Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-068
Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 7/23/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20250723 Well API #PTD #Log Date Log Company AOGCC ESet # END 1-25A 50029217220100 197075 6/19/2025 HALLIBURTON T40691 KU 41-08 50133207170000 224005 6/30/2025 AK E-LINE T40692 MPU F-05 50029227620000 197074 7/1/2025 READ T40693 MPU J-02 50029220710000 190096 5/21/2025 YELLOWJACKET T40694 MPU R-106 50029238160000 225033 6/8/2025 HALLIBURTON T40695 MPU R-107 50029238190000 225049 7/11/2025 YELLOWJACKET T40696 ODSK-41 50703205850000 208147 6/13/2025 HALLIBURTON T40697 ODSN-02 50703206710000 213046 6/13/2025 HALLIBURTON T40698 ODSN-16 50703206200000 210053 6/14/2025 HALLIBURTON T40699 ODSN-17 50703206220000 210093 6/14/2025 HALLIBURTON T40700 ODSN-24 50703206620000 212178 6/15/2025 HALLIBURTON T40701 ODSN-28 50703206760000 213148 6/17/2025 HALLIBURTON T40702 ODSN-36 50703205610000 207182 6/12/2025 HALLIBURTON T40703 PBU 07-23C 50029216350300 225043 7/4/2025 HALLIBURTON T40704 PBU 14-18C 50029205510300 225040 6/25/2025 HALLIBURTON T40705 PBU 15-33C 50029224480300 216075 7/3/2025 HALLIBURTON T40706 PBU C-30A 50029217770100 208169 7/1/2025 HALLIBURTON T40707 PBU E-09C 50029204660300 209095 6/30/2025 HALLIBURTON T40708 PBU F-38B 50029220930300 225029 6/12/2025 HALLIBURTON T40709 PBU GNI-02A 50029228510100 206119 7/4/2025 HALLIBURTON T40710 PBU GNI-02A 50029228510100 206119 7/3/2025 HALLIBURTON T40710 PBU GNI-04 50029233670000 207117 6/27/2025 HALLIBURTON T40711 PBU GNI-04 50029233670000 207117 6/27/2025 HALLIBURTON T40711 PBU J-07C 50029202410300 225026 5/30/2025 HALLIBURTON T40712 PBU L-105 50029230750000 202058 6/24/2025 YELLOWJACKET T40713 PBU L-108 50029230900000 202109 6/23/2025 YELLOWJACKET T40714 PBU NK-25 50029227600000 197068 6/5/2025 YELLOWJACKET T40715 PBU P2-06 50029223880000 193103 6/19/2025 HALLIBURTON T40716 PBU S-104 50029229880000 200196 6/21/2025 YELLOWJACKET T40717 T40715PBU NK-25 50029227600000 197068 6/5/2025 YELLOWJACKET Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.07.28 09:54:00 -08'00' Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: PCU-05 50283202030000 225037 7/3/2025 YELLOWJACKET T40718 TBU D-08RD 50733201070100 174003 6/4/2025 READ T40719 Please include current contact information if different from above. Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.07.28 09:53:40 -08'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU NK-25 Convert Injector to Producer Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 197-068 50-029-22760-00-00 18110 Conductor Surface Production Liner Liner 9662 80 7692 16933 1388 328 17128 20" 13-3/8" 9-5/8" 7" 4-1/2" 9173 40 - 120 41 - 7733 38 - 16971 16722 - 18110 17300 - 17328 40 - 120 41 - 5092 38 - 9098 8982 - 9662 9258 - 9272 none 520 2260 4760 7020 7500 17128 1530 5020 6870 8160 8430 17134 - 17580 7" x 5-1/2" x 4-1/2" L-80 36 - 16881 9176 - 9396 Structural 4-1/2" Baker S-3 , 16811 , 9024 4-1/2" HES S10 TRSSSV , 2061 , 2055 16811 9024 Michael Hibbert Michael.Hibbert@hilcorp.com (907) 903-5990 PRUDHOE BAY / LISBURNE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0034634 , 0034630 , 0034635 36 - 9056 31 8 100 2059 6064 3564 2111 2279 733 539 324-706 13b. Pools active after work:LISBURNE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Gavin Gluyas at 8:28 am, Feb 19, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.02.18 21:38:46 - 09'00' Bo York (1248) RBDMS JSB 021925 JJL 2/27/25 DSR-2/20/25 ACTIVITYDATE SUMMARY 12/31/2024 ***WELL S/I ON ARRIVAL*** (Conversion-permanent) RAN 4-1/2" BRUSH & 3.79" GAUGE RING TO X-NIP AT 16,800' MD (unable to work past) LRS LOADED TBG W/ 271 BBLS CRUDE RAN 4-1/2" BRUSH & 3.75" CENT TO 16,881' MD (all clear) ***CONTINUE ON 1/1/25 WSR*** 12/31/2024 Cost placeholder for 150 bbl of Schlumberger SXE acid for stimulation post add perf. 12/31/2024 T/I/O = 1474/1656/57 Assist Slickine ( CONVERSION-PERMANENT ) Pumped 275 bbls of crude down TBG while Slickline brushed. *** Fire Drill Complete *** job continued to 01-01-25*** 1/1/2025 ***CONTINUED FROM 12/31/24 WSR*** (Conversion-permanent) SET 4-1/2" PX PLUG W/ BAITED P-PRONG AT 16,868' MD PULLED RM-OGLV FROM ST# 2 AT 11,250' MD SET RM-FLOWSLEEVE IN ST# 2 AT 11,250' MD LRS CIRC'D OUT 713 BBLS 1% KCL & 200 BBLS CRUDE ***CONTINUE ON 1/2/25 WSR*** 1/1/2025 ***job continued from 12-31-24*** Pumped 5 bbls of 60/40, 713 bbls of 110*F 1% KCL & 200 bbls of crude down TBG taking returns up the IA down NK-26 Flowline. Pumped 4 bbls of 60/40 through surface lines to freeze protect. U-Tube TBG & IA to Freeze Protect. CMIT TxIA to 3000 PASSED Pressured TxIA to 3100 psi with 9.2 bbls 0* crude. TxIA lost 23/19 psi in 1st 15 min, and 10/09 psi in 2nd 15 min, for a total loss of 33/28 psi in 30 min test. ***job continued to 01-02-25*** 1/2/2025 ***CONTINUED FROM 1/1/25 WSR*** (Conversion-permanent) LRS PERFORMED PASSING STATE WITNESSED ( JOSH HUNT) PASSING CMIT-TxIA TO 2971 PSI, AND PASSING MIT-T TO 2955 PSI PULLED RM-FLOWSLEEVE FROM ST# 2 AT 11,250' MD SET RM-OGLV IN STA #2 @ 11,250' MD STATE WITNESSED MIT-T & C-MIT TO 3000PSI PULLED BAITED P-PRONG & PX PLUG FROM 16,868' MD ***CONTINUED ON 1/3/25 WSR*** 1/2/2025 ***job continued from 01-01-25*** Pumped 7.4 bbls of crude down TBG to reach max pressure of 3000 psi for Pre state MIT-T (PASSED). After first 15 min TBG lost 113 psi. After second 15 min TBG lost 32 psi. AOGCC MIT-T Target: 2700 psi / Max: 3000 psi Witnessed by: Josh Hunt ***PASSED*** Pumped 3 bbls of crude down TBG to reach max pressure of 3018 psi. After first 15 min TBG lost 25 psi. After second 15 min TBG lost 8 psi. AOGCC CMIT-TxIA Target: 2700 psi / Max: 3000 psi. ***PASSED*** Pumped 12 bbls of crude down TBG to reach max pressure of T- 3002 psi / IA-3014 psi. After first 15 min TBG lost 20 psi / IA lost 18 psi. After second 15 min TBG lost 11 psi / IA lost 10 psi. Sim Ops complete. DSO notified upon departure FWHP = 930/929/60 1/3/2025 ***CONTINUED FROM 1/2/25 WSR***(Conversion-permanent) DRIFTED w/ 3.70"x10' DUMMY WHIPSTOCK DRIFT TO 17,220' SLM ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU NK-25 Daily Report of Well Operations PBU NK-25 1/17/2025 *** WELL S/I ON ARRIVAL*** OBJECTIVE: PERFORATE INTERVAL W/2-3/4" GEO RAZOR GUN 3 spf 120 DEG PHASE MIRU YELLOW JACKET E-LINE. LAID DOWN FOR THE NIGHT ***CONTINUE OPERATION 1/18/2025*** ***WELL S/I ON DEPARTURE*** 1/18/2025 *** JOB CONTINUES FROM 1/17/2025**** MIRU YELLOW JACKET E-LINE. PT PCE 300 PSI LOW./3000 PSI HIGH PERFORATE 17091'-17121' WITH 2-3/4'' GEO RAZOR GUN 3 spf 120 DEG PHASE HSC 15 GRAMS, THE ENTERANCE HOLE DIAMETER IS 0.39", THE PENATRATION IS 37.45" CCL TO TOP SHOT=8.7' CCL STOP DEPTH=17082.3' CONFIRM SHOTS FIRED SET INTERWELL 4X7 HEX PLUG AT 17128' CCL TO MID ELEMENT=15.3". CCL STOP DEPTH=1712.7', PLUG TOOK 23 MINUTES TO SET, TAG AFTER. LOGS CORRELATED TO SLB PERF DEPTH CONTROL DATED 12-JUL-1997 *** JOB CONTINUES ON 1-19-2025*** 1/19/2025 *** JOB CONTINUE FROM1/18/2025*** (ADPERF) MIRU YELLOW JACKET E-LINE. PT PCE 300 PSI LOW./3000 PSI HIGH CORRELATE TO SLB PERFORATING DEPTH CONTROL DATED 12-JUL-1997 PERFORATE 17047'-17077' WITH 2-3/4'' GEO RAZOR 3 spf 120 DEG PHASE HSC CCL TO TOP SHOT=3.3' CCL STOP DEPTH=17043.7'. CONFIRM SHOTS FIRED. PERFORATE 16977'-17027'' WITH 2-3/4'' GEO RAZOR 3 spf 120 DEG PHASE HSC CCL TO TOP SHOT=3.3' CCL STOP DEPTH=16993.7'. CONFIRM SHOTS FIRED. PERFORATE 16977'-16989' WITH 2-3/4'' GEO RAZOR 3 spf 120 DEG PHASE HSC CCL TO TOP SHOT=5.1' CCL STOP DEPTH=16971.9' . CONFIRM SHOTS FIRED. CCL LOG CORRELATED TO SLB PERFORATING DEPTH CONTROL DATED 12- JUL-1997 ALL GUNS ARE GEODYNAMICS RAZOR CHARGES WITH 15 GRAM CHARGES ENTRANCE HOLE DIA. 0.39" PENTRATION 37.45" RDMO YELLOW JACKET E-LINE ***WELL SI ON DEPARTURE**** READY FOR TESTERS 1/26/2025 Put in test. Testing in 42 slot 1/27/2025 State test was good P.P. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, February 10, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Josh Hunt P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC NK-25 PRUDHOE BAY UN NIA NK-25 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 02/10/2025 NK-25 50-029-22760-00-00 197-068-0 N SPT 9017 1970680 2254 920 3018 2993 2985 59 59 59 59 OTHER P Josh Hunt 1/2/2025 This test was performed according to Sundry #324-706, converting the well from an injector to a producer. This test was performed on the tubing. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UN NIA NK-25 Inspection Date: Tubing OA Packer Depth 953 1000 997 996IA 45 Min 60 Min Rel Insp Num: Insp Num:mitJDH250102110002 BBL Pumped:3 BBL Returned:2.9 Monday, February 10, 2025 Page 1 of 1 9 9 9 9 9 9 9 999 9 9 9 9 9 9 Sundry #324-706 tubing. James B. Regg Digitally signed by James B. Regg Date: 2025.02.10 11:50:18 -09'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, February 10, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Josh Hunt P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC NK-25 PRUDHOE BAY UN NIA NK-25 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 02/10/2025 NK-25 50-029-22760-00-00 197-068-0 N SPT 9017 1970680 2254 948 3002 2982 2971 58 62 62 61 OTHER P Josh Hunt 1/2/2025 This test was performed according to Sundry # 324-706, This is a combo test ( IA & T) to confirm the IA integrity, There is communication down hole through a one way valve used for gas lift assist to bring the well on. Good test. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UN NIA NK-25 Inspection Date: Tubing OA Packer Depth 950 3014 2995 2985IA 45 Min 60 Min Rel Insp Num: Insp Num:mitJDH250102111451 BBL Pumped:12 BBL Returned:9.9 Monday, February 10, 2025 Page 1 of 1 999 9 99 99 9 9 99 9 9 9 9 9 Sundry # 324-706 combo test ( IA & T)communication down hole through a one way valve used for gas lift James B. Regg Digitally signed by James B. Regg Date: 2025.02.10 11:52:46 -09'00' 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU NK-25 Convert Injector to Producer Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 197-068 50-029-22760-00-00 ADL 0034634 18110 Conductor Surface Production Liner Liner 9662 80 7692 16933 1388 328 18020 20" 13-3/8" 9-5/8" 7" 4-1/2" 9613 40 - 120 41 - 7733 38 - 16971 16722 - 18110 17300 - 17328 3973 40 - 120 41 - 5092 38 - 9098 8982 - 9662 9258 - 9272 none 520 2260 4760 7020 7500 none 1530 5020 6870 8160 8430 17134 - 17580 7" x 5-1/2" x 4-1/2" L-80 36 - 168819176 - 9396 Structural 4-1/2" Baker S-3 , 16811 , 9024 4-1/2" HES S10 TRSSSV , 2061 , 2055 Date: Bo York Operations Manager Eric Dickerman Eric.Dickerman@hilcorp.com (907) 564-5258 PRUDHOE BAY 1/1/2025 Current Pools: LISBURNE OIL Proposed Pools: LISBURNE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 9:58 am, Dec 18, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.12.17 16:28:58 - 09'00' Bo York (1248) 324-706 10-404 JJL 12/19/24 Convert Injector to Producer * , ADL 0034630, ADL 0034635 SFD * Isolate existing perfs. SFD X SFD 12/19/2024 AOGCC Witnessed MITT and MITIA. DSR-12/20/24JLC 12/20/2024 Gregory C. Wilson Digitally signed by Gregory C. Wilson Date: 2024.12.22 08:32:24 -09'00'12/22/24 RBDMS JSB 122424 NK-25 : Injector to Producer Conversion Page 1 of 4 Well Name:NK-25 API Number:50-029-22760-00 Current Status:Operable, Injector Permit to Drill Number:197068 Estimated Start Date:January 2025 Rig:Slickline/Eline Regulatory Contact:Carrie Janowski Estimated Duration:4 days First Call Engineer:Eric Dickerman Cell Number:307-250-4013 Second Call Engineer:Dave Bjork Cell Number:907-440-0331 Brief Well Summary: NK-25 is one of two wells completed in the Alapah formation from Niakuk. The well was originally completed as a producer, but was converted to an injector in 2013 thinking that it would support the other Alapah producer NK-26 and it’s subsequent sidetrack NK-26A. Recent studies have shown that the two wells are in isolated reservoir blocks, and that NK-25 injection is not supporting NK-26A. An AOGCC witnessed MIT-IA passed 2,909 psi on 11/6/2022. Objective: Convert NK-25 from an Injector to a Producer within the same pool (Lisburne Oil Pool). Current Bottom Hole Pressure:4,884 psi at 9,115’ TVDss (top perf) Max. Anticipated Surface Pressure:3,973 psi (assuming 0.1 psi/ft gas gradient) Last Shut-in WHP:1,800 psi (Service Report – 9/8/2024) Min. ID:3.725” Max. Deviation:67.12 deg at 9,250’ md H2S Concentration:20 PPM (based on 2012 Production samples) Existing Casing/Tubing Program: String Pipe #/ft Grade Connection Top Bottom Surface Csg.13-3/8”68 L80 BTC Surface 7,733’ Int. Csg.9-5/8”47 L80 BTC-Mod Surface 16,971’ Prod. Lnr.7”29 NT80 Hydril 511 16,729’18,110’ Tbg.7”29 L80 NSCC Surface 2’ 5-1/2”17 L80 NSCC 2’4’ 4-1/2”12.6 L80 IBT-Mod 4’16,881’ Isolation PKR.4-/12”12.6 L80 NSCT 17,300’17,328’ NK-25 : Injector to Producer Conversion Page 2 of 4 Wellwork Procedure: Slickline: 1. Set TTP at 16,868’. 2. AOGCC witnessed CMIT-TxIA and MIT-T to 3,000 psi. Provide 24hr notice for witness. 3. Pull TTP. Eline: 4. Set HEX plug at 17,128’. 5. Add perforations in the following intervals: a. 16,976’ – 16,988’ b. 16,996’ – 17,026’ c. 17,046’ – 17,076’ d. 17,090’ – 17,120’ Well Testing: 6. Put well on production and test. Isolates existing perforations. SFD NK-25 : Injector to Producer Conversion Page 3 of 4 Current Wellbore Schematic: NK-25 : Injector to Producer Conversion Page 4 of 4 Proposed Wellbore Schematic: MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, December 21, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Kam StJohn P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC NK-25 PRUDHOE BAY UN NIA NK-25 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 12/21/2022 NK-25 50-029-22760-00-00 197-068-0 W SPT 9017 1970680 2254 2357 2353 2348 2358 77 87 86 85 4YRTST P Kam StJohn 11/6/2022 30 MinPretest Initial 15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name: PRUDHOE BAY UN NIA NK-25 Inspection Date: Tubing OA Packer Depth 143 2998 2932 2909IA 45 Min 60 Min Rel Insp Num: Insp Num:mitKPS221108202846 BBL Pumped:14.5 BBL Returned:14.6 Wednesday, December 21, 2022 Page 1 of 1 14.614.5 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Saturday, March 25, 2017 12:19 PM To: AK, GWO SUPT Well Integrity;AK, OPS GPMA OSM;AK, OPS GPMA Field O&M IL;AK, OPS LPC DS Ops Lead;AK, OPS LPC Board Operator;AK, OPS Prod Controllers;AK, OPS EOC Specialists;AK, OPS LPC DS Operator; Cismoski, Doug A; Daniel, Ryan;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Schultz, Kirsten L Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions Well Integrity;AK, OPS FF Well Ops Comp Rep; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; Pettus,Whitney; Sternicki, Oliver R;Tempel,Troy;Worthington,Aras J;AKIMS App User; Regg,James B (DOA);Wallace, Chris D (DOA) Subject: NOT OPERABLE: Injector NK-25 (PTD#1970680)Will Remain Shut In Past AOGCC MIT Test Date All, Injector NK-25 (PTD# 1970680) is due for an AOGCC-witnessed MIT-IA by the end of March 2017. The well is currently shut in as it supports NK-26, recently made Not Operable. The well will not be brought online for testing before that time. The well is reclassified as Not Operable. Please reply if in conflict with proposed plan. Matt Ross (Alternate: Josh Stephens) Well Integrity Engineering Office 907-659-8110OWE } 1(01: Cell 907-980-0552 Harmony 4530 1 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWellIntegrityCoordinator©bp.com] Sent: Tuesday, October 29, 2013 12:05 AM To: AK, OPS GPMA OSM; AK, OPS GPMA Field O&M TL;AK, OPS LPC DS Ops Lead;AK, OPS LPC Board Operator;AK, OPS LPC DS Operator; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team Lead;AK, D&C Well Services Operations Team Lead;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; Wallace, Chris D (DOA); Boman,Wade Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; Regg, James B(DOA); Climer, Laurie A Subject: UNDER EVALUATION: Injector NK-25(PTD#1970680) Inner Annulus Repressurization Diagnostics Attachments: MIT PBU NK-25 10-16-13.xls All, Injector NK-25 (PTD#1970680) passed an MIT-IA to 2500 psi on October 16, 2013, however the fluid level in the IA was at 5329 ft prior to the test. Per a phone conversation with the AOGCC, BP will continue to monitor this well while on injection. Plan Forward: 1. DHD: Monitor WHP and fluid level in the IA 2. WIE: diagnostics as needed. A copy of the MIT-IA report has been included for reference. Please call with any questions. Thank you, Laurie Climer (ACternate, Jack Dashr•ow) BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWelllnteerityCoordinator @BP.com From: AK, D&C Well Integrity Coordinator Sent: Saturday, •«ober 05, 2013 5:50 PM To: AK, OPS GPMA OSM; , :. GPMA Field O&M TL; AK, OPS LPC DS O• -•d; AK, OPS LPC Board Operator; AK, OPS LPC DS Operator; Cismoski, Dou. • Daniel, Ryan; AK, D&C Wireline Operatlo -.m Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB East - ••t Engr; AK, RES GPB West Wells Opt • 'chris.wallace @alaska.gov'; Boman,Wade Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well In r II, Coordinator; 'jim.regg @alaska.gov Subject: UNDER EVALUATION: Injector NK-25 (PTD #1970680) Inn- ; nulus Repressurization 1 RECEIVIcl) • STATE OF ALASKA APR 23 2013 AIL OIL AND GAS CONSERVATION COMM ON REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other L] Convert To Injection Performed: Alter Casing ❑ Pull Tubing Stimulate-Frac ❑ Waiver ❑ Time Extensions Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator T4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development El Exploratory ❑ 197-068-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22760-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0034634 LISB NK-25 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,LISBURNE OIL 11.Present Well Condition Summary: Total Depth measured 18110 feet Plugs measured None feet true vertical 9645.93 feet Junk measured None feet Effective Depth measured 18020 feet Packer measured See Attachment feet true vertical 9596.75 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 40-120 40-120 1530 520 Surface 7692 13-3/8"68#L-80 41 -7733 41 -5075.99 5020 2260 Intermediate None None None None None None Production 16933 9-5/8"47#L-80 38-16971 38-9079.67 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet 42013 True Vertical depth See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 784 4465 55 1690 533 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development❑ Service El Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas ❑ WDSPLU GSTOR ❑ WINJ El WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 312-370 Contact Nita Summerhays Email Nita.Summerhaysc BP.com Printed Name Nita Summerha I. Title Petrotechnical Data Technician Signatur / Phone 564-4035 Date 4/23/2013 �/ /� T ,0/44 ./ RBDMS APR 2 4 2013AV Form 10-404 Revised 10/2012 Submit Original Only • • Daily Report of Well Operations ADL0034634 ACTIVITYDAT SUMMARY •= x x emp= ep -a a es " a - -oa• o oca lon. an.•y 2/15/2013 for snow removal. ***Job Cont to 2-16-13 WSR*** T/I/0=1687/322/76 Temp=Sl Step Rate Test (INJECTIVITY TEST) Pumped 10 bbls - 10* neat meth, 51 bbls-10* DSL&491 bbls 110*SW down TBG for Injectivity Test. Inj Rates: 1 bpm @-12 psi, 2 bpm @ -3 psi, 3 bpm @ 11 psi, 4 bpm @ 32 psi Pumped 45 bbls neat meth down TBG for Freeze Protect. 2/16/2013 FWP=0/277/84 **SV, WV& SSV=S/I, MV, IA& OA=Open** T/I/O-0/317/80 Temp. - [NJ. AOGCC State witnessed ( Bob Noble ) MIT IA PASSED to 2500 psi. Pumped 16.4 bbls of 20* F meth down IA to reach test pressure . IA lost 54 psi. in the 1st 15 min. and 19 psi. in the 2nd 15 min. for a total loss of 73 psi. in a 30 min. test. Bled back 10 bbls to Final WHP-0/500/82. Well injecting on 4/2/2013 departure, IA/OA-OTG. FLUIDS PUMPED BBLS 72 METH 51 DIESEL 491 SEA WATER 614 TOTAL Perforation Attachment ADL0034634 SW Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base TVD Depth Top TVD Depth Base NK-25 11/13/1997 PER 17134 17163 9159.24 9173.6 NK-25 11/13/1997 PER 17176 17226 9180.04 9204.86 NK-25 4/7/1998 APF 17233 17246 9208.35 9214.82 NK-25 4/7/1998 APF 17246 17266 9214.82 9224.8 NK-25 4/7/1998 APF 17266 17275 9224.8 9229.3 NK-25 4/7/1998 APF 17345 17370 9264.31 9276.81 NK-25 4/4/1998 APF 17375 17395 9279.31 9289.29 • NK-25 4/4/1998 APF 17449 17453 9315.94 9317.89 NK-25 4/7/1998 APF 17460 17466 9321.3 9324.22 NK-25 7/24/1997 PER 17524 17544 9352.21 9361.8 NK-25 4/3/1998 APF 17565 17580 9371.83 9378.97 BPS BRIDGE PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK,CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF • I Casing / Tubing Attachment ADL0034634 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 94# H-40 40 - 120 40 - 120 1530 520 LINER 1388 7"29# NT-80 16722 - 18110 8962.38 - 9645.93 8160 7020 LINER 28 4-1/2" 12.6# L-80 17300 - 17328 9241.8 - 9255.81 8430 7500 PRODUCTION 16933 9-5/8"47# L-80 38 - 16971 38 - 9079.67 6870 4760 SURFACE 7692 13-3/8"68# L-80 41 - 7733 41 - 5075.99 5020 2260 TUBING 3 7"29# L-80 36 - 39 36 - 39 8160 7020 TUBING 2 5-1/2" 17#L-80 39 - 41 39 - 41 7740 6280 • TUBING 16840 4-1/2" 12.6#L-80 41 - 16881 41 - 9037.16 8430 7500 • • • Packers and SSV's Attachment ADL0034634 SW Name Type MD TVD Depscription NK-25 PACKER 16729 8905.59 7" Baker ZXP Packer NK-25 PACKER 16811 8944.25 4-1/2" Baker S-3 Packer NK-25 PACKER 17300 9181.7 4-1/2" Baker FB-1 Packer = 6"GOA/5M V N K-2 5 VELLI-EA FtfiC SA NOTES: WELL REQUIRES A SSSV. ACTUATOW BAKE KB.ELEV= 60.1' (A Al 6-7) BF.EEV L = 19.5' KOP= 1950' I 39' H 7*X 5-1/2"XO,1)=4.892" Abx Angle= 6T @ 9277 41' j-15-1/2"X 4-1/2"XO,ID=3.958" I Datum ND= 16717' Datum 1VD= 8900'BB. a D-1 2033' --I 13-3/8"FES ES CENENTER Minimum ID = 0 2061' 4-1/2"HES SEES 10 TRSSSV 4-112" HES X NIPPLE D=3.813" GAS LET IVIANCRELS STA MD ND DEV TYPE LATCH SIZE DATE 1 5339 4054 64 DMY RM 0 10/03/12 I 13-3/8"CSG,68#,L-80 BTC,ID=12.415" — 7733' 1--41 7988' —14-1/2"HES NP,ID=3.813" GAS LET MANDRELS STA ND ND DEV TYPE LATCH SIZE DATE 2 11250 6566 66 DMY RM 0 10/03/12 3 15897 8569 63 OMY RA 0 06/13/97 —1 16722' --I BKR TIEBACK RECEPTICAL,ID=?? TOP OF r LNR H 16729' 16729' H 9-5/8*X 7'BKR ZXP LTRD=6.25' 4-1/2"1BG,12.6#,L-80 131-M, —1 16881' L 16747 HBKR FLEX-LOCK LI42 HGR,13=?? .0152bpf,13=3,958" 9-518"CSG,47#,L-80 BTC-M,ID=8.681" H 16971' 16800' —14-irr HES X NP,ID=3.813" 16811' —17"X 4-1/2"BKR S-3 PKR,D=3.875" FEFFORATON SUIVIVIARY 16868' H4-1/2"HES NP,ID=3.813" REF LOG: SWS GR/CCL 07/12/97 ANGLE AT TOP FEW: 60°©17132' ' " I Note:Refer to Rod uction DB for historical perf data 16881 1-14-1/2 VVLEG,ID=3.958" SIZE SFF INTERVAL Opn/Sqz DATE 16884' —I ELMD TT-LOGGED 07/12/97 I 3-3/8" 12 17132-17161 0 11/13/97 3-3/8" 12 17173-17230 0 11/13/97 3-3/8" 6 17204-17210 0 11/13/97 3-3/8" 12 17210- 17224 0 11/13/97 3-3/8" 6 17224-17230 0 11/13/97 3-3/8" 6 17233-17253 0 04/07/98 2-1/2" 4 17248-17268 0 10/13/97 3-3/8" 6 17253-17273 0 04/06/98 2-7/8" 6 17343-17368 0 04/06/98 2-7/8" 6 17373-17393 0 04/04/98 2-7/8" 6 17447-17451 0 04/04/98 2-7/8" 6 17458-17464 0 04/06/98 17300' r X 4-1/2"BKR FB-1 PKR,ID=4.00' 3-3/8" 6 17563-17578 0 04/03/98 17315' H4-1/2"FiES XN NP,ID=3.725" 17328 1-14-1/2'1NLEG,ID=1958" 4-1/2"TBG,12.6#,L-80 13T-M, H 17328' .0152bpf, =3.958" 17330' --1ELND TT-LOGGED 07/12/97 PBTD 18020' t'fft'ffvf. AAAAAAA$ 7'LM1,29#,NT-80 BTC-TKC/HY DRLL 511. —I 18110' .0371 bpf,D=6.184" DATE REV BY 00MIVENTS DATE REV BY COMVENTS MAKUK UNIT 06/13/97 COMPLETION WELL: kE-25 04/10/01 CH/KAK CORRECTIONS FERMic No: 1970680 08/18/07 RCR/PJC DATUM/MAX ANGLE CORRECTIONS API No: 50-029-22760-00 08/21/07 '7/PJC WEIS CORRECTIONS SFr.36;T121*R15E,1371'FSL&656'F13_ 02/18/11 W3/JIVE) ADDED SSSV SAFETY NOTE 10/23/12 fitiM'JMD GLV C/0(10/03/12) BP Exploration(Alaska) Or' 771 A laska Oil and Gas w P� � � � � 4 1, s , ?, THE STATE Oil _acs � is � -- - -SAE °ALAS Conservation Commission GOVERNOR SEAN PARNELL wM 333 West Seventh Avenue O - - ** Q. SAN 2 e 2 Anchorage Alaska 99501 -3572 ALAS SUM" Main: 907.279.1433 Fax: 907.276.7542 Mark Sauve Northstar & Lisburne Production Engineer ,. 0 BP Exploration (Alaska), Inc. P.O. Box 196612 \°\: Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Lisburne Oil Pool, NK -25 Sundry Number: 312 -370 Dear Mr. Sauve: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, i Cathy P. oerster 64-- Chair DATED this V -a day of November, 2012. Encl. • .41 ` y 1V ED . STATE OF ALASKA OCT i �'` 0 1 2012 ` ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -enter Susp. Well ❑ Stimulate ❑ Alter Casing ❑ Other. Convert to Infection El • 2. Operator Name: 4. Current Well Gass: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development El Exploratory ❑ 197 -068-0 • 3. Address: Stratigraphic ❑ Service ❑ 6. API Number. P.O. Box 196612, Anchorage, AK 99519 - 6612 50 -029- 22760 -00 -00 . 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number property line where ownership or landownership changes: Spacing Exception Required? Yes ❑ No El NK -25 9. Property Designation (Lease Number): 10. Field / Pool(s): ADL0034634 ' PRUDHOE BAY, LISBURNE OIL 1 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 18110 9646 • 18020 9597 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 94# H -40 40 - 120 40 - 120 Surface 7692 13 -3/8" 68# L -80 41 - 7733 41 - 5075.99 5020 2260 Intermediate None None None None None None Production 16933 9 -5/8" 47# L -80 38 - 16971 38 - 9079.67 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): See Attachment See Attachment See Attachment See Attachment See Attachment Packers and SSSV Type: See Attachment for Packer Types Packers and SSSV MD (ft) and TVD (ft): See Attachment for Packer Depths No SSSV Installed No SSSV Installed 12. Attachments: Description Summary of Proposal ❑ 13. Well Class after proposed work: Detailed Operations Program Q BOP Sketch ❑ Exploratory ❑ Development ❑ Service ISI , 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mark Sauve Prepared by Garry Catron 564 -4424 Printed Name Mark Sauve Title Northstar & Lisburne Production Engineer Signature { Phone 564 -4660 j � / Date I e • ...%9 /U / Z ` COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3) Z, 370 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test Ld Location Clearance ❑ Other: Subsequent Form Required: — 4 0 it 7 APPROVED BY / _ / Approved by: / COMMISSIONER THE COMMISSION Date: ///_ ( — / Z VW 1 t V A Form 10 -403 Revised 1/2010 1 6 �� ; p Cate P `v` l I Z V V 41 Casing Summary . ADL0034634 Casing Length Size MD Top MD Base TVD Top TVD Base Burst Collapse Grade CONDUCTOR 80 20" 94# H -40 40 120 40 120 1530 520 H -40 LINER 1388 7" 29# NT -80 16722 18110 8962 9646 8160 7020 NT -80 LINER 28 4 -1/2" 12.6# L -80 17300 17328 9242 9256 8430 7500 L -80 PRODUCTION 16933 9 -5/8" 47# L -80 38 16971 38 9080 6870 4760 L -80 SURFACE 7692 13 -3/8" 68# L -80 41 7733 41 5076 5020 2260 L -80 TUBING 3 7" 29# L -80 36 39 36 39 8160 7020 L -80 TUBING 16840 4 -1/2" 12.6# L -80 41 16881 41 9037 8430 7500 L -80 III TUBING 2 5 -1/2" 17# L -80 39 41 39 41 7740 6280 L -80 Inur g CQ vVe Tti'S Co i if /tint of q kr000/er ft Wa ft( I too Pro;ec - %^ 74 P bNn& poet, N k -2f Wowld k Differ b T4 e /y k -26 p Gee// k 4; C4 ass TM o� leed jn 1ilL rM , Pftl. f'Ae c,,rren P ie r4 Ore4 ,5 be � P ' f�lq�ab so+► a ��� G S 6 e Off 7 le 0 11 half- -Ott ;ritigl VG /Ue. he of e if j�+4T a Io"' f p 1', 6wier jrj ect��n rot /44 L.,7/ A� /O wow- rt 0 ater V /1141titc allot h# i(/h15w;ye r4,s fort / ter of 74 /6"l CM" /X7 1/04 felt, /4 e frig n et rrdf ,q TS ho ( vvar ter or- +i c flodvt �' �ike 6,' to fate- I t); we lly ceo e1sea e_ r $� r ' / / r O »e- f CV+,er' ffo' if eo, >•r D . 64 ® p1, 7T 1^,e ; njGcfr "es� 0ccvf „f e C f f l ' 10f/(4/ I/ h® P at z C0� c o, w r' i4,4 fr'K�> ��o��y k - ( Q MU ' G lead "r0 P�1unceof (�Cover f ool 'J/• The 1 p GJ�` /: 1 (o 'J - t - 1 ( —2) wet( —f -fort G4 ail proJv(f 7'o a wormy ,'n� Q /0/.2 Perforation Attachment ADL0034634 Well Date Perf Code MD Top MD Base TVD Top TVD Base NK -25 11/13/97 PER 17134 17163 9159 9174 NK -25 11/13/97 PER 17176 17226 9180 9205 NK -25 4/7/98 APF 17233 17246 9208 9215 NK -25 4/7/98 APF 17246 17266 9215 9225 NK -25 4/7/98 APF 17266 17275 9225 9229 NK -25 4/7/98 APF 17345 17370 9264 9277 • NK -25 4/4/98 APF 17375 17395 9279 9289 NK -25 4/4/98 APF 17449 17453 9316 9318 NK -25 4/7/98 APF 17460 17466 9321 9324 NK -25 7/24/97 PER 17524 17544 9352 9362 NK -25 4/3/98 APF 17565 17580 9372 9379 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK BRIDGE BPS PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED • RPF REPERF Packers and SSV's Attachment ADL0034634 Well Facility Type MD Top Description TVD Top NK -25 PACKER 16729 7" Baker ZXP Packer 8966 NK -25 PACKER 16811 4 -1/2" Baker S -3 Packer 9004 NK -25 PACKER 17300 4 -1/2" Baker FB -1 Packer 9242 • • II • pill 2006 / Dec 7, 2007 (TLH) • . Wireline Work Request N K -25 Alaska Wells Group Well: NK -25 AFE: APBWEINR H2S: 20 ppm, 4/20/2012 Date: 09/24/12 Engineer: Mark Sauve 10 -403? N IOR 0 WBL Cat. REG COMPL 10 -404? N AWGRS Job Scope: PRESSURE TEST (INTEGRITY) Problem Description NK -25 is scheduled for conversion to a SW injection well in 2013. Prior to initiating the surface conversion work it will be necessary to confirm the well integrity downhole. The existing live GLV's will need to be dummied off and a MIT -IA then performed. Min ID: 3.725 17,315' MD, 4.5" Otis XN Nipple Last Tag 18,016' MD w/2.55" bailer on 6/30/12 Integrity History Review > 12/27/08: Caliper TBG > 05/11/11: Treated conductor w /15.3 gal of RG -2401 Remedial Plan - WIRELINE ACTION Obj: Pre -SW injection conversion: Demonstrate integrity _ 1. S: Dummy off GLV's in stations #1 (5339' MD) & #2 (11,250' MD) 2. F: MIT -IA to 3000 psi e `L a r �"' ' /1/o h fi n-06 ee h rs ih ad ran+ Establish LLR if fails. TREE= 6" CIW 5M • WELLHEAD , FMC N K -2 5 SAFETY NOTES: WELL REQUIRES A SSSV. ACTUATOR= BAKER KB. ELEV = ' 60.1' (AKA L6 -25) BF. EV = 19.5' KOP= 1950' �- J 39' I� 7" X 5 -112" XO, ID = 4.892" Max Angle = 67° @ 9277' - --- --I 41' H5 -1/2" X 4 -1/2" X0, ID = 3.958" Datum MD = 16717' Datum Ti../11::' V D 8900' SS a D-I 2033' H 13 -3/8" HES ES CEMENTER I Minimum ID = 3.725' @ 17315' • 2061' I- 4 -1/2" HES SERIES 10 TRSSSV ID = 3.813" 4 -1/2" HES X NIPPLE GAS LIFT MANDRELS STA MD I TVD DEV TYPE LATCH' SIZE DATE 1 5339 4054 64 DOME RA 1/4" 10/18/97 1 13 -3/8" CSG, 68 #, L -80 BTC, ID = 12.415" I-J 7733' I---AI ' ' ( 7988' 1-14-1/2" HES X NIP, ID = 3.813" I GAS LIFT MANDRELS STA MD TVD DEV TYPE LATCH SIZE DATE En 2 11250 6566 66 SO RA 5.16" 10/18/97 3 15897 8569 63 DMY RA - 06/13/97 16722' H BKR TIEBACK RECEPTICAL, ID = ?? I TOP OF 7" LNR H 16729' 16729' H9-5/8" X 7" BKR ZXP LTP,ID = 6.25" I 4 -1/2" TBG, 12.6 #, L -80 IBT -M, - I 16881' 0152bpf, ID = 3.958" 16747' I-1 BKR FLEX -LOCK LNR HGR, ID = ?? I 19 -5/8" CSG, 47 #, L -80 BTC-M, ID = 8.681" I-1 16971' 1 ' I 16800' H4-1/2" HES X NIP, ID = 3.813" I 8 X I 16811' 1-17" X 4-1/2" BKR S-3 PKR, ID = 3.875" I PERFORATION SUMMARY REF LOG: SWS GR/CCL 07/12/97 ' ' I 16868' I -14 -1/2" HES X NIP, ID = 3.813" I ANGLE AT TOP PERF: 60° @ 17132' Note: Refer to Production DB for historical perf data , I 16881' I -14 -1/2" WLEG, ID = 3.958" I SIZE SPF INTERVAL Opn /Sqz DATE I 16884' I-1 ELMD TT - LOGGED 07/12/97 1 3 -3/8" 12 17132 - 17161 0 11/13/97 3 -3/8" 12 17173 - 17230 0 11/13/97 3 -3/8" 6 17204- 17210 0 11/13/97 3 -3/8" 12 17210 - 17224 0 11/13/97 3 -3/8" 6 17224 - 17230 0 11/13/97 3 -3/8" 6 17233 - 17253 0 04/07/98 2 -1/2" 4 17248 - 17268 0 10/13/97 3 -3/8" 6 17253 - 17273 0 04/06/98 2 -7/8" 6 17343 - 17368 0 04/06/98 2 -7/8" 6 17373 - 17393 0 04/04/98 2 -7/8" 6 17447 - 17451 0 04/04/98 2 -7/8" 6 17458 - 17464 0 04/06/98 I 17300' Hr X 4-1/2" BKR FB -1 PKR, ID = 4.00" I 3 -3/8" 6 17563 - 17578 0 04/03/98 ir I 17315' H4-1/2" HES XN NIP, ID = 3.725" I 17328' H4 -1/2' WLEG, ID = 3.958" I 4 -1/2" TBG, 12.6 #, L -80 IBT -M, -1 17328' .0152bpf, ID= 3.958" 1 17330' H ELMD TT - LOGGED 07/12/97 I I PBTD H 18020' .1111 111' 7" LNR, 29 #, NT -80 BTC -TKC/ HYDRILL 511, -1 18110 .0371 bpf, ID = 6.184" DATE REV BY COMMENTS DATE REV BY COMMENTS NIAKUK UNIT 06/13/97 COMPLETION WELL: NK -25 04/10/01 CH/KAK CORRECTIONS PERMIT No: 1970680 08/18/07 RCR/PJC DATUM / MAX ANGLE CORRECTIONS API No: 50- 029 - 22760 -00 08/21/07 ?/ PJC WBS CORRECTIONS 1371' FSL & 656' FEL, SEC 36; T12N; R15E 02/18/11 MB /JMD ADDED SSSV SAFETY NOTE BP Exploration (Alaska) N K -25 / N K -26 area N ot • 1�av • i to J)K --24 ,PP-- ( -9054) ' .aqy ylill I —2A -8988 — ( -9118) i Legend LCU Depth -8973 Alapah C Depth ( -9125) N 1 mile Coastline • ► • • Ferguson, Victoria L (DOA) From: Sauve, Mark A [Mark.Sauve @bp.com] Sent: Thursday, November 08, 2012 1:43 PM To: Ferguson, Victoria L (DOA) Cc: Schwartz, Guy L (DOA) Subject: RE: NK -25 Conv to WI: (PTD 197 -068, Sundry 312 -370) Attachments: NK -25 USIT log dated June 9th 1997.pdf Victoria, I have attached a scanned section of the NK -25 Ultrasonic Cement Log (USIT -NGS) run on June 9 1997. It shows overall good to excellent cement bond from 17400' MD to 16,752' MD with a couple of small pockets of "fair" cement bond at 16850' - 16863' and 16,932'- 16940' MD. Top perforation in well NK -25 is at 17,132' MD. Please let me know if you need more information. Sorry it took so long to get back to you. Mark Sauve Northstar & Lisburne Production Engineer BP Exploration - Alaska 900 E. Benson Blvd Anchorage, AK 99519 Work Ph #: 907 - 564 -4660 Work Fax #: 907 - 564 -4440 CeII Ph #: 907 - 748 -2865 E -mail: sauvema(Wbp.com From: Ferguson, Victoria L (DOA) f mailto :victoria.ferquson @alaska.govl Sent: Tuesday, October 23, 2012 10:58 AM To: Sauve, Mark A Cc: Schwartz, Guy L (DOA) Subject: FW: NK -25 Conv to WI: (PTD 197 -068, Sundry 312 -370) Mark, We received a map with 1 /4 mile radius circle for Well NK -25. Could you provide a summary of cement information for the primary cement job around the injection interval in well NK -25? Thanx in advance, Victoria From: Ferguson, Victoria L (DOA) Sent: Friday, October 12, 2012 9:43 AM To: 'mark.sauve @bp.com' Cc: Schwartz, Guy L (DOA) Subject: NK -25 Conv to WI: (PTD 197 -068, Sundry 312 -370) Mark, For this conversion to WI, we will need an Area of Review(AOR) of wells within % mile radius of the injection well (20AAC25.402). Please provide a map showing the injection well, % mile radius circle and wells within that region. Also, please review and report on the mechanical condition and cement data for each well that has penetrated the injection zone within % mile radius of the proposed injection well. 1 • I I COMPANY: ARCO Alaska, Inc. WELL: NK -25 t I FIELD: NIAKUK BOROUGH: NORTH SLOPE STATE: ALASKA ULTRASONIC CEMENT LOG Schlumberger USIT -NGs fL U _ a m E 1371' NSL & 656 WEL Bev.: KB. 60.1 F O o5 ' z AT SURFACE G.L. 19.3 F _ S z Q OF D.F. 58.6 F U Permanent Datum: M.S.L Elev.: 0 F z z `� 0 Log Measured From RK.B 60.1 F above Perm. Datum _ O o c Drilling Measured From: RK.B. - D R M E API Serial No SECTION TOWNSHIP RANGE m LL - t 0 50- 029 - 22760 36 12N 15E _ Logging Date 9-JUN -1997 Run Number 2 - Depth Driller 18020 F Schlumberger Depth 17990 F _ Bottom Log Interval 17990 F ' f TopLog Interval 16721 F t' % r I j f °g L ! _ Casing Fluid Type BRINE AND SEA WATER Ta ' i 4, Salinity Density 9.1 LB/0 Fluid Level 1 BIT/CASING/TUBING STRING Bit Size 8.500 IN From 16971 F To 18114 F Casing/Tubing Size 7.000 IN , Weight 29 LB/F . Grade L -80 From 16721 F To 17285 F Maximum Recorded Temperatures ! I I Logger On Bottom i Time 9-JUN -1997 f 23:56 I_ unrt rvumoer , Location 1 wt i i 4b1 Da 1 f I 1 *v- , 1,l::t..n M. t I .rk•uWL wr.t pM- 4 . 3 1 riltrIeaueu rsy 1 LC a rrrn f 1 Q .7UU It .1.330.t/ V3:U /:It) A El • 29.00 LB/F 29.00 16883.5 03:09:08 29.00 LB /F 29.00 16872.5 03:09:11 - Liquid From USLI to UCCI Gaseous From USGI to USLI • mby Cement From USBI to RHF4 Liquid index (USLI) 0 (- -) I Spectroscopy Gamma Ray I Green Cement Index (UCCI) (SG R) 0 (G API) 100 0 (---) 1 RB (UCAZ) -40 (DEG) 35t; X 41060000 .. 410G 0003 43000 L }-- ammo 03000 1.0000 26000 1.5000 26003 z0000 ac000 25000 ! as000 a0000 I 05000 40000 a5000 1.8000 45030 — 40000 25000 50000 CCL (CCLU) S� o ae 6o Gas index (USGI) -17 ( -- --) 3 i 55330 65003 1 0 (----) 1 I 6, Process. flags 7.5003 7.0000 (UFLG) 60000 7.51302 61000 8.0000 (----) 8.2330 63000 I Raw Acoustic "s6 Imp. (AIBK) Acoustic imped. with thresholds (AIBK) simommia ti•Ima.ht;I -- . - -- --- - ..- m IP ' llil - -- �__r�•1 ._ MI1•IIIIHNIt•INt•Itiltw• .. A..._. _ . _ ... . 1 ..............„.,.., ,.... _ -___ 1 I I It 21 r . a sTL.- – ''- . * -• • I ‘ = MI IN_ s! - �5 _ _a, slKa L MCMS►. man:. ,. 4. . __I_ 1.1• [4� - ;- ..��M,� •.•.C..IM � M=��� �s - - – - _i7 ___t.ta 1 1111111111110111 ■•s!I•IgM -. - -- r 11•1111111111 11611M11/C-M _ _ a r---- ��A[!� , -4 ... 1 r ���r�i7as�a1 -- , •, • y _ - -- 16$00 ��� MI MIL it w sC_.._- ., � - y ����� PLC. n I 4 IIIIIIIIIIImm 111111111111•111•11111•110101.1111111 s;, " 4 1 sl..•..:r i7 t . ---- L-a.__. Lalg ssLIIIA .ate �s!►� 1 Lw. ... I III ill _ . _ ra.a•11 rya. 11111••10111t IIIIIMBssN•1 1 A / AN k , illitA...• ._, _t, A A A i j ... . LIA . . ir' A, k'l . \ _:\ .g. . , ' . ,, 0----4,- i i: i - - ----1 . -. ' . iii I ' • i ' - - - L , i_A......' - . • t -, - ..4..L._.._... ____, , . -- - . . I I I t 1 r it ! . - ; t . --4----.------- 1 ; , ____A ' f i t --- lf — ------- ' — — . -' 1 1 *" ' 1 ' - I ... -. ----.---- --.. . I . . , ! f . , .-- - I . 1 , . -------- - '1 _ _,_____ _ ______ ., ,,, - : _. - . ' . , , • ! , . . • . . • r .! I ' . i 1: • • . . • - ,._.„.._. - . .-- .r. - - .- .r. ' _ . p , _ . r.f ..: f: - 1. 1 ' • - - VP 0111.:fw . i L :-I• . • i• ,,, . A ,.:, , „ ._.„ + , . , . - ... - - . - - ' . • 1 , . . ..„ • e ' ■ I I ' I. l I MI I* A a _: NIUNIM11.11111111P I " a Urea i ni al =MI warion s mum iiimrals= ram ra mulamasizsimrrass, iiiiiiimoumumuumm mu minim summiihaur mumollEINKI EMIIIIIIM1111111111111111Mall111111111 111111111111111111111111111111111111111 NIIIII111111111111111111111111111 11111111111111111111111111111411111111111111111111111 lumulnINIMINIIIFIIIIMMIUMINENIMASEIMPINIMIMENIMMUNIIIMIIIII 11111111111M111111111M1111111111111111111110,IIIIIIMU IIIIMINOPIIIIIIIFATAIMIIIIIIIIVIIIIIMINIMMIIIIIMMIIIVEINIIIIIIIPININ 1111111111M111111111111111111111111111111111110111111111111 ifillIMM IMMIIIIIMIIIIIIIN imuummillIMMIlattuatualibmaiumannummtm nunimuimm Num Immo nomulmummummimm ....mumuummul ertiolmmom•mmillimommunalvolumusmalul IlmmullemiIIIIIIIIIIIIIIIIIIIiimmulimmillIIIIIIIIIIIIIIIimmilmIll imummumnuom mullousualuiumumumu 11111111110 . II 11111 III , . , . 1 III I t 8 I a . - iti o to v o 8 nuuuu IIIIIIuIII IIMNIMMUNI■IInIP UIU- nnn..111nnu... IInnuInuuIInIaInHuniwin ■nnniuiUI1111 ��i11i111r1�ii1� ►n.7��.���. -. EIIII .I.. IIIRII i/I1■IIIII 5.111111111111 IInInn�IMPAly rfi�I=I II . 1 11 il'L'Ihvailit r rSiSir sivalarii .'^+►Sirw i narkiratziwai ��ansz■Il' z T IF II ^:S'ir lir' It""w'"masz '!ICuii iii^w� Ii i�w'''i''i."�IL`ms1 w. ■ 1l111iI11•15 ■111111111111II11nSn111111111111n1SH11111 1� 1111111111W1unR1 Il nnntnnniININEXm SS • • '� 1 . `• iii y 1 i► ; ( ,, . 4 , .,, � '1it ■ t , x ; p • i 1 • � � , ' , ' Hip.i,i � ill l } ., ! + � �,; 4 > • e • i ■, 14 4-;i? , , r i ft * � l 1 , ' - -, . • r _ ' Y 11.: � . r� � , 1 , 7- ` 1 e 4 r , ' � .k 5 t r , i 1 \i� '14' I' F., nil • el i {'i 3 . z . ', I .` i I , • ' J .. -. J. . i t 1 ' • • �S ' : • I i i 0 ! i i �� i : . • I! i 1 ■ • i 1 • • -- . -i s. 4fii} ° _ , -- . ,; • _- '{..T' - _R- -. .. ' It - t • ` i • -, 4 , F 1 t 1 t ' � t i i ! 1 I t t — t .� . e, -- _. i ,,.u.r 3111 11 ' '�.:.n� It' ' ' . t t. . 7 1 1 11F " 7 - 11, # .t r -' ' ion I WE ' VIP t ' r 4. t. A' _!- - r -- - } ,, _:tit... p(,o l ftctq ; _ ,, ... -. i ,, . -- - --- .. -- - ---� -- - - -- *., ' • t ,� i v 'r -I i r -. i ,,,,,, `. 7 ,'� - t- . i► _ r rr- . _ ■ h t i , f A' �F r , i ' e ' Y i �� f _ ? y v. J � � 14,1\kx l � r 4 I 1 • • 1 t , BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 July 6, 2011 JU 8 Nil Mr. Tom Maunder O btd Alaska Oil and Gas Conservation Commission \ r ‘;1 A i 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA Niakuk Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA Niakuk that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Mehreen Vazir, at 659-5102. Sincerely, Gerald Murphy BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10.404) Niakuk Date: 05/15/11 Corrosion Initial top of Vol. of cement` Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na _gal NK -01A 1780280 500292015801 P&A 3/9/91 NA NA NA NA NA NK -02A 1780790 500292018001 P&A 3/13/91 NA NA NA NA NA NK -03 1780940 500292035000 P&A 4/14/80 NA NA NA NA NA NK-04 1842000 500292121700 P&A 4/14/98 NA NA NA NA NA NK-05 1850270 500292129000 P&A 4/15/98 NA NA NA NA NA NK-06 1852760 500292148600 P&A 4/15/98 NA NA NA NA NA NK -07A 2010830 500292241001 0.2 NA 0.2 NA 0.9 4/30/2011 NK-08A 2010290 500292249101 0.2 NA 0.2 NA 0.9 4/30/2011 NK-09 1941400 500292251800 2.1 NA 2.1 NA 17.0 4/30/2011 NK -10 1931840 500292242500 1.5 NA 1.5 NA 11.9 4/30/2011 NK -11A 2020020 500292278901 1.5 NA 1.5 NA 11.9 4/30/2011 NK -12C 2030550 500292241403 1.8 NA 1.8 NA 31.0 4/30/2011 NK -13 1981340 500292269300 2.3 NA 2.3 NA 22.1 5/4/2011 NK -14A 2080310 500292288801 1.8 NA 1.8 NA 17.0 5/4/2011 NK -15 1970320 500292274500 1.8 NA 1.8 NA 18.7 5/4/2011 NK -16 1940220 500292244700 2.5 NA 2.5 NA 20.4 5/4/2011 NK -17 1961650 500292270900 3 NA 3 NA 20.4 5/4/2011 NK -18 1931770 500292242100 2 NA 2 NA 17.0 5/6/2011 NK -19A 2010700 500292250701 1.8 NA 1.8 NA 15.3 5/8/2011 NK -20A 2050400 500292242901 2.1 NA 2.1 NA 13.6 5/9/2011 NK -21 1940860 500292248700 2 NA 2 NA 22.1 5/15/2011 NK -22A 2012280 500292240201 1.5 NA 1.5 NA 11.9 5/11/2011 NK -23 1940350 500292245500 3.6 NA 3.6 NA 20.4 5/10/2011 NK -25 1970880 500292276000 2.5 NA 2.5 NA 15.3 5/11/2011 NK -26 1940050 500292244000 2.9 NA 2.9 NA 17.0 5/11/2011 NK -27 1950210 500292254700 2.3 NA 2.3 NA 13.6 4/30/2011 NK -28 1980930 500292267800 Sealed Conductor NA Sealed Conductor NA NA NA NK -29 1981900 500292272400 1.7 NA 1.7 NA 10.2 4/30/2011 NK-38A 2042410 500292254001 3.1 NA 3.1 NA 13.6 5/8/2011 NK-41A 1971580 500292277801 9.1 NA 9.1 NA 54.0 5/9/2011 NK-42 1941080 500292249900 2 NA 2 NA 13.6 5/9/2011 NK-43 2010010 500292299800 1 NA 1 NA 5.1 5/9/2011 NK-81A 2060350 500292289301 14 NA 14 NA 110.5 6/15/2011 NK -62A 2030470 500292285201 1.3 NA 1.3 NA 13.6 5/4/2011 NK -65A 2050830 500292286901 1 NA 1 NA 8.5 5/6/2011 bp ) ,t ... ,\If.'I1. -...~~ ~...- ~~- ~...-- ..~ F...... .,.,.,.\.. ". Terrie Hubble Technical Assistant GPB Drilling & Wells BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 April 25, 2005 Alaska Oil & Gas Conservation Commission 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501 """Rt:C 1:..,' r;-·: r~v\,.· E! ."ID.· i ¡. .,~\. ·t.r:u, Ii : . Reference: Well Name Changes A DR rí)) i"'1 2005 ~)"i\ II q. ,f:,} if I jÀ~Ia~~(~ Œ~ ,& GaI~ CQ]u]i3. iC{())I1]i"J1i~8~rûi~~ ;~rûr,~fí]ra\g~ Direct: (907) 564-4628 hubbletl@bp.com Mr. Steve McMains: The operator respectfully requests that the following wells within the Prudhoe Bay Unit be re-named as follows: Current Name New Name Permit # API # L6;..25 N K-25 197-068 50-029-22760-00 L6026 NK-26 194-005 50-029-22440-00 N K-34 L5-34 1 98-085 50-029-22883-00 NPBST03 WB-03 192-145 50-029-22322-00 We recently have learned that while we have been using these corrected names for some time, an official request to the AOGCC to make these changes was never generated. These new well names identify more correctly the surface location from which the wells were drilled. Thank you very much for your assistance in this matter. Sincerely, 4~ Terrie Hubble Distribution Well Files PDC Marian Sloan Performance Unit Partners Conoco Phillips - Sandra Lemke Exxon - Phillip Thibodeaux SC,t-\.NNEL, !~PH i ~'i :?OU~ STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMIS' REPORT uF SUNDRY WELL OPERATIL, NS J. Operations performed: Operation shutdown__ Stimulate f'''''''_ ~ Plugging__ Perforate Pull tubing __ Alter casing __ Repair well __ Other __ Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 ¢. Location of well at surface 3908' FNL, 653' FEL, Sec. 36, T12N, R15E At top of production interval At effective depth At total depth 3408' FNL, 2082' FEL, Sec. 33, T12N, R16E 5. Type of Well: Development Exploratory Stratigraphic Service · Datum elevation (DF or KB) 60.1 feet 7. Unit or Property name LISBURNE UNIT 8. Well number L6-25 9. Permit numbedapproval number 10. APl number 500292276000 11. Field/Pool Lisburne Pool 12. Present well condition summary Total Depth: measured: true vertical: Effective Depth: measured: true vertical: 18110 feet Plugs (measured) 9646 feet feet Junk (measured) feet None. None. Casing Length Size Conductor 80' 20" Surface 7734' 13 3/8" Intermediate 16971 9 5/8" Liner Cemented 260 SX Arctic Set 3330 sx PF 'E', 880 sx Class G & 50 se PF 'C' 740 sx Class G Measured depth 80' 7734' 16971' 1388' 7" 400 sx Class G 16722-18110' True vedical depth 80' 5076' 9080' 8962-9646' Perforation depth: measured 17134-17163', 17176-17226', 17233-17246', 17246-17266', 17266-17275', 17345-17370', true vertical 9099-9113', 9119-9144', 9148-9154', 9154-9164', 9164-9169', 9204-9216', 9219-9229', Tubing (size, grade, and measured depth) 41/2in. 12.6# L-80 @ 0-16880' MD, 41/2in. 12.6#L-80@ 17300-17328~l~iGINA~E6EiV[D Packers and SSSV (type and measured depth) 3 8/9 X 8 2/3 PKR @ 16722' MD, 3 4/5 x 4 1/2 SSSV @ 2061' MD 3. Stimulation or cement squeeze summary ~'- ~ ~9 Intervals treated (measured) Treatment description including volumes used and final pressure Please refertothe a~ached Alast,:,a 0il & Gas Cons. Commission Anchorage 14. Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation n/a n/a n/a Subsequent to operation 1076 4000 0 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations F16. Status of well classification as: Oil_~x Gas __Suspended __ Tubing Pressure n/a 520 ,f 17.1 hereby certify.,,t~y,~'~o./,r,~oing is true and correct to the best of my knowledge. Signed /~'/~_¢~~;'~ I,'~ _ Title Service Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE L6-25 ACID ROPE PERFORATION/FOAM ACID FRACTURE OF ALAPAH B ZONE 7/26/97 1. MIRU coiled tubing unit and acidizing equipment. 2. In preparation for the ROPE job: Circulated 5% HCI acid from 17,560' MD back to surface Laid in 15% HCI acid from 16,890'-17,560' MD. Displaced well with nitrogen - estimate top of fluid at 16,520' MD. 3. RDMO CTU. 7/27/97 1. MIRU E-line unit. Held pre-job safety meeting. 2. Pressured well to 8500 psig with 610 MCF nitrogen 3. Shot 17,526-46' MD with 2.5" guns loaded with deep penetrator charges at 4 spf, 180 degrees phasing. Wellhead pressure quickly bled down to 4200 psig. 4. RDMO E-line and MIRU acid fracture treatment equipment. 5. Pumped 50 bbls of 75 quality foam/15% HCI at 2 bpm with 7600 SCFM Nitrogen. Average treating pressure was 4100 psi. 6. Chased acid with 200 Bbls of 2% KCI water energized with 500 SCF/B nitrogen at 15 bpm (5300 psi treating pressure), followed by 138 Bbls plain 2% KCI water. 7. Displaced wellbore with dead crude. 8. RDMO acid frac equipment. ACID ROPE PERFORATION/FOAM ACID FRACTURE OF ALAPAH C ZONE 10/11/97 1. MIRU coiled tubing unit and acidizing equipment. 2. In preparation for the ROPE job: Laid in 15% HCI acid from 16,200'-17,294' MD. Displaced well with nitrogen - estimate top of fluid at 16,250' MD. 3. RDMO CTU. 10/13/97 1. MIRU E-line unit. Held pre-job safety meeting. 2. Pressured well to 8500 psig with 600 MCF nitrogen. 3. Perforated 17,248-68' MD with 2.5" OD guns loaded with 10.5 gram charges (0.29" entry hole diameter, 17.32" total target penetration) at 4 shots/foot, 180 degree phasing. 4. RDMO E-line and MIRU acid fracture treatment equipment. 5. Pumped pad of 50 bbls of 75 quality foam/2% KCI water Nitrogen (3200-4100 psi treating pressure). 6. Pumped 50 bbls of 75 quality foam/15% HCI at 2 bpm with 7600 SCFM Nitrogen (4060-4600 psi treating pressure). 7. Chased acid with 200 Bbls of 2% KCI water energized with 500 SCF/B nitrogen at 13.6 bpm (5500-6500 psi treating pressure), followed by 94 Bbls plain 2% KCI water. 8. Displaced wellbore with dead crude. 9. RDMO acid frac equipment. DIESEL/XYLENE WASH OF ALAPAH B & C PERFORATIONS 10/30-31/97 1. MIRU coiled tubing unit. 2. Squeezed 65 bbls 50% diesel/50% at 1.6 bpm behind pipe reciprocating coiled tubing across perforations (1455psi average wellhead squeeze pressure/1570 psi maximum). 3. Let soak for 1 hour. 4. Squeezed 75 bbls 50% diesel/50% at 1.3 bpm behind pipe reciprocating coiled tubing across perforations (1670psi wellhead squeeze pressure). 5. Displaced wellbore with dead crude. 6. RDMO coiled tubing unit. DIESEL/XYLENE SOLVENT BREAKDOWN OF ALAPAH B & C PERFORATIONS 11/12/97 1. MIRU coiled tubing unit. 2. Pumped the following fluids in the order listed into the Alapah B & C Zone perforations at 17,524-44' MD and 17,246'-66' MD: a) 500 bbls 50% diesel/50% xylene at 6.5 bpm, let soak for 2 hours, followed by b) 250 bbls 50% diesel/50% xylene at 6.5 bpm, let soak for 2 hours, followed by c) 250 bbls 50% diesel/50% xylene at 6.0 bpm, let soak for 2 hours, followed by i) 270 bbls diesel at 5.0 bpm 3. Performed matrix injectivity test by pumping the following fluids in the order listed into the above noted perforations: a) 10 bbls diesel at 1.0-1.5 bpm, followed by b) 5 bbls diesel at 1.5-2.0 bpm, followed by c) 20 bbls diesel at 2.5-3.5 bpm Determined frac gradient of 0.7#/ft. 4. RDMO coiled tubing unit. ADD ALAPAH C ZONE PERFORATIONS 11/14-15/97 1. MIRU E-line unit. 2. Perforated 17,134-63' MD and 17,176'-226' MD with 3-3/8" OD guns loaded with 34 gram charges (0.40" entry hole diameter) at 12 shots/foot, 60 degree phasing. 3. RDMO E-line unit. ALAPAH C ZONE ACID STIMULATION 12/7/97 1. MIRU coiled tubing unit and acidizing equipment. 2. Set inflatable bridge plug with CTU at 17,240' MD. 3. Pumped the following acidizing fluids in the order listed across the C Zone perforations at 17,134-63' MD and 17,176'-226' MD: a) 5 bbls diesel, followed by b) 20 bbls 50% diesel/50% xylene at 1.5 bpm, followed by c) 155 bbls 5% DAD acid at 0.6 bpm, followed by d) 30 bbls 50% diesel/50% xylene at 1.0 bpm, followed by e) 117 bbls 5% DAD acid at 0.85 bpm, followed by f) 20 bbls 50% diesel/50% xylene at 0.8 bpm, followed by g) 108 bbls 5% DAD acid at 0.6 bpm, followed by h) 41 bbls 50% diesel/50% xylene at 1.75 bpm, followed by i) 20 bbls diesel at 1.8 bpm, followed by j) 24 bbls methanol water (freeze protect tubing). 4. RD acidizing equipment. ALAPAH C ZONE ACID STIMULATION 4/10/98 1. MIRU coiled tubing unit and acidizing equipment. 2. RIH and set inflatable treating packer on CTU at 17,310' MD. 3. Pumped the following acidizing fluids in the order listed across the B Zone perforations at 17,524-44' MD: a) 25 bbls b) 15 bbls c) 20 bbls d) 80 bbls e) 20 bbls f) 80 bbls g) 83 bbls h) 52 bbls 2% KCl at 1.5 bpm, followed by 60% methanol/40% water at 0.5 bpm, followed by 50% diesel/50% xylene at 0.5 bpm, followed by 10% DAD acid at 0.8 bpm, followed by 50% diesel/50% xylene at 0.6 bpm, followed by slick 2% KCl at 1.8 bpm, followed by 10% DAD acid at 1.8 bpm, followed by 50% diesel/50% xylene at 0.5 bpm, followed by i) 81 bbls slick 2% KCI at 1.1 bpm, followed by j) 40 bbls 60% methanol/40% water (freeze protect tubing). 4. RD acidizing equipment. Well: L6-25 SSSV-- NIP -- GPMA WEB Date: 6~2~99 : APl: 500292276000 SSSV Type: CAT I - SSSV Annular Fluid: A/L gas Well Type: PROD Orig Compltn: 7/27/97 Last W/O: Ref Log Date: 6/1/97 Angle @ TS: deg @ Angle @ TD: 57 deg @ 18110 Rev Reason: Drifted for paraffin Last Update: 1/30/99 Reference SWS LWD Log: RAB/ADN Last Tag: 17983 SLM TD: 18110 ftKB Last Tag Date: 7~27~98 Max Hole 67 deg @ 9277 Angle: Date Note 6/23/97 Minimum ID: 3.725" HES XN NIPPLE @ 17315' MD Genb~t NOteS:: ::: Date Note 6/23/97 Well Status: ACTIVE ~. PKR -- 6/23/97 Tubing Hanger: FMC @ ~6Q'~.~vlD Last Tag Depth @ 18110 _EX-LOCK -- HGR NIP -- PKR -- NIP -- Ped -- Ped -- Perf Perf -- PKR NIP TT Ped · Ped · Ped · Ped · Perf ~ JEWELRY Depth TVD Type Description ID 2061 2054 SSSV 4-1/2" HES SERIES 10 TRSSSV, ID=3.813" 3.810 7988 5190 NIP 'X' NIPPLE, ID = 3.813" 3.810 16722 8962 PKR BACKER TIE BACK SLEEVE & ZXP PACKER 3.900 16738 8970 FLEX-LOCI< BAKER FLEX-LOCK HGR 4.000 HGR 16800 8999 NIP 'X' NIPPLE, ID = 3.813" 3.810 16811 9004 PKR BAKER S-3, 4-1/2" X 7" PACKER 3.900 16868 9031 NIP 'X' NIPPLE, ID = 3.813" 3.810 16880 9037 'CF WLEG ( 16,884' ELM) 3.900 17300 9242 PKR BAKER FB-1,4-1/2" X 7" PACKER 3.900 17315 9249 NIP 'XN' NIPPLE, ID -- 3.725" 3.720 17328 9256 'Cl' WLEG ( 17,330' ELM) 3.900 Size Weight Grade Top Btm Feet Description 13.375 68.00 L-80 0 7734 7734 SUR. CASING 9.625 47.00 L-80 0 16971 16971 PROD. CASING 7.000 29.00 L-80 16722 18110 1388 LINER s-All Size Weight Grade Top Btm Feet Description 4.500 12.60 L-80 0 16880 16880 TUBING 4.500 12.60 L-80 17300 17328 28 TUBING Gas Lift :M:ahdrelsNaives: ] Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date Vlv Mfr Type Run Comment HES TB SPM HES R-20 1.5 RA 0.250 2300 10/18/97 GLM HES TB SPM HES RDO-20 1.5 RA 0.313 0 10/18/97 GLM HES TBSPM HES D14-R 1.5 RA 0.000 0 6/10/97 GLM ] I 5339 4054 2 11250 6566 3 15897 8569 Interval 'rVD Zone ~t~tu~FeetSPF Date Type Comment 17134- 9159- 9174 17163 17176- 9180-9205 17226 17233- 9208-9215 17246 17246- 9215-9225 17266 17266- 9225-9229 17275 17345- 9264-9277 17370 17375- 9279-9289 17395 17449- 9316-9318 17453 17460- 9321-9324 17466 17524- 9352-9362 17544 17565- 9372-9379 17580 29 1211/13/9' IPERF 50 1211/13/9'IPERF 13 6 4/7/98 APERF 17233-266 Reperf, 17266-273 Aped 20 10 4/7/98 APERF 17233-266 Reperf, 17266-273 Aped 9 6 4/7/98 APERF 17233-266 Reperf, 17266-273 Aped 25 6 4/7/98 APERF Aped, acid stimed 4711/98 20 6 4/4/98 APERF Aped, acid stimed 4/11/98 4 6 4/4/98 APERF Aped, acid stimed 4/11/98 6 6 4/7/98 APERF Aped, acid stimed 4/11/98 20 4 7/24/97 IPERF Acid-ROPE pedorated 15 6 4/3/98 APERF Aped Perf ~ PERMIT DATA 97-068 RAB-MD 97-068 R_AB-TV/) 97-068 A]DN-TVD 97-068 AI)N-MD 97-068 7716 97-068 USIT-NGS 97-068 USIT-NGS 97-068 NGR SPEC 97-068 NGR SPC 97-068 RFT 97-068 NGR SPEC 97-068 FMS 97-068 BHC/SL 97-068 97-068 97-068 97-068 97-068 AOGCC Individual Well Geological Materials Inventory T DATA PLUS ~30'0-18060 ~300-9600 ~9000-9600 ~/16800-18020 ~SCHLUM GR/DCR/GR/RAB/ADN ~"BL(C) 16721-17990 JBL 16721-17990 L/16721-18020 ~6721-18020 ~/16971-18081 q~'16902-17285 ~/16902-17285 ~z~16971-18081 8053 ~_CHLUM BHC/NGT/FMS/LDWG GYRO MULTI SHOT ~/DRILL PIPE SCHLLTM 0-8800 GYRO MULTI SHOT ~ASING SCHLUM 0-17900 DEFT-PSP ~16950-17700 10-407 ~OMPLETION OATE .7 I~?1~?1 DAILY WELL OPS R * ~12~?1~ TO //1~'1~71 Are dry ditch samples required? yes ~And received? Was the well cored? yes~_.rAnalysis & description received? Are well tests required?~/~e~___~Received? ye~'~ JlA Well ±s in compliance In'itial COMMENTS Page: 1 Date: 07/19/99 RUN RECVD FIN~uL 06~26/97 FINAL 06/26/97 FINAL 06/26/97 FINAL 06/26/97 1-5 06126197 FINAL 07/11/97 FINAL 07/31/97 FINAL 07/31/97 FINAL 07/31/97 FINAL 07/31/97 FINAL 07/31/97 FINAL 07/31/97 FINAL 07/31/97 1 07/31/97 12/16/97 12/16/97 FINAL 07/24/98 FINAL 07/24/98 T D BOX -- 9 t"30'/'9'7 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 1136O Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Lisburne Well Job # Log Description Date BL LIS RF Sepia Tape Color Print L4-3 0 PRODUCTION PROFILE 9 8 0 5 0 5 I 1 L6-2 5 PRODUCTION PROFILE 9 8 0 5 0 2 I 1 L6-25 DEFT 980502 I I SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 97-68 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22760 4. Location of well at surface ..~ .~';~;.,;~'i: i..~. ~ itl~;~ATl~l~ 9. Unit or Lease Name 1371' NSL, 656' WEL, SEC. 36, T12N, R15E, UM ' Lisburne At top of productive interval ,_; 10. Well Number 1919' NSL, 2266' EWL, SEC. 32, T12N, R16E, UM i :?~'~"'"':'~'" ' NK-25 (L6-25) At total depth~ "~_ ./~...~__~._ ; ! 11 Field and Pool 1905' NSL, 3197' EWL, SEC. 32, T12N, R16E, UM ............. Lisburne Oil Pool 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 60'I ADL 034635 12. Date Spudded4/26/97 113' Date I'D' Reached i 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °fish°re 16' N°' °f C°mpleti°ns5/31/97 7/27/97 N/A MSL One 17. Total Depth (MD+TVD)18110 9658 FT,I18' Plug Back Depth (MD+TVD) II 9' Directi°nal Survey 120' Depth where SSSV set 121' Thickness °f Permafr°st18020 9611 FT, [~Yes I--]No 2061' MD 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD, GR/CDR, RAB/ADN, FMS, RFT/Sonic, USIT/GR/Gyro, GR/CCL ~'3. CASING, LINER AND CEMENTING RECORD CASING SE-I riNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 80' 30" 260 sx Arctic Set (Approx.) .... :13-3/8"68# L-80 41' 7733' 16" _~315 sx PF 'E', 880 sx 'G', 50 sx PF 'C' 9-5/8" 47# L-80 38' 16971' 12-1/4" i760 sx Class 'G' 7" 29# L-80 16722' 18110' 8-1/2" _;'50 sxClass 'G' 24. Perforations open to Production (MD+TVD of Top and 25. lURING I'(ECORD Anchorage Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diammeter, 12 spf 2-1/2" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 16880' 16811' MD TVD MD TVD 4-1/2", 12.6#, L-80 17300'-17328' 17300' 17134'-17163' 9176'-9190' 17246'-17266' 9231'-9241' 17176'-17226' 9197'-9221' 17524'-17544' 9369'-9379' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 250 bbls diesel 17132'-17163', 17176'-17230' Acid ROPE frac, 370 bbls of 5% HCL acid 17248'-17268' Acid ROPE frac, 75 bbls of 15% HCL acid 17524'-17544' Acid ROPE frac, 75 bbls of 15% HCL acid ...... 27. PRODUCTION TEST ~ ~ a ~ Date First ProductiOnAugust 10, 1997 IMeth°d °f Operati°n (Fl°wing' gas lift' etc')Gas Lift U K t ~ItlN~L Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Fi'ow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Alapah Zone D 16976' 9101' Alapah Zone C 17042' 9132' Alapah Zone B 17358' 9287' i Alapah Zone A 17768' 9486' RECEIVED 199i' 31. List of Attachments Summary of Daily Drilling Reports, Surveys ~ka 0il & Gas Cons, CommissJ~ Anchorage 32. I herebYsigned certifYsteve Shultzthat t h e,~fc_regoi ng~/'~ ,'~-~ is~t rue,..p~.~u,.~and, correct97_68'%~. to the best of my knowledge } "'C/?--~/~ ~.~.~ ~, · -%_ Title Senior Drilling Engineer Date ~' NK-25 Prepared By Name/Number: Kathy Campdamor, 564-5122 Well Number Permit No. / Approval No. ....... J NSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. iTEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. iTEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. iTEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. iTEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). iTEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. iTEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Performance Enquiry Report Operator BP Exploration Date 02:53, 16 Dec 97 Page 1 The analysis is from - 15:30, 04 May 97 - to - 15:30, 04 May 97 Programs in Result Table: NK-25 Drill and Complete Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) NK-25 Event 15:30, 04 May 97 15:30, 04 May 97 0 hr 0 min Obtained leak off 14.7 Hole Size MDR 12-1/4 Progress Report Facility NK Main Pad Well NK-25 Rig POOL 7 Page 1 Date 15 December 97 Date/Time 24 Apr 97 25 Apr 97 26 Apr 97 27 Apr 97 28 Apr 97 29 Apr 97 30 Apr 97 01 May 97 02 May 97 21:00-06:00 06:00-08:00 08:00-12:00 12:00-15:30 15:30-22:00 22:00-22:30 22:30-23:00 23:00-04:30 04:30-06:00 06:00-09:30 09:30-17:00 17:00-18:30 18:30-06:00 06:00-19:30 19:30-20:00 20:00-21:00 21:00-21:30 21:30-06:00 06:00-06:30 06:30-07:30 07:30-11:00 11:00-12:00 12:00-15:30 15:30-17:30 17:30-01:00 01:00-02:00 02:00-05:00 05:00-06:00 06:00-07:00 07:00-08:00 08:00-08:30 08:30-09:00 09:00-09:30 09:30-12:00 12:00-12:30 12:30-13:00 13:00-02:00 02:00-02:30 02:30-03:00 03:00-04:30 04:30-05:30 05:30-06:00 06:00-06:30 06:30-00:00 00:00-02:00 02:00-06:00 06:00-06:30 06:30-09:30 09:30-13:00 13:00-18:30 18:30-20:30 20:30-22:00 22:00-02:00 02:00-02:30 Duration 9hr 2hr 4hr 3-1/2 hr 6-1/2 hr 1/2 hr 1/2 hr 5-1/2 hr 1-1/2 hr 3-1/2 hr 7-1/2 hr 1-1/2 hr 11-1/2 hr 13-1/2 hr 1/2 hr lhr 1/2 hr 8-1/2 hr 1/2 hr lhr 3-1/2 hr lhr 3-1/2 hr 2hr 7-1/2 hr lhr 3hr lhr lhr lhr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 13hr 1/2hr 1/2 hr 1-1/2 hr lhr 1/2 hr 1/2 hr 17-1/2 hr 2hr 4hr 1/2 hr 3hr 3-1/2 hr 5-1/2 hr 2hr 1-1/2 hr 4hr 1/2 hr Activity Rig moved 40.00 % Rig moved 70.00 % (cont...) Skid rig Installed Mud pumps Rigged up Divertor Singled in drill pipe to 60.0 ft Tested Divertor Made up BHA no. 1 Circulated at 60.0 ft Circulated at 60.0 ft (cont...) Drilled to 700.0 ft Cleared Header box Drilled to 1550.0 ft Drilled to 2996.0 ft (cont...) Circulated at 2996.0 ft Pulled out of hole to 1775.0 ft R.I.H. to 2996.0 ft Drilled to 3950.0 ft Drilled to 4031.0 ft (cont...) Circulated at 4030.0 ft Pulled out of hole to 1109.0 ft Pulled BHA Made up BHA no. 2 R.I.H. to 4031.0 ft Drilled to 4770.0 ft Circulated at 4770.0 ft Pulled out of hole to 1100.0 ft Pulled BHA Pulled BHA (cont...) Made up BHA no. 3 Serviced Block line Serviced Top drive Functioned M.W.D. tool R.I.H. to 4011.0 ft R.I.H. to 4770.0 ft Cleared Shaker discharge line Drilled to 6270.0 ft Serviced Mud shakers Drilled to 6365.0 ft Circulated at 6365.0 ft Pulled out of hole to 4770.0 ft R.I.H. to 6100.0 ft R.I.H. to 6365.0 ft (cont...) Drilled to 7750.0 ft Circulated at 7750.0 ft Pulled out of hole to 1108.0 ft Pulled out of hole to 1108.0 ft R.I.H. to 7750.0 ft Circulated at 7750.0 ft Pulled out of hole to 213.0 ft Pulled BHA Rigged up Casing handling equipment Ran Casing to 2060.0 ft (13-3/8in OD) Circulated at 2060.0 ft Facility NK Main Pad Progress Report Well NK-25 Rig POOL 7 Page Date 2 15 December 97 Date/Time 03 May 97 04 May 97 05 May 97 06 May 97 02:30-05:00 05:00-05:30 05:30-06:00 06:00-08:30 08:30-09:30 09:30-10:00 10:00-12:30 12:30-13:00 13:00-14:30 14:30-15:30 15:30-16:30 16:30-18:30 18:30-20:30 20:30-22:00 22:00-23:30 23:30-01:00 01:00-02:00 02:00-02:30 02:30-04:00 04:00-04:30 04:30-06:00 06:00-11:00 11:00-16:30 16:30-19:30 19:30-21:30 21:30-22:30 22:30-00:00 00:00-01:30 01:30-02:30 02:30-06:00 06:00-07:00 07:00-08:30 08:30-09:00 09:00-10:00 10:00-10:30 10:30-13:00 13:00-14:30 14:30-15:30 15:30-03:30 03:30-05:00 05:00-06:00 06:00-07:00 07:00-08:00 08:00-09:00 09:00-09:30 09:30-11:00 11:00-12:00 12:00-16:00 16:00-17:00 17:00-06:00 06:00-06:30 06:30-07:00 07:00-11:00 11:00-13:00 Duration 2-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr lhr 1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr lhr lhr 2hr 2hr 1-1/2 hr 1-1/2 hr 1-1/2 hr lhr 1/2hr 1-1/2 hr 1/2 hr 1-1/2 hr 5hr 5-1/2 hr 3hr 2hr lhr 1-1/2 hr 1-1/2 hr lhr 3-1/2 hr lhr 1-1/2 hr 1/2 hr lhr 1/2 hr 2-1/2 hr 1-1/2 hr lhr 12 hr 1-1/2 hr lhr lhr lhr lhr 1/2 hr 1-1/2 hr lhr 4hr lhr 13hr 1/2 hr 1/2hr 4hr 2hr Activity Ran Casing to 3735.0 ft (13-3/8in OD) Circulated at 3735.0 ft Ran Casing to 13-3/8in (4000.0 ft OD) Ran Casing to 5741.0 ft (13-3/8in OD) (cont...) Circulated at 5741.0 ft Installed DV collar Ran Casing to 40.0 ft (13-3/8in OD) Installed Casing hanger Circulated at 7733.0 ft Rigged up Handling equipment Circulated at 7734.0 ft Mixed and pumped slurry - 574.000 bbl Displaced slurry - 1145.000 bbl Functioned DV collar Circulated at 2033.0 ft Mixed and pumped slurry - 500.000 bbl Displaced slurry - 304.000 bbl Rigged down Handling equipment Rigged down Divertor Installed Casing head Rigged up BOP stack Rigged up BOP stack (cont...) Tested Well control Serviced Fluid system Made up BHA no. 4 Singled in drill pipe to 2034.0 ft Drilled installed equipment - DV collar Singled in drill pipe to 3500.0 ft Circulated at 3500.0 ft Singled in drill pipe to 6720.0 ft Singled in drill pipe to 7637.0 ft (cont...) Circulated at 7637.0 ft Rigged up Fluid system Tested Casing Serviced Top drive pipe handler Drilled cement to 7780.0 ft Circulated at 7780.0 ft Performed formation integrity test Drilled to 9082.0 ft Circulated at 9082.0 ft Pulled out of hole to 8230.0 ft Pulled out of hole to 7677.0 ft (cont...) Serviced Block line Serviced Drillfloor / Derrick R.I.H. to 9082.0 ft Circulated at 9082.0 ft Rigged up Survey wireline unit Conducted electric cable operations Rigged down Survey wireline unit Drilled to 10180.0 ft Drilled to 10250.0 ft (cont...) Repaired Flowline Drilled to 10589.0 ft Circulated at 10589.0 ft Facility NK Main Pad Progress Report Well NK-25 Rig POOL 7 Page Date 3 15 December 97 Date/Time 07 May 97 08 May 97 09 May 97 10 May 97 11 May 97 12 May 97 13 May 97 14 May 97 15 May 97 13:00-14:30 14:30-15:30 15:30-22:30 22:30-00:00 00:00-06:00 06:00-07:00 07:00-08:00 08:00-10:30 10:30-11:30 11:30-13:30 13:30-16:00 16:00-16:30 16:30-20:30 20:30-21:00 21:00-22:00 22:00-23:30 23:30-02:00 02:00-02:30 02:30-06:00 06:00-06:00 06:00-10:00 10:00-12:00 12:00-13:00 13:00-14:00 14:00-21:30 21:30-02:00 02:00-06:00 06:00-06:00 06:00-08:30 08:30-09:00 09:00-06:00 06:00-15:30 15:30-19:00 19:00-21:30 21:30-22:30 22:30-06:00 06:00-06:15 06:15-08:00 08:00-19:00 19:00-22:00 22:00-01:00 01:00-02:30 02:30-06:00 06:00-08:30 08:30-09:30 09:30-16:00 16:00-17:30 17:30-21:00 21:00-23:00 23:00-23:15 23:15-23:30 23:30-02:30 02:30-03:30 03:30-04:30 Duration 1-1/2 hr lhr 7hr 1-1/2 hr 6hr lhr lhr 2-1/2 hr lhr 2hr 2-1/2 hr 1/2 hr 4hr 1/2 hr lhr 1-1/2 hr 2-1/2 hr 1/2 hr 3-1/2 hr 24 hr 4hr 2hr lhr lhr 7-1/2 hr 4-1/2 hr 4hr 24 hr 2-1/2 hr 1/2 hr 21hr 9-1/2 hr 3-1/2 hr 2-1/2 hr lhr 7-1/2 hr 1/4 hr 1-3/4 hr llhr 3hr 3hr 1-1/2 hr 3-1/2 hr 2-1/2 hr lhr 6-1/2 hr 1-1/2 hr 3-1/2 hr 2hr 1/4 hr 1/4 hr 3hr lhr lhr Activity Pulled out of hole to 9082.0 ft R.I.H. to 10589.0 fi Drilled to 10962.0 ft Circulated at 10962.0 ft Pulled out of hole to 3000.0 ft Pulled out of hole to 1127.0 ft (cont...) Laid down 741.0 ft of 5-1/2in OD drill pipe Pulled BHA Repaired Flowline Repaired Drillstring handling equipment Made up BHA no. 5 Rigged up Drillstring handling equipment Singled in drill pipe to 5000.0 ft Serviced Block line Serviced Top drive Singled in drill pipe to 5900.0 ft R.I.H. to 10962.0 ft Circulated at 10962.0 ft Drilled to 11161.0 ft Drilled to 12745.0 ft (cont...) Drilled to 13032.0 ft (cont...) Circulated at 13032.0 ft Pulled out of hole to 10960.0 ft R.I.H. to 13032.0 ft Drilled to 13502.0 ft Repaired Kelly/top drive hose Drilled to 13710.0 ft Drilled to 15192.0 ft (cont...) Drilled to 15246.0 ft (cont...) Repaired Mud pumps Drilled to 15757.0 ft Drilled to 16038.0 ft (cont...) Circulated at 16038.0 ft Pulled out of hole to 13032.0 ft R.I.H. to 16038.0 ft Drilled to 16404.0 ft Drilled to 16414.0 ft (cont...) Serviced Mud pumps Drilled to 16971.0 ft Circulated at 16971.0 ft Backreamed to 14917.0 ft Reamed to 16971.0 ft Circulated at 16971.0 ft Circulated at 16971.0 ft (cont...) Circulated at 16971.0 ft Pulled out of hole to 7700.0 fi Serviced Block line Pulled out of hole to 378.0 ft Pulled BHA Retrieved Wear bushing Installed BOP test plug assembly Tested BOP stack Rigged up Top ram Tested BOP stack Facility NK Main Pad Progress Report Well NK-25 Page Rig POOL 7 Date 4 15 December 97 Date/Time 16 May 97 17 May 97 18 May 97 19 May 97 20 May 97 04:30-06:00 06:00-06:30 06:30-07:00 07:00-10:30 10:30-21:00 21:00-22:00 22:00-03:00 03:00-05:00 05:00-06:00 06:00-09:00 09:00-11:30 11:30-12:30 12:30-15:00 15:00-15:05 15:05-15:15 15:15-17:30 17:30-17:45 17:45-18:00 18:00-18:30 18:30-20:00 20:00-22:30 22:30-02:30 02:30-05:00 05:00-06:00 06:00-06:01 06:01-09:30 09:30-10:00 10:00-10:30 10:30-15:30 15:30-17:30 17:30-19:00 19:00-22:30 22:30-00:00 00:00-06:00 06:00-06:30 06:30-07:30 07:30-08:30 08:30-09:30 09:30-11:00 11:00-12:00 12:00-13:00 13:00-13:30 13:30-14:30 14:30-15:30 15:30-16:30 16:30-22:00 22:00-22:30 22:30-23:00 23:00-23:30 23:30-03:30 03:30-04:00 04:00-06:00 06:00-06:00 06:00-06:00 Duration 1-1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 10-1/2 hr lhr 5hr 2hr lhr 3hr 2-1/2 hr lhr 2-1/2 hr 0hr 0hr 2-1/4 hr 1/4 hr 1/4 hr 1/2 hr 1-1/2 hr 2-1/2 hr 4hr 2-1/2 hr lhr 0hr 3-1/4 hr 1/2 hr 1/2 hr 5hr 2hr 1-1/2 hr 3-1/2 hr 1-1/2 hr 6hr 1/2 hr lhr lhr lhr 1-1/2 hr lhr lhr 1/2hr lhr lhr lhr 5-1/2 hr 1/2hr 1/2 hr 1/2 hr 4hr 1/2 hr 2hr 24 hr 24 hr Activity Repaired Kelly cocks Repaired Kelly cocks (cont...) Tested Kelly cocks Rigged up Casing handling equipment Ran Casing to 7743.0 ft (9-7/8in OD) Circulated at 7700.0 ft Ran Casing to 13000.0 ft (9-7/8in OD) Circulated at 13000.0 ft Ran Casing to 9-7/8in (13800.0 ft OD) Ran Casing to 16971.0 ft (9-5/8in OD) (cont...) Circulated at 16971.0 ft Rigged down Casing handling equipment Circulated at 16971.0 ft Pumped Water spacers - volume 10.000 bbl Tested High pressure lines Circulated at 16971.0 ft Pumped Water spacers - volume 20.000 bbl Pumped Water based mud spacers - volume 70.000 bbl Mixed and pumped slurry - 156.000 bbl Displaced slurry - 1236.200 bbl Wait on cement Installed Slip & seal assembly Installed BOP stack Rigged up Pipe ram Rigged up Pipe ram (cont...) Tested BOP stack Removed BOP test plug assembly Installed Wear bushing Made up BHA no. 7 R.I.H. to 5450.0 ft Circulated at 5450.0 ft R.I.H. to 11000.0 ft Circulated at 11000.0 ft R.I.H. to 16400.0 ft R.I.H. to 16884.0 ft (cont...) Circulated at 16884.0 ft Tested Casing - Via annulus and string Drilled cement to 16920.0 ft Circulated at 16920.0 ft Drilled cement to 16971.0 ft Cleared Mud shakers Drilled to 16978.0 ft Circulated at 16978.0 ft Drilled to 16993.0 ft Circulated at 16993.0 ft Drilled to 17048.0 ft Cleared Mud shakers Drilled to 17049.0 ft Cleared Mud shakers Drilled to 17056.0 ft Circulated at 17056.0 ft Drilled to 17060.0 ft Drilled to 17163.0 ft (cont...) Drilled to 17293.0 ft (cont...) Progress Report Facility NK Main Pad Well NK-25 Rig POOL 7 Page 5 Date 15 December97 Date/Time 21 May 97 22 May 97 23 May-97 24 May 97 25 May 97 26 May 97 27 May 97 06:00-06:00 06:00-07:30 07:30-08:30 08:30-09:30 09:30-10:00 10:00-12:30 12:30-13:30 13:30-18:00 18:00-19:00 19:00-19:30 19:30-20:00 20:00-02:30 02:30-05:00 05:00-06:00 06:00-07:30 07:30-16:00 16:00-21:00 21:00-23:00 23:00-23:30 23:30-00:30 00:30-01:00 01:00-01:30 01:30-06:00 06:00-08:00 08:00-08:30 08:30-08:40 08:40-08:45 08:45-11:45 11:45-11:50 11:50-12:00 12:00-15:30 15:30-23:00 23:00-23:30 23:30-06:00 06:00-17:30 17:30-18:30 18:30-19:30 19:30-20:30 20:30-21:00 21:00-22:30 22:30-23:30 23:30-06:00 06:00-16:00 16:00-17:00 17:00-17:30 17:30-18:30 18:30-19:00 19:00-01:00 01:00-03:00 03:00-05:00 05:00-06:00 06:00-11:30 11:30-12:30 12:30-15:30 Duration 24 hr 1-1/2 hr lhr lhr 1/2 hr 2-1/2 hr lhr 4-1/2 hr lhr 1/2 hr 1/2 hr 6-1/2 hr 2-1/2 hr lhr 1-1/2 hr 8-1/2 hr 5hr 2hr 1/2 hr lhr 1/2 hr 1/2 hr 4-1/2 hr 2hr 1/2 hr 0hr 0hr 3hr 0hr 0hr 3-1/2 hr 7-1/2 hr 1/2hr 6-1/2 hr 11-1/2 hr lhr lhr lhr 1/2hr 1-1/2 hr lhr 6-1/2 hr 10hr lhr 1/2 hr lhr 1/2 hr 6hr 2hr 2hr lhr 5-1/2 hr lhr 3hr Activity Drilled to 17401.0 ft (cont...) Drilled to 17401.0 ft (cont...) Circulated at 17401.0 ft Pulled out of hole to 16940.0 fl R.I.H. to 17401.0 ft Circulated at 17401.0 ft Pulled out of hole to 16940.0 ft Pulled out of hole to 10000.0 ft Serviced Block line Serviced Top drive Held safety meeting Pulled out of hole to 400.0 ft Pulled BHA Made up BHA no. 8 Made up BHA no. 8 (cont...) R.I.H. to 16971.0 ft Reamed to 17401.0 ft Drilled to 17413.0 ft Circulated at 17401.0 ft Pulled out of hole to 16971.0 ft Serviced Block line Serviced Top drive Pulled out of hole to 5500.0 ft Pulled out of hole to 350.0 ft (cont...) Pulled BHA Retrieved Wear bushing Installed BOP test plug assembly Tested All functions Retrieved BOP test plug assembly Installed Wear bushing Made up BHA no. 9 R.I.H. to 17350.0 ft Reamed to 17413.0 ft Drilled to 17485.0 ft Drilled to 17583.0 ft (cont...) Circulated at 17583.0 ft Pulled out of hole to 16970.0 ft Rest hole at 16970.0 ft R.I.H. to 17583.0 ft Drilled to 17588.0 ft Cleared Mud shakers Drilled to 17616.0 ft Drilled to 17629.0 ft (cont...) Circulated at 17629.0 ft Rest hole at 17629.0 ft Pulled out of hole to 16971.0 ft Flow check Pulled out of hole to 385.0 ft Pulled BHA Made up BHA no. 10 R.I.H. to 4000.0 ft R.I.H. to 16970.0 ft (cont...) Serviced Block line Repaired Top drive Facility NK Main Pad Progress Report Well NK-25 Rig POOL 7 Page Date 6 15 December 97 Date/Time 28 May 97 29 May 97 30 May 97 31 May 97 01 Jun 97 02 Jun 97 03 Jun 97 04 Jun 97 15:30-16:30 16:30-06:00 06:00-12:30 12:30-13:30 13:30-14:30 14:30-15:30 15:30-18:00 18:00-18:30 18:30-19:00 19:00-06:00 06:00-11:30 11:30-13:30 13:30-14:00 14:00-23:00 23:00-00:00 00:00-03:00 03:00-05:30 05:30-06:00 06:00-08:30 08:30-10:00 10:00-17:00 17:00-19:00 19:00-06:00 06:00-22:00 22:00-00:00 00:00-01:30 01:30-02:00 02:00-04:00 04:00-06:00 06:00-08:30 08:30-10:30 10:30-11:30 11:30-16:00 16:00-18:30 18:30-19:30 19:30-23:00 23:00-00:00 00:00-00:30 00:30-01:30 01:30-06:00 06:00-08:00 08:00-09:00 09:00-11:30 11:30-15:00 15:00-15:30 15:30-16:00 16:00-18:30 18:30-02:30 02:30-04:30 04:30-05:30 05:30-06:00 06:00-12:00 12:00-04:00 04:00-05:00 Duration lhr 13-1/2 hr 6-1/2 hr lhr lhr lhr 2-1/2 hr 1/2 hr 1/2 hr llhr 5-1/2 hr 2hr 1/2 hr 9hr lhr 3hr 2-1/2 hr 1/2 hr 2-1/2 hr 1-1/2 hr 7hr 2hr llhr 16hr 2hr 1-1/2 hr 1/2hr 2hr 2hr 2-1/2 hr 2hr lhr 4-1/2 hr 2-1/2 hr lhr 3-1/2 hr lhr 1/2 hr lhr 4-1/2 hr 2hr lhr 2-1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 8hr 2hr lhr 1/2 hr 6hr 16hr lhr Activity R.I.H. to 17629.0 ft Drilled to 17671.0 ft Drilled to 17687.0 ft (cont...) Rest hole at 17687.0 ft Drilled to 17693.0 ft Circulated at 17693.0 ft Pulled out of hole to 16971.0 ft Serviced Top drive R.I.H. to 17693.0 ft Drilled to 17771.0 ft Drilled to 17795.0 ft (cont...) Circulated at 17795.0 ft Rest hole at 17795.0 ft Pulled out of hole to 232.0 ft Pulled BHA Tested Well control Made up BHA no. 11 R.I.H. to 1000.0 ft R.I.H. to 5741.0 ft (cont...) Circulated at 5741.0 ft R.I.H. to 17745.0 ft Circulated at 17745.0 ft Drilled to 17927.0 ft Drilled to 18110.0 ft (cont...) Circulated at 18110.0 ft Pumped out of hole to 16880.0 ft R.I.H. to 18110.0 ft Circulated at 18110.0 ft Pumped out of hole to 16000.0 ft Pumped out of hole to 14800.0 ft (cont...) Pulled out of hole to 11980.0 ft Rest hole at 11980.0 ft Pulled out of hole to 200.0 ft Pulled BHA Rigged up Wireline units Conducted electric cable operations Rigged down Logging/braided cable equipment Serviced Top drive Rigged up Wireline units R.I.H. to 11750.0 ft R.I.H. to 16766.0 ft (cont...) Serviced Block line Repaired Brake Circulated closed in well at 16766.0 ft Circulated at 16766.0 ft Rigged up Handling equipment Conducted electric cable operations Conducted electric cable operations Rigged down Logging/braided cable equipment Ran Drillpipe in stands to 18080.0 ft Circulated at 18080.0 ft Circulated at 18080.0 ft (cont...) Pulled out of hole to 6400.0 ft Circulated at 6400.0 ft Progress Report Facility NK Main Pad Well NK-25 Rig POOL 7 Page 7 Date 15 December 97 Date/Time 05:00-06:00 06:00-09:30 09:30-10:00 10:00-10:30 10:30-12:30 12:30-13:00 13:00-17:00 17:00-19:00 19:00-04:30 05 Jun 97 04:30-05:00 05:00-06:00 06:00-16:00 16:00-19:00 19:00-19:45 19:45-22:00 22:00-22:30 22:30-23:00 23:00-00:00 06 Jun 97 00:00-00:30 00:30-06:00 06:00-08:00 08:00-08:30 08:30-14:00 14:00-20:00 20:00-21:30 21:30-22:00 22:00-00:30 07 Jun 97 00:30-03:00 03:00-03:30 03:30-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-10:30 10:30-11:00 11:00-11:30 11:30-17:00 17:00-18:00 18:00-20:30 20:30-21:00 21:00-03:30 08 Jun 97 03:30-04:30 04:30-05:00 05:00-06:00 06:00-08:00 08:00-08:30 08:30-16:00 16:00-18:00 18:00-19:00 19:00-19:30 19:30-23:00 23:00-00:00 09 Jun 97 00:00-01:30 01:30-02:00 Duration lhr 3-1/2 hr 1/2 hr 1/2 hr 2hr 1/2 hr 4hr 2hr 9-1/2 hr 1/2 hr lhr 10hr 3hr 3/4 hr 2-1/4 hr 1/2 hr 1/2 hr lhr 1/2 hr 5-1/2 hr 2hr 1/2 hr 5-1/2 hr 6hr 1-1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr lhr 2-1/2 hr 1/2 hr 1/2 hr 5-1/2 hr lhr 2-1/2 hr 1/2 hr 6-1/2 hr lhr 1/2 hr lhr 2hr 1/2 hr 7-1/2 hr 2hr lhr 1/2 hr 3-1/2 hr lhr 1-1/2 hr 1/2 hr Activity Pulled out of hole to 5400.0 ft Pulled out of hole to 80.0 ft (cont...) Rigged down Logging/braided cable equipment Serviced Drillfloor / Derrick Rigged up Casing handling equipment Held safety meeting Ran Liner to 1363.0 ft (7in OD) Installed Liner hanger Ran Drillpipe in stands to 16970.0 ft Rigged up Handling equipment Ran Drillpipe in stands to 17900.0 ft Ran Drillpipe in stands to 17900.0 ft (cont...) Circulated at 18110.0 ft Mixed and pumped slurry - 53.000 bbl Displaced slurry - 410.000 bbl Rigged down Handling equipment Pulled Drillpipe in stands to 15780.0 ft Rigged down Handling equipment Serviced Block line Pulled Drillpipe in stands to 3600.0 ft Pulled Drillpipe in stands to 3600.0 ft (cont...) Retrieved Setting tools Tested Well control Repaired HCR valve Tested Well control Made up BHA no. 11 Rig waited · Equipment R.I.H. to 4000.0 ft Circulated at 4000.0 ft R.I.H. to 10850.0 ft R.I.H. to 12000.0 ft (cont...) Circulated at 12000.0 ft R.I.H. to 14550.0 ft Cleared Flowline Serviced Brake R.I.H. to 16722.0 ft Circulated at 16722.0 ft Tested Liner Laid down 1896.0 ft of 5-1/2in OD drill pipe Held safety meeting Pulled out of hole to 202.0 ft Pulled BHA Rigged up Drillstring handling equipment Made up BHA no. 12 Made up BHA no. 12 (cont...) Rigged up Drillstring handling equipment R.I.H. to 18020.0 ft Circulated at 18020.0 ft Serviced Fluid system Held safety meeting Circulated at 18020.0 ft Serviced Fluid system Pulled out of hole to 16721.0 ft Serviced Block line Progress Report Facility NK Main Pad Well NK-25 Rig POOL 7 Page 8 Date 15 December97 Date/Time 02:00-02:30 02:30-03:30 03:30-04:00 04:00-06:00 06:00-08:30 08:30-17:00 17:00-17:30 17:30-18:00 18:00-19:00 19:00-20:00 20:00-06:00 10 Jun 97 06:00-06:30 06:30-07:00 07:00-07:30 07:30-08:30 08:30-16:00 16:00-17:30 17:30-18:30 18:30 11 Jun 97 06:00-09:30 09:30-11:00 11:00-11:30 11:30-13:00 13:00 12 Jun 97 06:00-09:00 09:00-10:00 10:00-10:15 10:15-10:30 10:30-10:45 10:45-11:00 11:00-17:00 17:00-18:30 18:30-20:00 20:00-20:25 20:25-20:30 20:30-22:00 22:00-02:30 13 Jun 97 02:30 06:00-07:30 07:30-08:00 08:00-09:00 09:00-09:30 09:30-10:30 10:30-12:00 12:00-14:00 14:00 14 Jun 97 06:00-12:00 12:00 15 Jun 97 06:00-12:00 12:00 16 Jun 97 06:00 17 Jun 97 06:00 18 Jun 97 06:00 19 Jun 97 06:00 Duration 1/2hr lhr 1/2hr 2hr 2-1/2 hr 8-1/2 hr 1/2 hr 1/2 hr lhr lhr 10hr 1/2 hr 1/2 hr 1/2 hr lhr 7-1/2 hr 1-1/2 hr lhr 3-1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 3hr lhr 1/4hr 1/4 hr 1/4 hr 1/4 hr 6hr 1-1/2 hr 1-1/2 hr 1/4 hr 0hr 1-1/2 hr 4-1/2 hr 1-1/2 hr 1/2 hr lhr 1/2 hr lhr 1-1/2 hr 2hr 6hr 6hr Activity Serviced Fluid system R.I.H. to 18020.0 ft Serviced Fluid system Circulated at 18020.0 ft Circulated at 18020.0 ft Pulled out of hole to 1270.0 ft Rigged up Drillstring handling equipment Pulled out of hole to 370.0 ft Pulled BHA Rigged up Logging/braided cable equipment Conducted electric cable operations Rigged down Logging/braided cable equipment Rigged up Completion string handling equipment Installed Hydraulic packer Ran Drillpipe in stands to 650.0 ft Ran Drillpipe in stands to 17300.0 ft Functioned Hydraulic packer Rigged up Drillstring handling equipment Laid down 13800.0 ft of 5-1/2in OD drill pipe Laid down 13800.0 ft of 5-1/2in OD drill pipe (cont...) Laid down 700.0 ft of 3-1/2in OD drill pipe Removed Wear bushing Rigged up Completion string handling equipment Ran Tubing to 4-1/2in (15000.0 ft OD) Ran Tubing to 16881.0 ft (4-1/2in OD) (cont...) Installed Tubing hanger Installed SCSSSV control line Tested SCSSSV control line Ran Tubing on landing string to 16881.0 ft Serviced Tubing hanger Reverse circulated at 16881.0 ft Functioned Production packer Set packer at 16810.0 ft with 3500.0 psi Tested Tubing - Via string Tested Permanent packer - Via annulus Installed VR plug Removed BOP stack Installed Xmas tree Installed Xmas tree (cont...) Tested Xmas tree Retrieved VR plug Installed High pressure lines Tested Permanent packer - Via annulus Circulated at 5339.0 ft Installed VR plug Rigged down Top drive Rigged down Top drive (cont...) Rigged up Top drive Rigged up Top drive (cont...) Rigged up Draw works Rigged up Draw works (cont...) Rigged up Draw works (cont...) Rigged up Draw works (cont...) Rigged up Draw works (cont...) Progress Report Facility NK Main Pad Well NK-25 Rig POOL 7 Page 9 Date 15 December 97 Date/Time 20 Jun 97 06:00 21 Jun 97 06:00 22 Jun 97 06:00 23 Jun 97 06:00 24 Jun 97 06:00 25 Jun 97 06:00-16:00 Duration 10hr Activity Rigged up Draw works (cont...) Rigged up Draw works (cont...) Rigged up Draw works (cont...) Rigged up Draw works (cont...) Rigged up Draw works (cont...) Rigged up Draw works (cont...) ;1Z-i~-D7 ;1O:O4~ ; ,at{gO FBOC~ DO7 684 81D8;# D/lO Date 7/27/97 SSSV Pulled N/A Recoverable Die=el 15 BBLS - FTP/ITP SSSV Information !Description Well Work Log ,/ t( ACID ROPE PERI:/FOAM ACID FRAC'U S$$V Pulled Ser, No. SSSV Ran N/A N/A Non*Recov. Diesel Carrier Ran" N/A 9 6/8" PS! 1;3 3/8" PSi ~ 100 psi 10,,,psi FRAC SLV IN HOLE(2.75" ID) :SaSV Ran Sar. No N/A ;Carrier Sar. No~ N/A L6-25 Tbg/TT Sizes 4 1/2" ,, SSSV Nipple 4.5 TRSV OT 10 Min. Rest./ Depth 10 psi 3.725"@12,816' Tubular or Casing Problems NrA Cost e~tlm;t~ #1 " ROPE/N2/ACID. $6,87.,4.00 v" AFE No, 2B0201 Time 12:0~)' ' 18:30 19:00 22:;~2 01:20 02:00 02:15 02:30' ,, _ -03:b6 , 05:05 07:00 Cost Estimate #2 ACID/FOAM/FRAC _. $6,87.4.00 Cc #~z. bSz../7O J-/ sTART MOVING 1N EQUIP, CALL OUT FOR CRANE I RIG HD UNES FOR ROPE-PERF / R!GUP s.WS/DOWELL' HELD SAFETY MEETING WITH RIG, AND ALL PERSONNEL Cost Estimate #4 $29,1 14.40 · A~tivity m Cost Estimate #5 Tagged PBTD NT ,, Signed 11'15 1 1:30 10:50 WHP=4250 PSI, IA--1750 PSI, 2 EIPM KCL, 7600 SCFM N2, 85 MCF N2 AWAY 11:05 10:40 ;RU FRAC EQUIP 10:00 !HELD SAFETY MEETING W/FRAC CREW-RIG CREW- AND PRESONNEL 10:35 f PT TO 8300 PSI IOPEN WELL. WHP=3685 PSI. BRING IA PRE'S TO 1500 FROM 1000 PSi ' ~START FLUIDS DOWNHOLE. 2 BPM OF 2% KCL., 7600~ SCFM N2 (75 QU. AL FOAM} WHP=3800 PSI, IA = 1600 PSI 50 BBL KCL AWAY~ WHP--4100 PSI, IA-1860, 7600. SCFM, 19.5 MCF N2 AWAYr 2 BPM SWITCH TO 15% HOL ACID 25 BBL ACID AWAY, 2.! BPM, 76.00 SCFM, 270 MC.I= N2 AWAY, WHP--3950, IA--.1900 50 BBL ACID AWAY~ 2.0 BPM, 7600 SC. FM, 37,..0 MCF N2 AWAY, WHP--4080, IA=1900 SWITCH TO NITRIFIED KCL OVERFLUSH Page No. of · . .MARK SANT ...... I CCH (WHP PRES = 3800 PSI) LO(?.KS LIK.E 5' O.F. CABLE HAD SMALL KINKS IN tT (.NOTE DIDN'T RELEASE RD SWS AND P~K ;]~,O_~, , I WHP = 8500 9000 SCFM, 609 MCF N2 AWAY, IA = 3000 PSI SHOOT 17526-1754 6 REF 7/12/97 GR/CCL LOG 4SPF. 1.80°'PHASING. WHP BLED'~UICKi~.Y T~)].4200 PSI." P0H (BLED IA. TO 1000 PSI) AT 2052' HAD T© PUT 5600 PSI ON coNT'. LINb TO GET THRouGH sssV, POOH ESTABLISHED RADIO SILENCE ON PAD / PT 4500 PSI/BLEED LUBRICATOR TO 500 # RIH W/CCL~'~UN H~_D, R&LI_ER__', PER. F GUN, ROLLER, GUN BODY, FOR ZiI. GA~UGES, ROLLER STEM GUNS:~NCH~.~SPF~ 180 DEGREE PHAS.!NG, DEEP PENETRATORS, NO .O. RIENTATION ' R~II~! TIC:IN LOG O'-N--'DEPTH 17650 PULLII~G 3,500# M~X FELL'OFF TO ,=,~',i50# - LOG ON DEPTH, PARK CCL @17521' TOP SHOT,.@ 17,526' .. .. COME OH LINE W/N2 SET TREE SAVER 1000 PSI ON WELL HEAD BROUGHT IA UP TO 2500 PSI / WHP -- 4300 PSI (390 MCI5 N2, ~000 SCFM) WHP - 66..00, 9000 SCFM, 500 MOF N2 AWAY, IA = 2800 PSI 5NN'I' BY:I~IE55AfiE CP_XN'I'ER ;12-16-~7 ;lO:05A~ ; ARCO PROC" ~07 864 81B8;#10/IO Well Work Log 7/2.7./97. _ .. .ACID ROPE PERF/FOAM ACID FRAC 6-25 Time Lo9 E. ntry 11::~5,: 'iNCREASE RATE TO !..5. BPM, 500 SCF/B,_ N2; WHP=5275"~;SI IA=2570'PSI 11:45 200 BBL KGL A_._WA~Y, 15 BPM, WHP.~4500 PSI, IA=2_50.0 PSI, 47.4 M__CF N2 AWAY. CUT N2, PUMP STRAIGHT ECL WATER. 1 1:55 138 EEL ECL A...W.~', 10 BPM, W.H'P=3000 PSI,.i_A--I~500 PSI !SWITCH TO CRIJDE OVERFLUSH 1 1:57 12 BPM- 3150 P i': 31 EELS AW'AY ........... 12-1 5 275 BEE DEAD ~RuDE AWA¥~'~5 BpM, WHP=2..500 PSI, IA ='139~'P-~i ..' SD. MONITOR PRES. PUMP 15 BBLS DIESEL RDMO (LEFT 2000 WHP- 500 IA PSI)_. . ~UII/IMARY: PER~RMF_.~ ACI.D..ROP~ ~'EFIF & FOAMED ACID-FRAC ........... OF ALAPAH B ZONE. WELL HAD 25'EELS 15% HCL IN LINER. TIED INTO"~WS GR/CGL 7112/97. PULLED 350Off IN LINER hUE Td LINE DRAG -' TOOL STRING WAS 52.5' LONG: 20' GUNS, 10' Z-I GAGE CARRIER, ELINE & SLICKLINE ROLLERS ' PRESURED WELL TO 8500 PSi WITH 610 MCF N2 SHOT 17526-46, 4 SP.F..?_180° PHASI.N.'G: .RANDOM'~RIENTATION, ' __ :RD SWS & PERFORM~ FO~ ACID JOB. .... pUMPED 50 BBL"~5 QUALITY FOAM 15% HCL AT'2 E~PM. 7600 SCFM N2 '" ' .... AVERAGE TRE.~TING PRES ~ PSI WHII~ PUMPING ACID CHASED ACID WiTH KCL ENERGIZED. ...W. /.500 SC~/B N2_ AT 15 GPM (5300 PSI TREA~' PRES) DISPi.~CED ~lJ ~RE W/DE~ CRUDE ROPEFLUIDS 610 MCF N2 " - ... ACID FRAC FLUIDS: - - · .. . .. _ .... .50 BBL 2% KCL W/'~'~5-M-C;F N2 +FOAMER ' 50-1~BL'15% HCL W/175 MCF N2+ F'OAMER 200 [tBL 2% KCL W/104 MCF N2+FOAMER ....... ..... 138 BBL 2% KCL ,, 275 BBL DF.AD CRUDE 15 BBL DIESEL , ...... 338 BEE KCL TO:I"~,L ...... _ ., .,, 474 MCF N2 TOTAL TOTAL N2 FOR ROPE + FRAC--i .08 MMS~F N2 ......... ,,, .... ,, ,, .- ,, , Signed I Pag; No. of . ..... ,2., ,,, ~1 rlY;~fli~Li~ G~NI'12~ ;I7.-IU-~'/ ;IU;UY./L~ ; AK(JO [°P;L)(Z~ OD7 0(~4 ~lOtl;~t 7/iU ~ . Well Work Log Date Description ~..~ ,/ 'DS-Well 10/13~07 ~ROPE PERF/FOAMED ACID STIMULATION 'o/- i!~ L6-25 ,,. 1,280 psi 400 psi 2.83 @ FSLV 4.5 TRSV SSSV Information' ' ' rTubular or Casing i:b'oblems PB'I'~' " ll- ::z.O cs,v 30 BELLS Time.· Log', Entry , 07:00 ~J~U DOWELL, SWS, ~5 TON CR..ANE, MAN.BASKET ,, 07:30 INSTALL 7~' TREESAVER, SPOT EQUIPMENT 08:00 RIG UP S~/S, 10K BOP'S, LUElE, AND GREASEHF_~- .... RIG UP LITTLE RED ON BACKSIDE, PRV SET ~ 3250 F~i - ...... · 1 1:45 8AFE'Fg ME~FING, SWS 3, LR 2, ARCO 2, DOW 6- 13 ,, j r' I ~ .'~ ,, 2.00 au , s r) ........ 12;30 PT SYSTEM W/LR @ 5000 PSI v ~ - 13:17 PRESS WELL W / N2 TO SET TREESAVER CUPS, GOODSET ~ 1300PSiWH , . ,. , . ! g':40 ,,PT DOW HL @ 9000 PSI (BLI~CKED _~_T_'T~__EE_! ............ RESUME CHARGING WEt.! @ 4000 ~;FD , , , 14:00 TIE-IN SWS 7-12-97, 3100# UP WEIGHT, 31~0# M~0( ...... WI' FELL TO 2000 W..ITH WH @ 3600; susPEcT SSS. y? CAN'T FALL WITH 4000 PSI WH; SHUT-OFF GR ,,F__~SE TO FALL,(,STOPPED N2_,CHARGING.). ........ .- 1 5:2 5 RI~SUME CHARGING w-~'l,~Li' IA PRESS 2650 ...... ...... _ ,~ . ,. ..... ,, 15:55 8500 PSI WH,..SD N2 PUMPS 1 6:00 SHOOT GUN (PAR,K. ED, DID NO:I' FE.,F~, UNE, [~lO NO, T, PULL WT~ .... 16:08 LOG COLLARS, POOHI.NTOLUBRICAT. OR,$1WELL ..... WHPRE~'S;350OP~I ~ 7:40 RIG DOWN ~S; RELE~E FRChM LOGATION WO DOWEL[. PUMPS AND N2 RECHARGE 21 00 CONT NEXT PAGE II I la . II . I.E. III II PResults Summa.r? - Address each objective list.ed in Job reque_,.st - e, t;I. spli,te;'EIOC piok, .,c~ annels, ,e.t¢, , .... NEXT PAGE ....... ,,, ..... ~ ! ,,, ii ii i iii i I IIII iii Perforatir~.l.,_nterval (BHCS,,depths} I Gun InfO, (in,an .'mom Iine~ a~. nec~sar~) Top (ft) "l~otl,o,,m SPF ,Grams/EHD/'I-?P, Pha~n-~l , Orient O/BIU Zone AdlRePeYf II P or IPROF: .Well rate (Mtach w.S,~) Sal-IPS _ Pump i,p Logs (LDL, PNL, et~_.)_ BOpD; F/rFP: "' I~D: 8500 PSI OVERBALANCE W / N2 Tot, Gas: BWPD: WC (%): press: aa:' Chok ......... GL G e o.. Temp: I I all ii_ i I I i i ~ ~1 I Well Work Log 10/13/07 .. ! . ROPE. PEFIF/FO..A~I..EDACIDSTIM. pLATION · , .... J L6-25, Time log ,.F. Ttltry 21'.:30 PT EL v~iTH DIESEL, FROI~I LR (HEA,T..E.D) e 8500'PSI IA PRE.S,S 2500 I~SI 7.22:o0 [,UM~.. ~^r~, 2% XCL, ~_ m Ou^[rr~, 5o BB~.S, ~-2 BPM, a~00-,,00 ~;$~ .... 22:35 PUMP ACID, 75 N2 QUALITY, 15% HCL. 60 BBLS, 1.6 BPM' 4060-4000 PS1 2s:os .. PUMP oV~.m~_Us,, ~ KCL tOO ~e~ m...~00 ~[S....!a.~ ~U, ~$00-~5oo ~S~ 23:20 PUMP SPACER. 2% KC[., 04 BBLS, 15 BPM, 4700 PSt 2800 IA PRESS,, 23:28 'CRUDE DISPLAOE.'i~ENT, 275 BBLS, 8-15 BPM, 3200-fii00 PSI ' 23:48 SHUT DOWN PUMPS · ,.-, ~ ,,. 00:05 PUMP DIESEL DH TO cLEAN PUMPS AND UNES .... .. - · , . SHUq- IN WELJ~ RIG DOWN · .. . 02:00. RL~.E~E WEll TO PRODU~I'ION FI.OWit~K PUMPED PAD: 50 BBLS 2% KCL W/75 QUALITY N2 ., ,. ~ 50 BBLS 15% HCL W/75 QUALITY N2 200 BBLS 2% KCL W/500 scF/BBL N2 , , , ~ · , ,, ~4 BBI.$ KCk -. ,. _ ,., , ,. ,~ 975 BBLS CRUDE 30 BBLS DIESEL MAX' RATE 15 BPM, MAX PREsSURE 6500# P01~PED 600K ~CF N2 ON ROPE, 4641~ N2 ~DN FOAMED ACID= 1064K SCF N2 ,.. 1,, _ ., .. , ,,-- ,. · , , ,, , _. , , ,, , -. . . ,, , ., . Signed e No. of ~nl Bi:ffJri~BU~ ULDI'I'~ ;12-1~-D7 ;1O:Ol~l ; ARCO FBOC~... BO7 864 81B8;# 6/10 Well Work Log_ Date De~dpllon i~/"G ~) OS'Well - ~V Pulled ~V Pulled Ser. N~. ' ~V ~n ~V ~covemffio Dl~el N~-Rec°v. Di~el - ~r~r ~ C~rfl~r ~r. ~o. ~V Nipple HES SERIES lO _ 2,~ psi . 220 psi ~ psi .~ ~ 3~72~ ~ 17315 ~ Ink--ion ~ular °r ~ing P~blems PERF ' $2,574~ ~201 N~SL 17DH NT ..... ~ - .... 10:~ ~CHKI~ I~L~ 11'10 TIE IN TO GR~CCL 7112~7 ..... ~ 11:~ LOPEN WELL TO ~S~M ~P=~ 12:}~ ~~1, LOGUP3CO~S. -15~5 ~OPEN WELL TO 5Y~ ~=~ PSI 16:~ LOG INTO POSffiON. SH~T GUN2:172~-17224 AT ~pF ....... i7:ffi OOM, ~F. fa:J6 .~ INTO F~G AT 17~.' CORRECT +2d'. '- - ~ 6:40 OPEN ~LL TO ~EM ~P~ - ~0:4~ LO~ INTO POSITION. ~TGUN3: 171~17~AT6~F ....... '- ~~ PS1 LOG UP 3 CO~RS. SI ~LL POOH t 9:~5 OOH. ASF, ~ ]:~ nE I~o ~G AT ] 7~. CORRE~ 21:~ ~PEN ~ TO S~EM ~0 22:m LO~ ImO POSEION, ~OOT G~N 4:' 17~-17~ AT ~F ....... SUMMa: -'~Eh ~U~ RU~, A~ ~UNS LO~D AT ~bF, m DEG P~mG. IN~$ S~OT WERE: -- - ~ =, -. RUN 1 1~1~172~ .. - NO~: SHOT I~A~ ~CE TO ~ 12 SPF. ~E~E ~ SOME F~TAGE AT ~PF ' - . ~i~ed BRO~ J~ge No. of 1 1 ,,, - .... ;IZ-Ib-D'I ;IU;UUA~ ; ..z~UO ff~OU* EL Well Work Log Date Descril~n~' ' .... DS.Well .......... 11/14/07 , ( 3 3/8)PERF P-TPtlTP PSI IA ~1~ ~ ~---~ ~ PSI ]$~ ]Mln ID SSSV nipple 470 psi 2,260 psi _ ..~_0_P~iJ 5~0 psi ] 3.81"~ 7988' 4.5 HES TRS~V SSS~ Info,etlon Tu~r or ~sing Problems T SSSV NO ........ SW S .... ....... ., ~me Log En~ 08:3~ MIRU S~ ~93, E~ORE, P~'30O~, ~F~ MTG. WELL I~1%~ GR~V~- ., ~_ a lO:00 .; RIH W/CCL, 3.~0" ROLLER, 9' x 3 ~" GUN, IO'X 3 ~8'TGUN. S~TCHE~. ~p~ .. **' ~-~ CCL-TSIGUN 1(10' GUN ON BO~=17.3', CCL-TSIGUN 2 (g' GuN ON TOP)=6.~- .... CCL TO BOSOM OF GUN STRING=28.7'. O~~ LENG~=32.2'. ........ ,, 12:10 rOPEN WE~ AT GRO~, TIE-IN TO S~ GR LOG DATED t2 JUL 19g7 ............ ~ ..... ,, ,,= 12:20 SHOOT GUN ~ ~ 17173'-171~'. RE-TIE IN. 12:25 "'SHOOT GUN 2 ~ 17152'-17161'. SI WEL~ POOH. 13:30 PU~ED ~ ~ 120'. CLOSED BOPS. ~NK !N ~RE AT FLOWTUB~'~ED KINK, DIDN~ APP~R TOO BAD. RE'TAB LUBRICATOR, OPEN BOP'S. WORK LINE UP THROUGH FLOW TUBES. ~bLLED O~ OF WK POI~ AT H~D W~I~-W~NG LINE THROUGH " ~-~ TUBES. O~M~ER AT 114,5', APPles'WI LIG~ W~K PoI~ (~12~) FOR DEEP HO~, GUN WAS ~OUNCE~ OFF. ~ TENSION AT SURFACE ~ILE PULLING UP WAS 60~7~. . . 15:00 RDMO .~. ,, .,,, _ . . , , ,,~, "'SPEC~ NO~'~ FISH I~'HO~ IS 2 ~iTCHED GUNS. NO ~SU~ coNFI~ATION T~T GUNS SHOTII - FISHING C~ MUST ~SUME ~E ~U~RE "~". A~ PERFO~TING SAFETY PRECAU~ON~ TO BE O~ER~Dlll . '~'4:00 11115/97: GUN sUccESSFULLY FISHED, BOTH GUNS...ALLSHOTS FtRED. -, , ..... ~.. Resu~ S?~a~ -'Addm~ each obM~ II~d ~b_~quest - e. g. spic, GOC pick, .... ,.,. .,-, ...... . · .~. , ,, --~.~ ,,. ,.m .... ,,,~ .......... ,,.. .,, . ....... ~ ,. . , i illl _J I . I~ ii ~ m P~om~ ~~ {~~).i Gun ~m ~ ~m ii~ as ~~) ...... · ................. Top'(fl) Bo~om SPF Gm~D~P 'Phasing Ode~t O~ .... ~ne _ .... 17173. 171B3 12 20. U.4~1.~ ........ 60 ~N~N U C ~D 17152 17161 '-' 12 20.U,40~1.90 60 ~~ U C ADD , ,., ~PD: -. FR~ . .' ........ M~ '~ff Note fluid pump~ and bbls ~hind B~D: WC (%):1 ~ss; pa~ made ~ . , GL Gas: ~C~ke *;~ _,. T~p~. -'~ "' · ...... ' · '", · -- ~ ,_ -'- ~ ' --- ' - - ~'~, .... " Data De~criptlon.~:~¢,.~h.~.~..rl;. %_¢,~.~..~,,~:~:¢,~.-.,¢dt,~r~,.~,~,~ju ;,;',';..:!.:.!~;?,;. DS-Well .'.,..,' .:. ...... ,.. ,,,-,,,.~: - .:' :',' ." : ..,-.~-.-4. ~,_--....~.-. ...... :-,.~.',.;-=,,:,".'...'· · .,., :': ".'¢~,:;.',~'~"..'..:~.~,~..- 11 ...:.~.¢'-. :": .... ..3318 PERF~ ...... :.:'"~'"'~.': '"":": '?" '" "L6,-25 ........ : ...... ." ' ' ' .... :... ", '. . . ~ ~. ....p.,~,. ~ ................ , - ~ ~..,.:,,,~ ,/!. · . . ....,-, ,..'.;.,.. *.... *... ~ ...,-. · ~...,:. ,.. , . ',. ..'~¢~:' '~.~ ";; ."~' ............. " SENT BY:MESSAGE CENTER 807 564 51~3;g 3/10 ;12-16-97 ; 9:58AL~1 ; ARCO PBOC~ .-_ El. Well Work Log Da{a De$orIptton _ DS.Well 11115,97 p_Sl~_ _~ 3 3/8 PERF L6~25 ~:'FP~ITP '~SI IA OA PSI ISITP [MIn ID SSSV nipple 470 psi 2,260 psi 220 psi[ 520 psi[ 3.81" O 798B' .. .. 4.SHESTRSSSV SSSV Information Tubular or Casing Problems PBI'D HES '[T:TSSSV .. NO TAG svvs $~,o~~ ~1 ~ .~~5 BBLS ~ 3B0201 NLDSL!70H' ~ g ~tme J Log EnIw ..,., .... ~5.[~. Mi~S 8~93, ELMORE, PT ~, SAF~ ~G. WELL IS SI AT GROVE. .. 16:45 RIH W/COL, 3.680" ROLLER, 9' x 3 ~8~ GUN, 10' X 3 ~8" GUN. SW~CHED. 6 SPF. .... '" COL-TS/GUN 1(10' GUN ON ~=17,3', COL-TS/GUN 2 (9' GUN ON TOP)=6,3' "' COL TO Bo~OM~F GUN ~'1~-~=28.~, OVE~ ~GTH~'. ' ........... 1~:5o TIE-IN TO sWS GR LOG DATED 12JUL 1997 ............. 19:05 SHOOTGUN 10 17173',17ia3'. R;.TIE IN. ~ .... 19:15 SHOOT GUN 2 ~ 17152'-17161'. POOH, 21:30 AT SURFACE. ~UND HIGH ~R 1~' ~ H~. C~ LINE ~D REH~. ' ....... ~. ... '" UPPER GUN (~) DID~ FIRE 'LSW~R GUN B~T DEVOID SWffCH. --- "' '" - ' ' ' WILL RERUN ~ ~T ~IP. · 2~:45 TIE-IN TO SWS GRL~ DATED 12JUL 1997 . .., ,. ...... ,, . 23:55 SHOOT GUN ~ 171~'-17152'. POOH, · · .. '. . ,. :,.;.z..,= -, .. ,.. .... -,, .. 02;00 RIH W~OCL 3.~80" ROL~R, 9' X 9~ ~; GuN, 8,~89" RO~ERS, 6 SPF, -" .. 03:30 TIE-IN TO SWS GR LOG DATED 12 JUL lgg7 .. ~... ......... , ,,.., ,, ,~,,,, ..... 03:45 SHOOT GUN ~ 17152'-17161' POOH. 05:15 RIH W/COL, 3,680" ROLLER, 20' x 3 ~8" GUN, 3,680' ROLLERS. ~"SPF, ' ........ ............................ 06:20 TIE-IN TO SW8 ~R LeO DASD 12 JUL 1997 ~6:35 SHOOT GUN ~ 17132'-17152', POOH, 06:50 PULL 2S0~ OVER AT 16780', GUN H~ING UP IN X NIPPLE AT 16800', ..... ...... ....... 07:00 CALL O~ PUMP ~UCK TO Pi ~ GUN TO ~Y ~D ~EE ~ MO~NG ~. .................... i ,,,,, 10:00 BEGIN PI ~ .3 ~P~50 PS11NCR6~ING GR~UA~Y TO 2,9 BP~8~ (,5 BPM INCREME~S) '" ~ED AT ~CH ~ T~ ~H'W~ SUCCE~ ............ . ..... ~ .... _ ..... ,~,.,, P...... ____ , . · v ,. ~..~-,....~.../...~... ........ , ......... , ....... , .... ,,... ............ .... , .... . ..~.. , ..~.; ............... '.: . ..:~. .......... ,,., ,.-..; ' · .: '_,-.'.~:'..'.-' '.~2' :::'~.::=;~2~:$Pe~omU~ln~i. (BH~dep~}~Gu'n;4~0n~~m~lln=~'~n~;~'d~:a,~}. ~.~ ... L -, .......... , ....... ' Top (ft) Bottom ~ Grams~HD~ P~ing Orient O/B/U ~ne ~. .,Ad/Repel.. ".' '17173 17183 12 20.~/,40/21,90 O0 ~~ U ~.. 171~2 17161 .' .... 12 20,5/,40/21,g0 60 ~ U C" '.,'.-.'?'ADD...'-.:.. i i i I ............. ~ {~ BOPD: ~ -~~.. .' ... MD: .', Note Iluld pumped and b~s behind' ... .. Tot, Gas;, .~~~~"" ~ ~:1 '-" P~e in~leg e~"'~lon' na~t to each B~ .~ ~ ~~(~)~. Pm~ " ~a~ made'?:~;:'', .~' ' ..... ,-'n,::;.-::;,,:~.;~.V~t~- O~s; ~ ~ ~ ~' ':. Oho~ ~; .... Temp~ .......... ~w'::'; ,;~r,..:.,~,,: .~..?..,~ ...... ~11 i Iii iii i Slgne~~ · ' ........ '::? ....... ="~ ....... ' ............ .,;-' .......... .'~:'~" ~"¥',' ~ ' . : .. ,. ..... . .:..:,..;.~ ..,..,...:~ :..~., ...... Page No,; -of .,; ',: ~.~:' ~, ~~~~~~ ....... "'"?" ~ -"¢ .... * ........... "' :'~":'"'~ ~;~:':~"~:~:~;'"~)A~1 t~"~&.~ ~-~'.:,,~ Time Log Entry 11 :~.5 SD PUMP. TOTAL DIESEL AWAY--85 BBL. 11:30 PULLED....u.p HOLE TO 26~ 3 ~MES~F~_yZPg_~q~ ., 11:4 0 ~C~ION ~E ~ PU~ ~ ~S OR ~ O~ OF W~OI~. 11:41 PULED UP HO~ IN 2~ INC~ME~S...BROKE WKPOI~ aT ~7~(1 ~:~"WKPOIN~ ,, "' . 11;45 ,~. 13:30 ~. ..... ..... - .... . .... .,, .......... .,, ._- ............ , ..... ,,, , ,,~ ......... ~ ~ .~. ,,., , . .... ................ _ _ - ........ .__. ~__ ............ . .,,, _._ ,, : _ ~ ,,, , . ........... ..... , ....... , · ..... . .... ,. ,, ..... ... ...................... .._ .... · ,, · ....... ................ .......................... , ,,,., . ......... .... .~, - ,.~ .......... - .... I ....... , . . , . , .............. ...... , .... ., . . ........ .... . ........... .., .... ................ _.,, ,, , .......... ...... ,, ,,,,,,, , , ........ ~ ..... . . . }..- .. Sifln~d ....... :., : .... ""-. · , . · · . .,. ~ "' '.':.'7~'.": .... ..~ .t~.... :, . . ;...~ .;.:. .. ..... .._:,,. .... ' _[": ........................ ...' ..~:.. *~:..: ;;.,~... ~ ~.. ~...~ ~ RECEIVED JU~!I ~S 1997 BPXA PDO t EC£1V D B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA Gyro CONTINUOUS Multishot Survey Inside CASING Survey date: JUNE 09, 1997 Job number :A0697GCE407 ORIGINAL CONTENTS JOB NUMBER :A0697GCE407 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 1 w QUALITY CONTROL EQUIPMENT AND CHRONOLOGICAL REPORT 1. DISCUSSION/, SURVEY CERTIFICATION :SHEET DISCUSSION JOB NUMBER' A0697GCE407 Tool 778 was run in WELL# NK-25 on SCHLUMBERGER 3/8" wireline inside CASING. The survey was run without problems. SURVEY CERTIFICATION SHEET JOB NUMBER' A0697GCE407 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the odginal data obtained at the welisite. Checked by :- ROB SHOUP OPERATIONS MANAGER 2. SURVEY DETAILS f SURVEY DETAILS JOB NUMBER · A0697GCE407 CLIENT' B.P. EXPLORATION RIG ' SCHLUMBERGER LOCATION · WELL' NIAKUK FIELD, ALASKA NK-25 LATITUDE' 70.333 N LONGITUDE: 148.2W SURVEY DATE · SURVEY TYPE · 09, JUNE 1997 GYRO MULTISHOT IN 9.625/7" CASING DEPTH REFERENCE' 60.1' MAX. SURVEY DEPTH · ROTARY ~ABLE ELEVATION 17900' SURVEY TIED ONTO · NA SURVEY INTERVAL · 0-17900' APl NUMBER' 050-029-22760 TARGET DIRECTION · 87.65 GRID CORRECTION ' CALCULATION METHOD' N/A MINIMUM CURVATURE SURVEYOR · TOM STODDARD 3. OUTRUN SURVEY LISTING A Gyrodat a Di rect ional Survey' for B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA ~b Number: A0697GCE407 in Date: 10-Jun-97 20:00:00, lrveyor: TOM STODDARD ~lculation Method: MINIMUM CURVATURE lrvey Latitude: 70.350000 deg. N lb-sea Correction from Vertical Reference: 60.1 ft. zimuth Correction: fro: Bearings are Relative to True North roposed Well Direction: 87.650 deg ertical Section Calculated from Well Head Location losure Calculated from Well Mead Location orizontal Coordinates Calculated from Local Horizontal Reference A Gyrodata ?. EXPLORATIO~ ~KUK FIELD, WELL NO. NK-25 {TH SLOPE, ALASKA ) Number: A0697GCE407 Direct i ona 1 Survey' Page ~SURED I N C L AZIMUTH VERTICAL EPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 99.0 .20 42.24 99.0 201.0 .27 139.41 201.0 300.0 .86 177.09 300.0 401.0 1.20 169.87 401.0 502.0 1.35 154.52 502.0 601.0 1.21 122.07 600.9 700.0 1.18 109.83 699.9 800.0 1.39 90.19 799.9 901.0 2.19 84.85 900.8 0.0 .1 .4 .6 .7 1.3 2.6 4.4 6.6 9.8 0.00 .20 .35 .67 .36 .37 .73 .26 .49 .81 0.0 0.0 .2 42.2 .4 79.1 1.0 145.1 2.8 162.9 5.0 162.4 7.0 155.5 8.7 146.9 10.3 137.7 12.5 126.5 0.00 N 0.00 E .13 N .12 E .08 N .40 E .84 S .59 E 2.64 S .81 E 4.75 S 1.51 E 6.36 S 2.90 E 7.26 S 4.74 E 7.61 S 6.91 E 7.44 S 10.06 E .001.0 2.28 82.25 1000.8 .100.0 2.30 81.93 1099.7 .200.0 2.25 81.76 1199.6 L301.0 2.46 82.05 1300.5 L401.0 3.53 84.tl 1400.4 13.6 17.6 21.5 25.7 30.9 .13 .03 .06 .21 1.08 15.6 116.7 19.0 109.9 22.6 105.1 26.4 101.6 31.4 98.6 7.00 S 13.94 E 6,46 S 17.86 E 5.89 S 21.79 E 5.31 S 25.90 E 4.69 S 31.09 E L501.0 4.12 83.93 1500.2 L600.0 5.21 82.76 1598.8 ~700.0 5.66 82.74 1698.4 ~801.0 6.48 82.25 1798.8 1900.0 8.35 84.85 1897.0 37.5 45.6 55.O 65.6 78.4 .59 1.11 .44 .82 1.92 37.9 96.1 45.8 93.8 55.1 91.9 65.7 90.4 78.4 89.3 4.00 S 37.72 E 3.06 S 45.72 E 1.86 S 55.12 E .46 S 65.70 E .93 N 78.39 E 2001.0 11.87 86.45 1996.4 2100.0 16.03 84.64 2092.5 2126.0 17.04 82.90 2117.4 2150.0 17.47 82.30 2140.3 2200.0 18.90 83.74 2187.8 96.1 119.9 127.3 134.4 149.9 3.49 4.23 4.31 1.95 3.00 96.1 88.7 119.9 88.0 127.3 87.8 134.4 87.5 150.0 87.0 2.24 N 96.07 E 4.14 N 119.85 E 4.95 N 127.21 E 5.87 N 134.27 E 7.76 N 149.76 E A Gyroda t a Dire ct ional Survey. EXPLORATION ~KUK FIELD, WELL NO. NK-25 {TH SLOPE, ALASKA Number: A0697GCE407 .~SURED EPTH feet I N C L AZIMUTH VERTICAL DEPTH deG. deGo. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deG. / feet deG. 100 ft. HORIZONTAL COORDINATES feet Page 250~. 0 300.0 350.0 400.0 450.0 500.0 .550.0 ~600.0 :650.0 1700.0 20.58 83.70 2234.9 22.28 83.51 2281.4 23.81 83.15 2327.4 25.24 83.14 2372.9 26.79 83.11 2417.8 28.36 82.66 2462.1 30.16 81.86 2505.8 31.66 81.57 2548.7 33.31 81.39 2590.8 34.78 81.50 2632.3 166.8 185.0 204.5 225.2 247.1 270.2 294.5 320.0 346.7 374.6 3.36 166.8 86.7 3.40 185.1 86.4 3.08 204.6 86.1 2.87 225.3 85.8 3.09 247.3 85.6 3.16 270.4 85.4 3.68 294.8 85.1 3.02 320.4 84.8 3.31 347.2 84.6 2.94 375.2 84.3 9.60 N 166.54 E 11.64 N 184.70 E 13.91 N 204.14 E 16.39 N 224.75 E 19.02 N 246.52 E 21.89 N 269.49 E 25.18 N 293.70 E 28.88 N 319.11 E 32.86 N 345.67 E 37.03 N 373.35 E ~750.0 ~800.0 ~850;0 ~900.0 ~950.0 3000.0 3050.0 3100.0 3150.0 3200.0 36.57 81.56 2672.9. 403.6 38.30 81.69 2712.6 433.8 39.29 81.86 2751.5 464.9 40.08 82.14 2790.0 496.7 40.97 82.59 28.28.0 529.1 42.24 83.28 2865.4 562.2 43.35 84.16 2902.1 596.1 44.22 84.67 2938.2 630.6 44.88 85.06 2973.8 665.6 46.07 85.34 3008.9 701.2 3.58 404.3 84.1 3.46 434.7 84.0 2.00 466.0 83.8 1.62 497.9 83.7 1.87 530.4 83.6 2.70 563.6 83.6 2.51 597.6 83.6 1.87 632.1 83.6 1.43 667.2 83.7 2.42 702.9 83.8 41.32 N 402.20 E 45.75 N 432.27 E 50.23 N 463.27 E 54.67 N 494.89 E 58.99 N 527.10 E 63.07 N 560.05 E 66.78 N 593.81 E 70.15 N 628.24 E 73.29 N 663.18 E 76.27 N 698.70 E 3250.0 3300.0 3350.0 3400.0 3450.0 47.77 85.52 3043.0 49.26 85.51 3076.2 50.28 85.26 3108.4 51.00 85.11 3140.2 51.56 85.06 3171.4 737.7 775.2 813.3 851.9 890.9 3.41 739.4 83.9 2.98 776.8 83.9 2.08 815.0 84.0 1.45 853.6 84.1 1.13 892.6 84.1 79.18 N 735.10 E 82.11 N 772.44 E 85.19 N 810.49 E 88.43 N 849.02 E 91.77 N 887.88 E A Gyro da t a i P. EXPLORATION AKUK FIELD, WELL NO. NK-25 RTH SLOPE, ALASKA b Number:. A0697GCE407 Direct i ona 1 iASURED I N C L AZIMUTH VERTICAL ~EPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 1500.0 52.34 85.00 3202.2 930.2 1550.0 53.41 84.'67 3232.4 970.0 1600.0 54.60 84.32 3261.8 1010.4 t650.0 55.79 84.13 3290.3 1051.4 ~700.0 57.41 84.12 3317.9 1093.1 3750.0 58.81 83.55 3344.3 1135.4 3800.0 60.31 83.03 3369.6 1178.4 3850.0 61.85 83.32 3393.8 1222.1 3900.0 62.84 84.06 3417.0 1266.2 3950.0 63.75 84.95 3439.5 1310.8 1.56 932.0 84.1 2.20 971.8 84.2 2.45 1012.3 84.2 2.40 1053.3 84.2 3.25 1095.1 84.2 2.96 1137.5 84.2 3.13 1180.6 84.1 3.13 1224.4 84.1 2.38 1268.7 84.1 2.42 1313.4 84.1 ~000.0 64.21 85.31 3461.4 1355.7 ~050.0 64.24 85.33 3483.1 1400.7 ~100.0 63.78 84.84 3505.0 1445.6 ~150.0 62.79 83.45 3527.5 1490.2 4200.0 62.37 82.91 3550.6 1534.4 1.11 1358.3 84.1 .08 1403.3 84.2 1.28 1448.2 84.2 3.18 1492.9 84.2 1.27 1537.3 84.2 4250.0 62.48 82.64 3573.7 1578.6 4300.0 62.12 82.61 3596.9 1622.7 4350.0 61.90 82.54 3620.4 1666.7 4400.0. 62.06 82.38 3643.9 1710.6 4450.0 61.85 82.22 3667.4 1754.6 .51 1581.6 84.1 .71 1625.8 84.1 .47 1670.0 84.0 .42 1714.1 84.0 .50 1758.2 84.0 4500.0 61.18 82.35 3691.3 1798.3 4550.0 60.96 82.21 3715.4 1841.9 4600.0 61.44 81.'98 3739.5 1885.5 4650.0 61.83 81.90 3763.3 1929.3 4700.0 62.37 81.88 3786.7 1973.2 1.37 1802.1 83.9 .51 1845.9 83.9 1.03 1889.7 83.8 .80 1933.6 83.8 1.09 1977.8 83.8 Survey' HORIZONTAL COORDINATES feet 95.19 N 927.11 E 98.78 N 966.81 E 102.66 N 1007.08 E 106.79 N 1047.92 E 111.06 N 1089.44 E 115.62 N 1131.65 E 120.66 N 1174.46 E 125.86 N 1217.92 E 130.73 N 1261.94 E 135.00 N 1306.40 E 138.82 N 1351.17 142.49 N 1396.04 146.35 N 1440.82 150.90 N 1485.25 156.17 N 1529.32 161.75 N 1573.29 167.43 N 1617.19 173.13 N 1660.97 178.92 N 1704.73 184.84 N 1748.46 190.73 N 1792.01 196.61 N 1835.37 202.64 N 1878.77 208.81 N 1922.33 215.04 N 1966.08 E E E E E E E E E E Page A Gyrodata P. EXPLORATION AKUK FIELD, WELL NO. NK-25 RTH SLOPE, ALASKA b Number: A0697GCE407 ASURED EPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet 750'.0 :800.0 ~850.0 :900.0 :950.0 i000.0 ;050.0 ~100.0 5150.0 3200.0 63.74 82.02 3809.3 65.00 81.86 3831.0 65.28 81.56 3852.0 65.16 80.59 3872.9 64.99 80.14 3894.0 2017.6 2062.4 2107.6 2152.7 2197.6 65.06 80.13 3915'.1 2242 64.85 80.11 3936.3 2287 64.39 80.07 3957.7 2332 64.28 80.87 3979.4 2377 64.44 82.03 4001.0 2421 .6 .5 .3 .0 .8 5250 5300 5350 5400 5450 .0 .0 .0 .0 .0 64.11 82.28 4022.7 2466 ~3.79 82.62 4044.7 2511 63.80 84'.03 4066.8 2556 64.27 84.99 4088.6 2601 64.91 86.44 4110.1 2646 .6 .4 .1 .0 .1 5500 5550 5600 5650 5700 .0 .0 .0 .0 .0 65.20 86.79 4131.2 2691 65.32 86.85 4152.1 2736 65.22 86.88 4173.0 2782 65.17 86.88 4194.0 2827 64.99 86.86 4215.1 2873 .4 .9 .3 .6 .0 5750.0 5800.0 5850.0 5900.0 5950.0 64.83 86.77 4236.3 2918 64.47 86.56 4257.7 2963 64.30 86.54 4279.3 3008 64.67 86.55 4300.8 3053 64.93 86.60 4322.1 3098 .3 .4 .5 .6 .9 Directional DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 2.74 2022.4 83.7 2.54 2067.4 83.7 .78 2112.8 83.6 1.78 2158.1 83.6 .88 2203.4 83.5 .14 2248.6 83.4 .43 2293.8 83.4 .91 2338.9 83.3 .45 2384.0 83.3 .13 2429.0 83.2 .80 2474.0 83.2 .89 2519.0 83.2 .53 2563.8 83.2 .96 2608.8 83.2 .92 2653.9 83.3 .85 2699.1 83.3 .28 2744.5 83.4 .22 2789.8 83.4 .09 2835.1 83.5 .37 2880.4 83.5 .36 2925.6 83.6 .81 2970.7 83.6 .33 3015.7 83.7 .72 3060.8 83.7 .54 3106.0 83.8 Survey Page HORIZONTAL COORDINATES feet 221.28 N 227.60 N 234.14 N 241.19 N 248.77 N 256.54 N 264.31 N 272.08 N 279.55 N 286.25 N 292.40 N 298.30 N 303.51 N 307.81 N 311.18 N 313.86 N 316.38 N 318.86 N 321.33 N 323.80 N 326.32 N 328.95 N 331.66 N 334.38 N 337.08 N 2010.21 E 2054.84 E 2099.74 E 2144.58 E 2189.29 E 2233.94 E 2278.57 E 2323.07 E 2367.51 E 2412.09 E 2456.71 E 2501.24 E 2545.80 E 2590.54 E 2635.58 E 2680.83 E 2726.17 E 2771.52 E 2816.84 E 2862.12 E 2907.33 E 2952.44 E 2997.44 E 3042.48 E 3087.64 E A Gyrodata P. EXPLORATION iAKUK FIELD, WELL NO. NK-25 )RTH SLOPE, ALASKA lb Number: A0697GCE407 :ASURED I N C L AZIMUTH VERTICAL )EPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet ~000'.0 64.74 86.55 4343.4 ~050.0 64.43 86.52 4364.9 ~100.0 63.96 86.49 4386.6 5150.0 63.73 86.55 4408.7 5200.0 64.03 86.62 4430.7 5250 . 0 64 . 93 86 . 78 4452'. 2 5300.0 65.22 86.80 4473.3 $350.0 65.41 86.87 4494.2 6400.0 65.08 86.99 4515.1 6450.0 64.98 86.93 4536.2 3144.1 3189.3 3234.3 3279.1 3324.0 3369.1 3414.5 3459.9 3505.3 3550.6 6500.0 64.99 86.87 4557.4 6550.0 65.13 86.82 4578.4 6600.0 64.88 86.73 4599.6 6650.0 64.80 86.74 4620.8 6700.0 64.77 86.64 4642.1 3595.9 3641.3 3686.6 3731.8 3777.1 6750.0 64.79 86.65 4663.4 6800.0 64.74 86.60 4684.7 6850.0 64.55 86.63 4706.1 6900.0 64.42 86.72 4727.7 6950.0 64.58 86.76 4749.2 3822.3 3867.5 3912.7 3957.8 4002.9 7000.0 64.59 86.71 4770.7 7050.0 64.59 86.64 4792.1 7100.0' 64.39 86.58 4813.7 7150.0 64.38 86.65 4835.3 7200.0 64.26 86.54 4856.9 4048.1 4093.2 4138.4 4183.4 4228.5 Directional DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. .39 3151.2 83.8 .63 3196.3 83.8 .95 3241.3 83.9 .47 3286.1 83.9 .62 3330.9 84.0 1.83 3376.0 84.0 .58 3421.3 84.0 .39 3466.7 84.1 .70 3512.0 84.1 .23 3557.3 84.1 .11 3602.6 84.2 .29 3647.8 84.2 .53 3693.1 84.2 .15 3738.3 84.3 .19 3783.5 84.3 .04 3828.7 84.3 .13 3873.9 84.4 .38 3919.1 84.4 .32 3964.2 84.4 .33 4009.3 84.4 .10 4054.4 84.5 .12 4099.5 84.5 .43 4144.6 84.5 .12 4189.7 84.5 .32 4234.7 84.6 Survey Page HORIZONTAL COORDINATES feet 339.79 N 342.51 N 345.26 N 347.98 N 350.66 N 353.26 N 355.79 N 358.30 N 360.73 N 363.14 N 365.59 N 368.09 N 370.64 N 373.22 N 375.83 N 378.48 N 381.14 N 383.81 N 386.44 N 389.00 N 391.57 N 394.19 N 396.86 N 399.52 N 402.19 N 3132.82 E 3177.89 E 3222.82 E 3267.62 E 3312.43 E 3357.48 E 3402.75 E 3448.11 E 3493.46 E 3538.72 E 3583.96 E 3629.23 E 3674.48 E 3719.66 E 3764.82 E 3809.98 E 3855.13 E 3900.23 E 3945.28 E 3990.34 E 4035.42 E 4080.51 E 4125.56 E 4170.56 E 4215.54 E A Gyrodat a Dire c t ional P. EXPLORATION AKUK FIELD, WELL NO. NK-25 RTH SLOPE, ALASKA .b Number: A0697GCE407 :ASURED I ~EPTH feet, N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. '250'. 0 ~300.0 ~350.0 ~400.0 ~450.0. 1500.0 7550.0 7600.0 7650.0 7700.0 64.31 86.55 4878.6 64.25 86.49 4900.3 64.09 86.29 4922.1 63.74 86.11 4944.1 63.38 86.20 4966.4 4273.5 4318.6 4363.6 4408.5 4453.2 63.61 86.40 4988.7 4497 63.84 86.57 5010.8 4542 63.97 86.66 5032.8 4587 63.82 86.73 5054.8 4632 63.71 86.84 5076.9 4677 .9 .8 .7 .6 .4 .11 4279.7 84.6 .16 4324.7 84.6 .49 4369.7 84.6 .77 4414.6 84.6 .73 4459.4 84.6 .58 4504.1 84.7 .55 4548.9 84.7 .31 4593.8 84.7 .33 4638.6 84.7 .29 4683.5 84.7 7750 7800 7850 7900 7950 .0 .0 .0 .0 .0 63.62 86.97 5099.1 4722 64.01 86.95 5121.2 4767 63.86 86.95 5143.1 4812 63.39 86.99 5165.3 4856 63.38 87;04 5187.7 4901 .2 .1 .0 .8 .5 .30 4728.2 84.8 .77 4773.1 84.8 .29 4818.0 84.8 · 94 4862.7 84.8 · 09 4907.4 84.8 8000 8050 8100 8150 8200 .0 .0 .0 .0 .0 63.24 87.16 5210.2 4946 62.96 87.23 5232.8 4990 63.04 87.17 5255.5 5035 63.90 87.03 5277.8 5080 63.82 86.61 5299.9 5124 .1 .7 .3 .0 .9 35 4952.0 84.9 58 4996.6 84.9 19 5041.1 84.9 74 5085.8 84.9 77 5130.7 84.9 8250.0 8300.0 8350.0 8400.0 8450.0 64.05 86.56 5321.8 5169 65.13 86.68 5343.3 5215 65.10 86.75 5364.3 5260 65.00 86.56 5385.4 5305 64.93 86.52 5406.6 5350 .8 .0 .3 .6 .9 45 5175.6 84.9 17 5220.7 85.0 14 5266.0 85.0 40 5311.4 85.0 15 5356.6 85.0 Survey Page HORIZONTAL COORDINATES feet 404.91 N 407.64 N 410.48 N 413.46 N 416.46 N 419.35 N 422.10 N 424.75 N 427.34 N 429.85 N 432.27 N 434.65 N 437.04 N 439.40 N 441.73 N 443.99 N 446.17 N 448.34 N 450.61 N 453.09 N 455.77 N 458.43 N 461.03 N 463.67 N 466.41 N 4260.51 E 4305.47 E 4350.39 E 4395.20 E 4439.86 E 4484.52 E 4529.27 E 4574.09 E 4618.92 E 4663.70 E 4708.44 E 4753.25 E 4798.10 E 4842.83 E 4887.48 E 4932.09 E 4976.63 E 5021.12 E 5065.80 E 5110.62 E 5155.45 E 5200.53 E 5245.82 E 5291.07 E 5336.30 E A Gyrodata P. EX.~LORATIO~ iAKUK FIELD, WELL NO. NK-25 )RTH SLOPE, ALASKA lb Number: A0697GCE4.07 Directional Survey Page ~ASURED I N C L AZIMUTH VERTICAL )EPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 3500.0 64.80 86.38 5427.8 3550.0 64.60 86.49 5449.2 3600.0 65.17 86.74 5470.4 3650.0 65.62 87.55 5491.2 3700.0 65.46 87.93 5511.9 8750.0 65.68 87.89 5532.6 8800.0 65.47 87:83 5553.3 8850.0 65.20 87.90 5574.2 8900.0 65.01 88.08 5595.2 8950.0 64.80 88.33 5616.4 5396.2 5441.4 5486.6 5532.1 5577.6 5623.1 5668.7 5714.1 5759.5 5804.7 .37 5401.9 85.0 .46 5447.1 85.0 1.24 5492.3 85.0 1.71 5537.8 85.1 .76 5583.2 85.1 .43 5628.7 85.1 .42 5674.2 85.1 .56 5719.6 85.1 .50 5764.9 85.2 .62 5810.1 85.2 469.21 N 472.02 N 474.69 N 476.95 N 478.75 N 480.41 N 482.11 N 483.80 N 485.39 N 486.81 N 5381.48 E 5426.59 E 5471.79 E 5517.19 E 5562.67 E 5608.16 E 5653.65 E 5699.06 E 5744.39 E 5789.64 E 9000.0 65.12 88.62 5637.6 9050.0 65.71 88.67 5658.4 9100.0 66.31 89.13 5678.7 9150.0 66.58 89.22 5698.7 9200.0 66.54 89.33 5718.6 5850.0 5895.5 5941.2 5987.0 6032.8 84 5855.3 85.2 17 5900.7 85.2 47 5946.3 85.3 57 5992.0 85.3 22 6037.8 85.3 488.01 N 489.09 N 489.96 N 490.63 N 491.21 N 5834.93 E 5880.38 E 5926.05 E 5971.88 E 6017.75 E 9250.0 67.12 89.39 5738.2 9300.0 66.41 89.35 5758.0 9350.0 66.09 89.38 5778.1 9400.0 66.03 89.47 5798.4 9450.0 66.06 89.50 5818.7 6078.8 6124.7 6170.4 6216.1 6261.8 . 16 6083.6 85.4 42 6129.5 85.4 65 6175.1 85.4 20 6220.7 85.5 09 6266.3 85.5 491.72 N 492.23 N 492.74 N 493.20 N 493.61 N 6063.72 E 6109.66 E 6155.42 E 6201.12 E 6246.81 E 9500.0 66.20 89.50 5838.9 9550.0' 66.17 89.55 5859.1 9600.0 65.76 89.80 5879.5 9650.0 '64.93 90.19 5900.3 9700.0 64.60 90.30 5921.7 6307.5 6353.2 6398.8 6444.3 6489.4 27 6311.9 85.5 12 6357.5 85.5 92 6403.1 85.6 81 6448.4 85.6 70 6493.5 85.6 494.01 N 494.38 N 494.64 N 494.65 N 494.46 N 6292.53 E 6338.27 E 6383.93 E 6429.38 E 6474.60 E A Gyrodata P. EXPLORATION AKUK FIELD, WELL NO. NK-25 RTH SLOPE, ALASKA b Number: A0697GCE407 ASURED tEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet ~750.0 ~800.0 ~850.0 }900.0 )950.0 )000.0 )050.0 )100.0 ]150.0 D200.O 64.38 90~63 5943.2 64.52 90.75 5964.8 64.12 90.81 5986.4 64.31 90.96 6008.2 63.81 91.14 6030.1 · 63.70 91.24 6052.2 63.80 91.30 6074.3 63.62 91.32 6096.4 63.40 91.41 6118.7 63.08 91.38 6141.2 6534.5 6579.5 6624.5 6669.5 6714.4 6759.1 6803.9 6848.6 6893.3 6937.8 3250.0 0300.0 0350.0 0400.0 0450.0 63.08 91.24 6163.9 63.48 91.35 6186.4 63.25 91.46 6208.8 63.37 91.60 6231.2 63.76 91.48 6253.5 6982.3 7026.9 7071.5 7116.1 7160.7 0500.0 0550.0 0600.0 0650.0 0700.0 63.97 91.56 6275.5 64.39 91.66 6297.3 64.57 91..79 6318.8 64.75 91.79 6340.2 64.92 91.46 6361.5 7205.5 7250.4 7295.4 7340.5 7385.6 0750.0 ,0800.0 .0850.0 .0900.0 .0950.0 65.36 90.88 6382.5 65.85 91.23 6403.2 66.19 91.40 6423.5 66.11 91.32 6443.7 65.62 91.30 6464.2 7430.9 7476.4 7522.0 7567.6 7613.1 Directional DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. .75 6538.4 85.7 .35 6583.4 85.7 .80 6628.2 85.7 .45 6673.1 85.8 1.05 6717.9 85.8 .28 6762.5 85.8 .23 6807.1 85.9 .37 6851.8 85.9 .47 6896.3 85.9 .63 6940.8 86.0 .24 6985.2 86.0 .82 7029.6 86.0 .51 7074.1 86.1 .34 7118.6 86.1 .81 7163.2 86.2 .43 7207.9 86.2 .87 7252.7 86.2 .41 7297.6 86.3 .36 7342.6 86.3 .69 7387.6 86.3 , 36 7432.8 86.3 18 7478.2 86.4 74 7523.7 86.4 21 7569.3 86.4 98 7614.8 86.5 Survey' Page HORIZONTAL COORDINATES feet 494.10 N 493.55 N 492.94 N 492.24 N 491.42 N 490.49 N 489.49 N 488.47 N 487.40 N 486.31 N 485.30 N 484.29 N 483.19 N 482.00 N 480.79 N 479.60 N 478.34 N 476.98 N 475.57 N 474.29 N 473.36 N 472.52 N 471.47 N 470.38 N 469.34 N 6519.72 E 6564.83 E 6609.89 E 6654.90 E 6699.86 E 6744.69 E 6789.53 E 6834.34 E 6879.08 E 6923.71 E 6968.28 E 7012.93 E 7057.61 E 7102.27 E 7147.03 E 7191.90 E 7236.89 E 7281.99 E 7327.16 E 7372.39 E 7417.75 E 7463.28 E 7508.95 E 7554.67 E 7600.29 E A Gyrodat a Dire c t ional P. EXPLORATION AKUK FIELD, WELL NO. NK-25 ~RTH SLOPE, ALASKA ~b Number: A0697GCE407 :ASURED I N C L AZIMUTH VERTICAL )EPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. L000.0 65.09 91.31 6485.0 L050.0 65.52 91.34 6505.9 [100.0 65.55 91.42 6526.6 L150.0 65.62 91.50 6547.3 L200.0 66.06 91.58 6567.7 · 1250.0 66.35 91.66 6587.9 1300.0 66.46 91.73 6607.9 1350.0 66.13 91.55 6628.0 1400.0 65.87 91.19 6648.4 1450.0 65.63 90.73 6668.9 7658.5 7703.8 7749.2 7794.7 7840.2 7885.8 7931.5 7977.2 8022.8 8068.3 1.07 7660.0 86.5 .86 7705.3 86.5 .17 7750.7 86.6 · 21 7796.0 86.6 · 88 7841.5 86.6 · 61 7887.0 86.6 ,25 7932.7 86.7 .73 7978.3 86.7 .84 8023.8 86.7 · 97 8069.3 86.7 1500.0 65.47 90.22 6689.6 1550.0 65.20 90.18 6710.5 1600.0 65.50 90.19 6731.3 1650.0 64.64 89.47 6752.4 1700.0 64.06 '89.16 6774.0 8113.7 8159.1 8204.5 8249.8 8294.9 .98 8114.7 86.8 · 54 8160.1 86.8 .61 8205.4 86.8 2.15 8250.7 86.8 1.29 8295.7 86.8 .1750.0 64.21 89.34 6795.8 ~1800.0 64.50 89.10 6817.5 .1850.0 64.21 88.60 6839.1 .1900.0 63.93 88.51 6861.0 .1950.0 64.21 88.55 6882.9 8339.9 8384.9 8430.0 8475.0 8519.9 .44 8340.7 86.8 .71 8385.7 86.9 1.06 8430.8 86.9 .59 8475.7 86.9 .57 8520.7 86.9 .2000.0 64.23 88.59 6904.6 :2050.0 64.29 88.65 6926.3 L2100.0 64.45 88.64 6947.9 L2150.0 64.53 88.59 6969.5 L2200.0 64.29 88.79 6991.1 8564.9 8610.0 8655.0 8700.2 8745.2 .09 8565.7 86.9 .16 8610.7 86.9 .33 8655.7 86.9 .16 8700.9 86.9 .59 8745.9 86.9 Survey HORIZONTAL COORDINATES feet 468.30 N 467.25 N 466.16 N 465.00 N 463.77 N 462.47 N 461.12 N 459.81 N 458.71 N 457.95 N 457.57 N 457.41 N 457.26 N 457.40 N 457.93 N 458.52 N 459.14 N 460.05 N 461.18 N 462.33 N 463.45 N 464.54 N 465.61 N 466.70 N 467.73 N 7645.72 E 7691.13 E 7736.63 E 7782.14 E 7827.75 E 7873.48 E 7919.28 'E 7965.04 E 8010.70 E 8056.29 E 8101.80 E 8147.24 E 8192.68 E 8238.02 E 8283.09 E 8328.08 E 8373.15 E 8418.21 E 8463.16 E 8508.11 E 8553.12 E 8598.15 E 8643.22 E 8688.33 E 8733.41 E Page A Gyrodata Direct ional Survey' ?. EXPLORATION ~KUK FIELD, WELL NO. NK-25 RTH SLOPE, ALASKA b Number: A0697GCE407 Page 10 ASURED, I EPTH feet N C L AZIMUTH VERTICAL DEPTH deG. deG. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 250~. 0 300.0 350.0 :400.0 :450.0 1500.0 ~550.0 .~600.0 ~.650.0 ~.700.0 63.58 88.96 7013.0 8790.2 63.61 89.03 7035.3 8834.9 63.68 89.08 7057.5 8879.7 63.87 89.10 7079.6 8924.6 63.97 89.13 7101.5 8969.4 64.23 89.04 7123'.4 9014.4 63.83 89.08 7145.3 9059.3 64.26 89.01 7167.2 9104.3 64.14 89.10 7188.9 9149.3 64.44 89.02 7210.6 9194.3 1.45 8790.8 86.9 .13 8835.6 87.0 ..18 8880.3 87.0 .38 8925.2 87.0 .20 8970.0 87.0 .53 9015.0 87.0 .79 9059.9 87.0 .87 9104.8 87.0 .30 9149.8 87.0 .62 9194.9 87.0 468.61 N 469.40 N 470.13 N 470.84 N 471.54 N 472.26 N 473.00 N 473.74 N 474.49 N 475.22 N 8778.32 E 8823.10 E 8867.89 E 8912.74 E 8957.65 E 9002.62 E 9047.56 E 9092.52 E 9137.53 E 9182.57 E 2750.0 2800.0 2850.0 2900.0 2950.0 64.26 89.05 7232.3 9239.4 64.55 89.09 7253.9 9284.5 64.74 89.09 7275.3 9329.6 64.60 89.22 7296.7 9374.8 64.68 89.09 7318.1 9420.0 .36 9239.9 87.0 .57 9285.0 87.1 .38 9330.1 87.1 .36 9375.3 87.1 .28 9420.4 87.1 475.98 N 476.72 N 477.44 N 478.11 N 478.77 N 9227.64 E 9272.73 E 9317.90 E 9363.09 E 9408.27 E 3000.0 3050.0 3100.0 3150.0 3200.0 64.62 88.99 7339.5 9465.2 64.43 88.94 7361.0 9510.3 64.23 88.86 7382.6 9555.3 64.38 88.84 7404.3 9600.4 64.78 88.83 7425.8 9645.5 .22 9465.6 87.1 .40 9510.7 87;1 .42 9555.8 87.1 .30 9600.8 87.1 .79 9645.9 87.1 479.53 N 480.35 N 481.22 N 482.12 N 483.04 N 9453.45 E 9498.58 E 9543.63 E 9588.68 E 9633.83 E 3250.0 3300.0 3350.0 ,3400.0 .3450.0 64.86 88.82 7447.1 9690.8 65.15 88.'79 7468.2 9736.1 64.97 88.59 7489.3 9781.4 64.94 88.54 7510.4 9826.7 65.20 88.52 7531.5 9872.0 · 16 9691.2 87.1 · 60 9736.5 87.1 · 51 9781.8 87.2 · 10 9827.1 87.2 · 52 9872.4 87.2 483.97 N 484.92 N 485.96 N 487.09 N 488.26 N 9679.07 E 9724.37 E 9769.70 E 9814.98 E 9860.31 E A Gyrodata P. EXPLORATION '.AKUK FIELD, WELL NO. NK-25 )RTH .SLOPE, ALASKA ~b Number: A0697GCE407 ~ASURED I )EPTH feet N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet ~500.0 ]550.0 ]600.0 3650.0 3700..0 3750.0 3800.0 3850.0 3900.0 3950.0 65.06 88.47 7552.6 65.01 88.39 7573.7 65.37 88.42 7594.6 64.76 88.37 7615.7 64.20 88.26 7637.3 · 63.88 88.09 7659.1 63.95 88.09 7681.1 64.24 88.10 7703.0 64.49 88.09 7724.6 64.69 88.12 7746.1 99'17.4 9962.7 10008.1 10053.4 10098.6 10143.5 10188.4 10233.4 10278.5 10323.6 4000.0 4050.0 4100.0 4150.0 4200.0 64.00 87.97 7767.7 10368 63.79 88.03 7789.7 10413 64.04 88.00 7811.7 10458 64.20 88.03 7833.5 10503 64.38 88.03 7855.2 10548 .7 .6 .5 .5 .5 4250.0 4300.0 4350.0 4400.0 4450.0 64.67 88.01 7876.7 10593 64.74 88.04 7898.1 10638 65.07 88.06 7919.3 10684 64.33 88..43 7940.7 10729 64.05 88.63 7962.4 10774 .7 .9 .2 .4 .4 .4500.0 .4550.0 .4600.0 .4650.0 .4700.0 64.30 88.64 7984.2 64.49 88.67 8005.8 64.93 88.61 8027.2 64.89 88.79 8048.4 64.42 88.87 8069.8 10819.4 10864.4 10909.6 10954.9 11000.1 l}|l|[,l ' Directional DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. .29 9917.7 87.2 .17 9963.1 87.2 .72 10008.4 87.2 .23 10053.8 87.2 .13 10098.9 87.2 .71 10143.8 87.2 .14 10188.7 87.2 .58 10233.7 87.2 .51 10278.8 87.2 .40 10323.9 87.2 .40 10369.0 87.2 .43 10413.9 87.2 .49 10458.8 87.2 .34 10503.8 87.2 .35 10548.8 87.2 .59 10593.9 87.2 .16 10639.1 87.2 .66 10684.4 87.2 .62 10729.6 87.2 .68 10774.6 87.3 .52 10819.6 87.3 .37 10864.7 87.3 .89 10909.9 87.3 .32 10955.2 87.3 .96 11000.3 87.3 Survey Page HORIZONTAL COORDINATES feet 489.45 N 490.69 N 491.95 N 493.23 N 494.56 N 495.99 N 497.49 N 498.98 N 500.48 N 501.97 N 503.51 N 505.08 N 506.64 N 508.19 N 509.74 N 511.30 N 512.85 N 514.39 N 515.78 N 516.93 N 518.01 N 519.07 N 520.14 N 521.17 N 522.09 N 9905.66 E 9950.97 E 9996.34 E 10041.66 E 10086.76 E 10131.69 E 10176.58 E 10221.53 E 10266.58 E 10311.72 E 10356.76 E 10401.63 E 10446.51 E 10491.47 E 10536.49 E 10581.60 E 10626.78 E 10672.04 E 10717.22 E 10762.22 E 10807.21 E 10852.29 E 10897.48 E 10942.75 E 10987.93 E 11 A Gyrodata Di P. EXPLORATION [AKUK FIELD, WELL NO. NK-25 )RTH SLOPE, ALASKA )b Number: A0697GCE407 r e c t i o n a 1 Survey PaGe 12 ~ASURED I N C L AZIMUTH VERTICAL )EPTH DEPTH feet deG. deG. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deG./ feet deG. 100 ft. HORIZONTAL COORDINATES feet i750.0 63.95 89.02 8091.6 t800.0 63.84 89.09 8113.6 t850.0 64.08 89.19 8135.5 1900.0 64.16 89.33 8157.3 4950.0 64.33 89.42 8179.1 5000.0 64.63 89.53 8206.6 5050.0 64.74 89.60 8222.0 5100.0 64.85 89.72 8243.3 5150.0 65.18 89.78 8264.4 5200.0 65.16 89.96 8285.4 11045.1 11090.0 11134.9 11179.9 11224.9 11270.0 11315.1 11360.4 11405.6 11451.0 .98 11045.3 87.3 .24 11090.2 87.3 .52 11135.1 87.3 .30 11180.1 87.3 .37 11225.1 87.3 .63 11270.2 87.3 .26 11315.3 87.3 .30 11360.5 87.3 .67 11405.8 87.4 .33 11451.1 87.4 522.92 N 11032.93 E 523.66 N 11077.83 E 524.33 N 11122.75 E 524.91 N 11167.73 E 525.40 N 11212.76 E 525.81 N 11257.88 E 526.16 N 11303.08 E 526.42 N 11348.31 E 526.62 N 11393.63 E 526.72 N 11439.01 E 5250.0 65.15 89.71 8306.4 5300.0 64.97 89.67 8327.5 5350.0 65.01 89.71 8348.6 5400.0 65.03 89.79 8369.7 5450.0 64.94 89.84 8390.9 11496.3 11541.6°_ 11586.9 11632.2 11677.5 .46 11496.5 87.4 .37 11541.8 87.4 .12 11587.0 87.4 .15 11632.3 87.4 .21 11677.6 87.4 526.85 N 11484.38 E 527.09 N 11529.72 E 527.34 N 11575.03 E 527.53 N 11620.36 E 527.68 N 11665.67 E 5500.0 64.85 89.89 8412.1 5550.0 64.67 89.94 8433.4 .5600.0 64.43 8'9.98 8454 . 9 ~5650 . 0 63 . 52 90 . 11 8476 . 8 .5700 . 0 63 . 54 90 . 11 8499 . 1 11722.7 11767.9 11813.0 11857.9 11902.6 .20 11722.8 87.4 .37 11768.0 87.4 .48 11813.1 87.4 1.85 11858.0 87.4 .05 11902.7 87.5 527.78 N 11710.94 E 527.85 N 11756.17 E 527.88 N 11801.32 E 527.85 N 11846.25 E 527.77 N 11891.01 E .5750.0 63.39 90.09 8521.4 .5800.0 63.29 90.18 8543.9 .5850.0 62.92 90.30 8566.5 .5900.0 62.52 89.95 8589.4 .5950.0 61.89 89.90 8612.7 11947.3 11992.0 12036.5 12080.9 12125.1 .31 11947.4 87.5 .27 11992.0 87.5 .76 12036.6 87.5 1.02 12081.0 87.5 1.27 12125.2 87.5 527.69 N 11935.74 E 527.58 N 11980.43 E 527.40 N 12025.02 E 527.30 N 12069.46 E 527.36 N 12113.69 E A Gyrodat a Dire c t ional Survey P. EXPLORATION AKUK FIELD, WELL NO. NK-25 ,RTH SLOPE, ALASKA ,b Number: A0697GCE407 Page 13 IASURED I )EPTH feet N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet ;000.0 ;050.0 ;100.0 ;150.0 ;200.0 5250.0 7300.0 5350.0 5400.0 5450.0 61.71 89.46 8636.4 61.67 89.33 8660.1 61.79 89.33 8683.7 61.75 89.39 8707.4 61.26 88.68 8731.2 12169.2 12213.2 12257.2 12301.2 12345.1 61.06 8.8.42 875~.4 12388 61.21 88.45 8779.5 12432 61.14 88.48 8803.6 12476 61.28 88.54 8827.7 12520 61.24 88.50 8851.7 12564 .9 .7 .5 .3 .2 .85 12169.2 87.5 .24 12213.2 87.5 .24 12257.2 87.5 .14 12301.2 87.5 1.59 12345.2 87.5 .60 12389.0 87.5 .31 12432.7 87.5 .16 12476.5 87.6 .30 12520.4 87.6 .10 12564.2 87.6 527.60 N 528.07 N 528.58 N 529.08 N 529.82 N 530.92 N 532.12 N 533.29 N 534.43 N 535.57 N 12157.75 E 12201.77 E 12245.81 E 12289.86 E 12333.79 E 12377.58 E 12421.35 E 12465.14 E 12508.95 E 12552.77 E 6500.0 6550.0 6600~0 6650.0 6700.0 61.41 88.59 8875.7 12608 61.41 88.63 8899.6 12651 61.45 88.60 8923.6 12695 61.58 88.60 8947.4 12739 61.69 88.67 8971.1 12783 .0 .9 .8 .8 .8 .37 12608.1 87.6 .07 12651.9 87.6 .09 12695.9 87.6 .27 12739.8 87.6 .25 12783.8 87.6 536.68 N 537.75 N 538.81 N 539.88 N 540.93 N 12596.63 E 12640.52 E 12684.41 E 12728.35 E 12772.33 E 6750.0 6800.0 6850.0 6900.0 6950.0 61.86 88.57 8994.8 12827 61.83 88.66 9018.4 12871 62.05 88.70 9041.9 12916 62.09 88.79 9065.3 12960 62.31 88.82 9088.6 13004 .8 .9 .0 .2 .4 .37 12827.8 87.6 .16 12871.9 87.6 .46 12916.0 87.6 .17 12960.2 87.6 .44 13004.4 87.6 541.99 N 543.06 N 544.08 N 545.04 N 545.97 N 12816.38 E 12860.45 E 12904.56 E 12948.72 E 12992.94 E ,7000.0 .7050.0 .7100.0 .7150.0 .7200.0 62.44 88~59 9111.8 13048 61.70 88.75 9135.3 13092 60.66 88.95 9159.4 13136 60.46 88.89 9183.9 13180 60.37 89.30 9208.6 13223 .7 .9 .7 .2 .7 49 13048.7 87.6 51 13092.9 87.6 11 13136.7 87.6 41 13180.2 87.6 73 13223.7 87.6 546.97 N 547.99 N 548.87 N 549.69 N 550.38 N 13037.23 E 13081.39 E 13125.19 E 13168.73 E 13212.20 E A Gyrodat a Direc t ional Survey P. EXPLORATION AKUK FIELD, WELL NO. NK-25 RTH SLOPE, ALASKA b Number: A0697GCE407 ASURED ~EPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet '250'.0 60.32 89.68 9233.4 '300.0 60.12 89.92 9258.2 '350.0 59.45 90.22 9283.4 '400.0 59.93 90.81 9308.6 '450.0 60.68 90.98 9333.4 '500.0 61.16 91.19 935~.7 ~550.0 61.11 91.22 9381.8 ~600.0 61.56 91.45 9405.8 7650.0 61.89 91.62 9429.5 7700.0° 61.59 91.35 9453.1 13267.1 13310.5 13353.6 13396.7 13440.1 13483.7 13527.4 13571.2 13615.1 13659.1 .67 13267.1 87.6 .57 13310.5 87.6 1.44 13353.6 87.6 1.39 13396.7 87.6 1.52 13440.1 87.7 1.04 13483.7 87.7 .11 13527.4 87.7 .98 13571.2 87.7 .72 13615.1 87.7 .75 13659.1 87.7 550.77 N 550.93 N 550.87 N 550.48 N 549.80 N 548.98 N 548.06 N 547.04 N 545.86 N 544.71 N 13255.65 E 13299.05 E 13342.26 E 13385.42 E 13428.85 E 13472.54 E 13516.31 E 13560.17 E 13604.19 E 13648.22 E 7750.0 61.42 91.24 9477.0 7800.0 61.36 91.T3 9500.9 7850.0 60.98 91.45 9525.1 7881.0 60.82 91.55 9540.1 7900.0 59.03 92.69 9549.7 13702.9 13746.7 13790.4 13817.5 13833.9 .40 13702.9 87.7 .23 13746.8 87.7 .95 13790.5 87.7 .57 13817.5 87.8 10.76 13833.9 87.8 543.72 N 542.81 N 541.82 N 541.11 N 540.51 N 13692.15 E 13736.03 E 13779.82 E 13806.90 E 13823.33 E [nal Station Closure: Distance: 13833.89 ft Az: 87.76 deg. Page 14 A Gyrodat a D i re c t ional Survey for B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA )b Number: SUB407 in Date: 10-Jun-97 20:00:00 ~rveyor: TOM STODDARD ~lculation Method: MINIMUM CURVATURE urvey Latitude: 70.350000 deg. N ub-sea Correction from Vertical Reference: 60.1 ft. zimuth Correction: yro: Bearings are Relative to True North roposed Well Direction: 87.650 deg 'ertical Section Calculated from Well Head Location llosure Calculated from Well Head Location [orizontal Coordinates Calculated from Local Horizontal Reference P. EXPLORATION AKUK FIELD, WELL NO. RTH SLOPE, ALASKA b Number: SUB407 A Gy r o da t NK-25 iUBSEA ~EPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet -60.1 100.0 200.0 300.0 400.0 500.0 600.0 700.0 800.0 900.0 0.00 0.00 0.0 .25 100.45 160.1 .62 161.91 260.1 1.06 172.79 360.1 1.29 160.88 460.1 1.27 135.46 56~.1 1.19 114.75 660.1 1.30 98.00 760.1 1.87 87.01 860.1 2.24 83.31 960.1 a D i r e c t i ona i Survey DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 1000.0 1100.0 1200.0 1300.0 1400.0 2.29 82.06 1060.1 2.27 81.83 1160.1 2.38 81.93 1260.1 3.10 83.28 1360.1 3.88 84.01 1460.1 0.0 0.00 0.0 0.0 .3 .29 .4 64.3 . 5 . 54 1 . 0 118 . 5 .6 .49 2.8 155.7 1.1 .37 5.0 162.6 1500.0 1600.0 1700.0 1800.0 1900.0 4.78 83.22 1560.1 5.49 82.75 1660.1 6.16 82.44 1760.1 7.65 83.87 1860.1 10.58 85.87 1960.1 2.1 3.7 5.7 8.5 12.1 2000.0 2100.0 2200.0 2300.0 2400.0 14.63 85.25 2060.1 18.07 82.90 2160.1 21.50 83.60 2260.1 24.84 83.14 2360.1 28.29 82.68 2460.1 16.0 20.0 24.0 28.8 34.9 42.4 51.4 61.5 73.6 89.6 111.9 140.9 176.7 219.4 269.1 .58 7.0 158.3 .45 8.7 150.3 .40 10.3 141.4 .68 12.5 131.0 .41 15.6 120.7 .07 19.0 112.6 .05 22.6 107.0 .15 26.4 103.0 .73 31.4 99.8 .79 37.9 97.1 90 45.8 94.7 70 55.1 92.7 67 65.7 91.0 51 78.4 89.7 92 96.1 88.9 , 2. 3. 2. 3. 98 119.9 88.2 39 150.0 87.3 38 185.1 86.5 92 225.3 85.9 16' 270.4 85.4 Page HORIZONTAL COORDINATES feet 0.00 N 0.00 E .10 N .28 E .53 S .51 E 1.91 S .72 E 3.88 S 1.22 E 5.70 S 2.32 E 6.90 S 4.00 E 7.47 S 6.05 E 7.51 S 8.79 E 7.18 S 12.36 E 6.67 S 16.29 E 6.11 S 20.24 E 5.54 S 24.25 E 4.94 S 29.00 E 4.28 S 35.06 E 3.43 S 42.58 E 2.32 S 51.50 E 1.00 S 61.62 E .76 N 73.63 E 1.76 N 89.62 E 3.50 N 111.84 E 6.66 N 140.72 E 10.71 N 176.39 E 15.69 N 218.95 E 21.75 N 268.43 E P. EXPLORATION AKUK FIELD, WELL NO. RTH SLOPE, ALASKA b Number: SUB407 A Gy r o d a t NK-25 UBSEA EPTH feet I N C L AZIMUTM VERTICAL DEPTH dego deg.. feet VERTICAL SECTION feet 2500.0 2600.0 2700.0 2800.0 2900.0 3000.0 3100.0 3200.0 3300.0 3400.0 '32.11 81.52 2560.1 36.01 81.54 2660.1 39.47 81.92 2760.1 42.06 83.18 2860.1 44.62 84.91 2960.1 327.3 394.4 472.0 557.5 652.1 48.54 85.51 3060'.1 757.0 '51.36 85.08 3160.1 876.8 54.53 84.34 3260.1 1008.1 59.75 83.23 3360.1 1162.3 64.18 85.29 3460.1 1353.1 3500.0 3600.0 3700.0 3800.0 3900.0 62.42 82.80 3560.1 1552.6 61.92 82.27 3660.1 1740.9 61.78 81.91 3760.1 1923.4 65.23 81.19 3860.1 2125.0 64.38 80.16 3960.1 2337.2 4000.0 4100.0 4200.0 4300.0 4400.0 63.80 83.61 4060.1 2542.6 65.28 86.86 4160.1 2754.2 64.45 86.56 4260.1 2968.5 64.50 86.53 4360.1 3179.3 65.04 86.'79 4460.1 3386.1 4500.0 4600.0 4700.0 4800.0 4900.0 65.01 86.86 4560.1 3601.8 64.79 86.65 4660.1 3815.2 64.58 86.74 4760.1 4025.9 64.26 86.54 4860.1 4235.0 63.48 86.17 4960.1 4440.6 a D i re c t i ona i Survey DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 3.10 347.2 84.8 3.38 404.3 84.2 1.91 497.9 83.8 2.58 563.6 83.6 1.60 667.2 83.7 3.19 776.8 83.9 1.24 892.6 84.1 2.43 1012.3 84.2 3.07 1180.6 84.1 1.19 1358.3 84.1 .96 1581.6 84.2 .47 1758.2 84.0 .83 1933.6 83.8 1.17 2158.1 83.6 .97 2384.0 83.3 2.04 2563.8 83.2 .26 2789.8 83.4 .75 3015.7 83.6 .58 3196.3 83.8 1.36 3421.3 84.0 14 3647.8 84.2 07 3828.7 84.3 21 4054.4 84.4 29 4279.7 84.6 74 4459.4 84.6 HORIZONTAL COORDINATES feet 29.96 N 326.32 E 39.97 N 393.12 E 51.22 N 470.30 E 62.49 N 555.37 E 72.08 N 649.72 E 80.69 N 754.35 E 90.56 N 873.81 E 102.43 N 1004.74 E 118.77 N 1158.38 E 138.59 N 1348.52 E 158.47 N 183.00 N 207.98 N 236.87 N 272.90 N 301.94 N 317.33 N 329.25 N 341.91 N 354.21 N 365.92 N 378.07 N 390.31 N 402.59 N 415.61 N 1547.45 E 1734.87 E 1916.50 E 2117.11 E 2327.96 E 2532.38 E 2743.49 E 2957.45 E 3167.91 E 3374.41 E 3589.86 E 3802.94 E 4013.22 E 4222.08 E 4427.28 E Page A Gyrodat a Di re c t i ona i P. EXPLORATION [AKUK FIELD, WELL NO. )RTH SLOPE, ALASKA )b Number: SUB407 NK-25 ~UBSEA )EPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. 5000.0 63.80 5100.0 . 63.50 5200.0 63.21 5300.0 65.11 5400.0 64.89 5500.0 65.38 5600.0'65.76 5700.0 66.38 5800.0 66.15 5900.0 64.49 86.76 5060.1 4643.3 86.98 5160.1 4846.2 87.14 5260.1 5044.5 86.74 5360.1 5251.2 86.62 5460.1 5464.6 87.86 5566.1 5683 88.71 5660.1 5899 89.35 5760.1 6129 89.57 5860.1 6355 90.72 5960.1 6569 .5 .4 .5 .4 .8 .32 4683.5 84.7 .79 4862.7 84.8 .51 5085.8 84.9 .55 5266.0 85.0 .86 5492.3 85.0 .46 5719.6 85.1 1.20 5946.3 85.2 1.34 6175.1 85.4 .16 6403.1 85.5 .44 6583.4 85.7 6000.0 63.74 6100.0 63.08 6200.0 63.82 6300.0 64.91 6400.0 65.72 91.,2'6 6060.1 6775 91.2~ 6160.1 6974 91.51 6260.1 7174 91.48 6360.1 7382 91.30 6460.1 7604 .2 .9 .2 .7 .1 .26 6807.1 85.9 .31 6985.2 86.0 .70 7207.9 86.2 .66 7387.6 86.3 .83 7614.8 86.5 6500.0 65.90 6600.0 65.73 6700.0 64.43 6800.0 63.94 6900.0 64.50 91.55 6560.1 7823 90.93 6660.1 8048 89.36 6760.1 8265 88.52 6860.1 8473 88.61 6960.1 8680 .2 .8 .9 .1 .5 63 7841.5 86.6 92 8069.3 86.7 85 8295.7 86.8 61 8475.7 86.9 24 8700.9 86.9 7000.0 63.71 7100.0 64.12 7200.0 64.60 7300.0 64.44 7400.0 65.04 89.09 7060.1 8885.0 89.03 7160.1 9089.8 89.09 7260.1 9297.7 88.94 7360.1 9508.4 88.80 7460.1 9718.7 .20 8925.2 87.0 .84 9104.8 87.0 .51 9330.1 87.1 .39 9510.7 87.1 .43 9736.5 87.1 Survey Page HORIZONTAL COORDINATES feet 427.94 N 438.84 N 448.81 N 460.50 N 473.39 N 482.66 N 489.16 N 492.28 N 494.40 N 493.67 N 490.13 N 485.47 N 480.43 N 474.37 N 469.54 N 464.23 N 458.27 N 457.59 N 461.13 N 466.22 N 470.22 N 473.50 N 476.93 N 480.32 N 484.55 N 4629.63 E 4832.29 E 5030.30 E 5236.68 E 5449.82 E 5668.46 E 5884.25 E 6114.49 E 6340.45 E 6555.06 E 6760.76 E 6960.84 E 7160.48 E 7369.41 E 7591.24 E 7810.73 E 8036.76 E 8254.07 E 8461.33 E 8668.67 E 8873.23 E 9078.01 E 9285.91 E 9496.71 E 9707.01 E P. EXPLORATIO~ AKUK FIELD, WELL NO. tRTH SLOPE, ALASKA ,b Number: SUB407 A Gyroda t a D i re c t i ona i Survey NK-25 Page :UBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE )EPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. '~ 100 ft. HORIZONTAL COORDINATES feet 7500.0 65.04 88.44 7560.1 9933.6 .24 9963.1 87.2 7600.0 63.88 88.09 7660.1 10145.5 .69 10188.7 87.2 7700.0 64.24 88.02 7760.1 10352.9 1.05 10369.0 87.2 7800.0 64.44 88.03 7860.1 10558.8 .40 10593.9 87.2 7900.0 64.08 88.60 7960.1 10769.6 .78 10774.6 87.2 8000.0 64.63 88.83 8060.1 10979.7 .67 11000.3 87.3 8100.0 64.19 89.34 8160.1 11185.6 .31 11225.1 87.3 8200.0 65.11 89.77 8260.1 11396.5 .59 11405.8 87.4 8300.0. 65.03 89.76 8360.1 11611.6 .14 11632.3 87.4 8400.0 64.22 90.01 8460.1 11823.7 .80 11858.0 87.4 489.89 N 496.05 N 502.97 N 510.09 N 516.81 N 521.67 N 524.97 N 526.58 N 527.45 N 527.87 N 9921.86 E 10133.66 E 10340.93 E 10546.74 E 10757.42 E 10967.51 E 11173.48 E 11384.44 E 11599.70 E 11812.01 E 8500.0 63.03 90.27 8560.1 12023.9 .62 12036.6 87.5 8600.0 61.68 89.33 8660.1 12213.2 .24 12257.2 87.5 8700.0 61.09 88.43 8760.1 12397.6 .54 12432.7 87.5 8800.0 61.30 88.53 8860.1 12579.5 .19 12608.1 87.6 8900.0 61.64 88.'64 8960.1 12763.3 .26 12783.8 87.6 527.45 N 528.07 N 531.16 N 535.96 N 540.44 N 12012.42 E 12201.84 E 12386.19 E 12568.09 E 12751.88 E 9000.0 62.08 88.77 9060.1 12950.3 .23 12960.2 87.6 9100.0 60.65 88.95 9160.1 13138.0 2.06 13180.2 87.6 9200.0 60.07 89.94 9260.1 13313.7 .64 13353.6 87.6 9300.0 61.15 91.19 9360.1 13488.1 .94 13527.4 87.7 9400.0 61.54 91.32 9460.1 13671.9 .65 13702.9 87.7 544.83 N 12938.86 E 548.90 N 13126.51 E 550.92 N 13302.33 E 548.88 N 13476.97 E 544.42 N 13661.04 E 9489.6 59.03 92.69 9549.7 13833.9 10.76 13833.9 87.8 540.51 N 13823.33 E 'inal S~ation Closure: Distance: 13833.89 ft Az: 87.76 deg. 4, QUALITY CONTROL QUALITY CONTROL REPORT JOB NUMBER' A0697GCE407 TOOL NUMBER - 778 MAXIMUM GYRO TEMPERATURE ' 80.5 C MAXIMUM AMBIENT TEMPERATURE · N/A C MAXIMUM INCLINATION' 67.12 AVERAGE AZIMUTH · 87.76 WIRELINE RF__.ZERO VALUE ' N/A REZERO ERROR / K' N/A CALIBRATION USED FOR FIELD SURVEY' 2026 CALIBRATION USED FOR FINAL SURVEY' PRE JOB MASS BALANCE OFFSET C/i-IECK· POST JOB MASS BALANCE OFFSET CHECK:~ · USED O.O/N/A CONTINUOUS CONDITION OF SHOCK WATCHES UPON ARRIVAL AT RIG · OK 2O26 .00 -.10 UPON COMPLETION OF SURVEY' OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH MWD 17847 60.42 91.90 TVD NORTHING EASTING 9507.47 522 13784 FINAL SURVEY 17850 59.03 92.69 9525.1 542 13779.8 FUNCTION TEST JOB NUMBER: A0697GCE407 6 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 6 2150 17.49 17.49 17.49 17.49 17.49 17.49 AZIMUTH M.D. ft 1 2 3 4 5 6 2150 82.44 82.42 82.39 82.20 82.36 82.30 5. EQUIPMENT AND CHRONOLOGICAL REPORT / EQUIPMENT REPORT JOB NUMBER: A0697GCE407 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 778 GYRO SECTION DATA SECTION POWER SECTION A0169 C0111 C0112 COMPUTER A0222 POWER SUPPLY PRINTER A0079 INTERFACE A0143 A0085 BACKUP TOOL No. 777 GYRO SECTION DATA SECTION POWER SECTION A0168 C0089 C0086 COMPUTER A0349 POWER SUPPLY A0107 PRINTER A0029 INTERFACE A0055 WIRELINE COMPANY: CABLE SIZE: 3/8" SCHLUMBERGER RUNNING GEAR 3.375" SCHLUMBERGER HOUSING IN COMBINATION W/USIT I TOTAL LENGTH: 40.0 FEET MAXIMUM O.D.: 5.5 INCHES TOTAL WEIGHT OF TOOL: 400 POUNDS CHRONOLOGICAL REPORT JOB NUMBER · A0697GCE407 FRIDAY, 06/06/97- 12:00 ALERTED 14:20 TO SLOPE 16:30 ARRIVE ATLAS, CHECK TOOLS, O.K. SATURDAY,06/07/97- 10:00 CHECK TOOLS, STANDBY SUNDAY, 06/08/97 10:00 CHECK TOOLS STANDBY MONDAY, 06/09/97 15:00 16:00 18:00 18:45 20:00 23:45 TO LOCATION ARRIVE LOCATION t MU TOOL RU SCHLUMBERGER PU TOOL, RIH SURVEY CONTINUOUS TO 17900' TUESDAY, 06/10/97 02:45 05:45 06:30 07:15 11:45 14:00 19:45 RUN GR/USIT SURVEY OUT, CONTINUOUS LD TOOL RETURN TO ATLAS PROCESS SURVEY/CHECK TOOL RETURN TO POOL 7 W~ITH RESULTS. FLY TO ANCHORAGE RECEIVED ~' f7 f' ~_,,, i 6 199T Gas Oor)s uu..r)~ssio. ,anr. h~ra..ge, , . CONTENTS JOB NUMBER :A0597GCE394 '1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT 1. DISCUSSION, SURVEY CERTIFICATION SHEET DISCUSSION JOB NUMBER' A0597GCE394 Tool 772 was run in WELL# NK-25 on SCHLUMBERGER 3/8" wireline inside drill pipe. The survey was run without problems. SURVEY CERTIFICATION SHEET JOB NUMBER: A0597GCE394 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the odginal data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER 2. SURVEY DETAILS SURVEY DETAILS JOB NUMBER: A0597GCE394 CLIENT: B.P. EXPLORATION RIG: SCHLUMBERGER LOCATION: WELL: NIAKUK FIELD, ALASKA NK-25 LATITUDE: 70.333 N LONGITUDE: 148.2W SURVEY DATE: SURVEY TYPE : 05, MAY 1997 GYRO MULTISHOT IN 5.5" DRILL PIPE DEPTH REFERENCE: 60.0' MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 8800' SURVEY TIED ONTO: NA SURVEY INTERVAL: 0-8800' APl NUMBER: 050-029-22760 TARGET DIRECTION: 87.65 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD 3. OUTRUN SURVEY LISTING A Gyroda t a D i re c t i onal Survey for B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA Job Number: A0597GCE394 Run Date: 5-May-97 11:50:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.333000 deg. N Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 87.650 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i r e c t i ona i Survey ~.P. EXPLORATION ~IAKUK FIELD, WELL NO. NK-25 ~ORTH SLOPE, ALASKA Iob Number: A0597GCE394 Page ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL C O O R D I N A T E S feet 0 100 200 300 4O0 .0 .0 .0 .0 .0 0.00 0.00 0.0 .33 136.13 100.0 .61 167.12 200.0 1.02 162.03 300.0 1.37 161.09 400.0 0.0 .2 .5 .8 1.4 .00 0.0 0.0 .33 .3 136.1 .37 1.1 151.1 .42 2.5 158.5 .35 4.6 159.8 0.00 N 0.00 E .21 S .20 E .93 S .51 E 2.30 S .91 E 4.28 S 1.57 E 5OO 599 699 798 900 .0 .0 .0 .0 .0 1.15 146.04 499.9 1.12 123.77 598.9 1.14 103.39 698.9 1.36 90.01 797.9 2.16 86.00 899.8 2.3 3.6 5.3 7.4 10.6 .39 6.7 158.0 .45 8.5 153.0 .40 10.1 146.0 .37 11.6 137.8 .79 13.8 127.8 6.25 S 2.52 E 7.61 S 3.89 E 8.39 S 5.67 E 8.62 S 7.80 E 8.48 S 10.94 E 999 1099 1198 1299 1399 .0 .0 .0 .0 .0 2.28 82.31 998.8 2.34 83.86 1098.7 2.35 81.54 1197.6 2.54 81.61 1298.5 3.40 81.70 1398.4 14.4 18.4 22.5 26.7 31.9 i18 16.8 118.8 .09 20.2 112.1 .10 23.8 107.3 .19 27.8 103.4 .86 32.7 100.1 8.09 S 14.75 E 7.61 S 18.75 E 7.09 S 22.77 E 6.46 S 27.03 E 5.71 S 32.17 E 1499 1599 1699 1797 1899 .0 .0 .0 .0 .0 4.38 83.70 1498.1 5.35 83.76 1597.8 5.84 83.13 1697.3 6.45 81.86 1794.7 8.40 85.05 1895.9 38.7 47.1 56.9 67.3 80.5 .99 39.2 97.1 .97 47.5 94.8 .49 57.1 92.8 .64 67.4 91.2 .96 80.5 90.0 4.86 S 38.91 E 3.94 S 47.34 E 2.82 S 57.03 E 1.44 S 67.43 E .01 N 80.53 E 2104.0 2200.0 2300.0 2400.0 2500.0 16.07 82.27 2096.1 18.46 81.97 2187.7 21.71 82.30 2281.6 25.10 82.15 2373.4 28.14 81.94 2462.8 123.7 152.1 186.3 225.8 270.4 3.75 123.7 87.6 2.50 152.1 86.6 3.25 186.4 85.8 3.39 226.0 85.2 3.04 270.8 84.6 5.13 N 123.63 E 9.04 N 151.85 E 13.73 N 185.87 E 19.11 N 225.22 E 25.31 N 269.60 E A Gyrodata D B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA Job Number: A0597GCE394 i re c t i ona 1 Survey Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2600.0 2700.0 2800.0 2900.0 3000.0 31.37 80.76 2549.6 34.51 80.57 2633.5 38.10 81.61 2714.1 40.14 82.00 2791.7 42.31 83.02 2866.9 319.7 373.7 432.5 495.3 560.9 3.28 320.3 84.1 3.15 374.6 83.6 3.64 433.8 83.3 2.05 496.8 83.1 2.28 562.7 83.0 32.79 N 318.65 E 41.61 N 372.29 E 50.76 N 430.78 E 59.75 N 493.23 E 68.32 N 558.56 E 310.0 3200.0 3300.0 3400.0 3500.0 44.44 84.35 2939.5 46 . 07 84 . 94 3009 . 9 49.20 84.98 3077.3 51.06 84.74 3141.4 52.64 84.74 3203.2 629.4 700.3 774.1 850.8 929.3 2.31 631.4 83.1 1.68 702.4 83.3 3.13 776.2 83.4 1.86 853.0 83.5 1.59 931.6 83.6 75.85 N 626.82 E 82.48 N 697.53 E 88.97 N 771.12 E 95.85 N 847.56 E 103.06 N 925.86 E 3600.0 3700.0 3800.0 3900.0 4000.0 54.97 84.03 3262.2 57.48 83.80 3317.8 60.33 82.88 3369.5 62.99 83.73 3416.9 64.49 85.00 3461.2 1009 1092 1178 1266 1355 .9 .8 .2 .0 .5 2.40 1012.3 83.7 2.51 1095.4 83.7 2.96 1181.0 83.7 2.76 1269.0 83.7 1.89 1358.7 83.7 110.97 N 119.78 N 129.72 N 139.97 N 148.77 N 1006.18 E 1088.82 E 1173.87 E 1261.27 E 1350.52 E 4100.0 4200.0 4300.0 4400.0 4500.0 64.25 84.75 3504.4 62.71 82.67 3549.1 62.14 82.38 3595.4 62.40 82.16 3641.9 61.61 82.14 3688.8 1445 1534 1623 1711 1799 .5 .8 .1 .2 .1 .33 1448.8 83.8 2.41 1538.3 83.8 .63 1626.9 83.7 .33 1715.4 83.6 .79 1803.7 83.6 156.82 N 166.61 N 178.13 N 190.04 N 202.10 N 1440.32 E 1529.25 E 1617.14 E 1704.85 E 1792.32 E 4600.0 4700.0 4800.0 4900.0 5000.0 61.94 81.80 3736.1 63.01 81.74 3782.3 64.89 81.70 3826.2 65.46 80.67 3868.2 65.39 80.01 3909.8 1886.8 1975.0 2064.4 2154.5 2244.7 .44 1891.8 83.5 1.07 1980.4 83.4 1.88 2070.2 83.3 1.09 2160.9 83.3 .61 2251.7 83.1 214.41 N 227.10 N 240.03 N 253.94 N 269.20 N 1879.57 E 1967.34 E 2056.24 E 2145.93 E 2235.58 E A Gyrodat a D i re c t i ona i Survey ~.P. EXPLORATION ~IAKUK FIELD, WELL NO. NK-25 ~ORTH SLOPE, ALASKA ~ob Number: A0597GCE394 Page ~EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5100.0 64.90 80.02 3951.8 5200.0 64.94 81.61 3994.2 5300.0 63.90 82.42 4037.4 5400.0 64.59 84.62 4080.9 5500.0 65.54 86.53 4123.0 2334.7 2424.6 2514.4 2604.2 2694.8 .49 2342.3 83.0 1.44 2432.8 82.9 1.27 2523.0 82.9 2.11 2613.1 82.9 1.97 2703.7 83.0 284.94 N 299.40 N 311.93 N 322.09 N 329.08 N 2324.94 E 2414.35 E 2503.67 E 2593.16 E 2683.56 E 5600.0 65.80 86.63 4164.2 5700.0 65.46 86.68 4205.5 5800.0 64.51 86.45 4247.8 5900.0 64.89 86.37 4290.5 6000.0 65.10 86.43 4332.8 2785.9 2877.0 2967.6 3058.0 3148.6 .27 2794.6 83.1 .34 2885.5 83.2 .98 2976.0 83.3 .39 3066.3 83.4 .21 3156.8 83.5 334.51 N 339.82 N 345.24 N 350.90 N 356.60 N 2774.51 E 2865.45 E 2955.91 E 3046.14 E 3136.58 E 6100.0 64.52 86.21 4375.3 6200.0 64.05 86.47 4418.7 6300.0 65.53 86.70 4461.3 6400.0 65.38 86.84 4502.9 6500.0 65.54 86.79 4544.4 3239.0 3329.1 3419.6 3510.5 3601.5 .62 3247.2 83.6 .52 3337.2 83.7 .49 3427.5 83.7 .20 3518.4 83.8 .17 3609.2 83.9 362.41 N 368.16 N 373.55 N 378.68 N 383.73 N 3226.88 E 3316.80 E 3407.11 E 3497.92 E 3588.75 E 6600.0 65.40 86.56 4585.9 6700.0 64.85 86.63 4628.0 6800.0 64.95 86.56 4670.4 6900.0 64.65 86.75 4713.0 7000.0 64.99 86.72 4755.5 3692.4 3783.1 3873.7 3964.1 4054.6 .25 3700.1 84.0 .55 3790.7 84.0 .11 3881.2 84.1 .34 3971.6 84.1 .34 4062.0 84.2 389.01 N 394.40 N 399.78 N 405.07 N 410.22 N 3679.57 E 3770.14 E 3860.54 E 3950.86 E 4041.21 E 7100.0 64.78 86.56 4798.0 7200.0 64.24 86.60 4841.0 7300.0 64.10 86.55 4884.6 7400.0 63.82 86.24 4928.5 7500.0 63.76 86.56 4972.6 4145.2 4235.4 4325.4 4415.2 4504.9 .25 4152.4 84.3 .54 4242.6 84.3 .15 4332.6 84.4 .39 4422.4 84.4 .29 4512.0 84.4 415.53 N 420.91 N 426.29 N 431.93 N 437.57 N 4131.60 E 4221.71 E 4311.56 E 4401.23 E 4490.77 E A Gyrodat a Di re ct ional ~.P. EXPLORATION ~IAKUK FIELD, WELL NO. NK-25 ~ORTH SLOPE, ALASKA Iob Number: A0597GCE394 4EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. 7600.0 63.91 86.70 5016.7 7700.0 63.35 86.97 5061.1 7800.0 63.86 87.00 5105.6 7900.0 63.13 87.02 5150.2 8000.0 62.79 87.23 5195.7 4594 4684 4773 4863 4952 .7 .3 .8 .3 .4 .20 4601.7 84.5 .61 4691.2 84.5 .51 4780.7 84.6 .73 4870.2 84.6 .39 4959.1 84.7 8100.0 62.46 87.21 5241.7 8200.0 63.44 86.61 5287.1 8300.0 64.87 86.78 5330.7 8400.0 64.80 86.82 5373.3 8500.0 64.57 86.51 5416.0 5041.2 5130.2 5220.2 5310.7 5401.1 33 5047.9 84.7 11 5136.9 84.7 44 5226.8 84.8 08 5317.2 84.8 35 5407.6 84.8 8600.0 64.76 86.62 5458.8 8700.0 65.54 88.21 5500.8 8800.0 65.63 88.01 5542.2 5491.5 . 5582.2 1. 5673.3 . 21 5497.9 84.9 64 5588.6 84.9 20 5679.5 85.0 Survey HORIZONTAL COORD I NATES feet 442.85 N 447.80 N 452.51 N 457.18 N 461.65 N 465.96 N 470.76 N 475.95 N 481.00 N 486.25 N 491.66 N 495.75 N 498.76 N 4580.37 E 4669.83 E 4759.28 E 4848.65 E 4937.61 E 5026.31 E 5115.24 E 5205.08 E 5295.45 E 5385.69 E 5475.91 E 5566.56 E 5657.56 E Page Final Station Closure: Distance: 5679.50 ft Az: 84.96 deg. A Gyroda t a D i r e c t i ona i Survey for B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA Job Number: SUB394B Run Date: 5-May-97 11:30:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.333000 deg. N Sub-sea Correction from Vertical Reference: 60 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 87.650 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA Job Number: SUB394B Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet -60.0 0.00 0.00 0.0 100.0 .50 154.73 160.0 200.0 .86 164.06 260.0 300.0 1.23 161.46 360.0 400.0 1.24 152.05 460.0 0.0 .4 .7 1.2 1.9 0.00 0.0 0.0 .35 1.1 145.1 .40 2.5 155.5 .37 4.6 159.3 .38 6.7 158.8 0.0N 0.0E .6S .4E 1.8S .8E 3.5S 1.3E 5.5S 2.1E 500.0 1.14 132.53 560.0 600.0 1.13 111.32 660.0 700.0 1.28 95.13 760.0 800.0 1.85 87.57 860.0 900.0 2.23 83.76 960.0 3.1 4.6 6.6 9.4 12.9 .42 8.5 155.0 .42 10.1 148.7 .38 11.6 140.9 .63 13.8 131.7 .42 16.8 122.3 7.1S 3.3E 8.1S 5.0E 8.5S 7.0E 8.5S 9.7E 8.2S 13.3E 1000.0 2.32 83.26 1060.0 1100.0 2.35 82.42 1160.0 1200.0 2.47 81.59 1260.0 1300.0 3.07 81.67 1360.0 1400.0 4.01 82.94 1460.0 16.9 20.9 25.1 29.9 36.1 .13 20.2 114.7 .09 23.8 109.1 .16 27.8 104.9 .60 32.7 101.4 .94 39.2 98.2 7.8 S 17.2 E 7.3 S 21.2 E 6.7 S 25.4 E 6.0 S 30.2 E 5.2 S 36.3 E 1500.0 4.99 83.74 1560.0 1600.0 5.66 83.37 1660.0 1700.0 6.23 82.32 1760.0 1800.0 7.71 83.92 1860.0 1900.0 10.86 84.16 1960.0 43.9 53.2 63.6 75.8 94.3 .98 47.5 95.7 .67 57.1 93.6 .58 67.4 91.8 .49 80.5 90.4 .53 123.7 89.2 4.3 S 44.1 E 3.2 S 53.4 E 1.9 S 63.7 E .5 N 75.9 E 1.6 N 94.3 E 2000.0 14.69 82.77 2060.0 2100.0 17.74 82.06 2160.0 2200.0 20.96 82.23 2260.0 2300.0 24.61 82.17 2360.0 2400.0 28.05 81.95 2460.0 115.9 143.5 178.4 220.0 269.0 3.43 123.7 88.1 2.88 152.1 86.9 3.07 186.4 86.0 3.37 226.0 85.2 3.05 270.8 84.7 4.2 N 115.9 E 7.9 N 143.3 E 12.6 N 178.0 E 18.3 N 219.5 E 25.1 N 268.2 E A Gyroda t a D i re c t i ona i Survey ~.P. EXPLORATION ~IAKUK FIELD, WELL NO. ~ORTH SLOPE, ALASKA Iob Number: SUB394B NK-25 Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 2500.0 2600.0 2700.0 2800.0 2900.0 31.76 80.74 2560.0 35.69 80.91 2660.0 39.31 81.84 2760.0 42.11 82.93 2860.0 44.91 84.52 2960.0 326.4 3.26 374.6 84.1 393.0 3.31 433.8 83.5 469.7 2.70 496.8 83.2 554.9 2.26 562.7 83.0 650.0 2.13 702.4 83.1 33.9 N 325.3 E 44.6 N 391.5 E 56.1 N 467.8 E 67.5 N 552.6 E 77.8 N 647.4 E 3000.0 3100.0 3200.0 3300.0 3400.0 48.40 84.97 3060.0 51.53 84.74 310.0 54.88 84.06 3260.0 59.81 83.05 3360.0 64.45 84.97 3460.0 755.1 2.76 77'6.2 83.4 874.4 1.78 931.6 83.6 1006.8 2.37 1012.3 83.7 1162.6 2.88 1181.0 83.7 1353.1 1.91 1358.7 83.7 87.3 N 752.2 E 98.0 N 871.1 E 110.7 N 1003.1 E 127.9 N 1158.3 E 148.5 N 1348.2 E 3500.0 3600.0 3700.0 3800.0 3900.0 62.58 82.60 3560.0 62.10 82.15 3660.0 62.49 81.77 3760.0 65.35 80.87 3860.0 64.91 80.32 3960.0 1555.6 1745.1 1932.3 2136.9 2352.0 1.99 1626.9 83.8 .51 1803.7 83.6 .77 1980.4 83.5 1.25 2160.9 83.3 .67 2432.8 83.0 169.3 N 1550.0 E 194.7 N 1738.6 E 221.0 N 1924.9 E 251.2 N 2128.4 E 287.7 N 2342.1 E 4000.0 4100.0 4200.0 4300.0 4400.0 64.26 83.56 4060.0 65.77 86.62 4160.0 64.62 86.43 4260.0 64.73 86.29 4360.0 65.48 86.69 4460.0 2561.1 2776.6 2993.4 3206.4 3416.7 1.71 2613.1 82.9 .45 2794.6 83.1 .81 3066.3 83.4 .47 3247.2 83.6 1.46 3427.5 83.7 317.2 N 2550.2 E 333.9 N 2765.2 E 346.9 N 2981.7 E 360.3 N 3194.3 E 373.4 N 3404.3 E 4500.0 4600.0 4700.0 4800.0 4900.0 65.49 86.70 4560.0 64.92 86.58 4660.0 64.96 86.71 4760.0 64.18 86.58 4860.0 63.78 86.47 4960.0 3635.6 3851.5 4064.2 4274.7 4479.3 .20 3700.1 83.9 .22 3881.2 84.1 .33 4152.4 84.2 .37 4332.6 84.3 .32 4512.0 84.4 385.7 N 3622.9 E 398.5 N 3838.4 E 410.8 N 4050.7 E 423.3 N 4260.9 E 436.0 N 4465.2 E A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-25 NORTH SLOPE, ALASKA Job Number: SUB394B Page SUBSEA I N L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG CLOSURE HORIZONTAL COORDINATES SEVERITY DIST. AZIMUTH deg./ feet deg. feet 100 ft. 5000.0 63.37 86.96 5060.0 4682.0 5100.0 63.06 87.06 5160.0 4882.5 5200.0 62.85 86.97 5260.0 5077.1 5300.0 64.82 86.81 5360.0 5282.5 5400.0 64.78 86.67 5460.0 5494.1 .60 4691.2 84.5 447.7 N 4667.5 E .65 4959.1 84.6 458.1 N 4867.8 E .65 5136.9 84.7 467.9 N 5062.2 E .50 5317.2 84.8 479.4 N 5267.3 E .25 5588.6 84.9 491.8 N 5478.5 E 5482 . 2 65 . 63 88 . 01 5542 . 2 5673 . 3 .20 5679.5 85.0 498.8 N 5657.6 E Final Station Closure: Distance: 5679.50 ft Az: 84.96 deg. 4. QUALITY CONTROL QUALITY CONTROL REPORT JOB NUMBER: A0597GCE394 TOOL NUMBER: 772 MAXIMUM GYRO TEMPERATURE: 76.09 C MAXIMUM AMBIENT TEMPERATURE: 43.5 C MAXIMUM INCLINATION: 65.63 AVERAGE AZIMUTH: 84.96 WIRELINE REZERO VALUE: N/A REZERO ERROR / K: N/A CALIBRATION USED FOR FIELD SURVEY: 1926 CALIBRATION USED FOR FINAL SURVEY: 1926 PRE JOB MASS BALANCE OFFSET CHECK: .20 POST JOB MASS BALANCE OFFSET CHECK]: USED O.O/N/A CONTINUOUS CONDITION OF SHOCK WATCHES .30 UPON ARRIVAL AT RIG: OFF UPON COMPLETION OF SURVEY: OFF UPON RETURN TO ATLAS OFF BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING MWD 8804 65.69 87.4 5547 431 5667 FINAL SURVEY 8800 65.64 88.01 5542 499 5657 FUNCTION TEST JOB NUMBER: A0597GCE394 6 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 6 2098 15.95 15.95 15.95 15.95 15.95 15.95 AZIMUTH M.D. ft 1 2 3 4 5 6 2098 82.20 82.24 82.19 82.16 82.25 82.18 5. EQUIPMENT AND CHRONOLOGICAL REPORT EQUIPMENT REPORT JOB NUMBER: A0597GCE394 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 772 GYRO SECTION DATA SECTION POWER SECTION BACKUP TOOL No. 758 GYRO SECTION DATA SECTION POWER SECTION A0162 C0100 C0040 A0147 C0089 C0086 COMPUTER A0222 POWER SUPPLY PRINTER A0079 INTERFACE A0087 COMPUTER A0349 POWER SUPPLY PRINTER A0029 INTERFACE A0055 A0085 A0107 WIRELINE COMPANY: CABLE SIZE: 3/8" SCHLUMBERGER RUNNING GEAR 2.25" HOUSING W/CENTRALIZERS AND ECCENTRIC BAR I TOTAL LENGTH: 36.0 FEET MAXIMUM O.D.: 2.25 INCHES TOTAL WEIGHT OF TOOL: 200 POUNDS CHRONOLOGICAL REPORT JOB NUMBER' AO597GCE394 FRIDAY, 05/02/97- FINISH 2F-17, CHECK TOOLS O.K.-STAND BY FOR NK-25 SATURDAY, 05/03/97- CHECK TOOLS, STANDBY SUNDAY, 05~04~97-CHECK TOOLS STANDBY MONDAY, 05/05/97 04:00 05:00 08:00 10:30 11:00 11:30 11:50 14:15 16:30 17:30 21:15 22:00 TO LOCATION ARRIVE LOCATION MU TOOL RU SCHLUMBERGER PU TOOL MU PUMP DOWN SUB RIH, SURVEY CONTINUOUS TO 8800' SURVEY OUT LD TOOL RETURN TO ATLAS PROCESS SURVEY/CHECK TOOL RETURN TO POOL 7 WITH RESULTS. TUESDAY, 05/06/97 00:30 CHECK TOOLS FOR MPF-50, LATER TODAY. ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 15, 1997 Mr. D. W. Johnson Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Lisburne Well NK-25 Notification of Name Revision to L6-25 Dear Mr. Johnston: This letter is to notify and document with the Commission that Lisburne Well NK-25 (API 50-029-22760-00) is being renamed to L6-25. This revision is being made to allow tracking of the well with the existing LDGS automation system used for Lisburne and The Greater Point McIntyre Area. No change in the API number is required. ~ ~ _. ~ If~/~~s or comments, please contact me at 263-4851. M. B¥own Development Engineer MB/ab CC: K. Hagedorn, Exxon R. W. Janes, BPX S/P/IO/O0 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11326 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 9/5/97 Field: Greater Point Mclntyre Area All Lisburne Wells (Incl NK-25 &NK-26) Floppy Well Job # Log Description Date BL RF Sepia Disk :L6-25 .~ NJ~." g~" 973,,98 PDCGR ;~'(~(~/ 97071'2 .... i ..... ,, SIGNED: SEP 0 5 10 7 DATE: Anch0r~e Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11309 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area All Lisburne Wells (Incl NK-25 &NK-26) 9/2/97 Floppy Well Job # Log Description Date BL RF Sepia Disk ..-=~ I ~=~ [..c/.~¢=s ~°~0~I ~ 7o~ .... *REISSUED TAPE TO INCLUDE DT FROM RUN ~1 THAT WAs ACQUIRED UP'INTO CASING. ..... "1 SIGNED: SEP 0 5 1997' DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. Alaska 0{I & Gas Cons. Commi~km Anchor-4e GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11187 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area All Lisburne Wells (Incl NK-25 &NK-26) Floppy Well Job # Log Description Date BL RF Sepia Disk 7/25/97 NK-25 ~'7-~ 97267 BHC/NGT/FMS ~ ~O ::'J";~, 970609 1 NK-25 . 97267 NGT 970601 I 1 NK-25 97267 NGT 970609 I 1 NK-25 97267 FMS 970601 I 1 NK-25 97267 BHC 970602 I 1 i " NK-25 97267 NGT/USIT-NGS 970609 1 1 NK-25 97267 ULTRASONIC CEMENT LOG/USIT-NGS 970609 I 1 NK-25 ' / 97267 RFT 970602 I I Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. dLiL 1 1997 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11112 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area All Lisburne Wells (Incl NK-25 &NK-26) .-'6¢.2,5t 97 LIS Well Job # Log Description Date BL RF Sepia Tape NK-25 97245 MWD GR/CDR/RAB/ADN 970601 1 N___~- 25- ....... --.-- -._9.7_2AS~...13AI~ ...... 970601 ____._t----------~----'--'T'' .~ K-25 97245 RAB TVD ~~~ ~~~~ 1 1 NK-25 97245 ADN ~~~~ ~ I 1 :~K~5.~ .... ~ 97245 - ~-T~ 970601 1~~~ .... I . ~ ,". ~ "." '/' / " , ~ "' ,..~ ../ ' , f"~;.' ,,. /' ' '1 i,.~r, ~ .......... I .f' ' / ,,: : t ./.,~ ~ .; ~' ¢. .'. ~. ~. "" '~[', ( x'/ - ,~ ~ ,,~/. (. ~ ~'. S I G N E D: (~~- ~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED ,.t!..11.. 11 t991 Gas Cons. Cor,' missior Anc~0rage GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN' Sherrie NO. 11112 Company: Field: 6/25/97 Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area All Lisburne Wells (Incl NK-25 &NK-26) LIS Well Job # Log Description Date BL RF Sepia Tape NK-25;.~ ~7'7 t (~;~ 97245 MWD GR/CDR/RABIADN 970601 1 NK-25 97245 RAB 970601 1 1 NK-25 97245 RAB TVD 970601 I 1 NK-25 97245 ADN 970601 I 1 NK-25 97245 ADN TVD 970601 I I S I G N E D' _~_~~. DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ,JUN 26 1997 A~c~orag¢ MEMORANDUM TO: David Jo~n, Chairma'-[~;,~~ THRU: State of Alaska Alaska Oil and Gas Conservation Commission DATE: May 3, 1997 Blair Wondzell, $/? P. !. Supervisor,,~ FROM: Bobby Fo~;r-~,/~-~ SUBJECT: Petroleum ins~octor FILE NO: AZ11ECEE.doc BOPE Test - Pool 7 BPX- Niakuk - NK-25 PTD # 97-0O68 Saturday, May 3,1997: ! traveled this date to BPX's Niakuk drill pad and witnessed the BOPE test on Pool rig 7 drilling NK-25. As the attached AOGCC BOPE Test Report shows there were no failures. The location was tight but orderly and equipment was stored properly. The rig was fairly clean due to work being performed on the drawworks. All equipment seemed to be in good working order. Summary: I witnessed the BOPE test on Pool rig 7 drilling BPX well NK-25. Pool 7 - $13197 - Test time 3 hours - no failures. Attachment: AZ1 IECEE.XLS X Unclassified Confidential (Unclassified if doc. removed ) STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover:~ Drlg Contractor: POOL Rig No. Operator: BP Exploratfon Well Name: Niakuk NK-25 Casing Size: 13 3/8" Set (~ 7, 733' Test: Initial X Weekly Other MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location OK Standing Order Posted YES 5/3/97 DATE: 7 PTD # 97-0068 Rig Ph.# 659-4815 Rep.: Les Peak Rig Rep.: Jim Davidson Location: Sec. 36 T. 12 N R. 15 E Meridian UM ,,, Test FLOOR SAFETY VALVES: Quan. Pressure Well Sign YES Upper Kelly / IBOP 1 i 250/5,~ Drl. Rig OK Lower Kelly / IBOP 1.I 250/5,0~ Hazard Sec. YES Ball Type 1 250/5,000 Inside BOP 1 250/5,000 P/F P P P P BOP STACK: Quan. Annular Preventer 1 Pipe Rams Lower Pipe Rams Blind Rams 1 Choke Ln. Valves HCR Valves Kill Line Valves Check Valve I 250/5,000 P I 250/5,000 P Test Press. P/F Test 250/3500 P Pressure 250,/5,000 1 250/5,000 2 250/5,000 1 250/5,~ N/A P P P P N/A MUD SYSTEM: ~/=ual Alarm Trip Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Meth Gas Detector OK OK H2S Gas Detector OK OK CHOKE MANIFOLD: No. Valves 18 No. Flanges 34 Manual Chokes 1 Hydraulic Chokes 2 250/5,~ PIF Funcb'oned P Funclfoned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master. Nitgn. Bti's: ! 1,350 P minutes 34 sec. minutes 12 sec. Yes Remote: Yes Psig. Number of Failures: 0 ,Test Time: 3.0 Hours. Number of valves tested 24 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 I I I REMARKS: GOOD TEST. Distribution: orig-Well File c - Oper./Rig c - Database c - Tdp Rpt File c- Inspector FI-021L (Rev. 12/94) STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: v~,rrtnessed By: AZ11ECEE.XLS BOBBY D. FOSTER TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 April 17, 1997 Steve Shultz Senior Drilling Engineer ARCO Alaska, Inc. ? O Box 196612 Anchorage, AK 99519-6612 Re' Niakuk NK-25 ARCO Alaska. Inc. Permit No 97-68 Sur. Loc.' 1371'NSL, 656'WEL, Sec. 36, T12N, R15E, UM Btmhole Loc: t938'NSL, 1229'WEL, Sec. 33, T12N, R16E, UM Dear Mr. Shultz: Enclosed is the approved application for permit to redrill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance xvith 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3( ~David~. Johnston Chairman__) BY ORDER OF THE COMMISSION dltYenclosures CC: Department of Fish & Game. Habitat Section xv/o encl. Department of Envinornment Conservation w/o encl. .... STATE OF ALASKA ALASKA IJIL AND GAS CONSERVATION corvllwlSSlON PERMIT TO DRILL 20 AAC 25.005 la. Typeofwork I~Drill I-IRedrill Ilb. Typeofwell I-IExploratory I-IStratigraphicTest I~Development Oil [] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone 2.,,,~~,~tl~¢t~~.Name of Operator .,,~//_.,~,,¢,~/.,,~ ~~"/,,r'/~ 5. DatUmplanElevationRTE = 60'(DF or KB) 10. Field and Pool ,~iakek'-tBiH~ I . 3. Address 6. Propertyaesignation ~----~"~,,¢,,~_. ~c;::::¥,~//~?¢~/'/ P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 034634 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1371' NSL, 656' WEL, SEC. 36, T12N, R15E Niakuk At top of productive interval 8. Well Number Number 2S100302630-277 1901' NSL, 2875' WEL, SEC. 33, T12N, R16E NK-25 Attotal depth 9. Approximate spud date Amount $200,000.00 1938' NSL, 1229' WEL, SEC. 33, T12N, R16E 04/24/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028337, 1938'I NK-26, 17' @ 500' MD 2560 18697' MD / 9955' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} Kick Off Depth 1000' Maximum Hole Angle 64.2 o Maximum surface 3550 psig, At total depth (TVD) 9500' / 4500'psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 94# H-40 Weld 80' Surface Surface 80' 80' 260 sx Arctic Set (Approx.) 16" 13-3/8" 68# L-80 Btc 7675' Surface Surface 7715' 5060' 3330 sx PF'E', 880 sx 'G', 50 sx PF'C' 12-1/4" 9-5/8" 47# L-80 Btc-M 17100' Surface Surface 17140' 9160' 740 sx Class 'G' 8-1/2" 7" 29# L-80 Hydril 511 1971' 16990' 9095' 18967' 9955' 400 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface r~V~ Intermediate Production ORIGINAL Liner ~,las.ka 0il & Gas Cons. Perforation depth: measured ~ch0rag.i true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Ske~'~ [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Larry Wolfson, 564-5510 Prepared By Name/Number: Kathy Campoamor,,564-~122 21. I hereby certify that ~oin~lr~ a~ect to the best of my knowledge ~///~/ Signed SteveShultz ~ / ~ ~.,_..1 ~' ~v4.,- ~ Title Senior Drilling Engineer Date , Commission Use Only Permit Number I APl Number Approval Date I See cover letter ¢/~--~'(~2'I 50- d::~2_~ - ~ ~-~ 7~"'4:;:~ ~/2.;..-- t/.-~ "-~lI for other requirements Conditions of Approval: Samples Required [] Yes ~ No Mud Log Required [] Yes _,~ No Hydrogen Sulfide Measures "~¢Y'es [] No Directional Survey Required .,~ Yes [] Ne Required Working Pressure for DOPE [] 2M; [] 3M; ,1~ 5M; [] 10M; [] 15M Other: Original Signea By by order of ti,! Approved By r}Rvifl w ,Inhn.~tnn Commissioner the commission Date~'/ Form 10-401 Rev. 12-01-85 SubmitI ~licate NK-25 (L6-25) Well Plan Summary Surface Location: 1371' FSL 656' FEL Sec 36 T12N R15E Target Location: 1901' FSL 2875' FEL Sec 33 T12N R16E Bottom Hole Location: 1938' FSL 1229' FEL Sec 33 T12N R16E I AFE Number: I I I Estimated Start Date: I 4/24/97 IMD: I 18,697' I ITVD: I Rig: I Pool #7 ~ I Operating days (incl coring): I IKBE: I 60.0' I Type of Well (producer or injector): Well Design (conventional, slimhole, etc.): Producer Conventional / ERD Formation Markers: (all depths RKB) Measured True Vertical Formation Mud Formation Tops Depth, ft Depth, ft Gradient, ppg Weight, ppg Base Permafrost 1,765 1,760 8.551 8.8 SV3/TT4 6,106 4,360 8.551 9.1 SV1/TT6 7,486 4,960 8.551 9.2 Ugnu 8,635 5,460 8.652 9.0 West Sak 11,761 6,820 8.802 9.2 Colville 13,002 7,360 8.80 9.4 Tuffs/Shale Wall 14,887 8,180 9.20 10.13 HRZ 16,220 8,760 9.40 10.43 Alapah C 17,140 9,160 7.904 9.4 Alapah B 17,531 9,330 9.10 9.4 Alapah A 18,018 9,542 9.10 9.4 Logging/Formation Evaluation Program: Surface MWD/GR ......................................................................................Intermediate ~?~i"]~W0~}DT~' ...... ~i[i~'~' i:1'~'i~' ~'~'~ ......................................... ........... FFi~'/i~ii~'ii ........................................... ~'F'i~[;i ........... ~?O"l~'~iq?~iS~i"D'C2Oi~TiS~ ......................... Open Hole: RFT (sampling optional); FMI w/Dipole sonic from TD to 150' tvd above the top Alapah into the HRZ. Cased Hole Logs: TD: Schlumberger CET/CBT; Gyrodata Continuous Gyro Assumed seawater gradient. Formation pressure gradient based on RFT data from NK-17. Mud weight required for wellbore stability. Based on NK-26 pressure build-up~l 1/95. NK-25 (L6-25) Well Plan ~ ~mmary Casing/Tubing Program: (all depths feet RKB) Hole Csg/Tbg Wt/Ft Grade Conn. Length Top Btm Size OD MD/TVD MD/TVD 30" 20" 94# H-40 WLD 80 GL 80/80 16" 13 3/8" 68# L-80 BTC 7675 GL 7715/5060 12 1/4" 9 5/8" 47# L-80 BTC-M 17100 GL 17140/9160 8 1/2" 7" 29# L-80 Hydri1511 1971 16990/9095 18967/9955 N/A 4 1/2" 12.6# L-80 IBT-Mod 16960 GL 17000/9100 Cementing Program Hole Casing Volume~ Type of Cement Properties2 Category Size/Depth Surface First Stage 13 3/8" @ Lead3 Lead Lead 7,715' 1060 sx Permafrost "E" Den 12.0 ppg 410 bbls Yield 2.17 ft 3/dX Water 11.6 gps TT 4.0 hrs Tail4 Tail Tail 880 sx Class "G" w/ Den 15.8 ppg 180 bbls 0.2 % CFR-3, Yield 1.15 ft 3/dX 0.2 % Halad 344 Water 5.0 gps TT 3.5 hrs ....... ............. 5i'i' ii/ ..... ........................... F ' ia ............................................ i; 'ii'a' ............................................. ~ 2270 sx Permafrost "E" Same as above ~ 877 bbls 5 ~ [lgr~ r4/(~ Tail6 Tail Tail 50 sx P-~"~'mafrost "C" Den 15.6 ppg 9 bbls Yield 0.94 ft 3/dX Water 3.5 gps TT 3.5 hrs Intermediate 9 5/8" @ 740 sx7 Class "G" w/ Den 15.8 ppg 17,140 152 bbls 0.2 % CFR-3 Yield 1.15 ft 3/dX 0.2 % Halad 344 Water 5.0 gps 0.1% HR-5 TT 4.0-5.0 hrs Production 7" @ 400 sx8 Class "G" w/ Den 15.6 ppg 21,356' 85 bbls 2.0 gps Latex Yield 1.2 ft 3/dX 0.36 gps 434B Water 3.5 gps 0.05 gps D3 TT Batch mix + 1.0 % Gel 3.5-4.5 hrs 0.4 % CFR-3 0.1% HR-5 Rounded up to the nearest 10 sacks. 2 Thickening time required; actual times should be based on job requirements and lab tests. Open hole volume from top of tail to stage collar + 30% excess. 750' TVD open hole volume + 30% excess + 80' shoe joint. Open hole volume from stage collar to surface + 350% excess + casing capacity to stage collar. No fill criteria--sufficient volume to ensure high strength cement outside of stage collar. 2000' open hole volume (12 1/4" x 9 5/8") + 30% excess + 80' shoe joint. Open hole volume (9.5" x 7") + Liner Lap + 200' above liner top w/DP + 80' shoe joint. 4/8/97 LW NK-25 (L6-25) Well Plan ~,..nmary Mud Program: Viscosity sec gel Surface Hole (Surface-7715'): Spud 8.8-9.6 1200-300 sec I 55-65 I 30-60 I 60-80 [ 8.5-9.0 I Intermediate Hole (7715'-17140'): 8.8-10.4I 10-30 I 10-25 Production Hole (17170'-18967'): 9.4-9.6I 10-20 I 10-20 Mud Disposal Low Solids Non-Dispersed I ~0-~5 I <20 I 9-10 Low Solids Non-Dispersed I <20 I 9- 0 Mud and cuttings will be hauled-off Heald Point and disposed at the appropriate facility. Fluid Loss 12-15 4-8 <4 Directional: KOP: 1000' Begin variable build: 1.0-2.5°/100 ft @ 82.9° azimuth Hole Angle: 64.2° 3,914'-TD; turn to final azimuth--88.6° @ 5,210' Close Approach Minimum Normal Distance--Survey-to-Survey Wells: NK-26 17' @ 500'mwell to be shut-in at SSSV. Survey Program: Surface - 8,800' Single shot MWD surveys; if magnetic interference is detected, take gyro single shots. Surface - 8,800' In-hole reference gyro; run gyro as deep as possible. 8800' - TD MWD surveys Surface - TD Gyro--Gyrodata continuous mode--during completion Drilling Hazards/Risks Background The Lisburne group consist of two carbonate formations--the Wahoo (upper) and Alapah (lower). The Wahoo is the primary reservoir in the Lisburne field, however an unconformity has truncated it in this region. The only Lisburne well to produce from the Alapah is NK-26, which lies about 3400' west of the NK-25 planned location. NK-26 was completed in the Alapah-C and had an initial reservoir pressure of 4400 psi at 9250' ss (9.1 ppg EMW). NK-26 has produced over 1.4 MM STBO and the pressure in the Alapah-C is currently estimated at 3800 psi at 9250' ss (7.9 ppg EMW). h's assumed the formation pressures encountered in NK-25 will be the same as currently estimated in NK-26. The Alapah-C is depleted (7.9 ppg EMW), but the Alapah B and A zones are most likely at original pressure (9.1 ppg EMW). The maximum anticipated surface pressure (MASP) is 3500 psi--based on a gas gradient applied to the original reservoir pressure in the Alapah-B. Lost circulation was encountered after penetrating porous intervals in the Alapah-C while drilling with a 9.9 ppg mud weight. The losses were controlled with high concentrations of LCM. 4/8/97--LW NK-25 (L6-25) Well Plan ~._~nmary H2S NK-26 has tested as high as 18 ppm H2S. Lost Circulation The geological prognosis calls for drilling from the HRZ into the Alapah-C horizon. It's anticipated the top of the C zone will be fairly fight, however if there is any porosity enhancement in the upper section, lost circulation may occur. To minimize the chances of this occurring, the well plan calls for setting the 9 5/8" casing through the HRZ into the top of the Alapah formation. This will allow for drilling the HRZ with an adequate mud weight (_+10.4 ppg) for wellbore stability, but lowering the mud weight (_+9.3 ppg) prior to drilling the porous intervals in the Alapah-C. In addition the mud will be pretreated with sized calcium carbonate to act as bridging agents. Unmapped low-throw faults may be present and may cause lost circulation. Differential Reservoir Pressure Differential reservoir pressures are likely to be encountered. The Alapah B and A zones are assumed to be at original pressure--9.1 ppg EMW, and a _+750 psi differential pressure between these and the Alapah-C is likely. Close Approaches NK-26 passes SSD's flowing well criteria, but the allowable deviation from the plan is less than 8' at 500' md. However, if NK-26 is shut-in, the allowable deviation increases to 13'. Therefore, the well will be shut-in at the SSSV, until surface casing is set. Well Control: Well control equipment consisting of 5000 psi WP pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. Contacts: Office Home Pager SSD Drilling Superintendent Adrian Clark 564-4720 345-9066 275-1779 Senior Drilling Engineer Steve Shultz 564-5405 373-1657 275-9459 Operations Drlg Engr Larry Wolfson1 564-5510 345-6624 275-1711 Asset Drilling Engineer Dan Stone 654-4002 348-0239 1 Primary Contact 4/8/97--LW NK-25 (L6-25) Well Plan S .... anary 5 o o . . . 7. 8. 9. 10. 11. 12. 13. Operations Summary MIRU drilling rig. NU and function test diverter. Spud well and drill 16" hole to 1,800' and kick off and build angle to 64.2° at a 82.9° azimuth per attached directional program. Hold tangent angle to casing setting depth at 7715' Run and cement 13 3/8" casing in place bring cement to surface. Test casing to 3000 psi for 30 minutes. Install and test BOP to 5000 psi. Note AOGCC witness or waiver on the morning report. M/U 12 1/4" BHA and drill 20' of new hole and perform LOT. Drill 12 1/4" hole to the bottom of 17,140'. Run and cement 9 5/8" casing. Test casing to 3000 psi for 10 minutes. Test BOP to 5000 psi. Note AOGCC witness or waiver on the morning report. P/U 8 1/2" BHA, drill 10' new hole and perform LOT. Drill to TD @ 18,697'. Run open hole logs. Run and cement 7" production liner. Run cased hole logs. Run 4 1/2" completion. Set packer and test tubing to 4000 psi; annulus to 3500 psi. Freeze protect well. ND BOP and NU tree assembly. Test tree assembly to 5000 psi. Secure well and release rig. Turn the well over to Production for wireline perforating. Attachments · Directional Plan 4/8/97--LW Well .......... ~_~-25 (911) Field ........ :~,akuk, Main Pad Computation..: Minimum Curvature Units ........ : FEET Surface Lat,.: 70,34738450~N Surface Long.: 148,19843206 W Anadrill S=hlumkerger Alaska District lll~'East 80th Avenue Anchorage, AK 99618 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Legal Description Surface ...... : 1371 FSL 656 FEL S36 T12N R15E UM Target ....... : 1901 FSL 2875 FEL $33 T12N R16E uM BHL .......... : 1938 FSL 1229 FEL $33 T12N R16E UM LOCATIONS - ALASKA Zone: 4 X-Coord YzCoord 72i905.28 5979916,.27 735100.00 59~0850.00 736742,94 S980938.33 PROPOSED WELL PROFILE STATION MEASURED INCLN DIRECTION VERTICAL-DEPTHS sEcTIoN Prepared ..... : 13 Mar 1997 Vert sect az.: 87.65 KB elevation.: 60.00 ft Magnetic Dcln: +28.832 (E) Scale Factor.: 0.99995594 Convergence..: +1. 69668819 ,<,: .,. r'' IL AKA-DFC 'TY PLAN FF:A'. . NOT APPROVED FOR. E>-(FcI ...... JTiON PLAN COORDINATES-FROM ALASKA Zone 4 IDENTIFICATION DEPTH ANGLE AZIMUTH TVD SUB-SEA, DEPART WELLHEAD X Y KB KOP BUILD 1/100 BUILD 1.5/100 0.00 0.00 1000.00 '0.00 1100.00 1.00 i200.00 2.00 1300.00 3.50 0.00 82.94 82.94 82.94 82.94 0.00 -60.00 0,00 1000,00 940.00 0.00 1099~99 1039.99 0.87 . . 1199.96 1139.96 3.48 1299.84 1239.84 8.26 0,00 N 0.00 E 721905.28 5979916.27 0.00 N 0.00 E 721905.28 5979916.27 0,11 N ,0.87 B 721906.14 5979916.40 0.43 N 3.46 E 721908.73 5979916.80 1.02 N 8.23 E 721913.47 5979917,53 TOOL DL/ FACE 100 83R 0.00 B3R 0.00 B3R 1.00 83R 1.00 83R 1.50 BUILD 2/100 BUILD 2.5/100 END 2.5/100 BUILD 1400.00 ·5.00 1500.00 '7.00 1600.00 9.00 1700~00 11.50 1715.'00 11,87 '82.94 82.94 82.94 82.94 1399.56 "1339.56 15.65 1499.01 1439.01 26,06 1598~03 1538~03 39,93 1696,43 1636.43~ 57.67 171i.12 1651.12 60.69 1,93 N 15.58 E 721920.80 5979918.66 83R 1.50 3,21 N 25.95 E 721931.13 5979920.25 HS 2.00 4.92 N 39.76 E 721944.88 5979922.37 HS 2.00 7.11 N 57.42 E 721962.46 5979925.07 HS 2.50 7.48 N 60,4~ E 721965.47 5979925.54 HS 2.50 BASE PERMAFROST BUILD 2.5/100 1764.95 11.87 i820.00 ' 1!.87 82.94 82.94 1760.00 1700.00 1813.87 1753.87 70.94 8.74 N '70.64 E 82.23 10.13 N 81.88 E 721975.63 5979927.10 HS 0.00 721986.82 5979928.82 HS 0.00 I ',~ I o o ), (Anadrill (c)97 NK25P11'3.0C 5:12 PM PI STATION IDEIT~I ~I CATION END 2.5/100 B~JILD CU?.VE 1/loo PROPOSED WELL ~ROF[LE MEASURED INCLN DIRECTION DEPTH ANGLE AZIMUTH 1900.00 13.88 ' 82.'94 2000.00 16.38 82.94 2100.00 18.88 82:94 2200,00 21.38 82.94 2300.00 23.88 82.94 2400.00 26.38 82.94 2500.00 28.88 82.94 2600.00 31.38 82.94 2700.00 33.88 82.94 2800.00' 36.38 82.94 2900.00 38.88 82.94 3000.00 41.38. 82.94 3100.00 43.88 82.94 3200.00 46.38 82,94 3300.00 48.88 82.94 3400.00 S1.38 82.94 3500.00 53.88 82.94 3600.00 56.38 82.94 3700.00 58.88 82.94 3800.00 61.38 82'.94 3900.00 63.88 82'.94 3913.55 64.21 82.94 4698.85 64.21 82.94 4700.00 64.21 82.96 4800.00 64.20 84.07 4900'.00 64.19 85.18 5000.00 6~.19 86.29 S100.00 64.19 87.40 (Anadrill (c)97 NK25P11 3.0C 5:12 PM VERTICAL-DEPTaS SECTION . TVD SUB-SEA DEPART 1891.86 1831.86 99,99 1988.38 1928.38 126.00 2083.68 2023,68 156.17 2177.57 2117,57 190.46 2269.87 22'09.87 228.80 Page 2 COORDINATES-FROM ALASKA Zone 4 WELLHEAD X Y , 12.32 N 99.57 E 722004.44 5979931.54 15.53 N 125.46 E 722030.22 597993~.51 19.25 N 155.51 E 722060.15 5979940.11 '23.47 N 189.65 E 722094.15 S979945.35 28.20 N 227.83 E 722132.17 5979951.20 2360.40 2300.40 2,7,1.11 33.41 N 244'8.99 2388.99 317.32 39.1: N 2535.48 '2475,48 '367.33 45.27 N 2619.69 2559.69 421.06 51.89 N 2701.47 2641.47 478.40 58.96 N 2780.67 2720.67 539.24 2857.13 2797.13 603.46 2930.70 2870.70 670.95 3001.25 2941.25 741.57 3068.65 3008.6~ 815.19 3132.75 3072.75 891.67 3193.45 3133.45 970.86 3250.63 3190.63 1052.62 3304..17 3244.17 1136.78 3353.97 3293.97 1223.20 3399.95 3339.95 1311.69 3405.88 3345.88 1323.83 3747.50 3687.50 2028.56 3748.00 3688.00 2029.59 3791.52 3731.52 2119.39 3835.05 3775.05 2209.28 3878.60 3818.60 2299.25 3922.14 3862.14 2389.27 TOOL DL/ FACE 100 HS 2.S0 RS 2.50 HS 2.5O HS 2.50 HS 2.50 269,96 E 722174.13 5979957.66 HS 315.98 E 722219.95'5979964.71 HS 365.,78 E 722269.55 5979972.35 HS 419.28 E 722322.83 5979980.55. HS 476.38 E 722379.69 5979989.30 HS 2.50 2.50 2 .SO 2.50 2.50 66.46 N 536.96 E 72244'0.02 5979998.59 HS 2.50 74.37 N 600.92 E 722503.70 5980008.40 HS 2.50 82.69 N 668.12 E 722570.63 5980018.70 ~S 2.50 91.39 N 738.44 E 722640.66 59'80029.48 ~S 2.50 100.46 N 811.75 E 722713.66 5980040.72 ~S 2.S0 109.89 N 887.91 E 722789,51 5980052:40 HS 2.50 119.65 N 966.77 E ~22868.04 5980064.49 HS 2.50 129.73 N 1048.18 ~ 722949.11 5980076.97 HS 2.50 140.10 N 1131.99 E 723032.58 5980089,82 ~S 2.50 150.75 N 1218.04 E 723118.27 5980103.01 ~S 2.50 161.65 N 1306.16 E 723206.02 5980116.52 HS 2.50 163.15 N 1318.25 E 723218.06 5980118.37 ~S 2.50 250.00 N 2020.00 E 723916.90 5980225.96 91R 0.00 250.13 N '2021.'03 E 723917.93 5980226.11 91R 1.00 260.30 N 2110..48 E 724007.04 5980238.93 91R 1.00 268.73 N '2200.11 E 724096.37 5980250.01 90R 1.00 275.43 N 2289.88 E 724185.90 5980259.36 280.38 N 2379.77 E 724275.60 5980266.98 ..... .. 90R 1.00 89R 1. O0 " ' ! /~ :/~,, r~, --/-- . . . ~-'. r,,.'R- b,l"' ~ , , .':' !Ty n.,/_,, .... -,. FOR i .. I"~ ,...., ~ . ..... · ff'.:.' [-. i O 0 FROPOSED wELL PROFILE STATION MEASURED INCLN IDENTIFICATION 'DEPTH ANGLE DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA 5200.00 64.21 88.:51 , END 1/100 CURVE 5209.74 64.21 88.62 TB (SV4) 5278.93 64.21 '88.62 T5 (SV3) 6106.42 64.21 88.62 T3 (TT6/SV1) 7485.57 64.21 88.62 sEcTIoN DEPART 3965,66 '3905.66 2479.29 a96~.90 a909.90 2~88.06 4000,00' 3940.00 2'550.35 4360.00 4300.00 . 3295.32 4960.'0'0 4900.00 ! 4536.94' 1'3-3/8" CASING POINT "7715'.42 UG4A [K-15) 8634,86 WEST SAK 11760.93 CM3 (K-12) 13002.17 SHALE WALL'(TUFFs) 1488'7'.00 , . HRZ 6i6220.18 9-5/8" cAsING POINT ·17139.62 ALAPAH "C" 17139.62 TARGET *****~*~***** 17139,62 BASE ALAPAH mA" 18622.20 :64.21 .', 64,21 64.,,21 64:21 6'4.21 64...21 '64.2'1 64.21 64.21 64.21 88.62 88.62 ss.~2 88.62 . ss.62 BBj62 88.62 88.62 88.62' 88.62 5060:00 5000.'00 5460,00 .5400.00' 6820,00 6760~00 7~60:00 '7300.'00 8'180.00,8120.o0 4743.,87 .. 5571.62 8385.95 9503.4'0 11200..28 s?6o. O0 8700.00 12400.51 9'i60.00 '9100.0'0 1~228.25 · . 9160.00' 9100.00 13228.25 9160,00 9100.00' 13228.25 9805.00 9745,00 14562..99 7" LINER POINT 18966.99 TD "18966:99 . .. 64.21 64,21' 88:62 Ss.62 9955.00 9898.oo 9955.00 9895.'00 .. 14873,40 14873.40 : (Anadrill (C)97 NK25Pll '3.0C 5:12 PM P) coORDINATES-m°M WELLHEAD '283,60 N 2~69'.'74 E 283.82 N 2478,51 E 285.32 N 2540.78'E 303.27 N '3285.64 .E 333.20 N .4527'.08 E ALASKA Zone 4 TOOL , X Y FACE 724365,43,5980272.85 89R 724374.19 5980273.33 HS 724436.39 5980276.68 HS 725180.36 5980316.67 HS 726420.3'1 '5980383.3~ HS 338.18 N 4733.98 E 358~13 N 5561.61 E 425.96 .N 8375.53 E 452.89 N 9.492.82' E 493,.79 N 11189.44 R 726626.97 5980394.45 HS 729453.61 5980438.89 HS ~30264.17 5980590.00 HS 731380.1'3 5980650.00 HS , 7330~4,74 5980741.11 ~S · , 522'.71 N 12389.50 E 734273.36 598080'5.56 HS 54~.66 N 13217.12 E 735100~00 59'80850.00 HS .. 542,66 N 132!7,12 E 735100.00 5980850.00 RS 542,'66 N 13217.12 E 7351~0'00 5980850.00 HS 574,83 N 14551.66 E 736432.96 5980921.67 HS ., 582.31 N 14862,02 E 736742.94.5980938'.33 . ,582.31 N 1'48'62.O2 ~ 736742.94 5980938.33 DL/ 100 1.00 1.00 0.00 0,00 0'.00 ' O. O0 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0,00 SHARED SERV.ZCES, DRI'LL_TNG ' I - I' ii i J JlI i ! _ _ i i i ! i i ii i %' i ii i i ii ii i iiii J i ii <KB> 20 40 50( 60 70t 80 12000 .... , Ill /nadri ]l Sch]umberge~ ! NK-25 (Pll) VERTICAL SECTION VIEW Section at 87.65 ,,.., ~ '~ ,-" " -: i-uP-,. ITVD Scale.: 1 inch = 2000 feet , i i .... ' ",.. I i,_, .q . ~ Ioep scale".: J inch: 2000 feet ~o-- ~.- -..[ i Fl ".::.,i~4 '~"' (' · ._ i. .c-- .. , ~ . Dm- ! ...... ' ' .... J ..... ....... 10- ',, . ' ' - ' Marker Identification MD 8KB SECTN · ,' ,t . ~ ' ' ;. A). KB 0 0 0 0 i' . ' ' .. 'J B} KOPBUILD J/JO0 t000 ~000 0 0 )O .... I ' ! _ C) BUILD 1.5/JO0 1200 1200 3 2 ........ 7 ' ' .... ." ' " , ,O} BUILD 2/100 t400 t400 16 5 ooo: . '. . E). BUILD 2.5/100 1600 1EBB 40 9 , F) END 2.5/~00 BUILD ~715 t7t! 61 1~. ~ ! 't G) BUILD 2.5/~00 t820 1814 82 ii. )0 T8 ($v41 4 _4 ._I. H) END 2.5/~00 BUILD ' 39~4 3,406 t324 64. ! . , . II CUFIYF ~/~00 46§9 37~7 ~0~§ 6q. O- ~ ..... , '-'r-- K} t3-3/8' C~$IN~ ~0i~1 · ~I"~-'3~ ..... r L} 9-5/8" CASING POINf t71,40 9t60 13228 64. 0 - . , ~ NJ 7" LINER POINT ]8967 9955 ]4873 64. i I O) TD 18967 9955 ]4873 64. )_ Z4~r r~ ' mC .............. ._ i ...................... __ ~~ F-- %~' t '~-¢_~¢ -~ - - ~ ..... ] ......... ~ ........... ~ .... . ............ '~.~c ~m- ~ .......... ~ ........... i ...... - [ ......... ' ..... . .~ . ~ I ~ ~ ., ..... ~ ..... ~ .... ~z'~ ..... ~ ..........""7 .......~ ...... ~ . ' ... ~. ~ ....... ~- - ' .. . .', "'~7'z~'~ L "- [2':'_ ........................ ~~4 e~ l~m~ __ - -_ .... · . ~ I . . ..... , - ~-~ .......... ~ .............. , j ~ . O0 O0 O0 O0 O0 0 t000 2000 3000 4000 5000 6000 7000. 8000 9000 tO000 ilO00 12000 13000 14000 i5000 t6000 17000 SectiOn Depaptupe nadrtll {C)97 Nf125Pl! 3.0C 5:i5 PM P} i .21 .21 21 21 2i l "O i Anadr.i Schlumberger NK-25 (P PLAN VIEW i j ii i ii i _ i iiii ii ii CLOSURE ' ~4873 feet OECL SCALE DRA~N. at Azimuth 87.76 Narker ~) KB B} KO~ Cl D} F) END H) END I) CURVE J} END K) L) o) TO SHARED "'SERVICES. DRILLING i i i iii ii iii INATION ' +28.832 (E) .. : ' `1 inch = 2000 feet ~1. '13 Mar ~997 ' ' i ii i, i i , i m i i i ; I i : ' Ident~ficat]on 140 N/S E/H i ...... ..... ..................... i ....... 0 0 'N 0 E ~ BUILD 1/100 1000 0 N 0 E [LO J.S/']O0 .1200 0 N 3 E j J I ' I ELD 2/100 1400 2 N 16 E ,t ..... I I 2.5/,~ BUILD 39~4 ~63 N ~3~8 E t ........ ',, , -- :VE ~/~ 4699250 N 2020 E ' ~/~00 ~RVE 52~0 '.284 N 2479 E 3/8' CASING POIN17715 338 N 4734 E ' ) .,. ~ '. ............ . /i' CASING POINT ' 17~40 54B N ~3217 E ' '"i''" i ; /"~' ~ i LINERGET *xm~xxx,xx~xX~iNT ' ~7~40'.. 1Bg67 582543 NN132~71~B62 EE ' ' m ~ i, i. :..,. ~ . ,:~ ... ,,~. c .... ..~ .... .. . i ~!~,. ..................... ~ ,) z.L =. j ) ..~;- ~ ~ .. .. .. ' ...... L ......... ; ~ ' , : ~ ~ , , , ...... ' ............. , , K ~ ~ ' ,' ~000 ~ ', ~000 ~000 3000 ~000. 5000 6000 7000 BO00 9000 ~0000 ~000 ~000 ~3000 ~4000 ~5000 ~6000 ~7000 <- HEST ' EAST -> . , [Anadr~]! {c197 N(~:~il 3.0C 5: I§ PM P] WELL PERMIT CHECKLISToo. Y / -'~ 3,// GEOL AREA PROGRAM: expD dev/~redrlF] servr] wellbore seg~ ann disp para reqr] ADMINISTRATION 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well' located proper distance from drlg unit boundary.. 6. Well located proper distance from other wells ..... 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. . 13. Can permit be approved before 15-day wait ....... ENGINEERING REMARKS N N 14. Conductor string provided ............... ~_ N 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf cng .... 17. CMT vol adequate to tie-in long string to surf cng . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............ 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... .......... 23. If diverter required, is it adequate /.x3 N 24. Drilling fluid program schematic & equip list adequate .~_~ N 25. BOPEs adequate ............. ~ ...... ~ N 26. BOPE press rating adequate; test to 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N 28. Work will occur without operation shutdown ....... ~3 N 29. Is presence of H2S gas probable ............ ~ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones ..... Y 32. Seismic analysis of shallow gas zones .......... y N ,/I/~~/7. \ 33. Seabed condition survey (if off-shore) ....... ./~Y N ' ' 34. Contact name/phone for weekly progress reports . ./. . Y N [exploratory only] GEOLOGY: ENGINEERING: COMMIES ION: JDH~ mom ~X~-&C/' Comments/Instructions: Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * ****************************** ....... SCHLUMBERGER ....... * ............................ ****************************** .SEP 0 5 1(397 Ala~a 0~1 & Gas Cons. Commiss~', Anchorage COMPANY NAME : ARCO ALASKA, INC. WELL NAME : L6 - 25 FIELD NAME : LISBURNE BOROUGH '. NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22760-00 REFERENCE NO : 97398 * ALASKA COMPUTING CENTER . ****************************** * ....... SCHLUMBERGER ....... . ............................ ****************************** COMPANY NAlVlE : ARCO ALASKA, INC. WELL NAME : L6 - 25 FIELD NAME : LISBURNE BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22760-00 REFERENCE NO : 97398 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-SEP-1997 10:45 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/09/ 4 ORIGIN : FLIC REEL NAME : 97398 CONTINUATION # : PREVIOUS REEL : CO~ff4F, NT : ARCO ALASKA INC, LISBURNE, L6-25, API #50-029-22760-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/09/ 4 ORIGIN : FLIC TAPE NAME : 97398 CONTINUATION # : 1 PREVIOUS TAPE : CO~M~T : ARCO ALASKA INC, LISBURNE, L6-25, API #50-029-22760-00 TAPE HEADER LISBURNE CASED HOLE WIRELINE LOGS WELL NAME: L6 - 25 API NUMBER: 500292276000 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 4-SEP-97 JOB NUMBER: 97398 LOGGING ENGINEER: BAILEY OPERATOR WITNESS: MIKE BOLKOVA SURFACE LOCATION SECTION: 3 6 TOWNSHIP: 12N RANGE: 15E FNL: FSL: 1371 FEL : 656 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 60.10 DERRICK FLOOR: 60.10 GROUND LEVEL: 19.30 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9. 625 16871.0 47. O0 7.000 18110.0 29.00 4.500 16880.0 12.60 4.500 17328.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-SEP-1997 10:45 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: NONE LDWG CURVE CODE: NONE RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: .......... EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ No depth adjustments were made to this data as this is the PDC for this well. $ $ PAGE **** FILE HEADER **** FILE NAIVE : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 97/09/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... GRCH 17988.0 15538.0 $ CURVE SHIFT DATA - PASS TO PASS (I4F~ASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: NONE PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH This file contains PDC GR Pass #1. No pass to pass shifts were applied to this data. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-SEP-1997 10:45 PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN** NAi~E SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 1066276 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH GR GAPI 1066276 O0 000 O0 0 1 1 1 4 68 0000000000 TENS GR LB 1066276 O0 000 O0 0 1 1 1 4 68 0000000000 CCL GR V 1066276 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 18006.000 GRCH. GR -999.250 TENS.GR 1540.000 CCL.GR DEPT. 18000.000 GRCH. GR -999.250 TENS.GR 1580.000 CCL.GR DEPT. 17000.000 GRCH. GR 29.063 TENS. GR 1760.000 CCL.GR -0.088 O. 034 -0.053 DEPT. 16000.000 GRCH. GR 99.250 TENS.GR 1755.000 CCL.GR 0.050 LIS Tape ~erification Listing Schlumberger Alaska Computing Center 4-SEP-1997 10:45 PAGE: DEPT. 15538.000 GRCH. GR 101.750 TENS.GR 1740.000 CCL.GR -0. 073 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUM~iARY VENDOR TOOL CODE START DEPTH STOP DEPTH ..................... 18006.0 15538.0 GRCH $ LOG HEADER DATA DATE LOGGED: 12-JUL-97 SOFTWARE VERSION: 44.2 TIME LOGGER ON BOTTOM: 2156 12-JUL-97 TD DRILLER (FT) : 18015.0 TD LOGGER (FT) : 18013.0 TOP LOG INTERVAL (FT): 15538.0 BOTTOM LOG INTERVAL (FT) : 18006.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VEaX~OR TOOL CODE TOOL TYPE TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-SEP-1997 10:45 PAGE: GR GAMMA RAY $ PGGA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 16871.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TE~PERATtrRE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 50.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: TIED IN TO SWS ADN DATED 1-JUN-97. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-SEP-1997 10:45 PAGE: 6 TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1066276 O0 000 O0 0 2 1 1 4 68 0000000000 GR PS1 GAPI 1066276 O0 000 O0 0 2 1 1 4 68 0000000000 TENS PS1 LB 1066276 O0 000 O0 0 2 1 1 4 68 0000000000 CCL PS1 V 1066276 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 18019.500 GR.PS1 DEPT. 18000.000 GR.PS1 DEPT. 17000.000 GR.PS1 DEPT. 16000.000 GR.PS1 DEPT. 15536.500 GR.PS1 68.063 TENS.PSi 770.000 CCL.PS1 87.438 TENS.PSi 1580.000 CCL.PS1 29.063 TENS.PSi 1760.000 CCL.PS1 99.250 TENS.PSi 1755.000 CCL.PSl 97.938 TENS.PSi 1655.000 CCL.PS1 0.070 O. 034 - O. 053 O. 050 O. 025 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-SEP-1997 10:45 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE . FLIC VERSION · 001C01 DATE · 97/09/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE - 97/09/ 4 ORIGIN : FLIC TAPE NAME : 97398 CONTINUATION # : 1 PREVIOUS TAPE : COF~VT : ARCO ALASKA INC, LISBURNE, L6-25, API #50-029-22760-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/09/ 4 ORIGIN : FLIC REEL NAME : 97398 CONTINUATION # : PREVIOUS REEL : COF~TVT : ARCO ALASKA INC, LISBURNE, L6-25, API #50-029-22760-00 * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... RECE VEE) SEP 0 5 1997 A~aska Oil & Gas Cons. Commiss.~on Anchorage COMPANY NAME : ARCO ALASKA INC. WELL NAME : NK-25 FIELD NAlViE : NIAKUK BOROUGH : NORTH SLOPE STATE · ALASKA API NUMBER : 50-029-22760-00 REFERENCE NO : 97267 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/08/25 ORIGIN '. FLIC REEL NAYiE · 97267 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC, NK-25, NIAKUK, API #50-029-22760-00 **** TAPE HEADER **** SERVICE NAi~E : EDIT DATE · 97/08/25 ORIGIN : FLIC TAPE NAME : 97267 CONTINUATION # : 1 PREVIOUS TAPE : COI~4ENT : ARCO ALASKA INC, NK-25, NIAKUK, API #50-029-22760-00 TAPE HEADER NIAKUK OPEN HOLE WIRELINE LOGS WELL NAME: API ~ER : OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER .. LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL : FSL : FEL : FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING RUN 1 97267 H KIRKBY TIM NELSON NK-25 500292276000 ARCO ALASKA INC. SCHLUMBERGER WELL SERVICES 21-JUL-97 RUN2 97267 D PALMER LES P~ 1371 656 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) ................................ 8.500 7.000 16979.0 RUN 3 36 12N 1SE 60.10 58.60 19.30 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 3RD STRING PRODUCTION STRING CONTAINED HEREIN IS THE LDWG FORMATTED OPENHOLE AND CASED DATA ACQUIRED ON ARCO ALASKA'S NI KUK NK-25 WELL. NATURAL GAMMA SPECTROMETRY, BOREHOLE COMPENSATED SONIC AND FORMATION MICRO SCANNER DATA WAS ACQUIRED IN OPENHOLE FOR RUN #1. NATURAL G;2V~4A SPECTROMETRY DATA WAS ACQUIRED IN CASING ON RUN #2. THIS IS A REISSUE OF THIS DATA TO INCLUDE BOREHOLE COMPENSATED SONIC DT ACQUIRED UP INTO CASING. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE · 97/08/25 MAX REC SIZE : 1024 FILE TYPE '. LO LAST FILE : FILE HEADER FILE ~ER : 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SD?4MARY LDWG TOOL CODE START DEPTH BCS 18100.0 SGR 17302.0 FMS 17318.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 88888 0 18061 0 18054 5 18040 5 18019 5 18009 5 17992 5 17981 5 17973 0 17964 5 17954 5 STOP DEPTH 16979.0 16979.0 16979.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... BCS SGR FMS 88887.0 88885.5 88885.5 18060.0 18053.0 18039.0 18018.0 18O08.0 17990.5 17979.5 17970.5 17962.5 17953.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 17943 0 17938 5 17927 5 17919 5 17909 5 17898 0 17875 5 17858.0 17831.0 17781.5 17773.5 17747.0 17736.0 17721.0 17710.5 17705.5 17697.5 17687.5 17674.0 17661.5 17657.5 17649.5 17643.5 17627.0 17608.0 17595.0 17572.5 17565.5 17543 0 17538 0 17504 0 17489 0 17485 0 17478 5 17457.0 17431.5 17426.5 17409.5 17399.5 17396.5 17390.0 17376.0 17355.5 17345.0 17333.5 17326.5 17320.0 17318.0 17311.0 17303.0 17292.0 17283.0 17263.0 17260.0 17257.0 17941.5 17936.5 17926.5 17918.5 17908.0 17896.0 17875.0 17857.0 17829.5 17781.5 17775.5 17747.5 17736.0 17720.5 17710.0 17705.5 17697.5 17689.0 17676.0 17663.0 17659.0 17649.0 17643.0 17624.5 17607.5 17591.5 17571.0 17562.5 17538.5 17532.5 17502.5 17488.0 17484.0 17477.5 17456.0 17430.5 17424.5 17405.0 17396.5 17394.0 17386.0 17372.5 17351.5 17343.5 17329.5 17324.0 17318.0 17315.5 17309.0 17301.0 17289.5 17281.0 17257.5 17260.5 17254.5 17260.5 17254.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 4 17248.5 17245.0 17243.0 17240.5 17235.0 17234.5 17214.5 17214.0 17209.0 17208.5 17198.5 17196.0 17177.0 17175.5 17175.0 17170.0 17169.5 17157.0 17153.0 17135.5 17128.0 17124.0 17114.0 17113.0 17094.0 17093.5 17082 5 17070 0 17054 5 17048 0 17042 5 17034 0 17024 5 17014 5 16986.0 16976.0 16959.0 16938.0 16922.5 16894.5 16872.0 16834.0 16812.5 16792.0 16765.0 16748.5 16731.5 100.0 $ MERGED DATA SOURCE 17240.0 17230.0 17212.5 17206.5 17197.0 17173.5 17167.5 17155.0 17245.5 17245.5 17240.0 17240.0 17236.0 17236.0 17230.0 17230.0 17212.5 17212.5 17206.5 17206.5 17194.0 17194.0 17175.0 17175.0 17173.0 17173.0 17167.0 17167.0 17150.5 17150.5 17133.0 17133.0 17133.0 17126.0 17126.0 17123.5 17123.5 17111.5 17111.5 17111.5 17093.0 17093.0 17091.5 17080.5 17081.0 17081.0 17067.5 17067.5 17053.0 17046.5 17046.5 17042.0 17033.0 17033.0 17023.5 17023.5 17013.5 17013.5 16986.0 16986.0 16975.5 16974.0 16974.0 16957.5 16933.5 16912.5 16886.0 16864.5 16824.0 16802.5 16782.5 16753.5 16738.0 16722.5 91 . 0 98.0 98.0 LDWG TOOL CODE RUN NO. PASS NO. MERGE TOP MERGE BASE $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: RE~JLUJfS: THIS FILE CONTAINS THE RUN #1 OPENHOLE BOREHOLE COMPENSATED SONIC, NATURAL GAMMA SPECTROMETRY, AND FORMATION MICROSCANNER DATA. ALL CURVES HAVE BEEN DEPTH SHIFTED TO SWS ANADRILLS RAB-ADN GAMMA RAY. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645393 O0 000 O0 0 1 1 1 4 68 0000000000 DT BCS US/F 645393 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 645393 O0 000 O0 0 1 1 1 4 68 0000000000 TENS BCS LB 645393 O0 000 O0 0 1 1 1 4 68 0000000000 TEND BCS LB 645393 O0 000 O0 0 1 1 1 4 68 0000000000 Nfl{ESBCS 0H~645393 O0 000 O0 0 1 1 1 4 68 0000000000 MTEMBCS DEGF 645393 O0 000 O0 0 1 1 1 4 68 0000000000 CGR SGR GAPI 645393 O0 000 O0 0 1 1 1 4 68 0000000000 POTA SGR PCT 645393 O0 000 O0 0 1 1 1 4 68 0000000000 THOR SGR PPM 645393 O0 000 O0 0 1 1 1 4 68 0000000000 URANSGR PPM 645393 O0 000 O0 0 1 1 1 4 68 0000000000 DEV FME DEC 645393 O0 000 O0 0 1 1 1 4 68 0000000000 RB1 FMS DEG 645393 O0 000 O0 0 1 1 1 4 68 0000000000 AZ FMS DEG 645393 O0 000 O0 0 1 1 1 4 68 0000000000 C13 FMS IN 645393 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: NAiVlE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDF_d~ # LOG TYPE CI_~SS MOD NUMB SglvlP EL~4 CODE (HEX) C24 FMS IN 645393 O0 000 O0 0 1 1 1 4 68 0000000000 * * DA TA * * DEPT. 18100.000 DT. BCS -999.250 GR.BCS -999.250 TENS.BCS TEND.BCS 1472.934 ~4~ES.BCS 16.303 MTEM. BCS 186.310 CGR.SGR POTA.SGR -999.250 THOR.SGR -999.250 URAN. SGR -999.250 DEV. FMS RB1.FMS -999.250 AZ.FMS -999.250 Cl3.FMS -999.250 C24.FMS DEPT. 16979.000 DT.BCS 74.835 GR.BCS 23.927 TENS. BCS TEND.BCS 1138.839 lVi~ES.BCS 2.183 MTEM. BCS 156.943 CGR. SGR POTA. SGR 0.811 THOR.SGR 4.578 URAN. SGR 1.957 DEV. FMS RB1.FMS -999.250 AZ.F MS -999.250 Cl3.FMS 9.121 C24.FMS 1122.000 -999.250 -999.250 -999.250 1078.000 31.656 -999.250 10.395 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE S~Y LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: LDWG TOOL CODE START DEPTH SGR 17968.0 BCS 16979.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (M~ASUREDDEPTH) BASELINE DEPTH 88888.0 17938.5 17932.0 17924.5 17919.0 17900.0 17878.0 17867.0 17857.5 17855.0 17825.5 17783.5 17776.5 17753.5 17738.0 17727.5 17722.5 17712.0 17690.0 17673.5 17662 5 17655 0 17649 0 17643 0 17625 5 17609 5 17608 0 17596.5 17575.5 17566.5 17543.5 17504.5 17485.5 17478.5 17457.0 17431.5 17409.5 17397.5 17389.5 17370.5 17355.5 17345.0 17342.5 17333.0 STOP DEPTH 16721.0 16705.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... SGR BCS 88882.5 88887.0 17933.0 17926.5 17920.0 17914.5 17896.5 17874 5 17864 0 17854 5 17851 5 17823 0 17781 5 17775.5 17751.5 17736.5 17726.0 17721.0 17710.0 17691.0 17674.0 17663.0 17654.5 17648.0 17640.0 17623.0 17607.5 17606.0 17592.0 17573.0 17562.5 17538.0 17502.0 17484.0 17476.5 17455.5 17430.5 17405.5 17394 0 17384 5 17364 5 17350 5 17343 0 17338 5 17329 5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 17304 5 17282 5 17244 5 17235 5 17214 5 17198 0 17175.0 17169.5 17135.5 17130.5 17114.5 17096.5 17045.5 16991.0 16976.0 16959.0 16938.0 16937.5 16933.0 16922.5 16921.0 16894.5 16894.0 16872.0 16871.0 16855.0 16834.0 16822.5 16812.5 16811.0 16792.0 16783.5 16765.0 16760.5 16752.0 16748.5 16743.0 16731.5 16731.0 100.0 $ 17303.0 17281.0 17240.0 17229.5 17212.5 17197.0 17173.0 17167.0 17133.5 17129.0 17112.0 17094.5 17043.5 16989.0 16957.0 16934.0 16927.0 16911.5 16886.0 16864.0 16845.0 16813.0 16802.5 16773.5 16751.5 16743.0 16733.0 16723.0 92.0 16975.5 16957.5 16933.5 16912.5 16886.0 16864.5 16824.0 16802.5 16782.5 16753.5 16738.0 16722.5 91.0 RE~iAP~KS: THIS FILE CONTAINS RUN #1 BCS MAIN LOG RUN INTO CASING AND RUN #2 MAIN LOG NATURAL GA~9~A SPECTROMETRY RUN INTO CASING. THIS DATA HAS BEEN DEPTH CORRECTED TO SWS ANADRILL RAB-ADN GAlV~iA RAY. LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 9 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NOW~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645393 O0 000 O0 0 2 1 1 4 68 0000000000 DT BCS US/F 645393 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH BCS GAPI 645393 O0 000 O0 0 2 1 1 4 68 0000000000 GR SGR GAPI 645393 O0 000 O0 0 2 1 1 4 68 0000000000 CGR SGR GAPI 645393 O0 000 O0 0 2 1 1 4 68 0000000000 POTA SGR PCT 645393 O0 000 O0 0 2 1 1 4 68 0000000000 THOR SGR PPM 645393 O0 000 O0 0 2 1 1 4 68 0000000000 URANSGR PPM 645393 O0 000 O0 0 2 1' 1 4 68 0000000000 TENS SGR LB 645393 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 17968.000 DT. BCS -999.250 GRCH.BCS -999.250 GR.SGR -999.250 CGR.SGR -999.250 POTA.SGR -999.250 THOR.SGR -999.250 URAN. SGR -999.250 TENS.SGR 4809.000 DEPT. 16705.000 DT.BCS 55.900 GRCH.BCS 64.635 GR.SGR -999.250 CGR.SGR -999.250 POTA.SGR -999.250 THOR.SGR -999.250 O-RAN. SGR -999.250 TENS.SGR -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 10 **** FILE TRAILER **** FILE NA~E : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE · 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREFiENT : FILE SUM~zARY FILE H~ER FILE NUMBER 3 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH BHC 18083.0 16979.0 NGT 17301.0 16979.0 FMS 17308.0 16979.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIMiE CIRCULATION ENDED '. TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 9-JUN-97 8C0-609 400 1 -JUN-97 2200 1 -JUN-97 18114.0 18105.0 16720.0 18100.0 TOOLNUM~ER ........... LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 11 NGT FMS SDT $ GAF~LA RAY FORMATION MICROSCANNER SONIC CARTRIDGE NGC-C 1935 MEAC-A 745 SDC-CB 17 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 16979.0 16979.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S) : 48.0 MUD PH : 9.6 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF): MUD AT IWIEASURED TEMPERATURE (MT): 2.070 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 1.820 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1. 750 MUD CAKE AT (BHT): 68.0 68.0 68.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: RFT & SONIC RUN IN COMBINATION SECOND RUN DRILL PIPE CONVEYED. RFT PRESSURES OBTAINED ON DOWN PASS TO TD. TIED TO SWS ANADRILLS RAB-ADN LOG DATED 5-31-97. FOUR STANDOFF USED ON THE SONIC FOR CENTRALIZATION. THIS WAS THE FIRST RUN LOGGED ON WIRELINE. COULD NOT GET DOWN TO TOTAL DEPTH AFTER SUCCESSIVE ATTEMPTS. LOGGED OUT FROM DEEPEST POINT REACHED. THIS FILE CONTAINS THE RAW OPENHOLE BHC SONIC, FMS AND NGT DATA FROM RUN #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 12 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 116 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 8 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645393 O0 000 O0 0 3 1 1 4 68 0000000000 GR BHC GAPI 645393 O0 000 O0 0 3 1 1 4 68 0000000000 DT BHC US/F 645393 O0 000 O0 0 3 1 1 4 68 0000000000 TTi BHC US 645393 O0 000 O0 0 3 1 1 4 68 0000000000 TT2 BHC US 645393 O0 000 O0 0 3 1 1 4 68 0000000000 TT3 BHC US 645393 O0 000 O0 0 3 1 1 4 68 0000000000 TT4 BHC US 645393 O0 000 O0 0 3 1 1 4 68 0000000000 TENS BHC LB 645393 O0 000 O0 0 3 1 1 4 68 0000000000 HTENBHC LB 645393 O0 000 O0 0 3 1 1 4 68 0000000000 I~ES BHC 0I~4M645393 O0 000 O0 0 3 1 1 4 68 0000000000 MTEMBHC DEGF 645393 O0 000 O0 0 3 1 1 4 68 0000000000 SGR NGT GAPI 645393 O0 000 O0 0 3 1 1 4 68 0000000000 CGR NGT GAPI 645393 O0 000 O0 0 3 1 1 4 68 0000000000 POTA NGT PU 645393 O0 000 O0 0 3 1 1 4 68 0000000000 THOR NGT PPM 645393 O0 000 O0 0 3 1 1 4 68 0000000000 URANNGT PPM 645393 O0 000 O0 0 3 1 1 4 68 0000000000 WING NGT CPS 645393 O0 000 O0 0 3 1 1 4 68 0000000000 W2NG NGT CPS 645393 O0 000 O0 0 3 1 1 4 68 0000000000 W3NG NGT CPS 645393 O0 000 O0 0 3 1 1 4 68 0000000000 W4NG NGT CPS 645393 O0 000 O0 0 3 1 1 4 68 0000000000 WSNG NGT CPS 645393 O0 000 O0 0 3 1 1 4 68 0000000000 TPRANGT 645393 O0 000 O0 0 3 1 1 4 68 0000000000 TURANGT 645393 O0 000 O0 0 3 1 1 4 68 0000000000 DEVI FMS DEG 645393 O0 000 O0 0 3 1 1 4 68 0000000000 P1AZ FMS DEG 645393 O0 000 O0 0 3 1 1 4 68 0000000000 RB FMS DEG 645393 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 13 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD~ SAMP ELEM CODE (HEX) HLAZ FMS DEG 645393 O0 000 O0 0 3 1 1 4 68 0000000000 Cl FMS IN 645393 O0 000 O0 0 3 1 1 4 68 0000000000 C2 FMS IN 645393 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 18111.500 GR.BHC 5. 794 DT. BHC 49.500 TT1.BHC TT2.BHC 280.400 TT3.BHC 377.200 TT4.BHC 278.800 TENS.BHC HTEN. BHC -11.060 I~RES.BHC 16.303 MTEM. BHC 186.310 SGR.NGT CGR.NGT -999.250 POTA.NGT -999.250 THOR.NGT -999.250 URAN. NGT W1NG.NGT -999.250 W2NG.NGT -999.250 W3NG.NGT -999.250 W4NG.NGT WSNG.NGT ~999.250 TPRA.NGT -999.250 TURA.NGT -999.250 DEVI.FMS P1AZ.FMS ~999.250 RB.FMS -999.250 HLAZ.FMS -999.250 Cl.FMS C2. FMS -999. 250 DEPT. 16979. 000 GR. BHC 27. 328 DT. BHC 69.100 TT1 . BHC TT2.BHC 360.400 TT3.BHC 521.200 TT4.BHC 362.800 TENS.BHC HTEN. BHC 1166.869 BIRES.BHC 1.994 MTEM. BHC 157.051 SGR.NGT CGR. NGT 34. 342 POTA.NGT O. 817 THOR. NGT 5. 221 URAN. NGT W1NG.NGT 148.244 W2NG.NGT 67. 032 W3NG.NGT 21.270 W4NG.NGT WSNG.NGT 8.379 TPRA.NGT 6.391 TURA.NGT 3. 019 DEVI.FMS P1AZ.FMS 37.437 RB.FMS 6.391 H~.FMS 105.847 Cl.FMS C2. FMS 8. 994 380.000 1524.000 -999.250 -999.250 -999.250 -999.250 -999.250 517.600 1159.000 47.743 1.729 5.801 40.062 8.662 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~iE : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 14 FILE HEADER FILE NUMBER 4 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NLTM~ER : 1 TOOL STRING AFgM~ER: 1 PASS NUFiBER : 2 DEPTH INCRE~iF2FP: 0.5000 FILE SUM~ZARY VEATDOR TOOL CODE START DEPTH ........................... BHC 18081.0 NGT 17301.0 FMS 17321.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 17871.0 16979.0 16979.0 9-JUN-97 8C0 - 609 400 1 -JUN-97 2200 1 -JUN-97 18114.0 18105.0 16720.0 18100.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUM23ER NGT GAF~IA RAY NGC-C 1935 FMS FORMATION MICRO SCANNER MEAC-A 745 SDT SONIC CARTRIDGE SDC-CB 17 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 8.500 16979.0 16979.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S) : 48.0 MUD PH: 9.6 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2.070 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 1. 820 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1. 750 MUD CAKE AT (BHT) : 68.0 68.0 68.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 15 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: RFT & SONIC RUN IN COMBINATION SECOND RUN DRILL PIPE CONVEYED. RFT PRESSURES OBTAINED ON DOWN PASS TO TD. TIED TO SWS ANADRILLS RAB-ADN LOG DATED 5-31-97. FOUR STANDOFF USED ON THE SONIC FOR CENTRALIZATION. THIS WAS THE FIRST RUN LOGGED ON WIRELINE. COULD NOT GET DOWN TO TOTAL DEPTH AFTER SUCCESSIVE ATTEMPTS. LOGGED OUT FROM DEEPEST POINT REACHED. THIS FILE CONTAINS THE RAW REPEAT ACQUIRED IN OPENHOLE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 116 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 8 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 16 ** SET TYPE - CHAN ** NA~iE SERV UNIT SERVICE API API API API FILE NUMB NUFiB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 4 1 1 4 68 0000000000 DEPT FT 645393 GR BHC GAPI 645393 O0 000 O0 0 4 1 1 4 68 0000000000 DT BHC US/F 645393 O0 000 O0 0 4 1 1 4 68 0000000000 TT1 BHC US 645393 O0 000 O0 0 4 1 1 4 68 0000000000 TT2 BHC US 645393 O0 000 O0 0 4 1 1 4 68 0000000000 TT3 BHC US 645393 O0 000 O0 0 4 1 1 4 68 0000000000 TT4 BHC US 645393 O0 000 O0 0 4 1 1 4 68 0000000000 TENS BHC LB 645393 O0 000 O0 0 4 1 1 4 68 0000000000 HTENBHC LB 645393 O0 000 O0 0 4 1 1 4 68 0000000000 f4RES BHC OPIUM645393 O0 000 O0 0 4 1 1 4 68 0000000000 MTEMBHC DEGF 645393 O0 000 O0 0 4 1 1 4 68 0000000000 SGR NGT GAPI 645393 O0 000 O0 0 4 1 1 4 68 0000000000 CGR NGT GAPI 645393 O0 000 O0 0 4 1 1 4 68 0000000000 POTA NGT PU 645393 O0 000 O0 0 4 1 1 4 68 0000000000 THOR NGT PPM 645393 O0 000 O0 0 4 1 1 4 68 0000000000 URANNGT PPM 645393 O0 000 O0 0 4 1 1 4 68 0000000000 W1NG NGT CPS 645393 O0 000 O0 0 4 1 1 4 68 0000000000 W2NG NGT CPS 645393 O0 000 O0 0 4 1 1 4 68 0000000000 W3NG NGT CPS 645393 O0 000 O0 0 4 1 1 4 68 0000000000 W4NG NGT CPS 645393 O0 000 O0 0 4 1 1 4 68 0000000000 WSNG NGT CPS 645393 O0 000 O0 0 4 1 1 4 68 0000000000 TPRA NGT 645393 O0 000 O0 0 4 1 1 4 68 0000000000 TURANGT 645393 O0 000 O0 0 4 1 1 4 68 0000000000 DEVI NGT DEG 645393 O0 000 O0 0 4 1 1 4 68 0000000000 P1AZ FMS DEG 645393 O0 000 O0 0 4 1 1 4 68 0000000000 RB FMS DEG 645393 O0 000 O0 0 4 1 1 4 68 0000000000 HLAZ FMS DEG 645393 O0 000 O0 0 4 1 1 4 68 0000000000 Cl FMS IN 645393 O0 000 O0 0 4 1 1 4 68 0000000000 C2 FMS IN 645393 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 18111.000 TT2.BHC 276.400 HTEN. BHC -0.858 CGR.NGT -999.250 W1NC.NGT -999.250 WSNG.NGT -999.250 P1AZ.FMS -999.250 C2.FMS -999.250 CR.BHC 23.005 DT.BHC 49.700 TT1.BHC TT3.BHC 368.000 TT4.BHC 269.200 TENS.BHC MRES.BHC 23.175 MTEM. BHC 185.778 SGR.NGT POTA.NGT -999.250 THOR.NGT -999.250 URAN. NGT W2NG.NGT -999.250 W3NG.NGT -999.250 W4NG.NGT TPRA.NGT -999.250 TURA.NGT -999.250 DEVI.NGT RB.FMS -999.250 HLAZ.FMS -999.250 Cl.FMS 376.400 1252.000 -999.250 -999.250 ~999.250 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 17 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .005 SERVICE · FLIC VERSION : O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 5 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGT 17952.0 BHC 16979.0 $ LOG HEADER DATA STOP DEPTH 16722.0 16705.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGT GA~VA RAY BHC BOREHOLE COMP. SONIC $ BOREHOLE AND CASING DATA 9-JUN-97 8C0 - 609 400 1 -JUN-97 2200 1 -JUN-97 18114.0 18105.0 16720.0 18100.0 TOOL NUMBER NGC-C 1935 SDC-CB 17 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 18 OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 16979.0 16979.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S) '. 48.0 MUD PH : 9.6 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHIO4) AT TEMPERATURE (DEGF) : MUD AT MEAS~ TEMPERATURE (MT): 2.070 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT) .. 1. 820 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1. 750 MUD CAKE AT (BHT) : 68.0 68.0 68.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: RFT & SONIC RUN IN COMBINATION SECOND RUN DRILL PIPE CONVEYED. RFT PRESSURES OBTAINED ON DOWN PASS TO TD. TIED TO SWS ANADRILLS RAB-ADN LOG DATED 5-31-97. FOUR STANDOFF USED ON THE SONIC FOR CENTRALIZATION. THIS WAS THE FIRST RUN LOGGED ON WIRELINE. COULD NOT GET DOWN TO TOTAL DEPTH AFTER SUCCESSIVE ATTEMPTS. LOGGED OUT FROM DEEPEST POINT REACHED. THIS FILE CONTAINS RUN #2 RAW CASED HOLE NGT MAIN LOG DATA AND RUN #1 RAW MAIN LOG BHC DATA ACQUIRED UP INTO CASING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 LI~ Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 19 TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 5 1 1 4 68 0000000000 DEPT FT 645393 DT BHC US/F 645393 O0 000 O0 0 5 1 1 4 68 0000000000 GR BHC GAPI 645393 O0 000 O0 0 5 1 1 4 68 0000000000 TT1 BHC US 645393 O0 000 O0 0 5 1 1 4 68 0000000000 TT2 BHC US 645393 O0 000 O0 0 5 1 1 4 68 0000000000 TT3 BHC US 645393 O0 000 O0 0 5 1 1 4 68 0000000000 TT4 BHC US 645393 O0 000 O0 0 5 1 1 4 68 0000000000 SGR NGT GAPI 645393 O0 000 O0 0 5 1 1 4 68 0000000000 CGR NGT GAPI 645393 O0 000 O0 0 5 1 1 4 68 0000000000 POTA NGT PU 645393 O0 000 O0 0 5 1 1 4 68 0000000000 THOR NGT PPM 645393 O0 000 O0 0 5 1 1 4 68 0000000000 UNANNGT PPM 645393 O0 000 O0 0 5 1 1 4 68 0000000000 WiNG NGT CPS 645393 O0 000 O0 0 5 1 1 4 68 0000000000 W2NG NGT CPS 645393 O0 000 O0 0 5 1 1 4 68 0000000000 W3NG NGT CPS 645393 O0 000 O0 0 5 1 1 4 68 0000000000 W4NG NGT CPS 645393 O0 000 O0 0 5 1 1 4 68 0000000000 WSNG NGT CPS 645393 O0 000 O0 0 5 1 1 4 68 0000000000 TPRANGT 645393 O0 000 O0 0 5 1 1 4 68 0000000000 TURANGT 645393 O0 000 O0 0 5 1 1 4 68 0000000000 TENS NGT LB 645393 O0 000 O0 0 5 1 1 4 68 0000000000 * * DA TA * * DEPT. 17987.000 TT2.BHC -999.250 CGR.NGT -21.997 W1NG.NGT 136.364 WSNG.NGT 0.000 DT. BHC -999.250 GR.BHC -999.250 TT1.BHC TT3.BHC -999.250 TT4.BHC -999.250 SGR.NGT POTA.NGT -0.834 THOR.NGT -2.145 URAN.NGT W2NG.NGT 45.455 W3NG.NGT 0.000 W4NG.NGT TPRA.NGT -21.451 TURA.NGT -0.294 TENS.NGT -999.250 33.902 7.305 0.000 3556.000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 2O DEPT. 16705.000 DT. BHC 55.900 GR.BHC TT2.BHC -999.250 TT3.BHC -999.250 TT4.BHC CGR.NGT -999.250 POTA.NGT -999.250 THOR.NGT W1NG.NGT -999.250 W2NG.NGT -999.250 W3NG.NGT WSNG.NGT -999.250 TPRA.NGT -999.250 TURA.NGT 64.635 TT1.BHC -999.250 SGR.NGT -999.250 URAN. NGT -999.250 W4NG.NGT -999.250 TENS.NGT -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA **** FILE TRAILER **** FILE NAIVE : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NU~IBER 6 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NU~iBER : 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NGT 17458.0 16730.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIM~ CIRCULATION ENDED '. TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) 9-JUN-97 8C0-609 400 1-JUN-97 2200 1 -JUN-97 18114.0 18105.0 16720.0 18100.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 21 LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGT GAMMA RAY $ TOOL NUMBER NGC-C 1935 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 16979.0 16979.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S) : 48.0 MUD PH: 9.6 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (Oh?~l) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): 2.070 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): 1. 820 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1. 750 MUD CAKE AT (BHT): 68.0 68.0 68.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) '. TOOL STANDOFF (IN): REMARKS: RFT & SONIC RUN IN COMBINATION SECOND RUN DRILL PIPE CONVEYED. RFT PRESSURES OBTAINED ON DOWN PASS TO TD. TIED TO SWS ANADRILLS RAB-ADN LOG DATED 5-31-97. FOUR STANDOFF USED ON THE SONIC FOR CENTRALIZATION. THIS WAS THE FIRST RUN LOGGED ON WIRELINE. COULD NOT GET DOWN TO TOTAL DEPTH AFTER SUCCESSIVE ATTEMPTS. LOGGED OUT FROM DEEPEST POINT REACHED. THIS FILE CONTAINS RUN #2 RAW CASED HOLE NGT REPEAT DATA. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 22 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD AU3?4B SAMP ELEM CODE (HEX) DEPT FT 645393 O0 000 O0 0 6 1 1 4 68 0000000000 SGR NGT GAPI 645393 O0 000 O0 0 6 1 1 4 68 0000000000 CGR NGT GAPI 645393 O0 000 O0 0 6 1 1 4 68 0000000000 POTA NGT PU 645393 O0 000 O0 0 6 1 1 4 68 0000000000 THOR NGT PPM 645393 O0 000 O0 0 6 1 1 4 68 0000000000 URANNGT PPM 645393 O0 000 O0 0 6 1 1 4 68 0000000000 WING NGT CPS 645393 O0 000 O0 0 6 1 1 4 68 0000000000 W2NG NGT CPS 645393 O0 000 O0 0 6 1 1 4 68 0000000000 W3NG NGT CPS 645393 O0 000 O0 0 6 1 1 4 68 0000000000 W4NG NGT CPS 645393 O0 000 O0 0 6 1 1 4 68 0000000000 WSNG NGT CPS 645393 O0 000 O0 0 6 i 1 4 68 0000000000 TPRANGT 645393 O0 000 O0 0 6 1 1 4 68 0000000000 TURANGT 645393 O0 000 O0 0 6 1 1 4 68 0000000000 TENS NGT LB 645393 O0 000 O0 0 6 1 1 4 68 0000000000 DATA ** DEPT. 17491.500 SGR.NGT 8.606 CGR.NGT -1.769 POTA.NGT THOR.NGT -0.108 URAN. NGT 1.356 W1NG.NGT 30.769 W2NG.NGT W3NG.NGT 0.000 W4NG.NGT 0.000 WSNG.NGT 0.000 TPRA.NGT TURA.NGT -0.079 TENS.NGT 4251.000 -0.083 15.385 -1.076 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-AUG-1997 14:46 PAGE: 23 DEPT. 16720.000 SGR.NGT THOR.NGT 12.534 URAN. NGT W3NG.NGT 56.604 W4NG.NGT TURA.NGT 3.695 TENS.NGT 103.096 CGR.NGT 3.392 W1NG.NGT 11.680 W5NG.NGT 4741.000 77.138 POTA.NGT 351.303 W2NG.NGT 2.695 TPRA.NGT 1.700 151.842 7.372 ** END OF DATA ** **** FILE TRAILER **** FILE NAMiE : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/08/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/08/25 ORIGIN : FLIC TAPE NAFiE : 97267 CONTINUATION # .. 1 PREVIOUS TAPE : COFk4ENT : ARCO ALASKA INC, NK-25, NIAKUK, API #50-029-22760-00 **** REEL TRAILER **** SERVICE NA~iE : EDIT DATE : 97/08/25 ORIGIN : FLIC REEL NAME : 97267 CONTINUATION # '. PREVIOUS REEL : COI~IENT : ARCO ALASKA INC, NK-25, NIAKUK, API #50-029-22760-00 * ALASKA COMPUTING CENTER * ._ * ....... SCHLUMBERGER ********** ............ RECEIVED ,~UL 3 't ~9~J~ ,N'a~Oit& Gas Oons, ~m~ ~ra~ COMPANY NAME : ARCO ALASKA, INC. WELL NAME : NK-25 FIELD NAME : iViAKu~r~ BOROUGH : NORTH SLOPE STATE : ALASKA API 1VUMBER : 50-029-22760_00 REFEREIVCE NO : 97245 * AI~ASKA COMPUTING CENTER * ....... SCHLUMBERGER COMPANY NA~E : ARCO ALASKA, INC. WELL NAME : NK-25 FIELD NAME : NIAKUK BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22760-00 REFERENCE NO : 97245 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/07/ 7 ORIGIN : FLIC REEL NAME : 97245 CONTINUATION # : PREVIOUS REEL : COMPIENT : ARCO ALASKA, INC., NIAKUK NK-25, API #50-029-22760-00 PAGE: **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/07/ 7 ORIGIN : FLIC TAPE NAME : 97245 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA, INC., NIAKUK NK-25, API #50-029-22760-00 TAPE HEADER NIAKUK MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION NK-25 500292276000 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 12-JUN-97 BIT RUN1 BIT RUN2 BIT RUN3 97245 97245 97245 ST. AMOUR ST. AMOUR ST. AMOUR WALLS PEAK PEAK SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 36 12N 1SE 1371 656 60.10 60.10 19.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) ................................ 8.500 9.625 16971.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 3RD STRING PRODUCTION STRING RE~KS: Well drilled 26-APR through O1-JUN-97 with MWD GR, CDR W/GR, and RAB/ADN. Data was collected in 9 bit runs. MWD GR acquired in runs 1-4 and field merged. CDR/GR acquired in run 5 (resistivity failed) and GR merged with MWD GR. Bit runs 6-9 were RAB/ADN. $ $ PAGE: **** FILE HEADER **** FILE NAFiE : EDIT .001 SERVICE : FLIC VERSION ' O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGEDMWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCRE~iENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 300.5 18111.0 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASD-REDDEPTH) BASELINE DEPTH MERGED DATA SOURCE LDWG TOOL CODE $ RE~ARKS: .......... EQUIVALENT UNSHIFTED DEPTH .......... MWD BIT RUN NO. MERGE TOP MERGE BASE 1 300.5 10965.0 2 10965.0 16971.0 3 16971.0 17401.0 4 17401.0 17632.5 5 17632.5 17794.5 6 17794.5 18111.0 No depth adjustments were made as per Daniel Schafer of ARCO. The MWD GR data in bit run 1 was merged in the field, as was bit run 2 data. The ADN quadrant outputs LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: are as follows: ROBB/ROBU/ROBL/ROBR are bottom, upper, left, and right quadrant density; and are also listed as RHO1, RH02, RH03, RH04 in the LDWG listing. The other outputs (Delta Rho, PEF, Max. Density) are listed with their quadrants as DRHB/DRHU/DRHL/DRHR, PEB/PEU/ PEL/PER, and ROM~/ROMU/ROML/ROMR. The LDWG outputs of CALA and CALS are HDIA and VDIA respectively. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 039631 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RING MWD OH~M 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RB1 MWD OH~4M 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RB2 MWD OH~M 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RB3 MWD OH~4~ 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RBITMWD OI~4M 039631 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 039631 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RHOBMWD G/C3 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RHO1 ~ G/C3 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RHO2MWD G/C3 039631 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 4 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) RH03 MWD G/C3 039631 O0 000 O0 0 1 1 1 4 68 0000000000 RH04 MWD G/C3 039631 O0 000 O0 0 1 1 1 4 68 0000000000 DRHOMWD G/C3 039631 O0 000 O0 0 1 1 1 4 68 0000000000 PEF MWD BN/E 039631 O0 000 O0 0 1 1 1 4 68 0000000000 DCALMWD IN 039631 O0 000 O0 0 1 1 1 4 68 0000000000 CALSMWD IN 039631 O0 000 O0 0 1 1 1 4 68 0000000000 CALAMWD IN 039631 O0 000 O0 0 1 1 1 4 68 0000000000 NPHIMWD PU-S 039631 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 18111.000 FET.MWD -999.250 RING.MWD -999.250 RB1.MWD -999.250 RB2.MWD -999.250 RB3.MWD -999.250 RBIT. MWD -999.250 ROP.MWD 9.070 GR.MWD -999.250 RHOB.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD -999.250 RHO4.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 DCAL.MWD -999.250 CALS.MWD -999.250 CALA.MWD -999.250 NPHI.MWD -999.250 DEPT. 18000.000 FET.MWD 0.713 RING.MWD 11.276 RB1.MWD 10.500 RB2.MWD 11.320 RB3.I4WD 8.710 RBIT. MWD 7.750 ROP.MWD 12.810 GR.MWD 52.182 RHOB.MWD 2.718 RHO1.MWD 2.703 RHO2.MWD 2.438 RHO3.MWD 2.565 RHO4.MWD 2.650 DRHO.MWD 0.005 PEF.MWD 3.929 DCAL.MWD 0.656 CALS.MWD 9.302 CALA.MWD 9.635 NPHI.MWD 0.135 DEPT. 17000.000 FET.MWD 3.828 RING.MWD 248.860 RB1.MWD 340.540 RB2.MWD 183.410 RB3.MWD 184.870 RBIT.MWD 325.310 ROP.MWD 34.740 GR.MWD 21.761 RHOB.MWD 2.652 RHO1.MWD 2.648 RHO2.MWD 2.444 RHO3.MWD 2.590 RHO4.MWD 2.529 DRHO.MWD 0.024 PEF.MWD 4.999 DCAL.MWD 0.540 CALS.MWD 9.469 CALA.MWD 9.202 NPHI.MWD 0.059 DEPT. 16000.000 FET.MWD -999.250 RING.MWD -999.250 RB1.MWD -999.250 RB2.MWD -999.250 RB3.MWD -999.250 RBIT.MWD -999.250 ROP.MWD -999.250 GR.MWD 162.080 RHOB.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD -999.250 RHO4.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 DCAL.MWD -999.250 CALS.MWD -999.250 CALA.MWD -999.250 NPHI.MWD -999.250 DEPT. 15000.000 FET.MWD -999.250 RING.MWD -999.250 RB1.MWD -999.250 RB2.MWD -999.250 RB3.MWD -999.250 RBIT.MWD -999.250 ROP.MWD -999.250 GR.MWD 145.880 RHOB.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD -999.250 RHO4.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 DCAL.MWD -999.250 CALS.MWD -999.250 CALA.MWD -999.250 NPHI.MWD -999.250 DEPT. 14000.000 FET.MWD -999.250 RING.MWD -999.250 RB1.MWD -999.250 RB2.MWD -999.250 RB3.MWD -999.250 RBIT.MWD -999.250 ROP.MWD -999.250 GR.MWD 118.620 RHOB.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD -999.250 RHO4.MWD -999.250 DRHO.MWD -999.250 PEF.MWD -999.250 DCAL.MWD -999.250 CALS.MWD -999.250 CALA.MWD -999.250 NPHI.MWD -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: DEPT. 13000. 000 FET.MWD RB 2 . MWD -999. 250 RB 3 . MWD GR.MWD 104. 050 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL. MWD - 999.250 CABS. MWD DEPT. 12000. 000 FET.MWD RB2. MWD - 999. 250 RB3 . MWD GR.MWD 105. 450 RHOB.MWD RH03 .MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 11000. 000 FET.MWD RB2 .MWD -999. 250 RB3 .MWD GR.MWD 92. 710 RHOB.MWD RH03 .I~WD -999.250 RHO4.MWD DCAb. MWD -999. 250 CALS ,MWD DEPT. 10000.000 FET.MWD RB2.MWD -999.250 RB3,MWD GR.MWD 61.490 RHOB,MWD RHO3.MWD -999.250 RHO4,MWD DCAL.MWD -999.250 CALS.MWD DEPT. 9000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 32.615 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 8000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 77.980 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 7000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 82.170 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 6000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 106.450 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 5000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 85.287 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD -999.250 RING.MWD -999.250 RBIT. MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT. MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 RB1. MWD ROP. MWD RH02 . MWD PEF.MWD NPHI . MWD RB1 .MWD ROP. MWD RH02 . MWD PEF. MWD NPHI.MWD RB1. MWD ROP. MWD RH02. MWD PEF. MWD NPHI.MWD RB1.MWD ROP.MWD RHO2.MWD PEF.MWD NPHI.MWD RB1.MWD ROP.MWD RHO2.MWD PEF.MWD NPHI.MWD RB1.MWD ROP.MWD RHO2.MWD PEF.MWD NPHI.MWD RB1.MWD ROP.MWD RHO2.MWD PEF.MWD NPHI.MWD RB1.MWD ROP.MWD RHO2.MWD PEF.MWD NPHI.MWD RB1.MWD ROP.MWD RHO2.MWD PEF.MWD NPHI.MWD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: DEPT. 4000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 48.660 RHOB.I4WD RHO3.A~4D -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 3000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 67.106 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 2000.000 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 46.130 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 1000.000 FET.MWD RB2.MWD -999.250 RB3.14WD GR.MWD 64.930 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD DEPT. 300.500 FET.MWD RB2.MWD -999.250 RB3.MWD GR.MWD 25.970 RHOB.MWD RHO3.MWD -999.250 RHO4.MWD DCAL.MWD -999.250 CALS.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RING.MWD -999.250 RBIT.MWD -999.250 RHO1.MWD -999.250 DRHO.MWD -999.250 CALA.MWD -999.250 RB1.MWD -999.250 ROP.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RB1.MWD -999.250 ROP.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RB1.MWD -999.250 ROP.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RB1.MWD -999.250 ROP.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 RB1.MWD -999.250 ROP.MWD -999.250 RHO2.MWD -999.250 PEF.MWD -999.250 NPHI.MWD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: FILE HEADER FILE NUMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 300.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10965.0 1-JUN-97 FAST 4.0 4.0C REAL-TIME 18010.0 300.0 18010.0 1.0 66.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GANmIA RAY $ TOOL NUMBER MWD GR BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 16971.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.40 MUD VISCOSITY (S) : 45.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHT4~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): 2. 550 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT) : 1. 960 MUD CAKE AT (MT): 72.0 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD GR/CDR GR 300' TO 16971' RAB/ADN RUN 1 16971' - 17401' RAB/ADN RUN 2 17401 ' - 17633 ' RAB/ADN RUN 3 17633' - 17795' RAB/ADN RUN 4 17795' - 18010' CDR/GR RUN 10965' -16971 ' RES. FAILED 13.325" CSG SET AT 7750' DATA FROM DOWNHOLE MEMORY, V4. OC SOFTWARE **THIS FILE IS THE MWD GR*** $ LIS FORMAT DATA DATA FORMAT SPECIFICATION RECORD ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 039631 O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI 039631 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: DEPT. 10965.000 GR.LW1 84.380 DEPT. 10000.000 GR.LW1 61.490 DEPT. 9000.000 GR.LW1 32.615 DEPT. 8000. 000 GR. LW1 77. 980 DEPT. 7000. 000 GR. LW1 82.170 DEPT. 6000.000 GR.LW1 106.450 DEPT. 5000. 000 GR. LW1 85. 287 DEPT. 4000.000 GR.LW1 48.660 DEPT. 3000. 000 GR.LW1 67.106 DEPT. 2000. 000 GR.LW1 46. 130 DEPT. 1000. 000 GR. LW1 64. 930 DEPT. 300. 500 GR. LW1 25. 970 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER RAW MWD LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 10 Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SOW~JARY VENDOR TOOL CODE START DEPTH MWD 10965.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (I~EMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) '. HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 16971.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CDR RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 1 -JUN-97 FAST 4.0 4.0 RIEMOR Y 18010.0 300.0 18010.0 135 62.1 66.9 TOOL NUMBER RGS 8039 8.500 16971.0 LSND 9.40 45.0 2. 550 72.0 1. 960 72.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 REMARKS: MWD GR/CDR GR 300' TO 16971' RAB/ADN RUN 1 16971' - 17401' RAB/ADN RUN 2 17401' - 17633' RAB/ADN RUN 3 17633' - 17795' RAB/ADN RUN4 17795' - 18010' CDR/GR RUN10965'-16971' RES. FAILED 13.325" CSG SET AT 7750' DATA FROM DOWNHOLE MEMORY, V4.0C SOFTWARE **** THIS FILE IS THE CDR GR*** $ LIS FORMAT DATA PAGE: 11 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 039631 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 039631 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 12 DEPT. 16912.000 GR.LW2 226.500 DEPT. 16000. 000 GR. LW2 162. 080 DEPT. 15000. 000 GR. LW2 145. 880 DEPT. 14000.000 GR.LW2 118.620 DEPT. 13000. 000 GR. LW2 DEPT. 12000.000 GR.LW2 DEPT. 11000. 000 GR. LW2 DEPT. 10965.000 GR.LW2 104. 050 105. 450 92.710 84. 380 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 0 O1 CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ~ER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUAmIARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 16796.0 17401.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 13 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 1-JUN-97 FAST 4.0 4.0C MEMORY 18010.0 300.0 18010.0 67 60.0 62.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE RAB AZIM. RESIST./GR ADN DENS./NEUT. $ TOOL NUMBER RAB-ENP1 ADN045 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 16971.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.40 MUD VISCOSITY (S) : 45.0 MUD PH: MUD CHLORIDES (PPM) : 500 FLUID LOSS (C3): RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2. 550 MUD AT MAX CIRC~TIONG TEMPERATURE : MUD FILTRATE AT (MT): 1. 960 MUD CAKE AT (MT): 72.0 72.0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.5 REMARKS: MWD OR/CDR GR 300' TO 16971' RAB/ADN RUN 1 16971' - 17401' RAB/ADN RUN 2 17401' - 17633' RAB/ADN RUN 3 17633' - 17795' RAB/ADN RUN 4 17795' - 18010' CDR~OR RUN 10965' -16971 ' RES. FAILED 13.325" CSG SET AT 7750' DATA FROM DOWNHOLE MEMORY, V4. OC SOFTWARE LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 14 ****THIS IS RAB/ADN RUN 1'*** $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 112 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 039631 O0 000 O0 0 4 1 1 4 68 0000000000 RING LW3 OPL~M 039631 O0 000 O0 0 4 1 1 4 68 0000000000 RSM LW3 OPZ~M 039631 O0 000 O0 0 4 1 1 4 68 0000000000 R2ViMLW3 OH~ff4039631 O0 000 O0 0 4 1 1 4 68 0000000000 RDM LW3 Otff4M039631 O0 000 O0 0 4 1 1 4 68 0000000000 RBIT LW3 OH~M 039631 O0 000 O0 0 4 1 1 4 68 0000000000 ROPE LW3 F/HR 039631 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 039631 O0 000 O0 0 4 1 1 4 68 0000000000 TAB LW3 HR 039631 O0 000 O0 0 4 1 1 4 68 0000000000 ROMB LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 ROBB LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 ROBU LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 ROBL LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 ROBR LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 DRHB LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 DRHULW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 DRHL LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 DRHR LW3 G/C3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 15 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 4 1 1 4 68 0000000000 PEB LW3 039631 PEU LW3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 PEL LW3 039631 O0 000 O0 0 4 1 1 4 68 0000000000 PER LW3 039631 O0 000 O0 0 4 I 1 4 68 0000000000 CALN LW3 IN 039631 O0 000 O0 0 4 1 1 4 68 0000000000 TNPH LW3 PU 039631 O0 000 O0 0 4 1 1 4 68 0000000000 DCAL LW3 IN 039631 O0 000 O0 0 4 1 1 4 68 0000000000 RDIA LW3 IN 039631 O0 000 O0 0 4 1 1 4 68 0000000000 VDIA LW3 IN 039631 O0 000 O0 0 4 1 1 4 68 0000000000 RPM LW3 RPM 039631 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 17401.500 RING.LW3 -999.250 RSM. LW3 -999.250 RM~.LW3 RDM. LW3 -999.250 RBIT.LW3 -999.250 ROPE. LW3 13.062 GR.LW3 TAB.LW3 -999.250 ROMB.LW3 -999.250 ROBB.LW3 -999.250 ROBU. LW3 ROBL.LW3 -999.250 ROBR.LW3 -999.250 DRHB.LW3 -999.250 DRHU. LW3 DRHL.LW3 -999.250 DRHR.LW3 -999.250 PEB.LW3 -999.250 PEU.LW3 PEL.LW3 -999.250 PER.LW3 -999.250 CALN. LW3 -999.250 TNPH.LW3 DCAL.LW3 -999.250 PZDIA.LW3 -999.250 VDIA.LW3 -999.250 RPM. LW3 DEPT. 17000.000 RING.LW3 248.860 RSM. LW3 340.540 PJ4M. LW3 RDM. LW3 184.870 RBIT. LW3 325.310 ROPE. LW3 33.211 GR.LW3 TAB. LW3 3. 828 ROMB. LW3 2. 652 ROBB. LW3 2. 648 ROBU. LW3 ROBL.LW3 2.590 ROBR.LW3 2.529 DRHB.LW3 O. 024 DRHU. LW3 DRHL.LW3 0.076 DRHR.LW3 0.053 PEB.LW3 4.999 PEU. LW3 PEL.LW3 4.978 PER.LW3 5.120 CALN. LW3 8.540 TNPH.LW3 DCAL.LW3 0.540 HDIA.LW3 9.202 VDIA.LW3 9.469 RPM. LW3 DEPT. 16796.000 RING.LW3 -999.250 RSM. LW3 -999.250 PaviM. LW3 RDM. LW3 -999.250 RBIT.LW3 -999.250 ROPE. LW3 -999.250 GR.LW3 TAB.LW3 -999.250 ROMB.LW3 -999.250 ROBB.LW3 -999.250 ROBU. LW3 ROBL. LW3 -999. 250 ROBR. LW3 -999. 250 DRHB. LW3 - 999. 250 DRHU. LW3 DRHL.LW3 -999.250 DRHR.LW3 -999.250 PEB.LW3 -999.250 PEU. LW3 PEL.LW3 -999.250 PER.LW3 -999.250 CALN.LW3 -999.250 TNPH.LW3 DCAL.LW3 -999.250 HDIA.LW3 -999.250 VDIA.LW3 -999.250 RPM. LW3 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 183 410 21 292 2 444 0 128 5 145 5 900 112 167 -999.250 -999.250 -999.250 -999.250 -999.250 48.500 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 16 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE '. 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE I~JM~ER 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NU~fl~ER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ~41WD 17401.0 17632.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) '. HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE RAB AZIM. RESIST./GR ADN DENS./NEUT. $ 1-JUN-97 FAST 4.0 4. OC MEMORY 18010.0 300.0 18010.0 67 60.0 62.1 TOOL NUMBER RAB-ENP1 ADN04$ LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 17 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 16971.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.40 MUD VISCOSITY (S) : 45.0 MUD PH: MUD CHLORIDES (PPM) : 500 FLUID LOSS (C3): RESISTIVITY (OIfl~M) AT TEMPERATURE (DEGF) : MUD AT I~EAS~ TEMPERATURE (MT): 2. 550 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): 1. 960 MUD CAKE AT (MT): NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.5 REMARKS: MWD GR/CDR GR 300' TO 16971' RAB/ADN RUN 1 16971' - 17401' RAB/ADN RUN 2 17401' - 17633' RAB/ADN RUN 3 17633' - 17795' RAB/ADN RUN 4 17795' - 18010' CDR/GR RUN 10965'-16971' RES. FAILED 13.325" CSG SET AT 7750' DATA FROM DOWNTtOLE MEMORY, V4. OC SOFTWARE ****THIS IS RAB/ADN RUN 2**** $ LIS FORMAT DATA 72.0 72.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 112 4 66 1 5 66 6 73 7 65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 18 TYPE REPR CODE VALUE 8 68 O. 5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN * * NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 039631 O0 000 O0 0 5 1 1 4 68 0000000000 RING LW4 OH~ 039631 O0 000 O0 0 $ 1 1 4 68 0000000000 RSM LW4 Otk4M 039631 O0 000 O0 0 5 1 1 4 68 0000000000 ~ LW4 OPi~I 039631 O0 000 O0 0 5 1 1 4 68 0000000000 RDM LW4 Ott~I 039631 O0 000 O0 0 5 1 1 4 68 0000000000 RBIT LW4 OHMM 039631 O0 000 O0 0 $ 1 1 4 68 0000000000 ROPE LW4 F/HR 039631 O0 000 O0 0 5 1 1 4 68 0000000000 GR LW4 GAPI 039631 O0 000 O0 0 5 1 1 4 68 0000000000 TAB LW4 HR 039631 O0 000 O0 0 5 1 1 4 68 0000000000 ROMB LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 ROBB LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 ROBU LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 ROBL LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 ROBR LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 DRHB LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 DRHU LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 DRHL LW4 G/C3 039631 O0 000 O0 0 5 1 1 4 68 0000000000 DRHR LW4 G/C3 039631 O0 000 O0 0 $ 1 1 4 68 0000000000 PEB LW4 039631 O0 000 O0 0 5 1 1 4 68 0000000000 PEU LW4 039631 O0 000 O0 0 5 1 1 4 68 0000000000 PEL LW4 039631 O0 000 O0 0 5 1 1 4 68 0000000000 PER LW4 039631 O0 000 O0 0 5 1 1 4 68 0000000000 CALN LW4 IN 039631 O0 000 O0 0 5 1 1 4 68 0000000000 TNPH LW4 PU 039631 O0 000 O0 0 5 1 1 4 68 0000000000 DCAL LW4 IN 039631 O0 000 O0 0 5 1 1 4 68 0000000000 HDIA LW4 IN 039631 O0 000 O0 0 $ 1 1 4 68 0000000000 VDIA LW4 IN 039631 O0 000 O0 0 5 1 1 4 68 0000000000 RPM LW4 RPM 039631 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 19 DEPT. 17632. 500 RING.LW4 RDM. LW4 -999. 250 RBIT. LW4 TAB. LW4 -999. 250 ROMB. LW4 ROBL. LW4 -999. 250 ROBR. LW4 DRHL. LW4 -999. 250 DRHR. LW4 PEL.LW4 -999.250 PER.LW4 DCAL. LW4 -999. 250 HI)IA. LW4 DEPT. 17295. 500 RING. LW4 RDM. LW4 -999. 250 RBIT. LW4 TAB.LW4 -999.250 ROMB.LW4 ROBL. LW4 -999. 250 ROBR. LW4 DRHL.LW4 -999.250 DRHR.LW4 PEL . LW4 ~ 999.250 PER. LW4 DCAL. LW4 -999. 250 HDIA. LW4 -999. 250 RSM. LW4 -999. 250 ROPE. LW4 -999. 250 ROBB. LW4 -999. 250 DRHB. LW4 -999. 250 PEB. LW4 -999. 250 CALN. LW4 -999. 250 VDIA. LW4 -999. 250 RSM. LW4 -999. 250 ROPE. LW4 - 999.250 ROBB. LW4 -999. 250 DRHB. LW4 -999. 250 PEB. LW4 -999. 250 CALN. LW4 -999. 250 VDIA. LW4 -999.250 RM~I. LW4 10.576 GR.LW4 -999.250 ROBU. LW4 -999.250 DRHU. LW4 -999.250 PEU. LW4 -999.250 TNPH. LW4 -999.250 RPM. LW4 -999.250 P~4~.LW4 -999. 250 GR. LW4 - 999. 250 ROBU. LW4 -999. 250 DRHU. LW4 -999. 250 PEU. LW4 -999. 250 TNPH. LW4 -999. 250 RPM. LW4 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 5.800 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION · O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN ~ER: 5 DEPTH INCRE~IENT: 0.5000 FILE SU~IARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 17632.0 17794.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 20 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (B~E~IORY or REAL-TIME) TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE '. TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE RAB AZIM. RESIST./GR ADN DENS./NEUT. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 1 -JUN-97 FAST 4.0 4. OC MEMORY 18010.0 300.0 18010.0 67 60.0 62.1 TOOL NUMBER RAB-ENP1 ADN045 8.500 16971.0 BOREHOLE CONDITIONS ~ TYPE: LSND MUD DENSITY (LB/G): 9.40 MUD VISCOSITY (S) : 45.0 MUD PH: MUD CHLORIDES (PPM) : 500 FLUID LOSS (C3): RESISTIVITY (OIfl~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2. 550 MUD AT MAX CIRCULATIONG TEMPERATURE '. MUD FILTRATE AT (MT): 1. 960 MUD CAKE AT (MT): NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS 0.5 MWD GR/CDR GR 300' TO 16971 ' RAB/ADN RUN 1 16971 ' - 17401 ' RAB/ADN RUN 2 17401' - 17633' RAB/ADN RUN 3 17633' - 17795' RAB/ADN RUN 4 17795' - 18010' CDR/GR RUN 10965'-16971' RES. FAILED 13.325" CSG SET AT 7750' DATA FROM DOWNHOLE MEMORY, V4. OC SOFTWARE 72.0 72.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 21 ****THIS IS RAB/ADN RUN 3**** $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 112 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT ll 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 039631 O0 000 O0 0 6 1 1 4 68 0000000000 RING LW$ OHMM 039631 O0 000 O0 0 6 1 1 4 68 0000000000 RSM LW$ Ob?4M039631 O0 000 O0 0 6 1 1 4 68 0000000000 Rk4M LW$ OHMM 039631 O0 000 O0 0 6 1 1 4 68 0000000000 RDM LW5 OHM~ 039631 O0 000 O0 0 6 1 1 4 68 0000000000 RBIT LW5 OPiMM 039631 O0 000 O0 0 6 1 1 4 68 0000000000 ROPE LW5 F/HR 039631 O0 000 O0 0 6 1 1 4 68 0000000000 GR LW5 GAPI 039631 O0 000 O0 0 6 1 1 4 68 0000000000 TAB LW5 HR 039631 O0 000 O0 0 6 1 1 4 68 0000000000 ROMBLW$ G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 ROBB LW5 G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 ROBU LW5 G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 ROBL LW5 G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 ROBR LW5 G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 DRHB LW5 G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 DRHU LW$ G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 DRHL LW5 G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 DRHR LW5 G/C3 039631 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 22 NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) PEB LW5 039631 O0 000 O0 0 6 1 1 4 68 0000000000 PEU LW5 039631 O0 000 O0 0 6 1 1 4 68 0000000000 PEL LW5 039631 O0 000 O0 0 6 1 1 4 68 0000000000 PER LW5 039631 O0 000 O0 0 6 1 1 4 68 0000000000 CALNLW5 IN 039631 O0 000 O0 0 6 1 1 4 68 0000000000 TNPH LW5 PU 039631 O0 000 O0 0 6 1 1 4 68 0000000000 DCALLW5 IN 039631 O0 000 O0 0 6 1 1 4 68 0000000000 H~IA LW5 IN 039631 O0 000 O0 0 6 1 1 4 68 0000000000 VDIA LW5 IN 039631 O0 000 O0 0 6 1 1 4 68 0000000000 RPM LW5 RPM 039631 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 17794.500 RING.LW5 -999.250 RSM. LW5 -999.250 RI~.LW5 RDM. LW5 -999.250 RBIT.LW5 -999.250 ROPE. LW5 12.422 GR.LW5 TAB.LW5 -999.250 ROMB.LW5 -999.250 ROBB.LW5 -999.250 ROBU.LW5 ROBL.LW5 -999.250 ROBR.LW5 -999.250 DRHB.LW5 -999.250 DRHU.LW5 DRHL.LW5 -999.250 DRHR.LW5 -999.250 PEB.LW5 -999.250 PEU. LW5 PEL. LW5 -999. 250 PER. LW5 - 999. 250 CALN. LW5 - 999. 250 TNPH. LW5 DCAL.LW5 -999.250 HDIA.LW5 -999.250 VDIA.LW5 -999.250 RPM. LW5 DEPT. 17478.500 RING.LW5 -999.250 RSM. LW5 -999.250 Pd~4. LW5 RDM. LW5 -999.250 RBIT.LW5 -999.250 ROPE.LW5 -999.250 GR.LW5 TAB.LW5 -999.250 ROMB.LW5 -999.250 ROBB.LW5 -999.250 ROBU. LW5 ROBL. LW5 -999. 250 ROBR. LW5 -999. 250 DRHB. LW5 - 999. 250 DRHU. LW5 DRHL.LW5 -999.250 DRHR.LW5 -999.250 PEB.LW5 -999.250 PEU. LW5 PEL. LW5 -999. 250 PER. LW5 -999. 250 CALN. LW5 - 999. 250 TNPH. LW5 DCAL.LW5 -999.250 P~DIA.LW5 -999.250 VDIA.LW5 -999.250 RPM. LW5 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 9.800 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE - FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 7-JUL-1997 10:13 PAGE: 23 FILE HEADER FILENUMBER 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: 0.5000 FILE SU~gr~n_RY VENDOR TOOL CODE START DEPTH STOP DEPTH 17794.0 18111.0 LOG HEADER DATA DATE LOGGED: 1 - JUN- 97 SOFTWARE: SURFACE SOFTWARE VERSION: FAST 4.0 DOWN-HOLE SOFTWARE VERSION: 4. OC DATA TYPE (I~EMORY or REAL-TIME): MEMORY TD DRILLER (FT): 18010.0 TOP LOG INTERVAL (FT): 300.0 BOTTOM LOG INTERVAI~ (FT) : 18010.0 BIT ROTATING SPEED (RPM) '. 67 HOLE INCLINATION (DEG) MINIMUM ANGLE: 60.0 MAXIMUM ANGLE: 62.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE RAB AZIM. RESIST./GR ADN DENS./NEUT. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: TOOL NUMBER RAB-ENP1 ADN045 8.500 16971.0 LSND 9.40 45.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 MUD CHLORIDES (PPM) : 500 FLUID LOSS (C3): RESISTIVITY (OH~ff4) AT TEMPERATURE (DEGF) : MUD AT I~iEASURED TEMPERATURE (MT): 2. 550 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): 1. 960 MUD CAKE AT (MT): NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 MOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.5 R~S: MWD GR/CDR GR 300' TO 16971' RAB/ADN RUN 1 16971' - 17401' RAB/ADN RUN 2 17401' - 17633' ~/ADN RUN 3 17633' - 17795' RAB/ADN RUN 4 17795' ~ 18010' CDR/GR RUN 10965'-16971' RES. FAILED 13.325" CSG SET AT 7750' DATA FROM DOWNHOLE MEMORY, V4. OC SOFTWARE ****THIS IS RAB/ADN RUN 4**** $ LIS FORMAT DATA 72.0 72.0 PAGE: 24 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 112 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUmB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 039631 RING LW6 OH~4~ 039631 RSM LW6 OH~ 039631 ~ LW6 OH~ 039631 RDM LW6 OH~ 039631 RBIT LW6 OH~I 039631 ROPE LW6 F/HR 039631 GR LW6 GAPI 039631 TAB LW6 HR 039631 ROM LW6 G/C3 039631 ROBB LW6 G/C3 039631 ROBU LW6 G/C3 039631 ROBL LW6 G/C3 039631 ROBR LW6 G/C3 039631 DRHB LW6 G/C3 039631 DRHU LW6 G/C3 039631 DRHL LW6 G/C3 039631 DRHR LW6 G/C3 039631 PEB LW6 039631 PEU LW6 039631 PEL LW6 039631 PER LW6 039631 CALN LW6 IN 039631 TNPH LW6 PU 039631 DCAL LW6 IN 039631 H~IA LW6 IN 039631 VDIA LW6 IN 039631 RPM LW6 RPM 039631 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 O0 000 O0 0 7 1 1 4 68 0000000000 25 DATA ** DEPT. 18111.000 RING.LW6 -999.250 RSM. LW6 -999.250 PJ4~.LW6 RDM. LW6 -999.250 RBIT.LW6 -999.250 ROPE.LW6 9.070 GR.LW6 TAB.LW6 -999.250 ROMB.LW6 -999.250 ROBB.LW6 -999.250 ROBU. LW6 ROBL.LW6 -999.250 ROBR.LW6 -999.250 DRHB.LW6 -999.250 DRHU. LW6 DRHL.LW6 -999.250 DRHR.LW6 -999.250 PEB.LW6 -999.250 PEU. LW6 PEL.LW6 -999.250 PER.LW6 -999.250 CALN. LW6 -999.250 TNPH. LW6 DCAL.LW6 -999.250 HDIA.LW6 -999.250 VDIA.LW6 -999.250 RPM. LW6 DEPT. 18000. 000 RING.LW6 11.276 RSM. LW6 10.500 RI~.LW6 RDM. LW6 8. 710 RBIT. LW6 7. 750 ROPE.LW6 12. 810 GR. LW6 TAB.LW6 O. 713 ROMB.LW6 2. 718 ROBB.LW6 2. 703 ROBU. LW6 ROBL. LW6 2.565 ROBR. LW6 2.650 DRHB. LW6 O. 005 DRHU. LW6 DRHL.LW6 O. 101 DRHR.LW6 O. 057 PEB.LW6 3. 929 PEU. LW6 PEL.LW6 5.517 PER.LW6 4. 770 CALN. LW6 8. 656 TNPH.LW6 DCAL.LW6 O. 656 HDIA.LW6 9. 635 VDIA.LW6 9. 302 RPM.LW6 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 11 320 56 661 2 438 0 130 7 427 13 500 69 000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-JUL-1997 10:13 PAGE: 26 DEPT. 17662. 000 RING. LW6 RDM. LW6 -999. 250 RBIT. LW6 TAB. LW6 - 999. 250 RO~i~. LW6 ROBL. LW6 -999.250 ROBR. LW6 DRHL. LW6 - 999. 250 DRHR. LW6 PEL.LW6 -999.250 PER.LW6 DCAL. LW6 -999. 250 ~DIA. LW6 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999.250 RSM. LW6 ROPE. LW6 ROBB. LW6 DRHB. LW6 PEB. LW6 CALN. LW6 VDIA. LW6 -999.250 Pd~4. LW6 -999.250 GR.LW6 -999.250 ROBU. LW6 -999.250 DRHU.LW6 -999.250 PEU. LW6 -999.250 TNPH. LW6 -999.250 RPM. LW6 -999 -999 -999 -999 -999 6 -999 25O 25O 250 25O 250 4O0 250 ** END OF DATA ** * * * * FILE TRAILER * *** FILE NAME : EDIT .007 SERVICE ' FLIC VERSION : O01CO1 DATE : 97/07/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/07/ 7 ORIGIN : FLIC TAPE NAME : 97245 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT : ARCO ALASKA, INC. , NIAKUK NK-25, API #50-029-22760-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE · 97/07/ 7 ORIGIN ' FLIC REEL NAME : 97245 CONTINUATION # : PREVIOUS REEL : COI~4F29T : ARCO ALASKA, INC. , NIAKUK NK-25, API #50-029-22760-00