Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-005 . . Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~.w- () 05 Well History File Identifier Organizing (done) o Two-sided 11111111111" 111111 o Rescan Needed 1111111111111 111111 RESCAN ~Ior Items: u;t6reYSCale Items: \ p~ DIGITAL DATA )Ø15iskettes, No. ~ o Other, No/Type: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Dale Lt 11,1 D 7 o Other:: BY: ~ 151 '(Y\f 111111111111111111I Project Proofing BY: ç Maria) Date t+ I /3. 0 7 /& mf I X 30 = 30 + 1* = TOTAL PAGES ~'+ Dale 4-1 13 I () 7 (Counl doe, noti~~I;~I~ I~;~;I~~~; rvrP Scanning Preparation BY: ~ <! Production Scanning Stage 1 Page Count from Scanned File: L/-5 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES BY: ~ Date:~/ 13/07 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO /,/ VV1 P NO BY: Maria Date: Isl 11111111111I1111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked 11111111111I1111111 10/6/2005 Well History File Cover Page.doc BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS 15 Dear Mr. Maunder, bP a~s/~°s ~f ~~ G Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 15 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-15 Date: 01/05/10 ~~~ Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 15-01 B 2042570 50029206960200- NA Sealed NA 15-02B 2060720 50029206970200 NA Sealed NA 15-03 1820300 50029207220000 NA Sealed NA 15-04B 2071380 50029207260200 NA Sealed NA 15-05A 1950340 50029207310100 NA Sealed NA 15-06A 1982540 50029207420100 NA 6.7 NA 40.8 11 /7/2009 15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009 15-08C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009 15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11/11/2009 15-10A 1880850 50029205010100 NA Sealed NA 15-11 B 2041460 50029206530200 NA Sealed NA 15-126 2060870 50029206650200 NA Sealed NA 15-13A 1991240 50029206450100 NA Sealed NA 15-14A 2042220 50029206820100 NA Sealed NA 15-15C 2081820 50029206910300 NA Sealed NA 15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009 15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009 15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009 15-19A 1990990 50029218290100 NA surface NA 15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009 15-21A 1990290 50029205030100 NA Sealed NA 15-22 1800970 50029205090000 NA Sealed NA 15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009 15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009 15-25B 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009 15-266 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009 15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009 15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11/9/2009 15-29B 2090380 50029222590200 NA 0.1 NA 1.7 11 /10/2009 15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11/11/2009 15-31 B 2050860 50029222850200 NA 1.2 NA 3.4 11l11I2009 15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009 15-336 2031940 50029224480200 NA 1.6 NA 10.2 11/29/2009 15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009 15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009 15-36B 2060730 50029224800200 NA 1 NA 5.1 11/10/2009 15-37B 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009 15-38A 2030160 50029224960100 NA Sealed NA 15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11/9/2009 15-40A 1980980 50029225110100 NA 1 NA 5.1 11/9/2009 15-41B 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009 15-42B 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009 15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009 15-456 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009 15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009 15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009 15-486 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009 15-496 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009 • • -~~~ ~. MICROFILMED 03/01 /2008 DO NOT PLACE a~~~~~ ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFicheiC~+rPgs_lnserts\Microfilm Marker.~c . . \VELL LOG TR~NSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 May 11, 2007 RE: MWD Formation Evaluation Logs: 15-08C L1, AK-MW-3560124 15-08C Ll: LAS Data & Digital Log Images: 50-029-21180-60 SCANNED MAY 172007 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETUR1~ING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Date 41./01- Signed:~~ Note: This data replaces any previous data for 15-08C L 1. 0/\Çno6 it- /Sí3Šo C:t' \./ '-' - w > """""" UJ Ü W D:: i""- C::> C::> ""-! o ¡¡¡ .~ ~ 8 !d~ õ~ u~ !~ ~< a , ~ ~ ~ ~ 3>~ DATA SUBMITTAL COMPLIANCE REPORT 4/11/2007 Permit to Drill 2050050 Well Name/No. PRUDHOE BAY UNIT 15-08CL 1 Operator BP EXPLORATION (ALASKA) INC ~ý<Ote!. ),rfi?:ùtfF API No. 50-029-21180-60-00 MD 12317""'-- TVD 8824./ Completion Date 3/3/2005"- Completion Status 1-01L Cu rrent Status 1-0 I L UIC N -~~--.~-..---- ~_.__._-~ REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes _.----------- ~.-'.__._--- DATA INFORMATION Types Electric or Other Logs Run: MWD GR / EWR, MGR / CCL Well Log Information: (data taken from Logs Portion of Master Well Data Maint Log/ Electr e' Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ~-:---D -~~----,_.- 1Zt Asc Directional Survey 9983 12291 Open 3/29/2005 Directional Survey 9983 12291 Open 3/29/2005 UD/ D Asc Directional Survey 9947 12317 Open 4/27/2005 IIFR A C j..as"" ¡..( S 14347 !.A6uc;uon/Reslstwity CI.:...<.,- 8384 c~~ LIS VERI, GR, CCL 10222 ~ 1/22/2007 ~ C Lis 14573 I nd u ction/Resistivity 9972 12326 Open 4/4/2007 LIS Veri, GR, ROP :z 14573 LIS Verification 9972 12326 Open 4/4/2007 LIS Veri, GR, ROP I l__~.~ J Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y /~ Chips Received? "T"tN- Analysis '-t'71f Received? Daily History Received? tlN Ò/N e Formation Tops Comments: Compliance Reviewed By: -"-"~£-v' '.. . --.-'.- -' Date: ¡TlJp '-i~ -;-- ~~"--"_._-,- e - 'VELL LOG TR;\NSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West th Avenue, Suite 100 Anchorage, Alaska 99501 March 9,2007 RE: MWD Fonnation Evaluation Logs: 15-08C L1, AK-MW-3560124 1 LDWG fonnatted CD rom with verification listing. API#: 50-029-21180-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING Al~D RETlJRNING A COpy OF THE TRA1~SMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: /Î if -- Signed:LJ<{/~ ~ i ¡ _ "'ì . --- ... "'. ",. (:y(,/.:) - OU,) :# /¿Js-?3 1 :" Schlull1berger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth - é)O~--OOS -Jt (L("3 </7- Well Job# log Description Date Bl MPS-10A 11076475 CH EDIT SCMT (PDC-GR) 10/17/05 15..o8CL 1 10942196 CH EDIT JEWELRY (PDC-GR) 03/01/05 Z-12 11513657 RST 12/06/06 1 l3-11 11533392 RST 12/31/06 1 AGI-10A 11485869 USIT 11/09/06 GNI-02A 11485873 USIT 11/15/06 GNI-02A 11485874 MDT 12/03/06 12-18 N/A USIT 11/17/06 NGI-07A 11212892 USIT 10/13/06 DS 12-14Al1 11540230 CORROSION & CBl 12/18/06 01-23 11549351 US IT 12/16/06 WGI-09 11486172 USIT 12/03/06 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: 01/22/2007 NO. 4112 Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color CD 1 1 1 1 . 1 1 1 1 1 1 1 1 . Alaska Data & 2525 Gambell S Anchorage, AK 99503-2838 ATTN: Beth ,,) I} F-. F_. Received by: . STATE OF ALASKA . RECE\VEO ALAS~L AND GAS CONSERVATION COM ION 5 WELL COMPLETION OR RECOMPLETION REPORT AND LOG APR - 5 '2.0G C mm\ssion 0'\ & Gas Cons. 0 (1\8s\(a \ 1b. Well ClasAnÒ\úfa\\C 1m Development D Exploratory D Stratigraphic D Service 12. Permit to Drill Number 205-005 13. API Number 50-029-21180-60-00 14. Well Name and Number: . No. of Completions 1a. Well Status: 1m Oil D Gas D Plugged D Abandoned D Suspended D WAG 20AAC 25.105 20AAC 25.110 CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVP HOLE SIZE WT. PER FT. GRADE lOP BoTTOM Top BoTTOM SIZE 20" 91.5# H-40 Surface 90' Surface 90' 30" 13-3/8" 72# L-80 Surface 2539' Surface 2539' 17-1/2" 9-518" 47# L-80 Surface 7448' Surface 7189' 12-1/4" 7" 26# L-80 / 2640' 8772' 2640' 8339'[ 8-1/2" 4-1/2" 12.6# L-80 8600' 10016' 8200' 8811' 6-1/8" 2-7/8" 6.16# L-80 10029' 12170' 8812 8818 3-3/4" 23. Perforations open to Production (MD + TVD of Top and 24 Bottom Interval, Size and Number; if none, state "none"): . 2-7/8" Slotted Section MD TVD 10036' -12138' 8812' - 8818' D GINJ D WINJ D WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1645' SNL, 1378' EWL, SEC. 22, T11N, R14E, UM Top of Productive Horizon: 272' NSL, 2092' EWL, SEC. 15, T11 N, R14E, UM Total Depth: 1252' SNL, 1783' EWL, SEC. 22, T11N, R14E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- __6773g~_ y- _~59f!~.§I__ Zone- ASP4 TPI: x- 677986 y- 5961801 Zone- ASP4 Total Depth: x-- 677ÚS--- y- -5960271 Zone--ASP4 ___+_____________n ____________________ ______________ 18. Directional Survey 1m Yes D No 21. Logs Run: MWD GR / EWR, MGR I CCL 22. MD TVD 26. Date First Production: March 12, 2005 Date of Test Hours Tested PRODUCTION FOR 4/1/2005 4.2 TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 503 900 24-HoUR RATE One Other 5. Date Comp., Susp., or Aband. 3/3/2005 6. Date Spudded 2/25/2005 7. Date T.D. Reached 2/28/2005 8. KB Elevation (ft): 57.99' 9. Plug Back Depth (MD+ TVD) 12170 + 8818 10. Total Depth (MD+TVD) 12317 + 8824 11. Depth where SSSV set (Nipple) 2207' MD 19. Water depth, if offshore NI A MSL SIZE 4-1/2", 12.6#, 13Cr80 PBU 15-08CL 1 15. Field I Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 028306 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) CSMENTINGRËCORD 370 sx Permafrost II 1938 sx PF 'E', 400 sx PF 'C' 500sx Class 'G', 300 sx PF 'C' 534 sx 'G', 274 sx 'G', 223 sx 'G' 351 sx Class 'G' Uncemented Slotted Liner TUBING RECORD DEPTH SET (MD) 8602' AMOUNT PUllED PACKER SET (MD) 8546' 25. ACID,FRACTURE, CEMENT .SOUEEZE,. ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10062' Set WS-R-BB packer (Whipstock Retrieved) 2500' Freeze Protect with MeOH PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Flowing Oil -BBl 407 Oll-Bsl 2,328 GAs-McF 3,724 GAs-McF 21,279 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". 27. None ê c::: ... L::; , L ~;¡:;:" ò d... '¡, ¥-Ci ¡ ,?~ ..i Form 10-407 . RevT5ê~003 W ATER-Bsl -0- WATER-Bsl -0- LJ ¡ lJ ¡ ¡ AL CONTINUED ON REVERSE SIDE CHOKE SIZE I GAS-Oil RATIO 83.09 9,141 Oil GRAVITY-API (CORR) RBDMS 8Ft APR 11 2005 aý 28. . GEOLOGIC MARKERS 29. .ORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". From 15-08C: None Zone 1 A 9678' 8792' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed , ~. Lt. tfnJl.¡jA T'tl T h· I A . t t Terne Hubble - I e/\/l.Ll. ~ I e ec mca SSIS an PBU 15-08CL 1 205-005 Prepared By Name/Number: Well Number Drilling Engineer: Permit No. / Approval No. Date OLl/OS/Q)" Terrie Hubble, 564-4628 Sean McLaughlin, 564-4387 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well produèing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only . . 15-08CL 1 Prudhoe Bay Unit 50-029-21180-60-00 205-005 Accept: Spud: Release: Ri: PRE-RIG WORK 01/14/05 DRIFTED W/3.625 CENT & S.B. TO 9366' SLM (STOPPED DUE TO DEVIATION). 01/15/05 SET 4.5 WHIDDON C-SUB, PULLED LGLV'S FROM STA # 3 & 4. 01/17/05 SET 1" DGLV'S IN STA # 4 & 3, PULL 4.5 WHIDDON C-SUB (EMPTY). 01/23/05 CONDUCT BOPE TEST. CUT 150' PIPE. MU-WOT 3.68" WS DRIFT AND PDS GRICCL TOOLS. 01/24/05 RIH WITH WOTI WS 3.68" DRIFT AND PDS GRICCL. UNABLE TO GO PAST 9383'. POOH LD INSPECT TOOLS FOR DAMAGE, NO VISIBLE MARKS. RIH WITH 3"JSN TO 1 0200'. NO EXCESSIVE DRAG ANDIOR PULL. CIRC WELL WI 2% KCL FROM 10150 -7800'. POH, RIH WI 3.68000 X 13' DRIFT, NO DRAGIOVERPULL. CUT PIPE, MU NEW MHA. PU PDS MEMORY GAGES. RIH TO LOG FROM 10100' TO 8500' POH. 01/25/05 POH, VERIFY GOOD LOG DATA. MU/RIH WITH WOT WS ANCHOR PKR AND SPERRY SUN ORIENTING TOOL. DURING TOOL MAKE UP, SETTING SLEEVE MOVED PRE-SETTING BOTTOM SLIPS ON PKR. REMOVE PKR AND RETURN TO SHOP FOR RE-DRESSING. MU NEW WS PKR AND SPERRY ORIENT TOOLS. RIH WITH WS PKR ASSY. NO PROBLEMS ENCOUNTERED. SET WEATHERFORD WS-R-BB PKR AT 10056-62' SPERRY SUN ORIENTATION 307 DEG. POH FREEZE PROTECT WELL WI 40 BBLE 60/40 MEOH. FB FREEZE PROTECT FL. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 15-08 15-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 2/20/2005 Rig Release: 3/3/2005 Rig Number: 1 Spud Date: 9/16/1984 End: 2/22/2005 18:00 - 00:00 6.00 MOB P PRE Move to 15-08C 2/23/2005 00:00 - 22:30 22.50 MOB P PRE Move rig to H pad to lower derrick, continue to F Pad and raise derrick. Continue to DS 15. Wait on PE's to kill well. Spot rig over well. 22:30 - 00:00 1.50 MOB P PRE Grease tree. NU BOPE RIG ACCEPT: 22:30 hrs. 2/24/2005 00:00 - 02:00 2.00 MOB P PRE NU BOP. . Grease crew attempted to open SSV, no go. 02:00 - 10:00 8.00 BOPSUF P PRE Test BOP. - Witnessing of test waived by Chuch Scheve AOGCC representative. - Test witnessed by Well Site Leader - No tests failed. 10:00 - 10:30 0.50 BOPSUP P PRE Attempt to open SSV with valve crew. 10:30-11:15 0.75 BOPSUP P PRE Change pack off. OFF CRITICAL PATH: Wait on valve crew to bring appropriate fusable cap to location. - Fusable cap gripped with only 1.5 threads. Verifying minimum thread requirement. - Discussed with Anchorage approval to disable SSV. 11:15-13:30 2.25 BOPSUF P PRE Bring WFD whipstock to rig floor, confirmed seals and orientation. Install 3 RA tags. MU CTC and dart catcher. Pull test to 35k. OFF CRITICAL PATH: - Agreed to disable SSV. Performed risk assessment. - Pump open SSV and install gauge for pressure monitoring. 13:30 - 14:30 1.00 BOPSUF P PRE Pump dart. Coil volume at 56.1 bbls. - Pressure test CTC to 3500 psi. 14:30 - 15:00 0.50 BOPSUP P PRE Open well, on vacuum. - Master and swab: 24 turns. - Hole took 13 bbls to fill. 15:00 - 15:45 0.75 WHIP P WEXIT PU Whipstock. 15:45 - 17:30 1.75 WHIP P WEXIT RIH with whipstock assy. - At 9950' MD, PU 39.5k, SO 20.7k. - PU/SO wts show marginal change within 50' and 25'. 17:30 - 17:45 0.25 WHIP P WEXIT Set down at 10,082' MD. Set 6k down wt. PU to 48k SO (10k up) Set 6k down wt. PU and shear off at 63k (13k up) 17:45 - 19:30 1.75 WHIP P WEXIT POOH at 70 fpm. - Called for SLB mechanic, charge pressure low on power pack. 19:30 - 20:30 1.00 WHIP P WEXIT PU window milling assembly 20:30 - 22:00 1.50 DRILL P WEXIT RIH to 8609' tag 22:00 - 23:15 1.25 STWHIP P WEXIT Mill thru XN. 23: 15 - 00:00 0.75 STWHIP P WEXIT RIH tag at 10038 correct to 10015. Mill window -2.5/2.55 bpm @ 1840 psi. Time milling. 38K up wt, 20 K dn wt. Printed: 4/1/2005 11:12:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 15-08 15-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 2/20/2005 Rig Release: 3/3/2005 Rig Number: 1 Spud Date: 9/16/1984 End: 2/25/2005 00:00 - 08:00 8.00 STWHIP P WEXIT Mill window 2.5 /2.56 bpm at 1950 psi. FS 1750 psi. Pinch point at 10,015', window exit at 10,021' (corrected). 6' window. Mill 1 O' formation. - Geo sample shows formation. Dress window. - Begin fluid swap to flo pro. Dry tag. 08:00 - 08:30 0.50 STWHIP P WEXIT Swap well bore fluid to new flo pro (no reconditioned available due to lost circulation on last well, Y-10A). 08:30 - 10:00 1.50 STWHIP P WEXIT POOH with whipstock mills. 10:00 - 11 :00 1.00 STWHIP P WEXIT Stand back injector. Lay down mills. - String: 3.75" nogo /3.76" go · Pilot: 3.62" nogo / 3.63" go Discussed with ANC. RIH to dress window. PU rerun mills. - String: 3.78" nogo /3.79" go - Pilot: 3.79" nogo / 3.80" go Check coil for wear prior to RIH. Fusable cap installed. 11 :00 - 12:45 1.75 STWHIP P WEXIT RIH with window milling BHA #2. - Same configuration as BHA #1 - Pumping minimum rate. - Took weight at 8483' MD, no milling required. Likely bottom GLM. 12:45 . 13:45 1.00 STWHIP P WEXIT Dress Window. - Correct -21' to flag. TD at 10,031' MD. · Saw approximately 100 psi of motor work while dressing the window. - Continue to dress. · Dry tag. 13:45 - 15:30 1.75 STWHIP P WEXIT POOH with window milling BHA #2. 15:30 - 15:45 0.25 STWHIP P WEXIT Lay down mills. - String: 3.78" nogo / 3.79" go - Pilot: 3.79" nogo / 3.80" go 15:45 - 17:00 1.25 STWHIP P WEXIT Cut 100' of coil (chrome tubing managment) MU coil connector Pull test to 35k, pressure test to 3500 psi. 17:00 - 17:45 0.75 DRILL P PROD1 MU BHA #3. 17:45 - 19:30 1.75 DRILL P PROD1 RIH with build BHA #3. 19:30 - 21 :00 1.50 DRILL P PROD1 Orient 90L Directionally drill 2.6/2.62 bpm 3220 psi, 3070 psi = FS, 21:00 - 21:15 0.25 DRILL P PROD1 Tie in co recti on + 1'. RA at 10,019 Top of WS at 10016, Window 10016-10022. 21 :15·22:10 0.92 DRILL P PROD1 Directionally drill. - 2.6/2.6 @ 3200 psi. - ROP 60 22:10 - 22:25 0.25 DRILL P PROD1 Orient to 901L. 22:25 - 00:00 1.58 DRILL P PROD1 Directionally drill to 10173 2/26/2005 00:00 - 00:30 0.50 DRILL P PROD1 Directionally drilling 10,200. -2.6/2.6 bpm @ 3300 psi. FS 3000 psi Printed: 4/1/2005 11 :12:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 15-08 15-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 2/20/2005 Rig Release: 3/3/2005 Rig Number: 1 Spud Date: 9/16/1984 End: 2/26/2005 00:00 - 00:30 0.50 DRILL P PROD1 -37K Up wt -19K Dn wt . ROP70-80 00:30 - 00:45 0.25 DRILL P PROD1 Wiper to window. 00:45 - 04:15 3.50 DRILL P PROD1 Directionally drilling 10,350. -2.6/2.6 bpm @ 3300 psi. FS 3000 psi -37K Up wt -19K Dn wt - ROP70-80 04:15 - 04:40 0.42 DRILL P PROD1 Wiper to window. 04:40 - 08:00 3.33 DRILL P PROD1 Directionally drilling to 10,450'. - 2.6/2.6 bpm @ 3300 psi. FS 3000 psi - 37K Up wt -19K Dnwt - ROP20-30 08:00 - 09:30 1.50 DRILL P PROD1 POOH with build BHA. 09:30 - 10:30 1.00 DRILL P PROD1 LD probe, change motor bend to 1.0 deg. Bit in good condition. 10:30 - 12:15 1.75 DRILL P PROD1 RIH with Lateral BHA #4 - Shallow hole test orienter and pulser. 12:15 - 12:30 0.25 DRILL P PROD1 Orient left side for window. 12:30 - 13:00 0.50 DRILL P PROD1 RIH through window. Tie in to RA tag, -4' correction. RIH to bottom. 13:00 - 13:15 0.25 DRILL P PROD1 Orient TF to 120L. 13:15 - 16:30 3.25 DRILL P PROD1 Directionally drill to 10,600' MD. . 2.5/2.5 bpm @ 3200 psi. FS 2900 psi - 35K Up wt - 17K Dn wt - ROP 20-100 16:30 - 17:00 0.50 DRILL P PROD1 Wiper trip to window. 17:00 - 17:15 0.25 DRILL P PROD1 Orient TF to 100L. 17:15 - 20:35 3.33 DRILL P PROD1 Directionally drill to 10,760' MD. - 2.6/2.6 bpm @ 3400 psi. FS 3100 psi - 33K Up wt - 16K Dn wt - ROP 85 20:35 - 21 :20 0.75 DRILL P PROD1 Wiper to window. 21 :20 - 23:00 1.67 DRILL P PROD1 Directionally drill to 10,900' MD. - 2.4/2.4 bpm @ 3300 psi. FS 3000 psi - 33K Up wt - 16K Dn wt - ROP 130 Mud swap. 23:00 - 00:00 1.00 DRILL P PROD1 Wiper to window 2/27/2005 00:00 - 02:00 2.00 DRILL P PROD1 Directionally drill to 11,050' MD. - 2.5/2.6 bpm @ 3500 psi. FS 3100 psi - 33K Up wt - 16K Dn wt - ROP 100 02:00 - 02:50 0.83 DRILL P PROD1 Wiper to 9300' ( 60 degree inclination). Tie in 02:50 - 03:22 0.53 DRILL P PROD1 Tie -in at RA Correction -4 03:22 - 03:30 0.13 DRILL P PROD1 Continue POH to 9300. Clean trip POH. Printed: 4/1/2005 11:12:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 15-08 15-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 2/20/2005 Rig Release: 3/3/2005 Rig Number: 1 Spud Date: 9/16/1984 End: 2/27/2005 03:30 " 04:30 1.00 DRILL P PROD1 Complete Wiper. No problems. 04:30 - 06:00 1.50 DRILL P PROD1 Directionally drill to 11200 'MD. " 2.5/2.6 bpm @ 3900 psi. FS 3100 psi - 33K Up wt " 16K Dn wt " ROP 120 06:00 - 08:00 2.00 DRILL P PROD1 Wiper trip to window. 08:00 - 09:30 1.50 DRILL P PROD1 Directionally drill to 11,266' MD. - 2.7/2.8 bpm @ 3700 psi. FS 3200 psi - 34K Up wt - 12K Dn wt - ROP 120 09:30 - 09:45 0.25 DRILL P PROD1 Orient to 90R. 09:45 - 10:46 1.02 DRILL P PROD1 Directionally drill to 11,319' MD. - 2.7/2.8 bpm @ 3700 psi. FS 3200 psi - 34K Up wt - 12K Dn wt - ROP 120 - Sticky picking up off bottom (5-1 Ok overpull) 10:46" 12:00 1.23 DRILL P PROD1 Wiper trip to the window - Having a hard time making hole. 12:00 - 12:30 0.50 DRILL P PROD1 Orient TF 130 R 12:30 - 14:15 1.75 DRILL P PROD1 Directionally drill 11452' MD. "2.7/2.8 bpm @ 3700 psi. FS 3200 psi - 34K Up wt - 12K Dn wt - ROP 120 14:15 - 16:00 1.75 DRILL P PROD1 Wiper trip to window. - Overpull at 11,260' MD Tie in to RA tag. " +3' correction. Wipe back to bottom. - No hole problems on trip back in. 16:00 " 16:25 0.42 DRILL P PROD1 Orient TF to 80 R 16:25 - 17:45 1.33 DRILL P PROD1 Directionallydrill11,515' MD. - 2.7/2.8 bpm @ 3700 psi. FS 3200 psi " 35K Up wt - 11 K Dn wt - Difficulty making hole, stacking weight. 17:45 - 18:15 0.50 DRILL P PROD1 Make 500' wiper trip to clean hole. 18:15" 19:15 1.00 DRILL P PROD1 Directionally drill 11552'. - 2.7/2.8 bpm @ 3700 psi. FS 3200 psi - 35K Up wt - 10K Dn wt 19:15" 20:15 1.00 DRILL P PROD1 Wiper to window. Swapping to new mud. Trouble free trip. 20:15" 22:15 2.00 DRILL P PROD1 Directionally drill to 11,700'. "2.5/2.6 bpm @ 3700 psi. FS 3100 psi - 35K Up wt - 10K Dn wt 22:15 - 23:45 1.50 DRILL P PROD1 Wiper to window. Set down once at 11550 then went right thru. Rest of trip clean. 23:45 - 00:00 0.25 DRILL P PROD1 Orient to 96L 2/28/2005 00:00 " 01 :30 1.50 DRILL P i PROD1 Directionally drill to 11,875. Printed: 4/1/2005 11:12:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 15-08 15-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 2/20/2005 Rig Release: 3/3/2005 Rig Number: 1 Spud Date: 9/16/1984 End: 2/28/2005 00:00 - 01 :30 1.50 DRILL P PROD1 - 2.5/2.6 bpm @ 3700 psi. FS 3350 psi - 35K Up wt - 10K Dn wt 01 :30 - 03:00 1.50 DRILL P PROD1 Wiper to window. Set down at 11161.Pop thru. Bobble at 11550 took 3K.Pop thru. 03:00 . 04:00 1.00 DRILL P PROD1 Directionally drill to 12004' - 2.5/2.6 bpm @ 3800 psi. FS 3350 psi - 35K Up wt - 10K Dn wt - ROP 150-200 - minus 10K surface wt. Stacking making short wipers. Lot of reactive torque 04:00 - 08:00 4.00 DRILL N STUC PROD1 Stuck @ 11980 92K full returns. Orienter functioning. Call for crude. Circulate bottoms up. - Attempt shutting pumps off, going to neutral weight, wait 15 min. PU. Stuck. - Bring pumps back on line to 2.7 bpm to prevent pipe from freezing (-21 deg F). 08:00 - 09:00 1.00 DRILL N STUC PROD1 Crude truck arrives on location. Vapor test, ok. Circulate 10 bbls crude down hole at 2.7/2.8 bpm 3400 psi. Pump 2 bbls outside bit. Shut down pumps. Pipe at neutral weight. Attempt to pull free. Pump occassionally to expose new crude to backside. With 8 bbls crude out, work a couple of times. PU max wt and hold. Pull free. 09:00 - 11 :00 2.00 DRILL P PROD1 Wiper trip to 9300' MD. - 2.4/ 2.35 bpm, 3000 psi, 25 fpm. - POOH slick in OH. 11 :00·12:00 1.00 DRILL P PROD1 SLB mechanic to conduct injector brake maintenance. - Bit inside casing. - Pumping 1 bpm, 1400 psi. 12:00 - 13:30 1.50 DRILL P PROD1 Continue wiper trip. - Tie in to RA tag. Correct + 16 feet. - RIH to TD, 5k stack up at 11,550' MD. 13:30 - 14:00 0.50 DRILL P PROD1 Orient TF to 100 L 14:00·16:00 2.00 DRILL P PROD1 Directionally drill to 12150' MD. - 2.5/2.6 bpm @ 3700 psi. FS 3200 psi - 35K Up wt - 10K Dn wt - ROP 150 - minus 4-10K surface wt. - making short wiper trips as needed. 16:00 - 18:00 2.00 DRILL P PROD1 Wiper trip to window. - POOH, 6k overpull at 11,560' MD. . RIH, motor work at 11,560' MD - 10K Dn wt 18:00 - 22:30 4.50 DRILL P PROD1 Directionally drill to 12315' MD. - 2.5/2.6 bpm @ 3700 psi. FS 3200 psi - 35K Up wt - 10K Dn wt Printed: 4/1/2005 11:12:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 15-08 15-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 2/20/2005 Rig Release: 3/3/2005 Rig Number: 1 Spud Date: 9/16/1984 End: 2/28/2005 18:00 - 22:30 4.50 DRILL P PROD1 - ROP 170 - minus 4-10K surface wt. - making short wiper trips as needed. 22:30 - 00:00 1.50 DRILL P PROD1 Wiper to window. 3/1/2005 00:00 - 00:40 0.67 DRILL P PROD1 Tie-in log correction. +6'. 00:40 - 01 :30 0.83 DRILL P PROD1 Continue wiper to TD. Tag TD @ 12317'. 01 :30 - 01 :50 0.33 DRILL P PROD1 Spot liner pill and POH. 01 :50 - 02:00 0.17 DRILL N STUC PROD1 STUCK at 11998. Packed off. Can't move down or up . Pressure backside to 350 psi. RIH broke free. 02:00 - 06:00 4.00 DRILL P PROD1 Regain full circulation. Work shale at 12000'. POH @ 2.7 bpm. thru shale at 11500. Ratty at 11575' and 11525. Continue wiper to 10800. RIH Set down 11538. RIH to TD no problem. POH to 9300.while waiting on pill. Ratty at 12210. Continiue to POH. Over pull and packing off at 11510. Continue POH window. 06:00 - 06:10 0.17 DRILL P PROD1 Tie - in correction + 1.5' 06:10 - 07:00 0.83 DRILL P PROD1 Wiper trip back to TD. - Took 10k down weight at 11,550' MD 07:00 - 08:00 1.00 DRILL P PROD1 POOH, laying in liner running pill - Overpull (15-20k) at 12,000' MD. - Overpull (15-20k) at 11,575 - 11,525' MD. Minimal packing off. 08:00 - 10:00 2.00 DRILL P PROD1 POOH. Pumping at 2.5 bpm, 3200 psi, 75-100 fpm, ensuring hole is clean. - Flag painted at 10,035' EOP 10:00 - 11 :00 1.00 DRILL P PROD1 LD BHA. 11 :00 - 11 :20 0.33 CASE P RUNPRD Safety Meeting for running liner. 11 :20 - 14:30 3.17 CASE P RUNPRD MU and run liner as per tally. 14:30 - 16:00 1.50 CASE P RUNPRD RIH with liner 69 joints 2-7/8 STL with 5 jt inner string of 1-1/4" CSH and memory CCL 1 GR. RIH circulating .4 bpm at 1000 psi. at 90 fpm. RIH 9900 Wt check Up Wt 44K. Dn Wt 20K. 16:00 - 16:45 0.75 CASE P RUNPRD Run in Open hole. .4 bpm at 1300 psi 70 fpm. Set dowm 11500., 11750, 11800. RIH to flag. No problem. +6 to -6 K surface wt. 16:45 - 17:40 0.92 CASE P RUNPRD Drop 5/8" delron ball. Displace ball 1.75 bpm at 2000 psi. Ball on seat with 49 bbl actual calculated 58.7 bbl. Shear at 2400 psi. Pu off liner 17:40 - 18:40 1.00 EVAL P LOWER1 Log up to 8400 @ 30 fpm with memory CCL 1 GR. 18:40 - 20:00 1.33 EVAL P LOWER1 POOH with CTLRT and MGR/CCL 20:00 - 21 :00 1.00 EVAL P LOWER1 LD CTLRT and 5 jts 1-1/4" CSH and SLB MCCUGR. Checked data TOL at 10,047ft in 50 API sand and bottom of liner at 12,189 ft (18 ft deeper than Liner Summary Tally and 25 ft below bottom of WS at 10022 ft). Liner fell down hole during release operations. 21 :00 - 21 :30 0.50 EV AL P LOWER1 SLB checking on Injectorbrake head hydraulic system 21 :30 - 22:00 0.50 EV AL P LOWER1 Cut off 100 ft CT for pipe management 22:00 - 22:45 0.75 EVAL P LOWER1 Install CTC, pull tested to 40k and pressure tested to 3500 psi 22:45 - 23:00 0.25 EV AL P LOWER1 PJSM on handling WFT fishing BHA 23:00 - 23:45 0.75 EVAL P LOWER1 PU WFT Fishing BHA, repair little jerk hydraulic fitting 23:45 - 00:00 0.25 EV AL P LOWER1 RIH with Fishing BHA 3/2/2005 00:00 - 01 :45 1.75 EVAL P LOWER1 RIH with WFT Fishing BHA WT check at 9900 ft = 32k 01 :45 - 01 :53 0.13 EVAL P LOWER1 Worked over WS at 1.0 bpm, stalled, jarred down to set box Printed: 4/1/2005 11:12:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 15-08 15-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 2/20/2005 Rig Release: 3/3/2005 Rig Number: 1 Spud Date: 9/16/1984 End: 3/212005 01 :45 - 01 :53 0.13 EVAL P LOWER1 tap, jarring to release. Jarred 5 times starting at 10k over working up to 30k over string wt, jarred lose, PUH dragging 10k for 30 ft 01 :53 - 03:45 1.87 EVAL P LOWER1 PUH, closed in well, fill backside and maintaining 100-200 psi on wellhead while POOH. 03:45 - 05:30 1.75 EVAL P LOWER1 OOH, check for flow. Stand back fishing BHA. Recovered WS w/ spacer jt and stinger, remove pip tags. PU packer retrieving tool 05:30 - 07:30 2.00 FISH P DECOMP RIH with packer retrieving tool 07:30 - 07:40 0.17 FISH P DECOMP Jar packer free with 8 licks. PU wt 33K Jarred 6 licks 20K over and 2 30K over. 07:40 - 08:40 1.00 FISH P DECOMP Circulate bottoms up with FloPro. No gas on bottoms up. Swap to KCL circulate to nozzel at 3 bpm at 3050 psi. 08:40 - 10:20 1.67 FISH P DECOMP POH. No over pulls off bottom. 10:20 - 11 :00 0.67 FISH P DECOMP LD BHA NO FISH. 11 :00 - 11 :45 0.75 FISH P DECOMP Redress packer retrieving tool. 11 :45 - 12:00 0.25 FISH P DECOMP MU Packer retrieving tool #2. 12:00 - 13:45 1.75 FISH P DECOMP RIH 13:45 - 15:30 1.75 FISH P DECOMP Up Wt 33K. Latch fish no problem. Commence jarring down and up gradualling increasing intensity to max down and 30 over up. Without success. Pulled straight released with 75K. Wait for packer to relax. RIH set down 10,092 ft POH but seeing some drag over. 15:30 - 17:30 2.00 FISH P DECOMP POH. No Fish. 17:30 - 17:45 0.25 FISH P DECOMP LD fishing BHA. Pu Nozzle. 17:45 - 19:00 1.25 WHSUR P POST RIH to 2500 ft to freeze protect. 19:00 - 19:45 0.75 WHSUR P POST POOH laying in MEOH 19:45 - 20:00 0.25 WHSUR P POST OOH, close MV, PJSM on N2 blow down 20:00 - 21:15 1.25 WHSUR P POST Blow CT down with N2 21:15 - 00:00 2.75 DEMOS P POST Clean pits, pull CT to reel house, change out SOP rams to 2" Ct 3/3/2005 00:00 - 04:15 4.25 DEMOB P POST Securing CT to reel prior to reel swap. Using hydraulic porta-power to jack out reel pins. Changing out Kill side check valve. RD Tiger tank. 04:15 - 04:45 0.50 DEMOS P POST SAFETY MEETING on Reel swap with Peak, Nordic and SLB. Midigation of hazards concerning making reel lifts 04:45 - 05:30 0.75 DEMOS P POST Finished installing kill line check valve Conducted reel swap 05:30 - 06:00 0.50 DEMOS P POST Set injector on stands ND SOP's and hang for mobilization 06:00 - 08:25 2.42 DEMOS P POST Make Ready to move off well SAFETY MEETING on moving off well 08:25 - 08:30 0.08 DEMOS P POST RIG RELEASED AT 0830 hrs 3/3/2005 Printed: 4/1/2005 11:12:11 AM . ~ ~ In ~ CI) .!!! ~ ,... Cb~~ Q.. ~ co ..2 Q (J)tQ~ 4: ,... t ~ :g I::) C\ ~ a:s 2 .Q at ~ i:i ~ ~ ~ ~- C\ I ~ ~ q: ~ ~ 1:: Q 2- ct: ~ ~ a.... :::J C/) g C\ -'" 'ï::: Q" q: ~ ~ è') m co g è') ~~ CIOQ) ~r:: ,.. 0 ;;::- ~ . æ ~r:: ~.!!! "'Q" I::)~.!!! co· S ~~CI) ,.. 0 a:s ~~~ OI'-a:s ~ILI~ ~"" _CI ~ Q",...... q:~~ .;.: J:::: '. ~coi 5ë:~ o ,.. CI):.o. >.1::) a).!!! ~a:s Q) .5; It)~ mo ¡,¡8 .!!!~ C\1 "i: .5; U ~ o 8 Q) (,) ~ :;, CI) . ,.. ,.. It) }. II) ~ ~ ~ 1! Q) ..... a:s ~ j ~ o i ;::: Q) Q) ....: It) è: .S! ~ .!!! ILl tJ) r:: ~ ~ IXI ~ ~ r-, · ',In ~ L.. 'w [ Jm U ~ _0 1ft >, I., g 'I:: I" .11:." ,,:~ L « c.: OJJ n.~ Ift~ BPXA Survey Report for 15-08CL 1 Your Ref: API 500292118060 Job No. AKMW0003560124, Surveyed: 28 February, 2005 North Slope Alaska BPXA Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9947.43 88.420 309.080 8751.30 8809.29 2092.89 N 507.92 E 5961973.30 N 677779.67 E -2129.19 Tie On Point 9983.12 88.240 304.930 8752.34 8810.33 2114.35 N 479.43 E 5961994.09 N 677750.69 E 11.634 -2148.09 10016.00 88.290 304.410 8753.33 8811.32 2133.05 N 452.41 E 5962012.14 N 677723.23 E 1.588 -2164.36 Window Point 10051.48 90.090 296.890 8753.84 8811.83 2151.12 N 421.91 E 5962029.49 N 677692.31 E 21.791 -2179.71 10086.11 91.490 289.550 8753.36 8811.35 2164.76 N 390.11 E 5962042.37 N 677660.20 E 21.575 -2190.53 10116.90 89.780 283.020 8753.02 8811.01 2173.39 N 360.57 E 5962050.30 N 677630.47 E 21.921 -2196.55 . 10150.07 87.980 277.350 8753.67 8811.66 2179.25 N 327.95 E 5962055.39 N 677597.71 E 17.931 -2199.54 10181.36 90.700 271 .730 8754.03 8812.02 2181.73 N 296.77 E 5962057.13 N 677566.49 E 19.951 -2199.29 10214.67 90.260 265.930 8753.75 8811.74 2181.05 N 263.48 E 5962055.67 N 677533.22 E 17.462 -2195.71 10249.54 91.580 259.070 8753.19 8811.18 2176.50 N 228.94 E 5962050.31 N 677498.80 E 20.031 -2188.17 10280.02 91 .670 252.920 8752.32 8810.31 2169.13 N 199.39 E 5962042.24 N 677469.43 E 20.171 -2178.25 10320.70 94.390 244.300 8750.17 8808.16 2154.33 N 161.60E 5962026.56 N 677432.00 E 22.189 -2160.22 10350.22 91.320 240.090 8748.70 8806.69 2140.58 N 135.53 E 5962012.20 N 677406.26 E 17.635 -2144.25 10380.93 87.010 233.760 8749.14 8807.13 2123.84 N 109.82 E 5961994.85 N 677380.95 E 24.931 -2125.33 10411.23 85.960 229.010 8751.00 8808.99 2104.97 N 86.20 E 5961975.43 N 677357.78 E 16.026 -2104.47 10444.69 91.230 224.620 8751.82 8809.81 2082.09 N 61.82 E 5961951.98 N 677333.95 E 20.493 -2079.56 10474.01 89.030 219.340 8751.76 8809.75 2060.31 N 42.22 E 5961929.74 N 677314.87 E 19.508 -2056.15 10506.28 88.680 219.170 8752.40 8810.39 2035.32 N 21.81 E 5961904.28 N 677295.05 E 1.206 -2029.48 10536.40 87.360 215.300 8753.44 8811.43 2011.36 N 3.59 E 5961879.90 N 677277.41 E 13.568 -2004.02 10569.22 86.750 209.850 8755.13 8813.12 1983.75 N 14.05 W 5961851.88 N 677260.43 E 16.688 -1974.98 10599.08 90.260 204.930 8755.91 8813.90 1957.26 N 27.77 W 5961825.07 N 677247.33 E 20.234 -1947.39 10644.37 90.970 199.130 8755.42 8813.41 1915.30N 44.75 W 5961782.72 N 677231.35 E 12.901 -1904.11 10682.18 86.570 193.680 8756.23 8814.22 1879.06 N 55.42 W 5961746.24 N 677221.53 E 18.520 -1867.08 . 10714.67 84.370 188.230 8758.80 8816.79 1847.28 N 61.58 W 5961714.32 N 677216.13 E 18.040 -1834.88 10748.82 84.460 183.310 8762.13 8820.12 1813.47 N 64.99 W 5961680.44 N 677213.51 E 14.341 -1800.91 10799.49 84.810 176.280 8766.87 8824.86 1763.05 N 64.81 W 5961630.05 N 677214.88 E 13.830 -1750.70 10828.33 87.010 172.230 8768.93 8826.92 1734.44 N 61.93 W 5961601.51 N 677218.44 E 15.949 -1722.44 10885.20 89.650 163.800 8770.59 8828.58 1678.89 N 50.13 W 5961546.25 N 677231.54 E 15.526 -1668.13 10920.86 88.940 155.710 8771.03 8829.02 1645.46 N 37.81 W 5961513.12 N 677244.65 E 22.772 -1635.91 10953.67 90.090 152.900 8771.31 8829.30 1615.90N 23.58 W 5961483.91 N 677259.57 E 9.254 -1607.70 10994.06 91.320 144.990 8770.81 8828.80 1581.33N 2.77W 5961449.84 N 677281.20 E 19.818 -1575.07 11024.45 90.970 139.360 8770.20 8828.19 1557.34 N 15.86 E 5961426.29 N 677300.38 E 18.558 -1552.80 11065.21 86.040 134.260 8771.27 8829.26 1527.65 N 43.73 E 5961397.27 N 677328.94 E 17.397 -1525.65 11112.55 85.600 126.880 8774.72 8832.71 1496.97 N 79.57 E 5961367.44 N 677365.50 E 15.576 -1498.20 11144.27 89.380 124.770 8776.11 8834.10 1478.42 N 105.25 E 5961349.50 N 677391.62 E 13.644 -1481.97 4 April, 2005 - 14:25 Page 2 of 4 DrillQuest 3.03.06.008 BPXA Survey Report for 15-08CL 1 Your Ref: API 500292118060 Job No. AKMW0003560124, Surveyed: 28 February, 2005 North Slope Alaska BPXA Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft) 11174.14 93.430 128.290 8775.38 8833.37 1460.65 N 129.24 E 5961332.31 N 677416.01 E 17.960 -1466.36 11219.00 93.430 131.800 8772.69 8830.68 1431.85 N 163.52 E 5961304.32 N 677450.96 E 7.810 -1440.65 11266.67 91.050 136.200 8770.83 8828.82 1398.77 N 197.77 E 5961272.06 N 677485.98 E 10.487 -1410.68 11297.58 92.640 140.770 8769.83 8827.82 1375.64 N 218.24 E 5961249.42 N 677506.99 E 15.646 -1389.43 11330.69 91 .490 141.470 8768.64 8826.63 1349.89 N 239.01 E 5961224.16 N 677528.37 E 4.065 -1365.58 11360.69 91.410 143.930 8767.88 8825.87 1326.03 N 257.18 E 5961200.74 N 677547.10 E 8.202 -1343.40 . 11391.02 92.370 152.370 8766.88 8824.87 1300.31 N 273.16 E 5961175.40 N 677563.68 E 27.991 -1319.17 11431.70 91.230 160.630 8765.60 8823.59 1263.05 N 289.36 E 5961138.54 N 677580.75 E 20.487 -1283.46 11468.10 91.490 160.630 8764.73 8822.72 1228.72 N 301.43 E 5961104.50 N 677593.63 E 0.714 -1250.32 11498.74 93.600 164.150 8763.37 8821.36 1199.55 N 310.69 E 5961075.56 N 677603.57 E 13.384 -1222.07 11530.50 92.460 168.010 8761.69 8819.68 1168.77 N 318.32 E 5961044.97 N 677611.92 E 12.656 -1192.07 11583.49 89.300 177. 680 8760.88 8818.87 1116.27 N 324.91 E 5960992.64 N 677619.75 E 19.194 -1140.34 11633.22 87.540 174.340 8762.25 8820.24 1066.69 N 328.36 E 5960943.15 N 677624.38 E 7.589 -1091.25 11671.68 91.230 179.090 8762.66 8820.65 1028.31 N 330.57 E 5960904.84 N 677627.48 E 15.637 -1053.21 11722.52 93.950 183.310 8760.36 8818.35 977.55 N 329.51 E 5960854.06 N 677627.62 E 9.868 -1002.55 11753.10 92.900 178.030 8758.54 8816.53 947.04 N 329.15 E 5960823.55 N 677627.98 E 17.574 -972.12 11783.70 91.580 178.030 8757.34 8815.33 916.48 N 330.20 E 5960793.03 N 677629.76 E 4.314 -941.77 11835.00 88.330 173.990 8757.38 8815.37 865.32 N 333.77 E 5960741.97 N 677634.53 E 10.106 -891.12 11877 .19 87.010 171.880 8759.10 8817.09 823.49 N 338.95 E 5960700.27 N 677640.70 E 5.896 -849.90 11907.74 87.270 167.660 8760.62 8818.61 793.47 N 344.37 E 5960670.39 N 677646.82 E 13.822 -820.47 11950.67 92.680 181.050 8760.64 8818.63 750.86 N 348.58 E 5960627.89 N 677652.04 E 33.629 -778.39 11993.34 92.640 184.360 8758.66 8816.65 708.29 N 346.57 E 5960585.28 N 677651.03 E 7.749 -735.80 12032.44 91.580 179.090 8757.22 8815.21 669.25 N 345.40 E 5960546.22 N 677650.78 E 13.739 -696.81 . 12064.72 88.420 179.090 8757.22 8815.21 636.98 N 345.91 E 5960513.97 N 677652.05 E 9.789 -664.70 12099.42 86.750 170.650 8758.68 8816.67 602.48 N 349.00 E 5960479.56 N 677655.96 E 24.772 -630.61 12134.62 89.210 169.950 8759.92 8817.91 567.81 N 354.93 E 5960445.04 N 677662.71 E 7.266 -596.58 12171.69 91.050 166.610 8759.84 8817.83 531.52 N 362.46 E 5960408.93 N 677671.09 E 10.286 -561.09 12203.12 88.420 161.510 8759.99 8817.98 501.31 N 371.09 E 5960378.94 N 677680.43 E 18.256 -531.75 12258.52 87.710 164.500 8761.86 8819.85 448.37 N 387.27 E 5960326.39 N 677697.85 E 5.544 -480.41 12291.30 84.550 162.040 8764.07 8822.06 417.05 N 396.68 E 5960295.30 N 677708.00 E 12.206 -450.04 12317.00 84.550 162.040 8766.51 8824.50 392.71 N 404.57 E 5960271 .16 N 677716.46 E 0.000 -426.48 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). 4 April, 2005 - 14:25 Page 3 of 4 DrillQuest 3.03.06.008 BPXA Survey Report fòr 15-08CL 1 Your Ref: API 500292118060 Job No. AKMW0003560124, Surveyed: 28 February, 2005 North Slope Alaska BPXA Vertical Section is from Well Reference and calculated along an Azimuth of 185.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12317.00ft., The Bottom Hole Displacement is 563.83ft., in the Direction of 45.852° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment . 9947.43 10016.00 12317.00 8809.29 8811.32 8824.50 2092.89 N 2133.05 N 392.71 N 507.92 E 452.41 E 404.57 E Tie On Point Window Point Projected Survey Survey tool program for 15-0BCL 1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 7398.00 0.00 7398.00 7158.13 12317.00 7158.13 BP High Accuracy Gyro (15-08) 8824.50 MWD Magnetic (15-08APB1) . 4 April, 2005 - 14:25 Page 4 of 4 DrillQuest 3.03.06.008 TREE = WELLHEAD = ACTUA TOR = KB. ELEV = BF. ELEV = KOP= II.1ax Angle = Datum MD = Datum TVD = . FMC GEN 3 FMC AXELSON 57.99' 15-0f~C L 1 Proposed CTD Sidetrack 5800' 94 @ 10695' N/A 8800' SS 113-3/8" CSG, 72#, L-80, ID = 12.347" 1-1 TOPOF 7" SCAB LNR, 26#, L-80 1-1 ~ I J 2539' 2640' l L BTM OF 7" SCAB LNR, 26#, L-80 1-1 7265' 19-5/8" CSG, 47#, L-80, ID = 8.681" H 7448' Minimum IC = 3.725" @ 8590' 4-1/2" HES XN NIPPLE (milled to 3.8") 8 ~ 14-112" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958"1-1 8602' ~ I r ÆRFORA TION SUMMARY REF LOG: ANGLE AT TOP ÆRF: 88@9940' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 2-1/2" 4 9940 - 9980 0 08/08/03 2-1/2" 4 1 0000 - 1 0050 0 08/08/03 2-1/2" 4 1 0070 - 1 0230 0 08/08/03 2-1/2" 4 1 0290 - 1 0400 0 08/08/03 2-1/2" 4 10510 - 10570 0 08/08/03 2-1/2" 4 10720 - 10840 0 08/08/03 2-1/2" 4 1 0900 - 11430 0 08/08/03 17" HES EZSV 1-1 8790' 17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" 1-1 9825' I TD H 12627' SA~ES: *** 7" CHROME LNR; 4-1/2" cí·iRO~8G *** FROM DRLG - DRAFT I ~ 2207' 1-14-1/2"HESXNIP,ID=3.813" I ST MD TVD 4 3291 3291 3 5590 5590 2 7600 7292 1 8457 8073 GAS LIFT MANDRELS DEV TYÆ VLV LATCH o KBG-2 LGVL BK 3 KBG-2 SO BK 42 KBG-2 DMY BK 21 KBG-2 DMY BK PORT DATE 16 03/05/05 20 03/05/05 o 08/1 0/03 o 08/1 0/03 1 I I 8525' H4-1/2" HES X NIP, ID = 3.813" I 8546' H 7" X 4-112" BKR S-3 A<R ID = 3.875" I 8570' H4-1/2" HES X NIP, ID = 3.813" I 8590' 1-14-1/2" HES XN NIP, ID = 3.725" I milled out to 3.S" 8600' H 7" X 4-1/2" BKR ZXP LNR TOP A<R 8602' 1-i4-1/2" WLEG, ID = 3.958" I H ELMD TT NOT LOGGED I I MILLOUT WINDOW 8772' - 8780' 10029' -iTOP of 2-7/8" liner / 10047' -1fromMCCLlGR / I Drilled 3-3/4" Hole to 12317 ft 1 t::'- 000000 2-7/8" L-80 Pre-drilled Liner I 12170' Liner landed f/ MCCL/GR 12189' TIW WS-R-BB Ret Packer 10,065 ft 10=2.063" ~ 14-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 1-1 11551' DATE 1984 10/21/93 11/22/97 08/11/03 08/15/03 02/04/04 REV BY COMMENTS ORIGINAL COM PLETION SIDETRACK (1S-0SA) SIDETRACK (1S-08B) JDM/KK RIG SIDETRACK (1S-08C) RWL/KK GL V C/O CMOITLP ÆRF ANGLE CORRECTION DATE REV BY COMMENTS 03/03/0S DLHlBL CTD Sidetrack (1S-08CL 1) 03/06/05 MGS/TLH GL V C/O PRUDHOE BA Y UNIT WELL: 15-08C ÆRMIT No: 2031210 API No: 50-029-21180-03 SEC 22, T11 N, R14E, 4050.67' FEL & 3719.98' FNL BP Exploration (Alaska) . . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well 15-08C L 1 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 9,947.43' MD 10,016.00' MD 12,317.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Signed JL¡ rtL~ Date ;( 7 f1pJJrtJr Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) 23-Apr-05 }¡ cJ Y-- -do> ~- ~ 'ObP · Baker Hughes INTEQ . Baker Hughes INTEQ Survey Report .¡¡. BAKU HUGHH LNTEQ Company: Field: Site: Well: Wellpath: BP·Amoco Prudhoe Bay PB DS 15 15-08 15-08CL1 Date: 3/23/2005 Time: 10:30:16 Page: Co-ordinate(NE) Reterence: Well: 15-08, True North Vertical (TVD) Reference: 57.99' .58.0 Section (VS)Reference: Well (0.QON,0.ooE,185.00Azi) Snrvey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre bggm2004 Site: PB DS 15 TR-11-14 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5958837.36 ft 676296.98 ft Latitude: 70 17 Longitude: 148 34 North Reference: Grid Convergence: 35.236 N 21.213 W True 1.34 deg 15-08 15-08 Well Position: Slot Name: Well: +N/-S 1007.41 ft +E/-W 1048.27 ft Position Uncertainty: 0.00 ft Northing: ~;asting : 5959869.01 ft 677321.27 ft Latitude: Longitude: 70 17 45.144 N 148 33 50.659 W +N/-S ft 0.00 Dritled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angte: +E/-W ft 0.00 15-08C 10016.00 ft Mean Sea Level 24.99 deg 80.86 deg Direction deg 185.00 Wellpath: 15-08CL 1 500292118060 Current Datum: 57.99' Magnetic Data: 1/6/2005 Field Strength: 57632 nT Vertical Section: Depth From (TVD) ft 26.99 Height 57.99 ft Survey Program for Definitive Well path Date: 3/4/2005 Validated: Yes Actual From To Survey ft ft 28.99 7386.99 7455.06 8761.90 8772.00 9983.12 10016.00 12291.30 Version: Toolcode 3 Tool Name Sperry-Sun BOSS gyro multi (28.99-9386.9!1)<¡x.'I}S-GYRO MWD (7455.06-9805.06) (1) MWD MWD (8772.00-11501.88) (S) MWD MWD (10016.00-12291.30) MWD Sperry-Sun BOSS gyro multishot MWD - Standard MWD - Standard MWD - Standard Annotation MD ft 9947.43 10016.00 10051.48 10086.11 12317.00 TVD ft 8808.24 8810.27 8810.78 8810.30 0.00 TIP KOP Interpolated Azimuth Interpolated Azimuth Projected TD Survey: MWD Start Date: 2/25/2005 Company: Halliburton Tool: MWD;MWD - Standard Engineer: Tied-to: BakerHugheslNTEQ From: Definitive Path )0 )-- a ()) "'ObP · Baker Hughes INTEQ . -¡¡. BAKm HUGIIIS Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: .3/23/2005 Time: 10:30:16 Page: 2 Field: Prudhoe Bay Co-ôrdinate(NE) Reference: Well: 15-08, True North Site: PB DS 15 Vertical (TVD) Refertjnce: 57.99' 58.0 Well: 15'()8 section (VS) Reference: Well (0.00N,O.00E,185,OOAzi) Wellpath: 15-08CL 1 Survey Caltulation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deQ/10Oft 9983.12 88.24 304.93 8809.28 8751.29 2114.99 480.42 5961994.61 677751.63 -2148.82 0.00 MWD 10016.00 88.29 304.41 8810.27 8752.28 2133.69 453.40 5962012.66 677724.17 -2165.09 1.59 MWD 10051.48 90.09 296.89 8810.78 8752.79 2151.76 422.90 5962030.01 677693.26 -2180.43 21.79 MWD 10086.11 91.49 289.55 8810.30 8752.31 2165.40 391.10 5962042.90 677661.15 -2191.25 21.58 MWD 10116.90 89.78 283.02 8809.96 8751.97 2174.03 361.56 5962050.83 677631.42 -2197.27 21.92 MWD 10150.07 87.98 277.35 8810.60 8752.61 2179.89 328.94 5962055.92 677598.67 -2200.27 17.93 MWD 10181.36 90.70 271.73 8810.97 8752.98 2182.37 297.76 5962057.65 677567.44 -2200.01 19.95 MWD 10214.67 90.26 265.93 8810.69 8752.70 2181.69 264.47 5962056.19 677534.18 -2196.44 17 .46 MWD 10249.54 91.58 259.07 8810.13 8752.14 2177.14 229.93 5962050.83 677499.76 -2188.90 20.03 MWD 10280.02 91.67 252.92 8809.26 8751.27 2169.77 200.38 5962042.76 677470.39 -2178.98 20.17 MWD 10320.70 94.39 244.30 8807.11 8749.12 2154.97 162.59 5962027.08 677432.97 -2160.94 22.19 MWD 10350.22 91.32 240.09 8805.64 8747.65 2141.22 136.52 5962012.72 677407.23 -2144.97 17.63 MWD 10380.93 87.01 233.76 8806.08 8748.09 2124.48 110.81 5961995.38 677381.92 -2126.05 24.93 MWD 10411.23 85.96 229.01 8807.94 8749.95 2105.61 87.19 5961975.96 677358.75 -2105.20 16.03 MWD 10444.69 91.23 224.62 8808.76 8750.77 2082.73 62.81 5961952.51 677334.93 -2080.28 20.49 MWD 10474.01 89.03 219.34 8808.70 8750.71 2060.95 43.21 5961930.27 677315.85 -2056.87 19.51 MWD 10506.28 88.68 219.17 8809.34 8751.35 2035.96 22.80 5961904.81 677296.03 -2030.20 1.21 MWD 10536.40 87.36 215.30 8810.38 8752.39 2012.00 4.58 5961880.43 677278.39 -2004.75 13.57 MWD 10569.22 86.75 209.85 8812.07 8754.08 1984.39 -13.06 5961852.41 677261.40 -1975.70 16.69 MWD 10599.08 90.26 204.93 8812.85 8754.86 1957.90 -26.78 5961825.61 677248.31 -1948.12 20.23 MWD 10644.37 90.97 199.13 8812.36 8754.37 1915.94 -43.76 5961783.26 677232.32 -1904.83 12.90 MWD 10682.18 86.57 193.68 8813.17 8755.18 1879.70 -54.43 5961746.78 677222.51 -1867.80 18.52 MWD 10714.67 84.37 188.23 8815.74 8757.75 1847.92 -60.59 5961714.86 677217.11 -1835.60 18.04 MWD 10748.82 84.46 183.31 8819.07 8761.08 1814.11 -64.00 5961680.99 677214.49 -1801.63 14.34 MWD 10799.49 84.81 176.28 8823.81 8765.82 1763.69 -63.82 5961630.59 677215.86 -1751.42 13.83 MWD 10828.33 87.01 172.23 8825.87 8767.88 1735.08 -60.94 5961602.06 677219.42 -1723.17 15.95 MWD 10885.20 89.65 163.80 8827.53 8769.54 1679.53 -49.15 5961546.80 677232.52 -1668.86 15.53 MWD 10920.86 88.94 155.71 8827.97 8769.98 1646.10 -36.82 5961513.68 677245.63 -1636.63 22.77 MWD 10953.67 90.09 152.90 8828.25 8770.26 1616.54 -22.59 5961484.47 677260.55 -1608.42 9.25 MWD 10994.06 91.32 144.99 8827.75 8769.76 1581.97 -1.78 5961450.40 677282.17 -1575.80 19.82 MWD 11024.45 90.97 139.36 8827.14 8769.15 1557.98 16.85 5961426.86 677301.36 -1553.52 18.56 MWD 11065.21 86.04 134.26 8828.20 8770.21 1528.29 44.72 5961397.83 677329.92 -1526.37 17 .40 MWD 11112.55 85.60 126.88 8831.66 8773.67 1497.61 80.56 5961368.00 677366.47 -1498.93 15.58 MWD 11144.27 89.38 124.77 8833.05 8775.06 1479.06 106.24 5961350.07 677392.58 -1482.69 13.64 MWD 11174.14 93.43 128.29 8832.32 8774.33 1461.29 130.23 5961332.88 677416.98 -1467.08 17.96 MWD 11219.00 93.43 131.80 8829.63 8771.64 1432.49 164.51 5961304.89 677451.93 -1441.38 7.81 MWD 11266.67 91.05 136.20 8827.77 8769.78 1399.41 198.76 5961272.63 677486.95 -1411.41 10.49 MWD 11297.58 92.64 140.77 8826.77 8768.78 1376.28 219.23 5961249.99 677507.96 -1390.15 15.65 MWD 11330.69 91.49 141.47 8825.58 8767.59 1350.53 240.00 5961224.74 677529.33 -1366.30 4.07 MWD 11360.69 91.41 143.93 8824.82 8766.83 1326.67 258.17 5961201.32 677548.05 -1344.12 8.20 MWD 11391.02 92.37 152.37 8823.82 8765.83 1300.95 274.15 5961175.98 677564.64 -1319.89 27.99 MWD 11431.70 91.23 160.63 8822.54 8764.55 1263.69 290.35 5961139.12 677581.71 -1284.19 20.49 MWD 11468.10 91.49 160.63 8821.67 8763.68 1229.36 302.42 5961105.08 677594.58 -1251.04 0.71 MWD 11498.74 93.60 164.15 8820.31 8762.32 1200.19 311.68 5961076.14 677604.53 -1222.79 13.38 MWD 11530.50 92.46 168.01 8818.63 8760.64 1169.41 319.31 5961045.56 677612.88 -1192.79 12.66 MWD 11583.49 89.30 177.68 8817.82 8759.83 1116.91 325.90 5960993.23 677620.71 -1141.07 19.19 MWD 11633.22 87.54 174.34 8819.19 8761.20 1067.33 329.35 5960943.74 677625.33 -1091.97 7.59 MWD 11671.68 91.23 179.09 8819.60 8761.61 1028.95 331.56 5960905.43 677628.44 -1053.93 15.64 MWD 11722.52 93.95 183.31 8817.30 8759.31 978.19 330.50 5960854.66 677628.57 -1003.27 9.87 MWD 11753.10 92.90 178.03 8815.48 8757.49 947.68 330.14 5960824.15 677628.94 -972.85 17.57 MWD 11783.70 91.58 178.03 8814.28 8756.29 917.12 331.19 5960793.63 677630.71 -942.50 4.31 MWD 11835.00 88.33 173.99 8814.32 8756.33 865.96 334.76 5960742.58 677635.48 -891.85 10.11 MWD 11877.19 87.01 171.88 8816.04 8758.05 824.13 339.94 5960700.88 677641.65 -850.62 5.90 MWD . . Bia. .. "ObP Baker Hughes INTEQ IIAJCD HUGHIS Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 3/23/2005 Time: 10:30:16 Page: 3 Field: prudhoe Bay Co-ordinate(NE)Reference: Well: 15-08, True North Site: PB DS 15 Vertical (TVD)Reference: 57.99' 58.0 Well: 15-08 Section (VS)Reference: Well (0.00N,0.00E,185.00Azi) Wellpath: 15-08CL1 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Inel Azim TVD SSTVD N/S E/W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/10Oft 11907.74 87.27 167.66 8817.56 8759.57 794.11 345.36 5960671.00 677647.78 -821.19 13.82 MWD 11950.67 92.68 181.05 8817.58 8759.59 751.50 349.57 5960628.50 677652.99 -779.11 33.63 MWD 11993.34 92.64 184.36 8815.60 8757.61 708.93 347.56 5960585.90 677651.99 -736.53 7.75 MWD 12032.44 91.58 179.09 8814.16 8756.17 669.89 346.39 5960546.84 677651.73 -697.53 13.74 MWD 12064.72 88.42 179.09 8814.16 8756.17 637.62 346.90 5960514.60 677653.01 -665.43 9.79 MWD 12099.42 86.75 170.65 8815.62 8757.63 603.12 349.99 5960480.18 677656.92 -631.33 24.77 MWD 12134.62 89.21 169.95 8816.86 8758.87 568.45 355.92 5960445.66 677663.66 -597.31 7.27 MWD 12171.69 91.05 166.61 8816.78 8758.79 532.16 363.45 5960409.56 677672.04 -561.81 10.29 MWD 12203.12 88.42 161.51 8816.92 8758.93 501.95 372.08 5960379.57 677681.38 -532.47 18.26 MWD 12258.52 87.71 164.51 8818.80 8760.81 449.01 388.25 5960327.02 677698.80 -481.14 5.56 MWD 12291.30 84.55 162.04 8821.01 8763.02 417.69 397.66 5960295.94 677708.94 -450.76 12.22 MWD ". ~~!Æ:E (ill} !Æ~!Æ~~«!Æ . AI',ASIiA OIL AlQ) GAS CONSERVATION COltDllSSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7T" AVENUE, SUITE 1 00 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay 15-08CLl BP Exploration (Alaska) Inc. Permit No: 205-005 Surface Location: 1645' SNL, 1378' EWL, SEe. 22, TIIN, RI4E, UM Bottomhole Location: 1009' SNL, 1721' EWL, SEC. 22, TUN, R14E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to redrill the above development well. The permit is for a new well bore segment of existing well PBU 15-08C, Permit No. 203-121, API No. 50-029-21180-03. Production should continue to be reported as a function of the original API number stated above. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to . ~ess any required test. Contact the Commission's petroleum field inspector at (907 659- 07 (pager). DATED this~day of January, 2005 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environrnental Conservation w/o encl. W G Å; i ( I z. / 2. 00<.; o Drill II Redrill 1 a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1645' SNL, 1378' EWL, SEC. 22, T11N, R14E, UM Top of Productive Horizon: 272' NSL, 2092' EWL, SEC. 15, T11N, R14E, UM Total Depth: 1009' SNL, 1721' EWL, SEC. 22, T11N, R14E, UM . STATE OF ALASKA . ALASKA~L AND GAS CONSERVATION CO"ISSION PERMIT TO DRILL 20 AAC 25.005 Oil & (;;1>: Conô C .. \' . 11 b. Current Well Class 0 Exploratory II Development Oil ~!!iple Žongmn, ~wr' o Stratigraphic Test 0 Service 0 Development Gas r!J1S1IìIW_þne 5. Bond: 181 Blanket 0 Single Well 11. Well Name and Number: Bond No. 2S100302630-277 PBU 15-08CL 1 6. Proposed Depth: 12. Field I Pool(s): MD 12000 TVD 8776ss Prudhoe Bay Field I Prudhoe Bay 7. Property Designation: Pool ADL 028306 JAN 1 0 2005 8. Land Use Permit: 13. Approximate Spud Date: February 8, 2005 14. Distance to Nearest Property: 28,000' 9. Acres in Property: 2560 4b. Location of Well (State Base Plane Coordinates): Surface: x- 677321 y- 5959869 Zone- ASP4 16. Deviated Wells: Kickoff Depth: 10000 feet Maximum Hole Angle: 90 degrees 18. Casing Program: Size Casing 2-7/8" Hole 3-3/4" Weight 6.16# Specifications Grade Coupling Length L-80 STL 1990' 10. KB Elevation 15. Distance to Nearest Well Within Pool (Height above GL): 57.99' feet 1,000' 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3300 Surface: 2420 Setting Dfilpth Top Bottom MD TVD MD TVD (including stage data) 10010' 8753' 12000' 8776 Uncemented Slotted Liner r 19: PRESENT WELL CONDITION SUMMARY (To be completed for RednIlANDRe-.entryOPerØti(> )s) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Effective Depth TVD 11552 8782 None 11506 8782 Structural Conductor 90' 20" 370 sx Permafrost II 90' 90' Surface 2539' 13-3/8" 1938 sx PF 'E', 400 sx PF 'C' 2539' 2539' Intermediate 7448' 9-5/8" 500 sx Class 'G', 300 sx PF 'C' 7448' 7189' Production Liner 6132' 7" 534 sx Class 'G', 274 sx 'G', 223 sx 'G' 2640' - 8772' 2640' - 8339' Liner 2951' 4-1/2" 351 sx Class 'G' 8600' - 11551' 8200' - 8782' 20. Attachments 181 Filing Fee, $100 181 BOP Sketch o Property Plat 0 Diverter Sketch perfOration Depth TVD (ft): 8809' - 8782' 181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis o Seabed Report 181 Drilling Fluid Program 181 20 AAC 25.050 Requirements Perforation Depth MD (ft): 9940' - 11430' 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Sean McLaughlin Title CT Drilling Engineer Signature ç'\.../ CLI'--:- Phone 564-4387 Date: Contact Sean McLaughlin, 564-4387 Prepared By Name/Number: Terrie Hubble, 564-4628 Permit To Drill API Number: Number: .zo6" - 0 cJ S 50- 029-21180-60-00 Conditions of Approval: Samples Re uired 0 Yes ~No Hydrog Sui de Measures .%Yes 0 No o e E 00 r~'~ . Permit Approy~ ¡: ___ Date: ;¡ /.3 tJ S Mud Log Required Directional Survey Required See cover letter for other requirements o Yes ~NO )ªYes 0 No , APPROVED BY THE COMMISSION Date 1L!Lo£e ~ . BP 15-08CLl Sidetrack . CTD Sidetrack Summary 1) Mill window off whipstock 2) Drill sidetrack 3) Run slotted liner Mud Program: · Well kill: 8.4 - 8.9 pp~e · Milling/drilling: 8.5 ~pg used Flo Pro or biozan for milling, new PIo Pro for drilling. Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: / · 27/8" pre-drilled liner completion 10,010' - 12,000' · No liner cement planned. Casin2lLiner Information 13 3/8", L-80, 72#, Burst 5380 psi; collapse 2670 psi 95/8", L-80 47#, Burst 6870, collapse 4750 7", L-80, 26#, Burst 7240 psi; collapse 5410 psi 4 Y2" L-80, 12.6#, Burst 8430 psi; collapse 7500 psi planned / 27/8" L-80 STL 6.16#, slotted liner (hole size 3.75") Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. r- · The annular pre venter will be tested to 400 psi and 2500 psi. Directional · See attached directional plan. Max. planned hole angle is 90deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. · Distance to nearest property is 28000 ft. · Distance to nearest well within pool -1000 ft. Logging · MWD directional and Gamma Ray will be run over all of the open hole section. Hazards · DS] 5 pad is not designated as an H2S pad. -- Reservoir Pressure · Res. press. is estimated to be 3300 psi at 8800'ss (7.3 ppg EMW). Max. surface pressure with gas (0.10 psi/ft) to surface is 2420 psi. /' TREE = WELLHEAD = . .- . . ACTUATOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum1VD= FMC GEN 3 FMC AXELSON 57.99' . 5800' 94 @ 10695' N/A 8800' SS 113-3/8" CSG, 72#, L-80, ID = 12.347" H 2539' ITOPOF 7" SCAB LNR, 26#, L-80 H 2640' 1 BTM OF 7" SCAB LNR, 26#, L-80 H 7265' I 19-5/8" CSG, 47#, L-80, ID = 8.681" H 7448' ~ Minimum ID = 3.725" @ 8590' 4-1/2" HES XN NIPPLE 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958"H 8602' ÆRFORA TION SUMMARY REF LOG: ANGLE AT TOP ÆRF: 88 @ 9940' Note: Refer to Production OB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 4 9940 - 9980 0 08/08/03 2-1/2" 4 1 0000 - 1 0050 0 08/08/03 2-1/2" 4 10070 - 10230 0 08/08/03 2-1/2" 4 10290 - 10400 0 08/08/03 2-1/2" 4 10510 - 10570 0 08/08/03 2-1/2" 4 10720 - 10840 0 08/08/03 2-1/2" 4 10900 - 11430 0 08/08/03 17" HES EZSV H 8790' 17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" H 9825' 1 TO H 12627' DATE 1984 10/21/93 11/22/97 08/11/03 08/15/03 02/04/04 REV BY COMMENTS ORIGINAL COM PLETION SIDETRACK (15-08A) SIDETRACK (15-08B) JDM/KK RIG SIDETRACK (15-08C) RWL/KK GL V C/O CMO/TLP ÆRF ANGLE CORRECTION DATE 15-08C ~ I ~ REV BY l J l 8 I ~ I I r ~ I ~ NOTES: *** 7" CHROME LNR; 4-112" CHROME TBG *** I ~ 2207' H 4-1/2" HES X NIP, 10 = 3.813" I ST MO 1VD 4 3291 3291 3 5590 5590 2 7600 7292 1 8457 8073 GAS LIFT MANDRELS DEV TYÆ VLV LATCH o KBG-2 DOME BK 3 KBG-2 SO BK 42 KBG-2 DMY BK 21 KBG-2 DMY BK PORT OA TE 16 08/15/03 20 08/15/03 o 08/10/03 o 08/10/03 8525' H4-1/2"HESXNIP,ID=3.813" I H 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" I H4-1/2" HES X NIP, ID = 3.813" I H 4-1/2" HES XN NIP, ID = 3.725" I H 7" X 4~ 1 /2" BKR ZXP LNR TOP PKR H 4-1/2" WLEG, 10 = 3.958" I H ELMO TT NOT LOGGED I 8546' 8570' 8590' 8600' 8602' I MILLOUT WINDOW 8772' - 8780' 14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" H 11551' I COMMENTS PRUDHOE BA Y UNIT WELL: 15-08C ÆRMIT No: 2031210 API No: 50-029-21180-03 SEC22, T11N, R14E, 4050.67' FEL & 3719.98' FNL BP Exploration (Alaska) TREE = WELLHEAD = ACTUA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVD = . 15-08C L 1--;aNOTES: ***7"CHROMELNR;4-112" CHROME TBG *** Proposed CTD Sidetrack FMC GEN 3 FMC AXELSON 57.99' 5800' 94 @ 10695' NIA . ..... . . 8800' SS 113-3/8" CSG, 72#, L-80, ID = 12.347" H 2539' 1 TOP OF 7" SCAB LNR, 26#, L-80 H 2640' I BTM OF 7" SCAB LNR, 26#, L-80 H 7265' 19-5/8" CSG, 47#, L-80, ID = 8.681" H 7448' Minimum ID = 3.725" @ 8590' 4-1/2" HES XN NIPPLE (milled to 3.8") 14-1/2" TBG, 12.6#, 13-CR. .0152 bpf, ID = 3.958"H 8602' PERFORA TION SUMMARY REF LOG: ANGLE AT TOP PERF: 88 @ 9940' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 4 9940 - 9980 0 08/08/03 2-1/2" 4 10000 - 10050 0 08/08/03 2-1/2" 4 10070 - 10230 0 08/08/03 2-1/2" 4 10290 - 10400 0 08/08/03 2-1/2" 4 10510 - 10570 0 08/08/03 2-1/2" 4 10720 - 10840 0 08/08/03 2-1/2" 4 10900-11430 0 08/08/03 17" HES EZSV - 8790' 17" LNR, 26#, 13-CR, .0383 bpf, ID = 6.276" H 9825' I TO H 12627' DATE REV BY COMMENTS 1984 ORIGINAL COMPLETION 10/21/93 SIDETRACK (15-08A) 11/22/97 SIDETRACK (15-08B) 08/11/03 JDM/KK RlGSIDETRACK{15-08C) 08/15/03 RWUKK GL V C/O 02/04/04 CMOITLP PERF ANGLE CORRECTION . . ~ I l J L g I ~ I I I r--¡ 1 ~ 1 ~ 220T H4-1/2" HES X NIP, ID = 3.813" I GAS LIFT MANDRELS ST MD TVD DEV TYÆ VLV LATCH 4 3291 3291 0 KBG-2 DOME BK 3 5590 5590 3 KBG-2 SO BK 2 7600 7292 42 KBG-2 DMY BK 1 8457 8073 21 KBG-2 DMY BK roRT DATE 16 08/15/03 20 08/15/03 o 08/10/03 o 08/10/03 8525' H4-1/2" HES X NIP, ID = 3.813" 8546' H7" X 4-1/2" BKRS-3 A<R,ID= 3.875" I 8570' - 4-1/2"HESXNIP,ID=3.813" I 8590' H4-1/2" HES XN NIP, ID = 3.725" 8600' H 7" X 4-1/2" BKR ZXP LNR TOP A<R 8602' - 4-1/2" WLEG, ID = 3.958" I H ELMD TT NOT LOGGED I MIL LOUT WINDOW 8772' - 8780' 10000' 1-1 Retrievable :-VhipstoCk & I Packer (retneved) ~ 10010' HTop of 2-7/8" liner 3-3/4" Open Hole 000000 I 12-7/8" L-80 Pre-drilled Liner H 12000' ~ 14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" H 11551' DA TE REV BY COMMENTS PRUDHOE BA Y UNIT WELL: 15-08C PERMIT No: 2031210 API No: 50-029-21180-03 SEC 22, T11N, R14E, 4050.67' FEL & 3719.98' FNL BP Exploration (Alaska) Obp . . Baker Hughes Incorporated INTEQ Planning Report .,a: INTEQ Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre bggm2004 Site: PB DS 15 TR-11-14 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5958837.36 ft 676296.98 ft Latitude: 70 17 Longitude: 148 34 North Reference: Grid Convergence: 35.236 N 21.213 W True 1.34 deg Well: 15-08 Slot Name: 15-08 Well Position: +N/-S 1007.41 ft Northing: 5959869.01 ft Latitude: +E/-W 1048.27 ft Easting: 677321.27 ft Longitude: Position Uncertainty: 0.00 ft 70 17 45.144 N 148 33 50.659 W Wellpath: Plan #6 15-08CL 1 500292118060 Current Datum: 57.99' Magnetic Data: 1/6/2005 Field Strength: 57632 nT Vertical Section: Depth From (TVD) ft 26.99 Plan: Plan #6 Lamar's Plan Principal: Yes Date Composed: Version: Tied-to: 15-08C 9947.43 ft Mean Sea Level 24.99 deg 80.86 deg Direction deg 185.00 1/6/2005 4 From: Definitive Path +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Height 57.99 ft Targets 15-08CL 1 Polygon 57.99 2459.34 20.76 5962328.00 677284.00 70 18 9.331 N 148 33 50.054 W -Polygon 1 57.99 2459.34 20.76 5962328.00 677284.00 70 18 9.331 N 148 33 50.054 W -Polygon 2 57.99 2099.67 510.44 5961980.00 677782.00 70 18 5.793 N 148 33 35.777 W -Polygon 3 57.99 1646.21 99.60 5961517.00 677382.00 70 18 1.334 N 148 33 47.756 W -Polygon 4 57.99 646.79 484.16 5960527.00 677790.00 70 1751.505 N 148 33 36.546 W -Polygon 5 57.99 549.58 279.79 5960425.00 677588.00 70 17 50.549 N 148 33 42.504 W -Polygon 6 57.99 1642.56 -127.56 5961508.00 677155.00 70 18 1.298 N 148 33 54.378 W 15-08CL 1 T1 8820.99 1644.56 -42.49 5961512.00 677240.00 70 18 1.318 N 148 33 51.898 W 15-08CL1 T2 8833.99 661.21 339.45 5960538.00 677645.00 70 1751.646N 148 33 40.765 W Annotation 9947.43 10000.00 10020.00 10060.00 10410.00 10900.00 11100.00 11400.00 11700.00 12000.00 8808.24 8809.79 8810.17 8810.49 8812.62 8817.74 8820.91 8825.09 8828.48 8834.40 TIP KOP 3 4 end of 20°/100' DLS 5 6 7 8 TD Obp . . Baker Hughes Incorporated INTEQ Planning Report B.. 8AKR: ...... INT.F.Q Plan Section Information 9947.43 88.42 309.08 8808.24 2093.53 508.91 0.00 0.00 0.00 0.00 9983.12 88.24 304.93 8809.28 2114.99 480.42 11.63 -0.50 -11.63 267.46 10000.00 88.27 304.66 8809.79 2124.62 466.57 1.61 0.18 -1.60 276.34 10020.00 89.54 303.39 8810.17 2135.81 450.00 9.00 6.37 -6.36 315.00 10060.00 89.55 295.39 8810.49 2155.42 415.17 20.00 0.01 -20.00 270.00 10410.00 89.85 225.39 8812.62 2100.54 91.16 20.00 0.09 -20.00 270.00 10900.00 89.06 166.59 8817.74 1649.92 -37.96 12.00 -0.16 -12.00 269.00 11100.00 89.15 142.59 8820.91 1470.62 47.23 12.00 0.04 -12.00 -90.00 11400.00 89.31 178.59 8825.09 1192.33 145.30 12.00 0.05 12.00 90.00 11700.00 89.44 142.59 8828.48 914.04 243.37 12.00 0.04 -12.00 -90.00 12000.00 88.37 178.58 8834.40 635.79 341.47 12.00 -0.36 12.00 92.00 Survey 9947.43 88.42 309.08 8750.25 2093.53 508.91 5961973.82 677780.61 0.00 -2129.91 0.00 MWD 9950.00 88.41 308.78 8750.32 2095.14 506.91 5961975.39 677778.58 11.63 -2131.35 267.46 MWD 9975.00 88.28 305.87 8751.04 2110.29 487.04 5961990.07 677758.36 11.63 -2144.71 267.46 MWD 9983.12 88.24 304.93 8751.29 2114.99 480.42 5961994.61 677751.63 11.63 -2148.82 267.55 MWD 10000.00 88.27 304.66 8751.80 2124.62 466.57 5962003.91 677737.56 1.61 -2157.20 276.34 MWD 10020.00 89.54 303.39 8752.18 2135.81 450.00 5962014.70 677720.73 9.00 -2166.90 315.00 MWD 10025.00 89.54 302.39 8752.22 2138.52 445.80 5962017.32 677716.46 20.00 -2169.24 270.00 MWD 10050.00 89.55 297.39 8752.42 2150.98 424.13 5962029.26 677694.51 20.00 -2179.76 270.01 MWD 10060.00 89.55 295.39 8752.50 2155.42 415.17 5962033.49 677685.45 20.00 -2183.40 270.05 MWD 10075.00 89.55 292.39 8752.62 2161.49 401.46 5962039.23 677671.60 20.00 -2188.26 270.00 MWD 10100.00 89.55 287.39 8752.82 2170.00 377.96 5962047.18 677647.91 20.00 -2194.68 270.02 MWD 10125.00 89.56 282.39 8753.01 2176.42 353.81 5962053.03 677623.61 20.00 -2198.97 270.06 MWD 10150.00 89.57 277.39 8753.20 2180.71 329.19 5962056.74 677598.90 20.00 -2201.10 270.10 MWD 10175.00 89.58 272.39 8753.39 2182.84 304.29 5962058.28 677573.96 20.00 -2201.05 270.14 MWD 10200.00 89.60 267.39 8753.56 2182.79 279.29 5962057.64 677548.97 20.00 -2198.82 270.18 MWD 10225.00 89.62 262.39 8753.73 2180.56 254.40 5962054.82 677524.14 20.00 -2194.43 270.21 MWD 10250.00 89.64 257.39 8753.89 2176.17 229.80 5962049.86 677499.65 20.00 -2187.92 270.25 MWD 10275.00 89.67 252.39 8754.04 2169.65 205.67 5962042.77 677475.69 20.00 -2179.32 270.28 MWD 10300.00 89.70 247.39 8754.18 2161.06 182.20 5962033.63 677452.43 20.00 -2168.72 270.31 MWD 10325.00 89.73 242.39 8754.31 2150.45 159.58 5962022.49 677430.06 20.00 -2156.18 270.34 MWD 10350.00 89.76 237.39 8754.42 2137.91 137.96 5962009.45 677408.74 20.00 -2141.80 270.36 MWD 10375.00 89.79 232.39 8754.52 2123.54 117.51 5961994.59 677388.65 20.00 -2125.70 270.38 MWD 10400.00 89.83 227.39 8754.60 2107.44 98.40 5961978.04 677369.92 20.00 -2107.99 270.40 MWD 10410.00 89.85 225.39 8754.63 2100.54 91.16 5961970.98 677362.84 20.00 -2100.49 270.42 MWD 10425.00 89.81 223.59 8754.67 2089.84 80.65 5961960.03 677352.59 12.00 -2088.91 269.00 MWD 10450.00 89.76 220.59 8754.76 2071.29 63.90 5961941.09 677336.28 12.00 -2068.97 269.01 MWD 10475.00 89.71 217.59 8754.88 2051.88 48.13 5961921.33 677320.98 12.00 -2048.27 269.02 MWD 10500.00 89.66 214.59 8755.02 2031.68 33.41 5961900.79 677306.74 12.00 -2026.86 269.03 MWD 10525.00 89.61 211.59 8755.18 2010.74 19.76 5961879.53 677293.59 12.00 -2004.81 269.05 MWD 10550.00 89.56 208.59 8755.36 1989.11 7.23 5961857.61 677281.57 12.00 -1982.17 269.07 MWD 10575.00 89.52 205.59 8755.56 1966.86 -4.15 5961835.10 677270.72 12.00 -1959.01 269.09 MWD 10600.00 89.47 202.59 8755.78 1944.04 -14.35 5961812.04 677261.06 12.00 -1935.39 269.11 MWD 10625.00 89.43 199.59 8756.02 1920.72 -23.35 5961788.52 677252.62 12.00 -1911.37 269.14 MWD 10650.00 89.38 196.59 8756.28 1896.96 -31.11 5961764.58 677245.42 12.00 -1887.03 269.17 MWD 10675.00 89.34 193.59 8756.56 1872.82 -37.61 5961740.30 677239.49 12.00 -1862.42 269.20 MWD 10700.00 89.30 190.59 8756.85 1848.38 -42.85 5961715.75 677234.83 12.00 -1837.61 269.23 MWD 10725.00 89.26 187.59 8757.17 1823.70 -46.80 5961690.98 677231.46 12.00 -1812.68 269.27 MWD 10750.00 89.23 184.59 8757.49 1798.85 -49.45 5961666.07 677229.40 12.00 -1787.69 269.30 MWD 10775.00 89.20 181.59 8757.84 1773.89 -50.80 5961641.09 677228.64 12.00 -1762.71 269.34 MWD 10800.00 89.17 178.59 8758.20 1748.89 -50.84 5961616.11 677229.19 12.00 -1737.81 269.39 MWD Obp . . Baker Hughes Incorporated INTEQ Planning Report ... .... INTEQ Survey 10825.00 89.14 175.59 8758.57 1723.93 -49.57 5961591.18 677231.05 12.00 -1713.05 269.43 MWD 10850.00 89.11 172.59 8758.95 1699.07 -46.99 5961566.39 677234.21 12.00 -1688.51 269.47 MWD 10875.00 89.09 169.59 8759.34 1674.38 -43.12 5961541.80 677238.66 12.00 -1664.25 269.52 MWD 10900.00 89.06 166.59 8759.75 1649.92 -37.96 5961517.47 677244.40 12.00 -1640.34 269.57 MWD 10925.00 89.07 163.59 8760.15 1625.77 -31.53 5961493.48 677251.40 12.00 -1616.84 270.00 MWD 10950.00 89.07 160.59 8760.56 1601.99 -23.84 5961469.89 677259.64 12.00 -1593.81 270.05 MWD 10975.00 89.08 157.59 8760.97 1578.64 -14.92 5961446.76 677269.11 12.00 -1571.33 270.10 MWD 11000.00 89.08 154.59 8761.37 1555.79 -4.79 5961424.16 677279.78 12.00 -1549.45 270.15 MWD 11025.00 89.10 151.59 8761.76 1533.51 6.52 5961402.14 677291.61 12.00 -1528.24 270.19 MWD 11050.00 89.11 148.59 8762.16 1511.84 18.99 5961380.78 677304.58 12.00 -1507.74 270.24 MWD 11075.00 89.13 145.59 8762.54 1490.86 32.57 5961360.13 677318.66 12.00 -1488.02 270.29 MWD 11100.00 89.15 142.59 8762.92 1470.62 47.23 5961340.24 677333.79 12.00 -1469.14 270.34 MWD 11125.00 89.15 145.59 8763.29 1450.37 61.89 5961320.35 677348.92 12.00 -1450.25 90.00 MWD 11150.00 89.15 148.59 8763.66 1429.39 75.47 5961299.69 677363.00 12.00 -1430.53 89.96 MWD 11175.00 89.16 151.59 8764.03 1407.73 87.94 5961278.33 677375.97 12.00 -1410.03 89.91 MWD 11200.00 89.16 154.59 8764.40 1385.44 99.25 5961256.32 677387.80 12.00 -1388.82 89.87 MWD 11225.00 89.17 157.59 8764.76 1362.59 109.38 5961233.71 677398.47 12.00 -1366.94 89.82 MWD 11250.00 89.19 160.59 8765.12 1339.24 118.30 5961210.58 677407.94 12.00 -1344.46 89.78 MWD 11275.00 89.20 163.59 8765.47 1315.46 125.99 5961186.99 677416.19 12.00 -1321.43 89.74 MWD 11300.00 89.22 166.59 8765.81 1291.31 132.42 5961163.00 677423.19 12.00 -1297.93 89.69 MWD 11325.00 89.24 169.59 8766.15 1266.85 137.58 5961138.67 677428.92 12.00 -1274.02 89.65 MWD 11350.00 89.26 172.59 8766.48 1242.16 141.46 5961114.08 677433.37 12.00 -1249.76 89.61 MWD 11375.00 89.28 175.59 8766.80 1217.29 144.03 5961089.28 677436.53 12.00 -1225.21 89.57 MWD 11400.00 89.31 178.59 8767.10 1192.33 145.30 5961064.36 677438.39 12.00 -1200.46 89.53 MWD 11425.00 89.31 175.59 8767.40 1167.37 146.57 5961039.44 677440.25 12.00 -1175.70 270.00 MWD 11450.00 89.31 172.59 8767.71 1142.51 149.14 5961014.64 677443.41 12.00 -1151.16 270.04 MWD 11475.00 89.32 169.59 8768.00 1117.81 153.02 5960990.05 677447.86 12.00 -1126.89 270.07 MWD 11500.00 89.32 166.59 8768.30 1093.35 158.18 5960965.72 677453.60 12.00 -1102.98 270.11 MWD 11525.00 89.33 163.59 8768.59 1069.20 164.61 5960941.73 677460.60 12.00 -1079.48 270.14 MWD 11550.00 89.34 160.59 8768.88 1045.42 172.30 5960918.13 677468.84 12.00 -1056.46 270.18 MWD 11575.00 89.35 157.59 8769.17 1022.07 181.22 5960895.00 677478.31 12.00 -1033.97 270.21 MWD 11600.00 89.37 154.59 8769.45 999.22 191.35 5960872.40 677488.98 12.00 -1012.09 270.25 MWD 11625.00 89.38 151.59 8769.72 976.93 202.66 5960850.39 677500.82 12.00 -990.88 270.28 MWD 11650.00 89.40 148.59 8769.98 955.26 215.13 5960829.02 677513.79 12.00 -970.38 270.31 MWD 11675.00 89.42 145.59 8770.24 934.28 228.71 5960808.37 677527.86 12.00 -950.66 270.35 MWD 11700.00 89.44 142.59 8770.49 914.04 243.37 5960788.47 677543.00 12.00 -931.77 270.38 MWD 11725.00 89.34 145.58 8770.76 893.79 258.03 5960768.58 677558.13 12.00 -912.88 92.00 MWD 11750.00 89.23 148.58 8771.07 872.81 271.62 5960747.93 677572.20 12.00 -893.16 91.97 MWD 11775.00 89.13 151.58 8771.42 851.15 284.08 5960726.57 677585.18 12.00 -872.67 91.93 MWD 11800.00 89.04 154.58 8771.82 828.86 295.40 5960704.55 677597.01 12.00 -851.45 91.89 MWD 11825.00 88.94 157.58 8772.26 806.01 305.53 5960681.95 677607.68 12.00 -829.57 91.84 MWD 11850.00 88.85 160.58 8772.75 782.67 314.46 5960658.83 677617.15 12.00 -807.10 91.79 MWD 11875.00 88.76 163.58 8773.27 758.89 322.15 5960635.24 677625.40 12.00 -784.08 91.73 MWD 11900.00 88.68 166.58 8773.83 734.74 328.58 5960611.25 677632.41 12.00 -760.58 91.67 MWD 11925.00 88.59 169.58 8774.42 710.29 333.74 5960586.93 677638.14 12.00 -736.67 91.60 MWD 11950.00 88.52 172.58 8775.05 685.60 337.62 5960562.34 677642.60 12.00 -712.42 91.53 MWD 11975.00 88.44 175.58 8775.72 660.75 340.20 5960537.56 677645.76 12.00 -687.88 91.45 MWD 12000.00 88.37 178.58 8776.41 635.79 341.47 5960512.64 677647.63 12.00 -663.13 91.37 MWD 15~08CL Date: 1/6/2005 #i3 (15~08/P[a'f1 #i3 Plan Pia T LEGEND 0.02 AM 1/7/2005 BP Amoco WELl-PATH DETAILS Phiin#ß 'fs.G3CL 1 500292118:060 ParøntWeJlp$¡ttI: ,....c Tie_HID: 9947.43- Rtg~ 57.99' 57.99ft Ref. Datum: V.hctiQ1'¡ ~~ ~r.i:; :=~D ""... 185,00' .... .... 26.99 REFERENCE INFORMATION TVU .... · . All Measurements are from top of Riser 1/7/2005 ~ CD (j) .- a: 15-08CL 1 top of bag r " BAG 71/16" 5000 psi. \. ~ bttm of bag middle of slips Blind/Shears .......................... middle of pipes 2 3/8" combi ram/slips I I TOTs L.............········· 7 1/16" 5000psi ...---. ...---. middle of flow cross Mud Cross Mud Cross 7 1/16" 5000psi '----' ""----" middle of blind/shears I variable bore pipe 3 1/2"-27/8" I r·· ......................., middle of pipe/slips TOTs 23/8" combi ram/slips 1..........................71/16" 5000psi Flow Tee TERRIEL HUBBlE BP EXPLORATION AK INC PO BOX 196612 MB 7-5 ANCHORAGE, AK 99519-6612 89-6/1252 172 DATË DI- (O"OS b"~.~o'l'E~_... . .. ~....~... .......ro/PD6.. ... C'c $ 1 OD.W C)..(¿ ~FWl'()Æ1 ~ <=9)~ DOLLAR5_ First. N,,"ono,. B.ankAI.a. 'k. a ~_ '.. ::::or;S:Ö~ L t 7 'J!)vkt~. ~ "Mastercard Check" . I: ~ 25 20UObOI:~~ ~t."lb 2 27"' ~55b"· 0 ~7 2 . . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~~0 IS-07C¿/ '- PTD# ZOS- ..JOd_L;" X Development Service CHECKWHAT APPLJES ADD-ONS (OPTIONS) M1JLTI LATERAL x (If API number last two (2) digits are between 60-69) Exploration Stratigraphic ~'CLUE"· Tbe permit is for a new well bore ·segment of existing well l-ð ~ / § - P <?C- Permit No,2oJ~/¿/ API No. 50-~ f__¿J}?ð ....t:).J ProductioD. sbould continue to be reponed as a function ·of tbe original API number. stated above. . BOLE )n accordance witb 20 AAC 25.005(1), aU records, data and logs acquired for tbe pilot bole must be clearly differentiated In botb name (name on permit plus PH) and API Dumber (SO 70/80) from records, data and logs acquired for wen (name on permit). PJLOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Tbe permit is approved subject ·to fun compliance witb 20 AAC 2S..0SS~ Approval10 perforate and produce is contingent upon issuance of ~ conservation order approving a spacing exception. (Company Name) assumes tbe liability of aDY protest to tbe spacing .~Jcep1ion tbat may occur. AU dry ditcb sample sets submitted to tbe Commission must be in no greater 1baD 30' sample intervals from below tbe permafrost or from wbere samples are fint caught aDd ] 0' sample iIiter:vals through target zones. . . ~ D Well bore seg Annular Disposal ield & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT 15-08CL 1 Program DEV LORATION (ALASKA) INC Initial ClassfType DEV 11-0IL~GeoArea 890 Unit 11650 On/Off Shore On Pe(mit fee attached Y.es 2 .Leas.e .n!Jmber .apRro¡:¡riat.e. . - - - - - Yes 3 .U.nlq!Je weltn.am.e.a!lc! Ol!llJb.er . . . . . . . . . . . . . . . . . . . . . . ...... Yes - - - - - - - - - - - - - - - - 4 Well JQc¡¡t.ed lna defil1e.d .ppol. - - - - - - Y.es 5 W~IIJQc¡¡t.ed prop~r .dlsta!lce from driJIing !Jl1itboUl1d.al)'. . Yes - - - - 6 W~II JQc¡¡t.ed pr.oper .distance. from Qther wet!s. Y.es - - - - ~ 7 S.uffiçiel1taçreage.ayailable indrilJiog unjt . Yes 8 Jfd.eviated, js weJlbQre platil1cluded . . - - - - ~ - - - - - Y.es 9 Ope(ator ()I]Iy- affeçted party. . . . . . . - - - - - - - - - - Yes - - - - - - 10 .Ope(ator bas.apprpprlate.b.ond inJQrce. . . . . . . . . . . . . . . . . .... Yes - - - - - - - - - - - - - - - - . - - 11 P.el111it ca!l be lSSl!ed wjtbQut co.nservatiOI1 order. . Y.es - - - - - - - - - - - - - Appr Date 12 P.e(llJit c.a!l be iSSl!ed wjthQut adllJil1ist(atille.appr.ovaJ . . . . . . . . · . . . Y.es RPC 1/11/2005 13 Can permit be approved before 15-day wait Yes 14 We.IIJQc¡¡ted withil1 area alld.strat¡¡authorized by l!ljectipo Ord.e( # (P!JUO# in.c.omme!lts) (ForNA - - - - -- 15 .AllwelJs.wit)1lnJl4.mile.ar~a.of(eYiewjd.eotified(F.o(Servjc.ew.ellOl1ly)............... NA. - - -- - - - - - - - - -- 16 Pre-produçecl i!ljector; .duratio.n of pre-pro.ductipl1 l.ess. than 3 mOl1ths (For.ser:vlce well Qnly) . NA 17 ACMP F"il1djng.of CQn.si,Ste!lcy h.as been iss!Jedfor this project . . . . . . .NA - - - - - - - - - - - - Engineering 18 .C.oodu.ctor st(illg.prQvided . . . . . . . NA - - - - - - .19 .Surfac.ecasil1g.pJQtec.ts all.known USDWs . . - - - - - - - - - - NA I 20 CMT.v.oladequate.to çirc.uLateoncOl1d.uçtpr.& SUJf.C$g . . - - - - - NA 21 CMT. vol adequate.to tie-inJQngstri!lg to.s!J1"f çsg. . . . . . NA 22 CMT. wit! coyera)l koow.npro.d!Jctiye hQrizons. . . . - - - - - NA Slotted, - - - - - - 23 C.asi!lg desig!lS aclequa.t~ f.o( C,.T, B& ¡:¡ermafros! . . . . . - - - - - Y.es 24 A.dequatetankage.oJ reserve pit. · . . . Y.es CTDU........... . 25 Jfa.re-.d(iII~ has a lOA03 fQr abandOllllJent be.e!l ¡¡PPJQv!:d . NA Lateral. 26 .A.dequate.,^"ellbor~ separ¡¡tjo.n.propose.d. . . . - - - - - - - - - - - - - - - - -- . . . . . . . . .Y.es - - - - - - - - - - - - - - - - - - 27 Jfdjv!:ct~r required, dQes it me!:t reguJatipos - - - - - - NA Sidet(ack. . - - - - - - Appr Date 28 DriUiog fJujd.¡:¡rQgrallJ sch!:matic& eQ.uipJis!adequate. - - - - - - - - - - Yes Max MW8Ji ¡:¡pg. WGA 1/12/2005 29 .B.OPEs, do .they me!:t reguJatioo . . . . . . . . - - - - - - - - - - - - Yes - - - - - - 30 BOPE.pr~ss ratillg app(op(iate;.test to.(put PSig In.comm!:l1ts). . · . . . Y.es T~st to 3500. ¡:¡sLMSF> 24.20 psi 31 C.hokemanifold çQllJpJies w/APt RF>-53 (May 134). . . . . . . Y.es - - - - - - - 32 WQrk will pcc.U( withoutoperationshutdow.n. . . Yes 33 .Is Rresence. Qf H2S gas ¡:¡rQb.abl!: . No. IIIQt.<l1l H2S pad. 34 Meçba.nicalcpodJUon .ot w~lIs withil1 AOR yerifiecl (Forservje¡: w!:1J Ollly). . NA Geology 35 P!:(llJit call be lSSl!ed wfo hydr.ogen sulfide meaSJJœs. . . N.o 36 .D.ata.pr~s!:otecl Qn. ¡:¡ote.ntial PveJRress!Jr!: .zOl1es. - - - - ~ NA Appr Date 37 .S!:ismicanalysjs. Qf sbaJlow gasz.o1les . . . . . NA - - - - - RPC 1/11/2005 38 .S.eabe.dcondjtipo sl!rvey(if Off-sh.o(e) . NA - - - - - - - 139 CQnta.ct namelphOlleJQr,^"ee~ly progress reports [explQratpry .o!lly] - - - - - NA Geologic Date: Engineering Date (~" Date Commissioner: Commissioner: OG:s ( J 2f--S Ø~r . . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. e e Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Mar 08 16:16:01 2007 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .07/03/08 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name......... ... .LISTPE Date.................... .07/03/08 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name... ....... ... ...UNKNOWN Continuation Number... ...01 Previous Tape Name..... ..UNKNOWN Comments....... ........ ..STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA 15-08CL1 500292118060 BP Exploration (Alaska) Inc. Sperry Drilling Services 08-MAR-07 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 W-0003560124 B. JAHN B. HOLT/B. L MWD RUN 2 W-0003560124 B. JAHN B. HOLT/B. L # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 22 11N 1U: 164,5 1378 MSL 0) 57.99 dD6 --roS- "= 11.157-3 e e # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3.750 4.500 10016.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 10016'MD/8752'TVDSS IN THE 15-08C WELLBORE. 4. MWD RUNS 1 & 2 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG) UTILIZING A SCINTILLATION DETECTOR. 5. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED-HOLE GAMMA RAY LOG RUN IN 15-08C LION 1 MARCH 2005. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY D. DORTCH ON 10 JANUARY 2007. 6. MWD RUNS 1 & 2 REPRESENT WELL 15-08C L1 WITH API#: 50-029-21180-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12317'MD/8765'TVD. SROP SGRD $ SMOOTHED RATE OF PENETRATION WHILE DRILLING. SMOOTHED NATURAL GAMMA RAY COMBINED. File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .07/03/08 Maximum Physical Record. .65535 File Type............... .LO Previous File Name..... ..STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP 1 and clipped curves; all bit runs merged. .5000 START DEPTH 9972.5 10041.0 STOP DEPTH 12296.0 12326.5 e e $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH -- BASELINE DEPTH GR 9973.0 9961. 5 9977.5 9967.0 9986.0 9975.5 10013.5 10004.0 10016.0 10007.0 10020.0 10011.0 10025.5 10015.5 10027.5 10018.5 10029.0 10019.5 10030.5 10021.5 10041.0 10032.5 10047.0 10038.0 10050.5 10042.5 10082.5 10073.5 10099.5 10090.0 10111.5 10101. 5 10117.0 10106.0 10126.0 10115.5 10134.5 10124.5 10138.0 10128.0 10153.5 10143.5 10158.5 10148.5 10181. 0 10172.0 10183.0 10174.0 10189.5 10179.5 10202.5 10192.5 10218.5 10208.5 10220.0 10210.5 12326.5 12317.0 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 9961.0 10450.0 MWD 2 10450.0 12317.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction...... .......... . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record.... .........Undefined Absent value.......... ........... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 Name Service Order DEPT GR MWD Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 API 4 1 68 4 2 e e ROP MWD FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9972.5 12326.5 11149.5 4709 9972.5 12326.5 GR MWD API 28.46 938.95 78.0616 4605 9972.5 12296 ROP MWD FT/H 9.55 3869.02 135.913 4572 10041 12326.5 First Reading For Entire File......... .9972.5 Last Reading For Entire File.......... .12326.5 File Trailer Service name....... ... ...STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..07/03/08 Maximum Physical Record..65535 File Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name. ....... ... ..STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.......07/03/08 Maximum Physical Record. .65535 File Type................ LO Previous File Name.... ...STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 9961.0 10032.5 STOP DEPTH 10419.5 10450.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 26-FEB-05 Insite 7.75 e DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction........ ........ . Down Optical log depth units.......... .Feet Data Reference Point... ........ ...Undefined Frame Spacing.... ...... ....... ....60 .1IN Max frames per record........... ..Undefined Absent value. ........ ............ .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT GR MWD010 ROP MWD010 Units FT API FT/H Code Size 4 4 4 Nsam Rep 1 68 1 68 1 68 e Memory 10450.0 10032.0 10450.0 86.0 94.4 TOOL NUMBER TLGOll 3.750 10016.0 Flo Pro 8.60 65.0 9.0 23000 10.2 .000 .000 .000 .000 .0 145.9 .0 .0 Offset o 4 8 Channel 1 2 3 e e First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9961 10450 10205.5 979 9961 10450 GR MWD010 API 32.74 938.95 86.3036 873 9961 10419.5 ROP MWD010 FT/H 16 161.96 60.3341 836 10032.5 10450 First Reading For Entire File......... .9961 Last Reading For Entire File.. ........ .10450 File Trailer Service name........... ..STSLIB.002 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation. .... ..07/03/08 Maximum Physical Record..65535 File Type............ ....LO Next File Name........ ...STSLIB.003 Physical EOF File Header Service name....... ... ...STSLIB.003 Service Sub Level Name... Version Number....... ....1.0.0 Date of Generation...... .07/03/08 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 3 header data for each bit run in separate files. 2 .5000 START DEPTH 10420.0 10450.5 STOP DEPTH 12286.5 12317.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): 01-MAR-05 Insite 7.75 Memory 12317.0 10450.0 12317.0 e BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record...... ...... . Undefined Absent value.. ... ...... .... ...... .-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub--type... 0 Name DEPT GR ROP Service Order Nsam Rep 1 68 1 68 1 68 Code Units FT API FT/H Size 4 4 4 MWD020 MWD020 Last Name Service Unit Reading Min Max e 84.4 93.6 TOOL NUMBER TLG015 3.750 10016.0 Flo Pro 8.70 65.0 8.5 24000 5.8 .000 .000 .000 .000 .0 162.8 .0 .0 Offset o 4 8 Channel 1 2 3 First Mean Nsam Reading e e DEPT FT 10420 12317 11368.5 3795 10420 12317 GR MWD020 API 28.46 199.85 75.9726 3734 10420 12286.5 ROP MWD020 FT/H 9.55 3869.02 152.858 3734 10450.5 12317 First Reading For Entire File......... .10420 Last Reading For Entire File.... ...... .12317 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number... ...... ..1.0.0 Date of Generation..... ..07/03/08 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .07/03/08 Origin.................. .STS Tape Name.............. ..UNKNOWN Continuation Number..... .01 Next Tape Name. . . . . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name........... ..LISTPE Date.................... .07/03/08 Origin.................. .STS Reel Name............... .UNKNOWN Continuation Number.... ..01 Next Reel Name. . . . . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File