Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout205-005
.
.
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~.w- () 05 Well History File Identifier
Organizing (done)
o Two-sided 11111111111" 111111
o Rescan Needed 1111111111111 111111
RESCAN
~Ior Items:
u;t6reYSCale Items: \ p~
DIGITAL DATA
)Ø15iskettes, No. ~
o Other, No/Type:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Dale Lt 11,1 D 7
o Other::
BY: ~
151
'(Y\f
111111111111111111I
Project Proofing
BY: ç Maria)
Date t+ I /3. 0 7 /& mf
I X 30 = 30 + 1* = TOTAL PAGES ~'+
Dale 4-1 13 I () 7 (Counl doe, noti~~I;~I~ I~;~;I~~~; rvrP
Scanning Preparation
BY: ~
<!
Production Scanning
Stage 1 Page Count from Scanned File: L/-5 (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
BY: ~ Date:~/ 13/07
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES
NO
/,/ VV1 P
NO
BY:
Maria
Date:
Isl
11111111111I1111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
11111111111I1111111
10/6/2005 Well History File Cover Page.doc
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
January 1, 2010
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB DS 15
Dear Mr. Maunder,
bP
a~s/~°s
~f ~~ G
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS
15 that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
•
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
DS-15
Date: 01/05/10
~~~
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
15-01 B 2042570 50029206960200- NA Sealed NA
15-02B 2060720 50029206970200 NA Sealed NA
15-03 1820300 50029207220000 NA Sealed NA
15-04B 2071380 50029207260200 NA Sealed NA
15-05A 1950340 50029207310100 NA Sealed NA
15-06A 1982540 50029207420100 NA 6.7 NA 40.8 11 /7/2009
15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009
15-08C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009
15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11/11/2009
15-10A 1880850 50029205010100 NA Sealed NA
15-11 B 2041460 50029206530200 NA Sealed NA
15-126 2060870 50029206650200 NA Sealed NA
15-13A 1991240 50029206450100 NA Sealed NA
15-14A 2042220 50029206820100 NA Sealed NA
15-15C 2081820 50029206910300 NA Sealed NA
15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009
15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009
15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009
15-19A 1990990 50029218290100 NA surface NA
15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009
15-21A 1990290 50029205030100 NA Sealed NA
15-22 1800970 50029205090000 NA Sealed NA
15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009
15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009
15-25B 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009
15-266 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009
15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009
15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11/9/2009
15-29B 2090380 50029222590200 NA 0.1 NA 1.7 11 /10/2009
15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11/11/2009
15-31 B 2050860 50029222850200 NA 1.2 NA 3.4 11l11I2009
15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009
15-336 2031940 50029224480200 NA 1.6 NA 10.2 11/29/2009
15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009
15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009
15-36B 2060730 50029224800200 NA 1 NA 5.1 11/10/2009
15-37B 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009
15-38A 2030160 50029224960100 NA Sealed NA
15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11/9/2009
15-40A 1980980 50029225110100 NA 1 NA 5.1 11/9/2009
15-41B 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009
15-42B 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009
15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009
15-456 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009
15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009
15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009
15-486 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009
15-496 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009
• •
-~~~ ~.
MICROFILMED
03/01 /2008
DO NOT PLACE
a~~~~~
ANY NEW MATERIAL
UNDER THIS PAGE
F:1LaserFicheiC~+rPgs_lnserts\Microfilm Marker.~c
.
.
\VELL LOG TR~NSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
May 11, 2007
RE: MWD Formation Evaluation Logs: 15-08C L1,
AK-MW-3560124
15-08C Ll:
LAS Data & Digital Log Images:
50-029-21180-60
SCANNED MAY 172007
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETUR1~ING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, MB33
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date 41./01-
Signed:~~
Note: This data replaces any previous data for 15-08C L 1.
0/\Çno6 it- /Sí3Šo
C:t' \./ '-' -
w
>
""""""
UJ
Ü
W
D::
i""-
C::>
C::>
""-!
o
¡¡¡
.~
~
8
!d~
õ~
u~
!~
~<
a
,
~
~
~
~
3>~
DATA SUBMITTAL COMPLIANCE REPORT
4/11/2007
Permit to Drill 2050050
Well Name/No. PRUDHOE BAY UNIT 15-08CL 1
Operator BP EXPLORATION (ALASKA) INC
~ý<Ote!. ),rfi?:ùtfF
API No. 50-029-21180-60-00
MD 12317""'-- TVD 8824./ Completion Date 3/3/2005"-
Completion Status 1-01L
Cu rrent Status 1-0 I L
UIC N
-~~--.~-..----
~_.__._-~
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
_.-----------
~.-'.__._---
DATA INFORMATION
Types Electric or Other Logs Run: MWD GR / EWR, MGR / CCL
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint
Log/ Electr e'
Data Digital Dataset Log Log Run Interval OH/
Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
~-:---D -~~----,_.-
1Zt Asc Directional Survey 9983 12291 Open 3/29/2005
Directional Survey 9983 12291 Open 3/29/2005
UD/ D Asc Directional Survey 9947 12317 Open 4/27/2005 IIFR
A C j..as"" ¡..( S 14347 !.A6uc;uon/Reslstwity CI.:...<.,- 8384 c~~ LIS VERI, GR, CCL
10222 ~ 1/22/2007
~ C Lis 14573 I nd u ction/Resistivity 9972 12326 Open 4/4/2007 LIS Veri, GR, ROP
:z 14573 LIS Verification 9972 12326 Open 4/4/2007 LIS Veri, GR, ROP I
l__~.~ J
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
ADDITIONAL INFORMATION
Well Cored? Y /~
Chips Received? "T"tN-
Analysis '-t'71f
Received?
Daily History Received?
tlN
Ò/N
e
Formation Tops
Comments:
Compliance Reviewed By:
-"-"~£-v' '..
. --.-'.-
-'
Date:
¡TlJp '-i~ -;--
~~"--"_._-,-
e
-
'VELL LOG TR;\NSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West th Avenue, Suite 100
Anchorage, Alaska 99501
March 9,2007
RE: MWD Fonnation Evaluation Logs: 15-08C L1,
AK-MW-3560124
1 LDWG fonnatted CD rom with verification listing.
API#: 50-029-21180-60
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING Al~D RETlJRNING A COpy OF THE TRA1~SMITTAL
LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petrotechnical Data Center MB33
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
/Î if --
Signed:LJ<{/~
~
i
¡
_ "'ì . --- ... "'. ",.
(:y(,/.:) - OU,)
:# /¿Js-?3
1
:"
Schlull1berger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
-
é)O~--OOS
-Jt (L("3 </7-
Well Job# log Description Date Bl
MPS-10A 11076475 CH EDIT SCMT (PDC-GR) 10/17/05
15..o8CL 1 10942196 CH EDIT JEWELRY (PDC-GR) 03/01/05
Z-12 11513657 RST 12/06/06 1
l3-11 11533392 RST 12/31/06 1
AGI-10A 11485869 USIT 11/09/06
GNI-02A 11485873 USIT 11/15/06
GNI-02A 11485874 MDT 12/03/06
12-18 N/A USIT 11/17/06
NGI-07A 11212892 USIT 10/13/06
DS 12-14Al1 11540230 CORROSION & CBl 12/18/06
01-23 11549351 US IT 12/16/06
WGI-09 11486172 USIT 12/03/06
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
01/22/2007
NO. 4112
Company: State of Alaska
Alaska Oil & Gas Cons Comm
AUn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
CD
1
1
1
1
.
1
1
1
1
1
1
1
1
.
Alaska Data &
2525 Gambell S
Anchorage, AK 99503-2838
ATTN: Beth
,,) I}
F-. F_.
Received by:
. STATE OF ALASKA . RECE\VEO
ALAS~L AND GAS CONSERVATION COM ION 5
WELL COMPLETION OR RECOMPLETION REPORT AND LOG APR - 5 '2.0G
C mm\ssion
0'\ & Gas Cons. 0
(1\8s\(a \
1b. Well ClasAnÒ\úfa\\C
1m Development D Exploratory
D Stratigraphic D Service
12. Permit to Drill Number
205-005
13. API Number
50-029-21180-60-00
14. Well Name and Number:
.
No. of Completions
1a. Well Status: 1m Oil D Gas D Plugged D Abandoned D Suspended D WAG
20AAC 25.105 20AAC 25.110
CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVP HOLE
SIZE WT. PER FT. GRADE lOP BoTTOM Top BoTTOM SIZE
20" 91.5# H-40 Surface 90' Surface 90' 30"
13-3/8" 72# L-80 Surface 2539' Surface 2539' 17-1/2"
9-518" 47# L-80 Surface 7448' Surface 7189' 12-1/4"
7" 26# L-80 / 2640' 8772' 2640' 8339'[ 8-1/2"
4-1/2" 12.6# L-80 8600' 10016' 8200' 8811' 6-1/8"
2-7/8" 6.16# L-80 10029' 12170' 8812 8818 3-3/4"
23. Perforations open to Production (MD + TVD of Top and 24
Bottom Interval, Size and Number; if none, state "none"): .
2-7/8" Slotted Section
MD TVD
10036' -12138' 8812' - 8818'
D GINJ D WINJ D WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1645' SNL, 1378' EWL, SEC. 22, T11N, R14E, UM
Top of Productive Horizon:
272' NSL, 2092' EWL, SEC. 15, T11 N, R14E, UM
Total Depth:
1252' SNL, 1783' EWL, SEC. 22, T11N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- __6773g~_ y- _~59f!~.§I__ Zone- ASP4
TPI: x- 677986 y- 5961801 Zone- ASP4
Total Depth: x-- 677ÚS--- y- -5960271 Zone--ASP4
___+_____________n ____________________ ______________
18. Directional Survey 1m Yes D No
21. Logs Run:
MWD GR / EWR, MGR I CCL
22.
MD
TVD
26.
Date First Production:
March 12, 2005
Date of Test Hours Tested PRODUCTION FOR
4/1/2005 4.2 TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED +
Press. 503 900 24-HoUR RATE
One Other
5. Date Comp., Susp., or Aband.
3/3/2005
6. Date Spudded
2/25/2005
7. Date T.D. Reached
2/28/2005
8. KB Elevation (ft):
57.99'
9. Plug Back Depth (MD+ TVD)
12170 + 8818
10. Total Depth (MD+TVD)
12317 + 8824
11. Depth where SSSV set
(Nipple) 2207' MD
19. Water depth, if offshore
NI A MSL
SIZE
4-1/2", 12.6#, 13Cr80
PBU 15-08CL 1
15. Field I Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
ADL 028306
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
CSMENTINGRËCORD
370 sx Permafrost II
1938 sx PF 'E', 400 sx PF 'C'
500sx Class 'G', 300 sx PF 'C'
534 sx 'G', 274 sx 'G', 223 sx 'G'
351 sx Class 'G'
Uncemented Slotted Liner
TUBING RECORD
DEPTH SET (MD)
8602'
AMOUNT
PUllED
PACKER SET (MD)
8546'
25. ACID,FRACTURE, CEMENT .SOUEEZE,. ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10062' Set WS-R-BB packer (Whipstock Retrieved)
2500' Freeze Protect with MeOH
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
Oil -BBl
407
Oll-Bsl
2,328
GAs-McF
3,724
GAs-McF
21,279
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
27.
None ê c::: ... L::; ,
L ~;¡:;:" ò d...
'¡, ¥-Ci
¡ ,?~ ..i
Form 10-407 . RevT5ê~003
W ATER-Bsl
-0-
WATER-Bsl
-0-
LJ ¡ lJ ¡ ¡
AL
CONTINUED ON REVERSE SIDE
CHOKE SIZE I GAS-Oil RATIO
83.09 9,141
Oil GRAVITY-API (CORR)
RBDMS 8Ft APR 11 2005
aý
28.
.
GEOLOGIC MARKERS
29.
.ORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
From 15-08C:
None
Zone 1 A
9678'
8792'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed , ~. Lt. tfnJl.¡jA T'tl T h· I A . t t
Terne Hubble - I e/\/l.Ll. ~ I e ec mca SSIS an
PBU 15-08CL 1 205-005 Prepared By Name/Number:
Well Number Drilling Engineer:
Permit No. / Approval No.
Date OLl/OS/Q)"
Terrie Hubble, 564-4628
Sean McLaughlin, 564-4387
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well produèing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
.
.
15-08CL 1
Prudhoe Bay Unit
50-029-21180-60-00
205-005
Accept:
Spud:
Release:
Ri:
PRE-RIG WORK
01/14/05
DRIFTED W/3.625 CENT & S.B. TO 9366' SLM (STOPPED DUE TO DEVIATION).
01/15/05
SET 4.5 WHIDDON C-SUB, PULLED LGLV'S FROM STA # 3 & 4.
01/17/05
SET 1" DGLV'S IN STA # 4 & 3, PULL 4.5 WHIDDON C-SUB (EMPTY).
01/23/05
CONDUCT BOPE TEST. CUT 150' PIPE. MU-WOT 3.68" WS DRIFT AND PDS GRICCL TOOLS.
01/24/05
RIH WITH WOTI WS 3.68" DRIFT AND PDS GRICCL. UNABLE TO GO PAST 9383'. POOH LD INSPECT
TOOLS FOR DAMAGE, NO VISIBLE MARKS. RIH WITH 3"JSN TO 1 0200'. NO EXCESSIVE DRAG ANDIOR
PULL. CIRC WELL WI 2% KCL FROM 10150 -7800'. POH, RIH WI 3.68000 X 13' DRIFT, NO
DRAGIOVERPULL. CUT PIPE, MU NEW MHA. PU PDS MEMORY GAGES. RIH TO LOG FROM 10100' TO
8500' POH.
01/25/05
POH, VERIFY GOOD LOG DATA. MU/RIH WITH WOT WS ANCHOR PKR AND SPERRY SUN ORIENTING
TOOL. DURING TOOL MAKE UP, SETTING SLEEVE MOVED PRE-SETTING BOTTOM SLIPS ON PKR.
REMOVE PKR AND RETURN TO SHOP FOR RE-DRESSING. MU NEW WS PKR AND SPERRY ORIENT
TOOLS. RIH WITH WS PKR ASSY. NO PROBLEMS ENCOUNTERED. SET WEATHERFORD WS-R-BB PKR
AT 10056-62' SPERRY SUN ORIENTATION 307 DEG. POH FREEZE PROTECT WELL WI 40 BBLE 60/40
MEOH. FB FREEZE PROTECT FL.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-08
15-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/20/2005
Rig Release: 3/3/2005
Rig Number: 1
Spud Date: 9/16/1984
End:
2/22/2005 18:00 - 00:00 6.00 MOB P PRE Move to 15-08C
2/23/2005 00:00 - 22:30 22.50 MOB P PRE Move rig to H pad to lower derrick, continue to F Pad and raise
derrick. Continue to DS 15. Wait on PE's to kill well. Spot rig
over well.
22:30 - 00:00 1.50 MOB P PRE Grease tree. NU BOPE
RIG ACCEPT: 22:30 hrs.
2/24/2005 00:00 - 02:00 2.00 MOB P PRE NU BOP.
. Grease crew attempted to open SSV, no go.
02:00 - 10:00 8.00 BOPSUF P PRE Test BOP.
- Witnessing of test waived by Chuch Scheve AOGCC
representative.
- Test witnessed by Well Site Leader
- No tests failed.
10:00 - 10:30 0.50 BOPSUP P PRE Attempt to open SSV with valve crew.
10:30-11:15 0.75 BOPSUP P PRE Change pack off.
OFF CRITICAL PATH:
Wait on valve crew to bring appropriate fusable cap to location.
- Fusable cap gripped with only 1.5 threads. Verifying
minimum thread requirement.
- Discussed with Anchorage approval to disable SSV.
11:15-13:30 2.25 BOPSUF P PRE Bring WFD whipstock to rig floor, confirmed seals and
orientation.
Install 3 RA tags.
MU CTC and dart catcher. Pull test to 35k.
OFF CRITICAL PATH:
- Agreed to disable SSV. Performed risk assessment.
- Pump open SSV and install gauge for pressure monitoring.
13:30 - 14:30 1.00 BOPSUF P PRE Pump dart. Coil volume at 56.1 bbls.
- Pressure test CTC to 3500 psi.
14:30 - 15:00 0.50 BOPSUP P PRE Open well, on vacuum.
- Master and swab: 24 turns.
- Hole took 13 bbls to fill.
15:00 - 15:45 0.75 WHIP P WEXIT PU Whipstock.
15:45 - 17:30 1.75 WHIP P WEXIT RIH with whipstock assy.
- At 9950' MD, PU 39.5k, SO 20.7k.
- PU/SO wts show marginal change within 50' and 25'.
17:30 - 17:45 0.25 WHIP P WEXIT Set down at 10,082' MD.
Set 6k down wt.
PU to 48k SO (10k up)
Set 6k down wt.
PU and shear off at 63k (13k up)
17:45 - 19:30 1.75 WHIP P WEXIT POOH at 70 fpm.
- Called for SLB mechanic, charge pressure low on power
pack.
19:30 - 20:30 1.00 WHIP P WEXIT PU window milling assembly
20:30 - 22:00 1.50 DRILL P WEXIT RIH to 8609' tag
22:00 - 23:15 1.25 STWHIP P WEXIT Mill thru XN.
23: 15 - 00:00 0.75 STWHIP P WEXIT RIH tag at 10038 correct to 10015. Mill window
-2.5/2.55 bpm @ 1840 psi. Time milling. 38K up wt, 20 K dn
wt.
Printed: 4/1/2005 11:12:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-08
15-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/20/2005
Rig Release: 3/3/2005
Rig Number: 1
Spud Date: 9/16/1984
End:
2/25/2005 00:00 - 08:00 8.00 STWHIP P WEXIT Mill window 2.5 /2.56 bpm at 1950 psi. FS 1750 psi.
Pinch point at 10,015', window exit at 10,021' (corrected). 6'
window.
Mill 1 O' formation.
- Geo sample shows formation.
Dress window.
- Begin fluid swap to flo pro.
Dry tag.
08:00 - 08:30 0.50 STWHIP P WEXIT Swap well bore fluid to new flo pro (no reconditioned available
due to lost circulation on last well, Y-10A).
08:30 - 10:00 1.50 STWHIP P WEXIT POOH with whipstock mills.
10:00 - 11 :00 1.00 STWHIP P WEXIT Stand back injector.
Lay down mills.
- String: 3.75" nogo /3.76" go
· Pilot: 3.62" nogo / 3.63" go
Discussed with ANC. RIH to dress window.
PU rerun mills.
- String: 3.78" nogo /3.79" go
- Pilot: 3.79" nogo / 3.80" go
Check coil for wear prior to RIH.
Fusable cap installed.
11 :00 - 12:45 1.75 STWHIP P WEXIT RIH with window milling BHA #2.
- Same configuration as BHA #1
- Pumping minimum rate.
- Took weight at 8483' MD, no milling required. Likely bottom
GLM.
12:45 . 13:45 1.00 STWHIP P WEXIT Dress Window.
- Correct -21' to flag. TD at 10,031' MD.
· Saw approximately 100 psi of motor work while dressing the
window.
- Continue to dress.
· Dry tag.
13:45 - 15:30 1.75 STWHIP P WEXIT POOH with window milling BHA #2.
15:30 - 15:45 0.25 STWHIP P WEXIT Lay down mills.
- String: 3.78" nogo / 3.79" go
- Pilot: 3.79" nogo / 3.80" go
15:45 - 17:00 1.25 STWHIP P WEXIT Cut 100' of coil (chrome tubing managment)
MU coil connector
Pull test to 35k, pressure test to 3500 psi.
17:00 - 17:45 0.75 DRILL P PROD1 MU BHA #3.
17:45 - 19:30 1.75 DRILL P PROD1 RIH with build BHA #3.
19:30 - 21 :00 1.50 DRILL P PROD1 Orient 90L Directionally drill 2.6/2.62 bpm 3220 psi, 3070 psi =
FS,
21:00 - 21:15 0.25 DRILL P PROD1 Tie in co recti on + 1'. RA at 10,019 Top of WS at 10016,
Window 10016-10022.
21 :15·22:10 0.92 DRILL P PROD1 Directionally drill.
- 2.6/2.6 @ 3200 psi.
- ROP 60
22:10 - 22:25 0.25 DRILL P PROD1 Orient to 901L.
22:25 - 00:00 1.58 DRILL P PROD1 Directionally drill to 10173
2/26/2005 00:00 - 00:30 0.50 DRILL P PROD1 Directionally drilling 10,200.
-2.6/2.6 bpm @ 3300 psi. FS 3000 psi
Printed: 4/1/2005 11 :12:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-08
15-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/20/2005
Rig Release: 3/3/2005
Rig Number: 1
Spud Date: 9/16/1984
End:
2/26/2005 00:00 - 00:30 0.50 DRILL P PROD1 -37K Up wt
-19K Dn wt
. ROP70-80
00:30 - 00:45 0.25 DRILL P PROD1 Wiper to window.
00:45 - 04:15 3.50 DRILL P PROD1 Directionally drilling 10,350.
-2.6/2.6 bpm @ 3300 psi. FS 3000 psi
-37K Up wt
-19K Dn wt
- ROP70-80
04:15 - 04:40 0.42 DRILL P PROD1 Wiper to window.
04:40 - 08:00 3.33 DRILL P PROD1 Directionally drilling to 10,450'.
- 2.6/2.6 bpm @ 3300 psi. FS 3000 psi
- 37K Up wt
-19K Dnwt
- ROP20-30
08:00 - 09:30 1.50 DRILL P PROD1 POOH with build BHA.
09:30 - 10:30 1.00 DRILL P PROD1 LD probe, change motor bend to 1.0 deg.
Bit in good condition.
10:30 - 12:15 1.75 DRILL P PROD1 RIH with Lateral BHA #4
- Shallow hole test orienter and pulser.
12:15 - 12:30 0.25 DRILL P PROD1 Orient left side for window.
12:30 - 13:00 0.50 DRILL P PROD1 RIH through window.
Tie in to RA tag, -4' correction.
RIH to bottom.
13:00 - 13:15 0.25 DRILL P PROD1 Orient TF to 120L.
13:15 - 16:30 3.25 DRILL P PROD1 Directionally drill to 10,600' MD.
. 2.5/2.5 bpm @ 3200 psi. FS 2900 psi
- 35K Up wt
- 17K Dn wt
- ROP 20-100
16:30 - 17:00 0.50 DRILL P PROD1 Wiper trip to window.
17:00 - 17:15 0.25 DRILL P PROD1 Orient TF to 100L.
17:15 - 20:35 3.33 DRILL P PROD1 Directionally drill to 10,760' MD.
- 2.6/2.6 bpm @ 3400 psi. FS 3100 psi
- 33K Up wt
- 16K Dn wt
- ROP 85
20:35 - 21 :20 0.75 DRILL P PROD1 Wiper to window.
21 :20 - 23:00 1.67 DRILL P PROD1 Directionally drill to 10,900' MD.
- 2.4/2.4 bpm @ 3300 psi. FS 3000 psi
- 33K Up wt
- 16K Dn wt
- ROP 130
Mud swap.
23:00 - 00:00 1.00 DRILL P PROD1 Wiper to window
2/27/2005 00:00 - 02:00 2.00 DRILL P PROD1 Directionally drill to 11,050' MD.
- 2.5/2.6 bpm @ 3500 psi. FS 3100 psi
- 33K Up wt
- 16K Dn wt
- ROP 100
02:00 - 02:50 0.83 DRILL P PROD1 Wiper to 9300' ( 60 degree inclination). Tie in
02:50 - 03:22 0.53 DRILL P PROD1 Tie -in at RA Correction -4
03:22 - 03:30 0.13 DRILL P PROD1 Continue POH to 9300. Clean trip POH.
Printed: 4/1/2005 11:12:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-08
15-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/20/2005
Rig Release: 3/3/2005
Rig Number: 1
Spud Date: 9/16/1984
End:
2/27/2005 03:30 " 04:30 1.00 DRILL P PROD1 Complete Wiper. No problems.
04:30 - 06:00 1.50 DRILL P PROD1 Directionally drill to 11200 'MD.
" 2.5/2.6 bpm @ 3900 psi. FS 3100 psi
- 33K Up wt
" 16K Dn wt
" ROP 120
06:00 - 08:00 2.00 DRILL P PROD1 Wiper trip to window.
08:00 - 09:30 1.50 DRILL P PROD1 Directionally drill to 11,266' MD.
- 2.7/2.8 bpm @ 3700 psi. FS 3200 psi
- 34K Up wt
- 12K Dn wt
- ROP 120
09:30 - 09:45 0.25 DRILL P PROD1 Orient to 90R.
09:45 - 10:46 1.02 DRILL P PROD1 Directionally drill to 11,319' MD.
- 2.7/2.8 bpm @ 3700 psi. FS 3200 psi
- 34K Up wt
- 12K Dn wt
- ROP 120
- Sticky picking up off bottom (5-1 Ok overpull)
10:46" 12:00 1.23 DRILL P PROD1 Wiper trip to the window
- Having a hard time making hole.
12:00 - 12:30 0.50 DRILL P PROD1 Orient TF 130 R
12:30 - 14:15 1.75 DRILL P PROD1 Directionally drill 11452' MD.
"2.7/2.8 bpm @ 3700 psi. FS 3200 psi
- 34K Up wt
- 12K Dn wt
- ROP 120
14:15 - 16:00 1.75 DRILL P PROD1 Wiper trip to window.
- Overpull at 11,260' MD
Tie in to RA tag.
" +3' correction.
Wipe back to bottom.
- No hole problems on trip back in.
16:00 " 16:25 0.42 DRILL P PROD1 Orient TF to 80 R
16:25 - 17:45 1.33 DRILL P PROD1 Directionallydrill11,515' MD.
- 2.7/2.8 bpm @ 3700 psi. FS 3200 psi
" 35K Up wt
- 11 K Dn wt
- Difficulty making hole, stacking weight.
17:45 - 18:15 0.50 DRILL P PROD1 Make 500' wiper trip to clean hole.
18:15" 19:15 1.00 DRILL P PROD1 Directionally drill 11552'.
- 2.7/2.8 bpm @ 3700 psi. FS 3200 psi
- 35K Up wt
- 10K Dn wt
19:15" 20:15 1.00 DRILL P PROD1 Wiper to window. Swapping to new mud. Trouble free trip.
20:15" 22:15 2.00 DRILL P PROD1 Directionally drill to 11,700'.
"2.5/2.6 bpm @ 3700 psi. FS 3100 psi
- 35K Up wt
- 10K Dn wt
22:15 - 23:45 1.50 DRILL P PROD1 Wiper to window. Set down once at 11550 then went right thru.
Rest of trip clean.
23:45 - 00:00 0.25 DRILL P PROD1 Orient to 96L
2/28/2005 00:00 " 01 :30 1.50 DRILL P i PROD1 Directionally drill to 11,875.
Printed: 4/1/2005 11:12:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-08
15-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/20/2005
Rig Release: 3/3/2005
Rig Number: 1
Spud Date: 9/16/1984
End:
2/28/2005 00:00 - 01 :30 1.50 DRILL P PROD1 - 2.5/2.6 bpm @ 3700 psi. FS 3350 psi
- 35K Up wt
- 10K Dn wt
01 :30 - 03:00 1.50 DRILL P PROD1 Wiper to window. Set down at 11161.Pop thru. Bobble at
11550 took 3K.Pop thru.
03:00 . 04:00 1.00 DRILL P PROD1 Directionally drill to 12004'
- 2.5/2.6 bpm @ 3800 psi. FS 3350 psi
- 35K Up wt
- 10K Dn wt
- ROP 150-200
- minus 10K surface wt.
Stacking making short wipers. Lot of reactive torque
04:00 - 08:00 4.00 DRILL N STUC PROD1 Stuck @ 11980 92K full returns. Orienter functioning. Call for
crude. Circulate bottoms up.
- Attempt shutting pumps off, going to neutral weight, wait 15
min. PU. Stuck.
- Bring pumps back on line to 2.7 bpm to prevent pipe from
freezing (-21 deg F).
08:00 - 09:00 1.00 DRILL N STUC PROD1 Crude truck arrives on location.
Vapor test, ok.
Circulate 10 bbls crude down hole at 2.7/2.8 bpm 3400 psi.
Pump 2 bbls outside bit. Shut down pumps. Pipe at neutral
weight.
Attempt to pull free. Pump occassionally to expose new crude
to backside.
With 8 bbls crude out, work a couple of times. PU max wt and
hold. Pull free.
09:00 - 11 :00 2.00 DRILL P PROD1 Wiper trip to 9300' MD.
- 2.4/ 2.35 bpm, 3000 psi, 25 fpm.
- POOH slick in OH.
11 :00·12:00 1.00 DRILL P PROD1 SLB mechanic to conduct injector brake maintenance.
- Bit inside casing.
- Pumping 1 bpm, 1400 psi.
12:00 - 13:30 1.50 DRILL P PROD1 Continue wiper trip.
- Tie in to RA tag. Correct + 16 feet.
- RIH to TD, 5k stack up at 11,550' MD.
13:30 - 14:00 0.50 DRILL P PROD1 Orient TF to 100 L
14:00·16:00 2.00 DRILL P PROD1 Directionally drill to 12150' MD.
- 2.5/2.6 bpm @ 3700 psi. FS 3200 psi
- 35K Up wt
- 10K Dn wt
- ROP 150
- minus 4-10K surface wt.
- making short wiper trips as needed.
16:00 - 18:00 2.00 DRILL P PROD1 Wiper trip to window.
- POOH, 6k overpull at 11,560' MD.
. RIH, motor work at 11,560' MD
- 10K Dn wt
18:00 - 22:30 4.50 DRILL P PROD1 Directionally drill to 12315' MD.
- 2.5/2.6 bpm @ 3700 psi. FS 3200 psi
- 35K Up wt
- 10K Dn wt
Printed: 4/1/2005 11:12:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-08
15-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/20/2005
Rig Release: 3/3/2005
Rig Number: 1
Spud Date: 9/16/1984
End:
2/28/2005 18:00 - 22:30 4.50 DRILL P PROD1 - ROP 170
- minus 4-10K surface wt.
- making short wiper trips as needed.
22:30 - 00:00 1.50 DRILL P PROD1 Wiper to window.
3/1/2005 00:00 - 00:40 0.67 DRILL P PROD1 Tie-in log correction. +6'.
00:40 - 01 :30 0.83 DRILL P PROD1 Continue wiper to TD. Tag TD @ 12317'.
01 :30 - 01 :50 0.33 DRILL P PROD1 Spot liner pill and POH.
01 :50 - 02:00 0.17 DRILL N STUC PROD1 STUCK at 11998. Packed off. Can't move down or up .
Pressure backside to 350 psi. RIH broke free.
02:00 - 06:00 4.00 DRILL P PROD1 Regain full circulation. Work shale at 12000'. POH @ 2.7 bpm.
thru shale at 11500. Ratty at 11575' and 11525. Continue wiper
to 10800. RIH Set down 11538. RIH to TD no problem. POH to
9300.while waiting on pill. Ratty at 12210. Continiue to POH.
Over pull and packing off at 11510. Continue POH window.
06:00 - 06:10 0.17 DRILL P PROD1 Tie - in correction + 1.5'
06:10 - 07:00 0.83 DRILL P PROD1 Wiper trip back to TD.
- Took 10k down weight at 11,550' MD
07:00 - 08:00 1.00 DRILL P PROD1 POOH, laying in liner running pill
- Overpull (15-20k) at 12,000' MD.
- Overpull (15-20k) at 11,575 - 11,525' MD. Minimal packing
off.
08:00 - 10:00 2.00 DRILL P PROD1 POOH. Pumping at 2.5 bpm, 3200 psi, 75-100 fpm, ensuring
hole is clean.
- Flag painted at 10,035' EOP
10:00 - 11 :00 1.00 DRILL P PROD1 LD BHA.
11 :00 - 11 :20 0.33 CASE P RUNPRD Safety Meeting for running liner.
11 :20 - 14:30 3.17 CASE P RUNPRD MU and run liner as per tally.
14:30 - 16:00 1.50 CASE P RUNPRD RIH with liner 69 joints 2-7/8 STL with 5 jt inner string of 1-1/4"
CSH and memory CCL 1 GR. RIH circulating .4 bpm at 1000
psi. at 90 fpm. RIH 9900 Wt check Up Wt 44K. Dn Wt 20K.
16:00 - 16:45 0.75 CASE P RUNPRD Run in Open hole. .4 bpm at 1300 psi 70 fpm. Set dowm
11500., 11750, 11800. RIH to flag. No problem. +6 to -6 K
surface wt.
16:45 - 17:40 0.92 CASE P RUNPRD Drop 5/8" delron ball. Displace ball 1.75 bpm at 2000 psi. Ball
on seat with 49 bbl actual calculated 58.7 bbl. Shear at 2400
psi. Pu off liner
17:40 - 18:40 1.00 EVAL P LOWER1 Log up to 8400 @ 30 fpm with memory CCL 1 GR.
18:40 - 20:00 1.33 EVAL P LOWER1 POOH with CTLRT and MGR/CCL
20:00 - 21 :00 1.00 EVAL P LOWER1 LD CTLRT and 5 jts 1-1/4" CSH and SLB MCCUGR. Checked
data
TOL at 10,047ft in 50 API sand and bottom of liner at 12,189 ft
(18 ft deeper than Liner Summary Tally and 25 ft below bottom
of WS at 10022 ft). Liner fell down hole during release
operations.
21 :00 - 21 :30 0.50 EV AL P LOWER1 SLB checking on Injectorbrake head hydraulic system
21 :30 - 22:00 0.50 EV AL P LOWER1 Cut off 100 ft CT for pipe management
22:00 - 22:45 0.75 EVAL P LOWER1 Install CTC, pull tested to 40k and pressure tested to 3500 psi
22:45 - 23:00 0.25 EV AL P LOWER1 PJSM on handling WFT fishing BHA
23:00 - 23:45 0.75 EVAL P LOWER1 PU WFT Fishing BHA, repair little jerk hydraulic fitting
23:45 - 00:00 0.25 EV AL P LOWER1 RIH with Fishing BHA
3/2/2005 00:00 - 01 :45 1.75 EVAL P LOWER1 RIH with WFT Fishing BHA
WT check at 9900 ft = 32k
01 :45 - 01 :53 0.13 EVAL P LOWER1 Worked over WS at 1.0 bpm, stalled, jarred down to set box
Printed: 4/1/2005 11:12:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-08
15-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/20/2005
Rig Release: 3/3/2005
Rig Number: 1
Spud Date: 9/16/1984
End:
3/212005 01 :45 - 01 :53 0.13 EVAL P LOWER1 tap, jarring to release. Jarred 5 times starting at 10k over
working up to 30k over string wt, jarred lose, PUH dragging 10k
for 30 ft
01 :53 - 03:45 1.87 EVAL P LOWER1 PUH, closed in well, fill backside and maintaining 100-200 psi
on wellhead while POOH.
03:45 - 05:30 1.75 EVAL P LOWER1 OOH, check for flow. Stand back fishing BHA. Recovered WS
w/ spacer jt and stinger, remove pip tags. PU packer retrieving
tool
05:30 - 07:30 2.00 FISH P DECOMP RIH with packer retrieving tool
07:30 - 07:40 0.17 FISH P DECOMP Jar packer free with 8 licks. PU wt 33K Jarred 6 licks 20K over
and 2 30K over.
07:40 - 08:40 1.00 FISH P DECOMP Circulate bottoms up with FloPro. No gas on bottoms up. Swap
to KCL circulate to nozzel at 3 bpm at 3050 psi.
08:40 - 10:20 1.67 FISH P DECOMP POH. No over pulls off bottom.
10:20 - 11 :00 0.67 FISH P DECOMP LD BHA NO FISH.
11 :00 - 11 :45 0.75 FISH P DECOMP Redress packer retrieving tool.
11 :45 - 12:00 0.25 FISH P DECOMP MU Packer retrieving tool #2.
12:00 - 13:45 1.75 FISH P DECOMP RIH
13:45 - 15:30 1.75 FISH P DECOMP Up Wt 33K. Latch fish no problem. Commence jarring down
and up gradualling increasing intensity to max down and 30
over up. Without success. Pulled straight released with 75K.
Wait for packer to relax. RIH set down 10,092 ft POH but
seeing some drag over.
15:30 - 17:30 2.00 FISH P DECOMP POH. No Fish.
17:30 - 17:45 0.25 FISH P DECOMP LD fishing BHA. Pu Nozzle.
17:45 - 19:00 1.25 WHSUR P POST RIH to 2500 ft to freeze protect.
19:00 - 19:45 0.75 WHSUR P POST POOH laying in MEOH
19:45 - 20:00 0.25 WHSUR P POST OOH, close MV, PJSM on N2 blow down
20:00 - 21:15 1.25 WHSUR P POST Blow CT down with N2
21:15 - 00:00 2.75 DEMOS P POST Clean pits, pull CT to reel house, change out SOP rams to 2"
Ct
3/3/2005 00:00 - 04:15 4.25 DEMOB P POST Securing CT to reel prior to reel swap.
Using hydraulic porta-power to jack out reel pins.
Changing out Kill side check valve.
RD Tiger tank.
04:15 - 04:45 0.50 DEMOS P POST SAFETY MEETING on Reel swap with Peak, Nordic and SLB.
Midigation of hazards concerning making reel lifts
04:45 - 05:30 0.75 DEMOS P POST Finished installing kill line check valve
Conducted reel swap
05:30 - 06:00 0.50 DEMOS P POST Set injector on stands
ND SOP's and hang for mobilization
06:00 - 08:25 2.42 DEMOS P POST Make Ready to move off well
SAFETY MEETING on moving off well
08:25 - 08:30 0.08 DEMOS P POST RIG RELEASED AT 0830 hrs 3/3/2005
Printed: 4/1/2005 11:12:11 AM
.
~
~
In
~
CI)
.!!!
~ ,...
Cb~~
Q.. ~ co
..2 Q
(J)tQ~
4: ,...
t
~
:g
I::)
C\
~
a:s
2
.Q
at
~
i:i
~
~
~
~-
C\
I
~
~
q:
~
~
1::
Q
2-
ct:
~
~
a....
:::J
C/)
g
C\
-'"
'ï:::
Q"
q:
~
~
è')
m
co
g
è')
~~
CIOQ)
~r::
,.. 0
;;::- ~
. æ
~r::
~.!!!
"'Q"
I::)~.!!!
co· S
~~CI)
,.. 0 a:s
~~~
OI'-a:s
~ILI~
~""
_CI~
Q",......
q:~~
.;.: J:::: '.
~coi
5ë:~
o ,.. CI):.o.
>.1::)
a).!!!
~a:s
Q) .5;
It)~
mo
¡,¡8
.!!!~
C\1 "i:
.5; U
~
o
8
Q)
(,)
~
:;,
CI)
.
,..
,..
It)
}.
II)
~
~
~
1!
Q)
.....
a:s
~
j
~
o
i
;:::
Q)
Q)
....:
It)
è:
.S!
~
.!!!
ILl
tJ)
r::
~
~
IXI
~
~
r-, · ',In ~
L.. 'w [
Jm U ~
_0
1ft >, I., g
'I::
I" .11:."
,,:~
L «
c.:
OJJ
n.~
Ift~
BPXA
Survey Report for 15-08CL 1
Your Ref: API 500292118060
Job No. AKMW0003560124, Surveyed: 28 February, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9947.43 88.420 309.080 8751.30 8809.29 2092.89 N 507.92 E 5961973.30 N 677779.67 E -2129.19 Tie On Point
9983.12 88.240 304.930 8752.34 8810.33 2114.35 N 479.43 E 5961994.09 N 677750.69 E 11.634 -2148.09
10016.00 88.290 304.410 8753.33 8811.32 2133.05 N 452.41 E 5962012.14 N 677723.23 E 1.588 -2164.36 Window Point
10051.48 90.090 296.890 8753.84 8811.83 2151.12 N 421.91 E 5962029.49 N 677692.31 E 21.791 -2179.71
10086.11 91.490 289.550 8753.36 8811.35 2164.76 N 390.11 E 5962042.37 N 677660.20 E 21.575 -2190.53
10116.90 89.780 283.020 8753.02 8811.01 2173.39 N 360.57 E 5962050.30 N 677630.47 E 21.921 -2196.55 .
10150.07 87.980 277.350 8753.67 8811.66 2179.25 N 327.95 E 5962055.39 N 677597.71 E 17.931 -2199.54
10181.36 90.700 271 .730 8754.03 8812.02 2181.73 N 296.77 E 5962057.13 N 677566.49 E 19.951 -2199.29
10214.67 90.260 265.930 8753.75 8811.74 2181.05 N 263.48 E 5962055.67 N 677533.22 E 17.462 -2195.71
10249.54 91.580 259.070 8753.19 8811.18 2176.50 N 228.94 E 5962050.31 N 677498.80 E 20.031 -2188.17
10280.02 91 .670 252.920 8752.32 8810.31 2169.13 N 199.39 E 5962042.24 N 677469.43 E 20.171 -2178.25
10320.70 94.390 244.300 8750.17 8808.16 2154.33 N 161.60E 5962026.56 N 677432.00 E 22.189 -2160.22
10350.22 91.320 240.090 8748.70 8806.69 2140.58 N 135.53 E 5962012.20 N 677406.26 E 17.635 -2144.25
10380.93 87.010 233.760 8749.14 8807.13 2123.84 N 109.82 E 5961994.85 N 677380.95 E 24.931 -2125.33
10411.23 85.960 229.010 8751.00 8808.99 2104.97 N 86.20 E 5961975.43 N 677357.78 E 16.026 -2104.47
10444.69 91.230 224.620 8751.82 8809.81 2082.09 N 61.82 E 5961951.98 N 677333.95 E 20.493 -2079.56
10474.01 89.030 219.340 8751.76 8809.75 2060.31 N 42.22 E 5961929.74 N 677314.87 E 19.508 -2056.15
10506.28 88.680 219.170 8752.40 8810.39 2035.32 N 21.81 E 5961904.28 N 677295.05 E 1.206 -2029.48
10536.40 87.360 215.300 8753.44 8811.43 2011.36 N 3.59 E 5961879.90 N 677277.41 E 13.568 -2004.02
10569.22 86.750 209.850 8755.13 8813.12 1983.75 N 14.05 W 5961851.88 N 677260.43 E 16.688 -1974.98
10599.08 90.260 204.930 8755.91 8813.90 1957.26 N 27.77 W 5961825.07 N 677247.33 E 20.234 -1947.39
10644.37 90.970 199.130 8755.42 8813.41 1915.30N 44.75 W 5961782.72 N 677231.35 E 12.901 -1904.11
10682.18 86.570 193.680 8756.23 8814.22 1879.06 N 55.42 W 5961746.24 N 677221.53 E 18.520 -1867.08 .
10714.67 84.370 188.230 8758.80 8816.79 1847.28 N 61.58 W 5961714.32 N 677216.13 E 18.040 -1834.88
10748.82 84.460 183.310 8762.13 8820.12 1813.47 N 64.99 W 5961680.44 N 677213.51 E 14.341 -1800.91
10799.49 84.810 176.280 8766.87 8824.86 1763.05 N 64.81 W 5961630.05 N 677214.88 E 13.830 -1750.70
10828.33 87.010 172.230 8768.93 8826.92 1734.44 N 61.93 W 5961601.51 N 677218.44 E 15.949 -1722.44
10885.20 89.650 163.800 8770.59 8828.58 1678.89 N 50.13 W 5961546.25 N 677231.54 E 15.526 -1668.13
10920.86 88.940 155.710 8771.03 8829.02 1645.46 N 37.81 W 5961513.12 N 677244.65 E 22.772 -1635.91
10953.67 90.090 152.900 8771.31 8829.30 1615.90N 23.58 W 5961483.91 N 677259.57 E 9.254 -1607.70
10994.06 91.320 144.990 8770.81 8828.80 1581.33N 2.77W 5961449.84 N 677281.20 E 19.818 -1575.07
11024.45 90.970 139.360 8770.20 8828.19 1557.34 N 15.86 E 5961426.29 N 677300.38 E 18.558 -1552.80
11065.21 86.040 134.260 8771.27 8829.26 1527.65 N 43.73 E 5961397.27 N 677328.94 E 17.397 -1525.65
11112.55 85.600 126.880 8774.72 8832.71 1496.97 N 79.57 E 5961367.44 N 677365.50 E 15.576 -1498.20
11144.27 89.380 124.770 8776.11 8834.10 1478.42 N 105.25 E 5961349.50 N 677391.62 E 13.644 -1481.97
4 April, 2005 - 14:25
Page 2 of 4
DrillQuest 3.03.06.008
BPXA
Survey Report for 15-08CL 1
Your Ref: API 500292118060
Job No. AKMW0003560124, Surveyed: 28 February, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft)
11174.14 93.430 128.290 8775.38 8833.37 1460.65 N 129.24 E 5961332.31 N 677416.01 E 17.960 -1466.36
11219.00 93.430 131.800 8772.69 8830.68 1431.85 N 163.52 E 5961304.32 N 677450.96 E 7.810 -1440.65
11266.67 91.050 136.200 8770.83 8828.82 1398.77 N 197.77 E 5961272.06 N 677485.98 E 10.487 -1410.68
11297.58 92.640 140.770 8769.83 8827.82 1375.64 N 218.24 E 5961249.42 N 677506.99 E 15.646 -1389.43
11330.69 91 .490 141.470 8768.64 8826.63 1349.89 N 239.01 E 5961224.16 N 677528.37 E 4.065 -1365.58
11360.69 91.410 143.930 8767.88 8825.87 1326.03 N 257.18 E 5961200.74 N 677547.10 E 8.202 -1343.40 .
11391.02 92.370 152.370 8766.88 8824.87 1300.31 N 273.16 E 5961175.40 N 677563.68 E 27.991 -1319.17
11431.70 91.230 160.630 8765.60 8823.59 1263.05 N 289.36 E 5961138.54 N 677580.75 E 20.487 -1283.46
11468.10 91.490 160.630 8764.73 8822.72 1228.72 N 301.43 E 5961104.50 N 677593.63 E 0.714 -1250.32
11498.74 93.600 164.150 8763.37 8821.36 1199.55 N 310.69 E 5961075.56 N 677603.57 E 13.384 -1222.07
11530.50 92.460 168.010 8761.69 8819.68 1168.77 N 318.32 E 5961044.97 N 677611.92 E 12.656 -1192.07
11583.49 89.300 177. 680 8760.88 8818.87 1116.27 N 324.91 E 5960992.64 N 677619.75 E 19.194 -1140.34
11633.22 87.540 174.340 8762.25 8820.24 1066.69 N 328.36 E 5960943.15 N 677624.38 E 7.589 -1091.25
11671.68 91.230 179.090 8762.66 8820.65 1028.31 N 330.57 E 5960904.84 N 677627.48 E 15.637 -1053.21
11722.52 93.950 183.310 8760.36 8818.35 977.55 N 329.51 E 5960854.06 N 677627.62 E 9.868 -1002.55
11753.10 92.900 178.030 8758.54 8816.53 947.04 N 329.15 E 5960823.55 N 677627.98 E 17.574 -972.12
11783.70 91.580 178.030 8757.34 8815.33 916.48 N 330.20 E 5960793.03 N 677629.76 E 4.314 -941.77
11835.00 88.330 173.990 8757.38 8815.37 865.32 N 333.77 E 5960741.97 N 677634.53 E 10.106 -891.12
11877 .19 87.010 171.880 8759.10 8817.09 823.49 N 338.95 E 5960700.27 N 677640.70 E 5.896 -849.90
11907.74 87.270 167.660 8760.62 8818.61 793.47 N 344.37 E 5960670.39 N 677646.82 E 13.822 -820.47
11950.67 92.680 181.050 8760.64 8818.63 750.86 N 348.58 E 5960627.89 N 677652.04 E 33.629 -778.39
11993.34 92.640 184.360 8758.66 8816.65 708.29 N 346.57 E 5960585.28 N 677651.03 E 7.749 -735.80
12032.44 91.580 179.090 8757.22 8815.21 669.25 N 345.40 E 5960546.22 N 677650.78 E 13.739 -696.81 .
12064.72 88.420 179.090 8757.22 8815.21 636.98 N 345.91 E 5960513.97 N 677652.05 E 9.789 -664.70
12099.42 86.750 170.650 8758.68 8816.67 602.48 N 349.00 E 5960479.56 N 677655.96 E 24.772 -630.61
12134.62 89.210 169.950 8759.92 8817.91 567.81 N 354.93 E 5960445.04 N 677662.71 E 7.266 -596.58
12171.69 91.050 166.610 8759.84 8817.83 531.52 N 362.46 E 5960408.93 N 677671.09 E 10.286 -561.09
12203.12 88.420 161.510 8759.99 8817.98 501.31 N 371.09 E 5960378.94 N 677680.43 E 18.256 -531.75
12258.52 87.710 164.500 8761.86 8819.85 448.37 N 387.27 E 5960326.39 N 677697.85 E 5.544 -480.41
12291.30 84.550 162.040 8764.07 8822.06 417.05 N 396.68 E 5960295.30 N 677708.00 E 12.206 -450.04
12317.00 84.550 162.040 8766.51 8824.50 392.71 N 404.57 E 5960271 .16 N 677716.46 E 0.000 -426.48 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
4 April, 2005 - 14:25 Page 3 of 4 DrillQuest 3.03.06.008
BPXA
Survey Report fòr 15-08CL 1
Your Ref: API 500292118060
Job No. AKMW0003560124, Surveyed: 28 February, 2005
North Slope Alaska
BPXA
Vertical Section is from Well Reference and calculated along an Azimuth of 185.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12317.00ft.,
The Bottom Hole Displacement is 563.83ft., in the Direction of 45.852° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
.
9947.43
10016.00
12317.00
8809.29
8811.32
8824.50
2092.89 N
2133.05 N
392.71 N
507.92 E
452.41 E
404.57 E
Tie On Point
Window Point
Projected Survey
Survey tool program for 15-0BCL 1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
7398.00
0.00 7398.00
7158.13 12317.00
7158.13 BP High Accuracy Gyro (15-08)
8824.50 MWD Magnetic (15-08APB1)
.
4 April, 2005 - 14:25
Page 4 of 4
DrillQuest 3.03.06.008
TREE =
WELLHEAD =
ACTUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
II.1ax Angle =
Datum MD =
Datum TVD =
.
FMC GEN 3
FMC
AXELSON
57.99'
15-0f~C L 1
Proposed CTD Sidetrack
5800'
94 @ 10695'
N/A
8800' SS
113-3/8" CSG, 72#, L-80, ID = 12.347" 1-1
TOPOF 7" SCAB LNR, 26#, L-80 1-1
~
I
J
2539'
2640'
l
L
BTM OF 7" SCAB LNR, 26#, L-80 1-1 7265'
19-5/8" CSG, 47#, L-80, ID = 8.681" H 7448'
Minimum IC = 3.725" @ 8590'
4-1/2" HES XN NIPPLE
(milled to 3.8")
8
~
14-112" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958"1-1 8602'
~
I
r
ÆRFORA TION SUMMARY
REF LOG:
ANGLE AT TOP ÆRF: 88@9940'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2-1/2" 4 9940 - 9980 0 08/08/03
2-1/2" 4 1 0000 - 1 0050 0 08/08/03
2-1/2" 4 1 0070 - 1 0230 0 08/08/03
2-1/2" 4 1 0290 - 1 0400 0 08/08/03
2-1/2" 4 10510 - 10570 0 08/08/03
2-1/2" 4 10720 - 10840 0 08/08/03
2-1/2" 4 1 0900 - 11430 0 08/08/03
17" HES EZSV 1-1 8790'
17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" 1-1 9825'
I TD H 12627'
SA~ES: *** 7" CHROME LNR; 4-1/2"
cí·iRO~8G ***
FROM DRLG - DRAFT
I
~
2207' 1-14-1/2"HESXNIP,ID=3.813" I
ST MD TVD
4 3291 3291
3 5590 5590
2 7600 7292
1 8457 8073
GAS LIFT MANDRELS
DEV TYÆ VLV LATCH
o KBG-2 LGVL BK
3 KBG-2 SO BK
42 KBG-2 DMY BK
21 KBG-2 DMY BK
PORT DATE
16 03/05/05
20 03/05/05
o 08/1 0/03
o 08/1 0/03
1
I
I
8525' H4-1/2" HES X NIP, ID = 3.813" I
8546' H 7" X 4-112" BKR S-3 A<R ID = 3.875" I
8570' H4-1/2" HES X NIP, ID = 3.813" I
8590' 1-14-1/2" HES XN NIP, ID = 3.725" I
milled out to 3.S"
8600' H 7" X 4-1/2" BKR ZXP LNR TOP A<R
8602' 1-i4-1/2" WLEG, ID = 3.958" I
H ELMD TT NOT LOGGED I
I MILLOUT WINDOW 8772' - 8780'
10029'-iTOP of 2-7/8" liner
/ 10047' -1fromMCCLlGR
/ I Drilled 3-3/4" Hole to 12317 ft 1
t::'- 000000
2-7/8" L-80 Pre-drilled Liner I 12170'
Liner landed f/ MCCL/GR 12189'
TIW WS-R-BB Ret Packer
10,065 ft 10=2.063"
~ 14-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 1-1 11551'
DATE
1984
10/21/93
11/22/97
08/11/03
08/15/03
02/04/04
REV BY COMMENTS
ORIGINAL COM PLETION
SIDETRACK (1S-0SA)
SIDETRACK (1S-08B)
JDM/KK RIG SIDETRACK (1S-08C)
RWL/KK GL V C/O
CMOITLP ÆRF ANGLE CORRECTION
DATE REV BY COMMENTS
03/03/0S DLHlBL CTD Sidetrack (1S-08CL 1)
03/06/05 MGS/TLH GL V C/O
PRUDHOE BA Y UNIT
WELL: 15-08C
ÆRMIT No: 2031210
API No: 50-029-21180-03
SEC 22, T11 N, R14E, 4050.67' FEL & 3719.98' FNL
BP Exploration (Alaska)
.
.
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well 15-08C L 1
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
9,947.43' MD
10,016.00' MD
12,317.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Signed JL¡ rtL~
Date ;( 7 f1pJJrtJr
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
23-Apr-05
}¡ cJ Y-- -do> ~-
~
'ObP
· Baker Hughes INTEQ .
Baker Hughes INTEQ Survey Report
.¡¡.
BAKU
HUGHH
LNTEQ
Company:
Field:
Site:
Well:
Wellpath:
BP·Amoco
Prudhoe Bay
PB DS 15
15-08
15-08CL1
Date: 3/23/2005 Time: 10:30:16 Page:
Co-ordinate(NE) Reterence: Well: 15-08, True North
Vertical (TVD) Reference: 57.99' .58.0
Section (VS)Reference: Well (0.QON,0.ooE,185.00Azi)
Snrvey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5958837.36 ft
676296.98 ft
Latitude: 70 17
Longitude: 148 34
North Reference:
Grid Convergence:
35.236 N
21.213 W
True
1.34 deg
15-08
15-08
Well Position:
Slot Name:
Well:
+N/-S 1007.41 ft
+E/-W 1048.27 ft
Position Uncertainty: 0.00 ft
Northing:
~;asting :
5959869.01 ft
677321.27 ft
Latitude:
Longitude:
70 17 45.144 N
148 33 50.659 W
+N/-S
ft
0.00
Dritled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angte:
+E/-W
ft
0.00
15-08C
10016.00 ft
Mean Sea Level
24.99 deg
80.86 deg
Direction
deg
185.00
Wellpath: 15-08CL 1
500292118060
Current Datum: 57.99'
Magnetic Data: 1/6/2005
Field Strength: 57632 nT
Vertical Section: Depth From (TVD)
ft
26.99
Height 57.99 ft
Survey Program for Definitive Well path
Date: 3/4/2005 Validated: Yes
Actual From To Survey
ft ft
28.99 7386.99
7455.06 8761.90
8772.00 9983.12
10016.00 12291.30
Version:
Toolcode
3
Tool Name
Sperry-Sun BOSS gyro multi (28.99-9386.9!1)<¡x.'I}S-GYRO
MWD (7455.06-9805.06) (1) MWD
MWD (8772.00-11501.88) (S) MWD
MWD (10016.00-12291.30) MWD
Sperry-Sun BOSS gyro multishot
MWD - Standard
MWD - Standard
MWD - Standard
Annotation
MD
ft
9947.43
10016.00
10051.48
10086.11
12317.00
TVD
ft
8808.24
8810.27
8810.78
8810.30
0.00
TIP
KOP
Interpolated Azimuth
Interpolated Azimuth
Projected TD
Survey: MWD
Start Date:
2/25/2005
Company: Halliburton
Tool: MWD;MWD - Standard
Engineer:
Tied-to:
BakerHugheslNTEQ
From: Definitive Path
)0 )-- a ())
"'ObP · Baker Hughes INTEQ . -¡¡.
BAKm
HUGIIIS
Baker Hughes INTEQ Survey Report INTEQ
Company: BP Amoco Date: .3/23/2005 Time: 10:30:16 Page: 2
Field: Prudhoe Bay Co-ôrdinate(NE) Reference: Well: 15-08, True North
Site: PB DS 15 Vertical (TVD) Refertjnce: 57.99' 58.0
Well: 15'()8 section (VS) Reference: Well (0.00N,O.00E,185,OOAzi)
Wellpath: 15-08CL 1 Survey Caltulation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deQ/10Oft
9983.12 88.24 304.93 8809.28 8751.29 2114.99 480.42 5961994.61 677751.63 -2148.82 0.00 MWD
10016.00 88.29 304.41 8810.27 8752.28 2133.69 453.40 5962012.66 677724.17 -2165.09 1.59 MWD
10051.48 90.09 296.89 8810.78 8752.79 2151.76 422.90 5962030.01 677693.26 -2180.43 21.79 MWD
10086.11 91.49 289.55 8810.30 8752.31 2165.40 391.10 5962042.90 677661.15 -2191.25 21.58 MWD
10116.90 89.78 283.02 8809.96 8751.97 2174.03 361.56 5962050.83 677631.42 -2197.27 21.92 MWD
10150.07 87.98 277.35 8810.60 8752.61 2179.89 328.94 5962055.92 677598.67 -2200.27 17.93 MWD
10181.36 90.70 271.73 8810.97 8752.98 2182.37 297.76 5962057.65 677567.44 -2200.01 19.95 MWD
10214.67 90.26 265.93 8810.69 8752.70 2181.69 264.47 5962056.19 677534.18 -2196.44 17 .46 MWD
10249.54 91.58 259.07 8810.13 8752.14 2177.14 229.93 5962050.83 677499.76 -2188.90 20.03 MWD
10280.02 91.67 252.92 8809.26 8751.27 2169.77 200.38 5962042.76 677470.39 -2178.98 20.17 MWD
10320.70 94.39 244.30 8807.11 8749.12 2154.97 162.59 5962027.08 677432.97 -2160.94 22.19 MWD
10350.22 91.32 240.09 8805.64 8747.65 2141.22 136.52 5962012.72 677407.23 -2144.97 17.63 MWD
10380.93 87.01 233.76 8806.08 8748.09 2124.48 110.81 5961995.38 677381.92 -2126.05 24.93 MWD
10411.23 85.96 229.01 8807.94 8749.95 2105.61 87.19 5961975.96 677358.75 -2105.20 16.03 MWD
10444.69 91.23 224.62 8808.76 8750.77 2082.73 62.81 5961952.51 677334.93 -2080.28 20.49 MWD
10474.01 89.03 219.34 8808.70 8750.71 2060.95 43.21 5961930.27 677315.85 -2056.87 19.51 MWD
10506.28 88.68 219.17 8809.34 8751.35 2035.96 22.80 5961904.81 677296.03 -2030.20 1.21 MWD
10536.40 87.36 215.30 8810.38 8752.39 2012.00 4.58 5961880.43 677278.39 -2004.75 13.57 MWD
10569.22 86.75 209.85 8812.07 8754.08 1984.39 -13.06 5961852.41 677261.40 -1975.70 16.69 MWD
10599.08 90.26 204.93 8812.85 8754.86 1957.90 -26.78 5961825.61 677248.31 -1948.12 20.23 MWD
10644.37 90.97 199.13 8812.36 8754.37 1915.94 -43.76 5961783.26 677232.32 -1904.83 12.90 MWD
10682.18 86.57 193.68 8813.17 8755.18 1879.70 -54.43 5961746.78 677222.51 -1867.80 18.52 MWD
10714.67 84.37 188.23 8815.74 8757.75 1847.92 -60.59 5961714.86 677217.11 -1835.60 18.04 MWD
10748.82 84.46 183.31 8819.07 8761.08 1814.11 -64.00 5961680.99 677214.49 -1801.63 14.34 MWD
10799.49 84.81 176.28 8823.81 8765.82 1763.69 -63.82 5961630.59 677215.86 -1751.42 13.83 MWD
10828.33 87.01 172.23 8825.87 8767.88 1735.08 -60.94 5961602.06 677219.42 -1723.17 15.95 MWD
10885.20 89.65 163.80 8827.53 8769.54 1679.53 -49.15 5961546.80 677232.52 -1668.86 15.53 MWD
10920.86 88.94 155.71 8827.97 8769.98 1646.10 -36.82 5961513.68 677245.63 -1636.63 22.77 MWD
10953.67 90.09 152.90 8828.25 8770.26 1616.54 -22.59 5961484.47 677260.55 -1608.42 9.25 MWD
10994.06 91.32 144.99 8827.75 8769.76 1581.97 -1.78 5961450.40 677282.17 -1575.80 19.82 MWD
11024.45 90.97 139.36 8827.14 8769.15 1557.98 16.85 5961426.86 677301.36 -1553.52 18.56 MWD
11065.21 86.04 134.26 8828.20 8770.21 1528.29 44.72 5961397.83 677329.92 -1526.37 17 .40 MWD
11112.55 85.60 126.88 8831.66 8773.67 1497.61 80.56 5961368.00 677366.47 -1498.93 15.58 MWD
11144.27 89.38 124.77 8833.05 8775.06 1479.06 106.24 5961350.07 677392.58 -1482.69 13.64 MWD
11174.14 93.43 128.29 8832.32 8774.33 1461.29 130.23 5961332.88 677416.98 -1467.08 17.96 MWD
11219.00 93.43 131.80 8829.63 8771.64 1432.49 164.51 5961304.89 677451.93 -1441.38 7.81 MWD
11266.67 91.05 136.20 8827.77 8769.78 1399.41 198.76 5961272.63 677486.95 -1411.41 10.49 MWD
11297.58 92.64 140.77 8826.77 8768.78 1376.28 219.23 5961249.99 677507.96 -1390.15 15.65 MWD
11330.69 91.49 141.47 8825.58 8767.59 1350.53 240.00 5961224.74 677529.33 -1366.30 4.07 MWD
11360.69 91.41 143.93 8824.82 8766.83 1326.67 258.17 5961201.32 677548.05 -1344.12 8.20 MWD
11391.02 92.37 152.37 8823.82 8765.83 1300.95 274.15 5961175.98 677564.64 -1319.89 27.99 MWD
11431.70 91.23 160.63 8822.54 8764.55 1263.69 290.35 5961139.12 677581.71 -1284.19 20.49 MWD
11468.10 91.49 160.63 8821.67 8763.68 1229.36 302.42 5961105.08 677594.58 -1251.04 0.71 MWD
11498.74 93.60 164.15 8820.31 8762.32 1200.19 311.68 5961076.14 677604.53 -1222.79 13.38 MWD
11530.50 92.46 168.01 8818.63 8760.64 1169.41 319.31 5961045.56 677612.88 -1192.79 12.66 MWD
11583.49 89.30 177.68 8817.82 8759.83 1116.91 325.90 5960993.23 677620.71 -1141.07 19.19 MWD
11633.22 87.54 174.34 8819.19 8761.20 1067.33 329.35 5960943.74 677625.33 -1091.97 7.59 MWD
11671.68 91.23 179.09 8819.60 8761.61 1028.95 331.56 5960905.43 677628.44 -1053.93 15.64 MWD
11722.52 93.95 183.31 8817.30 8759.31 978.19 330.50 5960854.66 677628.57 -1003.27 9.87 MWD
11753.10 92.90 178.03 8815.48 8757.49 947.68 330.14 5960824.15 677628.94 -972.85 17.57 MWD
11783.70 91.58 178.03 8814.28 8756.29 917.12 331.19 5960793.63 677630.71 -942.50 4.31 MWD
11835.00 88.33 173.99 8814.32 8756.33 865.96 334.76 5960742.58 677635.48 -891.85 10.11 MWD
11877.19 87.01 171.88 8816.04 8758.05 824.13 339.94 5960700.88 677641.65 -850.62 5.90 MWD
. . Bia.
.. "ObP Baker Hughes INTEQ IIAJCD
HUGHIS
Baker Hughes INTEQ Survey Report INTEQ
Company: BP Amoco Date: 3/23/2005 Time: 10:30:16 Page: 3
Field: prudhoe Bay Co-ordinate(NE)Reference: Well: 15-08, True North
Site: PB DS 15 Vertical (TVD)Reference: 57.99' 58.0
Well: 15-08 Section (VS)Reference: Well (0.00N,0.00E,185.00Azi)
Wellpath: 15-08CL1 Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Inel Azim TVD SSTVD N/S E/W MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/10Oft
11907.74 87.27 167.66 8817.56 8759.57 794.11 345.36 5960671.00 677647.78 -821.19 13.82 MWD
11950.67 92.68 181.05 8817.58 8759.59 751.50 349.57 5960628.50 677652.99 -779.11 33.63 MWD
11993.34 92.64 184.36 8815.60 8757.61 708.93 347.56 5960585.90 677651.99 -736.53 7.75 MWD
12032.44 91.58 179.09 8814.16 8756.17 669.89 346.39 5960546.84 677651.73 -697.53 13.74 MWD
12064.72 88.42 179.09 8814.16 8756.17 637.62 346.90 5960514.60 677653.01 -665.43 9.79 MWD
12099.42 86.75 170.65 8815.62 8757.63 603.12 349.99 5960480.18 677656.92 -631.33 24.77 MWD
12134.62 89.21 169.95 8816.86 8758.87 568.45 355.92 5960445.66 677663.66 -597.31 7.27 MWD
12171.69 91.05 166.61 8816.78 8758.79 532.16 363.45 5960409.56 677672.04 -561.81 10.29 MWD
12203.12 88.42 161.51 8816.92 8758.93 501.95 372.08 5960379.57 677681.38 -532.47 18.26 MWD
12258.52 87.71 164.51 8818.80 8760.81 449.01 388.25 5960327.02 677698.80 -481.14 5.56 MWD
12291.30 84.55 162.04 8821.01 8763.02 417.69 397.66 5960295.94 677708.94 -450.76 12.22 MWD
".
~~!Æ:E (ill} !Æ~!Æ~~«!Æ
.
AI',ASIiA OIL AlQ) GAS
CONSERVATION COltDllSSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7T" AVENUE, SUITE 1 00
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Sean McLaughlin
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay 15-08CLl
BP Exploration (Alaska) Inc.
Permit No: 205-005
Surface Location: 1645' SNL, 1378' EWL, SEe. 22, TIIN, RI4E, UM
Bottomhole Location: 1009' SNL, 1721' EWL, SEC. 22, TUN, R14E, UM
Dear Mr. McLaughlin:
Enclosed is the approved application for permit to redrill the above development well.
The permit is for a new well bore segment of existing well PBU 15-08C, Permit No. 203-121,
API No. 50-029-21180-03. Production should continue to be reported as a function of the
original API number stated above.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to . ~ess any required test. Contact the
Commission's petroleum field inspector at (907 659- 07 (pager).
DATED this~day of January, 2005
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environrnental Conservation w/o encl.
W G Å; i ( I z. / 2. 00<.;
o Drill II Redrill
1 a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1645' SNL, 1378' EWL, SEC. 22, T11N, R14E, UM
Top of Productive Horizon:
272' NSL, 2092' EWL, SEC. 15, T11N, R14E, UM
Total Depth:
1009' SNL, 1721' EWL, SEC. 22, T11N, R14E, UM
. STATE OF ALASKA .
ALASKA~L AND GAS CONSERVATION CO"ISSION
PERMIT TO DRILL
20 AAC 25.005 Oil & (;;1>: Conô C .. \' .
11 b. Current Well Class 0 Exploratory II Development Oil ~!!iple Žongmn,~wr'
o Stratigraphic Test 0 Service 0 Development Gas r!J1S1IìIW_þne
5. Bond: 181 Blanket 0 Single Well 11. Well Name and Number:
Bond No. 2S100302630-277 PBU 15-08CL 1
6. Proposed Depth: 12. Field I Pool(s):
MD 12000 TVD 8776ss Prudhoe Bay Field I Prudhoe Bay
7. Property Designation: Pool
ADL 028306
JAN 1 0 2005
8. Land Use Permit:
13. Approximate Spud Date:
February 8, 2005
14. Distance to Nearest Property:
28,000'
9. Acres in Property:
2560
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 677321 y- 5959869 Zone- ASP4
16. Deviated Wells: Kickoff Depth: 10000 feet
Maximum Hole Angle: 90 degrees
18. Casing Program:
Size
Casing
2-7/8"
Hole
3-3/4"
Weight
6.16#
Specifications
Grade Coupling Length
L-80 STL 1990'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 57.99' feet 1,000'
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3300 Surface: 2420
Setting Dfilpth
Top Bottom
MD TVD MD TVD (including stage data)
10010' 8753' 12000' 8776 Uncemented Slotted Liner r
19: PRESENT WELL CONDITION SUMMARY (To be completed for RednIlANDRe-.entryOPerØti(>)s)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Effective Depth TVD
11552 8782 None 11506 8782
Structural
Conductor 90' 20" 370 sx Permafrost II 90' 90'
Surface 2539' 13-3/8" 1938 sx PF 'E', 400 sx PF 'C' 2539' 2539'
Intermediate 7448' 9-5/8" 500 sx Class 'G', 300 sx PF 'C' 7448' 7189'
Production
Liner 6132' 7" 534 sx Class 'G', 274 sx 'G', 223 sx 'G' 2640' - 8772' 2640' - 8339'
Liner 2951' 4-1/2" 351 sx Class 'G' 8600' - 11551' 8200' - 8782'
20. Attachments 181 Filing Fee, $100 181 BOP Sketch
o Property Plat 0 Diverter Sketch
perfOration Depth TVD (ft): 8809' - 8782'
181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report 181 Drilling Fluid Program 181 20 AAC 25.050 Requirements
Perforation Depth MD (ft): 9940' - 11430'
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Sean McLaughlin Title CT Drilling Engineer
Signature ç'\.../ CLI'--:- Phone 564-4387
Date:
Contact Sean McLaughlin, 564-4387
Prepared By Name/Number:
Terrie Hubble, 564-4628
Permit To Drill API Number:
Number: .zo6" - 0 cJ S 50- 029-21180-60-00
Conditions of Approval: Samples Re uired 0 Yes ~No
Hydrog Sui de Measures .%Yes 0 No
o e E 00 r~'~ .
Permit Approy~ ¡: ___
Date: ;¡ /.3 tJ S
Mud Log Required
Directional Survey Required
See cover letter for
other requirements
o Yes ~NO
)ªYes 0 No
,
APPROVED BY
THE COMMISSION
Date 1L!Lo£e
~
.
BP
15-08CLl Sidetrack
.
CTD Sidetrack Summary
1) Mill window off whipstock
2) Drill sidetrack
3) Run slotted liner
Mud Program:
· Well kill: 8.4 - 8.9 pp~e
· Milling/drilling: 8.5 ~pg used Flo Pro or biozan for milling, new PIo Pro for drilling.
Disposal:
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: /
· 27/8" pre-drilled liner completion 10,010' - 12,000'
· No liner cement planned.
Casin2lLiner Information
13 3/8", L-80, 72#, Burst 5380 psi; collapse 2670 psi
95/8", L-80 47#, Burst 6870, collapse 4750
7", L-80, 26#, Burst 7240 psi; collapse 5410 psi
4 Y2" L-80, 12.6#, Burst 8430 psi; collapse 7500 psi
planned /
27/8" L-80 STL 6.16#, slotted liner (hole size 3.75")
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. r-
· The annular pre venter will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 90deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
· Distance to nearest property is 28000 ft.
· Distance to nearest well within pool -1000 ft.
Logging
· MWD directional and Gamma Ray will be run over all of the open hole section.
Hazards
· DS] 5 pad is not designated as an H2S pad.
--
Reservoir Pressure
· Res. press. is estimated to be 3300 psi at 8800'ss (7.3 ppg EMW).
Max. surface pressure with gas (0.10 psi/ft) to surface is 2420 psi. /'
TREE =
WELLHEAD =
. .- . .
ACTUATOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum1VD=
FMC GEN 3
FMC
AXELSON
57.99'
.
5800'
94 @ 10695'
N/A
8800' SS
113-3/8" CSG, 72#, L-80, ID = 12.347" H 2539'
ITOPOF 7" SCAB LNR, 26#, L-80 H 2640'
1 BTM OF 7" SCAB LNR, 26#, L-80 H 7265' I
19-5/8" CSG, 47#, L-80, ID = 8.681" H 7448' ~
Minimum ID = 3.725" @ 8590'
4-1/2" HES XN NIPPLE
14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958"H 8602'
ÆRFORA TION SUMMARY
REF LOG:
ANGLE AT TOP ÆRF: 88 @ 9940'
Note: Refer to Production OB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 4 9940 - 9980 0 08/08/03
2-1/2" 4 1 0000 - 1 0050 0 08/08/03
2-1/2" 4 10070 - 10230 0 08/08/03
2-1/2" 4 10290 - 10400 0 08/08/03
2-1/2" 4 10510 - 10570 0 08/08/03
2-1/2" 4 10720 - 10840 0 08/08/03
2-1/2" 4 10900 - 11430 0 08/08/03
17" HES EZSV H 8790'
17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" H 9825'
1 TO H 12627'
DATE
1984
10/21/93
11/22/97
08/11/03
08/15/03
02/04/04
REV BY COMMENTS
ORIGINAL COM PLETION
SIDETRACK (15-08A)
SIDETRACK (15-08B)
JDM/KK RIG SIDETRACK (15-08C)
RWL/KK GL V C/O
CMO/TLP ÆRF ANGLE CORRECTION
DATE
15-08C
~
I
~
REV BY
l
J
l
8
I
~ I
I
r
~
I
~ NOTES: *** 7" CHROME LNR; 4-112"
CHROME TBG ***
I
~
2207' H 4-1/2" HES X NIP, 10 = 3.813" I
ST MO 1VD
4 3291 3291
3 5590 5590
2 7600 7292
1 8457 8073
GAS LIFT MANDRELS
DEV TYÆ VLV LATCH
o KBG-2 DOME BK
3 KBG-2 SO BK
42 KBG-2 DMY BK
21 KBG-2 DMY BK
PORT OA TE
16 08/15/03
20 08/15/03
o 08/10/03
o 08/10/03
8525'
H4-1/2"HESXNIP,ID=3.813" I
H 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" I
H4-1/2" HES X NIP, ID = 3.813" I
H 4-1/2" HES XN NIP, ID = 3.725" I
H 7" X 4~ 1 /2" BKR ZXP LNR TOP PKR
H 4-1/2" WLEG, 10 = 3.958" I
H ELMO TT NOT LOGGED I
8546'
8570'
8590'
8600'
8602'
I MILLOUT WINDOW 8772' - 8780'
14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" H 11551' I
COMMENTS
PRUDHOE BA Y UNIT
WELL: 15-08C
ÆRMIT No: 2031210
API No: 50-029-21180-03
SEC22, T11N, R14E, 4050.67' FEL & 3719.98' FNL
BP Exploration (Alaska)
TREE =
WELLHEAD =
ACTUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum TVD =
.
15-08C L 1--;aNOTES: ***7"CHROMELNR;4-112"
CHROME TBG ***
Proposed CTD Sidetrack
FMC GEN 3
FMC
AXELSON
57.99'
5800'
94 @ 10695'
NIA
. ..... . .
8800' SS
113-3/8" CSG, 72#, L-80, ID = 12.347" H 2539'
1 TOP OF 7" SCAB LNR, 26#, L-80 H 2640'
I BTM OF 7" SCAB LNR, 26#, L-80 H 7265'
19-5/8" CSG, 47#, L-80, ID = 8.681" H 7448'
Minimum ID = 3.725" @ 8590'
4-1/2" HES XN NIPPLE
(milled to 3.8")
14-1/2" TBG, 12.6#, 13-CR. .0152 bpf, ID = 3.958"H 8602'
PERFORA TION SUMMARY
REF LOG:
ANGLE AT TOP PERF: 88 @ 9940'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 4 9940 - 9980 0 08/08/03
2-1/2" 4 10000 - 10050 0 08/08/03
2-1/2" 4 10070 - 10230 0 08/08/03
2-1/2" 4 10290 - 10400 0 08/08/03
2-1/2" 4 10510 - 10570 0 08/08/03
2-1/2" 4 10720 - 10840 0 08/08/03
2-1/2" 4 10900-11430 0 08/08/03
17" HES EZSV - 8790'
17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" H 9825'
I TO H 12627'
DATE REV BY COMMENTS
1984 ORIGINAL COMPLETION
10/21/93 SIDETRACK (15-08A)
11/22/97 SIDETRACK (15-08B)
08/11/03 JDM/KK RlGSIDETRACK{15-08C)
08/15/03 RWUKK GL V C/O
02/04/04 CMOITLP PERF ANGLE CORRECTION
.
.
~
I
l
J
L
g
I
~ I
I
I
r--¡
1
~
1
~
220T H4-1/2" HES X NIP, ID = 3.813" I
GAS LIFT MANDRELS
ST MD TVD DEV TYÆ VLV LATCH
4 3291 3291 0 KBG-2 DOME BK
3 5590 5590 3 KBG-2 SO BK
2 7600 7292 42 KBG-2 DMY BK
1 8457 8073 21 KBG-2 DMY BK
roRT DATE
16 08/15/03
20 08/15/03
o 08/10/03
o 08/10/03
8525' H4-1/2" HES X NIP, ID = 3.813"
8546' H7" X 4-1/2" BKRS-3 A<R,ID= 3.875" I
8570' -4-1/2"HESXNIP,ID=3.813" I
8590' H4-1/2" HES XN NIP, ID = 3.725"
8600' H 7" X 4-1/2" BKR ZXP LNR TOP A<R
8602' -4-1/2" WLEG, ID = 3.958" I
H ELMD TT NOT LOGGED
I MIL LOUT WINDOW 8772' - 8780'
10000' 1-1 Retrievable :-VhipstoCk &
I Packer (retneved)
~ 10010' HTop of 2-7/8" liner
3-3/4" Open Hole
000000 I
12-7/8" L-80 Pre-drilled Liner H 12000'
~ 14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" H 11551'
DA TE REV BY
COMMENTS
PRUDHOE BA Y UNIT
WELL: 15-08C
PERMIT No: 2031210
API No: 50-029-21180-03
SEC 22, T11N, R14E, 4050.67' FEL & 3719.98' FNL
BP Exploration (Alaska)
Obp
. .
Baker Hughes Incorporated
INTEQ Planning Report
.,a:
INTEQ
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5958837.36 ft
676296.98 ft
Latitude: 70 17
Longitude: 148 34
North Reference:
Grid Convergence:
35.236 N
21.213 W
True
1.34 deg
Well: 15-08 Slot Name:
15-08
Well Position: +N/-S 1007.41 ft Northing: 5959869.01 ft Latitude:
+E/-W 1048.27 ft Easting: 677321.27 ft Longitude:
Position Uncertainty: 0.00 ft
70 17 45.144 N
148 33 50.659 W
Wellpath: Plan #6 15-08CL 1
500292118060
Current Datum: 57.99'
Magnetic Data: 1/6/2005
Field Strength: 57632 nT
Vertical Section: Depth From (TVD)
ft
26.99
Plan: Plan #6
Lamar's Plan
Principal: Yes
Date Composed:
Version:
Tied-to:
15-08C
9947.43 ft
Mean Sea Level
24.99 deg
80.86 deg
Direction
deg
185.00
1/6/2005
4
From: Definitive Path
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Height 57.99 ft
Targets
15-08CL 1 Polygon 57.99 2459.34 20.76 5962328.00 677284.00 70 18 9.331 N 148 33 50.054 W
-Polygon 1 57.99 2459.34 20.76 5962328.00 677284.00 70 18 9.331 N 148 33 50.054 W
-Polygon 2 57.99 2099.67 510.44 5961980.00 677782.00 70 18 5.793 N 148 33 35.777 W
-Polygon 3 57.99 1646.21 99.60 5961517.00 677382.00 70 18 1.334 N 148 33 47.756 W
-Polygon 4 57.99 646.79 484.16 5960527.00 677790.00 70 1751.505 N 148 33 36.546 W
-Polygon 5 57.99 549.58 279.79 5960425.00 677588.00 70 17 50.549 N 148 33 42.504 W
-Polygon 6 57.99 1642.56 -127.56 5961508.00 677155.00 70 18 1.298 N 148 33 54.378 W
15-08CL 1 T1 8820.99 1644.56 -42.49 5961512.00 677240.00 70 18 1.318 N 148 33 51.898 W
15-08CL1 T2 8833.99 661.21 339.45 5960538.00 677645.00 70 1751.646N 148 33 40.765 W
Annotation
9947.43
10000.00
10020.00
10060.00
10410.00
10900.00
11100.00
11400.00
11700.00
12000.00
8808.24
8809.79
8810.17
8810.49
8812.62
8817.74
8820.91
8825.09
8828.48
8834.40
TIP
KOP
3
4
end of 20°/100' DLS
5
6
7
8
TD
Obp
. .
Baker Hughes Incorporated
INTEQ Planning Report
B..
8AKR:
......
INT.F.Q
Plan Section Information
9947.43 88.42 309.08 8808.24 2093.53 508.91 0.00 0.00 0.00 0.00
9983.12 88.24 304.93 8809.28 2114.99 480.42 11.63 -0.50 -11.63 267.46
10000.00 88.27 304.66 8809.79 2124.62 466.57 1.61 0.18 -1.60 276.34
10020.00 89.54 303.39 8810.17 2135.81 450.00 9.00 6.37 -6.36 315.00
10060.00 89.55 295.39 8810.49 2155.42 415.17 20.00 0.01 -20.00 270.00
10410.00 89.85 225.39 8812.62 2100.54 91.16 20.00 0.09 -20.00 270.00
10900.00 89.06 166.59 8817.74 1649.92 -37.96 12.00 -0.16 -12.00 269.00
11100.00 89.15 142.59 8820.91 1470.62 47.23 12.00 0.04 -12.00 -90.00
11400.00 89.31 178.59 8825.09 1192.33 145.30 12.00 0.05 12.00 90.00
11700.00 89.44 142.59 8828.48 914.04 243.37 12.00 0.04 -12.00 -90.00
12000.00 88.37 178.58 8834.40 635.79 341.47 12.00 -0.36 12.00 92.00
Survey
9947.43 88.42 309.08 8750.25 2093.53 508.91 5961973.82 677780.61 0.00 -2129.91 0.00 MWD
9950.00 88.41 308.78 8750.32 2095.14 506.91 5961975.39 677778.58 11.63 -2131.35 267.46 MWD
9975.00 88.28 305.87 8751.04 2110.29 487.04 5961990.07 677758.36 11.63 -2144.71 267.46 MWD
9983.12 88.24 304.93 8751.29 2114.99 480.42 5961994.61 677751.63 11.63 -2148.82 267.55 MWD
10000.00 88.27 304.66 8751.80 2124.62 466.57 5962003.91 677737.56 1.61 -2157.20 276.34 MWD
10020.00 89.54 303.39 8752.18 2135.81 450.00 5962014.70 677720.73 9.00 -2166.90 315.00 MWD
10025.00 89.54 302.39 8752.22 2138.52 445.80 5962017.32 677716.46 20.00 -2169.24 270.00 MWD
10050.00 89.55 297.39 8752.42 2150.98 424.13 5962029.26 677694.51 20.00 -2179.76 270.01 MWD
10060.00 89.55 295.39 8752.50 2155.42 415.17 5962033.49 677685.45 20.00 -2183.40 270.05 MWD
10075.00 89.55 292.39 8752.62 2161.49 401.46 5962039.23 677671.60 20.00 -2188.26 270.00 MWD
10100.00 89.55 287.39 8752.82 2170.00 377.96 5962047.18 677647.91 20.00 -2194.68 270.02 MWD
10125.00 89.56 282.39 8753.01 2176.42 353.81 5962053.03 677623.61 20.00 -2198.97 270.06 MWD
10150.00 89.57 277.39 8753.20 2180.71 329.19 5962056.74 677598.90 20.00 -2201.10 270.10 MWD
10175.00 89.58 272.39 8753.39 2182.84 304.29 5962058.28 677573.96 20.00 -2201.05 270.14 MWD
10200.00 89.60 267.39 8753.56 2182.79 279.29 5962057.64 677548.97 20.00 -2198.82 270.18 MWD
10225.00 89.62 262.39 8753.73 2180.56 254.40 5962054.82 677524.14 20.00 -2194.43 270.21 MWD
10250.00 89.64 257.39 8753.89 2176.17 229.80 5962049.86 677499.65 20.00 -2187.92 270.25 MWD
10275.00 89.67 252.39 8754.04 2169.65 205.67 5962042.77 677475.69 20.00 -2179.32 270.28 MWD
10300.00 89.70 247.39 8754.18 2161.06 182.20 5962033.63 677452.43 20.00 -2168.72 270.31 MWD
10325.00 89.73 242.39 8754.31 2150.45 159.58 5962022.49 677430.06 20.00 -2156.18 270.34 MWD
10350.00 89.76 237.39 8754.42 2137.91 137.96 5962009.45 677408.74 20.00 -2141.80 270.36 MWD
10375.00 89.79 232.39 8754.52 2123.54 117.51 5961994.59 677388.65 20.00 -2125.70 270.38 MWD
10400.00 89.83 227.39 8754.60 2107.44 98.40 5961978.04 677369.92 20.00 -2107.99 270.40 MWD
10410.00 89.85 225.39 8754.63 2100.54 91.16 5961970.98 677362.84 20.00 -2100.49 270.42 MWD
10425.00 89.81 223.59 8754.67 2089.84 80.65 5961960.03 677352.59 12.00 -2088.91 269.00 MWD
10450.00 89.76 220.59 8754.76 2071.29 63.90 5961941.09 677336.28 12.00 -2068.97 269.01 MWD
10475.00 89.71 217.59 8754.88 2051.88 48.13 5961921.33 677320.98 12.00 -2048.27 269.02 MWD
10500.00 89.66 214.59 8755.02 2031.68 33.41 5961900.79 677306.74 12.00 -2026.86 269.03 MWD
10525.00 89.61 211.59 8755.18 2010.74 19.76 5961879.53 677293.59 12.00 -2004.81 269.05 MWD
10550.00 89.56 208.59 8755.36 1989.11 7.23 5961857.61 677281.57 12.00 -1982.17 269.07 MWD
10575.00 89.52 205.59 8755.56 1966.86 -4.15 5961835.10 677270.72 12.00 -1959.01 269.09 MWD
10600.00 89.47 202.59 8755.78 1944.04 -14.35 5961812.04 677261.06 12.00 -1935.39 269.11 MWD
10625.00 89.43 199.59 8756.02 1920.72 -23.35 5961788.52 677252.62 12.00 -1911.37 269.14 MWD
10650.00 89.38 196.59 8756.28 1896.96 -31.11 5961764.58 677245.42 12.00 -1887.03 269.17 MWD
10675.00 89.34 193.59 8756.56 1872.82 -37.61 5961740.30 677239.49 12.00 -1862.42 269.20 MWD
10700.00 89.30 190.59 8756.85 1848.38 -42.85 5961715.75 677234.83 12.00 -1837.61 269.23 MWD
10725.00 89.26 187.59 8757.17 1823.70 -46.80 5961690.98 677231.46 12.00 -1812.68 269.27 MWD
10750.00 89.23 184.59 8757.49 1798.85 -49.45 5961666.07 677229.40 12.00 -1787.69 269.30 MWD
10775.00 89.20 181.59 8757.84 1773.89 -50.80 5961641.09 677228.64 12.00 -1762.71 269.34 MWD
10800.00 89.17 178.59 8758.20 1748.89 -50.84 5961616.11 677229.19 12.00 -1737.81 269.39 MWD
Obp
. .
Baker Hughes Incorporated
INTEQ Planning Report
...
....
INTEQ
Survey
10825.00 89.14 175.59 8758.57 1723.93 -49.57 5961591.18 677231.05 12.00 -1713.05 269.43 MWD
10850.00 89.11 172.59 8758.95 1699.07 -46.99 5961566.39 677234.21 12.00 -1688.51 269.47 MWD
10875.00 89.09 169.59 8759.34 1674.38 -43.12 5961541.80 677238.66 12.00 -1664.25 269.52 MWD
10900.00 89.06 166.59 8759.75 1649.92 -37.96 5961517.47 677244.40 12.00 -1640.34 269.57 MWD
10925.00 89.07 163.59 8760.15 1625.77 -31.53 5961493.48 677251.40 12.00 -1616.84 270.00 MWD
10950.00 89.07 160.59 8760.56 1601.99 -23.84 5961469.89 677259.64 12.00 -1593.81 270.05 MWD
10975.00 89.08 157.59 8760.97 1578.64 -14.92 5961446.76 677269.11 12.00 -1571.33 270.10 MWD
11000.00 89.08 154.59 8761.37 1555.79 -4.79 5961424.16 677279.78 12.00 -1549.45 270.15 MWD
11025.00 89.10 151.59 8761.76 1533.51 6.52 5961402.14 677291.61 12.00 -1528.24 270.19 MWD
11050.00 89.11 148.59 8762.16 1511.84 18.99 5961380.78 677304.58 12.00 -1507.74 270.24 MWD
11075.00 89.13 145.59 8762.54 1490.86 32.57 5961360.13 677318.66 12.00 -1488.02 270.29 MWD
11100.00 89.15 142.59 8762.92 1470.62 47.23 5961340.24 677333.79 12.00 -1469.14 270.34 MWD
11125.00 89.15 145.59 8763.29 1450.37 61.89 5961320.35 677348.92 12.00 -1450.25 90.00 MWD
11150.00 89.15 148.59 8763.66 1429.39 75.47 5961299.69 677363.00 12.00 -1430.53 89.96 MWD
11175.00 89.16 151.59 8764.03 1407.73 87.94 5961278.33 677375.97 12.00 -1410.03 89.91 MWD
11200.00 89.16 154.59 8764.40 1385.44 99.25 5961256.32 677387.80 12.00 -1388.82 89.87 MWD
11225.00 89.17 157.59 8764.76 1362.59 109.38 5961233.71 677398.47 12.00 -1366.94 89.82 MWD
11250.00 89.19 160.59 8765.12 1339.24 118.30 5961210.58 677407.94 12.00 -1344.46 89.78 MWD
11275.00 89.20 163.59 8765.47 1315.46 125.99 5961186.99 677416.19 12.00 -1321.43 89.74 MWD
11300.00 89.22 166.59 8765.81 1291.31 132.42 5961163.00 677423.19 12.00 -1297.93 89.69 MWD
11325.00 89.24 169.59 8766.15 1266.85 137.58 5961138.67 677428.92 12.00 -1274.02 89.65 MWD
11350.00 89.26 172.59 8766.48 1242.16 141.46 5961114.08 677433.37 12.00 -1249.76 89.61 MWD
11375.00 89.28 175.59 8766.80 1217.29 144.03 5961089.28 677436.53 12.00 -1225.21 89.57 MWD
11400.00 89.31 178.59 8767.10 1192.33 145.30 5961064.36 677438.39 12.00 -1200.46 89.53 MWD
11425.00 89.31 175.59 8767.40 1167.37 146.57 5961039.44 677440.25 12.00 -1175.70 270.00 MWD
11450.00 89.31 172.59 8767.71 1142.51 149.14 5961014.64 677443.41 12.00 -1151.16 270.04 MWD
11475.00 89.32 169.59 8768.00 1117.81 153.02 5960990.05 677447.86 12.00 -1126.89 270.07 MWD
11500.00 89.32 166.59 8768.30 1093.35 158.18 5960965.72 677453.60 12.00 -1102.98 270.11 MWD
11525.00 89.33 163.59 8768.59 1069.20 164.61 5960941.73 677460.60 12.00 -1079.48 270.14 MWD
11550.00 89.34 160.59 8768.88 1045.42 172.30 5960918.13 677468.84 12.00 -1056.46 270.18 MWD
11575.00 89.35 157.59 8769.17 1022.07 181.22 5960895.00 677478.31 12.00 -1033.97 270.21 MWD
11600.00 89.37 154.59 8769.45 999.22 191.35 5960872.40 677488.98 12.00 -1012.09 270.25 MWD
11625.00 89.38 151.59 8769.72 976.93 202.66 5960850.39 677500.82 12.00 -990.88 270.28 MWD
11650.00 89.40 148.59 8769.98 955.26 215.13 5960829.02 677513.79 12.00 -970.38 270.31 MWD
11675.00 89.42 145.59 8770.24 934.28 228.71 5960808.37 677527.86 12.00 -950.66 270.35 MWD
11700.00 89.44 142.59 8770.49 914.04 243.37 5960788.47 677543.00 12.00 -931.77 270.38 MWD
11725.00 89.34 145.58 8770.76 893.79 258.03 5960768.58 677558.13 12.00 -912.88 92.00 MWD
11750.00 89.23 148.58 8771.07 872.81 271.62 5960747.93 677572.20 12.00 -893.16 91.97 MWD
11775.00 89.13 151.58 8771.42 851.15 284.08 5960726.57 677585.18 12.00 -872.67 91.93 MWD
11800.00 89.04 154.58 8771.82 828.86 295.40 5960704.55 677597.01 12.00 -851.45 91.89 MWD
11825.00 88.94 157.58 8772.26 806.01 305.53 5960681.95 677607.68 12.00 -829.57 91.84 MWD
11850.00 88.85 160.58 8772.75 782.67 314.46 5960658.83 677617.15 12.00 -807.10 91.79 MWD
11875.00 88.76 163.58 8773.27 758.89 322.15 5960635.24 677625.40 12.00 -784.08 91.73 MWD
11900.00 88.68 166.58 8773.83 734.74 328.58 5960611.25 677632.41 12.00 -760.58 91.67 MWD
11925.00 88.59 169.58 8774.42 710.29 333.74 5960586.93 677638.14 12.00 -736.67 91.60 MWD
11950.00 88.52 172.58 8775.05 685.60 337.62 5960562.34 677642.60 12.00 -712.42 91.53 MWD
11975.00 88.44 175.58 8775.72 660.75 340.20 5960537.56 677645.76 12.00 -687.88 91.45 MWD
12000.00 88.37 178.58 8776.41 635.79 341.47 5960512.64 677647.63 12.00 -663.13 91.37 MWD
15~08CL
Date: 1/6/2005
#i3
(15~08/P[a'f1
#i3
Plan
Pia
T
LEGEND
0.02 AM
1/7/2005
BP Amoco
WELl-PATH DETAILS
Phiin#ß 'fs.G3CL 1
500292118:060
ParøntWeJlp$¡ttI: ,....c
Tie_HID: 9947.43-
Rtg~ 57.99' 57.99ft
Ref. Datum:
V.hctiQ1'¡ ~~ ~r.i:; :=~D
""...
185,00' .... .... 26.99
REFERENCE INFORMATION
TVU ....
· .
All Measurements are from top of Riser
1/7/2005
~
CD
(j)
.-
a:
15-08CL 1
top of bag
r
"
BAG
71/16" 5000 psi.
\.
~
bttm of bag
middle of slips
Blind/Shears
..........................
middle of pipes
2 3/8" combi ram/slips
I
I
TOTs
L.............········· 7 1/16" 5000psi
...---.
...---.
middle of flow cross
Mud Cross
Mud Cross
7 1/16" 5000psi
'----'
""----"
middle of blind/shears
I variable bore pipe 3 1/2"-27/8"
I
r··
.......................,
middle of pipe/slips
TOTs
23/8" combi ram/slips 1..........................71/16" 5000psi
Flow Tee
TERRIEL HUBBlE
BP EXPLORATION AK INC
PO BOX 196612 MB 7-5
ANCHORAGE, AK 99519-6612
89-6/1252
172
DATË DI- (O"OS
b"~.~o'l'E~_... . .. ~....~... .......ro/PD6.. ... C'c $ 1 OD.W
C)..(¿ ~FWl'()Æ1 ~ <=9)~ DOLLAR5_
First. N,,"ono,. B.ankAI.a. 'k. a ~_ '..
::::or;S:Ö~ L t 7 'J!)vkt~. ~
"Mastercard Check"
.
I: ~ 25 20UObOI:~~ ~t."lb 2 27"' ~55b"· 0 ~7 2
.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ~~0
IS-07C¿/
'-
PTD#
ZOS- ..JOd_L;"
X Development
Service
CHECKWHAT
APPLJES
ADD-ONS
(OPTIONS)
M1JLTI
LATERAL
x
(If API number
last two (2) digits
are between 60-69)
Exploration
Stratigraphic
~'CLUE"·
Tbe permit is for a new well bore ·segment of
existing well l-ð ~ / § - P <?C-
Permit No,2oJ~/¿/ API No. 50-~ f__¿J}?ð ....t:).J
ProductioD. sbould continue to be reponed as
a function ·of tbe original API number. stated
above. .
BOLE )n accordance witb 20 AAC 25.005(1), aU
records, data and logs acquired for tbe pilot
bole must be clearly differentiated In botb
name (name on permit plus PH)
and API Dumber (SO
70/80) from records, data and logs acquired
for wen (name on permit).
PJLOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved subject ·to fun
compliance witb 20 AAC 2S..0SS~ Approval10
perforate and produce is contingent upon
issuance of ~ conservation order approving a
spacing exception.
(Company Name) assumes tbe liability of aDY
protest to tbe spacing .~Jcep1ion tbat may
occur.
AU dry ditcb sample sets submitted to tbe
Commission must be in no greater 1baD 30'
sample intervals from below tbe permafrost
or from wbere samples are fint caught aDd
] 0' sample iIiter:vals through target zones.
.
.
~
D
Well bore seg
Annular Disposal
ield & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT 15-08CL 1 Program DEV
LORATION (ALASKA) INC Initial ClassfType DEV 11-0IL~GeoArea 890 Unit 11650 On/Off Shore On
Pe(mit fee attached Y.es
2 .Leas.e .n!Jmber .apRro¡:¡riat.e. . - - - - - Yes
3 .U.nlq!Je weltn.am.e.a!lc! Ol!llJb.er . . . . . . . . . . . . . . . . . . . . . . ...... Yes - - - - - - - - - - - - - - - -
4 Well JQc¡¡t.ed lna defil1e.d .ppol. - - - - - - Y.es
5 W~IIJQc¡¡t.ed prop~r .dlsta!lce from driJIing !Jl1itboUl1d.al)'. . Yes - - - -
6 W~II JQc¡¡t.ed pr.oper .distance. from Qther wet!s. Y.es - - - - ~
7 S.uffiçiel1taçreage.ayailable indrilJiog unjt . Yes
8 Jfd.eviated, js weJlbQre platil1cluded . . - - - - ~ - - - - - Y.es
9 Ope(ator ()I]Iy- affeçted party. . . . . . . - - - - - - - - - - Yes - - - - - -
10 .Ope(ator bas.apprpprlate.b.ond inJQrce. . . . . . . . . . . . . . . . . .... Yes - - - - - - - - - - - - - - - - . - -
11 P.el111it ca!l be lSSl!ed wjtbQut co.nservatiOI1 order. . Y.es - - - - - - - - - - - - -
Appr Date 12 P.e(llJit c.a!l be iSSl!ed wjthQut adllJil1ist(atille.appr.ovaJ . . . . . . . . · . . . Y.es
RPC 1/11/2005 13 Can permit be approved before 15-day wait Yes
14 We.IIJQc¡¡ted withil1 area alld.strat¡¡authorized by l!ljectipo Ord.e( # (P!JUO# in.c.omme!lts) (ForNA - - - - --
15 .AllwelJs.wit)1lnJl4.mile.ar~a.of(eYiewjd.eotified(F.o(Servjc.ew.ellOl1ly)............... NA. - - -- - - - - - - - - --
16 Pre-produçecl i!ljector; .duratio.n of pre-pro.ductipl1 l.ess. than 3 mOl1ths (For.ser:vlce well Qnly) . NA
17 ACMP F"il1djng.of CQn.si,Ste!lcy h.as been iss!Jedfor this project . . . . . . .NA - - - - - - - - - - - -
Engineering 18 .C.oodu.ctor st(illg.prQvided . . . . . . . NA - - - - - -
.19 .Surfac.ecasil1g.pJQtec.ts all.known USDWs . . - - - - - - - - - - NA
I
20 CMT.v.oladequate.to çirc.uLateoncOl1d.uçtpr.& SUJf.C$g . . - - - - - NA
21 CMT. vol adequate.to tie-inJQngstri!lg to.s!J1"f çsg. . . . . . NA
22 CMT. wit! coyera)l koow.npro.d!Jctiye hQrizons. . . . - - - - - NA Slotted, - - - - - -
23 C.asi!lg desig!lS aclequa.t~ f.o( C,.T, B& ¡:¡ermafros! . . . . . - - - - - Y.es
24 A.dequatetankage.oJ reserve pit. · . . . Y.es CTDU........... .
25 Jfa.re-.d(iII~ has a lOA03 fQr abandOllllJent be.e!l ¡¡PPJQv!:d . NA Lateral.
26 .A.dequate.,^"ellbor~ separ¡¡tjo.n.propose.d. . . . - - - - - - - - - - - - - - - - -- . . . . . . . . .Y.es - - - - - - - - - - - - - - - - - -
27 Jfdjv!:ct~r required, dQes it me!:t reguJatipos - - - - - - NA Sidet(ack. . - - - - - -
Appr Date 28 DriUiog fJujd.¡:¡rQgrallJ sch!:matic& eQ.uipJis!adequate. - - - - - - - - - - Yes Max MW8Ji ¡:¡pg.
WGA 1/12/2005 29 .B.OPEs, do .they me!:t reguJatioo . . . . . . . . - - - - - - - - - - - - Yes - - - - - -
30 BOPE.pr~ss ratillg app(op(iate;.test to.(put PSig In.comm!:l1ts). . · . . . Y.es T~st to 3500. ¡:¡sLMSF> 24.20 psi
31 C.hokemanifold çQllJpJies w/APt RF>-53 (May 134). . . . . . . Y.es - - - - - - -
32 WQrk will pcc.U( withoutoperationshutdow.n. . . Yes
33 .Is Rresence. Qf H2S gas ¡:¡rQb.abl!: . No. IIIQt.<l1l H2S pad.
34 Meçba.nicalcpodJUon .ot w~lIs withil1 AOR yerifiecl (Forservje¡: w!:1J Ollly). . NA
Geology 35 P!:(llJit call be lSSl!ed wfo hydr.ogen sulfide meaSJJœs. . . N.o
36 .D.ata.pr~s!:otecl Qn. ¡:¡ote.ntial PveJRress!Jr!: .zOl1es. - - - - ~ NA
Appr Date 37 .S!:ismicanalysjs. Qf sbaJlow gasz.o1les . . . . . NA
- - - - -
RPC 1/11/2005 38 .S.eabe.dcondjtipo sl!rvey(if Off-sh.o(e) . NA
- - - - - - -
139 CQnta.ct namelphOlleJQr,^"ee~ly progress reports [explQratpry .o!lly] - - - - - NA
Geologic Date: Engineering Date (~" Date
Commissioner: Commissioner:
OG:s ( J 2f--S Ø~r
.
.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
e
e
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Mar 08 16:16:01 2007
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .07/03/08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name......... ... .LISTPE
Date.................... .07/03/08
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name... ....... ... ...UNKNOWN
Continuation Number... ...01
Previous Tape Name..... ..UNKNOWN
Comments....... ........ ..STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
15-08CL1
500292118060
BP Exploration (Alaska) Inc.
Sperry Drilling Services
08-MAR-07
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
W-0003560124
B. JAHN
B. HOLT/B. L
MWD RUN 2
W-0003560124
B. JAHN
B. HOLT/B. L
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
22
11N
1U:
164,5
1378
MSL 0)
57.99
dD6 --roS- "= 11.157-3
e
e
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
3.750 4.500 10016.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS
ARE MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF
WHICH WAS AT
10016'MD/8752'TVDSS IN THE 15-08C WELLBORE.
4. MWD RUNS 1 & 2 COMPRISED DIRECTIONAL AND NATURAL
GAMMA RAY (PCG)
UTILIZING A SCINTILLATION DETECTOR.
5. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A
SCHLUMBERGER
CASED-HOLE GAMMA RAY LOG RUN IN 15-08C LION 1 MARCH
2005. LOG
HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE
PDC LOG DATA
WERE PROVIDED BY D. DORTCH ON 10 JANUARY 2007.
6. MWD RUNS 1 & 2 REPRESENT WELL 15-08C L1 WITH API#:
50-029-21180-60.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
12317'MD/8765'TVD.
SROP
SGRD
$
SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SMOOTHED NATURAL GAMMA RAY COMBINED.
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .07/03/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name..... ..STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
9972.5
10041.0
STOP DEPTH
12296.0
12326.5
e
e
$
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH --
BASELINE DEPTH GR
9973.0 9961. 5
9977.5 9967.0
9986.0 9975.5
10013.5 10004.0
10016.0 10007.0
10020.0 10011.0
10025.5 10015.5
10027.5 10018.5
10029.0 10019.5
10030.5 10021.5
10041.0 10032.5
10047.0 10038.0
10050.5 10042.5
10082.5 10073.5
10099.5 10090.0
10111.5 10101. 5
10117.0 10106.0
10126.0 10115.5
10134.5 10124.5
10138.0 10128.0
10153.5 10143.5
10158.5 10148.5
10181. 0 10172.0
10183.0 10174.0
10189.5 10179.5
10202.5 10192.5
10218.5 10208.5
10220.0 10210.5
12326.5 12317.0
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 9961.0 10450.0
MWD 2 10450.0 12317.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... .......... . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.... .........Undefined
Absent value.......... ........... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
GR MWD
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
API 4 1 68 4 2
e
e
ROP MWD
FT/H
4
1 68
8
3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9972.5 12326.5 11149.5 4709 9972.5
12326.5
GR MWD API 28.46 938.95 78.0616 4605 9972.5
12296
ROP MWD FT/H 9.55 3869.02 135.913 4572 10041
12326.5
First Reading For Entire File......... .9972.5
Last Reading For Entire File.......... .12326.5
File Trailer
Service name....... ... ...STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..07/03/08
Maximum Physical Record..65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name. ....... ... ..STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......07/03/08
Maximum Physical Record. .65535
File Type................ LO
Previous File Name.... ...STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
9961.0
10032.5
STOP DEPTH
10419.5
10450.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
26-FEB-05
Insite
7.75
e
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction........ ........ . Down
Optical log depth units.......... .Feet
Data Reference Point... ........ ...Undefined
Frame Spacing.... ...... ....... ....60 .1IN
Max frames per record........... ..Undefined
Absent value. ........ ............ .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
GR MWD010
ROP MWD010
Units
FT
API
FT/H
Code
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
e
Memory
10450.0
10032.0
10450.0
86.0
94.4
TOOL NUMBER
TLGOll
3.750
10016.0
Flo Pro
8.60
65.0
9.0
23000
10.2
.000
.000
.000
.000
.0
145.9
.0
.0
Offset
o
4
8
Channel
1
2
3
e
e
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9961 10450 10205.5 979 9961
10450
GR MWD010 API 32.74 938.95 86.3036 873 9961
10419.5
ROP MWD010 FT/H 16 161.96 60.3341 836 10032.5
10450
First Reading For Entire File......... .9961
Last Reading For Entire File.. ........ .10450
File Trailer
Service name........... ..STSLIB.002
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation. .... ..07/03/08
Maximum Physical Record..65535
File Type............ ....LO
Next File Name........ ...STSLIB.003
Physical EOF
File Header
Service name....... ... ...STSLIB.003
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation...... .07/03/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
10420.0
10450.5
STOP DEPTH
12286.5
12317.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
01-MAR-05
Insite
7.75
Memory
12317.0
10450.0
12317.0
e
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record...... ...... . Undefined
Absent value.. ... ...... .... ...... .-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub--type... 0
Name
DEPT
GR
ROP
Service Order
Nsam Rep
1 68
1 68
1 68
Code
Units
FT
API
FT/H
Size
4
4
4
MWD020
MWD020
Last
Name Service Unit
Reading
Min
Max
e
84.4
93.6
TOOL NUMBER
TLG015
3.750
10016.0
Flo Pro
8.70
65.0
8.5
24000
5.8
.000
.000
.000
.000
.0
162.8
.0
.0
Offset
o
4
8
Channel
1
2
3
First
Mean Nsam
Reading
e
e
DEPT FT 10420 12317 11368.5 3795 10420
12317
GR MWD020 API 28.46 199.85 75.9726 3734 10420
12286.5
ROP MWD020 FT/H 9.55 3869.02 152.858 3734 10450.5
12317
First Reading For Entire File......... .10420
Last Reading For Entire File.... ...... .12317
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number... ...... ..1.0.0
Date of Generation..... ..07/03/08
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .07/03/08
Origin.................. .STS
Tape Name.............. ..UNKNOWN
Continuation Number..... .01
Next Tape Name. . . . . . . . . . .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Reel Trailer
Service name........... ..LISTPE
Date.................... .07/03/08
Origin.................. .STS
Reel Name............... .UNKNOWN
Continuation Number.... ..01
Next Reel Name. . . . . . . . . . .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File