Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
183-148
RECEIVED • • JUL 31 2017 STATE OF ALASKA AOGC ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil❑ Gas❑ SPLUG❑ Other ❑ Abandoned E ' Suspended ❑ lb.Well Class: 20AAC 25.105 20MC 25.»0 Development E Exploratory❑ GINJ ❑ WINJ❑ WAGE] WDSPL❑ No.of Completions: Service ❑ Stratigraphic Test❑ 2.Operator Name: 6.Date Comp.,Susp.,or 14.Permit to Drill Number/ Sundry: ConocoPhillips Alaska,Inc. Aband.: 6/2/2017 183-148/317-158 3.Address: 7.Date Spudded: 15.API Number: P.O.Box 100360 Anchorage,AK 99510-0360 10/21/1983 50-029-21024-00 4a. Location of Well(Governmental Section): 8.Date TD Reached: 16.Well Name and Number: Surface: 4971'FNL,4839'FEL,Sec 29,T12N, R10E, UM 10/26/1983 KRU 1G-15/317-158 Top of Productive Interval: 9. Ref Elevations: KB:97 17. Field/Pool(s): 4314'FNL,925'FEL Sec 30,T12N, R10E,UM GL:56 BF: Kuparuk River Field/Kupark Oil Poole Total Depth: 10.Plug Back Depth MD/TVD: 18. Property Designation: 1144'FSL, 1243'FEL,Sec 30,T12N R10E,UM 7017/6519 , ADL 25640 4b.Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 540221 y- 5980956 Zone- 4 7533/6963 ' 931813000 TPI: x- 538849 y- 5981606 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/IVD: Total Depth: x- 538530 y- 5981782 Zone- 4 N/A 1642/1642 5.Directional or Inclination Survey: Yes 0 (attached) No ❑ 13.Water Depth, if Offshore: 21.Re-drill/Lateral Top Window MDITVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include, but are not limited to:mud log,spontaneous potential, gamma ray,caliper, resistivity,porosity, magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary N/A SCANNED AUG 0 8 2017, 23. CASING, LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD FT. PULLED 16 62.5 H-40 Surf 114 Surf 114 24 212 sx CS II 10 3/4 45.5/55.5 J-55/L-80 Surf 2200 Surf 2200 13 1/2 1100 sx Permafrost E&250 sx Permafrost C 7 26 J-55 Surf 7502 Surf 6935 8 1/2 750 sx Class G&250sx Permafrost C 24.Open to production or injection? Yes ❑ No 2 25.TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number; Date Perfd): 4 1/2 x 3.5 7116 5671/5384 RFFR/R1 9R all perfs plugged 6•4.w ep 6670/6222 !.u _ r-4-C 7086/6578 --we!-.8%._ 26.ACID, FRACTURE,CEMENT SQUEEZE, ETC. (a/L ir Was hydraulic fracturing used during completion? Yes❑ No El Per 20 AAC 25.283(i)(2)attach electronic and printed information C` DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 6750-7085 30 bbls cement, 15 bbls wCemnet Fiber 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): N/A PLUGGED BACK Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period - Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate /7/14 803/1?.. VT` Pill/I 7- )7-/17 Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 RBDMS Lv Awls - 1 2017 Submit ORIGINIAL • • 28.CORE DATA Conventional Core(s): Yes ❑ No Q Sidewall Cores: Yes ❑ No El If Yes, list formations and intervals cored(MD/TVD, From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well tested? Yes ❑ No 0 Permafrost-Top Surface Surface If yes, list intervals and formations tested,briefly summarizing test results. Permafrost-Base 1642 1642 Attach separate pages to this form, if needed,and submit detailed test Top of Productive Interval N/A N/A information, including reports,per 20 AAC 25.071. Formation @ TPI-Kuparuk C TD N/A N/A Formation at total depth: N/A 31. List of Attachments: Daily Operations Summary,Schematics Information to be attached includes, but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological reoort. production or well test results.per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: J.Ohlinger Contact Name: William Lonq A 263-437�P��.//l� Authorized Title: Staff CTD Engineer Contact Email: William.R.Long(a)cop.com Authorized /..r0 Contact Phone: 265-1102 Signature: / Date: „0.000.6 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing,Ground Level,and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. perfs squeezed The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 19: Report the Division of Oil&Gas/Division of Mining Land and Water:Plan of Operations(LO/Region YY-123), Land Use Permit(LAS 12345), and/or Easement(ADL 123456)number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and ND for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional intencal to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips, photographs,and all subsequent laboratory analytical results,including, but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including, but not limited to:core analysis,paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only • • 1 G-15 DTTMST/JOBTYP SUMMARYOPS 5/31/17 DRILLING MIRU, install one swab configuration below stack, peform initial BOPE test, perform slack SIDETRACK management 212', trim 1,200' of coil 6/1/17 DRILLING Install CTC, Re-head BHI UQ, MU BHA# 1, Run Dummy WS to 7,090', Set TOWS 7,033', SIDETRACK reconfigure well head 6/2/17 DRILLING Finish re-config of well head components, PU/MU/RIH mill dual string exit first run of two. SIDETRACK 6/3/17 DRILLING Continue IH, Mill second stage of dual string exit w/1.25° bend WFT motor and string reamer SIDETRACK from 7,039' to 7,058', POOH, PU "A" Lateral BHA#5, Drill build section as per plan from 7,058' to 7,238', getting low DLG's discuss with town team, ok'd to go up to 30' lower then plan. 6/4/17 DRILLING Drilled build section to TD 7,360', POOH, PUD build section BHA#5, PU/MU/PD drilling SIDETRACK BHA, RIH, Drilled from 7,360' to 8,200', unable to build angle, POOH for higher ako motor, PUD BHA#6, PD "A" lateral drilling BHA#7 w/X-treme motor and agitator. 6/5/17 DRILLING PD, Lateral drilling BHA#7, RIH, log HRZ, drill ahead from 8,200' to 8,668'. Setting down SIDETRACK 7,130', 7,896', 8,030', and 8,156'. work pipe down by lowering pump rate, and PUH to breakover. 6/6/17 DRILLING Wiper back in hole from 8,583', BOBD 8,668' drilled ahead to 8240'. Pumped 5x5 sweeps SIDETRACK and POOH to 3550'. RBIH and drill from 8240' to 9045'. ROP's 30-7 ft/hr. 6/7/17 DRILLING Drill from 9044' to 9150'. Cross fault at 9000' and require Cl pay. Pump sweeps and POOH SIDETRACK while swapping to new mud system. PUD & LD A lat drilling BHA. Perform BOPE function test. PU & PD BHA#8, open hole anchored billet and RIH. Unable to pas 7103'. POOH for clean out assembly. 6/8/17 DRILLING Continua to POOH with open hole billet. PUD and LD BHA#8. PU & PD BHA#9, clean out SIDETRACK assembly w 1.2 °AKO motor and ridge set gauge mill. RIH and attempt to clean out A lateral. Set down in multiple areas through out the build section in B sands. Pump sweeps and pull heavy, work pipe and PUH. Clean up area above Whipstock and window. POOH, PUD and LD BHA#9. PU & PD BHA#10 4.5"Whipstock, RIH, tie into HRZ and set TOW @ 7018' HS. POOH, PUD & LD BHA#10. PU & PD BHA#11, A lat 3.5"window milling assembly. 6/9/17 DRILLING RIH w BHA#11, 4.5"window milling assembly. Dry tag TOW @ 7018' and mill 2.80" exit SIDETRACK window in 4.5"tubing to 7026.6'. Back ream window area and dry drift, clean. POOH, PUD & LD BHA#11. PU & PD BHA#12, Weatherford 1.6°AKO motor& rat radius window mill. RIH and mill 2.80" exit window in 7" casing. Back ream, dry drift. Clean when traversed > 25 ft/min 6/10/17 DRILLING Pump sweeps & chase out of hole. PUD & LD BHA#12. Jet stack. PU & PD BHA#13, A lat SIDETRACK build drilling assembly, 2.6°AKO motor. RIH and drill build from 7033'-7215'. POOH Chasing sweeps to surface. PUD & LD BHA#13. PU & PD BHA#14, A lat drilling assembly, Weatherford 0.7°AKO motor w NOV agitator. RIH and drill A lat from 7215'-7782'. 6/11/17 DRILLING Wiper trip and tie into the RA tag for no correction. RBIH and drill from 7782'-8858'. SIDETRACK Encounter partial loses @ 7782' that slowly healed then grew to 90%. Shut in choke @ 8181' and drilled ahead on a closed choke. Swapped mud system to Power pro light. ( 1,900 bbls lost @ midnight) 6/12/17 DRILLING Drilled ahead from 8858' to 9050'. POOH to inspect BHA. Laid in Ultra Hi-Vis pill while SIDETRACK POOH with little effect on loss rate. PUD, LD BHA#15, Bit graded 4/1. PU & PD BHA#15, W fresh 0.75 °AKO Weatherford motor below an NOV agitator. RBIH and drill from 9050 to midnight depth of 8192' with a closed choke. ( 3,000 bbls total lost @ midnight) • S ' ' ,r Operations Summary (with Timelog Depths) .,-44-,,*; 1G-15 Conocc*hillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log , Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (5KB) End Depth(ftKB) 5/30/2017 5/30/2017 6.00 MIRU MOVE MOB P Jack up/Move to 1G-pad 0.0 0.0 12:00 18:00 5/30/2017 5/30/2017 2.00 MIRU MOVE MOB P RU tree and configure single swab 0.0 0.0 18:00 20:00 setup,secure cellar floor. 5/30/2017 5/30/2017 1.50 MIRU MOVE MOB P Spot Sub Module,and lower stack 0.0 0.0 20:00 21:30 5/30/2017 5/31/2017 2.50 MIRU MOVE MOB P PJSM,Spot Pit Sub,became stuck in 0.0 0.0 21:30 00:00 middle of pad,call for additional dozer support,back pit module up dress pad,lay plywood on outside premiter, second dozer on location,spot in Pit Module. 5/31/2017 5/31/2017 1.00 MIRU MOVE MOB P Finish spotting in Pit Module.PU 0.0 0.0 00:00 01:00 plywood,work on post rig move checklist. 5/31/2017 5/31/2017 8.00 MIRU MOVE MOB P Tighten Tree and BOP bolts,secure 0.0 0.0 01:00 09:00 stack,install tango valves,RU MP line,perform post move checklist, changeout risers,grease all surface valves,valve crew serviced wellhead 5/31/2017 5/31/2017 9.50 MIRU WHDBOP BOPE P Start initial full BOPE test,250 psi 0.0 0.0 09:00 18:30 low/3,800 psi high,fail pass on R2,• Lower blind shear ram Fail,Test witness waived by Guy Cook, AOGCC,RIG ACCEPT,fluid pack stack,good shell test,re-test lower blind shear rams good test. 5/31/2017 5/31/2017 1.50 MIRU WHDBOP CTOP P PJSM,fluid pack stack,shell test, re- 0.0 0.0 18:30 20:00 test lower blind shear rams,stab INJH,test inner reel valve and stripper good tests 5/31/2017 5/31/2017 1.00 MIRU RIGMNT CTOP P Perform slack management,bring 0.0 0.0 20:00 21:00 pumps 1 &2 up to 2.2 bpm @ 4,100 psi,heard wire move,shut down pump,restarted heard wire move again,shut down,restart no movement,shut down pump,bleed pump pressure off,unstab INJH 5/31/2017 6/1/2017 3.00 MIRU RIGMNT CTOP P PJSM, RU rig floor for cutting coil,cut 0.0 0.0 21:00 00:00 coil found wire at 212'.-212'of slack in reel'*'Continue trimming coil, 1,200'of coil cut 6/1/2017 6/1/2017 1.80 MIRU RIGMNT CTOP P Test e-line(good test),Dress and 0.0 0.0 00:00 01:48 Install CTC, Pull Test 35 k. 6/1/2017 6/1/2017 1.80 MIRU RIGMNT CTOP P Rehead BHI UQ,test a-line(good 0.0 0.0 01:48 03:36 test),PT CTC to 4,000 psi,PT tiger tank line,and PDL. 6/1/2017 6/1/2017 0.50 SLOT RIGMNT SFTY P PJSM,Check well for flow(no-flow), 0.0 0.0 03:36 04:06 unstab INJH 6/1/2017 6/1/2017 0.80 SLOT RPEQPT PULD P MU BHA#1 w/dummy WS. 0.0 71.1 04:06 04:54 6/1/2017 6/1/2017 1.50 SLOT RPEQPT TRIP P RIH,pumping 1.5 bpm pumping slack 71.1 6,465.0 04:54 06:24 forward,w/dummy WS 6/1/2017 6/1/2017 0.40 SLOT RPEQPT DLOG P Log HRZ for correction of minus 2.5' 6,465.0 6,535.0 06:24 06:48 6/1/2017 6/1/2017 0.10-SLOT RPEQPT -TRIP P Continue in well 6,535.0 6,648.0 06:48 06:54 6/1/2017 6/1/2017 0.20 SLOT RPEQPT DLOG P Log K1 marker,inconclusive no 6,648.0 6,693.0 06:54 07:06 correction 6/1/2017 6/1/2017 0.10 SLOT RPEQPT TRIP P PUH to make CCL Pass 6,693.0 6,659.0 07:06 07:12 Page 1/37 Report Printed: 7/3/2017 • nt • • Operations Summary (with Timelog Depths) �y : ,u 1G-15 ConocoPhillips ro Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/1/2017 6/1/2017 0.60 SLOT RPEQPT DLOG P Set tool to CCL mode,Log down,set 6,659.0 7,090.0 07:12 07:48 down @ 7090,Sensor depth 7030 6/1/2017 6/1/2017 0.40 SLOT RPEQPT CIRC P Complete swapping coil to milling fluid 7,090.0 7,080.0 07:48 08:12 6/1/2017 6/1/2017 1.20 SLOT RPEQPT TRIP P Trip out displacing to milling fluid 7,080.0 85.0 08:12 09:24 6/1/2017 6/1/2017 0.70 SLOT RPEQPT PULD P Tag up,flow check,back off injector, 85.0 0.0 09:24 10:06 L/D BHA#1 6/1/2017 6/1/2017 0.80 PROD1 WHPST PULD P P/U BHA#2,whipstock with open hole 0.0 74.0 10:06 10:54 anchor,Hook up to coil and surface test.Change out pack offs 6/1/2017 6/1/2017 1.70 PROD1 WHPST TRIP P RIH,EDC open,Min rate 74.0 6,465.0 10:54 12:36 6/1/2017 6/1/2017 0.30 PROD1 WHPST DLOG P Log HRZ for-3'correction 6,465.0 6,505.0 12:36 12:54 • 6/1/2017 6/1/2017 0.50 PROD1 WHPST TRIP P Continue in to setting depth, 6,505.0 7,043.0 12:54 13:24 PUW=31 K, Reset on depth,oriented to high side.Close EDC.Pressure up and see tool shift @ 3350 PSI,Set down 3K.Looks good 6/1/2017 6/1/2017 1.30 PROD1 WHPST TRIP P POOH,EDC open 7,043.0 69.0 13:24 14:42 6/1/2017 6/1/2017 0.75 PROD1 WHPST PULD P At surface,PJSM,Lay down tools 69.0 0.0 14:42 15:27 from dead well 6/1/2017 6/1/2017 1.00 PROD1 WHDBOP RURD T PJSM,RU air,blow down surface 0.0 0.0 15:27 16:27 lines,and BOPE 6/1/2017 6/1/2017 2.00 PROD1 WHDBOP RURD T PJSM,Nipple down BOPE and MP 0.0 0.0. 16:27 18:27 line 6/1/2017 6/2/2017 5.55 PROD1 WHDBOP RURD T MU new configuration on cellar floor, 0.0 0.0 18:27 00:00 install single swab setup. 6/2/2017 6/2/2017 5.50 PROD1 WHDBOP RURD T Continue with re-config in cellar. 0.0 0.0 00:00 05:30 Torque all connections,MU MP line 6/2/2017 6/2/2017 3.00 PROD1 'WHDBOP RURD T Fliuid pack surface lines,perform shell 0.0 0.0 05:30 08:30 test.Call ut grease crew to service swab two.Chart test,PT TT line. 6/2/2017 6/2/2017 1.40 PROD1 WHPST PULD P PJSM,P/U BHA#3 window milling 0.0 74.0 08:30 09:54 BHA with.6°motor,2.79 string reamer,and 2.80 dimond window mill. M/U to coil and surface test 6/2/2017 6/2/2017 1.40 PROD1 WHPST TRIP P Trip in well,EDC open,Pumping 74.0 6,460.0 09:54 11:18 6/2/2017 6/2/2017 0.20 PROD1 WHPST DLOG P Log HRZ for-3'correction 6,460.0 6,489.0 11:18 11:30 6/2/2017 6/2/2017 0.30 PROD1 WHPST TRIP P Continue in well,wt chk @ 6988'is 6,489.0 7,032.0 11:30 11:48 33K, Dry tag TOWS @ 7032 6/2/2017 6/2/2017 7.70 PROD1 WHPST 'MILL P 7032',Pumps on @ 1.7 BPM @ 2870 7,032.0 7,039.0 11:48 19:30 PSI FS,BHP=3155.Mill first section of window 7033 to 7039'per procedure 6/2/2017 6/2/2017 0.50 PROD1 WHPST REAM P Ream window exit as per procedure, 7,039.0 7,039.0 19:30 20:00 PUW 30 k/RIW 15 k 6/2/2017 6/2/2017 1.50 PROD1 WHPST TRIP P POOH,pumping 1.8 bpm at 2,490 psi 7,039.0 74.3 20:00 21:30 6/2/2017 6/2/2017 0.50 PROD1 WHPST OWFF P At surface,PJSM,check well for flow 74.3 74.3 21:30 22:00 6/2/2017 6/2/2017 0.50 PROD1 WHPST PULD P LD milling BHA on dead well,mills 74.3 0.0 22:00 22:30 gauged 2.80 go/2.79 no-go. Page 2/37 Report Printed: 7/3/2017 i, • • < Operations Summary (with Timelog Depths) �' 1G-15 conohtft;ps rda:ks Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/2/2017 6/2/2017 0.50 PROD1 WHPST PULD P PU/MU Second milling BHA#4 0.0 76.8 22:30 23:00 6/2/2017 6/3/2017 1.00 PROD1 WHPST TRIP P Tag up,Surface test Coiltrak Tools 76.8 5,000.0 23:00 00:00 (good test),reset counters,start trip sheet,RIH,pumping 0.32 bpm at 632 psi 6/3/2017 6/3/2017 0.25 PROD1 WHPST TRIP P Continue IH 5,000.0 6,444.0 00:00 00:15 6/3/2017 6/3/2017 0.50 PROD1 WHPST DLOG P Log the HRZ correction of minus 3.5', 6,444.0 6,994.0 00:15 00:45 PUW 30 k 6/3/2017 6/3/2017 0.25 PROD1 WHPST TRIP P Continue RIH 6,994.0 7,039.0 00:45 01:00 6/3/2017 6/3/2017 3.40 PROD1 WHPST MILL P Start milling second stage of dual 7,039.0 7,043.0 01:00 04:24 string exit. 1.8 bpm at 3,280 psi,BHP 3,165,WHP 0, IA 415,OA 70 6/3/2017 6/3/2017 4.70 PROD1 WHPST MILL P 7043',Call BOW, 1.8 BPM @ 4105 7,043.0 7,058.0 04:24 09:06 PSi FS,BHP=3850,Mill rathole to 7058 6/3/2017 6/3/2017 2.50 PROD1 WHPST REAM P Start reaming passes,HS,30R,30L, 7,058.0 7,026.0 09:06 11:36 Low side.Dry drift-good,PUW=30K 6/3/2017 6/3/2017 1.30 PROD1 WHPST TRIP P Trip out for build BHA 7,026.0 73.0 11:36 12:54 6/3/2017 6/3/2017 2.00 PROD1 WHPST PULD 'P Tag up,space out,PJSM,PUD BHA 73.0 0.0 12:54 14:54 #4 second window milling run,Mill out of hole @ 2.79 no go 6/3/2017 6/3/2017 1.50 PROD1 DRILL PULD P PJSM,PD BHA#5(Pre Loaded), 0.0 72.2 14:54 16:24 Build BHA with 2.3°AKO motor and reconditioned Hughes Bi Center 6/3/2017 6/3/2017 1.50 PROD1 DRILL TRIP P Trip in hole,EDC open,pumping min 72.2 6,445.0 16:24 17:54 rate 6/3/2017 6/3/2017 0.25 PROD1 DRILL DLOG P Log the HRZ correction of minus 4.0', 6,445.0 6,487.0 17:54 18:09 6/3/2017 6/3/2017 0.50 PROD1 DRILL TRIP P Continue IH,RIW 19 k,PUW 30 k 6,487.0 7,058.0 18:09 18:39 6/3/2017 6/3/2017 1.00 PROD1 DRILL DRLG P OBD, 1.8 bpm at 4,000 psi, BHP 7,058.0 7,109.0 18:39 19:39 3,913,WHP 695,IA 419,OA 73, DHWOB 1.1 k,CTWS 14 k,ROP 8'3 fph 6/3/2017 6/3/2017 0.40 PROD1 DRILL DRLG P i Discuss with town low DLG, 10'lower 7,109.0 7,109.0 19:39 20:03 i then plan,still showing low DLG, talked to town team again,30'lower then plan ok'd by Town Geo. 6/3/2017 6/4/2017 3.95 PROD1 DRILL DRLG P Continue Drilling ahead, 1.8 bpm at 7,109.0 7,238.0 20:03 00:00 3,830 psi,BHP 3,881,WHP 617, IA 426,OA 96 6/4/2017 6/4/2017 3.00 PROD1 DRILL DRLG P OBD,1.8 bpm at 4,060'psi,BHP 7,238.0 7,280.0 00:00 03:00 3,963,WHP 627, IA 428,OA 95, DHWOB 3.5 k,CTSW 11 k,ROP 6 fph 6/4/2017 6/4/2017 2.90 PROD1 DRILL DRLG P OBD, 1.77 bpm at 4,198 psi,BHP 7,280.0 7,360.0 03:00 05:54 3,939,WHP 623,IA 434,OA 94, DHWOB 2.5 k,CTSW 11.6 k,ROP 24 fph 6/4/2017 6/4/2017 1.30 PROD1 DRILL TRIP P Call end of build,trip out,PUW=31K, 7,360.0 63.0 05:54 07:12 Avg DLS=33° 6/4/2017 6/4/2017 1.60 PROD1 DRILL PULD P At surface,Tag up and space out, 63.0 0.0 07:12 08:48 PJSM,PUD BHA#5,Bit balled up, Clay build up on BHA and CTC Page 3/37 Report Printed: 7/3/2017 • • ''"."r4WOperations Summary (with Timelog Depths) i. 1G-15 ConocoPhillips`` Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/4/2017 6/4/2017 1.50 PROD1 DRILL PULD P PJSM,PD BHA#6 lateral BHA with 0.0 80.8 08:48 10:18 RB HYC Bi center,.75+WFT motor, and agitator,Check pack offs,Change floats in UQC,M/U to coil and surface test 6/4/2017 6/4/2017 1.30 PROD1 DRILL TRIP P RIH BHA#6,stop at 300'close EDC 80.8 6,465.0 10:18 11:36 and test agitator.Vibrating on at surface,Open EDC and continue in well 6/4/2017 6/4/2017 0.20 PROD1 DRILL DLOG P Log HRZ for-4'correction 6,465.0 6,488.0 11:36 11:48 6/4/2017 6/4/2017 0.30 PROD1 DRILL TRIP P Continue in well,6988 stop and close 6,488.0 7,070.0 11:48 12:06 EDC,PUW=28.5K 6/4/2017 6/4/2017 0.10 PROD1 DRILL DLOG P Log RA marker @ 7040',TOWS=7033 7,070.0 7,095.0 12:06 12:12 6/4/2017 6/4/2017 0.20 PROD1 DRILL TRIP P Continue in well to bottom, 7,095.0 7,360.0 12:12 12:24 6/4/2017 6/4/2017 3.50 PROD1 DRILL DRLG P 7360',Drill, 1.75 BPM @ 4349 PSI 7,360.0 7,760.0 12:24 15:54 FS,BHP=3895, RIW=10.5K 6/4/2017 6/4/2017 0.50 PROD1 DRILL WPRT P 7760',Wiper trip to 7100,PUW=32K, 7,760.0 7,760.0 15:54 16:24 Clean trip up and down 6/4/2017 6/4/2017 2.50 PROD1 DRILL DRLG P 7760',Drill, 1.7 BPM @ 4660 PSI FS, 7,760.0 8,040.0 16:24 18:54 BHP=4007,WHP=628,RIW=13.3K 6/4/2017 6/4/2017 1.60 PROD1 DRILL DRLG P Having trouble building angle,lower 8,040.0 8,200.0 18:54 20:30 pump rate 1.5 bpm,trough 180° oppostie from DTF,continue drilling ahead without success,pump 5x5 sweep. 6/4/2017 6/4/2017 1.75 PROD1 `DRILL TRIP T POOH,pumping 1.8 bpm at 3,624 psi, 8,200.0 80.8 20:30 22:15 following MPS,filling out trip sheet. 6/4/2017 6/4/2017 1.25 PROD1 DRILL PULD T PJSM,PUD/LD Lateral Drilling BHA# 80.8 0.0 22:15 23:30 6 6/4/2017 6/4/2017 PROD1 DRILL PULD T MU Drilling BHA#7 with BHI motor 0.0 23:30 23:30 and agitator. 6/5/2017 6/5/2017 1.00 PROD1 DRILL PULD T Continue PD,"A"Lateral Drilling 0.0 78.2 00:00 01:00 BHA#7 6/5/2017 6/5/2017 1.50 PROD1 DRILL TRIP T RIH,Lateral Drilling BHA#7(1.2°ako 78.2 6,465.0 01:00 02:30 motor) 6/5/2017 6/5/2017 0.25 PROD1 DRILL DLOG T Log the HRZ correction of minus 4.0' 6,465.0 6,510.0 02:30 02:45 6/5/2017 6/5/2017 0.75 PROD1 DRILL TRIP T Continue RIH to bottom,7,100'close 6,510.0 8,030.0 02:45 03:30 EDC,35 k,set down 7,130',7,896', and 8,030'. 6/5/2017 6/5/2017 0.25 PROD1 DRILL REAM T PUH at 5 fpm back reaming 8,030.0 7,880.0 03:30 03:45 6/5/2017 6/5/2017 0.75 PROD1 DRILL TRIP T RBIH,pumping 1.3 bpm at 3,440 psi, 7,880.0 8,200.0 03:45 04:30 BHP 3,905,WHP 460, IA 400,OA 75, work past 8,156'. 6/5/2017 6/5/2017 1.10 PROD1 DRILL DRLG P BOBD 1.82 bpm at 4,870 psi,BHP 8,200.0 8,268.0 04:30 05:36 3,970,WHP 576,IA 419,OA 76, 6/5/2017 6/5/2017 0.60 PROD1 DRILL WPRT P Pull 400'wiper,PUW=30K 8,268.0 8,268.0 05:36 06:12 6/5/2017 6/5/2017 2.30 PROD1 DRILL DRLG P 8268',Drill, 1.8 BPM @ 4650 PSI FS, 8,268.0 8,367.0 06:12 08:30 BHP=3990 6/5/2017 6/5/2017 0.30 PROD1 DRILL DRLG P 8367 could be fault,started loosing 8,367.0 8,376.0 08:30 08:48 fluid @.2 BBI/Min.Healed up fairly quickly losses stabilized-5 BPM Page 4/37 Report Printed: 7/3/2017 r # `. 0 • .„ . , i,, Operations Summary (with Timelog Depths) tit; z � 1G-15 CortocoPhiiiips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/5/2017 6/5/2017 0.10 PROD1 DRILL WPRT P BHA Wiper trip,PUW=33K 8,376.0 8,376.0 08:48 08:54 6/5/2017 6/5/2017 4.20 PROD1 ' DRILL DRLG P 8376',Drill, 1.8 BPM @ 4650 PSI FS, 8,376.0 8,485.0 08:54 13:06 BHP=3950 6/5/2017 6/5/2017 0.20 PROD1 DRILL WPRT P Pull mini wiper,low ROP—25 FPH, 8,485.0 8,485.0 13:06 13:18 PUW=29K 6/5/2017 6/5/2017 1.30 PROD1 DRILL DRLG P 8485',Drill, 1.8 BPM @ 4540 PSI FS, 8,485.0 8,512.0 13:18 14:36 BHP=3976,Slight losses 6/5/2017 6/5/2017 0.80 PROD1 DRILL WPRT P 8512 pull 1000'wiper,PUW=29K. 8,512.0 8,512.0 14:36 15:24 Better hole conditions,set down @ 8075 and 8240 6/5/2017 6/5/2017 5.70 PROD1 DRILL DRLG P 8512',Drill, 1.8 BPM @ 4582 PSi FS, 8,512.0 8,643.0 15:24 21:06 BHP=3956,Low ROP,RIW=-4K,few pick ups 6/5/2017 6/5/2017 0.20 PROD1 DRILL WPRT P 8643 Mini Wiper,PUW=34K 8,643.0 8,643.0 21:06 21:18 6/5/2017 6/5/2017 1.20 PROD1 DRILL DRLG P 8643',Drill, 1.8 BPM @ 4840 PSI FS, 8,643.0 8,668.0 21:18 22:30 BHP=4010,Possible plugged bit nozzle 6/5/2017 6/5/2017 0.70 PROD1 DRILL WPRT P Wiper up hole,pulled heavy 43 k 8,668.0 7,100.0 22:30 23:12 6/5/2017 6/6/2017 0.80 PROD1 DRILL WPRT P Wiper back in hole,RIW 12 k 7,100.0 8,583.0 23:12 00:00 6/6/2017 6/6/2017 0.10 PROD1 DRILL WPRT P Finished wiper in hole,RIW 9 k 8,583.0 8,668.0 00:00 00:06 6/6/2017 6/6/2017 2.00 PROD1 DRILL DRLG P BOBD 1.8 bpm at 4,711 psi,BHP 8,668.0 8,708.0 00:06 02:06 3,982,WHP 511, IA 437,OA 108, ' DHWOB 2 k,CTSW minus 5 k,ROP 30 fph,pump 24 bbl pill of drill zone, balled up bit suspected. 6/6/2017 6/6/2017 0.12 PROD1 DRILL WPRT P 100 ft wiper up hole PUW 32 k 8,708.0 8,586.0 02:06 02:13 6/6/2017 6/6/2017 0.12 PROD1 DRILL WPRT P Wiper back in hole,RIW 4 k 8,586.0 8,708.0 02:13 02:20 6/6/2017 6/6/2017 2.00 PROD1 DRILL DRLG P BOBD, 1.8 bpm at 4,747 psi,BHP 8,708.0 8,738.0 02:20 04:20 3,949,WHP 513,IA 439,OA 111, DHWOB 1.7 k,CTWS 5 k,ROP 28 fph 6/6/2017 6/6/2017 1.25 PROD1 DRILL DRLG P Pump 20 bbl pill of Alpine beads,drill 8,738.0 8,767.0 04:20 05:35 zone,and flo-vis.OBD 1.8 bpm at 5,129 psi, BHP 4,028,WHP 524,IA 436,OA 111,DHWOB 2.1 k,CTSW 0, ROP 42 fph 6/6/2017 6/6/2017 2.25 PROD1 DRILL TRIP T POOH,pump 5x5 sweep 8,767.0 3,550.0 05:35 07:50 6/6/2017 6/6/2017 0.50 PROD1 DRILL TRIP T Pump 10x10 sweep,RBIH to confirm 3,550.0 6,445.0 07:50 08:20 hole conditions. 6/6/2017 6/6/2017 0.25 PROD1 DRILL DLOG T Log the HRZ correction of plus 7.0' 6,445.0 6,510.0 08:20 08:35 6/6/2017 6/6/2017 0.25 PROD1 DRILL TRIP T Continue RIH,RIW 15 k,close EDC. 6,510.0 7,000.0 08:35 08:50 PUW 28 k 6/6/2017 6/6/2017 0.75 PROD1 DRILL TRIP T Continue RIH clean to 8,350' 7,000.0 8,350.0 08:50 09:35 6/6/2017 6/6/2017 0.12 PROD1 DRILL TRIP T POOH,at 50 fpm pumping 1.8 bpm at 8,350.0 8,240.0 09:35 09:42 4,950 psi,BHP 3970,WHP 548, IA 433,OA 104,clean up 8,240'area. 6/6/2017 6/6/2017 0.25 PROD1 DRILL TRIP T Decision was made to go back drilling, 8,240.0 8,767.0 09:42 09:57 RBIH to bottom Page 5/37 Report Printed: 7/3/2017 • • �` Operations Summary (with Timelog Depths) x 0,,--4., ya+, a. . 1G-15 ifia� . M1l.r.ka Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/6/2017 6/6/2017 5.50 PROD1 DRILL DRLG P BOBD,1.8 bpm at 5,070 psi,BHP 8,767.0 8,903.0 09:57 15:27 4,090,WHP 607,IA 436,OA 108 6/6/2017 6/6/2017 2.10 PROD1 DRILL DRLG P BOBD 1.82 bpm at 5,126 psi,BHP 8,903.0 8,950.0 15:27 17:33 4,085,WHP 583,IA 439,OA 111, DHWOB 1.5 k,CTSW-4 k,ROP 30 fpm 6/6/2017 6/6/2017 4.60 PROD1 DRILL DRLG P OBD 1.77 bpm, CT 5,032 psi,BHP 8,950.0 9,044.0 17:33 22:09 4,194,WHP 700,IA 440,OA 117, WOB 1.1,ROP 27-17 ft/hr. Picked off bottom a few times to restart,clean, PU Wt 29 k lbs. Was taking influx— bbls/hr,increased choke—100 psi, generated new tripping shcedule for 12.0 ppg EMW @ the window,slight losses. ROP's slowy decreasing to —11 ft/h,CT pressure up to 5251 psi over last hour,off bottom free spin 1065 psi. 6/6/2017 6/6/2017 0.70 PROD1 DRILL WPRT P PU Wt 27 k lbs,Pull—2000'wiper 9,044.0 7,058.0 22:09 22:51 through the build section to 7058',saw some spots of motor work to 300 psi from 8814,to 7298',Neg WOB spikes to-1 k from 7914-7239'. CT wt . climbed to—31 k lbs. 6/6/2017 6/6/2017 0.50 PROD1 DRILL WPRT P RBIH,RIH Wt 12k lbs falling off to 8k 7,058.0 9,044.0 22:51 23:21 lbs @ 9022' slight S/D at 8660'and agin near bottom,adjusted pump rate to get back to bottom. 6/6/2017 6/7/2017 0.65 PROD1 DRILL DRLG P Rate @ 1.80 bpm,CT 5126 psi,Free 9,044.0 9,045.0 23:21 00:00 spin diff 930 psi. OBD,CT 5198 psi,CT Wt 0 k lbs, WOB 2.55 k lbs,ROP 6.5 ft/hr Returns 1 for 1 holding 4200 psi annular. 6/7/2017 6/7/2017 0.40 PROD1 DRILL DRLG P Rate @ 1.80 bpm,CT 5126 psi,Free 9,044.0 9,045.0 00:00 00:24 spin diff 930 psi. OBD,CT 5198 psi,CT Wt 0 k lbs, WOB 2.55 k lbs,ROP 6.5 ft/hr Returns 1 for 1 holding 4200 psi annular. 6/7/2017 6/7/2017 2.80 PROD1 DRILL DRLG P Slight drilling break from 9050-9060', 9,044.0 9,085.0 00:24 03:12 ROP increased from 7 to 40 ft/hr. Geos requested to turn straight up, another drilling break at 9078-9088',7 ft/hr to 60+and back down to 15 ft/hr. Drilling ahead,CT WT-3 k lbs,WOB 2.0 k lbs Holding 4200 psi annular, WH 675 psi. Returns 1 for 1. 6/7/2017 6/7/2017 2.25 PROD1 DRILL DRLG P OBD,1.85 bpm,CT 5474 psi,CT wt- 9,085.0 9,110.0 03:12 05:27 1 k lbs,WOB 1.87 k lbs,ROP—10 fUhr 6/7/2017 6/7/2017 0.20 PROD1 DRILL WPRT P BHA wiper up hole,PUW 31 k 9,110.0 9,110.0 05:27 05:39 6/7/2017 6/7/2017 2.25 PROD1 DRILL DRLG P BOBD 1.8 bpm at 5,054 psi,BHP 9,110.0 9,150.0 05:39 07:54 4,211,WHP 860,IA 440,OA 118 Page 6/37 Report Printed: 7/3/2017 Operations Summary (with Timelog Depths) 1G-15 ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/7/2017 6/7/2017 3.80 PROD1 DRILL WPRT P Plug back TD,pump 5x5 sweeps, 9,150.0 7,015.0 07:54 11:42 wiper up hole,PUW 29 k,work problem areas. Problem areas: 8,260'-8,230',motor work 500 psi diff 7,960'-7,940',motor work 150 psi diff 7200'-7260',motor work 500 psi diff 6/7/2017 6/7/2017 0.12 PROD1 DRILL WPRT P Pull up thru window,perform Pressure 7,015.0 7,015.0 11:42 11:49 Survey above window,sensor depth 6,970',6,507'TVD,showing 11.76 Ppg 6/7/2017 6/7/2017 0.75 PROD1 DRILL TRIP P PUW 26 k,RBIH to 8,300',start new 7,015.0 8,300.0 11:49 12:34 mud down the coil. 6/7/2017 6/7/2017 0.75 PROD1 DRILL TRIP P POOH,while swapping to new mud 8,300.0 7,000.0 12:34 13:19 6/7/2017 6/7/2017 1.25 PROD1 DRILL TRIP P Above window,open EDC,continue 7,000.0 78.2 13:19 14:34 POOH 6/7/2017 6/7/2017 2.00 PROD1 DRILL PULD P At surface,PJSM,undeploy drilling 78.2 78.2 14:34 16:34 BHA#7,checks failed,PJSM for undeploy with failed check valves, close EDC. 6/7/2017 6/7/2017 0.50 PROD1 DRILL BOPE P Perform Function test 0.0 0.0 16:34 17:04 6/7/2017 6/7/2017 2.00 PROD1 DRILL PULD P PU anchored billet,stab PDL w BHA 0.0 60.0 17:04 19:04 #8. 6/7/2017 6/7/2017 1.50 PROD1 DRILL PULD P On the well,inspect checks in upper 60.0 81.0 19:04 20:34 quick,inspect stripper, test tools, Crew change,finish up PD BHA, 6/7/2017 6/7/2017 1.00 PROD1 DRILL TRIP P Bump up,space out,RIH,pumping 81.0 6,475.0 20:34 21:34 0.33 bpm 6/7/2017 6/7/2017 0.20 PROD1 DRILL DLOG P Log the HRZ for a-6.5'correction 6,475.0 6,498.0 21:34 21:46 6/7/2017 6/7/2017 0.50 PROD1 DRILL -TRIP P Continue to RIH,Wt Ck @ 6940'28k 6,498.0 7,103.0 21:46 22:16 lbs,Pumps down,Close EDC,orient Billet 20°ROHS,continue to RIH.S/D 7k lbs @ 7103'@ 30 ft/min,PU, RBIH @ 20 ft/min S/D same spot 4.25k lbs, PU,orient to highside,RBIH S/D 1.8 k lbs same spot. 6/7/2017 6/8/2017 1.74 PROD1 DRILL TRIP T PUH,billet above the window,open 7,103.0 2,975.0 22:16 00:00 EDC,online w pumps min rate.POOH w BHA#8. 6/8/2017 6/8/2017 0.70 PROD1 DRILL TRIP T PUH,billet above the window,open 2,975.0 75.0 00:00 00:42 EDC,online w pumps min rate.POOH w BHA#8. 6/8/2017 6/8/2017 1.00 PROD1 DRILL PULD T PJSM,Bump up,space out,pumps 75.0 0.0 00:42 01:42 down,pressure trapped, PUD/LD BHA#8 open hole anchored whipstck. Bottom pup packed full of up to 1/2" chunks of shale. Sample delivered to Geo,opinion is these are old shales that have been in the well for some time and not from the area we set down in. - 6/8/2017 6/8/2017 0.40 PROD1 DRILL CTOP T clean clear floor 0.0 0.0 01:42 02:06 Page 7/37 Report Printed: 7/3/2017 • 1' ,e �, , Operations Summary (with Timelog Depths) 1G-15 ConocaPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/8/2017 6/8/2017 1.70 PROD1 DRILL ' PULD T PU/PD BHA#9,clean out BHA, 1.2° 0.0 78.0 02:06 03:48 AKO motor w D331 bit.stab injector, test tools,bump up,set counters/ Well jug tight during PUD/PD. Total vol pumped on managed pressure line 0 bbls. 6/8/2017 6/8/2017 1.20 PROD1 DRILL TRIP T RIH w BHA#9 78.0 6,436.0 03:48 05:00 6/8/2017 6/8/2017 0.20 PROD1 DRILL DLOG T Tie into HRZ for-4.5'correction, 6,436.0 6,473.0 05:00 05:12 6/8/2017 6/8/2017 2.75 PROD1 DRILL TRIP T Close EDC,Wt Ck 25 k lbs,contiue to 6,473.0 8,100.0 05:12 07:57 RIH,Clean problem areas,7,120', 7,233',7,672',7,700',and 8,050', pump 10x10 sweep 6/8/2017 6/8/2017 1.25 PROD1 DRILL WPRT T POOH,cleaning 8,050', 8,100.0 7,240.0 07:57 09:12 6/8/2017 6/8/2017 0.50 PROD1 DRILL WPRT T PUW 50 k,work pipe free,RBIH thru 7,240.0 7,240.0 09:12 09:42 tight area,PUW 40 k,call town team, decision was made to POOH for WS. 6/8/2017 6/8/2017 3.00 PROD1 DRILL WPRT T POOH,performing sweeps,perform 7,240.0 62.5 09:42 12:42 jogs at 6,500',4,500',2,500',500'. 6/8/2017 6/8/2017 1.50 PROD1 DRILL PULD T At surface, PJSM,PUD cleanout BHA 62.5 0.0 12:42 14:12 6/8/2017 6/8/2017 0.31 PROD1 DRILL PULD T LD cleanout BHA,mill gauged 2.79 no 0.0 0.0 14:12 14:30 -go 6/8/2017 6/8/2017 1.75 PROD1 RPEQPT PULD T PU/MU/PD 3-1/2"XL Monobore WS 0.0 72.4 14:30 16:15 w/RA tags 6/8/2017 6/8/2017 1.70 PROD1 RPEQPT TRIP T RIH,with WS setting BHA#10 72.4 6,442.0 16:15 17:57 6/8/2017 6/8/2017 0.40 PROD1 RPEQPT DLOG T Tie into the HRZ for a+6',have been 6,442.0 6,473.0 17:57 18:21 seeing-4-6'. PUH and relog for zero correction. 6/8/2017 6/8/2017 0.40 PROD1 RPEQPT WPST T Continue to RIH,PU Wt 27k lbs @ 6,473.0 7,028.0 18:21 18:45 6977',Zero WOB,Park bit depth @ 7028.76',PU to neutral weight,27k lbs,Tool face @ high side,S/D pumps,Close EDC,WH @ 1033 psi, on line w the pump,Circ pressure broke over at 5600 psi. Slack off coil weight and S/D 6.7 k lbs,PU 30 k lbs. Set top of WS @ 7018. 6/8/2017 6/8/2017 1.50 PROD1 RPEQPT TRIP T POOH 7,028.0 60.0 18:45 20:15 6/8/2017 6/8/2017 1.20 PROD1 RPEQPT PULD T PJSM,Bump up,Space out,PUD 60.0 0.0 20:15 21:27 BHA#10 6/8/2017 6/8/2017 1.40 PROD1 WHPST PULD T PU&PD BHA#11,tubing window 0.0 74.0 21:27 22:51 mill asembly,0.6°AKO inteq motor, bump up,test tools. 6/8/2017 6/9/2017 1.15 PROD1 WHPST TRIP T RIH, 74.0 6,444.0 22:51 00:00 6/9/2017 6/9/2017 0.20 PROD1 WHPST -DLOG T Tie into the HRZ for-2'correction. 6,444.0 6,475.0 00:00 00:12 6/9/2017 6/9/2017 0.50 PROD1 WHPST TRIP T PU Wt 25k,down on pumps,close 6,475.0 7,018.0 00:12 00:42 EDC,continue to RIH. 6/9/2017 6/9/2017 0.10 PROD1 WHPST WPST T Zero WOB,tag top of WS @ 7018', 7,018.0 7,000.0 00:42 00:48 S/D 4 k lbs,PU Wt 30 k lbs, Page 8/37 Report Printed: 7/3/2017 • • " ° Operations Summary (with Timelog Depths) ConocoPhiiiips y Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/9/2017 6/9/2017 0.30 PROD1 WHPST WPST T Set Rate @ 1.74 bpm,CT 4000 psi, 7,000.0 7,018.6 00:48 01:06 free spin diff 408 psi,WH 806 psi. Zero WOB,motor work started at 7018.6' 6/9/2017 6/9/2017 0.90 PROD1 WHPST WPST T Mill Exit window,WOB 1.9 k lbs,200 7,018.6 7,019.6 01:06 02:00 psi motor work 6/9/2017 6/9/2017 5.25 PROD1 WHPST WPST T Mill exit window in 3.5"WOB 2.6 k lbs, 7,019.6 7,024.6 02:00 07:15 ROP-0.8-1.0 ft/hr Zero vol counter4,pump 5 bbl red pill, 123 bbl theoretical round trip estimating 2 bbl surface lines,pumped 11 bbls.Saw dye back at 113 bbls pumped. 10 bbls early. WOB started to fall off @ 2.2-2.5' milled. 6/9/2017 6/9/2017 0.50 PROD1 WHPST WPST T Back ream window area,(clean) 7,024.6 7,024.6 07:15 07:45 6/9/2017 6/9/2017 1.25 PROD1 WHPST WPST T POOH,pumping 1.94 bpm at 3863 7,024.6 74.2 07:45 09:00 psi,following MP schedule 6/9/2017 6/9/2017 1.50 PROD1 WHPST PULD T At surface,space out,PJSM, 74.2 0.0 09:00 10:30 Undeploy milling BHA#11,changeout motor 6/9/2017 6/9/2017 1.25 PROD1 WHPST PULD T PD second milling BHA#12 0.0 76.8 10:30 11:45 6/9/2017 6/9/2017 1.50 PROD1 WHPST TRIP T RIH,with 1.25°WFT motor,string 76.8 6,445.0 11:45 13:15 reamer,and window fat radius mill 6/9/2017 6/9/2017 0.25 PROD1 WHPST DLOG T Log the HRZ correction of minus 5.0', 6,445.0 6,465.0 13:15 13:30 PUW 25 k 6/9/2017 6/9/2017 0.25 PROD1 WHPST TRIP T RIH,to dry tag 6,465.0 7,024.6 13:30 13:45 6/9/2017 6/9/2017 6.00 PROD1 WHPST MILL T OBM, 1.8 bpm at 4,300 psi,BHP 7,024.6 7,033.6 13:45 19:45 4,059,WHP 840,IA 422,OA 83 WOB fell off from 1.4 k to 0.25 k @• 7027.2',continue to drill ahead to 7033.60'. Catch a sample,consult w Geo,'-30%shale,call TD of rat hole. 6/9/2017 6/10/2017 4.25 PROD1 WHPST REAM T PUH,back reaming above Whipstock, 7,033.6 7,031.6 19:45 00:00 make reaming passes,initial @ HS as drilled,back down,up at 30 ROHS, down small spike in motor work @ 7023',up at 330 ROHS,pumps off, WOB spike to 3k lbs @ 7024.6'on the trip in. Pumps up to 1.86 bpm,back ream out 180 ROHS,some motor work @ 7027',RBIH HS,Clean.back ream out LS. Dry drift high side,WOB spike 1.87 k lbs @ 7023.9' Up on the pumps,Back ream out of hole HS, down HS,up 45 ROHS,down HS,up 315 ROHS.dry drift,same bump at 7023.1'1.2k lbs. Back ream HS,dry drift at 30 fUmin,clean, Back ream out HS,dry drift again @ 30 ft/m,saw string weight slack off but no WOB. 6/10/2017 6/10/2017 0.10 PROD1 WHPST REAM T Bottom has been creaping up,7031' 7,031.6 7,033.6 00:00 00:06 compared to 7033'TD. Remill to previous TD of 7033.6',pump 5x5 sweep. Page 9/37 Report Printed: 7/3/2017 • • . 4 Operations Summary (with Timelog Depths) 1G-15 ConocaPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/10/2017 6/10/2017 0.30 PROD1 WHPST REAM T PUH on last reaming pass HS. 7,033.6 7,017.0 00:06 00:24 6/10/2017 6/10/2017 0.20 PROD1 WHPST TRIP T Open EDC,struggled to get 7,017.0 6,967.0 00:24 00:36 differential pressure low enough to open. 6/10/2017 6/10/2017 1.40 PROD1 WHPST TRIP T POOH,pumping 2.2 bpm,pulling 100 6,967.0 75.0 00:36 02:00 ft/min(75%is 109 ft/min). Lots of metal at the shaker the whole trip out. Jog near surface. 6/10/2017 6/10/2017 1.70 PROD1 WHPST PULD T PJSM,bump up,space out,PUD& 75.0 0.0 02:00 03:42 LD BHA#12. 6/10/2017 6/10/2017 0.80 PROD1 WHPST CTOP T Install nozzle,stab injector,jet stack, 0.0 0.0 03:42 04:30 unstab,prep. 6/10/2017 6/10/2017 1.50 PROD1 WHPST PULD T PJSM,PU&PD BHA#13. A lat build 0.0 75.0 04:30 06:00 assembly W 2.5°AKO,stab injector, inspect stripper elements. 6/10/2017 6/10/2017 1.25 PROD1 DRILL TRIP T RIH,with build section BHA#13,2.6° 75.0 6,445.0 06:00 07:15 ako motor 6/10/2017 6/10/2017 0.25 PROD1 DRILL DLOG T Log the HRZ correction of minus 3.5', 6,445.0 6,480.0 07:15 07:30 PUW 24 k,close the EDC. 6/10/2017 6/10/2017 0.50 PROD1 DRILL TRIP T Continue IH,thru window. 6,480.0 7,033.0 07:30 08:00 6/10/2017 6/10/2017 4.00 PROD1 DRILL DRLG T OBD,1.8 bpm at 4,270 psi,BHP 7,033.0 7,215.0 08:00 12:00 3908,WHP 665, IA 419,OA 81 6/10/2017 6/10/2017 0.35 PROD1 DRILL WPRT T TD Build section,wiper up to the 7,215.0 7,004.0 12:00 12:21 window,PUW 27 k , 6/10/2017 6/10/2017 1.50 PROD1 DRILL TRIP T Open EDC,POOH, pumping 2.2 bpm 7,004.0 72.2 12:21 13:51 at 4,200 psi,following MP,tracking trip sheet. 6/10/2017 6/10/2017 1.25-PROD1 DRILL PULD T PJSM,PUD build section BHA 72.2 0.0 13:51 15:06 6/10/2017 6/10/2017 1.25 PROD1 DRILL PULD T PU/PD latreral drilling BHA#14,test 0.0 80.8 15:06 16:21 tools(good test) 6/10/2017 6/10/2017 1.25 PROD1 DRILL TRIP T RIH,w/lateral drilling BHA with WFT 80.8 6,445.0 16:21 17:36 motor and New Duraforce Edge Bit 6/10/2017 6/10/2017 0.20 PROD1 DRILL DLOG T Log the HRZ correction of-5.5', 6,445.0 6,478.0 17:36 17:48 6/10/2017 6/10/2017 0.40 PROD1 DRILL TRIP T Close EDC,Wt check 27 k lbs,PU, 6,478.0 7,215.0 17:48 18:12 continue to RIH,pumps off @ 6970', window clean at 35 ft/min. Claystop @ 2.5%,KCI @ 6% 6/10/2017 6/10/2017 0.20 PROD1 DRILL DLOG T log RA tag,7023'. Right below 7,215.0 7,082.0 18:12 18:24 ambient high gamma signature, suspect scale from Iperf. 6/10/2017 6/10/2017 0.10 PROD1 DRILL TRIP T Continue to RIH,set rate. 7,082.0 7,215.0 18:24 18:30 6/10/2017 6/10/2017 2.50 PROD1 DRILL DRLG T 1.80 bpm,CT 4716 psi,free spin diff 7,215.0 7,445.0 18:30 21:00 1140 psi. OBD,-70 ft/hr,1.5 k WOB,CT 5340 psi Decent stall @ 7233',picked up, worked through hard spot. PU and restart,27k lbs,PU to reset MWD computer,RES tool not turned on,27 k lbs Pass possiible fault 32 as indicated on RES @ 7370' Average 92 ft/hr over interval, Page 10/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) 0 • 1G-15 Cor►ocoPhiiiips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/10/2017 6/11/2017 3.00 PROD1 DRILL DRLG T OBD,CT 5470 psi,Annular 4202 psi, 7,445.0 7,782.0 21:00 00:00 Wh 795 psi,WOB 1.5 k lbs, ROP 115 ft/hr,CT Wt 10.2 k lbs. Sailed 5x5 sweep with good results at the shaker and per Wellworc. @ 7670'ROP climbed to-150 ft/hr, look to be into sand by 7710'. Pump another 5x5 sweep.Ct wt 7.9 k lbs, WOB 1.67k lbs,ROP 147 ft/hr. In sand,Ct wt, 10.6 k lbs,ROP 150 ft/hr, WOB 0.8 K lbs **3 hrs on bottom 337 ft drilled, 112 ft/h over the interval 6/11/2017 6/11/2017 0.20 PROD1 DRILL WPRT T Wiper trip,567',PU Wt27k,Pull off 7,782.0 7,050.0 00:00 00:12 bottom 2 bbls after sweeps exit the bit and chase up hole. 6/11/2017 6/11/2017 0.10 PROD1 DRILL DLOG T Log the RA Tag for a Zero correction. 7,050.0 7,080.0 00:12 00:18 6/11/2017 6/11/2017 0.40 PROD1 DRILL WPRT T Wiper back in hole,RIH Wt 14 k lbs, 7,080.0 7,782.0 00:18 00:42 slow down to log the bypassed Res. 6/11/2017 6/11/2017 1.70 PROD1 DRILL DRLG T Set rate at 1.81 bpm,CT 5300 psi, 7,782.0 7,958.0 00:42 02:24 Free spin diff 1300 psi,RIH wt 12 k lbs.WH 701 psi. OBD,CTWt10.3klbs,WOB 1.3k lbs,ROP 150 ft. Good returns to the shaker from trip/sweeps. WellWorc cuttings ration went from 0.99 to 1.12 as sweeps landed. ROP eratic from 280-40 ft/hr. **Drilled 176'in 1.7 hrs for 103 ft/hr average rate 6/11/2017 6/11/2017 0.70 PROD1 DRILL DRLG T Started loosing returns,0.5 bpm loss 7,958.0 8,030.0 02:24 03:06 rate,©7958'. Losses increased to 0.75 bpm by 7991',healed slowly to 0.25 bpm by 8010'. OBD,CT 5291',WH 800 psi,CT Wt 7.8 k lbs,WOB 1.0 k lbs,ROP 122 ft/hr 6/11/2017 6/11/2017 0.90 PROD1 DRILL DRLG T Losses grew to 89%,@ 8030'. Closed 8,030.0 8,096.0 03:06 04:00 choke and drilled ahead with 100% losses. started building 40 bbl ultra high vis pill. WOB fell off,Pu to restart,34k lbs. Drill ahead 30 feet,PU,Wt 33 k lbs, reduce rate to 1.52 bpm,RBIH CT 4300,free spin diff 950 psi,CT wt 8.7 k lbs,WOB 1.74 k lbs,ROP 163 ft/hr Atempt to open choke w WH @ 1000 psi,holding 11.44 ppg at the window returns stabilized at 0.55 bpm,or 37% shut in choke. Page 11/37 Report Printed: 7/3/2017 • • .r iA Operations Summary (with Timelog Depths) m IG-15 ConocoPhiilips hl^rk.x Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/11/2017 6/11/2017 0.70 PROD1 DRILL DRLG T Getting sticky,PU 100 feet,PU Wt 33 8,096.0 8,146.0 04:00 04:42 k lbs, RBIH. Pill exiting the nozzle, built WH to 1030, 12.5 ppg EMW at the window. Open choke targeting 11.8 ppg at the window,returns stabilized at 1.5 bpm in,0.4 bpm out. S/I choke,Pu Wt 30 k lbs,drilled ahead squeezing away until 12.4 ppg at the window, 1040 psi WH.Opened choke,rates stabilized at 1.5 bpm in, 1.0 bpm out. Pick up Wt 30 k lbs. 6/11/2017 6/11/2017 1.75 PROD1 DRILL DRLG T OBD with partial returns. 1.5 bpm in 1 8,146.0 8,278.0 04:42 06:27 bpm out. CT 4543 psi,WH 630 psi,CT Wt 4.5 k lbs,WOB 1.8 k lbs,ROP 100 ft/hr.• "'8,185'close choke'*' 6/11/2017 6/11/2017 0.50 PROD1 DRILL WPRT T Wiper up hole.PUW 36 k 8,278.0 7,060.0 06:27 06:57 6/11/2017 6/11/2017 0.50 PROD1 DRILL WPRT T Wiper back in hole,RIW 12 k 7,060.0 8,278.0 06:57 07:27 6/11/2017 6/11/2017 2.00 PROD1 DRILL DRLG T BOBD,1.8 bpm at 5,165 psi,BHP 8,278.0 8,477.0 07:27 09:27 3,939,WHP 525, IA 422,OA 88,0.5 bpm losses(35%loss rate) 6/11/2017 6/11/2017 0.50 PROD1 DRILL WPRT T Wiper up hole, PUW 35 k 8,477.0 7,700.0 09:27 09:57 6/11/2017 6/11/2017 0.40 PROD1 DRILL WPRT T Wiper back in hole,RIW 12 k 7,700.0 8,477.0 09:57 10:21 6/11/2017 6/11/2017 3.50 PROD1 DRILL DRLG T BOBD, 1.8 bpm at 4,415 psi,BHP 8,477.0 8,648.0 10:21 13:51 3494,WHP 302, IA 411,OA 80 6/11/2017 6/11/2017 1.00 PROD1 DRILL WPRT T Wiper up hole,PUW 36 k,perform job 8,648.0 7,000.0 13:51 14:51 below window 7,075'to 7,200' 6/11/2017 6/11/2017 0.45 PROD1 DRILL WPRT T Open EDC,Wiper up hole above 7,000.0 6,440.0 14:51 15:18 cross-over 6/11/2017 6/11/2017 0.25 PROD1 DRILL DLOG T Log the HRZ correction of plus 2.5' 6,440.0 6,482.0 15:18 15:33 6/11/2017 6/11/2017 1.20 PROD1 DRILL WPRT T RIH,back to bottom,closing the EDC 6,482.0 8,648.0 15:33 16:45 at 7,000". 6/11/2017 6/11/2017 1.70 PROD1 DRILL DRLG T BOBD, 1.8 bpm at 4,830 psi,BHP 8,648.0 8,721.0 16:45 18:27 3,610,WHP 380(closed choke),IA 402,OA 65 6/11/2017 6/11/2017 4.10 PROD1 DRILL DRLG T OBD,Wh 403 psi, 10.5 ppg EMW @ 8,721.0 8,850.0 18:27 22:33 the window. CT Wt-2 k lbs,WOB 2.99 k lbs,ROP 20-100 ft/hr. A couple heavyier pick ups when up against suspect siderite lenses,-43- 47 k lbs. **31.4 ft/hr while on bottom 6/11/2017 6/11/2017 0.40 PROD1 DRILL WPRT T Wiper trip(1138'),PU Wt 45 k lbs, 8,850.0 7,712.0 22:33 22:57 motor work and neg WOB from 8300- 8260' 6/11/2017 6/11/2017 0.50 PROD1 DRILL WPRT T RBIH,RIH Wt 14 k until 8544 where it 7,712.0 8,786.0 22:57 23:27 dropped to ilk lbs. Multiple setdowns,8627-8720' 6/11/2017 6/11/2017 0.20 PROD1 DRILL WPRT T PU,ream throuth tight spots,to 8506', 8,786.0 8,850.0 23:27 23:39 turn around RBIH. Minor Stack outs @ 8644,8737,and 8820'. Page 12/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) 1G-15 ConocoPhillips .51.rke - Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/11/2017 6/12/2017 0.35 PROD1 DRILL DRLG T set rate @ 1.78 bpm,closed choke, 8,850.0 8,858.0 23:39 00:00 WH 523 psi,ECD @ window 11.0 ppg,CT 4364 psi,feee spin 1240 psi. OBD,CT wt 0.1 k lbs,WOB 1.88 k lbs, ROP 34 ft/hr **22.8 ft/hr while on bottom 6/12/2017 6/12/2017 1.20 PROD1 DRILL DRLG T OBD,Variable ROP, 15-100+ft/hr. 8,858.0 8,894.0 00:00 01:12 Hard spot @ 8879'. High WOB,low motor work. Broke free drilled ahead • 6/12/2017 6/12/2017 1.00 PROD1 DRILL DRLG T Drilling ahead,Differential motor work 8,894.0 8,900.0 01:12 02:12 increased&WOB fell off 8899',PU 34 k lbs,atempted to RBIH and found bottom @ 8887', PU 42 k lbs,RBIH find bottom at 8879' Multiple pick ups and set downs,2.25 k lbs WOB with little to no motor work stack out at 8878'.Pick up RBIH 7 th time,slowly start makinjg hole. Drill ahead. Differential sticking BHA from DPS down,51 '? 6/12/2017 6/12/2017 5.10 PROD1 DRILL DRLG T OBD drilling ahead CT wt'0 k lbs, 8,900.0 9,024.0 02:12 07:18 WOB 0.7 k lbs,ROP 20-100 ft/hr. Pumped hi-vis pill wl 5%LVT- (Alpine Pill) pre CT Wt-6.3 k WOB 0.38 k lbs, ROP 37.5 ft/hr.Pick up and restart. post CT Wt 4.2-0 k lbs, 1.4-1.2 k WOB,ROP 80-127 ft/hr Effects of pill lasted-30 min ROP 69 ft/hr during that time. Pumped another 10 bbl pill BHP has climbed slowly over the last two hours from 10.6 to 11.2 EMW @ the window. 6/12/2017 6/12/2017 0.25 PROD1 DRILL DRLG T Wiper up hole,PUW 33 k 9,024.0 7,700.0 07:18 07:33 6/12/2017 6/12/2017 0.25 PROD1 DRILL WPRT T Wiperback in hole,RIW 6 k,work, 7,700.0 9,024.0 07:33 07:48 pipe thru fractured section 8288'- 8,890' 6/12/2017 6/12/2017 3.10 PROD1 DRILL WPRT T BOBD, 1.78 bpm at 3,585',BHP 9,024.0 9,050.0 07:48 10:54 3,693,WHP 655,IA 413,OA 77 6/12/2017 6/12/2017 1.00 PROD1 DRILL TRIP T POOH for BHA check,PUW 32 k,lay 9,050.0 7,000.0 10:54 11:54 in high-vis pill up to 7,000',didn't see much advantage from pumping. 6/12/2017 6/12/2017 1.25 PROD1 DRILL TRIP T Continue POOH,closed choke. 7,000.0 80.8 11:54 13:09 pumping 1.5 bpm following MP. 6/12/2017 6/12/2017 1.25 PROD1 DRILL PULD T At surface,PJSM,PUD drilling BHA# 80.8 0.0 13:09 14:24 14 6/12/2017 6/12/2017 1.00 PROD1 DRILL. SVRG P Service rig,install and test hydraulic 0.0 0.0 14:24 15:24 fittings. 6/12/2017 6/12/2017 1.50 PROD1 DRILL PULD T PU/MU/PD BHA#15 0.0 80.8 15:24 16:54 6/12/2017 6/12/2017 1.25 PROD1 DRILL TRIP T RIH,with drilling BHA#15 with WFT 80.8 6,445.0 16:54 18:09 motor and new bi-cneter bit 6/12/2017 6/12/2017 0.40 PROD1 DRILL DLOG T Log the HRZ correction of plus 23' 6,445.0 6,485.0 18:09 18:33 6/12/2017 6/12/2017 1.25 PROD1 DRILL CIRC T Continue RIH,Circ 80 bbls of Flo-pro 6,485.0 6,950.0 18:33 19:48 down the back side,2.0 bpm at 6/12/2017 6/12/2017 0.75 PROD1 DRILL TRIP T RIH thru window 6,950.0 9,050.0 19:48 20:33 Page 13/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) Kt . .t 1G-15 +conocot?hiHlips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/12/2017 6/12/2017 3.00 PROD1 DRILL DRLG T OBD, 1.8 bpm at 4,785 psi,BHP 9,050.0 9,113.0 20:33 23:33 3792,WHP 691,IA 405,OA 70, DHWOB 1.2 k,CTSW 2 k,ROP 26 FPH 6/12/2017 6/12/2017 0.25 PROD1 DRILL WPRT T Wiper up hole,PUW 38 k 9,113.0 8,613.0 23:33 23:48 6/12/2017 6/13/2017 0.20 PROD1 DRILL WPRT T Wiper back in hole,trouble getting to 8,613.0 8,192.0 23:48 00:00 bottom PBUH to clean up hole. 6/13/2017 6/13/2017 1.20 PROD1 DRILL WPRT T Struggle to get back to bottom. 8,192.0 9,113.0 00:00 01:12 Pumped 5x5 sweep,Set downs at 8360,8553,CT running weight fell off sharply @ 8517'. PU and restart. Weights and running speeds improved significantly as sweeps exited the bit+ -8672'. Continue to RIH. 6/13/2017 6/13/2017 1.20 PROD1 DRILL DRLG T 1.78 bpm. Ct-5k=1-,WOB 0.5 k lbs, 9,113.0 9,150.0 01:12 02:24 ROP 20 ft/hr.free spin diff 1145 psi. 5x5 lube/LVT pill exits,WOB climbed steadily to+/-1.5 K WOB,ROPS variable,50-20 fUhr. Drilled ahead,built full pit of alpine pill, 1.5%776,W/2 ppb beads. **31 ft/hr over the interval on bottom 6/13/2017 6/13/2017 2.60 PROD1 DRILL DRLG P Passed 9150'off trouble time from 9,150.0 9,294.0 02:24 05:00 plug back 1.78 bpm. CtWtO-5k/-,WOB 0.5- 1.5 k lbs,ROP 20-50 ft/hr.free spin diff 1140 psi.Drilled ahead,built full pit of alpine pill, 1.5%776,W/2 ppb beads.pumping pills as needed. CT Wt back to 7 k lbs post beads, Last PU 34 k lbs,had been consistently 43 k prior to lubes/beads. **55 fUhr over the interval on bottom 6/13/2017 6/13/2017 1.30 PROD1 DRILL DRLG P Drilling ahead 9,294.0 9,400.0 05:00 06:18 CT Wt-2 k lbs,WOB 0.8 k lbs, ROP 80 ft/hr. ***82 ft/hr over the last interval on bottom 6/13/2017 6/13/2017 0.80 PROD1 DRILL WPRT P Wiper trip(1650') PU Wt 36k lbs 9,400.0 7,750.0 06:18 07:06 6/13/2017 6/13/2017 0.70 PROD1 DRILL WPRT P Turn around RIH Wt vastly improved, 7,750.0 9,400.0 07:06 07:48 15k tapering to 11 k lbs by 8926'. CT Wt tapered off to 11 k lbs by 9150'. Hole clean less one WOB bobble at 8365'@ Falut A. 6/13/2017 6/13/2017 1.10 PROD1 DRILL DRLG P 1.80 bpm,CT 4175 psi,WH 600 psi, 9,400.0 9,450.0 07:48 08:54 ECD 11.1 ppg @ the window. Closed choke. OBD,CT Wt 0-5 k lbs,WOB 2.2 k lbs,ROP 40 ft/hr. drilling break at 9445'. ***45 ft/hr over the last interval on bottom 6/13/2017 6/13/2017 0.20 PROD1 DRILL DRLG P Missed two surveys,PU to grab 9,450.0 9,450.0 08:54 09:06 surveys,PU Wt,34k lbs. Page 14/37 Report Printed: 7/3/2017 > • • ; , Operations Summary (with Timelog Depths) - 1G-15 ConocoPhifii s Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log • Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/13/2017 6/13/2017 2.40 PROD1 DRILL DRLG P 1.80 bpm,CT 4175 psi,WH 600 psi, 9,450.0 9,607.0 09:06 11:30 ECD 11.1 ppg @ the window. Closed choke. OBD,CT Wt 0-5 k lbs,WOB 2.2 k lbs,ROP 40 ft/hr. drilling break at 9445',hard stuff @ 9539'. Geos asking to point down. Heavy vibrations,DD asked to reduce pump rate,little change in vibrations @ 1.6 bpm,WH from 430 to 300 psi in ten minutes, EDC dropped to 9.9 ppm ' EMW. Increased rate to 1.82 bpm. Last two pick ups,55 k lbs&60 k lbs. """65 ft/hr over the last interval on bottom 6/13/2017 6/13/2017 1.50 PROD1 DRILL WPRT P Wiper,third for tie in,PU 60 k lbs. 9,607.0 7,040.0 11:30 13:00 Neg WOB spike @ 9482'. Start pulling heavy coil wt @ 8687,weigth fell off then increased @ 8392,8386'. atempt to RBIH,S/D-5 k lbs,Work pipe to 60 k up,-10 down,rotate tool face,bit free.Pump 10 bble beaded pill. Work pipe and vary pump speed. Pull free pror to pill coming out. Continue to POOH. 6/13/2017 6/13/2017 0.20 PROD1 DRILL DLOG P Tie into RA tag for+7' 7,040.0 7,098.0 13:00 13:12 6/13/2017 6/13/2017 1.50 PROD1 DRILL WPRT P Wiper back in hole. Carry 15 k CT Wt 7,089.0 9,607.0 13:12 14:42 to 8464'where it fell off rapidy to 7k by 8867'. Multiple set downs and snubbing by 9100'. PU slowly until bead pill reaches the bit. RBIH,CT Wt 9 k lbs as we ran past 9100'. 6/13/2017 6/13/2017 0.20 PROD1 DRILL DRLG P 1.78 bpm,free spin diff 1030 psi. CT 9,607.0 9,621.0 14:42 14:54 Wt-2 k lbs,WOB 1.5 k lbs,ROP 60 ft/min Lost WOB and all motor work. 6/13/2017 6/13/2017 0.20 PROD1 DRILL WPRT P PU Wt 48 k lbs,pull heavy 41-45 k 9,621.0 9,621.0 14:54 15:06 lbs,Turn around at 9300'as pill exiting the nozzle. RBIH. RIH Wt 10- 6/13/2017 6/13/2017 2.20 PROD1 DRILL DRLG P 1.78 bpm,free spin diff 1030 psi. CT 9,621.0 9,756.0 15:06 17:18 Wt-2 k lbs,WOB 1.5 k lbs,ROP 60 ft/min Lost WOB and all motor work.PU,Wt 54 k lbs,PUH,RBIH,drill ahead. 1.82 bpm,free spin diff 1250 psi,CT Wt-3 k lbs,WOB 1.9 k lbs,ROP 29 ft/ hr. Missed 2 surveys 9700',PU 42 k lbs, RBIH, 6/13/2017 6/13/2017 0.50 PROD1 DRILL DRLG P RBIH,set rate 1.74 bpm, 1150 free 9,756.0 9,791.0 17:18 17:48 spin,CT 3850 psi. 6/13/2017 6/13/2017 0.70 PROD1 -DRILL WPRT P Wiper trip,PUW=48K9,791.0 8,500.0 17:48 18:30 Page 15/37 Report Printed: 7/3/2017 i Operations Summary (with Timelog Depths) y�ry 1G-15 • ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/13/2017 6/13/2017 1.70 PROD1 DRILL WPRT P Wiper in-hole,working to get to 8,500.0 9,791.0 18:30 20:12 bottom,pumped beaded pill to aid getting to bottom,stacking weight at —9575',re-orient TF in attempt to get by 9575',experience difficulty passing 9564'.beads begin exiting bit,difficulty passing 9585'&9607',continue to adjust TF.RIW=9.5K (note:ECD down to 10.3 ppg), 6/13/2017 6/13/2017 1.80 PROD1 DRILL DRLG P BOBD,FS=1079 psi pumping 1,78 9,791.0 9,852.0 20:12 22:00 bpm,bounced off something hard at 9790'with—60°DLS average over 20' section,annular suddently dropped at 9841'from 3700 psi to 3550'psi,ECD dropped to as low as—9.2 ppg. 6/13/2017 6/13/2017 1.30 PROD1 DRILL WPRT P Pulled short WT to 9650',begin 9,852.0 9,852.0 22:00 23:18 building 40 bbl 100K LSRV pill to aid in increased losses,WHP=345 psi, rate=1.43 bpm,annular=3422 psi, difficulty getting started drilling at ' 9852',PUW=48K,begin pumping 40 bbl 100K LSRV pill. 6/13/2017 6/14/2017 0.70 PROD1 DRILL DRLG P BOBD,CWT=-5K,WOB=2K,rate= 9,852.0 9,860.0 23:18 00:00 1.74 bpm,ECD=9,86 ppg,ROP=48 fph,PU to avoid differential sticking at 9858',100K LSRV pill exits bit,helps to increase annular pressure,though still low at 3482 psi(10.5 ECD at 9860') 6/14/2017 6/14/2017 1.60 PROD1 DRILL DRLG P Continue drilling with low ROP, 9,860.0 9,863.0 00:00 01:36 lube/bead pills having limited success, continual PU's to make any progress, CWT=-10K,WOB=.8K,rate=1.8 bpm,annular=3500 psi,WHP=490 psi,difficulty getting started at 9862', attempting various rates 6/14/2017 6/14/2017 1.10 PROD1 DRILL DRLG P Continue to attempt to make progress 9,863.0 9,864.0 01:36 02:42 at 9863',drilling on hard spot with motor work indicated.begin pumping increased lube pill(1.5%/1.5%u 776/LoTorq,2 ppb beads,LVT) 6/14/2017 6/14/2017 0.30 PROD1 DRILL WPRT P Wiper up to 9550 while waiting for pill 9,864.0 9,550.0 02:42 03:00 to come around,PUW=44K 6/14/2017 6/14/2017 1.40 PROD1 DRILL WPRT P Increased lube pill entirely out bit, 9,850.0 9,865.0 03:00 04:24 experience difficulty getting back to. bottom past 9855',stacking weight, attempting various TF's,run in speeds,rates with no success. Another lube/bead pill begins exiting bit with no success,have good RIW, though lose it all when approaching 9855',differential is extremely low. Work to bottom but can not drill past 9852' 6/14/2017 6/14/2017 1.30 PROD1 DRILL WPRT P Consult with town,pump sweeps and 9,865.0 8,437.0 04:24 05:42 start wipering out of hole for BOP test. Page 16/37 Report Printed: 7/3/2017 • i • Operations Summary (with Timelog Depths) r 1 G-15 Co€oco hillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/14/2017 6/14/2017 1.70 PROD1 DRILL WPRT T While POOH chasing sweeps pull 8,437.0 8,420.0 05:42 07:24 heavy at 8437', RBIH,stack out,work pipe,-8 k down and able to RIH but unable to POOH with multiple attempts to 73 K lbs. Hanging up at 8420 bit depth. Coil connector right at A default where we were stuck yesterday. Pump pills and continue to work pipe,pop free at-66k while POOH at 55 ft/min. 6/14/2017 6/14/2017 2.00 PROD1 DRILL WPRT P Continue to POOH. Build section 8,420.0 66.0 07:24 09:24 clean with regard to CT wt and WOB. No noticeable motor work,but very low diff too. Pause at the window,S/D pumps,observe EDC fall to 10.1 ppg in-1 minute. Assume 10.5 is adequate kill weight. Online w/ pumps,continue to POOH. 6/14/2017 6/14/2017 1.80 PROD1 DRILL PULD P PJSM, Bump up,space out. PUD and 66.0 0.0 09:24 11:12 LD BHA#15. weatherford motor parted at the AKO. Left-2.2'tip of 2 3/8"WFT Motor 0.75°AKO(T22505) plus NOV Bi Center bit 0.65'(A226202)down hole 6/14/2017 6/14/2017 1.50 PROD1 DRILL PULD P Jet stack,test inner reel valve-Good, 0.0 0.0 11:12 12:42 note,can not pump managed pressure while jetting stack. (Inner real valve satisfies flood up and shell test) 6/14/2017 6/14/2017 0.50 PROD1 DRILL CTOP P Unstab injector,complete greasing 0.0 0.0 12:42 13:12stack,instal night cap,flood up. 6/14/2017 6/14/2017 1.20 PROD1 WHDBOP BOPE P Test 1 Swab#1,low good,bump, 0.0 0.0 13:12 14:24 regrease,retest,pass 6/14/2017 6/14/2017 0.40 PROD1 WHDBOP BOPE P Test 3,no double swab,i.e.no test 0.0 0.0 14:24 14:48 #2. Lower blind shear, BOP TV2, bump once,low high good. 6/14/2017 6/14/2017 0.20 PROD1 WHDBOP BOPE P Test 4,TV1,low/high good 0.0 0.0 14:48 15:00 6/14/2017 6/14/2017 0.40 PROD1 WHDBOP BOPE P Test 5,upper blind,B1&5,C 4,5,8 0.0 0.0 15:00 15:24 &12,R1 and bleeder 1,low/high good hydraulic leak on blind ram,bleed down,mechanic on call. 6/14/2017 6/14/2017 1.80 PROD1 WHDBOP BOPE P line up to pump managed presure, 0.0 0.0 15:24 17:12 pump managed pressure 6/14/2017 6/14/2017 1.80 PROD1 WHDBOP BOPE P Test 5,upper blind,B1&5,C 4,5,8 0.0 0.0 17:12 19:00 &12,R1 and bleeder 1,low/high good 6/14/2017 6/14/2017 0.60 PROD1 WHDBOP BOPE P Test 6,Charlie 3,6,7,&1,Bravo 2 0.0 0.0 19:00 19:36 &6&Tango 2,low/high good Test 7,Manual Choke D&Super Choke C, 1500 psi test,good 6/14/2017 6/14/2017 0.20 PROD1 WHDBOP BOPE P Test 8,Charlie 2, 10&Tango 1,good 0.0 0.0 19:36 19:48 Page 17/37 Report Printed: 7/3/2017 ,. • • :t, : ,,, n',1,:-6,, Operations Summary (with Timelog Depths) 1G-15 ConocaPhillip ,'da:ka Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log II Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/14/2017 6/14/2017 0.60 PROD1 WHDBOP BOPE P Test 9, Romeo 2,Bleeder 2,Charlie 1 0.0 0.0 19:48 20:24 &9,low test bleeding off,second low test good,high good. Note:Begin building liner running pill/KWF to 10.5 ppg as per town discussion. 6/14/2017 6/14/2017 0.50 PROD1 WHDBOP BOPE P Test 10,Bravo 4&8,Romeo 3& 0.0 0.0 20:24 20:54 Bleeder 3,low/high,good 6/14/2017 6/14/2017 0.80 PROD1 WHDBOP BOPE P Test 11,Bravo 3&Bravo 7,Liine up 0.0 0.0 20:54 21:42 to pummp managed pressure,install test joint. 6/14/2017 6/15/2017 2.30 PROD1 WHDBOP BOPE P Test 12-16,difficulty getting low test 0.0 0.0 21:42 00:00 on test 14 as pressure rises requiring reducing MP rate momentarily, complete BOPE test at midnight. 6/15/2017 6/15/2017 1.70 PROD1 DRILL CTOP P LD test joint, MU nozzle,stab on,blow 0.0 0.0 00:00 01:42 -down well control choke,change out UQC,perfrom slack management 6/15/2017 6/15/2017 1.70 PROD1 DRILL PULD T PJSM,PU/PD BHA#16 Clean-out 0.0 62.0 01:42 03:24 Assembly(.6°AKO X-Treme motor, D331 ridge-set w/back cutters),tag up 6/15/2017 6/15/2017 1.20 PROD1 DRILL , TRIP T RIH with BHA#16,EDC open, 62.0 6,415.0 03:24 04:36 6/15/2017 6/15/2017 0.30 PROD1 DRILL DLOG T Tie for-6.5'correction 6,415.0 6,461.0 04:36 04:54 6/15/2017 6/15/2017 0.40 PROM DRILL TRIP T Continue RIH,close EDC after step 6,461.0 6,951.0 04:54 05:18 rate test. Perform step rate test at window: 2.25 bpm=10.32 ECD 1.75 bpm=10.28 ECD 1.25 bpm=10.0 ECD 1.00 bpm=9.8 ECD 6/15/2017 6/15/2017 2.80 PROD1 DRILL TRIP T Continue to RIH,pass window clean, 6,951.0 9,564.0 05:18 08:06 build clean,continue to RIH in open hole, 1.3 bpm @ 50 ft/min. See-1 k WOB spike at 8354 A fault,continue to RIH,S/D 9566',PU 41 k lbs,RBIH S/D 1.7 k WOB @ 9569',consult W town,RBIH,S/D 3rd time 9564,PU 38 k lbs,PUH above A Fault @ 8350'. RIH pumping 1.8 bpm @ 50 ft/min, slight CT bobble,PU through zone, clean,RBIH 1.2 bpm 50 ft/min,saw slight bobble W 2 k CT Wt slack off @ 8464'. Continue to RIH. 6/15/2017 6/15/2017 0.60 PROD1 DRILL DISP T POOH from fish laying in 34 bbl 10.5 9,564.0 7,912.0 08:06 08:42 ppg beaded liner running pill to above the top of loss zone,7958'. 6/15/2017 6/15/2017 0.80 PROD1 DRILL TRIP P Paint EOP,end of pipe flag @ 7,912.0 5,262.0 08:42 09:30 7912.37'(Yellow),continue to POOH, paint window flag @ 5262.45(White) 6/15/2017 6/15/2017 1.00 PROD1 DRILL TRIP P Continue to POOH pumping 8.7 ppg 5,262.0 55.0 09:30 10:30 Power pro lite W 2.5%clay stop. Page 18/37 Report Printed: 7/3/2017 • • = 41, Operations Summary (with Timelog Depths) ice, r "h 1 0-1 5 ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start lime End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/15/2017 6/15/2017 1.10 PROD1 DRILL PULD P Bump up,space out,open bleeder on 55.0 0.0 10:30 11:36 stack to half drum,fill hole till returns to drum,observe flow,well on a vac. PJSM,hole fill in—30 min 1.6 bbls, Lay down BHA#16 over a dead well. 6/15/2017 6/15/2017 0.40 COMPZI CASING PUTB P Prep floor for liner running,PJSM. 0.0 0.0 11:36 12:00 6/15/2017 6/15/2017 2.40 COMPZ1 CASING PUTB P PU and make up 42 joints of (2 3/8", 0.0 1,665.0 12:00 14:24 4.6#,L-80,ST-L Slotted Liner),over a ported bull nose and topped with a shortly deployment sleeve. (1665.13') Filling the hole every 5 joints. 6/15/2017 6/15/2017 0.40 COMPZ1 CASING PULD P PU BHA#17,coil track and Baker 1,665.0 1,709.0 14:24 14:48 hydraulic GS,close rams,stab injector,open up,EDC closed. Total hole fill 13.3 bbls 6/15/2017 6/15/2017 1.40 COMPZ1 CASING RUNL P RIH W liner,line up 8.7 pg beaded 1,709.0 7,162.0 14:48 16:12 liner running pill. Tie into flag for- 11.68'correction. 6/15/2017 6/15/2017 1.30 COMPZ1 CASING RUNL T While RIH @ 50 ft/min,stick became 7,162.0 7,162.0 16:12 17:30 unresponsive. Atempted to dial down torque to injector to stop forward progress,unsucessfull. Set injector brake to stop forward motion. Pulled up hole so that bottom of liner is above the window and parked.Built new liner running pill. Install new stick. 6/15/2017 6/15/2017 3.00 COMPZ1 CASING RUNL T Test/adjust new stick while POOH, 7,162.0 6,959.0 17:30 20:30 RIH.New stick does not appear to solve the issue while RIH,trouble shoot HMI inputs to understand the issue better(injector string weight set points&WOB set points appear to intermitently work to stop forward progress of pipe),set brakes&reboot HMI without success in solving the issue.A set point of coil speed=30 fpm works,when setting coil speed= 40 fpm,the brake is required to stop forward progress of pipe,which apprears successful every test.Await mechanic to begin to trouble-shoot encoders at Nabors request,reboot PLC's(programable logic controller), test,issue resolved. 6/15/2017 6/15/2017 0.60 COMPZ1 CASING CIRC P Pumping 40 bbl liner pill down 6,959.0 6,959.0 20:30 21:06 backside 6/15/2017 6/15/2017 2.10 COMPZI CASING RUNL P Continue to RIH with liner,weight 6,959.0 8,300.0 21:06 23:12 check at window,PUW=32K, observing increased WOB and negative CWT,PU&work liner at —8750', again at—8765'with PUW= 50K,again at 8780',8795',&8800', difficulty working pipe past 8826', begin building 2 50 bbl liner running pills to pump down back-side,PUH slowly Page 19/37 Report Printed: 7/3/2017 II w k • Operations Summary (with Timelog Depths) 1G-15 ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE) End Depth(ftKB) 6/15/2017 6/16/2017 0.80 COMPZ1 CASING RUNL P Pump at.65 bpm down coil in attempt 8,300.0 8,500.0 23:12 00:00 to work liner down while awaitinig liner pill(pumps off when PUH to not release off GS),unsuccessful,begin pumping 50 bbl pill down back-side at 23:50 hrs. 6/16/2017 6/16/2017 0.40 COMPZ1 CASING CIRC P Pumping 100 bbl liner pill down back- 8,500.0 7,961.0 00:00 00:24 side 6/16/2017 6/16/2017 0.90 COMPZ1 CASING RUNL P Liner pill to window,RBIH with liner at 7,961.0 9,545.0 00:24 01:18 50 fpm,continue to bull-head at reduced rate while RIH to get pill to fractures at-7950'(.9 bpm),-15K CWT at 7960'when begin RIH, 15K CWT at 8600', 13K CWT at 8875. Arrive at set depth,weight check= 40K,RBIH to set depth,bring up pumps,release off liner,PUW=32K 6/16/2017 6/16/2017 1.70 COMPZ1 CASING TRIP P POOH to LD BHA#17,tag up 9,545.0 27.0 01:18 03:00 6/16/2017 6/16/2017 1.50 COMPZ1 CASING PULD P PJSM,flow check,open bleeder, 27.0 0.0 03:00 04:30 flowing,shut-in choke,WHP rises, well is flowing with 8.64 ppg fluid in the hole, PUD BHA#17 6/16/2017 6/16/2017 1.00 COMPZ1 CASING PULD P PU BHA#18 27.0 0.0 • 04:30 05:30 6/16/2017 6/16/2017 1.00 COMPZ1 CASING PULD P PD BHA#18,inspect pack offs. 0.0 81.0 05:30 06:30 6/16/2017 6/16/2017 1.60 COMPZ1 CASING RUNL P Bump up,set counters,RIH 81.0 6,445.0 06:30 08:06 6/16/2017 6/16/2017 0.20 COMPZ1 CASING DLOG P Tie into the HRZ for a-7'correction 6,445.0 6,473.0 08:06 08:18 6/16/2017 6/16/2017 0.20 COMPZ1 CASING RUNL P Comtinue to RIH, 6,473.0 6,949.0 08:18 08:30 6/16/2017 6/16/2017 0.50 COMPZ1 CASING RUNL P Park,Pumps down,close EDC,High 7,949.0 7,880.0 08:30 09:00 side anchored billet,line up across the top pumping managed pressure,PU Wt 30 k lbs,continue to RIH. 6/16/2017 6/16/2017 0.20 COMPZ1 CASING- RUNL P SD @ 7880'.tool highside,Line up 7,880.0 7,880.0 09:00 09:12 down the coil,PU to neutral CT wt- 30 k lbs,roll the pumps against a closed choke. CT pressure broke back @ 3800 psi,Slack off CT weight WOB climed to 6.7 k lbs,Anchors set and holding. 6/16/2017 6/16/2017 1.60 COMPZ1 CASING TRIP P Line up across the top pumping 7,880.0 71.0 09:12 10:48 managed presure,POOH W BHA#18. 6/16/2017 6/16/2017 1.10 COMPZ1 CASING PULD P PJSM,Bump up,Checks holding, 71.0 0.0 10:48 11:54 PUD BHA#18,LD 6/16/2017 6/16/2017 1.30 PROD2 STK PULD P PU BHA#19 AL1 lateral drilling 0.0 71.0 11:54 13:12 assembly,PJSM,PD BHA,check . pack offs. 6/16/2017 6/16/2017 1.20 PROD2 STK TRIP P Bump up,set counters, RIH,park @ 71.0 4,832.0 13:12 14:24 1026',close EDC,Test agitator- good,open EDC, continue to RIH. Page 20/37 Report Printed: 7/3/2017 41, 2 Operations Summary (with Timelog Depths) 1G-15 • Conooz hiilips F,3.r.ks Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth.(ftKB) 6/16/2017 6/16/2017 7.60 PROD2 STK RGRP T Storage reel locked outwhile running 4,932.0 4,767.0 14:24 22:00 in hole.confer with town,create plan forward Plan Forward: Complete welding pins(good),replace all bolts on off-reel side(good), inspect goose-neck(good),inspect flange bolts from master valve up (good),PUH and inspect pipe(good), RIH and PUH at various speeds while evaluating injector&software(good). Continue with CTD operations. 6/16/2017 6/16/2017 0.40 PROD2 STK TRIP P Continue RIH 4,767.0 6,415.0 22:00 22:24 6/16/2017 6/16/2017 0.10 PROD2 STK DLOG P Tied into HRZ for a-6'correction 6,415.0 6,500.0 22:24 22:30 6/16/2017 6/16/2017 0.40 PROD2 STK TRIP P Continue RIH,close EDC 6,500.0 6,950.0 22:30 22:54 6/16/2017 6/17/2017 1.10 PROD2 STK WAIT T Difficulty stopping forward progress of 6,950.0 6,950.0 22:54 00:00 pipe,similar issue from yesterday, reboot PLC's and rectifier,no success, continue to test&troubleshoot,open EDC Notice fluid leak at R5 flange,tightend flange bolts,resolved. 6/17/2017 6/17/2017 5.00 PROD2 STK WAIT T Continue to trouble-shoot coil RIH 6,950.0 6,959.0 00:00 05:00 issue,replace reel motor encoder. ARP is on the way to CDR3 from lower 48 6/17/2017 6/17/2017 1.50 PROD2 STK WAIT T Start up pumps after total rig sut down 6,950.0 6,959.0 05:00 06:30 during testing.pumping 1.36 bpm, Duovis 2.5%clay stop in 6%KCL, zero wellhead and 2882 annular,built to 3433 psi annular and 500 psi WH at depth. Swap from pumping down the coil to over the top,lined up managed pressure and staged down to target of 40 psi WH,stabilized rate of—0.8 bpm and annular of 3275 psi. Changed out three encoders,one was the main. 6/17/2017 6/17/2017 1.70 PROD2 STK WAIT T PUH to 5800'at various rates from 20 6,950.0 6,427.0 06:30 08:12 ft/min to 80 ft/min. No stick issues. RBIH at variable speeds to 100 ft/min while observing the Bonitron (contactor to the resistor that loads the VFD drives when they are stopped) observed cooler fan not turning on. No stick issues. 6/17/2017 6/17/2017 1.20 PROD2 STK WAIT T Swap back to high line power,PU to 6,427.0 5,800.0 08:12 09:24 5800'. Page 21/37 Report Printed: 7/3/2017 '<S t • . VIII Operations Summary (with Timelog Depths) 1G-15 ConocoPhillips Af.zsk.+ Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/17/2017 6/17/2017 1.20 PROD2 STK WAIT T RBIH at various speeds to 6400',no 5,800.0 6,195.0 09:24 10:36 issues, PUH to 5800'repeat,saw issue RIH @ 60ft/hr and saw the dead stick issue. Continue to RIH and atempt to stop. From 60 ft/sec if the stick is brought abruptly to neutral the RIH speed is dropping but not at a , quick enough rate,the break sets after 7 sec. From 60 ft/min approx 50ft/min in 7 sec. When pulling the stick back slowly the RIH speed responded appropriatly. When running at 40 ft/min and changing the set point in the HDMI controller to 30 ft/min it took 20 sec to change. 6/17/2017 6/17/2017 2.10 PROD2 STK WAIT T Verified comms between the stick and 6,195.0 6,195.0 10:36 12:42 the encoders. Took more readings and contacted Peter WI AARP. Wait on ARP. While pulling up hole on the last trip lost Nabors depth control,still have Baker depth control. 6/17/2017 6/17/2017 3.30 PROD2 DRILL WAIT T POOH @ 70 ft/min,error,"dynamic 6,195.0 5,797.0 12:42 16:00 break resistor alert"park coil at 6088'. clear fault, RIH,stick operating normally,POOH to gain some space, RBIH,stick worked as it should with quick soft stop of injector travel and reel. Continued to RIH and POOH w various effects. Typical stop times 4-5 sec from 50-100 ft/min speed typical travel past neutral stick is approx 5' 6/17/2017 6/17/2017 1.00 PROD2 STK WAIT T S/D pumps,close EDC,line up down 5,797.0 5,995.0 16:00 17:00 the coil at 0.8 bpm,—880 psi diff. Set auto drill parameters to kick out at 800 psi,auto drill functioned as it should. Restarted,lowered pump rate auto drill engaged,increased pump rate above set kick out and kicked out • instantly. S/D pumps,open EDC, Line up down the back side on managed pressure holding—400 psi WH @ 0.8 bpm and annular of 2900 psi. Update town and decide to move forward with drilling. Trip in hole to tie in. 6/17/2017 6/17/2017 0.20 PROD2 STK TRIP P Trip to logging point 5,995.0 6,445.0 17:00 17:12 6/17/2017 6/17/2017 0.20 PROD2 STK DLOG P Tie into the HRZ for a+4.5'. 6,445.0 6,465.0 17:12 17:24 6/17/2017 6/17/2017 1.40 PROD2 STK TRIP P Continue to RIH,weight check at 6,465.0 7,860.0 17:24 18:48 window 31K,dry tag TOB at 7860' Page 22/37 Report Printed: 7/3/2017 � . 74, • • Operations Summary (with Timelog Depths) 1G-15 ConocoPhi€lips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/17/2017 6/17/2017 2.20 PROD2 STK KOST P Kicking off billet at 7860',30°ROHS, 7,860.0 7,870.0 18:48 21:00 pumping 1.6 bpm,difficulty getting started on billet FS=900 psi,CWT= 16.7K,WOB=.7K,WHP=640 psi,dp =—900 psi,WHP increases to 644 psi, WHP increases to 800 psi,drops back to 685 psi,pump 5 bbl of excess liner pill to aid in weight transfer. Note:Pre-load PDL while KO billet, 6/17/2017 6/17/2017 0.60 PROD2 DRILL DRLG P Off billet drilling ahead,CWT=12.6K, 7,870.0 7,900.0 21:00 21:36 WOB=1.7K,ROP—80 fph,PUW from 7900 is 32K,dry drift billet area up& C, down,clean 6/17/2017 6/18/2017 2.40 PROD2 DRILL WAIT T PU into cased hole,shut-down pumps 7,900.0 6,910.0 21:36 00:00 in attempt to hold 500 psi WHP(per town request to see if drilling on open choke is possible),WHP did not hold at 500 psi,open EDC,bring pumps back up,replace Bonitron breaker relay in attempt to resolve injector/reel issues,test. 6/18/2017 6/18/2017 1.00 PROD2 DRILL WAIT T Continue with Bonitron breaker relay 6,910.0 6,910.0 00:00 01:00 replacement.Begin testing PUH& RIH at various speeds.The replacement appears to have solved the issue,reducing the voltage over the relay below the limp-mode of —980V down to—920V,shifting the entire volatage range down.RIH and PUH speeds of up to 100 fpm, stopping&stick control operate as expected during testing. Close EDC,begin RIH to resume CTD ops 6/18/2017 6/18/2017 0.50 PROD2 DRILL TRIP P RIH,tie-in for+2'correction,stall 6,910.0 7,900.0 01:00 01:30 getting down to bottom at 7889', 6/18/2017 6/18/2017 2.00 PROD2 DRILL DRLG P BOBD,pumping 1.8 bpm,CWT=10K, 7,900.0 8,020.0 01:30 03:30 WOB=1.5K,FS=1100 psi,WHP= 647 psi,began sending 5 bbl pill (1.5%776),ROP from 50-250 fph. Note:PU off bottom to get/check surveys&tools at 2:15&3:15 am, one survey indicates possible—30° DLS. 6/18/2017 6/18/2017 2.80 PROD2 DRILL DRLG P BOBD,pumping 1.8 bpm,CWT= 8,020.0 8,124.0 03:30 06:18 9.5K,WOB=1.3K,WHP=631 psi, ROP= 150 fph,rig geologist believes likely in the Siderite cap b/w fractures, variable ROP requiring PU's,PUW's= —33K,squatting down to 0.1K,begin sendiing 5 bbl pill at 8049'. 6/18/2017 6/18/2017 0.60 PROD2 DRILL WPRT P PU,pull wiper early to pump lube pill 8,124.0 6,958.0 06:18 06:54 down our backside,PO Wt 43k lbs, Page 23/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) 1G-15 ConocoPh'Hiips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (5KB) End Depth(ftKB) 6/18/2017 6/18/2017 0.60 PROD2 DRILL DISP P Pull above window,line up down the 6,958.0 7,043.0 06:54 07:30 back side,Pump 47 bbls of liner running pill,lubes and beads,down the coil by 4.5"tubing annulus. Beaded lub pill extends from surface to—4150'. 6/18/2017 6/18/2017 0.20 PROD2 DRILL DLOG P RBIH,tie into the RA tag for a+2 foot 7,043.0 7,067.0 07:30 07:42 correction. 6/18/2017 6/18/2017 0.50 PROD2 DRILL TRIP P Continue to RIH to bottom. See WOB 7,067.0 8,124.0 07:42 08:12 spikes at 7185'2.8k,7538'1 k,7631' 3.34 k lbs,small weight bobble @ 7860'when passing the window. 6/18/2017 6/18/2017 0.30 PROD2 DRILL DRLG P Set rate 1.78 bpm,choke still closed, 8,124.0 8,130.0 08:12 08:30 WH994 ,CT4390 psi,Free spin diff 1022 psi. BOBD,WOB.8 k lbs,ROP 24 ft/hr Drill ahead 6',in that time well head climbed to 1100 psi and held breifly then continued to 1400 psi. 6/18/2017 6/18/2017 1.30 PROD2 DRILL WPRT P PU Wt 33 k lbs,PUH,WH increased 8,130.0 6,894.0 08:30 09:48 the 1500,dropping rate to maintain pressure,cracked choke and bring rate back up to 1.8 bpm,continue to POOH. Saw some over pull to 48 CT Wt,clean was 38-40k starting©7945' Work pipe and continue to POOH to the window. 6/18/2017 6/18/2017 0.60 PROD2 DRILL CIRC P Park above the window. S/D pumps 6,894.0 6,850.0 09:48 10:24 and observe pressures,WH 870 Annular 3787,in—4 min pressures fell to 505 WH and 3398 psi annular. On line with the pumps holding 400 psi and pumping 0.5 bpm,consult with town regarding choke position. 6/18/2017 6/18/2017 1.10 PROD2 DRILL CIRC P Open EDC and test rate returns. 6,850.0 6,840.0 10:24 11:30 Crack choke targeting 10.0 ppg heavy while increasing to drilling rate. 1.80 bpm in, 1.6 bpm out holding 10.2 ppg EDC,505psi WH and 3389 psi annular. 6/18/2017 6/18/2017 0.50 PROD2 DRILL TRIP P Open EDC,pump 5x5 sweep and 6,840.0 8,130.0 11:30 12:00 chase down coil,close EDC,RIH, minor WOB spikes from 0.5 k to 1 k @ 7090,7163,7155,7189'. No motor work 6/18/2017 6/18/2017 0.20 PROD2 DRILL WPRT P Tag bottom,PU 33 k lbs,Bring pumps 8,130.0 8,130.0 12:00 12:12 to 1.80 bpm, 1.60 bpm out,PUH slowly to 8090' observing pressures. All good,RBIH. 6/18/2017 6/18/2017 3.30 PROD2 DRILL DRLG P 1.8 bpm in,1.6 bpm out,WH 180, 8,130.0 8,410.0 12:12 15:30 annulus 3347 psi,CT 4125 psi,free spin diff 1012 psi OBD,CT Wt 6.2 k lbs,WOB 1.9 k lbs, ROP 70 ft/hr,monitored pressures, slowly visc'd up the duo vis system and drilled ahead. Losses still—1/8 bpm.PU Wt 33-35 k lbs. **85 ft/min ROP over interval on bottom,note held rate to 75-85 for first hour,hit hard stuff&drilled last section @ 200ft/hr Page 24/37 Report Printed: 7/3/2017 i • • Operations Summary (with Timelog Depths) 1G-15 coP1 ii ps airnA, Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKl3) 6/18/2017 6/18/2017 0.50 PROD2 DRILL WPRT P PU on1370',wiper to just below 8,410.0 7,055.0 15:30 16:00 window to clean up and verify build status. Pu 30 k lbs. 6/18/2017 6/18/2017 0.20 PROD2 DRILL WAIT T Upon attempting to RBIH,storage reel 7,050.0 7,055.0 16:00 16:12 locked out. 6/18/2017 6/18/2017 5.80 PROD2 DRILL WAIT T PUH above window,park,S/D pumps, 7,055.0 6,965.0 16:12 22:00 attempt to open EDC,diff not comming down,attempt to jog, storage reel locked out,open EDC, atempt to RBIH,reel locked out 3rd time. Pump bottoms up @ 2.22 bpm in,2.06 bpm out. Remain parked circulating,confer with town,decison made to POOH,continue parked at 6965'allowing electrician time to prepare to POOH. Nabors in contact with Peter from ARP,Peter indicated that he has modified the existing"code"to brake/lock-out the storage real— 2seconds after the injector,given an over voltage lock-out situation.ARP will install the modified logic to CDR3 tomorrow for testing(6/19). Additionally,Nabors attempting to aquire a replacement Bonitron (Bonitron headquarters currently closed).Rate In=.5 bpm,Rate out =.4 bpm. 6/18/2017 6/19/2017 2.00 PROD2 DRILL TRIP T Begin POOH at 5 fpm to LD BHA, 6,965.0 6,519.0 22:00 00:00 tripping on 10 ppg schedule,stop at 6912',allow Nabors&ARP time to gather data,continue POOH at 5 fpm, increase POOH speed to 10 fpm at 6880', increase speed to 15 fpm at 6,600'. Unable to continue to POOH at 6819'(stuck pipe,likely packed-off), increase rate to 1.67 bpm,unable to orient,gain ability to orient,believe packed-off betwee EDC and HOT at thihs point,confer with town 6/19/2017 6/19/2017 0.30 PROD2 DRILL TRIP T Confer with town,decision made to 6,519.0 6,526.0 00:00 00:18 RIH at 1 fpm in attempt to become un- stuck,bring down pumps,close EDC 6/19/2017 6/19/2017 2.40 PROD2 DRILL TRIP T Begin POOH,bring rate up to 1.5 6,526.0 61.0 00:18 02:42 bpm,observe no rate out,followed by sudden rate out,and pressure drop indicating pack-off released,continue POOH at 15 fpm,bring speed up to 30 fpm,pump 10 bbl hi-vis sweep, increase POOH speed to 60 fpm once bottoms up reached,tag-up,space out 1.2'at 1 fpm as discussed with town, open EDC 6/19/2017 6/19/2017 1.40 PROD2 DRILL PULD T PJSM,PUD BHA#19,checks not 61.0 0.0 02:42 04:06 holding. Page 25/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) r. tit 1G-15 ConocoPhiilips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (5KB) End Depth(ftKB) 6/19/2017 6/19/2017 10.40 PROD2 DRILL WAIT T Nabors&ARP troubleshoot, 0.0 0.0 04:06 14:30 replace/troubleshoot Bonitron,upload new logic to CDR3 braking system Replacement Bonitrons identified in Houston,shipping arrangements being made. 6/19/2017 6/19/2017 2.60 PROD2 DRILL WAIT T PJSM,check checks in Upper Quick, 0.0 4,112.0 14:30 17:06 RU nozzle,Stab on,PT,open up the well,line up down the coil pumping managed pressure. Prepare to creep in hole,service side VFD high DC buss voltage alarm at drillers HMI screen,no alert on either remote screens. Investigation shows programming change of High voltage was transposed,actual high voltage is sub side. Noted that alarms are not showing on all screens,action item. Continue to RIH,staging up speeds to 100 ft/min,stopping as we go. When stopping from 100 ft/min saw high voltage alarm. Continue on into hole observing voltage,4112'13.38 k lbs CT Wt,voltages continued to climb, saw up to 971 volts with no attempt to break voltage to resistor. Terminate testing and POOH. BT#1 not functioning as it should. 6/19/2017 6/19/2017 1.40 PROD2 DRILL WAIT T POOH,pop off. 4,112.0 0.0 17:06 18:30 6/19/2017 6/20/2017 5.50 PROD2 DRILL WAIT T Wait on parts 0.0 0.0 18:30 00:00 6/20/2017 6/20/2017 12.30 PROD2 DRILL WAIT T Wait on parts,2 Bonitron brake 0.0 0.0 00:00 12:18 transitor units enroute to Anchorage, arrive in Anchorage at 8:00 am, Lyndon delivered the parts to Security Aviation who will deliver to Deadhorse by—12:00 noon. 6/20/2017 6/20/2017 1.00 PROD2 DRILL WAIT T Parts enroute from Deadhorse to rig. 0.0 0.0 12:18 13:18 6/20/2017 6/20/2017 2.20 PROD2 DRILL WAIT T Parts arrive at rig,install Bonitron, 0.0 15.0 13:18 15:30 PJSM, pull night-cap,PU nozzle&. stinger,RIH to test new Bonitron. 6/20/2017 6/20/2017 1.70 PROD2 DRILL TRIP T RIH to begin testing at 20 fpm,come 15.0 6,000.0 15:30 17:12 up to 30 fpm,up to 40 fpm,up to 50 fpm,up to 80 fpm,up to 100 fpm and perform slow deceleration at 1000', continue braking tests at 40,60,80,& 100 fpm(operating as expected, chopping voltage to resistor).Continue to RIH to 4000'at 100 fpm.Begin testing braking at 40,60,80,&100 fpm,30 second run for each speed, then brake(functioning as expected), continue down to 6000'at 100 fpm, test braking at 40,60,80,&100 fpm (good tests) 6/20/2017 6/20/2017 1.30 PROD2 DRILL TRIP T Test-PASS,Trip out for drilling BHA 6,000.0 0.0 17:12 18:30 Page 26137 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) sem, .4 , ; 1G-15 ConocoPtdtiips A:.nA,a Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/20/2017 6/20/2017 0.50 PROD2 DRILL PULD T At surface,PJSM,Lay down pup joint 0.0 0.0 18:30 19:00 and nozzle 6/20/2017 6/20/2017 1.50 PROD2 DRILL PULD T PJSM,PD BHA#22,AL1 lateral BHA 0.0 78.2 19:00 20:30 with.8°AKO motor,RB HYC Bi center,and agitator.Make up to coil and surface test,Check pack offs,Tag up and set counters 6/20/2017 6/20/2017 1.60 PROD2 DRILL TRIP T RIH BHA#22,test agitator at 200'- 78.2 6,440.0 20:30 22:06 Good,Test HOT @ 2300-Good 6/20/2017 6/20/2017 0.10 PROD2 DRILL DLOG T Log HRZ for-5'correction 6,440.0 6,477.0 22:06 22:12 • 6/20/2017 6/20/2017 0.80 PROD2 DRILL TRIP T Continue in well,Clean pass through 6,477.0 8,089.0 22:12 23:00 window 6/20/2017 6/20/2017 0.70 PROD2 DRILL TRIP P Stack out and pick up,work pipe 8,089.0 8,416.0 23:00 23:42 gently to bottom,END NAD NPT,23 Hrs for today 6/20/2017 6/21/2017 0.30 PROD2 DRILL WPRT P Tag bottom @ 8416,Pull wiper to 8,416.0 7,760.0 23:42 00:00 window,PUW=32K 6/21/2017 6/21/2017 1.30 PROD2 DRILL WPRT P Continue wiper trip to window.Tight 7,760.0 8,415.0 00:00 01:18 spot @ 7350 RIH 6/21/2017 6/21/2017 0.10 PROD2 DRILL DRLG P 8415',Drill, 1.78 BPM @ 4470 PSI 8,415.0 8,425.0 01:18 01:24 FS,BHP=3500,ROP=175FPH 6/21/2017 6/21/2017 0.30 PROD2 DRILL WPRT P 8425',Hit hard spot,Lost all returns, 8,425.0 8,425.0 01:24 01:42 PUH,PUW=45K,PUH to 8310.RBIH to drill 6/21/2017 6/21/2017 1.70 PROD2 DRILL DRLG P 8425',Drill 1.7 BPM @ 4230 PSI FS, 8,425.0 8,454.0 01:42 03:24 BHP=3348.Returns slowing came back to 1.78 in to 1.30 Out.ROP=20 FPH 6/21/2017 6/21/2017 4.00 PROD2 DRILL DRLG P 8454',Drilling break,ROP=110- 8,454.0 8,659.0 03:24 07:24 125FPH,1.79 IN, 1.33 OUT, WHP=165,ECD 10.3 6/21/2017 6/21/2017 0.60 PROD2 DRILL DRLG P Continue drilling ahead,begin adding 8,659.0 8,662.0 07:24 08:00 1%lube to system once past 8650'(fault zone),Rate In=1.8 bpm, Rate Out=1.4 bpm,CWT=.47K, WOB=1.7K,WHP=238 psi,pump 5x5 sweep at 8660',observing ' significant vibrations drilling on hard spot,reduce rate to 1.6 bpm in attempt to reduce vibration,PUW= 35K, 6/21/2017 6/21/2017 0.40 PROD2 DRILL TRIP P Notice haze by the reel on monitor in 8,662.0 8,662.0 08:00 08:24 doghouse(possibly sun glare),PU, send crew to inspect(mechanic& electrician),notice residual oil on ' heater,thought to be cause,noticable oder,though no visual,continue drilling, 6/21/2017 6/21/2017 1.60 PROD2 DRILL DRLG P BOBD,pumping 1.8 bpm,Rate Out= 8,662.0 8,714.0 08:24 10:00 1.4 bpm,sweep exits bit, FS=1050 psi,CWT=6.5K ,WOB=2.5K,WHP =223 psi,PU for BHA wiper,PUW= 31K,increase mud system to 1%776 from no lube&begin sending 6/21/2017 6/21/2017 0.50 PROD2 DRILL DRLG P Mud w/increased lube at the bit,BHA 8,714.0 8,756.0 10:00 10:30 wiper,PUW=47K, pumping 1.8 bpm, -78%returns,continue drilling,CWT =3.3K,WOB=.5K Page 27/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) ' i ?-' rR: 1G-15 Coochitliips=a n hJ r,A.x Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/21/2017 6/21/2017 0.40 PROD2 DRILL WPRT P Stuggling with weight transfer,pull 8,756.0 7,900.0 10:30 10:54 early wiper,PUW=48K,PUH at 35 fpm to keep up AV's, 6/21/2017 6/21/2017 0.50 PROD2 DRILL WPRT P Wiper back in-hole,RIW=14K, PUH 7,900.0 8,756.0 10:54 11:24 100'right before bottom to allow , electrician to gather data,PUW=34K 6/21/2017 6/21/2017 1.40 PROD2 DRILL DRLG P BOBD,FS=1010 psi,CWT=5K, 8,756.0 8,778.0 11:24 12:48 WOB=2.2K,Rate In=1.8 bpm,Rate Out=1.45 bpm,WHP=210 psi,dp= 1300 psi,low ROP spots with Siderite showing over shakers. 6/21/2017 6/21/2017 1.70 PROD2 DRILL DRLG P Broke out of hard spot,continue 8,778.0 8,907.0 12:48 14:30 drilling with—80%returns,CWT=7K, WOB=1.4K,ROP=165 fph,WHP= 260 psi,hard spots knocked near bit Inc down from 95°to 87.5°(25°DLS), continue to try and break through. 6/21/2017 6/21/2017 1.00 PROD2 DRILL DRLG P Continue drilling ahead at 8907', 8,907.0 8,970.0 14:30 15:30 continue to get knocked down(near bit inc.)attempting to break through hard layer,CWT=6K,WOB=.9K, difficulty making our build,confer with geology,decision made to put it into turn to stay within polygon,difficulty making turn getting bounced off of hard lithology,continual PU's"47K to keep moving, 6/21/2017 6/21/2017 3.00 PROD2 DRILL TRIP T Confer with town,decision made to 8,970.0 58.2 15:30 18:30 POOH for high AKO motor, PUW= 34K,7080'motor work in the build,, RBIH to 7400',slight bobble at 7230' on way back in,at 6400'RBIH 300', Open EDC,bring rate to 2.2 bpm. 6/21/2017 6/21/2017 1.50 PROD2 DRILL PULD T At surface,PJSM PUD BHA#22,Bit 58.2 0.0 18:30 20:00 out 1-2 Chipped tooth,Balled up,30 min reconfig BHA,Not pre loaded running same coil track,AVG DLS=9.6°with.8°motor 6/21/2017 6/21/2017 1.10 PROD2 DRILL PULD T PJSM,PD BHA#22 AL1 lateral 0.0 78.2 20:00 21:06 section with 1.1°AKO motor,RB HYC bit and RR agitator.M/U to coil and surface test 6/21/2017 6/21/2017 1.30 PROD2 DRILL TRIP T Trip in well,Test orienter-Good,Test 78.2 6,420.0 21:06 22:24 Agitator-Good 6/21/2017 6/21/2017 0.20 PROD2 DRILL DLOG T Tie into HRZ for-3.5' 6,420.0 6,472.0 22:24 22:36 6/21/2017 6/21/2017 1.30 PROD2 DRILL TRIP T Continue in well,Stack out at 7548 6,472.0 8,975.0 22:36 23:54 and 8180' 6/21/2017 6/21/2017 -PROD2 DRILL DRLG P 8975'Drill, 1.8 BPM @ 4480 PSI FS, 8,975.0 8,994.0 23:54 23:54 BHP=3510,Return rate=1.5, WHP=245 6/22/2017 6/22/2017 0.70 PROD2 DRILL DRLG P 8994',Drill 1.8 BPM @ 4480 PSI FS, 8,994.0 9,039.0 00:00 00:42 BHP=3510,DHWOB=1.4K,RIW=-4K, ROP=150.Initial surveys 3°avg, Reduce rate,put as much WOB as practical.Pump low vis lubed pill @ 9039'to gain WOB, little result. 6/22/2017 6/22/2017 0.10 PROD2 DRILL WPRT P BHA Wiper, PUW=36K 9,039.0 9,039.0 00:42 00:48 , Page 28/37 Report Printed: 7/3/2017 , • • ' Operations Summary (with Timelog Depths) z v� r 6.. r.. s 1G-15 ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/22/2017 6/22/2017 0.50 PROD2 DRILL DRLG P 9039', Drill, 1.7 BPM @ 4575 PSI FS, 9,039.0 9,061.0 00:48 01:18 BHP-3450,RIW=0,DHWOB=.8.Low DLS. Low DHWOB.Pump beaded pill 6/22/2017 6/22/2017 0.70 PROD2 DRILL WPRT P PUH waiting on beaded pill.Close to 9,061.0 9,061.0 01:18 02:00 edge of polygon,PUW=45K 6/22/2017 6/22/2017 0.80 PROD2 DRILL DRLG P 9061',Drill,1.7 BPM @ 4575 PSI FS, 9,061.0 9,151.0 02:00 02:48 BHP=3500,RIW=-6K with DHWOB- 1.3K,ROP=105,At 9112 reduce pump rate to 1.45BPM to increase DLS,Avg DLS to 9151 15.2° 6/22/2017 6/22/2017 0.20 PROD2 DRILL WPRT P Stacked out,Pull BHA Wiper, 9,151.0 9,151.0 02:48 03:00 PUW=36K 6/22/2017 6/22/2017 4.00 PROD2 DRILL DRLG P 9151',Drill 1.7 BPM @ 4070 PSI FS, 9,151.0 9,361.0 03:00 07:00 BHP=3467 6/22/2017 6/22/2017 0.60 PROD2 DRILL WPRT P Wiper up-hole,PUW=42K 9,361.0 8,200.0 07:00 07:36 6/22/2017 6/22/2017 0.70 PROD2 DRILL WPRT P Wiper in-hole,begin pumping 10 bbl 8,200.0 9,361.0 07:36 08:18 beaded pill,observe some WOB at —9240&9275',PU at 9281',PUW= 39K,RIW=11K at 9300' 6/22/2017 6/22/2017 3.00 PROD2 DRILL DRLG P BOBD,pill begins exiting bit, 9,361.0 9,422.0 08:18 11:18 significant gain in weight transfer,FS =1005 psi,CWT=3.5K,WOB= 1.2K,dp=1172 ps,WHP=192 psi, continue pumping 10 bbl beaded pills as required,low ROP&vibrations through hard drilling. 6/22/2017 6/22/2017 1.60 PROD2 DRILL DRLG P Continue drilling at 9,422',CWT= 9,422.0 9,482.0 11:18 12:54 1.2K,WOB=1K,WHP=212 psi, returns—86%,variable ROP,2-135 fph,observed vibrations,continue pumping beaded pills as required. 6/22/2017 6/22/2017 3.10 PROD2 DRILL DRLG P Rate Out dropped to to.83 bpm at 9,452.0 9,570.0 12:54 16:00 9482',drilled ahead&returns began to recover quickly to 1.45 bpm out, CWT=-.6K,WOB=2K,Annular= 3569 psi,variable ROP 6/22/2017 6/22/2017 0.10 PROD2 DRILL WPRT P Pull 100'wiper trip,PUW=35K 9,570.0 9,570.0 16:00 16:06 6/22/2017 6/22/2017 1.10 PROD2 DRILL 'DRLG P OBD,CWT=-.2K,WOB=1.26,Rate 9,570.0 9,601.0 16:06 17:12 In=1.8 bpm,Rate Out=1.55 bpm, Annular=3556,continue to pump 10 bbl beaded pills as required 6/22/2017 6/22/2017 1.60 PROD2 DRILL WPRT P 9601',Wiper to 7900', PUW=39K 9,601.0 9,601.0 17:12 18:48 6/22/2017 6/22/2017 0.30 PROD2 DRILL DRLG P 9601',Drill,1.78 BPM @ 4690 PSI 9,601.0 9,622.0 18:48 19:06 FS,BHP=3510 6/22/2017 6/22/2017 - 0.30 PROD2 DRILL DRLG P 9622'Stall and stuck,worked free 9,622.0 9,622.0 19:06 19:24 58K,BHA wiper. 6/22/2017 6/22/2017 2.50 PROD2 DRILL DRLG P Work pipe trying to get back to 9,618.0 9,618.0 19:24 21:54 bottom.Sticky coming off bottom. Stalling near bottom Unsuccessful/. even with lower pump rates, PUW's=58K.Work down to 9618 6/22/2017 6/22/2017 0.30 PROD2 DRILL WPRT P Pull 300'wiper,still unable to get to 9,618.0 9,618.0 21:54 22:12 drilling,work to bottom and stall 6/22/2017 6/22/2017 1.50-PROD2 DRILL WPRT P Pull wiper to window with tie in,work 9,618.0 7,050.0 22:12 23:42 tight area @ 7700 to 7480' Page 29/37 Report Printed: 7/3/2017 ' • • �� . � Operations Summary (with Timelog Depths) , 1G-15 ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X i Operation (ftKB) End Depth(ftKB) 6/22/2017 6/22/2017 0.10 PROD2 DRILL DLOG P Log RA for+13',Clean encoder wheel 7,050.0 7,071.0 23:42 23:48 6/22/2017 6/23/2017 0.20 PROD2 DRILL WPRT P Continue wiper back in hole 7,071.0 7,260.0 23:48 00:00 6/23/2017 6/23/2017 1.10 PROD2 DRILL WPRT P Continue wiper trip in hole from 7,260.0 9,617.0 00:00 01:06 window 6/23/2017 6/23/2017 0.10 PROD2 DRILL DRLG P 9617',Drill, 1.6 BPM @ 3960 PSI FS, 9,617.0 9,625.0 01:06 01:12 BHP=3525,Hard to maintain drilling, RIW-8K,Hard to maintain differential pressure,Depth difference is due to 13 foot correction at tie in 6/23/2017 6/23/2017 1.50 PROD2 DRILL WPRT P Stall,PUW=58K,try different pump 9,625.0 9,625.0 01:12 02:42 rates,beaded pill,different run speeds.Unable to get steady state drilling 6/23/2017 6/23/2017 3.50 PROD2 DRILL WPRT P Geo's call TD,Pump 10 X 10 Sweeps, 9,625.0 59.0 02:42 06:12 Chase to swab,Encounter overpull 8119',RBIH and work area.Packing off @ 7650 area continue out 6/23/2017 6/23/2017 1.70 PROD2 DRILL, WPRT P RBIH to confirm TD,tie in for-5.5' 59.0 7,010.0 06:12 07:54 correction 6/23/2017 6/23/2017 0.30 PROD2 DRILL DLOG P Static at window,allow annular to drop 7,010.0 7,010.0 07:54 08:12 to 3282 psi to confirm 9.9 gradient(bit depth MD=7010',pressure tool depth =6962'MD,TVD at tool depth= 6376').Build liner pill&KWF to 10.1 ppg per liner running procedure. 6/23/2017 6/23/2017 1.70 PROD2 DRILL WPRT P Continue RIH to confirm TD,set down 7,010.0 9,625.0 08:12 09:54 9K at 7090'(3 tries to get by),set down 5K WOB at 7117', PUH to 7037',RBIH,set down 5K at 7539', —10K-12K CWT to TD,confirm TD at 9625',PUW=64K,send liner running pill • 6/23/2017 6/23/2017 3.30 PROD2 DRILL DISP P POOH,laying in 10.1 ppg liner running 9,625.0 78.0 09:54 13:12 pill&KWF to surface,paint EOP flags at 7868.19'&5178.19' 6/23/2017 6/23/2017 1.50 PROD2 DRILL PULD P PJSM,flow check,good,LD BHA#23, 78.0 0.0 13:12 14:42 electrician troubleshoot fan for dynamic brake,bit came out 2-2 6/23/2017 6/23/2017 3.60 COMPZ2 CASING PUTB P PJSM,PU BHA#24 AL1 Liner 0.0 1,790.7 14:42 18:18 Running Assembly Run#1 (non-ported bullnose,44 jnts slotted liner,shorty deployment sleeve), BOP drill:Kick While Running Liner(3 min),excellent execution,M/U to coil and surface test tool 6/23/2017 6/23/2017 1.10 COMPZ2 CASING RUNL P Trip in with AL1 lower liner segment, 1,790.7 6,904.9 18:18 19:24 EDC closed 6/23/2017 6/23/2017 0.10 COMPZ2 CASING DLOG P Correct-14 at flag,PUW=32K, 6,904.9 6,891.0 19:24 19:30 DHWOB=-6.3 6/23/2017 6/23/2017 1.20 COMPZ2 CASING ' RUNL P Continue in hole,Work pipe in 8800' 6,891.0 9,598.0 19:30 20:42 area.Clean past. Page 30/37 Report Printed: 7/3/2017 • • OMOperations Summary (with Timelog Depths) 1G-15 ConocoPhiiiips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(RKB) 6/23/2017 6/23/2017 0.20 COMPZ2 CASING RUNL P At set depth,Kick on pumps to 9,598.0 7,824.0 20:42 20:54 release.Drag liner uphole on first attemp, RBIH to depth.Pumps on 1.6 BPM in 1.5 BPM out,Release off liner, PUW=31K,DHWOB=.6.Remove liner length from counters left in hole 6/23/2017 6/23/2017 1.60 COMPZ2 CASING TRIP P Trip out keeping hole full 7,824.0 45.0 20:54 22:30 6/23/2017 6/23/2017 1.40 COMPZ2 CASING PULD P At surface,PJSM,Lay down BHA#24, 45.0 82.8 22:30 23:54 P/U BHA#25 with ported bull nose,1 9.92'pup-drilled,and OH anchor billet,Check pack offs,Make up injector and surface test tools 6/23/2017 6/24/2017 0.10 COMPZ2 CASING TRIP P RIH BHA#25,EDC open 82.8 144.0 23:54 00:00 6/24/2017 6/24/2017 1.20 COMPZ2 CASING TRIP P Continue in with BHA#25,ported 144.0 6,455.0 00:00 01:12 bullnose,drilled 9.9'pup,OH anchored billet 6/24/2017 6/24/2017 0.10 COMPZ2 CASING DLOG P Log HRZ for-4.5'correction 6,455.0 6,474.0 01:12 01:18 6/24/2017 6/24/2017 0.80 COMPZ2 CASING TRIP P Continue in well,Wt check @ 6996 for 6,474.0 7,856.0 01:18 02:06 31K,Shut EDC,Continue in,Tag up @ 7856,Orient to 150° ROHS,See tool shift @ 4100 PSI,Set down 2.5K- Good,Est TOL=7834' 6/24/2017 6/24/2017 1.60 COMPZ2 CASING TRIP. P Trip out of well 7,856.0 81.1 02:06 03:42 6/24/2017 6/24/2017 0.80 COMPZ2 CASING PULD P Surface,PJSM,Lay down BHA#25 81.1 0.0 03:42 04:30 6/24/2017 6/24/2017 0.80 PROD3 STK PULD P PJSM,M/U BHA#26(1°heavy AKO 0.0 83.0 04:30 05:18 motor,agtitator,B8 bit) 6/24/2017 6/24/2017 1.60 PROD3 STK TRIP P RIH 83.0 6,420.0 05:18 06:54 6/24/2017 6/24/2017 0.20 PROD3 STK DLOG P Tie for-4.5'correction 6,420.0 6,466.0 06:54 07:06 6/24/2017 6/24/2017 0.70 PROD3 STK TRIP P Continue RIH,dry tag TOB at 7835', 6,466.0 7,835.0 07:06 07:48 PUW=33K 6/24/2017 6/24/2017 1.10 PROD3 STK DISP P Displace well to 8.7 ppg drilling fluid 7,835.0 7,835.0 07:48 08:54 (PowerPro). 6/24/2017 6/24/2017 2.10 PROD3 STK KOST P KO billet 180°ROHS,pumping 1.6 7,835.0 7,846.0 08:54 11:00 bpm,Rate Out=1.57 bpm,FS=924 psi,aluminum over shakers observed, past slips and off billet at 7846'. 6/24/2017 6/24/2017 3.00 PROD3 DRILL DRLG P Drilling ahead,PU to dry drift billet 7,846.0 8,011.0 11:00 14:00 area,clean, pumping 1.8 bpm,Rate Out=1.73 bpm,FS=925 psi,CWT= 12K,WOB=1K,difficulty getting surveys,PU slowly allwing DD time to speak with town, Baker town indicates keep drilling ahead to aquire survey. 6/24/2017 6/24/2017 4.60 PROD3 DRILL DRLG P Continue drilling ahead,CWT=7.8K, 8,011.0 8,212.0 14:00 18:36 WOB=2.2K,BHP=3497 psi,able to get clean surveys,variable ROP 2- 220 fph. 6/24/2017 6/24/2017 0.30 PROD3 DRILL WPRT P Wiper up-hole to 7474,PUW=37K 8,212.0 7,474.0 18:36 18:54 Page 31/37 Report Printed: 7/3/2017 .. ! • Operations Summary (with Timelog Depths) 0,. ,rt , 1G-15 ConocoPhillips • Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/24/2017 6/24/2017 0.40 PROD3 DRILL WPRT P RBIH,Stack out @ 7544,work pipe, 7,474.0 7,040.0 18:54 19:18 stack out @ 7534,Pull wiper up to window 6/24/2017 6/24/2017 0.10 PROD3 DRILL DLOG P Log RA marker for+3.5' 7,040.0 7,058.0 19:18 19:24 6/24/2017 6/24/2017 0.90 PROD3 DRILL WPRT P RBIH,Shot check shots 7,058.0 8,214.0 19:24 20:18 6/24/2017 6/24/2017 0.50 PROD3 DRILL DRLG P 8214'Drill 1.77 BPM @ 5230 PSi FS, 8,214.0 8,214.0 20:18 20:48 BHP=3470.Entered high differential S/D pumps and pick up. High diff remaining off bottom.Back to normal free spin.Stall on bottom,PUH still in high diff.Suspect motor problems, Unable to drill ahead 6/24/2017 6/24/2017 1.70 PROD3 DRILL TRIP T POOH for BHA inspection 8,214.0 68.8 20:48 22:30 6/24/2017 6/24/2017 1.10 PROD3 DRILL PULD T At surface,Tag up and space out, 68.8 0.0 22:30 23:36 PJSM PUD BHA#26,During PUD FVS not holding,Review undeploy with failed FVS procedure,Shut EDC and continue PUD. 6/24/2017 6/25/2017 0.40 PROD3 DRILL BHAH T Investigate BHA,Bit out clear, Motor 0.0 0.0 23:36 00:00 drained normally.Valve in FVS stuck open-beads.Agitator operated normally with water/air in mouse hole 6/25/2017 6/25/2017 0.30 PROD3 DRILL BHAH T Continue to inspect/reconfigure BHA 0.0 0.0 00:00 00:18 6/25/2017 6/25/2017 1.00 PROD3 DRILL PULD T PJSM,PD BHA#27,surface test tool 0.0 78.2 00:18 01:18 6/25/2017 6/25/2017 1.50 PROD3 DRILL TRIP T Trip in well,BHA#27 with HYC bi 78.2 6,445.0 01:18 02:48 center with duraforce XD cutters, .9° AKO motor and RB agitator.Shallow test agitator-good 6/25/2017 6/25/2017 0.10 PROD3 DRILL DLOG T Log HRZ for-4'correction, 6,445.0 6,458.0 02:48 02:54 PUW=31.5K • 6/25/2017 6/25/2017 0.60 PROD3 DRILL TRIP T Continue in well,Clean trip through 6,458.0 8,214.0 02:54 03:30 window and to bottom 6/25/2017 6/25/2017 2.80 PROD3 DRILL DRLG P 8214',Drill, 1.8 BPM @ 4475 PSI FS, 8,214.0 8,400.0 03:30 06:18 BHP=3460,experience partial losses at-8300' 6/25/2017 6/25/2017 2.30 PROD3 DRILL DRLG P Experience total losses at-8400', 8,400.0 8,467.0 06:18 08:36 returns begin to come back to-.9 bpm relatively quickly,continue drilling ahead to heal losses,experienced almost total losses again at 8430', began to heal to 1 bpm returns,again went to total losses at 8462',close choke,annular down to 2897 psi 6/25/2017 6/25/2017 1.10 PROD3 DRILL DRLG P Difficulty getting to bottom past 8465', 8,467.0 8,467.0 08:36 09:42 multiple stalls,up to dp=1500 psi, multiple attempts&PU's to get started, PUW up to 60K Page 32/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) oz. , > Yml peg+ 1G-15 ConocoPhiulips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/25/2017 6/25/2017 1.00 PROD3 DRILL DRLG P OBD,CWT=1.4K,WOB=2.7K, 8,467.0 8,471.0 09:42 10:42 reduce rate to 1.6 bpm,drilling on total losses w/closed choke,Annular= 3040 psi,ROP at—1-2 fph,PUW=, 65K at 8470', passes thorugh 8463' continue to see increased FS, DD's thought is tight spot around BHA at 8463'(FS=925 psi below 8463',FS above 8463'=—725 psi) 6/25/2017 6/25/2017 1.90 PROD3 DRILL DRLG P OBD,pumping 1.6 bpm, CWT=- 8,471.0 8,480.0 10:42 12:36 7.5K,WOB=2.7K,total losses, Annular=3094 psi,PUW=49K at 8471.6', FS=750 psi above 8463', differential jumps to over 1900 psi when passing 8463',though still off bottom,low ROP observed, PUW= 65K from 8480' 6/25/2017 6/25/2017 2.00 PROD3 DRILL DRLG P Continue drilling through difficult 8,480.0 8,495.0 12:36 14:36 interval,WHP=135 psi,Annular= 3115 psi,PU's require multiple atttempts to pass restriction at 8463', confer with town,plan is to remain on closed choke,drilling on Duo-Vis systems. 6/25/2017 6/25/2017 1.90 PROD3 DRILL DRLG P Continue drilling,CWT=-8.5K,WOB 8,495.0 8,507.0 14:36 16:30 =2.3K,pumping 1.75 bpm,Annular= 3011 psi,WHP=30 psi,PU from 8495,PUW=62 K,continue to have extreme difficulty working past 8463'. RIH shows-8K CWT when bit is at 8480'and will"break"through resulting in 12K positive CWT,attempt mutlple TF's at min rate, 6/25/2017 6/25/2017 0.60 PROD3 DRILL DRLG P Unable to get by 8462',confer with 8,507.0 8,507.0 16:30 17:06 town,decision made to to attempt to ' get to bottom for 1.5 more hours,then begin to POOH. 6/25/2017 6/25/2017 3.20 PROD3 DRILL DRLG P 8507', Break out, 1.78 BPM @ 3659 8,507.0 8,780.0 17:06 20:18 PSI FS,BHP=3138,Choke closed 6/25/2017 6/25/2017 0.40 PROD3 DRILL WPRT P Pull Wiper to billet 7900',Slow down 5 8,780.0 7,900.0 20:18 20:42 FPM through 8490 to 8440 Small motor work bumps through this area, 8490&8470 6/25/2017 6/26/2017 3.30 PROD3 DRILL WPRT P 7900'RBIH Set down in 8458-8460 7,900.0 8,455.0 20:42 00:00 area.Work pipe at different speeds, toolfaces,and pump rates.Confer with town about possible redrill/sidetrack in this area.Proceed to drill our way through,Pumped beaded lube pill with little effect 6/26/2017 6/26/2017 0.30 PROD3 DRILL WPRT P Continue to work pipe 8,455.0 8,445.0 00:00 00:18 6/26/2017 6/26/2017 3.10 PROD3 DRILL WPRT P Unable to work pipe through,Go to 8,445.0 8,775.0 00:18 03:24 drilling mode, 1.76 BPM @3780 PSI FS,BHP=3290,Multiple stalls and pick ups,Drill 30 to 70 ROHS.Break through @ 8520,wipe to 8775 6/26/2017 6/26/2017 0.60 PROD3 DRILL WPRT P Pump 5 X 5 Sweeps,chase sweeps, 8,775.0 8,424.0 03:24 04:00 PUH through area,Overpull with ' motor work @ 8467 turn around able to RIH,come back up through Page 33/37 Report Printed: 7/3/2017 • • Operations Summary (with Timelog Depths) ►tel IG-15 Conoo3Phillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log i Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/26/2017 6/26/2017 0.30 PROD3 DRILL WPRT P RBIH,Set down @ 8456,Work pipe, 8,424.0 8,456.0 04:00 04:18 vary speeds and rates 6/26/2017 6/26/2017 2.20 PROD3 DRILL DRLG P Go back to drilling mode, 1.8 BPM @ 8,456.0 8,526.0 04:18 06:30 3780 PSI FS,BHP=3208,working pipe to get to bottom 6/26/2017 6/26/2017 0.50 PROD3 DRILL WPRT P Get through tight spot,back ream up- 8,526.0 8,440.0 06:30 07:00 hole. 6/26/2017 6/26/2017 0.90 PROD3 DRILL WPRT P Work pipe back through restriction, 8,440.0 8,780.0 07:00 07:54 confer with town,drill ahead 6/26/2017 6/26/2017 4.00 PROD3 DRILL DRLG P OBD,CWT=6K,WOB=1.5K,BHP 8,780.0 9,012.0 07:54 11:54 3267 psi,average ROP=58 fph 6/26/2017 6/26/2017 2.40 PROD3 DRILL DRLG P Continue drilling ahead,CWT=-1.5K, 9,012.0 9,092.0 11:54 14:18 WOB= 1.5K 6/26/2017 6/26/2017 0.20 PROD3 DRILL WPRT P Wiper up-hole, PUW=39K 9,092.0 8,552.0 14:18 14:30 6/26/2017 6/26/2017 0.30 PROD3 DRILL WPRT P Wiper in-hole,RIW=10K,sticky 8,552.0 9,092.0 14:30 14:48 working through 8948' 6/26/2017 6/26/2017 3.80 PROD3 DRILL DRLG P BOBD,CWT=-3K,WOB=1.2K, BHP 9,092.0 9,200.0 14:48 18:36 =3280 psi, ROP variable,5-200+ ROP 6/26/2017 6/26/2017 3.60 PROD3 DRILL DRLG P Continue drilling,CWT=.1K,WOB= 9,200.0 9,297.0 18:36 22:12 1K,Rate In=1.78 bpm,pumping pills, some PU's required. 6/26/2017 6/27/2017 1.80 PROD3 DRILL DRLG P Drilling ahead,CWT=-4K,WOB 9,267.0 9,328.0 22:12 00:00 =.2K, Rate In=1.8 bpm,BHP=3295 psi,WHP=182 psi,observe some vibrations,with low ROP 6/27/2017 6/27/2017 0.60 PROD3 DRILL DRLG P 9328',Drill, 1.7 BPM#3750 PSI FS, 9,328.0 9,347.0 00:00 00:36 BHP=3293 6/27/2017 6/27/2017 0.30 PROD3 DRILL WPRT P Stacking, Pull 100'wiper,PUW=44K 9,347.0 9,347.0 00:36 00:54 6/27/2017 6/27/2017 1.30 PROD3 DRILL DRLG P 9347',Drill, 1.70 BPM @ 3730 PSI 9,347.0 9,364.0 00:54 02:12 FS,BHP=3268 6/27/2017 6/27/2017 0.10 PROD3 DRILL WPRT P 100'Wiper,PUW=49K 9,364.0 9,364.0 02:12 02:18 6/27/2017 6/27/2017 1.00 PROD3 DRILL DRLG P 9364',Drill, 1.8 BPM @ 3730 PSI FS, 9,364.0 9,381.0 02:18 03:18 BHP=3313 6/27/2017 6/27/2017 0.30 PROD3 DRILL WPRT P Pull short wiper to 9364,Slight trouble 9,381.0 9,381.0 03:18 03:36 getting to run in hole 6/27/2017 6/27/2017 2.40 PROD3 DRILL DRLG P 9381',Drill, 1.77 BPM @ 3989 PSI 9,381.0 9,413.0 03:36 06:00 FS,BHP=3331,WHP=232 6/27/2017 6/27/2017 1.90 PROD3 DRILL WPRT P Pull heavy off bottom,65K,Can't get 9,413.0 9,413.0 06:00 07:54 back to bottom,wipe up to 8510,work back to botom 6/27/2017 6/27/2017 1.60 PROD3 DRILL DRLG P 9413,Trying to get drilling called TD, 9,413.0 9,412.0 07:54 09:30 PUH and circulate 10 X 10 sweeps down followed by liner running pill 6/27/2017 6/27/2017 1.70 PROD3 DRILL WPRT P PUH pumping beaded liner running 9,412.0 8,828.0 09:30 11:12 pill,Pull heavy and hang up—8424. Work pipe down,Pump down backside and RIH,Pull up through' tight area 6/27/2017 6/27/2017 0.80 PROD3 DRILL WPRT P 8228,Paint 8150'EOP flagg-yellow- 8,828.0 5,518.0 11:12 12:00 Continue up hole 6/27/2017 6/27/2017 0.60 PROD3 DRILL CIRC P 5518,In casing,bullhead 65 BBIs 5,518.0 5,518.0 12:00 12:36 mud down CT by Tubing annulas 6/27/2017 6/27/2017 0.30 PROD3 DRILL WPRT P Trip in hole 5,518.0 6,435.0 12:36 12:54 Page 34/37 Report Printed: 7/3/2017 • Operations Summary (with Timelog Depths) A i 10-15 • +Cono 'hi[Ilps Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/27/2017 6/27/2017 0.40 PROD3 ' DRILL DLOG P Log HRZ for tie in,+21.5'correction- 6,410.0 6,439.0 12:54 13:18 Check injector counter-Good 6/27/2017 6/27/2017 0.40 PROD3 DRILL WPRT P Continue in well 6,439.0 7,729.0 13:18 13:42 6/27/2017 6/27/2017 0.10 PROD3 DRILL OTHR T RIH @ 50 FPM reel tripped out, 7,729.0 7,729.0 13:42 13:48 Inspect injector,gooseneck,and CT, RIW=31 K before trip 6/27/2017 6/27/2017 0.20 PROD3 DRILL TRIP T PUH to cased hole 7,729.0 6,902.0 13:48 14:00 6/27/2017 6/27/2017 1.70 PROD3 DRILL RGRP T Trouble shoot PLC's,Reset PLC's, 6,902.0 6,902.0 14:00 15:42 Reload control program 6/27/2017 6/27/2017 0.30 PROD3 DRILL RGRP T PUH 500'to start testing control 6,902.0 6,902.0 15:42 16:00 program,Trip in hole brake and control as designed, 2 Hrs NAD NPT 6/27/2017 6/27/2017 2.00 PROD3 DRILL TRIP P Good testing, Resume ops,Trip in to 6,902.0 9,524.0 16:00 18:00 bottom 6/27/2017 6/27/2017 0.50 PROD3 DRILL CIRC P PUH,pump liner pill 9,524.0 9,524.0 18:00 18:30 6/27/2017 6/27/2017 0.50 PROD3 DRILL TRIP P POOH,laying in liner pill 9,524.0 8,400.0 18:30 19:00 6/27/2017 6/27/2017 0.15 PROD3 DRILL TRIP P Continue POOH,painting EOP TD 8,400.0 6,440.0 19:00 19:09 flag(Yellow)@ 8,278' 6/27/2017 6/27/2017 0.25 PROD3 DRILL DLOG P Log the HRZ,plus 3'ft. 6,440.0 6,458.0 19:09 19:24 6/27/2017 6/27/2017 1.00 PROD3 DRILL TRIP P Continue POOH,painting EOP 6,458,0 70.6 19:24 20:24 Window Flag(White)@ 5,878' 6/27/2017 6/27/2017 1.90 PROD3 DRILL DISP P Bullhead fliuds from surface,PJSM for 70.6 70.6 20:24 22:18 unstabbing INJH and LD tools,check well for flow,pump 5 bbls no returns 6/27/2017 6/27/2017 1.00 PROD3 DRILL PULD P Unstab INJH,LD tools,fill hole with 70.6 0.0 22:18 23:18 hole fill pump,(52 bbl loss rate) 6/27/2017 6/27/2017 0.50 COMPZ3 CASING PUTB P Prep rig floor for liner 0.0 0.0 23:18 23:48 6/27/2017 6/28/2017 0.20 COMPZ3 CASING SFTY P PJSM for PU liner 0.0 0.0 23:48 00:00 6/28/2017 6/28/2017 2.00 COMPZ3 CASING PUTB P PU/MU 28 jts of slotted liner,(52 bph 0.0 1,131.6 00:00 02:00 loss rate) """Kick while tripping drill 3 min 36 sec""" 6/28/2017 6/28/2017 0.50 COMPZ3 CASING PULD P MU GS,and BHI Coiltrak tools.(14 k 1,131.6 1,155.5 02:00 02:30 tw) 6/28/2017 6/28/2017 0.50 COMPZ3 CASING PULD P Move over,inspect pac-offs,inspect 1,155.5 1,155.5 02:30 03:00 UQ check valves,MU INJH to tools, close slips,strip down INJH onto • stump. 6/28/2017 6/28/2017 0.25 COMPZ3 CASING RUNL P Open slips,tag up,reset counters, 1,155.5 1,155.5 03:00 03:15 RIH w/AL2 lower liner segment 28 jts of slotted liner,with ported bullnose. 6/28/2017 6/28/2017 1.70 COMPZ3 CASING RUNL P RIH,with AL2 lower liner assembly 28 1,155.5 6,997.0 03:15 04:57 jts slotted liner,correct to the EOP flag minus 7.7'.Continue in hole. 6/28/2017 6/28/2017 1.80 COMPZ3 CASING RUNL P 6997,Initial setdown,Work pipe down, 6,997.0 8,201.0 04:57 06:45 RIH @ 8201 6/28/2017 6/28/2017 0.10 COMPZ3 CASING RUNL P Continue in well clean to 8464 8,201.0' 8,464.0 06:45 06:51 Page 35/37 Report Printed: 7/3/2017 • • • ,i, `= '". Operations Summary (with Timelog Depths) 1G-15 ConocoPhillips I Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/28/2017 6/28/2017 2.90 COMPZ3 CASING RUNL P Work pipe in attempt to pass 8464 8,464.0 8,464.0 06:51 09:45 while pumping 43 BBI beaded liner pill down back side 6/28/2017 6/28/2017 1.60 COMPZ3 CASING RUNL P Beaded pill around liner/BHA work 8,464.0 8,464.0 09:45 11:21 pipe 6/28/2017 6/28/2017 0.60 COMPZ3 CASING RUNL P Mix and pump 150 BBI beaded liner 8,464.0 8,464.0 11:21 11:57 pill 6/28/2017 6/28/2017 1.00 COMPZ3 CASING RUNL P Tubing&open hole full of beaded liner 8,464.0 8,464.0 11:57 12:57 lube pill-Work pipe down.Hold in compression pumping beaded pill past liner.Wary pump rates,Work pipe 6/28/2017 6/28/2017 0.30 COMPZ3 CASING RUNL P Pull up hole 150'RBIH to bottom- 8,464.0 8,464.0 12:57 13:15 work pipe,Hold in compression 6/28/2017 6/28/2017 1.70 COMPZ3 CASING RUNL T POOH with liner,Paint EOP flag @ 8,464.0 1,146.3 13:15 14:57 6200' 6/28/2017 6/28/2017 3.00 COMPZ3 CASING PULD T At surface,PJSM,lay down 12 joints 1,146.3 0.0 14:57 17:57 liner 6/28/2017 6/28/2017 0.50 COMPZ3 WHDBOP CTOP P MU nozzle,remove check valves, 0.0 0.0 17:57 18:27 stab onto well,jet stack 6/28/2017 6/28/2017 1.00 COMPZ3 WHDBOP CTOP P Grease crew here,service well head 0.0 0.0 18:27 19:27 and swab valves,grease stack and valves. 6/28/2017 6/28/2017 0.65 COMPZ3 WHDBOP CTOP P swap coil over to fresh water.PJSM 0.0 0.0 19:27 20:06 for BOP testing 6/28/2017 6/28/2017 2.41 COMPZ3 WHDBOP CTOP P Swab#2 leaking,call grease crew out 0.0 0.0 20:06 22:30 to service valve again.close SSV, good shell test. 6/28/2017 6/29/2017 1.49 COMPZ3 WHDBOP BOPE P Start bi-weekly test,test witnessed by 0.0 0.0 22:30 00:00 Matt Herrera,250 psi low/3,800 psi high 6/29/2017 6/29/2017 8.50 COMPZ3 WHDBOP BOPE P Continue bi-weekly test,test 0.0 0.0 00:00 08:30 witnessed by Matt Herrera,250 psi low/3,800 psi high/2,500 psi annular, 2 Hrs trouble time for Fail Pass on lower 2"BS,Cl,Replace R2 6/29/2017 6/29/2017 2.00 COMPZ3 CASING CTOP P Install checks in UQQ,Stab on well 0.0 0.0 08:30 10:30 and roll coil back to drilling fluid 6/29/2017 6/29/2017 1.70 COMPZ3 CASING PUTB P PJSM,M/U AL2 lower liner 0.0 688.1 10:30 12:12 segment,ported bullnose,16 JTS • slotted liner,shorty deployment sleeve.Make up to coil and surface test tools. 6/29/2017 6/29/2017 1.80 COMPZ3 CASING TRIP P RIH BHA#29 688.0 7,650.0 12:12 14:00 6/29/2017 6/29/2017 0.10 COMPZ3 CASING DLOG P Tie into RA marker for-6.3(-9.3 at 7,650.0 7,676.0 14:00 14:06 flag,+3 at RA)Hi lube 50 BBI pill with LVT down backside 6/29/2017 6/29/2017 1.50 COMPZ3 CASING TRIP P Continue in well,Clean trip,Tag up 7,676.0 8,462.0 14:06 15:36 and work pipe,Pill coming past BHA, work pipe,relax,work pipe 6/29/2017 6/29/2017 2.00 COMPZ3 CASING TRIP P Pump off liner,trip out of well,Paint 8,462.0 44.2 15:36 17:36 6500 and 5700'EOP flags 6/29/2017 6/29/2017 1.00 COMPZ3 CASING PULD P At surface,PJSM,LD setting tools and 44.2 0.0 17:36 18:36 BHI Coiltrak. 6/29/2017 6/29/2017 1.00 COMPZ3 CASING PUTB P Prep RF for liner,PJSM 0.0 0.0 18:36 19:36 6/29/2017 6/29/2017 2.25 COMPZ3 CASING PUTB P MU AL2 Upper Liner section. 0.0 1,214.6 19:36 21:51 Page 36/37 Report Printed: 7/3/2017 • 0 Operations Summary (with Timelog Depths) 1G-15 ConocoPhillips ril.xk. Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/29/2017 6/29/2017 0.50 COMPZ3 CASING PULD P PU/MU BHI CoilTrak tools,space out, 1,214.6 1,258.8 21:51 22:21 close rams,strip down INJH,MU union,surface test tools 6/29/2017 6/29/2017 1.25 COMPZ3 CASING RUNL P RIH,with AL2 upper liner segment 1,258.8 6,971.4 22:21 23:36 with PBR and Haliburton Swell Packer 6/29/2017 6/29/2017 0.25 COMPZ3 CASING RUNL P Correct to the EOP flag at 5,700', 6,971.4 6,971.4 23:36 23:51 correction of minus 12.54',PUW 33 k 6/29/2017 6/30/2017 0.15 COMPZ3 CASING RUNL 'P Continue IH 6,971.4 7,206.0 23:51 00:00 6/30/2017 6/30/2017 0.30 COMPZ3 CASING RUNL P Continue IH,tag TOL at 7825.7',PUW 7,206.0 7,825.7 00:00 00:18 33 6/30/2017 6/30/2017 0.20 COMPZ3 CASING RUNL P Bring pump up to 1.5 bpm at 3,732', 1 7,825.7 6,575.0 00:18 00:30 bpm returns, PUW 28 k,PUH 6/30/2017 6/30/2017 0.30 DEMOB WELLPR CTOP P 15 min,static survey,sensor depth 6,575.0 6,575.0 00:30 00:48 6,561',AP 3,108',MW 9.9 ppg,TVD 6,031' 6/30/2017 6/30/2017 2.10 DEMOB WELLPR DISP P Displace well to SW while POOH 6,575.0 2,500.0 00:48 02:54 6/30/2017 6/30/2017 0.10 DEMOB WELLPR FRZP P Pump 30 BBI freeze protect 2,500.0 2,500.0 02:54 03:00 6/30/2017 6/30/2017 0.60 DEMOB WELLPR TRIP P POOH laying in diesel freez protect 2,500.0 29.0 03:00 03:36 6/30/2017 6/30/2017 1.50 DEMOB WELLPR PULD P PJSM,PUD BHA#30 29.0 0.0 03:36 05:06 6/30/2017 6/30/2017 0.70 DEMOB WHDBOP CLEN P M/U nozzle,stab on well.Jet BOP- 0.0 0.0 05:06 05:48 flush surface lines 6/30/2017 6/30/2017 1.00 DEMOB WHDBOP CLEN P Unstab injector from well,Install test 0.0 0.0 05:48 06:48 joint and function rams while pumping through R valves 6/30/2017 6/30/2017 0.70 DEMOB WHDBOP OTHR P Run bore scope down through BOPE 0.0 0.0 06:48 07:30 to visually inspect rams 6/30/2017 6/30/2017 2.00 DEMOB WHDBOP WWSP P PJSM,Rig up lubricator and set BPV 0.0 0.0 07:30 09:30 6/30/2017 6/30/2017 4.50 DEMOB MOVE MOB Empty pits,Nipple down stack,work 0.0 09:30 14:00 R/D check list.RIG RELEASE 14:00 Page 37/37 Report Printed: 7/3/2017 1 0 ! 1G-15A CTD Schematic - 4-1/2"Camco DB nipple @ 496'MD(3.75"min ID) 16"62#14-40 shoe 4-1/2"12.6#L-80 EUE Ord Tubing to surface • ©114'MD • O- 4-1/2"Camco gas lift mandrels @ 2586',3823',4909',5617'MD ._ Baker Premier Packer @ 5671'MD(3.875"ID) 4-1/2"Camco DB nipple @ 5684'MD(3.75"min ID) 10-3/4"40#J-55 shoe 4-1/2"Camco gas lift mandrel @ 5727'MD @ 2202'MD -....o. Crossover 4.5"x 3.5"@ 6524'MD — ' Baker 80-40 PBR @ 6542'MD Baker FHL Packer @ 6558'MD Otis X-Nipple @ 659T MD(2.813"ID) Overshot @ 6630'MD O / ' Otistis SBR Packer@ 6644'6670'MD MD(2.813"ID,X-profile) I�" �I @ 3-1/2"Otis production mandrels @ 6708'and 6777'MD BLAST JOINTS across Perfs 3-1/2"Otis production mandrel @ 7045'MD / / Otis WD Packer @ 7086'MD(4.0"ID) C-sand perfs(sqz'd) / Otis Mill Out Ext.@ 7089'MD 6834'-6838'MD 6843'-6880'MD �• 3-1/2"Camco D landing nipple @ 7105'MD 6890'-6898'MD I ;;:I , 2.75"min ID 6954'-7007'MD _ CA-2 Plug Installed 10'of sand on plug -Cement spotted between GLMs. -^4 -Squeezed into C-sand perfs. ��I 1G-15AL1 (C3/C4 sand) -Milled out for whipstock. - TD©9625'MD 2-3/8"Slotted Liner,Bottom @ 9598' Aluminum Billet on OH Anchor @ 7835' Baker Monobom XL Whipstock Tray on OH r _..i_— —21 1G-1SA)Cl sand) Anchor @ 7017'MD 4 '1 TD @ 9863'MD c.... _ 2-3/8"Slotted Liner Baker Monobore XL • ; ®— .. _ Whipstock Tray on OH ,h 1 Y".'.. C Aluminum Billet on Anchor @ 7860' nchor @ 7033'MD ,. i Bottom of Liner @ 9545' A-sand ens(plugged) _. - '�., •e-�„�C ,�<._ -. FISH 7193'-7230'MD '" "�" C 4•� �. Lower Half Weatherford Motor t..,."'••_" " 4 LL"—`""" and Rotor @ 9564' VE 1G-15AL2(Clsand) TD @ 9424'MD _ 1G-15APB1(Cl sand Plug Back) 2-3/8"Slotted Liner,Bottom @ 8462' TD @ 9150'MD 2-3/8"Solid Liner,Bottom @ 7786' 7"26#J-55 4. Faulted Out of Zone Halliburton Swell Packer @ 7056' shoe @ 7502'MD i'IHole Collapse in Build Seal Bore Deployment Sleeve @ 6612' E>> rr' KUP OD • 1G-15 ConocoPhillipsWell Attrib Max Angle&MD TD Alaska,Irk: , Wellbore API/UWI Field Name Wellbore Status ncl(') MD(ftKB) Act Btm(ftKB) tonoccOtkIlps'' 500292102400 KUPARUK RIVER UNIT PROD 38.12 5,325.00 7,533.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) -Rig Release Date 10-15,7/31/20179:37:52 AM SSSV:NIPPLE 450 7/31/2015 Last WO: X7/7/2004 41.00 10/29/1983 Ventral sr nn,obc..(ec5al) - 'Annotation Depth(ftKB) End Date Annotation Last Mod By End Date HANGER;31.3 -,.I Last Tag:SLM 7,166.0 10/25/2014 Rev Reason.SIDETRACK,SET PACKER jennalt 7/19/2017 ME Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(1...Grade Top Thread 11! J11 CONDUCTOR 16 15.060 36.0 114.0 1140 6300 H-40 WELDED I!9!I ,may Casing Description OD(n) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I_Grade Top Thread ��:. _I SURFACE 103/4 9.950 36.5 2,202.3 2,202.1 40.00 J-55 BTC n Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I.. Grade Top Thread CONDUCTOR;36.0-114.0 r lk PRODUCTION 7 6.276 34.2 7,502.2 6,934.4 26.00 J-55 BTC NIPPLE;498.5 r Tubing Strings Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(lb/ft) Grade Top Connection TUBING 1 4 1/21 3.9581 31.31 6,543.91 6,113.71 12.601 L-80 I IBT-MOD Completion Details Nominal ID 1� Top(SOB) Top(ND)(SOB) Top Incl(') Item Des Corn (in) SURFACE;36.5-2,202.3 .- ` 31.3 31.3 0.00 HANGER MCEVOY TUBING HANGER 3.958 496.5 496.5 0.58 NIPPLE CAMCO DB-8 LANDING NIPPLE 3.813 GAS LIFT,2,565.9 5,671.2 5,384.0 35.56 PACKER BAKER PREMIER PACKER 3.875 5,683.8 5,394.3 35.56 NIPPLE CAMCO DB NIPPLE 3.750 6,523.5 6,096.2 30.68 XO Reducing CROSSSOVER 4.5 x 3.5 3.500 GAS LIFT;3,822.8 I 6 5323 6,1037 30.61 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 3000 escriptionString Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(Ib/ft) Grade Top Connection 1998 1 31/21 2.9921 6,542.0 6,637.31 6,194.21 9.301 L-80 1 EUE8RMOD GAS LIFT,4,906.7 Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl CI Item Des Com (In) GAS LIFT;5,61.5 6,542.0 6,112.1' 30.51 PBR BAKER 80-40 PBR 2.813 6,558.4 6,126.2 30.39 PACKER BAKER FHL RETRIEVABLE PACKER 2.969 I 6,597.1 6,159.6 30.55 NIPPLE OTIS X LANDING NIPPLE SELECTIVE PROFILE(SET 2.813 PACKER;5,671.2 8/10/99) 111 m'.,� 6,630.1 6,188.0 30.61 OVERSHOT OVERSHOT,NO SEALS,MAX OD 5.99"SET 8/10/1998 2.930 NIPPLE;5,683.8 Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(TVD)(...Wt(I5/ft) Grade Top Connection GAS LIFT;5,728.8 TUBING 1984 41/2 2.867 6,630.0 7,115 71 6,603.31 9.301J -55 [Top Completion Details lir Top(ftKB) Top(ND)(ftKB) Top Incl r) Item Des Corn Nominal ID (in) IF 6,643.8- 6,199.8 30.56 SBR OTIS SBR 2/2.813 X-PROFILE SET 8/10/1998 2.813 SEAL ASSY;6s32.3 6,669.9 6,222.3 30.64 PACKER OTIS RRH PACKER 2.970 6,815.8 6,347.9 30.67 BLAST CARBIDE BLAST RINGS(3) 2.867 PBR;6,542.0 RINGS PACKER;6,558.4 _ 6,928.0 6,443.9 31.65 BLAST CARBIDE BLAST RINGS(3) 2.867 NIPPLE;6597.1 :a. RINGS 7,084.0 6,576.3 31.75 LOCATOR OTIS LOCATOR 3.000 '!it%..y 7,085.5 6,577.6 31.74 PACKER OTIS WD PACKER 4.000 Packer;6,611.0 a 7,089.2 6,580.7 31.73 MILL EXT OTIS MILL OUT EXTENSION 4.410 OVERSHOT;6,630.1, �.' 7,105.2 6,594.4 31.65 NIPPLE CAMCO D NIPPLE NO GO 2.750 TUBING;6,830.0 7,114.9 6,602.5 31.59 WLEG OTIS WIRELINE RE-ENTRY GUIDE,ELMD TTL @ 7111 3.000 SBR;6,843.8 �. ' during PPROF On 3/9/2006 PACKER;6,669.9 S.__p-! Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) PRODUCTION;6,707.5 Top(ND) Top Incl Top(ftKB) (ftKB) m CI Des CoRun Date ID(in) PRODUCTION;6,777.1 , 6,611.0 6,171.6 30.60 Packer BAKER 35 KB LINER TOP PACKER("2500 MAX 7/3/2017 1.870 PSIMAX")O.D./(9CR3)"W/G/-2F-N3 /8)," -FN 2-3/8"),STINGER(12'OAL/2.77" t f NjL+ 7,018.0 6,520.2 32.04 WHIPSTOCK WS#2 6/8/2017 0.000 • (PERF;6,834.0-6838.0 ♦ 4 -THRU TBG (PERF,6,843.0-6,880.0- 7,032.0 6,532.1 31.98 WHIPSTOCK WS#1 6/1/2017 0.000 -THRU TBG (PERF;6,890.0-6,895.0.- 10 7,095.2 6,585.8 31.70 SAND DUMP BAILED 10'OF SAND ON PLUG 10/25/2014 0.000 1 ii 4 0 timi 0 7,105.2 6,594.3 31.65 PLUG 2.75"CA-2 PLUG 10/25/2014 0.000 Cent Squeeze,6,800.0 ftKB .jam. 1 em7,510.0 I 6,941.1 30.92 FISH DROPPED 1"HFCV,BEK LATCH TO BOTTOM 1/14/2009 0.000 (PERF;6954.0-7,007.0 I i Perforations&Slots "AL2"Lateral Liner,6611.5- I 49 i Shot 8,462.0 Dens WHIPSTOCK-THRU TBG; RIM It Top(ND) Btm(ND) (hots/ 7,018.0 II` Top(ftKB) Btm(MB) (ftKB) (ftKB) Zone Date ft) Type Com WHIPSTOCK-THRU TOG; lit 6,834.0 6,838.0 6,363.5 6,367.0 C-4,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA 9 7.032.0 '„i/;t 6,843.0 6,880.0 6,371.3 6,402.9 C-4,1G-15 1/31/1984 12.0 (PERF 120 deg Phasing;5"DA PRODUCTION;7,045.4 At lif 06,890.0 6,895.0 6,411.5 6,415.7 C-3,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA �� 0 6,954.0 7,007.0 6,466.0 6,510.9 C-1,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA LOCATOR;7,084.0 .SIN� 'A�A 7,193.0 7,230.0 6,669.3 6,701.0 A-5,A-4,A-3, 5/23/1984 8.0 APERF 90 deg Phasing;2 1/16" 4` 1G-15 RigidJet PACKER;7,085.5 'R 4, MILL EXT;7,069.2 . Cement Squeezes � Top(ND) Btm(ND) - SAND;7,095.2. Top(000) Btm(ftKB) (ftKB) (ftKB) Des Start Date Corn NIPPLE;7,105.3, r 6.800.0 7,095.0 6,334.3 6,585.6 Cement 5/8/2017 BATCHED UP 30 BBLS CEMENT,15 BBLS WITH PLUG;7,105.2 +/////: Squeeze CEMNET FIBER,PARKED AT 7080'PUMPED .ya///i CEMENT WLEG;7,114.9 R'j Mandrel Inserts APERF;7,t93.0-7,230.0 at I ah N Top(ND) Valve Latch Port Size TRO Run Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Corn 1 2,585.9 2,585.7 CAMCO KBG-2 1 GAS LIFT GLV BK 0.188 1,260.0 5/3/2008 2 3,822.8 3,821.6 CAMCO KBG-2 1 GAS LIFT OV BK 0.250 0.0 5/3/2008 - 3 4,908.7 4,777.2 CAMCO KBG-2 1 GAS LIFT DMY BK-3 0.000 0.0 7/7/2004 PRODUCTION;34.2-7,502.2-. 4- 5.617.5- 5,340.3 CAMCO KBG-2 1 GAS LIFT DMY BK 0.000' 0.0 7/13/2004 FISH;7,510 0--t KUP .013 • 1G-15 Conoc 'hillips ,Alaska.h c,. ConOCOPhillips ...•• 1 G-15,7/31/2017 9'.37'.53 AM Veriwal schematic Picket/ HANGER;31.3 lan.re nse s � 1p at , SWI i[iJ N Top(TVD) Valve Latch Port Size TRO Run I. Top(ftKB) (RKB) Make Model OD(in) Seri, Type Type (in) (psi) Run Date Com ' pli 1 GAS DMY 0.000 0.0 4 CONDUCTOR;36.0-114.0 1 _I � 6 6,707.5 6,254.6 OTIS SPM 2 1 PROD DMY DMY BK BK-3 0.000 0.0 5/2/2017 NIPPLE;496.5 �_ _.- 7 6,777.1 6,314.6 OTIS SPM 1 PROD OPEN 5/2/2017 8 7,045.4 6,543.5 OTIS SPM 1 PROD HFCV BRK 0.000 0.0 3/24/2014 Notes:General&Safety End Date Annotation 3/10/1998 NOTE:Ran KINLEY Caliper Log from 6444'RKB to Surface on 3/10/98 SURFACE;36.5-2,2023 1 11/8/1998 NOTE:ORIGINAL COMPLETION BELOW 6630' 7/7/2004 NOTE:EXISTING COMPLETION PLUS ORIGINAL COMPLETION,BELOW 6542' GAS LIFT,2,585.9 LL.;:: 7/7/2004 NOTE:TREE: McEVOY/GEN 1 RETROFITTED TO CAMERON GEN 4 IM 9/21/2010 NOTE:Mandrels @ 6707-7045-MACCO SLOTTED DPHF ,111 9/21/2010 NOTE:View Schematic w/Alaska Schematic9.0 GAS LIFT;3,822.8 1103/24/2014 NOTE:BROKEN LATCH AT 7045'RKB GAS LIFT;4,908.7 mill GAS LIFT;5,617.5 I.' PACKER,5,671.2 NIPPLE;5,683.8 #"" IMIN iii GAS LIFT;5,726.6 lir IS IPSEAL ASSY;8,532.3 PBR;6,542.0 = PACKER;6,558.4 __ NIPPLE;6,597.1 IP/- Pecker;6,611.0 , OVERSHOT;6,630.1- .e TUBING,6,630.0 11 SBR;6,643.8 1: :.1 • PACKER;6,6&9.9 • PRODUCTION;6,707.5 a_ - PRODUCTION;6,777.1 ' E � R M I (PERF;6,834.0-6,838.0— t ' R: A (PERF;6,843.0-6,880.0— t t i (PERF,6,890 OS,895.0— a It w e Cement Squeeze;6,800.0 RKB 1 . (PERF;8,954.0. W —� ,1y 7,O .0 NNi 0{ 'AL.?Lateral Liner,6,611.5- h r 8,4820 0 WHIPSTOCK-THRU TBG; RSI 7,018.0 1:I WHIPSTOCK-THRU TBG, @ki $$ 7,032.0 1— PRODUCTION;7,045.4 ....„,,,ir NI 1N LOCATOR;7,084.0 Om PACKER;7,085.5 V ®.,L MILL EXT;7,089.2 yp '{ SAND;7,095.2 NIPPLE;7,105.3 PLUG;7,105.2 l� WLEG;7,114.9 ■ APERF;7,193.0-7,230.0- PRODUCTION;34.2-7,502.2—. FISH;7,510.0 UP PROD S 1G-15A ConocoPhillips . 1 ell Attributes Max Angle&MD TD Alaska inc. Wellbore API/UWI Field Name Wellbore Status Incl(°) MD(ftKB) Act Btm(ftKB) conocaulilps 500292102401 KUPARUK RIVER UNIT PROD 103.26 7,305.64 9,863.0 Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1G-15A,7/31/20179:38:59 AM SSSV:NIPPLE 450 7/31/2015 Last WO: 41.00 10/29/1983 Vertical.schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date HANGER;31.a yty;;: Last Tag: Rev Reason:SIDETRACK,SET PACKER jennalt 7/19/2017 ] Casing r CasingDescripStringstion OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread kg "A"Lateral Liner 2 3/8 1.992 7,860.0 9,545.0 6,459.0 4.70 L-80 ST L WIIIIIIIIIII1111111.111111111/11111111/1111111.110111tithillil All, i) ' F. Liner Details alkNominal ID ,, - ,-..., Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Corn (in) CONDUCTOR;36.0-114.0 4 7,860.0 6,448.4 94.31 ALUMINUM OH Anchor&Aluminum Billet 1.920 NIPPLE;496.5 BILLET 7,879.9 6,447.2 92.92 SHORTY Shorty Deployment Sleeve • DEPLOYMENT SLEEVE Other In Hole(Wireline retrievable plugs,valves, pumps,fish,etc.) SURFACE;36.5-2,202.3 Top(ND) Top Incl Top(ftKB) (ftKB) (°) Des Corn Run Date ID(in) 7,055.0 6,549.7 43.27 Barrier- HES Swell packer 6/29/2017 1.683 GAS LIFT;2,585.9 Packer 9,564.0 6,461.5 82.48 FISH Weatherford rmotor parted at AKO junction,Left 2,2' 6/14/2017 0.000 of motor tip,.65'Bi center bit GAS LIFT;3,822.8 - Notes: General&Safety End Date Annotation NOTE: GAS LIFT;4,908.7 1. GAS LIFT;5,617.5 PACKER,5,671.2M NIPPLE,5,683.8 `AIM ` :' GAS LIFT,5,726.6 II k 1 SEAL ASSY,6,532.3 PBR,6,542.0 a PACKER,6,558.4 NIPPLE;6,597.1 ;:411111.. Packer;6,611.0 iAUK;-t OVERSHOT;6,630.11 P_ ..TUBING;6,630.0 SBR,6,643.8 Ilicw PACKER;6,669.9 PRODUCTION;6,707.5 Pr_, �—� PRODUCTION;6,777.1 'R, d (PERF;6,834.0-6,838.0 % .' (PERF;6,843.0-6,880.0 • Y (PERF;6,890.0-6,895.0 R Cement Squeeze;6,800.0 ftKB % 111111 A. (PERF;6,954.0-7,007.0 p PRODUCTION;34.2-7,502.2 /. —. KUP OD 0 1G-15AL1 Con©coPhillips 0. Well Attrib Max Angle&MD TD Al aki3 inc., Wellbore API/UWI Field Name Wellbore Status ncl(°) MD(ftKB) Act Btm(ftKB( CdriOCTAIlitipa 500292102460 KUPARUK RIVER UNIT PROD 103.76 8,150.46 9,625.0 -.- Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1G-15AL1,7/31/20179.39.34 AM 450 7/31/2015 Last WO: 41.00 10/29/1983 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date HANGER,31.3 -gi n:;- Last Tag: Rev Reason:SIDETRACK,SET PACKER jennalt 7/19/2017 Casing Strings ' Casing Description OD(in) 10(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread i Ili II "AL1 Lateral Liner 2 3/8 1.992 7,835.0 9.603.2 6,369.2 4.70 L-80 ST L 111 l I , .., Liner Details Nominal ID Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) CONDUCTOR;36.0-114.0 '�' 7,835.0 6,451.0 97.44 ALUMINUM OH Anchor 8 Aluminum Billet 1.920 1. 41i BILLET NIPPLE;496.5 _ :. 7,856.7 6,448.7 94.74 SHORTY Shorty Deployment Sleeve DEPLOYMENT • SLEEVE JJJjjj Notes:General&Safety End Date Annotation j, NOTE: SURFACE;36.5-2,202.3 GAS LIFT;2,585.9 GAS LIFT;3,822.6 GAS LIFT,4,908.7 alllll I GAS LIFT;5,617.5 11.1 NM PACKER,5,671.2 MIN NIPPLE,5,683.8 GAS LIFT;5,726.6 $AIR ® V i SEAL ASSY;6,532.3 PBR;6,5420 WM PACKER;6,558.4 -- NIPPLE;6,597.1 ., 0 J14.. Packer;6,611,0 am OVERSHOT;6,630.1` . TUBING;6,630.0 I.■' SBR;6,643.8 I: PACKER;6,689.9 _ PRODUCTION;6,707.5 I." 1 al PRODUCTION;6,777.1 l IPERF;6,834.0-0,030.D-. IPERF;6,643.06,8800 7 IPERF;6,890.06,885.0 Cement Squeeze,6,800.0 ftKB Si MT IPERF;6,954.0-7,007.0-, y i PRODUCTION;34.2-7,502.2 � $ � Berner-Packer;7,055.0 "AL2'Lateral Liner;6,6115- 8,482.0 i 1 i i "AL1"Lateral Liner,7,635.0- 9,603 2-.. -9,6032 • KUP MOD . 1G-15AL2 Conoct> tllli s Well Attrib311, Max Angle&MD TD ,Alaska,Int, Wellbore API/UWI Field Name Wellbore Status ncl Ii MD(ftKB) Act Btm(ftKB) Conocowhdhp, 500292102461 KUPARUK RIVER UNIT PROD 103.26 7,305.64 9,424.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1G-15A1_2,7/31/20179:4011 AM _ 450 7/31/2015 Last WO: 41.00 10/29/1983 Verpcal schematc(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date HANGER;31 3 Last Tag: Rev Reason:SIDETRACK,SET PACKER jennalt 7/19/2017 Casing Strings �I. Casing Description OD(in) ID(in) Top(MED Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread 1 'r J 'AL2 Lateral Liner 2 3/8 1.992 6,611.5 8,462.0 6,424.2 4,70 L-80 ST-L „44 fi Liner Details �I Top(ftKB) Top(TVD)(ftKB) Top Incl(') Item Des Corn Nominal ID (in) 1Ella� 6,611.5 6,172.0 30.60 SBR Deployment Sleeve w/6'Sealbore Receptical(PBR) 1.000 CONDUCTOR..,....„,..„-...r.„,,,..„,0-114.0 NIPPLE;496.5 7,055.7 6,550.2 43.58 SWELL Swell Packer-Halliburton 1.686 PACKER 7,826.1 6,452.2 97.69 DEPLOYMENT Shorty Deployment Sleeve 1.992 SLEEVE p Notes:General&Safety End Date Annotation SURFACE;36.5-2,202.3 L NOTE: GAS LIFT,2,585.9 IN IN GAS LIFT:3,822.8 GAS LIFT;4,908.7 AN GAS LIFT;5,617.5 Illi PACKER;5,671.2 . ` NIPPLE,5,683.8 st its GAS LIFT;5,726.6 tWi f J SEAL ASSY,6,532 3 PBR;6,5420 = PACKER;6,558.4 ill NIPPLE;6,597.1 Packer;6,611.0 OVERSHOT;6,6301 TUBING,6,630.0 SBR;6,643.8 PACKER;6,669.9 PRODUCTION,6,707.5 0 PRODUCTION;6,777.1 ♦ 1 IPERF;6,834.0-8,8380 K IPERF;6,843.0-6,880.0---. N IPERF;6,890.06,895.0--. N +i Cement Squeeze;6,800.0 ftKB !1 —IS - # 6 IPERF;6,954.0.7,007.0 it PRODUCTION;34.2-7,502.2.---. "II i Barrier-Packer:7,055.0 Ma ill "ALT Lateral Leer,6,611 5' 8,462 0 ‘-st- Avc ! Z5§1.4� WELL LOG TRANSMITTAL DATA LOGGED PROACTIVE DIACINOSTIC SERVICES, INC. 6 /21/2011 M.K.BENDER To: AOGCC RECEIVED Makana Bender 333 West 7th Avenue Suite 100 JUN 13 2017 Anchorage, Alaska 99501 (907) 793-1225 AOGCC RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 SCANNEDJUN 2 201:7; 1) Caliper Report 25-May-17 1G-15 1 Report /CD 50-029-21024-00 2) Caliper Report 26-May-17 2M-22 1 Report /CD 50-103-20170-00 Signed : /'22a1I1 ,5 t?5.1 �ti! Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGEOMEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateF ilex\Templ ates\Distribution\Transmittal Sheets\ConocoPhill ip s_Transmit.docx • • 2-52-15 Memory Multi-Finger Caliper ,, INF�_ Log Results Summary Company: ConocoPhillips Alaska, Inc. Well: 1G-15 Log Date: May 25, 2017 Field: Kuparuk Log No.: 14824 State: Alaska Run No.: 1 API No. 50-029-21024-00 Pipe Description: 4.5 inch 12.6 lb. L-80 IBT-MOD Top Log Interval: Surface Pipe Use: Tubing Bottom Log Interval: 6,518 Ft. (MD) Pipe Description: 3.5 inch 9.3 lb. L-80 EUE 8RD MOD Top Log Interval: 6,518 Ft. (MD) Pipe Use: Tubing Bottom Log Interval: 7,050 Ft. (MD) Inspection Type : Restriction Inspection COMMENTS : This caliper data is tied into the top of GLM 7 at 6,777 feet(Driller's Depth). This log was run to assess the condition of the tubing with respect to internal corrosive and mechanical damage and I.D. restrictions. The caliper recordings indicate the 4.5 inch tubing appears to be in good condition, with no significant wall penetrations, areas of cross-sectional wall loss or I.D. restrictions recorded. The caliper recordings indicate the 3.5 inch tubing logged appears to be in good condition with respect to internal corrosive and mechanical damage, with no significant wall penetrations or areas of cross-sectional wall loss recorded. Deposits are recorded intermittently from —6,848 feet to—6,900 feet and across GLM 8, restricting the I.D. to 2.68 inches at 7,050 feet. No other significant I.D. restrictions are recorded throughout the tubing logged. A 3-D log plot of the caliper recordings across the tubing logged as well as a graph illustrating minimum recorded diameters on a joint-by-joint basis are included in this report. 4.5 INCH TUBING - MAXIMUM RECORDED WALL PENETRATIONS : No significant wall penetrations (> 15%) are recorded. 4.5 INCH TUBING - MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS : No significant areas of cross-sectional wall loss (>4%) are recorded. 4.5 INCH TUBING - MAXIMUM RECORDED ID RESTRICTIONS : No significant I.D. restrictions are recorded. 3.5 INCH TUBING - MAXIMUM RECORDED WALL PENETRATIONS : No significant wall penetrations (> 17%) are recorded throughout the tubing logged. 3.5 INCH TUBING - MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS : No significant areas of cross-sectional wall loss (> 11%) are recorded throughout the tubing logged. ProActive Diagnostic Services, Inc. / P.O. Box 1369, Stafford, TX 77497 Phone: (281) 431-7100 or (888) 565-9085 Fax: (281) 431-7125 E-mail: PDSAnalysis@memorylog.com Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314 • • 3.5 INCH TUBING - MAXIMUM RECORDED ID RESTRICTIONS : Deposits Inside GLM 8 2.68 inches 14.1 7,050 Ft. (MD) Deposits 2.68 inches 9 6,880 Ft. (MD) Deposits 2.71 inches 8 6,871 Ft. (MD) No other significant I.D. restrictions are recorded throughout the tubing logged. T. Leckband C. Waldrop S. Ferguson Field Engineer(s) Analyst(s) Witness(es) ProActive Diagnostic Services, Inc. / P.O. Box 1369, Stafford, TX 77497 Phone: (281) 431-7100 or (888) 565-9085 Fax: (281) 431-7125 E-mail: PDSAnalysis@memorylog.com Prudhoe Bay Field Office Phone: (907) 659-2307 Fax: (907) 659-2314 • • am, �<, PDS Multifinger Caliper 3D Log Plot Company : ConocoPhillips Alaska, Inc. Field : Kuparuk Well : 1G-15 Date : May 25, 2017 Description : Detail of Caliper Recordings Across 3.5 Inch Tubing Logged. Comments Depth Nominal I.D. 3-D Log Image Map 1:120 2 5 inches 3.5 0° 0° 90° 180° 270° 0° Maximum I.D. 2.5 inches 3.5 Minimum I.D. I I 2.5 inches 3.5 VA"? - 4.5"Tubing 6510 4.5"x 3.5" 'MIIIIIIIIIIIMI \__Cross-Over 7-7- 6520 ,IllIl _ 4-- Pup Joint .44113 6530' Baker Seal - Assembly illi —r I IT Baker 80-40 PBR 6540 111410MIM :T.., Baker FHL - Retrievable Packer '. rs 6550 ' /M 6560 Joint 1 I • • . - t - iliPINW ,/1111.Mr-.. 6570 1 ... . ••,-* ....„ .,...„- • _.. i 6580 Otis X Landing Nipple --.... i..._ +.- 6590 1 __--- .., -.,... --, .--- 77: ' - ..., Joint 2 6600 I .... 6610 f ..„ ,... Overshot 6620 .•• ff i ,= 6630 if _-- ....: II ...... ..„...... Seal Assembly 7."-- /1 a- .- 6640 5 • .•• . . AI- --- -' ....0.6.. --• -- .--. _ ---- , - - ... 6650 .•• ....,..-.-.-- .-i--t* ....r. 1 • • SBR ----•', , 6660 - 6670 Otis RRH Packer • • ;;.-• 6680 -= -..- -....-- , _a ; 6690 .„ ...,.-.... Joint 3 g., It- Amu- ,-, ...- ..", - 1.A.- 6700 7-....- ..i . c GLM 6(Latch @ 6710 _ : 3:00) - • • _ , •4•• . r.. 6720 •i&' Is r _ -ilt- V , I Joint 4 6730 ..--,...- -- ; ;.-.. .1 6740 0 L.-- ,..-.= -, ..'t.. .- • • • : ....,--.. -----1 -_... 6750 _7- -' t 1: ' -- - 1 6760 — Joint 5 I , ..-.--, .-- :-...-:----..- 7:,-- 6770 111 1 Blq.- I .....= z.= t .0. -ir MANOMMIL II GLM 7(Latch 6780 . 1 Position - • — I --- •AO' Unknown) ---_-_- :: ...-- 1 -,--__ :i1-- 6790 1 ...-_- I ..z..,„ I -,---- . .- 1 ..... z,,.... Joint 6 6800 6810 a ,..,..... ...,,.., Ateir __ -. ... --ii 6820 1 -- 1 , -:- r-. ...t:.; airF ..* Joint 7 6830 1 I / - - 1 0 • 6840■■■■1 ;■■■■■ • - ■■■UII■■■■■ ■■■■61111■■■■ ■■■ui111111■■■■ .f.- 68501111111111 Joint 8 ■■■ ■Iu■■■■ ;, Deposits IIN1IUHI Min.ID=2.71 in. 6860 11■� ■■■■ ■ «y ap 6870 11111411111 V IC ■■■■i#t■■■■ ■■u■rn■■■■■ : 6880■ i■111 ■■■■ 3 Joint 9 111111111111111 ' Deposits 11111111111111•111111111111111M -- 4=7 Min.ID=2.68 in. 6890, ■ ■■,�� ► =Toi,-, ■■[i.■■■■■■ r",, III ..._ minwason 6900■■■■ns■■■■ 11111 IIUI 1. ■■■■i ■■■■■ .s- ■■■CH�■■■■ 1.* Joint 10 6910■ li . ,_ i„... ■■■■ii.■■■■■ it.' 6920■■■■ii■■■■■ ■■■■E#■■■■■ • • ar 1.111111110E11.11116930■■■■item ■■ ■■■■iii■■■■ 2. ■■■■O i■■■■ 6940 Joint 11 1111111111111111 ■■■■ii■■■■■ , ■■■■IIii■■■■ ■■■■ 696°111111111111112111111111111111111 ■■■■NIM■■■■ ■■■■iiu■■■■ g 11111111111 6960■■■■111■1111■ it ■■■■111■■■■ IlIllillIll ,._ Joint 12 697011111111111111111111111111111 ■■■■ii••■■■■ 11111111111 6980 IllIlillIR 6990 11111111111 Joint 13E — 7000 i 7010■■■■ito■■■■ _- ■■■■E■■■■■ 0 le 7020 ': Joint 14 7030 J 7040 GLM 8 j Min.ID=2.68 in. Minimum I.D. I I 2.5 inches 3.5 Maximum I.D. I I 2.5 inches 3.5 Comments Depth Nominal I.D. 3-D Log Image Map 1 1:120 2.5 inches 3.5 0° 0° 90° 180° 270° 0° 0 • Correlation of Recorded Damage to Borehole Profile IPipe 1 4.5 in (8.9'-6,51 7.8') Well: 1 G-15 Pipe 2 3.5 in (6,517.8'- 7,049.8') Field: Kuparuk Company: ConocoPhillips Alaska,Inc. Country: USA Survey Date: May 25, 201 7 ■ Approx.Tool Deviation ■ Approx. Borehole Profile 1 13 —11 25 9 790 3 50 1,566 I a 75 7 2,345 GLM1 4 100 3,153 J �i E GLM 2 L --- - " 125 i4 3,956 o 0 150 -i 4,736 GLM 3 GLM 4 —� 5,538 GLM 5 2006,393 -7--: Pll Ilikh 1 6,550 EEO 9 _ GLM 8 , 14.1 7,044 0 50 100 Damage Profile(%wall)/Tool Deviation (degrees) Bottom of Survey=1 4.1 • PDS Report Overview � ► Body Region Analysis Well: 1 G-15 Survey Date: May 25,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 inches Country: USA No. of Fingers: 24 Pipe 4.5 in. 12.6 ppf L-80 IBT-MOD Analyst: C.Waldrop Pipe Nom.OD Weight Grade&Thread Nom.ID Top Depth Bottom Depth 4.5 in. 12.6 ppf L-80 IBT-MOD 3.958 in. 9 ft. 6,518 ft. Penetration(%wall) Damage Profile(%wall) 250 son Penetration body Metal loss body 0 50 100 0.1 200 150 100 50 45 0 0 • 1 0 to 20 to 40 to over 20% 40% 85% 85% Number of joints analyzed(total=220) GLM 1 220 0 0 0 92 - Damage Configuration(body) 10 GLM 2 (1:00) 8 139 6 GLM 3 (9:00) 4 2 GLM 4(6:00) 0 GLM 5 (7:00) Isolated General Line Other Hole/ Pitting Corrosion Corrosion Damage Pos.Hole Number of joints damaged(total=3) 2 0 1 0 0 Bottom of Survey=203.1 Ca PDS Report Joint Tabulation Sheet Well: 1G-15 Survey Date: May 25, 2017 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 4.5 in. 12.6 ppf L-80 IBT-MOD Tubing 3.958 in. 0.271 in. 9 ft. 6,518 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 0.1 9 0 0.03 10 3 3.92 Pup J 1 13 0 0.03 11 2 3.92 1.1 46 0 0.02 8 1 3.93 Pup 1.2 57 0 0.02 6 1 3.92 Pup 1.3 59 0 0.02 8 2 3.92 Pup 1.4 65 0 0.02 8 1 3.92 Pup 2 74 0 0.02 8 3 3.92 3 106 0 0.02 8 2 3.93 4 137 0 0.03 10 2 3.94 5 168 0 0.02 9 2 3.93 6 200 0 0.03 10 3 3.92 7 230 0 0.02 8 2 3.93 8 261 0 0.02 9 3 3.93 9 292 0 0.02 9 3 3.94 10 323 0 0.02 8 2 3.92 11 355 0 0.03 10 3 3.92 12 385 0 0.02 8 2 3.93 13 417 0 0.02 8 2 3.93 14 448 0 0.03 10 2 3.92 14.1 479 0 0 0 0 3.78 CAMCO DB-8 LANDING NIPPLE 15 481 0 0.02 7 3 3.93 16 512 0 0.02 8 2 3.90 17 543 0 0.03 10 3 3.91 18 575 0 0.02 7 2 3.92 19 606 0 0.03 10 3 3.92 20 636 0 0.02 8 3 3.90 Lt. Deposits. 21 665 0 0.02 8 1 3.93 3 22 696 0 0.03 9 3 3.93 23 727 0 0.02 8 1 3.93 24 759 0 0.03 9 2 3.93 ■ 25 790 0 0.03 9 2 3.92 ■ 26 822 0 0.03 11 3 3.92 ■ 27 852 0 0.03 13 2 3.92 28 883 0 0.02 8 2 3.933 29 914 0 0.02 7 2 3.93 30 946 0 0.03 9 2 3.92 31 977 0 0.02 8 1 3.93 32 1008 0 0.02 8 2 3.93 33 1039 0 0.02 8 2 3.89 Lt. Deposits. 34 1071 0 0.02 8 1 3.93 35 1102 0 0.02 7 3 3.89 Lt. Deposits. 36 1134 0 0.02 6 1 3.93 37 1165 0 0.02 9 2 3.93 38 1196 0 0.02 7 2 3.93 39 1227 0 0.02 6 1 3.94 40 1258 0 0.02 6 3 3.94 41 1289 0 0.03 10 2 3.91 • 42 1319 0 0.03 10 2 3.93 43 1350 0 0.02 7 1 3.93 44 1381 0 0.03 11 2 3.92 IPenetration Body Metal Loss Body Page 1 • • PDS Report Joint Tabulation Sheet Well: 1G-15 Survey Date: May 25, 201 7 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 4.5 in. 12.6 ppf L-80 I BT-MOD Tubing 3.958 in. 0.271 in. 9 ft. 6,518 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 45 1413 0 0.02 7 2 3.93 46 1445 0 0.03 10 2 3.93 47 1476 0 0.02 8 2 3.92 48 150 7 0 0.02 9 2 3.92 49 1536 0 0.03 12 3 3.93 50 1566 0 0.03 10 2 3.93 • 51 1598 0 0.03 10 3 3.91 • 52 1629 0 0.02 8 2 3.94 1 53 1660 0 0.03 11 2 3.93 • 54 1691 0 0.03 11 2 3.93 si 55 1723 0 0.02 8 2 3.93 U 56 1754 0 0.04 14 2 3.94 57 1786 0 0.02 7 2 3.94 58 1817 0 0.02 8 3 3.92 • 59 1848 0 0.02 8 3 3.93 U 60 1879 0 0.02 7 2 3.94 61 1910 0 0.03 9 3 3.90 • 62 1941 0 0.02 8 2 3.88 Lt. Deposits. 63 1972 0 0.02 8 2 3.93 64 2003 0 0.02 8 2 3.94 • 65 203 5 0 0.02 8 2 3.90 66 206 5 0 0.02 7 1 3.93 67 2096 0 0.03 10 2 3.94 • 68 212 8 0 0.02 8 1 3.94 69 2159 0 0.03 10 2 3.93 • 70 2190 0 0.03 9 2 3.89 Lt. Deposits. 71 2221 0 0.02 8 2 3.94111 72 2252 0 0.02 8 2 3.94 73 2283 0 0.03 11 2 3.94 U 74 2314 0 0.02 8 2 3.94 75 2345 0 0.03 10 3 3.94 76 2376 0 0.02 7 3 3.87 Lt. Deposits. 77 2408 0 0.02 8 3 3.90 U 78 243 9 0 0.03 13 3 3.93 79 2470 0 0.02 9 2 3.93 80 2502 0 0.03 10 2 3.91 81 2533 0 0.03 10 2 3.93 81.1 2564 0 0.03 13 3 3.93 Pup 81.2 2574 0 0 0 0 3.78 GLM 1 (NO DEVIATION) 81.3 2581 0 0.03 10 3 3.95 Pup 82 2591 0 0.03 10 3 3.94 • 83 2622 0 0.02 8 2 3.93 84 2653 0 0.03 9 2 3.94 85 2684 0 0.03 10 2 3.93 • 86 2715 0 0.02 7 2 3.94 87 2747 0 0.02 9 2 3.93 • 88 2778 0 0.02 9 2 3.92 • 89 2810 0 0.03 10 2 3.92 • 90 2841 0 0.02 8 2 3.93 • 91 2872 0 0.03 11 3 3.93 IPenetration Body Metal Loss Body Page 2 • • 1111 fir.. Report PDS Joint Tabulation Sheet �-� Well: 1G-15 Survey Date: May 25, 2017 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 4.5 in. 12.6 ppf L-80 IBT-MOD Tubing 3.958 in. 0.271 in. 9 ft. 6,518 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 92 2904 0 0.03 10 2 3.92 93 293 5 0 0.02 9 2 3.93 94 2966 0 0.02 8 2 3.93 95 2997 0 0.04 15 2 3.92 Shallow Pitting. 96 302 8 0 0.02 8 3 3.94 97 305 8 0 0.03 10 2 3.93 98 3090 0 0.04 14 3 3.93 ■ 99 3121 0 0.03 11 3 3.93 ■ 100 3153 0 0.03 10 2 3.94 ■ 101 3182 0 0.03 10 2 3.94 ■ 102 3214 0 0.03 11 3 3.92 103 3245 0 0.03 10 2 3.92 104 3277 0 0.03 10 2 3.94 105 3308 0 0.02 8 2 3.93 106 3339 0 0.03 10 2 3.92 107 3370 0 0.03 12 3 3.93 ■ 108 3401 0 0.03 10 3 3.93 109 3430 0 0.02 8 2 3.92 110 3461 0 0.02 7 2 3.93 111 3493 0 0.03 10 3 3.91 112 3524 0 0.03 11 3 3.95 ■ 113 3554 0 0.03 11 2 3.93 ■ 114 3588 0 0.03 10 2 3.94 115 3619 0 0.03 10 2 3.93 116 3650 0 0.03 12 3 3.92 ■ 117 3681 0 0.03 10 2 3.94 ■ 118 3712 0 0.03 11 3 3.93 119 3744 0 0.03 9 3 3.93 120 3775 0 0.03 10 3 3.85 Lt. Deposits. ■ 120.1 3804 0.04 0.04 13 1 3.93 Pup 120.2 3814 0 0 0 0 3.71 GLM 2(LATCH @ 1:00) 120.3 3821 0 0.03 11 2 3.94 Pup 121 3831 0 0.02 9 2 3.93 122 3862 0 0.03 11 3 3.94 123 3893 0 0.02 9 3 3.93 124 3924 0 0.03 10 2 3.94 ■ 125 3956 0 0.03 11 3 3.94 126 3987 0 0.02 9 2 3.95 127 4018 0 0.04 13 3 3.92 128 4049 0 0.02 8 2 3.94 129 4080 0 0.03 10 2 3.95 ■ 130 4112 0 0.03 10 3 3.93 ■ 131 4143 0 0.04 14 4 3.93 132 4174 0 0.02 9 3 3.90 Lt. Deposits. 133 4205 0 0.03 11 3 3.93 134 4236 0 0.02 8 1 3.94 135 4267 0 0.03 9 3 3.95 ■ 136 4298 0 0.03 11 3 3.95 ■ 137 4329 0 0.03 11 3 3.94 138 4361 0 0.02 9 3 3.95 IPenetration Body Metal Loss Body Page 3 • PDS Report Joint Tabulation Sheet Well: 1G-15 Survey Date: May 25, 201 7 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 4.5 in. 12.6 ppf L-80 I BT-MOD Tubing 3.958 in. 0.271 in. 9 ft. 6,518 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 139 4393 0 0.03 10 2 3.93 ■� 140 4424 0 0.03 10 3 3.95 141 445 5 0 0.03 13 3 3.94 142 4486 0 0.03 10 2 3.94 143 4517 0 0.03 9 3 3.89 Lt. Deposits. ■I 144 4548 0 0.03 11 3 3.95 ■ 145 4579 0 0.03 9 2 3.95 • 146 4611 0 0.03 11 3 3.96 147 4642 0 0.02 9 4 3.95 148 4673 0 0.02 7 3 3.94 149 4705 0 0.02 9 3 3.95 150 473 6 0 0.03 11 3 3.96 ■ 151 4766 0 0.04 13 3 3.95 ■ 152 479 7 0 0.03 9 2 3.95 ■ 153 4829 0 0.03 11 2 3.94 • 154 4859 0 0.03 9 3 3.94 ■ 154.1 4891 0 0.03 12 2 3.96 Pup 154.2 4901 0 0 0 0 3.59 GLM 3(LATCH @ 9:00) 154.3 4907 0 0.03 11 2 3.95 Pup ■ 155 4918 0 0.03 9 2 3.93 156 4949 0 0.02 8 3 3.95 157 4981 0 0.03 10 3 3.95 158 5013 0 0.02 8 2 3.95 159 5043 0 0.03 11 2 3.93 160 5073 0 0.02 8 2 3.9511] 161 5103 0 0.02 8 3 3.90 162 513 5 0 0.03 10 3 3.94 • 163 5165 0 0.03 11 3 3.95 ■ 164 519 7 0 0.04 13 3 3.96 ■ 165 5229 0 0.03 11 3 3.95 ■ 166 5259 0 0.04 13 3 3.95 167 5290 0 0.03 9 3 3.95 168 5322 0 0.03 9 3 3.95 169 5353 0 0.03 13 3 3.95 170 5384 0 0.03 10 2 3.95 171 5414 0 0.03 10 2 3.95 172 5446 0 0.03 10 3 3.95 ■ 173 5477 0 0.04 13 3 3.95 174 550 7 0 0.02 8 2 3.95 175 5538 0 0.02 9 3 3.95 176 5569 0 0.03 9 3 3.91 176.1 5601 0 0.02 9 1 3.95 Pup 176.2 5610 0 0 0 0 3.85 GLM 4(LATCH @ 6:00) 11 176.3 5618 0 0.03 12 2 3.86 Pup Lt. Deposits. ■ 177 562 7 0 0.03 10 3 3.95 177.1 5658 0 0.02 6 1 3.95 Pup 177.2 5664 0 0 0 0 3.85 BAKER PREMIER PACKER 177.3 5671 0 0.01 5 1 3.92 Pup 177.4 5677 0 0 0 0 3.72 CAMCO DB NIPPLE 178 5678 0 0.02 8 3 3.93 Shallow Line of Pits. IPenetration Body Metal Loss Body Page 4 1111 PDS Report Joint Tabulation Sheet Well: 1G-15 Survey Date: May 25, 201 7 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc. Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 4.5 in. 12.6 ppf L-80 I BT-MOD Tubing 3.958 in. 0.271 in. 9 ft. 6,518 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 178.1 5710 0 0.03 9 3 3.93 Pup 178.2 5719 0 0 0 0 3.74 GLM 5(LATCH (41 7:00) 178.3 5727 0 0.03 11 1 3.95 Pup 179 5736 0 0.03 9 2 3.95 180 5768 0 0.02 6 2 3.88 Lt. Deposits. 181 5799 0 0.03 9 3 3.94 182 583 0 0 0.02 7 2 3.94 183 5861 0 0.02 8 2 3.94 184 5892 0 0.03 10 3 3.95 185 5924 0 0.03 10 2 3.94 186 5955 0 0.02 8 2 3.95 187 5987 0 0.03 10 4 3.94 ■ 188 6018 0 0.03 11 3 3.95 189 6049 0 0.03 10 3 3.95 190 6080 0 0.03 11 2 3.95 191 6112 0 0.02 8 2 3.95 192 6143 0 0.03 12 3 3.96 ■ 193 6174 0 0.03 12 3 3.95 ■ 194 6206 0 0.04 15 3 3.95 Shallow Pitting. 195 6237 0 0.02 7 1 3.95 196 6268 0 0.03 12 3 3.95 197 6299 0 0.03 10 4 3.93 • 198 6330 0 0.03 11 3 3.95 ■ 199 6362 0 0.03 11 3 3.95 200 6393 0 0.02 9 3 3.95 201 6424 0 0.03 13 4 3.95 ■ 202 6455 0 0.03 10 3 3.95 ■ 203 6486 0 0.03 10 3 3.91 203.1 6518 0 0 0 0 2.94 4.5"X 3.5"CROSS-OVER IPenetration Body Metal Loss Body Page 5 • • Minimum Diameter Profile Tra.S. Well: 1 G-15 Survey Date: May 25, 2017 Field: Kuparuk Tool Type: UW MFC 24 No. 211387 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 inches Country: USA Tubing I.D.: 2.992 inches Minimum Measured Diameters (in.) 1.75 2 2.25 2.5 2.75 -6,518 0.1 I � IL - 6,550 1 IL I 6,647 2.3 C E Z cu _ !: 6746 CI5 6,873 9 — 7,013 14 • • III PDS Report Overview Lie 5 Body Region Analysis Well: 1 G-15 Survey Date: May 25,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 inches Country: USA No. of Fingers: 24 Pipe 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Analyst: C.Waldrop Pipe Nom.OD Weight Grade&Thread Nom.ID Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD 2.992 in. 6,518 ft. 7,050 ft. Penetration(%wall) Damage Profile(%wall) 20 Jlimn Penetration body imm Metal loss body 11 0 50 100 15 , 1 10 5 GLM 6 (3:00) 0 0 to 20 to 40 to over 5 20% 40% 85% 85% Number of joints analyzed(total= 15) GLM 7 0 15 0 0 0 r Damage Configuration(body) 10 I 3 9 8I 6 4 2 0 - Isolated General Line Other Hole/ 14 Pitting Corrosion Corrosion Damage Pos.Hole Number of joints damaged(total= 1) GLM 8() 1 0 0 0 0 Bottom of Survey= 14.1 • • illi PDS Report Joint Tabulation Sheet Well: 1G-15 Survey Date: May 25, 201 7 Field: Kuparuk Analyst: C.Waldrop Company: ConocoPhillips Alaska,Inc Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Tubing 2.992 in. 0.254 in. 6,518 ft. 7,050 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 0.1 6518 0 0 0 0 2.96 4.5"X 3.5"CROSS-OVER 0.2 , 6519 0 0.03 13 4 2.94 Pup 1111 0.3 6525 0 0 0 0 2.96 BAKER SEAL ASSEMBLY 0.4 6538 0 0 0 0 3.41 BAKER 80-40 PBR 0.5 6542 0 0 0 0 2.88 BAKER FHL RETRIEVABLE PACKER 1 6550 0 0.03 10 2 2.97 ril 1.1 6581 0 0 0 0 2.80 OTIS X LANDING NIPPLE 2 6582 0 0.02 9 2 2.97 • 2.1 6615 0 0 0 0 2.90 OVERSHOT 2.2 6624 0 0 0 0 2.79 SEAL ASSEMBLY 2.3 6647 0 0 0 0 3.63 SBR 2.4 6669 0 0 0 0 2.90 OTIS RRH PACKER r 3 6676 0 0.03 11 4 2.93 Lt. Deposits. 3.1 6707 0 0 0 0 2.90 GLM 6(LATCH @ 3:00) 4 6714 0 0.02 6 3 2.94 ;I 5 6746 0 0.03 10 4 2.90 Lt. Deposits. 5.1 6777 0 0 0 0 2.80 GLM 7(LATCH POSITION UNKNOWN) 6 6784 0 0.03 10 4 2.92 Lt. Deposits. 7 6816 0 0.02 8 3 2.92 Lt. Deposits. 8 6845 0 0.03 12 3 2.71 Deposits. 9 6873 0 0.03 12 2 2.68 Deposits. 10 6901 0 0.04 17 6 2.92 Shallow Pitting. Lt. Deposits. 11 6925 0 0.01 5 2 2.95 12 6957 0 0.01 6 2 2.94 13 6984 0 0.02 7 2 2.93 Lt. Deposits. • 14 7013 0 0.02 9 4 2.94 r 14.1 7044 0 0 0 0 2.68 GLM 8(LATCH POSITION UNKNOWN) Penetration Body Metal Loss Body Page 1 • • PDS Report Cross Sections Well: 1 G-15 Survey Date: May 25,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubing: 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Analyst: C.Waldrop Cross Section for Joint 14.1 at depth 7,049.700 Tool speed= 47 Nominal ID=2.992 Nominal OD=3.5 Remaining wall area= 100% Tool deviation= 78° 401 V Minimum I.D.=2.680 in. Deposits Inside GLM 8 Minimum I.D.=2.68 in. HIGH SIDE=UP • • PDS Report Cross Sections 10, Well: 1 G-15 Survey Date: May 25,2017 Field: Kuparuk Tool Type: UW MFC 24 No.211387 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 Country: USA No. of Fingers: 24 Tubing: 3.5 in. 9.3 ppf L-80 EUE 8RD MOD Analyst: C.Waldrop Cross Section for Joint 9 at depth 6,880.490 ft. Tool speed=50 Nominal ID=2.992 Nominal OD=3.5 \\ Remaining wall area=96% 1 Tool deviation=27° / V 1 Minimum I.D.=2.684 in. Deposits Minimum I.D.=2.68 in. HIGH SIDE=UP ilk` a KUP PROD • 1G-15 Conocot-[]1t.iIIIps 1 Well Attributes (Max Angle&MD TD Alaska,1110 Wellbore API/UWI Field Name Wellbore StatusFind MI MD(ftKB) Act Btm IftKB) ap,ilhq 500292102400 KUPARUK RIVER UNIT PROD 38.12 5,325.00 7,533.0 ... • Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 113-15,10/2620141:14:05 PM SSSV:NIPPLE 380 8/14/2012 Last WO: 717/2004 41.00 10/29/1983 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag:SLM 7,166.0 10/25/2014 Rev Reason.TAG,SET PLUG,DUMP BAIL hipshkf 10/26/2014 HANGER;31.2 x+'.s II SAND ON PLUG Casing Strings t� Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len(I...Grade Top Thread CONDUCTOR _ 16 15.060_ 36.0 114.0 114.0 63.00 H-40 WELDED l l� r� Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND).. WOLen(I..Grade Top Thread (� was SURFACE 10 3/4 9.950. 36.5 2,202.3 2,202.1 40.00 J-55 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...WtlLen(I...Grade Top Thread IIII; I s PRODUCTION 7 6.276 34.2 7,502.2 6,934.4 26.00 J-55 BTC CONDUCTOR;36.0-114.0IIII Tubing Strings NIPPLE;496.4 Tubing Description String Ma...ID(in) Top(ftKB) I Set Depth(ft..J Set Depth(ND)(...I Wt Ilblft) (Grade (Top Connection TUBING 41/2 3.958 31.3 6,54391 6,113.7 12.60 L-80 IBT-MOD • Completion Details Nominal ID I Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) 31.3 31.3 0.00 HANGER 'MCEVOY TUBING HANGER 3.958 496.4 496.4 0.58 NIPPLE CAMCO DB-8 LANDING NIPPLE 3.813 SURFACE;36.5-2,202.3-• 5,671.1 5,384.0 35.56 PACKER BAKER PREMIER PACKER 3.875 GAS LIFT;2,585.9 5,683.8' 5,394.2 35.56 NIPPLE CAMCO DB NIPPLE 3.750 6,523.5 6,096.2 30.68 XO Reducing CROSSSOVER 4.5 x 3.5 3.500 6,532.2 6,103.7 30.61 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 3.000 GAS LIFT;5822.6 Tubing Description !String Ma...l ID(in) !Top(ftKB) I Set Depth(ft..I Set Depth(ND)(...l Wt(Ib/ft) !Grade (Top Connection TUBING 1998 31/2 2.992 6,542.0 6,6373 6,194.2 9.30 L-80 EUE8RMOD • Completion Details Nominal ID GAS LIFT;4508.7 mTop(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Corti - (in) MI 6,542.0 6,112.1 30.51 PBR BAKER 80-40 PBR 2.813 111 6,558.4 6,126.2 30.39 PACKER BAKER FHL RETRIEVABLE PACKER 2.969 6,597.1 6,159.6 30.55 NIPPLE OTIS X LANDING NIPPLE SELECTIVE PROFILE(SET 2.813 GAS LIFT;5,6174 a 8/10/99) II6,630.1 6,188.0 30.61 OVERSHOT OVERSHOT,NO SEALS,MAX OD 5.99"SET 8/10/1998 2.930 PACKER;5,671.1 Tubing Description !String Ma...1 ID(in) !Top(ftKB) Set Depth(ft..I Set Depth(ND)(...!Wt(Ib/ft) !Grade !Top Connection TUBING 1984 41/2 2.867 6,629.9 7,1157 6,603.2 9.30 J-55 FL4S NIPPLE;5,683.8 Mr Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) GAS LIFT;9726.6 6,643.7 6,199.7 30.56 SBR OTIS SBR 2/2.813 X-PROFILE SET 8/10/1998 2.813 • 6,669.9 6,222.3 30.64 PACKER OTIS RRH PACKER 2.970 6,815.7 6,347.8 30.67 BLAST RINGS CARBIDE BLAST RINGS(3) 2.867 t_f 6,928.0 6,443.9 31.65 BLAST RINGS CARBIDE BLAST RINGS(3) 2.867 SEAL ASSY;6,532.2 M 7,084.0 6,576.3 31.75 LOCATOR OTIS LOCATOR 3.000 PBR;6,542.0 7,085.5 6,577.6 31.74 PACKER OTIS WD PACKER 4.000 PACKER;6,558.4 7,089.1 6,580.6 31.73 MILL EXT OTIS MILL OUT EXTENSION 4.410 NIPPLE;6,597.1 'N7,105.2 6,594.3 31.65 NIPPLE CAMCO D NIPPLE NO GO 2.750 7,114.8 6,602.5 31.59 WLEG OTIS WIRELINE RE-ENTRY GUIDE,ELMD TTL @ 7111 3.000 OVERSHOT;6,630.1, I'` 'I during PPROF on 3/9/2006 TUBING;8,629.9 SBR;6,643.7 ,a Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) PACKER;6,669.9 Top(ND) Top Incl 1 Top(ftKB) (ftKB) CI Des Com Run Date ID(in) PRODUCTION;6,7076 7,095.2 6,585.8 31.70 SAND DUMP BAILED 10'OF SAND ON PLUG 10/25/2014 0.000 1. 7,105.2 6,594.3 31.65 PLUG 2.75"CA-2 PLUG 10/25/2014 0.000 PRODUCTION;6,777.1 7,5100 6,941.1 30.92 FISH DROPPED 1"HFCV,BEK LATCH TO BOTTOM 1/14/2009 0.000 MI Perforations&Slots IPERF;6.834.0-6,838.0-- Shot Dens (PERF;6,843.0.9880.0 Top(ftKB) Btm(ftKB) Top MKS) B(ftKB) ) Zone Date (sht)ts/f Type Com 6,834.0 6,838.0 6,363.5 6,367.0 C-4,1G-15 1/31/1984 12.0 (PERF 120 deg Phasing;5"DA IPERF;6,890 0.6.895.0- - 6,843.0 6,880.0 6,371.3 6,402.9 C-4,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA 6,890.0 6,895.0 6,411.5 6,415.7 C-3,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA 6,954.0 7,007.0 6,466.0 6,510.9 C-1,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA (PERF;6,9540-7,007.0- 7,193.0 7,230.0 6,669.3 6,701.0 A-5,A-4,A-3, 5/23/1984 8.0 APERF 90 deg Phasing;2 1/16" 1G-15 RigidJet Mandrel Inserts St PRODUCTION;7,045.3 - - atl l on Top(ND) Valve Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com LOCATOR;7084.0 { 2,585.9 2,585.7 CAMCO KBG-2 1 GAS LIFT GLV BK 0.188 1,260.0 5/3/2008 PACKER;7,085.5 2 3,822.8' 3,821.6 CAMCO KBG-2 1 GAS LIFT OV BK 0.250 0.0 5/3/2008 MILL EXT;7989.7 p/7- 3 4,908.7 4,777.2 CAMCO KBG-2 1 GAS LIFT DMY BK-3 0.000 0.0 7/7/2004 ;......_ 4 5,617.4 5,340.3 CAMCO KBG-2 1 GAS LIFT DMY BK • 0.000 0.0 7/13/2004 SANE;7,095.2-\ NIPPLE;7,105.2, 5 5,726.6 5,429.1 CAMCO KBG-2 1 GAS LIFT DMY BK-3 0.000 0.0 7/7/2004 / PLUG;7,105.2 '/ 6 6,707.5 6,254.6 OTIS SPM 1 PROD HFCV BEK 0.000 0.0 3/26/2014 //. 7 6,777.1 6,314.5 OTIS SPM 1 PROD HFCV BEK 0.000 0.0 3/25/2014 WLEG;7,114.8 r8 7,045.3 6,543.4 OTIS SPM 1 PROD HFCV BRK 0.000 0.0 3/24/2014 _ Notes:General&Safety APERF;7.193.0.7,230,0- End Date Annotation 3/10/1998 NOTE:Ran KINLEY Caliper Log from 6444'RKB to Surface on 3/10/98 11/8/1998 NOTE:ORIGINAL COMPLETION BELOW 6630' 7/7/2004 NOTE:EXISTING COMPLETION PLUS ORIGINAL COMPLETION,BELOW 6542' 7/7/2004 NOTE:TREE:McEVOY/GEN 1 RETROFITTED TO CAMERON GEN 4 PRODUCTION;34.2-7,502.2--- 9/21/2010 NOTE:Mandrels @ 6707-7045-MACCO SLOTTED DPHF FISH;7,510.0---------, KUP PROD • 1G-15 Conoco hillips -" a Alaska,Inc. Conur Phillip 1G-15,1 0/2 612 01 4 1'.14'.06 PM Vertical schematic(actual) .................. HANGER _... ,3................... HANGER;31.2 ,. Notes:General&Safety ti . 1,1 End Date Annotation i 9/21/2010 NOTE:View Schematic w/Alaska Schematic9.0 ��p m�,J uuu.3/24/2014 NOTE:BROKEN LATCH AT 7045'RKB �I; IL CONDUCTOR;36.0-114.0 1111 NIPPLE;496.4 ra SURFACE;36.5-2.202.3--. alle GAS LIFT,2,585.9 t GAS LIFT;3,822.8 ..- III 822.8I' GAS LIFT;4,908.7 M GAS LIFT;5,617.4 PACKER;5,671.1 NIPPLE;8683.8 In GAS LIFT;5,728.6 w SEAL ASSY;6,532.2 1 74 PBR.6,542.0 A ilt PACKER;6,558.4 NIPPLE;6,597.1 OVERSHOT;6,630.1-. TUBING,6,629.9 SBR;6,643.7 I _ PACKER;6,669.9 Mt PRODUCTION;6,707.5 PRODUCTION;6,777.1 �I , `^C IPERF;6.834.0-6,838.0- 111 - IPERF;6,843.0.6,880.0 1 I I PERF;6.890.0-6,895.0- _ I • IPERF;6,954.0.7,007.0--. i PRODUCTION;7,045.3 LOCATOR;7,084.0 L PACKER;7,085.5 MILL EXT;7,089.1 t- SAND;7,095 2, NIPPLE;7,105.2-\ / PLUG;7,105.2 II WLEG;7,114.8 ■ APERF;7,193.0-7,230.0- PRODUCTION;34.2-7,502.2---- FISH,7,510.04 0 • o 0 e) OO, N N i_ ? X 1v Y L -0 ° M 7. �O I-eli <l9._ 4-' f0 a) N 1 . EO U E U p C .. ro a C OO Y O a co C 4' w s 0 v 113 a Q F ,- E a Cr m < O r r- r r r r r r r r r N O 444 -• N e- M , T ,- ,- M 2 Le) Fv f0 r 0o O ° ii 0 a5 .2, . '-. ru v -0 u 0 0 0 0 0 0 0 0 0 0 0 0 RS 0 O ` a) 0 ` Lu J J J J J J J J J J J J 40 c - U �O W W W W W W W W W W W W '^ v L11) O F- LL LL LL LL LL LL LL LL LL LL LL LL O. CU j 0) C Q J J J J J J J J J J J J v N C COOlt '' Q a Q Q Q a Q Q Q Q a Q ZZZZZZZZZZZZ u L Q) O a) > • 0) a O ±,l LL LL U.. LL LL LL LL LL LL LL LL LL CC Q OWE rro > N E a a C) N U u N � G >T i Z c O ,4.7. r0 ., 0v O ro a)u ro s G O tiQ cC a a c a }y • ✓ {- O jl p LL co a Er) O J a 0 J J a J d • gQ � 3mTm Sao •oaoo •0o �1 TS if; G m u) O H O U cc 1 wal Q > N 8 t t4 J r ^1\ Qj I o v o asp' 0 ~ 9tis a 0 N z x wo .r CO V d J J J J J J J J J J J J 4 ro M a 3 3 3 3 3 3 v Z ea 82za „ W � � w 0 a) Z .i.-pig ,...."1/1 P ceeccertw cercw eetrcew E V W W W www W www W W r VS U.' > > > > > > > > > > > > in Q z Y Y Y Y Y Y Y Y Y Y Y Y O > > > > > 0 > > > > > > .w W Scectrececrixcecerececec w a a a a a a a a a a a a a 1 LL a a a a a a a a a a a a V > > > > > > > > > > > > O C Y Y Y Y Y Y Y Y Y Y Y Y r� u N / ♦ °4ro mw v X N Q� W C) N C) N N- CO 0) 0 N M Tr LU V 0 r CO CO CO CO N N N N O O O O O O O O O O O O ro Q O O 0 O O O O 0 O O O O O O O O O O O O O O O O 'O Q © r r r N N u) to to N CO CO a0 CO CO CO a a a a a a r0 LU M M 2 2 2 � � � �, � � � W 0 0 0 0 0 O 0 0 0 0 0 at u CC x u c9 O O o 0 0 a a 0 0 0 0 0 c o 0 0 0 0 0 0 0 0 0 0 0 00 a iS 4 In a 4 O 1n 1A OO N e- N M r N e- N r 0) U) O O �Vf g 0) N N 0 N+) e- 0 0 0) 0) 0 O U CO CO e- M O N N L 0 N N N N N N N N N N N N N ID g' 0) O) O O ch O M N O) 0) 0) OJ ,n E N N N N N N N O N N N N 01 O O O O O O O )'O O O O 3 - aa a a a a a a a a a a V 0 U., ® 0� C IA u1 Co )() u) )f) N )[1 in 1n u) 1A _a V C �'i GJ M Q) ens Sa)C. E CC c c to p 7 a` 41 ill "' Z b Q O N ") e- O co co t0 N ao ao O) — E W N O r 0 0 0 N N N O .' p� V1 (� z } W (9 ' C7 C7 CO m 0 z a S Q t8 v- ,- N ,- N N M N N N Z Vhf Y To Z� , - U N j C .0 GJ c0 OC/� $ Q � > H a` a Q • OF 711, 4):,,� 7 s, THE STATE Alaska Oil and Gas ti -s_ of/® TAsKAL Conservation Commission '‘11- --1-614- __ I. 333 West Seventh Avenue C4'41/, h„� GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov James Ohlinger Staff CTD Engineer Sego VI 9 LJ tA` t ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage,AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1G-15 Permit to Drill Number: 183-148 Sundry Number: 317-158 Dear Mr. Ohlinger: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this 44 day of April,2017. RBDMS L MP( - 1 2017 • • RECEIVED STATE OF ALASKA APR 9 207 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS G 20 AAC 25.280 CC 1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑✓ ' Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: '4.Current Well Class: 5.Permit to Drill Number: ConocoPhillips Alaska,Inc. Exploratory ❑ Development E. 183-148 3.Address: ❑ 6.API Number: Stratigraphic ❑ Service PO Box 100360,Anchorage,AK 99510 50-029-21024-00 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Kuparuk River Unit Will planned perforations require a spacing exception? Yes ❑ No ® nu 1G-15 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 25640, A614-2-5-7-1- *8 Kuparuk River Field/Kuparuk Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 7533' 6963' 7095' 6586' 3265 7105' 7510' Casing Length Size MD TVD Burst Collapse Structural Conductor 78' 16" 114' 114' Surface 2166' 10-3/4" 2202' 2205' Intermediate Production 7468' 7" 7502' 6935' Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 6834'-7230' + 6364'-6701' 4-1/2"x 3-1/2" L-80 x J-55 7116' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): Baker Premier,Baker FHL,Otis RRH,Otis WD 5671'/ 5384', 6558'/6126', 6670'/6223', 7086'/6578' 0 12.Attachments: Proposal Summary Q Wellbore schematic E 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ Development 1E, Service ❑ 14.Estimated Date for 15.Well Status after proposed work: __Ar" 1-May-17 Commencing Operations: OIL El WINJ CI WDSPL ❑ Suspended LJ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG [] Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned L 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: James Ohlinger Contact Name: William Long Authorized Title: Staff CTD Engineer Contact Email: William.R.Long@ConocoPhillips.com g@ConocoPhillips.com ��i iG ' Contact Phone: 907-263-4372 Authorized Signature: Date: COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 6-13i /— 1t Plug Integrity ❑ BOP Test e Mechanical Integrity Test ❑ Location Clearance CI P c y .(o 1,211 Other: 0 0p fir-$t p rc...5 Svrc o 3£3127 p51 fTr)nvt6Y prt111 1,zh * tr5t to 2 '-- x.5`5 ffiftvviafr piv, p la c rV-k I ry `t appry v'«( pt-v. Post Initial Injection MIT Req'd? Yes ❑ No 204A--C23. i/ i) Spacing Exception Required? Yes ❑ No Subsequent Form Required: it — 4 U RDDI IS (— r""v, - 3 2017 APPROVEDY /i;Approved by: ��� COMMISSIONER THHE COMMMMISS � 2L SION Date: l ,p4 / Ji7- , fazo 4 VrL-4/24// Submit Form and Form 10-403 Revised 4/2017 0 RrialaNcAtvalid for 12 months from the date of approval. Attachments in Duplicate • I s ConocoPhillip Alaska P.O. BOX 100360 C ANCHORAGE,ALASKA 99510-0360 APR 1 9 2017 April 18, 2017 AO GCC -State of Alaska �, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby applies for sundry approval to plug for redrill Kuparuk River Unit 1G-15. Permit to drill applications will be submitted at a later date to drill CTD laterals out of the Kuparuk well 1G-15 using the coiled tubing drilling rig, Nabors CDR3-AC. Pre-rig operations are scheduled to begin in early May 2017 followed by CTD sidetrack in late May 2017. The CTD laterals will target the C sand intervals. A slickline plug is in place at 7105' MD with sand on top, cement will be placed above this plug and squeezed in the 3.5"x 7" annulus of well 1G-15 to facilitate a casing exit for these laterals, which will likewise effectively plug off the existing A/C-sand perforations. ConocoPhillips requests a variance from the plugging requirements of 20 AAC 25.112 (c)to facilitate the casing exit of the 1G-15 horizontal laterals. The proposed plugging procedure meets the overall objective of this section, providing an equally effective plugging of the well to prevent migration of fluids to other hydrocarbon zones or freshwater. Attached to this application are the following documents: — 10-403 Sundry application to plug C-sand perfs in 1G-15 — Summary for Plugging Sundry — Current Wellbore Schematic If you have any questions or require additional information, please contact me at 907-263-4372. Sincerely, 4///(X William R. Long Coiled Tubing Drilling Engineer 907-263-4372 • • KRU 1G-15 CTD Summary for Plugging Sundry (10-403) Summary of Operations: KRU well 1G-15 is a Kuparuk A/C-sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will target the C sands. The laterals will access stranded resources in multiple fault blocks. Prior to CTD operations we will pump cement on top of a plug set at 7105' and squeeze off the C sand perfs abandoning both A and C sand intervals. ConocoPhillips requests a variance from the requirements of 20 AAC 25.112(c)(1) to plug the A-sand and C-sand perforations in this manner. Following the cement squeeze, cement will be milled out in tubing and a whip-stock will be set. Following this Nabors CDR3-AC will drill laterals to recover additional resources in the C sand. Permit to drill applications will be submitted once well plans are finalized. Using the maximum formation pressure in the area of 10.9 PPG in 1G-04, the maximum potential surface pressure, assuming a gas gradient of 0.1 psi/ft, would be 3265 psi. CTD Drill and Complete 1G-15 Laterals: Pre-CTD Work 1. Slick-line: Pull gas lift valves and dummy. Leave mandrels open at 7045' and 6707' to place cement behind tubing. 2. Coiled Tubing: Pump cement from 7090' to 6700', squeeze C sand. 3. Coiled Tubing: Mill and under-ream cement in tubing. 4. Slick-line: Drift whip-stock down to set depth. 5. E-line: Set whip-stock Riq Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 1G-15A Sidetrack a. Mill 2.80" window through production tubing and casing between 6707' and 7045'. b. Drill lateral with bi-center bit and run 2%" slotted liner with an aluminum billet 3. 1G-15AL1 Lateral a. Kick off the aluminum billet in 1G-15A. b. Drill lateral with bi-center bit and run 2%" slotted liner with an aluminum billet 4. 1G-15AL2 Lateral a. Kick off the aluminum billet in 1 G-15AL1. b. Drill lateral with bi-center bit and run 2%" slotted liner in open hole and solid liner inside production casing 5. Freeze protect, obtain SBHP, set BPV, ND BOPE, and RDMO Nabors CRD3- AC. COO GUr. 74r -Co1Pci" well /( keel �/0�✓G"I� kid-/ Cl d R ,'r eKc• S ct:53 y lrea f and t / pi/ 1141 ' toage 1 of 2!� ra �✓fv ' " !p U, P oij Thr} / �s /'Bdi' 1/ 'ly&//,/18/2O17 4(aw 44a^ /;1#42SWC /eeaetry 4,0,-0 7-44 prrfa o,, 4c SO` • • Post-Rig Work 1. Pull BPV 2. Install gas lift design 3. Return to production Page 2 of 2 4/18/2017 KUPD 1 G-1 5 ConocoPhiflips ¢ Well Attribute Max Angle D TD Alask;.Ir'1(. Wellbore API/UWI Field Name Wellbore Status ncl(°) MD(ftKB) Act BIme(ftKB) • CorrOc tit' Mips 500292102400 KUPARUK RIVER UNIT PROD 38.12 5,325.00 7,533.0 ••- Comment H25(ppm) Date Annotation End Date KBGrd(ft) Rig Release Date 11-15,4/19/20175:59:28 AM SSSV:NIPPLE 450 7/31/2015 Last WO: 7/7/2004 41.00 10/29/1983 Vertical srhemabc factual).... Annotation Depth(ftKB) End Date Annotation Last Mod By End Date HANGER;31.2 Last Tag:SLM 7,166.0 10/25/2014 Rev Reason:TAG,SET PLUG,DUMP BAIL hipshkf 10/26/2014 SAND ON PLUG jak Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread �4al� CONDUCTOR 16 15.060 36.0 114.0 114.0 63.00 H-40 WELDED W �j Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread ^takuku^ttuazu kaftua kukkea" m.lull.SURFACE 10 3/4 9.950 36.5 2,202.3 2202.1 40.00 J-55 BTC I I 111^Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... WtlLen(I...Grade Top Thread • PRODUCTION 7 6276 342 7,502.2 6,934.4 26.00 J-55 BTC CONDUCTOR;36.0-114,0Tubing Strings NIPPLE;496.4 �.�' Tubing Description String Ma...ID lin/ Top(ft(B) Set Depth(ft. Set Depth IND)(...Wt(IbIft) Grade Top Connection TUBING 1 41121 3.9581 31.31 6,543.91 6,113.71 12.601 L-80 IIBT-MOD Completion Details • Nominal ID IIII Top(ftKB) Top(ND)(ftKB) Top Incl(°1 Item Des Com (in) • • 31.3 31.3 0.00 HANGER MCEVOY TUBING HANGER 3.958 SURFACE;36.5-2,202.3 496,4 496.4 0.58 NIPPLE CAMCO DB-8 LANDING NIPPLE 3.813 5,671.1 5,384.0 35.56 PACKER BAKER PREMIER PACKER 3.875 GAS LIFT;2,585.9 'AE g 5,683.8 5,394.2 35.56 NIPPLE CAMCO DB NIPPLE 3.750 I' 6,523.5 6,096.2 30.68 XO Reducing CROSSSOVER 4.5 x 3.5 3.500 6,532.2 6,103.7 30.61 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 3.000 GAS LIFT;3,822.8 Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(Ib/ft) Grade Top Connection TUBING 1998 1 3 1/21 2.9921 6,542 .0 6,637.31 6,194.21 9.301L-80 [Top IIIII Completion Details Nominal ID GAS LIFT;4,908.7 1:; Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) 6,542.0 6,112.1 30.51 PBR BAKER 800 PBR 2.813 6,558.4 6,126.2 30.39 PACKER BAKER FHL RETRIEVABLE PACKER 2.969 GAS LIFT;5,617A6,597.1 6,159.6 30.55 NIPPLE OTIS X LANDING NIPPLE SELECTIVE PROFILE(SET 2.813 Ill 8/10/99) Wili Lall6,630.1 6,188.0 30.61 OVERSHOT OVERSHOT,NO SEALS,MAX OD 5.99"SET 8/10/1998 2.930 PACKER;5,871.1 `° Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)I...Wt(Ibi t) Grade Top Connection TUBING 1984 1 41/21 2.8671 6.6299 7,11571 6.60321 9301)-55 1FL4S NIPPLE;5,683.8 .� Completion Details Nominal ID Sr Top(RKB) Top(ND)(RKB) Top Incl(°) Item Des Com (in) GAS LIFT;5,726.6 6,643.7 6,199.7 30.56 SBR OTIS SBR 2/2.813 X-PROFILE SET 8/10/1998 2.813 1111 6,669.9 6,222.3 30.64 PACKER OTIS RRH PACKER 2.970 Mk.It RINGS 6,815.7 6,347.8 30.67 BLAST CARBIDE BLAST RINGS(3) 2.867 RINGS 6,928.0 6,443.9 31.65 BLAST CARBIDE BLAST RINGS(3) 2.867 SEAL ASSY;6,532.2 RINGS ' '. 7,084.0 6,576.3 31.75 LOCATOR OTIS LOCATOR 3.000 PBR;6,542.0 MN 7,085.5 6,577.6 31.74 PACKER OTIS WD PACKER 4.000 PACKER;8,558.4 7,089.1 6,580.6 31.73 MILL EXT OTIS MILL OUT EXTENSION 4.410 NIPPLE;6,597.1 7,105.2 6,594.3 31.65 NIPPLE CAMCO D NIPPLE NO GO 2.750 OVERSHOT;6,630.1` I;311.I 7,114.8 6,602.5 31.59 WLEG OTIS WIRELINE RE-ENTRY GUIDE,ELMD TTL @7111 3.000 TUBING;6,629.9 during PPROF on 3/9/2006 SBR;6,643.7 I® Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) PACKER;6,669.9 Top(TVD) Top Incl ; Top(ftKB) (ftKB) (°) Des Com Run Date ID(in) PRODUCTION;6,707.5 �'-1. 7,095.2 6,585.8 31.70 SAND DUMP BAILED 10'OF SAND ON PLUG 10/25/2014 0.000 OM- 7,105.2 6,594.3 31.65 PLUG 2.75"CA-2 PLUG 10/25/2014 0.000 PRODUCTION,6,777.1 gi 7,510.0 6,941.1 30.92 FISH DROPPED 1"HFCV,BEK LATCH TO BOTTOM 1/14/2009 0.000 Ilif Perforations&Slots (PERF;6,834.0-6,836.0 Shot IPERF;6,843.08,680.0 Top(ND) Btm(ND) Dens (shots/ lop(RKB) Btm(RKB) (ftKB) (ftKB) Zone Date ft) Type Com (PERF;8,890.0-6,895.0-4 6,834.0 6,838.0 6,363.5 6,367.0 C-4,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA 1 6,843.0 6,880.0 6,371.3 6,402.9 C-4,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA ilt 6,890.0 6,895.0 6,411.5 6,415.7 C-3,1G-15 1/31/1984 12.0 (PERF 120 deg Phasing;5"DA 6,954.0 7,007.0 6,466.0 6,510.9 C-1,1G-15 1/31/1984 12.0 IPERF 120 deg Phasing;5"DA (PERF;6,954.0-7,007.0 7,193.0 7,230.0 6,669.3 6,701.0 A-5,A-4,A-3, 5/23/1984 8.0 APERF 90 deg Phasing;21/16" 1G-15 RigidJet 4 Mandrel Inserts PRODUCTION;7,045.3 St ati on Top(ND) Valve Latch Port Size TRO Run LOCATOR;7,084.0RE N, Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com �_ 1 2,585.9 2,585.7 CAMCO KBG-2 1 GAS LIFT GLV BK 0.188 1,260.0 5/3/2008 PACKER;7,085.5 ..y 2 3,822.8 3,821.6 CAMCO KBG-2 1 GAS LIFT OV BK 0.250 0.0 5/3/2008 MILL EXT;7,089.1 �- - r....'.:``: 3 4,908.7 4,777.2 CAMCO KBG-2 1 GAS LIFT DMY BK-3 0.000 0.0 7/7/2004 SAND;7,096.2 4 5,617.4 5,340.3 CAMCO KBG-2 1 GAS LIFT DMY BK 0.000 0.0 7/13/2004 NIPPLE;7,105.2 • 5 5,726.6 5,429.1 CAMCO KBG-2 1 GAS LIFT DMY BK-3 0.000 0.0 7/7/2004 PLUG;7,105.2 �; 6 6,707.5 6,254.6 OTIS SPM 1 PROD 'HFCV BEK 0.000 0.0 3/26/2014 7 6,777.1 6,314.5 OTIS SPM 1 PROD HFCV BEK 0.000 0.0 3/25/2014 WLEG;7,114.8 ':IIT 8 7,045.3 6.543.4 OTIS SPM 1 PROD HFCV BRK 0.000 0.0 3/24/2014 APERF;7,193.0-7,230 0- I ( Notes:General&Safety End Date Annotation 3/10/1998 NOTE:Ran KINLEY Caliper Log from 6444'RKB to Surface on 300/98 11/8/1996 NOTE:ORIGINAL COMPLETION BELOW 6630' 7/7/2004 NOTE:TREE: McEVOY/GEN 1 RETROFITTED TO CAMERON GEN 4 7/7/2004 NOTE:EXISTING COMPLETION PLUS ORIGINAL COMPLETION,BELOW 6542' PRODUCTION;34.2-7,502.2 9/21/2010 NOTE:Mandrels @ 6707-7045-MACCO SLOTTED DPHF FISH;7510.0 -. KUP �D • 1G-15 ConocoPhillips 1 Alaska• .Inc. cawoalaups 1G-15,4/1912017 5:5928 AM Vernal W191na10(oetanl)>.... 1 HANGER,31.2 Notes:General&Safety End Date Annotation I, 9/21/2010 NOTE:View Schematic w/Alaska Schematic9.0 141 % .' I...3/24/2014 NOTE:BROKEN LATCH AT 7045'RKB I I €� CONDUCTOR;36.0-114.0 Ir NIPPLE;496.4 � AK : SURFACE;38.52,202.3 l Ai GAS LIFT;2,585.9 4: I'lir GAS LIFT,3,822.8 I GAS LIFT;4,908.7 /' GAS LIFT;5,617 4 II PACKER;5,671.1 NIPPLE;5603.8 GAS LIFT.5,726 6 I. ¢'. SEAL ASSY,6,532.2 ZS- PBR;6,542.0 i PACKER;6,558.4 NIPPLE,6,597.1 4 T OVERSHOT;8,630.1 �x:l TUBING,6,629.9 I a SBR,6,643.7 I? PACKER,6,669.9 ni PRODUCTION;6,707.5 Ilir OM PRODUCTION;8,777.1 ' It (PERF;6,834.0-6,838.0— . — (PERF;6,843.08,880.0— . IPERF;6,890-08,895.0 . a f !FEU,6,954.0.7007.0 _ PRODUCTION;7,045.3 LOCATOR;7,064.0 1� NM PACKER;7,085.5 MILL EXT;7,089.1 r3 4 SAND;7,095.2– NIPPLE;7,105.2, PLUG;7,105.2 V WLEG;7,114.8 ::j II' APERF;7,193.0.7,230.0 PRODUCTION;34.2-7,502.2 FISH;7,5100 • • • • 1G-15 Proposed Pre-CTD Schematic 4-1/2"Camco DB nipple @ 496'MD(3.75"min ID) 16"62#H-40 shoe 4-1/2"12.6#L 80 EUE 8rd Tubing to surface @ 114'MD 4-1/2"Camco gas lift mandrels @ 2586', 3823',4909',5617'MD --....vis id....:..,..—. Baker Premier Packer @ 5671'MD(3.875"ID) 4-1/2"Camco DB nipple @ 5684'MD(3.75"min ID) 10-3/4"40#J-55 shoe 4-1/2"Camco gas lift mandrel @ 5727'MD @ 2202'MD :' C Crossover 4.5"x 3.5"@ 6524'MD Baker 80-40 PBR @ 6542'MD Baker FHL Packer @ 6558'MD rf.' Otis X-Nipple @ 6597'MD(2.813"ID) Overshot @ 6630'MD «F Otis SBR @ 6644'MD(2.813"ID,X-profile) Otis Packer @ 6670'MD 3-1/2"Otis production mandrels @ 6708'and 6777'MD [ 1 C-sand perfs BLAST JOINTS across Perfs 6834'-6838'MD 3-1/2"Otis production mandrel @ 7045'MD 6843'-6880'MD a,-----« 6890'-6898'MD / Otis WD Packer @ 7086'MD(4.0"ID) 6954' 7007'MD ,,: Otis Mill Out Ext.@ 7089'MD / 3-1/2"Camco D landing nipple @ 7105'MD 2.75"min ID . CA-2 Plug Installed -Cement spotted between — k — 10'of sand on plug GLMs. - - - -Squeezed into C-sand 3-1/2"Otis WLEG @ 7115'MD perfs. = -{ < e -- -Milled out for whipstock. — '1 � �q y A-sand perfs HH.Haged) 7193'-7230'MD '+r if i ti 7"26#J-55 shoe @ 7502'MD —.00/ `.— • • 'Loepp, Victoria T (DOA) From: Long,William R <William.R.Long@conocophillips.com> Sent Monday,April 24, 2017 3:19 PM To: Loepp,Victoria T(DOA) Subject: RE: KRU 1G-15(PTD 183-148) Plug for Redrill Attachments: 1G-15 Pre-CTD Schematic.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, Provided that the ND of the CTD laterals does not differ from the maximum ND of the original wellbore,the BOP test pressure for CTD sidetrack will be 3800 psi. (We are still working on the well plans for this project.) Please find attached a proposed schematic for the pre-CTD scope of work. Please let me know if there is any additional detail that I can provide. Thanks, William R. Long Sr CTD Engineer ConocoPhillips 907-263-4372(office) 281-723-6000(cell) William.R.Long@ConocoPhillips.com From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Monday,April 24, 2017 1:28 PM To: Long,William R<William.R.Long@conocophillips.com> Subject: [EXTERNAL)RE: KRU 1G-15(PTD 183-148) Plug for Redrill Also,what is the BOP test pressure for drilling the laterals. From: Loepp,Victoria T(DOA) Sent: Monday,April 24, 2017 1:27 PM To: 'William.r.long@conocophillips.com'<William.r.long@conocophillips.com> Subject: KRU 1G-15(PTD 183-148) Plug for Redrill William, Please provide a better wellbore schematic showing the plug for redrill. Thanx, Victoria 1 • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend"boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Ge logist work) the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD"into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill"code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill"comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time,they will also review the list of suspended wells for accuracy. 1'61 CP • • ` WW U hSv Z as w OW J~03 U CO > U) Ox CO Q p`7 L c VOI Rig U m O co u rn j +� .„ • C O E 8 W -0 I-cc it .`'ci (0 N (0 (O 0_ Q Ca lJJ N N O co (D O (O N O N E 1E CO Q e- e- r L U 4••' H ~ CO CO l6 CO CO 03 f6 U))) +0 C C 4-, N H 2 W 2 2 2 z 2 2 2 E (o Q a) Z Z 44 Q N 00 00 N e- e- e- O @ cu Q v Q U O O Q., u H 0 0 0 0 0 0 0 (moo• co u L cs J J J J J J J = L 4 L W W W W W W Wop (O 0 0 LL LL LL LL LL LL LL 47 a) E -0 ''' O < J J J J J J J a O C a) U) H < < < < < < < +' c Z 6 Q Z Z Z Z Z Z Z a) O • C �. I1. U. LI. LL U. LL LL 0) ^ u 2 L a) O y, L o ,, O_ a) �+ 'p U �..tti (..1 0 c O sa c a) 0. ro N a) 2 zZ E CO 0:1 .� U f"' < a1 L OU U .0 41 ):. N Q LL LL LL it 1 Cp R O d O 2 O 0) CC CC C.. J d J d V d d O O Q - a o a a CO , co 03 v 0 4) c , c co 0 t0 oto °baC : ' g ca � 'Sc; to °x � � 0x` tt T ° cs, > E , , Fztv0 - 3333 WUC7 N 4 11:)° Z Z Z Z Z Z Z W w ceccceQ' w c y 2 W W W W W W W Q > > > > > > > E D Y Y Y Y Y Y Y U DDDDD = A 2.?LL w w ecce w ce .... c I.r) Q Q Q Q Q Q QO CL a a a LL LL a al �f..� G. y W.,.... N N in co O N h X N U0 0� Q 00 0 CO 0 N O CO WI ^ O O O O O O O ro �. 0 - O O O O O O 0 .- 1j 4t 6 6 0S 81 E A V .�.Q N Q2 .3 N N N 0 a) -1....1W 0 0 0 0 0 0 0 VI C RS 4.• � 0 fa o 0 0 0 o O 4 0 0 (o 0 0 0 N N (O O) h CO N U) C Oa E Cr m 0 N N e- N N ryN N N 0 N O ' N N N N N N N L U n O) O) O) O) O) () T O 13 0 N N N NN 0 N N U) 01 O O O O O O _ ...r O O O O O O O N N N N N N N 3a1 Lrl eaZ cu Q1 u c6 V, p) E a) > 8 w OC c E alD u'�� 4 N f z N N N To 0)E -. N d Q N J N J M Z a) rO ,- W r N c y, VI e� 1 A n 3 cvl 8 coa L I dC p E a, o Q) � a a Q ~ge Project Well History File~lver Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. - We,, .,.,o,.,, ,=,,e RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes, No. [] Maps: [] Grayscale items: [] Other, No/Type [] Other items scannable by large scanner [3 Poor Quality Originals: OVERSIZED (Non-Scannable) [] Other: [] Logs of various kinds NOTES: - [] Other BY: BEVERLY BREN VlNOENT SHERYL MARIA LOWELL DATE: /S/ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ Sca~lningPreparation L~ x30= IC:~ BY; BEVERLY BREN VINCENT SHERY~ LOWELL TOTAL PAGES Production Scanning ~._ Stage l PAGE COUNT FROM SCANNED FILE: I PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: X YES NO Stage 2 BY~ (SCANNING I$ COMPLETE AT THIS POINT UNLESS SPECIAL A'I-rENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUAUTY. GRAYSCALE OR COLOR IMAGES) IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND:YES NO III IIIlllllll II RESCANNEDBY; BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: Is~ General Notes or Comments about this file: Quality Checked (do.el STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Repair Well 0 Pull Tubing D Operat. ShutdownD : : ¡ I" : Abandon D Alter Casing D Change Approved Program D 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: P. O. Box 100360, Anchorage, Alaska 7. KB Elevation (ft): RKB 36',61' Pad 8. Property Designation: ADL 25640, ALK 2571 1. Operations Performed: Plug Perforations D Perforate New Pool D Perforate D 4. Current Well Status: Development - 0 Stratigraphic D Stimulate D Waiver D D Time Extension D Re-enter Suspended Well D 5. Permit to Drill Number: Other Exploratory D Service D 183-148/304-253 6. API Number: 50-029-21024-00 9. Well Name and Number: 1 G-15 10. Field/Pool(s): Kuparuk River Field I Kuparuk Oil Pool 11. Present Well Condition Summary: Total Depth Effective Depth Casing Structural CONDUCTOR SURF. CASING PROD. CASING CSG WINDOW Perforation depth: measured 7533' feet true vertical 6963' feet measured 7237' feet true vertical feet Length Size MD 80' 16" 114' 2164' 10-3/4" 2202' 7466' 7" 7502' Plugs (measured) Junk (measured) TVD Burst Collapse 114' 2200' 6936' Measured depth: 6834'-6838', 6843'-6880', 6890'-6895', 6954'-7007', 7193'-7230' true vertical depth: 6366'-6369',6373'-6405',6414'-6418', 6468'-6513', 6671'-6703' Tubing (size, grade, and measured depth) 4.5" 1 3-1/2" , L-80 1 J-55, 6524' I 7116' MD. Packers & SSSV (type & measured depth) pkr= Baker pkr, BAKER FHL RETRIEVABLE PACKER: OTIS 'RRH': OTIS 'WD' pkr=5671'. 6558'; 6670': 7085' nipple - 496' 12. Stimulation or cement squeeze summary: Intervals treated (measured) n/a n/a 13. Treatment descriptions including volumes used and final pressure: Representative Daily Average Production or Injection Data Gas-Me! Water-Bbl 1769 5269 2306 7146 15. Well Class after proposed work: Exploratory D Development 0 16. Well Status after proposed work: oil0 GasD WAGD GINJD WINJ D 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A If C.O. Exempt: Prior to well operation Subsequent to operation 14. Attachments Copies of Logs and Surveys run- Daily Report of Well Operations _X Form 10-404 Revised 04/2004 Contact Printed Name Signature Oll-Bbl 813 2412 Caslnq Pressure Tubmq Pressure 216 233 Service D Abandoned D WDSPL D Aras Worthington @ 265-6802 2Z7/ , Title Phone Wells Group Engine~::,.""~t¿1.;,~2L'2 AUG Q~, 2~U~ Submit Original Only O~¡GINAL AIfJItfi 1Bf,L Page 1 of 3 ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 G-15 Common Well Name: 1 G-15 Event Name: WORKOVER/RECOMP Contractor Name: Nordic Calista Services Rig Name: Nordic 2 Date From - To Hours Code Sub Phase Code 6/30/2004 00:00 - 03:00 3.00 MOVE RURD MOVE 03:00 - 04:30 1.50 MOVE RURD MOVE 04:30 - 10:30 6.00 MOVE MOVE MOVE 10:30 - 22:00 11.50 MOVE RURD RIGUP 22:00 - 00:00 2.00 WELCTL KILL WRKOVR 7/1/2004 00:00 - 02:00 2.00 WELCTL KILL WRKOVR 02:00 - 05:30 3.50 WELCTL KILL WRKOVR 05:30 - 10:00 4.50 WELCTL OBSV WRKOVR 10:00 - 11 :00 1.00 WELCTL COND WRKOVR 11 :00 - 14:00 3.00 WELCTL KILL WRKOVR 14:00 - 14:30 0.50 WELCTL OBSV WRKOVR 14:30 - 17:00 2.50 WELCTL NUND WRKOVR 17:00 - 00:00 7.00 WELCTL NUND WRKOVR 7/2/2004 00:00 - 01 :30 1.50 WELCTL NUND WRKOVR 01 :30 - 03:30 2.00 WELCTL BOPE WRKOVR 03:30 - 06:00 2.50 WELCTL EQRP WRKOVR 06:00 - 09:00 3.00 WELCTL CIRC WRKOVR 09:00 - 09:30 0.50 WELCTL NUND WRKOVR 09:30 - 12:00 2.50 WELCTL OBSV WRKOVR 12:00 - 13:00 1.00 WELCTL OBSV WRKOVR I 13:00 - 13:30 0.50 WELCTL SFTY WRKOVR 13:30 - 15:00 1.50 WELCTL CIRC WRKOVR 15:00 - 17:00 2.00 WELCTL NUND WRKOVR 17:00 - 00:00 7.00 WELCTL CIRC WRKOVR 7/3/2004 00:00 - 01 :30 1.50' WELCTL NUND WRKOVR 01 :30 - 05:00 3.50 CMPL TN PULD WRKOVR 05:00 - 06:30 1.50 WELLSR PLGM WRKOVR Start: 6/30/2004 Rig Release: 7 n /2004 Rig Number: Spud Date: 10/21/1983 End: Group: Description of Operations Disconnect electric lines, move pits, pipe shed ready to move. Scope down and lower derrick. Lower Carrier, move off well ready to move. Move rig from 3H pad to 1 G pad, stopping at Y on Spine Road for crew changes. Set. level and hook up Camp. Pulled VR plug. Line up rig and began setting matten boards and containment MIRU rig. Notify AOGC @ 19:00 of upcoming BOP Test in A.M. Conduct pre-spud safety meeting. Rig accepted 6/30/04 @ 22:00. Begin filling pits, rigging lines up for well kill. Finish rigging for well kill, pull BPV Begin bullheading down IA w/ seawater at 5 bpm. Pump 1.5X over, swap to tbg displace w/ same. InitiallA pressure=840 psi, tbg=580 psi. Begin circulating at 4.5 bpm. Shut down and monitor well. Shut in against choke HCR, initial shut in press. 90 psi annulus 70 psi tubing. Max pressure during shut in 230 psi ann. 100 psi tubing. Weight up brine to 8.9 ppg. Begin bull heading down tubing w/8.9 ppg brine. Pumped 75 bbls. 3 BPM @ 270 psi. Opened annulus circulated 200 bbls around, at 4.7 BPM w/400 psi, returns showing some oil no gas. Shut down monitor well. dead. Set BPV, ND tree, installed Cameron Plug off tool. Begin nippling up for BOP test: test alarm systems in interim. Note: Contacted AOGC at 22:00--BOP test witnessing waived by John Spaulding. Cont. rigging up for BOP test Start BOP test- 250/4000 psi. 3500 psi annular. Finished wI BOP test-good. IA reading 125 psi-- bleed for 10 mins, no change. Pull Plug-off tool from BPV. Check annulus press 100 psi. Pump down tubing w/8.9 ppg brine 200 psi on annulus. circulate out to open top tank, gas & oil. Pumped 140 bbls. shut in w/O psi. Confirmed well dead. Pulled BPV. M/U landing jt w/head pin. Monitor well, 0 tubing 0 psi annulus. Ready for wire line to rig up and set plug in X nipple. Mix sea water and wt up to 8.9 ppg. 266 bbls. While waiting on slickline to rig up took a kick. Closed blind rams, monitor press. 370 psi max on tubing, annulus O. PJSM on killing well. Started pumping 8.9 ppg brine @ 1 BPM, no press on ann. & no returns. Continue pumping and increase rate to 3 BPM no returns and 0 press on ann. Total pumped 96 bbls. Shut in well & monitor press 0 psi. Opened up blinds rams and monitor for flow, no flow. Installed landing jt w/full opening TIW valve, rig up slick line lubricator & BOP. RIH with slickline set 2.81 XX plug in X Nipple at 6597'. Circulated gas/crude from tbg/annulus, PlT'd plug to 1500 psi--good. BOLDS. Rig up Haliburton spooler.Unsting from PBR at 75K#. Pull hanger to the floor, break out. Begin prepping to pull tubing. Begin pulling completion string and laying down tubing, spooling up control line. Layed down SSSV. RIH with storm packer and set at 60'. Test to 1000 psi. PrInted" 7.128'2004 9 J3 40 AM Page 2 of 3 ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 G-15 Common Well Name: 1 G-15 Event Name: WORKOVER/RECOMP Contractor Name: Nordic Calista Services Rig Name: Nordic 2 Date From - To Hours Code Sub Phase Code 7/3/2004 06:30 - 08:00 1.50 WELLSR NUND WRKOVR 08:00 - 13:00 5.00 WELCTL OBSV WRKOVR 13:00 - 19:00 6.00 WELLSR NUND WRKOVR 19:00 - 00:00 5.00 WELLSR NUND WRKOVR 7/4/2004 00:00 - 04:00 4.00 WELCTL NUND WRKOVR 04:00 - 06:00 2.00 CMPL TN PULD WRKOVR 06:00 - 15:30 9.50 CMPL TN PULD WRKOVR 15:30 - 18:00 2.50 CMPL TN PULD WRKOVR 18:00 - 00:00 6.00 CMPL TN RUNT WRKOVR 7/5/2004 00:00 - 05:00 5.00 CMPL TN RUNT CMPL TN 05:00 - 07:00 2.00 CMPL TN CIRC CMPL TN 07:00 - 07:30 0.50 CMPL TN OBSV CMPL TN 07:30 - 10:00 2.50 CMPL TN SOHO CMPL TN 10:00 - 14:00 4.00 CMPL TN DEOT CMPL TN 14:00 - 14:30 0.50 CMPL TN PULD CMPL TN 14:30 - 17:00 2.50 CMPLTN CIRC CMPL TN ¡ 17:00 - 00:00 7.00 CMPL TN TRIP CMPL TN 7/6/2004 00:00 - 04:30 4.50 CMPLTNTRIP WRKOVR 04:30 - 06:00 1.50 CMPL TN DEOT WRKOVR 06:00 - 10:30 4.50 CMPL TN DEOT WRKOVR 10:30 - 16:00 5.50 CMPL TN DEOT WRKOVR 16:00 - 21 :30 5.50 CMPL TN TRIP WRKOVR 21 :30 - 21 :45 0.25 CMPL TN RURD WRKOVR Start: 6/30/2004 Rig Release: 7 n /2004 Rig Number: Spud Date: 10/21/1983 End: Group: Description of Operations NID BOPs to change out tubing spool & packoff. Bleed off pressure on OA. Pump 1/2 bbl water and bled gas off to bleed tank. Attempted to back off bolts on tubing spool and casing expanded 6". Continued to NID, took spool off. Replaced packoff and attempted to push hanger back down with weight of BOP stack. Able to push casing back in place using BOP stack for wgt. bolts to "cinch" it down. RILDS, NU new tbg head. Test packoff to 3000 psingood. Begin NU BOP stack back up. Body test BOP stack to 4k. Prep to pull storm packer. Pull storm packer; begin trip out of hole wI old 3-1/2" completion, laying down. Continue POOH laying down all 3-1/2" tubing, pups, and jewelry and inspect for NORM. Clear pipe rack of all 3-1/2" tubing and jewelry. Change out tools on rig floor from 3-1/2" to 4-1/2". Change pipe rams from 3-1/2" to 4-1/2". Re-test to 4000 psi.Prepare to run new completion. Run new completion per Driller's Tally. Continue running new 4-1/2# completion. Tagged up with seal assembly. spaced out with 15.35' of pups. Pulled seals up 5' circulated 15 bbls corrosion inhibited brine spotted on bottom in tubing X IA. Let hole equalize. Pump out BOP stack, space out tubing and land tubing hanger. PU wt = 82K Dwn wt.= 65K R/U to test tubing. Test tubing to 2500 psi held for 15 min. (charted). Bled pressure on tubing down to 1500 psi. & aUempted to pressure test annulus would not hold. Pumped tubing up to 2500 psi attempted to press up on annulus again, would not hold and could pump into it at 1 BPM @ 2400 psi. Pull hanger & R/U to POOH wI completion. Hole out of balance running over top of pipe. Circulated one hole volume of 8.9 brine around. Well is static. POOH with 4-1/2" completion. Install wear ring. Began tripping back in hole wI test packer. at 4000'. Make initial set wI test packer at 4050'; press up tbg to 2500 psi; injecting at 1.0 bpm, 2400 psi. Swap around to IA. Pump up to 2560 psi, watched for 10 mins--held light. Bleed off. Prep to run in hole to top of packer and retest. RIH with tubing and test packer and set at 6505'. Press up on tubing side to 2500 psi held solid for 5 min. Bled press off. Closed bag and press up on annulus side to 2500 psi bled off to 1600 psi in 5 min. Press back up to 2400 psi and pumping into it at 1/2 BPM. Bleed press off. Pull up hole to 6355'. Press up on ann. to 2500 psi bled off same. Pull up to 5857 test same leaked off same. Pull up to 5362 press up to 2500 held good for 10 min. Bled off press and lowered packer back down to 5795' press up again and leaked off. Picked up one stand to 5735' press up to 2500 held OK. Casing leak between 5735' and 5795'. RID testing equip. Release test packer and POOH f/5734. On surface with test packer. Removed Wear Ring. Pr,nlE-d 7/2Bi20QJ. 9:J.3 40 AM Page 3 of 3 ConocoPhillips Alaska Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 1 G-15 1 G-15 WORKOVER/RECOMP Nordic Calista Services Nordic 2 Date From - To Hours Code Sub Phase Code 7/6/2004 21 :45 - 22:00 0.25 CMPL TN SFTY WRKOVR 22:00 - 22:30 0.50 CMPL TN PULD WRKOVR 22:30 - 00:00 1.50 CMPL TN RUNT WRKOVR 71712004 7.00 CMPL TN RUNT WRKOVR 00:00 - 07:00 07:00 - 07:30 0.50 CMPL TN RUNT WRKOVR 07:30 - 09:30 2.00 CMPL TN CIRC WRKOVR 09:30 - 10:00 0.50 CMPL TN RUNT WRKOVR 10:00 - 11 :00 1.00 CMPL TN PCKR WRKOVR 11 :00 - 12:30 1.50 CMPL TN SEaT WRKOVR 12:30 - 16:00 16:00 - 20:00 3.50 CMPL TN NUND WRKOVR 4.00 CMPL TN SEaT' WRKOVR Start: 6/30/2004 Rig Release: 7n/2004 Rig Number: Spud Date: 10/21/1983 End: Group: Description of Operations Held Pre-Job safet meeting. Prepped floor for trip in with the completion. Picked up new seal assy. Organized completion equipment in the pipe shed. Started running new completion on 4-1/2" 12.6# 1-80 IBTM.Drifted the seal assy and the x-over to 2.867". Drifting all 4-1/2" tbg & jewelry to 3.833". Installing new seal rings @ each stand connection and using Jet Lube run-n-seal dope. Started running new completion on 4-1/2" 12.6# 1-80 IBTM.Drifting all 4-1/2" tbg & jewelry to 3.833". Installing new seal rings @ each stand connection and using Jet Lube run-n-seal dope. All Tbg above the 3.813" DB-6 nipple rabbited to 3.853" Sting seal assembly into PBR while pumping, press increased when seals entered PBR. Picked back up and spaced out Pumped 120 bbls of corrosion inhibited displaced up backside with 97 bbls. of 8.9 brine, pumping 2 BPM @ 70 psi. Pull out jt 204 & 203. Install 4 pups for space out and run jt 203 back. MU tubing hanger and land. RILDS. Drop ball & rod, wait 45 min. Press up on tubing to 4350 psi to set Premier Packer @ 5670'. Beginning press. 4350 Ending press 4250, Held press for 15 min on chart for tbg test. Bled back to 1500 psi. Press up on annulus to 2600 psi beginning press held for 15 min on chart, ending press 2600 Bled press from tubing to 0 psi and sheared dump kill valve in GLM 1t2 just above packer. Bled both sides down to O. ND test equipment. Pull landing jt. Install 2-way check. ND stack. NU tree and test to 250/5000 psi. Removed 2-way check and installed BPV. Released Rig @ 20:00. Begin Rig down for move. Pr,nlM 7/28'2004 9 J3:4Q AM 1. Type of Request: Abandon ,I' ¡{. .,., 1...-,' k \ ".,¡.:~u:~, I ~rnlll. ,.J'I,~ll,~ ~.." "~, :r:.:....... , STATE OF ALASKA r-{ t: (ß E:.', ~ \/E'. [".J '1~ ALASKA OIL AND GAS CONSERVATION COMMISSION !J ~ ~ APPLICATION FOR SUNDRY APPROVAL JUL \) íj LOO4>~ . 20 AAC 25.280 'VI I,' "', 1"'ìI1" ç'¡1r:¡.:':::s>:,K "\1. .'., . 1,\\ I" ,,-., D Suspend D Operation Shutdown D Perforate D I ',,' v:,~ixe( ..: ... [] i~, Annular Disp. D D Repair well D Plug Perforations D Stimulate D Time Ext~nsion d Other D 0 Pull Tubing D Perforate New Pool D Re-enter Suspended Well D Alter casing Change approved program 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: P. O. Box 100360, Anchorage, Alaska 7. KB Elevation (ft): RKB 36',61' Pad 4. Current Well Class: Development - 0 Stratigraphic D Exploratory D Service D 5. Permit to Drill ~ber: 183-148 6. API Number: 50-029-21024-00 ./ 8. Property Designation: ADL 25640, ALK 2571 11. Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): 7533' 6963' 7237' Casing Length Size 9. Well Name and Number: 1 G-15 10. Field/Pool(s): Kuparuk River Field 1 Kuparuk Oil Pool PRESENT WELL CONDITION SUMMARY Effective Depth TVD (ft): Plugs (measured): Junk (measured): PROD. CASING 7466' 7" MD TVD Burst Collapse 114' 114' 2202' 2200' 7502' 6936' CONDUCTOR SURF. CASING 80' 2164' 16" 10-3/4" Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: 3-1/2" Tubing Grade: J-55 Tubing MD (ft): 7120' 6834'-6838', 6843'-6880', 6890'-6895', 6954'-7007', 7193'-7230' 6366'-6369', 6373'-6405', 6414'-6418', 6468'-6513', 6671'-6703' Packers and SSSV Type: Packers and SSSV MD (ft) pkr= BAKER FHL RETRIEVABLE PACKER; OTIS 'RRH'; OTIS 'WD' pkr= 6558'; 6670'; 7085' SSSV= SSSV SSSV= 1805' 12. Attachments: Description Summary of Proposal 0 Detailed Operations Program D BOP Sketch D 14. Estimated Date for Commencing Operations: 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name .Þ!Y' WO~hinqto ." Signature Æ 4.. Commission Use Only July 6, 2004 Date: 13. Well Class after proposed work: Exploratory D Development 0 15. Well Status after proposed work: Oil 0 GasD WAG D GINJ D Service D Plugged D WINJ D Abandoned D WDSPL D Contact: Title: Aras Worthington @ 265-6802 Wells Group Engineer Phone ;ZÇÇG8ctL Date 7fi/Þor Sundry Number: J53 ~ 3o'f"~ ...... .\)Rs.~\fc Plug Integrity D BOP Test D M~~y Teste.:., ~ Location Clearance D Other: +~~'\"~'* :r. ~ ~~~~~\(è, ~\. ~~~ \~~ ~"o~\cl Ð~ s0b~\ \-\~ Conditions of approval: Notify Commission so that a representative may witness Subsequent F orm Required: '-\ \) '-\ APprovedb~ ~ ~ 0 ~~M~S~~~ L _8fl. B.08 .- Date: 7/t1 ç BY ORDER OF THE COMMISSION Form 1 0-403 Revised 12/2003 INSTRUCTIONS ON REVERSE Submit in Duplicate TUBING (0-7120, 00:3.500. 10:2.992) ( ( ConocoPhillips Alaska, Inc. 1 G-15 - I-tt API: 500292102400 SSSV Type: LOCKED OUT Well Type: PROD Orig 10/29/1983 Completion: Last W/O: 8/10/1998 KRU 1G-15 Angle (â:J TS: 31 deg (â:J 6830 Angle @ TD: 31 deg @ 7533 Rev Reason: Lock Out TRDP, GL V design Last Update: 7/2/2004 Type Comment IPERF 120 deg Phasing; 5" DA IPERF 120 deg Phasing; 5" DA IPERF 120 deg Phasing; 5" DA IPERF 120 deg Phasing; 5" DA APERF 90 deg Phasing; 2 1/16" RigidJet Gas. Lift MandrelsNalves St MD TVD Man Man Type V Mfr V Type VOD Latch Port TRO Mfr 1 1978 1978 CAMCO KBUG CAMCO DMY 1.0 BK 0.000 0 2 3216 3216 CAMCO KBUG CAMCO DMY 1.0 BK 0.000 0 3 4074 4067 CAMCO KBUG CAMCO DMY 1,0 BK 0,000 0 4 4679 4596 CAMCO KBUG CAMCO DMY 1.0 BK 0.000 0 5 5191 5004 CAMCO KBUG CAMCO DMY 1.0 BK 0.000 0 6 6490 6069 CAMCO MMG CAMCO OPEN 1.5 RK 0.000 0 Production MandrelsNalves St' MD TVD Man Man Type V Mfr V Type VOD Latch Port TRO Mfr 9 6707 6256 Otis SPM MACCO HFCV 1.0 BEK 0,000 0 10 6777 6317 Otis SPM MACCO HFCV 1.0 BEK 0.000 0 11 7045 6545 Otis SPM MACCO HFCV 1.0 BEK 0.000 0 Overshot 1. OPEN; MAGGO Slotted DPHF (6630-6632, 2. OPEN; MAGGO Slotted DPHF 00:5.990) 3. OPEN; MAGGO Slotted DPHF STUB Other(plugs,equip." etc. ),-J,EWELRY (6632-6644, Depth TVD Type Description 00:3.500) 1805 1805 SSSV Camco TRDP-4E (LOCKED OUT 6/25/2004) 6542 6114 PBR BAKER 80-40 6558 6128 PKR BAKER FHL RETRIEVABLE PACKER 6597 6162 NIP Otis 'X' Landing Nipple selective profile (set 8/10/99) 6630 6190 Overshot OVERSHOT, NO SEALS, MAX OD 5.99" set 8/10/1998 6632 6192 STUB 16.3' TUBING STUB SET 8/10/1998 6644 6202 SBR 7" OTIS SBR 2/2.813 X-PROFILE set 8/10/1998 6670 6224 PACKER OTIS 'RRH' PACKER set 8/10/1998 7085 6579 PKR Otis 'WD' 7105 6596 NIP Camco 'D' Nipple NO GO 7115 6605 SOS Otis 7116 6606 TTL General Nötes Date I Note 3/10/1998 Ran KINLEY Caliper Log from 6444' RKB to Surface on 3/10/98 11/8/1998 ORIGINAL COMPLETION BELOW 6630' ... I Reference Log: Last Tag: 7237 Last Tag Date: 1/13/2004 Casing String - ALL STRINGS Description Size Top Bottom TVD Wt Grade Thread PROD. CASING 7.000 0 7502 6936 26.00 J-55 SURF. CASING 10.750 0 2202 2202 40.00 J-55 CONDUCTOR 16.000 0 114 114 63.00 H-40 Tubing String - TUBING (TUbin¡ actually from 1998, backdated for schematic view to show GLVs) Size I Top Bottom I TVD I Wt I Grade I Thread 3.500 0 7120 6609 9.30 J-55 8RD EUE Perforations Summary Interval TVD 6834 - 6838 6366 - 6369 6843 - 6880 6373 - 6405 6890 - 6895 6414 - 6418 6954 - 7007 6468 - 6513 7193 - 7230 6671 - 6703 Annular Fluid: Ref Log Date: TD: 7533 ftKB Max Hole Angle: 38 deg (â:J 5350 Zone C-4 C-4 C-3 C-1 A-5,A-4,A-3 Status Ft SPF 4 12 37 12 5 12 53 12 37 8 Date 1/31/1984 1/31/1984 1/31/1984 1/31/1984 5/23/1984 Date Vlv Run Cmnt 6/25/2004 6/25/2004 8/10/1998 8/10/1998 8/10/1998 6/25/2004 - Date Vlv Run Cmnt 1/14/2004 (1) 1/15/2004 (2) 1/16/2004 (3) ID 2.812 2.813 2.969 2.813 2.930 2.992 2.813 2.970 4.000 2.750 2.984 2.984 .. j( 1G-15 Procedure A rig workover is in progress on 1 G-15 to upsize the tbg from 3 %" to 4 %" for increased flow rate. . (", \ bV ~ <! d- 4c) 0 \'<> \ ,-, ~\ '\ \ \ w\-\~\N.. In the course of the workover a 7" casing leak was found between 5360' & 5860" \tJk~ ~ \.. '\<;; MD. ~ CòSS~ il ConocoPhillips Alaska Inc. proposes that we sting into the existing packer with 4 %" tbg, run tbg up to a second packer set @ - 5300' to isolate the casing leak "straddling" it with the packers/tbg. S.-\\<;ð~ \~s ~-"')<è b!êe., Æ:..M\,\'ö'~-\'ô ì sù \~-\€: <:'QS\I'-~ ~CAUV\G-~Q: J \~ ~"'). ~, Jì<Á~~ ~ +-~ \(ëQ\L \ ~\~SS\.)'\<'c CO-.V't-,o~- bÇ. \-~pp::Ç) ,,,.\-k ~\ \ ~'ð ,£j I" ~\'.JCl \ . '_'rcl;Cö 1"",-~.sJØ-P~~~\~ c..\>~"l's~~~ Æ-1r11~ ÞE ..., ! '1 /to -0 L; STATE OF ALASKA ,.-~,.. AL/" .A OIL AND GAS CONSERVATION CC .JIISSION APPLICATION FOR SUNDRY APPROVAL Plugged back for CT 1 Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate · [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 78' SNL, 1789' WEL, SEC. 19, T11N, R13E, UPM At top of productive interval 1061' SNL, 867' EWL, SEC. 20, T11N, R13E, UPM At effective depth 1115' SNL, 926' EWL, SEC. 20, T11N, R13E, UPM At total depth 1162' SNL, 986' EWL, SEC. 20, T11N, R13E, UPM Type of well: Development [] Service Exploratory Stratigraphic (top Sag R.) 6. Datum Elevation (DF or KB) KBE = 84.64 AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number U-08 9. Permit Number 84-102 10. APl Number 50- 029-21136 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9960 feet Plugs (measured) BKB 9243 feet 9708 feet Junk (measured) BKB 9004 feet Bridge plug @ 9708' MD (07/90) Casing Length Size Cemented MD TVD Structural Conductor 110 20x30 8 c.y. 144 144 Surface 2665 13-3/8" 3720 c.f. 2699 2699 Intermediate 9392 9-5/8" 2290 c.f. 9426 8734 Production Liner 777 7" 275 c.f. 9163-9940 8485-9224 Perforation depth: measured 9442'- 9476' (Sag R) 9567'-9597', 9607'-9650', 9660'-9710', 9720'-9755' (Ivishak) truevertica, subsea 8665'-8698' (Sag R). 8784'-8963' (fourlvishak intervals) ~'CEIVE[ Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9088' with 4 1/2" tailpipe to 9196' OCT 0 2 1998 Packers and SSSV (type and measured depth) 9 5/8" BOT packer at 9088'; 4 1/2" SSSV at 2010' 13. Attachments []Description summary of proposal []Detailed operations program [--JBOP sketch ~~ ' 14. Estimated date for commencing operation 10/12/98 Date appr°vedi 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Ted Stagg 564-4694 15. Status of well classifications as: [] Oil [~ Gas [] Suspended Service Prepared By Name/Number: Theresa Mills 564-5894 !17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Ted Staqq Title Coiled Tubing Drilling Engineer Commission Use Only Date Conditions of Approval: Notify Commission so representative may witness Plug integrity )(. BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form requir~ 10- ~:5)7 Approved by order of the Commission n,,.,i . ~"'i'~ ' '~' ~~ Form 10-403 Rev. 06/15/88 uc~v,d W Johnston ,.o¢ ommissioner I Approval No.~' Submit In Triplicate TREE: 4" CIW WELLHEAD: McEVOY ACTUATOR: OTIS ~'%08a Proposed Completion KB. ELEV = 84.64' BF. ELEV = 49.94' SSSV LANDING NIPPLE I ( OTIS"DBE")(3.813"1D) 2011' 13 3/8", 72 CC/fi, 2699' L-80, BTRS KOP: 2700' MAX ANGLE: 39° @ 6450' 4 1/2", 12.6:dC/ft, L-80, NB MOD BTRS TUBING (IPC) TUBING ID: 3.958" CAPACITY: .0152 BBL/FT GAS LIFT MANDRELS fOTIS W/RA LATCH~ N° MD(BKB) TVDss 6 3273' 3265' 5 5152' 4971' 4 7042' 6571' 3 7603' 7057' 2 8337' 7720' 1 8855' 8196' SLIDING SLEEVE (OTIS"XA") (3.813" ID) I 9003' I TOP OF 7" LINER !9163' I~ 9 5/8", 47CC/ft, L-80, BTRS I9426' I-- SEALBORE RECEP. I 9064' "X" PROFILE3.813"ID I 9 5/8" BOT PACKER (3H)(3.958"ID) ] 9088' 4 1/2" 12.6~/FT L-80 TAILPIPE 4 1/2 .... X" NIPPLE J 9131' ( OTIS ) ( 3.813" ID) I 4 1/2 .... XN" NIPPLE I 9163' ( OTIS ) ( 3.725" ID) 4 1/2" TBG TAIL j 9196' (BOT SOS) (4.00 "ID) (ELMD)i 9192' 2 7/8" Cemented Liner Whipstock -- Ivishak Abandonment Cement PERFORATION SUMMARY REF. LOG: GEARHART- BHCS TIE IN LOG: GEARHART - CBL SIZE SPF INTERVAL 3 3/8" 6 3 1/8" 4 3 1/8" 4 31/8" 4 31/8" 4 7-24-84 7-27-84 9442- 9476' 9567-9597' 9607-9650' 9660-9710' 9720-9755' !OPEN/SQZ'D OPEN/4-7-89 OPEN/8-02-85 OPEN/8-02-85 OPEN/8-02-85 OPEN/8-02-85 Sag R. perfs PBTD ~ 7", 29 CC/fi, L-80, BTRS ! 9940' I BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: Oct. 2, 1998 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Blair Wondzell Sr. Reservoir Engineer Re: Well U-08 Prep for CT Sidetrack Well U-08 is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prepare U-08 for sidetracking and is submitted as an attachment to Form 10-403. Schematic diagrams of the proposed cement squeeze and sidetrack completion are attached. 1. A tubing integrity test has been successfully performed. 2. Tubing and liner have been drifted with a 3.65" OD drift. 3. Kinley caliper has been run over the proposed whipstock interval to confirm tubing condition. 4. A mechanical whipstock will be set on e-line at 9,532', approx. 35 ft above the uppermost Zone 4 perforations. 5. Service coil will be used to downsqueeze cement to abandon existing lvishak perforations below the whipstock depth. Approx. 20 bbls cement will be used. Existing Sag R. perfs above the whipstock depth will be cement squeezed during the Ivishak perf abandonment. These Sag R. perfs will then be completely covered by the 2 7/8" cemented liner when the U-08a sidetrack is completed. A 1500 psi pressure test will be performed with AOGCC witness prior to milling the window. 6. Window milling will be done by drilling coil after approval of the Form 10-401. Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center RECEIVED oCT O 2 199tl Alaska 0il & Gas Cons. Commi~ll~f~ Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown Pull tubing, X Stimulate__ Plugging__ Alter casing __ Repair well __ Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 309' FSL, 441' FWL, Sec. 29, T12N, R10E, UM At top of productive interval 966' FSL, 925' FEL, Sec. 30, T12N, R10E, UM At effective depth At total depth 1144' FSL, 1243' FEL, Sec. 30, T12N, R10E, UM 12. Present well condition summary 5. Type of Well: Development X Exploratory __ Stratigraphic _ Service _ 6. Datum elevation (DF or KB) RKB 36', 61' Pad 7. Unit or Property name Kuparuk River Unit 8. Well number 1G-15 9. Permit number/approval number 83-148/398-190 10. APl number 50-029-21024 11. Field/Pool KuDaruk River feet Total Depth: measured 7533' true vertical 6963' feet feet Plugs (measured) Effective depth: measured 7419' true vertical 6865' feet feet Junk (measured) Casing Length Size Structural Conductor 78' 16" Surface 2164' 10.75" Intermediate Production 7466' 7" Liner Cemented Measured depth True vertical depth 212 SX CS II 114' 114' 1100 sx PF E & 2200' 2200' 250 sx PFC 750 sx Class G & 7502' 6936' 250 sx PFC Perforation depth: measured 6834'-6838', 6843'-6880',6890'-6895', 6954'-7007',7193'-7230' true vertical 6365'-6369', 6373'-6405', 6413'-6418', 6468'-6513', 6671'-6703' Tubing (size, grade, and measured depth) 3.5', 9.3#, L-80 @ 6637', 3.5", 9.3#, J-55 @ 7120' Packers and SSSV (type and measured depth) Baker 'FHL' retr.pkr @ 6558', Otis RRH pkr @ 6674', Otis WD pkr @ 7090' Camco 'TRDP-4E' SSSV @ 1805' I::: (' I:: I I:: 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINAL 14. Representative Daily Average Production or Injection Data !~ L- ~.. I. I V I.i i/ SEP 15 1998 Alaska 0il & Gas Cons. Commission Anch0r~,ge Pdor to well operation Subsequent to operation OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations X 16. Status of well classification as: Water Injector__ Oil X Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed , ,/~-~_.,¢ ,~ ~~/¢¢'.,,--""-'~~"-Tit'e Kuparuk Drilling Engineer Form 10-~'4'~e~05/17/89 Date SUBMIT'IN DUPUCATE Date: 8/19/98 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 1 REMEDIAL AND COMPLETION OPERATIONS WELL:iG-15 WELL_ID: 999226 TYPE: AFC: 999226 STATE:ALASKA AREA/CNTY: NORTH SLOPE EAST FIELD: KUPARUK RIVER UNIT SPUD: START COMP:08/06/98 RIG:NORDIC # 2 BLOCK: FINAL: WI: 0% SECURITY:0 API NUMBER: 50-029-21024-00 08/06/98 (Cl) TD: 7419' PB: 7502' 08/07/98 (C2) TD: 7419' PB: 7502' 08/08/98 (C3) TD: 7419' PB: 7502' 08/09/98 (C4) TD: 7419' PB: 7502' 08/10/98 (C5) TD: 7419' PB: 7502' 08/11/98 (C6) TD: 7419' PB: 7502' 08/12/98 (C7) TD: 7419' PB: 7502' LOAL 11" 5M DOUBLE GATE B MW: 0.0 DOIL SUPV:DONALD L. WESTER Turn key rig move from 3A to 1G, 11 miles. Road from spine to 1G pad rutted deep. Rig on location @ midnight. PULL & L/D3.5" TUBING 56 MW:10.8 BRINE SUPV:DONALD L. WESTER Pump seawater to kill well. N/D tree and N/U BOPE and function test to 250/3500 psi, OK. RIH W/ POLISH MILL & CSG MW:10.8 BRINE SUPV:DONALD L. WESTER Pull 3.5" tubing. Top of tubing cut 6627'. Cut off rough due banging into stub. RIH with polish mill. L/D 3.5" DP MW:10.8 BRINE SUPV:DONALD L. WESTER Continue to RIH w/inside/outside polish mill to 6600'. Set 7" storm packer 40' below rotary. Mill @ 6420'. N/D BOPE. Install 7" packoff and tubing head. N/U BOPE and function test to 250/3500 psi. Pull storm packer. CONTINUE RUNNING 3.5" COM SUPV:DONALD L. WESTER RIH w/3.5" completion. MW:10.8 BRINE MOVE RIG FROM 1G-15 TO 2C MW:10.8 BRINE SUPV:RICK OVERSTREET Run 3.5" completion. RIH w/swedge. Could not get through top no-go profile at 1805' N/D BOPE, NU tree and test to 250/5000 psi. Freeze protect well. Move off well. MOVE MW: 0.0 BRINE SUPV:RICK OVERSTREET Move off well, secure well. Clean pits. Pull BOPE stack out of rig for moving. Release rig @ 0130 hrs. 8/12/98 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Alter casing __ Repair well _ Change approved program __ Operation Shutdown __ Re-enter suspended well __ Plugging__ Time extension_ Stimulate_ Pull tubing X Variance__ Perforate__ Other__ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 309' FSL, 441' FWL, Sec. 29, T12N, R10E, UM At top of productive interval 966' FSL, 925' FEL, Sec. 30, T12N, R10E, UM At effective depth At total depth 1144' FSL, 1243' FEL, Sec. 30, T12N, R10E, UM 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 6. Datum elevation (DF or KB) 36' RKB, 61' Pad elevation 7. Unit or Property name Kuparuk River Unit 8. Well number 1G-15 9. Permitnumber 83-148 10. APInumber 50-029-21024 11. Field/Pool Kuparuk River feet 12. Present well condition summary Total Depth: measured 7533' (approx) true vertical 6963' Effective depth: measured 7419' (approx) true vertical 6865' Casing Length Size Structural Conductor 78' 16" Surface 2164' 10.75" Intermediate Production 7466' 7" Liner feet feet feet feet Plugs (measured) None Junk(measured) ORIGINAL Cemented Measured depth True vertical depth 212 sx CS II 114' 114' 1100 sx PF E 2200' 2200' & 250 sx PFC 750sx Class G & 7502' 6936' 250 sx PFC Perforation depth: measured 6834'-6838', 6843'-6880', 6890'-6895', 6954'-7007', 7193'-7230' true vertical 6365'-6369', 6373'-6405', 6413'-6418', 6468'-6513', 6671'-6703' Tubing (size, grade, and measured depth) 3.5", 9.3#, J-55 @ 7116' Packers and SSSV (type and measured depth) Otis RRH Pkr @ 6670' MD and Otis WD Pkr @ 7086' MD, Camco TRDP-1A SSSV @ 1893' RECEIVED JUL 14 1998 Naska 011 & Gas Cons. Commission Anchorage 13. Attachments Description summary of proposal X Contact Mark Chambers at 265-1619 with any questions_. Detailed operation program __ BOP sketch _X 14. Estimated date for commencing operation July 1998 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Service Suspended_ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ -~ ~,~ Title Kuparuk Drilling Engineer FOR COMMISSION USE ONLY Date Conditions of approval: Notify Commission so representative may witness Plug integrity_ BOP Test ~ Location clearance Mechanical Integrity Test_ Subsequent form require 10-__~ -- drigina' ~- ~ David W. ,Johnston Approved by the order of the Commission ~mmissioner IApproval No. 3 ?~'-/? I Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE KRU 1G-15 GENERAL WORKOVER PROCEDURE RECEIVED UL ] 1998 PRE-RIG WORK: Alaska Oil & Gas Cons. Commisslo. Anchorage RIH w/wireline. Set PXX (equalizing plug) plug in X-profile of SBR, isolating A and C Sands from main well bore. Pull Dummy Valve from GLM #8 @ 6603' leaving an open pocket. Dummy off all other GLM's. 2. RU E-line unit. Chemical cut tubing in middle of first full joint above SBR @ +/- 6628'. 3. Set BPV in tubing. Install VR plug in annulus valve. GENERAL WORKOVER PROCEDURE: 1. MIRU Nordic Rig. Lay hard-line to tree. Pull BPV and VR plug. Load pits w/seawater. Displace tubing and annulus w/seawater. SI well and determine kill wt fluid required. 2. Load pits w/kill wt brine (expected kill wt - 10.7 ppg). Circulate well to brine. Ensure well is dead. Set BPV. 3. ND tree. NU and test BOPE. Screw in landing joint. POOH to SSSV laying down 3-1/2" tubing. PU Storm Packer and hang-off tubing string immediately below well head. ND BOP stack and tubing head. Change-out 7-5/8" lower packoff and Tubing Head. Test packoff to 3000 psi. NU BOP stack and test broken flange. Pull Storm Packer and verify well is dead. Continue POOH laying down 3-1/2" tubing and jewelry to chemical cut above SBR. PU bit and scraper. RIH clean out well to top of tubing stub. Circulate hole clean. PU Overshot Tubing Guide and RIH with 3-1/2" tubing and completion equipment as required. Wash over tubing stub with overshot, space-out and land completion assembly. RU Slicldine. RIH and set plug in profile. Set Packer and pressure test tubing. 10. ND BOPE. NU and test tree. Freeze protect well with diesel. o . . . o . Lower Limit: 4.0 days Expected Case: 4.5 days Upper Limit: 6.0 days No problems pulling or re-running completion Difficulties encountered pulling completion, or re-running completion MAC 7/6/98 1G-15 Proposed Completion L. 3-1/2" 5M ClW Gen IV tubing hanger with 3-1/2" L-80 EUE 8rd pin down. K. 3-1/2", 9.3#, L-80 EUE 8rd Mod tubing with control line clamps on every other joint to surface. J. 3-1/2" Camco 'TRDP-4E' SSSV with 2.812" No-Go profile, set at +/-1800' MD. 6' L-80 handling pups installed. I. 3-1/2", 9.3#, L-80 EUE 8rd Mod tubing to SSSV w/ 3-1/2" x 1" Camco 'KBUG' mandrels w/ DV's, spaced out as follows: GLM# MD-Original RKB TVD 2 5186' 5000' 3 4673' 4591' 4 4071' 4O64' 5 3194' 3194' 6 1963' 1963' H. 3-1/2" x 1-1/2" Camco 'MMG' mandrel w/DCR-1 dump kill valve & RKP-2 latch (3500 psi casing to tubing shear). 6' L-80 handling pups installed. G. I jt 3-1/2" L-80 EUE 8rd Mod tubing. F. 3-1/2" Baker '80-40' PBR w/10' stroke (32K lb shear). 6' L-80 handling pup installed. E. 3-1/2" x 7" Baker 'FHL' Retrievable Packer. (60K lb shear or rotational release). D. 1 jt 3-1/2" L-80 EUE 8rd Mod tubing C. 3-1/2" Halliburton 'X' landing nipple with 2.813" ID sealbore (selective profile) with RHC plug run in place for setting FHL Packer. B. 1 jt 3-1/2" L-80 EUE 8rd Mod tubing A. Overshot Tubing Guide for 3-1/2" 9.3# tubing in 7" 26# casing. 5.99" max OD, 2.93" min ID. ....... All Items below the Otis SBR barrel are from the original completion of 1-10-84 ...... C Sand Perfs 6834'-6838' 6843'-6880' 6890'-6895' 6954'-7007' A Sand Perfs 7193' - 7230' MAC 7/6/98 STATE OF ALASKA ' A,_,,SKA OILAND GAS CONSERVATION COMM~;=,,51ON REPORT OF SUNDRY WELL OPERATIONS 1. Type of Request: Operation Shutdown m Stimulate __ Plugging Perforate Pull tubing Alter casing Repair well Pull tubing Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 309' FSL, 441' FWL, Sec. 29, T12N, R10E, UM At top of productive interval 966' FSL, 925' FEL, Sec. 30, T12N, R10E, UM At effective depth 1050' FSL, 1210' FEL, Sec. 30, T12N, R10E, UM At total depth 1144' FSL, 1243' FEL, Sec. 30, T12N, R10E, UM 12. Present well condition summary Total Depth: measured true vertical 7533' feet 6 9 63' feet Plugs (measured) 6. Datum elevation (DF or KB) ~)7' RKB 7. Unit or Property name Kuparuk River Unit 8. Well number 1 G-15 Producer 9. Permit number/approval number 85-148/7-548 10. APl number , 50-029-21024 11. Field/Pool Kuparuk River Oil Pool Effective depth: measured 741 9' true vertical 6768' feet feet Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size 114' 16" 220O' 10 3/4" 7502' 7" measured 6836'-7007' true vertical 6360'-6507' Cemented 212 Sx 1100 Sx 750 Tubing (size, grade, and measured depth) 3.5", 9.3#, J-55 @ 1893' Packers and SSSV (type and measured depth) Camco TRDP-1A @ 1893' Otis RRH @ 6670'; Otis WD @ 7085' Measured depth 116' 2200' 7502' True vertical depth 116' 2195' 6930' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 2000 gal 12% HCL 14. Reoresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1374 569 3528 1220 269 Subsequent to operation 1240 713 3672 1216 243 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Water Injector__ Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sicjned /,~/c~ ,~ ~×~t.~.~,//1~ j Title Sr. Operations Engineer Form 1D-4~04 R¢;;~ 05/17"/8"9 Date ~'.'.~/~/~ ~ J SUBMIT IN bUP"LICATE WELL ARCO Alaska, I-~'~' Subsidiary of Atlantic Richfield Comps.. FIELD- DISTRICT- STATE ~,2~4 - AY-. WELL SERVICE REPORT .ZACTOR /..L.i;Sc4~Z.r-o~5 -- ~. REMARKS PBDT '74~9 ' IOPERATxT3~ON AT REPORT TIME [] CHECK THIS BLOCK If SUMMARY CONTINUED ON BACK Weather ITemp' [ Chill Fact°r I Visibility lWind Vel'Report OF °FI miles knots I Signed ARCO Alaska, Inc. Date' July 15, 1988 Transmittal #: 7225 RETURN TO: ARCO Alaska, Inc. Attn: Brenda K. Miernyk Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. ~30-1 5 Kuparuk Fluid Level Report 7- 1 1 - 8 8 · 30-1 0 Kuparuk Fluid Level Report 7- 1 I - 8 8 t 2 D - 1 5 Kuparuk Fluid Level Report 7- 1 2 - 8 8 * 2A- 0 6 Kuparuk Fluid Level Report 7 - 1 2 - 8 8 ,, 1 G-0 7 Kuparuk Fluid Level Report 7 - 0 8 - 8 8 ~. 1 G-0 8 Kuparuk Fluid Level Report 7 - 0 8 -..8 8 ~ 1 G- 1 5 Kuparuk Fluid Level Report 7- 0 8 - 8 8 · 31 - 0 1 Kuparuk Fluid Level Report 7 - 0 8 - 8 8 w 31 - 1 2 Kuparuk Fluid Level Report - 7- 0 8 - 8 8 · 2A-03 Kuparuk Fluid Level Report 7- 0 6 0 8 8 , 3 H - 1 4 . Post Frac Job Report 7 - 0 9 - 8 8 ~ 2 B - 1 6 Bollom Hole Pressure' Survey 7- 0 3 - 8 8 ~ 3 J - 1 0 Kuparuk Well Pressure Report 3 - 0 8 - 8 8 Tubing Tubing Casing Tubing Casing Casing Casing Tubing Tubing Casing AIIo Frac A-10 PBU Amerad Receipt Acknowledged: · - ................... Date: ............ [;)ISTRIBUTION' D&M State of Alaska SAPC Mobil Unocal Chevron ,'- STATE OF ALASKA '- ' ALA,...,A OIL AND GAS CONSERVATION CCI .. ,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate .1~ Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator ARCO Alaska, ]:nc 3. Address PO Box 100360, Anchorage. AK 9951.0 4. Location of well at surface 309' FSL, 441' FWL, Sec 29 T12N, R10E UN At top of proOuctive interval ' ' ' 966' FSL, 925' FEL, Sec. 30, T12N, R10E, UM At effective depth 1050' FSL, 1210' FEL, Sec. 30, T12N, R10E, UM At total depth 1144' FSL, 1243' FEL, Sec.30: T]2N: RIOE. UM 11. Present well condition summary Total depth: 5. Datum elevation (DF or KB) RKB 97 6. Unit or Property name Kuoaruk River Unit 7. Well number 1G-].5 8. Permit number Permit #85-148 9. APl number 50-- 029-21024 10. Pool KuDaruk Rivm. r Oil Pn~l measured 7533' MD feet Plugs (measured) None true vertical 6963' MD feet feet Effective depth: measured 7419' ND feet true vertical feet 6768' ND Junk (measured) None Casing Length Size Cemented Measured depth Structural 114' 16" 212 SX 116' MD Conductor Surface 2200' 10.75" 1100 SX 2200' MD Production 7502' 7" 750 SX 7502' MD xxx~xxxxx Perforation depth: measured 6836'-7007' MD ~ue Vertical depth 116' TVD 2195' TVD 6930' TVD true vertical 6360'-6507' TVD Tubing (size, grade and measured depth) 3.5", 9.3 lb, J-55 @ 1893' MD Packers and SSSV (type and measured depth) Camco TRDP-1A fa lRgg' flti~ P~M _fa ~7n';_ Otis w_n @ 7085' 12.Attachments Description summary of proposal ~ Detailed operations program [] Treat w/2000 qals 12% HC1 to remove scale 13. Estimated date for commencing operation August 20, 1987 5; ,~.~uu i 9 i~87 Alaska 0il & Gas Cons. CommJssio,~ A~ch0rage BOP sketch [] 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the fore, going is true and,,,correct to the best of my knowledge Signed ?J~/ ;~ ~~~r$ Title Sr. Operations Engineer Commission Use Only Date 8/17/87 Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearance[ Approved by . Oommission by order of the commission Date~''''/~"'"/7 Form 10-403 Rev 12-1-85 Submit in triplicate~ ARCO Alaska, Inc. Post Offi~ ~ox 100360 Anchorage. Alaska 99510-0360 Telephone 907 276 1215 DATS: 09-05-85 TRANSMITTAL NO: 5332 RETURN TO: TKANSMITTED RECEIPT AND SEQUENCE OF ARCO ALASKA, INC. KUPARUK_OPERATIONS ENGINEERING RECORDS CLERK ATO- 1115B P.O. 'BOX 100360 ANC~OKAGE, AK 99510 HEREWITtt ARE THE FOLLO~ING ITEMS. RETURN ONE SIGNED COPY OF THIS EVENTS PRESSURE DATA 1H-3-~ PBU 03-07-85 2A-l--- 'C' SAND PBU 08-03-85 2B-l]:,'' 'C' SAND PBU 08-01-85 2C-U 'A' SAND PBU 08-16-85 2V-2 - 'A' SAND PBU 07-27-85 2V-5 ~ 'A' SAND PBU 06-25-85 PLEASE ACKNOWLEDGE TRANSMITTAL . SE.%':UENCE OF EVENTS FROM WELL SERVICE 1A-8"~ bBHP & MISC. 0 lA-5 PBU & MISC. 0 lA-3/ PBU 0 lA- 3--- PBU 0 lb-2-~ 'C' SaND P~U 0 lb-2---- 'C' SAND PBU 0 lb-5 ~ ~TATIC TEMP.LOG 1E-21-' RUN BHP & MISC. 1F-5 '"' PBU 'A' & 'C' bAND 1G-15/ 'C' SAND PBU 1G-15~ 'A' 5AND PBU & MISC. 1G-15/ 'C'. SAND PBU 1R-10.-~ BHP & MISC. 1R-9./ BiiP & MIbC. 1R-12 ? BHP & MISC. 2A-1/ 'C' SAND PBU 2A-l'" 'A' SAND BHP 2A-1-~ 'C' SAND PBU 2A-13~, BHP & MISC. 2B-13/ 'A' SAND BRP- 2B-13-- 'C' SAND PBU 2B-13--' DATA FROM BHP SURVEY 2B-13-~' 'C' SAND PBU 2c-8 psu 2G-16" PBU 2G-16/ PBU I<LCEIPT ACKNOWLEDGED: BPAE DhILLING B. CURRIER L. CHEV t~ON MUD I L D & M NbK CLERK (ISLTD) REPORTS/PRESSURE 8-22-85 8-14-85 8-12-85 8-11-85 8-05-85 8-O6-85 08-15-~5 08-03-85 08-18-~5 08-17-85 08-10-85 0~-06-85 08-09-85 08-15-85 08-15-85 08-19-85 08-04-85 08-04-85 08-03-85 0~-25-85 08-02-85 08-02-85 08-03-85 08-01-85 08-17-85 08-17-85 08-1~-85 BUTION: W. PASHER EXXON DATA *PLEASE NOTE--DISTRIB- UTION CONTINUED ON NEXT PAGE. ~ ~' DATE: ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldcompany ARCO Alaska, inc;....~ Post Offic( ix 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 DATE: 09-09-85 TRANS~]ITTAL NO: 5337 RETURN TO: ARCO ALASKA, INC. KUPARUK OPERATIONS ENGINEERING RECORDS CLERK ATO-1115B P.O. BOX 100360 TKANSMITTED HE~LEWI'~'~ ~RE THE ~OLL~¢ING IT~vlS. KNOWLhDGE RECEIPT AND R3STURN ONE SIGNED COPY OF THIS TRANSMITTAL. lA-3 ~- 8/11/85 PBU "C" Sbl~DS 1G-15/ 8/.9-10/85 PBU "C" SANDS 1Y-8~'' 8/8/85 FLO%~ING PRESSURE GRADIENT "A" & 1Y-12j 8/11/85 FLO~¢ING PRESSURE GRADIENT "A" & 2G-16/ 8/17/~5 FLOWI'NG PNESSUkE GI~ADIENT & PBU 2U-l/ 8/23/85 PBU "C" SANDS "C" SDS "C" SDS RECEIPT ACKNO¥~LEDGED: DISTribUTION: BPAE* DRILLING ~¢. PASHER B. CURkIER L. JOHNSTON EXXON CHEVRON* MOBIL* PHILLIPS OIL* D & H* NSK CLEi{K J.. }<ATHMELL* SOHIO* UNION* K. TULIN/VAULT ARCO Alaska. Inc. is a Subsidiary ol AtlanbcRichfieldCompany RETURN TO: ARCO Alaska, Inc. Post Office~'"~x 100360 Anchorage .... aska 99510-0360 Telephone 907 276 1215 ARCO ALASKA, INC. KUPAKUK OPERATIONS RECOKDS CLERK ATO-1115B P.O. BOX 100360 ANCHORAGE, AK 9951U -. DATE: 08-16-~5 TRANSMITTAL NO: 5267 ENGINEERING TRAi~$MITTED HEREWITH ARE THE FOLLOWING IT~dS. _QECEIPT AND KETUF~4 ONE ?RESSURE FINALS DRESSER ATLAS PLEASE ACKNO~LEDGE SIGNED COPY OF THIS TRANSMITTAL. 1C-5 PBU ' 07-29-85 lC-9 TUBING PRESSURE 07-24-85 LG-15 FLOWING PRESSURE GRADIENT 07-30-85 LY-11 FLOWING PRESSURE & PBU 07-28-85 2A-1 P~U 08-3/4-8 3B-13 ~U 0~-01-85 !U-1 FL~ING BOTTOHHOLE PRESSURE 08-04-85 ~CEIPT ACKNO;~LEDGED: ;AE* CURRIER EVRON* & M* DISTKIBUTION: DRILLING W. PASHEt{ L. JOHNSTON EXXON MOBIL* PHILLIPS OIL* NSK CLEKK J. RATHMELL* STAT~ OF ALASKA* .'SOHIO* UNION* K.TULIN/VAULT ARCO Alaska, Inc.. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 June 29, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Attached in duplicate are subsequent notices on the following wells at the Kuparuk River Field: Well Action Date Performed 1F-1 Fracture 6/1 0/84 1F-3 Fracture 6/11/84 1F-5 Fracture 6/12/84 1 F-9 Perforate 6/16/84 1F-9 Fracture 6/19/84 1F-1 0 Perforate 6/1 4/84 1F-1 0 Fracture 6/1 8/84 1F-11 Perforate 6/19/84 1F-1 3 Perforate 6/19 / 84 1 F-1 4 Per fora te 6 / 22 ! 84 1F-1 4 Fracture 6/23/84 1F-15 Perforate 6/17/84 1F-1 5 Fracture 6/21/84 1 F-16 Perforate 6/19/84 1G-7 Choke 5 / 4/84 1G-1 0 Perforate 5 / 29 / 84 1G-1 0 Fracture 5 / 30 / 84 1G-12 Perforate 5 ! 29 ! 84 1G-12 Fracture 5/31/84 RECEIVED JUL 0 Alaska 0it & Gas Cons. C0mmissJ01~ An~t,,or~e ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichlieldCompany June 29, 1984 1G-15 Perforate 5/27/84 1G-15 Fracture 6/9/84 1G-16 Perforate 6/11/84 1G-16 Fracture 6/13/84 2C-1 Fracture 5/19/84 2C-2 Fracture 5/20/84 2C-3 Fracture 5/21/84 2C-4 Fracture 5/22/84 2C-5 Fracture 5/23/84 2C-6 Fracture 5/25/84 CPF-2 Perforate 6/23/84 3C-6 Fracture 5/19/84 If you have any questions, please call me at 263-4253. Mike L. Laue Kuparuk Operations Coordinator MLL/kmc Attachment (Duplicate) RECEIVED J uz.¢ .41a~ka &~,s~" Cons. CommiSsion .... STATE OF ALASKA ALASKA L AND GAS CONSERVATION C ;MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL r-IX OTHER [] 2' Na)~ ~f(~Pe/~°~ S K A, INC. 3. Address P. O. BOX 100360, ANCHORAGE, ALASKA 99510 4. Location of Well SURFACE LOCATION' 309' FSL, 441' FWL, SEC. 29 T12N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 97' .(RKB) 12. 7. Permit No. 83-148 so- - _1024 9. Unit or Lease Name KUPARUK RIVER 10. Well Number 1G-15 1 1. Field and Pool KUPARUK RIVER 6. Lease Designation and Serial No. KU PARU K R I V ER ADL 25640, ALK 2571 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data UNIT FIELD OIL NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon · [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state alt pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On May 27, 1984, the "A" sands of Kuparuk well 1G-15 were perforated for production. After testing the lubricator to 3000 psi, the well was shot with a wireline conveyed gun. Interval (MD)' 7193' - 7230' (4 SPF) RECEIVED Alaska 0il & Gas Cons. c0mmis¢0n Anchorage 14. l hereby certify that the foregoing is true and correct to the best of m~dnpo~l~dde~ 6/26/84 Sign ed /~~-~-~~~ The space below for Commission use Title OPERATIONS COORDINATOR Date Conditions of Approval, if any' Approved by. By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1 .SO Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Ir~'~ Post Offic~ .-,ox 100360 Anchorage. Alaska 99510-0360 Telephone 907 276 1215 May 14, 1984 Mr. C. V. Chatterton Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Orive Anchorage, AK 99501 Dear ~_4r. Chatterton. Attached are notices of intention to stimulate Kuparuk wel Is' 1G-10 1G-12 1G-14 1G-15 1G-16 3C-6 the following v questions, please ~Mik~ L. Laue rKuparuk Operations Coordinator MLL/kmc Attachment (In Triplicate) call me at 263-4253. 1 ~s Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASK .,,- AND GAS CONSERVATION .MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator ARCO ALASKA, INC. 3. Address P. O. BOX 100360, ANCHOI:~AGE, ALASKA 4. Location of Well SURFACE LOCATION: 309' FSL, 441' FWL, SEC. 29 T12N, R10E, UM 99510 7. Permit No. 83-188 8. APl Number 50- 029-21 024 9. Unit or Lease Name KUPARUK RIVER !JNIT 10. Well Number 1G-15 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 97' (RKB)I ADL 256/40 ALK 2571 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 11. Field and Pool KUPARtJK RIVER FIELD KUPARtJK RIVER O I L POOL NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate ~1~ Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska proposes to hydraulically fracture the "A" sand to improve production. Lines and fracturing equipment will be pressure tested to 5000 psi. Treatment will use gelled diesel to carry 20/40 sand as proppant. Expected treatment volumes: Diesel 18 000 gallons Proppant 20)40 sand 21,000 lbs. Expected start date' 5/21/84 Subsequent Work Beporte~l MAY 1 4 1984 *'-.. ~."<'~-'_..,¢. C;i i': ';.::: Cm.,..'_;. Commission Signed ~t¢I.~,~/~.,~,,~/,,~ /~/~¢~ ~-1¢;~ Title KUPARUK The space below for Commission use OPEI-~ZN~- i ON$ COORD I NAI O!~, Date 5/14/84 Conditions of Approval, if any: Approved by. COMMISSIONER Approved Copy Returqed- ..... ..... By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate KUPARUK ENGINEERING Well Name:., /~-f~ ~ Date .Run CiSL/V a .ll- I DISTRIBUTION NSK Operations Dr il 1 ing Ge°!b-gy ~ tare of AK Blu'el~ne Bluel ine Film Blueline & Sepia Sign & return the attached copy as receipt of data. Return to: LASKA, INC. ATTN: D. Fay ALLISON ATO-1115B P.0. Box 100360 Anchorage, AK 99510 Alaska Oil & 6as Cor~s. ~mmission TO' KU.DARU,x E!IGINEERING / TRNISH!TTAL 5.~2 Transmitted herewith are the followin§- FROH: I.:ELL NAME- D. Fay Allison ,P,E~T ACKNOWLEDGED: ~ -~PLEASE RETURN RECEIPT TO ARCO · ALab;:,A ItlC. ...; ATT~I- D. FAY ALLISON- ATO/lll5-B P. O. BOX 100360 , ~ ,n. ~r,~- AK. 99510 ARCO Alaska, Inc.' Post Office b.,x 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 February 1, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1G-15 Dear Mr. Chatterton' Enclosed are the well completion report and gyroscopic survey for the subject well. If you have any questions, please call me at 263-4944. Sincerely, J. Gruber Associate Engineer JG' tw GRU5/L152 Enclosure i984 ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany 1. Status of Well Classification of Service Well OIL~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO A1 aska, I nc. 83-148 3. Address 8. APl Number P. 0, Box 100360, Anchorage, AK 99510 50- 029-21024 4. Location of well at surface ~ 9. Unit or Lease Name 309' FSL, 441' FWL, Sec. 29, T12N, R10E, UM LOCATIONS Kuparuk River Unit ~ VERIFIFD At Top Producing Interval 10. Well Number 966' FSL, 925' FEL, Sec. 30, T12N, R10E, UM Surf._.[~ 1G-15 At Total Depth_____._B' kJ. _ t/_.__j 11 . Field and Pool 1144' FSL, 1243' FEL, Sec. 30, T12N, R10E, UM Kuparuk River Field 5. Elevation in feet (indicate KB. DF. etc.) I 6. Lease Designation and Serial No. Kuparuk River 0i 1 Pool 97' RKBJ ADL 25640, ALK 2571 12. Date Spudded 13. DateT.D. Reached 14. Date Comp., Susp. orAband. '15. Water Depth, ifoffshore '16. No. of Completions 10/21/8~, 10/26/83 01/13/84I IN/A feet MSL 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 7533'MD,6963'TVD 7419'MD,6865'TVD YES ~ NO [][ 1893 feet MD 1500' (approx) 22. Type Electric or Other Logs Run D IL/SFL/FDC/CNL/GR/SP/Cal, RFT, CBL/GR/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 114' 24" 212 sx CS II ~0-3/4" 45.5#/55.5# J-55/L-80 Surf 2200' 13-1/2" 1100 sx Permafrost E & 250 sx Permafrost C 7" 26.0# J-55 Surf 7502' 8-1/2" 750 sx Class G & 250 sx Permafrost C 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 6834' - 6838' 3-1/2" 7105' 7085' & 6670' 6843' - 6880' 12 spf, 120° phasing 6890' - 6895' 26. ACID, FRACTURE, CEMENTSOUEEZE, ETC. 6954' - 7007' DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED:.l~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None - STATE OF ALASKA ~--" ALASKA _,,LAND GAS CONSERVATION C .'MISSION WELL COMPLETION OR RECOMPLETIONREPORT AND LO _ Form 10-407 Submit in duplicate Rev. 7-1-80 GRUS/WC19 CONTINUED ON REVERSE SIDE 29. 30. NAME Top Upper Sand Base Upper Sand Top Lower Sand Base Lower Sand 31. LIST OF ATTACHMENTS GEOLOGIC MARKERS MEAS. DEPTH 6831' 7006' 7185' 7280' TRUE VERT. DEPTH 6363' 6512' 6664' 6746' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. See attached for RFT results. Drilling History~ Completion Summary_. RFT results; Gyroscopic Survey (2 copi~_s) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge /-/,/ ............. INSTRUCTIONS Date General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. . · Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none':. Form 10-407 <':,::": i, SPERRY-SLIN WELL SURVEYING COMF'ANY PAGE 1 - ' . .... .... ' ,T"~ t ........ - - ~ - - ,t' · nLnSKn '~; ';:':?' "::' ;' KELLY BI_ISH~NG ELE9: = '?7.00 FT. _.. VERTICnL SEC:TION CALCULAT~'~ ALONG CLOSURL____~_ ~ DEPTH I]EPTH DEPTH DEG M I N DEGREES DEG/100 NORTH/SOUTH EAST/WEST SECT I ON ~. 0 ' ~.00 _97.00 0 0 _N r}. 0 E o O0 ' ¢'~.()0 0.00 ~-) :::::::::::::::::::::::::::::::::::::::::: , :., :::::::::::::::::::::::: ::.. .::::: ,, : .::~:. ~:.: :.:::.~:x:::¥,~. ,:~:.:..: .<:.:.,,: :+:~<,::~:;.:...: <.:.> .:.:.::' ',."::,,A.:..:,:,:~ ~:.::~::-'~,.::::. ::,.::x.::,., :::~.::~:: ::::::::::::::::::::::::::::::: .:xx:; ========================================================================================================================================================================================== :::: ::::::::::::::::::::::::::: "~' :::::::::::::::::::::::::::::::::::::: '::::: ....... : :: :::::::~ :; ~ "? ";~: .... ~:"'"~( i~]~]~::~"::~ ~: :~:""~'~H~ (]~ ~'"'~'~:~ "'"~::" E ~ ~: ':?: ~':" ~ H ~ ? ::~:: ::"':: :':' 400 :399.'F~ 302.9~ 0 36 S 60.80 E 0.18 1.58 S '2.28 E -2.75 500 499.98 402.98 0 46 S 64.19 E O. 17 2.13 S 3.35 E -3.95 ~000 '~'?'?.~2 , ~02.'72 0 55 S 77.89 E' 0.05 4.11 S 10.84 E -1Z.53 1100 1099.90 1002.90 I 6 S 79.39 E 0.18 4.46 S 12.58 E -13.25 1200 1199, :~9 1102, 89 ~ I 6 S 8o, 60 E O. 0:3 4.7~ '.~ 14 4~ ................................. . ............. ~ ~ ................... ..~ ..... ~ ......... ~ ....... <..~ .............. >~ ...... , ...... ~ .......... ~ ......................... ~...>~.>~ .......... ~ ~ ...........~.~. ...... . ........................................ .. ... ~.:. ........... . ........................ . ............... . .~:,~ .............. ~:,- ...... :~ ............. ~,)~::::::~:::~<¢::~:~ .............. .: .......... ~:...~:~ .... ~. .... . :..~ .. ........ :::~::::.~ ........................... .... ,~...~.. ~,:~,~ ....... ~ ........ ~::~ ........ ::..::~.: .................... ~:.~.::. ..... .:: :. .......... ~:::. ..................... .~::, ............ ..~,:~=.: . ..... ..... ~:: .....: .. :::::::::::::::::::::::::::::::::::::::: ?: :' ': .'::s:~g~:~:~::: :: ....... :~:::' ':' ::::::::::::::::::::::: :*~" .":~':: :" '::': :::~:~::~: ~ ~:~ :' "' :~:::::~ : ........ : ~:~;: ?~¥~;?:" ' : :' :':::::' '::' ':::':"::" ' ::::::::::::::::::::::::::::: '":::::?'":'" :::::::::::::::::::::::::::::::::::'::: ";:~' ::::::::::::::::::::::::::::::::::::: ::?:~:'"':::::: ~":'"":'":::.::':""':':::::: ~600 ~5'~:~.8~ ~o~.ss. 0 '32 s 7s.~ E O.O7 · 6.3S S ~'~.~?, E -~0.4~ ~700 ~'~.84 ~02.~4 0 40 S ~7.30 E 0.~5 ~.~ S 20.~8 E -2~.50 1800 1799.84 1702.84 ~ , 0 ~7 S 6~,1'~ E 0,~ ~.1~ ~ 21.7:3 E ::~?:~:~:::?:~:?~:~i~::~:?:~ ........... ~'""::: ~"":'~"::~::~: ~:~:::~:~: ........ ~:~'"?:?:: :::::::::::::::::::::::: ::~: ~ ~::~:~:~:~::";'~':~:~::::~: .:.:..~...~:~:::~::~:~:::~:.:::.....::::.::~:.:::.:.:.::~:::~::~::~::::~.~:~:~::~::~:~:;:.:::.~::~:.~:~::~;~::::~::::~:~::::::::~::::::~::~::~:~~::~:::~::::~:~:~:~:::~:~::~::~::~:.::::::.:~ ~:::.:::::~::::::: :~'~:?::~:~:::~:::~:~:<':':: ::::::::::::::::::::: :::::::::::::::::::::: ::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :~:::~:::::E?:::::::: 2200 21~:~,~0 2102.~0 1 0 N 55,19 E 0.52 7,04 S 26.90 E -27,22 : 2400 '?'~99.76 '?qOO 76 I 9 N ~4.50 E 0 J l l_A'~ ~ 2'~.'~ E :::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: · ~:::::~:: ':::,. ====================================== :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::: :::::::::::::::::::::::::::::::' :::::::::::~ ~:'~::::::~::~ ' "'~:::::" ========================================================================================================================= :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :." :::.:':':::.:' ================================================ ;' :: i '. :::::::::::::::::::::: ':. ::::::::::::::::::::::: :.?':~:~: :.,: :::::: :::: :~.~::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: :::~::::::::?: :::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~::: ::, :::::: ?: :::~'~ ~:t~:: ~: ::::::::::::::::::::::::::::::::::::::::::::: · ,.. ::::'..,: ::::::~ -'-'.." :' :.::: :::::::::::::::::::::::::::: :.' .~':::~:::.-" ': '....' :~:::x:::: ~:-~.:x.','::-.': .::-' ..... .>::..`..====================================================================================================================================== :::::::::::::::::::::::::::: :: :::.::: ::.:..: :.r:::::: :'::': :::-: .:::,> .~.:,,:::.:.: · :. :.:". ::::' ':-:':::.: '-.::::'. ~:00 ...' ....... :::::':::: .... ~9:.:I:: ............ -.. ........... :::::~:? ~::,' ::' · ?:.:'¥:::,:.:-::,::::: ::':::::::: :.:,::.".': ...................... : ............ · ::. ::? ": ................... :::.~::::~ ........ ": ,::::::.':: ::':::,::: :::::::::::::::::::::::::::.::,::::,?~::<: ~?: ...... .:::,:. :;::::::¥::..::<. ' .:,:..' ........... ~Ou 27w9.70 ~ 2702.70 0 49 S 55.89 E 0.37 , 3.00 S 36.09 E -33.66 2~00 28~.6~ , 2802.69 0 53 S 45.1~ E 0.17 3.~5' S 37.24 E -35.12 ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :.: '.: :.:;,. :::.:::: :.::,.: :::?.. ::::::::::::::::::::::::::::::::::: 0 0 0 AI_Ac, I ..A SPERRY-SUN WELL ~_~LRVEYING COMPANY PAGE 2 · ~:~'~"?.41.'.!i~~ ~,,~., ~ ~['"'? i "":' "~:'i~'!~ ~i '" '"??" :'?'~'~ ~"~ ~ ~ ~ ~i~:;~ ::~ ~:~ ~ ~!~Y~? ~ ~:~ ~ ~ ;~:~?'~'~':'" "::~"¥':'""~::]~'~:'>'i'~?, ~;~;.~b &-~.::~ ¢'? "!' '~ :' ".?.' ':~L;.;¥~ ~ :''';:~ ??~:~' ''¥~ ":': ~ ~ ~ ::~~'9:' ~: ~ ~ :~:~? :~:~:~:~;: :~; ~ =. :~ ~:, ~?'"::~;:~:~E?.~ :'~ ??::;:~::?'"::?~:~~,~:~<~?'?/'~'%~:~ ';' ~?,~.:::~:¢~V'~'~?] ?'~]??'~ ~' ~?~;~;~?.~ ~:~ ~:: ~,~:' '.~' ~ ' '~ 97, KELLY BI.I~HING ELEV,. = 00 FT, OF'ERA T OR-MCGLI ~ RE PERTI[:AL SECT ION C~ DEF'TH DEPTH iL _.LILATED./:tLu~.l.J L.I__.U._-,IJRE .... DEPTH DEG M I N DEGREES ,, P99.67 '290';'./~, :'-:000 DEG/!00 NORTH/SOUTH E~S'I'/WEST SECTION 7 , I 6, S 21.89 E O. 46 . 5.4(3 S" ' 2-:.g. lA F -'=:* 3400 3399.61 3302.61 0 51 S 54.10 E 0.27 '11.38 S 41.74 E -42.45 3500 3499.60 3402.60 0 46 S 45.60 E 0.15 12.29 S 42.83 E -43.83 · =, (' ' ",=~C~ ,-, '-'=-'9 =0 '7_~ ' ~ ~ 1~. o4 ~ 4-~. 81~ -4._,..:,= ~, 6 .~ O ~._, ) .. , 59 ._~., 0 ~.._, ~ 1 = 1 S ~ 4.60 E 0.7 :::::::::::::::::::::::::::::::::::: : ' "" ....... ~ ....... ~ ..... ~ "> .....~ ...... ~'"~ ~ ~ '" ~ '" ~ '~ ~ :E( ' ::: ¢ :'$ :' ~¢ '~:" ~; ~ .....~..:~:: ....:..: :..~:~ ::::;::.: .......... ..::::: ~.~,~:~?~`~,~*~;~`~?~.~.~?~?~,~.¥~??~.~'.~*`~?~.~.~..~. ............................................................. .:. ................ ~ ................ ~ ..................................... . ........................... , .................... ~ ............................. .,,.:.:,.,.:.:.,.:.:.~ ............................. ~ .................... , .............................................. B..::,~,,,:,~,~:~ ...... ~ ...... :::::::::::::::::::::::::::::::::: ................................ :::::::::::::::::::::::::::::::::: ................ :::::::::::::::::::::::::::::::::: :. ::.~:.:~:~:::~:~:::??::.:. 3800 3798.95 3701.95 6 8 S 65.80 W 6.15 27.04 S 39.35 E -47·27 3850 3848.57 3751.57 7 56 S 83.50 W 5.60 28.53 S 33.48 E -42.67 3 y 00 L48 .. b: ~ o ~ .-, o - - .- .o · _*~,o 1.01 B ~5 N ...74._~9 W 7 ..................~ ~ "~'~ ....... . ................... , ....... ~ ................. ~: ...,~.,~ ...... ... ~% ....... ~ ...... ~ ...... ~..~,_~.¥ ......... ~ ..... ..~ ......... ...,..~?~¢ ..... ~.~...,..., ~ .......... : ........... ~ ........................ ?.~.~-.., ........ : ........... ~..; .......... ~ ................................ ~ .......... ,..?.~ ~ ................................ ~,, ........................... ~,.,..., ...................................... · ~.,..i~ ............... . ....... !.~ ............. ~ ...................... ~...~.~..~'.~.-.'..~ 4100 4091.63 3994.63 18 10 N 70.89 W 2.68 10.09 S 19.65 W 13.12 4150 4138.87 4041.87 20 8 N 72.39 W 3.89 4.~5 S 35.20 W 29.33 4200 4~:~5.50 40:~8.50 22 1:~ N ~8. :::::::::::::::::::::::::::::::::::: ' '- : :.:~:::::.:::.:,:-~.:.~';:: ':' ' ":' ::::::~::~ '" ============================= ::'~ ........ ::::t :' ============================== .:: ::~::;:;:~. :.' ,.::.:.:~:~:::::~¥~.:' ::: :.,'::.".- ::v.":/.~.::.,,:::.;'::::;:::~:$:::~x 4400 4364.86 4267 · 86 29 51' N 62.89 W 4450 4407.69 4310.69 32 12 N 63.19 W 4500 4449.54 4352.54 34 5 N 65.10 W : :.:: :~: :~ ,,~:+> 4.....:.::: :. :,:,: :.$: :,:. ': ..'. ~." ':..: .:.:.%,:' ".~b. <..':', :'.-. ':':: '.'.'. '. :.. :'.' · :- '., ,>. ~. ~:: ~'~:¢; :S,: :':'x': ..,. -, .x :,: :... ~. &.., ,:..-,~ f.:-,:¥:. :¢>: ~<; ~,-; ~: ¥ :...: ~:: r :..-. ,::: ::.. ,:.:,:< ...:7: :..,- ~ :. ::::~2,¥ ::;'~":: x ~. ,~ ?.~'¢, ~ ::~x,~ ~:::~: ~¥::: x ::,':~ ~ ? :::::::::::::::::::::::::::::::::::::: :i::!;:::: ' 'l "::::::::::::::::::::::::::: ':' : ~ ::?: ::: .'::?:~E::h:::!'i::::" ~ .: :::;:: .::!" .':~.??:~;~::~:~:~:~:::~;:~::;: '::;:;!:~: :':: :" :'::::;?:?:$?~::i:i~ ' .!&':::: ..: ..,.:i~<:~ ::~:~: ::: :::'.:.:.::: .....:..:..,::..:,::...:.:,...,: :::.:..: : ... .....: ::.:.::~.::,..: , .::::,. · :.: .;:::¥:~:..:::. : ~ : ::::~:::. ,:::.:~:: :~.,¥::.:: :. . , ~. · ~ :~.~ ~ ....... ~ ~'.: ~:~ 4700 4612.50 4515.50 36 7 N 64.8.9 W 4800 4693 · O0 45'.:26. O0 36 39 N 64.50 W 4.84 36.55 N 132.86 W 135.26 4·71 48.23 N 155.83 W 161.03 4.30 6~.14 N 180.44 W 188.:36 ;~:: ::::;: :;:. ;:L~:¥:.,'.;: '¢ :,-: ~: ::¥::.~¥::¢:::::: ::: :~..%?;.~?~: ~..~ :.~ ~:]-.'¢.%':.:':,':::¢':. ,~'~: :.: ::i"~:: :::::'¥ :;:::'.: '~.: ::':::::::;::; ::::: :': >.>: ;,::::::::;.4.,~ ~:::,,~: ::::: :; -:: :::.4,~ ::~::: ':~,':::~.~: ::::: :-'.:: ::::~:::: ::' ::: ~ .'2. !:: :.:~ :::i:::: :::: :':':: $ ':: ":: :" :: ::': ::'. ' ': ~'; ~ ~'- ' ::::::::::::::::::::::::::::::::::::::::: ':' ::.< :~:?,~:~.%'::~'<~¥.~::~¥:" 4 /':: :.::: ::::::::::::::::::::::::::::::::::::: :- ,:'::.:" ..:. ::::::::. ' :::::::::::::::::::::::::::::::::::::::::::: ' .::" ........ , ..... :..,~. :: ..... ¥: < :':'::.~A":>>: ...... ~'-"":" :'::::" :' .:::: ' :'::: ......... ...:.~:.= ...:~::::~.~-:.:.:, ~::~.,~.×%.::~.:~.<<,,~,,:.'.:¥. ? :,::. :.:. :::.: .-:::: ======================================== ":'.'"'?::i:"!'~: ..:,~:i!:;:'i:!:!:i:i:::ii'i :i' i:~ ' ':': : · ~::~ ~ ~ ~ :.~:: ~; ~;: ~ ~-~.'.~'..~ ~¢~i?;ii~ ~i8~ :~:: t~:: :~ N; ::::~::;~;~:: ?:;::?:::.~;~::~z~ ~'~:~:: :.~ W: ~': ~:~:': ~::.:-':~ :~ ~: :~:~ ~ 5'-':.76 :: ..... '.' ......... :.~,,~ ....... ~ ...... L,:b' .,,.:::2..,,x~.~...,,.~.-, -,. · :. ,:>'., '.. ,: .-'. ...... b,." .......... '.......:,.,.,-:,:.,..? ........... :.:::- .-'::-'~:.:,: .... · O. 71 108.77 N 285.68 W 304.2/=, 0.59 134.13 N 339.32 W 363.58 0 0 0 -. SPERRY-SUN WELL SLIRVEYING C:OMF'ANY FAt:E :'4 A N L:I-ILIR A L.i[E ALA.-,I.:.A ,, - ~ ..... .~.~..,..~..: ......... ~ .............. ~:.:..,: ............... ~: ......... .=:~ ......... ~:~:::~ ................. .,. ....................... ~,.. ...... , ....... .,.:.,. ...... : .................. . ........ ::::::.~.:. .............. :.. ........... ..,. ................................................. :.,~ ............... : ....... ~:.....: ...... . ........ . .... ::~::::::::¢': ::F :}:" "~. ,::~:!: ' !:*,.* ..'.!"...'t'~.:' ':::i::, r"::~': ':: "::::!:'. ':!' :i,':". '~" ::"::i::i:PiSi:~!:i:i:~8::~:L::::i~Si:i:SiS:!:i:!:K'!!:~;!~: !E::!:!:~:!:i:DP:!:i!!!:~! ::8! :8 i;:i:i:! ;! .::!!:i"' S ......... :' ' :F', .... ' ":i" :" '?"'i::!i ":' ":: ' ' ::Pi:~:!~:i:i~:i:h i ~: :: } :! ! :;~ : ' :: ........... ~.~ "":!~' ' .'"' '::' ~F" x~./. : ...:,, ~::;:::,,~: :::.: '.' ::: :!:, ::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ..: x:.::.: :::J?:¢::?:i!ii:: iii :'97: i'"?':9' :':i::':' :'":i:"i:: :'=i:'~.ii~is ii=:g::iiii:::=!ii=ji==i:=::i:]=!iii:ji!ii!i i :: i!:=ii ~ii i iig!~iiiiiii~i:=ii=:ii i ~ !iii::i:=ii::giil ~!iifi~ ':::ii==i=:!iiiii?: i iiii!?:iiii!iii =.i::=,iiii:/:i iii!iiii:j?j i ii i ii ii! ~ i ii~i := i?/= ii=:?= ?.i F: ii:: iii!ii:: ii=: ii!=/:ili:: iiii?///: iiFJi:=i :*?i ?: ~:i??11i?711 ? =+i..-..'=j¢ iii??~¢i'hliii!i ??:::::=. ?i:ii~:!:~!~:ii ::g :=!iiii!i!illg ii!ii=:iAi=J=j!::iiiii:i!?/: i¢= :¢jili ===jiAi~iiii===¢¢==ii!=?!ii?: ":*s!h:: i': :;:;:=~::ii?. :i *:~;?:::!*::=::!i?!:i¢i iii??/:'!~?:i:: '~'" 97 OC) FT ~[.~oK~ KELLY BUSHING ELEV. = DEPTH DEPTH 4'..~AC~ ' 4772. ~,~,oo 5089.9:3 · .,oo0 5129.40 OPERATOR-MC:GU I RE :~.:.:,:.:,:.:.:.:.:.:.:.:.:,?:,: :~.: :::::::::::::::::::::::::::::::: :,:.: :.: ::.:,:.::::.: :.:.:.:.x. ,:.::: :::.: :: :,:.::: :,:.:: ~.:.:' :.v::.. ::::::: ::: ::,:',::;::: .:::! i:i i:i:~i:i:!:i:i:!:!:!:!:!:ii!i! i::! :i:!.!!iii:! !~:ili'.!::ii!i:::i?!iiiiii:::iliiii!!i?:i'i,'F/:: DEPTH BEG 'MIN DEGREES BEG/lO0 NORTH/SOUTH EAST/WEST SECTILaN 4675.91 :37 15 N 64. 0 W 0.'67 160 '-"= '"'":~'""A: ':':"': "::':>.:'!' ~:':::;:b¥.':b]::'::,'.]'~' :~',~ '"'.'"':':':::~.;:.Y..~<'~';.',:~::':::.~;::'J';;~!'::!:'!':'×: 4992.93 37 50 N 62.80 W 0.37 269.7!5 N 611.42 W 667.61 , 50o,~. 40 37 52 I N 62.89. W O, 14 283.76 N 6oo. 73 W 698.29 5400 5168.88 ,~07~:8~' ' 3~ 50 N 63. 0 W ~ 0.14 2c.~7.71 N 66A.05 ~ ......... ::::.::~i.,..: .~ ....: .......... : .......... :~.:.:::.' . ~.b' · ., ~.i:~ . ' ':' ~ ~ ~: ~:~ ~ : .'. ~ ..~': , ,~r~ ~ ~:~ '~. ~.~, ,~ '. ~ '~.' ::.'::::: ~ :: ::: : .. ':' ". :' ::.::::::.: : ~ ~ ~ ~ ~ ~ [ ~ ~ ~' :.'?: :.: [ ~?: ~ ?: ~ ~ ~;: ~?:~?'~?:: :":~:':' ~ ~] ~ ~:~ ~ ?~ [: ~ ] ::~::::! I'" ~:'?:~ ~:~: ~:::',~ '~: .[ ::~ ~;~: :~ : ~:::~ ~ ~.~ ~ ~:~ ::?'I":":?:] ~ i-:': :: "' ~: ~[~:: ~} ~'~J~:~: :':~ ~:~: :~ ~[~: ~ ]:: ~ '"~'~ ~'""i i ::'"::: :.": ~.~; ~4~ :':':'::] ;'~ ~;~::: ~::~':~~ ~?~ ~ ~ :~ ~ ~':'::~':'"":': ~]~ ~ :~' ' "~[::~ ~:: ::~ ~;~;~[~[~'":::']~ ~:~:~ :~ ~~,} [:~¢:]~ ~':":':: ?: F:':~?:?~ ?~: :: ~]:::::": ~ ~'~I~: ~ ~ ~ ~ ~::':':: ~ ~:::: ~::":~:::::::'~: ~:~ :~:~ ~ ;~ ~:~}~b~:~ b~ ::: ~ ~i~ i:"'::~ ~]'~":!: :::'::~ ~: ~ ?' i~ ~ ~:'!~::t~::~:":::f~:N~ :~ ~ ~ :.~j~: :~ ~::~ ~: ~[ ~ !:: :"~ ~:~:~":':i ~?':::.':':':':~F:~:~::':.;t::'~: ::::::: ::: :.:.:::: :: :~ ..:: .:: :,: :.., ,:,,,:.,.. :.: :,:, i.::,, t..:,:. 8 ::..~.:.. ,:.~:...:,: :~..: :l:, ; ..... :,. ,.: .:,..,.~.¢:. ~..::: ~. ~:.,.:: :,i:,: .:, ::,...x :,. ~,,::::: ~: %,,. ~:, ,2.: '. ~:.:,~: :.: :~. s,, :. +..: ~:,:, ~:..; :,:, t:: :,: :, :..,, ?~ o:.,. ,:. ~;~. ~.: :,., ,:.',: ', ~. :... ,:,,..:,,...:, :. ,:.:~p ~,: ,,. :- ~o:. ,:~..~:,:: ~:~I~?. ·..:<..: t: :..: :.:,:.:.:.., ,:. :,:p ~.~.~.,... ,~::.. · ~.:~p:::: ~: :~ :, ..., ,:. ,: :.: ,.: :,: :., :.: ,: .:::::: .:.: ~: :.:: :~: ~: :~::: t ::: :. : :,:~ .:: ,x :: :,:,:,::: :':::::::: :,::: ,~:::::::::::::;:.:::~:~:~: ':::~:E:~,,,..: :. :. :~:~:~:M:::~:~:~:L:~8~:~: .r :,:. :::: ~ :~:?~:~:;' : ",::::~:~:~',:~:~:~::~:~:~:~:~, i. :~ ~:~:L 8~:~:~:", ':' :E:::~'::~::~:~]F::~::~:K::8~:~?;~' :~::~:~:~:~:'.:~ "~:~:::~:~F~Z¢~:~'.~:~:~: ':: ::~:~:~:]:~" .~?' '~M:M~' ? :~:~:? ;:: ~:~t~;~:~:~:t:~:~:~:::[:'8 :~:~:~J:~::' "::tb:~ .:,:..~:~![:~:~¢:~:~:~:~:~:~:~::~::~:~'. ',.....k."~::~: ~3' :::':.~:~:~; .::~:~:~::~:~:~:~:~:~:i:::~:~:~:~:~:~:' ',~ :~:¢::~:~ ',:::: .:: .:: 5800 5491.64 =~'"~ . . · _.~.64 35 12 N 64.10 W 0 28 402.71 N 877 62 W 5900 5573.55 5476.55 34 48 N ~4.69 W 0.54 427.50 N 929.35 W 6,(:)0 J o6,._,6,. 14 :::::::::::::::::::::::::::::::::::::-~:"':::' % '::'PS~::~?~:~ ," '"' "::.::~Y ~:~::~:~ 6400 5992.14 6500 6077.75 980.4~ ~ ~07:=:. 8.':.-.,' 1172,. 65 W 1295.75 1218.13 W 1347. 6900 6421.77 6324.77 7000 '6506.76 6409.76 7100 6591 . 65 6494.65 7500 6934.32 6837.32 7533 6~62.63 6865.63 31 28 N 60.50 W 1.22 674.74 N 1396.93 W 1551.26 32 7 N 61.10 W 0.73 700·44 N 1442.93 W 1603.90 31 41 N 60.89 W 0.45 726,(')7 ~ !489,16 W ~656,70 :..60,:~0::~:,::W:,.,:~. :.:::~:;~.:~:~::~?~:~::~:~:~:.~"..~:~:~!8`~:`~:`.~::~:~:..::~:~:~$:~"~3~ N,::.::;:::~ ,:::,:::t ~..:~. ~::~.:.W .~:::.?... ::.,::.:: :!76o-14 30 55 N 60.60 W 0.03 827.08 N 1669.08 W 1862.76 30 55 N 60.60 W 0.08 835.41 N 1683.85 W 1879.70 0 O, 0 · . FERRY-oUN WELL SURVEYING COMPANY FA~ E 4 ' :..:'. ::~::. .:~H:h~<`~::~::~::.:~:K::~:Fx:x:h:~:?.~::~:~:::::~:~.~:~:~:~::x::~:..:~:~3~:~::::~:~:x:::::~:: :i::::::::: r ' : · ~ ...... ~'"~' ~ ~J~' 'x ............. .'..:::,.:,...:-:x.:,'....:: ............. -. ............ ~ .......... ...... . '~7.00 FT. RL~c,K~ KELLY BUSHING ELEV = ::::::::::::::::::::::::::: ====================================================== :::,:.: .::: ::::::c.~x ,.:x::: :¥:.., '. :.. :: ~ ..~: :. :::: :, ./ "; MEASURED VERTICAL VERT I CAL DEPTH DEPTH DEPTH RECTANGULAR COORDINATES MD-TVD NORTH/SOUTH EAST/WEST DIFFERENCE OF'ERATOR-MCGLI I RE \ VERTICAL C:ORRECT I ON :qO00 299.9 67 2.902 67 5.40 ':' - - . . o 3~ 16 E 0 ~"~' 4000 3995.86 3898~ 86 20.41 S 7.08 E 4.14 O. 15 3.81 5000 ' 4857/., ~0 ' 4755. '.-"0 187.2~ N ' -448 _06 W 147' 80 143 ,~.6 ............ .--,----J ........... c-.--,.;:-'..-....:~. -.~ .... .k.. , .... -. _.., -,,.,.--. ..... -.. ~ ~ .¢.,i.' _... {...., ~5~.~..~ ....... _ ....... .,... -, , I · I ................................................................................................ ::~::::?.?::~:::~?:~:?:~::~::~DO.'O'.~?~¢~?:~::~.~~;:~;~?~:~ .....................................~~;~`~::~::::::~::~:~::~:~ ' ..................... ;~ ;;;~;~ :' D~' ;~;~;~;~ .............................................................................. ~:~;~:~:* ............. :m::.: ~ ~:.,?. ~ ~ ~;~;t ~::.~ ~ ~(~~~::~ ?: ~?. ~ ~;~~~ ~ ~:.:.~' :::?~:~: ' ............... ~ ........ ?,~ ~t~:~ ':~'~ ~ ~,;t; .......... ~ t~ ~' ::~?:~ :':': ~: ~ ~' .............. ? ~;~ ~:??: ;~~ ?'~t~:~:~:~?~~:~~:~ ~.' .~,, .. ,~?:~i~: :~ ~::~J~::t~i~::~::~j~:~:~!~:~:~ ':~ ': ~t~:~' ~ ~ ~::~? ?' .......... '~:: ~' '~:~ ~ :t~? ...... ~'~ ~ ~::~ :::~ '~t~:~'~::~ ~ :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~:,~·::::::::::::::::::::::::::: ~:~ -~-~" .... ................... ~ ~?~" ~ '-"'" ~ :~:'~¥~:' ~,~:" ~ ..... ~ ................. ........ ~' "~~;~ ' ':'~* .:,:::~ ~:::' ' ..... ~'~:~ ~ ................ .............. ~;'~?~:~; ~ ~" **~ ~ ................. ~:~: ~:,~ .... ~ ................................. F~ :~ ......................................... ~ ~?~ ;~ ¥:::::~.~:~..~ ~ ~:~?~;~ ~ ......... :~ ..... :~' ~ ~? ~ :;~:~:~:~:~:~:;:~:::~:~:~::~::?:~??~:~;~:~:~::;:~:~:~:~:::~:;::~:~:~?:~?~?~::~:~::~?:~?:~:::~?~;~:~?~:::~;::: ~' '':~ `~t~:~~::~:~::~c~:~:~?~:?m ~ ~ ~ ~:~ ~:~:~~:?.:~:~ ~ ~ ~ ~:~ ~ ~t.~: ~ ~ ~:~::~ ?.i~:~?.~:~ ?: , ~ THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. . '~' ...... ~..~ ............ :.< ............ :`::::¥~.+(¥~¥:::::.c.:~:~:~¥~¥.x:~.~.:s:~L+~¥n<<~:::c.%¥...~"....:::.:~.:.:..~¥~:~:~::.x"p~...:...:.:~.+.:`..~.¥::x:.:~:.~..?~:.::~.:.~¥`.:~::::~:~. ,.~.<~ :~:~:~:~:~:~:~:~:~:]:]:~:::~:~:~:~:~:~:~:~:~:~4~:~:~::~:~:~`~1:~:~]: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: · ..~ +..:.. +.. < ............ · ............ :.:..:.:.:.:.x+:%...::x.:+--..c~+'-:. ~A.~+:~cx~ '~:..: .:.:+:.:~c~:....-+:c~:--:+... ~:.:.:+:+:..:.-...A.-.A+:+A.x.~ .:. ~c.:.:~+c:c.:.. ·. ·. c..:.:.:.:.:...:.'..... ~ :.:.:.:.%:..:.:....:. +:.:.:+¥...:.: ~:.~'.~;.: ..:.:.:.:.:.,........-...........-+:.: v......+ .x..........:.:.x.- ~-.-.......... ~x..~ .....~.........~.xcx...~....+~,... x.~.~x~.~...v....~ 'L~ ~c ~.-.-~'.'.'.'.'.'.~'............~...............Zv.x.~......~ ....'.x.'.'.'..'.'~ c........+. :.:+-.......... - .x~.x.'.'.','.'.'.'.'.'.'.'.'.'.'.'.'.' '.'.'.'.'.'.x.'.'.'.'.'.' .'...' ALA~.,KA SF'ERRY-SLIN WELL oURVEYINu COMPANY FAL:E 5 - '" ~ , 97. KELLY BU:~HINe ELEV = O0 FT. OF'ERATOR-MCGLI I RE MEASURED, VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTiCaL DEPTH DEPTH DEPTH NORTH/SOUTH E~ST/NEST ' B~FFERENCE CORRECTION :::::::::::::::::::::: ,:.,,,.,,,, ::::::::::::::::::::::::: ..,::,: ::::::::::::::::::::::::::::::::::::::: ,.;,,~::;...t,,.,,:::::::::::~¥~::',;~;.:,;::~::::: '~ ',M."..:~;~:~:~;:~::~::: ,,:<t~,.~:,%::: t~::,,~:,. ,,:~:~::. ,,:, -,;:;:: M:'.~:~::;::;~:;;:.:~'::~M:t::::' "%::::, 4.' :::::::::::::::::::::::::::::::::::::::::::::: :1.' '~M::: ':,' ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: .4M:::t-: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: 297 297.00 200. O0 1,15 S 1.4& E O. 01 O. O0 397 397,00 300,00 1.57 S ?- 2.2~ E 0.01 0.00 497 497. O0 400.00 2.12 S ' 3-32 F ~]. oir, O. 01 .. x.x.: : :.x.x..,.x+:,.x.x.x.x.:..<.x.:.x.x.x.:.:.x.>x..-:.>..' .:.x.:.x.: ~ :~ '~:~ ~4~'~:~:~:::x:i :~]:: '.'. · ~ · : ~ >: >.~.:> ~. .:~.:.~:.:.. '.>..:.> ...... :...:.:,.,.................. ..................... xx:.:'.":'.~:.~: ' 'p:'"'.:r".m~:."<:"<'::::x<~x~:~::xx:::~{<(:'.,',+>'"< .................... >'"~ :'"'. .......... ..<<...,......<:..:~.:..;.w.::~' .:;;..::h~'"'¥ '::~:" ::::::::':k:~::~:?~i~:< "'~ ~::" ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ';:::: .'> :x.::~F:: :: ~ :~ :l: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: . ~' 897 8~7.00 800.00 3.74 S ~.~o~' E 0.07 0.01 ~97 ~7.00 ~00.00 4.10'S 10.7~ E 0'08 0.01 . lo~7. ~097.00 1000, 00 ~. 45 s ' 1~-~:3 ~ ~_ O, 0? . ~0, 0~ .... .. i · . ::::: ::':: ::: i , ',;,:,;-;~,-~-,:~-~:,>',~ ~:,: ,; , ;::;~ ",':;:::;;;::~:::~;', ':" :' ',. ;:::'," <:;%:~<.::.,,:;~. ::,,:~.,T,~,;>:~,,:,:v ..,:.,)~,.,. .:<4,:, ,,<;~,'.:.:;,:,~.>~;~.;~',-,~,;.;,, t<,, ",:" :<:;';" ',.. ~,'~' .:.'~.~;;~;~>~:,. ,:t. ,%>.. <<,. )%<<.>4.444,>:4v>:>~>t.t<<.~.',%:t.>;:'~4¢<,.C.,;<<<<< .' v:<<.... '<<<,,,'<.>:<.;>>;~<h<,~;~:>>M,:,,>:M.t.,<<.< , ..<<<<.: <.'<,;:->?:; , ~::~;:~::~::~ ~::?": ~'~'~ ........... ~'~'~'~ :?:~:. ?::~ ~ ~ ~:: :::': ~' "~":':'~ ':~':'~ ~=:'":'~::':':::~ '. ~ ~':~'~::~':":~ ................ ~?~:~'~:?:%::':';:~::~;~::~?:~ ~ ~:~ ~;:~ ~A~;~:':":' ~ ~??~: ? ;~ ::~:~f:~::~ ?~,~:.~7 ~' ?: %?:":::: ::~%t?~?'~:?:~?'"."i~ ~:~::~;:::~::~;:~::~::':':::~:~: ~ ~'::'~::~:'"":'~: ~ ~::~ ;::: ?: ~ if:~::?::: ~ ~'::::?::,~ :~::~;:: ;':~ ~;]?} :': ?:~;:""~::: :::::::::::::::::::::::::::::::::::::::::::::: ~:::,~ ?:~:: ~::~::.~?:: ~: ~?::c: ~:? ~? ?.~ ~': ~'~:: '.~:: :: .~ .::. '~::: ': ~: :': .. :' : 14~7 14~7.00 1400.00' 6.02 S 18.71 E , 0.15 0.01 1597 15~7.00 1500.00 &.32 S 1~.67 E 0.15 0.01. 1697 1697.00 ~ ~609~09 6.68 ~ 20.65 E 0.16 . .0.,.~]~ .................................................... ~:~:~;~:::?::.'~';'-,,-~?.--~,;::::::::~:: :~::::?:.:~....:~-...:.--.-.-,-.~pp-.-:......:: ~ ~:~:~:~...:::...`.`::...~:?...:l:~.l~:?..:::.:..::~:~.~:~::~?~:~::~:l~::.~::9l~:?l::F~.:..`:~:~:?:P:~'~:~:~?~.:.x.:~l:~:~:.~l:~ t::~:...::`:~:~.:~.:.::::~:.:.:~.~:~::.:.::~:~l~:~~:~::l.~:~l~:`.:~lt~;~ll~;:ll~:~:~:~::;::~;~:::.`~::~:~:.::~:~:~:l~::~:::..`.::~::l~:.:.:.`~:..:.~:~.~:~:~:~:~:~:~.~?~:~:~;l~:~:~:~:~:~:~:::~:~:~`~:~:~:~::::~l::~:~.`;l::::~:~::~:.::: ::::::::::::::::::::::::: ~.. ~.. , ,,.,.--.-......~..;.-. :;.,~.~.~.,--.,,-~,.....-,,.,.,.~.~..,,,-.....-..... -.. -......,....,-.-.....-...-,- ..-.,,~.:~.:. -~.~ ........,.-- ...--.........-......- · -- ~ , ~, .--~ ~ -~.-~.:~. ----. -.- - ..: .~?;~ .::: -, ~2~:~:~2~&~L.i:: L¥ ]i?}~ :i ?:? ?::.~i ::~: ~ ?;' '?;:7~: ?~ '77~::?:?::¥¥::~:~:.?:¥.::??'C '?'~'~=~' :? :. '?¥' "' : :.::::: :?: ?i~?::7~?~:~:~:?' 7:~: :.~::~:.:::::¥.?: ?~;=~..:?f~??:???~?:~? ?~?:::~;:~::~'}~????~?:?:~?:?.:%:~::~ :,¥::.:~:: .~f?t=?%~9:~?::~i:=??:?::~;=.~ %?~=~?:~??:~:? f}?:?:::~=.i~:~::~::~:J~;~:.~?:~;~i~::%!~:?:%:?:}??~} :~'?' :::7 ~??.???f?~?:?¥~: ~= > ?:?: ~: ?'~?~':' ':~:'¥ :?-::' ':: .... ': ALASKA ~FERRY-~.LIN WELL ~LRVEYINu COMF'ANY --' -- ' "',~ h.'.' ," PAGE 6, · MEA'.-]URED VERTICAL VERTICAL RECTANGULAR COORDINATES , MD-TVD VERTICAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST ,D, IFFERENCE CORRECTION .-~ .....21'.."77 '.';'197.00 '-':'lAC) O0 7 06 S ..--6.86 E 0.'-".,:0 2297 2297. O0 ~,._",nr~ O0 5..'91 S 28.35 E O. 22 ~3'.~7 i 2397. O0 ~00. O0 ' 4.66 S 29. _.'94 E O. 'v4 O. A'.-'- [:~ ~ ~ ~ ] ~ ~ ~ { ?~ :: [{ ::::: :} :i]~ :~ [~ ~] :~ []: [~]ll [ll~lllli l:li' lll{ :~:~:::~:::[:~:~ :::::::::::::::::::::::::::::: l'li~l [~: ~ ] J: J I~: :: :~:l::. ~~ ........... : [~:: :::: ~:: ~:: ~} :: ~: ~[[~J { ~::: 1 ~ ~ ~ :~'J: [[ :J:l: : [:~[:: i: J:~1/: ~ :l[J: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :l]I: J:l:~: ::: :~ : ~ j il:: :'~': ':[~:::::: [' :Il ':l:l:[:::~: ~::~ ~I ~:{'{{[~[~'~ :~ :::[::[l~ J:' I lJ JllJ J I : [l:: :J:l]: lJl:' :l 'Jill :: I {] ~J :i J J I [II J [~:: ~ ~ J:' [1 Il: ~:': I [i:i:l [ ~{:~ ~l :': J [ J :: :l~ [1 :I [ } :l~l: }I~ :::::::::::::::::::::::::::::::::: ]j'l]l:J:~:[~:i~::::~ ~: [:.~ ~] ~::~ ~] ~ ~ ~':~ ~]~ ::~::~[ :: ~]~ ~ ]{~{ [~ ::~ [:i ~]i~ t ~ ~:'~] ~[~{]~ ~[::::~[ ~:: [:: ~{]: ~ ~{::~ ~ ]{~ ~ ~ [ ~{ [ ~ ~ :[ ~ ~ ~:i~ :[{ ~ ~{~ ~ ~[::{~]:: {~t [:[~]]~[]::]:: ~::~] }::~:] ] ] ::::]:: ~ ~ [:]: [:: ~ ~ [ [::] :: [:I ~ ~ t[[ {::~[~::~ ~[~ [:~{~]:: {{~]~::]] [~[ ~ ~l[~::::]]~]~ [}~[::::~[~]~]:~::] ~[[::::]~ []::[[::}~ [[]::[~[~ ~{~[~]::{~]~ ::::} ~ ~::~ 27'~7 2797. O0 2700. O0 2.97 S : 36.06 E O. 30 O. 01 "~' '-":'A'~ O0 3.92 S 37.21 E .. 0 01 2897 ~c~97. O0 ~ot u. . O. 3~ . KELLY BLISHING ELEV. = 97. C)O FT.. OPERATOR-MCGU I RE O. 01 0. (]).2 5. ~._ ..., ._-~. 14 'E O.o._~ 29'..--?.'/.. '.':'?T,"-.?7. (lO '.'."~OA 0~! , '-'.=; '.:; "-'- """--' ..... l 'i'i' I . i .................... ~ ..~ ........ ,, ....................... ~l....~(.,...:: ................................................................. ~.. ,, .......... ~ .......................... ~.... ~ ................................ .: ............ ~. .............. ~ .................................... ::i~!i!!ii::~[~!{ii!~(~i~%%~iy!.~}i~ ~"':":~:"'"?"'~ ~H (~f~:l:'::~':l:':'::iI i';';i~tf~i]::~:~':':':":!i~}}~},"~'j i!~ 3:3.97 33.97 .... O0 3300.00' 11 35 S 41 71 E 0 34'F~7 ._~4 ,~7. O0 3400. O0 1 '2.26 S 42.81 E 0.40 O. 02 O. 01 0.01 0 , '0 0 · ,. SF'ERRY-SUN WELL SURVEYING COMPANY F'AGE 7. , ~i~ ~:,:::: ~:::':~;~:'::!~L~'~':'::'::'::~:~'::~: '~'~ ': '::,~! :::"::~::~ ;~ ~ ~ :: ~ ~ :: :: :: ~ T ~ :: ~:: ': :: ~ ~ ~ ~ :: i i:: :: ~ :: ~ i~ ~ g': ~ ~ ~:. ~ ~ ~:: ~ ~ ::~ ~ ~ :.~ ! ~ :: ~ ~':~ ~ ~11 ~ ~ ~ ': ~ ~ :: :: :: ~ :::: :: :: :: ~ :: ~ ~:: ~ :: :: i :: ~ i::~ ~ ~:: ~ ~ ~ i :: 1 :: ~;~;~1~1~-~11~1~1~-~q~-~1~z~--~~ ....... ~~~2~:~~?~~;~`~~~;~~~B~'~1~ ............. },~ ............................................................................................ ::::::::::::::::::::::::::::::::: ........... ~.~%,..~i:.]...~,~ ......................................................................................... :~::.~:.:~, ALASKA , ~ KELLY BLISHING ELEV. = 97.00 FT. OPERATOR-MCGU I RE . ........ > ................................. +,.< ................. >.,.+..,..~ ...... , ...................... . ,. ,..,.....~ · . ......... , ....................................... < ................... . ....... ..~.,.... ............................................................................... . ..... ,.~. ,.,. ,., HE~SURED VERT I C~L VERT I C~L RECT~N6UL~R COORD I N~I'ES HD-T~D VE,RT I C~L DEPTH DEPTH DEPTH NORTH/SOUTH E~ST/WEST D I FFERENCE CORRECT I ON '.' ,:: · · .. ,:::,:,,.,:,.:,, ..~ ~ ~ .-,,.,, ............ t ............. :,,,,..,¥ :, ,:...:.. ::r: .::x:xx ;:: : :::,;';::::;::;:. ::: .: : ":,:..-,:::,,,;;;,;.,~ ......................... ,. ...... ~. ....... , ............ · ,.,, . · : ,,~. ~. ,.., ,, ............................ .................. ...... .. , 4105 · 40~7.00 4000.00 ~ 9.52 S 21.32 W 8.65 , 4.47' ,4212 41~7.00 4100.00 2.~0 N ~56'52 W 15.42 6.77 4322 4297.00 4200.00' 20.83 ~ ~.84 W , 25.8~ ' 10.47 ..... ~ ................. 4804 46~7.00 4600.00 135.41 N 342.00 W 107.~9 24.18 493O ..... 4797 00 4700 O0 168.28 N 40~.~4 W ,. 133.~7 '~ ~5.'~ ~'~"- 5056 4897 O0 '-"' . 4,~0.00 202.87 N 47~. 03 W ~59.64 26.37 ~,~.~.% ~.,.. >~> r.'-'::?.x~.~,<, '.-,-. · > :+x... ~ ~.~.x~ .......... ~.k~,-.-.~,~,,~.-....~.-.~... ~>~>~i~..~..~..x`:.:?~.~...:~...~.~.~x~x~>:~>~:~:>>~:.:ti~>~.~.~.`~..:.x~x.~.~?x~.~`¥i~:`>~:.:.:~..~x~.:.::.¥~.?..~..>:~?~.::~<~>~~: :.:*~:~:~i~i¥:~:~:::~:~::~:~:~:~:i::~.>>~¥~:~.~`%~.~..¥~x~:~::~:~:~:~:~T.~:~:~:::~:::~::~ :~::~:~ ~:~:~::':~:~::: .~:~:~ .- .... :~.~ · · ,>,.,..>> ........ ~..'..~. +, .. ...... ...,,- '...'..'.,..> ........ ~ ........ ,.... ........ -?..x,.,,.....'+.....-...~,...,....x-.+,... >. ,- .....................x.+,,.,., >.',, ...', +> x,,-<. ,.,.,,..., ,,- .......... · ,.-,...,.....,... ....... ..,, .... .,.., ................ ..........>,,, ,.. .......... ........ · ~,....., ...... ~., ~...... + < ......... ~,.,..,,>... ........ .,,,- ....... <,.> ....... :... ~ ....... .., ,.-... ,.,........ · ~...... . .......... ........ - ......... · ....., .. · · -..,. · . · _~ 6~ 52~7, 00 ._,~0.00 341 ,40 N 752, 40 W ~,~ ,57 24, 96 ~ o,:,~ 5397,00 5300, 00 373, 36 N 817, 18 W 286. ~3 ~,""~ 36 5806 5497. O0 5400. O0 404,36 N 881.02 W ~. 5~ 22, ~2 ~ ' .~ , .... ~ ~ , ..................... ~, .......................... =~..~ ........................ ALASKA MEASURED VERTICAL OEPTH DEPTH 6405 6,.=,22 5'.,~'77.00 / 6097. O0 ~ SPERRY-SUN WELL SURVEYING F:nMF'ANY ~ PAGE 8 · KELLY BUSHING ELE9, = '?7, O0 FT, OPERhTOR-~OGUI RE VERT I CAL RECTANGULAR COORD I NATES MD-'rVD VERT I _.AL DEPTH NORTH/SOLITH EAST/WEST D I FFERENCE CORRECT I ON ~. oo. O0 5.,-~. o'~l N 1175.29 W 6000.00 581.76 N 1228.14 W . ~ 6,./_.~ , 6,177, 00 6100. O0 609.71~ N 1280.12 W ~ 44~.. 48~ ~ ::::::::::::::::::::::::::::: :.::....~:' :::::::::::::::::::::: ..;:~.~ .. :;::: , :::::::::::::::::::::: :,:~. '.:..'::~:~.'. '..'~:~:::~::~<::::~:~:::~:~::~,:p:, :::~ '::~::::' '.' '::~:: ':::::::~:~:~:~:~;: ~: '.: ::~::: .: '::p; ::: :::::::::::::::::::::::::::::: : . ,x~.~' x~i; ~:~:x>¥x:mx: : ,:,:..; : . , +;.: ;, . .:. . .,. ?.:,: x, .x , . ............ ~...., ..., ~: ...... ....... ~+~..,+,~... ~ ........... c..<~.....+,.,~..~ ........... . ' ?-,: ...... ' ...... '.,.< ....... :..+.~ ..... . ...... -. ~ ....... . ........ :.¥~- ....... ~.+. .:...' .." .+ ........... ~+--:-c:-: ....... 7106 6597.00 6500.00 727, 68 N 14~2.05 W 50~. 2~ 7223 66~7.00 %600.00 757,31 N 1545.1S W 526.33 16.14 ~ , , 17.8©- ' 17.04 7339 6797.00 6700. OO Z86.71 ..N. ~ 1597.42 ~ 542.93 lA. ~,1 .... :::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::: ."' '~:: :~::~::::": ......... ~!:~:~:::::~;;:~:::: ' ";:" :::::::::::::::::::::::::::::::::::::::: :~::?:;"' ':' ':: ' ......... :: .... :'.:': :.~ :: ~ ~ ~'." :~'::'"":: ......... :~: ~' THE C:~LCLIL~TION P~OC:EDU~E~ U~E ~ LINE~ INTErPOLaTION DETHEEN THE NE~E~T 20 FOOT ~D ~F~OH ~DIUS OF OU~V~TU~E) PO INT~ 0 0 0 SPERRY-SUN WELL SURVEYING COMF'ANY PAGE --. '" ! -. - i."'.. :.' : i!i:Ei!i ::" ~ii"'!:'"':!H:i:ii"'i'"'"h:!x:'"::'""::'"",'~:""i': ':::p :"'::""'f"::"::::,':'"""'::"~'"" :::::::::::::::::::::::::::::::::::::::::::::: :!:::::i i!iiiii!ii!i:i:iiiii:!i!!:F::iii!iii!!:i"' :'~':"":" .... !"'"ii' '!ii ii! F'/-' re:i, ,.r %_ :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: !~D~:!~D~`~``.:~:~.~:~..~:~`~`~:~:.~:~:~:~:~`.~.::~:~c~`~;~:~:;~:~.~:~.~:~:~:~:~:~:~:~:~:~:~:~:~:~:.;~:~:~:~:~`~;~`~:~:~``~:~;~:~.~`..:~:~`,~:~:.~.::<.~:~:~:~:~:~:~:~:~:~:~:.~:~:~:~:~:~:.~:~:~:~:~:~:~:~:~:~:::~:~:~:~:~:~?~:~:~:~:~:~::~:~::~*~:~::::~::i~:~:D~;~:~:~:~:~:~::*::::~ ............ ~:::~::... ....................................................... l~:::~:::::::::~l~::!l~Hit~:D:~:::.:.:::~.:.~i~.~.~.ii ............ ~ ............................................... . ............................... ~LA:-';KA I<ELLY BU:_-';HI'NG ELEV. = '?7. AC) OPERATOR-MCOU I'RE ,, .~,..., ~,. ......... ,, ........... .,...~..,..:......,,.- ,.-... ,.x.,.,!., .. ,...,..:... :..~...,~.,, .×..,,; .-,.....~ ~.....:~.., ,,;., ,~.. ~....,~: .; .:.......:'~. ,:.~ .; ~.~:.~;..~:..,~.,.~.,.,:.:.,,;:~ ~ .:.;:.:..,:... ~..:,;. ,,.:~.. :.,...-. ~:: !.: :.: .;i :; :.i::~ :~.~::a. s ~::: ::: ~ ~."...~ ~:~Y..,'z:::~z F ;.::~::.'. :::.Y:; ::.~ f:: :::?~.'.::' '::t,: ~ :: ::..' :: :~ ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::: ::::: ::: :e.:: :.-,: .-.: :-,::: ::: ::: :~i: :..-:: i i: ::: .,.::: ii. :.,. ::i:: :!:: it. :i: ::~:i:~i i!:i'.::~ i~.-..: ::i~:~~~ ~~ :::::::::::::::::::::::: i !::q:i::!:h ::i:~ !::!!::!!: ::h:~::~!:::.~;::~:: ~:~:.':::~: .... ~: :: ...!:::~::.,:::~:::.'.~::: MEASLIRED VERTICAL VERTICAL : RECTANGULAR COORDINATES DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST MARKER 7..'=0 6745.5~ 6648.58 771 59 N 1570 59 W BASE LOWER SAND 7300 6762 74 6665.74 776 63 N 1579 == . . .c,~, W SURVEY DEPTH , 7419 6o64. o..', ~-;,,767, = ~ ~(.}6.6~., N 16,..-,'-. ,.,2 W . F BTr' :!: ~:!: !:~:h:J:i ,'," ~ :_::..'~:~:~,i:! :~:~:!:!:~ :i:~: ~:":.] :J:!:J:i :~-~:i~i :!:~: 1:!~.:~:~ :];! :~:L:!: i: i:~:: :!:!:i.':.:i:~:i: ~:~:!: ~:~. !:~ .~':-! :~:~: iL:~:::i~.::]:~:~-~:i:~: i:::i: '~: i:.:; i:~:! ::: :",{: i:i: i: .c~::~:::i:i: :: i:i: i:}: ~:!:i~'~.'~:~:!:i :: ':::::: :t:i::$:: :; :::¥ ~L':::::::~::;i:: ;~,:.':'-:': :."~f.' .': :~:: ::::.'.-:::.~'.: ~ ~::L-:::: ::: :':::::.::: ~ :::_::::::::::;::: :::::: :: ::::.:::::::: :: :,:: :..:::::::: :.' :: :: ::::: ~::L': :::: ::.:::.":: :;: :: ::::.':.::;:: ::: :::;: .::~< ::::::: :::::::::::::J:: :; t::: ::::::::::: ::: ::d: :: ;:::::::::::::::: :::::::::::::: :: :::::::::: :::: :::::::::. :. :::::::: :: :::::: ::::: :::: :: :i::-;:::;:: :t,':::::::, :%::. :::':::::: :::::.:. :.:. :: :. :% :.:, :;:-:. g+:::;:.:. :. r, :.:,:. :. :::?.,. :.:-; :,:.. ::. :, :. :::, :: :-:. ;, :u: :.:.;.;.,.b,,:; J.;,: ;:.. :,, .::< :.~,:p;:::: .:;: .d.; d 0 0 0 TOP UF'F'ER SAND BASE UF'PER SAND 7006 6511.84 6414.84 TOP LOWER S;~ND 71E;5 , 4644. ~_ 7 4547.17 TOTAL DEPTH DRZLLER 7533 6~62, DATE OF SURVEY NOVEMBER COMF'UTATI ON DATE ~:~/~;?~:~F?~:~:~:~?~?~?~::~?~?~:~?:~:~:~:~:~H~H:~:~:::?~8~?]~~~:~:~ ~ ~ .~~ ~ ~*~'~g~~~!~?¢~?~;:~?.'~:':':': ........ :~ .......... ~ .............. ~ ........... :~:'~*~:~:~:~?"'::~'~:~'~'~?~: ARO0 Alaska, Inc. Our ~oss Gyroscopic Survey Job No. AK-BO-30123 Well: ~lG-15 (S~C 29 T12N R10E) Ku .pa~uk Field North Slope, Alaska Survey Date: November 13, 1983 Operator: McGuire Scale: 1" = 500' -20~0. O0 TRUE NORTH 7533 HOR IZONTfqL -500. O0 ~%~r face Location 309 FSL 441 ~L -SO0. O0 PROJECTION O. O0 2000.00 4000.00 6QO0. O0 0000.00 75~ 1879.70 @ N 63° 36'W :,Oho. oo ARCO Alaska, Inc. Our Boss Gyroscopic Survey Job No. AK-BO-30123 Well: ~lG-15 (SEC 29 T12N R10E) Kuparuk Field North Slope, Alaska Survey Date: November 13, 1983 Operator: McGui~ Scale: 1" = 2000' VER T I CRL PROJE C T I ON Suggested form to ke inserted in each "Active" well folder to d~.eck for timely compliance with our regulations. ouerator, W.~ 1 Nam~ ahd Number . Reports and Materials to be received by: ~_- /~ Date Required Date Received Remarks Comp letion Re~ort Yes .Well_~_ History Yes -. _Samples _ .~v .... /? i ~/,,,-" Mud Log /!: 1'_. />: ~ ...... ~,.- /. ~re ~~ ' -' ,~:'"'"":::~"- ~.' ~. .~ ,,'~/.~ Core Description _.________~_ ., ~x.,: 4,-'.'~' Registered Survey Plat ~ , ~ , L~ ,_ ~.-.x- ..>~ , Inclination Survey .,, ~ ..~ Directi°nal Survey ,/':.._..:;..K: Drill Stem Test Reports ,,~/~ :~;A.~._~ ~/...,. Pr~d~ctibn Test ~eports ~,,/ ' ' ' /~-~ ,;,}-.'-:.-,:.-~,~--;:- , ~,,,~.. Logs Run. Yes ,. ? ..... ~ , 'i ~. --:,,:' _, .,: .... . Digitized Data ~>'~,.u> .:"'? .:,' -;~ .... / / ARCO Alaska, Inc. Post Office b,.,~ 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 26, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation 3001 Porcupine Drive Anchorage, AK 99501 Commission Dear Mr. Chatterton' Attached is a notice of intention regarding of Kuparuk well 1G-15. If you have any questions, please call me at Coordinator C KH / kmc Attachment (In Triplicate) acid treatment 263-4527. RECEIVED JAN 2, 61984 A~..,,,,,-Oil & Gas Coils. C0mmis;io~ i~1~ Ar.~,hcra.go ARCO Alaska, Inc, is a subsidiary of AtlanticRichfieldCornpany SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. ARCO ALASKA, INC. 3. ddn,ss I~o- 029-2z02~ P. O. BOX 100360, ANCHORAGE/ ALASKA 99510 4. ocalion )t ~'ell SURFACE LOCATION: 309' FSL, 441' FWL, SEC. 29 ~ K PAR K /'~. Well Number T12N, R10E, UN / 1~- 1:~ I KUPA UK RZVE FZEL 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. / KUPARUK RfVER O! 97' CRKB) ADL 25640; Al K 2571 / 2. Name of Operator 3. Address 4. Location of Well 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate ~ Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Well is perforated in "C" sand only and is incapable of flowing to the CPF. Proposal is to acidize the "C" sand with 12% HCL containing mud silt removers. The treatment incorporates the use of a coiled tubing unit, and nitrogen to aid in the acid cleanup. and Fluid Requirement' 12% HCL 4368 Gals Nitrogen 3000 Gals Diesel 2520 Gals Expected Start Date' 1/27/84 RECEIVED JAN 2 s 1984 0il ~, Gas Cc:is. Com., 14. I hereby certify~that the foregoing is true and correct to the best of my knowledge. Signed ~,~~~--~'~'~ ~--' ' ~"/1~¢''~u/'~l~' Title K u P A R u K The space below~l/Commissio tl~ OPERAT IONS COORDINATOR Da~e Conditions of Approval, if any: ARCO Approved by Approved Copy Returned · By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc./ Post Office b,.x 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 January 19, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1G-15 Dear Mr. Chatterton: Enclosed is a Subsequent Sundry Report for the subject well. you have any questions, please call me at 263-4944. Sincerely, ' Gruber Associate Engineer GRU5/L131:tw Enclosure If ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany . - .... STATE OF ALASKA ALASKA _. ~L AND GAS CONSERVATION Ct .,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [~X OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-148 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21024 4. Location of Well Surface: 309' FSL, 441' FWL, Sec.29, T12N, RIOE, UH 5. Elevationinfeet(indicate KB, DF, etc.) 97' RKB 6. Lease Designation and Serial No. ADL 25640 ALK 2571 9. Unit or Lease Name Kuparuk River Unit 10. Well Number 16-15 11. Field and Pool Kuparuk River Fi eld Kuparuk River Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). RU Dresser-Atlas. Ran CBL/GR/CCL f/7356' 1800'. Ran Gyro. RD Dresser-Atlas. Secured well. Accepted rig ~ 1230 hfs, 01/06/84. ND lower tree assy. NU BOPE & tstd to 3000 psi- ok. TIH w/tbg-conveyed perforating guns. Ran CCL/GR. Set "Champ" pkr. Tstd ann to 1000 psi - ok. Disp tbg w/crude oil & diesel. Closed bypass. Put 1000 psi on backside of "Champ" pkr. Dropped perf bar & perforated the following intervals w/12 spf, 120° phasing: 6834' - 6838' 6843' - 6880' 6890' - 6895' 6954' - 7007' Flowed well to cleanup. SI. Opened bypass & unseated pkr. Reverse circ tbg w/8.8 ppg brine. RIH w/6" gauge ring & JB to 7373'; TOH. TIH w/WD pkr & tail & set pkr ~ 7085'. Ran 3-1/2" completion assembly. Tstd hanger to 5000 psi - ok. Tstd packoff to 3000 psi - ok. Set pkr. Tstd 3-1/2" x 7" annulus to 2000 psi - ok. Set BPV. ND BOPE. NU tree. Pulled BPV. .Set test plug. Tstd tree to 3000 psi - ok. Pulled test plug. Pulled "C" lock in SSSV. Pulled dummy in GLM #8 @ 6605'. Disp w/30 bbls diesel followed by 180 bbls crude. RIH to set dummy in GLM #8; set in pocket - sheared off - unable to go below pocket w/KO tool; POH. (Left bottom section of running tool on dummy - approx. 5' long x 1-1/4" OD) Press. up tbg - found communication t( annulus - dummy not set. RIH w/2.625" GR; unable to go below pocket. (see attached sheet) 14. I hereby cer~fy that the foregoing is true and correct to the best of my knowledge. Signed . ~ v - The spac e'b~ ~o~/m~ssio n ~se Conditio/'s of Appr~al, if any: Approved by. Form 10-403 Rev. 7-1-80 GRUS/SN74 COMMISSIONER the Com~ssion .,, Submit "Intentions" in Triplicate and "Subsequent Reporls" in Duplicate 1G-15 RIH w/impression block. RIH w/overshot. POH - fish not recovered. Disp well to 8.8 ppg. Circ to balance system. Set BPV. ND tree. NU BOPE & tstd - ok. Sheared PBR & POH w/3-1/2" compl, assy (GLM #8 was missing dummy). RIH w/impression block to 6650' (top of slick stick); no obstruction. RIH w/SBR barrel & 8 GLMs w/dummies on 3-1/2" tbg. Went over slick stick & landed on hgr. Tstd packoff to 3000 psi - ok. Tstd tbg to 3000 psi - ok. Tstd ann to 2000 psi - ok. Set BPV. ND BOPE. NU tree & tstd to 3000 psi - ok. Pulled "C" lock in SSSV. Pulled dummy in GLM #8 ~ 6605'. Disp well w/Kuparuk crude & diesel. Reset dummy. Tstd tbg to 3000 psi - ok. Installed BPV. Secured well & released rig ~ 0730 hfs, 01/13/84. KUPARUK ENGINEERING TRANSMITTAL # .2-7 7'~ DATE' /, ~. ~z// WELL NAME' D. Fay Allison Transmitted herewith are the following- PLEASE NOTE' ~)- BLUELINE<~ SEPIA, F - FILM, T - TAPE, PC - PHOTOCOPY ~PT ACKNOWLEDGED: PLEASE RETURN RECEIPI TO' ARCO ALASKA, INC. ATTN: D. FAY ALLISON - ATO/1115-B P. O. BOX 100360 ANCHORAGE, AK. 99510 ARCO Alaska, Inc. Post Office B(.,._ _,60 Anchorage, Alaska 99510 Telephone 907 277 5637 January 5, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation 3001 Porcupine Drive Anchorage, AK 99501 Commission Dear Mr. Chatterton' Attached are sundry notices for wells' 1G-9 1G-9 1G-10 1G-11 1G-12 1G-13 1G-14 1G-15 1G-16 fracture ~erforate ~erforate ~erforate ~erforate ~erforate ~erforate ~erforate ~erforate action on the following If you have any questions, please call Charles K. House .Kuparuk Operations Coordinator CKH/kmc Attachment (In Triplicate) me at 263-4527. ~RCO Alas~-.~ ir:c. ~$ R subsfd~ary of AtlanticRichHeldCompany STATE OF ALASKA ~' ALASKA L~L AND GAS CONSERVATION CO~v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER Ej~ 2. Name of Operator 7. Permit No. ARCO ALASKA, INC. 83-148 3. Address 8. APl Number P. O. BOX 100360, ANCHORAGE, ALASKA 99510 50-029-21024 9. Unit or Lease Name 29 KUPARUK RIVER UNIT 4. Location of Well SURFACE LOCATION' T12N, R10E, 309' FSL, 441' FWL, SEC. UM 5. Elevation in feet (indicate KB, DF, etc.) 97' 12. I 6. Lease Designation and Serial No. 10. Well Number 1G-15 11. Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL (RKB) ADL 25640; ALK 2571 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate )~] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate the following depths in the Kuparuk "A" sand: 7203 - 7215'. All perforating will be conducted with 4 SPF through-tubing guns. A 3000 psi lubricator will be used on all wireline work. Lubricator will be pressure tested prior to doing the work. All circulated and flowed fluids will be diverted to tankage on location. Expected start date ' 14. I hereby certj~y t/hat the foregoing is true and correct to the best of my knowledge. Signed ./":~:~/:~ ~ '~L,_ /-</~'~)v_L-~~ Title KUPARUK ~' ~ ' OPERATIONS COORDINATOR The space below for Commission use Date Conditions of Approval, if any: Approved by COMMISSIONER ^pproved Copy Returned By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate 1G-15 COMPLETION SUMMARY RU Dresser-Atlas. Ran CBL/GR/CCL f/7356' - ].800'. Dresser-Atlas. Secured well. Ran Gyro. RD Accepted rig @ 1230 hrs, 01/06/84. ND lower tree assy. NU BOPE & tstd to 3000 psi - ok. TIH w/tbg - conveyed perforating guns. Ran CCL/GR. Set "Champ" pkr. Tstd ann to 1000 psi - ok. Disp tbg w/crude oil & diesel. Closed bypass. Put 1000 psi on backside of "Champ" pkr. Dropped perf bar & perforated the following intervals w/12 spf, 120° phasing: 6834' - 6838' 6843' - 6880' 6890' - 6895' 6954' - 7007' Flowed well to clean up. SI. Opened bypass & unseated pkr. Reverse circ tbg w/8.8 ppg brine. RIH w/6" gauge ring & JB to 7373'; TOH. TIH w/WD pkr & tail & set pkr @ 7085'. Ran 3-1/2" completion assembly w/tail @ 7105, pkr @ 6670' & SSSV @ 1893' Tstd hanger to 5000 psi - ok. Tstd packoff to 3000 psi - ok. Set pkr. ~std 3-1/2" x 7" annulus to 2000 psi - ok. Set BPV. ND BOPE. NU tree. Pulled BPV. Set test plug. Tstd tree to 3000 psi - ok. Pulled test plug. Pulled "C" lock in SSSV. Pulled dummy in GLM #8 @ 6605'. Disp w/30 bbls diesel followed by 180 bbls crude. RIH to set dummy in GLM #8; set in pocket - sheared off - unable to go below pocket w/KO tool; POH. (Left bottom section of running tool on dummy - approx 5' long x 1-1/4" OD) Press. up tbg - found communication to annulus - dummy not set. RIH w/2.625" GR; unable to go below pocket. RIH w/impression block. RIH w/overshot. POH - fish not recovered. Disp well to 8.8 ppg brine. Circ to balance system. Set BPV. ND tree. NU BOPE & tstd - ok. Sheared PBR & POH w/3-1/2" compl, assy. (GLM #8 was missing dummy). RIH w/impression block to 6650'; (top of slick stick) no obstruction. RIH w/SBR barrel & 8 GLMs w/dummies on 3-1/2" tbg. Went over slick stick & landed on hgr. Tstd packoff to 3000 psi - ok. Tstd tbg to 3000 psi - ok. Tstd ann to 2000 psi - ok. Set BPV. ND BOPE. NU tree & tstd to 3000 psi - ok. Pulled "C" lock in SSSV. Pulled dummy in GLM #8 @' 6605'. Disp well w/Kuparuk crude & diesel. Reset dummy. Tstd tbg to 3000 psi - ok. Installed BPV. Secured well & released rig @ 0730 hrs, 01/13/84. GRU5/CS13:tw 1G-15 DRILLING HISTORY NU 20" Hydril & diverter. Spudded well 0 0630 hfs, 10/21/83. Drld 13-1/2" hole to 2240'. Circ & condition hole. Ran 56 jts 10-3/4" 45.5 + 55.5# HFERW and L-80 BTC csg w~shoe 0 2200'. Cmtd 10-3/4" csg w/1100 sx Permafrost "E" & 250 sx Permafrost "C". Bumped plug w/1500 psi . Floats held - ok. ND 20" hydril and diverter. Instld 10-3/4" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 3000 psi - ok. Tstd' csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drid FS & 10' new form. Tstd form to 11.1 ppg EMW - ok. Cont drlg 8-1/2" hole to 7533'TD as of 10/26/83. Ran logs DIL/SFL/FDC/CNL/GR/CAL f/7533' to 2202'. Ran RFT. Circ & cond hole. Ran 189 jts 7" 26# J-55 BTC csg w/shoe 07502. Cmt 7" csg w/750 sx cl ass G". Instld 7" pack-off & tstd to 2000 - ok. Displ brine from top 450' of well. ND BOP. NU tree. Perform arctic pack using 250 sx Permafrost "C" and 94 bbls arctic pack. Secure well and released rig 01000 hfs on 10/29/83. H I LL/DH52 11/16/83 1G-15 RFT RESULTS Depth 6838 6833 6989 7000 6991 7195 7205 7213 6961 6853 Hydro. Pressure (psi) 3342 3327 3393 3396 3392 3476 3482 3484 3380 3332 Shut-In Pressure(psi) Tight 2663 2637 2638 2641 Tight 3157 3165 2624 2636 GPAD/1G-15:tw KUP4~JK F>,E; i NEERI KG TRA,NSMITFAL # ~.6~.- TO: DATE: H'43V,: D.W. Bose/Shelby J. · WELL /~¢~\;:~E: ~ ~ ' Transmitted herewith are the roi Ic~,vin<3' · PLEASE NOTE- BL - BLUELI NE, S - SEPIA, F - F I hA, T - TAPE, PC - PdCKOODPY . ~Jq-- I I ~ Cz; lZFo~3 o/// / o..¢~, 2'~ .~/CEI PT ,AC. KNOt¢ g"GFD: · ,~LEASE P.E-RJI~N REC. E I PT TO: · ::::::::::::::::::::::: , · .... ' : ' ,: :' . :'...:,. . ._ . . . ..... ., · . ARCO ~.laska, Inc.. Post Office b~,< 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 November 18, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Enclosed are the Monthly State Reports for the following wells: 1F-13 1G-12 1F-14 1G-13 1F-15 1G-14 1F-16 1G-15 1G-16 Thank you. Sincerely, JBK/SH1: ih ARCO Alaska, Inc. is a Subsidiary of AtlanticRichiieldCompany " ~ STATE OF ALASKA ALASKA ~ _ AND GAS CONSERVATION CC MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS¢ '- 1. Drilling well E~X Workover operation [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of Well 309' FSL, 441' FWL, Sec. at surface 29, T12N, RIOE, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. PAD 61' 97' RKB ADL 25640 ALK 2571 7. Permit No. 83-148 8. APl Number 029-21024 50-- 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 1G-15 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool For the Month of October ,1983 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well (~ 0630 hfs, 10/21/83. Drld 13-1/2" hole to 2240'. Ran, cmtd, & tstd 10-3/4" csg. Cont drlg 8½" hole to 7533' TD. Ran logs, ran RFT. Ran, cmtd & tstd 7" csg. Displ brine from top 450' of well, performed arctic pack. Secured well & released rig @ 1000 hfs, 10/29/83. 13. Casing or liner run and quantities of cement, results of pressure tests 10-3/4" 45.5# HFERW J-55 + 55.5# L-80 BTC csg w/shoe (~ 2200'. Cmtd w/1100 sx Permafrost "E" & 250 sx Permafrost "C". 7" 26# J-55 BTC csg w/shoe (~ 7502'. Cmtd w/750 sx Class II ~I! · 14. Coring resume and brief description N/A 15. Logs run and depth where run DIL/SFL/FDC/CNL/GR/SP/CAL f/7533' to 2202'. Ran RFT (results to follow on completion report). I 6. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 'SIGNED/ ~'//.~./~~----¢--'~~~ TITLE Area DPJ 1. ! ~.n.'g EngJneerDATE ///~'~~led ~/n NOTE--Rape orC'th'i/~rm is required for each calendar month, regardless of the status of operations, and must be duplicate with the Alaska Oil and GaF/Conserva~Fon Commission by the 15th of the succeeding month, unless otherwise directed. Form 10404 Submit in duplicate 1G-15 DRILLING HISTORY NU 20" Hydril & diverter. Spudded well ~ 0630 hrs, 10/21/83. Drld 13-1/2" hole to 2240'. Circ& condition hole. Ran 56 jts 10-3/4" 45.5 + 55.5# HFERW and L-80 BTC csg w/shoe @ 2200'. Cmtd 10-3/4" csg w/llO0 sx Permafrost "E" & 250 sx Permafrost "C". Bumped plug w/1500 psi . Floats held - ok. ND 20" hydril and diverter. Instld 10-3/4" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 3000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drid FS & 10' new form. Tstd form to 11.1 ppg EMW - ok. Cont drlg 8-1/2" hole to 7533'TD as of 10/26/83. Ran logs DIL/SFL/FDC/CNL/GR/CAL f/7533' to 2202'. Ran RFT. Circ & cond hole. Ran 189 jts 7" 26# J-55 BTC csg w/shoe @7502. Cmt 7" csg w/750 sx class G". Instld 7" pack-off & tstd to 2000 - ok. Displ brine from top 450' of well. ND BOP. NU tree. Perform arctic pack using 250 sx Permafrost "C" and 94 bbls arctic pack. Secure well and released rig @1000 hfs on 10/29/83. H I LL/DH52 11/16/83 MEM.ORANDUM TO: State of Alaska A ~LASFd% OIL A/~.D GAS CONSERVATION COMMISSION THRU: Lor~ie C. Smith Commissioner DATE: FILE NO: TELEPHONE NO: October 27, 1983 10SA:N1 FROm: Harold Ro Hawkins .~/.~.~__~ SUSJECT: Petroleum Inspector Witness BOPE Test on ARCO ' s . Kuparuk 1G-15, Sec. 29, T12~,kl0E,U.~. Permit No.. 83-148. Saturday, OC~ tober 22, 1983: I left my house at 6:00 Ma for a 6:30 am cheCk in at Alaska Airlines for a departure to Deadhorse at 7:30 a~n. I arrived at ARCO's Kuparuk Field on Pad 1G-15 at 10: 30 am. ~. I witnessed the BOPE test's on ARCO's Kuparuk lC-15. There were no failures. I filled out an A.O.G.C.C. report which is attached. In summary, I witnessed the BOPE test that Doyan 9 performed for ARCO on Well 1C---15. ~ The tests were satisfactory. Attachment 02-00IA(Rev. 10/79) ' O&G ,~ 4 4/80 STATE OF AI,ASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.-E. Inspection Report Inspector Date kiel 1 Operator Well / Location: Sec Drilling Contractor Rig # ~ Representative Permit # ~-~' .., ~--:; Casing Set Location, General Well Sign .. General Housekeeping Reserve pit Rig BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve ACCUt. IU LATO R S'YSTEt. I Full Charge Pressure ~.~co o l)s.ig· Pressure After Closure /7'(~ ,9 psig 200 psig Above Precharge Attained: --, min~:'_/J. _ sec Full Charge Pressure Attained: D min~'~ sec Controls: Master ~;/~ Rcmo~D C5 (:' _2~inds switch cover ~j~' Kelly and Floor Safe~.y valves - Test Results: Failures Repair or Replacement of failed equipment to be made within Inspector/Com,~uission office notified. r~ ~... ~ .~ ~ff~ nemarks: I/?'-/~:/ ''? ~,~- ,.f~ ,f Z> 3:~ ,:-%1 Upper Kelly Lower Kelly Ball Type Inside BOP Choke Manifold NO, Valves / z? No. 'flanges ~/f?~ - ' Adjustable Chokes.,"'"',, ' llydrauically operated choke Test Time hrs, Test Pressure .;-.: Test Pressure ~?.-:2' Test Pressure ,.5' Test Pressure Test Pressure days and'"" Distribution orig,' - AO&GCC cc - Operator cc - Supervisor Inspector ARCO Alaska, Inc.~ Post Office b,.,x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 October 3, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' 1G-15 Dear Mr. Chatterton' Enclosed is a Sundry Notice for the subject well. We propose to complete this well with our workover rig. Since we expect to start this work on November 25, 1983, your earliest approval will be appreciated. If you have any questions, please call me at 263-4970. Sincerely, ~ ~.~~a. Dri/lq ing Engi ne~er.. JBK/GRU4L81- tw Enclosures ARCO Alaska. Inc, is a subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA ,L AND GAS CONSERVATION C~ iMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER I~X 2. Name of Operator 7, Permit No. ARCO Alaska, Inc. 83-148 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21024 4. Location of Well Surface: 309' FSL, 441' FWL, Sec.29, T12N, RIOE, UM 5. Elevation in feet (indicate KB, DF, etc.) 97' RKB · 12. 6. Lease Designation and Serial No. ADL 25640 ALK 2571 9. Unit or Lease Name Kuparuk River Unit 10. Well Number 1(:;-15 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other ~X Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonmentsee20 AAC 25.105-170). ARCO Alaska, Inc., proposes to complete this well with the Westward Well Service Rig #1. The procedure will be as follows: 1) A mast truck will be utilized to run the CBL/VDL/GR and Gyro. 2) The rig will be moved on location; the BOrE will be nippled up and tested. 3) Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. 4) The well will be completed with 3-1/2", 9.2 #/ft, J-55, BTC tubing. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. The BOP equipment will be pressure tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. Thei subsurface safety valve will be installed and tested upon conclusion of the job. Estimated start: November 25, 1983 Alaska Oil & L;,as Cons. C0mlnissiun ,&nch0ra.~e 14. I hereby c/e¢~¥ that the foregoing is tr~lae and correct to the best of my knowledge. // ' Area Drilling Engineer Signed L / Title ission use Condition/yof App~fl, if ~ Date Approved by COMMISSIONER Approved Copy Returned By Order of the Commission Form 10-403 Rev. 7-1oSO GRU4/SN41 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate 29, 19~3 ~r. Jeffrey ~. Kewin Senior Drilling ~ngineer A~.CO Alaska, inc. P. O. Box 100360 ~chorage, Alaska 99510 Re: Kuparuk River Unit 1G-15 ARCO Alaska, Inc. Permit No. 83-148 Sur. -Loc. 309'FSL, 441'FWL, Se¢.29, T12~, RiOE, Bric-,hole Loc. 1354'FSL, 1516'FEL, $ec.30, T12~., R10E, Dear Mr. Kewin~ ~nclose~ is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required, samples of well cuttings and a mud log are not required. A continuous directional surve2 is required as ~r 20 AAC 25.050(b)(5}. If available, a ta~.e containing the digitized lo9 information shall be submitted on all logs for copying except experimental logs, velocity surveys and di~,eter surveys. ~a~ rivers'in Alaska and their drainage systems have been classified as important for the spa~ing or migration of anadr~ous fish. O~erations in these areas are ~ubject to AS 16.05.870 and the regulations prc~ulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations k~u~ may be contacted by tt~e ~iabitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article ? and the re~ulatlons promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Pederal Water Pollution Control Act, as amended. Prior to commencing operations you nay be contacted by a representative of the Depart~ent of tlnviroD~entai Conservation. ~ aid us in s~eduling field work, please notify this office 24 ho~-~s prior tO co~--~meneing installation o~ the blowout Mr. Jeffrey B. Ke.xn Euparuk River Unit 1G-15 -2- September 29, 1983 prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing Shoe is drilled. Where a diverter system is re~quired, please also notify this office 24 hours prior to c~mencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pip~. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. trul ,3mu ? C. V. Chatterton / ~y .OBD~R ~ TH~ .~em~ss:o~ ~ai r~n of AlaS~ Oil ~d Gas Conse~ation Commission lc: 6:H/A Enclosure cc: Department of Fish & Game, 5abitat Section w/o encl. Department of Environ~ntaI Conservation w/o encl. ARCO Alaska, Inc. Post Office Bo,, 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 19, 1983 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Kuparuk 1G-15 Dear Mr. Chatterton- Enclosed are' ° An application for Permit to Drill Kuparuk 1G-15, a $100 application fee. o A diagram showing the proposed horizontal and projections of the wellbore. o A proximity plat. o A diagram and description of the surface hole system. ° A diagram and description of the BOP equipment. Since we estimate spudding this well on October 11, earliest approval will be appreciated. If you have any questions, please call me at 263-4970. Sincerely, A~ea/Drilling Engineer JBK/JG4L56' tw ~!~ ~, ~.~...: ~ .~ .- ,,. ,?~ ..,, ~; ~j,:. :... Attachments al ong wi th vertical diverter 1983, your ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany la. Type of work. 2. Name of operator STATE OF ALASKA ALASKA O,- AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL IX)( DEVELOPMENT GAS [] SERVICE [] STRAT!:~RAPHIC L_~ SINGLE ZONE [~X ~'" MULTIPLE ZONE [] ~_,. ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 309' FSL, 441' FWL, Sec.29, T12N, RIOE, UM At top of proposed producing interval 1127' FSL, 1091' FEL, Sec. 30, T12N, RIOE, UM At total depth 1354' FSL, 1516' FEL, Sec. 30, T12N, RIOE, UM 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 97', PAD 61' ADL 25640 ALK 2571 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 9. Unit or lease name Kuparuk River Unit 10. Well number 1G-15 11. Field and pool Kuparuk River Fi eld Kuparuk River Oil Pool Amount $500,000 13. Distance and direction from nearest town 30 mi. NW of Deadhorse 16. Proposed depth(MD & TVD) 7686' ND, 6935' TVD 19. If deviated (see 20 AAC 25.050) KICK OFF POINT 3600 feet. 21. SIZE Hole Casing Weight ~4" 16" 65# ~3-1/2" 10-3/4" 45.5# ~13-1/2" 10-3/4" 55.5# 8-1/2" 7" 26# 22. Describe proposed program: 14. Distance to nearest property or lease line m il es 3754 ' feet 17. Number of acres in lease feet 2459+ 20. Anticipated pressures MAXIMUM HOLE ANGLE 40 o (see 20AAC25.035(c) (2) Proposed Casing, Liner an'd Cementing Program CASING AND LINER Grade Coupling Length H-40 J We 1 d 80 ' J-55/HF-E~W BTC 1765' L-80 / BTC I 400' J-S / HF-E W / I SETTING DEPTH MD TOP TVD 36' I 36' I 35' 35' I 1800' 11800' I 33' I 33' I15. Distance to nearest drilling or completed 11G-14 well 60' ~ surface feet I18. Approximate spud date [ 10/11/83 MD BOTTOM TVD 116'11 116' 1800'11800' 2200' I 2200' 2706 psig@_~0°F Surface 3159 psig@ 67R2 ft. TD (TVD) 7686'16935' I I QUANTITY OF CEMENT (include stage data) + 250 cf 950 sx Arctic Set IV & 250 sx Arctic Set I 400 sx Class G extended 350 sx Class G neat Est. TOC= 2200' ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 7686' MD (6935' TVD}. Selected intervals will be logged. A 20", 2000 psi annular diverter will be installed on the 16" conductor while drilling the surface hole. A 13-5/8", 5000 psi, RSRRA BOPE stack will be installed on the 10-3/4" surface pipe. It will be tested upon installation and weekly thereafter. Test pressure will be 3000 psig (1800 psi for annular). Expected maximum surface pressure is 2706 psig. Pressure calculations are based on current reservoir pressure. Surface pressure calculated with unexpanded gas bubble at surface including temperature effects. The cement will be brought 500' above the top of the shallowest hydrocarbon zone or to the 10-3/4" shoe. Casing will be tested to 2000 psi prior to releasing the drilling rig. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. Completion operations with the workover rig will be covered under a separate sundry notice. 1G-15 will be 60' away from 1G-14 at the surface. There are no closer wellbores anywhere downhole. Reserve pit fluids will be disposed of by pumping them down the 7" x 10-3/4" annulus of this well. The 7" x 10-3/4" annulus_ will be left with a non-freezing fluid during an interruptions/~n// ,//-/~,~ --/~, ---- ~ th~dispos/8~p~/~ss.. DATE The spacebelo~r~o~o~se ''/~~' ----~ ~v CONDITIONS OF APPROVAL Samples required I~YES ~O Permit number APPROVED Form 10401 Mud Icg required [ Directional Survey required ] APl_number I--lYES E~O I ~ o I Approval date /q & ~-,~9J.2,9/83 . _ GRU4/PD15 SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE Sept6~ber 29, 1983 by order of the Commission Submit in triplicate ~ ~ ~ ~ ~ · : . ; :'' ~ [ ~ ..... ~, I i [ ', ~f~ if-s! i i ~ ~ , ' i ' ' , f : , , "" i "" 'lq ] i ) ! [ r t i. -- ~ ~ ~ ~ ~ : ..... - 7 . ' ----~ ~ T '~'~ : .... [ l ~ ~,,~ , ~ .... ~, ,,~ ,, TT:~::'ii~ i : i le~ ~'~l~~~~-, ~;__,,,, a, ; , ~ i i ] ,: [,~- i [~'i"');' : ~ ' ~ i ~,- ~ Li ~ ' , -- , ; ', i i i . ~ : : [ : ;_ _ : ~ ' ; : ~ . ~ ~ ; ~ , ~ , : . . [ . ; ...... i~ ~ .... i .... ' i i : -® Q. Surface Divertg..r Ssstem · x~ 1. 16" Bradenhead. 2. 16" x'20" 2000 psi double studded adapter. 3. 20" 2000 psi drilli.~§ spool w/lO" side outlets. 4. 10" ball valves, h~aulically actuated, w/lO"b/ lines to reserve pit. Valves to open automati- cally upon closure of annular preventer. 5. 20" 2000 psi annular preventer. 6. 20" bell .nipple. 16" Conductor Maintenance & Operation ~- 1. Upon initial installation close annular I preventer and verify that ball valves I - have opened properly. . i 2. Close annular preventer and blow air ~_ . through diverter lines every 12 hours. t 3~ Close annular preventer in the event that gas or fluid flow to surface is 'detected. If necessary, manually over- ride and close ball valve to upwind -- di verter 1 i ne. Do not. shut i__o_n wel 1 under ~ circumstances. 13-~5~8" 5000 PSI '~RSRP~ BOP sTACK J -t RNNULRR PREVENTOR 9 ) ( .-- BL ! ND FLqHs P I PE RR,"IS ) 7 ( ) (_ ) ) ( P i P£ RR,'-iS ITBG HD 3 CSG HD 2 _. . -1 1. 16" Bradenhead 2. 16" 2000 PSI × i0= 3. 10" 3000 PS[ tubing ;aced 4. 10" 3000 PSi x 13-5/$' 5,SOO PSI adapter spool 5. 13-5/8" 5000 PSI pipe 6. 13-5/8"' 5000 PSI drill ing s-pool and kill lines . 13-5/8" 5000 PS! pipe ra~.s- .- 13-5/8" 5000 PST blind r~ -- 13-5/8" 5000'PSI anr~lar e w/choke . _ . . . ACCLC-IULATOR CA.~ACITT TF_ST - .. _ ~4ECIC ~",'D FILL ACC~-~-q_A.TOR L~'-VEt~ WITr( HYDRAULIC FLUID. A_SSUP, E THAT ACgI~m~O_ATO~. PP~C~.,E IS 2~ PSI I~ITH 1500 PSI ~J~TT-.~'4 O~3SEPJIE TI~IE TP~ C~E ~ L~;iTS S~T~- F~ OFF. L~IT IS 45 SE~N~ ~I~ TLME A~ l~ PSI P~NI)~ PP~SUP~. - 13-5/8" -COP STAT.( TEST FILL BOP STACK ~ I'g..,NL~-OLD S~[T'.~ ~%-"~6 D[-=.SEL. ~.'ECK lr~AT AIL HOLD ~"~'4 S~ 4--~__ FUM_Y P~_- TP..ACTED. PP~EDETE~-:II;2 DEPT-' T~T N'ILL SEAT Ah~ SEAT IN t~L;-~,aD. Cr~N SCP~S IN HEAD. CLOSE A;C'IULA2. PR~'~; ~FER AND C-:O.KES ~ ~=YPASS YALVES 0;( I-IANIFOLD. TEST ALL COM, PO;:E:FFS TO 2S0 .~SZ A~'O ~D FO-;~ lO MIt,UTES. INC, .-REASE PRESSUP.-~ TO~ A~(D NtDLD _;:0?, 10 MII;UTES. BLEED TO ~,0 FSI. OP-~'~-AJ-~'(ULA,R PP,~/~,--~, AI(D -D..~E T'31:'SET ~':" PIPE R.~4S. I,~;CR-EAS E m~S ~~ T0(~3C03 PS~)AND H~__D ,::02 lO CI_OSE VALVES DIRECTLf LF~Ti~'-!, OF ~J~. ' BLEED D,G,'NST- ~~,~"'P~-E~SL~ '1~' ZERO PSI i'0 i'T_S'T Y~'iYES. TEST PZ-LA!N~N.% UtFF._Si~-'EO_ TO Ps . - _ ' OP-~l TOP S~T OF PiPE RA-'~ A.'~.D ~'._ -~-_ INCEEASE PRESSU?,E TO 3G'OO PS! A,ND HOLD FO~ l0 H[!~JTES. BLEED TO Z~J3 2SI. ,, O2~J( BOTTO~ SE-F OF PIPE NI!;S JOINT A~iD PULL ~ RF~.'~S .~D TEST TO 3000 PSI F~ l0 ~I~:)-[l~. BLEED TO ZERO PSI. .~ ' SIIP. E HY~qIFOLD' ~u';D LI?~_S ARE F~u"J. ~= A2~-TIC - DIESEL A~;D ALL YALYES A2~ S'~ POSITIO¢I. - TEST ST~JDPIPE YALYES TO TEST KELLY COCXS A,qD I,'~II~= P..ECO.:~D TEST [NFO.~'~AT~Ck'I TEST FORt'-t SIG,'t ~D SF."~ TO ~-~TLLI~ ..~JPE~- .; ;."-,-2' "= · . ._ PHASE II /5 AS BUILT WELLS 9 thru 16 29 :32 NOTE:BASIS OF ELEV. IS TBM PER LHD 8~ ASSOC. PHASE ! EXISTING WELLS i thru 8 NOTE: 6 T. 12N ;RIOE. M. IAT MES. 1-- 6 SOUTH BASIS OF LOCATION IS MONUMENT' IG MIDDLE AND IG SOUTH AS SET BY L.H.D. 8~ ASSOC. LOCATED IN PROTRACTED SECTION 29, TOWN 12 N., RANGE IOE., UMIAT MERIDIAN. Th ~s Surve' 53 34 DRILL~'!TE I G CONDUCTOR A._ JUILT LOCATIONS WELL 9 Y: 5,981,093.188: X: 540~5~r-""8,976 444' FSL WELL I0 Y = 5,981,034.771 X 54.0,572_.i8 6 386' FSL Lat. 70021'33.3989" Long. ~149° 40' 14.036" 780 FWL WELL II Lot. 70°21'32.82-37'' Long. 149040' 13.660" 793' FWL y: 5,980,976.t30 Lat. 70°21'32.2462'' X = 540,585.500 Long. 149°40'13.279" I 327' FSL 806 FWL WELL 12 WELL 1:5 Y= 5,980,917.676 Lot. 70°21'31.6706'' X = 540,598.709 Long.,149°40'12.902" 268' FSL 818 FWL ~ - . y: 5,980,838.4.80 Lot. 70021'30.9103" X= 54.0,247.544 Long. 149°40'23-18;5'' 191' FSL 466' FWL WELL 14 y: 5,~80,896.919 Lat. 70°21'31.4858'' X= 540~234.224 Long. 14904-0'2-3.5643" 2_50' FSL 454' FWL WELL 15 '-'"Y = 5~980,955. 661 X= 540, Z2Q.882 :30 9' FS L WELL 6 Y: X = 540, 207. 93 I 367 FSL _ - - Lot.-/'0 °21 '32.0642." 149o40'2..3.9:44' Long. 441' F WL Lat. 70°21'32.6388" Long. 149°40'24.313'' 428' FWL I HEREBY CERTIFY T'HAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA, AND THAT Ti-tIS PLAT REPRESENTS A SURVEY MADE UNDER MY DIRECT SUPERVISION AND THAT ALL DETAILS ARE CORRECT AS OF: ii i ARCO Alaska, Inc. Kuoaruk Project DRILL SITE i-G CONDUCTOR AS BUILT LOCATIONS date' AUG 14., 198:3 scale' I": .~00' drawn by' E.H, dwg. no. '9.05.107.11d :ItECK LIST OR NEW WELL PERMITS (1) Fee /~'~" ~ thru 8) (3) Ad min/h~u 1 [1~' ~' ~'~, (4) Casg ~,~~ ~-~J'-~'J (12 thru 20) (5) BO PE :~'~~ ~'~F'~O' (21 thru 24) 3~ 4. 5. 6. 7. 8. 9~ 11. 12.~ 13. 14. 15. 16. 17. 18. 19. 20. 2'1, 22. 23. 24. 25. Compan~ . ~ /~f~{O ., .... ES' · · . · " the permit fee attached ......................................... Is well to be located in a defined .pool ............................ 'Is well located proper distance from property line ................. Is well located proper distance from' Other wells ................... Is sufficient undedicated acreage available in this pool ............ Is well to be deviated and is well bore plat included. ......iiiiiiiii~' Is operator the Only affected party ................ . ..... .. ... .. Can permit be approved before ten-day wait .~ .............. Lease & Well' No. Does .operator have "a bond in force ' . .... ' ......... '~l_~ Is a Conservation order needed, o'oooiiii~i2iio~ii'!2ii ii2~ioi2i~ii~i ~ Is administrative approval needed ..... REMARKS Is conductor string provided ................... , ..................... Is enough cement used to circulate on conductor and surface , ........ Will cement tie in surface and in'termediate .or production strings ... Will cement cover all known' productive horizons ..................... Will surface casing protect fresh wa~er zones ...... ' .................. Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedUre included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ....................................... ~ Are necessary diagrams of diverter and BOP equipment attached ....... ~ Does BOPE have sufficient pressure rating - Test to ~~ psig .. ~ DoeS the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements Additional Remarks: Geology: ~: ~K__~ LCS~BEW / / 'ev: 12/06/82 . INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simPlify finding information, information, of this nature is accumulated at the end of the file under APPENDIX,' .. No Special'effort has been made to chronologically organize this category of information. ,%¥ y") %,,,~ ,-. ,.fi. - .'?~' ~L.,'~,,~.~~ ,.~~.,"~ ' ,,~ .~ · ?m' mm ,?~ ~:~'~s:..,.~ . ..~,.~ :.. · ".'.~'... ~:~;. '...? 'P 010,)(02 VERI'~ICATION LI~TING PAG~ 1 NOTE ,VP OlO,H07 VERIFICATION LISTING PAGE 2 REEL HEADER *$ iERVICE NAME IRFT rONTZNUATION # ~REVIOU$ REE~ ~'~RVZCE NAME IRF? IEZGZN ICSU, ~ONTINUATION # "REV~OUS TAPE ~OMRE~T8 ~8CHLIJ~BERGER NELL SERVICE8 PROPRIETARY F~ELD TAP~ EOF FILE HEADER 'ILE ~A~E IRt? bo. OOl rERSZO~ # I 24,2 5 IAXIMU~ I~ENGTH 11024 'REVZOUS FTt,~ DATA FORMAT RECOR~ TYPE SiZE REPR CODE ENTRY I ! 66 0 2 1, 66 0 3 2 79 56 4 1 66 1 6 4 7 4' 65 INCH 8 4 73 6 9 4 65 lOCH 11 I 66 18 16 ! 66 1 0 0 66 O~DER # )EPT :TIM R~T OCKS UNIT AP1 APl APl', APl FILE SIZE SPL REPR FT O0 000 O0 0 0 4 $ 98636 21 0 ! 4 I,B 98 835 21 0 I 4 , , :,pmo,Czss , "(OCTAb) ! 68 O00000000000OO 1 6t~ 10000:000'000000 I 68 10000000000000 VP 010,N02 VERIFICATION LISTING PAGE SPE RFT RPS 9R 970 O1 0 ! 4 GP RFT P$IG g9 Ri4 O0 0 1 4 RES RFT P$IG 98 614 O0 0 I 4 PRE RFT PSIG 98 814 O0 0 1 4 Ol0 RFT 98 814 00 0 I 4 020 ~FT 98 814 00 0 I 4 ONE RFT 98 814 00 0 1 4 TEN RFT .98 8i4 00 0 1 4 · HUN RFT q8 814 O0 0 ! 4 'THO RFT 98 814 O0 0 I 4 IR Rr? GAPI 98 3i0 O0 0 1. 4' 1 68 10000000000000 1 68 10100000000000 1 68 t0000000000000 I 68 lO000000000000 1 68 10000000000000 1 68 10000000000000 1 68 10200000000000 1 68 10200000000000 1 68 10200000000000 1' 68 10200000000000 i 68 i0000000000000 DATA FORMAT RECORD :NTRY BLOCKS TYPE SIZE REPR CODE ENTRY 1 1 66 0 2 1 66 0 3 2 79 56 4 5 1 66 1 6 4 73 191, 7 4 65 INCH 8 4 73 6 5 I~CH 11 I 66 18 16 1 66 1 0 0 66 INEM SERVICE SERVICE UNIT APl AP1 AP! &PI FILE SIZE' SPb REPR PROCESS ID OROER # LOG TYPE CLASS MOD NO, CO~E (OCTAl) ~EPT FT O0 000 O0 0 0 4 I 6~ 00000000000000 ~'~"~N R,F~ 8 98 6:{6 2i 0' I 4 I 6$ 10000000'00.00'00 i:~'~ "FT 'PSIg 98 814 O0 0 1 4 PSIG 988i 4 'RES RFT 00 0 1 4 i'PRE RFT PSIG 98 814 O0 0 I 4 ~O{O RFT 9~ 8~4 O0 0 1 4 ~D2,0 RFT 98 814 O0 0 1 4 ~'OME RFT 98 81.4 O0 0 1 4 ~?,EN RFT 98 814 O0 0 i 4 ~?'HO R~T 98 814 00 0 1 4 i 68'10000000000000 I 68 10000000000000 00 00000 ,. 68 I010000~00000 1 68 0000 I 68 10000000000000 1 68 100'0'0000000000 1 6~ 10000000000000 1 68 10 0 1 68 1020000000 ooo ooooooooooo ,o oooooooo oo DATA ** )EPT 7347,5000 ETI~q 1,3070 6483,0000 PRES ,,533a2,0aO00 RPRE o,.o o ~HO 6,0000 .~R 103,9375 t?'?s. OOoo Poi0 4,0000 VP OlO,H02 VERIFICATION LISTING PAGE 4 322,49!9 T~N$ -6120.0000 RPRE 6.0000 PTEN 59.0625 3290.0000 MSPE -6120.0000 PDIO 3.0000 PHUN 1g,1562 0.067g 0.0000 'ILE NAME IRFT O1 Ii~RVICE NAM~ tbO~0 !ER$~ON # I 24.2 ~ATE 183t10t15 fAXXMUM LENGTH 11024 '~bE TYPE EOF ~ERSZON # t 24, )ATF $83/10/t5 ~ILE TYPE { 'R£V~OU8 F~bE ~ ~*,'DATA FORMAT RECORD. BLOCKS TYPE SIZE R~PR' i~OE ENTRY I I 66 0 5 1 66 ,~:1 4 ! 6 9 4 . i I:UCH 11 I' 66 18 ~6 ~ 6'6 0 66 )ATUM SPECZF{CATION BLOcKs ,D ORO.R .' ,.,OG. TYPE Ct,.SS .OD Ni'. i ! :C~,Ose (OCTAL,, ,EP? FT oo ooo oo o .. o00ooooooo0oo :TI~ AFT $ g8 6' 6 2'1 0 68 t0000000000000 ,sp~ ~r~ .~s ~, 1 o 4 se o,ooooooooooo, o s,cp .r? ps~c ~. et4 oo o , 4 .o~o, oooooooooo ~.~s .rT ps~c v. 8i~ oo o 2 ~ l' ,, looooooooooooo ~PRE AFT PSIG 98 814 O0 0 2 4 1 68 10000000000000 ~u,~o.r? 9, .~4 oo o ~' 4 ~ 6~ looooooooooooo VP 010,H02 VERIFICATION LIS?ING PAGE 5 D~O AFT 98 8i4 O0 0 2 4 0#~ er? 9p 814 O0 0 { 4 ?~N RrT 98 814 O0 0 4 'gUN ArT 98 6i4 O0 0 2 4 :R er? GAPI 98 ]tO O0 02 4 i 68 lO000000000000 i 69 0000000000 ! 68 l~]~O000000000 , 68 10200000000000 i 68 I0200000000000 , ,8 lO0'O0000000000 :e DR?~ ~ORMAT R£CORD :N?RY BbOCKS I 166 0 2 i 66 0 3 2 79 56 4 I 66 ~' 1 6 4 73 191 4 65 INCH 9 4 65 INCH i 6G 18 0 8PgCIFICATION BLOCKS SERVICE SERVICE UNIT RPI APl AP1 API' rlbE SIZE SPb REPR 0001 O00 0 4. ! e, OOOOOOO0OO0OOOoo ~ o , ~ ,o oooooooooo , ,,. ,ooooooooooooo ~o o, o ~ , ~ 0~ ~ooooooooooooo 814O0 0 2 ,4'i 68 ~01000'00000000 o,ooo,,o o,o,o,ooo ~tooo .~~ ~ ~ooooo'oooo ~t4ooo ~ ~ ~ ,~ ~ooooo oooo ~ ooo ~ ~ t ~. ~o,ooooooooooo ,~4ooo ~ 4 ~ ~, ~o2ooooooooooo .~.4 ooo ~ ~ t .~ ~o=ooooooooooo .~ ooo ~ 4 ~ ~, ~o2ooooooooooo ~o ooo = ~ ~ ~. ~ooooooooooooo 7 ~0,0000 ETI. M '6 3,0000 PRES 0,0630 PONE $',O000 GR 6986,~000 ETI~ 000 5205, PRES ~:o~o ~o~ 0000OR -6608. 000 PDIO 0.0679 800000 PHU~ i'O000 ':33'60 0000 "SPE 36 "' ' g,O000 PDlO 0 1,'0000 PHUN 2 VP 010,H02 VERIFICATION L~STING PAG£ 6 'I,bE NAME IRFT 02 ,ERVlCE NAME 150~0 ER'SION # I 24°2 i~X~NU~ ~ENGTH ~1024 *~L,E TYPE ~PR . 893/10/15 }AX2MUM ~ENGTH {10~4 TYPE ~NT~Y BLOCKS TYPE $~Z~ REPR CODE ENTRY 1 ! 66 0 4. I 66 '255 8 4 7~ 6 9 4 65 I'~CH )A?UM SP~czFIC.ATION BL, OCK$ ..... ~N:ER SERVIC~ SERVICE U{',,TI'T APl AP~~ ~.APX AP,~ FI,bE SIZE SPh REP'R PROCES'6 ,~e, ~, O0 000 O0 0 0 4 1 68 00000000000000 ~T,. RFT $ 99 636 21 O. ~ 4 I 68 04000000000000 =,o.~ ~ .. o~oooooooooooo. r~.~ ,. ~,.~ ~;o o o I ~ I,~ o.oooooooooooo ~," ~ ooo ~ ~ ~6. o,oo.oooooooooo !PRE RFT PSIG 98 DiO RF? 98 ~14' O0 0 m'D20 ~FT 98 81 4 O0 0 ~ONE RFT 90 814 00 0 PTE~ RFT 98 814 O0 0 ~UM ~FT 98 814 O0 0 ~T~O ~F? '98 814 O0 0 4 4 4 4 ~ i~ o,ooooo~ggoooo' 0400000 0000 I 68 04000'000'000000 I ~. o,~oooooo ~, o.~oooooog°°°° 0000 1. 6~ 0420'0000000000 i 68 042000,00000000 VP 010,H02 VERIFICATION LISTING PAGE ? CAPI 98 3t0 O0 0 3 4 ! 68 04000000000000 DATA FORHAT RECORD NTRY i 1 66 0 2 ! 66 0 3 2 79 56 4 i 66 255 ~ ! 66 0 6 .'4 73 Ill 8 4 73 6 ii 1 66 18 16 i 66 0 0 66 lid ORDER # LOG TYPE CLASS MOD NO, CODE (OCTAL} FT O0 000 O0 0 0 4 1. 68 00000000000000 8 90 ~3 21 0 3 4 ~n 98 ~ 9~! 21 0 3 4 PS 98 Ol 0 3 4 PSIG 98 814 O0 0 3 4 4 PS! 9884 O0 0 PSI~ 98 814 O0 0 4 988i 4 O0 0 3 4 ,,, ,,, 98 814 O0 03 4 GAP! 96 310 O0 0 3~ 4 ! 68 04000000000000 1 68 04000000000000 1 68 04000~.~000000 ! 6, 04100 000000 6~ 04000 00000000 I 68 04000000000000 ! 68 04000000000000 I 68 04000000000000 i! 04.200000000000 ~ 04200000000000 0,20000,0'00-0000 16804200000000000 1 68 04000000000000 ,lois {~'P O, 0640 PONE 0000 G~ 94,'~375 270.8069 0000 PT~ 0000 PDIO 0.0000 PHU~ ~094,.0000 ffSP£ s :oooo . to 000.0 PHUN g:oooo 0,4053 0,0669' 3.0000 FILE TRA:ILER ** iLE NAME IRFT: 003 VP 010,H02 VERIFICATION LISTIN~ PAG£ B 'ATE :P3/I0/15 AXI~U~ LENGTH :1024 'ILE TYPE 'EXT F~LE NAME 'REV~OUS FZLE DATA FORMAT RECORD ** :N?RY ~LOCK$ TYPE 8IZK RKPR CODE ENTRY i 66 0 66 0 I ! 66 255 5 ! 66 0 6 4 93 31! ? 4 65 INCH g 4 73 6 '9 4 6S ~CH 0 0 66 >AT,UM SPECIFICATIO~ ~50CK$ ~D ORDER # LOG TYPE CbA$$ MOD NO, CODE COCTAL) )~p? F? oo ooo oo o o 4 6~ oooooooooooooo EE'N$~'T'M RFTRFT $~ 98 9863636 ~!21 0 ,4 4 i 04000000000000 , o oooo oooooo ~.s ~?~ ~ o 4 4 ~o o~ooooo oooooo qSPE RFT qB P$~G 98 ~I4 O0 0 4 4 PSZG 98 gl4 O0 0 4 4 P$~G 98 814 O0 0 4 4 98 8! 4 O0 0 4 4 9~ 814 O0 0 4 4 98 8.14 O0 0 4 4 98 8i4 O0 0 :.4 4 98 814 O0 0 ' 4 4 98 81,4 O0 0 4 4 G.APX 98 3~0 O0 0 4 4 1 ~8 04'1000,00000000 8 04000000000000 ~ 68 04000000000000 68 0400000000 680400000000~g0000 o, oooooooooo o,, oooooooooo o ooooooooooo o ooooooooooo ** DATA FORMAT RECORD ENTRY BLOCKS VP 010,H02 VERIFICATION I, ISTING PAGE 9 TYPE SIZE R£PR cODE ENTRY ! i 66 0 6.6 0 4 I 66 255 5 ! 66 0 6 4 73 7 4 65 9 4 65 X~CH 11 I 66 18 16 1 66 1 0 0 66 INEM SERVICE SERVI:E UNIT PT APX API~o APl AP1 rlbB. SIZE 8Pb R~PR PROCES& (OCTAL) oo o oooooooooooooo 4 1 6~ 04'00,0,000000000 4 i 68 0400000000,0000 4 ! 6'8 040'00000000000 ,e,pT :TI~ RFT RFT i~P RFT ~'RES RFT iPRE RFT '010 RFT *020 RFT ~ONE RFT t'HU, N ~FT *THO RFT ;R RFT O0 S 98 6 bB 98 6 ,$ ReS ga 9'PO PSXG 98 8 4 P$IG 98 8 4 PSIG 98 8 4 98 8 4 99 8 ,4 ClPI qO 310 21 0 21 0 01 0 4 O0 0 4 4 1 '68 04100000,000000 O0 0 4 4 ! 6804000000000000 ~.~ 0 4 4 1 18 04000000000000 0 4 4 1 8 04000000000000 O0 0 4 4 168 04000000000000 O0 0 4 4 168 68 04'04~0000000000.000000000 O0 0 4 4 I i~0420~000000000 0000 O0 44 44 ,1 04200000000000 O0 0 4 4' ! 68 04000000000000 ,0000 PRES 3352,'0000 RPRE 3352,00 t0 ,0630 PONE' 1.0000 PTEN 5.0000 PHUN 3.0000 '":' ,,0000 GR 2,8418 0'0 PRES 3 0 RPRE 3336:0000 PDIO O, :, i., 0'630 PONE 0000 PTEN 3,0000 ,PHU~ 3,,0000 ~'THO 3,0000 GR 2'5313 ~, FILE TRAILER ** r~bE NA~,~ :,Rr'T 004 NAMZ :Lo f'gR'SION # )ATE 183/10~I , ~ILE TYPE VP 010.H02 V£~IFICATION LISTING PAG~ 10 ,ERV'ICE NAME! 'ATE IS)/! ' !AX]MUM LENGTH i~024 'REVYOU$ FILE DATA FORMAT RECORD ** ~NTRY ~LOCKS TYPE SIZE REPR CODE ENTRY 1 1 66 0 2 I 66 0 3 2 79 56 4 1 66 255 5 1 66 0 6 4 73 311 4 65 INCH ~ 4 73 11 ], 66 18 i6 ! 66 0 0 66 )A?UM SPECYFYCAT!ON BLOCKS {NEM SERV'ICg SERVICE UNIT I'D ORDER # !'l~NS RFT RFT PSI~ tPRE RET P~! *'DlO *HUN RFT ,R RFT oo ooo oo o o i 68 00000000000000 I ss o4.oe,eeo,ooo,o,,oeo 5 4 1 ea o4oooooooooooo 98 6 ~ ~1 0 9~ 98 98 9:~ 14 98 98 81~ 98 GAPI 98 t'10 O1 0 5 4 O0 0 5 4 O0 0 5 4 O0 5 4 O0 5 4 0 ,0 5 ..4 ~0 O' 5 4 O0 0 5. 4 O0 0 5, 4 O0 0 5 4 O0 0 $ 4 04000000000000 04,00000000'000 040000,00000000 040000000o00oo 04000000000000 6.'o oooooooooo,oo 0,200000000000 o, ooooooooooo o, ooooooo g oo o,oooooooo DATA FORMAT RECORD ** CNTRY BLOCKS TYPE 1 3 4 SIZf REPR 'I:06DE, ENTRYo ! 66 0 2 79 56 1 66 255 VP 010,H02 VERIFICATION LISTING PAGE 11 · 3 )ii ? 4 65 INCH 8 4 73 9 4 65 ii i 66 16 ! 66 0 0 66 lA?UN SP£CTFICATION BLOCKS 'NEM $~RVICE SERVICE UNIT ID ORDER # :'T~M RFT 'EMS RFT ~RE$ RFT 'PRE RFT P$IG 'D" ' 0 RFT 98 814 *D20 RFT 98 ~ 4 '"'ONE RPT 9, 4 ,TEN RFT *,NUN RFT 988! 4 APl APl ~Pl FILE SIZE LOG TYPE Ct, ASS NOD NO. 00 000 00 0 I 98 8t4 0 '5 4 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 5 O0 0 '5 O0 0 .'5 SPL ! ! ! ! 1 i 341 0630 PONE 3,0000 ,:, .oooo ,i 34 .:,0000 PRES .°°°° o.oooo RPRE PTE~ T~N$ RPRE 97o,ooo0 ~42{.0000 ,0000 Ig70,O000 42~,0000 ,0000 MAM~ {LO~ l, g3tiO/IS LENGTH 11024 . REPR~ PROCESS ~O'DE ¢OCTAL~ 0000000000000 04000000000000 04000000000000 68 04000000000000 68 04i00000000000 68 0400 i 680400~ ~000000000000 68 04000 00000000 68 04000 00000000 68 04200000000000 ~ 042000000000.00 04200000000000 6'80420000000000'0' 68 04000000000000 ]qSPE 0,.':67,04 PD10 O, 0679 P:HUN 4,0000 PH' ' 4'0000 VP 010,H02 VERIFICATION LISTING PAGE IERVICE NAME ERSYON ~ ~4, 'AXIMIIM bENG?H =I024 '15~ ?YPg 'REVIOUS FIbE DATA FORMAT RECORD :NTRY BbOCKS TYPE SIZE REP. COD~ ~NTRY ! { 66 0 2 ! 66 0 3 2 7g 56 4 ! 66 255 5 ! 66 0 6 4 73 ? 4 65 INCH B 4 73 6 9 4 65 INCH 0 0 66 i'A'~UM SPECIFICATION BSOCK8 INEM SERVICEID SERVICE ORDER # UNIT APG I APl bO~ AP APl Flb~ SIZE SPb REPR PROCESS CODE , , ,, o~ooooooo .ooo, oo S RFT RFT RFT R'~T RFT RFT R,FT R. FT S 9N 9~ 9~ 9B GAP],' 9B 3 0 6 4 !, 68,0,4000000000000 01 0 $ 4 ! 68 0,40000'00000000 O0 0 4 ,~ O,,O00'O0000000 i ~00 6 4 I 68 0400000'0000000 ~ o ~ ' ' Il otooooo~o,ooooo '4 O0 '0 6 4 042000000,0'0000 4 oo o ~ 4 ,o 04200000oo0000 ODo o ~ , ~ o~2ooooooooo'oo o ooo 6 ~ , 6~ o~ooooooo:ooooo ~*:DATA FORMAT RECORD ** TYPE SIZE ~E'PR CODE ENTRY I t 66 0 56 4 t 66 255 5 1 66 ,0 9 4 65 INCH .VP 010.H02 VERIFICATION L~STING PAGE 16 1 66 1 0 0 66 ,k?UM SPECIFICATION BLOCKS INEM S~RVICE SERVICE UNIT APl AP1 AP1 AP1, FILE SIZE SPL REPR PROCESS oooooooooooooo o~oooooooooooo o,oooooooooooo oGoooooooooooo o~ooooooooooo oaoooooooooooo o~oooooooooooo oaoooooooooooo o oooooooooooo 04~00000000000 ooooooo, oooo ooooooooooo o, ooooooooooo o,ooooooo, ooooo DATA '~.P 340 PR£S ID20 O' 630 )THO 3,0000 )~PT 65634,5918 ~TYM {GP 3388,0000 PRES m.~20 O. 0630 16,3410 TEH8 2990,0000 MSPE -0,1406 414,0000 RPR~ 3414,0000 PDt0 0,0679 ,_.~:00004653 PT£N ~,0000 P'HU, 4,0000 36S,2767 T~'~S ~9~0,0000 ~SPE -O,09~S 340.0,0000 RPRE. 3400,0000 PDlO 0.0679 ,0000 PT~ 9,0000 PHUN 3,0000 {{RSION # : 24, t83/10/~5 , ~tXIMUM L~GTH 11024 TYPE 'I'PR VP 010,H02 VERIFICATION LISTING PAG£ 14 REVIOU$ gibe DATA FORHAT RECORD 'NTRY BLOCKS 1 1 66 0 2 1 66 0 3 2 79 56 4 ! 66 255 '5 ! 66 0 6 4 73 7 4 65 INCH 8 4 73 6 9 4 65 INCH 11 I 66 18 16 I 66 1 0 0 66 SPECIFICATION BbOCKS SERVICE SERVICE UNIT API APl APl APl FIbE SIZE, SPb REPR iD ORDER M LOG TYP,E C~ASS MOD NO, O0 000 O0 0 9g 6)6 2 1 0 6'5~ 2 0 ~ m 0 O1 0 98 8i4 O0 ' 0 ,EPT FT 0 ?~'RS RFT LB RFT PSlG 7 RFT PSIG 98 8i4 00 0 ~Dt0 RFT '98 814 00 0 :D~ RFT g8 . 41 O0 0 "lq{)N RRT 9,'8 O0 O' ~#:UN RFT 98 8~4 O0 0 ,THO eFT gS 31 O0 7 4 4 4 4 4 4 4 4 4 4 4 4 4 4 :NT~Y BLOCKS TYPE $ 1! 0 sIZ~ 66 255' !i ° I~CH 66 1~ 66 1 66 )ATUM 8PE¢IrlCITION BLOCKS ~N£~ SERVICE 8ERVIC~ UNIT APl AP1 AP1 APl rILE SIZE SPL REPR ,oC ss CODE (O~oo~~ 68 000000000 68 040000000000~ 68 040000000000 68 04000000000000 68 04100000000O0O ,68 0400000000000.0 68 04000000000000 '68 0400000000000,0 04000000":000.000 i~ 0420000'000'0000 6B 0,4'{00'000'00,0'000 68 042000000'00000 68 042000000,00000 6g 04000000000000 PROCESS VP OlO,H02 VERIFICATION LI$?ING PAGE ~O ,EPT '~NS RFT PSP~ RFT ~'P,RE RFT 0 AFT "ONE RFT '?'~N RFT ':HUN RFT '?HO AFT ORDER # LOG TYPE CLASS MOD NO. FT O0 000 O0 0 0 S 98 636 21 LB 96 635 21 RPS q6 9?0- O! PSZG 99 614 O0 PSIG 98 8~4 O0 PSTG 96 954 O0 96 814 O0 q8 814 O0 98 614 O0 96 814 O0 98 814 O0 98 814 O0 GAP! 98 310 00 4 0 ? 4 0 ? 4 0 7 4 0 ? 4 0 7 4 0 ? 4 0 ? 4 0 7 4 ' 0 ? 4 0 ? 4 0 ? 4 0 7 4 CODE 66 00000000000000 68 04000000000000 68 040,000000'00000 66 04000000000000 66 04100000000000 66 04000000000000 66 04000000000000 68 04000000000000 68 0400~000000000 68 0420 000000000 04200~00000000 68 04200 00000000 04200000000000 04000000000000 )EPT 65510.1016 ETIM t:'.GP 3406.0000 PRE8 ~:~'20 0.0630 PONE ~'?HO 3,0000 GR )~PT 65578.,2969 ETIH ,GP 340!i0000 PRES ,:D~'O 0630 ~'?~0 0000 GR -9.8170 TE~S 341i?0000 RPRE 0000 PTEN '1548 19~,4203 TFN8' 341 PRE ,0000 R i~,O'O00 PTEN " .9813 940,0000 MSPE ]4'!.6,0000 PDIO 1'0000 PHU~ 29434i~.,1:~000000000 PHU.PD'iO"SeE o.o'4 000 0, ;t, 2'4 ~ 0,0'679 4,0000 ~,FIt, E HEADER r'~LE ~A~E tRFT ,.008 {EaVIC'E NAM~ ~?'£ teSt'l'Oli6 P~LETYPE EV OUS rlL ~'NTRY ~L. OCK5 ,, ,VP OIO.H02 VERIFICATION LISTING PAGE 16 TYPE S)ZE REPR CODE BNTR¥ i ! 66 2 ! 66 4 J 66 255 5 ~ 66 $ 4 73 31! 8 4 73 9 4 65 INCH ti ! 66 i6 ! 66 0 0 66 )RTUN SPECIFICATION BLOCKS IN~M S~RVICE SERVICE UNIT API APE APl. APE FILE SIZE SPL REPR ID ORDER # LOG TYPE CLASS MOD NO. )~PT ~'P ArT ~,'E,S RFT tR'£ RFT HUN RFT ;:IHO RFTRFT FT O0 000 0'0 0 0 4 S 98 636 21 0 8 4 I,B 9, 635 21 0 8 4 RPS 98 9TO O! 0 9 4 PSIO 98 814 O0 0 9 4 PSIG 98 814 O0 0 8 4 PS~O 98 8t4 O0 0 8 4 98 814 O0 0 8 4 98 814 O0 0 8 4 98 814 O0 0 8 4 98 8,14 O0 0 8 4 8 4 8 8 98 81~ O0 0 oo,' o oo o PROCESS CODE (OCTAL) 68 00000000000000 68 040000000000 0 68 040000000000~0 68 04000000000000 68 04100000000.000 68 04000000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04200000000000 68 04200000'000000 68 04200000000000 68 04200000000000 '68 04000000000000 ID ORDE~ # LOG TYPE CE, ASS MOD, NO, DEFT ' ' FT O0 000 O0 0 0 4 1 68 0000000,0000000 ETIM RFT ,$ 98 6]6 2~ 0 8 4 1 68 04000000000000 TENS AFT LB 98 635 21 0 8 4 I 68 04000000000000 ~SPE PFT RP8 9~ 970 01 0 8 4 I 68 04000000000000 ~NTRY BROCKS TYPE' SIZE REpR CODE ENTRY ½ I o° 3 2 79 56 4 1 66 255 11 I 66 18 16 1 6'6 1, 0 0 66 VP OiO.H02 VERIFICATZON LISTZNG PAGE ,GP RF? PSXG 98 814 'RE8 WFT PSXG 98 814 'O20 RFT 98 8! 4 ~HUN RFT 9m 814 "T~O ~FT 98 ~R ~FT GAP! 98 350 O0 0 8 4 O0 0 8 4 O0 0 8 4 O0 0 8 4 O0 0 8 4 O0 0 8 4 O0 0 8 4 O0 0 8 4 O0 0 8 4 O0 0 8 4 41 ' ,og°°°°°°°°°° oooooo, oooo ! i 68 04000000000000 ! 6~ 040000000'00000 1 68 04000000000000 1 68 04200000000000 ! 68 042000 0000000 ! 68 042000~0000000 i 68 04200000000000 5 68 04000000000000 DATA 16 ETIM ,EPT 65510'~0 3403, 0 O&30 PON£ . :oooo ~:P? 65628,5938 , ,0630 PONE ~?HO 3.0000 11 3380 TEN8 3- 0' 0000 PTEN ,i030 359,6741 TENS 3404,0000 RPRE 2,0000 PT~N 8,8828 ~ION # 'l 24. 183/{0/I5 ,,Xl~U~ .b~OT, ,.t024 {~RV~CE 1'83./{0/15 m'RX~MUN .bENGTH ?{'L£_TYP£ m,R}VIOUS FII, E ~NT~Y BhOCRB TYP~ 4 { ½ RE'PR' CODE 66 66 79 66 ~414 000 PDIO I .0000 PHUN 3010,0000 MSPE 3404,~0000 POlO 0, O0 PHiJM ENTRY 0 0 56 255" 0.,:0308 0'.06?9 4,0000 2."{211 0,.06?9 4.0000 ,VP 010,~02 VERIFIC~TIO~ LISTIN6 P~GE ~8 6 4 7 4 9 4 16 0 0 "73 65 73 66 66 0 3tl I~CH 6 INCH 18 ! IA?UN SPECTFZCATION BLOCKS INEM SERVI~.~ SERVICE UNIT APl AP1 APl APl FILE SIZE SPL REPR )EPT ~T'Z~ RFT I'SPE ,, RFT P.ROCES8 ooo ~ 6 , , ~ oioooooooooooo S 98 6353 2 0 9 4 98 21 0 9 4 ! 6804000000000000 ,~oo, o , ~ , ~ o,ooooooooooo~ 98 814 O0 0 9 4 ! 6$ 04100000000000 PSIG 98 8i4 O0 0 , 4 I 6, 04000000000000 PSIG 98 ,i4 O0 0 9 4 I 6, 04000000000000 9, 814 O0 0 9 4 I 6804000000000000 98 8i4 O0 0 9 4 ! 6804000000000000 98 914 ,00 0 9 '4 I 6804200000000000 98 814 O0 0 9' 4 1 6, 04200000000000 IIo ooooo ½ t ss o 1 66 0 t 2 79 ,56 4 I 66 25'5 ~ 4 I~CH 8 4 ?3 6 v 4 ss ~NC~ 66 _i 66 1 0 ID¸ c~,,i:P T TENS RFT ORDER # FT LOG TYPE CL~8 MOD ,N~, O0 0'00 0 98 814 O0 0 9 4 99 ~14 O0 0 9 4 :C,OD~ , ( 68 00000~00 O0' I' 6~ ,040000,00'000000 } '68 0400000,0000000 69 04000000000000 68 041000'000000'00 68 04000'000'0'00000 68 '0400'0'000000000 PR~8 RFT RPR~ RFT 8 9'8 1 S8 040§O0000gO000 .'t 6a 040 00000 0000 IP OlO.N02 V~RIFICATION I.,,~ISTI'NG PAgE 19 FEN ~FT 98 8i 4 i.{UN RFT 9~ 814 ~HO ~FT 98 81.4 ~ ~FT GAPI 98 310 O0 0 g ,4 O0 0 9 4 O0 0 9 4 O0 0 9 4 O0 0 9 4 ~p 65510,1016 ETIM {405,0000 PRES , 0640 PON~ ,0000 ~R EPT 65627,0938 ETIM 3P 3396,0000 PRES 320 0,0640 PONE r~10 3,0000 G~ 34~8,6820 TENS' 6,0000 RPR£ 5.0000 PTEN 6,9766 76 1183 TENS 3406,0000 RPRE 6,0000 PT~ 7,,5939 ~SlON # : 24,2 ~83/~o/15 mXIMU~ LENGTH :1024 TYPE {PR ~ F~L~ H~ADZR [L~ N~E :RFT ,010 E~VICE NAME ~XIHiIM LENGTH :1024 ILE TYPE ~VIOUS FIL~ t 68 04200000000000 1 68 04200000'000000 I 68 04 00000000000 1 68 04 00000000000 1 6~ 04000000000000 · 2904,0000 HSP~ 1. PHUN 900,0000 MSPE .0000 Pt)lO 40~,0000 P'HIIN 4,0679 ,0000 ,06~ 4,0000 ~ OAT~ FORMAT RECOPD ** STaY BLOCKS ~YPE 1 4 5 6 7 SIZE 1 2 1 1 4 REPR CODE 66 66 79 66 66 73 65 73 65 ENTRY 0 0 56 255 0 31.1 INCH 6 INCH IP 010,~0~ VEPliFtCATT.O?~ I.,!,STING PAGE'. 2(! 0 o 66 SERVICE U~'IT APl.. !Pi APl AP1 VILF, SIZE SPL REPR P,T.~ RFT S Of~ 636 21 0 {~NS PFT LB 9~ 635 ~1 0 ;PE ~PT RPS q~ 970 01 0 ;P ~FT ~SI(;; 9a ~14 O0 0 ~F ~FT ~SIa 9~ g!4 00 0 ~lO ~FT 9a ~1,~ O0 0 )~0 ~FT 9~ ~1.~ O0 n 3N~ ~FT O~ ~1.4 O0 0 ~EN ~FT 99 81,~ 00 0 '~.l [~ ~FT 98 ~!4 O0 0 ~ ~ F T G A, P I 9 Ii 310 00 0 p~,Oc~:ss Lt.,,(, TYPE ¢I,~SS ~,tOD {',JO, O0 000 O0 0 0 4 10 t 0 4 lo 4 ~0 4 10 4. ~.0 4 ~ 0 4 10 4 10 4 1.0 4 10 10 4 1.0 I 6~ 0000000000000~ ,! 6~ 0400000000000 1 6~ 04000000000000 t. 6~ 04000000000000 1 68 04100000000000 ! 6~ 04000000000000 !. 68 04000000000000 1 68 04000000000000 1 68 04000000000000 1. 6~ 04200000000000 1 68 04200000000000 ! 6~ 04200000000000 1 6~ 04200000000000 1 68 04000000000000 ~ ~ATA FOR;~T REC()~D ** 1 1 66 0 2 I 66 0 3 2 79 56 4 1 66 255 5 1. 66 0 6 4 73 3!,1 7 4 65 INCH ~ 4 73 6 9 4 65 l~C~ ~6 1 66 0 O 66 ~TllU ,q.r,'EC!FICATTGN P!.OCKS TO ~RDE~ # r,O(; TYPF CLIS$ ?,p'~ w'r O0 nO0 O0 0 0 4 rI~ ~FT S o~ 636 ;,NS ~VT La ~ 635 ~1, 0 10 4 5PV PF'T PPg 9~ 970 O1 0 10 4 ;P ~FT PSIC 9~ 814 nO 0 10 4 ~ES pv, PSl'G O~ B14 OO O 10 4 ~10 ~Fm O~ 81a nO 0 10 ~20 ~ O~ 814 O0 0 !0 4 i)~T~ ~T O~ ~!,~ O0 n 10 4 tEN ~FT 9~ 8 i 4 on o 1, 0 ruo ~FT q~ ~,a O0 0 10 4 ~ ~T ~Pl 9a 310 Or, tl !O a PROCESS CODE (OCTAL) 6~ 0000000000000o 60 04000000000000 6~ 04000000000000 6~ 04000000000000 6~ 041~0000000000 6~ 040000o0000000 6~ 04000000000000 6~ 04000000000000 ~ O400O000000000 6~ 04200000000000 68 04200000000000 68 o4200000000000 69 04200000000000 6~ 04000000000000 tP 010..0~ V~RIFIC~,TIO~ I,,I$?ING PAOE DaTA ** gPT 65510,1016 ETI~ {P 3397,0000 PRES )~0 0,0630 PONE tHO 3,0000 GR ~PT 65631,$938 ETI~ ~P 3392,0000 PRES >20 0 06~0 PO~ ,0000 0000 ~,00007605 FILE TRAI~ER ** ILE NAM~ :AFT ~RVIC~ NA~ ~RSION # : 24,2 ~TE t83/10/t5 ibE TYP£ {PR ~XT FIL~ NAM~ ********** EOF 0,0000 PHUN o.oooo 4o :oooo 0000 PHU~ '2,2'713 0,06, ,9 4', 0'000 ~ FILE HEADER ** [LE NAM~ IRFT. 011 ~R$ION # I 24,2 RTE I83/10/15 RXIMUM LENGTH 11024 iL~ TYP~ I DATA FORMAT RECORD ** NTRY #LOCKS TYPE 1 2 3 SIZE ~EPR CODE ENTRY 1 66 0 1 66 0 2 79 56 5 1 66 0 6 4 73 311 ? 4 65 INCH 8 4 73 6 9 4 65 INCH 11 i 66 18 !6 I 66 1 0 0 66 iTUM SPECIFICATION BLOCKS NFW SMRVICF $KRVICE UNIT APl lPI iPI lPI FILM SIZE SPb REPR PROCESS )~ ORD~R # LOG ~PT FT O0 {ME RFT RPS 98 ;P RFT PSiG ~ES PFT PSIG )~0 RFT 98 ~FT 99 {UN RFT r~o ~F? ~ RFT ~AP! DATA FORMAT RECORD ** ~?RY BLOCK8 TYPE ! 3 6 7 ~6 0 SPECIFICATION BLOCKS ~.D ORDER # LOG ~PT FT O0 rI~ RFT $ 98 )PE RFT RPS 98 ~P RFT PSIG 9g ~ 0 ~0 ~FT g~ PFT 9g D~E ~FT 9g ~UN RFT 9~ ~HO ~FT g~ ~ RFT ~ADI 9R DATA TYPE CLASS MOD :NO 000 O00 0 6)6 8t4 O0 0 814 O0 0 ii 8,14 O0 0 11 814 O0 0 11 814 O0 0 11 814 O0 0 11, 814 O0 ~0 ii 814 O0 0 814 O0 0 ~10 O0 '0 11 E REPR CODE' 1 6 1 6'6 1 6'6 0 66 API API TYDr CI,ASS MOD NO. 000 O0 0 0 616 21 0 635 21 0 11 9?O 01 0 11 814 O0 0 11 8i4 O0 0 11 814 O0 0 11 814 O0 0 11 814 O0 0 11 Pi4 O0 0 11 814 O0 0 1 i 814 O0 0 11 8t4 O0 0 ]10 O0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 1 1, 1 1 11 1 1 1 1 1' I 1 ENTRY 0 0 56 299 0 311 .INCH 6 INCH 1 SIZE SPb REPR CODE 4 I 68 4 1 6~ 4 1 68 4 I 68 4 I 68 4 1 68 4 1 68 4 1 68 4 1 68 4 1 68 4 I 68 4 1 6~ 4 I 6~ 4 1 68 OOrO~O~O~ 'C°DE'"eS OO 68 048 000,000000o 68 04000000000000 68 040000'00000'000 68 04100000000000 · 68 040000,00000000 68 0400000'0000000 '68 04000,00000,0000 68 0400,000'0~00'0000 $8 0:420'0000000000 68 0.4200000000000 68 0'4200000000000, 68 04200'000000000 6g 04000000000000 PROCESS' 00000000000000 04000000000000 04000000000000 04000000000000 04100000000000 04000000000000 04000000000000 04000000000000 04000000000000 04200000'000000 04200000000000 04200000000000 04200000000000 04000000000000 ~PT 65510.1.016 ETIM 8,2230 TENS 3094.0000 MSPE 1,964~ VP O~0.MO~ VERIFTCATIO!~ LISTING PAGE 23 ~P 3503,0000 P~ES ~0 0,0640 PO~{E MPT 65570'5000 ETI~ ~JP 3499,0000 PRES ~0 0,.0630 PO 5; ~:HO 3,0000 G~ . 0000 6,5625 165 4594 TENS 35tO,.O000 9.0000 170,2500 FILE TRAILER ** ~RVICE ~A,~ :LOG ERSION # : 24,~ ~TM :83/10/!5 ~XI:'~l{~ LENCT~ :1.024 SXT FTI,,F NA~E : ********** EOF *******~** 3514.0000 PDIO 1.0000 PHU~ ~os4. oooo 3SLO,:OOOO pDlo O. ooo ,0679 5,.0000 * DATa FORMAT RECORD ** ~{TRY BLOCKS TYPE SIZE PEPR CODE ENTRY 1 1 66 0 2 1 66 0 3 2 ~9 56 4 1 66 5 ~ 66 0 6 4 73 7 4 65 INCH 8 4 7t 6 9 ~ 65 INCH 11 1 66 18 16 1 66 0 0 66 ATU~ SPECTFIC~TION BLOCKS NE~ SERVICE SERVlCM tI,NIT APl APl AP1 API FILE SIZE SPb REPR PROCR$$ ID n~PE~ # LOG TYPE CLASS MOD NO, CODE (OCTAL) EPT ' FT O0 nO0 O0 0 0 4 1 68 0000000000000 0 · T. RFT S 9~ 6]6 21 0 1~ 4 ~ 6~ 04000000000000 EN$ RF? LB 9~ 635 21 0 1.2 4 ! 6fl 04000000000000 SPF ~? ~PS 9~ 970 O1 0 !2 4 1 68 04000000000000 tP OlO,H02 VEPlFICRTION LISTING PA~GE 24 4 O0 0,~:}O0 0 4 O0 0 ,12 O0 0 12 4 O0 0 12 4 O0 0 12 4 0 4 0 0 i2 O0 0 4 O0 0 1:2 4 O0 0 12 4 oiloooooo,<oOoo 040'0000'00:(0000 '04.00000'00(0'00.0 040000,000,0000 040000000~00:00 °,200°0°0,0000 o, oooo, oo,oooo 042000000,'0000 o, oooooo oooo o,oooooooooooo ~TRY BLOCKS S z,r ! 4 '! ? 8 4 1! 16 ~TUM SPECIFICATION ~I,,OCKS SERVICE SERVICE UNIT IO ORDER # ~IM ~FT ~NS RFT {PE RFT RFT RFT ~20 RFT 3NE RFT ~EN WFT ~UN RFT tho PFT R ~FT ° 3ti INCH 65 INCH 66 18 66 I 66 FT $ LB RPS 98 970 PSIC 98 814 PSI~ 98 814 PSIC 98 8t4 98 814 08 8i4 q8 814 ~8 8'14 98 814 GAPI' g8 310 API APl lPI .APl FILE SIZE ,SPb REPR PROCESS LOG TYPE CLASS 1'4OO NO. :COOE' . (OCTAL) O0 000 O0 0 0 4 1 68 00000000000'000 9'8 6.36 21 0 1 2 4 1 68 04000000.000000 98 635 21 0 12 4 I 68 04000000000000 O1 0 12 4 O0 0 12 4 O0 0 12 4 O0 0 1.2 4 O0 0 12 4 O0 0 12 4 O0 0 12 4 O0 0 12 O0 0 12 4 O0 0 12 4 O0 0 12 4 1 68 04000000000000 1 68 04{00000000000 I 68 04000000000000 1 68 04000000000000 ! 6~ 04000000000000 1 68 040000000'0'0000 1 68 04200000000000 1 $~ 04200000000000 i 68 04~00000000000 1 68 04 00000000000 I 68 04000000000000 EPT ~P THO 65510 1016 gTIM 3495' ,0000 PRES 0,0640 PONE 3,0000 ~R ~PT 65579.0000 ETI. 0O00 P'r,.g.~ 6.304'7 212,333] TENS 3084,0000 MSPE 3506,0000 PDIO 0,0000 PHUN 3084.0000 MSPE 1.,'9023 0,,0679 5.0000 50.1562 ,HO 3,0000 N',AM~ =RF? 012 :RVZC~ NA~E :RSION # I 24,2 =83/10/15 kXIMUM LENGTH {1024 TYPE FILE NAWE .350~,0000 PDIO ,0000 PHUN p~C,,E 25 .,' O00'0 FILE HEADER CRSION # I 24.,.2 ~TE 183/10/15 ~XIMUM LENGTH :1024 [LE TYP~ t~VTOUS FILE DATA FORMAT RECORD ~TRY ~LOCKS TYPE SIZE R~PR CODE ENTRY 1 1 66 0 2 1 66 0 3 2 79 56 4 1 66 255 5 1 66 0 6 4 73 311 7 4 65 INCH 8 4 73 6 g 4 65 INCH 0 0 66 ITl. IN SPECIFICATION BLOCKS qFM SERVICE ~ERVICE UNIT AP1 AP1 API API FILE SIZE SPb REPR PROCESS ID ORDER # I, OG TYPE CLASS MOD NO, CODE (OCTAI,) gPT FT O0 000 O0 0 0 4 ! 68 00000000000000 TIM RFT £NS RFT SPE ~FT ~P RFT RES ~FT PRE R~T OlO ~FT D~O PFT S 98 636 21 0 13 4 T,,R 9R 635 21 0 13 4 RPS 9~ 970 01 0 13 4 PSIG 9~ 814 O0 0 13 4 P$lG 98 814 O0 0 13 4 PSlG g~ 814 O0 0 13 4 99 814 O0 0 13 4 98 ~14 O0 0 13 4 ! 68 04000000000000 1 68 04000000000000 1 6~ 04000000000000 1 6~ 04100000000000 1 6~ 04000000000000 1 6~ 04000000000000 1 68 04000000000000 1 68 04000000000000 ~'P 010,H02 VERI'FICA?'IO, L.TSTTNG PAGE 26 oo 0 814 O0 0 ! 3 4 814 O0 0 13 4 814 O0 0 13 4 3io O0 o o,2o. ooooOooooo o, oooo, ooooooo o,, ooooooooo, oo 0,20000000,0000 o oooooooooooo DATA FORMAT RECORD ** 1 2 3 4 6 11 0 1 I 2 1 ¢ 4 4 4 l l 0 REP,R ~DE ENTRY0 o 65 0 73 311 65 INCH 73 6 66 18 66 ~ 66 kTUM SPECIFICATZON BLOcKs 4EH SERVICE SERVICE UNIT AP! .APl ID ORDER # LOG TYPE CLASS MOD NO, ~PT FT O0 000 O0 0 0 ~' RFT $ 98636 21 0 13 CNS AFT 3 0 ;P ArT PSIS 98 814 O0 0 ~S RFT PSIS 98 8i4 O0 0 APl, AP! rZbg SiZE SPt, R'EPR PROCESS CODE (OCTAL) 4 ! 68 00000000000000 I 68 0400000000'0000 I ~ 04000000000000 04000,0000000.00 1 6~ 0410000000'0000 I 6~ 04000000000000 1 6, 04000000000000 i 68 04000000000000 1 68 04000000000000 1 68 04200000000000 I 68 04200000000000 I 68 04200000000000 i 68 04200000000000 t 68 04000000000000 DATA GP 3489.000' 0 PRE~ 3500,0000 RPRE O20 0 0640 PONE 9,0000 PTEN THO 3~0000 ~P 6,1992 EPT 65600.7969 ETI~ 298,$327 TENS GP 3477.0000 PRES 34qO.O000 RPRE 020 0.0640 PONE 7,0000 PTE~ THO 3,0000 GR 166,$000 3i30,0000 MSP£' 3500,0000 PDIO 9,0000 P.U~ 124,0000 MSPE ~490,0000 PDiO 8.0000 PHUN 1,8B55 0.0679 4,0000 70 12'~67_~ O, 4.0000 :RS~ON ~ : 24 2 ~TE :~]/10/15 ' ~X~MI]M LENGTH {1024 ~X'T FI[,~ ~AME ********** EOF ********** ~RSION # 01 XIMUH LENGTH :1024 DATA FORNaT RECORD ** ~,TRY BLOCKS TYPE SIZE REPR CODE ENTRY I 1 66 0 2 1 66 0 3 2 7'9 56 4 1 66 255 5 ! 66 0 6 4 73 311 7 4 65 INCH 8 4 7 ) 6 9 4 65 INCH 11, 1 66 16 1 66 1 0 0 66 ~TUN SPECIFICATION BLOCKS EPT EN$ RFT GP RFT PRE PFT DIO RFT D 0 FT O~E R RFT TEN ~FT HUN RFT THO mFT R RFT PROCESS O~OER ~ LOG TYPE CLASS MOD NO, CODE (OCTAL) FY O0 000 O0 0 0 4: I 68 00000000000000 S 98 636 21 0 14 4 I 68 04000000000000 LB 98 635 21 0 14 4 I 68 04000000000000 RPS 9~ 970 O1 0 14 4 I 68 04000000000000 PSIG 98 814 O0 0 14 4 i 68 04100000000000 P$IG 9~ 814 O0 0 14 4 I 68 04000000000000 PSI~ q8 814 O0 0 14 4 I 68 04000000000000 ~B 814 O0 0 14 4 I 68 04000000000000 98 814 O0 0 14 4 t 68 04000000000000 98 814 O0 0 14 4 I 68 04200000000000 98 814 O0 0 14 4 1 68 04200000000000 9~ 814 O0 0 14 4 1 6~ 04,200000000000 9R S14 O0 0 14 4 1 6~ 04200000000000 CAPi 98 310 O0 0 14 4 1 68 04000000000000 1 66 0 1 66 ~55 0 ! 667, ,4, 6 ~ ~ oo ooo ooo o , ~ ,~ oooooooooooooo ~..~, ~ ~ ~,6 ~,o ~, , ! ~ o,ooooooo,ooooo ,, ,~, ,,..~ 00 ,,, ooo ,, , ,, ~. o,,ooooooooooo ~ES "FT PSI'G g8 ''14 O00 14 4 1 6g 041'00:00O0 000000 tUN RFT 98 814 O0 0 14 4 1 68 04200000000000 tHO RFT q8 814 O0 0 14 4 1 68 04200000000000 ~ ~FT GAP! 98 310 O0 0 14 4 1 68 04000000000000 gPT 65555.0000 ETIM 150,8564 TENS 30t0,0000 MSPE 49,2187 ~P 3500.0000 PRES 3512,0000 RPRE 3512,0000 PD$O 0,0679 ~20 0 0640 PONE 0.0000 PTEN 1,OOOO PHU~ 5,0000 ~HO 3~0000 ~R 158.8750 :RFT Ol 4 24°2 :~3/10/15 ~P OI, O,HO~ VERIFICATION LISTING PAGE 29 IkxI{mVlUM LENGTH :10:24, TYPE ~RSION # 24,2 ~?~ [LE TYP~ )EVIOUS FILE DATA FORMAT RECORD ** ! 1. 66 0 2 ~ 66 0 3 ~ 79 56 4 ! 66 255 5 ! 66 0 6 4 73 311 7 4 65 INCH ~ 4 73 6 16 ! 66 1 ATUM SPEC{FICATION BLOCKS ~E~ SERVIC~ SERVICE UNIT AP! AMI AP1 API FiLE BIZ[ SPb REPR ID ORDER # LOG TYPE CLASS ~OD ~0. EPT FT O0 000 O0 0 0 4 ~IM PET $ qB 636 21 0 15 4 ~NS RET L~ 98 635 21, 0 15 4 SPE RFT RPS 98 970 01 0 15 4 GP RF? PSlG 98 814 O0 0 15 4 RES RET P$IG q~ 814 O0 0 15 4 PRE ~ET P$IC 98 8!4 O0 0 i5 4 ~I0 ~FT 98 814 O0 0 15 4 D20 RET 98 814 O0 0 15 4 ONE ~FT 98 814 O0 0 t5 4 TEN AFT 9~ 8i4 O0 0 15 4 HUN WET q8 814 O0 0 15 4 THO ~FT q8 814 O0 0 15 4 R ~FT GAP[ 9~ 310 O0 0 15 4 PROCESS CODE (OCTAL) 68 00000000000000 68 04000000000000 $~ 04000000000000 68 040gO000000000 68 04 0000000000 68 04~00000000000 68 04000000000000 68 04000000000000 6~ 04000000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04000000000000 * DATA FORMAT RECO~D ** NTaY P[,OCKS TYPE SIZE REPP CODE 2 4 1 5 1 6 4 ? 8 4 9 4 11 t6 1 0 0 66 6'6 66 66 65 6 0 0 255 0 31.1 I~CH 6 18. 1 ~PT FT O0 000 O0 0 0 4 ! 68 0.00100000000000 0 ~FT 98 814 O0 0 1:5 4 68 04000000000000 3NE RFT 98 814 O0 0 15: 4 68 04200000000000 C~N RFT 9~ 814 O0 0 15' 4 1 68 04200000000000 {UN ~FT 98 814 O0 0 15 4 I 68 04200000000000 FHO ~FT 9~ 814 O0 0 15' 4 1 68 042'00000000000 ~ ~FT ~lPI 08 ]10 O0 0 15 4 1 68 04000000000000 ~PT 65510.i016 ETIM 23,46~0 TENS 3074.0000 MSPE 2,0117 lP 3490.0000 PRES 3502.0000 ~PRE 3502,0000 PDIO 0,0684 )20 0,0640 PONE 9 0000 PTEN 0,0000 PHUN 5,0000 ~HO 3.0000 G~ 6:664t $PT 65635.2031 ZTI~ 380,7971 TENS 3070,0000 MSPE 2,2148 =P 3481.0000 PRES 3494 0000 {~PRE 3494,0000 ~DiO 0.0679 )20 0.0640 PONE 3~0000 PTEN 9.0000 PHU~~ 4,0000 THO 3.0000 ~ 7,1797 ~LE NAME {RFT ERSION # : 24,2 ~TE :B3/10/15 ~XI~U~ ~g~GT~ :1~24 II~E TYPE lP~ ~XT F~[,~ NAME : 015 ~ME ~FT gR'B, ION# 4 ~XIMUM LENGTh, ,1024 TYPE ~EVIOUS FI~ ~TRY BLOCKS TYPE SXZ~ REP'E C~D'E EN'TR~ 4 ! 6~ 255 5 ! 66 0 6 4 I~ ]ii 7 4 8 4 73 6 9 4 65 INCH 11 ! 66 0 0 66 ~TUM SPECIFICATION BLOCKS ~E~ SERVICE SERVICE UNIT APl AP1 APl APl ~FILE SIZE SPL REPR I0 ORDER # LOG TYPE CLASS MOD NO. CODE PROCESS (OCTAL) 0000000000 ZPT FT O0 000 TIM RFT S 98 636 ENS PFT LB qB 6)5 SPE RFT RPS 98 970 ~P RFT PLIG 98 814 RES RFT PSXG 98 81.4 PRE RFT P$I~ 98 814 BIO RFT 9~ O20 RFT 98 814 DNF RFT 98 814 ~KN RFT 9~ 814 HUN RFT 98 814 THO RFT 9~ 814 ~ RFT GAPI 98 O0 0 0 4 21 0 16' 4 21 0 16 4 O1 0 16 4 O0 0 i 6 4 O0 0 16 4 O0 0 16 4 O0 0 16 4 O0 0 16 4 O0 0 16 4 O0 0 16 4 O0 0 16 4 O0 0 16 4 O0 0 t6 4 68 0000 68 04000000000000 68 04000000000000 68,04000000000000 68 04100000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 04000000000000 68 0,4200000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04000000000000 * DATA FORMAT RECORD NTRY PLOCKS TYPE SIZE REPR CODE 66 66 79 66 66 ENTRy 0 0 56 255 0 tp OlO,H02 VERIFICATION b%STINg PAgE 11 1 66 18 16 1 66 0 0 66 ~.TUM SPMCIFICATIC)N ~LOCK$ ID ORDER # LOG TYPE CLASS MOD NO, CODE (OCTAL) .~PT FT O0 000 O0 0 0 4 1 68 00000000000000 21 0 t6 4 1 68 04000000000000 6¸6 ~IM RFT S ~ 6']5 ~NS RFT DB 0 16 4 )PE RFT RPS 98 9?0 O1 0 16 4 ;P ,r? PSIG 9, '14 O0 0 t6 4 ,ES AFT P$I~ 9" 814 O0 0 16 4 ,10 ,,? 9, 8,4 O0 0 16 4 )20 ,FT 9, 8,4 O0 0 16 4 ~NE RrT 98 814 O0 0 16 4 ~E~ ,FT 98 814 O0 0 16 4 ,UN ,FT 9~ 814 O0 0 16 4 ~HO R~T 98 814 O0 0 16 4 68 04000000000000 6804000000000000 68 0.4100000000000 68 04000000000000 68 040'00000000000 6~ 0400000000'0000 68 0400000'0000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04200000000000 68 04000000000000 ~DATA ** ~PT 65510,1016 ETX~ 17.6100 TENS ~04~,~000 ~SPE 2,0'430 ~P 3493 0000 PRES 3504,0000 RPRE ~.vSO 000 PDXO 0,0684 3~0 0:0640 PONF 3,0000 PTE~ 0,0000 PHUM 5.0000 tHO 3.0000 ~R 6,7695 ~PT 65717'59]8 ~TIM 620,9453 TENS 3050,0000 MSPE -0,0i56 ~P 3485,0000 PRES 3496.0000 RPRE 3496,0000 PDIO 0,0679 D20 0,0640 PONE 5,0000 PT~N 9,0000 PHUN 4,0000 tHO 3.0000 GR -0.3618 XLE Na~ :RFT ~RSION # I 24.2 ~.TE 1~3/10/15 AX~MJ,IM LENGTU 11024 ILE TYPE * FILE HEAD~P ** XLE NA~M =~rT 017 VERIFICATION LISTING PAGE DATA FORMAT RECORD 1 ! 66 2 1 66 4 l, 66 255 5 I 66 7 4 65 INCH 0 0 '66 {TU. 8PECiFICITION BLOCKS ID ORDER { LOG TYPE CLASS NOD NO, CODE' (OCTAL) ~T FT O0 000 O0 0 0 4 '} 68 O00'O000000000O r . .r? s 98 6~e ~l o l? 4 es 04000000000000 ~.s ~r? ~ ~ 63s 21 o t? 4 i es 0400000000000,0 iPE EFT RPS 98 9TO O! 0 1T 4 $$ 04000000000000 ,,P RFT PSIG 98 814 O0 0 i7 4 'l ,., .,, .,,= ,, , o ,, ,, o oooooooo,oooo ~lo ~r~ 98 si4 ooo 1T 4 1 es 04000000000000 v2o Rr? 9. 81~ ooo tT ~ t se 04000000000000 s ooo tT 4 1 ee 04.200000000000 3NF, EFT 98 ?FEN EFT 98 8t4 O0 0 17 4 ~IUN EFT 98 gl4 O0 0 17 4 ~ ~FT GAPI 98 310 O0 0 17 4 68 04200000000000 04200000000000 68 04200000000000 68 0400000'0000000 DATA FORMAT RECORD **~ NTRY BLOCKS TYPE SIZE REPR CODE ENTRY 1 ! 66 0 2 1 66 0 3 2 .79 56 4 1 66 255 5 ! 66 0 6 4 73 3ii 7 4 65 INCH 8 4 73 6 9 4 65 I~CH ll 1 66 18 ~P Ol.O.H02 VERIFICATION LISTING PAGE 34 1,6 0 0 66 SERVICE SERVICE UNIT API AP! API API'~FILE SIZE SPL REPR LOG TYPE C5A$S MOD. NO. EPT FT O0 000 O0 0 0 4 ~IM ~FT $ 98 636 21 0 1,7 4 ENS ~FT LB 98 635 ~1 0 17 4 ~P~ ~T ~PS O~ 970 O1 0 17 4 ~P ~:FT P$~ 98 ~14 O0 0 1,7 4 ~E$ ~FT PSIG 98 8~,4 O0 0 ),,7 4 PRE RFT PSIG qg 814 00 0 1,7 4 ~10 RFT 98 814 00 0 17 4 ~20 ~F'T 9~ ~1.4 O0 0 17 4 9ME ~FT 98 814 O0 0 17 4 ~EN ~FT 9~ 81~ O0 0 17 4 ~UN ~TT O~ ~4 O0 0 17 4 ~ ~FT GAPI 98 ]10 O0 0 17 4 P~OCESS CODE tOCTll,,) ! 60 00000000000000 1 68 04000000000000 1 68 0400000'0000000 1 6~ 04000000000000 I 68 04100000000000 I 6~ 04000000000000 1 6~ 04000000000000 I 68 04000000000000 1 6~ 04000000000000 I 68 04200000000000 I 68 04200000000000 1 68 042000000,00000 1 6~ 04~00000000000 I 6~ 04000000000000 DATA 65510 1016 ETI~ 0 2610' TENS 352~0000 P~ES t540;0000 ~P~E 0: 0640 uONE 8,0000 PTEN 3 0000 G~ O, 1548 3064,0000 3540,0000 PDIO 3,0000 0.0464 0.0679 5.0000 65616 3906 ETI~I 305.9969 TE~$ ]524:0000 P~ES )53a 0000 ~P~E 0.0640 PONE ~'0000 PTEN 3.0000 GR 165:8750 3064,0000 ~8PE 3534,0000 PDIO 3,0000 P~UN 1,5127 0,0679 5,0000 FILE TRAII, E~ ILE NA~E ~T ,0!7 ERVICE NA~E ~SIO~ ~ : 24.~ ~TE :~3/10/15 ~XI~U~ LENGTH :10~4 II.,E TYPE EXT FILE l~ [.,E N~E :RFT ,01@ ~T~ :83/10/15 ~XI~II~ I,,ENGmH :1024 TLE TYP~ IP 010,H02 9ERIFICA?ION LISTING PAGE 35 TYPE SIZE 4 ~ 7 4 ~ 4 9 4 0 0 REPE ~DE, ENTRY0 66 0 79 56 66 255 6,6 0 73 311 ~$ I~CH 66 66 iD ORDE. # bOG TYP. CLASS,MOD .0. CODE . ~PT FT O0 000 O0 0 0 4 ! 6,~ .0.000000,~~00 ~"M RFT $ 98 i;~ Ii 0 4 1 6~ 040000000~000 I 4 1 60 040000000 000 SPE RFT RP~ 99 970 ~ES ~FT PSIG 98 814 )RE RFT PSI~ 9~ 81,4 )t0 ~FT 99 ~14 )20 RFT 98 814 ]NE RFT 98 814 ~EN RFT 98 814 4UN ~FT 95 814 ~HO RFT 98 814 ~ RFT GAPI 98 310 O1 .0 ,18 4 O0 0 18 4 O0 0 18 4 O0 0 18 4 O0 0 18 4 O0 0 18 4 O0 0 18 4 O0 0 18 4 O0 0 18 4 O0 0 18 4 O0 0 I~ 4 1 68 04000000000000 1 68 0'4 00000000000 68 0~00000000000 I 68 0400000000'0000 1 6~ 04000000000000 t ~ 040000000'00000 I 04200000000000 1 68 04200000000000 1 68 0.4200000000000 1 68 04200000000000 I 6~ 04000000000000 DATA FORMAT RECORD ** ~TRY BLOCRS TYPE 2 4 5 6 7 9 11 16 0 SIZE REPR CODE ENTRY 1 66 0 66 0 79 56 ] 66 255 i 66 0 4 73 311 4 65 INCH 4 73 4 65 ! 66 18 1 66 0 66 SPECIFICATION BLOCKS ID O~DER ~ LOG TYPE CI.,ASS ~OD NO, CODE PROCESS (OCTAL,) ~P 010,~0~ VE~IFICATIO~ LISTI~ ~PT FT 00 000 ~P~ ~FT RPS 99 9?0 ~P ~FT P$IG 98 814 ~E$ ~T PSI~ 98 81~ ~R~ ~FT PS~G 98 814 )10 ~FT ,98 8~4 )20 ~FT' 98 814 ~EE ~FT 98 ~U~ ~FT 98 8! 4 ~HO ~FT 98 ~4 ~ RFT CAPI 98 310 00 21 01, 00 O0 00 00 00 00 00 00 00 00 ~PT 65510 ~0.i~ ~TiH 320 0,0640 PON~ tHO 3.0000 OR SPT 6'5688 3I ETIM ~P, 338 00 , 00 ~R 30.1280 T~N8 3404,0000 RPRF - 1035 545.2618 TENS ])94,0000 RPR~' 4,0000 PT~N -0.1035 ~ FILE TRAIL~R ** £LE NAME {RFT ~RV'ICF NAME ~[,0~ ~R$ION # i 24,2 ATE :83/10/15 AXIMUM LENGTH :1024 FILE MEADER ILE NAME :~FT 019 ERVICE NAME aT~ 183t10t15 IXIMUM LENGT, :1024 ILE TYPE REVIOUS FII, E 0 18 18 18 18 18 0 1,8 0 18 0 18 0 18 0 18 0 0 18 0 18 PAGE' 36 , 1 6~ 00000000000000 I ,68 0400000000000§ I 68 0400000000000 1 '68 ~000000000000 i 68 100000000000 1 ~8 04000000000000 ! 68 04000000000000 I 68 04000000000000 1 68 0400,0000000000 ! 68 04200000000000 68 04 0000000000 I 6, 04~0000000000 04~000000'00000 ~ 04 00000000000 2810.0000 MSPE 3404,0000 PO10 0,0000 PHUN 28~0,,0000 ~SP~ 33 ~.0000 POI0 .0000 PHUN 0,0679 4.0000 '9,~313 6.79 :oooo DATA FORMAT RECORD ** NTRY BLOCKS TYPE SiZE REPR CODE ENTRY VP 010.HO2 VERIFICATION' LIST]`NG PAG~ 37 1 ! 66 0 2 1 66 0 5 ~, 66 ,0' 6 4 ?] 3tl 9 4 65 ,,,1 2. 66 !,8 t6 ! 66 1 0 0 66 IITUM SPECIFICATION BLOcKs` '~ gEM SERVICE SERVICE UNIT APl AlP! AP! AP']' FIL. E SIZE SPb REPR ID ORDER # I, OG TYPE CLASS MOD: NO, ZPT FT O0 000 O0 0 0 4 ,1. R~T ~ 98 6,6 21 0 19 4 ~.'8 .FT b. 9. 63'5 21 0 19 4 'PE .PT RPS 95 970 O1 0 19 4 ~P "FT PSIG 98 814 O0 0 19 4 PROCESS ooooooooooo o,,oooooooooo, oo o oooooooooooo o ,oooooooo,ooo o,oooooooooooo o,oooooooooooo o,oooooooooooo o,oooooooooooo o ogooooooooo ooooooooo o. ooooooooooo o. ooooooooooo o.ooooooo,ooooo DATA FORMAT RECORD ~TRY BLOCKS TYPE SIZE REPR CODE ENTRY 1 1 66 0 2 t 66 0 3 2 7g 56 4 1 66 255 5 1 66 0 6 4 71 7 4 65 INCH 8 4 73 6 9 4 65 INCH 11 1 66 18 16 I 66 1 0 0 66 tTUM SPECIFICATION BLOCKS N£M SERVICE SKRVICE UNIT APl AP1 AP1 AP1 FIL$ 5IZE SPh REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NO. CODE (OCTAL) ZPT FT O0 000 O0 0 0 4 1 68 00000000000000 ~IM RFT S 98 6]6 21 0 19 4 1 68 04000000000000 ~NS RFT LB 98 635 21 0 19 4 1 68 04000000000000 SP£ RFT RPS 9~ 970 O1 0 19 4 1 6~ 04000000000000 ~P RFT PSIG 9~ 814 O0 0 19 4 I 68 0410'0000000000 '02 RFT 9~ ~N~ RFT 98 'HO RFT 98 8X4 O0 0 O0 0 19 O0 0 19 O0 0 19 O0 O' O0 0 19 O0 0 19 O0 0 19 :PT 65510,i016 ETIM ;P 3384,0000 PRES )20 0,0640 PONE 'HO 3,0000 ~R 65622.0000 3380,0000 PRES 0,0640 PONE 3,0000 670 TENS 3396'0000 PTE~ 286 9718 TENS 3]92;0000 RPRE 0,0000 PTEN -'0,41 )6 FILE TRAIb£R ** :bE NA,~E :RFT :RVICE NAME :l.,,O~ :R$ION # I 24,2 ~TE {83/10/i5 ~XXMIJM LENGTH {1024 ~LE TYPE lPR :XT F~LE NA~E : EOF ********** ,4 ,4 4 4 4 4 4, 4' 4 04000000000000 040000000'00000 04000000000000 040000000000,00 ~4200000000000 4200000000000 0420000'0000000 04200000000000 04000000000000 2924,0000 MSPE 139~,0000 PDIO ,0000 PHUN -0,0469 0,0679 3,0000 9 .0000 PDIO ,0000 PHUN =0,1406 ~,0684 .0000 ~ FXbE HEADER ** ~RSION # ~ 24.2 kTE t83/~0/15 kXIMUM ~ENGTH ~1024 [b~ TYPE DATA FORMAT RECO~D ~TRY BLOCWS TYPE 1 2 3 4 5 SIZE 1 ! 1 1 REPR CODE 66 66 79 66 66 ENTRY 0 0 56 255 0 VP OiO,H02 VERIFICATION [r, iSTING PAGE 39 6 4 73 3'11 7 4 65 INCH 8 4 73 6 i6 1 66 0 0 66 ATI.) SPECIFICATION BL, OCK$ NEM SER%ICE SERVICE [INIT APl APl APl, :APl FILE SlZ$ SPb REPR ID ORDER t LOG TYPE CLASS MOD NO, O0 000 0 4 EPT PT O0 0 TIM RFT S 98 636 21 0 20 4 £NS RFT E,,B 98 615 21 0 20 4 GP RET PSlg 98 814 O0 0 20 4 RES ~FT PSI(; 98 814 O0 0 20 4 PRE RFT PSiG 9~ 814 O0 0 20 4 020 ~FT 9~ ~14 O0 0 ~0 4 ONE ~FT 98 814 O0 0 20 4 ~KN ~FT 98 814 O0 0 20 4 HUN RET 99 ~14 O0 0 20 4 YHO RFT 98 B14 O0 0 20 4 R RFT GAPI 98 ~0 O0 0 20 4 PROCESS CODE (OCT 68 00000000000~ 6~ 04000000000000 6~ 04000000000000 68 04000000000.000 6804100000000000 6g 04000000000000 68 04000000000000 6~ 040000000000'00 68 04000000000000 68 04200000000000 68 04200000000000 68 04200000000000 6~ 04200000000000 68 04000000000000 * DATA FORMAT RECORD ** NTRY BLOCKS TYPE SIZE REP~ CODE £NTRY 1 ! 66 0 2 I 66 0 3 2 79 56 4 1 66 255 5 1 66 0 6 4 73 311 7 4 65 INCH 8 4 73 6 9 4 65 INCH 11 ) 66 lB 16 1 66 i o 0 66 ITUM SPEClFYCITION BLOCKS NEM SERVICE SERVICE {.1NIT API AP1 AP1 APl FILE SIZE SPt, REPR ID ORDER # LOG TYPE CLASS MOD NO, EPT FT O0 000 O0 0 0 4 tim RFT S 98 636 21 0 20 4 EN$ RFT LB 9~ 635 21 0 20 4 ~PE ~T RPS 9~ 970 O1 0 20 4 ~P ~FT PSIG 9~ 814 O0 0 20 4 PR~ RFT PS~G 98 8!4 O0 0 20 4 OiO ~FT 98 81,4 O0 0 20 4 D20 ~FT 9~ 814 O0 0 20 4 ~NE ~FT 98 8la O0 O 20 4 PROCESS CODE (OCTAL) I 6~ 00000000000000 ! 68 04000000000000 I 6~ 04000000000000 i 68 04000000000000 1 68 0410008g000000 I 68 040000 000000 I 68 04000000000000 1 6~ 04000000000000 1 6~ 04000000000000 1 68 04200000000000 ]P 010,H02 VERIFICATION LISTING PAGE .40 rEN 'RFT g8 814 rHo RFT 98 814 RFT GAPI g~ 310 00 0 20 O0 0 2O O0 0 20 O0 0 2O I 68 04200000.000000 .1 68 04200000000000 t68 04200000000000 1 6, 04000000000000 DATA ..'.PT ;P )2O ~PT )20 tHO 65510,1016 E?I]M 3340.0000 PRES 0.0640 PONE 3,0000 ~ 65660,0000 ETI~ 3333,0000 PRES , 0640 PONE ,0000 GR 1,3640 TENS '22 ~000 RPR£ 800 0.'1 30 459.:0980 TENS 3341,0000 RPRF ,0000 PTEN 0,9814 FILE TRAILER ** ~bE NAME IRFT 20 ~RVICE NAmE :t,o~° ERSION # : 24,2 %TE 183./10/15 .XINU~ LENGT, ~1024 LE TYPE {PR EOF ********** 2840,0000 NISPE 3352,0000 Pi)tO 5,0'000 PHUN ~2590,0000 3344,:0000 PDiO 4,0000 PHUN 0308 3,0000 O,3Bg6 0,0694 3,0000 ~ FILE HEADER ** ZRVICE NAMB ER$ION # ~ 24,2 ~TE %XI~UP LENGTH ~1024 [LE TYP~ ~EV~OU$ FTL~ FIbF TRAILER ** NAME ~RFT , 021 ~$ION # : 24.2 ~8]/10/15 IXIMtlM LENGTH ~1024 TYPE F~T,E NA~E t EOF EOF ** REEl, HEADER SERVICE ~A~E :EDIT ORIG~N CONTINUATION ~ ~0~ CON~ENT'S {REE[~ CHM~ENT8 SERV'IC~. NAME ORIGINDATE !~)/,~!18 TA:PE NAME 8718 ONTINUATXON # 101 REVIOU8 TAPE COMMENT8 ITAP~ COMMENT8 ** FILE READER ** FI[,~ NAME :EDIT ,001 8~VIC~ NAMg : VERSION # l DATE : MAXIMUM LENGTH I 1024 FILE TYPE { PREVIOUS FlUE { ** INFORNTATION RECORDS {NEM CONTENTS CN ~ ARCU AbASKA INC WN I 1G-15 FN I KUPARUK SECTI 29 COUNI N, $I~OPE ST4Ti A£,~SKA CTRY! USA UNIT TYPE CATE SIZE CODE 000 000 0 O~ 000 000 { 065 065 000 000 0 065 000 000 004 065 000 000 004 065 000 000 002 065 000 000 008 065 000 000 006 065 000 000 004 065 [~VP 01,0,HO~ VERIFIC.~TION LISTING P~GE 2 *' $CHLU~BERGE~ *************************************************************************************** COMPANY =, ATSANTIC RICHFIELD COMPANY F'IE[,P =, PRUDHOE BAY COUNTY = NORTH SLOPE BOROUGH STATE RUN,#I. DATE LOGGEDg27-0CT-83 5DP'i R, SINES CAS]N'G _ m 10.75" ~ X' - ~]T SIZE = 8.5" TO 7533~ TYPE F~UIO = 'X-C POLYMER DENSITY m 9-8 LB/G R~ m 3,01 N 65 DF ~_ I, Oss = 5.$ C) RM ~,T BHT = .4i6 e i46 OF ~ATRiX SANDSTONE [~VP OlO,H02 VEF~IFIC,~TIO~ L~?~NG PAGE $CHbU~BERGER LOGS IN'CLUDED ~ZTH THIS ~AGNETIC TAPEr * DUA~ INDUCTIOH SPHERICAbbY FOCUSED bOG * FORMATION DENSITY COMPENSATED LOG (FDN) * * COMPENSATED ~EtITRON LOG (FDN) DATA 'FORMAT RECORD g~,~y~D BLOCKS TYPE SIZE ~EPR CODE 'ENTRY · 4 66 9 4 65 ,,'lin 0 t 66 0 DEPT FT 0 0 0 SF~L! OIL OHM~ T 0 0 ,LM DIL OH~. ? 0 0 ILD DIL OHM, 7 ,~ 4~ SP DIL .V ? 0 0 4 0 0 0 4 0 i 0 0 .4 0 0 00 0 ~ 0 t 0 4 0 0 0 4 0 ! 68 0 0 4 0 1 0 0 4 0 l' bVP OlO,H02 V~RIFICA?ION tISTING PAGE 4 NRA? FDN 44~ RNRA FDN ER FDN GADI 42 DATA DEPT' 756~,0000 RHOB '32~ 8"000844 NRAT 2"7598 NCNb RNRA NCNb 2264 RNRA SFLU 2 GE NCNb 2096 OEPT 7500 ~000 SP. ,,!9': 125 RHOB t,4346 NRAT , ! 445 OEP? 7401,i000 NR.., 3.3340 PT 7~00,0000 SFI,~U ., -28,5~56 GR RHOB 2,; 65 NCNb NRAT 3, 008 RNRA 1790 4 4 9! 2254 6 74 2690 44 50 2910 4 90 2508 2 2 1 5 1 DEPT 7100,0000 SrblJ 8P -35,7188 GR RHOB ~ 3945 NCNb NR~T :8555 RN~A DEPT 7000,0000 Srbl.! SP -73,5000 GR RHOB 2,2969 NCNb NRAT 2,9102 RNRA \ [, ~ 6900 0000 SFLU SP. -36:2500 GR RHOB 2,4570 NCNb NRA. T 2,6563 RNRA DEPT 6900,0000 SFt, U SP -41,7813 GR RHOB 2,4590 NCNb NRAT 3,2246 RNRA DEPT 6~00,0000 SFCIJ SP 31,5156 ~R 1 0 32 3672 ~0625 .5000 .0117 ,3555 ,i895 .0000 .4004 7285 7695 ,¸2 0 .0000 .5195 ,9:539 ,1250 ,0000 .8477 ,4297 ,5000 ,0000 ,1094 .0000 ,2578 .! 000 8O27 4375 0000 ,3535 .6807 ,0625 IbM NPH! FCN[, GR NPH! NPM! GR NPH! FCNL GR IbM NPHI rCNb GR NPH! FCNL GR NPHI FCNb GR NPHI FCNL IbM NPN! FCNL NPHI 30, -,~12, 25. 4395 2734 6250 0625 4~ 429 6991 665 5000 106 1875 .6465 98, 7773 3i. 25 4,,6523 29,5898 791.0000 g1,1250 6,6680 86 0000 75000 5938 3 6992 27 1973 878 0000 90 9375 2,8906 35,2051 61t,0000 11 ,4375 1,6143 49,1211 IbP. DRHD CALl II~D DRH'O bALI IL:D DRHO DRHO DRHO CALl ELD DRHO bALI DRHO ILD DRHO CALl IbD DRHO DRHO 1 68 1 68 1 68 .787i -3276 ,'0000 8,5000 ,4297 4'00!5 , .4570 4980 ,0 4 ! '42i9 i:, i 6,5847 0'~186 9, 62 3g,3750 -0,0063 8,5859 3,5605 0,0356 9,7500 2,6777 0,0620 10,8750 t,5586 0,0273 bVP 010,H02 VERIFICATION [~iS?XNG PAGI~ 5 D~.? 660~:000o SP ,3656] ,HOD NRAT ,320 6504 ~EPT 6500'0000 SP.- RHOB -99g,g5..O0 NRAT '999'25:00 O~P? 6~00,000:0 D'gPT {P OEPT RHOB NRA? SP RHOB NRAT DEPT DEPT ~HOB N~AT O~PT 8P RHOB NRAT D~PT 6200.0000 '3'6.5000 -999,2500 -999.2500 6100..0000 '38,0000 -'999.2500 '999,2500 6000.0000 -38,7500 -999,2500 -999,2500 00,0000 ~33,5000 999~2500 999~2500 5800.0000 -3~.8750 ~99 .2500 -999,2500 5~0.0000 2.5000 '999,2500 '999.2500 5600.0000 NCNI~ RNRA RNRA NCNb RNRA SrbU RNRA srbu G~ CNI~ SF~U NCNb RNRA 8FLU NCNb RNRA NCNb RNRA SrbU GR NCNb RNRA srbu NCNb RNRA NCNb RNRA 8FI,,U 1737'0000 4,6055 2,1680 12 ,6 3,8437 .999i~500 999 ,: ~:500 ,5~ 3 .214,1250 999,25'00 3,2109 : 9,2500 999,2500 ~,2129 116.6250 -999,2500 FCNI,, FCNi, GR NPHI FCNL NPH! rCNb NP~I FCNL NPH! NPH! FONt.. ibm NPH! FCN[, , NPHI -999. GE 2,3965 IbM 122,0000 NPHI -999,2500 rCNb -999,2500 GE 3,3t64 IbM 125.5625 NPHI -999,2500 FCN[, -999,2500 OR 3.3164 XI,~ 377,g000 1.'23. 625 1,9971 ,,O00, O 126,6250 2,9199 .999,2500 165~ ,~$O0 2i4,1250 . 2,i590 999'!~0° -999, O0 i34, 50 -999, O0 109, O0 . 2 .. 2285 '999,2 500 "999,2500 116,6250 1,8232 -999.2500 -999,2500 I5,43"/5 2.10i6 '999,2500 -999,2500 122.0000 .99; "9902 ,2500 -999 2500 125~5625 3.0352 D~MO CA~X ORHO CAbX DRHO CAbI CAbI IbD DRHO, CAbI DRHO ORHO II, D DRHO I bD DRHO CAbI DRH'O IbD 10.0000 ,, 2.8340 999,2500. 10,8203 2,1484 -99 ,. 8 11,1562 2,3477 '999,2500 10,19'S~ · '99 , 10, 8 11.0781 1,8691 ',999,2500 9,6797 2,0293 -999,,2500 10,3359 2,9277 "999,~$00 11. 203 2,9746 ~V~ O~O,HO~ V~IFIC'A?ION t~IST'ING PAGE ~P '41,5000 ~RAT "999,2500 RNRA )EPT 5500,~000 ~P.. -28, 25 ~HOB -99g.,~00 NCNB qRAT -ggg:,2500 RNRA )~PT 5400'0000 sr~u -ggg,~ O0 NCNL ~RA? mggg,2500 RNRA -28.812:5 GR ~r, s2oo,oooo $ } -30,2969 ~RAT 999,2500 RNRA DEPT 5100'0000 SP -29,8~37 OR RHOB -99g...2500 NCNb ~R:AT .~ggg~25.00 RNRA DE:PT 5~00..0000 SP, :29.6094 RHOB -99'9,2500 NCN~ ~RAT -999,2500 RNRA DEPT 4go0 0000 SFLU RHOB -999,2500 NRAT 'ggg.2500 RNRA DEP? 4B00,O000 ,,..AT -ggg,2500 RNRA ~EPT 4700.00~0 SFLU P .32,9{ 5 GR RHOB ogDg.2500 NRAT -999.2500 RNRA DEPT 4600.0000 SP -34.2487 GR RHOR -999.2 00 NCNb NR~T -999.2500 RNRA ggg.,2'500 ~9gg,2500 gOO:,2500 "ggg,2500 2,6172 191.6250 -ggg.*2500 -gDg.2500 ~'6924 108 0625 iO0 ;00 999,2500 -999,2500 2,294g .109.5625 .999;2500 999,2500 5 999~ 0 2,6328 -999.2500 -9'99.2500 9't, 75 '999,2500 '999,2500 2,B945 ~00,5000 ~999,2500 -999,2500 NPH! FCN[, FC~ FC~6 NPH! GE NPHI NPH! NPH! FCN6 GR NPH! FCN~ NPH! FCNL NPHI FCNL ggg.,25oo 'ggg'.~2500 183 6250 8418 -9 25000 1:?:0000 2,2402 ~999.2500 -999:2500 [9t.6250 999,2500 103,500o '2::SOO 999 2500 "9~ 2500 tog 5625 ,7'422 egg"CC ,{500 , 2,,7793 -g99,2500 'gg9,2500 113,0000 2'9141 -g99,2500 -ggg~2500 100.5000 DRHO CA~! L~D CALl I :b'D I)RHO C A L I ! D D~O CA~I DRHO CAL ! RHO DRHO CALl ILD DR[IO CALl DRHO CALl DRHO CALl ILD DRHO CA~I i 445 "ggg iO0 2,42t9 9,929? ,2500 .9g~'7.g4g 25 O:O ! ~ 4375 .99~".{02v 500 9,9922 -9 ,2500 ,1953 10:219'/ ~VP )EPT ~P tR AT ,~P ,~H'OB ~HOB ,~HOB ~EPT SP NR~T SP RHOB NRAT D~PT NRAT D~PT SP MRAT DF, PT RHO~ Ni~AT OIO,H02 VERIFXCATXON ,4~00,0000 ~36.,2187 2.2617 3;,4941, 4400,00~00 -39.0000 3t:45':,5469 ~$~0,'0:000 9,'i250 2,,2305 3'662:I 4~00,0000 41:,5625 3,539! 4100.0000 ,1797 ,:60.35 4~00 0000 ~613 °?° 680 3~00,0000 ~'8086 , 3700,0000 -47,2813 2.0234 3',9629 3 oo:.oooo 55'25)0 2. 3,7109 3500,0000 -57,2500 ,3359 .4082 U RN'RA N'CN[~ RNRA srl, u NCNL RNRA NC.b RNRA S~t,U R N R A NCNL GR RNR A SFt, U NC~L RNRA S F l.. U NCNb RNRA 8FI, U GR NCNb RNRA SFLU NCNL RNRi ~XSTIN~ 2,5586 IbM 9R,43'75 NPH! 1786,.0000 FCNb · 3'I:348 ~R ,2,7500 !1.9,3125 NPHX 1,947~'0000 FC'NL ],914! GR 2, :41 99't~0 IbM NPHI 96,7500 NPHI 1788:;:,00'0:0 3,7910 GR 'NP:.H:! '1861,0000 FCN~ 2,$680 ZDM ~2,3750 NPH! 1727,0000 rCNb 4,1953 GR 8~,4727 IbM · 6875 NPHI 1586,0000 FCNi,, 4.14~5 OR 2,4551 ibm ??.5000 NPH! 1613.0000 FCNL 4.0195 GR 86,2500 NPH! 1611.0000 FCNL ,5075 CR , NPH! . NPHX , , GR 569, 40,4297 119,:3t25 · 4 0 10( ' 46, 04,49 4i.i 5000 92 3750 382 $000 88 6'8?5 2,6 ~4 45,0 4~: 0488 8516 {58. 000 86,)900 6,2305 42.~75 415, O0 76,~250 5996 4~,7500 . ,1875 XbD DRHO CALX DRHO - ll, U DRHO CAt,! lbO... DRHO CALX DRHO CA, L! DRHO CAbI XLD DRHO CAL. X DRHO DRHO CALX XbD DRHO CALI PAGE 0,0229 3.I484 ! , 66 6,3203 0,0854 14,5625 4,6797 0,0522 10,0000 ,VP 010,H02 YE. IFICATION {,.,lc. TING PAGE {EPT ;P ~HOB )EPT ;P iRA? {RAT )BP? )EPT ~OB f)~PT SP NRAT NRA? r ',IT NRAT DEPT RHOB NRAT D£PT RHOB 3400,0000 -52,0625 2,3359 3,7383 3300,0 00 :-5~,5 O0 ,1562 4,0273' 3~oo..oooo 2,i758 3,5840 ,7500 .!309 ,81164 og!oooo ? 98 -59' o.ooo,o 9,0000 7656 2700,0000 -5~,0000 3.1406 ,8027 2600 O000 -64!0625 2 0488 3 9492 °°°° 5000 24 1969 2400 O000 -57~7500 2.1270 SFLU GR NCNb NCNb RNRA RNRA N C N b GR RNRA ~CNb 'RNRA 8~U GR N~N~ RNR~ S F b LI GR NCN~ RNRR aFLU GR NCNL RNRA NCNb RNRA 6~U NCnb 6,5469 BL.0000 1827.20000 4,3555 ,8437 ,0586 10,4766 .. 58,5938 I690,0000 4,2578 s's59~ 1495.0000 4,019'5 I0,9062 50,9062 1659,0000 3.6953 o ?832 1'.,3359 0000 2695 5000 12,4922 49.9687 4 6602 60' 1606 ,40'63 .0000 4,6016 7.7266 56.8125 160i.0000 NPH! FCN~ IbM NPH! FCNb GR NPH! FCNL G~ NPHI FCNb NPHI FCNb PHI FCNL IbM NPHI rCNb Ge IbM NPHI. FCNL GR NPHI rCN£, NPHI rCNL NDHI FCNL 6,4414 '45,0684 4~:~',25:00. ... ,0000 49'51i7 38?,5000 73,8125 1t,1641 43,45?0 396,7~00 58.5.38 40,9668 44897500 50,9062 8,$2$i 437,5000 ~ 39'06 4 ~4336 444'2500 52,0625 5,3438 4&,,7266 3~.~,7500 ,5000 t2j2'422 3~.~7500 49,9687 5t 95 4063 364~0000 T) R H C) CibI DRHO CALl: lbD DRHO CAb! DR:HO CAbI CAb! CAbI DRHO CAbI DRHO CAbI CALl I£,D DRHO CALl DRHO CALl 0:;, t079 1,1 ,, 1406 0.0303 9~5313 ~9,4453 1'1:,2813 ,o: 1, 541 ,2305 ~.0068 12,671q 12,6464 -0.0088 13,6464 7'~9!4 O, 0 4 16.2031 , 0~ 14,1953 NRA? DEPT NRAT oep? oo.oooo sru. SP, '60,2813 ~R, RHOB 1.9658 CNL NRAT 4,2031 RNRA SP.,, -4 78!3 RHOB .968 NPHI ..000~ ,S o IbM NPH! ** F,IbE ?RAIS£R F' t NAME i~DiT .00! DATE I ~.AXIMUM b~NGT~ FI~ TYPE 56,$t25 3, 'CAI:, I 20 O0 0000 DR=40 CA:b! 3 t: 2000 ~i,'0 I '0 '0 CALl i0,tt. 72 ** TAPE TRAIbER ** DATE :83/1t/1~ OR/GIN :0000 TAPE NAME 18718 CONTINUATION # :01 NEXT TAPE, NAME COMMENTS :TAPE COMMENT8 ** REEL TRAIhER ** VICE NAME :EDIT ..... E :83/11/18 ORIGIN : REEL NAME :REEL ID OONTINUATiON # ~0~ NEXT REEL NAME : COMMENTS =REEL COMMENTS EOF EOF **********