HomeMy WebLinkAbout205-030MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Friday, December 6, 2024
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Sully Sullivan
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
L-212
PRUDHOE BAY UN ORIN L-212
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 12/06/2024
L-212
50-029-23252-00-00
205-030-0
W
SPT
4300
2050300 1500
1512 1505 1508 1508
301 312 312 312
4YRTST P
Sully Sullivan
10/6/2024
tested to 2248 for 500 psi dp
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN ORIN L-212
Inspection Date:
Tubing
OA
Packer Depth
75 2248 2148 2133IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSTS241009095042
BBL Pumped:2.3 BBL Returned:2
Friday, December 6, 2024 Page 1 of 1
99
9 9
9
99
9
9
9
9
99
9
9
James B. Regg Digitally signed by James B. Regg
Date: 2024.12.06 10:58:07 -09'00'
Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 10/04/2024
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20241004
Well API #PTD #Log Date Log Company Log Type AOGCC
Eset#
BRU 214-13 50283201870000 222117 9/26/2024 AK E-LINE Perf
END 2-72 50029237810000 224016 8/26/2024 HALLIBURTON COILFLAG
END 2-72 50029237810000 224016 8/29/2024 HALLIBURTON COILFLAG
END 2-72 50029237810000 224016 8/29/2024 HALLIBURTON RBT
MPI 2-16 50029218850000 188134 9/9/2024 AK E-LINE Perf
MPI 2-16 50029218850000 188134 9/20/2024 AK E-LINE Perf
MPU B-16 50029213840000 185149 9/28/2024 READ CaliperSurvey
MPU B-24 50029226420000 196009 8/20/2024 HALLIBURTON PERF
MPU B-28 50029235660000 216027 9/28/2024 HALLIBURTON TUBINGCUT
MPU I-01 50029220650000 190090 8/17/2024 HALLIBURTON PERF
MPU R-103 50029237990000 224114 9/20/2024 AK E-LINE Hoist
MRU M-02 50733203890000 187061 9/23/2024 AK E-LINE Perf
PBU 02-21B 50029207810200 211033 9/30/2024 HALLIBURTON RBT
PBU L2-10 50029217460000 187085 8/23/2024 HALLIBURTON RBT
PBU L-212 50029232520000 205030 9/24/2024 HALLIBURTON IPROF
PBU L-254 50029237520000 223030 9/20/2024 HALLIBURTON IPROF
PBU P1-17 50029223580000 193051 9/7/2024 HALLIBURTON RBT
PBU S-09A 50029207710100 214097 8/21/2024 HALLIBURTON RBT
PBU Z-235 50029237600000 223055 9/19/2024 HALLIBURTON IPROF
Please include current contact information if different from above.
T39619
T39620
T39620
T39620
T39621
T39621
T39622
T39623
T39624
T39625
T39626
T39627
T39628
T39629
T39630
T39631
T39632
T39633
T39634
PBU L-212 50029232520000 205030 9/24/2024 HALLIBURTON IPROF
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.10.04 15:10:24 -08'00'
Nolan Vlahovich Hilcorp Alaska, LLC
Geo Tech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 06/02/2023
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20230416
Well API #PTD #Log Date Log Company Log Type AOGCC
Eset#
MPB-15 50029213740000 185121 5/16/2021 READ Caliper Survey
MPC-02 50029208660000 182194 4/26/2023 READ Caliper Survey
MPE-15 50029225280000 194153 4/17/2023 READ Caliper Survey
MPE-15 50029225280000 194153 4/21/2023 READ Caliper Survey
MPL-40 50029228550000 198010 4/18/2023 READ Caliper Survey
PBU D-03A 50029200570100 200134 5/28/2023 READ MRCBL
PBU L-212 50029232520000 205030 4/14/2023 READ Injection Profile
PBU S-210 50029236300000 219057 4/17/2023 READ Injection Profile
PBU V-212 50029232790000 205150 5/13/2023 READ Injection Profile
Please include current contact information if different from above.
T37721
T37722
T37723
T37723
T37724
T37725
T37726
T37727
T37728
PBU L-212 50029232520000 205030 4/14/2023 READ Injection Profile
Kayla Junke
Digitally signed by
Kayla Junke
Date: 2023.06.12
14:32:41 -08'00'
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU
2SHUDWLRQV
3HUIRUPHG
2SHUDWRU1DPH
$GGUHVV
:HOO&ODVV%HIRUH:RUN3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
/RJV/LVWORJVDQGVXEPLWHOHFWURQLFGDWDSHU$$&)LHOG3RROV
6XVS:HOO,QVS
,QVWDOO:KLSVWRFN
0RG$UWLILFLDO/LIW 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
&RLOHG7XELQJ2SV
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO 2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
3UHVHQW:HOO&RQGLWLRQ6XPPDU\
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWVUHTXLUHGSHU$$&
:HOO6WDWXVDIWHUZRUN
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH
2,/ *$6
:,1- :$* *,1-
:'63/
*6725 6XVSHQGHG 63/8*
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
3%8/
7XELQJ3DWFK
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH$QFKRUDJH$.
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
1RQH
1RQH
[ /
6WUXFWXUDO
%DNHU3UHPLHU3DFNHU1R6669,QVWDOOHG
6WDQ*ROLV
6U$UHD2SHUDWLRQV0DQDJHU
%URGLH:DJHV
'DYLG:DJHV#KLOFRUSFRP
358'+2(%$<6&+5$'(5%/8))2,/2ULRQ2LO3RRO
7RWDO'HSWK
(IIHFWLYH'HSWK
PHDVXUHG
WUXHYHUWLFDO
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
PHDVXUHG
PHDVXUHG
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
3OXJV
-XQN
3DFNHU
0HDVXUHGGHSWK
7UXH9HUWLFDOGHSWK
IHHW
IHHW
3HUIRUDWLRQGHSWK
7XELQJVL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
3DFNHUVDQG6669
W\SHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\
,QWHUYDOVWUHDWHGPHDVXUHG
7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDOSUHVVXUH
D5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD
2LO%EO *DV0FI :DWHU%EO &DVLQJ3UHVVXUH 7XELQJ3UHVVXUH
3ULRUWRZHOORSHUDWLRQ
6XEVHTXHQWWRRSHUDWLRQ
:HOO&ODVVDIWHUZRUN
([SORUDWRU\ 'HYHORSPHQW 6HUYLFH 6WUDWLJUDSKLF'DLO\5HSRUWRI:HOO2SHUDWLRQV
&RSLHVRI/RJVDQG6XUYH\V5XQ
(OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD
6XQGU\1XPEHURU1$LI&2([HPSW
$'/
1$
1$
E3RROVDFWLYHDIWHUZRUN2ULRQ
%DNHU3UHPLHU3DFNHU %DNHU3UHPLHU3DFNHU
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
5(32572)681'5<:(//23(5$7,216
6U3HW(QJ 6U3HW*HR
)RUP5HYLVHG6XEPLWLQ3')IRUPDWWRDRJFFSHUPLWWLQJ#DODVNDJRY
6U5HV(QJ
'XH:LWKLQGD\VRI2SHUDWLRQV
WKHEHVWRIP\NQRZOHGJ
*
1RYHPEHU
By Anne Prysunka at 10:40 am, Nov 14, 2022
RBDMS JSB 111622
DSR-11/14/22WCB 11-29-2024
$&7,9,7<'$7(6800$5<
7,2 /56XQLWDVVLVWVOLFNOLQH3(5)25$7,1*5RDGWRORFDWLRQ/RDG
'LHVHO58
:65&RQWLQXHGRQ
:(//6,21$55,9$/
SHUIRUDWLQJ
%586+(':)50
V ;1,33/(#
0'
6(7;6(/(&7,9(7(67722/,1;1,33/(#
0'
:65&217,18('21
:65&217,18(')520
SHUIRUDWLQJ
38//('5.:5)9)52067$#
0'
6(75.'*/9,167$
38//('5.:)59)52067$#
0'
6(75.'*/9,167$
$77(037('7238//7(67722/)520;1,33/(#
0'
38//('5.'*/9)5207232)7(67722/VW
6(75.'*/9,167#
0'
38//('7(67722/)520;1,33/(#
0'
38//('50;3521* %2'<)520;1,33/(#
0'
6(75('63,'(59$/9(6(556,1;1,33/(#
0'
'5,)7(':
['5,)772[;2#
0'
7LJKWVSRW#
VOP
:(///()76,21'(3$5785(3$'23127,),('2)67$786
'5,)7('72
6/0:
['800<:+,3672&.)25
68%6,'(1&(6859(,//$1&(
:65&RQWLQXHGIURP
3XPSHGEEOV'VOGRZQ7EJWRDVVLVW
VOLFNOLQHZLWK:)5FKDQJHRXW6((/2*)25'(7$,/6
7,2 7HPS :+3V8,&2Q3:,,$)/#VXUIDFH
:+3VDUH8,&FRPSOLDQW
69 &:966909 2,$2$ 27*
7,2 7(03
3XPSHGEEOV3XPSHGEEOVRI'\HG
ZDWHU)3VXUIDFHOLQHVDQG7UHH1RWLILHG3DG23RIZHOOVWDWXVXSRQGHSDUWXUH
69:9 &66909 2&9
V 27*):+3
V
7,2 7(03 +27)UHH]H3URWHFWDQGORDG7%*3XPSHG
EEOVGRZQ)/IRU)UHH]H3URWHFW3XPSHGEEOVRIDQGEEOV'6/
GRZQ7%*IRU)UHH]H3URWHFWDQG/RDG7DJVKXQJ3DG2SQRWLILHGRIZHOOVWDWXV
XSRQGHSDUWXUH):+3
V
:(//6,8321$55,9$/
ZDWHUIORRGUHJXODWRU
58+(66/,&./,1(81,7
&217:6521
&217:65)520
ZDWHUIORRGUHJXODWRU
6(73;3/8*,1;1,33/(#
0'
3(5)250('3$66,1*SVL35(6685(7(67
38//('5.'*/9$1'6(75.*877(':)5,167$#
0'
:(///()76,21'(3$785(
7,2 /5681,76FKPRR%*RQHWUHDWPHQW3XPSHGEEOV
0HWKDQROVSHDUIROORZHGE\EEOVRI6%*1RWLILHG'62RIVKXWGRZQWLPH
7XUQHGRYHUWR'62
):+3
'DLO\5HSRUWRI:HOO2SHUDWLRQV
3%8/
'DLO\5HSRUWRI:HOO2SHUDWLRQV
3%8/
:(//,1-(&7,1*21$55,9$/
3HUIRUDWLQJ
32//$5':($7+(5+2/''8(72+,*+:,1'6
-2%3267321(''8(72+,*+(535,25,7<-2%62163$'
:(//,1-(&7,1*21'(3$5785(127,),('3$'23(5$7252):(//
67$786
7,2 9DF$VVLVW6/3XPSHGEEOVWR)3)/3XPSHGEEOV
GHJUHHGVOGRZQ7%*IRU% )3XPSHGDQDGGLWLRQDOEEOV
'6/GRZQ
WEJ
MREFRQWLQXHGWR
:(//,1-(&7,1*21$55,9$/
SHUIRUDWLQJ
5$1[
3803%$,/(5723;3/8*$7
0'1RVROLGV
UHFRYHUHG
38//33521* 3;3/8*%2'<)520
6/0
0'
(48$/,=( 38//+(65('63,'(5VQ 56)520
6/0
0'
%586+ )/86++RW)520685)$&(72;2$7
0':%586+
*5,1*
6(750;%2'<,1;1,33/($7
6/0
0'
5$1&+(&.6(772;/2&.$7
0'7RROVKHDUHGLQGLFDWLQJJRRG
VHW
%586+ )/86+78%,1*7250;%2'<$7
0':%586+
*5,1*
6(7'800<50;3521*,150;%2'<$7
0'
-2%,1352*5(66&217,18('21:65
MREFRQWLQXHGIURP
$VVLVW6/ZLWK9DOYH&23XPSEEOV'6/GRZQ
7%*)LQDO7,2
&217)520:65
3HUIRUDWLQJ
38//5.$/:)5 6(75.'*/9$767
0'
'5,)772[;2$7
0':.%[
'800<3$7&+'5,)7
:(//6,21'(3$5785(127,),('3$'23(5$7252):(//67$786
:(//6+87,121$55,9$/
3(5)
0,58(/,1(
67$1'%<)25+,*+:,1'6
-2%&217,18(6212&7:65
-2%&217,18(6)5202&7:65
3(5)63$7&+
5,*83$1'373&(36,/2:36,+,*+
&255(/$7(723'6-(:(/5</2*-8/
3(5)25$7(63)3+$6(+6&0,//(1,80&+$5*(6
&&/76
&&/6723
6(7%$.(5.%3$7&+)520
72
(/(0(1772(/(0(17
2$/
0,','
5'02(/,1(
:(//6+87,121'(3$5785(
5($'<)256/,&./,1(
:(//6,21$55,9$/
0,586/,&./,1(
&217,18('21
3(5)25$7(
6(7%$.(5.%3$7&+)520
72
(/(0(1772(/(0(17
'DLO\5HSRUWRI:HOO2SHUDWLRQV
3%8/
:65&217,18(')520
5$1&(17$1'5672
6/081$%/(72/$7&+3521*
5$1
[67(0.-&(17$1'5672
6/081$%/(72
/$7&+3521*
5$1
[3803%$,/(572
6/0QRUHWXUQVPDUNVRQERWWRP
&283/(025(/$7&+$77(0376:28768&&(66PDUNVRQFRUHRISXOOLQJ
WRROLQGLFDWHYDOYHRQSURQJ
38//('5.'*/9)5207232)3521*
7$**('67#
0'YDOYHVWLOOLQSRFNHW
7$**('67#
0'RSHQSRFNHW
6(75.0$;)/2::)5,167#
0'
38//('5.'*/9)52067#
0'
6(75.0$;)/2::)5,167$#
0'
:65&217,18('21
7,2 /56$VVLVW6OLFNOLQH3(5)25$7,1*3XPSHGEEOVRI
KHDWHGGLHVHOLQWRWKH7%*
-REFRQWLQXHGWR
7,2 7HPS6,/56$VVLVW6/3(5)25$7,1*3XPSHGEEOV
'6/LQWR7%*WRDVVLVW6/6/LQFRQWURORIZHOOXSRQGHSDUWXUH):+3
V
:65&217,18(')520
38//(''800<50;3521*)52050;3/8*%2'<#
0'
6(70$;)/2::)550;3521*#
0'
:(//5(7851('72'62&203/(7(
-REFRQWLQXHGIURP
/56$VVLVW6OLFNOLQH3(5)25$7,1*
3XPSHGEEOVRIKHDWHGGLHVHOLQWR7%*6/LQFRQWURORIZHOOXSRQGHSDUWXUH
):+3
V
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU
2SHUDWLRQV
3HUIRUPHG
2SHUDWRU1DPH
$GGUHVV
:HOO&ODVV%HIRUH:RUN3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
/RJV/LVWORJVDQGVXEPLWHOHFWURQLFGDWDSHU$$&)LHOG3RROV
$EDQGRQ
6XVSHQG
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
5HHQWHU6XVS:HOO
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO 2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
3UHVHQW:HOO&RQGLWLRQ6XPPDU\
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWVUHTXLUHGSHU$$&
:HOO6WDWXVDIWHUZRUN
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH
2,/ *$6
:,1- :$* *,1-
:'63/
*6725 6XVSHQGHG 63/8*
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
3%8/
&KDQJHG:HOO6WDWXV
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH$QFKRUDJH$.
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
1RQH
1RQH
[ /
6WUXFWXUDO
%DNHU3UHPLHU3DFNHU
6WDQ*ROLV
6U$UHD2SHUDWLRQV0DQDJHU
%URGLH:DJHV
'DYLG:DJHV#KLOFRUSFRP
358'+2(%$<6&+5$'(5%/8))2,/2ULRQ2LO3RRO
7RWDO'HSWK
(IIHFWLYH'HSWK
PHDVXUHG
WUXHYHUWLFDO
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
PHDVXUHG
PHDVXUHG
IHHW
IHHW
IHHW
IHHW
PHDVXUHG
WUXHYHUWLFDO
3OXJV
-XQN
3DFNHU
0HDVXUHGGHSWK
7UXH9HUWLFDOGHSWK
IHHW
IHHW
3HUIRUDWLRQGHSWK
7XELQJVL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
3DFNHUVDQG6669W\SHPHDVXUHGDQGWUXHYHUWLFDOGHSWK
6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\
,QWHUYDOVWUHDWHGPHDVXUHG
7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDO
5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD
2LO%EO *DV0FI :DWHU%EO &DVLQJ3UHVVXUH 7XELQJ3UHVVXUH
3ULRUWRZHOORSHUDWLRQ
6XEVHTXHQWWRRSHUDWLRQ
:HOO&ODVVDIWHUZRUN
([SORUDWRU\ 'HYHORSPHQW 6HUYLFH 6WUDWLJUDSKLF'DLO\5HSRUWRI:HOO2SHUDWLRQV
&RSLHVRI/RJVDQG6XUYH\V5XQ
(OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD
6XQGU\1XPEHURU1$LI&2([HPSW
$'/
1$
11$
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
5(32572)681'5<:(//23(5$7,216
6U3HW(QJ 6U3HW*HR
)RUP5HYLVHG6XEPLW:LWKLQGD\VRU2SHUDWLRQV
6U5HV(QJ
%DNHU3UHPLHU3DFNHUV
1R6669,QVWDOOHG
By Samantha Carlisle at 3:49 pm, Jan 18, 2022
'LJLWDOO\VLJQHGE\6WDQ*ROLV
'1FQ 6WDQ*ROLV
RX 8VHUV
'DWH
6WDQ*ROLV
,ISHUIRUDWLQJ
7\SHRI5HTXHVW
2SHUDWRU1DPH
$GGUHVV
&XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
$EDQGRQ
6XVSHQG
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
5HHQWHU6XVS:HOO
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO
2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKHVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL3OXJV0'-XQN0'
35(6(17:(//&21',7,216800$5<
3HUIRUDWLRQ'HSWK0'IW 3HUIRUDWLRQ'HSWK79'IW7XELQJ6L]H 7XELQJ*UDGH 7XELQJ0'IW
3DFNHUVDQG66697\SH3DFNHUVDQG66690'IWDQG79'IW
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWV
(VWLPDWHG'DWHIRU
&RPPHQFLQJ2SHUDWLRQV
:HOO&ODVVDIWHUSURSRVHGZRUN
:HOO6WDWXVDIWHUSURSRVHGZRUN
9HUEDO$SSURYDO
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURFDO
3URSRVDO6XPPDU\:HOOERUHVFKHPDWLF
%236NHWFK'HWDLOHG2SHUDWLRQV3URJUDP
2,/
*$6
:,1-
:$*
*,1-
:'63/
*6725
2S6KXWGRZQ
6XVSHQGHG
63/8*
$EDQGRQHG
6HUYLFH'HYHORSPHQW6WUDVWLJUDSKLF([SORUDWRU\
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
$2*&&86(21/<
&RPPLVVLRQ5HSUHVHQWDWLYH
&RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
/RFDWLRQ&OHDUDQFH0HFKDQLFDO,QWHJULW\7HVW%237HVW3OXJ,QWHJULW\
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV
<HV 1R
1R 6XEVHTXHQW)RUP5HTXLUHG
$SSURYHG%\'DWH
$33529('%<
7+($2*&&&200,66,21(5
3%8/
&KDQJH:HOO6WDWXV
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH
$QFKRUDJH$.
%
$'/
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
1RQH
1RQH
[/
6WUXFWXUDO
%DNHU3UHPLHU3DFNHU
%DNHU3UHPLHU3DFNHUV
'DWH
6WDQ*ROLV
6U$UHD2SHUDWLRQV0DQDJHU
%URGLH:DJHV
'DYLG:DJHV#KLOFRUSFRP
358'+2(%$<6&+5$'(5%/8))2,/2ULRQ2LO3RRO
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
&RPP&RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Samantha Carlisle at 7:49 am, Dec 27, 2021
'LJLWDOO\VLJQHGE\6WDQ*ROLV
'1FQ 6WDQ*ROLV
RX 8VHUV
'DWH
6WDQ*ROLV
0*5-$1'65
'/%
;
dts 1/14/2022 JLC 1/14/2022
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.01.14
11:45:10 -09'00'
RBDMS HEW 1/14/2022
t' ŽŶǀĞƌƐŝŽŶ
tĞůů͗ >ͲϮϭϮ
Wd͗ϮϬϱͲϬϯϬ
tĞůůEĂŵĞ͗>ͲϮϭϮ W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϯϮϱϮͲϬϬ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗KŶůŝŶĞWt/ŶũĞĐƚŽƌ ZŝŐ͗EŽŶĞ
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗:ĂŶ ϱ͕ϮϬϮϭ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϭĚĂLJ
ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ ĂƚĞZĞŐ͘ƉƉƌŽǀĂůZĞĐ͛ǀĚ͗
ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞ ĂƌŬĞƌ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϬϱͲϬϯϬ
&ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ĂǀŝĚtĂŐĞƐ ϵϬϳ͘ϱϲϰ͘ϱϬϬϲ;KͿ ϳϭϯ͘ϯϴϬ͘ϵϴϯϲ;DͿ
>ĂƚĞƐƚ^/dƵďŝŶŐWƌĞƐƐƵƌĞ͗ ϰϬϬƉƐŝ
ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϮϯϭϮ ƉƐŝΛ ϰϯϰϲ͛ds Ϭ͘ϰϰƉƉƐŝͬĨƚĨůƵŝĚĐŽůƵŵŶǁͬϰϬϬƉƐŝ^/dW
DĂdžŝŵƵŵ džƉĞĐƚĞĚ,W͗ϮϱϬϬƉƐŝΛ ϰϯϰϲ͛ds
DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϬϲϱ ƉƐŝ 'ĂƐŽůƵŵŶ'ƌĂĚŝĞŶƚ;Ϭ͘ϭƉƐŝͬĨƚͿ
ƌŝĞĨtĞůů^ƵŵŵĂƌLJ
>ͲϮϭϮǁĂƐƐƉƵĚĚĞĚŽŶDĂƌĐŚϮϰ͕ϮϬϬϱ͘^ƵƌĨĂĐĞĐĂƐŝŶŐǁĂƐƐĞƚĂŶĚĐĞŵĞŶƚĞĚŽŶDĂƌĐŚϮϴƚŚ ǁŝƚŚĂďŽƵƚϭϬϬ
ďďůƐ ŽĨ͞ŐŽŽĚĐůĞĂŶĐĞŵĞŶƚƌĞƚƵƌŶĞĚƚŽƐƵƌĨĂĐĞ͘͟ ůĂƌŐĞĂŵŽƵŶƚŽĨĞdžĐĞƐƐĐĞŵĞŶƚǁĂƐƉƵŵƉĞĚďĞĐĂƵƐĞĂŶ
ŽƉĞŶŚŽůĚƐŝĚĞƚƌĂĐŬŚĂĚƚŽďĞƉĞƌĨŽƌŵĞĚĂƚϲϳϴ͛ĚƵĞƚŽĂŶŽƉĞŶŚŽůĞŽďƐƚƌƵĐƚŝŽŶĞŶĐŽƵŶƚĞƌĞĚĂƚƚŚĂƚĚĞƉƚŚ͘
WϭdŝƐϴϮϰ͛D͘ WƌŝŽƌƚŽŵŝůůŝŶŐŽƵƚƚŚĞƐƵƌĨĂĐĞ ĐĂƐŝŶŐƐŚŽĞ͕ĂϯϱϬϬƉƐŝƉƌĞƐƐƵƌĞƚĞƐƚŽĨƚŚĞĐĂƐŝŶŐǁĂƐ
ŽďƚĂŝŶĞĚ͘&ŽƌŵĂƐĞƚƉůƵŐǁĂƐƐĞƚŶĞĂƌďŽƚƚŽŵ͕ŝƐŽůĂƚŝŶŐƚŚĞ<ƵƉĂƌƵŬ͕ǁŝƚŚƚǁŽŽƚŚĞƌĐĞŵĞŶƚƉůƵŐƐ;ŝƐŽůĂƚŝŶŐ
ƚŚĞ^ĐŚƌĂĚĞƌůƵĨĨĂŶĚhŐŶƵDͿƐĞƚƵƉƚŚĞŚŽůĞ͘
ĨƚĞƌĐĞŵĞŶƚŝŶŐŽƉĞƌĂƚŝŽŶƐǁĞƌĞĐŽŵƉůĞƚĞ͕ ƚŚĞŝŶũĞĐƚŝŽŶŚŽůĞǁĂƐŬŝĐŬĞĚŽƵƚĂƚϰϭϴϬ͛DĂŶĚ>ͲϮϭϮŝǁĂƐ
ĚƌŝůůĞĚƚŽdŽĨϴϴϰϱ͛D͘dŚĞϳ͟ƉƌŽĚƵĐƚŝŽŶĐĂƐŝŶŐǁĂƐƐĞƚĂŶĚĐĞŵĞŶƚĞĚĂƚϴϴϯϮ͛ǁŝƚŚϵϬďďůƐŽĨϭϱ͘ϴƉƉŐ
ůĂƐƐ'ĐĞŵĞŶƚ͘ĨƚĞƌƚŚĞĐĞŵĞŶƚũŽď͕ƚŚĞĐĂƐŝŶŐǁĂƐƉƌĞƐƐƵƌĞƚĞƐƚĞĚƚŽϰϬϬϬƉƐŝĨŽƌĂ ĐŚĂƌƚĞĚƚĞƐƚ͘
^ĐŽƉĞŽĨtŽƌŬ
ŽŶǀĞƌƚ>ͲϮϭϮĨƌŽŵĂWt/ŽŶůLJŝŶũĞĐƚŽƌƚŽĂt'ŝŶũĞĐƚŽƌ͘^ƵƌĨĂĐĞD/ůŝŶĞƐĂůƌĞĂĚLJĞdžŝƐƚ͕ǁĞŽŶůLJŶĞĞĚƚŽƌĞͲ
ĐůĂƐƐŝĨLJƚŚĞǁĞůůĂƐt'ŝŶũĞĐƚŽƌ
EŽƚĞƐZĞŐĂƌĚŝŶŐtĞůůďŽƌĞŽŶĚŝƚŝŽŶ͗
Ͳ ϭϬͬϭϵͬϮϬϮϬD/dͲ/ƚŽϭϴϳϯƉƐŝ
Ͳ ϰͬϴͬϮϬϭϵD/dͲ/ƚŽϯϯϰϯƉƐŝ
Ͳ ϮͬϮϭͬϮϬϭϵĐĂůŝƉĞƌƐĂǁŶŽƐŝŐŶŝĨŝĐĂŶƚǁĂůůůŽƐƐŽƌƉŝƚƚŝŶŐ
Ͳ dŚĞƌĞŝƐƉĞŶĚŝŶŐǁĞůůǁŽƌŬƚŽƉĞƌĨŽƌĂƚĞƚŚĞKƐĂŶĚƐŝŶ>ͲϮϭϮƚŚƌŽƵŐŚƚƵďŝŶŐƚŚĞŶƉĂƚĐŚŽǀĞƌƚŚĞ
ƚƵďŝŶŐŚŽůĞƐ;ůĞĂǀŝŶŐƚŚĞĐĂƐŝŶŐŚŽůĞƐͿ͘dŚŝƐǁŽƌŬǁŝůůŶŽƚĐŚĂŶŐĞƚŚŝƐKZ͘
ƌĞĂŽĨZĞǀŝĞǁ ʹ WhsͲϭϯϳ ;WdηϮϭϳϭϯϰͿ
WƌŝŽƌƚŽƚŚĞĐŽŶǀĞƌƐŝŽŶŽĨǁĞůů >ͲϮϭϮ ĨƌŽŵ Wt/ŽŶůLJŝŶũĞĐƚŽƌ ƚŽ t' ŝŶũĞĐƚŽƌ͕ĂŶƌĞĂŽĨZĞǀŝĞǁ;KZͿ
ŚĂƐ ďĞĞŶ ĐŽŶĚƵĐƚĞĚ͘dŚŝƐKZĨŽƵŶĚ ϰ ŽƚŚĞƌǁĞůůƐ;ƚǁŽůĂƚĞƌĂůƐŽĨ>ͲϮϱϬ͕ƚŚƌĞĞůĂƚĞƌĂůƐŽĨ>ͲϮϬϬĂŶĚ >Ͳ
ϮϬϳĂŶĚ>ͲϮϬϲͿ ǁŝƚŚŝŶЬŵŝůĞŽĨ >ͲϮϭϮ͛Ɛ ĞŶƚƌLJƉŽŝŶƚŝŶƚŽƚŚĞ ^ŚƌĂĚĞ ƌ &ŽƌŵĂƚŝŽŶ͘ ^ĞĞĂƚƚĂĐŚĞĚ ƚĂďůĞ
ƌĞĂŽĨZĞǀŝĞǁ >ͲϮϭϮ ĨŽƌĂŶŶƵůƵƐŝŶƚĞŐƌŝƚLJĂŶĚnjŽŶĂůŝƐŽůĂƚŝŽŶŽĨĂůůǁĞůůƐǁŝƚŚŝŶƚŚĞKZ͘
tĞůů ŝƐƚƚŽ>ͲϮϭϮ;ΛKͿ KƐĂŶĚƚŽƉ;DͬdsͿ
>ͲϮϱϬ ϵϲϱ͛ ϳϭϭϬ͛Dͬϰϯϵϴ͛ds ;KƐĂŶĚůĂƚĞƌĂůͿ
>ͲϮϱϬ>ϭ ϴϳϱ͛ Eͬ;EƐĂŶĚůĂƚĞƌĂůͿ
>ͲϮϬϬ ϭϬϮϬ͛ ϳϭϴϴ͛DͬϰϮϳϴ͛ds;KĚƐĂŶĚůĂƚĞƌĂůͿ
>ͲϮϬϬ>ϭ ϵϳϱ͛ Eͬ;KďƐĂŶĚůĂƚĞƌĂůͿ
>ͲϮϬϬ>Ϯ ϭϬϬϱ͛ Eͬ;KĂƐĂŶĚůĂƚĞƌĂůͿ
>ͲϮϬϲ ϴϰϱ͛ ϲϳϭϮ͛DͬϰϮϲϵ͛ds
>ͲϮϬϳ ϭϭϴϱ͛ ϲϳϲϳ͛DͬϰϮϲϴ͛ds
'/%
t' ŽŶǀĞƌƐŝŽŶtĞůů͗ >ͲϮϭϮWd͗ϮϬϱͲϬϯϬKZdĂďůĞ
t' ŽŶǀĞƌƐŝŽŶ
tĞůů͗ >ͲϮϭϮ
Wd͗ϮϬϱͲϬϯϬ
KZDĂƉ
t' ŽŶǀĞƌƐŝŽŶtĞůů͗ >ͲϮϭϮWd͗ϮϬϱͲϬϯϬyͲ^ĞĐƚŝŽŶ͗³&VJµ0''HJ*DV +\GUDWHVµ a¶ 0'.23 µ 0''HJ)DXOW µ 0'+HDY\ 2LOµ¶ 0'3RVV +HDY\ 2LOµ¶ 0'6WDUW 'URS µ 0'7'µ 0'69696969698*$8*8*0 6DQGV16DQGV26DQGV7.83/3% DQG /L/L/3%'HJ
t' ŽŶǀĞƌƐŝŽŶ
tĞůů͗ >ͲϮϭϮ
Wd͗ϮϬϱͲϬϯϬ
t
'/%
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field/Pool(s):
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in thes pool?
Will planned perforations require a spacing exception?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStrastigraphicExploratory
Authorized
Name:
Authorized Title:
Authorized Signature: Date:
Contact Name:
Contact Email:
Contact Phone:
COMMISSION USE ONLY
Commission Representative:
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other:
Post Initial Injection MIT Req'd?
Spacing Exception Required?Yes
Yes No
No Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE COMMISSIONCOMMISSIONER
PBU L-212
Tubing Patch
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
205-030
50-029-23252-00-00
505B
ADL 0028239
8845
Conductor
Surface
Intermediate
Production
Liner
4758
77
4025
8806
8748
20"
9-5/8"
7"
4708
31 - 108
30 - 4055
26 - 8832
1853
31 - 108
30 - 2636
26 - 4751
None
3090
7020
None
5750
8160
8054 - 8520 4-1/2" 12.6# x 3-1/2" 9.3#L80 24 - 84484376 - 4594
Structural
4-1/2" Baker Premier Packer
3-1/2" Baker Premier Packer
7885, 4300
8143, 4415 / 8350, 4512
Date:
Stan Golis
Sr. Area Operations Manager
Brian Glasheen
Brian.Glasheen@hilcorp.com
907.564.5277
PRUDHOE BAY, SCHRADER BLUFF OIL, ORION
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval.
10/15/21
By Samantha Carlisle at 9:30 am, Oct 04, 2021
321-525
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.10.03 10:51:50 -08'00'
Stan Golis
(880)
SFD 10/4/2021 DSR-10/5/21
10-404
MGR11OCT2021
dts 10/11/2021
JLC 10/11/2021
Jeremy Price Digitally signed by Jeremy Price
Date: 2021.10.11 13:48:04 -08'00'
RBDMS HEW 10/12/2021
Well: L-212
PTD:205-030
Well Name:L-212 API Number:50-029-23252-00
Current Status:SI AFE 212-00995
Estimated Start Date:10/05/2021 Estimated Duration:5
Reg.Approval Req’std?Date Reg. Approval Rec’vd:
Regulatory Contact:Abbie Barker 564-4915
First Call Engineer:Brian Glasheen (907) 564-5277 (O)(907) 545-1144 (M)
Second Call Engineer:Brodie Wages (907) 564-5006 (O)(713) 380-9836 (M)
Current Bottom Hole Pressure:2293 psi @ 4400’ TVD(SBHP 10/2008)
MPSP:1853 psi (Assuming all gas)
Min ID:2.813 at 8123’ MD
Tie In Log:Attached
Brief Well Summary:
Hilcorp recommends to perforate the Oa in L-212i to support L-200A. L-212 currently is perforated in the Oba,
Obb, and Obd sands in Orion polygon 1. Hilcorp plans to drill L-200A to produce the Oa from Orion Polygon 1 in
2021. The L-212i – L-200A Oa waterflood pattern contains 1.6 MMBO OOIP and should produce up to 400
MBO.
Notes Regarding Wellbore Condition:
10/19/2020 AOGCC MIT-IA Passed to 1873 psi
4/8/2019 MIT-IA Passed to 3343 psi
2/21/2019 Caliper from 8,405' to Surface: Moderate buckling found from 320-800' md, No significant wall
loss
10/18/2016 AOGCC MIT-IA passed to 2000 psi
6/11/2012 AOGCC MIT-IA to 2007 psi - Passed
5/31/2012 MIT-IA Passed to 4000 psi
6/26/2009 Treated conductor w/ 17 gals of RG-2401
10/4/2005 AOGCC MITIA Passed to 1600 psi
8/13/2005 CT pulled PX plug from 8426'
Objective:
Change out WFRV and add perfs to the OA and patch it with a 4.5’’ big bore patch to allow WFRV work below
patch.
Procedure:
SL
1. Drift for 4.5’’ BIG BORE NS patch to XO 7945’ MD
2. RIH pull RMX and change out with 3.5’’ Red Spyder valve
3. RIH and pull ST 1 and replace with DMY to dummy off OBb zone.
4. RIH pull ST 3 and replace with P-15 Stiff spring 22 size orifice sized for 1340 bwpd.
o perforate the Oa
Well: L-212
PTD:205-030
EL
1. RIH with 3.125” Millennium 6 shot 60-degree phasing and shoot perf interval annotated on tie in log
below. Contact OE and GEO for tie in approval
2. Set 30’ 4.5” NS BIG BORE patch over perfs shot above. Review tie in log attached for patch depths and
contact OE and GEO for tie in approval. Carl Diller will provide patch schematic. We may choose to tag
XO and set patch right on top of XO at 7945’md with proper space out.
OPS
POI with target rates updated in SCADA
Well: L-212
PTD:205-030
WBS
Well: L-212
PTD:205-030
Proposed WBS
Well: L-212
PTD:205-030
TIE IN LOG
Well: L-212
PTD:205-030
Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Workover Sundry ProcedureDate: October 1, 2021Subject: Changes to Approved Sundry Procedure for Well L-212Sundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date
MEMORANDUM
TO: Jim Regg --,? 10(Z- 2"zo
P.I. Supervisor `\
FROM: Bob Noble
Petroleum Inspector
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, October 26, 2020
SUBJECT: Mechanical Integrity Tests
Hilcop North Slope, LLC
L-212
PRUDHOE BAY UN ORIN L-212
Sre: Inspector
Reviewed By:
P.I. Suprv-J
Comm
Well Name PRUDHOE BAY UN ORIN L-212 API Well Number 50-029-23252-00-00 Inspector Name: Bob Noble
Insp Num: mi[RCN2010I9163123 Permit Number: 205-030-0 Inspection Date: 10/192020
Rel Insp Num:
Packer
L-212 Type Inj w TVD
2050300 Type Test "sPT"Test psi
Pumped: 0,6 BBL Returned:
Val 4YRTST.- .PAF
Notes:
Depth
Pretest
Initial
15 Min
30 Min 45 Min 60 Min
4300
Tubing
1123
1123.
1120
1119 .
1500
IA
1151
1911 -
1876
1873 -
06
OA —
212 -
298
290 -
289
Monday, October 26, 2020 Page I of I
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg I DATE: Friday,November 04,2016
P.I.Supervisor Kee�1 it lo(I10 SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC.
L-212
FROM: Johnnie Hill PRUDHOE BAY UN ORIN L-212
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Suprvs3 —
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UN ORIN L-212 API Well Number 50-029-23252-00-00 Inspector Name: Johnnie Hill
Permit Number: 205-030-0 Inspection Date: 10/18/2016
Insp Num: mitJWH161018160801
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well L-212 . Type Inj W TVD 4300 - Tubing 1168 1175 . 7 1164 . 1173 PTD 2050300 2050300 - Type Test SPT Test psi' 1500 - IA 714 ! 1999 1963 - 1958 ,
Interval 14YRTST • jP/F P ✓ OA 184 294 - 282 275
Notes:
t 217
SCMit�� Me }4 4 $
Friday,November 04,2016 Page 1 of 1
• •
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com>
Sent: Saturday, June 11, 2016 6:44 PM
To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS
Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations
Superintendent;AK, D&C Well Services Operations Superintendent; AK, RES GPB West
Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC Ops Lead; AK, OPS WELL
PAD W; Zoesch, Eric;Wallace, Chris D (DOA)
Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; AK,
OPS FF Well Ops Comp Rep; McVey, Adrienne; Regg,James B (DOA); Hibbert, Michael;
Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus,
Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J
Subject: NOT OPERABLE:Injector L-212 (PTD #2050300) Will Remain Shut In Past AOGCC MIT
Test Date
All,
Injector L-212 (PTD#2050300) is due for an AOGCC-witnessed test by the end of June 2016.There are no plans to bring
the well online until 2017.The well is reclassified as Not Operable, and should remain shut in.
Thanks,
Adrienne McVey
Well Integrity Superintendent—GWO Alaska
(Alternate:Jack Lau)
0:(907)659-5102
C: (907)943-0296 SCANNED JUN 1 7 2016
H:2376 W��
Email: AKDCWellIntegrityCoordinatorPBP.com
From: AK, D&C Well Integrity Coordinator
Sent: Saturday, June 11, 2016 6:38 PM
To: AK, OPS G2OSM; AK, OPS GC2 Field O&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski,
Doug A; Daniel, Ryai1 Ai , D&C Wireline Operations Superintendent; AK, D&C Well Services Operations Superintendent;
AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC Ops Lead; AK, OPS WELL PAD W;
Zoesch, Eric; 'chris.wallace@alaska.gov' (chris.wallace@alaska.gov)
Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep;
AK, D&C Well Integrity Coordinator; McVey, Adrienne; 'Regg, James B (DOA) (jim.re•g@alaska.gov)'
(jim.regg@alaska.gov); Hibbert, Michael; Janowski,Cajzie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau;
Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J
Subject: NOT OPERABLE: Injector L-211 (PTD #2040290) Will R ain Shut In Past AOGCC MIT Test Date
All,
Injector L-211 (PTD#2040290) is due for an AOGCC-witnessed test by the end of June 201There are no plans to bring
the well online until 2017.The well is reclassified as Not Operable, and should remain shut in.
Thanks,
1
/ z05 0300
Regg, James B (DOA)
From: King, Whitney [Whitney.King1 @bp.com] g. �j7irz--
Sent: Wednesday, June 06, 2012 9:35 PM 7
To: AK, D &C Well Integrity Coordinator; Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS
GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad
LV; AK, OPS Prod Controllers; Cismoski, Doug A; AK, D &C Wireline Operations Team Lead;
AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; Daniel,
Ryan; Derrick, Mackie
Cc: Arend, Jon (NORTHERN SOLUTIONS LLC); Wills, Shane M; LeBaron, Michael J; King,
Whitney; Yeager, Kevin E
Subject: UNDER EVALUATION: L -211 (PTD #2040290) , L -212 (PTD# 2050300), L -218 (PTD #
2051190) Wells Due for MITIA Compliance Testing
All,
Injectors L -211 (PTD #2040290) , L -212 (PTD # 2050300), L -218 (PTD #2051190) exceeded their 4 year MIT -IA
requirement due to being shut in for reservoir management. Injector L -211 (PTD # 2040290) passed an MIT -IA
to 4000 psi on 05/31/12. Injector L -212 (PTD # 2050300) passed an MIT -IA to 4000 psi on 05/31/12. Injector
L -218 (PTD # 2051190) passed an MIT -IA to 4000 psi on 06/02/12. These wells are ready to be put back on
injection and are being reclassified as Under Evaluation so that an AOGCC MIT -IA can be obtained once the
wells are thermally stable.
Please be aware of the potential for annular fluid expansion when putting these wells on injection.
Please call if there are any questions. Thank you,
Whitney King filling in for
Gerald Murphy (alt. Mehreen Vazir)
Well Integrity Coordinator
Office (907) 659 -5102
Cell (907) 752 -0755 JUL 1 3 201.4
Pager (907) 659 -5100 Ext. 1154
1
L-212 (PTD#2050300) and L-2~PTD#2040650) Request for 4-Year r~atory testing ... Page 1 of 2
Maunder, Thomas E (DOA)
From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com]
Sent: Saturday, October 10, 2009 8:56 AM
To: Maunder, Thomas E (DOA)
Subject: RE: L-212 (PTD#2050300) and L-216 (PTD#2040650) Request for 4-Year regulatory testing
extension
~~~~~~
Thank you Mr. Maunder. ~r~~~~~ ~~ 1r ~~t, 2~Q~
Torin
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Saturday, October 10, 2009 6:42 AM
To: NSU, ADW Well Integrity Engineer
Cc: Regg, James B(DOA); Schwartz, Guy L(DOA)
Subject: RE: L-212 (PTD#2050300) and L-216 (PTD#2040650) Request for 4-Year regulatory testing e~ension
Torin,
I agree that better scheduling would be preferred. Since there is nof indication of integrity loss, it is acceptable to
delay until the rig moves. Keep us informed as to the timing. I am not totally familiar with the upcoming schedule
on other pads, but it would seem appropriate to look forward and determine if there could be some conflicts out
there.
Tom Maunder, PE
AOGCC
From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEngineer@BP.com]
Sent: Fri 10/9/2009 3:11 PM
To: Maunder, Thomas E(DOA); NSU, ADW Well Integrity Engineer
Cc: Regg, James B(DOA); Schwartz, Guy L(DOA)
Subject: RE: L-212 (PTD#2050300) and L-216 (PTD#2040650) Request for 4-Year regulatory testing extension
Tom,
The plan was to wait until two or three days before the L-212 and L-216 witnessed MITIAs were do to group them
with the MITIAs for L-115, L-215, and V-104 (due 11/28/09) to save a trip for the AOGCC field inspector. In the
past, the inspector had made the trip all the way out to L or V-Pad for one well inspection and we are trying to do
a better job at scheduling these to respect their time. Unfortunately, the rig trucks began staging equipment and
the activity on the pad became to congested to perform the work.
The reason for not performing the MITIAs until the rig moves is because the area is extremely congested with the
rig, rig camps, trucks, pipe racks, etc. The team is not comfortable conducting this work with the current activity
on the pad and most of the current obstacles can be eliminated after the rig moves.
There is rig equipment directly in front of wellhouses L-212 and L-216. Close proximity to Rig N-7ES is 45-90 feet
in this case.
I too would much rather have had these tested prior to the rigs arrival and I am embarrassed these have not been
completed.
Thank you,
10/12/2009
L-212 (PTD#2050300) and L-2~TD#2040650) Request for 4-Year r~atory testing ... Page 2 of 2
Torin
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Friday, October 09, 2009 1:45 PM
To: NSU, ADW Well Integrity Engineer
Cc: Regg, James B(DOA); Schwartz, Guy L(DOA)
Subject: RE: L-212 (PTD#2050300) and L-216 (PTD#2040650) Request for 4-Year regulatory testing extension
Torin,
Some questions ...
Why were these injectors not tested in advance of moving N7ES to L-223? Were there some extenuating
circumstances that prevented the wells from testing earlier than the 4 yr anniversary date? Testing earlier is
something that we clearly would not refuse.
- What is it about performing the MIT that prevents you from testing with the rig in "close proximity"?
- What is close proximity?
Thanks in advance. I look forward to your reply.
Tom Maunder, PE
AOGCC
From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEngineer@BP.com]
Sent: Friday, October 09, 2009 11:40 AM
To: Regg, James B(DOA); Maunder, Thomas E(DOA); Schwartz, Guy L(DOA)
Subject: L-212 (PTD#2050300) and L-216 (PTD#2040650) Request for 4-Year regulatory testing extension
Jim/Tom/Guy,
Injectors L-212 (PTD#2050300) and L-216 (PTD#2040650) were due for their 4-year regulatory MITIA's on
10/04/09. Currently, Rig N-7ES is drilling L-223 and will follow by drilling L-222. These two injectors are in close
proximity to the rig and do not allow enough space to safely perform AOGCC MITIA's at this time. I would like to
ask permission to inject in both L-212 and L-216 until the rig has moved off L-Pad toward the end of October at
which time the MITIA's will be immediately conducted. I have attached the Tl0 plot and wellbore schematic for
each injector.
«L-212.pdf» «L-212 TIO Plot.doc»
«L-216.pdf» «L-216 TIO Plot.doc»
Please let me know if you require anything else.
Thank you,
Torin Roschinger (alt. Anna Dube)
Well Integrity Coordinator
Office (907) 659-5102
Cell (406) 570-9630
Pager (907) 659-5100 Ext. 1154
10/12/2009
L-212 (PTD# 2050300) TIO Plot
~
a~
~
~
~
n~
a
I
~ I
~
a
~
~
»
' IA MOASP
ti
' OA MO
r
7
7C31 C2009 8M Sf2009 8f31 C2009 9M Sf2009 9f30f20~9
+Tubing Pressure (psi)
f IA Pressure (psi)
tOR Pressure (psi)
<> OOA Pressure (psi)
-f OOOA Pressure (psi)
u
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
August 14, 2009 s~~.~~'~~~`~~-=~r ~~"~~';' -`~ `' ~~~~'
1._J
bp
~~~~~~~~
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion inhibitor Treatments of GPB L-Pad
Dear Mr. Maunder,
OCT 0 5 2009
~las~C~ ~il ~c Gas Cons. Commi~~ion
Anchoraga
~,~" ~`~ d
~'~ l~
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB L-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
~
BP Exploration (Alaska ) Inc.
i
Surtace Casing by Conductor Mnulus Cement, Corcosion inhibitor, Sealant Top-off
Report of Sundry Operations (10~04)
narP
L pad
B/t 3/2009
Well Name
PTD #
API #
Inidal to of cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitod sealant
date
ft bbls ft na al
L-01 2010720 50029230110000 NA 6 NA 61.2 6/25/2009
L-02A 2041490 50029230480100 NA 1.4 NA 14.5 6/27/2009
L-03 2051030 50029232690000 NA 2.8 NA 24.7 6/25/2009
L-04 2061200 50029233190000 NA 1.7 NA 15.3 6/25/20~9
1.-100 1980550 50029228580100 NA 62 NA 57.8 6/29/2009
L-101 1980320 50029228650000 NA 3.3 NA 30.6 6/29/2009
L-102 2020360 50029230710000 37' NA Need To Job? NA
L-103 2021390 50029231010000 NA 1.6 NA 10.2 6/26/2009
L-104 2012380 50029230600000 NA 3.5 NA 47.6 5/6/2009
L-105 2020580 50029230750000 NA 1.75 NA 24.65 5/6/2009
L-106 2012230 50029230550000 NA 2.75 NA 28.05 5/6/2009
L-107 2011510 50029230360000 NA 4.8 NA 57.8 5/6/2009
L-108 2021090 50029230900000 NA 1.2 NA 13.8 6/25/2009
L-109 2012010 50029230460000 NA 2.9 NA 32.3 6/27/2009
L-110 2011230 50029230280000 NA 27 NA 316.2 6/29/2009
L-111 2020300 50029230690000 NA 4.7 NA 54.4 6/29/2009
L-112 2022290 50029231290000 NA 5.5 NA 51 6/27/2009
L-114A 2051120 50029230320100 NA 2.5 NA 25.5 6/29/2009
L-115 2011400 50029230350000 NA 0.5 NA 3.4 6/27/2009
L-116 2011160 50029230250000 NA 5 NA 54.4 6/28/2009
L-117 2011670 50029230390100 NA 2.9 NA 28.9 6/27/2009
L-118 2011870 50029230430000 NA 1.4 NA 15.3 6/27/2009
L-119 2020640 50029230770000 NA 2.25 NA 28.9 5/6/2009
L-120 2020060 50029230640000 NA 0.75 NA 6.8 5/5/2009
L-121A 2030390 50029231380100 NA 22 NA 25.5 6/27/2009
L-122 2030510 50029231470000 NA 2 NA 20.4 6/27/2009
L-123 2051940 50029232900000 NA 2 NA 18.7 6/27/2009
L-124 2050430 50029232550000 NA 1.8 NA 17 6/27/2009
L-200 2040010 50029231910000 NA 1.8 NA 13.5 6/26/2009
L-201 2040460 50029232020000 NA 1.75 NA 15.3 5/6/2009
L-202 2041960 50029232290000 NA 2 NA 17 6/26/2009
L-204 2060920 50029233140000 NA 1.5 NA 5.95 5/6/2009
L-205 2080530 50029233880000 NA 1 NA 12.75 1/10/2009
L-210 2031990 50029231870000 NA 3.25 NA 31.4 5/5/2009
L-211 2040290 50029231970000 NA 1.8 NA 17 6/27/2009
L-212 2050300 50029232520000 NA 1.8 NA 17 6/26l2009
L-213 2060530 50029233080000 NA 2 NA 17 6/25/2009
L-214A 2060270 50029232580100 NA 0.25 NA 10.2 5/6/2009
L-215 2051270 50029232740000 NA 1.5 NA 30.6 5/6/2009
L-216 2040650 50029232060000 NA 1.3 NA 11.9 6/26/2009
L-217 2060750 50029233120000 late blockin conductor NA NA
L-218 2051190 50029232720000 NA 1.7 NA 15.3 6/27/2009
L-219 2071480 50029233760000 surface NA NA
L-220 2080470 50029233870000 NA 2 NA 20.4 6/28/2009
L-221 2080310 50029233850000 NA 1.7 NA 162 6/25/2009
L-250 2051520 50029232810000 NA 3.4 NA 34 6/26/2009
L-50 2051360 50029232770000 NA 1.8 NA 20.4 6/27/2009
L-51 2060590 50029233090000 NA 1.8 NA 77 6/27/2009
Permit to Drill 2050300
MD 8845./
----
l C( .1"tA:;J
DATA SUBMITTAL COMPLIANCE REPORT
5/2/2007
).1 ~.s1 À '1/1.,.. ...{ t Ò 5'
API f.Ic,. 50-029-23252-00-00
Well Name/No. PRUDHOE BAY UN ORIN L-212
Operator BP EXPLORATION (ALASKA) INC
TVD 4758 ,,/ Completion Date 4/19/2005./
Current Statu~~
UIQ
Completion Status 1WINJ
REQUIRED INFORMATION
Mud Log No
Directional Survey .~_
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR, MWD / GR / RES / DEN / NEU / Sonic / PWD, MWD / GR
Well Log Information:
Log/
Data Digital
Type Med/Frmt
{Y?J;, -0 Asc
¡; D A"
14
Ii D A"
I
~CL"
i
fOg
~~
~ C u,
+::
I
~~_LiS
Electr
Dataset
Number
(data taken from Logs Portion of Master Well Data Maint
Name
Directional Survey
Directional Survey
Directional Survey
Directional Survey
Directional Survey
Directional Survey
Pressure
Interval -
Log Log Run OHI
Scale Media No Start Stop CH Received Comments
0 8845 Open 5/27/2005
0 8845 Open 5/27/2005
0 824 Open 5/27/2005 PB 1
0 824 Open 5/27/2005 PB 1
0 14338 Open 5/27/2005 PB2
0 14338 Open 5/27/2005 PB 2
Blu 0 8654 Case Pressure Tempurature
Survey
0 8654 Case Pressure Temperature
Survey 17-Jul-2005
5 Blu 7950 8600 Case 7/25/2006 Injection Profile SPIN.
PRES, TEMP, CCL, GR,
RST ***REVISED*** 16- -
Apr-2006
25 Blu 108 8845 Open 12/7/2006 MD Vision Density Neutron
CDR 24-Apr-2005
w/Graphics
25 Blu 108 8845 Open 12/7/2006 TVD Vision Density
Neutron CDR 24-Apr-2005
w/Graphics
60 8850 Open 12/7/2006 LIS Veri, ROP, GR, NPHI,
DRHO
25 Blu 108 824 Open 12/7/2006 PB1 MD Power-Pulse, GR
25-Mar-2005 w/Graphics
25 Blu 108 824 Open 12/7/2006 PB1 TVD Power-Pulse,
GR 25-Mar-2005
w/Graphics J
60 828 Open 12/7/2006 PB1 LIS veri,. ROP, GR
13826 Pressure
Injection Profile
14278 Neutron
14278 Neutron
14278 Induction/Resistivity
14279 Gamma Ray
14279 Gamma Ray
14279 Induction/Resistivity
DATA SUBMITTAL COMPLIANCE REPORT
5/2/2007
Permit to Drill 2050300
Well Name/No. PRUDHOE BAY UN ORIN L-212
Operator BP EXPLORATION (ALASKA) INC
MD 8845
ILog..?"
I .,..,/
: Log
~G U,
tGg
f~g c U,
4"L09
I
h C t..l)
t: G:
TVD 4758
14280 Neutron
Completion Date 4/19/2005
Completion Status
25 Slu
1WINJ
Current Status 1WINJ
14338 Open 12/7/2006
108
14280 Neutron
25 Slu
108
14338 Open 12/7/2006
14280 Induction/Resistivity
60
14343 Open 12/7/2006
14326 Sonic
14326 I~
14493 Neutron
5 Col
5600
8600 Case 1/10/2007
Cd.~e.-
8622 pPerr" 1 /10/2007
14338 Open 2/20/2007
25 Blu
5609
108
14493 Neutron
25 Blu
108
14338 Open 2/20/2007
1~ Induction/Resistivity
I "ILl")
14493 Neutron
60
14343 Open 2/20/2007
108
14338 Open 2/20/2007
_.~---_.._._~--~--_.,--
Well Cores/Samples Information:
Name
Interval
Start Stop
Sample
Set
Number Comments
Sent
Received
ADDITIONAL INFORMATION
Well Cored? v"ß
Chips Received? ,~
Analysis
Received?
Comments:
Daily History Received?
@
ß/N
Formation Tops
.~"
API No. 50-029-23252-00-00
ute Y
PS2 TVD Vision Density~
Neutron - CDR 6-Apr-2005
w/Graphics C. è.i /L{ l i
PB2 MD Vision Density i
Neutron - CDR 6-,A.pr-2005
w/Graphics C u (ilL
PB2 LIS Veri, ROP, GR,
DRHO,NPHIREPLACED ,
by I:>SN 14493
USIT log w/PDC, GR, CCL
18-Apr-2005
¡.,cS¡ í.
LlS-¥éfi w/Graphics
PB2 MD Vision Den H, J
Neutron, CDR 6-Apr-2005
PB2 TVD Vision Den .'1 _
Neutron, CDR 6-Apr-2d65
FET, ROP, GR, DRHO,
NPHI w/Graphics
PS2 Vision Den Neutron, i
CDR 6-Apr-2005 REVISEDj
data replaces DSN 14280
--- -., --
-
-
Permit to Drill 2050300
MD 8845
TVD 4758
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
5/2/2007
Well Name/No. PRUDHOE BAY UN ORIN L-212
Operator BP EXPLORATION (ALASKA) INC
4/19/2005
Completion Status 1WINJ
Current Status 1WINJ . r1/J UIC Y
Date: d. v/ r{~. _~ '7
---...---
API No. 50-029-23252-00-00
-
e
02/16/2007
Schlumberger
NO. 4146
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
Company: Alaska Oil & Gas Cons Comm
Aftn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Aurora
Borealis
Orion
Well
Job #
Log Description
Date
BL
Color
CD
e
L-117 11626466 IPROFIWFL 01118/07 1
5-124 11485868 CH EDIT USIT PDC-GRj 11/08/06 1
Z-103 40011520 OH EOIT MWD/LWD 02118/05 2 1
Z-103 PB1 40011520 OH EOIT MWO/LWD 02106/05 2 1
L-212 PB2 40011670 OH EDIT MWO/LWD REVISED DATA) 04106/05 2 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) loe
Petrotechnical Data Center LR2-1
900 E Benson Blvd
Anchorage AK 99508-4254
Schlumberger-OCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
Date Delivered
:i"";;-"f) "\~ tf' ?qC\'}
:~ " ;~'~, í/, ;,\ ~ ,l.. t, I',.. j
Received by:
-
() .I c.. dÖS- - 030
;¡t JLI4~
---
6
01108/07
Schlumbergep
NO. 4105
Schlumberger·DCS
2525 Gambell 51, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
U I (!.. So.s--03 Ö
Il...l 3.;)0
Company: Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Polaris
Orion
Well
Job #
Log Description
Date
BL
Color
CD
L-212 11039112 CH EDIT USIT POC-GRI 04/18/05 1 1
S-213AL1 40011201 OH EDIT MWD/LWD 12/20/04 2 1
S-213AL1-01 40011201 OH EDIT MWD/LWD 12125104 2 1 -~
S-213AL2 40011201 OH EOIT MWD/LWD 01/08/05 2 1
S-213AL3 40011201 OH EDIT MWD/LWD 01127/05 2 1
-
--
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc
Petrotechnical Data Center LR2·1
900 E Benson Blvd
Anchorage AK 99508·4254
Date Delivered
Schlumberger-DCS
2525 Gambell 51. Suite 400
Anchorage AK 99503-2838
A TTN Beth
Received by
.
12/06/06
Schlumberger
NO. 4065
5chlumberger-DCS
2525 Gambell 51, Su~e 400
Anchorage, AK 99503-2838
ATTN: Belh
Company: Alaska Oil & Gas Cons Comm
Aftn: Christine Mahnken
333 Wesl71h Ave, Suile 100
Anchorage, AK 99501
Field: Aurora
Orion
Prudhoe Bay
Well
Job #
Log Description
Date
BL
Color
CD
S-121 11366505 MEMORY PROD PROFILE 11/06/06 1
S-28B PB1 40008506 OH EDIT OF MWD/LWD 02101/03 2 1
1-100 11216289 OH EDIT OF MWD/LWD 04113/06 2 1
L-212 40011670 OH EDIT OF MWD/LWD 04113/05 2 1
L-212 PB1 40011670 OH EDIT OF MWD/LWD 03125/05 2 1
L-212 PB2 40011670 OH EDIT OF MWD/LWD 04106/05 2 1
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc
Petrotechnical Data Center LR2-1
900 E Benson Blvd
Anchorage AK 99508-4254
Schlumber
2525 Gamb
Anchorage,
A TTN: Beth
Received by:
Date Delivered
.
u:re 905'- 030
¡t ¡i..tê) 775
-Þ ¡LIt)70¡
-µ 14 c9i50
06/28/06
SdlllnbePglP
NO. 3873
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
:}OS--ð30
Company: Alaska Oil & Gas Cons Comm
Altn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Orion, Aurora,
Borealis, Polaris
Well
Job #
Log Description
Date
BL
Color
CD
V-212 11225953 INJECTION PROFILElWFL 04108/06 1
L-212 11217240 INJECTION PROFILE 04116106 1
L-216 11217241 INJECTION PROFILE 04/17/06 1
L-215 11217242 INJECTION PROFILE 04118/06 1
V-213 REDO 11078450 INJECTION PROFILE 07/01/05 1
.
PLEASE ACKNOWLEOGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
Date Delivered:
~7 / &5/ ()k-;
t I
Schlumberger-OCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838 L
ATTN Beth IJ _
Received by Q- 6
BP Exploration (Alaska) inc.
Petrotechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
.
e
e
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
1/ ".1 I .;
I\~l 1(,1 k, D":>
DATE: Wednesday, October 05, 2005
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
L-212
PRUDHOE BAY UN ORIN L-212
Src: Inspector
_ ,.(!jf:> '4!?
~.....'."'.'.....~
. .....?'
,;,,~
Jr- .
FROM:
John Crisp
Petroleum Inspector
Well Name: PRUDHOE SAY UN ORIN L-212 API Well Number 50-029-23252-00-00 Inspector Name: John Crisp
Insp Num: mitJCr051004114714 Permit Number: 205-030-0 Inspection Date: 10/4/2005
Rei Insp Num
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well I L-212 IType Inj. ! W I TVD 4300 I IA I 370 ! 1610 I 1570 I 1570 I
I
P.T. i 2050300 ITypeTest I SPT i Test psi 1075 ! OA ¡ 180 270 I 270 I 270 i
Interval INITAL P/F P Tubing: 800 800 i 800 : 800 I
Notes
NON-CONFIDENTIAL
Reviewed By:
/(--7..,
P.I. SuprvJt)¡¿...
Comm
Wednesday, October 05, 2005
Page 1 of 1
. STATE OF ALASKA I
ALASKA ~ AND GAS CONSERVATION COMM 310N
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revision: 09/01/05,'$t~,inhíèd:iÒn
1a. Well Status: D Oil DGas D Plugged D Abandoned D Suspended DWAG 1b. Well Class:
20AAC 25.105 20AAC 25.110 D Development D Exploratory
DGINJ IS! WINJ D WDSPL No. of Completions One Other D Stratigraphic IS! Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 4/19/2005 205-030
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 3/24/2005 50- 029-23252-00-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 4/13/2005 PBU L-212i
2575' NSL, 3676' WEL, SEC. 34, T12N, R11E, UM 8. KB Elevation (ft): 15. Field / Pool(s):
Top of Productive Horizon:
3310' NSL, 3313' WEL, SEC. 27, T12N, R11E, UM 77.80' Prudhoe Bay Field / Orion
Schrader Bluff
Total Depth: 9. Plug Back Depth (MD+TVD)
3953' NSL, 3044' WEL. SEC. 27, T12N, R11E, UM 8748 + 4708 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: 583238 5978297 Zone- ASP4 8845 + 4758 Ft ADL 028239
x- y-
--- 11. Depth where SSSV set 17. Land Use Permit:
TPI: x- 583522 y- 5984315 Zone- ASP4
~- (Nipple) 3792' MD
Total Depth: x- 583783 y- 5984962 Zone- ASP4
19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey DYes IS! No N/A MSL 1900' (Approx.)
21. Logs Run:
MWD / GR, MWD / GR / RES I DEN / NEU / Sonic / PWD, MWD I GR / RES I DEN / NEU I PWD, USIT
2. . CASING, liNER AND CEMENTING RECO. i".'~
9~~~G WT. PERf'T. GRADE S!õTTINGOEPTH MD ',:)ETTINGUEPTHTVD '" ... ,1.
.rop·,'BOTTOM TOP.BOTTOMf i···.··i
20" x 34" 215.5# A53 Surface 108' Surface 108' 42" 260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 30' 4055' 30' 2636' 12-1/4" 606 sx Arcticset Lite, 384 sx 'G'
7" 26# L-80 26' 8832' 26' 4751' 8-3/4" 432 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24. ... .i<i ii< <i
i .'.
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Gun Diameter,S spf 4-1/2", 12.6#, L-80 7945'
MD TVD MD TVD 3-1/2", 9.3#, L-80 7945' - 8448' 7885', 8143', 8350'
8050'-8116' 4375' - 4405' 25. ··AClp,. . PEMENT
8156' - 8182' 4423' - 4435' < <, ii
8394' - 8516' 4533' - 4544' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
3000' Freeze Protect with 103 Bbls of Diesel
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
August 18,2005 Water Injection
Date of Test Hours Tested PRODUCTION FOR Oll-BSl GAs-McF W A TER-BSl CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED .. Oll-Bsl GAs-McF W A TER-BSl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". RBDMS BFl SEP 162005
None
ORIGI~~AL
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
28.
GEOLOGIC MARKERS
29.
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Ugnu 4512'
Ugnu MA 6967'
Ugnu MB1 7072'
Ugnu MB2 7231'
Ugnu MC 7427'
Schrader Bluff NA 7539'
Schrader Bluff NB 7596'
Schrader Bluff NC 7706'
Schrader Bluff OA 7914'
Schrader Bluff OBa 8049'
Schrader Bluff OBb 8154'
Schrader Bluff OBc 8273'
Schrader Bluff OBd 8393'
Schrader Bluff OBe 8544'
Schrader Bluff OBf 8625'
Base Schrader Bluff I Top Colville 8716'
2845'
3910'
3951'
4018'
4103'
None
4150'
4174'
4221'
4313'
4374'
4422'
4476'
4533'
4606'
4646'
4692'
30. List of Attachments: Post Rig Work Summary
Signed
Title Technical Assistant
Date
PBU L-212i
Well Number
Prepared By Name/Number:
Drilling Engineer:
Sondra Stewman, 564-4750
AfichaelTrio/o, 564-5774
205-030
Permit No. / A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
e
e
PBU L-212i
Prudhoe Bay Field / Orion Schrader Bluff
50-029-23252-00-00
205-030
Accept:
Spud:
Release:
Ri:
03/23/05
03/24/05
04/19/05
Nabors 9ES
POST-RIG WORK
05/16/05
PULLED 1" SHEAR VALVE AND SET 1" DGLV IN STA. # 5 AT 7696', PULLED RHC PLUG BODY
FROM 83841 (SLM) DRIFTED W/ 2.50 CENT. TEL. AND SAMPLE BAILER TO 8658' CORRECTED MD
PERFS FROM 8349' TO 85161142' RAT HOLE)
07/17/05
PERFORMED MEMORY JEWELRY LOG / SBHPS (SEE DATA TAB # 3), IN PROCESS OF
DEPRESSING FUILD LEVEL BELOW TUBING TAIL
07/18/05
T/I/0=1540NAC/150, TEMP=SI. TBG FL (SCHLUMBERGER N2 DEPRESS ON TBG). INITIAL TBG FL
AT 5940' (90 BBLS), TBG FL DECREASED 3438' (52 BBLS) AND THE TBGP INCREASED 60 PSI
FROM 7-17-05. TBG FL AFTER N2 DEPRESS AT 6695' (102 BBLS). FWHP= 2100NAC/150.
07/19/05
EVACUATE TBG WITH 1140 GALlS N2 TO BELOW THE TUBING TAIL TO -84881 MD IN
PREPARATION FOR WELL TESTING. SET 31/2" PX PLUG BODY AT 8395' SLM. RAN 31/2"
CHECK SET.
07/20/05
RAN CHECK SET, CAME BACK SHEARED. SET PRONG (1 3/4" FN, 1.81" OD, 96" OAL.) AT 8381'
SLM. TESTED PLUG FROM 1600 PSI TO 850 PSI, GOOD TEST. SET C-SUB AT 8379' SLM.
PULLED ST#1 DGLV 8262 SLM.
07/21/05
SET RKFS IN ST#1 AT 8263 SLM. PULLED CATCHER AT 8383 SLM. SET NIPPLE REDUCER IN
4.5" X-NIPPLE AT 7806 SLM. RAN CHECKSET TO X-LOCK AT 7806 SLM. GOOD SET. NIPPLE
REDUCER OAL 38" SET AT 7806 SLM 7821 MD.
07/23/05
CTU #5, JET PUMP/SAMPLE; WELL SHUT IN UPON ARRIVAL. MIRU. PERFORM BOP TEST ON
REBUILT BOP'S. MU AND TEST BAKER MHA. MU JET PUMP ASSY. HAVE TROUBLE WITH
THREAD MAKE-UP ON XO TO PUMP. BREAK OUT PUMP/XO AND ROAD TO BAKER MACHINE
SHOP FOR INSPECTION. ELECT TO USE DOWN TIME TO MOVE RETURN TANKS TO
ACCOMMODATE NEXT JOB. XO THREADS CHASED AND PUMP MADE UP AT BAKER SHOP.
07/24/05
CTU #5, JET PUMP/SAMPLE; CONT' FROM WSR 7/23/05 ... MU AND RIH WITH JET PUMP
ASSEMBLY. STING IN TO NIPPLE REDUCER W/ JET PUMP. SET 1000 # DOWN WT. ASRC
BLEEDING DOWN PRESSURE THRU TEST SEP & SENDING GAS RETURNS TO L-118 & FLUID
RETURNS TO FLOW BACK TANKS. CONSULT W/TOWN ENG. & WAS DECIDED TO BYPASS
TEST SEP. & GO STRAIGHT TO TANK TILL WE GET THE N2 COLUMN BLED DOWN & WELL
FLUID PACKED. LOST CTP & CONSULT W/TOWN ENG. & WAS DECIDED TO POOH TO CHECK
JET PUMP & BURST DISC IN MHA. CIRCULATE MIN. RATE WHILE POOH. ON SURFACE & BHA
HAD OIL ON TOOLS & BURST DISC WAS BAD. DHD DID FLUID LEVEL SHOT & FLUID IS AROUND
26401. REPLACE PACKING ON PUMP. REPLACED BURST DISC W/ SAME (5 K PSI). RBIH WITH
JET PUMP ASSEMBLY. STING IN TO NIPPLE AT 7826' CTMD. BEGIN PUMPING KCL DOWN COIL.
...
PBU L-212i
Page 2
e
e
07/25/05
CTU #5, JET PUMP/SAMPLE; CO NT' FROM WSR 7/24/05 ... CONTINUE JET PUMPING WITH NO
RETURNS. VARY POWER FLUID RATES FROM 0.3 UP TO 0.5 BPM W/ NO RETURNS. DROPPED
POWER FLUID RATE TO ABSOLUTE MINIMUM OF 0.25 BPM AND FINALLY ATTAINED FLUID
RETURNS. FOUND THAT 0.25 BPM APPEARS TO BE OPTIMUM POWER FLUID RATE. INITIAL
SAMPLES HAD WATER CUTS BELOW 10% BUT SOON INCREASED TO 98%+. STOP PUMP
AFTER DISCUSSING W/ TOWN ENGINEERS THE WELL CONDITIONS. PUH & UNSTING FROM
NIPPLE, LET WELLBORE FLUIDS SWAP AND STABILIZE. STAB PUMP BACK INTO NIPPLE AND
RESUME PUMPING. START GETTING GAS IN RETURNS, ALONG WITH 99 TO 100% WATER CUT.
DROP BALL AND OPEN CIRC. SUB. CIRCULATE BOTTOMS UP.
07/26/05
CTU #5, JET PUMP/SAMPLE; CO NT' FROM WSR 7/25/05 n. CIRCULATE BOTTOMS UP. RETURNS
CLEAN AND 100% WATER. POOH WITH JET PUMP. FREEZE PROTECT WELL TO 2000' TVDSS
WITH 50/50 METHANOL. PUMP LOOKS IN GOOD CONDITION. PULLED REDUCING NIPPLE
FROM X-NIP AT 78031 SLM.
07/27/05
T/I/O=200/0/100. PUMP 30 BBLS SEAWATER AT 160* DOWN TBG FOLLOWED BY 25 BBLS
DIESEL-XYLENE. PUMP ANOTHER 120 BBLS SEAWATER AT 190* DOWN TBG.
FWP=1250/450/500. SET 31/211 WHIDDON C-SUB AT 8322' SLM
PULLED RKFS FROM STA #1 ---- 8261' SLM & SET DGLV
07/28/05
MIT -T TO 2500# (PASSED) PULLED DGLV FROM STA #3---- 8064' SLM & SET RKFS
PULLED 31/211 WHIDDON C-SUB AT 83231 WLM SET NIPPLE REDUCER (3811 OAL) IN X-NIP AT
7803' WLM MIRU CTU #5. MU MHA W/ JET PUMP. RIH. STING INTO XN NIPPLE REDUCER. PMP'G
1% KCL FOR POWER FLUID... TESTING OBA
07/29/05
OBTAIN OIL SAMPLE FROM OBA PERFORATIONS WITH WEATHERFORD JET PUMP.
PROBLEMS GETTING PUMP TO MOVE FLUID. VARY INJECTION RATE AND NO RECOVERY TO
ASRC TEST SEPERATOR. STING OUT / IN REDUCING NIPPLE AND TRY AGAIN. CONTINUE TO
PUMP WHILE VARYING INJECTION RATE. NO RECOVERY. PUMP DOWN BACKSIDE IN
ATTEMPT TO BACK FLUSH JET PUMP. PRESSURED UP TO 1000 PSI AND UNABLE TO INJECT.
SLOW BLEED OFF OF PRESSURE. PRESSURE UP TO 1250 PSI AND PRESSURE BROKE BACK
TO 250 PSI AT 0.2 BPM. PUMP DOWN COIL. 1 TO 1 RETURNS TO ASRC TEST SEPERATOR. CT
GAINED 2000 LBS. ATTEMPT TO SET DOWN 1000 LBS ON JET PUMP AND X-LOCK REDUCING
NIPPLE NO LONGER LATCHED IN X NIPPLE AT 7821'. RIH TO 7866'. ATTEMPT TO PUH AND
REDUCING NIPPLE STUCK IN X NIPPLE AT 7821'. ATTEMPT TO PUMP DOWN CT AND RETURNS
DYING OFF TO ASRC TEST SEPERATOR. ATTEMPT TO STING JET PUMP OUT OF REDUCING
NIPPLE PULLING MAX WEIGHT. NO SUCCESS. ATTEMPT TO PUMP DOWN BACKSIDE.
PRESSURE UP TO 1750 PSI. PULL MAX WEIGHT. NO SUCCESS. INJECT DOWN COIL PULLING
MAX WEIGHT. NO SUCCESS. DROP 5/811 ALUMINUM BALL. OPEN CIRC SUB. PUMP DOWN CT
WHILE PULLING MAX WEIGHT. NO SUCCESS. DROP 3/411 STEEL BALL TO DISCONNECT. POOH.
MU MHA WITH JARS, WT BAR, ACCELERATOR AND GS SPEAR. OAL = 24.73'. RIH. START
FISHING OPERATIONS. UNABLE TO LATCH. POOH. ADD HYDRAULIC CENTRALIZER ABOVE GS
SPEAR. LATCH INTO FISH. JAR 4 TIMES POH. FREEZE PROTECT W/ 26 BBLS METH.
07/30/05
POH AFTER JARRING ON STUCK WEATHERFORD JET PUMP. RECOVERED WEATHERFORD
JET PUMP. (NO VISIBLE MARKS ON PUMP OR PACKING). LD BHA....... RD AND MOVE TO K-06
TURN WELL OVER TO SLICK LINE FOR RESETTING 4-1/2 X LOCK WITH 2-7/8 XN NIPPLE
PBU L-212i
Page 3
e
.
07/31/05
PULL NIPPLE REDUCER FROM 7802' SLM. SET 48' X-LOCK W/2.205 XN-NIPPLES REDUCER AT
7803' SLM. SET 2 7/8" CAT STANDING VALVE AT 7800' SLM, MIT-T TO 2500 PSI PASS. PULL CAT
STANDING VALVE. JET PUMP OBA FOR OIL SAMPLES (2ND ATTEMPT). RIH WI WEATHERFORD
JET PUMP
08/01/05
RIH WI WEATHERFORD JET PUMP. STING INTO XN NIPPLE REDUCER AT 7821'. TESTING OBA
PERFS THROUGH ASRC TEST SEPERATOR PUMPING 0.4 BPM 1% KCL AS POWER FLUID.
RECOVERING - 0.8 BPM. TOTAL PUMPED AT REPORT TIME: 595 BBLS WITH A RECOVERY OF
1171 BBLS. 100% WATER
08/02/05
TESTING THE OBA WITH WEATHERFORD JET PUMP THROUGH ASRC TEST SEPERATOR
PUMPING 0.4 BPM 1% KCL AS POWER FLUID. TOTAL PUMPED 955 BBLS WITH A TOTAL
RECOVERY OF 1871 BBLS. 100% WATER. DECISION BY TOWN ENGINEER TO DISCONTINUE
TESTING
08/03/05
FREEZE PROTECT TBG W/40 BBLS 60/40 METHANOL. FINAL WHP'S=350/0/80
08/04/05
DRIFTED WI 3.70 CENT AND 3.80 GAUGE RING TO 7804' (SLM), PULLED 41/2 X LOCK WI 31/2
NIPPLE REDUCER FROM 7804' (SLM).
08/05/05
SET 3112 WHIDDEN CATCHER AT 8313 SLM, PULLED 1.5 IIDGLV (RK) FROM STA # 1 - 8260'
SLM.SET 1S RKPFS IN STA. # 1 - 8262' SLM. MADE TWO RUNS W/10' OF 2.25" P. BAILER TO
8322' SLM.
08/06/05
MADE SIX RUNS WI 10' * 2.25" P.BAILER RECOVERED SAND FROM 8328' (SLM) TO 8355' (SLM).
08/12/05
MIRU. RIH WITH 2.011 JSN FOR FCO. TAG AT 8391' CTMD. WASH ON TOP OF PX PLUG WI
PRONG & CHASE OUT AT 80%. FLOPRO AT OPEN TOP TANK & RETURNS REAL DIRTY.
RETURNS CLEANING UP & CONTINUE OUT HOLE.
08/13/05
FISH 3 11211 PX PLUG WI PRONG; CONTINUED FROM WSR ON 8/12/05... POOH WI 2.011 JSN. RIH
TO FISH PX PRONG WI HYD OVERSHOT DRESSED FOR 1.7511 CATCH. LATCHED PRONG AND
POOH. RECOVERED PRONG. RIH WI 2.511 HYD. IIGSII TO PULL PLUG. LATCHED PLUG AT 8410'
CTMD. TOPPED OFF WELL WITH 42 BBLS 50/50 METH. WHILE POOH. RECOVERED 3 1/211 PX
PLUG.
~D5-0?JD
Static Temperature/Pressure Survey
H'" WEll $.
~V' ~
4..I2S~(I~
... ~.
.:&' ~
'"" .,.
PRoAcTivE DiAGNOSTic SERVicES
B.P. Exploration (Alaska), Inc.
L-212i
Orion
North Slope
Lubricator Stop MD. = 0'
Elapsed Time Temperature Pressure
(Minutes) (Deg. F) (psi a)
0.0 44.8 150.8
0.5 44.9 150.9
1.0 45.0 151.0
1.5 45.0 151.0
2.0 45.0 151.1
2.5 45.0 151.2
3.0 45.0 151.3
3.5 44.9 151.3
4.0 44.9 151.4
4.5 44.9 151.5
5.0 44.8 151.5
5.5 44.8 151.6
6.0 44.8 151.6
6.5 44.9 151.7
7.0 44.9 151.8
7.5 44.9 151.8
8.0 44.7 151.9
8.5 44.7 151.9
9.0 44.8 152.0
9.5 44.7 152.1
10.0 44.7 152.1
10.5 44.6 152.2
11.0 44.5 152.2
11.5 44.6 152.3
12.0 44.6 152.3
12.5 44.5 152.4
13.0 44.6 152.4
13.5 44.7 152.5
14.0 44.7 152.6
14.5 44.6 152.6
15.0 44.6 152.7
AVERAGE 44.8 151.8
Date: July 17, 2005
Start time: 0:45:00
Temperature Data
50
45 ~
-
- - -
.- -
...
- -
..._m. m._...._m._h.._hh .h - h.
- ----
u.
2'40
c
......................
35
..unu..... ...............,...... "'nnun.' n..nnn................
30
o 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Minutes
Pressure Data
170
165
........ ................,...........uuH·..
c:r:
¡¡j 160
Q.
nn...........__... .
155 m..mh··hhm
...........n. .......___,..__.....
150 "':'
,-
0 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Minutes
Page 1
-
-
-
- -
-
-
BP Exploration (Alaska), Inc.
L-212i
Orion
North Slope
4,387'TVDss MD. = 8,077'
Static Temperature/Pressure Survey
~t.'" WEll $,
q,.~~f"('~
lot ~
~ ~
,.. .,.
PRoAcTin DiAqN05TÍC SERViCE!
Elapsed Time Temperature Pressure
(Minutes) (Deg. F) (psia)
0.0 85.1 1869.5
0.5 85.1 1869.5
1.0 85.1 1869.5
1.5 85.1 1869.5
2.0 85.1 1869.5
2.5 85.1 1869.5
3.0 85.1 1869.5
3.5 85.1 1869.5
4.0 85.1 1869.5
4.5 85.1 1869.5
5.0 85.1 1869.5
5.5 85.1 1869.5
6.0 85.1 1869.5
6.5 85.1 1869.5
7.0 85.1 1869.5
7.5 85.1 1869.5
8.0 85.1 1869.5
8.5 85.0 1869.5
9.0 85.0 1869.5
9.5 85.0 1869.5
10.0 85.1 1869.5
10.5 85.1 1869.5
11.0 85.0 1869.5
11.5 85.0 1869.5
12.0 85.1 1869.5
12.5 85.0 1869.5
13.0 85.0 1869.5
13.5 85.1 1869.5
14.0 85.0 1869.5
14.5 85.0 1869.5
15.0 85.1 1869.5
AVERAGE 85.1 1869.5
Date: July 17, 2005
Start time: 04:02:00
Temperature Data
94
92 ummmuuUUUmmmmuuu ... ... .ummum.
............... ·············............................uu·u.....·.
u. 90
i
Q 88
..uuuu········.._.nnn.nnnnu_···..·..................u..'"'OUn"""'."_"..,,__._.
""..·n.nu.................______............... . ............__n.....u ..n____......__..__.___........................
86
- - ~ - -
----- - - - -
84
0 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Minutes
Pressure Data
1967
1947
"_'u ........n ................... __n_nnnnn__._____........
.............---...............---.
n..n..... .............__
___..n................. .... ........ununnnnnn.____
1927
u·.....................__...........______________... ..................... ...... ......................................._........n....
<C
ëi)
a.
1907
........................................... ......
.............................. ··········..··....·....··...·......n..........
··....·..............n................................
1887
······.··.··....................n..nn..nn............ ........................
··················...·...··...........n.n....nn.........,..........................n.................
1867
o
- -
--~- -
2 3 4 5
6 7 8 9 10 11 12 13 14 15
Minutes
Page 1
BP Exploration (Alaska). Inc.
L-212í
Orion
North Slape
4,487'TVDss Mil = 8,296'
Static Temperature/Pressure Survey
"iotA WEll $,
~" :.0
~..~~~
... ~
~ ~
,.. '"
PRoAcTiVE DiAGNosTÎc SERVicES
Elapsed Time Temperature Pressure
(Minutes) (Deg. F) (psia)
0.0 87.38 1917.22
2.0 87.38 1917.22
4.0 87.38 1917.21
6.0 87.38 1917.21
8.0 87.38 1917.21
10.0 87.39 1917.21
12.0 87.38 1917 .20
14.0 87.37 1917.20
16.0 87.38 1917.20
18.0 87.38 1917.19
20.0 87.37 1917.19
22.0 87.38 1917.19
24.0 87.38 1917.19
26.0 87.37 1917.19
28.0 87.39 1917.18
30.0 87.37 1917.18
32.0 87.38 1917.18
34.0 87.38 1917.18
36.0 87.38 1917.17
38.0 87.38 1917.17
40.0 87.38 1917.17
42.0 87.38 1917.17
44.0 87.38 1917.17
46.0 87.39 1917.17
48.0 87.39 1917.17
50.0 87.38 1917.16
52.0 87.39 1917.16
54.0 87.38 1917.16
56.0 87.39 1917.16
58.0 87.39 1917.16
60.0 87.39 1917.16
AVERAGE 87.38 1917.18
Date: July 17, 2005
Start time: 03:15:00
Temperature Data
94
92
..............u..u.............. ...............nu.........................
u. 90
i'
Q 88
.....................uu...... ..............................__ .nnn.......__............ _.0
__....... ... hnnn .0. un
....................0__.. u. ,",unO... ...onunno n ......h
.................. . ..-........
...........:;,:
...............................
...
-
86
u un....n.............................
84
o 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60
Minutes
Pressure Data
1967
1947
·········.·._n............
nnn_ ........................
cC
iñ
a..
1927
............_..........._n_
...n............__.._...............
........----..--.................... .......................--.....
-------- -- - -
-
-
1907
................................. ................................ n.__....................................
................................
1887
....... ................. ..............................-- ..--..................
............................
1867
o 4
I ,
8 12 16 20 24 28 32 36 40 44 48 52 56 60
Minutes
Page 4
BP. Exploration [Alaska}, Inc.
L-212i
Orion
North Slope
4,588' TVDss Mo. = 8,507'
Statíc Temperature/Pressure Survey
~~'" WEll $.
4~~
'" ~.
..:!: '!t
,.. II>
PRoACTivf DIAqNOSTÎC SERYlcu
Elapsed Time Temperature Pressure
(Minutes) (Deg. F) (psi a)
0.0 89.4 1965.0
0.5 89.4 1965.0
1.0 89.4 1965.0
1.5 89.4 1965.0
2.0 89.4 1965.0
2.5 89.4 1965.1
3.0 89.4 1965.1
3.5 89.4 1965.1
4.0 89.4 1965.1
4.5 89.4 1965.1
5.0 89.4 1965.1
5.5 89.4 1965.1
6.0 89.4 1965.1
6.5 89.4 1965.1
7.0 89.4 1965.1
7.5 89.4 1965.1
8.0 89.4 1965.1
8.5 89.4 1965.1
9.0 89.4 1965.1
9.5 89.4 1965.1
10.0 89.4 1965.1
10.5 89.4 1965.1
11.0 89.4 1965.1
11.5 89.4 1965.1
12.0 89.4 1965.1
12.5 89.4 1965.1
13.0 89.4 1965.1
13.5 89.4 1965.1
14.0 89.4 1965.1
14.5 89.4 1965.1
15.0 89.4 1965.1
AVERAGE 89.4 1965.1
Date: July 17, 2005
Start time: 02:58:00
Temperature Data
94
92
.....n__.......__o__....__.............
11..90
i
Q 88
nu.....................h.__.... un____..__.__.....................
--................... ..
....__u..............................
86
..·.........u..........__.
84
o 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Minutes
Pressure Data
1967
1947
.....n__________ ......n................................
.............................. ....n.......____.__.......... ................n.._...............
1927
................................... .........----................--........
...--....--.........--. ..........................
s;
II)
ø.
1907
--..........................
.n........................... ...nn
1887
.__........" ..... .n. nnunu...'"'''' '.'..n'" __...
nuu....................... ..n..............................
1867
o 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Minutes
Page 1
BP. Exploration (Alaska), Inc.
L-212i
Orion
North Slope
Lubricator Stop MD. = 0'
Static Temperature/Pressure Survey
~~'" WEll $,
~" :.0
q,,4'I25(t'~
'" (::'.
..: ~
¡.. '"
PROACTin Di"qNCKTic SERVi£E:S
Elapsed Time Temperature Pressure
(Minutes) (Deg. F) (psia)
0.0 35.2 159.8
0.5 35.3 159.8
1.0 35.2 159.8
1.5 35.1 159.8
2.0 35.2 159.8
2.5 35.2 159.8
3.0 35.2 159.8
3.5 35.2 159.8
4.0 35.3 159.8
4.5 35.3 159.8
5.0 35.4 159.8
5.5 35.4 159.8
6.0 35.5 159.8
6.5 35.5 159.8
7.0 35.4 159.8
7.5 35.4 159.8
8.0 35.4 159.8
8.5 35.4 159.8
9.0 35.4 159.8
9.5 35.5 159.8
10.0 35.5 159.8
10.5 35.6 159.8
11.0 35.5 159.8
11.5 35.5 159.8
12.0 35.6 159.8
12.5 35.6 159.8
13.0 35.8 159.8
13.5 35.8 159.8
14.0 35.7 159.8
14.5 35.7 159.8
15.0 35.7 159.8
AVERAGE 35.4 159.8
Date: July 17, 2005
Start time: 05:10:00
Temperature Data
50
45mmuumuuuum .. ....m..uuu.mummummmmmmmmmuum.m
u..
~ 40 ummuumm UUUUuU.uu.UmUm .
Q
35 --
- - -
~ -
- -
- - - - -
m .m .m m.~u_u.. U
uumu~.
....nn......... .............._________ _ _n.....__...._...__.
30
o 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Minutes
Pressure Data
170
165 m'uUmummmmmmmummmUmmu umuu m mum Um m. UU.UmUm .
~ 160
a.
-----
. . . ... ...
- ----- ---
- - -
m_ _._m_._m
155
uu_..................................... ..............n_nhn..._............____...un__uuuuu..__uuU__".u.._.......__......... ................__n......
......--.--------......
150
o 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Minutes
Page 1
.
SCHLUMBERGER
Survey report
Client.............. .....: BP Exploration (Alaska) Inc.
Field. .. . . . . . . . . . . . . . . . . .: Orion
Well. . . . . . . . . . . . . . . . . . . . .: L-212
API number...... .........: 50-029-23252-00
Engineer.......... .......: S. Moy
RIG: . . . . . . . . . . . . . . . . . . . . .: NABORS 9ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.. ...: Minimum curvature
Method for DLS...... .....: Mason & Taylor
----- Depth reference -----------------------
Permanent datum... .......: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 52.00 ft
KB above permanent.......: N/A Top Drive ft
DF above permanent..... ..: 77.80 ft
----- Vertical section origin----------------
Latitude (+N/S-). ...... ..: 0.00 ft
Departure (+E/W-)... .....: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-) .... .....: -999.25 ft
Departure (+E/W-).. ......: -999.25 ft
Azimuth from Vsect Origin to target: 355.00 degrees
>->
o
"1
\
a
\¡J
t7
[(c)2005 IDEAL ID9_1C_01.4]
14-Apr-2005 11:02:23
Spud date....... .... ... ..:
Last survey date..... ....:
Total accepted surveys...:
MD of first survey.......:
MD of last survey...... ..:
Page
1 of 5
24-Mar-05
14-Apr-05
94
0.00 ft
8845.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2004
Magnetic date............: 23-Mar-2005
Magnetic field strength..: 1152.14 HCNT
Magnetic dec (+E/W-).. ...: 24.54 degrees
Magnetic dip......... ....: 80.81 degrees
----- MWD survey Reference
Reference G......... .....:
Reference H...... ..... ...:
Reference Dip........ ....:
Tolerance of G...........:
Tolerance of H...........:
Tolerance of Dip.........:
Criteria ---------
1002.68 mGal
1152.14 HCNT
80.81 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
.
----- Corrections ---------------------------
Magnetic dec (+E/W-) .....: 24.54 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-). ...: 24.54 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shel1 Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
SCHLUMBERGER Survey Report
14-Apr-2005 11:02:23
Page
2 of 5
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
DLS
(degl
100f)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
1
2
3
4
5
0.00
299.00
392.31
485.07
577.34
0.00
0.41
2.02
4.39
7.77
10.66
11.11
13.31
14.74
17.38
20.67
25.38
29.98
35.76
40.81
47.75
49.59
54.48
57.31
58.21
60.36
63.62
66.04
65.23
64.24
65.24
64.32
65.45
64.69
65.80
0.00
37.21
332.10
1. 61
41. 49
57.18
38.65
22.94
8.33
351.16
346.36
346.06
347.37
350.54
352.28
354.69
355.40
354.18
353.97
354.05
354.89
355.24
354.90
354.43
354.54
354.36
354.22
353.55
353.78
353.81
[(c)2005 IDEAL ID9_1C_Ol.4J
6
7
8
9
10
674.38
765.11
860.95
956.01
1050.53
11
12
13
14
15
1145.04
1240.42
1336.39
1432.00
1526.04
16
17
18
19
20
1619.71
1718.76
1812.17
1906.71
2001.62
21
22
23
24
25
2096.34
2190.19
2285.89
2380.61
2475.06
26
27
28
29
30
2569.17
2664.41
2759.30
2853.30
2949.72
0.00
299.00
93.31
92.76
92.27
97.04
90.73
95.84
95.06
94.52
94.51
95.38
95.97
95.61
94.04
93.67
99.05
93.41
94.54
94.91
94.72
93.85
95.70
94.72
94.45
94.11
95.24
94.89
94.00
96.42
0.00
299.00
392.29
484.90
576.67
672.47
761. 59
855.28
947.54
1038.41
1127.75
1215.51
1300.47
1380.75
1454.54
1521.57
1586.98
1644.43
1697.43
1748.06
1796.44
1840.51
1881.21
1920.28
1960.59
2000.75
2041. 33
2081.61
2121.23
2161.60
0.00
0.79
2.55
7.59
15.40
24.10
34.35
50.78
72.22
98.03
128.61
165.47
209.58
261.15
319.28
384.61
458.99
532.60
610.87
691.13
772.55
855.40
942.00
1028.29
1113 .70
1198.80
1284.96
1370.86
1456.07
1543.61
0.00
0.85
2.57
7.57
15.77
25.56
36.93
54.31
76.36
102.23
132.40
168.62
212.00
262.91
320.51
385.44
459.54
532.85
610.70
690.54
771.59
854.13
940.42
1026.33
1111. 34
1196.05
1281.79
1367.22
1451.94
1538.98
0.00
0.65
0.08
-0.59
3.65
15.54
28.06
38.13
44.15
43.72
37.61
28.72
18.51
8.69
0.04
-7.29
-13.71
-20.42
-28.50
-36.88
-44.72
-51.84
-59.29
-67.31
-75.52
-83.75
-92.32
-101.48
-110.88
-120.35
0.00
1. 07
2.57
7.59
16.19
29.91
46.38
66.36
88.21
111. 19
13 7.64
171.04
212.81
263.06
320.51
385.51
459.74
533.24
611.37
691. 53
772.89
855.70
942.28
1028.53
1113.91
1198.98
1285.11
1370.98
1456.16
1543.68
0.00
37.21
1. 77
355.57
13.02
31.30
37.22
35.07
30.03
23.15
15.86
9.66
4.99
1. 89
0.01
358.92
358.29
357.81
357.33
356.94
356.68
356.53
356.39
356.25
356.11
355.99
355.88
355.76
355.63
355.53
0.00
0.14
2.02
3.03
5.66
3.92
3.87
4.14
4.00
5.72
3.85
4.94
4.83
6.31
5.49
7.62
1. 93
5.34
3.00
0.95
2.39
3.49
2.55
0.97
1. 05
1. 08
0.98
1. 35
0.84
1.15
------
------
Srvy Tool
tool Corr
type (deg)
------
------
TIP None
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
--------
--------
Seq Measured
# depth
(ft)
--------
--------
31
32
33
34
35
3045.89
3141. 51
3238.62
3334.04
3428.32
36
37
38
39
40
3521.47
3613.35
3708.01
3802.85
3895.94
41
42
43
44
45
3984.97
4075.00
4155.13
4208.25
4300.68
46
47
48
49
50
4392.48
4488.37
4580.92
4674.50
4768.31
51
52
53
54
55
4860.90
4953.49
5046.86
5139.37
5232.66
56
57
58
59
60
5326.67
5419.89
5513.49
5606.46
5700.22
------
------
Incl
angle
(deg)
------
------
64.60
64.82
65.32
65.52
65.21
64.85
64.23
64.59
63.97
63.55
63.39
63.29
64.03
62.63
62.57
62.44
62.34
61. 58
62.48
62.37
61. 99
60.89
60.37
63.94
66.49
65.95
65.27
64.76
63.81
63.66
-------
-------
Azimuth
angle
(deg)
-------
-------
353.95
353.18
354.12
353.52
353.32
353.11
352.93
354.99
354.38
354.58
353.94
356.14
355.26
355.29
356.62
356.42
355.84
358.98
358.82
357.80
359.14
0.53
1. 81
3.27
2.64
2.88
3.16
3.02
2.58
1. 83
[(c)2005 IDEAL ID9_1C_01.4J
------
------
Course
length
(ft)
------
------
96.17
95.62
97.11
95.42
94.28
93.15
91. 88
94.66
94.84
93.09
89.03
90.03
80.13
53.12
92.43
91. 80
95.89
92.55
93.58
93.81
92.59
92.59
93.37
92.51
93.29
94.01
93.22
93.60
92.97
93.76
14-Apr-2005 11:02:23
--------
--------
TVD
depth
(ft)
--------
--------
2201.94
2242.79
2283.72
2323.42
2362.72
2402.04
2441. 53
2482.42
2523.58
2564.74
2604.51
2644.91
2680.46
2704.30
2746.84
2789.22
2833.66
2877.18
2921.07
2964.49
3007.71
3051.97
3097.77
3140.97
3180.08
3217.99
3256.48
3296.01
3336.35
3377.84
--------
--------
Vertical
section
(ft)
--------
--------
1630.90
1717.32
1805.36
1892.11
1977.78
2062.18
2145.09
2230.44
2315.88
2399.38
2479.03
2559.48
2631.28
2678.75
2760.79
2842.20
2927.15
3008.75
3091. 21
3174.22
3255.95
3336.98
3417.88
3498.95
3582.83
3668.07
3752.14
3836.13
3919.12
4002.54
----------------
----------------
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
----------------
----------------
1625.78
1711. 69
1799.21
1885.48
1970.62
2054.47
2136.81
2221.70
2306.78
2389.89
2469.14
2549.29
2620.90
2668.21
2750.06
2831.34
2916.12
2997.70
3080.34
3163.45
3245.31
3326.63
3407.98
3489.68
3574.26
3660.18
3744.97
3829.68
3913.34
3997.36
-129.65
-139.34
-149.08
-158.42
-168.24
-178.22
-188.30
-197.28
-205.20
-213.23
-221.19
-228.15
-233.54
-237.45
-243.23
-248.18
-253.91
-257.61
-259.20
-261.65
-263.84
-264.08
-262.42
-258.78
-254.42
-250.27
-245.80
-241.23
-237.13
-233.90
Page
3 of 5
---------------
---------------
Total
displ
(ft)
At
Azim
(deg)
---------------
---------------
1630.94
1717.36
1805.38
1892.12
1977.78
2062.18
2145.09
2230.44
2315.89
2399.38
2479.03
2559.48
2631.28
2678.75
2760.80
2842.20
2927.15
3008.75
3091.22
3174.25
3256.02
3337.09
3418.07
3499.26
3583.30
3668.73
3753.02
3837.27
3920.52
4004.20
355.44
355.35
355.26
355.20
355.12
355.04
354.96
354.93
354.92
354.90
354.88
354.89
354.91
354.91
354.95
354.99
355.02
355.09
355.19
355.27
355.35
355.46
355.60
355.76
355.93
356.09
356.24
356.40
356.53
356.65
DLS
(deg/
100f)
1.25
0.76
1. 02
0.61
0.38
0.44
0.70
2.00
0.87
0.49
0.67
2.19
1. 35
2.64
1.28
0.24
0.55
3.10
0.97
0.97
1. 34
1. 77
1. 32
4.10
2.80
0.62
0.78
0.56
1.11
0.73
-----
------
------
Srvy Tool
tool Corr
type (deg)
-----
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
14-Apr-2005 11:02:23
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Page
4 of 5
Seq Measured
# depth
(ft)
--------
---
--------
61
62
63
64
65
5795.20
5888.55
5981.78
6076.05
6169.84
66
67
68
69
70
6262.68
6354.07
6447.26
6541. 58
6634.92
71
72
73
74
75
6727.71
6821. 27
6915.63
7008.74
7100.99
76
77
78
79
80
7194.38
7286.90
7381.09
7474.50
7567.61
81
82
83
84
85
7660.82
7753.06
7846.75
7940.82
8034.58
86
87
88
89
90
8127.00
8220.99
8314.22
8408.07
8501.46
Incl
angle
(deg)
Azimuth
angle
(deg)
------ -------
------ -------
63.50
64.47
63.69
63.27
62.70
64.10
64.97
64.76
66.55
67.93
67.22
67.43
67.13
67.01
65.43
64.89
64.34
64.63
64.62
65.06
64.80
64.12
63.69
63.19
62.77
63.08
62.76
62.12
61.44
60.78
0.66
0.79
1. 36
1.27
3.45
5.87
10.47
12.84
15.21
21. 31
20.75
21. 07
21. 41
21.77
22.18
22.72
23.93
23.52
24.95
23.48
22.48
23.76
22.65
22.12
22.23
22.53
22.31
22.75
23.68
22.33
[(c)2005 IDEAL ID9_1C_01.4]
Course
length
(ft)
------
------
94.98
93.35
93.23
94.27
93.79
92.84
91. 39
93.19
94.32
93.34
92.79
93.56
94.36
93.11
92.25
93.39
92.52
94.19
93.41
93.11
93.21
92.24
93.69
94.07
93.76
92.42
93.99
93.23
93.85
93.39
TVD
depth
(ft)
--------
--------
3420.11
3461.05
3501.80
3543.90
3586.50
3628.07
3667.39
3706.97
3745.86
3782.00
3817.39
3853.46
3889.91
3926.18
3963.38
4002.61
4042.27
4082.85
4122.88
4162.47
4201.96
4241.73
4282.94
4325.00
4367.60
4409.67
4452.45
4495.59
4539.97
4585.09
Vertical
section
(ft)
--------
--------
4087.09
4170.56
4253.94
4337.78
4420.64
4502.46
4582.77
4663.59
4744.82
4823.83
4900.90
4978.55
5056.62
5133.31
5208.54
5283.74
5357.32
5431. 87
5505.51
5579.06
5653.62
5727.02
5801.17
5875.88
5950.19
6023.26
6097.55
6170.84
6243.71
6315.90
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
----------------
----------------
4082.40
4166.28
4250.12
4334.45
4417 . 93
4500.65
4582.29
4664.91
4748.27
4829.95
4910.01
4990.65
5071.77
5151.51
5229.79
5308.12
5384.87
5462.69
5539.65
5616.51
5694.24
5770.78
5848.11
5925.91
6003.26
6079.35
6156.71
6233.05
6309.05
6384.31
-232.05
-230.99
-229.42
-227.48
-224.04
-217 .29
-205.56
-188.52
-167.68
-140.71
-109.93
-79.12
-47.59
-16.03
15.55
47.92
81. 01
115.21
149.85
184.42
217.38
250.06
283.21
315.25
346.78
378.11
410.03
441.70
474.29
506.25
At
Azim
(deg)
---------------
---------------
4088.99
4172.68
4256.31
4340.41
4423.60
4505.90
4586.90
4668.72
4751. 23
4832.00
4911. 24
4991.28
5072.00
5151.54
5229.82
5308.34
5385.48
5463.91
5541. 68
5619.54
5698.39
5776.19
5854.96
5934.29
6013.27
6091.10
6170.35
6248.68
6326.86
6404.35
356.75
356.83
356.91
357.00
357.10
357.24
357.43
357.69
357.98
358.33
358.72
359.09
359.46
359.82
0.17
0.52
0.86
1. 21
1. 55
1. 88
2.19
2.48
2.77
3.05
3.31
3.56
3.81
4.05
4.30
4.53
DLS
(deg/
100f)
1.12
1. 05
1. 00
0.45
2.16
2.78
4.64
2.31
2.97
6.20
0.95
0.39
0.46
0.38
1. 76
0.78
1. 32
0.50
1. 38
1. 51
1. 01
1. 45
1.16
0.73
0.46
0.44
0.40
0.80
1.13
1.45
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
--------
--------
Seq Measured
# depth
(ft)
--------
--------
91
92
93
94
8594.42
8686.86
8771.73
8845.00
------
------
Incl
angle
(deg)
------
------
60.35
59.73
59.04
59.04
-------
-------
Azimuth
angle
(deg)
-------
-------
22.47
22.61
22.42
22.42
[(c)2005 IDEAL ID9_1C_Ol.4J
------
------
Course
length
(ft)
------
------
92.96
92.44
84.87
73.27
14-Apr-2005 11:02:23
--------
--------
TVD
depth
(ft)
--------
--------
4630.77
4676.93
4720.16
4757.85
--------
--------
Vertical
section
(ft)
--------
--------
6387.77
6458.79
6523.56
6579.34
----------------
----------------
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
----------------
----------------
6459.16
6533.13
6600.61
6658.69
537.10
567.80
595.77
619.73
Page
5 of 5
---------------
---------------
Total
displ
(ft)
At
Azim
(deg)
---------------
---------------
6481.46
6557.76
6627.44
6687.47
4.75
4.97
5.16
5.32
-----
DLS
(deg/
100f)
-----
0.48
0.68
0.84
0.00
-----
------
------
Srvy Tool
tool Corr
type (deg)
------
-----
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
Projected to TD
.
.
~ '.
SCHLUMBERGER
Survey report
Client... .... .......... ..: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . . .: Orion
Well. . . . . . . . . . . . . . . . . . . . .: L-212PB1
API number...............: 50-029-23252-70
Engineer.. ...............: S. Moy
COUNTY: . . . . . . . . . . . . . . . . . .: Nabors 9ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS...........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..... .....: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent. .... ..: 52.00 ft
KB above permanent.... ...: N/A Top Drive ft
DF above permanent.......: 77.80 ft
----- Vertical section origin----------------
Latitude (+N/S-) ...... ...: 0.00 ft
Departure (+E/W-). .......: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).. .......: -999.25 ft
Departure (+E/W-).. ......: -999.25 ft
Azimuth from Vsect Origin to target:
77.80 degrees
~
D
'í
\
C7
\r'
o
[(c)2005 IDEAL ID9_1C_01.4]
.
25-Mar-2005 18:04:07
Spud date. . . . . . . . ........:
Last survey date. ........:
Total accepted surveys...:
MD of first survey... ....:
MD of last survey........:
Page
1 of 2
24-Mar-05
25-Mar-05
8
0.00 ft
824.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model.. .........: BGGM version 2004
Magnetic date... .........: 23-Mar-2005
Magnetic field strength..: 1152.14 HCNT
Magnetic dec (+E/W-) .....: 24.54 degrees
Magnetic dip....... ......: 80.81 degrees
----- MWD survey Reference
Reference G... ...........:
Reference H.......... ....:
Reference Dip.......... ..:
Tolerance of G...........:
Tolerance of H...... .....:
Tolerance of Dip..... ....:
Criteria ---------
1002.68 mGal
1152.14 HCNT
80.81 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
.
----- Corrections ---------------------------
Magnetic dec (+E/W-) .....: 24.54 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-) ....: 24.54 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
SCHLUMBERGER Survey Report 25-Mar-2005 18:04:07 Page 2 of 2
--- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ----- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
-------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ----- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 299.00 0.41 37.21 299.00 299.00 0.81 0.85 0.65 1. 07 37.21 0.14 MWD_ IFR_MS
3 392.31 2.02 332.10 93.31 392.29 0.62 2.57 0.08 2.57 1. 77 2.02 MWD - IFR_MS
4 485.07 4.39 1. 61 92.76 484.90 1. 03 7.57 -0.59 7.59 355.57 3.03 MWD_ IFR_MS
5 577.34 7.77 41. 49 92.27 576.67 6.90 15.77 3.65 16.19 13.02 5.66 MWD_ IFR_MS
6 674.38 10.66 57.18 97.04 672.47 20.59 25.56 15.54 29.91 31. 30 3.92 MWD_ IFR_MS
7 764.43 10.34 68.07 90.05 761.02 36.35 33.09 30.04 44.69 42.23 2.23 MWD_ IFR_MS .
8 824.00 10.34 68.07 59.57 819.62 46.89 37.08 39.96 54.51 47.14 0.00 Projected to TD
[(c)2005 IDEAL ID9_1C_01.4J
.
SCHLUMBERGER
Survey report
Client... ..... ...... .....: BP Exploration (Alaska) Inc.
Field. . . . . . . . . . . . . . . . . . . .: Orion
Well. . . . . . . . . . . . . . . . . . . . .: L-212PB2
API number........ .......: 50-029-23252-71
Engineer. . . . . . . . . . . . . . . . .: St. Amour
Rig: . . . . . . . . . . . . . . . . . . . . .: Nabors 9ES
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS..... ......: Mason & Taylor
----- Depth reference -----------------------
Permanent datum... .......: Mean Sea Level
Depth reference... .......: Driller's Pipe Tally
GL above permanent.......: 52.00 ft
KB above permanent.......: N/A Top Drive ft
DF above permanent.......: 77.80 ft
----- Vertical section origin----------------
Latitude (+N/S-)...... ...: 0.00 ft
Departure (+E/W-). .......: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-) ....... ..: -999.25 ft
Departure (+E/W-) ........: -999.25 ft
Azimuth from Vsect Origin to target: 355.00 degrees
~
c.
-¡
,
ø
w
o
[(c)2005 IDEAL ID9_1C_01.4J
9-Apr-2005 07:05:35
Spud date................:
Last survey date.........:
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
Page
1 of 7
24-Mar-05
06-Apr-05
151
0.00 ft
14338.00 ft
.
----- Geomagnetic data ----------------------
Magnetic model........ ...: BGGM version 2004
Magnetic date............: 23-Mar-2005
Magnetic field strength..: 1152.14 HCNT
Magnetic dec (+E/W-).....: 24.54 degrees
Magnetic dip.............: 80.81 degrees
----- MWD survey Reference
Reference G....... ..... ..:
Reference H. ........... ..:
Reference Dip.... ........:
Tolerance of G.... .......:
Tolerance of H...........:
Tolerance of Dip.........:
Criteria ---------
1002.68 mGal
1152.14 HCNT
80.81 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
.
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 24.54 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 24.54 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ...:
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
SCHLUMBERGER Survey Report
9-Apr-2005 07:05:35
Page
2 of 7
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
0.00
299.00
392.31
485.07
577.34
0.00
0.41
2.02
4.39
7.77
10.66
11.11
13.31
14.74
17.38
20.67
25.38
29.98
35.76
40.81
47.75
49.59
54.48
57.31
58.21
60.36
63.62
66.04
65.23
64.24
65.24
64.32
65.45
64.69
65.80
0.00
37.21
332.10
1. 61
41. 49
57.18
38.65
22.94
8.33
351.16
346.36
346.06
347.37
350.54
352.28
354.69
355.40
354.18
353.97
354.05
354.89
355.24
354.90
354.43
354.54
354.36
354.22
353.55
353.78
353.81
[(c)2005 IDEAL ID9_1C_01.4]
674.38
765.11
860.95
956.01
1050.53
1145.04
1240.42
1336.39
1432.00
1526.04
1619.71
1718.76
1812.17
1906.71
2001.62
2096.34
2190.19
2285.89
2380.61
2475.06
2569.17
2664.41
2759.30
2853.30
2949.72
0.00
299.00
93.31
92.76
92.27
97.04
90.73
95.84
95.06
94.52
94.51
95.38
95.97
95.61
94.04
93.67
99.05
93.41
94.54
94.91
94.72
93.85
95.70
94.72
94.45
94.11
95.24
94.89
94.00
96.42
0.00
299.00
392.29
484.90
576.67
672.47
761. 59
855.28
947.54
1038.41
1127.75
1215.51
1300.47
1380.75
1454.54
1521.57
1586.98
1644.43
1697.43
1748.06
1796.44
1840.51
1881.21
1920.28
1960.59
2000.75
2041.33
2081.61
2121.23
2161.60
0.00
0.79
2.55
7.59
15.40
24.10
34.35
50.78
72.22
98.03
128.61
165.47
209.58
261.15
319.28
384.61
458.99
532.60
610.87
691.13
772.55
855.40
942.00
1028.29
1113.70
1198.80
1284.96
1370.86
1456.07
1543.61
0.00
0.85
2.57
7.57
15.77
25.56
36.93
54.31
76.36
102.23
132.40
168.62
212.00
262.91
320.51
385.44
459.54
532.85
610.70
690.54
771.59
854.13
940.42
1026.33
1111.34
1196.05
1281.79
1367.22
1451. 94
1538.98
0.00
0.65
0.08
-0.59
3.65
15.54
28.06
38.13
44.15
43.72
37.61
28.72
18.51
8.69
0.04
-7.29
-13.71
-20.42
-28.50
-36.88
-44.72
-51. 84
-59.29
-67.31
-75.52
-83.75
-92.32
-101.48
-110.88
-120.35
0.00
1. 07
2.57
7.59
16.19
29.91
46.38
66.36
88.21
111.19
13 7.64
171.04
212.81
263.06
320.51
385.51
459.74
533.24
611.37
691.53
772.89
855.70
942.28
1028.53
1113 . 91
1198.98
1285.11
1370.98
1456.16
1543.68
0.00
37.21
1. 77
355.57
13.02
31. 30
37.22
35.07
30.03
23.15
15.86
9.66
4.99
1. 89
0.01
358.92
358.29
357.81
357.33
356.94
356.68
356.53
356.39
356.25
356.11
355.99
355.88
355.76
355.63
355.53
DLS
(deg/
100f)
0.00
0.14
2.02
3.03
5.66
3.92
3.87
4.14
4.00
5.72
3.85
4.94
4.83
6.31
5.49
7.62
1. 93
5.34
3.00
0.95
2.39
3.49
2.55
0.97
1. 05
1. 08
0.98
1. 35
0.84
1.15
------
------
Srvy Tool
tool Corr
type (de g)
------
------
TIP None
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
9-Apr-2005 07:05:35
Page
3 of 7
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
31
32
33
34
35
3045.89
3141.51
3238.62
3334.04
3428.32
36
37
38
39
40
3521.47
3613.35
3708.01
3802.85
3895.94
41
42
43
44
45
3984.97
4075.00
4155.13
4249.58
4340.42
46
47
48
49
50
4438.06
4533.05
4628.69
4723.58
4820.17
51
52
53
54
55
4915.75
5009.84
5104.42
5198.23
5293.12
56
57
58
59
60
5387.41
5481.46
5576.19
5670.68
5763.87
64.60
64.82
65.32
65.52
65.21
64.85
64.23
64.59
63.97
63.55
63.39
63.29
64.03
70.26
75.96
76.15
76.38
76.34
77.67
76.78
77.83
78 .19
77.68
75.83
75.63
75.71
75.58
75.35
76.93
78.54
353.95
353.18
354.12
353.52
353.32
353.11
352.93
354.99
354.38
354.58
353.94
356.14
355.26
354.96
355.79
356.11
355.99
356.38
355.76
355.90
354.80
355.96
355.87
356.14
356.07
353.90
352.60
351.49
348.88
349.23
[(c)2005 IDEAL ID9_1C_Ol.4]
96.17
95.62
97.11
95.42
94.28
93.15
91. 88
94.66
94.84
93.09
89.03
90.03
80.13
94.45
90.84
97.64
94.99
95.64
94.89
96.59
95.58
94.09
94.58
93.81
94.89
94.29
94.05
94.73
94.49
93.19
2201. 94
2242.79
2283.72
2323.42
2362.72
2402.04
2441. 53
2482.42
2523.58
2564.74
2604.51
2644.91
2680.46
2717.13
2743.51
2767.04
2789.59
2812.15
2833.48
2854.84
2875.85
2895.39
2915.16
2936.66
2960.05
2983.39
3006.70
3030.48
3053.12
3072.91
1630.90
1717.32
1805.36
1892.11
1977.78
2062.18
2145.09
2230.44
2315.88
2399.38
2479.03
2559.48
2631.28
2718.27
2805.16
2899.90
2992.16
3085.09
3177.53
3271.71
3364.95
3456.99
3549.47
3640.76
3732.71
3824.06
3915.13
4006.70
4098.10
4188.67
1625.78
1711. 69
1799.21
1885.48
1970.62
2054.47
2136.81
2221.70
2306.78
2389.89
2469.14
2549.29
2620.90
2707.57
2794.18
2888.70
2980.76
3073.49
3165.73
3259.68
3352.62
3444.35
3536.61
3627.70
3719.45
3810.45
3900.93
3991.74
4082.12
4171.53
-129.65
-139.34
-149.08
-158.42
-168.24
-178.22
-188.30
-197.28
-205.20
-213.23
-221.19
-228.15
-233.54
-240.96
-247.95
-254.65
-261.00
-267.19
-273.52
-280.37
-287.93
-295.35
-301.94
-308.30
-314.55
-322.53
-333.24
-345.93
-361.57
-378.86
1630.94
1717.36
1805.38
1892.12
1977.78
2062.18
2145.09
2230.44
2315.89
2399.38
2479.03
2559.48
2631.28
2718.28
2805.16
2899.91
2992.16
3085.09
3177.53
3271.72
3364.96
3456.99
3549.47
3640.77
3732.72
3824.07
3915.13
4006.70
4098.11
4188.70
355.44
355.35
355.26
355.20
355.12
355.04
354.96
354.93
354.92
354.90
354.88
354.89
354.91
354.91
354.93
354.96
355.00
355.03
355.06
355.08
355.09
355.10
355.12
355.14
355.17
355.16
355.12
355.05
354.94
354.81
DLS
(degl
100f)
1.25
0.76
1. 02
0.61
0.38
0.44
0.70
2.00
0.87
0.49
0.67
2.19
1. 35
6.60
6.34
0.37
0.27
0.40
1. 54
0.93
1. 57
1.27
0.55
1. 99
0.22
2.23
1. 35
1.16
3.16
1. 77
------
------
Srvy Tool
tool Corr
type (de g)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
9-Apr-2005 07:05:35
Page
4 of 7
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
DLS
(deg/
100f)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
61
62
63
64
65
5858.80
5953.35
6047.68
6142.06
6237.75
66
67
68
69
70
6332.48
6427.82
6523.28
6618.74
6714.42
71
72
73
74
75
6810.24
6905.05
7000.75
7093.86
7187.47
76
77
78
79
80
7281.46
7375.65
7467.81
7560.40
7654.73
81
82
83
84
85
7749.56
7844.71
7938.57
8033.06
8127.59
86
87
88
89
90
8220.79
8314.56
8410.54
8517.32
8610.76
77.80
76.83
78.53
77.46
75.88
77.45
78.07
78 .27
78.67
78.24
78.12
77.40
77.95
78.76
79.26
78.50
78.15
77.95
77.83
77.90
77.51
77.57
80.54
82.50
80.07
80.60
76.33
76.50
77.19
77.95
349.97
350.22
349.79
349.85
349.24
348.96
349.58
349.82
350.54
350.18
349.51
350.49
350.64
350.66
350.71
349.84
350.49
350.15
350.38
350.57
350.11
349.86
350.69
351. 48
350.56
350.99
348.84
349.24
349.04
348.77
[(c)2005 IDEAL ID9_1C_01.4J
94.93
94.55
94.33
94.38
95.69
94.73
95.34
95.46
95.46
95.68
95.82
94.81
95.70
93.11
93.61
93.99
94.19
92.16
92.59
94.33
94.83
95.15
93.86
94.49
94.53
93.20
93.77
95.98
106.78
93.44
3092.38
3113.14
3133.26
3152.90
3174.96
3196.81
3217.02
3236.59
3255.67
3274.82
3294.45
3314.55
3334.97
3353.77
3371.61
3389.74
3408.80
3427.88
3447.31
3467.14
3487.33
3507.86
3525.68
3539.61
3553.94
3569.58
3588.33
3610.88
3635.18
3655.29
4281.17
4373.08
4464.88
4556.82
4649.51
4741.19
4833.90
4926.93
5020.13
5113.57
5206.98
5299.28
5392.49
5483.42
5575.05
5666.96
5758.88
5848.74
5938.96
6030.89
6123.24
6215.79
6307.62
6400.86
6494.06
6585.69
6677.18
6769.97
6873.40
6964.14
4262.91
4353.78
4444.54
4535.40
4626.96
4717.47
4809.01
4900.94
4993.10
5085.52
5177.84
5269.08
5361.31
5451.30
5541.98
5632.88
5723.76
5812.64
5901.86
5992.82
6084.16
6175.65
6266.47
6358.79
6451.08
6541.76
6632.20
6723.79
6825.90
6915.45
-395.63
-411.50
-427.50
-443.81
-460.71
-478 .14
-495.48
-512.19
-528.14
-543.84
-560.38
-576.47
-591.79
-606.61
-621. 48
-637.06
-652.81
-667.98
-683.28
-698.54
-714.09
-730.25
-745.81
-760.29
-774.87
-789.60
-805.67
-823.41
-843.00
-860.56
4281. 23
4373.18
4465.05
4557.06
4649.84
4741.64
4834.47
4927.63
5020.96
5114.52
5208.08
5300.53
5393.88
5484.94
5576.71
5668.79
5760.87
5850.89
5941. 29
6033.39
6125.92
6218.67
6310.69
6404.08
6497.45
6589.25
6680.95
6774.02
6877.76
6968.79
354.70
354.60
354.51
354.41
354.31
354.21
354.12
354.03
353.96
353.90
353.82
353.76
353.70
353.65
353.60
353.55
353.49
353.44
353.40
353.35
353.31
353.26
353.21
353.18
353.15
353.12
353.07
353.02
352.96
352.91
1. 09
1. 06
1. 86
1.14
1. 76
1. 68
0.91
0.32
0.85
0.58
0.70
1.26
0.59
0.87
0.54
1. 22
0.77
0.42
0.28
0.21
0.63
0.26
3.28
2.23
2.74
0.73
5.08
0.44
0.67
0.86
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
9-Apr-2005 07:05:35
Page
5 of 7
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
Seq Measured
# depth
(ft)
Incl
angle
(de g)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
DLS
(deg/
100f)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- --------------- -----
91
92
93
94
95
8703.78
8798.71
8893.67
8988.33
9083.23
96
97
98
99
100
9178.00
9274.00
9367.83
9461.80
9555.81
101 9650.49
102 9743.78
103 9838.04
104 9932.04
105 10023.90
106 10119.24
107 10213.66
108 10308.96
109 10402.07
110 10497.65
111 10593.03
112 10688.40
113 10782.92
114 10878.44
115 10974.11
116
117
118
119
120
11068.60
11163.04
11257.62
11352.75
11446.73
77.61
76.91
76.66
76.74
76.52
76.95
77.31
76.74
76.54
76.67
77.31
77.44
78.01
78.97
79.23
79.44
79.59
79.60
79.80
79.09
77.13
72.91
71.41
69.52
66.57
63.63
59.89
55.57
50.79
47.27
349.59
349.83
349.73
350.08
350.30
349.46
349.20
348.90
348.81
348.46
349.19
349.39
349.90
350.72
350.69
351. 31
350.98
351. 44
351.46
352.08
351.39
348.24
347.98
347.38
346.50
344.91
344.29
343.19
340.61
338.07
[(c)2005 IDEAL ID9_1C_Ol.4]
93.02
94.93
94.96
94.66
94.90
94.77
96.00
93.83
93.97
94.01
94.68
93.29
94.26
94.00
91. 86
95.34
94.42
95.30
93.11
95.58
95.38
95.37
94.52
95.52
95.67
94.49
94.44
94.58
95.13
93.98
3674.98
3695.91
3717.62
3739.40
3761.34
3783.09
3804.47
3825.54
3847.25
3869.03
3890.35
3910.74
3930.78
3949.53
3966.90
3984.55
4001.73
4018.94
4035.59
4053.10
4072.75
4097.40
4126.36
4158.30
4194.06
4233.84
4278.52
4329.01
4386.01
4447.63
7054.58
7146.78
7238.84
7330.59
7422.60
7514.47
7607.60
7698.54
7789.44
7880.33
7972.04
8062.63
8154.33
8246.13
8336.08
8429.54
8522.17
8615.70
8707.14
8800.95
8894.13
8985.85
9075.17
9164.45
9252.30
9336.87
9418.69
9497 .10
9571.25
9639.57
7004.74
7095.85
7186.82
7277.52
7368.50
7459.30
7551.27
7641. 04
7730.74
7820.40
-877.63
-894.17
-910.57
-926.71
-942.45
-958.65
-975.98
-993.35
-1011.02
-1029.04
7910.90 -1046.92
8000.35 -1063.84
8090.95 -1080.39
8181.75 -1095.90
8270.77 -1110.46
8363.31 -1125.12
8455.04 -1139.41
8547.67 -1153.74
8638.27 -1167.36
8731.26 -1180.81
8823.62 -1194.22
8914.27 -1210.48
9002.31 -1229.02
9090.25 -1248.22
9176.68 -1268.26
9259.73 -1289.41
9339.92 -1311.49
9416.68 -1333.86
9489.05 -1357.46
9555.44 -1382.45
7059.51
7151.96
7244.28
7336.29
7428.52
7520.65
7614.08
7705.34
7796.57
7887.81
7979.88
8070.77
8162.77
8254.82
8344.98
8438.65
8531.47
8625.19
8716.79
8810.74
8904.07
8996.08
9085.82
9175.55
9263.91
9349.07
9431.55
9510.68
9585.66
9654.93
352.86
352.82
352.78
352.74
352.71
352.68
352.64
352.59
352.55
352.50
352.46
352.43
352.39
352.37
352.35
352.34
352.33
352.31
352.30
352.30
352.29
352.27
352.23
352.18
352.13
352.07
352.01
351.94
351.86
351.77
0.94
0.78
0.28
0.37
0.32
0.97
0.46
0.68
0.23
0.39
1. 01
0.25
0.80
1. 33
0.28
0.68
0.38
0.47
0.22
0.98
2.17
5.45
1. 61
2.07
3.20
3.47
4.00
4.67
5.47
4.26
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
9-Apr-2005 07:05:35
Page
6 of 7
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
Seq Measured
# depth
(ft)
Incl
angle
(deg)
Azimuth
angle
(deg)
Course
length
(ft)
TVD
depth
(ft)
Vertical
section
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ------ ------- ------ -------- -------- ---------------- ---------------
-------- ------ ------- ------ -------- -------- ---------------- ---------------
121 11540.40
122 11635.21
123 11729.99
124 11823.14
125 11918.56
126
127
128
129
130
12012.78
12107.70
12201.50
12296.86
12390.99
131 12484.82
132 12580.27
133 12676.31
134 12772.58
135 12869.50
136 12965.39
137 13060.65
138 13154.21
139 13247.85
140 13344.32
141
142
143
144
145
13437.29
13530.07
13620.49
13714.10
13808.61
146
147
148
149
150
13903.67
13997.01
14091.89
14186.40
14281. 82
43.29
39.06
36.09
32.96
30.68
30.14
29.57
29.02
28.51
29.27
29.73
30.06
30.44
30.99
30.65
29.29
29.12
29.82
30.62
31. 00
30.84
29.53
28.75
28.21
28.53
30.08
29.91
29.97
29.34
27.72
332.73
331.78
331.45
333.14
333.19
333.09
331.68
331.69
331.30
331.60
334.03
335.51
335.80
337.74
336.25
333.60
334.72
333.50
333.11
332.69
332.45
334.34
335.45
336.96
338.69
338.33
337.62
336.59
336.59
336.24
[(c)2005 IDEAL ID9_1C_01.4]
93.67
94.81
94.78
93.15
95.42
94.22
94.92
93.80
95.36
94.13
93.83
95.45
96.04
96.27
96.92
95.89
95.26
93.56
93.64
96.47
92.97
92.78
90.42
93.61
94.51
95.06
93.34
94.88
94.51
95.42
4513.55
4584.89
4660.00
4736.74
4817.81
4899.07
4981.40
5063.20
5146.79
5229.21
5310.88
5393.63
5476.59
5559.36
5642.59
5725.66
5808.81
5890.27
5971.18
6054.04
6133.79
6213.99
6292.97
6375.25
6458.41
6541.30
6622.14
6704.36
6786.49
6870.32
Displ
+N/S-
(ft)
9702.25
9759.81
9812.85
9861.53
9908.23
9615.95 -1410.03
9671.19 -1439.06
9722.03 -1466.53
9768.75 -1491.10
9813.64 -1513.81
9952.50
9996.11
10038.26
10080.34
10122.03
9856.19
9898.05
9938.46
9978.79
10018.73
-1535.36
-1557.25
-1579.02
-1600.92
-1622.65
9718.78
9777.67
9832.02
9881.89
9929.71
9975.06
10019.81
10063.12
10106.39
10149.29
10164.81 10059.83 -1643.75 10193.24
10209.45 10102.86 -1664.03 10238.99
10255.10 10146.94 -1683.97 10285.73
10301.80 10192.13 -1703.36 10333.48
10349.02 10237.83 -1722.76 10381.77
10394.01 10281.22 -1743.03 10427.92
10437.45 10323.05 -1763.29 10472.56
10480.45 10364.45 -1783.40 10516.76
10524.24 10406.56 -1804.57 10561.86
10570.02 10450.54 -1827.08 10609.06
10614.17 10492.94 -1849.09 10654.62
10657.53 10534.64 -1869.99 10699.32
10698.88 10574.51 -1888.67 10741.85
10741.13 10615.34 -1906.69 10785.22
10784.03 10656.93 -1923.63 10829.15
10828.64 10700.22 -1940.68 10874.78
10873.26 10743.48 -1958.18 10920.47
10918.32 10787.10 -1976.60 10966.70
10962.69 10830.01 -1995.18 11012.26
11005.89 10871.78 -2013.41 11056.64
351.66
351. 54
351. 42
351.32
351.23
351.15
351. 06
350.97
350.89
350.80
350.72
350.65
350.58
350.51
350.45
350.38
350.31
350.24
350.16
350.08
350.01
349.93
349.87
349.82
349.77
349.72
349.67
349.62
349.56
349.51
DLS
(deg/
100f)
5.87
4.51
3.14
3.51
2.39
0.58
0.95
0.59
0.57
0.82
1. 37
0.85
0.42
1.18
0.86
1. 98
0.60
0.99
0.88
0.45
0.22
1. 74
1. 05
0.96
0.93
1. 64
0.42
0.55
0.67
1.71
------
------
Srvy Tool
tool Corr
type (deg)
------
------
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
.
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
MWD_IFR_MS
SCHLUMBERGER Survey Report
9-Apr-2005 07:05:35
--- -------- ------ ------- ------ --------
-------- ------ ------- ------ --------
Seq Measured Incl Azimuth Course TVD
# depth angle angle length depth
(ft) (deg) (deg) (ft) (ft)
--- -------- ------ ------- ------ --------
-------- ------ ------- ------ --------
151 14338.00 27.72 336.24 56.18 6920.05
[(c)2005 IDEAL ID9_1C_Ol.4J
Page
7 of 7
-------- ---------------- ---------------
-------- ---------------- ---------------
Vertical
section
(ft)
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
Total
displ
(ft)
At
Azim
(deg)
-------- ---------------- ---------------
-------- ---------------- ---------------
11030.63 10895.69 -2023.94 11082.08 349.48
----- ------
------
DLS Srvy Tool
(deg/ tool Corr
100f) type (deg)
------
------
0.00 Projected to TD
.
.
.
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman (AOGCC)
Well No L-212 Date Dispatched: 23-May-05
Installation/Rig Nabors 9ES Dispatched By: Mauricio Perdomo
Data No Of Prints No of Floppies
Surveys 2 1
11 I
vþ I. 0 (JiW Please sign and return to: James H. Johnson
Received By: BP Exploration (Alaska) Inc.
Petrotechnical Data Center (LR2-1)
900 E. Benson Blvd.
Anchorage, Alaska 99508
Fax: 907-564-4005
e-mail address: johnsojh@bpocom
LWD Log Delivery V 1.1 , 10-02-03
Schlumberger Private
Fd-L
;t () ~- -Q 3 ò
.
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman (AOGCC)
Well No L-212PB1 Date Dispatched: 23-May-05
Installation/Rig Nabors 9ES Dispatched By: Mauricio Perdomo
Data No Of Prints No of Floppies
Surveys 2 1
A t .
J'¿L r roo u Please sign and return to: James H. Johnson
Received By: I v · ~ -- --..... BP Exploration (Alaska) Inc.
, Petrotechnical Data Center (LR2-1)
900 E. Benson Blvd.
Anchorage, Alaska 99508
Fax: 907 -564-4005
e-mail address: johnsojh@bp.com
LWD Log DehveryV1.1, 10-02-03
Schlumberger Private
f:(,- À6r- ~3u
.
.
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman
Well No L-212PB2 Date Dispatched: 23-May-05
Installation/Rig Nabors 9ES Dispatched By: Mauricio Perdomo
Data No Of Prints No of Floppies
Surveys 2 1
I
Received By: t1/øu. _ J 01 r¡, , Please sign and return to:
f" Drilling & Measurements LWD Division
2525 Gambell Street, Suite 400
Anchorage. Alaska 99501
nrose1@slb.com
Fax: 907-561-8417
LWD Log Delivery V 1.1 , 10-02-03
Schlumberger Private
F':/{.. A ~ r-lßa
_ STATE OF ALASKA ..
ALASKJlrIL AND GAS CONSERVATION CO~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
RECEIVËÖ
MAY 1 7 2005
0"1 & Gee
fiUaS¡Œ { I. liS oos. ommlsslGn
1a. Well Status: 0 Oil o Gas o Plugged o Abandoned o Suspended o WAG 1 b. Well Class: Anchorage
20AAC 25.105 20AAC 25.110 o Development 0 Exploratory
DGINJ 181 WINJ o WDSPL No. of Completions One Other o Stratigraphic 181 Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 4/19/2005 205-030
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 3/24/2005 50- 029-23252-00-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 4/13/2005 PBU L·212i
2575' NSL, 3676' WEL, SEC. 34, T12N, R11E, UM 8. KB Elevation (ft): 15. Field I Pool(s):
Top of Productive Horizon:
3310' NSL, 3313' WEL, SEC. 27, T12N, R11E, UM 77.80' Prudhoe Bay Field I Orion
Schrader Bluff
Total Depth: 9. Plug Back Depth (MD+ TVD)
3953' NSL, 3044' WEL. SEC. 27, T12N, R11 E, UM 8748 + 4708 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 583238 y- 5978297 Zone- ASP4 8845 + 4758 Ft ADL 028239
------ ------- 11. Depth where SSSV set 17. Land Use Permit:
TPI: x- 583522 y- 5984315 Zone- ASP4
Total Depth: x- 583783 y- 5984962 Zone- ASP4 (Nipple) 3792' MD
- _~__~__n__ .--------- -- n __ ___ _n____n______ _ 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey 181 Yes DNo NI A MSL 1900' (Approx.)
21. Logs Run:
MWD I GR, MWD I GR 1 RES I DEN I NEU I Sonic I PWD, MWD I GR I RES I DEN I NEU I PWD, US IT
22. CASING, LINER AND CEMENTING RECORD
CASING ~ETTING DEPTH MD ~ETTING UEPTHT\i[) HOLE AMOUNT
SIZE WT. PER FT. GRADE TOP ¡BoTTOM TOP BoTTOM SIZE CEMENTING RECORD PULLED
20" x 34" 215.5# A53 Surface 108' Surface 108' 42" 60 sx Arctic Set (Approx.)
9-5/8" 40# L-80 30' 4055' 30' 2636' 12-1/4" 06 sx Arcticset Lite, 384 sx 'G'
7" 26# L-80 26' 8832' 26' 4751' 8-3/4" 32 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Gun Diameter, 5spf 4-1/2", 12.6#, L-80 7945'
MD TVD MD TVD 3-1/2",9.3#, L-80 7945' - 8448' 7885', 8143', 8350'
8050' - 8116' 4375' - 4405' 25. ACID, FRACTURE,CEMENT SaüËEZE, ETC.
8156' - 8182' 4423' - 4435'
8394' - 8516' 4533' - 4544' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
3000' Freeze Protect with 103 Bbls of Diesel
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Injection Yet
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED ... OIL-BBL GAs-McF WATER-BBL OIL GRAVITy-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
r CÓ~¡;rtl':1~~õtf"l RBDMS 8Fl MAY 1 9 2005
None 9)¡~ i OR\G\\\lAL
l!:.8J ~J Gr-
,';' . ,:
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
f8.
GEOLOGIC MARKER
29.
ORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Ugnu 4512'
Ugnu MA 6967'
Ugnu MB1 7072'
Ugnu MB2 7231'
Ugnu MC 7427'
Schrader Bluff NA 7539'
Schrader Bluff NB 7596'
Schrader Bluff NC 7706'
Schrader Bluff OA 7914'
Schrader Bluff OBa 8049'
Schrader Bluff OBb 8154'
Schrader Bluff OBc 8273'
Schrader Bluff OBd 8393'
Schrader Bluff OBe 8544'
Schrader Bluff OBf 8625'
Base Schrader Bluff I Top Colville 8716'
2845'
3910'
3951'
4018'
4103'
None
4150'
4174'
4221'
4313'
4374'
4422'
4476'
4533'
4606'
4646'
4692'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~ . Title Technical Assistant
Date OS/Ilð /0.
PBU L-212ì
Well Number
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Michael Triolo, 564-5774
205-030
Permit No. I A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
Submit Original Only
4.65 (ppg)
Printed: 4/25/2005 10:24:04 AM
Surface Pressure
775 (psi
9.00 (ppg)
Legal Name L-212
Common Name:
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
3/22/2005 09:00 - 12:00 3.00 MOB P PRE RDMU. Disconnect the blocks from the top drive and bridle up.
Latch up truck to the pits and pull away from the sub. Move
sub off of V-120 to the center of the pad.
12:00 - 18:00 6.00 MOB N WAIT PRE Rig on standby with full crews from 1200 hours waiting on
heavy equipment to clear the road and for the winds to die
down to lay the derrick over.
18:00 - 19:30 1.50 MOB P PRE Move the satellite camp from V pad to L pad. Spot same.
19:30 - 00:00 4.50 MOB N WAIT PRE Rig on standby with full crews waiting on heavy equipment to
clear the road and for the winds to die down to lay the derrick
over.
3/23/2005 00:00 - 01 :30 1.50 MOB N WAIT PRE Rig on standby with full crews waiting on heavy equipment to
clear the road. With winds - 25 mph. the derrick was layed
over.
01 :30 - 07:00 5.50 MOB P PRE Road from V-pad to L-pad clear - move sub to L-pad. Move pit
complex from V-pad to L-pad.
07:00 - 09:00 2.00 RIGU P PRE NU diverter spool. Remove snow from diverter line. MU
diverter line and ready the cellar area.
09:00 - 13:00 4.00 RIGU P PRE Lay rig mats and herculite. Center and shim the rig into'
position over the well.
13:00 - 14:00 1.00 RIGU P PRE Spot the pit complex into position. Hook up all lines.
Rig Accepted @ 1400 hours 3/23/2005.
14:00 - 16:00 2.00 RIGU P PRE PJSM. Inspect and raise the derrick. Raise the chute, bridle
down and hang the bridle lines in the derrick. RU the top drive
and the rig floor.
16:00 - 00:00 8.00 RIGU P PRE Nipple up the diverter line. Change out the drip pan extension.
Nipple up the surface stack riser. Change out the saver sub to
4.5" IF. Load the pipe shed with 5" DP and strap pipe.
3/24/2005 00:00 - 03:00 3.00 RIGU P PRE Load the pipe shed with 5" DP and strap pipe.
03:00 - 08:00 5.00 DRILL P SURF PU 5" DP and stand back in the derrick.
08:00 - 10:00 2.00 DRILL P SURF PU 14 joints of 5" HWDP.
10:00 - 13:00 3.00 DRILL P SURF Bring remaining BHA tools to the rig floor. Strap tools. Clean
up the rig floor and the pipe shed.
13:00 - 13:30 0.50 DRILL P SURF RIH with a stand of 5" drill collars and function test the diverter
- good. Witness of the function test was waived by Chuck
Shieve of the AOGCC.
13:30 - 14:00 0.50 DRILL P SURF Hold Pre-spud with the entire rig team.
14:00 - 16:00 2.00 DRILL P SURF RIH with BHA#1. Orient MWD and motor.
BHA#1: 12-1/4" Hughes MXC-1, 9-5/8" PDM (1.5 degree
bend), NM lead collar, NM string stab. MWD, NM string stab,
NM xo. 3 x NM DC's, saver sub, 1 x 5" HWDP, jars, 13 x
HWDP.
16:00 - 16:30 0.50 DRILL P SURF Circulate mud system and conductor to check for leaks - good.
16:30 - 00:00 7.50 DRILL P SURF Spud well @ 1630 hours. Drill directionally from 108' to 660'.
PU - 76, SO - 70, ROT - 73, 565 gpm, 1.050 psi. ART - 1.92,
AST - 2.57.
3/25/2005 00:00 - 02:00 2.00 DRILL P SURF Drill directionally from 660' to 824'. Very difficult to achieve
azimuthal direction. Attempted to slide pointed 90 LHS (270
degrees). but the azimuth climbed to 65 RHS (65 degrees).
Talked to town and made another attempt to correct over a 30
slide without success. Spoke to town and agreed to pull
BHA#1 to take a look. AST - 1.5 hours
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
3/25/2005 02:00 - 02:30 0.50 DRILL N DFAL SURF Circulate bottoms up for trip out of the hole.
02:30 - 05:30 3.00 DRILL N DFAL SURF POH from 824' standing back the BHA in the derrick. Found
the motor had come unscrewed at the adjusting ring. Change
out the motor and the MWD. Adjust the motor to a 1.83 bend.
Upon further investigation it was determined that the motor was
brought out to the rig without being torqued up properly.
05:30 - 08:00 2.50 DRILL N DFAL SURF RIH with 12.25" BHA #2. Take check shot surveys every 90'.
Hit obstruction @ 678'. Decide to OH sidetrack the well from
this point to help improve well bore position and decrease
subsequent corrections needed to get back on the line.
BHA#2: 12-1/4" Hughes MXC-1 RR, 9-5/8" PDM (1.83 degree
bend), NM lead collar, NM string stab, MWD, NM string stab,
NM xo, 3 x NM DC's, saver sub, 1 x 5" HWDP, jars, 13 x
HWDP.
08:00 - 10:30 2.50 DRILL N IDFAL SURF OH sidetrack the well from 678' to 824' @ 570 gpm, 950 psi.
10:30 - 21 :00 10.50 DRILL P SURF Drill directionally from 824' to 1,678' @ 652 gpm, 1,450 psi.
I I PU - 90K, SO - 75K, ROT - 85K. AST - 9.25, ART - 0.9.
21 :00 - 21 :45 0.75 DRILL P SURF Circulate and condition the mud prior to POH for new bit - 652
gpm, 1,330 psi.
21 :45 - 23:00 1.25 DRILL P SURF POH with 5" from 1,678' to top of the BHA @ 636'.
23:00 - 00:00 1.00 DRILL P SURF Stand back BHA#2 components.
3/26/2005 00:00 - 00:30 0.50 DRILL P SURF Contiune to stand back BHA#3 components.
00:30 - 01 :00 0.50 DRILL P SURF PU new 12.25" MXC-1 bit and adjust the motor to 1.5 degree
bend. RIH.
01 :00 - 01 :30 0.50 DRILL P SURF Service the top drive and the crown.
01 :30 - 03:00 1.50 DRILL P SURF PU remaining BHA#3 to 641'.
BHA#3: 12-1/4" Hughes MXC-1, 9-5/8" PDM (1.5 degree
bend), NM lead collar, NM string stab, MWD, NM string stab,
NM xo, 2 x NM DC's, NM string stab, 1 x NM DC's,saver sub, 1
x 5" HWDP, jars, 13 x HWDP.
03:00 - 04:00 1.00 DRILL P SURF RIH with BHA#3 on 5" DP. Precautionary wash and ream last
stand to 1,678'.
04:00 - 18:00 14.00 DRILL P SURF Drill directionally from 1,678' to 4,070' - TD. PU - 100K, SO -
75K, ROT - 85K, 700 gpm, 80 rpm. TO on - 8k, TQ off - 4K.
AST - 3.25, ART - 5.67
Note: Encountered hydrates from 2,080' to 2,723'.
18:00 - 19:30 1.50 DRILL P SURF Circulate and condition the mud for short trip - 80 rpm, 700
gpm, 2,000psi.
19:30 - 22:00 2.50 DRILL P SURF POH for short trip (wet) from 4,070' to 1,535'. Had to work pipe
from 1,830' to 1,788'.
22:00 - 00:00 2.00 DRILL P SURF RIH for short trip from 1,535' to 2,538'. Work pipe down from
2,538' to 2,723' - pushing something ahead. Screw in with the
top drive and ream down to 2,754' - 40 rpm, 200 gpm.
Disconnect top drive and RIH from 2,754' to 2,840'.
3/27/2005 00:00 - 01 :00 1.00 DRILL P SURF Continue to RIH for short trip from 2,840' to 3,235'. Screw in
with the top drive and ream down to 3,266' - 40 rpm, 200 gpm.
Disconnect top drive and RIH from 3,266'. Precautionary wash
and ream the last stand to bottom, 4,070'.
01 :00 - 02:30 1.50 DRILL P SURF Circulate and condition the mud for trip out and running casing.
02:30 - 05:00 2.50 DRILL P SURF POH (wet) from 4,070' to the top of BHA#3 @ 641'.
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
3/27/2005 05:00 - 09:00 4.00 DRILL I~ SURF LD 12-1/4" BHA #3 from 641'.
09:00 - 09:30 0.50 DRILL SURF Clear and clean the floor.
09:30 - 12:00 2.50 CASE P SURF RU 350 ton casing equipment. Change out the bails. MU
ISURF Franks fillup tool and 350 ton elevators. Make a dummy run
with the casing hanger.
12:00 - 19:00 7.00 CASE P RIH with 97 joints of 9-5/8", 40#, L-BO, BTC casing torqued to
8,500 ft-Ibs. Bakerloc'd float equipment. Utilized Best-o-life
2000 thread lubricant. Had to work pipe across the base of the
2.50 I CASE permafrost.
19:00 - 21 :30 P SURF Circulate and condition the mud. Stage the pumps up to 378
gpm, 610 psi. PU -175K, SO - 80K.
21 :30 - 23:20 1.831 CASE N WAIT SURF Continue to circulate while waiting for last water truck to arrive
on location. Hold PJSM with oncoming crew.
23:20 - 00:00 0.671 CEMT P SURF Prime up the cement pump unit. Line up to Dowell. Pump 5
I bbls water ahead to warm the lines. Shut down and pressure
test lines to 3,500 psi - good test. Bleed off presure back to the
¡ pump unit. Batch up 10.0 ppg spacer.
3/28/2005 100:00 - 03:30 3.50 CEMT P SURF Pump 78 bbls of Mudpush II spacer @ 7 bpm, 400 psi initial,
I 345 psi final. Shut down and drop the bottom plug - good
I
indication. Batch up the lead cement to 10.7 ppg. Place red
dye in the first 5 bbls of the lead cement. Pump the lead
cement @ 8 bpm for the first 220 bbls, 460 psi initial, 400 psi
final. Drop rate to 6 bpm to allow vac truck to keep up, for the
next 55 bbls, 340 psi initial, 300 psi final. Drop rate to 4 bpm
and pump the remaining 205 bbls (total 480 bbls lead), 230 psi
initial, 490 psi final. Swap over to 15.8 ppg cement on the fly.
Pumped 81 bbls of 15.8 ppg cement @ 4 bpm, 605 psi initial,
440 psi final. Shut down and drop the top plug - good
indication. Pump 10 bbls of fresh water behind the plug. Shut
down and swap over to the rig pumps. Displace with old 9.5
ppg mud using the rig pumps at 7.5 bpm for the first 92 bbls.
Drop the rate adjusting rate from 6 to 3 bpm for 134 bbls due to
thickened fluid returning to surface. Once the fluid cleaned up,
brought rate back to 8 bpm for 49 bbls. Dropped the rate to 3
bpm to bump the plug with a total of 293 bbls mud displaced.
Bumped the plug with 1500 psi (500 psi over the max pressure
seen while pumping). Good lift was seen throughout the job.
No losses during the cement job. Bleed off pressure and
check floats - holding.
CIP @ 0300 hours 3/28/2005. 160 bbls (-100 bbls good
cement) of cement returns to surface.
03:30 - 07:00 3.50 DIVRTR P SURF ND diverter.
Simop: RD the franks fillup tool and 350 ton casing equipment.
07:00 - 12:00 5.00 BOPSU P SURF NU BOPE.
12:00 - 17:00 5.00 BOPSU P SURF Test BOPE, choke manifold and all associated valves to 250
psi/ 4,000 psi. and Annular Preventer to 250 psi/ 3,500 psi. per
Nabors testing procedure. Witness of the BOP test was
waived by John Crisp of the AOGCC. The BOP test was
witnessed by Alan Madsen for BP and Chris Clemens for
Nabors.
17:00 - 22:45 5.75 DRILL P PROD1 MUBHA#4. RIHt01,121'. Shallow test MWD - good test.
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
3/28/2005 17:00 - 22:45 5.75 DRILL P PROD1
BHA #4: Hughes 8-3/4" MXC-1, 6-3/4" motor w/ 7/8 - 5 stg,
float sub, NM stab, LWD, MWD, NM XO, NM DC, NM stab, 2 x
NM DC, saver sub, 1 x 5" HWDP, jars, 1 x 5" HWDP, XO, 24 x
4" HWDP, 8-3/4" Ghost Reamer, 3 x 4" DP, XO
22:45 - 00:00 1.25 DRILL P PROD1 RIH w/ BHA#4 picking up 5" DP from 1,121' to 1,875'
3/29/2005 00:00 - 03:30 3.50 DRILL P PROD1 RIH wi BHA#4 picking up 5" DP from 1,875' to 3,850'.
03:30 - 04:00 0.50 DRILL P PROD1 Fill pipe and circulate hole.
04:00 - 05:00 1.00 CASE P SURF Line up and pressure test the 9-5/8" 40# L-80 BTC casing to
3,500 psi. Chart and hold for 30 minutes - good test.
05:00 - 05:30 0.50 DRILL P PROD1 Service the top drive.
05:30 - 06:30 1.00 DRILL P PROD1 RIH tag float collar @ 3,968' drill float equipment and cement
to 4,027',5 to 15k wob, 525 gpm, 1665 psi, 50 rpm, torque 9k.
06:30 - 07:30 1.00 DRILL P PROD1 Pick up and circulate out cement contaminated mud.
07:30 - 08:00 0.50 DRILL P PROD1 Continue drilling shoe track and 20' new hole to 4,090'
08:00 - 09:00 1.00 DRILL P PROD1 Displace well to 9.0 ppg LSND mud, 580 gpm 1700 psi, 100
rpm, torque 9k.
09:00 - 10:00 1.00 DRILL P PROD1 Rig up and perform LOT, md. 4055', tvd 2,642' 9.0 ppg,
pressure achieved 775 psi, 14.64 ppg EMW.
10:00 - 10:30 0.50 DRILL P PROD1 Obtain basline ECD with new mud = 9.94 ecd.
10:30 - 16:30 6.00 DRILL N RREP PROD1 Change out topdrive washpipe packing.
16:30 - 00:00 7.50 DRILL P PROD1 Directional drill 8.75" hole from 4,090' to 5,085' 15 - 20k wob,
600 gpm, 1850 psi on bottom, 1710 psi off bottom, 80 - 100
rpm, 10k torque on bottom, 8.5k torque off bottom. Pumped 20
bbl high vis sweeps @ 4,700', 5,085' amount of cuttings
doubled when sweeps came back.
3/30/2005 00:00 - 05:30 5.50 DRILL P PROD1 Directional drill 8.75" hole from 5,085" to 5,908' 15 - 20k wob,
600 gpm, 1940 psi on bottom, 1820 psi off bottom, 80 - 100
rpm, 10k torque on bottom, 8.5k torque off bottom. Change
screens on shakers from 140's to 11 O's to minimize losses over
screens. Currently utilizing 3 super suckers, no more trucks
available. Calculated ECD 10.24, actual 11.08. Pumped 25 bbl
sweep at 5,800' had slight increase in cuttings when sweep
came back, ECD remained at 11.00
05:30 - 06:30 1.00 DRILL P PROD1 Circulate 25 bbl high vis sweep around to reduce ECD, had
slight increase in cuttings when sweep came back. new
calculated ECD 10.84 actual 11.00, YP increased from 26 to
37.
06:30 - 10:00 3.50 DRILL P PROD1 Directional drill from 5,908' to 6,277', 20 - 30k wob, 600 gpm,
2120 psi on bottom, 2000 psi off bottom, 100 rpm, 9.5k torque
on bottom, 8.5k torque off bottom. Dilute with seawater to
reduce YP. YP continued to climb from 37 to 57. calculated
ECD = 11.4 actual = 11.5. AST = 1.81 ART = 3.02
10:00 - 14:00 4.00 DRILL N FLUD PROD1 Circulate and condition mud to lower YP, dilute with fresh
water, Soda Ash and Desco, determined that the seawater that
was being used for dilution had a high calcium content (1750
mg/lt) causing the calcium to react with the clays resulting in
the increase in YP.
14:00 - 21 :00 7.00 DRILL N RREP PROD1 Replace fluid end on #1 mud pump #2 cylinder. Circulate at
reduced rate with #2 pump 3 bpm, continuallly reciprocating
pipe from 6,267 to 6,217'. Test mud pump for leaks, ok.
21 :00 - 00:00 3.00 DRILL P PROD1 Directional drill from 6,277' to 6,598',20 - 30k wob, 600 gpm,
2120 psi on bottom, 2025 psi off bottom, 100 rpm, 1 0.5k torque
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
3/30/2005 21 :00 - 00:00 3.00 DRILL P PROD1 on bottom, 8.5k torque off bottom, up wt = 125k, dn wt = 70k, rt
wt = 90k claculated ECD = 10.24 actual = 10.85 AST = .21
ART = 1.03
3/31/2005 00:00 - 12:00 12.00 DRILL P PROD1 Directional drill from 6,598' to 8,013', 20 - 30k wob, 600 gpm,
2630 psi on bottom, 2430 psi off bottom, 100 rpm, 10k torque
on bottom, 8.3k torque off bottom, up wt = 135k, dn wt = 65k, rt
wt = 93k claculated ECD = 10.98 actual = 11.62, pump
sweeps @ 6,800',7352', had significant increase in cuttings
with both sweeps. AST = .23 ART = 4.82
12:00 - 15:00 3.00 DRILL P PROD1 Directional drill from 8,013' to 8,486', 20 - 30k wob, 600 gpm,
2584 psi on bottom, 2430 psi off bottom, 100 rpm, 10.3k torque
on bottom, 10k torque off bottom, up wt = 140k, dn wt = 65k, rt
wt = 95k claculated ECD = 10.98 actual = 11.62, AST = 1.0
ART = 1.95
15:00 - 18:30 3.50 DRILL P PROD1 Pump 20 bbls sweep, circulate and reciprocate string, 608
gpm, 2,443 psi, 120 rpm, torque 1 0.3k, circulate until shakers
are clean. (6 plus bottoms up) Calculated ECD = 10.48, ECD
prior to trip = 10.81, Monitor well, pump dry job.
18:30 - 19:00 0.50 DRILL P PROD1 POH from 8,486' @ 8,385' started seeing 20-30k excess drag
work string out of the hole to 8,203', hole not taking proper fill.
19:00 - 22:00 3.00 DRILL P PROD1 Made up topdrive and began pumping out from 8,203' pulled
20k over at 8,172' began back reaming, 580 gpm, 2,350 psi,
100 rpm, rotary torque increased to 15k @ 7,631' started
packing off, slowed pumps to 550 gpm and reduce rpm to 80,
this seemed to help, @ 7,160' getting large amounts of coal
over shakers, continue back reaming out to 6,980', Calculated
ECD 10.43, actual 11.55.
22:00 - 00:00 2.00 DRILL P PROD1 Pump 20 bbl high vis sweep, 600 gpm,2250 psi, 100 rpm,
shakers loaded up the quarter and dime sized chunks of coal,
circulated until shakers were clean, calculated ECD 10.43,
actual 10.66
4/1 /2005 00:00 - 07:30 7.50 DRILL P PROD1 Attempt to POH with out rotating, pumped out 2 stands from
6980' to 6,686' no problem, attempt to pull with no pump, pulled
to 6685' 20k over pull, and swabbing, resume pumping out and
back reaming, attempt to pull with no pump with ghost reamer
is inside casing, hole swabbing, continue back reaming out, to
the shoe, 550 gpm, 1750 psi, 80 rpm, torque 7k, still seeing a
steady amount of ground up coal over shakers while back
reaming, no wall cake @ 4,790' rotary torque increased from
7k to 12k, no increase in pump pressure or packing off, work
through area until clean, back ream out to 4,041' . Pulled up to
3,970' with out pump, hole swabbing.
07:30 - 09:30 2.00 DRILL P PROD1 Circulate @ 4,041' until shakers are clean, had significant
amount of coal over shakers, 608 gpm, 1900 psi, 120 rpm.
Monitor well, pump dry job.
09:30 - 13:00 3.50 DRILL P PROD1 POH from 4,041' to BHA, lay down 2 Nm DCs, MWD, bit and
motor. Ghost reamer was in gauge, bit and top string stab
were 1/4" out of gage.
13:00 - 13:30 0.50 DRILL P PROD1 Clean Floor.
13:30 - 15:00 1.50 DRILL P PROD1 Change out topdrive saver sub and test to 4,000 psi.
15:00 - 18:30 3.50 DRILL P PROD1 Make up BHA # 5, Hycalog RSX162, RSS, LWD/CDR, MWD,
Sonic, ADN, NM stab, NM DC, Saver sub, 1 jt 5" HW, Jar, 1 Jt
5" HW, XO, test MWD equipment.
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/1/2005 18:30 - 22:00 3.50 DRILL P PROD1 RIH with BHA #5 pickup 102 joints 4" DP from pipe shed,
shallow test MWD.
22:00 - 00:00 2.00 DRILL P PROD1 Slip and cut drilling line, inspect brakes.
4/2/2005 00:00 - 01 :00 1.00 DRILL P PROD1 POH stand back 34 stands 4" DP
01 :00 - 04:30 3.50 DRILL P PROD1 RIH, 8 stands 4" HW from derrick, pickup remaining 93 joints
4" DP from pipe shed to 3,872'
04:30 - 05:00 0.50 DRILL P PROD1 Service topdrive, FiI DP
05:00 - 06:00 1.00 DRILL P PROD1 RIH from 3872', set down 30k at 4,425', POH set back 1 stand.
06:00 - 08:30 2.50 DRILL P PROD1 Make up 4" Ht X 4 1/2" IF XO, Make up topdrive and ream in
the hole with 5" DP from 4,331' to 4,707', with 300 gpm, 1,100
psi, 75 rpm, 0-10k wob, occasional increased torque and
packing off.
08:30 - 09:00 0.50 DRILL P PROD1 POH wet from 4,707' to 4,425' standing back 5" DP, lay down
crossover. (Notified 5700 prior to POH wet, WSL reported
there would be a total of four 1.64 bbl releases of driling mud to
the rig floor, total mud released 269 gal)
09:00 - 11 :30 2.50 DRILL P PROD1 RIH from 4,425' with 4" DP set down 30k at 6,570', POH set
back 1 stand.
11 :30 - 12:00 0.50 DRILL P PROD1 Make up 4" HT X 4 1/2" IF XO Made up topdrive, Ream in/he·
hole with 5" DP from 6,570 to 6,760' 300 gpm, 1,170 psi, 70
rpm, torque 6.5k to 10.5k. slight packoff with torque spikes.
12:00 - 12:30 0.50 DRILL P PROD1 POH wet from 6,760' to 6,570' stand back 1 stand of 5" DP, lay
down XO. ( WSL notified 5700 @ 12:08 of 1.64 bbl release of
drilling mud to rig floor, discharging 68 gals to the rig floor.)
12:30 - 13:00 0.50 DRILL P PROD1 RIH with 4" DP from 6,570' set down 30k at 7,150', made up
topdrive attempt to ream in the hole, from 7,150' very little
progress, torquing up and packing off.
13:00 - 14:00 1.00 DRILL P PROD1 Circulate and condition hole, working pipe from 7,080' to 7,150'
505 gpm, 2,670 psi, 70 rpm, toque 7k. Mud thick coming back
150+ viscosity, alot of coffee ground sized coal and fine sand
with bottoms up.
14:00 - 15:30 1.50 DRILL P PROD1 RIH from 7,150' to 8,387' working string through tight spots.
Make up topdrive and ream last stand to bottom from 8,387' to
8,487'
15:30 - 17:00 1.50 DRILL P PROD1 Circulate and condition mud prior to driling ahead, Pumping
515 gpm, 2,375 psi, 70 rpm, torque 7- 10k, dump 70 bbls mud
at bottoms up, Viscosity 200+, YP 42, string in 290 bbls fresh
9.0 ppg LSND mud and dilution brine at 30 to 40 bph.
17:00 - 20:00 3.00 DRILL P PROD1 Directional drill 8.75" with RSS from 8,486' to 8,670',25-30
wob, 538 gpm, 3250 psi, 120 rpm, torque 8.5k on bottom, 6-9k
off bottom, ROP = 50 to 100 fph. Pressure rating on 5.5" liners
is 3,575 psi.
20:00 - 22:00 2.00 DRILL P PROD1 Circulate at 300 gpm, 1410 psi 75 rpm, torque 8k, reciprocate
pipe full 90', while changing liners and swabs on both pumps to
5"
22:00 - 00:00 2.00 DRILL P PROD1 Directional drill 8.75" with RSS from 8,670' to 8,857',15-20
wob, 585 gpm, 3450 psi, 120 rpm, torque 9.5k on bottom, 9k
off bottom, up wt = 132k, dn wt = 61k, rt wt = 93k. Pumped high
vis sweep at 8670' amount of cuttings doubled at bottoms up,
90% fine sand. ADT = 2.99
4/3/2005 00:00 - 12:00 12.00 DRILL P PROD1 Directional drill 8.75" with RSS from 8,857' to 10,084',10-20
wOb, 585 gpm, 3590 psi on bottom, 3450 psi off bottom, 115
rpm, torque 9.5 to 12k on bottom, 8k off bottom, up wt = 132k,
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start:
Rig Release:
Rig Number:
3/22/2005
4/19/2005
Spud Date: 3/23/2005
End: 4/19/2005
4/3/2005 00:00 - 12:00 12.00 DRILL P PROD1 dn wt = 68k, rt wt = 93k. Pump sweeps as needed, ADT = 7.87
12:00 - 00:00 12.00 DRILL P PROD1 Directional drill 8.75" with RSS from 10,084' to 11,316', 10-20
wob, 585 gpm, 3330 psi on bottom, 3280 psi off bottom, 130
rpm, torque 12k on bottom, 11 k off bottom, up wt = 156k, dn wt
= 70k, rt wt = 109k. Calculated ECD = 10.38, Actual = 10.60,
ADT = 6.93
4/4/2005 00:00 - 12:00 12.00 DRILL P PROD1 Directional drill 8.75" with RSS from 11,316' to 12,451', 10-20
wOb, 585 gpm, 3430 psi on bottom, 3370 psi off bottom, 130
rpm, torque 13k on bottom, 11 k off bottom, up wt = 189k, dn wt
= 90k, rt wt = 129k. Calculated ECD = 10.29, Actual = 11.01,
ADT = 10.0
12:00 - 00:00 12.00 DRILL P PROD1 Directional drill 8.75" with RSS from 12,451', @ 12,600' began
weighting up mud system to 10.2 ppg with 13.3 ppg spike fluid,
while drilling ahead, 10.2 ppg achieved by 12,731', acquire new
SPR with new mud, Continue drilling ahead from 12,731' to
12,969' 10-25k wob, 580 gpm, 3975 psi on bottom, 3900 psi
off bottom, 130 rpm, torque 14.2k on bottom, 13.5k off bottom,
up wt = 189k, dn wt = 98k, rt wt = 138k, pumped sweep at
12,451' had slight increase in cuttings at bottoms up.
Calculated ECD = 11.34, actual = 11.76, ADT = 8.23
4/5/2005 00:00 - 12:00 12.00 DRILL P PROD1 Directional drill 8.75" with RSS from 12,696' to 13,304', 25-35k
wob, 560 gpm, 3940 psi on bottom, 3905 psi off bottom, 145
rpm, torque 14 to 15.5k on bottom, 14k off bottom, up wt =
212k, dn wt = 103k, rt wt = 138k. Rop slowed to 5 - 20 fph
through hard stringers in the CM1, Calculated ECD = 11.45,
Actual = 11.65, ADT = 11
12:00 - 20:30 8.50 DRILL P PROD1 Directional drill 8.75" with RSS from 13,304', 25-35k wob, 560
gpm, 3940 psi on bottom, 3905 psi off bottom, 145 rpm, torque
14 to 15.5k on bottom, 14k off bottom, up wt = 212k, dn wt =
103k, rt wt = 138k. Reduced flow rate to 520 gpm through the
HRZ from 13,494', at 13,750' driller noticed 400 psi pressure
loss and gain in pump strokes, washed out valve and seat on
#2 pump,
20:30 - 21 :00 0.50 DRILL P PROD1 Rotate and reciprocate pipe, pumping at reduced rate 269 gpm
1845 psi, 100 rpm, torque 14k, Change out valve and seat on
#2 mud pump.
21 :00 - 00:00 3.00 DRILL P PROD1 Resume drilling 8.75" hole from 13,750' to 13,867' 25-35k wob,
525 gpm, 3760 psi on bottom, 3710 psi off bottom, 145 rpm,
torque 14 to 16.5k on bottom, 14k off bottom, up wt = 212k, dn
wt = 103k, rt wt = 144k. Calculated ECD = 11.37, Actual =
11.75, ADT = 7.36
4/6/2005 00:00 - 06:00 6.00 DRILL P PROD1 Directional drill 8.75" hole from 13,867' to 14,245' 25-35k wob,
545 gpm, 3900 psi on bottom, 3860 psi off bottom, 170 rpm,
torque 19 to 21 k on bottom, 19.5k off bottom, up wt = 237k, dn
wt = 108k, rt wt = 152k. ADT = 7.85
06:00 - 14:30 8.50 DRILL P PROD1 Directional drill 8.75" hole from 14,245' to 14,338', 25-35k wob,
545 gpm, 3860 psi on bottom, 3810 psi off bottom, 170 rpm,
torque 20.5k on bottom, 19.5k off bottom, up wt = 237k, dn wt
= 108k, rt wt = 156k. Calculated ECD = 11.37, Actual = 11.57,
ADT = 2.85
14:30 - 16:30 2.00 DRILL P PROD1 Pump 25 bbl high vis sweep, 532 gpm, 3650 psi, 170 rpm,
torque 20.8k, circulate until shakers cleaned up.
16:30 - 17:30 1.00 DRILL P PROD1 Monitor well, (notified 5700 of wet trip planned during normal
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/6/2005 16:30 - 17:30 1.00 DRILL P PROD1 rig operations, each stand pulled spills 1.6 bbls drilling mud to
rig floor), POH wet from 14,338' to 13,868 with out pumping,
made up topdrive and pumped dry job, blow down topdrive.
Continue POH from 13,868', pulled tight at 13,650' 30k began
swabbing, attempt to work through, no progress.
17:30 - 00:00 6.50 DRILL P PROD1 Made up top drive, break circulation, as pumps were brought
on line, hole was partially packed off, worked free, back ream
out from 13,650' to 11,500, 520 gpm, 3,400 psi, 70 rpm, torque,
14 to 18k. Maintaining pulling speed at 20 fpm, starts packing
off if pulled faster. calculated ECD 11.2, actual 12.0, getting a
significant amount of fine sand, and occasional large (quarter
size) chunks of coal across shakers while pumping out.
4/7/2005 00:00 - 07:00 7.00 DRILL P PROD1 Continue back reaming out from 11,500' to 7,257',515 gpm,
3,000 psi, 85 rpm, torque 8.5k, continue seeing steady amount
of fine sand at 10,700' ,started seeing more large chunks of
coal.
07:00 - 10:00 3.00 DRILL P PROD1 Circulate sweep around at 515 gpm, 3000 psi, 70 rpm, 5-6k
10:00 -11:00 I torque, up wt = 86k, dn wt = 84k, rt wt = 85k, circulate an
additianl 3 bottoms up before shakers cleaned up.
1.00 DRILL P PROD1 Change out topdrive saver sub and bell guide from 4 1/2" IF to
4" HT40, service pipe handler.
11:00 -13:00 2.00 DRILL P PROD1 Monitor well, pump dry job, POH from 7,257' to 4,726', hole
took proper fill, at 4,726' started pulling tight 10-20K and
swabbing.
13:00 - 16:00 3.00 DRILL P PROD1 Made up topdrive and began back reaming from 4,726', pulling
tight, torque spiking and packing off, reduced pump rate to 330
gpm, to minimize pack off, 1065 psi, 70 rpm, torque 3-5k, back
ream to 9 5/8" shoe at 4,055'
16:00 - 17:00 1.00 DRILL P PROD1 Circulate bottoms up once inside shoe, 500 gpm, 2,025 psi,
120 rpm, torque 4k, mud at bottoms up was thick 200+ vis, a
lot of fine solids, circulate until clean.
17:00 - 20:00 3.00 DRILL P PROD1 Pulled 2 stands without pumping to 3,860', hole not taking
proper fill inside casing, made up topdrive and back ream out
from 3,860' to 2,759', 500 gpm, 1,820 psi, 70 rpm, torque,3k,
no cuttings coming over shakers while back reaming. Pulled
from 2,759' to 2,579' without pumping, hole taking proper fill.
20:00 - 21 :30 1.50 DRILL P PROD1 Pump dry job and POH from 2,579' to BHA
21 :30 - 00:00 2.50 DRILL P PROD1 Monitor well, PJSM on handling sources, Lay down SHA per
Directional driller.
4/8/2005 00:00 - 00:30 0.50 DRILL P PROD1 Lay down remaining BHA.
00:30 - 01 :30 1.00 DRILL P PROD1 Clear and clean floor and service topdrive.
01 :30 - 03:30 2.00 PXA P ASAN Make up 4" HT 40 mule shoe, RIH with mule shoe to 4,008'
03:00 - 04:30 1.50 PXA P ASAN Cut and slip drilling line.
04:30 - 06:00 1.50 PXA P ASAN Continue RIH with mule shoe from 4,008' to 6,996'
06:00 - 07:00 1.00 PXA P ASAN Change out topdrive saver sub and bell guide, from 4" to 5"
07:00 - 10:30 3.50 PXA P ABAN RIH with 4" mule shoe on 5" DP from 6,996' to 14,267', make
up topdrive and wash down at 2 bpm from 14,267' to 14,338'
10:30 - 15:00 4.50 PXA P ASAN Lay down 1 joint of 5" DP, make up top drive, stage up pumps
to 420 gpm, 2250 psi, 70 rpm, torque 17 to 18k, mud coming
back thick and clabbered up, 200 plus viscosity, Increase rate
to 535 gpm after mud was thinned back.
15:00 - 16:00 1.00 PXA P ASAN PJSM, pump 5 bbls water and test lines to 3,500 psi, pumped
remaing 10 bbls water, pump 68 bbls 15.8 ppg class G cement,
Printed: 4/25/2005 10:24: 11 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
l-212
l-212
DRlll+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/8/2005 15:00 - 16:00 1.00 PXA P ABAN initial rate 4 bpm at 1,050 psi, final rate 4 bpm at 625 psi, wash
up lines thru tee, and pump 2.5 bbls water behind, displace
with rig pumps @ 6.5 bpm at 850 psi, with 180 bbls mud to
balance plug, final rate 3.5 bpm @ 1,100 psi. When cement
was going down hole thick mud was noticed at shakers 80 to
100 viscosity.
16:00 - 17:00 1.00 PXA P ABAN POH 12 stands wet from 14,328' to 13,204' hole not taking
fluid, swabbed 7 bbls, notified 5700 of wet pipe being pulled, 12
stands pulled spilled 1.6 bbls each for a total of 816 gallons.
17:00 - 20:00 3.00 PXA P ABAN Made up topdrive, break circulation slowly, hole partially
packed off, stage up pumps and work pipe until full circulation
was regained, increased rate to 500 gpm, 2,725 psi, rotating
string 70 rpm, torque 17k. Trace of cement at bottoms up, PH
increased to 10.5.
20:00 - 22:00 2.00 PXA P ABAN POH from 13,204' hole swabbing, made up topdrive and
pumped out from 13,204' to 12,050' 500 gpm, 3050 psi.
Notified 5700 of 12 stands of wet pipe being pulled, spilled a
total of 816 gallons of drilling mud to rig floor.
22:00 - 23:00 1.00 PXA P ABAN Circulate bottoms up at 12,050', 500 gpm, 2900 psi, 70 rpm,
14k torque. Cementers priming up and adding accelerator to
Forma-Plug pill.
23:00 - 00:00 1.00 PXA P ABAN Pump 5 bbls water and test lines to 3,500 psi, pump 25 bbls
high vis 10.2 ppg sweep with rig pumps @ 6.5 bpm 1,035 psi,
switch over to Schlumberger and pump 15 bbls of Forma-Plug,
at 3.5 bpm, 655 psi, followed by 3 bbls water, switch over to rig.
4/9/2005 00:00 - 00:30 0.50 PXA P ABAN Pump 10 bbls 10.2 ppg high vis sweep and displace plug out of
pipe with 145 bbls 10.2 ppg mud, initial rate 6.5 bpm, @ 1277
psi, final rate 3 bpm @ 765 psi. Plug in place at 00:30 hrs.
00:30 - 01 :30 1.00 PXA P ABAN Rig down cement line, POH 5 stands wet from 12,050 to
11,593', hole taking correct fill after 3 stands were pulled.
01 :30 - 02:30 1.00 PXA P ABAN Circulate bottoms up @ 11,593', 500 gpm 2,700 psi, 70 rpm,
torque 14k, no visiual sign of Forma-Plug to surface.
02:30 - 06:30 4.00 PXA P ABAN Circulate at 4 bpm, 610 psi, reciprocating pipe, while waiting on
Forma-Plug to set. Schlumberger personelleft location, due to
16 hr work limitation, Cement crew will be back at 08:00 hrs.
06:30 - 07:00 0.50 PXA P ABAN Wash down from 11,593' to 11,850' 4 bpm, 660 psi.
07:00 - 08:30 1.50 PXA P ABAN Circulate bottoms up at 11,850, 500 gpm, 2,855 psi, up wt =
198k, dn wt = 65k, had a small amount of Forma-Plug to
surface at bottoms up.
08:30 - 10:30 2.00 PXA P ABAN PJSM, with Schlumberger, Pump 5 bbls water and test lines to
3,500 psi, pump an additional 1 0 bbls water, followed by 106
bbls 15.8 ppg class G cement, initial rate 4.9 bpm @ 1867 psi,
final rate 4.3 bpm @ 896 psi, pump 2.5 bbls water behind, and
displace with 131 bbls at 6.5 bpm, @ 1,100 psi.
10:30 - 12:00 1.50 PXA P ABAN POH slow from 11,850 to 10,235', the first 5 stands pulled were
wet.
12:00 - 13:00 1.00 PXA P ABAN Drop DP wiper dart and circulate bottoms up, 435 gpm, 2160
psi, up wt = 100k, dn wt = 92k, 70 rpm, toque 13k, trace of
cement to surface.
13:00 - 14:00 1.00 PXA P ABAN Rig up cement line, PJSM with Schlumberger, pump 5 bbls
water and test lines to 3,500 psi, pump remaing 10 bbls water,
followed by 92 bbls 15.8 ppg class G cement, initial rate 5.2
bpm @ 1710 psi, final rate 2.2 bpm @ 333 psi, pump 2.5 bbls
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/9/2005 13:00 - 14:00 1.00 PXA P ABAN water behind and displace with 103 bbls to balance plug @ 6.5
bpm 1400 psi.
14:00 - 15:30 1.50 PXA P ABAN Rig down cement line, POH from 10,235' to 8,630' first 3
stands were pulled wet.
15:30 - 17:30 2.00 PXA P ABAN Circulate bottoms up, 490 gpm, 1900 psi, 70 rpm, 10k torque,
drop DP wiper dart, trace of cement to surface,
17:30 - 00:00 6.50 PXA P ABAN Monitor well, pump dry job and POH, lay down 52 joints of 5"
DP, Continue POH racking back 4" DP, lay down 2 joints of 4"
DP for hard banding.
4/10/2005 00:00 - 03:00 3.00 PXA P ABAN Continue POH standing back 4" DP, lay down mule shoe. laid
down 72 joints of 4" DP for hard banding.
03:00 - 03:30 0.50 PXA P ABAN Clear and clean floor.
03:30 - 05:00 1.50 PXA P ABAN RIH with 60 stds of 5" DP
05:00 - 10:00 5.00 PXA P ABAN POH, lay down 180 joints 5" DP.
10:00 - 11 :30 1.50 PXA P ABAN Change out topdrive saver sub and guide from 5" to 4" HT 40,
adjust pipe handler.
11 :30 - 12:30 1.00 PXA P ABAN Pull wear ring and install test plug, rig up BOP test equipment.
12:30 - 17:00 4.50 PXA P ABAN Test BOPE to 250 psi low, 4,000 psi high, test annular to 250
psilow, 3,500 psi high per Nabors testing procedure, WSL Jeff
Cutler witnessed BOP test, Chuck Scheeve with AOGCC
waived witness of BOP test.
17:00 - 17:30 0.50 PXA P ABAN Rig down test equipment, install wear ring.
17:30 - 21 :00 3.50 STKOH P PROD1 PJSM, pickup BHA #6, Hycalog DS70FNPV, Motor (1.15), XO
(float sub), NM stab, LWD/CDR, MWD, ADN, 2 NM DCs, Saver
sub, 1 jt 5" HW, Jar, 1 Jt 5" HW, XO,
21 :00 - 00:00 3.00 STKOH P PROD1 RIH with BHA #6, Pickup 98 joints 4" DP from shed, to 4,063'
4/11 /2005 00:00 - 01 :00 1.00 STKOH P PROD1 Circulate DP volume at 9 5/8" shoe, up wt = 115k, dn wt =65k
service topdrive.
01 :00 - 02:00 1.00 STKOH P PROD1 RIH with BHA #6 from 4,063', took weight @ 4,525' work tight
hole from 4,525' to 4,700' without pumping, no other hole
problems, pickup remaining 31 joints of 4" DP from shed,
02:00 - 06:00 4.00 STKOH P PROD1 RIH with BHA #6 with 4" pipe from derrick, worked pipe through
tight spots from 6,420' to 6,560', intermitent down drag from
6,560 to 8,877'
06:00 - 07:00 1.00 STKOH P PROD1 Make up topdrive, break circulation, jets plugged, 27 gpm,
3,195 psi, unplug jets and regained partial circulation, up wt
160k, dn wt = 50k
07:00 - 08:30 1.50 STKOH P PROD1 Work pipe at 8,877' hole packing off, 390 gpm, 2,933 psi, 70
rpm, torque 10-20k,
08:30 - 09:30 1.00 STKOH P PROD1 Back ream out slowly from 8,877' to 8,767', 465 gpm, 3,617
psi, 70 rpm, torque 18k, st wt = 100k, until full circulation was
regained.
09:30 - 10:00 0.50 STKOH P PROD1 Ream down from 8,867', 465 gpm, 3,650 psi, 35 rpm, tag
cement @ 8,909', Pulled above plug, shut down pumps, set
down, 30k to confirm top of cement.
10:00 - 16:00 6.00 STKOH P PROD1 Attempt to POH with out pumping, hole swabbing, Make up
topdrive, back ream out from 8,909', 465 gpm, 3,605 psi, 70
rpm, torque 13k, hole started packing off at 7,230', temporarily
stuck, several times, bled pressure off, torque and slump to get
free, attempt back reaming slowly at reduced flow rate, 300
gpm, 1,700 psi, 70 rpm, torque 8 to 20k, continued packing off
no forward progress made, Shakers loaded up with quarter to
fist sized chunks of coal.
Printed: 4/25/2005 10:24: 11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/11/2005 16:00 - 20:00 4.00 STKOH P PROD1 RIH 1 stand to 7,360', circulate and condition mud, weight up
from 9.9 ppg to 10.4 ppg, lower fluid loss from 8 to 7, with
Resinex and Asphasol.
20:00 - 00:00 4.00 STKOH P PROD1 Back ream out from 7,360', 475 gpm, 3,160 psi, 70 rpm torque
9.8k, rt wt 95k, started trying to packoff and torque up @ 7,190'
reduce flow rate to 380 gpm, back reamed slow from 7,190' to
7,000' no further hole problems, increasd rate to 465 gpm,
continued back reaming to 5,680'
4/12/2005 00:00 - 01 :30 1.50 STKOH P PROD1 Continue back reaming out from 5,680' to 4,374',485 gpm,
2,460 psi, 70 rpm, torque 7k.
01 :30 - 02:30 1.00 STKOH P PROD1 Displace well over to new 9.0 ppg LSND mud, 490 gpm, 1956
psi, 80 rpm, torque 6.8k
02:30 - 03:00 0.50 STKOH P PROD1 Establish base line ECD and SPR with new mud, Calculated =
9.7 Actual = 9.8, POH two stands to 4,180'
03:00 - 03:30 0.50 STKOH P PROD1 Time drill from 4,180' to 4,200' @ 20 fph, 550 gpm, 2140 psi,
100 rpm, torque 6.5k,
03:30 - 07:30 4.00 DRILL P PROD1 Directional drill from 4,200' to 4,748, gradually increasing WOS
to 5 - 10k, 580 gpm, 2,670 psi on bottom, 2,580 psi off bottom
100 rpm, torque 7k .on bottom, 7k off bottom. AST - 0.58, ART
- 1.57Sack Brake failed on top drive.
07:30 - 10:30 3.00 DRILL N RREP PROD1 POH from 4,748' to 4,444' PU - 135K, SO - 60K. Well started
to swab. Sackream out to the 9-5/8" casing shoe @ 465 gpm,
2,080 psi, 70 rpm, 7-10K
10:30 - 11 :30 1.00 DRILL N RREP PROD1 Repair top drive.
11 :30 - 13:00 1.50 DRILL P PROD1 Service the top drive. Lubricate the rig. Slip and cut 84' of
drilling line.
13:00 - 14:00 1.00 DRILL N RREP PROD1 RIH with 1 stand of 4" DP. CBU and obtain ECD baseline -
10.3 EMW. RIH with 4" DP to 4,748'.
14:00 - 00:00 10.00 DRILL P PROD1 Drill directionally from 4,748' to 6,149' - PU - 140K, SO - 66K,
Rot - 89K, 100 rpm, 580 gpm, 3,380 psi, TO on - 10K, TO off-
9K, Calculated ECD - 10.34, Actual ECD - 10.77, AST - 2.0,
ART - 2.08
4/13/2005 00:00 - 12:00 12.00 DRILL P PROD1 Drill directionally from 6,149' to 7,791 '. PU - 160K, SO - 68K,
Rot - 100K, 100 rpm, 550 gpm, 3,600 psi on, 3,400 psi off, TO
on - 11 K, TO off - 10K. AST - 1.98, ART - 3.34. Pump Hi-visc
sweeps every 500'. Calc ECD - 10.33 EMW, Actual ECD -
10.79 EMW.
12:00 - 15:30 3.50 DRILL P PROD1 Drill directionally from 7,791' to 8,339'. PU - 160K, SO - 72K,
Rot - 100K, 100 rpm, 550 gpm, 3,600 psi on, 3,400 psi off, TO
on - 12K, TQ off - 10K.
15:30 - 16:00 0.50 DRILL N SFAL PROD1 Repair swab on #2 pump.
16:00 - 17:30 1.50 DRILL P PROD1 Drill directionally from 8,339' to 8,479'. PU - 165K, SO - 72K,
Rot - 104K, 100 rpm, 550 gpm, 3,800 psi on, 3,700 psi off, TQ
on - 13K, TO off - 10K.
17:30 - 20:00 2.50 DRILL N SFAL PROD1 Replace valves, seats and liners on #2 pump.
20:00 - 00:00 4.00 DRILL P PROD1 Drill directionally from 8,479' to 8,845' (TD). PU - 168K, SO-
74K, Rot - 108K, 100 rpm, 550 gpm, 3,800 psi on, 3,700 psi
off, TQ on - 13K, TO off - 10K. Calc ECD - 10.2 EMW, Actual
ECD - 10.83 EMW. ART - 4.23 from noon to midnight.
4/14/2005 00:00 - 02:15 2.25 DRILL P PROD1 Circulate sweep surface to surface. Circulate to bring ECD's to
within 0.3 ppg of calculated - 545 gpm, 3,700 psi, 120 rpm, TO
- 11.5K. Calculated ECD - 10.24, Actual ECD - 10.54. Monitor
well - stable.
Printed: 4/25/2005 10:24:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
L-212
L-212
DRILL+COMPLETE
NABORS ALASKA DRILLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/14/2005 02:15 - 05:00 2.75 DRILL P PROD1 POH from 8,845' with 4" DP. Pulled first 4 stands slowly-
trying to swab. Screw into the 5th stand and pump out with
400 gpm, 2,300 psi - slightly packing off. Backream out of the
hole from 8,667' with stands 6 to 11 to above the ghost reamer
depth @ 7,826' with 450 gpm, 75 rpm, 2,800 psi, TQ - 14K.
05:00 - 08:00 3.00 DRILL P PROD1 POH without pumps from 7,826' to 7,081', PU - 172K, SO-
65K. Pump dry job. Continue POH to 4,558'. Hole started
swabbing and packing off. Lost -88 bbls to the formation while
working pipe and attempting to regain returns. Worked pipe
down to 4,934' and regained full returns. Circulate the hole
clean - ECD=10.5 EMW.
08:00 - 12:00 4.00 DRILL P PROD1 Backream from 4,934' to 4,055' - 9-5/8" shoe. PU - 125K, Rot-
83K, 500 gpm, 2,300 psi, 75 rpm.
12:00 - 12:30 0.50 DRILL P PROD1 Circulate sweep at the shoe - 508 gpm, 2,240 psi.
12:30 - 13:00 0.50 DRILL P PROD1 Service the top drive and lubricate the rig.
13:00 - 15:30 2.50 DRILL P PROD1 RIH without losses from 4,001' to 8,845' with -15K drag max.
15:30 - 19:00 3.50 DRILL P PROD1 Circulate on bottom and condition mud to run casing. Had
some gas to surface on bottoms up. Continued to circulate the
hole with 3 more bottoms up to reduce ECD prior to trip out.
Monitor the well - well flowing slightly. Circulate another
bottoms up. No gas seen at surface. Monitor the well - stable.
No losses.
19:00 - 00:00 5.00 DRILL P PROD1 Hole started swabbing off bottom. Pump out of the hole
without rotation from 8,845' to 7,081' - 500 gpm, 2,900 psi. No
losses.
4/15/2005 00:00 - 01 :30 1.50 DRILL P I PROD1 Pump out of the hole without rotation from 7,081' to 6,427' -
500 gpm, 2,900 psi. No losses. Able to pull without pumps
from 6,427' to the 9-5/8" shoe @ 4,055'.
01:30 - 02:15 0.75 DRILL P PROD1 Circulate bottoms up at the 9-5/8" shoe - Nothing seen at the
shakers. Pump Dry job.
02:15 - 03:15 1.00 DRILL P PROD1 POH from 4,055' to the top of the BHA @ 2,041'.
03:15 - 07:00 3.75 DRILL P PROD1 LD BHA #6 from 2,041'. PJSM. Download nuclear source. LD
remaining BHA.
8-3/4" DS70 graded: 3/3/ BT / A / X / I / PN / TD
07:00 - 07:30 0.50 DRILL P PROD1 Clean and clear the floor.
07:30 - 09:30 2.00 BOPSU P PROD1 Flush the stack, pull the wear ring and make a dummy run with
the 7" hanger.
09:30 - 11 :00 1.50 BOPSU P PROD1 Change out the upper rams to 7". Test door seals to 3,500 psi.
11 :00 - 13:30 2.50 CASE P RUNPRD RU 7" 26# L-80 BTC-m casing handling equipment.
13:30 - 14:00 0.50 CASE P RUNPRD PJSM. MU 7" shoe track and RIH. Bakerloc float equipment
connections. Check floats - good.
14:00 - 20:00 6.00 CASE P RUNPRD PU 7" 26# L-80 BTC-m casing and RIH to the 9-5/8" shoe @
4,055'. Torque each connection to 7,000 ft-Ibs. Use Best-o-life
2000 thread compound on each connection. Fill each joint with
the Franks fillup tool. Circulate down every 15 joints.
20:00 - 20:30 0.50 CASE P RUNPRD Circulate bottoms up at the 9-5/8" shoe. PU - 109K, SO - 79K
with the pumps off.
4BPM - 360 psi
5BPM - 420 psi
6BPM - 490 psi
20:30 - 00:00 3.50 CASE P RUNPRD PU 7" 26# L-80 BTC-m casing and RIH from the 9-5/8" shoe @
Printed: 4/25/2005 10:24: 11 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
l-212
l-212
DRlll+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/15/2005 20:30 - 00:00 3.50 CASE P RUNPRD 4,055' to 5,654'. Fill each joint with the Franks fillup tool.
Break circulation every 10 joints and circulate down every 15
joints. Had to reduce running speed to keep from pushing fluid
away.
Lost 20 bbls of mud while running casing to 5,654'.
@ 5,488'
Pumps on: PU - 145K, SO - 80K
Pumps off: PU - 148K, SO - 82K
4/16/2005 00:00 - 05:00 5.00 CASE P RUNPRD PU 7" 26# L-80 BTC-m casing and RIH from 5,654' to 8,832'.
Fill each joint with the Franks fillup tool. Break circulation every
10 joints and circulate down every 15 joints.
05:00 - 07:00 2.00 CASE N WAIT IRUNPRD Casing on bottom @ 0700 hours, but we slowed our running
speed to not have to get on bottom too early due to trucks not
being available. We did this to not compound the problem if
we did not have returns once on bottom. Estimate we could
have been on bottom 2 hours earlier.
07:00 - 07:30 0.50 CASE P RUNPRD MU hanger on landing joint and land casing. RU the cement
head and cement lines.
07:30 - 10:00 2.50 CEMT P RUNPRD Circulate and condition the mud. Slowly stage the pumps up to
7 bpm while reciprocating. PU - 216K, SO - 78K
10:00 - 11 :00 1.00 CEMT N WAIT RUNPRD Circulate an extra hour while waiting on trucks for cement job.
11 :00 - 12:30 1.50 CEMT P RUNPRD Held PJSM. Prime up the cementers and batch up the cement
while continuing to circulate. Pump 2 bbls fresh water ahead.
Shut in and pressure test the surface lines to 4,000 psi. Bleed
off pressure and pump 10 bbls of CW100 pre-flush spacer @ 5
bpm and 400 psi. Pump 27.2 bbls 10.5 ppg Mudpush II spacer
@ 4.6 bpm and 385 psi. Drop top plug and pump 90 bbls of
15.8 ppg Class G cement + adds @ 6.5 bpm and 600 psi
initial, 420 psi final. Wash cement lines through a "T" on the
rig floor with 5 bbls of water. Drop the top plug and displace
with seawater @ 6 bpm and 290 psi. Drop rate to 3 bpm to
bump the plug. Pressure prior to bumping was 1,120 psi @ 3
bpm. Bumped the plug with 5,794 strokes, -334 bbls @ 95%
efficiency.
CIP @ 1230 hours 4/16/2005.
12:30 - 13:00 0.50 CEMT P RUNPRD Increase pressure to 4,000 psi. Chart and hold for 30 minute
casing pressure test. Check floats - good.
13:00 - 14:00 1.00 WHSUR P RUNPRD Install packoff and test to 5,000 psi.
14:00 - 16:00 2.00 CASE P RUNPRD RD casing handling equipment.
16:00 - 16:30 0.50 CASE P RUNPRD Service the top drive, blocks and the crown.
16:30 - 19:00 2.50 BOPSU P RUNPRD Change out the 7" rams to variables. Test to 250 psi /4,000
psi. Install wear ring.
19:00 - 21 :00 2.00 P OTHCMP PJSM. PU handling tools. MU SLB 4.5" PJ 5 spf perf guns to
507'.
21 :00 - 22:30 1.50 P OTHCMP MU firing head, 2-7/8" x 3-1/2" XO, 1 stand 3-1/2" HWDP,
bumper sub, MWD, 1 stand 4" HWDP, 5' pup, 7 stands HWDP
to 1,395'. shallow test MWD - good.
22:30 - 00:00 1.50 P OTHCMP RIH with perf guns from 1,395' to 4,100'.
4/17/2005 00:00 - 03:30 3.50 P OTHCMP RIH with perf guns from 4,100' to 7,596' (GR @ 6,956'). RUto
Printed: 4/25/2005 10:24: 11 AM
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
l-212
l-212
DRlll+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
4/17/2005 the top drive and pump @ 200 gpm, 550 psi and log down to
find the top RA marker. Found RA marker - 6' low (6,969'
instead of 6,963'). Slow down the top drive. RIH to 8,300'.
03:30 - 08:30 OTHCMP RU to the top drive and log down from 8,300' (GR @ 7,661 ') to
8,559' at 60'/hour to correlate perf depths with formation
markers and find the lower RA marker @ 200 gpm, 550 psi.
Disconnect from the top drive and RIH without pumps from
8,559' and tag the float collar @ 8,752' - 6' deep.
Simops: Cement compressive strength> 500 psi. Inject 45
bbls mud down the 9-5/8" x 7" annulus to ensure free prior to
freeze protecting @ 2 bpm, 500 psi. Freeze protect well with
86 bbls of dead crude.
08:30 - 09:00 0.50 PERFO P OTHCMP Correlate perforation depths with the logs. POH from 8,752'
and spot the guns on depth with the top shot @ 8,050' and the
bottom of the guns @ 8,516'.
09:00 - 11 :00 2.00 PERFO P OTHCMP Displace the well over to 9.2 ppg kill weight brine.
11 :00 - 12:00 1.00 PERFO P OTHCMP Perforate the well. POH to 7,929' to spOt the guns over the top
perf and monitor the well -1 0 bblloss.
4.5" Schlumberger PowerJet 5 spf depths:
8,050' - 8,116'
8,156' - 8,182'
8,394' - 8,516'
12:00 - 16:30 4.50 PERFO P OTHCMP Monitor the well - 12 bph losses. LD 4" DP from 7,929' to the
top of the 4" HWDP @ 1,395'.
16:30 - 17:30 1.00 PERFO OTHCMP Cut and slip drilling line.
17:30 - 19:00 1.50 PERFO OTHCMP LD Perforating BHA from 1,395' - 7 stands HWDP, 5' pup, 1
stand 4" HWDP, MWD, bumper sub, 1 stand 3-1/2" HWDP,
2-7/8" x 3-1/2" XO, and firing head with debris sub.
19:00 - 22:30 3.50 PERFO P OTHCMP PJSM. LD perf guns from 516' - all shots fired. Clean and
clear the floor.
22:30 - 23:00 0.50 PERFO OTHCMP RIH with remaining 16 stands of 4" DP from the derrick.
23:00 - 00:00 1.00 PERFO OTHCMP LD 48 joints of 4"DP.
Total losses for the day - 116 bbls
4/18/2005 00:00 - 08:30 8.50 CLEAN P CLEAN PJSM. RU Schlumberger wireline for GR/JB and USIT.
Run #1: 6.125" GR/JB to 2,000' - encountered resistance while
running in the hole. POH. Recovered -1 gallon of solids
(cement) and some metal.
Run#2: Change GR to 6.06" and RIH to 8,663' (ELM) and hit
restriction. POH and remove -3 gallons of solids (cement) and
metal.
Run#3: RIH to 8,666' and hit restriction. POH. Recovered
-1.5 gallons of solids (cement) and metal.
Run #4: RIH to 8,670' and hit restriction. POH. Recovered
0.5 gal of solids (cement).
Run #5: RIH to 8,670' and hit restriction. POH. Recovered
0.5 gal of solids (cement).
08:30 - 09:00 0.50 CLEAN N WAIT CLEAN Wireline unit required for OH logs on Nabors 2ES. RD unit and
equipment.
09:00 - 12:00 3.00 CLEAN N WAIT CLEAN Wait on another Schlumberger unit to arrive. While waiting,
Printed: 4/25/2005 10:24: 11 AM
'9
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
l-212
l-212
DRlll+COMPlETE
NABORS ALASKA DRilLING I
NABORS 9ES
Start: 3/22/2005
Rig Release: 4/19/2005
Rig Number:
Spud Date: 3/23/2005
End: 4/19/2005
09:00 - 12:00 3.00 CLEAN WAIT CLEAN check the top drive for leaks and service the top drive.
12:00 - 13:00 1.00 CLEAN WAIT CLEAN PJSM. RU SLB wireline unit.
13:00 - 17:00 4.00 EV AL OTHCMP RIH with wireline to 8,670' and log up with the US IT.
17:00 - 18:00 1.00 EVAL OTHCMP RD Schlumberger.
18:00 - 20:00 2.00 RUNCO RUNCMP Pull wear ring and make dummy run with the tubing hanger.
RU tubing handling equipment
20:00 - 00:00 4.00 RUNCMP MU bottom 3.5" 9.3# L-80 TCII completion. Bakerloc'd all
connections below lowest packer. Used Jet Lube Seal Guard
on all connections above the lowest packer. Torqued each 3.5"
connection to 2,300 ft-Ibs. Crossover to 4.5" 12.6# L-80 TCII
and run completion to 1,846'. Used Jet Lube Seal Guard on all
connections. Torqued 4.5" to 3,850 ft-Ibs.
4/19/2005 00:00 - 07:30 7.50 RUNCO RUNCMP RIH with 4.5" 12.6# L-80 TCII from 1,846'. Used Jet Lube Seal
Guard on all connections. Torqued 4.5" to 3,850 ft-Ibs. Ran a
total of 183 joints of 4.5" and 7 joints of 3.5". PU - 110K, SO-
70K. Land in with tubing hanger.
07:30 - 09:00 1.50 RUNCO RUNCMP RU Schlumberger Wireline to log well and correlate packer
depths.
09:00 - 10:30 1.50 RUNCO RUNCMP RIH with Gamma tool and log the well. Packers on depth.
POH.
10:30 - 11 :00 0.50 RUNCO RUNCMP RD Schlumberger.
11 :00 - 11 :30 0.50 RUNCO RUNCMP RD tubing handling equipment.
11 :30 - 12:30 1.00 RUNCO RUNCMP RILDS and RU circulation lines. Reverse circulate 2.5 bbls of
9.2 ppg brine with CI and chase with 145 bbls clean 9.2 ppg
brine - 3 bpm, 250 psi.
12:30 - 14:00 1.50 RUNCO RUNCMP Drop ball and rod and land in RHC-m plug in X profile @ 8,406.
Pressure up on the tubing to 4,200 psi and set the packers.
Hold pressure for 30 minutes and chart for tubing test - good.
Bleed pressure to 2,500 psi and pressure up on the annulus to
4,000 psi. Chart and hold for 30 minutes - good. Bleed the
annulus back to 0 psi and then bleed the tubing pressure to 0
psi. Pressure up on the annulus to 2,700 psi and observe the
DCK shear in the GLM @ 7,710'.
14:00 - 17:00 WHDTRE Install TWC and test from below to 1,000 psi - good. ND
BOP's.
17:00 - 20:00 WHDTRE NU tree and adapter flange. Test tree to 5,000 psi - good. Pull
TWC with DSM
20:00 - 23:30 RUNCMP RU LRHOS. Pump 103 bbls (3,000') of freeze protection diesel
@ 2 bpm - 500 psi initial, 800 psi final. Allow to u-tube from the
annulus to the tubing.
23:30 - 00:00 0.50 WHSUR P WHDTRE Install BPV and test from below to 1,000 psi. RDMO L-212i.
Rig released @ 2359 hours 4/19/2005.
Printed: 4/25/2005 10:24: 11 AM
L-212 Survey Report Schlumberger
Report Date: 14-Apr-05 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 355.000'
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 It, E 0.000 It
Structure 1 Slot: L-PAD 1 L-212 TVD Reference Datum: Rotary Table
Well: L-212 TVD Reference Elevation: 77.80 It relative to MSL
Borehole: L-212 Sea Bed 1 Ground Level Elevation: 52.000 It relative to MSL
UWUAPI#: 500292325200 Magnetic Declination: 24.507'
Survey Name 1 Date: L-2121 April 14, 2005 Total Field Strength: 57608.959 n T
Tort 1 AHD 1 DDII ERD ratio: 163.629' /6855.45 It! 6.319/1.441 Magnetic Dip: 80.811'
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 13, 2005 .
Location Lat/Long: N 70.35067585, W 149.32418283 Magnetic Declination Model: BGGM 2004
Location Grid NlE YIX: N 5978297.430 ItUS, E 583238.450 ItUS North Reference: True North
Grid Convergence Angle: +0.63646655' Total Corr Mag North -> True North: +24.507'
Grid Scale Factor: 0.99990787 Local Coordinates Referenced To: Well Head
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Easting Latitude Longitude
Depth
It
RTE 0.00 N 70.35067585 W 149.32418283
First MWD+IFR+MS 299.00 N 70.35067818 W 149.32417758
392.31 N 70.35068288 W 149.32418219
485.07 N 70.35069652 W 149.32418759
577.34 N 70.35071894 W 149.32415321
Tie-In Survey 674.38 10.66 57.18 594.67 672.47 24.10 32.87 29.91 25.56 15.54 3.92 5978323.15 583253.70 N 70.35074567 W 149.32405667
MWD+IFR+MS 765.11 11.11 38.65 683.79 761.59 34.35 49.86 46.38 36.93 28.06 3.87 5978334.67 583266.09 N 70.35077675 W 149.32395506
860.95 13.31 22.94 777.48 855.28 50.78 70.00 66.36 54.31 38.13 4.14 5978352.16 583275.97 N 70.35082423 W 149.32387330
956.01 14.74 8.33 869.74 947.54 72.22 92.92 88.21 76.36 44.15 4.00 5978374.27 583281.74 N 70.35088447 W 149.32382444
1050.53 17.38 351.16 960.61 1038.41 98.03 118.89 111.19 102.23 43.72 5.72 5978400.13 583281.03 N 70.35095513 W 149.32382791
1145.04 20.67 346.36 1049.95 1127.75 128.61 149.68 137.64 132.40 37.61 3.85 5978430.22 583274.59 N 70.35103755 W 149.3.7
1240.42 25.38 346.06 1137.71 1215.51 165.47 186.97 171.04 168.62 28.72 4.94 5978466.34 583265.29 N 70.35113649 W 149.3 1
1336.39 29.98 347.37 1222.67 1300.47 209.58 231.54 212.81 212.00 18.51 4.83 5978509.60 583254.60 N 70.35125501 W 149.32403254
1432.00 35.76 350.54 1302.95 1380.75 261.15 283.40 263.06 262.91 8.69 6.31 5978560.40 583244.22 N 70.35139410 W 149.32411230
1526.04 40.81 352.28 1376.74 1454.54 319.28 341.64 320.51 320.51 0.04 5.49 5978617.89 583234.93 N 70.35155145 W 149.32418252
1619.71 47.75 354.69 1443.77 1521.57 384.61 407.00 385.51 385.44 -7.29 7.62 5978682.73 583226.88 N 70.35172884 W 149.32424203
1718.76 49.59 355.40 1509.18 1586.98 458.99 481.37 459.74 459.54 -13.71 1.93 5978756.75 583219.64 N 70.35193127 W 149.32429413
1812.17 54.48 354.18 1566.63 1644.43 532.60 554.99 533.24 532.85 -20.42 5.34 5978829.97 583212.11 N 70.35213155 W 149.32434862
1906.71 57.31 353.97 1619.63 1697.43 610.87 633.26 611.37 610.71 -28.50 3.00 5978907.72 583203.17 N 70.35234424 W 149.32441423
2001.62 58.21 354.05 1670.26 1748.06 691.13 713.54 691.53 690.54 -36.88 0.95 5978987.46 583193.91 N 70.35256235 W 149.32448225
2096.34 60.36 354.89 1718.64 1796.44 772.55 794.97 772.89 771.59 -44.72 2.39 5979068.40 583185.17 N 70.35278377 W 149.32454590
2190.19 63.62 355.24 1762.71 1840.51 855.40 877.81 855.70 854.13 -51.84 3.49 5979150.85 583177.13 N 70.35300925 W 149.32460374
2285.89 66.04 354.90 1803.41 1881.21 942.00 964.42 942.28 940.42 -59.29 2.55 5979237.04 583168.73 N 70.35324498 W 149.32466419
SurveyEditor Ver Bld( doc40x_37 )
L-212\L-212\L-212\L-212
Generated 5/12/2005 7:51 AM Page 1 of 3
Com ments Latitude Longitude
N 70.35347968 W 149.32472933
N 70.35371194 W 149.32479599
2569.17 65.24 354.36 1922.95 2000.75 1198.80 1221.23 1198.98 1196.05 -83.75 1.08 5979492.37 583141.43 N 70.35394336 W 149.32486283
2664.41 64.32 354.22 1963.53 2041.33 1284.96 1307.39 1285.11 1281.79 -92.32 0.98 5979577.99 583131.90 N 70.35417758 W 149.32493244
2759.30 65.45 353.55 2003.81 2081.61 1370.86 1393.30 1370.98 1367.22 -101.48 1.35 5979663.31 583121.80 N 70.35441096 W 149.32500678
2853.30 64.69 353.78 2043.43 2121.23 1456.08 1478.54 1456.16 1451.94 -110.88 0.84 5979747.91 583111.46 N 70.35464240 W 149.32508316
2949.72 65.80 353.81 2083.80 2161.60 1543.61 1566.10 1543.68 1538.98 -120.35 1.15 5979834.83 583101.03 N 70.35488020 W 149.32516001
3045.89 64.60 353.95 2124.14 2201.94 1630.90 1653.40 1630.94 1625.78 -129.65 1.25 5979921.52 583090.76 N 70.35511734 W 149.32523560
3141.51 64.82 353.18 2164.99 2242.79 1717.32 1739.86 1717.36 1711.69 -139.34 0.76 5980007.31 583080.12 N 70.35535203 W 149.32531430
3238.62 65.32 354.12 2205.92 2283.72 1805.36 1827.92 1805.38 1799.21 -149.08 1.02 5980094.71 583069.41 N 70.35559113 W 149.32539338
3334.04 65.52 353.52 2245.62 2323.42 1892.11 1914.69 1892.13 1885.48 -158.42 0.61 5980180.86 583059.11 N 70.35582681 W 149.32.5
3428.32 65.21 353.32 2284.92 2362.72 1977.78 2000.39 1977.78 1970.62 -168.24 0.38 5980265.87 583048.34 N 70.35605938 W 149.32 1
3521.47 64.85 353.11 2324.24 2402.04 2062.18 2084.83 2062.18 2054.47 -178.22 0.44 5980349.60 583037.44 N 70.35628846 W 149.32563003
3613.35 64.23 352.93 2363.74 2441.54 2145.09 2167.79 2145.09 2136.81 -188.30 0.70 5980431.81 583026.44 N 70.35651341 W 149.32571191
3708.01 64.59 354.99 2404.62 2482.42 2230.44 2253.16 2230.44 2221.70 -197.28 2.00 5980516.60 583016.52 N 70.35674533 W 149.32578485
3802.85 63.97 354.38 2445.78 2523.58 2315.88 2338.61 2315.89 2306.78 -205.20 0.87 5980601.57 583007.67 N 70.35697775 W 149.32584913
3895.94 63.55 354.58 2486.94 2564.74 2399.38 2422.10 2399.38 2389.89 -213.23 0.49 5980684.58 582998.71 N 70.35720479 W 149.32591437
3984.97 63.39 353.94 2526.71 2604.51 2479.03 2501.76 2479.03 2469.14 -221.19 0.67 5980763.73 582989.87 N 70.35742131 W 149.32597908
4075.00 63.29 356.14 2567.11 2644.91 2559.48 2582.21 2559.48 2549.29 -228.15 2.19 5980843.79 582982.02 N 70.35764027 W 149.32603560
Tie-In Survey 4155.13 64.03 355.26 2602.66 2680.46 2631.28 2654.02 2631.28 2620.90 -233.54 1.35 5980915.33 582975.84 N 70.35783590 W 149.32607935
MWD+IFR+MS 4208.25 62.63 355.29 2626.50 2704.30 2678.75 2701.49 2678.75 2668.21 -237.45 2.64 5980962.58 582971.40 N 70.35796513 W 149.32611112
4300.68 62.57 356.62 2669.04 2746.84 2760.79 2783.55 2760.80 2750.06 -243.23 1.28 5981044.36 582964.71 N 70.35818875 W 149.32615815
4392.48 62.44 356.42 2711.42 2789.22 2842.20 2864.98 2842.20 2831.34 -248.18 0.24 5981125.57 582958.86 N 70.35841080 W 149.32619831
4488.37 62.34 355.84 2755.86 2833.66 2927.15 2949.95 2927.15 2916.12 -253.91 0.55 5981210.27 582952.19 N 70.35864240 W 149.32624491
4580.92 61.58 358.98 2799.38 2877.18 3008.75 3031.63 3008.75 2997.70 -257.61 3.10 5981291.81 582947.58 N 70.35886529 W 149.32627496
4674.50 62.48 358.82 2843.27 2921.07 3091.21 3114.28 3091.22 3080.34 -259.20 0.97 5981374.41 582945.08 N 70.35909103 W 149.32628788
4768.31 62.37 357.80 2886.69 2964.49 3174.22 3197.44 3174.26 3163.45 -261.65 0.97 5981457.48 582941.70 N 70.35931810 W 149.32630781
4860.90 61.99 359.14 2929.91 3007.71 3255.96 3279.32 3256.02 3245.31 -263.84 1.34 5981539.30 582938.61 N 70.35954172 W 149.3.1
4953.49 60.89 0.53 2974.17 3051.97 3336.99 3360.64 3337.09 3326.63 -264.08 1.77 5981620.61 582937.46 N 70.35976388 W 149.3 7
5046.86 60.37 1.81 3019.97 3097.77 3417.88 3442.01 3418.07 3407.98 -262.42 1.32 5981701.96 582938.22 N 70.35998612 W 149.3 12
5139.37 63.94 3.27 3063.17 3140.97 3498.95 3523.80 3499.26 3489.68 -258.78 4.10 5981783.69 582940.95 N 70.36020932 W 149.32628457
5232.66 66.49 2.64 3102.28 3180.08 3582.83 3608.49 3583.30 3574.26 -254.42 2.80 5981868.30 582944.37 N 70.36044037 W 149.32624917
5326.67 65.95 2.88 3140.19 3217.99 3668.07 3694.51 3668.73 3660.18 -250.27 0.62 5981954.26 582947.56 N 70.36067512 W 149.32621555
5419.89 65.27 3.16 3178.68 3256.48 3752.14 3779.41 3753.02 3744.97 -245.80 0.78 5982039.08 582951.09 N 70.36090674 W 149.32617925
5513.49 64.76 3.02 3218.21 3296.01 3836.14 3864.26 3837.27 3829.68 -241.23 0.56 5982123.84 582954.72 N 70.36113818 W 149.32614212
5606.46 63.81 2.58 3258.55 3336.35 3919.12 3948.02 3920.52 3913.35 -237.13 1.11 5982207.53 582957.89 N 70.36136673 W 149.32610890
5700.22 63.66 1.83 3300.05 3377.85 4002.54 4032.10 4004.20 3997.36 -233.90 0.73 5982291.57 582960.19 N 70.36159626 W 149.32608264
5795.20 63.50 0.66 3342.31 3420.11 4087.09 4117.16 4088.99 4082.40 -232.05 1.12 5982376.62 582961.09 N 70.36182857 W 149.32606765
5888.55 64.47 0.79 3383.25 3461.05 4170.56 4201.05 4172.68 4166.28 -230.99 1.05 5982460.50 582961.22 N 70.36205774 W 149.32605904
5981.78 63.69 1.36 3424.00 3501.80 4253.94 4284.90 4256.31 4250.12 -229.42 1.00 5982544.34 582961.86 N 70.36228677 W 149.32604630
6076.05 63.27 1.27 3466.10 3543.90 4337.78 4369.25 4340.41 4334.45 -227.48 0.45 5982628.68 582962.86 N 70.36251715 W 149.32603059
SurveyEditor Ver Bld( doc40x_37 )
L-212\L-212\L-212\L-212
Generated 5/12/2005 7:51 AM Page 2 of 3
Comments Latitude Longitude
N 70.36274520 W 149.32600270
6262.68 64.10 5.87 3550.28 3628.08 4502.47 4535.81 4505.90 4500.65 -217.29 2.78 5982794.97 582971.20 N 70.36297120 W 149.32594786
6354.07 64.97 10.47 3589.59 3667.39 4582.77 4618.31 4586.90 4582.29 -205.56 4.64 5982876.73 582982.03 N 70.36319424 W 149.32585257
6447.26 64.76 12.84 3629.17 3706.97 4663.59 4702.68 4668.72 4664.91 -188.52 2.31 5982959.52 582998.15 N 70.36341995 W 149.32571416
6541.58 66.55 15.21 3668.06 3745.86 4744.82 4788.60 4751.23 4748.27 -167.68 2.97 5983043.10 583018.05 N 70.36364767 W 149.32554493
6634.92 67.93 21.31 3704.20 3782.00 4823.83 4874.66 4832.00 4829.95 -140.71 6.20 5983125.06 583044.12 N 70.36387081 W 149.32532583
6727.71 67.22 20.75 3739.59 3817.39 4900.90 4960.43 4911.24 4910.01 -109.93 0.95 5983205.45 583074.00 N 70.36408953 W 149.32507580
6821.27 67.43 21.07 3775.66 3853.46 4978.55 5046.76 4991.28 4990.65 -79.12 0.39 5983286.42 583103.91 N 70.36430984 W 149.32482552
6915.36 67.13 21.41 3812.00 3889.80 5056.40 5133.55 5071.77 5071.54 -47.68 0.46 5983367.65 583134.45 N 70.36453083 W 149.32457011
7008.74 67.01 21.77 3848.38 3926.18 5133.31 5219.55 5151.54 5151.51 -16.03 0.38 5983447.96 583165.20 N 70.36474929 W 149.32431304
7100.99 65.43 22.18 3885.58 3963.38 5208.54 5303.97 5229.82 5229.79 15.56 1.76 5983526.58 583195.92 N 70.36496315 W 149.32.4
7194.38 64.89 22.72 3924.81 4002.61 5283.74 5388.72 5308.34 5308.12 47.92 0.78 5983605.26 583227.40 N 70.36517713 W 149.323 52
7286.90 64.34 23.93 3964.48 4042.28 5357.32 5472.30 5385.48 5384.87 81.01 1.32 5983682.37 583259.64 N 70.36538682 W 149.32352467
7381.09 64.63 23.52 4005.05 4082.85 5431.87 5557.31 5463.91 5462.69 115.21 0.50 5983760.55 583292.97 N 70.36559941 W 149.32324682
7474.50 64.62 24.95 4045.08 4122.88 5505.51 5641.70 5541.68 5539.65 149.86 1.38 5983837.88 583326.75 N 70.36580965 W 149.32296537
7567.61 65.06 23.48 4084.67 4162.47 5579.06 5725.98 5619.54 5616.51 184.42 1.51 5983915.11 583360.46 N 70.36601962 W 149.32268456
7660.82 64.80 22.48 4124.16 4201.96 5653.62 5810.41 5698.38 5694.24 217.38 1.01 5983993.19 583392.55 N 70.36623196 W 149.32241675
7753.06 64.12 23.76 4163.93 4241.73 5727.02 5893.63 5776.19 5770.78 250.06 1.45 5984070.09 583424.37 N 70.36644106 W 149.32215126
7846.75 63.69 22.65 4205.14 4282.94 5801.17 5977.77 5854.96 5848.11 283.21 1.16 5984147.77 583456.66 N 70.36665231 W 149.32188189
7940.82 63.19 22.12 4247.21 4325.01 5875.88 6061.91 5934.29 5925.91 315.25 0.73 5984225.92 583487.84 N 70.36686485 W 149.32162152
8034.58 62.77 22.23 4289.80 4367.60 5950.19 6145.44 6013.26 6003.26 346.78 0.46 5984303.60 583518.50 N 70.36707616 W 149.32136536
8127.00 63.08 22.53 4331.87 4409.67 6023.26 6227.73 6091.10 6079.35 378.11 0.44 5984380.03 583548.98 N 70.36728403 W 149.32111076
8220.99 62.76 22.31 4374.65 4452.45 6097.55 6311.42 6170.35 6156.71 410.03 0.40 5984457.74 583580.03 N 70.36749537 W 149.32085141
8314.22 62.12 22.75 4417.79 4495.59 6170.84 6394.07 6248.68 6233.05 441.70 0.80 5984534.42 583610.85 N 70.36770392 W 149.32059408
8408.07 61.44 23.68 4462.17 4539.97 6243.71 6476.76 6326.85 6309.05 474.29 1.13 5984610.77 583642.59 N 70.36791154 W 149.32032921
8501 .46 60.78 22.33 4507.29 4585.09 6315.90 6558.53 6404.35 6384.31 506.25 1.45 5984686.37 583673.71 N 70.36811714 W 149.32006952
8594.42 60.35 22.47 4552.97 4630.77 6387.77 6639.49 6481 .46 6459.16 537.10 0.48 5984761.55 583703.72 N 70.36832162 W 149.31981881
8686.86 59.73 22.61 4599.14 4676.94 6458.79 6719.58 6557.76 6533.13 567.80 0.68 5984835.85 583733.60 N 70.36852369 W 149.3.3
Last MWD+IFR+MS 8771.73 59.04 22.42 4642.36 4720.16 6523.56 6792.62 6627.44 6600.61 595.77 0.84 5984903.62 583760.81 N 70.36870801 W 149.3 3
TD ( Projected) 8845.00 59.04 22.42 4680.05 4757.85 6579.34 6855.45 6687.46 6658.69 619.73 0.00 5984961.96 583784.13 N 70.36886668 W 149.31 29
Leaal DescriDtion:
Northina IY) rnUSl Eastina IX) rnUSl
Surface: 2575 FSL 3676 FEL S34 T12N R11 E UM 5978297.43 583238.45
BHL: 3954 FSL 3043 FEL S27 T12N R11 E UM 5984961.96 583784.13
SurveyEditor Ver Bld( doc40x_37 )
L-212\L-212\L-212\L-212
Generated 5/12/2005 7:51 AM Page 3 of 3
L-212PB1 Survey Report
Schlumberger
Report Date: 25-Mar-05
Client: BP Exploration Alaska
Field: Prudhoe Bay Unit - WOA
Structure I Slot: L-PAD I L-212
Well: L-212
Borehole: L-212PB1
UWVAPI#: 500292325270
Survey Name I Date: L-212PB1 / March 25, 2005
Torti AHD I DDII ERD ratio: 16.139' /59.92 It! 2.988 / 0.073
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet
Location Lat/Long: N 70.35067585, W 149.32418283
Location Grid N/E Y/X: N 5978297.430 ItUS, E 583238.450 ftUS
Grid Convergence Angle: +0.63646655'
Grid Scale Factor: 0.99990787
Survey / DLS Computation Method: Minimum Curvature I Lubinski
Vertical Section Azimuth: 355.000'
Vertical Section Origin: N 0.000 It, E 0.000 It
TVD Reference Datum: Rotary Table
TVD Reference Elevation: 77.80 ft relative to MSL
Sea Bed I Ground Level Elevation: 52.000 It relative to MSL
Magnetic Declination: 24.531'
Total Field Strength: 57606.980 n T
Magnetic Dip: 80.810'
Declination Date: March 24, 2005
Magnetic Declination Model: BGGM 2004
North Reference: True North
Total Corr Mag North -> True North: +24.531'
Local Coordinates Referenced To: Well Head
.
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
1ft) (dea) ( dea) lit) (ft) 1ft) (It) (ft) (ft) (ft) (dea/100 It) (ftUS) IftUS)
RTE 0.00 0.00 0.00 -77.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5978297.43 583238.45 N 70.35067585 W 149.32418283
First MWD+IFR+M8 299.00 0.41 37.21 221.20 299.00 0.79 1.07 1.07 0.85 0.65 0.14 5978298.29 583239.09 N 70.35067818 W 149.32417758
392.31 2.02 332.10 314.49 392.29 2.55 2.92 2.57 2.57 0.08 2.02 5978300.00 583238.50 N 70.35068288 W 149.32418219
485.07 4.39 1.61 407.10 484.90 7.59 8.01 7.59 7.57 -0.59 3.03 5978304.99 583237.78 N 70.35069652 W 149.32418759
577.34 7.77 41.49 498.87 576.67 15.40 17.42 16.19 15.77 3.65 5.66 5978313.24 583241.92 N 70.35071894 W 149.32415321
674.38 10.66 57.18 594.67 672.47 24.10 32.87 29.91 25.56 15.54 3.92 5978323.15 583253.70 N 70.35074567 W 149.32405667
Last MWD+IFR+M8 764.43 10.34 68.07 683.22 761.02 30.35 49.23 44.69 33.09 30.04 2.23 5978330.85 583268.12 N 70.35076625 W 149.32393898
TO ( Projected) 824.00 10.34 68.07 741.82 819.62 33.46 59.92 54.51 37.08 39.96 0.00 5978334.95 583277.99 N 70.35077716 W 149.32385846
Leqal Description:
Northinq ey) [flUS] Eastinq eX) [flUS] .
Surface: 2575 FSL 3676 FEL 834 T12N R11 E UM 5978297.43 583238.45
BHL: 2612 F8L 3636 FEL 834 T12N R11 E UM 5978334.95 583277.99
8urveyEditor Ver Bld( doc40x_37 )
L-212IL-212IL-212PB1IL-212PB1
Generated 5/12/2005 7:51 AM Page 1 of 1
L-212PB2 Survey Report
Schlu berDer
Report Date: 9-Apr-05
Client: BP Exploration Alaska
Field: Prudhoe Bay Unit - WOA
Structure I Slot: L-PAD I L-212
Well: L-212
Borehole: L-212PB2
UWUAPI#: 500292325271
Survey Namel Date: L-212PB2 / April 9, 2005
Torti AHDI DDI/ ERD ratio: 248.144' / 11179.62 fI I 6.760 /1.616
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet
Location LaULong: N 70.35067585, W 149.32418283
Location Grid NIE YIX: N 5978297.430 flUS, E 583238.450 flUS
Grid Convergence Angle: +0.63646655'
Grid Scale Factor: 0.99990787
Survey I DLS Computation Method: Minimum Curvature / Lubinski
Vertical Section Azimuth: 355.000'
Vertical Section Origin: N 0.000 It, E 0.000 It
TVD Reference Datum: Rotary Table
TVD Reference Elevation: 77.80 It relative to MSL
Sea Bed I Ground Level Elevation: 52.000 It relative to MSL
Magnetic Declination: 24.518'
Total Field Strength: 57608.069 nT
Magnetic Dip: 80.810'
Declination Date: April 04, 2005
Magnetic Declination Model: BGGM 2004
North Reference: True North
Total Corr Mag North -> True North: +24.518'
Local Coordinates Referenced To: Well Head
.
Comments Measured TVD Easting Latitude Longitude
Depth
It
RTE 0.00 N 70.35067585 W 149.32418283
First MWD+IFR+MS 299.00 N 70.35067818 W 149.32417758
392.31 N 70.35068288 W 149.32418219
485.07 N 70.35069652 W 149.32418759
577.34 N 70.35071894 W 149.32415321
Tie-In Survey 674.38 10.66 57.18 594.67 672.47 24.10 32.87 29.91 25.56 15.54 3.92 5978323.15 583253.70 N 70.35074567 W 149.32405667
MWD+IFR+MS 765.11 11.11 38.65 683.79 761.59 34.35 49.86 46.38 36.93 28.06 3.87 5978334.67 583266.09 N 70.35077675 W 149.32395506
860.95 13.31 22.94 777.48 855.28 50.78 70.00 66.36 54.31 38.13 4.14 5978352.16 583275.97 N 70.35082423 W 149.32387330
956.01 14.74 8.33 869.74 947.54 72.22 92.92 88.21 76.36 44.15 4.00 5978374.27 583281.74 N 70.35088447 W 149.32382444
1050.53 17.38 351.16 960.61 1038.41 98.03 118.89 111.19 102.23 43.72 5.72 5978400.13 583281.03 N 70.35095513 W 149.32382791
1145.04 20.67 346.36 1049.95 1127.75 128.61 149.68 137.64 132.40 37.61 3.85 5978430.22 583274.59 N 70.35103755 W 149..47
1240.42 25.38 346.06 1137.71 1215.51 165.47 186.97 171.04 168.62 28.72 4.94 5978466.34 583265.29 N 70.35113649 W 149. 71
1336.39 29.98 347.37 1222.67 1300.47 209.58 231.54 212.81 212.00 18.51 4.83 5978509.60 583254.60 N 70.35125501 W 149.32403254
1432.00 35.76 350.54 1302.95 1380.75 261.15 283.40 263.06 262.91 8.69 6.31 5978560.40 583244.22 N 70.35139410 W 149.32411230
1526.04 40.81 352.28 1376.74 1454.54 319.28 341.64 320.51 320.51 0.04 5.49 5978617.89 583234.93 N 70.35155145 W 149.32418252
1619.71 47.75 354.69 1443.77 1521.57 384.61 407.00 385.51 385.44 -7.29 7.62 5978682.73 583226.88 N 70.35172884 W 149.32424203
1718.76 49.59 355.40 1509.18 1586.98 458.99 481.37 -;:4)59.74 459.54 -13.71 1.93 5978756.75 583219.64 N 70.35193127 W 149.32429413
1812.17 54.48 354.18 1566.63 1644.43 532.60 554.99 533.24 532.85 -20.42 5.34 5978829.97 583212.11 N 70.35213155 W 149.32434862
1906.71 57.31 353.97 1619.63 1697.43 610.87 633.26 611.37 610.71 -28.50 3.00 5978907.72 583203.17 N 70.35234424 W 149.32441423
2001.62 58.21 354.05 1670.26 1748.06 691.13 713.54 691.53 690.54 -36.88 0.95 5978987.46 583193.91 N 70.35256235 W 149.32448225
2096.34 60.36 354.89 1718.64 1796.44 772.55 794.97 772.89 771.59 -44.72 2.39 5979068.40 583185.17 N 70.35278377 W 149.32454590
2190.19 63.62 355.24 1762.71 1840.51 855.40 877.81 855.70 854.13 -51.84 3.49 5979150.85 583177.13 N 70.35300925 W 149.32460374
2285.89 66.04 354.90 1803.41 1881.21 942.00 964.42 942.28 940.42 -59.29 2.55 5979237.04 583168.73 N 70.35324498 W 149.32466419
SurveyEditor Ver Bld( doc40x_37 )
L-212\L-212\L-212PB2\L-212PB2
Generated 5/12/2005 7:51 AM Page 1 of 5
Comments Latitude Longitude
N 70.35347968 W 149.32472933
N 70.35371194 W 149.32479599
2569.17 65.24 354.36 1922.95 2000.75 1198.80 1221.23 1198.98 1196.05 -83.75 1.08 5979492.37 583141.43 N 70.35394336 W 149.32486283
2664.41 64.32 354.22 1963.53 2041.33 1284.96 1307.39 1285.11 1281.79 -92.32 0.98 5979577.99 583131.90 N 70.35417758 W 149.32493244
2759.30 65.45 353.55 2003.81 2081.61 1370.86 1393.30 1370.98 1367.22 -101.48 1.35 5979663.31 583121.80 N 70.35441096 W 149.32500678
2853.30 64.69 353.78 2043.43 2121.23 1456.08 1478.54 1456.16 1451.94 -110.88 0.84 5979747.91 583111.46 N 70.35464240 W 149.32508316
2949.72 65.80 353.81 2083.80 2161.60 1543.61 1566.10 1543.68 1538.98 -120.35 1.15 5979834.83 583101.03 N 70.35488020 W 149.32516001
3045.89 64.60 353.95 2124.14 2201.94 1630.90 1653.40 1630.94 1625.78 -129.65 1.25 5979921.52 583090.76 N 70.35511734 W 149.32523560
3141.51 64.82 353.18 2164.99 2242.79 1717.32 1739.86 1717.36 1711.69 -139.34 0.76 5980007.31 583080.12 N 70.35535203 W 149.32531430
3238.62 65.32 354.12 2205.92 2283.72 1805.36 1827.92 1805.38 1799.21 -149.08 1.02 5980094.71 583069.41 N 70.35559113 W 149.32539338
3334.04 65.52 353.52 2245.62 2323.42 1892.11 1914.69 1892.13 1885.48 -158.42 0.61 5980180.86 583059.11 N 70.35582681 W 149.3.5
3428.32 65.21 353.32 2284.92 2362.72 1977.78 2000.39 1977.78 1970.62 -168.24 0.38 5980265.87 583048.34 N 70.35605938 W 149.3 1
3521.47 64.85 353.11 2324.24 2402.04 2062.18 2084.83 2062.18 2054.47 -178.22 0.44 5980349.60 583037.44 N 70.35628846 W 149.32563003
3613.35 64.23 352.93 2363.74 2441.54 2145.09 2167.79 2145.09 2136.81 -188.30 0.70 5980431.81 583026.44 N 70.35651341 W 149.32571191
3708.01 64.59 354.99 2404.62 2482.42 2230.44 2253.16 2230.44 2221.70 -197.28 2.00 5980516.60 583016.52 N 70.35674533 W 149.32578485
3802.85 63.97 354.38 2445.78 2523.58 2315.88 2338.61 2315.89 2306.78 -205.20 0.87 5980601.57 583007.67 N 70.35697775 W 149.32584913
3895.94 63.55 354.58 2486.94 2564.74 2399.38 2422.10 2399.38 2389.89 -213.23 0.49 5980684.58 582998.71 N 70.35720479 W 149.32591437
3984.97 63.39 353.94 2526.71 2604.51 2479.03 2501.76 2479.03 2469.14 -221.19 0.67 5980763.73 582989.87 N 70.35742131 W 149.32597908
4075.00 63.29 356.14 2567.11 2644.91 2559.48 2582.21 2559.48 2549.29 -228.15 2.19 5980843.79 582982.02 N 70.35764027 W 149.32603560
4155.13 64.03 355.26 2602.66 2680.46 2631.28 2654.02 2631.28 2620.90 -233.54 1.35 5980915.33 582975.84 N 70.35783590 W 149.32607935
4249.58 70.26 354.96 2639.33 2717.13 2718.27 2741.02 2718.28 2707.58 -240.96 6.60 5981001.91 582967.46 N 70.35807268 W 149.32613964
4340.42 75.96 355.79 2665.71 2743.51 2805.16 2827.90 2805.16 2794.18 -247.95 6.34 5981088.42 582959.50 N 70.35830927 W 149.32619648
4438.06 76.15 356.11 2689.24 2767.04 2899.90 2922.66 2899.91 2888.70 -254.65 0.37 5981182.86 582951.76 N 70.35856751 W 149.32625085
4533.05 76.38 355.99 2711.79 2789.59 2992.16 3014.94 2992.16 2980.76 -261.00 0.27 5981274.82 582944.38 N 70.35881899 W 149.32630250
4628.69 76.34 356.38 2734.35 2812.15 3085.09 3107.88 3085.09 3073.49 -267.19 0.40 5981367.48 582937.17 N 70.35907234 W 149.32635275
4723.58 77.67 355.76 2755.69 2833.49 3177.53 3200.34 3177.53 3165.73 -273.52 1.54 5981459.63 582929.81 N 70.35932433 W 149.32640425
4820.17 76.78 355.90 2777.04 2854.84 3271.71 3294.54 3271.72 3259.68 -280.37 0.93 5981553.49 582921.91 N 70.35958099 W 149.32645991
4915.75 77.83 354.80 2798.05 2875.85 3364.95 3387.78 3364.96 3352.62 -287.93 1.57 5981646.33 582913.32 N 70.35983487 W 149..35
5009.84 78.19 355.96 2817.60 2895.40 3456.99 3479.81 3456.99 3444.35 -295.35 1.27 5981737.97 582904.89 N 70.36008548 W 149. 58
5104.42 77.68 355.87 2837.36 2915.16 3549.47 3572.31 3549.47 3536.61 -301.94 0.55 5981830.13 582897.28 N 70.36033752 W 149.3 12
5198.23 75.83 356.14 2858.86 2936.66 3640.76 3663.62 3640.77 3627.70 -308.30 1.99 5981921.14 582889.91 N 70.36058636 W 149.32668682
5293.12 75.63 356.07 2882.25 2960.05 3732.71 3755.58 3732.72 3719.45 -314.55 0.22 5982012.80 582882.64 N 70.36083701 W 149.32673759
5387.41 75.71 353.90 2905.59 2983.39 3824.06 3846.93 3824.07 3810.45 -322.53 2.23 5982103.70 582873.65 N 70.36108562 W 149.32680248
5481 .46 75.58 352.60 2928.91 3006.71 3915.13 3938.05 3915.13 3900.93 -333.24 1.35 5982194.05 582861.93 N 70.36133280 W 149.32688949
5576.19 75.35 351.49 2952.68 3030.48 4006.70 4029.74 4006.70 3991.74 -345.93 1.16 5982284.71 582848.24 N 70.36158089 W 149.32699260
5670.68 76.93 348.88 2975.32 3053.12 4098.10 4121.48 4098.11 4082.12 -361.57 3.16 5982374.90 582831.59 N 70.36182781 W 149.32711970
5763.87 78.54 349.23 2995.11 3072.91 4188.67 4212.54 4188.70 4171.53 -378.86 1.77 5982464.10 582813.31 N 70.36207205 W 149.32726016
5858.80 77.80 349.97 3014.58 3092.38 4281.17 4305.45 4281.23 4262.91 -395.63 1.09 5982555.28 582795.53 N 70.36232170 W 149.32739644
5953.35 76.83 350.22 3035.34 3113.14 4373.08 4397.69 4373.18 4353.78 -411.50 1.06 5982645.96 582778.65 N 70.36256994 W 149.32752536
6047.68 78.53 349.79 3055.46 3133.26 4464.88 4489.85 4465.05 4444.54 -427.50 1.86 5982736.52 582761.65 N 70.36281787 W 149.32765533
6142.06 77 .46 349.85 3075.10 3152.90 4556.82 4582.16 4557.06 4535.40 -443.81 1.14 5982827.19 582744.33 N 70.36306609 W 149.32778791
SurveyEditor Ver Bld( doc40x_37 )
L-212\L-212\L-212PB2\L-212PB2
Generated 5/12/2005 7:51 AM Page 2 of 5
Comments Latitude Longitude
N 70.36331623 W 149.32792518
6332.48 77.45 348.96 3119.01 3196.81 4741.19 4767.44 4741.64 4717.47 -478.14 1.68 5983008.85 582707.99 N 70.36356349 W 149.32806682
6427.82 78.07 349.58 3139.22 3217.02 4833.90 4860.62 4834.47 4809.01 -495.48 0.91 5983100.19 582689.63 N 70.36381357 W 149.32820777
6523.28 78.27 349.82 3158.79 3236.59 4926.93 4954.05 4927.63 4900.94 -512.19 0.32 5983191.92 582671.90 N 70.36406471 W 149.32834353
6618.74 78.67 350.54 3177.87 3255.67 5020.13 5047.58 5020.96 4993.10 -528.14 0.85 5983283.89 582654.93 N 70.36431648 W 149.32847317
6714.42 78.24 350.18 3197.02 3274.82 5113.57 5141.33 5114.52 5085.52 -543.84 0.58 5983376.12 582638.21 N 70.36456896 W 149.32860074
6810.24 78.12 349.51 3216.65 3294.45 5206.98 5235.12 5208.08 5177.84 -560.38 0.70 5983468.24 582620.65 N 70.36482116 W 149.32873513
6905.05 77 .40 350.49 3236.75 3314.55 5299.28 5327.77 5300.52 5269.08 -576.47 1.26 5983559.29 582603.55 N 70.36507043 W 149.32886589
7000.75 77.95 350.64 3257.17 3334.97 5392.49 5421.26 5393.88 5361.31 -591.79 0.59 5983651.34 582587.20 N 70.36532239 W 149.32899046
7093.86 78.76 350.66 3275.97 3353.77 5483.42 5512.46 5484.94 5451.30 -606.61 0.87 5983741.14 582571.39 N 70.36556821 W 149.32911088
7187.47 79.26 350.71 3293.81 3371.61 5575.05 5604.35 5576.71 5541.98 -621.48 0.54 5983831.64 582555.51 N 70.36581594 W 149.3.7
7281.46 78.50 349.84 3311.94 3389.74 5666.96 5696.57 5668.79 5632.87 -637.06 1.22 5983922.35 582538.93 N 70.36606426 W 149.329 39
7375.65 78.15 350.49 3331.00 3408.80 5758.88 5788.81 5760.87 5723.76 -652.81 0.77 5984013.05 582522.16 N 70.36631255 W 149.32948646
7467.81 77.95 350.15 3350.08 3427.88 5848.74 5878.98 5850.89 5812.64 -667.98 0.42 5984101.74 582506.02 N 70.36655535 W 149.32960969
7560.40 77.83 350.38 3369.51 3447.31 5938.96 5969.51 5941 .29 5901.86 -683.28 0.28 5984190.79 582489.72 N 70.36679910 W 149.32973412
7654.73 77.90 350.57 3389.34 3467.14 6030.89 6061.73 6033.39 5992.82 -698.54 0.21 5984281.55 582473.45 N 70.36704757 W 149.32985817
7749.56 77.51 350.11 3409.53 3487.33 6123.24 6154.38 6125.92 6084.16 -714.09 0.63 5984372.71 582456.89 N 70.36729710 W 149.32998456
7844.71 77.57 349.86 3430.06 3507.86 6215.79 6247.29 6218.67 6175.65 -730.25 0.26 5984464.01 582439.72 N 70.36754704 W 149.33011590
7938.57 80.54 350.69 3447.88 3525.68 6307.62 6339.43 6310.69 6266.47 -745.81 3.28 5984554.64 582423.15 N 70.36779515 W 149.33024241
8033.06 82.50 351.48 3461.81 3539.61 6400.86 6432.89 6404.08 6358.79 -760.29 2.23 5984646.78 582407.65 N 70.36804736 W 149.33036013
8127.59 80.07 350.56 3476.14 3553.94 6494.06 6526.32 6497.45 6451.08 -774.87 2.74 5984738.89 582392.05 N 70.36829947 W 149.33047868
8220.79 80.60 350.99 3491.78 3569.58 6585.69 6618.20 6589.24 6541.76 -789.60 0.73 5984829.40 582376.31 N 70.36854722 W 149.33059843
8314.56 76.33 348.84 3510.53 3588.33 6677.18 6710.05 6680.95 6632.20 -805.67 5.08 5984919.64 582359.24 N 70.36879426 W 149.33072908
8410.54 76.50 349.24 3533.08 3610.88 6769.97 6803.34 6774.02 6723.79 -823.41 0.44 5985011.03 582340.49 N 70.36904448 W 149.33087329
8517.32 77.19 349.04 3557.38 3635.18 6873.40 6907.32 6877.76 6825.90 -843.00 0.67 5985112.91 582319.77 N 70.36932345 W 149.33103256
8610.76 77.95 348.77 3577.49 3655.29 6964.13 6998.57 6968.79 6915.45 -860.56 0.86 5985202.24 582301.21 N 70.36956806 W 149.33117533
8703.78 77.61 349.59 3597.18 3674.98 7054.58 7089.48 7059.51 7004.74 -877.63 0.94 5985291.33 582283.16 N 70.36981200 W 149.33131409
8798.71 76.91 349.83 3618.11 3695.91 7146.78 7182.08 7151.96 7095.85 -894.17 0.78 5985382.24 582265.61 N 70.37006088 W 149'1157
8893.67 76.66 349.73 3639.82 3717.62 7238.84 7274.52 7244.28 7186.82 -910.57 0.28 5985473.02 582248.20 N 70.37030942 W 149. 94
8988.33 76.74 350.08 3661.60 3739.40 7330.59 7366.64 7336.29 7277.52 -926.71 0.37 5985563.52 582231.05 N 70.37055719 W 149.3 24
9083.23 76.52 350.30 3683.54 3761.34 7422.60 7458.97 7428.52 7368.50 -942.45 0.32 5985654.31 582214.31 N 70.37080572 W 149.33184117
9178.00 76.95 349.46 3705.29 3783.09 7514.47 7551.21 7520.65 7459.30 -958.65 0.97 5985744.92 582197.09 N 70.37105379 W 149.33197297
9274.00 77.31 349.20 3726.67 3804.47 7607.60 7644.80 7614.08 7551.27 -975.98 0.46 5985836.68 582178.75 N 70.37130503 W 149.33211388
9367.83 76.74 348.90 3747.74 3825.54 7698.54 7736.23 7705.34 7641.04 -993.35 0.68 5985926.25 582160.38 N 70.37155027 W 149.33225511
9461.80 76.54 348.81 3769.45 3847.25 7789.44 7827.66 7796.57 7730.74 -1011.02 0.23 5986015.74 582141.72 N 70.37179532 W 149.33239881
9555.81 76.67 348.46 3791.23 3869.03 7880.33 7919.11 7887.81 7820.40 -1029.04 0.39 5986105.18 582122.70 N 70.37204025 W 149.33254536
9650.49 77.31 349.19 3812.55 3890.35 7972.04 8011.36 7979.88 7910.90 -1046.92 1.01 5986195.47 582103.82 N 70.37228749 W 149.33269075
9743.78 77.44 349.39 3832.94 3910.74 8062.63 8102.40 8070.77 8000.35 -1063.84 0.25 5986284.72 582085.92 N 70.37253184 W 149.33282834
9838.04 78.01 349.90 3852.98 3930.78 8154.33 8194.50 8162.77 8090.96 -1080.39 0.80 5986375.12 582068.36 N 70.37277936 W 149.33296298
9932.04 78.97 350.72 3871.73 3949.53 8246.13 8286.61 8254.82 8181.75 -1095.90 1.33 5986465.73 582051.85 N 70.37302739 W 149.33308907
10023.90 79.23 350.69 3889.10 3966.90 8336.08 8376.81 8344.98 8270.77 -1110.47 0.28 5986554.57 582036.29 N 70.37327058 W 149.33320758
SurveyEditor Ver Sld( doc40x_37 )
L-212\L-212\L-212PS2\L-212PS2
Generated 5/12/2005 7:51 AM Page 3 of 5
Comments Latitude Longitude
10119.24 79.44 351.31 3906.75 3984.55 8429.54 8470.50 8438.65 8363.31 -1125.12 0.68 5986646.94 582020.61 N 70.37352338 W 149.33332681
10213.66 79.59 350.98 3923.93 4001.73 8522.18 8563.35 8531.47 8455.04 -1139.41 0.38 5986738.50 582005.30 N 70.37377399 W 149.33344307
10308.96 79.60 351 .44 3941.14 4018.94 8615.70 8657.08 8625.19 8547.67 -1153.74 0.47 5986830.96 581989.95 N 70.37402704 W 149.33355960
10402.07 79.80 351.46 3957.79 4035.59 8707.14 8748.69 8716.79 8638.27 -1167.36 0.22 5986921.38 581975.33 N 70.37427452 W 149.33367040
10497.65 79.09 352.08 3975.30 4053.10 8800.95 8842.65 8810.74 8731.26 -1180.81 0.98 5987014.21 581960.85 N 70.37452857 W 149.33377984
10593.03 77.13 351.39 3994.95 4072.75 8894.13 8935.98 8904.07 8823.62 -1194.22 2.17 5987106.41 581946.41 N 70.37478088 W 149.33388899
1 0688.40 72.91 348.24 4019.60 4097.40 8985.85 9028.09 8996.08 8914.27 -1210.48 5.45 5987196.86 581929.14 N 70.37502851 W 149.33402126
10782.92 71.41 347.98 4048.56 4126.36 9075.17 9118.06 9085.82 9002.31 -1229.02 1.61 5987284.69 581909.63 N 70.37526903 W 149.33417204
10878.44 69.52 347.38 4080.50 4158.30 9164.45 9208.08 9175.55 9090.25 -1248.22 2.07 5987372.40 581889.45 N 70.37550928 W 149.33432825
10974.11 66.57 346.50 4116.26 4194.06 9252.30 9296.80 9263.91 9176.68 -1268.26 3.20 5987458.60 581868.46 N 70.37574538 W 149.33449126
11068.60 63.63 344.91 4156.04 4233.84 9336.87 9382.50 9349.07 9259.73 -1289.41 3.47 5987541.39 581846.39 N 70.37597223 W 149.3.4
11163.04 59.89 344.29 4200.72 4278.52 9418.69 9465.68 9431.55 9339.93 -1311.49 4.00 5987621.33 581823.42 N 70.37619132 W 149.33 85
11257.62 55.57 343.19 4251.21 4329.01 9497.10 9545.63 9510.68 9416.68 -1333.86 4.67 5987697.83 581800.20 N 70.37640100 W 149.33502477
11352.75 50.79 340.61 4308.21 4386.01 9571.25 9621.76 9585.66 9489.05 -1357.46 5.47 5987769.93 581775.81 N 70.37659870 W 149.33521669
11446.73 47.27 338.07 4369.83 4447.63 9639.57 9692.70 9654.93 9555.44 -1382.45 4.26 5987836.03 581750.08 N 70.37678006 W 149.33541991
11540.40 43.29 332.73 4435.75 4513.55 9702.25 9759.22 9718.78 9615.95 -1410.03 5.87 5987896.22 581721.83 N 70.37694534 W 149.33564421
11635.21 39.06 331.78 4507.09 4584.89 9759.81 9821.63 9777.67 9671.19 -1439.06 4.51 5987951.13 581692.19 N 70.37709623 W 149.33588028
11729.99 36.09 331.45 4582.21 4660.01 9812.85 9879.42 9832.02 9722.03 -1466.53 3.14 5988001.66 581664.16 N 70.37723512 W 149.33610364
11823.14 32.96 333.14 4658.94 4736.74 9861.53 9932.20 9881.90 9768.75 -1491.10 3.51 5988048.10 581639.08 N 70.37736274 W 149.33630341
11918.56 30.68 333.19 4740.02 4817.82 9908.23 9982.51 9929.71 9813.64 -1513.81 2.39 5988092.73 581615.88 N 70.37748536 W 149.33648809
12012.78 30.14 333.09 4821.27 4899.07 9952.50 10030.20 9975.06 9856.19 -1535.36 0.58 5988135.03 581593.86 N 70.37760158 W 149.33666332
12107.70 29.57 331.68 4903.60 4981.40 9996.11 10077.45 10019.81 9898.06 -1557.25 0.95 5988176.65 581571.50 N 70.37771595 W 149.33684138
12201.50 29.02 331.69 4985.40 5063.20 10038.26 10123.35 10063.12 9938.46 -1579.02 0.59 5988216.80 581549.28 N 70.37782632 W 149.33701841
12296.86 28.51 331.30 5068.99 5146.79 10080,34 10169.24 10106.39 9978.79 -1600.92 0.57 5988256.88 581526.94 N 70.37793648 W 149.33719649
12390.99 29.27 331.60 5151.41 5229.21 10122.03 10214.71 10149.29 10018.73 -1622.66 0.82 5988296.58 581504.77 N 70.37804559 W 149.33737323
12484.82 29.73 334.03 5233.08 5310.88 10164.81 10260.91 10193.24 10059.83 -1643.75 1.37 5988337.44 581483.22 N 70.37815785 W 149.33754481
12580.27 30.06 335.51 5315.83 5393.63 10209.45 1 0308.48 10238.99 10102.86 -1664.03 0.85 5988380.24 581462.47 N 70.37827540 W 149.33770970
12676.31 30.44 335.80 5398.79 5476.59 10255.10 10356.87 10285.73 10146.94 -1683.97 0.42 5988424.09 581442.04 N 70.37839581 W 149..90
12772.58 30.99 337.74 5481.56 5559.36 10301.80 10406.03 10333.48 10192.13 -1703.36 1.18 5988469.05 581422.15 N 70.37851923 W 149. 58
12869.50 30.65 336.25 5564.79 5642.59 10349.02 10455.69 10381.77 10237.83 -1722.76 0.86 5988514.53 581402.25 N 70.37864408 W 149.3 38
12965.39 29.29 333.60 5647.86 5725.66 10394.01 10503.58 10427.92 10281.22 -1743.03 1.98 5988557.68 581381.49 N 70.37876260 W 149.33835228
13060.65 29.12 334.72 5731.01 5808.81 10437.45 10550.06 10472.56 10323.05 -1763.29 0.60 5988599.28 581360.77 N 70.37887686 W 149.33851706
13154.21 29.82 333.50 5812.47 5890.27 1 0480.45 10596.09 10516.77 1 0364.45 -1783.40 0.99 5988640.46 581340.21 N 70.37898996 W 149.33868055
13247.85 30.62 333.11 5893.38 5971.18 10524.24 10643.22 10561.86 10406.56 -1804.57 0.88 5988682.32 581318.57 N 70.37910498 W 149.33885276
13344.32 31.00 332.69 5976.24 6054.04 10570.02 10692.63 10609.06 10450.54 -1827.08 0.45 5988726.05 581295.58 N 70.37922513 W 149.33903584
13437.29 30.84 332.45 6055.99 6133.79 10614.17 10740.40 10654.62 10492.95 -1849.09 0.22 5988768.20 581273.10 N 70.37934095 W 149.33921483
13530.07 29.53 334.34 6136.19 6213.99 10657.54 10787.05 10699.32 10534.64 -1869.99 1.74 5988809.66 581251.74 N 70.37945485 W 149.33938483
13620.49 28.75 335.45 6215.17 6292.97 10698.88 10831.08 10741.85 10574.51 -1888.67 1.05 5988849.31 581232.62 N 70.37956375 W 149.33953681
13714.10 28.21 336.96 6297.45 6375.25 10741.13 10875.71 10785.22 10615.35 -1906.69 0.96 5988889.94 581214.15 N 70.37967530 W 149.33968333
13808.61 28.53 338.69 6380.61 6458.41 10784.03 10920.62 10829.15 10656.93 -1923.63 0.93 5988931.33 581196.75 N 70.37978889 W 149.33982118
SurveyEditor Ver Sld( doc40x_37 )
L-212\L-212\L-212PS2\L-212PS2
Generated 5/12/2005 7:51 AM Page 4 of 5
Comments Measured Inclination Azimuth Sub·Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
(ft1 (dea) (dea 1 (ft) (ft) (ft) (ft1 ( It) Ift1 (ft) (deg/100 ft) (ftUS) (ftUS)
13903.67 30.08 338.33 6463.50 6541 .30 10828.64 10967.14 10874.79 10700.22 -1940.68 1.64 5988974.43 581179.22 N 70.37990714 W 149.33995986
13997.01 29.91 337.62 6544.34 6622.14 10873.26 11013.81 1 0920.48 10743.48 -1958.18 0.42 5989017.48 581161.25 N 70.38002530 W 149.34010220
14091.89 29.97 336.59 6626.56 6704.36 10918.32 11061.16 10966.70 10787.10 -1976.60 0.55 5989060.89 581142.34 N 70.38014446 W 149.34025207
14186.40 29.34 336.59 6708.69 6786.49 10962.69 11107.92 11012.26 10830.01 -1995.18 0.67 5989103.59 581123.29 N 70.38026168 W 149.34040320
Last MWD+IFR+MS 14281.82 27.72 336.24 6792.52 6870.32 11005.89 11153.49 11056.65 10871.78 -2013.41 1.71 5989145.15 581104.60 N 70.38037577 W 149.34055150
TO ( Projected) 14338.00 27.72 336.24 6842.25 6920.05 11030.63 11179.62 11082.08 10895.70 -2023.94 0.00 5989168.95 581093.81 N 70.38044110 W 149.34063715
Leqal Description:
Northinq (y) rftUSl Eastinq (X) rftUSl
Surface: 2575 FSL 3676 FEL S34 T12N R11 E UM 5978297.43 583238.45
BHL: 2911 FSL 399 FEL S21 T12N R11 E UM 5989168.95 581093.81
.
.
SurveyEditor Ver Bld( doc40x_37 )
L-212\L-212\L-212PB2\L-212PB2
Generated 5/12/2005 7:51 AM Page 5 of 5
L-212i 9ES As Built Completion
FROM DRlG ~ DRAFT
Cellar Elevation = 49.3'
Nabors 9ES RKB = 77.8'
TREE: FMC 4-1/16" 5M
WELLHEAD: FMC Gen 5 System
11", 5M csg.head wi 7" mandrel hanger & packoff
11" x 11", 5M, tbg spool w/
11" x 4-1/2" tubing hanger
11" X 4-1/16" Adaptor Flange
20" X 34" 215.5Ib/ft, A53 ERW Insulated 108'
4-1/2" 'X' Landing Nipple with 3.813" seal bore -
3792'
DATE
04/19/05
9-5/8",40 #/it, L-80, BTC
14055'
DATE
04/19/05
04/19/05
04/19/05
04/19/05
7" Short Joint & RA Tag 6963'-
4-1/2" X 3-1/2" TCII XO -7944'
4-1/2" 'X' Landing Nipple with 3.813" seal bore -7821'
7" Short Joint & RA Tag 7851.5'-
7" x 3-1/2" Baker 'PRM' Production Packer - 7884'
RA Tag in 3-1/2" 8001'
4-1/2", 12.6Ib/ft, L-80, TCII
Drift 110: 3.833"/3.958"
3-1/2", 9.3 Ib/ft, L-80, TCII
Drift 110: 2.867"/2.992"
OBa Perfs: 8050' - 8116'
3-1/2" 'X' Landing Nipple with 2.813" seal bore - 8122'
7" x 3-1/2" Baker 'PRM' Production Packer - 8143'
OBb Perfs: 8156' - 8182'
3-1/2" 'X' Landing Nipple with 2.813" seal bore - 8329'
7" x 3-1/2" Baker 'PRM' Production Packer - 8349'
3-1/2" 'X' Landing Nipple with 2.813" seal bore - 8406' & 8426'
3-1/2" WireLine Entry Guide - 8448'
Bd Perfs: 8~- 8516'
7", PBTD I 8748' MD
7",26 #Ift, L80, BTC-Mod I 8832' MD
83/4", TD (Injector
Mainbore)
Date
02/25/05
04/19/05
04/26/05
Rev By
Mik Triolo
N9ES
/TLH
Comments
Proposed Com letion
As Built Completion
GL V BOX ADDED
WELL: L-212i
API NO: 50-029-23252
(
.
1fŒ (DJ~ ~~
.
(êù
~\\
(Q;
!Æ
FRANK H. MURKOWSKI, GOVERNOR
AI~SIiA OIL AlQ) GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay L-212i
BP Exploration (Alaska) Inc.
Permit No: 205-030
Surface Location: 2575' NSL, 3676' WEL, SEC. 34, T12N, RIlE, UM
Bottomhole Location: 3911' NSL, 3066' WEL, SEC. 27, T12N, RIlE, UM
Dear Mr. Crane:
Enclosed is the approved application for permit to drill the above referenced service well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
. reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit Please provide at least twenty-four (24)
hours notice for a representative of the Commission t itness any required test Contact the
Commission's petroleum field inspector at (907) 659 6 (pager).
DATED this~g day of February, 2005
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
...
. I
STATE OF ALASKA
ALASKIIL AND GAS CONSERVATION C ,MISSION
PERMIT TO DRILL
20 AAC 25 005
WGA- -z./u;; lU'o)'
,
1a. Type of work 11/ Drill o Redrill rb. Current Well Class o EXPlorat07 0 Development qil. B,M.UUiPle Zone
ORe-Entry o Stratigraphic Test 11/ Service 0 Development Gas> ·Single Zone
2. Operator Name: 5. Bond: 0 Blanket o Single Well 11. Well Name and Number:
BP Exploration (Alaska) Inc. Bond No. 2S100302630-277 PBU L-212i
3. Address: 6. Proposed Depth: 12. Field I Pool(s):
P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 8803 TVD 4768 Prudhoe Bay Field 1 Orion
4a. Location of Well (Governmental Section): 7. Property Designation: Schrader Bluff
Surface: ADL 028239
2575' NSL, 3676' WEL, SEC. 34, T12N, R11 E, UM 8. Land Use Permit: 13. Approximate Spud Date:
Top of Productive Horizon:
3334' NSL, 3296' WEL, SEC. 27, T12N, R11E, UM 03/03/05
Total Depth: 9. Acres in Property: 14. Distance to Nearest Property:
3911' NSL, 3066' WEL. SEC. 27, T12N, R11E, UM 2560 3680'
4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool
Surface: X-583238 y-5978297 Zone- ASP4 (Height above GL): 77.80 feet 715' away from L-200 ./
16. Deviated Wells: Kickoff Depth: 4161 feet 17. Maximum Anticipated Pressures in psig (see 20 MC 25.035)
Maximum Hole Angle: 65 deorees Downhole: 3420 Surface: 2760 /
18. Casing Program: Specifications Setting Depth Qu~ntity ofce~ent
Size Top Bottom i(c.f.orsacks
Hole Casina Weiaht Grade CouolinQ LenQth MD TVD MD TVD (includina staae data)
42" 20" x 34" 215.5# A53 Welded 80' 28' 28' 108' 108' 60 sxArctic Set (ADDroX.)
12-1/4" 9-518" 40# L-80 BTC 3900' 28' 28' 3928' 2613' 06 sx Arcticset Lite, -6+5' sx 'G'
8-3/4" 7" 26# L-80 BTC-M 8775' 28' 28' 8803' 4768' 99 sx Class 'G' He \lJ6A-
19. PRESENTWELL CONDITION SUMMARY (To be completed for Redrill AND Re-entryOperatiòns)
Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1 Junk (measurèd):
Casing Length Size Cement Volume MD TVD
Connuctor
-
Pr _L .>¡ n
I ¡nAr
Perforation Depth MD (ft): IperfOration Depth TVD (ft):
20. Attachments !HI Filing Fee, $100 o BOP Sketch !HI Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis
!HI Property Plat o Diverter Sketch o Seabed Report !HI Drilling Fluid Program !HI 20 MC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify th~~~e foregoing is true and correct to the best of my knowledge. Contact Michael Triolo, 564-5774
Printed Name Lo II Crane Title Senior Drilling Engineer
iJ íc!4 ~ Prepared By Name/Number.
SignatuÇé """"C'" ....--- 1?A Phone S- (;, <{ /' <-c. c>X'7' Date ;2-;)2-0)"" Sondra Stewman, 564-4750
! / Commission Use Only
Permit To t;)Fi/I" I API Number: I Permit Approv21 V- I ~ee cover letter for
Number:.:2.o ¿;.... ð. ~ r; 50- 0.2.. 9 - .2. ..3 .2.. 5' 2- Date: P/Y/ other requirements
Conditions of Approval: Samples Required [J Yes [J No Mud Log Requirea [J Yes [J No
f!1 Sud",e Measures [J Yes [J No Directional Survey Required !Yes LJ No
OIhe,J.¿~E f~ 1000 f'" flLLT1 e-e b~( e....-{.. t ~ u&..1; -h¡ to 1 y..l e:ú ~ "-€ J '
Date ~ ð5'
ADorovedB~ I~ o RIG I N A l APPROVED BY
:J THE COMMISSION
Form 10-401 ~ed o~~ fUbmfln Duplicate
Greater p.10e Bay Orion L-212i Permit
.
, Well Plan SUmmary
I Type of Well (producer or injector):
I USH Injector
Surface Location: 2,575' FSL, 3,676' FEL, Sec. 34, T12N, R11 E ./
X - ¡:;Q() 7A¡:; Y - ¡:; Q(';Q Q(,;A
:;:,"*
L-212i Top Kuparuk Target (Pilot Hole): 2,741' FSL, 325' FEL, Sec. 21, T12N, R11 E
X = 581,170 Y = 5,989,000 Z = 6,550' TVDss
L-212i Kuparuk BHL (Pilot Hole): 2,883' FSL, 385' FEL, Sec. 21, T12N, R11 E
X=581,107.59 Y=5,989,141.23 Z=6,816'TVDss
L-212i Schrader Target 1: 3,334' FSL, 3,296' FEL, Sec. 27, T12N, R11 E
X = 583,540 Y = 5,984,340 Z = 4,305' TVDss
L-212i Schrader BHL: 3,911' FSL, 3,066' FEL, Sec. 27, T12N, R11 E /'
X = 583,761.83 Y = 5,984,919.01 Z = 4,690' TVDss
I Rig: I Nabors 9ES ./
I Operating days to complete: 123.4
~ 77.80'
I AFE Number:
I Estimated Start Date: I March 3m 2005
Pilot MD 14,263' (Pilot)
Inj KOP 4,161'
Inj MD 8,803'
TVDrkb: TD 6,894'
TVDrkb: KOP 2,712'
TVDrkb: TD 4,768'
Max Inc. 78°
Inc. 64°
Max Inc. 65°
Well DesiQn: USH Grassroots Schrader Injector with Schrader and Kuparuk appraisal pilot hole.
The 0 sands will have a 4-%" X 3-%" TCII Completion in the Schrader Bluff
Estimated Reserves: 1.135 MMBO
Current Well Information
L-212i Mainbore:
Distance to Nearest Property: -3,680' at top OA to the nearest PBU property line
Distance to Nearest Well in Pool: 7151 to L-200 at top Na: 1,0501 to L-200 at top OBa perf depth
API Number:
Well Type:
Current Status:
BHP (PB1):
BHP (Mainbore):
BHT:
50-029- ??17?
Development - Orion Schrader Injector
New well, 20" X 34" insulated conductor
3,420 psi @ 6,600' TVDss (10.0 ppg EMW). Virgin pressure gradient.
1,960 psi @ 4,280' TVDss (8.8 ppg EMW). Virgin pressure gradient.
95°F @ 4,280' TVDss estimated (from L-pad Temp Log)
Mechanical Condition
L-212i:
Nabors 9ES:
Conductor:
Cellar Box above MSL = 49.3'
KB I MSL = 28.5'
20" X 34", 215.5 Ibltt, A53 ERW set at 114' RKB
% Mile Well bore Near Wellbore Mechanical Integrity Summary:
2-0 +-00/
L-200 is within % mile of this injector at its penetration at the Top OA structure. L-200 is approximately 715' away at its
closest point to L-212i. L-212i is one of the planned injectors for L-200. No other near wellbore integrity issues. /
Final
, Materials Needed
Surface Casing:
Intermediate Casing:
L-80 Completion:
.
Greater pwoe Bay Orion L-212i Permit
3,930'
1 each
1 each
25 each
1 assembly
1 lot
9-%", 40#, L-80 BTC Casing
9-%", BTC Float Shoe and Float Collar
9-%",40#, BTC Type TAM Port Collar
9-%" x 12 1,.4" Bow Spring Centralizers
FMC 11" 5m Gen 5 Wellhead System
9-%" casing pups 5', 10', 20'.
8,810'
1 each
80 each
2 lots
2 each
2 each
7" 26# L-80 BTC-M Casing
7" BTC-M Float Shoe and Float Collar
7" x 8 %" Rigid Straight Blade Centralizers
7" casing pups 5', 10', 20'
7" RA Tag
7" 26# L-80 BTC-M Casing Short Joint
7,800'
500'
3 each
2 each
4 each
1 each
1 each
1 each
4 each
1 each
4 W' 12.60 I blft , L-80, TCII tubing
3 W' 9.30 Ib/tt, L-80, TCII tubing
Baker PRM Production Packer 7" X 3-%"
Halliburton 4-W' X-Nipple (3.813" ID)
Halliburton 3-%" X-Nipple (2.813" ID)
11" X 4-%" FMC tubing hanger
4-1/16", 5m Cameron Tree
4-%" x 1" KBG-2 GLM
3-W' x 1-W' MMG injection mandrels
3 W' RA Tag
Surface and Anti-Collision Issues
Surface Shut-in Wells:
NcarbyWeUs L-202 :L-spare L-203 1.-200
Distance to Target Well 15.23 14.62 29.96 30.18
Rig N9ES Wellhead Separation -14.77 -15.38 -0.04 5.18
Separation of the target wellhead from nearest well is 14.62'. Surface close approach limit for Nabors 9ES is 30'
separation from rig well center to wellhead. Smallest rig to wellhead separation is therefore -14.77'. L-202 and the L-
Spare have not been drilled and therefore will not require surface shut-in and wellhouse removal in order to
move over well. L-200 should be evaluated before rig move as to whether it will require well house removal and shut in
for rig move.
Close Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation for this profile.
/'
Close Approach Well List:
249.40-ft
299.08-tt
350.04-tt
549.61-tt
1,133.36-tt
Use Travelin
Use Travelin
Use Travelin
Use Travelin
Use Travelin
2
Greater Pwoe Bay Orion L-212i Permit
.
, Survey and Logging Program
12-%" Hole Section: Surface Gyro may be needed (run as conditions dictate)
Open Hole: MWD / GR
Cased hole: None
8-3;4" Pilot Hole Section:
Open Hole: MWD / GR / Res / Den / Neu / Sonic / PWD (Den/Neu/Sonic recorded only)
Cased Hole: N/A
*
8-3;4" Hole Section:
Open Hole: MWD / GR / Res / Den / Neu / PWD (Den Neu recorded only)
Cased Hole: USIT Bond Log
Mud Program:
12%" Surface Hole Mud Properties: Spud - Freshwater Mud ..
Interval Densitv (ppq) Funnel vis YP PH FL
Initial 8.5- 9.2 250-300 50-70 8.5-9.0 NC-8.0
Base Perm 9.0- 9.5 200-250 30-45 8.5-9.0 8.0
Interval TO 9.6 (max) 200-250 30-40 8.5-9.0 5.0-7.0
8 3;4" Int. Hole Mud Properties: Freshwater Mud (LSNO) PH: 9.0-9.5 <600 Chlorides
Interval Densitv (ppq) YP PV API Filtrate MBT
KOP to TO 9.0- 9.3 23-30 12-18 I 4-6 <20
83;4" Pilot Hole Mud Properties: Freshwater Mud (LSNO) PH: 9.0-9.5 <600 Chlorides
Interval Densit\i (ppq) YP PV API Filtrate MBT
Shoe to TOD HRZ 9.0/' '§)3 23-30 12-18 4-6 < 20
Top HRZ to TO ;f0.7 25 18 3-5 <20
~..
Formation Markers (Based on Schlumberger WP4/P6)
G1 255 333 333 117 8.8 No 9. ~
SV6 890 976 968 409 8.8 No
Fault #1 1,380 1,526 1 ,458 N/A N/A N/A
SV5 1,480 1,657 1,558 681 8.8 No
SV4 1,605 1,838 1,683 738 8.8 Poss. Gas Hydrates
Base Permafrost 1,680 1,961 1,758 773 8.8 No
SV3 1,955 2,562 2,033 899 8.8 Poss. Gas Hydrates
SV2 2,110 2,927 2,188 971 8.8 Poss. Gas Hydrates
SV1 2,435 3,692 2,513 1,120 8.8 Poss. Gas Hydrates
or Free Gas
UG4 2,755 4,549 2,833 1,267 8.8 Thin coal
UG4A 2,795 4,737 2,873 1,286 8.8 Heavy Oil betw 2795
and 2900' SS
Fault #2 2,805 4,784 2,883 N/A N/A N/A
UG3 3,020 5,797 3,098 1,389 8.8 Thin coals
UG1 3,540 8,246 3,618 1,628 8.8 Heavy Oil betw 3735
- 3890' SS
Fault #3 3,630 8,669 3,708 N/A N/A N/A
Ma 3,890 9,894 3,968 1,789 8.8 Possible Heavy Oil
betw 3890 - 3910' SS
Mb1 3,930 10,082 4,008 1,808 8.8 Possible Heavy Oil
betw 3930 - 3975' SS
Mb2 4,005 1 0,435 4,083 1,842 8.8 Possible Heavy Oil
betw 4005 - 4035' SS
Mc 4,085 10,775 4,163 1,879 8.8 No
Na 4,155 10,966 4,233 1,911 8.8 No
Nb 4,180 11,023 4,258 1,923 8.8 No
3
Greater P oe Bav Orion L-212i Permit
Nc 4,230 11 ,128 4,308 1,946 8.8 No
OA 4,280 11 ,222 4,358 1,969 8.8 Yes
OBa 4,330 11 ,308 4,408 1,992 8.8 Yes
OBb 4,375 11 ,380 4,453 2,013 8.8 Yes
OBc 4,425 11 ,456 4,503 2,036 8.8 Yes
OBd 4,475 11 ,527 4,553 2,059 8.8 Yes
OBe 4,575 11,661 4,653 2,105 8.8 Yes
OBf 4,610 11,705 4,688 2,121 8.8 Yes
OBf Base 4,650 11,755 4,728 2,139 8.8 No
CM2 4,940 12,093 5,018 2,272 8.8 No
Fault #4 5,625 12,885 5,703 N/A N/A No
CM1 (faulted?) 5,625 12,885 5,703 N/A N/A No
Top HRZ 6,150 13,492 6,228 N/A N/A No
Top Kalubik 6,345 12,718 6,423 N/A N/A No
K1 6,405 13,787 6,483 N/A N/A No
Top Kuparuk D 6,550 13,955 6,628 3,200 9.5 No
Top Kuparuk C 6,600 14,013 6,678 3,420 10.0 Yes
Top Kuparuk C1 6,650 14,071 6,728 3,460 10.0 Yes
Top Kuparuk B/LCU 6,685 14,111 6,763 3,475 10.0 Yes
T.D. 6,816 14,263 6,894 N/A N/A
UG4 2,750 4,426 2,828 1,265 8.8 Thin coal
UG4A 2,785 4,505 2,863 1,281 8.8 Heavy Oil betw 2785
and 2900' SS
Fault #2 - Same as PB1 2,915 4,802 2,993 N/A N/A N/A
UG3 3,040 5,087 3,118 1,398 8.8 Thin coals
UG1 3,495 6,126 3,573 1,608 8.8 Heavy Oil betw 3700
- 3835' SS
Ma 3,835 6,939 3,913 1,764 8.8 Possible Heavy Oil
betw 3835 - 3875' SS
Mb1 3,870 7,023 3,948 1,780 8.8 Possible Heavy Oil
betw 3870 - 3945' SS
Mb2 3,945 7,204 4,023 1,815 8.8 Possible Heavy Oil
betw 3945 - 4000' SS
Mc 4,020 7,384 4,098 1,849 8.8 No
Na 4,070 7,505 4,148 1,872 8.8 No
Nb 4,100 7,577 4,178 1,886 8.8 No
Nc 4,145 7,686 4,223 1,907 8.8 No
OA 4,235 7,903 4,313 1,930 8.8 No
OBa 4,290 8,035 4,368 1 ,700-1 ,880 7.7-8.5* Yes
OBb 4,340 8,153 4,418 1,720-1,950 7.6-8.6* Yes
OBc 4,400 8,283 4,478 2,024 8.8 Yes
OBd 4,450 8,384 4,528 1,760-1,970 7.6-8.5* Yes
OBe 4,540 8,552 4,618 2,065 8.7 Yes
OBf 4,575 8,613 4,653 2,080 8.7 Yes
OBf Base 4,625 8,698 4,703 2,100 8.7 No
TD* 4,690 8,803 4,768 *TD is based on 250' MD below the Top OBe
(D."1-
",.-.
CasinglTubing Program
20" X 34" 28' / 28' 108' / 108'
9-%" 5,750 3,090 28' / 28' 3,928' / 2,613'
7" 7,240 5,410 28' / 28' 8,803' / 4,768' ,/
4 Y2" 8,430 7,500 28' / 28' 7,800' / 4,270'
3 %" 1 0,160 10,530 7,800' / 4,270' 8,300' / 4,486'
4
.'
Greater p.oe Bay Orion L-212i Permit
Cement Calculations
In the event that cement is not circulated to surface during the initial surface casing cement job, notify
the AOGCC of the upcoming remedial cement work for possible witness of cement to surface.
Open Hole Abandonment Plug
",.-
9-%" Casing Centralizer Placement
a) Run (25) 9-%" Bow-spring centralizers attached over the collar of each joint of casing from the casing
shoe up to 2,928' MD (1,000' MD above the shoe).
b) Run 2 Bow-spring centralizers on either side of the TAM Port Collar (contingency only).
c) This centralizer program is subject to change due to actual hole conditions.
7" String Centralizer Placement
a) Place 2 rigid straight blade centralizers back to back at the very bottom of the shoe joint. Do not run any
centralizers on the next two full joints.
b) With the exception stated above, run one centralizer per joint, floating across the entire joint up to 6,339'
MD (600' MD above Ma sand). Zonal isolation with cement is required across the Ma sands. The
centralizer program is subject to change pending modeling and hole conditions.
Bit Recommendations
8-3,4
4,161' - 8,803'
Hu hes MXC-1
Hu hes MXC-1
Hycalog DS70NPV
Or
RSS Bit TBD
Hycalog DS70NPV
18/18/18/16
18/18/18/16
6x14
Or
uivalent TFA
6x14
Int. Pilot
Hole
Injection
Mainbore
8-3,4
3,928' - 14,263'
5
.
Motors and Required Doglegs
Greater Pwoe Bay Orion L-212i Permit
3&4
500 - 600
gpm
60-120
78° Max in Pilot Hole
Drop to 30° to Hit Target
65° Tangent in Mainbore
Well Control
Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer
will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations
below, BOP equipment will be tested to 4,000 psi. Due to test pressures not exceeding 5,OOOpsi it will not be
necessary to have two sets of pipe rams instal/ed at al/ times.
BOP test frequency for L-212i will be 14 days. NO EXCEPTIONS
Diverter, BOPE and drilling fluid system schematics are on file with the AOGCC.
·
Pilot Hole Section-
Maximum anticipated BHP:
·
Maximum surface pressure:
(based on BHP and a full column of gas from TD ,
3,420 psi @ 6,600' TV'oss (10.0 ppg EMW). Kuparuk Interval
1, si @ 4,280' TVDss (8.8 ppg EMW). Schrader Interval
,76 psi @ surface
o psi/ft)
Production Section-
· Maximum anticipated BHP: 1,930 psi @ 4,235' TVDss (8.8 ppg EMW). Schrader Interval
· Maximum surface pressure: 1,506 psi @ surface
(based on BHP and a full column of gas from TD @ 0:10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
4,000 psi (the 7" casing will be tested to 4,000 psi) /'
Estimated 9.2 ppg Brine / 6.8 ppg Diesel
4,000/250 psi Rams & Valves
3,500/250 si Annular
NOTE: WSL will witness all BOP testing and will sign off on the test chart.
Disposal
· No annular injection in this well.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any
metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all
Class I waste to Pad 3 for disposal.
6
· Greater Pwoe Bay Orion L-212i Permit
DrillinQ Hazards and Continqencies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Schrader in these two fault blocks are expected to be normal pressured to slightly underpressured based on
offset well data. The Kuparuk in the pilot hole interval is expected to be normally pressured.
II. Hydrates and Shallow gas
A. Gas Hydrates are present at L-pad and have been encountered in offset wells throughout the SV4, SV3, SV2,
and SV1. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. *
Recommended practices and precautions.for drilling hydrates should be followed in the surface hole.
Occasionally hydrates are encountered below the SV1. /
III. Lost Circulation/Breathing
A. Lost circulation is unlikely within the Schrader interval.
B. We do not expect breathing on this well as we are above the more prevalent breathing shale's Le. Seabee.
IV. Kick Tolerancellntegrity Testing
A. The 9-%" casing will be cemented to surface.
B. The 7" casing will be cemented with 15.8 Ib/gal tail cement to 600' MD above the Ma sand.
C. The Kick Tolerance for the surface ca~' is 6.2 bbls with a 10.2 ppg mud, 11.9 ppg EMW LOT, and an 10 ppg
pore pressure (most likely 9.8 ppg). 51.7 bl Kick Tolerance is achievable with a12.8 ppg EMW LOT. Ifthe
LOT is less then 11.9 ppg EMW, th . e kick tolerance will be < 25 bbls and will require ADW Manager ~
Approval.
D. Integrity Testing
V. Stuck Pipe
Ä. We do not expect stuck pipe.
B. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners
moving as much as possible and run one centralizer per joint to help with standoff.
VI. Hydrogen Sulfide
A. L-Pad is not designated as an sit ,however Standard Operating Procedures for H2S precautions should be
followed at all times. Recentl 10 PB of H2S has been measured at L-Pad from all wells tested as recently as
January 2003 with hand held . eters. This is as a result of H2S being transmitted by shared gas lift gas and
not produced from L-Pad. There has been no seawater injection at L-Pad to date.
VII. Faults
1,527
4,784
8,669
12,885
1,380
2,805
3,600
5,625
90'
80'
50'
75'
West
South
North
East
+/- 150' MD
+/- 150' MD
+/- 150' MD
+/- 150' MD
CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
· Greater Pwoe Bay Orion L-212i Permit
Drill and Complete Procedure Summary
***AII pre-rig work should be charged off against the pre-drill AFE # ORD5M3555***
Pre-Rig Work:
1. The L-212i conductor has been set. See As-Built for coordinates. Weld an FMC landing ring for the FMC Gen 5
Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and simops
production.
Rig Operations: /
1. MIRU Nabors 9ES. Nipple up diverter spool and function test diverter. PU 4,500' of 5" DP as required to drill the
surface hole and stand it back in the derrick.
2. MU 12-%" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,951' MD. The actual
surface hole TD will be +/-100' TVD below the top of the SV1 sands.
3. Run and cement the 9-%", 40.0-lb/ft. surface casing back to surface. A TAM Port Collar will be run as per the Co Rep .-r...
and if run a shifting tool should be on location. /
4. ND diverter spool and NU casing / tubing head. NU BOPE and test to 4,000 psi. PU 5,000' of 4" DP and stand back
in the derrick.
5. MU 8-%" drilling assembly with MWD/GR/Res/Den/Neu(recorded)/Sonic (compress)/PWD and RIH to the float collar
picking up 4" DP. Test the 9-%" casing to 3,500 psi for 30 minutes. .
6. Drill shoe track and cleanout rathole. Circulate and condition cement contaminated mud. Displace over to new 9.0
ppg m.l,t~. Drill new formation to 20' below 9-%" shoe and perform LOT. ,.....
7. D '~h ad to within 500' MD of top HRZ and weight up the mud to 10.2 ppg and continue drilling pilot hole to TD at
4,2 ' MD, (Final TD to be determined based on OWC in Kuparuk). Condition the hole for P&A plug. POOH to LD .-r
standing back the 4"& 5" DP.
8. PU and RIH with 1,000' of 3-%" tubing cement stinger and plug catching sub on 5" and 4" DP to TD, spot 700'___
balanced 15.8 ppg Class G cement abandonment plug from TD to 13,563' MD.
9. POOH to 12,050' MD (300' below base Schrader) and circulate out drill pipe and cement. Spot 200' balance 15
FormaPlug pill from 12,050'MD to 11,850' MD (100' below base Schrader OBf sand).
10. POOH to 11,750 and circulate and condition mud. Wash down to 11,850' MD and spot 1,100' balance 15.8 ppg Class /
G cement abandonment plug from 11,850' MD to 10,750' MD.
11. POOH to 10,550' MD and circulate out drill pipe and cement. Wash down to 10,750 and spot second 1,100' balance //
15.8 ppg Class G cement abandonment plug from 10,750' MD to 9,650' MD (244' above Schrader Ma sand).
12. POOH to 3 stands above plug, circulate out drill pipe and contaminated mud, POOH laying down the 5".
13. MU 8-%" drilling assembly with MWD/GR/Res/Den/Neu(recorded)/PWD and RIH reaming and washing to top of //
cement plug. Place "sufficient weight on the plug to confirm its location and to confirm that the plug has set and a
competent plug is in place" (AOGCC).
14. POOH to 4,161' MD and lowside sidetrack the existing wellbore to continue with drilling the Schrader injection
mainbore. Drill ahead to 8,803' MD (base of OBd target plus 300'). Circulate and condition hole, make a short trip if
necessary, TOOH to run casing.
15. Run and cement the 7" production casing as required to cover all significant hydrocarbon intervals. Displace the /
casing with ±8.5 ppg heated seawater during cementing operations. Pressure test casing to 4,000 psi for 30 minutes
at plug bump. Freeze protect the 7" x 9-%" annulus.
16. RU Schlumberger, PU DPC guns and RIH w/ 165' of 4.5" Power Jet 5 spf perforation assembly w/ - 135' of spacer
pups. RIH to PBTD and circulate the well over to 9.2 ppg brine. Space out utilizing GR and RA tags in 7" casing.
Once spaced out correctly, -e.lt;~ :3pa(;;Qd g~t correctly-, confirm cement compressive strength is at least 2,000 psi.
Perforate OA, OBa, OBb, and OBd. PU to above top perf and circulate wellbore, monitor for losses. POOH, LD
perforation assembly.
17. RU Schlumberger E-line and RIH with gage ring and junk basket to recover any perf debris. Repeat until clean. Run a .
USIT/GR log. USIT will be primary depth control. :/
18. Run the 4-%" X 3-W, L-80 TCII completion with a 7" x 3-%" straddle packer assembly and injection mandrels (torque
turn connections). Run in the lockdown screws and set the packers. Test the production casing/tubing annulus and
tubing to 4,000 psi each. Shear the DCK shear valve.
19. Install FMC TWCV. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi.
20. Freeze protect the well to -2,500' TVD. Install BPV in tubing hanger. Install a VR plug in the 7"x 4-W' annulus valve
and secure the well. Assure that IAlOA are both protected with two barriers. Rig down and move off.
8
I· L-212i Pronosed Comnletion I ~REE FMC 4·1/16" 5M
I:: 1::. WELLHEADFMCGen5Sys!em
11', SM esg,head w/"l" mandr,,1 hang"r 8. packaff
11 X 11" 5M tbg 5poolw/
Cel¡..r£levation~49.3' 1'1 X 4,1 tubing hanger
Nabors 9£5 AKa ~ 77.(J11' X 4-1 f16" A daplor Flange
4-1/2" X 3-1/2" TCII XO
20" X 34' 2155 ¡bitt, A5ð ERW insulat<':d 108'
4-1/2" 'X' Landing Nipple with 3.813" seal bore. I 2,500' TVD I
9·5/$", 40 ffflt L-80. BTe
13,951'
7" Short Joint & RA Tag
Top Ma sand (6,939'j
Cameo
'Nìth
lift mandrel 4.112' )( 1" KBG2
Shear Va1ve pinned to 2,500
2 Jts. above
41/2" x-nipple
4-112" 'X' Landing Nipple with 3.813" seal bore.
7n x 4·1/2" Baker 'PRM' Production Packer
7" Short Joint & RA Tag-
40-60' Above Top OA (7,903'j
OBa sand Perfs: TBD
/
'am eo 3-111" >:: 1-112" MMG-W GLM
RA Tag In 3·112
4·'112", 1213 101ft, l.80, TCII
Drm / 10 . 3.833 "/3958"
3-1/2",9.3Ib/fl, L-BO, Tel!
DrìflllD ;::L867"12.992"
3-112" 'X' Landing Nipple with 2.813" seal bore.
7n x 3,1/2" Baker 'PRM' Production Packer
Cameo :3-111' x 1-112' MMG-W GLM
/
OBb sand Perfs: TBD
3-112" 'X' Landing Nipple with 2.813"$eal bore.
7" x 3-1/2" Baker 'PRM' Producllon Packer
3-1/2* 'X' Landing Nipple with 2.813n seal bore.
3-1/2" WiroUne Entry Guide (\I\IIthin ~'100' of the top OBd perf)
/
Bd sand Perfs: TBD
I 8 113' MD
7", PBTD '
7",26 #fft, l30, BTC-Mod I 8,803' MD
8 3/4' TD (Injector
Main bore)
Date
Rev By Com ments
G
02/10/05
Mik Triolo Proposed Completion
WELL: L-212i
API NO: 50-029-XXXXX
9
L-212PB1 (P8b)
roer
Report Date: January 6, 2005 Survey I DLS Computation Method: Minimum Curvature I Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 355.000"
Field: Prudhoe Bay Unit - WOA 0211 1/05 Vertical Section Origin: N 0.000 It, E 0.000 ft
Structure I Slot: L-PAD / L-212 APproved lVD Reference Datum: Rotary Table
Well: Plan L-212 (N-O) lVD Reference Elevation: 77.80 ft relative to MSL
Borehole: Plan L-212PB1 Sea Bed I Ground Level Elevation: 49.30 ft relative to MSL
UWIIAPI#: 50029 Magnetic Declination: 24.550"
Survey Name I Date: L-212PB1 (P8b) I January 6,2005 Total Field Strength: 57605.083 nT
Tort I AHD I DDII ERD ratio: 129.785" /11117.77 ft /6.475/1.613 Magnetic Dip: 80.810"
Grid Coordinate System: NAD27 Alaska State Pianes, Zone 04, US Feet Declination Date: 10-Mar-05
Location Lat/Long: N 70.35067585, W 149.32418283 Magnetic Declination Model: BGGM 2004
Location Grid N/E YfX: N 5978297.430 ftUS, E 583238.450 ftUS North Reference: True North
Grid Convergence Angle: +0.63646655" Total Corr Mag North -> True North: +24.550"
Grid Scale Factor: 0.99990787 Local Coordinates Referenced To: Well Head
.
Comments
RTE
KOP Bid 1.5/100
GI
Bid 2.5/100
600.00 6.50 356.72 521.64 599.44 15.25 15.26 15.23 -0.87 2.50 O.OOG 2.50 0.00 5978312.65 583237.41 N 70.35071746 W 149.32418992
700.00 9.00 356.72 620.72 698.52 28.73 28.74 28.69 -1.64 2.50 O.OOG 2.50 0.00 5978326.10 583236.49 N 70.35075424 W 149.32419618
800.00 11.50 356.72 719.11 796.91 46.51 46.53 46.46 -2.66 2.50 O.OOG 2.50 0.00 5978343.85 583235.27 N 70.35080277 W 149.32420444
900.00 14.00 356.72 816.64 894.44 68.57 68.60 68.49 -3.93 2.50 O.OOG 2.50 0.00 5978365.86 583233.76 N 70.35086296 W 149.32421469
SV6 975.93 15.90 356.72 890.00 967.80 88.15 88.19 88.04 -5.05 2.50 O.OOG 2.50 0.00 5978385.40 583232.43 N 70.35091638 W 149.32422379
1000.00 16.50 356.72 913.11 990.91 94.86 94.90 94.75 -5.43 2.50 O.OOG 2.50 0.00 5978392.10 583231.97 N 70.35093469 W 149.32422691
Bid 4/100 1010.00 16.75 356.72 922.69 1000.49 97.72 97.76 97.60 -5.59 2.50 O.OOG 2.50 0.00 5978394.96 583231 .77 N 70.35094249 W 149.32_
1100.00 20.35 356.72 1008.00 1085.80 126.33 126.39 126.18 -7.23 4.00 O.OOG 4.00 0.00 5978423.51 583229.82 N 70.35102057 W 149.32
1200.00 24.35 356.72 1100.47 1178.27 164.33 164.41 164.14 -9.41 4.00 O.OOG 4.00 0.00 5978461.44 583227.22 N 70.35112426 W 149.324 .
1300.00 28.35 356.72 1190.06 1267.86 208.69 208.78 208.44 -11.94 4.00 O.OOG 4.00 0.00 5978505.71 583224.19 N 70.35124530 W 149.32427979
1400.00 32.35 356.72 1276.34 1354.14 259.19 259.30 258.88 -14.83 4.00 O.OOG 4.00 0.00 5978556.10 583220.74 N 70.35138308 W 149.32430324
1500.00 36.35 356.72 1358.89 1436.69 315.57 315.72 315.20 -18.06 4.00 O.OOG 4.00 0.00 5978612.38 583216.89 N 70.35153695 W 149.32432943
Fault Crossing 1526.40 37.41 356.72 1380.00 1457.80 331.41 331.56 331.01 -18.96 4.00 O.OOG 4.00 0.00 5978628.18 583215.81 N 70.35158015 W 149.32433678
1600.00 40.35 356.72 1437.29 1515.09 377.58 377.75 377.13 -21.60 4.00 O.OOG 4.00 0.00 5978674.26 583212.66 N 70.35170614 W 149.32435822
SV5 1657.02 42.63 356.72 1480.00 1557.80 415.33 415.52 414.84 -23.76 4.00 O.OOG 4.00 0.00 5978711.94 583210.08 N 70.35180916 W 149.32437575
1700.00 44.35 356.72 1511.18 1588.98 444.90 445.10 444.37 -25.45 4.00 O.OOG 4.00 0.00 5978741.45 583208.06 N 70.35188984 W 149.32438948
1800.00 48.35 356.72 1580.19 1657.99 517.21 517.44 516.60 -29.59 4.00 O.OOG 4.00 0.00 5978813.62 583203.13 N 70.35208715 W 149.32442305
SV4 1837.89 49.87 356.72 1605.00 1682.80 545.84 546.09 545.20 -31.23 4.00 O.OOG 4.00 0.00 5978842.19 583201.17 N 70.35216528 W 149.32443635
1900.00 52.35 356.72 1643.99 1721.79 594.16 594.42 593.45 -33.99 4.00 O.OOG 4.00 0.00 5978890.41 583197.87 N 70.35229711 W 149.32445878
Base Perm 1960.63 54.78 356.72 1680.00 1757.80 642.91 643.20 642.15 -36.78 4.00 O.OOG 4.00 0.00 5978939.07 583194.55 N 70.35243014 W 149.32448142
WeliDesign Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 )
L-212\Plan L-212 (N-O)\Plan L-212PB1\L-212PB1 (P8b)
Generated 2/17/20054:07 PM Page 1 of 3
Comments
End Bid
SV3
SV2 2927.04 64.86 356.72 2110.00 2187.80 1506.82 1507.51 1505.04 -86.17 0.00 O.OOG 0.00 0.00 5979801.28 583135.57 N 70.35478748 W 149.32488254
SV1 3692.16 64.86 356.72 2435.00 2512.80 2199.17 2200.17 2196.57 -125.76 0.00 O.OOG 0.00 0.00 5980492.26 583088.31 N 70.35667668 W 149.32520406
9-5/8" Csg pt 3927.58 64.86 356.72 2535.00 2612.80 2412.20 2413.29 2409.35 -137.94 0.00 O.OOG 0.00 0.00 5980704.87 583073.77 N 70.35725797 W 149.32530300
Cry 4/100 4160.65 64.86 356.72 2634.00 2711.80 2623.10 2624.29 2620.00 -150.00 0.00 -27.13G 0.00 0.00 5980915.36 583059.37 N 70.35783344 W 149.32540096
4200.00 66.27 355.94 2650.28 2728.08 2658.92 2660.12 2655.75 -152.29 4.00 -26.80G 3.57 -1.99 5980951.08 583056.68 N 70.35793111 W 149.32541959
4300.00 69.85 354.02 2687.64 2765.44 2751.65 2752.86 2748.13 -160.43 4.00 -26.09G 3.58 -1.92 5981043.35 583047.52 N 70.35818348 W 149.32_
4400.00 73.45 352.19 2719.12 2796.92 2846.50 2847.75 2842.34 -171.84 4.00 -25.51G 3.60 -1.83 5981137.41 583035.07 N 70.35844084 W 149.325
4500.00 77.07 350.42 2744.57 2822.37 2942.98 2944.45 2937.91 -186.47 4.00 -25.06G 3.62 -1.77 5981232.81 583019.37 N 70.35870194 W 149.32569722
End Cry 4518.57 77.74 350.10 2748.62 2826.42 2961.05 2962.57 2955.77 -189.54 4.00 O.OOG 3.62 -1.73 5981250.64 583016.11 N 70.35875074 W 149.32572213
UG4 4548.64 77.74 350.10 2755.00 2832.80 2990.32 2991.95 2984.72 -194.59 0.00 O.OOG 0.00 0.00 5981279.52 583010.74 N 70.35882981 W149.32576317
UG4A 4737.02 77.74 350.10 2795.00 2872.80 3173.73 3176.03 3166.06 -226.25 0.00 O.OOG 0.00 0.00 5981460.48 582977.07 N 70.35932521 W 149.32602031
Fault Crossing 4784.11 77.74 350.10 2805.00 2882.80 3219.58 3222.05 3211.39 -234.16 0.00 O.OOG 0.00 0.00 5981505.72 582968.65 N 70.35944906 W 149.32608460
UG3 5796.64 77.74 350.10 3020.00 3097.80 4205.40 4211.49 4186.09 -404.32 0.00 O.OOG 0.00 0.00 5982478.37 582787.70 N 70.36211182 W 149.32746695
UG1 8245.54 77.74 350.10 3540.00 3617.80 6589.70 6604.55 6543.49 -815.86 0.00 O.OOG 0.00 0.00 5984830.84 582350.04 N 70.36855192 W 149.33081179
Fault Crossing 8669.38 77.74 350.10 3630.00 3707.80 7002.36 7018.73 6951.50 -887.09 0.00 O.OOG 0.00 0.00 5985237.99 582274.29 N 70.36966655 W 149.33139092
Ma 9893.83 77.74 350.10 3890.00 3967.80 8194.51 8215.26 8130.20 -1092.86 0.00 O.OOG 0.00 0.00 5986414.23 582055.46 N 70.37288657 W 149.33306431
Mb1 10082.21 77.74 350.10 3930.00 4007.80 8377.92 8399.34 8311.54 -1124.51 0.00 O.OOG 0.00 0.00 5986595.19 582021.79 N 70.37338196 W 149.33332180
Mb2 10435.42 77.74 350.10 4005.00 4082.80 8721.81 8744.49 8651.55 -1183.87 0.00 O.OOG 0.00 0.00 5986934.48 581958.67 N 70.37431081 W 149.33380463
Cry 4/100 10613.38 77.74 350.10 4042.79 4120.59 8895.07 8918.39 8822.86 -1213.78 0.00 -154.27G 0.00 0.00 5987105.43 581926.87 N 70.37477879 W 149.33404792
10700.00 74.62 348.54 4063.48 4141.28 8978.76 9002.49 8905.51 -1229.36 4.00 -153.90G -3.60 -1.80 5987187.89 581910.37 N 70.37500457 W 149.33417467
Me 10774.83 71.94 347.15 4085.00 4162.80 9049.87 9074.15 8975.56 -1244.44 4.00 -153.50G -3.59 -1.85 5987257.77 581894.51 N 70.37519594 W 149.33429734
10800.00 71.04 346.68 4092.99 4170.79 9073.50 9098.02 8998.81 -1249.84 4.00 -153.35G -3.58 -1.89 5987280.95 581888.85 N 70.37525945 W 149.33434129
10900.00 67.48 344.74 4128.40 4206.20 9165.77 9191.52 9089.42 -1272.91 4.00 -152.66G -3.56 -1.94 5987371.29 581864.78 N 70.37550698 W 149.33452887
Na 10966.18 65.13 343.40 4155.00 4232.80 9225.26 9252.12 9147.68 -1289.53 4.00 -152.12G -3.54 -2.02 5987429.36 581847.51 N 70.37566614 W 149.33466409
11000.00 63.94 342.69 4169.54 4247.34 9255.14 9282.65 9176.89 -1298.44 4.00 -151.82G -3.53 -2.08 5987458.47 581838.29 N 70.37574593 W 149.33473fì50
Nb 11023.45 63.11 342.20 4180.00 4257.80 9275.63 9303.64 9196.90 -1304.77 4.00 -151.60G -3.52 -2.12 5987478.41 581831.73 N 70.37580061 W 149.334.
11100.00 60.43 340.52 4216.21 4294.01 9341.16 9371.08 9260.80 -1326.31 4.00 -150.80G -3.51 -2.19 5987542.06 581809.48 N 70.37597516 W 149.33496318
Ne 11127.54 59.47 339.90 4230.00 4307.80 9364.20 9394.91 9283.23 -1334.38 4.00 -150.49G -3.49 -2.27 5987564.39 581801.17 N 70.37603642 W 149.33502880
11200.00 56.95 338.20 4268.17 4345.97 9423.42 9456.50 9340.75 -1356.39 4.00 -149.59G -3.47 -2.35 5987621.66 581778.52 N 70.37619354 W 149.33520779
OA 11221.48 56.21 337.67 4280.00 4357.80 9440.56 9474.43 9357.36 -1363.12 4.00 -149.31G -3.44 -2.44 5987638.19 581771.60 N 70.37623892 W 149.33526255
Target 1 11256.88 55.00 336.79 4300.00 4377 .80 9468.38 9503.64 9384.30 -1374.43 4.00 180.00G -3.43 -2.49 5987665.00 581760.00 N 70.37631252 W 149.33535448
11300.00 53.28 336.79 4325.26 4403.06 9501.57 9538.58 9416.41 -1388.20 4.00 180.00G -4.00 0.00 5987696.96 581745.88 N 70.37640024 W 149.33546646
OBa 11307.90 52.96 336.79 4330.00 4407.80 9507.57 9544.90 9422.22 -1390.69 4.00 180.00G -4.00 0.00 5987702.74 581743.32 N 70.37641611 W 149.33548671
OBb 11380.22 50.07 336.79 4375.00 4452.80 9561.34 9601.50 9474.24 -1413.00 4.00 180.00G -4.00 0.00 5987754.50 581720.44 N 70.37655820 W 149.33566810
11400.00 49.28 336.79 4387.80 4465.60 9575.67 9616.58 9488.10 -1418.94 4.00 180.00G -4.00 0.00 5987768.29 581714.34 N 70.37659607 W 149.33571643
OBe 11455.77 47.04 336.79 4425.00 4502.80 9615.13 9658.13 9526.28 -1435.31 4.00 180.00G -4.00 0.00 5987806.29 581697.55 N 70.37670037 W 149.33584957
11500.00 45.28 336.79 4455.64 4533.44 9645.43 9690.03 9555.60 -1447.88 4.00 180.00G -4.00 0.00 5987835.46 581684.66 N 70.37678047 W 149.33595181
OBd 11527.25 44.19 336.79 4475.00 4552.80 9663.65 9709.21 9573.23 -1455.44 4.00 180.00G -4.00 0.00 5987853.01 581676.90 N 70.37682862 W 149.33601328
11600.00 41.28 336.79 4528.43 4606.23 9710.54 9758.57 9618.60 -1474.89 4.00 180.00G -4.00 0.00 5987898.14 581656.95 N 70.37695254 W 149.33617145
Well Design Ver 3.1RT-SP3.03-HF5.00 Bld( do31rt-546)
L-212\Plan L-212 (N-O)\Plan L-212PB1\L-212PB1 (P8b)
Generated 2/17/2005 4:07 PM Page 2 of 3
Comments
11700.00 37.28 336.79 4605.83 4683.63 9770.66 9821.86 9676.77 -1499.83 4.00 180.00G -4.00 0.00 5987956.03 581631.37 N 70.37711144 W 149.33637428
OBf 11705.24 37.07 336.79 4610.00 4687.80 9773.67 9825.03 9679.68 -1501.08 4.00 180.00G -4.00 0.00 5987958.92 581630.09 N 70.37711939 W 149.33638442
OBf Base 11754.73 35.09 336.79 4650.00 4727.80 9801.35 9854.17 9706.46 -1512.57 4.00 180.00G -4.00 0.00 5987985.58 581618.31 N 70.37719255 W 149.33647781
11800.00 33.28 336.79 4687.45 4765.25 9825.51 9879.60 9729.83 -1522.59 4.00 180.00G -4.00 0.00 5988008.84 581608.03 N 70.37725640 W 149.33655931
End Cry 11878.47 30.14 336.79 4754.20 4832.00 9864.68 9920.84 9767.73 -1538.84 4.00 O.OOG -4.00 0.00 5988046.55 581591.36 N 70.37735993 W 149.33669146
CM2 12093.31 30.14 336.79 4940.00 5017.80 9967.14 10028.70 9866.87 -1581.34 0.00 O.OOG 0.00 0.00 5988145.20 581547.77 N 70.37763074 W 149.33703710
Fault Crossing 12885.37 30.14 336.79 5625.00 5702.80 10344.90 10426.36 10232.36 -1738.03 0.00 O.OOG 0.00 0.00 5988508.89 581387.04 N 70.37862912 W 149.33831150
CM1 12885.38 30.14 336.79 5625.01 5702.81 10344.90 10426.36 10232.36 -1738.03 0.00 O.OOG 0.00 0.00 5988508.89 581387.04 N 70.37862914 W 149.33831152
Top HRZ 13492.43 30.14 336.79 6150.00 6227.80 10634.42 10731.14 10512.48 -1858.12 0.00 O.OOG 0.00 0.00 5988787.63 581263.85 N 70.37939430 W 149.339.
Top Kaiubik 13717.90 30.14 336.79 6345.00 6422.80 10741.96 10844.34 10616.52 -1902.73 0.00 O.OOG 0.00 0.00 5988891.16 581218.10 N 70.37967851 W 149.339
K1 13787.28 30.14 336.79 6405.00 6482.80 10775.04 10879.17 10648.53 -1916.45 0.00 O.OOG 0.00 0.00 5988923.02 581204.02 N 70.37976596 W 149.33976279
Target 2 13954.94 30.14 336.79 6550.00 6627.80 10855.01 10963.35 10725.90 -1949.62 0.00 O.OOG 0.00 0.00 5989000.00 581170.00 N 70.37997729 W 149.34003260
Kuparuk 0 13954.95 30.14 336.79 6550.01 6627.81 10855.01 10963.35 10725.91 -1949.62 0.00 O.OOG 0.00 0.00 5989000.01 581170.00 N 70.37997730 W 149.34003262
Kuparuk C 14012.76 30.14 336.79 6600.00 6677.80 10882.58 10992.37 10752.58 -1961.06 0.00 O.OOG 0.00 0.00 5989026.55 581158.27 N 70.38005016 W 149.34012564
Kuparuk C1 14070.57 30.14 336.79 6650.00 6727.80 10910.15 11021.40 10779.26 -1972.49 0.00 O.OOG 0.00 0.00 5989053.10 581146.54 N 70.38012304 W 149.34021867
Kup B/ LCU 14111.04 30.14 336.79 6685.00 6762.80 10929.45 11041.72 10797.93 -1980.50 0.00 O.OOG 0.00 0.00 5989071.68 581138.32 N 70.38017405 W 149.34028380
TO - 14262.52 30.14 336.79 6816.00 6893.80 11001.70 11117.77 10867.83 -2010.47 0.00 O.OOG 0.00 0.00 5989141.23 581107.59 N 70.38036498 W 149.34052757
Leaal DescriDtion:
Northina IVI [ftUS1 Eastina IXI [ftUSl
Surface: 2575 FSL 3676 FEL S34 T12N R 11 E UM 5978297.43 583238.45
Cry 4/100: 5195 FSL 3821 FEL S34 T12N R11E UM 5980915.36 583059.37
Target 1 : 1399 FSL 5032 FEL S22 T12N R11E UM 5987665.00 581760.00
Target 2: 2741 FSL 325 FEL S21 T12N R11E UM 5989000.00 581170.00
BHL: 2883 FSL 385 FEL S21 T12N R11E UM 5989141.23 581107.59
-
WellDesign Ver 3.1 RT-SP3.03-HF5.00 Bld( do31 rt-546 )
L-212\Plan L-212 (N-O)\Plan L-212PB1\L-212PB1 (P8b)
Generated 2/17/2005 4:07 PM Page 3 of 3
1500
2
è5
o
l{)
~
;.:..
§.
~
3000
II
<D
TI
en
o
¡::
4500
6000
7500
Magnetic: Parameters
Model BGGM 2004
L-212PB1 (P8b)
o
o
·'_n_..
_KOP Bid 1.5/100
'""--Bid 2.5/100
............... Bid 4/100
V
o
Dip 80.810'
MagDec +24.579'
1500
RTE
End E Id
.~
~""-
Date Fabruary15,2005 Lat
FS: 57603.5nT Lon
3000
'~crv;'~oo
'>!!<l u_..
~ /EndC;.,
1500
- .
Prudhoe Bay Unit - WOA
N70212.433
W1491927.058
NAD27 Alaska State Planes, Zone 04, US Feet
Northing 5978297.43/tUS Grid Corov: +0.63646655"
Easting: 583238.45ftUS Scale Fad; 0.9999078707
STRUCTURE L-P AD
Miscelloooous
Slot t·212
Plan: L-212PB1 (pab)
TVD ReI: Rotary Table (77.80 ft above MSL)
$rvyOate: January06,2005
4500
6000
7500
9000
10500
lJG:
,,_.
------- /
w-~
:----.
..~, ~,uu
L·212PB1 To
..-..-..
.-.. ..-»-..-
":..;..",:,,
'\""" "aso
\. i/FaUII Crossing
"\
:\ L·212PB1 Tat
lOp HKL \u_"_j
.-..
~~ {:"/
/~/-L'212PB1 (PBc
TD
3000 4500 6000 7500 9000
Vertical Section (ft) Azim = 355°, Scale = 1(in):1500(ft) Origin = 0 N/-S, 0 E/-W
10500
12000
12000
o
.
1500
3000
4500
-
6000
7500
·
-
Schlumberger
L-212PB1 (P8b)
FIELD
Prudhoe Bay Unit - WOA
STRUCTURE L-PAD
Magnetic Parameters
Model: BGGM 2Q04
Dip: 80.810'
MagDec" +24.579°
Date: February 15.20Oó
FS: 57603.5nT
Surface Location
Lat: N70212.433
Lon W1491927.058
NAD27 Alaska state Planes, Zone 04, US Feet
Nortt1ing: 5978297.43ftUS GridCOI1v; +0.63646655·
EastÍl1g; 583238.45 flUS scale Fact: 0.9999078707
Slot:
P.o
L·212
L-212PB1 (P8b)
TVD Ref: Rotary Table (77.ao ft above MSl)
SrvyDate: ~nuary06.2005
-4500
-3000
-1500
o
1500
9000
:N
10500
10500
9000
7500 7500
^
^
^
z
<::: 6000
0 6000
0
I!)
~
§:
~
II
Q)
ro
ü
(/)
(/) 4500 4500
V
V
V
3000
3000
1500
1500
End Bid
o
Fault Crossin
Bid 41100
Bid 2.51100
o
KOP Bid 1.51100 RTE
-4500
-3000 -1500 0
<<< W Scale = 1 (in):1500(ft) E >>>
1500
o
It
\500
3000
4-500
SOOO
. l500
<=1000
_ \ ~::s:) D
D
\~GG
3GGG \
---
~
e::::::>
- Plan L-212PBJ
Plan L-212
(N-O)/Plan L-212PBI
--
~
e::::::>
'-S
~
~
~
---
~
~
---
~
~
---
'-&
~
s
~
cs
~
-cb
~
~~
·
e
Oilfield Services, Alaska
Schlumberger Drilling & Measurements
Schlu
erger
2525 Gambell, Suite 400
Anchorage, AK 99503
Tel (907) 273-1766
Fax (907) 561-8367
Monday, February 21, 2005
Mik Triolo
Prudhoe Bay L-212PB1 (P8b)
BP Exploration Alaska Nabors 9ES
Close Approach Analysis
We have examined the potential intersections of subject well with all other potentially conflicting wells, according to
the BPA Directional Survey handbook (BPA-D-004) dated 09/99.
Method of analvsis:
1. A list of wells to be analyzed is created in Compass by performing a global scan with an initial search radius of
two thousand feet with an increment of one hundred feet for every one thousand feet of measured depth in the
subject well.
2. Wells are analyzed using the Compass Anti-collision module (BP Company setup) with major risk safety
factors applied. For problem wells that are plugged and abandoned or that can be shut in, risk-based safety factor
may be used, with client notification.
3. All depths are relative to the planned well profile.
Survey Proqram:
Instrument Type
MWD
MWD + IFR + MS
Start Depth
28.50'md
28.50'md
End Depth
1,400.00'md
14,262.52'md
Close Approach Analvsis results:
Under method (2), all wells may flow.
All data documenting these procedures is available for inspection at the Drilling & Measurements Directional
Planning Center.
Close Approach Drillinq Aids to be provided:
A drilling map and traveling cylinder will be provided.
Checked by:
Scott Delapp 02/21/05
·
BP Alaska
Anticollision Report
e
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 28.50 to 14262.52 ft
Maximum Radius: 10000.00 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 2/27/2004 Validated: No
Planned From To Survey
ft ft
28.50 1400.00 Planned: Plan #8 V1
28.50 14262.52 Planned: Plan #8 V1
Version: 4
Toolcode
Tool Name
MWD
MWD+IFR+MS
MWD - Standard
MWD + IFR + Multi Station
Casing Points
PB L Pad L-01 L-01 V14 301.05 300.00 182.98 4.73 178.25 Pass: Major Risk
PB L Pad L-02 L-02 V1 589.88 600.00 188.80 9.50 179.30 Pass: Major Risk
PB L Pad L-02 L-02A V5 595.51 600.00 188.90 9.68 179.21 Pass: Major Risk
PB L Pad L-02 L-02PB1 V21 589.88 600.00 188.80 9.60 179.19 Pass: Major Risk
PB L Pad L-101 L-101 V4 1290.37 1350.00 198.06 25.53 172.53 Pass: Major Risk
PB L Pad L-102 L-102 V2 248.80 250.00 225.31 3.91 221.40 Pass: Major Risk
PB L Pad L-102 L-102PB1 V10 248.80 250.00 225.31 4.00 221.31 Pass: Major Risk
PB L Pad L-102 L-102PB2 V2 248.80 250.00 225.31 4.00 221.31 Pass: Major Risk
PB L Pad L-103 L-103 V23 549.61 550.00 61.45 8.43 53.02 Pass: Major Risk
PB L Pad L-104 L-104 V7 346.78 350.00 206.96 5.69 201.27 Pass: Major Risk
PB L Pad L-105 L-105 V4 346.94 350.00 192.27 6.03 186.24 Pass: Major Risk
PB L Pad L-106 L-106 V14 628.81 650.00 188.34 10.11 178.23 Pass: Major Risk
PB L Pad L-107 L-107V14 300.39 300.00 181.13 6.24 174.89 Pass: Major Risk
PB L Pad L-108 L-108 V18 488.63 500.00 180.57 8.59 171.98 Pass: Major Risk
PB L Pad L-109 L-109 V12 301.33 300.00 205.17 6.06 199.11 Pass: Major Risk
PB L Pad L-110 L-110V11 300.65 300.00 232.27 5.30 226.98 Pass: Major Risk
PB L Pad L-111 L-111 V24 251.59 250.00 309.34 4.33 305.01 Pass: Major Risk
PB L Pad L-112 L-112 V8 345.26 350.00 207.35 6.99 200.36 Pass: Major Risk
PB L Pad L-114 L-114 V15 396.04 400.00 283.70 6.02 277.69 Pass: Major Risk
PB L Pad L-115 L-115V7 546.97 550.00 128.80 8.96 119.84 Pass: Major Risk
PB L Pad L-116 L-116 V10 396.54 400.00 215.08 5.79 209.29 Pass: Major Risk
PB L Pad L-117 L-117V11 449.60 450.00 116.38 6.89 109.49 Pass: Major Risk
PB L Pad L-118 L-118V9 1133.36 1150.00 90.59 20.36 70.23 Pass: Major Risk
PB L Pad L-119 L-119V9 600.71 600.00 108.01 9.79 98.22 Pass: Major Risk
PB L Pad L-120 L-120 V8 298.68 300.00 137.04 4.94 132.10 Pass: Major Risk
PB L Pad L-121 L-121 V14 201.39 200.00 252.62 3.54 249.08 Pass: Major Risk
PB L Pad L-121 L-121A V1 201.39 200.00 252.62 3.54 249.08 Pass: Major Risk
PB L Pad L-122 L-122 V5 350.39 350.00 161.04 5.55 155.48 Pass: Major Risk
PB L Pad L-200 L-200 V7 350.04 350.00 31.52 5.93 25.59 Pass: Major Risk
PB L Pad L-200 L-200L 1 V3 350.04 350.00 31.52 5.93 25.59 Pass: Major Risk
PB L Pad L-200 L-200L2 V6 350.04 350.00 31.52 5.93 25.59 Pass: Major Risk
PB L Pad L-201 L-201 V6 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-201 L-201L 1 V9 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-201 L-201 L 1 PB1 V10 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-201 L-201 L2 V5 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-201 L-201 L3 V2 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-201 L-201L3PB1 V6 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-201 L-201 PB1 V12 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-201 L-201 PB2 V3 299.08 300.00 90.17 4.95 85.22 Pass: Major Risk
PB L Pad L-210 L-210 V6 248.49 250.00 120.12 4.05 116.07 Pass: Major Risk
PB L Pad L-210 L-210PB1 V8 248.49 250.00 120.12 4.05 116.07 Pass: Major Risk
PB L Pad L-211 L-211 V6 547.93 550.00 136.49 9.48 127.01 Pass: Major Risk
PB L Pad L-211 L-211PB1 V6 547.93 550.00 136.49 9.48 127.01 Pass: Major Risk
.
BP Alaska
Anticollision Report
.
PB L Pad L-216 L-216 V6 249.40 250.00 45.04 4.21 40.83 Pass: Major Risk
PB L Pad NWE1-01 L-100 V2 250.79 250.00 359.77 4.22 355.55 Pass: Major Risk
PB L Pad NWE1-01 NWE1-01 V5 250.79 250.00 359.77 4.22 355.55 Pass: Major Risk
PB L Pad Plan L-03 (S-O) Plan L-03 V3 Plan: Pia 627.85 650.00 176.10 11.48 164.62 Pass: Major Risk
PB L Pad Plan L-113 (N-B) Plan L-113 V5 Plan: PI 354.55 350.00 235.49 7.71 227.78 Pass: Major Risk
PB L Pad Plan L-123 (S-U) Plan L-123 V3 Plan: PI 394.80 400.00 203.08 7.15 195.94 Pass: Major Risk
PB L Pad Plan L-124 (N-C) Plan L-124 V5 Plan: PI 404.01 400.00 220.79 7.05 213.73 Pass: Major Risk
PB L Pad Plan L-124 (N-C) Plan L-124PB1 V2 Plan: 404.01 400.00 220.79 7.05 213.73 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202 V1 Plan: PI 450.24 450.00 16.20 7.79 8.41 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202L 1 OBb V3 PI 450.24 450.00 16.20 7.90 8.30 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202L2 OBa V3 PI 450.24 450.00 16.20 7.90 8.30 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202L3 OA V3 Pia 450.24 450.00 16.20 7.90 8.30 Pass: Major Risk
PB L Pad Plan L-203 (N-Q) Plan L-203 V4 Plan: PI 549.23 550.00 29.87 10.07 19.80 Pass: Major Risk
PB L Pad Plan L-214 (S-W) Plan L-214 V1 Plan: PI 395.07 400.00 216.59 6.98 209.61 Pass: Major Risk
Field: Prudhoe Bay
Site: PB L Pad
Well: Plan L-212 (N-O)
Wellpath: Plan L-212PBl
294
Planl1laD34-IN4«}{.£I~~HlahJ4ßB4 )
.
200
100
L-2œe (L-2œep)
27
90
L-201 (L-201~!1)
(.¡-.znl~J16:r¡Rlanp1an L-203)
.
·]00
200
294
L(¡.;J~I(IH1!4)
L-1lOliiWi I )
~tI8~ (L-109) L-101 (L-1dt'j0
_, L-I04 (L-104)
50
-105 \k(05)
l']ah!-~~f~s-\Jj'(1'lan L- 123)
LlI~~(N-N) (1'1an L-202p O~)
L-01 e¡J'IJ1Jr-03 (S-O) (1'1an L-03)
Travelling Cylinder Azimuth (TFO+AZ1) [dcg} YS Centre to Centre Separation [100ft/in]
Site: PB L Pad
Drilling Target Conf.: 95%
Description:
Map Northing: 5987845.00 ft
Map Easting : 581670.00 ft
Latitude: 70022'36.505N
Shape: Circle
Target: L-212PBl Tgt 1 Sch
Well: Plan L-2l2 (N-O)
Based on: Planned Program
Vertical Depth: 4300.00 ft below Mean Sea Level
Local +N/-S: 9565.29 ft
Local +E/-W: -1462.43 ft
Longitude: l49°20'09.852W
Radius: 150 ft
.
9900
9800
9100
N
9500
9500
e
94-00
9300
0 0 0 0 0 0 0
00 0 0 0 0 0 0
00, u:J Ln J (I) N
o 0 ) )
H)
~ J
L
Site: PB L Pad
Drilling Target Conf.: 95%
Description:
Map Northing: 5989000.00 ft
Map Easting : 580970.00 ft
Latitude: 70022'47.940N
Shape: Circle
Target: L-212PBl Tgt 2 Kup
Well: Plan L-212 (N-O)
Based on: Planned Program
Vertical Depth: 6550.00 ft below Mean Sea Level
Local +N/-S: 10728.10 ft
Local +E/-W: -2149.62 ft
Longitude: 149°20'29.971W
Radius: 150 ft
11100
11000
10900
10800
10lOO
10500
10500
0 D D D D D D
o 0 D D D D D D
o 0 ~ (I) N D 0- m
N N N N
o ~ I I I I
~ ~
~
.
N
e
L-212 (P6b)
r
r
Magnetic Declination:
Total Field Strength:
Magnetic Dip:
Declination Date:
Magnetic Declination Model:
North Reference:
Total Corr Mag North .> True North:
Local Coordinates Referenced To:
Minimum Curvature I Lubinski
355.000·
N 0.000 It, E 0.000 It
Rotary Table
77.80 It relative to MSL
49.30 It relative to MSL
24.579·
57603.487 nT
80.810·
February 15.2005
BGGM 2004
True North
+24.579·
Well Head
.
Report Date:
Client:
Field:
Structure I Slot:
Well:
Borehole:
UWI/API#:
Survey Name I Date:
Tort I AHD I DDII ERD ratio:
Grid Coordinate System:
Location LaULong:
Location Grid N/E YIX:
Grid Convergence Angle:
Grid Scale Factor:
January 7,2005
BP Exploration Alaska
Prudhoe Bay Unit - WOA
L-PAD I L-212
Plan L·212 (N-O)
Plan L-212
50029
L-212 (P6b) / January 7, 2005
103,249· 16779,66 It /6.111/1.422
NAD27 Alaska State Planes, Zone 04, US Feet
N 70.35067585, W 149.32418283
N 5978297.430 ItUS, E 583238.450 ItUS
+0.63646655·
0.99990787
Survey I DLS Computation Method:
Vertical Section Azimuth:
11/05 Vertical Section Origin:
d 021 TVD Reference Datum:
TVD Reference Elevation:
Ove Sea Bed I Ground Level Elevation:
Comments Latitude
KOP Cry 4/100 N 70.35783344 W 149.32540096
End Cry N 70.35789010 W 149.32541107
UG4 N 70.35848266 W 149,32552170
UG4A N 70.35867821 W 149.32555822
Fault Crossing N 70.35940455 W 149.32569384
UG3 5086.76 63.99 356.41 3040,00 3117.80 3455.23 3456.67 3450.74 -202.10 0.00 O.OOG 0,00 0.00 5981745,39 582998.05 N 70,36010295 W 149.32582426
Cry 4/100 5900,18 63.99 356.41 3396.73 3474,53 4186,02 4187.68 4180,32 -247,91 0.00 88.92G 0,00 0.00 5982474,35 582944.15 N 70.36209609 W 149,32619650
6000.00 64.13 0.84 344Q.42 3518.22 4275.58 4277 .44 4270.03 -250,06 4.00 86.98G 0,14 4.45 5982564.02 582941.00 N 70.36234117 W 149.32621398
6100,00 64.41 5,27 3483.85 3561.65 4364,74 4367,52 4359.96 -245.25 4,00 85.06G 0.28 4.43 5982653.98 582944.81 N 70.36258683 W 149.32617493
UG1 6125.86 64.50 6.42 3495.00 3572.80 4387,66 4390.85 4383.17 -242.87 4.00 84,56G 0.36 4.42 5982677.22 582946.93 N 70.36265025 W 149.32615563
L-212 Fit Tgt 6195.92 64.80 9,50 3525.00 3602.80 4449.35 4454.16 4445.86 -234,11 4.00 89.00G 0.42 4.40 5982740.00 582955.00 N 70.36282152 W 149,32608443
6200.00 64.80 9.68 3526.74 3604,54 4452,92 4457,85 4449.50 -233.49 4.00 88.92G 0.07 4.42 5982743.65 582955.57 N 70.36283146 W 149.32_
6300.00 64,94 14.10 3569.22 3647.02 4539.52 4548.38 4538.07 -214.84 4.00 87.05G 0.14 4.42 5982832.40 582973.23 N 70.36307341 W 149.32
6400.00 65.21 18.50 3611.37 3689.17 4623.99 4639.06 4625.08 -189.40 4,00 85.19G 0.27 4.40 5982919.69 582997.71 N 70.36331113 W 149,325 4
End Cry 6470.83 65.48 21.60 3640.92 3718,72 4682.30 4703.43 4685.54 -167.34 4.00 O,OOG 0.38 4.38 5982980,38 583019.10 N 70,36347631 W 149.32554212
Ma 6938.56 65,48 21.60 3835.00 3912.80 5062.82 5129.00 5081.22 -10.68 0.00 O.OOG 0.00 0.00 5983377.74 583171.34 N 70.36455728 W 149.32426956
Mb1 7022.91 65.48 21.60 3870.00 3947.80 5131.44 5205.74 5152.58 17.57 0.00 O.OOG 0,00 0.00 5983449,40 583198.79 N 70.36475221 W 149.32404006
Mb2 7203.65 65.48 21.60 3945.00 4022.80 5278.49 5370.19 5305.48 78.11 0.00 O.OOG 0.00 0.00 5983602,95 583257. 62 N 70.36516993 W 149.32354826
Me 7384.40 65.48 21.60 4020.00 4097.80 5425.53 5534,64 5458.39 138.65 0.00 O.OOG 0.00 0.00 5983756.51 583316.45 N 70,36558764 W 149.32305644
Na 7504,90 65.48 21.60 4070.00 4147.80 5523.56 5644.28 5560.32 179.01 0.00 O.OOG 0.00 0.00 5983858,87 583355.67 N 70.36586612 W 149.32272855
Nb 7577.20 65.48 21.60 4100.00 4177.80 5582.38 5710.06 5621.48 203.22 0.00 O.OOG 0,00 0.00 5983920.30 583379.20 N 70.36603321 W 149.32253181
Ne 7685.65 65.48 21.60 4145,00 4222.80 5670.61 5808.73 5713.23 239,54 0.00 O.OOG 0.00 0,00 5984012.43 583414.50 N 70,36628383 W 149.32223669
OA 7902.54 65.48 21.60 4235.00 4312.80 5847.06 6006.07 5896.71 312.19 0.00 O.OOG 0.00 0.00 5984196.69 583485,09 N 70,36678509 W 149.32164644
OBa 8035.09 65.48 21,60 4290,00 4367.80 5954.90 6126.67 6008.84 356.58 0,00 O.OOG 0,00 0.00 5984309.29 583528,24 N 70.36709141 W 149.32128572
L-212 Tgt 8071.24 65.48 21.60 4305.00 4382.80 5984.30 6159,56 6039.42 368.69 0,00 180.00G 0,00 0.00 5984340,00 583540.00 N 70.36717495 W 149.32118734
WellDésign Ver 3.1 RT-SP3,03-HF5.00 Bld( d031 rt-546 )
L-212\Plan L-212 (N-O)\Plan L-212\L-212 (P6b)
Generated 2/21/2005 9:20 AM Page 1 of 2
Comments
OBb
OBc
8300.00 60.91 21.60 4408.13 4485.93 6166.83 6363.69 6229.22 443.83 2.00 180.00G -2.00 0.00 5984530.60 583613.03 N 70.36769344 W 149.32057673
OBd 8383.92 59.23 21.60 4450.00 4527.80 6231.86 6436.41 6296.84 470.61 2.00 180.00G -2.00 0.00 5984598.51 583639.04 N 70.36787817 W 149.32035918
8400.00 58.91 21.60 4458.26 4536.06 6244.19 6450.21 6309.66 475.68 2.00 180.00G -2.00 0.00 5984611.39 583643.98 N 70.36791320 W 149.32031792
8500.00 56.91 21.60 4511.39 4589.19 6319.94 6534.92 6388.43 506.87 2.00 180.00G -2.00 0.00 5984690.49 583674.28 N 70.36812838 W 149.32006450
OBe 8551.69 55.87 21.60 4540.00 4617.80 6358.43 6577.97 6428.45 522.72 2.00 180.00G -2.00 0.00 5984730.69 583689.68 N 70.36823772 W 149.31993571
8600.00 54.91 21.60 4567.44 4645.24 6393.99 6617.73 6465.42 537.35 2.00 180.00G -2.00 0.00 5984767.81 583703.91 N 70.36833871 W 149.31_
OBr 8613.11 54.65 21.60 4575.00 4652.80 6403.56 6628.45 6475.38 541.30 2.00 180.00G -2.00 0.00 5984777.82 583707.74 N 70.36836592 W 149.319
OBr Base 8697.78 52.95 21.60 4625.00 4702.80 6464.65 6696.76 6538.90 566.44 2.00 180.00G -2.00 0.00 5984841.60 583732.18 N 70.36853945 W 149.31958035
8700.00 52.91 21.60 4626.34 4704.14 6466.24 6698.54 6540.55 567.10 2.00 180.00G -2.00 0.00 5984843.26 583732.81 N 70.36854396 W 149.31957504
-8800.00 50.91 21.60 4688.03 4765.83 6536.61 6777.24 6613.72 596.07 2.00 180.00G -2.00 0.00 5984916.74 583760.97 N 70.36874385 W 149.31933960
TD / 7" Csg 8803.12 50.85 21.60 4690.00 4767.80 6538.77 6779.66 6615.98 596.96 2.00 O.OOG -2.00 0.00 5984919.01 583761.83 N 70.36875000 W 149.31933235
Leaal Description:
Northin!! (VI IftUSl Eastina (XI IftUSl
Surface: 2575 FSL 3676 FEL S34 T12N R11E UM 5978297.43 583238.45
Fault Target: 1741 FSL3901 FELS27T12NR11EUM 5982740.00 582955.00
Target: 3334 FSL 3296 FEL S27 T12N R11E UM 5984340.00 583540.00
BHL: 3911 FSL 3066 FEL S27 T12N R11E UM 5984919.01 583761.83
.
WellDesign Ver 3.1 RT-SP3.03-HF5.00 Bld( do31 rt-546 )
L-212\Plan L-212 (N-O)\Plan L-212\L-212 (P6b)
Generated 2/21/20059:20 AM Page 2 of 2
£
Õ 3500
0
I!)
-2
'=-
~
II
Q)
(ij
u
(J)
0
~ 4000
L-212 (P6b)
FIELD
Prudhoe Bay Unit - WOA
STRUCWRE L-PAD
MagneticParamaters
Model: BGGM 2004
Surface Loœ~on
February 15,2005 Lat: N70212A33
57603.5nT Lon W1491927.0S8
NAD27 Alaska State Planes, Zone 04, US Faet
Northing: 5978297.43ftUS GridConv: +0.63646655"
Ea$ling 583238ASftUS SCala Fact: 0.9999078707
Miscellaneous
Slot L-212
Plan l.212 (P6b)
Dip 80.810'
Mag Dec' +24.579'
TVDRef: Rotary Table (77.80ft abOve MSL}
SrvyDate: Jðnuary07,200S
2500
3000
3500
4000
4500
5000
5500
6000
6500
2500
rY K
18" Csg PI
>-
>~~------- ---
/~ -- ----
IJ' ~ -- -------
-------
~Crv4l100 -------
L-212 Fit Tgt -
~ ---
~ .>
~~
MOl ........
MD" ...........
MC .......
........
Nc ............... /L-212 Tgt
OA ..........
OBb ........
OBd "'"
nR' "-
OB' Base . ),"-
/'
¡ TD/7"Csg
L-212 06~)
5000
2500
.
3000
3000
3500
-212PB1 (P7)
4000
e
4500
4500
5000
2500
3000
3500 4000 4500 5000 5500
Vertical Section (ft) Azim = 355°, Scale = 1(in):500(ft) Origin = 0 N/-S. 0 E/-W
6000
6500
.
WELL
L-212 (P6b)
FIELD
Prudhoe Bay Unit - WOA
STRUCTURE L-PAD
Magneti<;Parameters
Model: BGGM 2Q04
Dale: February15.2005
FS' 57603.5nT
Surfaœlocation
Lat: N70212.433
Lon: W1491927.058
NAD27 Alaska State Planes, Zone 04. US feet
Northing .5978297.43ftUS GridConv: +0.63646655"
Easling: 583238.45ftUS Scale Fact: 0.9999078707
TVD Ref: Rotary Table (77.80 ft above MSl)
SrvyDate: January07,2005
Dip: 80.810"
MagDec' +24.579"
-1200
-600
6600
".",...".-""".
6000
5400
'" ""'^^'UH''''-.«
.
mberger
Slot:
po,
L-212
l-212 (Ptib)
o
600
1200
~:2:.T0rth Hardline
6600
l-212 (P6b)
"I'
6000
:N
5400
^
^
^
z 4800 4800
£ End Crv
Õ
0
<D
~
~ l-212 FltTgl
II
Q)
ro 4200
u 4200
CI) Crv 41100
CI)
V
V
V
3600
3000
3600
Fault Crossing
3000
2400
-1200
2400
( 7)
-600 0
<<< W Scale = 1 (in):600(ft) E >>>
1200
600
Plan L-212 (N-O)/Plan L-212
e 0
\500
3000
4-500
. SOOO
1500
qOOO
s<0<0
---"
<0
<5:;
",-SDD <::/ 0
,-...(""\.. "-
Plan L-212 (N-O) (Plan L-212P!H7- Plan L-212
""---0>...5::
....--- é?O
~Q
---Q C/o
~
C/
~
<0
~
Cb
~~
.
.
Oilfield Services, Alaska
Schlumberger Drilling & Measurements
Schlumbøpgøp
2525 Gambell, Suite 400
Anchorage, AK 99503
Tel (907) 273-1766
Fax (907) 561-8367
Monday, February 21, 2005
Mik Triolo
Prudhoe Bay L-212PB1 (P8b)
BP Exploration Alaska Nabors 9ES
Close Approach Analysis
We have examined the potential intersections of subject well with all other potentially conflicting wells, according to
the BPA Directional Survey handbook (BPA-D-004) dated 09/99.
Method of analysis:
1. A list of wells to be analyzed is created in Compass by performing a global scan with an initial search radius of
two thousand feet with an increment of one hundred feet for every one thousand feet of measured depth in the
subject well.
2. Wells are analyzed using the Compass Anti-collision module (BP Company setup) with major risk safety
factors applied. For problem wells that are plugged and abandoned or that can be shut in, risk-based safety factor
may be used, with client notification.
3. All depths are relative to the planned well profile.
Survey Proqram:
Instrument Type
MWD + IFR + MS
MWD + IFR + MS
Start Depth
28.50'md
4,160.65'md
End Depth
4,160.65'md
8,803.12'md
Close Approach Analysis results:
Under method (2), all wells may flow.
All data documenting these procedures is available for inspection at the Drilling & Measurements Directional
Planning Center.
Close Approach Drillinq Aids to be provided:
A drilling map and traveling cylinder will be provided.
Checked by:
Scott Delapp 02/21/05
.
BP Alaska
Anticollision Report
.
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method:. MD + Stations Interval: 50.00 ft
Depth Range: 4160.65 to 8803.12 ft
Maximum Radius: 10000.00 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive WelIpath
Date: 11/22/2004 Validated: No
Planned From To Survey
ft ft
28.50 4160.65 Planned: Plan #8 V1 (0)
4160.65 8803.12 Planned: Plan #6 V1
Version: 8
Toolcode
Tool Name
MWD+IFR+MS
MWD+IFR+MS
MWD + IFR + Multi Station
MWD + IFR + Multi Station
Casing Points
PB L Pad L-01 L-01 V14 Out of range
PB L Pad L-02 L-02 V1 4214.40 6600.00 4222.32 81.83 4140.49 Pass: Major Risk
PB L Pad L-02 L-02PB1 V21 4214.40 6600.00 4222.32 81.86 4140.46 Pass: Major Risk
PB L Pad L-02 Plan L-02A V3 Plan: PI 4198.51 6500.00 4014.93 95.14 3919.80 Pass: Major Risk
PB L Pad L-101 L-101 V4 4200.36 5750.00 3097.69 84.75 3012.95 Pass: Major Risk
PB L Pad L-102 L-102 V2 Out of range
PB L Pad L-102 L-102PB1 V10 Out of range
PB L Pad L-102 L-102PB2 V2 Out of range
PB L Pad L-103 L-103 V23 Out of range
PB L Pad L-104 L-104 V7 Out of range
PB L Pad L-105 L-105 V4 Out of range
PB L Pad L-106 L-106 V14 Out of range
PB L Pad L-107 L-107 V14 Out of range
PB L Pad L-108 L-108 V18 Out of range
PB L Pad L-109 L-109 V12 Out of range
PB L Pad L-110 L-110 V11 Out of range
PB L Pad L-111 L-111 V24 Out of range
PB L Pad L-112 L-112 V8 4207.52 7300.00 5223.79 124.83 5098.96 Pass: Major Risk
PB L Pad L-114 L-114 V15 4219.99 7100.00 4732.45 100.29 4632.16 Pass: Major Risk
PB L Pad L-114 Plan L-114A V1 Plan: P 4213.96 7000.00 4574.18 101.92 4472.26 Pass: Major Risk
PB L Pad L-115 L-115 V7 4230.17 5150.00 2187.96 88.13 2099.82 Pass: Major Risk
PB L Pad L-116 L-116 V10 4217.05 6350.00 3877.55 62.62 3814.93 Pass: Major Risk
PB L Pad L-117 L-117V11 4183.89 4400.00 681.93 61.37 620.55 Pass: Major Risk
PB L Pad L-118 L-118 V9 4210.86 4550.00 1177.34 100.77 1076.57 Pass: Major Risk
PB L Pad L-119 L-119V9 4202.23 5200.00 2417.41 104.21 2313.20 Pass: Major Risk
PB L Pad L-120 L-120 V8 4195.67 7200.00 5128.97 111.85 5017.12 Pass: Major Risk
PB L Pad L-121 L-121 V14 Out of range
PB L Pad L-121 L-121A V1 Out of range
PB L Pad L-122 L-122 V5 4196.70 6300.00 4142.81 126.37 4016.44 Pass: Major Risk
PB L Pad L -200 L-200 V7 7049.77 7800.00 568.23 93.14 475.10 Pass: Major Risk
PB L Pad L-200 L-200L 1 V3 7049.91 7900.00 455.96 107.40 348.56 Pass: Major Risk
PB L Pad L-200 L-200L2 V6 7039.88 7900.00 451.57 110.35 341.21 Pass: Major Risk
PB L Pad L-201 L-201 V6 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-201 L-201 L 1 V9 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-201 L-201L 1PB1 V10 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-201 L-201 L2 V5 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-201 L-201 L3 V2 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-201 L-201L3PB1 V6 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-201 L-201 PB1 V12 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-201 L-201 PB2 V3 4178.38 4450.00 1369.52 99.16 1270.36 Pass: Major Risk
PB L Pad L-210 L-210 V6 Out of range
PB L Pad L-210 L-210PB1 V8 4164.27 9350.00 7606.34 124.10 7482.25 Pass: Major Risk
PB L Pad L-211 L-211 V6 4193.00 4500.00 1352.05 128.02 1224.02 Pass: Major Risk
.
BP Alaska
Anticollision Report
.
PB L Pad L-211 L-211PB1 V6 4191.14 4500.00 1357.11 129.11 1228.00 Pass: Major Risk
PB L Pad L-216 L-216 V6 4186.34 4550.00 1638.26 110.90 1527.36 Pass: Major Risk
PB L Pad NWE1-01 L-100 V2 Out of range
PB L Pad NWE1-01 NWE1-01 V5 Out of range
PB L Pad Plan L-03 (8-0) Plan L-03 V3 Plan: Pia Out of range
PB L Pad Plan L-113 (N-B) Plan L-113 V5 Plan: PI 4203.04 7600.00 5712.37 128.30 5584.07 Pass: Major Risk
PB L Pad Plan L-123 (8-U) Plan L-123 V3 Plan: PI 4205.57 8600.00 6253.04 124.00 6129.03 Pass: Major Risk
PB L Pad Plan L-124 (N-C) Plan L-124 V5 Plan: PI 4169.51 4300.00 758.19 86.48 671.71 Pass: Major Risk
PB L Pad Plan L-124 (N-C) Plan L-124PB1 V2 Plan: 4169.51 4300.00 758.19 86.48 671.71 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202 V1 Plan: PI 4166.97 4500.00 927.28 106.13 821.14 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202L 1 OBb V3 PI 4166.97 4500.00 927.28 106.23 821.05 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202L2 OBa V3 PI 4166.97 4500.00 927.28 106.23 821.05 Pass: Major Risk
PB L Pad Plan L-202 (N-N) Plan L-202L3 OA V3 Pia 4166.97 4500.00 927.28 106.23 821.05 Pass: Major Risk
PB L Pad Plan L-203 (N-Q) Plan L-203 V4 Plan: PI 13160.07 5450.00 3042.25 198.50 2843.75 Pass: Major Risk
PB L Pad Plan L-212 (N-O) Plan L-212PB1 V4 Plan: 4199.98 4200.00 0.91 16.55 -15.64 FAIL: Minor 1/200
.
.
Field: Prudhoe Bay
Site: PB L Pad
Well: Plan L-212 (N-O)
Wellpath: Plan L-212
0
180
Travelling Cylinder Azimuth (TFO+AZI) fdeg] vs Centre to Centre Separation [tOOft/in
27'
-294
200
00
-0
00
200
L...-294
Target: L-212 Tgt Sch
Site: PB L Pad I
Drilling Target Conf.: %
Description:
Map Northing: 5984340.00 ft
Map Easting : 583540.00 ft
Latitude: 70022'01.830N
Shape: Circle
.well: Plan L-212 (N-O)
Based on: Planned Program
Vertical Depth: 4305.00 ft below Mean Sea Level
Local +N/-S: 6039.40 ft
Local +E/-W: 368.69 ft
Longitude: 149°19'16.274W
Radius: 150 ft
o
o 0
o 0 ~
o 0 J )
o ~ J
r J
J
CJ
CJ
N
CJ
CJ
(í)
4-00
5300
5200
5100
5000
5900
5800
CJ
CJ
J
CJ
CJ
LD
CJ
CJ
I
CJ
CJ
Ln
L-111i . · N-A (NWE-2) LEGEND
· L-113 -+ AS-BUILT CONDUCTOR
L-114. · L-124
L-SD · · L-112i . EXISTING CONDUCTOR
· L-02
L-121.
· L-122
L-110. · L-211i
L-SI · .L-115i
L-116 . .L-117
L-109 . .L-118
L-SL ·
L-01 · ::i: L-200
L-107 . I SKlD502 L-202
L-03 · L-212i
L-213i. ~~
L-108i. · L-216i
L-105i. · L-103i
L-106 .
· L-201
L-104. · L-119i
s-w · · L-21Oi
L-102. D~ · L-120
I
-~L
I
PLANT
--LIS'OO'OO"
GRID
L-PAD
.
~
~
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERL Y REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF AUGUST 3.. 2004.
NOTES
1. DATE OF SURVEY: AUGUST 3, 2004.
2. REFERENCE FIELD BOOK: W004-11 PAGES 37-40.
3. ALASKA STATE PLANE COORDINATES ARE ZONE 4,
NAD 27. GEODETIC POSITIONS ARE NAD 27.
4. BASIS OF HORIZONTAL LOCATION IS L-PAD OPERATOR
MONUMENTATION.
5. BASIS OF ELEVATION IS L-PAD OPERATOR MONUMENTS.
ELEVATIONS ARE BP MSL DATUM.
6. MEAN PAD SCALE FACTOR IS 0.999907827.
LOCA TED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA
WELL A.s.P. PLANT GEODETIC GEODETIC CELLAR SECTION
NO. COORDINATES COORDINATES POSITION(DMS) POSITION D.DD BOX ELEV. OFFSETS
y= 5,978,293.25 N= 9999.72 70'21'02.394" 70.3506650' ,2,572' FSL
L-202 X= 583,223.80 E= 5,234.92 -149'19'27.488" -149.3243022' 48.8 3,690' FEL
y= 5,978,297.43 N= 9,999.96 70'21'02.433" 70.3506758' 2,575' FSL
L-212i X= 583,238.45 E= 5,250.15 -149'19'27.058" -149.3241828' 49.3 3,676' FEL
~rn]~' DRAWN: ObP
ONEIL
CHECKED, AlliSON
DATE: 8/03/04
DRAWING: GPB WOA L-PAD SHEET:
FRB04 WOL 06-00
~ [i]~ð)illœo JOB NO:
SCALE: AS-BUlL T CONDUCTORS
06030 ISSUED FOR INFQRMA l10N tAlO RFA ENGlNEERSANDLÞHDSUR\'£YORS WELLS L-202 & L-212i 1 OF 1
80111(51 FlREWEED l.AHE 1"= 150'
NO. OATE REVISION BY Cl-U< ANOfOR¡t,G[, A\.ASI(A 99503
TERRI~ I. HUBBLE
BP EXPLÖRATIÖNAKINC
PO BOX 196612 MB 7-5
ANCHORAGE, AK 99519-6612
89-6/1252
181
"Màstercard Check"
~~~~~cç
First National Bank Alaska
An'''''.a~e,.^K99~OI --0.- .. . )1(.. ~
MEMO 1.-... 2..\ ~ .. hL..{. .
DATE D~·;:<'3..bS
1·~~m.DO
DOLLARS
..
I: ¡. 25 2000bOI:Qq¡......q; 2 2 7"'¡' 5 SbU· O¡'B ¡.
.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERJP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME /¿Ú
,
I
¿-2./2¡
PTD# .20,5-03 C5
Exploration
Stratigraphic
Development
X Service
CHECK WHAT ADD-ONS "CLUE"·
APPLIES (OPTIONS)
MULTI The permit is for a new weUbore ·segment of
LA TERAL existing well .
Permit No, API No. .
(If APJ number Production. should continue to be reponed as
last two. (2) digits a function· of the original API Dumber. stated
are between 60-69) above.
..
PD..OT BOLE In accordance with" 20 AAC 25.005(1), all
(PH) records, data and logs acquired .for the pilot
hole must be dearly differentiated In both
name (name on permit plus PH)
.. and APJ Dumber (50 -
70/80) from records, data and logs acquired
for well (name OD permit).
SPACING The permit is approved subject ·to fuD
EXCEPTION compliance with 20 AAC 25..0S5~ Approval to
perforate and produce is cODtingeDt UpoD
issuance of ~ conservatioD order approviDg a
spa cing ex cep1ioD.
(Companv Name) assumes tbe liability of aDY
protest to the spacing .~JCeptioD tbat may
occur.
:
DRY DITCH AU dry ditcb sample sets submitted to tbe
SAMPLE Commission must be in DO greater 1baD 30'
." sample intervals from below the permafrost
or from wbere samples are first caught aDd
] 0' sample iDter:va)s through target zones.
..
Program SER __ Well bore seg 0
On/Off Shore .O~ Annular Disposal 0
.
.
Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN ORIN L-2121
PLORATION (ALASKA) INC Initial Classffype SERL1WINJ GeoArea Unit
-
Administration P~rmit fee attache~. . - - - - ........ Yes.. - - - - -
2 .Leas~ .number .apRrORriate. . . · Yj'¡s.
3 .U.nlq\Je welt n_amj'¡ _aod oumb_er . . . _ . . _ . _ _ . _ . _ . . . . . . _ . . _ _ _.. _.. - - Yj'¡s_ __ - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - -
4 Well IQcat~d ina. d_efine~ppol. . Yes_ .
5 WelUQcated prpper ~lsta!1ce_ from driJling unitbound_ary_ Yes_
6 Well JQcat~d prpper ~lstance_ from ctber wells . _ Yes
7 Sµfficient acreaQ.e _ayailable in dJilJioQ. unit. . Yes_
8 Jtdeviated, js. weJlbQre plaUncJu.ded . Yes _
9 .O-perator only: affected party _ Yes _ - - - - - -
10 .O-perator bas_apprppriate.b.ond lnJQrce . . _ _ _ . . . . _ . _ _ _ . . . . _ _ . _ _ _.... Y_eL._ - - - . - - - - - - - - - - - - - - - - - - - - - - - - --
11 Permit c.an be tssued without conservation order · Yj'¡s - - - -
Appr Date 12 Permit c.ao be issued wit/JQut ad.ministratil,le_apprpvaJ . · Yj'¡s.. - - - - - -
RPC 2/24/2005 13 Can permit be approved before 15-day wait Yes
14 WelllQcated wtthin area and. strata .authQrtzed bylojectipo Ord~r # (PuUO# inC9mm~nts)(foL Yes. . AI02A - - - - - -
15 .All welJs. within Jl4_mite_areà_of reyieW ideottfied (Fpr s.ervi~ -"....ell only:L _ _ _ _ _ _ _ _ _ . _ _ Yj'¡s_ _. 1,-200_ . . . _ _ _ . _ . _ . _ _ _ _ . . _ _ _ _ _ _ _ _ _
16 PJE~-produ.ced iojector; ~uratjQnof pre--pro.ductipo less. th.m 3 mOnths. (fQLSer:vi.ce well Qnly) No_ - - - - - - - - - - -
17 ACMP Finding 9f CQn$tsteocy.has been is.s\Jed_ for tbis project NA _ - - - - - - - - - -
--.
Engineering 18 .Cooductor $t(Îng.pJovided - - - - - - - - Yes 2Q"x34"@JOS'.. . - - - - - -
19 .Surfacecasing.pJotects. all known USQWs _ _ . _ - - - - - Yes
20 CMT v.ol adequate. to circ.utate on conductor_ 8. $UJtcsg . Y.es AdeJ:uate exces.s, _ .
21 .CMTyol adeQuateJo tie-tnlQng .string to.surf cs.g_ _ . No - - - - -
22 .CMT will coyer.all Koownproductiye bQrizons_ Yes
23 .Casiog de.signs adequa.te fpr C,T, B .&. Rermafwst _ . Yes
24 .A.dequateJankageoJ re_Ser:ve pit. Yes Nabors.9.ES. .
25 JtaJe-drilt has.a tO~403 for abandonme.nt beeo apPJQved . NA New well,
26 A.dequate_wellbore separatio_n-pro-pose.d _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
27 Jtdivecter Jeq.uiJed, does it meet reguJations. _ - - - - - Yes - - - -
Appr Date 28 DJilIiog fluid Rrogram sc.hematic& eq.uip Jistadequate _ _ Yes Max MW.1P,2ppg.. - - - - - -
WGA 2/25/2005 29 .B.OPE::s,.do .they meet n'!guJatioo _Yes - - - - -
30 B..OPE::pre.ss ratiog ap-propriate; .test to (pu_t psig tn .commeots) . . Yes T e.st tp 40QO. Rsi.I\lISP 27.60 psi..
31 .Choke. manifold compJies. w/API RF>-53 (May 84) _ _ Yes
32 Work will OGcur withoutoperation .shutdown_ _ _ _ . Yj'¡s - - - - -
33 Js. pres.ence Qf H2S gas_ prob.able. . No_ NQLan H2S pad. . .
34 Meçhantcatcoodiltoo p{ wells wtthin AOR yerifíed (Fpr. s_ervice well only) Yj'¡s Cmtng re.cords indicate m¡ach. iotegrtty: of AORweJ
~
Geology 35 Permit can be tssued w/o hydrogen s.ulfide meas_ures. . . Yes
36 D_ata.PJes¡aoted on pote_ntial pveJRres.sur¡a .zoneJ>. . - - - - NA
Appr Date 37 Seismic_analysis. of J>baJlow gas.zones. . NA
- - - - - - - - - - - -
RPC 2/24/2005 38 .S.eabed .cOndjtipo survey (if off-shore) . . NA
39 _ Contact nam.elphoneJor.weekly prpgress.reRorts [explorç¡tory .only). NA
-
Geologic Date: Engineering Date
Commissioner: Commissioner:
JJ& <.. ( 2.S )ú