG RECEIVED 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD / GR / RES / Azimuthal Den / NEU / AIM / PWD CASING, LINER AND CEMENTING RECORD SElTlNG DEPTH MD SETTING DEPTH TVD HOl-E Top BoTTOM Top BoTTOM SIZE Surface 110' Surface 110' 30" 28' 2859' 28' 2829' 12-1/4" 24' 5985' 24' 5050' 8-3/4" 5945' 11084' 5030' 5008' 6-3/4" o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM Top of Productive Horizon: 2997' NSL, 1199' WEL, SEC. 34, T12N, R12E, UM (OA) Total Depth: 2362' SNL, 1340' WEL, SEC. 03, T11 N, R12E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x-_ 618930 . y- 598055~_ Zone-~~~ TPI: x- 616975 y- 5979170 Zone- ASP4 Total Depth: x- 616926 y- 5973810 Zone- ASP4 _______________n_~__ ._________~______..____. --~---~------ 18. Directional Survey 181 Yes 0 No 22. CASING SIZE WT. PER FT. 94# 40# 29.7# 12.6# GRADE' L-80 L-80 L-80 L-80 20" 9-5/8" 7-5/8" 4-1/2" 23. Perforations oRen to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Section MD TVD MD TVD 6541' -11803' 5081' - 5016' 25. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect w/ 100 Bbls of Diesel One Other 5. Date Camp., Susp., or Aband. 2/3/2005 6. Date Spudded 1/23/2005 7. Date T.D. Reached 1/27/2005 8. KB Elevation (ft): 61.82' 9. Plug Back Depth (MD+ TVD) 12054 + 5016 10. Total Depth (MD+TVD) 12054 + 5016 11. Depth where SSSV set (Nipple) 2255' MD 19. Water depth, if offshore N/ A MSL 24. SIZE 4-1/2",12.6#, L-80 1 b. Well CMAA 18 zoos 181 Development Exploratory Äiàj}fiitYf~l¥is ~n~t'b1fimiB8ion 12. Permit to Ii>dU.NuQ1þer 204-217 RnCnOrøye 13. API Number 50- 029-22993-63-00 14. Well Name and Number: PBU S-213AL3 15. Field / Pool(s): Prudhoe Bay Field / Polaris Pool Ft Ft 16. Property Designation: ADL 028253 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Appro x.) CEMENTING RECOAD 260 sx Arctic Set (Approx.) 440 sx AS Lite III, 215 sx Class 'G' 229 sx Class 'G' Uncemented Slotted Liner AMOUNT PUl-l-EO DEPTH SET (MD) 5961' PACKER SET (MD) 5844' 26. Date First Production: March 8, 2005 Date of Test Hours Tested PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Flowing Oll-Bsl GAs-McF WATER-Bsl Oll-Bsl r"~·:-:-~·-:,-~': None ,';;'. .~ z-J)~_ Form 10_40~~1_T2t2003 GAs-McF WATER-Bsl ORIGINAL CONTINUED ON REVERSE SIDE CHOKE SIZE I GAS-OIL RATIO Oil GRAVITY-API (CORR) RBDMS BFl MAR 1 4 2005 if o 28. GEOLOGIC MARKER. NAME MD Schrader Bluff OA 5996' Schrader Bluff OBa 6135' Schrader Bluff OBa 6430' Schrader Bluff OA 6862' Schrader Bluff OA 7053' Schrader Bluff OA 11838' 29. eRMATION TESTS Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". TVD 5055' None 5105' 5104' 5057' 5055' 5016' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I ~erebY certify that the f%in~ is true and correct to the best of my knowledge. Signed Terrie HUbble-'1efv'\lP ~ ~ Title Technical Assistant Date 03 -I V -os PBU S-213AL3 204-217 Prepared By Name/Number: Terrie Hubb/e, 564-4628 Well Number Drilling Engineer: Michae/ Tri%, 564-5774 Permit No. I Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 1 0-407 Revised 12/2003 Submit Original Only S-213A MDT Client BP Exploration Inc Tool pa/ps/lf/scl 'Jo/sc/po/sc/sc/ms/pc Well S-213A Spec D,weather Date 11/29/04 SO File Time Depth Zone Tool TVD Temp Pretest Mob B.afore Formation After Flow presure PumpV pump time Test Typa/còmment '. 5 12:14 5176 ps 90 20 2296 2158 2295 tool check 7 correlation 15 8 correlation 19 14:30 5531 Mb1 ps 94 20 2.4 2340 2293 2339 ç ood test 21 15:00 5630 Mb2 ps 94 20 2387 lost seal could not hold set persure 22 15:20 5631 Mb2 ps 94 20 2383 lost seal could not hold set persure 24 15:30 5728 Mc ps 95 20 4.1 2425 2198 2411 ç ood test 25 1600 5744 Mc ps 95 20 2425 lost seal could not hold set persure 26 16:15 5745 Mc ps 96 20 2418 2414 lost seal 27 16:29 5747 Mc ps 96 20 108.2 2427 2200 2416 ç ood test 28 16:50 5748 Nb ps 96 20 2449 los seal 29 17:03 5849 Nb ps 96 20 17.1 2446 2114 2443 ç ood test 30 17:30 6000 Oa ps 97 20 38.9 2492 2081 2483 ç ood test 31 17:40 6031 Oa ps 97 20 2500 2491 lost seal 32 17:50 6032 Oa ps 97 20 2493 lost seal 33 18:00 6060 Oa ps 98 20 8.2 2505 2110 2494 ç ood test . 34 18:20 6117 Oba ps 98 20 2509 lost seal 35 18:40 6118 Oba ps 98 20 2511 2507 lost seal could not hold set persure 36 19:00 6214 Obb ps 99 20 2535 2524 lost seal 37 19:22 6215 Obb ps 99 20 2527 2523 lost seal 38 19:37 6235 OBb ps 100 20 30.9 2539 2062 2524 ç ood test 39 19:55 6247 OBb ps 100 20 8.8 2542 2067 2525 ç ood test 40 21:00 6402 Obc ps 100 20 2565 2554 dry test 41 21:00 6403 Obc ps 100 20 2556 2549 lost seal 42 21:27 6424 Obc ps 101 20 2567 2551 lost seal 43 21:40 6525 Obc ps 101 20 2556 2550 lost seal 45 2145 6491 Obc ps 102 20 2565 2559 lost seal 46 21:56 6492 Obc ps 102 20 2565 2556 dry test 47 22:05 6496 Obc ps 102 20 2569 2555 dry test 48 22:12 6497 Obc ps 102 20 2563 2556 lost seal 49 22:24 6498 Obc ps 102 20 2563 2555 dry test 50 23:21 6824 Obd ps 103 20 2600 2581 lost seal 51 23:32 6825 Obd ps 103 20 2593 2582 lost seal 52 23:47 6820 Obd 103 20 2577 2577 ç ood test , ·MRSc-,2.4S, ,.... .... .,...... . "N ',jgal;OilSample'. 59 8:13 2555 2559 60 9:54 6491 Obc pa 101 2568 2558 61 11:20 6424. 2581 2556 '2543: "F:'X,';, 700 to 120 700 to 50 700 to 50 27 15795 .'. 60. '30 .' ::·15OOto':l900:; . ;,c. '.' ','60 . "' . . . '" ':, pump up !d 4000 psl.··· . ·1 60 pump ~pío 4000psi;' , "50895.,.·J. 9Ó' þump up to. 4000 psi. ',·;·90675,: I· " 80"" pumÞ uPt~ 40Q0 psi ....' . i';" 1::75'. pump up to 4000 psi' . . coUld not flow CoUld not flow could not flow, . MP.SR.1398· . . 450 cc oil'sample ,,:;. MPRS~1399.:· ::: 450 CC 011 Sat\Ïplé : '. ",450 ccòil sample. '. ·c. MPSR-14oo,:' , MPSR-1401....· . 450 cè,oI ·Sámple· '" ,.MPSR-1402. ..... . 450 cè 011 and Water s. . S-213A MDT Fluid Properties Sample ID Cylinder # Depth Sand GOR Molar Mass Density API (ft) sef/stb (g/ee) 1.01 CSB 7759-QA 6,824 OBd 310 268.3 0.91 24.1 1.02 CSB 7763-QA 6,824 OBd 307 269.1 0.91 24 1.04 CSB 7476-MA 6,177 OBa 234 332.5 0.941 18.8 1.05 CSB 7735-QA 6,177 OBa 225 333.2 0.942 18.8 gas and water/filtrate 1.07 CSB 7753-QA 6,000 OA-Upper 15,670 175 0.836 37.7 only - no oil . 1.08 CSB 7755-QA 6,403 OBe 291 263 0.907 24.5 1.09 CSB 7690-QA 6,247 OBb 260 282.7 0.917 22.8 1.10 CSB 7761-QA 6,059 OA-Lower 212 308.9 0.936 19.7 1.11 CSB 7725-QA 5,747 Me 194 457.9 0.972 14 1.12 CSB 7680-QA 5,531 Mb1 203 480.4 0.98 12.9 . Legal Name: 8-213 Common Name: 8-213 1/3/2001 11/25/2004 12/8/2004 FIT LOT FIT 2,858.0 (ft) 2,856.0 (ft) 6,870.0 (ft) 2,838.0 (ft) 2,828.0 (ft) 5,265.0 (ft) 10.50 (ppg) 9.20 (ppg) 9.00 (ppg) 300 (psi) 820 (psi) 411 (psi) 1,848 (psi) 2,172 (psi) 2,873 (psi) 12.53 (ppg) 14.78 (ppg) 10.50 (ppg) . . Printed: 2/7/2005 9:37:38 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11/17/2004 05:00 - 07:00 2.00 MOB P PRE Move rig off from J-02b. 07:00 - 07:30 0.50 MOB P PRE Pre-move safety meeting with Tool Service, Security and all rig personnel reviewing pre-move route inspection and all rig move 107:30 - 15:00 hazards. 7.50 MOB P PRE Move rig from J-Pad to S-Pad. Security stopped rig move for 2 hrs to clear the road allowing personnel to respond to Z-Pad. 15:00 - 00:00 9.00 MOB P PRE Work on cellar door and flowline mods 11/18/2004 00:00 - 00:00 24.00 MOB P PRE Continue rig mods, cellar doors and flow line. Install vacuum system lines and controls. 11/19/2004 00:00 - 04:30 4.50 MOB P PRE RD flowline platform and scud launcher. 04:30 - 12:00 7.50 MOB P PRE Spot rig over S-213. Spot and RU pit, pump and generator modules. RIG ACCEPTED @ 12:00 HRS 12:00 - 13:00 1.00 I WHSUR P DECOMP RU to tree to circulate. 13:00 - 15:30 2.50 KILL P DECOMP Take on seawater. RU scaffolding in cellar. Berm rig. 15:30 - 16:30 1.00 WHSUR I P DECOMP PJSM. RU DSM and pull BPV through lubricator. RD DSM. 16:30 - 17:00 0.50 WHSUR P DECOMP Hold pre-spud meeting with crew and all service personnel. Review well hazards and SOR. 17:00 - 20:00 3.00 KILL P DECOMP RU lines and pressure test to 2900 psi. Reverse circulate 20 bbls through choke using cellar manifold to remove freeze protect diesel from the tbg. Started taking mixed diesel and crude oil returns to cuttings box. Switched manifold and circulated a 40 bbl detergent sweep surface to surface holding 100-150 psi choke pressure to circulate diesel out of annulus. Circulate a second 40 bbl detergent sweep around to clean up tbg and csg. 20:00 - 21 :00 1.00 KILL P DECOMP Shut in choke and kill lines, monitoring pressure. RD and blow down lines. 0 pressure, open choke and flow check well for 15 121 :00 - 00:00 minutes. 3.00 WHSUR P DECOMP PJSM. ND tree and adapter flange. Break out tree and set behind well. 11/20/2004 00:00 - 01 :00 1.00 WHSUR P DECOMP Break out adapter flange and set out of cellar behind well. Enclose rig cellar with tarps. 01 :00 - 08:00 7.00 BOPSUF P DECOMP NU BOPE. Install HCR valves. Hook up choke & kill lines to HCR valves. NU riser & flow line. RU floor drain lines to flowline manifold. 08:00 - 08:30 0.50 BOPSUP P DECOMP PJSM with all rig personnel on testing BOPE. 08:30 - 09:00 0.50 BOPSUP P DECOMP RU BOP test equipment 09:00 - 12:00 3.00 BOPSUF P DECOMP Test BOPE to 250 /3500 psi. Unable to test lower pipe rams with tbg hanger in the hole. Witness of test waived by John I Crisp with AOGCC. 12:00 - 12:30 0.50 BOPSUP P I DECOMP RD BOP test equipment. Blow down lines. 12:30 - 13:30 1.00 WHSUR P DECOMP PJSM. RU DSM and pull TWC through lubricator. RD DSM 13:30 - 14:30 1.00 PULL P DECOMP RU tbg equipment to pull 3-1/2" completion. 14:30 - 15:00 0.50 PULL P DECOMP MU DP with XO to 4-1/2" NSCT tbg hanger. BOLDS. PU 78k and unseat tbg hanger. Up weight w/ tbg 77k. Pull hanger to floor. 15:00 - 16:30 1.50 PULL P DECOMP Break out and LD tbg hanger. MU to tbg and circulate 40 bbl detergent sweep around while reciprocating tbg 16:30 - 17:00 0.50 PULL P DECOMP PJSM with rig crew on pulling and laying down tbg, Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11/20/2004 17:00 - 23:30 6.50 PULL P DECOMP Pull and LD 3-1/2" completion. Losses averaging 6-7 bph while pulling tbg. Recovered: 1- jt 4-1/2" tbg 161 - jts 3-1/2" tbg 3 - GLM's I 1 - "X" Nipple 1 - 18.71' cut joint of 3-1/2" tbg 123:30 - 00:00 0.50 BOPSUR P DECOMP Monitor well. RU test equipment. Set test plug and fill stack. 11/21/2004 '00:00 - 01 :00 1.00 BOPSUF P DECOMP Test lower pipe rams 250/3500 psi. RD test equipment. 01 :00 - 02:00 1.00 PULL P DECOMP Clear tbg handling equipment from rig floor. Clean rig. 02:00 - 03:00 1.00 CLEAN P DECOMP Install wear bushing. PU BHA #1,6-1/8" clean-out assembly. 03:00 - 08:30 5.50 CLEAN P DECOMP RIH to 5241' with clean out assy picking up 4" DP from pipe shed. Fill DP and break circulation every 25 stands. 08:30 - 09:00 0.50 CLEAN P DECOMP Wash down from 5241' to tbg stub at 5265'. 5 bpm @ 550 psi 09:00 - 10:00 1.00 CLEAN P DECOMP Circulate 20 bbl detergent sweep followed 40 bbl h-vis sweep. Continue circulating to get sweeps out of the hole and clean returns. Losses averaging 6 bph. [p 5 bpm @ 550 psi 10:00 - 13:00 3.00 CLEAN DECOMP Monitor well - level dropping. POH with clean-out assy P/U 107k Ibs S/O 105k Ibs 13:00 - 13:30 0.50 CLEAN P DECOMP LD 6-1/8" clean out BHA. 13:30 - 14:00 0.50 CLEAN P DECOMP Service rig, drawworks, crown, blocks and iron roughneck 14:00 - 15:00 1.00 DHB P DECOMP MU HES 7" EZSV bridge plug assembly. 15:00 - 17:30 2.50 DHB P DECOMP RIH to 5220' 17:30 - 18:00 0.50 DHB P DECOMP Break circulation. POH to 5200 and set EZSV. 18:00 - 18:30 0.50 DHB P DECOMP Pressure test EZSV to 1000 psi. 18:30 - 20:30 2.00 PXA N CEMT DECOMP Circulate while waiting for cement to be re-batched and sent to location. Testing of original cement showed a two hour set time, was sent back to the plant to be re-blended with a minimum 3 hr set time. 20:30 - 21 :00 0.50 PXA P DECOMP PJSM with Schlumberger, MI, Veco and all rig personnel on mixing and pumping cement. 21:00 - 21:15 0.25 PXA P DECOMP Pump 5 bbls water to fill lines. pressure test cement lines to 3500 psi. 21:15 - 21:30 0.25 PXA P DECOMP Batch mix and pump 11 bbls (66 sxs) 15.7 ppg, Arctic Set I cement. Chase with 10 bbls of water behind cement to flush lines. 21 :30 - 22:00 0.50 PXA P DECOMP Switch to rig pump and displace cement with 49 bbls seawater. 22:00 - 22:30 0.50 PXA P DECOMP POH with 5 stands to 4700' 22:30 - 23: 15 0.75 PXA P DECOMP Circulate clean seawater around to ensure DP is free of cement. 5 bpm @ 300 psi 23:15 - 00:00 0.75 PXA P DECOMP Displace well to 9.5 ppg used LSND mud. 5 bpm @ 490 psi 11/22/2004 00:00 - 02:00 2.00 PXA P DECOMP Pump dry job, blow down top drive. POH with setting tool Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11/22/2004 02:00 - 04:00 2.00 PXA P DECOMP MU EZSV #2 and RIH to 3155' 04:00 - 04:30 0.50 PXA P DECOMP PU to 3150' and set EZSV. P/U 84k Ibs S/O 80k Ibs 04:30 - 06:00 1.50 PXA P DECOMP Blow down top drive and POH with setting tool. 06:00 - 07:00 1.00 STCTPL P DECOMP Pull wear bushing and rig up double valve on 9-5/8" X 7" annulus. 07:00 - 09:00 2.00 STCTPL P DECOMP MU BOT csg cutter assembly and RIH to 2950' 09:00 - 10:00 1.00 STCTPL P DECOMP Position cutters @ 2950'. Cut 7" csg. 10:00 - 11 :00 1.00 STCTPL P DECOMP Establish circulation through 9-5/8" X 7" annulus. Circulate -50 bbls dead crude out of well. 11 :00 - 13:30 2.50 STCTPL P DECOMP Displace annulus to hot seawater followed by 100 bbl detergent sweep. Then displace annulus to 9.4 ppg LSND mud .4 bpm @ 950 psi 13:30 - 14:00 0.50 STCTPL P DECOMP Pull 1 stand, MU spear assembly and spear 7" csg. BOLDS 14:00 - 15:00 1.00 STCTPL P DECOMP Pull of to 350k Ibs, establish circulation and work casing pulling up to 375k Ibs. Able to pull csg 3' up hole. 15:00 - 16:30 1.50' STCTPL P DECOMP Attemp to work casing back down. Able to work hanger down to 1.5' above ring. 16:30 - 17:00 0.50 STCTPL P DECOMP Release spear. LD spear assy. 17:00 - 19:00 2.00 STCTPL P DECOMP POH and LD csg cutter assembly. 119:00 - 21:30 2.50 STCTPL P DECOMP PU spear assy and spear 7" csg. Establish circulation, 4 bpm I @ 450 psi. Work casing picking up to 375k Ibs. Work csg 5' uphole. Packing off, no returns. Continue working csg picking up to 400k Ibs and attempting to regain circulation. NO progress. Un spear and LD spear assy. 21 :30 - 23:00 1.50 STCTPL P DECOMP PU csg cutter and RIH to 2915'. 23:00 - 00:00 1.00 STCTPL P DECOMP Rig service, inspect top drive. 11/23/2004 00:00 - 00:30 0.50 STCTPL P DECOMP Pump cutter knives open, RIH and tag csg collar at 2913'. PU l' to 2912' and cut csg. Cut at 2912',53' below 9-5/8" csg shoe. 00:30 - 02:00 1.50 PXA P DECOMP Pump dry job, blow down top drive. POH with csg cutter assy. 02:00 - 02:30 0.50 STCTPL P DECOMP PU csg spear and change out grapple. RIH and spear 7" csg. 02:30 - 03:00 0.50 STCTPL P DECOMP PU to 375k, attempt to establish circulation, packed off. Continue working csg, attempting to circulate. Csg finally came free at 395k Ibs. Establish circulation, 3 bpm @ 300 psi. 03:00 - 03:30 0.50 STCTPL P DECOMP CBU 4 bpm @ 300 psi. 03:30 - 04:00 0.50 STCTPL P DECOMP Pull csg hanger to the rig floor. Rig up csg equipment while circulating, 4 bpm @ 300 psi. 04:00 - 04:30 0.50 STCTPL P DECOMP break out and LD csg spear. Blow down top drive. CO elevators. 04:30 - 05:00 0.50 STCTPL P DECOMP PJSM with all rig personnel on breaking out and laying down csg. 05:00 - 10:30 5.50 STCTPL P DECOMP Pull and UD 69 jts of 7" csg, 29' of cut off jt, casing pup below hanger 10:30 - 11 :30 1.00 STCTPL P DECOMP UD casing equipment, P/U spear, make service breaks, UD spear 11 :30 - 13:00 1.50 CLEAN P DECOMP Clear and clean floor. 13:00 - 14:00 1.00 CLEAN P DECOMP Service rig and topdrive, lubricate and inspect crown. 14:00 - 15:30 1.50 CLEAN P DECOMP Change out saver sub on topdrive. 15:30 - 17:00 1.50 WHSUR P DECOMP Install double valve, flange and gauge on OA annulus. 17:00 - 20:00 3.00 REMCM-P DECOMP P/U 30 jts of 3.5" tubing, RIH with 4" DP, tag EZSV at 3,150', Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11/23/2004 17:00 - 20:00 3.00. REMCM-P DECOMP pull up to 3,143' UD joint of DP. 20:00 - 20:30 0.50 I REMCM-P DECOMP M/U TIW valve and cement hose, CBU 5 bpm @ 300 psi, up WI = 75k, dn WI = 75k, held PJSM with all rig personnel andcementers, while circulating, 20:30 - 21 :00 0.50 REMCM-P ! DECOMP Pump 5 bbls water and test lines to 2,500 psi, pump remaining 13 bbls at 5 bpm @ 360 psi, pump 65 bbls 17 ppg class G cement, 5 bpm 320 psi, pump 2.5 bbls water behind, and displace cement with rig pumps at 5 bpm 250 psi, pumped calculated strokes to balance plug, 15 bbls, 176 strokes. CIP @ 21 :00 hrs. 21 :00 - 21 :30 0.50 REMCM-P I DECOMP POH slowly to 2,174' 21 :30 - 22:30 1.00 REMCM-P i DECOMP M/U topdrive, break circulation @ 1 bpm, increased rate to 6.5 bpm 270 psi circulate hole clean, no cement to surface. 22:30 - 23:30 1.00 REMCM-P DECOMP Pump dry job. POH to 955' 23:30 - 00:00 0.50 REMCM-P DECOMP R/U and lay down 3.5" tubing. 11/24/2004 00:00 - 01 :00 1.00 REMCM-P DECOMP Continue laying down 30 joints 3.5" tubing 01 :00 - 02:00 1.00 REMCM-P DECOMP Rig down tubing handling equipment, Install wear ring, Clean floor 02:00 - 05:00 3.00 I REMCM-P DECOMP Pickup 3 DCs, 14 joints 4" HW, Jars, and 39 jts 4" DP. 05:00 - 06:00 1.00. REMCM-P DECOMP POH stand back 13 stands DP 5 stands HW. 06:00 - 06:30 í 0.50 I REMCM-P DECOMP Make up 8 3/4" milltooth bit, clean floor 06:30 - 07:30 I 1.00 REMCM-P DECOMP RIH with clean out assembly to 1,990' 07:30 - 09:30 I 2.00 REMCM-P DECOMP Circulate @ 1,990' 2 bpm, 130 psi, while wait on cement. 09:30 - 12:00 2.50 REMCM-P DECOMP Wash from 1,990' tag top of cement at 2,203', Drill cement from 2,203' to 2,285', 10-25k wob, 410 gpm, 670 psi, 80 rpm, torque 3-4k, 40-60 fph. 12:00 - 21 :30 9.50 REMCM-P DECOMP Continue drilling cement from 2,285' to 2750' 20-28k wob, 415 I gpm, 700 psi, 80 rpm, torque 4-5k, 40-60 fph. up WI = 95k, dn WI = 85k, rt WI = 90k 21 :30 - 22:00 0.50 REMCM-P DECOMP Circulate bottoms up, 415 gpm @ 700 psi. 22:00 - 23:00 1.00 REMCM-P DECOMP POH with clean out assmbly 23:00 - 00:00 1.00 REMCM-P DECOMP Break bit, stand back DCs. 11/25/2004 00:00 - 03:30 3.50 CLEAN P DECOMP Make up 8 3/4" drilling assembly, orient MWD and motor, PJSM handling sources, load sources and pickup remaining BHA, surface test MWD at 640', flow rate 460 gpm @ 875 psi. 03:30 - 04:30 1.00 CLEAN P DECOMP RIH with 8 3/4" drilling assembly, position Ghost reamers @ +/- 1,000 and +/- 2,000' per directioal driller, continue RIH to 2694' 04:30 - 05:00 0.50 CLEAN P DECOMP Make up topdrive, break circulation, wash from 2,694' to 2,750' 380 gpm 710 psi. 05:00 - 06:30 1.50 CLEAN P DECOMP Drill cement from 2,750' to 2856' 380 gpm, 780 psi, 50 rpm, torque 4500 ftllbs. 80 to 90 fph. 06:30 - 12:00 5.50, STCTPL P DECOMP Time drill off cement plug, from 2,856' to 2,886', 3 fph for 3',5 fph for 10',10 fph for 17' maintaining a 15L toolface, 390 gpm, 1,240 psi on bottom, 1,100 psi off bottom, up WI = 97k, dn WI = 95k 12:00 - 14:30 2.50 STCTPL P DECOMP Continue drilling from 2,886' to 2,932', maintaining 50 psi differential pressure on motor, holding 15 to 20L toolface, began rotating from 2,932' to 2,962', 2k wob, 60 rpm, torque I 4.5k, 425 gpm, 1,400 psi on bottom, 1,280 psi off bottom. '14:30 - 15:30 1.00 STCTPL P DECOMP Displace well to 9.2 ppg LSND mud, @ 425 gpm, 1,260 psi. 15:30 - 16:30 1.00 DRILL P INT1 Pull back inside casing to 2,758', rig up and perform LOT, 2,856 md, 2,828' tvd, mud WI 9.2 ppg, pressure attained 820 psi, EMW 14.7. Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11/25/2004 16:30 - 17:00 0.50 DRILL P INT1 RIH to 2,950' obtain clean hole ECD @ 400 & 600 gpm, 60 rpm, clean hole ECD = 9.53. 17:00 - 21 :00 4.00 DRILL P INT1 Directional drill 8 3/4" hole from 2,962' to 3,463', wob 2-5k, 570 gpm, 1,650 psi on bottom, 1,500 psi off bottom, 60 rpm, torque 5 k on bottom 4.5k off bottom, up wt = 104k, dn wt = 94k, st wt = 100k, ECD = 9.75. When pumping 600 gpm, losing mud over shakers, change screens during connection. While making connection hydraulic hose on topdrive started leaking, 21 :00 - 00:00 3.00 DRILL IN RREP INT1 I POH to 2,789', blow down topdrive, Repair hose on topdrive. 11/26/2004 00:00 - 03:00 3.00 DRILL IN RREP INT1 I Repair topdrive, RIH to 3,463' 03:00 - 12:00 9.00 DRILL Ip INT1 Directional drill 8 3/4" hole from 3,463' to 4,422', wob 2-10k, 570 gpm, 1,830 psi on bottom, 1,730 psi off bottom, 80 rpm, torque 6-7 k on bottom 4-5k off bottom, up wt = 111 k, dn wt = 100k, st wt = 102k, ECD = 9.95 AST = .70 ART = 3.08 12:00 - 22:30 10.50 DRILL P INT1 'Directional drill 8 3/4" hole from 4,422' to 5,480', wob 10-20k, 550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm, torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn wt = 110k, st wt = 120k, ECD = 10.04 calculated clean hole ECD = 9.54 22:30 - 23:30 1.00 DRILL P INT1 Pump 20 bbllow vis sweep, followed by 20 bbl high vis weighted (10.2 ppg) sweep at 550 gpm 1,990 psi, rotating string 100 rpm, 4.5k torque, pumped sweep in order to keep ECD at or below the .60 ppg over clean hole limit through this section. 23:30 - 00:00 0.50 DRILL P INT1 Directional drill 8 3/4" hole from 5,480' to 5,495', wob 10-20k, 550 gpm, 2,250 psi on bottom, 1,990 psi off bottom, 100 rpm, I torque 6-7 k on bottom 5-6k off bottom, up wt = 130k, dn wt = 110k, st wt = 120k, ECD = 9.92 calculated clean hole ECD = 9.48 ART = 3.55 AST = .90 11/27/2004 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8 3/4" hole from 5,495' to 6,125", wob 2-1 Ok, 550 gpm, 2,100 psi on bottom, 1,900 psi off bottom, 100 rpm, torque 6-7 k on bottom 5-6k off bottom, up wt = 135k, dn wt = 115k, st wt = 125k, ECD = 9.90 when sliding 10.04 when rotating. Having to cycle pumps several times to get survey, clean suction screens and check pulsation dampner pressure on both pumps during connection, seemed to help. Continue to backream slowly on connections to keep ECD within set parameters. I .ART= 1.35 AST = 5.72 I 12:00 - 18:30 6.50 DRILL P INT1 Directional drill 8 3/4" hole from 6,125' to 6,485', wob 5-15k, 565 gpm, 2,240 psi on bottom, 2,110 psi off bottom, 100 rpm, torque 8-9 k on bottom 7-8k off bottom, up wt = 130k, dn wt = 107k, st wt = 116k, ECD = 10.0. Developed leak on topdrive gear box oil cooler. ART = .64 AST = 3.46 18:30 - 19:30 1.00 DRILL N RREP INT1 Blow down topdrive, made up circulating head, circulate @ 50 gpm, 240 psi, while trouble shooting problem. Decision was made to pull to shoe to make repairs. Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 11/27/2004 19:30 - 22:00 2.50 DRILL N RREP INT1 POH from 6,485' to 2,866', pulled 20k over at 5,652' wiped through one time, no excess drag pulling back through, pulled to the shoe with no problems. hole took proper fill. 22:00 - 00:00 2.00 DRILL N RREP INT1 Remove oil cooler from topdrive,take to shop for repairs, clean oil from topdrive and windwalls, clean floor. 11/28/2004 100:00 - 02:00 2.00 DRILL N RREP INT1 Clean rig floor and topdrive, unable to repair oil cooler bypass I cooler, fill gear box with oil took 10 gallons to fill. Test run topdrive and check for leaks. 02:00 - 03:30 1.50 DRILL IN RREP INT1 RIH from 2,866' to 6435' no problem filled pipe @ 5,580' 03:30 - 03:45 0.25 DRILL Ip INT1 Make up Topdrive, break circulation, ream from 6,435' to 6,485' no fill 03:45 - 09:00 5.25 DRILL P INT1 Directional drill 8 3/4" hole from 6,485' to 6,880', 5-7k wob, 545 gpm, 2,340 psi on bottom, 2,240 psi off bottom, 100 rpm, 8-9k torque on bottom, 6-7k off bottom, up wt = 135k, dn wt = 100k st wt = 112k, ECD = 9.92. At bottoms up saw some trip gas LEL 80 ppm. ART = 1.55 AST = 1.11 09:00 - 09:30 0.50 DRILL P INT1 Circulate bottoms up @ 545 gpm, 2,400 psi, 100 rpm, 8-9k torque, reciprocate full stand. 09:30 - 13:00 3.50 DRILL P INT1 MAD pass from 6,880' to 5,872', pumping 550 gpm, 2,400 psi, .100 rpm, 8k torque, 600 fph. 13:00 - 13:30 0.50 DRILL P INT1 RIH fro 5,872' to 6,880' no problem going in hole. 13:30 - 15:00 1.50 DRILL P INT1 Pump 20 bbllow vis sweep, 20 bbl high vis weighted sweep, 575 gpm, @ 2,600 psi, 110 rpm, 9k torque, sweep brought back a significant amount of cuttings. 15:00 - 19:00 4.00 DRILL P INT1 Monitor well, POH to BHA no hole problems, monitor well at BHA 19:00 - 22:00 3.00 DRILL P INT1 Rack back HW and jars, RIB DCs, PJSM handling sources, remove sources, down load MWD, UD bit motor and MWD. 22:00 - 23:30 1.50 DRILL P INT1 Clear floor of all directional tools, clean floor 23:30 - 00:00 0.50 EVAL P INT1 Remove snow from pipe shed ramps, load MDT logging tools in pipe shed. 11/29/2004 00:00 - 00:30 0.50 EVAL P INT1 Continue loading pipe shed with Schlumberger MDT tools 00:30 - 01 :00 0.50 EVAL P INT1 PJSM with all rig personnel, Co Rep, Toolpusher, Schlumberger crew, picking up logging tools. 01 :00 - 03:00 2.00 EVAL P INT1 Make up MDT logging tools per Schlumberger representative. 03:00 - 03:30 0.50 EVAL P INT1 Latch up docking head and test logging tools. Rig up wire line sheave in derrick, make up xo to logging tools. 03:30 - 10:00 6.50' EVAL P INT1 RIH with MDT tools on 4" DP 1 min per/ stand fill DP @ 2,859', fill every 5 stands in open hole, RIH to 5,293' 10:00 - 12:00 2.00 EVAL P INT1 Pickup single of 4" DP, make up xo's and side entry sub, RIH with e-line, pumping @ 20 gpm to latch up head. Up wt = 105k, dn wt = 90k. 12:00 - 12:30 0.50 EVAL P INT1 Test MDT tool string, and side entry sub packoff. 12:30 - 00:00 11.50 EVAL Ip INT1 Logging with Schlumberger, taking pressure samples as directed by on site Geologist. took a total of 31 samples, 22 attempts failed due to lost seal or dry sample. The 9 samples that were recorded were from the following depths. Up wt = 140k, Dn wt = 100k. Mb1 - 5,531' Mc - 5,728' Mc - 5,747' Printed: 2n/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 11/29/2004 12:30 - 00:00 11.50 EVAL P INT1 Nb - 5.849 OA - 6,000' OA - 6,060' OBb - 6,235' OBb - 6,247' OBd - 6,820' 11/30/2004 00:00 - 22:00 22.00 EV AL P INT1 - Run MDT logs taking fluid samples @ depths per on-site Geologist. Good fluid samples @ 8 of 11 stations. 6824' - good sample in OBd 6117' - good sample in OBa 6000' - good sample in OA 6496' - no good - OBc 6490' - no good - OBc 6424' - no good - OBc 6403' - good sample in OBc 6247' - good sample in OBd 6060' - good sample in OA 5748' - good sample in Mc 5532' - good sample in Mb1 i-Rig crew trained on vacuum system usage while logging. - Full derrick inspection completed. - RA tags inserted in cementralizers on 4 jts of 7 5/8" casing. 22:00 - 22:30 0.50 EVAL P INT1 - POH to 5293'. 22:30 - 00:00 1.50 EVAL P INT1 - R/D side entry sub & XO's. 12/1/2004 100:00 - 00:30 0.50 EVAL P INT1 - Break circ - monitor well. - Pump dry job - B/D TD. 00:30 - 03:00 2.50 EVAL P INT1 - POH to logging tools. 03:00 - 05:30 2.50 EVAL P INT1 - B/O & UD logging tools. 05:30 - 06:00 0.50 EVAL P INT1 - Clear & clean rig floor. 06:00 - 08:00 2.00 EVAL P INT1 - M/U clean out BHA consisting of: 8 3/4" FDS+VC mill tooth bit, NB stab w/ float, PWD, MWD, NM XO, NM spiral DC, NM stab, 2 NM spiral DC's, float / saver sub, jars, XO & 14 jts HWDP. - RIH to 830' & shallow test MWD. 450 GPM - 650 psi. 08:00 - 09:00 1.00 EVAL P ilNT1 - RIH w/ BHA on 4" DP to 2821' & fill pipe. 09:00 - 10:00 1.00 EVAL P INT1 - PJSM - slip & cut 85' drilling line. 10:00 - 10:30 0.50 EVAL P INT1 - Service & lubricate rig. 10:30 - 11 :00 0.50 EVAL P INT1 - RIH w/ BHA on 4" DP to 3495'. 11 :00 - 11 :30 0.50 EVAL P INT1 - CBU @ 400 GPM, 770 psi, 40 RPM. - B/D TO. 11 :30 - 14:00 2.50' EVAL P INT1 - RIH to TD @ 6880' washing down last 90' & breaking circ @ 5000'. P/U wt 145K, 5/0 wt 95K on bottom - Washed & worked through tight spots @ 6063',6120',6250' & 6821'. 14:00 - 16:30 2.50 EV AL P INT1 - Pump & circ around 20 bbllow- vis weighted sweep followed by 20 bbl hi-vis sweep @ 600 GPM, 2540 psi, 120 RPM. CBU x 3. - Monitor well - spot lube-tex pill & pump dry job. 16:30 - 19:30 3.00 EVAL P INT1 - POH w/ clean out assy to BHA - hole slick. 19:30 - 21 :30 2.00 EVAL P INT1 - UD BHA & clear floor. BOPsu1 P - Drain stack. 21 :30 - 22:00 0.50 INT1 - Pull bowl protector & install test plug. I i Printed: 21712005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1211/2004 22:00 - 00:00 2.00 CASE P INT1 - PJSM - CIO upper pipe rams to 7 5/8" . - Bring 7 5/8" casing tools to rig floor. 12/2/2004 00:00 - 00:30 0.50 CASE P INT1 i-Test door seals to 1,000 psi for 5 min. - RID test equip't. 00:30 - 01 :30 1.00 CASE P INT1 - Make dummy run wI casing hanger on LJ. - R/U to run casing. - Dropped 200T slip segment downhole. 01 :30 - 02:30 1.00 FISH N HMAN INT1 - Discuss options wI Baker, Schlumberger, & Anchorage. Decision to attempt segment retrieval wI slickline & magnet. 02:30 - 03:30 1.00 FISH N HMAN INT1 - Wait on slickline unit to arrive from DS 15. 1- UD casing tools, set bowl protector, P/U & install short bails & 4" elevators. , 03:30 - 05:30 2.00 FISH N HMAN INT1 ,- Prepared rig floor for slickline equip't. - MIU Baker tools - 8" magnet & 3 XO's to 3/4" sucker rod conn. - Spot slickline unit & load tools in pipeshed. 05:30 - 08:00 2.50 FISH N HMAN INT1 - PJSM - R/U slickline unit wI lubricator for pressure control. 08:00 - 14:30 6.50 FISH N HMAN INT1 - RIH wI magnet - tagged up @ 2831' WLM & slowly POH - No fish. - RIH to 2851' & tagged up - Pushed fish to 2854' & set down @ 2854' x 3. POH - no fish. - RIH to 2854' & tagged fish. Pushed & worked fish to 3092'. POH wI indication of fish on magnet until 2811'. Lost weight. RIH & tagged up @ 2811'. Could not work past 2811'. POH - no fish. - RIH & tagged up @ 2820'. Slowly worked magnet - fish moving downhole. Tagged up @ 3120' - POH wI good indication of fish on magnet. Lost fish @ 2958'. RIH to 3250' & I tag fish. POH wI good indication of fish & lost fish @ 2932'. RIH & tagged fish @ 3000' & POH to 2932' losing fish @ 2932' x 5. POH wI Slickline, No Recovery. 14:30 - 15:30 1.00, FISH N HMAN INT1 - CIO slickline assy to LIB. RIH & pushed fish to 3330' in attempt to obtain impression of fish. POH & UD LIB wI slight impression of fish, nothing conclusive. 15:30 - 17:30 2.00 FISH N HMAN INT1 - MIU grabber tool assy & RIH. Push fish to 3800' & attempt to 1.001 FISH latch fish. Hole getting sticky - POH - no fish. 17:30 - 18:30 N HMAN INT1 - PJSM - RID slickline. 18:30 - 20:30 2.00 I BOPSUP P INT1 - PJSM - drain stack, pulled bowl protector & installed test plug. - CIO top pipe rams from 7 5/8" to 3 1/2" x 6" variables. 20:30 - 21 :00 0.50 BOPSUF P INT1 - PJSM - R/U test equip't. 21 :00 - 00:00 3.00 BOPSUP P INT1 - Test BOPE per BP & AOGCC regs to 250 13500 psi for 5/5 min. Witness of test waived by AOGCC Rep Chuck Scheve. 12/3/2004 00:00 - 01 :00 1.00 BOPSUF P INT1 - RID BOPE test equip't, BID choke & kill lines, pulled test plug & installed bowl protector. 01 :00 - 04:00 3.00 FISH N HMAN INT1 - PIU & MIU BHA # 10 for pushing junk to bottom consisting of: 85/8" "metal muncher" bladed mill, boot basket, bit sub, oil jars, XO, 3 61/4" DC's, 2 XO's & 12 jts HWDP. 04:00 - 08:30 4.50 FISH N HMAN INT1 - Thaw out kelly hose. - B/O kelly hose @ standpipe gooseneck & thaw ice plug wI steam hose. P/U & MIU kelly hose. 08:30 - 10:30 2.00 FISH N HMAN INT1 - RIH wI clean out assy on 4" DP to 2850' & broke circ. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1213/2004 08:30 - 10:30 2.00 FISH N HMAN INT1 - RIH from 2850' to 3600' & broke circ 3 BPM 500 psi. After pumping 10 bbls pressure increased to 2000 psi. Bled off & attempted to pump - pressure increased to 2500 psi. Bled off : pressure, checked surface system - system clear. Drill string I plugged off. 10:30 - 12:00 1.50 FISH N HMAN INT1 - Attempted to unplug drill string wlo success. POH to 2800' & attempted to unplug drill string wlo success. 12:00 - 14:00 2.00 FISH N HMAN INT1 - POH wet wI 4" DP to BHA. 14:00 - 15:00 1.00 FISH N HMAN INT1 - BID BHA & cleaned out plugged mill. 15:00 - 16:00 1.00 FISH N HMAN INT1 - MIU BHA for pushing junk to bottom. 16:00 - 17:30 1.50 FISH N HMAN INT1 - RIH wI clean out assy on 4" DP to 3600' filling @ 2850'. 117:30 - 18:00 0.50 I FISH N HMAN INT1 - CBU @ 3600'.550 GPM 1300 psi. 18:00 - 21 :30 3.50 FISH N HMAN INT1 - RIH from 3600' @ 1.5 min per stand & tag fish w/20K @ 5687'. Stack 20K x 3, & 30K x 2 in attempt to move fish. P/U 15' & break circ. - Stack 20K x 2 on fish wI pumps on - 650 GPM, 2220 psi - no movement. - Circulate on top of fish wI no wt on mill for 30 min - 700 GPM, 2630 psi - P/U & rotate 10, 20, & 60 RPM wI different wts. on mill from 1 to 15K. Ion junk Tq 2 to 3K higher than off bottom Tq. P/U wt 135K, ,S/O wt 105K, Rot wt 117K. - WOM 10K, 10 RPM, pump rate 700 GPM, 2630 psi, Tq 5K. Mill torqued up, fish fell down hole. Worked stand x 2 wI no drag. 21 :30 - 22:30 1.00 FISH N HMAN INT1 - RIH from 5687' to 6632'. 22:30 - 00:00 1.50 FISH N HMAN INT1 - Tag fish @ 6632' w/20K. PIU & stack 50K on fish x 5 - no I movement. I - Circulate on top of fish wI no wt - 700 GPM 2850 psi for 15 min. - Mill on fish w/5K WOM, 10 RPM, off bottom Tq 4K, on bottom Tq 7 to 9K, 700 GPM 2850 psi. - Push fish from 6632' to 6640'. 12/4/2004 00:00 - 01 :00 1.00 FISH N HMAN INT1 - Milled & washed on fish from 6640' to 6880'. WOM 10K, 10 RPM, TQ 7-9K, pump pressure 2160 psi @ 600 GPM. 01 :00 - 03:00 2.00, FISH N HMAN INT1 - At TD stack 50K to 60K wt on fish x 5.600 GPM 2150 psi - Mill new hole from 6880' to 6885'. WOM 5K to 14K, 100 RPM, Tq 7 - 8K, 600 GPM 2180 psi. - Work string from 6885' to 6865' x 10. 03:00 - 05:00 2.00 FISH N HMAN INT1 - Pumped 20 bbllow-vis weighted sweep followed by 20 bbl hi-vis sweep & CBU x 3.600 GPM 2150 psi 120 RPM. - Monitored well. 05:00 - 06:00 1.00 FISH N HMAN INT1 - Pump lube pill - pump dry job - BID equip't. 06:00 - 06:30 0.50 FISH N HMAN INT1 - POH from 6885' to 6632'. - Pulled tight wI 40K overpull. 06:30 - 13:30 7.00 FISH N HMAN INT1 - Attempted to RIH from 6632' wlo success. Stacked 50K on mill & engaged pumps, 610 GPM 2050 psi. Could not rotate pipe. Continued to work pipe & obtained rotation wI 20 RPM, Tq 5 - 20K. Worked string. - Backreamed out of hole fromm 6632' to 6435' @ 120 RPM, 610 GPM 2000 psi. Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1214/2004 06:30 - 13:30 7.00 I FISH N HMAN INT1 · Hung up @ 6434' . pump rate 610 GPM, 2000 psi. Could not I rotate. Worked drill string & jarred up wI 50K overpull x 4. I - Obtained rotation & backreamed out of hole dragging fish from 6434' to 5477'. · Lost drag @ 5500', POH from 5479' to 5380' wI no drag. 13:30 . 15:30 2.00 FISH N HMAN INT1 · BID TD. - POH from 5380' to BHA pulling slowly through 9 5/8" shoe wI no drag. 15:30 - 17:30 2.00 FISH N HMAN INT1 - POH, clean & B/O BHA. 17:30 - 18:30 1.00 FISH N HMAN INT1 - Clear & clean floor. Loaded new BHA tools & brought to rig floor. 18:30 . 19:00 0.50 FISH N HMAN INT1 - Service TD. 19:00 . 19:30 0.50 FISH N HMAN INT1 - Loaded additional collars in pipeshed & brought additional mills to rig floor for current BHA. 19:30 - 21 :30 2.00 FISH N HMAN INT1 - MIU BHA consisting of: 8 1/8" tapered mill, 8 3/8" string mill, XO, float sub, NM spiral DC, XO, 8 3/8" string mill, XO, NM spiral DC, 8 1/2" string mill, oil jars, NM spiral DC, XO, 3 DC's, 2 XO's & 12 jts 4" HWDP. 21 :30 - 00:00 2.50 FISH N HMAN INT1 - RIH to 5005'. Filled pipe @ 2800'. 12/5/2004 00:00· 01 :00 1.00 FISH N HMAN INT1 - RIH from 5005' to 5775'. Filled pipe @ 5200'. · No drag while running in hole wI S/O wt 105K. At 5775' picked up stand to check drag on upstroke & tagged junk wI 25K overpull @ 5695'. .01 :00 - 02:30 1.50 FISH N HMAN INT1 · Backream stand from 5775' to 5679 x 3 - 60 RPM, 600 GPM, I 2280 psi. · Increase rotary to 100 RPM & backream stand from 5775' to 5679' x 7. Shut off rotary & pumps & work stand - no drag up or down. - Rack back stand & check drag on upstroke from 5679' to 5583', No drag. - RI H to 5871' - PIU from 5871' to 5775' to check for drag. No drag 02:30 - 03:30 1.00 FISH N HMAN INT1 - RIH from 5871' to TD @ 6885' wI no problems. Checked for drag from 6542' to 6446', 6736' to 6639', & from 6885 to 6832'. 03:30 . 05:00 1.50 FISH N HMAN INT1 - Pumped 20 bbllow vis weighted sweep followed by 20 bbl hi-vis sweep & circulate surface to surface & additional B/U. 05:00 - 06:30 1.50 FISH N HMAN INT1 - Monitor well - POH from 6885' to 5200' wI no drag. Monitor well - static. Pump dry job & BID TD. 06:30 - 10:00 3.50 FISH N HMAN INT1 - POH wI 4" DP to BHA - no drag. 10:00 - 12:30 2.50 FISH N HMAN INT1 - B/O & UD BHA. 12:30 - 13:00 0.50 FISH N HMAN INT1 - Cleared & cleaned rig floor. 13:00 - 13:30 0.50 BOPSUF N HMAN INT1 - PJSM - drained stack, pulled bowl protector & installed test plug. 13:30 . 15:00 1.50 BOPSUP N HMAN INT1 - C/O upper rams to 7 5/8". - Tested door seals to 1 000 psi. , - Pulled test plug. 15:00 - 15:30 0.50 CASE N HMAN INT1 - PJSM for rigging up & running casing. 15:30 - 17:00 1.50 CASE N HMAN INT1 - R/U 7 5/8" casing handling equip't. 17:00 - 20:00 3.00 CASE P INT1 - MIU & run 33 jts. 7518" 29.7# L-80 STL FJ casing. - Bakerlok connections on pin end of jts 2 & 3. Broke circulation & checked floats - floats holding. MIU to 5200 ftllbs Tq and utilizing Jet Lube Seal Guard thread compound on Printed: 217/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1215/2004 17:00 - 20:00 3.00 CASE P INT1 connections. 120:00 - 21 :00 1.00 CASE N SFAL INT1 - Dropped casing jts between pit complex & pipeshed. Secure I area & stand down for safety. Discuss & review incident wI all I crew members. 21 :00 - 22:30 1.50' CASE N SFAL INT1 - Reposition casing in yard to facilitate loading ODS portion of pipeshed & load casing. 22:30 - 00:00 1.50 CASE P INT1 - Run 75/8" 29.7# L-80 STL FJ casing to 2112' filling every jt via Frank's fill up tool. 12/6/2004 00:00 - 01 :30 1.50 I CASE P INT1 - Run 7 5/8" 29.7# L-80 STL FJ casing to 2839' filling every jt I wI Frank's fill up tool. I - MIU to 5200 ftllbs Tq. & utilizing Jet Lube Seal Guard thread compound on connections. i 01 :30 - 02:00 0.50 CASE P INT1 - CBU x 2 @ 95/8" casing shoe. 4 - 5 BPM wI no losses. I - 4 BPM 370 psi, 5 BPM 400 psi. - P/U wt 115K, SIO wt 11 OK. 02:00 - 10:30 8.50 CASE P INT1 - Continue running 75/8" 29.7# STL FJ casing into OH @ 60 sec I jt breaking circulation every 20 jts. Running speed 6 min per jt while breaking circulation. - Wash last jt down @ 5 BPM 640 psi. - Ran a total of 167 jts, 2 19.9' & 2 10' pup jts. RA tags @ 6703',6346',6062' & 5940'. 10:30 - 11 :00 0.50 CASE P INT1 - B/O & UD Frank's tool - MIU cement head. 11 :00 - 13:00 2.00 CEMT P INT1 - Staged up pumps - circ & cond mud @ 2 BPM 330 psi, 4 BPM 530 psi & 5 BPM 590 psi. - Reciprocated 5' while circulating. Took 350K to obtain pipe movement - P/U wt 225K, SIO wt 127K after initial movement. - Held PJSM wI Rig Crew, Cementers, Truck Drivers, Mud Eng, Tool Pusher & Co. Rep while circulating. 13:00 - 15:00 2.00 CEMT P INT1 - Pumped 5 bbls fresh water & tested lines to 4,000 psi. Pumped 20 bbls CW 100 @ 4 BPM 600 psi followed by 30 bbls 10.2 ppg Mud Push @ 4.5 BPM 650 psi. Dropped bottom plug & pumped 49 bbls (229 sx) 15.8 ppg Class G cement. Dropped top plug and pumped 10 bbls fresh water via Cementers @ 5 BPM 290 psi. - Switched over to rig pump & displaced wI 301.8 bbls Seawater at following rates: Pumped Rate Pressure 50 bbls 5bpm 300 psi 1 00 bbls 5bpm 400 psi 150 bbls 5bpm 450 psi 200 bbls 5bpm 475 psi 250 bbls 5 bpm 550 psi Slowed Rate to 3 bpm wI 292 bbls pumped. Bumped plug wI 1,900 psi & held pressure for 3 min. - Bled off pressure & checked floats - floats held. - CIP 1500 hrs. 15:00 - 16:30 1.50 CEMT P INT1 - RID cement equip't & cleared floor. - CIO bails & elevators. 16:30 - 17:00 0.50 CASE P INT1 - PJSM - Installed 9 5/8" x 7 5/8" packoff & tested to 5,000 psi for 10 min. Good test. 17:00 - 19:30 2.50 BOPSUP P INT1 - PJSM - Installed test plug & CIO upper rams from 7 5/8" to 3 1/2" x 6" variables. - RIU test equip't & tested door seals to 1,000 psi - RID test Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1216/2004 17:00 - 19:30 2.50 BOPSUF P INT1 equip't & pulled test plug. 19:30 - 20:00 0.50 CASE P INT1 . Serviced TD. 20:00 - 21 :00 1.00 DRILL P PROD1 - Load BHA tools on floor. - MIU 63/4" BHA - 6 3/4" PDC bit, mud motor dialed in to 1.5 deg bend & 6 3/4" stab. 21 :00 - 00:00 3.00 DRILL N ¡DPRB PROD1 . - RIH & tag up @ 27.7' wI PDC bit. POH & inspect bit. - RIH & tag up @ 27.7' - Apply 5K wt to bit - no go. Apply 5K wt to bit @ 5 RPM - no go. - Change setting on motor to 0 deg bend & RIH - no go - POH & remove bit. RIH wI motor & 65/8" sleeve on motor & able to RIH to 31' wlo tagging up. 12/7/2004 00:00 - 01 :00 1.00 DRILL N DPRB PROD1 Attempt to RIH wI two different PDC bits & tagged up @ 27.7'. 01 :00 - 02:30 1.50 DRILL P PROD1 PJSM - Line up to OA & test line to 3000 psi. Pumped 50 bbls mud down annulus @ 1 BPM. SPM Pressure Total stks 12 630 120 12 610 180 12 660 240 13 720 300 13 720 360 13 710 420 13 700 480 13 700 540 13 700 588 02:30 - 03:00 0.50 DRILL N DPRB PROD1 UD drilling BHA. 03:00 - 04:00 1.00 DRILL N DPRB PROD1 MU 6-3/4" string mill with a stabilizer and a 6-1/4" DC. 04:00 - 04:30 0.50 FISH IN DPRB PROD1 Mill through obstruction @ 27.7'. Milled for - 6" & cleaned up I area. Ran mill wlo rotatating to 167' to ensure clear below. 04:30 - 05:00 0.50 DRILL IN DPRB PROD1 UD milling BHA. 05:00 - 07:30 2.50 DRILL P PROD1 RU test equipment. Close blind rams and test csg to 3500 psi for 30 minutes. Bleed pressure, open rams and RD test equipment. 07:30 - 10:30 3.00 DRILL P PROD1 PU and MU 6-3/4" directional BHA #14 10:30 - 14:30 4.00 DRILL P PROD1 RIH to 2250' with 6-3/4" directional BHA. Shallow test MWD @ 685'. SymOps: PJSM. RU Little Red to 7-5/8" X 9-5/8" annulus. Test lines to 3000 psi. Inject 45 bbls dead crude to freeze protect. IPR 2 bpm @ 1500 psi FPR 2 bpm @ 1500 psi. Shut in with 950 psi, pressure bled to 250 psi by midnight 14:30 - 16:00 1.50 DRILL P PROD1 Change out saver sub and service top drive. 16:00 - 21 :00 5.00 DRILL P PROD1 Continue RIH from 2250' to 6050' picking up DP from pipe shed 21 :00 - 22:00 1.00 DRILL P PROD1 Cut and slip 60' of drill line. 22:00 - 22:30 0.50 DRILL P PROD1 Circulate a drill string volume to ensure DP free of obstructions. 22:30 - 23:30 1.00 DRILL P PROD1 RIH from 6050' to 6625'. MU top drive and wash last stand down down, tagged up on cement stringers @ 6740' 23:30 - 00:00 0.50 DRILL P PROD1 Wash and ream down from 6740' cleaning up cement stringers. 12/8/2004 00:00 - 01 :30 1.50 DRILL P PROD1 Continue washing and reaming down to 6781' cleaning up Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1218/2004 00:00 - 01 :30 1.50 DRILL P PROD1 cement stringers to the float collar. 01 :30 - 02:00 0.50 DRILL P PROD1 PJSM with Veco and all rig personnel on displacing to MOBM. 02:00 - 03:00 1.00 DRILL P PROD1 Pump 20 bbl L VT spacer followed by MOBM to displace well to 9.2 ppg MOBM, 215 gpm @ 1000 psi 03:00 - 05:00 2.00 DRILL P PROD1 Circulate surface to surface X 2 to shear and warm MOBM. 330 gpm @ 2500 psi. 05:00 - 08:00 3.00 DRILL P PROD1 Drill shoe track cement from 6781' to 6870'. Clean out 8-3/4" rathole from 6870' to 6885' and drill 23' of new hole to 6908' WOB = 5 klbs RPM Surf= 50, DH = 225 GPM = 285 @ 2100 psi on Btm Torque = 3k FtLbs 08:00 - 09:30 1.50 DRILL P PROD1 PJSM. Break off stand and pull bit inside 7-5/8" csg. Perform 10.5 ppg EMW FIT, 411 psi surf pressure at 5265' TVD with 9.0 ppg mud in the hole. I Baseline ECD = 9.89 ppg 09:30 - 14:00 4.50 DRILL P , PROD1 Directional drill from 6908' to 7197'. sliding as required to maintain inclination and azimuth. WOB = 3-5 klbs i RPM Surf= 80, DH = 260 ¡ GPM = 330 @ 2900 psi on Btm, 2570 psi off Btm P/U 125k S/O 97k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Calculated ECD = 10.09 ppg Actual ECD = 10.45 ppg 14:00 - 15:00 1.00 DRILL P I PROD1 POH to 7033' and RIH picking up 30' surveys to 7197 15:00 - 00:00 9.00 DRILL P .PROD1 Directional drill from 7197' to 7869', sliding as required to maintain inclination and azimuth. WOB = 3-5 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3100 psi on Btm, 2800 psi off Btm P/U 125k S/O 90k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30' Calculated ECD = 10.10 ppg Actual ECD = 10.47 ppg ART last 24 hrs. =2.23 hrs. AST last 24 hrs. = 4.33 hrs. Total drilling hours = 6.56 hrs 12/9/2004 00:00 - 00:00 24.00 DRILL P PROD1 Directional drill from 7869' to 9851', sliding as required to maintain inclination within constraints provided by rig site geologist to maximize reservoir contact. Printed; 2/7/2005 9;37;45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/9/2004 00:00 - 00:00 24.00 I DRILL P PROD1 WOB = 4-7 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3320 psi on Btm, 3120 psi off Btm Torque = 7k FtLbs on Btm, 6k FtLbs of Btm P/U 135k S/O 85k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Circulate lo-vis and weighted sweeps as required to ensure clean hole conditions. Calculated ECD = 10.23 ppg Actual ECD = 10.47 ppg 12/10/2004 00:00 - 00:00 24.00 DRILL P ART last 24 hrs. = 5.92 hrs. AST last 24 hrs. = 2.93 hrs. Total drilling hours = 8.85 hrs PROD1 Directional drill from 9851' to 11708', sliding as required to maintain inclination within constraints provided by rig site geologist to maximize reservoir contact. WOB = 4-11 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3550 psi on Btm, 3200 psi off Btm Torque = 7-8k FtLbs on Btm, 6-7k FtLbs of Btm P/U 132k S/O 75k ROT 107k I Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Circulate sweeps as required to ensure clean hole conditions. Calculated ECD = 10.82 ppg Actual ECD = 11.02 ppg 12/11/2004 100:00 - 05:00 5.00 DRILL P ART last 24 hrs. = 3.93 hrs. AST last 24 hrs. = 4.50 hrs. Total drilling hours = 8.43 hrs PROD1 Directional drill from 11708', to TD of lateral #1 at 12190' sliding as required to maintain inclination within constraints provided by rig site geologist to maximize reservoir contact. WOB = 3-6 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3730 psi on Btm, 3240 psi off Btm Torque = 8k FtLbs on Btm, 7.5k FtLbs of Btm P/U 144k S/O 70k ROT 109k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.91 ppg Actual ECD = 11.30 ppg ART last 24 hrs. = 1 .10 hrs. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/11/2004 00:00 - 05:00 5.00 DRILL P PROD1 AST last 24 hrs. = 0.90 hrs. Total drilling hours = 2.00 hrs 05:00 - 07:30 2.50 DRILL P PROD1 CBU X 2, to circulate and condition hole. RPM = 80 1330 gpm @ 3200 psi. ilntial ECD = 11.25 ppg Final ECD = 11.10 ppg Calculated ECD = 10.91 ppg 07:30 - 09:30 2.00 DRILL P PROD1 POH for wiper trip to csg shoe from 12190' to 11703', 35 klbs drag and swabbing 09:30 - 17:00 7.50 DRILL P PROD1 MU top drive and backream out from 11703' to 6813'. RPM = 80 GPM = 330 @ 3000 psi I Torque = 8-10k FtLbs i 17:00 -18:00 I 1.00 DRILL P PROD1 CBU X 2 at the 7-5/8" csg shoe. 118:00 - 19:00 1.00 DRILL P PROD1 Service top drive, blocks, crown, drawworks and iron roughneck. 19:00 - 22:00 3.00 DRILL P PROD1 RIH to 12096' filling DP every 20 stands. Work through tight spots from 11710' to 12096' 22:00 - 23:00 1.00 DRILL P PROD1 MU top drive and wash last stand to bottom at 12190' 23:00 - 00:00 1.00 DRILL P PROD1 Pump a 20 bbllo-vis sweep followed by a 20 bbl weighted sweep. RPM = 80 330 gpm @ 3300 psi. 12/12/2004 00:00 - 02:00 2.00 I DRILL P PROD1 Continue circulating BU X 3 to clean and condition hole. RPM = 80 330 gpm @ 3780 psi. Intial ECD = 11.45 ppg Final ECD = 11.19 ppg Calculated ECD = 11.17 ppg I SymOps: I PJSM. Transfer MOBM from pit module to 400 bbl upright IPROD1 tanks. 02:00 - 02:30 0.50 DRILL P PJSM with MI, Veco and all rig personnel on displacing well to I SFMOBM. 02:30 - 04:00 1.50 DRILL P PROD1 I Displace well to Solids Free MOBM. I rate 285 gpm @ 2970 psi 04:00 - 10:30 6.50 DRILL P PROD1 Monitor well - static. POH from 12190' to 6520' to run 4-1/2" liner. Worked through 7-5/8" csg shoe at 6870'. Recorded PI U and S I 0 Weights every 1,000'. Circulated bottoms up at csg shoe, 330 gpm 2,500 psi, RPM 60. 10:30 - 13:30 3.00 DRILL P PROD1 MAD pass from 6520' to 5900' to verify placement of RA tags in 7-518" csg. 13:30 - 17:00 3.50 DRILL P PROD1 Continue POH from 5951 to 208'. Recorded PI U and S I 0 Weights every 1,000'. 17:00 - 17:30 0.50 DRILL P PROD1 PJSM with Anadrill and all rig personnel on pulling RA sources and laying down the BHA. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: Spud Date: 12/29/2000 End: 2/3/2005 11/19/2004 2/3/2005 9ES 12/12/2004 17:30 - 20:00 2.50 DRILL P 20:00 - 21 :00 1.00 DRILL P 21 :00 - 21 :30 0.50 CASE P 21 :30 - 22:00 0.50 CASE P 22:00 - 00:00 2.00 CASE P 00:00 - 05:00 5.00 I CASE P ! 05:00 - 06:00 1.00 CASE 06:00 - 07:30 1.50 CASE P 07:30 - 08:00 0.50 I CASE P 08:00 - 12:00 I 4.00. CASE P 12:00 - 13:30 1.50 CASE P PROD1 PROD1 PROD1 PROD1 12/13/2004 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 I 13:30 - 16:30 16:30 - 17:00 I 17:00 - 17:30 17:30 - 18:30 18:30 - 22:00 22:00 - 00:00 12/14/2004 00:00 - 05:30 05:30 - 06:30 3.00 ¡ CASE P 0.50 CASE P 0.50 CASE P 1.00 CASE P 3.50 STWHIP P 2.00 STWHIP P 5.50 STWHIP P 1.00 I STWHIP P I i PROD1 PROD1 PROD1 PROD1 WEXIT WEXIT WEXIT WEXIT 06:30 - 09:00 2.50 STWHI P P WEXIT 09:00 - 15:00 6.00 STWHIP P WEXIT LD BHA #14, Clear floor and remove RA sources. I Clean and clear rig floor. , Rig up to run 4-1/2" liner PJSM with Baker and all rig personnel on picking up and running 4-1/2", 12.6#, IBT-M, L-80 liner. PU and RUN 4-1/2", 12.6#, L-80, IBT-M slotted liner. Continue PU and RUN 4-1/2", 12.6#, L-80, IBT-M slotted liner. Ran 127 jts slotted liner, 10 jts solid liner, average MU torque 2200 FtLbs. A free floating 5-3/4" centralizer was run on each joint, except the shoe joint. MU seal bore extension, ZXP liner top packer and liner hanger with liner running tool. RD 4-1/2" tbg equipment. RIH with 4-1/2" liner on DP to 7-5/8" csg shoe @ 6870. Circulate 1-1/2 X the string volume. 6 bpm @ 880 psi Continue RIH with 4-1/2" liner on DP, break circulation every 15 'stands. Record P/U and SIO weights every 500'. I MU top drive and break circulation. Drop setting ball. RIH and tag up at 12190'. PU and space out liner top at 6446, shoe at 12184'. Stage up pump and pump ball on seat, 2 bpm @ 270 psi. Increase pressure to 2000 psi to set liner hanger, stack 20k Ibs on liner to verify hanger set. Increase pressure to 4000 psi to set ZXP packer. Bled down pressure and closed annular, tested packer to 1500 psi for 5 minutes. Monitor well - static. POH with 4" DP. Break out and LD liner running tool. Clean and clear rig floor. Service top drive, blocks and iron roughneck. MU whipstock assembly. PU and Orient MWD. PU 12 jts of 4-3/4" DC's and 24 jts of 4" HWDP. RIH wI Whipstock Assembly on 4" DP to 6,399'. MU top drive and orient whipstock. RIH and set whipstock anchor and dummy seal assembly at 6,457'. Whipstock slide oriented 14 deg left of highside. Set down whipstock trip anchor wI 20,000# slackoff, stacked addtionaI10,000# on anchor to ensure set. PU w/1 0,000# overpull to check anchor set. Stacked 40,000# on mill and sheared free from whipstock. PU to neutral weight and rotated drill string to ensure mills sheared free from whipstock slide. Top of whipstock at 6,397'. Held PJSM. Displaced well bore from SFMOBM to MOBM. Pump rate 3 bpm @ 1,200 psi. Total displacement 240 bbls. Took returns of SFMOBM back to pit #3 and hauled to MI plant for reconditioning. Circulated mud system one full surface to surface to condition mud. Mill window from 6397' to 6409'. Continue milling and dressing window to 6423'. WOM = 5 klbs RPM = 100-110 GPM = 285 @ 1910 psi Torque = 5-8k FtLbs P/U 120k S/O 11 Ok ROT 105k 100 Ibs of metal recovered Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12114/2004 15:00 - 16:30 1.50 STWHIP P WEXIT Circulate 35 bbl hi-vis sweep around to clean metal from hole. 16:30 - 18:30 2.00 STWHIP P WEXIT Monitor well - static. Slug DP and POH with milling assembly. 18:30 - 20:30 2.00 STWHIP P WEXIT Stand back HWDP and DC's. LD milling BHA. 20:30 - 22:00 1.50 BOPSUP P WEXIT Flush and drain BOP stack. Pull wear bushing and install test plug 22:00 - 22:30 0.50 BOPSUP P WEXIT RU BOP test equipment fill stack with water. 22:30 - 00:00 1.50 BOPSUP P WEXIT Test BOPE to 3500 psi 1250 psi, test annular to 2500 psi 1250 psi for 5 minutes each. Witness of BOP test waived by John Spaulding with AOGCC. 12/15/2004 00:00 - 04:00 4.00 BOPSUP P WEXIT Continue testing BOPE to 3500 psi I 250 psi, test annular to 3500 psi I 250 psi for 5 minutes each. Witness of BOP test IWEXIT waived by John Spaulding with AOGCC. 04:00 - 04:30 0.50 BOPSUPP RD test equipment, pull test plug. Drain water from stack to cuttings box. Install wear bushing 04:30 - 05:00 0.50 STWHIP P WEXIT PJSM with Anadrill and all rig personnel on Picking up and loading RA sources in BHA. 05:00 - 09:00 4.00 STWHIP P WEXIT 'PU and MU 6-3/4" directional BHA with Hycalog DS146X. Load RA sources and RIH. 09:00 - 13:00 4.00 STWHI P P WEXIT RIH with BHA #16 on DP. MU top drive and shallow test MWD at 1000'. Break circ every 20 stands on trip in. 13:00 - 14:30 1.50 STCTPL P WEXIT Log down across 2 RA markers and confirm depths at 5933' and 6055' MD DP measurement - OK. Obtain benchmark ECD readings with PWD at 10.08 ppg @ 325 gpm and validate ECD model. 14:30 - 15:30 1.00 STWHI P P WEXIT . Cut drilling line. 15:30 - 16:00 0.50 STWHIP P WEXIT MU top drive, orient tool 14 degrees right and RIH passing through window at 6397' without difficulty. Stage up pump and wash down to TD at 6423'. 16:00 - 00:00 8.00 DRILL P PROD2 Directional drill from 6423', to 6906' as per directional plan. WOB = 5-8 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2820 psi on Btm, 2440 psi off Btm Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm PIU 120k S/O 95k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.10 ppg Actual ECD = 10.23 ppg ART last 24 hrs. = 1.48 hrs. AST last 24 hrs. = 1.63 hrs. Total drilling hours = 3.11 hrs 12/16/2004 00:00 - 00:30 0.50 DRILL P PROD2 Directional drill from 6906', to 7003' as per plan. WOB = 5-10 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm P/U 120k S/O 95k ROT 11 Ok Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12116/2004 P Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. I Calculated ECD = 10.13 ppg I Actual ECD = 10.40 ppg 00:30 - 01 :30 1.00 DRILL N RREP PROD2 Repair top drive upper kelly valve actuator. 01 :30 - 07:00 5.50 DRILL P PROD2 Directional drill from 7003', to 7292' as per directional plan. WOB = 4-7 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2550 psi on Btm, 2410 psi off Btm Torque = 5-6k FtLbs on Btm, 5k FtLbs off Btm P/U 120k S/O 95k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Crossed fault at 6895' MD. Calculated ECD = 10.19 ppg Actual ECD = 10.20 ppg 07:00 - 09:00 2.00 DRILL N DPRB PROD2 Saw sudden increase in pump pressure of -700 psi and ECD jump to 10.45 ppg shortly after making a connection. Suspect cuttings avalanching uphole (in casing). Drilling in OBc shale from 7050' MD. Backream out from 7292 - 7090' to clean up hole. Getting back abundant amount of shale cuttings approx 1/8" - 1/4" cubes (angular). Continue slow backreaming until hole cleaned up and pressure & ECD returned to normal. No mud losses noted. 09:00 - 09:30 0.50 DRILL N DPRB PROD2 RIH to bottom - no problems. 09:30 - 13:00 3.50 DRILL P PROD2 Directional drill from 7292', to 7420' as per plan. WOB = 5-10 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 2600 psi on Btm, 2430 psi off Btm Torque = 5-5.5k FtLbs on Btm, 4-5k FtLbs off Btm I P/U 120k S/O 95k ROT 11 Ok Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.13 ppg Actual ECD = 10.40 ppg 13:00 - 15:00 2.00 DRILL N DFAL PROD2 Cuirculate while attempting to reestablish communication with MWD/LWD tools. 15:00 - 16:30 1.50 DRILL N DFAL PROD2 Backream from 7420' to 7100' to clean hole prior to trip for MWD. 16:30 - 18:00 1.50 DRILL P PROD2 Communication with MWD/LWD re-established. Circulate hole clean and RIH to bottom at 7420'. 18:00 - 23:00 5.00 DRILL P PROD2 Directional drill from 7420', to 7920' as per plan. WOB = 5-9 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3010 psi on Btm, 2860 psi off Btm Torque = 6k FtLbs on Btm, 5k FtLbs off Btm Printed: 217/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12116/2004 18:00 - 23:00 5.00 DRILL P PROD2 P/U 120k SIO 93k ROT 1 05k I Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.29 ppg 1.001 DRILL Actual ECD = 10.31 ppg 23:00 - 00:00 P PROD2 Saw pressure and ECD increase with corresponding increase I in 1/8" to 1/4" angular to blocky cutting sized shale pieces I Ip across shaker. Circulated weighted sweep surface to surface. 12/17/2004 00:00 - 00:30 0.50' DRILL PROD2 Continue to circulate weighted sweep out of hole. Sweep brought an increase in cuttings volume across shaker, mostly 11/4" to 118" angular to blocky shale and some fine sands. 00:30 - 02:30 2.00 DRILL P PROD2 I Directional drill from 7920' to 8059' sliding as required to build I into the OBb as per plan. I I ¡WOB = 9-10 klbs i RPM Surf= 80, DH = 260 !GPM = 330 @ 3140 psi on Btm, 3040 psi off Btm I IT orque = 5k FtLbs off Btm PIU 123k SIO 93k ROT 105k Backream each stand at drilling rate, reducing pump rate on I down stroke. Survey every 30'. I Added 1 drum of HRP to mud system to increase VP and gel strength. Calculated ECD = 10.31 ppg Actual ECD = 10.71 ppg 02:30 - 03:30 1.00 DRILL P PROD2 Circulate for ECD management, circulating HPR through system. 03:30 - 07:00 3.501 DRILL P I PROD2 Directional drill from 8059' to 8347' sliding as required to I maintain OBb contact as per plan. WOB = 6-7 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3200 psi on Btm, 2970 psi off Btm Torque = 5.5k FtLbs on Btm, 5k FtLbs off Btm P/U 122k S/O 93k ROT 1 06k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.30 ppg Actual ECD = 10.78 ppg 07:00 - 07:30 0.50 DRILL P PROD2 Circulate for ECD management. 07:30 - 12:00 4.50 DRILL P PROD2 ,Continue drilling ahead to 8636' MD. Switched from #2 to #1 mud pump. MWD quit working shortly after switching pumps. 12:00 - 13:30 1.50 DRILL P PROD2 Circ and pump out of hole 5 stands to try and clear MWD - OK. RIH to bottom. 13:30 - 00:00 10.50 DRILL P PROD2 Directional drill from 8636' to 9400' sliding as required to maintain OBb contact as per plan. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12117/2004 13:30 - 00:00 10.50 DRILL P PROD2 WOB = 6-8 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3400 psi on Btm, 3100 psi off Btm Torque = 8k FtLbs on Btm, 6k FtLbs off Btm P/U 125k S/O 80k ROT 100k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.76 ppg Actual ECD= 11.11 ppg ART last 24 hrs. = 2.88 hrs. , AST last 24 hrs. = 4.19 hrs. Total drilling hours = 7.07 hrs 12/18/2004 00:00 - 08:00 8.00 DRILL P PROD2 Directional drill from 9400' to 10143' sliding as required to maintain OBb contact as per plan. WOB = 3-4 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3750 psi on Btm, 3440 psi off Btm Torque = 6-7k FtLbs on Btm, 6k FtLbs off Btm PIU 135k SIO 80k ROT 115k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Circulate 15bbllo-vis sweep around at 9906'. Slide one full stand to get top drive down to rig floor for troubleshooting. ¡Calculated ECD = 10.76 ppg I PROD2 Actual ECD = 11.18 ppg 08:00 - 11 :00 3.00 DRILL N RREP After making a slide and connection, top drive would not rotate I or back out of connection. Check out top drive - nothing conclusive seen but possibly a bad encoder that controls TD rotation. 11 :00 - 14:30 3.50 DRILL N RREP PROD2 Get TD connection broken and back out with rotary table. POH to window for top drive repairs - also need to replace blower fan for motors in TD that failed previously. , POH to window - no pumping or backreaming possible. Work thru tight spots at 9617',9554-44',9420',9340',9175', 9150-40'. Overpulls to 25 klbs. 14:30 - 21 :30 7.00 DRILL N RREP PROD2 Repair top drive. Replace encoder and purge moisture from upper kelly valve airlines. Blow moter has failed, no spare on Slope but will be able to drill ahead unit! new motor is available. 21 :30 - 22:30 1.00 DRILL N RREP PROD2 RIH to 7956' 22:30 - 23:30 1.00 DRILL N RREP PROD2 MU top drive, stage up pumps and break circulation. TD made up on connection erratically. Top drive saver sub threads have been stripped from pin when making up the stand. Appears to be caused by improper hook-up of new encoder that caused the connection to overtorque. 23:30 - 00:00 0.50 DRILL N RREP PROD2 LD damaged joint of 4" DP. POH to window to change top drive Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12/18/2004 23:30 - 00:00 0.50 DRILL N RREP PROD2 saver sub. 12/19/2004 00:00 - 01 :00 1.00 DRILL N RREP PROD2 Continue POH to change out top drive saver sub. 01 :00 - 02:30 1.50 DRILL N RREP PROD2 Change out top drive saver sub. 02:30 - 04:30 2.00 DRILL N RREP I PROD2 ¡ RIH to 10132', make up top drive and break circulation at 18246'. 04:30 - 05:00 0.50 DRILL N RREP PROD2 I Wash last stand to bottom at 10143' 05:00 - 00:00 19.00 DRILL P PROD2 Directional drill from 10143' to 11656', sliding as required to maintain OBb contact as per plan. WOB = 4-5 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3750 psi on Btm, 3440 psi off Btm Torque = 6-7k FtLbs on Btm, 6k FtLbs off Btm PIU 135k S/O 80k ROT 113k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. Calculated ECD = 10.76 ppg Actual ECD = 11.18 ppg ART last 24 hrs. = 3.25 hrs. I AST last 24 hrs. = 5.26 hrs. ¡Total drilling hours = 8.51 hrs 12/20/2004 00:00 - 05:30 5.50 DRILL P PROD2 I Directional drill from 11656' to 12160', sliding as required to maintain OBb contact as per plan. WOB = 4-5 klbs RPM Surf= 80, DH = 260 GPM = 330 @ 3640 psi on Btm, 3410 psi off Btm Torque = 7-8k FtLbs on Btm, 7k FtLbs off Btm P/U 147k SIO 65k ROT 120k Backream each stand at drilling rate, reducing pump rate on down stroke. Survey every 30'. 1.50 I DRILL Calculated ECD = 10.85 ppg Actual ECD = 11.02 ppg 05:30 - 07:00 P PROD2 Circulate a 20 bbllo-vis sweep followed by a 20 bbl weighted sweep surface to surface. RPM = 80 330 gpm @ 3300 psi. 07:00 - 14:00 I 7.00 DRILL P PROD2 MU top drive and backream from 12160' to 10050'. Stands 2 & 3 took significant amount of backreaming - pressure increases but no real increase in ECD as if reaming undergauge hole rather than moving cuttings beds. Continue backreaming - became much better above 11300'. RPM = 95 GPM = 330 @ 3000 psi Torque = 8-10k FtLbs 14:00 - 15:00 1.001 DRILL P PROD2 CBU at 10050' - 330 gpm & 95 rpm. Circ until shakers cleaned Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12120/2004 14:00 - 15:00 1.00 DRILL P PROD2 up. Pull 3 stds dry - no problems, hole clean. 15:00 - 17:00 2.00 DRILL P PROD2 RIH to bottom. 117:00 - 22:00 5.00 DRILL P PROD2 Circulate BU X 3 to clean and condition hole. ! RPM = 95 330 gpm @ 3350 psi. Intial ECD = 10.50 ppg Final ECD = 10.26 ppg Calculated ECD = 10.86 ppg SymOps: PJSM. Transfer MOBM from pit module to 400 bbl upright tanks. 22:00 - 22:30 0.50 DRILL P . PROD2 PJSM with MI, Veco and all rig personnel on displacing well to I SFMOBM. 22:30 - 00:00 1.50 DRILL P PROD2 I Displace well to Solids Free MOBM. I rate 145 gpm @ 1560 psi 12/21/2004 00:00 - 01 :00 1.00 DRILL P I PROD2 Continue displacing well to Solids Free MOBM. rate 145 gpm @ 1560 psi 01 :00 - 01 :30 0.50 DRILL P PROD2 Monitor well - static. Take slow pump rates. Blow down top drive. 01 :30 - 05:00 3.50 DRILL P PROD2 POH from 12160 to the window at 6397'. No problems or tight spots 05:00 - 06:00 1.00 DRILL P PROD2 Service top drive, blocks, crown and drawworks. Change oil in top drive. 06:00 - 07:00 1.00 DRILL N RREP PROD2 Finish changing oil in top drive. 07:00 - 10:00 3.00 DRILL P PROD2 I POH to BHA 10:00 - 12:30 2.50 DRILL P PROD2 I PJSM. Handle BHA. Remove nuclear source. LD LWD, MWD, motor & bit DSX146H (RR3). 12:30 - 13:00 0.50 DRILL P PROD2 Clear & clean rig floor. 13:00 - 13:45 0.75 CASE P PROD2 RU to run 4.5" slotted liner. 13:45 - 14:00 0.25 CASE P PROD2 PJSM for running liner. 14:00 - 20:00 I 6.00 CASE P PROD2 Run 4.5" IBT-M slotted liner in OBb lateral per running order. MU 4 jts solid liner, swell packer, 5 jts slotted liner and aluminium billet liner top. Depth in P/U wt S/O wt 1040' 49K 50K 2082' 58K 62K 3115' 70K 72K 4155' 81K 79K 4580' 85K 80K 20:00 - 00:00 4.00 CASE P PROD2 Run 4 1/2" slotted liner in OBb lateral on 4" DP. Depth in PIU wt SIO wt 5553' 97K 90K 6510' 109K 94K 7470' 115K 92K 8430' 122K 91K 12/22/2004 00:00 - 02:30 2.50 I CASE P PROD2 - RIH w/4 1/2" slotted liner on 4" DP to TD @ 12160'. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: Spud Date: 12/29/2000 End: 2/3/2005 11/1 9/2004 2/3/2005 9ES Depth in P/U wt S/O wt 9387' 130K 82K 9674' 137K 85K 9950' 140K 87K , 10230' 147K 93K 110415' 154K 92K 10605' 149K 93K 11 080' 160K 87K 11560' 167K 83K 12035' 167K 80K 12160' 172K 81K PROD2 - Tag bottom @ 12160' w/5K. P/U off bottom to break over pt @ 172K & tag bottom w/10K. Establish circulation @ 100 GPM 960 psi & pick up string. Up wt 135K - shut down pump & continue picking up string. , String wt indicates off of liner. - POH wI 4" DP & UD aluminum billet running spear. - Clear & clean rig floor. - PJSM for P/U BHA. - PIU & M/U BHA - 6 3/4" DSX 146 PDC bit, XP motor w/1.5 deg bend, bypass sub, NM stab, NM flex lead collar, MWD, PWD, ADN, 2 NM flex DC's, XO, & jars. - RIH from 209' to 6376' filling every 25 stands. - Shallow test MWD @ 1165' - 330 GPM, 1700 psi. - PJSM - slip & cut drilling line. - PJSM - R/U & transfer MOBM from upright tanks & displace well from solids free MOBM to MOBM. 330 GPM, 2350 psi, 75 RPM & reciprocating. - Establish clean hole ECD's at 6376' as follows: 1'- RIH to 6526' - Wash from 6526' to top of billet@7581'DPM. 70 GPM 300 psi 20 RPM. 1- Trench from 7574' to 7581' @ 330 GPM 2800 psi. 1- Time drill @ 2 FPH for 2' & 4 FPH for 4' to sidetrack off of 'billet @ 330 GPM 2800 psi. - Fine granules of aluminum seen @ shakers on B/U. - Time drill @ 4 FPH for 4' & 12 FPH for 10'. Sidetrack off of aluminum billet successful. PU above billet and make a pass by the billet - pumps on. OK. - 100% slide @ 330 GPM 2820 psi PROD3 - Drill directionally in 6 3/4" hole from 7601' to 8250' backreaming each stand at full drilling rate & reducing pump rate to 75% on downstroke. 02:30 - 03:00 0.50 CASE P 03:00 - 07:00 4.00 CASE P , PROD2 07:00 - 07:30 I 0.50 CASE P i PROD2 07:30 - 08:00 I 0.50 STKOH P ¡WEXIT 08:00 - 10:30 2.50 STKOH P ,WEXIT 10:30 - 14:00 3.50 STKOH P WEXIT 14:00 - 15:00 1.00 STKOH P WEXIT 15:00 - 18:00 3.00 STKOH P WEXIT 18:00 - 20:00 2.00 STKOH P WEXIT 20:00 - 22:00 2.00 STKOH P WEXIT 22:00 - 00:00 2.00 STKOH P WEXIT 12/23/2004 00:00 - 02:00 2.00 DRILL P PROD3 02:00 - 12:00 10.00 DRILL P GPM 280 280 330 330 RPM o 60 o 60 Pump Pressure 1655 1655 2350 2350 ECD 9.84 9.92 10.02 10.05 - WOB 6K, 330 GPM, PP off bottom 2850 psi, on bottom 3150 Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 8-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11 /1 9/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12123/2004 02:00 - 12:00 10.00, DRILL P PROD3 psi, 80 RPM, Tq on bottom 7K, Tq off bottom 6K. - PIU wt 125K, SIO wt 93K, Rot wt 105K. - Calculated ECD 10.36, actual ECD 10.63. AST 2.98 hrs, ART 1.18 hrs, ADT 4.16 hrs. 12:00 - 00:00 12.00 DRILL P PROD3 1- Drill directionally in 6 3/4" hole from 8250' to 9493' I backreaming each stand at full drilling rate & reducing pump I rate to 75% on downstroke. - WOB 5-8K, 330 GPM, PP off bottom 2830 psi, on bottom 3250 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K. - P/U wt 130K, S/O wt 75K, Rot wt 107K. - Calculated ECD 10.65, actual ECD 11.0. - AST 2.43 hrs, ART 2.72 hrs, ADT 5.15 hrs. 12/24/2004 00:00 - 12:00 12.001 DRILL P PROD3 - Drill directionally in 63/4" hole from 9493' to 10526' backreaming each stand at full drilling rate and reducing pump I rate to 75% on downstroke. - WOB 5-8K, 330 GPM, PP off bottom 3200 psi, on bottom 3500 psi, 80 RPM, Tq on bottom 8K, Tq off bottom 7K. - PIU wt 145K, SIO wt 77K, Rot wt 115K. - Calculated ECD 10.79, actual ECD 10.96. - AST 2.69 hrs, ART 2.36 hrs, ADT 5.05 hrs. 12:00 - 00:00 12.00 DRILL P PROD3 - Drill directionally in 6 3/4" hole from 10526' to 11437' backreaming each stand at full drilling rate and reducing pump rate to 75% on downstroke. -WOB 5-8K, 330 GPM, PP off bottom 3250 psi, on bottom 3600 psi, 80 RPM, Tq on bottom 9K, Tq off bottom 8K. - PIU wt 154K, SIO wt 65K, Rot wt 115K. - Calculated ECD 10.49, actual ECD 10.76. - AST 2.43 hrs, ART 2.85 hrs, ADT 5.28 hrs. 12/25/2004 00:00 - 06:30 6.50 DRILL P PROD3 - Drill directional in 63/4" hole from 11437' to TD @ 12043' MD. Backream each stand at full drilling rate & reduce pump rate to 75% on downstroke. - WOB 5-8K, PP off bottom 3260 psi, on bottom 3700 psi, 80 RPM, Tq on bottom 10K, off bottom 9K. - PIU wt 165K, SIO wt 60K, Rot wt 115K. - Calculated ECD 10.71, actual ECD 10.89 - AST 1.12 hrs, ART 2.07 hrs, ADT 3.19 hrs. 06:30 - 10:00 3.50 DRILL P PROD3 - Circ lo-vis sweep surface to surface. Circ until actual ECD was 10.78 vs 10.74 calculated. 10:00 - 10:30 0.50 DRILL P PROD3 - Monitor well while blowing down TD. 10:30 - 17:30 7.00 DRILL P PROD3 - POH for check trip to window. Hole condition v. good - no pump or backreaming required. - Pump out past billet and saw 10k overpulls - stabilizer on ADN. Nothing when bit went across billet. Orient 120L and stop Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 12125/2004 10:30 - 17:30 7.00 DRILL P PROD3 pump. Run in below billet and back up above - no obstructions, no overpulls. - Continue POH to window. 17:30 - 19:00 1.50 DRILL P PROD3 - RIH to 50' above billet - MIU TD & orient 90L. RIH wlo pump & tag billet @ 7581' w/5K. P/U above billet, turn on pump, & in , 30L setting. Orient 120L & RI H past billet wI no problem. 19:00 - 21 :30 2.50 DRILL P PROD3 - RIH to TD @ 12043' - hole slick. 21 :30 - 23:00 1.50 DRILL P PROD3 - Pump lo-vis weighted sweep & circ surface to surface @ 330 GPM 3700 psi, 90 RPM & reciprocating. - Calculated ECD 10.76, actual ECD 10.8 to 10.85. 1- Prepare for displacement by reducing surface volume. Pump '100 bbls MOBM into tank farm. Take on SFMOBM into pit 3. 23:00 - 00:00 1.00 DRILL P PROD3 - Displace MOBM wI SFMOBM @ 285 GPM 2650 psi, 90 RPM & reciprocating. 12/26/2004 00:00 - 01:15 1.25 DRILL P PROD3 - Displace MOBM wI SFMOBM @ 285 GPM 2650 psi, 90 RPM, , & reciprocating. 01:15 - 01:30 0.25 DRILL P PROD3 1- BID TD - monitor well - static. 01 :30 - 05:30 4.00 DRILL P PROD3 ,- POH to 6000' - hole in excellent shape wI maximum 5K drag. No sign of billet while pulling by wI ADN stab or bit. 05:30 - 06:30 1.00 DRILL P PROD3 - Service TD. I - Monitor well. 06:30 - 11 :30 5.00 DRILL P PROD3 - POH to 684'. , 11 :30 - 19:00 7.50 DRILL N WAIT PROD3 ,- Stab TIW valve in string - monitor well wI hole fill pump on while waiting for weather to improve. Phase 3 conditions. i - 6.5 bblloss for 7.5 hrs. 19:00 - 19:30 0.50 DRILL P 1 PROD3 - PJSM for handling BHA & source - POH to BHA. 19:30 - 21 :30 2.00 DRILL P PROD3 - UD BHA. 21 :30 - 22:00 0.50 CASE P PROD3 - Clear & clean floor. 22:00 - 22:30 0.50 CASE P PROD3 - Service TD & drawworks. 22:30 - 00:00 1.50 FISH P PROD3 - MIU Whipstock retrieving BHA as follows: Fixed lug retrieval hook, 1 jt 3 1/2" HWDP, bumper sub, oil jars, float sub, MWD, &XO. 12/27/2004 00:00 - 00:30 0.50 STWHIPI P PROD3 - Continue MIU whipstock retrieving BHA. 00:30 - 02:00 1.50 STWHIP P PROD3 ,- RIH w/8 stands HWDP. 1- Shallow test MWD & BID TD. 02:00 - 03:30 1.50 STWHIP P PROD3 - RIH wI whipstock retrieval ass'y on 4" DP to 4178'. 03:30 - 04:00 0.50, STWHIP P PROD3 - CBU to condition mud @ 285 GPM 1180 psi. - BID TO. 04:00 - 06:00 2.00 STWHIP P PROD3 - RIH wI 4" DP to -30' above whipstock. Fill pipe & orient hook wI MWD. - P/U wt 130K, SIO wt 105K. - RIH to 5' below top of whipstock @ 6402'. Engage slot in whipstock face - OK. PIU & release whipstock wI 65K over. - Monitor well. 06:00 - 07:00 1.00 STWHIP P PROD3 - CBU @ 250 GPM 1100 psi. 07:00 - 12:00 5.00 STWHIP P PROD3 - POH wI 4" DP to BHA. 12:00 - 14:00 2.00 STWHIP P PROD3 - UD BHA. - Clear floor of tools & clean floor. 14:00 - 15:00 1.00 CASE P PROD3 - PJSM - RIU 4 1/2" liner running equip't. 15:00 - 19:00 4.00 CASE P PROD3 Run 4.5" slotted liner to 2484'. 19:00 - 20:00 1.00 CASE N RREP PROD3 Replace casing tongs. 20:00 - 22:30 2.50 CASE P PROD3 Continue running 4.5" slotted liner. 22:30 - 23:30 1.00 CASE N RREP PROD3 Replace cable on laydown machine. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/1 9/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12127/2004 23:30 . 00:00 0.50 CASE P PROD3 Continue running 4.5" slotted liner to 4000'. 12/28/2004 100:00 - 03:30 3.50 CASE P PROD3 - RI H wI 4 1/2" guide shoe jt, 116 jts 4 1/2" slotted liner & 16 jts 4 1/2" solid liner. - Avg M/U tq 3500 ftllbs. 03:30 - 04:00 0.50 CASE P PROD3 - CIO to 3 1/2" elevators. - PIU & MIU hook hanger. Total length of liner, hook hanger, & associated pup jts 5627.99'. · UD tubing tongs. 04:00 - 11 :30 7.50 CASE P PROD3 - RIH w/4 1/2" liner on 4" DP to 11921'. - Worked through window on 2nd attempt after picking up Ip above it & rotating string 1/2 turn. - Did not see aluminum billet @ 7581'. , 11 :30 - 18:30 7.00 CASE PROD3 - Attempt to hook hanger on window wlo success. Able to run hook 10' below window, but unable to get beyond 12017'. (TD @ 12043') 18:30 - 00:00 5.50 CASE N DFAL PROD3 - Monitor well. - POH to 7255' wI 4" DP slowly (3-4 min per stand) to prevent swabbing due to swell packers. 00:00 - 01 :00 I - Strapping DP while POH. 12/29/2004 1.00 CASE N DFAL PROD3 - POH wI 4" DP to hook hanger. - 1.84' difference in tally & SLM. 01 :00 - 03:30 2.50 CASE N DFAL PROD3 - CIO elevators & P/U hook hanger & inspect. No damage to hook or hanger. · R/U casing tongs & UD hook hanger & ball catcher assy. - UD 1 jt 4 1/2" slotted liner. - M/U hook hanger & ball catcher assy. - UD casing tongs. 03:30 - 11 :00 7.50 CASE N DFAL PROD3 · RIH wI hook hanger on 4" DP to 7013' - Tag up on liner tie back @ 6465" - PIU above TOW & rotate string 1/2 turn. Made it through window on 2nd attempt. ! - RIH to 11,900' 111 :00 - 14:00 I N DFAL PROD3 - String Wt. down 75-50k, up 170k 3.00 I CASE - Attempted to set hook wlo success. Able to work hook 10' outside window, could not get below 11,976'. Decided to POOH and dress window. 14:00 - 20:30 6.50 CASE N DFAL PROD3 - POH with 4" DP to hanger. 20:30 - 21 :30 1.00 CASE N DFAL PROD3 - Change elevators 3 1/2" - UD hanger - Change elevators to 4 1/2" 121 :30 - 00:00 2.50 CASE N DFAL PROD3 - PJSM - discussed risks associated with laying down liner · POH UD 16 jts 41/2" solid liner, 8 jts 41/2" slotted liner 1 x 1. I - UD 2 swell packers. Original OD 6.4" - currently 6.53" 12/30/2004 00:00 - 07:30 7.50 CASE N DFAL PROD3 - POOH w/4 1/2" slotted liner. - Total jts. UD, 115 slotted,16 solid, 1 shoe jt, 2 swell packers and 1 hook hanger. 07:30 - 08:30 1.00 CASE N DFAL PROD3 - Monitor well - RID TBG equipment - Clearlclean rig floor 08:30 - 09:00 0.50 BOPSUF P PROD3 - PJSM - Pulled wear bushing - Set test plug Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12130/2004 08:30 - 09:00 0.50 BOPSUF P PROD3 09:00 - 13:30 4.50 BOPSUF P PROD3 I 13:30 - 14:30 1.00 BOPSUP P PROD3 14:30 - 15:00 0.50 CASE N DFAL PROD3 15:00 - 17:30 2.50 CASE N DFAL PROD3 17:30 - 20:00 2.50 CASE N DFAL PROD3 20:00 - 23:00 3.00 CASE N DFAL PROD3 23:00 - 00:00 1.00· CASE N DFAL PROD3 12/31/2004 00:00 - 05:00 05:00 - 07:00 07:00 - 11 :00 11 :00 - 12:00 12:00 - 12:30 12:30 - 13:30 13:30 - 17:00 17:00 - 21 :00 5.00 CASE N - R/U test equipment - Test BOPE's - 3,500 psi. highl 250 psi. lowl 5 min. - Witness of test wavied by John Chrisp (AOGCC) - Pull test pi ug - Install wear bushing - Blow dn. test lines - RID test equipment - Cut apart bent shoe jt. & slotted jt. wI Wachs cutter - Clean out under rotary table (dried excess drilling fluid) - CIO air boot ! - PJSM - Build window polish mill assy. (2 ea. string mills @ 63/4" OD) - Test MWD before proceeding in hole - RIH wI 4" DP to 6300' (63 stds DP) - Fill DP every 2000' - Orient bent jt. I MWD to 15 deg. left of HS and RIH to 6388' - P/U std # 64 & reorient and attempt to slide out window (TOW @ 6397' & BOW @ 6409'). Bottomed out in tie back sleeve @ 6461 '. No success after repeated attempts. DFAL PROD3 - Attempt to exit window wI polish mill assy. (circ. & non-circ.) - Position/orient string @ 90 deg. increments & attempt exit - Rotate @ 6393' @ 10 rpm w/steady 3500 ftllbs torque. Repeat @ 6405' (middle of window) with same results. - Rotate fl 6390' to 6420' @ 5 rpm wI 3000 ftllbs steady torque, (rotary limit set @ 3500 ftllbs.). Attempting to stall drill string @ window. No success - Positionlorient string @ 45 deg. increments & attempt exit - POH to 6358' (UD 1 jt.), orient to 9 deg. left of HS. RIH & P/U 1 jt. and bottom out in tie-back sleeve @ 6461 '. - Same as above but @ 14 deg. left of HS, no success. I 2.00 CASE N 4.00 CASE N 1.00 CASE N 0.50 I CASE N 1.00 CASE N 3.50 CASE N 4.00 CASE N DFAL PROD3 DFAL PROD3 DFAL PROD3 DFAL PROD3 DFAL PROD3 DFAL PROD3 DFAL PROD3 - PJSM . - Slip & cut drilling line. - POH w/4" DP - Pooh w/BHA, B/O & UD same - Clear & clean rig floor - PJSM - Strap and MIU BHA - RIH wI polish mill assy. #2 on 4" Dp to 6310' - String Wt. Up 130K, Dn 100K - Orient bent jt. wI MWD - Pump Rate 80 spm @ 1340 psi. - During orienting process tagged btm of window @ 6409'. Unable to exit window after final orientation of bent jt.! MWD - Repeated attempts made wI different tool orientations W 10 success - While roating Dn @ 5 rpm, wI 5,000 ft.llbs torque and running speed of 30 fpm tagged Btm of window @ 6409', string torqued up and stalled. Unable to pull free with up wt. of 130K. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 12131/2004 17:00 - 21 :00 4.00 CASE N DFAL PROD3 Released torque and applied 2 rds. to the left in 1/2 turn , increments and worked torque Dn. Gradually increasing pick up wt. by 5,000 lb. increments. String pulled free @ 160K, proceeded to RIH and tag tie-back. - Repeated rotating Dn process same as before and tagged again. Continued to apply Rt. hand torque to 7,000 ft.llbs and increase bit wt. to 35K. String broke free and proceeded to RIH í to 6465' to confirm string outside window. 21 :00 - 22:00 1.001 CASE N DFAL PROD3 - RIH to 6740' (bull nose depth), confirmed mills pass through window before prior start of dressing process. - Dress window w/20,25 & 30 rpm, 350 gpm pump w/1600 psi. - Work mills f/6390' t/6415' to dress window. - Work mills fl 6415 t/ 6455' to dress open hole. - After dressing Up Wt. 125K, Dn Wt. 100K W/O rotating or circulating. 22:00 - 22:30 CASE DFAL PROD3 1- No abnormal Up Wt. or Dn. Wt. after dressing 0.50 N 1- POH t/6350' 22:30 - 23:30 1.00 CASE N DFAL PROD3 - Circ B/U @ 300 GPM 1350 psi. - Monitor well 23:30 - 00:00 0.50 CASE N DFAL PROD3 - POH wI mills 1/1/2005 00:00 - 03:30 3.50 CASE N DFAL PROD3 - POH wlpolish mill assy. to BHA 03:30 - 05:30 2.00 CASE N DFAL PROD3 -UD BHA 05:30 - 06:00 0.50 CASE N DFAL PROD3 - Clear floor of excess BHA tools - Clean floor 06:00 - 07:30 1.50 CASE N DFAL PROD3 - PJSM - R/U Tbg. handling equip. to RIH w/4 1/2" slotted liner 07:30 - 16:00 8.50 CASE N DFAL PROD3 - MIU & RIH with 4 1/2" liner. - Avg. make up torque 3600 ft.llbs. - 1 solid shoe it., 116 its. 4 1/2" slotted liner, 16 jts. 4 1/2" solid liner, 2 swell pkr. assy. 16:00 - 16:30 0.50 CASE N DFAL PROD3 - CIO elevators - M/U 75/8" x 41/2" Hook hgr. - String wt. Up 97K - String wt. Dn 87K 16:30 - 17:00 0.50 CASE N DFAL PROD3 - RID Tbg. handling equip. - R/U to RIH wI 4" DP 17:00 - 17:30 ' 0.50 CASE N DFAL PROD3 - RIH wI slotted liner on 4" DP to 6461' (Tagged up on tie-back) 17:30 - 19:00 1.50 CASE IN DFAL PROD3 - UD 2 its. DP and PIU Std. # 10 of 4" DP (needed full std. to ; orient and exit window, allowing tag up on tie-back if needed) - Orient 1/4 turn to right and attempt exit window (no success) - Add another 3/4 turn (1 turn total) and exit window - P/U 2 jts. DP (same ones that were UD) and continue to RIH 19:00 - 23:30 4.50 CASE N DFAL PROD3 - RIH wI slotted liner on 4" DP - Tagged Billet in OBd lateral @ 7581' (rotate 1/2 turn to right and work by same, no problem) 23:30 - 00:00 0.50 CASE N DFAL PROD3 - Liner stopped @ 11215', Up Wt. 175K, Dn Wt. 75K - Reciprocate f/11,180' t/ 11215' - Rotate 1 turn rt. & work torque dn. - Add 1 more turn rt. & work pipe - Add 3 more turns & work pipe until all torque gone. No success Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/1/2005 23:30 - 00:00 0.50 CASE N DFAL PROD3 1/2/2005 00:00 - 00:30 0.50 CASE N DFAL PROD3 - LID 1 jt. (for longer stroke when reciprocating) - Rotate 1 turn rt. and reciprocate pipe and using drawworks braking action to work through tight spot @ 11215' 00:30 - 01 :30 1.00 I CASE N DFAL PROD3 - RIH wI liner on 4" DP t/11 ,971 '. - Up Wt. 167K - Dn Wt. 60K 01 :30 - 03:00 1.50 CASE N DFAL PROD3 - POH t/11 ,965' (hook hgr. @ 6392') - Apply 1 1/2 turns rt, unhook hanger and work pipe dn. to 11,980' - POH t/11 ,955' - Apply 3/4 turn rt. and work torque dn & attempt to hang hook hanger wlo success.. - Apply 1/2 turn and work torque dn. and hang off hgr. - P/U 10' and unseat hgr. and rehang same. (0215 hrs) - Drop 1 3/4" ball and chase w/30 spm @ 300 psi to seat same - Pressure up to 3,000 psi and release from liner - P/U and verify running tool released from liner - P/U Wt. 138K - S/O Wt. 112K - POH t/ 6360' 03:00 - 03:30 0.50 CASE P PROD3 - CBU @ 66 spm @ 1750 psi (2300 calc. stks) 03:30 - 04:30 1.00 CASE P PROD3 - RIH and tag top of Hook Hgr. @ 6392' - Blow Dn Top Drive - Monitor well 04:30 - 07:30 3.00 CASE P PROD3 - POH wI 4" DP 07:30 - 08:00 0.50' CASE P PROD3 · B/O & UD liner running tool 08:00 - 09:00 1.00 CASE P PROD3 - Clean & clear rig floor 09:00 - 09:30 0.50 CASE P PROD3 - PJSM 109:30 - 12:30 · RIU to RIH wI LEM #1 & inner string 3.00 CASE P PROD3 - MIU LEM #1 Assy.; Seal Assy.-3 x 4 1/2" pup jts.; Window Assy.- 4 1/2" pup jt., Casing Swivel, Seal Bore Ext. (inner string- 2 x 2 7/8" tbg. jts., 2 x 27/8" pup jts., Seals & Nozzle Assy.), ZXP Pkr. wI Tie-Back Assy. 12:30 - 19:00 6.50 CASE P PROD3 · RIH wI LEM #1 on 4" DP to 6390' (top of hook hgr. @ 6392'). - Running speed as per Baker Rep. was 30' prl min. · Up WI. 135K - Dn Wt. 112K 19:00 - 20:00 1.00 CASE P PROD3 -Tagged Hook Hgr. top @ 6392' - Apply 1 1/2 turns to right & RIH t/6462' - Up Wt. 137K - Dn Wt. 110K - Continue t/ RIH & tag @ 6481' - Apply 1 1/2 turns & RIH, wlo success - Brk circ. @ 3 bpm @ 490 psi & circ. dn t/ 6490' (mule shoe depth). - LEM locator tagged up in Hook Hgr. Collet Profile @ 6392' - P/U 10' & S/O to verify LEM engaged wI 20,000# on Pkr. 20:00 - 22:00 2.00 CASE P PROD3 - Brk. TD connection & drop 1 3/4" pkr. setting ball - Circ. Ball Dn. @ 2 bpm @ 430psi. (bumped ball with 537 stks) Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/2/2005 20:00 - 22:00 2.00 CASE P PROD3 - PIU tJ 2800 psi. to set ZXP Pkr. (hold 5 min), bleed off pressure - Close upper pipe rams to test ZXP Pkr. x 7 5/8" csg. tJ 1500 psi., Unable to pressure up (pumped 9 bbls 1104 stks. to 700 psi.), bleed off excess pressure. Suspect Pkr. not fully set. - Open Rams . - Pressure up DPI Pkr. tJ 4000 psi. to reset Pkr. (observed I string wt. fluctuation of app. 10/15000 Ibs), hold 5 min. & bleed off pressure. Also released running tool during this process. - Close top rams & retest Pkr x 7 5/8" csg. wI 1500 psi., successful - Pick up 20' (out of pkr.) & rotate dn @ 25 rpm to verify Pkr. set. Tag LEM tie-back @ 6335', Pkr set @ 6346' - POH wI circ. sub tJ 6332' 22:00 - 23:00 1.00 CASE P PROD3 - Circ. B/U 6332' (reciprocating Dp) @ 6 bpm @ 1100 psi. (calc. stks 2400) - Blow Dn. TD 23:00 - 00:00 1.00 CASE P PROD3 - POH wI LEM running tool on 4" DP 1/3/2005 00:00 - 02:30 2.50 CASE P PROD3 - POH wI LEM running tool on 4" Dp 02:30 - 03:00 0.50 CASE P PROD3 - R/U 2 7/8" handling tools & equip. to UD inner string 03:00 - 03:30 0.50 CASE P PROD3 - B/O & UD LEM Running Tool 03:30 - 04:30 1.00 CASE P PROD3 - UD 2 7/8" Inner string 04:30 - 05:00 0.50 CASE P PROD3 - RID 2 7/8" handling tools & equip. 05:00 - 06:00 1.00 CASE P PROD3 - Clear & Clean rig floor 106:00 - 09:30 3.50 P WEXIT - PJSM - MIU Whipstock BHA fl OBa lateral (BHA length=1437.90') I - Orient MWD tJ Whipstock - Shallow test MWD wI 200 gpm, Tool Pulse 3601 460 psi. - BHA to Top of Slide------1196.74' 51 stds 4" Dp + 25.47'---4908.10' Depth to Top of Slide-----61 07.87' 09:30 - 14:00 4.50 STWHIP P WEXIT - RIH wI Whipstock BHA on 4" Dp tJ 6323' - Run speed 90'1 min. - String Wt. Up 145K, Dn 110K 14:00 - 14:30 0.50 STWHIP P WEXIT . - Engaged Pump, 300 gpm @ 1980 psi. 1- Reciprocate Dp & Orient Whipstock to 14 deg. Left (obtained 14 good tool faces) ! - RIH & set Whipstock Anchor, Top of Whipstock Slide @ 6108' - PIU to 15K overpull to verify Whipstock set - S/O and stacked 42K & Sheared Mills free 14:30 - 16:30 2.00 STWHIP P WEXIT - PJSM - Displace Wellbore fluid tJ MOBM - 260 bbls @ 300 gpm @ 1980 psi - Circulated 2 X B/U to condition mud 16:30 - 21 :30 5.001 STWHIP P WEXIT - Mill Window f/6108' tJ 6120' (TD @ 6138') - WOM 2-3K, RPM 75-100 - Torque 8,000-9,000 ftIlbs - Pump 320 gpm @ 1800 psi - String Wt. Up 145K, Dn 107K Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 5-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/3/2005 16:30 - 21 :30 5.00 STWHIP P WEXIT - Retrieving Slot @ 6113' @ 14 deg. Left 21 :30 - 22:30 1.00 STWHIP¡ P WEXIT - Circ. Sweep S/S (Sweep = 40 bbl MOBM + 55 gal. dm HRP) - Pump 320 gpm @ 1800 psi. - Ream & back ream window while sweep going around BHA - RIH through window dry before POH-no problem - Monitor Well -Static 22:30 - 23:00 0.50 STWHIP¡P WEXIT 1- POH V 5600' 23:00 - 00:00 1.00 STWHIPI P WEXIT 1- PJSM - Slip and Cut Drlg Line 1/4/2005 00:00 - 02:00 2.00 STWHIP P WEXIT - PJSM - Slip & Cut 473' bad Drlg Line 02:00 - 04:00 2.00 STWHIPP WEXIT - POH wI Whipstock Mill Assy. 04:00 - 06:30 2.50 STWHIP! P WEXIT - B/O & UD Baker Milling Tools - Stand back collars and HWDP 06:30 - 08:00 1.50 STWHIP P WEXIT - Clear rig floor of BHA components i-Clear rig floor & under rotary table 08:00 - 08:30 0.50 STWHIP P WEXIT 1- Rig Service 08:30 - 12:30 4.00 STWHIP N RREP WEXIT i-Repair Top Drive 12:30 - 13:30 1.00 STWHIP P 'WEXIT - MIU Stack Washer - Functioned BOPE stack & washed to remove metal cuttings - Flushed Choke, Kill & Flow lines - Blow Dn. TD, Kill & Choke lines 13:30 - 16:00 2.50 STWHIP P WEXIT - PJSM - P/U & MIU 63/4" Driectional Drlg. Assy. - Cleared rig floor, installed Radioactive sources i - Continue to build BHA 16:00 - 19:30 3.50 STWHIP P WEXIT - RIH wI BHA on 4" Dp - Shallow pulse test MWD - Continue RIH V 6050' 19:30 - 20:30 1.00 STWHIP P WEXIT - Establish circulation & Drilg. parameters - String Wt. Rot. 11 OK - Up Wt. 120K, Dn Wt. 105K - ECD 10.0 ppg (calculated) - Pump 330 gpm @ 2300 psi - Set Tool Face 14 deg. left 1- Slide through window (6108'-6120') wlo pump tI 6130' . - Circ Dn. f/6130' V 6138' 20:30 - 00:00 3.50 DRILL P PROD4 - Drlg. f/6138' V 6340' (rotating & sliding) . WOB Sliding 3/4K - Wob Rot. 5K - Rpm 60 - Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftIIbs - Pump Rate 330 gpm - Pressure-Off Btm 2300 psi, On Btm 2400 psi - Calc. ECD 10.0, Act ECD. 10.2 1/5/2005 00:00 - 02:30 2.50 DRILL P PROD4 - Drlg. fl 6340' V 6528' (rotating & sliding) I - WOB Sliding 3/4K - WOB Rot. 5K ,- Rpm 60 '- Torque- Off btm 7,000 ftllbs, On Btm 8,000 ftllbs - Pump Rate 330 gpm - Pressure-Off Btm 2300 psi, On Btm 2400 psi - Calc. ECD 10.0, Act ECD. 10.2 Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/5/2005 02:30 - 03:00 0.50 DRILL P PROD4 - Circulate, as per Geolgist (waiting on MWD logs) - Pump Hi-Vis Sweep (40 bbl MOGM + 55 gal HRP) - Pump Rate 330 gpm @ 2250 psi. - Reciprocating, oriented high-side PROD4 - Drlg. fl 6528' t/7292' (rotating & sliding) - WOB Sliding 3/4K - WOB Rot. 7/8K - Rpm 80 - Torque- Off btm 5,000 ftllbs, On Btm 6,000 ftllbs - Pump Rate 330 gpm - Pressure-Off Btm 2400 psi, On Btm 2600 psi - Calc. ECD 10.18, Act ECD. 10.4 - Strg. Wt. Up 122K, DN 93K, Rot. Wt 108K 03:00 - 12:00 9.00. DRILL . p I 12:00 - 00:00 12.00 DRILL P PROD4 - Drlg. fl 7292' t/ 8444' (rotating & sliding) - WOB Sliding 2K - WOB Rot. 3/4K - Rpm 80 - Torque- Off btm 7,000 ftllbs, On Btm 9,000 ftllbs - Pump Rate 330 gpm - Pressure-Off Btm 2610 psi, On Btm 2760 psi - Calc. ECD 10.4, Act ECD. 10.5 - Strg. Wt. Up 125K, DN 88K, Rot. Wt 109K PROD4 - Drlg. fl 8444' t/ 9310' (rotating & sliding) - WOB Sliding 4K - WOB Rot. 5K - RPM 80 - Torq. On Btm. 7K, Off Btm. 6K - Pump Rate 330 gpml 92 spm - Pump Press. Off Btm. 3100 psi, On Btm 3300psi - Strg. Wt. Up 127K, Dn 98K, Rot. 105K - Calc. ECD. 10.47, Act ECD. 10.39 - SPR #1 30 spm=590 psi 40 spm= 780 psi - SPR #2 30 spm=700 psi 40 spm=880 psi - ART =6.71 hrs. AST =1.29 hrs. 1/6/2005 00:00 - 12:00 12.00 DRILL P I 12:00 - 00:00 12.00 DRILL P PROD4 - Drlg. fl 9310' t/10,433' (rotating & sliding) - WOB Sliding 5/22K - WOB Rot. 4K - RPM 80 - Torq. On Btm. 8K, Off Btm. 6K - Pump Rate 330 gpml 92 spm - Pump Press. Off Btm. 3,000 psi., On Btm. 3100 psi. - Strg. Wt. Up 139K, Dn.94K, Rot. 113K Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/6/2005 12:00 - 00:00 12.00 DRILL P PROD4 - Calc. ECD 10.25, Act ECD 10.27 - ART =3.51 hrs., AST =2.82 hrs. 1/7/2005 00:00 - 10:30 10.50 DRILL P PROD4 -Drlg. f/1 0,433' t/11 ,006' (rotating & sliding) - WOB; Sliding 22/25K, Rot 5K - RPM 80 - Torq. Off Btm. 6K, On Btm 8K - Pump Rate 330 gpml 92 stks - SSP; On Btm 3150 psi., Off Btm 3000 psi - Strg. Wt., Up 139K, Dn. 94K, Rot 113K - ECD; Calc. 10.39, Act 10.43 - SPR #1 30 spm=680 psi. 40 spm=850 psi. - SPR #2 30 spm=680 psi. 40 spm=880 psi. - Observed intermittent high torque causing rotary to stall ( 'torque limiter set at 12,000 ftIlbs). Decision was made to back ream through inverted section of low permeability zone fl 10,150' t/10,900' 10:30 - 14:30 4.00 DRILL P PROD4 - Backream II 11,006' t/ 9,950' Through inverted low permeability section. - RPM 80, Torque 7-9K - Pump rate; 330 gpm @ 2950 psi. - String stalled out @ 15,000 ftIlbs torque @ following depths; '-10,900'-10850',10,725'-10,700',10,600'-10,575', 10,488'-10,450' 10,358'-10,298', 10,164'-10,138', 10.094'-10,044' - RIH t/11,006' 14:30 - 16:00 1.50 DRILL P PROD4 - Reciprocate & rotate @ 11,006' while circulating - Pump & circ. 40 bbl. weighted sweep SIS 1- Pump rate 330 gpm @ 2850 psi. - RPM 80 16:00 - 18:30 2.50 DRILL P PROD4 - Drlg f/11 ,006' t/11, 197' (rotating & sliding) - WOB; Sliding 25K, Rot. 4K - RPM 80 - Torque; On Btm. 8/10K, Off Btm. 7K - Pump; 330 gpml 92 stks. - SSP; On Btm 3130 psi., Off Btm 2980 psi. - Strg Wt.; Up 140K, Dn. 87K, Rot. 115K - ECD; Calc. 10.53, Act. 10.54 - Rotary on TD failed (unable to rotate at all). Continue to circ. and reciprocate pipe while preparing to trouble shoot rotary failure 18:30 - 21 :00 2.50 DRILL N RREP PROD4 - Trouble shoot TD rotary failure (reciprocating and circulating during this process). - Pump; 330 gpm @ 2960 psi. - Strg Wt.; Up 143K, Dn.90K - Suspect rotary rheostat-replace same 21 :00 - 00:00 3.00 DRILL P PROD4 - Drlg f/11 ,006' t/11 ,390' (rotating & sliding) Printed: 217/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 21 :00 - 00:00 - WOB; Sliding 25K, Rot. 3K - RPM 80 - Torque; On Btm. 7K, Off Btm. 6K - Pump; 330 gpml 92 stks. - SSP; On Btm 3200 psi., Off Btm. 3000psi. - Strg Wt.; Up 142K, Dn. 80K, Rot. 115K - ECD; Calc. 10.76 Act. 10.79 1/8/2005 00:00 - 07:00 7.00 DRILL P PROD4 - Drlg. f/11 ,390' t/12, 1 00' (rotating & sliding) - WOB; Sliding 4K Rot. 5K - RPM 80 - Torque; On Btm. 7,500 ftllbs, Off Btm. 7,000 ftllbs. - Pump Rate 330 gpml 92 spm - SSP; On Btm. 3,280 psi. Off Btm. 3,150 psi. - Strg. Wt.; Up 150K, Dn.75K, Rot. 114K - ECD; Calc. 10.68 Act. 10.85 - SPR #1 30 spm=720 psi. 40 spm=900 psi. SPR #2 30 spm=800 psi. 40 spm=900 psi. 07:00 - 09:00 2.00 DRILL P PROD4 - Circ. Btms. Up x 2, until shaker returns were clean. - Pump Rate; 330 gpm @ 3,200 psi. 09:00 - 14:00 5.00 DRILL P PROD4 - Wiper Trip f/12, 100' t/6,040' - Tight Spot @ 10,596', 20K overpull, wrk'd BHA through area, no overpull after working area. 14:00 - 16:30 2.50 DRILL P PROD4 - Circ. Btms. Up x 2 @ 6,040' - Pump Rate 330 gpm @ 2,250 psi. 16:30 - 00:00 7.50 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather - Pump Rate 90 gpm @ 340 psi. - Strg. Wt.; Up 115K, Dn. 105K, Rot. 111 K - Reciprocating & Rotating Drill string periodically 1/9/2005 00:00 - 00:00 24.00 DRILL N WAIT PROD4 - Circulate @ 6,040', Phase 3, Wait On Weather - Pump Rate; 90 gpm @ 340 psi. I - Strg. Wt.; Up 115K, Dn. 105K, Rot. 111 K ¡WAIT I PROD4 - Reciprocating & Rotating periodically 1/1 0/2005 00:00 - 00:00 24.00 DRILL N - Circ. @ 6,040', Phase 3, Wait On Weather I - Pump Rate; 90 pgm @ 340 psi. I - Strg. Wt.; Up 115K, Dn. 105, Rot. 11 K - Reciprocating & Rotating Dp periodically 1/11/2005 00:00 - 06:00 6.00 DRILL N WAIT PROD4 - Circ @ 6,040', Phase 3, Wait On Weather - Pump Rate; 90 gpm @ 340 psi - Strg. Wt.; Up 115K, Dn. 105K, Rot. 11 K - Reciprocate & Rotate periodically 06:00 - 18:00 12.00 DRILL N WAIT PROD4 - Phase 3 lifted to Phase 2 - Continue to Circ. @ 6,040' - Mobilize equipment to clean pad & dig out all vac. trucks. 2 forklifts, 1 cat & service vehicles to start dead trucks - Send Vac. trucks wI SFMOBM back to M-I plant for reheating wI additions of new mud. 18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Circ. @ 6,040', 90 gpm 1340 psi. - Clear and clean around rig & pad wI heavy equipment Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/1 9/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/11/2005 18:00 - 00:00 6.00 DRILL N WAIT PROD4 - Clear all exits, walkways, stairs & steps of excess snow & ice 1/12/2005 00:00 - 00:30 0.50 DRILL P PROD4 - B/O TD & Blow Dn same. Change out first jt. (galled face on tool jt) 00:30 - 02:30 2.00 DRILL P PROD4 - RIH wI 4" Dp & 6 3/4" Directional BHA t/ 9,293' - Dn. Wt. 75K 02:30 - 03:30 1.00 DRILL P PROD4 - M/U TD, Fill Dp & Brk. Circ. (stage up pumps in 30 stk. increments) - Final Pump Rate; 325 gpm @ 2,760 psi. 1- ECD Calc. 10.35, Act. 10.56 - B/O TD & Blow Dn. same 03:30 - 04:30 1.00 DRILL P PROD4 - RIH wI 4" Dp & 63/4" BHA t/12,100' 04:30 - 08:00 . 3.50 DRILL P PROD4 - M/U TD & Brk Circ. - Pump Rate; ICP 330 gpm I 3,550 psi., FCP 330 gpm I 3,400 psi -RPM100 - Torque 8,000 ftIlbs - Strg. WI. Up 112K, Dn. 102K, Rot 108K - ECD Calc. 10.80, Final Act. 10.89 - Pump 20 bbl. Low-Vis sweep followed by 20 bbl. Weighted sweep 08:00 - 10:30 2.50 DRILL P I PROD4 - PJSM - Disp. Well bore to SFMOBM @ 6 bpm 12,370 psi. 10:30 - 13:00 2.50 DRILL P PROD4 - Circ. t/ condition & balance mud in wellbore - Pump Rate; 330 gpm 13,750 psi. 13:00 - 22:00 9.00 DRILL P PROD4 - PJSM - POH wI 4" Dp, UD jts. wI bad hard band (Dp & HWDP) - No significant overpull at window (6,120'-6,108') - 84 jts 4" Dp & 8 jts. HWDP UD 22:00 - 00:00 2.00 DRILL P PROD4 - POH w/6 3/4" Directional BHA - PJSM wI Schlumberger before POH wI Radioactive Source - Clear floor of unnecessary personnel & remove source 1/13/2005 00:00 - 01 :00 1.00 DRILL P PROD4 - UD 6 3/4" Directional BHA 01 :00 - 02:00 1.00 CASE P PROD4 - Clear & Clean Rig Floor 02:00 - 02:30 0.50 CASE P PROD4 - Service Top Drive 02:30 - 05:00 2.50 CASE P PROD4 - P/U & M/U Whipstock Retrieving BHA - Retrieval Hook, 1 jt. HWDP, Float Sub, MWD, Bumper Sub, Oil Jar, XO, 24 jts. HWDP= 832.55' - Shallow Test MWD @ 830' - Pump Rate; 330 gpm 11000 psi. OK 05:00 - 08:00 3.00 CASE P PROD4 ,- RIH wI 4" Dp & Whipstock Retrieval BHA t/ 5,700' - SLM Dp in derrick while RIH - Fill Dp @ 3,200' Printed: 21712005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/13/2005 08:00 - 09:30 1.50 CASE P PROD4 - PJSM - Slip & Cut Drlg. Line 109:30 - 11 :00 1.50 I CASE P PROD4 - RIH t/6,090' wI Whpstck Ret'r BHA on 4" Dp , - Pump Rate; 250 gpm/1230 psi. 1- Strg. Wt; Up 130K, Dn. 102K 1- Orient'd Ret'r Hook, RIH t/6113' & latched Whpstck. - Pulled 30,000# Overpull & let Jars bleed off - Pull to 85,000# Overpull & released Anchor - POH 45' to 6,075' 11 :00 - 11 :30 0.50 CASE P I PROD4 - CBU @ 330 gpm/1 ,950 psi - Pump Off- Monitor Well- Static - B/O & BID Top Drive 11 :30 - 14:30 3.00 CASE P PROD4 - POH wI 4" DP 14:30 - 17:00 2.50 CASE P PROD4 - B/O & UD Whpstck Retrieving BHA & Whipstock - Whipstock showed mills came off @ 9 1/2' , rode high side fl 117:00 - 17:30 1 1/2' 0.50 CASE P PROD4 - Clear & Clean Rig Floor 17:30 - 23:00 5.50 CASE P PROD4 - PJSM - Remove Wear Ring, Install Test Plug & R/U tJ test - Test BOPE's tJ 250 psi low/3,500 psi high - Test witnessed by AOGCC rep. - RID Test Equip., Remove Test Plug & Install Wear Ring 23:00 - 00:00 1.00 P RUNPRD - PJSM , - R/U Liner running equip. & handling tools 1/14/2005 00:00 - 06:30 6.50 CASE P RUNPRD - Liner Running Procedure reviewed in PTSM - RIH wI 141 jts. 41/2" 12.6 # L-80 IBT Slotted Liner, 1 jt. 4 1/2" 12.6 # L-80 IBT Solid Liner (Bent) Shoe Jt. wI Guide Shoe, 1 jt. 4 1/2" 12.6# L-80 IBT Solid Liner under Hgr. 06:30 - 07:30 - Torque to preset make, Avg. MIU Torque 3,450 ftJlbs. 1.00 CASE P RUNPRD - CIO Elevators - MIU Hook Hgr, P/U 1 std. Dp & MIU Top Drive - Circ. 10 bbls through Hgr. @ 330 gpm I 275 psi. - B/O TD & Blow Dn. Same - Strg Wt. Up 100K, Dn. 90K 07:30 - 17:30 10.00 CASE P RUNPRD - RIH w/4 1/2" Liner on 4" Dp - Worked Centrilizers through window, Centrilizers hung up @ 17,800',8,470', 8,780' - Encountered difficulty RIH wI Liner, (corresponding Shoe Depth 10,300'). Beginning of Inverted section on Low Permability Zone of OBa @ 10,290'. ,- @ 11,604' began PIU single jts. Dp (1 x 1) & RIH, (giving ! more flexability to work string). Continue to work pipe Dn. tJ 12,082' - Did not latch HGR. Hook going through window @ 6,120' - Strg Wt. Up 190K, Dn. 40K 17:30 - 18:30 1.00 CASE P RUNPRD - Reciprocate pipe f/12,065' tJ 12,082', (free up liner string prior to attempting to hook Hgr). - Final Strg. Wt. Up 180K, Dn. 40K - MIU TD & apply 1/4 turn to right. Work pipe & S/O to latch Hgr. Hook @ 6,120'-successful - P/U tJ 190K & brk. string free, unlatch Hgr. Hook - S/O & relatch Hgr. Hook @ same mark, depth 6,120'. - B/O TD & drop 1 3/4" Baker ball. MIU TD Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/14/2005 17:30 - 18:30 1.00 CASE P RUNPRD - Circ Ball Dn. @ 4 bpm/530 psi., reduce rate tJ 2 bpm last 10 bbls. Total string vol. to ball seat = 55 bbls. 1- Seat ball & pressure up t/3,000 psi. (hold 5 min.) 1- Bleed off pressure tJ 0 psi. ! - P/U 30' to app. 6,090' to verify Running Tool released. Continue to POH t/6,030' 18:30 - 19:30 1.00' CASE P RUNPRD . - CBU @ 6,030' 1- Pump Rate; 355 gpm I 3,300 psi. - Strg. Wt. Up 125K, Dn. 108K - BIO TD & BID same 19:30 - 22:00 2.50 CASE P RUNPRD - POH wI 4" Dp & Liner Running Tool 22:00 - 22:30 0.50 CASE P RUNPRD - UD 4 1/2" Liner Running Tool ! - Make all service brks. as per Baker Rep. 22:30 - 23:00 0.50 CASE P RUNPRD - Clear & Clean Rig Floor 23:00 - 23:30 0.50 TIEBAC P OTHCMP - PJSM - R/U Liner Running Equip. & Handling Tools fl LEM # 2 23:30 - 00:00 0.50 CONDHL P OTHCMP - RIH wI LEM Assy. # 2 I I - 41/2" Seal Assy. 1 jt. 4 1/2" 12.6 # L-80 IBT Solid Liner 1/15/2005 00:00 - 01 :00 ' 1.00 TIEBAC 'P OTHCMP - RIH wI LEM Assy. #2 - P/U 3 ea. 4 1/2" 12.6# L-80 IBT Solid Liner jts., 3 ea. 4 1/2" 12.6# L-80 IBT Solid Liner Pup jts., 1 ea. Baker LEM Hgr., 1 IOTHCMP ea. Baker Seal Bore Assy. 01 :00 - 01 :30 0.50 TIEBAC P - PJSM - C/O Elevators 0.501 TIEBAC - Install False Bowl & R/U 27/8" handling tools 01 :30 - 02:00 P OTHCMP - Service Top Drive 02:00 - 05:00 3.00 TIEBAC P OTHCMP - P/U & RIH wI Circ. Nozzle Assy., 9 jts. 2 7/8" 7.7# Inner Wash String & 2 7/8" Pack-Off Assy. - Total Length = 281.11' - CIO Elevators - P/U & M/U Baker 5 1/2" x 7 5/8" ZXP L TP 05:00 - 05:30 0.50 TIEBAC i P OTHCMP . RID 2 7/8" Handling Tools 05:30 - 12:30 7.00 TIEBAC P OTHCMP - PJSM - RIH wI LEM #2 on 4" DP tJ 6,103' (top of Liner Hook Hgr) 12:30 - 15:00 2.50 TIEBAC P OTHCMP - MIU TD & Brk Circ. @ 3 bpml 570 psi. - Strg. Wt. Up 132K, Dn 111 K - Attempted to run LEM Assy. through Hgr. LEM window, wlo success, stacked out @ 6,122'. - PIU 20', turned string in increments of 1; 1/2; 1/4; 1/8 turns ¡attempting to RIH, wlo success, string stacked out @ 6,122'. Continued to attempt to run through LEM window with & without pumps wlo success. Rotate string @ 5 rpm (strg. torque 4K ftllbs) while slacking off through window area wlo success, stacked out @ 6,122' - BID Top Drive 15:00 - 17:30 2.50 TIEBAC N DPRB OTHCMP - POH wI 4" DP & LEM #2 17:30 - 18:00 0.50 TIEBAC N DPRB OTHCMP - PJSM - RIU False Bowl & 2 7/8" Handling Tools 18:00 - 20:00 2.00 TIEBAC N DPRB OTHCMP - UD ZXP L TP & 2 7/8" Pack-off Assy. - CIO Elevators - POH 2 7/8" Inner string (stand back in derrick) - UD 2 7/8" Circ. Nozzle Shoe Assy. Printed: 2/7/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/15/2005 18:00 - 20:00 20:00 - 20:30 20:30 - 21 :30 21 :30 - 22:30 22:30 - 23:00 23:00 - 00:00 1/16/2005 00:00 - 00:30 00:30 - 01 :00 01 :00 - 06:30 06:30 - 12:00 12:00 - 15:00 15:00 - 16:00 16:00 - 17:00 2.00 TIEBAC N 0.50 TIEBAC N 1.00 TIEBAC N I 1.00 ¡ TIEBAC IN 0.50 TIEBAC N I 1.00' TIEBAC N 0.50 TIEBAC N 0.50 TIEBAC N 5.50 TIEBAC N 5.50 TIEBAC N 3.00 TIEBAC N 1.00 TIEBAC N 1.00 TIEBAC N DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB 10THCMP I DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP I DPRB OTHCMP DPRB OTHCMP - No abnormal wear or marks on 2 7/8" Circ. Nozzle Shoe - C/O Elevators - RID 2 7/8" Equip. & Handling Tools - R/U 4 1/2" Equip. & Handling Tools - POH wI Seal Bore Assy., LEM Hook Hgr., Solid Liner, Seal 'Assy. - 4 1/2" Mule Shoe lightly scarred in 6 different places around outside perimeter of shoe. Suspect contact wI Collet Profile of Liner Hook Hgr. - RIH w/4 1/2" Bent Seal Assy. Jt. (bend 9' from shoe wI 6" off-set), 4 ea. 4 1/2" solid liner jts., 3 ea. 4 1/2" solid liner pup jts., LEM Hook Hgr, Seal Bore Assy. - CIO Elevators - RID 41/2" Equip. & Handling Tools - R/U 2 7/8" Equip. & Handling Tools - RIH w/2 7/8" Circ. Nozzle Assy. jt., 8 ea. 27/8" Tbg. jts., 5 ea. 2 7/8" Tbg. Pup jts., Pack-Off Assy. (total length = 279.21 ') - 2 7/8" Circ. Nozzle located 1.97' outside btm. of 4 1/2" Seal Assy. Mule Shoe - C/O Elevators - P/U & MIU ZXP L TP to 2 7/8" Inner String & 4 1/2" Outer String - MIU TD & Brk. Circ. @ 4 bpml 350 psi. - LEM Assy. Strg Wt. Up 45K, Dn. 50K - Service Top Drive - RIH wI LEM #2 on 4" Dp tJ 6,055' - Strg. Wt. Up 133K, Dn. 11 OK - RIH tJ 6,103', Tag'd Up on Top of Hook Hgr. Rotated string 1 turn & attempted to RIH wI LEM Assy. Through Liner Hook Hgr. LEM Window, Stacked Out @ 6,122'. MIU TD & brk. circ., 3 bpml 500 psi. Turned string in increments of 1; 1/2; 1/4; 1/8; turns attempting to exit LEM window wlo success. Continued to stack out @ 6,122'. Continued to attempt to exit LEM window. Occasionally the Mule Shoe Stacked Out @ 6,117', this depth corresponds with end of Hook Hgr. LEM Window. Continued to attempt to exit window using alternating braking actions & different running speeds wlo success. Rotated string at 5, 10, 20 rpm, Torque 4,500 ftJ Ibs while slacking off wlo success. - BID TO - POH wI LEM #2 on 4" Dp - SLM on trip out-no change in DP measurment - PJSM - B/O & UD ZXP L TP - POH w/2 7/8" Inner Wash String & stand back in derrick - Inspect & UD Circ. Nozzle Shoe Assy. - NO new addtional scarring or marks on Nozzle Shoe - POH & UD Seal Bore Assy., LEM, 3 ea. 41/2" Solid Liner pup jts. 3ea. 4 1/2" Solid Liner jts. - POH w/1 jt. liner & Bent Jt. Seal Assy. - 4 1/2" Mule Shoe had severe scarring from btm. of shoe up through first set of seals. Remove damaged mule shoe and seals fl bent jt. & replaced them with shoe and seals from the Printed: 21712005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/1 9/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 DPRB OTHCMP - RIH t/6,097', Tag'd Top of Liner Hgr. Rotated 1/4 turn & continued in hole to 6,117'. P/U above Liner Hgr. Top @ 6,097' & apply 1/4 turn in string and attempt to exit Liner Hook Hgr. LEM Window wlo success. Continue to work pipe and apply 1/4 turn increments for each P/U & S/O cycle for 2 full revolutions attempting to exit window wlo success. Still stacking out @ 6,117'. String hanging up @ 6,112 and then breaking loose when 5K Dn. Wt. applied. Suspect mule shoe oriented towards window, (btm. of Liner Hook Hgr. LEM exit window @ 6,111 '), but still unable to exit. Apply alternating braking action while slacking off trying to bounce mule shoe out window wlo success. Circ. @ 3 bpml 500 psi wI no effect. 1/16/2005 16:00 - 17:00 1.00 TIEBAC N DPRB 10THCMP I 17:00 - 17:30 0.501 TIEBAC N DPRB IOTHCMP 17:30 - 18:30 1.00 TIEBAC N DPRB OTHCMP 18:30 - 20:00 1.50 TIEBAC N DPRB OTHCMP I i 20:00 - 00:00 4.001 TIEBAC N DPRB OTHCMP 1/17/2005 00:00 - 00:30 0.50 TIEBAC N DPRB OTHCMP 00:30 - 03:00 2.50 TIEBAC IN I 03:00 - 04:00 I 1.00 TIEBAC N 04:00 - 08:00 4.001 TIEBAC N 08:00 - 10:00 2.00 TIEBAC N 10:00 - 11 :30 1.50 TIEBAC N 11 :30 - 16:30 5.00 TIEBAC N 16:30 - 17:30 1.00 TIEBAC N 17:30 - 21 :30 4.00 TIEBAC N 21 :30 . 00:00 2.50 TIEBAC N DPRB IOTHCMP I DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP DPRB OTHCMP orginal seal assy. jt which was not damaged during the first attempt to land LEM #2. - Clear & Clean Rig Floor - Remove Master bushings and vacum out old MOBM from drip , pan area. 1- RIH w/4 1/2" Bent Jt. wI reconditioned mule shoe and seals installed. 4ea.4 1/2" Solid jts., 3 ea. 4 1/2" Pup jts., LEM & new Seal Bore Assy wlo swivel - RIH w/2 7/8" Tbg. Inner string (total length = 275.16') - 2 7/8" Nozzle Shoe protruding .84' beyond btm. of 41/2" Mule Shoe - PIU ZXP L TP & M/U to 2 7/8" inner string & to 5 1/2" Seal Bore Assy. - RIH wI LEM #2 on 4" Dp t/5,225' - RIH wI LEM #2 on 4" Dp t/ 6,056' - Strg Wt. Up 132K, Dn. 11 OK - CBU @ 5 bpml 920 psi - Monitor Well, Static - Blow Dn Top Drive - POH wI LEM #2 assembly on 4" DP. . Change elevators and rack back 3 stds 2 7/8" inner string. - LD 41/2" tubing fl LEM #2. Inspect seal assembly - no obvious signs of scoring or other damage. All seals intact. . Discuss options wI Anchorage and agree way forward. Wait on additional tools to be delivered to site from Baker. Cleaning & general housekeeping while waiting. - RIH w/2 7/8" Tbg fl derrick and POH & UD same - PIU Baker "HR" Liner Running Tool Assy. & RIH on 4" Dp t/ 6,075' - Establish Working Parameters - Strg. Wt; Up 132K, Dn 120K, Rot. 130K - Rotary; 10 RPM @ 4,500 ftIlbs Torque - RIH t/6,097', Tagged Top of Liner Hook Hgr. Continued to RIH & btm'd out in "HR" profile of the Liner Hook Hgr. @ 6,116' - P/U 10' to verify Running tool engaged. S/O & stack 20,000# Dn. to verify Running Tool was seated in profile area. - SIO trying to break string free down, no success Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/17/2005 21 :30 - 00:00 2.50 TIEBAC N DPRB OTHCMP - P/U in 25,000# increments working pipe in attempt to free liner. @ 300,000# liner came free. Work pipe fl 6,107' tI 6,129' ("HR" Running Tool Depth) until constant hook loads were established @ Up WI. 185K & Dn. WI. 70K. - @ 6105' apply 1 1/2 turn, SIO and attemp to hang Liner Hook Hgr. wlo success. Repeated attempts were made w/1 , 3/4, -1/2, 114 turns being applied at different intervals while working string fl 6,107' tI 6,129', wlo success. These depth settings were established to keep the top of the Liner Hook Hgr. inside the window @ 6,108' while the "HR" Profile of the Liner Hook Hgr. was outside the window app. 9/10' @ 6,129'. - Install 6 turns in string and trap torque of 4,500 ftllbs. Work pipe through window area. No change in trapped torque. - Suspect dogs on "HR" Running Tool not engaging properly in , order to turn Hook Hgr. 1- P/U tI 5,990' & rotate string @ 10 rpm wI 6,500 ft.lbs. torque. ¡Torque being steady @ 6,500 ftllbs verifies that tool is turning, ,not the liner Hook Hgr. & 4 1/2" Slotted Liner 1/18/2005 I 00:00 - 02:00 2.00 TIEBAC N DPRB OTHCMP 1- Work Drlg. String fl 6,107' tI 6.129' attempting to hang Liner Hook Hgr. @ btm. of widow @ 6'120'. Rotating Dp. in 1/4 turn increments to change location of hook assy. in attempts to find window., wlo success. - Continue to work string while communicating wI Anc. personal on plan forward. - Decision was made to POH wI Hook Hgr. Assy. & 4 1/2 "Slotted Liner 02:00 - 06:00 4.00 TIEBAC N DPRB OTHCMP - POH wI Liner Hook Hgr. & 4 1/2" Slotted Liner I 06:00 - 07:00 1.00 I TIEBAC N DPRB OTHCMP Lay down hook hanger assembly. 07:00 - 08:30 1.50 I TIEBAC N DPRB OTHCMP Clean rig floor. Service rig and TDS. 08:30 - 11 :00 2.50 _ TIEBAC N DPRB OTHCMP , Discuss plan forward with Anchorage team. Rig up to lay down 4.5" liner. 11 :00 - 19:00 8.00 TIEBAC N DPRB OTHCMP Pull and lay down 4.5" liner. Salvage usable centralizers. 25 centralizers damaged beyond future use. 19:00 - 20:00 1.00 TIEBAC N DPRB OTHCMP i Rig down 4.5" liner equipment. Clear and clean rig floor. 20:00 - 21 :00 1.00 TIEBAC N DPRB OTHCMP Pick up mill assembly. 21 :00 - 23:00 2.00 TIEBAC N DPRB OTHCMP RIH with milling assembly. Tag no-go at 6,348'. 23:00 - 00:00 1.00 TIEBAC N DPRB OTHCMP Pull up to 6,113' and attempt to orient to window. Up Wt=125K Dn Wt=102K 1/19/2005 00:00 - 03:30 3.50 TIEBAC N DPRB OTHCMP Continue attempting to pass through window. Tried slow rotating while lowering pipe, cease rotation and advancing orientation by 1/4 turns and advancing orientation by 1/8 turns. No success. 03:30 - 06:00 2.50 TIEBAC N DPRB OTHCMP POH with mill assembly to change BHA configuration. 06:00 - 07:00 1.00 TIEBAC N DPRB OTHCMP Break out & LD BHA #24 components. 07:00 - 07:30 0.50 TIEBAC N DPRB OTHCMP Service top drive. 07:30 - 10:00 2.50 TIEBAC N DPRB OTHCMP PU components for BHA #25. Bullnose, 4" pup it, 4" bent it, 2 jts 4" DP, MWD, 9 jts 4", 2 ea string mills 6.75" OD, 1 jt 4" HWDP, jars, also 5 associated crossovers. Orient bent it with MWD. 10:00 - 11 :00 1.00 TIEBAC N DPRB OTHCMP RIH & shallow test MWD. 11 :00 - 13:30 . 2.50 TIEBAC N DPRB OTHCMP RIH to window depth at 6108'. ,13:30 - 14:30 I 1.00 TIEBAC N IDPRB OTHCMP Orient 15L with MWD. RIH & tag up on L 1 liner top. POH above Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/19/2005 13:30 - 14:30 1.00 TIEBAC N DPRB OTHCMP window and make 2 attempts RIH & POH with slow pipe rotation, trying to find window with a torque increase - no success. Orient bent joint @ 13R and go thru window into open hole. 14:30 - 15:30 1.00 TIEBAC N DPRB OTHCMP Work mills up & down thru window from 6102' to 6140' x5. Didn't see any indications that mills were doing any work downhole from torque or rotary indications. Make one pass without rotating and one pass without rotary or pump - no problems. 15:30 - 16:30 1.00 TIEBAC N DPRB OTHCMP Pull into shoe and circulate bottoms up. Inspect derrick for ice or other hazards. 16:30 -19:00 2.50 TIEBAC N DPRB ,OTHCMP Monitor well. Blow down TDS. POOH to BHA. 19:00 - 21 :00 2.00 TIEBAC N DPRB IOTHCMP Lay down Milling assemby and MWD (BHA # 25). 21 :00 - 21 :30 0.50 TIEBAC N DPRB 10THCMP Clear and clean rig floor. 21 :30 - 00:00 2.50 TIEBAC N DPRB OTHCMP PJSM. Rig up and run 4.5" liner as per running detail to 1246' 1/20/2005 00:00 - 04:30 4.50 TIEBAC N DPRB OTHCMP Continue to RIH with 4.5" liner as per detailed running procedure. 04:30 - 05:30 1.00 TIEBAC N DPRB OTHCMP Chg elevators. PU liner hook hanger and running tool. Up wt 95K Dn wt 87K. 05:30 - 06:30 1.00 TIEBAC N DPRB OTHCMP Run 4.5" liner on Drill Pipe down to window. 100k up. 90k down. 06:30 - 07:00 0.50 TIEBAC N DPRB OTHCMP Position shoe at mid point of window. Rotate 3 turns to right. 10THCMP Exit window on first attempt. 07:00 - 13:30 6.50 TIEBAC N DPRB Run slotted liner in open hole. Clean to 10420'. From here to i I TD, took weight in multiple spots but able to PU and work thru each time. Acted as if centralisers or couplings were hanging up in the window. 13:30 - 14:15 0.75 TIEBAC N DPRB OTHCMP PU last single of DP. Work pipe & improve PU & SO wts. PU 18' above hook point. Put in 3/4 turn - no success. 1/2 turn. No success. 1/4 turn - no success. Run deeper past calculated hook point and get hanger hooked 15' deeper than calculated. 14:15 -15:45 1.50 TIEBAC N DPRB OTHCMP Unhook & hook hanger at same depth x3. Rotate 1/4 turn and run past hook point. Rotate back 1/4 turn and hook x3. Unhook and rotate 1/2 turn. RIH - no hook. PU & rotate another 1/2 turn. RIH & land hook at same depth. Account for depth discrepancy in tally & verify hook depth is correct - OK. 15:45 - 16:30 0.75 TIEBAC N DPRB OTHCMP Load ball in drillpipe and pump down on seat. Pressure up to 2000 psi. PU &verify released from liner - OK. Continue pressuring up and shear ball seat at 3600 psi. Run back in and verify hanger is at same depth. 16:30 - 17:30 1.00 TIEBAC N DPRB OTHCMP POOH standing back Drill Collars to 5424'. 17:30 - 18:30 1.00 TIEBAC N DPRB OTHCMP PJSM. Slip and cut drill line. 18:30 - 21 :30 ' 3.00 TIEBAC N DPRB OTHCMP POOH (SLM). Lay down hanger running tool. Clear and clean rig floor. i 21 :30 - 23:30 2.00 TIEBAC N DPRB OTHCMP PJSM. Rig up and pick up LEM #2 23:30 - 00:00 0.50 TIEBAC N DPRB OTHCMP Change out handling equipment and pick up & run inner string. 1/21/2005 00:00 - 02:30 2.50 TIEBAC N DPRB OTHCMP Pick up and run inner string inside LEM assembly. 02:30 - 03:00 0.50 TIEBAC N SFAL OTHCMP While making up first stand of drill pipe onto LEM assembly, a 1/2" bolt, 2-1/4" long with a 3/4" head broke off of the iron roughneck and fell past the slips into the hole. Drained the stack and looked for the bolt without success. 03:00 - 05:00 2.00 TIEBAC N SFAL OTHCMP Gather the rig team, fisherman, LEM tech and ANC staff to Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/21/2005 03:00 - 05:00 2.00 TIEBAC N SFAL i OTHCMP discuss options with all parties. 05:00 - 06:00 1.00 TIEBAC N SFAL 'OTHCMP Bolt is now visible sitting in annular space between 7 5/8" casing and the liner top packer - laying sideways on tapered bore at top of wear ring. Call for magnet 1.75" 00. Will attempt to fish bolt out with this. Change plan as 1.75" magnet will be too big to go down to bolt. 06:00 - 09:30 3.50 TIEBAC N SFAL OTHCMP Use thin magnet from rig and attempt to retrieve bolt. Make I several unsuccessful attempts. Change to mechanics magnet - ,stronger. Run in and retrieve bolt which appeared to be almost brand new. 109:30 - 16:00 6.50 TIEBAC N DPRB OTHCMP RIH with LEM package on drill pipe 16:00 - 17:30 1.50 TIEBAC N DPRB OTHCMP Land LEM on hanger while circulating through workstring when ! seal assembly is entering SBR. Pick up 15K over to verify LEM is latched into hook hanger. 17:30 - 18:30 1.00 TIEBAC P OTHCMP Drop ball and pump down to seat. Pressure up to 3200 psi to set ZXP packer and hold pressure for 5 minutes. Increase I pressure to 4150 psi to release running tool. Bleed pressure to o psi. Close annular preventer and pressure test packer to 1500 psi for 10 minutes, good test. Pressure up drill pipe to 500 psi and pick up to observe pressure drop to 0 psi, OK. 18:30 - 22:30 4.00 TIEBAC P OTHCMP POOH with LEM running tools and inner string. 22:30 - 00:00 1.50 TIEBAC P OTHCMP Lay down running tools and inner string. 1/22/2005 00:00 - 01 :00 1.00 TIEBAC P OTHCMP Continue laying down LEM running equipment. 01 :00 - 02:00 1.00 TIEBAC P OTHCMP Rig down tubing equipment. Clean rig floor. 02:00 - 06:30 4.50 STWHIP P WEXIT PJSM. Pick up Whipstock assembly, MWD, drill collars and HWDP. Shallow test MWD. 06:30 - 10:30 4.00 STWHIP P WEXIT RIH with whipstock assembly, orient whipstock to 17L and set seals at 6063'. Set bottom anchor and shear off mills. 132K Up Wt. 107K Dn Wt. 10:30·12:15 1.75 STWHIP P WEXIT Displace SFOBM with warm (100 degrees) MOBM at 84 SPM, 112:15 - 12:30 1850 psi. Capture returned SFOBM into vac trucks for return to mud plant. 0.25 STWHIP P WEXIT Begin milling window. TOW at 5986'. 12:30 - 13:30 1.00 STWHIP P WEXIT Service rig and TDS. 13:30 - 15:30 2.00 STWHIP N RREP WEXIT Problem with TDS brake. Troubleshoot and repair. 15:30·20:30 5.00 STWHIP P WEXIT Resume milling operations. Mill window and 33' of formation to 6018'. TOW = 5986' BOW = 5998' 20:30 - 22:30 2.00 STWHIP P WEXIT Circulate bottoms up and pump a hi vis sweep around. Note-75 Ibs metal captured at surface during milling and circulating operations. 22:30 - 00:00 1.50 STWHIP P WEXIT POOH from 6018' to 5702'. 1/23/2005 00:00 - 02:00 2.00 STWHIP P WEXIT POOH from 5702' to BHA. 02:00 - 04:30 2.50 STWHIP P WEXIT Stand back HWDP and DC. Lay down milling BHA. 04:30 - 05:00 0.50 STWHIP P WEXIT Clean and clear rig floor. 05:00 - 06:30 1.50 BOPSUF P WEXIT Function and flush BOP stack. 06:30 . 08:30 2.00 STWHIP P WEXIT Pick up 6.75" drilling BHA. 08:30 - 09:30 1.00 STWHIP N RREP WEXIT Repair air valve on top drive. 09:30 - 10:30 1.00 STWHIP( WEXIT Continue PU BHA #27. PJSM & load nuclear source. 10:30·14:30 4.00 STWHIP P WEXIT RIH picking up singles drill pipe from shed. I Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: Rig Release: Rig Number: Spud Date: 12/29/2000 End: 2/3/2005 11/19/2004 2/3/2005 9ES 1/23/2005 14:30 - 15:00 15:00 - 19:00 19:00 - 20:00 20:00 - 00:00 1/24/2005 00:00 - 12:00 12:00 - 00:00 1/25/2005 00:00 - 08:30 08:30 - 09:00 09:00 - 12:00 12:00 - 00:00 1/26/2005 00:00 - 12:00 12:00 - 00:00 1/27/2005 00:00 - 03:30 03:30 - 04:00 04:00 - 05:00 05:00 - 08:00 08:00 - 20:30 20:30 - 23:00 23:00 - 23:30 0.50 STWHIP P 4.00 STWHIP P 1.00 STWHIP P WEXIT WEXIT WEXIT 4.00 DRILL P PROD5 12.00 DRILL P PROD5 12.00¡DRILL Ip PROD5 8.50 DRILL 0.50 DRILL 3.00 DRILL P P P PROD5 PROD5 PROD5 12.00 DRILL P PROD5 12.00 DRILL P PROD5 12.00 DRILL P PROD5 Shallow test MWD. RIH to above top of window at 5958'. Circulate to establish basline ECD. Orient BHA and pass through window. Directional drill 6.75" hole from 6018' to 6250'. PU wt 120K. SO Wt 105K. TVD 5137'. Directional drill 6.75" hole from 6250' to 7013'. UP wt 121K. Dn wt 92K. Rt wt 105K. TO on 5K. TO off 5K. ROT 80. ¡WOB 2K. 332 GPM. 2750 psi. AST 5.28. ART .7. ! Directional drill 6.75" hole from 7013' to 7974'. UP wt 118K. Dn wt 93K. Rt wt 100K. TO on 5-6K. TO off 5-6K. ROT 80. WOB 4K. 332 GPM. 2750 psi. AST 3.6. ART 3.16. i Calculated ECD = 10.00 to 10.10 Actual ECD = 10.4 to 10.52 Directional drill 6.75" hole from 7974' to 8874'. Circulate sweep around. Directional drill 6.75" hole from 8874' to 9030'. UP wt 123K. , Dn wt 88K. Rt wt 105K. TO on 7K. TO off 6K. ROT 80. ¡WOB 5K. 332 GPM. 3000 psi. AST .73. ART 3.27. Directional drill 6.75" hole from 9030' to 10,056'. UP wt 133K. Dn wt 91 K. Rt wt 107K. TO on 7K. TO off 6K. ROT 80. WOB 5K. 310 GPM. 3240 psi. AST 1.72. ART 3.31. Calculated ECD = 10.48 Actual ECD = 10.89 Continue drilling 6.75" hole 10,056' to 10,765' MD. 138 klbs up. 84 klbs down. 110 klbs rot. Torque: On btm 8 kit Ibs. Off btm 7 kit Ibs. 330 gpm @ 3380 psi. I Continue drilling 6.75" hole from 1 0,765' MD to 11,592'. ! 145 klbs up. 78 klbs down. 110 klbs rot. ¡Torque: On btm 8-9 kit Ibs. Off btm 7-8 kit Ibs. 330 gpm @ 3460 psi. Total for day - AST = 5.37 ART = 2.66 Calculated ECD = 10.61 Actual ECD = 10.80 PROD5 Continue drilling 6.75" hole from 11,592' to 11,943'. ECD at hardline. PROD5 CBU and sweep to clean hole and lower ECD PROD5 Continue drilling 6.75" hole from 11,943' to 12054'. Have difficulty sliding due to excessive drag. Decision made to TD hole at this point. AST = 1.15 ART = .75 PROD5 Circulate and condition hole for short trip. PROD5 POOH backreaming from 12,054' to 6798'. Tight spot at 10,867'. Worked through, cleaned up. PROD5 POOH I MAD pass from 6798' to 6084'. 80 rpm, 70spm, 250 gpm, 1900 psi. Pull up above window. PROD5 Make up and set RTTS at 50'. 3.50 DRILL P 0.50 DRILL P 1.00 DRILL P 3.00 DRILL P 12.50 DRILL P 2.50 DRILL P 0.50 DRILL P Printed: 217/2005 9:37:45 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: Rig Release: Rig Number: 11/19/2004 2/3/2005 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/27/2005 23:30 - 00:00 0.50 DRILL P PROD5 Pull wear bushing. Set test plug. Rig up and test BOPE. Witness of test waived by AOGCC Rep Jeff Jones. 1/28/2005 00:00 - 08:00 8.00 CASE P PROD5 Continue test BOPE's tI 250 psi lowl 3,500 psi high. Witness of test waived by AOGCC Rep., Jeff Jones. Choke line HCR valve failed test. Top drive upper IBOP failed test. 08:00 - 00:00 16.00 CASE N RREP PROD5 Replace choke line HCR - OK. Replace failed upper IBOP. When making up, the box of the new one swelled. Remove same and re-build previous one. 1/29/2005 00:00 - 03:00 3.00 CASE N RREP PROD5 Continue repairs to IBOP. Complete & test same to 250/3500 , psi - OK. 03:00 - 04:30 1.50 CASE P PROD5 Run in and retrieve storm packer and drillstring. Well static. LD RTTS. 04:30 - 09:30 5.00 CASE P PROD5 RIH to bottom - hole in good condition. Saw slight bobble at I 10867' but went straight on thru. 09:30 - 12:00 1 2.50 CASE P PROD5 Break circ & stage pumps up to 290 gpm. Pump 20 bbllow vis sweep followed by 20 bbl weighted sweep surf to surf. 285 gpm @ 3280 psi. 80 rpm. 12:00 - 14:00 2.00, CASE P PROD5 Displace well to 9.2 ppg solids free MOBM. 285 gpm @ 3200 psi. 80 rpm. CBU X2 to condition & warm mud. 14:00 - 18:30 4.50 CASE P PROD5 Monitor well. Static. POH to window racking back DP. Hole in good condition - no tight spots. 18:30 - 21 :00 2.50 CASE P PROD5 Cont POH LDDP to 3800'. 21 :00 - 22:00 . 1.00 CASE P PROD5 Service top drive & replace bolts on grabber. 22:00 - 00:00 2.00 CASE P PROD5 Continue POH to 2700' LDDP. 1/30/2005 00:00 - 03: 15 3.25 CASE P PROD5 Continue POH LDDP. 03:15 - 03:30 0.25 CASE P PROD5 PJSM for removing source from LWD tool. 03:30 - 06:30 3.00 CASE P PROD5 Remove RA source. LD BHA #27. Clear & clean rig floor. 106:30 - 08:00 1.50 WHIP P RUNPRD MU whipstock retrieval BHA. Orient and test MWD - OK. 108:00 -11:00 3.00 WHIP P RUNPRD RIH on 4" DP to recover whipstock. ,11.00 - 12.00 1.00 WHIP P RUNPRD Break circ & stage up to 300 gpm @ 1720 psi - 125k up, 102k down. Orient hook to 17L and engage hook into whipstock. Verify engaged. Pull 50 klbs over & let jars bleed off. Increase to 80 klbs over & release anchor - OK. 112:00 - 13:00 1.00 WHIP P RUNPRD CBU X2 - 300 gpm @ 1750 psi. Monitor well - static. Blow dn top drive. 13:00 - 16:00 3.00 WHIP P RUNPRD POH with whipstock. Rack back DP & HWDP. 16:00 - 18:30 2.50 WHIP P RUNPRD LD all whipstock retrieving tools & MWD. LD whipstock. 18:30 - 19:30 1.00 WHIP P RUNPRD Clear floor & clean drip pan under rotary table. 19:30 - 20:00 0.50 CASE P RUNPRD RU to run 4.5" liner 20:00 - 20:30 0.50 CASE P RUNPRD PJSM BPX, Doyon, Doyon Casing, MI. Run 4.5" liner. 20:30 - 00:00 3.50 CASE P RUNPRD Run 4.5" 12.6# L-80 IBTslotted liner. -80 jts in @ midnight. 1/31/2005 00:00 - 03:00 3.00 CASE P RUNPRD Continue running 4.5" slotted liner for L3 lateral. 127 jts slotted, swell packer, 9 solid, swell packer. 2 solid, hook hanger. 03:00 - 04:45 1.75 CASE P RUNPRD I MU hanger to 4" DP. Run in 1 std + 60' to middle of window. Rotate 3 turns & RIH. Tag previous liner top. Pull out above window and apply 1/4 turn. Run in and tag liner top again. Repeat and on 5th 1/4 turn , applied, exited window successfully. 04:45 - 12:30 7.75 CASE P RUNPRD Run liner into open hole on 4" DP to 11,735'. Saw no problems when running liner in open hole. 12:30 - 13:00 0.50 CASE P RUNPRD Get weights - 185 klbs up. 85 klbs dn. MU TD. RIH past hook point to 11812'. Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 1/31/2005 12:30 - 13:00 0.50 CASE P RUNPRD PU 20' and apply 1/4 turn @ surface. Run in and engage hook hanger to put shoe at 11,804'. PU & apply 1/2 turn. Run past hook depth. PU & apply another 1/2 turn. RIH & engage hook. Repeat x 2. Hanger is hooked on depth. 13:00 - 13:30 0.50 CASE P RUNPRD Drop setting ball & pump on seat - 4 bpm @ 650 psi. I Pressure up to 3500 psi & release from liner. PU & verify off liner, PI U Weight 132klbs - OK. PU 50'. 13:30 - 14:30 1.00 CASE P RUNPRD CBU x 2 above liner - 7 bpm @ 1,480 psi. Monitor well. Run in & tag liner on depth. Blow down top drive. 14:30 - 16:00 1.50 CASE P RUNPRD PJSM. Slip & cut drilling line. Service top drive. 16:00 - 19:00 3.00 CASE P RUNPRD POH with hook hanger running tool. 19:00 - 19:30 0.50 CASE P I RUNPRD LD liner running tool. 19:30 - 20:00 0.50 CASE P RUNPRD Clear floor & clean under rotary table. 20:00 - 20:45 0.75 CASE P TIEB3 . RU to run 4.5" LEM assembly #3. 20:45 - 21 :00 0.25 CASE P TIEB3 PJSM for running LEM. 21 :00 - 23:00 2.00 I CASE P TIEB3 MU LEM assembly #3 With inner string & setting tool on 1 std 4" DP. 23:00 - 23:30 0.50 CASE P TIEB3 Remove Anadrill pressure sensor from standpipe and plug outlet. 23:30 - 00:00 0.50 CASE P TIEB3 RIH with LEM assembly on 4" DP. 2/1/2005 00:00 - 04:00 4.00 CASE P TIEB3 RIH wI LEM Assembly #3 on 4" DP to 5,980'. Established Parameters: String Weight Up 135,000#, String Weight Down 122,000#. 04:00 - 05:00 1.00 CASE P TIEB3 05:00 - 06:00 1.00 CASE P TIEB3 06:00 - 06:30 0.50 CASE P TIEB3 06:30 - 10:00 3.50 CASE P TIEB3 10:00 - 10:30 0.50 CASE P TIEB3 10:30 - 14:30 4.00 CASE P TIEB3 M I U Top Drive, Washed Down Through Top of Hook Hanger. Continued to Wash Down into PBR on L2 LEM. Tagged Up 8' High on First 2 Attempts, Applied 1/4 Turn x 2 and Landed LEM Assembly. PI U wI 15,000# Overpull to Verify LEM Collet in Place. Dropped Setting Ball and Pumped onto Seat; ICR 4 bpm, 500 psi, FCR 1 bpm, 50 psi. Pressured Up to 4,000 psi to Release Running Tool and Set ZXP Liner Top Packer, Observed Good Indication on Surface of Packer Setting. Closed Upper Pipe Rams and Tested 7-5/8" and ZXP Packer to 1,500 psi f/15 Minutes, OK. Bled Down Pressure, Opened Rams. POOH w/3 Stands to 5,840'. Circulated to Condition Mud, Pump Rate 3 bpm, 500 psi. Waited on Brine Trucks. Held PJSM wI MI - Rig Crew - Truck Drivers - Tool Pusher - Drilling Supervisor. Displaced Wellbore to 9.3 ppg Brine; Pumped 25 bbls LVT from Pit #4, Shut Down to Clean Pit #4, Pumped 25 bbls 9.3 ppg Viscosified Brine - 50 bbls 9.3 ppg Brine w/1% Safe-Surf- 50 bbls 9.3 ppg Viscosified Brine - 300 bbls Clean 9.3 ppg Brine, Staged Up Pumps at the Following Rates: 3.5 bpm 600 psi 5.0 bpm 750 psi 6.0 bpm 1,100 psi Over Displaced By 50 bbls to Ensure Clean Wellbore Fluid. Printed: 2/7/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 10:30 - 14:30 4.00 CASE P 14:30 - 15:00 0.50 CASE P 15:00 - 16:00 1.00 CASE N RREP 16:00 - 23:30 7.50 CASE P 23:30 - 00:00 0.50 CASE P 00:00 - 02:00 2.00. CASE P 02:00 - 02:30 0.50 I CASE P 02:30 - 04:00 1.50 RUNCOrvP 04:00 - 06:00 2.00 RUNCOIVP 2/1/2005 21212005 06:00 - 14:00 14:00 - 15:00 15:00 - 17:00 17:00 - 18:30 18:30 - 19:30 19:30 - 20:00 20:00 - 21 :00 21 :00 - 22:00 22:00 - 00:00 2/3/2005 00:00 - 00:30 00:30 - 01 :00 8.00 RUNCOMP I I Monitored Well, Static. Blew Down Top Drive. Serviced Rig Repaired Top Drive POOH, LID 4" HWDP, 4-3/4" DC, 4" DP. RIH wI excess Dp in derrick POOH & LI D DP Clear'd & Clean'd Rig Floor Pull'd Wear Bushing RUNCMP PJSM R I U I-Wire Spooler, Overhead Sheaves, Tbg. Tongs & Hand Tools RUNCMP PJSM M I U 4-1/2" Tail Pipe: 4-1/2" Mule Shoe Assy wI 5.60" OD No-Go Locator - Lwr X Nipple Assy - Upper X Nipple Assy wI RHC-M Sleeve - 1 Jt 4-1/2" Tubing - 4-1/2" x 7 5/8" Premier Pkr - 7-5/8" Phoenix Jet Pump Gauge Assy - 4-1/2" Sliding Sleeve 7" Phoenix Discharge Pressure Gauge Assy. M I U and Tested I - Wire Connection. RUNCMP M I U and RIH wI 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to First 10 Joints, Then to Every Other Joint. Tested I - Wire Continuity Every 30 Joints. HMAN RUNCMP Pinched I - Wire on Tubing Slips, Broke Metal Casing. Cut and Spliced I - Wire. Tested Continuity - OK. RUNCMP M I U and RIH wI 4-1/2" 12.6# L-80 IBT-M Tubing. Average M I U Torque 3,250 ft Ilbs. M I U I - Wire Clamps to Every Other Joint. Tested I - Wire Continuity Every 10 Joints. I" RUNCMP M I U Jts. #135, #136 for Tag Up on No-Go in Tieback. String Wt. Up 97K, Dn 92K Tagged Up @ 16.53' in on Jt. #136, obtain measurements for Space Out. U D Jts. #136, #135, & #134. PIU & M/U Space Out Pups 9.80', 9.82', 7.82'. PIU Jt. #134, Tbg. Hgr. & Ldg. Jt. RUNCMP MIU I-Wire through Tbg. Hgr. and Test Integrety of fittings & Wire Continuity RUNCMP RIH & Land Hgr. in Tbg. Spool, Check landing marks to insure proper land out & RILDS RUNCMP MIU Circ. Lines to 7 5/8" x 4 1/2" Annulus & Ldg. Jt. Pressure Test Lines t/4,OOO psi. RUNCMP "Reverse Circ. 100 bbls. Corrosion Inhibited 9.3 Brine Dn. 75/8" I x 41/2" Annulus @ 3 bpm @ 200psi RUNCMP I Drop 1 7/8" BallI Rod Assy. & Pressure up on Tbg. t/ 4,200 I psi. to Set the Pkr. (hold 5 min.). Bleed pressure down to ] 3,500 psi. to Test Tbg. (hold 30 min.). Bleed pressure down to 12,500 psi. & shut in same. Pressure up the 7 518" x 4 1/2" ann. to 3,500 psi. (hold 30 min.). Bled pressure off Tbg. (2,500 psi) & allow pressure on the IA (3,500psi.) to shear DCK Valve. Bleed off all excess pressure. To insure opening of the DCK Valve Rev. Circ. Dn IA @ 3 bpm @ 900 psi. & then Dn Tbg @ 3 bpm @ 875 psi. RUNCMP Blow Dn. all Circ. Lines & RID same from IA & Ldg Jt. TIEB3 TIEB3 TIEB3 TIEB3 TIEB3 TIEB3 TIEB3 1.00 RUNCOM\J 2.00 RUNCOrvP 1.50 RUNCOI'v1P I 1.00 RUNCOrvP 0.50 RUNCOIVP 1.00 RUNCOrvP 1.00 RUNCOrvP 2.00 RUNCOrvP 0.50 RUNCOI'v1P 0.50 RUNCOMP RUNCMP UD Ldg. Jt., Set TWC in Tbg. Hgr. & Test from below t/1 ,000 psi. OK Printed: 217/2005 9:37:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 2/3/2005 01 :00 - 04:30 3.50 BOPSUP P OTHCMP PJSM NID BOPE, Remove Rotary Master Bushings & clean drip pan area. 04:30 - 08:30 4.00 WHSUR P OTHCMP PJSM I NIU Adapter Flange & Tree, Tested Neck Seal & void t/5,000 psi. Good Test I Test I-Wire Continuity- OK 08:30 - 09:00 0.50 WHSUR P OTHCMP R/U & Test Production Tree t/5,OOO psi. Good Test, RID test lines. 09:00 - 10:00 1.00 WHSUR P OTHCMP R/U DSM & Pull'd TWC, RID DSM 10:00 - 11 :00 1.00 WHSUR P OTHCMP PJSM R/U Little Red t/7 5/8" x 41/2" IA. Pressure Test lines t/ 3,000psi. 11 :00 - 12:30 1.50 WHSUR P OTHCMP Pump 100 bbls Diesel Freeze Protect @ 2 bpm @ 1,000 psi. 12:30 - 14:00 1.50 WHSUR P OTHCMP i U-Tube Diesel, 200 psi. on IA & Tbg. when done. Wellbore Fluid. Hydrostatic Pressure 2,132 psi. Formation Pressure 2,300 psi. 14:00 - 15:30 1.50 WHSUR P OTHCMP PJSM R/U DSM Lubricator, Set BPV., RID DSM. Tested BPV t/1 ,000 I psi. from below. OK. Little Red sucked excess diesel from lines 15:30 - 17:00 I & RID same 1.50 WHSUR P OTHCMP RID Secondary IA Valve, DSM Installed VR Plugs 17:00 - 18:00 1.00 WHSUR P OTHCMP Secured Well, Clear & Clean Cellar area. 18:00 - 00:00 6.00 WHSUR P RUNCMP Clean MOBM fl Dp Drain Racks, Drip Pans, All under floor containments, Misc. Rig Components. Rig Released @ 2400 hrs. on 2-3-05 Printed: 2/7/2005 9:37:45 AM S-213AL3 Survey Report Schlumberger Report Date: 1/27/2005 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 237.400' Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: S-PAD / S-213 TVD Reference Datum: Rotary Table Well: S-213 TVD Reference Elevation: 61.82 ft relative to MSL Borehole: S-213AL3 Sea Bed 1 Ground Level Elevation: 35.90 ft relative to MSL UWVAPI#: 500292299363 Magnetic Declination: 24.754' Survey Name 1 Date: S-213AL31 January 27, 2005 Total Field Strength: 57615.831 nT Tort 1 AHD 1 DDII ERD ratio: 401.833' 18462.772 ft / 6.903/1.687 Magnetic Dip: 80.846' Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: January 27,2005 Location Lat/Long: N 70.35551358, W 149.03415537 Magnetic Declination Model: BGGM 2004 . Location Grid NlE Y/X: N 5980549.840 ftUS, E 618929.960 ftUS North Reference: True North Grid Convergence Angle: +0.90963906' Total Corr Mag North -> True North: +24.754' Grid Scale Factor: 0.99991607 Local Coordinates Referenced To: Well Head I Comments Measured Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (II) (II) (II) (deg/100 It) (IIUS) (IIUS) Projected-Up 0.00 0.00 297.52 -61.82 0.00 -0.02 0.00 0.11 0.05 -0.10 0.00 5980549.89 618929.86 N 70.35551372 W 149.03415617 MWD+IFR:AK 155.42 0.08 297.52 93.60 155.42 -0.04 0.11 0.22 0.10 -0.20 0.05 5980549.94 618929.76 N 70.35551386 W 149.03415697 233.49 0.19 189.70 171.67 233.49 0.08 0.25 0.27 0.00 -0.27 0.29 5980549.84 618929.69 N 70.35551358 W 149.03415754 327.03 0.28 217.18 265.21 327.03 0.44 0.63 0.55 -0.33 -0.43 0.15 5980549.50 618929.53 N 70.35551266 W 149.03415888 415.75 0.46 188.45 353.93 415.75 1.00 1.19 1.06 -0.86 -0.62 0.29 5980548.97 618929.36 N 70.35551123 W 149.03416037 509.99 0.27 140.23 448.17 509.99 1.50 1.76 1.50 -1.40 -0.53 0.37 5980548.43 618929.45 N 70.35550974 W 149.03415966 602.31 0.35 136.82 540.48 602.30 1.76 2.26 1.79 -1.78 -0.20 0.09 5980548.06 618929.79 N 70.35550872 W 149.03415697 694.94 0.40 110.75 633.11 694.93 1.93 2.86 2.12 -2.10 0.30 0.19 5980547.75 618930.29 N 70.35550785 W 149.03415294 787.96 0.15 142.58 726.13 787.95 2.02 3.29 2.41 -2.31 0.68 0.31 5980547.54 618930.67 N 70.35550727 W 149.03414987 883.26 0.36 98.80 821 .43 883.25 2.05 3.70 2.67 -2.45 1.05 0.29 5980547.40 618931.05 N 70.35550687 W 149.03414686 976.53 0.43 98.44 914.70 976.52 1.97 4.34 3.06 -2.55 1.68 0.08 5980547.32 618931.68 N 70.35550661 W 149'0!lltr 1069.16 0.53 98.28 1007.32 1069.14 1.86 5.12 3.62 -2.66 2.45 0.11 5980547.22 618932.45 N 70.35550630 W 149.0 6 1160.63 0.56 78.60 1098.79 1160.61 1.59 5.98 4.23 -2.64 3.31 0.21 5980547.26 618933.31 N 70.35550638 W 149.034 850 1253.35 0.77 70.45 1191.50 1253.32 1.01 7.05 4.93 -2.34 4.34 0.25 5980547.57 618934.34 N 70.35550719 W 149.03412013 1347.39 1.25 70.29 1285.53 1347.35 0.03 8.71 6.16 -1.78 5.90 0.51 5980548.15 618935.89 N 70.35550871 W 149.03410745 1439.53 1.80 76.02 1377.64 1439.46 -1.30 11.16 8.32 -1.09 8.25 0.62 5980548.88 618938.23 N 70.35551059 W 149.03408837 1534.40 1.41 74.91 1472.47 1534.29 -2.67 13.82 10.83 -0.43 10.82 0.41 5980549.58 618940.79 N 70.35551241 W 149.03406747 1630.00 0.74 66.98 1568.05 1629.87 -3.68 15.61 12.53 0.12 12.53 0.72 5980550.16 618942.48 N 70.35551390 W 149.03405364 1723.15 2.46 259.23 1661.18 1723.00 -3.15 17.31 11.12 -0.02 11.12 3.42 5980550.00 618941.08 N 70.35551353 W 149.03406509 1814.13 6.28 254.60 1751.88 1813.70 0.38 24.24 4.72 -1.71 4.40 4.21 5980548.20 618934.39 N 70.35550892 W 149.03411964 1863.71 6.40 256.71 1801.15 1862.97 3.19 29.71 3.19 -3.06 -0.90 0.53 5980546.76 618929.10 N 70.35550522 W 149.03416271 1907.37 6.39 253.07 1844.54 1906.36 5.74 34.58 7.07 -4.33 -5.60 0.93 5980545.42 618924.43 N 70.35550175 W 149.03420081 2000.61 6.09 240.31 1937.24 1999.06 12.18 44.67 17.01 -8.29 -14.86 1.52 5980541 .32 618915.24 N 70.35549093 W 149.03427601 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( do31 rt-546 ) S-213\S-213\S-213AL3\S-213AL3 Generated 3/7/2005 1 :01 PM Page 1 of 8 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (II) (It) (II) (deg/100 It) (ltUS) (IIUS) 2095.16 5.63 239.01 2031.29 2093.11 19.22 54.32 26.66 -13.16 -23.19 0.51 5980536.31 618906.98 N 70.35547762 W 149.03434367 2187.42 5.36 237.61 2123.13 2184.95 25.81 63.16 35.49 -17.80 -30.71 0.33 5980531.56 618899.54 N 70.35546495 W 149.03440472 2282.02 5.13 235.24 2217.33 2279.15 32.44 71.80 44.13 -22.58 -37.91 0.33 5980526.66 618892.41 N 70.35545190 W 149.03446323 2375.30 7.07 239.64 2310.08 2371.90 39.88 81.71 54.03 -27.86 -46.29 2.14 5980521.25 618884.12 N 70.35543747 W 149.03453128 2469.73 12.17 244.54 2403.15 2464.97 50.80 97.48 69.77 -35.08 -60.31 5.47 5980513.81 618870.22 N 70.35541775 W 149.03464505 2503.22 14.39 244.19 2435.74 2497.56 55.96 105.17 77.44 -38.41 -67.24 6.63 5980510.37 618863.34 N 70.35540865 W 149.03470135 2532.82 15.76 243.38 2464.32 2526.14 61.19 112.87 85.12 -41.81 -74.14 4.68 5980506.86 618856.49 N 70.35539935 W 149.03475742 2562.81 17.56 242.48 2493.05 2554.87 67.12 121.46 93.71 -45.73 -81.80 6.06 5980502.82 618848.90 N 70.35538866 W 149.03481957 2591.90 19.43 241.38 2520.64 2582.46 73.60 130.69 102.94 -50.07 -89.94 6.54 5980498.35 618840.84 N 70.35537678 W 149.03488567 2628.07 19.93 240.84 2554.70 2616.52 82.28 142.87 115.12 -55.96 -100.60 1.47 5980492.30 618830.27 N 70.35536070 W 149.03497226 2655.84 20.53 241.04 2580.75 2642.57 89.14 152.48 124.72 -60.62 -109.00 2.17 5980487.50 618821.95 N 70.35534796 W 149.03.2 2686.92 21.45 241.15 2609.77 2671.59 97.08 163.61 135.85 -66.00 -118.74 2.96 5980481.97 618812.29 N 70.35533326 W 149.03 5 2718.71 22.14 240.27 2639.29 2701.11 105.54 175.41 147.66 -71.78 -129.04 2.40 5980476.03 618802.09 N 70.35531748 W 149.03520313 2749.91 23.21 238.46 2668.08 2729.90 114.37 187.44 159.68 -77.91 -139.38 4.09 5980469.73 618791.84 N 70.35530073 W 149.03528714 MWD+IFR:AK 2798.38 24.47 236.38 2712.41 2774.23 129.18 207.03 179.24 -88.46 -155.88 3.12 5980458.92 618775.52 N 70.35527190 W 149.03542112 Tie-In Survey 2856.54 26.47 236.45 2764.92 2826.74 148.37 232.04 204.19 -102.30 -176.72 3.44 5980444.76 618754.90 N 70.35523410 W 149.03559029 Blind ( Inc IAB+Trend) 2909.66 29.58 236.00 2811.80 2873.62 167.58 256.99 229.10 -116.18 -197.46 5.87 5980430.55 618734.39 N 70.35519619 W 149.03575870 Blind ( Inc IAB+ Trend) 3006.92 33.61 231.80 2894.64 2956.46 208.12 307.92 279.81 -146.26 -238.54 4.72 5980399.82 618693.80 N 70.35511399 W 149.03609224 MWD+IFR+MS 3102.80 37.72 227.46 2972.53 3034.35 254.98 363.79 335.10 -182.53 -281.03 5.03 5980362.89 618651.89 N 70.35501492 W 149.03643724 3199.21 41.06 226.91 3047.03 3108.85 307.61 424.97 395.51 -224.11 -325.89 3.48 5980320.61 618607.70 N 70.35490132 W 149.03680152 3295.21 43.34 232.11 3118.17 3179.99 361.63 489.42 459.65 -265.90 -374.94 4.34 5980278.05 618559.32 N 70.35478715 W 149.03719974 3392.93 45.61 237.12 3187.91 3249.73 415.45 557.86 528.06 -305.46 -430.75 4.28 5980237.60 618504.15 N 70.35467904 W 149.03765290 3488.29 44.79 237.13 3255.11 3316.93 466.84 625.52 595.67 -342.19 -487.58 0.86 5980199.98 618447.92 N 70.35457870 W 149.03811430 3584.58 45.23 235.98 3323.18 3385.00 518.99 693.62 663.75 -379.73 -544.40 0.96 5980161.55 618391.71 N 70.35447615 W 149.03857564 3680.92 44.69 235.88 3391.35 3453.17 571.61 761.69 731.81 -417.86 -600.79 0.57 5980122.53 618335.93 N 70.35437195 W 149.03903347 3776.78 45.06 236.81 3459.28 3521.10 623.56 829.33 799.43 -455.34 -657.08 0.79 5980084.16 618280.24 N 70.35426955 W 149.03949057 3873.18 44.60 236.48 3527.65 3589.47 675.54 897.29 867.38 -492.71 -713.85 0.53 5980045.90 618224.08 N 70.35416745 W 149.03995146 3968.74 44.05 237.25 3596.01 3657.83 726.45 964.06 934.13 -529.21 -769.76 0.81 5980008.53 618168.76 N 70.35406773 W 149.0iir 4064.79 43.64 237.36 3665.29 3727.11 776.84 1030.60 1000.63 -565.15 -825.75 0.43 5979971.70 618113.35 N 70.35396952 W 149.0 9 4160.95 43.86 238.30 3734.75 3796.57 826.80 1097.09 1067.08 -600.55 -882.04 0.71 5979935.42 618057.64 N 70.35387279 W 149.0 97 4257.35 43.42 238.37 3804.51 3866.33 876.40 1163.62 1133.54 -635.47 -938.67 0.46 5979899.60 618001.58 N 70.35377736 W 149.04177668 4348.86 43.94 237.59 3870.69 3932.51 923.78 1226.82 1196.70 -668.98 -992.25 0.82 5979865.25 617948.54 N 70.35368580 W 149.04221170 4446.91 43.12 237.35 3941.78 4003.60 974.80 1294.35 1264.21 -705.30 -1049.18 0.85 5979828.04 617892.20 N 70.35358657 W 149.04267393 4545.83 44.42 236.52 4013.21 4075.03 1026.92 1362.77 1332.63 -742.64 -1106.53 1.44 5979789.80 617835.46 N 70.35348455 W 149.04313946 4641.52 44.65 236.80 4081 .42 4143.24 1078.24 1429.89 1399.74 -779.52 -1162.59 0.32 5979752.03 617779.99 N 70.35338376 W 149.04359463 4737.67 43.99 236.28 4150.21 4212.03 1129.69 1497.06 1466.91 -816.56 -1218.64 0.78 5979714.11 617724.54 N 70.35328255 W 149.04404961 4831.97 43.63 236.15 4218.26 4280.08 1179.94 1562.34 1532.19 -852.86 -1272.89 0.39 5979676.96 617670.88 N 70.35318336 W 149.04449008 4928.03 44.71 235.59 4287.16 4348.98 1231.71 1629.28 1599.13 -890.41 -1328.29 1.20 5979638.53 617616.08 N 70.35308073 W 149.04493984 5023.20 44.27 235.98 4355.06 4416.88 1283.37 1695.97 1665.82 -927.92 -1383.45 0.54 5979600.16 617561.54 N 70.35297825 W 149.04538755 5119.83 43.93 235.90 4424.45 4486.27 1335.33 1763.21 1733.06 -965.58 -1439.16 0.36 5979561.62 617506.44 N 70.35287533 W 149.04583980 5216.82 44.04 234.58 4494.24 4556.06 1387.89 1830.57 1800.41 -1003.98 -1494.49 0.95 5979522.35 617451.73 N 70.35277039 W 149.04628899 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( do31 rt-546 ) S-213\S-213\S-213AL3\S-213AL3 Generated 3/7/2005 1 :01 PM Page 2 of 8 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) ( It) (II) (II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS) 5313.24 44.17 235.63 4563.47 4625.29 1440.36 1897.68 1867.50 -1042.37 -1549.53 0.77 5979483.10 617397.31 N 70.35266549 W 149.04673579 5409.71 43.74 235.73 4632.92 4694.74 1492.30 1964.63 1934.46 -1080.12 -1604.83 0.45 5979444.47 617342.62 N 70.35256232 W 149.04718470 5505.37 45.59 235.49 4700.95 4762.77 1544.50 2031.88 2001.70 -1118.10 -1660.32 1.94 5979405.62 617287.74 N 70.35245853 W 149.04763513 5602.48 48.31 234.89 4767.24 4829.06 1599.92 2102.83 2072.65 -1158.61 -1718.57 2.84 5979364.19 617230.14 N 70.35234781 W 149.04810801 5697.64 51.38 233.90 4828.60 4890.42 1657.35 2175.55 2145.34 -1200.96 -1777.69 3.32 5979320.91 617171.71 N 70.35223208 W 149.04858789 5793.44 54.39 235.09 4886.40 4948.22 1717.57 2251.94 2221.70 -1245.31 -1839.88 3.29 5979275.59 617110.24 N 70.35211089 W 149.04909269 MWD+IFR+MS 5889.06 57.95 233.06 4939.63 5001 .45 1780.56 2331.35 2301.07 -1291.93 -1904.17 4.12 5979227.96 617046.70 N 70.35198349 W 149.04961454 Tie-In Survey 5985.53 61.01 230.89 4988.62 5050.44 1848.27 2414.45 2383.97 -1343.13 -1969.60 3.72 5979175.73 616982.10 N 70.35184357 W 149.05014567 Top Window (Blind) 5986.00 61.03 230.88 4988.85 5050.67 1848.61 7912.97 2384.38 -1343.39 -1969.92 4.65 5979175.47 616981.78 N 70.35184286 W 149.05014826 Base Window (Blind) 5998.00 62.87 230.25 4994.49 5056.31 1857.38 7923.56 2394.93 -1350.12 -1978.10 16.02 5979168.61 616973.71 N 70.35182447 W 149.05021465 End Mill (Blind) 6018.00 64.64 230.75 5003.33 5065.15 1872.26 7941.50 2412.80 -1361.52 -1991.94 9.13 5979156.98 616960.05 N 70.35179329 W 149.0~.9 Blind (Inc IAB+Trend) 6030.60 65.79 231.08 5008.61 5070.43 1881.70 7952.94 2424.20 -1368.74 -2000.82 9.43 5979149.63 616951.29 N 70.35177359 W 149.05 07 Blind (Inc IAB+Trend) 6062.70 68.58 231.90 5021.06 5082.88 1905.95 7982.53 2453.71 -1387.16 -2023.97 9.00 5979130.85 616928.44 N 70.35172325 W 149.05058698 Blind (Inc IAB+Trend) 6095.09 71.86 232.70 5032.02 5093.84 1930.68 8013.00 2484.13 -1405.79 -2048.09 10.39 5979111.84 616904.62 N 70.35167232 W 149.05078271 Blind (Inc IAB+Trend) 6127.29 75.13 233.47 5041.17 5102.99 1955.48 8043.87 2514.97 -1424.33 -2072.77 10.41 5979092.91 616880.24 N 70.35162166 W 149.05098304 Blind ( Inc IAB+ Trend) 6159.01 78.46 234.20 5048.41 5110.23 1980.04 8074.75 2545.84 -1442.55 -2097.70 10.73 5979074.30 616855.61 N 70.35157186 W 149.05118538 Blind ( Inc IAB+Trend) 6190.06 82.53 234.90 5053.54 5115.36 2004.16 8105.36 2576.45 -1460.31 -2122.64 13.29 5979056.15 616830.95 N 70.35152333 W 149.05138783 First MWD+IFR+MS 6223.38 85.48 235.64 5057.02 5118.84 2030.01 8138.50 2609.58 -1479.18 -2149.87 9.12 5979036.84 616804.03 N 70.35147174 W 149.05160886 6255.40 87.88 239.04 5058.87 5120.69 2054.20 8170.46 2641.52 -1496.43 -2176.78 12.98 5979019.17 616777.40 N 70.35142461 W 149.05182726 6286.40 91.35 238.00 5059.08 5120.90 2077.24 8201.46 2672.48 -1512.61 -2203.21 11.69 5979002.57 616751.23 N 70.35138037 W 149.05204181 6318.97 95.16 237.00 5057.23 5119.05 2101.79 8233.97 2704.97 -1530.08 -2230.63 12.09 5978984.67 616724.09 N 70.35133263 W 149.05226437 6351.27 97.51 237.39 5053.67 5115.49 2126.15 8266.07 2737.06 -1547.47 -2257.61 7.37 5978966.86 616697.39 N 70.35128509 W 149.05248337 6383.58 98.93 236.29 5049.05 5110.87 2150.53 8298.05 2769.02 -1564.96 -2284.38 5.54 5978948.95 616670.91 N 70.35123729 W 149.05270065 6412.88 98.90 234.95 5044.51 5106.33 2173.00 8326.99 2797.97 -1581.31 -2308.27 4.52 5978932.23 616647.28 N 70.35119262 W 149.05289454 6444.10 101.02 232.34 5039.11 5100.93 2197.52 8357.74 2828.70 -1599.53 -2333.03 10.67 5978913.61 616622.82 N 70.35114281 W 149.05309552 6475.29 102.53 230.73 5032.74 5094.56 2222.53 8388.27 2859.15 -1618.52 -2356.94 7.00 5978894.25 616599.22 N 70.35109091 W 149.05328955 6506.77 102.28 227.23 5025.98 5087.80 2248.48 8419.02 2889.70 -1638.70 -2380.13 10.89 5978873.71 616576.35 N 70.35103577 W 149.05347778 6539.29 102.17 224.73 5019.09 5080.91 2276.15 8450.80 2921.05 -1660.78 -2402.98 7.52 5978851.26 616553.85 N 70.35097542 W 149.0lir 6570.44 100.46 223.89 5012.98 5074.80 2303.18 8481.34 2951.03 -1682.64 -2424.32 6.09 5978829.07 616532.87 N 70.35091569 W 149.0 9 6603.19 96.95 224.02 5008.02 5069.84 2331.91 8513.71 2982.78 -1705.94 -2446.78 10.72 5978805.42 616510.78 N 70.35085202 W 149.0 72 6634.08 93.54 224.09 5005.20 5067.02 2359.19 8544.47 3012.97 -1728.04 -2468.17 11.04 5978782.98 616489.74 N 70.35079161 W 149.05419228 6666.97 91.76 222.39 5003.68 5065.50 2388.54 8577.32 3045.14 -1751.98 -2490.67 7.48 5978758.70 616467.62 N 70.35072621 W 149.05437491 6698.95 92.10 219.09 5002.60 5064.42 2417.69 8609.28 3076.14 -1776.19 -2511.53 10.37 5978734.16 616447.16 N 70.35066004 W 149.05454416 6730.26 91.76 215.60 5001.55 5063.37 2446.93 8640.57 3106.01 -1801.06 -2530.51 11.19 5978708.99 616428.58 N 70.35059207 W 149.05469817 6762.91 92.58 212.20 5000.31 5062.13 2478.07 8673.20 3136.56 -1828.14 -2548.71 10.70 5978681.63 616410.82 N 70.35051809 W 149.05484580 6794.38 92.89 209.60 4998.81 5060.63 2508.52 8704.63 3165.42 -1855.11 -2564.85 8.31 5978654.41 616395.11 N 70.35044439 W 149.05497676 6826.92 93.65 208.96 4996.95 5058.77 2540.21 8737.12 3194.93 -1883.44 -2580.73 3.05 5978625.83 616379.67 N 70.35036697 W 149.05510566 6858.92 93.61 207.08 4994.93 5056.75 2571.50 8769.06 3223.69 -1911.64 -2595.74 5.86 5978597.40 616365.12 N 70.35028994 W 149.05522737 6891.33 93.41 208.34 4992.94 5054.76 2603.24 8801.41 3252.82 -1940.27 -2610.78 3.93 5978568.53 616350.53 N 70.35021168 W 149.05534940 6922.88 94.54 206.99 4990.75 5052.57 2634.12 8832.88 3281.20 -1968.15 -2625.39 5.57 5978540.43 616336.37 N 70.35013552 W 149.05546795 6955.16 94.99 203.45 4988.07 5049.89 2665.91 8865.05 3309.66 -1997.25 -2639.10 11.02 5978511.12 616323.13 N 70.35005601 W 149.05557912 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( do31 rt-546 ) S-213\S-213\S-213AL3\S-213AL3 Generated 31712005 1 :01 PM Page 3 of 8 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) (It) (II) (It) (It) (II) (It) (deg/100 II) (IIUS) (IIUS) 6987.42 93.17 200.50 4985.78 5047.60 2697.94 8897.22 3337.30 -2027.08 -2651.14 10.72 5978481.10 616311.56 N 70.34997449 W 149.05567676 7018.49 92.38 199.46 4984.27 5046.09 2728.92 8928.26 3363.48 -2056.25 -2661.74 4.20 5978451.78 616301.43 N 70.34989481 W 149.05576275 7049.51 92.69 198.50 4982.90 5044.72 2759.88 8959.25 3389.42 -2085.55 -2671.82 3.25 5978422.32 616291.81 N 70.34981474 W 149.05584448 7083.30 92.79 199.95 4981.28 5043.10 2793.59 8993.00 3417.83 -2117.42 -2682.93 4.30 5978390.28 616281.21 N 70.34972767 W 149.05593461 7115.23 92.24 197.89 4979.88 5041.70 2825.46 9024.90 3444.69 -2147.59 -2693.27 6.67 5978359.95 616271.35 N 70.34964522 W 149.05601848 7145.60 90.45 197.04 4979.17 5040.99 2855.82 9055.26 3469.91 -2176.55 -2702.39 6.52 5978330.85 616262.70 N 70.34956610 W 149.05609236 7178.37 90.45 197.16 4978.91 5040.73 2888.59 9088.03 3497.11 -2207.88 -2712.02 0.37 5978299.38 616253.56 N 70.34948052 W 149.05617048 7211.12 91.83 197.29 4978.26 5040.08 2921.33 9120.77 3524.42 -2239.15 -2721.72 4.23 5978267.96 616244.36 N 70.34939508 W 149.05624910 7242.53 91.62 197.52 4977.32 5039.14 2952.72 9152.17 3550.75 -2269.11 -2731.11 0.99 5978237.86 616235.45 N 70.34931322 W 149.05632524 7275.05 91.11 198.27 4976.54 5038.36 2985.22 9184.68 3578.24 -2300.04 -2741.10 2.79 5978206.77 616225.95 N 70.34922869 W 149.05640624 7306.26 91.17 197.63 4975.92 5037.74 3016.41 9215.88 3604.73 -2329.73 -2750.71 2.06 5978176.94 616216.81 N 70.34914759 W 149.0.1 7339.21 92.62 197.30 4974.83 5036.65 3049.34 9248.81 3632.62 -2361.14 -2760.60 4.51 5978145.38 616207.43 N 70.34906176 W 149.05 5 7370.55 92.13 197.80 4973.53 5035.35 3080.65 9280.12 3659.23 -2391.00 -2770.04 2.23 5978115.38 616198.46 N 70.34898019 W 149.05664090 7402.53 91.79 198.24 4972.44 5034.26 3112.60 9312.09 3686.62 -2421.39 -2779.93 1.74 5978084.83 616189.06 N 70.34889715 W 149.05672107 7434.94 91.14 197.96 4971.61 5033.43 3144.99 9344.48 3714.47 -2452.19 -2789.99 2.18 5978053.88 616179.49 N 70.34881301 W 149.05680269 7467.15 91.83 197.39 4970.78 5032.60 3177.18 9376.68 3742.10 -2482.87 -2799.77 2.78 5978023.06 616170.20 N 70.34872918 W 149.05688195 7499.01 92.17 196.83 4969.66 5031 .48 3209.02 9408.52 3769.34 -2513.30 -2809.14 2.06 5977992.48 616161.32 N 70.34864604 W 149.05695790 7530.39 91.93 196.82 4968.54 5030.36 3240.38 9439.88 3796.15 -2543.32 -2818.21 0.77 5977962.33 616152.72 N 70.34856402 W 149.05703149 7563.37 91.86 197.03 4967.45 5029.27 3273.34 9472.85 3824.44 -2574.85 -2827.81 0.67 5977930.65 616143.62 N 70.34847787 W 149.05710928 7595.14 91.55 195.43 4966.50 5028.32 3305.09 9504.60 3851.57 -2605.34 -2836.68 5.13 5977900.02 616135.23 N 70.34839456 W 149.05718123 7627.17 91.38 192.34 4965.69 5027.51 3337.07 9536.62 3878.29 -2636.42 -2844.37 9.66 5977868.83 616128.05 N 70.34830965 W 149.05724350 7659.32 91.42 190.84 4964.90 5026.72 3369.09 9568.76 3904.47 -2667.90 -2850.82 4.67 5977837.25 616122.09 N 70.34822363 W 149.05729581 7691.11 91.31 189.38 4964.14 5025.96 3400.67 9600.54 3929.97 -2699.19 -2856.40 4.60 5977805.88 616117.01 N 70.34813815 W 149.05734100 7723.25 92.72 188.19 4963.01 5024.83 3432.50 9632.66 3955.39 -2730.93 -2861.31 5.74 5977774.07 616112.61 N 70.34805143 W 149.05738072 7754.76 92.96 189.42 4961.45 5023.27 3463.68 9664.13 3980.39 -2762.03 -2866.13 3.97 5977742.90 616108.29 N 70.34796646 W 149.05741972 7786.82 92.96 188.83 4959.80 5021.62 3495.43 9696.15 4006.03 -2793.64 -2871.20 1.84 5977711.21 616103.71 N 70.34788010 W 149.05746084 7817.87 92.79 188.46 4958.24 5020.06 3526.15 9727.16 4030.79 -2824.30 -2875.86 1.31 5977680.48 616099.54 N 70.34779633 W 149.05749858 7851.72 93.37 187.99 4956.42 5018.24 3559.60 9760.96 4057.73 -2857.76 -2880.70 2.20 5977646.96 616095.23 N 70.34770494 W 149.0ilir 7882.85 94.03 186.04 4954.41 5016.23 3590.23 9792.03 4082.19 -2888.59 -2884.49 6.60 5977616.08 616091.93 N 70.34762071 W 149.0 2 7914.40 93.10 186.19 4952.45 5014.27 3621.20 9823.52 4106.76 -2919.90 -2887.85 2.99 5977584.72 616089.07 N 70.34753517 W 149.0 55 7947.02 91.86 185.18 4951.04 5012.86 3653.20 9856.10 4132.13 -2952.32 -2891.08 4.90 5977552.25 616086.36 N 70.34744657 W 149.05762165 7978.59 91.76 185.06 4950.04 5011.86 3684.13 9887.66 4156.61 -2983.75 -2893.89 0.49 5977520.78 616084.05 N 70.34736071 W 149.05764441 8011.01 91.62 185.13 4949.08 5010.90 3715.90 9920.06 4181.83 -3016.03 -2896.77 0.48 5977488.47 616081.68 N 70.34727253 W 149.05766767 8042.99 91.89 186.02 4948.10 5009.92 3747.28 9952.03 4206.97 -3047.84 -2899.88 2.91 5977456.61 616079.08 N 70.34718561 W 149.05769277 8075.08 92.21 184.77 4946.96 5008.78 3778.74 9984.10 4232.23 -3079.77 -2902.89 4.02 5977424.64 616076.57 N 70.34709839 W 149.05771714 8105.69 92.03 185.61 4945.82 5007.64 3808.73 10014.69 4256.34 -3110.23 -2905.66 2.80 5977394.14 616074.29 N 70.34701516 W 149.05773951 8137.82 92.17 184.80 4944.65 5006.47 3840.21 10046.80 4281.74 -3142.21 -2908.57 2.56 5977362.13 616071.89 N 70.34692781 W 149.05776305 8170.02 92.58 183.92 4943.31 5005.13 3871.66 10078.97 4306.99 -3174.29 -2911.02 3.01 5977330.01 616069.95 N 70.34684017 W 149.05778280 8202.34 93.34 184.85 4941.64 5003.46 3903.21 10111.25 4332.42 -3206.47 -2913.48 3.71 5977297.80 616067.99 N 70.34675225 W 149.05780273 8234.10 93.16 184.86 4939.84 5001.66 3934.27 10142.95 4357.65 -3238.06 -2916.17 0.57 5977266.17 616065.81 N 70.34666593 W 149.05782441 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL3\S-213AL3 Generated 3/7/2005 1 :01 PM Page 4 of 8 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (II) (It) ( It) (II) (It) (It) ( It) (deg/100 II) (ftUS) (IIUS) 8265.84 92.75 184.58 4938.21 5000.03 3965.29 10174.65 4382.91 -3269.65 -2918.78 1.56 5977234.54 616063.71 N 70.34657962 W 149.05784548 8298.57 92.68 185.47 4936.66 4998.48 3997.33 10207.35 4409.16 -3302.22 -2921.64 2.72 5977201.94 616061.36 N 70.34649065 W 149.05786862 8331.02 91.93 185.31 4935.35 4997.17 4029.14 10239.77 4435.39 -3334.50 -2924.69 2.36 5977169.62 616058.83 N 70.34640246 W 149.05789324 8362.47 90.90 185.74 4934.57 4996.39 4060.00 10271.21 4460.95 -3365.80 -2927.71 3.55 5977138.28 616056.30 N 70.34631697 W 149.05791771 8392.11 90.69 185.60 4934.16 4995.98 4089.10 10300.85 4485.16 -3395.29 -2930.64 0.85 5977108.75 616053.84 N 70.34623639 W 149.05794138 8426.07 90.18 186.03 4933.91 4995.73 4122.47 10334.81 4513.02 -3429.07 -2934.08 1.96 5977074.92 616050.93 N 70.34614409 W 149.05796919 8457.74 90.56 184.20 4933.70 4995.52 4153.51 10366.47 4538.86 -3460.61 -2936.90 5.90 5977043.34 616048.61 N 70.34605792 W 149.05799201 8489.94 91.38 182.83 4933.16 4994.98 4184.88 10398.67 4564.68 -3492.75 -2938.88 4.96 5977011.18 616047.15 N 70.34597013 W 149.05800793 8522.27 91.38 184.76 4932.38 4994.20 4216.40 10430.99 4590.77 -3525.00 -2941.02 5.97 5976978.91 616045.52 N 70.34588203 W 149.05802519 8553.98 91.14 183.57 4931.68 4993.50 4247.36 10462.69 4616.56 -3556.61 -2943.32 3.83 5976947.26 616043.72 N 70.34579565 W 149.05804377 8585.92 90.80 182.59 4931.14 4992.96 4278.42 10494.63 4642.26 -3588.50 -2945.04 3.25 5976915.35 616042.51 N 70.34570853 W 149.0.0 8618.19 90.93 182.86 4930.65 4992.47 4309.75 10526.89 4668.19 -3620.73 -2946.57 0.93 5976883.10 616041.49 N 70.34562048 W 149.0 4 8650.24 90.97 181.85 4930.12 4991.94 4340.82 10558.94 4693.89 -3652.75 -2947.89 3.15 5976851.07 616040.68 N 70.34553301 W 149.05 3 8681 .44 90.11 182.73 4929.83 4991.65 4371.06 10590.14 4718.97 -3683.92 -2949.13 3.94 5976819.88 616039.93 N 70.34544784 W 149.05809055 8714.76 89.32 184.61 4929.99 4991.81 4403.54 1 0623.46 4746.30 -3717.17 -2951.27 6.12 5976786.61 616038.33 N 70.34535701 W 149.05810775 8746.52 89.22 185.21 4930.40 4992.22 4434.65 10655.21 4772.80 -3748.81 -2953.98 1.92 5976754.93 616036.11 N 70.34527057 W 149.05812971 8777.94 89.05 182.79 4930.87 4992.69 4465.31 10686.63 4798.80 -3780.15 -2956.18 7.72 5976723.56 616034.42 N 70.34518495 W 149.05814739 8810.51 89.08 183.36 4931.40 4993.22 4496.98 10719.20 4825.53 -3812.67 -2957.92 1.75 5976691.02 616033.19 N 70.34509611 W 149.05816146 8842.28 87.68 183.15 4932.30 4994.12 4527.89 10750.95 4851.72 -3844.38 -2959.73 4.46 5976659.30 616031.89 N 70.34500949 W 149.05817600 8874.56 86.54 187.77 4933.93 4995.75 4559.52 10783.19 4879.04 -3876.46 -2962.79 14.72 5976627.17 616029.33 N 70.34492184 W 149.05820078 8906.71 86.16 186.84 4935.98 4997.80 4591.19 10815.28 4906.83 -3908.28 -2966.87 3.12 5976595.29 616025.76 N 70.34483490 W 149.05823378 8938.36 85.96 185.42 4938.15 4999.97 4622.24 10846.85 4933.90 -3939.68 -2970.24 4.52 5976563.85 616022.89 N 70.34474913 W 149.05826105 8970.53 85.92 186.33 4940.43 5002.25 4653.78 10878.94 4961.40 -3971.60 -2973.53 2.82 5976531.88 616020.11 N 70.34466192 W 149.05828760 9002.92 86.16 186.38 4942.67 5004.49 4685.58 10911.25 4989.27 -4003.71 -2977.10 0.76 5976499.72 616017.04 N 70.34457418 W 149.05831652 9034.75 86.95 187.90 4944.58 5006.40 4716.92 10943.03 5016.95 -4035.24 -2981.05 5.37 5976468.14 616013.59 N 70.34448806 W 149.05834847 9067.16 86.61 188.44 4946.40 5008.22 4748.94 10975.38 5045.47 -4067.27 -2985.65 1.97 5976436.04 616009.51 N 70.34440055 W 149.05838569 9098.87 87.37 188.49 4948.06 5009.88 4780.29 11007.05 5073.50 -4098.59 -2990.31 2.40 5976404.65 616005.34 N 70.34431498 W 149.05842342 9130.46 88.91 188.29 4949.09 5010.91 4811.54 11038.62 5101.47 -4129.82 -2994.92 4.92 5976373.35 616001.23 N 70.34422964 W 149.05846070 9162.47 88.57 189.25 4949.79 5011.61 4843.25 11070.62 5129.96 -4161.45 -2999.80 3.18 5976341.65 615996.86 N 70.34414323 W 149.0.9 9194.37 88.98 188.00 4950.48 5012.30 4874.84 11102.52 5158.35 -4192.98 -3004.58 4.12 5976310.05 615992.57 N 70.34405709 W 149.0 1 9226.50 89.22 186.95 4950.98 5012.80 4906.56 11134.64 5186.70 -4224.83 -3008.76 3.35 5976278.14 615988.90 N 70.34397006 W 149.05857272 9259.04 88.98 184.01 4951 .49 5013.31 4938.49 11167.18 5214.91 -4257.22 -3011.87 9.06 5976245.71 615986.31 N 70.34388159 W 149.05859783 9290.23 91.14 183.53 4951 .46 5013.28 4968.91 11198.37 5241.52 -4288.34 -3013.92 7.09 5976214.57 615984.75 N 70.34379657 W 149.05861437 9320.60 91.35 182.37 4950.80 5012.62 4998.42 11228.73 5267.25 -4318.66 -3015.48 3.88 5976184.23 615983.67 N 70.34371373 W 149.05862695 9351.69 91.00 181.44 4950.16 5011.98 5028.50 11259.81 5293.34 -4349.73 -3016.51 3.20 5976153.15 615983.13 N 70.34362886 W 149.05863523 9382.10 90.69 180.66 4949.71 5011.53 5057.80 11290.22 5318.67 -4380.13 -3017.07 2.76 5976122.75 615983.06 N 70.34354581 W 149.05863965 9413.59 89.77 180.73 4949.59 5011.41 5088.09 11321.71 5344.85 -4411.61 -3017.45 2.93 5976091.26 615983.18 N 70.34345979 W 149.05864265 9443.16 88.81 179.83 4949.95 5011.77 5116.47 11351.28 5369.36 -4441.18 -3017.60 4.45 5976061.70 615983.50 N 70.34337901 W 149.05864373 9475.32 89.84 180.13 4950.33 5012.15 5147.30 11383.44 5395.98 -4473.34 -3017.59 3.34 5976029.55 615984.02 N 70.34329116 W 149.05864353 9505.66 89.22 180.98 4950.58 5012.40 5176.46 11413.77 5421.32 -4503.68 -3017.88 3.47 5975999.21 615984.21 N 70.34320828 W 149.05864581 9536.25 88.98 181.64 4951.06 5012.88 5205.98 11444.36 5447.14 -4534.25 -3018.58 2.30 5975968.63 615984.00 N 70.34312474 W 149.05865139 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Sld( do31 rt-546 ) S-213\S-213\S-213AL3\S-213AL3 Generated 3/7/2005 1 :01 PM Page 5 of 8 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) (II) (II) (II) (II) (It) (II) (deg/100 II) (IIUS) (IIUS) 9566.58 89.70 181.27 4951.41 5013.23 5235.26 11474.69 5472.82 -4564.57 -3019.35 2.67 5975938.31 615983.71 N 70.34304192 W 149.05865754 9597.05 89.87 181.84 4951.52 5013.34 5264.69 11505.16 5498.71 -4595.03 -3020.18 1.95 5975907.84 615983.37 N 70.34295871 W 149.05866415 9625.82 89.12 180.99 4951.78 5013.60 5292.46 11533.93 5523.15 -4623.79 -3020.89 3.94 5975879.08 615983.11 N 70.34288014 W 149.05866982 9658.47 88.64 181.04 4952.42 5014.24 5323.92 11566.57 5550.82 -4656.43 -3021.47 1.48 5975846.44 615983.05 N 70.34279097 W 149.05867441 9689.03 88.71 179.83 4953.12 5014.94 5353.27 11597.12 5576.60 -4686.98 -3021.70 3.96 5975815.89 615983.30 N 70.34270751 W 149.05867619 9719.80 88.36 180.16 4953.91 5015.73 5382.75 11627.88 5602.47 -4717.74 -3021.70 1.56 5975785.13 615983.80 N 70.34262348 W 149.05867606 9752.02 88.67 178.89 4954.74 5016.56 5413.55 11660.09 5629.48 -4749.95 -3021 .43 4.06 5975752.94 615984.57 N 70.34253549 W 149.05867379 9781.86 89.39 179.35 4955.25 5017.07 5442.02 11689.93 5654.43 -4779.78 -3020.97 2.86 5975723.12 615985.51 N 70.34245399 W 149.05866998 9812.78 89.53 178.66 4955.54 5017.36 5471.50 11720.85 5680.30 -4810.69 -3020.43 2.28 5975692.22 615986.53 N 70.34236954 W 149.05866552 9843.42 89.12 179.70 4955.90 5017.72 5500.74 11751.48 5706.03 -4841.33 -3019.99 3.65 5975661.60 615987.46 N 70.34228585 W 149.05866186 9873.85 89.25 178.42 4956.33 5018.15 5529.76 11781.91 5731.60 -4871.75 -3019.50 4.23 5975631.19 615988.44 N 70.34220274 W 149.05_ 9905.24 89.49 179.61 4956.68 5018.50 5559.70 11813.30 5758.02 -4903.13 -3018.96 3.87 5975599.82 615989.48 N 70.34211700 W 149.05 9935.12 89.49 179.77 4956.95 5018.77 5588.29 11843.18 5783.40 -4933.01 -3018.79 0.54 5975569.96 615990.11 N 70.34203538 W 149.058 82 9965.48 88.81 179.33 4957.40 5019.22 5617.32 11873.53 5809.19 -4963.37 -3018.56 2.67 5975539.61 615990.83 N 70.34195245 W 149.05864978 9996.49 88.29 180.37 4958.18 5020.00 5647.02 11904.53 5835.65 -4994.36 -3018.47 3.75 5975508.62 615991.41 N 70.34186776 W 149.05864902 10030.36 90.04 179.96 4958.67 5020.49 5679.51 11938.40 5864.71 -5028.23 -3018.57 5.31 5975474.76 615991.85 N 70.34177525 W 149.05864970 10060.46 89.91 178.89 4958.69 5020.51 5708.27 11968.50 5890.38 -5058.33 -3018.27 3.58 5975444.67 615992.63 N 70.34169302 W 149.05864715 10091.84 89.60 180.13 4958.82 5020.64 5738.28 11999.88 5917.21 -5089.70 -3018.00 4.07 5975413.31 615993.39 N 70.34160730 W 149.05864487 10125.50 89.91 183.00 4958.97 5020.79 5770.79 12033.54 5946.64 -5123.35 -3018.92 8.58 5975379.65 615993.01 N 70.34151539 W 149.05865222 10157.44 90.18 181.47 4958.94 5020.76 5801.74 12065.48 5974.79 -5155.26 -3020.17 4.86 5975347.73 615992.27 N 70.34142820 W 149.05866222 10189.39 90.83 178.58 4958.66 5020.48 5832.37 12097.43 6002.38 -5187.21 -3020.18 9.27 5975315.79 615992.76 N 70.34134093 W 149.05866223 10221.64 90.63 179.42 4958.25 5020.07 5863.11 12129.67 6029.99 -5219.45 -3019.62 2.68 5975283.56 615993.84 N 70.34125285 W 149.05865756 10253.50 90.45 179.24 4957.95 5019.77 5893.55 12161.53 6057.40 -5251.31 -3019.25 0.80 5975251.72 615994.72 N 70.34116582 W 149.05865443 10285.28 89.60 179.73 4957.93 5019.75 5923.93 12193.31 6084.83 -5283.09 -3018.96 3.09 5975219.95 615995.51 N 70.34107900 W 149.05865201 10317.76 91.52 178.84 4957.62 5019.44 5954.94 12225.79 6112.84 -5315.56 -3018.55 6.52 5975187.49 615996.43 N 70.34099029 W 149.05864862 10349.79 92.13 177.80 4956.60 5018.42 5985.35 12257.80 6140.23 -5347.56 -3017.62 3.76 5975155.51 615997.87 N 70.34090287 W 149.05864090 10382.06 93.00 177.66 4955.15 5016.97 6015.87 12290.04 6167.68 -5379.77 -3016.34 2.73 5975123.33 615999.66 N 70.34081487 W 149.05863043 10413.94 93.72 177.58 4953.28 5015.10 6045.97 12321.86 6194.79 -5411.57 -3015.02 2.27 5975091.56 616001.49 N 70.34072800 W 149.05861960 10445.71 93.27 175.93 4951.35 5013.17 6075.81 12353.58 6221.59 -5443.23 -3013.22 5.37 5975059.93 616003.78 N 70.34064151 W 149.0.3 10478.05 92.27 176.21 4949.78 5011.60 6106.07 12385.88 6248.74 -5475.45 -3011.01 3.21 5975027.75 616006.51 N 70.34055348 W 149.0 86 10509.70 93.03 175.99 4948.32 5010.14 6135.70 12417.49 6275.37 -5507.00 -3008.86 2.50 5974996.25 616009.16 N 70.34046731 W 149.05856931 10541.40 93.44 172.58 4946.53 5008.35 6164.99 12449.14 6301.51 -5538.48 -3005.71 10.82 5974964.82 616012.81 N 70.34038129 W 149.05854364 10573.64 92.00 172.24 4945.00 5006.82 6194.37 12481.34 6327.57 -5570.40 -3001 .45 4.59 5974932.97 616017.57 N 70.34029409 W 149.05850903 10606.07 90.35 168.91 4944.34 5006.16 6223.52 12513.77 6353.23 -5602.38 -2996.14 11.46 5974901.08 616023.38 N70.34020673 W 149.05846585 10638.53 90.73 168.04 4944.03 5005.85 6252.16 12546.23 6378.25 -5634.19 -2989.66 2.92 5974869.39 616030.37 N 70.34011985 W 149.05841312 10669.63 90.15 165.44 4943.79 5005.61 6279.15 12577.32 6401.68 -5664.45 -2982.53 8.57 5974839.24 616037.98 N 70.34003717 W 149.05835515 10702.49 89.01 165.78 4944.03 5005.85 6307.33 12610.18 6426.08 -5696.28 -2974.36 3.62 5974807.55 616046.65 N 70.33995023 W 149.05828879 10734.65 89.77 162.17 4944.38 5006.20 6334.43 12642.34 6449.40 -5727.19 -2965.48 11.47 5974776.79 616056.02 N 70.33986582 W 149.05821667 10765.02 89.36 161.08 4944.61 5006.43 6359.33 12672.71 6470.63 -5756.01 -2955.91 3.83 5974748.13 616066.05 N 70.33978709 W 149.05813891 10797.46 89.63 157.51 4944.89 5006.71 6385.15 12705.15 6492.42 -5786.34 -2944.44 11.04 5974717.98 616077.99 N 70.33970422 W 149.05804577 10829.78 90.49 154.82 4944.86 5006.68 6409.77 12737.47 6512.89 -5815.91 -2931.39 8.74 5974688.63 616091.52 N 70.33962348 W 149.05793971 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL3\S-213AL3 Generated 3/7/2005 1 :01 PM Page 6 of 8 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) ( deg) (deg) (II) (II) (II) (II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS) 10861.91 90.39 153.38 4944.61 5006.43 6433.48 12769.60 6532.43 -5844.81 -2917.35 4.49 5974659.96 616106.01 N 70.33954454 W 149.05782576 10894.01 90.28 151.27 4944.42 5006.24 6456.49 12801.70 6551.26 -5873.23 -2902.44 6.58 5974631.78 616121.36 N 70.33946690 W 149.05770471 1 0925.48 89.12 149.56 4944.59 5006.41 6478.30 12833.17 6568.96 -5900.60 -2886.91 6.57 5974604.67 616137.33 N 70.33939215 W 149.05757857 10957.21 89.49 148.70 4944.97 5006.79 6499.77 12864.89 6586.32 -5927.83 -2870.63 2.95 5974577.70 616154.04 N 70.33931778 W 149.05744640 10989.97 89.32 146.52 4945.31 5007.13 6521.29 12897.65 6603.63 -5955.49 -2853.08 6.67 5974550.32 616172.02 N 70.33924223 W 149.05730395 11019.59 89.08 144.67 4945.73 5007.55 6539.95 12927.27 6618.49 -5979.92 -2836.35 6.30 5974526.16 616189.14 N 70.33917549 W 149.05716810 11051.23 89.39 141.88 4946.15 5007.97 6558.87 12958.91 6633.35 -6005.28 -2817.43 8.87 5974501.11 616208.45 N 70.33910624 W 149.05701454 11083.64 89.05 140.71 4946.59 5008.41 6577.34 12991.31 6647.70 -6030.57 -2797.17 3.76 5974476.15 616229.12 N 70.33903718 W 149.05685006 11116.05 89.15 141.09 4947.10 5008.92 6595.63 13023.72 6661.98 -6055.72 -2776.73 1.21 5974451.33 616249.95 N 70.33896850 W 149.05668416 11147.47 88.94 141.81 4947.62 5009.44 6613.61 13055.13 6676.21 -6080.29 -2757.15 2.39 5974427.08 616269.91 N 70.33890140 W 149.05652524 11179.62 89.36 142.04 4948.10 5009.92 6632.23 13087.28 6691.13 -6105.59 -2737.33 1.49 5974402.09 616290.13 N 70.33883228 W 149.0.2 11211.74 89.53 140.06 4948.41 5010.23 6650.42 13119.40 6705.72 -6130.57 -2717.14 6.19 5974377.44 616310.72 N 70.33876407 W 149.0 4 11243.62 90.73 140.52 4948.34 5010.16 6668.13 13151.28 6719.95 -6155.09 -2696.77 4.03 5974353.24 616331.47 N 70.33869709 W 149.056 12 11275.24 90.32 141.67 4948.05 5009.87 6686.07 13182.90 6734.58 -6179.70 -2676.91 3.86 5974328.96 616351.71 N 70.33862989 W 149.05587394 11307.10 89.84 140.09 4948.00 5009.82 6704.04 13214.76 6749.33 -6204.41 -2656.81 5.18 5974304.57 616372.20 N 70.33856239 W 149.05571078 11339.34 89.43 139.15 4948.21 5010.03 6721.63 13247.00 6763.74 -6228.97 -2635.93 3.18 5974280.34 616393.47 N 70.33849531 W 149.05554125 11371.68 89.22 136.38 4948.59 5010.41 6738.40 13279.33 6777.38 -6252.91 -2614.19 8.59 5974256.75 616415.58 N 70.33842993 W 149.05536485 11403.79 89.56 134.96 4948.93 5010.75 6754.03 13311.44 6789.98 -6275.88 -2591.75 4.55 5974234.15 616438.38 N 70.33836721 W 149.05518275 11436.18 89.49 137.69 4949.20 5011.02 6770.11 13343.83 6803.16 -6299.30 -2569.39 8.43 5974211.08 616461.11 N 70.33830324 W 149.05500124 11467.84 89.67 136.40 4949.43 5011.25 6786.18 13375.49 6816.53 -6322.48 -2547.82 4.11 5974188.26 616483.05 N 70.33823996 W 149.05482615 11499.81 89.84 136.71 4949.57 5011.39 6802.18 13407.46 6829.90 -6345.69 -2525.83 1.11 5974165.40 616505.39 N 70.33817657 W 149.05464773 11532.04 89.01 134.77 4949.89 5011.71 6817.90 13439.69 6843.09 -6368.77 -2503.34 6.55 5974142.68 616528.25 N 70.33811354 W 149.05446519 11565.07 89.18 132.75 4950.42 5012.24 6833.00 13472.71 6855.69 -6391.61 -2479.49 6.14 5974120.23 616552.46 N 70.33805116 W 149.05427161 11596.70 88.81 127.50 4950.97 5012.79 6845.65 13504.34 6866.01 -6411.98 -2455.32 16.64 5974100.24 616576.95 N 70.33799552 W 149.05407544 11628.70 88.33 127.50 4951.77 5013.59 6857.10 13536.33 6875.19 -6431.46 -2429.94 1.50 5974081.17 616602.63 N 70.33794234 W 149.05386949 11660.96 89.97 129.75 4952.25 5014.07 6869.22 13568.58 6885.18 -6451.59 -2404.74 8.63 5974061.45 616628.14 N 70.33788736 W 149.05366500 11692.22 88.84 126.53 4952.57 5014.39 6880.73 13599.84 6894.75 -6470.89 -2380.16 10.92 5974042.54 616653.03 N 70.33783465 W 149.05346553 11724.49 89.12 127.73 4953.15 5014.97 6892.07 13632.11 6904.22 -6490.37 -2354.43 3.82 5974023.47 616679.05 N 70.33778147 W 149.05325678 11755.64 89.05 126.39 4953.64 5015.46 6902.99 13663.25 6913.45 -6509.14 -2329.58 4.31 5974005.10 616704.20 N 70.33773021 W 149.0.10 11787.14 89.63 126.40 4954.01 5015.83 6913.69 13694.75 6922.57 -6527.82 -2304.23 1.84 5973986.82 616729.84 N 70.33767918 W 149.0 36 11819.48 90.49 127.32 4953.97 5015.79 6924.92 13727.09 6932.32 -6547.22 -2278.35 3.89 5973967.84 616756.02 N 70.33762620 W 149.05263938 11852.10 90.21 127.87 4953.77 5015.59 6936.64 13759.71 6942.69 -6567.12 -2252.51 1.89 5973948.35 616782.18 N 70.33757186 W 149.05242966 11883.63 89.19 130.64 4953.94 5015.76 6948.81 13791.24 6953.70 -6587.07 -2228.09 9.36 5973928.79 616806.90 N 70.33751738 W 149.05223156 11915.13 90.21 133.62 4954.10 5015.92 6962.42 13822.74 6966.29 -6608.20 -2204.74 10.00 5973908.04 616830.59 N 70.33745968 W 149.05204201 11947.79 91.18 134.07 4953.71 5015.53 6977.40 13855.40 6980.36 -6630.82 -2181.18 3.27 5973885.80 616854.50 N 70.33739790 W 149.05185087 11979.40 90.18 137.23 4953.33 5015.15 6992.77 13887.00 6994.98 -6653.42 -2159.09 10.48 5973863.55 616876.94 N 70.33733617 W 149.05167159 Last MWD+IFR+MS 11997.05 90.01 137.90 4953.30 5015.12 7001 .87 13904.65 7003.71 -6666.45 -2147.18 3.92 5973850.72 616889.06 N 70.33730060 W 149.05157494 TD (Projected lAB) 12054.00 88.97 137.90 4953.81 5015.63 7031.50 13961.60 7032.39 -6708.70 -2109.00 1.83 5973809.08 616927.90 N 70.33718520 W 149.05126511 Survey Type: Definitive Survey NOTES: MWD + IFR : AK - ( MWD + IFR [Alaska] -- In-field referenced MWD in Alaska. Model takes account of increased violence of magnetic field disturbances in Alaska. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) S-213\S-213\S-213AL3\S-213AL3 Generated 3/7/2005 1 :01 PM Page 7 of 8 I M~eS~~ed I Inclination I Azimuth I Sub-Sea TVD I TVD I ~:~~:~ I ~~~~:u~~ I Closure INS EW I DLS I (II) (deg) (deg) (It) (II) (II) (II) (II) (II) (II) (deg/1001l) MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Comments Leqal Description: Surface: 4346 FSL 4500 FEL S35 T12N R12E UM Tie-In: 4346 FSL 4500 FEL S35 T12N R12E UM BHL: 2917 FSL 1337 FEL S3 T11 N R12E UM Northinq ey) rftUSl 5980549.84 5980549.89 5973809.48 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) Eastinq eX) rttUSl 618929.96 618929.86 616928.48 S-213\S-213\S-213AL3\S-213AL3 Northing (IIUS) Easting Latitude Longitude (IIUS) . . Generated 3/7/2005 1 :01 PM Page 8 of 8 ~ SCHLUMBERGER Survey report Client. ....... ......... ..: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . _ .: Polaris Well. . . . . . . . . . . . . . . . . . . . .: S-213AL3 API number...............: 50-029-22993-63 Engineer.................: S. Moy RIG..... .................: Doyon 16 STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.. ...: Minimum curvature Method for DLS.... ...._ ..: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Depth GL above permanent.......: 35.90 ft KB above permanent.......: N/A Top Drive DF above permanent..... ..: 61.82 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from rotary table to target: 237.4 degrees [(c)2005 IDEAL ID8_1C_02] 8-Feb-2005 18:32:02 Spud date................: Last survey date. . . . . . . . . : Total accepted surveys...: MD of first survey.......: MD of last survey........: Page 1 of 10 23-Nov-04 08-Feb-05 265 0.00 ft 12160.00 ft . ----- Geomagnetic data ---------------------- Magnetic model..... ......: BGGM version 2004 Magnetic date............: 15-Dec-2004 Magnetic field strength..: 1152.25 HCNT Magnetic dec (+E/W-).....: 24.81 degrees Magnetic dip.............: 80.85 degrees ----- MWD survey Reference Reference G..............: Reference H.. ............: Reference Dip. ...........: Tolerance of G...........: Tolerance of H...........: Tolerance of Dip.........: Criteria --------- 1002.68 mGal 1152.25 HCNT 80.85 degrees (+/-) 2.50 mGal (+/-) 6.00 HCNT (+/-) 0.45 degrees . ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.81 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.81 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction :20v(-~/7 SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 Page 2 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 1 2 3 4 5 0.00 155.42 233.49 327.03 415.75 6 7 8 9 10 509.99 602.31 694.94 787.96 883.26 11 12 13 14 15 976.53 1069.16 1160.63 1253.35 1347.39 16 17 18 19 20 1439.53 1534.40 1630.00 1723.15 1814.13 21 22 23 24 25 1863.71 1907.37 2000.61 2095.16 2187.42 26 27 28 29 30 2282.02 2375.30 2469.73 2503.22 2532.82 0.00 0.08 0.19 0.28 0.46 0.27 0.35 0.40 0.15 0.36 0.43 0.53 0.56 0.77 1. 25 1. 80 1. 41 0.74 2.46 6.28 6.40 6.39 6.09 5.63 5.36 5.13 7.07 12.17 14.39 15.76 297.52 297.52 189.70 217.18 188.45 140.23 136.82 110.75 142.58 98.80 98.44 98.28 78.60 70.45 70.29 76.02 74.91 66.98 259.23 254.60 256.71 253.07 240.31 239.01 237.61 235.24 239.64 244.54 244.19 243.38 [(c)2005 IDEAL ID8_1C_02] 0.00 155.42 78.07 93.54 88.72 94.24 92.32 92.63 93.02 95.30 93.27 92.63 91.47 92.72 94.04 92.14 94.87 95.60 93.15 90.98 49.58 43.66 93.24 94.55 92.26 94.60 93.28 94.43 33.49 29.60 0.00 155.42 233.49 327.03 415.75 509.99 602.30 694.93 787.95 883.25 976.52 1069.14 1160.61 1253.32 1347.35 1439.46 1534.29 1629.87 1723.00 1813 .70 1862.97 1906.36 1999.05 2093.11 2184.95 2279.15 2371.90 2464.97 2497.56 2526.14 0.06 0.11 0.23 0.54 0.98 1. 20 1.12 0.88 0.67 0.44 -0.04 -0.63 -1.37 -2.40 -4.01 -6.36 -8.89 -10.62 -9.36 -2.79 2.41 7.05 16.98 26.63 35.46 44.11 54.01 69.70 77.34 84.99 0.05 0.10 -0.00 -0.34 -0.86 -1. 41 -1. 78 -2.10 -2.31 -2.46 -2.55 -2.67 -2.64 -2.34 -1. 78 -1. 09 -0.43 0.12 -0.02 -1. 71 -3.06 -4.33 -8.29 -13 .16 -17.80 -22.58 -27.86 -35.08 -38.41 -41. 81 -0.10 -0.20 -0.27 -0.43 -0.61 -0.53 -0.20 0.30 0.68 1. 05 1. 69 2.45 3.31 4.34 5.90 8.25 10.83 12.53 11.12 4.40 -0.90 -5.60 -14.86 -23.19 -30.71 -37.91 -46.29 -60.30 -67.24 -74.14 0.11 0.22 0.27 0.55 1. 06 1. 50 1. 79 2.12 2.41 2.67 3.06 3.62 4.23 4.93 6.17 8.33 10.83 12.53 11.12 4.72 3.19 7.08 17.01 26.66 35.49 44.13 54.03 69.77 77.44 85.12 296.57 297.04 269_51 231.93 215.45 200.55 186.27 171.86 163.66 156.87 146.57 137.38 128.56 118.33 106.81 97.56 92.28 89.47 90.11 111. 22 196.41 232.26 240.83 240.42 239.90 239.22 238.96 239.81 240.26 240.58 DLS (deg/ 100f) 0.00 0.05 0.29 0.15 0.29 0.37 0.09 0.19 0.31 0.29 0.08 0.11 0.21 0.25 0.51 0.62 0.41 0.72 3.42 4.21 0.53 0.93 1. 52 0.51 0.33 0.33 2.14 5.47 6.63 4.68 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ TIP None MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK . MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK . MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Page 3 of 10 Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 31 32 33 34 35 2562.81 2591.90 2628.07 2655.84 2686.92 36 37 38 39 40 2718.71 2749.91 2798.38 2856.54 2909.66 41 42 43 44 45 3006.92 3102.80 3199.21 3295.21 3392.93 46 47 48 49 50 3488.29 3584.58 3680.92 3776.78 3873.18 51 52 53 54 55 3968.74 4064.79 4160.95 4257.35 4348.86 56 57 58 59 60 4446.91 4545.83 4641. 52 4737.67 4831.97 17.56 19.43 19.93 20.53 21. 45 22.14 23.21 24.47 26.47 29.58 33.61 37.72 41.06 43.34 45.61 44.79 45.23 44.69 45.06 44.60 44.05 43.64 43.86 43.42 43.94 43.12 44.42 44.65 43.99 43.63 242.48 241.38 240.84 241. 04 241.15 240.27 238.46 236.38 236.45 236.00 231.80 227.46 226.91 232.11 237.12 237.13 235.98 235.88 236.81 236.48 237.25 237.36 238.30 238.37 237.59 237.35 236.52 236.80 236.28 236.15 [(c)2005 IDEAL ID8_1C_02] 29.99 29.09 36.17 27.77 31.08 31.79 31.20 48.47 58.16 53.12 97.26 95.88 96.41 96.00 97.72 95.36 96.29 96.34 95.86 96.40 95.56 96.05 96.16 96.40 91. 51 98.05 98.92 95.69 96.15 94.30 2554.87 2582.46 2616.52 2642.57 2671.59 2701.11 2729.90 2774.23 2826.74 2873.62 2956.46 3034.35 3108.85 3179.99 3249.73 3316.92 3385.00 3453.17 3521.10 3589.47 3657.83 3727.11 3796.57 3866.33 3932.51 4003.60 4075.03 4143.24 4212.03 4280.08 93.55 102.75 114.90 124.49 135.60 147.38 159.40 178.99 203.99 228.94 279.76 335.09 395.29 459.12 527.46 595.12 663.21 731.27 798.89 866.84 933.61 1000.14 1066.64 1133.16 1196.35 1263.88 1332.31 1399.41 1466.58 1531.85 -45.73 -50.08 -55.96 -60.62 -66.01 -71.78 -77.91 -88.47 -102.30 -116.18 -146.27 -182.53 -224.11 -265.90 -305.47 -342.20 -379.73 -417.86 -455.34 -492.71 -529.21 -565.15 -600.55 -635.48 -668.99 -81.80 -89.94 -100.60 -109.00 -118.74 -129.03 -139.38 -155.88 -176.72 -197.46 -238.53 -281.02 -325.89 -374.94 -430.75 -487.57 -544.39 -600.78 -657.08 -713.85 -769.76 -825.75 -882.04 -938.66 -992.25 -705.30 -1049.18 -742.64 -1106.52 -779.52 -1162.59 -816.56 -1218.63 -852.86 -1272.89 93.71 102.94 115.12 124.72 135.85 147.66 159.68 179.24 204.19 229.10 279.81 335.10 395.51 459.65 528.07 595.67 663.75 731.81 799.44 867.38 934.13 1000.63 1067.08 1133.54 1196.70 1264.21 1332.63 1399.74 1466.91 1532.19 240.79 240.89 240.91 240.92 240.93 240.91 240.80 240.42 239.93 239.53 238.48 237.00 235.48 234.66 234.66 234.94 235.10 235.18 235.28 235.39 235.49 235.61 235.75 235.90 236.01 236.09 236.13 236.16 236.18 236.18 DLS (deg/ 100f) 6.06 6.54 1. 47 2.17 2.96 2.40 4.09 3.12 3.44 5.87 4.72 5.03 3.48 4.34 4.28 0.86 0.96 0.57 0.79 0.53 0.81 0.43 0.71 0.46 0.82 0.85 1. 44 0.32 0.78 0.39 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_IFR_AK MWD_Inc_Only . MWD_Inc_Only MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 Page 4 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seg Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 61 62 63 64 65 4928.03 5023.20 5119.83 5216.82 5313.24 66 67 68 69 70 5409.71 5505.37 5602.48 5697.64 5793.44 71 72 73 74 75 5889.06 5985.53 5986.00 5998.00 6018.00 76 77 78 79 80 6030.60 6062.70 6095.09 6127.29 6159.01 81 82 83 84 85 6190.06 6223.38 6255.40 6286.40 6318.97 86 87 88 89 90 6351.27 6383.58 6412.88 6444.10 6475.29 44.71 44.27 43.93 44.04 44.17 43.74 45.59 48.31 51.38 54.39 57.95 61. 01 61. 03 62.87 64.64 65.79 68.58 71. 86 75.13 78 .46 82.53 85.48 87.88 91.35 95.16 97.51 98.93 98.90 101. 02 102.53 235.59 235.98 235.90 234.58 235.63 235.73 235.49 234.89 233.90 235.09 233.06 230.89 230.88 230.25 230.75 231.08 231.90 232.70 233.47 234.20 234.90 235.64 239.04 238.00 237.00 237.39 236.29 234.95 232.34 230.73 [(c)2005 IDEAL ID8_1C_02] 96.06 95.17 96.63 96.99 96.42 96.47 95.66 97.11 95.16 95.80 95.62 96.47 0.47 12.00 20.00 12.60 32.10 32.39 32.20 31.72 31.05 33.32 32.02 31.00 32.57 32.30 32.31 29.30 31. 22 31.19 4348.98 4416.87 4486.27 4556.05 4625.29 4694.74 4762.77 4829.06 4890.42 4948.22 5001.45 5050.44 5050.66 5056.31 5065.15 5070.43 5082.88 5093.84 5102.99 5110.23 5115.36 5118.84 5120.69 5120.90 5119.05 5115.49 5110.87 5106.33 5100.93 5094.56 1598.75 1665.42 1732.64 1799.95 1867.00 1933.93 2001.14 2072.04 2144.66 2220.95 2300.22 2382.94 2383.34 2393.86 2411.67 -890.42 -927.92 -965.58 -1003.98 -1042.37 -1080.12 -1118.10 -1158.62 -1200.97 -1245.31 -1291.93 -1343.13 -1343.39 -1350.12 -1361.53 -1328.29 -1383.44 -1439.15 -1494.49 -1549.53 -1604.83 -1660.32 -1718.57 -1777.69 -1839.88 -1904.17 -1969.60 -1969.92 -1978.10 -1991.94 2423.03 -1368.74 -2000.82 2452.46 -1387.16 -2023.97 2482.81 -1405.79 -2048.08 2513.60 -1424.33 -2072.77 2544.41 -1442.55 -2097.69 2574.99 -1460.31 -2122.64 2608.10 -1479.19 -2149.87 2640.06 -1496.43 -2176.77 2671.05 -1512.62 -2203.21 2703.56 -1530.08 -2230.63 2735.66 -1547.48 -2257.61 2767.64 -1564.97 -2284.38 2796.57 -1581.31 -2308.27 2827.25 -1599.53 -2333.03 2857.62 -1618.53 -2356.94 1599.13 1665.82 1733.06 1800.41 1867.50 1934.46 2001. 70 2072.65 2145.34 2221.70 2301.07 2383.97 2384.38 2394.93 2412.80 2424.20 2453.71 2484.13 2514.97 2545.84 2576.45 2609.58 2641. 53 2672.48 2704.97 2737.06 2769.02 2797.97 2828.70 2859.15 236.16 236.15 236.14 236.11 236.07 236.06 236.04 236.01 235.96 235.91 235.84 235.71 235.71 235.69 235.65 235.62 235.57 235.53 235.50 235.48 235.47 235.47 235.49 235.53 235.55 235.57 235.59 235.59 235.57 235.52 DLS (degl 100f) 1. 20 0.54 0.36 0.95 0.77 0.45 1.94 2.84 3.32 3.29 4.12 3.72 4_64 16.02 9.13 9.43 9.00 10.39 10_41 10.73 13.29 9.12 12.98 11. 69 12.09 7.37 5.54 4.52 10.67 7.00 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS BP_BLIND_TOW BP_BLIND_BOW BP_BLIND_Rat Hole BP_BLIND_IAB_Inc BP_BLIND_IAB_Inc BP_BLIND_IAB_Inc BP_BLIND_IAB_Inc BP_BLIND_IAB_Inc BP_BLIND_IAB_Inc 4IÞ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Page 5 of 10 Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 91 92 93 94 95 6506.77 6539.29 6570.44 6603.19 6634.08 96 97 98 99 100 6666.97 6698.95 6730.26 6762.91 6794.38 101 102 103 104 105 6826.92 6858.92 6891.33 6922.88 6955.16 106 107 108 109 110 6987.42 7018.49 7049.51 7083.30 7115.23 111 112 113 114 115 7145.60 7178.37 7211.12 7242.53 7275.05 116 117 118 119 120 7306.26 7339.21 7370.55 7402.53 7434.94 102.28 102.17 100.46 96.95 93.54 91. 76 92.10 91. 76 92.58 92.89 93.65 93.61 93.41 94.54 94.99 93.17 92.38 92.69 92.79 92.24 90.45 90.45 91.83 91. 62 91.11 91.17 92.62 92.13 91. 79 91.14 227.24 224.73 223.89 224.02 224.09 222.39 219.09 215.60 212.20 209.60 208.96 207.08 208.34 206.99 203.45 200.50 199.46 198.50 199.95 197.89 197.04 197_16 197.29 197.52 198.27 197.63 197.30 197.80 198.24 197.96 [(c)2005 IDEAL ID8_1C_02] 31. 48 32.52 31.15 32.75 30.89 32.89 31.98 31.31 32_65 31.47 32.54 32.00 32.41 31. 55 32.28 32.26 31. 07 31.02 33.79 31.93 30.37 32.77 32.75 31. 41 32.52 31.21 32.95 31. 34 31.98 32.41 5087.80 5080.91 5074.80 5069.84 5067.02 5065.50 5064.42 5063.37 5062.13 5060.63 5058.77 5056.74 5054_76 5052.57 5049.89 5047.60 5046.09 5044.72 5043.10 5041.70 5040.99 5040.73 5040.08 5039.14 5038.36 5037.74 5036.65 5035.35 5034.26 5033.43 2888.03 -1638.70 -2380.13 2919.18 -1660.78 -2402.98 2948.93 -1682.64 -2424.32 2980.41 -1705.94 -2446.78 3010.34 -1728.04 -2468.17 3042.19 -1751.97 -2490.68 3072.81 -1776.19 -2511.53 3102.20 -1801.06 -2530.51 3132.11 -1828.14 -2548.71 3160.24 -1855.11 -2564.85 3188.89 -1883.44 -2580.74 3216.72 -1911.63 -2595.74 3244.82 -1940.27 -2610.78 3272.15 -1968.15 -2625.39 3299.37 -1997.25 -2639.10 3325.59 -2027.08 -2651.14 3350.24 -2056.25 -2661.74 3374.52 -2085.55 -2671.82 3401.05 -2117.42 -2682.93 3426.02 -2147.59 -2693.28 3449.30 -2176.55 -2702.39 3474.29 -2207.87 -2712.02 3499.31 -2239.15 -2721.72 3523.36 -2269.11 -2731.11 3548.44 -2300.04 -2741.10 3572.54 -2329.73 -2750.72 3597.79 -2361.14 -2760.60 3621.83 -2391.00 -2770.04 3646.53 -2421.39 -2779.93 3671.60 -2452.19 -2790.00 2889.70 2921.05 2951.03 2982.78 3012.97 3045.14 3076.14 3106.01 3136.56 3165.42 3194.93 3223.70 3252.82 3281.20 3309.66 3337.30 3363.48 3389.42 3417.84 3444.69 3469.91 3497.11 3524.42 3550.75 3578.24 3604.73 3632.62 3659.24 3686.62 3714.47 235.45 235.35 235.24 235.12 235.00 234.88 234.73 234.56 234.35 234.12 233.88 233.63 233.38 233.14 232.88 232.60 232.31 232.03 231.72 231.43 231.15 230.85 230.56 230.28 230.00 229.74 229.46 229.20 228.94 228.69 DLS (deg/ 100f) 10.86 7.55 6.09 10.72 11.04 7.48 10.37 11.19 10.70 8.31 3.05 5.86 3.93 5.57 11. 02 10.72 4.20 3.25 4.30 6.67 6.52 0.37 4.23 0.99 2.79 2.06 4.51 2.23 1. 74 2.18 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Page 6 of 10 Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 121 122 123 124 125 7467.15 7499.01 7530.39 7563.37 7595.14 126 127 128 129 130 7627.17 7659.32 7691.11 7723.25 7754.76 131 132 133 134 135 7786.82 7817.87 7851.72 7882.85 7914.40 136 137 138 139 140 7947.02 7978.59 8011.01 8042.99 8075.08 141 142 143 144 145 8105.69 8137.82 8170.02 8202.34 8234.10 146 147 148 149 150 8265.84 8298.57 8331. 02 8362.47 8392.11 91. 83 92.17 91. 93 91. 86 91. 55 91.38 91. 42 91. 31 92.72 92.96 92.96 92.79 93.37 94.03 93.10 91. 86 91. 76 91.62 91.89 92.21 92.03 92.17 92.58 93.34 93.16 92.75 92.68 91. 93 90.90 90.69 197.39 196.83 196.82 197.03 195.43 192.34 190.84 189.38 188.19 189.42 188.83 188.46 187.99 186.04 186.19 185.18 185.06 185.13 186.02 184.77 185.61 184.80 183.92 184.85 184.86 184.58 185.47 185.31 185.74 185.60 [(c)2005 IDEAL ID8_1C_02] 32.21 31.86 31.38 32.98 31. 77 32.03 32.15 31. 79 32.14 31.51 32.06 31. 05 33.85 31.13 31.55 32.62 31. 57 32.42 31. 98 32.09 30.61 32.13 32.20 32.32 31.76 31. 74 32.73 32.45 31. 45 29.64 5032.59 5031.48 5030.36 5029.27 5028.32 5027.50 5026.72 5025.96 5024.83 5023.27 5021.61 5020.06 5018.24 5016.23 5014.27 5012.86 5011.86 5010.90 5009.92 5008.77 5007.64 5006.47 5005.13 5003.46 5001.66 5000.02 4998.47 4997.17 4996.39 4995.98 3696.37 -2482.87 -2799.77 3720.66 -2513.30 -2809.14 3744.48 -2543.31 -2818.22 3769.55 -2574.85 -2827.81 3793.45 -2605.34 -2836.69 3816.67 -2636.42 -2844.37 3839.07 -2667.90 -2850.83 3860.63 -2699.19 -2856.41 3881.86 -2730.93 -2861.31 3902.68 -2762.03 -2866.13 3923.99 -2793.64 -2871.21 3944.43 -2824.30 -2875.87 3966.53 -2857.75 -2880.70 3986.34 -2888.59 -2884.50 4006.03 -2919.89 -2887.85 4026.22 -2952.32 -2891.08 4045.53 -2983.75 -2893.90 4065.34 -3016.03 -2896.77 4085.10 -3047.84 -2899.88 4104.84 -3079.77 -2902.89 4123.58 -3110.23 -2905.66 4143.27 -3142.21 -2908.57 4162.61 -3174.29 -2911.02 4182.03 -3206.47 -2913.49 4201.31 -3238.06 -2916.17 4220.53 -3269.65 -2918.78 4240.49 -3302.22 -2921.64 4260.44 -3334.50 -2924.69 4279.85 -3365.79 -2927.72 4298.21 -3395.29 -2930.64 3742.10 3769.34 3796.15 3824.44 3851. 57 3878.29 3904.47 3929.97 3955.39 3980.39 4006.03 4030.79 4057.73 4082.19 4106.76 4132.14 4156.61 4181. 83 4206.98 4232_23 4256.34 4281.74 4306.99 4332.42 4357.65 4382.91 4409.16 4435.39 4460.95 4485.16 228.43 228.18 227.94 227.68 227.43 227.17 226.90 226.62 226.34 226.06 225.78 225.52 225.23 224.96 224.68 224.40 224.12 223.84 223.57 223.31 223.05 222.79 222.52 222.26 222.01 221.75 221.50 221.25 221. 02 220.80 DLS (deg/ 100f) 2.78 2.06 0.77 0.67 5.13 9.66 4.67 4.60 5.74 3.97 1. 84 1. 31 2.20 6_60 2.99 4.90 0.49 0.48 2.91 4.02 2.80 2.56 3.01 3.71 0.57 1. 56 2.72 2.36 3.55 0.85 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Page 7 of 10 Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 151 152 153 154 155 8426.07 8457.74 8489.94 8522.27 8553.98 156 157 158 159 160 8585.92 8618.19 8650.24 8681.44 8714.76 161 162 163 164 165 8746.52 8777.94 8810.51 8842.28 8874.56 166 167 168 169 170 8906.71 8938.36 8970.53 9002.92 9034.75 171 172 173 174 175 9067.16 9098.87 9130.46 9162.47 9194.37 176 177 178 179 180 9226.50 9259.04 9290.23 9320.60 9351.69 90.18 90.56 91.38 91.38 91.14 90.80 90.93 90.97 90.11 89.32 89.22 89.05 89.08 87.68 86.54 86.16 85.96 85.92 86.16 86.95 86.61 87.37 88.91 88.57 88.98 89.22 88.98 91.14 91.35 91. 00 186.03 184.20 182.83 184.76 183.57 182.59 182.86 181.85 182.73 184.61 185.21 182.79 183.36 183.15 187.77 186.84 185.42 186.33 186.38 187.90 188.44 188.49 188.29 189.25 188.00 186.95 184.01 183.53 182.37 181. 44 [(c)2005 IDEAL ID8_1C_02] 33.96 31.67 32.20 32.33 31. 71 31. 94 32_27 32.05 31. 20 33.32 31.76 31. 42 32.57 31.77 32.28 32.15 31.65 32.17 32.39 31.83 32.41 31. 71 31. 59 32.01 31. 90 32.13 32.54 31. 19 30.37 31. 09 4995.72 4995.52 4994.97 4994.20 4993.50 4992.96 4992.47 4991. 94 4991.65 4991.81 4992.22 4992.69 4993.22 4994.12 4995.75 4997.79 4999.97 5002.25 5004.48 5006.40 5008.22 5009.88 5010.91 5011.61 5012.29 5012.80 5013.31 5013.28 5012.62 5011.98 4319.31 -3429.07 -2934.08 4338.68 -3460.61 -2936.91 4357.66 -3492.75 -2938.88 4376.83 -3524.99 -2941.02 4395.81 -3556.61 -2943.32 4414.44 -3588.50 -2945.04 4433.09 -3620.73 -2946.57 4451.45 -3652.75 -2947.89 4469.30 -3683.92 -2949.14 4489.01 -3717.17 -2951.27 4508.34 -3748.81 -2953.99 4527.08 -3780.15 -2956.18 4546.07 -3812.67 -2957.92 4564.67 -3844.37 -2959.73 4584.54 -3876.46 -2962.79 4605.12 -3908.28 -2966.87 4624.87 -3939.68 -2970.25 4644.84 -3971.60 -2973.53 4665.15 -4003.71 -2977.11 4685.47 -4035.24 -2981.06 4706.60 -4067.27 -2985.65 4727.40 -4098.59 -2990.32 4748.11 -4129.82 -2994.92 4769.26 -4161.45 -2999.80 4790.27 -4192.98 -3004.58 4810.96 -4224.83 -3008.76 4831.02 -4257.22 -3011.87 4849.52 -4288.34 -3013.92 4867.17 -4318.66 -3015.48 4884.78 -4349.73 -3016.52 4513.02 4538.86 4564.68 4590.77 4616.56 4642.26 4668.19 4693.89 4718.97 4746.30 4772.80 4798.81 4825.53 4851.72 4879.04 4906.83 4933.90 4961.40 4989.27 5016.95 5045.47 5073.50 5101.47 5129.96 5158.35 5186.70 5214.91 5241.52 5267.25 5293.34 220.55 220.32 220.08 219.84 219.61 219.38 219.14 218.90 218.68 218.45 218.24 218.03 217.80 217.59 217.39 217 .20 217 . 01 216.82 216.63 216.46 216.28 216.11 215.95 215.79 215.62 215.46 215.28 215.10 214.92 214.74 DLS (deg/ 100f) 1. 96 5.90 4.96 5.97 3.83 3.25 0.93 3.15 3.94 6.12 1. 92 7.72 1. 75 4.46 14.72 3.12 4.52 2.82 0.76 5.37 1.97 2.40 4.92 3.18 4.12 3.35 9.06 7.09 3.88 3.20 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 Page 8 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) --- -------- -------- 181 182 183 184 185 9382.10 9413.59 9443.16 9475.32 9505.66 186 187 188 189 190 9536.25 9566.58 9597.05 9625.82 9658.47 191 192 193 194 195 9689.03 9719.80 9752.02 9781.86 9812.78 196 197 198 199 200 9843.42 9873.85 9905.24 9935.12 9965.48 201 202 203 204 205 9996.49 10030.36 10060.46 10091.84 10125.50 206 207 208 209 210 10157.44 10189.39 10221.64 10253.50 10285.28 Incl angle (deg) ------ ------ 90.69 89.77 88.81 89.84 89.22 88.98 89.70 89.87 89.12 88.64 88.71 88.36 88.67 89.39 89.53 89.12 89.25 89.49 89.49 88.81 88.29 90.04 89.91 89.60 89.91 90.18 90.83 90.63 90.45 89.60 Azimuth angle (deg) ------- ------- 180.66 180.73 179.83 180.13 180.98 181.64 181. 27 181. 84 180.99 181.04 179.83 180.16 178 . 89 179.35 178.66 179.70 178.42 179.61 179.77 179.33 180_37 179.96 178.89 180.13 183.00 181.47 178.58 179.42 179.24 179.73 [(c)2005 IDEAL ID8_1C_02] Course length (ft) ------ ------ 30.41 31. 49 29.57 32.16 30.34 30.59 30.33 30.47 28.77 32.65 30.56 30.77 32.22 29.84 30.92 30.64 30.43 31.39 29.88 30.36 31. 01 33.87 30.10 31.38 33.66 31.94 31.95 32.25 31. 86 31.78 TVD depth (ft) -------- -------- 5011.53 5011.40 5011.77 5012.15 5012.40 5012.88 5013 .23 5013.34 5013.60 5014.23 5014.94 5015.73 5016.56 5017.07 5017.36 5017.72 5018.15 5018.50 5018.76 5019.21 5020.00 5020.49 5020.51 5020.64 5020.78 5020.76 5020.48 5020.07 5019.77 5019.75 Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) -------- ---------------- -------- ---------------- 4901.63 -4380.13 -3017.07 4918.91 -4411.61 -3017.46 4934.96 -4441.18 -3017.60 4952.28 -4473.34 -3017.59 4968.87 -4503.67 -3017.88 4985.94 -4534.25 -3018.58 5002.92 -4564.57 -3019.35 5020.03 -4595.03 -3020.18 5036.12 -4623.79 -3020.89 5054.19 -4656.43 -3021.47 5070.85 -4686.98 -3021.70 5087.42 -4717.74 -3021.70 5104.54 -4749.94 -3021.43 5120.23 -4779.78 -3020.97 5136.43 -4810.69 -3020.44 5152.57 -4841.32 -3020.00 5168.54 -4871.75 -3019.50 5184.99 -4903.13 -3018.96 5200.95 -4933.01 -3018.80 5217.11 -4963.36 -3018.56 5233.74 -4994.36 -3018.48 5252.07 -5028.23 -3018.57 5268.03 -5058.33 -3018.27 5284.71 -5089.70 -3018.00 5303.61 -5123.35 -3018.92 5321.85 -5155.26 -3020.17 5339.08 -5187.21 -3020.18 5355.97 -5219.45 -3019.62 5372.82 -5251.31 -3019.25 5389.70 -5283.08 -3018.96 Total displ (ft) At Azim (deg) --------------- --------------- 5318.67 5344.85 5369.36 5395.98 5421. 32 5447.14 5472.82 5498.71 5523.15 5550.82 5576.60 5602.47 5629.48 5654.43 5680.30 5706.03 5731.60 5758.02 5783.40 5809.19 5835.65 5864.71 5890.38 5917.21 5946.64 5974.79 6002.38 6029.99 6057.40 6084.83 214.56 214.37 214.19 214.00 213.83 213.65 213.48 213.32 213 .16 212.98 212.81 212.64 212.46 212.29 212.12 211. 96 211.79 211.62 211.46 211.31 211.15 210.98 210.82 210.67 210.51 210.36 210.21 210.05 209.90 209.75 DLS (deg/ 100f) 2.76 2.93 4.45 3.34 3.47 2.30 2.67 1.95 3.94 1. 48 3.96 1. 56 4.06 2.86 2.28 3.65 4.23 3.87 0.54 2.67 3.75 5.31 3.58 4.07 8.58 4.86 9.27 2.68 0.80 3.09 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 Page 9 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) DLS (deg/ 100f) ------ ------ Srvy Tool tool Carr type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- 211 212 213 214 215 10317.76 10349.79 10382.06 10413 .94 10445.71 216 217 218 219 220 10478.05 10509.70 10541.40 10573.64 10606.07 221 222 223 224 225 10638.53 10669.63 10702.49 10734.65 10765.02 226 227 228 229 230 10797.46 10829.78 10861.91 10894.01 10925.48 231 232 233 234 235 10957.21 10989.97 11019.59 11051.23 11083.64 236 237 238 239 240 11116.05 11147.47 11179.62 11211.74 11243.62 91. 52 92.13 93.00 93.72 93.27 92.27 93.03 93.44 92.00 90.35 90.73 90.15 89.01 89.77 89.36 89.63 90.49 90.39 90.28 89.12 89.49 89.32 89.08 89.39 89.05 89.15 88.94 89.36 89.53 90.73 178.84 177.80 177.66 177.58 175.93 176.21 175.99 172.58 172.24 168.91 168.04 165.44 165.78 162_17 161.08 157.51 154.82 153.38 151. 27 149.56 148.70 146.52 144.67 141.88 140.71 141.09 141.81 142.04 140.06 140.52 [(c)2005 IDEAL ID8_1C_02] 32.48 32.03 32.27 31. 88 31. 77 32.34 31.65 31.70 32.24 32.43 32.46 31.10 32.86 32.16 30.37 32.44 32.32 32.13 32.10 31.47 31.73 32.76 29.62 31.64 32.41 32.41 31. 42 32.15 32.12 31.88 5019.44 5018.42 5016.97 5015.10 5013.17 5011.60 5010.14 5008.35 5006.82 5006.15 5005.85 5005.61 5005.85 5006.19 5006.42 5006.71 5006.68 5006.43 5006.24 5006.41 5006.79 5007.13 5007.54 5007.97 5008.41 5008.92 5009.44 5009.92 5010.23 5010.16 5406.86 -5315.56 -3018.56 5423.31 -5347.56 -3017.62 5439.59 -5379.77 -3016.34 5455.61 -5411.57 -3015.02 5471.15 -5443.23 -3013.22 5486.65 -5475.45 -3011.01 5501.83 -5506.99 -3008.86 5516.14 -5538.48 -3005.71 5529.75 -5570.40 -3001.46 5542.51 -5602.38 -2996.15 5554.18 -5634.19 -2989.66 5564.48 -5664.45 -2982.53 5574.75 -5696_28 -2974.36 5583.92 -5727.18 -2965.49 5591.38 -5756.00 -2955.91 5598.07 -5786.34 -2944.45 5602.99 -5815.90 -2931.39 5606.74 -5844.80 -2917.35 5609.50 -5873.23 -2902.45 5611.15 -5900.59 -2886.91 5612.11 -5927.83 -2870.63 5612.23 -5955.49 -2853.08 5611.30 -5979.92 -2836.35 5609.02 -6005.28 -2817.43 5605.58 -6030.57 -2797.17 5601.91 -6055.71 -2776.73 5598.65 -6080.28 -2757.15 5595.58 -6105.59 -2737.33 5592.03 -6130.57 -2717.14 5588.09 -6155.09 -2696.77 6112.84 6140.23 6167.68 6194.79 6221. 59 6248.74 6275.37 6301.51 6327.57 6353.23 6378.25 6401.68 6426.08 6449.40 6470.63 6492.42 6512.89 6532.43 6551.26 6568.96 6586.32 6603.63 6618.49 6633.35 6647.70 6661.98 6676.21 6691.13 6705.72 6719.95 209.59 209.44 209.28 209.12 208.97 208.81 208.65 208.49 208.32 208.14 207.95 207.77 207.57 207.37 207.18 206.97 206.75 206.53 206.30 206.07 205.84 205.60 205.38 205.13 204.88 204.63 204.39 204.15 203.90 203.66 6.52 3.76 2.73 2.27 5.37 3.21 2.50 10.82 4.59 11. 46 2.92 8.57 3.62 11.47 3.83 11. 04 8.74 4.49 6.58 6.57 2.95 6.67 6.30 8.87 3.76 1. 21 2.39 1. 49 6.19 4.03 ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD~IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS SCHLUMBERGER Survey Report 8-Feb-2005 18:32:02 Page 10 of 10 ---~---- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 241 242 243 244 245 11275.24 11307.10 11339.34 11371.68 11403.79 246 247 248 249 250 11436.18 11467.84 11499.81 11532.04 11565.07 251 252 253 254 255 11596.70 11628.70 11660.96 11692.22 11724.49 256 257 258 259 260 11755.64 11787.14 11819.48 11852.10 11883.63 261 262 263 264 265 11915.13 11947.79 11979.40 11997.05 12054.00 90.32 89.84 89.43 89.22 89.56 89.49 89.67 89.84 89.01 89.18 88.81 88.33 89.97 88.84 89.12 89.05 89.63 90.49 90.21 89.19 90.21 91.18 90.18 90.01 88.97 141.67 140.09 139.15 136.38 134.96 137.69 136.40 136.71 134.77 132.75 127.50 127.50 129.75 126.53 127_73 126.39 126.40 127.32 127.87 13 0.64 133.62 134.07 137.23 137.90 137.90 [(c)2005 IDEAL ID8_1C_02] 31.62 31.86 32.24 32.34 32.11 32.39 31. 66 31.97 32.23 33.03 31.63 32.00 32.26 31. 26 32.27 31.15 31. 50 32.34 32.62 31. 53 31.50 32.66 31.61 17.65 56.95 5009.87 5009.82 5010.03 5010.41 5010.75 5011.02 5011.25 5011.39 5011.71 5012.23 5012.79 5013 .59 5014.07 5014.39 5014.97 5015.46 5015.83 5015.79 5015.59 5015.76 5015.92 5015.53 5015.15 5015.12 5015.63 5584.61 -6179.70 -2676.91 5581.00 -6204.41 -2656.81 5576.63 -6228.97 -2635.93 5571.22 -6252.91 -2614.19 5564.69 -6275.88 -2591.76 5558.47 -6299.30 -2569.39 5552.78 -6322.47 -2547.82 5546.77 -6345.68 -2525.84 5540.25 -6368.76 -2503.34 5532.47 -6391.60 -2479.49 5523.08 -6411.98 -2455.32 5512.19 -6431.45 -2429.94 5501.81 -6451.59 -2404.74 5491.50 -6470.89 -2380.16 5480.32 -6490.36 -2354.44 5469.50 -6509.13 -2329.58 5458.21 -6527.82 -2304.23 5446.86 -6547.22 -2278.35 5435.81 -6567.12 -2252.51 5425.99 -6587.07 -2228.10 5417.69 -6608.20 -2204.74 5410.04 -6630.82 -2181.19 5403.60 -6653.42 -2159.09 5400.59 -6666.45 -2147.19 5391.19 -6708.70 -2109.01 6734.58 6749.33 6763.74 6777.38 6789.98 6803.16 6816.53 6829.90 6843.09 6855.69 6866.01 6875.19 6885.18 6894.75 6904.22 6913 .45 6922.57 6932.32 6942.69 6953.70 6966.29 6980.35 6994.98 7003.71 7032.39 203.42 203.18 202.94 202.69 202.44 202.19 201.95 201.70 201.46 201.20 200.95 200.70 200.44 200.19 199.94 199.69 199.44 199.19 198.93 198.69 198.45 198.21 197.98 197.85 197.45 DLS (deg/ 100f) 3.86 5.18 3.18 8.59 4.55 8.43 4.11 1.11 6.55 6.14 16.64 1. 50 8.63 10.92 3.82 4.31 1. 84 3.89 1. 89 9.36 10.00 3.27 10.48 3.92 1. 83 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS . MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS Projected to TD lAB Inclination RIG- TREE: FMC 4-1/16" 5M A RA Tag 6347' DATE 10/1212004 !\IUK TRIOLO GL Compll'ltion hanger & packoff I I 109' · .. ~ ~ !Æ ~ E (ill F !Æ ~!Æ ~ ~ ~!Æ ;/ FRANK H. MURKOWSKI, GOVERNOR AI/ASIiA. OIL AND GAS CONSERVATION COMMISSION ! I 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay S-213AL3 BP Exploration (Alaska) Inc. Permit No: 204-217 Surface Location: 4347' NSL, 4501' WEL, SEC. 35, TI2N, RI2E, UM Bottomhole Location: 2757' NSL, 1269' WEL, SEe. 03, TIIN, RI2E, UM (OA) Dear Mr. Crane: Enclosed is the approved application for permit to redrill the above development well. The permit is for a new wellbore segment of existing well PRU S-213A, Permit No. 204-213, API 50-029-22993-01. Production should continue to be reported as a function of the original API number stated above. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659- (pager). w? ' Un tyorman Chairman BY ORDER OF THE COMM N DATED this-L day of 0lf,2qo4... / þtel4C ~ cc: Department ofFISh & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. I. STATE OF ALASKA . ALASKA O~ND GAS CONSERVATION COM~SION PERMIT TO DRILL 20 MC 25.005 1b. Current Well Class 0 Exploratory II Development dÌi C ia~~pW1fc)4e o Stratigraphic Test 0 Service 0 Development Gas I:r'širigle't"o'r\e 5. Bond: 1m Blanket 0 Single Well 11. Well Name an6NuthÞ~: [;1; Bond No. 2S100302630-277 PBUS.~1~~ 2.} ~ 6. Proposed Depth: 12. Field I Pool(s): .. MD 12128' TVD 5052' Prudhoe Bay Field I Polaris Pool 7. Property Designation: ADL 028253 o Drill II Redrill 1a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM Top of Productive Horizon: 2321' NSL, 1796' WEL, SEC. 34, T12N, R12E, UM (OA) Total Depth: r".,¿I ¢- 2757' NSL, 1269' WEL, SEC. 03~, R12E, UM (OA) 4b. Location of Well (State Base Plane Coordinates): Surface: x- 618930 y- 5980550 Zone- ASP4 16. Deviated Wells: Kickoff Depth: 5943 feet Maximum Hole Angle: 93 degrees S¡>eÇifications Grade Coupling Length L-80 IBT 6210' ~ 18. Casing Program: Size Casing 4-1/2" Hole 6-314" Weight 12.6# y.J("A- 10 (ìÞ /Z,Ocif: 8. Land Use Permit: 13. Approximate Spud Date: 11/01/04 14. Distance to Nearest Property: 9900' 9. Acres in Property: 2560 10. KB Elevation 15. Distance to Nearest Well Within Pool (Height above GL): 61.90' feet 500' away from S-01 at Top OA 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2312 Surface: 1807 SettíngDeþth Top '. . .. ......> .··.··Bottom MD TVD MD TVD (íncludinQ stage data) 5918' 5022' 12128' 5052' Uncemented Slotted Liner 19. PRESENT WELL CONDITION Sl,jMMARY (To be col11pletedfor RednIlANDRe;,.entryQperatíò('ls) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Effective Depth TVD (ft):1 12139 5082 None 12139 5082 MD 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Michael Triolo, 564-5774 ~;~~;r;~;: /Úc- :::ne Sen;~ ::~8:ng;neer -~t=~~750 Permit To Drill I API Number: Permit Approval ,1,1. / 1 See cover letter for Number: 2o~ - 2..) ? 50- 029-22993-63-00 Date: / 1¡IjÓ '1 other requirements Conditions of Approval: Samples Required 0 Yes ~o Mud Log Required 0 Yes gNo ____. Hy~rog,en Sulfide Measures [J Ye~NO Directional Survey Required ~Yes 0 No Other: \ f: s.t BoP£- ~çoo pçJ M~v.lli ~ Form 10-401 Revised 0 004 Structural _ Conductor 110' 20" Surface 2831' 9-5/8" Intermediate Production 6565' 7-5/8" Liner 5749' (oad) 4-1/2" Liner (AL 1, OBb) 5516' 4-1/2" Liner (AL2, OBc) 5832' 4-1/2" Liner (AL3, OBa) 6094' 4-1/2" Perforation Depth MD (ft): 20. Attachments 0 Filing Fee, $100 0 BOP Sketch o Property Plat 0 Diverter Sketch Junk (measured): None 260 sx Arctic Set (Approx.) 440 sx Arcticset Lite 3, 215 sx CI'G' 110' 2829' 110' 2859' 202 sx Class 'G' Uncemented Slotted Liner Uncemented Slotted Liner Uncemented Slotted Liner Uncemented Slotted Liner perfOration Depth TVD (ft): 1m Drilling Program 0 Time vs Depth Plot o Seabed Report 1m Drilling Fluid Program 6591' 6400' - 12149' 6634' - 12150' 6312' - 12144' 6045' -12139' 5227' 5198'- 5217' 5182' - 5122' 5177' - 5172' 5082' - 5082' o Shallow Hazard Analysis 1m 20 AAC 25.050 Requirements APPROVED BV THE COMMISSION Date II, I, /lJcI- ~~ I~ /UPlicate · Greater p.oe Bay S-213A ML Permit I Well Name: ···1 S;'2t3A, S-213A L 1, S-213A La~, .S';'2t3AL3J 213AL4 I Type of Well (producer or injector): I Schrader OBd, OBc, OBb, OBa and OA Multilateral Producer I Surface Location: S-213a OBd Target Start: S-213a OBd Target End: S-213a L 1 OBb Target Start: S-213a L 1 OBb Target End: S-213a L2 OBc Target Start: S-213a L2 OBc Target End: S-213a L3 OBa Target Start: S-213a L3 OBa Target End: S-213a L4 OA Target Start: S-213a L4 OA Target End: I AFE Number: I PLD5M1074 4,346' FSL, 4,500' FEL, Sec. 35, T12N, R11 E X = 618,929.96 V = 5,980,549.84 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E X = 616,389.90 V = 5,978,485.05 Z = 5,180' TVDss 2,757' FSL, 1,269' FEL, Sec. 3, T11 N, R 12E X - 61 V - Z - 5,155' TVDss 2,545' FSL, 1,607' FEL, Sec. 34, T12N, R12E X = 616,574.94 V = 5,978,712.43 Z = 5,120' TVDss 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E X = 61 V = 5,973,650.05 Z = TVDss 2,172' FSL, 1,873' FEL, Sec. 34, T12N, R12E X = 616,314.90 V = 5,978,335.05 Z = 5,105' TVDss 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E X = 616,999.90 V = Z = 10' TVDss 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E X = 616,389.90 V = 5,978,485.05 Z = 5,040' TVDss 2,757' FSL, 1,269' FEL, Sec. 3, T11N, R12E X = 61 V = 5,973,650.05 Z = TVDss 2,321' FSL, 1,796' FEL, Sec. 34, T12N, R12E X = 616,389.90 V = 5,978,485.05 Z = 5,000' TVDss 2,757' FSL,1,269' FEL, Sec. 3, T11N, R12E X = 616,999.90 V = 5,973,650.05 Z = 4,990' TVDss KBE = 61.90' I Rig: I Doyon 16 I Estimated Start Date: I Nov. 1512004 I Operating days to complete: I 50.68 OBd MD 12,149' Well TVDrkb: TD 5,217' Max Inc. 93° KOP 2,870' OBb MD 12,150' Well TVDrkb: TD 5,122' Max Inc. 99° KOP 6,337' OBc MD 12,144' Well TVDrkb: TD 5,172' Max Inc. 92° KOP 6,634' OBa MD 12,139' Well TVDrkb: TD 5,082' Max Inc. 93° KOP 6,070' OAMD 12,128' Well TVDrkb: TD 5,052' Max Inc. 93° KOP 5,943' Current Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Original Well API #: Sidetrack API #'s S-213a API OBd #: S-213a L 1 API OBb #: S-213a L2 API OBc #: S-213a L3 API OBa #: S-213a L4 API OA #. Well Type: Current Status: H2S: -9,900' to PBU Unit Boundary at Top OA(this is the closest point in the producing well section to any unit boundary) -500' to S-01 (Ivishak well) at Top OA 50-029-22993-00 50-029-22993-01 50-029-22993-60 50-029-22993-61 50-029-22993-62 50-029-22993-63 Schrader O-sand Penta-lateral Producer Planned pre-rig decompletion: Tubing cut at ±5,250' MD o ppm from produced fluids (approximated to be around 10 ppm due to contaminated gas lift gas) Draft Permit 10/21/04 I Greater pr.oe Bay S-213A ML Permit BHT: 84 of @ 4,400' TVDss ( stimated) BHP: Static taken on S-213 on 9-18-04 showed an 8.15 ppg EMW. MDT's taken on S-116 on 12/03 agreed with the recent static, but also showed higher pressures at the mid/toe of the planned S-213A trajectory Sand HeaIPsi·(ppg) TVDl"kb TDPsi(ppg) OA 2,141(8.15) 5,052 2,338 (8.9) OBa 2,160 (8.15) 5,097 2,352 (8.9) OBb 2,175 (8.15) 5,132 2,370 (8.9) OBc 2,194 (8.15) 5,177 2,394 (8.9) OBd 2,215 (8.15) 5,227 2,414 (8.9) Cement: TO / PBTD: Is this well frac'd? Mechanical Condition S-213 Wellhead: Base Flange height: Nabor 9ES: Doyon 16: Tubing: Casing Casing Head: Casing Hanger: Tubing Spool: Tubing Head Adapter: Tbg. Hanger: Tree: Open Perfs: Tubing / Casing Fluids: Materials Needed TVDrkb 5,052 5,082 5,122 5,172 5,217 Comments Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Top of cement on 9-%" casing is at surface. Top of cement on 7" casing is at 3,000' MD based on bond log run on 1/9/01 5,314' MD TOF inside 3-Y2" tubing. Yes FMC 11" Gen 5 with 7" mandrel hanger Above MSL = 35.90' KB / MSL = 64.40' KB / MSL = 61.90' 3-~", 9.3#, L-80, NSCT with tubing cut @ -5,260' MD. -Cut correlated to GLM @ 5,227 Surface: 9-%", 40#, L-80, BTC to 2,859' MD Production: 7", 26#, L-80, BTC from surface to 6,507' MD FMC 11", 5M 7" FMC Mandrel Hanger and packott with 8.000-4 ACME-2G-LH external R&R thread top FMC 11" X 11" 5M FMC 11" X 4-1/16", 5M FMC 11" x 4-~" with 4-Y2" NSCT pup joint 7.11500 EN, CIW BPVT Cameron 5M,4-1/16" Currently from 5,892- MD to 6,165' MD (planned to be abandoned with drilling rig) SW with diesel cap down to -2,000' TVD 6,600' 1 each 40 each 2 lots 3 each 7-%" 29.7# L-80 STL-FJ Casing (Burst: 6,890; Collapse: 4,790) 7-%" STL-FJ Float Shoe and Float Collar 7-%" x 8-~" In-line Centralizers 7-%" casing pups 5',10',20' (Verify with Unique on stock) 7-%" RA Tag 5 x Production liners: 29,210' 730 each 4 each 5 each 1 each 1 each 3 assemblies 4 ~", 12.6#, L-BO, IBT-Mod Slotted liner 4 ~" x 5 %" x 8" Straight Blade Centralizers 7-%" x 4-~" Baker ZXP Liner Top Packer 4-~" Halliburton Float Shoes 6" x 3" x 10' Aluminum KO billet 6.4" x 15' EWS Swell Packer Baker Level 3 Hookwall Hangers with LEM 2 Draft Permit 10/21/04 Greater Bay S-213A ML Permit 5,900' 1 each 3 each 1 each 4 each 1 each 5,900' 1 each 4-Y2", 12.6 Ib/tt, L-80, BTC-M tubing Baker PRM Production Packer 7-%" X 4-'W Halliburton X-Nipple (3.813" ID) 4-*" Baker CMD Sliding Sleeve Camco 4-%" X 1" KBG-2 Gas Litt Mandrels Phoenix pressure gauge I-wire for the Phoenix gauge 4-Y2" WLEG (Unique Machine) Surface and Anti-Collision Issues Surface Shut-in Wells: S-112i and S-120 will need to be shut-in for the rig move on and off S-213A. Close Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile. CIOS~~h Well List: r--~øa~'I!"~"""'~~:-I"-»;~~:~"1~~~''''~-~ Mud Program 8-%" Intermediate Hole Mud Properties: I Freshwater Mud (LSND) PH: 9.0 - 9.5 · Interval/ Density (ppg) Funnel vis I YP I Tauo I PV I API Filtrate I MBT 9.0 - 9.3 45 - 60 22 - 30 3 - 6 12 -18 4 - 6 < 20 Maintain proper fluid rheology & lubricant concentration to achieve the directional requirements Optimize mud rheology to maximize ROP while following ECD guidelines Reduce shaker blindin while drillin the UGNU BDF 263 . 6-%" Production Hole Mud Properties: I LVT-200 MOBM (Versa-Pro) Interval/ Density (ppg) Stability I YP I Oil: H20 Ratio I PV I API Filtrate I MBT 9.2 650 - 900 16 - 19 80 : 20 < 20 < 5 < 6 Minimize solids/liquid invasion by maintaining optimum PSD of bridging agents. Maintain minimal ECD's by reducing drill solids accumulation through utilization of the rigs solids control system and effective dilution. Interval Specific Objectives: Interval Specific Objectives: Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOPE and drilling fluid system schematics are on file with the AOGCC. Production Section- · Maximum anticipated BHP: · Maximum surface pressure: 2,312 psi @ 5,052' TVDss (8.8 ppg EMW). Based on S-116 MDT's 1,807 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psVtt) · Planned BOP test pressure: · Test Frequency: · Planned completion fluid: 3,500 psi (7-%" casing will be tested to 3,500 psi) 7 day test cycle (Pre drilling phase) /14 day test cycle (Drilling phase) Estimated 9.3 ppg Brine / 6.8 ppg Diesel riM....... j~'y.~n¡I.~..i_11111illi.··DrrUIIIIIIII~""L. .:1._ ..Y j. w,"" ...1. .... .' ..' y. "..JR..B .. ... 5,000 psi Working Pressure 3,500/250 psi Rams & Valves (entire stack and valves 2,500/250 psi Annular 3 Draft Permit 10/21/04 . Greater p.oe Bay S-213A ML Permit Disposal · NO ANNULAR INJECTION ON THIS WELL. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. Formation Markers 1m 11' ~'m~m~_¡~~~~iI'jll_.~"'.,IWJ"ßI_~,r!;)~:~lIIIIr-,,: il-' w~_'.[!} SV6 1,561 N/A 718 8.8 Above KOP Base Permafrost 1,901 N/A 874 8.8 Above KOP SV5 2,137 N/A 983 8.8 Above KOP SV4 2,315 N/A 1,065 8.8 Above KOP SV3 2,681 N/A 1,233 8.8 No SV2 2,826 2,926 1,270 8.6 No SVl 3,153 3,340 1,427 8.7 Pass. Free Gas btw 3,150 & 3,190' UG4 3,484 3,802 1,585 8.7 No UG4A 3,510 3,839 1,598 8.8 Heavy Oil throughout UG3 3,855 4,320 1,763 8.8 Thin coals UGl 4,410 5,094 2,028 8.8 Heavy Oil throughout Ma 4,654 5,435 2,145 8.9 Yes Mbl 4,705 5,507 2,169 8.9 Yes Mb2 4,750 5,570 2,191 8.9 Oil & Water owe -4766'SS Mc 4,825 5,683 2,227 8.9 Yes Na 4,890 5,790 2,258 8.9 Yes Nb 4,905 5,816 2,265 8.9 Yes Nc 4,942 5,884 2,283 8.9 Yes OA 4,990 5,979 2,306 8.9 Yes OBa 5,035 6,080 2,327 8.9 Yes OBb 5,070 6,170 2,344 8.9 Yes OBc 5,1I5 6,312 2,365 8.9 Yes OBd 5,165 6,591 2,389 8.9 Yes T.D. 5,155 12,149 Yes CasinglTubing Program 8-3,4" 7-%" 29.7# L-BO STL-FJ 6,565' 26' I 26' 6,591' I 5,227' 6-3,4" OBd 4- W' slotted 12.6# L-BO IBT 5,749' 6,400' I 5,198' 12,149' 15,217' 6-3,4" OBb 4-%" slotted 12.6# L-BO IBT 5,516' 6,634' 15,182' 12,150' 15,122' 6-3,4" OBc 4-%" slotted 12.6# L-80 IBT 5,B32' 6,312' 15,177' 12,144' / 5,172' 6-3,4" OBa 4-%" slotted 12.6# L-80 IBT 6,094' 6,045' /5,082' 12,139' / 5,082' 6-3,4" OA 4-%" slotted 12.6# L-BO IBT 6,210' 5,918' / 5,022' 12,12B' / 5,052' Tubing 4-%" 12.6# L-BO IBT-M 5,B44' 26' / 26' 5,B70' / 5,000' Cement Calculations Casing Size 19-% -in 40-lb/ft L-80 BTC surface casing Cement KO Plug Basis 200% excess in open hole 50% excess in annulus. Top of KO plug 2,300' MD Total Cement Vol: Wash None Spacer None Lead None Tail 70-bbl,423-sx AS1 - 0.93 ft;j/sx of tail at Temp BHST == 50°F from SOA, BHCT 65°F estimated by Dowell 4 Draft Permit 10/21/04 · Greater preoe Bay S-213A ML Permit Casing Size 17-% -in 29.7-lb/ft L-80 STL-FJ intermediate casing Basis Top of tail cement 500-ft MD above top of Schrader Ma-sand. 30% excess over gauge. Total Cement Vol: Wash 20-bbl Water Spacer 30-bbI10.7-lb/gal MudPush Spacer Tail 43 bbl, 202-sx 15.8-lb/gal Premium - 1.20 ft"/sx with D600G - 2gal/sk; 0047- 0.2gal/sk; 0174 - 3% BWOC; B153 - 0.15gal/sk of tail at Ma: MD Temp BHST :::: 85°F from SOR, BHCT 90°F estimated by Dowell 7-0/." Casing Space Out a) Space 7-%" casing out with pups and long/short joints as required to place the top of a long full joint - 5- 15' above the top of the OBc, OBa and OA sands to allow for the window to be milled just below the top of each sand and in the middle of a full joint of casing. These KOP's may be altered to enhance reservoir contact depending on the angle of intersection of each zone. b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth except on the OBd lateral. It will need to be placed 120' above the casing shoe. c) Emergency 7-%" casing slips can be used instead of the 7-%" mandrel hanger if required for space out. 7-%" String Centralizer Placement a) Centralizer size: 7-%" X 8-Ÿ2" Integral centralizers (7-%" X 8-Ÿ2" X 17-Ÿ2") b) Do not run centralizers on the window joints spaced at the top of each sand. c) Centralizers will be run on the first 40 joints to allow for adequate standoff for cement. d) The centralizer program is subject to change pending modeling and hole conditions. 4 W' Slotted Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint, floating between the collars. If any differential sticking is noticed while drilling, it may be necessary to put another centralizer per joint separated by a stop collar. Do not put any centralization on the first two joints above the bent joint. Survey and Logging Program 8-%" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Den I Neu I PWD (Den Neu recorded only) Open Hole: MDT Pressures & Fluid Samples Cased Hole: USIT Bond Lo (onl as contingenc if oor cement ·ob 6-%" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole Drilling: MWD I GR I Res I Azimuthal Den I Neu (Den/Neu recorded only) I AIM I PWD Cased Hole: None 5 Draft Permit 10/21/04 · Greater pr.oe Bay S-213A ML Permit DrillinQ Hazards and ContinQencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control I Reservoir Pressures: Sand OA OBa OBb OBc OBd Heal Psi (ppg) 2,141 (8.15) 2,160 (8.15) 2,175 (8.15) 2,194 (8.15) 2,215 (8.15) TVDss 5,052 5,097 5,132 5,177 5,227 TD Psi (ppg) 2,338 (8.9) 2,352 (8.9) 2,370 (8.9) 2,394 (8.9) 2,414 (8.9) TVDss 5,052 5,082 5,122 5,172 5,217 Comments Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures Based on Static and MDT pressures II. Hydrates and Shallow gas: A. Gas hydrates are present below S-pad, but have not been a significant issue thus far during S-Pad drilling. If hydrates are encountered follow the recommended practice and apply good drilling operational practices. III. Lost CirculationlBreathing: A. Lost circulation is possible within the Schrader interval due to the reduced pore pressure. A LCM decision tree has been developed to give direction in the event of losses. B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee. IV. Kick Tolerancellntegrity Testing: A. The 9-%" casing has been cemented to surface. B. The 7-%" flush joint casing will be cemented with 15.81b/gal cement to 500' MD above the Ma sand. C. Integrity Testing: NOTE: If the LOT I FIT is less then the minimum notify the ODE immediately Surface 1 8-3,4" 52.2 9.2 8.9 12.2 (LOT) Intermediate 16-3,4" Infinite 9.2 8.9 10.5 (FIT) NOTE: FIT's will only be done on the first horizontal lateral due to pressure connectivity between subsequent laterals. NOTE: All LOT I FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string V. Stuck Pipe A. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners moving as much as possible and run one centralizer per joint to help with standoff. VI. Hydrogen Sulfide A. S-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. In Nov. 2003 85 ppm of H2S was measured at one S-Pad well (S-05A), however all other wells tested below 20 ppm in 2004 and since the reading, S-05A has been shut in. VII. Faults There is one planned fault crossing and two possible fault crossings while drilling the well. It is also possible to encounter sub-seismic faults along the proposed well path. In the production hole sections, if a fault throws us out of section steer up as fast as possible to determine where we are within the section. This will make it easy to lows ide OH sidetrack to get back on course. Fault #1: UG1 5,202' MD Fault #2: a-sands 5,900' MD Fault #3: a-sands 6,825' MD 4,485' TVDss 4,952' TVDss 5,176' TVDss 25' Northeast throw o - 20' Northeast throw o - 35' Northeast throw CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 Draft Permit 10/21/04 · Greater p.oe Bay S-213A Ml Permit Drill and Complete Procedure Summary Pre-Ri2 Work: 1. Rig up Schlumberger slickline, and drift tubing down to the jet pump fish with drift appropriate for 3.5" chemical/jet cutter. Last well operation was CTU fishing attempts to retrieve the jet pump. Last tag was at 5,314' CTU MD. a. NOTE: If use the chemical cutter it will be required to have the tubing and annulus hydrostatic pressures equalized prior to cutting the tubing. It may be desirable to punch holes in the tubing just below the proposed chemical cut depth in order to allow for pressure equalization. Optional string shot per SOP. 2. RIH w/ chemical/jet cutter. Cut the 3-*" L-80 tubing at approximately 5,250' MD. Chemical cutter is at the discretion of the Wells Group Representative. This cut will not be fished, however a complete cut is critical to successful decompletion. a. NOTE: If chemical cutter is used, then the well should be displaced to seawater prior to making the cut. It is against SOP to use a chemical cutter in diesel. 3. RU and circulate out the diesel through the tubing cut. Once the tubing and annulus are displaced, bullhead sufficient seawater below the jet pump to fill the volume (-20 bbls) to the perfs. Observe 1.5 bpm, 2500 psi max. Previous injectivity tests that were done showed a rate through the jet pump of approximately 1.2 bbls/min @ 2,000 psi surface pressure. Freeze protect down to 2,000' TVD with diesel. a. NOTE: This will leave the well -60 psi under-balanced with the formation. A static BHP was taken on 9/18/04 which gave a reservoir pressure of 2,110 psi @ 5,000' TVDss (8.12 ppg EMW). These pressures assume a diesel gradient of 0.354 psi/ft down to 2,000' TVDss and a seawater gradient of 0.447psilft down to 5,000' TVDss. b. NOTE: The well should not be left with methanol as a freeze protect fluid, diesel only. 4. Test all packoffs and tubing hanger seals to 5,000 psi for 30 minutes. MITOA and function test all lockdown screws, repair or replace as needed. a. Verify tubing and annuls pressures and give to rig during the handover. Set a BPV in the tubing hanger and a VR plug in the 7x4-%" IA valve. Secure well. 5. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Drillina Ria Decompletion Operations: 1. MIRU Doyon 16. Circulate out diesel with seawater. Verify the well is dead. 2. Set TWC. Nipple down tree. Nipple up and test BOPE. 3. Pull and lay down the 4-%" tubing (planned tubing cut at -5,250'). 4. PU 4,200' of 4" DP and stand back in derrick. MU clean-out BHA with 4" DP and flat bottom mill (or used bit) / boot baskets / etc. RIH to top of tubing stub PU additional 4" DP, circulate and condition wellbore as required. Pump hot oil to remove excess paraffin if needed. 5. MU 7" Halliburton EZSV (running OD 5.5") and RIH and set just above tubing stub @ 5,250'). Set packer and test to 1,000 psi. Dump 10 bbls cement on top of EZSV (-261' of coverage). POOH and LD running tool. 6. MU 7" Halliburton EZSV (running OD 5.5") and RIH and set @ 3,150'. POOH and LD running tool. 7. MU 7" multistring casing cutting assembly and RIH to -2,940' MD and cut casing. Close annular and circulate annulus clean with hot seawater and Safeclean sweep, follow with 9.0 ppg mud. 8. Pull 7" casing and verify cut, circulate and reciprocate casing to clean up remainder of mud/diesel in OA. Remove wellhead pack-off and LD 7" casing. 9. RIH with cement stinger and lay in 70 bbl Class G 15.7 ppg Arctic Set 1 cement plug from EZSV @ 3,150' to 2,300' MD. (Assumes 200% excess in open hole portion from 2,940' to 2,860'.) POOH Tk ~ 1(9 - tþl OIffYlO\L Cv \. Drillina Ria Sidetrack Operations: v 1. MU 8-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at ±800' from the bit in the HWDP section and RIH to top cement plug. Dress off plug, circulate and condition mud. Directionally drill ahead to TD (Just below the Top OBd) as per directional profile to 6,591' MD / 5,227' TVD. a. Make short trip as needed, work tight spots as seen. 2. Circulate and condition mud at TD. Make sure hole is clean prior to POOH. POOH, LD drilling BHA. 3. RU Schlumberger DPC MDT tool assembly and RIH and acquire pressure and fluid samples as per the town Geologist. POOH and LD assembly. 7 Draft Permit 10/21/04 · Greater pr.oe Bay S-213A ML Permit 4. Make clean out trip to TD and circulate and condition mud as appropriate. 5. MU and run 7_%" 29.7# L-80 STL flush joint casing to TD. Cement in one stage to 500' MD above the Schrader Ma sand. Bump plug with seawater. Land casing on mandrel hanger. 6. Clean pits for displacement. Freeze protect 7_%" x 9_%" annulus with dead crude to 2,200' TVD. 7. PU 6-%" conventional assembly with MWD/GR/Resl Azimuthal Den INeu/PWD and RIH to the float collar. Test the 7- %" casing to 3,500 psi for 30 minutes. Displace well over to new Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation below rathole and perform an FIT to 12.0 ppg EMW. 8. Directionally drill ahead to TD geosteering through the OBd to TD at 12,149' MD I 5,217' TVD (prognosed). Perform wiper trip, circulate and condition mud as required. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. 9. POOH to near OBc window depth, log up across the OBc, OBa and OA windows. POH LD drilling assembly. 10. MU and run 4-%" 12.6# L-80 BTC-M slotted liner with hanger and liner top packer to TD. Position liner top packer 40' below the top OBc sand. POOH and LD liner running assembly. 11. PU the 7-%" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is near the top of the OBc sand (planned window exit: 6,312' MD). Orient whipstock to highside. Shear off Whipstock. Displace wellbore back to MOBM & mill window. POOH 12. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock. Directionally drill the OBb lateral to TD. Planned TD is 12,150' MD. Circulate and condition mud and perform wiper trip if necessary. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. POOH. 13. Run and set 4-W slotted liner with 6" aluminum billet and Weatherford GS running tool, POOH and LD liner running string. 14. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to aluminum billet in the open hole. 15. Displace well back to MOBM and KO of aluminum billet and directionally drill the OBc lateral to TD. Planned TD is 12,144' MD. Circulate and condition mud and perform wiper trip if necessary. Displace well to 9.2 ppg SFMOBM as per MI displacement procedures. POOH. 16. Pull whipstock #1. Run 4-%" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker Lateral Entry Module #1 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 17. PU the 7-%" whipstock assembly. Set the whipsock on the OBc liner top packer such that the top of the window is near the top of the OBa sand (planned window exit: 6,045' MD). Orient whipstock to highside. Shear off of Whipstock, displace well back to MOBM and mill window. POOH 18. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock. Directionally drill the OBa lateral to TD. Planned TD is 12,139' MD. Circulate and condition mud and perform wiper trip. Displace well back to SFOBM and POOH. 19. Pull whipstock #2. Run 4-%" slotted liner and Baker Hook Hanger, POOH and LD liner running string. Run Baker Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 20. PU the 7-%" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is near the top of the OA sand (planned window exit: 5,918' MD). Orient whipstock to highside. Shear off of Whipstock, displace well back to MOBM and mill window. POOH 21. RIH with 6-%" drilling assembly (with MWD I GR I Res I Azimuthal Den recorded I Neu recorded I AIM) to whipstock. Directionally drill the OA lateral to TD. Planned TD is 12,128' MD. Circulate and condition mud and perform wiper trip. Displace well back to SFOBM and POOH. 22. Pull whipstock #3. Run 4-%" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace over to 9.3 ppg KCL brine. POOH. 23. MU 4-W 12.6# BTM-M, L-80 completion assembly and R/H. See completion schematic for details. Land tubing hanger and run in lockdown screws. Reverse in brine with Corexit to protect the annulus. 24. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK-1 valve. 25. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 26. Pull two-way check. Freeze protect the well to 2,000' TVD. Install VR plug in 7-%" casing annulus valves. 27. Install BPV. Secure the well and rig down I move off Doyon 16. Post-RiQ Work: 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Pull out DCK-1 shear valve, install GL V in all of the other mandrels as per the PE. 8 Draft Permit 10/21/04 POST RIG - COMPLETION .TREE FMC 4-1/16" 5M . S 213A L 1 L2 L3 & L WELLHEAD FMC Gen 5 System - "" 11", 5M csghead w/ 7-5/B" mandrel hanger & packotf 11 " x 11". 5 M , tb g sp 0 0 I w/ 11" x 4-1/2" tubing hanger with control line ports 11" X 4-1/16" A daptor Flange ~ Phoenix Pressure Gauge with control lines to surface DATE 10/1212004 Ong KB elev (N-9ES) = 644' I New Plan 1\8 elev (016):: 61.9' 20' X 34" 215.5 Ib/tt, A53 ERW Insulated I 109' Halliburton X-Nipple (3.813"10) 12,200' TVD I Junction Specifications: Junctíon 10 through LEM Module without díverter 3.65" Cameo 4-1/2" x 1" KBG-2 GLM's /4.5" Baker sliding sleeve with 3.813"10 .. 9-518",40# L-80 BTC Csg @ 2,859' MD 4-1/2~, 12.6 Ibltt, L-IO, BTC-M Tubing Coup 00 52 Orift/lO . 3.833"/3.958" ---- 7-518" X 5-1/2" Baker PRM Packer Halliburton X-Nipple (3.813"10) 4.5" WLEG I 5,870' MD I 9.2 PPG Versapro MOBM below Completion OA Lateral 15,918'-12,128'1 6-3/4" Open hole Horizontal Laterals 4-112", 12_6 Ib/tt, L-80, BTC-M Liners Coup 00. 5.2 Orift/lO 3.833"/3.958" OBa Lateral 16,045'"12,139'1 7-5/8",297#. L-80, STL-FJ Casing Drift 6.75" Casing 10: 6.875" RA Tag TBO Top Baker LEM Assembly @ 5,868' M D Window in 7 ·5/8" casmg@ 5,918' M D Well Inclination @ Wmdow :: 62' Top Baker LEM Assembly @ 5,995' M 0 Window in 7-5/8' casing@ 6,0"'5' M 0 Well Inclination @ Window:: 65' Top Baker LEM Assembly @ 6,262' MD Window in 7-5/8" casing@ 6.312'MD Well Inclination @ Window:: 7'" REV BY OBd Lateral 16,591'.12,1491 GLhi6fl4r API NO: 50"029-22993.00 50-o29-22993-)()( 50..Q29-22993-xx 50-o29"22993-)()( 50-o29-22993-xx 7-518" Casing Shoe @ 6.591' MD COMMENTS MlK TRIOLO level' Mulli.lateral, 4-112- Gl Completion POLARIS WELL: S-213A ML g o o ~ §: ,.. II Q) -æ (,) (/) o ¡:: bp Schlumberger WELL FJELD STRUCTURE S-PAD S-213AL4 (P4) Prudhoe Bay Unit - WOA Magnetic Parameters Moder: aGGM 2004 I $urfaceLocaliOl1 Date: November 15, 2004 LaI" N702119.849 FS' 57608.7n1 Loo' W14922.95Ð TVD Ref: Rotary Table (81.90 It above Mal) StvyDate: October02,2()().4 NAD27 Alaska State Planes. Zone 04, US Feel NOI1hing: ~549.84 nus Grid Conv; +(1.90963906" Eaellng: 618929.96 flUS Scale Fact: 0.0099160616 MiscøIlaneous Slot: 5-213 Plan' S·213Al4 (P-4) OA Dip: 80.844' MagDec: +24.845" . 1800 4200 5400 2400 3000 3600 4800 6000 6600 4800 · . · . · . ; Top Whipstock ¡ ¡ ; f i f ~ ~ ;t: Base Whipstock ; ¡ ¡ ! ! ¡ : ! ¡ KOP Cry 12/100 ¡ ¡ ¡ ~.213AL4 T4 ¡ ; ¡ ¡ ..,:,. ,")op·;i~;'¡\ ·········r~¡fr····m... ····~;lr\ r;~ .m..· ··y~;\v..'~·r·· ......................... ··r:~~~\F;lm···F~'~\[/~;:;';~\:O: ~ ¡ ~' --.. ¡ ! t ! . ; , S.213ALI !PSjOBb ¡ : ¡ ¡ ! ! . ¡ ¡ S.213AL2 (PS) OBe : ~ : \ \ ¡ S.213A (P4) OBd ~",i"~"mrl¡iilmmr ~OO 5400 1800 . 2400 3000 3600 4200 4800 5400 Vertical Section (ft) Azim = 196.54°, Scale = 1(in):600(ft) Origin = 0 N/-S, 0 E/-W 6000 6600 WEll S-213AL4 (P4) -- Model: BGGM2004 Dip: 80.844' Mag Dee: +24.845" -1600 -2400 -3200 ^ ^ ^ Z g o o ~ ~ T"" -4000 II CD -¡;¡ o en en v v v -4800 -5600 -6400 -7200 . . FIELD STRUCrn<E S-PAD Prudhoe Bay Unit - WOA 0...· FS: _15·_1 51608.7 liT -. Easting" Surfaoelocalion Lat" WO 2119.849 Lon: W14922.959 NAD27 Alaska Stale PIaoo$,Zone04, US Foot 5980549.84 fRIS Grid Conv: +O.90963Q()6' 618929.96ft.U$ Scale Fad: 0.9999160676 M............ Slot $-213 Plan: S-213Al4(P4)OA -4000 -1600 -3200 -2400 µ'~~'\ L,~. · . .>.......~................................................... · . · . · . · . · . . · . · . · . ¡ So213AL1 T2 -~ 213AF.U..·..""·i,,; ............................... : Cry 6/100 : ¡ =:,o:~ !¡~ · . · . 0.._....,......"....,......................................,.......... · . · . ~ Crv6/100' ¡ ¡ ¡So213AL4 T5 -----+--... : : ~ End crv---- ~ ~ ~ · . 'H.'......._ H .... ....'.n........... 0" ........ ,.. H......... .............. H ........ ..on" · . · . · . · . · . · . · . S-213AL4 T3 End Cry ....,............. ,........"........................... · . .....'.n·h...."......,...........,.,............ · . J____'"'l d...'.....·,.........,,"............__,........,.............. · . · . TO /4-1/2" ~nr &-213AL3 (PS) OBa S-2)3AL2 (PS) 0Bc ~...................... -4000 -3£00 -2400 - ¡ 600 <<< W Scale = 1 (in):800(ft) E >>> Schlumberger TVDRef: RotaryTaÞIe(61.90ftaboveMSl) SrvyDaI6: 0ct0ber02.2004 -1600 -2400 -3200 -4000 -4800 -5600 -6400 -7200 Report Date: Client: Field: Structure I Slot: Well: Borehole: UWUAPI#: Survey Name I Date: Tort I AHD I DDlI ERD ratio: Grid Coordinate System: Location Lat/Long: Location Grid NIE Y!X: Grid Convergence Angle: Grid Scale Factor: I Top Whipstock Base Whipstock KOP Cry 12/100 Measured I Depth (It) 5918.12 5930.12 5943.12 6000.00 6100.00 Comments 90' Pt 6186.00 6200.00 6208.25 6668.38 6700.00 End Cry Cry 6/100 S-213AL4 T2 6800.00 6900.00 6906.94 7000.00 7100.00 End Cry Cry 6/100 7141.02 7814.59 7900.00 7905.73 7987.66 S-213AL4 T3 End Cry Cry 6/100 8686.59 8700.00 8707.92 8716.39 9987.85 S-213AL4 Ti End Cry Cry 6/100 Schlumberger S-213AL4 (P4) Proposal October 2, 2004 Survey I DLS Computation Method: BP Exploration Alaska Vertical Section Azimuth: Prudhoe Bay Unit - WOA t dy Vertical Section Origin: S-PAD/S·213 IIIllIIty 5 U TVDReferenceDatum: S-213 SIb. . TVDReferenceElevation: Plan S-213AL4 OA Fea III Sea Bed I Ground Level Elevation: 500292299363 Magnetic Declination: S-213AL4 (P4) / October 1,2004 Total Field S1rength: 190.803' 18544.83 ft /6.589/1.691 Magnetic Dip: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: N 70.35551358, W 149.03415537 Magnetic Declination Model: N 5980549.840 ftUS, E 618929.960 ftUS North Reference: ..0.90963906' Total Corr Mag North·) True North: 0.99991607 Local Coordinates Referenced To: Inclination I (deg) 59.29 61.21 61.21 67.94 79.79 90.00 91.66 92.64 92.64 92.60 Azimuth I Sub-Sea TVD I (deg) (It) 228.50 4960.00 228.50 4965.95 228.50 4972.22 227.24 4996.62 225.28 5024.36 223.72 223.47 223.32 223.32 221.42 92.47 92.31 92.30 92.19 92.06 215.42 209.42 209.00 203.41 197.41 5032.00 5031.80 5031.49 5010.33 5008.88 5004.45 5000.28 5000.00 4996.35 4992.64 4991.19 4967.78 4965.15 4965.00 4963.17 4950.20 4950.03 4950.00 4950.03 4959.29 WellDesign Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) 91.99 91.99 91.53 91.50 91.06 194.95 194.95 189.84 189.50 184.60 91.06 90.39 90.00 89.58 89.58 184.60 184.15 183.89 183.60 183.60 TVD (It) 5021.90 5027.85 5034.12 5058.52 5086.26 5093.90 5093.70 5093.39 5072.23 5070.78 5066.35 5062.18 5061.90 5058.25 5054.54 5053.09 5029.68 5027.05 5026.90 5025.07 5012.10 5011.93 5011.90 5011.93 5021.19 Vertical I Along Hole I Section Departure (It) (It) 1797.74 2349.77 1806.58 2360.19 1816.25 2371.58 1860.11 2422.92 1943.41 2518.81 2018.97 2031.43 2038.79 2449.11 2477.55 2570.21 2666.27 2673.03 2764.66 2864.32 2905.31 3578.21 3663.33 3669.02 3749.79 4433.48 4446.59 4454.32 4462.58 5701.72 2604.36 2618.36 2626.60 3086.24 3117.83 3217.73 3317.65 3324.58 3417.57 3517.50 3558.49 4231.65 4317.03 4322.75 4404.67 5103.48 5116.88 5124.80 5133.27 6404.70 NS (It) -1305.69 -1312.59 -1320.14 -1354.60 -1420.92 -1481.94 -1492.08 -1498.07 -1832.45 -1855.79 -1934.02 -2018.33 -2024.38 -2107.78 -2201.39 -2240.76 -2891.14 -2974.49 -2980.13 -3061.40 -3757.96 -3771.33 -3779.23 -3787.68 -5056.60 Minimum Curvature 1 Lubinski 237.400' N 0.000 ft, E 0.000 It Rotary Table 61.90 It relative to MSL 35.90 ft relative to MSL 24.845' 57608.708 n T 80.844' November 15, 2004 BGGM 2004 True North +24.845' Well Head (7) I (de;~:o J -1918.19 4.00 -1925.99 16.00 -1934.52 0.00 -1972.59 12.00 -2041.83 12.00 -2101.79 -2111.44 -2117.11 -2432.47 -2453.76 -2515.82 -2569.35 -2572.74 -2613.79 -2648.62 -2660.04 -2833.69 -2852.01 -2852.97 -2863.02 -2919.09 -2920.12 -2920.67 -2921.22 -3001.06 Tool Face I Build Rate Walk Rate I (deg) (deg/100 It) (deg/100 It) O.OOG 3.78 -1.52 O.OOG 16.00 0.00 -9.84G 0.00 0.00 -9.30G 11.83 -2.21 -8.75G 11.85 -1.96 12.00 12.00 12.00 0.00 6.00 -8.61G -8.61G O.OOG -91.03G -91.12G 6.00 6.00 6.00 6.00 6.00 -91.38G -91.63G -90.99G -91.21G -91.43G 6.00 0.00 6.00 6.00 6.00 O.OOG -95.07G -95.23G -95.04G O.OOG 0.00 6.00 6.00 6.00 0.00 -146.19G -146.19G -145.21G O.OOG -90.57G S-213IS-213IPlan S-213AL4 OAIS-213AL4 (P4) 11.86 11.86 11.86 0.00 -0.11 -0.13 -0.16 -0.17 -0.11 -0.14 -0.15 0.00 -0.54 -0.55 -0.53 0.00 -4.99 -4.99 -4.93 0.00 Northing (ltUS) 5979213.98 5979206.95 59791 99.27 5979164.22 5979096.80 -1.82 -1.80 -1.80 0.00 -6.01 5979034.85 5979024.56 5979018.48 5978679.16 5978655.49 -6.00 -6.00 -6.00 -6.00 -6.00 5978576.29 5978491.16 5978485.05 5978401.02 5978306.87 -6.00 0.00 -5.98 -5.98 -5.98 5978267.33 5977614.33 5977530.71 5977525.05 5977443.64 0.00 -3.34 -3.34 -3.42 0.00 5976746.34 5976732.96 5976725.05 5976716.59 5975446.67 Easting (ltUS) 617032.90 617025.21 617016.80 616979.29 616911.11 616852.14 616842.65 616837.08 616527.09 616506.18 616445.38 616393.19 616389.90 616350.19 616316.84 616306.05 616142.76 616125.77 616124.90 616116.14 616071.14 616070.33 616069.90 616069.48 616009.81 . Latitude Longitude N 70.35194588 W 149.04972834 N 70.35192702 W 149.04979167 N 70.35190639 W 149.04986092 N 70.35181223 W 149.05016989 N 70.35163098 W 149.05073191 N 70.35146425 W 149.05121852 N 70.35143655 W 149.05129686 N 70.35142017 W 149.05134285 N 70.35050641 W 149.05390219 N 70.35044263 W 149.05407497 N 70.35022885 W 149.05457852 N 70.34999849 W 149.05501290 N 70.34998195 W 149.05504035 N 70.34975408 W 149.0553_ N 70.34949830 W 149.0556 N 70.34939075 W 149.05574847 N 70.34761379 W 149.05715604 N 70.34738606 W 149.05730448 N 70.34737064 W 149.05731227 N 70.34714860 W 149.05739361 N 70.34524561 W 149.05784649 N 70.34520910 W 149.05785476 N 70.34518751 W 149.05785924 N 70.34516443 W 149.05786370 N 70.34169776 W 149.05850751 Generated 10/2/2004 2:20 PM Page 1 of 2 Com",e"ts Measured I Inclination I Azimuth subosea TVD I TVD Vertical I Along Hole I Ns EW I DLs I Tool Face I Build Rate I Walk Rate I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (It) (It) (deg/IOO It) (deg) (deg/IOO It) (deg/IOO It) (ltUs) (ltUs) 10000.00 89.58 182.87 4959.38 5021.28 5713.54 6416.85 -5068.73 -3001.75 6.00 -90.57G -0.06 -6.00 5975434.54 616009.31 N 70.34166463 W 149.05851303 8-213AL4 T5 10079.52 89.53 178.10 4960.00 5021.90 5789.94 6496.37 -5148.22 -3002.42 6.00 -90.99G -0.06 -6.00 5975355.05 616009.90 N 70.34144746 W 149.05851824 10100.00 89.51 176.87 4960.17 5022.07 5809.29 6516.84 -5168.68 -3001.52 6.00 -90.98G -0.10 -6.00 5975334.61 616011.12 N 70.34139157 W 149.05851089 End Cry 10126.56 89.48 175.28 4960.41 5022.31 5834.17 6543.40 -5195.18 -2999.70 6.00 O.OOG -0.10 -6.00 5975308.15 616013.36 N 70.34131918 W 149.05849605 Cry 6/100 10480.12 89.48 175.28 4963.60 5025.50 6163.66 6896.95 -5547.52 -2970.60 0.00 -90.90G 0.00 0.00 5974956.34 616048.05 N 70.34035663 W 149.05825874 10500.00 89.46 174.09 4963.79 5025.69 6182.10 6916.83 -5567.31 -2968.76 6.00 -90.89G -0.09 -6.00 5974936.58 616050.21 N 70.34030257 W 149.05824373 10600.00 89.37 168.09 4964.80 5026.70 6272.35 7016.82 -5666.06 -2953.27 6.00 -90.83G -0.09 -6.00 5974838.10 616067.26 N 70.34003283 W 149.05811774 10700.00 89.29 162.09 4965.97 5027.87 6357.61 7116.82 -5762.64 -2927.54 6.00 -90.76G -0.08 -6.00 5974741.95 616094.51 N 70.33976901 W 149.05790872 10800.00 89.22 156.09 4967.28 5029.18 6436.95 7216.81 -5856.00 -2891.87 6.00 -90.68G -0.08 -6.00 5974649.18 616131.66 N 70.33951399 W 149.05761895 10900.00 89.15 150.09 4968.70 5030.60 6509.51 7316.80 -5945.12 -2846.63 6.00 -90.59G -0.07 -6.00 5974560.80 616178.31 N 70.33927058 W 149.05725161 8-213AL4 T6 10984.76 89.10 145.00 4970.00 5031.90 6565.09 7401.54 -6016.60 -2801.16 6.00 -90.92G -0.06 -6.00 5974490.05 616224.90 N 70.33907534 W 149.05688251 11000.00 89.09 144.09 4970.24 5032.14 6574.47 7416.79 -6029.02 -2792.32 6.00 -90.91G -0.10 -6.00 5974477.78 616233.94 N 70.33904143 W 149.0568_ 11100.00 89.00 138.09 4971.92 5033.82 6631.14 7516.77 -6106.78 -2729.54 6.00 -90.81G -0.09 -6.00 5974401.03 616297.94 N 70.33882905 W 149.0563 End Cry 11104.06 88.99 137.84 4971.99 5033.89 6633.26 7520.83 -6109.79 -2126.82 6.00 O.OOG -0.08 -6.00 5974398.05 616300.71 N 70.33882081 W 149.05627 TD /4-1/2" Lnr 12128.22 88.99 137.84 4990.00 5051.90 7165.27 8544.83 -6868.87 -2039.53 0.00 O.OOG 0.00 0.00 5973650.05 616999.90 N 70.33674768 W 149.05070112 Leqal Description: Northin~ IYI [ftUSl Eastinq IXI [ftUSl Surface; 4346 FSL 4500 FEL 835 T12N R12E UM 5980549.84 618929.96 Tie-In: 4346 F8L 4500 FEL 835 T12N R12E UM 5980549.89 618929.86 S-213AL4 T2: 2321 F8L 1796 FEL 834 T12N R12E UM 5978485.05 616389.90 8-213AL4 T3: 1365 F8L 2077 FEL S34 T12N R12E UM 5977525.05 616124.90 8-213AL4 T4; 566 FSL 2146 FEL 834 T12N R12E UM 5976725.05 616069.90 S-213AL4 T5; 4477 F8L 2229 FEL 83 T11N R12E UM 5975355.05 616009.90 8-213AL4 T6; 3608 FSL 2029 FEL 83 T11N R12E UM 5974490.05 616224.90 TD / BHL; 2157 FSL 1269 FEL 83 T11 N R12E UM 5973650.05 616999.90 . WellDesign Ver 3.1 RT-8P3.03-HF5.00 Bld( do31 rt-546 ) S-213\8-213\Plan S-213AL4 OA\8-213AL4 (P4) Generated 10/2/2004 2:20 PM Page 2 of 2 ----'294 .. ···200 .. ····100 -0 100 200 ----'294 Field: Prudhoe Bay Site: PB S Pad Well: S-213 Wellpath: Plan S-213A OBd 270 180 H. Travelling Cylinder Azimuth (TFO+AZI) [degJ vs Centre to Centre Separation [100ft/in] . S-44~S~LlPBI) S-42~s¡41!J-42PB I) 90 . . Schlumberger Anticollision Report . Company: Field: Ref'e..ence Site: Ref'ei'ëI1Ce Well: Ref'e..ence Wellpath: BP Amoco Prudhoe Bay PB S Pad S-213 Plan S-213A OBd Date: 10/1/2004 Time: 14:52:27 Page: OHt..dinate(NE) Ref'e..ence: Vertical (TVD) Ref'e..ence: Well:S-213.True North S-213APlan 61.9 NO GWBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 50.00 ft Depth Range: 2870.00 to 12149.14 ft Maximum Radius: 1??oo.00 ft Reference: Error Model: Scan Method: Error Suñace: Db: Sybase Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Survey Program for Definitive Wellpath Date: 10/112004 Validated: No Version: 7 Planned From To Survey Toolcode Tool Name ft ft 155.50 2856.62 Survey #3 MWD+IFR+AK (155.50-6463.17) ~D+IFR:AK MWD + IFR [Alaska] 2856.62 4000.00 Planned: Plan #4 V1 MWD MWD - Standard 2856.62 12149.14 Planned: Plan #4 V1 MWD+IFR+MS MWD + IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in in 2870.00 2838.75 9.625 12.250 9 5/8" 6591.24 5226.90 7.000 8.750 7" 12149.14 5216.90 4.500 6.125 4 1/2" Summary < Offset Wellpath .,. Reference Offset Ct.--Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB S Pad Plan 8-111 Plan 8-111 V5 Plan: PI 2877.85 5250.00 3744.50 49.04 3695.46 Pass: Major Risk PB S Pad Plan S-203 Plan S-203 (East) V3 P 2881.16 3500.00 1771.79 50.71 1721.08 Pass: Major Risk PB 8 Pad Plan 8-203 Plan 8-203 (West) V5 P 2885.78 3000.00 1187.65 47.84 1139.81 Pass: Major Risk PB S Pad Plan S-208 Plan S-208 VO Plan: 8- 2870.00 4900.00 3504.21 65.80 3438.42 Pass: Major Risk PB 8 Pad Plan 8-400 S-400 VO Plan: S-400 w 5429.03 5484.70 1009.70 71.70 938.01 Pass: Major Risk PB 8 Pad Plan 8-401 S-401 VO Plan: 8-401 w 4323.71 4978.43 1567.05 104.95 1462.09 Pass: Major Risk PB 8 Pad S-01A 8-01A V1 4757.90 4850.00 434.56 107.83 326.73 Pass: Major Risk PB S Pad S-01B 8-01 B V1 4755.10 4850.00 431.88 107.81 324.07 Pass: Major Risk PB 8 Pad 8-01 8-01 V1 4389.20 4450.00 429.06 78.84 350.22 Pass: Major Risk PB 8 Pad 8-02APB1 S-02APB 1 V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk PB S Pad 8-02A 8-02A V1 2919.72 2850.00 670.03 42.42 627.61 Pass: Major Risk PB 8 Pad 8-02 8-02 V1 2918.54 2850.00 670.03 42.39 627.64 Pass: Major Risk PB 8 Pad S-03 8-03 V1 3305.22 3450.00 216.58 51.14 165.44 Pass: Major Risk PB 8 Pad 8-04 S-04 V1 2871.00 2900.00 760.33 40.84 719.49 Pass: Major Risk PB 8 Pad 8-05APB 1 S-05APB1 V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk PB 8 Pad 8-05A 8-05A V1 2883.81 2950.00 860.06 45.31 814.75 Pass: Major Risk PB 8 Pad 8-05 S-05 V1 2878.78 2950.00 859.37 45.19 814.18 Pass: Major Risk PB 8 Pad 8-06 8-06 V1 2890.12 3000.00 940.33 41.69 898.63 Pass: Major Risk PB 8 Pad S-07A 8-07A V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk PB 8 Pad S-07 S-07 V1 2900.07 3200.00 1663.22 61.76 1601.45 Pass: Major Risk PB 8 Pad S-08 S-08 V1 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk PB 8 Pad S-08 8-08A V2 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk PB 8 Pad 8-08 S-08B V3 2888.75 3100.03 1136.65 44.29 1092.36 Pass: Major Risk PB S Pad 8-09 S-09 V1 2895.57 3150.00 1251.18 45.20 1205.98 Pass: Major Risk PB 5 Pad S-1OO S-100 V10 2912.46 3450.00 1762.32 49.87 1712.45 Pass: Major Risk PB 8 Pad 5-101 8-101 V3 2938.56 2850.00 760.17 42.65 717.52 Pass: Major Risk PB S Pad 8-101 S-101PB1 V9 2938.56 2850.00 760.17 42.79 717.38 Pass: Major Risk PB S Pad S-102 8-102 V11 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk PB 5 Pad S-102 S-102L1 V5 2881.77 3900.00 1933.31 48.14 1885.17 Pass: Major Risk PB S Pad 8-102 8-102L1PB1 V7 2881.77 3900.00 1933.31 48.10 1885.22 Pass: Major Risk PB 5 Pad 5-102 8-102PB1 V14 2881.77 3900.00 1933.31 48.17 1885.15 Pass: Major Risk PB S Pad 5-103 S-103 V6 2881.65 3450.00 1347.35 46.75 1300.61 Pass: Major Risk PB S Pad 8-104 8-104 V1 2870.00 5400.00 3878.94 44.26 3834.68 Pass: Major Risk PB S Pad 5-105 8-105 V5 2883.61 3650.00 1555.81 39.54 1516.27 Pass: Major Risk PB S Pad S-106 S-106 V2 2887.09 3600.00 2068.73 47.39 2021.34 Pass: Major Risk PB S Pad S-106 S-106PB1 V12 2887.09 3600.00 2068.73 47.40 2021.33 Pass: Major Risk PB 5 Pad S-107 5-107 V36 2878.56 3900.00 2301.09 46.30 2254.79 Pass: Major Risk PB 8 Pad S-108 5-108 V6 2880.80 3050.00 421.07 34.55 386.53 Pass: Major Risk PB 5 Pad S-109 8-109 V8 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk PB 5 Pad 8-109 5-109PB1 V2 2870.00 3850.00 1668.21 38.44 1629.78 Pass: Major Risk PB S Pad 5-10APB1 8-10APB1 V1 2872.76 3199.96 1348.18 48.50 1299.68 Pass: Major Risk -~---,._.~- . Schlumberger . Anticollision Report Company: BP Amoco Date: 10/1/2004 Time: 14:52:27 Page: 2 Field: Prudhoe Bay Reference Site: PB 5 Pad CCHlrdinate(NE) Reference: Well:S-213, True North Reference Well: S-213 Vertical (fVD) Reference: 5-213APlan 61.9 Reference Wellpath: Plan 5-213A OBd Db: 5ybase Summary < Offset Wellpath > Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB 5 Pad 5-10A 5-10A V1 2873.72 3200.00 1347.74 48.40 1299.34 Pass: Major Risk PB S Pad 5-10 5-10 V1 2872.76 3.199.96 1348.18 48.50 1299.68 Pass: Major Risk PB S Pad 5-110 5-110V18 2870.00 6550.00 4651.88 39.67 4612.21 Pass: Major Risk PB 5 Pad 5-112 S-112 V20 2893.00 3150.00 582.00 36.48 545.52 Pass: Major Risk PB S Pad 5-113 S-113 V14 2893.56 3150.00 1528.06 . 45.75 1482.31 Pass: Major Risk PB S Pad 5-113 5-113A V3 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk PB 5 Pad 5-113 S-113B V6 2893.56 3150.00 1528.06 45.60 1482.46 Pass: Major Risk PB S Pad 5-114 5-114 V13 2892.01 3300.00 1745.06 47.40 1697.66 Pass: Major Risk PB S Pad 5-114 S-114A V6 2892.01 3300.00 1745.06 47.25 1697.81 Pass: Major Risk PB S Pad 5-115 S-115 5T V1 Plan: Plan 2922.45 2900.00 811.20 41.17 770.03 Pass: Major Risk PB S Pad 5-115 5-115V7 2922.50 2900.00 811.15 41.07 770.08 Pass: Major Risk PB S Pad 5-116 S-116V6 2916.24 2800.00 782.12 39.78 742.35 Pass: Major Risk PB 5 Pad 5-117 S-117V4 2926.49 2850.00 492.13 41.03 451.09 Pass: Major Risk PB 5 Pad 5-118 5-118 V5 4237.72 4150.00 394.20 67.71 326.49 Pass: Major Risk PB S Pad 5-119 Plan 5-119A V1 Plan: P 2873.02 4400.00 2971.07 58.88 2912.19 Pass: Major Risk PB 5 Pad 5-119 S-119 V3 Plan: Plan #4 2873.02 4400.00 2971.07 48.53 2922.54 Pass: Major Risk PB 5 Pad 5-11 S-11 V4 2886.40 3250.00 1413.56 45.69 1367.87 Pass: Major Risk PB S Pad S-11 S-11A V1 2886.89 3250.00 1413.87 45.70 1368.17 Pass: Major Risk PB S Pad S-11 S-11B V1 2887.16 3250.00 1414.05 45.70 1368.34 Pass: Major Risk PB S Pad 5-120 S-120 V4 2942.39 3000.00 1217.48 43.83 1173.65 Pass: Major Risk PB 5 Pad S-123 5-123 V10 2876.04 3150.00 1457.13 40.64 1416.49 Pass: Major Risk PB S Pad 5-12A 5-12A V1 2879.26 3300.00 1609.60 41.35 1568.25 Pass; Major Risk PB 5 Pad S-12 5-12 V1 2876.24 3350.00 1673.36 43.57 1629.79 Pass: Major Risk PB 5 Pad 5-13 5-13 V1 2883.15 3350.00 1748.65 46.55 1702.10 Pass: Major Risk PB 5 Pad 5-14 Drilling091604 S-14A V 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk PB S Pad 5-14 S-14 V5 2887.48 3450.00 1872.72 84.94 1787.78 Pass: Major Risk PB 5 Pad 5-15 S-15 V2 3609.09 3600.04 761.47 63.88 697.59 Pass: Major Risk PB S Pad 5-16 5-16 V1 3786.80 3750.00 865.48 81.27 784.21 Pass: Major Risk PB 5 Pad 5-17 S-17 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB S Pad 5-17 5-17A V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 5 Pad 5-17 S-17AL1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 5 Pad 5-17 5-17APB1 V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 5 Pad S-17 5-17B V1 5602.59 5399.98 924.89 154.16 770.73 Pass: Major Risk PB 5 Pad 5-17 5-17C V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk PB 5 Pad S-17 5-17CPB1 V2 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk PB 5 Pad 5-17 5-17CPB2 V1 5602.59 5399.98 924.89 154.05 770.84 Pass: Major Risk PB 5 Pad 5-18 5-18 V1 2912.30 2650.00 2187.88 61.21 2126.67 Pass: Major Risk PB 5 Pad 5-18 5-18A V16 2921.24 2650.00 2189.46 61.44 2128.02 Pass: Major Risk PB 5 Pad 5-19 S-19 V1 3107.07 3050.00 609.87 49.07 560.80 Pass: Major Risk PB S Pad 5-2ooPB1 S-200PB1 V4 2877.44 2950.00 297.53 43.84 253.69 Pass: Major Risk PB 5 Pad 5-200 S-2OO V2 2877.44 2950.00 297.53 43.95 253.58 Pass; Major Risk PB 5 Pad S-201 S-201 V2 2873.65 3700.00 1590.52 43.80 1546.72 Pass: Major Risk PB S Pad 5-201 S-201PB1 V11 2879.52 3700.00 1587.91 45.59 1542.32 Pass: Major Risk PB 5 Pad S-20 S-20 V4 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk PB S Pad S-20 S-2OA V2 3070.48 3050.00 734.81 53.83 680.98 Pass: Major Risk PB 5 Pad 5-213 5-213 V9 3046.08 3050.00 4.72 40.77 -36.05 FAIL: Major Risk PB 5 Pad 5-215 5-215 V9 8660.10 6930.00 1126.17 129.52 996.66 Pass: Major Risk PB 5 Pad S-216 S-216 V2 2896.92 2900.00 802.63 42.17 760.46 Pass: Major Risk PB 5 Pad 5-21 S-21 V1 3203.91 3300.00 720.37 54.95 665.42 Pass: Major Risk PB 5 Pad 5-22A 5-22A V1 3366.54 3350.00 596.94 57.10 539.84 Pass: Major Risk PB S Pad S-22B S-22B V2 3366.54 3350.00 596.94 57.21 539.73 Pass: Major Risk PB S Pad 5-22 5-22 V1 3366.59 3350.00 596.67 57.12 539.54 Pass: Major Risk PB 5 Pad 5-23 5-23 V1 3246.07 3300.00 665.69 52.31 613.38 Pass: Major Risk PB S Pad 5-24 5-24 V5 2966.51 3000.00 744.00 42.81 701.19 Pass; Major Risk PB S Pad 5-24 5-24A V1 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk PB 5 Pad 5-24 S-24B V2 3407.65 3750.00 560.69 57.55 503.14 Pass: Major Risk PB S Pad 5-25APB1 S-25APB1 V2 2881.08 3050.00 745.08 67.79 677.28 Pass: Major Risk PB 5 Pad S-25A 5-25A V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk PB 5 Pad S-25 5-25 V1 2906.47 2950.00 788.38 40.40 747.98 Pass: Major Risk PB S Pad 5-26 S-26 V1 2889.85 2950.00 833.32 38.07 795.25 Pass: Major Risk PB 5 Pad 5-27 5-27 V1 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk PB S Pad 5-27 5-27A V3 2876.48 2950.00 869.83 37.85 831.97 Pass: Major Risk PB S Pad S-27 5-27B V7 2875.81 2950.00 869.73 37.73 831.99 Pass: Major Risk ~""----_.'--'--._-.....--~...,..~.-..,...-_..-.- -.-.. . Schlumberger . Anticollision Report Company: BP Amoco Date: 10/1/2004 Time: 14:52:27 Page: 3 Field: Prudhoe Bay Reference Site: PB 5 Pad ClHlrdinate(NE) Reference: Well:S-213, True North Referenœ Well: 5-213 Vertieal (TVD) Reference: S-213A Plan 61.9 Refel"ence Wellpath: Plan S-213A OBd Db: 8ybase Summary < Offset Wellpath > Reference Offset Ctr--Ctr No-GO Allowable Site Well Wellpath MD MD Distance Al"ea Deviation Warning ft ft ft ft ft PB 8 Pad S-28 8-28 V4 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk PB 5 Pad 5-28 5-28A V1 11869.45 2950.00 910.48 111.59 798.88 Pass: Major Risk PB 5 Pad 8-28 8-28B V2 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk PB S Pad 5-28 5-28BPB 1 V7 2870.44 2950.00 910.60 39.70 870.90 Pass: Major Risk PB S Pad S-29AL 1 S-29AL 1 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk PB S Pad 8-29A Plan 8-29AL2 VO Plan: 2900.27 3050.00 1429.74 57.24 1372.50 Pass: Major Risk PB 8 Pad 5-29A 5-29A V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk PB 8 Pad 8-29 Plan 5-29B V1 Plan: 8- 2900.27 3050.00 1429.74 57.34 1372.40 Pass: Major Risk PB 8 Pad 8-29 S-29 V1 2896.89 3050.00 1427.98 57.34 1370.63 Pass: Major Risk PB 8 Pad S-30 8-30 V1 2900.00 3050.00 1016.14 38.62 977.52 Pass: Major Risk PB 5 Pad 8-31A S-31A V3 3224.79 3700.00 755.81 64.61 691.20 Pass; Major Risk PB 8 Pad 8-31 8-31 V1 3224.79 3700.00 755.81 64.61 691.20 Pass: Major Risk PB 5 Pad S-32 8-32 V1 2889.28 3200.00 1300.39 45.96 1254.43 Pass: Major Risk PB 8 Pad S-33 S-33 V1 2900.00 3100.00 1162.82 39.24 1123.58 Pass: Major Risk PB S Pad 8-34 S-34 V1 2879.25 3200.00 1439.74 36.64 1403.10 Pass: Major Risk PB S Pad 8-35 S-35 V1 2874.27 3550.00 1411.58 56.50 1355.08 Pass: Major Risk PB 8 Pad 8-36 S-36 V1 2876.35 3300.00 1489.80 38.52 1451.28 Pass: Major Risk PB 8 Pad S-37 S-37 V1 2880.94 3350.00 1567.21 39.45 1527.76 Pass: Major Risk PB 8 Pad S-38 S-38 V1 2876.14 3150.00 1268.58 36.10 1232.48 Pass: Major Risk PB S Pad 8-40A S-4OA V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk PB S Pad 8-40 S-40 V1 2881.03 2600.00 1334.40 39.59 1294.81 Pass: Major Risk PB S Pad 8-41L1 5-41L1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk PB 8 Pad 8-41PB1 S-41PB1 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk PB S Pad S-41 8-41 V1 2870.00 4700.00 2432.65 43.68 2388.97 Pass: Major Risk PB 5 Pad 8-42PB 1 S-42PB1 V1 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk PB S Pad 8-42 S-42 V2 2870.82 2900.00 172.49 34.98 137.50 Pass: Major Risk PB 8 Pad 8-43L 1 S-43L 1 V2 2870.79 3150.00 647.04 38.61 608.42 Pass: Major Risk PB 8 Pad 8-43 8-43 V3 2870.79 3150.00 647.03 38.50 608.53 Pass: Major Risk PB S Pad 8-44L 1 PB 1 8-44L1PB1 V3 2896.64 2950.00 199.72 35.01 164.72 Pass: Major Risk PB 8 Pad S-44L 1 S-44L 1 V5 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk PB S Pad S-44 8-44 V10 2896.64 2950.00 199.72 35.01 164.71 Pass: Major Risk . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELLNAME/~?( ,-Ç'-2/3A¿3 PTD# Zoy - 2/ 7 x Development Service CHECK WßA T APPLIES ADD-ONS (OPTIONS) MULTI LATERAL x (1f API Dumber last two (2) digits are between 60-69) Exploration Stratigraphic ~'CLUE'" Tbe permit is for a new weHboresegment of existing weD &Lt. 5'-' ::;2./ M . Permit NO,Zc,",-VJ API No. (fð-o.¿9- -:z.,;¿99g-c:::>/ Production. should continue to be reponed as a function' of tbe original API number. stated above. BOLE ]n accordance witb 20 AAC 25.005(f), an records, data and logs acquired for tbe pilot hole must be clearly differentiated 'in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for we)) (name on permit). PILOT (PH) SPACING EX CEPT] ON DRY DITCH SAMPLE Tbe permit is approved su bj ect ·to fuD compliance with 20 AAC 25..055~ Approval to perforate and produce is contingent upon issuance of ~ conservation order approving a spa cing e:J ception. (Company Name) assumes tbe liability of any protest to tbe spacing .eJception tbat may occur. AU dry ditcb sample sets submitted to tbe Commission must be in no greater 1han 30' sample intervals from below tbe permafrost or from wbere samples are first caught and ] 0' sample hiter:vals tbrougb target zones. . e o o Well bore seg Annular Disposal Field & Pool PRUDHOE BAV, POLARIS OIL - 640160 Well Name: PRUDHOE SA V UN POL S-213AL3 Program DEV PTD#: 2042170 Company SP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L GeoArea _890 Unit 11650 On/Off Shore On Administration 1 Penn it fee attached _ _ - - - - - -- yes_ 2 leasenumberapQropriate _ _ _ - - - - - - Yes - - - -- 3 _U_nique weltn_arne_aod oumb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Ves _ __ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 4 Well JQcated [n_a_ define_dpool_ _ - - - - - - -- yes_ SEE .t\PD fORS-2J3.t\ fORDJSCUS.SIQN Of _SPACING_. RPC 5 WellJQcated prpper _distanœ from driJling unitbpund_ary_ _ _ Yes __ 6 Well JQcated proper _distanceJrom Qtber wells_ _ _ _ _ _ Yes .7 _S~tficient.açrea9-e_aYail.able in_drillio9 unjt _ _ _ _ _ Yes_ - .. - - -- 8 Jtdeviated, js_ weJlbQre plaUncju_ded _ _ Yes_ 9 _Operator only affected party _ _ _ Yes_ 10 _Operator bas_appropriate_bond inJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes_ __ - - - - - - - - - - - - - - - - - - - - 11 Permit cao be issued wjtl)Qut çOMervaJion order _ _ _ _ Yes_ Appr Date 12 _Pe[l1')it~o be issued wjtbQut administratÌ\leapprpval _ _ Yes_ RPC 10/26/2004 13 Can permit be approved before 15-day wait Ves 14 WellJQcaled within area an_d_strata _authorized bylojectiolJ Order # (puUO# in_cJ)mmeots)_(foT Yes _ - - - - 15 AJI wel)s_wit¡'inJl4_l1Jíle_ar~a_of reyiew jdeotified (F9(!~ervjcewe!l onlYL _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ - - - - - - - - - - - - - - - - - - . - 16 Pre-produçed iojeçtor; dur.atiQn_of pre-produGtiolJ less than:3 months_ (for_service well onJy) _ _ No_ _ 17 A{;MP F:indjn9 pf Con,Si,Steocy has beeJl issued for_ this pr_oject _ Yes_ Engineering 18 _Cpoductor strinQ_prQvided _ _ _ _ - - - - NA 19 _S~úace _casinQ_pJoteGts all_known USDWs _ NA _ 20 _CMTv_oladequ_atetQ circutate_oJlconduçtor& surf~g _ NA - - - - 21 _CMT v_ol adeq uate to tie-in JQng _string to _surf çsQ_ NA _ 22 _CMT will çoyeraJl J<oQwnproductiye hQri~ons _ _ _ _ _ _ _ _ No_ Slotie_d, - - - - - - 23 _C_asinQ desigos adeQuaJe for C,_T, B&_ permafr_ost _ Yes_ _ 24 Adequ.ateJan_kage_oJ reserve pit _ _ Yes Doypo '16._ 25 Jta_re-drill" has_a_ to-403 fQr .abandonment be~m apPJoved _ _ _NA LaJerat 26 AdequateweUbore s;eParatjo_n_proposep_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes_ __ - - - - - - - - - - - - - - - - - - -- 27 Jfdjverter Je(!uired, dQes jt meet reQuJa_tions_ _ _ - - - - NA Sidetrack. _ - - - - Appr Date 28 _DJilIio9 flujd_ program schematic_& e(!uip Jistadequale_ - - - - _ Yes Max MW_9,2 ppg. . WGA 10/26/2004 29 _BOP!:s,_do_they meetreguJation _ . - - - - Yes_ _. - - - - - - 30 _BOP!:_press raJiog appropriate; Jest loJput PSig tncomments). . Yes__ Test tp3500_ psi.MSf> 1807 psi. 31 _Choke manifold cQmpJies_ w/API Rf>-53lMay 64)_ _ . _ Yes_ 32 WQrk will occ~r without pperation _shutdown _ _ _ _ _ _ _ _ . - - - - Yes 33 Js presence Qf H2S gas_ prOQable _ _ . - - -- - - - - _No NoLan H2S pad. 34 Mecha_nicalcooditioo pi w~lIs within .t\OR yerified (Foe service welJ only) _ _ _ NA ~ Geology 35 Pe(TTIit can be issued wlQ hYdrogen s_ulfide meas_ures . _ _Ves_ 36 _D_ata_preseoted on_ Qote_ntial overQressurezone$ _ _ _ _NA _ Appr Date 37 _Setsmic_analysis_ Qf shaJlow gas_z_ooes_ _ ___ __ _ _ _ _NA - - - - - - - RPC 10/26/2004 38 _Seabed _conditioo survey -<if off-sh_ore) _ . _NA. - - - -- - - -- 39 _ CQnta_cl namelphQlleJorweekly progress_reports [eXQIQratoryoolyt _ _ _NA Geologic EngineerinQ Date P"bI~ y Commissioner Date: Commissioner ::;; rDm .orS' 01 ~1/1- -/