Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout205-003By Anne Prysunka at 11:48 am, Aug 04, 2022
• STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMM, )N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0
Suspend 0 Perforate ® Other Stimulate 0 Alter Casing El Change Approved Program 0 ,
Plug for Redrill 0 Perforate New Pool 0 Repair Well El Re-enter Susp Well 0 Other: ft-1-C/fiP V7
2 Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number:l 205-003
3. Address: P.O.Box 196612 Anchorage, Development Exploratory 0
AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: $4 50-029-22383-01-00
7. Property Designation(Lease Number): • ADL 0028305 8. Well Name and Number: ' PBU C-39A
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL RECEIVED.
11.Present Well Condition Summary:
Total Depth: measured 12102 feet Plugs measured 10515,10989 feet AUG 2 5 2015
true vertical 9040 feet Junkmeasured 12069 feet
Effective Depth' measured 10515 feet Packer measured 8867,9924 66 feet OG CC
true vertical 9036 feet Packer true vertical 8337 71.8903 42 feet
Casing: Length: Size: MD: TVD Burst: Collapse.
Conductor 80 20"91.5#H-40 35-115 35-115 1490 470
Surface 31997 13-3/8"68#L-80 35-32032 35-9332 5020 2260
Production 9030 9-5/8"47#NT-80 34-9064 34-8463 6870 4760
Liner 1227 7"29#NT-80 8868-10095 8339-8951 8160 7020
Liner 70 3-1/2"8.81#L-80 9945-10014 8909-8929
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: 10420-10450 feet 10620-10680 feet 10740-10770 feet 10770-10800 feet 11040-11340 feet
11500-12050
True vertical depth: 9026-9030 feet 9034-9033 feet 9033-9033 feet 9033-9034 feet 9035-9035 feet
9034-9039
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 32-9964 32-8915
Packers and SSSV(type,measured and 4-1/2"TIW Packer 8867 8337 71
true vertical depth)
4-1/2"Baker SABL-3 Packer 9924 66 8903.42
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure
SCIkNtiE
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 404 38638 57 0 1522
Subsequent to operation: 715 25609 98 0 791
14.Attachments:(required per 20 AAC 25 070 25 071,&25 283) 15.Well Class after work:
Daily Report of Well Operations ® Exploratory ❑ • Development m Service 0 Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work: . Oil RI Gas 0 WDSPL 0
Printed and Electronic Fracture Stimulation Data El GSTOR 0 WINJ 0 WAG 0 GINJ ❑ SUSP 0 SPLUG 0
17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt
N/A
Contact Summerhays,Nita M(,IPRO Technologies) Email Nita.Summerhays@bp.com
Printed Name Summerhay ita , (WIPRO Technologies) Title Petrotechnical Data Manager
Signatu ff,,,�, �� . 15,11''A-09%/I•.4_1( Phone +1 907 564-4035 Date 08/25/2015
_- - . UG 2 6 101
Form 10-404 Revised 5/2015 %. �
Va 9/3///y//5- L !!/��lj//� / Submit Original Only
Daily Report of Well Operations
PBU C-39A
ACTIVITYDATE SUMMARY
CTU#8 w/ 1.5"Coil (CV=24.8)
Scope: Set CIBP&Adperfs 30'
MIRU CTU#8- SSV NFT failed-Grease Crew Service-BOP Test. Safety Time out with night and
day crews. Review Alaska Region Safety Time out for August. M/U Lube, M/U CTC. Pull test,
10K, M/U MHA, Press test 3650 psi. M/U PDS memory logging tools and 2.25"JSN as a drift. PT
lube. RIH with PDS logging tools. Tag CIBP at 10990'. Log up to 10450'. Flag coil. Log up to
9800'. POH. NFT swab and SSV. Lay out PDS. Good data. Repair short in mast weight cell.
MU wfd 2-7/8"CIBP-RIH to flag and corr depth -Set CIBP @ 10,515'- POOH
8/10/2015 ***Continue on WSR 8-11-15***
CTU#8 w/ 1.5"Coil (CV=24.8) Scope: Set CIBP&Adperfs 30'
***Continued from WSR of 08/10/15***
SBD Wfd BHA 7/16" ball recovered- PT wfd MHA- MU 30'of 2" Perf Guns- RIH tag CIBP 10,515'-
corr depth-Perforate 10,420- 10,450'- POOH-BD Spent Perf Guns(ASF& 1/2" ball recovered)-
RDMO CTU#8. Tubing freeze protected with 50/50 meth. Well left shut in. Pad operator to POP
well.
8/11/2015 ***Job Complete***
T/I/O= 800/1180/0 Removed existing 2" FMC 120 IA valve- Installed new 2 1/16"CIW HWO IA
8/14/2015 valve tag#05 FWP= 800/1180/0 See log for details.
T/I/O = 810/1080/160. Temp=96*. IA FL(Eval TxIA comm). No GLT. DPBGL used Aug 12& 13
to stack well out for POP. IA FL @ 6975' (sta#1, SO).
8/16/2015 SV=Closed. WV,SSV,MV=Open. IA,OA=OTG. (0230 hrs)
Fluids Summary
BBLS Type
102 SLICK 1% KCL
103 50/50 METH
205 Total
•
• N 'Cr
141
V
0 0 0 0 O
m r- CO O CO CO
MMQDO COO N M
CO
O) O) O O O)
O) CO CO CO O) O) CO
CO O) CO M
O M O N M N
M M M M O) O) O M
CO CO CO O)
co M
O O 0 0 c 0
N O O O N
M
V
03
I I
Q
< co co 'cr
M 00 � CD N
cococoCO O) O O M
'1 CO O)
S
CCI
I— a O O O O O O
o CO CO CD CO CO O CO
i J H CO J z 11. J
N• CO ca
O N Z O
03 Ci) co CO _ O
U - MCCDNCV - � CV
NM LC) I� (-se-5
O M M N 4
O N N CO N
r+
coco
• CO M coOo O)
J
Z
• OC F- O
' O O
U au_ OCLCLCLCLZ
Z c O W W W W
O D W Z Z Z Z j
UcndJJJJI—
TREE" 4-1/2"-5M CNV C-39A
WELLHEAD= 13-5/8" 5MFMCSA. . NOTE W ELL ANGLE>70°@ 9850'
ACTUATOR
I
OKB.ELEV= 77
BF H..EV= 34'
KOP 6077' Q - - 2178' H4-1/2'SSSV,OTIS LANDING NP,ID=3.813"
Max Angle= 94'@ 10618'
Datum P4)= 9828'
Datum TVD= 8800'SS
GAS LFT MANDRELS
13-3/8"CSG,68#,L-80 BTC,D=12.415' H 3202' ST MD TVD DEV TY FE VLV LATCH PORT DATE
} 2 3981 3980 1 0715 DOME RM 16 08/27/14
Minimum ID = 2.37" @ 10476' I- I 1 6975 6917 26 OTLS SO Rpt 20 08/27/14
TOP OF 2-7/8" LINER
a"------1 7578'-7615' H4-1/2"BKR PATCH,D=2.45(08/16/14)
TOP OF 7"LNR H 8867'
9873' —14-1/7 SWS X NP,D=3.813'
9-5/8"CSG,47#,NT-80,I)=8.681" --1 9063'
ita 9873' 4-1/2"X 2-7/T X FROFLE NP REDUCER,
D=2.313'(8!6/14)
2 1i 9924' 4-1/713=
TOP OF 3-1/7 X 33/6"X 2-718"LNR/CMT) — 9946' 9945' —13.70"BKR DEPLOY SLV,(:)=3.00"
995T 1
I-14-1/2"SWD S X NP, =3.813"
BEHIND
4-1/2"TBG, 12.6#,L-80 NSCT, H 9963 9963' —14-1/2"WLEG,D=3.958' CT INR
.0152 bpf,ID=3.958"
9973' HELM°TT LOGGEi)01/26/96
i1/4. Pog
,3 9983' —1 3-1/2"HES x NP,D=2.813"
3-1/2"LNR,8.81#,L-80 STL,.0087 bpf,D=2.997H 10013' ,▪: 10013' H3-1/2"X 3-3/16'XO,D=2.377"
v
3rd BKR WHPSTO FC(01/27/05) --1. 10090' • 4. MILLOUT WINDOW(C-39A)10095'-10102'
Nbit
w/3 RA TAGS ia10102'
_
2nd WN-'STOCK(PUSHED TO BTM 01/26/05) — 10146' ,*+ 7 1 10476' H3-3/16"X 2-7/8"X0,D=2.37"
1st WHIPSTOCK(DAMAGED)(01/23/05) —j 10158' ,'. kilt:.4 N. 10515' —2-7/8'WFD CBP
RA TAG @ 10167'(01/24/05) Il '+' (08/10/15)
DR BLANKING PLUG(01/19/05) 10360' ,� .W 10989' 2-7/8'WED GBP
mal (09/07/14)
7"X 3-1!2"BKR MODE D FICR D=3.25' --� 10360' M��� `+� ��
f
-' TD 11085' •'�q
7'LNR,29#,L-80 NSCC,.0371 bpf,D=6.184' -{ 10505' ,,.....4
21
le •
PERFORATION SUMMARY I ` 3-3/16'LNR,6.2#,L-80 TCI, 10476' '11t14.
RE LOG: SWS MC'L/GR ON 02/02/05 0076 bpf,D=2.800'
ANGLE AT TOP F .82'010420' 4Nie-`i•
RSH:2-7/8"WVFD CEP MRLHD/PUSI-033 DH(9/6/14) —1 ? -+A
Note:Refer to PI-oduction DB for historical perf data 12069'
SIZE SFE INTERVAL Opn/Sqz SHOT S07 —1
2" 6 10420-10450 0 08/11/15
2" 6 10620-10680 C 09/08/14 2-7/8'LMR,6.4#,L-80 STL,.0058 bpf,D=2.441" --{ 12102'
2' 6 10740-10800 C 09/08/14
2" 6 11040-11340 C 02/02/05
2" 6 11500-12050 C 02,02/05
DATE REV BY CONI E34TS DATE REV BY COMMENTS PRAFOE BAY UNIT
08/08/93 DOYON9 ORIGINAL COMPLETION 09/11/14 JMD SQ' V 1IC CLEAN(PPER TALLES WELL C-39A
02/05/05 NOROIC1 CTD SIDETRACK 08/24/15 BLS/A4)SET WED&ADFERFS PERMT No:"2050030
08/06/14 CN/PJC SET NP RED&XX PLUG API No: 50-029-22383-01
08/16/14 GW/PJC SET BKR PATCH SEC 19,T11 N,R14E, 1835'FAL&1222'FEL
08/27/14 RCT/PJC RILL PLUG/GLV C/O
09/09/14 ALMJMD CBR'FISFYADPERFS(09/07-08/14) BP Exploration(Alaska)
.
.
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~ oS - [) 03 Well History File Identifier
Organizing (done)
o Two-sided ""1111111" "'11I
o Rescan Needed III" 111111" 1111/1
R,CAN
vz1' Color Items:
o Greyscale Items:
DIGITAL DATA
~kettes, No. :3
o Other, No/Type:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
o Other::
BY:
~
...
Date: Lt
13
o
151
yY\-P
1111111111111' "III
Project Proofing
BY:
~
6... Mana~
Date: 4- / 3
D7
+ ::l{b = TOTAL PAGES S(P
(Count does not include cover sheet) '1 All P
151 V r t
151
mfJ
Scanning Preparation
BY: ~
/
x 30 = r~ D
Date: if I L~ / D 7
1111111111111111111
Production Scanning
Stage 1 Page Count from Scanned File: ~ 1) 7 (Count does indude 7' sheet)
Page Count Matches Number in Scanning Preparation: V YES
~ Date:~/'3/07
151
NO
MP
BY:
Stage 1
If NO in stage 1, page(s) discrepancies were found:
YES
NO
BY:
Maria
Date:
151
III 11111111I11 " 1/1
Scanning is complete at this point unless rescanning is required.
ReScanned
11111111111111 "III
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
III "1/1111I111111I
1 0/6/2005 Well History File Cover Page. doc
STATE OF ALASKA
n_.SKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS JA\1 1 `' `o"r
1.Operations Abandon ❑ Repair Well❑ Plug Perforations Li Perforate Li Other Nfi(
c/Bp
I Performed: Alter Casing IS Pull Tubing Stimulate-Frac ❑ Waiver ❑ Time Extension 1/1-F 4/2z-/i9
Change Approved Program ❑ Operat.Shutdowns Stimulate-Other ❑ Re-enter Suspended Well❑
2.Operator 4.Well Class Before Work: 5.Permit to Drill Number:
Name: BP Exploration(Alaska),Inc
Development0 Exploratory E t 205-003-0
3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number:
Anchorage,AK 99519-6612 50-029-22383-01-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL0028305 . • PBU C-39A
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
I ' PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary:
Total Depth measured , 12102 feet Plugs measured 10420 feet
true vertical 9039.88 feet Junk measured None feet
Effective Depth measured ' 10420 feet Packer measured See Attachment feet
true vertical 9025.94 feet true vertical See Attachment feet
Casing Length Size MD ND Burst Collapse
Structural None None None None None None
Conductor 80 20"91.5#H-40 35-115 35-115 1490 470
Surface 3168 13-3/8"68#L-80 34-3202 34-3201.21 5020 2260
Intermediate None None None None None None
Production 9030 9-5/8"47#NT-80 33-9063 33-8462.57 6870 4760
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation depth Measured depth 11040-11340 feet 11500-12050 feet
4
True Vertical depth 9035.19-9034.59 feet 9034.34-9039.22 feet SCANNE® tU Z01
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 31-9963 31-8914.88
Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer
None None None SSSV
12.Stimulation or cement squeeze summary:
Intervals treated(measured): RBDM MAY 1 6 2014
4
1 Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 516 37721 54 0 1637
Subsequent to operation: 443 36354 48 0 1605
14.Attachments: 15.Well Class after work:
Copies of Logs and Surveys Run Exploratory❑ Development Q . Service❑ Stratigraphic ❑
Daily Report of Well Operations X 16.Well Status after work: Oil, Q Gas U WDSPL❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Contact Nita Summerhays Email Nita.Summerhays(d�bp.Com
Printed Name Nita Summe s Title Data Coordinator
Signat /. /f/_IA_, ` 1.24 -1!"—IgerPhone 564-4035 Date 1/15/2014
VL- 5—/ '
,, /102-//7
Form 10-404 Revised 10/2012 Submit Original Only
Daily Report of Well Operations
ADL0028305
CTU#9 w/ 1.75 ACTive GT
Job Scope: Drift/tag PB,
PPROF(GR/CCL/SPINNER/TEMP/PRESS/XY Caliper), & Borax
Log MCNL
Contingent CIBP
10/9/2013 <<<Job in Progress>>>
«<Continued from 10/9/2013>>>
CTU#9 w/ 1.75 ACTive CT
Job Scope: Drift/tag PB,
PPROF(GR/CCL/SPINNER/TEMP/PRESS/XY Caliper), & Borax
Log MCNL
Drifted to TD @ 11990'ctm, rehead active coil and MU PL tools
currently running in hole for PPROF.
10/10/2013 «<Job in Progress>>>
«<Continued from 10/10/2013>>>
CTU#9 w/ 1.75 ACTive CT
Job Scope: Drift/tag PB,
PPROF(GR/CCL/SPINNER/TEMP/PRESS/XY Caliper), & IPROF,
Borax Log MCNL
Drifted to TD @ 11990'ctm (12048.5 corrected), Ran PPROF
majority of gas entry is @ 11850'md (middle of lower perfs) made
passes @ 80/100/60 fpm due to 1.75" coil in 2 7/8" liner,
performed DTS flowing and shut in survey, POOH
10/11/2013 «<Job in Progress>>>
«<Continued from 10/11/2013>>>
CTU#9 w/ 1.75 ACTive CT
Job Scope: Drift/tag PB,
PPROF(GR/CCL/SPINNER/TEMP/PRESS/XY Caliper), & IPROF,
Borax Log MCNL
Complete IPROF and MCNL Borax log, , pooh recovered good
data, No obvious signs of channeling, pad Engineer ok with setting
CIBP allgplErid, make up 2 7/8" CIBP. set 2 7/8" CIBP @
11420'md, RDMO
10/12/2013 «<Job complete>>>
FLUIDS PUMPED
BBLS
76 60/40 METH
650 KCL
120 BORAX
846 TOTAL
C)
N O O O O O
co N N � M Cfl
Of- No
CO
0
y 0 0 0 O O O
O O N N CO
CO O
CO r 00 CO LU CO
CO LO N CO • CO
N O I� CO O) LC) N CO
- 0 0) N 0) O C
- CO N CO CO N O O
O O O O 0) 't N O
00 CO O) 07 CO CO CO CO
H
• rt L0 N CO
I� O O co
O) N O M
co M r N co N co M M
co O) 0) O 0)
00 CO CO 0) CO
GD N CO CO N d M N M
O O O CO O O
- 0 0 = O) O N O)
N- O O O N 0) 0) M
C.)
LO
M co co M
a) N ccocoorn � o � ccococco NI- o
C 0
O
~_ O
C) 0
`t Oo °J° co Qao Op ado
C J J Q J
NZCO 00 0
U00
O N N 0\O N M CY) N
N M , (..1 CO
LO
rr CO 0 CO N
0)O N Cr) co N CO (0 CO
C 00 N CO vi.O CO O N-
O)
O) M O
-J
Z
O
Li]
D LU C.)
CUOCCQ' CCIYJ0UiZ
U Z W W W W w O m
O Z_ Z Z_ Z_ d cj 0
O J J J J Z O U) F-
Packers and SSV's Attachment
ADL0028305
SW Name Type MD TVD Depscription
C-39A PACKER 8867 8265.71 4-1/2" TIW Packer
C-39A PACKER 9924 8831.22 4-1/2" Baker SABL-3 Packer
TREE= 4-112"-5M CIW
•WELLHEAD= 13-5W_5M FMC SAFETY NOTE WELL ANGLE>700 @ 9850'
39A
ACTUATOR _?
OKB.ELEV= 72'
KOP= 6077'
Max Angle= 94"@ 10618'
2179' H4-1/2"SSSV,OTIS LANDING NP,D=3.813"
Datum KID= 9828' 0
Datum TVD= 8800'SS
13-3/8'CSG,68#,L-80,0=12.415' —{ 3207 '
GAS LFT MANDRELS
ST MD TVD DB/ TYPE VLV LATCH PORT DATE
2 3981 3980 1 OTIS DOME RM 16 02/10/05
Minimum ID =2.37" @ 10476' 1 6975 6917 26 OTIS SO RM 20 02/10/05
TOP OF 2-7/8" LINER
TOP OF 7"LNR J-- 8867' .
9-5/8"CSG,47#,NT-80,D=8.681' —i 9063' J---
9873' H4-1/2"NP,SWS,D=3.813"
9924' --17"X 4-1/2"PKR,BAKER SABL-3,D=3.87"
0el 9945' --13.70'BKR DEPLOY SLV,D=3.00"
A f(' 9945' H TOP OF CBMENT(Al-I tit CLEANOUT)
4-1/2"TBG,12.6#,L-80 NSCT,.0152 bpf,D=3.958" }--1---9962' 114 ��I 9957' —,4 1/2"NP,SWS,D=3.813"(BE3M1�PIPE) i
44 11 9962' 4-1/2"TUBING TAL,WLEG(BENND PIPE) i
4
444 •/444
'111) ,.11 9973' H am()TT LOGGED 01/26/96(BEHIND PIPE)
111, +, 9983' 3-1/2"HES X NP,D=2.813"
1111 O14/ •
3-1/2"LNIZ 8.81#,L-80 STL,.0087 bpf,D=2.99' 10013' 4.4' i'#, 10013' H3-1/2"X 3-3/16"XO,D=2.377"
3rd BKR WHIPSTOCK(01/27/05),w/3 RA TAGS H 1 4444 14�,
RA TAG(02101/05) 10102' , 11.11! I anu-Lan,' ::aa."-e""1%,-"0'+'
2nd WHIPSTOCK(PUSHED TO BTM 01/26105) 10146' •
�7��4�4�4�47?�� +nnae• +n+nom•
1'•4'4.4.4•#'4,
1st WHPSTOCK(DAMAGED)(01/23/05) H 10158' !�1......1.4.4.441A4♦
p•is Y'1'1'4'141414141l/,.
RA TAG(01/24/05) -{ 10167' ,4A4A1v1�tv�4�,11111 ,.
DR BLANKING PLUG(01/19/05) -{ 10360' ..A•.&1�411uu1���414141414141411111�i 10476' 13-3/16".X 2-7/8"
�' rl 14111111111144141141 x0,ID=2.37"
E.
7"X 3-1/2'BKR MODD PKR,D=3.25" —i 10360' 4.4141414141��* 11420' —2-7/8'VVFD
TOP OF 4-1/2"LNR H 10391' 0 1D 11085' CBP
7"INR,29#,NT-80,.0371 bpf,D=6.184" H___:_1051... ..,.....4 (10/12/13)
I
4-1/2'SLTD✓SOLD LW,12.6#,L-80,D=3.953" 11632'
3-3/16"LIR,6.2#,L-80 TCI, —L 10476'
PERFORATION SUMMARY I I .0076 bpf,D=2.800'
REF LOG: SWS MCNL/GR ON 02/02/05 PBTD —{ 12069'
ANGLE AT TOP PE32F:91'(11040'
Nbte:Refer to Production DB for historical pert data 2-7/8'LIR,6.4#,L-80 STL,.0058 bpf,D=2.441" — 12102'
SIZE SPF INTERVAL Opn/Sqi St-DT SQZ
2" 6 11040-11340 0 02/02/05
2" 6 11500-12050 C 02/02/05
DATE REV BY COMMENTS DATE REV BY , COIMENTS PRIAHOE BAY UNIT
08/08/93 ORIGINAL COMPLETION WELL: C-39A
02/05105 NOJUC1 CTD SIDETRACK PERMIT No:' 050030
02/10/05 RMIATLH GLV GO AR No: 50-029-22383-01
01/29/06 JAF/TLH DREG DRAFT CORRECTIONS SEC 19,T11N,R14E,1835'FAL&1777 FEL
10/29/13 JDMJM) SET 2-7/8"WFD C IBP(10/12/13)
BP Exploration(Alaska)
• •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
0
Anchorage, Alaska 99519 -6612
August 22, 2011 RE CEIVED
AUG31 201
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission AEI *a O & Goa Coos. Commission
333 West 7 Avenue AncE+3rfo n
Anchorage, Alaska 99501
a05--00 3
Subject: Corrosion Inhibitor Treatments of GPB C -Pad � 3/ f\
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB C-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
II
• •
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
C -Pad
7/19/11
Corrosion
Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft na gal
C - 01A 2030100 500292012101 0.3 NA 0.3 NA 3.40 11/16/2010
C -02 1730040 500292012300 0.3 NA 0.3 NA 3.40 11/16/2010
C -03B 2051580 500292012402 0.3 NA 0.3 NA 3.40 11/16/2010
C -04B 2060570 500292012502 1.25 NA 1.25 NA 23.80 10/26/2010
C -05A 2010020 500292012601 0.8 NA 0.8 NA 3.40 11/23/2010
C -06B 2061040 500292012702 1 NA 1 NA 5.10 11/22/2010
C -07A 2000520 500292012801 0.3 NA 0.3 NA 1.70 11/22/2010
C -08B 2050110 500292012902 1 NA 1 NA 5.10 11/20/2010
C -09A 2020940 500292036601 0.1 NA 0.1 NA 0.85 11/23/2010
C -10A 2051370 500292037101 0.1 NA 0.1 NA 3.40 11/12/2010
C -11A 2030480 500292038201 0.1 NA 0.1 NA 1.70 11/13/2010
C -12B 2090850 500292038702 2 NA 2 NA 10.20 11/11/2010
C -13A 1971430 500292040401 10.7 NA 10.7 NA 74.80 11/25/2010
C -15A 2090520 500292042701 10.5 NA 10.5 NA 64.60 11/25/2010
C -168 2060510 500292043802 45 10.0 0.6 7/19/2011 3.40 7/19/2011
C -17B 2040940 500292043902 1 NA 1 NA 6.80 11/13/2010
C -18B 2090710 500292078502 9.6 NA 9.6 NA 69.70 11/23/2010
C -19B 2000050 500292073502 11 NA 11 NA 76.50 10/27/2010
C -20C 2091300 500292074503 1.9 NA 1.9 NA 10.20 11/11/2010
C -21 1820810 500292074503 1.7 NA 1.7 NA 8.50 11/11/2010
C -22A 2060390 500292075801 0.7 NA 0.7 NA 5.10 11/11/2010
C -23C 2081700 500292077503 25 4.0 0.08 7/15/2011 0.85 7/19/2011
C -24A 2040580 500292081601 Sealed NA NA NA NA NA
C -25B 2041090 500292081902 0.7 NA 0.7 NA 3.40 11/22/2010
C -26A 1981450 500292083401 0.8 NA 0.8 NA 3.40 11/22/2010
C -27B 2031860 500292084302 7.5 NA 7.5 NA 39.10 11/21/2010
C -28B 2100630 500292086702 1 NA 1 NA 5.10 11/21/2010
C -29A 1961700 500292147201 23 10.0 0.9 7/15/2011 6.80 7/19/2011
C -30A 2081690 500292177701 0.2 NA 0.2 NA 1.70 11/20/2010
C -31B 2030080 500292177502 0.8 NA 0.8 NA 5.10 11/22/2010
C -32C 2061390 500292155903 0 NA 0 NA 0.00 11/13/2010
C -33A 2002020 500292237301 1 NA 1 NA 6.80 11/11/2010
C -34A 2060370 500292178501 2.2 NA 2.2 NA 10.20 11/20/2010
C -35B 2061290 500292155302 1.5 NA 1.5 NA 10.20 11/15/2010
C -36A 2000020 500292179001 2 NA 2 NA 10.20 11/13/2010
C -37B 2101000 500292236002 4.7 NA 4.7 NA 30.60 10/28/2010
C -38 1860660 500292157100 0.1 NA 0.1 NA 0.85 11/15/2010
C -39A 2050030 500292238301 1 NA 1 NA 0.85 11/23/2010
C -41A 2041880 500292238501 Sealed NA NA NA NA NA
C -42 1930500 500292235700 2.6 NA 2.6 NA 13.60 11/13/2010
"4
.MICROFILMED
03/01 /2008
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFicl~\CvrPgs_InsertslMicrofilm Marker.doc
.-
~ __
• •
WELL LOG TRANSMITTAL
To: State of Alaska September 7, 2007
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs : C-39A+PBl AK-MW-3505869
C-39A+PB1:
Digital Log Images: 1 CD Rom
so-o29-22383-01,71 ~ ~ ~fl~7
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING_?jN.D.R~T~JR~ING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENfiION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
---
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, MB33
900 E. Benson Blvd.
Anchorage, Alaska 99508
Signed:
~ (5~ ~S
~b5 -00~
~` ~ S~a`~
;{M~
DATA SUBMITTAL COMPLIANCE REPORT
3/12/2007
Permit to Drill 2050030
Well Name/No. PRUDHOE BAY UNIT C-39A
Operator BP EXPLORATION (ALASKA) INC
>p",d
API No. 50-029-22383-01-00
MD 1210~
TVD 9040/
Completion Date 2/212005
Completion Status 1-01L
Current Status 1-01L
UIC N
" -----------
~.~.._._-~--
------,----.
---.-.----.-..-.-.-.---...,,------
REQUIRED INFORMATION
Mud log No
Samples No
Directional surve~
~~ --- ---..---------
~--,_._~---
DATA INFORMATION
Types Electric or Other Logs Run: MWD GR I EWR, MGR I CCl I CNl
Well Log Information:
(data taken from logs Portion of Master Well Data Maint
Logl Electr
Data Digital Dataset Log Log Run Interval OHI
Type MedlFrmt Number Name Scale Media No Start Stop CH Received Comments
-- . ~-_.__._-_._-----~
¡YD D Asc Directional Survey 10092 12072 3/11/2005
Zø5 D Asc Directional Survey 10157 11 060 3/11/2005 PB 1
:5Pt Directional Survey 10092 12072 3/11/2005
~ Directional Survey 10157 11060 3/1112005 PB 1
~ 14298 Gamma Ray 2 Blu 8814 11988 Open 12/21/2006 MCNl 2-Feb-2006
C Lis 14298 I nd uction/Resistivity 8820 11995 Open 12/2112006 LIS VERI, GRCH, NCNT,
~ eel
14363 LIS Verification 9980 12074 Open 1/2912007 LIS Veri, GR, ROP, FET
¿;LC Las 14363 I nd u ctionlResistivity 9980 12074 Open 1/2912007 LIS Veri, GR, ROP, FET
143b~~..rr6tion ~ ~~1~ ~~
.PH1 LlC fHI. GR, ROP,
~~C FET
Las 14363 I nd u ctionlResistivity 9980 12074 Open 1/2912007 PB1 LIS Veri, GR, ROP,
FET
.--.--....-----..---
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
e
-
ADDITIONAL INFORMATION
Well Cored? Y IV
Daily History Received?
()N
é))N
Chips Received? <: Y I N
Formation Tops
Analysis Y / N
Received?
---.----..--------
-- ---_..__..~.~._---
Permit to Drill 2050030
MD 12102
Comments:
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
3/12/2007
Well Name/No. PRUDHOE BAY UNIT C-39A
Operator BP EXPLORATION (ALASKA) INC
TVD 9040
Completion Date 2/2/2005
Completion Status 1-01 L
Current Status 1-01L
UIC N
( -----~
--~
Date:
API No. 50-029-22383-01-00
~_._--
q~~-7
e
e
.
.
\VELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
January 16,2007
RE: MWD Formation Evaluation Logs: C-39A+PBl,
AK-MW-3505869
1 LDWG formatted CD rom with verification listing.
API#: 50-029-22383-01, 7(
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURl\¡ING A COPY OF THE TRA1~S.MITTAL
LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petrotechnical Data Center MB33
900 E. Benson Blvd.
Anchorage, Alaska 99508
DateA ;',;,~) L,
;:'",~J \',& -~ i:;¢ ,,,'
Signed ê..1t----
..- "J03"
,~, ,"" _.7 '. ;
~....'-'"
.1" . '/'3" ¡?
#JII:. /"""1 ( . "'0",,)
.
.
Schlumb8Pgep
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
C-39A
Job#
10715453 CH EDIT MCNL
;!. 1 2006
,'\_~n¡1
comm\$sion
Log Description
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
~- . -:-7
-905 -CD,')
'\,
·F ILfêA1f
! 8/8V/ tþ
Date
02/02/05
12/18/06
NO. 4085
Company: State of Alaska
Alaska Oil & Gas Cons Comm
AUn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
Color
CD
1
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
.. STATE OF ALASKA .
ALASKAlll!lJL AND GAS CONSERVATION COM, ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
RECEIVED
MAR 0 4 2005
1a. Well Status: 1m Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1835' SNL, 883' WEL, SEC. 19, T11 N, R14E, UM
Top of Productive Horizon:
1316' SNL, 1840' EWL, SEC. 20, T11N, R14E, UM
Total Depth:
280' SNL, 2575' EWL, SEC. 20, T11N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 664508 y- 5959387 Zone- ASP4
TPI: x- 667218 y- 5959966 Zone- ASP4
Total Depth: x- 667927 y- 5961018 Zone- ASP4
-------------~~---- -~~~------------ ------------------
18. Directional Survey 1m Yes 0 No
21. Logs Run:
MWD GR I EWR, MGR 1 CCL 1 CNL
22.
CASING
SIZE
20"
13-3/8"
9-518"
WT. PEA Fr.
91.5#
68#
47#
29#
9.3# /6.2# /6.16#
GRAbE
H-40
L-80
NT -80
L-80
L-80
7"
3-1/2" x 3-3116" x 2-7/8"
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE
lOP BoTTOM lOP BoTTOM SIZE
32' 110' 32' 110' 30" 280 cu ft Arcticset (Approx.)
34' 3202' 34' 3201' 16" 1883 cu ft PF 'E', 483 cu ft Class 'G'
33' 9063' 33' 8463' 12-1/4" 1112 cu ft PF 'E', 343 cu ft Class 'G'
8867' 10095' 8338' xxx' 8-1/2" 370 cu ft Class 'G'
9945' 12102' 8909' 9040' 4·1/8" x 3-314" 152 cu ft Class 'G'
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
2" Gun Diameter, 6 spf
MD TVD MD TVD
11040' - 11340' 9035' - 9035'
11500' - 12050' 9034' - 9039'
26.
Date First Production:
February 15, 2005
Date of Test Hours Tested PRODUCTION FOR
. 2/23/2005 4 TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED +
Press. 880 1,200 24-HoUR RATE
One Other
5. Date Camp., Susp., or Aband.
2/2/2005
6. Date Spudded
1/24/2005
7. Date T.D. Reached
1/30/2005
8. KB Elevation (ft):
72'
9. Plug Back Depth (MD+ TVD)
12066 + 9039
10. Total Depth (MD+TVD)
12102 + 9040
11. Depth where SSSV set
(Nipple) 2179' MD
19. Water depth, if offshore
NI A MSL
24.
SIZE
4-1/2", 12.6#, L-80
25.
DEPTH INTERVAL (MD)
2000'
Alaska Oil & Gas Cons. Commission
1b. Well Class: Ancnorage
1m Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
205-003
13. API Number
50- 029-22383-01-00
14. Well Name and Number:
C-39A
15. Field I Pool(s):
Prudhoe Bay Field I Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
ADL 028305
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
DEPTH SET (MD)
9962'
PACKER SET (MD)
9924'
AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 32 Bbls of MeOH
CONTINUED ON REVERSE SIDE
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
OIL-BBL
833
GAs-McF
2,967
GAs-McF
17,800
WATER-BBL
38
WATER-BBL
228
OIL -BBL
4,995
CHOKE SIZE I GAS-OIL RATIO
96° 3,564
OIL GRAVITY-API (CORR)
26.5
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
r;i.j:·:!·i¡:¡:~rT RBDMS 8FL MAR 0 8 2005
Nonl~4
L._~- . ~F
Form 10-407 Revised 12/2003
G
,28.
GEOLOGIC MARKER.
29.
.ORMATION TESTS
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
NAME
MD
TVD
Zone 18
10368'
9018'
None
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I ~erebY certify that the f/Oin~ is true and correct to the best of my knowledge.
Signed Terrie Hubble '1~.N'u..€. ~ I ~ Title Technical Assistant Date 03 -03· Q)
C-39A ~;.~ Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No.1 Approval No. Drilling Engineer: Mary Endacott, 564-4388
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/21/2005 00:00 - 02:15 2.25 MOB P PRE Rigging down, Moved camp to C-39 and associated equipment
02:15 - 02:30 0.25 MOB P PRE Held PJSM with Security, TS and rig crew on mobilise between
K-Pad and C-Pad
02:30 - 06:00 3.50 MOB P PRE Moved rig from K-Pad to C-Pad. Arrived on location at 0600
hrs. Set rig off to side for rig maintenances
06:00 - 06:45 0.75 MOB P PRE PJSM on working on SCR system
06:45 - 00:00 17.25 MOB P PRE Connected Gen 3 to rig
Work on camp electrical
Nordic electricians working on SCR System
Nordic crew working on replacing Gen 1 radiator, water pump
and rebuild MP#1
1/22/2005 00:00 - 01 :00 1.00 MOB P PRE Connected Gen 3 to rig
Work on camp electrical
Nordic electricians working on SCR System.
Nordic crew working on replacing Gen 1 radiator, water pump
and rebuild MP#1
--Dismissed electricians to get 8 hrs sleep.
01 :00 - 04:30 3.50 MOB P PRE Connected Gen 3 to rig. Nordic Crew continue working on
replacing Gen 1 radiator.
04:30 - 09:00 4.50 MOB P PRE Prep cellar for moving rig over well.
09:00 - 12:40 3.67 MOB P PRE Electrican fimished up on SCR work Re-wiring terminals
Rebuilding MP1 1200 hrs on pump parts
Switch to rig power from generator 3
Nordic electrican to certify SCR operations before using DC
power
12:40 - 13:45 1.08 MOB P PRE RD Gen 3 and move over towards C-39 and jack up rig
Prep C-39 location (blowing snow)
13:45 - 14:00 0.25 MOB P PRE Move to to C-Pad
14:00 - 14:30 0.50 MOB P PRE PJSM on moving over well. WHP = 0 psi
14:30 - 15:15 0.75 MOB P PRE Spotted rig over well, set down
15:15 - 16:30 1.25 MOB P PRE RU assocated equipment outside
Started SCR with Nordic electrican. Checked all SCR's and
assigments, checked out OK
16:30 - 19:30 3.00 MOB P PRE RIG ACCEPTED @ 16:30 hrs 1-22-2005
NU BOP's, shim rig, and RU outside equipment
19:30 - 00:00 4.50 BOPSUP P PRE Test BOPE. John Crisp waived witness.
- Fill pits with 2% KCI, 2 ppb bio for window milling.
1/23/2005 00:00 - 03:00 3.00 BOPSUF P PRE Continue to Pressure test BOPE.
- Swab valve leaking, call out grease crew at 00:15 hrs.
Continue with test as able. Grease crew arrived on location
00:45. Grease swab.
Open well. Dead.
- 23.5 turns on Master. 23.5 turns on Swab.
03:00 - 04:00 1.00 WHIP P WEXIT PU injector. Rehead coil.
04:00 - 05:00 1.00 WHIP P WEXIT Fill coil with 2% KCI, double slick. Pump dart at 57.3 bbls.
- Manifold frozen.
05:00 - 06:00 1.00 WHIP P WEXIT Pressure test CTC, failed. Re-head.
06:00 - 07:15 1.25 WHIP P WEXIT Crew change, PJSM on WS handling and initial RIH on new
well.
Open well, WHP = Opsi, static, RU BOT FAIV setting tool
07:15 - 09:00 1.75 WHIP P WEXIT Change CT packoffs Changed screws in CTC and pull tested
Printed: 217/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/23/2005 07:15 - 09:00 1.75 WHIP P WEXIT to 30k
09:00 - 10:00 1.00 WHIP P WEXIT Installed 3-pip tags in WS and PU WS, FAIV Tool and Sperry's
MWD tool
Confirmed external offset at 49.4 deg
10:00-11:10 1.17 WHIP P WEXIT RIH pumping at min rate
11:10 -11:30 0.33 WHIP P WEXIT Shallow hole test MWD and orienter test. Took 1.40 bpm to get
pulses. TF 160R orient 2 clicks,
11 :30 - 12:15 0.75 WHIP P WEXIT RIH to 10,020 ft for tie-in
12:15 - 13:05 0.83 WHIP P WEXIT Logging down to tie-in. (Correct = 5 ft)
13:05 - 13:10 0.08 WHIP P WEXIT RIH to WS setting depth
Wt Check at 10150 ft = 24.5k down and 37k up
RIH to 10180 ft
13:10 - 13:40 0.50 WHIP P WEXIT Orient TF around to 172 R
13:40 - 13:50 0.17 WHIP P WEXIT Inc Qp to 2.38 bpm and 3880 psi to inflate
SD and open choke CTP bleed to zero, Sheared at 3179 psi.
Checked TF orientation
Set WS at 10,158.3 ft at 166deg LOHS or 194deg ROHS
Set down 1 Ok.
13:50 - 15:30 1.67 WHIP P WEXIT POOH
15:30 - 16:00 0.50 WHIP P WEXIT LD MWD and BOT FAIV setting tool
16:00 - 16:45 0.75 STWHIP P WEXIT PU window milling BHA
16:45 - 18:23 1.63 STWHIP P WEXIT RI H to 10100 ft Wt check = 37k
RIH at 10,159.9 ft. PU
18:23 - 18:45 0.37 STWHIP P WEXIT Inc Qp to 2.5 bpm CTP = 1681 psi of bottom
Started at 10,157.3 ft painted flag. Correct to pinch point at
10,162.9 ft
18:45 - 00:00 5.25 STWHIP P WEXIT Mill window as per RP from 10,162.9' to 10,167.9' MD.
- 2.48/2.6 bpm
- 5 - 7k WOB
- 1650 - 1950 psi.
1/24/2005 00:00 - 02:30 2.50 STWHIP P WEXIT Continue milling window, exit at 10,168.2' MD.
- Outside window at 10,170.9', stalling motor.
- PU off bottom through window. RBIH.
- Drill formation to 10,174.3' MD. Pump 30 bbls 2ppb bio
sweep.
- Dress window til no motor work observed.
- Swap to new flo pro.
- Dry tag. OK.
02:30 - 04:00 1.50 STWHIP P WEXIT POOH with window milling BHA at 100 fpm, 2.6 bpm at 2570
psi.
04:00 - 05:15 1.25 STWHIP P WEXIT Lay down window milling BHA.
- Mills gauge 3.80 no-go.
- Re-head eTC. Pull test to 3500 Ibs, Pressure test to 3500
psi.
05:15 - 07:05 1.83 DRILL P PROD1 PU motor set 3 deg, Sperry s MWD and confirmed scribed.
Changed out orienter, broken spring. ( Note 2 broke springs on
K-07d and now one on C-39a)
Changed set screws on CTC and pulled test CTC to 40k.
Offset (extlint) = 65/135 deg
07:05 - 09:00 1.92 DRILL P PROD1 RIH No SHT with 3 deg motor in 4-1/2" tubing. SHT in 7" liner
below 10,000 ft.
09:00 - 09:30 0.50 DRILL P PROD1 SHT and Tie-in in 7" Liner (corrected +4 ft)
09:30 - 09:38 0.13 DRILL P PROD1 RIH TF at 166 LHS. Tagged at 10,174 ft
Printed: 217/2005 9:38: 18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/24/2005 09:38 - 09:45 0.12 DRILL P PROD1 PUH and inc Qp to 2.5 bpm and orient
09:45 - 10:10 0.42 DRILL P PROD1 Drilling at 133 L TF
Qp = 2.47/2.60 bpm; Pp = 3000/3250 psi
Vp = 325 bbl
10:10 - 10:13 0.05 DRILL P PROD1 Orient TF to 90 L
10:13 - 10:25 0.20 DRILL P PROD1 Drilling at 110 L TF
Qp = 2.52/2.72 bpm; Pp = 3000 13260 psi
Vp = 324 bbl
RA Marker at 10,168 ft
10:25 - 10:32 0.12 DRILL P PROD1 PUH to 10010 ft to tie-in to RA Marker
10:32 -11:10 0.63 DRILL P PROD1 Logging down from 10,010 ft for Geo tie-in Corrected to -2 ft to
PDC Geo log
11:10 -12:15 1.08 DRILL P PROD1 Drilling at 71 L TF
Qp = 2.66/2.97 bpm; Pp = 3000 13260 psi
Vp = 322 bbl
Adjusting TF or reactive torque
RA Marker at 10168 ft. Geo changed RA 0.5 ft
TOWS 10,157.5 ft
TOW @ 10,162.10
RA Marker @ 10,167.50 ft
BOW @ 10,167.10ft
12:15 - 12:53 0.63 DRILL P PROD1 Drilling at 60-71 L TF
Qp = 2.66/2.97 bpm; Pp = 3000 13260 psi
Vp = 322 bbl
Adjusting TF for reactive torque. 90deg
Need 28.82 BR to EOC at 88 deg and TVD = 8971.92 ft
12:53 - 13:15 0.37 DRILL P PROD1 Orient TF 2 clicks, the BR's are low. TF wants to roll L hard
13:15 - 13:50 0.58 DRILL P PROD1 Drilling at 3 L TF
Qp = 2.66/2.97 bpm; Pp = 3000 13260 psi
Vp = 310 bbl
13:50 - 14:45 0.92 DRILL P PROD1 Orient TF around to 90L Hard keeping TF
14:45 - 15:10 0.42 DRILL P PROD1 Drilling at 80-37 L TF unable to get reactive torque to 90L
Qp = 2.66/2.97 bpm; Pp = 3150 13560 psi
Vp = 329 bbl
15:10 - 15:20 0.17 DRILL P PROD1 Orient TF around to 90 L Having to pull to WS to get clicks
Pulled above window twice to get TF at 145 deg with resultant
TF 90 L
Drill 2 ft, orient 1 click, drill 2 ft, orient 1 click. to keep it from
flopping to HS and get it to 90 dgeL
15:20 - 17:30 2.17 DRILL P PROD1 Drilling at 120 L TF unable to get reactive torque to 90L
Qp = 2.53/2.65 bpm; Pp = 3150 13360 psi. ROP 40 fph with
3k WOB
Vp = 330 bbl. Drill to 10,370 ft.
17:30 - 17:36 0.10 DRILL P PROD1 Orient 1 click
17:36 - 19:00 1.40 DRILL P PROD1 Drilling at 110 to 99 L TF Adjust TF to get it at 90L
Qp = 2.53/2.65 bpm; Pp = 3150 13360 psi.
Vp = 327 bbl.
19:00 - 19:20 0.33 DRILL P PROD1 Pull up to window to orient to 40L.
19:20 - 20:30 1.17 DRILL P PROD1 Drilling at 45 L TF to 10,485' MD.
Qp = 2.53/2.65 bpm; Pp = 3150 13360 psi.
Vp = 323 bbl.
- HOT at 8971' TVD.
- Landed well at 8976' TVD.
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/24/2005 19:20 - 20:30 1.17 DRILL P PROD1 - Targeting 8967' TVD with lateral BHA.
20:30·22:15 1.75 DRILL P PROD1 POOH with build BHA.
22:15·00:00 1.75 DRILL P PROD1 PJSM. LD build BHA #3. MU BHA #4, 1.37 deg motor and
4.125" Be.
- Upload and MU resistivity.
- Re run Be - 1-1-CT
1/25/2005 00:00 - 00:30 0.50 DRILL P PROD1 Continue to MU BHA #4, 1.37 deg motor and 4.125" Be.
00:30 - 03:00 2.50 DRILL P PROD1 RIH with lateral BHA #4.
- 100 fpm
- Circulate at minimum rate.
- Pulse test at 1000 feet.
- Orienter test at 6000 feet.
- Orient through window.
- Tag TD at 10,485.1' MD.
03:00 - 04:15 1.25 DRILL P PROD1 MAD pass to 10,180' MD.
- 20k SO; 37k PU.
- Significant motor work at 10,445',10,438' MD during MAD
pass. TF 180 deg out of phase
04:15 - 05:00 0.75 DRILL P PROD1 Tie in to RA marker. Correct +2.5 feet. RBIH.
05:00 - 05:15 0.25 DRILL P PROD1 Orient TF to 90L.
05: 15 - 07:00 1.75 DRILL P PROD1 Drill ahead in lateral section. TF @ 76L
Qp = 2.64/2.81 bpm Pp = 3000 13300 psi
Having trouble sliding, back reamed BHA at correct TF 30L.
Res tool in shale from 10,400 ft 10,460 ft
07:00 - 07:25 0.42 DRILL P PROD1 Orient TF
07:25 - 08:21 0.93 DRILL P PROD1 Drill ahead in lateral section. TF @ 82R
Qp = 2.64/2.81 bpm Pp = 3000/3300 psi
Drilling on R-Side, entered polygon angel at 94 deg
08:21 - 09: 15 0.90 DRILL P PROD1 Wiper trip to window Orient TF from 140R to 50 L TF to get
through shale I DS at 10,440 ft. No problem at 10,440 ft with
90L TF
09:15 - 09:30 0.25 DRILL P PROD1 Orient TF to R-Side
09:30 - 11 :00 1.50 DRILL P PROD1 Drill ahead in lateral section. TF @ 82-90R
Qp = 2.64/2.82 bpm Pp = 3100 13500 psi
11 :00 - 11 :02 0.03 DRILL P PROD1 Orient TF to 120 still build angle at 90R
11:02 - 12:10 1.13 DRILL P PROD1 Drill ahead in lateral section. TF @ 120-130R
Qp = 2.64/2.82 bpm Pp = 3100/3500 psi
Trying to level out in sand at 8965 ft TVD
12:10 - 12:45 0.58 DRILL P PROD1 Wiper trip to window.
- No hole problems.
12:45 - 12:50 0.08 DRILL P PROD1 Orient TF to 80R.
12:50 - 14:30 1.67 DRILL P PROD1 Drill ahead in lateral section to 10,935' MD.
- 2.73/2.92 bpm
- 3200 psi free spin
- 3570 psi
14:30 - 16:00 1.50 DRILL P PROD1 Wiper trip to 9000' (50 deg hole).
- Tie in. Correct +4.5'.
- PU 34k; SO 20k.
16:00 - 17:15 1.25 DRILL P PROD1 Drill ahead in lateral section to 11,054' MD.
- 2.73/2.92 bpm
- 3200 psi free spin
- 3550 psi
17:15 - 17:30 0.25 DRILL P PROD1 Orient around to 60R.
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
PROD1 Drill ahead in lateral section to 11085.
- 2.73/2.92 bpm
- 3200 psi free spin
- 3550 psi
PROD1 Wiper to window.
PROD1 Pulled thru window in adverntly at while pumping. Stall, Unable
to get back thru window. Orient around NO GO. RIH at attempt
to bounce thru NO Go. Attempt at slow pump rate No GO.
POH.
POH.
LD BHA PU crayola mill straight motor and MWO.
RIH.
RIH
Tie - in Zero correction.
Work at top of WS 10157 with 500psi. Stalling at 10159 clean
pick ups.
Time milling at 10159.0 to 10159.8 Occasional stalls. All
pickups clean. Discuss with Baker. Decide to set a second WS.
POH
Lay down BHA. Slight wear on crayola mill 3.79" 00 going in
and 3-78" OD after pulling out of hole. No wear on nose of mill.
Wait on whipstock to arrive on location.
Prepare MWO and whipstock for RIH.
Continue to make up BHA#6, setting whipstock.
Offload flo-pro from pits.
Circulate OS KCL into coil, offloading mud from coil.
- Thawed frozen line in shute.
Pressure test coil connector.
Stab injector on to BHA.
DPRB WEXIT RIH 100 fpm, pumping at 0.25 bpm,
DFAL WEXIT Whipstock running events:
1/25/2005
17:30 - 18:10
0.67 DRILL P
18:10 -18:45
18:45 - 19:30
0.58 DRILL P
0.75 DRILL P
19:30 - 21:10 1.67 STWHIP N DPRB PROD1
21:10 - 22:30 1.33 STWHIP N DPRB PROD1
22:30 - 00:00 1.50 STWHIP N DPRB PROD1
1/26/2005 00:00 - 00:30 0.50 STWHIP N DPRB PROD1
00:30 - 01 :05 0.58 STWHIP N DPRB PROD1
01 :05 - 01 :40 0.58 STWHIP N DPRB PROD1
01 :40 - 04:00 2.33 STWHIP N DPRB PROD1
04:00 - 05:15 1.25 STWHIP N DPRB PROD1
05:15 - 06:00 0.75 STWHIP N DPRB PROD1
06:00 - 07:00 1.00 STWHIP N DPRB WEXIT
07:00 - 09:00 2.00 STWHIP N DPRB WEXIT
09:00 - 09:45 0.75 STWHIP N DPRB WEXIT
09:45 - 11 :00 1.25 STWHIP N DPRB WEXIT
11 :00 - 12:30
12:30 - 13:30
1.50 STWHIP N
1.00 STWHIP N
1. RIH to 6180' MO circulating at 0.17 bpm to shallow hole
test.
2. Brought rate up to 1.25 bpm, 2300 psi. Shut down pumps,
pressure bled to zero. Did not get a shallow hole test.
3. Discuss tool limitations with Baker. Consensus that FAIV
did not function.
4. RIH to 7100' MD, pumping at 0.10 bpm at 900 psi with
returns.
5. Bump rate back up to 0.20 bpm, saw a small weight bobble,
pressure instantly increased to 1500 psi.
6. Shut down pumps, pressure did not bleed off.
7. Stop coil.
8. Call Baker.
9. Open inner reel valve to bleed pressure.
10. Continue in hole without pumps while discussing with
Baker. Weight dragging approximately 5k Ibs.
11. While POOH, PU weight 34-37k.
12. At 7615' MD, lost 5k Ibs instantly. PUH to 7590' MD, no
drag.
13. RBIH, tag at 7630' MD with 2.0-2.5k Ibs.
14. Continue RIH to 7638' MD, weight indicator fluctuating +1-
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/26/2005 12:30 - 13:30 1.00 STWHIP N DFAL WEXIT 1 k. Looks like we are pushing the whipstock down hole. Did
not stack out.
13:30 - 15:00 1.50 STWHIP N DFAL WEXIT Decision to POOH at 100 fpm filling hole from the backside.
No visible drag.
15:00 - 16:00 1.00 STWHIP N DFAL WEXIT Lay down BHA. Whipstock left in hole.
16:00 - 17:00 1.00 STWHIP N DFAL WEXIT Wait on orders.
17:00 - 17:30 0.50 STWHIP N DFAL WEXIT MU nozzle and stinger.
17:30 - 19:00 1.50 STWHIP N DFAL WEXIT RIH tag at 7633. Set down 6K No Go. PU slight over pull 8K.
Acts like pinch point.
19:00 - 19:30 0.50 STWHIP N DFAL WEXIT Swap well to KCL and chase out of hole.
19:30 - 21 :30 2.00 STWHIP N DFAL WEXIT LD nozzel and PU fishing assy. Overshot, disconnect, jars 2
its PH-6, DBPV
21 :30 - 00:00 2.50 STWHIP N DFAL WEXIT RIH with fishing assembly. to 7550. Wt check.DN 19.6 K, UP
28.5K, tag 7632. RIH 40 fpm with 17.5K dn. Set down at
8580'. PU dragging 1-2K over. Continue to RIH. Set down in
both x nipples fell thru.Tag at 10146. Circulate 2 bpm. POH
thru tailpipe to 9830. No problem thru X nipples. Assume WS
released. RIH to 10111.
1/27/2005 00:00 - 00:20 0.33 STWHIP N DFAL WEXIT Circulate out Flo-Pro from open hole.
00:20 - 02:00 1.67 STWHIP N DFAL WEXIT POH
02:00 - 03:45 1.75 STWHIP N DFAL WEXIT Ld fishing tools. WS left on bottom as planned. MU new WS
assembly with 3 pip tags.
03:45 - 05:45 2.00 STWHIP N DPRB WEXIT RIH with WS #3. Shallow hole test 6700. 1.2 bpm @ 1050 psi.
Continue to RIH to 10055'.
05:45 - 06:15 0.50 STWHIP N DPRB WEXIT Tie· in correction +5'
06:15 - 06:50 0.58 STWHIP N DPRB WEXIT RIH to 10,112', PUH to 10,107.5 (whipstock in tension).
PU 38k; SO 25k
This places the TOWS at 10,090' MD.
Original orientation at 17 ROHS.
Click around to 39L. Confirm TF with Sperry.
Increase rate to 2.5 bpm, 4300 psi.
Shut down pumps, bleed off pressure. Tool has activated.
Pressure up to set whipstock. Set at 3100 psi.
Tool face at 22 deg LOHS.
Shut down pumps. Set 5k down on tool (20k Ibs at 10,110.3').
Pick up to shear off whipstock. Sheared off at 35k PU.
06:50 - 08:30 1.67 STWHIP N DPRB WEXIT POOH with whipstock setting tool
- Circ min rate at 1.0 bpm.
08:30 - 09:00 0.50 STWHIP N DPRB WEXIT Lay down BHA.
09:00 - 09:30 0.50 ZONISO N DFAL WEXIT PU cementing assembly.
Pressure test surface equipment to 400 psi low and 3500 psi
high.
09:30 - 11 :30 2.00 ZONISO N DPRB WEXIT RIH with cementing assembly.
- Tag pinch point at 10,101.5' MD.
- Correct -7' to 10,094.5' MD.
OFF CRITICAL PATH: Begin filling IA with diesel.
11 :30 - 12:00 0.50 ZONISO N DPRB WEXIT Continue filling IA with diesel.
12:00 - 12:45 0.75 ZONISO N DPRB WEXIT Begin injectivity test.
RATE PRESSURE IA BBLS
0.25 1600 550 2.4 (1.5 bbls to pressure up)
0.50 1750 560 4.8
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/27/2005 12:00 - 12:45 0.75 ZONISO N DPRB WEXIT 0.75 1900 570 7.6 (pressure broke over)
0.75 1570 500 10.5
1.00 1440 460 19.0
1.25 1460 430 24.0
1.50 1515 415 30.7
1.75 1540 360 35.6
2.00 1560 350 40.0
Bled off tubing, 2 bbls bleed back. IA pressure to 290 psi,
bump back up to 500 psi for cement job.
12:45 - 13:00 0.25 ZONISO N DPRB WEXIT PJSM for cement job.
13:00 - 13:30 0.50 ZONISO N DPRB WEXIT Batch up cement
13:30 - 15:00 1.50 ZONISO N DPRB WEXIT Pump cement plug.
- Pump 3 bbls fresh water at 2 bpm, 1000 psi.
- Pressure test lines to 4000 psi
- Start pumping. Zero MM at 15.8 ppg density.
- Pump 22 bbls cement.
- Pump 3 bbls water to flush lines.
- Pump 35 bbls bio water at 2.7 bpm.
- Chase with KCI.
- At 57 bbls way and 36.2 on the in MM, coordinate SI
procedure.
RATE BBLSIN WHP CIRC PRESS
0.50 36.2 1260 90
(pressure increase at 37.5 bbls, reduce rate)
0.40 37.5 1425 400
0.60 40.0 1450 600
0.75 41.5 1500 900
- Pressure increase to 1650 at 44 bbls, reduce rate to 0.6
bpm.
- IA pressure steady at 700 psi.
- WIHP steadily increasing to 2500 psi at 50 bbls (15 bbls
cement)
- PU, laying in 1:1 for the last 7 bbls of cement.
- Maintaining 2500 psi on wellhead, utilizing choke.
- Cement laid in, PUH to safety at 8000' MD.
15:00 - 15:30 0.50 ZONISO N DPRB WEXIT Wait on cement for 30 minutes with 2500 psi.
15:30 - 16:00 0.50 ZONISO N DPRB WEXIT RIH at 80 fpm, circulating 0.64 bpm, holding 500 psi WHP, to
9750' MD (anticipated TOG).
Increase rate to 2.6 bpm, holding 500 psi WHP, to 10,080' MD.
16:00 - 17:30 1.50 ZONISO N DPRB WEXIT POOH, pumping 2.6 bpm, chasing cement.
17:30 - 19:00 1.50 ZONISO N DPRB WEXIT Shut swab with 500 psi on well.
Jet stack and surface lines.
19:00 - 20:00 1.00 ZONISO N DPRB WEXIT Cut 700' coil.
20:00 - 20:30 0.50 ZONISO N DPRB WEXIT Install coil connector. Pull test 35K and PT to 3500 psi.CTC.
20:30 - 22:30 2.00 ZONISO N DPRB WEXIT Wait on cement with 500 psi trapped on well. UCA 500 psi.
22:30 - 23:15 0.75 STWHIP N DPRB WEXIT MU Milling BHA.
23:15 - 00:00 0.75 STWHIP N DPRB WEXIT RIH
1/28/2005 00:00 - 01 :00 1.00 STWHIP N DPRB WEXIT Continue to RIH for second window.Tag at 10090'
01 :00 - 08:00 7.00 STWHIP N DPRB WEXIT Milling cement 2.7/2.8 bpm @ 1825 psi. Mill 8' cement to Pinch
point identified by increase in motor work. Correct to 10094.5.
Mill window to 10,101.8' MD. Mill formation to 10,113' MD.
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1/4/2005
2/2/2005
N1
Spud Date: 7/10/1993
End:
1/28/2005 01 :00 - 08:00 7.00 STWHIP N DPRB WEXIT Dress window.
08:00 - 09:30 1.50 STWHIP N DPRB WEXIT POOH
- Saw slight overpull at nipples.
09:30 - 10:00 0.50 STWHIP N DPRB WEXIT Lay down BHA #11
- String mill: 3.80 go, 3.79 no-go
- Pilot mill: 3.77 go, 3.76 no-go. Shows good indications of
window milling.
10:00 - 11 :30 1.50 DRILL N DPRB PROD1 PU build BHA #12 with 2.83 deg MM and 4.125 bicenter.
Re-head eTC. Pull test to 35k, Pressure test to 3500 psi.
11:30-13:15 1.75 DRILL N DPRB PROD1 RIH with BHA #12 at 100 fpm, no pumps.
- SHT at 6000' MD.
13:15 - 13:40 0.42 DRILL N DPRB PROD1 Orient TF to 50 LOHS. RIH through window.
- PU 31k; SO 20k.
13:40 - 14:00 0.33 DRILL N DPRB PROD1 Orient around to drill at 90 LOHS.
14:00 - 15:00 1.00 DRILL N DPRB PROD1 Drill ahead to 10,150' MD
- 2.63/2.73 bpm
- 3400 psi
- 3200 psi free spin
15:00 - 16:00 1.00 DRILL N DPRB PROD1 PUH. Tie in.
- Correction + 1'.
- RA tag at 10102.5
16:00 - 16:15 0.25 DRILL N DPRB PROD1 Orient 90LOHS
16:15 - 20:30 4.25 DRILL N DPRB PROD1 Drill ahead
- 2.7 12.8 bpm
- 3900 psi
- 3500 psi free spin
- ROP 90
20:30 - 22:30 2.00 DRILL N DPRB PROD1 POH to dial down motor. EOB estimated at 11500'.
22:30 - 00:00 1.50 DRILL N DPRB PROD1 LD building BHA bit 2-3. Motor weak. PU new motor, bit and
restivity.
1/29/2005 00:00 - 00:30 0.50 DRILL N DPRB PROD1 RIH to 6700'. Shallow hole test, getting 10 degree clicks from
orienter.
00:30 - 02:30 2.00 DRILL N DPRB PROD1 Continue RIH. Orient HS. RIH through window to 10,155' MD.
02:30 - 02:45 0.25 DRILL N DPRB PROD1 Tie in. -3.5' correction.
02:45 - 03:30 0.75 DRILL N DPRB PROD1 MAD pass from 10,372' - 10,330' MD at 10 fph.
03:30 - 04:30 1.00 DRILL N DPRB PROD1 Drill ahead to 10,450' MD.
- TF at 90L
- 2.56/2.73 bpm at 3400 psi.
- 3000 psi free spin
- Orienter giving 10 degree clicks.
04:30 - 04:40 0.17 DRILL N DPRB PROD1 Wiper trip to 10,300' MD.
04:40 - 06:00 1.33 DRILL N DPRB PROD1 Drill ahead to 10,485' MD.
· TF at 58L
- 2.76/2.83 bpm at 3500 psi.
- 3400 psi free spin
· Orienter giving 10 degree clicks.
- 75 fph
06:00 - 06:45 0.75 DRILL N DPRB PROD1 Drill ahead to 10,525' MD.
- TF at 20L
· 2.5 I 2.6 bpm at 3400 psi.
· 3300 psi free spin
- Orienter giving 20 degree clicks.
06:45 - 07:15 0.50 DRILL N DPRB PROD1 Short trip to the window.
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/29/2005 07:15 - 07:25 0.17 DRILL N DPRB PROD1 Drill ahead to 10,540' MD.
- TF at 20L
- 2.6/2.7 bpm at 3500 psi.
- 3300 psi free spin
07:25 - 07:40 0.25 DRILL N DPRB PROD1 Orient to 80L
07:40 - 09:15 1.58 DRILL N DPRB PROD1 Drill ahead to 10,630' MD.
- TF at 80L
·2.6/2.7 bpm at 3500 psi.
- 3300 psi free spin
09:15 - 09:40 0.42 DRILL N DPRB PROD1 Short trip to window.
09:40 - 09:50 0.17 DRILL N DPRB PROD1 Orient to 90L
09:50 - 10:15 0.42 DRILL N DPRB PROD1 Drill ahead to 10,670' MD.
- TF at 90L
- 2.6/2.7 bpm at 3500 psi.
- 3300 psi free spin
10:15-10:30 0.25 DRILL N DPRB PROD1 Orient TF to 50R
10:30·11 :30 1.00 DRILL N DPRB PROD1 Drill ahead to 10,785' MD.
. TF at 50R
- 2.6/2.7 bpm at 3500 psi.
. 3300 psi free spin
Mud swap
11 :30 - 13:30 2.00 DRILL N DPRB PROD1 Wiper trip to 9000' MD (50 degree hole)
13:30 - 13:45 0.25 DRILL N DPRB PROD1 Orient 75R
13:45 - 14:30 0.75 DRILL N DPRB PROD1 Drill ahead to 10,864' MD.
- TF at 75 - 100R
- 2.6/2.7 bpm at 3700 psi.
- 3300 psi free spin
14:30 - 15:00 0.50 DRILL N DPRB PROD1 Orient TF to 80R.
15:00 - 15:45 0.75 DRILL N DPRB PROD1 Drill ahead to 10,950' MD
- TF at 75 - 100R
·2.6/2.7 bpm at 3700 psi.
- 3100 psi free spin
15:45 - 16:30 0.75 DRILL N DPRB PROD1 Wiper trip to window.
16:30 - 16:45 0.25 DRILL N DPRB PROD1 Orient to 70R.
16:45 - 17:40 0.92 DRILL N DPRB PROD1 Drill ahead 11,100'
- TF at 70R
- 2.6/2.7 bpm at 3500 psi.
- 3200 psi free spin
17:40-18:10 0.50 DRILL P PROD1 Wiper to window.
18:10 -18:20 0.17 DRILL P PROD1 Log Tie - in Correction = Zero'
18:20 - 18:55 0.58 DRILL P PROD1 Complete wiper to bottom.
18:55 - 20:00 1.08 DRILL P PROD1 Drill ahead 11250
- TF at 90R
- 2.5/2.7 bpm at 3750 psi.
- 3100 psi free spin
-190 ROP. HI ROP to hold toolface. 300' Wiper trips very 50'
drilled.
20:00 - 21 :45 1.75 DRILL P PROD1 Wiper trip to 9000' MD (50 degree hole) 2.7 bpm at 40 fpm. min
Rate thru window. RIH to window orient to 72L 10105 set
down. Fall thru. Continiue to RIH. Tag at 11244'. Good trip.
21 :45 - 21 :55 0.17 DRILL P PROD1 Orient 58R
21 :55 - 23:15 1.33 DRILL P PROD1 Drill ahead 11400
- TF at 58R
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/29/2005 21:55-23:15 1.33 DRILL P PROD1 - 2.5 12.7 bpm at 3750 psi.
- 3100 psi free spin
-204 ROP. HI ROP to hold toolface. 300' Wiper trip very 50'
drilled.
23:15 - 00:00 0.75 DRILL P PROD1 Wiper to window.
1/30/2005 00:00 - 00:20 0.33 DRILL P PROD1 Continuation of wiper to window. Hole in good shape.
00:20 - 00:30 0.17 DRILL P PROD1 Orient 103R
00:30 - 02:00 1.50 DRILL P PROD1 Drill ahead to 11550
-TFat103R
- 2.81 3.0 bpm at 3750 psi.
- 3400 psi free spin
-144 ROP. 300' Wiper trip every 50' drilled.
02:00 - 03:00 1.00 DRILL P PROD1 Orient and drill. Having trouble staying flat either wants to build
or drop. Getting tlick for click (20 degree).
03:00 - 04: 15 1.25 DRILL P PROD1 Wiper to window.
04:15 - 05:15 1.00 DRILL P PROD1 Drill ahead to 11676
- TF at 80 R
- 2.8 I 3.0 bpm at 3750 psi.
- 3400 psi free spin
-190 ROP. 300' Wiper trip every 50' drilled.
05:15·05:30 0.25 DRILL P PROD1 Orient around the clock to 60 L
05:30 - 05:45 0.25 DRILL P PROD1 Drill to 11,700
05:45 - 08: 15 2.50 DRILL P PROD1 Wiper to 9000'.
- Tie in. 0' correction.
- OH in good condition.
- PU 39k; SO 17k
08:15 - 08:30 0.25 DRILL P PROD1 Orient to 60L.
08:30 - 09:45 1.25 DRILL P PROD1 Drill ahead to 11,850' MD.
- TF at 60L - 120L
- 2.5/2.6 bpm at 3500 psi.
- 3150 psi free spin
- 160 ROP. 300' Wiper trip every 50' drilled.
09:45 - 11 :20 1.58 DRILL P PROD1 Wiper trip to window.
11 :20 - 13:00 1.67 DRILL P PROD1 Drill ahead to 12,000' MD
- TF at 80L
- 2.5/2.6 bpm at 3500 psi.
- 3150 psi free spin
- 160 ROP. 300' Wiper trip every 50' drilled.
13:00 - 15:00 2.00 DRILL P PROD1 Wiper trip to window.
15:00 - 16:00 1.00 DRILL P PROD1 Drill ahead to 12,100' MD
- TF at 140L
- 2.5/2.6 bpm at 3700 psi.
- 3250 psi free spin
- 160 ROP. 300' Wiper trip every 50' drilled.
- No losses
16:00 - 18:00 2.00 DRILL P PROD1 Final wiper trip/tie-in. TD at 12,102' MD.
- +2' correction.
- Orient through shale at 11,777' MD.
- 36k PU; 11k SO.
18:00 - 20:00 2.00 DRILL P PROD1 POH flag EOP 7889'.
20:00 - 21 :30 1.50 DRILL P PROD1 LD Drilling BHA . Static well losses 2 bph.
21 :30 - 22:00 0.50 DRILL P PROD1 Install coil connector Pull test to 35000 and PT to 3500 psi.
Printed: 217/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
1/30/2005 22:00 . 22:45 0.75 DRILL P PROD1 Pump dart 54.4 bbl actual displacement volume.
22:45 . 00:00 1.25 CASE P RUNPRD MU liner
1/31/2005 00:00 . 02:30 2.50 CASE P RUNPRD Continue to MU liner
02:30 - 03:00 0.50 CASE P RUNPRD MU running tool and stab injector.
03:00 . 04:50 1.83 CASE P RUNPRD RIH with liner. Correct to flag at end to tubing. +8'. Continue to
TD with 13K surface wt. 46K up wt.
04:50 . 05:30 0.67 CASE P RUNPRD Drop 5/8" phenolic ball and launch with 1200 psi. Displace to
liner running tool with 48.5 bbls and sheared seat with 4060
psi.
05:30 - 08:45 3.25 CASE P RUNPRD Line up and swap wellbore fluid to 2% KCI
- Rig up cementers.
08:45 - 09:00 0.25 CEMT P RUNPRD PJSM for cementing.
09:00 - 09:30 0.50 CEMT P RUNPRD Batch up 27 bbls pumpable cement.
09:30 . 10:40 1.17 CEMT P RUNPRD Pump liner cement.
· Pump 2 bbls fresh water.
· Pressure test lines to 4000 psi.
· Zero in MM.
· Pump 27.0 bbls cement at 15.8 ppg.
· Clear lines
- Load dart in reel.
- Pump 25 bbls bio water at 2.6 bpm.
- Follow with KCI at 2.3 bpm, 1400 psi.
- Zero out MM at 41 bbls.
- Slow pump at 52 bbls away, latch at 55 bbls
· Shear at 3150 psi.
- Bump plug at 68.6 bbls (calculated 68.0 bbls)
- 27 bbls behind pipe.
- Pressure up to 1000 psi, bleed off. Check floats, ok.
· Pressure up to 200 psi, unsting.
10:40 - 12:15 1.58 CEMT P RUNPRD POOH, replacing voidage.
12:15 - 12:45 0.50 CEMT P RUNPRD Lay down BHA.
12:45 - 16:00 3.25 EV AL P LOWER1 PJSM. Bring logging tools to the floor. PU logging tools and
70 joints CSH.
16:00 - 17:30 1.50 EVAL P LOWER1 MU injector. RIH with cleanout I logging assy to 8800' MD.
17:30 . 21 :45 4.25 EVAL P LOWER1 Wait on cement to reach 500 psi compressive strength.
21 :45 - 23:00 1.25 EVAL P LOWER1 LOG down from 8900 at 30 fpm to PBTD. 1.5 bpm at 1260 psi.
RIH to liner top. Unable to enter liner top. Set down no motor
work. Tried with and without motor and at various pump rates.
23:00 . 00:00 1.00 EVAL N DPRB LOWER1 Drop 5/8" AL ball to circulation sub. Circulate down at 1.5 bpm
1450 psi. After 85 bbl no go. Check launch no sign of ball.
2/1/2005 00:00·01 :10 1.17 EVAL N DPRB LOWER1 POH.
01:1 0 - 03:45 2.58 EVAL N DPRB LOWER1 Stand back injector. Stand back 35 stands of 1-1/4" CSH. Mill
balled up. No other obvious problems. Shear disc OK. Ball was
found on seat and circ sub open.
· Functioned motor at surface, all indications that motor is still
functioning properly.
03:45 - 04:45 1.00 EVAL N DPRB LOWER1 Jet stack.
04:45 - 06:00 1.25 EVAL N DPRB LOWER1 MU cleanout assembly to cleanout liner top to LSL sub. 2.7
parabolic mill, motor and 11 stands 1-1/4 CSH.
06:00 - 07:30 1.50 EVAL N DPRB LOWER1 RIH with cleanout assy, circulating minimum rate.
07:30 . 11 :00 3.50 EV AL N DPRB LOWER1 Tag at 9904' MD with weight and motor work.
Continue to RIH with minimal motor work to 9934' MD, where
motor work increased to 250 psi.
Printed: 2/7/2005 9:38: 18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
2/1/2005 07:30 - 11 :00 3.50 EV AL N DPRB LOWER1 Repeated stalls at 9942.5' MD.
Attempt time milling at 1 'Imin to get past 9942.5' MD.
- 1.5/1.6 bpm
- 1000 psi free spin.
- Clean magnets prior to time milling.
- Seeing 200 psi motor work at 9941.8' MD.
- Passed the 9942.5' stall, milling faster (45-98 fph) at 9942.2'
MD.
- By 9948' MD, RIH with no restriction to 9960' MD.
- PU to 9900' MD. RBIH at 300 fph to ensure clean re-entry
into liner top.
- Start flo pro sweep down hole.
- Continue to RIH, see motor work at 9976' MD. Stalled at
9980.6' and 9984' MD, suspect cement in X nipple.
- Continue to RIH, seeing cement (motor work andlor stall) at
each collar.
- Milling cement from 10,084' - 10, 089' MD.
- RIH to LSL sub, pumping sweeps to clean hole.
- Tag LSL at 10,477' MD. Chasing out cement with sweep.
11 :00 - 13:00 2.00 EVAL N DPRB LOWER1 POOH with cleanout assembly.
13:00 - 14:00 1.00 EVAL N DPRB LOWER1 Stand back 11 stands of 1-1/4 CSH.
14:00 - 14:30 0.50 EVAL N DPRB LOWER1 PJSM for picking up NUK tools.
14:30 - 16:00 1.50 EVAL N DPRB LOWER1 PU BHA. PU 35 stands 1-1/4 CSH.
16:00 - 17:00 1.00 EVAL N DPRB LOWER1 RIH to 8900'.
17:00 - 17:30 0.50 EVAL N DPRB LOWER1 Log down at 30 fpm .95 bpm at 780 psi. to top of liner.
17:30 - 19:00 1.50 EVAL P LOWER1 Continue logging down to PBTD 30 fpm .96 bpm @ 820 psi.
12069.7'. Motor work 12008 to 12031 and 12056 to 12069.7
19:00 - 20:00 1.00 EVAL P LOWER1 Log up 60 fpm to 8900'. .6 bpm @ 820 psi. while spotting 15
bbl new FloPro perf pill.
20:00 - 21 :00 1.00 EVAL P LOWER1 POH to hydril.
21 :00 - 23:00 2.00 EVAL P LOWER1 Stand back 8 stands CS Hydril and LD 56 joints of CS Hydril
(prep for derrick down move to Y pad)
23:00 - 23:15 0.25 EVAL P LOWER1 SAFETY MEETING. Review procedure, hazards and
mitigation for laying out SWS MCNUGR tools.
23:15 - 00:00 0.75 EVAL P LOWER1 Layout SWS memory CNUGR tools. Download MCNL data.
Good data.
PBTD at 12,066'. Top of liner at 9,938'. RA tag at 10,102'.
2/2/2005 00:00 - 01 :00 1.00 CEMT P RUNPRD Jet stack clean of cement returns.
01 :00 - 01 :30 0.50 CEMT P RUNPRD Pressure test liner lap for 30 min. good test, chart test.
Initial Press = 1990 psi, Final Press = 1880 psi. Lost 110 psi
in 30 min.
01 :30 - 02:00 0.50 PERFOB P LOWER1 Prep rig floor to run guns. Check gun layout in pipe shed. 48
gunsl blanks
02:00 - 02:15 0.25 PERFOB P LOWER1 SAFETY MEETING. Review procedure, hazards and
mitigation for running SWS 2" Perf guns.
02:15 - 04:15 2.00 PERFOB P LOWER1 MIU SWS 2", PowerJet perf guns loaded at 6 SPF, 48 guns
and blanks.
MIU SWS firing head with 5/8" ball seet.
M/U Baker Hyd Disconnect. Drifted with 5/8" ball.
04:15 - 05:30 1.25 PERFOB P LOWER1 MIU 20 stds of 1-1/4" CSH workstring.
MIU SWS MHA. MIU CT injector head.
OAL = 2,273.31 '.
05:30 - 07:15 1.75 PERFOB P LOWER1 RIH with SWS 2" Perforating guns, 6 SPF, 850' of guns.
Printed: 2/7/2005 9:38:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
C-39
C-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/4/2005
Rig Release: 2/2/2005
Rig Number: N1
Spud Date: 7/10/1993
End:
2/212005 05:30 - 07:15 1.75 PERFOB P LOWER1 Circ at 0.4 bpm, 100 psi, RIH tag bottom 12066 no correction.
07:15 - 08:00 0.75 PERFOB P LOWER1 Circulate 5/8" AI ball on seat @ 50.4 bbls. Pressure to 2880
firing guns on the move.
08:00 - 09:50 1.83 PERFOB P LOWER1 POH to Hydril. Stand back injector.
09:50 - 11 :30 1.67 PERFOB P LOWER1 LD 40 joints of CSH.
11 :30 - 11 :45 0.25 PERFOB P LOWER1 PJSM for LD perforating guns.
11 :45 - 15:30 3.75 PERFOB P LOWER1 Laydown 48 guns. All guns fired.
15:30 - 16:30 1.00 WHSUR P POST
16:30 - 20:30 4.00 WHSUR N WAIT POST
20:30 - 21 :15 0.75 WHSUR P POST
21:15 - 21:30 0.25 WHSUR P POST
21 :30 - 22:45 1.25 WHSUR P POST
22:45 - 00:00 1.25 RIGD P POST
PERFORATED INTERVALS: 11,040 - 11,340', 11,500-
12,050'.
850 FT TOTAL AT 6 PF.
R/U nozzle BHA and RIH to 2000'. Unable to get MEOH off of
trailer. Valve stuck closed.
Wait on delivery of second methanol pup trailer. Valve
frozenlfailed on MEOH trailer on location. Had to deliver two
20 bbl MEOH trailers.
Pump 32 bbls MEOH and laid in 50/50 from 2000-500'. Circ
100% to surfave and POH.
SAFETY MEETING. Review procedure, hazards and
mitigation for displacing coil to N2.
Displace fluid in coil to N2. Pump 2000 SCFPM for 12
minutes. Bleed coil press to zero.
Clean rig pits and cuttings tank, cut off CTC and set CT to
side.
N/D BOPE. N/U tree cap and pressure test.
RELEASED RIG AT 2359 HRS, 0210212005.
TOTAL DAYS FROM RIG ACCEPT TO RELEASE WAS 11
DAYS, 7-1/2 HRS.
Prep rig for derrick down rig move to Y-10A.
DIMS time summary from now on, will be under Y-10A.
Printed: 2/7/2005 9:38:18 AM
.
Halliburton Sperry-Sun
North Slope Alaska
BPXA
C-39A
Job No. AKMW3505869, Surveyed: 30 January, 2005
Survey Report
14 February, 2005
Your Ref: API 500292238301
Surface Coordinates: 5959386.65 N, 664508.47 E (70017' 43.2662" N, 148040' 04.3590
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Survey Ref: svy4494
W)
Kelly Bushing Elevation: 72.00ft above Mean Sea Level
s,,-............y-sul!
DFtTL.:.L.II\iG SiESï=tVIt::es
A Halliburton Company
Halliburton Sperry-Sun
Survey Report for C-39A
Your Ref: API 500292238301
Job No. AKMW3505869, Surveyed: 30 January, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10092.55 75.090 83.410 8878.42 8950.42 341.13 N 2558.99 E 5959783.70 N 667059.38 E 1610.38 Tie On Point
10122.54 75.670 75.800 8886.00 8958.00 346.36 N 2587.51 E 5959789.56 N 667087.78 E 24.629 1629.56 Window Point
10153.69 76.110 68.000 8893.61 8965.61 355.74 N 2616.20 E 5959799.57 N 667116.26 E 24.325 1652.37
10184.73 76.970 59.320 8900.85 8972.85 369.12 N 2643.22 E 5959813.54 N 667142.98 E 27.335 1677.76
10215.71 73.560 48.300 8908.75 8980.75 386.76 N 2667.37 E 5959831.70 N 667166.74 E 36.110 1705.32
10248.84 73.300 35.990 8918.23 8990.23 410.25 N 2688.63 E 5959855.65 N 667187.48 E 35.617 1736.40 .
10283.59 74.880 24.040 8927.79 8999.79 439.14 N 2705.30 E 5959884.89 N 667203.51 E 33.377 1769.75
10315.40 76.110 14.200 8935.77 9007.77 468.20 N 2715.37 E 5959914.16 N 667212.94 E 30.193 1799.84
10350.11 79.450 6.810 8943.13 9015.13 501 .52 N 2721.53 E 5959947.62 N 667218.38 E 22.922 1831.58
10383.01 81.320 353.020 8948.65 9020.65 533.88 N 2721.48 E 5959979.96 N 667217.61 E 41.710 1859.29
10422.62 82.290 349.150 8954.30 9026.30 572.60 N 2715.40 E 5960018.55 N 667210.69 E 9.976 1889.35
10453.36 83.260 343.330 8958.17 9030.17 602.21 N 2708.15 E 5960047.99 N 667202.79 E 19.046 1910.99
10491.67 84.140 338.750 8962.37 9034.37 638.21 N 2695.78 E 5960083.71 N 667189.63 E 12.103 1935.48
10521.46 88.280 336.990 8964.34 9036.34 665.74 N 2684.58 E 5960110.98 N 667177.84 E 15.095 1953.31
10551.02 90.480 332.050 8964.66 9036.66 692.41 N 2671.87 E 5960137.37 N 667164.55 E 18.292 1969.63
10581.92 91.980 326.590 8964.00 9036.00 718.97 N 2656.11 E 5960163.58 N 667148.21 E 18.320 1984.28
10618.01 94.010 327.650 8962.11 9034.11 749.23 N 2636.55 E 5960193.41 N 667127.99 E 6.344 2000.14
10649.41 89.690 327.300 8961.10 9033.10 775.69 N 2619.68 E 5960219.49 N 667110.54 E 13.803 2014.13
10678.42 90.660 324.300 8961.01 9033.01 799.68 N 2603.38 E 5960243.12 N 667093.72 E 10.868 2026.30
10717.36 90.040 334.170 8960.77 9032.77 833.10 N 2583.48 E 5960276.09 N 667073.10 E 25.396 2044.70
10744.47 89.250 335.580 8960.94 9032.94 857.64 N 2571.97 E 5960300.38 N 667061.06 E 5.962 2059.80
10774.10 88.990 339.460 8961.39 9033.39 885.01 N 2560.65 E 5960327.49 N 667049.13 E 13.123 2077.43
10808.82 89.600 347.210 8961.82 9033.82 918.24 N 2550.70 E 5960360.50 N 667038.46 E 22.389 2100.80 .
10843.26 91.010 349.500 8961.64 9033.64 951.97 N 2543.75 E 5960394.07 N 667030.77 E 7.808 2126.13
10881.61 90.130 354.960 8961.26 9033.26 989.95 N 2538.57 E 5960431.93 N 667024.76 E 14.420 2156.01
10920.34 89.870 1.130 8961.26 9033.26 1028.64 N 2537.24 E 5960470.58 N 667022.59 E 15.945 2188.50
10958.21 87.580 2.720 8962.10 9034.10 1066.48 N 2538.52 E 5960508.43 N 667023.04 E 7.361 2221.58
10989.66 87.930 10.470 8963.33 9035.33 1097.67 N 2542.12 E 5960539.70 N 667025.96 E 24.648 2250.18
11020.17 91.100 13.110 8963.59 9035.59 1127.53 N 2548.36 E 5960569.69 N 667031.54 E 13.520 2278.98
11050.37 91.280 18.400 8962.96 9034.96 1156.58 N 2556.55 E 5960598.91 N 667039.09 E 17.523 2308.10
11079.92 91.100 22.800 8962.35 9034.35 1184.23 N 2566.94 E 5960626.78 N 667048.88 E 14.899 2337.15
11116.91 89.960 26.860 8962.01 9034.01 1217.79 N 2582.47 E 5960660.67 N 667063.67 E 11 .400 2373.92
11156.36 89.430 33.900 8962.22 9034.22 1251.80N 2602.41 E 5960695.11 N 667082.86 E 17.896 2413.34
11197.31 89.160 37.780 8962.72 9034.72 1284.99 N 2626.38 E 5960728.81 N 667106.10 E 9.497 2454.13
11238.53 87.930 42.720 8963.77 9035.77 1316.43N 2653.00 E 5960760.83 N 667132.02 E 12.346 2494.79
14 February, 2005 - 13:58
Page 2 of 4
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for C-39A
Your Ref: API 500292238301
Job No. AKMW3505869, Surveyed: 30 January, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11275.24 89.870 47.830 8964.48 9036.48 1342.24 N 2679.06 E 5960787.21 N 667157.51 E 14.886 2530.35
11305.97 91.890 50.820 8964.00 9036.00 1362.27 N 2702.36 E 5960807.74 N 667180.37 E 11.741 2559.51
11342.90 92.950 55.580 8962.44 9034.44 1384.36 N 2731.90 E 5960830.48 N 667209.41 E 13.194 2593.66
11374.88 92.250 63.330 8960.99 9032.99 1400.59 N 2759.39 E 5960847.30 N 667236.55 E 24.308 2621.73
11408.37 91.190 65.270 8959.98 9031.98 1415.10 N 2789.55 E 5960862.47 N 667266.38 E 6.599 2649.71
11438.09 89.520 71.260 8959.80 9031.80 1426.10 N 2817.15 E 5960874.07 N 667293.73 E 20.922 2673.35 .
11473.54 86.960 75.490 8960.89 9032.89 1436.24 N 2851.09 E 5960884.95 N 667327.44 E 13.942 2699.52
11510.39 86.700 82.360 8962.93 9034.93 1443.30 N 2887.17 E 5960892.80 N 667363.36 E 18.628 2724.16
11554.45 89.520 86.240 8964.38 9036.38 1447.67 N 2930.98 E 5960898.13 N 667407.06 E 10.882 2750.46
11591.59 88.630 89.410 8964.98 9036.98 1449.08 N 2968.08 E 5960900.35 N 667444.13 E 8.864 2770.78
11628.94 88.460 95.230 8965.93 9037.93 1447.57 N 3005.37 E 5960899.65 N 667481.44 E 15.584 2788.69
11667.81 91.370 96.810 8965.99 9037.99 1443.50 N 3044.02 E 5960896.42 N 667520.17 E 8.519 2805.11
11699.47 90.840 92.940 8965.38 9037.38 1440.81 N 3075.56 E 5960894.43 N 667551.76 E 12.335 2819.04
11729.79 91.280 88.000 8964.82 9036.82 1440.56 N 3105.86 E 5960894.84 N 667582.06 E 16.355 2834.44
11763.01 91.540 86.240 8964.00 9036.00 1442.23 N 3139.03 E 5960897.23 N 667615.18 E 5.354 2852.95
11797.28 91.100 81.310 8963.21 9035.21 1445.94 N 3173.08 E 5960901.69 N 667649.14 E 14.439 2873.67
11827.74 89.870 77.430 8962.95 9034.95 1451.56 N 3203.01 E 5960907.96 N 667678.94 E 13.362 2893.90
11861.02 87.750 75.670 8963.64 9035.64 1459.30 N 3235.36 E 5960916.41 N 667711.12 E 8.278 2917.20
11902.96 86.870 73.380 8965.61 9037.61 1470.47 N 3275.74 E 5960928.47 N 667751.24 E 5.844 2947.57
11941.18 88.460 68.970 8967.17 9039.17 1482.79 N 3311.87 E 5960941.57 N 667787.09 E 12.256 2976.74
11976.84 90.480 70.560 8967.50 9039.50 1495.12 N 3345.33 E 5960954.64 N 667820.27 E 7.209 3004.54
12005.54 90.400 65.450 8967.28 9039.28 1505.87 N 3371.93 E 5960965.96 N 667846.63 E 17.807 3027.45 .
12037.02 89.960 61.220 8967.18 9039.18 1519.99N 3400.05 E 5960980.70 N 667874.44 E 13.510 3054.05
12072.60 89.160 55.230 8967.45 9039.45 1538.72 N 3430.29 E 5961000.08 N 667904.26 E 16.984 3085.67
12102.00 89.160 55.230 8967.89 9039.89 1555.48 N 3454.43 E 5961017.37 N 667928.03 E 0.000 3112.48 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 31.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 121 02.00ft.,
The Bottom Hole Displacement is 3788.49ft., in the Direction of 65.759° (True).
14 February, 2005 - 13:58
Page 3 of 4
DrillOuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for C-39A
Your Ref: API 500292238301
Job No. AKMW3505869, Surveyed: 30 January, 2005
North Slope Alaska
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
10092.55
10122.54
12102.00
8950.42
8958.00
9039.89
341.13 N
346.36 N
1555.48 N
2558.99 E
2587.51 E
3454.43 E
Tie On Point
Window Point
Projected Survey
.
Survey tool program for C-39A
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
0.00 12102.00
9039.89 MWD Magnetic (C-39)
.
14 February, 2005 - 13:58
Page 4 of 4
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
North Slope Alaska
BPXA
C-39PB1
.
Job No. AKMW3505869, Surveyed: 25 January, 2005
Survey Report
14 February, 2005
Your Ref: API 500292238371
Surface Coordinates: 5959386.65 N, 664508.47 E (70017' 43.2662" N, 148040' 04.3590" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing Elevation: 72.00ft above Mean Sea Level
.
Si-'II::::I: ·.....y-sul'1
DAIL-L.ING SERVICES
A Halliburton Company
Survey Ref: svy4493
Halliburton Sperry-Sun
Survey Report for C-39PB1
Your Ref: API 500292238371
Job No. AKMW3505869, Surveyed: 25 January, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10124.43 76.550 81.730 8886.23 8958.23 345.13 N 2589.64 E 5959788.37 N 667089.94 E 1629.59 Tie On Point
10157.00 77.440 82.490 8893.56 8965.56 349.48 N 2621.07 E 5959793.42 N 667121.27 E 3.554 1649.52 Window Point
10173.18 72.770 82.130 8897.72 8969.72 351.57 N 2636.56 E 5959795.85 N 667136.71 E 28.943 1659.29
10202.78 65.040 72.000 8908.39 8980.39 357.68 N 2663.43 E 5959802.54 N 667163.43 E 41.218 1678.36
10230.12 65.920 59.720 8919.77 8991.77 367.83 N 2686.07 E 5959813.18 N 667185.84 E 40.978 1698.72
10264.61 67.960 43.890 8933.35 9005.35 387.40 N 2710.88 E 5959833.29 N 667210.22 E 42.618 1728.27 .
10301.45 77.430 37.220 8944.31 9016.31 414.11 N 2733.67 E 5959860.49 N 667232.42 E 30.962 1762.90
10329.65 79.280 26.680 8950.02 9022.02 437.51 N 2748.25 E 5959884.21 N 667246.49 E 37.186 1790.48
10360.40 78.490 15.780 8955.96 9027.96 465.59 N 2759.17E 5959912.52 N 667256.78 E 34.875 1820.16
10390.56 73.830 7.870 8963.19 9035.19 494.21 N 2765.18 E 5959941.27 N 667262.17 E 29.778 1847.80
10419.60 77.430 355.560 8970.42 9042.42 522.27 N 2766.00 E 5959969.33 N 667262.37 E 42.882 1872.26
10453.05 84.730 344.490 8975.62 9047.62 554.73 N 2760.25 E 5960001.67 N 667255.92 E 39.288 1897.14
10488.41 91.980 334.700 8976.64 9048.64 587.80 N 2747.95 E 5960034.45 N 667242.89 E 34.428 1919.14
10524.79 91.010 327.650 8975.69 9047.69 619.64 N 2730.42 E 5960065.90 N 667224.68 E 19.555 1937.41
10556.02 94.100 322.720 8974.29 9046.29 645.24 N 2712.62 E 5960091.11 N 667206.32 E 18.616 1950.18
10587.88 94.360 326.240 8971.94 9043.94 671.10 N 2694.16 E 5960116.56 N 667187.30 E 11.048 1962.84
10626.05 93.570 331.700 8969.30 9041.30 703.72 N 2674.54 E 5960148.74 N 667166.97 E 14.419 1980.69
10658.61 92.860 336.640 8967.47 9039.47 732.97 N 2660.38 E 5960177.67 N 667152.17 E 15.304 1998.48
10692.99 93.220 343.510 8965.65 9037.65 765.22 N 2648.69 E 5960209.66 N 667139.78 E 19.982 2020.10
10724.15 94.450 347.210 8963.56 9035.56 795.30 N 2640.83 E 5960239.56 N 667131.26 E 12.488 2041.83
10762.51 91.100 352.500 8961.70 9033.70 833.00 N 2634.09 E 5960277.10 N 667123.70 E 16.308 2070.68
10792.31 89.070 353.380 8961.66 9033.66 862.57 N 2630.43 E 5960306.59 N 667119.39 E 7.425 2094.14 .
10821.02 90.660 359.720 8961.73 9033.73 891.21 N 2628.70 E 5960335.18 N 667117.04 E 22.766 2117.80
10859.32 90.480 4.830 8961.35 9033.35 929.47 N 2630.22 E 5960373.46 N 667117.72 E 13.350 2151.37
10899.54 90.570 12.050 8960.98 9032.98 969.22 N 2636.12 E 5960413.34 N 667122.75 E 17.952 2188.49
10938.44 91.190 18.930 8960.38 9032.38 1006.68 N 2646.50 E 5960451.02 N 667132.30 E 17.756 2225.95
10971.07 88.280 18.220 8960.53 9032.53 1037.61 N 2656.89 E 5960482.16 N 667142.02 E 9.180 2257.81
11003.40 87.930 26.150 8961.60 9033.60 1067.51 N 2669.09 E 5960512.32 N 667153.55 E 24.539 2289.71
11034.15 87.400 30.200 8962.85 9034.85 1094.58 N 2683.59 E 5960539.71 N 667167.46 E 13.272 2320.39
11060.18 88.990 36.720 8963.68 9035.68 1116.28 N 2697.93 E 5960561.71 N 667181.32 E 25.769 2346.37
11085.00 88.990 36.720 8964.11 9036.11 1136.17 N 2712.76 E 5960581.92 N 667195.72 E 0.000 2371.06 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
14 February, 2005 - 13:55 Page 2 of 3 DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for C-39PB1
Your Ref: API 500292238371
Job No. AKMW3505869, Surveyed: 25 January, 2005
North Slope Alaska
BPXA
Vertical Section is from Well Reference and calculated along an Azimuth of 31.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11085.00ft.,
The Bottom Hole Displacement is 2941.08ft., in the Direction of 67.275° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
.
10124.43
10157.00
11085.00
8958.23
8965.56
9036.11
345.13 N
349.48 N
1136.17 N
2589.64 E
2621.07 E
2712.76 E
Tie On Point
Window Point
Projected Survey
Survey tool program for C-39PB1
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
0.00 11085.00
9036.11 MWD Magnetic (C-39)
.
14 February, 2005 - 13:55
Page 3 of 3
DríllQuest 3.03.06.008
4-1/2" -5M
erN
WELLHEAD = 13-5/8" -5M FMC
ACTUA TOR = ?
,...~u
KB. ELBI =
BF. ELBI =
KOP=
u~",...__ ~<.__.__.~
Max Angle =
Datum MD =
Datum 'TVD =
.
TREE =
72'
34'
6077'
'~"n····_·_~m "
94 @ 10618'
9828'
8800' SS
13-3/8" CSG, 68#, L-80, ID = 12.415" H 3202'
Minimum Ie = 2.37" @ LSL XO
at 10,476' at STL Pin.
-
r-'
TOP OF 7" LNR H 8867' r----.
9-518" CSG, 47#, NT-80, ID = 8.681" H 9063' ~
TOPOF 3-3116" LN~-i 9939'ElM I
Top of Cement H TOL I
14-1/2" TBG, 12.6#, L-80, NSCT, 11 9962'
0.0152 bpf, ID = 3.958"
135" X Nip 2313" IDH 997S'ElM
ÆRFORA TION SUMMARY
REF LOG: SWS MCNL/GR OF 02102/2005
ANGLEATTOPÆRF: 91 Deg. @ 11,040'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2 6 11,040 - 11,340' OPEN 02/02105
2 6 11.500 - 12,050' OPEN 02102105
10360' 1-f7" X 3-1/2" BAKER MODEL D PKR, ID = 3.25"
z
7" LNR, 29#, NT-80, NSCC, 0.0371 bpf, ID = 6.184" H 10505' I ·
I PBTD H 11610'
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" H 11632'
DATE
08/08/93
09/16/01
07104/03
09/15/03
01/28/05
RBI BY COMMENTS
ORIGINAL COMPLETION
RN/TP CORRECTIONS
CMOffiP MAX ANGLE, KB ELBlATION
CMOffiP REF LOG CORRECTION
MSE PROPOSED CTD SIDETRACK
DATE
02102/05
. SPfEJYMJIE ~ÞLVIB.L.B:Æ
.
2179' H 4-112" SSSV, OTIS LANDING NIP, ID = 3.813" I
L
ST MD 'TVD
2 3981 3911
1 6975 6848
GAS LIFT MANDRELS
DBI TV PE VL V LATCH PORT DA TE
1 OTIS RA
25 OTIS RA
..---i 8967' H BAKER Hiv1C L TPIHNGR I
~
9873' H 4-1/2" NIP, SWS, ID = 3.813" I
't
9924'
H 7" X 4-1/2" PKR, BAKER SABL-3, ID = 3.87"
H
H
H
I
I
I
10,092' 1-1 Baker GenII whipstock
10146' - Pushed whipstock to bottom I
10151' - Baker Gen II damaged whipstock I
10359' - Baker DB locating pkr plug I
~
I
I
I
I
I
I
I
I
~
I
I
I
I
I
I
I
I
~
RBI BY
RRW
COMMENTS
CTD HORIZONTAL SIDETRACK
3-31'16" X 2-718" cmt'ed and perfedH 12,102' I
PRUDHOE BA Y UNIT
WELL: C-39A
ÆRMIT No: 205-003
API No: 50-029-22383-01
SEC 19, T11N, R14E, 1835' FNL & 1222' FEL
BP Exploration (Alaska)
.
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
.
DEFINITIVE
Re: Distribution of Survey Data for Well C-39A
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
10,092.55' MD
10,122.54' MD
12,102.00' MD
(if applicable)
21-Feb-05
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Signed 1LJ ()iLJ
Date ~ 9 ~';¿ðOr
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
~ û1--\:)~-'::.
.
.
21-Feb-05
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well C-39A PB1
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
10,124.43' MD
10,157.00' MD
11,085.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date Å 9 ~~\)j¡~ >-
Signed ~1 (JlLJ
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
~ ~ ç~ Ò \\ )
ObP
.
.
Baker Hughes INTEQ
Baker Hughes INTEQ Survey Report
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Prudhoe Bay
PB C Pad
C-39
C-39A
Date: 2/16/2005 Time: 16: 11 :24 Page: 1
Co-ordinate(NE) Reference: Well: C-39, True North
Vertical (TVD) Reference: 47: 397/10/199300:0072.0
Section (VS) Reference: Well (0.OON,O.OOE,31.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: PB C Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5957218.72 ft
662550.03 ft
Latitude: 70 17
Longitude: 148 41
North Reference:
Grid Convergence:
BÍI.
BAKU
IUGHIS
.----.-----.-
INTEQ ;;<. ~ ç- ~I.';, J
Alaska, Zone 4
Well Centre
bggm2004
22.367 N
2.797 W
True
1.24 deg
Well: C-39 Slot Name: 39
C-39
Well Position: +N/-S 2125.23 ft Northing: 5959386.65 ft Latitude: 70 17 43.266 N
+E/-W 2004.99 ft Easting : 664508.47 ft Longitude: 148 40 4.359 W
Position Uncertainty: 0.00 ft
Wellpath: C-39A
500292238301
Current Datum: 47: 397/10/199300:00
Magnetic Data: 12/15/2004
Field Strength: 57624 nT
Vertical Section: Depth From (TVD)
ft
39.00
Height 72.00 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
+N/-S
ft
0.00
C-39
10092.50 ft
Mean Sea Level
24.95 deg
80.84 deg
Direction
deg
31.00
Survey Program for Definitive Well path
Date: 2/1/2005 Validated: No Version:
Actual From To Survey Toolcode Tool Name
ft ft
493.10 10092.50 1: MWD - Standard (493.10-11632.00) (0) MWD MWD - Standard
10122.54 12072.60 Survey (10122.54-12072.60) MWD MWD - Standard
Annotation
MD TVD
ft ft
10092.50 8950.41 KOP
12102.00 0.00 TD - Projected Depth
Survey: Survey Start Date: 1/24/2005
MWD
Company: Sperry Sun Engineer:
Tool: MWD;MWD - Standard Tied-to: From: Definitive Path
Survey
MD Incl Azim TVD SSTVD N/S EfW MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/10OO
10092.50 75.09 83.41 8950.41 8878.41 341.14 2558.94 5959783.69 667059.16 1610.36 0.00 MWD
10122.54 75.67 75.80 8958.00 8886.00 346.38 2587.51 5959789.56 667087.60 1629.57 24.58 MWD
10153.69 76.11 68.00 8965.61 8893.61 355.76 2616.20 5959799.56 667116.07 1652.39 24.32 MWD
10184.73 76.97 59.32 8972.85 8900.85 369.14 2643.22 5959813.53 667142.79 1677.78 27.33 MWD
10215.71 73.56 48.30 8980.75 8908.75 386.78 2667.37 5959831.69 667166.55 1705.33 36.11 MWD
10248.84 73.30 35.99 8990.23 8918.23 410.27 2688.63 5959855.64 667187.29 1736.42 35.62 MWD
10283.59 74.88 24.04 8999.79 8927.79 439.15 2705.30 5959884.88 667203.32 1769.76 33.38 MWD
10315.40 76.11 14.20 9007.77 8935.77 468.21 2715.37 5959914.15 667212.75 1799.85 30.19 MWD
10350.11 79.45 6.81 9015.13 8943.13 501.54 2721.53 5959947.60 667218.18 1831.60 22.92 MWD
10383.01 81.32 353.02 9020.65 8948.65 533.89 2721.47 5959979.95 667217.42 1859.30 41.71 MWD
10422.62 82.29 349.15 9026.30 8954.30 572.62 2715.40 5960018.52 667210.50 1889.36 9.98 MWD
10453.36 83.26 343.33 9030.17 8958.17 602.22 2708.15 5960047.96 667202.60 1911.01 19.05 MWD
. . B¡¡¡.
ObP Baker Hughes INTEQ IJAKR
HUGHIS
Baker Hughes INTEQ Survey Report INTEQ
Company: BP Amoco Date: 2/16/2005 Time: 16:11 :24 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: C-39, True North
Site: PB C Pad Vertical (TVD) Reference: 47: 397/10/199300:0072.0
Well: C-39 Section (VS) Reference: Well (0.00N,O.00E,31.00Azi)
Wellpath: C-39A Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/1 000
10491.67 84.14 338.75 9034.37 8962.37 638.23 2695.78 5960083.68 667189.44 1935.49 12.10 MWD
10521.46 88.28 336.99 9036.34 8964.34 665.75 2684.58 5960110.96 667177.65 1953.32 15.10 MWD
10551.02 90.48 332.05 9036.66 8964.66 692.43 2671.87 5960137.34 667164.36 1969.64 18.29 MWD
10581.92 91.98 326.59 9036.00 8964.00 718.99 2656.11 5960163.55 667148.03 1984.29 18.32 MWD
10618.01 94.01 327.65 9034.11 8962.11 749.25 2636.55 5960193.38 667127.80 2000.16 6.34 MWD
10649.41 89.69 327.30 9033.10 8961.10 775.71 2619.68 5960219.45 667110.36 2014.14 13.80 MWD
10678.42 90.66 324.30 9033.01 8961.01 799.70 2603.37 5960243.08 667093.54 2026.31 10.87 MWD
10717.36 90.04 334.17 9032.77 8960.77 833.11 2583.48 5960276.05 667072.92 2044.71 25.40 MWD
10744.47 89.25 335.58 9032.94 8960.94 857.66 2571.97 5960300.34 667060.87 2059.82 5.96 MWD
10774.10 88.99 339.46 9033.39 8961.39 885.03 2560.64 5960327.45 667048.95 2077.45 13.12 MWD
10808.82 89.60 347.21 9033.82 8961.82 918.26 2550.70 5960360.46 667038.28 2100.81 22.39 MWD
10843.26 91.01 349.50 9033.64 8961.64 951.99 2543.75 5960394.02 667030.59 2126.14 7.81 MWD
10881.61 90.13 354.96 9033.26 8961.26 989.97 2538.56 5960431.88 667024.58 2156.03 14.42 MWD
10920.34 89.87 1.13 9033.26 8961.26 1028.66 2537.24 5960470.53 667022.41 2188.51 15.94 MWD
10958.21 87.58 2.72 9034.10 8962.10 1066.50 2538.51 5960508.38 667022.86 2221.60 7.36 MWD
10989.66 87.93 10.47 9035.33 8963.33 1097.69 2542.12 5960539.64 667025.78 2250.19 24.65 MWD
11020.17 91.10 13.11 9035.59 8963.59 1127.55 2548.35 5960569.63 667031.36 2279.00 13.52 MWD
11050.37 91.28 18.40 9034.96 8962.96 1156.60 2556.55 5960598.85 667038.91 2308.12 17.52 MWD
11079.92 91.10 22.80 9034.35 8962.35 1184.24 2566.94 5960626.71 667048.70 2337.17 14.90 MWD
11116.91 89.96 26.86 9034.01 8962.01 1217.81 2582.47 5960660.60 667063.49 2373.93 11.40 MWD
11156.36 89.43 33.90 9034.22 8962.22 1251.82 2602.41 5960695.04 667082.68 2413.36 17.90 MWD
11197.31 89.16 37.78 9034.72 8962.72 1285.00 2626.38 5960728.74 667105.91 2454.15 9.50 MWD
11238.53 87.93 42.72 9035.77 8963.77 1316.44 2652.99 5960760.76 667131.83 2494.81 12.35 MWD
11275.24 89.87 47.83 9036.413 8964.48 1342.26 2679.06 5960787.14 667157.33 2530.36 14.89 MWD
11305.97 91.89 50.82 9036.0C 8964.00 1362.29 2702.36 5960807.66 667180.18 2559.53 11.74 MWD
11342.90 92.95 55.58 9034.44 8962.44 1384.38 2731.90 5960830.40 667209.22 2593.68 13.19 MWD
11374.88 92.25 63.33 9032.99 8960.99 1400.61 2759.39 5960847.22 667236.35 2621.74 24.31 MWD
11408.37 91.19 65.27 9031.913 8959.98 1415.12 2789.55 5960862.39 667266.19 2649.72 6.60 MWD
11438.09 89.52 71.26 9031.8C 8959.80 1426.12 2817.14 5960873.99 667293.53 2673.36 20.92 MWD
11473.54 86.96 75.49 9032.89 8960.89 1436.26 2851.09 5960884.86 667327.24 2699.53 13.94 MWD
11510.39 86.70 82.36 9034.92 8962.93 1443.32 2887.17 5960892.72 667363.16 2724.17 18.63 MWD
11554.45 89.52 86.24 9036.313 8964.38 1447.69 2930.98 5960898.04 667406.86 2750.48 10.88 MWD
11591.59 88.63 89.41 9036.913 8964.98 1449.10 2968.08 5960900.27 667443.92 2770.80 8.86 MWD
11628.94 88.46 95.23 9037.92 8965.93 1447.59 3005.37 5960899.57 667481.23 2788.71 15.58 MWD
11667.81 91.37 96.81 9037.99' 8965.99 1443.51 3044.02 5960896.34 667519.96 2805.12 8.52 MWD
11699.47 90.84 92.94 9037.313 8965.38 1440.82 3075.56 5960894.34 667551.54 2819.06 12.34 MWD
11729.79 91.28 88.00 9036.82 8964.82 1440.58 3105.86 5960894.76 667581.84 2834.45 16.35 MWD
11763.01 91.54 86.24 9036.00 8964.00 1442.24 3139.03 5960897.15 667614.96 2852.96 5.35 MWD
11797.28 91.10 81.31 9035.21 8963.21 1445.96 3173.08 5960901.61 667648.92 2873.68 14.44 MWD
11827.74 89.87 77.43 9034.95 8962.95 1451.58 3203.00 5960907.88 667678.72 2893.91 13.36 MWD
11861.02 87.75 75.67 9035.64 8963.64 1459.31 3235.36 5960916.33 667710.89 2917.21 8.28 MWD
11902.96 86.87 73.38 9037.61 8965.61 1470.49 3275.73 5960928.38 667751.01 2947.58 5.84 MWD
11941.18 88.46 68.97 9039.17 8967.17 1482.81 3311.87 5960941.49 667786.86 2976.76 12.26 MWD
11976.84 90.48 70.56 9039.50 8967.50 1495.14 3345.32 5960954.55 667820.04 3004.56 7.21 MWD
12005.54 90.40 65.45 9039.28 8967.28 1505.89 3371.93 5960965.87 667846.40 3027.47 17.81 MWD
12037.02 89.96 61.22 9039.18 8967.18 1520.01 3400.05 5960980.61 667874.20 3054.06 13.51 MWD
12072.60 89.16 55.23 9039.45 8967.45 1538.74 3430.28 5960999.99 667904.02 3085.68 16.98 MWD
..
ObP
. .
Baker Hughes INTEQ
Baker Hughes INTEQ Survey Report
lliii.
8AKE1t
HUGHH
INTEQ ).f:Jr- ð~J
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Prudhoe Bay
PB C Pad
C-39
C-39APB 1
Date: 2/16/2005 Time: 16:10:18 Page: 1
Co-ordinate(NE) Reference: Well: C-39, True North
Vertical (TVD) Reference: 47: 397/10/199300:0072.0
Section (VS) Reference: Well (0.00N,O.00E,31.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: PB C Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5957218.72 ft
662550.03 ft
Latitude: 70 17
Longitude: 148 41
North Reference:
Grid Convergence:
Alaska, Zone 4
Well Centre
bggm2004
22.367 N
2.797 W
True
1.24 deg
Well: C-39 Slot Name: 39
C-39
Well Position: +N/-S 2125.23 ft Northing: 5959386.65 ft Latitude: 70 17 43.266 N
+E/-W 2004.99 ft Easting : 664508.47 ft Longitude: 148 40 4.359 W
Position Uncertainty: 0.00 ft
Wellpath: C-39APB1
500292238370
Current Datum: 47: 397/10/199300:00
Magnetic Data: 1/26/2005
Field Strength: 57628 nT
Vertical Section: Depth From (TVD)
ft
39.00
Height 72.00 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
+N/-S
ft
0.00
C-39
10157.00 ft
Mean Sea Level
24.90 deg
80.84 deg
Direction
deg
31.00
Survey Program for Definitive Wellpath
Date: 2/1/2005 Validated: No Version: 6
Actual From To Survey Toolcode Tool Name
ft ft
493.10 10157.00 1 : MWD - Standard (493.10-11632.00) (0) MWD MWD - Standard
10173.18 11060.18 MWD (10173.18-11060.18) MWD MWD - Standard
Annotation
MD TVD
ft" ft
10157.00 8965.56 KOP
11085.00 0.00 TD - Projected Depth
Survey: MWD Start Date: 1/24/2005
Company: Sperry Sun Engineer:
Tool: MWD;MWD - Standard Tied-to: From: Definitive Path
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/1QOft
10157.00 77 .45 82.52 8965.56 8893.56 349.49 2621.07 5959793.40 667121.08 1649.53 0.00 MWD
10173.18 72.77 82.13 8969.72 8897.72 351.58 2636.56 5959795.83 667136.53 1659.29 29.02 MWD
10202.78 65.04 72.00 8980.39 8908.39 357.69 2663.43 5959802.52 667163.25 1678.36 41.22 MWD
10230.12 65.92 59.72 8991.77 8919.77 367.84 2686.07 5959813.17 667185.66 1698.73 40.98 MWD
10264.61 67.96 43.89 9005.35 8933.35 387.41 2710.88 5959833.27 667210.03 1728.28 42.62 MWD
10301.45 77.43 37.22 9016.31 8944.31 414.12 2733.67 5959860.47 667232.23 1762.91 30.96 MWD
10329.65 79.28 26.68 9022.01 8950.01 437.52 2748.25 5959884.19 667246.30 1790.48 37.19 MWD
10360.40 78.49 15.78 9027.96 8955.96 465.60 2759.17 5959912.49 667256.59 1820.17 34.87 MWD
10390.56 73.83 7.87 9035.18 8963.18 494.22 2765.18 5959941.24 667261.98 1847.80 29.78 MWD
10419.60 77.43 355.56 9042.42 8970.42 522.28 2766.00 5959969.31 667262.18 1872.27 42.88 MWD
10453.05 84.73 344.49 9047.61 8975.61 554.74 2760.25 5960001.64 667255.73 1897.14 39.29 MWD
10488.41 91.98 334.70 9048.63 8976.63 587.81 2747.95 5960034.42 667242.70 1919.15 34.43 MWD
. . Bii.
.. ObP Baker Hughes INTEQ BAKU
.. IUGtIU
Baker Hughes INTEQ Survey Report --~----
INTEQ
Company: BP Amoco Date: 2/16/2005 Time: 16:10:18 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: C-39, True North
Site: PB C Pad Vertical (TVO) Reference: 47: 397/10/199300:0072.0
Well: C-39 Section (VS) Reference: Well (0.00N,O.OOE,31.00Azi)
Wellpath: C-39APB1 Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/10OO
10524.79 91.01 327.65 9047.68 8975.68 619.65 2730.42 5960065.87 667224.49 1937.41 19.55 MWD
10556.02 94.10 322.72 9046.29 8974.29 645.25 2712.62 5960091.07 667206.13 1950.19 18.62 MWD
10587.88 94.36 326.24 9043.94 8971.94 671.11 2694.16 5960116.52 667187.11 1962.85 11.05 MWD
10626.05 93.57 331.70 9041.30 8969.30 703.72 2674.54 5960148.70 667166.78 1980.70 14.42 MWD
10658.61 92.86 336.64 9039.47 8967.47 732.98 2660.38 5960177.63 667151.99 1998.48 15.30 MWD
10692.99 93.22 343.51 9037.64 8965.64 765.23 2648.69 5960209.62 667139.59 2020.11 19.98 MWD
10724.15 94.45 347.21 9035.56 8963.56 795.31 2640.83 5960239.51 667131.08 2041.84 12.49 MWD
10762.51 91.10 352.50 9033.70 8961.70 833.01 2634.09 5960277.05 667123.52 2070.68 16.31 MWD
10792.31 89.07 353.38 9033.66 8961.66 862.58 2630.43 5960306.53 667119.21 2094.14 7.42 MWD
10821.02 90.66 359.72 9033.72 8961.72 891.22 2628.70 5960335.13 667116.85 2117.81 22.77 MWD
10859.32 90.48 4.83 9033.34 8961.34 929.48 2630.22 5960373.41 667117.54 2151.38 13.35 MWD
10899.54 90.57 12.05 9032.97 8960.97 969.23 2636.12 5960413.28 667122.56 2188.50 17.95 MWD
10938.44 91.19 18.93 9032.38 8960.38 1006.69 2646.50 5960450.96 667132.12 2225.95 17.76 MWD
10971.07 88.28 18.22 9032.53 8960.53 1037.62 2656.89 5960482.10 667141.83 2257.81 9.18 MWD
11003.40 87.93 26.15 9033.60 8961.60 1067.51 2669.09 5960512.25 667153.37 2289.72 24.54 MWD
11034.15 87.40 30.20 9034.85 8962.85 1094.59 2683.59 5960539.64 667167.27 2320.40 13.27 MWD
11060.18 88.99 36.72 9035.67 8963.67 1116.29 2697.93 5960561.64 667181.13 2346.38 25.77 MWD
· III
~ ~ !Æ ~ ¡ (ill ~ !Æ: fÆ ~ æ fÆ / FRANK K MURKOWSKI, GOVERNOR
AI,AI'iIi.& OIL AND GAS /
CONSERVATION COMMISSION /
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Mary Endacott
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay C-39A
BP Exploration (Alaska) Inc.
Permit No: 205-003
Surface Location: 1835' SNL, 883' WEL, SEC. 19, TIIN, RI4E, UM
Bottomhole Location: 266' SNL, 2482' EWL, SEC. 20, TIIN, RI4E, UM
Dear Ms. Endacott:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to . n ss any required test. Contact the
Commission's petroleum field inspector at (907) 659-36 (p er).
Si
DATED this I ~ of January, 2005
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
I/.JGA- ¡ I ~1 1..005
. STATE OF ALASKA .
ALAS~IL AND GAS CONSERVATION Cè1JMISSION
PERMIT TO DRILL
1b. currentW;I?c~C 25.005 0 Exploratory aa Deve~~~~fgl¡ &r¥~\!I~&~~0~2m!Tj¡~~¡ðn
o Stratigraphic Test 0 Service 0 Development Gas iãm¡fj~e
5. Bond: 181 Blanket 0 Single Well 11. Well Name and Number:
Bond No. 2S100302630-277 C-39A /
6. Proposed Depth: 12. Field / Pool(s):
MD 12000 TVD 897055 Prudhoe Bay Field 1 Prudhoe Bay
7. Property Designation: Pool
ADL 028305
13. Approximate Spud Date:
January 14, 2005 /
14. Distance to Nearest Property:
20,930'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 72' feet C-34 is 787' away at 11015' MD
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3230 Surface: 2355 /
$ètting Qepth
Top .. .... ... Bottom
MD TVD MD TVD (including stage data)
9940' 8836' 12000' 8970' 101 cu ft Class 'G'
o Drill II Redrill
1 a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1835' SNL, 883' WEL, SEC. 19, T11N, R14E, UM
Top of Productive Horizon:
1595' SNL, 877' EWL, SEC. 20, T11N, R14E, UM
Total Depth:
266' SNL, 2482' EWL, SEC. 20, T11N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 664508 y- 5959387 Zone- ASP4
16. Deviated Wells: Kickoff Depth: 10150 feet
Maximum Hole Angle: 94 de.£rees
8. Land Use Permit:
9. Acres in Property:
2560
18. Casing Program:
Size
Hole CasinQ
4-1/8" x 3-3/4" 3-3/16" x 2-7/8"
Weight
6.2# 16.16#
Specifications
Grade Coupling Length
L-80 TCIII STL 2060'
F~ECE:IVED
JAN 0 5 Z005
PRESENT WELL CONDITION SUMMARY (To beool'Ylpleted for RedrillAND Recerttry OperatiOns)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD
11632 9031 None 11610 9029
Structural
Conductor 78' 20" 280 cu ft Arcticset (Approx.) 110' 110'
Surface 3168' 13-3/8" 1883 cu ft PF 'E', 483 cu ft Class 'G' 3202' 3201'
Intermediate 9030' 9-518" 1112 cu ft PF 'E', 343 cu ft Class 'G' 9063' 8463'
Production
Liner 1638' 7" 370 cu ft Class 'G' 8867' - 10505' 8338' - 9017'
Liner 1241' 4-1/2" Uncemented Slotted Liner 10391' - 11632' 9006' - 9031'
IPerfOration Depth TVD (ft): Slotted: 9016' - 9029'
181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report 181 Drilling Fluid Program 18120 AAC 25.050 Requirements
Perforation Depth MD (ft): Slotted: 10502' - 11609'
20. Attachments 181 Filing Fee, $100 181 BOP Sketch
o Property Plat 0 Diverter Sketch
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Mary Endacott " Title CT Drilling Engineer
Phone
564-4388
CHI -/
Date DS/05
Prepared By Name/Number:
Terrie Hubble, 564-4628
Permit To Drill
Number: :?/"J~ -oi'?3 50- 029-22383-01-00
Conditions of Approval: Samples R uired 0 Yes)gNo
Hydro Sui Ide Measures ~es 0 No
E (? ';00 fit'.
Permit Appçoval¡ /
Date: //1')..-/ t7.5
Mud Log Required
Directional Survey Required
'-
OR\G\NAf
APPROVED BY
THE COMMISSION
Date:
Contact Mary Endacott, 564-4388
See cover letter for
other requirements
o Yes ~No
)8rYes D No
Date iii~
.
BP
C-39A Sidetrack
.
Mud Program:
· Milling: 8.4 - ~.8 .. pg brine with biozan
· Drilling: 8.5 Ci! ppg FIo Pro
Disposal:
· All drilling and completion fluids and all other Class n wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
· 33/16" x 2 7/8" solid cemented liner com~· 9,940'-12,000'. /
· The liner cement volume is planned to b -18 Is of 15.8 ppg class G.
CasimJlLiner Information / .
13 3/8", L-80, 68#, Burst 5020 psi; collapse 2260 psi
95/8", NT-80 47#, Burst 6870, collapse 4750 psi
7", NT-80, 29#, Burst 8160, collapse 7020 psi
Planned Liner
33/16" L-80 TCn, 6.2#, Burst 8520 psi; collapse 7660 psi (hole size 4.125")
2 7/8" L-80 STL 6.16#, Burst 10570 psi; collapse 11170 psi (hole size 3.75")
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. /
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 94 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
· Distance to nearest property line: 20,930 ft
· Distance to nearest well (C-34) within pool: 787 ft at 11015ft
Logging
· MWD directional Gamma Ray and Resistivity will be run over all of the openhole section.
· MCNL will be run cased hole.
Hazards
· C pad is ~designated as an HzS pad. /
· Lost circulation risk is considered low.
Reservoir Pressure
· Res. press. is estimated to be 3230 psi at 88oo'ss (7.1 ppg EMW). /
Max. surface pressure with gas (0.10 psi/ft) to surface is 2355 psi.
,
,
,
\
,
\
,
,
,
,
\
,
\
,
, ,
\,/,
H 11610' -'V
H 11632' I
.
TREE = 4-112" -5M
WELLHEAD = 13-5/8" -5M FMC
AcrUATÒR = ?
KB. ELEV = 72'
-SF ELEv;; -.. 34'
KOP = 6077'
Max A~gle = __~4 ~ 1!P12'
Datum MO = 9828'
-Oatì.mlTŸ 0 = 88òõ~ss
C-39
.
-
13-3/8" CSG, 68#, L-80,10 = 12.415" H 3202' ~
Minimum ID = 3.25" @ 10360'
7" X 3-112" BAKER MODEL D PKR
L
-
I TOP OF 7" LNR H 8867' r---,-
9-5/8" CSG, 47#, NT-80, 10= 8.681" H 9063' r----
I
z ~
4-1/2" TBG, 126#, L-80, .0152 bpf, 10 = 3.958" I-{ 9962'
ZI ~
TOP OF 4-1/2" LNR K 10391' ~ ~
7" LNR, 29#, NT-80, .0371 bpf, 10= 6.184" H 10505' ~ ~
PERFORATION SUMVIARY
REF LOG:
A I\K3LE A T TOP ÆRF: 86 @ 10502'
Note: Refer to Production DB for historcal perf data
SIZE SPF NTERVAL Opn/Sqz DATE
4-1/2" SL TO 10502 - 11609 SL 10 08/05/93
\
\
,
\
,
,
,
,
,
,
\
,
\
I PB10
4-1/2" LNR, 12.6#, L-80, .0152 bpf, 10= 3.953"
DClTE
08108/93
09116/01
07/04/03
09115/03
REV BY COMM8'JTS
ORIGINAL COM PL ET ION
RNI1P CORRECllONS
CrvD/1LP MAX ANGlE, KB ELEV ATION
CrvDJlLP REF LOG CORRECTION
DATE
REV BY
COMIvENTS
.
SAFElY NOTE: HORIZONTAL WELLBORE, SL TD LNR
2179' H 4-1/2"SSSV,OTISLANONGNIP,10=3.813" I
ST rvo TVO
2 3981 3911
1 6975 6848
GAS LIFT MANDRELS
OEV TYPE VLV LATa; PORf
1 OTIS RA
25 OTIS RA
DATE
~
9873' H 4-1/2" NIP, SWS, 10= 3.813" I
9924' H 7" X 4-1/2" A<R, BAKER SABL-3, ID = 3.87"
9957' H 4-1/2" NIP, SW$, ID= 3.813" I
9962' H 4-1/2" TLBII\K3 TA IL, WLEG I
9973' H ELMO TT LOGG8) 01/26/96 I
10360' ~7" X 3-1/2" BAKER MODEL DPKR, ID= 3.25"
SET FOR POSSIBLE SlU STRA DOLE
10391' H 7" X4-1/2"PKR, BAKER I
PRUDHOE BAY lJ'Jrr
WELL: C-39
PERMT t-.b: 1930940
API t-.b: 50-029-22383-00
SEC 19, T11 N, R14E, 1835' FNL & 1222' FEL
BP Exploration (Alaska)
4-1/2" -5M
13-5/8" -5M FIViC
NOTE:
13-318"
ST MD WD
2 3981 3911
1 6848
DATE
TOP OF 7" LNR
9-5/8"
47#,
Ii.,
4·1/2"
g
~
!
I
T'
12.13#,
PERFORATION SUMMARY
REF LOG:
ANGLE AT TOP
Note; Refer to
SIZE SPF
4-1/2" SL TO
DB
INTERVAL
10502 11609
10502'
perf data
LNR
7"
7n
¡ PBTO
¡
I
!
i
I
I
I
,
~
LNR, L-80,
sa:::
MSE
CTO
.
.
BP-GDB
Baker Hughes INTEQ Planning Report
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Goo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: PB C Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5957218.72 ft
662550.03 ft
Latitude: 70 17
Longitude: 148 41
North Reference:
Grid Convergence:
Alaska, Zone 4
Well Centre
bggm2004
22.367 N
2.797 W
True
1.24 deg
Well: C-39 Slot Name: 39
C-39
Well Position: +N/-S 2125.23 ft Northing: 5959386.65 ft Latitude: 70 17 43.266 N
+E/-W 2004.99 ft Easting : 664508.47 ft Longitude: 148 40 4.359 W
Position Uncertainty: 0.00 ft
Wellpath: Plan #2 C-39A
500292238301
Current Datum: 47: 397/10/199300:00
Magnetic Data: 12/15/2004
Field Strength: 57624 nT
Vertical Section: Depth From (TVD)
ft
39.00
Height 72.00 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
+N/-S
ft
0.00
Targets
C-39
10060.39 ft
Mean Sea Level
24.95 deg
80.84 deg
Direction
deg
31.00
Annotation
10060.39
10150.00
10170.00
10210.00
10462.40
10620.00
11681.00
12000.00
8941.96
8964.03
8968.74
8981.43
9042.00
9042.00
9042.00
9042.00
TIP
KOP
3
4
5
6
7
TD
Plan: Plan #2
Lamar's Plan
Principal: Yes
Date Composed:
Version:
Tied-to:
Plan Section Information
12/15/2004
4
From: Definitive Path
10060.39 74.40 82.75 8941.96 337.40 2528.19 0.00 0.00 0.00 0.00
10092.55 75.09 83.41 8950.42 341.14 2558.99 2.92 2.15 2.05 42.79
10124.43 76.55 81.73 8958.23 345.14 2589.64 6.86 4.58 -5.27 311.66
10150.00 77.26 82.33 8964.03 348.59 2614.30 3.60 2.78 2.35 39.53
10170.00 75.49 82.01 8968.74 351.24 2633.56 9.00 -8.86 -1.61 190.00
10210.00 67.62 69.79 8981.43 360.37 2670.27 35.00 -19.68 -30.55 234.00
10462.43 90.00 341.57 9042.00 562.08 2758.00 35.00 8.87 -34.95 270.68
10620.03 90.00 322.66 9042.00 700.75 2684.62 12.00 0.00 -12.00 -90.00
11681.03 90.00 89.98 9042.00 1467.83 3064.04 12.00 0.00 12.00 90.00
.
BP-GDB
Baker Hughes INTEQ Planning Report
.
Plan Section Information
12000.03 90.00 51.70 9042.00 1570.61 3359.79 12.00 0.00 -12.00 -90.00
Survey
10060.39 74.40 82.75 8869.96 337.40 2528.19 5959779.29 667028.49 1591.33 0.00 0.00 MWD
10092.55 75.09 83.41 8878.42 341.14 2558.99 5959783.70 667059.20 1610.39 2.92 42.79 MWD
10100.00 75.43 83.02 8880.32 341.99 2566.15 5959784.70 667066.34 1614.81 6.86 311.66 MWD
10124.43 76.55 81.73 8886.23 345.14 2589.64 5959788.36 667089.75 1629.60 6.86 311.76 MWD
10150.00 77.26 82.33 8892.03 348.59 2614.30 5959792.36 667114.33 1645.27 3.60 39.53 MWD
10170.00 75.49 82.01 8896.74 351.24 2633.56 5959795.42 667133.53 1657.45 9.00 190.00 MWD
10180.00 73.45 79.05 8899.42 352.82 2643.06 5959797.22 667142.99 1663.71 35.00 234.00 MWD
10190.00 71.45 76.04 8902.43 354.88 2652.37 5959799.47 667152.25 1670.26 35.00 234.79 MWD
10200.00 69.51 72.95 8905.77 357.40 2661.45 5959802.19 667161.27 1677.10 35.00 235.70 MWD
10210.00 67.62 69.79 8909.43 360.37 2670.27 5959805.35 667170.03 1684.19 35.00 236.73 MWD
10220.00 67.70 66.00 8913.23 363.85 2678.84 5959809.02 667178.51 1691.58 35.00 270.68 MWD
10230.00 67.87 62.23 8917.01 367.89 2687.16 5959813.24 667186.75 1699.33 35.00 272.12 MWD
10240.00 68.13 58.46 8920.76 372.48 2695.22 5959818.00 667194.70 1707.41 35.00 273.55 MWD
10250.00 68.48 54.72 8924.46 377.59 2702.97 5959823.29 667202.34 1715.79 35.00 274.96 MWD
10260.00 68.91 50.99 8928.09 383.22 2710.40 5959829.07 667209.64 1724.44 35.00 276.34 MWD
10270.00 69.42 47.28 8931.65 389.33 2717.46 5959835.34 667216.57 1733.32 35.00 277.70 MWD
10280.00 70.00 43.60 8935.12 395.91 2724.14 5959842.06 667223.11 1742.40 35.00 279.02 MWD
10290.00 70.67 39.95 8938.49 402.93 2730.42 5959849.22 667229.22 1751.65 35.00 280.29 MWD
10300.00 71.40 36.33 8941.74 410.37 2736.25 5959856.78 667234.90 1761.03 35.00 281.52 MWD
10310.00 72.20 32.75 8944.86 418.19 2741.64 5959864.72 667240.11 1770.51 35.00 282.70 MWD
10320.00 73.07 29.19 8947.85 426.37 2746.55 5959873.01 667244.84 1780.05 35.00 283.82 MWD
10330.00 74.00 25.68 8950.68 434.88 2750.97 5959881.61 667249.07 1789.62 35.00 284.88 MWD
10340.00 74.98 22.19 8953.36 443.69 2754.87 5959890.50 667252.78 1799.18 35.00 285.88 MWD
10350.00 76.02 18.74 8955.86 452.76 2758.26 5959899.64 667255.97 1808.70 35.00 286.81 MWD
10360.00 77.11 15.32 8958.18 462.06 2761.10 5959909.00 667258.61 1818.14 35.00 287.67 MWD
10370.00 78.24 11.93 8960.32 471.55 2763.40 5959918.54 667260.70 1827.46 35.00 288.47 MWD
10380.00 79.41 8.56 8962.26 481.20 2765.15 5959928.23 667262.23 1836.63 35.00 289.19 MWD
10390.00 80.61 5.23 8963.99 490.98 2766.33 5959938.02 667263.20 1845.62 35.00 289.84 MWD
10400.00 81.85 1.91 8965.52 500.84 2766.94 5959947.90 667263.60 1854.39 35.00 290.42 MWD
10410.00 83.11 358.62 8966.83 510.75 2766.99 5959957.81 667263.43 1862.91 35.00 290.93 MWD
10420.00 84.40 355.35 8967.92 520.68 2766.47 5959967.72 667262.69 1871.14 35.00 291.36 MWD
10430.00 85.70 352.09 8968.78 530.58 2765.38 5959977.59 667261.38 1879.07 35.00 291.72 MWD
10440.00 87.02 348.84 8969.42 540.42 2763.72 5959987.39 667259.51 1886.65 35.00 292.00 MWD
10450.00 88.34 345.59 8969.82 550.16 2761.51 5959997.09 667257.09 1893.87 35.00 292.20 MWD
10460.00 89.68 342.36 8969.99 559.77 2758.75 5960006.63 667254.12 1900.68 35.00 292.34 MWD
10462.43 90.00 341.57 8970.00 562.08 2758.00 5960008.93 667253.31 1902.27 35.00 292.39 MWD
10475.00 90.00 340.06 8970.00 573.95 2753.87 5960020.70 667248.93 1910.32 12.00 270.00 MWD
10500.00 90.00 337.06 8970.00 597.22 2744.73 5960043.76 667239.28 1925.56 12.00 270.00 MWD
10525.00 90.00 334.06 8970.00 619.98 2734.39 5960066.29 667228.45 1939.74 12.00 270.00 MWD
10550.00 90.00 331.06 8970.00 642.16 2722.87 5960088.21 667216.45 1952.83 12.00 270.00 MWD
10575.00 90.00 328.06 8970.00 663.72 2710.21 5960109.48 667203.32 1964.78 12.00 270.00 MWD
10600.00 90.00 325.06 8970.00 684.58 2696.43 5960130.03 667189.09 1975.56 12.00 270.00 MWD
10620.03 90.00 322.66 8970.00 700.75 2684.62 5960145.95 667176.92 1983.34 12.00 270.00 MWD
10625.00 90.00 323.25 8970.00 704.72 2681.63 5960149.84 667173.85 1985.20 12.00 90.00 MWD
10650.00 90.00 326.25 8970.00 725.13 2667.20 5960169.94 667158.98 1995.27 12.00 90.00 MWD
10675.00 90.00 329.25 8970.00 746.27 2653.87 5960190.78 667145.18 2006.52 12.00 90.00 MWD
10700.00 90.00 332.25 8970.00 768.08 2641.65 5960212.32 667132.50 2018.93 12.00 90.00 MWD
10725.00 90.00 335.25 8970.00 790.50 2630.60 5960234.49 667120.95 2032.45 12.00 90.00 MWD
.
.
BP-GDB
Baker Hughes INTEQ Planning Report
Survey
10750.00 90.00 338.25 8970.00 813.47 2620.73 5960257.23 667110.59 2047.06 12.00 90.00 MWD
10775.00 90.00 341.25 8970.00 836.93 2612.08 5960280.49 667101.43 2062.71 12.00 90.00 MWD
10800.00 90.00 344.25 8970.00 860.80 2604.67 5960304.19 667093.50 2079.35 12.00 90.00 MWD
10825.00 90.00 347.25 8970.00 885.03 2598.52 5960328.28 667086.82 2096.95 12.00 90.00 MWD
10850.00 90.00 350.25 8970.00 909.54 2593.65 5960352.68 667081.41 2115.46 12.00 90.00 MWD
10875.00 90.00 353.25 8970.00 934.28 2590.06 5960377.33 667077.28 2134.82 12.00 90.00 MWD
10900.00 90.00 356.25 8970.00 959.18 2587.77 5960402.17 667074.45 2154.98 12.00 90.00 MWD
10925.00 90.00 359.25 8970.00 984.15 2586.80 5960427.12 667072.93 2175.88 12.00 90.00 MWD
10950.00 90.00 2.25 8970.00 1009.15 2587.12 5960452.11 667072.71 2197.48 12.00 90.00 MWD
10975.00 90.00 5.25 8970.00 1034.09 2588.76 5960477.08 667073.80 2219.70 12.00 90.00 MWD
11000.00 90.00 8.25 8970.00 1058.92 2591.70 5960501.96 667076.19 2242.49 12.00 90.00 MWD
11025.00 90.00 11.25 8970.00 1083.55 2595.94 5960526.68 667079.89 2265.79 12.00 90.00 MWD
11050.00 90.00 14.25 8970.00 1107.93 2601.45 5960551.18 667084.87 2289.53 12.00 90.00 MWD
11075.00 90.00 17.25 8970.00 1131.99 2608.24 5960575.38 667091.13 2313.65 12.00 90.00 MWD
11100.00 90.00 20.25 8970.00 1155.66 2616.28 5960599.22 667098.65 2338.08 12.00 90.00 MWD
11125.00 90.00 23.25 8970.00 1178.88 2625.54 5960622.63 667107.40 2362.75 12.00 90.00 MWD
11150.00 90.00 26.25 8970.00 1201.58 2636.01 5960645.55 667117.37 2387.60 12.00 90.00 MWD
11175.00 90.00 29.25 8970.00 1223.70 2647.65 5960667.92 667128.52 2412.55 12.00 90.00 MWD
11200.00 90.00 32.25 8970.00 1245.18 2660.43 5960689.68 667140.83 2437.55 12.00 90.00 MWD
11225.00 90.00 35.25 8970.00 1265.96 2674.32 5960710.76 667154.26 2462.52 12.00 90.00 MWD
11250.00 90.00 38.25 8970.00 1285.99 2689.28 5960731.11 667168.77 2487.39 12.00 90.00 MWD
11275.00 90.00 41.25 8970.00 1305.21 2705.26 5960750.67 667184.33 2512.10 12.00 90.00 MWD
11300.00 90.00 44.25 8970.00 1323.56 2722.23 5960769.39 667200.90 2536.57 12.00 90.00 MWD
11325.00 90.00 47.25 8970.00 1341.01 2740.14 5960787.22 667218.41 2560.74 12.00 90.00 MWD
11350.00 90.00 50.25 8970.00 1357.49 2758.94 5960804.10 667236.84 2584.55 12.00 90.00 MWD
11375.00 90.00 53.25 8970.00 1372.96 2778.57 5960820.00 667256.13 2607.92 12.00 90.00 MWD
11400.00 90.00 56.25 8970.00 1387.39 2798.98 5960834.87 667276.22 2630.80 12.00 90.00 MWD
11425.00 90.00 59.25 8970.00 1400.72 2820.12 5960848.66 667297.07 2653.13 12.00 90.00 MWD
11450.00 90.00 62.25 8970.00 1412.94 2841.94 5960861.35 667318.60 2674.83 12.00 90.00 MWD
11475.00 90.00 65.25 8970.00 1423.99 2864.36 5960872.89 667340.77 2695.85 12.00 90.00 MWD
11500.00 90.00 68.25 8970.00 1433.86 2887.32 5960883.26 667363.52 2716.14 12.00 90.00 MWD
11525.00 90.00 71.25 8970.00 1442.51 2910.78 5960892.42 667386.78 2735.63 12.00 90.00 MWD
11550.00 90.00 74.25 8970.00 1449.92 2934.65 5960900.35 667410.48 2754.28 12.00 90.00 MWD
11575.00 90.00 77.25 8970.00 1456.07 2958.88 5960907.03 667434.57 2772.03 12.00 90.00 MWD
11600.00 90.00 80.25 8970.00 1460.94 2983.39 5960912.44 667458.97 2788.83 12.00 90.00 MWD
11625.00 90.00 83.25 8970.00 1464.53 3008.13 5960916.57 667483.62 2804.65 12.00 90.00 MWD
11650.00 90.00 86.25 8970.00 1466.81 3033.03 5960919.39 667508.46 2819.43 12.00 90.00 MWD
11675.00 90.00 89.25 8970.00 1467.79 3058.00 5960920.92 667533.40 2833.13 12.00 90.00 MWD
11681.03 90.00 89.98 8970.00 1467.83 3064.04 5960921.09 667539.43 2836.27 12.00 90.00 MWD
11700.00 90.00 87.70 8970.00 1468.22 3083.00 5960921.89 667558.38 2846.37 12.00 270.00 MWD
11725.00 90.00 84.70 8970.00 1469.87 3107.94 5960924.09 667583.28 2860.64 12.00 270.00 MWD
11750.00 90.00 81.70 8970.00 1472.83 3132.76 5960927.59 667608.03 2875.96 12.00 270.00 MWD
11775.00 90.00 78.70 8970.00 1477.09 3157.39 5960932.39 667632.56 2892.29 12.00 270.00 MWD
11800.00 90.00 75.70 8970.00 1482.62 3181.77 5960938.46 667656.81 2909.59 12.00 270.00 MWD
11825.00 90.00 72.70 8970.00 1489.43 3205.82 5960945.79 667680.71 2927.81 12.00 270.00 MWD
11850.00 90.00 69.70 8970.00 1497.48 3229.49 5960954.36 667704.19 2946.90 12.00 270.00 MWD
11875.00 90.00 66.70 8970.00 1506.77 3252.70 5960964.14 667727.18 2966.81 12.00 270.00 MWD
11900.00 90.00 63.70 8970.00 1517.25 3275.39 5960975.12 667749.64 2987.49 12.00 270.00 MWD
11925.00 90.00 60.70 8970.00 1528.91 3297.50 5960987.26 667771.49 3008.87 12.00 270.00 MWD
11950.00 90.00 57.70 8970.00 1541.71 3318.97 5961000.52 667792.68 3030.90 12.00 270.00 MWD
11975.00 90.00 54.70 8970.00 1555.61 3339.75 5961014.88 667813.14 3053.52 12.00 270.00 MWD
12000.03 90.00 51.70 8970.00 1570.61 3359.79 5961030.31 667832.85 3076.69 12.00 270.00 MWD
Created By. Bnj Patois Date; 1/412005
PM
BP Amoco
WELf.f>ATW DfSTAn,;$
PJl:!ln·mæ C-39A
SOO2:92:na3ö1
Parel'ftWMlpatt¡: C.39
Tie e1t I'Mh '......
...' 47: :w. 7/1011993 mnoo »-
R:ef.Þewm:
v.s~ ~ ~~~ ~;:~
4n!î1e
31.00' ... ... 39..
REFERENCE !NFORMA TJON
72.0
sa:mGN øauL.$
+1<1I.$ ,.,'" ~ Wac.. v:s..w 1:m'(f!ri
All
top of
bttm of bag
middle of slips
middle of pipes
middle of flow cross
middle of blind/shears
middle of pipe/slips
are from
Nordic 1 big hole
1/4/2005
"-
CD
.~
a:
7 1/16" 5000psi
Blind/Shears
..........................
combi ram/slips
...........
,....-
Mud Cross
Mud Cross
7 1/16" 5000psi
I
I
I variable bom DÎ!)e 31/2"-2 7/8"
I
--
I"·
.......................
I
23/8" combi ram/sUps
7 1/16" 5000psi
Flow Tee
TERRIE L HUBBLE
BP EXPLORATION AK INC
PO BOX 196612 MB 7-5
ANCHORAGE, AK 99519~6612
89-6/1252 171
"Mastercard Check"
DATE () .. O:S ·D5
Anchorage,AK 99501
MEMO O,.3Qjt
~~6:RÖJF"'~~' .~~ /~ /D(); ~
;~on" "nk AI''1£& Cl'- Y(DD DDLLA~S
/fiW~ öf#dfIé
.
I: ~25 20001;OI:QQ ~I¡¡II'I; 2 2711. ~ 551;11- 0 ~7 ~
.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME Æ~
c- _?«/J
PTD# .2-o,Ç'-Oà?
Y Development
Service
CHECKWHAT
APPLŒS
ADD-ONS
(OPTIONS)
M1JLTI
LATERAL
(If API number
last two. (2) digits
are between 60-69)
Exploration
Stratigraphic
·'CLUE"·
Tbe permit is for a new wellbore segment of
existing weD' ~ .
Permit No, . API No.
Production. sbould continue to be reported as
a function' of tbe original API number. stated
above. .
H OLE In accordance witb 20 AAC 25.005(f), an
records, data and logs acquired for tbe pilot
bole must be clearly differentiated In botb
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved subject ·to fuD
compliance witb 20 AAC 25..0SS~ Approval to
perforate and produce is contingent upon
issuance of ~ conservation order approving a
spacing exception.
(Company Name) assumes tbe liability of auy
protest to the spacing .eJception tbat may
occur.
AU dry ditch sample sets submitted to tbe
Commission must be in no greater than 30'
sample intervals from below tbe permafrost
or from where samples are first caught aud
10' sample iIiter:vals through target zones.
.
e
D
D
Disposal
Well bore seg
Annular
Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT C-39A Program DEV
PTD#: 2050030 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 11-01L GeoArea ß90 Unit 11650 On/Off Shore On
Administration 1 Permit fee attache_d_ Yes
2 _Leas_e_number _apprORriate_ _ _ _ _ Yes - - - - -
3 _U_nique welt name_and o~mb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Y_es - - - - - - - - - - - - - - - - - - - - - ~ - - -
4 WellJQcated in_a_define_dppol _ _ _ Yes
'5 WellJQcat~d pr_oper _distance from driJling unitb_ound_ary Yes - - - - -
6 Well JQcat~d pmper _distance_ from Qther welJs_ _ Y_es - - - - - -
7 _S_ufficient _acreage_aYaitab1e indJilIiog unjt_ _ _Y_es - - - - -
8 Jfd~viªted. js weJlbQre plªUncJuded _ _ _ _Y_es
9 _Qperator only a((ected party _ _ Y_es
10 _Qperator has_apprppriate_ bOlld inJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes - - - - - - - - - - - - - ~ - - - - - - - - - - ~
11 Permit can be issued withQut co_nservation order _ _ _ Yes - - - - -
Appr Date 12 Permit can be iss~ed wjtbQut administratille apprpvaJ _ _ Yes - - - - -
RPC 1/5/2005 13 Can permit be approved before 15-day wait Yes
14 WellJQcated within area and_strata _authorized by Injectipo Ord_er # (put 10# in_c_omm_ents)_ (For_ _NA - - - - - -
15 _AJlweUs_withillJl4Juite_areaßfreyiewjdeotified(Fprservjc.ew_eUoolYL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA - - - - - - - - - - - - - - - - - - - - - ~ - - ~
16 PJe-prpduJ:ed injector;dur_ation_of pre-pro_ductipn less than 3 months_ (For_service well Qn)y) _ NA
17 ACMP_ finding of Consistency_has been.issued_ fpr this project _ NA - - - - - -
- -
Engineering 18 .C_ondu~tor stringpJQvided _ NA - - - - - - -
19 S_ud'ace .casing protects altkllown USDWs . NA - - - - -
20 CMT v.ot adeguate. tp circulate on .cpnd.uçtpr 8. suIt csg .NA
,21 .CMT vol adequate to tie-inJQngstring to.sur:!' csg . _ - - - - - -- NA - - - - - - - -
122 _CMT wilJ coyera)1 J<nown.productiye hQrizons . . _ . - - Y~s
23 .Casing designs ade(ua_te tor C, t, B.& permafrpst . _ _ Y_es
24 Adequate Jan.kage. OJ fe.Serve pit . _ - - - - - Yes CTDU. _
25 JtaJe-drilL has a 10-40;3 for .abandonment be.en apprQved _ . _ _ Yes *
26 Adequate.we!lbore sepªratio.n.proppse.cL . . . . . . . . . . . . . . . . . _ . . _ . . . ... Y_es - - - - - - - - ~ - - - - - - - - - . - - - -
27 Kdjverter Je~uired, dQes jtmeet reguJatipns_ . . NA Sidetrack. _
Appr Date 28 .Qrilling fJujd program schematjc& e~uipJistadequate. Yes . Max. MW.8.9 ppgc . . _ _
WGA 1/6/2005 29 B.QPEs..do.they me~t reguJatipn . _Y.es
30 .BQP.E.press ra.til'1g appropriate;.test to (put psig tn.cpmments). Yes . _ . . Testì0350Q Rsi.MSF' 2355 psi.
31 ChPkemanjfold cQmplies wlAPI BF'-53 (May 84). . Yes
32 WQrk wi!l pcc.ur withputoperation.shutdown. . _ Y.es
33 Js presence Qf H2S gas. probable. . No. _ NoLan H2S pad.
34 Me~ban¡caLcpodit[on _of wells within I\OB yerified (Fpr s_ervice welJ only). . . NA
Geology 35 Permit can be iS$~ed wlo hyd~ogen. sulfide meélS_ures. . . . .. No
36 D_ata pJeseoted on potential pveJpressuœzone,S. . NA
Appr Date I:: .Seismicanalysjs Qf shallow gas.zpoes _ NA
RPC 1/5/2005 S.eabed .condjtjpl'1 $urvey(if off-shore) . . .NA
- - - - ~
39 . CQntact nam.elphone forweelsly prpgressreports [exploratpryonlYl NA
Geologic Engineering Cß
Commissioner: Date: Commissioner: Date C . ner if"vj£"
DW //6/s
.
.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infonnation, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Dr~ing Services
LIS Scan Utility
.
$Revision: 3 $
LisLib $Revision: 4 $
Tue Jan 16 10:54:30 2007
RECEIVED
Reel Header
Service name............ .LISTPE
Date.................... .07/01/16
Orîgin. . . . . . . . . . . . . . . . . . . STS
Reel Name. . . . . . . . . . .>. . . . . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... .UNKNOWN
Comments................ .STS LIS writing Library.
JAN 2 9 Z007
,.. Oil & Gas Cons. CommIssion
Anchorage
Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .07/01/16
Origin.................. .STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library.
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
C-39A
500292238301
BP Exploration (Alaska) Inc.
Sperry Drilling Services
16-JAN-07
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 7
MW0003505869
B. JAHN
B. HOLT / B.
MWD RUN 8
MW0003505869
B. JAHN
B. HOLT / B.
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
19
IIN
14E
1835
883
MSL 0)
72.00
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
4.125 7.000 10092.0
#
80~ ... <x;>'3
d: 14~ '3
REMARKS:
.
.
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED. THESE DEPTHS
ARE BIT DEPTHS.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF
WHICH WAS AT 10092'MD/
8878'TVDSS IN THE C-39 WELLBORE. THE WHIPSTOCK WAS
POSITIONED DURING MWD
RUN 6 - NO DATA ARE PRESENTED. MWD RUN 5 WAS A FAILED
ATTEMPT TO POSITION
A WHIPSTOCK - NO DATA WERE ACQUIRED.
4. MWD RUN 7 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY
(PCG), UTILIZING
SCINTILLATION DETECTORS. UPHOLE SGRD TIE-IN DATA
ACQUIRED DURING A SHORT
TRIP WERE MERGED WITH RUN 7 MWD DATA.
5. MWD RUN 8 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (GM)
UTILIZING GEIGER-
MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4).
A MAD PASS WAS PERFORMED OVER PART OF THE RUN 7
INTERVAL WHILE RIH FOR MWD
RUN 8. THE MAD PASS EWR DATA WERE MERGED WITH RUN 8
MWD DATA. NO SEPARATE
MAD PASS PRESENTATION IS INCLUDED.
6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED
TO A CASED-HOLE GAMMA
RAY PROVIDED TO SDS BY D. DORTCH (SAIC/BP) ON
12/14/06. LOG HEADER DATA
RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES.
7. MWD RUNS 6-8 REPRESENT WELL C-39A WITH API#:
50-029-22383-01. THIS WELL
REACHED A TOTAL DEPTH (TD) OF 12102'MD/8967'TVDSS.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SGRD SMOOTHED NATURAL GAMMA RAY.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
$
File Header
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .07/01/16
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPS
RPM
FET
RPD
RPX
$
.
clipped curves;
.5000
START DEPTH
9980.5
10119.0
10305.0
10305.0
10305.0
10305.0
10305.0
.
all bit runs merged.
STOP DEPTH
12061.0
12105.0
12074.0
12074.0
12074.0
12074.0
12074.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------
BASELINE DEPTH
9980.5
9985.0
9987.0
10006.5
10011.0
10025.0
10104.0
10107.0
10109.0
10126.5
10153.5
10168.0
10179.5
10183.5
10193.5
10201.0
10219.5
10230.5
10235.5
10241.5
10246.5
10274.0
10287.0
10299.5
10313.0
10321.5
10325.0
10328.5
10333.5
10343.5
10349.0
10392.0
10414.0
10422.5
10434.0
10439.0
10443.5
10448.0
10458.0
10463.5
10472.5
10477.0
10490.0
10519.0
10527.5
10546.0
10557.5
10568.5
10578.0
GR
9976.0
9980.5
9982.0
10002.0
10006.0
10019.5
10100.0
10102.5
10104.0
10120.0
10145.5
10158.5
10174.0
10177.5
10188.0
10196.5
10215.5
10227.0
10230.5
10237.0
10241.5
10269.0
10281.0
10294.0
10307.5
10314.0
10316.0
10320.5
10329.0
10339.0
10343.5
10386.5
10408.0
10416.0
10429.0
10434.0
10442.0
10444.5
10455.0
10459.0
10467.5
10472.0
10483.5
10511.5
10521.0
10540.0
10553.5
10561.0
10570.0
10615.0
10624.0
10692.5
10704.0
10713.5
10720.5
10727.5
10729.5
10733.0
10752.5
10784.5
10800.0
10808.5
10821.5
10859.0
10880.5
10899.0
10923.0
11050.0
11195.0
11205.5
11229.5
11244.0
11274.5
11324.0
11334.5
11352.0
11369.5
11376.5
11381.0
11394.5
11403.0
11411.5
11416.0
11422.5
11430.5
11437.5
11444.5
11446.5
11451.5
11462.0
11464.0
11469.5
11476.5
11484.5
11512.0
11541.5
11573.0
11593.0
11598.5
11642.5
11704.5
11722.0
11740.0
11742.5
11761.5
11775.0
11780.5
11785.5
11792.0
11802.5
11817.5
11821.5
11922.5
11941.5
11956.0
11961.0
11972.5
10608..
10616.5
10687.5
10698.5
10707.0
10714.5
10721. 0
10722.0
10727.0
10745.5
10778 . 5
10795.0
10805.5
10818.5
10853.0
10872.0
10893.0
10916.0
11046.5
11188.0
11199.0
11224.0
11237.5
11267.5
11317.5
11329.0
11347.5
11362.5
11372.0
11376.0
11389.5
11399.0
11405.0
11409.5
11418.5
11425.5
11433.0
11439.5
11441. 5
11445.0
11456.0
11457.5
11463.0
11470.0
11479.5
11508.5
11535.5
11567.5
11587.5
11592.5
11638.0
11699.0
11 716.0
11733.5
11736.5
11756.5
11772.0
11778.5
11783.0
11790.5
11801.5
11815.5
11820.5
11920.5
11940.5
11953.0
11958.0
11968.0
.
11978.5
12105.0
$
11975.
12102.0
.
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
BIT RUN NO
7
8
MERGE TOP
9976.0
10375.0
MERGE BASE
10375.0
12102.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type...... ... .........0
Data Specification Block Type.....O
Logging Direction..... .......... ..Down
Optical log depth units.......... .Feet
Data Reference Point. ... ........ ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPD MWD OHMM 4 1 68 4 2
RPM MWD OHMM 4 1 68 8 3
RPS MWD OHMM 4 1 68 12 4
RPX MWD OHMM 4 1 68 16 5
FET MWD HOUR 4 1 68 20 6
GR MWD API 4 1 68 24 7
ROP MWD FT/H 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9980.5 12105 11042.8 4250 9980.5 12105
RPD MWD OHMM 8.35 24.34 16.3011 3539 10305 12074
RPM MWD OHMM 5.96 26.36 15.8742 3539 10305 12074
RPS MWD OHMM 5.47 26.91 15.227 3539 10305 12074
RPX MWD OHMM 4.62 26.72 14.1153 3539 10305 12074
FET MWD HOUR 0.15 7.47 0.921927 3539 10305 12074
GR MWD API 12.26 835.63 36.8418 4052 9980.5 12061
ROP MWD FT/H 0.02 1277.61 138.275 3973 10119 12105
First Reading For Entire File...... ....9980.5
Last Reading For Entire File......... ..12105
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .07/01/16
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name. ~
Version Number......... ..1.0.0
Date of Generation...... .07/01/16
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
.
header data for each bit run in separate files.
7
.5000
START DEPTH
9976.0
10113.0
STOP DEPTH
10344.5
10375.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
28-JAN-05
Insite
Memory
10375.0
10114.0
10375.0
73.3
79.5
TOOL NUMBER
TLG011
4.125
10104.0
Flo Pro
8.70
65.0
8.5
30000
7.2
.000
.000
.000
.000
.0
145.9
.0
.0
Data Format Specification ~ord
Data Record Type............. .....0
Data Specification Block Type. ....0
Logging Direction............. ... . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
Service Order
Units
FT
API
FT/H
Size
4
4
4
Nsam
1
1
1
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
GR
ROP
MWD070
MWD070
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9976 10375 10175.5 799 9976 10375
GR MWD070 API 12.26 835.63 34.6579 626 9976 10344.5
ROP MWD070 FT/H 0.02 157.08 66.6465 525 10113 10375
First Reading For Entire File......... .9976
Last Reading For Entire File.......... .10375
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... '.' .07/01/16
Maximum Physical Record. .65535
File Type............. ...LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .07/01/16
Maximum Physical Record. .65535
File Type.... ........... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
FET
RPD
RPS
RPM
GR
3
header data for each bit run in separate files.
8
.5000
START DEPTH
10299.5
10299.5
10299.5
10299.5
10299.5
10345.0
STOP DEPTH
12071. 0
12071. 0
12071.0
12071.0
12071.0
12058.0
ROP
$
10375'
12102.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point..... ........ . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value... .................. .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
30-JAN-05
Insite
4.3
Memory
12102.0
10375.0
12102.0
81.3
93.0
TOOL NUMBER
78005
171170
4.125
10104.0
Flo Pro
8.60
65.0
9.0
23000
5.6
.170
.075
.220
.180
70.0
167.7
70.0
70.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPD MWD080 OHMM 4 1 68 4 2
RPM MWD080 OHMM 4 1 68 8 3
RPS MWD080 OHMM 4 1 68 12 4
RPX MWD080 OHMM . 1 68 16 5·
FET MWD080 HOUR 4 1 68 20 6
GR MWD080 API 4 1 68 24 7
ROP MWD080 FT/H 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10299.5 12102 11200.8 3606 10299.5 12102
RPD MWD080 OHMM 8.35 24.34 16.3319 3544 10299.5 12071
RPM MWD080 OHMM 5.96 26.36 15.9033 3544 10299.5 12071
RPS MWD080 OHMM 5.47 27.11 15.2453 3544 10299.5 12071
RPX MWD080 OHMM 4.62 27.44 14.12 3544 10299.5 12071
FET MWD080 HOUR 0.15 7.47 0.919204 3544 10299.5 12071
GR MWD080 API 13.23 192.6 37.0792 3427 10345 12058
ROP MWD080 FT/H 1.6 1277.61 149.012 3454 10375.5 12102
First Reading For Entire File..... .....10299.5
Last Reading For Entire File.......... .12102
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .07/01/16
Maximum Physical Record. .65535
File Type............... .LO
Next File Name......... ..STSLIB.004
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .07/01/16
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name. . . . . . . . . . .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date.....................07/01/16
Origin.................. .STS
Reel Name............... .UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File