Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
205-002
XHVZE . . Image Project Well History File Cover Page This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cQ{)5 - 00 d- Well History File Identifier Organizing (done) D Two-sided ""1111111" 11111I D Rescan Needed II 11111111111111111 RESCAN ~olor Items: D Greyscale Items: DIGITAL DATA ~kettes, No. ~ D Other, No/Type: OVERSIZED (Scannable) D Maps: D Other Items Scannable by a Large Scanner D Poor Quality Originals: D Other: OVERSIZED (Non-Scannable) D Logs of various kinds: NOTES: Date 3 , 15/07 D Other:: rnP I,~IIIIIIIIIII~ 11111 VV1 r BY: ~ 151 Project Proofing Scanning Preparation BY: 0 Maria ) Date~1 ISJ07 ~ x30=&D Date: 3} ISJ07 + I 0 = TOTAL PAGES 70 (Count does not include cover sheet) 11111 ìD 151 V r , ,- 11111111111111" III BY: ~ Production Scanning Stage 1 Page Count from Scanned File: 7 j (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES ~ Date:3 J 1:ç}D 7 If NO in stage 1, page(s) discrepancies were found: YES NO 151 \111' r NO BY: Stage 1 BY: Maria Date: 151 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked 111111111I111111111 10/6/2005 Well History File Cover Page. doc STATE OF ALASKA ALASKA~AND GAS CONSERVATION COMMISS~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other Q Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ MILL Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-ente Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development Q Exploratory ^ 205-0020 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-22571-01-00 8. Property Designation (Lease Number) : ~ 9. Well Name and Number: ADLO 02$280 ~ PBU E-37A - 10. Field/Pool(s): PRUDH OE BAY FIELD 7 PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 13130 feet Plugs (measured) 12435' 7/27/05 feet true vertical 8939.73 feet Junk (measured) None feet Effective Depth measured 13038 feet Packer (measured) 9990 true vertical 8939.47 feet (true vertical) 8561 Casing Length Size MD TVD .Burst Collapse Structural Conductor 105 20" 91.5# H-40 SURFACE - 105 SURFACE - 105 1490 470 Surface 3798 10-3/4" 45.5# NT80 35 - 3798 35 - 3617 5210 2480 Intermediate 10215 7-5/8" 29.7# L-80 32 - 10215 32 - 8703 6890 4790 Production Liner 3089 4-1/2" 12.6# L-80 10040 - 13129 8593 - 8940 8430 7500 Liner Perforation depth: Measured depth: 11340 - 12340 12710 - 13030 10785 - 10910 = _ True Vertical depth: 8993.46 - 8963.24 8943.56 - 8939.45 8975.24 - 9001.35 = _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13-CR SURFACE - 10048 SURFACE - 8598 Packers and SSSV (type, measured and true vertical depth) 7-5/8"X4-1/2" BKR S-3 PKR 9990 8561 ~~VED 12. Stimulation or cement squeeze summary: Intervals treated (measured): ~ .. ; i { ~ ~ ` „_ ~ ~E~: ~ ~ 4iU(~ 2~ R 2010 ~:~ ~ ~ ~~ ~:~ Treatment descriptions including volumes used and final pressure: ;~I~SI(S Q;{ ~ W~$ ia~ia. Comrrns$lon ~r!ch~sra e 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 544 17606 66 232 Subsequent to operation: SI 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development Q Service ^ Daily Report of Well Operations X .Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date .6/28/2010 vnn ~„-•.,,•. ~wcvwcu ~iwvo ....JL,~rt,7 JUIY ~ '~ ~~(~ y, ~1. Itcl' l E-37A 205-002 PERF ATTACHMENT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base E-37A 1/27/05 PER 11,340. 12,340. 8,993.46 8,963.24 E-37A 1/27/05 PER 12,710. 13,030. 8,943.56 8,939.45 E-37A 7/27/05 BPS 12,435. 13,044. 8,951.57 8,939.48 E-37A 10/28/06 APF 10,785. 10,910. 8,975.24 9,001.35 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • E-37A • DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 5/27/2010iCTU 9 1.75" CT Job Scope: Pre-CTD WS Drift. MIRU CTU. MU Drift BHA, put a caliper on drift @ 3.685" OD and drift was stenciled with same OD. Had BTT Hand call shop to verify we have the right drift and we have a 100% guarantee that this drift @ 3.685" is the correct drift for the WS. MU Drift BHA and RIH. RIH clean past X-N but tagged u 10,951' --30' below KB PKR de th uncorrected .Tried I betting through but not making any progress. Call APE to discuss what he would like us to do. POOH for motor & mill to mill X-N and clean out to 11,200'. MU and j RIH with 3.79" diamond parabolic mill and LH motor. ***Job Continued on 28 May 10"*" 5/28/2010'. CTU #9 w/ 1.75" CT: from 27 May 10 WSR Cleanout obstruction Job Scope: Pre-CTD WS Drift /Mill XN / FCO: Continued . Mill out XN nipple with 3.79" diamond parabolic mill., mill. Freeze protect tubing with 38 Bbls of 50/50 McOH. Mill No-Go'ed 3.78" and String Reamer No-Go'ed at 3.77" after milling/drift. RDMO coil unit. "**Job Complete*** FLUIDS PUMPED BBLS 507 1 % XS KCL W/SL 222 50/50 MEOH 729 Total 1= = CMJ WELLHEAD = ,FMC ACTUATOR = , BAKER KB. ELEV = ' 64.1' BF. ELEV = 29' KOP = 10214' Max Angle = 98 @ 12405' Datum MD = 10485' Datum TV D = 8800' SS SAFETY N . WELBORE 70° @ 10633' *"" 4-1 /2 E -3 7 A CHROME TBG*** 10-3/4" CSG, 45.5#, NT-80, ID = 9.953" ~-~ $79$' I EST TOP OF CEMENT Minimum ID = 3.725 @ 10035' 4-1 /2" HES XN NIPPLE 4-1/2"TBG, 12.6#, 13-CRVAMTOP,I 10048' .0152 bpf, ID = 3.958" WHIPSTOCK (TAGGED 01/17/05) ( (EZSV (TAGGED 01/17/05) FISH- TAILPIPE (CIPB, 2-NIPPLES, &WLEG) 01!31/05 SIDETRACK 7-5/8" CSG, 29.7#, S-95, ID = 6.875" 10744' PERFORATION SUMMARY REF LOG: MWD ON ??? ANGLE AT TOP PERF: 76 @ 10785' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 10785 - 10910 O 10/28/06 2-112" 4 11340- 12340 O 01/27!05 2-7/$" 4 12710 - 13030 C 01/27!05 ~4-1/2" HES X NIP, ID = 3.813" ~ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3380 3276 33 KBG DMY BK 0 8124/09 3 6299 5626 37 KBG DMY BK 0 8/24109 2 8373 7278 37 KBG DMY BK 0 1/29/05 1 9899 8498 45 KBG DMY BK 0 1/29/05 996$' -) 4-1 /2" HES X NIP, ID = 3.813" 9990' 7-5/8" X 4-1/2" BKR S-3 PKR, ID = 3.850" 10014' 4-1/2" HES X NIP, ID = 3.813", 79" 10035' 4-112" HES XN NIP, ID = 3.~~~~~ (MILLED OUT 05128/10) 10040' 7-5/8" X 5" BKR ZXP LTP w! HMC LNR HGR, ID = 4.400" 10048' 4-1/2" WLEG, ID = 3.958" 10004' 5" X 4-1/2" XO, ID = 3.954 MILLOUT WINDOW (E-37A) 10214' - 10226' 12435' I-j4-112"CIBP(SET 07/27/05) I PBTD 13044' 4-112" SOLID LNR, 12.6#, L-80 IBT-M, .0152 bpf, ID = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS 08!04!95 ORIGINAL COMPLETION 10!02/09 DAV/PJC GLV C/O (08/24/09) 01/31/05 N7ES SIDETRACK"A" 07/26/05 RWUPJC GLV CIO 07/27105 KEY/PJC SET BKR CIBP @ 12435' 10/28106 SGS/PAG ADPERFS 03/05/07 MWS/PJC DRLG DRAFT CORRECTIONS PRUDHOE BAY UNIT WELL: E37A PERMfT No: 2050020 API No: 50-029-22571-01 SEC 6, T11 N, R14E, 3391' FSL & 881' FEL BP Exploration (Alaska) OPERABLE: E-37A (PTD #205~0) Sustained casing pressure mitigate~ Page 1 of 2 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.comj Sent: Thursday, August 27, 2009 10:58 PM To: GPB, Area Mgr Centrai (GC1/3/FS3); GPB, GC1 OTL; GPB, GC1 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Weils Opt Eng; GPB, Optimization Engr; Ramsay, Gavin; Regg, James B(DOA); Maunder, Thomas E(DOA); Schwartz, Guy L (DOA) Cc: Quy, Tiffany; Holt, Ryan P(ASRC); NSU, ADW Well Integrity Engineer Subject: OPERABLE: E-37A (PTD #2050020) Sustained casing pressure mitigated AlI, Well E-37A (PTD #2050020) has had the sustained casing pressure mitigated. Dummy as lift valves were set on 08/24/09 and the well passed an MIT-IA on 08/26/09 to confirm the well's integrity. The we as~n re- classified as Operable and can be brought oniine when convenient for Operations. Please contact me with any questions or comments. Thank you, Taylor Taylor Wellman filling in for Anna Dube/Torin Roschinger Office: 659-5102 ~ - ~ . ! ~~~~-" ~ `:»,~„~:., , ... Pager: 659-5100 x 1154 From: NSU, ADW Well Integrity Engineer Sent: Sunday, August 16, 2009 8:29 PM To: GPB, Area Mgr Central (GCl/3/FS3); GPB, GCl OTL; GPB, GCl Welipad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; Ramsay, Gavin; 'Regg, James B(DOA)'; 'Maunder, Thomas E(DOA)'; 'Schwar~, Guy (DOA) <g uy. schwa rtz@alaska.gov>' Cc: NSU, ADW Well Integrity Engineer; Clingingsmith, Mike J(CH2M Hill) Subject: UNDER EVALUATION: E-37A (PTD #2050020) Sustained casing pressure All, ~ Well E-37A (PTD #2050020) has been found to have sustained casing pressure on the IA. The well broke MOASP on 08/13/09 with TIO pressures of SSV/2500/0 psi. Due to the GC1 turn-arountl, pressure cannot be bled to the system. A TIFL will be conducted when tanks are availabie. The weli has been reclassified as Under Evaluation and has been placed under the 28 day clock. The following action will be taken. 1. D: TIFL 2. S: Set DGLV in STA # 3& 4 3. F: MIT-IA to 3000 psi, LLR if fails A TIO plot and welibore schematic are attached. Please contact me with any questions. « Fi(e: E-37A TIO Plot.doc» « File: E-37A.pdf» '~ 9/16/2009 OPERABLE: E-37A (PTD #205~0) Sustained casing pressure mitigate~ Page 2 of 2 Thank you, Torin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 9/ 16/2009 PBU E-37A PTD# 2050020 8-16-2009 TIO Pressures a o00 ~ i I 3:000 2,000 t ,oon ~- Tbg -f - IA ~- DA OOA + OOOA -~- 0 n • 05;16I0~ 05/23l09 05130/09 Ofi106109 06f13/tl9 06I2UlUy os~z~ros o~r~aios or~77~oy 07I18IU9 l17l25i09 08;01ffja ORI0~109 ~= C~ WEI~HEAD = FMC ACTUATOR = BAKER KB. ELEV = BF. ELEV = 64,1' ~ 29 KOP = 10214' Max Angle = 98 @ 12405' Datum MD = 10465' Qatum ND = 8800' SS 10-3(4" CSG, 45.5#, NT-80, ID = 9.953" I EST TOP OF CEMENT ( ~ SAFETY : WE~BORE 70° @ 10633"`** 4-1/2 E~ V~ A CHROM E TBG`** Minimurn 1D = 3.725 a'{,~7 '10035' 4-112" HES XN NIPPLE 4-1/2" TBG, 12.6#, 13-CR VAM TOP, .0152 bpf, ID = 3.958" WHIPSTOCK (TAGGED 01/17/05) ~--~ 10214' ~EZSV (TAGGED 01/17/05} ~-1 10244' FISN- TAI~PIPE {GPB, 2-NIPPL.ES, & WLEG~ 10744 41/31/05 SIDETRACK 7-5(8° CSG, 29.7#, S-95, ID = 6.875" 10952~ PERFORATION SUMMARY REF LOG: NiWd ON ??? ANGLE AT TOP PERF: 76 @ 10785' Note: Refer to Production QB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7t8" 6 10785 - 10910 O 10/28106 2-1/2" 4 11340- 12340 O 01I27/05 2-7/8" 4 12710 - 13030 C 01 /27/05 ~ 4-1 /2" HES X NtP, ID = 3.813" ~ GAS LIFf MANDRELS ST MQ ND DEV 7Y1~ VLV LATCH PORT DATE 4 3380 3276 33 KBG DOME BK 16 7l26l06 3 6299 5626 37 KBG SO BK 20 7J26l06 2 8373 7278 37 KBG DMY SK 0 1(29/05 1 9899 8498 45 KBG DMY BK 0 1/29(05 ~J6$~ 4-1/2" HES X NIP, ID = 3.813" 9990' 7-5/8" X 4-1I2" BKR S-3 P4CR, ID = 3.850" 10014' -{4-1/2" HES X NIP, iD = 3.813" 10035' 4-1(2" HES XN NfP, ID = 3.725" 10040~ 7-5/8" X 5" BKR ZXP LTP w! HMC LNR HGR, ID = 4.400" 10048~ -'~4-112" WLEG, ID = 3.958" 10064~ 5" X 4-1/2" XO, ID = 3.950 MILL(7UT WINDOW (E-37A) 10214' - 10226' 12435" I-~~-~/2° CIBP(SEf 07/27/05) I I ~aT[~ 13044' 4-1/2" SdLIQ LPlR, 12.6#, ~-8d IBT-M, ~ .0152 bpf, ID = 3.958" dRTE REV BY COMMENTS DATE REV BY COMMENTS 08/04/95 OWGINAL COMPLEfION _,,,,,,,,,,,,,.,,,_ Q1(31/05 N7ES SIDETRACK "A" 07J26/05 RWLlPJC GLV C/O 07/27105 KEYJPJC SEf BKR CIBP @ 12435' 10128/06 SGS/PA ADI'FRFS 03/05/07 NNVS/PJC DRLG DRAFT CORRECTIONS PRURHOE BAY UNIT WEL~: E-37A PERMIT No: "~2050020 API No: 50-029-22571-61 SEC 6, T11 N, R14E, 3391' FS~ & 881' FEL BP Exploration (Alaska) Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Wwll .Inh !k t~. ~~-t~ Inn nncnr:nf:nn l3 ,`,~.t.~ ~,: ~~ = xn. ~~~lt~~. NO.5072 ~~~~~ Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 n~fe n~ rn~n. rn 02/09/09 W-210 40014842 OH MWD/LWD EDIT (REVISEb) 'J 02/26/07 2 1 W-36 11968735 RST - 03/07/08 1 C-30A AMJI-00009 MCNL - j ~ 12/04/08 1 1 W-01A AWJB-00020 MEMORY LDL ~~ - (~(o ~ `J~o 01/26/09 1 1 E-37A AXBD-00012 MEMORY PROD PROFILE g - 01/26/09 1 1 F-19 AP3O-00019 CORROSION EVALUATION I 07!01/09 1 1 ~ - i~ r s ~ rLtAJt AI:KNUWLtUIiE F{tl;tlr 1 tiY SItiNlNli ANU tiE 1 UHNINCi UNt GUPY EAGIi l U: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Servicq~ 2525 Gambell Street, Suite 4~ ~l Anchorage, AK 9950 -2838 ATTN: Beth I' ,{ Received by: "~..~.------•-'~~ . • -~~= ~. -~ MICROFILMED 03/01/2008 DO NOT PLACE _.~.~: ~ ~ ` ,~ . ~~.. ANY NEW MATERIAL UNDER THIS PAGE F:lLaserFicl~\C`vrPgs_Inserts\Microfilm Marker.~c 09/24/07 1 ~l Schlumberger ~ N0.4414 Alaska Data 8 Consulting Services t~4-1~~6/ ~U~ C ~~~~ Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503-2838 ~ Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay W®11 Jnh # Lnn DRSr_rinfinn Data RI Cnlnr Cn 09-25 11695072 LDL ~, ~ _p 08/17/07 L-04 11661166 SCMT - 08/25/07 1 15-268 11661165 MEM PROD PROFILE 08/23/07 1 02-12B 11628789 MEM PROD PROFILE p 08/20/07 1 02-11A 11428266 MCNL ~ ~ / t 10/03/06 1 1 18-24AL2 11209591 MCNL L- ~ `j (0 03/23/06 1 1 14-07 11637334 RST 1 - / C 05/08107 1 1 B-14 11637349 RST "~~- / ~/ 07/04/07 1 1 Z-08A 11630483 RST - C 06/21/07 1 1 Z-46 40012671 OH EDIT MWDILWD - ~ / 4i < 12/12/05 2 1 Z-46A 40012671 OH EDIT MWD/LWD ~ / - - 01/03/06 2 1 E-37A 10928640 MCNL ap5 _p~ -/ 06/14105 1 1 B-34 11594510 RST G~ _ ~ < ~- 06/14/07 1 1 MPH-17 11813063 CBUUSIT (PDC) CH EDIT X03 -(~ ~ 5' 07/21/07 1 r'LCNJG N1+r\nIVYYLCUt7t KCGCIF'1 CT 51t51V11Vt7 HIVU Kt1UKN11Vt7 VNt I:VYT tAtirl IU: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 -~ - "J E~ i, 11 900 E. Benson Blvd. ~ t .. "'~ Anchorage, Alaska 99508 w~- r~ ,, Date Delivered: ~~~° ~°"' ~, ~ I ~~ It~li i~i`~6~4~ i ._ . !€~ ~! +i --t Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-28 8 ATTN: Beth \ Received by: 8 `"- • )..8 ~~ DATA SUBMITTAL COMPLIANCE REPORT 1/30/2007 Permit to Drill 2050020 Well Name/No. PRUDHOE BAY UNIT E-37A Operator BP EXPLORATION (ALASKA) INC MD 13130 V' TVD 8940/ Completion Date 1/29/2005 Completion Status 1-01L REQUIRED INFORMATION Mud Log No Samples No ""-~-_...__."._~ _._"----~----- DATA INFORMATION Types Electric or Other Logs Run: MWD DIR / GR / RES / DEN / NEU / DDE, DEN / NEU, RES / GR Well Log Information: Logl Electr Data Digital Dataset Type Med/Frmt Number Name U'6 .- D Asc Directional Survey Rpt Directional Survey ~ D Asc Directional Survey Rpt Directional Survey I.~· Production tJ.og 14317 Induction/Resistivity ~ 14317 Induction/Resistivity i ~- C Lis 14317 I nd uction/Resistivity I /).og 14316 Induction/Resistivity ¿µ( 14316 Induction/Resistivity cß8./ C Lis 14316 Induction/Resistivity Well Cores/Samples Information: Interval Name Start Stop Log Log Run Scale Media No 2 Blu 25 Blu 25 Blu 25 Blu 25 Blu Sent Current Status 1-01L 5/GLd /9 Jrr-.. Å..-ð \) ,r- API No. 50-029-22571-01-00 UIC N --~--,~ --~'-----" Directional Survey Yes .--------....--."'.- - ~----~-'--'" ---------_..._~---- _.~-_._------_.._" (data taken from Logs Portion of Master Well Data Maint Interval OH/ Start Stop CH Received -- 10192 13130 Open 4/1/2005 10192 13130 Open 4/1/2005 10192 12844 Open 4/1/2005 10192 12844 Open 4/1/2005 11133 13001 Case 8/30/2005 10215 12844 Open 1/10/2007 10215 12844 Open 1/10/2007 10008 12848 Open 1/10/2007 10215 13081 Open 1/10/2007 10215 13081 Open 1/10/2007 10008 13135 Open 1/10/2007 Received Sample Set Number Comments . Comments PB 1 PB 1 PPROF, IPROF, & WARMBACKLOG MEMORY GR/CCUSTP PB1 TVD Vision Service FINAL 22-Jan-2005 PB1 MD Vision Service FINAL 22-Jan-2005 PB1 LIS Veri w/Graphics 29-Dec-2006 TVD Vision Service FINAL 23-Jan-2005 MD Vision Service FINAL 23-Jan-2005 LIS Veri w/Graphics 29- Dec-2006 . Permit to Drill 2050020 MD 13130 TVD 8940 ADDITIONAL INFORMATION y0 Chips Received? .~ ~. Well Cored? Analysis Received? Comments: ~- Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 1/30/2007 Well NamelNo. PRUDHOE BAY UNIT E-37A Operator BP EXPLORATION (ALASKA) INC Completion Date 1/29/2005 Completion Status 1-01L Current Status 1-01L Daily History Received? ~N dIN Formation Tops po Date: API No. 50-029-22571-01-00 UIC N _..____.______u ~_.._--------_._----- / II. (}!'I. z ~-~ 7----- . . Schlumbepger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Y-07 GNI-02A L-02A L-02A PB1 E-37 A E-37APB1 Job# 11076494 11536185 40010950 40010950 40011299 40011299 ., I ~/31 (.:, e()S-:-'OOd- "'/£/311 ?BI Log Description CH EDIT SDCL GR CH EDIT USIT (PDC-GR) OH EDIT MWD/LWD OH EDIT MWD/LWD OH EDIT MWD/LWD OH EDIT MWD/LWD PLEASE A~KNOWLEDGE RECEIPT BY SIGNING AND RETU~~I~~0I'~~~\~A!!~¡;) BP Exploration (Alaska) Inc. \;\,) '~''''''(;\_F '¡l,,'  Petrotechnical Data Center LR2-1 ";\~.i\"~._ 900 E. Benson Blvd, . \~ 'm\~ I Anchorage, Alaska 99508"- Date Delivered: Date 01112/06 12/08/06 12/15/04 12/25/04 01/23/05 01/22/05 NO. 4103 Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL Color CD 1 1 1 1 1 1 2 2 2 2 Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: 01/08/2007 .' . Scblumbepger Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Z-15 1'3;1·· (Jf.,? L5-17A lC/"Î ~ÀJ..3 DS 04-26 /3 ~-- JI\.{ S-14A '). \! "i - 011 G-27 I j'{¡¡- f r (¿, DS 05-20B ~ t'-¡ .. J..) 'I E-37A :l c ç - \ìt, 7...... D-29 I ~.r- :t.rJ L2-28 /t~' r - C J ~- C-13A i q 7 -/ t..i ~ OWDw-sw/t t-J, 3::¡ 06-08A ¡qr-I q r 12-29 J 3'1 - t¡3 '1- C-19B.ÃGt':;- O~ r G-27 j SI\¡-I n¡¡ F-02A ').. V ~- - c- vI <.( 03-33B ),O;Ç - ð/~ MPK·22 .ÄÚr:... ü.:l.2... BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# 11084273 11075898 11072873 10893047 10942221 10942220 10928640 11084274 11076453 11075900 10893096 11062628 11072867 10928632 10942221 10928630 10913011 10893106 ;1 Log Description PPROF W/DEFT/GHOST/CALlPER MEM PPROF W/DEFT/GHOST PRODUCTION PROFILE LEAK DETECTION LOG MEM PPROF & IPROF MEM INJECTION LOG MEM PPROF, IPROF & WARMBACK RST RST MCNL RST-BORAX CHANNEL DETECTION LOG RST RST MCNL MCNL MCNL US IT PDC-GR US IT Date 07/08/05 07/03/05 07/30/05 10/17/04 06/29/05 06/26/05 06/14/05 07/09/05 07/27/05 07/05/05 03/24/05 05/17/05 07/07/05 05/12/05 06/29/05 05/08/05 03/19/05 04/20/05 f~ :Zi~'\\ \ -..~ 08/30/05 NO. 3460 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CD . Color 1 1 1 1 1 1 1 1 1 1 i 31 .1 3 í.3 .,0 'f i y;.) r /];t.:J. (¡; 13':0.7 }.tJ.,J..8 131.;1,,:;/ n Á 3t:. 13;U; ,~;). 1.1... . Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage, AK 995,g3. .-.2138 .....".¡¡¡...'. . . A TTN Beth " ]/ (i /') /' Received by: ì{f(~~...U I E-37A (PTD #2050020) Classified as Problem Well All, Well E-37 A (PTD #2050020) has sustained casing pressure on the IA and is classified as a Problem well. TIO's on 06/24/05 were 2330/2320Nac. The well failed a TIFL on 6/24/05. The plan forward for this well is as follows: 1. DHD: TIFL- FAILED on BUR 2. SL: Run DGL V's in top 2 GLM's 3. DHD: Re-TIFL Attached is a wellbore schematic. Please call with any questions. «E-37 A.ZI P» Joe Anders, P.E. Well Integrity Coordinator, BP Exploration, (Alaska) Inc. Work: 1-907-659-5102 Mobile: 943-1154 Pager: 659-5100, x1154 Email: NSUADWWelllntegrityEngineer@bp.com Content-Description: E-37A.ZIP Content-Type: applicationlx-zip-compressed Content-Encoding: base64 i-o 1\ ~"\p\{-Á1-¡¡~ PreS51A/€. [p;,\) J...A. Z3ZG 5\?,o ~ .LLv'1 P ~<ò A<l ¡\,;IT'-( P (~~~) ()A v'k.. ScY ~ +ç~ .~tR(~. 0 r- 'e(' CD 4q 2.- ~:? t -J ~~1t{ ? f \~ I bÇ I of 1 7/13/20059:47 AM TREE'" 41/16" 5M WELLHEAD = FMC Gen- 5 ACTUA TOR = ~~ ~~~ >~ KB. ELEV = 28.05' BF. ELEV = ~~~.n n~_ m^'~.. >~< . ~~ ~< KOP= 10,215'MD 'n~M ._~m" 'H~~"'~.,~~,. .~_< '_~__M'''''~ . ," IVIax Angle = 98 Deg @12,405' ...M .__,__.__ Datum MD = 13.130' -"~ -.« Datum TVD = 8.939' . E-37A FROM DRlG - DRAFT _M_~_." ~ 110-3/4" CSG, 45.5#, NT-80, ID = 9.953"1-1 I~ -1ST - 4 L ~ - 1 3798' Calculated TOC Values Gauge hole = - 5,825' 50% Washout = -7,834' Top of 4-1/2" LNR -10,039' Top of Whipstock -10,215' Tail Pipe left in the hole consisting of the following: 7-5/8" x 4-1/2" BKR SABL-3 PKR, 10=3.875" 4-1/2" HES CIBP 4-1/2" HES X Nip, 10=3.813" 4-1/2" HES XN Nip, 10=3.725" 4-1/2" WLEG TOP51/2"LNRH 10817' r 7-5/8" CSG, 29.7#, S-95, ID = 6.875"-1 10952' o . 4-1/2" 12.6#, 13Cr TBG, ID = 3.958' HES 4-1/2" X Nipple 10 = 3.813" @ 2,228' MD 3380 6298 8372 9899 GAS LIFT MANDRELS DEV TYÆ VLV LATCH KBG 2 DOME BK KBG 2 SO BK KBG 2 DMY BK KBG 2 DMY BK DATE 2/10/05 2/1 0/05 1/29/05 1/29/05 PORT 16 20 o o TVD 3275 5525 7277 8498 HES 4-112" X Nipple 10 = 3.813" @ 9,967' BKR 7-518" x 4-112" S-3 PKR @ 9,989' HES 4-1/2" X Nipple 10 = 3.813" @ 10,014' HES 4-1/2" XN Nipple 10 = 3.725" @ 10,034' 4-1/2" WLEG @ 10,047' PBTD -13,038' 4-1/2" Solid LNR, 12.6#, L-80 -13,129' 11600' H 3 3/8" BKR ISP I I-{ 3 3/8" BKR IBP I 12379' 1-1 BKR IBP I PBTD -1 12379' ÆRFORA TION SUMMARY ANGLE AT TOP ÆRF: -93 @ 11340' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 2 1/2" 4 11340'-12340' 0 01/27/05 27/8" 4 12710'-13030' 0 01/27105 COMMENTS 151/2" LNR, 17#. L-80, .0232 bpf, ID = 4.892"1-f 12512' I DATE 08/04/95 08/10/01 09/05/02 07/12/03 09/17/03 03/03/04 REV BY DATE 03/17104 11/08/04 01/29/05 02/10/05 REV BY COMl\4ENTS ANY ITLP Perf Corrections KWA Pre-rig work for Sidetrack WRD Actual Completion after Sidetrack RMHlPJC GL V ClO Original Horizonatal Completion RNIRP Corrections CWS/tlh Add Perfs CMOIll..P KB EJevation Correction RMHlTLP Perf Angle Correction TJS GLV ClO PRUDHOE BA Y UNrr WELL: E-37A ÆRMrr No: XXX-XXXX API No: 50-029-22571-01 SEC 6, T11N, R14E 3391' FSL & 881' FEL BP Exploration (Alaska) FW: E-37A (PTD#2050020) Classified as Problem Well I had received a note that this e-mail may not have made it through and been delivered. Here it is again. Please let us know if you have any questions. Thanks, Anna From: NSU, ADW Well Integrity Engineer Sent: Saturday, Aprill6, 2005 2:30 PM To: Wellman, Taylor T.; GPB, GCl Area Mgr; Rossberg, R Steven; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; 'AOGCC Jim Regg (E-mail)'; 'AOGCC Winton Aubert (E-mail)'; NSU, ADW WL & Completion Supervisor; GPB, GCl Well pad Lead Cc: NSU, ADW Well Integrity Engineer; Reeves, Donald F Subject: E-37A (PTD #2050020) Classified as Problem Well All, Well E-37 A (PTD #2050020) has been found to have sustained casing pressure on the IA. The TIO's on 4/6/05 were 500/2100/0 when the IA pressure was bled. The IA pressures initially appeared stable. A subsequent TIFL was conducted on 04/13/05 and failed on IA re-pressurization. The plan forward for this well is as follows: 1. DHD: TIFL - FAILED 2. SL: GL V c/o 3. DHD: Re-TIFL «E-37 A.ZI P» A well bore schematic has been included for reference. The well has been classified as a Problem well. Please call if you have any questions. Thank you, }lnna (})u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 Content-Description: E-3? A. ZIP Content-Type: application/x -zip-compressed Content-Encoding: base64 1 of 1 5/10/20058:42 AM TREE = 41/16" 5M WELLHEAD = FMC Gen- 5 ACTUATOR = KB. ELEV =28.05' 'nM'" . on. ~ , BF. ELEV = ..."n. CC KOP= 10,215' MD . M~ __n ~_~"c ....... c, .." Max Angle = 98 Deg @12,405' Datum MD = 13,130' A'· " _ Datum TVD '" 8,939' . E-37A FROM DRlG - DRAFT 110-3/4" CSG, 45.5#, NT-80, ID = 9.953"H I~ ~ST L ,; 3798' Calculated TOC Values Gauge hole = - 5,825' 50% Washout = - 7,834' Top of 4-1/2" LNR -10,039' Top of Whipstock -10,215' Tail Pipe left in the hole consisting of the following: 7-5/8" x 4-112" BKR SABL-3 PKR, ID=3.875" 4-112" HES CIBP 4-1/2" HES X Nip, ID=3.813" 4-1/2" HES XN Nip, ID=3.725" 4-1/2" WLEG TOP51/2"LNRH 10817' 7-5/8" CSG, 29.7#, 5-95, ID = 6.875"-/ 10952' . 4-112" 12.6#, 13Cr TBG, ID = 3.958' HES 4-1/2" X Nipple ID = 3.813" @ 2,228' MD 3380 6298 8372 9899 GAS LIFT MANDRELS DEV TYÆ VLV LATCH KBG 2 DOME BK KBG 2 SO BK KBG 2 DMY BK KBG 2 DMY BK DATE 2/10105 2/1 0105 1/29/05 1/29/05 PORT 16 20 o o TVD 3275 5525 7277 8498 HES 4-1/2" X Nipple ID = 3.813" @ 9,967' BKR 7-5/8" x 4-1/2" S-3 PKR @ 9,989' HES 4-1/2" X Nipple ID = 3.813" @ 10,014' HES 4-1/2" XN Nipple ID = 3.725" @ 10,034' 4-1/2" WLEG @ 10,047' PBTD -13,038' 4-1/2" Solid LNR, 12.6#, L-80 -13,129' 11600' 1-/ 3 3/8" BKR IBP 11920' - 3 3/8" BKR IBP I 12379' H BKR IBP I PBTD - 12379' ÆRFORA TION SUMMARY ANGLE AT TOP ÆRF: -93 @ 11340' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DA TE 21/2" 4 11340'-12340' 0 01/27/05 2 7/8" 4 12710'-13030' 0 01/27/05 151/2" LNR, 17#, L-80, .0232 bpf, ID=4.892"H 12512' I DATE 08/04/95 08/10/01 09/05/02 07/12/03 09/17/03 03/03/04 REV BY COMMENTS DATE Original Horizonatal Completion 03/17/04 RNlRP Corrections 11/08/04 CWS/tlh Add Perfs 01/29/05 CMOITLP KB Bevation Correction 02/10105 RMHlTLP Perf Angle Correction TJS GLV C/O REV BY COMMENTS ANY ITLP Perf Corrections 'r0NA Pre-rig work for Sidetrack WRD Actual Completion after Sidetrack RMHlPJC GL V C/O PRUDHOE BA Y UNfT WELL: E-37A ÆRMfT No: XXX-XXXX A PI No: 50-029-22571-01 SEe 6, T11N, R14E 3391' FSL & 881' FEL BP Exploration (Alaska) . . Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman Well No E-37 A Date Dispatched: ll-Mar-05 Installation/Rig Nabors 7ES Dispatched By: 0 Data No Of Prints No of Floppies Surveys 2 Received By: ~Q (J1J-J Please sign and return to: Drilling & Measurements LWD Division 3940 Arctic Blvd, Suite 300 Anchorage, Alaska 99503 nrose1@slb.com Fax: 907-561-8417 LWD Log Delivery V 1.1 , 10-02-03 Schlumberger Private )JJ b -\S ~ )- . . Schlumberger Drilling & Measurements MWD/lWD log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman Well No E-37APB1 Date Dispatched: 11-Mar-05 Installation/Rig Nabors 7ES Dispatched By: 0 Data No Of Prints No of Floppies Surveys 2 Received By: ~ ()/1J Please sign and return to: Drilling & Measurements LWD Division 3940 Arctic Blvd, Suite 300 Anchorage, Alaska 99503 nrosel@slb.com Fax: 907-561-8417 LWD Log Delivery V1.1, 10-02-03 Schlumberger Private :ÅÒ )-(:) Ú Ä .. STATE OF ALASKA _ ALAS~L AND GAS CONSERVATION COM'~ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG No. of Completions 1 a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 o GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3391' NSL, 881' WEL, SEC. 06, T11 N, R14E, UM Top of Productive Horizon: 287' NSL, 4798' WEL, SEC. 06, T11 N, R14E, UM Total Depth: 481' NSL, 2369' WEL, SEC. 01, T11 N, R13E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x-~~410~ y- 5975167 _ Zone-_ASP~ TPI: x- 660297 y- 5972032 Zone- ASP4 Total Depth: x- 657793 y- 5972121 Zone- ASP4 -----~~--------- 18. Directional Survey 181 Yes 0 No --~~------- 21. Logs Run: MWD DIR I GR I RES I DEN I NEU I DDS, One Other 5. Date Camp., Susp., or Aband. 1/29/2005 6. Date Spudded 1/19/2005 7. Date T.D. Reached 1/23/2005 8. KB Elevation (ft): 57.05' 9. Plug Back Depth (MD+ TVD) 13044 + 8939 10. Total Depth (MD+TVD) 13130 + 8940 11. Depth where SSSV set (Nipple) 2229' MD 19. Water depth, if offshore NI A MSL CASING SIZE. 20" 10-3/4" 7-518" 4-1/2" DEN I NEU, RES I GR CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HÓLE lOP BoTTOM 0, OP BoTTOM SIZe Surface 105' Surface 105' 30" 35' 3798' 35' 3617' 13-1/2" 32' 10215' 32' 8703' 9-7/8" 10040' 13129' 8593' 8940' 6-1/8" 22. Wr. PeR FT. 91.5# 45.5# 29.7# 12.6# GRADE H-40 NT80 L-80 L-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 2-1/2" Gun Diameter, 4spf 2-7/8" Gun Diameter, 4spf MD TVD MD TVD 11340' - 12340' 8993' - 8963' 12710' - 13030' 8944' - 8939' 26. Date First Production: February 14, 2005 Date of Test Hours Tested PRODUCTION FOR 2/15/2005 8 TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 1,020 1,825 24-HoUR RATE 24. SIZE 4-112", 12.6#, 13Cr80 25. DEPTH INTERVAL (MD) 2200' RECEIVED MAR 0 4 2005 1 bA,~~à Ç"~: . . 181 Deveropmq~~S~¡{;~sion o StratigraplAPCJöqøvice 12. Permit to Drill Number 205-002 13. API Number 50- 029-22571-01-00 14. Well Name and Number: PBU E-37 A 15. Field I Pool(s): Prudhoe Bay Field I Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 028280 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) AMOUNT PULLED 260 sx Arctic Set (Approx.) 1242 sx CS "'. 371 sx 'G'. 327 sx CS II 682 sx Class 'G' 384 sx Class 'G' DEPTH SET (MD) 1 0048' PACKER SET (MD) 9990' AMOUNT & KIND OF MATERIAL USED Freeze Protect with 91 Bbls of Diesel PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Flowing OIL-BBL 698 GAs-McF 13,999 GAs-McF 41,996 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". f'~' ',"';'~" None I~'~~::' !' ..~~.- .,. .J}2"'."'" .,.,.,,.,. " r~fd":i'i.J ¡. . .- ! "'-'" Form 1 0-407 Revised 12/2003 OIL -BBL 2,095 27. W ATER-BBL 9 WATER-BBL 26 DUPLICATE CONTINUED ON ReVERSE SIDE CHOKE SIZE I GAS-OIL RATIO 960 20,042 OIL GRAVITY-API (CORR) 27.2 RBDMS BFl MAR 0 8 2005 GF 28. GEOLOGIC MARKER. 29. .ORMATION TESTS Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". NAME MD TVD Base CGL 10217' 8704' None 23SB I Zone 28 10305' 8759' 22TS 10374' 8803' 21TS I Zone 2A 10472' 8861' Zone 1 B 10592' 8919' TDF I Zone 1A 10734' 8963' Base Sadlerochit 10916' 9002' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~M.Ì.R ~ Title Technical Assistant Date 03 -œ -os PBU E-37 A 205-002 Prepared By NameINumber: Terrie Hubb/e, 564-4628 Well Number Drilling Engineer: Ken Allen, 564-4366 Permit No. I Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 1 0-407 Revised 12/2003 Submit Original Only Legal Name: E-37 Common Name: E-37 1/19/2005 FIT 10,215.0 (ft) 8,703.0 (ft) 8.40 (ppg) 635 (psi) 4,433 (psi) 9.80 (ppg) . . Printed: 1/31/2005 8:01:42 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-37 E-37 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 1/8/2005 1/29/2005 Spud Date: 6/26/1995 End: 1/29/2005 1/7/2005 21 :30 - 00:00 2.50 MOB P PRE Prepare rig for move off of D-06A and subsequent move to E -37 A. 1/8/2005 00:00 - 14:00 14.00 MOB P PRE Rig down and prepare rig and support complexes for move to E-37. Move camp, pits and shop complex to E-37. Weather conditions deteriorating as wind speeds begin to gust to 20 MPH with blowing snow. Discussed current and forecasted weather conditions with Toolpusher. For the safety of the rig crews and those supporting the rig move the decision was made to WOW. Perform personnel count of crew members still with sub on D-06. and instuct not to go outside. Escort pickup from satelite camp to mudpits with forklift and move workers from pits into camp. Fuel camp with portable fuel tank and prepare for blow. Three Veco workers caught in weather took shelter in camp. They called their supervisors and parked their equipment near camp.( Phase 1 conditions had been announced at 1 :00 P.M. Phase 2 conditions were announced at 2:05 and Phase 3 conditons 2 1/2 hours later at 4:30.) 14:00 - 00:00 10.00 MOB N WAIT PRE Blowing snow and visibility causing field wide, "Phase 3", on all roads and pads. 1/9/2005 00:00 - 00:00 24.00 MOB N WAIT PRE Wait for Phase 3 weather conditions so rig move can continue. The shop, camp pt complexes are currently on E-pad. The substructure is still on D-Pad. 1/1 0/2005 00:00 - 00:00 24.00 MOB N WAIT PRE WOW Phase 3 on all roads and Pads. Change crews out with heavy equipment escort along with 3 Veco hands and MI mudman. Fuel substructure, camp and pits. Haul grey water and bring 1 load of potable water to camp. 1/11/2005 00:00 - 00:00 24.00 MOB N WAIT PRE WOW Phase 2 on all roads and phase 3 on Pads. Change crews out with heavy equipment escort along with 3 Veco hands. Fuel substructure, camp and pits. Haul grey water and bring 1 load of potable water to camp. 1/12/2005 00:00 - 13:45 13.75 MOB N WAIT PRE WOW Phase 2 on all roads and phase 3 on Pads. Change crews out with heavy equipment escort Fuel substructure, camp and pits. Plow snow on E pad. 13:45 - 18:15 4.50 MOB P PRE PJSM w/security. Move sub from D Pad to E pad, 18:15 - 20:15 2.00 RIGU P PRE Set mats, lay Herculite over well head, spot sub over well, plow snow, maneuvered pits into minimal space. 20: 15 - 00:00 3.75 RIGU N MISC PRE Shovel snow from rig floor and pits 1/13/2005 00:00 - 07:30 7.50 MOB P PRE PJSM, set sub, pits, camp, shop, hook up all service lines. PJSM note proximity of well next w/2500 psi on annulus. All hands instructed to take note and avoid. 07:30 - 08:30 1.00 MOB P PRE PJSM derrick raise. Raise derrick and cattle chute. 08:30 - 10:00 1.50 MOB P PRE PJSM bridle down and store. Reconnect top drive. Accept rig @10:00 10:00 - 15:00 5.00 BOPSUP P DECOMP Make up stand pipe, blower, kelly hose, cement line. Complete pre-spud checklist. 15:00 - 17:30 2.50 BOPSUR P DECaMP Rig up lubricator and pull BPV, had difficulty pulling BPV past master valve. Heated tree with steam line. 17:30 - 18:30 1.00 BOPSUF P DECaMP Rig up lines to circulate. Test lines to 3500 psi. 18:30 - 19:00 0.50 BOPSUP P DECaMP Reverse circulate heated seawater 56 bbls at 5 bbls/min with 520 psi. Blow down lines 19:00 - 20:30 1.50 BOPSUP P DECOMP Circulate down tubing 410 bbl at 6 bbl./min with 550 psi. 20:30-21:15 0.75 BOPSUF P DECaMP Monitor well. Static. Blow down lines, install TWC and test to Printed: 1/31/2005 8:01 :48 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-37 E-37 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 1/8/2005 1/29/2005 Spud Date: 6/26/1995 End: 1/29/2005 1/13/2005 20:30-21:15 0.75 BOPSUP P DECOMP 1000 psi. 21:15 - 23:00 1.75 BOPSUF P DECOMP Nipple down tree. Remove from cellar. Verified 4.5" NSCT tubing hanger threads ok with crossover. 23:00 - 00:00 1.00 BOPSUP P DECOMP Nipple up BOP. 1/14/2005 00:00 - 02:00 2.00 BOPSUF P DECOMP Nipple up BOP. 02:00 - 08:30 6.50 BOPSUP P DECOMP Test BOPE with AOGCC witness present. 08:30 - 09:00 0.50 BOPSUF P DECOMP RID test equipment. 09:00 - 10:00 1.00 PULL P DECOMP Pull two way check valve. 10:00 - 11 :30 1.50 PULL P DECOMP RlU and test 7-5/8" casing to 3500 hold on chart for 30 minutes. 11 :30 - 12:00 0.50 PULL P DECOMP PJSM with Schlumberger on wireline work. R/U wireline unit. 12:00 - 15:00 3.00 PULL P DECOMP RIH with string shot and fire at 9750'. 15:00 - 16:00 1.00 PULL P DECOMP POH with wireline and hold and PJSM with Schlumberger, Co. Rep., and crew. UD string shot tools. 16:00 - 17:00 1.00 PULL N HMAN DECOMP Attempt to M/U chemical cutter. Schlumberger attempted to hand hold chemical cutting tool in mousehole and dropped chemical cutter into cellar. Shut down operation for safety meeting and procedural analysis. 17:00 - 19:30 2.50 PULL P DECOMP M/U and RIH with chemical cutter on wireline to 9750' and fire. 19:30 - 20:15 0.75 PULL P DECOMP POOH with electric line and stack sheaves on rig floor for possible second run. 20:15 - 21 :30 1.25 PULL P DECOMP M/U x-over to tubing hanger. Estimated string wt. 137K. Unseat hange and pull string up to 165K and hold. Hanger free and moving, tubing not free at cut. Slack off on tubing and pull to 165K again. Tubing pulled free. Up wt. 145K. 21:30 - 22:15 0.75 PULL P DECOMP Circulate bottoms up 10 bpm. 630 psi. Pump dry job. 22:15 - 23:00 0.75 PULL P DECOMP Lay down tubing hanger, 1 jt. DP, XO. Blow down top drive. Rig up Cameo control line spooler. 23:00 - 00:00 1.00 PULL P DECOMP UD 4.5" tubing, spool control lines. Dropped band cutting chisel in hole. 3/8" OD x 6" length. Rubber skirt in place around pipe and over hole, went through crack. Discuss process and revamp chisel wrench to prevent recurrence. 1/15/2005 00:00 - 10:30 10.50 PULL P DECOMP POOH and lay down 4.5" tubing. 57 of 57 bands recovered. 10:30 - 12:00 1.50 BOPSUP P DECOMP PJSM, RlU to test lower pipe rams. 12:00 - 14:15 2.25 BOPSUP P DECOMP Test lower pipe rams, 250 psi low, 3500 high, install wear bushing, RID, blow down topdrive. 14:15 - 15:45 1.50 FISH P DECOMP PU overshot assy. , jars, bumper sub, and 9 drill collars 4.75" OD 15:45 - 00:00 8.25 FISH P DECOMP PU 1 thru 297 jts. of drill pipe. 1/16/2005 00:00 - 01 :00 1.00 FISH P DECOMP RIH to 9700. Check up wt. 175, dn. wt. 155, rot. wt. 165, torque free 4K ft. Ibs. circulating at 5 bbl/min. 320 psi. RIH, tag 4 1/2" tubing stub with joint 296 box at floor at 9735' driller's tally. Swallow stub, engage fish. Pick up 225K, circulate at minimum rate. Trip jars. Rotate w/15k over string wt. Torque same as free torque 4K. K-Anchor pulled free after 12 rounds to right. 01 :00 - 01 :45 0.75 FISH P DECOMP PU off bottom. Circulate bottoms up. 01 :45 - 05:00 3.25 FISH P DECOMP Monitor well. Pump dry job. POH w/fish. 05:00 - 06:00 1.00 FISH N DECOMP Repair hydraulic hose on top drive. 06:00 - 09:00 3.00 FISH P DECOMP RU tubing handling equipment to lay down fish. LD 49.86' of fish including tubing stub, pups, X-nipple, K-Anchor 09:00 - 09:30 0.50 PULL P DECOMP Lubricate rig and topdrive. Printed: 1/31/2005 8:01 :48 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-37 E-37 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 1/8/2005 1/29/2005 Spud Date: 6/26/1995 End: 1/29/2005 1/16/2005 09:30 - 10:30 1.00 CLEAN P DECOMP MU packer milling BHA. 10:30 - 12:00 1.50 CLEAN P DECOMP PU and RIH w/4" drillpipe from pipeshed. 12:00 - 19:00 7.00 CLEAN P DECOMP RIH. Tag packer at 9782. Up wt. 180K, dn. wt. 160K, Rot. wt. 175K, Rot. free torque 4K. 19:00 - 21 :00 2.00 CLEAN P DECOMP Mill packer, 100 rpm, 6200 torque, 5 bblsJmin., 550 psi. 21 :00 - 21 :30 0.50 CLEAN P DECOMP Rubber milled up on packer, lost returns. Continue milling. 21:30-22:15 0.75 CLEAN P DECOMP Packer fell. TIH to 10,744. Tag up on packer. 22:15 - 22:45 0.50 CLEAN N DECOMP Circ. @ 3.5 bpm, lose 3.5 bpm. Build LCM pill. 22:45 - 23:30 0.75 LCR N DECOMP Pump 30#/bbl. hi vis LCM pill @ 5 bpm, 925 psi. 23:30 - 00:00 0.50 LCR N DECOMP Pull 1 std., blow down top drive and monitor well. Static. Total fluid loss = 650 bbls. 1/17/2005 00:00 - 01 :00 1.00 LCR N DECOMP Pull 1 std and flowcheck well. 01 :00 - 01 :30 0.50 CLEAN P DECOMP Pull 7 stds DP overflowing. 01 :30 - 02:00 0.50 CLEAN P DECOMP Pump dry job. 02:00 - 02:15 0.25 CLEAN P DECOMP Pull 3 stands. Well flowing, making gas. 02:15 - 04:00 1.75 CLEAN N DECOMP RIH to 10664. Circulate bottoms up. See the LCM. Pump until clean. SID. Monitor well. Static. 04:00 - 08:30 4.50 CLEAN P DECOMP Pump dry job and POH. 08:30 - 14:30 6.00 DHB P DECOMP PJSM and IR/U wireline and RIH with 6.75" gauge ring and junk basket. Nothing recovered. 14:30 - 20:00 5.50 DHB P DECOMP PJSM with E-line rep, co. rep., & crew. PIU EZSV bridge plug. Trip in hole and set at 10,233. POOH. RID Schlumberger. 20:00 - 22:00 2.00 STWHIP P WEXIT P/U Whipstock, milling assy. & MWD, perform shallow pulse test, & orient whipstock. 22:00 - 00:00 2.00 STWHIP P WEXIT RIH with Whipstock assy. 1/18/2005 00:00 - 05:00 5.00 STWHIP P WEXIT PJSM. RIH with Whipstock to 50' above EZSV bridge at 10233'. Orient tool 79 deg right of high side. Slack off, set Trip Ý Anchor. Shear pin with 35K over pull. Top of window depth 10,215'. 05:00 - 07:30 2.50 STWHIP P WEXIT Diplace seawater with 8.4 ppg milling fluid. 07:30 - 08:15 0.75 STWHIP P WEXIT Test 7 5/8" casing for 30 minutes with EZ Drill bridge plug at 10,233'. 08:15 - 19:45 11.50 STWHIP P WEXIT Milling 63/4" window from 10,215' to 10,227'. 340 GPM, 1720 psi, 115 RPM, 5-30K WOB, 4400-6000 TO. ROP gradually slowed to 70 min/ft. The 6 1/8" starter mill in open hole and lower 6 5/16" string mill out of the bottom of the window. Total 12' of window cut and 4.5' of open hole. Pumped around 35 bbl super sweep pill. No significant amount of metal or cutting returned. 19:45 - 20:30 0.75 STWHIP P WEXIT Get SPR's, POOH f/10,233' 5 stds tl9783'. 20:30 - 23:00 2.50 STWHIP P WEXIT PJSM wfTP & crew, change out 1500' drilling line. 23:00 - 00:00 1.00 STWHIP P WEXIT Pump dry job, blow down top drive, con't POOH f/9783' tl9200'. 1/19/2005 00:00 - 03:45 3.75 STWHIP P WEXIT Continue to POOH from 9046' to starter mill. (NOTE: Starter mill 1/2" under-gauge, lower & upper string mills in-gauge (6.25" gauge ring no-go on lower string mill), decision made to PU drilling BHA #4.) 03:45 - 07:30 3.75 STWHIP P WEXIT Lay down BHA #3 (milling assembly). 07:30 - 08:00 0.50 DRILL P PROD1 Rig service - lubricate rig / top drive. 08:00 - 08:45 0.75 DRILL P PROD1 Wash out BOP. 08:45 - 10:45 2.00 DRILL P PROD1 Pick-up BHA #4 . test & calibrate MWD. 10:45 - 13:00 2.25 DRILL P PROD1 RIH with 4" drillpipe to 5172'. 13:00 - 18:00 5.00 DRILL N SFAL PROD1 Floor hand hit by falling ice from derrick, stop operations, clear remaining ice & snow from derrick before resuming operations. Printed: 1/31/2005 8:01 :48 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-37 E-37 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 1/8/2005 1/29/2005 Spud Date: 6/26/1995 End: 1/29/2005 1/19/2005 18:00 - 20:15 2.25 DRILL P PROD1 Continue to RIH from 5172' to 10,050'. 20:15 - 21:00 0.75 DRILL P PROD1 MAD pass in hole from 10,050' to 10,205', 800' fph, 240 gpm. 21 :00 - 21 :15 0.25 DRILL P PROD1 RIH through window to 10,230' (no pumps) - no problems, 175k up, 150k down, establish slow pump rates. 21:15 - 23:00 1.75 DRILL P PROD1 Directionally drill (slide mode) from 10,233' to 10,241', 240 gpm, 1110 psi (20' new hole from mid-window at 10,221 '. 23:00 - 00:00 1.00 DRILL P PROD1 Pull up through window, blow down top drive, RU & FIT formation to 9.8 ppg - OK (635 psi initial shut in bled down to 580 psi during 10 minute test). ADT = 1 hr AST = 1 hr 1/20/2005 00:00 - 12:45 12.75 DRILL P PROD1 Drilling ahead from 10241' to 10715', 40 rpm, 4.7k tq, 295 gpm, 1650 psi, 190k up, 150k dn, 165 rot. AST = 6.83 hrs / ART = 1.12 hrs 12:45 - 14:30 1.75 DRILL P PROD1 Circulate bottoms up prior to trip out of hole for BHA #5. 14:30 - 20:00 5.50 DRILL P PROD1 Pump dry job, drop rabbit, POOH to top BHA #4. 20:00 - 21 :00 1.00 DRILL P PROD1 Lay down BHA #4. 21 :00 - 22:00 1.00 DRILL P PROD1 Pick-up BHA #5. 22:00 - 22:30 0.50 DRILL P PROD1 PJSM - load MWD sources. 22:30 - 00:00 1.50 DRILL P PROD1 Trip in hole w/BHA #5 to 3100', shallow hole test MWD. 1/21/2005 00:00 - 03:30 3.50 DRILL P PROD1 Continue to run in the hole from 3100' to 10,715' (no problems running through window / wash down last stand - no fill). 03:30 - 14:00 10.50 DRILL P PROD1 Drill ahead from 10,715' to 11,122'. 10k-20k wob, 300 gpm, 1750/1530 psi pumps on/off, 5-6k tq on, 3k tq off, 195k up, 150k dn, 165k rt wt, 80 rpm. Slide and rotate to maintain angle and direction. Pumped around weighted sweep, no increase in cuttings noted. 14:00 - 14:15 0.25 DRILL P PROD1 Rig service (lubricate rig/top drive). 14:15 - 00:00 9.75 DRILL P PROD1 Drill from 11,122' to 11,568',1 Ok-20k wob, 300 gpm, 1950/1750 psi pumps on/off, 5-6k tq on, 4-5k tq off, 180k up, 140k dn, 165k rt wt, 80 rpm. Slide and rotate to maintain angle and direction. ART = 1.68 hrs AST = 13.45 hrs ADT = 15.13 hrs 1/22/2005 00:00 - 14:15 14.25 DRILL P PROD1 Drill ahead from 11,568' to 12,652', maintain mud weight <8.6 ppg, running +/-60 bbls water/hr, 297 gpm, 2000 psi on, 1800 psi off, 6-7k tq on, 4-5k tq off, 195k up, 140k dn, 165k rt, 80 rpm, 10-20k wob. Slide and rotate to maintain angle and direction. 14:15 - 14:45 0.50 DRILL P PROD1 Circulate hole per geologist. 14:45 - 16:30 1.75 DRILL P PROD1 Drill ahead from 12,652' to 12,843' (8892' TVD), 296 gpm, 2000 psi on, 1750 psi off, 6-7k tq on, 4-5 k tq off, 195k up, 140k dn, 165k rt, 80 rpm, 10-20k wob. Slide and rotate to maintin angle and direction. 16:30 - 17:45 1.25 STKOH C PROD1 Circulate hole per geologist. Decision made to pull back up hole for low-side sidetrack at @ 12,450' after realizing well bore had exited target interval. 17:45 - 18:30 0.75 STKOH C PROD1 POOH to 12,365' for open-hole sidetrack, tight at 12,652', back-reamed from 12,652' to 12,450'. Printed: 1/31/2005 8:01 :48 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-37 E-37 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 1 /8/2005 1/29/2005 Spud Date: 6/26/1995 End: 1/29/2005 1/22/2005 18:30 - 20:45 2.25 STKOH C PROD1 Begin open-hole sidetrack, orient and ~tart trenching for low-side departure from 12,400' to 12,450'. 20:45 - 00:00 3.25 STKOH C PROD1 Time drilling from 12,450' to 12,460' for sidetrack, lost ledge at @ 12,457', pulled back to 12,453' to time drill. ADT = 9.92 hrs / ART = 4.35 hrs / ART = 5.57 hrs 1/23/2005 00:00 - 10:00 10.00 STKOH C PROD1 Time drill from 12,453' to 12,477' to re-establish open-hole sidetrack, ADT 2.47 hrs, AST 2,47 hrs. 10:00 - 16:30 6.50 STKOH C PROD1 Drilled from 12,477' to 12,843' in sidetracked hole, 2.25, 195k up, 145k dn, 160k rot, 300 gpm, 80 rpm, 10k wob, 2200 psi on, 2000 psi off, 7-8k tq on, 5-6k tq off. 16:30 - 20:00 3.50 DRILL P PROD1 Drilled sidetrack hole from 12,843' to the final well TD at 13,130' (8941' TVD) in sidetracked hole, ADT 3.95, AST 1.7, ART 2.25, 195k up, 145k dn, 160k rot, 300 gpm, 80 rpm, 10k wob, 2200 psi on, 2000 psi off, 7-8k tq on, 5-6k tq off. 20:00 - 21 :30 1.50 DRILL P PROD1 Circulate 1.25 x bottoms up at 300 gpm, 100 rpm, working full 90' stand. 21 :30 - 00:00 2.50 DRILL P PROD1 Monitor well- OK (some seepage), POOH from 13,130' to 11,791' to begin short trip to window (will MAD pass from 10,835' to window), back ream out at 300 gpm, 100 rpm, 20 ftlmin to clean-up hole for the liner. 1/24/2005 00:00 - 03:00 3.00 DRILL P PROD1 Continue to POOH for wiper trip/MAD pass from 11,791' to 10,200'. From 11,791' to 10,835', backream out of hole at 20'/minute, 300 gpm, 100 rpm. From 10,835' to 10,230', MAD pass out of hole at 8'/minute, 300 gpm, 60 rpm. Pulled bit into casing above Whipstock to service top drive - no problems pulling through window. 03:00 - 03:30 0.50 DRILL P PROD1 Service top drive. 03:30 - 05:30 2.00 DRILL P PROD1 RIH afer short trip to window (no problems going back through window). Held up at 12,843'. Survey indicates bit is in the original hole. 05:30 - 06:00 0.50 DRILL N DPRB PROD1 POH to sidetrack depth at 12,450' to work on sidetrack entrance to new hole, orient bit and work through entrance to sidetracked hole - OK. 06:00 - 07:15 1.25 DRILL P PROD1 RIH to 13,130' with out problems. 07:15 - 10:00 2.75 DRILL P PROD1 Circulate BU, pump weighted sweep surface to surface (2 ppg over), 300 gpm, 1850 psi, 100 rpm, 165k rt wt, 180k up wt, 150k dn wt, torque 5000k. 10:00 - 18:00 8.00 DRILL P PROD1 POOH for liner, spotted liner running pill in open hole by pumping 3.48 bbls while pulling each stand out of the open hole (conditioned Flo-Pro w/Lubetex), pulled through window and pumped dry job, POOH to BHA. 18:00 - 19:30 1.50 DRILL P PROD1 PJSM on removing MWD "source", lay down BHA. 19:30 - 00:00 4.50 CASE P PROD1 Clean and clear floor, PJSM for liner running, 30 joints run. 1/25/2005 00:00 - 02:30 2.50 CASE P RUNPRD RIH with 4 1/2" liner from joint #30 to joint #74 (12.6# L-80 IBT-M), torque to "position", circulated through liner on 1 stand drillpipe - OK, make up hanger and crossover to drill pipe. Check up and down weights. 02:30 - 03:00 0.50 CASE P RUNPRD Circulate liner volume with line on 1 stand of drill pipe (ok) at 4 bpm, 175 psi, 70k up, 70k dn, rig down liner equipment. 03:00 - 06:45 3.75 CASE P RUNPRD Continue to RIH with liner to top window at 10,215', fill pipe every 1 0 stands. 06:45 - 07:15 0.50 CASE P RUNPRD Circulate pipe volume (50 bbls), 97 gpm, 380 psi, 122 gpm, Printed: 1/31/2005 8:01:48 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-37 E-37 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 1/8/2005 1/29/2005 Spud Date: 6/26/1995 End: 1/29/2005 1/25/2005 06:45 - 07:15 0.50 CASE P RUNPRD 400 psi, 170k up, 148k dn, make-up cement head to single and lay down on skate. 07:15 - 09:30 2.25 CEMT P RUNPRD Continue to RIH to 1 joint ffTD wlliner to 13,100' - no problems. 09:30 - 11 :15 1.75 CEMT P RUNPRD Make up cement head, tag bottom, establish circulation and ramp target cementing rate of 6 bpm, 185k up, 145k dn, PJSM with cementer for cement job. 11:15 -13:30 2.25 CEMT P RUNPRD Pressure test cement lines to 4000 psi with water, switch over to cementers, pump 20 bbls CW 100, 30 bbls 9.5 ppg Mud Push, 80 bbls 15.8 ppg tail cement, drop plug, displace cement with perf pill and mud using rig pumps, bump plug, pressure to 3500 psi, cement in place at 12:30 hrs, set hanger with 50K Ibs, TOL at 10,040'. 13:30 - 15:00 1.50 CEMT P RUNPRD Circulate out excess cement at 550 gpm, 1720 psi, 12 bbls cement back to surface, rig down cement hoses and lay down cementing head. 15:00 - 16:00 1.00 CEMT P RUNPRD PJSM, displace well to seawater at 533 gpm, 2189 psi. 16:00 - 20:00 4.00 CEMT P RUNPRD Pull out of hole to 4302'. 20:00 - 21 :30 1.50 CEMT P RUNPRD Run in hole to 7454' to lay down excess drill pipe. 21 :30 - 00:00 2.50 CEMT P RUNPRD Lay down drill pipe from 7454' to 4684'. 1/26/2005 00:00 - 01 :00 1.00 CEMT P RUNPRD Cut and slip drilling line (131'). 01 :00 - 03:30 2.50 CEMT P RUNPRD Finish pull out of hole with liner running tool (rack back 108 stands drill pipe). 03:30 - 04:45 1.25 CASE P RUNPRD Pressure test casing to 3500 psi for 30 minutes - OK. 04:45 - 20:00 15.25 PERFOB P OTHCMP PJSM with Schlumberger and Rig Crew, rig-up to run TCP, run TCP to top wiper plug on landing collar at 13,139' (no problems on TIH - held #2 PJSM at 12,500' prior to tagging TD and perforating the well), 175k up, 150k dn. 20:00 - 20:30 0.50 PER FOB P OTHCMP With TD tag at 13,139', spaced out guns 8' up to place bottom shot at 13,030', circulated well at 42 gpm (100 psi) to get all the air out prior to pressuring the well to initiate the perforating sequence. 20:30 - 21 :00 0.50 PER FOB P OTHCMP Pressure well to 3000 psi, bled off pressure, guns fired per plan (2 sets), initial seawater loss 2.6 bpm, stabilized loss rate at 4 bph. 21 :00 - 22:00 1.00 PERFOB P OTHCMP Monitor well (well on "slight" loss), pull 19 stands t011 ,326' to place perforating assembly above top perforation at 11,340' - no problems. 22:00 - 23:30 1.50 PERFOB P OTHCMP Circulated out well (surface to surface) at 183 gpm, 920 psi, no issues (losses for circulation <10 bbls). 23:30 - 00:00 0.50 PERFOB P OTHCMP Monitor well (well static), blow down top drive, prepare for trip out of hole laying down drill pipe and tubing 1X1(ran hole fill on TOOH to keep hole full). 1/27/2005 00:00 - 10:00 10.00 PERFOB P OTHCMP POOH after perforating well, lay down 323 joints of drill pipe. 10:00 - 17:30 7.50 PERFOB P OTHCMP Continue to pull out of hole laying down 21/16" tubing (55 joints) and perforating guns (1548' of assembly (all guns fired- Perforating Report in DIMS) - PJSM held prior to POOH w/guns. 17:30 - 19:00 1.50 PERFOB P OTHCMP Rig down SWS perforating equipment and clear rig floor. 19:00 - 20:00 1.00 RUNCOMP RUNCMP Pull wear ring and make dummy run with tubing hanger. 20:00 - 21 :00 1.00 RUNCOMP RUNCMP Rig up tubing running equipment. 21 :00 - 00:00 3.00 RUNCOMP RUNCMP PJSM wlall personnel prior to running 12.6# 41/2" 13Cr-80 Vam Top tubing completion, run completion to joint #36 by midnight. Printed: 1/31/2005 8:01 ;48 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-37 E-37 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 1/8/2005 1/29/2005 Spud Date: 6/26/1995 End: 1/29/2005 1/28/2005 00:00 - 05:30 5.50 RUNCOMP RUNCMP Continue to run in hole with the 12.6# 41/2" 13Cr-80 Vam Top completion string joint 36 to joint 130. 05:30 - 06:30 1.00 RUNCOM\J SFAL RUNCMP Rig maintenance, broken hydraulic hose on top drive. 06:30 - 12:00 5.50 RUNCOMP RUNCMP Continue to run in hole with completion string from joint 130 to joint 236, 135k up, 115k dn. 12:00 - 13:00 1.00 RUNCOMP RUNCMP Space out tubing into liner top (10,039' to 10,050'). 13:00 - 14:30 1.50 RUNCOMP RUNCMP Make up tubing hanger and landing joint and rig up to circulate. 14:30 - 17:15 2.75 RUNCOMP RUNCMP Circulate 155 bbls clean seawater, 174 bbls of inhibited seawater to be left between packer and shear valve, followed by 88 bbls seawater, 3 bpm, 180 psi (wellbore cleaned-up nicely throughout the displacement). 17:15 - 17:45 0.50 RUNCOMP RUNCMP Land hanger, RILDS, drop ball & rod, lay down landing joint. 17:45 - 20:30 2.75 RUNCOMP RUNCMP Pressure tubing to 3500 psi to set the packer - held and charted f/30 min, bled off tubing pressure to 1500 psi and tested annulus to 3500 psi - held and charted f/30 min, bled down annulus to 0 psi, bled down tubing to 0 psi, pressured annulus to @ 2400 psi shear the DCK valve, circulated both ways at 3 bpm to confirm shear - OK. 20:30 - 21:15 0.75 RUNCOMP RUNCMP Blow down lines, set TWC & test to 1000 psi, blow down lines. 21 :15 - 22:30 1.25 BOPSUF P OTHCMP ND BOP's. 22:30 - 00:00 1.50 WHSUR P OTHCMP NU adapter flange and tree. 1/29/2005 00:00-01:15 1.25 WHSUR P OTHCMP Complete NU adapter and tree, test adaptor, tree and pack-ff to 5000 psi. 01:15 - 01:45 0.50 WHSUR P RUNCMP Pull TWC w/ DSM lubricator. . 01:45 - 04:15 2.50 WHSUR P RUNCMP Freeze protect well to 2200' with 91 bbls of warm diesel. Allow diesel to U-Tube. 04:15 - 06:00 1.75 WHSUR P RUNCMP R/U DSM lubricator & set BPV. Test from below to 1000 psi. Install VR Plugs in tubing spool. Secure well RELEASE RIG @ 06:00 Hrs. - 1/29/2005 Printed: 1/31/2005 8:01:48 AM E-37 A Survey Report S lumberger Report Date: 23-Jan-05 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 272.650' Field: Prudhoe Bay Unit· WOA Vertical Section Origin: N 0.000 It, E 0.000 It Structure I Slot: E-PAD / E-37 TVD Reference Datum: Rotary Table Well: E-37 TVD Reference Elevation: 57.05 It relative to MSL Borehole: E-37A Sea Bed I Ground Level Elevation: 28.05 It relative to MSL UWVAPI#: 500292257101 Magnetic Declination: 24.937' Survey Name I Date: E-37 A / January 23, 2005 Total Field Strength: 57631.692 nT Tort I AHD I DOli ERD ratio: 299.896' /7589.90 It /6.5211 0.849 Magnetic Dip: 80.877' Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declinalion Date: January 23. 2005 . Location LatlLong: N 70.33848018, W 148.66832719 Magnelic Declinalion Model: BGGM 2004 Localion Grid N/E YIX: N 5975167.410 ItUS, E 664107.510 ItUS North Reference: True North Grid Convergence Angle: + 1.25405755' Tolal Corr Mag North -> True North: +24.937' Grid Scale Factor: 0.99993059 Local Coordinates Referenced To: Well Head I Commenls Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Verlical I Along Hole I Closure I NS EW I DLS Northing Easting Lalitude Longitude Deplh Seclion Deparlure (II) (deg) (deg) ( II) (II) ( fl) ( II) (II) (fl) (II) (deg/100 II) (IIUS) (IIUS) RTE 0.00 0.01 25.40 -57.05 0.00 -0.14 0.00 0.37 0.33 0.16 0.00 5975167.74 664107.66 N 70.33848109 W 148.66832591 MWD (Standard) 202.95 0.20 25.40 145.90 202.95 -0.28 0.37 0.73 0.66 0.31 0.10 5975168.08 664107.81 N 70.33848199 W 148.66832464 292.46 0.10 323.00 235.41 292.46 -0.29 0.58 0.93 0.87 0.33 0.20 5975168.28 664107.83 N 70.33848255 W 148.66832448 381.30 0.30 30.20 324.25 381.30 -0.35 0.86 1.20 1.13 0.40 0.31 5975168.55 664107.89 N 70.33848327 W 148.66832391 468.31 0.20 316.20 411.26 468.31 -0.35 1.20 1.49 1.43 0.41 0.36 5975168.85 664107.89 N 70.33848410 W 148.66832383 563.27 0.60 9.90 506.22 563.27 -0.29 1.82 2.08 2.04 0.38 0.53 5975169.46 664107.85 N 70.33848577 W 148.66832407 651.62 0.60 355.80 594.56 651.61 -0.29 2.74 2.99 2.96 0.43 0.17 5975170.38 664107.88 N 70.33848827 W 148.66832370 742.18 0.80 314.80 685.11 742.16 0.23 3.80 3.88 3.88 -0.05 0.58 5975171.29 664107.37 N 70.33849078 W 148.66832762 772.14 1.00 318.30 715.07 772.12 0.57 4.27 4.24 4.22 -0.38 0.69 5975171.62 664107.04 N 70.33849172 W 148.66833023 801.67 1.00 301.60 744.60 801.65 0.98 4.78 4.61 4.55 -0.77 0.98 5975171.94 664106.64 N 70.33849261 W 148.66833341 831.87 1.30 268.90 774.79 831.84 1.55 5.37 4.87 4.68 -1.33 2.35 5975172.06 664106.07 N 70.33849297 W 148.6ltr 861.59 2.00 247.60 804.50 861.55 2.35 6.22 4.97 4.48 -2.15 3.09 5975171.84 664105.26 N 70.33849241 W 148.6 3 891.18 2.70 241.10 834.06 891.11 3.42 7.43 5.10 3.94 -3.24 2.53 5975171.28 664104.19 N 70.33849096 W 148.668 5345 920.86 3.50 242.10 863.70 920.75 4.79 9.04 5.63 3.18 -4.65 2.70 5975170.49 664102.79 N 70.33848887 W 148.66836492 950.39 3.80 242.50 893.17 950.22 6.41 10.92 6.72 2.31 -6.31 1.02 5975169.58 664101.15 N 70.33848649 W 148.66837842 979.92 4.20 233.20 922.63 979.68 8.10 12.97 8.14 1.21 -8.05 2.58 5975168.44 664099.44 N 70.33848348 W 148.66839249 1039.14 4.80 222.60 981.67 1038.72 11.36 17.61 11.62 -1.91 -11.46 1.73 5975165.25 664096.09 N 70.33847495 W 148.66842018 1102.83 5.50 222.20 1045.10 1102.15 15.02 23.32 16.50 -6.14 -15.32 1.10 5975160.94 664092.33 N 70.33846342 W 148.66845145 1198.46 5.90 217.80 1140.26 1197.31 20.76 32.82 25.26 -13.42 -21.41 0.62 5975153.53 664086.40 N 70.33844353 W 148.66850087 1294.24 6.30 208.60 1235.50 1292.55 25.90 42.97 34.73 -21.92 -26.94 1.10 5975144.91 664081.06 N 70.33842030 W 148.66854576 1388.81 6.50 203.40 1329.48 1386.53 30.06 53.51 44.50 -31.39 -31.55 0.65 5975135.34 664076.66 N 70.33839443 W 148.66858316 1483.81 6.80 203.50 1423.84 1480.89 33.97 64.51 54.88 -41 .48 -35.93 0.32 5975125.16 664072.50 N 70.33836686 W 148.66861868 1578.34 7.20 203.30 1517.66 1574.71 38.05 76.03 65.95 -52.05 -40.50 0.42 5975114.49 664068.16 N 70.33833798 W 148.66865579 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Sld( d031 rt-546 ) E-37IE-37IE-37 AIE-37 A Generated 3/3/200511 :10 AM Page 1 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) ( It) (It) (It) (It) ( It) (It) (It) (deg/100 It) (ltUS) (ltUS) 1672.98 6.70 203.40 1611.61 1668.66 42.10 87.48 77.09 -62.57 -45.04 0.53 5975103.88 664063.85 N 70.33830925 W 148.66869262 1767.25 8.10 203.90 1705.09 1762.14 46.46 99.62 89.00 -73.69 -49.92 1.49 5975092.65 664059.22 N 70.33827888 W 148.66873217 1862.93 9.50 209.30 1799.64 1856.69 52.44 114.25 103.52 -86.74 -56.51 1.70 5975079.46 664052.91 N 70.33824323 W 148.66878568 1925.49 10.20 211.10 1861.28 1918.33 57.40 124.95 114.21 -95.98 -61.90 1.22 5975070.10 664047.73 N 70.33821797 W 148.66882939 2020.81 10.30 212.10 1955.08 2012.13 65.61 141.91 131.17 -110.43 -70.79 0.21 5975055.47 664039.16 N 70.33817850 W 148.66890149 2116.93 10.60 204.30 2049.61 2106.66 73.09 159.32 148.51 -125.77 -78.99 1.50 5975039.95 664031.29 N 70.33813660 W 148.66896806 2211.02 12.40 199.40 2141.81 2198.86 79.20 178.07 166.98 -143.18 -85.91 2.18 5975022.39 664024.76 N 70.33808902 W 148.66902418 2306.11 14.30 202.40 2234.33 2291.38 86.11 200.02 188.63 -163.67 -93.78 2.13 5975001.74 664017.34 N 70.33803304 W 148.66908801 2399.27 16.10 206.70 2324.23 2381.28 95.26 224.43 212.96 -185.85 -103.97 2.28 5974979.34 664007.64 N 70.33797245 W 148.66917067 2494.11 16.80 208.80 2415.18 2472.23 106.66 251.28 239.80 -209.61 -116.48 0.97 5974955.31 663995.66 N 70.33790754 W 148.66927218 2590.20 18.10 211.60 2506.85 2563.90 120.01 280.09 268.60 -234.50 -130.99 1.61 5974930.12 663981.69 N 70.33783956 W 148.6.1 2685.03 20.30 216.30 2596.41 2653.46 136.26 311.26 299.66 -260.30 -148.45 2.83 5974903.94 663964.80 N 70.33776905 W 148.6 6 2778.67 22.10 220.90 2683.71 2740.76 156.17 345.11 333.12 -286.71 -169.60 2.62 5974877.07 663944.23 N 70.33769690 W 148.66970317 2872.59 24.20 219.10 2770.07 2827.12 178.54 382.03 369.60 -315.01 -193.31 2.36 5974848.27 663921.15 N 70.33761960 W 148.66989553 2966.01 25.90 217.70 2854.70 2911.75 201.64 421.58 408.89 -346.01 -217.87 1.93 5974816.73 663897.28 N 70.33753489 W 148.67009473 3060.72 26.60 216.70 2939.64 2996.69 225.39 463.47 450.64 -379.38 -243.19 0.87 5974782.82 663872.70 N 70.33744373 W 148.67030016 3156.09 27.90 219.70 3024.43 3081 .48 250.79 507.12 494.10 -413.67 -270.21 1.98 5974747.95 663846.44 N 70.33735005 W 148.67051932 3250.87 29.60 222.60 3107.52 3164.57 279.19 552.70 539.27 -447.97 -300.22 2.32 5974713.01 663817.19 N 70.33725636 W 148.67076279 3345.63 31.70 223.90 3189.04 3246.09 310.63 601.01 586.97 -483.14 -333.33 2.32 5974677.13 663784.86 N 70.33716027 W 148.67103138 3441.18 34.10 226.40 3269.27 3326.32 345.71 652.90 638.04 -519.71 -370.14 2.89 5974639.77 663748.86 N 70.33706037 W 148.67133001 3534.56 34.50 227.80 3346.41 3403.46 382.57 705.52 689.66 -555.52 -408.69 0.95 5974603.12 663711.11 N 70.33696251 W 148.67164272 3629.71 35.90 229.40 3424.16 3481.21 421.99 760.36 743.34 -591.78 -449.83 1.76 5974565.97 663670.77 N 70.33686345 W 148.67197651 3720.16 37.60 231.60 3496.63 3553.68 462.12 814.47 796.10 -626.18 -491.60 2.38 5974530.66 663629.77 N 70.33676946 W 148.67231531 3921.06 38.60 231 .40 3654.73 3711.78 555.46 938.44 917.15 -703.35 -588.61 0.50 5974451.40 663534.48 N 70.33655863 W 148.67310227 4016.08 38.60 230.90 3728.99 3786.04 599.86 997.72 975.36 -740.54 -634.78 0.33 5974413.21 663489.14 N 70.33645703 W 148.67347677 4105.76 35.30 232.00 3800.65 3857.70 640.40 1051.62 1028.35 -774.14 -676.92 3.75 5974378.69 663447.75 N 70.33636521 W 148.67381861 4201.31 34.00 229.00 3879.25 3936.30 680.68 1105.93 1081.98 -808.67 -718.84 2.24 5974343.26 663406.59 N 70.33627087 W 148.67415867 4297.13 35.20 230.70 3958.13 4015.18 720.61 1160.34 1135.85 -843.74 -760.43 1.61 5974307.29 663365.78 N 70.33617505 W 148..06 4396.44 35.60 229.30 4039.08 4096.13 762.92 1217.87 1192.85 -880.72 -804.50 0.91 5974269.36 663322.54 N 70.33607402 W 148. 49 4488.62 35.40 230.10 4114.12 4171.17 802.09 1271.39 1245.96 -915.34 -845.32 0.55 5974233.85 663282.49 N 70.33597942 W 148.6 63 4583.76 36.40 228.60 4191.19 4248.24 842.69 1327.18 1301.39 -951.69 -887.64 1.40 5974196.59 663240.98 N 70.33588011 W 148.67552789 4676.87 36.40 228.10 4266.14 4323.19 882.23 1382.43 1356.41 -988.41 -928.92 0.32 5974158.98 663200.51 N 70.33577978 W 148.67586277 4771.98 36.10 229.50 4342.84 4399.89 922.78 1438.67 1412.39 -1025.45 -971.23 0.93 5974121.02 663159.02 N 70.33567857 W 148.67620597 4867.55 36.00 228.80 4420.11 4477.16 963.58 1494.91 1468.36 -1062.24 -1013.78 0.44 5974083.32 663117.30 N 70.33557806 W 148.67655104 4963.25 36.00 229.70 4497.53 4554.58 1 004.45 1551.16 1524.36 -1098.95 -1056.39 0.55 5974045.68 663075.50 N 70.33547773 W 148.67689667 5057.11 36.00 230.20 4573.47 4630.52 1044.99 1606.33 1579.22 -1134.45 -1098.62 0.31 5974009.27 663034.06 N 70.33538073 W 148.67723921 5149.28 36.60 230.20 4647.75 4704.80 1085.26 1660.90 1633.49 -1169.38 -1140.54 0.65 5973973.43 662992.91 N 70.33528530 W 148.67757924 5246.85 36.90 228.80 4725.93 4782.98 1127.84 1719.27 1691.63 -1207.30 -1184.93 0.91 5973934.56 662949.37 N 70.33518170 W 148.67793926 5341.34 36.80 228.30 4801.54 4858.59 1168.54 1775.94 1748.16 -1244.81 -1227.40 0.33 5973896.13 662907.73 N 70.33507920 W 148.67828376 5436.49 36.60 229.30 4877.83 4934.88 1209.54 1832.80 1804.87 -1282.26 -1270.19 0.66 5973857.75 662865.78 N 70.33497686 W 148.67863076 5531.11 36.50 228.60 4953.84 5010.89 1250.28 1889.15 1861.07 -1319.27 -1312.68 0.45 5973819.83 662824.11 N 70.33487575 W 148.67897542 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( do31 rt-546 ) E-37\E-37\E-37 A\E-37 A Generated 3/3/2005 11: 1 0 AM Page 2 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) (It) (It) (II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS) 5627.43 37.30 230.00 5030.87 5087.92 1292.34 1946.98 1918.73 -1356.97 -1356.53 1.20 5973781.17 662781.10 N 70.33477272 W 148.67933103 5722.25 36.70 230.20 5106.59 5163.64 1334.37 2004.05 1975.58 -1393.58 -1400.30 0.65 5973743.62 662738.14 N 70.33467270 W 148.67968609 5816.88 36.80 229.50 5182.42 5239.47 1375.92 2060.66 2032.01 -1430.08 -1443.58 0.46 5973706.18 662695.67 N 70.33457294 W 148.68003708 5911.92 36.80 230.60 5258.52 5315.57 1417.82 2117.59 2088.75 -1466.64 -1487.22 0.69 5973668.68 662652.85 N 70.33447305 W 148.68039103 6007.69 36.30 229.70 5335.45 5392.50 1459.87 2174.63 2145.59 -1503.18 -1531.01 0.77 5973631.19 662609.87 N 70.33437319 W 148.68074615 6103.39 36.40 232.30 5412.54 5469.59 1502.25 2231.34 2202.05 -1538.87 -1575.08 1.61 5973594.55 662566.59 N 70.33427567 W 148.68110360 6197.53 37.10 234.10 5487.97 5545.02 1545.74 2287.67 2257.89 -1572.60 -1620.19 1.36 5973559.84 662522.24 N 70.33418349 W 148.68146939 6293.94 37.10 232.70 5564.87 5621.92 1590.78 2345.82 2315.55 -1607.27 -1666.87 0.88 5973524.16 662476.33 N 70.33408874 W 148.68184802 6388.96 37.20 232.50 5640.60 5697.65 1634.70 2403.20 2372.57 -1642.13 -1712.46 0.17 5973488.32 662431.52 N 70.33399350 W 148.68221773 6483.23 37.30 230.70 5715.64 5772.69 1677.73 2460.26 2429.38 -1677.57 -1757.17 1.16 5973451.91 662387.60 N 70.33389665 W 148.68258035 6571.90 37.30 233.20 5786.18 5843.23 1718.46 2513.99 2482.85 -1710.68 -1799.48 1.71 5973417.88 662346.03 N 70.33380616 W 148.68.5 6673.80 37.70 231.10 5867.03 5924.08 1765.62 2576.02 2544.57 -1748.74 -1848.45 1.31 5973378.76 662297.91 N 70.33370215 W 148.68 61 6767.59 37.80 231.00 5941.19 5998.24 1808.56 2633.44 2601.82 -1784.84 -1893.10 0.13 5973341.70 662254.05 N 70.33360351 W 148.68368275 6862.91 38.00 230.80 6016.40 6073.45 1852.24 2691.99 2660.22 -1821.77 -1938.54 0.25 5973303.79 662209.44 N 70.33350259 W 148.68405125 6957.03 36.80 231.00 6091.17 6148.22 1894.89 2749.16 2717.24 -1857.82 -1982.91 1.28 5973266.77 662165.88 N 70.33340406 W 148.68441101 7052.26 37.30 230.90 6167.17 6224.22 1937.73 2806.53 2774.48 -1893.97 -2027.46 0.53 5973229.66 662122.12 N 70.33330528 W 148.68477235 7148.27 37.50 231.90 6243.45 6300.50 1981.57 2864.85 2832.62 -1930.35 -2073.04 0.67 5973192.30 662077.36 N 70.33320586 W 148.68514192 7242.85 37.60 231.60 6318.43 6375.48 2025.14 2922.49 2890.07 -1966.03 -2118.30 0.22 5973155.63 662032.89 N 70.33310833 W 148.68550901 7338.47 37.50 230.90 6394.24 6451.29 2068.85 2980.76 2948.20 -2002.51 -2163.75 0.46 5973118.17 661988.25 N 70.33300865 W 148.68587756 7433.61 37.10 230.60 6469.92 6526.97 2111.77 3038.42 3005.74 -2038.99 -2208.40 0.46 5973080.73 661944.42 N 70.33290896 W 148.68623961 7529.41 36.90 231.30 6546.43 6603.48 2154.81 3096.07 3063.28 -2075.31 -2253.17 0.49 5973043.44 661900.45 N 70.33280970 W 148.68660267 7625.12 36.70 230.40 6623.07 6680.12 2197.55 3153.40 3120.51 -2111.50 -2297.63 0.60 5973006.28 661856.80 N 70.33271078 W 148.68696320 7719.12 36.60 231.60 6698.49 6755.54 2239.48 3209.51 3176.51 -2146.81 -2341.24 0.77 5972970.03 661813.98 N 70.33261427 W 148.68731678 7812.80 36.60 231.30 6773.70 6830.75 2281.50 3265.37 3232.23 -2181.62 -2384.92 0.19 5972934.27 661771.08 N 70.33251914 W 148.68767099 7906.65 36.40 231.30 6849.14 6906.19 2323.41 3321.19 3287.94 -2216.53 -2428.49 0.21 5972898.43 661728.29 N 70.33242375 W 148.68802427 8001.38 36.20 231.10 6925.48 6982.53 2365.44 3377.27 3343.91 -2251.67 -2472.19 0.25 5972862.34 661685.36 N 70.33232771 W 148.68837867 8092.55 37.10 229.50 6998.63 7055.68 2405.65 3431.69 3398.27 -2286.43 -2514.06 1.44 5972826.67 661644.27 N 70.33223269 W 148.68871812 8187.92 37.80 231.10 7074.34 7131.39 2448.51 3489.68 3456.20 -2323.47 -2558.67 1.26 5972788.67 661600.48 N 70.33213148 W 148.6.91 8282.42 37.70 230.70 7149.06 7206.11 2491.68 3547.53 3513.97 -2359.95 -2603.57 0.28 5972751.21 661556.39 N 70.33203175 W 148.6 96 8374.17 37.30 231.30 7221.85 7278.90 2533.41 3603.39 3569.74 -2395.10 -2646.98 0.59 5972715.12 661513.77 N 70.33193568 W 148.6 91 8470.39 36.40 230.00 7298.85 7355.90 2576.30 3661.09 3627.37 -2431.69 -2691.60 1.24 5972677.58 661469.96 N 70.33183570 W 148.69015774 8564.53 35.70 230.40 7374.96 7432.01 2617.17 3716.49 3682.73 -2467.15 -2734.16 0.78 5972641.19 661428.19 N 70.33173878 W 148.69050283 8658.36 35.80 230.70 7451.11 7508.16 2657.85 3771.31 3737.49 -2501.98 -2776.49 0.22 5972605.44 661386.63 N 70.33164358 W 148.69084606 8752.03 36.10 231.10 7526.94 7583.99 2698.87 3826.30 3792.41 -2536.66 -2819.17 0.41 5972569.84 661344.73 N 70.33154879 W 148.69119208 8845.85 37.30 229.70 7602.17 7659.22 2740.37 3882.37 3848.43 -2572.41 -2862.36 1.56 5972533.16 661302.33 N 70.33145109 W 148.69154228 8939.07 37.30 230.70 7676.32 7733.37 2782.05 3938.86 3904.88 -2608.57 -2905.76 0.65 5972496.06 661259.74 N 70.33135226 W 148.69189416 9033.75 36.20 232.70 7752.18 7809.23 2824.82 3995.50 3961.41 -2643.68 -2950.21 1.72 5972459.99 661216.08 N 70.33125628 W 148.69225450 9128.16 36.00 232.80 7828.47 7885.52 2867.50 4051.13 4016.86 -2677.35 -2994.48 0.22 5972425.36 661172.55 N 70.33116425 W 148.69261351 9219.73 35.60 233.90 7902.74 7959.79 2908.94 4104.69 4070.21 -2709.33 -3037.46 0.83 5972392.45 661130.29 N 70.33107685 W 148.69296192 9315.68 36.60 232.50 7980.26 8037.31 2952.59 4161.22 4126.53 -2743.20 -3082.72 1.35 5972357.60 661085.78 N 70.33098427 W 148.69332888 9344.85 37.10 231.80 8003.61 8060.66 2965.89 4178.72 4143.99 -2753.93 -3096.53 2.24 5972346.57 661072.21 N 70.33095493 W 148.69344087 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) E-37\E-37\E-37 A\E-37 A Generated 3/3/200511 :10 AM Page 3 01 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure ( It) (deg) (deg) (It) ( It) (It) (It) (It) (It) (It) (deg/100 It) (ltUS) (flUS) 9407.55 37.80 232.00 8053.38 8110.43 2994.77 4216.84 4182.04 -2777.46 -3126.53 1.13 5972322.40 661042.73 N 70.33089063 W 148.69368411 9502.64 37.70 230.40 8128.57 8185.62 3038.41 4275.06 4240.18 -2813.93 -3171.90 1.04 5972284.94 660998.18 N 70.33079093 W 148.69405193 9596.86 37.20 231.30 8203.37 8260.42 3081.11 4332.35 4297.42 -2850.10 -3216.33 0.79 5972247.81 660954.56 N 70.33069206 W 148.69441212 9688.41 36.50 231.80 8276.63 8333.68 3122.49 4387.25 4352.25 -2884.25 -3259.32 0.83 5972212.73 660912.32 N 70.33059873 W 148.69476071 9718.70 36.20 232.70 8301.02 8358.07 3136.16 4405.20 4370.16 -2895.24 -3273.52 2.02 5972201.44 660898.37 N 70.33056869 W 148.69487579 9758.35 35.19 234.31 8333.23 8390.28 3154.09 4428.34 4393.21 -2909.00 -3292.11 3.48 5972187.27 660880.08 N 70.33053107 W 148.69502654 9790.66 36.01 234.98 8359.50 8416.55 3168.92 4447.14 4411.91 -2919.88 -3307.45 2.81 5972176.06 660864.99 N 70.33050132 W 148.69515091 9821.74 38.89 237.72 8384.17 8441.22 3184.15 4466.04 4430.63 -2930.34 -3323.19 10.70 5972165.26 660849.48 N 70.33047274 W 148.69527849 9854.93 42.39 238.78 8409.35 8466.40 3201.99 4487.65 4451.93 -2941.70 -3341.57 10.75 5972153.49 660831.36 N 70.33044166 W 148.69542753 9886.47 44.85 239.43 8432.18 8489.23 3220.12 4509.41 4473.33 -2952.87 -3360.24 7.93 5972141.92 660812.94 N 70.33041113 W 148.69557891 9916.46 45.35 239.82 8453.35 8510.40 3237.93 4530.65 4494.19 -2963.61 -3378.57 1.90 5972130.78 660794.85 N 70.33038176 W 148.69. 9948.67 46.17 240.59 8475.82 8532.87 3257.41 4553.73 4516.81 -2975.08 -3398.59 3.07 5972118.88 660775.08 N 70.33035041 W 148.69 7 9977.91 48.55 241. 71 8495.63 8552.68 3275.75 4575.24 4537.82 -2985.45 -3417.43 8.61 5972108.10 660756.47 N 70.33032205 W 148.69604263 10009.05 49.96 243.37 8515.95 8573.00 3296.16 4598.83 4560.74 -2996.33 -3438.37 6.07 5972096.77 660735.78 N 70.33029231 W 148.69621236 10041.09 50.76 243.51 8536.39 8593.44 3317.69 4623.50 4584.63 -3007.36 -3460.44 2.52 5972085.26 660713.96 N 70.33026215 W 148.69639130 10072.77 50.82 244.02 8556.42 8613.47 3339.18 4648.05 4608.37 -3018.21 -3482.45 1.26 5972073.93 660692.19 N 70.33023248 W 148.69656983 10104.20 50.98 243.13 8576.24 8633.29 3360.50 4672.44 4631.99 -3029.07 -3504.30 2.26 5972062.60 660670.59 N 70.33020279 W 148.69674693 10130.42 50.87 243.55 8592.77 8649.82 3378.25 4692.79 4651.73 -3038.20 -3522.49 1.31 5972053.07 660652.61 N 70.33017782 W 148.69689442 10162.59 50.97 243.81 8613.05 8670.10 3400.10 4717.76 4675.91 -3049.27 -3544.87 0.70 5972041.51 660630.47 N 70.33014754 W 148.69707590 MWD (Standard) 10192.49 51.25 243.93 8631.82 8688.87 3420.50 4741.04 4698.44 -3059.52 -3565.77 0.99 5972030.81 660609.81 N 70.33011951 W 148.69724532 Tie-In Survey 10192.49 51.25 243.93 8631.82 8688.87 3420.50 4741.04 4698.44 -3059.52 -3565.77 0.00 5972030.81 660609.81 N 70.33011951 W 148.69724532 Top Window 10215.00 51.04 243.59 8645.95 8703.00 3435.84 4758.57 4715.42 -3067.27 -3581.49 1.50 5972022.72 660594.26 N 70.33009832 W 148.69737280 Base Window 10227.00 51.40 246.00 8653.46 8710.51 3444.11 4767.92 4724.44 -3071.25 -3589.95 15.94 5972018.55 660585.89 N 70.33008743 W 148.69744142 Blind Projection 10233.00 51.40 246.00 8657.21 8714.26 3448.30 4772.61 4728.94 -3073.16 -3594.24 0.00 5972016.55 660581.65 N 70.33008221 W 148.69747615 Blind ( Inc Only) 10249.62 51.95 248.82 8667.51 8724.56 3460.10 4785.65 4741.34 -3078.17 -3606.27 13.72 5972011.28 660569.72 N 70.33006852 W 148.69757375 10276.79 51.11 253.49 8684.42 8741.47 3479.88 4806.91 4761.11 -3085.04 -3626.39 13.81 5972003.97 660549.76 N 70.33004972 W 148.69773690 Last Blind ( Inc Only) 10310.85 50.70 259.38 8705.91 8762.96 3505.24 4833.34 4784.70 -3091.24 -3652.07 13.47 5971997.21 660524.23 N 70.33003275 W 148.69794509 First MWD+IFR+MS 1 0344.45 50.61 263.27 8727.22 8784.27 3530.71 4859.32 4806.85 -3095.16 -3677.75 8.96 5971992.73 660498.64 N 70.33002201 W 148.6.3 10373.43 51.45 267.67 8745.45 8802.50 3553.05 4881.85 4825.19 -3096.93 -3700.20 12.15 5971990.47 660476.24 N 70.33001713 W 148.6 9 10407.11 53.22 273.76 8766.04 8823.09 3579.68 4908.50 4845.42 -3096.58 -3726.83 15.24 5971990.23 660449.60 N 70.33001805 W 148.6 41 10437.63 54.69 278.78 8784.01 8841.06 3604.29 4933.17 4862.58 -3093.88 -3751.35 14.14 5971992.40 660425.04 N 70.33002540 W 148.69875023 10469.20 55.98 285.45 8801.98 8859.03 3629.88 4959.12 4878.72 -3088.42 -3776.71 17.85 5971997.30 660399.56 N 70.33004027 W 148.69895593 10505.54 59.48 290.21 8821.38 8878.43 3659.51 4989.84 4895.44 -3079.00 -3805.93 14.67 5972006.08 660370.14 N 70.33006599 W 148.69919299 10539.26 61.57 292.21 8837.98 8895.03 3687.33 5019.19 4910.10 -3068.37 -3833.29 8.07 5972016.10 660342.56 N 70.33009497 W 148.69941493 10564.85 63.04 289.36 8849.87 8906.92 3708.86 5041.85 4921.65 -3060.34 -3854.48 11.41 5972023.67 660321.21 N 70.33011689 W 148.69958674 10600.08 66.65 290.18 8864.84 8921.89 3739.33 5073.73 4938.51 -3049.55 -3884.48 10.46 5972033.80 660290.98 N 70.33014632 W 148.69983011 10633.17 70.26 286.64 8877.00 8934.05 3768.94 5104.51 4955.55 -3039.84 -3913.67 14.76 5972042.86 660261.58 N 70.33017280 W 148.70006693 10663.01 73.46 283.96 8886.29 8943.34 3796.61 5132.86 4972.62 -3032.37 -3941.02 13.70 5972049.74 660234.07 N 70.33019318 W 148.70028874 10715.06 74.66 288.12 8900.59 8957.64 3845.28 5182.90 5002.45 -3018.54 -3989.11 8.02 5972062.51 660185.70 N 70.33023089 W 148.70067877 10748.56 75.69 287.51 8909.16 8966.21 3876.54 5215.29 5021.13 -3008.63 -4019.94 3.54 5972071.74 660154.66 N 70.33025791 W 148.70092886 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) E-37\E-37\E-37 A\E-37 A Generated 3/3/200511 :10 AM Page 4 of 7 Comments Measured I Inclination I Azimuth I Sub·Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (It) (It) (It) (deg/100 It) (ltUS) (ltUS) 10777.68 75.62 284.95 8916.37 8973.42 3903.96 5243.50 5038.14 -3000.75 -4047.02 8.52 5972079.03 660127.41 N 70.33027941 W 148.70114856 10811.17 75.65 287.01 8924.68 8981.73 3935.52 5275.94 5057.94 -2991.82 -4078.21 5.96 5972087.28 660096.04 N 70.33030376 W 148.70140153 10843.05 76.64 285.01 8932.32 8989.37 3965.64 5306.90 5076.94 -2983.28 -4107.96 6.84 5972095.16 660066.11 N 70.33032704 W 148.70164284 10874.15 79.41 284.80 8938.77 8995.82 3995.37 5337.32 5096.18 -2975.46 -4137.36 8.93 5972102.34 660036.55 N 70.33034837 W 148.70188129 10905.55 82.43 283.28 8943.73 9000.78 4025.76 5368.32 5116.26 -2967.94 -4167.43 10.74 5972109.20 660006.32 N 70.33036887 W 148.70212524 10939.38 85.43 282.01 8947.30 9004.35 4058.88 5401.96 5138.79 -2960.57 -4200.25 9.62 5972115.84 659973.35 N 70.33038893 W 148.70239144 10969.20 87.87 282.76 8949.05 9006.10 4088.22 5431.72 5158.92 -2954.19 -4229.33 8.56 5972121.58 659944.15 N 70.33040633 W 148.70262727 11001.73 90.48 280.09 8949.51 9006.56 4120.36 5464.25 5181.42 -2947.75 -4261.21 11.48 5972127.33 659912.14 N 70.33042387 W 148.70288582 11036.33 92.95 279.02 8948.48 9005.53 4154.69 5498.83 5206.25 -2942.01 -4295.31 7.78 5972132.32 659877.92 N 70.33043950 W 148.70316241 11063.42 95.15 278.79 8946.57 9003.62 4181.55 5525.85 5225.95 -2937.82 -4322.00 8.17 5972135.92 659851.14 N 70.33045089 W 148.70337892 11096.83 95.46 278.67 8943.48 9000.53 4214.63 5559.12 5250.35 -2932.78 -4354.88 0.99 5972140.24 659818.16 N 70.33046463 W 148.7.2 11128.51 93.95 279.68 8940.88 8997.93 4246.00 5590.69 5273.43 -2927.74 -4386.05 5.73 5972144.59 659786.89 N 70.33047833 W 148.7 2 11159.30 91.54 281.39 8939.40 8996.45 4276.46 5621 .44 5295.50 -2922.12 -4416.28 9.59 5972149.55 659756.55 N 70.33049365 W 148.70 63 11192.33 90.68 281.00 8938.76 8995.81 4309.12 5654.46 5319.03 -2915.71 -4448.68 2.86 5972155.25 659724.02 N 70.33051111 W 148.70440639 11224.77 90.20 279.58 8938.51 8995.56 4341.26 5686.90 5342.59 -2909.91 -4480.60 4.62 5972160.35 659691.99 N 70.33052689 W 148.70466526 11254.65 90.10 279.81 8938.44 8995.49 4370.92 5716.78 5364.59 -2904.88 -4510.05 0.84 5972164.73 659662.43 N 70.33054059 W 148.70490416 11288.80 90.41 279.18 8938.28 8995.33 4404.83 5750.93 5389.91 -2899.25 -4543.73 2.06 5972169.63 659628.64 N 70.33055592 W 148.70517735 11321.51 92.57 279.11 8937.43 8994.48 4437.31 5783.63 5414.37 -2894.05 -4576.01 6.61 5972174.12 659596.26 N 70.33057006 W 148.70543918 11351.14 94.49 278.63 8935.61 8992.66 4466.71 5813.20 5436.66 -2889.49 -4605.23 6.68 5972178.04 659566.95 N 70.33058247 W 148.70567617 11383.51 95.49 278.91 8932.79 8989.84 4498.77 5845.45 5461.09 -2884.57 -4637.10 3.21 5972182.25 659534.98 N 70.33059585 W 148.70593466 11416.77 95.46 278.61 8929.62 8986.67 4531.69 5878.56 5486.25 -2879.53 -4669.82 0.90 5972186.58 659502.16 N 70.33060957 W 148.70620006 11446.31 94.87 277.13 8926.96 8984.01 4560.99 5907.98 5508.97 -2875.50 -4698.96 5.37 5972189.97 659472.94 N 70.33062052 W 148.70643643 11479.90 92.61 277.86 8924.77 8981.82 4594.39 5941 .49 5535.08 -2871.13 -4732.19 7.07 5972193.61 659439.62 N 70.33063241 W 148.70670596 11511.85 92.23 276.76 8923.42 8980.47 4626.20 5973.41 5560.07 -2867.07 -4763.85 3.64 5972196.98 659407.88 N 70.33064345 W 148.70696275 11542.63 92.50 274.48 8922.15 8979.20 4656.91 6004.17 5584.77 -2864.06 -4794.46 7.45 5972199.32 659377.22 N 70.33065163 W 148.70721097 11577.77 92.26 271.90 8920.69 8977.74 4692.02 6039.28 5613.90 -2862.10 -4829.51 7.37 5972200.51 659342.14 N 70.33065690 W 148.70749526 11606.87 92.40 270.84 8919.51 8976.56 4721.09 6068.35 5638.57 -2861.41 -4858.58 3.67 5972200.56 659313.06 N 70.33065875 W 148.70773101 11638.04 90.89 271.10 8918.61 8975.66 4752.23 6099.51 5665.17 -2860.88 -4889.73 4.92 5972200.41 659281.91 N 70.33066014 W 148.70798366 11669.69 90.31 269.16 8918.28 8975.33 4783.85 6131.16 5692.47 -2860.81 -4921.38 6.40 5972199.79 659250.27 N 70.33066027 W 148.7.2 11702.05 90.51 267.53 8918.05 8975.10 4816.11 6163.52 5720.92 -2861.74 -4953.72 5.07 5972198.15 659217.96 N 70.33065766 W 148.7 3 11734.32 89.55 264.76 8918.03 8975.08 4848.17 6195.79 5749.90 -2863.91 -4985.92 9.08 5972195.27 659185.82 N 70.33065168 W 148.70876371 11766.19 89.17 264.44 8918.39 8975.44 4879.73 6227.65 5778.92 -2866.91 -5017.64 1.56 5972191.58 659154.17 N 70.33064343 W 148.70902101 11798.42 89.41 264.98 8918.79 8975.84 4911.64 6259.88 5808.27 -2869.88 -5049.73 1.83 5972187.91 659122.15 N 70.33063525 W 148.70928124 11829.43 89.52 265.00 8919.08 8976.13 4942.38 6290.89 5836.48 -2872.59 -5080.62 0.36 5972184.53 659091.33 N 70.33062780 W 148.70953175 11861.25 89.59 265.16 8919.33 8976.38 4973.92 6322.71 5865.43 -2875.32 -5112.32 0.55 5972181.10 659059.70 N 70.33062028 W 148.70978884 11893.61 89.55 265.65 8919.57 8976.62 5006.02 6355.07 5894.84 -2877.91 -5144.58 1.52 5972177.81 659027.51 N 70.33061314 W 148.71005042 11924.96 89.45 265.53 8919.84 8976.89 5037.13 6386.42 5923.30 -2880.32 -5175.83 0.50 5972174.71 658996.32 N 70.33060650 W 148.71030390 11957.41 89.38 267.09 8920.17 8977.22 5069.38 6418.87 5952.63 -2882.41 -5208.21 4.81 5972171.92 658963.99 N 70.33060073 W 148.71056649 11988.56 89.45 266.76 8920.49 8977.54 5100.37 6450.01 5980.67 -2884.08 -5239.32 1.08 5972169.57 658932.94 N 70.33059611 W 148.71081873 12021.27 89.76 265.83 8920.72 8977.77 5132.88 6482.72 6010.30 -2886.20 -5271.96 3.00 5972166.74 658900.35 N 70.33059027 W 148.71108344 12052.99 92.74 265.66 8920.02 8977.07 5164.36 6514.43 6039.18 -2888.55 -5303.58 9.41 5972163.69 658868.79 N 70.33058378 W 148.71133988 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( do31 rt-546 ) E-37\E-37\E-37 A\E-37 A Generated 3/3/200511 :10 AM Page 5 of 7 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It! (It) ( II) (It) (It) (deg/100 It) (ltUS) (ltUS) 12085.31 93.57 266.44 8918.25 8975.30 5196.41 6546.70 6068.53 -2890.77 -5335.77 3.52 5972160.77 658836.66 N 70.33057764 W 148.71160096 12117.27 94.22 268.54 8916.07 8973.12 5228.17 6578.59 6097.22 -2892.17 -5367.63 6.86 5972158.67 658804.84 N 70.33057377 W 148.71185929 12149.22 92.36 265.89 8914.24 8971.29 5259.92 6610.48 6126.01 -2893.72 -5399.48 10.12 5972156.43 658773.03 N 70.33056947 W 148.71211763 12181.72 91.99 265.82 8913.01 8970.06 5292.17 6642.96 6155.69 -2896.07 -5431.87 1.16 5972153.37 658740.70 N 70.33056299 W 148.71238032 12212.75 91.99 265.74 8911.93 8968.98 5322.96 6673.97 6184.06 -2898.35 -5462.80 0.26 5972150.41 658709.83 N 70.33055670 W 148.71263113 12244.08 91.88 267.96 8910.87 8967.92 5354.11 6705.28 6212.50 -2900.07 -5494.06 7.09 5972148.01 658678.62 N 70.33055193 W 148.71288467 12276.06 91.71 268.04 8909.87 8966.92 5385.96 6737.25 6241.29 -2901.19 -5526.01 0.59 5972146.20 658646.71 N 70.33054882 W 148.71314373 12308.67 92.95 266.57 8908.54 8965.59 5418.40 6769.83 6270.83 -2902.72 -5558.55 5.89 5972143.95 658614.21 N 70.33054457 W 148.71340768 12340.51 95.73 267.70 8906.14 8963.19 5450.00 6801.58 6299.68 -2904.30 -5590.26 9.42 5972141.67 658582.55 N 70.33054017 W 148.71366480 12372.88 96.90 267.88 8902.57 8959.62 5482.06 6833.75 6328.80 -2905.54 -5622.41 3.66 5972139.73 658550.43 N 70.33053672 W 148.71392553 12404.83 97.73 269.82 8898.51 8955.56 5513.68 6865.44 6357.25 -2906.18 -5654.09 6.56 5972138.40 658518.78 N 70.33053491 W 148.71.7 Tie-In Survey 12436.95 97.42 270.27 8894.27 8951.32 5545.49 6897.28 6385.57 -2906.16 -5685.93 1.69 5972137.73 658486.95 N 70.33053491 W 148.71 9 MWD+IFR+MS 12467.17 95.52 270.19 8890.87 8947.92 5575.48 6927.31 6412.27 -2906.04 -5715.96 6.29 5972137.19 658456.93 N 70.33053518 W 148.71 20 12497.82 92.90 269.64 8888.62 8945.67 5606.01 6957.87 6439.55 -2906.08 -5746.52 8.73 5972136.47 658426.37 N 70.33053499 W 148.71493209 12532.07 90.44 267.73 8887.62 8944.67 5640.16 6992.10 6470.46 -2906.87 -5780.74 9.09 5972134.94 658392.18 N 70.33053277 W 148.71520963 12566.29 90.98 270.70 8887.19 8944.24 5674.32 7026.32 6501.25 -2907.34 -5814.95 8.82 5972133.72 658357.99 N 70.33053142 W 148.71548707 12593.47 88.41 269.30 8887.34 8944.39 5701.46 7053.50 6525.57 -2907.34 -5842.13 10.77 5972133.13 658330.82 N 70.33053136 W 148.71570747 12627.03 89.54 266.26 8887.94 8944.99 5734.89 7087.05 6556.18 -2908.64 -5875.66 9.66 5972131.09 658297.33 N 70.33052774 W 148.71597936 12659.76 90.74 267.53 8887.86 8944.91 5767.46 7119.78 6586.27 -2910.41 -5908.34 5.34 5972128.61 658264.70 N 70.33052283 W 148.71624439 12689.70 91.70 267.25 8887.22 8944.27 5797.26 7149.71 6613.70 -2911.77 -5938.24 3.34 5972126.59 658234.84 N 70.33051904 W 148.71648689 12722.86 92.70 268.04 8885.95 8943.00 5830.27 7182.85 6644.04 -2913.13 -5971.34 3.84 5972124.50 658201.77 N 70.33051525 W 148.71675538 12755.08 92.70 268.17 8884.43 8941.48 5862.35 7215.03 6673.43 -2914.20 -6003.51 0.40 5972122.74 658169.64 N 70.33051227 W 148.71701625 12784.37 91.98 268.24 8883.24 8940.29 5891.53 7244.30 6700.16 -2915.11 -6032.76 2.47 5972121.18 658140.42 N 70.33050970 W 148.71725347 12817.83 91.19 269.33 8882.31 8939.36 5924.90 7277.75 6730.59 -2915.82 -6066.20 4.02 5972119.74 658107.01 N 70.33050769 W 148.71752466 12850.02 90.71 269.72 8881.78 8938.83 5957.04 7309.93 6759.72 -2916.09 -6098.38 1.92 5972118.77 658074.84 N 70.33050689 W 148.71778567 12880.68 89.89 270.29 8881.62 8938.67 5987.67 7340.59 6787.40 -2916.09 -6129.04 3.26 5972118.10 658044.19 N 70.33050683 W 148.71803432 12914.11 89.65 271.26 8881.75 8938.80 6021.08 7374.02 6817.40 -2915.64 -6162.47 2.99 5972117.82 658010.76 N 70.33050799 W 148.71830542 12946.80 89.65 270.09 8881.95 8939.00 6053.75 7406.71 6846.80 -2915.25 -6195.16 3.58 5972117.49 657978.08 N 70.33050897 W 148.71857051 12975.61 89.61 270.23 8882.14 8939.19 6082.53 7435.52 6872.84 -2915.17 -6223.97 0.51 5972116.94 657949.27 N 70.33050912 W 148.7.16 13009.35 89.75 271.72 8882.32 8939.37 6116.25 7469.26 6903.16 -2914.60 -6257.70 4.44 5972116.78 657915.54 N 70.33051061 W 148.7 74 13041.95 89.89 272.42 8882.43 8939.48 6148.85 7501.86 6932.22 -2913.42 -6290.28 2.19 5972117.24 657882.94 N 70.33051376 W 148.71934197 Last MWD+IFR+MS 13073.43 89.82 272.57 8882.51 8939.56 6180.33 7533.34 6960.19 -2912.05 -6321.73 0.53 5972117.92 657851.48 N 70.33051743 W 148.71959704 TO ( Projected) 13130.00 89.82 272.57 8882.68 8939.73 6236.90 7589.90 7010.51 -2909.51 -6378.24 0.00 5972119.22 657794.92 N 70.33052423 W 148.72005538 Survey Type: Definitive Survey NOTES: MWD - Standard -- ( Measurement While Drilling with no (or no known) special corrections. The model allows for the fact that axial interference may marginally exceed the upper limit specified when the well is near horizontal east/west. ) MWD + IFR ... MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Leqal Description: Northinq (y) [nUSl Eastinq (X) [ftUSl Surface: 3391 FSL 882 FEL S6 T11 N R14E UM 5975167.41 664107.51 Tie-In: 3391 FSL 881 FEL S6 T11 N R14E UM 5975167.74 664107.66 SurveyEditor Ver 3.1RT-SP3.03-HF5.00 Bld( do31rt-546) E-37IE-37\E-37 AIE-37 A Generated 3/3/2005 11:10 AM Page 6 of 7 Comments I Measured I J . . I . I S S TVD I Depth nclmatron AZimuth ub- ea (It) (deg) (deg) (It) BHL: 478 FSL 2367 FEL S1 T11 N R13E UM SurveyEditor Ver 3.1RT-SP3.03-HF5.00 Bld( d031rt-546) TVD I Verti.car I Along Hole I Closure I SecllOn Departure (It) (It) (It) 5972119.22 657794.92 (It) E-37\E-37IE-37 AIE-37 A NS (It) EW (It) I DLS I (deg/100 It) Northing (ltUS) Easting Latitude Longitude (ftUS) . . Generated 3/3/2005 11:10 AM Page 7 of 7 E-37APB1 Survey Report Schlumberger Report Date: 22-Jan·05 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 272.650' Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 It, E 0.000 It Structure I Slot: E-PAD / E-37 TVD Reference Datum: Rotary Table Well: E-37 TVD Reference Elevation: 57.05 It relative to MSL Borehole: E-37APB1 Sea Bed I Ground Level Elevation: 28.05 It relative to MSL UWVAPI#: 500292257171 Magnetic Declination: 24.940' Survey Name I Date: E-37APB1/ January 22,2005 Total Field Strength: 57631.500 nT Tort I AHD I DDII ERD ratio: 281.878' /7299.90 It /6.468/ 0.811 Magnetic Dip: 80.877' Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: January 21,2005 . Location LatlLong: N 70.33848018, W 148.66832719 Magnetic Declination Model: BGGM 2004 Location Grid NlE Y/X: N 5975167.410 ItUS. E 664107.510 ItUS North Reference: True North Grid Convergence Angle: +1.25405755' Total Corr Mag North -> True North: +24.940' Grid Scale Factor: 0.99993059 Local Coordinates Referenced To: Well Head Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) ( deg) (deg) (It) (It) (It) (It) ( ft) (It) (It) (deg/100 It) (ftUS) (flUS) RTE 0.00 0.01 25.40 -57.05 0.00 -0.14 0.00 0.37 0.33 0.16 0.00 5975167.74 664107.66 N 70.33848109 W 148.66832591 MWD (Standard) 202.95 0.20 25.40 145.90 202.95 -0.28 0.37 0.73 0.66 0.31 0.10 5975168.08 664107.81 N 70.33848199 W 148.66832464 292.46 0.10 323.00 235.41 292.46 -0.29 0.58 0.93 0.87 0.33 0.20 5975168.28 664107.83 N 70.33848255 W 148.66832448 381.30 0.30 30.20 324.25 381.30 -0.35 0.86 1.20 1.13 0.40 0.31 5975168.55 664107.89 N 70.33848327 W 148.66832391 468.31 0.20 316.20 411.26 468.31 -0.35 1.20 1.49 1.43 0.41 0.36 5975168.85 664107.89 N 70.33848410 W 148.66832383 563.27 0.60 9.90 506.22 563.27 -0.29 1.82 2.08 2.04 0.38 0.53 5975169.46 664107.85 N 70.33848577 W 148.66832407 651.62 0.60 355.80 594.56 651.61 -0.29 2.74 2.99 2.96 0.43 0.17 5975170.38 664107.88 N 70.33848827 W 148.66832370 742.18 0.80 314.80 685.11 742.16 0.23 3.80 3.88 3.88 -0.05 0.58 5975171.29 664107.37 N 70.33849078 W 148.66832762 772.14 1.00 318.30 715.07 772.12 0.57 4.27 4.24 4.22 -0.38 0.69 5975171.62 664107.04 N 70.33849172 W 148.66833023 801.67 1.00 301.60 744.60 801.65 0.98 4.78 4.61 4.55 -0.77 0.98 5975171.94 664106.64 N 70.33849261 W 148.66833341 831.87 1.30 268.90 774.79 831.84 1.55 5.37 4.87 4.68 -1.33 2.35 5975172.06 664106.07 N 70.33849297 W 148.6!1r 861.59 2.00 247.60 804.50 861.55 2.35 6.22 4.97 4.48 -2.15 3.09 5975171.84 664105.26 N 70.33849241 W 148.6 3 891.18 2.70 241.10 834.06 891.11 3.42 7.43 5.10 3.94 -3.24 2.53 5975171.28 664104.19 N 70.33849096 W 148.668 5345 920.86 3.50 242.10 863.70 920.75 4.79 9.04 5.63 3.18 -4.65 2.70 5975170.49 664102.79 N 70.33848887 W 148.66836492 950.39 3.80 242.50 893.17 950.22 6.41 10.92 6.72 2.31 -6.31 1.02 5975169.58 664101.15 N 70.33848649 W 148.66837842 979.92 4.20 233.20 922.63 979.68 8.10 12.97 8.14 1.21 -8.05 2.58 5975168.44 664099.44 N 70.33848348 W 148.66839249 1039.14 4.80 222.60 981.67 1038.72 11.36 17.61 11.62 -1.91 -11.46 1.73 5975165.25 664096.09 N 70.33847495 W 148.66842018 1102.83 5.50 222.20 1045.10 1102.15 15.02 23.32 16.50 -6.14 -15.32 1.10 5975160.94 664092.33 N 70.33846342 W 148.66845145 1198.46 5.90 217.80 1140.26 1197.31 20.76 32.82 25.26 -13.42 -21.41 0.62 5975153.53 664086.40 N 70.33844353 W 148.66850087 1294.24 6.30 208.60 1235.50 1292.55 25.90 42.97 34.73 -21.92 -26.94 1.10 5975144.91 664081.06 N 70.33842030 W 148.66854576 1388.81 6.50 203.40 1329.48 1386.53 30.06 53.51 44.50 -31.39 -31.55 0.65 5975135.34 664076.66 N 70.33839443 W 148.66858316 1483.81 6.80 203.50 1423.84 1480.89 33.97 64.51 54.88 -41 .48 -35.93 0.32 5975125.16 664072.50 N 70.33836686 W 148.66861868 1578.34 7.20 203.30 1517.66 1574.71 38.05 76.03 65.95 -52.05 -40.50 0.42 5975114.49 664068.16 N 70.33833798 W 148.66865579 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) E-37\E-37\E-37 APB 1 \E-37 APB 1 Generated 3/3/200511 :10 AM Page 1 of 6 Commenls Measured I Inclination I Azimulh I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easling Lalilude Longilude Deplh Seclion Departure (II) (deg) (deg) (II) (II) (II) ( II) (II) (II) (II) (deg/100 II) (IIUS) (IIUS) 1672.98 6.70 203.40 1611.61 1668.66 42.10 87.48 77.09 -62.57 -45.04 0.53 5975103.88 664063.85 N 70.33830925 W 148.66869262 1767.25 8.10 203.90 1705.09 1762.14 46.46 99.62 89.00 -73.69 -49.92 1.49 5975092.65 664059.22 N 70.33827888 W 148.66873217 1862.93 9.50 209.30 1799.64 1856.69 52.44 114.25 103.52 -86.74 -56.51 1.70 5975079.46 664052.91 N 70.33824323 W 148.66878568 1925.49 10.20 211.10 1861.28 1918.33 57.40 124.95 114.21 -95.98 -61.90 1.22 5975070.10 664047.73 N 70.33821797 W 148.66882939 2020.81 10.30 212.10 1955.08 2012.13 65.61 141.91 131.17 -110.43 -70.79 0.21 5975055.47 664039.16 N 70.33817850 W 148.66890149 2116.93 10.60 204.30 2049.61 2106.66 73.09 159.32 148.51 -125.77 -78.99 1.50 5975039.95 664031.29 N 70.33813660 W 148.66896806 2211.02 12.40 199.40 2141.81 2198.86 79.20 178.07 166.98 -143.18 -85.91 2.18 5975022.39 664024.76 N 70.33808902 W 148.66902418 2306.11 14.30 202.40 2234.33 2291.38 86.11 200.02 188.63 -163.67 -93.78 2.13 5975001.74 664017.34 N 70.33803304 W 148.66908801 2399.27 16.10 206.70 2324.23 2381.28 95.26 224.43 212.96 -185.85 -103.97 2.28 5974979.34 664007.64 N 70.33797245 W 148.66917067 2494.11 16.80 208.80 2415.18 2472.23 106.66 251.28 239.80 -209.61 -116.48 0.97 5974955.31 663995.66 N 70.33790754 W 148.66927218 2590.20 18.10 211.60 2506.85 2563.90 120.01 280.09 268.60 -234.50 -130.99 1.61 5974930.12 663981.69 N 70.33783956 W 148.66. 2685.03 20.30 216.30 2596.41 2653.46 136.26 311.26 299.66 -260.30 -148.45 2.83 5974903.94 663964.80 N 70.33776905 W 148.66 2778.67 22.10 220.90 2683.71 2740.76 156.17 345.11 333.12 -286.71 -169.60 2.62 5974877.07 663944.23 N 70.33769690 W 148.66970317 2872.59 24.20 219.10 2770.07 2827.12 178.54 382.03 369.60 -315.01 -193.31 2.36 5974848.27 663921.15 N 70.33761960 W 148.66989553 2966.01 25.90 217.70 2854.70 2911.75 201.64 421.58 408.89 -346.01 -217.87 1.93 5974816.73 663897.28 N 70.33753489 W 148.67009473 3060.72 26.60 216.70 2939.64 2996.69 225.39 463.47 450.64 -379.38 -243.19 0.87 5974782.82 663872.70 N 70.33744373 W 148.67030016 3156.09 27.90 219.70 3024.43 3081 .48 250.79 507.12 494.10 -413.67 -270.21 1.98 5974747.95 663846.44 N 70.33735005 W 148.67051932 3250.87 29.60 222.60 3107.52 3164.57 279.19 552.70 539.27 -447.97 -300.22 2.32 5974713.01 663817.19 N 70.33725636 W 148.67076279 3345.63 31.70 223.90 3189.04 3246.09 310.63 601.01 586.97 -483.14 -333.33 2.32 5974677.13 663784.86 N 70.33716027 W 148.67103138 3441.18 34.10 226.40 3269.27 3326.32 345.71 652.90 638.04 -519.71 -370.14 2.89 5974639.77 663748.86 N 70.33706037 W 148.67133001 3534.56 34.50 227.80 3346.41 3403.46 382.57 705.52 689.66 -555.52 -408.69 0.95 5974603.12 663711.11 N 70.33696251 W 148.67164272 3629.71 35.90 229.40 3424.16 3481.21 421.99 760.36 743.34 -591.78 -449.83 1.76 5974565.97 663670.77 N 70.33686345 W 148.67197651 3720.16 37.60 231.60 3496.63 3553.68 462.12 814.47 796.10 -626.18 -491.60 2.38 5974530.66 663629.77 N 70.33676946 W 148.67231531 3921.06 38.60 231 .40 3654.73 3711.78 555.46 938.44 917.15 -703.35 -588.61 0.50 5974451.40 663534.48 N 70.33655863 W 148.67310227 4016.08 38.60 230.90 3728.99 3786.04 599.86 997.72 975.36 -740.54 -634.78 0.33 5974413.21 663489.14 N 70.33645703 W 148.67347677 4105.76 35.30 232.00 3800.65 3857.70 640.40 1051.62 1028.35 -774.14 -676.92 3.75 5974378.69 663447.75 N 70.33636521 W 148.67381861 4201.31 34.00 229.00 3879.25 3936.30 680.68 1105.93 1081.98 -808.67 -718.84 2.24 5974343.26 663406.59 N 70.33627087 W 148.67415867 4297.13 35.20 230.70 3958.13 4015.18 720.61 1160.34 1135.85 -843.74 -760.43 1.61 5974307.29 663365.78 N 70.33617505 W 148.6.6 4396.44 35.60 229.30 4039.08 4096.13 762.92 1217.87 1192.85 -880.72 -804.50 0.91 5974269.36 663322.54 N 70.33607402 W 148.6 9 4488.62 35.40 230.10 4114.12 4171.17 802.09 1271.39 1245.96 -915.34 -845.32 0.55 5974233.85 663282.49 N 70.33597942 W 148.6 63 4583.76 36.40 228.60 4191.19 4248.24 842.69 1327.18 1301.39 -951.69 -887.64 1.40 5974196.59 663240.98 N 70.33588011 W 148.67552789 4676.87 36.40 228.10 4266.14 4323.19 882.23 1382.43 1356.41 -988.41 -928.92 0.32 5974158.98 663200.51 N 70.33577978 W 148.67586277 4771.98 36.10 229.50 4342.84 4399.89 922.78 1438.67 1412.39 -1025.45 -971.23 0.93 5974121.02 663159.02 N 70.33567857 W 148.67620597 4867.55 36.00 228.80 4420.11 4477.16 963.58 1494.91 1468.36 -1062.24 -1013.78 0.44 5974083.32 663117.30 N 70.33557806 W 148.67655104 4963.25 36.00 229.70 4497.53 4554.58 1004.45 1551.16 1524.36 -1098.95 -1056.39 0.55 5974045.68 663075.50 N 70.33547773 W 148.67689667 5057.11 36.00 230.20 4573.47 4630.52 1044.99 1606.33 1579.22 -1134.45 -1098.62 0.31 5974009.27 663034.06 N 70.33538073 W 148.67723921 5149.28 36.60 230.20 4647.75 4704.80 1085.26 1660.90 1633.49 -1169.38 -1140.54 0.65 5973973.43 662992.91 N 70.33528530 W 148.67757924 5246.85 36.90 228.80 4725.93 4782.98 1127.84 1719.27 1691.63 -1207.30 -1184.93 0.91 5973934.56 662949.37 N 70.33518170 W 148.67793926 5341.34 36.80 228.30 4801.54 4858.59 1168.54 1775.94 1748.16 -1244.81 -1227.40 0.33 5973896.13 662907.73 N 70.33507920 W 148.67828376 5436.49 36.60 229.30 4877.83 4934.88 1209.54 1832.80 1804.87 -1282.26 -1270.19 0.66 5973857.75 662865.78 N 70.33497686 W 148.67863076 5531.11 36.50 228.60 4953.84 5010.89 1250.28 1889.15 1861.07 -1319.27 -1312.68 0.45 5973819.83 662824.11 N 70.33487575 W 148.67897542 SurveyEdilor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) E-37\E -37\E-37 APB 1 \E-37 APB1 Generated 3/3/2005 11: 1 0 AM Page 2 of 6 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (It) (It) (It) ( deg/100 It) (ltUS) (ltUS) 5627.43 37.30 230.00 5030.87 5087.92 1292.34 1946.98 1918.73 -1356.97 -1356.53 1.20 5973781.17 662781.10 N 70.33477272 W 148.67933103 5722.25 36.70 230.20 5106.59 5163.64 1334.37 2004.05 1975.58 -1393.58 -1400.30 0.65 5973743.62 662738.14 N 70.33467270 W 148.67968609 5816.88 36.80 229.50 5182.42 5239.47 1375.92 2060.66 2032.01 -1430.08 -1443.58 0.46 5973706.18 662695.67 N 70.33457294 W 148.68003708 5911.92 36.80 230.60 5258.52 5315.57 1417.82 2117.59 2088.75 -1466.64 -1487.22 0.69 5973668.68 662652.85 N 70.33447305 W 148.68039103 6007.69 36.30 229.70 5335.45 5392.50 1459.87 2174.63 2145.59 -1503.18 -1531.01 0.77 5973631.19 662609.87 N 70.33437319 W 148.68074615 6103.39 36.40 232.30 5412.54 5469.59 1502.25 2231.34 2202.05 -1538.87 -1575.08 1.61 5973594.55 662566.59 N 70.33427567 W 148.68110360 6197.53 37.10 234.10 5487.97 5545.02 1545.74 2287.67 2257.89 -1572.60 -1620.19 1.36 5973559.84 662522.24 N 70.33418349 W 148.68146939 6293.94 37.10 232.70 5564.87 5621.92 1590.78 2345.82 2315.55 -1607.27 -1666.87 0.88 5973524.16 662476.33 N 70.33408874 W 148.68184802 6388.96 37.20 232.50 5640.60 5697.65 1634.70 2403.20 2372.57 -1642.13 -1712.46 0.17 5973488.32 662431.52 N 70.33399350 W 148.68221773 6483.23 37.30 230.70 5715.64 5772.69 1677. 73 2460.26 2429.38 -1677.57 -1757.17 1.16 5973451.91 662387.60 N 70.33389665 W 148.68258035 6571.90 37.30 233.20 5786.18 5843.23 1718.46 2513.99 2482.85 -1710.68 -1799.48 1.71 5973417.88 662346.03 N 70.33380616 W 148.6~.5 6673.80 37.70 231.10 5867.03 5924.08 1765.62 2576.02 2544.57 -1748.74 -1848.45 1.31 5973378.76 662297.91 N 70.33370215 W 148.68 61 6767.59 37.80 231.00 5941.19 5998.24 1808.56 2633.44 2601.82 -1784.84 -1893.10 0.13 5973341.70 662254.05 N 70.33360351 W 148.68368275 6862.91 38.00 230.80 6016.40 6073.45 1852.24 2691.99 2660.22 -1821.77 -1938.54 0.25 5973303.79 662209.44 N 70.33350259 W 148.68405125 6957.03 36.80 231.00 6091.17 6148.22 1894.89 2749.16 2717.24 -1857.82 -1982.91 1.28 5973266.77 662165.88 N 70.33340406 W 148.68441101 7052.26 37.30 230.90 6167.17 6224.22 1937.73 2806.53 2774.48 -1893.97 -2027.46 0.53 5973229.66 662122.12 N 70.33330528 W 148.68477235 7148.27 37.50 231.90 6243.45 6300.50 1981.57 2864.85 2832.62 -1930.35 -2073.04 0.67 5973192.30 662077.36 N 70.33320586 W 148.68514192 7242.85 37.60 231.60 6318.43 6375.48 2025.14 2922.49 2890.07 -1966.03 -2118.30 0.22 5973155.63 662032.89 N 70.33310833 W 148.68550901 7338.47 37.50 230.90 6394.24 6451.29 2068.85 2980.76 2948.20 -2002.51 -2163.75 0.46 5973118.17 661988.25 N 70.33300865 W 148.68587756 7433.61 37.10 230.60 6469.92 6526.97 2111.77 3038.42 3005.74 -2038.99 -2208.40 0.46 5973080.73 661944.42 N 70.33290896 W 148.68623961 7529.41 36.90 231.30 6546.43 6603.48 2154.81 3096.07 3063.28 -2075.31 -2253.17 0.49 5973043.44 661900.45 N 70.33280970 W 148.68660267 7625.12 36.70 230.40 6623.07 6680.12 2197.55 3153.40 3120.51 -2111.50 -2297.63 0.60 5973006.28 661856.80 N 70.33271078 W 148.68696320 7719.12 36.60 231.60 6698.49 6755.54 2239.48 3209.51 3176.51 -2146.81 -2341 .24 0.77 5972970.03 661813.98 N 70.33261427 W 148.68731678 7812.80 36.60 231.30 6773.70 6830.75 2281.50 3265.37 3232.23 -2181.62 -2384.92 0.19 5972934.27 661771.08 N 70.33251914 W 148.68767099 7906.65 36.40 231.30 6849.14 6906.19 2323.41 3321.19 3287.94 -2216.53 -2428.49 0.21 5972898.43 661728.29 N 70.33242375 W 148.68802427 8001.38 36.20 231.10 6925.48 6982.53 2365.44 3377.27 3343.91 -2251.67 -2472.19 0.25 5972862.34 661685.36 N 70.33232771 W 148.68837867 8092.55 37.10 229.50 6998.63 7055.68 2405.65 3431.69 3398.27 -2286.43 -2514.06 1.44 5972826.67 661644.27 N 70.33223269 W 148.68871812 8187.92 37.80 231.10 7074.34 7131.39 2448.51 3489.68 3456.20 -2323.47 -2558.67 1.26 5972788.67 661600.48 N 70.33213148 W 148..91 8282.42 37.70 230.70 7149.06 7206.11 2491.68 3547.53 3513.97 -2359.95 -2603.57 0.28 5972751.21 661556.39 N 70.33203175 W 148. 96 8374.17 37.30 231.30 7221.85 7278.90 2533.41 3603.39 3569.74 -2395.10 -2646.98 0.59 5972715.12 661513.77 N 70.33193568 W 148.6 91 8470.39 36.40 230.00 7298.85 7355.90 2576.30 3661.09 3627.37 -2431.69 -2691.60 1.24 5972677.58 661469.96 N 70.33183570 W 148.69015774 8564.53 35.70 230.40 7374.96 7432.01 2617.17 3716.49 3682.73 -2467.15 -2734.16 0.78 5972641.19 661428.19 N 70.33173878 W 148.69050283 8658.36 35.80 230.70 7451.11 7508.16 2657.85 3771.31 3737.49 -2501.98 -2776.49 0.22 5972605.44 661386.63 N 70.33164358 W 148.69084606 8752.03 36.10 231.10 7526.94 7583.99 2698.87 3826.30 3792.41 -2536.66 -2819.17 0.41 5972569.84 661344.73 N 70.33154879 W 148.69119208 8845.85 37.30 229.70 7602.17 7659.22 2740.37 3882.37 3848.43 -2572.41 -2862.36 1.56 5972533.16 661302.33 N 70.33145109 W 148.69154228 8939.07 37.30 230.70 7676.32 7733.37 2782.05 3938.86 3904.88 -2608.57 -2905.76 0.65 5972496.06 661259.74 N 70.33135226 W 148.69189416 9033.75 36.20 232.70 7752.18 7809.23 2824.82 3995.50 3961.41 -2643.68 -2950.21 1.72 5972459.99 661216.08 N 70.33125628 W 148.69225450 9128.16 36.00 232.80 7828.47 7885.52 2867.50 4051.13 4016.86 -2677.35 -2994.48 0.22 5972425.36 661172.55 N 70.33116425 W 148.69261351 9219.73 35.60 233.90 7902.74 7959.79 2908.94 4104.69 4070.21 -2709.33 -3037.46 0.83 5972392.45 661130.29 N 70.33107685 W 148.69296192 9315.68 36.60 232.50 7980.26 8037.31 2952.59 4161.22 4126.53 -2743.20 -3082.72 1.35 5972357.60 661085.78 N 70.33098427 W 148.69332888 9344.85 37.10 231.80 8003.61 8060.66 2965.89 4178.72 4143.99 -2753.93 -3096.53 2.24 5972346.57 661072.21 N 70.33095493 W 148.69344087 SurveyEditor Ver 3.1RT-SP3.03-HF5.00 Bld( d031rt-546) E-37\E-37\E-37 APB 1 \E-37 APB 1 Generated 3/3/2005 11: 1 0 AM Page 3 of 6 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) (II) (It) ( It) (II) (II) (II) (deg/100 II) (IIUS) (ftUS) 9407.55 37.80 232.00 8053.38 8110.43 2994.77 4216.84 4182.04 -2777.46 -3126.53 1.13 5972322.40 661042.73 N 70.33089063 W 148.69368411 9502.64 37.70 230.40 8128.57 8185.62 3038.41 4275.06 4240.18 -2813.93 -3171.90 1.04 5972284.94 660998.18 N 70.33079093 W 148.69405193 9596.86 37.20 231.30 8203.37 8260.42 3081.11 4332.35 4297.42 -2850.10 -3216.33 0.79 5972247.81 660954.56 N 70.33069206 W 148.69441212 9688.41 36.50 231.80 8276.63 8333.68 3122.49 4387.25 4352.25 -2884.25 -3259.32 0.83 5972212.73 660912.32 N 70.33059873 W 148.69476071 9718.70 36.20 232.70 8301.02 8358.07 3136.16 4405.20 4370.16 -2895.24 -3273.52 2.02 5972201.44 660898.37 N 70.33056869 W 148.69487579 9758.35 35.19 234.31 8333.23 8390.28 3154.09 4428.34 4393.21 -2909.00 -3292.11 3.48 5972187.27 660880.08 N 70.33053107 W 148.69502654 9790.66 36.01 234.98 8359.50 8416.55 3168.92 4447.14 4411.91 -2919.88 -3307.45 2.81 5972176.06 660864.99 N 70.33050132 W 148.69515091 9821.74 38.89 237.72 8384.17 8441.22 3184.15 4466.04 4430.63 -2930.34 -3323.19 10.70 5972165.26 660849.48 N 70.33047274 W 148.69527849 9854.93 42.39 238.78 8409.35 8466.40 3201.99 4487.65 4451.93 -2941.70 -3341.57 10.75 5972153.49 660831.36 N 70.33044166 W 148.69542753 9886.47 44.85 239.43 8432.18 8489.23 3220.12 4509.41 4473.33 -2952.87 -3360.24 7.93 5972141.92 660812.94 N 70.33041113 W 148.69557891 9916.46 45.35 239.82 8453.35 8510.40 3237.93 4530.65 4494.19 -2963.61 -3378.57 1.90 5972130.78 660794.85 N 70.33038176 W 148.6.0 9948.67 46.17 240.59 8475.82 8532.87 3257.41 4553.73 4516.81 -2975.08 -3398.59 3.07 5972118.88 660775.08 N 70.33035041 W 148.69 87 9977.91 48.55 241.71 8495.63 8552.68 3275.75 4575.24 4537.82 -2985.45 -3417.43 8.61 5972108.10 660756.47 N 70.33032205 W 148.69604263 10009.05 49.96 243.37 8515.95 8573.00 3296.16 4598.83 4560.74 -2996.33 -3438.37 6.07 5972096.77 660735.78 N 70.33029231 W 148.69621236 10041.09 50.76 243.51 8536.39 8593.44 3317.69 4623.50 4584.63 -3007.36 -3460.44 2.52 5972085.26 660713.96 N 70.33026215 W 148.69639130 10072.77 50.82 244.02 8556.42 8613.47 3339.18 4648.05 4608.37 -3018.21 -3482.45 1.26 5972073.93 660692.19 N 70.33023248 W 148.69656983 10104.20 50.98 243.13 8576.24 8633.29 3360.50 4672.44 4631.99 -3029.07 -3504.30 2.26 5972062.60 660670.59 N 70.33020279 W 148.69674693 10130.42 50.87 243.55 8592.77 8649.82 3378.25 4692.79 4651.73 -3038.20 -3522.49 1.31 5972053.07 660652.61 N 70.33017782 W 148.69689442 10162.59 50.97 243.81 8613.05 8670.10 3400.10 4717.76 4675.91 -3049.27 -3544.87 0.70 5972041.51 660630.47 N 70.33014754 W 148.69707590 MWD (Standard) 10192.49 51.25 243.93 8631.82 8688.87 3420.50 4741.04 4698.44 -3059.52 -3565.77 0.99 5972030.81 660609.81 N 70.33011951 W 148.69724532 Tie-In Survey 10192.49 51.25 243.93 8631.82 8688.87 3420.50 4741.04 4698.44 -3059.52 -3565.77 0.00 5972030.81 660609.81 N 70.33011951 W 148.69724532 Top Window 10215.00 51.04 243.59 8645.95 8703.00 3435.84 4758.57 4715.42 -3067.27 -3581.49 1.50 5972022.72 660594.26 N 70.33009832 W 148.69737280 Base Window 10227.00 51.40 246.00 8653.46 8710.51 3444.11 4767.92 4724.44 -3071.25 -3589.95 15.94 5972018.55 660585.89 N 70.33008743 W 148.69744142 Blind Projection 10233.00 51.40 246.00 8657.21 8714.26 3448.30 4772.61 4728.94 -3073.16 -3594.24 0.00 5972016.55 660581.65 N 70.33008221 W 148.69747615 Blind ( Inc Only) 10249.62 51.95 248.82 8667.51 8724.56 3460.10 4785.65 4741.34 -3078.17 -3606.27 13.72 5972011.28 660569.72 N 70.33006852 W 148.69757375 10276.79 51.11 253.49 8684.42 8741.47 3479.88 4806.91 4761.11 -3085.04 -3626.39 13.81 5972003.97 660549.76 N 70.33004972 W 148.69773690 Last Blind ( Inc Only) 10310.85 50.70 259.38 8705.91 8762.96 3505.24 4833.34 4784.70 -3091.24 -3652.07 13.47 5971997.21 660524.23 N 70.33003275 W 148.69794509 First MWD+IFR+MS 1 0344.45 50.61 263.27 8727.22 8784.27 3530.71 4859.32 4806.85 -3095.16 -3677.75 8.96 5971992.73 660498.64 N 70.33002201 W 148..3 10373.43 51.45 267.67 8745.45 8802.50 3553.05 4881.85 4825.19 -3096.93 -3700.20 12.15 5971990.47 660476.24 N 70.33001713 W 148. 9 10407.11 53.22 273.76 8766.04 8823.09 3579.68 4908.50 4845.42 -3096.58 -3726.83 15.24 5971990.23 660449.60 N 70.33001805 W 148.6 41 10437.63 54.69 278.78 8784.01 8841.06 3604.29 4933.17 4862.58 -3093.88 -3751.35 14.14 5971992.40 660425.04 N 70.33002540 W 148.69875023 10469.20 55.98 285.45 8801.98 8859.03 3629.88 4959.12 4878.72 -3088.42 -3776.71 17.85 5971997.30 660399.56 N 70.33004027 W 148.69895593 10505.54 59.48 290.21 8821.38 8878.43 3659.51 4989.84 4895.44 -3079.00 -3805.93 14.67 5972006.08 660370.14 N 70.33006599 W 148.69919299 10539.26 61.57 292.21 8837.98 8895.03 3687.33 5019.19 4910.10 -3068.37 -3833.29 8.07 5972016.10 660342.56 N 70.33009497 W 148.69941493 10564.85 63.04 289.36 8849.87 8906.92 3708.86 5041.85 4921.65 -3060.34 -3854.48 11.41 5972023.67 660321.21 N 70.33011689 W 148.69958674 10600.08 66.65 290.18 8864.84 8921.89 3739.33 5073.73 4938.51 -3049.55 -3884.48 10.46 5972033.80 660290.98 N 70.33014632 W 148.69983011 10633.17 70.26 286.64 8877.00 8934.05 3768.94 5104.51 4955.55 -3039.84 -3913.67 14.76 5972042.86 660261.58 N 70.33017280 W 148.70006693 10663.01 73.46 283.96 8886.29 8943.34 3796.61 5132.86 4972.62 -3032.37 -3941. 02 13.70 5972049.74 660234.07 N 70.33019318 W 148.70028874 10715.06 74.66 288.12 8900.59 8957.64 3845.28 5182.90 5002.45 -3018.54 -3989.11 8.02 5972062.51 660185.70 N 70.33023089 W 148.70067877 10748.56 75.69 287.51 8909.16 8966.21 3876.54 5215.29 5021.13 -3008.63 -4019.94 3.54 5972071.74 660154.66 N 70.33025791 W 148.70092886 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) E-37\E-37\E-37 APB 1 \E-37 APB 1 Generated 3/3/2005 11: 1 0 AM Page 4 of 6 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (It) (deg) (deg) (It) (It) (It) (It) (It) (It) (It) (deg/100 It) (ltUS) (ltUS) 10777.68 75.62 284.95 8916.37 8973.42 3903.96 5243.50 5038.14 -3000.75 -4047.02 8.52 5972079.03 660127.41 N 70.33027941 W 148.70114856 10811.17 75.65 287.01 8924.68 8981.73 3935.52 5275.94 5057.94 -2991 .82 -4078.21 5.96 5972087.28 660096.04 N 70.33030376 W 148.70140153 10843.05 76.64 285.01 8932.32 8989.37 3965.64 5306.90 5076.94 -2983.28 -4107.96 6.84 5972095.16 660066.11 N 70.33032704 W 148.70164284 10874.15 79.41 284.80 8938.77 8995.82 3995.37 5337.32 5096.18 -2975.46 -4137.36 8.93 5972102.34 660036.55 N 70.33034837 W 148.70188129 10905.55 82.43 283.28 8943.73 9000.78 4025.76 5368.32 5116.26 -2967.94 -4167.43 10.74 5972109.20 660006.32 N 70.33036887 W 148.70212524 10939.38 85.43 282.01 8947.30 9004.35 4058.88 5401.96 5138.79 -2960.57 -4200.25 9.62 5972115.84 659973.35 N 70.33038893 W 148.70239144 10969.20 87.87 282.76 8949.05 9006.10 4088.22 5431.72 5158.92 -2954.19 -4229.33 8.56 5972121.58 659944.15 N 70.33040633 W 148.70262727 11001.73 90.48 280.09 8949.51 9006.56 4120.36 5464.25 5181.42 -2947.75 -4261.21 11.48 5972127.33 659912.14 N 70.33042387 W 148.70288582 11036.33 92.95 279.02 8948.48 9005.53 4154.69 5498.83 5206.25 -2942.01 -4295.31 7.78 5972132.32 659877.92 N 70.33043950 W 148.70316241 11063.42 95.15 278.79 8946.57 9003.62 4181.55 5525.85 5225.95 -2937.82 -4322.00 8.17 5972135.92 659851.14 N 70.33045089 W 148.70337892 11096.83 95.46 278.67 8943.48 9000.53 4214.63 5559.12 5250.35 -2932.78 -4354.88 0.99 5972140.24 659818.16 N 70.33046463 W 148.7.2 11128.51 93.95 279.68 8940.88 8997.93 4246.00 5590.69 5273.43 -2927.74 -4386.05 5.73 5972144.59 659786.89 N 70.33047833 W 148.7 2 11159.30 91.54 281.39 8939.40 8996.45 4276.46 5621.44 5295.50 -2922.12 -4416.28 9.59 5972149.55 659756.55 N 70.33049365 W 148.70 63 11192.33 90.68 281.00 8938.76 8995.81 4309.12 5654.46 5319.03 -2915.71 -4448.68 2.86 5972155.25 659724.02 N 70.33051111 W 148.70440639 11224.77 90.20 279.58 8938.51 8995.56 4341.26 5686.90 5342.59 -2909.91 -4480.60 4.62 5972160.35 659691.99 N 70.33052689 W 148.70466526 11254.65 90.10 279.81 8938.44 8995.49 4370.92 5716.78 5364.59 -2904.88 -4510.05 0.84 5972164.73 659662.43 N 70.33054059 W 148.70490416 11288.80 90.41 279.18 8938.28 8995.33 4404.83 5750.93 5389.91 -2899.25 -4543.73 2.06 5972169.63 659628.64 N 70.33055592 W 148.70517735 11321.51 92.57 279.11 8937.43 8994.48 4437.31 5783.63 5414.37 -2894.05 -4576.01 6.61 5972174.12 659596.26 N 70.33057006 W 148.70543918 11351.14 94.49 278.63 8935.61 8992.66 4466.71 5813.20 5436.66 -2889.49 -4605.23 6.68 5972178.04 659566.95 N 70.33058247 W 148.70567617 11383.51 95.49 278.91 8932.79 8989.84 4498.77 5845.45 5461.09 -2884.57 -4637.10 3.21 5972182.25 659534.98 N 70.33059585 W 148.70593466 11416.77 95.46 278.61 8929.62 8986.67 4531.69 5878.56 5486.25 -2879.53 -4669.82 0.90 5972186.58 659502.16 N 70.33060957 W 148.70620006 11446.31 94.87 277.13 8926.96 8984.01 4560.99 5907.98 5508.97 -2875.50 -4698.96 5.37 5972189.97 659472.94 N 70.33062052 W 148.70643643 11479.90 92.61 277.86 8924.77 8981.82 4594.39 5941.49 5535.08 -2871.13 -4732.19 7.07 5972193.61 659439.62 N 70.33063241 W 148.70670596 11511.85 92.23 276.76 8923.42 8980.47 4626.20 5973.41 5560.07 -2867.07 -4763.85 3.64 5972196.98 659407.88 N 70.33064345 W 148.70696275 11542.63 92.50 274.48 8922.15 8979.20 4656.91 6004.17 5584.77 -2864.06 -4794.46 7.45 5972199.32 659377.22 N 70.33065163 W 148.70721097 11577.77 92.26 271.90 8920.69 8977.74 4692.02 6039.28 5613.90 -2862.10 -4829.51 7.37 5972200.51 659342.14 N 70.33065690 W 148.70749526 11606.87 92.40 270.84 8919.51 8976.56 4721.09 6068.35 5638.57 -2861.41 -4858.58 3.67 5972200.56 659313.06 N 70.33065875 W 148.70773101 11638.04 90.89 271.10 8918.61 8975.66 4752.23 6099.51 5665.17 -2860.88 -4889.73 4.92 5972200.41 659281.91 N 70.33066014 W 148.70798366 11669.69 90.31 269.16 8918.28 8975.33 4783.85 6131.16 5692.47 -2860.81 -4921.38 6.40 5972199.79 659250.27 N 70.33066027 W 148.7.2 11702.05 90.51 267.53 8918.05 8975.10 4816.11 6163.52 5720.92 -2861.74 -4953.72 5.07 5972198.15 659217.96 N 70.33065766 W 148.7 3 11734.32 89.55 264.76 8918.03 8975.08 4848.17 6195.79 5749.90 -2863.91 -4985.92 9.08 5972195.27 659185.82 N 70.33065168 W 148.70876371 11766.19 89.17 264.44 8918.39 8975.44 4879.73 6227.65 5778.92 -2866.91 -5017.64 1.56 5972191.58 659154.17 N 70.33064343 W 148.70902101 11798.42 89.41 264.98 8918.79 8975.84 4911.64 6259.88 5808.27 -2869.88 -5049.73 1.83 5972187.91 659122.15 N 70.33063525 W 148.70928124 11829.43 89.52 265.00 8919.08 8976.13 4942.38 6290.89 5836.48 -2872.59 -5080.62 0.36 5972184.53 659091.33 N 70.33062780 W 148.70953175 11861.25 89.59 265.16 8919.33 8976.38 4973.92 6322.71 5865.43 -2875.32 -5112.32 0.55 5972181.10 659059.70 N 70.33062028 W 148.70978884 11893.61 89.55 265.65 8919.57 8976.62 5006.02 6355.07 5894.84 -2877.91 -5144.58 1.52 5972177.81 659027.51 N 70.33061314 W 148.71005042 11924.96 89.45 265.53 8919.84 8976.89 5037.13 6386.42 5923.30 -2880.32 -5175.83 0.50 5972174.71 658996.32 N 70.33060650 W 148.71030390 11957.41 89.38 267.09 8920.17 8977.22 5069.38 6418.87 5952.63 -2882.41 -5208.21 4.81 5972171.92 658963.99 N 70.33060073 W 148.71056649 11988.56 89.45 266.76 8920.49 8977.54 5100.37 6450.01 5980.67 -2884.08 -5239.32 1.08 5972169.57 658932.94 N 70.33059611 W 148.71081873 12021.27 89.76 265.83 8920.72 8977.77 5132.88 6482.72 6010.30 -2886.20 -5271.96 3.00 5972166.74 658900.35 N 70.33059027 W 148.71108344 12052.99 92.74 265.66 8920.02 8977.07 5164.36 6514.43 6039.18 -2888.55 -5303.58 9.41 5972163.69 658868.79 N 70.33058378 W 148.71133988 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) E-37\E-37\E-37 APB1 \E-37 APB 1 Generated 3/3/2005 11:10 AM Page 5 of 6 Comments Measured I Inclination I Azimuth I Sub-Sea TVD I TVD Vertical I Along Hole I Closure I NS EW I DLS I Northing Easting Latitude Longitude Depth Section Departure (II) (deg) (deg) (II) (II) (II) ( It) (II) (II) (II) (deg/100 II) (IIUS) (IIUS) 12085.31 93.57 266.44 8918.25 8975.30 5196.41 6546.70 6068.53 -2890.77 -5335.77 3.52 5972160.77 658836.66 N 70.33057764 W 148.71160096 12117.27 94.22 268.54 8916.07 8973.12 5228.17 6578.59 6097.22 -2892.17 -5367.63 6.86 5972158.67 658804.84 N 70.33057377 W 148.71185929 12149.22 92.36 265.89 8914.24 8971.29 5259.92 6610.48 6126.01 -2893.72 -5399.48 10.12 5972156.43 658773.03 N 70.33056947 W 148.71211763 12181.72 91.99 265.82 8913.01 8970.06 5292.17 6642.96 6155.69 -2896.07 -5431.87 1.16 5972153.37 658740.70 N 70.33056299 W 148.71238032 12212.75 91.99 265.74 8911.93 8968.98 5322.96 6673.97 6184.06 -2898.35 -5462.80 0.26 5972150.41 658709.83 N 70.33055670 W 148.71263113 12244.08 91.88 267.96 8910.87 8967.92 5354.11 6705.28 6212.50 -2900.07 -5494.06 7.09 5972148.01 658678.62 N 70.33055193 W 148.71288467 12276.06 91.71 268.04 8909.87 8966.92 5385.96 6737.25 6241 .29 -2901.19 -5526.01 0.59 5972146.20 658646.71 N 70.33054882 W 148.71314373 12308.67 92.95 266.57 8908.54 8965.59 5418.40 6769.83 6270.83 -2902.72 -5558.55 5.89 5972143.95 658614.21 N 70.33054457 W 148.71340768 12340.51 95.73 267.70 8906.14 8963.19 5450.00 6801.58 6299.68 -2904.30 -5590.26 9.42 5972141.67 658582.55 N 70.33054017 W 148.71366480 12372.88 96.90 267.88 8902.57 8959.62 5482.06 6833.75 6328.80 -2905.54 -5622.41 3.66 5972139.73 658550.43 N 70.33053672 W 148.71392553 12404.83 97.73 269.82 8898.51 8955.56 5513.68 6865.44 6357.25 -2906.18 -5654.09 6.56 5972138.40 658518.78 N 70.33053491 W 148.71.7 12436.95 97.42 270.27 8894.27 8951.32 5545.49 6897.28 6385.57 -2906.16 -5685.93 1.69 5972137.73 658486.95 N 70.33053491 W 148.71 9 12468.70 97.36 268.46 8890.19 8947.24 5576.92 6928.77 6413.78 -2906.51 -5717.41 5.66 5972136.69 658455.48 N 70.33053390 W 148.714 02 12498.20 97.11 268.20 8886.47 8943.52 5606.10 6958.03 6440.26 -2907.36 -5746.67 1.22 5972135.20 658426.26 N 70.33053150 W 148.71493325 12531.36 97.88 269.22 8882.15 8939.20 5638.90 6990.91 6469.93 -2908.10 -5779.53 3.83 5972133.74 658393.41 N 70.33052941 W 148.71519981 12563.49 99.37 269.49 8877.33 8934.38 5670.61 7022.67 6498.48 -2908.46 -5811.30 4.71 5972132.68 658361.67 N 70.33052837 W 148.71545742 12594.76 99.12 268.32 8872.31 8929.36 5701.41 7053.54 6526.36 -2909.05 -5842.15 3.78 5972131.42 658330.83 N 70.33052669 W 148.71570767 12626.82 99.02 268.86 8867.25 8924.30 5732.99 7085.20 6555.05 -2909.83 -5873.80 1.69 5972129.95 658299.21 N 70.33052450 W 148.71596435 12659.52 98.74 268.60 8862.20 8919.25 5765.22 7117.50 6584.32 -2910.54 -5906.10 1.16 5972128.52 658266.94 N 70.33052247 W 148.71622629 12689.27 98.78 269.27 8857.67 8914.72 5794.56 7146.91 6610.95 -2911.09 -5935.50 2.23 5972127.33 658237.56 N 70.33052091 W 148.71646471 12722.27 98.78 270.27 8852.64 8909.69 5827.13 7179.52 6640.30 -2911.22 -5968.11 2.99 5972126.49 658204.96 N 70.33052048 W 148.71672920 12754.53 98.60 268.79 8847.76 8904.81 5858.98 7211.41 6669.09 -2911 .48 -6000.00 4.57 5972125.53 658173.09 N 70.33051970 W 148.71698781 Last MWD+IFR+M8 12787.33 98.53 269.89 8842.88 8899.93 5891.35 7243.84 6698.44 -2911.85 -6032.43 3.32 5972124.45 658140.67 N 70.33051861 W 148.71725083 TD (Projected Inc Only) 12844.00 98.40 269.89 8834.53 8891.58 5947.34 7299.90 6749.01 -2911.96 -6088.49 0.23 5972123.11 658084.64 N 70.33051819 W 148.71770542 Survey Type: Definitive Survey NOTES: MWD - Standard -- ( Measurement While Drilling with no (or no known) special corrections. The model allows for the fact that axial interference may marginally exceed the upper limit specified when the well is near horizontal easUwest. ) MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) . Leqal Description: Northinq (y) mUS] Eastinq (X) UtUS] Surface: 3391 FSL 882 FEL S6 T11 N R14E UM 5975167.41 664107.51 Tie-In: 3391 FSL 881 FEL 86 TII N R14E UM 5975167.74 664107.66 BHL: 476 FSL 2077 FEL S1 T11 N R13E UM 5972123.11 658084.64 SurveyEditor Ver 3.1 RT-8P3.03-HF5.00 Bld( d031 rt-546 ) E-37\E-37\E-37 APB 1 \E-37 APB1 Generated 3/3/2005 11: lOAM Page 6 of 6 TREE = 4 1/16" 5M , WELLHfiAD = FMC Gen- 5 ACTUA TOR = KB. ELEV = 28.05' BF. ELEV = KOP= 10,215' MD Max Ângle^= 98 Deg @12,4Ó5 ,.~.....,' .__..".,"'~u~u____,_,_. . ,.'''~''uu Datum MD = 13,130' Datum ìVD = 8,939'~~-' E-37A . . FROM DRLG .. DRAFT 110-3/4" CSG, 45.5#, NT-80, ID = 9.953"H I~ --1-( 9899 MD 3380 6298 83/2 3798' Calculated TOC Values Gauge hole = - 5,825' 50% Washout = - 7,834' Top of 4-1/2" LNR -10,039' Top of Whipstock -10,215' Top of 7-5/8" EZSV Tail Pipe left in the hole consisting of the following: 7-5/8" x 4-1/2" BKR SABL-3 PKR, ID=3.875" 4-1/2" HES CIBP 4-1/2" HES X Nip, ID=3.813" 4-1/2" HES XN Nip, ID=3.725" 4-1/2" WLEG TOP 5 1/2" LNR H 10817' 7-518" CSG, 29.7#, S-95, ID = 6.875"-1 10952' ) o 4-112" 12.6#, 13Cr TBG, ID = 3.958' HES 4-1/2" X Nipple 10 = 3.813" @ 2,228' ìVD GAS LIFT MANDRELS DEV TYÆ VLV LATCH KBG 2 DOME BK KBG 2 SO BK KBG 2 DMY BK KBG 2 DMY BK DATE 2/1 0/05 211 0/05 1/29/05 1/29/05 PORT 16 20 o o 3275 5625 7277 8498 HES 4-1/2" X Nipple 10 = 3.813" @ 9,967' BKR 7-5/8" x 4-1/2" S-3 PKR @ 9,989' HES 4-1/2" X Nipple 10 = 3.813" @ 10,014' HES 4-1/2" XN Nipple 10 = 3.725" @ 10,034' 4-1/2" WLEG @ 10,047' PBTO -13,038' 4-1/2" Solid LNR, 12.6#, L-80 -13,129' 11600' H 3 3/8" BKR IBP 11920' 1-1 3 3/8" BKR IBP 12379' H BKR IBP I PBTD -I 12379' PERFORA TION SUMMARY ANGLE AT TOP PERF: -93 @ 11340' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 21/2" 4 11340'-12340' 0 01/27/05 2 7/8" 4 12710'-13030' 0 01/27/05 COMMENTS 151/2" LNR, 17#, L-80, .0232 bpf, ID = 4.892"H 12512' I DATE 08/04/95 08/10/01 09/05/02 07/12/03 09/17/03 03/03/04 REV BY DATE 03/17/04 11/08/04 01/29/05 02/10/05 REV BY COMMENTS ANYITLP Perf Corrections 'rWJA Pre-rig work for Sidetrack WRD Actual Completion after Sidetrack RMHlPJC GL V ClO Original Horizonatal Completion RN/RP Corrections CWS/tlh Add Perfs CMOITLP KB Bevation Correction RMHlTLP Perf Angle Correction TJS GL V C/O PRUDHOE BA Y UNfT WELL: E-37A PERMfT No: XXX-XXXX API No: 50-029-22571-01 SEC 6, T11 N, R14E 3391' FSL & 881' FEL BP Exploration (Alaska) "" SCHLUMBERGER Survey report Client......... ..........: BP Exploration (Alaska) Inc. Field........ ............: Prudhoe Bay Well. . . . . . . . . . . . . . . . . . . . .: E-37A API number....... ........: 50-029-22571-01 Engineer........ .........: M. Dammeyer Rig:........... ..........: Nabors 7ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS.. ...... ...: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Drill Floor GL above permanent. ......: 28.05 ft KB above permanent... ....: N/A TOP DRIVE DF above permanent.......: 57.05 ft ----- Vertical section origin---------------- Latitude (+N/S-). ........: 0.00 ft Departure (+E/W-) ........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-) .........: 0.00 ft Departure (+E/W-) ..... ...: 0.00 ft Azimuth from Vsect Origin to target: 233.69 degrees Spud date..... ...........: 17-Jan-05 Last survey date.........: 23-Jan-05 Total accepted surveys...: 94 MD of first survey.......: 10192.49 ft MD of last survey.... ....: 13130.00 ft . ----- Geomagnetic data ---------------------- Magnetic model.. .........: BGGM version 2004 Magnetic date. ... ........: 18-Jan-2005 Magnetic field strength..: 1152.64 HCNT Magnetic dec (+E/W-).....: 24.94 degrees Magnetic dip......... ....: 80.88 degrees ----- MWD survey Reference Reference G......... .....: Reference H.......... ....: Reference Dip............: Tolerance of G. ... ... ....: Tolerance of H....... ....: Tolerance of Dip..... ....: Criteria --------- 1002.68 mGal 1152.64 HCNT 80.88 degrees (+/-) 2.50 mGal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-). ....: 24.94 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) ....: 24.94 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction . ;\OY--d ~)- ., SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 10192.49 51. 25 243.93 0.00 8688.87 3420.50 -3059.52 -3565.77 4698.44 229.37 0.00 TIP 2 10215.00 51. 04 243.59 22.51 8702.99 3435.85 -3067.27 -3581.49 4715.43 229.42 1.50 Top of Window 3 10227.00 51. 40 246.00 12.00 8710.51 3444.12 -3071.25 -3589.96 4724.44 229.45 15.94 Bottom of Window 4 10233.00 51. 40 246.00 6.00 8714.25 3448.31 -3073.16 -3594.24 4728.94 229.47 0.00 End of Mill Run 5 10249.62 51.95 248.82 16.62 8724.56 3460.10 -3078.17 -3606.28 4741.34 229.52 13.72 BP INC+TREND 6 10276.79 51.11 253.49 27.17 8741.47 3479.89 -3085.04 -3626.40 4761.11 229.61 13.81 BP INC+TREND . - 7 10310.85 50.70 259.38 34.06 8762.96 3505.25 -3091.24 -3652.07 4784.70 229.75 13 .47 BP INC+TREND - 8 10344.45 50.61 263.27 33.60 8784.26 3530.72 -3095.16 -3677.75 4806.85 229.92 8.96 MWD IFR MS None - 9 10373.43 51. 45 267.67 28.98 8802.49 3553.06 -3096.93 -3700.20 4825.19 230.07 12.15 MWD IFR MS None - 10 10407.11 53.22 273.76 33.68 8823.09 3579.68 -3096.58 -3726.84 4845.42 230.28 15.24 MWD IFR MS None 11 10437.63 54.69 278.78 30.52 8841. 05 3604.30 -3093.88 -3751.35 4862.58 230.49 14.14 MWD IFR MS None - 12 10469.20 55.98 285.45 31.57 8859.02 3629.88 -3088.42 -3776.71 4878.72 230.73 17.85 MWD IFR MS None - 13 10505.54 59.48 290.21 36.34 8878.43 3659.51 -3079.00 -3805.94 4895.44 231.03 14.67 MWD IFR MS None - 14 10539.26 61. 57 292.21 33.72 8895.02 3687.34 -3068.37 -3833.30 4910.10 231.32 8.07 MWD IFR MS None - 15 10564.85 63.04 289.36 25.59 8906.92 3708.87 -3060.34 -3854.48 4921. 65 231.55 11.41 MWD IFR MS None 16 10600.08 66.65 290.18 35.23 8921.89 3739.34 -3049.55 -3884.48 4938.52 231.87 10.46 MWD IFR MS None - 17 10633.17 70.26 286.64 33.09 8934.04 3768.95 -3039.84 -3913.68 4955.56 232.16 14.76 MWD IFR MS None - 18 10663.01 73.46 283.96 29.84 8943.33 3796.61 -3032.37 -3941.03 4972.62 232.42 13.70 MWD IFR MS None - 19 10715.06 74.66 288.12 52.05 8957.63 3845.29 -3018.54 -3989.11 5002.46 232.89 8.02 MWD IFR MS None - 20 10748.56 75.69 287.51 33.50 8966.20 3876.54 -3008.63 -4019.94 5021.13 233.19 3.54 MWD IFR MS None 21 10777 . 68 75.62 284.95 29.12 8973.42 3903.96 -3000.75 -4047.03 5038.15 233.44 8.52 MWD IFR MS Non. - 22 10811.17 75.65 287.01 33.49 8981.73 3935.53 -2991.81 -4078.22 5057.94 233.74 5.96 MWD IFR MS Non - 23 10843.05 76.64 285.01 31.88 8989.36 3965.64 -2983.28 -4107.97 5076.94 234.01 6.84 MWD IFR MS None - 24 10874.15 79.41 284.80 31. 10 8995.82 3995.37 -2975.45 -4137.36 5096.19 234.28 8.93 MWD IFR MS None - 25 10905.55 82.43 283.28 31. 40 9000.77 4025.76 -2967.94 -4167.44 5116.27 234.54 10.74 MWD IFR MS None 26 10939.38 85.43 282.01 33.83 9004.35 4058.89 -2960.57 -4200.26 5138.79 234.82 9.62 MWD IFR MS None - 27 10969.20 87.87 282.76 29.82 9006.09 4088.23 -2954.19 -4229.33 5158.92 235.07 8.56 MWD IFR MS None - 28 11001.73 90.48 280.09 32.53 9006.56 4120.37 -2947.75 -4261.21 5181.42 235.33 11. 48 MWD IFR MS None - 29 11036.33 92.95 279.02 34.60 9005.52 4154.70 -2942.01 -4295.31 5206.26 235.59 7.78 MWD IFR MS None - 30 11063.42 95.15 278.79 27.09 9003.61 4181.56 -2937.82 -4322.01 5225.95 235.79 8.17 MWD IFR MS None · SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 11096.83 95.46 278.67 33.41 9000.52 4214.64 -2932.77 -4354.89 5250.35 236.04 0.99 MWD IFR MS None - 32 11128.51 93.95 279.68 31.68 8997.92 4246.00 -2927.74 -4386.06 5273.44 236.28 5.73 MWD IFR MS None - 33 11159.30 91. 54 281.39 30.79 8996.45 4276.46 -2922.12 -4416.29 5295.50 236.51 9.59 MWD IFR MS None 34 11192.33 90.68 281.00 33.03 8995.81 4309.12 -2915.71 -4448.68 5319.03 236.76 2.86 MWD IFR MS None - 35 11224.77 90.20 279.58 32.44 8995.56 4341.27 -2909.91 -4480.60 5342.60 237.00 4.62 MWD IFR MS None 36 11254.65 90.10 279.81 29.88 8995.48 4370.93 -2904.88 -4510.05 5364.60 237.21 0.84 MWD IFR MS Non. - 37 11288.80 90.41 279.18 34.15 8995.33 4404.83 -2899.25 -4543.73 5389.91 237.46 2.06 MWD IFR MS Non - 38 11321. 51 92.57 279.11 32.71 8994.48 4437.32 -2894.05 -4576.02 5414.37 237.69 6.61 MWD IFR MS None - 39 11351.14 94.49 278.63 29.63 8992.65 4466.72 -2889.49 -4605.23 5436.67 237.89 6.68 MWD IFR MS None - 40 11383.51 95.49 278.91 32.37 8989.84 4498.78 -2884.57 -4637.10 5461. 09 238.12 3.21 MWD IFR MS None 41 11416.77 95.46 278.61 33.26 8986.67 4531.70 -2879.53 -4669.83 5486.25 238.34 0.90 MWD IFR MS None - 42 11446.31 94.87 277.13 29.54 8984.01 4561.00 -2875.50 -4698.97 5508.98 238.54 5.37 MWD IFR MS None - 43 11479.90 92.61 277.86 33.59 8981.81 4594.40 -2871.13 -4732.20 5535.08 238.75 7.07 MWD IFR MS None - 44 11511.85 92.23 276.76 31.95 8980.47 4626.21 -2867.07 -4763.86 5560.08 238.96 3.64 MWD IFR MS None - 45 11542.63 92.50 274.48 30.78 8979.20 4656.92 -2864.06 -4794.46 5584.77 239.15 7.45 MWD IFR MS None 46 11577.77 92.26 271. 90 35.14 8977.74 4692.02 -2862.10 -4829.52 5613.90 239.35 7.37 MWD IFR MS None - 47 11606.87 92.40 270.84 29.10 8976.55 4721.09 -2861.41 -4858.58 5638.57 239.50 3.67 MWD IFR MS None - 48 11638.04 90.89 271.10 31.17 8975.66 4752.24 -2860.88 -4889.74 5665.17 239.67 4.92 MWD IFR MS None - 49 11669.69 90.31 269.16 31.65 8975.33 4783.85 -2860.81 -4921.38 5692.47 239.83 6.40 MWD IFR MS None - 50 11702.05 90.51 267.53 32.36 8975.09 4816.12 -2861.74 -4953.73 5720.92 239.99 5.07 MWD IFR MS None 51 11734.32 89.55 264.76 32.27 8975.08 4848.18 -2863.91 -4985.92 5749.90 240.13 9.08 MWD IFR MS Non. - 52 11766.19 89.17 264.44 31.87 8975.43 4879.73 -2866.91 -5017.65 5778.92 240.26 1. 56 MWD IFR MS Non - 53 11798.42 89.41 264.98 32.23 8975.83 4911.65 -2869.88 -5049.74 5808.28 240.39 1. 83 MWD IFR MS None - 54 11829.43 89.52 265.00 31.01 8976.12 4942.38 -2872.59 -5080.63 5836.48 240.52 0.36 MWD IFR MS None - 55 11861.25 89.59 265.16 31.82 8976.37 4973.92 -2875.32 -5112.33 5865.44 240.65 0.55 MWD IFR MS None 56 11893.61 89.55 265.65 32.36 8976.61 5006.03 -2877.91 -5144.58 5894.84 240.78 1. 52 MWD IFR MS None - 57 11924.96 89.45 265.53 31.35 8976.89 5037.14 -2880.32 -5175.84 5923.31 240.90 0.50 MWD IFR MS None - 58 11957.41 89.38 267.09 32.45 8977.22 5069.39 -2882.41 -5208.22 5952.63 241.04 4.81 MWD IFR MS None - 59 11988.56 89.45 266.76 31.15 8977.54 5100.38 -2884.08 -5239.32 5980.67 241. 17 1. 08 MWD IFR MS None - 60 12021.27 89.76 265.83 32.71 8977.76 5132.89 -2886.20 -5271.96 6010.30 241.30 3.00 MWD IFR MS None · SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 12052.99 92.74 265.66 31.72 8977.07 5164.37 -2888.55 -5303.59 6039.18 241. 43 9.41 MWD IFR MS None - 62 12085.31 93.57 266.44 32.32 8975.29 5196.42 -2890.77 -5335.78 6068.53 241. 55 3.52 MWD IFR MS None - 63 12117.27 94.22 268.54 31. 96 8973.12 5228.18 -2892.17 -5367.63 6097.22 241.68 6.86 MWD IFR MS None - 64 12149.22 92.36 265.89 31.95 8971.29 5259.93 -2893.72 -5399.49 6126.02 241. 81 10.12 MWD IFR MS None - 65 12181.72 91.99 265.82 32.50 8970.05 5292.17 -2896.07 -5431.88 6155.69 241. 94 1.16 MWD IFR MS None 66 12212.75 91.99 265.74 31.03 8968.98 5322.96 -2898.35 -5462.81 6184.07 242.05 0.26 MWD IFR MS Non. - 67 12244.08 91. 88 267.96 31.33 8967.92 5354.11 -2900.07 -5494.07 6212.50 242.17 7.09 MWD IFR MS Non - 68 12276.06 91. 71 268.04 31.98 8966.92 5385.97 -2901.18 -5526.01 6241. 29 242.30 0.59 MWD IFR MS None - 69 12308.67 92.95 266.57 32.61 8965.59 5418.41 -2902.71 -5558.56 6270.83 242.43 5.89 MWD IFR MS None - 70 12340.51 95.73 267.70 31.84 8963.18 5450.01 -2904.30 -5590.26 6299.69 242.55 9.42 MWD IFR MS None 71 12372.88 96.90 267.88 32.37 8959.62 5482.07 -2905.54 -5622.41 6328.80 242.67 3.66 MWD IFR MS None - 72 12404.83 97.73 269.82 31. 95 8955.55 5513.69 -2906.18 -5654.10 6357.25 242.80 6.56 MWD IFR MS None - 73 12436.95 97.42 270.27 32.12 8951.32 5545.49 -2906.15 -5685.94 6385.58 242.93 1. 69 MWD IFR MS None - 74 12467.17 95.52 270.19 30.22 8947.91 5575.49 -2906.03 -5715.96 6412.27 243.05 6.29 MWD IFR MS None - 75 12497.82 92.90 269.64 30.65 8945.66 5606.02 -2906.08 -5746.53 6439.55 243.17 8.73 MWD IFR MS None 76 12532.07 90.44 267.73 34.25 8944.66 5640.17 -2906.86 -5780.75 6470.47 243.30 9.09 MWD IFR MS None - 77 12566.29 90.98 270.70 34.22 8944.24 5674.32 -2907.33 -5814.96 6501.26 243.44 8.82 MWD IFR MS None - 78 12593.47 88.41 269.30 27.18 8944.38 5701.47 -2907.33 -5842.14 6525.58 243.54 10.77 MWD IFR MS None - 79 12627.03 89.54 266.26 33.56 8944.99 5734.90 -2908.63 -5875.66 6556.18 243.66 9.66 MWD IFR MS None - 80 12659.76 90.74 267.53 32.73 8944.91 5767.46 -2910.41 -5908.34 6586.27 243.78 5.34 MWD IFR MS None 81 12689.70 91.70 267.25 29.94 8944.27 5797.27 -2911.77 -5938.24 6613.71 243.88 3.34 MWD IFR MS Non. - 82 12722.86 92.70 268.04 33.16 8943.00 5830.28 -2913.13 -5971.35 6644.05 243.99 3.84 MWD IFR MS Non - 83 12755.08 92.70 268.17 32.22 8941.48 5862.36 -2914.20 -6003.52 6673.44 244.11 0.40 MWD IFR MS None - 84 12784.37 91.98 268.24 29.29 8940.28 5891. 54 -2915.11 -6032.77 6700.16 244.21 2.47 MWD IFR MS None - 85 12817.83 91.19 269.33 33.46 8939.36 5924.91 -2915.82 -6066.21 6730.59 244.33 4.02 MWD IFR MS None 86 12850.02 90.71 269.72 32.19 8938.82 5957.05 -2916.09 -6098.39 6759.73 244.44 1. 92 MWD IFR MS None - 87 12880.68 89.89 270.29 30.66 8938.66 5987.67 -2916.09 -6129.05 6787.40 244.56 3.26 MWD IFR MS None - 88 12914.11 89.65 271.26 33.43 8938.79 6021.08 -2915.63 -6162.48 6817.41 244.68 2.99 MWD IFR MS None - 89 12946.80 89.65 270.09 32.69 8938.99 6053.75 -2915.25 -6195.16 6846.80 244.80 3.58 MWD IFR MS None - 90 12975.61 89.61 270.23 28.81 8939.18 6082.54 -2915.17 -6223.97 6872.85 244.90 0.51 MWD IFR MS None . .. po SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) ( deg ) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 13009.35 89.75 271.72 33.74 8939.37 6116.26 -2914.59 -6257.70 6903.17 245.03 4.44 MWD IFR MS None - 92 13041. 95 89.89 272.42 32.60 8939.47 6148.86 -2913.42 -6290.28 6932.22 245.15 2.19 MWD IFR MS None 93 13073.43 89.82 272.57 31.48 8939.55 6180.34 -2912.05 -6321.73 6960.20 245.27 0.53 MWD IFR MS None 94 13130.00 89.82 272.57 56.57 8939.73 6236.91 -2909.51 -6378.25 7010.51 245.48 0.00 Projection to TD [(c)2005 IDEAL ID9_1C_01.4] . . .. ',. SCRLUMBERGER Survey report Client......... ..... .....: BP Exploration (Alaska) Inc. Field....... .............: Prudhoe Bay Well. . . . . . . . . . . . . . . . . . . . .: E-37APB1 API number........ .......: 50-029-22571-71 Engineer........ ...... ...: M. Perdomo Rig:..... ......... .......: Nabors 7ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS.. .........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum. .........: Mean Sea Level Depth reference..... .....: Drill Floor GL above permanent. .., ...: 28.05 ft KB above permanent.......: N/A TOP DRIVE DF above permanent... ....: 57.05 ft ----- vertical section origin---------------- Latitude (+N/S-) .........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).. .......: 0.00 ft Departure (+E/W-) .... ....: 0.00 ft Azimuth from Vsect Origin to target: 233.69 degrees [(c)2005 IDEAL ID9_1C_01.4J SCRLUMBERGER Survey Report Spud date..... ...........: 17-Jan-05 Last survey date.........: 22-Jan-05 Total accepted surveys...: 85 MD of first survey... ....: 10192.49 ft MD of last survey........: 12181.72 ft . ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2004 Magnetic date............: 18-Jan-2005 Magnetic field strength..: 1152.64 RCNT Magnetic dec (+E/W-).. ...: 24.94 degrees Magnetic dip.............: 80.88 degrees ----- MWD survey Reference Reference G..............: Reference R.. ............: Reference Dip............: Tolerance of G.. .........: Tolerance of R...... .....: Tolerance of Dip...... ...: Criteria --------- 1002.68 mGal 1152.64 RCNT 80.88 degrees (+/-) 2.50 mGal (+/-) 6.00 RCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.94 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-). ...: 24.94 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction . ÅD\--6tJJ- -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/s- +E/w- displ Azim (degl tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 10192.49 51. 25 243.93 0.00 8688.87 3420.50 -3059.52 -3565.77 4698.44 229.37 0.00 TIP 2 10215.00 51. 04 243.59 22.51 8702.99 3435.85 -3067.27 -3581.49 4715.43 229.42 1. 50 Top of Window 3 10227.00 51. 40 246.00 12.00 8710.51 3444.12 -3071.25 -3589.96 4724.44 229.45 15.94 Bottom of Window 4 10233.00 51. 40 246.00 6.00 8714.25 3448.31 -3073.16 -3594.24 4728.94 229.47 0.00 End of Mill Run 5 10249.62 51.95 248.82 16.62 8724.56 3460.10 -3078.17 -3606.28 4741.34 229.52 13.72 BP INC+TREND 6 10276.79 51. 11 253.49 27.17 8741.47 3479.89 -3085.04 -3626.40 4761.11 229.61 13.81 BP INC+TREND - 7 10310.85 50.70 259.38 34.06 8762.96 3505.25 -3091.24 -3652.07 4784.70 229.75 13 .47 BP INC+TREND - 8 10344.45 50.61 263.27 33.60 8784.26 3530.72 -3095.16 -3677.75 4806.85 229.92 8.96 MWD IFR MS Non. - 9 10373.43 51. 45 267.67 28.98 8802.49 3553.06 -3096.93 -3700.20 4825.19 230.07 12.15 MWD IFR MS Non - 10 10407.11 53.22 273.76 33.68 8823.09 3579.68 -3096.58 -3726.84 4845.42 230.28 15.24 MWD IFR MS None 11 10437.63 54.69 278.78 30.52 8841.05 3604.30 -3093.88 -3751.35 4862.58 230.49 14.14 MWD IFR MS None - 12 10469.20 55.98 285.45 31.57 8859.02 3629.88 -3088.42 -3776.71 4878.72 230.73 17.85 MWD IFR MS None - 13 10505.54 59.48 290.21 36.34 8878.43 3659.51 -3079.00 -3805.94 4895.44 231.03 14.67 MWD IFR MS None - 14 10539.26 61. 57 292.21 33.72 8895.02 3687.34 -3068.37 -3833.30 4910.10 231.32 8.07 MWD IFR MS None - 15 10564.85 63.04 289.36 25.59 8906.92 3708.87 -3060.34 -3854.48 4921.65 231. 55 11. 41 MWD IFR MS None 16 10600.08 66.65 290.18 35.23 8921.89 3739.34 -3049.55 -3884.48 4938.52 231.87 10.46 MWD IFR MS None - 17 10633.17 70.26 286.64 33.09 8934.04 3768.95 -3039.84 -3913.68 4955.56 232.16 14.76 MWD IFR MS None - 18 10663.01 73.46 283.96 29.84 8943.33 3796.61 -3032.37 -3941.03 4972.62 232.42 13.70 MWD IFR MS None - 19 10715.06 74.66 288.12 52.05 8957.63 3845.29 -3018.54 -3989.11 5002.46 232.89 8.02 MWD IFR MS None - 20 10748.56 75.69 287.51 33.50 8966.20 3876.54 -3008.63 -4019.94 5021.13 233.19 3.54 MWD IFR MS None 21 10777.68 75.62 284.95 29.12 8973.42 3903.96 -3000.75 -4047.03 5038.15 233.44 8.52 MWD IFR MS None - 22 10811.17 75.65 287.01 33.49 8981.73 3935.53 -2991.81 -4078.22 5057.94 233.74 5.96 MWD IFR MS None - 23 10843.05 76.64 285.01 31. 88 8989.36 3965.64 -2983.28 -4107.97 5076.94 234.01 6.84 MWD IFR MS Non. - 24 10874.15 79.41 284.80 31.10 8995.82 3995.37 -2975.45 -4137.36 5096.19 234.28 8.93 MWD IFR MS Non - 25 10905.55 82.43 283.28 31.40 9000.77 4025.76 -2967.94 -4167.44 5116.27 234.54 10.74 MWD IFR MS None 26 10939.38 85.43 282.01 33.83 9004.35 4058.89 -2960.57 -4200.26 5138.79 234.82 9.62 MWD IFR MS None - 27 10969.20 87.87 282.76 29.82 9006.09 4088.23 -2954.19 -4229.33 5158.92 235.07 8.56 MWD IFR MS None - 28 11001.73 90.48 280.09 32.53 9006.56 4120.37 -2947.75 -4261.21 5181.42 235.33 11. 48 MWD IFR MS None - 29 11036.33 92.95 279.02 34.60 9005.52 4154.70 -2942.01 -4295.31 5206.26 235.59 7.78 MWD IFR MS None - 30 11063.42 95.15 278.79 27.09 9003.61 4181.56 -2937.82 -4322.01 5225.95 235.79 8.17 MWD IFR MS None [(c)2005 IDEAL ID9_1C_01.4J SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 11096.83 95.46 278.67 33.41 9000.52 4214.64 -2932.77 -4354.89 5250.35 236.04 0.99 MWD IFR MS None - 32 11128.51 93.95 279.68 31. 68 8997.92 4246.00 -2927.74 -4386.06 5273.44 236.28 5.73 MWD IFR MS None - 33 11159.30 91. 54 281.39 30.79 8996.45 4276.46 -2922.12 -4416.29 5295.50 236.51 9.59 MWD IFR MS None - 34 11192.33 90.68 281.00 33.03 8995.81 4309.12 -2915.71 -4448.68 5319.03 236.76 2.86 MWD IFR MS None - 35 11224.77 90.20 279.58 32.44 8995.56 4341.27 -2909.91 -4480.60 5342.60 237.00 4.62 MWD IFR MS None 36 11254.65 90.10 279.81 29.88 8995.48 4370.93 -2904.88 -4510.05 5364.60 237.21 0.84 MWD IFR MS None - 37 11288.80 90.41 279.18 34.15 8995.33 4404.83 -2899.25 -4543.73 5389.91 237.46 2.06 MWD IFR MS None - 38 11321.51 92.57 279.11 32.71 8994.48 4437.32 -2894.05 -4576.02 5414.37 237.69 6.61 MWD IFR MS Non. - 39 11351.14 94.49 278.63 29.63 8992.65 4466.72 -2889.49 -4605.23 5436.67 237.89 6.68 MWD IFR MS Non - 40 11383.51 95.49 278.91 32.37 8989.84 4498.78 -2884.57 -4637.10 5461.09 238.12 3.21 MWD IFR MS None 41 11416.77 95.46 278.61 33.26 8986.67 4531.70 -2879.53 -4669.83 5486.25 238.34 0.90 MWD IFR MS None - 42 11446.31 94.87 277.13 29.54 8984.01 4561.00 -2875.50 -4698.97 5508.98 238.54 5.37 MWD IFR MS None - 43 11479.90 92.61 277.86 33.59 8981.81 4594.40 -2871.13 -4732.20 5535.08 238.75 7.07 MWD IFR MS None - 44 11511. 85 92.23 276.76 31.95 8980.47 4626.21 -2867.07 -4763.86 5560.08 238.96 3.64 MWD IFR MS None - 45 11542.63 92.50 274.48 30.78 8979.20 4656.92 -2864.06 -4794.46 5584.77 239.15 7.45 MWD IFR MS None 46 11577.77 92.26 271.90 35.14 8977.74 4692.02 -2862.10 -4829.52 5613 . 90 239.35 7.37 MWD IFR MS None - 47 11606.87 92.40 270.84 29.10 8976.55 4721.09 -2861.41 -4858.58 5638.57 239.50 3.67 MWD IFR MS None - 48 11638.04 90.89 271.10 31.17 8975.66 4752.24 -2860.88 -4889.74 5665.17 239.67 4.92 MWD IFR MS None - 49 11669.69 90.31 269.16 31.65 8975.33 4783.85 -2860.81 -4921.38 5692.47 239.83 6.40 MWD IFR MS None - 50 11702.05 90.51 267.53 32.36 8975.09 4816.12 -2861.74 -4953.73 5720.92 239.99 5.07 MWD IFR MS None 51 11734.32 89.55 264.76 32.27 8975.08 4848.18 -2863.91 -4985.92 5749.90 240.13 9.08 MWD IFR MS None - 52 11766.19 89.17 264.44 31.87 8975.43 4879.73 -2866.91 -5017.65 5778.92 240.26 1. 56 MWD IFR MS None - 53 11798.42 89.41 264.98 32.23 8975.83 4911.65 -2869.88 -5049.74 5808.28 240.39 1. 83 MWD IFR MS Non. - 54 11829.43 89.52 265.00 31.01 8976.12 4942.38 -2872.59 -5080.63 5836.48 240.52 0.36 MWD IFR MS Non - 55 11861.25 89.59 265.16 31. 82 8976.37 4973.92 -2875.32 -5112.33 5865.44 240.65 0.55 MWD IFR MS None 56 11893.61 89.55 265.65 32.36 8976.61 5006.03 -2877.91 -5144.58 5894.84 240.78 1. 52 MWD IFR MS None - 57 11924.96 89.45 265.53 31.35 8976.89 5037.14 -2880.32 -5175.84 5923.31 240.90 0.50 MWD IFR MS None - 58 11957.41 89.38 267.09 32.45 8977.22 5069.39 -2882.41 -5208.22 5952.63 241. 04 4.81 MWD IFR MS None - 59 11988.56 89.45 266.76 31.15 8977.54 5100.38 -2884.08 -5239.32 5980.67 241.17 1. 08 MWD IFR MS None - 60 12021.27 89.76 265.83 32.71 8977.76 5132.89 -2886.20 -5271.96 6010.30 241.30 3.00 MWD IFR MS None [(c)2005 IDEAL ID9_1C_01.4] SCHLUMBERGER Survey Report ." ., -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 12052.99 92.74 265.66 31.72 8977.07 5164.37 -2888.55 -5303.59 6039.18 241. 43 9.41 MWD IFR MS None - 62 12085.31 93.57 266.44 32.32 8975.29 5196.42 -2890.77 -5335.78 6068.53 241. 55 3.52 MWD IFR MS None - 63 12117.27 94.22 268.54 31.96 8973.12 5228.18 -2892.17 -5367.63 6097.22 241.68 6.86 MWD IFR MS None - 64 12149.22 92.36 265.89 31. 95 8971.29 5259.93 -2893.72 -5399.49 6126.02 241.81 10.12 MWD IFR MS None - 65 12181.72 91.99 265.82 32.50 8970.05 5292.17 -2896.07 -5431.88 6155.69 241. 94 1.16 MWD IFR MS None 66 12212.75 91. 99 265.74 31. 03 8968.98 5322.96 -2898.35 -5462.81 6184.07 242.05 0.26 MWD IFR MS None - 67 12244.08 91. 88 267.96 31. 33 8967.92 5354.11 -2900.07 -5494.07 6212.50 242.17 7.09 MWD IFR MS None - 68 12276.06 91. 71 268.04 31.98 8966.92 5385.97 -2901.18 -5526.01 6241. 29 242.30 0.59 MWD IFR MS Non. - 69 12308.67 92.95 266.57 32.61 8965.59 5418.41 -2902.71 -5558.56 6270.83 242.43 5.89 MWD IFR MS Non - 70 12340.51 95.73 267.70 31. 84 8963.18 5450.01 -2904.30 -5590.26 6299.69 242.55 9.42 MWD IFR MS None 71 12372.88 96.90 267.88 32.37 8959.62 5482.07 -2905.54 -5622.41 6328.80 242.67 3.66 MWD IFR MS None - 72 12404.83 97.73 269.82 31.95 8955.55 5513.69 -2906.18 -5654.10 6357.25 242.80 6.56 MWD IFR MS None - 73 12436.95 97.42 270.27 32.12 8951.32 5545.49 -2906.15 -5685.94 6385.58 242.93 1. 69 MWD IFR MS None - 74 12468.70 97.36 268.46 31.75 8947.23 5576.93 -2906.50 -5717.42 6413.79 243.05 5.66 MWD IFR MS None - 75 12498.20 97.11 268.20 29.50 8943.52 5606.11 -2907.36 -5746.67 6440.26 243.16 1.22 MWD IFR MS None 76 12531.36 97.88 269.22 33.16 8939.19 5638.91 -2908.10 -5779.54 6469.94 243.29 3.83 MWD IFR MS None - 77 12563.49 99.37 269.49 32.13 8934.38 5670.62 -2908.45 -5811.30 6498.49 243.41 4.71 MWD IFR MS None - 78 12594.76 99.12 268.32 31.27 8929.35 5701.42 -2909.04 -5842.16 6526.36 243.53 3.78 MWD IFR MS None - 79 12626.82 99.02 268.86 32.06 8924.30 5733.00 -2909.82 -5873.81 6555.05 243.65 1. 69 MWD IFR MS None - 80 12659.52 98.74 268.60 32.70 8919.25 5765.23 -2910.54 -5906.11 6584.33 243.77 1.16 MWD IFR MS None 81 12689.27 98.78 269.27 29.75 8914.72 5794.57 -2911.09 -5935.51 6610.95 243.87 2.23 MWD IFR MS None - 82 12722.27 98.78 270.27 33.00 8909.68 5827.14 -2911.22 -5968.12 6640.30 244.00 2.99 MWD IFR MS None - 83 12754.53 98.60 268.79 32.26 8904.81 5858.98 -2911.48 -6000.01 6669.09 244.12 4.57 MWD IFR MS Non. - 84 12787.33 98.53 269.89 32.80 8899.92 5891.36 -2911. 85 -6032.44 6698.45 244.23 3.32 MWD IFR MS Non 85 12844.00 98.40 269.89 56.67 8891.58 5947.35 -2911.96 -6088.49 6749.02 244.44 0.23 Projection to TD [(c)2005 IDEAL ID9_1C_Ol.4J . [ffi} . AI,~"1iA OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR -. 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay E-37A BP Exploration (Alaska) Inc. Permit No: 205-002 Surface Location: 3391' NSL, 881' WEL, SEC. 06, TllN, RI4E, UM Bottomhole Location: 451' NSL, 2197' WEL, SEC. 01, TllN, R13E, UM Dear Mr. Crane: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission t itness any required test. Contact the Commission's petroleum field inspector at (907) 659 6 ager). ~' '- 6Þ~nnan Chairman DATED this ¡ day of January, 2005 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. o Drill iii Redrill 1a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3391' NSL, 881' WEL, SEC. 06, T11N, R14E, UM / Top of Productive Horizon: 331' NSL, 4842' WEL, SEC. 06, T11 N, R14E, UM Total Depth: 451' NSL, 2197' WEL, SEC. 01, T11N, R13E, UM / 4b. Location of Well (State Base Plane Coordinates): Surface: x- 6641 08 y- 5975167 Zone- ASP4 16. Deviated Wells: Kickoff Depth: 10218 feet Maximum Hole Angle: 93 degrees . tJ 41\- i If!zcð5 (/~ ALASAIL AND ~~;~g~S~L:;~ON CIMISS~rE.CE 1\/E 0 PERMIT TO DRILL DEC 3 0 Z004 20 MC 25.005 / . 1b. Current Well Class 0 EXPloratoI1AIIIÞ6fi:>&rIØmÜnÐ~IiIÞI~~BJb o Stratigraphic Test 0 Service 0 DeveloPrwR~~~ Single Zone 5. Bond: IBI Blanket 0 Single Well 11. Well Fràme an¡j Number: I Bond No. 2S100302630-277 PBU E-37A 1 z:~ 6. Proposed Depth: 12. Field / Pool(s): MD 12948 TVD 8968 Prudhoe Bay Field I Prudhoe Bay 7. Property Designation: Pool ADL 028280 8. Land Use Permit: 13. Approximate Spud Date: January 7,2005 / 14. Distance to Nearest Property: 10,150' 9. Acres in Property: 2560 18. Casing Program: Size Casinç¡ 4-1/2" Hole 6-1/8" Weiç¡ht 12.6# SpeçifiCé!tiorI$ Grade Couplinç¡ Lenç¡th L-80 IBT-M 2880' 10. KB Elevation Planned 15. Distance to Nearest Well Within Pool (Height above GL): 57.5 feet G-01A is 519' away at 12,738' MD 17. Maximum Anticipated Pressures in psig (see 20 MC 25.035) Downhole: 3150 Surface: 2250'/ Setting Quantity of Top . (c:f.or saç MD TVD MD TVD (includinç¡ staç¡e data) 10068' 8606' 12948' 8968' 353 sx Class 'G' / PRESI;NTWELL.GONDITION SI.,JMMARY(Jo bßcompleted forR~rjIIANDR(:}'oøntryOpøration~) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Depth TVD (ft):l 12512 8965 9787",11600',11920'.12379' 9787 8415 MD Junk (measured): None Structural Conductor 105' 20" 260 sx Arcticset (Approx.) 105' 105' Surface 3763' 10-3/4" 1242 sx CS III, 371 sx 'G', 327 sx CS II 3798' 3617' Intermediate Production 10920' 7-5/8" 682 sx Class 'G' 10952' 9013' Liner 1695' 5-1/2" 210 sx Class 'G' 10817' - 12512' 9006' - 8965' 21. Verbal Approval: 22. I hereby Printed Commission Representative: perfOration Depth TVD (ft): 8992' - 8979' IBI Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis o Seabed Report IBI Drilling Fluid Program IBI 20 MC 25.050 Requirements Date: Perforation Depth MD (ft): 10630' - 12389' 20. Attachments IBI Filing Fee, $100 0 BOP Sketch IBI Property Plat 0 Diverter Sketch is true and correct to the best of my knowledge. Title Senior Drilling Engineer Contact Ken Allen, 564-4366 , ~ Phone Prepared By Name/Number: Hubble, 564-4628 Permit To I API Number: Number: 2Q.ç - 00 ? 50- 029-22571-01-00 Conditions of Approval: Sa s Required DYes }2rNo _ ~rog n S~lfide Measur~s ßYes DNa Other: t e '7 t- '"ß Q /;; 0 3Ç"œ p-;. ¡ . ORIS [\JAL Permit ~~ro~~ Date: /I~o/£?S- Mud Log Required Directional Survey Required See cover letter for other requirements DYes ~o )&Yes D No APPROVED BY THE COMMISSION i~£:e Date - ·' . Planned Well Summary Well E-37A I I Well Sidetrack 1 II Target I Zone 1A/18 Type horizontal Objective I AFE Number: I PSD 4P2294 I API Number: I 50-029·22571-01 Surface Northing Easting I Offsets TRS Location 5,975,167.41 664,107.51 1888.4' FNL 1 881.5' FEL 11 N, 14 E, 6 Target Northing Easting I Offsets TRS Location 5,972,022 660,226 4949' FNL 1 4842' FEL 11 N, 14 E, 6 Target Northing Easting I Offsets TRS Location 5,972,187 658,872 4755.5' FNL 11288' FEL 11 N, 13 E, 1 Bottom Northing Easting Offsets TRS Location 5,972,095 657,965 4828.4' FNL 1 2197' FEL 11 N, 13 E, 1 I Planned KOP: Planned Spud: 110,218' md 01/07/05 I Planned TD: 112,948' md Planned TVD: 8,968' I Rig: 1 Nabors 7ES 1 / I BFE: 129.0' I RTE: 157.5' Proximity Issues: Survey Program: Nearest Well: Nearest Property Line Directional ProQram WP04 I Exit point: I 10,218' md I 8,647' sstvd _510 at 10,200' in the original well bore, _930 at -10,137' in the planned 6-1/8" production horizontal. There are no close approach issues in drilling Z-04A. All surrounding / wells pass major risk criteria. Standard MWD+IIFR+MS Well G-01 A, with center-to-center distance of -519' at 12,738' md. 10,150' to the nearest PBU property line. Approved Well plan: Maximum Hole Inclination: LOQ~lÏnq ProQram Cased Hole: Open Hole: Required Sensors I Service Real time MWD Dir/GR/RES/DEN/NEU/DDS throughout the interval. DEN/NEU can be picked up on second run and a MAD performed over the build section on the short trip after TD. Two sample catchers will be required at company man call out. None planned None planned Hole Section: 6-1/8" production: E-37A Permit to Drill Version 1.0 Page 1 ·' . Mud ProQram Hole Section / operation: Type I Density (ppg) I FloPro SF 8.4 - 8.5 PV 8 - 15 I Set Whip stock / mill window in 7-5/8" YP I LSRV I API FL 1 pH 30 - 36 > 30,000 4 - 6 9.0 - 9.5 Hole Section / opeJatjon: FI:l.':SF I De~~W I PV 8 - 15 I Drilling 6-1/8" production interval YP I LSRV I API FL 24 - 30 > 25,000 4 - 6 pH 9.0- 9.5 CasinQ I TubinQ ProQram Hole CasinglTubing Wt. Grade Connection Length Top Bottom Size Size md / tvd md / tvd 6-1/8" 4-1/2" 12.6# L-801 IBT-M / 2,880' 10,068'/ 8,606' 12,948'/8,968' Tubing 4-1/2" 12.6# 13Cr-80 VAM TOP 10,606' Surface 10,068'/ 8,606' Casing String: Slurry Design Basis: Fluids Sequence / Volume: Test 7-5/8" casing to surface Production casing window E-37A Permit to Drill Version 1.0 CementinQ ProQram 4-1/2",12.6#, L-80, IBT-M solid production liner Lead slurry: none planned Tail slurry: 2,730' of 4-1/2" X 6-1/8" annulus with 40% excess, plus 80' of 4· 1/2",12.6# shoe track, plus 150' of 7-5/8" X 4-1/2" liner lap, plus 200' of 7- 5/8" X 4" drill pipe annulus. TO L \ oO~ ~ ' Pre-Flush 15bbls CW 100 Spacer 30bbls MudPUSH II at 9.6ppg Lead Slurry None planned LJ ~) Tail Slurry 75bbl / 423 Cf~ sx Class 'G', 15.8PP~f/Sk. CasinQ I Formation InteQritv TestinQ Test Point Bridge plug to surface 20' beyond middle of window Test Type 30 min recorded FIT Test pressure 3,500psi surface 9.8ppg EMW Page 2 . . Well Control Well control equipment consisting of 5,000psi working pressure pipe rams (2), blind/shear rams, and an annular preventer will be installed and is capable of handling maximum potential surface pressures. BOPE and drilling fluid system schematics are currently on file with the AOGCC. Well Interval: Maximum anticipated BHP: Maximum surface pressure: Calculated kick tolerance: Planned BOPE test pressure: Planned completion fluid: Planned BOPE test pressure: 6-1/8" production liner section 3,150psjßt 8,743' sstvd. 2~psi;(based upon BHP and a full column of gas from TD @ 0.10 psi/ft) ¡(rÍfin~ith 8.9 ppg EMW FIT (FIT to 9.8 ppg EMW) ~si low / 3,500psi high 8.4ppg seawater / 7.0ppg Diesel 250psi low /3,500psi high - 7 day test cycle until a window is milled in 7-5/8" casing. Once a window is milled a 14 day test cycle can commence. /' Disposal Annular Injection: Cuttings Handling: Fluid Handling: No annular injection in this well. Cuttings generated from drilling operations are to be hauled to the Grind and Inject station at DS-04. Any metal cuttings should be sent to the North Slope Borough. All drilling and completion fluids and other Class II wastes are to be hauled to DS-04 for injection. All Class I wastes are to be hauled to Pad 3 for disposal. GeoloQic ProQnosis Formation Planned MD (ft) TVDss (ft) Comments TJD -7892 TJB -8218 TSGR -8386 Hydrocarbon bearing /' TSAD -8457 Hydrocarbon bearing TCGL -8598 Hydrocarbon bearing BCGL 10216 -8647 Hydrocarbon bearing KOP 10218 -8648 Hydrocarbon bearing 23SB 10302 -8700 Hydrocarbon bearing 22TS 10377 -8743 Hydrocarbon bearing 21TS 10509 -8809 Hydrocarbon bearing TZ1B 10656 -8872 Hydrocarbon bearing TDF 10773 -8908 Hydrocarbon bearing BSAD NIA -8950 Hydrocarbon bearing HOT N/A -8959 TD Criteria I TD Criteria: I Drill to TD unless drilling conditions deteriorate. Well plan can be extended if 800' minimum perfs are unobtainable. E-37A Permit to Drill Version 1.0 Page 3 The proposed £-37 A well lies in a moderate risk province of the field for lost circulation at faults as documented by the WURO team and the risk of loss circulation events should be lower than average. Nine loss circulation events were encountered in the Ivishak section in 5 of the surrounding 30 wells as detailed below. No faults are expected to be encountered by the well. Additionally, loss circulation risk for any unmapped fault should be low if it is encountered in the low net/gross Zone 1 A section. A fault is present southeast of the planned well in the build section. The intermediate target (above the landing pt) is a hard point to maintain the wellbore 130 ft away from this fault. Six additional faults are present ranging from 130- 240 feet north and south of the planned well. The polygon lines are hardlines to the north and south but the well can be extended to the west up to 600 feet if necessary. Loss Circulation Events MO SSTVO Formation 10063 -8475 Zone 4 12928 -8905 Zone 1 13480 -8970 Zone 1 9515 -8706 Zone 2 9849 -8853 Zone 2 11311 -8909 Zone 1 11465 -8939 Zone 1 9827 -8935 Zone 1 12220 -8961 Zone 1 Well £-15A £-21A £-21A £-25 £-25 £-25 G-01A G-32A G-32A Type Rig Rig Rig Rig Rig Rig Rig Rig Rig Loss (bbl) 31 25 180 80 55 200 50 310 19 . Fault ProQnosis Operations SUmmary . Fault? No (Cementing) No (Tripping) No (Cementing) No (Tripping) Yes (Tripping) Yes No (ReamlTripping) No Yes (Tripping) Pre-Ria Operations: 1. Bleed OA, IA and tubing pressures to zero. Test the IC (7-5/8") pack-off to 3000 psi, test the tubing pack-off to 5000 psi. Function all LOS, repair or replace as necessary. 2. MIT the OA to 2000 psi for 30 minutes. CMIT T x IA to 3500 psi for 30 minutes. 3. RU Slick-line. Pull XX plug set in top X nipple @ 9,787' (SLM was 9,896' on 3/17/04). RIH and attempt to tag 5-1/2" liner top @ 10,817'. RIH and drift the tubing with a gauge ring / junk basket to the XN nipple @ 9,843'. 4. RU E-line. Set a Halliburton CIBP at 9,809' (the plug will be set in the lower portion of the first pup below the packer). Perform tubing punch & string shot, as needed, to assist the upcoming chemical cut success. RIH and chemical cut the 4-1/2" tubing in the top of the pup just above the packer- 9,791' (about 4' below the X nipple above the packer). The chemical cutter anchor will set above the X nipple. NOTE: The minimum stub length needed after the cut is 6' of 4-1/2" tubing, cut no deeper than 9,792'. 5. Circulate the well to sea water. Freeze protect the IA and tubing with diesel to - 2200'. 6. Bleed all pressures to zero. Set BPV. Secure well. 7. Remove the well house. If necessary, level the pad. Ria Operations: 1. MIRU Nabors 7ES 2. Pull BPV. Circulate out freeze protection and displace well to sea water. 3. Monitor OA, IA and T for pressure. Verify well is dead. . 4. Set TWC. Nipple down tree. Nipple up and test BOPE. Pull TWC. / 5. Pull 4-1/2" tubing from pre-rig cut at - 9,791'. 6. PU overshot assy. RIH picking up 4" OP. Washover tubing stub and rotate K-anchor assy. free, POOH. 7. PU packer milling assy. RIH, mill the packer and push to 5-1/2" liner top, POOH. 8. RU e-line. Run Gauge Ring /Junk Basket for 7-5/8", 29.7# casing with a Gamma Ray tool to top of packer that was previously pushed to bottom. Log Gamma Ray from the tagged packer depth to -9,000' MO for correlation to set the EZSV below Zone 3. £-37A Permit to Orill Version 1.0 Page 4 . . 9. MU 7-5/8", 29.7# EZSV bridge plug on e-line with CCL. RIH and set 20' below the Base Zone 3 (picked from previously run Gamma Log). Estimated EZSV setting depth is 10J238'. RD e-line. Note: The final setting depth for the EZSV (whipstock bottom) will be optimized from the CCL and Gamma Ray logs to avoid cutting a collar and avoid Zone 3 conglomerate. 10. Close blinds and test 7-5/8" casing to 3500 psi for 30 minutes while recording on chart. .------ ¡--n. PU milling / whipstock assembly. RIH picking up DP to top EZSV. Orient and set the whipstock. Change well over to 8.4 ppg milling fluid. Note: If MWD signals are too weak to obtain toolfaces, swap over to milling fluid before setting the whipstock. ; 12. Mill a window in the 7-5/8" casing at ±10,218' MD plus 20' from mid window. Perform FIT to 9.8 ppg// ...y POOH for Drilling BHA. Verify that the mud weight is 8.4 ppg prior to cutting the window. " . 0 - 13. MU the 6-1/8" drilling assembly with DIR/GR/RES/ABI and RIH. ~:I" \ oJ",l,14. Drill the 6-1/8" production interval as per directional plan (building to horizontal and drilling -2,730 MD /" 4:0t Off'" of production hole) to arufestimated TO of 12,948'. Note: This section will be drilled in two runs. The second BHA will consist of DIR/GR/RES/ABI/DEN/NEU. The initial build section will be MAD passed to obtain DEN/NEU data. 15. Run and cement a 4-1/2", 12.6#, L-80 IBT-M liner throughout the 6-1/8" wellbore and 150' back into /' the 7-5/8" drilling liner to 10,068' MD. Set liner top packer and displace well to clean seawater above the liner top. NOTE: A perf pill will be left in the 4-1/2" liner. 16. RIH with opC perf guns, Perf intervals to be determined from LWD logs. Plan to perforate overbalancEÝ.'POOH, LD DP and perf guns. /' 17. Run 4-1/2",12.6#, 13Cr-80 Yam TOP completion, tying into the 4-1/2" liner top. 18. Set packer, test and record the tubing to 3500 psi and annulus to 3500 psi for 30 minutes each. 19. Set and test TWC to 1000 psi. 20. NO BOPE. NU and test the tree to 5000 psi. Pull TWC. / 21. Freeze protect the well to -2200'. Set BPV and secure the well. ' 22. RDMO. Post-Riq Work: 1. Install wellhouse and flowlines. 2. MIRU slickline. Pull the ball and rod / RHC plug from 'XN' nipple below the new production packer. 3. Install gas lift valves. E-37A Permit to Drill Version 1.0 Page 5 . . Job 1: Move In I RiQ Up I Test BOPE Reference RP .:. "Orilling/Workover Close Proximity Surface and Subsurface Wells" SOP. .:. "Hydrogen Sulfide" SOP. .:. "AOW Rig Move" RP. Issues and Potential Hazards ~ BOP test interval during this phase is 7 days. ~ No wells will require shut-in for the rig move onto E-37. However, E-19 is about 35' to the North. There are no wells on the surface to the South of E-37. E-19 is the closest surface neighboring well. E-19 is a current producer. Care should be taken while moving onto the well. Spotters should be employed at all times. .:. There has been a small ice pad connected to the South side of E-pad to allow maneuverability for the truck spotting the pits. Spotters should be utilized while the truck is on this pad. ~ The E-37 well bore will be secured with the following barriers: .:. Note on barriers during MIRU procedures: · Tubing - Kill weight fluid and a BPV. · IA - Kill weight fluid and the annular valve. · OA - Kill weight fluid, tested Annulus and annular valve. .:. Note on barriers during ND Tree I NU BOP Procedures · Tubing - Kill weight fluid and a TWC. · IA - Kill weight fluid and the annular valve. · OA - Kill weight fluid, tested Annulus and annular valve ~ Prior to pulling the tree, verify there is a static column of seawater to suñace and that no pressure exists. E-Pad i~ not rlef:ignated as an H~ site. Standard Operating Procedures for H2S precautions should /' be followed at all times. Recent H2S data from the pad is as follows: Well Name H2S Reading Date #1 Closest SHL with H2S Reading E-19A 0 ppm N/A #2 Closest SHL with H2S Reading E-27A 5 ppm 07/22/04) #1 Closest BHL with H2S Reading G-31A 0 ppm N/A #2 Closest BHL with H2S Reading F-03A 10 ppm 07/26/04 Max Recorded H2S Reading on the Pad E~ 12 10 ppm D9/06J04 E Pad is not an H2S drill site. H2S typically < 10 ppm. ~ Post Permit to Drill and Summary of Drilling Hazards in the dog house and camp prior to spud. E-37A Permit to Orill Version 1.0 Page 6 . . Job 2: De-complete Well Reference RP .:. "De-completions'RP Issues and Potential Hazards Þ- BOP test interval during this phase is 7 days. Þ- Monitor the well to ensure the fluid column remains static prior to pulling the completion. Þ- Note and record required PU weight to pull tubing at cut point (-9,791'). Þ- Have all wellhead and completion equipment NORM-tested, following retrieval. Þ- The existing wellhead is a "FMC/BP New Standard Slimhole" design completed in 1995. It has 7- 5/8" intermediate casing set on a fluted mandrel hanger and packoff. The current completion is a 4-1/2" (most likely NSCT lift threads) hanger with Cameron BPV groove. Have a spear on location as a contingency to pull the Hanger to the floor. Þ- There is a 4-1/2" HES SSSV Landing Nipple at 2205' with 2, 1,4" encapsulated control lines run to surface. The current tubing tally states there are 57 steel bands securing the control lines. Þ- The current 7-5/8" x 4-1/2" SABL-3 Baker packer will be milled until free and pushed down to the 5-1/2" liner top at 10,817' md. .:. The optimum kick off will be just below the Zone 3 conglomerates at 10,218' md. .:. If problems arise milling and pushing the packer to bottom then a contingent TSAG kick off is possible. The shallowest kick off, and still keep a single string 6-1/8" sidetrack, would be a TSAG kick off. The estimated TSAG depth is 8386' ssTVD / 9824' md. Job 3: Run Whip Stock Reference RP .:. "Whipstock Sidetrac/(' RP. .:. "Leak-off and Formation Integrity Tests" SOP Issues and Potential Hazards Þ- BOP test interval during this phase is 7 days until the window is milled into formation. Once the window is milled the 14 day test cycle starts and continues until the rig moves off the well. Þ- A 7-5/8 whip stock will be run and set in the existing 7-5/8" casing. A 6-3/4" window will then be milled in the 7-5/8" casing Þ- According to the volumes pumped, there should be cement behind the 7-5/8" casing at the sidetrack point. Þ- There were 2 Turbolators run per joint on the 7-5/8" liner joints 2 - 33 (-10,900' md - 9,600' md). There is a good change we will mill through one or two Turbolators when milling the window. Þ- The window will be cut in the existing 7-5/8 casing into the Sadlerochit Zone 2 formation. Ensure entire wellbore has been circulated to 8.4ppg mud before milling commences. Þ- Zone 2 formation pressure expected to be 6.8 - 6.9 ppg. E-37A Permit to Drill Version 1.0 Page 7 . . ~ Once milling is complete, circulate a minimum of 1-1/2 bottoms up and pump a "Super Sweep" pill to remove metal debris created from the milling process. Ditch magnets should be used throughout job. ~ Once the milling BHA is out of the hole the entire stack and flow lines should be flushed to remove metal debris that may have settled out in these areas. Ensure BOP equipment is operable. Job 5: Drill 8-1/2" Intermedaite Hole Interval Reference RP .:. "Leak-off and Formation Integrity Tests" SOP .:. "Prudhoe Bay Directional Guidelines" RP .:. "Lubricants for Torque and Drag Managemenf' RP .:. "Shale Drilling, Kingak and HRZ' RP. Issues and Potential Hazards ~ This well bore will exit the original well in the Kuparuk sands (-6,886' MD), and drill to the top of the Sag River formation (-9,044' MD). For this well, the Kingak will require a mud weight of 10 ppg, according to the Kingak Polar plot. Maintain mud weight at 10 ppg from the window to 7" liner point. Follow all shale drilling practices to minimize potential problems. ~ KICK TOLERANC . In the worst-case scenario of 8.2 ppg pore pressure at the Sag River depth, a fracture gradi to 10.7 ppg at the 95/8" casing window, and 10 ppg mud in the hole, the kick tolerance is· fin· . ~ This wellbor oes not have any known or planned fault crossings in the intermediate interval. Job 6: Run and Cement 7" Intermediate Liner Reference RP .:. "Shale Drilling, Kingak and HRZ' RP. .:. "Intermediate Casing and Cementing Guidelines' RP .:. "Running and Cementing a Drilling Liner" RP .:. Schlumberger Cement Program. Issues and Potential Hazards ~ Swab and surge pressure should be minimized with controlled liner running speeds and by breaking circulation slowly. Excessive swab / surge pressures could initiate Kingak instability problems. ~ Ensure the liner top packer is set prior to POOH. Slack off with rotation to the maximum allowable down weight, as per Baker representative. E-37A Permit to Drill Version 1.0 Page 8 . . Job 7: Drill 6-1/8" Production Hole Interval Reference RP .:. "Leak-off and Formation Integrity Tests" SOP .:. "Prudhoe Bay Directional Guidelines' RP .:. "Lubricants for Torque and Drag Management' RP Issues and Potential Hazards ~ The E-37 A wellbore does not cross any known faults. Additionally, lost circulation risk for any unmapped fault should be low if it is encountered in the low net/gross Zone 1 A section. A detailed list of faulting issues is listed on page 4 of this program. ~ Differential sticking is a concern. The 8.4 - 8.6 ppg mud will be -785 psi over balanced to the Ivishak formations. Minimize the time the pipe is left stationary while in open hole (making connections, surveying, etc). ~ Tie the MWD Gamma Ray log back into parent well bore log in the wellsite geologist possession. A 200' MAD pass above the window is usually sufficient. Job 9: Run 4-1/2" Production Liner Reference RP .:. "Modified Conventional Liner Cementing" RP .:. Schlumberger Cement Program. Issues and Potential Hazards ~ The completion design is to run a 4-1/2", 12.6#, L-80 IBT-M solid liner throughout the production interval. ~ Differential sticking is possible. The 8.4 - 8.6 ppg Flo-Pro will be -785 psi over balanced to the Ivishak formations. Minimize the time the pipe is left stationary while running the liner. ~ Ensure the liner top packer is set prior to POOH. Slack off with rotation to the maximum allowable down weight, as per Baker representative. ~ Sufficient 4-1/2" liner will be run to extend -150' back up into the 7" liner. ~ A Hi-Vis perforation pill will be spotted in the 4-1/2" liner as per MIDF recommendations. E-37A Permit to DríJJ Version 1.0 Page 9 . . Phase 10: DPC Perforate Reference RP .:. "Drill Pipe Conveyed Perforating" RP Issues and Potential Hazards ~ The well will be DPC perforated overbalanced, after running and cementing the 4-1/2 liner. Ensure all personnel are well briefed on Schlumberger's perforating procedures and that all responsibilities are understood. Only essential personnel should be present on the rig floor while making up DPC guns. ~ Expect to lose fluid to the formation after perforating. Have ample seawater on location and be prepared with LCM if necessary. Job 12: Run 4-%" 13Cr-80 Completion Reference RP .:. "Completion Design and Running" RP .:. "Handling and Running 13 Chrome" RP .:. "Casing and Tubing connections" RP Issues and Potential Hazards ~ Diesel will be used to freeze protect the well to 2200'. The diesel flash point is 100° F. Diesel vapor pressure is - 0.1 psia at 100° F. ~ The completion, as designed, will be to run a 4-1/2", 12.6#, 13Cr-80, VAM TOP production tubing string, stinging into the 4-1/2" production liner tieback sleeve. Take all the normal precautions while running the VAM TOP 13Cr-80 tubing: clean threads if contaminated, use a stabbing guide, single joint compensator, properly dope and hand-start each pin. Use Jet Lube Seal Guard thread compound and torque turn each connection. Tubing should arrive on location with the proper thread dope. Confirm type of thread compound prior to RIH. E-37A Permit to Drill Version 1.0 Page 10 . . Job 13: ND/NU/Release RiQ Reference RP .:. "ADW Rig Move" RP. .:. "Freeze Protecting an Inner Annulus' RP. Issues and Potential Hazards ~ No wells will require shut-in for the rig move off E-37A. However, E-19 is about 35' to the North. There are no wells on the surface to the South of E-37. E-19 is the closest surface neighboring well. E-19 is a current producer and has been flowing intermittently for the last few months. Care should be taken while moving off the well. Spotters should be employed at all times. .:. There has been a small ice pad connected to the South side of E-pad to allow maneuverability for the truck spotting the pits. Spotters should be utilized while the truck is on this pad. ~ Note on Barriers during the ND BOP I NU Tree procedures: · Tubing - Kill weight fluid and a TWC. · IA - Kill weight fluid, tested annulus and annular valve. ,,/ · OA - Kill weight fluid, tested annulus and annular valve. ~ Note on Barriers during the RDMO procedures: · Tubing - Kill weight fluid and a BPV. · IA - Kill weight fluid, tested annulus and annular valve. / · OA - Kill weight fluid, tested annulus and annular valve. E-37A Permit to Drill Version 1.0 Page 11 ~ '( NOTES: PERFORATION ACROSS LINER ð 1!:!l10817' AND UP 7-5/8" CSG. HORIZONTAL COMPLETION. . TREE = VYELLHEA D = ACTUA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVD = CNV FMC BAKER 64.1' 29' 1933' 101 @ 11948' 10465' 8800' SS E-37 Current 2205' 1-14-112" HES SSSV LANDING NIP, ID = 3.813" . ~ ~ 10-3/4" CSG, 45.5#, NT-80, ID = 9.953" - 3798' GAS LIFT MANDRELS ST MD TVD DEV TYÆ VLV LATCH 2 5326 4784 36 CAM DMY BK 1 7036 6149 37 CAM DMY BK PORT DA TE 03/03/04 03/03/04 Calculated TOC Values Gauge hole = - 5,825' 50% Washout = -7,834' L e. {;--i~ ~ I,~:, ._.'.It_ I; , I xx Plug installed Minimum IC = 3.725 @ 9843' 4-1/2" HES XN NIPPLE ;-~-' '. .~ .J ~ '~ I 1.:,,:' . 1-4-1/2" HES X NIP, ID = 3.813" I 1-17-5/8" X 4-1/2" BKR SABL-3 PKR, ID = 3.875" 9787' " 9799' ',. ,;g. -4-1/2" HES X NIP, 10 = 3.813" I Þ >It , 9822' .it ~~ -'I .. -~) 9843' -4-1/2" HES XN NIP, ID = 3.725" I , 9855' I {i Ii ~? -- -;; I , ..~ t I -4-1/2" WLEG I I- ELMD TT LOGGED 12/31/95 9855' 9862' 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" - Ii';" >04' ~ ~ I TOP OF 5-1/2" LNR - 10817' 7-5/8" CSG, 29.7#, S-95, ID = 6.875" - 10952' PERFORA TION SUMMARY RB= LOG: MWDlGR ON 07/95 ANGLEAT TOP PERF: 64 @ 10630' Note: Refer to A"oduction DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 3-3/8" 4 10630 - 10670 0 09/06/02 3-3/8" 4 10680 - 10695 0 09/05/02 3-3/8" 4 10715 - 10735 0 09/05/02 3-3/8" 4 10750 - 1080~ 0 08/04/95 3-3/8" 4 10990 - 11080 0 08/04/95 3-3/8" 4 11170 - 11350 \ l\. 0 08/04/95 3-3/8" 4 11510 - 11560 0 08/04/95 3-3/8" 4 11650 - 11700 ) C 07/29/00 3-3/8" 411790-11850 C 07/29/00 3-3/8" 4 12010 - 122007 C 07/29/00 3-3/8" 4 12280 - 12389 }Õ C 07/29/00 11600' 1-13-3/8" BAKERIBP I 11920' - 3-3/8" BAKER IBP I 12379' -BKRIBP I PBTD -i 12379' 5-1/2" LNR, 17#, L-80, .0232 bpf, 10 = 4.892" l-i 12512' I PRUDHOE BA Y UNIT WELL: 6037 PERMIT No: 1950950 API No: 50-029-22571-00 SEe 6, T11N, R14E, 3391' FSL & 881' FEL DA TE REV BY COMrvENTS 03/17/04 ANYITLP PERF CORRECTIONS DATE 08/04195 08/10/01 09/05/02 07/12/03 09/17/03 03/03/04 REV BY COMMS\ITS ORIGINAL HORlZ COM PLET RNlRP CORRECTIONS CWSltlh ADD PERFS CMOITLP KB ELEVATION CORRECTION CMOITLP PERF ANGLE CORRECTION RMHITLP GL V C/O BP Exploration (Alaska) TREE = . W8..LHEAD = AèTUA TOR = KB. B-E:V = BF. B-E:V = KOP= Max Angle = Datum fvD = Datum TVD ::: 6" em FMC Baker 64.1' 28.5 1933' 101 @ 11,984' 10465' 8800' 55 . E-37 Pre-rig Ie CTYNOTES: Minimum ID = 3.725" @ 9843' 4112" HES XN NIPPLE 10-3/4" CSG, 45.5#, NT-80, 10 = 9.953'1-1 3798' 1 ~ Calculated TOC Values Gauge hole = - 5,825' 50% Washout = -7,834' Pre-Rig Chemical Cut -9,791' Cut in top of pup just above K-Anchor 4-1/2" HES CIBP - 9809' f 4-1/2" TBG, 12.6.#, L-80, .0152 bpf, ID = 3.958" 1-1 9855' 1·~8· CSG, 29~' ::~ ~:.:~ ::::: 1;1 PERFORA TION SUMMARY REF LOG: MWD/GR ON 07/95 ANGLE AT TOP PERF: 64 @ 10630' Note: Refer to Production DB for historical perf data SIZE 5PF INTffiV AL Opn/Sqz DA TE 3 3/8" 4 10630-10670 0 09/06/02 3 3/8" 4 10680-10695 0 09/05/02 33/8" 4 10715-10735 0 09/05/02 3 3/8" 4 10750-10800 0 08/04/95 3 3/8" 4 10990-11080 0 08/04/95 3 3/8" 4 11170-11350 0 08/04/95 33/8" 4 11510-11560 0 08/04/95 3 3/8" 4 11650-11700 C 07/29/00 3 3/8" 4 11790-11850 C 07/29/00 33/8" 4 12010-12200 C 07/29/00 3 3/8" 4 12280-12389 C 07/29/00 2205' H 4-1/2" HES SSSV Landing Nip, 10=3.813" l GAS LFT MANDR8..s DEV TYPE VLV LATCH 36 CAM DMY BK 37 CAM DMY BK PORT DA TE 03/03/04 3/3/2004 ST MD 2 5326 1 7036 TVO 4784 6149 ~ ¡"',",-' 9787' H 4 1/2" HES X NIP, 10=3.813" ...;.~~~ .. - "'v-. :-..,.. ! -'1 V-"".. . *"5 ....~ ~~" I ~ ~.·.I 1 ~ .. I I I 9799' H 75/8" X 4 1/2" BKR SABL-3 PKR ID 3.875" 9822' H 41/2" HES X NIP, 10=3.813" I 9843' H 4 1/2" HES XN NIP, 10=3.725" I 9855' -f 41/2" WLEG 9862' H 8.. MO TT LOGGED 12/31/95 I . " 4 Þ !t~ .~ 11600' 1-1 3 3/8" BKR IBP 11920' H 33/8" BKR IBP 12379' H BKR IBP I I PBTD H 12379' I 5 112" LNR, 17#, L-80, .0232 bpf, 10 = 4.892" H DA TE REV BY COMMENTS 03/17/04 ANYITLP Perf Corrections 11/08/04 KWA Pre-rig work for Sidetrack DATE 08/04/95 08/1 % 1 09/05/02 07/12/03 09/17/03 03/03/04 REV BY COMMENTS Original Horizonatal Completion RN/RP Corrections CWSItIh Add Perfs CMOITLP KB 8evation Correction RMH!TLP Perf Angle Correction TJS GLV C/O PRUDHOE BA Y UNIT WELL: E-37 PffiMIT No: XXX-XXXX API No: 50-029-22571-00 SEC6, T11N, R14E3391' FSL & 881' FEL BP Exploration (Alaska) TREE = ' WB.LHEAD = ACTUATOR = KB. B.EV = BF. B.EV = KOP == Max Angle = Datum t.D = Datum TVD = 6"CfN FMC Baker 64.1' 28.5 1933' 101 @ 11,984' 10465' 8800' SS . E-37 P&A . / 110-3/4" CSG, 45.5#, NT-80, ID = 9.953"1-1 3798' I ~ , Calculated TOC Values Gauge hole = - 5,825' 50% Washout = - 7,834' TOP 5 1/2" LNR 1-1 10817' 7-5/8" CSG, 29.7#, S-95, ID = 6.875"" 10952' Tail Pipe left in the hole consisting of the following: 7-5/8" x 4-112" BKR SABL-3 PKR, ID=3.875" 4-1/2" HES CIBP 4-1/2" HES X Nip, ID=3.813" 4-1/2" HES XN Nip, ID=3.725" 4-1/2" WLEG PERFORA TION SUMMARY REF LOG: MWDlGR ON 07/95 ANGLE AT TOP PERF: 64 @ 10630' Note: Refer to A'oduction DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 3 3/8" 4 10630-10670 0 09/06/02 3 3/8" 4 10680-10695 0 09/05/02 33/8" 4 10715-10735 0 09/05/02 3 3/8" 4 10750-10800 0 08/04/95 3 3/8" 4 10990-11080 0 08/04/95 3 3/8" 4 11170-11350 0 08/04/95 33/8" 4 11510-11560 0 08/04/95 33/8" 4 11650-11700 C 07/29/00 33/8" 4 11790-11850 C 07/29/00 33/8" 4 12010-12200 C 07/29/00 33/8" 4 12280-12389 C 07/29/00 I 5 1/2" LNR, 17#, L-80, .0232 bpf, ID = 4.892" 1-1 DATE REV BY COMMENTS 03/17/04 ANYITLP Perf Corrections 11/08/04 KWA A'e-rig work for Sidetrack 11600' I., 3 3/8" BKR IBP 11920' I., 33/8" BKR IBP 12379' 1-1 BKR IBP I PBTD -f 12379' DATE 08/04/95 08/10/01 09/05/02 07/12/03 09/17/03 03/03/04 REV BY COMMENTS Original Horizonatal Completion RNIRP Corrections CWSltlh Add Perfs CMOITLP KB 8evation Correction RMHITLP Perf Angle Correction TJS GLV C/O PRUDHOE BA Y UNIT WB.L: 60037 ~IT No: XXX-XXXX API No: 50-029-22571-00 SEC 6, T11N, R14E3391' FSL & 881' FB. BP Exploration (Alaska) iREE = ' WB.LHEAQ = ACTUATOR = KB. ELEV = SF. ELEV = KOP= Max Angle = Datum ~ = Datum TVD = . E-37 A Proposed Completion ~ 4-1/2"12.6#, 13CrTBG, ID = 3.958' HES 4-1/2" X Nipple ID = 3.813" 110-3/4" CSG, 45.5#, NT-80, ID = 9.953"1-1 3798' I ~ L GAS LIFT MANDRELS ST ~ TVD DEV TYPE VLV LATCH PORT DATE 4 ~ ~ 1 Calculated TOC Values Gauge hole = - 5,825' 50% Washout = -7,834' TOP 5 1/2" LNR 1-1 10817' 7-5/8" CSG, 29.7#, S-95, ID = 6.875"" 10952' Top of Whipstock -10,218' HES 4-1/2" X Nipple 10 = 3.813" BKR 7-5/8" x 4-1/2" PKR HES 4-1/2" X Nipple 10 = 3.813" HES 4-1/2" XN Nipple 10 = 3.725" 4-1/2" WLEG Tail Pipe left In the hole consisting of the following: 7-5/8" x 4-1/2" BKR SABl-3 PKR, 10=3.875" 4-1/2" HES CIBP 4-1/2" HES X Nip, 10=3.813" 4-1/2" HES XN Nip, ID=3.725" 4-1/2" WlEG i I "'~""~:~/'i..af PBTD - 12,848' 4-1/2" Solid LNR, 12.6#, L-80 - 12,948' /' 11600' 1-1 3 3/8" BKR IBP 11920' 1-1 3 3/8" BKR IBP I 12379' 1-1 BKR IBP I PBTD -t 12379' 151/2" LNR, 17#, L-80, .0232 bpf, ID = 4.892"1-1 12512' I DATE 08/04/95 08/10/01 09/05/02 07/12/03 09/17/03 03/03/04 REV BY COMMENTS Original Horizonatal Completion RN/RP Corrections CWSltlh Add Perfs CMOITLP KB 8evation Correction RMH/TLP Perf Angle Correction TJS GLV C/O DATE REV BY COMMENTS 03/17/04 ANYITLP Perf Corrections 11/08/04 KWA Pre-rig work for Sidetrack PRUDHOE BA Y UNIT WELL: &37A PERMIT No: XXX-XXXX API No: 50-029-22571-01 SEC 6, T11N, R14E3391' FSL & 881' FEL BP exploration (Alaska) ~ 1. DATE OF SURVEY MAY 29, 1995. 2. REFERENCE FIELD BOOK WOA 95-02 (pgs. 31-35). 3. ALASKA STATE PLANE COORDINATES . ARE ZONE 4. ALASKA, NAD27. 4. EXISTING WELL LOCATIONS FROM AERIAL PHOTOGRAPHY, U.N.O.. 5. ELEVATIONS ARE BPX DATUM (M.S.L). 6. AVERAGE PAD SCALE FACTOR: 0.9999310. 7. HORIZONATAL/VERTlCAL CONTROL IS IS BASED ON E PAD MONUMENTS E-2, E-3, E-4, E-5 AND E-6. . . I r J ¡ -.!'_1_2N'~_R'1~_~___~_ __ __ _.______33t__+__~~~.31j¿~~.3~__ T.11N., R.14E. 7 I SEC.6 r SEC.5 .8 . .3<1 ~ It) ¡.... \'I ~ I- £:) Z iE :5 <.:J a. .9 .,0 .11 .12 .31 .,3 .14 E PAD .,S ·3 .4 .3S ·1 ·S .6 .26 ·2 ìi -~- I 33- 21 - 29· 36- 20- 28· 27. '~37 .16 :~ . .17 ·24 ·23 . ~~ 39-f I c:= ~ --.J ·f - . .) l LEGEND -+ AS-BUILT WELLS . EXISTING WELLS LOCATED WITHIN PROTRACTED SEC. 6, T. 11 N., R. 14 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS 37 Y= 5,975,167.41 N. 1965.93 70'20'18.529" 70.3384803' 29.0' 3391' FSL X= 664,107.51 E. 1619.44 148'40'05.978" 149.6683272' 881' FEL Y=5,975,142.24 N. 1,931.02 70'20'18.199" 70.3383886' 3358' FSL 39 X= 664,488.60 E. 1,999.79 148'39'54.865" 148.6652403' 30.5 501' FEL LOCATED WITHIN PROTRACTED SEC. 31, T. 12 N., R. 14 E., UMIAT MERIDIAN, ALASKA SECTION OFFSETS 12' FSL 501' ÆL WELL A.S.P. NO. COORDINA TES 38 Y=5,977,074.95 x= 664,439.90 PLANT COORDINA TES N. 3864.47 E. 2000.50 GEODETIC GEODETIC POSITION(DMS) POSITION(D.DD) 70'20'37.214" 70.3436706' 148'39'55.049" 148.6652914' CELLAR BOX ELEV. 30.8' - it 1~o DA....¥It\I: BARNHART CHEOŒD: F"EN11E DA 1[: 5/30/95 DftA"NG: EPADAB JOB NO: . BP EXPLORATION 31 32 THIS SURVEY 5 ~~ ~C-~:x~ ;""" ,,,," /'i"/" E PAD VICINITY MAP N.T.S. SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MAY 29. 1995. SHEET' SCALE: E PAD CONDUCTOR AS-BUILT WELLS 37, 38 & 39 1 Œ 1 1 7/12/95 RE1IISED GEODE11C POSITION ON YOEu. 39 o 5/30/95 ORIGINAl. AS-tIULT ISSUE ~ O~ Æ_ON JJ Rf"A 18 .- BY 01K _.......1LII'C'IaIS _ 'CSt' .-.aD I.M( -......- 1"-500' r: :;;'\ ~ .,... C\I r¡ " ~ '"' WEll PRODUCER WEll INJECTOR ~ IDATE:1 SCALE: 1" ::= 300' 1 MAP DATE: 2000 I - E b$14495.dgn COMPANY PETA!LS ~ErERENCE INFORMATJON SURVEY PRO{ iRMj rn..,N'>r¡¡ D':plh I'm Deptb Tn Survcy!!'laJ) J()1!K{JiJ 12')<17.67 P!¡¡umx!: E.:nA wp04 VJ4 Che-cked Plan:E<17A wp04 (E-37iPhm E-37A) Date BP AmDCÚ rÜ<:J! Revicwi.-rl: Creat(.<tl B::i' Dígita! BusincssClkm Uscr Date: J!JX!2004 Date" TARGET DETAILS TVO +N/-S +E/-W Nörthing Easting Shape 8929.50 -3060.00 -3950.00 5972021.91 660225.69 Point -6208.72 5972095.00 657965.00 Point -5785.00 597211 !.71 658388.4 1 Point -5300.00 5972186.84 658871.85 Point -4250.00 5972085.32 65992425 Point MW!h!Fk;-M5 FORMA nON TOP DETAILS WELL DETAILS No. TVDPath MDPath Formation N¡¡m~' ;Ni," q--¿i_W Nl>!thiug !';¡,slÍug L-atitude Lougitlli!<.' SIDI E-:n EJ72.21 16¡ L17 _~97~j(,7.41 ú64W75] 70~20'lg.52')N 14W'4(rHS.97ßW MiA 8929.50 1065753 TZ]B CASING DETA]lS N3ITIe No. TVD Name Size E-37A T! TZI TO MO 8967.51 12947.00 4 1/2" 4.500 landing SECTION DETAilS See MO Inc Az; TVO +N/-S +EJ-W DLeg TFace I 0.00 0.00 2 12.00 78,00 3 12.00 78.75 4 0.00 0.00 5 12.00 0.30 6 12.00 2.52 7 0,00 0.00 8 12.00 -9.80 9 ]2.00 -84.34 10 0.00 0.00 11 6.00 -83.36 ]2 6.00 ,80.08 13 0.00 0.00 14 4.00 105,03 15 4,00 98.48 16 0.00 0.00 8400 ]" "" <:> <:> C1 "'" 15- ~ " " 'E .;; 8700 '" " ;:: 9000 VSec Target E-37 A TJ TZI E-37A T! landing E-37A T2 E-37A T3 E-37A T4 TO COMl'ANY DilIA-ItS ßPAIJ\Q1..v -2400 E ¢: '" '" r2 + :E 1:: o ~ -3000 :a' -S o (f) SURVEY PROGRAM Pla!i: [Q7Awp04 (E·:níPhmE-37AJ hue' North Uc'pth Fm Dep!h T" Surv,,-'yiP!:m fun! cn.~,1tcd By: nigíta.! BI,L..¡ine&;C!icnt U~r Da.i\.:: I !/I8i2004 !H2HtŒJ P!am~d: E<17A wp(¡4 V34 MWDi-tFR;MS t1¡¡;:ck;;;d: Nauw 'EI_W ¡:iJ~1i1!g Nürúlwg LtÚluJe L(1ngÌlude ~!,,¡ CASING DETAILS !97211 1611.77 5~75j67Al 6ú4Jf!75! 70"2¡¡'HL$2<jN J4&~4()'05.91¡¡W N/A No. TVD TARGET DETAILS MD Name Size 8967.5 I 12947.00 4 1/2" Name TVD +N/-S +E/-W Northing Easting Shape -3060.00 5972021.91 Point -2937.44 5972095.00 Point -2930.00 5972111.71 Point -2865.47 5972 1 86.84 PoiOl -3106. J 7 5971972.00 Polygon -2990.00 5972085.32 Point SECTION TVD +N/-S +E/·W D1.èg TF ace VSec Target 4.500 TOP DEl' AI1.S No. TVDPath MDPath Formation 8929.50 10657.53 TZI8 See MD Ine I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 E-37A 1'1 TZI E-37A 1'1 landing E-37A T2 E-37A T3 E-37A T4TD . BP-GDB BP Planning Report . Plan: E-37 A wp04 Date Composed: Version: Tied-to: 10/29/2004 34 From: Definitive Path Principal: Yes Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre bggm2004 Site: PB E Pad TR-11-14 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5973160.88 ft 662538.97 ft Latitude: 70 19 Longitude: 148 40 North Reference: Grid Convergence: 59.134 N 53.054 W True 1.24 deg WeD: E-37 Slot Name: E-37 Well Position: +N/-S 1972.21 ft Northing: 5975167.41 ft Latitude: +E/-W 1611.77 ft Easting: 664107.51 ft Longitude: Position Uncertainty: 0.00 ft 70 20 18.529 N 148 40 5.978 W Casing Points 12947.00 8967.51 4.500 6.125 4 1/2" Formations 0.00 TJD 0.00 0.00 0.00 TJC 0.00 0.00 0.00 TJB 0.00 0.00 0.00 TJA 0.00 0.00 0.00 TSAG 0.00 0.00 0.00 TSAD 0.00 0.00 0.00 TCGL 0.00 0.00 0.00 BCGL 0.00 0.00 10657.53 8929.50 TZ1B 0.00 0.00 0.00 BSAD 0.00 0.00 Targets E-37A T1 TZ1 8929.50 -3060.00 -3950.00 5972021.91 660225.69 70 19 48.424 N 148 42 1.301 W E-37A T4 TD 8967.50 -2937.44 -6208.72 5972095.00 657965.00 70 19 49.614 N 148 43 7.250 W E-37 A T3 8974.50 -2930.00 -5785.00 5972111.71 658388.41 70 19 49.690 N 148 42 54.879 W E-37A T2 8994.50 -2865.47 -5300.00 5972186.84 658871.85 70 19 50.329 N 148 42 40.720 W E-37 A Poly 9001.50 -3106.17 -4121.76 5971972.00 660055.00 70 19 47.969 N 148 42 6.315 W -Potygon 1 9001.50 -3167.72 -4143.12 5971910.00 660035.00 70 19 47.363 N 148 42 6.938 W -Polygon 2 9001.50 -3040.63 -4465.44 5972030.00 659710.00 70 19 48.611 N 148 42 16.350 W -Polygon 3 9001.50 -2934.66 -5193.34 5972120.00 658980.00 70 19 49.649 N 148 42 37.604 W -Polygon 4 9001.50 -2996.44 -5569.81 5972050.00 658605.00 70 19 49.038 N 148 42 48.594 W -Polygon 5 9001.50 -3007.32 -6215.25 5972025.00 657960.00 70 19 48.927 N 148 43 7.438 W -Potygon 6 9001.50 -2852.35 -6211.85 5972180.00 657960.00 70 19 50.451 N 148 43 7.343 W -Polygon 7 9001.50 -2868.51 -5702.05 5972175.00 658470.00 70 19 50.296 N 148 42 52.458 W -Polygon 8 9001.50 -2773.38 -5249.83 5972280.00 658920.00 70 19 51.235 N 148 42 39.257 W . BP-GDB BP Planning Report . Targets -Polygon 9 9001.50 -2856.97 -4401.40 5972215.00 659770.00 70 19 50.418 N 148 42 14.484 W -Polygon 10 9001.50 -2954.18 -4073.42 5972125.00 660100.00 70 19 49.464 N 148 42 4.906 W E-37 A T1 landing 9002.50 -2990.00 -4250.00 5972085.32 659924.25 70 19 49.110 N 148 42 10.061 W Plan Section Information 10218.00 51.04 243.59 8705.08 -3068.50 -3583.38 0.00 0.00 0.00 0.00 10238.00 51.58 246.59 8717.59 -3075.07 -3597.54 12.00 2.69 14.98 78.00 10516.89 64.28 283.48 8869.10 -3089.61 -3826.51 12.00 4.55 13.23 78.75 10631.57 64.28 283.48 8918.87 -3065.53 -3926.98 0.00 0.00 0.00 0.00 10657.53 67.39 283.50 8929.50 -3060.00 -3950.00 12.00 12.00 0.07 0.30 E-37A T1 TZ1 10709.60 73.63 283.79 8946.86 -3048.43 -3997.68 12.00 11.99 0.55 2.52 10837.38 73.63 283.79 8982.87 -3019.21 -4116.75 0.00 0.00 0.00 0.00 10975.69 90.00 281.00 9002.50 -2990.00 -4250.00 12.00 11.84 -2.01 -9.80 E-37 A T1 landing 11004.93 90.35 277.51 9002.41 -2985.30 -4278.86 12.00 1.18 -11.94 -84.34 11865.99 90.35 277.51 8997.21 -2872.80 -5132.53 0.00 0.00 0.00 0.00 12033.87 91.50 267.50 8994.50 -2865.47 -5300.00 6.00 0.69 -5.96 -83.36 E-37 A T2 12137.64 92.56 261.36 8990.82 -2875.53 -5403.17 6.00 1.02 -5.92 -80.08 12421.82 92.56 261.36 8978.11 -2918.17 -5683.84 0.00 0.00 0.00 0.00 12523.75 91.50 265.30 8974.50 -2930.00 -5785.00 4.00 -1.04 3.86 105.03 E-37A T3 12630.56 90.87 269.53 8972.29 -2934.82 -5891.65 4.00 -0.59 3.96 98.48 12947.67 90.87 269.53 8967.50 -2937.44 -6208.72 0.00 0.00 0.00 0.00 E-37A T4 TD Survey 10218.00 51.04 243.59 8705.08 8647.58 -3068.50 -3583.38 0.00 5972021.44 660592.39 MWD+IFR+MS 10238.00 51.58 246.59 8717.59 8660.09 -3075.07 -3597.54 12.00 5972014.56 660578.38 MWD+IFR+MS 10300.00 53.39 255.69 8755.39 8697.89 -3090.90 -3644.00 12.00 5971997.72 660532.27 MWD+IFR+MS 10400.00 57.65 269.32 8812.17 8754.67 -3101.36 -3725.43 12.00 5971985.48 660451.10 MWD+IFR+MS 10500.00 63.23 281.55 8861.63 8804.13 -3092.90 -3811.72 12.00 5971992.05 660364.65 MWD+IFR+MS 10516.89 64.28 283.48 8869.10 8811.60 -3089.61 -3826.51 12.00 5971995.01 660349.80 MWD+IFR+MS 10600.00 64.28 283.48 8905.17 8847.67 -3072. 16 -3899.32 0.00 5972010.87 660276.63 MWD+IFR+MS 10631.57 64.28 283.48 8918.87 8861.37 -3065.53 -3926.98 0.00 5972016.89 660248.83 MWD+IFR+MS 10657.53 67.39 283.50 8929.50 8872.00 -3060.00 -3950.00 12.00 5972021.91 660225.69 E-37A T1 TZ1 10700.00 72.48 283.73 8944.07 8886.57 -3050.61 -3988.76 12.00 5972030.45 660186.74 MWD+IFR+MS 10709.60 73.63 283.79 8946.86 8889.36 -3048.43 -3997.68 11.99 5972032.44 660177.78 MWD+IFR+MS 10800.00 73.63 283.79 8972.34 8914.84 -3027.76 -4081.92 0.00 5972051.26 660093.12 MWD+IFR+MS 10837.38 73.63 283.79 8982.87 8925.37 -3019.21 -4116.75 0.00 5972059.04 660058.11 MWD+IFR+MS 10900.00 81.04 282.50 8996.59 8939.09 -3005.34 -4176.20 12.00 5972071.60 659998.37 MWD+IFR+MS 10975.69 90.00 281.00 9002.50 8945.00 -2990.00 -4250.00 12.00 5972085.32 659924.25 E-37 A T1 landin 11000.00 90.29 278.10 9002.44 8944.94 -2985.97 -4273.98 12.00 5972088.83 659900.20 MWD+IFR+MS 11004.93 90.35 277.51 9002.41 8944.91 -2985.30 -4278.86 12.00 5972089.39 659895.30 MWD+IFR+MS 11100.00 90.35 277.51 9001.84 8944.34 -2972.88 -4373.12 0.00 5972099.75 659800.81 MWD+IFR+MS 11200.00 90.35 277.51 9001.23 8943.73 -2959.81 -4472.26 0.00 5972110.64 659701.41 MWD+IFR+MS 11300.00 90.35 277.51 9000.63 8943.13 -2946.75 -4571.40 0.00 5972121.53 659602.01 MWD+IFR+MS 11400.00 90.35 277.51 9000.03 8942.53 -2933.68 -4670.54 0.00 5972132.42 659502.62 MWD+IFR+MS 11500.00 90.35 277.51 8999.42 8941.92 -2920.61 -4769.68 0.00 5972143.32 659403.22 MWD+IFR+MS 11600.00 90.35 277.51 8998.82 8941.32 -2907.55 -4868.82 0.00 5972154.21 659303.82 MWD+IFR+MS 11700.00 90.35 277.51 8998.21 8940.71 -2894.48 -4967.96 0.00 5972165.10 659204.43 MWD+IFR+MS 11800.00 90.35 277.51 8997.61 8940.11 -2881.42 -5067.10 0.00 5972175.99 659105.03 MWD+IFR+MS 11865.99 90.35 277.51 8997.21 8939.71 -2872.80 -5132.53 0.00 5972183.18 659039.44 MWD+IFR+MS 11900.00 90.58 275.48 8996.94 8939.44 -2868.95 -5166.31 6.00 5972186.28 659005.58 MWD+IFR+MS . BP-GDB BP Planning Report . Survey 12000.00 91.27 269.52 8995.32 8937.82 -2864.59 -5266.16 6.00 5972188.46 658905.67 MWD+IFR+MS 12033.87 91.50 267.50 8994.50 8937.00 -2865.47 -5300.00 6.00 5972186.84 658871.85 E-37 A T2 12100.00 92.18 263.59 8992.38 8934.88 -2870.60 -5365.89 6.00 5972180.26 658806.10 MWD+IFR+MS 12137.64 92.56 261.36 8990.82 8933.32 -2875.53 -5403.17 6.00 5972174.52 658768.94 MWD+IFR+MS 12200.00 92.56 261.36 8988.03 8930.53 -2884.89 -5464.76 0.00 5972163.82 658707.57 MWD+IFR+MS 12300.00 92.56 261.36 8983.56 8926.06 -2899.89 -5563.53 0.00 5972146.66 658609.16 MWD+IFR+MS 12400.00 92.56 261.36 8979.09 8921.59 -2914.90 -5662.29 0.00 5972129.50 658510.76 MWD+IFR+MS 12421.82 92.56 261.36 8978.11 8920.61 -2918.17 -5683.84 0.00 5972125.75 658489.29 MWD+IFR+MS 12500.00 91.75 264.38 8975.17 8917.67 -2927.87 -5761.36 4.00 5972114.36 658412.01 MWD+IFR+MS 12523.75 91.50 265.30 8974.50 8917.00 -2930.00 -5785.00 4.00 5972111.71 658388.41 E-37 A T3 12600.00 91.05 268.32 8972.80 8915.30 -2934.24 -5861.10 4.00 5972105.81 658312.43 MWD+IFR+MS 12630.56 90.87 269.53 8972.29 8914.79 -2934.82 -5891.65 4.00 5972104.56 658281.91 MWD+IFR+MS 12700.00 90.87 269.53 8971.24 8913.74 -2935.39 -5961.08 0.00 5972102.47 658212.51 MWD+IFR+MS 12800.00 90.87 269.53 8969.73 8912.23 -2936.22 -6061.07 0.00 5972099.45 658112.57 MWD+IFR+MS 12900.00 90.87 269.53 8968.22 8910.72 -2937.05 -6161.05 0.00 5972096.44 658012.63 MWD+IFR+MS 12947.00 90.87 269.53 8967.51 8910.01 -2937.44 -6208.05 0.00 5972095.02 657965.66 41/2" 12947.67 90.87 269.53 8967.50 8910.00 -2937.44 -6208.72 0.00 5972095.00 657965.00 E-37A T4 TD TERRIEL. HUBBLE BP EXPLORATION AKINC POBOX19G612 MB 7-5 ANCHORAGI:,AK 99519-.6612 89-6/1252 170 "MaStercard Check" DATE \~/?i)/o(-( ,$ ICD.Œ> ~;J:/.~~ttf~cc First National B~nkAlaska Anchora.ge..,. f\K....9.9. 50'2..:' ".. ... ... '..<-/). .. .. ..)J.J .... ..... f)#JßA.· MEMO 5 37A --te/V \L{#T. ~¡U~ DOLLARS I:~ 25 2000GOI:qq·~.....q;2 2711. ~55GII· O~70 . . . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRlA TE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /#á ~ 37A PTD# ;:206-- 002- X Development Service CHECKWßAT APPLIÈS ADD-ONS (OPTIONS) MULTI LATERAL (If API Dum ber last two. (2) digits are between 60-69) Exploration Stratigraphic ~'CLUE n. Tbe permit is for a Dew wellboresegment of existing well,. . Permit No, .' API No. ProductioD. sbould continue to be reponed as a function' of tbe original API number. stated above. . HOLE In accordance witb' 20 AAC 25.005(1), aJl records, data and logs acquired .for tbe pilot bole must be clearly differentiated In botb name (name on permit plus PH) and API Dum ber (50 70/80) from records, data and logs acquired for well (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Tbe permit is approved subject ·to fuU compliance witb 20 AAC 25..0SS~ Approval to perforate and produce is contingent upon issuance of ~ conservation order approving a spacing excep1ion. (CompanY Name) assumes tbe liability of any protest to tbe spacing .exception tbat may occur. AU dry ditcb sample sets submitted to tbe Commission must be in no greater 1han 30' sample intervals from below tbe permafrost or from wbere samples are first caught aDd ] 0' sample iIiter:va)s through target zones. PTD#: 2050020 Administration Well bore seg Annular Disposal D D Appr Date RPC 1/4/2005 Engineering Appr Date WGA 1/4/2005 Geology Appr RPC Geologic Commissioner: j)rs Date 1/4/2005 Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT E-37A Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV /1-0IL GeoArea 890 Unit 11650 1 P_ermit fee attache_d _ _ _ . . . _ . _ _ 'y_es _ _ . _ _ . . _ _ _ _ . . _ _ _ _ _ . _ . 2 _Lease_n\,Jmberappropri.<ite_ _ _ _ _ . _ _ . _ _ _ _ _ _ . _ . Yes . _ _ _ . _ . _ _ _ . . . _ _ _ _ . _ . _ _ _ . . _ _ _ _ _ . _ . _ _ _ _ _ _ . _ _ _ _ . _ 3 _U_nlq\,Je welln_a!11~_and rll.!mb.er . . . . . . . . . . _ _ _ . _ . . . _ _ . . _ _ . _ _ _ _ _ _ . . . _ . . . 'y_es _ _ _ _ _ . _ . . _ . . . _ . _ . . . _ . . _ _ _ . _ _ _ _ . _ . . . _ _ _ . . _ _ _ _ _ _ . _ . _ . . . _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ 4 WeUIQC<lted in.a.define_d_pool. _ _ _ _ . . . _ _ _ . _ . _ . _ . _ . . _ . Yes _ _ . _ . . . _ _ _ . . _ . _ _ _ _ . . . _ _ _ . . _ 5 WelUQC<lted pr.oper _distance. from driJling \,Jnit bO\,Jnd_a[)'. _ _ . _ . _ . _ Yes _ _ _ _ . . _ . _ _ . . _ . _ _ _ . . . . _ _ _ _ . . . 6 WeU IQC<lted proper .dlstance from other welJs . _ . _ . . . . _ _ _ yes . _ _ . . . . _ _ _ _ _ . _ _ _ . . _ _ _ _ _ _ . . _ . . . . _ _ _ _ . . . _ 7 .Sufficienlacreage_ayail.<ible in.dJiUillg unJI . _ _ _ _ _ . _ _ _ _ _ . . _ . Yes _ _ _ _ _ _ .. _ _ . . _ . _ 8 If.d~viated, .Is. weJlbQre platincJu.ded . _ _ . . . . _ yes _ _ _ _ . . _ _ _ _ . . . . 9 .Qperator ()f1ly affected party _ . . . _ _ _ _ . . . _ _ _ . . . . yes _ . . . . . . _ _ _ . _ _ _ _ . _ . . . 10 _Qperator !:Ias.apprppriate_ bond inJorce . . _ _ _ _ _ _ . _ . _ _ _ _ . . . _ _ _ . _ _ _ _ _ _ _ _ . . . Yes _ _ _ _ _ . . _ . . . . _ . _ _ _ . _ _ _ _ _ _ . _ _ . . _ _ _ _ _ _ _ . . . . . . . . _ _ _ _ _ . _ _ _ _ _ . . _ . . . _ _ _ _ _ _ _ . . . . . _ _ 11 P_ermit œn be issued wJthQut co.nservation order _ _ _ . . . _ . _ _ _ . . . Yes . _ . . . _ _ _ _ . . _ . . _ _ _ . . . . 12 .Permit œn be issued wJthQut administratille a-pprpvaL _ . _ _ . . . . . _ _ _ . _ . . _ _ _ Yes _ _ _ . . . _ . _ _ _ _ _ . . . . _ _ _ . . _ _ _ _ . . _ _ 13 Can permit be approved before 15-day wait Yes 14 WelUQC<lted within area al1d.str¡¡t.<ia\,Jthorized by Injectioll Order # (p\,JUO# jn_c.o!11!11.entsUFor. .NA _ _ . . . _ _ _ _ . _ . . 15 .AJI welJs.Withtn.1l4_mite_area_of reyiew jd~ntified (Fpr sefVJ~-,^,-ell only). _ _ . _ _ . _ _ _ _ _ _ . . .NA _ . _ _ _ . . . _ . . . . . _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ . . _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ 16 PJe-produced injector; _d\,Jr.<itiQn.of pre--pro.d\,Jctioll less thal13 mOl1ths. (For.seJ'Vtce welt only). NA _ . . . _ . _ . _ . _ . _ . . . . . _ _ . . . . _ . _ _ _ _ . . . 17 ACMP_ F:il1dingof Consistency has bee.n.iss\,Jed for.this project. . . . _ _ . _ . . . _ _ _ . . . . . _NA . _ . _ _ _ . . . _ _ _ _ . . _ . _ . . _ _ . . . _ _ . _ _ _ . . _ _ _ _ . . . _ . . . . _ . . _ _ _ . . _ 18 .C_onductor st(il1gpJovided . _. _ _ . . .. . _ _ _ . . . . _ _ _ _ . . . . _NA . . _ _ _ . . . _ _ _ _ . . . . _ . _ . . . _ _ _ _ . . _ _ _ _ . . . . _ _ _ . . _ _ 19 _S_urfacec¡¡sin9-protect!H!ltknowl1 USDWs _ _ _ _ . . . _ _ _ _ . . . . _ _ _ _ . . _ . _ _ NA _ _ _ _ . . . _ _ _ _ . . . . _ _ . . . _ _ _ _ . . . _ _ _ _ . . . . 20 _CMT. v.ol. adequate to circ.ulate oncond.uctor & su.rf. C$g _ . _ _ _ _ _ . _ _ _ _ . . . _ _ _ . .NA _ _ _ . . . _ _ _ _ _ _ . _ _ . _ _ . . _ . _ _ _ . . _ _ _ _ _ _ . _ 21 .CMT. vol. adeQu.ate.to tie-inlQn9string to.s\,Jrf CS9- _ . . . _ _ _ _ . . . . _ _ _ . . . _ . _ _NA _ . _ _ _ . . _ _ _ . . . _ _ _ _ . . . _ _ _ _ _. _ _ _ _ . _ _ _ _ . . . _ . _ . _ . _ . _ _ _ . . . 22 _CMT. wilt coyer_all !<nQw.nprQd\,Jc!iye hQrizons_ . . _ _ _ _ _ . . . _ _ _ _ . . _ . _ _ . .Y~s _ _ . . . . . _ _ _ _ . . . _ _ _ _ . . . _ _ . . . . 23 _C_asing designs adetlua_te [or C,.T, B&permafros!. _ _ . . . _ . _ Yes _ _ _ _ . . . . _ 24 Adequ.<iteJankage_ Qr re.seIYe pit _ _ _ _ . . . . . _ _ _ . . . . _ _ _ _ _ . . . _ _ _ yes _ . Nab.ors.7.ES. _ _ _ . . _ _ _ _ _ . . . _ _ _ . . . . . _ _ . . _ _ _ _ _ . . _ _ 25 If.a.re-drilt, !:Ias.a to-403fQr .<ibandonment be.en apprQved _ . _ _ . . . _ _ _Yes _ .12/23/2004. . _ _ _ _ . . . _ _ _ _ _ . . _ _ _ _ . . _ _ _ _ . . _ 26 Adequ.ate.wellbore sep<lratio_n.pro-posed. . _ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _Y_es _ _ _ _ _ _ . _ _ _ _ . . . _ _ _ _ . _ _ _ _ _ . _ _ . . . _ _ _ _ _ _ _ . . . _ _ . . . _ _ _ _ _ _ . _ _ . . _ _ _ . . _ _ _ _ _ _ _ . 27 Jf.djverter Jeq.uiJed, dQes Jlmeet reguJations_ _ _ . . _ _ . . . _ _ _ _ . . _ _ .NA . _ Sidetrack. . _ _ _ . . _ 28D.riUillg fJuJdprogram $chematic.& eq.uipJistadequate _ . . . . . _ _ _ _ _ . . _ _ _ _ . Yes _ Max MW8.5 PP9. _ . _ _ . _ . _ 29 _B.oPEs,_ do .they meet reguJatioll _ . . _ . . . . _ _ _ . . . . . . _ _ . . . . _ _ _ _ . . . . _ Yes _ _ _ . _ _ _ . . _ _ . . _ _ _ 30 _B_OP.E.press ratillg ap-propriate;test to (put psig in_comments). _ _ _ _ _ . . _ _ yes _ _ _ . . . _ Test to 350Q psi. .MS~ 22.50 psi.. . . 31Choke.manjfold cQmplies w/APt ß~-53(May S4L _ _ _ _ . . _ _ Yes _ _ . . _ . _ _ . . . . . 32 WQrk wiJI occ.ur withou!.operatjon .shutdQw.n . _ . _ _ _ . . . . Yes _ . . . _ _ _ . . _ _ _ _ . . . . _ _ _ . . . _ _ _ _ . . _ _ 33 Js presence Qf H2S gas probable. . _ _ _ _ _ _ . . .No _ _ Nolan H2S pad. _ _ . . _ _ . _ . . _ _ _ . . . . . _ _ . . . . . 34 Mecha.nlcal.cOllditlon .of wells within AOB yerified (For. servjC!~ welJ ol1ly). . . _ . _ _ _ _ .NA _ _ . . . . _ . . . . . _ _ _ _ . . . . _ _ . _ _ . _ Program DEV On/Off Shore On - - - - - - - - - - - - - - - - - - ~ - . - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 35 Permit œn be issued w/Q hydrogen sulfide me¡¡S_Ures _ _ 36 Data. PJesellted on potential oveJpress\,JrezOl1es. 37 .S_elsmicanalys.is Qf sballow g¡¡szolles. . . _ 38 .S.eabedcondjtioll survey (if off-shore) _ _ _ . . . . . 139 _ CQnta.ct namelphOl1e.fQrweekly progress reports [exploratotY.onIYl . . _ _ _ _ _No.. _ _ _... .NA .NA .NA . _ _ _. .NA _... __ - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - ~ - - - - - - - - - - - - - - - ~ - - - - - - - - - -- - - ~ - - - - ~ - - - - Date: Engineering Commissioner: c:ft""' Date Y0~ Date I / <f../Ú