Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-106
r STATE OF ALASKA RECEIVED AA OIL AND GAS CONSERVATION COMAION AUG 0 2 201 REPORT OF SUNDRY WELL OPERATIONS 2012 1. Operations Abandon U Repair Well U Plug Perforations U Perforate U Other 9 GC Performed: Alter Casing ❑ Pull Tubing ❑ Stimulate - Frac 0 Waiver ❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Stimulate - Other ❑ Re -enter Suspended Well ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development Q Exploratory ❑ " 197 -106 -0 3. Address: P.O. Box 196612 Stratigraphic ❑ Service ❑ 6. API Number: .. Anchorage, AK 99519 -6612 50- 029 - 20794 -60 -00 7. Property Designation (Lease Number): _ 8. Well Name and Number: ADL0028287 PBU A -26L1 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): — To Be Submitted PRUDHOE BAY FIELD / PRUDHOE BAY OIL POOL 11. Present Well Condition Summary: , Total Depth measured 11703 feet Plugs measured None feet true vertical 8749.07 feet Junk measured None feet Effective Depth measured 11618 feet Packer measured 10111 feet true vertical 8747.48 feet true vertical 8483.64 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 74 20" Conductor 36 - 110 36 - 110 0 0 Surface 2649 13 -3/8" 72# L -80 34 - 2683 34 - 2682.93 4930 2670 Intermediate None None None None None None Production 10381 9 -5/8" 47# L -80 32 - 10413 32 - 8731.02 6870 4760 Liner 272 7" 26# L -80 10148 - 10420 8513.69 - 8736.58 7240 5410 Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet SCANNED LIAR 0 4 2013. Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13Cr80 30 - 10195 30 - 8552.05 Packers and SSSV (type, measured and true vertical depth) 4 -1/2" TIW HBBP Pack 10111 8483.64 Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 481 174 524 1627 264 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory ❑ Development © - Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil — 1111 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Prepared by Garry Catron 564 -4424 Printed Name Nita Summerhays Title Petrotechnlcal Data Technician '' Signatur '+ r " I s Phone 564 -4035 Date 8/2/2012 y„ r.. ri��r, i / /rrr. _ ReDMS AUG 0 3 201. ` G �,... q ly. ti- , OA 014 41111/012 Form 10 -404 Revised 10/2010 Submit Original Only • • Daily Report of Well Operations ADL0028287 6/2/2012 ASRC Test Unit # 1 ** *Continue from WSR 6/1/12 * ** Inlet A -26, Outlet A -24 ** *Flow A -26 through test seperator down A- 24 * * *, R/D per PE, RDMO to Price Pad to Begin Maintenance 6/1/2012 ASRC Test Unit # 1 ** *Continue from WSR 5/31/12 ** *Safety Dril completed Inlet A -26, Outlet A -24 ** *Flow A -26 through test seperator down A -24 * ** 5131/2012 CTU #8 w/ 1.75" CT (CTV =34.0) Objective -clean out frac sand bridge and return well to production using ASRC Cont. C/O to 10501' CTD, hard tag, pump 2 x 20 bbl Geo sweeps off bottom. Circ out, POOH flowing to ASRC. At surface, well slugging /flowing thru ASRC to production facility. Close in dual swabs, pop off well while flowing thru ASRC to production facility. Well has bubbles coming from what appears to be around 13 3/8" in the cellar, called WI, informed Pad op. PJSM, RD. « »> 5/31/2012 ASRC Test Unit # 1 ** *Assist CTU * ** Inlet A -26, Outlet A -24 ** *Flow A -26 through test seperator down A -24 * ** 5/30/2012 CTU #8 w/ 1.75" CT (CTV =34.0) Objective -clean out frac sand bridge and return well to production using ASRC NU BOPE to well. MU 2.5" JSN BHA. WO Operations to finish LDF pigging operation. RIH w/ 2.5" JSN taking wellbore returns thru ASRC to A -24 FL. RIH tagged fill at 9479', washed down with GLG increased to 2.0 mmscf. C/O to TD, tagged TD @ 10501' CTD. « »> 5/30/2012 ASRC Test Unit # 1 ** *Assist CTU * ** Inlet A -26, Outlet A -24 ** *Flow A -26 through test seperator down A -24 * ** 5/29/2012 ASRC Test Unit # 1 ** *Assist CTU * ** Inlet A -26, Outlet A -24 5/29/2012 CTU #8 w/ 1.75" CT (CTV =34.0) Objective -clean out frac sand bridge and return well to production using ASRC MIRU from C -09. WO scaffolders to fin RU. Weekly BOPE test w/ no failures In progress 5/28/2012 ASRC Test Unit # 1. A -26 FCO /Frac. Flowback. * *Continue from WSR 05/27/12 ** RU, SB for CTU. Inlet A -26, Outlet A -24 * *Job In Progress Continue on WSR 05/29/12 ** 5/27/2012 ASRC Test Unit # 1. A -26 FCO /Frac Flowback. SB to fix electrical problem with genset, move to A -pad, RU, SB for WS to deleiver tanks. Inlet A -26, Outlet A -24. * *Job in Progress Continue on WSR 05/28/12 ** 2/17/2012 ** *WELL S/I ON ARRIVAL ** *(frac) DRIFT & S/D @ 9478' SLM W /2.55 "CENT & 1 -1/2" SAMPLE BAILER (recover sample of silt /hydrates) DRIFT & S/D @ 9468' SLM W/3.0" SAMPLE BAILER (recover sample of silt /hydrates) ** *WELL LEFT S /I, PAD OP NOTIFIED * ** 2/10/2012 ASRC Test Unit #2 Continue WSR from 2 -7 -12 RU,PT, Well Test, Inlet A -26, Outlet A -24. intial TIO 0,460,0, Rig down complete. Tree cap PT complete. Standby for equip. to pick berm and Unit move. * *Continue on to WSR 2- 11 -12 ** 2/9/2012 T /I /O= SSV /0 /0 Freeze protect flowline for well #24 (Post Well Testers, Fracturing) Pumped 2 bbls neat meth, 33 bbls crude, 5 bbls neat meth, 50 bbls crude and 3 bbls neat meth down the Flowline of well A -24 according to WOA recipe to freeze protect for ASRC Well Test Unit. Tags hung. SV, WV, SSV & AL =SI. MV, IA & OA open. FWP's = SSV /0/0. 2/9/2012 ASRC Test Unit #2 Continue WSR from 2 -7 -12 RU,PT, Well Test, Inlet A -26, Outlet A -24. intial TIO 0,460,0, Rig down • • 2/8/2012 ASRC Test Unit #2 Continue WSR from 2 -7 -12 RU,PT, Well Test, Inlet A -26, Outlet A -24. intial TIO 0,460,0, weekly Drills completed 2/8/2012 T /I /0 = 190/1130/0. Temp = SI. WHPs IA FL. AL online @ 1160 psi. IA FL @ 8400' (1554' above SO, 449 bbl). ASRC test unit in control of well. 04:30 2/7/2012 ASRC Test Unit #2 inlet A -26, Outlet A -24, STBY, Flow Well, Well Test,continue WSR 2/7, Drills Completed 2/6/2012 ASRC Test Unit #2. A -26 Frac. Flowback. * *Continue from WSR 02/05/12 ** Rig Up, PT, Discovered ice plug in outline flow line. SB for Pump Crew to thaw plug. Inlet A -26, Outlet A -24* *Job in Progress continue on WSR on 2- 7 -12 ** 2/5/2012 ASRC Test Unit #. A -26 Frac. Flowback. Rig Up and PT. Inlet A -26, Outlet A -24 * *Job In Progress continued on WSR 02/06/12 ** 2/3/2012 ** *WSR CONTINUED FROM 2/2/2012 * ** (Frac) SET 1 1/2" RM -OGLV (20/64TH PORTS) IN STA# 1 @9,941' SLM/ 9,954' MD. PULLED 4 1/2" XCATCHER @ 10,142' SLM/ 10,162' MD. (empty) * * * *SSV LEFT DUMPED, LEFT WELL SHUT -IN ON DEPARTURE * * ** 2/2/2012 ** *CONT FROM 2/1/12 WSR * ** PULLED 1 1/2" RM -DGLV FROM STA# 1 @9,941' SLM/ 9,954' MD. SET 1 1/2" RM -LGLV (1,778 PSI, 16/64" PORTS) IN STA# 6 @3,047'SLM/ 3,069' MD. SET 1 1/2" RM -LGLV (1,748 PSI, 16/64" PORTS) IN STA# 4 @6,560' SLM/ 6,580' MD. * ** *JOB STILL IN PROGRESS, WSR CONTINUED ON 2/3/2012 * * ** 1/30/2012 ** *WSR CONTINUED FROM 1/29/2012 * ** (Frac) SET4 1/2" X- CATCHER SUB @10,142' SLM/ 10,162' MD. PULL 1 1/2" DGLV FROM STA #4 @ 6,547' SLM/ 6,580' MD. * ** *LAY SLICKLINE UNIT DOWN DUE TO LOW TEMPS. GO ON WEATHER TICKET * * ** NOTE: 4 -1/2" OTIS X -LOCK CATCHER SUB SET 10,162' MD. GLM #4 AT 6580' MD IS EMPTY (VALVE PULLED). 1/29/2012 ** *WELL WAS SHUT -IN ON ARRIVAL * ** (Frac) RIG UP SLICKLKINE UNIT. * ** *JOB STILL IN PROGRESS, WSR CONTINUED ON 1/30/2012 * * ** 1/21/2012 Continued from WSR 01 -20 -12 CTU #8 w/ 1.75" CT (CTV =33.8) Objective: Post frac sand cleanout Continue reverse out from 9300' to 10100' and losses became excessive. Jet from 10100' w/ KCI w/ PowerVis sweeps and stop @ 10450' (approx 30' below window) due to 35 -40% losses. Pump final sweep and chase OOH @ 80% w/ KCI. FP wellbore w/ 60/40 from 3000'. RDMO to 04 -350 * *job complete ** (Held well control drill; pinhole in coil with no checks) 1/20/2012 CTU #8 w/ 1.75" CT Objective: Post frac sand cleanout Move from SWS yard after performing maintenance. Rig up/ function test BOP's . RIH to 3000', clean. Reverse FCO wellbore from 3000 -9300' w/ KCI and found sand top at 9088'. * *job continued on WSR 01-21-12** 12/19/2011 ** *JOB CONTINUED FROM 12/18/11 * ** DRIFT TO 3900' SLM W/ 2.50" CENT & SMPL BLR, UNABLE TO MAKE HOLE DUE TO THICK FLUID. ** *WELL LEFT SHUT IN, PAD -OP NOTIFIED OF STATUS * * ** 12/18/2011 ** *WELL SHUT IN ON ARRIVAL * ** RIG UP SLICKLINE AND PT PCE. ** *JOB CONTINUED ON 12/19/11 * ** • • 12/16/2011 ** *SLB Frac * ** Job Scope: Fracture Sag «» Continued from 15 Dec 11. Spot in frac equipment. Pump 2 data fracs. Could not get a good analysis on data frac due to possible influences of lateral on leak off and net pressure. Datafrac analysis showed frac gradient = 0.55, ISIP = 981 psi, Pc = 981 psi, Tc = 0 min, eff = 0. Design parameters for frac were based on previous Sag fracs. Pump frac at 20 bpm using 40# XL gel: Pad stage of 400 Bbls, 1 PPA Flat stage, ramp 1 PPA - 4 PPA in 150 bbls, ramp 4 PPA - 8 PPA in 225 bbls. Call flush j at 218 bbls into flat 8 PPA stage. Flush volumes of 43 Bbls linear gel, and 59 bbls mineral I � oil. Seven Bbls of mineral oil in surface lines, and 51 Bbls in the well, placing freeze protect at 3420'. Pnet for frac = 1950 psi. Pumped at total of 116,426 lbs of 70/40 Carbolite propant, of which 100,713 lbs were placed behind pipe and 15,716 lbs in liner. Propant top at - 9280'. ** *Job Complete * ** 12/16/2011 ** *Job continued from 12 -15 -11 WSR * ** T /I /0= 150/0/10 LRS Assisted SLB with a Frac. Heat frac tanks and Mineral Oil to 100* F. Pumped 13.1 bbls DSL down the IA to maintain 3500 psi while SLB performed a Frac. Bled IAP (7.2 bbls). Tags hung, IA valve left open. F W P's= 500/ 1000/ 10. 12/15/2011 ** *Continued from 12 -14 -11 WSR * ** LRS assist SLB with Frac, job postponed till 12 -16- 11. Heated frac tanks to 100 *F ** *Continued on 12 -16 -11 WSR * ** 12/14/2011 Assist SLB with Frac. Job postponed (see Log tab). LRS heat mineral oil transport. ** *Job continued on 12 -15 -11 WSR * ** 12/14/2011 ** *SLB Frac * ** Job Scope: Fracture Sag «» Rig up remaining frac equipment. Multiple attempts to obtain a passing pressure test on surface equipment were unsuccessful. Job postponed to next day. ** *Job Not Complete * ** 12/13/2011 Assist SLB with frac. Heat mineral oil to 120 *F. 12/12/2011 Heated 5 frac tanks to 100 *F. Heated Mineral Oil transport to 95 *F. 12/11/2011 LRS standby for Snow Removal to Roll & Heat Frac Tanks. ** *WSR continued on 12/12/11 * ** 9/11/2011 T /I /0= 1825/360/0 Temp =Sl Injectivity Test (Pre- Fracturing) Pumped 5 bbls neat meth & 175 bbls crude to load Tbg. Injectivity test: 180 psi @ .5 bpm, 185 psi @ 1 bpm, 210 psi @ 1.5 bpm, 255 psi @ 2 bpm, 300 psi @ 2.5 bpm, 350 psi @ 3 bpm, 410 psi & 3.5 bpm, 455 psi @ 4 bpm, 530 psi @ 4.5 bpm, 600 psi @ 5 bpm. FWP= 180/300/0. Tag hung. SV, WV & SSV =S /I, MV =Open, IA & OA =OTG. 9/8/2011 ** *WELL S/I ON ARRIVAL ** *(pre frac) RUN 2.50 CEN, TEL, 1.50 SAMPLE BAILER, LOC TT @ 10177' SLM 10191' ELMD +14' COR, TAG BOTTOM @ 10493' SLM 10,507'ELM, SAMPLE OF CEMENT SLOTTED LINER OPEN, 87' OF RAT HOLE F /BTM OF MILL OUT WINDOW ** *WELL LEFT S/I ON DEPARTURE PAD OPP NOTIFIED * ** 8/20/2011 ** *CONT FROM 08/19/11 WSR ** *(pre frac) MADE FINAL RUN W/ 10' x 3" DUMP BAILER, DUMPED TOTAL OF 17 gals OF CEMENT FOR JOB BEGINNING DEPTH WAS 10,504' SLM, FINAL DEPTH IS 10,496' SLM ** *WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED * ** 8/19/2011 T /I /0= 1550/1500/0 Temp =SI Assist Slickline, MIT -IA PASSED to 4000 psi (Fracturing) Loaded IA with 5 bbls meth spear followed by 645 bbls of 90* crude. SSL to set DGLV. Pressured up IA with 11 bbls crude to reach 4000 psi. MIT -IA lost 100 psi in 1st 15 minutes and 40 psi in 2nd 15 minutes for a total of 140 psi in a 30 minute test. Bled IAP. Slickline on well upon departure. FWHP's= 1850/400/20. 8/18/2011 T /I /0= 1830/1520/0+ Temp= S/I Assist Slickline /Brush & Flush ( Pre Frac ) Speared into TBG w/ 3 bbls neat methanol followed by 90 bbls 180* DSL while slickline RIH w/ gauge ring & braided line brush. FWHP= 1080/1540/0. Slickline still on well upon LRS departure. IA & OA OTG. • • FLUIDS PUMPED BBLS 111 DIESEL 23 METH 1029 CRUDE 2039 WATER 635 MINERAL OIL 518 20# LIN GEL 1318 40# XL GEL 1295 1% KCL 80 POWERVIS 98 60/40 METH 11 50/50 METH 7157 TOTAL GALS 17 CEMENT 17 TOTAL • • Perforation Attachment ADL0028287 Ope ratio n Meas Meas SW Operation Cod Depth Depth TVD Depth TVD Depth Name Date e Top Base Top Base A -26L1 7/5/97 OH 10420 10424 8736.58 8739.66 A -26L1 7/5/97 SL 11048 11652 8654.22 8660.53 AB ABANDONED MIR REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP PULLED MLK MECHANICAL LEAK BRIDGE OPEN BPS PLUG SET OH HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF TREE= , . _ Q Vva.LHEAD = 41McEV0 ` � 70° @ 10500'. TOP OF 2-718" "LLNR DEPL""OY45 V ANGLE> ACTUATOR = BAKER C L 1 RE LEASED 10424' (3' OUTSIDE OF WINDOW). WS KB. ELEV = 87.69' DROPPED DURING RECOVERY- SITTING ON TOP OF SAND BF. ELEV = 51.89' PLUG. KOP = 3100' Max Angie = 96° it 10663 ( 2074' H4-1/2 " CAMCO SSSV LAND NIP, ID = 3.81" I _Datum MD = , Datum TVD = 8800' SS = =i--d 2598' — 19 -5/8" DV PKR GAS LIFT MANDRELS 13 -3/8" CSG, 72#, L-80, ID = 12.347" ---1 2683' ST MD TVD DEV TYPE VLV LATCH FORT DATE 6 3069 3067 ' 10 OTIS DONE RM 16 02/03/12 Minimum ID = 3.80" @ 10183' L 5 5067 4651 ' 45 OTIS DMY RM 0 02/15/10 4-1/2" MILLED PKR S W N NIP 4 6580 5735 ' 40 OTIS DOME RM 16 02/03/12 3 8046 6869 r 45 OTIS DM' RM 0 02/15/10 2 9811 8245 ' 39 OTIS DMY RA 0 09/05/91 SAFETY NOTES: WARNING: RADIO TRANSMITTER IN 1 9954 8358 ' 37 OTIS SO RM 20 02/03/12 WEATHER MONITORING SHACK M UST BE TURNED OFF BEFORE ANY WELL WORK INVOLVING ' 10099' — 14 -1/2" PKR SWS NIP, 10 = 3.813" EXPLOSIVES CAN BEGIN. CONTACT PAD OPERATOR I 10110' HTBG ANCHOR LATCH, ID = 3.93" 1 �� 10111' 9 " X 4-1/2" TM/ HBBP PKR, ID = 4.0" 10116' I-- 4" MILLOUT EXTENSION, ID = 4.87" 19-5/8" X 7" BOT LNR HGR Wt TIEBACK SLV H 10148' 10120' --15 -112" X 4-1/2" XO, ID = 3.958" { 10162' H4-1/2" PKR SWS NIP, ID = 3.813" 1 4-1/2" TBG, 12.6 #, 13 -CR, .0152 bpf, ID= 3.958" IH 10195' , 10183' I— 4-1/7' PKR SWN NIP, (MILLED 06/97), ID = 3.80" 9-5/8" CSG, 47 #, L -80, ID = 8.681" —1 10413' N 10195' H4- 1 /2 "WLEG,ID= 3.958" PERFORATION SUMMARY REF LOG: CBUGR ON 09 /13/82 10191' — ELMO TT LOGGED XX/XX/XX 1 ANGLE AT TOP PERF 36° @ 10413 Note: Refer to FYoduction DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 3-3/8" 6 10413 - 10439 C 01/31/96 1 , 7" MILLOUT WINDOW (A -26L1) 10410'- 10420' I 3-3/8" 6 10520 - 10560 C 06/02/97 / 3-3/8" 4 10520 - 10570 C 06/02/97 2-7/8" 4 10574 - 10641 C 06/02/97 10424' -- 13.75" BKR DEPLOY GS SLV, ID = 3.00" 1 2 -7/8" 4 10651 - 10676 C 06/02/97 2 -7/8" SLTD 11048 - 11619 SLOT 06/27/97 i ,. -1 10429' — 13 -1/2" X 2 -7/8" XO, ID = 2.37" ITOPOFCEMENT(08 /19/11) H 10496' ffiii_mI ■ SLUGGITS (12/22/09) --1 ? 13 -3/8" BKR IBP (TAGGED 8/19/11) — 10526' Al 'FISH - IBP ELEMENTS (11/20/09) IH ? M , FISH: RE I REIVABLE WHIPSTOCK — 10519' i N ( 11618 —1 PBTD N. N. \ RELEASED (TAGGED 10/02/09) 2 -7/8" SOLID LNR, —1 11048' ` N. TOP OF SAND/ CMT (TAGGED 12/17/07) —1 10523' 6.04#, L -80 STL, ■ `` ■ ■ .058 bpf, ID = 2.441" � j � . � j � . t• 4.41 2 -7/8" SLTD LNR, 6.04#, L -80 STL, — 11652 +��yp 1 7" LNR, • 26#, L -80, 0383 bpf, ID = 6.276" —1 11338' I ky'v- v � � �v v v - D58 bpf, ID = 2.441" �q DATE REV BY COMMENTS J DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/14/82 ORIGINAL COMPLETION 02/27 /10 DAV /PJC GLV CIO (02/15/10) WELL: A-26L1 09/07/97 D16 RWO 12/16/10 CSR/PJC LNR / NAME/ PTO CORRECTIONS PERMIT No: 1821170 / 1971060 07105/97 CTD CTD SIDETRACK (A -26L1) 08/22/11 WEC/ PJC DUMP CMT (08/20/11) API No: 50- 029 - 20794 -00 / (60) 11/21/09 GJFISV FISH - IBP ELEMENTS (11 /20/Of. 01/02/12 PJC DRAWING CORRECTIONS SEC 35, T11 N, R 13E 2541' FNL & 1703' FEL 12/09/09 MBMISV SET IBP(12/08/09) 02/08/12 GJB/JMD GLV C/O (02/03/12) 01/01/10 BSE/RPC DUMPED SLUGGITS(12/22/09) BP Exploration (Alaska) • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 Mr. Jim Regg ED AUG 1 7 2012 Alaska Oil and Gas Conservation Commission 333 West 7 Avenue (.( \ I ° 1_ , , Anchorage, Anchorage, Alaska 99501 , Subject: Corrosion Inhibitor Treatments of GPB A -Pad or- Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad A that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, L- Mehreen Vazir BPXA, Well Integrity Coordinator • 1 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) A -Pad Date: 04/15/2012 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls it na gal A -01A 2012420 50029201080100 1.3 NA 1.3 NA 11.10 7/21/2009 A -02 1710310 50029201090000 1.9 NA 1.9 NA 13.60 7/22/2009 A -03 1710380 50029201130000 0.5 NA 0.5 NA 5.10 7/21/2009 A -04 1720060 50029201150000 0.0 NA NA NA NA NA A -05A 2061280 50029201160100 0.0 NA NA NA NA NA A -06 1720180 50029201180000 0.8 NA 0.8 NA 6.80 7/21/2009 A -07 1730410 50029201310000 0.8 NA 0.8 NA 5.10 8/12/2009 A -08 1740040 50029201320000 No conductor NA NA NA NA NA A -09A 2001740 50029205520100 0.5 NA 0.5 NA 3.40 7/21/2009 A -10 1810300 50029205680000 14.0 NA 14.0 NA 103.70 7/22/2009 A -11 1810380 50029205750000 5.0 NA 5.0 NA 17.00 7/22/2009 A -12A 2071300 50029205150200 0.5 NA 0.5 NA 3.40 7/22/2009 A -13 1811590 50029206720000 0.3 NA 0.3 NA 2.55 4/15/2012 A -14 1810770 50029206050000 3.3 NA 3.3 NA 17.00 7/19/2009 A -15 1810780 50029206060000 0.5 NA 0.5 NA 3.40 7/19/2009 A -16A 1960980 50029205210100 0.3 NA 0.3 NA 1.70 7/19/2009 A -17A 2061250 50029205200100 0.3 NA 0.3 NA 2.60 7/19/2009 A -18 1921070 50029206300100 SC leak NA NA NA NA NA A -19 1811270 50029206480000 0.8 NA 0.8 NA 3.40 7/19/2009 A -20 1820130 50029207090000 0.8 NA 0.8 NA 5.10 7/20/2009 A -21 1820140 50029207100000 2.0 NA 2.0 NA 16.15 7/20/2009 A -22 1820180 50029207120000 Sealed conductor NA NA NA N/A NA A -23 1820240 50029207160000 0.3 NA 0.3 NA 3.40 7/20/2009 A -24 1820700 50029207430000 29.0 5.8 0.1 11/27/2009 1.70 3/18/2010 A -25A 2011480 50029207640100 0.3 NA 0.3 NA 1.70 8/13/2009 ---1 A -26L1 1971060 50029207946000 0.3 NA 0.3 NA 1.70 7/21/2009 A -27A 1982350 50029208090100 7.5 NA 7.5 NA 71.40 7/20/2009 A -28 1821500 50029208250000 2.5 NA 2.5 NA 20.40 7/20/2009 A -29 1821670 50029208410000 9.0 NA 9.0 NA 62.90 7/21/2009 A -30A 2040780 50029213720100 0.3 NA 0.3 NA 1.70 7/19/2009 A -31A 1990560 50029213830100 0.8 NA 0.8 NA 4.30 7/19/2009 A -32A 1990580 50029213950100 2.0 NA 2.0 NA 17.00 4/11/2012 A -33 1851830 50029214100000 0.8 NA 0.8 NA 3.40 8/12/2009 A -34A 1851050 50029213390100 4.4 NA 4.4 NA 28.90 7/22/2009 A -35 1850510 50029213130000 1.3 NA 1.3 NA 10.20 7/22/2009 A -37 1930070 50029223310000 0.0 NA NA NA N/A No treat A -38 1930320 500292234700 0.1 NA 0.1 NA 0.85 4/15/2012 A -39 1930280 50029223440000 0.5 NA 0.5 NA 3.40 7/21/2009 A -40 1930140 50029223370000 0.5 NA 0.5 NA 3.40 7/22/2009 A -41 1941580 50029225300000 SC leak NA NA NA NA NA A -42A 2061300 50029225420100 0.6 NA 0.6 NA 5.10 7/20/2009 A -43 1960860 50029226770000 0.3 NA 0.3 NA 1.70 8/12/2009 A -44 2090410 50029234120000 1.5 NA 1.5 NA 8.50 6/24/2009 STATE OF ALASKA ALASKA. AND GAS CONSERVATION COMMISSI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate 0 f Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waived] Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ID Exploratory ❑ ,, 197 -1060 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 .. 50- 029 - 20794 -60 -00 8. Property Designation (Lease Number) : w 9. Well Name and Number: ADLO- 028287 PBU A -26L1 10. Field /Pool(s): s PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 11703 feet Plugs (measured) None feet true vertical 8749.07 feet Junk (measured) None feet Effective Depth measured 11618 feet Packer (measured) 10111 feet true vertical 8747.48 feet (true vertical) 8484 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 36 - 146 36 - 146 Surface 2648' 13 -3/8" 72# L -80 35 - 2683 35 - 2683 4930 2670 Production 10379' 9 -5/8" 47# L -80 34 - 10413 34 - 8731 6870 4760 Liner 272' 7 "26# L -80 10148 - 10420 8514 - 8737 7240 5410 Liner 1228' 2 -7/8" 6.16# L -80 10424 - 11652 8740 - 8748 13450 13890 Liner Perforation depth: Measured depth: - SEE ATTACHED _ _ True Vertical depth: _ — Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13Cr80 33 - 10195 33 - 8552 Packers and SSSV (type, measured and true vertical depth) 4 -1/2" TIW HBBP Packer 10111 8484 12. Stimulation or cement squeeze summary: 8 I Intervals treated (measured): 4r 4 0 , 9 yo Treatment descriptions including volumes used and final pressure: ` t ' -'‚ d; �� '","in O 13. Representative Daily Average Production - o ection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 57 1141 5 187 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development El - Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil A 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE' GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 3 t " ti t 1 NA Contact Joe Lastufka Printed Nam e Lastufk Title Data Manager Signat e Phone 564 -4091 Date 1/9/2012 RBCCMS a(1 2 01L q � . /2,-'/2.-- Form 10-404 Revised 10/2010 Submit Original Only 14e_- A -26L1 197 -106 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base A -26L1 715/97 OH 10,410. 10,420. 8,728.57 8,736.58 A -26L1 7/5/97 SL 11,048. 11,652. 8,741.91 8,748.22 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS _SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED • MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • . • • A-26L1 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY Hn • ; � g . 8/19/2011; ***CONT FROM 08/18/11 WSR ** *(pre frac) ;LRS LOADS IA W/ 5 BBLS METH, 645 BBLS CRUDE ;SET ST #1 RM -DGLV @ 9954' MD LRS PERFORMS PASSING MIT -IA TO 4000psi PULLED EMPTY 4 -1/2" X- CATCHER FROM X -NIP @ 10099' MD MADE 4 RUNS W/ 3" DUMP BAILER, DUMPED 15 gals, 9.375' OF CEMENT FROM 10,504' SLM TO 10,495' SLM NOTE: THE IBP IS LOWER THAN THE ORIGINAL SET DEPTH OF 10486' ' ***CONT ON 08/20/11 WSR * ** 8/20/2011 I * * *CONT FROM 08/19/11 WSR ** *(pre frac) MADE FINAL RUN W/ 10' x 3" DUMP BAILER, 1DUMPED TOTAL OF 17 gals OF CEMENT FOR JOB BEGINNING DEPTH WAS 10,504' SLM, FINAL DEPTH IS 10,496' SLM i ** *WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED * ** , 9/8/2011; ** *WELL S/I ON ARRIVAL ** *(pre frac) ;RUN 2.50 CEN, TEL, 1.50 SAMPLE BAILER, LOC TT @ 10177' SLM 10191' ELMD +14' COR, 'TAG BOTTOM @ 10493' SLM 10,507'ELM, SAMPLE OF CEMENT ,SLOTTED LINER OPEN, 87' OF RAT HOLE F /BTM OF MILL OUT WINDOW ** *WELL LEFT S/I ON DEPARTURE PAD OPP NOTIFIED * ** , 12/16/2011; ** *Job continued from 12 -15 -11 WSR * ** T /I /0= 150/0/10 LRS Assisted SLB with a Frac. Heat frac tanks and Mineral Oil to 100* F. Pumped 13.1 bbls DSL down the IA to maintain 3500 psi while SLB performed a Frac. Bled IAP (7.2 bbls). Tags hung, j IA valve left open. FWP's= 500/1000/10. 12/16/2011 *SLB Frac * ** Job Scope: Fracture Sag « <InterAct Publishing »> Continued from j 115 Dec 11. Spot in frac equipment. Pump 2 data fracs. Could not get a good ' analysis on data frac due to possible influences of lateral on leak off and net pressure. Datafrac analysis showed frac gradient = 0.55, ISIP = 981 psi, Pc = 981 'psi, Tc = 0 min, eff = 0. Design parameters for frac were based on previous Sag I k/ fracs. Pump frac at 20 bpm using 40# XL gel: Pad stage of 400 Bbls, 1 PPA Flat stage, ramp 1 PPA - 4 PPA in 150 bbls, ramp 4 PPA - 8 PPA in 225 bbls. Call flush ' at 218 bbls into flat 8 PPA stage. Flush volumes of 43 Bbls linear gel, and 59 bbls 'mineral oil. Seven Bbls of mineral oil in surface lines, and 51 Bbls in the well, placing i freeze protect at 3420'. Pnet for frac = 1950 psi. Pumped at total of 116,426 Ibs of 320/40 Carbolite propant, of which 100,713 Ibs were placed behind pipe and 15,716 Ibs in liner. Propant top at —9280'. ** *Job Complete * ** FLUIDS PUMPED LBS 116,426 20/40 CARBOLITE 116,426 TOTAL • 0 FLUIDS PUMPED BBLS 85 LVT -200 MINERAL OIL 518 20# LIN GEL 1318 40# XL GEL 5 METH 645 CRUDE 13.1 DIESEL 2584.1 TOTAL FLUIDS PUMPED GALS 17 CEMENT 17 TOTAL - 4-1116" CM/ • ik-26 SAFETY NO1111"•4-1/2" CHROME TBG HORIZONTAL WEILHEA D = McEVOY WELL: 70° 6 10600'. TOP OF 2-71" LNR DEPLOY SLV ACTUATOR = BAKER L1 RELEASED 6 10424' (1' OUTSIDE OF WINDOW). W8 KB. ELEV = 87.64 DROPPED DURING RECOVERY-SITTING ON TOP OF SAND BF. ELEV = 51.89' I.TC* - -- - - - -- - 3106 Max Angle = 6° 0 10663 1 2074' H4-1/2" CAMCO SSSV LAND NIP, ID = 3.81" 1 Datum MD = ' Datum TVD = 8800' SS 2598' 9-5/F DV FR 1 13-3 / 8 CSG, 721, L-80,10 = 12.347" H 2683' I-Ai III 1 ST MD ND GAS LIFT MANDRELS DEV TYPE VLV LATCH PORT DATE Minimum ID = 3.80" @ 10183' 6 3069 3067 'l0 OTIS OW RM 0 08/19(11 5 5067 4651 '45 OTIS DMY RM 0 02/15/10 4-112" MILLED PKR SWN NIP 4 6580 5735 '40 OTIS DMY RM 0 08/19/11 3 8046 6869 '45 OTIS OW RM 0 02/15/10 2 9811 8245 '39 OTIS DMY RA 0 09/05/91 SAFETY NOTES: WARNING: RADIO TRANSMITTER IN 1 9954 8358 ' 37 ans CMY RM 0 08/19/11 WEATHER MONITORING SHACK MUST BE TURNED OFF BEFORE ANY WELL WORK INVOLVING 1 10099' H4-1 /2" PKR SWS NIP, ID = 3.813" 1 EXPLOSIVES CAN BEGIN. CONTACT PAD OPERATOR 1 10110' HTBG AlsICHOR LATCH, ID = 3.93" 1•14 101 1 1' 1--19-5/8" X 4-1/2" TM/ HBBP PKR, ID = 4.0" 1 D0116. H4.. MILLOUT EXTENSION, ID = 4.8T' 1 9-5/8" X 7" BOT LNR FIGR W/ TIEBACK SLV 10148' L 10120' H5-1/2" X 4-1/2" XO,ID = 3.958" 1 10162' H4-1/7' PKR SWS NP, ID = 3.813" 1 1 4-1/2" TI30, 12.61, 13-CR .0152 bpf, ID = 3.958" H 10195' 10183'1 4-1/2" PKR SWN NIP, (MILLED 06197), ID = 3.80" aftrissisliassmbirsaisis • 3' '2"■ • "/. • ' 1 "r . 10196' H4-1/2" WLEG, ID = 3.958" 1 REF LOG: CBUGR ON 09/13/82 10191' H ELMD TT LOGGED XYJXX/XX 1 ANGLE AT TOP PERF: 36* 0 10413 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10413 - 10439 C 01/3196 3-3/8" 6 10520 - 10560 C 06/02/97 ■ .........., 7" MILLOUT WINDOW (A-26L1) 1041 0-10420' 3-3/8" 4 10520 - 10570 C 06/02/97 ./..."-- 2-7/8" 4 10574 - 10641 C 06/0297 10424' 143.75" BKR DEFLOY GS SLV, ID = 3.00" 1 2-7/8" 4 10651 - 10676 C 06/02/97 2-7/8" SLID 11048 - 11619 SLOT 06/27/97 10429 -13-1/2" X 2-7/8" X0, ID = 2.37" 1 1T0P OF CEWENT (08/1 9/11) H 10496' .0111011111111111 A,..H ................ 1 (12/22/09) H ? 13-3/8" BKR IBP (TAGGED 8/19/11) H 10526' ......= FISH - IBP ELENENTS (11/20/09) ? iit %., im .. •. 1 11818' 1-1PBTD 1 FISH: RETRBVABLEVVHPSTOCK 10519' -... ■ ■ \ \ RELEASED (TAGGED 10/02/09) .111111 2-7/8" SOLID LNR, -I 11048' ■ N• \ \ 1 TOP OF SAND/ CMT (TAGGED 12/17/07) 1 10523' see■s 6.041, L-80 STL, IIIIIIIIIIII .058 bpf, ID = 2.441" .. \ 9 ...••• , 44 P.......I 2-7/8" SLTD LNR, 6.041, L-80 STL, 11652' ' 4• tt•AttO, .•*** ..glor 7" LNR, 261, L-80, .0383 bpf, ID = 6.276" 11338' '.v.v-ww.v.v-v. .058 bpf, ID = 2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT OW14182 ORIGINAL COMPLETION 02127/10 DAV/PJC GLV C/0 (02/15/10) WELL: A-26L1 09/07197 016 RWO 12/16/10 CSR/PJC LNRI NAPE/ PTD CORRECTIONS PERMT fsb: 1821170 / 1971060 07/05197 CT D CT D SIDETRACK (A-28L1) 08/22/11 VVEC/ PJ GLV C/0 (08/19/11) AR No: 50-029-20794-00 / (60) 11/21/09 GJF/SV FISH - BP ELEMENTS (11 • • ' 08/22/11 WEC/ PJ DUMP CMT (0820/11) SEC 35, T11N, R 13E 2541' FNL & 1703' FEL 12/09/09 11/443IINSV SET IBP (12/08/09) : 01/02/12 PJC DRAWING CORRECTIONS 01/01/10 BSE/RFC DUWED SLUGGITS (12/22A19)! BP Exploration (Alaska) ON OR BEFORE PL E W M A T EIA L U N D ER TH IS M ARK----------- PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 07/19/99 RUN RECVD 97-106 EOW SRVY 97-106 EOW SRVY 97-106 NGP-MD 97-106 NGP-MD 97-106 NGP-TVD 97-106 NGP-TVD 97-106 8136 97-106 8139 97-106 PROD-GAS LIFT ~DRILLEX ~DRILLEX ~10420-11703 ~0420-11543 PB1 ~8649-8661 ~'649-8653 PB1 ~'~2,3,7,8,12,13 SPERRY GR ~PERRY GR PB1 ~io295-1o~95 ~ ~ /~7 10300-11703 10300-11543 PB1 08/28/97 08/28/97 FINAL 10/08/97 FINAL 10/08/97 FINAL 10/08/97 FINAL 10/08/97 10/15/97 2-6 10/15/97 FINAL 10/22/97 ~O~PLETmO~ DAT~. ~ ?/y ~?/ ~ ~ ~ /f~ /4 7/ To ? / ~ /9 7/ 10-407 DAILY WELL OPS Are dry ditch samples required? yes ~_~And received? yes Was the well cored? yes ~_~Analysis & description received? Are well tests required?\l,,.,yes.,., ~.Received? ~ Well is in compliance ~ In~kial COMMENTS y~ T D BOX -- GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11474 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape ~,-26 L1 PRODUCTION PROFILE/GLS 971 002 I 1 B- 16 PRODUCTION PROFILE 9 71 0 04 I 1 C-13 WHIPSTOCK RECORD 9 70 915 I 1 E- 11 A BACKOFF RECORD 970 92 8 I 1 !G-5 STATIC TEMP & PRESS SURVEY' 9 71 001 I 1 iH. 10A CHEMICAL CU'I-i'ER RECORD 9 71 0 0 7 I 1 J-03 ITUBING PUNCH RECORD 970 91 4 I 1 M-10 GAS LIFT SURVEY 97091 8 1 1 M- 10 PRODUCTION PROFILE 9 70 91 8 I 1 M-15 GAS LIFT SURVEY 97091 8 1 1 M- 15 PRODUCTION PROFILE 9 70 91 8 1 1 -M. 30 PROD.LOG/LEAK DETECTION' 9 71 0 03 1 I ,, N- 17 PERFORATING RECORD 971 0 01 I 1 N- 19 PERFORATING RECORD 9 71 0 05 I 1 S-35 PROD. PROFILE W/DEFT 970 913 1 1 S-35 PROD. PROFILE W/DEFT 970913 1 1 Z-22 B LEAK DETECTION LOG 9 70 92 7 1 1 ,, ZA. oo9 10/21/97 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEiv- u GasCons, Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received b CI I:::! I I--I-- I !~] G S I:~: I::1 ~ I I-- I:::: S WELL LOG TRANSMITTAL To: State of Alaska October 15, 1997 Alaska Oil and Gas Conservation Comm. 3001 Porcupine Dr. _~4 ~ Anchorage, Alaska 99501 MWD Formation Evaluation Logs - A-26L1 & A-26L1PB1, AK-MW-70181 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Yah Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 2 LDWG formatted Discs with verification listings. APl#: 50-029-20794-60 & 50-029-20794-70 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9¢7) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company 0 I:! I I--I--I N G WELL LOG TRANSMITTAL To: State of Alaska October 8, 1997 Alaska Oil and Gas Conservation Comm. Atm.: Lori Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 ~ j I C)~ MWD Formation Evaluation Logs A-26L1 & A-26L1 PB 1, AK-MW-70181 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention off Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 A-26Ll: 2" x 5" MD Gamma Ray Logs: 50-029-20794-60 2" x 5" TVD Gamma Ray Logs: 50-029-20794-60 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia A-26L1 PBI: 2"x 5" MD Gamma Ray Logs: 50-029-20794-70 2" x 5" TVD Gamma Ray Logs: 50-029-20794-70 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9¢7) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company ' STATE OF ALASKA ALASI' _ AND GAS CENSER VATION .;MISSION WELL COMPLETIOT I OR RECOMP LETIO ' ; EPORT AND LOG 1. Status of Well Classification of Service Well OIL~ix~ GAS ;~ SUSPENDEE: ~ ABANDONED ,.~ SERVICE 2. Name of Operator BP Explore t/on 13. Address P. O. Box 196612, Anchoraqe Alaska 99519-6612 4. Location of well at su rface " - 2541' FNL, 1703' FEL, Sec.35, T11N, R13E At Top Producing Interval 659' FSL, 319' FWL, Sec.29, T11N, R13E ~,~,~1~t At Tot ~]~lD,,,~h 1275 F4¥f_, 676 FEL, Sec. 27, T11N, R13E Elevation in feet (ind KBE= 87.69 icate KB, DF, etc.) 6. Lease Designation and 028287 Serial No. 7. Permit Number 97-106 !8. APl Number 5o- 029-20794-60 i9. Unit or Lease Name Prudhoe Bev Unit 10. Well Number A-26L 1 11. Field and Pool Prudhoe Bay ?ield/Prudhoe Bay Pool i 12. Date Spudded i 113. Date T.D. Reached i 6/19/97 ~ 7/3/9 7 i17. Total Depth (MD+TVD) i 11,703. 8661 122. Type Electric or Othe GR/CCL i14. Date Comp., Susp. or 7/4/9 7 !18. Plug Back Depth (MD+T VD)i 19. Directional Survey ! ,. ! 11,618, 8660 i YES ',x~:' NO r Logs Run Aband. ;15. Water Depth, if offsh ore i16. No. of Completions n/a feet MSL I one 20. Depth where2074SSSVfeetSetMD 121. Thickness of Permafro st i approx1900' i23. CASING, LINER AND CEMENTING RECORD CASING SIZE 2- 7/8" WT. PER FT. 6.16# GRADE L-80 SETTING DEPTH ME: TOP BOTTOM 10423 11618 HOLE SIZE 3-3/4" CEMENTING RECORE uncemented slotted liner '25. TUBING RECORD 24. Perforations open to Production (MD+TVD of Top and Bottom and interval, size and number ) 10,423-11,618, 8660-8661' TVD slotted liner SIZE i DEPTH SET (MD) PACKER SET (MD) ACID, FRACTURE, CEMENT SGUEEZE, ETC '26. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST 'Date First Production !Method of Operation (Flow ing, gas lift, etc.) 7/11/97 ~ FL Date of Test iHours Tested !PRODUCTION FOR ;OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO ; [ iTEST PERIOD i~ Flow Tubing ~iCasing Pressure ;CALCULATED iOIL-BBL GAS-MCF iWATER-BBL :OIL GRAVITY-APl (corr) '.Press. i 124-HOUR RATE 28. CORE DATA Brief description of lith elegy, porosity, fracture s, apparent dips, and pre sence of oil, gas or wate r. Submit core chips. ORIGINAL Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE TSAG TSHU GEOLOGIC MARKEF NAME MEAS. DEPTI- 10410 10462 TRUE VERT. DEPTI- 8639 8670 30. :MATION TESTS Include interval tested, pressure data, all fluids GOR, and time of each pha se. recovered and gravity, 31. LIST OF ATTACHMENTS 32. hereby certify that the foregoing is true and co Signed ,~L['~ ~ rrect to the best of my k nowledge Title ~..'1- I-)rillin.q T~.c. hnin~l A.q.~i,~tRnt Date General: This form is des igned for submitting a co all types of lands and le ases in Alaska. Item 1' Classification of Service Wells: Gas injec water disposal, water sup ply for injection, observ Item 5: Indicate which el evation is used as refere given in other spaces on this form and in any atta Item 16 and 24 · If this completion), so state in in item 27. Submit a sep data pertinent to such in well is completed for sep item 16, and in item 24 s arate form for each addit terval. Item 21' Indicate whether from ground level (GL) o Item 23: Attached supplem ental records for this we ing and the location of t he cementing tool. Item 27: Method of Operat ion: Flowing, Gas Lift, R jection, Gas Injection, S hut-in, Other-explain. Item 28: If no cores take n, indicate "none". INSTRUCTIONS mplete and correct well c tion, water injection, st ation, injection for in-s nce (where not otherwise chments. arate production from mor how the producing interva ional interval to be sepa r other elevation (DF, KB II should show the detail od Pump, Hydraulic Pump, ompletion repod and log on eam injection, air inject ion, salt itu combustion. shown) for depth measurem ents e than one interval (mult iple Is for only the interval reported rately produced, showing the , etc.). s of any multiple stage c ement- Submersible, Water In- Form 10-407 Well: A-26 L- 1 Accept 6/17~97 Field Prudhoe Bay Spud 6119~97 APl 50-029-20794-60 Release 7~5~97 Permit 97-106 CTD Unit Nordic #1 Date Day Depth 6/18/97 1 Accept rig at 23:00 hours, 6-17-97. MIRU. NU BOP. PU injector. Stab pipe. MU connector. Testing BOPs at report time 6/19~97 2 10410 Continue testing BOPs. Problems with leaking blind/shear and leaking swab and master. Repair same. SIWHP = 1000. Attempt to bullhead kill. Poor injectivity. RIH with nozzle to 5000' and circulate out gas. Well on vacuum. RIH w/one-step window milling BHA.. Tagged the XN and corrected depth. Stalled once then no additional motor work. Locate top of whipstock at 10406'. Mill window from 10410' - 10410.7'. Bottoms up returns gassy. Hold back pressure and circulate out gas at report time 6/20/97 3 10455 Circulate out gas w/300 psi back pressure. Began milling. Window milled fairly quickly. Penetration rate slow once mill got into formation. Working pipe just off btm helped. Bottom of window at estimated 10420 ELMD. Drilled 4 ft of rathole and worked string mill around window slot. Pulled out for drlg BHA. Pilot mill worn normally. String mill missing quite a few cutters, 1/8" under gauge. Picked up PDC bit and 2.8 deg bent mtr (short radius) and stuffed same into hole. Unable to perform shallow MWD test, too tight. MWD not working on bottom. Trip for same. Tagged at 10421' (corrected). Drill ahead. ROP is 22 fph in the Shublik. One Trip Window Milling Summary: 6' window milled in approx. 2 hours. 4' pilot hole milled in approx. 4 hours. Problems to address - pumping turbo mill off bottom in the pilot hole, losing too many metal munchers off string mill. Overall it looks very good! 6/21/97 4 10775 Drill ahead. ROP started at 22 fph in the Shublik. 2.8 Short radius mtr gave a little more turn than required. Drilled from 10421 to 10523 at which time we were horizontal at the bit. Pulled 2.8 deg short radius and ran 1 deg conventional tandem mtr. Continued drilling from 10,523 to 10,775. 6~22~97 5 11,156 Drilled from 10755 to 10902 with left hand walk. Flipped over toolface and continued drilling from 10902 to 11076'. Unable to get weight to bit. Changed out to new fluid system. Drilled 11156 with considerable trouble holding tool face. Drilling at 11156 6/23/97 6 11,267 Drilled from 11156 to 11267. Had unstable hole from 11175-11185. Ream section. Pulled out to changemtr and dump Sperry memory. Bit green. Re-ran same. RIH and tied in. CT developed pin hole leak at reel at 10988' bit depth. POH. LD BHA. Displace CT with seawater then nitrogen. Second pinhole leak developed while displacing CT. Remove reel. Prep to install new reel. 6/24/97 7 11,356 Swap to new reel. 14,700 ft of 0.;224 wall coil. Sweep coil with dart. PU BHAw/1.25 deg mtr. Encountered bad hole from 10950 on down while trying to get to btm. Shale not in good shape. Hole sticky. Hole very bad from 11125 to 11135. Tag bottom at 11267. Short trip to window. Drill from 11267 to 11356 holding angle at 94.6 deg. looking for Sag. Pressure increased. Possible plugged nozzle. Pull to window with no significant overpulls. Open circ. sub. POH. Found motor locked up. Bit green. Make up new motor to bit #2 and hang in slips to test. Driller closed blind shears rather than annular. LD motor. Prep to swing blinds and inspect. 6/25197 8 11,544 Fixed and re-tested blind/shears. OK. PU BHA w/1.25 bent mtr. Tagged same bad shale bridges ¢___. 10950. Work bad section to 11110 then broke through. Washed to btm. Re-oriented and logged to correct depth. Drilled ahead from 11356 to 11383'. Added 150 bbls Soltex/Resinex to mud to stabilize shale. Drill from 11383' looking for Sag. Increase in P rate at 11410'. Drill to 11447'. Backream to window-tite 10950- 11150'. RIH. Set down at 10998' and workto getto 11150'. Packing off, pulling tite. Clean to TD. Tie-in, add 8.1'. Drill from 11447 to 11544'. Poor quality sand samples, but probably in Sag. Continue losing mud due to packing off. Backream to window-tite 10950-11150'. Full returns. Had to orient to get thru window. Ream in hole adding new weighted mud. Set down at 11075'. Orient. 6/26/97 9 11,544 Get past 11075', RIH to 11310'. Tie-in. RIH and tag TD. Finished mud swap. Losing 0.3 bpm. PUH and wash back through bad shale section. Packing off, still losing mud. RIH and tagged @ 10982. Work various upper right quadrant toolfaces, different flowrates, speeds trying to get by w/o success. Discuss. POOH to change BHA. RIH with BHA #6 to open hole sidetrack. Tie-in at window-add 17'. RIH to 10950'. Spot 14 bbls liquid casing as LCM pill in old hole from 10950-10600'. Park at 10607' and begin 20' timed backream to start sidetrack trough. 6/27/97 10 1064'7 Finished timed backream up to 10587. Begin open hole sidetrack with timed downream 10587-10607'. Repeat timed downream at a faster rate over 10587-10607'. Drill new hole from 10607-617'. Ream and backream from 10567-617' in 7 passes. Drill from 10617-10647'. 6/28/97 11 10,942 Drill to 10648'. POOH for BHA. Change bit, motor. RIH w/BHA#7 (1° motor). Tie-in to flag, orient to enter new hole. Drill from 10648-10942'. Backream to window. Tie-in, add 10.0'. RIH and set down at 10473'. Orient. 6/29/97 12 10,952 Orient in liner to 50L. RIH thru window. Wash down and tag again @ 10473. Cannot get by. Pull back into casing. Toolface had swung around while working to 90R. Re-orient to 47L. Wash down build section and tag again @ 10473. Pick up and try faster speed- no success. Pulled BHA and picked up 2 deg. motor and bull nose reamer (cutters only on taper, not OD). Orient to 56L before window. RIH, tag ledge and ream thru. Tie-in at window and verified ledge is at 10473'. RIH to 10673' to verify OH sidetrack is open. Ream and backream ledge area over 360 deg in 8 passes. RIH to 10550' to verify clear. POOH for bit, motor. RIH with BHA #9 (bit, 1° motor). Orient to 51L to go thru window. RIH and set down on ledge. Orient 1 click and try it again w/o success. POOH for reamer. Change out bit for reamer. RIH with BHA #10 (reamer on 1° motor). 6/30/97 13 10,993 RIH with BHA #10 (reamer on 1° motor). Wash through build section. Very little motor work. Work toolface around the clock. POOH. Perform weekly BOP test. RIH w/BHA #11 (1.5° mtr and bit). Orient to go thru window. Set down at 10450' without pump. Ream thru this spot and by prior ledge at 10473' with no resistance. Tie-in to prior flag-add 5'. Precautionary ream tite hole beginning at top of OH sidetrack at 15'/min to TD at 10939' CTD. Tie-in with GR at 10900' and add 13'. Drill from 10952'-10993'. 7/1/97 14 11,4113 Drill from 10993 to 11029. Stacking problems. Back reamed to liner. Fixed #2 pump. Swapped to new mud. Washed open hole to bottom. Tie-in, add 2.0'. Continued drilling from 11029 to 11067 where the Sag sand was encountered, good drlg break. Re-oriented and continued drilling from 11067 to 11130' and had a better drilling break with slight mud loss. Drill to 11221'. Backream to top of OH sidetrack at 10595'. Tie-in at 10900' (add 4.0') while losing 18 BPH and when finished were losing 36 BPH. Add 4 ppb liquid casing to mud while RIH. Drill from 11221 to 11322' dropping angle to catch Sag in anticipated downthrow of fault that showed on GR at 11220'. Losses decreased to 3 BPH, but were having trouble with MWD signal (due to LCM). Backream to 10630' and regained signal. Tie-in at 10920' and were on depth. Drill from 11322'- 11413' while nosing down to 8648' TVD and no Sag yet-5 BPH loss. 7/2/97 15 11,695 Drill from 11413-11450. Drilling brk occured at 11450. MWD data poor due to reduced flowrate from higher pump pressures after LCM was added to mud. Pulled out and changed out mtr, MWD, and bit. Mud motor and MWD pulser working tight, probably from LCM. Ran back in and tied in @ 10900 ft. Added 2 ft. (TD 11452) Drilled ahead. GR confirmed Sag was re-entered at 11450. Drilled while dropping TVD to 11689', becamke stuck. Spot dead crude and got pipe free. Drill to 11695'. Hole sticky, motor pressure increased indicating stator chunked out. POOH, motor had parted at Adjustable U Housing. 7/3/97 17 11,703 Picked up TIW stinger & 1-1/4 wash string. Tagged packoff bushing and spaced out. Picked up pups and Baker Hyd GS, DS tools. Ran in hole. Ran liner in open hole without problem but tagged suddenly at 11649 uncorrected depth. Tried several times at various speeds-tag same place. Could not circulate with full returns either sitting on btm in compression or up in tension. Acted like Baker deployment sleeve was hanging up in open hole. Top of liner was estimated at 10430 corrected depth. Discussed and decided to release GS running tool. Picked up wash string above liner and tagged top of deployment sleeve at 10438 CTD. Repeated tag 2 more times-same place. Picked up into 7 inch liner and tagged top of whipstock at 10424.6 CTD. This leaves top of deployment sleeve at 10423.4 corrected depth, approximately 3-1/2 ft into open hole. Pulled out. RU Schlumberger E-line, run GR/CCL to verify Liner Deployment Sleeve is outside 7" liner. PU fishing tools to retreive Whipstock, TIH. 7/4/97 17 11,618 PBTD Picked up TIW stinger & 1-1/4 wash string. Tagged packoff bushing and spaced out. Picked up pups and Baker Hyd GS, DS tools. Ran in hole. Ran liner in open hole without problem but tagged suddenly at 11649 uncorrected depth. Tried several times at various speeds-tag same place. Could not circulate with full returns either sitting on btm in compression or up in tension. Acted like Baker deployment sleeve was hanging up in open hole. Top of liner was estimated at 10430 corrected depth. Discussed and decided to release GS running tool. Picked up wash string above liner and tagged top of deployment sleeve at 10438 CTD. Repeated tag 2 more times-same place. Picked up into 7 inch liner and tagged top of whipstock at 10424.6 CTD. This leaves top of deployment sleeve at 10423.4 corrected depth, approximately 3-1/2 ft into open hole. Pulled out. RU Schlumberger E-line, run GR/CCL to verify Liner Deployment Sleeve is outside 7" liner. PU fishing tools to retreive Whipstock, TIH. 7/5/97 18 Pulled fish w/6k overpul to tail pipe. Stopped w/btm of whipstock estimated at SN nipple. Could not get past. Could not wedge fish solidly there either. Total of 27 jar hits used. Released from fish and pulled out. Picked up three drill collars and accelerator to assist jars. Ran in and relatched fish on btm at estimated 11427 CTD. Pulled back to tail pipe with 6K drag again. Fish stopped with btm estimated at end of tail pipe. Rattled fish along 7 inch liner to try to clean up same. Picked up and worked fish into tail pipe. Jarred a total of 7 times and jars quit working. Made 3 ft of progress with fish in tailpipe. Fish wedged in tail pipe firmly. Released from fish and pulled out to change jars. Tih, Latch fish,begin jarring. Fish came free. Push fish downhole, POOH. Recovered Whipstock Releasing Slide. TIH to displace hole w/sea water. 7/6/97 19 Finished pulling out of hole, displacing same with sea water. RD tools. Hauled used mud to MI. Cleaned pits, blew down coil, unstabbed pipe from injector head. Nippled down BOP's and installed tree cap. Rig released at 1600 hrs. 7/5/97 ' ..... 1 ~-x?, /l~ 7/18/~7 11:45AM .... PB1 E LL SURVEYS BP EXPLORATION ALASKA INC. END OF WELL SURVEY REPORT FOR THE A-26 L1 July 18, 1997 I VERTICAL SECTION USED ' 312.10° Relative to TRUE NORTH RKB "87'70' I I t NOTE 'GRID N/S AND ENV OFFSETS ALSO GRID ASP X AND Y ARE RELATIVE TO GRID NORTH 'GRID N/S AND RAN OFFSETS ARE REQUIRED FOR GEOLOGICAL WORK 'TRUE N/S AND ENV OFFSETS ARE RELATIVE TO TRUE NORTH I ALL AZIMUTH VALUES ARE RELATIVE TO TRUE NORTH OFFSETS ARE CALCULATED TO GRID AND TRUE NORTH AS INDICATED GRID CONVERGENCE 1.17° I "~GNETIC DEC. TO TRUE NORTH 28.37° Calculated June 18. 1997 I .]EPARED BY: DRILEX DIRECTIONAL CO. DRILEX SYSTEMS, INC. MWD CO. SPERRY SUN COMMENTS MD Inc. Dir' SS DEPTH VS TRUE TRUE Build Turn Dogleg GRID GRID ASP Y ASP X ft deg deg ft ft NI-S E/-W degl100 degl100 degl100 N/-S EI-W ff ft 10300.00 34.75 324.00 8550.50 0.00 3152.30 -3220.60 0.00 0.00 0.00 3085.90 -3284.30 5,950,977.0 650,410.7 10410.00 34.75 324.00 8640.90 61.40 3203.00 -3257.50 0.00 0.00 0.00 3135.90 -3322.20 5,951,027.0 650,372.8 10442.40 47.99 319.01 8665.10 82.40 3219.70 -3270.80 40.90 -15.40 42.10 3152.20 -3335.90 5,951,043.5 650,359.1 10462.20 56.50 315.97 8677.30 98.00 3231.20 -3281.40 43.00 -15.40 44.70 3163.50 -3346.70 5,951,055.0 650,348.3 10492.30 68.73 306.07 8691.10' 124.60 3246.60 -3301.60 40.60 -32.90 50.00 3180.50 -3367.30 5,951,072.0 650,327.7 10517.50 80.07, 302.17 8697.90 148.60 3262.10 -3321.70 45.00 -15.50 47.40 3193.60 -3387.60 5,951,085.0 650,307.4' 10547.00 89.40 299.97 8700.60 177.40 3277.30: -3346.80 31.60: -7.50 32.50 3208.20 -3413.00 5,951,099.5 650,281.9 _. Tie In point from ...PB1 10575.00 91.00 296.77 8700.50 204.60 3290.60 -3371.40 5.70 -11.40 12.80 3221.10: -3438.00 5,951,112.5 650,257.0 '~, 10592.00 92.60 296.17 8699.90 221.00 3298.10 -3386.60 9.40 -3.50 10.10 3228.30 -3453.30 5,951,119.5 650,241.7 ,,'..' 10621.70 90.88 297.97 8699.00 249.601 3311.60 -3413.10 -5.80 6.10 8.40 3241.30 -3480.00 5,951,132.5 650,215:0 10651.60 95.70 293.57 8697.30 278.30 3324.60 -3439.90 16.10 -14.70 21.80 3253.70 -3507.10 5,951,145.0 650,187.9 ._ 10684.80 95.40 290.77 8694.10 309.30 3337.10 -3470.50 -0.90 -8.40 8.40 3265.50 -3537.90 5,951,157.0 650,157.1 10713.90 96.10 288.47 8691.20 336.10 3346.80 -3497.80 2.40 -7.90 8.20 3274.70 -3565.40 5,951,1 $6.01 650,129.6 10743.60! 97.50 286.37 8687.70 362.90 3355.60 -3525.90 4.70 -7.10 8.50 3282.90 -3593.70 5,951,174.0 650,101.3 -- 10772.70 98.10 283.97 8683.70 388.60 3363.20 .3553.801 2.10 -8.20 8.40. 3289.90 -3621.70 5,951,181.0 650,073.3 10804.20 97.91 280.97. 8679.30 415.70 3369.90 .3584.20 -0.60 -9.50 9.50 3296.10 -3652.30 5,951,187.0 650,042.6 10835.50 97.50 277.57 8675.20 441.80 3374.90 -3614.80 -1.30 -10.90 10.80 3300.40 -3683.00 5,951,191.5 650,011.9 10864.70 97.80 274.27 8671.30 465.10 3377.90 -3643.60 1.00 -11.30 11.20 3302.80 -3711.801 5,951,194.0 649,983.1 10893.30 96.90 276.17 8667.60 487.80 3380.50 -3671.90 -3.10 6.60 7.30 3304.80 -3740.10 5,951,196.0 649,954.9, 10923.90 95.60 277.97 8664.30 512.70 3384.20 -3702.00 -4.20 5.90 7.20 3307.90 .3770.40 5,951,199.0 649,924:6 "' 2 a-2611eow.xls A-26L1 AND 7/18/ ? 11:45 AM .... PBI END OF WELL SURVEYS COMMENTS MD I Inc. Dir SS DEPTH VS TRUE TRUE BuildI Turn Dogleg GRID GRID ASP Y ASP ~ ft deg deg ft ft N/-S E/.W deg/100 degl100 degl100 N/.S E/.W ft ft !~ , 10952.80 95.10 281.47 8661.60 537.00 3389.10 -3730.40 -1.70 12.10 12.20 3312.20 -3798.90 5,951,2C3.5 649,896.1~' 10981.00 93.90 281.47 8659.40 561.20 3394.70 -3758.00 -4.30 0.00 4.30 3317.20 -3826.50 5,951,208.5 649,868.-~ 11012.30 95.30 276.57 8656.90 587.30 3399.60 -3788.80 4.50 -15.70 16.20 3321.50 -3857.40 5,951,213.0 649 837.5! 11047.40 93.20 272.07 8654.20 615.00 3402.20 -3823.60 -6.00 -12.80 14.10 3323.40 -3892.30 5,951,21 5.0 649,8-02.6---~.~ 11077.80 91.40 267.27 8653.00 637.40 3402.00 -3854.00 -5.90 -15.80 16.90 3322.60 -3922.70 5,951,21 4.0 649,772.3---~.~ 11106.30 92.10 271.97 8652.20 658.40 3401.80 -3882.50 2.50 16.50 16.70 3321.90 -3951.20 5,951,21 3.0 649,743.~ 11139.10 91.40 277.07 8651.20 684.40 3404.40 -3915.20 -2.10 15.50 15.70 3323.80 -3983.90 5,951,21 5.0~ 649,711.1 11168.20 93.20 283.37 8650.001 709.00 3409.60 -3943.80 6.20 21.60' 22.50 3328.30 -4012.60 5,951,2! 9.5 649,682.4 lI' 11199.10 94.60 290.77 8647.90 737.00 3418.60~ -3973.20 4.50 23.90 24.30 3336.80 -4042.20 5,951,228.0 649,652.9 11228.30 94.60 297.67 8645.50 764.60 3430.50 -3999.70 0.00 23.60 23.60 3348.20 -4069.00 5,951,239.5 649,626.1 11255.60 93.40 303.27 8643.60 791.30 3444.30 -4023.20 -4.40 20.50 20,90: 3361.50 -4092.70 5,951,253.0 649,602.3 11287.30 91.40 308.37 8642.30 822.80 3462.90 -4048.90 -6.30 16.10 17.30 3379.50 -4118.'70 5,951,271.0 649,576.3 11319.30 88.00 313.27 8642.50 854.80 3483.80 -4073.10 -10.60 15.30 18.60 3399.90 -4143.40 5,951,291.5 649,551.6 11351.70 85.90 317.37 8644.20 887.00 3506.80 -4095.80 -6.50: 12.70 14.20 3422.40 -4166.60 5,951,314.0 649,528.4 11380.00 86.30 322.07' 8646.10 915.00 3528.30 -4114.10 1.40 16.60 16.60 3443.60 -4185.20 5,951,335.0 649,509.8 , 11413.40 85.20 326.97 8648.60 947.50 3555.40 -4133.40 -3.30 14.70 15.00 3470.30 -4205.10 5,951,361.5 649,489.9 11 442.70 84.90 331.97 8651.10 975.40 3580.60 -4148.20 -1.00 17.10 17.00 3495.20 -4220.50 5,951,386.5 649,474.5 11475.00 86.50 338.07 8653.60 1005.00 3609.70 -4161.80 5.00 18.90 19.50 3524.00 -4234.70 5,951,41 5.5 649,460.3 11513.90 88.07 344.57 8655.40 1038.90 3646.50 -4174.30 4.00 16.70 17.20 3560.60 -4247.80 5,951,452.0 649,447.1 11543.30 87.60 345.07 8656.50 1063.70 3674.90 -4181.90 -1.60 1.70 2.30 3588.80 -4256.10~ 5,951,480.0 649,438.9 11575.30 86.80 339.97 8658.10 1091.20 3705.40 -4191.50 -2.50 -15.90 16.10 3619.00 -4266.30 5,951,51 0.0 649,428.7 11611.40 88.33 334.57 8659.60 1123.80 3738.60 -4205.50 4.20 -15.00: 15.50 3652.00 -4280.90 5,951,543.0 649,414.1 11641.50 88.90 330.67 8660.30 1152.00 3765.30 -4219.30 1.90 -13.00 13.10 3678.40 -4295.30 5,951,56'9.5 649,399.7i '~l':L 11672.40 89.03 326.67 8660.90! 1181.60 3791.70 -4235.40 0.40 -12.90 12.90 3704.50 -4311.90 5,951,595.5 649,383.1 !.,cted TD 11703.00 89.16 322.67 8661.40 1211.50 3816.70! -4253.10 0.40 -13.10 13.10 3729.10 -4330.10 5,951,620.0 649,364.9. THESE SURVEYS ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. / ~1.1~ ,~.~ V - · ~ '~ ' ~ ' ' BIMO HADIPUTRO DISTRICT MANAGER - DRILEX SYSTEMS, INC. 3 a-2611eow.xls A-26L1 AND OF WELL SURVEYS 7/18/ 7 11:45AM BP EXPLORATION ALASKA INC. END OF WELL SURVEY REPORT FOR THE A-25 L1 PB 1 July 18, 1997 VERTICAL SECTION USED 312.10° Relative to TRUE NORTH RKB -87.7o'I I I _ NOTE ,. GRID N/S AND E/VV OFFSETS ALSO GRID ASP X AND Y ARE RELATIVE TO GRID NORTH GRID N/S AND E/W OFFSETS ARE REQUIRED FOR GEOLOGICAL WORK ... . TRUE N/S AND E/W OFFSETS ARE RELATIVE TO TRUE NORTH . ALL AZIMUTH VALUES ARE RELATIVE TO TRUE NORTH[ : OFFSETS ARE CALCULATED TO GRID AND TRUE NORTH AS INDICATED GRID CONVERGENCE ' 1.17° ~ ' ~NETIC DEC. TO TRUE NORTH · 28.37° Calculated June 18. 1997 .~PARED BY: · DRILEX [ DIRECTIONAL CO. : DRILEX SYSTEMS, INC. MWD CO. : SPERRY SUN COMMENTS MD Inc. Dir SS DEPTH VS TRUE TRUE Build Turn Dogleg GRID GRID ASP Y ASP X ft degl deg ff ft NI-S El.Wi degll00 degll00 degll00 N/-S E/-W It It 1. Actual Svy. Tie In 10300.00 34.75 324.00! 8550.50 0.00 3152.30 -3220.60 0.00 0.00 0.00 3085.9 -3284.3 5,950,977.00 650,410.70 2. KOP 10410.00 34.75 324.00 8640.90 61.40 3203.00 -3257.50 0.00 0.00 0.00 3135.9 -3322.2 5,951,027.00 650,372.80 10442.40 47.99 319.01 8665.10 82.40 3219.60 -3270.90 40.90 -15.40 42.10 3152.2 -3335.9 5,951,043.50 650,359.10 10462.20 56.50 315.97 8677.30 98.00 3231.20 -3281.50 43.00 -15.40 44.70 3163.5 -3346.7 5,951,055.00 650,346.30 10492.30 68.73 306.07 8691.10 124.60 3248.50 -3301.60 40.60 -32.90 50.00 3180.5 -3367.3 5,951,072.00 650,327.70 10517.50 80.07 302.17 8697.90 148.60 3262.10 -3321.70 45.00 -15.50 47.40 3193.6 -3387.6 5,951,085.00 650,307.40 10547.00 89.40 299.97 8700.60 177.40 3277.20 -3346.80 31.60 -7.50 32.50 3208.2 -3413.0 5,951,099.50 650,281.90 10575.00 91.00 296.77 8700.50 204.60 3290.50 -3371.50 5.70 -11.40 12.80 3221.1 -3438.0 5,951,112.50! 650,257.00 -- ': 10607.30 94.10 293.57 8699.00 235.50 3304.30 -3400.70 9.60 -9.90~ 13.80 3234.2 -3467.4 5,951,125.50 650,227.60 '~.. 10635.50 94.80 290.57 8696.90' 261.90 3314.80 -3426.70 2.50 -10.60 10.90 3244.2 -3493.6t 5,951,135.50 650,201.40 " 10663.00 95.80 289.37 8694.30 287.20 3324.20 -3452.50 3.60 -4.40 5.70 3253.0 -3519.6 5,951,144.50 650,175.40 10694.30 94.83 284.77 8691.40 315.50 3333.30 -3482.20 -3.10~ -14.70 15.00 3261.6 -3549.6 5,951,153.00 650,145.40 ~ 10723.70 95.10 282.57 8688.90 341.20 3340.201 -3510.70 0.90: -7.50 7.50 3267.9 -3578.1 5,951,159.50 650,116.90 10752.70 94.60 280.97 8686.40 366.20 3346.10 -3539.00 -1.70 -5.50 5.80 3273.2 -3606.5 5,951,165.00 650,088.50 10786.70 94.00 277.07 8683.90 394.60 3351.50 -3572.50 -1.80 -11.50 11.60 3277.8 -3640.1 5,951,169.50 650,054.90 10816.50 92.50 273.37 8682.20 418.40 3354.20 -3602.10~ -5.00 -12.40 13.40 3279.9 -3669.8 5,951,171.50 650,025.30 10845.70 91.84: 271.47 8681.10 440.80 3355.40 -3631.20 -2.30 -6.50 6.90 3280.6 -3699.0 5,951,172.00 649,996.00 10875.30 90.97 267.37 8680.30 462.60 3355.10 -3660.80 -2.90 -13.90 14.20 3279.7 -3728.5 5,951,171.00 649,966.50 10903.10 91.40 270.37! 8679.80 482.80' 3354.50 -3688.60 1.50 10.80 10.90 3278.6 -3756.3 5,951,170.00 649,938.70 10933.90 89.60 276.17 8679.50 506.80 3356.30 -3719.30 -5.80 18.80 19.70 3279.7 -3787.1 5,951,1 71.00 649,907.90 ' - 4 a-26, eow.x,s A-26L1 AND .... PB1 END OF WELL SURVEYS 7/.18/57 11:45AM COMMENTS MD Inc. DirI SS DEPTH VS TRUE i TRUE Build Turn~ Dogleg GRID GRID ASP Y ASP X i ft deg deg ft ft N/-S .10963.80 90.18 273.22 8679.60 530.60 3358.70 [ -3749..10 10992.30 9'1.58 276.77 8879..10 553.30 336.1.201 -3777.50 4.90 12.50 .13.40 3283.4 -3845.3 5,95.1,175.00 649,849.7C 11025.40 91.05 281.17 8678.40 581.00 3366.40I -3810.20 -1.60 13.30 13.40i 3287.9 -3878.1 5,951,179.50 649,816.90 11055.40 91.41 284.17 8677.70 607.10 3373.001 -3839.50 1.20 10.00 10.10 3293.9 -3907.5 5,951,185.50 649,787.50 11088.50 92.06 288.27 8676.70' 636.90 3382.20 i -3871.20 2.00 12.40 12.50 3302.5 -3939.4 5,951,194.00 649,755.60 11117.80 92.50 290.47 8675.60 663.90 3391.901 -3898.80 1.50 7.50 7.70 3311.6 -3967.2 5,951,203.00 649,727.8C 11149.00 90.88 293.97 8674.60 693.20 3403.70 t -3927.70 -5.20 11.20 12.40 3322.8 -3996.4 5,951,21 4.00 649,698.60 . 11182.30 90.20 293.97 8674.30 724.80 3417 20! -3958.10 -2.00 0.00 2.00 3335.7 -4027.0 5,951,227.00 649,667.90 'Ii~ 11213.10 90.10 300.47 8674.20 754.60 3431.301 -3985.50 -0.30 21.10 21.10 3349.3 -4054.7 5,951,240.50 649,640.30 11243.90 89.00 302.57 8674.50 784.90, 3447.40i -4011.80 -3.60 6.80 7.70 3364.8 -4081.2 5,951,256.00 649,613.70 11274.50 90.60 305.77 8674.60 815.20 3464.60= -4037.10 5.20 10.50 11.70 3381.5~ -4106.9 5,951,272.50 649,588.00 11309.30! 93.60 309.77 8673.30 849.80 3485.90 -4064.60 8.60 11.50 14.40 3402.2 -4134.9 5,951,293.50 649,560.10 11339.80 94.60 314.37 8671.10 880.20 3506.30 -4087.10 3.30 15.10 15.40 3422.1 -4157.8 5,951,313.50~ 649,537. 11371.30 95.98 318.17 8668.20 911.50 3528.90 -4108.80 '4.40 12.10 12.801 3444.3 -4180.0 5,951,335.50 649,515.001 11403.60 96.06 323.17 8664.80 943.30 3553.80 -4129.20 0.20 15.50 15.40 3468.8 -4200.8 5,951,360.00 649,494.1 11431.60 95.18 327.87 8662.10! 970.40 3576.70t -4144.90 -3.10 16.80 17.00 3491.4 -4217.1 5,951,382.50 649,477.90 11464.40 96.00 334.17 8658.90 1001.20 3605.30 -4160.70 2.50 19.20 19.30 3519.6 -4233.5 5,951,41 0.50 649,461.50 11494.80 95.70 339.97 8655.80 1028.60 3633.10 -4172.50 -1.00 19.10 19.00 3547.2 -4245.8 5,951,438.00 649,449.20 11524.50 92.50 344.57 8653.70 1054.20 3661.30 -4181.50 -10.80 15.50 18.80 3575.2 -4255.4 5,951,466.00 649,439.60 3. Projected TD 11543.00 90.50 347.44 8653.20 1069.60 3679.30 -4186.00' -10.80 15.50 18.90 3593.1 -4260.2 5,951,484.00 649,434.80 THESE SURVEYS ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE, BIMO HADIPUTRO DISTRICT MANAGER - DRILEX SYSTEMS, INC. SURVEYS ~" ~ 1 a-2611 eow.xls 7/18/~7 11:45 AM .... PB1 E Bp EXPLORATION ALASKA INC. END OF WELL SURVEY REPORT FOR THE A-26 L1 July 18, 1997 VERTICAL SECTION USED 312.10° Relative to TRUE NORTH RKB -87.70' I I NOTE GRID N/S AND EAN OFFSETS ALSO GRID ASP X AND Y ARE RELATIVE TO GRID NORTH GRID N/S AND ENV OFFSETS ARE REQUIRED FOR GEOLOGICAL WORK TRUE N/S AND E/W OFFSETS ARE RELATIVE TO TRUE NORTH ALL AZIMUTH VALUES ARE RELATIVE TO TRUE NORTH OFFSETS ARE CALCULATED TO GRID AND TRUE NORTH AS INDICATED GRID CONVERGENCE 1.17° ~"~GNETIC DEC. TO TRUE NORTH 28.37° Calculated June 18. 1997 ~PARED BY: DRILEX DIRECTIONAL CO. ' DRILEX SYSTEMS, INC. 'MWD CO. · SPERRY SUN COMMENTS MD Inc. Dir SS DEPTH VS TRUE TRUE Build Turn Dogleg l GRID GRID ASP Y ASP X ft deg deg ft ft NI-S. EI-W degll00 degll00 degll00 NI.S E/-W ft fi: 10300.00 34.75 324.00 8550.501 0.00 3152.30 -3220.60 0.00 0.00 0.00 3085.90 -3284.30 5,950,977.0 650,410.7 10410.00 34.75 324.00 8640.901 61.40 3203.00 -3257.50 0.00 0.00 0.00 3135.90 -3322.20 5,951,027.0 650,372.8 10442.40 47.99 319.01 8665.10 82.40 3219.70 -3270.80 40.90 -15.40 42.10 3152.20 -3335.90 5,951,043.5 650,359.1 10462.20 56.50 315.97 8677.30 98.00 3231.20 -3281.40 43.00 -15.40 44.70 3163.50 -3346.70 5,951,055.0 650,348.3 10492.30 68.73 306.07 8691.10 124.60 3248.60 -3301.60 40.60 -32.90 50.00 3180.50 -3367.30 5,951,072.0 650,327.7 10517.50 80.07 302.17 8697.90 148.60 3262.10 -3321.70 45.00 -15.50 47.40 3193.60 -3387.60 5,951,085.0 650,307.4 10547.00 89.40 299.97 8700.60 177.40 3277.30 -3346.801 31.60 -7.50 32.50 3208.20 -3413.00 5,951,099.5 650,281.9 Tie In point from ...PB1 10575.00 91.00 296.77 8700.50 204.60 3290.60 -3371.40! 5.70 -11.40 12.80 3221.10 -3438.00 5,951,112.5 650,257.0 10592.00 92.60 296.17 8699.90 221.00 3298.10 -3386.60 9.40 -3.50 10.10 3228.30' -3453.30 5,951,119.5 650,241.7 ~ 10621.70 90.88 297.97 8699.00 249.60 3311.60 "3413.10 -5.80 6.10 8.40 3241.30 "3480.00 5,951,132.5 650,215.0 10651.60 95.70 293.57 8697.30 278.30 3324.60 -3439.90 16.10 -14.70 21.80 3253.70 -3507.10 5,951,1 45.0 650,187.9 10684.80 95.40 290.77 8694.10 309.30 3337.10 -3470.50 -0.90 -8.40 8.40 3265.50 -3537.90 5,951,157.0 650,157.1 10713.90 96.10 288.47! 8691.20 336.10 3346.80 -3497.80 2.40 -7.90 8.20 3274.70 -3565.40 5,951,166.0 650,129.6 10743.60 97.50 286.37 8687.70 362.90 3355.60 -3525.90 4.70 -7.10 8.50 3282.90 -3593.70 5,951,174.0 650,101.3 10772.70 98.10 283.97: 8683.70 388.60 3363.20 -3553.80 2.10 °8.20 8.40 3289.90 -3621.70 5,951,181.0 650,073.3 10804.20 97.91 280.97 8679.30 415.70 3369.90 -3584.20 -0.60 -9.50 9.50 3296.10 -3652.30 5,951,187.0 650,042.6 10835.50. 97.50 277.57 8675.20 441.80 3374.90 -3614.80 -1.30 -10.90 10.80 3300.40 -3683.00 5,951,191.5 650,011.9 10864.70: 97.80 274.27 8671.30 485.10 3377.90 -3643.60 1.00 -11.30 11.201 3302.80 -3711.80 5,951,194.0 649,983.1 10893.30 96.90 276.17 8667.60 487.80 3380.50 -3671.90 -3.10 6.60 7.30 3304.80 -3740.10 5,951,196.0 649,954.9 10923.90 95.601 277.97 8664.30 512.70~ 3384.20 -3702.00 -4.20 5.90 7.20 3307.90 -3770.40 5,951,199.0 649,924.6 2 a-2611eow.xls A-26L1 AND 7/18/s? 11:45 AM ...PB1 END OF WELL SURVEYS ICOMMENTS MD Inc. Dir SS DEPTH VS TRUE TRUE Build Turn Dogleg GRID GRID ASP Y ASP XI ft deg deg ft ft N/-S E/-W deg/100 deg/100 deg/100 N/-S ! E/-W fi: ft I 10952.80 95.10 281.47 8661.60 537.00 3389.10 -3730.40 -1.70 12.10 12.20 3312.20 -3798.90 5,951,2C3.5 649,896.11 10981.00 93.90 281.47 8659.40 561.20 3394.70 -3758.00 -4.30 0.00 4.30 3317.20 -3826.50 5,951,203.5 649,8~-8~_~_~ 11012.30 95.30 276.57 8656.90 587.30 3399.60 -3788.80 4.50 -15.70 16.20 3321.50 -3857.40 5,951,2: 3.0 649,837.~ 11047.40 93.20 272.07 8654.20 615.00 3402.20 -3823.60 -6.00 -12.80 14.10 3323.40 -3892.30 5,951,21 5.0 649 802 6I ' 11077.80 91.40 267.27 8653.00 637.40 3402.00 -3854.00 -5.90 -15.80 16.90 3322.60 -3922.70 5,951,2! 4.0 649,772.3 11106.30 92.10 271.97 8652.20 658.40 i 3401.80 -3882.50 2.50 16.50 16.70 3321.90 -3951.20 5,951,21 3.0 649,743.8 11139.10 91.40 277.07 8651.20 684.40 3404.40 -3915.20 -2.10 15.50 15.70 3323.80 -3983.90 5,951,21 5.0 649,711 .-~- 11168.20 93.20 283.37 8650.00 709.00 3409.60 -3943.80 6.20 21.60 22.50 3328.30 -4012.60 5,951,21 9.5 649,682.4 · ~ 11199.10 94.60 290.77 8647.90 737.00 3418.60 -3973.20 4.50 23.90 24.30 3336.80 -4042.20 5,951,228.0. 649,6~2.~c "~ 11228.30 94.60 297.67 8645.50 764.60 3430.50 -3999.70 0.00 23.60 23.60 3348.20 -4069.00 5,951,239.5; 649,626.1 11255.60 93.40 303.27 8643.60 791.30 3444.30 -4023.20 -4.40 20.50. 20.90i 3361.50 -4092.70 5,951,253.01 649,602.3 11287.30 91.40 308.37 8642.30 822.80 3462.90 -4048.90 -6.30 16.10 17.30 3379.50 -4118.70 5,951,271.0 i 649,576.3 11319.30 88.00 313.27 8642.50 854.80 3463.80 -4073.10 -10.60 15.30 18.60 3399.90 -4143.40 5,951,291.5 649,551.6 11351.70 85.90 317.37 8644.20 887.00 3506.80 -4095.80 -6.50 12.70 14.20 3422.40 -4166.60 5,951,314.0 649,528.4 11380.00 86.30 322.07 8646.10 915.00 3528.30 -4114.10 1.40 16.60 16.60 3443.60 -4185.20 5,951,335.0 649,509.-~ 11413.40 85.20 326.97 8646.60 947.50 3555.40 -4133.40 -3.30 14.70 15.00 3470.30 -4205.10 5,951,361.51 649,469.9 11442.70 84.90 331.97 8651.10 975.40 3580.60 -41 46.20 -1.00 17.10 17.00 3495.20 -4220.50 5,951,386.5 649,474.-~ 11475.00 86.50 338.07 8653.60 1005.00 3609.70 -4161.80 5.00 18.90 19.50 3524.00 -4234.70 5,951,41 5.5 649,460.3 11513.90 88.07 344.57 8655.40 1038.90 3646.50 -4174.30 4.00 16.70 17.20 3560.60 -4247.80 5,951,452.0 649,447.1 11543.30 87.60 345.07 8656.50 1063.70 3674.90 -4181.90 -1.60 1.70 2.30 3588.80 -4256.10 5,951,480.0 649,438.9 11575.30 86.80 339.97 8658.10 1091.20 3705.40 -4191.50 -2.50 -15.90 16.10 3619.00 -4266.30 5,951,51 0.0 649,428.7 11611.40 88.33 334.57 8659.60 1123.80 3738.60 -4205.50 4.20 -15.00 15.50 3652.00 -4280.90 5,951,543.0 ! 649,414.1 11641.50 88.90 330.67 8660.30 1152.00 3765.30 -4219.30 1.90 -13.00 13.10 3678.40 -4295.30 5,951,569.51 649,399.7 ., 11672.40 89.03 326.67 8660.90 1181.60 3791.70 -4235.40 0.40 -12.90 12.90 3704.50 -4311.90 5,951,595.5 649,383.1 ~cted TD 11703.00 89.16 322.67 8661.40 1211.50 3816.70 -4253.10 0.40 -13.10 13.10 3729.10 -4330.10 5,951,620.0 649,364.9 , ITHESE SURVEYS ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. BIMO HADIPUTRO DISTRICT MANAGER - DRILEX SYSTEMS, INC. 3 a-2611eow.xls A-26L1 AND .. N OF WELL RVEYS 7/18/_ 7 11:45AM BP EXPLORATION ALASKA INC. END OF WELL SURVEY REPORT FOR THE A-26 L1 PB 1 July 18, 1997 VERTICAL SECTION USED 312.10: Relative to TRUE NORTH RKB -87.70't I t I __ NOTE GRID h;/S AND ENV OFFSETS ALSO GRID ASP X AND Y ARE RELATIVE TO GRID NORTH GRID h;'S AND ENV OFFSETS ARE REQUIRED FOR GEOLOGICAL WORK TRUE N/S AND E/VV OFFSETS ARE RELATIVE TO TRUE NORTH · ALL AZIMUTH VALUES ARE RELATIVE TO TRUE NORTH : OFFSFTS ARE CALCULATED TO GRID AND TRUE NORTH AS INDICATED I GRID CONVERGENCE · 1.17° ~"'~NETIC DEC. TO TRUE NORTH · 28.37° Calculated June 18. 1997 ~pARED BY: · DRILEX DIRECTIONAL CO. : DRILEX SYSTEMS, INC. MWD CO. : SPERRY SUN COMMENTS MD inc. Dir SS DEPTH VS TRUE TRUE Build Turn Dogleg GRID GRID ASP Y ASP X ft deg deg ft ft N/-S EI-W degll00 degll00 degll00 NI-S E/-W fl: fi: 1. Actual Svy. Tie In 10300.00 34.75 324.00 8550.50 0.00 3152.30 -3220.60 0.00 0.00 0.00 3085.9 -3284.3 5,950,977.00 650,410.70 2. KOP 10410.00 34.75 324.00 8640.90 61.40 3203.00 -3257.50 0.00 0.00 0.00 3135.9 -3322.2 5,951,027.00 650,372.80 10442.40 47.99 319.01 8665.10 82.40 3219.60 -3270.90 40.901 -15.40 42.10 3152.2 -3335.9 5,951,043.50 650,359.10 10462.20 56.50 315.97 8677.30 98.00 3231.20 -3281.50 43.00 -15.40 44.70 3163.5 -3346.7 5,951,055.00 650,348.30 10492.30 68.73 306.07 8691.10 124.60 3246.50 -3301.60 40.60 -32.90 50.00 3180.5 -3367.3 5,951,072.00 650,327.70 10517.50 80.07 302.17 8697.90 148.60 3262.10 -3321.70 46.00 -15.50 47.40 3193.6 -3387.6 5,951,085.00 650,307.40 10547.00 89.40 299.97 8700.60 177.40 3277.20: -3346.80 31.60 -7.50 32.50 3208.2 -3413.0 5,951,099.50 650,281.90 10575.00 91.00 296.77 8700.50 204.60 3290.50' -3371.50 5.70 -11.40 12.80 3221.1 -3438.0' 5,951,112.50 650,257.00' .~. 10607.30 94.10 293.57 8699.00 235.50 3304.30 -3400.70 9.60 -9.90 13.80 3234.2 -3467.4 5,951,125.50 650,227.60 ~, 10635.50 94.80 290.57 8696.90 261.90 3314.80 -3426.70 2.50 -10.60 10.90 3244.2 -3493.6 5,951,135.50 650,201.40 10663.00 95.80 289.37 8694.30 287.20 3324.20 -3452.50' 3.60 -4.40 5.70 3253.0: -3519.6 5,951,144.50 650,175.40 10694.30 94.83 284.77 8691.40 315.50 3333.30 -3462.20 -3.10 -14.70 15.00 3261.6 -3549.6 5,951,153.00 650,145.40 10723.70 95.10 282.57~ 8688.90 341.20 3340.20 -3510.70 0.90 -7.50 7.50 3267.9 -3578.1 5,951,159.50 650,116.90 10752.70 94.60 280.97 8686.40 366.20 3346.10 -3539.00 -1.70 -5.50 5.80 3273.2 -3606.5 5,951,165.00 650,088.50 10786.70 94.00 277.07 8683.90 394.60 3351.50 -3572.50 -1.80 -11.50 11.60 3277.8 -3640.1 5,951,169.501 650,054.90 10816.50 92.50 273.37 8682.20 418.40~ 3354.20 -3602.10 -5.00 -12.40 13.40 3279.9 -3669.8 5,951,171.50 650,025.30 10846.70 91.84 271.47 8681.1 0 440.80 3355.40 -3631.20 -2.30 -6.50 6.90 3280.6 -3699.0 5,951,172.00 649,996.00 10875.30 90.97 267.37 8680.30 462.60 3355.10 -3660.80 -2.90 -13.90 14.20 3279.7 -3728.5 5,951,171.00 649,966.50 10903.10 91.40 270.37 8679.80 482.80 3354.50 -3688.60 1.50 10.80 10.90 3278.6 -.3756.3 5,951,170.00 649,938.70 10933.90 89.60 276.17 8679.50 506.80 3356.30 -3719.30 -5.80 18.80 19.70 3279.7 -3787.1 5,951,171.00 649,907.90 ' ~ 'z~ ~' a-2611eow.xls A-26L1 AND .... PB1 END OF WELL SURVEYS 11:45AM COMMENTS MD Inc. Dir $S DEPTH VS TRUE TRUE Build Turn Dogleg GRID GRID ASP Y ASP X ft deg deg ft ft N/-S E/-W degl100 degl100 deg/100 N/-S' E/-W ft ft 10963.80 90.18 273.22 8679.60 530.60 3358.70 -3749.10 1.90 -9.90 10.10 3281.5 -3816.9 5,951,173.00 649,878.10 10992.30 91.58 276.77 8679.10 553.30 3361.20 -3777.50 4.90 12.50 13.40 3283.4 -3845.3 5,951,1 7=...00 649,849.70 11025.40 91.05 281.17 8678.40 581.00 3366.40 -3810.20 -1.60 13.30 13.40 3287.9 -3878.1 5,951,17.~..50! 649,816.90 11055.40 91.41 284.17 8677.70 607.10 3373.00 -3839.50 1.20, 10.00 10.10 3293.9 -3907.5 5,951,18.5=.50 649,787.50 11088.50 92.06 288.27 8676.70 636.90 3382.20 -3871.20 2.00 12.40 12.50 3302.5 -3939.4 5,951,19..Z'..00 649,755.60 11117.80 92.50 290.47 8675.60 663.90 3391.90 -3898.80 1.50 7.50 7.70 3311.6 -3967.2 5,951,20,3.00 649,727.80 11149.00 90.88 293.97 8674.60 693.20 3403.70 -3927.70 -5.20 11.20 12.40 3322.8 -3996.4 5,951,21.4.00 649,698.60 .. 11182.30 90.20 293.97 8674.30 724.80 3417.20 -3958.10 -2.00 0.00 2.00 3335.7 -4027.0 5,951,22'-.00 649,667.90! I 11213.10 90.10 300.47 ~ 8674.20 754.60 3431.30 -3985.50 -0.30 21.10 21.1 0 3349.3 -4054.7 5,951,240.50 649,640.30' 11243.90 89.00 302.57 8674.50 784.90 3447.40 -4011.80 -3.60 6.80 7.70 3364.8 -4081.2 5,951,256.00 649,613.70 11274.50 90.60 305.77 8674.60 815.20 3464.60 -4037.10 5.20 10.50 11.70 3381.5 -4106.9 5,951,272.50 649,588.00 11309.30 93.60 309.77 8673.30 849.80 3485.90 -4064.60 8.60 11.50 14.40 3402.2 -4134.9 5,951,29~.50 649,560.10 11339.80 94.60 314.37 8671.t0 880.20 3506.30 -4087.10 3.30 15.10, 15.40 3422.1 -4157.8 5,951,313.50 649,537.10 ,, 11371.30 95.98 318.17 8668.20 911.50 3528.90 -4108.80 4.40 12.10' 12.80 3444.3 -4180.0 5,951,335.50 649,515.00 11 403.60 96.06 323.17 8664.80 943.30 3553.80 -4129.20 0.20 15.50 15.40 3468.8 -4200.8 5,951,360.00 649,494.10 11431.60 95.18 327.87 8662.10 970.40 3576.70 -4144.90 -3.10 16.80 17.00 3491.4 -4217.1 5,951,3~,__..50 649,477.90 11 464.40 96.00 334.17 8658.90 1001.20 3605.30 -4160.70 2.50 19.20 19.30 3519.6 -4233.5 5,951,41 0.50 649,461.50 11494.80' 95.70 339.97 8655.80 1028.60 3633.10 -4172.50 -1.00 19.10 19.00 3547.2 -4245.8 5,951,43~.00 649,449.20 11524.50 92.50 344.57 8653.70 1054.20 3661.30 -4181.50 -10.80 15.50 18.80 3575.2 -4255.4 5,951,46~.00. 649,439.60 3. Projected TD 11543.00 90.50 347.44 8653.20 1069.60 3679.30 -4186.00 -10.80 15.50 18.90 3593.1 -4260.2 5,951,484.00 649,434.80 THESE SURVEYS ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE, 31MO HADIPUTRO DISTRICT MANAGER - DRILEX SYSTEMS, INC. TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 June 6, 1997 Ted Stagg Coiled Tubing Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bav Unit A-26L-1 BP Exploration (Alaska) Inc Permit No 97-106 Sur. Loc.: 2541'NSL, 1703'WEL, Sec. 35, T11N, Ri3E, UM Btmhole Loc: 381 I'SNL. 4689'EWL, Sec. 27, T11N, R13E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The permit is for a new segment from existing well A-26, API No. 50-029-20794-00. Production should continue to be reported as a function of the original well identifier. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice mav be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman ~ BY ORDER OF THE COMMISSION dlffenclosures cc: Department of Fish & Game, t tabitat Section w/o enci. Department of Em'inonm~ent Conservation wm encl. la. Type of work Drill Re-Entry STATE OF ALASKA ALASKA el~ *,ND GAS CONSERVATION COl~ '- PERMIT TO DRILL 20 AAC 25.005 iSSION [] Redrill [] lb. Type of well. Exploratory [] StratigraphicTest [] Development Oil [] [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator RP I::)[nlnr~ finn 3~Address -- F~ ¢) R¢~ 1.qRRI~, Annhnr~n~. Al~.~k~ .q.q.~l.q-RR12 ..~. Loca~(~d well at su rf~c~ 2541'4N.~L, 1703' WEL, Sec. 35, T11N, R13E, UPM At top of productive inte rval 659' NSL, 319' EWL, Sec.29, T11N, R13E, UPM At total depth 3811 SNL, 4689 EWL, Sec.27, T11N, R13E 12. Distance to nearest 3. Distance to nearest w ell property line ADL 028286 @ 598 feet no close approach feet 16. To be completed for d eviated wells Kckoffdepth lO,421feet Maximum hole angle 9z o 18. Casing program s~ze Ho e Casing Weight Specifications Grade Coupling Length pen Operations. L-80 I FL-4S I t edrill, Re-entry, and Dee 3 3/4" 2 7/8" 6.16# 19. To be completed for R Present well condition su mmary Total depth: measured true vertical Effective depth: measured true vertical 1453' 11,338 feet BKB 9505 feet 11,020 feet BKB 9235 feet 5. Datum ElevationKBE=(DF87.69or feetKB) 6. Property Designation 028287 7. Unit or property Name Prudhoe Bay Unit 8. Well number A-26L- 1 9. Approximate spud date 6/11/97 0. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 11. Type Bond (see 20 AAC 25.025) Number 2S 100302630-277 IAmount $200,000.00 15. Proposed depth (MDandTVD) I 1,883', 8675'TVDss feet 4. Number of acres in pr operty 2560 I7. Anticipated pressure (see 20 AAC 25.035 (e)(2) /laximum surface 3330 psig At total depth ('I-VD) Setting Depth ) RRtO(~' /.9.'~.~.~ psig Top Bottom Quantity of cement M D TVD 10,430 8656 M D TVD 11,883 8675 Plugs (measured) Junk (measured) (include stage data) uncemented slotted liner Casing Length Size Cemented Measured depth True Vertical depth Structural BKB Conductor 110 20x30 8 c. v. 146 146 S u rface 264 7 13 3/8" 3831 c.f. 2683 2683 Intermediate 10,377 9 5/8" 1610 c.f. 10413 8730 Production Liner 1190 7" 450 c.f. 10148-11338 8513-9505 Perforation depth: measured 10413-10439, 10520-10560 10574-10641, 10520-10570, 10651-10676sqz'd true vertical 20. Attachments Filing fee [] Property plat [] BOp Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirement s [] [21. I hereby certify tha,t¢,¢, the foregoing is true an d correct to the best of my knowledge Signed ~ Title Coil Tubinq Drilling Engineer Date Commission Use Only Permit Number IAPI number IApp~oval date See cover letter ~.../'~ _~ ]50- O 2_ ~' -..2, O 7 ? ~¢, _ L¢~ Oi ,,z2' (,~_ el ~ Ifor other requirements Conditions of approval Samples required [] Yes ,,~No Mud log required []Yes ~i~ No Hydrogen sulfide measures ,~ Yes [] No Directional survey requir ed ~. Yes [] No ApprovedRequired workingby pressure0rigI~a~9~'gEneo ~M;r []3M;V []5M; []10M; []15M; Other: David W. Johnston ~ ~ ,.~'/',A. by order of Commissioner the commission Date Submit in triplicate Form 10-401 Rev. 12-1-85 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: June 2, 1997 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Blair Wondzell Senior Petroleum Engineer ORIGINAL Re: Well A-26L1 Well A-26 is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The plan calls for a retrievable whipstock to be set in the 7" liner to permit drilling of a lateral into the Sag River formation. The open hole will be completed with a 2 7/8" slotted liner that will terminate just outside the window. The whipstock will then be pulled to provide access to lower Ivishak perforations. Existing perforations will not be squeezed. Ivishak perforations will be protected with carbolite and elevated LSRV FIoPro prior to setting the retrievable whipstock. The window will be milled through existing Sag R. perforations. The retrievable whipstock is not a sealing device and will permit production from below in the event that the whipstock cannot be retrieved. This procedure is described in the attached Form 401. Sincerely, Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center JUf~, 2 1997 Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: June 2, 1997 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Blair Wondzell Senior Petroleum Engineer Re: Coil Drilling Schedule Last week we submitted a form 401 for well R-16 to be sidetracked with coil on June 9. Because of complications in preparing well R-16 for sidetracking, we are now submitting an application to sidetrack weil A-26 prior to the sidetrack of R-16. The current coil sidetrack schedule is as follows: A-26L1 R-16L1 R-29A drilling expected to start June 11 (no abandonment) drilling expected to start June 25 (no abandonment) Perforation abandonment to start June 25, drilling July 9 I apologize for the changes in schedule and for the late submission of the A-26L1 form 401. Prep work for A-26L1 will begin on June 4 but will not involve abandonment of existing perforations. Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center JUN 2 1997 BPX A-26L1 Sidetrack Summary of Operations: Well A-26 is being sidetracked to provide improved drainage from the Sag River formation.. This sidetrack will be conducted in two phases. Phase 1: Prep well and set retrievable whipstock: Planned for June 4, 1997. - The existing Ivishak perforations will be covered with carbolite and protected with high LSRV FIoPro. - A retrievable whipstock will be set on ELine at approximately 10,410' MD. Phase 2: Drill & Complete Sidetrack: Planned for June 11, 1997. - RU coil drilling unit and mill window in Sag River interval. - Drill the directional hole as per attached plan to planned TD of 11,883' MD (8,675' TVDss). Mud Program: - Phase 1: Filtered seawater, Carbolite, FIoPro - Phase 2: FIo-Pro (8.8 - 8.9 ppg) Casing Program: - 2 7/8", 6.16#, L-80, FL-4S slotted liner will be run from TD to approx. 10,430' MD and termintaed outside the window. The slotted liner will not be tied into the existing liner. Well Control: - BOP diagram for drilling and completion is attached. - Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi. - The annular preventer will be tested to 400 psi and 2000 psi. Directional - See attachments. - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging - A Gamma Ray log will be run over all of the open hole section. -5,000 -4,500 A-26 -4,000 -3,500 X distance from Sfc Loc -3,000 4,500 4,000 3,500 3,000 o ,500 -2,50£ Well Name A-26 I CLOSURE Distance 5,785 ft I Az 313 deg I NEW HOLE E/VV (X) NIS (Y) Kick Off -3,327 3,141 TD -4,251 3,924 State Plane 649,444 5,951,815 Surface Loc 653,695 5,947,891 DLS de /100 Tool Face Length Curve 1 42 -20 149 Curve 2 12 -85 259 Curve 3 12 100 334 Curve 4 8 90 720 1,462 Drawn: Plan Name: A-26 8550 86OO 8650 DLI=z 8700 .._.8750 Vertical Section Path Distance (Feet) 500 1,000 1,500 2,000 deg/100 2,500 Angle @ K.O,= 35 deg MD:10421 TSAG TSHU 97 deg DL 2-- 12 deg/100 TSAD 3,000 11883 TD Tot Ddd:1462 ft Marker Depths ~Orig Wellbore TSAG 8,639 Ift TVD TSHU I 8,6651ft TVD 8,6701 8,670 ft TVD TSAD I 8,730 ft TVD Kick Off I 8,6501ft TVD I 10,4211ft MD Deprtr ~KO 4,590 ft MD KO Pt 10,421 MD New Hole 1462 Total MD 1~ TVD TD 8,675J Curve 1 Curve 2 Curve 3 Curve 4 DLS deg/100 42 12 Tool Face -20 -85 Length 149 259 100 334 90 720 1,462 Drawn: Plan Name: 6/2/97 9:59 Case 202 A-26L1 CT Drilling & Completion BOP LU 22.5" 2 3/8" CT --~ Lubricator~ 7 1/16" Annular 7 1/16" Pipe/Slip ~ 2 3/8" 17 1/16' x 5,000 psiI I ~s1/16 _., SWAB OR MASTER VALVE 06/02/97 'TREE: 4" CAMERON WELLHEAD: MCEVOY ACTUATOR: AXELSON A-26L~- Proposed Completion ~-~-r~B. ELEV = 87.69 BF. ELEV = 51.89 9-5/8" DV Packe~ 2598 13-3/8", 72 #/ft, I 2683 L-80, BTRS KOP: 2700 MAX ANGLE: 47 4-1/2", 12.6#/ft, 13 CHROME TUBING ID: 3.958" CAPACITY: .01522 BBL/FT SSSV LANDING NIPPLE 12,0741 CAMCO BAL-O 3.813 I.D GAS LIFT MANDRELS (OTIS WI RA LATCH) NO MD!BKB) 3068 5066 6580 8045 9810 9953 TVD~s 2979 J11' 4562 145' 5647 J40* 6781 145' 8157 139' 8269 137' WARNING: RADIO TRANSMITTER IN WEATHER MONITORING SHACK MUST BE TURNEB OFF BEFORE ANY WELL WORK INVOLVING EXPLOSIVES CAN BEGIN! CON TA C T PA D OPERA TOR. TOP OF BOTI 1 0148 I 7" LINER I 9-5/8", 47#/ft, I 10413 ! L-80, BTRS I I Top of Retrievable Whipstock approx. 10415' 4 1/2 .... SWS" NIPPLE (Parker) (3.813" ID) TUBING ANCHOR 9-5/8" PACKER, 9-Cr (TIW HP-BP)(4.00"ID) 10,099 10,110 1 110,1111 4 1/2", 12.6#/ft, 13-CR TAILPIPE 4 1/2 .... SWS" NIPPLEI (Parker) (3.813"1D). 10,161 4 1/2 .... SWN" NIPPLE J 1 0 1 82 (Parker) (3.725" ID)_ --, 4 112" WLEG 1 0,1 95 (ELMD) SIZE 3 3/8 3 3/8 3 ~/R 2 7/8 2 7/8 PERFORATION SUMMARY REF: LOG: CBL/GR 9/13/82 4 4 4 INTERVAL O 10413-10439 10520-10560 1~R20-1~R7~ 10574-10641 10651-10676 PEN/SQZ'D Open 1-31-96 OPEN 9110/91 SQZ SQZ SQZ 3.75" open hole with 2 7/8" slotted liner PBTD 7", 26#1ft, L-80, BTRS l 1 338 J WELL PERMIT CHECKLISToo. AN ADMINISTRATION 5 6 7 8 9. 10. ]1. 12. 13. INIT CLASS ENGINEERING Permit fee attached .................. Y Lease number appropriate ............... .- Y Y Unique well name and number ............... Well located in a defined pool ............. Y Well located proper distance from drlg unit boundary. . Well located proper distance from other wells ..... Sufficient acreage available in drilling unit ..... If deviated, is wellbore plat included ........ Operator only affected party ............. Operator has appropriate bond in force. ~ ...... Permit can be issued without conservation order .... Permit can be issued without administrative approval. Can permit be approved before 15-day wait ....... ___ WELL NAME F~/ /~--~ ~"'~"'~-. PROGRAM= expr~ dev~redrlO servO wellbore se~ann disp para req~ - ,_.. ...... .,~.~ / ' ~S ].4. 15. 16. 17. 18. 19. 20 21 22 23 24 25 26 27 28 29 Conductor string provided ................ Y N Surface casing protects all known USDWs ......... Y N CMT vol adequate to circulate on conductor & surf csg. . Y N ~ ' I CMT vol adequate to tie-in long string to surf csg . . . Y N J ~-- CMT will cover all known' productive horizons ...... '~N Casing designs adequate for C, T, B & permafrost .... Adequate tankage or reserve pit ............ If a re-drill, has a 10-403 for abndnmnt been approved. Adequate wellbore separation proposed .......... ~ N If diverter required, is it adequate .......... .~/~/~ Drilling fluid program schematic & equip list adequate '0 N BOPEs adequate ..................... ~ N BOPE press rating adequate; test to "~,~ psig. Choke manifold complies w/API RP-53 (May 84) ...... N Work will occur without operation shutdown ....... ~ N Is presence of H2S gas probable ............ Y~ N GEOLOGY Permit can be issued w/o hydrogen sulfide measures .... Y N/~ 31.30' Data presented on potential overpressure z°~es ..... 32. Seismic analysis of shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ ~/~ N 34. Contact name/phone for weekly progress reports . . ./. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: ~D~ ~r ~CAw'~ ! Comments/Instructions: HOW/dlf - A:\FORMS\cheklist rev 01197 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Wed Oct 08 09:33:56 1997 Reel Header Service name ............. LISTPE Date ..................... 97/10/08 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 97/10/08 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 AK-MW-70181 BUD JAHN STAGG/MELVIN A-26L1 PB1 500292079470 BP EXPLO~TION (~S~), INC. SPERRYLSUN DRILLING SERVICES 08-OCT-97 MWD RUN 3 AK-MW-70181 BUD JA/~N STAGG/MELVIN MWD RUN 5 AK-MW-70181 BUD JAHN STAGG/MELVIN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: P~d~GE: FNL: FSL: FEL: MWD RUN 6 AK-MW-70181 BUD JAHN SEVCIK/MELVI 35 lin 13E 2541 1703 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 87.70 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 9.625 10413.0 2ND STRING 7.000 11338.0 3RD STRING 4.500 10195.0 PRODUCTION STRING 3.750 11543.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL TRUE VERTICAL DEPTHS (TVD) ARE SUB SEA TRUE VERTICAL DEPTHS (SSTVD). 3. NO DATA WAS ABLE TO BE ACQUIRED ON MWD RUNS 1 AND 4. 4. MWD RUNS 2, 3, 5, AND 6 ARE DIRECTIONAL AND NATURAL GAMMA PROBE (NGP) UTILIZING SCINTILLATION DETECTOR. 5. THE GAMMA RAY DATA FOR MWD RUNS 2 AND 3 IS REAL TIME/PULSED ONLY. THE RECORDED DATA WAS CORRUPT AND UNRECOVERABLE. 6. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN D. DOUGLAS OF BP EXPLORATION (ALASKA), INC. AND A. TURKER OF SPERRY-SUN ON 09/30/97. 7. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11543'MD, 8653'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... ' Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Cormment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10400.0 11516.0 ROP 10428.0 11542.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 10420.0 10543.0 3 10543.0 11267.0 5 11267.0 11357.0 6 11357.0 11543.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD AAPI 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10400 11542.5 10971.2 2286 10400 GR 46.94 976.76 123.209 2233 10400 ROP 10.65 4068 59.993 2230 ' 10428 Last Reading 11542.5 11516 11542.5 First Reading For Entire File .......... 10400 Last Reading For Entire File ........... 11542.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUI~iARY VENDOR TOOL CODE START DEPTH GR 10400.0 ROP 10428.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 1O515.5 1O542.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: 20-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 10543.0 10420.0 10543.0 48.0 800.0 TOOL NUMBER · NGP 8 3.750 3.8 FLO-PRO 8.90 52.0 9.0 6.0 .000 .000 .000 .000 82.0 MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 AAPI 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10400 10542.5 10471.2 286 10400 GR 47.39 151.01 109.268 232 10400 ROP 12.66 66.35 37.0518 230 10428 Last Reading 10542.5 10515.5 10542.5 First Reading For Entire File .......... 10400 Last Reading For Entire File ........... 10542.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10510.5 ROP 10540.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11239.0 11267.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S) : MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 22-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 11267.0 10543.0 11267.0 89.0 95.8 TOOL NUMBER NGP 8 3.750 3.8 FLO-PRO 8.70 56.0 9.5 5.6 .000 .000 .000 .000 77.3 .3 REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 AAPI 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10510.5 11267.5 10889 1515 10510.5 GR 46.94 151.01 129.876 1458 10510.5 ROP 10.65 2047.73 59.6096 1456 10540 Last Reading 11267.5 11239 11267.5 First Reading For Entire File .......... 10510.5 Last Reading For Entire File ........... 11267.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE S UI~V~ARY VENDOR TOOL CODE START DEPTH GR 11241.5 ROP 11269.5 LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11330.0 11356.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GA/vsMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MIlD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMIq) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL M3kTRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 24-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 11357.0 11267.0 11357.0 90.6 94.7 TOOL NUMBER NGP 40 3.750 3.8 FLO- PRO 8.90 56.0 9.5 .000 ' .000 .000 .000 86.7 .3 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 AAPI 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11241.5 11356.5 11299 231 11241.5 GR 60.75 155.03 86.9197 178 11241.5 ROP 14.96 77.31 30.33 175 11269.5 Last Reading 11356.5 11330 11356.5 First Reading For Entire File .......... 11241.5 Last Reading For Entire File ........... 11356.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUI~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11312.0 11516.0 ROP 11339.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM A/gGLE: MAXIMUM ANGLE: 11542.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 25-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 11543.0 11357.0 11543.0 90.5 96.0 TOOL NUMBER NGP 4 0 3.750 3.8 FLO-PRO 9.00 56.0 9.0 4.8 .000 .000 .000 .000 82.4 .3 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 6 AAPI 4 1 68 ROP MWD 6 FT/H 4 1 68 Code Offset 0 4 8 Channel 1 2 3 Name Min Max Mean Nsam DEPT 11312 11542.5 11427.2 462 GR 51.24 976.76 119.638 409 ROP 15.3 4068 121.277 408 First Reading 11312 11312 11339 Last Reading 11542.5 11516 11542.5 First Reading For Entire File .......... 11312 Last Reading For Entire File ........... 11542.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/10/08 Origin ................... STS Tape Name ................ UNKNOWN · Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 97/10/08 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Wed Oct 08 09:43:13 1997 Reel Header Service name ............. LISTPE Date ..................... 97/10/08 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Technical Services Bate, ol- -ot Library. Scientific Tape Header Service name ............. LISTPE Date ..................... 97/10/08 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Technical Services Library. Scientific Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT ~D/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 AK-MW-70181 BUD JA/~N STAGG/MELVIN A-26L1 500292079460 BP EXPLO~TION (A~S~) , INC. SPERRYLSUN DRILLING SERVICES 08-OCT-97 MWD RUN 3 MWD RUN 7 AK-MW-70181 AK-MW-70181 BUD JAHN BUD JAHN STAGG/MELVIN SEVCIK/MELVI JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: PJdqGE: FNL: FSL: FEL: MWD RUN 8 MWD RUN 12 MWD RUN 13 AK-MW-70181 AK-MW-70181 AK-MW-70181 BUD JAHN BUD JAHN BUD JA_HN SEVCIK/MELVI SEVCIK/MELVI SEVCIK/MELVI 35 liN 13E 2541 1703 ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 87.70 .00 .00 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 10413.0 7.000 11338.0 4.500 10195.0 3.750 11703.0 File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL TRUE VERTICAL DEPTHS (TVD) ARE SUB SEA TRUE VERTICAL DEPTHS (SSTVD). 3. NO DATA WAS ABLE TO BE ACQUIRED ON MWD RUNS 1, 4, 9, 10, AND 11. 4. MWD RUNS 2, 3, 7, 8, 12, AND 13 ARE DIRECTIONAL AND NATURAL GAMMA PROBE (NGP) UTILIZING SCINTILLATION DETECTOR. 5. THE GAMMA RAY DATA ON MWD RUNS 2 AND 3 IS REAL TIME/PULSED ONLY. THE RECORDED GAMMA RAY DATA WAS CORRUPT AND UNRECOVERABLE. 6. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN D. DOUGLAS OF BP EXPLORATION (ALASKA), INC. AND SPERRY-SUN ON 09/30/97. 7. THIS WELL REACHED A TOTAL DEPTH (TD) OF llT03'MD, 8661'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUI~4ARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10400.0 11676.0 ROP 10428.0 11701.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 2 10420.0 10543.0 3 10543.0 10592.0 7 10592.0 10648.0 8 10648.0 10952.0 12 10952.0 11450.0 13 11450.0 11703.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD AAPI 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 · First , Name Min Max Mean Nsam Reading DEPT 10400 11701.5 11050.8 2604 10400 GR 47.39 957.58 170.248 2553 10400 ROP 1.48 944.49 54.0047 2548 10428 Last Reading 11701.5 11676 11701.5 First Reading For Entire File .......... 10400 Last Reading For Entire File ........... 11701.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10400.0 ROP 10428.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10515.5 10542.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S) : MUD PH: MUD CHLORIDES PPM) : FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: 20-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 10543.0 10420.0 10543.0 48.0 '800.0 TOOL NUMBER NGP 8 3.750 3.8 FLO-PRO 8.90 52.0 9.0 6.0 .000 .000 .000 82.0 MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 AAPI 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10400 10542.5 10471.2 286 10400 ROP 12.66 66.35 37.0518 230 10428 GR 47.39 151.01 109.268 232 10400 First Reading For Entire File .......... 10400 Last Reading For Entire File ........... 10542.5 Last Reading 10542.5 10542.5 10515.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10510.5 ROP 10540.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10591.5 10591.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S) : MUD PH: MUD CHLORIDES PPM) : FLUID LOSS (C3 : RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL I~TRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 22-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 11267.0 10543.0 11267.0 89.0 95.8 TOOL NUMBER NGP 8 3.750 3.8' FLO-PRO 8.70 56.0 9.5 5.6 .000 .000 .000 .000 77.3 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 3 FT/H 4 1 68 4 2 GR I~D 3 AAPI 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10510.5 10591.5 10551 163 10510.5 ROP 14.8 96.44 36.8182 104 10540 GR 122.11 151.01 150.337 163 10510.5 Last Reading 10591.5 10591.5 10591.5 First Reading For Entire File .......... 10510.5 Last Reading For Entire File ........... 10591.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL coDE START DEPTH GR 10564.5 ROP 10592.0 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: NuAXIMUM ANGLE: STOP DEPTH 10622.0 10648.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : M'UD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: I~UD FILTRATE AT MT: I~JD CAKE AT MT: NEUTRON TOOL NuXTRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: 27-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 10648.0 10592.0 10648.0 90.9 95.1 TOOL NUMBER NGP 40 3.750 3.8 FLO-PRO 9.10 58.0 8.5 6.2 .000 .000 .000 .000 77.3 .3 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 AAPI 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10564.5 10648 10606.2 168 10564.5 GR 126.44 410.86 226.862 116 10564.5 ROP 1.48 432 26.2061 113 10592 Last Reading 10648 10622 10648 First Reading For Entire File .......... 10564.5 Last Reading For Entire File ........... 10648 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10622.0 ROP 10649.5 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2.042, DR05 DATA TYPE (MEMORY OR REA_L-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED .(RPM) : HOLE INCLINATION (DEG MINIMUM .~GLE: MAXIMUM ANGLE: STOP DEPTH 10925.0 10951.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE BOREHOLE A/qD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMS4) AT TEMPERATURE (DEGFi ' MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet 28-JUN-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 10952.0 10648.0 10952.0 95.1 98.1 TOOL NUMBER NGP 40 3.750 3.8 FLO-PRO 9.20 63.0 9.5 6.8 · 000 .000 .000 ' .000 79.7 .3 Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 AAPI 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10622 10951.5 10786.8 660 10622 GR 90.6 861.61 251.978 607 10622 ROP 15.66 172.32 46.544 605 10649.5 Last Reading 10951.5 10925 10951.5 First Reading For Entire File .......... 10622 Last Reading For Entire File ........... 10951.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum PhysicaI Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW I~D Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 12 DEPTH INCREMENT: .5000 FILE SUI~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10896.5 11423.0 ROP 10924.0 11449.5 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 2. 042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 01-JUL-97 MSC 1.32 NGP 5.74, 6.61 DEP MEMORY 11450.0 10952.0 11450.0 85.2 95.3 TOOL NUMBER NGP 40 3.750 3.8 FLO- PRO 8.90 65.0 9.0 5.2 .000 .000 .000 .000 79.7 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 12 AAPI 4 1 68 4 2 ROP I~D 12 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10896.5 11449.5 11173 1107 10896.5 GR 56.31 957.58 175.586 1054 10896.5 ROP 9.8 167.65 53.217 1052 10924 Last Reading 11449.5 11423 11449.5 First Reading For Entire File .......... 10896.5 Last Reading For Entire File ........... 11449.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW I~$D Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 10917.5 11701.5 GR 11419.0 11676.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 02-JUL-97 MSC 1.32 NGP 5.74, 6.61 DEP 2. 042, DR05 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY S) : MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MEMORY 11703.0 11450.0 11703.0 84.9 89.0 TOOL NUMBER NGP 282 3.750 3.8 FLO-PRO 8.90 65.0 9.0 5.6 .000 .000 .000 .000 84.4 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR ~D 13 AAPI 4 1 68 4 2 ROP ~D 13 FT/H 4 1 68 8 3 Name Min Max Mean Nsam DEPT 10917.5 11701.5 11309.5 1569 GR 74.59 113.5 85.0478 515 ROP 37.38 1009.32 93.2759 574 First Reading 10917.5 11419 10917.5 Last Reading 11701.5 11676 11701.5 First Reading For Entire File .......... 10917.5 Last Reading For Entire File ........... 11701.5 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Versien Number ........... 1.0.0 Date of Generation ....... 97/10/08 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/10/08 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 97/10/08 ' Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File