Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-139MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Monday, May 5, 2025
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Guy Cook
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
W-03A
PRUDHOE BAY UNIT W-03A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 05/05/2025
W-03A
50-029-21953-01-00
197-139-0
W
SPT
8603
1971390 2151
826
184
4YRTST F
Guy Cook
4/8/2025
While pressuring up to the required test pressure fluid starting coming out of the conductor into the cellar of the well. At the time the fluid was
noticed flowing into the cellar the pressures were at 830 psi. tubing, 1700 psi IA and 330 psi. OA. The test was stopped and pressure was bled
off. The fluid continued to bubble out of the conductor for over an hour while I was on location, but appeared to slow over time. The well would
be shut in and freeze protected and then diagnostic testing would be done to confirm where the breaches are.
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT W-03A
Inspection Date:
Tubing
OA
Packer Depth
446IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitGDC250408065702
BBL Pumped:BBL Returned:
Monday, May 5, 2025 Page 1 of 1
9
9
9 9
9
9
9
9
9
3KRWRDWWDFKHG
While pressuring up to the required test pressure fluid starting coming out of the conductor into the cellar of the well
James B. Regg Digitally signed by James B. Regg
Date: 2025.05.05 09:03:14 -08'00'
PBU W-03A (PTD 1971390)
Fluid from Conductor During MIT
AOGCC Insp Rpt # mitGDC250408065702
Photo by AOGCC Inspector G. Cook
4/8/2025
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: NOT OPERABLE: Injector W-03A (PTD #1971390) surface casing leak
Date:Wednesday, April 30, 2025 7:52:47 AM
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Wednesday, April 30, 2025 5:54 AM
To: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>; Wallace, Chris D (OGC)
<chris.wallace@alaska.gov>
Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>;
Torin Roschinger <Torin.Roschinger@hilcorp.com>
Subject: NOT OPERABLE: Injector W-03A (PTD #1971390) surface casing leak
Mr. Wallace,
WAG Injector W-03A (PTD #1971390) AOGCC MIT-IA was cancelled when active bubbling in the
conductor was observed on 04/08. An OA integrity with nitrogen failed on 04/11 and a non
witnessed offline MIT-IA passed ton 04/14. DHD is still in progress with removing frozen casing filler
and gravel from the conductor to establish a leak depth on the surface casing. The well is now
classified as NOT OPERABLEB and will remain shut in until the surface casing leak is resolved.
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659-5102
M: (907) 232-1005
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Tuesday, April 8, 2025 4:55 PM
To: chris.wallace@alaska.gov
Cc: jim.regg <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Torin
Roschinger <Torin.Roschinger@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Injector W-03A (PTD #1971390) possible surface casing leak
Mr. Wallace,
WAG Injector W-03A (PTD #1971390) was scheduled for an AOGCC witnessed MIT-IA today. While
bringing the IA up to test pressure, there was active bubbling and fluid rising in the conductor. The
pressures were bled off and the test was cancelled. The well has been shut in and freeze protected.
It will now be classified as UNDER EVALUATION and is on the 28-day clock for diagnostics.
1. DHD: OA integrity test w/N2
2. Well Integrity: Additional diagnostics as needed
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307)399-3816
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: UNDER EVALUATION: Injector W-03A (PTD #1971390) possible surface casing leak
Date:Wednesday, April 9, 2025 8:17:42 AM
Attachments:W-03A.pdf
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Tuesday, April 8, 2025 4:55 PM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>
Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>;
Torin Roschinger <Torin.Roschinger@hilcorp.com>; PB Wells Integrity
<PBWellsIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Injector W-03A (PTD #1971390) possible surface casing leak
Mr. Wallace,
WAG Injector W-03A (PTD #1971390) was scheduled for an AOGCC witnessed MIT-IA today. While
bringing the IA up to test pressure, there was active bubbling and fluid rising in the conductor. The
pressures were bled off and the test was cancelled. The well has been shut in and freeze protected.
It will now be classified as UNDER EVALUATION and is on the 28-day clock for diagnostics.
1. DHD: OA integrity test w/N2
2. Well Integrity: Additional diagnostics as needed
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307)399-3816
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
TREE= 4-1/8" CAME20N
WELLHEAD=
FMC
ACTUATOR=
KB. ELEV =
AXE -SON
63.47
BF. E-EV =
29.15'
KOP=
3918'
Max Angle =
62' @ 5566'
Datum MD =
12359'
Datum ND=
88001SS
13-3/8" CSG, 72#, L-80, D = 12.347" 2701' —
Minimum ID = 3.725" @ 12091'
4-1/2" HES XN NIPPLE
TOPOF7"LNR 459V
TOP OF CEMENT 462W
I-12" TBG, 12.6#, L-80, 4811'
DS, 0.0152 bpf, D = 3.958"
OF 4-12- TBG MOD - BUTT 4811'
W-03A
PERFORATION SUMMARY
REF LOG: BHrJGR ON 08/11/97
ANGLEAT TOP PERF: 28" Q 12415'
Note: Refer to Production DB for historical perf data
SEE
SPF
INTERVAL
Opn/Sgz
DATE
277/8"
6
12415 - 12458
O
OZ/OB/98
2-718"
6
12458 - 12468
S
L
0124/98
¢sv 5000'
TOP OF CEMENT �05�
FLL 9815' -
PBTD 9903'
II 5-12" LNR, 17#, L-80, .0232 bpf, ID = 4.892" 1--1 9980-
R
SAFETY NOTES: H2S READINGS AVERAGE 125 ppm
WHEN ON MI. WELL REQUIRES A SSSV WHEN ON
ML WILES WAS ACTUALLY SPACED OUT T INTO
TIEBACK SLEEVE
209V 4-1/2" HES HXO SSSV NIP, D = 3.813"
GAS LIFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
4
3336
3253
0
CA-MG-2LS
BTM
3
6380
5513
62
CA-KBG-2LS
BTM
2
9873
7245
59
CA-KBG-2LS
BTM
1
11968
8451
30
CA-KBG-2LS
BTM
4591" H 9-5/8- X 7" ZXP PKR
MLLOITT VNNDOW
4799' - 4844'
12035' 4-12' HES X NP, D = 3.813'
1204T 7" X 4-1/2" BKR S-3 PKR, D = 3.875"
12091' H 4-12" HES XN NIP, ID = 3.725"
12103' 4-1/2"1NLEG
\ 12113' ELMD TT LOGGED 02/07/95
TOP OF 7" LNR — 1116W \
7- LNR 26#, MOD -BUTT, 11150'
.0383 bpf, ID = 6276"
DATE
REV BY
COMMENTS
DATE
REV BY
COMMENTS
1989
ORIGINAL COMPLETION
01/19/12
TMN/JMD
ADDED H2S SAFETY NOTE
08/15/97
CHH
SIDETRACKINABORS18E
02/06/01
SIS-QAA
CONVERTED TO CANVAS
03/05/01
SIS-LG
FINAL
1020/02
PP/KAK
PERF CORRECTIONS
02/16/11
MB/JMD
ADDED SSSV SAFETY NOTE
I 12124' I
15-1/2" X 4-12" XO II
PBTD H 12663'
4-12" LNR 12.6#, L-80,
IBT MOD, .0152 bpf, ID = 3.953"
I 1275W I
PRUDHOE BAY UNIT
WELL: W-03A
PERMIT No: 1971390
API No: 50-029-21953-01
Hilcorp North Slope, LLC
HiLYIO
m plaa
Tubing
—pu
• &eM
k OpxeNe
} Nat 0',
♦ Uwer E"I
an. IA
—� Men. OA
Men. MA
♦ Men. 000P
O Man. mN
MEMORANDUM
TO: Jim Regg q
P.1.9upervisor
FROM: Austin McLeod
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, April 26, 2021
SUBJECT: Mechanical Integrity Tests
Hilcorp North Slope, LLC
W -03A
PRUDHOE BAY UNIT W -03A
Sm: Inspector
Reviewed By:
P.I. Supry JEP--
Comm
Well Name PRUDHOE BAY UNIT W -03A API Well Number 50-029-21953-01-00
Inspector Name: Austin McLeod
Permit Number: 197-139-0
Inspection Date: 4/13/2021 -
InSp Num: mitSAM210415164327
Rel Insp Num:
Packer Depth Pretest Initial
15 Min 30 Min 45 Min 60 Min
Well
W -03A
Type Inj
W-
TVD
8603Tubing
965 -
965
965 -
965
PTD
1971390
Type Test
SPT'
Test psi
2151 IA
Els
2398
2332
2315 -
BBL Pumped: 1
4.3 BBL Returned:
3.8 _ OA
o
0
0
0
Interval 4YRTST P/F P
Notes: MIT -IA
Monday, April 26, 2021 Page I of I
• 0
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE: Friday,April 14,2017
P.I.Supervisor \ SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC.
\`A^1 W-03A
FROM: Brian Bixby W PRUDHOE BAY UNIT W-03A
Petroleum Inspector
Src: Inspector
Reviewed B,y:, `
. P.I.Supry VAS
IL
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UNIT W-03A API Well Number 50-029-21953-01-00 Inspector Name: Brian Bixby
Permit Number: 197-139-0 Inspection Date: 4/12/2017
Insp Num: mitBDB170412145150
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well W-03A Type Inj W TVD 11 8603 Tubing 659 660 674 661 652 1
PTD 1971390 Type Test SPT Test psil 2151 '_- IA 407 2387 2311 2291 2283/'
BBL Pumped: 1 —9.7 BBL Returned: 1 6.1 OA 72 223 224 226 226
Interval 4YRTST P/F 1 P
Notes:
tAtIEp ,i 1 r; 0 1'
Friday,April 14,2017 Page 1 of 1
Monthly Injection Report for GPBoPMA, Northstar, Milne Point & Endicor August... Page 1 of 1
Maunder, Thomas E (DOA)
From: AK, D &C Well Integrity Coordinator [ AKDCWellIntegrityCoordinator @bp.com]
Sent: Saturday, September 03, 2011 4:20 PM
To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); Brooks, Phoebe L (DOA);
AK, D &C Well Integrity Coordinator
Cc: AK, OPS GC1 OSM; AK, OPS FS1 OSM; AK, OPS Area Mgr North (Gas Plants GPMA); AK, OPS GC2
OSM; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, OPS FS2 DS Ops Lead; AK, OPS
FS2 Facility OTL; AK, OPS FS3 DS Ops Lead; AK, OPS FS3 Facility OTL; AK, OPS GC1 Facility OTL;
AK, OPS GC1 Wellpad Lead; AK, OPS GC2 Facility OTL; AK, OPS GC2 Wellpad Lead; AK, OPS GC3
Facility & Field OTL; AK, OPS GC3 Wellpad Lead; AK, OPS GPMA Facility OTL; AK, OPS LPC DS Ops
Lead; AK, OPS Ops Supt; Kurz, John; AK, OPS MPU OSM; AK, OPS MPU Field Lead Tech; AK, OPS
MPU Field Ops TL; AK, OPS MPU Well Ops Coord; AK, OPS MPU Wells Ops Coord 2; AK, OPS Nstar
Lead Tech; AK, OPS Nstar OIM; AK, OPS Nstar O &M TL; Nash, Justin; Daniel, Ryan; AK, RES END
Production Optimization Engineer
Subject: Monthly Injection Report for GPB, GPMA, Northstar, Milne Point & Endicott for August 2011
Attachments: AOGCC Inj Report 09- 11.zip
Tom, Jim, Phoebe, and Guy,
Attached is the August 2011 Injection Report for GPB, GPMA, Northstar, Milne Point and Endicott injectors operating under a
Sundry or Administrative Approval.
« AOGCC lnj Report 09- 11.zip»
Notes on wells:
Added to Report:
None
Taken off Report:
09 -36C (PTD #1951140): Reclassified as Not Operable and added to Quarterly Not Operable Report after LDL identified
patch leaking.
R -02 (PTD #1781000): Reclassified as Not Operable and added to Quarterly Not Operable Report after MIT -IA failed.
L -119 (PTD #2020640): Finished monitoring for 2 additional months after being Under Evaluation in May, 2011 No
repressurization noted.
L -210 (PTD #2031990): Finished monitoring for 2 additional months after being Under Evaluation in May, 2011 No
repressurization noted.
-03 (PTD #1971390): onitored for IA repressurization reported February, 2011. No repressurization noted.
Please call with any questions or concerns.
Thank you,
Gerald Murphy (alt. Mehreen Vazir)
Well Integrity Coordinator
Office (907) 659 -5102
Cell (907) 752 -0755
Pager (907) 659 -5100 Ext. 1154
9/6/2011
Monthly Injection Report for GPEOPMA, Northstar, Milne Point & Endie for Februa... Page 1 of 2
Maunder, Thomas E (DOA)
From: AK, D &Cell Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @ bp.com]
Sent: Monday, March 07, 2011 9:26 AM
To: Maunder, Thomas E (DOA); Brooks, Phoebe L (DOA)
Cc: AK, D &C Well Integrity Coordinator; Regg, James B (DOA); Schwartz, Guy L (DOA)
Subject: RE: Monthly Injection Report for GPB, GPMA, Northstar, Milne Point & Endicott for February
2011
Attachments: AOGCC Inj Report 03- 11.zip
Tom,
There was a bug in the initial Monthly Injection Report that didn't identify all the wells. The bug has been fixed;
please use this report for your records.
Notes on wells:
dded to Report: I C.'1
W -03A: Added to report due to sustained casing pressure on the IA noted 2/17/11, currently performing
diagnostics.
AGI -05: Added to report due to IA repressurization post TAPS shutdown.
Taken off Report:
S -101: Taken off report due to a failing MITIA. Added to the Quarterly Not Operable Report.
Thank you,
Torin Roschinger (alt. Jerry Murphy) ,[}
Well Integrity Coordinator
il
Office (907) 659 -5102
Harmony Radio x2376
Cell (406) 570 -9630
Pager (907) 659 -5100 Ext. 1154
From: Maunder, Thomas E (DOA) [mailto:tom.maunder @alaska.gov]
Sent: Monday, March 07, 2011 9:09 AM
To: AK, D &C Well Integrity Coordinator
Subject: RE: Monthly Injection Report for GPB, GPMA, Northstar, Milne Point & Endicott for February 2011
Torin,
I have just started to review the list. In the message, you list W -03 as being added. Should that be W -03A?
Also, when I look at the spreadsheet I do not find W -03 or W -03A included.
Could you check into this ??
Thanks in advance,
Tom Maunder, PE
AOGCC
From: AK, D &C Well Integrity Coordinator [mailto: AKDCWeIIIntegrityCoordinator @bp.com]
Sent: Sunday, March 06, 2011 11:59 AM
To: AK, D &C Well Integrity Coordinator; Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L
3/7/2011
Monthly Injection Report for GPB PMA, Northstar, Milne Point & Endico for Februa... Page 2 of 2
(DOA); Brooks, Phoebe L (DOA)
Cc: AK, OPS GC1 OSM; AK, OPS FS1 OSM; AK, OPS Area Mgr North (Gas Plants GPMA); AK, OPS GC2 OSM; AK,
OPS FS1 DS Ops Lead; AK, OPS FS1 Facility OTL; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS
FS3 DS Ops Lead; AK, OPS FS3 Facility OTL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS GC2
Facility OTL; AK, OPS GC2 Wellpad Lead; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; AK, OPS
GPMA Facility OTL; AK, OPS LPC DS Ops Lead; AK, OPS Ops Supt; Kurz, John; AK, OPS MPU OSM; AK, OPS MPU
Field Lead Tech; AK, OPS MPU Field Ops TL; AK, OPS MPU Well Ops Coord; AK, OPS MPU Wells Ops Coord 2; AK,
OPS Nstar Lead Tech; AK, OPS Nstar OIM; AK, OPS Nstar O &M TL; Nash, Justin; Daniel, Ryan; AK, RES END
Production Optimization Engineer; Engel, Harry R
Subject: Monthly Injection Report for GPB, GPMA, Northstar, Milne Point & Endicott for February 2011
Tom, Jim, Phoebe, and Guy,
Attached is the February 2011 Injection Report for GPB, GPMA, Northstar, Milne Point and Endicott injectors
operating under a Sundry or Administrative Approval.
«AOGCC Inj Report 03- 11.zip»
Notes on wells:
Added to Report:
W -03: Added to report due to sustained casing pressure on the IA noted 2/17/11, currently performing
diagnostics.
AGI -05: Added to report due to IA repressurization post TAPS shutdown.
Taken off Report:
S -101: Taken off report due to a failing MITIA. Added to the Quarterly Not Operable Report.
Please call with any questions or concerns.
Thank you,
Torin Roschinger (alt. Jerry Murphy)
Well Integrity Coordinator
Office (907) 659 -5102
Harmony Radio x2376
Cell (406) 570 -9630
Pager (907) 659 -5100 Ext. 1154
3/7/2011
Well W -03A Injection Plot
Pressure vs. Rate TIO Plot Sustained casing pressure on
g O the IA reported to AOGCC
o O
q 2/17.
v Tbg
IA
o ♦ o - OA Currently monitoring IA
M ♦ • �•t�• • o ° ` I I ,,,,IL,_ repressurization.
N
n °o • n o i
ci: = o ► a N /-
N
O p
1
1 \ .
• Last 90 days • Last Month l' "vr r ,
0
0 2,000 4,000 6,000 8,000 10,000 12,000 9 /8/10 11/29/10 2/19/11 5/12/11
Injection Rate, MCFPD
Volume Injected Tubing Pressure Tbg Press IA Press OA Press
Date (BWPD / MCFPD) (psi) WHP Date (psi) (psi) (psi)
03/01/11 5,619 2,619 03/01/11 2,610 500 0
02/28/11 5,605 2,623 02/28/11 2,610 500 0
02/27/11 5,970 2,638 02/27/11 2,610 500 0
02/26/11 2,773 2,145 02/23/11 2,700 1,400 120
02/25/11 3,624 2,413 02/22/11 2,700 1,300 80
02/24/11 3,780 2,421 02/21/11 2,700 1,340 100
02/23/11 5,218 2,588 02/20/11 2,700 1,240 40
02/22/11 5,784 2,641 02/19/11 2,700 1,020 40
02/21/11 5,835 2,651 02/18/11 3,000 320 40
02/20/11 5,725 2,632 02/17/11 2,700 2,140 120
02/19/11 5,716 2,659 02/16/11 2,700 1,800 40
02/18/11 620 2,604 02/15/11 2,750 1,940 100
02/17/11 4,994 2,677 02/13/11 2,750 1,900 100
02/16/11 6,081 2,668 02/12/11 2,650 1,600 40
02/15/11 6,275 2,685 02/11/11 2,650 1,640 40
02/14/11 6,330 2,689 02/10/11 2,650 1,500 40
02/13/11 6,369 2,689 02/09/11 2,650 1,680 50
02/12/11 5,708 2,621 02/08/11 2,700 1,640 50
02/11/11 5,609 2,615 02/07/11 2,800 1,700 50
02/10/11 5,495 2,584 02/06/11 2,750 1,800 50
02/09/11 5,390 2,583 02/05/11 2,700 1,760 50
02/08/11 5,430 2,589 02/04/11 2,800 1,700 50
02/07/11 6,314 2,672 02/03/11 2,800 1,700 50
02/06/11 6,380 2,680 02/02/11 2,200 1,620 50
02/05/11 5,843 2,602 02/01/11 2,200 1,560 50
02/04/11 6,097 2,643 01/31/11 2,200 1,380 100
02/03/11 6,475 2,673 01/30/11 2,800 520 0
02/02/11 6,022 2,641 01/29/11 3,200 400 0
02/01/11 5,988 2,624 01/28/11 750 400 0
01/31/11 6,080 2,601 01/27/11 750 400 0
01/30/11 2,820 2,815 01/26/11 750 400 0
Well W -03A Injection Plot
TIO Plot Sustained casing pressure on
o Pressure vs. Rate o the IA reported to AOGCC
0
v Tbg 2/17.
- IA
o ♦ o - OA Currently monitoring IA
o - \'\/ I repressurization.
o oi • • Vc H
CL C>
> N ■ =
o°o _ 0 1 11\1 -- f\-
I • Last 90 days • Last Month '
o ♦ 1 o -.
0 2,000 4,000 6,000 8,000 10,000 12,000 9/8/10 11/29/10 2/19/11 5/12/11
Injection Rate, MCFPD
Volume Injected Tubing Pressure Tbg Press IA Press OA Press
Date (BWPD I MCFPD) (psi) WHP Date (psi) (psi) (psi)
03/01/11 5,619 2,619 03/01/11 2,610 500 0
02/28/11 5,605 2,623 02/28/11 2,610 500 0
02/27/11 5,970 2,638 02/27/11 2,610 500 0
• 02/26/11 2,773 2,145 02/23/11 2,700 1 ,400 120
02/25/11 3,624 2,413 02/22/11 2,700 1,300 80
02/24/11 3,780 2,421 02/21/11 2,700 1,340 100
02/23/11 5,218 2,588 02/20/11 2,700 1,240 40
02/22/11 5,784 2,641 02/19/11 2,700 1,020 40
02/21/11 5,835 2,651 02/18/11 3,000 320 40
02/20/11 5,725 2,632 02/17/11 2,700 2,140 120
02/19/11 5,716 2,659 02/16/11 2,700 1,800 40
02/18/11 620 2,604 02/15/11 2,750 1,940 100
02/17/11 4,994 2,677 02/13/11 2,750 1,900 100
02/16/11 6,081 2,668 02/12/11 2,650 1,600 40
02/15/11 6,275 2,685 02/11/11 2,650 1,640 40
02/14/11 6,330 2,689 02/10/11 2,650 1,500 40
02/13/11 6,369 2,689 02/09/11 2,650 1,680 50
02/12/11 5,708 2,621 02/08/11 2,700 1,640 50
02/11/11 5,609 2,615 02/07/11 2,800 1,700 50
UNDER EVALUATION: InjectorS03A (PTD #1971390) Sustained IA Pure Abov... Page 1 of 1
Maunder, Thomas E (DOA)
From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com]
Sent: Thursday, February 17, 2011 9:32 PM
To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2
OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad SW;
AK, OPS Prod Controllers; Cismoski, Doug A; Engel, Harry R; AK, D &C Wireline Operations
Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt
Engr; AK, RES GPB East Wells Opt Engr
Cc: AK, D &C Well Integrity Coordinator
Subject: UNDER EVALUATION: Injector W -03A (PTD #1971390) Sustained IA Pressure Above
I'I MOASP
Attachments: W -03A (PTD #1971390) TIO and Injection Plot.doc; W -03A (PTD #1971390) wellbore
schematic.pdf
All,t1�x `1n
WAG injector W -03A (PTD #1971390), currently on M -I injection, had confirmed IAP above MOASP. The
wellhead pressures were tubing /IA/OA equal to 2700/2140/120 on 02/17/2011. The well has been reclassified as
Under Evaluation. The well shall cease injection as soon as safely possible to begin diagnostics.
Plan forward:
1. D: MIT -IA to 4000 psi while offline
2. WIC: Pending passing MIT -IA, notify AOGCC for permission to resume injection of M -I
3. D: MIT -IA to 4000 psi with well on injection
4. WIE: Monitor well for 10 days for IA pressure stabilization
5. WIE: If MIT -IA fails, develop procedure for leak detect log
A TIO plot and wellbore schematic have been included for review.
«W -03A (PTD #1971390) TIO and Injection Plot.doc» «W -03A (PTD #1971390) wellbore schematic.pdf»
Please call if you have questions or concerns.
Thank you,
Gerald Murphy (alt. Torin Roschinger)
Well Integrity Coordinator
Office (907) 659 -5102
Cell (907) 752 -0755
Pager (907) 659 -5100 Ext. 1154
2/18/2011
• •
W -03A (PTD #1971390) TIO Plot
Wek W -03
4,000
3.000 •
T6p
—a— LA
ODA
•
• 000
-- OOOA
On
•
•
•
•
•
12/18/10 12/25/10 01/01/11 01/08/11 01 /15/11 01/22/11 01/25/11 02/05/11 02/12/11
W -03A (PTD #1971390) Injection Plot
W.! W-03
•
3200 '- 9000
3,000 A 0500
2.800 8.000 •
2,600 7,500
7,000 •
2,400 6.500 •
2.000 l^
/' " 6,000
2.000 5 - WHIP
1.800 5.000 SW
1.600 4,509
1,400 4.000 — OIL
1 3.500 o
1.000 3.000
2,500
800 2.000
600 1,500
400 1,000
200 500 '..
•
12/18/10 12/25/10 01/01/11 01 /00/11 01/15/11 01 /22/11 01/29/11 02/05/11 02/12/11
State of Alaska
MEMORANDUM
A-asl;a oil and Gas Conservation Commission
llATE: Wednesday, April 15, 2009
To: Jim Regg ~ r
P.I. Supervisor ' P% 2 ~i 1 ~(Zt3v`~ SUB.TIsC'T: Ma~:hanical Integrity "C~ts
( I3P FXPLORI'rrON lA]. ASKA) INC
~l'-U3A
PROM: Bob Noble ~~ritn.~xos snY uw•r w-~)sa
Petroleum Inspector
Src: Inspector
,.r~-nr rntvFiT1F'1VTiA1.
Reviewed By:
I'.I. Suprv
Comm
Well Name: PRUDHOE B:1Y UNIT W-o3A
Insp Num: mitRCN090413052850
Rel Insp Num:
Packer
--
_ r- -
Well ~w osAType InI I ~~' TVD
- -- _
P T 19713~'.1TYPeTest~ sPT Test ps
_ _. orxrx P/F - - P
Interval___-- _------
Notes: MI"f-IA to 4000 psi for MI swap
APi Well Number: 50-029-21953-01-00 Inspector Name: Bob':vobl~
Permit Number: 1`»-139-0 ~ Inspection Date: a.%1o`2009
Depth Pretest Initial 15 Min. 30 Min 45 Mm= 60 Min..
b693 ~ ~ ~ j G7~) ~ ~UJ20 ~~ >`~p ~ ~ ~,
_.
_I ~ - - ~_ _
-- -
~~~~ oA ~,~, 1 ~3~
~ - i _ _ -.
__ _
_ --- - -
--- }
~ Tubing i ~~' ~ nx' ~~' 7rxi
I I _ -- ---
!'
Page 1 of 1
Wednesday, April 15, 2009
.
.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
R~1 11(30/00
DATE: Monday, November 27,2006
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
W-03A
:::DH~~:::o:"HW-OJA k~
\ ., '0 ?J~ :.~~~:;~ B~~
NON-CONFIDENTIAL V\I ' Comm
FROM:
Chuck Scheve
Petroleum Inspector
Permit Number:
]97-139-0
Inspector Name: Chuck Scheve
Inspection Date: 11119/2006
Well Name: PRUDHOE BAY UNIT W-03A
Insp Num: mitCS061120093616
ReI Insp Num
API Well Number 50-029-21953-01-00
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
---.-- --r---------------,.---~-------~--¡-~-! ~---
Well: W-03A ¡Type Inj. w. TVD . 8603 . IA ¡ 250 i 2410 . 2400 ' 2390 ! 2385 I
~_. I --~.--~-_t_____--.--~.'--------------+-...~~.----~.-.----~----__+_-- _.------;-__._-L__~~~
P.T. : 1971390 iTypeTest¡SPT~~215075_~A I 0 _L~~~~_ 0 I 0 '__
Interval 4YRTST PIF p.// Tubing i 600 600 600 600: 600
~- -~------
Notes
rì~
Monday, November 27, 2006
Page I of I
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_
CONVERSION - WAG INJECTOR Pu, tubing_
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
1227' FNL, 1190' FEL, Sec. 21, T11N, R12E, UM
At top of productive interval
3671' FNL, 421' FEL, Sec. 22, T11N, R12E, UM
At effective depth
3724' FNL, 303' FEL, Sec. 22, T11N, R12E, UM
At total depth
3744' FNL, 259' FEL, Sec. 22, T11N, R12E, UM
Stimulate _ Plugging _ Perforate _
Alter casing _ Repair well _ Other_X CONVERSION
5. Type of Well:
Development __
Explorato~__
Stratigraphic__
Service__X
(asp's 612049, 5959030)
(asp's 618140, 5956679)
(asp's 618258, 5956627)
(asp's 618303, 5956608)
6. Datum elevation (DF or KB feet)
RKB 83 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
W -03A
9. Permit number / approval number
'~ 197-139 / 302-222
10. APl number
50-029-21953-01
11. Field / Pool
Prudhoe Bay Field / Prudhoe Bay Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 100'
Surface 2647'
Intermediate 4745'
Liner 7674'
Sidetrack Liner 647'
12750 feet Plugs (measured)
9217 feet
12664 feet Junk (measured)
9146 feet
Size Cemented Measured Depth True Vertical Depth
20" 72 c.f. 154' 154'
13-3/8" 3840 cf Cold Set I & II 2701' 2701'
9-5/8" 1984 cf Class 'G' 4799' 4736'
7" 1523 cf Class 'G' 4591' - 12265' 4551'- 8798'
4-1/2" x 5-1/2" 152 cf Class 'G' 12103' - 12750' 8653'- 9217'
Perforation depth:
Tubing (size, grade, and measured depth)
Packers & SSSV (type & measured depth)
measured Open Perfs 12415'-12455', Sqzd Peris 12455'-12488'
R .C[]VFD
true vertical Open Peris 8932'-8970', Sqzd Peris 8970'-8979'
4-1/2", 12.6#, L-80 Tubing @ 12047' MD. Tubing Tail @ 12103'. ~';~;~ ~'~ ~' 2003
Alaska 0ii & .~t,¥ :~'0~?~. ~,b;iipaiSSl0t~
7"x 4-1/2" Baker S-3 Packer @ 12047' MD. Ap, cho,'.-~ge
4-1/2" HES HXO SSSV Landing Nipple @ 2091' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation 11/25/2002
Subsequent to operation 02/11/2003
OiI-Bbl
Representative Daily Averaqe Production or Iniection Data
Gas-Mcf Water-Bbl
1257
12464
Casing Pressure
Tubing Pressure
1171
3414
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations _
16. Status of well classification as:
Oil __ Gas _ Suspended _
Service WAG INJECTOR
17. I hereby certihJ that the foregoing is true and correct to the best of my knowled~je.
DeWayne R Schnorr
Form 10-404 Rev 06/15/88 ·
FE'8 26
Date February 20, 2003
Prepared by DeWayne R Schnorr 564-5174
2OO3 ~
SUBMIT IN DUPLICATE
10/1 O/2OO2
10/1 O/2O02
10/17/2002
I 0/18/2OO2
10/19/2002
1 O/20/2002
11/19/2OO2
11/20/2002
11/21/2002
12/28/2OO2
01/02/2003
01/17/2003
01/18/2OO3
01/19/2003
10/10/02
10/10/02
10/17/02
10/18/O2
10/19/02
10/20/O2
11/19/O2
11/20/02
11/21/02
W-03A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
SECURE WELL: AC-MONITOR
SECURE WELL: AC-BLEED
ANN-COMM (UTC PROGRAM): AC-FLUID LEVEL
ANN-COMM (UIC PROGRAM): AC-FLUID LEVEL
ANN-COMM (UIC
ANN-COMM (UTC
ANN-COMM (UIC PROGRAM): AC-FLUTD
ANN-COMM (UIC PROGRAM): AC-EVAL;
ANN-COMM (UIC PROGRAM): AC-MITIA
ANN-COMM (UTC PROGRAM): SSSV C/O OR STROKE
FIRST DAY OF MI GAS INJECTION.
SCMOO-B-GONE--SBG: SCMOO-B-GONE
SCMOO-B-GONE--SBG: SCMOO-B-GONE
TESTEVENT--- INJECTION PRESSURE, PST: 3588 PSI,
VOLUME: 14,687 SCFPD.
PROGRAM): AC-MITIA
PROGRAM): AC-MONITOR
LEVEL
AC-FLUID LEVEL
TYPE: MI
EVENT SUMMARY
TIO= 1020/220/260 MONITOR WHP's. POST IA BLEED.
TIO=1100/980/350. TEMP = 112. (PREP FOR MITIA). INITIAL IA FL NEAR
SURFACE. BLED IA FROM 980 PSI TO 200 PSI IN ONE HOUR AND 15 MINUTES.,
MONITOR FOR 30 MINUTES. lAP INCREASED 20 PSI. FINAL WHP's =
1100/200/300.
T/I/O= 1300/500/520 ( FOR STATE MIT's) IA FL @ SURFACE.
T/I/O = 1500/540/320 TEMP = 113 IA FL @ SURFACE. (PREP FOR AOGCC MITIA).
MITIA PASSED TO 2180 PSI. (WITNESSED BY CHUCK SCHEVE OF THE
AOGCC). PRESSURED UP ON IA FROM AN INITIAL 400 PSI TO 2180 PSI.
STARTED TEST. AFTER 15 MINUTES THE IA PRESSURE WAS AT 2140 PSI AND
AFTER 30 MINUTES THE PRESSURE WAS AT 2140 PSI.
T/I/O/= 1450/910/130 MONITOR WHP's . POST MITIA .
T/I/O= 950/620/0+. IA FL NEAR SURFACE. (PREP FOR MITIA).
TIO= 1120/800/150 1107 IA FL FOR MITIA. IA FL INCONCLUSIVE; POSSIBLE @
1350' (75 BBLS).
T/I/O = 1180/800/120. TEMP = 1087. MIT - IA TO 3500 PSI PASSED. ( PRE MI
INJECTION). IA FL NEAR SURFACE. BLED IA FROM 800 PSI TO 300 PSI IN 2
MINUTES. PRESSURED IA TO 3500 PSI WITH 7 BBLS OF METHANOL.
STARTED 30 MINUTES TEST. IA LOST 120 PSI IN 15 MINUTES AND A TOTAL
OF 150 PSI IN 30 MINUTES. BLED IA TO 400 PSI. FINAL WHP's = 1180/400/150.
~CANNED MAR ap]g2~J]03
W-03A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
12/28/02
SET 4-1/2 MCX ISSSV @ 2070' SLM <<< 39" OAL, SER# NM-16, HAS 4-1/2 EQ
DEVICE, W/1.125" BEAN, SITP=500#, PULL W/4-1/2 GS >>> CLOSURE TEST
FROM 500# - 200# (GOOD TEST). <<< RETURNED WELL TO OPERATOR >>>
01/02/03 FIRST DAY OF MI GAS INJECTION.
01/17/03 SCHMOO-B-GONE TREATMENT FROM WELLHEAD. INITIAL PRESSURE --- T/I/O
= 315O/420/0.
01/18/03
SCHMOO-B-GONE TREATMENT PUMPED FROM WELLHEAD. FINAL
PRESSURE --- T/I/O = 900/340/0. PUMPED 191 BBLS. SCHMOO/FH20 MIX, 141
BBLS. SH20, 1 BBL. SPEAR, 3 BBLS TAIL AFTER SCHMOO MIX & 5 BBLS. TAIL
AFTER SH20 FLUSH.
02/19/03 TESTEVENT--- TN..1ECT'I'ON PRESSURE, PS]': 3588 PS]',
VOLUME: 14,687 SCFPD.
TYPE: MI
Fluids Pumped
BBLS
1 DIESEL
9 50/50 METHANOL WATER
156 FRESH WATER
141 SEA WATER
32 SCHMOO-B-GONE
339 TOTAL
~CANNEU ~AR ~) 7 2003
Page 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of reque~i'i Abandon- ..... S~'~pend_ Operaiion~i'"~shutdown _ Re-ente~"~uspended '~vell _ ' ........... SWAP ~NELL FROM / ......
SWAP Well from Alter casing _ Repair well _ Plugging _ Time e~ension _ Stimulate _ H20 to MI INJECTION
H20 to MI (WA~) Change approved program _ Pull tubing _ Variance _ Pedorate _ Other_X
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development__ RKB 83.0 feet
3. Address Exploratow__ 7. Unit or Prope~ name
P. O. Box 196612 Stratigraphic__
Anchorage, AK 99519-6612 Se~ice_X Prudhoe Bay Unit
4. Location of well at surface 8. Well number//
1227' FNL, 1190' FEL, Sec. 21, T11 N, R12E, UM (asp's 612049, 5959030) W-03A
At top of productive inte~al 9. Permit number / approval number
3671' FNL, 421' FEL, SEC 22, T11 N, R12E, UM (asp's 618140, 5956679) 197-139
At effective depth 10. APl number
3724' FNL, 303' FEL, Sec. 22, T11N, R12E, UM (asp's 618258, 5956627) 50-029-21953-01
At total depth 11. Field / Pool
3744' FNL, 259' FEL, Sec 22 T11N, R12E, UM (asp's 618303, 5956608) Prudhoe Bay Oil Pool
12. Present well condition summaw
Total depth: measured 12750 feet Plugs (measured)
true ve~ical 9217 feet
Effective depth: measured 12664 feet Junk (measured)
true ve~ical 9146 feet
Casing Length Size Cemented Measured Depth True ve~ical Depth
Conductor 100' 20" 72 c.f. 154' 154'
Sudace 2647' 13-3/8" 3840 cf Cold Set I & II 2701' 2701'
Intermediate 4745' 9-5/8" 1984 cf Class 'G' 4799' 4736'
Liner 7674' 7" 1523 cf Class 'G' 4591' - 12265' 4551' - 8798'
Sidetrack Liner 647' 4-1/2" x 5-1/2" 152 cf Class 'G' 12103' - 12750' 8653' - 9217'
Perforation depth: measured Open Peals 12415' - 12455', Sqzd Peals 12455' - 12488'
true ve~ical Open Peals 8932' - 8970', Sqzd Peals 8970' - 8979'
JUL ! 20 72
Tubing (size, grade, and measured depth 4-1/2", 12.6~, L-80 TBG ~ 12047' MD. Tubing Tail ~ 121~Ska 0il & Gas Uoiis.
Anchorage
Packers & SSSV (~pe & measured depth) 7" x 4-1/2" Baker S-3 Packer ~ 12047' MD.
4-1/2" HES HXO SSSVLN ~ 2091' MD.
13. A~achments Description summa~ of proposal __X Detailed operations program __ BOP sketch __
14. Estimated date for commencing operation 15. Status of well classification as:
October 2, 2002
16. If proposal was verbally approved Oil __ Gas __ Suspended __
Name of approver Date approved Sewice WAG INJECTOR
17. I hereby ce~i~ that the foregoing is true and correct to the best of my knowledge. Questions? Call Amy Frankenberg ~ 564-4503.
'~ ~ Title: P~dhoe Bay Petroleum Engineer Date July 10, 2002
Amy Frankenbur~ ';~ '?'%~'~ ...............
~ % Prepared b~ DeWa~ne R. Schnorr 564-5174
~, ,', FOR COMMISSION USE ONLY
Conditions of approval: Notify Commis~Fd~ so representative may witness ~ Approval no.
Plug integri~__ BOP Test__ Location clearance __ ~ ~,
Mechanical Integri~ Test_ Subsequent form required 10-
Approved,,~ or~r of,,~he C,~mm,~sio~ ..... Cammy ~sli Taylo~ Commissioner Date
....................... ,
Form 10-403 Rev 06/15/88 ·
,SCANNED JUL 1 2002
SUBMIT IN TRIPLICATE
bp
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P. O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
July 10, 2002
Winton Aubert
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, AK 99501
Dear Winton: //~
Re: Sundry Notice for W-03A Swap from Water to MI Injection
BP Exploration Alaska, Inc. proposes following wellwork to prepare to swap W-03A
from water injection to MI gas injection (est. MI start-up Nov-02). This is the first time
for MI gas injection since the well was converted from a production well to an f
injection well.
I S Drift Tubing as deep as possible
2 C Acid Stim Establish injectivity into perfs
3 MITA Witness by AOGCC.
Well W-03A was converted from a shut-in producing well to a water injection well last
September (9/01/01). The well took one tubing volume of water and the formation
locked up. This well needs a formation acid stimulation before MI is injected. ,~
A copy of the wellbore diagram is attached. Please contact Amy Frankenburg at
564-4503 with any questions.
Sincerely,
Amy Frankenburg
EWE Production Engineer
Pre-acid Slickline
1. Drift the tubing as deep as possible to ensure there are no obstructions.
Coiled Tubinq acid stim
2. RU CT unit for acid stim. Tag PBTD and corrected to ELM slickline tag.
3. Acid stim perforated interval.
4. RDMO.
SCANNED JUL $ 1 200~-
Coiled Tubina Acid Proqram
2. Trap 1500 psi on the 4-1/2" by 9-5/8" inner annulus.
3. MIRU CT. RU return line to adjacent well or returns tank. Be aware of the potential for
H2S in the returns.
4. MU jetting nozzle and RIH. Pump at maximum rate, takhlg"~turns, with slick water (your
choice) while RIH. Circulate the tubing a~/d liner clean of aCy,, stuff/~:hat/may be floating around.
5. Pump minimum rate and tag PBTD for depth control. Cir-C~late a bottoms-up volume
prior to proceeding with the stimulation.
Take care not to wash through and stir up any schmoo on bottom.
,
Pull above the top perfs and check for injectivity with a maximum WHP of 3000 psi. If the
perfs are taking fluid then skip to step 7. If the perfs are too tight then pump 10 bbls of 7.5%
HCI as an attempt to establish injectivity. It may be necessary to take returns in order to
stage acid to the nozzle. If the perfs are still too tight to proceed with the remainder of the
stimulation then contact the Well Ops Supervisor and Paul Bartel for a group head scratch.
.
Make multiple passes across the perfs and pump the following at maximum rate with a
recommended maximum WHP of 2000 psi (*). Don't wash the acid below 12440' in order to
minimize acid contactinq the squeeze perfs. Make one pass to bottom while pumping the
overflush in case acid has swapped in the sump. Avoid stirring up schmoo at PBTD. Don't
POOH until the entire overflush has been pumped behind pipe in order to reduce the chance
of stirring up schmoo.
25 bbls
50 bbls
25 bbls
100 bbls
3% NH4CI with 10% U-66 and 0.2% F103
7.5% HCI
9% - 1% HCI-HF
3% NH4CI with 10% U-66 and 0.2% F103 overflush (behind pipe)
* Go to 3000 psi during the first half of the HCI stage if necessary to establish injection. Once
mud acid is at the perfs the maximum treating pressure should be 2000 ps£
All fluids should be filtered to 3 microns.
Please note the initial and final injectivity in the WSR summary. Please note the rates and
pressures in the WSR when each stage hits the perfs. Please run a cable so that the pump
truck can record back side WHP on the treating report. Please e-mail the EXCEL treating report
(5 minute readings) to the program author.
8. POOH. Bleed lAP. RDMO. Immediately put on injection.
Treatment Design:
-125 bbls 3% NH4CI water with 10% U-66 and 0.2% F103
2100 gal 7.5% HCI
0.5% A261
0.5% A201
20 ppt L58
0.2% F103
0.5% W54
0.5% W35 ,/'~
1050 ~lal 9/1 HCI/HF
?o A261
0.5% A201
20 ppt L58
O.2% F1 O3
O.5% W54
0.5% W35
Please note the acid titrations and iron ppm on the WSR.
TREE= 4-1/8" CAMERON
WELLHEAD = FMC
ACTUATOR = AXELSON
KB. ELEV = 83.42'
BF. LEV = 29.15'
KOP= 3918'
Datum Iv13 = 12359'
Datum TVD = 8800' SS
113-3/8"CSG, 72#, L-80, ID: 12.347" H 2701' ~'~
IMinimum ID = 3.725" @ 12091' I
4-1/2" HES XN NIPPLE
I
W-03A
SAFETY NOTES: WLEG WAS ACTUALLY SPACED OUT
3' INTO Tlr:RACK SLEEVE
2091' H4-1/2'' HBS I-D(OSSSV NIP, ID= 3.813"
GAS LIFT MANDRELS
TYPE VLV ~ LATCH
CA-KBG-2LS BTM
CA-KBG-2LS BTM
CA-KBG-2LS
PORT DATE
ITOPOF7"LNR H 4591'
ITOPOFCBvIENT H 4620'
4-1/2" TBG, 12.6#, L-80,
4811'
TDS, 0.0152 bpf, ID=3.958" J
ITOPOF4-1/2" TBG MOD- BUTT H 4811'
PERFORATION SUMMARY
REF LOG: BHG/GR ON 08/11/97
ANGLE AT TOP PERF: 28 @ 12415'
Note: Refer to Production DBfor historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 6 12415- 12468 S 01/24/98
2-7/8" 6 12415 - 12435 O 02/08/98
I EZSV H 5000'
I-r°P°"cE~NT I-I 9o81'
4591'
12036'
12047'
H9-5/8" X7" ZXPPKR I
MLLOUT WINDOW
4799' - 4844'
H4- I/Z' I-ES X NP, ID= 3.813"I
7" X4-1/2"BKP, S-3 PKR, ID= 3.875" I
12070' H4-1/2"HESX NIP, ID =3.813" J
12091' H4-1/2"HES XN NIP, ID=3.725" I
12103' H4-1'2" WLEG ]
12113' HELMD TT LOGGED 02/07/95
12103' 7" X 5" ZXP PI/d~,, D = 3.85"
12124' ~1/2"x
9-5/8" CSG, 47#, ID = 8.681" H 9481'
~ 9815'
I PBTD H 9903'
5-1/2"LNR, 17#,L-80, .0232bpf, ID=4.892" H 9980'
ITOPOF 7" LNR 11150'
I7" LNR, 26#, MOI~BUI-r, I--I 11150'
.0383 bpf, ID = 6.276"
7" LNR, 29~, L-80, .0371 bpf, ID= 6.184" 12265'
I PB'rD ~ 12663'
4-1/2" LNR, 12.6#, L-80,
IBT MOD, .0152 bpf, ID = 3.953"
12750'
DATE REV BY COIVIVII3qTS DATE REV BY COMMENTS
1989 ORIGINAL COMPLETION
08/15/97 CHH SIDETRACK / NA BORS 18E
02/06/01 SIS-QAA CONVERTED TO CANVAS
03/05/01 SIS-LG FINAL
PRUDHOE BAY UNIT
WELL: W-03A
PERMIT No: 197-1390
AFl No: 50-029-21953-01
SEC 22, T11N, R12E
BP Exploration (Alaska)
SCANNED JUL
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
JANUARY 03, 2 001,
M
p i
A T
E
W
E IA L U N U ~ t~
T
H IS M ARK ER
C:LORIkMF~M.DOC
AOGCC Geological Materials Inventory
>ERMJTb } g., ~ r-O
97-139 BP EXPLORATION
Log Data Sent Recieved
7806 S~CHL~ PEX-BHC/HALS-GR 9/10/97 9/11/97
7858 (~MAR MRIL 11/20/97 11/21/97
BHC/SL ~68-12700 9/10/97 9/11/97
DIFF.SPEC. ~AR (C) 12288-12740 11/20/97 11/21/97
DIR SR~ ~UM 4783.-12265. 12/3/97 12/4/97
~ * ~/~ ~'~0~ ~'~-- ~/~/~ 8/19/98 8/20/98
· . - ql~lq~
~v-wm ~56~-~22oo ~'~/~ lq~ ~2/~/9s ~2/~/98 .
~ ~~(c) ~22~8-~274o ~3'z/5~ ~/2o/97 ~/2~/97
~ ~-~2468 I~ ~' ~ ~ ~o/2o/~7 ~o/2o/97
PEX-AIT ~68-12740 9110~97 9111197
PEX-ALAT ~8-12740 9110197 911 I197
PEX-CN ~268-12720 9110197 911 I197
PEX-CN~DT ~2268-12730 9110197 911 I197
PEX-SSTVD ~65-12748 9110197 911 I197
~o,-s~~ ~s ~3oo-~26oo lo/~ofq7 ~9~
1215197
v~o~-sv~x~/ ~s ~000-~2600 io/~o/~ ~2/3/~7 ~2/~/9v
~ ,~0~-~700 8/~v/~ 9,~0~97 9,~
~i~ ~ (~)~00-~6~0 ~I~3D'7 9,~0,9~
Box
UIC
UIC
UIC
Tuesday, August 31, 1999 Page I of 2
Are dry ditch samples required? yes ~o
Was the well cored? ~-- yes ~o
Aretests required? yes ~-no
Well is in compliance
1
Comments
And received? y~ '~-' no
Analysis description recieved? ~ yes _ _
Received?.._..~yes n~-'~
no
Tuesday, August 31, 1999 Page 2 of 2
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
AITN: Sherrie
NO. 12120
Company Alaska Oil & Gas Cons Comm
Attn: Lorl Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Cased Hole)
12/3/98
qo.
Well Job it Log Description Date Blueline Sepia
C- 12A PRODUCTION PROFILE 981008 1 1
C-21 ~RODUCTION PROFILE 980923 1 1
F- 14 PRODUCTION PROFILE 981030 1 1
G-04A MEMORY INJECTION 980806 1 1
M-6A PRODUCTION PROFILE 981029 1 1
M-6A PRODUCTION PROFILE W/DEFT 981029 1 1
M-6A GAS LIFT SURVEY 981029 1 1
M-12 x.~.~ C. VARIABLE DENSITY 981011 1 1
M-34 DIGITAL FLUID ENTRY 980819 1 1
N-09 PRODUCTION PROFILE 981015 1 1
N- 16 PRODUCTION PROFILE 981028 1 1
N- i 6 PRODUCTION PROFILE W/DEFT 981028 1 1
N-16 GAS LIFT SURVEY., .' 981028 1 1
W-03A b.~ ~.-- INJECTION PROFILE 981004 1 1
W-12 (31-33-11-120 CEMENT RETAINER 981002 1 1
Z-01 STATIC SURVEY 981022 1 1
Z-9 PRODUCTION PROFILE 980930 1 1
Z-11 PRODUCTION PROFILE 981016 1 I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E, Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
REGEIVED
Schlumberger GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
A~N: Sherries_ ~/~
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11506
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
9/23/98
Well Job if Log Description Date BL RF Sepia LIS Tape
, ,
G-21 PRODUCTION PROFILE 980906 1 1
G-26A RFT 980905 1 1
J- 22 STATIC SURVEYS 9 80918 I 1
M-08 PRODUCTION PROFILEr GLS 980830 1 1
M-08 GHOST/PSP 980831 I 1
M-08 PROD. PROFILE W/DEFT & GHOST 980831 I 1
M-08 DEFT IMAGES 980831 I 1
M- 34 PRODUCTION PROFILE 980819 I 1
, ,
M-34 DEFT 980819 I 1
N-9 N-9 980913 1 1
N- 14A PRODUCTION PROFILE 980826 I 1
W-03A INJECTION PROFILE 980904 I 1
X-01 '7~. O'~-~ PRODUCTIONLOG,STATICPRESS/TEMP 980910 I 1
X-04 PRODUCTION LOG~STATIC PRESS/TEMP 980910 1 1
Z-08A GAS LIFT SURVEY 980919 I 1
Z-08A PRODUCTION PROFILE 980919 I 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11445
Company:
Field:
Alaska OII & Gas Cons Comm
Attn: Lorl Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
8/19/98
Well Job # Log Description Date BL RF Sepia LIS Tape
C- 10 PRODUCT~N PRORLE 980809 I I '"
G-16 PRODUCTION PROFILE 980705 1 1
G- 16 PRODUCTION PROFILE 980726 I 1
H-31 IAj~-''- INJECTION PRORLE 980610 I i
, .,
N-09 PRODUCTION PROFILE W/DEFT 980704 I 1
Q-03 A STATIC PRESSURE SURVEY 980629 1 1
R - 12 PRODUCTION PROFILE 980811 I 1
R-12 PRODUCTION PROFILE 980811 I 1
,
R'32A L,L.t C.... INJECTION PROFILE 980701 1 1
W-03 ,q, (A-I C. INJECTION PROFILE 980723 I 1
W-8 GAS LIFT SURVEY 980715 1 1
,
W-23 GAS LIFT SURVEY 980714 I 1
Y-09A GAS LIFT SURVEY 980711 I 1
Y-32 FIST 980409 I 1
Z-03 PRODUCTION LOG 980814 1 1
,
Z-03 GAS LIFT SURVEY 9 80 814 1 1
Z-29 PRODUCTION LOG 9 80 7 20 I 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
~J '03
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
AUG 2 0 1998
Alas~ O, & Gas (~ons. t~mmlsaon
Anehomne
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
..... STATE OF ALASKA
ALASKA _,~ AND GAS CONSERVATION COM,vilSSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: []Operation Shutdown []Stimulate
[] Pull Tubing []Alter Casing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1227' SNL, 1191' WEL, SEC. 21, T11N, R12E, UM
At top of productive interval
3671' SNL, 4859' EWL, SEC. 22, T11N, R12E, UM
At effective depth
3705' SNL, 319' EWL, SEC. 22, T11N, R12E, UM
At total depth
3741' SNL, 5027' EWL, SEC. 22, T11N, R12E, UM
[] Plugging [] Perforate
[] Repair Well []Other
5. Type of well:
[] Development
I--I Exploratory
I-q Stratigraphic
[~ Service
6. Datum Elevation (DF or KB)
KBE -- 82.65'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
W-03Ai
9. Permit Number / Approval No.
97-139
10. APl Number
50-029-21953-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
12750 feet Plugs (measured)
9218 feet
12664 feet Junk(measured)
9146 feet
1-1/2" Camco GLV at 9912' ELM
Length Size Cemented M D
110' 20" 8 cu yds 137'
2664' 13-3/8" 3840 cuft 2701'
9444' 9-5/8" 1984 cuff 9481'
748' 5-1/2" 350 cuff 9232'-9980'
TVD
137'
2701'
8795'
8587'-9203'
Perforation depth: measured
true vertical
11415'-11435', 11435'- 11455', 12455'- 12458'; 12458'-12468' (open intervals)
12415' - 12455' (squeezed intervals)
subsea 8045' - 8057', 8057' - 8068', 8886' - 8889'; 8889'-8898 (open intervals
8851 '-8888' (squeezed intervals)
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 @ 12103
Packers and SSSV (type and measured depth) Packer @ 12047'
SSSV @ 2091'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
See Attachment
Treatment description including volumes used and final pressure
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
5. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys;, run F~ Oil ~-~ Gas [-~ Suspended
[] Daily Report of Well~Oper..at/(ons ~
7. I hereby certifv/t'hat ti~ fore~o0ing is tru~¢n~E'orrect to the best of my knowledge
Signed'~L~Cs~/~,,,~- ~_-,,'-,~/7 ~.~~.~¢/~ Title TechnicalAssistantlll
Prepared By Name/Number:
Form 10-404 Rev. 06/15/88
Service Water Injection
D a t e '~------~./~ ('~?' ,~
Submit In Duplicate~
B~
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11823
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
2/17/98
Well Job # Log Description Date BL RF Sepia LIS Tape
C-09 · PRODUCTION PROFILE 980207 I 1
G-09 ° PRODUCTION PROFILE 980208 I 1
H- 27 , PERFORATE RECORD 980205 I 1
FI- 35 · PRODUCTION PROFILE 980207 I 1
H-35 · DEFT 980207 I 1
W-03 A =ERFORATE RECORD 980207 I 1
X- 12 , =RODUCTION PROFILE 980206 I 1
X-12 · DEFT 980206 I 1
X-12 · GHOST GAS HOLDUP 980206 I I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received by:
...
· ~ . - ~ .> ~.: .... ,~- -_ - _- . - .'- ~ ' ' .: . :~.'- :.-- .%~_ . '--::. . .. ' 2.. :- - ' '
15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 · (281) 590-5494 ° FAX: (281) 590-5495
December 12, 1997
State of Alaska
Alaska Oil & Gas Conservation Commission
Attn.: Lori Taylor
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Ms. Taylor:
Enclosed, please find the following items: 71 //'~ ~o ] z~ ] ~,,~
· Nine-track tapes containing requested data for the wells W-03A1 and Z-03 (logged by
NUMAR) in LIS format
· Revised hst ofmemonics for NUMAR MRIL data
· Hard copy of each tape scan
A second copy of this letter has been enclosed for your records. Please sign below to
acknowledge receipt of this package and send one copy to the following address:
BP Exploration (Alaska) Inc.
Attn.: Mr. David W. Douglas
Petrotechnical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Should you have any questions or concerns, please do not hesitate to call me.
Dwayne Weaver
Enclosure~.., ~ ~....~~
Signature._./~~~
Date
15311 VANTAGE PARKWAY WEST. SUITE 350 · HOUSTON, TX 77032 · (281) 590-5494 · FAX: (281) 590-5495
December 8, 1997
State of Alaska
Alaska Oil & Gas Conse,waion Cow, mission
Attn.' !:.ori T~.ylor
3001 Porcupine Dr/ye
Anchorage, Alaska 99501
Dear Ms. Taylor:
On November 20, i997, NUi~,~,R sent you two nine-track tapes containing d~.ta thr Well
W-03AI. a~-~d Well Z-03, respectively. It has recently been determined that the data fo~'mat
on the t~pes is incon-ect. Thus, Nq:._.rMAR will reproduce the tapes. To prevent any future
confusion, please remm ,.he old tapes to my attention at your earEest convenience. Ul~on
receipt of'the old tapes, NUMAR w/Il prepare two new tapes w/th the co,'i'ect data format.
ThapJc you ibr your assistance in this matter. Your prompt response :v~li allow' NX. TMAR
to distribute the corrected tapes in a timely manner. Should you have any questions or
concerns, please do net hesitate to cai1 me.
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11610
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
12/3/97
Well Job # Log Description Date BL RF Sepia LIS Tape
B- 06 · PERFORATE RECORD 971 029 I 1
B-12A [.k.\ C,.~ PERFORATE RECORD 971026 I 1
C-24 ~ PERFORATION RECORD 971 031 I 1
H- 08 e PERFORATING RECORD 971 020 I 1
H-14 , PERFORATING RECORD 971 020 I 1
H- 14 , PERFORATING DEPTH RECORD 971 020 1 1
H-27 ~ PERFORATING RECORD 971 028 I 1
M-20 " Lk~.~ WHIPSTOCK SETTING RECORD 971025 I 1
M-23 0 PERFORATION RECORD 971 027 I 1
N-04A , PERFORATION RECORD 971023 I 1
Q-01A , PATCH SE'rrING RECORD 971026 1 1
W-03A ~ PRODUCTION PROFILE 971030 I 1
W-03A ~ PRODUCTION PROFILE 971030 I 1
W- 08 , PERFORATE RECORD 971 021 I 1
W-23 ~ CORRELATION LOG 971 026 I I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
D[.C 0 5
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
, STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
CO P, T O. O, , Po,'r ^.orCEll/ED
1. Status of Well Classification of Se~i~VVell4 '~
[] Oil [] Gas [] Suspended []Abandoned [] Service Water Injection
2. Name of Operator 7. Permit~{~j! ~ was Cons. CommJssi0,
BP Exploration (Alaska)Inc. 97-139 Anchorage
i3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 ........... ~l ~ 50-029-21953-01
4. Location of well at surface ~ ';,?,~ :'. ~i~;'.! ! ~mm~,~,,-, 9. Unit or Lease Name
1227' SNL, 1191' WEL, SEC. 21, T11N, R12E, UM ~i'i~ i ~ Prudhoe Bay Unit
At top of productive interval ............... ~_~. '~~ 10. Well Number '"
3671'SNL, 4859'EWL, SEC. 22, TllN, R12E, UM !~:~.~. i~' \ w-0aAi
At total depth ¢.--t" "-~' .... ~' ' " 11. Field and Pool
3741' SNL, 5027' EWL, SEC. 22, T11N, R12E, UM :' .................. - '
Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 82.65'I ADL 028263
12. Date Spudded8/1/97 I 13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l 15' Water depth' if °ffsh°re I16' N°' °f C°mpleti°ns8/11/97 8/15/97 N/A MSL One
i17. Total Depth (MD+TVD)I18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121 · Thickness of Permafrost
12750 9218 FTt 12664 9146 FTI [~Yes []No (Nipple) 2091' MD 1900' (Approx.)
i22. Type Electric or Other Logs Run OR
' MWD, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES, RFT, NUMAR, USIT ! F2'_ I I\! ^ I
23. CASING~ LINER AND CEMENTING RECORD I ~} I I ~ ~ ~
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" Conductor Surface 100'
13-3/8" 68# L-80 Surface 2701' 17-1/2" 3840 cuft Cold Set I & II
9-5/8" 47# NT-80S Surface 4799' 12-1/4" 1984 cuft Class 'G'
7" 26#/29# L-80 4591' 12265' 8-1/2" 1523 cuft Class 'G'
4-1/2" 12.6# L-80 12103' 12750' 6" 152 cuft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 12103' 12047'
MD TVD MD TVD
12415' - 12468' 8933' - 8979' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 150 Bbls of Diesel
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
September 17, 1997I Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure '.CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. ~4-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Sag River 12250' 8785'
Shublik 12270' 8803'
Top of Sadlerochit 12400' 8919'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify t,b. at the foregoing is t~e and correct to the best of my knowledge
James -' .... Title Senior Drillin9 Engineer, Actin9 Date
W-03/Ai 97-139 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Ni~mber Permit No. / Approval No,
INSTRUCTIONS
GENERA': This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
iTEM 1-' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
·
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
I'rEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
iTEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
~TEM 2?: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Progress Report
Facility PB W Pad
Well W-03A
Rig Nabors 18E
Page 1
Date 20 November 97
Date/Time
27 Jul 97
28 Jul 97
29 Jul 97
30 Jul 97
31 Jul 97
01 Aug 97
02 Aug 97
03 Aug 97
04 Aug 97
05 Aug 97
06 Aug 97
21:30-06:00
06:00-07:00
07:00-17:00
17:00-04:00
04:00-06:00
06:00-13:00
13:00-23:00
23:00-06:00
06:00-09:00
09:00-10:30
10:30-12:00
12:00-12:30
12:30-15:00
15:00-06:00
06:00-12:00
12:00-12:30
12:30-20:00
20:00-21:00
21:00-01:00
01:00-04:00
04:00-06:00
06:00-07:00
07:00-12:00
12:00-12:30
12:30-15:30
15:30-22:00
22:00-06:00
06:00-12:00
12:00-12:30
12:30-00:00
00:00-00:30
00:30-01:00
01:00-04:00
04:00-06:00
06:00-12:00
12:00-12:30
12:30-20:00
20:00-21:00
21:00-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-00:00
Duration
8-1/2 hr
lhr
10hr
llhr
2hr
7hr
10hr
7hr
3hr
1-1/2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
15 hr
6hr
1/2 hr
7-1/2 hr
lhr
4hr
3hr
2hr
lhr
5hr
1/2 hr
3hr
6-1/2 hr
8hr
6hr
1/2 hr
11-1/2 hr
1/2 hr
1/2 hr
3hr
2hr
6hr
1/2 hr
7-1/2 hr
lhr
3hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2hr
11-1/2 hr
Activity
Rig moved 80.00 %
Rig moved 100.00 % (cont...)
Commissioned Fluid system
Rigged up BOP stack
Laid down Tubing of 0.00 ft
Laid down 5106.00 ft of Tubing (cont...)
Set packer at 5000.00 ft with 0.0 psi
Installed Seal assembly
Installed Seal assembly
Tested Casing
Made up BHA no. 1
Held safety meeting
R.I.H. to 5000.00 ft
Functioned downhole tools at 4799.00 ft
Functioned downhole tools at 4799.00 ft (cont...)
Held safety meeting
Functioned downhole tools at 4844.00 ft
Serviced BOP stack
Displaced slurry - 31.000 bbl
Held 1500.0 psi pressure on 1.000 bbl squeezed cement
Tested BOP stack
Tested BOP stack (cont...)
R.I.H. to 4620.00 ft
Held safety meeting
Drilled cement to 4802.00 ft
Drilled to 4858.00 ft
Drilled to 5216.00 ft
Drilled to 5843.00 ft (cont...)
Held safety meeting
Drilled to 6467.00 ft
Held safety meeting
Pulled BHA
R.I.H. to 6467.00 ft
Drilled to 6600.00 ft
Drilled to 7274.00 ft (cont...)
Held safety meeting
Drilled to 7836.00 ft
Rigged up Mud pumps
Drilled to 8055.00 ft
Held safety meeting
Drilled to 8600.00 ft
Drilled to 8969.00 ft (cont...)
Held safety meeting
Drilled to 9814.00 ft
Held safety meeting
Drilled to 10033.00 ft
Drilled to 10346.00 ft (cont...)
Held safety meeting
Drilled to 10919.00 ft
Held safety meeting
Drilled to 11230.00 ft
Drilled to 11536.00 ft (cont...)
Held safety meeting
Drilled to 11846.00 ft
Progress Report
Facility PB W Pad
Well W-03A
Rig Nabors 18E
Page 2
Date 20 November 97
Date/Time
07 Aug 97 00:00-00:30
00:30-06:00
06:00-09:30
09:30-10:30
10:30-11:30
11:30-12:00
12:00-12:30
12:30-15:00
15:00-19:00
19:00-19:30
19:30-20:30
20:30-22:00
22:00-23:00
23:00-23:30
23:30-00:00
08 Aug 97 00:00-00:30
00:30-01:00
01:00-06:00
06:00-08:00
08:00-11:00
11:00-12:00
12:00-12:30
12:30-15:00
15:00-18:00
18:00-20:30
20:30-21:00
21:00-22:30
22:30-00:00
09 Aug 97 00:00-00:30
00:30-06:00
06:00-09:00
09:00-10:00
10:00-12:00
12:00-12:30
12:30-13:30
13:30-14:30
14:30-15:30
15:30-16:30
16:30-23:00
23:00-00:00
10 Aug 97 00:00-00:30
00:30-01:30
01:30-03:00
03:00-05:30
05:30-06:00
06:00-07:00
07:00-07:30
07:30-09:00
09:00-12:00
12:00-12:30
12:30-13:00
13:00-00:00
11 Aug 97 00:00-00:30
00:30-05:00
Duration
1/2 hr
5-1/2 hr
3-1/2 hr
lhr
lhr
1/2 hr
1/2 hr
2-1/2 hr
4hr
1/2 hr
lhr
1-1/2 hr
lhr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
5hr
2hr
3hr
lhr
1/2 hr
2-1/2 hr
3hr
2-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
5-1/2 hr
3hr
lhr
2hr
1/2 hr
lhr
lhr
lhr
lhr
6-1/2 hr
lhr
1/2 hr
lhr
1-1/2 hr
2-1/2 hr
1/2 hr
lhr
1/2 hr
1-1/2 hr
3hr
1/2 hr
1/2 hr
llhr
1/2 hr
4-1/2 hr
Activity
Held safety meeting
Drilled to 11950.00 ft
Drilled to 12265.00 ft
Circulated at 12265.00 ft
Pulled out of hole to 10931.00 ft
R.I.H. to 12265.00 ft
Held safety meeting
Circulated at 12265.00 ft
Pulled out of hole to 2992.00 ft
Serviced Block line
Pulled out of hole to 647.00 ft
Pulled BHA
Installed BOP stack
Tested Top ram
Rigged up Casing handling equipment
Held safety meeting
Rigged up Casing handling equipment
Ran Liner to 4800.00 ft (7in OD)
Circulated at 4799.00 ft
Ran Liner to 7675.00 ft (7in OD)
Ran Drillpipe in stands to 9002.00 ft
Held safety meeting
Ran Drillpipe in stands to 12265.00 ft
Circulated at 12265.00 ft
Mixed and pumped slurry - 271.000 bbl
Reverse circulated at 4591.00 ft
Circulated at 4591.00 ft
Pulled Drillpipe in stands to 0.00 ft
Held safety meeting
Laid down 7410.00 ft of 5in OD drill pipe
Laid down 7500.00 ft of 5in OD drill pipe
Rigged up Top ram
Tested BOP stack
Held safety meeting
Tested BOP stack
Installed Bore protector
Tested Casing
Made up BHA no. 4
Singled in drill pipe to 8391.00 ft
R.I.H. to 10716.00 ft
Held safety meeting
R.I.H. to 12064.00 ft
Drilled cement to 12184.00 ft
Drilled installed equipment - Landing collar
Drilled cement to 12224.00 ft
Circulated at 12224.00 ft
Held drill (Kick (well kill))
Drilled to 12285.00 ft
Circulated at 12285.00 ft
Held safety meeting
Circulated at 12285.00 ft
Drilled to 12617.00 ft
Held safety meeting
Drilled to 12750.00 ft
Progress Report
Facility PB W Pad
Well W-03A
Rig Nabors 18E
Page 3
Date 20 November 97
Date/Time
12 Aug 97
13 Aug 97
14 Aug 97
15 Aug 97
05:00-06:00
06:00-08:00
08:00-12:00
12:00-12:30
12:30-13:30
13:30-14:30
14:30-15:30
15:30-17:00
17:00-19:00
19:00-22:30
22:30-02:30
02:30-06:00
06:00-09:00
09:00-16:00
16:00-17:00
17:00-18:00
18:00-20:30
20:30-05:00
05:00-06:00
06:00-07:00
07:00-08:00
08:00-11:00
11:00-11:30
11:30-12:00
12:00-12:30
12:30-20:00
20:00-21:00
21:00-01:30
01:30-02:30
02:30-04:00
04:00-04:30
04:30-05:00
05:00-06:00
06:00-12:00
12:00-12:30
12:30-13:30
13:30-14:00
14:00-17:00
17:00-18:00
18:00-19:30
19:30-00:00
00:00-00:30
00:30-04:30
04:30-05:30
05:30-06:00
06:00-06:30
06:30-10:00
10:00-12:00
Duration
lhr
2hr
4hr
1/2 hr
lhr
lhr
lhr
1-1/2 hr
2hr
3-1/2 hr
4hr
3-1/2 hr
3hr
7hr
lhr
lhr
2-1/2 hr
8-1/2 hr
lhr
lhr
lhr
3hr
1/2 hr
1/2 hr
1/2 hr
7-1/2 hr
lhr
4-1/2 hr
lhr
1-1/2 hr
1/2 hr
1/2 hr
lhr
6hr
1/2 hr
lhr
1/2 hr
3hr
lhr
1-1/2 hr
4-1/2 hr
1/2 hr
4hr
lhr
1/2hr
1/2 hr
3-1/2 hr
2hr
Activity
Pulled out of hole to 12192.00 ft
Circulated at 12750.00 ft
Pulled out of hole to 1250.00 ft
Held safety meeting
Pulled out of hole to 633.65 ft
Pulled BHA
Rigged up Survey wireline unit
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Rigged down Wireline units
Rigged up Casing handling equipment
Ran Liner to 647.00 ft (4-1/2in OD)
Ran Drillpipe on landing string to 12750.00 ft
Circulated at 12750.00 ft
Circulated at 12750.00 ft
Mixed and pumped slurry - 24.300 bbl
Circulated at 12663.00 ft
Rigged down Circulating head
Laid down 945.00 ft of 5in OD drill pipe
Held safety meeting
Laid down 11158.00 ft of 3-1/2in OD drill pipe
Rigged up Survey wireline unit
Conducted electric cable operations
Rigged down Wireline units
Rigged up Top ram
Tested Casing
Held safety meeting
Ran Tubing to 800.00 ft (4-1/2in OD)
Ran Tubing to 8750.00 ft (4-1/2in OD)
Held safety meeting
Ran Tubing to 10000.00 ft (4-1/2in OD)
Installed SCSSSV nipple assembly
Ran Tubing to 12103.00 ft (4-1/2in OD)
Space out tubulars
Rigged up BOP stack
Installed Xmas tree
Held safety meeting
Reverse circulated at 12103.00 ft
Tested Tubing
Tested Casing
Tested Casing
Freeze protect well - 150.000 bbl of Diesel
Installed Hanger plug
W-03A
INITIAL PERF
9/17/97
SUMMARY
The following initial interval was perforated using 2-7/8" guns, 6 SPF, random
orientation and 60° phasing.
12415'- 12468' MD
SHARED SERVICES DRILLING
PBU / W-03A
5oo2921953o1
NORTH SLOPE BOROUGH
COMPUTATION DATE: 8 / 18 / 97
Y-SUN DRILLING SERVICES PAGE 1
ANCHOR3~GE ALASKA ~7-
DATE OF SURVEY: 081197
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-RI-70238
KELLY BUSHING ELEV. = 82.65 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
12178.42 8720.49 8637.84
12341.84 8867.30 8784.65
12432.79 8948.37 8865.72
12527.21 9030.81 8948.16
12620.20 9109.89 9027.24
26 2 S 71.10 E .00 2409.25S 5957.99E 6426.41
26 3 S 68.86 E .60 2433.82S 6025.41E 6498.15
27 50 S 67.26 E 2.10 2449.23S 6063.63E 6539.36
30 29 S 66.59 E 2.84 2467.27S 6105.96E 6585.35
32 59 S 69.16 E 3.06 2485.66S 6151.28E 6634.25
12671.84 9152.90 9070.25 34 10 S 65.98 E 4.11
12750.00 9217.56 9134.91 34 10 S 65.98 E .00
2496.57S 6177.67E 6662.81
2514.44S 6217.78E 6706.68
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 6706.95 FEET
AT SOUTH 67 DEG. 58 MIN. EAST AT MD = 12750
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 111.50 DEG.
TIE-IN SURVEY AT 12,178.42' MD
PROJECTED SURVEY AT 12,750.00' MD
SP~ '-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU / W- 03A
50o292195301
ORTH S ,O E BOROUG
COMPUTATI ON DATE: S / 18 / 97
DATE OF SURVEY: 081197
JOB NUMBER: AK-EI-70238
KELLY BUSHING ELEV. = 82.65 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
12178.42 8720.49 8637.84
12750.00 9217.56 9134.91
2409.25 S 5957.99 E 3457.93
2514.44 S 6217.78 E 3532.44 74.51
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPI
-SUN DRILLING SERVICES
ANCHOtLAGE ALASKA
PAGE
SI-LARED SERVICES DRILLING
PBU / W-03A
500292195301
NORTH SLOPE BOROUGH
COMPUTATION DATE: 8/18/97
DATE OF SURVEY: 081197
JOB NUMBER: AK-EI-70238
KELLY BUSHING ELEV. = 82.65 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD
DIFFERENCE
VERTICAL
CORRECTION
12178.42 8720.49 8637.84 2409.25 S 5957.99 E 3457.93
12247.60 8782.65 8700.00 2419.09 S 5986.72 E 3464.95
12358.92 8882.65 8800.00 2436.53 S 6032.42 E 3476.27
12471.77 8982.65 8900.00 2456.45 S 6080.72 E 3489.12
7.02
11.32
12.85
12587.90 9082.65 9000.00 2479.35 S 6135.10 E 3505.25
12707.80 9182.65 9100.00 2504.79 S 6196.12 E 3525.15
12750.00 9217.56 9134.91 2514.44 S 6217.78 E 3532.44
16.13
19.90
7.29
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
~,'F4 B m~il ~z-4 ~[_~[~'~ Anadrill
Client:
Field:
Well Name:
APl number:
Job umber:
Rig:
County:
State:
BP Exploration
Prudhoe Bay
W-03Ai
50-029-21953-01
400001069
NABORS !8-E
NSB
AK
Survey Calculations
Calc method for positi Minimum Curvature
Calc method for DLS: Mason & Taylor
Depth references
Permanent datum MSL
Depth reference KB, 83.42
GL above Permanent 52.77 FT
KB above Permanent 83.42 FT
DF above Permanent 81.92 FT
Vertical section origin
Latidude (+N/S-): 0
Depadure (+E/W-): 0
Azim from rotary table to target: 111.15
SURVEY REPORT
degrees
FT
Spud Date:
Last survey date:
Total accepted survey
MD of first survey:
MD of last survey:
Geomagnetic data
1-Aug-97
7-Aug-97
102
4818 FT
12178
Magnetic Model: BGGM 1996 Version
Magnetic Date: 1-Aug-97
Magnetic field strengt 1146.72 HCNT
Magnetic dec (+E/W-) 28.19 degrees
Magnetic Dip: 80.67 degrees
MWD Survey Reference Criteria
Reference G: 1002.68
Reference H: 1146.72
Reference Dip: 80.67
Tolerance G: 4
Tolerance H: 6
Tolerance Dip: 0.3
Correction
Magnetic dec (+E/W-)
Grid convergence (+E
Total az corr (+E/W-):
Schlumberger ANADRILL Survey Report
Seq Measured Incl Azimuth Course TV[;) Vertical
# Depth angle angle length depth section
(fi) (deg) (deg) (fi) (fl) (ft)
28.19 degrees
0 degrees
28.19 degrees
Displacement Total
+N/S- ' +ENV- isplacement
(~)
at Azm DLS Srvy Tool
(deg/ tool quality
(deg) 100f) type type
4783.00 27.58 123.70 0.00 4722.30 306.40
4818,47 29.88 t22.8 35.5 4753.43 323.09
4850.12 32.74 t22.1 31.6 4780.42 339.19
4880.35 34.29 121.3 30.3 4805.69 355.64
4912.02 36.45 120.60 31.60 4831.45 373.66
6 4942.78 38.67 119.80 30.80 4855.87 392.20
7 4974,79 40.81 119.10 32.00 4880.47 412.45
8 5006.75 43.11 121.50 32.00 4904.27 433.56
9 5037.33 45.41 12t.40 30.50 4926.11 454.50
10 5069.04 47.97 120.60 31.70 4947.85 477.23
11 5098.78 50.36 119.10 29.80 4967.34 499,51
12 5130.20 52.27 118.00 31.40 4986.96 523.82
13 5160.70 54.37 116.00 30.50 5005.18 548.15
14 5191.33 56.76 113.50 30.60 5022.48 573.33
15 5222.58 58.78 110.40 31.30 5039.18 599.80
t6 5253.27 59.95 109.10 30.70 5054.82 626.21
17 5284.31 60.34 107.90 31,00 5070.26 653.06
18 5378.64 59.99 107.20 94.30 5117.17 734.70
19 5471.62 61.95 108,60 93.00 5162.30 815.88
20 5565.87 62.26 109.20 94.30 5206.42 899.16
21 5661.09 62.03 t08.50 95.20 5250.90 983.26
22 5755.07 61.29 108.80 95.00 5296.00 1066.79
23 5849.71 61.25 109.30 93.60 5340.99 1148.82
24 5943.22 61.09 110.70 93.50 5386.08 1230.71
25 6036.85 60.90 110.90 93.70 5431.51 1312.65
26 6130.62 60.34 111.10 93.70 5477.48 1394.30
27 6224.58 62.08 1tl.50 94.00 5522.75 t476.68
28 6318.32 61.94 11t.10 93.70 5566.72 1559.42
29 6406.37 61.54 111.40 88.10 5608.44 1637.02
-201.89 250.43 321.67 128.87 0.00 TIP
-211.24 264.7 338.66 128.59 6.59 MWD M
-220.05 278.56 354.99 128.31 9.12 MWD M
-228.84 292.79 371.61 128.01 5.32 MWD M
-238.24 308.48 389.77 127.68 6.95 MWD M
-247.68
-257.74
-268.54
-279.64
-291.52
-302.73
-314.45
-325.54
-336.10
-345.99
-354.89
-363.40
-388.06
-413.06
-440.06
-467.26
-493.99
-520.78
-548.80
-577.90
-607.16
-637.08
-667.07
-695.13
324.71
342.52
360.99
379.15
398.92
418.47
440.00
461.80
484.72
509.27
534.14
559.64
637.64
715.01
793.85
873.51
952.73
1030.31
1107.28
1183.89
1260.12
1336.86
14t3.98
1486.33
408.39 127.34 7.38 MWD M
428.66 126.96 6.83 MWD M
449.92 126.65 8.76 MWD M
471.12 126.41 7.54 MWD M
494.08 126.16 8.28 MWD M
516,50 125.88 8.88 MWD M
540,81 125.55 6.67 MWD M
565.01 125.18 8.66 MWD M
589.84 124.74 10.31 MWD M
615.68 124.19 10.57 MWD M
641.29 123.60 5.47 MWD M
667.28 123.00 3.32 MWD M
746.44 121.32 0.74 MWD M
825.75 120.02 2.48 MWD M
907,67 119.00 0,65 MWD M
990,63 118.14 0.69 MWD M
1073,19 117.41 0.83 MWD M
1154.45 116.81 0.47 MWD M
1235.82 116.36 1.32 MWD M
1317.41 116.02 0.28 MWD M
1398.76 115.73 0.63 MWD M
1480.91 115.48 1.89 MWD M
1563.43 115.26 0.49 MWD M
1640.84 t15.06 0.61 MWD M
Page 1
Schlumberger ANADRILL Survey Report
I Seq Measured Incl Azimuth Course '['VD Vertical Displacement Total at Azm DLS Srvy Tool
# Depth angle angle length depth section +N/S- +E/W- isplacement (deg/ tool quality
(fi) (deg) (deg) (fi) (fl) (fi) (fl) (fi) (fl) (deg) 100f) type type
30 6485.74 61.45 109.00 79.30 5646.29 1706.69 -719.19 1551.72 1710.28 114.87 2.66 MWD M
31 6580.65 61.57 109.00 94.90 5691.55 1790.04 -746.35 1630.58 t 793.27 114.59 0.13 MWD 6-axis
32 6672.37 61.69 109.00 91.80 5735.17 1870.75 -772.64 1706.96 1873.68 114.35 0.13 MWD 6-axis
33 6764.70 61.42 109.90 92.30 5779.14 1951.87 -799.67 1783.48 1954.55 114.15 0.91 MWD 6-axis
34 6859.25 60.95 112.30 94.60 5824.74 2034.75 -829.50 1860.80 2037.32 114.03 2.28 MWD 6-axis
35 6952.80 60.93 11t .00 93.50 5870.16 2116.47 -859.65 1936,76 2118.98 113.93 1.22 MWD 6-axis
36 7048.05 61.00 111.30 95.20 5916.36 2199.71 -889.68 2014.39 2202.12 113.83 0.29 MWD 6-axis
37 7141.18 61.39 110.70 93.20 5961.27 228t .38 -918.95 2090.64 2283.69 113.73 0.70 MWD 6-axis
38 7231.28 60.81 111.80 90.10 6004.81 2360.25 -947.54 2164.15 2362.49 113.65 1.25 MWD 6-axis
39 7326.90 59.69 112.40 95.60 6052.25 2443.24 -978.76 2241.05 2445.46 113.59 1.29 MWD 6-axis
40 7419.99 59.52 113.10 93.10 6099.36 2523.51 -1009.81 2315.11 2525.76 113.57 0.67 MWD 6-axis
41 75t 4.00 59.55 112.80 94.00 6147.02 2604.49 -1041.41 2389.72 2606.78 113,55 0.28 MVVD 6-axis
42 7604.14 59.58 112.50 90.t0 6192.66 2682,15 -1071.32 2461.41 2684.45 113,52 0.29 MWD M
43 7701.80 59.33 112.90 97.70 6242.31 2766.26 -1103.79 2539.03 2768.58 113.50 0.44 MWD 6-axis
44 7795.95 59.06 112.00 94.20 6290.55 2847.15 -1134.69 2613.81 2849,48 113.47 0.87 MWD 6-axis
45 7889.69 58.49 112.20 93.70 6339,13 2927.27 -1164.84 2688.05 2929.58 113.43 0.64 MWD 6-axis
46 7983.85 57.87 111.70 94.10 6388.74 3007.21 -1194.72 2762.21 3009.51 113.39 0.80 MWD 6-axis
47 8077.92 58.69 112.00 94.10 6438.21 3087.25 -1224.52 2836.50 3089.53 113.35 0.91 MWD 6-axis
48 8172.95 61.23 110.90 95.10 6485.82 3169.57 -1254.61 2913.12 3171.80 113.30 2.85 MWD 6-axis
49 8265,95 61.94 11t.10 93.00 6530.07 3251.36 -1283.92 2989.48 3253.53 113.24 0.79 MWD 6-axis
50 8359.12 62.00 110.40 93.10 6573.82 3333.54 -1313.04 3066.33 3335.64 113.18 0.67 MWD 6-axis
51 8453.53 62.20 109.70 94.40 6618.00 3416.95 -1341.64 3144.70 3418,94 t13.10 0.69 MWD 6-axis
52 8549.38 62.27 109.10 95.90 6662.67 3501.77 -1369.83 3224.74 3503,63 113.02 0.56 MWD 6-axis
53 8644.06 62.20 108.30 94.70 6706.79 3585.49 -1396.69 3304.12 3587,19 112,91 0.75 MVVD 6-axis
54 8737.62 60.87 110.30 93.50 6751.35 3667.63 -t423.85 3381.69 3669.22 112.83 2.36 MWD 6-axis
55 8833.32 60.40 110.20 95.70 6798.28 3751.03 -1452.72 3459,94 3752.54 112.78 0.50 MWD 6-axis
56 8927.56 60.10 t10.20 94.30 6845.08 3832.89 -1480.99 3536.77 3834,33 112.72 0.32 MWD 6-axis
57 9017.86 60.13 109.80 90.30 6890.07 3911.16 -1507.76 3610.34 3912,53 112.67 0.39 MWD 6-axis
58 9115.09 60.18 109.70 97.20 6938.44 3995,45 -1536.25 3689.69 3996.74 112.61 0.10 MWD 6-axis
59 9209.30 60.19 109.40 94.20 6985.28 4077,15 -1563.60 3766.71 4078.35 112.54 0.28 MWD 6-axis
60 9303.99 59.30 110.90 94.70 7032.99 4158.93 -1591.77 3843.50 4160.08 112.50 1.66 MWD 6-axis
61 9398.63 58.87 112.00 94.60 7081.60 4240.09 -1621.45 3919.04 424t ,22 112.48 1.10 MWD 6-axis
62 9493.12 58.42 112.00 94.50 7130.77 4320.78 -1651.68 3993.86 4321,92 112,47 0.48 MWD 6-axis
63 9588.10 58.50 112.00 95.00 7180.46 4401.73 -1682.01 4068.93 4402.88 112.46 0.08 MWD 6-axis
64 9680.98 58.74 112.00 92.90 7228.84 4481,04 -1711.72 4142.47 4482.19 112.45 0.26 MWD 6-axis
65 9774.65 58.82 111.80 93.70 7277.40 4561,16 -1741.61 4216,82 4562.32 112,44 0.20 MWD 6-axis
66 9867,45 59.07 112.10 92.80 7325.28 4640.65 -1771.33 4290.56 4641.82 112.43 0.39 MWD 6-axis
67 9962.28 59.37 112.10 94.80 7373.79 4722.09 -1801.97 4366.02 4723.26 112.43 0.32 MWD 6-axis
68 10057.28 59.73 111.80 95.00 7421.93 4803.98 -1832.58 4441.98 4805.16 112.42 0.47 MWD 6-axis
69 10150.46 59.67 111.70 93.20 7468.96 4884.44 -1862.40 4516.72 4885.62 112.41 0.11 MWD 6-axis
70 10245.02 60.20 11 t .40 94.50 7516.30 4966.22 -t892.44 4592.79 4967.39 112.39 0.62 MWD 6-axis
71 10339.15 60.42 111.10 94.20 7562.96 5048.06 -t922.10 4669.05 5049.21 112.38 0.36 MWD 6-axis
72 10432.17 59.31 111.10 93.00 7609.65 5128.49 -1951.05 4744.09 5129.62 112,36 1.19 MWD 6-axis
73 10527.42 59.47 111.50 95.20 7658.12 5210,42 -1980.82 4820.43 5211.54 112.34 0.40 MWD 6-axis
74 10621.34 60.39 111.50 93.90 7705.17 5291.68 -2010.60 4896.03 5292.79 112.33 0.98 MWD 6-axis
75 10714.25 59.19 111,00 92.90 7751.91 5371.96 -2039.70 4970.86 5373.06 112.31 1.37 MWD 6-axis
76 10807.15 57.32 t12.10 92.90 7800.79 5450.95 -2068.7t 5044.33 5452.05 112,30 2.25 MVVD 6-axis
77 10899.00 57.36 112.40 91.90 7850.38 5528.31 -2098.00 5115.94 5529.42 112.30 0.28 MVVD 6-axis
78 10994.62 57.63 112.80 95.60 7901.76 5608,91 -2128,99 5190,38 5610.04 112,30 0.45 MWD 6-axis
79 11087.61 57.43 112,40 93.00 7951.68 5687.34 -2159.14 5262.81 5688.50 112.31 0.42 MWD 6-axis
80 1118t .26 57.47 111.40 93.70 8002.10 5766.32 -2188,60 5336.09 5767.48 112.30 0,90 IVIWD 6-axis
81 11275,98 57.34 110.90 94,70 8053,11 5846,10 -2217,38 5410,50 5847,25 112.29 0,47 MWD 6-axis
82 11369.15 57.29 110.80 93.10 8103.39 5924.46 -2245.27 5483.73 5925.58 112.27 0.11 MWD 6-axis
83 11432.83 57.10 111.20 63.70 8137.90 5978.00 -2264.46 5533.71 5979.11 112.25 0.61 MWD 6-axis
84 11462.68 55.67 110.t0 29.90 8154.46 6002.90 -2273,24 5557.01 6004.00 112.25 5.68 MWD 6-axis
85 11493.02 53.92 110.10 30.30 8171.92 6027.65 -2281.75 5580.26 6028.74 112,24 5.78 MWD 6-axis
86 11523.42 52.50 109.10 30.40 8190.13 6051.98 -2289.92 5603.19 6053.06 112.23 5.36 MWD 6-axis
87 11555.20 50.13 108.70 31.80 8210.00 6076.79 -2297.96 5626.68 6077.84 t 12.22 7.52 MVVD 6-axis
Page 2
Schlumberger ANADRILL Survey Report
Seq Measured Incl Azimuth Course TVD Vedical Displacement Total at Azm DLS Srvy Tool
# Depth angle angle length depth section +NIS- +E/¥V- isplacement (deg/ tool quality
(fi) (deg) (deg) (fi) (ft) (fi) (ft) (ft) (fi) (deg) 1000 type type
88 t 1586.86 47.77 108.40 31.70 8230,82 6100.67 -2305.57 5649,34 6101.69 112.20 7,48 MWD 6-axis
89 11617.41 45.50 108.70 30.50 8251.76 6122.82 -2312.62 5670.36 6123.82 112.19 7.48 MWD 6-axis
90 11649.60 43.23 109.00 32.20 8274.78 6145.31 -2319.89 5691.67 6146.30 112.18 7.08 MWD 6-axis
91 11679.78 41.83 109.30 30.20 8297.03 6165.71 -2326.59 5710.95 6166.68 112.17 4.68 MWD 6-axis
92 11711.05 40.00 108.70 31.30 8320.69 6186.20 -2333.26 5730.33 6187.15 112.16 5.98 MWD 6-axis
93 11742.84 38.07 107.80 31.70 8345.31 6206.13 -2339.52 5749.29 6207.07 112,14 6.35 MVVD 6-axis
94 1 t 774.57 36.20 108.20 31.80 8370.66 6225.30 -2345.45 5767.55 6226.21 112.13 5.93 IVlWD 6-axis
95 11805.22 34.46 108.30 30.60 8395.62 6242.97 -2350.99 5784.35 6243.87 112.12 5.69 MWD 6-axis
96 11836.32 33.08 108.30 31.10 8421.47 6260.24 -2356.42 5800.76 6261.12 112.11 4.44 MWD 6-axis
97 11867.48 31.59 108.60 31.20 8447.83 6276.91 -2361.70 5816.59 6277.77 112.10 4.80 MWD 6-axis
98 11929.64 30.08 108.60 62.10 8501.16 6308.71 -2371.85 5846.76 6309.54 112.08 2.43 MWD 6-axis
99 1t992.07 29.17 t08.50 62.50 8555.48 6339.57 -2381.68 5876.05 6340.38 112.06 1.46 MWD 6-axis
100 12085.15 27.70 108.50 93.00 8637.26 6383.80 -2395.73 5918.04 6384.57 112.04 1.58 MWD 6-axis
101 12178.42 26,04 108.90 93.30 8720.49 6425.93 -2409.25 5957.99 6426.67 112.02 1.79 MWD 6-axis
102 12265.00 26.04 108.90 86.60 8798.30 6463.92 -2421.56 5993.95 6464.63 112.00 0.00 Projected M
Page 3
W-03A
DESCRIPTION OF WORK COMPLETED
Stimulation Operation
11/19/97
A Acid Stimulation Treatment was performed using the following
fluids:
SUMMARY
RIH with 3" jetting nozzle. Loaded well with 120 bbls of water. Sat down in liner
at 12436' CTMD. Cooled liner with 100 bbls of water. Jetted in 132 bbls of
12%HCL/10%Xylene across perfs. Sat down three times in liner but was able to
jet through with acid. The worst deposits were at the bottom of the perfs. Pre
acid injectivity was 1.8 bpm at 2390 psig. Post acid injectivity was 1.9 bpm at
1900 psig. Over displaced acid with 103 bbls of FSW.
Fluid Summary
123 I Fresh Seawater.
I
132 J 12% HCL/10% Xylene
33I Methanol
288 Total
LIST OF MNEMONICS FOR MRIL DATA:
Rev. 4/7/97
· MPHI - MRIL Porosity
· MPHE - MRlL Porosity (AWS designation)
· PHIMD - MRIL porosity (decimal) from Numar MRIAN processing.
· MBVI - MRIL bulk volume irreducible, max(SBVI, CBVI)
· BVIMD - MRIL bulk volume irreducible (decimal) from Numar MRIAN processing.
· MFFI - Free fluid index (does not have T1 or Hydrogen Index correction)
· FFIMD - Free fluid index (decimal) from Numar MRIAN processing.
· MBVM - Bulk Volume Moveable Fluid (MFFI corrected for T1 and Hydrogen Index)
· MCBW - Volume of clay bound water
· MPERM - MRIL permeability
· MPRM - MRIL perineability (AWS designation)
· MPHG - Gas volume from Time Domain Analysis (corrected for Hydrogen Index and TI)
· MPHO - Oil volume from Time Domain Analysis "
· MPHW - Water volmne from Time Domain Analysis "
· MGAS - Uncorrected gas volume from Time Domain Analysis
· MOlL - Uncorrected oil volume from Time Domain Analysis
· MWTR - Uncorrected water volume from Time Domain Analysis ~"
· PHIE - Effective porosity from Time Domain Analysis
· BVIL - Bulk Volume Irreducible from Time Domain Analysis
· MSIG - Porosity sum (MCBW+MBVI+MBVM)
· MPHS - Apparent porosity (MPHE+MCBW)
· ECHOxxx or Exxx - MRIL Echo amplitude for echo number xxx.
· ECHO - Amplitude of echo (array format data)
· PHASxxx or Pxxx - MRIL Phase angle corresponding to echo number xxx.
· PHAS - Phase angle of echo (array format data)
· P1PR - MRIL partial porosity bin at 0.5 ms
· P2PR - M:RlL partial porosity b;m at 1.0 ms
· P3PR - MRIL partial porosity bin at 2.0 ms
· P1 through Pxx - MRIL partial porosity (T2R) distribution bins from MAP processing.
]C OF LME )
P136 through p936 - MRIL partial porosity (T2R) distribution bins from MAP processing ( TE=3.6 ms)
BIN1 through BINxx - Summation of partial porosities (P1-Pxx) from MAP processing. For example BINi=P1,
BIN2=P l+P2, BIN3 =P l+P2+P3 etc.
· CBVWE - Bulk volume water effective from Numar MRIAN analysis
· CBVWT - Bulk volume water total from Numar MRIAN analysis
· WI - Textural parameter assuming irreducible conditions
· WW - Textural parameter assuming water wet conditions
· WQ - Textural parameter used for CBVWE computation
· PMRI - MRIL permeability from Numar MRIAN analysis, uses clay-corrected neutron-density porosity rather than
MPHI as the porosity input.
· VCLAY - Volume of dry clay from CTP processing
· VSHALE - Dry shale volume from CTP processing
· CLPHIAPP - Apparent clay porosity from CTP processing
· CLAYLINE - T2 cutoff between clay and capillal-y bound water
· BVILINE - T2 cutoff between capillary bound and free fluid
· T2 or T2GM - Transverse relaxation time ~'~
· T2xx - T2 computed frmn TE = xx ~ns
· IT2 - Inverse of T2
· D - Coefficient of diffusion
· DW - Coefficient of diffusion for bulk water Date
· RDDW - Ratio olD to DW
· SW_T2D - Water saturation from T2 and diffusion log
· SHY - Hydrocarbon saturation from T2 and diffusion log
· PORE RAD - Pore radius from T2 ,'md diffusion log
· Ti or Ti_I - Longitudinal relaxation time (TI_I refers to T1 derived froin m-exponential fitting)
· SWBM - Clay bound water saturation from MR/AN analysis
· PND - Neutron - density crossplot porosity
· CALIFLAG - Bad hole flag, typically computed using caliper and/or conventional porosity excursions.
· RT - Deep induction with borehole and invasion corrections
· GR - Gamma ray from conventional log mn
· CALl - Caliper from conventional log mn, typically from density logs
· SP - Spontaneous potential from conventional logs
· PEF - Photoelectric effect from conventional logs
· IDPH, II.D, AT90, AFg0, AO90, LLD, RILD, HDRS, DVR2, etc. - Deep resistivity froin conventional logs
· IMPH, ILM AT30, AF30, AO30, LLS, RILM, HMRS, MVR2, etc. - Medium resistivity from conventional logs
· SFLU, SFL, AT10, AFl0, AO10, MSFL, RFOC, DFL, etc. - Shallow or micro-resistivity from conventional logs
· PDSS - Density porosity using 2.65 gm/cc matrix density computed from conventional RHOB
· PDLS - Density porosity using 2.71 gm/cc matrix density computed from conventional RHOB
· PDDOL - Density porosity using 2.87 gun/cc matrix density computed from conventional RHOB
· PCNSS - Neutron porosity using sandstone matrix computed froxn conventional NPHI
· PCNLS - Neutron porosity using limestone matrix computed from conventional NPHI
· PCNDOL - Neutron porosity using dolomite matrix computed from conventional NPHI
· GAMMA - MRIL gamma ray
15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 · (281) 590-5494 · FAX: (281) 590-5495
November 20, 1.997
State of Alaska
Alaska Oil & Gas Conservation Commission
Attn.: Lori Taylor
3001 Porcupine Drive
,~mchorage, Alaska 99501
Dear Ms. Taylor:
Enclosed, please fred the following items: q ~7 '"' ]~ ?
Nine-track tape containing requested data for the Well W-03AI (logged by NUMAR)
in LIS fbrmat
List ef m,nemcv, ics for NvJk?u~~. tvLR~ data
Hard copy of tape scan
Color logs
~h~. letter has been enclosed for your records. Please sign below to
A second copy cf
acknowledge receipt oft?is package and send one copy to the following address:
BP Exploration (Alaska) Inc.
Attn.: lt~. Da,Ad W. Douglas
Petrotechnical Data Center, MB3-3
900 E. Benson Blvd.
_Amcho,.age, Alaska 99519-6612
Should you have any questions or concerns, please do not hesitate to call me.
Sincerely,
Dwayne Weaver
Enclosures
Date
O~OV £ I 1997
1 O/2O/97
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11468
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
Well Job # Log Description Date BL RF Sepia LIS Tape
C-1 STATIC PRES TEMP 970929 I 1
E-02A CET 970829 I 1
F-05 PRODUCTION PROFILE 970 911 I 1
G-03 A STATIC TEMP & PRESS SURVEY 970 929 I 1
G-23 A STATIC TEMP & PRESS SURVEY 970 929 1 1
M- 15 GAS LIFT SURVEY 97091 8 I 1
M- 30 INJECTION PROFILE 970915 I 1
M- 38 INJECTION PROFILE WARMBACK 970 91 2 I 1
P-24 FLUID COMPENSATED CBL W/GR &CCL 970 922 I 1
R- 12 TUBING PATCH RECORD 97091 3 1 1
S-32 DEFT W/PSP 97091 3 I 1
$-34 !INJECTION PROFILE 970910 I 1
W- 2 TCP CORRELATION 970827 I 1
W- 2 PLUG SE'ri'lNG RECORD 970828 I 1
W- 03 A PERFORATING RECORD 970 91 7 I 1
W- 04 PERFORATING RECORD 970907 I 1
W- 06 A PERFORATING RECORD 970909 I 1
W-18 GPJCCL JEWELRY LOG 970831 I 1
W- 23 PATCH SET RECORD 9709 02 1 1
Y-34 STATIC SURVEY 9709 21 1 I
~cj,boG
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
OCT '):.-. ''')
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received ~~ _~~~,
9/10/97
GeoQuest
500 W, International Airport Road
Anchorage, Al( 99518-1199
ATTN: Sherrie
NO. 11341
Company:
Alaska OII & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BI.. RF Sepia Tape
D-01A ~ ~'1%O_~ 97276. PEX-AIT&BHc 970529 1
D-01A - 97276 ~PEX-AIT 970529 1 ' ' 1
D-01A 97276 PEX-CNL 970529 1 1
.......
....
D-01A 97276 PEX-LDT 970529 1 1
,
D-01A 97276 BHC 970529 1 1
D- 01 A 97276 PEX-BOREHOLE PROFILE 970529 1 1
,,.
D-01A 97276 PEX-SSTVD 970529 1 1
~W-03A..-~ ~C}~ 97367 PEX-AIT, BHC & HALS-GE 970811 1
IW'03A 97367 PEX-AIT 970811 i .... 1
..
W-03A 97367 PEX-AZIMUTHAL LATEROLOG 970811 1 1
.
W-03A 97367 PEX-CNL 970811 I 1
. . ,
W-03A 97367 PEX-CNL/LDT 970811 I 1
. ,.
W-03A 97367 BHC 970811 I 1
W-03A 97367 PEX-SSTVD "' 970811 1 ' 1
,
W-03A 97367 'RFT 970812 1 1
, ,
,.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
.ec ived
9/10/97
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11338
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
Well Job # Log Description Date BL RF Sepia LIS Tape
~"~ '~ /~:>? W'03A 97399 USIT 970813 I 1
I COLOREO PRINT OF: USIT
X-16 ~-' "7<~)~ 97404 TDTP 970731 I I 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska.,,,99618-1199
Received b
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE "-
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
July 28, 1997
Dan Stoltz
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit W-03Ai
BP Exploration (Alaska) Inc.
Permit No. 97-139
Sur. Loc: 1227'SNL, 1191'WEL, Sec. 21, TllN, R12E, UM
Btmhole Loc. 1537'NSL, 315'WEL, Sec. 22, TllN, R12E, UM
Dear Mr. Stoltz:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035;
and the mechanical integrity (M/) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before
operation, and of the BOPE test performed before drilling below the surface casing shoe, must be
given so that a representative of the Coimnission may witness the tests. Notice may be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
David W.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosure
CC:
Department of Fish & Game, Habitat Section ~v/o encl.
Department of Enviromnental Conservation w/o encl.
..... -. STATE OF ALASKA
ALASKA jIL AND GAS CONSERVATION CO,,..'711SSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well []Exploratory I--IStratigraphic Test [] Development Oil
I--IRe-Entry I--IDeepenI []Service I--I Development Gas I--I Single Zone l--I Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) !10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE - 82.65 Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028263
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1227' SNL, 1191' WEL, SEC. 21, T11N, R12E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
1580' NSL, 426' WEL, SEC. 22, T11 N, R12E, UM W-03Ai
At total depth 9. Approximate spud date Amount $200,000.00
1537' NSL, 315' WEL, SEC. 22, T11N, R12E, UM 08/04/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 047451,315'I No Close Approach 2560 12771' MD /9233' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 4795' Maximum Hole Angle 60° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD ~, (include stage data)
8-1/2" 7" 26#/29# L-80 BTC-Mod 7660' 4645' 4600 12305 8795~.,, ox Class 'G' ,¥4.:7 ~.~.
6" 4-1/2" 12.6# L-80 IBT-Mod 616' 12155' 8654' 12771' 9233' 91 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations. ,_](.I/,_7' 7997
Present well condition summary
Total depth: measured 9903 feet Plugs (measured) ~8]~.OjJ .& Gas C0rls..Cqm._rri. iss~,,
true vertical 9203 feet ' ~rlc~0_Ir~g~
Effective depth: measured 9835 feet Junk (measured) 1-1/2" Camco GLV at 9912' ELM
true vertical 9089 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 110' 20" 8 cu yds 137' 137'
Surface 2664' 13-3/8" 3840 cu ft ____..,,.. ____. 2701' 2701'
Intermediate 9444' 9-5/8" 1984 cu ftORt:~i[INAL 9481' 8795'
Production
Liner 748' 5-1/2" 350 cuft 9232' - 9980' 8587' - 9203'
Perforation depth: measured 9675' - 9695', 9752' - 9794', 9804' - 9820' (three open intervals)
9670' - 9674', 9696' - 9700', 9820' - 9830' (three squeezed intervals)
true vertical subsea 8865' - 8882', 8929' - 8964', 8972' - 8986' (three open intervals
8861' - 8864', 8882' - 8886', 8986' - 8994' (three squeezed intervals)
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25,050 Requirements
Contact Engineer Name/Number: M~/ohnson, ff4-5480 Prepared By Name/Number'. Terrie Hubble, 564-4628
21.1 hereby certify that t,~e"fCegoing.~ue/a/C/d correct to the best of my knowledge
Signed //¢. ~
Dan Sto~tz /~ .t~/~//.¢ .~.~f~~ Title Senior' Drilling Engineer Date .
Commission Use Only
Permit Number I APl Number Approval Date I See cover letter
~,~-//~ ?I 50-029-21953-01 7"',,~ ~;;~" ~ ~'I for other requirements
Conditions of Approval: Samples Required I-lYes J~No Mud Log Required [~Yes []No
Hydrogen Sulfide Measures l~lYes []No Directional Survey RequiredJ~Yes [] No
Required Working Pressure for BOPE 1--12M; 1'"I3M; [~,5M; I-I10M; I-'115M
Other: 0ovid's;i'll! Signed By by order of
W.
Johnston
Approved By Commissioner the commission Date
Form 10-401 Rev. 12-01-85 Submit In Triplicate
'STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1227' SNL, 1191' WEL, SEC. 21, T11N, R12E, UM
At top of productive interval
2267' NSL, 861' EWL, SEC. 22, T11N, R12E, UM
At effective depth
2112' NSL, 931' EWL, SEC. 22, T11N, R12E, UM
At total depth
2090' NSL, 941' EWL, SEC. 22, T11N, R12E, UM
5. Type of well:
[~ Development
I--} Exploratory
[--I Stratigraphic
F--] Service
6. Datum Elevation (DF or KB)
KBE = 90.45'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
W-03
9. Permit Number
89-64
10. APl Number
50-029-21953
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured 9903 feet
true vertical 9203 feet
Effective depth: measured 9835 feet
true vertical 9089 feet
Casing Length Size
Structural
Conductor 110' 20"
Surface 2664' 13-3/8"
Intermediate 9444' 9-5/8"
Production
Liner 748' 5-1/2'
Plugs (measured)
Junk (measured) 1-1/2" Camco GLV at 9912' ELM
Cemented . ,__~. A ~
8cuyds~.~ ~ 137'
3840 cuff,-~'~ ' -- 2701'
1984 cuff _ -~. ~{ 9481'
x-
137'
2701'
8795'
8587'-9203'
Perforation depth: measured 9675' - 9695', 9752' - 9794', 9804' - 9820' (three open intervals)
9670' - 9674', 9696' - 9700', 9820' - 9830' (three squeezed intervals)
true vertical subsea 8865' - 8882', 8929' - 8964', 8972' - 8986' (three open intervals
8861' - 8864', 8882' - 8886', 8986' - 8994' (three squeezed intervals)
Tubing (size, grade, and measured depth) 4-1/2", 12.6# TDS to 9244'
Packers and SSSV (type and measured depth) 9-5/8" Baker packer at 9158'; 4-1/2" Otis SSSV at 2109'-~
13. Attachments [] Description summary of proposal I--I Detailed operations program I--] BOP sketch
14. Estimated date for commencing operation 115. Status of well classifications as: '-
[
July 22,1997
16. if proposal was verbally approved
[~Oil
Gas
I--] Suspended DUPLICATE
Service
Name of approver Date approved
contact Engineer Narne/Nurnbe~rk Johnson,/~64-548.0f/ Prepared By Name/Number:
17. I hereby certify tha/~he/C3regoing//i/~'e/~'n/d correct to the best of my knowledge
S~gned DanStoltz Title Senior Drilling Engineer
Commission Use Only
Terde Hubble, 564-4628
Conditions of Approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test~ Location clearance__
Mechanical Integrity Test ~ Subsequent form required 10 ....
Approved by order of the Commission ~ (/~ -~'~ Commissioner
Form 10-403 Rev. 06/15/88
I Approval No.~¢ ~'~/c~ ~
Date/7"-~c~-Z~
Submit In Triplicate
Well Name:
[PBU W-03Ai [
Redrill Plan Summary
I Type of Redrill (producer or injector): I Injector
Surface Location: 1227' SNL 1191' WEL S21 T11N R12E UM
Target Location: 1580' NSL 426' WEL S22 T11N R12E UM
Bottom Hole Location: 1537' NSL 315' WEL S22 T11N R12E UM
I AFE Number: 1 4P0973
I Estimated Start Date: 18/4/97 I
[MD: [ 12771'
l Well Design (conventional, slimhole, etc.):
ling: ]Nabors 18E
I Operating days to complete:
125
[TVD: 1 9233'
I mBg: [82.65' I
I Conventional Sidetrack
Objective:
Target Zone 4 oil reserves with a conventional wellbore (20 degree
inclination).
Mud Program:
Sidetrack Mud Properties: LSND 18 1/2" hole section
Density (ppg) I Funnel Vis Yield Point 10 sec gel 10 rain gel
9.4-10.4 I 40-55 3-10 4-10 15-25
I PH [FluidL°ss [
8.5-9.5 6-10cc
Production Mud Properties: Quickdril-n
Density (ppg) I Funnel vis
8.6-9.0 [ 50-65
16" hole section I
LSRV [ LSR YP
>45,000 cPI 10-20
P"
8.5-9.0
Directional:
I KOP: 14795' MD
I Maximum Hole Angle: 60°
Close Approach Well: NONE
JUL. I 1 ? 1997
.~lasl~a 0il & Gas Cons. 60mrais~-
r · Anchorage
Casing/Tubing Pro~,ram.
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MDfrVD MDfrVD
8.5" 7" 26/29# L-80 BTC-M 7660' 4645/4600 12305/8795
6" 4 1/2" 12.6# L-80 mT-M 616' 12155/8654 12771/9233
Tubing 4 1/2" 12.6# L-80 mz-M 12155' 0/0 12155/8654
Cement Calculations:
l Liner Size: 17" I
Basis:[CalCulate cement ¢olume to bring top of cement to 200' above 7" liner top han'ger using
30% open hole excess, 80' shoe joint.
Total Cement Volume: 19 Bbl 94 sxs of Class G Blend @ 1.14 ft3/sx (tail, 15.8 ppg)
220 BU 373 SXS Of Class G Blend @ 3.31 ft3/sx (lead, 11.0 ppg)
]Liner Size [4 1/2" ]
Basis:l CalCulate cement ~olume to bring top of cement to 200' above 4 1/2" liner top'hanger
I
using 30% open hole excess, 80' shoe joint.
Total Cement Volume: 19 B 91 sxs of Class G Blend @ 1.17 ft3/sx (tail, 15.8 ppg)
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
/ Drilling Hazards/Contingencies
· Gas cut mud has been observed at 4600' TVD SS (West Sak) and will be controlled with
appropriate mud weights. In addition, tight hole conditions have been encountered in the
Kingak shales at -7300 TVDSS. Mud weights as high as 10.4 ppg and the addition of
shales stabilizers may be required.
· W Pad is not an H2S pad. The highest H2S level on the pad is from W-12 at 15 ppm in
12/95.
· Losses have been encountered drilling the Sag River, Shublik and Sadlerochit
formations on other W-Pad wells. Pump LCM as necessary to control losses.
Disposal
° Cuttings Handling:
Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-
2A for injection. Haul all Class ! wastes to Pad 3 for disposal. In addition, haul all
cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which
will be sent to the North Slope Borough.
SUMMARY REDRILL PROCEDURE:
1. Move in drilling rig. Well previously P&A'd with TOC at ~9375' (planned).
2. Pull and lay down 4-1/2" tubing from jet cut at 5100' MD.
3. Set cast iron bridge plug at ~5000'. Test casing to 3500 psi for 30
minutes.
4. Mill 50' window in 9 5/8" from 4795-4845' MD. Spot cement kickoff plug.
5. Kickoff with 8 1/2" bit/MWD/GR and drill/build to 12305' MD (20' MD
below TSAG)
6. Run and cement 7" liner.
7. Drill out with 6" bit/MWD/GR and TD Zone 4 section at ~12771' MD.
8. Run and cement 4 1/2" liner.
9. Complete well with 4 1/2" L-80 IBT-mod tubing. Test. RDMO.
MOJ
7/14/97
SHARED SERVICES DRILLING
3A (P4)
i VERTICAL SECTION VIEW
RILL ~,KA-DF C Sect ion at: ~ ~ ~. ~5
I " ED TVB Scale ' , inch : ,200 feet . . :
.- ~ ~ V Oep Scale. ~ inch ~200 feet
:~)! t~7 Drawn · O~ dui ~997
JUL
'1"~ ~~] Anadn]]] Sch]umbenger
NaPkeP Identification NB BKB SECTN [NCLN
A) TIE-tN SURVEY 4783 4722 306 ~7.58
B) TOP OF ~[NDO~ 4795 4733 3~2 ~7.68
C) KOP CURVE 8/~00 4800 4737 314 ~7.73
D) END 8/~00 CURVE 52~7 5035 59B 60.08
E) DROP 12/~O0 t~652 8244 6~74 60.08
F) END ~2/100 DROP ~985 8495 6385 20.00
6) 7" CS6 PT <11 > 12305 8795 ' 6494 20.00
' H) TAR6ET ~~ ]2423 B906 6534 20.00
[) 4-~/2" LNR PNT <11 > i277t 9233 6653 80.00
J) TB 1~77~ 9233 6653 20.00
~o~ 5035'. ~ ~o 8244'
11985 D~ 12.00 /100
~52 ~=o~ ~.= ~0.0.'
~rom 8244~ ~ to ~.
From 89u~ ,v~ =o
From 8495~ ~ to
12423 12771 Dg~ ~ ~
............ :::::::::::::::::::::::::.._
III III I IIIII I IlIII I IIII IIlIIII I~
: :1 . ................. L F=E= .....
.
0 600 t200 ~800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800
Section Departure
(Anadri]] (c)97 ~03AP4 3.0C 3:~5 Phi p)
5O
..... S"HAR'EB
SERVICES DRILLTNG
iiii i i
.4nadrJ ]] Schlumberger
W-O3A (P4)
PLAN VIEW
CLOSURE · 6654 feet at Azimuth ~2 20
JSCALE ....... : 1 inch : 800 feet
,-- JDRAWN ....... : O1 Jul 1997
~ qAD~II L AK ~-DPC I .....
"' ,, ~ ~J. ~# r.' ~~ ~'~ Ir'~ Marker Identification MD N/S E/W
/-'~r~"~%.,~? ~-,.,-~ A) TIE-INSURVEY 4783 202S 250 E
B) TOP OF WINDOW 4795 205 S 255 E
C) KOP CURVE 8/~00 4800 206 S 257 E
~,IJL "J !~ D) ENDS/~OOCURVE 52~7 329S 514 E
E) DROP 12/lO0 11652 234~ S 5715 E
KB tl~lll~L ...... _ G) 7" CSG PT <11> 12305 2456 S 6013 E
.............. ~. H) TARCET ***********~, ~2423 247J S 6050 E
, 4-J/2" LNR PNT <11> J277~ 25~4 S 616! E
J)TB J277J 25~4 S 6J6! E
D
..... ,,
~_ E To'get (Rarlius
'.~.
400 0 400 800 1200 i1600 2000 2400 2800 ~200 ~600 4000 4400 4800 5200 5600 6000 6400 6800
<- ~ESl' E~SI ->
:eet)
(Anadr~l] (c)97 WO3AP4 3.0C 3:19 PM P)
Anadrill Schlumberger
Alaska District
1111 East 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 344-2160
DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING
Well ......... : W-03A (P4)
Field ........ : Prudhoe Bay, w-Pad
Computation..: Minimum Curvature
Units ........ : FEET
Surface Lat..:' 70.29701483 N
Surface Long.: 149.09263319 W
Legal Description
Surface ...... : 4053 FSL 1191 FEL
Tie-in Survey: 3851 FSL 941 FEL
Target ....... : 1580 FSL 426 FEL
BHL .......... : 1537 FSL 315 FEL
LOCATIONS - ALASKA Zone: 4
X-Coord Y-Coord
S21 TllN R12E UM 612049.01 5959030.15
S21 TllN R12E UM 612302.40 5958832.03
S22 TllN R12E UM 618135.00 5956650.00
S22 TllN R12E UM 618246.62 5956608.72
PROPOSED WELL PROFILE
STATION MEASURED INCLN DIRECTION
IDENTIFICATION DEPTH ANGLE AZIMUTH
Prepared ..... : 01 Jul 1997
Vert sect az.: 111.15
KB elevation.: 82.65 ft
Magnetic Dcln: +28.189 (E)
Scale Factor.: 0.99991426
Convergence..: +0.85425132
TIE-IN SURVEY 4783.00 27.58
TOP OF WINDOW 4795.00 27.68
KOP CURVE 8/100 4800.00 27.73
~, 4900.00 35.34
5000.00 43.08
1~3.69
123.72
123.74
119.00
115.77
ANADRILL AKA-DPC
APPROVED
JUL 01 1997
VERTICAL-DEPTHS SECTION COORDINATES-FROM
TVD SUB-SEA DEPART WELLHEAD
4722.30 4639.65 306.40 201.89 S 250.43 E
4732.93 4650.28 311.84 204.98 S 255.06 E
4737.36 4654.71 314.11 206.27 S 256.99 E
4822.54 4739.89 365.54 233.25 S 301.70 E
4899.98 4817.33 428.33 262.17 S 357.84 E
ALASKA Zone 4 TOOL DL/
X Y FACE 100
612302.40 5958832.03 8R <TIE
612307.08 5958829.01 8R 0.86
612309.03 5958827.75 20L 0.86
612354.13 5958801.44 16L 8.00
612410.69 5958773.37 14L 8.00
END 8/100 CURVE
BASE HRZ
LCU
5100.00 50.88 113.37 4968.16 4885.51 501.25 292.45 S 424.31 E
5200.00 58.73 111.45 5025.76 4943.11 582.88 323.51 S 499.82 E
5217.18 60.08 111~..15, 5034.50 4951.85 597.66 328.88 S 513.60 E
8954.11 60.08 111.1~ 6898.65 6816.00 3836.43 1497.43 S 3534.21 E
8980.17 60.08 111.15 6911.65 6829.00 3859.02 1505.58 S 3555.27 E
612477.60 5958744.09 12L 8.00
612553.55 5958714.16 llL 8.00
6125~7.41 5958708.99 HS 8.00
615604.85 5957585.70 HS 0.00
615626.03 5957577.86 MS 0.00
TOP KINGAK
10076.71 60.08 111.15 7458.65 7376.00 4809.37 1848.48 S 4441.62 E 616517.31 5957248.25 MS 0.00
(Anadrill (c)97 W03AP4 3.0C 3:14 PM iP)
W-03A (P4) 01 Jul 1997 Page 2 ~
STATION MEASURED INCLN
IDENTIFICATION DEPTH ANGLE
TJF 10834.46 60.08
TJE 11205.32 60.08
DROP 12/100 11651.51 60.08
11700.00 54.26
11800.00 42.26
11900.00 30.26
TJD 11960.66 22.98
END 12/100 DROP 11985.48 20.00
TJB 12125.85 20.00
TOP SAG RIVER 12285.48 20.00
7" CSG PT <11> 12305.48 20.00
TOP SHUBLIK 12311.02 20.00
CGOC 12398.28 20.00
TEIL 12406.79 20.00
TARGET ************* 12422.76 20.00
TOP SAD / ZONE 48 12422.76 20.00
TOP HOT 12583.45 20.00
COWC 12593.02 20.00
TOP ZONE 3 12635.59 20.00
TOP ZONE 2C 12688.80 20.00
4~i-1/2" LNR PNT <11> 12770.74 20.00
TD 12770.74 20.00
PROPOSED WELL PROFILE
DIRECTION VERTICAL-DEPTHS
AZIMUTH TVD SUB-SEA
111.15 7836.65 7754.00
111.15 8021.65 7939.00
111.15 8244.23 8161.58
111.15 8270.51 8187.86
111.15 8336.97 8254.32
SECTION
DEPART
5466.11
5787.53
6174.24
6214.97
6289.45
COORDINATES-FROM
WELLHEAD
2085.43 S 5054.12 E
2201.40 S 5353.88 E
2340.92 S 5714.55 E
2355.62 S 5752.53 E
2382.49 S 5821.99 E
111.15 8417.46 8334.81 6348.48 2403.79 S 5877.05 E
111.15 8471.65 8389.00 6375.64 2413.59 S 5902.38 E
111.15 8494.74 8412.09 6384.73 2416.87 S 5910.86 E
111.15 8626.65 8544'.00 6432.74 2434.19 S 5955.64 E
111.15 8776.65 8694.00 6487.33 2453.89 S 6006.55 E
111.15 8795.45 8712.80 6494.18 2456.36 S 6012.93 E
111.15 8800.65 8718.00 6496.07 2457.04 S 6014.70 E
111.15 8882.65 8800.00 6525.92 2467.81 S 6042.54 E
111.15 8890.65 8808.00 6528.83 2468.86 S 6045.25 E
111.15 8905.65 8823.00 6534.29 2470.83 S 6050.34 E
111.15 8905.65 8823.00 6534.29 2470.83 S 6050.34 E
111.15 9056.65 8974.00 6589.25 2490.66 S 6101.60 E
111.15 9065.65 8983.00 6592.52 2491.84 S 6104.66 E
111.15 9105.65 9023.00 6607.08 2497.09 S 6118.23 E
111.15 9155.65 9073.00 6625.28 2503.66 S 6135.21 E
111.15 9232.65 9150.00, 6653.30 2513.77 S 6161.34 E
111.15 9232.65 9150.00 6653.30 2513.77 S 6161.34 E
ALASKA Zone 4 TOOL DL/
X Y FACE 100
========= ========== ==== ====
617133.22 5957020.48 HS 0.00
617434.66 5956909.00 HS 0.00
617797.33 5956774.88 LS 0.00
617835.53 5956760.75 LS 12.00
617905.38 5956734.92 LS 12.00
617960.74 5956714.44 LS 12.00
617986.21 5956705.02 LS 12.00
617994.74 5956701.87 HS 12.00
618039.76 5956685.22 MS 0.00
618090.97 5956666.28 HS 0.00
618097.38 5956663.91 HS 0.00
618099.16 5956663.25 HS 0.00
618127.15 5956652.90 HS 0.00
618129.88 5956651.89 HS 0.00
618135.00 5956650.00 HS 0.00
618135.00 5956650.00 MS 0.00
618186.54 5956630.94 HS 0.00
618189.62 5956629.80 HS 0.00
618203.27 5956624.75 HS 0.00
618220.34 5956618.44 HS 0.00
618246.62 5956608.72 0.00
618246.62 5956608.72 0.00
(Anadrill (c)97 W03AP4 3.0C 3:14 PM P) r
ANADRILL AKA-DPC
APPROVED
jUL o 1 1997
:./
WELL PERMIT CHECKLIST COMPANY
FIELD & POOL ~,~'Z-//~,/,5'~ INIT CLASS /- ~-,..~0~.¢
WELL NAME./'~._/~---f ~.~-~/ PROGRAM:expl-'ldev/edrll~'serv~/wellboresegr-'Jann. disposal para req [-:
GEOL AREA o~.? ~ UNIT# /~"'~ ON/OFF SHORE
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
yt N
Y N
Y N
ADMINISTRATION
ENGINEERING
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
Surface casing protects all known USDWs ........... Y
CMT vol adequate to circulate on conductor & surf csg .....
CMT vol adequate to tie-in long string to surf csg ........ N
Casing designs adequate for C, T, B & permafrost ....... N
N
APPR
.,,.j -
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
DA'J'E 26.
"~/~"'Z--/'' 27.
28.
29.
Adequate tankage or reserve pit .................
If a re-drill, has a 10-403 for abandonment been approved...
Adequate wellbore separation proposed .............
If diverter required, does it meet regulations .......... ..~
Drilling fluid program schematic & equip list adequate .....
BOPEs. do they meet regulation ................
BOPE press rating appropriate; test to ~--OZ~D psig.
Choke manifold complies w/APl RP-53 (May 84) ........
Work will occur without operation shutdown ........... (
Is presence of H2S gas probable .................
GEOLOGY
.__PPR D.~,TE~
"
30. Permit can be issued w/o hydrogen sulfide measures ..... Y /,')
31. Data presented on potential overpressure zones ....... Y/,R' ,,2"(,,),/--/,
32. Seismic analysis of shallow gas zones ............. ,/Y" N ' "'
33. Seabed condition survey (if off-shore) ............. J Y N
34. Contact name/phone for weeklypro.qress reports ..... ~/. Y N
[exploratory only]
REMARKS
GEOLOGY:
ENGINEERING: COMMISSION:
JDH ? RNC -
Commentsllnstructions:
HOW/Ijt - A:\FORMS\cheklist rev 07/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
NO special effort has been made to chronologically
organize this category of information.
~' LiS READ
(NOTE: iviAXIMUM RECORD LENGTH - 819'2 BYTES)
~x REEL HEADER
REEL SEQUENCE
SERv±u~ NAME: NUi¢~R
DATE: 9'7/i2/il
ORiGiN OF DATA:
REEL Nmv~: DF
CONTiNUATiON #: 0i
PREVIOUS REE'L N~E:
CO~MENTS: PETROLEU~ COMPu,£zN~ iNu.- LiS ~O~,±,
Ua'Z~': 97'/12'/11
U~±~±~ oF' DATA:
TAPE N~¢~: BP'
CONTiNUATiON #: 0i
~R~v±OUS TAPE' N~¢~:
C~Uimvl~m'Z'~: PETROLEUM uOMPu'£±~ ±N~.- LiS F'O~¢~T
OEC 4 199 '
~~'~-~ END OF FiLE (EOF # i) ~'~~'~x
FiLE NAHdE: NUMAR
S~'v --' .......
VERSION ~: REV i.0i
DA'z'~: 97 / 12'/ii
MTM ~,~V, T ~'~7~
FiLE TYPE':
PREVIOUS FiLE NAME:
iNFORiviATiON RECORD
MNEM CONTENTS
STAT
COUN
CTRY
BP EXPLO~TiON(ALASKA), iNC.
W-03Ai:'tda p data"
PRUDHOE BAY
i227~ SNL & ii9i~ WEL AT SURFACE
ALASKA
NORTH SLOPE'
USA
50-02'9-20148-70
DATA FO~¢~T SPECiFiCATiON
ENTRY BLOCKS
TYPE SiZE REP CODE ~Nm'~'x
3 2 79 256
4 i 66 255
8 4 68 .5O
9 4 65 FT
ii 2 79 3
12 4 68 -~.zo
16 i 66 0
0 i 66
DATA ~-.m,-u~l~ ~±~ ~D~,~)
mu~ ~±am~T±UN, DOWN
DATA FRAivm ~a~±N~
UNITS OF DATA FRi~¢~ SPau±N~
ickAXiMUM FRAMES / ~a'±'a ~u~
ABSENT VALUE
~l~'±~a'£lUN BLOCK ~UD-T~
'£~mvl±NaTu~ (NO MORE ~N~'~iES)
DATum ~u±~'±~am±uN BLOCKS
N~viE ~aviu~ ~viu~ UNiT AP1 a~l a~l a~i FiLE ~ ~uu ~ a~a
iD u~~ LOG TYP CLS MOD NO. LVL uu~
~' FT 0 0 0 0 i 4 0 i 68
G~¢~ cps 0 0 0 0 i 4 0 i 68
MBVi pu 0 0 0 0 i 4 0 i 68
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
DEC
MD
mu
l~u
~..
~'U
~U
FU
FU
pu
0
O'
0
O'
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
U
0
L)
0
....,.
O
0
U
0
O'
o
o
o
o
0
o
;,%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
U
0
o
0
o
0
0
O'
0
O'
0
0
0
0
0
0
0
.~.
0
o
0
0
0
0
0
0
0
o
o
o
0
o
o'
o
0
0
~-,
0
0
0
0
0
0
0
0
O'
0
O'
0
0
0
O'
0
0
0
0
0
O'
0
0
o
0
o
O'
o
0
U
o
o
o
o
0
o
i
1
1
i
i
i
i
i
i
i
i
i
1
i
1
i
i
i
i
i
i
i
i
i
i
i
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
.,
0
0
0
0
0
O'
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
.~.
o
o
o
0
0
o
o
0
68
68
68
68'
68
68
68
68
68'
68
...- ...,..,
68
.,,- ~..,
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 01 0' 0
0 0 0 0
0 0 0' 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0' 0 0
0 0 0 0
0 O' 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
68
68
68
68'
68
68
68'
68'
68'
68
68
68
68
68
68
68
68
68
68
68
68
68
68
DATA FO~¢~T DFSUI~'iCA'i'IUm ~
TYPE ~±~ REP C0u~
3 2 /~
4 i 66
8 4 o~
9 4 65
ii 2 79
.DO
DESCRi~T±0N
u'aTa FRAME S'i~' (Dz'£~)
~0~ DiRECTiON, DOWN
DATA FRA~E SPac±NG
UNITS OF DATA FRAME SPACING
icLAXiMUM FRAMES / DATA RECORD
12' 4 68 -99'9'. 25
16 i 66 0
0 i 66
ABSENT VALUE
SPECiFICATiON BLOCK SUB-TYPE
TEPd~iNATOR (NO MORE ENTRIES)
DATUM SPECiFiCATiON BLOCKS
N~ME SERVICE SERVICE UNiT AP1 AP1 AP1 AP1 FiLE SZE'PROC' SPL REPR
iD ORDER# LOG TyP' CLSMOD NO. LVL CODE'
DEPT FT ~0 0 0
G~'~hM cps 0 0 0
MBVi pu 0 0 0
MFFi pu 0 0 0
) MPHi pu 0 0 0
·
Pi pu 0 0 0
P2 pu 0 0 0
P3 pu 0 0 0
P4 pu 0 0 0
P5 pu 0 0 0
P6 pu 0 0 0
P7 pu 0' 0 0
P8 pu 0 0 0
P9 pu 0 0 0
MCBW pu 0 0 0
~; ±i-'i~ pu 0 0 0
~' zi-'~ pu 0 0 0
~'.J~'~x pu u 0 u
MSiG pu 0 0 0
~vi pu 0 O' 0
WQ o o o
,,
Wi O' 0 0
W-W 0 0 0
~vw,~ DEC 0 0 0
SWBM DEC 0 0 0
M~-F.L uJ~u 0 0 0
PMRi MD 0 0 0
MPP~M mD 0 0 0
BiNi pU 0 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
..
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 u i o~
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68'
i 4 0 i 68
i 4 0 i 68
i 4 0 i 68
BiN3
BiN4
BiN5
BiN6
DiN7
BiN8
BiN9
BViL
Pi5
P25
P35
P45
I-'DD
P65
P85
P95
i~.JD
P45
I-'DD
P65
P4A
PU
PU
PU
PU
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
%..,
0
0
0
O'
O'
0
0
0
0
0
0
0
0
0
0
U
,.~.
U
U
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O'
0
U
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
U
0
0
0
0
0
0
0
0
0
0
0
0
U
0
0
0
0
0
O'
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
68
68
68
68
68
68
68
68
68'
68
68
68
68
68
68
68
68
.....- ~
68
~,,.,
68
~ ,,..,
~ ,,..,
~,.-,
68
,-,.,
Num. DATA
RECORDS
401
START'
DEPTH
12'200. 000
END
DEPTH
12800.000 FT'
DEPTH ~'
iNCREMENT' ~'~'
.5000
FiLE T~iLER~'
FILE N~E: NUiv~R
SERVICE N~viE: NUP~R
VERSION #: REV i.0i
DATE: 97/i2/11
PLAX. RECORD LENGTH:
Fi~ TfPE':
NEXT ~-'i~ N~ME:
1024
END OF FiLE (EOF # 2) ~'~~
TAPE' N~viE: BP
CONTiNUATiON #:
NEXT TAPE' NAME':
CO~N~ENTS: PETROLEUM COMPUTING iNC.- LiS FO'~RAT
~'~ REEL TRaiLER
SERVICE N~viE: NUIv~R
DATE: 97/12/1i
ORiGiN OF DATA:
~'~ N~ME: BP
CONTiNUATiON #: 01
NEXT REEL N~ME:
COivH~ENTS: PETROLEUM COMPUTING iNC.- LiS' FO~T
M CROFILM D
97112111
OF DATA:
ALASKA COMPUTinG CENTER
--- SCHLUMBERGER
WELL ~VA~
FIE~ ~ : W- 03A
~ OR O UGH :
STATE : NOR~ SLOpE
: S0-029.21~53
~F~CE NO : 97367 -01
* ALASKA COMPUTING CENTER *
* .
******************************
....... SCHLUMBERGER
* ............................ *
COMPANY NA~E : B.P. EXPLORATION
WELL NAFIE : W-O3A
FIELD NAM~ : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API AFJIVIBER : 50-029-21953-01
REFERENCE NO : 97367
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17.~6
PAGE:
**** REEL HEADER ****
SERVICE NA~E : EDIT
DATE : 97/09/ 8
ORIGIN : FLIC
REEL NAFiE : 97367
CONTINUATION # :
PREVIOUS REEL :
CO~IENT : B.P. EXPLORATION, W-O3A, PRUDHOE BAY, API #50-029-21953-01
**** TAPE ~ER ****
SERVICE NAM~ : EDIT
DATE : 97/09/ 8
ORIGIN : FLIC
TAPE NAME : 97367
CONTINUATION # : 1
PREVIOUS TAPE :
CO~VH~TT : B.P. EXPLORATION, W-O3A, PRUDHOE BAY, API #50-029-21953-01
TAPE HEADER
PRUDHOE BAY
OPEN HOLE WIRELINE LOGS
WELL NAM~:
API NUFiBER :
OPERA TOR :
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
W-O3A
500292195301
B.P. Exploration
SCHLUMBERGER WELL SERVICES
8-SEP~97
RUN 1
97367
BARTZ
COPEN/JACKSO
RUN 2 RUN 3
22
llN
12E
1227
1191
83.40
81.90
29.15
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6. 000 7. 000 12265.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'~.~6
3RD STRING
PRODUCTION STRING
THIS IS THE DATA FROM OH LOGS RUN Il-AUG-97. THE FIRST
RUN WAS AIT/PEX/BHC/AMS WITH REPEAT, AND THE SECOND RUN
WAS HALS/GPIT/GR WITH REPEAT. THE GPIT DATA FROM THE
SECOND RUN WAS INVALID DUE TO TOOL ERROR. THE FIRST RUN
IS THE PDC FOR THIS WELL, AND THE SECOND RUN WAS DEPTH
SHIFTED TO THE FIRST.
$
$
PAGE
**** FILE HEADER ****
FILE NAFiE : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER: 1
EDITED OPEN HOLEMAIN PASS
Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data.
DEPTH INCREFIENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH
AIT 12748.0
SDN 12730.0
CNT 12720.0
BCS 12700.0
DLL 12744.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (BiEAStrR3F~DEPTH)
BASELINE DEPTH
88888.0
12720.5
12714.5
12694.0
12684.5
12673.5
12658.0
12654.5
12648.5
12640.0
12634.5
STOP DEPTH
12270.0
12268.0
12268.0
12268.0
12272.0
.......... EQUIVALenT UNSHIFTED DEPTH ..........
DLL
88886.5
12719.0
12714.0
12697.0
12685.0
12674.0
12658.0
12653.5
12649.0
12640.5
12635.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'~.~6
PAGE:
12626.0
12622.0
12617.0
12612.5
12604.5
12595.5
12592.5
12578.0
12563.5
12558.0
12550.5
12539.5
12521.5
12506.5
12500.0
12483.5
12450.5
12411.5
12402.0
12386.5
12377.0
12373 5
12343 5
12302 0
12290 5
12280 0
12263 0
12244 0
12239 0
100 0
$
M~RGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
12626.0
12622.0
12618.0
12614.5
12606.5
12595 5
12593 0
12578 0
12563 0
12557 5
12550 5
12539.0
12521.5
12506.5
12500.0
12483.5
12450.5
12411.5
12401.5
12386.0
12376.0
12373.0
12343.0
12301.5
12290.0
12279.0
12263.0
12244.0
12239.0
100.0
RUN NO. PASS NO.
MERGE TOP MERGE BASE
THIS IS THE EDITED AND CLIPPED OPEN HOLE DATA. IT HAS
THE FIRST RUN DATA (AIT/PEX/BHC) AND THE SECOND RUN
DATA (HALS). THE HALS DATA WAS DEPTH SHIFTED TO THE RUN
ONE DATA, AS IT IS THE PDC FOR THIS WELL. ALL DATA IN
THIS FILE IS PRESENTED AT .5' SAMPLE RATE.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 l>.v6
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 120
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 8
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NA~E SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUmB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 1 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 1 1 1 4 68 0000000000
TEND AIT LB O0 000 O0 0 1 1 1 4 68 0000000000
MRES AIT OHMM O0 000 O0 0 1 1 1 4 68 0000000000
MTEMAIT DEGF O0 000 O0 0 1 1 1 4 68 0000000000
DEVI AIT DEC O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
FCNTCNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
NCNTCNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000
TNPHCNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000
DT BCS US/F O0 000 O0 0 1 1 1 4 68 0000000000
CALI SDN IN O0 000 O0 0 1 1 1 4 68 0000000000
DRHO SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
PEF SDN BN/E O0 000 O0 0 1 1 1 4 68 0000000000
RHOB SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
MSFL SDN OH~M O0 000 O0 0 1 1 1 4 68 0000000000
MINVSDN OH~ff~ O0 000 O0 0 1 1 1 4 68 0000000000
IziNOR SDN OH~M O0 000 O0 0 1 1 1 4 68 0000000000
AFiO AIT OH~M O0 000 O0 0 1 1 1 4 68 0000000000
AF20 AIT OH~iM O0 000 O0 0 1 1 1 4 68 0000000000
AF30 AIT OH~M O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17~6
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
AF60 AIT OH~ 00 000 O0 0 1 1 1 4 68 0000000000
AF90 AIT OP~ff4 O0 000 O0 0 1 1 1 4 68 0000000000
LLD DLL OH~4 O0 000 O0 0 1 1 1 4 68 0000000000
LLS DLL Ot{Pff4 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 12760.000 GR.AIT -999.250 TENS.AIT 4964.000 TEND.AIT
MRES.AIT -999.250 MTEM.AIT -999.250 DEVI.AIT -999.250 CNTC. CNT
CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT -999,250 CRAT. CNT
NRAT. CNT -999.250 NPHI.CNT -999.250 TNPH. CNT -999.250 DT. BCS
~I.SDN -999.250 DRHO.SDN -999.250 PEF. SDN -999.250 RHOB.SDN
MSFL.SDN -999.250 MINV. SDN -999,250 ~INOR.SDN -999.250 AFiO.AIT
AF20.AIT -999,250 AF30.AIT -999,250 AF60,AIT -999.250 AF90.AIT
LLD.DLL -999.250 LLS.DLL -999,250
DEPT. 12500.000 GR.AIT 26.542 TENS,AIT 5657.000 TEND.AIT
Ffl~ES.AIT 0.051 MTEM.AIT 212.933 DEVI.AIT 29.690 CNTC. CNT
CFTC. CNT 1118.375 FCNT. CNT 1048.330 NCNT. CNT 2678.899 CRAT. CNT
NRAT. CNT 2,637 NPHI.CNT 27.630 TNPH. CNT 28.073 DT. BCS
CALI.SDN 5.847 DRHO.SDN 0.030 PEF. SDN 3.264 RHOB.SDN
MSFL.SDN 0,600 MINV. SDN 0,607 MlVOR,SDN 0.486 AFiO.AIT
AF20.AIT 2,082 AF30.AIT 2.317 AF60.AIT 2,495 AF90.AIT
LLD.DLL 2.643 LLS.DLL 2,169
DEPT. 12268.000 GR.AIT 43.219 TENS.AIT 5644.000 TEND.AIT
I4RES.AIT 0.052 MTEM. AIT 204,920 DEVI.AIT 25.166 CNTC. CNT
CFTC. CNT 727.263 FCNT. CNT 699,888 NCNT. CNT 1741.149 CRAT. CNT
NRAT. CNT 2.697 NPHI. CNT 26.017 TNPH. CNT 27.196 DT. BCS
CALI.SDN 6.030 DRHO.SDN 0.060 PEF. SDN 10.000 RHOB.SDN
MSFL.SDN 0.048 MINV. SDN 0.046 ~flVOR.SDN 0.039 AFIO.AIT
AF20.AIT -999.250 AF30.AIT -999.250 AF60.AIT -999.250 AFgO.AIT
LLD.DLL -999.250 LLS.DLL -999,250
1113.104
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
1495.137
2732.746
2.439
93.500
2.313
1.564
2.493
1576.017
1738,497
2.534
54.300
2.702
-999.250
-999,250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'/. ~6
PAGE:
**** FILE HEADER ****
FILE NAFi~ : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUAIBER: 2
EDITED CASED HOLEMAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 1
DEPTH INCREMEJFr: 0.5000
FILE SU~94ARY
LDWG TOOL CODE START DEPTH
CNT 12268.0
$
BASELINE CURVE FOR SHIFTS: NONE
CURVE SHIFT DATA (MEASURED DEPTH)
STOP DEPTH
12094.0
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTED DEPTH
CNT
THIS IS THE RUN ONE DATA THAT WAS RUN INTO CASING. THE
DATA IS EDITED FOR ONLY THE CURVES VALID THROUGH CASING
THIS DATA IS PRESENTED AT .5' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SETTYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17~6
PAGE:
TYPE REPR CODE VALUE
8 68 0.5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~IE SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 2 1 1 4 68 0000000000
HTENAIT LB O0 000 O0 0 2 1 1 4 68 0000000000
MTEgIAIT DEGF O0 000 O0 0 2 1 1 4 68 0000000000
GRCHAIT GAPI O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CArT CPS O0 000 O0 0 2 1 1 4 68 0000000000
RCFT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000
RCNTCNT CPS O0 000 O0 0 2 1 1 4 68 0000000000
CRATClFT O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000
TNPH CNT
PU-S O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 12268.000 TENS.AIT 5644.000 HTEN.AIT 1576.017 MTE~.AIT
GRCH.AIT 43.219 CNTC. CNT 1738.497 CFTC. CNT 727.263 RCFT. CNT
RCNT. CNT 1741.149 CP~T. CNT 2.534 NRAT. CNT 2.697 NPHI.CNT
TNPH. CNT 27.196
DEPT. 12094.000 TENS.AIT 5572.000 HTEN. AIT 1505.985 MTEM. AIT
GRCH.AIT -999.250 CNTC. CNT -999.250 CFTC. CNT -999.250 RCFT. CNT
RCNT. CNT -999.250 CRAT. CNT -999.250 NRAT. CNT -999.250 NPHI.CNT
TNPH. CNT -999.250
204. 920
699. 888
26. 017
195.146
-999.250
-999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17~6
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION . O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE . FLIC
VERSION · O01CO1
DATE · 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 3
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN AFUMiBER: 1
TOOL STRING NUM~ER: 1
1
0.5000
PASS DTJMBER :
DEPTH INCREMENT:
FILE Sb?4MARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
AITH 12748.0 12268.0
PEX 12730.0 12268.0
BHC 12700.0 12268.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TI~4E CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPER) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
11 -AUG-97
8C0609
800 lO-AUG-97
30 11 -AUG-97
12750.0
12750.0
12268.0
12740.0
1800.0
TOOL NUMBER
...........
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17~v6
PAGE:
AITH ARRAY INDUCTION
PEX DENS./NEUT.
GR GAMMA RAY
BHC BHC SONIC
AMS AUX. MEAS. SONDE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OHP~4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
AITH
HRDD
HGNS
SDT- C
AMS - A
6. 000
12265.0
12268.0
QUIKDRILN- KCL
8.90
49.0
8.5
214.0
0.113 73.0
O. 106 74.0
0.324 74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) '.
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): O. 1
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
**** THIS IS THE RAW DATA AT .5' SAMPLE RATE ****
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'/~ ~6
PAGE:
10
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 136
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 7
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NANiE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUtCB SAMP ELEbI CODE (HEX)
DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 3 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 3 1 1 4 68 0000000000
HTENAIT LB O0 000 O0 0 3 1 1 4 68 0000000000
I~LES AIT Otff4~ O0 000 O0 0 3 1 1 4 68 0000000000
14TEMAIT DEGF O0 000 O0 0 3 1 1 4 68 0000000000
GDEVAIT DEG O0 000 O0 0 3 1 1 4 68 0000000000
CNTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
CFTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
RCFT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
RCNT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
TNRA PEX O0 000 O0 0 3 1 1 4 68 0000000000
RTNR PEX O0 000 O0 0 3 1 1 4 68 0000000000
TNPH PEX PU O0 000 O0 0 3 1 1 4 68 0000000000
NPHI PBX PU O0 000 O0 0 3 1 1 4 68 0000000000
NPOR PEX PU O0 000 O0 0 3 1 1 4 68 0000000000
DT BHC US/F O0 000 O0 0 3 1 1 4 68 0000000000
TT1 BHC US O0 000 O0 0 3 1 1 4 68 0000000000
TT2 BHC US O0 000 O0 0 3 1 1 4 68 0000000000
TT3 BHC US O0 000 O0 0 3 1 1 4 68 0000000000
TT4 BHC US O0 000 O0 0 3 1 1 4 68 0000000000
HCAL PEX IN O0 000 O0 0 3 1 1 4 68 0000000000
RHOZ PEX G/C3 O0 000 O0 0 3 1 1 4 68 0000000000
PZDRA PEX G/C3 O0 000 O0 0 3 1 1 4 68 0000000000
PEFZ PEX BN/E O0 000 O0 0 3 1 1 4 68 0000000000
DPHZ PEX PU O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17.~6
PAGE:
11
NAIVE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
H~IN PEX OP~4~ O0 000 O0 0 3 1 1 4 68 0000000000
H~iNO PEX OH~IM O0 000 O0 0 3 1 1 4 68 0000000000
RXOZ PEX OH~q O0 000 O0 0 3 1 1 4 68 0000000000
AFiO AIT OP~Vk4 O0 000 O0 0 3 1 1 4 68 0000000000
AF20 AIT OH~ O0 000 O0 0 3 1 1 4 68 0000000000
AF30 AIT OH~ O0 000 O0 0 3 1 1 4 68 0000000000
AF60 AIT OH~4~ O0 000 O0 0 3 1 1 4 68 0000000000
AFgO AIT OI{M~ O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 12760.000 GR.AIT 45.274 TENS.AIT 4964.000 HTEN.AIT
FiRES.AIT 0.051 MTEM.AIT 213.932 GDEV. AIT -999.250 CNTC. PEX
CFTC. PEX 1538.318 RCFT. PEX 1411.926 RCNT. PEX 3008.232 TNRA.PEX
RTNR.PEX 2.120 TNPH. PEX 21.487 NPHI.PEX 23.608 NPOR.PEX
DT.BHC 78.600 TT1.BHC 492.000 TT2.BHC 331.600 TT3.BHC
TT4.BHC 336.800 HCAL.PEX 3.921 RHOZ. PEX 2.221 HDRA.PEX
PEFZ.PEX 3.239 DPHZ.PEX 26.022 H~IN. PEX 0.187 H~NO.PEX
RXOZ.PEX 0.678 AFiO.AIT 1.465 AF20.AIT 1.774 AF30.AIT
AF60.AIT 1.990 AF90.AIT 2.331
DEPT. 12500.000 GR.AIT 26.542 TENS.AIT 5657.000 HTEN. AIT
I~°~ES.AIT 0.051 MTEM.AIT 212.933 GDEV. AIT 29.690 CNTC. PEX
CFTC. PEX 1118.375 RCFT. PEX 1048.330 RCNT. PEX 2678.899 TNRA.PEX
RTNR.PEX 2.637 TNPH. PEX 28.073 NPHI.PEX 28.119 NPOR.PEX
DT. BHC 93.500 TT1.BHC 570.400 TT2.BHC 382.800 TT3.BHC
TT4.BHC 387.600 HCAL.PEX 5.847 RHOZ. PEX 2.313 HDRA.PEX
PEFZ.PEX 3.264 DPHZ.PEX 20.411 HI~IN. PEX 0.607 H~NO.PEX
RXOZ.PEX 0.600 AFiO.AIT 1.564 AF20.AIT 2.082 AF30.AIT
AF60.AIT 2.495 AF90.AIT 2.493
DEPT. 12268.000 GR.AIT 43.219 TENS.AIT
MRES.AIT 0.052 MTEM. AIT 204.920 GDEV. AIT
CFTC.PEX 727.263 RCFT.PEX 699.888 RCNT. PEX
RTNR.PEX 2.697 TNPH.PEX 27.196 NPHI. PEX
DT. BHC 54.300 TT1.BHC 409.200 TT2.BHC
TT4.BHC 296.800 HCAL.PEX 6.030 RHOZ. PEX
PEFZ.PEX 10.000 DPHZ.PEX -3.156 H~4IN. PEX
RXOZ.PEX 0.048 AFiO.AIT 1950.000 AF20.AIT
AF60.AIT 9.291 AF90.AIT 15.585
5644 000
25 166
1741 149
29 380
295 200
2 702
0.046
1950.000
HTEN. AIT
CNTC. PEX
TNRA. PEX
NPOR. PEX
TT3. BHC
HDRA. PEX
H~NO. PEX
AF30. AIT
1113 104
3080 560
2 022
21 229
490 800
0 430
0 268
1 835
1495.137
2732. 746
2.439
27. 630
571. 600
O. 030
0.486
2.317
1576. 017
1738.497
2.534
26. 017
407. 600
O. 060
O. 039
1950. 000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17 ~ 06
PAGE:
12
FILE TRAILER ****
FILE NA~E : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NANIE : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUM~ER 4
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING ~ER: 2
PASS NUMBER: 2
DEPTH INCREMF2Fr: 0.5000
FILE SUM~LARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
12744.0 12268.0
HALS
LOG HEADER DATA
DATE L~ED : 11 -AUG- 97
SOFTWARE VERSION: 8C0609
TIME CIRCULATION ENDED: 800 lO-AUG-97
TIME LOGGER ON BOTTOM: 30 il-AUG-97
TD DRILLER (FT): 12750.0
TD LOGGER (FT) : 12750.0
TOP LOG INTERVAL (FT) : 12268.0
BOTTOM LOG INTERVAL (FT) : 12740.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
HALS AZIM LATEROLOG
$
TOOL NUMBER
HALS
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17:06
PAGE:
13
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
6.000
12265.0
12268.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~) AT TEMPERATURE (DEGF) :
MUD AT f~EASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
QUIKDRILN-KCL
8.90
49.0
8.5
214.0
O. 113 73.0
0.106 74.0
O. 324 74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
* THIS IS THE SECOND RUN DATA AT .5' SAMPLE RATE**
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALO-E
1 66 0
2 66 0
3 73 20
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17:06
PAGE: 14
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000
HLLDDLL OH~I O0 000 O0 0 4 1 1 4 68 0000000000
HLLS DLL 011~I O0 000 O0 0 4 1 1 4 68 0000000000
HRLDDLL OH~I O0 000 O0 0 4 1 1 4 68 0000000000
HRLS DLL OH~4 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 12744.000 HLLD.DLL
HRLS.DLL 1.623
DEPT. 12500.000 HLLD.DLL
HRLS.DLL 2.228
DEPT. 12268.000 HLLD.DLL
HRLS.DLL 1.222
1.715 HLLS.DLL 1.490 HRLD.DLL 1.842
2.643 HLLS.DLL 2.169 HRLD.DLL 2.697
0.100 HLLS.DLL
0.100 HRLD.DLL 60000.000
** END OF DATA **
**** FILE TRAILER ****
FILE NA~E : EDIT .004
SERVICE · FLIC
VERSION ' 001C01
DATE - 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17:06
PAGE:
15
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION . O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUM~ER 5
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String ~1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN ATUM~ER: 1
TOOL STRING NUM~ER: 1
PASS NIIM~ER: 1
DEPTH INCREMENT: 0..2500
FILE S~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
12748.0 12268.0
AIT
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
AITH ARRAY INDUCTION
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
11 -AUG-97
8C0609
800 lO-AUG-97
30 11 -AUG-97
12750.0
12750.0
12268.0
12740.0
TOOL NUMBER
AITH
6.000
12265.0
12268.0
QUIKDRILIV-KCL
8.90
49.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17:o6
PAGE:
16
MUD PH: 8.5
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF): 214.0
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) :
MUD AT f4~ASURED TEMPERATURE (MT): 0.113
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): 0.106
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 324
MUD CAKE AT (BHT):
73.0
74.0
74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMzARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
*** THIS IS RUN 1 RAW DATA AT .25' SAMPLE RATE***
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13- 66 0
14 65 FT
15 66 68
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17:~6
PAGE: 17
TYPE REPR CODE VALUE
16 66 1
0 66 1
** SET TYPE - CHAiV **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000
AFiO AIT OH~ O0 000 O0 0 5 1 1 4 68 0000000000
AF20 AIT OH~ O0 000 O0 0 5 1 1 4 68 0000000000
AF30 AIT OH~4~ O0 000 O0 0 5 1 1 4 68 0000000000
AF60 AIT OH~ O0 000 O0 0 5 1 1 4 68 0000000000
AF90 AIT OHT4~ O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 12760.000 AFiO.AIT 1.465 AF20.AIT
AF6OoAIT 1.990 AF90.AIT 2.331
1.774 AF30.AIT 1.835
DEPT. 12500.000 AFiO.AIT 1.564 AF20.AIT
AF6OoAIT 2.495 AF90.AIT 2.493
DEPT.
AF60.AIT
2.082 AF30.AIT 2.317
12268.000 AFiO.AIT 1950.000 AF20.AIT 1950.000 AF30.AIT 1950.000
9.291 AF90.AIT 15.585
** END OF DATA **
**** FILE TRAILER ****
FILE NAlViE : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17:06
PAGE:
18
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUM~ER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUM~n~Y
FILE HEADER
FILENUM~ER 6
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
1
1
1
0.1667
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 12730.0 12268.0
BHC 12700.0 12268.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIf4~ LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX DENS./NEUT.
BHC BHC SONIC
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
Il-AUG-97
8C0609
800 lO-AUG-97
30 Il-AUG-97
12750.0
12750.0
12268.0
12740.0
TOOL NUMBER
HRDD
SDT-C
6.000
12265.0
12268.0
QUIKDRILN- KCL
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1, J6
PAGE:
19
MUD DENSITY (LB/G): 8.90
MUD VISCOSITY (S) : 49.0
MUD PH: 8.5
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) : 214.0
RESISTIVITY (OH~) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): O. 113
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): 0.106
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 324
MUD CAKE AT (BHT) :
73.0
74.0
74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
*** THIS IS THE RAW RUN 1 DATA AT .1667' SAMPLE RATE**
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 48
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 21
12 68
13 66 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1, . ~6
PAGE:
2O
TYPE REPR CODE VALUE
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NACRE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 6 1 1 4 68 0000000000
RHOZ PEX G/C3 O0 000 O0 0 6 1 1 4 68 0000000000
PiDRAPE~ G/C3 O0 000 O0 0 6 1 1 4 68 0000000000
PEFZ PEX BN/E O0 000 O0 0 6 1 1 4 68 0000000000
DPHZ PEX PU O0 000 O0 0 6 1 1 4 68 0000000000
H~IN PEX OH~I O0 000 O0 0 6 1 1 4 68 0000000000
H~NO PEX OPff4M O0 000 O0 0 6 1 1 4 68 0000000000
RXOZ PEX OHI~M O0 000 O0 0 6 1 1 4 68 0000000000
TT1 BHC US O0 000 O0 0 6 1 1 4 68 0000000000
TT2 BHC US O0 000 O0 0 6 1 1 4 68 0000000000
TT3 BHC US O0 000 O0 0 6 1 1 4 68 0000000000
TT4 BHC US O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 12760. 000 RHOZ.PEX 2.221 HDRA.PEX O. 430 PEFZ.PEX
DPHZ.PEX 26.022 HMIN. PEX 0.187 H~4NO.PEX 0.268 RXOZ.PEX
TT1 .BHC 492. 000 TT2.BHC 331. 600 TT3 .BHC 490. 800 TT4. BHC
DEPT. 12500.000 RHOZ.PEX 2.313 HDRA.PEX 0.030 PEFZ.PEX
DPHZ.PEX 20.411 H~IN. PEX 0.607 tff4NO.PEX 0.486 RXOZ.PEX
TT1.BHC 570.400 TT2.BHC 382.800 TT3.BHC 571.600 TT4.BHC
DEPT. 12268.000 RHOZ.PEX 2.702 HDRA.PEX 0.060 PEFZ.PEX
DPHZ.PEX -3.156 HMIN. PEX 0.046 H~flVO.PEX 0.039 RXOZ.PEX
TT1.BHC 409.200 TT2.BHC 295.200 TT3.BHC 407.600 TT4.BHC
3.239
0.678
336.800
3.264
0.600
387.600
10.000
0.048
296.800
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1,.~6
PAGE:
21
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE IVU~I~ER 7
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: O . 0833
FILE S~Y
VFJTDOR TOOL CODE START DEPTH STOP DEPTH
12730.0 12268.0
PEX
LOG HEADER DATA
DATE LOGGED: Il-AUG-97
SOFTWARE VERSION: 8C0609
TIf4E CIRCULATION ENDED: 800 lO-AUG-97
TII~E LOGGER ON BOTTOM: 30 il-AUG-97
TD DRILLER (FT) : 12750.0
TD LOGGER (FT) : 12750.0
TOP LOG INTERVAL (FT) : 12268.0
BOTTOM LOG INTERVAL (FT) : 12740.0
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX DENSITY
$
TOOL NUMBER
HRDD
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1, . ~6
PAGE:
22
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
6. 000
12265.0
12268.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3) '.
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
QUIKDRILN- KCL
8.90
49.0
8.5
214.0
0.113
0.106
O. 324
73.0
74.0
74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
** THIS ID THE RAW RUN 1 DATA AT . 0833' SAMPLE RATE **
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1, . ~6
PAGE:
23
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA_~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUA~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 7 1 1 4 68 0000000000
HCAL PEX IN O0 000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 12760.000 HCAL.PEX 3.921
DEPT. 12500.000 HCAL.PEX 5.847
DEPT. 12268.000 HCAL.PEX 6.030
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE · 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1,_~6
PAGE:
24
**** FILE HEADER ****
FILE NAFIE : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUIB~ER 8
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 2
PASS NUMBER: 2
DEPTH INCREFiFIVT: 0.1667
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
12744.0 12268,0
HALS
LOG HEADER DATA
DATE LOGGED: il-AUG-97
SOFTWARE VERSION: 8C0609
TIME CIRCULATION ENDED: 800 lO-AUG-97
TIME LOGGER ON BOTTOM: 30 il-AUG-97
TD DRILLER (FT) : 12750.0
TD LOGGER (FT) : 12750.0
TOP LOG INTERVAL (FT) : 12268.0
BOTTOM LOG INTERVAL (FT) : 12740.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
HALS AZIM. LATEROLOG
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G)
MUD VISCOSITY (S) :
TOOL NUMBER
HALS
6.000
12265.0
12268.0
QUIKDRILN-KCL
8.90
49.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1~.~6
PAGE: 25
MUD PH: 8.5
FLUID LOSS (C3):
MAXIMQ-M RECORDED TEMPERATURE (DEGF) : 214.0
RESISTIVITY (OH~) AT TEMPERATURE (DEGF) :
MUD AT f4~ASURED TEMPERATURE (MT): 0.113
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): 0.106
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 324
MUD CAKE AT (BHT):
73.0
74.0
74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
** THIS IS THE RAW RUN 2 DATA AT .1667' SAMPLE RATE **
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VAI~UE
1 66 0
2 66 0
3 73 20
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'~.~6
PAGE: 26
TYPE REPR CODE VALUE
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 8 1 1 4 68 0000000000
HLLDDLL OH~M O0 000 O0 0 8 1 1 4 68 0000000000
HLLS DLL OH~ O0 000 O0 0 8 1 1 4 68 0000000000
HRLDDLL OH~ O0 000 O0 0 8 1 1 4 68 0000000000
HRLS DLL OHFff~ O0 000 O0 0 8 1 1 4 68 0000000000
** DATA **
DEPT. 12768.000
HRLS.DLL 1.502
DEPT. 12500.000
HRLS.DLL 2.228
DEPT. 12268.000
HRLS.DLL 1.222
HLLD.DLL 1.735 HLLS.DLL 1.498 HRLD.DLL
HLLD.DLL 2.643 HLLS.DLL 2.169 HRLD.DLL
HLLD.DLL 0.100 HLLS.DLL 0.100 HRLD.DLL
1. 713
2.697
60000.000
** END OF DATA **
**** FILE TRAILER ****
FILE NA~E : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E : EDIT .009
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'~ . ~6
PAGE:
27
FILE HEADER
FILE NUMBER 9
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NU~ER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 2
DEPTH INCREM~aVT: O. 5000
FILE SU~UL~Y
VENDOR TOOL CODE START DEPTH
PEX 12730.0
BHC 12700.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIM~ CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
12440.0
12420.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX DENS./NEUT.
BHC BHC SONIC
AMS AUX. MEAS. SONDE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
11 -AUG-97
8C0609
800 lO-AUG-97
30 11 -AUG-97
12750.0
12750.0
12268.0
12740.0
1800.0
TOOL NUMBER
...........
HRDD
SDT-C
AMS-A
6.000
12265.0
12268.0
QUIKDRILN-KCL
8.90
49.0
8.5
214.0
O. 113 73.0
0.106 74.0
0.324 74.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1~6
PAGE:
28
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): 0.1
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
** THIS IS THE RUN 1 REPEAT DATA AT .5' SAMPLE RATE **
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 68
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 15
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 9 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 9 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1, ~ ~6
PAGE:
29
NA~E SERVUNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
TENS AIT LB O0 000 O0 0 9 1 1 4 68 0000000000
HTENAIT LB O0 000 O0 0 9 1 1 4 68 0000000000
~fRES AIT OH~ O0 000 O0 0 9 1 1 4 68 0000000000
MTEMAIT DEGF O0 000 O0 0 9 1 1 4 68 0000000000
GDEVAIT DEG O0 000 O0 0 9 1 1 4 68 0000000000
CNTC PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
CFTC PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
RCFT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
RCNTPEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
TNRA PEX O0 000 O0 0 9 1 1 4 68 0000000000
RTArR PEX O0 000 O0 0 9 1 1 4 68 0000000000
TNPH PEX PU O0 000 O0 0 9 1 1 4 68 0000000000
NPHI PEX PU O0 000 O0 0 9 1 1 4 68 0000000000
NPOR PEX PU O0 000 O0 0 9 1 1 4 68 0000000000
DT BHC US/F O0 000 O0 0 9 1 1 4 68 0000000000
** DATA **
DEPT. 12774.000 GR.AIT 40.243 TENS.AIT 3247.000 HTEN.AIT
f4RES.AIT 0.061 MTEM. AIT 213.894 GDEV. AIT -999.250 CNTC.PEX
CFTC.PEX 1504.738 RCFT. PEX 1381.675 RCNT. PEX 3023.889 TNRA.PEX
RTNR.PEX 2.178 TNPH. PEX 22.322 NPHI.PEX 24.535 NPOR.PEX
DT. BHC 78.800
DEPT. 12500.000 GR.AIT 28.643 TENS.AIT 5529.000 HTEN.AIT
FiRES.AIT 0.059 MTEM. AIT 212.353 GDEV. AIT 29.424 CNTC.PEX
CFTC.PEX 1234.361 RCFT. PEX 1115.061 RCNT. PEX 2794.387 TNRA.PEX
RTNR.PEX 2.470 TNPH. PEX 26.448 NPHI.PEX 26.960 NPOR.PEX
DT. BHC 92.800
DEPT. 12417.000 GR.AIT 78.212 TENS.AIT 5753.000 HTEN. AIT
F~ES.AIT 0.061 MTE~.AIT 210.168 GDEV. AIT 27.038 CNTC. PEX
CFTC.PEX 1393.709 RCFT. PEX 1647.622 RCNT. PEX 3467.839 TNRA.PEX
RTNR.PEX 2.261 TNPH. PEX 24.788 NPHI.PEX 25.829 NPOR.PEX
DT. BHC 79.100
674.009
3096.728
2.077
22.060
1497.570
2888.576
2.368
26.482
1563.098
3111.731
2.290
24.416
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1,.~6
PAGE:
3O
**** FILE TRAILER ****
FILE NA~E : EDIT .009
SERVICE : FLIC
VERSION . O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E .. EDIT . O10
SERVICE : FLIC
VERSION : O01CO1
DATE · 97/09/ 8
MAX REC SIZE .. 1024
FILE TYPE .. LO
LAST FILE
FILE HEADER
FILENUMBER 10
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 1
TOOL STRING NU~BER: 1
PASSNUMBER: 2
DEPTH INCRt~!ENT: 0.2500
FILE SOY4NARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
12746.0 12513.0
AIT
$
LOG HEADER DATA
DATE LOGGED: il-AUG-97
SOFTWARE VERSION: 8C0609
TIME CIRCULATION ENDED: 800 10-AUG-97
TIME LOGGER ON BOTTOM: 30 Il-AUG-97
TD DRILLER (FT) : 12750.0
TD LOGGER (FT) : 12750.0
TOP LOG INTERVAL (FT) : 12268.0
BOTTOM LOG INTERVAL (FT) : 12740.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
AITH ARRAY INDUCTION
$
BOREHOLE AND CASING DATA
TOOL NUMBER
AITH
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 l~.v6
PAGE:
31
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
6.000
12265.0
12268.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OHT~f) AT TEMPERATURE (DEGF) :
MUD AT F~AS~ TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
QUIKDRILN- KCL
8.90
49.0
8.5
214.0
0.113 73.0
0.106 74.0
O. 324 74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REFiARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO . 75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
**THIS IS THE RUN 1 REPEAT DATA AT .25' SAMPLE RATE**
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1~.~6
PAGE: 32
TYPE REPR CODE VALUE
7 65
8 68 0.25
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT O0 000 O0 0 10 1 1 4 68 0000000000
AFiO AIT OH~ O0 000 O0 0 10 1 1 4 68 0000000000
AF20 AIT OH~ O0 000 O0 0 10 1 1 4 68 0000000000
AF30 AIT Oh?4~ O0 000 O0 0 10 1 1 4 68 0000000000
AF60 AIT OH~ O0 000 O0 0 10 1 1 4 68 0000000000
AF90 AIT OHT4M O0 000 O0 0 10 1 1 4 68 0000000000
** DATA **
DEPT. 12774.000 AFiO.AIT 1.353 AF20.AIT
AF60.AIT 2.021 AF90.AIT 2.288
DEPT. 12500.000 AFiO.AIT 2.069 AF20.AIT
AF60.AIT 3.387 AF90.AIT 3.341
DEPT. 12417.250 AFiO.AIT 2.069 AF20.AIT
AF60.AIT 3.387 AF90.AIT 3.341
1.786 AF30.AIT
2.848 AF30.AIT
2.848 AF30.AIT
1. 846
3. 098
3. 098
** END OF DATA **
**** FILE TRAILER ****
FILE NAFZE : EDIT .010
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'~.~6
PAGE: 33
**** FILE HEADER ****
FILE NAME : EDIT .011
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUM~ER 11
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 1
TOOL STRING NUM~ER: 1
PASS NUMBER: 2
DEPTH INCREFIENT: 0.1667
FILE SD?4MARY
VENDOR TOOL CODE START DEPTH
PEX 12728.0
BHC 12700.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TI~ CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
..........
12440.0
12422.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX DENS./NEUT.
GR GAM2~A RAY
BHC BHC SONIC
AMS AUX. MEAS. SONDE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
11 -AUG- 97
8C0609
800 lO-AUG-97
30 11 -AUG-97
12750.0
12750.0
12268.0
12740.0
TOOL NUMBER
HRDD
HGNS
SDT-C
AM$- A
6.000
12265.0
12268.0
QUIKDRILN-KCL
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1~.~6
PAGE:
34
MUD DENSITY (LB/G): 8.90
~ VISCOSITY (S): 49.0
MUD PH: 8.5
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) : 214.0
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF):
MUD AT 14EASURED TEMPERATURE (MT): O. 113
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): 0.106
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 324
MUD CAKE AT (BHT) :
73.0
74.0
74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
**THIS IS THE RUN 1 REPEAT DATA AT .1667 SAMPLE RATE**
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 23
12 68
13 66 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1>.~6
PAGE: 35
TYPE REPR CODE VALUE
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN**
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 11 1 1 4 68 0000000000
RHOZ PEX G/C3 O0 000 O0 0 11 1 1 4 68 0000000000
HDRA PEX G/C3 O0 000 O0 0 11 1 1 4 68 0000000000
PEFZ PEX BN/E O0 000 O0 0 11 1 1 4 68 0000000000
HMIN PEX OH~4~ O0 000 O0 0 11 1 1 4 68 0000000000
H~VO PEX OH~ O0 000 O0 0 11 1 1 4 68 0000000000
TT1 BHC US O0 000 O0 0 11 1 1 4 68 0000000000
TT2 BHC US O0 000 O0 0 11 1 1 4 68 0000000000
TT3 BHC US O0 000 O0 0 11 1 1 4 68 0000000000
TT4 BHC US O0 000 O0 0 11 1 1 4 68 0000000000
RXOZ PEX O~ O0 000 O0 0 11 1 1 4 68 0000000000
** DATA **
DEPT. 12774.000 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX -999.250
H~IN. PEX 0.187 H~INO.PEX 0.172 TT1.BHC 490.000 TT2.BHC 332.800
TT3.BHC 491.200 TT4.BHC 333.200 RXOZ.PEX 0.191
DEPT. 12500.000 RHOZ.PEX 2.308 HDRA.PEX 0.016 PEFZ.PEX 3.255
HMIN. PEX 0.743 Pi~VO.PF2f 0.584 TT1.BHC 570.800 TT2.BHC 383.200
TT3.BHC 571.600 TT4.BHC 388.800 RXOZ.PEX 0.786
DEPT. 12417.334 RHOZ.PEX 2.295 PiDRA.PEX 0.005 PEFZ.PEX 2.532
PiMIN. PEX 0.960 HFINO.PEX 0.815 TT1.BHC 503.200 TT2.BHC 337.200
TT3.BHC 504.400 TT4.BHC 341.200 RXOZ.PEX 1.624
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1
PAGE:
36
**** FILE TRAILER ****
FILE NAM~ : EDIT .011
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NANiE : EDIT .012
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 12
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string,
RUN~ER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 2
DEPTH INCREFIFa%r~: 0.08333
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 12728.0 12440.0
$
LOG HEADER DATA
DATE LOGGED: il-AUG-97
SOFTWARE VERSION: 8C0609
TIME CIRCULATION ENDED: 800 lO-AUG-97
TIME LOGGER ON BOTTOM: 30 il-AUG-97
TD DRILLER (FT) : 12750.0
TD LOGGER (FT) : 12750.0
TOP LOG INTERVAL (FT) : 12268.0
BOTTOM LO~ INTERVAL (FT): 12740.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX DENSITY
$
BOREHOLE AND CASING DATA
and run in separate files.
TOOL NUMBER
HRDD
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1~.~6
PAGE:
37
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
6.000
12265.0
12268.0
QUIKDRILN- KCL
8.90
49.0
8.5
214.0
0.113 73.0
O. 106 74.0
0.324 74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
**THIS IS THE RUN 1 REPEAT DATA AT .0833' SAMPLE RATE**
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1, . ~6
PAGE:
38
TYPE REPR CODE VALUE
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 12 1 1 4 68 0000000000
HCAL PEX IN O0 000 O0 0 12 1 1 4 68 0000000000
** DATA **
DEPT. 12774.000 HCAL.PEX 3.807
DEPT. 12500.000 HCAL.PEX 5.950
DEPT. 12417.084 HCAL.PEX 5.969
** END OF DATA **
**** FILE TRAILER ****
FILE NAi~E : EDIT .012
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1'/ . ~6
PAGE:
39'
**** FILE HEADER ****
FILE NAME : EDIT .013
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 13
RmlW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUM~ER: 1
TOOL STRING NUM~ER: 2
PASS NUMBER: 2
DEPTH INCREM~2FT: 0.1667
FILE SO?4~zARY
VENDOR TOOL CODE START DEPTH
HALS 12744.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIFiE CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TI) LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
STOP DEPTH
12537.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
HALS AZIM. LATEROLOG
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
11 -AUG-97
8C0609
800 lO-AUG-97
30 11 -AUG-97
12750.0
12750.0
12268.0
12740.0
TOOL NUMBER
HALS
6. 000
12265.0
12268.0
QUIKDRILN-KCL
8.90
49.0
8.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1¥ . ~6
PAGE:
4O
MAXII4UM RECORDED TEMPERATURE (DEGF) : 214.0
RESISTIVITY (Ot{M~I) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT) .. O. 113
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): O. 106
MUD FILTRATE AT (BHT):
MUD CAKE AT (MT): 0. 324
MUD CAKE AT (BHT) :
73.0
74.0
74.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: LOGS RUN ON MARKED LINE - PDC LOG FOR THIS WELL
19' OF STRETCH ADDED AT TD
FOUR .5" STANDOFFS ON SONIC, TWO .5" ON AIT
TWO .75" STANDOFFS RUN ON HALS
SANDSTONE MATRIX USED
FIRST RUN AIT/PEX/BHC/GR
SECOND RUN HALS/GR
TOOL TURNERS RUN ON NUCLEAR TOOLS
**THIS IS THE RUN 2 REPEAT DATA AT .1667' SAMPLE RATE**
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 20
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1, . ~6
PAGE:
41
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 13 1 1 4 68 0000000000
HLLDDLL OH~I O0 000 O0 0 13 1 1 4 68 0000000000
HLLS DLL OH~ O0 000 O0 0 13 1 1 4 68 0000000000
HRLDDLL OPIUM O0 000 O0 0 13 1 1 4 68 0000000000
HRLS DLL OPIUM O0 000 O0 0 13 1 1 4 68 0000000000
** DATA **
DEPT. 12783.000
HRLS.DLL 1.515
DEPT. 12536.834
HRLS.DLL 1.742
HLLD.DLL 1.738 HLLS.DLL 1.499 HRLD.DLL
HLLD.DLL 2.080 HLLS.DLL 1.735 HRLD.DLL
1. 726
2.079
** END OF DATA **
**** FILE TRAILER ****
FILE NACRE : EDIT .013
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E : EDIT .014
SERVICE : FLIC
VERSION . O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 14
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NUMBER: 2
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8~SEP-1997 1,.~6
PAGE:
42
DEPTH INCREMENT: O. 5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
PEX
LOG HEADER DATA
DATE LOGGED:
12268.0
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIM~E LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
STOP DEPTH
12094.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX DENS./NEUT.
GR GAMMA RAY
AMS AUX. MEAS. SONDE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
11 -AUG-97
8C0609
800 lO-AUG-97
30 11 -AUG-97
12750.0
12750.0
12268.0
12740.0
1800.0
TOOL NUMBER
HRDD
HGNS
AMS- A
6. 000
12265.0
12268.0
QUIKDRILN- KCL
8.90
49.0
8.5
214.0
O. 113 73.0
0.106 74.0
O. 324 74.0
THERMAL
SANDSTONE
2.65
0.1
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ZL~D
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~dD J~ND
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~D ,I, ND £~D~
0000000000 ~9 ~ ~ ~ ~ 0 O0 000 O0 ~D ,.Lt, ID D£dD
0000000000 89 ~ ~ ~ ~T 0 O0 000 O0 ~D ,LND DJ, ND
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 IdV £I~ HD~D
0000000000 89 ~ ~ r ~r 0 O0 000 O0 ~O~
0000000000 89 ~ ~ ~ Pr 0 O0 000 O0 ~ £I~N~H
0000000000 89 ~ ~ r ~r 0 O0 000 O0 ~q £I~ SNCJ£
0000000000 89 ~ ~ ~ ~[ 0 O0 000 O0 ~
(X'dH) WOOD I~tq~ dWVE ~qflNqOW SSV~D ~dI~ OO~ # N~CHO qI
SE~DONd Nd$!~I ~ZIS gWIIN gf41-lN ~Id Id-V Id-V Id~ IdV ~DIAH~S £INi] A~S ~qVN
~ NVHD - ~dI~L £~S ~
r 99 0
~ 99 9r
89 99 Sr
0 99 £~
89 Cr
6~ 99 rr
£d ~9 6
S'O 89 8
~9 ~
99 S
0 99 W
0 99 r
WII'-I~A ~GOD Nd~%~ ~WAJ~
~ ~HODH-H NOI£VDIdID~dS J. VArHOd V~VG ~
: WDVW
9n''r L66r-dHS-8
3~2U~D EuT2nd~oD ~s~rV J~J~qurnrumS
EUT2STq UOT2~TgT~A ~d~£ SI~
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 1,..6
PAGE:
NAFIE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NU~iB SAMP ELEM CODE (HEX)
NRAT CNT O0 000 O0 0 14 1 1 4 68 0000000000
NPHI CNT PU-S O0 000 O0 0 14 1 1 4 68 0000000000
TNPHCNT PU-S O0 000 O0 0 14 1 1 4 68 0000000000
** DATA **
DEPT. 12268.000 TENS.AIT 5644.000 HTEN. AIT 1576.017 MTEM.AIT
GRCH.AIT 43.219 CNTC.CNT 1738.497 CFTC. CNT 727.263 RCFT. CNT
RCNT. CNT 1741.149 CRAT. CNT 2.534 NRAT. CNT 2.697 NPHI.CNT
TNPH. CNT 27.196
DEPT. 12094.000 TENS.AIT 5572.000 HTEN. AIT 1505.985 MTE~.AIT
GRCH.AIT 97.253 CNTC. CNT 1368.779 CFTC. CNT 344.267 RCFT. CNT
RCNT. CNT 1339.968 CRAT. CNT 4.045 NRAT. CNT 3.786 NPHI.CNT
TNPH. CNT 52.231
204. 920
699. 888
26. 017
195.146
353.681
49.984
** END OF DATA **
**** FILE TRAILER ****
FILE NA~E : EDIT .014
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/09/ 8
ORIGIN : FLIC
TAPE NAME : 97367
CONTINUATION # : 1
PREVIOUS TAPE :
COf4F~2VT : B.P. EXPLORATION, W-O3A, PRUDHOE BAY, API #50-029-21953-01
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-SEP-1997 17:~o
PAGE:
45
**** REEL TRAILER ****
SERVICE NA~E : EDIT
DATE : 97/09/ 8
ORIGIN '. FLIC
REEL NAME : 97367
CONTINUATION # :
PREVIOUS REEL '.
CO~IENT : B.P. EXPLORATION, W-O3A, PRUDHOE BAY, API #50-029-21953-01