Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-0141 Regg, James B (OGC) From:PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent:Friday, August 25, 2023 7:28 AM To:Regg, James B (OGC) Cc:Bo York; Oliver Sternicki; PB Wells Integrity Subject:OPERABLE: Producer 14-28B (PTD #2160140) passed warm TIFL Mr. Regg,  Producer 14‐28B (PTD # 2160140) was brought online on 08/24 and a passing warm TIFL was performed on 08/25. The  passing TIFL indicates two competent well barriers and the well will be classified back to OPERABLE.  Please respond with any questions.  Andy Ogg  Hilcorp Alaska LLC  Field Well Integrity  andrew.ogg@hilcorp.com  P: (907) 659‐5102  M: (307)399‐3816   From: PB Wells Integrity   Sent: Tuesday, August 15, 2023 10:48 AM  To: jim.regg@alaska.gov  Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Bo York <byork@hilcorp.com>; Oliver Sternicki  <Oliver.Sternicki@hilcorp.com>  Subject: UNDER EVALUATION: Producer 14‐28B (PTD #216014) Sustained Casing Pressure Over NOL TIFL Failed  Mr. Regg,  Producer 14‐28B (PTD #2160140) was reported by operations with increasing IA pressure and failed TIFL on 08/12. Due  to ongoing pad shut down, the IAP exceeded IA NOL 2100 psi on 08/15. The well was already classified as UNDER  EVALUATION internally and in on a 28 day clock to be resolved. Please see attached TIO plot document.  Plan Forward:  1.Downhole Diagnostics: Warm TIFL after pad startup 2.Well Integrity: Further action as required. Please call with any questions or concerns.   Ryan Holt  Hilcorp Alaska LLC  Field Well Integrity / Compliance  Ryan.Holt@Hilcorp.com  CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. PBU 14-28BPTD 2160140 2 P: (907) 659‐5102  M: (907) 232‐1005    From: PB Wells Integrity   Sent: Sunday, August 13, 2023 10:07 AM  To: Alaska JMS User <akimsuser@hilcorp.com>; Carrie Janowski <Carrie.Janowski@hilcorp.com>; Jerry Lau  <Jerry.Lau@hilcorp.com>; PB EOC Specialists <PBEOCSpecialists@hilcorp.com>; PB Wells Optimization Engineers  <PBWellsOptimizationEngineers@hilcorp.com>; PBE FS3 Drill Sites <FS3DrillsitesFS3Drillsites@hilcorp.com>; PBE FS3  Field Lead Operator <PBEFS3FieldLeadOperator@hilcorp.com>; PBE FS3 Foreman <PBEFS3Foreman@hilcorp.com>  Cc: Bo York <byork@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Nick Frazier <nfrazier@hilcorp.com>  Subject: UNDER EVALUATION: Producer 14‐28B (PTD #216014) TIFL Failed    All,  Producer 14‐28B (PTD #2160140) was reported by operations with increasing IA pressure and failed TIFL on 08/12. The  well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved. IA pressure did not exceed NOL and  agency reporting is not required.     Please call with any questions or concerns.     Ryan Holt  Hilcorp Alaska LLC  Field Well Integrity / Compliance  Ryan.Holt@Hilcorp.com  P: (907) 659‐5102  M: (907) 232‐1005    From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>   Sent: Thursday, September 29, 2016 5:20 PM  To: AK, OPS FS3 OSM <AKOPSFS3OSM1@bp.com>; AK, OPS FS3 Facility OTL <AKOPSFS3FacilityOTL@bp.com>; AK, OPS  FS3 Field OTL <AKOPSFS3FieldOTL@bp.com>; AK, OPS FS3 DS Ops Lead <AKOPSFS3DSOpsLead@bp.com>; Cismoski,  Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; AK, RES GPB West Wells Opt Engr  <AKRESGPBWestWellsOpt@BP.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>;  AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS Prod  Controllers <AKOPSProdControllers@bp.com>; G GPB FS3 Drillsites <ggpbfs3drillsites@BP.com>; Vohra, Prachi  <Prachi.Vohra@bp.com>; Oshiro, Joleen <JOLEEN.OSHIRO@bp.com>; AK, GWO SUPT Well Support  <akdcfieldsupportsuperintendent@bp.com>  Cc: AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO Projects Well Integrity  <AKDCProjectsWellIntegrityEngineer@bp.com>; AK, GWO Completions Well Integrity  <AKDCWLCompletionsSupt@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK,  OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>;  Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey  <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; Pettus, Whitney  <Whitney.Pettus@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Troy <Troy.Tempel@bp.com>;  Worthington, Aras J <Aras.Worthington@bp.com>  Subject: OPERABLE: Producer 14‐28B (PTD #2160140) Rotary Sidetrack Complete    All,  3 Producer 14‐28B (PTD #2160140) is a new rotary sidetrack. The rig performed a passing MIT‐T, and a passing MIT‐IA, to  3500 psi on 09/25/16. Well tie‐in will be commencing soon. The well is reclassified as Operable.  Please be aware of the fluid‐packed annuli when bringing the well online.  Thanks,  Adrienne McVey Well Integrity Superintendent – GWO Alaska (Alternate: Jack Lau)  O: (907) 659‐5102  C: (907) 943‐0296  H: 2376  Email: AKDCWellIntegrityCoordinator@BP.com     The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.     a/( -01q , Meredith D From: Schwartz, Guy L (CED) Sent: Thursday, June 27, 2019 3:55 PM To: Davies, Stephen F (CED); Seamount, Dan T (CED); Chmielowski, Jessie L C (CED); Roby, David S (CED); Colombie, Jody J (CED); Guhl, Meredith D (CED); Rixse, Melvin G (CED); Ballantine, Tab A (LAW); Regg, James B (CED) Subject: RE: Bonding letters update - Pioneer Natural Resources Wells Agree.. drop them from the list. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to You, contact Guy Schwartz at (907-793-1226) or (Guy.schwartz@aloska aov). From: Davies, Stephen F (CED) Sent: Thursday, June 27, 2019 2:33 PM To: Seamount, Dan T (CED) <dan.seamount@alaska.gov>; Chmielowski, Jessie L C (CED) <jessie.chmielowski@alaska.gov>; Roby, David S (CED) <dave.roby@alaska.gov>; Colombie, Jody J (CED) <jody.colombie@alaska.gov>; Guhl, Meredith D (CED) <meredith.guhl@alaska.gov>; Schwartz, Guy L (CED) <guy.schwartz@alaska.gov>; Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>; Ballantine, Tab A (LAW) <tab.ballantine@alaska.gov>; Regg, James B (CED) <jim.regg@alaska.gov> Subject: RE: Bonding letters update - Pioneer Natural Resources Wells All, Pioneer has two wells on the bond list: Hailstorm 1 (2151850) and Cronus 1 (2160140). Based on site photos in the well history files, no significant surface disturbance visible on very good -resolution Google Earth photos, and concurrence from Jim, Guy and/or Mel, I vote to change the location clearance status in RBDMS, drop these wells from the bond list, and eliminate the bond letter to Pioneer. Thoughts? Thanks, Steve D. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesrdalaska gov. From: Davies, Stephen F (CED) Sent: Thursday, June 27, 2019 1:46 PM DATA SUBMITTAL COMPLIANCE REPORT 5/16/2017 Permit to Drill 2160140 Well Name/No. PRUDHOE BAY UNIT 14-28B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20708-02-00 MD 11237 TVD 8905 REQUIRED INFORMATION Completion Date 9/25/2016 Mud Log No ' Completion Status 1-011- Samples -OIL Samples No,/ DATA INFORMATION Types Electric or Other Logs Run: MWD/GR/RES, MWD/GR/RES/DEN/NEU Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data ED C 27963 Digital Data AOGCC Page t of 3 Current Status 1-0I1- UIC No Directional Survey Yes,/ (data taken from Logs Portion of Master Well Data Maint) Interval OH / Start Stop CH Received Comments 3638 11237 2/9/2017 Electronic Data Set, Filename: 14- 28B_ BHI_ LTK_MEM_Composite Drilling Depth Data.las 2/9/2017 Electronic File: 14-28B_BHI_LTK_2MD_Memory Drilling Log.cgm 2/9/2017 Electronic File: 14- 28B_BHI_LTK_2TVDSS_Memory Drilling ' Log.cgm 2/9/2017 Electronic File: 14-28B_BHI_LTK_5MD_Memory ' Drilling Log.cgm 2/9/2017 Electronic File: 14- 28B_BHI_LTK_5TVDSS_Memory Drilling Log.cgm 2/9/2017 Electronic File: 14-28B BHI LTK- VSS_Composite Drilling Mechanics Depth ' Log.cgm 2/9/2017 Electronic File: 14- 28B_ BHI_ LTK_MEM_Composite Drilling Depth Data.dls 2/9/2017 Electronic File: 14-28B_BHI_LTK_2MD_Memory { Drilling Log.pdf 2/9/2017 Electronic File: 14- P 28B_BHI_LTK_2TVDSS_Memory Drilling Log.pdf ' 2/9/2017 Electronic File: 14-28B_BHI_LTK_5MD_Memory Drilling Log.pdf 2/9/2017 Electronic File: 14- P28B_BHI_LTK_5TVDSS_Memory Drilling Log.pdf Tuesday, May 16, 2017 DATA SUBMITTAL COMPLIANCE REPORT 5/16/2017 Permit to Drill 2160140 Well Name/No. PRUDHOE BAY UNIT 14-28B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20708-02-00 MD 11237 TVD 8905 Completion Date 9/25/2016 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 27963 Digital Data 2/9/2017 Electronic File: 14-28B_BHI_AOGCC Offset ' Report.pdf ED C 27963 Digital Data 2/9/2017 Electronic File: 14-28B_BHI_Final Survey Report.pdf ED C 27963 Digital Data 2/9/2017 Electronic File: 14-28B_BHI_Final Survey ' Report.txt ED C 27963 Digital Data 2/9/2017 Electronic File: 14-28B_BHI_Final Surveys.csv ' ED C 27963 Digital Data 2/9/2017 Electronic File: 14-28B_BHI_Final Surveys.xls ' Log C 27963 Log Header Scans 0 0 2160140 PRUDHOE BAY UNIT 14-28B LOG HEADERS Well Cores/Samples Information: Name INFORMATION RECEIVED ,,�� Completion Report V Production Test Informatiort�Y NA Geologic Markers/Tops COMPLIANCE HISTORY Completion Date: 9/25/2016 Release Date: 1/28/2016 Description Comments: Interval Start Stop Directional / Inclination DataVY ) Mechanical Integrity Test Information Y Daily Operations Summary e Date Comments Sample Set Sent Received Number Comments Mud Logs, Image Files, Digital Data Y NA Core Chips YPNA Composite Logs, Image, Data File Core Photographs Y Cuttings Samples \YY NA� Laboratory Analyses Y AOGCC Page 2 of 3 Tuesday, May 16, 2017 DATA SUBMITTAL COMPLIANCE REPORT 5/16/2017 Permit to Drill 2160140 Well Name/No. PRUDHOE BAY UNIT 14-28B MD 11237 Compliance Revie 9/16 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20708-02-00 Completion Status 1-0I1- Current Status 1 -OIL / // UIC No Date: �! !`v `_ AOGCC Page 3 of 3 Tuesday, May 16, 2017 raitiRECEIY BAKER PRINT DISTRIBUTION LIST HUGHES FEB 0 9 2017 COMPANY BP Exploration Alaska Inc. WELL NAME4-28B FIELD Prudhoe Bay Unit 216614 2796 3 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 DATA LOGGED 2-/\5/2017 900 E. Benson Blvd. iv1. K. BENDER Anchorage, Alaska 99508 to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL Paul.CanizaresCcDbakerhucihes.com GR-RES-DEN-NEU STK:Image Log LOG DATE September 21, 2016 TODAYS DATE February 8, 2017 Revision STATUS Final Replacement: No Details: COMPANY ADDRESS CEDEX WILL NOT DELIVER TO P.O. BO* PERSON ATTENTION Rev. Requested by: FIELD / FINAL CD/DVD FINAL PRELIM (las, dlis, PDF, META, I SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 4 4 4 4 4 4 t BP North Slope. 0 1 1 1 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 3 1 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 IAnchorage, AK 99503 4lStateofAlaska -AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR -Division of Oil & Gas *** Attn: James Ryun 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 *** Stamp "confidential' on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: TOTALS FOR ALL PAGES: 0 1 1 1 0 0 3 5 4 0 0 3 5 4 0 Prudhoe Bay PB DS 14 14-28 14-28B 500292070802 Design: 14-28B Final Survey Report 23 September, 2016 FS i ' I a-- a BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: 14-28B Design: 14-28B BP FSA a2 Final Survey Report BAKER HUGHES Local Co-ordinate Reference: Well 14-28 TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 14, TR -10-14 - Audit Notes: Site Position: Northing: 5,939,577.430 usft Latitude: 70° 14'26.346 N From: Map Easting: 674,150.480 usft Longitude: 1480 35'36.726 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.32 ° _ _ Well 14-28,14-28 -_-- ---_-- —__--- Well Position +N/ -S 0.00 usft Northing: 5,938,008.700 usft Latitude: 70° 14'10.572 N +E/ -W 0.00 usft Easting: 675,677.820 usft Longitude: 148° 34'53.399 W Position Uncertainty 0.00 usft Wellhead Elevation: 42.34 usft Ground Level: 41.48 usft Wellbore 14-28B I Magnetics Model Name Sample pate Declination Dip Angle Field Strength (I (I (nT) BGGM2016 9/9/2016 18.29 80.99 57,556 Design 14-28B - Audit Notes: Version: Phase: ACTUAL Tie On Depth: 3,617.48 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (1) 46.14 0.00 0.00 95.0,0---- 912312016 10.43:36AM Page 2 COMPASS 5000.1 Build 818 b BP FS&6 p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 9/23/2016 Azi (azimuth) TVD From To EIW Northing (usft) (usft) Survey (Wellbore) Tool Name Description 117.48 3,617.46 14-22 Srvy 2 GYD-GC-CMS (14-28) GYD-CT-CMS Gyrodata cont.casing m/s 3,670.00 9,164.21 BHI OTK MWD 8-1/2" (14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 9,222.53 11,203.03 BHI ATK MWD 6 1/8" (14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal >urvey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft 46.14 0.00 0.00 46.14 -42.34 0.00 0.00 5,938,008.700 675,677.820 0.00 117.48 0.23 157.16 117.48 29.00 -0.13 0.06 5,938,008.569 675,677.879 0.32 217.48 0.27 184.00 217.48 129.00 -0.55 0.12 5,938,008.151 675,677.950 0.12 317.48 0.34 228.07 317.48 229.00 -0.99 -0.12 5,938,007.712 675,677.723 0.24 417.48 0.14 257.50 417.48 329.00 -1.21 -0.46 5,938,007.480 675,677,388 0.23 517.48 0.02 37.34 517.48 429.00 -1.22 -0.57 5,938,007.465 675,677.280 0.16 617.48 0.16 102.81 617.48 529.00 -1.24 -0.42 5,938,007.451 675,677.427 0.15 717.48 0.22 104.07 717.48 629.00 -1.32 -0.10 5,938,007.381 675,677.751 0.06 817.48 0.37 93.48 817.47 728.99 -1.38 0.41 5,938,007.326 675,678.261 0.16 917.48 0.17 120.14 917.47 828.99 -1.48 0.86 5,938,007.243 675,678.714 0.23 1,017.48 0.41 127.83 1,017.47 928.99 -1.77 1.27 5,938,006.959 675,679.131 0.24 1,117.48 0.18 135.58 1,117.47 1,028.99 -2.10 1.66 5,938,006.636 675,679.531 0.23 1,217.48 0.40 235.63 1,217.47 1,128.99 -2.41 1.48 5,938,006.323 675,679.360 0.47 1,317.48 0.72 220.64 1,317.46 1,228.98 -3.09 0.79 5,938,005.633 675,678.679 0.35 1,417.48 0.76 216.15 1,417.46 1,328.98 -4.10 -0.01 5,938,004.603 675,677.902 0.07 1,517.48 0.66 209.68 1,517.45 1,428.97 -5.13 -0.69 5,938,003.551 675,677.250 0.13 1,617.48 0.39 201.53 1,617.44 1,528.96 -5.95 -1.10 5,938,002.725 675,676.859 0.28 1,717.48 0.30 198.62 1,717.44 1,628.96 -6.52 -1.31 5,938,002.156 675,676.664 0.09 1,817.48 0.25 164.24 1,817.44 1,728.96 -6.97 -1.33 5,938,001.697 675,676.650 0.17 1,917.48 0.38 147.42 1,917.44 1,828.96 -7.46 -1.09 5,938,001.213 675,676.900 0.16 V. Sec (usft) 0.00 0.07 0.16 -0.03 -0.35 -0.46 -0.31 0.02 0.53 0.9t 1.42 1.84 1.69 1.05 0.34 -0.24 -0.58 -0.74 -0.72 -0.44 9/23/2016 10:43:36AM Page 3 COMPASS 5000 1 Build 81B Survey BP .INas pFinal Survey Report BAKER I HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Survey I MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) (") (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 2,017.48 0.52 133.24 2,017.44 1,928.96 -8.05 -0.59 5,938,000.635 675,677.422 0.18 0.12 2,117.48 0.56 120.77 2,117.43 2,028.95 -8.61 0.16 5,938,000.092 675,678.186 0.12 0.9: 2,217.48 0.29 132.38 2,217.43 2,128.95 -9.04 0.77 5,937,999.686 675,678.802 0.28 1.56 2,317.48 0.46 159.53 2,317.43 2,228.95 -9.58 1.10 5,937,999.147 675,679.142 0.24 1.93 2,417.48 0.37 103.94 2,417.43 2,328.95 -10.04 1.55 5,937,998.704 675,679.606 0.40 2.42 2,510.48 0.11 72.74 2,510.42 2,421.94 -10.08 1.93 5,937,998.668 675,679.987 0.30 2.80 13 3/8" 2,517.48 0.10 64.45 2,517.42 2,428.94 -10.08 1.94 5,937,998.673 675,679.999 0.30 2.82 2,617.48 0.35 121.80 2,617.42 2,528.94 -10.20 2.28 5,937,998.557 675,680.340 0.31 3.16 2,717.48 0.15 65.19 2,717.42 2,628.94 -10.31 2.66 5,937,998.460 675,680.721 0.30 3.55 2,817.48 0.44 109.54 2,817.42 2,728.94 -10.38 3.14 5,937,998.398 675,681.203 0.35 4.04 2,917.48 0.28 140.32 2,917.42 2,828.94 -10.70 3.66 5,937,998.094 675,681.728 0.25 4.58 3,017.48 0.20 161.31 3,017.42 2,928.94 -11.05 3.87 5,937,997.745 675,681.948 0.12 4.82 3,117.48 0.33 136.86 3,117.42 3,028.94 -11.42 4.13 5,937,997.376 675,682.210 0.17 5.11 3,217.48 0.53 127.61 3,217.41 3,128.93 -11.92 4.69 5,937,996.897 675,682.784 0.21 5.71 3,317.48 0.60 139.05 3,317.41 3,228.93 -12.59 5.40 5,937,996.236 675,683.509 0.13 6.48 3,417.48 0.48 153.72 3,417.41 3,328.93 -13.37 5.93 5,937,995.477 675,684.056 0.18 7.0- 3,517.48 3.05 98.75 3,517.35 3,428.87 -14.15 8.74 5,937,994.763 675,686.889 2.80 9.94 3,617.48 6.06 99.33 3,617.03 3,528.55 -15.41 16.58 5,937,993.685 675,694.755 3.01 17.86 TIP 3,670.00 7.77 104.54 3,669.16 3,580.68 -16.75 22.75 5,937,992.488 675,700.957 3.46 24.13 KOP 3,697.81 9.27 93.29 3,696.67 3,608.19 -17.35 26.81 5,937,991.982 675,705.026 8.04 28.22 Interpolated Azimuth 3,698.93 9.33 92.91 3,697.77 3,609.29 -17.36 26.99 5,937,991.977 675,705.207 7.54 28.40 96/81, 3,791.16 15.02 73.31 3,787.93 3,699.45 -14.30 45.93 5,937,995.473 675,724.066 7.54 47.001 3,824.79 14.32 64.10 3,820.47 3,731.99 -11.23 53.84 5,937,998.725 675,731.908 7.23 54.62 9/23/2016 10.43:36AM Page 4 COMPASS 5000.1 Build 81B b BP riAl pFinal Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Survey - - MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) M (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 3,857.11 13.70 53.10 3,851.83 3,763.35 -7.19 60.50 5,938,002.923 675,738.469 8.45 60.90 3,885.42 13.32 43.34 3,879.36 3,790.88 -2.80 65.42 5,938,007.422 675,743.285 8.16 65.42 3,920.04 12.08 31.35 3,913.14 3,824.66 3.19 70.04 5,938,013.523 675,747.767 8.39 69.50 3,951.48 10.34 18.46 3,943.98 3,855.50 8.68 72.65 5,938,019.069 675,750.243 9.67 71.62 3,981.30 8.38 19.30 3,973.40 3,884.92 13.27 74.22 5,938,023.694 675,751.702 6.59 72.78 4,075.04 9.51 28.58 4,066.01 3,977.53 26.52 80.18 5,938,037.076 675,757.354 1.95 77.56 4,169.88 12.38 14.95 4,159.13 4,070.65 43.23 86.55 5,938,053.928 675,763.336 4.06 82.45 4,264.45 12.94 6.93 4,251.40 4,162.92 63.53 90.44 5,938,074.319 675,766.754 1.95 84.56 4,359.42 13.90 356.04 4,343.80 4,255.32 85.47 90.94 5,938,096.263 675,766.738 2.84 83.14 4,452.76 15.80 346.59 4,434.03 4,345.55 109.02 87.22 5,938,119.720 675,762.469 3.29 77.38 4,548.61 18.67 342.20 4,525.57 4,437.09 136.33 79.50 5,938,146.838 675,754.117 3.29 67.32 4,643.49 21.85 337.67 4,614.57 4,526.09 167.13 68.15 5,938,177.365 675,742.049 3.73 53.32 4,738.40 23.64 337.48 4,702.10 4,613.62 201.05 54.15 5,938,210.945 675,727.264 1.89 36.42 4,833.17 24.99 337.54 4,788.46 4,699.98 237.10 39.22 5,938,246.639 675,711.503 1.42 18.41 4,928.31 i 25.03 334.69 4,874.68 4,786.20 273.87 22.94 5,938,283.015 675,694.369 1.27 _1.02 5,022.71 24.93 331.27 4,960.25 4,871.77 309.37 4.84 5,938,318.082 675,675.447 1.53 -22.1`_ 5,116.64 25.00 330.21 5,045.41 4,956.93 343.96 -14.54 5,938,352.204 675,655.271 0.48 -44.46 5,211.21 24.85 330.18 5,131.17 5,042.69 378.54 -34.35 5,938,386.314 675,634.662 0.16 -67.21 5,306.36 24.99 329.91 5,217.46 5,128.98 413.28 -54.37 5,938,420.571 675,613.841 0.19 -90.18 5,399.79 26.10 328.98 5,301.76 5,213.28 447.97 -74.86 5,938,454.772 675,592.553 1.26 -113.61 5,495.09 26.42 329.24 5,387.22 5,298.74 484.15 -96.50 5,938,490.440 675,570.071 0.36 -138.33 5,590.25 26.38 330.01 5,472.46 5,383.98 520.65 -117.90 5,938,526.432 675,547.833 0.36 -162.83 5,683.94 26.46 331.60 5,556.36 5,467.88 557.04 -138.23 5,938,562.335 675,526.660 0.76 -186.25 5,778.42 26.40 332.17 5,640.97 5,552.49 594.13 -158.05 5,938,598.951 675,505.985 0.28 -209.23 5,873.16 26.40 333.36 5,725.83 5,637.35 631.59 -177.32 5,938,635.943 675,485.842 0.56 -231.70 5,968.15 26.62 334.16 5,810.83 5,722.35 669.62 -196.07 5,938,673.523 675,466.218 0.44 -253.68 6,062.86 26.59 334.13 5,895.51 5,807.03 707.78 -214.57 5,938,711.248 675,446.838 0.03 -275.44 9/23/2016 10:43:36AM Page 5 COMPASS 5000.1 Build 81B BP Fel &0 p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 6,157.26 26.65 334.74 5,979.91 5,891.43 745.94 -232.82 5,938,748.966 675,427.703 0.30 -296.95 6,251.54 26.56 334.68 6,064.20 5,975.72 784.12 -250.86 5,938,786.709 675,408.782 0.10 -318.2, 6,346.81 26.58 335.28 6,149.41 6,060.93 822.73 -268.88 5,938,824.890 675,389.866 0.28 -339.56 6,441.57 26.64 335.95 6,234.14 6,145.66 861.39 -286.40 5,938,863.126 675,371.448 0.32 -360.39 6,535.21 26.58 335.84 6,317.86 6,229.38 899.67 -303.53 5,938,901.000 675,353.432 0.08 -380.79 6,630.03 25.22 337.24 6,403.15 6,314.67 937.66 -320.03 5,938,938.588 675,336.054 1.57 -400.53 6,725.28 22.16 339.16 6,490.37 6,401.89 973.17 -334.27 5,938,973.755 675,320.987 3.31 -417.82 6,818.59 18.72 340.39 6,577.79 6,489.31 1,003.73 -345.56 5,939,004.043 675,308.989 3.72 -431.73 6,913.79 15.46 340.76 6,668.77 6,580.29 1,030.11 -354.87 5,939,030.195 675,299.067 3.43 -443.30 7,007.43 11.88 348.06 6,759.75 6,671.27 1,051.33 -360.98 5,939,051.267 675,292.465 4.24 -451.24 7,102.96 8.16 358.29 6,853.82 6,765.34 1,067.73 -363.22 5,939,067.613 675,289.846 4.30 -454.90 7,197.22 6.26 17.57 6,947.34 6,858.86 1,079.32 -361.87 5,939,079.230 675,290.928 3.24 -454.56 7,292.01 6.22 44.97 7,041.59 6,953.11 1,087.88 -356.68 5,939,087.909 675,295.917 3.11 -450.14 7,386.21 6.90 80.25 7,135.21 7,046.73 1,092.46 -347.49 5,939,092.692 675,304.994 4.27 -441.38 7,480.69 8.29 109.88 7,228.89 7,140.41 1,091.10 -335.49 5,939,091.617 675,317.026 4.34 -429.31 7,575.47 11.25 123.11 7,322.30 7,233.82 1,083.72 -321.31 5,939,084.573 675,331.367 3.90 -414.54 7,669.43 15.29 129.46 7,413.74 7,325.26 1,070.84 -304.06 5,939,072.093 675,348.912 4.56 -396.2, 7,763.87 18.87 133.15 7,504.00 7,415.52 1,052.47 -283.30 5,939,054.218 675,370.096 3.96 -373.95 7,858.86 21.53 130.78 7,593.14 7,504.66 1,030.58 -258.89 5,939,032.900 675,395.008 2.93 -347.73 7,894.37 23.77 130.88 7,625.91 7,537.43 1,021.64 -248.54 5,939,024.203 675,405.559 6.31 -336.64 7,926.36 25.85 129.50 7,654.95 7,566.47 1,012.98 -238.29 5,939,015.788 675,416.014 6.75 -325.67 7,953.30 26.54 128.85 7,679.12 7,590.64 1,005.47 -229.07 5,939,008.494 675,425.405 2.77 -315.83 8,049.30 29.15 132.02 7,764.00 7,675.52 976.36 -194.99 5,938,980.187 675,460.153 3.12 -279.34 8,143.35 32.72 133.40 7,844.66 7,756.18 943.55 -159.49 5,938,948.216 675,496.403 3.87 -241.12 8,237.39 35.72 133.60 7,922.41 7,833.93 907.15 -121.13 5,938,912.720 675,535.593 3.19 -199.74 8,331,43 35.79 133.76 7,998.73 7,910.25 869.20 -81.39 5,938,875.708 675,576.203 0.12 -156.84 8,425.94 35.82 133.40 8,075.38 7,986.90 831.08 -41.34 5,938,838.539 675,617.131 0.23 -113.62 9/23/2016 10:43:36AM Page 6 COMPASS 5000.1 Build 81B bp BP F/.a Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Survey - - - - MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg 7.Sft--). (usft) (°) (°1 (usft) (usft) (usft) (usft)(usft) (usft) (°I100usft) 8,519.57 35.88 132.60 8,151.27 8,062.79 793.68 -1.24 5,938,802.089 675,658.093 0.50 -70.4' 8,614.63 35.09 131.87 8,228.67 8,140.19 756.59 39.61 5,938,765.960 675,699.796 0.94 -26.48 8,709.15 35.10 131.73 8,306.01 8,217.53 720.37 80.13 5,938,730.694 675,741.137 0.09 17.04 8,804.13 35.11 131.39 8,383.71 8,295.23 684.13 121.00 5,938,695.423 675,782.838 0.21 60.91 8,898.28 35.08 131.00 8,460.75 8,372.27 648.48 161.73 5,938,660.733 675,824.386 0.24 104.59 8,993.08 35.01 132.10 8,538.36 8,449.88 612.38 202.47 5,938,625.590 675,865.951 0.67 148.32 1 9,088.18 35.07133.17 8,616.22 8,527.74 575.40 242.63 5,938,589.556 675,906.967 0.65 191.56 9,164.21 35.10 133.54 8,678.44 8,589.96 545.40 274.41 5,938,560.305 675,939.431 0.28 225.83 9,196.00 36.42 134.51 8,704.24 8,615.76 532.48 287.76 5,938,547.708 675,953.083 4.52 240.26 INTERMEDIATE CASING 1 9,222.53 37.53 135.27 8,725.43 8,636.95 521.22 299.07 5,938,536.713 675,964.646 4.52 252.50 9,256.60 41.71 136.83 8,751.67 8,663.19 505.57 314.13 5,938,521.423 675,980.070 12.61 268.87 9,290.63 43.57 137.55 8,776.70 8,688.22 488.66 329.80 5,938,504.882 675,996.121 5.65 285.95 9,318.36 45.53 137.47 8,796.46 8,707.98 474.32 342.94 5,938,490.849 676,009.590 7.07 300.29 9,350.77 46.49 137.84 8,818.97 8,730.49 457.08 358.64 5,938,473.986 676,025.693 3.07 317.44 9,382.93 49.97 139.13 8,840.39 8,751.91 439.12 374.53 5,938,456.401 676,041.995 11.23 334.8: 9,412.05 52.97 139.35 8,858.53 8,770.05 421.87 389.40 5,938,439.500 676,057.263 10.32 351.15 9,448.71 57.39 140.56 8,879.46 8,790.98 398.83 408.75 5,938,416.920 676,077.145 12.36 372.44 9,477.18 60.87 140.28 8,894.06 8,805.58 380.00 424.32 5,938,398.458 676,093.146 12.25 389.59 9,507.24 64.36 141.34 8,907.89 8,819.41 359.31 441.18 5,938,378.172 676,110.483 12.02 408.19 9,540.95 68.58 142.63 8,921.34 8,832.86 334.97 460.21 5,938,354.276 676,130.069 13.00 429.26 9,571.97 72.36 143.80 8,931.71 8,843.23 311.56 477.71 5,938,331.280 676,148.109 12.69 448.74 9,601.85 75.90 144.92 8,939.88 8,851.40 288,20 494.45 5,938,308.323 676,165.389 12.38 467.45 9,635.22 79.80 146.26 8,946.90 8,858.42 261.29 512.68 5,938,281.851 676,184.439 12.33 488.15 9,665.88 83.61 146.74 8,951.33 8,862.85 236.00 529.62 5,938,256.955 676,201.764 12.52 507.04 9,696.72 87.18 147.78 8,953.80 8,865.32 210.14 546.24 5,938,231.498 676,218.983 12.05 525.85 9,728.92 89.96 148.37 8,954.61 8,866.13 182.82 563.26 5,938,204.585 676,236.634 8.83 545.19 9/23/2016 10.43:36AM Page 7 COMPASS 5000.1 Build 81B 9/23/2016 10 43.36AM Page 8 COMPASS 5000.1 Build 81B BP IeAr9 Obp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88 48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-288 Database: EDM R5K - Alaska PROD - ANCP1 9/23/2016 10 43.36AM Page 8 COMPASS 5000.1 Build 81B Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/11V Northing Easting DLeg V. Sec (usft) V) (usft) (usft) (usft) (usft) (usft) (usft) ('/100usft) (usft) 9,760.69 92.24 145.30 8,954.00 8,865.52 156.24 580.64 5,938,178.414 676,254.621 12.03 564.81 j 9,791.05 93.64 141.40 8,952.44 8,863.96 131.92 598.73 5,936,154.523 676,273.276 13.63 584.9' 9,823.65 95.33 138.03 8,949.89 8,861.41 107.13 619.74 5,938,130.232 676,294.856 11.54 608.04 9,855.03 96.45 135.58 8,946.67 8,858.19 84.38 641.10 5,938,107.983 676,316.742 8.55 631.31 9,884.84 97.69 134.18 8,943.00 8,854.52 63.50 662.06 5,938,087.604 676,338.182 6.25 654.01 9,917.10 98.74 131.76 8,938.39 8,849.91 41.74 685.42 5,938,066.394 676,362.041 8.11 679.18 9,948.93 100.26 129.13 8,933.13 8,844.65 21.38 709.31 5,938,046.593 676,386.395 9.45 704.75 9,979.17 101.17 126.41 8,927.51 8,839.03 3.18 732.80 5,938,028.949 676,410.295 9.34 729.73 10,011.92 102.34 123.42 8,920.84 8,832.36 -15.17 759.08 5,938,011.217 676,437.001 9.63 757.52 10,043.05 103.00 120.85 8,914.01 8,825.53 -31.33 784.80 5,937,995.667 676,463.084 8.33 784.54 10,073.59 103.10 117.92 8,907.11 8,818.63 -45.92 810.72 5,937,981.679 676,489.336 9.35 811.64 10,105.93 103.37 115.59 8,899.71 8,811.23 -60.09 838.83 5,937,968.167 676,517.765 7.06 840.87 10,137.42 104.16 113.08 8,892.21 8,803.73 -72.70 866.69 5,937,956.217 676,545.914 8.14 869.73 10,168.28 104.58 111.10 8,884.55 8,796.07 -83.94 894.39 5,937,945.624 676,573.865 6.36 898.30 10,201.68 104.65 109.13 8,876.12 8,787.64 -95.05 924.74 5,937,935.221 676,604.460 5.71 929.50 10,233.28 104.62 108.17 8,868.14 8,779.66 -104.83 953.71 5,937,926.122 676,633.647 2.94 959.21 10,263.10 104.52 108.28 8,860.64 8,772.16 -113.86 981.12 5,937,917.737 676,661.261 0.49 987.3' 10,295.78 101.84 109.72 8,853.19 8,764.71 -124.22 1,011.20 5,937,908.081 676,691.574 9.25 1,018.18 10,329.21 101.10 110.18 8,846.54 8,758.06 -135.40 1,042.00 5,937,897.624 676,722.620 2.59 1,049.83 10,356.99 100.44 107.60 8,841.35 8,752.87 -144.23 1,067.61 5,937,889.394 676,748.635 9.43 1,076.32 10,390.33 98.82 104.66 8,835.77 8,747.29 -153.36 1,099.39 5,937,881.004 676,780.410 9.96 1,108.57 10,422.24 97.70 101.01 8,831.18 8,742.70 -160.37 1,130.17 5.937,874.712 676,811.347 11.85 1,139.85 10,451.76 97.00 99.28 8,827.41 8,738.93 -165.53 1,158.99 5,937,870.228 676,840.276 6.28 1,169.01 10,485.38 96.40 99.49 8,823.48 6,735.00 -170.97 1,191.93 5,937,865.553 676,873.335 1.89 1,202.30 10,518.03 93.44 97.78 8,820.68 8,732.20 -175.85 1,224.09 5,937,661.421 676,905.594 10.46 1,234.76 10,546.27 90.21 96.09 8,819.78 8,731.30 -179.26 1,252.10 5,937,858.668 676,933.679 12.91 1,262.96 10,580.80 87.97 94.31 8,820.33 8,731.85 -182.39 1,286.48 5,937,856.341 676,968.120 8.29 1,297.48 9/23/2016 10 43.36AM Page 8 COMPASS 5000.1 Build 81B Casing Points BP F/,a2 b pFinal Vertical Survey Report BAKER Depth Survey Diameter HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Casing Points Measured Vertical Casing Hole Depth Survey Diameter Diameter (usft) (usft) Name (in) (in) 3,698.93 3,697.77 9 5/8" 9.625 12.250 MD Inc Azi (azimuth) TVD TVDSS NIS EM Northing Easting DLeg V. Sec (usft) V) (% (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,612.34 86.41 91.73 8,821.88 8,733.40 -184.05 1,317.94 5,937,855.414 676,999.603 9.55 1,328.9E 10,640.51 86.13 89.72 8,823.71 8,735.23 -184.41 1,346.04 5,937,855.714 677,027.708 7.19 1,356.99 10,674.79 85.91 87.72 8,826.09 8,737.61 -183.64 1,380.23 5,937,857.274 677,061.866 5.86 1,390.99 10,706.45 85.82 88.20 8,828.37 8,739.89 -182.52 1,411.79 5,937,859.132 677,093.386 1.54 1,422.32 10,735.41 86.24 89.53 8,830.38 8,741.90 -181.95 1,440.67 5,937,860.377 677,122.248 4.81 1,451.05 10,770.58 87.83 90.25 8,832.20 8,743.72 -181.88 1,475.79 5,937,861.263 677,157.356 4.96 1,486.03 10,799.60 87.85 89.25 8,833.29 8,744.81 -181.75 1,504.79 5,937,862.065 677,186.342 3.44 1,514.91 10,830.32 87.88 87.95 8,834.44 8,745.96 -181.00 1,535.48 5,937,863.530 677,217.003 4.23 1,545.41 10,862.69 86.40 87.38 8,836.05 8,747.57 -179.69 1,567.78 5,937,865.599 677,249.263 4.90 1,577.48 10,894.48 84.56 87.44 8,838.56 8,750.08 -178.25 1,599.44 5,937,867.768 677,280.876 5.79 1,608.89 10,924.74 82.77 87.01 8,841.90 8,753.42 -176.80 1,629.48 5,937,869.923 677,310.871 6.08 1,638.69 10,958.38 79.78 87.37 8,847.00 8,758.52 -175.17 1,662.69 5,937,872.326 677,344.029 8.95 1,671.63 10,989.64 78.03 86.99 8,853.01 8,764.53 -173.66 1,693.32 5,937,874.548 677,374.621 5.72 1,702.02 11,019.35 78.00 87.01 8,859.18 8,770.70 -172.14 1,722.35 5,937,876.745 677,403.598 0.12 1,730.80 11,114.55 77.90 86.39 8,879.06 8;790.58 -166.78 1,815.29 5,937,884.268 677,496.389 0.65 1,822.92 11,203.00 78.03 86.19 8,897.50 8,809.02 -161.18 1,901.62 5,937,891.874 677,582.554 0.27 1,908.4: 4 1/2" 11,203.03 78.03 86.19 8,897.51 8,809.03 -161.18 1,901.65 5,937,891.877 677,582.584 0.27 1,908.46 11,237.00 78.03 86.19 8,904.55 8,816.07 -158.97 1,934.81 5,937,894.857 677,615.679 0.00 1,941.30 Projection to TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 3,698.93 3,697.77 9 5/8" 9.625 12.250 11,203.00 41/2" 4.500 6.125 9,196.00 INTERMEDIATE CASING 1 7.000 8.500 9/23/2016 10:43:36AM Page 9 COMPASS 5000.1 Build 8 1 B BP Fel &a 1"' Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-286 Survey Calculation Method: Minimum Curvature Design: 14-288 Database: EDM R5K - Alaska PROD - ANCP1 Design Annotations Measured Vertical Local Coordinates Depth Depth +N1-S +E1-W (usft) (usft) (usft) (usft) Comment 3,617.48 3,617.03 -15.41 16.58 TIP 3,670.00 3,669.16 -16.75 22.75 KOP 3,697.81 3,696.67 -17.35 26.81 Interpolated Azimuth 11,237.00 8,904.55 -158.97 1,934.81 Projection to TO Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes 9/23/2016 10.43:36AM Page 10 COMPASS 5000.1 Build 81B STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIT 'N WELL .OMPLETION OR RECOMPLETION REPG. _. AND LOG 1 a. Well Status: Oil 0 - Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1 b. Well Class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Development 0 Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Aband.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 9/25/2016 216-014 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 9/9/2016 50-029-20708-02-00 ' 4a. Location of Well (Governmental Section): B. Date TD Reached: 16. Well Name and Number: 9/21/2016 PBU 14-28B 9 Ref Elevations KB 88.48 17. Field/Pool(s): Surface: 2342' FNL, 822' FEL, Sec. 09, T10N, R14E, UM - Top of Productive Interval: 1863' FNL, 482' FEL, Sec. 09, T10N, R14E, UM GL 41-48 • BF 42.34 PRUDHOE BAY, PRUDHOE OIL ' 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 2501' FNL, 1112' FWL, Sec. 10, T10N, R14E, UM 11159'/8888' ADL 028312 ' 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. Land Use Permit: Surface: x- 675678 - y- 5938009 ' Zone - ASP 4 11237'/8905' ' 77-043 12. SSSV Depth (MD/TVD): PO Thickness of Permafrost MD/TVD: TPI: x- 676006 y- 5938495 Zone - ASP 4 Total Depth: x- 677616 y- 5937895 Zone ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 3670'/3669' ' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES, MWD /GR/RES / DEN /NEU 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT, GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 47' 130' 47' 130' 30" 400 sx Permafrost II 13-3/8" 72# L-80 46' 2510' 46' 2510' 17-1/2" 1524 sx Arctic Set III, 400 sx AS 1 9-5/8" 47# L-80 44' 3670' 44' 3669' 12-1/4" 500 sx Class 'G', 300 sx AS 1 T' 26# L-80 3514' 1 9792, 3514' 8701' 8-1/2" 245 sx Class'G' 4-1/2" 12.6# 13Cr85 9031' 11235' 8569' 8904' 6-1/8" 264 sx Class'G' 1 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation GRADE DEPTH SET (MD) PACKER SET (MD/TV Size and Number): 4-1/2" 12.6# 13Cr85 9036' 8913'/ 8473' 2-3/4" Gun Diameter, 6 spf 9311' - 9370' 8791'- 8832' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. y 10630'- 10865' 8823-8836' RECEIVED 10930'- 10960' 8843'- 8847' (!.�" 11065'- 11130' 8869'- 8882' Was hydraulic fracturing used during completion? Yes ❑ No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed information VIV)F'LL: I I')(v 0 C T 2 1 2016 DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED D,AJE1 �A4%kq% 2200' Freeze Protect w/ 152 Bbls Diesel L �- 27. PRODUCTION TEST Date First Production: October 12, 2016 Method of Operation (Flowing, gas lift, etc.): Gas Lift Date of Test: 10/14/16 Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 17 Test Period 1017 7633 4960 82 7506 Flow Tubing 314 Press Casing Press: 1700 Calculated 24 Hour Rate Oil -Bbl: 1436 ' Gas -MCF: 10776 Water -Bbl: 7002 Oil Gravitv - API (corr): N/A Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only �,4I Na-laS11011-7 RBDMS LL OCT 2 4 2016 , 3 13.17 28. CORE DATA Conventional Core(s) Yes ❑ No B Sidewall Cores Yes ❑ No R1 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 9310' 8791' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 4453' 4434' West Sak 5932' 5779' Colville Mudstone 6491' 6278' HRZ 8124' 7828' Base of HRZ 8314' 7985' Kingak 8368' 8028' Sag River 9192' 8701' Shublik A 9214' 8719' Shublik B 9250' 8747' Shublik C 9268' 8760' SADLEROCHIT - ZONE 4B 9310' 8791' 42SB - Zone 4A 9567' 8930' Zone 46 (Invert) 9950' 8933' Shublik C 10450' 8828' Zone 4B (Revert) 10615' 8822' Formation at total depth: Zone 4B 10615' 8822' 31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Hartley, Josephine Maria Email: Josephine.Harfley@bp.com Printed Name: Joe Lastuf Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date: b 2 I INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only = 4" ClW WELLHEAD= GRAY ACTUATOR = C3W', OKB. ELEV = 71' Rff �.EV = 88.48' BF. ELEV - 42.34' KOP = 3665' Max Angle _ 105° @ 10202' Datum MD = 9468' 20" CX�ND, Datum TVD - _ $800 SS 94# H-40 D = 19.124" 13-3/8" CSG, 72#, L-80 BUTT, D = 12,3477- 19-5/8- SLB WI STOCK (09/08/16) 9-5/8" CSG, 47#, SOO-95 BTC, ID = 8.681" 14-28B 13.6' @ 99791'. -CHROME TBG ELL ANGLE > 70* & LNR� MAX I I L _J�T�;F 2022' 4-1/2" HES X NP, ID = 3.813' 110' 3514' 9-5/8" X 7" WFD LTPw/TIEBACK SLV & WFD HGK D = 6.180" ;21494'__ 3666 MILLOUT WINDOW (14-28B) 3670' - 3684' -3666' A GAS LFT MANDRELS Minimum ID = 3.725" @ 9019' 4-112" HES XN NIPPLE 7" LNR TOC (09/08/16) 1-1 ^"7696' 4-1/2"TBG,12.6#,13-CRVAMTOP, —$f .0152 bpf, D = 3.958" 7" LNR, 26#, L-80 VAM TOP/BTC—M,9192" .0383 bpf, D = 6.276" PERFORATION SUMMARY REF LOG: DRILLING LWD CNV 09/21/16 ANGLE AT TCW PERF: 45° g 9311' Nobe: Refer to Production DB for historical pert data SIZE SPF NTERVAL Opn/Sgz SHOT SOZ 2-314" 6 9311-9370 O 09/23/16 RK 2-3/4" 6 10630 - 10865 O 09/23/16 26 2-3/4" 6 10930 -10960 O 09/23/16 5 2-3/4" 6 11065 -11130 O 09/23/16 BK PBTo�—� 11169' 4-1/2" LW12,6#, 13 -CR VAM TOP,J:-11 335' .0152 bpf, D = 3.958" ST MD I TVD I DEV TYPE VLV LATCH PORT DATE 7 3463 3463 2 MMG DOME RK 16 09/28/16 6 5402 5304 26 KKBG-2 SO BK 20 09/28/16 5 6184 6003 27 KKBG-2 DMI( BK 0 09/25/16 4 6797 6557 20 KKBG-2 DMI' BK 0 09/25/16 3 7329 7079 6 KKBG-2 DMY BK 0 09/25/16 2 7820 7557 20 KKBG-2 DMY BK 0 09/25/16 1 8601 8217 35 KKBG-2 DMY BK 0 09/25/16 8886' -44-1/2* HES X NP, ID = 3.813" 8913' J 7 _X 4-1/2" HES TNT PKR D = 3.856" 8948' 4-1 t2" HES X NP, D = 3.813" 9019'-14-1/2" HES XN NP, D = 3.725" 9031' _A 7" X 5' WFD LTP w /TEBACK SLV & 9813' I I PUP JT w /RA TA G 10980' 1_J PLN JT w /RA TAG WFD HGR, D = 4.310" 9036' 4-1/2" WLEG, D = 3.958" ELMD TT LOGGED 9061' 5" X4-1/2" XO. D = 3.958" 9813' I I PUP JT w /RA TA G 10980' 1_J PLN JT w /RA TAG PRLDHOE BAY Ul`4T WELL: 14-28B PERW No: 2160140 API No= 50-029-20708-02 SEC 9, T1 OR RI 4F_ 2342' FNL & 822' FEL BP Exploration (Alaska) � ' 1 ' • . ! liiiii6_, ullll- i ! • �G�IniW�ii ! ! :! •.� i � PRLDHOE BAY Ul`4T WELL: 14-28B PERW No: 2160140 API No= 50-029-20708-02 SEC 9, T1 OR RI 4F_ 2342' FNL & 822' FEL BP Exploration (Alaska) BP AMERICA LOT / FIT Summary Well Name: 14-28B Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (ppg) (psi) (BHP) (psi) (ppg) 09/20/16 FIT 9,192.00 8,701.00 8.60 550.00 4,437.21 9.82 Page 1 of 1 North America -ALASKA - BP Operation Summary Report Page 1 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PS DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00 OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr_) - - - -- (usft) 9/4/2016 03:00 08:00 5.00 MOB P PRE BEGIN EVENT WITH PARKER RIG 272 AT 03:00 ON 9/04/16 PREPARE RIG TO MOVE TO 14-28B - PREP RIG FLOOR TO SKID AND LOWER MAST CONTINUE TO BLOW DOWN AND RIG DOWN LINES BETWEEN MODULES SKID RIG FLOOR TO CENTER LOWER MAST TO HEADACHE RACK WARM UP AND INSPECT MOVING SYSTEMS 08:00 21:00 13.00 MOB P PRE MOVE RIG MODULES FROM TARMAC PAD TO DS14: WEST DOCK RD TO OXBOW RD. OXBOW TO SPINE. SPINE TO DS14. DRILL MODULE BROKE THROUGH ROAD 1/8 MILE BEFORE INTERSECTION WITH FLOW STATION 3 ACCESS ROAD. DRILL MODULE WAS ABLE TO MAKE IT TO INTERSECTION. CONTINUE MOVING MUD MODULE TO DS14: MUD MODULE ON LOCATION AT 21:00 HRS 21:00 - 00:00 3.00 MOB N WAIT PRE MOBILIZE AND LAY RIG MATS PLACE MATS FROM FLOW STATION 3 ACCESS ROAD TO SPINE ROAD 9/5/2016 00:00 00:30 0.50 MOB N WAIT PRE MOBILIZE AND LAY RIG MATS - PLACE MATS FROM FLOW STATION 3 ACCESS ROAD TO SPINE ROAD 00:30 - 03:30 3.00 MOB P PRE MOVE DRILL MODULE AND UTILITY MODULE FROM OXBOW TO SPINE RD AND ON TO DS14. DAMAGE SEVERAL MATS ON SPINE ROAD WITH DRILL MODULE - STOP UTILITY MODULE ON SPINE ROAD -200 YDS EAST OF OXBOW INTERSECTION - CONTINUE WITH DRILL MODULE TO DS14 03:30 05:00 1.50 MOB N WAIT PRE MOBILIZE AND LAY RIG MATS PULL SEVERAL DAMAGED MATS AND INSPECT ROAD BED - MOBILIZE MATS TO DOUBLE MATAROUND WANDA LAKE TO DS14 05:00 - 0700 2.00 MOB P PRE SPOT DRILL MODULE OVER 14-28B -TOOL PUSH WITH ESD BUTTON AS RIG MOVED OVER WELL. -CONTINUE TO MOBILIZE MATS TO DOUBLE MAT AROUND WANDA LAKE TO DS14 -MOVE UTILITY MODULE ON TO DS -14 07:00 08:30 1.50 MOB P PRE SPOT UTILITY MODULE -RIG UP MUD MODULE INTERCONNECTS 08:30 10:00 1.50 MOB P PRE RIG UP ELECTRICAL INTERCONNECTS FOR UTILITY AND DRILL MODULES. Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 2 of 30 Operation Summary Report Common Well Name 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 16:00 6.00 MOB P PRE CONTINUE WITH MIRU. -HOLD PRE -JOB FOR RAISING DERRICK -RAISE DERRICK 540K OFF THE DERRICK STAND. { -SLIDE HA WALKWAY -BRIDAL D -UNTIE SE -RIG UP F MUD,CEM � RIG UP M IFLUID,CA 16:00 - 17:00 1.00 RIGU P PRE RIG ACCE -HOLD PR _ 17:00 18:00 1.00 RIGU P PRE OFFLOAD 18:00 18:30 PRE HOLD RIG 0.50 RIGU P -H2S DRIL -ALLACC MINUTES. -HOLD AAF 1.00 RIGU P PRE CLEAN RI 18:30 19:30 i -PERFORM HUNT. 19:30 21:00 1.50 BOPSUR P PRE TEST BPV -250 PSI L - -BLOW DO PRE NIPPLE DO 21:00 - 22:00 1.00 BOPSUB P -SUCK FL -CAMERON 22:00 22:30 0.50 FROM VOI PRE SERVICE BOPSUR P EQUIPME 22:30 - 00:00 1.50 BOPSUR P PRE FUNCTION -MAKE UP -CLEAN TH CROSSOV -9 TURNS 00:00 - 05:00 5.00 BOPSUR P 9/6/2016 PRE NIPPLE UP -MAKE UP DERRICK. BOPSUR P 05:00 05:30 0.50 PRE HOLD EVA CONDUC UNCH INTO POSITION,SET SAND INSTALL HANDRAILS. OWN,TIE LINES IN DERRICK. RVICE LOOP AND KELLY HOSE LOOR,HANG TONGS,CONNECT ENT AND BLEEDER LINES. UD MODULE.,TAKE ON LIBRATE PITS. PT 16:00 9-5-2016 E -SPUD MEETING. FLUID TO PITS. EVACUATION DRILL. L. OUNTED FOR IN MUSTER AREA 5 WITH CREW. - G. AFTER MAINTENANCE HAZARD OW,3500 PSI HIGH. PASSING TEST WN SURFACE LINES. WN TREE UID FROM TREE REP. BLEED OFF PRESSURE D. TOP DRIVE AND RIG FLOOR NT TEST LOCK DOWNS. CROSS OVER TO HANGER. READS ON HANGER AND ER. TO MAKE UP CROSSOVER. BOPE 4" DRILLPIPE AND RACK IN CUATION DRILL WITH CREW - - — T PRE -SPUD MEETING 05:30 - 06:30 1.00 BOPSUR P PRE TEST BOPE -RIG UP 7" TEST JOINT -ATTEMPT TO SCREW CROSSOVER INTO HANGER -CROSSOVER THREADS DAMAGED __ __ _ -SWAP TO DONUT TEST JOINTS. 06:30 08:00 1.50 BOPSUR P f PRE RIG EVACUATION DRILLAND PRE -SPUD MEETING 08:00 10:00 2.00 BOPSUR P PRE SIN ALL TEST JOINTS TO DRY LOCATE ALL RAMS AND ANNULAR. -RIG UP 7' TEST JOINT, FILLAND BLEED AIR FROM SYSTEM. -PERFORM BODY TEST OF BOP Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* M' North America -ALASKA - BP Page 3 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 11:00 1.00 BOPSUR P PRE TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 7", 4-1/2" AND 4" TEST JOINTS -CHART FOR 5 MINUTES TEST ALARMS AND FLOW SHOW. -TEST WITNESS WAIVED BY CHUCK SCHIEVE -HCR KILL FAILURE 11:00 - 13:30 2.50 BOPSUR N RREP -1.07 PRE REPLACE HCR KILL IBLOW DOWN KILL LINE -REMOVEAND REPLACE HCR 13:30 - 18:00 4.50 BOPSUR P f PRE TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 7", 4-1/2" AND 4" TEST JOINTS -CHART FOR 5 MINUTES -TEST ALARMS AND FLOW SHOW. - --- — -TEST WITNESS WAIVED BY CHUCK SCHIEVE 118:00 - 19:30 1.50 BOPSUR P PRE LAY DOWN TEST JOINTS -RIG UP DUTCH RISER -SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 19:30 - 20:00 0.50 RIGU P PRE RIG UP LUBRICATOR AND TEST TO 250 PSI LOWAND 3500 PSI HIGH. 5 MIN 20:00 - 21:30 1.50 RIGU P PRE PULL TEST DART DRAIN STACK -MAKE UP PULLING TOOL TO T BAR -COULD NOT LATCH INTO SLOT WITH TOOL 21:30 23:30 2.00 RIGU N SFAL -1.07 PRE PULL TEST DART -MOBILIZE MAGNET TO DRILL FLOOR AND 'MAKE UP TO 4" DRILLPIPE t I RETRIEVE DART ON SECOND ATTEMPT. -LAY DOWN MAGNET. 23:30 00:00 0.50 RIGU P PRE MAKE UP LUBRICATOR TO DUTCH RISER -TEST BREAK WITH QUICK TEST SUB TO 3500 PSI. -PULL BPV 9/7/2016 00:00 03:30 3.50 WHIP P DECOMP CIRCULATE OUT FREEZE PROTECT. -CIRCULATE 300 BBLS SEAWATER WITH _ BARAKLEAN 03:30 - 05:30 2.00 WHIP N SFAL -1.07 DECOMP SPEAR TUBING HANGER -MAKE UP SPEAR AND ATTEMPT TO SPEAR HANGER -SEVERAL ATTEMPTS PACKOFF APPEARS TO BE HANGING UP. 05:30 08:30 3.00 WHIP N SFAL -1.07 DECOMP WAIT ON SPEAR -INSTALL STRIP-O-MATIC CYLINDER AND FUNCTION TEST -BUILD 24 STANDS OF 4" DRILLPIPE. 08:30 - 10:00 1.50 WHIP P -1.07 DECOMP MAKE UP NEW SPEAR -ENGAGE SPEAR AND PULL HANGER TO DRILL FLOOR. -182K TO MOVE, 82K PU WT. -MOVE SLOWLY TROUGH THE BOP DUE TO TIGHT TOLERANCE. 10:00 - 12:00 2.00 WHIP P -1.07 DECOMP RIG UP TO PULL TUBING -BREAK OUT HANGER -RELEASE SPEAR AND LAY OUT -LAY DOWN HANGER. -RIG UP SPOOLING UNITAND TONGS. CHANGE OUT ELEVATORS. Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task - _ (hr) 12:00 - 16:00 4.00 WHIP Page 4 of 30 Code NPT NPT Depth Phase Description of Operations (usft) P -1.07 DECOMP PULL 4-1/2" TUBING FROM CUT AT 4021' -MONITOR WELL FOR 10 MINUTES, STATIC. -PU WT 77K,SO WT 74K @4021' -LAID DOWN 99 JOINTS 4 1/2" TUBING -1 GAS LIFT MANDREL -1 SSSV Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths` -1 CUT JOINT 3'11" -RECOVERED 66 SS BANDS. 16:00 - 18:30 2.50 WHIP P -1.07 DECOMP RIG DOWN DOYON CASING -CAMERON CHECKED LOCK DOWNS FOR CASING GROWTH. NO INDICATION OF CASING GROWTH. 18:30 21:00 2.50 WHIP N WAIT -1.07 DECOMP WAIT ON E -LINE -BUILD 4" DRILLPIPE STANDS AND RACK IN DERRICK. 21:00 00:00 3.00 WHIP P -1.07 DECOMP RUN 8-1/2" GAUGE RING JUNK BASKET ON SLB E -LINE TO 41 00'MD -HOLD PJSM WITH E -LINE CREW AND RIG TEAM -RU E -LINE WITH NO PRESSURE CONTROL, ONLY INTEGRAL LINE WIPER AND CUTTER APPROVED BY WSUP PER 100204 SECTION 5.4.1.5 -LOAD TOOLS TO RIG FLOOR AND MAKEUP TOOL STRING -RUN GAUGE RING JUNK BASKETASSEMBLY TO 4100' MD -POOH WITH E -LINE AND LD TOOLS -RECOVERED 2 STAINLESS STEEL BANDS AND ASSORTED RUBBER 9/8/2016 00:00 03:00 3.00 WHIP P DECOMP RUN AND SET EZSV -PJSM WITH SLB AND RIG CREWS. -LOAD CHARGE AND EZSV -RIH AND LOG ON DEPTH -SET CENTER ELEMENT 4' ABOVE COLLAR @ 3689' -TOP OF PLUG @3687.5 03:00 - 04:00 1.00 WHIP P DECOMP TEST EZSV -250 PSI LOW 5 MIN. -3500 PSI HIGH 30 MIN. -LOST 17 PSI FIRST 15,6 PSI FOR SECOND 15 MIN. -WSUP APPROVAL TO PROCEED -SEE ATTACHED TEST CHART AND WELLBORE TESTING CRITERIA CALCULATOR 04:00 07:00 3.00 WHIP P DECOMP CHANGE OUT TUBING SPOOLAND PACK -OFF -OA MONITERED FOR 3 X ESTIMATED TIME FOR CHANGEOUT.(STATIC) -PJSM FOR NIPPLE DOWN BOP'S -DRAIN BOP -REMOVE TUBING SPOOL -REPLACE PACK -OFF -BUILD 4" DRILL PIPE STANDS 07:00 - 08:00 1.00 WHIP P DECOMP INSTALL PACK OFFAND RUN IN LOCK DOWN SCREWS -ORIENTATE AND SET NEW TUBING SPOOL ON WELL HEAD -MOVE BOP BACK ON TO NEW SPOOLAND NIPPLE UP. -CONTINUE TO BUILD STANDS OFF LINE Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths` North America - ALASKA - BP Page 5 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 09:30 1.50 WHIP P DECOMP PRESSURE TEST -TEST 9 5/8" PACK OFF 250 PSI LOW 15 MIN,3500 PSI HIGH 15 MIN -TEST APPROVED BY WSUP 09:30 10:30 1.00 WHIP P DECOMP PRESSURE TEST BOPE BREAKS -250 PSI LOW/ 3500 PSI HIGH FOR 5 MIN EACH. 10:30 11:00 0.50 WHIP P DECOMP BLOW DOWN MUD LINES -INSTALL 8 15/16" WEAR RING. 11:00 12:00 1.00 WHIP P WEXIT MAKE UP WHIPSTOCK ASSEMBLY -CLOSE BLIND RAMS -SET WHIPSTOCK IN SLIPS -PICK UP TRI -MILL ASSEMBLY AND PIN TO WHIPSTOCK -OPEN BLIND RAMS -MAKE UP FLOAT SUB AND 1 JT 5: HWDP 12:00 14:00 2.00 WHIP P WEXIT RIH WITH WHIPSTOCK -RIH ON ELEVATORS,EASY IN AND OUT OF SLIPS. -SHALLOW TEST MWD @ 900',GOOD TEST. 14:00 15:30 1.50 WHIP P WEXIT RIH WITH WHIPSTOCK FROM 900' TO 3650' -PICK UP WT 124K,SLACK OFF WT 128K ---- - - ---- - -- --1: @3560' 15:30 - 16:00 0.50 STWHIP P WEXIT ORIENT WHIPSTOCK TO 60 DEG LEFT OF HIGHSIDE. -SET WHIPSTOCK SET DOWN 58K TO SHEAR, PU TO VERIFY. 16:00 17:00 1.00 STWHIP P WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER TO 9.6 PPG MILLING FLUID. -400 GPM @ 800 PSI. 17:00 00:00 7.00 STWHIP P WEXIT MILL 8.5" WINDOW FROM 3670' TO 3697'MD -400 GPM,905 PSI ON BOTTOM 840 PSI OFF -95 RPM,3KTORQUE ON BOTTOM,2K TORQUE OFF -WOB 3-5K -PU WT 124K,SO WT 128K, ROTATING WT 122K -MUD WT 9.6 PPG IN AND OUT. -TOW 3670', BOW 3684' 9/9/2016 00:00 01:00 1.00 STWHIP P WEXIT DRILL 8-1/2" INTERMEDIATE HOLE 3697 TO 3704' WITH TRI -MILL ASSEMBLY -400 GPM, 908 PSI ON BOTTOM, 885 PSI OFF -95 RPM, 2K FT -LBS TORQUE ON BOTTOM, 1K FT -LBS TORQUE OFF -WOB 7-8K LBS -PU WT 123K, SO WT 122K, ROTATING WT 122K -MUD WT 9.6 PPG IN AND OUT 01:00 01:30 0.50 STWHIP P WEXIT CIRCULATE 1-1/2 TIMES BOTTOMS UP -400 GPM, 1050 PSI -95 RPM, 1-2 K FT -LBS TORQUE -PUMP 35 BBL HI -VIS SWEEP SURFACE TO SURFACE, MINIMAL INCREASE IN CUTTINGS -UNANNOUNCED KICK WHILE DRILLING DRILL AFTER FIRST BOTTOMS UP -WELL SHUT IN 4 MIN FROM START OF SIMULATED INFLUX -HOLD AAR WHILE CIRCULATING 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 6 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00.00AM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 03:00 1.50 STWHIP P WEXIT POOH ON ELEVATORS FROM 3704' TO 854' *All depths reported in Drillers Depths* -MONITOR WELL FOR 10 MINUTES ON BOTTOM, STATIC -MUD WT IN AND OUT 9.6 PPG I -PU WT 122K, SO WT 120K AT 3660' 03:00 04:00 1.00 STWHIP P WEXIT LAY DOWN BHA -MONITOR WELL FOR 10 MINUTES, STATIC -HOLD PREJOB SAFETY MEETING -RACK BACK 5 STANDS 5" HWDP -RACK IN DERRICK 3 STANDS NMDC -LAY DOWN MWD, 1 JT HWDP, AND FLOAT SUB -GAUGE AND LAY DOWN TRI MILLASSEMBLY -LOWER MILL 3/8" UNDER, MIDDLE MILL 3/8", UNDER UPPER MILL 3 /16" UNDER -MILL GAUGE WITHIN SLB SPECIFICATIONS 04:00 05:30 1.50 DRILL P INT1 CLEAN AND CLEAR RIG FLOOR -WASH BOPE. WORK VALVES AND RAMS TO CLEAN MILLING DEBRIS 05:30 08:00 2.50 DRILL P INT1 MAKE UP 8-1/2" DRILLING ASSEMBLY -PJSM WITH BAKER DD / MWD AND DRILL CREW -MAKE UP 8-1/2" BIT -RE-SHIM MUD MOTOR -SCRIBE TOOLS -PICK UP FLEX COLLARS, JARS AND HWDP 08:00 09:30 1.50 DRILL P INTI RIH WITH DRILLING BHA FROM 921' TO 3704' -FILL PIPE EVERY 2000' -SHALLOW HOLE TEST TOOLS AT 1867' -ORIENT MOTOR TO 60° LEFT OF HIGHSIDE PRIOR TOP EXIT WINDOW 09:30 18:00 8.50 DRILL P INT1 DIRECTIONAL DRILL 8-1/2" INTERMEDIATE HOLE FROM 3707' TO 4118' -411' IN 8.5 HRS = 48.3 FPH WITH CONNECTIONS AND SURVEYS -INSTANTANEOUS ROP = 40-150 FPH -500 GPM, 1340 PSI ON, 1160 PSI OFF -65 RPM, 2K FT -LBS TORQUE ON AND 2K FT -LBS TORQUE OFF BOTTOM -WOB 17K LBS -PU WT 124K, SO WT 121 K, ROTATING WT 117K -NO BACKREAMING AT CONNECTIONS -SURVEY EVERY 30' DUE TO DOGLEGS >5°/100 -MUD WT IN AND OUT 9.6 PPG 18:00 18:30 0.50 DRILL P INT1 SERVICE TOPDRIVE AND RIG FLOOR EQUIPMENT 18:30 00:00 5.50 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 4118' TO 4520' -402' IN 5.5 HRS = 73.1 FPH WITH CONNECTIONS AND SURVEYS -INSTANTANEOUS ROP = 60-150 FPH -500 GPM, 1340 PSI ON, 1160 PSI OFF -65 RPM, 2K FT -LBS TORQUE ON AND 2K FT -LBS TORQUE OFF BOTTOM -WOB 17K LBS -PU WT 124K, SO WT 121 K, ROTATING WT 117K -NO BACKREAMING AT CONNECTIONS -SURVEY EVERY 90' -MUD WT IN AND OUT 9.6 PPG *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 7 of 30 Common Well Name: 14-28 AFE No X3 -017TH -C: (5,639,281.00) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations -� (usft) 9/10/2016 00:00 - 03:00 3. 00 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 4520' TO 4700' MD (4666' TVD) - 180' IN 3 HRS = 60 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 30-200 FPH 500 GPM, 1795 PSI ON, 1575 PSI OFF 65 RPM; 3K TORQUE ON, 2K TORQUE OFF 20K WOB - PU 135K, SO 125K, ROT 126K NO BACKREAMING AT CONNECTIONS SURVEY EVERY -90' MUD WT IN AND OUT 9.6 PPG SPR; 4700' MD, 4666' TVD MP1 :30/40 SPM 255/328 PSI MP2 : 30/40 SPM 254/323 PSI 03:00 - 04:30 1.50 DRILL P INT1 CIRCULATE WELL CLEAN, 1.5 BOTTOMS UP -500 GPM; 1560 PSI - PUMP 35 BBL HIGH -VIS SWEEP RECIPROCATE PIPE 90' WHILE CIRCULATING PUMPED 35 BBL HIGH -VIS WITH 50% INCREASE IN CUTTINGS NOTED AT SHAKERS 04:30 05:00 0.50 DRILL P INT1 PULL OUT OF HOLE FROM 4700' TO 4229' MD FLOW CHECK WELL FOR 10 MIN, STATIC PULL FIRST STAND ON ELEVATORS, INDICATIONS OF SWABBING - PUMP NEXT 5 STANDS OUT OF HOLE TO 4229' - 200 GPM, 460 PSI INDICATIONS OF SWABBING FLOW CHECK WELL FOR 10 MIN, MUD OUT OF BALANCE 05:00 05:30 0.50 DRILL P INT1 RUN IN HOLE FROM 4229' TO 4700' MD DECISION MADE TO INCREASE MUD WEIGHT TO 9.8 PPG DUE TO MUD OUT OF BALANCE RIH ON ELEVATORS 05:30 - 08:30 3.00 DRILL P INT1 CIRCULATE WELL TO 9.8 PPG LSND, 7.5 BOTTOMS UP 500 GPM, 1500 PSI 65 RPM, 2K TORQUE RECIPROCATE PIPE 90' WHILE CIRCULATING MUD WEIGHT 9.8 PPG IN/OUT SPR; 4700' MD, 4666' TVD MP1 : 30/40 SPM 247/317 PSI MP2: 30/40 SPM 246/315 PSI 08:30 - 09:30 1.00 DRILL P INT1 MONITOR WELLAND WAIT ON PLAN FORWARD Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths` North America -ALASKA - BP Page 8 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3-017TH-C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) — 09:30 10:30 1.00 DRILL �P INT1 _ CIRCULATE BOTTOMS UP 500 GPM, 1500 PSI 65 RPM, 2K TORQUE MONITOR FLOW AT 3" LINE TO TRIP TANK - WAIT 15 MIN TO ALLOW FLOWBACK TO STABILIZE MEASURE TIME TAKEN TO FILL 1QT JUG -WELL CONTINUING TO FLOW AT 1.4 BPH MUD CHECK SHOWS INCREASE IN CHLORIDES FROM 800 TO 1250 PPM DISCUSS WITH ODE, WSUP AND WOM. I FLOW CONDITIONS BELIEVED TO BE THE RESULT OF CRETACEOUS OVERPRESSURE FROM NEARBY DISPOSAL WELLS (SECT 1.2 - KEY RISKS IN WELL PROGRAM). DECISION MADE TO INCREASE MUD WEIGHT TO 10.0 PPG PER OCN #1. 10:30 - 13:30 3.00 DRILL P INT1 CIRCULATE WELL TO 10.0 PPG LSND, 2 BOTTOMS UP 500 GPM; 1555 PSI 65 RPM; 2.5K TORQUE RECIPROCATE PIPE 90' WHILE (CIRCULATING MUD WEIGHT 10.0 IN/OUT FLOW CHECK WELL FOR 10 MIN AFTER 10.0 PPG MUD ALL THE WAYAROUND. WELL STATIC. 13:30 14:30 1.00 DRILL P INT1 PULL OUT OF HOLE WITH 8-1/2" DRILLING BHA ON ELEVATORS FROM 4700' TO 921' MD PU 133K, SO 127K AT 4700' MD FLOW CHECK WELL FOR 15 MIN AT SHOE, STATIC PUMP DRY JOB AT SHOE 14:30 18:30 4.00 DRILL P INTI PULLAND LAY DOWN 8-1/2" MOTOR DRILLING ASSEMBLY i I STAND BACK 5" HWDP LAY DOWN COLLARS, MWD AND MOTOR DULL BIT GRADE: 1 - 1 - WT - A - E - 1 - NO - kO.50 BHA 18:30 19:00 I! DRILL P INT1 - CLEAN AND CLEAR RIG FLOOR 19:00 21:00 2.00 DRILL P INT1 PICK UP AND MAKE UP 8-1/2" RSS INTERMEDIATE DRILLING ASSEMBLY 8-1/2" HALLIBURTON MM65D BIT AUTOTRAK W/ NEAR BIT GAMMAAND ONTRAK PU 78K, SO 78KAT 889' MD SHALLOW HOLE TEST AT 889' MD, GOOD TEST 21:00 - 23:30 2.50D RILL P� I INT1 RUN IN HOLE WITH 8-1/2" RSS INTERMEDIATE DRILLING ASSEMBLY ON ELEVATORS FROM 889' TO 4617' MD FILL PIPE EVERY 2000' PU 132K, SO 122K TRIPPING LIMITS 150 FPM IN CASED HOLE L— 75 FPM IN OPEN HOLE Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths` North America - ALASKA - BP Page 9 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI' 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ' 23:30 - 00:00 0.50 DRILL P INT1 WASH DOWN FROM 4617 TO 4700' MD 400 GPM; 1150 PSI 60 RPM, 2K TORQUE CORRELATE LOGS DUE TO CHANGE IN MWD SPR; 4700' MD, 4666' TVD Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* MP1 : 30/40 SPM 315/390 PSI i MP2: 30/40 SPM 305/385 PSI 9/11/2016 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-1/2" INTERMEDIATE HOLE FROM 4700' TO 5210' MD 510' IN 6 HRS = 85 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 100-200 FPH 525 GPM; 2050 PSI ON, 1990 PSI OFF 150 RPM; 5K TORQUE ON, 3K TORQUE OFF 10-15K WOB PU 145K, SO 126K, ROT 128K NO BACKREAMING AT CONNECTIONS MUD WT 10.0 PPG IN/OUT ECD: ACTUAL = 10.8 PPG, CALC = 10.8 PPG SURVEY EVERY - 90' 06:00 - 12:00 6.00 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 5210' TO 5675' MD (5549' TVD) 465' IN 6 HRS = 77.5 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 50-180 FPH 525 GPM; 2200 PSI ON, 2130 PSI OFF 150 RPM, 4K TORQUE ON, 3K TORQUE OFF 10-15K WOB PU 156K, SO 127K, ROT 127K NO BACKREAMING AT CONNECTIONS MUD WT 10.0 PPG IN/OUT ECD: ACTUAL= 10.7 PPG, CALC = 10.7 PPG - SURVEY EVERY - 90' 12:00 - 18:00 6.00 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 5675' TO 6260' MD (6072' TVD) - 585' IN 6 HRS = 97.5 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 60-150 FPH 525 GPM; 2270 PSI ON, 2270 PSI OFF 150 RPM; 5K TORQUE ON, 5K TORQUE OFF 10-15K WOB PU 162K, SO 134K, ROT 138K NO BACKREAMING AT CONNECTIONS MUD WT 10.0 PPG IN/OUT ECD: ACTUAL= 10.9 PPG, CALC = 10.7 PPG SURVEY EVERY- 90' SPR; 6191' MD, 6009' TVD MP1 : 30/40 SPM 320/400 PSI MP2: 30/40 SPM 310/390 PSI 18:00 18:30 0.50 DRILL P INT1 SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America -ALASKA - BP Page 10 or 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3-017TH-C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 00:00 5.50 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 6260' TO 6761' MD (6590' TVD) 585' IN 5.5 HRS = 91.1 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 60-150 FPH 525 GPM, 2250 PSI ON, 2480 PSI OFF 150 RPM; 7K TORQUE ON, 6K TORQUE OFF 10-15K WOB PU 175K, SO 138K, ROT 145K BACKREAM AS NEEDED FOR ECD 'MANAGEMENT MUD WT 10.0 PPG IN/OUT ECD: ACTUAL= 11.0 PPG, CALC = 10.7 PPG SURVEY EVERY - 90' ACTUAL ROTATE TIME 17.9 HRS 9/12/2016 00:00 12:00 12.00 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 6761' TO 7611' MD (7353' TVD) - 850' IN 12 HRS = 70.8 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 40-150 FPH 550 GPM, 3055 PSI ON, 2935 PSI OFF 150 RPM; 8K TORQUE ON, 6K TORQUE OFF 10-15K WOB PU 175K, SO 148K, ROT 158K BACKREAM AS NEEDED FOR ECD MANAGEMENT MUD WT 10.2 PPG IN/OUT ECD: ACTUAL= 11.3 PPG, CALC = 10.7 PPG SURVEY EVERY - 90' BLENDED 300 BBLS OF 11.0 PPG LSND SPIKE FLUID INTO SYSTEM TO WEIGHT UP TO 10.2 PPG PRIOR TO ENTERING CMI AT 7717' MD. PUMPED 35 BBL HIGH VIS SWEEP AT: 6860' MD; 50% INCREASE IN CUTTINGS 7330' MD; 30% INCREASE IN CUTTINGS SPR; 6856' MD, 6610' TVD, MUD WT 10.0 PPG MP1 : 30/40 SPM 325/415 PSI MP2 : 30/40 SPM 315/410 PSI Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 11 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14 -28 -Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - - (usft) 1200 18:00 6.00 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 7611' TO 7910' MD (7640' TVD) 299' IN 6 HRS = 49.8 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 20-100 FPH 550 GPM; 3149 PSI ON, 3148 PSI OFF 150 RPM; 8K TORQUE ON, 7K TORQUE OFF 10-15K WOB PU 200K, SO 150K, ROT 161 K BACKREAM AS NEEDED FOR ECD MANAGEMENT MUD WT 10.2 PPG IN/OUT ECD: ACTUAL= 11.3 PPG, CALC = 10.7 PPG SURVEY EVERY - 90' PUMPED 35 BBL HIGH VIS SWEEP AT: - 7755' MD; MINIMAL INCREASE IN CUTTINGS SPR; 7610' MD, 7356' TVD, MUD WT 10.2 PPG MP1 : 30/40 SPM 340/430 PSI MP2 : 30/40 SPM 330/440 PSI 18:00_ 18:30 0.50 DRILL - P INTI SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 18:30 00:00 5.50 DRILL P INT1 DRILL 8-1/2" INTERMEDIATE HOLE FROM 7910' TO 8230' MD (7910' TVD) 320' IN 5.5 HRS = 58.1 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 20-100 FPH 550 GPM; 3396 PSI ON, 3369 PSI OFF 150 RPM; 7K TORQUE ON, 6K TORQUE OFF 10-15K WOB PU 200K, SO 150K, ROT 161 K BACKREAM AS NEEDED FOR ECD MANAGEMENT MUD WT 10.5 PPG IN/OUT ECD: ACTUAL = 11.6 PPG, CALC = 11.1 PPG SURVEY EVERY - 90' BLENDED 450 BBLS OF 11.1 PPG LSND SPIKE FLUID (W/ BLACK PRODUCTS) INTO SYSTEM TO WEIGHT UP TO 10.5 PPG AND INCORPERATE BLACK PRODUCTS PRIOR TO ENTERING HRZ. Printed 10/10/2016 9:38:25AM "All depths reported in Drillers Depths* North America - ALASKA - BP Page 12 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:00AM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - (usft) 9/13/2016 00:00 06:00 6.00 DRILL P INT1 DIRECTION DRILL DRILL 8-1/2" INTERMEDIATE - --- -- - 06:00 - 15:00 HOLE FROM 8230' TO 8541' MD - 311' IN 6 HRS = 52 FPH WITH CONNECTIONS AND SURVEYS INSTANTANEOUS ROP = 50-80 FPH 525 GPM; 3385 PSI ON, 3340 PSI OFF 150 RPM, 8K TORQUE ON, 6K TORQUE OFF 10-15K WOB PU 201 K, SO 152, ROT 164K BACKREAM AS NEEDED FOR ECD MANAGEMENT MUD WT 10.7 PPG IN/OUT ECD: ACTUAL = 11.6 PPG, CALC = 11.2 PPG SURVEY EVERY - 90' SOFTSPEED ACTIVATED AT 01:00 TO COMBAT STICK SLIP SPR; 8460' MD, 8103' TVD, MUD WT 10.7 PPG MP1 : 30/40 SPM 360/480 PSI MP2 : 30/40 SPM 360/470 PSI 9.00 DRILL P INT1 DIRECTIONAL DRILL 8-1/2" INT HOLE FROM 8541' MD TO 8962' MD IN KINGAK SHALE (421' IN 9 HRS = 47 FPH WITH CONNECTIONS. INSTANTANEOUS ROP = 50-70 FPH FOR ECD CONTROL (11.7 PPG HARDLINE) 525 GPM, 3425-3550 PSI, 130-150 RPM, 8-9 FT -LBS TRQ ON BTM, 7-9 KFT-LBS TRQ OFF BTM, 6-12 KLBS WOB MW IN/OUT = 10.7 PPG ECD ACTUAL= 11.6-11.7 PPG, CALCULATED CLEANHOLE = 11.3 PPG NO LOSSES WHILE DRILLING AHEAD SURVEY EVERY CONNECTION NO BACKREAMING AT CONNECTIONS PUMP 40 BBL HI -VIS SWEEP AT 8465' MD WITH NO INCREASE IN CUTTINGS. OBSERVE -200 PSI PRESSURE DROP FROM 8900' AT 13:00 TO 8962' MD AT 15:00. TROUBLESHOOT SURFACE SYSTEM AND DISCOVER WASHOUT IN MUD PUMP #2 SUCTION POD. 15:00 - 18:00 3.00 DRILL N SFAL 8,962.00 INT1 MUD PUMP MAINTENANCE - CHANGE OUTALL VALVES AND SEATS ON MUD PUMP #2 - 390 GPM, 2100 PSI, 145 RPM, 7-8 KFT-LBS TRQ, RECIPROCATING 30' STROKES SERVICE AND LUBRICATE RIG, 18:00 19:00 1.00 DRILL P INT1 DIRECTIONAL DRILL 8-1/2" INT HOLE FROM 8962' MD TO 8985' MD IN KINGAK SHALE. OBSERVE LOOSE CAP ON MUD PUMP #2 SUCTION POD. STOP DRILLING TO TIGHTEN. - 520 GPM, 3525 PSI, 120 RPM, 9-10 KFT-LBS TRQ ON BTM, 8 KLBS WOB - CONTROL DRILL WITH CONSTANT WOB AND ROP. OBSERVE TJB MARKER ON NEARBIT GR AT 8960' MD, 8511' TVD (19' LOW). PROJECT FORWARD TO EXPECTED TSGR AT 9183' MD, 8693' TVD (182' TVD ISOCHORE) Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 13 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 19:30 0.50 DRILL N SFAL 8,985.00 INT1 TIGHTEN CAP ON MUD PUMP #2 SUCTION POD. - PERFORM WEEKLY BOPE FUNCTION TEST ON LOWER PIPE RAMS, ANNULAR PREVENTER AND HCRS (UPPER RAMS AND BLIND RAMS TO BE TESTED WHEN ON SURFACE). 19:30 23:30 4.00 DRILL P INT1 DIRECTIONAL DRILL 8-1/2" INT HOLE IN KINGAK SHALE FROM 8985' MD TO 9187' MD, 8697' TVD (202' IN 4 HRS = 51 FPH WITH CONNECTIONS) - CONTROL DRILL WITH 70 FPH CONSTANT ROP - 525 GPM, 3580 PSI, 120 RPM, 9 KFT-LBS TRQ ON BOTTOM, 7 KFT-LBS TRQ OFF BOTTOM, 5-15 KLBS WOB - SURVEY EVERY CONNECTION MW IN/OUT = 10.7 PPG NO LOSSES WHILE DRILLING AHEAD ECD ACTUAL= 11.6-11.7 PPG, CALCULATED CLEANHOLE = 11.3 PPG ACTUAL DRILLING TIME FOR THE FULL 24 HR REPORTING PERIOD = 17 HRS REACH MAX ALLOWABLE DRILL DEPTH OF 9187' MD PER CASING PICK PROCEDURE WITH NO REVERSE DRILLING BREAK OBSERVED. BEGIN SCRATCH AND SNIFF STRATEGY. SPR; 9122' MD, 8644' TVD, MW 10.7 PPG MPI : 30/40 SPM 370/510 PSI - — MP2 : 30/40 SPM 365/505 PSI 23:30 00:00 0.50 DRILL P INT1 CIRCULATE SAMPLES UP TO CONFIRM PRESENCE OF SAG RIVER - 520 GPM, 3500-3550 PSI, 120 RPM, 8 KFT-LBS TORQUE, RECIPROCATING 50' STROKES - SEE DETAILS OF TD CONFIRMATION IN FIRST TIME ENTRY ON 9/14 REPORT. 9/14/2016 00:00 - 03:30 3.50 DRILL P INT1 DRILL 8-1/2" INT HOLE AND CIRCULATE UP SAMPLES FROM 9187' TO HOLE SECTION TO AT 9197' MD, 520 GPM, 3475-3525 PSI, 120 RPM, 7-9 KFT-LBS TRQ, RECIPROCATING 50' STROKES (DURING CIRCULATING UP SAMPLES) NO LOSSES, MW IN/OUT = 10.7 PPG CIRCULATE UP SAMPLES IN 5' MD INTERVALS AT 9187' MD (NO SAG RIVER SIGNS), 9192' MD (NO SAG RIVER SIGNS), 9197' MD (SAG RIVER SAND CLUSTERS AND GLAUCONITE). OBSERVE -2' REVERSE DRILLING BREAK (60 FPH TO 25 FPH) AT 9193' MD. ESTIMATED TOP OF SAG RIVER = 9195' MD, 8704' TVD (11' DEEPER THAN PLANNED ISOCHORE). PLANNED LINER SET DEPTH = 9195' MD. Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 14 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. LIN: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 05:30 2.00 DRILL P INT1 COMPLETE CIRCULATING HOLE CLEAN AT 9197 MD SECTION TD WITH 9 TOTAL BOTTOMS UP (INCLUDING SCRATCH AND SNIFF) - 520 GPM, 3400-3450 PSI, 120 RPM, 7-9 TRQ, RECIPROCATING 50' STROKES CIRCULATE 40 BBL HINIS SWEEP SURFACE TO SURFACE WITH NO INCREASE IN RETURNS MW IN/OUT = 10.7 PPG ECD ACTUAL= 11.5 PPG INITIAL, 11.4 PPG FINAL, CALCULATED CLEANHOLE = 11.3 PPG NO LOSSES WHILE CIRCULATING FLOWCHECK WELL FOR 10 MIN AFTER PUMPS DOWN PRIOR TO PULLING OFF BOTTOM (STATIC) 05:30 07:30 2.00 DRILL P INT1 SHORT TRIP FROM SECTION TD: PUMP OUT OF THE HOLE THROUGH THE SHALES WITH 8-1/2" DRILLING ASSEMBLY FROM TD AT 9197' MD TO TOP OF HRZ AT 8124' MD 1 BPM, 115 PSI 40 FPM PULLING SPEED NO HOLE ISSULES INITIAL PICKUP WEIGHT OFF BOTTOM WITH _ PUMPS ON = 225 KLBS 07:30 09:00 1.50 DRILL P INT1 SHORT TRIP FROM SECTION TD: PULL OUT OF HOLE WITH 8-1/2" DRILLING ASSEMBLY FROM TOP OF HRZ AT 8124' MD TO 6550' MD (MIDDLE OF CM3). BEGIN TO SEE SIGNS OF TIGHT HOLE AND SWABBING AT 6550' MD. 40-50 FPM PULLING SPEED NO HOLE ISSUES AND CORRECT HOLE FILL UP TO 6550' MD Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 15 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 23:00 14.00 DRILL N HMAN 6,700.00 INT1 SHORT TRIP FROM HOLE SECTION TD: BACKREAM OUT OF THE HOLE WITH 8-1/2" DRILLING ASSEMBLY FROM 6550' MD (MIDDLE OF CM3) TO 9-5/8" WINDOW AT 3670' MD - 375-525 GPM, ERRATIC PRESSURE 2100-3100 PSI WITH REGULAR SUDDEN PRESSURE SPIKES 120-150 RPM, 4-13 KFT-LBS TRQ (VERY ERRATIC WHILE BACKREAMING, CONSTANT WHILE WORKING ONE STAND ON REPEAT PASSES) 300 - 500 FPH PULLING SPEED MW IN/OUT = 10.7 PPG ECD HARDLINE = 11.7 PPG, CALC CLEANHOLE = 11.3 PPG, ACTUAL = 11.4-12.2 PPG (SUDDEN QUICK SPIKES WHILE BACKREAMING) - CLASSIFIED NPT FOR FAILURE TO INCLUDE THE GHOST REAMER AS PLANNED (POOR HOLE CONDITIONS ATTRIBUTED TO LACK OF GHOST REAMER) 5400' - 4900' MD (UGNU): OBSERVE REGULAR ECD SPIKES AND INCREASING LOSS RATE TO 10-20 BPH WHILE BACKREAMING. SUSPECT POTENTIAL FOR WELLBORE BREATHING. MAKE NOTIFICATIONS TO WSUP AND WOS AND DISCUSS PLANS TO PREPARE FOR INITIATING WELLBORE BREATHING RP PROTOCOL IF FLOWANOMALLY IS OBSERVED ON NEXT CONNECTIONS. FILL MGS OFFLINE. FLOWBACKAT 4850' MD CONNECTION SHOWS NO ANOMALLY AFTER CIRCULATING AT 415 GPM WITH -10 BPH LOSS RATE FOR 45 MIN PRIOR TO CONNECTION WHILE FILLING MGS. - FLOWBACKAT 4755' MD: OBSERVE -4 BBLS GREATER FLOWBACK OVER THAN TYPICAL FLOWBACK OVER -2 MIN WITH PUMPS OFF. *** SHUT IN WELL PER STANDING ORDERS WITH ANNULAR PREVENTER ***. Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 16 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time, 3/4/1982 12,00 OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL N DPRB 4,755.00 INTI PERFORM EXHALE TEST TO DIAGNOSE 9/15/2016 00:00 - 03:30 3.50 I � � DRILL N HMAN 6,700.00 03:30 - 04:00 0.50 DRILL P WELLBORE BREATHING PER BP ALASKA RP AS FOLLOWS: MONITOR PRESSURE BUILDUP. INITIAL SIDP = 0 PSI, SICP BUILDS TO 66 PSI IN 3 MIN, THEN BEGINS TO BLEED OFF TO 55 PSI AT 10 MIN OF MONITORING. ROLL PUMPS DOWN DRILLPIPE TO ESTABLISH -80 PSI SIDP. - OPEN SUPER CHOKE AND BLEED PRESSURE TO 0 PSI INSTANTLY. BLEED BACK NO MEASUREABLE VOLUME IN TRIP TANKAFTER 15 MIN, RECORD DECLINING FLOWRATE IN VIS CUP UNTIL WELL IS DEAD. STRIP PIPE DOWN THROUGH ANNULAR PREVENTER AFTER 25 MIN STATIC TO CONFIRM PIPE IS FREE. - OPEN ANNULAR PREVENTER WITH WOS APPROVAL. MONITOR WELL ON RIG FLOOR FOR 10 MIN (STATIC). - BLOWDOWN AND RE -ALIGN ALL WELL CONTROL EQUIPMENT. - PER BOPE USAGE RP: NON -WELL CONTROL EVENT, NO AOGCC NOTIFICATION REQUIRED, WILL TESTANNULAR PREVENTER AND HCR WHEN BACK ON THE SURFACE, WILL CREATE TRACTION REPORT i - FOR DRILLING TROUBLE TIME. INT1 SHORT TRIP FROM SECTION TD: BACKREAM OUT OF THE HOLE WITH 8-1/2" DRILLING ASSEMBLY FROM 4755' MD TO 9-5/8" WINDOW AT 3670' MD - 500 GPM, 1900-2050 PSI, 150 RPM, 2-4 KFT-LBS TRQ, 400-1000 FPH PULLING SPEED. IMPROVED HOLE CONDITIONS ONCE UP ABOVE 4700' MD (TRIP DEPTH WITH MOTOR DRILLING ASSEMBLY) MW IN/OUT = 10.7 PPG ECD HARDLINE = 11.7 PPG, CALC CLEANHOLE = 11.3 PPG, ACTUAL= 11.3-11.2 PPG - LOSSES REDUCE TO NEARLY 0 BPH WHILE BACKREAMING. NO SIGNS OF WELLBORE BREATHING WITH NO LOSSES. - DIFFICULTY PULLING ON ELEVATORS INTO WINDOW WITH FINAL FULL STAND FROM 3785' MD TO 3740' MD BIT DEPTH (70' -135 - BACK FROM BIT IN BHA). RESORT TO BACKREAMING UP THROUGH TOUGH SPOT WITH 500 GPM, 1830 PSI, 40 RPM, 2-12 KFT-LBS TRQ - CLASSIFIED NPT FOR FAILURE TO INCLUDE THE GHOST REAMER AS PLANNED (POOR HOLE CONDITIONS ATTRIBUTED TO LACK OF GHOST REAMER) INTI SHORT TRIP FROM SECTION TD: CIRCULATE HOLE CLEAN WITH 2 BOTTOMS UP FROM 9-5/8" WINDOWAT 3670' MD 500 GPM, 1860 PSI, NO PIPE MOVEMENT NO SIGNIFICANT CUTTINGS RETURNS Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 17 of 30 Common Well Name. 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 06:00 2.00 DRILL P INTI CHANGEOUT TOP DRIVE SAVER SUB DUE TO WEAR - INSTALL FOSV IN TOP OF DRILLSTRING AND MONITOR WELL WITH CONSTANT CIRCULATION OVER THE TOP (STATIC) 06:00 06:30 0.50 DRILL P INTI CIRCULATE ONE BOTTOMS UP TO CONFIRM HOLE CLEAN 500 GPM, 1800 PSI, NO PIPE MOVEMENT. REMOVE FOSV FROM STRING AFTER PUMPS DOWN 06:30 17:30 11.00 DRILL P INT1 SHORT TRIP FROM HOLE SECTION TD: TRIP IN THE HOLE WITH 8-1/2" DRILLING ASSEMBLY FROM 9-5/8" WINDOW TO HOLE SECTION TD AT 9197' MD TRIP ON ELEVATORS WITH NO ISSUES FROM WINDOW TO 7745' MD (FAULT IN CM1 AT 7760' MD) - WASH AND REAM THROUGH TIGHT HOLE AT 500 GPM, 3050-3500 PSI, 40-120 RPM, 6-9 KFT-LBS TRQ FROM 7745' MD TO 8375' MD (TOP OF KINGAK) PUMP BACK OUT OF THE HOLE FROM 8375' MD TO TOP OF SHALES AT 8086' MD, 1 BPM, 135 PSI, 30 FPM - CIRCULATE HI -VIS SWEEP SURFACE TO SURFACE (10% INCREASE IN RETURNS AT SHAKERS FOR SWEEP, LARGE SOFTBALL -SIZE COAL OBSERVED IN RETURNS DURING CIRCULATING) - TRIP IN HOLE ON ELEVATORS WITH NO ISSUES FROM 8086' MD TO 9125' MD ON ELEVATORS STAGE UP PUMPS IN 1 BPM INCREMENTS OVER 45 MIN AND WASH DOWN FINAL STAND TO 1' OFF BOTTOM (PURPOSELY DON'T TAG BOTTOM WITH ROTATING BIT); 500 GPM, 3150 PSI, 100 RPM, 9 KFT-LBS TRQ 17:30 20:30 3.00 DRILL P INT1 CIRCULATE HOLE CLEAN AT HOLE SECTION TD WITH 4 TOTAL BOTTOMS UP - 500 GPM, 3150 PSI ICP, 3050 PSI FCP, 100 RPM, 8 KFT-LBS TRQ, RECIPROCATING FULL STAND MW IN/OUT = 10.7 PPG ECD CLEANHOLE = 11.3 PPG, ACTUAL INITIAL = 11.4 PPG, ACTUAL FINAL = 11.3 PPG. - CIRCULATE ONE 40 BBL HI -VIS SWEEP SURFACE TO SURFACE (20% INCREASE IN CUTTINGS) - RETURNS AT SHAKERS SIGNIFICANTLY CLEANUP AT END OF TWO BOTTOMS UP AFTER SWEEP. RECORD SCRS AT END OF CIRCULATING FLOWCHECK WELL FOR 10 MIN AFTER PUMPS DOWN PRIOR TO PULLING OFF BOTTOM (STATIC) - FINAL PU/SO/ROT WEIGHTS = 225/150/173 KLBS - SERVICE AND LUBRICATE RIG DURING INTERVAL - NO SIGNS OF WELLBORE BREATHING AFTER SHUTTING PUMPS DOWN. Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 18 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:00 1.50 DRILL P INT1 FINAL TRIP FROM HOLE SECTION TD: PUMP 22:00 00:00 2.00 DRILL P 9/16/2016 0000 03:30 3.50 DRILL P 03:30 05:30 2.00 DRILL P 05:30 06:00 0.50 DRILL P 06:00 08:30 2.50 BOPSUR P OUT OF THE HOLE WITH 8-1/2" DRILLING ASSEMBLY FROM TD AT 9197' MD TO TOP OF I SHALES AT 8086' MD. 0.8 BPM, 40 FPM INITIAL PU WEIGHT OFF BOTTOM = 225 KLBS NO HOLE ISSUES INT1 FINAL TRIP FROM HOLE SECTION TD: PULL OUT OF THE HOLE WITH 8-1/2" DRILLING ASSEMBLY ON ELEVATORS FROM TOP OF 'SHALES AT 8086' MD TO 5342' MD AT MIDNIGHT. 50-60 FPM PULLING SPEED INITIAL 30 KLBS OVERPULLS FROM 7900'-7700' MD (FAULT AT 7760' MD). WIPE THROUGH AND HAVE NO ISSUES ON REPEAT PASSES. INT1 FINAL TRIP FROM HOLE SECTION TD: PULL OUT OF THE HOLE WITH 8-1/2" DRILLING ON ELEVATORS FROM 5342' MD TO BHAAT 899' MD. 60 FPM IN OPENHOLE, 110-265 FPM IN CASED HOLE NO HOLE ISSUES IN OPENHOLE PUMP DRY JOBAND DROP 2.40" DRILLPIPE DRIFTAT WINDOW - HOLD UNANNOUNCED KWT DRILL WITH FAILURE SCENARIO COMPLEXITIES AND AAR WITH HUNDLEY CREW. 02:30 RESPONSE TIME. - FLOWCHECK WELL FOR 10 MIN AT 9-5/8" WINDOW AND PRIOR TO PULLING BHA THROUGH BOP STACK (STATIC) INTI FINAL TRIP FROM HOLE SECTION TD: RACK BACK HWDP AND LAYDOWN 8-1/2" DRILLING ASSEMBLY FROM 899' MD TO SURFACE. GRADE BIT 2-2-1/8 UNDER GAUGE FUNTION TEST BLIND -SHEAR RAMS AS PART OF WEEKLY BOPE FUNCTION TEST. RECOVER DRILLPIPE DRIFT INT1 CLEAN AND CLEAR RIG FLOOR AFTER TRIPPING INTI PRESSURE TEST ANNULAR PREVENTER AND HCR VALVES WITH 4" TEST JOINT TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH TO BP STANDARDS AND AOGCC REQUIREMENTS - PULL WEAR RING, SET TEST PLUD, RE -SET WEAR RING AS PART OF TASK - TEST REQUIRED PER BOPE USAGE RP FOR BREATHING WELL SHUT-IN ON 9/14/16 (NO AOGCC NOTIFICATION/FORM REQUIRED) PASSING TEST, SEE ATTACHED CHART `All depths reported in Drillers Depths` North America - ALASKA - BP Page 19 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 12:30 4.00 CASING P INT1 RIG UP TO RUN 7" INTERMEDIATE DRILLING 12:30 - 19:30 7.00 CASING P 19:30 - 20:00 0.50 CASING P 20:00 - 00:00 4.00 CASING P LINER - VOLANT TOOL ONSITE TO RIGUP AT WINDOW FOR OPENHOLE SECTION FILL UP HOSE, DOUBLE STACK TONGS MAKEUP LINER HANGER, ADD M -GEL TO TBR AND RACK BACK IN DERRICK (FOR EFFICIENT XO IN OPENHOLE AT -5678' MD - TALLYAPPROVED BY ODE. CONFIRM PIPE COUNTAND LAYOUT IN PIPE BARN INT1 RUN 7" INTERMEDIATE DRILLING LINER FROM SURFACE TO 9-5/8" WINDOW AT 3670' MD - BAKERLOK SHOE TRACK AND CHECK FLOATS (PASS) - APPLY JET LUBE SEAL GUARD (FRICTION FACTOR = 1.0) AND TORQUE TURN CONNECTIONS WITH DOUBLE STACK TONGS TO OPT MU 11950 FT -LBS RUNNING SPEED = 75 FPM (TO LIMIT 'SURGE) - VAM REP ON LOCATION TO WITNESS RUN & VERIFY EACH THREAD MAKEUP (PIPE DOPE MANAGEMENT, CLEANING AND INSPECTING PIN END SEALAREA, CLEANING MUD FROM BOX AFTER FILLING PIPE WITH HOSE) LAY DOWN & REPLACE 3 JTS OF 7" LINER PER VAM REP, CORROSION DAMAGE TO NOSE SEAL ON PIN END (LIKELY OCCURRED PRE -DELIVERY TO RIG) RUN 8-1/4" STRAIGHT BLADE CENTRALIZERS ACROSS PLANNED CEMENTED INTERVAL (1500' UP FROM SHOE) FILL PIPE ON THE FLY IN CASED HOLE FUNCTION TEST UPPER PIPE RAMS ON 7" JOINT TO COMPLETE REQUIREMETNS FOR 9/13/16 WEEKLY BOPE FUNCTION TEST INT1 CIRCULATE 1.5 X BU (-141 BBLS) AT 9-5/8" WINDOW - STAGE UP PUMPS IN 1 BPM INCREMENTS TO 6 BPM, 655 PSI, -235 FPM AV INT1 RUN 7" INTERMEDIATE DRILLING LINER FROM 9-5/8" WINDOW AT 3670' MD TO 4892' MD AT MIDNIGHT - APPLY JET LUBE SEAL GUARD (FRICTION FACTOR = 1.0) AND TORQUE TURN CONNECTIONS WITH DOUBLE STACK TONGS TO OPT MU 11950 FT -LBS RUNNING SPEED = 40 FPM VAM REP ON LOCATION TO WITNESS RUN Printed 10/10/2016 9:38:25AM `All depths reported in Drillers Depths" North America - ALASKA - BP Page 20 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/17/2016 00:00 - 02:00 2.00 CASING P INT1 RUN 7" INTERMEDIATE DRILLING LINER 02:00 - 03:00 1.00 CASING P 03:00 - 03:30 0.50 CASING P 03:30 05:30 2.00 CASING P FROM 4892' MD AT MIDNIGHT TO 5638' MD (XO DEPTH) - APPLY JET LUBE SEAL GUARD (FRICTION FACTOR = 1.0) AND TORQUE TURN CONNECTIONS TO OPT MU 11950 FT -LBS RUNNING SPEED = 40 FPM MONITOR DISPLACEMENT WITH ACTIVE 1 PIT FILL PIPE EVERY JOINT -WASH DOWN EVERY 5 JOINTS AT 5 BPM, 1630 PSI TOTAL OF 50 BBLS PUSHED AWAY WHEN RUNNING 7" LINER INTI CROSS OVER TO DRILL PIPE AT 5638' MD RIG DOWN VOLANTTOOLAND BALE EXTENSIONS RIG UP 5" ELEVATORS PU AND INSTALL LINER HANGER PER WFT REP - PU 170 KLBS, SO 140 KLBS FOR FULL LINER LENGTH OF 5678' MD INT1 RIH WITH LINER ON DRILLPIPE FROM 5678' MD TO 6370' MD (TOP OF COLVILLE) - RUNNING SPEED SLOWED FROM 40 TO 30 FPM AFTER PUSHING AWAY 1/2 OF PIPE _ — DISPLACEMENT ON FIRST FEW STANDS INT1 BREAK CIRCULATION AT 6400' MD. WELL ON IMMEDIATE 65-120 BPH LOSSES. - WORK PIPE WHILE CIRCULATING BOTTOMS UP ACCOUNTING FOR LOSS RATE. LOSE TOTAL OF 130 BBLS. SHUT DOWN PUMPS AND MONITOR DECLINING FLOWBACK TREND. FLOWBACK 35 BBLS IN 25 MIN. DISCUSS PLAN FORWARD WITH WELLS OPS SPECIALIST. Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 21 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 10:30 5.00 CASING P INT1 RUN IN HOLE WITH 7" LINER IN DRILLPIPE 10:30 - 15:30 5.00 CASING P FROM 6370' MD TO 9192' MD FILL PIPE EVERY 5 STANDS RUNNING SPEED = 30 FPM CIRCULATE ONE BOTTOMS UP OVER 4 STANDS ABOVE THE HRZ FROM 7800' TO 8150' MD, 5 BPM, 625 PSI, -50 BPH LOSSES. MONITOR DECLINING FLOW TREND (BREATHING) WHEN PUMPS SHUT OFF NO BREAKING CIRCULATION THROUGH 'SHALES NO ISSUES RUNNING THROUGH OPENHOLE PLANNED SET DEPTH FOR LINER IS 9196' MD. UNABLE TO WORK PIPE PAST 9192' MD. CONFIRM PIPE TALLIES AND DISCUSS WITH ANCHORAGE TEAM. DECISION TO CALL PIPE ON BOTTOM AND CONITNUE WITH CEMENT PLAN. WILL CONFIRM DEPTHS UPON DRILLING OUT SHOE. - NOTE ON 9/19/16: 7" LINER CONFIRMEDAT 9192' MD, TSAG CONFIRMED AT 9192' MD. CORRECTALL DEPTH SON 7" LINER TALLY TO 'OFFICIAL 9192' MD SET DEPTH. TOL = 3514' MD - FINAL PU/SO WEIGHTS = 320/162 KLBS (P272 BLOCKS + TD = 35 KLBS) - SEE ATTACHED 7" LINER TALLY INTI STAGE UP PUMPS IN 1/2 BBL INCREMENTS TO 5 BPM CEMENTING RATE OVER 1 HOUR. CONTINUE TO CIRCULAE HOLE CLEAN & CONDITION MUD WITH TOTAL OF 5 BOTTOMS UP. 2 BPM, 400 PSI 3 BPM, 475 PSI 4 BPM, 570 PSI 5 BPM, 700 PSI ICP, 650 PSI FCP CONDITION MUD TO 10.7 PPG, 18 YP RECIPROCATE PIPE STRETCH AT 420 FPH LOSS RATE = 10 BPH WITH UNCERTAINTY ABOUT LOSS ZONE. DISCUSS WITH ANCHORAGE AND DECISION TO PUMP CEMNET DURING CEMENT JOB - SIMOPS: MIRU SLB CEMENTERS Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 22 of 30 Common Well Name. 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 17:30 2.00 CEMT P INT1 CEMENT 7" INTERMEDIATE LINER AS FOLLOWS: - FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH TO LEAKTIGHT CRITERIA (PASSING TESTS) - PUMP 30 BBLS OF 12 PPG MUDPUSH II SPACER @ 5 BPM, 650 PSI RELEASE BOTTOM DART PUMP 5 BBLS OF NEAT CEMENT PUMP 36 BBLS CEMENT WITH 1 PPB CEMNET PUMP 10 BBLS NEAT CEMENT TOTAL OF 51 BBLS (224 SACKS) CLASS G 15.8PPB CEMENT WITH GAS BLOCK, EXCESS VOLUME 40% (YIELD 1.17 CU.FT/SK); 5 BPM, 730 PSI ICP, 380 PSI FCP WITH SLOWDOWN TO 3 BPM FOR FIRST DART LATCH RELEASE TOP DART SLB KICK OUT DART WITH 10 BBLS 8.4 PPG FRESH WATER 1 PERFORM DISPLACEMENT WITH RIG PUMPS 'AND 10.7 PPG LSND MUD PER SLB CADE - 221 BBLS DISPLACED AT 5 BPM: ICP 475 PSI FCP 1115 PSI REDUCE RATE TO 2 BPM FOR FINAL 17 BBLS PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 736 PSI (720 PSI PREDICTED BY CEMCADE) BUMP PLUG AT 2535 STROKES FOR TOTAL DISPLACEMENT VOLUME OF 238.2 BBLS (CALCULATES TO 97% PUMP EFFICIENCY) NO LOSSES FROM TIME CEMENT ROUNDED THE SHOE - RECIPROCATE PIPE STRETCH THROUGHOUT CIRCULATING AND THROUGH CEMENT JOB UNTIL CEMENT ROUNDED CORNER FIELD PICK TOC = 7692' MD (1500' ABOVE SHOE AS PLANNED) - CIPAT 17:15 (500 PSI COMPRESSIVE WILL BE REACHED AT 01:20 ON 9/18/16) — --- 17:30 - 18:00 0.50 CASING P INTI HANGOFF 7" INT LINER AT DIRECTION OF WEATHERFORD REP AS FOLLOWS: - AFTER BUMPING PLUG AT 736 PSI, CONITNUE TO PRESSURE UP TO 2400 PSI TO SET HANGER. CONFIRM SET WITH 40 KLBS SLACKOFF - PRESSURE UP TO 3200 PSI TO RELEASE RUNNING TOOL. - BLEED OFF PRESSURE TO 0 PSI AND CHECK FLOATS (HOLDING) PULL UP HOLE TO EXPOSE DOG SUB. SET DOWN WITH 60 KLBS AND 20 RPM TO SET LINER TOP PACKER. - APPLY 1000 PSI AND PULL UP OUT OF LINER TOP. OBSERVE PRESSURE DROP WHEN OUT OF LINER. 18:00 - 18:30 0.50 CASING P INT1 CIRCULATE ONE BOTTOMS UP AT 7" LINER TOP AT 351 8'MD 10 BPM, 690 PSI, NO PIPE MOVEMENT Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 23 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 19:30 1.00 CASING P INT1 SLIP AND CUT 9 WRAPS, 72' OF 1-3/8" DRILL LINE 19:30 21:00 1.50 CASING P INT1 PULL OUT OF HOLE WITH 7" LINER RUNNING TOOLS FROM TOL AT 3514' MD TO BHAAT 700' MD. 265 FPM PULLING SPEED FLOWCHECK WELL FOR 10 MIN PRIOR TO _ PULLING BHA THROUGH STACK (STATIC) - - - - -- 21:00 - 21:30 0.50 CASING P INTI_71RACK BACK 5" HWDP AND LAYDOWN LINER RUNNING TOOLS.FROM 700' MD TO SURFACE. NO EXTERNAL ISSUES NOTED WITH TOOLS. CLEAN AND CLEAR RIG FLOOR AFTER TRIPPING. 21:30 23:00 1.50 BOPSUR P INT1 CHANGEOUT UPPER RAMS TO 2-7/8" X 5" VARIABLE BORE RAMS BARRIERS FOR RAM CAHNGEOUT: STATIC 10.7 PPG KWF AND CLOSED BLIND -SHEAR RAMS 23:00 00:00 1.00 BOPSUR P INT1 RIG UP TO TEST BOPE FILL STACK AND TEST JOINT. PERFORM SHELL TEST i - SIMOPS: LAYDOWN 5" HWDP OFFLINE 9/18/2016 00:00 01:30 1.50 BOPSUR P INTI COMPLETE RIGGING UP FOR BOPE TEST - - - - - - - - 01:30 06:30 5.00 BOPSUR P INT1 PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH TO BP STANDARDS AND AOGCC REGULATIONS. TEST WITNESSED BY AOGCC REP GUY COOK - TESTANNULAR AND VBRS WITH 2-7/8" AND 4-1/2" TEST JOINTS NO FAILURES, SEE ATTACHED DOCUMENTATION TEST CHART RECORDER WITHIN CALIBRATION RANGE (DUE 10-7-16) BOPE STACK CONFIGURATION, TOP TO BOTTOM: 13-5/8" 5K SHAFFER ANNULAR, 2-7/8" X 5" CAMERON VBRS, BLIND -SHEARS, MUD CROSS, 2-7/8" X 5" VBRS 06.30 07:30 1.00 BOPSUR P INT1 RIG DOWN AFTER BOPE TESTING. PULL TEST PLUG AND INSTALL 8-15/16" WEAR RING. 07:30 09:00 1.50 CASING P INTI PRESSURE TEST 7" LINER AND LAP TO 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN (PASSING TEST WITH 10.7 PPG LSND, SEE ATTACHED DOCMENTATION) 50 PSI LOST IN FIRST 15 MIN, 15 PSI LOST IN SECOND 15 MIN 6.1 BBLS PUMPED AND 6.1 BBLS BLED BACK RECEIVE APPROVAL TO PROCEED FROM FILL-IN WSUP - TEST CHART RECORDER WITHIN CALIBRATION RANGE (DUE 10-7-16) i09:00 10:00 1.00 CASING P INT1 RIG BLACKOUT DRILL WITH BP WELLS OPERATIONS SPECIALIST + AAR WITH WITH RIG TEAM Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 24 of 30 j Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 13:30 3.50 CASING P INT1 MAKEUP AND RUN IN HOLE WITH 6-1/8" RSS 13:30 18:00 4.50 CASING P 18:00 19:00 1.00 CASING P ____119:00 0000 5.00 CASING P 9/19/2016 t00:00 01:30 1.50 CASING P 01:30 - 02:30 1.00 CASING P DRILLING ASSEMBLY FROM SURFACE TO BHA CAL AT 191' MD - NEW BAKER HUGHES T406FSX 6-1/8" PDC BIT W/ 6X11 JETS - 4-3/4" DI R/RES/GR/DEN/N EU/CALI PER/POROSITY SHALLOW HOLE TEST ASSEMBLY AT 2000' MD (PASS) - NOV MOCS CIRC SUB AT TOP OF BHA, 188' BACK FROM BIT HYDRAULIC DRILLING JARS PLACED 3152' BACK FROM BIT PER SLB MODEL, 4 KLBS, BELOW JARS - BHA WEIGHT = -10 KLBS INT1 TRIP IN THE HOLE WITH 6-1/8" DRILLING ASSEMBLY ON ELEVATORS FROM BHAAT 191' MD TO 8976' MD. - NO ISSUES PASSING THROUGH 7" LINER TOP AT 3518' MD 250 FPM RUNNING SPEED INT1 WASH DOWN WITH 6-1/8" DRILLING ASSEMBLY FROM 8976' MD; 2 BPM 460 PSI. -TAG CEMENT STRINGERS AT 9033' MD (65' ABOVE LANDING COLLAR). INCREASE FLOWRATE TO 225 GPM, 1600 PSI & ADD ROTARY AT 40 RPM. TAG HARD CEMENT AT 1 9058' MD (AS EXPECTED FOR -2 BBLS CEMENT WASHED UP ON PLUGS) - WASH/REAM DOWN TO TAG PLUGS ON LANDING COLLAR AT 9098' MD; 150-200 FPH (ON DEPTH, LANDING COLLAR = 9098' MD) SLOW PUMP RATES: 8976' MD, 10.7 PPG MUD MP#1: 30 SPM - 680 PSI, 40 SPM - 900 PSI MP#2: 30 SPM - 640 PSI, 40 SPM - 890 PSI INT1 DRILL UP PLUGS/LANDING COLLAR AND HARD CEMENT IN SHOE TRACK FROM 9098' MD TO 9119' MD AT MIDNIGHT - 225 GPM, 1550 PSI, 40-75 RPM, 7-8 KFT-LBS TRQ ON BTM, 3-10 KLBS WOB THROUGH PLUGS - 4 HOURS TO DRILL UP PLUGS/LANDING COLLAR 225 GPM, 1550 PSI, 60 RPM, 8-9 KFT-LBS TRQ ON BTM, 5-10 KLBS WOB, 30 FPH THROUGH HARD SHOE TRACK CEMENT INT1 COMPLETE DRILLING OUT HARD CEMENT IN SHOE TRACK FROM 9119' MD TO 9185' MD (7' FROM 7" LINER SHOE) - 275 GPM, 2230 PSI, 60-80 RPM, 8-9 KFT-LBS TRQ ON BTM, 10 KLBS WOB - 30-40 FPH UNTIL WORKING PIPE 20' TWICE. BIT CLEARS UP AND ROP JUMPS TO 200 FPH THROUGH HARD CEMENT INT1 CIRCULATE ONE BOTTOMS UP PRIOR TO DISPLACEMENT - 300 GPM, 2600 PSI ICP, 2550 PSI FCP, 40 RPM, 6-7 KFT-LBS TRQ, RECIPROCATE 20' STROKESAT 1000 FPH Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 25 of 30 Common Well Name. 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00 OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From- To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) -- - - - -- - - 0230 04:00 1.50 INT1 CASING P INTI DISPLACE WELL FROM 10.7 PPG LSND TO NEW 8.6 PPG QUICKDRIL-N MUD MAX UNDERBALANCE DURING DISPLACEMENT TO 10.1 PPG ML KINGAK PP AT 8946' TVD = 663 PSI AT END OF PUMPING MONITOR BBL IN VS BBL OUT AND OBSERVE NO DISCREPANCIES OUTSIDE +/- 5 'BBLS FOLLOW PRESSURE SCHEDULE IN MUD PROGRAM AND OBSERVE NO DISCREPANCIES OUTSIDE 500 PSI ALLOWABLE DIFFERENTIAL - SEE ATTACHED PRESSURE CHART FOR DISPLACEMENT. ICP = 2550 PSI, FCP = 1600 PSI AT 300 GPM SLOW PUMP RATES: 9185' MD, 8.6 PPG MUD MP#1: 30 SPM - 515 PSI, 40 SPM - 510 PSI MP#2: 30 SPM - 660 PSI, 40 SPM - 660 PSI 04:00 04:30 0.50 CASING P INTI FLOWCHECK WELL FOR 30 MIN TO CONFIRM INTEGRITY OF 7" LINER LAP OBTAIN APPROVAL TO PROCEED FROM FILL-IN WSUP - FLOWCHECK MEETS BP PRACTICE 100204 'REQUIREMENT FOR 15 MIN FLOWCHECK AFTER DISPLACEMENT PRIOR TO DRILLING SHOE TRACK 04:30 08:00 3.50 CASING P INT1 DRILL OUT REMAINING SHOE TRACK, 1' RATHOLE, & 20' NEW FORMATION TO 9217' MD - 300 GPM, 1532 PSI, 60 RPM, 8-9 KFT-LBS TRQ ON BTM, 10 KLBS WOB TAG SHOE AT 9192' MD (-THIGH COMPARED TO ORIGINAL PIPE TALLY) PERFORM 15 MIN FLOWCHECKAT 9197 MD (PRIOR TO DRILLING NEW FORMATION PER BP PRACTICE 100204) 08:00 - 08:30 0.50 CASING P INT1 CIRCULATE BOTTOMS UP TO CONFIRM MUD PROPERTIES FOR FIT 300 GPM, 1580 PSI, NO PIPE MOVEMENT MW IN/OUT = 8.6 PPG 08:30 - 10:00 1.50 DRILL P INT1 PERFORM FIT TO 9.8 PPG EMW - TEST WITH UPPER PIPE RAMS, PUMP DOWN TOP DRIVE AND KILL LINE - 8701' TVD, 8.6 PPG MW, 550 PSI SURFACE PRESSURE (8701' TVD REFER TO ORIGINAL PIPE TALLY SHOE DEPTH OF 9196' MD) PUMP 1.9 BBLS, BLEED BACK 1.9 BBLS DISCUSS RESULTS WITH ODE AND RECEIVE AUTHORIZATION TO PROCEED, SEE ATTACHED DOCUMENTATION - 7" ANNULAR CEMENT VERIFICATION METHOD CONFIRMED BY ODE Printed 10/10/2016 9:38:25AM `All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 26 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 18:00 8.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM 9217 MD TO 9425' MD IN SHUBLIK, TSAD FORMATIONS (208' IN 8 HRS = 26 FPH WITH CONNECTIONS) - 25-50 FPH INSTANTANEOUS RATE THROUGH SHUBLIK, 75-150 FPH THROUGH UPPER ZONE 4 - 300 GPM, 1550 PSI, 120-150 RPM, 9-10/8-9 KFT-LBS TRQ ON/OFF BTM, 14 KLBS WOB MW IN/OUT = 8.6 PPG NO LOSSES WHILE DRILLING AHEAD SURVEY EVERY JOINT (-30') FOR PLANNED DOGLEGS > 5*/100' MD NO BACKREAMING AT CONNECTIONS TSAD CAME IN IN 12' LOW TO PROGNOSIS LOG TSAG AND 7" LINER SHOE AT 9192' MD - ALL TALLIES TO NEW DEPTH. 18:00 - 00:00 6.00 DRILL P PROD1 'CORRECT DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM 9425' MD TO 9691' MD IN TSAD FORMATIONS (266' IN 6 HRS = 44 FPH WITH CONNECTIONS) 75-150 FPH INSTANTANEOUS RATE 300 GPM, 1550-1640 PSI, 120-150 RPM, 9-10/8-9 KFT-LBS TRQ ON/OFF BTM, 10-14 KLBS WOB MW IN/OUT = 8.7 PPG NO LOSSES WHILE DRILLING AHEAD SURVEY EVERY JOINT (-30') FOR PLANNED DOGLEGS > 5°/100' MD NO BACKREAMING AT CONNECTIONS TOTAL DRILLING TIME FOR PAST 24 HOUR REPORTING PERIOD = 10.6 HRS (76%) SLOW CIRCULATION RATES, 9636' MD, 8.6 PPG MW: MP#1: 30 SPM - 515 PSI, 40 SPM - 670 PSI MP#2: 30 SPM - 500 PSI, 40 SPM - 660 PSI 9/20/2016 00.00 - 06:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM 9691' MD AT MIDNIGHT TO 9914' MD (223' IN 6 HOURS = 37 FPH WITH CONNECTIONS) 75-150 FPH INSTANTANEOUS RATE 300 GPM, 1600-1650 PSI, 120 RPM, 9-10/8-9 KFT-LBS TRQ ON/OFF BTM, 14 KLBS WOB MW IN/OUT = 8.6 PPG NO LOSSES WHILE DRILLING AHEAD SURVEY EVERY JOINT (-30') FOR PLANNED DOGLEGS > 5°/100' MD NO BACKREAMING AT CONNECTIONS PUMP 30 BBL HI -VIS SWEEP AT 9800' MD WITH MEDIUM INCREASE IN CUTTINGS. Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Page 27 of 30 1 Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 12:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/2" PRODUCTION HOLE FROM 9914' MD TO 10206' MD (292' IN 6 HRS = 49 FPH WITH CONNECTIONS) 75-150 FPH INSTANTANEOUS ROP 300 GPM, 1630-1700 PSI, 150 RPM, 9-10.5/8-9 KFT-LBS TRQ ON/OFF BTM, 14 KLBS WOB MW IN/OUT = 8.6 PPG MINOR 5-10 BPH LOSSES TO FORMATION WHILE DRILLING AHEAD NO BACKREAMING AT CONNECTIONS SURVEY EVERY JOINT (-30') BECAUSE DOGLEGS > 5°/100' MD SLOW CIRCULATING RATES, 10200' MD, 8.6 'PPG MW MP#1: 30 SPM - 507 PSI, 40 SPM - 675 PSI MP#2: 30 SPM - 510 PSI, 40 SPM - 670 PSI 12:00 - 18:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/2" PRODUCTION HOLE FROM 10206' MD TO 10489' MD (283' IN 6 HRS = 47 FPH WITH CONNECTIONS) - 75-150 FPH INSTANTANEOUS ROP - 300 GPM, 1700 PSI, 150 RPM, 9-10.5/8-9 KFT-LBS TRQ ON/OFF BTM, 14 KLBS WOB MW IN/OUT = 8.6 PPG MINOR 5-10 BPH LOSSES TO FORMATION WHILE DRILLING AHEAD NO BACKREAMING AT CONNECTIONS SURVEY EVERY JOINT (-30') BECAUSE DOGLEGS > 5°/100' MD PUMP 30 BBL HI -VIS SWEEP AT 10300' MD WITH MINIMAL INCREASE IN RETURNS - UNANNOUNCED RIG FIRE DRILLAT 18:00 CHANGEOUT WHILE DRILLING AHEAD DUE TO SENSOR OVERHEATING IN HOT ROOM WITH STEAM HEATERS. - GREAT RESPONSE BY RIG TEAM TO TROUBLESHOOTAND SWEEPALARM AREA - MUSTER COMPLETED FOR ALL NON-ESSENTIAL PERSONNEL AFTER ACTION REVIEW TO DISCUSS LEARN INGS WITH FULL TEAM Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 28 of 30 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1800 23:00 5.00 DRILL P PROW DIRECTIONAL DRILL 6-1/2" PRODUCTION HOLE FROM 10489' MD TO 10744' MD, 8831' TVD (2551N 6 HRS = 51 FPH WITH CONNECTIONS) 75-150 FPH INSTANTANEOUS ROP 300 GPM, 1700 PSI, 150 RPM, 9-10.5/8-9 KFT-LBS TRQ ON/OFF BTM, 14 KLBS WOB MW IN/OUT = 8.6 PPG MINOR 5-10 BPH LOSSES TO FORMATION WHILE DRILLING AHEAD NO BACKREAMING AT CONNECTIONS SURVEY EVERY JOINT (-30') BECAUSE DOGLEGS > 5°/100' MD - SERVICE AND LUBRICATE RIG AT CONNECTION - PICKUP/SLACKOFF/ROTATING WEIGHTS = 181/145/160 KLBS - TOTAL DRILLING TIME FOR PAST 24 HOUR REPORTING PERIOD = 10.9 HRS, 47% SLOW CIRCULATING RATES, 10675' MD, 8.6 PPG MW MP#1: 30 SPM - 510 PSI, 40 SPM - 670 PSI _ MP#2: 30 SPM - 510 PSI, 40 SPM - 680 PSI 2300 00,00 1.00 DRILL P PROW 'CIRCULATE WHILE EVALUATING GEOLOGY PLAN FORWARD 300 GPM, 1700 PSI, 80 RPM, 6-7 KFT-LBS TRQ, RECIPROCATING 60' STROKES DECISION TO CONTINUE DRILLING AHEAD, BASICALLY ON ORIGINAL PLAN 9/21/2016 00:00 08:00 8.00 DRILL P PROW DIRECTIONAL DRILL 6-1/8" PROD HOLE FROM 10744' MD AT MIDNIGHT TO WELL TOTAL DEPTH AT 11237' MD, 8905' TVD (493' IN 8 HOURS = 62 FPH WITH CONNECTIONS. 75-150 FPH INSTANTANEOUS RATE 300 GPM, 1700-1800 PSI, 150 RPM, 8-9/8 KFT-LBS TRQ ON/OFF BTM, 14 KLBS WOB MW IN/OUT = 8.6 PPG NO LOSSES WHILE DRILLING AHEAD SURVEY EVERY JOINT (-30') FOR PLANNED DOGLEGS > 5°/100' MD NO BACKREAMING AT CONNECTIONS PUMP 30 BBL HI -VIS SWEEP AT 10800' MD WITH 50% INCREASE IN RETURNS - TOTAL ON BOTTOM ACTUAL DRILLING HOURS DURING 8 HR INTERVAL= 5.4 HRS (68%) - FINAL PU/SO/ROT WEIGHTS = 185/150/161 KLBS RECEIVE PERF MEMO FROM NEW WELLS TEAM: 389' NET PERFABLE FOOTAGE ACHEIVED Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 29 of 30 Common Well Name: 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 10:30 2.50 DRILL P PROD1 PLANNED SHORT TRIP FROM TD: CIRCULATE HOLE CLEAN AT 11237' MD WELL TD WITH 2.5 TOTAL BOTTOMS UP - 300 GPM, 1775 PSI, 150 RPM, 7 KFT-LBS TRQ, RECIPROCATING FULL STAND PUMP HI -VIS SWEEP AROUND WITH 50% INCREASE IN RETURNS. - FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM = STATIC) MINOR 5-10 BPH DYNAMIC LOSSES SLOW CIRCULATING RATES, 11237' MD, 8.6 PPG MW MP#1: 30 SPM - 473 PSI, 40 SPM - 638 PSI MP#2: 30 SPM - 467 PSI, 40 SPM - 626 PSI 10:30 - 12:00 1.50 DRILL P PROD1 PLANNED SHORT TRIP FROM TD: PULL OUT OF THE HOLE WITH 6-1/8" DRILLING ASSEMBLY ON ELEVATORS FROM WELL TD AT 11 23TMD TO 7" LINER SHOE AT 9192' MD. ONLY ONE MINOR TIGHT SPOT WITH 40 KLBS OVERPULLAT 10175' MD (SHALE ON LOGS). ABLE TO WIPE CLEAN. PULLING SPEED =60-100 FPM (NO LIMITS PER WELL PROGRAM FOR SWAB) INITIAL PICKUP WEIGHT OFF BOTTOM = 185 KLBS 12:00 14:00 2.00 DRILL P PROD1 PLANNED SHORT TRIP FROM TD: CIRCULATE 'HOLE CLEAN AT 9192' MD 7" LINER SHOE WITH 2 TOTAL BOTTOMS UP 300 GPM, 1550 PSI, 150 RPM, 3 KFT-LBS TRQ, RECIPROCATING FULL STAND 14:00 - 15:00 1.00 DRILL P PROD1 PLANNED SHORT TRIP FROM TD: TRIP IN HOLE WITH 6-1/8" DRILLING ASSEMBLY FROM 7" LINER SHOE AT 9192' MD TO WELL TOTAL DEPTH AT 11237' MD. MINOR TIGHT HOLE AT 10175' MD (SAME SPOT AS TRIP OUT). ABLE TO WIPE CLEAN RUNNING SPEED = 60-75 FPM -NO FILL ON BOTTOM 15:00 - 17:00 2.00 DRILL P PROD1 FINAL TRIP FROM WELL TD: CIRCULATE 17:00 - 18:30 1.50 DRILL P HOLE CLEAN AT 11237' MD WITH 2 TOTAL BOTTOMS UP - 300 GPM, 1800 PSI ICP, 1650 PSI FCP, 80 RPM, 5-6 KFT-LBS TRQ, RECIPROCATING FULL STAND - PUMP HI -VIS SWEEPAROUND WITH <20% INCREASE IN RETURNS. - FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM = STATIC) MINOR 5-10 BPH DYNAMIC LOSSES PROD1 FINAL TRIP FROM WELL TD: PULL OUT OF THE HOLE WITH 6-1/8" DRILLING ASSEMBLY FROM 11237' MD WELL TD TO 7" LINER SHOE AT 9192' MD. NO HOLE ISSUES PULLING SPEED = 60 FPM INITIAL PICKUP WEIGHT OFF BOTTOM = 185 KLBS Printed 10/10/2016 9:38:25AM *All depths reported in Drillers Depths* Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths` North America - ALASKA - BP Page 30 of 30 Operation Summary Report Common Well Name 14-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 X3 -017TH -C: (5,639,281.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 20:00 1.50 DRILL P PROD1 FINAL TRIP FROM WELL TD: CIRCULATE ONE BOTTOMS UP AT 9192' MD 7" LINER SHOE. 325 GPM, 1700 PSI, NO PIPE MOVEMENT FLOWCHECK WELL FOR 10 MIN AT 7" SHOE (STATIC) - PUMP DRY JOB & DROP 2.40" DRILLPIPE DRIFT 20:00 23:00 3.00 DRILL P PROD1 'FINAL TRIP FROM WELL TD: PULL OUT OF THE HOLE WITH 6-1/8" DRILLING ASSEMBLY ON ELEVATORS FROM 9192' MD 7" LINER SHOE TO BHA AT 191' MD. PULLING SPEED = 265 FPM LAYDOWN JAR STAND AT 3152' MD 5-10 BPH STATIC LOSS RATE HOLD UNANNOUNCED KWT DRILLAT 6500' MD WITH ASSISTANT DRILLER ON BRAKE + AAR 23:00 - 00:00 1.00 DRILL P PROD1 LAYDOWN 6-1/8" DRILLING ASSEMBLY FROM 191' MD TO SURFACE FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING BHA THROUGH STACK (STATIC) -GRADE BIT 1 -1 -IN GAUGE (SEE ATTACHED PHOTOS) BHA BROKEN DOWN AS SIMOPS DURING RIG UP FOR LINER RUN ON 9/22/16 CON REPORT #1 SEE ATTACHED FINAL GEOSURVEY END RON EVENT AT 23:59 ON 9/21/16 TOTAL DAYS/10K (SPUD TO LAYDOWN FINAL DRILLING BHA) = 17.6 Printed 10/10/2016 9:38:25AM 'All depths reported in Drillers Depths` Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 1 of 10 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations — (hr) (usft) 9/22/2016 00:00 01:00 1.00 CASING P RUNPRD BEGIN EVENT AT 00:00 WITH PARKER RIG 272 ON 9/22/16 CLEAR AND CLEAN RIG FLOOR AFTER TRIPPING OUT OF HOLE WITH DRILLING ASSEMBLY 01:00 - 02:30 1.50 CASING P RUNPRD RIG UP TO RUN LINER WITH DOYON CASING SERVICES - CONFIRM TALLIES AND PIPE COUNT IN PIPE SHED - SIMOPS: BREAKDOWN DRILLING ASSEMBLY COMPONENTS 02:30 - 08:00 5.50 CASING P RUNPRD RUN 51 JTS 4-1/2", 12.6#, 13CR, VAMTOP PRODUCTION LINER FROM SURFACE TO 2169' MD '- BAKERLOK SHOE TRACK AND CHECK FLOATS (PASS) - APPLY JET LUBE SEAL GUARD (FRICTION FACTOR = 1.0) AND TORQUE TURN EACH VAMTOP THREAD TO 4440 FT -LBS OPT MU TORQUE -CLEAN PIN SEALAREAAND RE -DOPE ON RIG FLOOR PER VAMTOP RECOMMENDATIONS RUN 2 CENTRALIZERS PER JOINT FOR ENTIRE LINER LENGTH PER TALLY RUNNING SPEED IN CASED HOLE = 90-120 FPM FILL PIPE ON FLY, TOP OFF EVERY 10 JOINTS LOSS RATE WHILE RIH = 10 BPH 08:00 08:30 0.50 CASING P RUNPRD MAKEUP WEATHERFORD LINER HANGER AND XO TO DRILLPIPE RIG UP 4" ELEVATORS, CONFIRM NEW LIFTING EQUIPMENT - LET SLIPS RIDE WHEN FIRST PICKING UP ASSEMBLY WITH HANGER TO CONFIRM THREADS HOLDING - WEATHERFORD REP ADDS M -GEL HI -VIS PILL TO PBR RIG DOWN LINER RUNNING EQUIPMENT BHA OVERALL LENGTH WITH HANGER ASSEMBLY = 2204' 08:30 09:00 0.50 CASING P RUNPRD CIRCULATE 1.5X LINER VOLUME AT 5 BPM, 105 PSI - PICKUP/SLACKOFF WEIGHT OF FULL LINER = 62 KLBS (P272 BLOCKS+TD = 35 KLBS) DYNAMIC LOSS RATE = 10 BPH Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 2 of 10 Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 13:30 4.50 CASING P RUNPRD RUN IN HOLE WITH LINER ON 4" DRILLPIPE FROM LINER OALAT 2204' MD TO 9192' MD (7" SHOE) RUNNING SPEED IN CASED HOLE = 70-90 FPM FILL PIPE EVERY 10 STANDS WHILE LOWERING TO FLOOR -STATIC LOSS RATE WHILE RIH = 10 BPH NO ISSUES PASSING THROUGH 7" LINER TOP PICKUP/SLACKOFF WEIGHTAT 9192' MD (7" SHOE) = 160/1_40 KLBS 1330 14:30 1.00 CASING P RUNPRD CIRCULATE 1.5X LINER + DRILLPIPE VOLUME AT 9192' MD (7" SHOE) 6 BPM, 590 PSI, NO PIPE MOVEMENT DYNAMIC LOSS RATE = 10 BPH MW IN/OUT = 8.6 PPG 14:30 16:00 1.50 CASING P RUNPRD RUN IN HOLE WITH 4-1/2" LINER FROM 9192' MD (7" SHOE) TO PLANNED SET DEPTH AT 11235' MD (TOL = 9031' MD) - NO ISSUES ENCOUNTERED IN OPEN HOLE RUNNING SPEED IN OPEN HOLE = 70 FPM FILL PIPE EVERY 10 STANDS WHILE LOWERING TO FLOOR WASH FINAL STAND DOWN WITH 2 BPM, 360 PSI TAG BOTTOM AT 11237' MD (NO FILL), I PICKUP PIPE STRETCH + 2' TO SET DEPTH - FINAL PICKUP/SLACKOFF WEIGHTS = 171/140 KLBS (P272 BLOCKS+TD = 35 KLBS) - STATIC LOSS RATE WHILE RIH = 10 BPH 16:00 19:00 3.00 CASING P RUNPRD CIRCULATE AND CONDITION MUD PRIOR TO CEMENTING 4-1/2" PRODUCTION LINER WITH 3 TOTAL BOTTOMS UP. STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE OF 6 BPM: @ 2 BPM, 360 PSI, 3% RETURN FLOW @ 3 BPM, 460 PSI, 3% RETURN FLOW @ 4 BPM, 580 PSI, 5% RETURN FLOW @ 5 BPM, 745 PSI, 7% RETURN FLOW @ 6 BPM, 1020 PSI, 7% RETURN FLOW CONDITION 8.6 PPG MUD TO 4 PV, 15 YP INITIAL/FINAL PRESSURE AT CEMENTING RATE: 1020 PSI - RECIPROCATE PIPE 10 FTAT SURFACEAT 350 FT/HR - DYNAMIC LOSS RATE = 10-15 BPH - HOLD PJSM FOR CEMENTING WITH RIG CREWAND SCHLUMBERGER CEMENTING CREW 19:00 20:00 1.00 CEMT N SFAL 11,237.00 RUNPRD PRESSURE TEST CEMENT LINES' TROUBLESHOOTAND ISOLATE LEAK BATCH UP MUDPUSH Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 3 of 10 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 22:00 2.00 CEMT P RUNPRD CEMENT 4-1/2" PRODUCTION LINER AS FOLLOWS: - FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MINUTES EACH (LEAKTIGHT CRITERIA PASS) BATCH UP CEMENT, CEMENT WET AT 20:25 PUMP 30 BBLS OF 12.0 PPG MUDPUSH II SPACER AT 6 BPM, 700 PSI PUMP 55 BBLS (53 BBLS, 255 SACKS DOWNHOLE) OF 15.8 PPG CLASS G WITH GASBLOK CEMENT AT 6 BPM, EXCESS VOLUME 30% (YIELD 1.17 CU.FT/SK) CLOSE LOWER TIW AND DISPLACE CEMENT OUT OF LINES WITH PERF PILL - DROP DRILL PIPE WIPER DART, OBSERVE POSITIVE INDICATION OF DART RELEASE PERFORM DISPLACEMENT WITH SCHLUMBERGER: - 58 BBLS PERF PILL DISPLACED AT 6 BPM: ICP 50 PSI; FCP 60 PSI - 16 BBLS MUD DISPLACED AT 6 BPM: ICP 60 PSI; FCP 880 PSI I - 17 BBLS MUD DISPLACED AT 3 BPM (FOR LATCH): ICP 360 PSI; FCP 915 PSI - 22 BBLS MUD DISPLACED AT 6 BPM: ICP 1700 PSI; FCP 1920 PSI - 10.4 BBL MUD DISPLACED AT 2 BPM (FOR BUMP): ICP 1150 PSI, FCP 1175 DISPLACEMENT FLUID: 58 BBLS OF 8.6 PPG PERF PILL (100K LSRV) FOLLOWED BY 65.4 BBL OF 8.6 PPG QUICKDRIL-N - LATCH UP CONFIRMED AT 91.1 BBLS DISPLACED (MINOR -100 PSI SPIKE) . CORRECT FINAL BUMP VOLUME FOR LATCH. - REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 1175 PSI (SLB CADE ESTIMATED -1050 PSI) TOTAL DISPLACEMENT VOLUME 123.4 BBLS RECIPROCATE PIPE 10 FTAT SURFACE THROUGHOUT ENTIRE JOB UNTIL FINAL 10 BBLS BEFORE BUMP & WHEN CEMENT EXITED SHOE (LINER SET IN TENSION, 2' OFF BOTTOM) - BUMP PLUG AT 123.4 BBLS (AS CALCULATED) AND PRESSURE UP TO 500 PSI OVER FINAL PRESSURE CEMENT IN PLACE AT 22:00 TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 0 BBLS - TOTAL LOSSES THROUGHOUT CEMENT JOB: 5 BBLS - FIELD PICK TOC = TOP OF 4-1/2" LINER AT 9031' MD Printed 10/10/2016 9:39 07AM 'All depths reported in Drillers Depths" North America - ALASKA - BP Page 4 of 10 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 22:30 0.50 CASING P RUNPRD COMPLETE WEATHERFORD LINER HANGER WORK WITH NO ISSUES AS FOLLOWS: PRESSURE UP TO 2500 PSI TO SET LINER HANGER, SLACK OFF LINER WEIGHT+ 50K TO CONFIRM PRESSURE UP TO 3500 PSI TO RELEASE LINER RUNNING TOOL - BLED OFF PRESSURE (1.75 BBLS) AND CHECK FLOATS (FOR 10 MIN) - GOOD PICKUP TO FREE TRAVEL WEIGHT+ 8 FT SET DOWN 5 KLBS ON LINER TOP, ROTATE 15 RPM AND SLACKOFF ADDITIONAL 50 KLBS TO SET PACKER - OBSERVE PACKER SHEAR WITH 35 KBLS DOWN APPLY 1200 PSI DOWN DRILLPIPE PICK UP TO REMOVE PACKOFF, OBSERVE PRESSURE LOSS AND RAMP UP PUMPS TO 500 GPM TO CIRCULATE OUT EXCESS CEMENT 22:30 - 23:30 1.00 CEMT P RUNPRD CIRCULATE OUT EXCESS CEMENT FROM LINER TOP WITH ONE BOTTOMS UP 500 GPM, 2100 PSI ICP, 1500 PSI FCP, NO LOSSES ESTABLISH LOW TRAVEL MARK TO ALLOW i FOR 10' RECIPROCATION STROKES OBSERVE -15 BBLS CEMENT BACKAT SURFACE STRUNG OUT OVER 100 BBL RIG DOWN CEMENT HEAD AT END OF CIRCULATING. 23:30 00:00 0.50 CEMT P RUNPRD '', DISPLACE WELL ABOVE 4-1/2" TOLAT 9031' MD FROM 8.6 PPG MUD TO 8.5 PPG KCL 510 GPM, 1825-1850 PSI, RECIPROCATE FULL STAND FINAL DETAILS OF DISPLACEMENT ON FIRST 9/23 TIME SUMMARY ENTRY. 9/23/2016 00:00 02:00 2.00 CASING P RUNPRD COMPLETE DISPLACING WELLABOVE 4-1/2" LINER TOP AT 9031' MD FROM 8.6 PPG QUICKDRIL-N MUD TO 8.5 PPG KCL. - 510 GPM, 1825-1850 PSI, RECIPROCATE FULL STAND - HAVE TO CIRCULATE EXTRA BOTTOMS UP TO GET WELL INTO BALANCE. - FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OUT OF HOLE (STATIC) 02:00 - 05:00 3.00 CASING P RUNPRD PULL OUT OF HOLE WITH 4-1/2" LINER RUNNING TOOLS FROM 9031' MD TOP OF 4-1/2" PROD LINER TO SURFACE, RACKING BACK 4" DRILLPIPE PULLING SPEED = 265 FPM, -3400'/HOUR NO FLOWCHECKAT BHA BECAUSE <90' IN LENGTH - SIMOPS: LOAD PERF GUNS IN PIPE SHED, BUILD TALLIES, AND CONFIRM LAYOUT 05:00 05:30 0.50 CASING P RUNPRD LAYDOWN WEATHERFORD LINER RUNNING TOOLS 05:30 - 06:00 0.50 CASING P RUNPRD CLEAR AND CLEAN RIG FLOOR AFTER TRIPPING Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 5 of 10 Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) -- - - - ---- - - - - - - 06:00 07:30 1.50 PERFOB P OTHCMP RIG UP TO RUN PERFORATING GUNS AND 07:30 - 12:00 4.50 12:00 - 17:00 5.00 PAC SPACER DRILLPIPE - CONFIRM PROPER HANDLING EQUIPMENT AND HOLD PJSM WITH RIG TEAM PERFOB P OTHCMP MAKEUP AND RUN IN HOLE WITH 2-3/4" PERFORATING ASSEMBLY FROM SURFACE TO BHA OVERALL LENGTH AT 2169' MD FLOWCHECK WELL PRIOR TO RIH (STATIC) 82 23' GUNS PICKED UP IN DOUBLES (-45' LONG DOUBLE GUNS) - FIRING HEAD SHROUD, BAKER HYDRAULIC DISCONNECT 10 JOINTS OF 2-7/8" PAC DRILLPIPE PICKUP/SLACKOFF WEIGHTS AFTER PICKING UP GUNS = 50 KLBS PERFOB P OTHCMP TRIP IN HOLE WITH 2-3/4" PERFORATING ASSEMBLY FROM BHAAT 2169' MD TO PERFORATING DEPTH AT 11 231'MD. RUNNING SPEED = 90 FPM NO ISSUES ENTERING TOP OF 7" OR 4-1/2" LINERS. 17:00 - 18:00 1.00 PERFOB P OTHCMP PRESSURE TEST 4-1/2" PRODUCTION LINER AND LAP WITH PERF GUNS ON DEPTH TO 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN PASSING TEST AGAINST UPPER PIPE RAMS, SEE ATTACHED DOCUMENTATION 30 PSI LOSS IN FIRST 15 MIN, 15 PSI LOSS IN SECOND 15 MIN PRESSURE UP VOLUME = BLEED BACK VOLUME = 6.5 BBLS LINER FULL OF 8.6 PPG PERF PILL, WELL FULL OF 8.5 PPG KCLABOVE 9031' MD TOL 18:00 - 18:30 0.50 PERFOB P OTHCMP WAIT FOR PERF GUNS TO ACTIVATE AT 18:30 - MAXFIRE GUN LOCKOUT TIME SET FOR 8.5 HOURS WHEN RUN IN HOLE AT 10.00 Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 6 of 10 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 19:30 1.00 PERFOB P OTHCMP PERFORATE 4-1/2" PRODUCTION LINER - 1000 PSI COMPRESSIVE STRENGTH FOR 4-1/2" LINER CEMENT REACHED AT 13:15 HOLD PJSM WITH RIG TEAM CLOSE UPPER PIPE RAMS TO APPLY ANNULAR PRESSURE FIRE GUNS WITH PRESSURE PULSES BETWEEN 100 AND 1100 PSI OVER 36 MIN TIME INTERVAL SHOTS FIRED WITH 100 PSI SURFACE PRESSURE. 100 PSI + (8.5- 7.2) PPG DIFFERENTIALAT TOP PERF 9311' MD, 8791' TVD = 694 PSI OVERBALANCE TO 7.2 PPG IVISHAK RESERVOIR - OBSERVE POSITIVE INDICATIONS OF GUNS FIRING: SONIC CONFIRMATION, INITIAL 6 BBL LOSS, PIPE MOVEMENT & SURFACE PRESSURE LOSS 19:30 - 2030 1.00 PERFOB P 20:30 - 22:00 1.50 PERFOB P 22:00 - 00:00 2.00 PERFOB P 9/24/2016 00:00 02:30 2.50 PERFOB P Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths' IVISHAK ZONE 4B PERFORATION SUMMARY (389' NET, 2334 TOTAL SHOTS): I- RECEIVE FINAL PERF MEMO FROM NWD TEAM ON 9/21 REFERENCING REAL-TIME DRILLING LWD LOGS - MAXFIRE FIRING HEAD, 2-3/4" MILLENNIUM CHARGES - 15 GRAM, 6 SPF, 60° PHASING, RANDOM ORIENTATION - 9311'-9370' MD (59'), 10630'-10865' MD (235'), 10930'-10960' MD (309, 11065'-11130' MD (65') OTHCMP PULL OUT OF HOLE WITH 2-3/4" PERFORATING ASSEMBLY ON ELEVATORS FROM 11231' MD SHOT DEPTH TO 9031' MD TOP OF 4-1/2" LINER (280' ABOVE TOP PERF). PULLING SPEED = 100 FPM NO SIGNS OF SWABBING OR DAMAGED GUNS/LINER MAINTAIN HOLE FILL WITH 8.5 PPG KCL FLOWCHECK WELLAT 4-1/2" LINER TOP FOR 10 MIN (STATIC) OTHCMP PULL OUT OF THE HOLE WITH 2-3/4" PERFORATING ASSEMBLY ON ELEVATORS, RACKING BACK DP, FROM TOLAT 9031' MD TO 5450' MD. - PULLING SPEED = 150 FPM OTHCMP PULL OUT OF THE HOLE WITH 2-3/4" PERFORATING ASSEMBLY ON ELEVATORS, LAYING DOWN DRILLPIPE SINGLES FROM 6422' MD TO 5667' MD AT MIDNIGHT PULLING SPEED = 150-265 FPM LAYDOWN PIPE ON TOH TO LEAVE ON 75 STANDS IN DERRICK FOR OFFLINE LAYDOWN OTHCMP PULL OUT OF THE HOLE WITH 2-3/4" PERFORATING ASSEMBLY ON ELEVATORS, LAYING DOWN DRILLPIPE SINGLES FROM 5667' MD AT MIDNIGHT TO BHAAT 2169' MD PULLING SPEED = 150-265 FPM FLOWCHECK WELL FOR 10 MIN WITH PERF GUNS -300' BELOW ROTARY TABLE AND PRIOR TO PULLING BHA THROUGH BOP STACK (LEAVE HOLE FILL ON TO RECORD STATIC LOSS RATE = 1 BPH). Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Page 7 of 10 Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 03:00 0.50 PERFOB P OTHCMP RIG UP TO LAYDOWN PAC PIPE AND PERF AND 82 2-3/8" HES PERFORATING GUNS GUNS - HOLD PJSM WITH HES AND RIG TEAM FOR LAYING DOWN PERF GUNS. REVIEW CONTINGENCY PLANS FOR NON-SHEARABLES ACROSS THE BOPS - CONFIRM HANDLING AND WELL CONTROL 'EQUIPMENT 03:00 - 06:30 3.50 PERFOB P OTHCMP LAYDOWN 10 JOINTS 2-7/8" PAC DRILLPIPE 9/25/2016 00:00 - 02:30 2.50 RUNCOM P **REPLACE BAKERLOK'D FULL JOINT UNDER PROD PACKER AND BAKERLOK'D COLLAR ON PUP ABOVE XN NIPPLE DUE TO BAD MAKEUP TORQUE CHART (-2 HOUR PROCESS) RUNCMP RUN 4-1/2", 12.6#, 13CR, VAMTOP COMPLETION TUBING FROM 7607' MD AT MIDNIGHT TO TOP OF 4-1/2" LINER AT 9031' MD. - CLEAN, INSPECT AND RE -DOPE PIN SHOULDERS AT RIG FLOOR - APPLY JET LUBE SEAL GUARD (FRICTION FACTOR = 1.0), HAND START THREADS, TORQUE TURN AND MU VAMTOP PREMIUM CONNECTIONS TO 4440 FT -LBS OPT MU TORQUE AT LOWSPEED 5 PM WITH TONGS - 1 XN NIPPLE, 3 X NIPPLES, 7 GLMS, 1 HES PERMANENT 7" X 4-1/2" PROD PACKER RUNNING SPEED = 90 FPM STATIC LOSS RATE _ <1 BPH, MW IN/OUT = 8.5 PPG KCL Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* AND 82 2-3/8" HES PERFORATING GUNS FROM 2169' MD TO SURFACE. - LAYDOWN PERF GUNS IN 23' SINGLES TO RELIEVE TRAPPED PRESSURE AND DRAIN GUNS _ -ALL GUNS CONFIRMED TO HAVE FIRED 06:30 07:00 0.50 PERFOB P OTHCMP CLEAR RIG FLOOR AFTER TRIPPING 07:00 07:30 0.50 WHSUR P RUNCMP PULL WEAR BUSHING 07:30 09:00 1.50 RUNCOM P RUNCMP RIG UP TO RUN TUBING WITH DOYON CASING SERVICES 09:00 09:30 0.50 RUNCOM P RUNCMP SERVICE AND LUBRICATE RIG 09:30 0000 14.50 RUNCOM P RUNCMP RUN 4-1/2",12.6#, 13CR, VAMTOP COMPLETION TUBING FROM SURFACE TO 7607' MD AT MIDNIGHT FLOWCHECK WELL FOR 10 MIN PRIOR TO RUNNING IN HOLE (STATIC) BAKERLOK ALL CONNECTIONS BELOW PRODUCTION PACKER CLEAN, INSPECT AND RE -DOPE PIN SHOULDERS AT RIG FLOOR - APPLY JET LUBE SEAL GUARD (FRICTION FACTOR = 1.0), HAND START THREADS, TORQUE TURN AND MU VAMTOP PREMIUM CONNECTIONS TO 4440 FT -LBS OPT MU TORQUE AT LOWSPEED 5 PM WITH TONGS RUNNING SPEED = 90 FPM STATIC LOSS RATE _ <1 BPH, MW IN/OUT = 8.5 PPG KCL 9/25/2016 00:00 - 02:30 2.50 RUNCOM P **REPLACE BAKERLOK'D FULL JOINT UNDER PROD PACKER AND BAKERLOK'D COLLAR ON PUP ABOVE XN NIPPLE DUE TO BAD MAKEUP TORQUE CHART (-2 HOUR PROCESS) RUNCMP RUN 4-1/2", 12.6#, 13CR, VAMTOP COMPLETION TUBING FROM 7607' MD AT MIDNIGHT TO TOP OF 4-1/2" LINER AT 9031' MD. - CLEAN, INSPECT AND RE -DOPE PIN SHOULDERS AT RIG FLOOR - APPLY JET LUBE SEAL GUARD (FRICTION FACTOR = 1.0), HAND START THREADS, TORQUE TURN AND MU VAMTOP PREMIUM CONNECTIONS TO 4440 FT -LBS OPT MU TORQUE AT LOWSPEED 5 PM WITH TONGS - 1 XN NIPPLE, 3 X NIPPLES, 7 GLMS, 1 HES PERMANENT 7" X 4-1/2" PROD PACKER RUNNING SPEED = 90 FPM STATIC LOSS RATE _ <1 BPH, MW IN/OUT = 8.5 PPG KCL Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 8 of 10 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 05:00 2.50 RUNCOM P RUNCMP SPACEOUTAND LAND COMPLETION ASSEMBLY AS FOLLOWS: TAG BASE OF 4-1/2" LINER TOP PBR AT 29.5' IN ON JOINT 208 LAYDOWN JOINTS 208, 207, 206 PICKUP AND RUN 19.83' PUP JOINT + JOINT 206 + HANGER/PUP + LANDING JOINT - DRAIN BOP STACKAND RUN IN HOLE WITH COMPLETION ASSEMBLY TO LANDAT42' RKB AND WITH WLEG AT 9036' MD (5' IN FROM TOP, 6' OFF NO-GO BOTTOM OF PBR). - FINAL PICKUP/SLACKOFF WEIGHTS = 147/119 KLBS (P272 BLOCKS + TD = 35 KLBS) - CAMERON REP RUN IN LOCKDOWN SCREWS. TORQUE LDS TO 450 FT -LBS AND GLAND NUTS TO 500 FT -LBS. LAYDOWN LANDING JOINT 05:00 - 07:00 2.00 RUNCOM P RUNCMP CIRCULATE IN NEW COMPLETION FLUID REVERSE IN 103 BBLS 8.5 PPG 120°F CORROSION INHIBITED SEAWATER; 4 BPM, 570 PSI - CHASE WITH 186 BBLS 8.6 PPG 1201 SEAWATER TO PLACE INHIBITED FLUID BETWEEN PROD PACKER AT 8915AND UPPER GLM AT 3465' MD; 4 BPM OVER DISPLACE BY 5 BBLS, THEN LINE UP DOWN TUBING AND PUMP 5 BBLS TO WASH OFF RHC PLUG PROFILE IN XN NIPPLE AT 9020' MD AND CIRCULATE FLUIDS BACK IN PLACE. MAKEUP LANDING JOINT AND DROP BALL& ROD. LAYDOWN LANDING JOINT. SIMOPS: LAYDOWN 4" DRILLPIPE STANDS WITH OFFLINE EQUIPMENT 07:00 09:30 2.50 RUNCOM P RUNCMP SET PACKER, TEST TUBING AND IAAS FOLLOWS: PRESSURE UP DOWN TUBING AND PRESSURE TEST TUBING WITH 8.6 PPG SEAWATER TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN (PASSING TESTS, SEE ATTACHED DOCUMENTATION). SET PACKER WHILE PRESSURING UP TO HIGH TEST. - 35 PSI LOSS IN FIRST 15 MIN, 15 PSI IN SECOND 15 MIN - 2.2 BBLS PRESSURE UP AND BLEED BACK VOLUME BLEED OFF TUBING PRESSURE TO 2000 PSI PRESSURE TEST IA WITH 8.6 PPG SEAWATER TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN (PASSING TESTS). - 40 PSI LOSS IN FIRST 15 MIN, 15 PSI IN SECOND 15 MIN -4.6 BBLS PRESSURE UP AND BLEED BACK VOLUME - BLEED OFF IA TO 0 PSI, THEN TUBING TO 0 PSI TO CONFIRM BLEED BACK VOLUMES. RECEIVE APPROVAL TO PROCEED FROM ACTING WSUP KEN SCHNEIDER. PRESSURE BACK UP ON TUBING TO 2000 PSI, THEN UP ON IAT0 3500 PSI. Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 9 of 10 Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor: PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 10:00 0.50 RUNCOM P RUNCMP SHEAR DCR VALVE IN UPPER GLM AT 3465' MD - BLEED OFF TUBING PRESSURE FROM 2000 PSI TO 0 PSI QUICKLY. OBSERVE SHEAR - CONFIRM TWO-WAY CIRCUALTION: 2.5 BPM DOWN TBG = 190 PSI, 2.5 BPM DOWN IA = 260 PSI 10:00 - 13:30 3.50 RUNCOM P RUNCMP 'FREEZE PROTECT TUBING AND IA TO 2200' MD/TVD WITH 6.8 PPG 90°F DIESEL - REVERSE IN 152 BBLS DIESEL TO IAAT 2.5 BPM, 160 PSI ICP, 290 PSI FCP. - SHUT DOWN PUMP AND LINE UP IA TO TUBING. ALLOW DIESEL TO U -TUBE FOR 1.5 HOURS. - FLOWCHECK WELL FOR 10 MIN AFTER U -TUBE (STATIC) WITH DIESEL IN PLACE, WELLBORE 400 PSI OVERBALANCE TO 7.2 PPG PORE PRESSURE AT UPPERMOST PERFS AT 9311' MD, 8791' TVD 33 BBLS DIESEL IN TUBING, 119 BBLS IN IA SIMOPS: LAYDOWN 4" DRILLPIPE STANDS WITH OFFLINE EQUIPMENT 13:30 15:30 2.00 WHSUR P RUNCMP CAMERON REP ON LOCATION TO SET AND TEST CIW TYPE H 4" TWC WITH T -BAR - 1 HOUR MONITOR OF WELL SATISFIED BY 1.5 HOURS U -TUBING - PRESSURE TEST TWC FROM ABOVE WITH FRESH WATER TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH (PASSING TESTS, SEE ATTACHED CHART) - PRESSURE TEST TWC FROM BELOW WITH DIESEL TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH (PASSING TESTS, SEE ATTACHED CHART). 15:30 20:30 5.00 BOPSUR P RUNCMP DRAIN, NIPPLE DOWN AND SET BACK BOP STACK. NIPPLE DOWN HIGH PRESSURE RISERS. SIMOPS: LAYDOWN 4" DRILLPIPE STANDS WITH OFFLINE EQUIPMENT BARRIERS FOR BREAKING CONTAINMENT: TESTED TWC DIESEL/SEAWATER KILL WEIGHT FLUID COLUMN ON TOP OF BALL & ROD TESTED PRODUCTION PACKER Printed 10/10/2016 9:39:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 10 of 10 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 X3 -017TH -C: (2,346,215.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: PARKER 272 Spud Date/Time: 3/4/1982 12:00:OOAM Rig Release: 9/25/2016 Rig Contractor. PARKER DRILLING CO. UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 23:30 3.00 WHSUR P RUNCMP NIPPLE UP 13-5/8" X 4-1/16" 5K GRAY TUBING HEAD ADAPTER AND DOUBLE MASTER 4-1/16 5K DRYHOLE TREE - COMERON REP PRESSURE TEST TUBING HEAD ADAPTER WITH HYDRAULIC FLUID TO 250 PSI LOW FOR 5 MIN AND 4500 PSI HIGH FOR 15 MIN (PASSING TEST, SEE ATTACHED DOCUMENTATION) - 10 PSI TOTAL LOSS SHOWING 'STABILIZATION RECEIVE APPROVAL TO PROCEED FROM WSUP - RIG TESTS DRYHOLE TREE WITH DIESEL TO 4500 PSI HIGH FOR FIVE MIN EACH - VISUAL INSPECTION FOR NO LEAKS, NO CHART. - ADD ONE BOTTLE OF DIESEL 911 TO TREE TO PREVENT FREEZING ISSUES. 23:30 00:00 0.50 WHSUR P RUNCMP CLEAN CELLAR AND SECURE WELLHEAD/TREE. - DOUBLE VALVES LEFT ON ANNULUS OUTLETS (TO BE REMOVED POST RIG) - SECURE EACH ANNULUS WITH QUARTER TURN VALVE, PRESSURE GAUGE, NEEDLE VALVE -ALL TREE/WELLHEAD VALVES LEFT CLOSED TO GAUGES CLOSEOUT WELLWORK TRANSFER PERMIT WITH DS OPERATOR. LEAVE WELLHOUSE SIGN HANDOVER WELL TO WELLS GROUP FINAL TWO = 0/0/0 PSI RELEASE PARKER 272 RIG AT 23:59 ON 09/25/16. NEXT EVENT = H -25A RIG SIDETRACK PERFORMANCE SUMMARY: - ACTUAL TOTAL DAYS = 21.9, 2.7 DAYS AHEAD OF 24.6 DAY AFE, 1.7 DAYS BEHIND 20.2 DAY TARGET. TOTAL NPT = 40 HRS HRS (1.7 DAYS, 8%) - ACTUAL TOTAL SPEND = -$7,750,000, - $235K (3%) UNDER $7.985MM AFE, -$150k UNDER $7.9MM TARGET Printed 10/10/2016 9:39:07AM 'All depths reported in Drillers Depths' A�,..4tbp North America - ALASKA - BP Prudhoe Bay PB DS 14 14-28 14-28B 500292070802 Design: 14-28B Final Survey Report 23 September, 2016 BAKER HUGHES �0.. f%"Ir by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: 14-28B Design: 14-28B BP reA.s Final Survey Report BAKER HUGHES Local Coordinate Reference: Well 14-28 ND Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 14, TR -10-14 Site Position: 70° 14'26.346 N From: Map Position Uncertainty: 0.00 usft Well 14-28, 14-28 Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 14-28B Magnetics Model Name Wellhead Elevation: BGGM2016 Design 14-28B Audit Notes: Northing: 5,939,577.430 usft Latitude: 70° 14'26.346 N Easting: 674,150.480 usft Longitude: 148° 35'36.726 W Slot Radius: 0.000 in Grid Convergence: 1.32 ° Northing: 5,938,008.700 usft Latitude: 70° 14' 10.572 N Easting: 675,677.820 usft Longitude: 148° 34'53.399 W Wellhead Elevation: 42.34 usft Ground Level: 41.48 usft Sample Date Declination Dip Angle Field Strength (°) (°) (nn 9/9/2016 18.29 80.99 57,556 Version: Phase: ACTUAL Tie On Depth: 3,617.48 Vertical Section: Depth From (TVD) +N/ -S +EI -W Direction (usft) (usft) (usft) (I 46.14 0.00 0.00 95.00 9/23/2016 10,43 36AM Page 2 COMPASS 5000.1 Build 81B bp"Po Azi (azimuth) TVD TVDSS Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: 14-28B Design: 14-28B Survey Program Date 9/23/2016 From To (usft) (usft) Survey (Wellbore) 117.48 3,617.48 14-22 Srvy 2 GYD-GC-CMS (14-28) 3,670.00 9,164.21 BHI OTK MWD 8-1/2" (14-28B) 9,222.53 11,203.03 BHI ATK MWD 6 1/8" (14-28B) Survey MD (usft) 46.14 117.48 217.48 317.48 417.48 517.48 617.48 717.48 817.48 917.48 1,017.48 1,117.48 1,217.48 1,317.48 1,417.48 1,517.48 1,617.48 1,717.48 1,817.48 1,917.48 BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Tool Name Description GYD-CT-CMS Gyrodata cont.casing m/s MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal FSFA9 BAKER HUGHES Well 14-28 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) True Minimum Curvature EDM R5K- Alaska PROD -ANCP1 Inc Azi (azimuth) TVD TVDSS N/S E1W Northing Easting DLeg V. Sec 1°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 0.00 0.00 46.14 -42.34 0.00 0.00 5,938,008.700 675,677.820 0.00 0.00 0.23 157.16 117.48 29.00 -0.13 0.06 5,938,008.569 675,677.879 0.32 0.07 0.27 184.00 217.48 129.00 -0.55 0.12 5,938,008.151 675,677.950 0.12 0.16 0.34 228.07 317.48 229.00 -0.99 -0.12 5,938,007.712 675,677.723 0.24 -0.03 0.14 257.50 417.48 329.00 -1.21 -0.46 5,938,007.480 675,677.388 0.23 -0.35 0.02 37.34 517.48 429.00 -1.22 -0.57 5,938,007.465 675,677.280 0.16 -0.46 0.16 102.81 617.48 529.00 -1.24 -0.42 5,938,007.451 675,677.427 0.15 -0.31 0.22 104.07 717.48 629.00 -1.32 -0.10 5,938,007.381 675,677.751 0.06 0.02 0.37 93.48 817.47 728.99 -1.38 0.41 5,938,007.326 675,678.261 0.16 0.53 0.17 120.14 917.47 828.99 -1.48 0.86 5,938,007.243 675,678.714 0.23 0.98 0.41 127.83 1,017.47 928.99 -1.77 1.27 5,938,006.959 675,679.131 0.24 1.42 0.18 135.58 1,117.47 1,028.99 -2.10 1.66 5,938,006.636 675,679.531 0.23 1.84 0.40 235.63 1,217.47 1,128.99 -2.41 1.48 5,938,006.323 675,679.360 0.47 1.69 0.72 220.64 1,317.46 1,228.98 -3.09 0.79 5,938,005.633 675,678.679 0.35 1.05 0.76 216.15 1,417.46 1,328.98 -4.10 -0.01 5,938,004.603 675,677.902 0.07 0.34 0.66 209.68 1,517.45 1,428.97 -5.13 -0.69 5,938,003.551 675,677.250 0.13 -0.24 0.39 201.53 1,617.44 1,528.96 -5.95 -1.10 5,938,002.725 675,676.859 0.28 -0.58 0.30 198.62 1,717.44 1,628.96 -6.52 -1.31 5,938,002.156 675,676.664 0.09 -0.74 0.25 164.24 1,817.44 1,728.96 -6.97 -1.33 5,938,001.697 675,676.650 0.17 -0.72 0.38 147.42 1,917.44 1,828.96 -7.46 -1.09 5,938,001.213 675,676.900 0.16 -0.44 9/23/2016 10:43:36AM Page 3 COMPASS 5000.1 Build 81B �00 BP F/. k2 b p Final Survey Report NUGNES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD (usft) 2,017.48 2,117.48 2,217.48 2,317.48 2,417.48 2,510.48 13 318" 2,517.48 2,617.48 2,717.48 2,817.48 2,917.48 3,017.48 3,117.48 3,217.48 3,317.48 3,417.48 3,517.48 3,617.48 TIP 3,670.00 KOP 3,697.81 Interpolated Azimuth 3,698.93 95181, 3,791.16 3,824.79 nc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 0.52 133.24 2,017.44 1,928.96 -8.05 -0.59 5,938,000.635 675,677.422 0.18 0.12 0.56 120.77 2,117.43 2,028.95 -8.61 0.16 5,938,000.092 675,678.186 0.12 0.92 0.29 132.38 2,217.43 2,128.95 -9.04 0.77 5,937,999.686 675,678.802 0.28 1.56 0.46 159.53 2,317.43 2,228.95 -9.58 1.10 5,937,999.147 675,679.142 0.24 1.93 0.37 103.94 2,417.43 2,328.95 -10.04 1.55 5,937,998.704 675,679.606 0.40 2.42 0.11 72.74 2,510.42 2,421.94 -10.08 1.93 5,937,998.668 675,679.987 0.30 2.80 0.10 64.45 2,517.42 2,428.94 -10.08 1.94 5,937,998.673 675,679.999 0.30 2.82 0.35 121.80 2,617.42 2,528.94 -10.20 2.28 5,937,998.557 675,680.340 0.31 3.16 0.15 65.19 2,717.42 2,628.94 -10.31 2.66 5,937,998.460 675,680.721 0.30 3.55 0.44 109.54 2,817.42 2,728.94 -10.38 3.14 5,937,998.398 675,681.203 0.35 4.04 0.28 140.32 2,917.42 2,828.94 -10.70 3.66 5,937,998.094 675,681.728 0.25 4.58 0.20 161.31 3,017.42 2,928.94 -11.05 3.87 5,937,997.745 675,681.948 0.12 4.82 0.33 136.86 3,117.42 3,028.94 -11.42 4.13 5,937,997.376 675,682.210 0.17 5.11 0.53 127.61 3,217.41 3,128.93 -11.92 4.69 5,937,996,897 675,682.784 0.21 5.71 0.60 139.05 3,317.41 3,228.93 -12.59 5.40 5,937,996.236 675,683.509 0.13 6.48 0.48 153.72 3,417.41 3,328.93 -13.37 5.93 5,937,995.477 675,684.056 0.18 7.07 3.05 98.75 3,517.35 3,428.87 -14.15 8.74 5,937,994.763 675,686.889 2.80 9.94 6.06 99.33 3,617.03 3,528.55 -15.41 16.58 5,937,993.685 675,694.755 3.01 17.86 7.77 104.54 3,669.16 3,580.68 -16.75 22.75 5,937,992.488 675,700.957 3.46 24.13 9.27 93.29 3,696.67 3,608.19 -17.35 26.81 5,937,991.982 675,705.026 8.04 28.22 9.33 92.91 3,697.77 3,609.29 -17.36 26.99 5,937,991.977 675,705.207 7.54 28.40 15.02 73.31 3,787.93 3,699.45 -14.30 45.93 5,937,995.473 675,724.066 7.54 47.00 14.32 64.10 3,820.47 3,731.99 -11.23 53.84 5,937,998.725 675,731.908 7.23 54.62 9/23/2016 10:43:36AM Page 4 COMPASS 5000.1 Build 81B '00 b BP rias sem: p Final Survey Report BAKER CsNES Company: North America - ALASKA- BP Local Coordinate Reference: Well 14-28 Project: Prudhoe Bay ND Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 II Survey- MD Inc Azi (azimuth) ND TVDSS N/S EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft (usft) 3,857.11 13.70 53.10 3,851.83 3,763.35 -7.19 60.50 5,938,002.923 675,738.469 8.45 60.90 3,885.42 13.32 43.34 3,879.36 3,790.88 -2.80 65.42 5,938,007.422 675,743.285 8.16 65.42 3,920.04 12.08 31.35 3,913.14 3,824.66 3.19 70.04 5,938,013.523 675,747.767 8.39 69.50 3,951.48 10.34 18.46 3,943.98 3,855.50 8.68 72.65 5,938,019.069 675,750.243 9.67 71.62 3,981.30 8.38 19.30 3,973.40 3,884.92 13.27 74.22 5,938,023.694 675,751.702 6.59 72.78 4,075.04 9.51 28.58 4,066.01 3,977.53 26.52 80.18 5,938,037.076 675,757.354 1.95 77.56 4,169.88 12.38 14.95 4,159.13 4,070.65 43.23 86.55 5,938,053.928 675,763.336 4.06 82.45 4,264.45 12.94 6.93 4,251.40 4,162.92 63.53 90.44 5,938,074.319 675,766.754 1.95 84.56 4,359.42 13.90 356.04 4,343.80 4,255.32 85.47 90.94 5,938,096.263 675,766.738 2.84 83.14 4,452.76 15.80 346.59 4,434.03 4,345.55 109.02 87.22 5,938,119.720 675,762.469 3.29 77.38 4,548.61 18.67 342.20 4,525.57 4,437.09 136.33 79.50 5,938,146.838 675,754.117 3.29 67.32 4,643.49 21.85 337.67 4,614.57 4,526.09 167.13 68.15 5,938,177.365 675,742.049 3.73 53.32 4,738.40 23.64 337.48 4,702.10 4,613.62 201.05 54.15 5,938,210.945 675,727.264 1.89 36.42 4,833.17 24.99 337.54 4,788.46 4,699.98 237.10 39.22 5,938,246.639 675,711.503 1.42 18.41 4,928.31 25.03 334.69 4,874.68 4,786.20 273.87 22.94 5,938,283.015 675,694.369 1.27 -1.02 5,022.71 24.93 331.27 4,960.25 4,871.77 309.37 4.84 5,938,318.082 675,675.447 1.53 -22.15 5,116.64 25.00 330.21 5,045.41 4,956.93 343.96 -14.54 5,938,352.204 675,655.271 0.48 -44.46 5,211.21 24.85 330.18 5,131.17 5,042.69 378.54 -34.35 5,938,386.314 675,634.662 0.16 -67.21 5,306.36 24.99 329.91 5,217.46 5,128.98 413.28 -54.37 5,938,420.571 675,613.841 0.19 -90.18 5,399.79 26.10 328.98 5,301.76 5,213.28 447.97 -74.86 5,938,454.772 675,592.553 1.26 -113.61 5,495.09 26.42 329.24 5,387.22 5,298.74 484.15 -96.50 5,938,490.440 675,570.071 0.36 -138.33 5,590.25 26.38 330.01 5,472.46 5,383.98 520.65 -117.90 5,938,526.432 675,547.833 0.36 -162.83 5,683.94 26.46 331.60 5,556.36 5,467.88 557.04 -138.23 5,938,562.335 675,526.660 0.76 -186.25 5,778.42 26.40 332.17 5,640.97 5,552.49 594.13 -158.05 5,938,598.951 675,505.985 0.28 -209.23 5,873.16 26.40 333.36 5,725.83 5,637.35 631.59 -177.32 5,938,635.943 675,485.842 0.56 -231.70 5,968.15 26.62 334.16 5,810.83 5,722.35 669.62 -196.07 5,938,673.523 675,466.218 0.44 -253.68 6,062.86 26.59 334.13 5,895.51 5,807.03 707.76 -214.57 5,938,711.248 675,446.838 0.03 -275.44 9/23/2016 10:43:36AM Page 5 COMPASS 5000.1 Build 81B �� BP - •■ ,Nr,+' Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay ND Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Site: PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) Well: 14-28 North Reference: True Wellbore: 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Survey - - MD Inc Azi (azimuth) ND TVDSS NIS EM Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 6,157.26 26.65 334.74 5,979.91 5,891.43 745.94 -232.82 5,938,748.966 675,427.703 0.30 -296.95 6,251.54 26.56 334.68 6,064.20 5,975.72 784.12 -250.86 5,938,786.709 675,408.782 0.10 -318.24 6,346.81 26.58 335.28 6,149.41 6,060.93 822.73 -268.88 5,938,824.890 675,389.866 0.28 -339.56 6,441.57 26.64 335.95 6,234.14 6,145.66 861.39 -286.40 5,938,863.126 675,371.448 0.32 -360.39 6,535.21 26.58 335.84 6,317.86 6,229.38 899.67 -303.53 5,938,901.000 675,353.432 0.08 -380.79 6,630.03 25.22 337.24 6,403.15 6,314.67 937.66 -320.03 5,938,938.588 675,336.054 1.57 -400.53 6,725.28 22.16 339.16 6,490.37 6,401.89 973.17 -334.27 5,938,973.755 675,320.987 3.31 -417.82 6,818.59 18.72 340.39 6,577.79 6,489.31 1,003.73 -345.56 5,939,004.043 675,308.989 3.72 -431.73 6,913.79 15.46 340.76 6,668.77 6,580.29 1,030.11 -354.87 5,939,030.195 675,299.067 3.43 -443.30 7,007.43 11.88 348.06 6,759.75 6,671.27 1,051.33 -360.98 5,939,051.267 675,292.465 4.24 -451.24 7,102.96 8.16 358.29 6,853.82 6,765.34 1,067.73 -363.22 5,939,067.613 675,289.846 4.30 -454.90 7,197.22 6.26 17.57 6,947.34 6,858.86 1,079.32 -361.87 5,939,079.230 675,290.928 3.24 -454.56 7,292.01 6.22 44.97 7,041.59 6,953.11 1,087.88 -356.68 5,939,087.909 675,295.917 3.11 -450.14 7,386.21 6.90 80.25 7,135.21 7,046.73 1,092.46 -347.49 5,939,092.692 675,304.994 4.27 -441.38 7,480.69 8.29 109.88 7,228.89 7,140.41 1,091.10 -335.49 5,939,091.617 675,317.026 4.34 -429.31 7,575.47 11.25 123.11 7,322.30 7,233.82 1,083.72 -321.31 5,939,084.573 675,331.367 3.90 -414.54 7,669.43 15.29 129.46 7,413.74 7,325.26 1,070.84 -304.06 5,939,072.093 675,348.912 4.56 -396.24 7,763.87 18.87 133.15 7,504.00 7,415.52 1,052.47 -283.30 5,939,054.218 675,370.096 3.96 -373.95 7,858.86 21.53 130.78 7,593.14 7,504.66 1,030.58 -258.89 5,939,032.900 675,395.008 2.93 -347.73 7,894.37 23.77 130.88 7,625.91 7,537.43 1,021.64 -248.54 5,939,024.203 675,405.559 6.31 -336.64 7,926.36 25.85 129.50 7,654.95 7,566.47 1,012.98 -238.29 5,939,015.788 675,416.014 6.75 -325.67 7,953.30 26.54 128.85 7,679.12 7,590.64 1,005.47 -229.07 5,939,008.494 675,425.405 2.77 -315.83 8,049.30 29.15 132.02 7,764.00 7,675.52 976.36 -194.99 5,938,980.187 675,460.153 3.12 -279.34 8,143.35 32.72 133.40 7,844.66 7,756.18 943.55 -159.49 5,938,948.216 675,496.403 3.87 -241.12 8,237.39 35.72 133.60 7,922.41 7,833.93 907.15 -121.13 5,938,912.720 675,535.593 3.19 -199.74 8,331.43 35.79 133.76 7,998.73 7,910.25 869.20 -81.39 5,938,875.708 675,576.203 0.12 -156.84 8,425.94 35.82 133.40 8,075.38 7,986.90 831.08 -41.34 5,938,838.539 675,617.131 0.23 -113.62 9/23/2016 10:43:36AM Page 6 COMPASS 5000.1 Build 81B "00w by Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: 14-28B Design: 14-28B Survey MD Inc (usft) t°) 8,519.57 35.88 8,614.63 35.09 8,709.15 35.10 8,804.13 35.11 8,898.28 35.08 8,993.08 35.01 9,088.18 35.07 9,164.21 35.10 9,196.00 36.42 INTERMEDIATE CASING 1 9,222.53 37.53 9,256.60 41.71 9,290.63 43.57 9,318.36 45.53 9,350.77 46.49 9,382.93 49.97 9,412.05 52.97 9,448.71 57.39 9,477.18 60.87 9,507.24 64.36 9,540.95 68.58 9,571.97 72.36 9,601.85 75.90 9,635.22 79.80 9,665.88 83.61 9,696.72 87.18 9,728.92 89.96 BP rel.I Final Survey Report BAKER HUGHES Local Coordinate Reference: Well 14-28 TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 132.60 8,151.27 8,062.79 793.68 -1.24 5,938,602.089 675,658.093 0.50 -70.41 131.87 8,228.67 8,140.19 756.59 39.61 5,938,765.960 675,699.796 0.94 -26.48 131.73 8,306.01 8,217.53 720.37 80.13 5,938,730.694 675,741.137 0.09 17.04 131.39 8,383.71 8,295.23 684.13 121.00 5,938,695.423 675,782.838 0.21 60.91 131.00 8,460.75 8,372.27 648.48 161.73 5,938,660.733 675,824.386 0.24 104.59 132.10 8,538.36 8,449.88 612.38 202.47 5,938,625.590 675,865.951 0.67 148.32 133.17 8,616.22 8,527.74 575.40 242.63 5,938,589.556 675,906.967 0.65 191.56 133.54 8,678.44 8,589.96 545.40 274.41 5,938,560.305 675,939.431 0.28 225.83 134.51 8,704.24 8,615.76 532.48 287.76 5,938,547.708 675,953.083 4.52 240.26 135.27 8,725.43 8,636.95 521.22 299.07 5,938,536.713 675,964.646 4.52 252.50 136.83 8,751.67 8,663.19 505.57 314.13 5,938,521.423 675,980.070 12.61 268.87 137.55 8,776.70 8,688.22 488.66 329.80 5,938,504.882 675,996.121 5.65 285.95 137.47 8,796.46 8,707.98 474.32 342.94 5,938,490.849 676,009.590 7.07 300.29 137.84 8,818.97 8,730.49 457.08 358.64 5,938,473.986 676,025.693 3.07 317.44 139.13 8,840.39 8,751.91 439.12 374.53 5,938,456.401 676,041.995 11.23 334.83 139.35 8,856.53 8,770.05 421.87 389.40 5,938,439.500 676,057.263 10.32 351.15 140.56 8,879.46 8,790.98 398.83 406.75 5,938,416.920 676,077.145 12.36 372.44 140.28 8,894.06 8,805.58 380.00 424.32 5,938,398.458 676,093.146 12.25 389.59 141.34 8,907.89 8,819.41 359.31 441.18 5,938,378.172 676,110.483 12.02 408.19 142.63 8,921.34 8,832.86 334.97 460.21 5,938,354.276 676,130.069 13.00 429.26 143.80 8,931.71 8,843.23 311.56 477.71 5,938,331.280 676,148.109 12.69 448.74 144.92 8,939.86 8,851.40 288.20 494.45 5,936,308.323 676,165.389 12.38 467.45 146.26 8,946.90 8,858.42 261.29 512.88 5,938,281.851 676,184.439 12.33 488.15 146.74 8,951.33 8,862.85 236.00 529.62 5,938,256.955 676,201.764 12.52 507.04 147.78 8,953.80 8,865.32 210.14 546.24 5,938,231.498 676,218.983 12.05 525.85 148.37 8,954.61 8,866.13 182.82 563.26 5,938,204.585 676,236.634 8.83 545.19 9/23/2016 10:43:36AM Page 7 COMPASS 5000.1 Build 81B by Company: Project: Site: Well: Wellbore: Design: Survey MD (usft) 9,760.6 9,791.0 9,823.6 9,855.03 9,884.84 9,917.10 9,948.93 9,979.17 10, 011.9 10,043.0 10,073.5 10,105.9 10,137.4 10,168.2 10, 201.6 10,233.2 10,263.1 10,295.7 10, 329.2 10, 356.9 10, 390.3 10,422.2 10, 451.7 10,485.3 10, 518.0 10,546.2 10, 580.8 BP rias Final Survey Report BAKER HUGHES North America - ALASKA - BP 7 2 5 9 3 2 8 8 8 0 B 1 9 3 4 6 8 3 7 0 Local Co-ordinate Reference: Well 14-28 Prudhoe Bay TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) PB DS 14 MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) 14-28 North Reference: True 14-28B Survey Calculation Method: Minimum Curvature 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 9 92.24 145.30 8,954.00 8,865.52 156.24 580.64 5,938,178.414 676,254.621 12.03 564.81 5 93.64 141.40 8,952.44 8,863.96 131.92 598.73 5,938,154.523 676,273.276 13.63 584.95 5 95.33 138.03 8,949.89 8,861.41 107.13 619.74 5,938,130.232 676,294.856 11.54 608.04 3 96.45 135.58 8,946.67 8,858.19 84.38 641.10 5,938,107.983 676,316.742 8.55 631.31 4 97.69 134.18 8,943.00 8,854.52 63.50 662.06 5,938,087.604 676,338.182 6.25 654.01 0 98.74 131.76 8,938.39 8,849.91 41.74 685.42 5,938,066.394 676,362.041 8.11 679.18 3 100.26 129.13 8,933.13 8,844.65 21.38 709.31 5,938,046.593 676,386.395 9.45 704.75 101.17 126.41 8,927.51 8,839.03 3.18 732.80 5,938,028.949 676,410.295 9.34 729.73 102.34 123.42 8,920.84 8,832.36 -15.17 759.08 5,938,011.217 676,437.001 9.63 757.52 103.00 120.85 8,914.01 8,825.53 -31.33 784.80 5,937,995.667 676,463.084 8.33 784.54 103.10 117.92 8,907.11 8,818.63 -45.92 810.72 5,937,981.679 676,489.336 9.35 811.64 103.37 115.59 8,899.71 8,811.23 -60.09 838.83 5,937,968.167 676,517.765 7.06 840.87 104.16 113.08 8,892.21 8,803.73 -72.70 866.69 5,937,956.217 676,545.914 8.14 869.73 104.58 111.10 8,884.55 8,796.07 -83.94 894.39 5,937,945.624 676,573.865 6.36 898.30 104.65 109.13 8,876.12 8,787.64 -95.05 924.74 5,937,935.221 676,604.460 5.71 929.50 104.62 108.17 8,868.14 8,779.66 -104.83 953.71 5,937,926.122 676,633.647 2.94 959.21 104.52 108.28 8,860.64 8,772.16 -113.86 981.12 5,937,917.737 676,661.261 0.49 987.31 101.84 109.72 8,853.19 8,764.71 -124.22 1,011.20 5,937,908.081 676,691.574 9.25 1,018.18 101.10 110.18 8,846.54 8,758.06 -135.40 1,042.00 5,937,897.624 676,722.620 2.59 1,049.83 100.44 107.60 8,841.35 8,752.87 -144.23 1,067.81 5,937,889.394 676,748.635 9.43 1,076.32 98.82 104.66 8,835.77 8,747.29 -153.36 1,099.39 5,937,881.004 676,780.410 9.96 1,108.57 97.70 101.01 8,831.18 8,742.70 -160.37 1,130.17 5,937,874.712 676,811.347 11.85 1,139.85 97.00 99.28 8,827.41 8,738.93 -165.53 1,158.99 5,937,870.228 676,840.276 6.28 1,169.01 96.40 99.49 8,823.48 8,735.00 -170.97 1,191.93 5,937,865.553 676,873.335 1.89 1,202.30 93.44 97.78 8,820.68 8,732.20 -175.85 1,224.09 5,937,861.421 676,905.594 10.46 1,234.76 90.21 96.09 8,819.78 8,731.30 -179.26 1,252.10 5,937,858.668 676,933.679 12.91 1,262.96 87.97 94.31 8,820.33 8,731.85 -182.39 1,286.48 5,937,856.341 676,968.120 8.29 1,297.48 9/23/2016 10:43:36AM Page 8 COMPASS 5000.1 Build 81B 0.040 by 10.w Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: 14-28B Design: 14-28B Survey MD (usft) 10,612.34 10,640.51 10, 674.79 10,706.45 10,735.41 10,770.58 10,799.60 10, 830.32 10, 862.69 10, 894.48 10,924.74 10,958.38 10,989.64 11, 019.35 11,114.55 11, 203.00 4 1/2" 11,203.03 11,237.00 ' Projection to TD Casing Points BP Fels Final Survey Report BAKER HUGHES Local Co-ordinate Reference: Well 14-28 TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (in) (in) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 86.41 91.73 8,821.88 8,733.40 -184.05 1,317.94 5,937,855.414 676,999.603 9.55 1,328.96 86.13 89.72 8,823.71 8,735.23 -184.41 1,346.04 5,937,855.714 677,027.708 7.19 1,356.99 85.91 87.72 8,826.09 8,737.61 -183.64 1,380.23 5,937,857.274 677,061.866 5.86 1,390.99 85.82 88.20 8,828.37 8,739.89 -182.52 1,411.79 5,937,859.132 677,093.386 1.54 1,422.32 86.24 89.53 8,830.38 8,741.90 -181.95 1,440.67 5,937,860.377 677,122.248 4.81 1,451.05 87.83 90.25 8,832.20 8,743.72 -181.88 1,475.79 5,937,861.263 677,157.356 4.96 1,486.03 87.85 89.25 8,833.29 8,744.81 -181.75 1,504.79 5,937,862.065 677,186.342 3.44 1,514.91 87.88 87.95 8,834.44 8,745.96 -181.00 1,535.48 5,937,863.530 677,217.003 4.23 1,545.41 86.40 87.38 8,836.05 8,747.57 -179.69 1,567.78 5,937,865.599 677,249.263 4.90 1,577.48 84.56 87.44 8,838.56 8,750.08 -178.25 1,599.44 5,937,867.768 677,280.876 5.79 1,608.89 82.77 87.01 8,841.90 8,753.42 -176.80 1,629.48 5,937,869.923 677,310.871 6.08 1,638.69 79.78 87.37 8,847.00 8,758.52 -175.17 1,662.69 5,937,872.326 677,344.029 8.95 1,671.63 78.03 86.99 8,853.01 8,764.53 -173.66 1,693.32 5,937,874.548 677,374.621 5.72 1,702.02 78.00 87.01 8,859.18 8,770.70 -172.14 1,722.35 5,937,876.745 677,403.598 0.12 1,730.80 77.90 86.39 8,879.06 8,790.58 -166.78 1,815.29 5,937,884.268 677,496.389 0.65 1,822.92 78.03 86.19 8,897.50 8,809.02 -161.18 1,901.62 5,937,891.874 677,582.554 0.27 1,908.43 78.03 86.19 8,897.51 8,809.03 -161.18 1,901.65 5,937,891.877 677,582.584 0.27 1,908.46 78.03 86.19 8,904.55 8,816.07 -158.97 1,934.81 5,937,894.857 677,615.679 0.00 1,941.30 Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 3,698.93 3,697.77 9 5/8" 9.625 12.250 11,203.00 41/2" 4.500 6.125 9,196.00 INTERMEDIATE CASING 1 7.000 8.500 9/23/2016 10:43:36AM Page 9 COMPASS 5000.1 Build 81B b BP Feho p Final Survey Report BAKER HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: 14-28B Design: 14-28B Design Annotations Measured Vertical Depth Depth (usft) (usft) 3,617.48 3,617.03 3,670.00 3,669.16 3,697.81 3,696.67 11,237.00 8,904.55 Local Coordinate Reference: Well 14-28 TVD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) MD Reference: 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Local Coordinates +N/ -S +E/ -W (usft) (usft) Comment -15.41 16.58 TIP -16.75 22.75 KOP -17.35 26.81 Interpolated Azimuth -158.97 1,934.81 Projection to TO Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes 9/23/2016 10:43.36AM Page 10 COMPASS 5000.1 Build 81B nnnun:mr Bram WELLBORE DETAILS: 14288 REfERENCE6+foRM4TI0N Project: Prudhoe Bay Maa�urmm:le � Site: PBDS14 Coordno(o(WE) Reference: Well 14-28 True Nash /_.. Well: 14-26 5 M ]SbAm 14298 Ve ,A(TVDjReference: 1428AcWN@88.4Busfl(Pxkc272ACTl1ALj BAKER b � Wellbore1 14.28oroA%m�.eo.01section(vsjReverence: slot-(o.00N.aaaej(01 oem:ararzal Parent Wellbore: 14-28A Design: 14-2813 (1429114296) MVIt BCfV.Ynt Measuretl OepNRererence: 7428 AcW4@BB 40usfl (Peke 272ACTUALj MUGNES Tieon MD: 361 .48 cal mean Meade: k+�mumcurvxue Pest m m V A A m J 0 0 5939300 ___. �... 1 5939200 -�-- ---- 5939100 5939000'- - - -- 5938900 ---- 5938800 - 593137001 ---- 59386001 - --- - I 59385001- - C it 5938400{ - — �^ j 5938300 -_� O O „5938200-� bD I 5938100 - 0 5938000 --- --- — z 5937900 5937800 5937700 14-36;14 5937600 - - ------ 5937500 -- -- 5937400-. - - ---- 5937300 --- - Easting (100 usft/in) m m rn m m Co Co m 0 m m m rn m m mC,m m rn m m m m m m m m rn m m rn m J J V J V J V J J J V J V J V J J J J m m m m m m rn m m rn m m m rn rn m m O N W A N rn J rp O N W A m 0 J m r0 O N A fT rn V m tp O N 0 0 0 0 0 0 0 0 o O o 0 0 0 0 o o O O o 0 0 0 0 0 0 0 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5939300 28(414 I -- - 5938900 I -- -- -- 5938800 --- - 15938700 -. -- - 15938600 --4-III --� 5938500 ' , z 15938400 S r - ---- - - 1 5938300 IQ -*- — -- 5938200 O --L- -- - ---L-15938100 C -K -5938000v - - 5937900 15937800 -{--Y5937600 'I -.. &- 114 ?CA - {5937500 i ' 4-2;/14-i27 -2 14 27 j� Ti i* " ' 11 r,�- �-�-I - 5937200 143011j10 5599337723000 14-0 1114 84 �8itaF8 m mmm 0 m m m m m m m m m m m m m rn m m m m m- m 0 co m mm rn rn m V J V J J V N J V N J V V J V J J V V J V V J V V V V V J V J J V J J J V A A P A N m N N N m m rn m m rn m m rn m m J J J V V J m m m m J m tp O N W A m rn m tp O N A m m V m r0 + N A A J m O � N O O O O O O O O O 00 o O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Easting (100 usft/in) AOGC�C OFREET'R"EPORT b p North America - ALASKA - BP Prudhoe Bay PB DS 14 14-28 14-28B 14-28B AOGCC Post Drilling Offset Report 23 September, 2016 Few UK 2 BAKER HUGHES A©GCC OFFSET REPORT .I.0 4-, BP F/&/ pAnticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-28 Well Error: 0.00usft Reference Wellbore 14-28B Reference Design: 14-28B Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-28 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 14-28B Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 3,617.48 to 11,237.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,565.16usft Error Surface: Elliptical Conic Survey Program Date 9/23/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 117.48 3,617.48 14-22 Srvy 2 GYD-GC-CMS (14-28) GYD-CT-CMS Gyrodata cont.casing m/s 3,670.00 9,164.21 BHI OTK MWD 8-1/2" (14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 9,222.53 11,203.03 BHI ATK MWD 6 1/8" (14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 14 14-05 - 14-05 - 14-05 6,311.96 6,100.00 172.04 54.72 117.66 Pass - Major Risk 14-05 - 14-05A- 14-05A 6,311.96 6,100.00 172.04 54.72 117.66 Pass - Major Risk 14-07 - 14-07 - 14-07 4,686.84 4,600.00 465.36 382.99 97.98 Pass - Major Risk 14-08 - 14-08 - 14-08 3,930.81 4,025.00 110.38 55.09 55.30 Pass - Major Risk 14-08 - 14-08A - 14-08A 3,932.88 4,025.00 110.47 55.23 55.25 Pass - Major Risk 14-08 - 14-08AL1 - 14-08AL1 3,932.88 4,025.00 110.47 55.23 55.25 Pass - Major Risk 14-08 - 14-08AL1 P131 - 14-08AL1 PB1 3,932.88 4,025.00 110.47 55.12 55.36 Pass - Major Risk 14-08 - 14-08APB1 - 14-08APB1 3,932.88 4,025.00 110.47 55.12 55.36 Pass - Major Risk 14-08 - 14-08APB2 - 14-08APB2 3,932.88 4,025.00 110.47 55.12 55.36 Pass - Major Risk 14-09 - 14-09 - 14-09 3,634.57 3,925.00 831.65 132.24 746.80 Pass - Major Risk 14-09A- 14-09A- 14-09A 3,628.24 3,800.00 340.61 55.56 292.63 Pass - Major Risk 14-09A- 14-09APB1 - 14-09APB1 3,628.24 3,800.00 340.61 55.56 292.63 Pass- Major Risk 14-09A- 14-09ARD - 14-09ARD 3,628.24 3,800.00 340.61 55.56 292.63 Pass - Major Risk 14-09A - 14-096 - 14-09B 3,629.88 3,800.00 342.02 55.58 294.03 Pass - Major Risk 14-10 - 14-10 - 14-10 4,311.88 4,400.00 137.85 57.07 81.00 Pass - Major Risk 14-26 - 14-26 - 14-26 4,465.47 4,500.00 406.46 57.40 349.28 Pass - Major Risk 14-26 - 14-26A - WP02 4,467.69 4,475.00 477.88 161.86 316.27 Pass - Major Risk 14-27 - 14-27 - 14-27 3,640.63 3,675.00 453.63 50.02 406.31 Pass - Major Risk 14-28 - 14-28 - 14-28 Out of range 14-28 - 14-28A - 14-28A 3,935.51 3,925.00 43.12 6.17 37.46 Pass - Major Risk 14-29 - 14-29 - 14-29 10,342.07 9,050.00 54.89 209.42 -152.84 FAIL - Major Risk 14-30 - 14-30 - 14-30 3,629.96 3,675.00 330.85 52.48 280.80 Pass - Major Risk 14-30 - 14-30A - 14-30A 3,629.16 3,675.00 330.52 52.47 280.47 Pass - Major Risk 14-36 - 14-36 - 14-36 3,635.08 3,650.00 362.12 49.70 312.56 Pass - Major Risk 9/23/201610.47.56AM r! U(0�Ir-F �� OT r% �pORT COMPASS 5000.1 Build 81B ....., b �P U/FAR 2 p Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: O.00usft Reference Well: 14-28 Well Error: O.00usft Reference Wellbore 14-28B Reference Design: 14-28B Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 14-28 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) 14-28 Actual @ 88.48usft (Parker 272 ACTUAL) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 14-28 Actual @ 88.48usft (Parker Coordinates are relative to: 14-28 offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 ventral Meridian is 150° 0'0.000 W' Grid Convergence at Surface is: 1.330 1 0 0 v 0 m CL a) U) m U 0 (u U Ladder Plot 0 2000 4000 6000 8000 10000 12000 Measured Depth (2000 usft/in) LEGEND -�- 14-05,14-05,14-05 V1 a -. 14-09,14-09,14-09 V3 -�E- 14 -05,14 -05A,14 -05A V1 $ 14 -09A,14 -09A,14 -09A V1 -X- 14-07,14-07,14-07V1 $ 14-09A, 14-09APB1, 14-09APB1 VO -t- 14-08,14-08,14-08 V2 14-09A, 14-09ARD, 14-09ARD V1 14 -08,14 -08A,14 -08A V1 14-09A,14-09 B,14 -09B V1 -- 14-08,14-08AL1,14-08AL1 V2 14-10,14-10,14-10V1 -�- 14-08,14-08AL1 PB1,14-08ALl PB1 V1 14-26,14-26,14-26V10 $ 14-08,14-08APB1,14-08APB1 V1 14-26,14-26A, WP02 VO $ 14-28,14-28,14-28 V1 - 14 -28,14 -28A,14 -28A VO $ 14-29,14-29,14-29V1 $ 14-30,14-30,14-30 V9 - 14 -30,14 -30A,14 -30A V5 $ 14-36,14-36,14-36 V1 $ 14-286 9/23/2016 10:47:56AMAli ll,t 1t „10 O R�7 co—�� Ir�� pO Ir�� COMPgSS 5000.1 Build 81B Printed 10/20/2016 3:52:37PM North America - ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: 14-28 / 02 Report no.: 1 Report date: 9/17/2016 Project: Prudhoe Bay Site: PB DS 14 Spud Date/Time: 3/4/1982 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 AFE No.: Contractor: PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 9/25/2016 X3 -017TH -C: (5,639,281.00) UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) General Information Job type: Primary Cement job start date/time: 9/17/2016 3:30PM Job end date/time: 9/17/2016 5:30PM Cement Company: SCHLUMBERGER Cementer: CHARLES HACKER Cemented String: INTERMEDIATE CASING 1 String Size: 7.000 (in) String Set TMD: 9,192.00 (usft) Hole Size: 8.500 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start -End): RPM: Rotating Torque (init/avg/max): (ft-Ibf) Reciprocating Time (Start -End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: Fluid Name: SPACER Fluids (1 of 2) Slurry Type: SPACER Purpose: SPACER Class: Description: MUD PUSH II Density: 12.00 (ppg) Yield: Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 30.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 10.70 (ppg) PV: 13.00 (cp) YP: 19.000 (Ibf/100ft2) Viscosity: 48.00 (s/qt) Gels 10 Sec: 6.000 (Ibf/100ft2) Gels 10 Min: 8.000 (Ibf/100ft2) Fluid Name: CEMENT Fluids (2 of 2) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield: 1.1700 (ft'/sk) Mix Water Ratio: 5.208 (gal/sk94) Excess: 40.00 (%) Mix Method: BATCH Sacks Used: 244.50 (941b sacks) Water Volume: 30.3 (bbl) Excess Slurry Volume: 13.3 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 51.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 10.70 (ppg) PV: 13.00 (cp) YP: 19.000 (Ibf/100ft2) Viscosity: 48.00 (s/qt) Gels 10 Sec: 6.000 (Ibf/100ft2) Gels 10 Min: 8.000 (Ibf/100W) Additives Name Type Amount Units Concentration Unit D047 ANTIFOAM AGENT 0.200 GAL/SX D065 DISPERSANT 0.500 % BWOC D600 G GAS -BLOCK 2.000 GAL/SX D167 FLUID LOSS 0.100 % BWOC D177 RETARDER 0.030 GAL/SX Printed 10/20/2016 3:52:37PM Printed 10/20/2016 3:52:37PM North America - ALASKA - BP Page 2 of 2 Cementing Report ---- Common Well Name: 14-28- - _/02___ -- — - _ -- _n -- - Report o.: 1 Report date: 9/17/2011 6 Project: Prudhoe Bay Site: PB DS 14 Spud Date/Time: 3/4/1982 Event Type: RE -ENTER -ONSHORE (RON) Start Date: 9/4/2016 End Date: 9/21/2016 AFE No.: Contractor: PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 9/25/2016 X3 -017TH -C: (5,639,281.00) UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) Fluid Tests Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) (min) (psi) (°F) (min) 4.78 90.00 0.00 8.00 22.0 137.00 1,000.00 Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Float Pressure Returns Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Held Held Prior Surface Mud Lost Flow (gpm) (psi) (psi) (min) (hr) (bbl) (bbl) After 1 PRIMARY CEMENT 7,696.00 9,192.00 Y Y y y Pumping Schedule Fluid pumped Volume Avg, Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbl/min) (usft) (usft) (scf) (bbl/min) Tests Casing Test Shoe Test Liner Top Test Test Pressure: 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: (hr) How Determined: Printed 10/20/2016 3:52:37PM Printed 10/20/2016 3:53:14PM North Amerilos - ALASKA - $P Pagel of 3 Cementing Report Common Well Name: 14-28 / 02 _- ----_ --" — Project: Prudhoe Bay — --- ---- —- Site: PB DS 14 -- Report no.: 2 P Report date: 9/22/2016 - — - Event Type: COM- ONSHORE (CON) - - Spud Date/Time: 3/4/1982 - Contractor: PARKER DRILLING CO. Start Date: 9/22/2016 End Date: 9/25/2016 - — — — ------ AFE No.: — — UWI: 500292070800 Rig Name/No.: PARKER 272 Rig Release: 9/25/2016 X3 -017TH -C: (2,346,215.00) Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) _— - eeneeai ir1�6NmailOn Job type: Primary Company: SCHLUMBERGER Cement job start date/time: 9/22/2016 8:00PM Job end date/time: 9/22/2016 10:0013MCement Cemented String: PRODUCTION CASING 1 String Size: Cementer: CHARLES HACKER 4.500 (in) String Set TMD: 11,235.00 (usft) Hole Size: 6.125 (in) P1001Ndvattsttnt Pipe Movement: RECIPROCATING Rotating Time (Start -End): RPM: Rotating Torque (init/av /max ) (ft-Ibf) Reciprocating Time (Start -End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: FlUldNmn6. : ap"191111f ttM1L(tpt Slurry Type: SPACER Purpose: SPACER Yield: Class: Description: MUD PUSH II Density: 12.00 (ppg) Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: Other Volume: Total Vol in Well: Slurry Volume: 30.0 (bbl) Excess Measured From: Mud Type: Gels 10 Sec: 6.000 (Ibf/100112) Density: Gels 10 Min: 8.60 (ppg) PV: 4.00 (cp) YP: 15.000 (Ibf/l00ft-) Viscosity: 36.00 (s/qt) 7.000 (Ibf/10011') Fluid Name: CEMENT Flalds (g of 2) Slurry Type: CEMENT Purpose: PRIMARY Yield: Class: G -CLASS Description: TAIL SLURRY Density: 15.80 (ppg) 1.1700 (ft'/sk) Mix Water Ratio: 5.226 (gal/sk94) Excess: 30.00(%) Mix Method: BATCH Sacks Used: 264.00 (941b sacks) Water Volume: 32.8 (bbl) Excess Slurry Volume: 12.7 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: 53.0 (bbl) Slurry Volume: 55.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Gels 10 Sec: 6.000 (Ibf/100ft-) Density: 8.60 (ppg) PV: 4.00 (cp) YP: 15.000 (Ibf/100ft-) Viscosity: 35.00 (s/qt) Gels 10 Min: 7.000 (Ibf/10011') Name Type Amount Units Concentration Unit D047 ANTIFOAM AGENT GAUSX D065 DISPERSANT 0.200 D600 G GAS -BLOCK 0.900 % BWOC D167 FLUID LOSS 2.000 GAUSX D800 RETARDER AID 0.100 % BWOC 0.220 % BWOC Printed 10/20/2016 3:53:14PM Printed 10/20/2016 3:53:14PM North America - ALASKA - BP Page 2 of 2 Cementing Report Common Well Name: 14-28 / 02 Report no.: 2 Report date: 9/22/2016 Project: Prudhoe Bay Site: PB DS 14 Spud Date/Time: 3/4/1982 AFE No.: X3 -017TH -C: (2,346,215.00) Event Type: COM- ONSHORE (CON) Start Date: 9/22/2016 End Date: 9/25/2016 Contractor: PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 9/25/2016 UWI: 500292070800 Active datum: 14-28 Actual @88.48usft (above Mean Sea Level) -- Fluid Tests Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. M temp. (cc/30min) temp, press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) (min) si) °F) min 7.27 90.00 0.00 80.00 16.0 180.00 1,000.00 Stages - Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Floal Pressure Returns Circulate Cmt Vol to TotalAnnular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Held Held Prior Surface Mud Lost Flow (gpm) (psi) (psi) (min) (hr) (bbl) (bbl) ) After 1 PRIMARY CEMENT 9,031.00 11,235.00 Y Y y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbl/min) (usft) (usft) (bbl/min)(scf) Tests Casing Test Shoe Test Liner Top Test Test Pressure: 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: (hr) How Determined: Printed 10/20/2016 3:53:14PM PTP 7-14-01z- Loepp, Victoria T (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, March 08, 2016 1:47 PM To: Loepp, Victoria T (DOA) Subject: Initial list of wells to be drilled by different rigs than previously approved Follow Up Flag: Follow up Flag Status: Flagged Victoria, Here is the list of wells that are currently set to change rigs from the original Permit to Drill or Sundry. Moving from Nordic 1 to Nordic 2: S-1121-1 (PTD #215-222) — Planned date early of April U-06131-1 (PTD #215-123) Sundry #316-156 — Planned date of mid April H -27B (PTD # unknown) — Planned date of late June Moving from Parker 273 to Parker 272: A -29A (PTD #215-202) — Planned date of late March 14-28B (PTD #216-014) — Planned date of mid August H -25A (PTD # unknown) — Planned date of mid September I'll continue to keep you posted as possible additional schedule changes could occur. Please let me know if you have any questions or need additional information. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 -------------------------------------------------------------------------------------------- rnr. BP Exploration Alaska 1900 E. Benson Blvd. IRoom: 788DJAnchorage, AK -------------------------------------------------------------------------------------------- PTD 2!�--o!+ Loepp, Victoria T (DOA) From: Smith, James <James.Smith7@bp.com> Sent: Tuesday, February 23, 2016 11:17 AM To: Loepp, Victoria T (DOA) Cc: Lastufka, Joseph N Subject: RE: PBU 14-28B(PTD 216-014) Anti -collision Follow Up Flag: Follow up Flag Status: Flagged Hi Victoria, I wanted to update you on the 3 wellbores (14-05A, 14-10, and 14-118) that were mentioned in the PTD. We were able to gyrosurvey each of these 3 wellbores and this did reduce the uncertainty associated with their positions. All 3 now pass BP's Major Risk Criteria and will not need to be Minor Risked by setting plugs and shutting them in. Please let me know if you have any additional questions regarding this. Thanks, Jimmy Jimmy Smith Drilling Engineer — IPA Rotary BPXA James. smith7 aabo.com Office: (907) 564-5616 Work Cell: (907) 887-9347 Personal: (770) 503-5886 From: Smith, James Sent: Monday, January 25, 2016 9:15 AM To: 'Loepp, Victoria T (DOA)' Subject: RE: PBU 14-28B(PTD 216-014) Anti -collision Victoria, As it currently stands, these 3 wellbores fail BP's Major Risk criteria and will have to be Minor Risked by setting a tubing tail plug in each and shutting them in. The hope is that by running a gyro in each of these wells it will reduce the uncertainty and these wells will then pass the major risk criteria. This will allow us to not have to set the plug and shut these wells in. Please let me know if you have any further questions. Thanks, Jimmy Jimmy Smith Drilling Engineer — IPA Rotary BPXA James. smith7(aD_bp.com Office: (907) 564-5616 Work Cell: (907) 887-9347 Personal: (770) 503-5886 From: Loepp, Victoria T (DOA) [ma iIto: victoria. loepp@alaska.g ] Sent: Monday, January 25, 2016 8:49 AM To: Smith, James Subject: PBU 14-28B(PTD 216-014) Anti -collision Jimmy, In the anti -collision section the comment is made that a gyro will be run pre -rig in three wellbores in an attempt to clear up the anti -collision risk failure. Please explain. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loepp(c)alaska.gov CONFIDENTIALITY NOTICE. This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov THE STATE ofA 1., ASKA GOVERNOR BILL WALKER Mary Endacott Engineering Team Lead BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907,279.1433 Fax: 907.276.7542 www.cogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-28B BP Exploration (Alaska), Inc. Permit to Drill Number: 216-014 Surface Location: 2342' FNL, 822' FEL, SEC. 09, TION, R14E, UM Bottomhole Location: 2502' FNL, 1107' FWL, SEC. 10, TION, R14E, UM Dear Ms. Endacott: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, ,11 . Cathy . Foerster Chair DATED this 2iday of January, 2016. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS' PERMIT TO DRILL 20 AAC 25.005 ■ lffimVrr■ V MV JAN 2 0 2016 la. Type of Work: 1b.. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil 0 ' Service - Winj ❑ Single Zone 0 ' Coalbed Gas ❑ Gas Hydrates ❑ Redrill 0 Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket D 'Single Well ❑ 11 . Well Name and Number: BP Exploration (Alaska), Inc Bond No. 6194193 PBU 14-28B 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 11160 • TVD: 8950 PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well Governmental Section): ( ) 7. Property Designation (Lease Number): ADL 028312 8. Land Use Permit: 13. Approximate spud date: Surface: 2342' FNL, 822' FEL, Sec. 09, T10N, R14E, UM Top of Productive Horizon: 1932' FNL, 4797' FWL, Sec. 10, T10N, R14E, UM 77-043 April 18, 2016 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 2502' FNL, 1107' FWL, Sec. 10, T10N, R14E, UM 14200 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 89.55 - feet 15. Distance to Nearest Well Open Same Pool: to o S S Surface: x- 675678 • y- 5938009. Zone - ASP 4 GL Elevation above MSL: 42.6 feet 16. Deviated wells: Kickoff Depth: 3700 ' feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 109 degrees Downhole: 3342 Surface: 2452 18, Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casino Weiqht Grade Coupling Len th MD I TVD MD I TVD(including stage data 8-1/2" 7" 26# L-80 VamTop HC 5634 3550 3550 9184 8398 244 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr85 VamTon 2126 9034 8257 11160 8950 249 sx Class'G' 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): 1 Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 11974 8891 11170,11380 11170 8883 None Casing Length Size Cement Volume MD TVD Conductor/Structural 83 20" 400 sx Permafrost II 32-115 32-115 Surface 2465 13-3/8" 1524 sx Arctic Set III, 400 sx AS 1 31 -2496 31 -2496 Intermediate 9591 9-5/8" 500 sx Class'G', 300 sx AS 1 29-9620 29-8813 Liner 5180 7" 725 sx Class'G'. 350 sx Class'G' 4488-9668 4434-8860 Liner 2689 2-3/8" 54 sx Class'G' 8985-11674 8211 -8888 Perforation Depth MD (ft): 11410 - 11600 Perforation Depth TVD (ft): 8890-8884 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Smith, James from without prior written approval. Email James.Smith7@bp.com Printed Name Mary Endacott Title Engineering Team Leader Signature 22&P gvwc Phone +1 907 564 4388 Date r Commission Use Only Permit to Drill Number: API Number: 50- 029-20708-02-00 Permit Approval Date: I See cover letter for other requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbedmeJt�}ane, gas hydrates, or gas contained in shales: L7 Other: 06 P fC5 t 1/p 3500 p5 /9 Samples req'd: Yes El No No Ld Mud log req'd: Yes ❑ No G/ J re rf r> f e -y $ H2S measures Yes Gd No Directional svy req'd: Yes l/ No ❑/ f 19 —❑/ -f-0Z SOC7 PS/ia Spacing exception req'd: Yes ❑ No Isf Inclination -only svy req'd: Yes El No C/ Rzl//CGt/ GcYti�jGoJ6//5%ar r-rnorf w % ftp LZ CL a f f C t— Post initial injection MIT req'd: Yes ❑ No t7 f"�S rlvvl n lam{—G5_h} /4-!O ancj /4-11 13 J APPROVED BY Approved COMMISSIONER THE COMMISSION Date: by:�1c�,�� �T 11A ORIGINAL Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and Attachments in Duplicate � /" 14, To: Alaska Oil & Gas Conservation Commission From: Jimmy Smith, ODE Date: January 15, 2016 RE: 14-28B Permit to Drill The 14-28B well is scheduled to be drilled by Parker 273 in April 2015. This sidetrack targets a 70' oil column that has been logged in the current 14-29 well above the current perfs in that well. The 14-29 production section is inaccessible due to multiple fish lost in the wellbore. Three fishing attempts — 2 with coil and 1 rotary were unsuccessful. A rotary sidetrack was decided on to access the stranded attic oil. 14-28B will be an upper Zone 4B horizontal producer with offtake points deeper in the reservoir at the toe and heel section of the sidetrack, along with the ability to replace the 14-29 Zone 4 perfs if needed in the future. The well will have a single large undulation with one invert in the heel and a long flat revert to a turn down at the toe of the well. The planned well is a two string design using 7" intermediate liner, and a 4-1/2" production liner. The kick-off point will be in the SV2 formation. The intermediate liner will be set at the top of the Sag River, and the production interval will be completed with a cemented liner and perforated. The maximum anticipated surface pressure from the TCGL with a full column of gas from TD to surface is 2,452 psi (assumes 7.22 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The well will be drilled by Parker 273 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3,500 psi. A detailed operations summary is included with the permit application. If there are any questions concerning information on 14-28B, please do not hesitate to use the contact information below. Jimmy Smith Office: (907) 564-5616 Cell: (907) 887-9347 Email: james.smith7(a�bp.com Attachments: Well Bore Schematic Proposed Pre -Rig Schematic Proposed Completion Directional Package BOPE Schematic As -Built Survey Well Head Schematic Tree Schematic 14-28B PTD 1 1/15/2016 Planned Well Summary Taret Well 14-28B Wele Producer Ob ect ve Ivishak Current Status Shut -In Estimated Start Date: 1 4/18/2016 1 1 Time to Complete: 1 25.0 Days Surface Northing Easting IOffsets I TRS Location 5,938,008.70 675,677.82 2342.0' FNL / 822.3' FEL 1 1 ON 14E Sec 9 Tie in Northing Eastin Offsets TRS (Sidetrack Point) 51937,993.68 675,694.75 2357.4' FNL / 805.7' FEL 1 O 14E Sec 9 Planned KOP: 3,700' MD Planned TD: 11,160' MD / 8,860' TVDss Rig: Parker 273 GL -RT: 46.95 RTE ref MSL): 1 89.55 Directional - Baker wp08b KOP: 3700' MD Northing Easting TVDss Offsets TRS Tgt 1 5,938,426.45 676,006.94 8,590 1931.9' FNL / 482.6' 1 ON 14E Sec 9 TSGR 3700-4100 Inclination + known azi trend FEL MWD Standard Tgt 3 5,937,893.72 677,610.89 8,860 2502.3' FNL / 4172.4' 10N 14E Sec 10 BHL 9184-10130 MWD +IFR + Multi Station W/O crustal FEL MWD Standard Planned KOP: 3,700' MD Planned TD: 11,160' MD / 8,860' TVDss Rig: Parker 273 GL -RT: 46.95 RTE ref MSL): 1 89.55 Directional - Baker wp08b KOP: 3700' MD Maximum Hole Angle: -35° in the intermediate section -1090 in the production section Close Approach Wells: None. All offset wells pass BP Anti -collision Scan Criteria. 118 -3700 Gyrodata cont. casing m/s 3700-4100 Inclination + known azi trend 4100-5600 MWD Standard Survey Program: 4100-9184 MWD +IFR + Multi Station W/O crustal 9184-10130 MWD Standard 9184-10130 MWD +IFR + Multi Station W/O crustal 10130 -11160 MWD Standard 10130 -11160 MWD +IFR + Multi Station W/O crustal Nearest Property Line: 14,200' Nearest Well within Pool: -100'(14-29) 14-28B PTD 2 1/13/2016 Formation Tops and Pore Pressure Estimate (SOR) Formation Estimated Formation Top TVDss Most Likely Pore Pressure EMW Fluid Type (for sands) SV4 -2,622 8.50 Water SV3 -3,148 8.50 Water SV2 -3,338 8.50 Water Kickoff -3,609 8.50 n/a SV1 -3,743 8.50 Water UG4 -4,351 9.40 Water UG4A -4,380 9.40 Water UG3 -4,527 9.40 Water UGI -5,140 9.40 Water WS2 -5,711 8.50 Water WS1 -6,037 8.50 Water CM3 -6,200 9.10 Water CM2 -6,755 9.40 Water CM1 -7,367 10.00 Water THRZ -7,759 10.00 Water BHRZ -7,916 10.00 Water TKNG -7,952 10.00 Water TJB -8,408 10.10 Water TSGR -8,590 7.18 Oil/ Water TSHU -8,615 7.18 Oil/ Water TSAD -8,690 7.18 Oil/ Water 42N -8,842 7.19 Oil/ Water TCGL -8,903 7.22 Water 14-28B PTD 3 1/13/2016 Casing/Tubing Program Hole Size Liner / WVFt Grade Conn Length Top Bottom PV (cp) Tbg O.D. API FL HTHP FL M13T pH MD / TVDss MD / TVDss 8-1/2" 7" 26# L-80 VamTop HC 5,484' 3,550'/ 3,460' 9,184'/ 8,594' 10-15 18-24 <8 NA <20 9-10 (150' lap) 10.8-10.9 6-1/8" 4'/2" 12.6# 13Cr-85 VamTop 2,126' 9,034'/ 8,471 11,160' / 8,860' (150' lap) Tubing 4'/2" 12.6# 13Cr-85 VamTop 9,034' Surface 9,034'/ 8,471' (-5' into liner TBS) Mud Program Intermediate Mud Properties: LSND 6-1/8" Hole Section Depth Interval Density PV (cp)b/1�z 8-1/2" Hole Section Depth IntervalDensity HTHP FL PV (cp) Ib! QQfE2 YP API FL HTHP FL M13T pH Window Milling 9.5 10-15 26-32 <8 NA <18 9-10 KOP - THRZ 9.6-10.2 10-15 18-24 <8 NA <20 9-10 THRZ - TD 10.8-10.9 10-15 17-22 <4 <10 <20 9-10 Production Mud Properties: Water Based Polymer Fluid 6-1/8" Hole Section Depth Interval Density PV (cp)b/1�z yp API FL HTHP FL MBT pH 7" Csg Shoe - TD 8.5-9.0 <8 12-20 <12 NA <4 1 8.5-9.5 Logging Program F „ r f , Drilling: Dir/GR/GRAB/RES Oen Hole: None Cased Hole: Contingency USIT in cement evaluation mode from 7" shoe to TOC in the event something goes wrong on the cement job 14-28B PTD 4 1/15/2016 Cement Program Casing Size 7" 26# L-80 mTop Intermediate Liner Lead None Basis Lead TOC N/A Basis Tail Open hole volume + 40% excess + 80 ft shoe track Tail TOC 1500 ft MD above casing shoe Spacer -30 bbls of Viscosified Spacer weighted to -12.0 Mud Push II Total Cement Lead None Volume Tail 50.8 bbls, 285 cult, 244 sks 15.8 lb/gal Class G - 1.17 cuft/sk Temp BHST 216° F Casing Size 4-1/2" 12.6# 13CR VamTop Production Liner Lead None Lead TOC N/A Basis Tail Open hole volume + 30% excess + 80 ft shoe track Tail TOC Top of Liner Spacer -25 bbls of Viscosified Spacer weighted to -11.0 Mud Push 11 Total Cement Lead None Volume Tail 51.8 bbls, 291 cuft, 249 sks 15.8 lb/gal Class G - 1.17 cuft/sk Temp BHST 222° F Surface and Anti -Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Sub -Surface Pressure Management: Jurassic/Cretaceous: Check pressure estimates and verify that injection rates have not changed prior to spud in the closest injection wells. No wells need to be shut in for pressure management. Ivishak Interval: SBHP in 14-29 will be obtained prior to spud to validate most likely pore pressure. Anti -Collision: / All offset wells pass BP Anti -collision Scan Criteria, however, multiple wells have been minor risked to J mitigate HSE risk. See attached A/C summary for more details. 14-05, 14-05A, 14-10, 14-11, 14-11A, 14-11AL1, 14-11APB1, and 14-11B have been minor risked to mitigate HSE risk. These three wellbores (14-05A, 14-10, and 14-11 B) will have a gyro run pre-ng,in an attempt to clear up the anti -collision major risk failure. If the major risk A/C scan still fails after the gyros have been run, then all three wells will havef a tubng tail plug set and be shut in while drilling the intermediate interval. 14-29 has also been minor risked to mitigate HSE risk and will be shut-in while drilling the production interval Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. 14-28B PTD 5 1/13/2016 Loepp. Victoria T (DOA) From: Smith, James <James.Smith7@bp.com> Sent: Monday, January 25, 2016 9:15 AM To: Loepp, Victoria T (DOA) Subject: RE: PBU 14-28B(PTD 216-014) Anti -collision Victoria, As it currently stands, these 3 wellbores fail BP's Major Risk criteria and will have to be Minor Risked by setting a tubing tail plug in each and shutting them in. The hope is that by running a gyro in each of these wells it will reduce the uncertainty and these wells will then pass the major risk criteria. Th�jts will allow us to not have to set the plug and shut these wells in. Please let me know if you have any further questions. rZ V -r "'- '"�� '� 0 Zz C �- Thanks, Jimmy Jimmy Smith Drilling Engineer — IPA Rotary BPXA James. smith 700D.com Office: (907) 564-5616 Work Cell: (907) 887-9347 Personal: (770) 503-5886 From: Loepp, Victoria T (DOA)[mailto:victoria.loeppCa)alaska.gov] Sent: Monday, January 25, 2016 8:49 AM To: Smith, James Subject: PBU 14-28B(PTD 216-014) Anti -collision Jimmy, In the anti -collision section the comment is made that a gyro will be run pre -rig in three wellbores in an attempt to clear up the anti -collision risk failure. Please explain. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loepp(d)alaska.gov Hydrogen Sulfide J DS14 is considered an H2S site. Recent H,S data from the pad is as follows: Faults Formation Where MD Fault Encountered Intersect Well Name H2S Level Date of Reading Parent Well (if sidetrack) 14-28A 38 ppm 04/17/2012 #1 Closest SHL Well H2S Level 14-29 40 ppm 01/03/2014 #2 Closest SHL Well H2S Level 14-30A 118 ppm 01/13/2015 #1 Closest BHL Well 1-12S Level 14-29 40 ppm 01/03/2014 #2 Closest BHL Well H2S Level 14-39 0 ppm 06/28/1993 #3 Closest BHL Well H2S Level 14-12 58 ppm 01/03/2015 #4 Closest BHL Well 112S Level 14-11A 60 ppm 02/08/2012 Max Recorded H2S on Pad/Facility Field Wide Max (R-19) 1 1100 ppm Faults Formation Where MD Fault Encountered Intersect TVDss Throw Direction and Intersect Magnitude Uncertainty Lost Circ Potential CM1 8,045 -7,660 90' DTS +/- 150' Med Z48 10,610 -8,720 7' DTW +/-50 Low Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. 14-28B PTD 6 1/13/2016 Well Control The 8-1/2" hole and 6-1/8" hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. V BOP test frequency for 14-28B will be 14 days with function test every 7 days during the drilling phase and 7 days during Sundry operations. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-1/2" Intermediate Interval Maximum anticipated BHP 3,207 psi at the TSGR at 8,590' TVDss (7.18 ppg EMW) Maximum surface pressure 2,348 psi at the TSGR (0.10 psi/ft gas gradient to surface) Kick tolerance 25 bbls with 12.5 ppg frac gradient. Kick tolerance Assumes 7.18 ppg pore pressure in the SGR + 0.5 ppg kick Integrity Test — 6-1/8" hole intensity and 10.8 ppg MW. Planned BOP test pressure Rams test to 3,500 psi / 250 psi. Planned completion fluids Annular test to 3,500 psi / 250 psi Integrity Test — 12-1/4" hole No LOT will be performed out of 9-5/8" window — original 13-3/8" LOT was 12.5 pp 9-5/8" Casing Test 3,500 psi surface pressure 6-1/8" Production Interval Maximum anticipated BHP 3,342 psi in the TCGL at 8,903' TVDss 7.22 ppg EMW) Maximum surface pressure 2,452 psi 0.10psi/ft gas gradient to surface Kick tolerance Infinite with > 9.0 ppg frac gradient. Assumes an 7.22 ppg max pore pressure in the TCGL + 0.5 ppg kick intensity and 8.6 ppg MW. Planned BOP test pressure Rams test to 3,500 psi / 250 psi. Annular test to 3,500 psi / 250 psi Integrity Test — 6-1/8" hole FIT after drilling 20'-50' of new hole 4-1/2" Liner Top Packer 3,500 psi surface pressure Planned completion fluids 8.5 ppg seawater / 2,200 ft diesel to 2,200 ft TVDss 14-28B PTD 7 1/13/2016 Drill and Complete Operations Summary Proposed Pre -rig prep work: 1. S Pull DGLV from station 5 at 8959' MD 2. F CMIT-IA to 2500 psi 3. F Circulate Lateral Cement Plug into Tubing and IA. -50 bbls of 15.8 Class G. TOC 7500' (length -1500' MP) 4. S D&T Cement. Drift for Jet Cut 5. F CMIT-TxIA to 3500 psi, MIT -OA to 1200 psi 6. E Jet Cut Tubing at 4000'. Planned KOP is 3700' MD. 7. D Bleed TWO to 0 psi 8. O Cement Control Lines 9. O PT Control Lines 10. W PPPOT-T to 5000 psi, PPPOT-IC to 3500 psi. Function LDS. 11. V Install Dry Hole Tree. Install Annulus Valves. Set TWC. Proposed Drilling Operations: 1. MIRU Parker 273. 2. Test TWC from above and below to 3,500 psi for 5 minutes each. 3. Nipple down tree. Nipple up BOPE and test to 3,500 psi. (Configured from top to bottom: annular preventor, 7" fixed rams, blind/shear, mud cross, 2-7/8" x 5-1/2" VBR) 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean seawater 6. Pull 5-1/2" x 4-1/2" tubing from the pre -rig cut. 7. Perform 9-5/8" cleanout run to tubing stub. 8. R/U E -line. RIH w/ GR/CCL and 9-5/8" EZSV for 47# casing. Set the EZSV at -3716 MD__ (competent sand / confirm with GR) as required to avoid cutting a casing collar while milling the window. POOH. Rig down E -line. 9. Pressure test the EZSV to 3500 psi for 30 min and chart. 10. Nipple down BOPE and old tubing spool. Change out 9-5/8" packoff and nipple up new tubing spool and BOPE. Test packoff and breaks. 11. PU and RIH with 9-5/8" Baker bottom -trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 12. Displace the well to 9.5 ppg LSND based milling fluid prior to 9-5/8" casing milling operations and other path -forward 8-1/2" drilling operations. 13. Mill a window in the 9-5/8" casing at 3700' MD'. 14. POOH for drilling BHA. 15. MU an 8-1/2" Rotary Steerable drilling BHA with DIR/GR/RES/PWD/GR-at-bit. RIH 16. Drill 8-1/2" intermediate interval to weight up point above HRZ 17. Continue drilling to 7" casing point at the top of the Sag River. NOTE: Plan to weight -up the mud with spike fluid to a 10.8 ppg over 2 circulations per procedure, prior to drilling into the HRZ. 18. Circulate well clean, short trip to bring bit to GR TD, run back to TD, circulate wellbore clean. POOH for 7" drilling liner. 19. Run a 7", 26#, L-80, Vam-Top HC drilling liner back into the 9-5/8" casing with minimum of 150' liner lap. Cement 7" liner with 15.8 ppg class G cement. Displace cement with mud. 20. Set hanger and liner top packer. Release Miner & circulate BU, POOH, L/D liner running tool. 14-28B PTD 8 1/13/2016 21. After cement has reached a minimum 500 psi compressive strength, test the 9-%" casing X 7" liner to 3,500psi for 30 minutes and record the test. 22. Change out 7" rams to VBR's and test to 250 psi / 3,500 psi. 23. MU a 6-1/8" RSS BHA with DIR/GR/RES/DEN/NEU with a PDC bit and RIH to the 7" landing collar. 24. Displace well to the planned 8.5 ppg DIF and monitor well for 30 minutes as a negative test on the liner lap. 25. Drill out the 7" shoe plus 20' of formation. Pull into the shoe and perform an FIT. 26. Drill the 6-'/" production build and lateral as per directional plan. Circulate well clean, short trip as needed, and POOH. 27. Run 4-1/2", 12.6# 13Cr VamTop liner to TD. 28. Cement liner to TOL with 15.8 ppg Class G cement. 29. Set liner top packer and hanger. 30. Displace wellbore to clean seawater and circulate excess cement above TOL. 31. POOH and LD liner running tool. 32. Pressure test liner/packer/casing to 3,500 psi for 30 minutes. 33. RU DPC pert guns, RIH, and perforate liner. 34. RU and run 4-1/2", 12.6# 13Cr VamTop completion per the tally. Tag up in PBR, space out, and land tubing hanger. RILDS. 35. Displace tubing and IA to clean seawater. 36. Reverse circulate in heated seawater and inhibited seawater to IA and tubing (surface to surface). 37. Drop ball & rod and set production packer. Individually test tubing and IA to 3,500 psi for 30 minutes each. 38. Shear DCK valve. 39. Reverse circulate in diesel freeze protect down IA using rig's injection pump. 40. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. 41. Install TWC and test from above to 250 psi low / 3,500 psi high for 5 minutes each and below to 250 psi low / 3,500 psi high for 5 minutes each. 42. N/D BOPE. NU adapter flange and double master valves. Test to 5,000 psi with diesel. 43. Ensure Heet is left on top of TWC and only diesel is left in the tree. 44. Install all annulus valves and secure the well. 45. RDMO Post -Rig Operations 1. Change out dry hole tree for production tree. 2. DSM to pull TWC. 3. MI/RU slick line. Pull TWC, ball and rod, and RHC plug. Pull shear valve and dummy GLVs Install GLVs. 4. Flowback, per ASRC. 5. Modify S -riser as required. 6. Install flow lines and well house. 14-28B PTD 9 1/13/2016 14-28B Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures A. Production Hole: The Ivishak is expected to be at a 7.22 ppg EMW. Reservoir pressures will be controlled by using 8.5 — 9.0 ppg water based mud. II. Lost Circulation/Breathing A. Intermediate Hole 1: Breathing and/or lost circulation associated with excessive circulating pressures should be considered a possibility on this well. A fault crossing in the CM1 may increase the possibility of these events. B. Production Hole: There is 1 expected fault crossing in the production hole which is considered to have a low potential for lost circulation. Past wells on DS -14 have experienced severe lost circulation. III. Fault Locations Formation Where MD Fault Encountered Intersect TVDss Intersect Throw Direction and Magnitude Uncertainty Lost Circ Potential CM1 8,045 -7,660 90' DTS +/_ 150' Med Z46 10,610 -8,720 7' DTW +/-50 Low IV. Integrity Testing Test Point Test Depth Testtype EMW (lb/gal) 9-5/8" Window No LOT will be performed N/A Original LOT - 12.5 ppg T' shoe 20'-50' from the 7" shoe FIT 8.9 ppg V. Hydrogen Sulfide Drillsite 14 is considered an H2S site. Recent H,S data from the nad is as follows - VI. Anti -Collision Issues All offset wells pass BP Anti -collision Scan Criteria, however, multiple wells have been minor risked to mitigate HSE risk. See attached A/C summary for more details. 14-05, 14-05A, 14-10, 14-11, 14-11A, 14-11AL1, 14-11APB1, and 14-11B have been minor risked to mitigate HSE risk. These three wellbores (14-05A, 14-10, and 14-11 B) will have a gyro run pre -rig in - an attempt to clear up the anti -collision major risk failure. If the major risk A/C scan still fails after the gyros have been run, then all three wells will have a tubing tail plug set and be shut in while drilling the intermediate interval. 14-29 has also been minor risked to mitigate HSE risk and will be shut-in while drilling the production interval CONSULT THE DRILLSITE 14 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 14-28B PTD 10 1/13/2016 Well Name H2S Level Date of Reading Parent Well (if sidetrack) 14-28A 38 ppm 04/17/2012 #1 Closest SHL Well 112S Level 14-29 40 ppm 01/03/2014 #2 Closest SHL Well H2S Level 14-30A 118 ppm 01/13/2015 #1 Closest BHL Well H2S Level 14-29 40 ppm 01/03/2014 #2 Closest BHL Well H2S Level 14-39 0 ppm 06/28/1993 #3 Closest BHL Well H2S Level 14-12 58 ppm 01/03/2015 #4 Closest BHL Well H2S Level 14-11A 60 ppm 02/08/2012 Max Recorded H2S on Pad/Facility Field Wide Max (R-19) 1100 ppm VI. Anti -Collision Issues All offset wells pass BP Anti -collision Scan Criteria, however, multiple wells have been minor risked to mitigate HSE risk. See attached A/C summary for more details. 14-05, 14-05A, 14-10, 14-11, 14-11A, 14-11AL1, 14-11APB1, and 14-11B have been minor risked to mitigate HSE risk. These three wellbores (14-05A, 14-10, and 14-11 B) will have a gyro run pre -rig in - an attempt to clear up the anti -collision major risk failure. If the major risk A/C scan still fails after the gyros have been run, then all three wells will have a tubing tail plug set and be shut in while drilling the intermediate interval. 14-29 has also been minor risked to mitigate HSE risk and will be shut-in while drilling the production interval CONSULT THE DRILLSITE 14 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 14-28B PTD 10 1/13/2016 3 -LEAD= GRAY —F" -R ATOR = AXELSON 9226' ELEV = 71' 9238'3 B -EV = -1/2 - LOC SEAL ASSY W/O SEALS 5-1/2' TBG, 17#, - IP= 3809 L-80..0232 bpf, x Angle = 112' @ 1069T D = 4.892" tum MD = 9689 9314' tum TVD = 8800' SS 20" CONDUCTOR 1 R!6HJMIDj SET WFD CBP(12/08/12) 9323' 94#, B40, ID = 19.124" 13-3/8" CSG, 72#, L-80 BUTT, D = 12.347" L 4-1/2- TBG, 12.6#, L-80_0152 bpf, ID= 3.958- 9-5/8' X 7" LTP w / LNR HGR & TIEBACK SLV. D = 625" 9-5/8" CSG, 47#, L-80 BTC XO TO SOO-95 BTC Minimum ID =1.78" @ 8989' SELBRT PLUG BUSHING 3-1/2" TOP OF CEMENT 13-1/2" TBG, 9.3#, L-80_0087 bpf, D = 2.992" 1 7" SCAB LNR 29#, L-80 AB MOD -BTC, .0371 bpf, D = 6.184" SAFFrY NOTES: WELL ANGLE> 70* C� 9930* 14-28A I W: t-28 NOT SHOWN BELOW WHIPSTOCK— ORIG 23'23' S 1/2^ X 4-1/2" XO, D = 4.892" [r= 2185' 4-1 /2" CAM BAL-0 SV LN NP, D = 3.813- 110, L 4401' 4-1/2" X 3-1/2" XO, D = 2.992" GAS LIFT MANDRELS 2494' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3003 3003 0 TGPD DONE RK 16 10/25/15 4401 • 1 2 5401 5186 36 TGPDX SO RK 20 10/25/15 3 6754 6285 35 TGPDX DMY RK 0 09/09/96 4486' 4 7709 7077 32 TGPDX DMY RK 0 05/18/11 5 8959 8187 21 TGPDX DMY RK 0 09/09/96 6 -9080 8300 21 TGPDX DMY RK 0 09/09/96 8604• 'GLM #6 Behind CTDLNR& Inaccessible 8985' 35 BKR KB LTP, D = 1.875" (10/25111) 8989' 2.70" DEPLOY MEM SLV, D = 1.780" 9201' 1 8989' 1 1 9238' 1 1 9314' 1 TOP OF 7" LNR 1-1 9314- 3-1/2- TBG -PC, 9.3#, L-80_0087 bpf, D = 2.992" 1—{ 9333' 9-5/8" CSG, 47#, SOO-95 BTC, ID = 8.681" 1-1 9618' PERFORATION SLANAARY REF LOG BH MIND ON 10/17/2011 ANGLE AT TOP PERF: 87" @ 11201' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 1-14/25" 6 111201-11250 S 10/23/11 10/21/15 1-14/25" 6 11410-11600 C 10/23/11 7" WHIPSTOCK SET @ 9667' (10/05/11) 7" LNR 29#, L-80 BTC, .0371 bpf, D = 6.184" E966T 2-3/8" SLB SQZCRETE CMT (10/21/15) ? — FBTD 11649' -3/8" LNR 4.4#, L-80 STL, .0039 bpf, D = 1.995" I—i 11674' 9332' -- 3 -yr BKR SWAROUT SUB SND 9333' 3-1/2- WLEG, D = 2.992- 1 CT LNR 9328' H ELMD TT LOGGED 06/30/90 WiILLOUT WINDOW (14-28A) 9668' - 9673' 11170' —12-3/8" WFD CMT RETAINER (10/21/15) 1138W 2-318" WFD CBP (12/08112) j DATE X 4 1/2- BKR S-3 PKR D = 3.875" BEHND —F" REV BY COKWENTS CT LNR 9226' 05/28/14 3-1/2" HES XN NP, MILLED TO 2.80" (09/11/11) 9238'3 12/07/15 -1/2 - LOC SEAL ASSY W/O SEALS 9241' D-16 RWO 7" X 3 112" BKR FB 1 PKR ASSY , D = 4.00" 9255' S' MILLOUT (7CTBy510N D = 4.50" 9260' 5-1/2" x 3-1/2" XO, D = 2.992" 12/22/111 9314' 9-5t8" X 7" BKR LTP & TRACK SLV, D = ? 12/13/12 1 R!6HJMIDj SET WFD CBP(12/08/12) 9323' 3-1/2" OTIS XN NP, MILLED TO 2.80" (09/11/11) 9332' -- 3 -yr BKR SWAROUT SUB SND 9333' 3-1/2- WLEG, D = 2.992- 1 CT LNR 9328' H ELMD TT LOGGED 06/30/90 WiILLOUT WINDOW (14-28A) 9668' - 9673' 11170' —12-3/8" WFD CMT RETAINER (10/21/15) 1138W 2-318" WFD CBP (12/08112) j DATE REV BY 0OMu3ITS DATE REV BY COKWENTS 03124/82 PKR 191 ORIGINAL COMPLETION 05/28/14 LECIJMD GLV CJO (05/23/14) 01/08/90 NORDIC 1 RWO 12/07/15 BLS/JMD SET CMT REVRAN CMT (10/21) 09109/96 D-16 RWO 12107/15 JMIWJMDGLV C/O (10/25/15) 10126/11 NORDIC2 CTD 12/22/111 MP/JMD I DRLG DRAFT CORRECTIONS 12/13/12 1 R!6HJMIDj SET WFD CBP(12/08/12) PRUDHOE BAY LINT( WELL: 14-28A I PERMT No: "2111050 API No: 50-029-20708-01 SEC 9, T1 OR R1 4E, 2341' FNL & 82Z FEL BP Exploration (Alaska) FPTY TES: WELL ANGLE > 70* iLIATO = GRAY A 4 —2 8 B Pre -Rig I W 4--28 NOT SHOWN BELOW WHIPSTOCK'*" ORIG :TUATOR = AXELSON v ELEV = --- ---� 5-1/2" TBG, 17#, 23' )P= 3800' L-80 0232 b f x Angle = 112-@1009T 0=4.892- turn D=4.892" tum MD = 9680' tum TVD = 8800' SS 20" CONDUCTOR, 110' 94#, H-40, D = 19-124" 13-3/8" CSG, 72#, L-80 BUTT, D = 12.347" 2494' 4-1/2" TBG, 12.6#, L-80_0152 bpf, D = 3.958" 4401' 9-5/8" X 7" LTP w / LNR HGR 4486' & TIEBACK SLV, ID = 6-25" SOP OF CEMENT PLUG; - 9 -5/8" CSG, 47#, L-80 BTC XO TO SOO-95 BTC I-1 8604' 3-1/2" TOP OF CEMENT H 8989' 3-1/2" TBG, 9.3#, L-80_0087 bpf, D = 2.992" 1-1 9238' Minimum ID = 1.78" @ 8989' SELBRT PLUG BUSHING 7" SCAB LNR, 29#, L-80 AB MOD -BTC, 9314' .0371 bpf, D = 6.184" 3-1/2" TBG -PC, 9.3#, L-80_0087 bpf, D = 2.992" 19-5/8" CSG, 47#, SOO-95 BTC, D = 8.681" I 9333' 9618' PERFORATION SUMMARY REF LOG: BHI MWD ON 10/17/2011 ANGLE AT TOP PERF: 87" @ 11201' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 1-14/25" 6 11201-11250 S 10/23/11 10/21/15 1-14/25" 6 11410-11600 C 10/23/11 36 7" WHIPSTOCK SET @ 9667'(10/05/11) 7" LNR, 29#, L-80 BTC, .0371 bpf, D = 6.184"^'9667" 2-3/8'SLBSQZCREfECMT(10/21/15) — PBTD 11649' -3/8" LNR, 4.4#, L-80 STL, .0039 bpf, D = 1.995" 1-� 11674' 2185' 14-1/2" CAM BAL-O SVLN ND, D= 3.813" 4000'-1TUBING JET CUT GAS LIFT MANDRELS ST MD ITVDIDEV REV BY COMMENTS TYPE I VLV LATCH I PORT DATE 1 3003 3003 0 TGPD DOME RK 16 10/25/15 2 5401 5186 36 TGPDX SO RK 20 10/25/15 3 6754 6285 35 TGPDX DMY RK 0 09/09/96 4 7709 7077 32 TGPDX DMY RK 0 05/18/11 5 8959 8187 21 TGPDX DMY RK 0 09/09/96 6 *908018300 21 TGPDX DMY RK 0 09/09/96 *GLM #6 Behind CTDLNR& Inaccessible 8985' 35 BKR KB LTP, D = 1.875" (10/25/11) 9201' 9226' 9238' 9241' 7" X 4-1/2" BKR S-3 PKR, ID = 3-875" 3-1/2" HES XN NIP, MILLED TO 2.80" (09/11/11) 3-1/2" LOC SEAL ASSY W/O SEALS 7" X 3-1/2" BKR FB -1 PKR ASSY. ID = 4.00" 9314' I -J 9-5/8" X 7" BKR LTP & TIEBACK SLV, ID= ? 9333' H3-1/2" WLEG, D=2.992" MILLOUT WINDOW (14-28A) 9668' - 9673' 11170' 2-3/8" WFD CMT RETANER (10/21/15) 11380' 2-3/8" WFD CBP (12/08/12) DATE REV BY COMMENTS DATE REV BY COMMENTS 03/24/82 PKR 191 ORIGINAL COMPLETION 05/28/14 LEC/JMD GLV C/O (05/23/14) 01/08/90 NORDIC 1 RWO 12/07/15 BLS/JMD SET CMT REVRAN CMT (10/211 09/09/96 D-16 RWO 12/07/15 JMM/JMD GLV C/O (10/25/15) 10/26/11 NORDIC2 CTD 01/07/16 GJS PRE -RIG EDITS 12/22/11 MP/JMD DRLG DRAFT CORRECTIONS 12/13/12 RMH/JMD SET WFDCEP (12/08/12) PRUDHOE BAY UNIT WELL: 14-28A ill PERMIT No: 2111050 API No: 50-029-20708-01 SEC 9, TION, R14E, 2341' FNL & 822' FEL BP Exploration (Alaska) ILHFADz GRAY- FKUPUbt IJ SAFETY NOTES: WELL ANGLE > 70* @ 4-1/2" TUATOR. AXELSON 14-28B - C; VI SAFETY ------------ 71' ---------- ------- --------------------- x Angle --- turn MID------ ------- — ------ = ------------ t - urn - T - V D = ------ –I.– 8800'SS20" COND, 110, L 94#, 1+40, ID= 19.124" 113-3/8- CSG, 72#, L-80 BUTT, ID = 12.347" 2494' 9-518- —WHIPSTOCK Lj—1 -_) 1-1 3700' 9-5/8- CSG, 47#, SOO-95 BTC, ID = 8.681" 1–f --3700- Minimum ID 3550' -19-5/8- X 7- LNR F-r–P, ID = -- IIVILLOUT WINDOW (14-28B) 3700' - 3710' GAS LIFT MANDRELS iT MD I TVD DEV TYPE VLV LATCH PORT DA 6 5 4 3 2 1 14-112' HES X NIP, ID = 3.813" 1 7- X 4-1/2- HES TNT PKR ID = I PERFORATION SUMMARY REF LOG: ON -�4-1/2" HES X NIP, 1) = 3.813" Note: Refer to Production DB for historical pert data SIZE SPF O Opn/Sqz SHOT SQZ 101261111 SIDETRACK(14-28B) 4-1/2- HES XN NIP, ID = 3-725- 12109/151 JIVU BUILT PROPOSED I 7" X 5' BKR ZXPN LTP w 1TIEBACK SLV & BKR FLEXLOCK HGF ID 4-1/2" WLEG, ID = 3.958-7 LNK 26#, L-80 VAM TOP, 0383 bpf, 9) = 6.276" ELMD TT LOGGED FFX 4-1/2- XO, ID = 3.958" PERFORATION SUMMARY REF LOG: ON ANGLE ATTOP PERF: _'g Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 101261111 SIDETRACK(14-28B) 12109/151 JIVU BUILT PROPOSED I I PBTD 4-1/2- LNR,12.6#, 13-CRVAMTOP, 0 152 bpf, ID = 3.958' DATE REV BY CokqvuYTs DATE REV BY COMMENTS 03124/82 PKR 191 ORIGINAL COMPLETION 01108/90 NORDIC 1 RVVO 09109196 13-16 RWO 10126111 NORDIC2 CTD 101261111 SIDETRACK(14-28B) 12109/151 JIVU BUILT PROPOSED PRUDHOE BAY UNIT VVELL: 14-28B PEW No: API No: 50-029-20708-02 SEC 9, T1 ON, R14E, 2341' FNL & 822- FEL BP Exploration (Alaska) North America - ALASKA - BP Prudhoe Bay PB DS 14 14-28 Plan 14-28B Plan: 14-28B wp08b BP Well Plan Survey Report 12 January, 2016 sAcEae HUGHES Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor ri.i BAKER HUGHES Site PB DS 14, TR -10-14 BP by BP Well Plan Survey Repoli Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28B plan @ 89.55usft (P273) Site: PB DS 14 MD Reference: 14-28B plan @ 89.55usft (P273) , Well: 14-28 North Reference: True Wellbore: Plan 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B wp08b Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor ri.i BAKER HUGHES Site PB DS 14, TR -10-14 Site Position: Northing: 5,939,577.430 usft Latitude: 70° 14'26.346 N From: Map Easting: 674,150.480 usft Longitude: 148° 35'36.726 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.32 ° Well 14-28, 14-28 Well Position +N/ -S 0.00 usft Northing: 5,938,008.700 usft Latitude: 70° 14' 10.572 N +E/ -W 0.00 usft Easting: 675,677.820 usft Longitude: 148° 34'53.399 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 42.60 usft Wellbore Plan 14-28B Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2015 5/1/2016 19.07 81.01 57,533 Design 14-28B wp08b Audit Notes: Version: Phase: PLAN Tie On Depth: 3,618.55 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 46.95 0.00 0.00 94.74 1/12/2016 10:20:22AM Page 2 COMPASS 5000.1 Build 61 by BP /Ere BP Well Plan Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28B plan @ 89.55usft (P273) Site: PB DS 14 MD Reference: 14-28B plan @ 89.55usft (P273) Well: 14-28 North Reference: True Wellbore: Plan 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B wp08b Database: EDM R5K - Alaska PROD - ANCP1 Survey Tool Program Date 1/11/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 118.55 3,618.55 14-22 Srvy 2 GYD-GC-CMS (14-28) GYD-CT-CMS Gyrodata cont.casing m/s 3,618.55 3,700.00 14-28B wp08b (Plan 14-28B) GYD-CT-CMS Gyrodata cont.casing m/s 3,700.00 4,100.00 14-28B wp08b (Plan 14-28B) INC+TREND Inclinometer+ known azi trend 4,100.00 5,600.00 14-28B wp08b (Plan 14-28B) MWD MWD - Standard 4,100.00 9,184.00 14-28B wp08b (Plan 14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 9,184.00 10,130.00 14-28B wp08b (Plan 14-28B) MWD MWD - Standard 9,184.00 10,130.00 14-28B wp08b (Plan 14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,130.00 11,160.00 14-28B wp08b (Plan 14-28B) MWD MWD - Standard 10,130.00 11,160.57 14-28B wp08b (Plan 14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Planned Survey - - MD Inc Azi (azimuth) TVD TVDSS N/S EM Northing Easting DLeg TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (°) 3,618.55 6.06 99.33 3,618.10 3,528.55 -15.41 16.58 5,937,993.685 675,694.755 0.00 0.00 TIP 3,700.00 8.75 106.55 3,698.86 3,609.31 -17.87 26.77 5,937,991.460 675,704.995 3.49 22.66 i KOP - 9 5/8" 3,716.00 9.91 96.43 3,714.65 3,625.10 -18.37 29.30 5,937,991.018 675,707.541 12.50 -60.00 Start 20.00 hold at 3716.00 MD 3,736.00 9.91 96.43 3,734.35 3,644.80 -18.76 32.72 5,937,990.713 675,710.968 0.00 0.00 Start DLS 3.50 TFO -30.00 3,786.00 11.45 92.02 3,783.48 3,693.93 -19.41 41.96 5,937,990.272 675,720.215 3.50 -30.00 Start DLS 3.50 TFO -70.00 3,800.00 11.63 89.73 3,797.20 3,707.65 -19.45 44.76 5,937,990.294 675,723.016 3.50 -70.00 3,836.00 12.16 84.19 3,832.43 3,742.88 -19.05 52.16 5,937,990.867 675,730.406 3.50 -67.76 Start DLS 3.50 TFO -129.46 3,836.12 12.16 84.19 3,832.55 3,743.00 -19.05 52.19 5,937,990.871 675,730.432 0.00 0.00 SV1 3,900.00 10.88 74.99 3,895.14 3,805.59 -16.81 64.70 5,937,993.405 675,742.890 3.51 -129.46 4,000.00 9.58 56.56 3,993.58 3,904.03 -9.77 80.76 5,938,000.810 675,758.784 3.50 -120.45 1/12/2016 10:20:22AM Page 3 COMPASS 5000.1 Build 61 ++bp BP riFAa BP Well Plan Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: Plan 14-28B Design: 14-28B wp08b Planned Survey MD Inc (usft) (°) 4,100.00 9.47 4,200.00 10.57 4,300.00 12.58 4,400.00 15.13 4,456.93 16.73 UG4 (usft) 4,487.28 17.62 UG4A 4,092.23 4,500.00 18.00 4,600.00 21.05 4,643.76 22.43 UG3 16.10 4,700.00 24.22 4,791.53 27.19 Start 1583.89 hold at 4791.53 MD 4,800.00 27.19 4,900.00 27.19 5,000.00 27.19 5,100.00 27.19 5,200.00 27.19 5,300.00 27.19 5,329.91 27.19 UG1 60.57 5,400.00 27.19 5,500.00 27.19 5,600.00 27.19 5,700.00 27.19 5,800.00 27.19 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (°) 35.30 4,092.23 4,002.68 1.53 92.47 5,938,012.384 675,770.220 3.50 -102.30 16.10 4,190.73 4,101.18 17.06 99.77 5,938,028.083 675,777.157 3.50 -81.1 1.72 4,288.71 4,199.16 36.77 102.64 5,938,047.849 675,779.569 3.50 -62.42 351.66 4,385.81 4,296.26 60.57 101.07 5,938,071.608 675,777.447 3.50 -48.32 347.34 4,440.55 4,351.00 75.92 98.20 5,938,086.884 675,774.216 3.50 -38.55 345.36 4,469.55 4,380.00 84.63 96.08 5,938,095.540 675,771.894 3.50 -34.40 344.58 4,481.66 4,392.11 88.39 95.07 5,938,099.272 675,770.798 3.50 -32.50 339.45 4,575.91 4,486.36 120.11 84.65 5,938,130.737 675,759.648 3.50 -31.77 337.63 4,616.55 4,527.00 135.18 78.72 5,938,145.671 675,753.363 3.50 -26.931 335.58 4,668.20 4,578.65 155.61 69.87 5,938,165.886 675,744.037 3.50 -25.24 332.81 4,750.66 4,661.11 191.31 52.54 5,938,201.174 675,725.890 3.50 -23.36 332.81 4,758.20 4,668.65 194.76 50.77 5,938,204.576 675,724.041 0.00 0.00 332.81 4,847.15 4,757.60 235.40 29.89 5,938,244.718 675,702.218 0.00 0.( 332.81 4,936.10 4,846.55 276.04 9.01 5,938,284.860 675,680.396 0.00 0.00 332.81 5,025.05 4,935.50 316.69 -11.87 5,938,325.002 675,658.573 0.00 0.00 332.81 5,114.00 5,024.45 357.33 -32.76 5,938,365.144 675,636.751 0.00 0.00 332.81 5,202.95 5,113.40 397.97 -53.64 5,938,405.286 675,614.929 0.00 0.00 332.81 5,229.55 5,140.00 410.12 -59.88 5,938,417.291 675,608.402 0.00 0.00 332.81 5,291.90 5,202.35 438.61 -74.52 5,938,445.428 675,593.106 0.00 0.00 332.81 5,380.85 5,291.30 479.25 -95.40 5,938,485.570 675,571.284 0.00 0.00 332.81 5,469.80 5,380.25 519.90 -116.29 5,938,525.712 675,549.462 0.00 0.00 332.81 5,558.75 5,469.20 560.54 -137.17 5,938,565.854 675,527.639 0.00 0.00 332.81 5,647.70 5,558.15 601.18 -158.05 5,938,605.996 675,505.817 0.00 0.00 1 1/12/2016 10:20.22AM Page 4 COMPASS 5000.1 Build 61 BP ri.s �p BP Well Plan Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: Plan 14-28B Design: 14-28B wpO8b Planned Survey Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 MD Inc Azl (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (°) 5,900.00 27.19 332.81 5,736.65 5,647.10 641.82 -178.93 5,938,646.137 675,483.995 0.00 0.0n 5,971.84 27.19 332.81 5,800.55 5,711.00 671.02 -193.94 5,938,674.975 675,468.317 0.00 0.L WS2 6,000.00 27.19 332.81 5,825.60 5,736.05 682.46 -199.82 5,938,686.279 675,462.172 0.00 0.00 6,100.00 27.19 332.81 5,914.55 5,825.00 723.11 -220.70 5,938,726.421 675,440.350 0.00 0.00 6,200.00 27.19 332.81 6,003.50 5,913.95 763.75 -241.58 5,938,766.563 675,418.527 0.00 0.00 6,300.00 27.19 332.81 6,092.45 6,002.90 804.39 -262.46 5,938,806.705 675,396.705 0.00 0.00 6,338.34 27.19 332.81 6,126.55 6,037.00 819.97 -270.47 5,938,822.095 675,388.339 0.00 0.00 WS1 6,375.42 27.19 332.81 6,159.53 6,069.98 835.04 -278.21 5,938,836.979 675,380.247 0.00 0.00 Start DLS 3.50 TFO 168.47 6,400.00 26.35 333.19 6,181.48 6,091.93 844.91 -283.24 5,938,846.723 675,374.992 3.50 168.47 6,500.00 22.93 335.04 6,272.36 6,182.81 882.39 -301.47 5,938,883.765 675,355.891 3.50 168.13 6,518.62 22.30 335.44 6,289.55 6,200.00 888.89 -304.47 5,938,890.194 675,352.742 3.50 166.45 CM3 6,600.00 19.55 337.49 6,365.56 6,276.01 915.51 -316.10 5,938,916.539 675,340.494 3.50 166.08 6,700.00 16.21 340.91 6,460.72 6,371.17 944.16 -327.08 5,938,944.924 675,328.859 3.50 164.1 6,800.00 12.95 346.03 6,557.49 6,467.94 968.23 -334.35 5,938,968.813 675,321.030 3.50 160.90 6,900.00 9.85 354.38 6,655.52 6,565.97 987.62 -337.89 5,938,988.117 675,317.036 3.50 155.95 7,000.00 7.14 9.58 6,754.42 6,664.87 1,002.27 -337.69 5,939,002.764 675,316.892 3.50 147.76 7,090.67 5.50 34.68 6,844.55 6,755.00 1,011.40 -334.28 5,939,011.972 675,320.089 3.50 132.72 CM2 7,100.00 5.41 37.98 6,853.84 6,764.29 1,012.11 -333.76 5,939,012.699 675,320.597 3.50 107.77 7,200.00 5.66 74.81 6,953.41 6,863.86 1,017.13 -326.09 5,939,017.886 675,328.140 3.50 104.49 7,300.00 7.69 99.78 7,052.74 6,963.19 1,017.28 -314.74 5,939,018.305 675,339.490 3.50 67.81 7,400.00 10.53 112.96 7,151.48 7,061.93 1,012.58 -299.72 5,939,013.955 675,354.606 3.50 43.00 7,500.00 13.67 120.38 7,249.26 7,159.71 1,003.04 -281.12 5,939,004.851 675,373.432 3.50 29.99 7,600.00 16.95 125.02 7,345.70 7,256.15 988.69 -258.98 5,938,991.028 675,395.897 3.50 22.73 1/122016 10:20:22AM Page 5 COMPASS 5000.1 Build 61 by BP riha BP Well Plan Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28B plan @ 89.55usft (P273) Site: PB DS 14 MD Reference: 14-28B plan @ 89.55usft (P273) Well: 14-28 North Reference: True Wellbore: Plan 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B wp08b Database: EDM R5K - Alaska PROD - ANCP1 Planned Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (°) 7,700.00 20.30 128.18 7,440.45 7,350.90 969.60 -233.39 5,938,972.538 675,421.918 3.50 18.25 7,717.20 20.88 128.62 7,456.55 7,367.00 965.84 -228.65 5,938,968.891 675,426.745 3.50 15.: CM1 7,800.00 23.70 130.47 7,533.16 7,443.61 945.83 -204.46 5,938,949.448 675,451.397 3.50 14.84 7,900.00 27.12 132.21 7,623.47 7,533.92 917.47 -172.28 5,938,921.846 675,484.225 3.50 13.131 8,000.00 30.55 133.59 7,711.06 7,621.51 884.62 -136.98 5,938,889.835 675,520.278 3.50 11.56 8,100.00 34.00 134.71 7,795.60 7,706.05 847.42 -98.69 5,938,853.533 675,559.424 3.50 10.35 8,128.93 35.00 135.00 7,819.44 7,729.89 835.86 -87.07 5,938,842.249 675,571.305 3.50 9.40 Start 1050.00 hold at 8128.93 MD 8,164.47 35.00 135.00 7,848.55 7,759.00 821.45 -72.66 5,938,828.177 675,586.049 0.00 0.00 THRZ 8,200.00 35.00 135.00 7,877.66 7,788.11 807.03 -58.25 5,938,814.106 675,600.791 0.00 0.00 8,300.00 35.00 135.00 7,959.57 7,870.02 766.48 -17.69 5,938,774.507 675,642.280 0.00 0.00 8,356.13 35.00 135.00 8,005.55 7,916.00 743.71 5.08 5,938,752.280 675,665.567 0.00 0.00 BHRZ 8,400.00 35.00 135.00 8,041.49 7,951.94 725.92 22.87 5,938,734.907 675,683.769 0.00 0.00 8,400.08 35.00 135.00 8,041.55 7,952.00 725.89 22.90 5,938,734.877 675,683.801 0.00 0.17 TKNG 8,500.00 35.00 135.00 8,123.40 8,033.85 685.36 63.43 5,938,695.308 675,725.258 0.00 0.00 8,600.00 35.00 135.00 8,205.32 8,115.77 644.80 103.98 5,938,655.708 675,766.748 0.00 0.00 8,700.00 35.00 135.00 8,287.23 8,197.68 604.24 144.54 5,938,616.109 675,808.237 0.00 0.00 I 8,800.00 35.00 135.00 8,369.15 8,279.60 563.69 185.10 5,938,576.509 675,849.726 0.00 0.00 8,900.00 35.00 135.00 8,451.06 8,361.51 523.13 225.66 5,938,536.910 675,891.215 0.00 0.00 8,956.75 35.00 135.00 8,497.55 8,408.00 500.11 248.67 5,938,514.437 675,914.760 0.00 0.00 TJB 9,000.00 35.00 135.00 8,532.98 8,443.43 482.57 266.22 5,938,497.310 675,932.704 0.00 0.00 9,100.00 35.00 135.00 8,614.89 8,525.34 442.01 306.77 5,938,457.711 675,974.194 0.00 0.00 1/1212016 10:20:22AM Page 6 COMPASS 5000.1 Build 61 BP rel .s by BP Well Plan Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28B plan @ 89.55usft (P273) Site: PB DS 14 MD Reference: 14-28B plan @ 89.55usft (P273) Well: 14-28 North Reference: True Wellbore: Plan 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B wp08b Database: EDM R5K - Alaska PROD - ANCP1 Planned Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg TFace (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) V) 9,178.93 35.00 135.00 8,679.55 8,590.00 410.00 338.79 5,938,426.455 676,006.941 0.00 0.001 Start 20.00 hold at 9178.93 MD - TSGR 9,183.93 35.00 135.00 8,683.64 8,594.09 407.97 340.81 5,938,424.475 676,009.015 0.00 0.00 7" 9,198.93 35.00 135.00 8,695.93 8,606.38 401.89 346.90 5,938,418.535 676,015.239 0.00 0.00 Start DLS 6.00 TFO 0.00 9,200.00 35.06 135.00 8,696.81 8,607.26 401.45 347.33 5,938,418.111 676,015.683 6.00 0.001 9,209.49 35.63 135.00 8,704.55 8,615.00 397.57 351.22 5,938,414.320 676,019.655 6.00 0.001 TSHU 9,300.00 41.06 135.00 8,775.50 8,685.95 357.88 390.91 5,938,375.565 676,060.260 6.00 0.00 9,305.38 41.39 135.00 8,779.55 8,690.00 355.37 393.42 5,938,373.117 676,062.824 6.00 0.001 TSAD 9,306.71 41.47 135.00 8,780.55 8,691.00 354.75 394.04 5,938,372.508 676,063.462 6.00 0.00 Start DLS 12.50 TFO 7.15 9,400.00 53.05 136.80 8,843.76 8,754.21 305.56 441.56 5,938,324.446 676,112.113 12.50 7.15 9,500.00 65.50 138.21 8,894.75 8,805.20 242.26 499.46 5,938,262.513 676,171.470 12.50 5.92 9,600.00 77.95 139.36 8,926.05 8,836.50 170.95 561.88 5,938,192.684 676,235.527 12.50 52' 9,631.35 81.85 139.69 8,931.55 8,842.00 147.48 581.91 5,938,169.687 676,256.097 12.50 4.8.. 42N 9,700.00 90.40 140.40 8,936.18 8,846.63 95.02 625.85 5,938,118.269 676,301.247 12.50 4.77 9,800.00 102.86 141.45 8,924.65 8,835.10 18.07 688.35 5,938,042.798 676,365.514 12.50 4.73 9,849.29 109.00 142.00 8,911.13 8,821.58 -19.12 717.69 5,938,006.305 676,395.718 12.50 4.85 Start Turn 0.00 9,859.29 109.00 142.00 8,907.87 8,818.32 -26.57 723.52 5,937,998.992 676,401.711 0.00 0.00 Start DLS 12.50 TFO -96.45 9,900.00 108.35 136.67 8,894.83 8,805.28 -55.81 748.64 5,937,970.348 676,427.506 12.50 -96.45 10,000.00 106.16 123.78 8,865.06 8,775.51 -117.28 821.41 5,937,910.594 676,501.682 12.50 -98.16 10,100.00 103.21 111.22 8,839.62 8,750.07 -161.78 907.04 5,937,868.102 676,588.323 12.50 -101.99 1/122016 10:20:22AM Page 7 COMPASS 5000.1 Build 61 BP rias BP Well Plan Survey Report BAKER HUGHES by Well 14-28 Company: North America - ALASKA - BP Project: Prudhoe Bay (P273) Site: PB DS 14 Well: 14-28 14-28B plan @ 89.55usft Wellbore: Plan 14-28B Design: 14-28B wp08b North Reference: Planned Survey True MD Inc Azi (azimuth) (usft) C) 1') Method: 10,119.36 102.56 108.83 Start Turn 0.00 10,131.77 102.56 108.83 Start DLS 12.00 TFO -118.50 TVD 10,200.00 98.57 101.56 10,300.00 92.49 91.16 10,340.37 90.00 87.00 Start 400.00 hold at 10340.37 MD (usft) 10,400.00 90.00 87.00 10,500.00 90.00 87.00 10,600.00 90.00 87.00 10,700.00 90.00 87.00 10,740.37 90.00 87.00 Start DLS 12.00 TFO 179.43 5,937,858.414 676,617.748 10,800.00 82.85 87.07 10,900.00 70.85 87.20 10,963.60 63.21 87.29 Start Turn 0.00 8,810.43 8,720.88 11,000.00 63.21 87.29 11,100.00 63.21 87.29 11,160.57 63.21 87.29 TD at 11160.57 5,937,835.325 676,822.096 2,511.55 2,511.49 13 3/8" 3,700.00 3,698.86 9 5/8" 9,183.93 8,683.64 7" 11,160.57 8,949.55 4 1/2" BP rias BP Well Plan Survey Report BAKER HUGHES 1/122016 10:20:22AM Page 8 COMPASS 5000.1 Build 61 Local Co-ordinate Reference: Well 14-28 TVD Reference: 14-28B plan @ 89.55usft (P273) MD Reference: 14-28B plan @ 89.55usft (P273) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 TVD TVDSS N/S ENV Northing Easting DLeg TFace (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) V) 8,835.30 8,745.75 -168.24 924.77 5,937,862.056 676,606.194 12.50 -105.19 I 8,832.60 8,743.05 -172.15 936.23 5,937,858.414 676,617.748 0.00 0.00 8,820.08 8,730.53 -189.69 1,000.91 5,937,842.389 676,682.813 12.00 -118.50 8,810.43 8,720.88 -200.65 1,099.65 5,937,833.736 676,781.778 12.00 -119.83 8,809.55 8,720.00 -200.00 1,140.00 5,937,835.325 676,822.096 12.00 -120.84 8,809.55 8,720.00 -196.88 1,199.55 5,937,839.832 676,881.548 0.00 0.00 8,809.55 8,720.00 -191.65 1,299.41 5,937,847.390 676,981.256 0.00 0.001 8,809.55 8,720.00 -186.41 1,399.27 5,937,854.949 677,080.963 0.00 0.00 8,809.55 8,720.00 -181.18 1,499.13 5,937,862.507 677,180.671 0.00 0.00 8,809.55 8,720.00 -179.07 1,539.45 5,937,865.558 677,220.926 0.00 0.0011 8,813.27 8,723.72 -175.99 1,598.84 5,937,870.016 677,280.226 12.00 179.43 8,835.98 8,746.43 -171.13 1,695.92 5,937,877.136 677,377.157 12.00 179.42 8,860.79 8,771.24 -168.32 1,754.37 5,937,881.312 677,435.520 12.00 179.: 8,877.19 8,787.64 -166.78 1,786.82 5,937,883.604 677,467.929 0.00 0.00 8,922.26 8,832.71 -162.56 1,875.99 5,937,889.902 677,556.970 0.00 0.00 8,949.55 8,860.00 -160.00 1,930.00 5,937,893.716 677,610.898 0.00 0.00 13.375 17.500 9.625 12.250 7.000 8.500 - 4.500 6.125 1/122016 10:20:22AM Page 8 COMPASS 5000.1 Build 61 by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 14 Well: 14-28 Wellbore: Plan 14-28B Design: 14-28B wpO8b Formations Measured Vertical Depth Depth (usft) (usft) Name 9,209.49 8,704.55 TSHU 8,356.13 8,005.55 BHRZ 2,711.61 2,711.55 SV4 7,717.20 7,456.55 CM1 3,237.62 3,237.55 SV3 6,338.34 6,126.55 WS1 8,956.75 8,497.55 TJB 8,400.08 8,041.55 TKNG 4,643.76 4,616.55 UG3 3,427.62 3,427.55 SV2 6,518.62 6,289.55 CM3 4,487.28 4,469.55 UG4A 3,836.12 3,832.55 SV1 9,305.38 8,779.55 TSAD 5,329.91 5,229.55 UG1 4,456.93 4,440.55 UG4 9,631.35 8,931.55 42N 9,178.93 8,679.55 TSGR 5,971.84 5,800.55 WS2 8,164.47 7,848.55 THRZ 7,090.67 6,844.55 CM2 BP BP Well Plan Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Dip Dip Direction Lithology (I (�) Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 ri.a BAKER HUGHES 1/1212016 10:20:22AM Page 9 COMPASS 5000.1 Build 61 BP FSkv by BP Well Plan Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28B plan @ 89.55usft (P273) Site: PB DS 14 MD Reference: 14-28B plan @ 89.55usft (P273) Well: 14-28 North Reference: True Wellbore: Plan 14-28B Survey Calculation Method: Minimum Curvature Design: 14-28B wp08b Database: EDM R5K - Alaska PROD - ANCP1 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 3,618.55 3,618.10 -15.41 16.58 TIP 3,700.00 3,698.86 -17.87 26.77 KOP 3,716.00 3,714.65 -18.37 29.30 Start 20.00 hold at 3716.00 MD 3,736.00 3,734.35 -18.76 32.72 Start DLS 3.50 TFO -30.00 3,786.00 3,783.48 -19.41 41.96 Start DLS 3.50 TFO -70.00 3,836.00 3,832.43 -19.05 52.16 Start DLS 3.50 TFO -129.46 4,791.53 4,750.66 191.31 52.54 Start 1583.89 hold at 4791.53 MD 6,375.42 6,159.53 835.04 -278.21 Start DLS 3.50 TFO 168.47 8,128.93 7,819.44 835.86 -87.07 Start 1050.00 hold at 8128.93 MD 9,178.93 8,679.55 410.00 338.79 Start 20.00 hold at 9178.93 MD 9,198.93 8,695.93 401.89 346.90 Start DLS 6.00 TFO 0.00 9,306.71 8,780.55 354.75 394.04 Start DLS 12.50 TFO 7.15 9,849.29 8,911.13 -19.12 717.69 Start Turn 0.00 9,859.29 8,907.87 -26.57 723.52 Start DLS 12.50 TFO -96.45 10,119.36 8,835.30 -168.24 924.77 Start Turn 0.00 10,131.77 8,832.60 -172.15 936.23 Start DLS 12.00 TFO -118.50 10,340.37 8,809.55 -200.00 1,140.00 Start 400.00 hold at 10340.37 MD 10,740.37 8,809.55 -179.07 1,539.45 Start DLS 12.00 TFO 179.43 10,963.60 8,860.79 -168.32 1,754.37 Start Turn 0.00 11,160.57 8,949.55 -160.00 1,930.00 TD at 11160.57 1/122016 10:20:22AM Page 10 COMPASS 5000.1 Build 61 t-rolect: rrulanoetsay Site: PB DS 14 Well: 14.28 Wellbore: Plan 14-28B Plan: 14-288 wp08b (14-28/Plan 14-28B) WELL DETAILS: 14-28 Ground Level: 42.60 +N/ -S +FJ -W Northing Easling Latittude Longitude Slot 0.00 0.00 5938008.700 675677.820 70° 14'10.572 N 148'34'53,399W Ma(Fieac Nortic �\ • / -, CASINGDETAILS SECTION DETAILS Megletic swngh: i 14-28B Sec MD Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSect Target 1 3618.55 6.06 99.33 3618.10 -15.41 16.58 0.00 0.00 17.80 2 3700.00 8.75 106.55 3698.86 -17.87 26.77 3.49 22.66 28.15 3 3716.00 9.91 96.43 3714.65 -18.37 29.30 12.50 -60.00 30.72 4 3736.00 9.91 96.43 3734.35 -18.76 32.72 0.00 0.00 34.16 5 3786.00 11.45 92.02 3783.48 -19.41 41.96 3.50 -30.00 43.42 6 3836.00 12.16 84.19 3832.43 -19.05 52.16 3.50 -70.00 53.56 7 4791.53 27.19 332.81 4750.66 191.31 52.54 3.50 -129.46 36.56 B 6375.42 27.19 332.81 6159.53 835.04 -278.21 0.00 0.00 -346.25 9 8128.93 35.00 135.00 7819.44 835.86 -87.07 3.50 168.47 -155.83 10 9178.93 35.00 135.00 8679.55 410.00 338.79 0.00 0.00 303.76 11 9198.93 35.00 135.00 8695.93 401.89 346.90 0.00 0.00 312.51 12 9306.71 41.47 135.00 8780.55 354.75 394.04 6.00 0.00 363.38 13 9B49.29 109.00 142.00 8911.13 -19.12 717.69 12.50 7.15 716.82 14 9859.29 109.00 142.00 8907.87 -26.57 723.52 0.00 0.00 723.24 15 10119.36 102.56 108.83 BB35.30 -168.24 924.77 12.50 -96.45 935.50 16 10131.77 102.56 108.83 8832.60 -172.15 936.23 0.00 0.00 947.25 17 10340.37 90.00 87.00 8809.55 -200.00 1140.00 12.00 -118.50 1152.63 18 10740.37 90.00 87.00 8809.55 -179.07 1539.45 0.00 0.00 1548.98 19 10963.60 63.21 87.29 BB60.79 -168.32 1754.37 12.00 179.43 1762.28 20 11160.57 63.21 87.29 8949.55 -160.00 1930.00 0.00 0.00 1936.62 Ma(Fieac Nortic �\ • / -, CASINGDETAILS Megletic swngh: i 14-28B TVD MD Name Size Co-ordinate (WE) Reference: Well 14-28, True North Vertical(TVD)Reference: 14-28Bplan@B9.55usft(P273)�� VJ - 2511.49 2511.55 13 3/8" 13.375 Parent Wellbore: 14-28 Bund Dpth Reference: Slol-(000N,O.00E)89.5 Measured Depth Reference: 14288plan@89.55us8(P213) 3698.86 3700.00 95/8 9.625 ��� Moatl:BGG Tie on MD: 3618.55 8683.64 9183.93 7" 7.000 Calculation Method: Minimum Curvature O 400 140 120 100 0 � 600 0 00 �\ 8 CASINGDETAILS TVD MD Name Size r ' VJ - 2511.49 2511.55 13 3/8" 13.375 Start 3698.86 3700.00 95/8 9.625 Q O g 428 8683.64 9183.93 7" 7.000 O 400 8949.55 11160.57 41/2" 4.500 1 14-2 Btarg 2 + 2 KO - 1 � - urrt0 7O C ^ -2 target � � O -400 9 41/2" ' 1 -28B fl 3 _ _ -6 -800 _ I DOG 0 � 600 0 00 14 2813 flt 1 TIP r ' - - 7" Start Q g 428 72 3 1 14-2 Btarg 2 -- - KO - 1 � - urrt0 -SURVEY target � � St DLS .SOTF -70.0 9 41/2" ' 1 -28B fl 3 _ _ 95/8" _ - - 28Bt etarData + 14- 8Btareta SVl - 14-28 flt2 - ;"" ---p -- -- Star DLS350TF -129! 5 - -_ - a 2s1� -600 -400 -200 0 200 400 600 800 1000 1200 1400 1600 1800 2000 West( -)/East(+) (200 usft/in) ANNOTATIONS TVD MD Annotation 3618.10 3618.55 TIP 3698.86 3700.00 KOP 3714.65 3716.00 Start 20.00 hold at 3716.00 MD 3734.35 3736.00 Start DLS 3.50 TFO-30.00 3783.48 3786.00 StartDLS 3.50 TFO -70.00 3832.43 3836.00 Start DLS 3.50 TFO-129.46 4750.66 4791.53 Start 1583.89 hold at 4791.53 MD 6159.53 6375.42 Start DLS 3.50 TFO 168.47 7819.44 8126.93 Start 1050.00 told at 812x93 MD 8679.55 9178.93 Start 20.00 told at 917893 MD 8695.93 9198.93 Start DLS 6.00 TFO 0.00 8780.55 9306.71 Start DLS 1250 TFO 7.15 8911.13 9849.29 Start Tum 0.00 8907.87 9859.29 Start DLS 12.50 TFO-96.45 8835.30 10119.36 Start Tum 0.00 8&V 60 10,31.77 Start DLS 12.00 TFO -118.50 8809.55 10340.37 Start 400A0 hold at 10340.37 MD 8809.55 10740.37 Start OLS 12.00 TFO 179.43 8860.79 10963.60 Start Tum 0.00 8949.55 11160.57 TD at 11160.57 TIP r ' - - Start Q 72 3 -- - KO - - - - urrt0 -SURVEY St DLS .SOTF -70.0 ---- PROGRAM 28Bt etarData SVl - - - ;"" ---p -- -- Star DLS350TF -129! 5 - -_ - 2015-12167000000 V idated Y V78---- a es arson. _�Depth 0-- 4200 From Depth To Survey/Plant Tool .3618.55 1422SM2GYDGGCMS(1428)GYD-CT-CMS - '-'3618.55 - -- 3 UG4.-. ,. - -_- -... _ -. .4500 48 ---- - ---- ------ -- - -- `----- 3700.00 4100.00 14288wpO8b(PIan14288) INC+TREND 0 7��"' Opo - Start DLS 12.00 TF -118.5.- `-- --- 5600.00 14-28Bwp08b(Plan14-288) MWD - i 54 41/2" 4100.00 9184.00 14-28B wpO8b (Plan 14-28B) MWD44FR+MSWOCA - -- --*--- DL -G00 OTT. - ,-_.. '.. - t 9184.00 10130.00 1428BwpO8b(Plan 1428B) MWD l' -700 -600 -500 -400 -300 -200 00 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 23 9184.00 10130.00 14-28Bwp08b(Plan14-288) MWDNFR+MS-WOCA Vertical Section at 94.74° (100 usft/in) 10130.00 11160.00 W28BwpO8b(Plan 14288) MNO _ 10130.00 11160.57 14.28BwpO8b(Plan 1428B) MWDdFR+MS-WOCA - - _-. - tartD S 12.5 TFO7 1:5- __- ,_' - - --- - 9.0 o j„ 6000- WS2 6 ---- - - - - -- - -- CM3 650 -�-_ Start OLS 12.00 ITO 179.43 - - -- r\� - Y -- get. &nrtDS 12.5, TTD 645 _ _ -- 14-2 Btarg 4 of -- --- 000, r_ ._. ,J TVD MD Annotation 3618.10 3618.55 TIP 3698.86 3700.00 KOP 3714.65 3716.00 Start 20.00 hold at 3716.00 MD 3734.35 3736.00 Start DLS 3.50 TFO-30.00 3783.48 3786.00 StartDLS 3.50 TFO -70.00 3832.43 3836.00 Start DLS 3.50 TFO-129.46 4750.66 4791.53 Start 1583.89 hold at 4791.53 MD 6159.53 6375.42 Start DLS 3.50 TFO 168.47 7819.44 8126.93 Start 1050.00 told at 812x93 MD 8679.55 9178.93 Start 20.00 told at 917893 MD 8695.93 9198.93 Start DLS 6.00 TFO 0.00 8780.55 9306.71 Start DLS 1250 TFO 7.15 8911.13 9849.29 Start Tum 0.00 8907.87 9859.29 Start DLS 12.50 TFO-96.45 8835.30 10119.36 Start Tum 0.00 8&V 60 10,31.77 Start DLS 12.00 TFO -118.50 8809.55 10340.37 Start 400A0 hold at 10340.37 MD 8809.55 10740.37 Start OLS 12.00 TFO 179.43 8860.79 10963.60 Start Tum 0.00 8949.55 11160.57 TD at 11160.57 V4-2 Btarge 2 r ' Start Q 72 r urrt0 -SURVEY PROGRAM 28Bt etarData '`-�_- - -_ - 2015-12167000000 V idated Y V78---- a es arson. _�Depth 0-- From Depth To Survey/Plant Tool .3618.55 1422SM2GYDGGCMS(1428)GYD-CT-CMS - '-'3618.55 - -- o --, 3700.00 14288wp08h (Plan 14288) GYD-CT-CMS 3700.00 4100.00 14288wpO8b(PIan14288) INC+TREND 7��"' '-----',---'-`.""4100.00 `-- --- 5600.00 14-28Bwp08b(Plan14-288) MWD 41/2" 4100.00 9184.00 14-28B wpO8b (Plan 14-28B) MWD44FR+MSWOCA - -- --*--- 9184.00 10130.00 1428BwpO8b(Plan 1428B) MWD l' -700 -600 -500 -400 -300 -200 00 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 23 9184.00 10130.00 14-28Bwp08b(Plan14-288) MWDNFR+MS-WOCA Vertical Section at 94.74° (100 usft/in) 10130.00 11160.00 W28BwpO8b(Plan 14288) MNO _ 10130.00 11160.57 14.28BwpO8b(Plan 1428B) MWDdFR+MS-WOCA 11r--\ rwtect. rruwitleO y bp .Site: PB DS 14 � - -. - -- - NORTH AMERICA 1.l Interpolation Method MD interval: 25.00 Au`SKA Well: 14-28 Depth Range From. 3600 00 To 11160.57 P 9 Calculation McMoE M mCurvaWre Results Limped By: Centre Distance: 1311.36 Error System. ISCWSA Wellbore: Plan 14-28B Reference: Pian: 14-28Bw 08b 14-28/Plan 14-28B Swn M diad, Tray.0 10,njc P ( ) Enor Surtace. EII,CalConic Plan:14-28Bwp08b(14-281Plan14-28B) ,remiwMemm Rmaaeaaea +NIS +EI -W Northing 0.00 0.00 5938008.700 14-29/14-29/14-29 1 11 \ `BVI 24d\ 1� 14-10/14-10/' WELL DETAILS: 14-28 +N/ -S -15.41 Ground Level: 42.60 Oleg 0.00 Easting Latittude Longitude 675677.820 70° 14'10.572 N 148° 34'53.399 W Slot ,- 0 -L \- \x}505 - 19 51, 22.66 28.15 330, 170 4r48�\ 29.30 1250 150 \� 4 3736.009.91 96.43 3734.35 -18.76 32.72 0.00 0.00 34.16 9636 X60 19 I I , I -3®17 7 8 60 10 80 f V48h1 100 19 /�"120 / 120 7 � 7 140 From Colour To MD 0 3600 3600 3700 3700 4000 4000 4200 4200 4400 4400 4600 4600 4800 4800 5050 5050 10220 10220 10240 10240 10260 10260 10280 10280 11161 Run= BAKER HUGHES SECTION DETAILS Sec MD Inc Azi TVD 1 3618.55 6.06 99.33 3618.10 +N/ -S -15.41 +E/ -W 16.58 Oleg 0.00 TFace VSect Target 0.00 1780 2 370000 8.75 106.55 369866 -17.87 26.77 3.49 22.66 28.15 3 371600 9.91 96.43 3714.65 -18.37 29.30 1250 60.00 30.72 4 3736.009.91 96.43 3734.35 -18.76 32.72 0.00 0.00 34.16 5 3786.00 11.45 92.02 378348 -19.41 41.96 3.50 30.00 43.42 6 3836.00 12.16 84.19 3632.43 -19.05 52.16 3.50 -70.00 53.56 7 479153 27.19 332.81 4750.66 191.31 52.54 3.50 -12946 36.56 8 6375.42 27.19 332.81 6159.53 835.04 -278.21 0.00 0.00 -346.25 9 812893 35.00 135.00 7819.44 835.86 6707 3.50 168.47 -155.83 10 9178.93 35,00 135.00 8679.55 410.00 338.79 0.00 0.00 303.76 11 9198,93 35.00 135.00 969593 401.89 346.90 000 0.00 312.51 12 9306,71 41.47 135.00 8780.55 354.75 394D4 6.00 0.00 363.38 13 9849.29 109.00 142.00 8911.13 -19.12 717.69 12.50 715 716.82 149859.29 109.00 142.00 8907.87 -26.57 723.52 0.00 0.00 72324 15 10119.36 102.56 108.83 8835.30 -168.24 924.77 12.50 -96.45 935.50 16 1013177102.56 108.63 8832.60 -172.15 936.23 0.00 0.00 94725 17 10340.37 90.00 87.00 8809.55 -200.00 1140.00 12.00 -118.50 115263 1810740.37 90.00 87.00 810111 -111o7 1539.45 1,00 0.00 1548.98 19 1096360 63.21 8729 8860.79 -168.32 175437 12.00 179.43 1762.28 20 11160.57 6321 87.29 8949.55 -16000 193000 000 0.00 1936.62 40 300/l 25 \ 60 io 1-5 Z 10 ..;� L. - - - - .-� - �- - I j /� / j4 11 160 270�k �90 77 14-05/14-05/14-05 / � I X868 180 150� d i 100/Plan 14 -10A/14 -10A wp01 �V � � �V A �g039 14-08/14-08/14-08 - - 200 14-28/14-28A 14-28A/ 14 -08/14 -08A/14 -08A V _ 25_ 14-08/14-08APB1/ 14-08AP61 r 180 14-28/14-28/14-28 240. -x_396 120 Azimuth from North [°] vs Centre to Centre Separation [20 usft/in] SURVEY PROGRAM � �� 3 40 Date: 2016-01-11T00:00:00 Validated: Yes Version: 210\ \' 45 i 150 Depth From Depth To Survey/Plan Tool 50 _ _- '' - ,14 -28/14 -28A/14 -28A 118.55 3618.55 14-22 Srvy 2 GYD-GC-CMS (14-28)GYD-CT-CMS 3618.55 3700.00 14-28Bwp08b(PIan 14-28B) GYD-CT-CMS 180 - 3700.00 4100.00 14-288wpO8b(PI an14-28B)INC+TREND o 14- 14-2g��,q 8 4100.00 5600.00 14-288 wpO8b (Plan 14-28B) MWD Azimuth from North [o] vs Centre to Centre Separation usTUln1� 4100.00 9184.00 14-28B wpO8b(Plan 14-28B) MWD+IFR+MS-WOCA 9184.00 10130.00 14-288 wpO8b(Plan 14-28B) MWD 9184.00 10130.00 14-288 wpO8b (Plan 14-28B) MWD+IFR+MS-WOCA 10130.00 11160.00 14-28B wp08b(Plan 14-28 B) MWD 10130.00 11160.57 14-28B wpO8b(Plan 14-2813) MWD+IFR+MS-WOCA ao , I-- 14 aoAv, � d041<01 w saw w sae aaa w .aeA .a�Av, .a �.aaAvz aaa .sew. ve ,sasulve I .ae ,sa relv,'v aaa emwm, eaMaezv, .aa w aaaA mv, +mA saes w a a law +IOAwmw A w ' twtw a ,ew z z a a , 4 l w 5 a 4 eq env, 4d fi.PB IVI a d N1 w a ewe, ,ewe a w� ,ewe Q ewe< ,ew>a,w +Z1 Zit Dm ezw w - st; azv+gtw +zx ax=ax,+awazw ,dae, VID ;+awvamw +n,,anw I+m.,+mA uaww aao,,aaw„avaw uaa ,.ae,,saevl ,+mearam North America - ALASKA - BP Prudhoe Bay PB DS 14 14-28 Plan 14-28B 14-28B wp08b Anticollision Summary Report 11 January, 2016 FeAA P Was BAKER HUGHES BP by Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-28 Well Error: 0.00usft Reference Wellbore Plan 14-28B Reference Design: 14-28B wp08b Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum teference 14-28B wp08b 11ter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: 3,600.00 to 11,160.57usft Scan Method: Tray. Cylinder North tesults Limited by: Maximum center -center distance of 1,311.36usft Error Surface: Elliptical Conic Survey Tool Program Date 1/11/2016 From To (usft) (usft) Survey (Wellbore) 118.55 3,618.55 14-22 Srvy 2 GYD-GC-CMS (14-28) 3,618.55 3,700.00 14-28B wpO8b (Plan 14-28B) 3,700.00 4,100.00 14-28B wp08b (Plan 14-28B) 4,100.00 5,600.00 14-28B wp08b (Plan 14-28B) 4,100.00 9,184.00 14-28B wp08b (Plan 14-28B) 9,184.00 10,130.00 14-28B wp08b (Plan 14-28B) 9,184.00 10,130.00 14-28B wp08b (Plan 14-28B) 10,130.00 11,160.00 14-28B wp08b (Plan 14-28B) 10,130.00 11,160.57 14-28B wp08b (Plan 14-28B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 1/11/2016 12:55:18PM Page 2 of 5 COMPASS 5000.1 Build 61 Tool Name Description GYD-CT-CMS Gyrodata cont.casing m/s GYD-CT-CMS Gyrodata cont.casing m/s INC+TREND Inclinometer+ known azi trend MWD MWD - Standard MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD - Standard MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD - Standard MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 1/11/2016 12:55:18PM Page 2 of 5 COMPASS 5000.1 Build 61 b BP F, OVA �'! p Anticollision Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay ND Reference: 14-28B plan @ 89.55usft (P273) Reference Site: PB DS 14 MD Reference: 14-28B plan @ 89.55usft (P273) Site Error: 0.00usft North Reference: True Reference Well: 14-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 14-28B wp08b Offset ND Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 14 14-01 - 14-01 - 14-01 Out of range 14-01 - 14-01A- 14-01A Out of range 14-02 - 14-02 - 14-02 Out of range 14-02 - 14-02A - 14-02A Out of range 14-02- 14-02B - 14-02B Out of range 14-02 - 14-02C - 14-02C Out of range 14-02 - 14-02CL1 - 14-02CL1 Out of range 14-03- 14-03 - 14-03 Out of range 14-03 - 14-03A - 14-03A Out of range 14-04 - 14-04 - 14-04 Out of range 14-04 - 14-04A - 14-04A Out of range 14-05- 14-05 - 14-05 6,281.81 6,050.00 182.87 2.15 182.12 Pass - Minor 1/200 1 14-05 - 14-05A - 14-05A 6,281.81 6,050.00 182.87 2.15 182.12 Pass - Minor 1/200 J 14-06 - 14-06 - 14-06 3,600.00 3,650.00 644.17 61.13 583.04 Pass - Major Risk- isk14-06 14-06- 14-06A - 14-06A 3,600.00 3,650.00 644.17 61.13 583.04 Pass - Major Risk 14-07 - 14-07 - 14-07 4,686.21 4,575.00 491.90 429.79 65.81 Pass - Major Risk 14-08 - 14-08 - 14-08 4,003.14 4,125.00 117.07 110.39 28.89 Pass - Major Risk 14-08 - 14-08A - 14-08A 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-08 - 14-08ALl - 14-08AL1 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-08 - 14-08ALl PB1 - 14-08ALl PBI 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-08 - 14-08APB1 - 14-08APB1 4,004.91 4,125.00 117.90 110.82 28.85 Pass - Major Risk 14-08 - 14-08APB2 - 14-08APB2 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-09 - 14-09 - 14-09 3,604.77 3,900.00 818.58 132.22 733.59 Pass - Major Risk 14-09A - 14-09A - 14-09A 3,611.13 3,775.00 324.42 55.23 276.59 Pass - Major Risk 14-09A - 14-09ARD - 14-09ARD 3,611.13 3,775.00 324.42 55.23 276.59 Pass - Major Risk 14-09A - 14-09B - 14-09B 3,611.13 3,775.00 324.42 55.12 276.70 Pass - Major Ris 14-10 - 14-10 - 14-10 4,347.66 4,450.00 191.04 1.34 190.40 Pass - Minors 1/200 14-10 - Plan 14-10A- 14-10Awp01 4,706.68 4,750.00 120.37 1.13 119.60 Pass - Minor 1/200 14-11 - 14-11 - 14-11 5,953.18 5,800.00 722.35 2.14 721.60 Pass - Minor 1/200 14-11 - 14-11A- 14-11A 5,952.96 5,800.00 722.36 2.14 721.60 Pass - Minor 1/200 14-11 - 14-11AL1 - 14-11AL1 5,952.96 5,800.00 722.36 2.14 721.60 Pass - Minor 1/200 14-11 - 14-11APB1 - 14-11APB1 5,952.96 5,800.00 722.36 2.14 721.60 Pass - Minor 1/200 14-11 - 14-11 B - 14-11 B 5,952.96 5,800.00 722.36 2.14 721.60 Pass -Minor 1/2 0 14-12 - 14-12 - 14-12 5,387.30 5,175.00 569.37 366.11 208.36 Pass - Major Risk 14-13 - 14-13 - 14-13 4,206.75 4,050.00 1,074.33 158.22 925.90 Pass - Major Risk 14-14 - 14-14 - 14-14 3,609.96 3,750.00 1,164.73 115.97 1,053.69 Pass - Major Risk 14-15- 14-15 - 14-15 Out of range 14-16- 14-16 - 14-16 Out of range 14-16 - 14-16A - 14-16A Out of range 14-16 - 14-16APB1 - 14-16APB1 Out of range 14-18 - 14-18 - 14-18 5,792.11 5,400.00 874.58 147.69 767.31 Pass - Major Risk 14-18 - 14-18A- 14-18A 5,792.11 5,400.00 874.58 147.69 767.31 Pass - Major Risk 14-18 - 14-18APB1 - 14-18APB1 5,792.11 5,400.00 874.58 147.69 767.31 Pass - Major Risk 14-18 - 14-18APB2 - 14-18APB2 5,792.11 5,400.00 874.58 147.69 767.31 Pass - Major Risk 14-18 - 14-18APB3 - 14-18APB3 5,792.11 5,400.00 874.58 147.69 767.31 Pass - Major Risk 14-18 - 14-18APB4 - 14-18APB4 5,792.11 5,400.00 874.58 147.69 767.31 Pass - Major Risk 14-18 - 14-18B - 14-18B 3,608.45 3,700.00 1,205.06 62.81 1,142.46 Pass - Major Risk 14-18 - 14-18B - 14-18B WP13. 3,608.46 3,700.00 1,204.39 62.74 1,141.87 Pass - Major Risk 14-19 - 14-19 - 14-19 3,605.78 3,700.00 1,288.83 49.98 1,238.87 Pass - Major Risk 14-19 - 14-19PB1 - 14-19PB1 3,605.78 3,700.00 1,288.83 49.98 1,238.87 Pass - Major Risk 14-20 - 14-20 - 14-20 6,620.12 6,275.00 922.34 185.06 740.48 Pass - Major Risk 14-23 - 14-23 - 14-23 Out of range 14-23 - 14-23A- 14-23A Out of range 1/11/2016 12:55:18PM Page 3 of 5 COMPASS 5000.1 Build 61 �• BP Wel Fag ,1ti..r �P Anticollision Report BAKER HUGHES Company: NorthAmerica-ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-28 Well Error: 0.00usft Reference Wellbore Plan 14-28B Reference Design: 14-28B wp08b Summary Site Name Offset Well - Wellbore - Design PB DS 14 14-23 - 14-23APB1 - 14-23APB1 14-23 - 14-23APB2 - 14-23APB2 14-24 - 14-24 - 14-24 14-25 - 14-25 - 14-25 14-26 - 14-26 - 14-26 14-26 - 14-26A - WP02 14-27 - 14-27 - 14-27 14-28 - 14-28 - 14-28 14-28 - 14-28A - 14-28A 14-29 - 14-29 - 14-29 14-30 - 14-30 - 14-30 14-30 - 14-30A - 14-30A 14-33 - 14-33A - 14-33A 14-36 - 14-36 - 14-36 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) 6,390.26 5,900.00 1,078.78 4,467.12 4,450.00 499.41 4,467.12 4,450.00 499.41 3,616.48 3,650.00 441.76 3,965.42 3,950.00 27.19 3,965.42 3,950.00 27.19 3,613.73 3,600.00 101.01 3,605.93 3,650.00 320.60 3,605.13 3,650.00 320.27 4,192.51 4,150.00 417.45 1/11/2016 12:55;18PM Page 4 of 5 COMPASS 5000.1 Build 61 Out of range Out of range 137.01 976.02 Pass - Major Risk Out of range 230.64 294.60 Pass - Major Risk 230.48 294.76 Pass - Major Risk 49.75 394.58 Pass - Major Risk 55.52 -28.11 FAIL - Major Risk 55.52 -28.11 FAIL - Major Risk 10.31 90.87 Pass - Minor 1/51 52.15 270.68 Pass - Major Risk 52.03 270.47 Pass - Major Risk Out of range 131.54 304.33 Pass - Major Risk 1/11/2016 12:55;18PM Page 4 of 5 COMPASS 5000.1 Build 61 "tis BP FeAas by Anticollision Report BAKER HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-28 Well Error: 0.00usft Reference Wellbore Plan 14-28B Reference Design: 14-28B wp08b Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 14-28B plan @ 89.55usft (P273) Coordinates are relative to: 14-28 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0'0.000 W' Grid Convergence at Surface is: 1.33° 1 Ladder Plot n 14-02,14-02,144zgW 40P 14-09A, 14-09B6PP@9B V1 8 14-19,14-19,11WAP/12 12000 -�- 14-02,14-02A, 14 02AV4 1mdii (2000 usft/in) -- r; 14-19,14-19PB1,14-19PB1 V4 14 -02,14 -02C,14 -02C V28 $ 14-02,14-02CL1, 14-02CL1 VO 14-03,14-03,14-03V1 $ 14-03,14-03A,14-03AV1 14-04,14-04,14-04V3 14-04,14-04A,1404A V3 -rt}- 14-05,14-05,14-05V1 14-05,14-05A,14-05AV1 43- 14-06,14-06,14-06V4 - 14-06,14-06A 14-06A V2 14-11,14-11,14-11 V3 -- 14-23,14-23,14-23W 14-11,14-11A, 14-11 A V2 14 -23,14 -23A,14 -23A VO $ 14-11,14-11AL1,14-11AL1VO 14-23,14-23APB1,14-23APB1VO 14-11,14-11APB1,14-11APB1V5 - 14-23,14-23APB2,14-23APB2VO $ 14-11,14-11 B,14-11 B VO 14-24,14-24,14-24V1 43- 14-12,14-12,14-12V1 14-25,14-25,14-25 V1 14-13,14-13,14-13V1 14-26,14-26,14-26V10 $ 14-14,14-14,14-14\/2 $ 14-26,14-26A, WP02 VO 14-15,14-15,14-15V1 $ 14-27,14-27,14-27V1 14-16,14-16,14-16V1 $ 14-28,14-28,14-28V1 1/11/2016 12:55:18PM Page 5 of 5 COMPASS 5000.1 Build 61 NCO North America - ALASKA - BP Prudhoe Bay PB DS 14 14-28 Plan 14-28B 14-28B wp08b plus 500' MD Anticollision Summary Report 11 January, 2016 BAKER HUGHES b BP ri�� P BP Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-28 Well Error: 0.00usft Reference Wellbore Plan 14-28B Reference Design: 14-28B wp08b plus 500' MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 14-28B wp08b plus 500' MD Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 3,600.00 to 11,660.57usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic 1/11/2016 12:33:40PM Page 2 of 4 COMPASS 5000.1 Build 61 Survey Tool Program Date 1/11/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 118.55 3,618.55 14-22 Srvy 2 GYD-GC-CMS (14-28) GYD-CT-CMS Gyrodata cont.casing m/s 3,618.55 3,700.00 14-286 wp08b plus 500' MD (Plan 14-28B GYD-CT-CMS Gyrodata cont.casing m/s 3,700.00 4,100.00 14-28B wp08b plus 500' MD (Plan 14-28B INC+TREND Inclinometer+ known azi trend 4,100.00 5,600.00 14-28B wp08b plus 500' MD (Plan 14-28B MWD MWD - Standard 4,100.00 9,184.00 14-28B wp08b plus 500' MD (Plan 14-28B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 9,184.00 10,130.00 14-28B wp08b plus 500' MD (Plan 14-28B MWD MWD - Standard 9,184.00 10,130.00 14-28B wp08b plus 500' MD (Plan 14-28B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,130.00 11,160.00 14-28B wp08b plus 500' MD (Plan 14-28B MWD MWD - Standard 10,130.00 11,660.57 14-28B wp08b plus 500' MD (Plan 14-28B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 1/11/2016 12:33:40PM Page 2 of 4 COMPASS 5000.1 Build 61 ���'� BP year by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 14-28 Project: Prudhoe Bay TVD Reference: 14-28B plan @ 89.55usft (P273) Reference Site: PB DS 14 MD Reference: 14-28B plan @ 89.55usft (P273) Site Error: 0.00usft North Reference: True Reference Well: 14-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan 14-28B Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 14-28B wp08b plus 500' MD Offset TVD Reference: Offset Datum riga BAKER HUGHES Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 14 14-02- 14-02 - 14-02 Out of range 14-02 - 14-02A - 14-02A Out of range 14-02 - 14-02B - 14-02B Out of range 14-02 - 14-02C - 14-02C Out of range 14-02 - 14-02CL1 - 14-02CL1 Out of range 14-03 - 14-03 - 14-03 Out of range 14-03 - 14-03A - 14-03A Out of range 14-04 - 14-04 - 14-04 Out of range 14-04 - 14-04A - 14-04A Out of range 14-05 - 14-05 - 14-05 6,281.81 6,050.00 182.87 2.15 182.12 Pass - Minor 1/200 14-05 - 14-05A - 14-05A 6,281.81 6,050.00 182.87 2.15 182.12 Pass - Minor 1/200 14-06 - 14-06 - 14-06 Out of range 14-06 - 14-06A - 14-06A Out of range 14-07 - 14-07 - 14-07 Out of range 14-08 - 14-08 - 14-08 4,003.14 4,125.00 117.07 110.39 28.89 Pass - Major Risk 14-08 - 14-08A - 14-08A 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-08 - 14-08AL1 - 14-08AL1 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-08 - 14-08AL 1 P61 - 14-08AL1 PB1 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-08 - 14-08APB1 - 14-08APB1 4,004.91 4,125.00 117.90 110.82 28.85 Pass - Major Risk 14-08 - 14-08APB2 - 14-08APB2 4,004.91 4,125.00 117.90 110.67 29.01 Pass - Major Risk 14-09 - 14-09 - 14-09 Out of range 14-09A - 14-09A - 14-09A Out of range 14-09A - 14-09ARD - 14-09ARD Out of range 14-09A- 14-09B - 14-09B Out of range 14-10 - 14-10 - 14-10 4,347.66 4,450.00 191.04 1.34 190.40 Pass - Minor 1/200 14-10 - Plan 14-10A - 14-10A wp01 4,706.68 4,750.00 120.37 1.13 119.60 Pass - Minor 1/200 14-12 - 14-12 - 14-12 Out of range 14-13 - 14-13 - 14-13 Out of range 14-14 - 14-14 - 14-14 Out of range 14-15- 14-15 - 14-15 Out of range 14-26 - 14-26 - 14-26 Out of range 14-26 - 14-26A - WP02 Out of range 14-27- 14-27 - 14-27 Out of range 14-28 - 14-28 - 14-28 3,965.42 3,950.00 27.19 55.52 -28.11 FAIL - Major Risk 14-28 - 14-28A - 14-28A 3,965.42 3,950.00 27.19 55.52 -28.11 FAIL - Major Risk 14-28 - Plan 14-28B - 14-28B wp08b 6,800.00 6,800.00 0.00 194.09 -192.18 FAIL - Major Risk 14-29 - 14-29 - 14-29 3,613.70 3,600.00 101.01 10.31 90.87 Pass - Minor 1/50 14-30 - 14-30 - 14-30 Out of range 14-30 - 14-30A- 14-30A Out of range 1/1112016 12:33:40PM Page 3 of 4 COMPASS 5000.1 Build 61 BP FSR2 s by Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 14 Site Error: 0.00usft Reference Well: 14-28 Well Error: 0.00usft Reference Wellbore Plan 14-28B Reference Design: 14-28B wp08b plus 500' MD Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 14-28 14-28B plan @ 89.55usft (P273) 14-28B plan @ 89.55usft (P273) True Minimum Curvature 1.00 sigma EDM R5K -Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 14-28B plan @ 89.55usft (P273) Coordinates are relative to: 14-28 offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 ventral Meridian is 150° 0'0.000 W' Grid Convergence at Surface is: 1.33° Ladder Plot 0 2000 4000 6000 8000 10000 12000 MeaUcCrtjje_X1 2000 usft/in) rt 14 -02,14 -02A,14 -02A V4 14-02,14-026,14-026 V3 -X- 14 -02,14 -02C,14 -02C V28 14-02,14-02CL1,14-02CL1 VO —t— 14-03,14-03,14-03V1 —e- 14-03,14-03A,14-03AV1 14-04,14-04,14-04 V3 14 -04,14.04A,14 -04A V3 ^- 14-05,14-05,14-05 V 1 14-08,14-08A,14-08AV1 14-15,14-15,14-15 V1 14-08,14-08AL1,14-08AL1 V2 14-26,14-26,14-26 V10 $ 14-08,14-08AL1 PB1,14-08AL1 PB1 V1 14-26,14-26A, WP02 VO 14-08,14-08AP131,14-08APB1 V1 $ 14-27,14-27,14-27 V1 14-08,14-08APB2,14 08AP62 V1 $ 1428,14-28,14-28 V1 14-09,14-09,14-09\/3 $ 14 -28,14 -28A,14 -28A VO $ 14 -09A,14 -09A,14 -09A V1 1428, Plan 1428B,14 -28B wpO8b VO $ 14-09A,14-09ARD,14-09ARD V1 $ 1429,1429,14-29 V1 —t— 14-09A,1409B,14-09B V1 14-30,14-30,14-30\/9 $ 1410.1410.14-10 V1 14-30.14-30A 14-30A V5 1/11/2016 12:33:40PM Page 4 of 4 COMPASS 5000.1 Build 61 Site: PB DS 14 I Megne6e Fwm 14-288 Coordinate (WE) Reference, Well 14-28, True North Well: 14-28 Strength 5753 O.T Vertical (TVD) Reference: 14-28B plan @ 89.55usft (P273) Wellbore: Plan 14-28B Dipanpe.8101 Secbon (VS)Reference: Slot -(000N,O.00E) BAKER Date: 511201 Parent Wellbore: 14-28 Measured Depth Reference: 14-28B plan 89.55usfl P273 Plan: 1428Bwp08b plus500' MD (14 28/Plan 14 288) rnoda BGGM201 Tie on MD: 3618.55 p @ HUGNEi — Calculation Method: Minimum Curvature 0 594480C 594400C 594320C 594240C 594160C 594080C 594000C ^ 593920C C w 593840C 5937600 00O 593680C oA I = S 593600C Z 593520C 593440C 593360C 593280C 593200C 593120C 593040C 592960C 5928800 Easting (250 usft/in) m m m m CO m m m m m m Co m m m m m m Co m m m m CO m m m m m m m m m or, J J J J J J J J J J J J J J J J J J J J J J J J J m m m m m m m m m W A A A A m N N N m m m m J J J J m m m m t0 t0 t0 t0 O O O O N J O N m J O N Ur J O N Ut J O N m J O N m J O N Ut J O N N J O N N J O (Ji O N O N O N O N O m O Ut O Ut O Ur O m O m O m O N O ut O m O UI 00 o mO O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O D 14- 14-02/14-02 - - 2/14-028 - --+ 14-02/14-02 - — - - 03 14-03/14-03 14- 114=03A 14 04/14-04 14 04/14-04 i _ - -- - - - 4� 4- 1- -- 14 05/1 - _ 05 - - —� P - - an 4=10� 14-28/14-28 * 14-2 14.27 fi/ 4-0 -- 14 09A/14 -09B -- — ' 4-08 14 08/1 I4-08 PB2 j - - - - 14- 8/14-08A6 P -B j 14-08/14- 8AL _ t ( Cf - 4 08/1 1 c 4- PS m m m m m m m m m m - r - 4-02/14- - -- - -- - 2CL1 - — 14 13/1 13 — - - 1 7/14 — 1 0 14 4/14-14 4 14-02/ 4-02C _ - 14- 6/14 -- ��A. — _ — - -- - - - -- - T4p06/14-06 - _- 4-2 PI — - - 14-2 B - - -- 14-28/14 -28 - ---- OA 14- 0/14-310 - -14-331/14- - - __ 114-1 - Ll,408 m m /14-'0 14 OS 4-09A/14� 9A D - - , 14 -09A/14 -0 :.J I m m--0) - m - --- m m .m C; .M, m D m - m m m - 5944800 5944000 5943200 5942400 5941600 5940800 5940000 5939200 Z 5938400 CT 59376002 5936800 O 0 5936000 C C 5935200 5 5934400 5933600 5932800 5932000 5931200 5930400 5929600 5928800 m m m A N m m m m m J J J J m m 4 J O N N J O N m Jm 0 t0 Nm t0 -4 OO NO NO J-4 J NO O UO O Ul m N O m 0 Ul O O N 0 m O N O O O N n U1 OO O O O O O O O O O O O O O O O O O O O O O O O O 0 O 0 � O O O O O Easting (250 usft/in) -28B plan @ 89.55usft (13273) RAM TYPE BOP: SHAFFER LXT DOUBLE BOP 13 5/8"-5M 13 5/8"-5M STUDDED TOP 13 5/8"-5M FLANGED BOTTOM W/(2) 14" UL2 OPERATOR, UPPER CAVITY AND (2) 14" PSLK W/BSTR OPERATOR, LOWER CAVITY PARKER 273 BOP STACK 0 o o e� o , la/ o o oo e $ o o � o ° \/ 0 o a� CHOKE LINE: 3-1/8" 5M FLANGED MANUAL GATE VALVE _ 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 3-1/8" 5M FLEX HOSE DUTCH LOCK DOWN FLANGE ANNULAR BOP: SHAFFER LXT 13 5/8"-5M 13-5/8" 5M STUDDED TOP 13-5/8" 5M FLANGED BOTTOM DRILLING CROSS: 13 5/8"-5M FLANGED TOP 13 5/8"-5M FLANGED BOTTOM W (2) 3 1/8"-5M SIDE OUTLETS KILL LINE: 2-1/16" 5M FLEX HOSE 2-1/16" 5M X 3-1/8" 5M D.S.A. 3-1/8" 5M FLANGED MANUAL GATE VALVE 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE RAM TYPE BOP: SHAFFER LXT SINGLE 13 5/8" 5M 13 5/8"-5M STUDDED TOP 13 5/8"— 5M FLANGED BOTTOM W/(2) 14" UL2 OPERATOR BPXA EOA Well DS14-28 Post RWO Wellhead Ir 13-5/8 x 13-5/8 5000 Gray New Standarc Tubing Spool. 9-5/8 Secondary Pack-Ofl Seal in Bottom Profile. Tubing Hanger in Upper Bowl Gray Gen 2 Intermediate Casing Spool 21-1/4 2000 x 13-5/8 5000 13-3/8 Secondary Pack -Off Seal in Bottom 9-5/8 Mandrel with Primary Seal in Upper Bowl GRAY Gen 2 Casing Head -Welded or Screwed onto Casing 20" x 21-1/4 2000 13-3/8 Hanger with Primary Seal in Upper Bowl tandard Tubing Head Adapter (Bonnet) Bottom x 4-1/16 5000 Top "ee tandard Tubing Hanger for 4-1/2 Completion irel Pack -Off 2 to New Standard Conversion !al in the Gen2 Casing Spool — Secondary Vew Standard Tubing Spool :ondary Pack -Off Seal mary Seal Note. Dimensional information reflected on this drawing are estimated measurements only. 28.63 Est. I c 41/16" 5,000#-- �I 0 I 93.38" Est �_ 4-1/16" 5,000# 50" 75" Est.. i I 4-1/16" 5,000#— HIP Alas la SK -011583-03 CAMERON Jeanette 41-0:5 # J68163 Neme. Date. WorAmg Pressu re. Loepp, Victoria T (DOA) From: Smith, James <James.Smith7@bp.com> Sent: Monday, January 25, 2016 9:15 AM To: Loepp, Victoria T (DOA) Subject: RE: PBU 14-28B(PTD 216-014) Anti -collision Victoria, As it currently stands, these 3 wellbores fail BP's Major Risk criteria and will have to be Minor Risked by setting a tubing tail plug in each and shutting them in. The hope is that by running a gyro in each of these wells it will reduce the uncertainty and these wells will then pass the major risk criteria. This will allow us to not have to set the plug and shut these wells in. Please let me know if you have any further questions. Thanks, Jimmy Jimmy Smith Drilling Engineer— IPA Rotary BPXA James. smith7(a)bq.com Office: (907) 564-5616 Work Cell: (907) 887-9347 Personal: (770) 503-5886 From: Loepp, Victoria T (DOA)[ma i Ito: victoria. loepp@a laska.gov] Sent: Monday, January 25, 2016 8:49 AM To: Smith, James Subject: PBU 14-28B(PTD 216-014) Anti -collision Jimmy, In the anti -collision section the comment is made that a gyro will be run pre -rig in three wellbores in an attempt to clear up the anti -collision risk failure. Please explain. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeop(&alaska.gov TRANSMITTAL LETTER CHECKLIST WELL NAME: V . �� �6� PTD: /1-7/ Development Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL: 4/ 4 Check Box for Appropriate �eer / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT 14-28B_ Program DEV Well bore seg ❑ PTD#:2160140 Company BP EXPLORATION (ALASKA) INC. _ _ _ Initial Class/Type DEV/PEND _ GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 117 Nonconven. gas conforms to AS31.05.0300.1.A),0.2.A-D) NA 1 Permit fee attached NA NA 2 Lease number appropriate Yes Entire Well lies within ADL0028312. 3 Unique well name and number Yes 22 4 Well located in a defined pool Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F 5 Well located proper distance from drilling unit boundary Yes CO 341 F, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be 6 Well located proper distance from other wells Yes opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to CO 7 Sufficient acreage available in drilling unit Yes 341 F, Rule 2. - 8 If deviated, is wellbore plat included Yes 26 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes Yes 12 Permit can be issued without administrative approval Yes BOPEs, do they meet regulation SFD 1/21/2016 13 Can permit be approved before 15 -day wait Yes 30 14 Well located within area and strata authorized by Injection Order # (put_ 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA Yes 118 Conductor string provided NA Conductor set in PBU 14-28 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in PBU 14-28 Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date OTS C17KZ� Vz--IZS1� 20 CMT vol adequate to circulate on conductor & surf -csg NA Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will coverall known -productive horizons Yes Productive interval will be completed with cemented production liner and perforated 123 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved Yes PTD 211-105, Sundry 316-041 . 26 Adequate wellbore separation proposed Yes Anti -collision analysis complete; Major risk failures: 14-05, 14-10, 14-11; SI w/ TT plug; 14-29: SI 27 If diverter required, does it meet regulations_ NA Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure is 3342 psig(7.22 ppg EMW); will drill w/ 8.5-10.9 ppg EMW VTL 1/25/2016 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 2452 psig; will test BOPs to 3500 psig 31 Choke manifold complies w/API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No DS 14 wells are H2S-bearing. H2S measures are required. Geology 36 Data presented on potential overpressure zones Yes Planned mud weights appear adequate to control the operator's forecast of most likely pore pressures. Appr Date 37 Seismic analysis of shallow gas zones NA Should higher pore pressures be encountered, BP has immediate access to nearby fluid mixing facilities. SFD 1/21/2016 38 Seabed condition survey (if off -shore) NA 39 Contact name/phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date OTS C17KZ� Vz--IZS1�