Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-083Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:205-083 6.50-029-21918-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 20113 20034 9043 13695 None None 8603 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 75 20" 39 - 114 39 - 114 Surface 3116 13-3/8" 39 - 3155 39 - 2692 4930 2720 Intermediate 12311 9-5/8" 38 - 12349 38 - 7844 6870 4760 Production 1741 7" 12180 - 13921 7742 - 8727 7240 5410 Perforation Depth: Measured depth: 14300 - 19650 feet True vertical depth:8949 - 9017 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13cr80 36 - 13751 36 - 8634 13695 8603Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S3 Packer Liner 6368 4-1/2" 13745 - 20113 8631 - 9050 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 2821276659200294 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Brian Glasheen Brian.Glasheen@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.5277 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9050 Sundry Number or N/A if C.O. Exempt: 320-546 No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Extended Perf w CTU Operations shutdown … Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028264 PBU W-07A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 394 2032 1450 1280 275 By Samantha Carlisle at 1:20 pm, Mar 25, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.03.25 12:22:04 -08'00' Stan Golis (880) DSR-4/1/21 MGR28MAR21 SFD 3/26/2021 ADL028263, ADL 047452 RBDMS HEW 3/25/2021 SFD 3/26/2021 ACTIVITY DATE SUMMARY 3/16/2021 CTU #9 - 2.0" Coil x 0.156" wall. Job Objective: Extended Length AddPerf. BOP Test and Pump 1.375" Drift ball in SLB yard due to winds. MIRU CTU. Freeze protect flowline with 9bbl of 60/40. Make up and RIH with 2.90" logging carrier and 3.25" JSN. ...Job Continued on 3/17/2021... 3/17/2021 CTU #9 - 2.0" Coil x 0.156" wall. ***Continued from 3/16/2021*** Job Objective: Extended Length AddPerf. RIH with 2.90" logging carrier and 3.25" JSN. Load well with 1% slick KCl with safelube. Log from 18400', flag at 15300' up to 13000'. Begin deploy gun#3 of 4. Drift to 18100ft. PUH to shot depth. ...Job in Progress... 3/18/2021 CTU #9 - 2.0" Coil x 0.156" wall. ***Continued from 3/17/2021*** Job Objective: Extended Length AddPerf. Perforate from 15,565'-15,765' w/ 2.88" maxforce perf guns. POH. Kill well and recover guns. All shots fired. While attempting to pressure test coil, discover coil is frozen from a leaking connector. Trim pipe, still have ice. Make up nozzle BHA and RIH to thaw coil. RIH to 9600ft to thaw ice plug inside coil. FP coil & POH. ...Job in Progress... 3/19/2021 CTU #9 - 2.0" Coil x 0.156" wall. ***Continued from 3/18/2021*** Job Objective: Extended Length AddPerf. Kill well. MU & RIH w/ perf BHA. Perforate 17920-18050 with HES 2.875" Maxforce, 6 spf. POOH. LD perf BHA - all shots fired. MU & RIH w/ perf BHA. ...Job in Progress... 3/20/2021 CTU #9 - 2.0" Coil x 0.156" wall. ***Continued from 3/19/2021*** Job Objective: Extended Length AddPerf. Continue to RIH w/ perf BHA. Perforate 15075-15325 with HES 2.875" Maxforce, 6 spf. POOH. Kill well and lay down gun #3. Make up and RIH with gun #4. Perforate 14460-14710 with HES 2.875" Maxforce, 6 spf. POOH. ...Job in Progress... 3/21/2021 CTU #9 - 2.0" Coil x 0.156" wall. ***Continued from 3/20/2021*** Job Objective: Extended Length AddPerf. Continue to POOH. Kill well and lay down gun #4. FP well. RDMO. ...Complete... Daily Report of Well Operations PBU W-07A 2SHUDWRU1DPH ([SORUDWRU\'HYHORSPHQW 6HUYLFH… …5 … 3HUPLWWR'ULOO1XPEHU $3,1XPEHU 358'+2(%$<358'+2(2,/ +LOFRUS1RUWK6ORSH//& )LHOG3RROV :HOO1DPHDQG1XPEHU $'/ 3URSHUW\'HVLJQDWLRQ /HDVH1XPEHU   3%8:$ ,ISHUIRUDWLQJ :KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO" :LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" 6WUDWLJUDSKLF &XUUHQW:HOO&ODVV 7\SHRI5HTXHVW$EDQGRQ …3OXJ3HUIRUDWLRQV …)UDFWXUH6WLPXODWH …5HSDLU:HOO … 2SHUDWLRQVVKXWGRZQ … 2S6KXWGRZQ *$6 … *6725…:$* … 63/8* … … $EDQGRQHG 2LO 5 :,1- … ([SORUDWRU\…'HYHORSPHQW 56WUDWLJUDSKLF……6HUYLFH :'63/… $WWDFKPHQWV 35(6(17:(//&21',7,216800$5<  (IIHFWLYH'HSWK0' FU   &RPPLVVLRQ5HSUHVHQWDWLYH  6XVSHQGHG … &RQWDFW1DPH %ULDQ*ODVVKHHQ &RQWDFW(PDLO EULDQJODVKHHQ#KLOFRUSFRP $XWKRUL]HG1DPH 6WDQ*ROLV $XWKRUL]HG7LWOH2SHUDWLRQV0DQDJHU $XWKRUL]HG6LJQDWXUH 3OXJ,QWHJULW\…%237HVW …0HFKDQLFDO,QWHJULW\7HVW …/RFDWLRQ&OHDUDQFH … 2WKHU <HV …1R …6SDFLQJ([FHSWLRQ5HTXLUHG"6XEVHTXHQW)RUP5HTXLUHG $SSURYHGE\&200,66,21(5 $33529('%<7+( &200,66,21 'DWH 52WKHU$OWHU&DVLQJ 3XOO7XELQJ … &RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU &200,66,2186(21/< ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRW EHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO 'HWDLOHG2SHUDWLRQV3URJUDP 3DFNHUVDQG66697\SH 1R6669LQVWDOOHG 3DFNHUVDQG66690' IW DQG79' IW  3HUIRUDWLRQ'HSWK0' IW 7XELQJ6L]H 6L]H 7RWDO'HSWK0' IW 7RWDO'HSWK79' IW   (IIHFWLYH'HSWK79'3OXJV 0' -XQN 0'  …2WKHU6WLPXODWH 5HHQWHU6XVS:HOO 6XVSHQG … …3OXJIRU5HGULOO 53HUIRUDWH …3HUIRUDWH1HZ3RRO  'DWH /LQHU    :HOO6WDWXVDIWHUSURSRVHGZRUN 9HUEDO$SSURYDO 5 … …&KDQJH$SSURYHG3URJUDP  (VWLPDWHG'DWHIRU&RPPHQFLQJ2SHUDWLRQV %236NHWFK  6WUXFWXUDO  3URSRVDO6XPPDU\:HOO&ODVVDIWHUSURSRVHGZRUN %DNHU63DFNHU   3URGXFWLRQ     &RQWDFW3KRQH   'DWH  &RQGXFWRU  …*,1- 5 3RVW,QLWLDO,QMHFWLRQ0,75HT G" <HV 1R … 5 …… … &RPP 67$7(2)$/$6.$ $/$6.$2,/$1'*$6&216(59$7,21&200,66,21 $33/,&$7,21)25681'5<$33529$/6 $$& 6XUIDFH  ,QWHUPHGLDWH        $GGUHVV&HQWHUSRLQW'U6XLWH $QFKRUDJH$.  …1R 5<HV &DVLQJ /HQJWK 0'79' %XUVW 7XELQJ*UDGH7XELQJ0' IW 3HUIRUDWLRQ'HSWK79' IW  &ROODSVH 0363 SVL  :HOOERUH6FKHPDWLF …  &RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ )RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO ([WHQGHG3HUIRUDWLQJ ZLWK&78 By Jody Colombie at 3:42 pm, Dec 31, 2020  'LJLWDOO\VLJQHGE\6WDQ*ROLV '1FQ 6WDQ*ROLV RX 8VHUV 'DWH   6WDQ*ROLV DSR-1/7/21 X MGR04JAN2021 10-404 DLB 12/31/2020 <HVLRQ5HTXLUHG" &RPP 1/7/2020 dts 1/7/21 JLC 1/7/2021 RBDMS HEW 1/11/2021 ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ tĞůůEĂŵĞ͗tͲϬϳ ĚĚWĞƌĨ W/EƵŵďĞƌ͗ϱϬϬϮϵϮϭϵϭϴϬϭ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚͲ/Ŷ ZŝŐ͗dhΘ^ƵƌĨĂĐĞ ĞƉůŽLJĞĚdW'ƵŶƐ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϬϭͬϮϬͬϮϬϮϭ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϯĚĂLJƐ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛ƐƚĚ͍EͬĂƚĞZĞŐ͘ƉƉƌŽǀĂůZĞĐ͛ǀĚ͗Eͬ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϬϱͲϬϴϯ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ƌŝĂŶ'ůĂƐŚĞĞŶ ϵϬϳϱϰϱϭϭϰϰ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ĂǀŝĚtĂŐĞƐ &EƵŵďĞƌ͗ϮϬϮϰϳϰϳ /KZ ϭϬϬ ƵƌƌĞŶƚŽƚƚŽŵ ,ŽůĞWƌĞƐƐƵƌĞ͗ϯϰϳϳ ƉƐŝ Λ ϴ͕ϴϬϬ͛dsϳ͘ϲ WW'ͮ ϭϮͬϭϯͬϮϬϮϬ DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϰϳϳ ƉƐŝΛϴ͕ϴϬϬ͛dsϳ͘ϲ WW'ͮ ǀĞƌĂŐĞ/ǀŝƐŚĂŬ,WͿ DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϱϵϳƉƐŝ ;ĂƐĞĚŽŶϬ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ >ĂƐƚ ^/ t,W͗ϭϳϲϯ ƉƐŝ ;dĂŬĞŶ ŽŶ ϭϮͬϭϯͬϮϬͿ DŝŶ/͗ϯ͘ϳϮϱ͟ /yE Λ ϭϯϳϯϵ͛ D DĂdžŶŐůĞ͗ϵϳ ĞŐΛ ϭϱϮϮϮ͛ ZĞĨĞƌĞŶĐĞ>ŽŐ͗ ^t^>t'ZͬZ^ ϭϭͬϬϱͬϬϱ dŝĞ/Ŷ >ŽŐ͗ Žŝů&ůĂŐϬϵͬϬϵͬϬϵ ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ ,ŝƐƚŽƌŝĐĂůůLJ͕tͲϬϳŚĂƐƉƌŽĚƵĐĞĚďĞƚǁĞĞŶϬ͘ϰĂŶĚϬ͘ϴďĂƌƌĞůƐŽĨĨůƵŝĚƉĞƌĨŽŽƚŽĨƉĞƌĨŽƌĂƚŝŽŶƐƵŶĚĞƌƐƚĂďůĞ ĐŽŶĚŝƚŝŽŶƐ͘ZĞĐĞŶƚůLJ͕ƚŚŝƐŚĂƐĚƌŽƉƉĞĚďĞůŽǁϬ͘ϮďĂƌƌĞůƐƉĞƌĨŽŽƚĂŶĚŝƚŝƐďĞůŝĞǀĞĚƚŚĂƚƐŬŝŶĚƵĞƚŽƐĐĂůĞŝƐƚŚĞ ĐƵůƉƌŝƚ͘^,WŽĨϯϰϳϳƉƐŝŽďƚĂŝŶĞĚŽŶϭϮͬϭϯͬϮϬϮϬĐŽŶĨŝƌŵƚŚĂƚƌĞƐĞƌǀŽŝƌƉƌĞƐƐƵƌĞŝƐŶŽƚƚŚĞŝƐƐƵĞ͕ĂŶĚĂĐŽŝů ĂĐŝĚũĞƚƚŝŶŐũŽďŝƐƉůĂŶŶĞĚƚŽƌĞŵŽǀĞƚŚĞƐĐĂůĞĂŶĚƌĞƐƚŽƌĞƉƌŽĚƵĐƚŝǀŝƚLJĨƌŽŵƚŚĞĞdžŝƐƚŝŶŐƉĞƌĨŽƌĂƚŝŽŶƐ͘ĨƚĞƌĐŽŝů ŝƐŽŶƚŚĞǁĞůůĨŽƌƚŚĞĂĐŝĚũŽď͕ĂŶĂĚĚŝƚŝŽŶĂůϰϰϬ͛ŽĨŶĞǁ/ǀŝƐŚĂŬƉĞƌĨŽƌĂƚŝŽŶƐǁŝůůďĞĂĚĚĞĚŝŶďLJƉĂƐƐĞĚƉĂLJ͕ ĂůŽŶŐǁŝƚŚϮϬϬ͛ŽĨŝůĞĞŶƉĞƌĨŽƌĂƚŝŽŶƐ͕ĂŶĚϮϮϬ͛ŽĨ/ǀŝƐŚĂŬƌĞͲƉĞƌĨƐ͘dŚĞŶĞǁ/ǀŝƐŚĂŬƉĞƌĨƐĂƌĞĂƐƐƵŵĞĚƚŽ ĐŽŶƚƌŝďƵƚĞϬ͘ϲďĂƌƌĞůƐƉĞƌĨŽŽƚĂƚĂŶŝŶŝƚŝĂůǁĂƚĞƌĐƵƚŽĨϳϱй͕ŝŶůŝŶĞǁŝƚŚŚŝƐƚŽƌŝĐĂůǁĞůůƉĞƌĨŽƌŵĂŶĐĞ͘dŚĞŝůĞĞŶ ƉĞƌĨŽƌĂƚŝŽŶƐĂƌĞĐŽŶƐŝĚĞƌĞĚƵƉƐŝĚĞ͕ĂŶĚƚŚĞďĂƐĞĐĂƐĞĂƐƐƵŵĞƐŝƚǁŝůůŶŽƚĐŽŶƚƌŝďƵƚĞ͕ŚŽǁĞǀĞƌƚŚĞůŽŐƐŚŽǁƐ ƚǁŽƌĞůĂƚŝǀĞůLJŐŽŽĚƐĂŶĚůŽďĞƐǁŝƚŚŝŶƚŚĞŝůĞĞŶƉĂĐŬĂŐĞ͘dŚĞ/ǀŝƐŚĂŬƌĞͲƉĞƌĨƐĂƌĞĂĚũĂĐĞŶƚƚŽƚŚĞŶĞǁ ƉĞƌĨŽƌĂƚŝŽŶƐďĞŝŶŐĂĚĚĞĚ͕ĂŶĚĐĂŶďĞƐŚŽƚŽŶƚŚĞƐĂŵĞŐƵŶƌƵŶ;ƐͿ͖ƚŚĞLJĂƌĞĂƌĞĚƵŶĚĂŶƚǁŝƚŚƚŚĞĂĐŝĚũŽď͕ďƵƚ ƚŚĞƌĞǁŝůůďĞďƌĂŶĚŶĞǁƉĞƌĨŽƌĂƚŝŽŶƚƵŶŶĞůƐ͕ĨƌĞĞŽĨĂŶLJƐĐĂůĞ͘/ŶŝƚŝĂůƌĂƚĞĨŽůůŽǁŝŶŐ ƚŚĞ ƉĞƌĨŽƌĂƚŝŽŶƐŝƐĞdžƉĞĐƚĞĚ ƚŽďĞďĞƚǁĞĞŶϭϯϬĂŶĚϯϳϬďŽƉĚĂƚĂϳϱйǁĂƚĞƌĐƵƚ͘ KďũĞĐƚŝǀĞ͗ hƐĞĐŽŝůƚŽ ĂĚĚŶĞǁƉĞƌĨŽƌĂƚŝŽŶƐ͘ ^ƵŶĚƌLJ WƌŽĐĞĚƵƌĞ ;ƉƉƌŽǀĂůZĞƋƵŝƌĞĚƚŽWƌŽĐĞĞĚͿ͗ EŽƚĞ͗ dŚĞǁĞůůǁŝůů ďĞŬŝůůĞĚ ĂŶĚŵŽŶŝƚŽƌĞĚďĞĨŽƌĞŵĂŬŝŶŐƵƉƚŚĞŝŶŝƚŝĂůƉĞƌĨƐŐƵŶƐ͘dŚŝƐŝƐ ŐĞŶĞƌĂůůLJ ĚŽŶĞ ĚƵƌŝŶŐ ƚŚĞĚƌŝĨƚͬůŽŐŐŝŶŐƌƵŶ͘ dŚŝƐǁŝůůƉƌŽǀŝĚĞŐƵŝĚĂŶĐĞĂƐƚŽǁŚĞƚŚĞƌƚŚĞǁĞůůǁŝůůďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐŽƌ ĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞũŽď͘ /ĨƉƌĞƐƐƵƌĞŝƐƐĞĞŶŝŵŵĞĚŝĂƚĞůLJĂĨƚĞƌƉĞƌĨŽƌĂƚŝŶŐ͕ŝƚǁŝůůĞŝƚŚĞƌďĞ ŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐǁŚŝůĞ WKK,ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵ ŐŚƚŚĞƐĂŵĞƉŽƌƚƚŚĂƚŽƉĞŶĞĚƚŽƐŚĞĂƌƚŚĞ ĨŝƌŝŶŐŚĞĂĚ͘ ŽŝůdƵďŝŶŐ ϭ͘ D/ZhŽŝůĞĚdƵďŝŶŐhŶŝƚ ĂŶĚƐƉŽƚĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͘ Ϯ͘ ƵůůŚĞĂĚ ϰϱϳ ďďůƐŽĨ ϴ͘ϰƉƉŐ ϭй<ůŽƌ ϴ͘ϱƉƉŐ ƐĞĂǁĂƚĞƌĚŽǁŶƚŚĞƚƵďŝŶŐƚŽƚŚĞĨŽƌŵĂƚŝŽŶ͘ ;dŚŝƐƐƚĞƉ ĐĂŶďĞƉĞƌĨŽƌŵĞĚĂŶLJƚŝŵĞƉƌŝŽƌƚŽŽƉĞŶͲŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨƚŚĞƉĞƌĨŐƵŶƐ͘dŝŵŝŶŐŽĨƚŚĞǁĞůůŬŝůůŝƐĂƚ ƚŚĞĚŝƐĐƌĞƚŝŽŶŽĨƚŚĞt^^͘Ϳ * ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ Ă͘ tĞůůďŽƌĞǀŽůƵŵĞсϮϬ͕Ϭϯϰ͛y͘ϬϭϱϮďƉĨс ϯϬϱ ďďůƐ ϯ͘ Dh ĂŶĚZ/, ǁŝƚŚůŽŐŐŝŶŐƚŽŽůƐĂŶĚ ĚƵŵŵLJŐƵŶ ĚƌŝĨƚ, ƚŽƌĞƐĞŵďůĞƉĞƌĨ ŐƵŶ͘ dĂŐWdƉƌŝŽƌƚŽ ůŽŐŐŝŶŐKK,͘ ϰ͘ WKK,ĂŶĚĐŽŶĨŝƌŵŐŽŽĚĚĂƚĂ͘ ϱ͘ ŽŶƚĂĐƚK ƉƌŝŽƌƚŽƉĞƌĨŽƌĂƚŝŶŐĨŽƌĨŝŶĂůĂƉƉƌŽǀĂůŽĨƚŝĞͲŝŶƐ͘ ϲ͘ &ƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘ ϳ͘ ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌĚĞƉůŽLJŵĞŶƚŽĨdWŐƵŶƐ͘ ϴ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘ůĞĞĚĂŶLJƉƌĞƐƐƵƌĞ ŽĨĨ ƚŽƌĞƚƵƌŶƚĂŶŬ͘ <ŝůůǁĞůůǁͬϴ͘ϰƉƉŐ ϭй<ůŽƌ ϴ͘ϱƉƉŐ ĂƐ ŶĞĞĚĞĚ͘ DĂŝŶƚĂŝŶĐŽŶƚŝŶƵŽƵƐŚŽůĞĨŝůůƚĂŬŝŶŐƌĞƚƵƌŶƐ ƚŽƚĂŶŬ ƵŶƚŝů ůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶŝƐƌĞĞƐƚĂďůŝƐŚĞĚ͘ ϵ͘ WŝĐŬƵƉ ƐĂĨĞƚLJũŽŝŶƚ ĂŶĚd/tǀĂůǀĞ ĂŶĚƐƉĂĐĞŽƵƚ ďĞĨŽƌĞDhŐƵŶƐ͘ZĞǀŝĞǁǁĞůůĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁ ƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐŵĂŬĞƵƉŽĨdWŐƵŶƐƚƌŝŶŐ͘ KŶĐĞƚŚĞƐĂĨĞƚLJ ũŽŝŶƚĂŶĚd/tǀĂůǀĞŚĂǀĞďĞĞŶƐƉĂĐĞĚŽƵƚ͕ŬĞĞƉƚŚĞƐĂĨĞƚLJũŽŝŶƚͬd/tǀĂůǀĞƌĞĂĚŝůLJĂĐĐĞƐƐŝďůĞŶĞĂƌƚŚĞ ǁŽƌŬŝŶŐƉůĂƚĨŽƌŵĨŽƌ ƋƵŝĐŬĚĞƉůŽLJŵĞŶƚŝĨŶĞĐĞƐƐĂƌLJ͘ ϭϬ͘ ƌĞĂŬůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂƚYd^ĂŶĚďĞŐŝŶŵĂŬĞƵƉŽĨdWŐƵŶƐ ĂŶĚďůĂŶŬƐ ƉĞƌ ƐĐŚĞĚƵůĞďĞůŽǁ͘ tͲϬϳ ĚĚƉĞƌĨ^ĐŚĞĚƵůĞ ƉĞƌdŝĞͲ/ŶůŽŐĚĞƉƚŚƐ WĞƌĨ/ŶƚĞƌǀĂů WĞƌĨ >ĞŶŐƚŚ 'ƵŶ >ĞŶŐƚŚ ϭϰϰϲϬͲϭϰϳϭϬ ϮϱϬ ϮϱϬ ϭϱϬϳϱͲϭϱϯϮϱ ϮϱϬ ϮϱϬ ϭϱϱϲϱͲϭϱϳϲϱ ϮϬϬ ϮϬϬ ϭϳϵϮϬͲϭϴϬϱϬ ϭϯϬ ϭϯϬ ϭϭ͘ Z/,ǁŝƚŚ ƉĞƌĨŐƵŶĂŶĚ ƚŝĞͲŝŶ͘WŝĐŬƵƉĂŶĚƉĞƌĨŽƌĂƚĞŝŶƚĞƌǀĂůƐ ƉĞƌWĞƌĨ^ĐŚĞĚƵůĞĂďŽǀĞ͘WKK,͘ Ă͘ EŽƚĞĂŶLJƚƵďŝŶŐƉƌĞƐƐƵƌĞĐŚĂŶŐĞŝŶt^Z͘ ϭϮ͘ WKK,͘ ^ƚŽƉĂƚƐƵƌĨĂĐĞƚŽƌĞĐŽŶĨŝƌŵǁĞůů ŝƐ ĚĞĂĚĂŶĚŚŽůĞ ŝƐ ĨƵůů͘ ϭϯ͘ ZĞǀŝĞǁǁĞůůĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐďƌĞĂŬĚŽǁŶ ŽĨdWŐƵŶƐƚƌŝŶŐ͘ ϭϰ͘ ZĞƉĞĂƚƐƚĞƉƐ ĂƐŶĞĐĞƐƐĂƌLJ ĨŽƌ ƐƵďƐĞƋƵĞŶƚŐƵŶƐ ƉĞƌ ĚĚƉĞƌĨ^ĐŚĞĚƵůĞĂďŽǀĞ͘ ϭϱ͘ ZDKdh͘ ϭϲ͘ ZdWŽƌ&WǁĞůů͘ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ƐͲďƵŝůƚ^ĐŚĞŵĂƚŝĐ Ϯ͘ Žŝů dƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ ϯ͘ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ ϰ͘ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ ϱ͘ dŝĞ/Ŷ>ŽŐ ϲ͘ DŝŶŝ>ŽŐ * See note above regarding kell methods if pressure observed on surface after perforating. Assure excess fluids available if needed to keep hole full. Standing orders flow chart included with this sundry request. ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ ƐͲďƵŝůƚ^ĐŚĞŵĂƚŝĐ ĚĚWĞƌĨ tͲϬϳ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ 337' New perforations. See previous page for existing perforations to stay open. ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ ŽŝůĞĚdƵďŝŶŐKWƐ ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ ^ƚĂŶĚŝŶŐKƌĚĞƌƐ ĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ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ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ dŝĞͲ/Ŷ>ŽŐ ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ DŝŶŝ >ŽŐ ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ ĚĚWĞƌĨ tͲϬϳ Wd͗ϮϬϱͲϬϴϯ +LOFRUS 1RUWK6ORSH//&+LOFRUS 1RUWK6ORSH//&Changes to Approved Work Over Sundry Procedure'DWH 'HFHPEHU6XEMHFW &KDQJHVWR$SSURYHG 6XQGU\3URFHGXUHIRU :HOO :$6XQGU\ $Q\PRGLILFDWLRQVWR DQ DSSURYHGVXQGU\ ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ &KDQJHVWRDQDSSURYHG VXQGU\ ZLOOEHFRPPXQLFDWHGWRWKH$2*&& E\WKHZRUNRYHU :2 ³ILUVWFDOO´HQJLQHHU $2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS3DJH'DWH 3URFHGXUH&KDQJH+163UHSDUHG%\ ,QLWLDOV +16$SSURYHG%\ ,QLWLDOV $2*&&:ULWWHQ$SSURYDO5HFHLYHG 3HUVRQDQG'DWH $SSURYDO$VVHW7HDP2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG)LUVW&DOO 2SHUDWLRQV (QJLQHHU 'DWH Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p~ ~~ - ©~ ~ Well History Fite Identifier Organizing (done) RES AN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: ,.o,,ed iuuiimuiiiuii DIGITAL DATA Diskettes, No. ^ Other, No/Type: . Re,~a~ ~eede< 111111111911Illlil OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: BY: Maria J Date: ~,] ~. ~ / (J ~j lsl Project Proofing Ill 111111 I I III I I III BY: Maria Date: 3 Q /s/ Scanning Preparation _,~ x 30 = ~~ + ~~ =TOTAL PAGES I , ~ ~ ~ ~ (Count does not i ~ dude cover she t) I n /~' BY: Maria Date: / ~( I Production Scanning Stage 1 Page Count from Scanned File: (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: _J~YES NO BY: Maria Date: _ LI 13~ ~ g /s/ ~/~/~ p vvv JJJ JJJ Y ' F Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I if ~~ ~l I II ~I I 1111 ReScanned III IfIINIIlII 11111 BY: Maria Dafe: /s/ Comments about this file: Quality Checked Ili ~I'III I~I (I'I ~II 10!6!2005 Well Nistory File Cover Page.doc I 0 /08/09 Schtmherger 1 (� NO. 5410 2 Alaska Data & Consulting Services r :•,r1�C� "y ,+.- �I r t� ,�+ 4DU9 Company: an State of Alaska P 2525 cambell street, Suite 400 Alaska Oil &Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job M Log Description Date BL Color CD MPC -05A 11661124 MEMORY PROD PROFILE 01/25/07 1 1-4.03 AY1M -00032 PRODUCTION PROFILE 09/09/09 1 LS -05 AP3Q -00061 PRODUCTION PROFILE OCOR 09/15/09 1 03 -24A AZCM -00042 LDL 09/14/09 1 07 -328 BOCV -00027 JEWELRY LOG/GR W /PRESSIfEMP 115/09 1 W -214 AY54 -00095 INJECTION PROFILE = 09/12/09 1 04 -26 BSJN -00014 PRODUCTION PROFILE / 09/25109 1 07 -21 AYS4 -00098 PRODUCTION PROFILE — 0,1 09/17109 1 W -04 BBK5-00003 PRODUCTION PROFILE — 09/24/09 1 1 -53 AP3Q -00060 PRODUCTION PROFILE — 09/13/09 1 843 AWLS -00037 PRODUCTION PROFILE 09/25/09 1 12 -23 AWL8-00035 INJECTION PROFILE 09/19/09 1 05 -38 AYTO -00029 LDL ION 09/18/09 1 W -29 AWJI -00050 MEM INJECT PROFILE 09120/09 1 W -30 AYIM -00034 PLUGBACK W/X -FLOW CHECK _ ( 09/12/09 1 3- 37/L -35 B3SQ -00024 PRODUCTION PROFILE 1.J 09/16/09 1 NK -09 AP3Q-00057 USIT 09/07/09 1 W -07A AWJI -00047 MEM CEMENT EVAL ATION 09/07109 1 11 -10 AYTU -00054 USIT 08/28/09 1 02 -068 ANHY -00111 USIT 09/21/09 1 G-1 8A AWJI -00048 MEM CEMENT BOND LOG G 09!17/09 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Slreet, Suite 400 900 E. Benson Blvd, Anchorage, AK 99503 -2838 �a • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate~ Other Q. Performed: Alter Casing ~ Pull Tubing~ Perforate New Pool ~ Waiver~ Time ~xterisioil~ Change Approved Program ~ Operat. Shutdown ~ Perforate Q Re-enter Suspended Well ~ 2. Operator BP Exploration (Alaska), Inc. 4. Weil Class Before Work: 5. Permit to Drill Number: Name: Development ~ Exploratory ^ 205-0830 ~ 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number: Anchorage,AK 99519-6612 50-029-21918-01-00 / 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO-028264 ~ PBU W-07A ~j 10. Field/Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL / 11. Present Well Condition Summary: Total Depth measured 20113 ~ feet Plugs (measured) None feet true verticai 9049.94 / feet Junk (measured) None feet Effective Depth measured 20034 ~ feet Packer (measured) 13675' true vertical 9043 ~' feet (true vertical) 8591 Casing Length Size MD ND Burst Collapse Structural Conductor 110 20" Surface - 110 Surface - 110 Surface 3155 13-3/8"68# L-80 Surtace - 3155 Surface - 2695 4930 4760 Intermediate Production 12349 9-5/8" 47# NT80S Surtace - 12349 Surtace - 7844 6870 4760 Liner 1740 7"26# L-80 12180 - 13921 7742 - 8727 7240 5410 Liner 6368 4-1/2" 12.6# 13CR-80 13744 - 20112 8630 - 9050 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13CR-80 SURFACE - 13751' SURFACE - 8634' Packers and SSSV (type, measured and true vertical depth) 7"X4-1/2" BKR S-3 PKR 13675' 8591 12. Stimulation or cement squeeze summary: Intervals treated (measured): .. :; k ~~ F i~~ i", t ~ ~ . ~ - Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 127 279 147 273 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X 16. Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 9/17/2009 ~ ~~,3 ~+r"9 ow~~mviiyuiaiviuy '~ ~~~: ~~"°{ :: jr;~; ~-g. ~ ~ la~ W-07A 205-083 PFRF OTTOCHMFNT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base W-07A 11/10/05 PER 18,780. 19,500. 9,007.5 9,006.8 W-07A 9/8/09 APF 15,950. 16,100. 8,968.83 8,994.56 W-07A 9/8/09 APF 16,930. `/ 17,195. 9,020.58 9,014.26 W-07A 9/10/09 APF 14,300. 14,600. 8,948.63 8,996.36 W-07A 9/10/09 APF 14,900. 15,405. 8,970.51 8,923.81 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE . We1lServiceReport WELL SERVICE REPORT ~ ~ Page 1 of 2 WELL JOB SCOPE UNIT W~O7A PERFORATING CTU #9 DATE DAILY WORK DAY SUPV 9/6/2009 DRIFT/TAG IMM COST CODE PLUS KEY PERSON NIGHT SUPV PBWPDWL07-C DS-WAGONER IGTANLOC MIN ID DEPTH TTL SIZE 3.725 " 13739 FT 4.5 " CTU #9 2.00" CT Job Scope: Extended Perforating with WWP. «<Continue from WSR 9/5/09»> Continue RU to WWP. RU complete, line up to test BOPE. Test BOPE RIH w 3.4" nozzle for a drift ran into a hydrate plug at 3650' and broke thru at 4200'. RIH to 17,405' and painted flag for SCMT logginq run & POOH "*"`Job continued on WSR 9/7/09""` LOG ENTRIES InitTb , IA, OA 1,333 1,667 TIME DEPTH TBG CTP BPM BBLS COMMENTS 00:00 0 Continue RU to WWP 01:02 0 Called AO wi our notice of startin BOP Test 01:04 0 AOGCC Bob Noble waived wifiessin the BOP Test 01:15 0 Mast is in the air PU in'ector and lubricator 02:30 0 Pre coii for CRC 03:10 0 Stabbed on to well, line u to fluid ack s stem for BOP test 03:53 0 34 Fluid acked, close choke for full bod test 04:10 0 Good low & hi h full bod tests. Bleed off and start recordin BOP Test 10:01 0 Com lete BOP test nad it went ood 10:30 0 M/U ctc 10:45 0 Pull test ctc to 30 k 11:00 0 PT MHA to 35 k 11:05 0 M/U stin ers and 3.4" nozzle 11:58 0 Stab on well 12:05 0 LPT 450 si 12:12 0 HPT 4000 si 12:29 0 1333 1272 O en master 23 turns 12:45 0 RIH W/ 2 stin ers & 3.4" nozzle 13:00 0 1300 1200 4.5 Pum down BS to knock down well head 14:00 2500 Havin trouble um in down back side 15:07 3600 1200 3886 1.9 190 Ta in u on ossible ice lu 'ettin on lu 15:11 3650 1096 1.9 190 /m wa o met ano s 15:40 3650 981 3759 1.8 242 Methanol at nozzle start makin hole 16:04 3774 326 3200 2 261 Swa back to 50/50 methanol 40 bbls 16:26 3813 813 3156 1.6 300 Swa back to KCL 16:42 3878 972 3440 1.6 326 Swa back to 50/50 methanol 20 BBLS 16:54 4000 1010 3284 1.7 346 Swa back to KCL 17:09 4200 769 640 1.7 369 Broke thru h drate lu 17:10 748 629 4 369 wa to um down w/ 2% KCL .06% safe lube 17:35 6100 1648 478 4 467 Swa to 50/50 down BS 5 bbis 18:33 10060 618 0 0 465 WT CK 24k continue bleedin IA 19:24 13507 688 0 0 WT CK 33.5k, RIH WT 13k 19:57 16028 731 123 0 WT CK 37k, RIH WT 20:22 17405 738 88 0 Sto and aint fla for SCMT(mech 17,421') IAP=1210psi OAP= s- 20:26 17405 798 63 0 POOH, s uirt .5 bbls 50/50 down return line while bleedin IA 23:43 3560 533 173 0 470 20 bbis of 50/50 still in coil if it didn't fall out. Come on line to fill coil or shut down 5 bbls awa from dis lacin all 50/50 23:59 2045 549 417 0.8 485 Continue POOH Final Tb , IA, OA JOB COSTS SERVICE COMPANY - SERVICE BAKER OIL TOOLS CH2MHILL LABOR HOT WATER PLANT http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default. aspx?id=4D212105EBAF4SE5... 9/17/2009 We1lServiceReport ~ MI FLUIDS ' ~ ORBIS SCHLUMBERGER SCHLUMBERGER PLUS 13 PERCENT WAREHOUSE WELLWORK PLATFORM KLONDIKE NORTHERN SOLUTIONS SCHLUMBERGER PLUS 15 PERCENT WS DISPATCHED TOTALF 290 bbls 2% KCL w/ SafeLube 20+40+20+5 bbls 50/50 Methanol PerFormed visual tank inspection on retum tanks 73117 73103 T-20 ~ 2 of 2 http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default. aspx?id=4D212105EBAF45E5... 9/17/2009 We1lServiceReport WELL SERVICE REPORT ~ ~ Page 1 of 2 WELL JOB SCOPE UNIT W-O7A PERFORATING CTU #9 DATE DAILY WORK DAY SUPV 9/7/2009 CEMENT BOND ~OG-SCMT/USIT IMM COST CODE PLUS KEY PERSON NIGHT SUPV PBWPDWL07-C DS-WAGONER IGTANLOC MIN ID DEPTH TTL SIZE 3.725 " 13739 FT 4.5 " Nozzle BHA and MU SCMT Logging tools Load well & RIH. Log with SLB SCMT from 17400' to 13600' Laying in flo pro . OOH cap well for no flow test and check for data. Good data but well flowing at .4 bpm shut in and monitor WHP. Pressure stabilized at 35psi open choke and well finally bled down after -16 bbls, formation was just charged up a little. *'*Job continued on WSR 9/8/09**" LOG ENTRIES Init Tb , IA, OA 544 523 0 TIME DEPTH TBG CTP BPM BBLS COMMENTS 00:00 2045 544 411 0.8 485 Continue POOH 00:10 1271 541 411 0 493 Cau ht fluid, shut down um 00:21 289 576 404 1.3 494 Retum line frosted over pump 50/50 to tank the pump a few bbls down backside. WHP climbed -120 si in the last 1000' 00:28 50 668 401 0 499 WHP climbed to 870psi and leceled off. Shut down the pump and WHP dro s ri ht off to 660 si 00:31 0 652 396 Start swab checks, PU 18'. Swab closed, bleed off 00:38 0 PU in'ector and brin to back deck 00:46 0 LD Nozzle BHA 00:57 0 PU additional lubricator for lo in tools 01:14 0 PJSM to MU SWS SCMT Lo in tools 01:26 0 3500 PT MHA 02:00 0 PU the 2nd half of the SCMT with WWP Crane 02:27 0 499 Stabbed on, line u to fluid ack & PT 02:39 0 Fluid ack stack 02:42 0 282 255 503 LPT 02:50 0 4059 4057 504 HPT 02:55 0 4047 Good test bleed off to -600 si and o en swab 03:02 0 768 472 2.2 0 Online down backside with 10 bbls of 50/50 03:06 0 744 472 5.1 7 Swap to 2% KCL (3 bbls late on the zero) IAP=485psi OAP= Opsi Bleedin off IAP to Tf 03:27 0 1855 465 4.4 111 Pressure climbin reduce rate IAP= 338 si OAP= 35 si 04:14 0 1984 449 3.6 310 Swa to 2% KCL w/ SafeLube 04:17 0 821 450 0.5 325 Reduce rate to RIH then continue dis lacin well 05:19 3680 1600 1028 0.5 450 Reduce rate IAP= 168 si OPA= 35 si 06:40 10000 884 881 0.6 499 Wt ck 22 k 07:49 15000 859 756 0.6 540 Wt ck 30 k 08:24 08:26 17405 798 764 807 778 0.6 0.7 561 5 At fla start lo in u w/ SLB SCMT lo in tool o in is avm rou e wi e com er 09:08 17388 758 778 0.8 593 Start lo in u 30 f m 11:13 13600 684 693 0.8 693 Sto for lo 11:16 13600 694 722 0.8 996 RBIH for a re eat lo 12:12 17384 847 801 0.8 740 Sto at fla 12:15 17384 823 813 0.8 742 Start lo in u 30' f m 12:32 16900 758 853 0.8 756 Sto and aint a white fla 12:3fi, 16900 761 863 0.8 759 Continue lo in 12:56 16300 740 886 0.8 776 Continue lo in u 30 f m 13:25 14800 703 898 0.8 0 flo Sto count for lo & swa to flo ro down coil 13:30 14800 586 1127 0.8 1 Start lo in u 30 f m from 14800 14:05 13800 1168 3878 1.8 52 Sto lo in & bull head 40 bbls of flo ro into well bore 14:43 13800 1241 3092 1 93 POOH la in in the remainin 65 bbls of flo ro 1:1 14:57 12890 975 3153 1 107 Swa to KCL 17:57 0 Start swab checks 18:10 0 Master closed 23 turns 18:13 0 Po off well http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default.aspx?id=199B 14A278064308... 9/17/2009 We1lServiceReport Page 2 of 2 ' ~ ~ 18:30 0 LD lower half of lo in tool ~ 18:50 0 We have data 19:09 0 3535 Line u to PT MHA 19:16 0 PJSM with ni h't crew 19:26 0 135 O en master to closed choke to check for ressure 19:30 0 135 O en choke & bieed off WHP 19:35 0 Well flowin back at -0.5 b m 19:58 0 PJSM with TCP to sta e uns and tools on the round and WWP 20:05 0 SCMT data bein sent to SLB town en ineer 20:11 0 Load TCP e iu ment on WWP 21:08 0 Well still flowin back at .25 to .3 bpm shut in choke after getting back 16-18 bbls in 1 hr 20min 21:38 0 28 Well continuing to build pressure call CT scheduler and we are going to try bleed ing off the remaining 150psi from the IA and check the return rate a ain 21:58 0 32 IAP & WHP dropping we'll see what the flow rate looks like when its bled down 22:46 0 28 IAP bled off, shut in IA and open up to bleed off WHPand monitor flow 23:03 0 Retums are down are slowin down, swa to 40 bbl tank 23:45 0 Well is dead, continue Perf OPS with PJSM to et started 23:59 0 s i ro ramin E-Fire Head Final Tb , IA, OA http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default.aspx?id=199B 14A278064308... 9/17/2009 FLUID SUMMARY 107 bbls Flo Pro 310 bbls 2% KCL 466 bbls 2% KCL w 0.6% safelube 10 bbls 50/50 Meth We1lServiceReport WELL SERVICE REPORT ~ ~ Page 1 of 2 WELL JOB SCOPE UNIT W~O7A PERFORATING CTU #9 DATE DAiLY WORK DAY SUPV 9/8/2009 PERFORATING; CEMENT BOND LOG--SCMT/USIT IMM COST CODE PLUS KEY PERSON NIGHT SUPV PBWPDWL07-C DS-WAGONER IGTANLOC MIN ID DEPTH TTL SIZE 3.725 " 13739 FT 4.5 " CTU #9 2.00" CT Job Scope: Extended Perforating with WWP. «<Continue from WSR 9/7/09»> Continue Perf OPS, SWS programing eFire Head. PJSM discuss HARC for Perf OPS and line out roles and responsibilities. MU PerF Run #1 300' 2.50" 4spf 2506PJ Omega Perf Guns with blanks. Ran Safety Joint Drill after 5th gun. RIH with Perf Run #1 to flag. Gun run #1 RIH to flag & Correct to flag and shoot top shot at 16930' bottom shot 17195' At surface confirm all shots fired on gun run #1. MU Gun run #2 and RIH, Stop at flag and correct depth to top shot. PU to 15950', fire guns and POOH *'*Job continued on WSR 9/9/09**" Perf Data 2.50" 4spf 2506PJ Omega Perf Guns Top Depth (ft) Btm Depth (ft) Gun Dia (IN) Orientaion Flag Shot Density (SPF) Shot Phase 15950 16100 2.5 Yes 4 60 16930 17195 2.5 Yes 4 60 LOG ENTRIES Init Tb4. IA. OA 0 7 0 TIME DEPTH TBG CTP BPM BBLS COMMENTS 00:00 0 Well is dead & SLB is ro ramin the E-Fire Head 00:06 0 PJSM with all ersonnel on location to run uns and monitor flow back tank while runnin uns 00:33 0 Add swivel to MHA and PT before we et started 00:51 0 3456 PT MHA with Swivel, good PT. Crown out injector and prep to start runnin uns 01:24 0 MU Guns 01:54 0 5 Guns in Safe Joint Drill. Continue runnin uns 02:58 0 Guns ran, MU swivel to eFire Head 03:20 0 Stabbed, line u to take returns 03:30 0 BHA= CTC (2.00" X 0.30'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'), eFire Head (1.71" x 6.30'), Pert Guns (2.5" x 276.09') OAL = 305.14' 03:32 0 RIH 05:33 10077 WT CH 24k 07:07 16886 At fla + 36.7' correction correct to 16922.7' 07:29 16922 RIH ast shootin de th 07:47 16930 Sto at shootin de th c cle um to set firin head 08:12 27 0.4 0 .5 sp 2506PJ mega Perf Guns fired i I well down BS with 2°/a KCL w/ safelube 12:31 0 64.5 At surface preform PJMS ABOUT LAYING GUNS DOWN with all ersonal on location 12:46 0 Preform no flow test for 30 mins 13:18 0 64.5 i o e wi c ar e um we o0 1.7 bbls to fill 13:24 0 66.2 Po off well and break out de lo ment bar 14:39 0 68.3 Fill well took 2.1 bbls 16:20 0 All uns are out o o e 16:21 0 70.5 Fill hole w/ 2% KCL 2.5 bls to fill the hole 16:25 0 Start fo M/U un run #2 17:36 0 M/U E- fire firin head & and de lo ment 'oint 17:40 0 PT coil connector to 3500 si 18:05 0 M/U to the de lo ment 'oint & uns with baker swivel 18:09 0 BHA= CTC (2.00" X 0.30'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'), eFire Head (1.71" x 6.30'), Perf Guns (2.5" x 170.04') OAL = 199.09' 18:10 0 Stab on well & RIH http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default. aspx?id=CD6574B9278B4A05... 9/ 17/2009 We1lServiceReport Page 2 of 2 ~ ~ ~ 18:15 0' Crew chan e 20:38 11000 2 0 WT CK 25k 21:48 16521 7 0 WT CK 36kk, RIH WT 14k 22:00 16900 7 0 Stop at White Flag (mech 16,916') correct to EOP + length to Top Shot 22:03 16931.6 Correct de th to To Shot 22:10 16931 7 0 PU to to shot de th of 15 950' 22:30 15950 0 0 0 Pum down coil to confirm its full 22:36 15950 12 828 4 Coil is full, start ressure se uence to fire uns 22:55 15950 6 80 18 2.50" 4spf 2506PJ Omega Perf Guns fired, line up to fill hole down backside and POO XXX bblS il0 pf0 20+15 bbis 2°/a KCL 69+15 bbls 2% KCL w/ 0.6% safelube Performed visual tank inspection on return tanks 73117 73103 T-20 Run #1 BHA= CTC (2.00" X 0.30'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'), eFire Head (1.71" x 6.30'), Perf Guns (2.5" x 276.09') OAL = 305.14' Run #2 BHA= CTC (2.00" X 0.30'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'), eFire Head (1.71" x 6.30'), Perf Guns (2.5" x 170.04') OAL = 199.09' PERFORATIONS TOP DEPTH BOTTOM DEPTH GUN DIAMETER ORIENTATION SHOT DENSITY SHOT PHASE 15,950 16,100 2.500 Y 4.00 60 16,930 17,195 2.500 Y 4.00 60 http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default.aspx?id=CD6574B9278B4A05... 9/17/2009 ~ Final Tbg, IA, OAI I I I Wel~ServiceReport WELL SERVICE REPORT ~ ~ Page 1 of 2 WELL JOB SCOPE UNIT W-O7A PERFORATING CTU #9 DATE DAILY WORK DAY SUPV 9/9/2009 PERFORATING; JEWELRY LOG-DEPTH CONTROL IMM COST CODE PLUS KEY PERSON NIGHT SUPV PBWPDWL07-C DS-WAGONER IGTANLOC MIN ID DEPTH TTL SIZE 3.725 " 13739 FT 4.5 " CTU #9 2.00" CT Job Scope: Extended Perforating with WWP. «<Continue from WSR 9/8/09»> Continue POOH. Stop at 133' for No-Flow Test and hold PJSM with all personnel on location. No-Flow test is good. Pull Perf Guns checking hole fill every 30 min. We have holes. Load out perf guns and prep to cut pipe and rehead Cut 100' of coil for pipe managment. RIH w/ PDS GR CCL and log from 15600' to 13600' paint a flag at 14900' and 14300'. OOH with good data correct depth +12'. MU Gun Run #3 and RIH **"Job continued on WSR 9/10/09*"* LOG ENTRIES Init Tb , IA, OA 19 7 0 TIME DEPTH TBG CTP BPM BBLS COMMENTS 00:00 12223 19 6 31 Continue POOH 02:31 215 41 0 88 Shut down um , over dis laced b 8 bbls while POOH 02:32 133 35 0 Stop 100' in hole to perform No-Fiow test and have PJSM to LD s ent Guns 02:49 133 0 0 Start No-Flow Test 03:19 133 0 0 0 Good no-flow test. line up to pump fluid across top to see if the well is takin fluid 03:25 133 0 0 .5 It took the normal .5 bbls to get flow to the 40 bbl, well is full and we are ready to go as soon as we get the variance for the crane that i cailed for at 10:30 last ni ht 04:06 133 0 0 .5 Variance is on location line u to see if well is takin fluid 04:10 133 2.0 Well took 1.5 bbis, continue POOH fillin hole eve 1/2 hr 04:18 0 0 0 OOH, check White & PU in'eetor. Continue POOH 04:27 0 eFire Head at surface 04:37 0 2.1 Fill hole 04:41 0 3.8 Hole is full 04:44 0 We have holes 05:24 0 5.4 Guns OOH, fill hole and close master 05:46 0 uns o oaded, re to LD lubricator & cut i e 06:40 0 Start cuttin i e 100' 07:20 0 M/U coil conn 07:28 0 Pull test to 30 k 07:48 0 Fill coii to PT coil conn 07:55 0 PT MHA to 3500 si 08:08 0 M/U PDS lo in tool 08:22 0 Stab on well 08:33 0 LPT 500 si 08:38 0 HPT to 4000 si 08:43 0 O en master 23 turns 08:46 0 It~H w/ baker MHA ctc 3.13"x 0.95' xo 3.13"x 0.76' dcv 2.13"x 1.38' h dr disc 2.13"x 1.56' PDS carrier 2.20"x 10.35' OAL = 15.00' 11:31 11000 19 2047 1.5 Start fresh flo ro down coil 12:32 15600 744 2987 1.5 64 o an u ead lo ro 40 bbls 12:55 15600 0 1300 0.6 96 Start lo in u 40 f m la in in fresh flo ro 13:14 14900 7 1160 0.7 108 Sto and aint a fla ellow & red 13:21 14900 4 1047 0.6 108 Continue lo in u 40 f m 13:36 14300 6 865 119 Sto & aint a second fla white and blue 13:39 14300 6 835 0.6 119 Continue lo in u 40 f m 13:57 13600 8 636 0.6 131 Sto lo in wait 5 mins 14:03 13600 29 33 0.3 0 POOH fillin hole down BS 17:10 500 Stop pulling OOH the HCR valves closed on the stack a breaker tri ed called for a electrician 17:36 0 64.2 At surtace make sure the hole is full close master valve 23 turns 17:49 0 UD PDS lo in tools check for data 18:11 0 Pre to load uns on VWVP 18:26 0 +12' correction for EOP Flag, CH2 electricians looking at breaker http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default. aspx?id=COBA983522AD4B0... 9/17/2009 Well,ServiceReport Page 2 of 2 ~ anel 19:18 0 PJSM to load guns oin platform and line out roles and res nsibili s 19:38 0 Install ni ht ca and o en master to a closed choke 19:43 0 64.2 Fill hole 19:48 0 65.1 Hole is full 19:50 0 Control Panel fluid level is low so it wouid not pressure up so the pump continued to pump causing the breaker to over heat and trip. Fiil h d reservoir 20:19 0 Panel is full and workin , start loadin uns onto WWF 20:55 0 65.1 Guns loaded, remove ni ht ca and fill hole 21:09 0 67.9 Hole is full, start runnin uns 22:31 0 Guns made u, PT MHA 22:45 0 3535 Good PT, bleed off & MU swivel to de lo ment bar and stab on 23:14 0 RIH BHA= CTC (3.13" X 0.95'), X-O (3.13" x 0.76'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'), eFire Head (1.71" x 6.30'}, Perf Guns (2.5" x 532.27' OAL = 561.07' 23:59 4175 0 28 Continue RIH Final Tb , IA, OA tSU DDIS TIO pf0 53 bbls 2% KCL 64 bbls 2% KCL w/ 0.6% safelube Performed visual tank inspection on return tanks 73117 73103 T-20 Run #1 BHA= CTC (2.00" X 0.30'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'), eFire Head (1.71" x 6.30'), Perf Guns (2.5" x 276.09') OAL = 305.14' Run #2 BHA= CTC (2.00" X 0.30'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'), eFire Head (1.71" x 6.30'), PerF Guns (2.5" x 170.04' OAL = 199.09' _ http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default. aspx?id=COBA983522AD4B0... 9/17/2009 W~11S~rvaceReport WELL SERVICE REPORT ~ e Page 1 of 2 WELL JOB SCOPE UNIT W-O7A PERFORATING CTU #9 DATE DAILY WORK DAY SUPV 9/10/2009 PERFORATING IMM COST CODE PLUS KEY PERSON NIGHT SUPV PBWPDWL07-C DS-WAGONER IGTANLOC MIN ID DEPTH TTL SIZE 3.725 " 13739 FT 4.5 " CTU #9 2.00" CT Job Scope: Extended PerForating with WWP. «<Continue from WSR 9/9/09»> Continue RIH. Stop at 14300' EOP flag and record depths, continue in hole with 2.50" 4spf 2506PJ Omega Perf Guns to 14,900' flag and correct to top shot. PU to 14,900' ctmd to fire guns. Looks like the guns fired, POOH. RIH w/ gun run #4. RIH ro 14300' flag correct depth to top shot and shoot with top shot at 14300". POOH freeze protecting well to 2500' with 38 bbls of 50/50 Meth. OOH with all shots fired. RD GBR & SWS **'Job continued on WSR 9/11/09*" Perf Data 2.50" 4spf 2506PJ Omega Perf Guns Top Depth (ft) Btm Depth (ft) Gun Dia (IN) Orientaion Flag Shot Density (SPF) Shot Phase 14300 14600 2.5 Yes 4 60 14900 15405 2.5 Yes 4 60 LOG ENTRIES Init Tbp. IA. OA 0 8 0 TIME DEPTH TBG CTP BPM BBLS COMMENTS 00:00 4175 0 28 Continue RIH 01:12 10000 0 0 WT CK 25k, RIH WT 12k IAP= 8 si OAP= 0 si 02:18 14864.5 0 17 Stop at upper flag to record mechanical depth (Electronic EOP 14,303.5 Mech 14,313' 02:30 15463.7 0 17 Stop to correct depth to top shot (Electronic 14902.7' Mech 14,914' 02:34 14955.7 0 17 0 Line u fluid ack coil and PU to to shot de th PU WT 36k 02:44 14900 0 17 0 Start pressure sequence to fire 2.50" 4spf 2506PJ Omega Perf Guns 02:59 14900 0 64 12.7 Looks like uns fired POOH fillin hole down the backside 03:10 14303 0 28 16.4 14 a is in oo condition continue POOH 06:29 140 86 Start no flow test for 30 mins 06:46 0 PJSM with all ersonal on location about la in down uns 07:05 0 1.4 PUH and fill hole 1.4 bbls to fill the hole 07:33 0 Start la in uns down 07:42 0 2.6 Fill the hole 1.2 bbls to fill hole 07:45 0 Confirmed that uns fired 08:22 0 4.2 Fill the hole 1.6 bbls to fill hole 09:01 0 6.1 Fill the hole 1.9 bbls to fill hole 09:25 0 7.1 Guns are out of the hole fill the hole 1 bbl to fill the hole 09:30 0 oa uns or run onto the VW1IP 09:47 0 7.7 Fill the hole 0.6 bbls to fill the hole 09:50 0 Start runnin uns for run #4 10:40 0 All the uns are in the hole 10:48 0 Line u& fill coil w/ KCL 11:01 0 PT MHA to 3800 si 11:07 0 M/U swivel to uns 11:16 0 Stab on well 11:18 0 RIH w/ Baker ctc 3.13"x 0.95' xo 3,13x 0.76' dcv 2.13"x 1.38' hyd disc 2.13"x 1.56' swivel joint 2.13"x 1.34' deployment bar 2"x 17.51' CBF firing head 2.13"x 3.59:perf guns 2.5"x 318.3' OAL = 345.39' 13:50 10500 2 Wt ck 26 k 14:30 13660 3 Wt ck 34 k 14:41 14310 2 At fla correct to to shot + 35 ' with a de th of 14345' 14:47 14345 7 1054 1.2 10 Come online with flo ro for 10 bbls 14:55 14345 Load 1/2" aluminum ball 14:59 14345 2 1373 1.3 Launch 1/2" aluminum ball PUH to 14300' to shot 15:44 14300 55.7 Ball on seat 2.50" 4spf 2506PJ Qmeqa PerF Guns fired at 2553 si http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default.aspx?id=2D27E65FFC034845... 9/17/2009 We1lServiceReport ~ i Page 2 of 2 15:45 14300 POOH fillin hole down BS ~ 16:54 10000 14 0 Start 50/50 19:04 580 127 0 0 38 Shut down pump to let WHP bleed off to formation, well FP to 2500' 19:10 170 9 0 Sto below surface to erform 30 min no-flow test 19:20 170 0 0 Start no-flow test. We are 304psi over balanced with 50/50 Meth on the backside 19:55 170 No Flow Test ood, hole took 1.1 bbls, POOH 20:05 0 0 0 OOH 20:10 0 PU in'ector, break swivel connection and et in'etor out of the wa 20:21 0 RU elevators to re for ullin uns 20:29 0 BO firin head, tra ed ressure and a little H2S 20:50 0 Continue ullin uns 21:52 0 Guns OOH, close master & off load GBR e ui ment 22:30 0 oa s en uns for WWP 23:50 0 Guns off loaded, cool down N2 Pum 23:59 0 Stab on to blow down reel Final Tb , IA, OA 0 8 0 JOB COSTS SERVICE COMPANY - SERVICE CH2MHILL LABOR GBR MI FLUIDS ORBIS SCHLUMBERGER SCHLUMBERGER PLUS 13 PERCENT WAREHOUSE WELLWORK PLATFORM KLONDIKE BAKER OIL TOOLS NORTHERN SOLUTIONS WS DISPATCHED HOT WATER PLANT PDS SCHLUMBERGER PLUS 15 PERCENT TOTAL FIELD ESTIMAT' 7+38 bbls flo pro 56 bbls 2% KCL 94 bbls 2% KCL w/ 0.6% safelube Performed visual tank inspection on return tanks 73117 73103 T-20 Run #1 BHA= CTC (2.00" X 0.30'), DBPV (2.13" x 1.38'), Hyd Disco (2.13" x 1.56'), Swivel (2.13" x 1.34'), Deployment Bar (2.00" x 17.51'1. eFire Head (1.71" x 6.30'l. Perf Guns (2.5" x 276.09'1 OAL = 305.14' PERFORATIONS TOP DEPTH BOTTOM DEPTH GUN DIAMETER ORIENTATION SHOT DENSITY SHOT PHASE 14,300 14,600 2.500 Y 4.00 60 14,900 15,405 2.500 Y 4.00 60 http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default.aspx?id=2D27E65FFC034845... 9/17/2009 We1lServiceReport . WELL SERVICE REPORT ~ ~ Page 1 of 1 WELL JOB SCOPE UNIT W-O7A PERFORATING CTU #9 DATE DAILY WORK DAY SUPV 9/11/2009 PERFORATING; RIG DOWN IMM COST CODE PLUS KEY PERSON NIGHT SUPV PBWPDWL07-C DS-WAGONER IGTANLOC MIN ID DEPTH TTL SIZE 3.725 " 13739 FT 4.5 " DAIL I CTU #9 2.00" CT Job Scope: Extended Pertorating with WWP. «<Continue from WSR 9/10/09»> Stab onto well to blow down reel. Reel blown down Continue RDMO to shop for planned maintenance *"*Job Complete*** LOG ENTRIES Init Tb , IA, OA 0 8 0 TIME DEPTH TBG CTP BPM BBLS COMMENTS 00:00 0 Stab onto well 00:15 0 Fluid ack backside to PT lubricator 00:27 0 N2 Pum er ri ed u, PJSm to blow down reel 00:41 0 PT N2 Line 00:45 0 Good PT, start 01:01 0 Shut down N2 & bleed off 01:30 0 Continue RD CTU 06:59 0 CTU at sho for lanned maintenance Final Tb , IA, OA 0 8 0 FLUID SUMMARY Pu_mped 258 gals of N2 (24,000 sc~ http://apps2-alaska.bpweb.bp.com/awgrs-wellservicereport/default. aspx?id=285A7EFF7BF340EB ... 9/17/2009 STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~N 1. Operations Abandon ~ Repair Well ~ Piug Perforations ~ Stimulate0_ ther Performed: p~~'~~~r'~~ Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension ~ Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well ~ 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: rvame: Development ~- Exploratory ~ 205-0830 - 3. Address: P.O. Box 196612 Stl"dtlgfaphlC r S@I'VIC@ ~ 6. API Number: Anchorage, AK 99519-6612 50-029-21918-01-00- 7. KB Elevation (ft): 9. Well Name and Number: 81.64 KB - PBU W-07A _ 8. Property Designation: 10. Field/Pool(s): ADLO-028264 ~ PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Weil Condition Summary: Totai Depth measured 20113 - feet Plugs (measured) None true verticai 9049.94 - feet Junk (measured) None Effective Depth measured 20034 ~ feet true vertical 9043 ' feet Casing Length Size MD ND Burst Collapse Conductor 110 20" Surface - 110 Surface - 110 Surface 3155 13-3l8"68# L-80 Surface - 3155 Surface - 2695 4930 2270 Production 12349 9-5/8" 47# NT80S Surtace - 12349 Surface - 7844 6870 4760 Liner 1740 7" 26# L-80 12180 - 13921 7742 - 8727 7240 5410 Liner 6368 4-1/2" 12.6# 13CR80 13744 - 20112 8630 - 9050 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR-80 SURFACE - 13751' 0 0 - Packers and SSSV (type and measured depth) 7"X4-1/2"" BKR S-3 PKR 13675' . . ... . _.._ _... ... _ , 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): ) ~ ~ kG f `~ ~ ~ ... , P_ . ~.. z,~ ~ ~~,: ,~,. • S~:'' d1 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 168 116 67 269 Subsequentto operation: 150 123 57 281 14. Attachments: 15. Well Class after aroposed work: Copies of Logs and Surveys Run Exploratory ~ De~elopment ~', - S211AC@ ~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~~ Gas ~ WAG ~ GINJ ~~ WINJ ~ WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 8/17/2009 ~ ~ ~ ~ ~ i~ ~ 1, ~.~E~~ ~~ '~ ~~~ ~ 7 ~G~~~ REPORT OF SUNDRY WELL OPERATIONS = ,.~ ~ Form 10-404 Revised 04/2006 ~ 'p' f E ,~, ~~~ ,l ; Cg r1~~+ Sub ' rig~ina/l Only ~tlt G'~ ~/~` W-07A 205-083 PFRF OTTOrHMFNT • Sw Name Operation Date Perf Operation Code -- - - Meas Depth Top - - Meas Depth Base Tvd Depth Top Tvd Depth Base W-07A 11/10/05 PER 18,780. 19,500. 9,007.5 9,006.8 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICA~ ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ ~ ~ W-07A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY _ _ ; 8/6/2009 ASRC Test Unit #2, Rig up, stand by for Acid Stim Ops. ***Job in Progress''''* ~ ~ ~__ ~ ___..___.~. __ __.__. . _~~ _ e_ ~~ ~ 8/7/2009 ASRC Test Unit #2, Stand by for Acid Stim, ""*Job in Progress**'" ~ __mm__..~_ _ _ . ..._..,_. _ ~ _.__.._._ . __... _____.____.______ ~__. _ ___..______. ~.~ .__ 8/8/2009 LRS Unit 62 Road to location -----Job In Progress---- '"""WSR Continued to 08-~ ~ 09-09'"'''' ; ~~~ ~8/8/2009~ASRC Test Unit #2, Stand by for~Acid Stim, '`'`'`Job in Progress**"~ ~~ j~~ ~ 8/9/2009 ***WSR Confinued from 08-09-09*** T/I/0=1900/760/40 Temp=Sl Acid ~~ ' Treatment -Tbg Pickle (Pre Acid Stim) Pumped 12 bbls 90*F 12% HCI acid ~ ~ followed with 3 bbls 60*F neat methanol and capped with 250 bbls 120*F crude ~ ~down Tbg, Final WHP's=900/760/40. Valve positions at departure:Swab, ~ ,Wing SSV= Shut. Master, IA & OA= Open. ~ _ _ __~_ ~__ _ ___. __~. _~ ~ 8/9/2009~ASRC Test Unit #2 Begin Acid flowback '"`*Job in Progress*** ~ ~ _ . m~ _ ~ __ . _ . _.._ _ ___ ~.____~___ _ ~ 8/10/2009~ASRC Test Unit #2, Continue Acid Stim Ops. "**Job in Progress*** ~ ~---__--_ ~- __ -~ - ~ ; 8/10/2009IT/I/0=950/200/0, Temp= SI. Load IA with crude (Pre Acid Stim) Loaded IA ; Iwith 5 bbls 60/40, 665 bbls crude. FWHP's=1350/480/0. SV, WV shut. MV, IA, ~ ~..__ OAOpen. __ _~___.___ . ._. '~~ 8/11/2009 T/I/0=1400/200/0 Acid Stimulation with SLB pump. Pumped down Tbg with: ~ 5 bbls neat meth 3 20 bbls 3%NH4C1 w/0.2% F103 Surfactant { 33 bbls 90:10 DAD acid 12% HCI a 33 bbls 9:1 MUD acid I 33 bbls 3% NH4CI overflush w/0.2% F103 surfactant 10 bbls 30 ppt HEC w/1 ppg wax beads ~33 bbls 90:10 DAD acid 12% HCI ~ ~33 bbls 9:1 MUD acid ~ 33 bbls 3% NH4CI overflush w/0.2% F103 surfactant i 11 bbls 30 ppt HEC w/1 ppg wax beads E ~30 bbls 90:10 DAD acid 12% HCI i ~30 bbls 9:1 MUD acid ! 59 bbls 3% NH4CI overflush w/0.2% F103 surfactant ~ `290 bbls 3% NH4CI overflush and displacement ~ 10 bbls fresh water 1 ~ __~__ ~FWHP's=920/513/0 _ ~__ a . . . _ .. ~. _ _._ _. _ _ __ ~ 8/11/2009€ASRC Test Unit #2, Continue Acid flowback ops. **"Job in Progress""* ~_ ` ~.___.~ ; 8/12/2009jASRC Test Unit #2, Continue Acid flowback, ***Job in progress'`*" 4 i t..._.__._.._.~._.__._...~_......_...,......_._...._.._____ ~..~_._'_"'__ .w ......._..__......._,,...___.~._ ......._~~___...~.m__m__ ._ ......._.._ ; 8/13/2009 ASRC Test Unit #2, Continue Acid flowback, pH-3, "'"*Job in progress*'"* ~ ..____ __ _~ ~. . _......___ .__._ _._.~_~ _. _______._.. ___~. _ ~ _ j 8/14/2009;ASRC Test Unit #2, Continue acid flowback, ***Job in progress'`** _ _ _~__ ; . ____ _ ___.__ ~ _ ,_-- -__ ____- - 8/15/20091ASRC Test Unit #2, Complete acid flowback, complete 8 hour test, Start R/D, I"*"Job in ro ress*** _~. _ __.._._____ _._ ~ __.P ~ ~ ~ __ ____ ._._.._. __ ___ ...__ ___~ W ~ ~ ~ 8/16/2009~ASRC Test Unit #2, Complete R/D, move unit, '"''*Job complete*"* FLUIDS PUMPED BBLS 5 NEAT METH 20 3% NH4C1 W/0.2% F103 SURFACANT 33 90:10 DAD ACID 12% HCI 33 9:1 MUD ACID 59 3% NH4C1 OVERFLUSH W/0.2% F103 SURFACANT 10 30 PPT HEC W/1 PPG WAX BEATS 33 90"10 DAD ACID 12% HCI 63 9:1 MUD ACID 33 3% NH4C1 OVERFLUSH W/0.2% F103 SURFACANT 11 30PPT HEC W/1 PPG WAX BEADS 30 90:10 DAD ACID 12% HCI 290 3% NH4C1 OVERFLUSH AND DISPLACEMENT 620 TOTAL ~.2 ~,. DATA SUBMITTAL COMPLIANCE REPORT 1 /29/2008 Permit to Drill 2050830 Well Name/No. PRUDHOE BAY UNIT W-07A Operator BP EXPLORATION (ALASKA) INC MD 20113 TVD 9050 Completion Date 11/11/2005 Completion Status 1-OIL Current Status 1-OIL REQUIRED INFORMATION Mud Log No Samples No Directional Survc~i~Yes DATA INFORMATION Types Electric or Other Logs Run: MWD DIR / GR / RES /AIM /DEN / NEU (data t aken from Logs Portio n of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Tye Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ~- D Asc Directional Survey 0 20113 Open 11/21/2005 Rpt Directional Survey / 0 20113 Open 11/21/2005 I ~ "~D C Lis 15291 Induction/Resistivity 12349 20107 Open 7/25/2007 LIS Veri, ROP, GR, FET, RH01 w/Graphics PDS ', and TIF ~ ~g 15291 Induction/Resistivity 25 Blu 12342 20059 Open 7/25/2007 MD Vision Service 6-Nov- / 2005 tl~4g 15291 Induction/Resistivity 25 Blu 12342 20059 Open 7/25/2007 TVD Vision Service 6-Nov- 2005 i Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION ? '~ Well Cored Y ilpV Daily History Receive d? LJ Chips Received? X1~1L- Formation Tops ~/ N Analysis ~1C.L,DJ- Received? Comments: Compliance Reviewed By: __ ____ ___.___ Date: -- . ~~ API No. 50-029-21918-01-00 UIC N 07/23/07 • $Chlplll~l~I'~I' Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth «~ ~~ ~ ~ °~~° i~ !~ ~.- r NO. 4339 ~~ ~ ~ ~ ~~~ j C.~ _ O~~ Company: State of Alaska Alaska Oil 8 Gas Cons Comm .,~~~ ~7i~ ~ L4~~w ~`;q~pOr, f,UlY11111 +8l(~Yt Attn: Christine Mahnken ~~ l 333 West 7th Ave, Suite 100 ;~i1i"~I(?I°c~C~4' Anchorage, AK 99501 Field: Prudhoe Bay r,..... el C.,1.,~ rtn -4 4 4 2 1 W-07A 40012483 11/06/05 1 S-401 (REVISED) 40014121 OH EDIT MWD/LWD 10121106 2 1 S-401 PB1 (REVISED) 40014121 OH EDIT MWD/LWD 10/08106 2 1 C-17B 10715418 MCNL 08/10/04 1 L5-15 11626485 RST 05/12/07 1 1 N-15 11637129 RST 01/13/07 1 1 15-38A 10715446 MCNL 12/11104 1 PLEASE AGKNUWLtUGt KtGt1Y 1 tiT SIliNIlVla ANU Kt I UKNIIVIa VIVt I.VYT tAt.l'1 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ECEIVECJ ,JAN 1 $ 2006 x~laska Oil & Gas Cons. Cotnmissiort AnrtsM~fll! 1a. WeII Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 20AAC 25.105 2oAAC 2s.~,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban jG 11/1 / /~ O 12. Permit to Drill Number 205-083 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 10/19/2005 13. API Number 50-029-21918-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 11/5/2005 14. Well Name and Number: PBU W-07A 1332 FNL, 1192 FEL, SEC. 21, T11N, R12E, UM Top of Productive Horizon: 3384' FNL, 572' FW L, SEC. 35, Ti 1 N, R12E, UM 8. KB Elevation (ft): 81.64' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Total Depth: 4740' FNL, 730' FWL, SEC. 35, T11N, R12E, UM 9. Plug Back Depth (MD+TVD) 20034 + 9043 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 612049 y- 5958925 Zone- ASP4 10. Total Depth (MD+TVD) 20113 + 9050 Ft 16. Property Designation: ADL 028264 TPI: x- 619309 y- 5946424 Zone- ASP4 Total Depth: x- 619490 Y- 5945071 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: ~- ----------~-- ------------ f Thi k f P t 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL ness o erma ros 20. c 1900' (Approx.) 21. Logs Run: MWD DIR / GR / RES /AIM /DEN / NEU 2. CASING, LINER AND EMENTING RECORD CASING ETTING ` EPTH MD ETTIN(i EPTH TVD ; I"fOLE AMOUNT SIZE ! WT. PER FT. GRADE OP - TTOM OP TTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 13-3/8" 68# L-80 Surface 3155' Surface 2695' 17-1/2" 500 cu ft Coldset II 9-5/8" 47# NT80S Surface 12349' Surface 7844' 12-1/4" 035 cu ft Class'G' 7" 26# L-80 12180' 13921' 7742' 8727' 8-1/2" 197 cu ft Class'G' 4-1/2" 12.6# 13Cr80 13744' 20112' 8630' 9050' 6-1/8" 1072 cu ft Class'G' 23. Perforations open to Produc tion (MD + TV D of Top and " " 24. TUBING RECORD Bottom Interval, Size and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 2-1/2" Gun Diameter, 4 spf 4-1/2", 12.6#, 13Cr80 13751' 13695' MD TVD MD TVD 18780' - 19650' 9008' - 9017 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MO AMOUNT He KIND OF MATERIAL USED Freeze Protect with 155 Bbls of Diesel 26• PRODUCTION TEST Date First Production: December 8, 2005 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date of Test 1/6/2006 Hours Tested 4 PRODUCTION FOR TEST PERIOD OIL-BBL 79 GAS-MCF 65 WATER-BBL 26 CHOKE SIZE 176° GAS-OIL RATIO 817 Flow Tubing Press. 25 Casing Pressure 700 CALCULATED 24-HOUR RATE OIL-BBL 476 GAS-MCF 389 WATER-BBL 156 OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core mss; if none, state 'none . None , o ~° I' ~,_~ ~ZJ 3 y ~ ...~~~~~ y ,~~~, E'~`. Form 10-407 Revised 12/2003 ~ w TI UED ON REVERSE SIDE ~~t-~,~~ ' k ' ..~.~~ ~8. GEOLOGIC MARKERS 29' rORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag river 13930' 8732' None Shublik A 13969' 8753' Shublik B 14053' 8804' Shublik C 14089' 8827 Shublik A 14113' 8843' Shublik B 14180' 8885' Shublik C 14219' 8907' Eileen 14245' 8921' Sadlerochit 14291' 8944' Sadlerochit 15416' 8923' Sadlerochit 15939' 8967' Sadlerochit 17241' 9013' Sadlerochit 17289 9014' Sadlerochit 18396' 9018' Sadlerochit 18485' 9016' Sadlerochit 18572' 9013' Sadlerochit 18745' 9008' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic biagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. 1 / ) Signed Terrie Hubble ~ Title Technical Assistant Date ~ ` / [ 7 /d PBU W-07A 205-083 Prepared ByName/Number.• Ter/ie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Dave Wesley, 564-5153 INSTRUCTIONS GeNeRar.: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Printed: 11/21!2005 11:48:24 AM • BP Exploration Page 1 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date I' From - To ' Hours Task Code ~ NPT _~_ 10/5/2005 16:00 - 19:00 3.00 ~ W HSUR P 19:00-19:30 0.50` WHSUR P 19:30 - 20:00 0.50 WHSUR P 20:00 - 22:30 2.50 WHSUR P 22:30 - 23:00 23:00 - 00:00 10/6/2005 00:00 - 02:30 02:30 - 07:30 0.50 WHSUR P 1.00 WHSUR P 2.50 BOPSU P 5.00 BOPSU P 07:30 - 09:30 09:30 - 10:00 10:00 - 14:00 14:00 - 15:00 15:00 - 16:30 16:30 - 17:30 17:30 - 19:00 19:00 - 19:30 2.00 PULL P 0.50 PULL P 4.00 PULL P 1.00 PULL P 1.50 BOPSU P 1.00 PULL P 1.50 PULL P 0.50 PULL P Spud Date: 2/16/1989 Start: 10/5/2005 End: 11/15/2005 I Rig Release: 11/15/2005 Rig Number: Phase ~ Description of Operations DECOMP Accept Rig to W-07a at 16:00 hrs. Take on seawater to pits. RU DSM and pull BPV with lubricator. RU circulating lines and pressure test same to 3500 psi. DECOMP Pre Spud HSE meeting with all personnel. Check pressures on well, IA 0 psi, OA 0 psi DECOMP Open up well and observe, static. Reverse circulate diesel out of tubing at 3 bpm 100 psi, pump 40 bbls. DECOMP Switch over and pump 50 bbl safe surf sweep down the tubing followed by 490 bbls heated 8.5 ppg heated sea water at 6 bpm 350 psi until sweep returned to surface and diesel cleaned up. Shut down pumping and monitor well, Static. RD circulating lines and blow down same. Suspect hole in tubing Cam? 3300' DECOMP Install TWC and test from below to 1000 psi, held. DECOMP ND tree and adaptor flange, inspect tubing hanger threads, hanger threads in good shape, screw XO into hanger and check MU 10 1/4 rounds. Install plugs in control line ports and function LDS. DECOMP NU BOP, Cut Riser to fit BOP stack DECOMP RU test equipment and test BOPE to BP & AOGCC Regs, 250 psi low / 3500 psi high. Test witness by Lance Vaughn (WSL), Lowell Anderson (WSL) Chris Clemens (WSL) Chris Weaver (Tourpusher), Jim Davidson (Toolpusher) AOGCC Rep John Spalding waived witness of test. RD Test equipment. No Failures DECOMP RU DSM and pull TWC with lubricator. RU Camco control line spooling unit. MU joint of DP to tubing hanger and screw into Top Drive. Back out lock down studs. DECOMP Pull working up to 150K including top drive, calculated string wt. 132K. String parted C~3 +/- 1,880'. DECOMP POH LD 3 1/2" tubing, spooling dual control line. Recover 59 jts. + 4.5'. Leaving 4 jts + 26' to SSSV. Recover 29 clamps and 2 SS bands. Total in well 31 clamps and 4 SS bands. DECOMP RD 3 1/2" handling equipment. RU 4" DP handling equipment. DECOMP RU test equipment and test lower BOP rams to BP & AOGCC Begs, 250 psi low / 3500 psi high. RD Test equipment and install Wear Bushing. DECOMP MU fishing BHA #1 consisting of: 8-1/8" OD cutlip guide, 8-1/8" OD x 3-1/2" overshot bowl, 8-1/8" OD overshot extension and bumper sub wlxovers back to 4" HT-40 drill pipe. DECOMP DECOMP 19:30 - 20:00 0.50 PULL P DECOMP 20:00 - 22:30 2.50 PULL P DECOMP 22:30 - 00:00 1.50 PULL P DECOMP 10/7/2005 00:00 - 01:00 1.00 FISH P DECOMP 01:00 - 01:30 0.50 FISH P DECOMP 01:30 - 03:00 I 1.501 FISH I P I I DECOMP RIH w/BHA # 1 and tag fish at 1911', engage fish down to 1916'. Up wt. 60K, SO 60K before engaging fish. PU to calculated fish/string/topdrive wt of 145K. Work pipe up and down in 5K increments to 160K. Fish did not pull free. Set slips w/160K. Call out Schlumberger wireline to run chemical cutter and recut tubing at 13673'. Rig service, lubricate rig and top drive. Moblize Schlumberger wireline. RU Schlumberger wireline to perform chemical cut. RU Schlumberger wireline to perform chemical cut. PJSM w/all hands, Schlumberger, Tourpusher, WSLs on chem-cutter handling and safety. RIH w/2-3/8" OD Schlumberger chem-cutter. Printed: 11/21/2005 11:48:31 AM • BP Exploration Page 2 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Date From - To 10/7/2005 03:00 - 04:00 04:00 - 06:00 06:00 - 06:30 06:30 - 07:00 07:00 - 08:00 08:00 - 08:30 08:30 - 10:00 10:00 - 11:30 11:30 - 13:00 13:00 - 13:30 Hours ~ Task Code'i NPT ~ Phase 1.00 FISH P 2.00 FISH P 0.50 FISH P 0.50 FISH P 1.00 FISH P 0.50 FISH P 1.50 FISH P 1.50 FISH P 1.50 FISH P 0.50 FISH P 13:30 - 14:00 0.50 FISH P 14:00 - 14:30 0.50 FISH P 14:30 - 15:00 I 0.501 FISH 1 P 15:00 - 16:30 1.50 FISH P 16:30 - 17:00 0.50 FISH P 17:00 - 17:30 0.50 FISH P 17:30 - 18:30 1.00 FISH P 18:30 - 19:30 1.00 FISH P 19:30 - 21:00 1.50 FISH P 21:00 - 22:00 I 1.001 FISH I P 22:00 - 22:30 0.50 FISH P 22:30 - 00:00 1.50 FISH P 10/8/2005 00:00 - 02:00 2.00 PULL P 02:00 - 02:30 0.50 PULL P 02:30 - 03:00 0.50 PULL P 03:00 - 03:30 0.50 PULL P 03:30 - 05:30 2.00 PULL P 05:30 - 06:00 0.50 FISH P Description of Operations DECOMP Log chem cutter on depth to 13,673' and fire. DECOMP POH w/cutter assembly &PJSM on laying down chemical cutter. DECOMP RD Schlumberger wireline and stack equipment away from floor in case needed for second cut. Clear floor. DECOMP Pull on fish working up to 190k including top drive weight, hook load dropped to 60k, attempt to engage fish with no success. Tubing string parted. POH DECOMP Break down overshot and release fish. Recovered 16.71' badly corroded 3-1/2" Tbg. DECOMP Redress overshot with new grappel w/full control. MU same to BHA. DECOMP RIH Tag TOF @ 1,938'. Engage grapple @ 1,943'. Pull, working string up to 100k including top drive, set slips with tubing string in 15k tension for chemical cut. DECOMP PJSM w/all hands, Schlumberger, Toolpusher, WSLs on chem-cutter handling and safety. RU Schlumberger. MU 2-3/8" chemical cutter run # 2. DECOMP RIH with chemical cutter on a-line. Cutter held up @ 1,932', unable to work into tubing stub. POH with cutter LD same and RD Schlumberger. DECOMP Puli on fish, working string up to 195k including top drive pumping at 6 bpm, 140 psi, string parted. DECOMP POH with fish DECOMP Break down overshot and release fish. Recovered 5.75' badly corroded 3-1/2" Tbg. & 1/2 of rubber control line clamp obstructing top of the fish. DECOMP Redress overshot with new grappel w/full control. MU same to BHA. DECOMP RIH with overshot and tag TOF @ 1938' DECOMP Engage grapple @ 1,943'. Pull working up to 115k including top drive, set slips with tubing string in 30k tension for chemical cut. LD 15' pup jt. DECOMP PJSM - RU Schlumberger wire line. DECOMP MU 2-3/8" chemical cutter #3 and RIH with same on a-line. Log cutter on depth in middle of full joint @ 5000' & fire cutter. Good indication cutter fired, line jumped and loss of weight on e-line. DECOMP POH with cutter #3 and LD same. RD Schlumberger. DECOMP Pull fish free 80k string weight including top drive. POH with fish. DECOMP Release overshot and LD cut joint. Recovered other half of rubber control line clamp out of overshot. DECOMP RU 3-1/2" handling equipment. DECOMP POH LD 3-1/2" Tbg. DECOMP Cont' LD 3-1/2" tbg. Recovered total 95 jts. 18.33' & 5.5' cut jts. SSSV, 1 GLM. 4 pup jts. DECOMP RD 3-1l2" handling equipment. Clean and clear rig floor. DECOMP Service rig and top drive. DECOMP MU fishing BHA #4 DECOMP RIH w/ BHA #4 to 4931' DECOMP Wash down pumping @ 275 gpm. 400 psi. to TOF @ 5000'. Up wt. 95k Down wt. 90k. Rotating wt. 95k. Printed: 11/21/2005 11:48:31 AM • BP Exploration Page 3 of 19 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ~ From - To 10/8/2005 06:00 - 06:30 06:30 - 09:30 09:30 - 11:00 11:00 - 11:30 11:30 - 12:30 W-07 W-07 Spud Date: 2/16/1989 REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 NABOBS 7ES Rig Number: i Hours ~ Task i Code NPT 0.50 FISH P 3.00 FISH P 1.50 FISH P 0.50 FISH P 1.00 FISH P 12:30 - 13:00 0.50 PULL P 13:00 - 23:00 10.00 PULL P 23:00 - 23:30 23:30 - 00:00 10/9/2005 00:00 - 02:30 0.50 PULL P 0.50 PULL P 2.50 PULL P 02:30 - 03:00 03:00 - 04:30 04:30 - 05:30 05:30 - 08:00 08:00 - 16:30 16:30 - 19:00 0.50 PULL P 1.50 PULL P 1.00 PULL P 2.50 PULL P 8.50 PULL P 2.50 PULL P 19:00 - 21:00 I 2.001 PULL I P 21:00 - 00:00 3.00 PULL P 10/10/2005 00:00 - 03:00 3.00 PULL P 03:00 -04:30 1.50 PULL P 05:00 - 06:00 1.00 PULL P 06:00 - 11:00 5.00 PULL P 11:00 - 12:00 1.00 PULL P 12:00 - 13:00 1.00 FISH P 13:00 - 15:00 2.00 PULL P 15:00 - 22:00 7.00 PULL P 22:00 - 00:00 2.00 PULL P Phase ~, Description of Operations DECOMP Engage fish. Pull, working string weight up to 200k. Start jarring operations jarring from 150k working up to 200k and pulling up to 225k including top drive. Jarred fish free, up weight 145k. DECOMP POH pumping out to clear fill from around tbg string w/190 gpm 120 psi to 10,688'. Flow check well, observe slight flow. DECOMP Circulate bottoms up. Pumped 650 bbls. ~ 450 gpm. 580 psi. Shut down monitor well, Static. DECOMP POH to fishing BHA. Well taking proper displacement. DECOMP Release overshot from fish and LD fishing BHA #4 and 13.5' cut jt. DECOMP RU 3-1/2" handling equipment. DECOMP POH laying down 3-1/2" tubing and jewlery. Lay down total of: 269 Jts., 7 GLM, 14 pup jts. , 13.15' & 13.5' cut jts. Found cement around tubing collars on lower portion of string. DECOMP RD 3-1/2" handling equipment. Clean and clear rig floor. DECOMP Change out top drive saver sub /safety valve to 4-1/2" IF. DECOMP Cont' change out top drive saver sub /safety valve to 4-1/2" IF. Test 5" Lower kelly cock, floor safety valve & IBOP to 250 / 3500 psi. Dress grabber for 5" DP. DECOMP Service rig and top drive. DECOMP PU fishing tools to the rig floor & MU BHA #5. 8-1/8" washpipe w/ saw-tooth burn shoe DECOMP RIH PU 9, 6-1/2" DC's. DECOMP RIH w/ BHA #5, on 4" DP from derrick. Filling pipe every 30 stands. DECOMP Change handling equipment to 5". RIH 1 x 1 picking up 5" drill pipe 262 jts. Tag fill @ 13576' DECOMP MU top drive and wash down with nutter wash pipe saw tooth burn shoe from 13,576' to the TIW tbg seal assembly C~ 13,680'. Inside mill tagged TOF (~ 13,652'. Milled stub down to 13,656'. UP WT-225k, DN WT-165k, RT WT-200k, TO-8-1 ik, RPM-90, Pump-1060 psi @ 390 gpm. DECOMP Circulate 2 x 40 bbl. High Vis sweeps back to back @ 570 gpm, 2020 psi. Rotate and reciprocate pipe. Large quanity of sand back to surface with sweeps. DECOMP Monitor well & POH for fishing BHA #6. DECOMP POH with washover /milling assy. # 5. DECOMP LD washpipe and milling equipment from BHA # 5. Clear rig floor. DECOMP MU/PU Fishing BHA # 6 consisting of cutlip guide, bowl grapple assy., extension, drive sub, 9 drill collars, bumper sub, jars, and accelerators. DECOMP R1H to 13,530' DECOMP Slip and cut 130' drilling line. DECOMP RIH from 13,530' to TOF G 13,656'. Up WT-225k, DN WT-170k, RT WT-200k, TQ-8k. Pump 840 psi. @ 400 gpm. Engage fish @ 13,661' and pulled free with no resistance. Work over fish seeing pump pressure increase when bottomed out in overshot. LD 2 singles of drill pipe. DECOMP Circulate bottoms up with 400 gpm @ 780 psi. Total of 735 bbls pumped. Shut down and monitor well, Static. DECOMP POH with BHA #6. Flow check well at BHA DECOMP LD BHA. No recovery, overshot guide showed sign of tubing Printed: 11/27/2005 11:48:31 AM • BP Exploration Operations Summary Report Page 4 of 19 Legal Well Name: W-07 Common Well Name: W-07 .Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code j NPT Phase 10/10/2005 22:00 - 00:00 2.00 PULL P DECOMP 10/11/2005 00:00 - 01:30 1.50 PULL P DECOMP 01:30 - 06:30 5.00 PULL P DECOMP 06:30 - 07:00 0.50 PULL P DECOMP 07:00 - 14:00 I 7.001 FISH I P I I DECOMP 14:00 - 21:00 7.00 PULL P DECOMP 21:00 - 22:30 1.50 PULL P DECOMP 22:30 - 00:00 1.501 PULL P DECOMP 10/12/2005 00:00 - 00:30 0.50 PULL P DECOMP 00:30 - 05:00 4.50 PULL P DECOMP 05:00 - 06:00 1.00 PULL P DECOMP 06:00 - 06:30 0.50 FISH P DECOMP 06:30 - 12:00 5.50 PULL P DECOMP 12:00 - 14:30 2.50 PULL P DECOMP 14:30 - 15:00 0.50 BOPSU P DECOMP 15:00 - 21:00 6.00 BOPSU P DECOMP 21:00 - 21:30 0.50 BOPSU P f DECOMP 21:30 - 22:30 1.00 PULL P i DECOMP Description of Operations stub possibly belled. Clean and clear rig floor of vendors tools. Change out handling equipment for 8.125" washpipe. PU / MU Milling BHA #7 - 8.50" OD X 7" ID Burn shoe (8.375" bushing / 2 jts 8.125" washpipe / W P boot basket /float sub / fishing jar / XO / 3 stands 6.5" DC's / XO / XO. RIH. Break circlulation and clear wash pipe ~ 8083' Obtain SPR's and establish milling parameters. UP WT-230k, DN WT-170k, RT WT-200k, TO-9k, RPM-100, Pump Rate- 450 gpm @ 1170 psi. Wash down from 13,600' over fish and start milling on TIW seal assembly ~ 13678' Mill overTlW seal assembly from 13,678' to 13,698'. UP WT-225k, DN WT-170k, RT WT-200k, TO-9 to 16k, RPM-90-100, Pump Rate- 450 gpm @ 1420 psi. Pumped 30 bbl. High vis sweep around. Sweep brought back good amount of metal and rubber Monitor well, static. POH to BHA POH with BHA #7, stand back 3 stands DC's. LD 8.50" burn shoe & bushing. Cleaned out boot basket, recovered 20 Ibs metal cuttings. Clean and clear rig floor. MU BHA #8 - 8.125" cutlip guide / 8.125" overshot bowl w/ 7" spiral grapple / 8.125" OS bushing / 2 jts. 8.125" Wash pipe / W P boot basket /float sub /bumper sub /fishing jar / XO / 3 stands 6.5" DC's / XO /accelarator / XO. Cont', RIH with BHA RIH to13,600'. Fill pipe (~ 5,000' & 9,900' Slip and cut 88' drilling line. Service rig & top drive. Obtain SPR's and establish parameters. UP WT-230k, DN WT-170k, RT WT-200k, TO-8k, Pump Rate- 450 gpm @ 1120 psi. Wash down from 13,600' over fish and engage TIW seal assembly ~ 13687', Observed a 200 psi pressure increase, shut down pumps and swallow fish down to 13,698'. PU and set grapple with 45k over string weight with light jarring action. Repeat X2. PU to 10k over string weight and rotate to the right 15 turns @ 8 RPM's watching TO increase up to 12k. String weight dropped to 200k, good indication that K-anchor released. Monitor well. Static. POH with fishing BHA #7. POH wl BHA #8 - LD Fish 1 8.125" cutup guide ! 8.125" overshot bowl w/ 7" spiral grapple / 8.125" OS bushing / 2 jts. 8.125" Wash pipe / W P boot basket /float sub /bumper sub / fishing jar / accelarator. Stand back 3 stands DC's. Clean boot basket. Recovered 3.5" Cut jt / X-Nipple / 5.90' pup / XO /TIW overshot seal assem. & K-anchor. Clean and clear rig floor of vendors tools. Pull wear bushing and RU test equipment and install test plug Test ROPE to BP & AOGCC Regs, 250 psi low / 3500 psi high. Test witness by Lance Vaughan (WSL), Chris Clemens (WSL), Chris Weaver (Tourpusher), Jim Davidson (Toolpusher). Choke HCR failed Initial test, serviced same and retested, Passed. Test both 5" & 4" equip. James Regg of AOGCC wavied witness of test. RD test equipment. Blow down lines. Install wearbushing. MU BHA #9. - 2.70" OD Bull nose mill /Series 300 PRT w! 4" Printed: 11/21/2005 11:48:31 AM • BP Exploration Page 5 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Date !From - To I Hours Task Code NPT Phase 10/12/2005 121:30 - 22:30 I 1.00 -f - PULL P I DECOMP 22:30 - 00:00 1.50 PULL P DECOMP 10/13/2005 00:00 - 04:00 4.00 PULL P DECOMP 04:00 - 07:30 3.50 FISH P DECOMP 07:30 - 09:00 1.50 ~ FISH ~ P ~ ~ DECOMP 09:00 - 12:30 ~ 3.50 ~ FISH N ~ RREP ~ DECOMP 12:30 - 20:00 ~ 7.501 FISH ~ P DECOMP 20:00 - 21:30 1.50 ~ FISH P ~ ~ DECOMP 21:30 - 00:00 2.50 FISH N RREP DECOMP 10/14/2005 00:00 - 02:30 2.50 FISH N RREP DECOMP 02:30 - 04:00 1.50 FISH P DECOMP 04:00 - 09:30 5.50 FISH P DECOMP 09:30 - 10:30 1.00 FISH P DECOMP 10:30 - 11:30 1.00 FISH P DECOMP 11:30 - 20:00 8.50 FISH P DECOMP 20:00 - 22:00 2.00 FISH P DECOMP 22:00 - 23:00 ~ 1.00 ~ FISH ~ P ~ DECOMP 23:00 - 00:00 ( 1.00 ~ FISH { P ~ ~ DECOMP Description of Operations OD Grapple / 3.125" PRT extension / 8.5" OD Packer Mill / XO / 3 x 7" Boot Baskets / XO /Float Sub /Bumper Sub /Fishing Jar / XO / 3 stds. 6.5" DC's / XO /Accelarator / XO. RIH with BHA. RIH wf BHA #9. Fill pipe every 30 stds. Obtain SPR's and establish parameters. UP WT-235k, DN WT-170k, RT WT-200k, TO-7-8k, Pump Rate- 400 gpm C~3 1730 psi. Wash down from 13,600'. Engage 9.625 packer C~ 13,698'. Pull 15k over up weight to confirm latch. Mill /push packer from 13,698' to 13,708' with 450 GPM Ca? 1800 psi., 70-rpm, TO-12-18k. Pumped 35 bbl. High Vis sweeps while milling. Pump 35 bbl High Vis sweep around with 510 gpm @ 3175 psi. surface to surface. Trouble shoot and repair top drive backup wrench for trip out of hole. Circulate ~ 360 gpm @ 1360 psi while working on top drive. POH w/ BHA #9. with intermittent over pulls of 10-15k over up weight leaving bottom. POH stand back 3 stands DC's LD Accelarator /fishing jars / bumper sub / 3 boot baskets /PRT/. (Note:2.51' Bull nose mill and 4" grapple left in hole with fish). Clean and clear rig floor of vendors tools. Recovered 25 Ibs metal cuttings from boot baskets. Replaced top drive (Lower) backup wrench assembly. Replaced top drive (Lower) backup wrench assembly. MU BHA #10 4.01" Spear/ XO/ Float sub / XO / 3 x 7" Boot Baskets / XO / Bumper Sub /Fishing Jar / XO / 3 stds. 6.5" DC's / XO /Accelarator / XO. RIH To 13,617', Fill drill pipe every 35 stands. Establish parameters, UP WT-235k, DN WT-170k. Slack off to 13,704' w/ pumps 180 gpm @ 420 psi, pressure increase to 450 psi, Kick out pump. Con't slack off to 13,706'. Stack out 20k. PU 30' with no wt. increase. Slack off to 13,706', stack out 30k. Pick up 10', wt increased 10k. Slack off to 13,718', stack out 10k. Pick up to 13,660', with no overpull. Slack off to 13,679', stack out 10k. All indications that fish engaged with 30k set down. After picking up 10k over string wt, allowed the element / btm slips to relax. String took wt at suspected casing collars at 13,718'. Picked up above the next collar and then slacked off, string took wt at suspected casing collar at 13,679' this confirmed that fish is on spear. POH to 13,625' Cut & Slip 91' drilling line /Service rig and top drive. POH w/fish. Handle BHA. Stand back 3 stands DC's. LD Accelarator / Spear and 3 Boot Baskets and clean same. No Fish. Recovered 25 Ibs metal cuttings from boot baskets. Clean & Clear rig floor of vendors tools. PU Fishing tools to rig floor, strap / OD - ID same. PJSM on making up BHA MU BHA #11- 3"x4.89" Taper Tap /String Magnet / XO /String Magnet /Float Sub / XO / 3x Boot Baskets / XO /Bumper Sub / Fishing Jar / XO / 3 Stands DC's / XO /Accelarator /Pump Out Printed: 11/21/2005 11:48:31 AM • BP Exploration Operations Summary Report Page 6 of 19 Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABORS 7ES Rig Number: Date From - To I Hours ' Task 10/14/2005 23:00 - 00:00 1.00 FISH 10/15/2005 00:00 - 01:00 1.00 FISH Code' NPT Phase ! Description of Operations P P 01:00 - 06:00 5.00 FISH P 06:00 - 07:00 1.00 FISH P 07:00 - 09:00 09:00 - 17:00 17:00 - 19:30 19:30 - 20:30 20:30 - 21:00 21:00 - 22:30 22:30 - 00:00 2.001 FISH P 8.00 FISH P 2.50 FISH P 1.00 FISH P 0.50 FISH P 1.50 DHB X 1.50 DHB C 10/16/2005 100:00 - 09:30 9.501 DHB I C 09:30 - 10:00 0.50 DHB C 09:30 - 16:00 6.50 DHB C 16:00 - 17:30 1.50 DHB C 17:30 - 23:00 5.50 DHB C 23:00 - 23:30 0.50 DHB C 23:30 - 00:00 0.50 BOPSU C 10/17/2005 100:00 - 00:30 00:30 - 03:00 03:00 - 03:30 0.50 BOPSU C 2.50 STWHIP C 0.50 STWHIP C DECOMP Sub / XO DECOMP MU BHA #11 - 3"x4.89" Taper Tap / 4.75° String Magnet / XO / 6.5" String Magnet /Float Sub / XO / 3x 7" Boot Baskets /Bit Sub /Bumper Sub /Fishing Jar / XO / 3 Stands 6.5" DC's / XO / Accelarator /Pump out Sub / XO. DECOMP RIH & tag TOF @ 13,680' DECOMP Establish parameters, UP WT-235k, DN WT-170k, RT WT-205k, TO- 7-8k, Break circulation 500 gpm C~3 1500 psi and pump 50 bbl High Vis sweep working taper tap into the top of the packer as sweep turned the corner to clean debris out of TOF. DECOMP Engage packer, set down 20k while rotating @ 25 rpm's, chase / push packer down to 13,724', shut down rotarty, PU string 10k over up wt. light jar action. PU string to 45k over up wt. fish released. Set down 50k and rotate into fish. Pulled up 15k over moving packer up the hole showing 10-15k overpulls to 13,639' indicating fish was engaged. DECOMP POH w/ fish. DECOMP POH w/ BHA. No fish. LD Accelarator /Fishing Jar /Bumper Sub /String Magnets /Boot Baskets. DECOMP Clean out boot baskets and magnets, Recovered 65 Ibs metal from same. Clean and clear rig floor of vendors tools. DECOMP Service Rig & Top Drive DPRB DECOMP Mobilize Schlumberger Wire Line Services. DECOMP PJSM with SWS & RU wire line unit for gauge ring junk basket run #1. DECOMP Run #1- MU &RIH w/ 8.5" gauge ring /junk basket. Held up at 9,638' POH. Recovered 5 Ibs mixtrue of Rubber /metal & mostly asphaltine. Run #2- MU & RIH w/ 8.375" gauge ring to 12,500'. POH w/ same. Recovered 1/2 gal asphaltine. Run #3- MU & RIH w/ 8.5" gauge ring /junk basket. Held up at 9,640' POH w/ same. Recovered 1/2 gal asphaltine. DECOMP PJSM w/ Halliburton Rep, WSL, SWS on handling and MU EZSV. DECOMP Run #4- MU &RIH w/ 9.625" EZSV Bridge Plug and set Q 12,394' ELM, 5' above casing collar. POH w/ a-line. RD Schlumberger. DECOMP MU BHA #12- 8.5" Starting Mill /Bit Sub 18.5" Upper Mill / 1 Jt 5" HW DP /Float Sub /Bumper Sub /Fishing Jar / XO / 3 Stands 6.5" DC's / XO / XO. DECOMP RIH to 12,325' DECOMP Wash last stand of drill pipe down f/ 13,325' pumping at 175 gpm Q 210 psi. Tag EZSV @ 12,372' SLM. Set down 20k to confirm. DECOMP RU to test 9.625" casing & Test same to 3500 psi, 185 stks, 7.8 bbls & hold for 30 min. DECOMP Test 9.625" casing to 3500 psi for 30 min. 0 psi loss. RD & blow down test equipment. DECOMP PJSM & Displace well, pumped 45 bbl High Vis Spacer followed by 1160 bbls. 11.4 ppg LSND milling fluid @ 500 gpm, 1850 psi, reciprocate pipe during displacement. DECOMP Change out shaker screens to 175 mesh, mix & pump dry job. Printed: 11/21/2005 11:48:31 AM • BP Exploration Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 7ES Date ~ From - To ~I Hours Task Code NPT 10/17/2005 03:30 - 08:00 4.50 STWHIP C 08:00 - 09:00 1.00 STWHIP C 09:00 - 09:30 0.50 STW H I P 09:30-13:00 3.50 STWHIP C 13:00 - 21:00 I 8.001 STWHIPIC 21:00 - 22:00 I 1.001 STWHIPIC Start: 10/5/2005 Rig Release: 11/15/2005 Rig Number: Page 7 of 19 Spud Date: 2/16/1989 End: 11 /15/2005 Phase '~ Description of Operations DECOMP POH for 9.625" whipstock. DECOMP Handle BHA -Stand back DC's / LD Fishing Jars and inspect mills. DECOMP PJSM on picking up 9.625" whipstock. WEXIT BHA / PU- 9.625" whipstock & MU to Mills / 1 jt. HWDP /Float Sub /MWD / UBHO Sub /Bumper Sub & orient same. RIH w/ 3 stands DC's from derrick. WEXIT RIH w/ whipstock on drill pipe @ 1.5-2 min. a stand slips to slips. Surface test MWD @ 485'. WEXIT Break Circulation, Establish parameters and SPR's, orient whipstock 13 deg left of high side. UP WT- 195k, DN WT-140, 500 gpm @ 2790 psi. Set down 18k, bottom trip anchor set. PU 195k, mills free from whipstock, set down 65k verify anchor set. TOW @ 12,349' 22:00 - 00:00 2.00 STWHIP C WEXIT iii 9.6~window from 12,349' to 12,350'. w/ 500 gpm @ 2620 psi. 90 rpm. RT WT 175k, TO off 7k / TO on 9-12k 10/18/2005 00:00 - 06:30 6.50 STWHIP C WEXIT Mill window in 9.625" casing from 12,350' to BOW @ 12,366' and open hole to 12378'. Pump 500 gpm @ 2,730 psi, 90 rpm, TO on 9-11 k, Up 195k, DN 150K, RT 170K. Pump super sweep around and working mills through window. Top of window aat 12,349', Bottom of window at 12,366'. 06:30 - 08:00 1.50 STWHIP C WEXIT Perform FIT to 12.81 EMW w/ 11.4 ppg mud wt @ 12,349' MD, 7,862' TVD. Surface press 575 psi. Blow down lines. 08:00 - 16:00 8.00 STWHIP C WEXIT Monitor well. Slug DP. POOH to BHA - Layed Down 36 jts 4"DP. 16:00 - 17:00 1.00 STWHIP C WEXIT LD window milling BHA. Starting mill and string mill full gage. 17:00 - 17:30 0.50 STWHIP C WEXIT Clean and clear rig floor. 17:30 - 19:00 1.50 STWHIP C WEXIT Pull wear ring. Flush stack. Function all rams. Install wear ring. blow down lines. 19:00 - 21:00 2.00 STWHIP C WEXIT Make up 8 1/2" Directional drilling BHA - PDC bit / 1.15 deg motor -Orient tools. 21:00 - 23:00 2.00 STWHIP C WEXIT RIH w/ 40 stds 4" DP to 4,037'. Shallow test tools at 1,167'. 23:00 - 00:00 1.00 STWHIP C WEXIT RIH picking up 32 jts 5" DP. 10/19/2005 00:00 - 02:30 2.50 STWHIP G WEXIT RIH picking up total 120 jts 5" DP to 7,607'. 02:30 - 04:00 1.50 STWHIP C WEXIT RIH to 10,825'. 04:00 - 05:00 1.00 STWHIP C WEXIT Slip and cut drilling line. Service Top Drive. 05:00 - 05:30 0.50 STWHIP C WEXIT RIH with drilling BHA to 9 5/8" window at 12,349' 05:30 - 06:00 0.50 STWHIP C WEXIT Orient tools at top of 9 5/8" window. Establish ECD base line. SPR's. Slide thru window to 12,371'. Wash and ream to btm @ 12,378'. 06:00 - 16:15 10.25 DRILL C INT1 Dir drill from 12,378' - 12,651'. AST = 4.3 hrs, ART = 0 hrs, PU 210K, DN 145K. Stopped drilling to change bottom hole location for 8 1/2" hole TD 16:15 - 17:00 0.75 DRILL X DPRB INT1 Monitor well. Pulled bit up into 9 518" csg To 12,267'. No problems. 17:00 - 18:00 1.00 DRILL X DPRB INT1 Directional meeting reguarding 8 1/2" section TD target with Anchorage team. 18:00 - 18:30 0.50 DRILL X DPRB INT1 Meeting between Rig crew and Nabors Alaska Drilling management. 18:30 - 19:00 0.50 DRILL X DPRB INT1 Orient motor. RIH to 12,651'. No problems. 19:00 - 00:00 5.00 DRILL C INT1 Dir drill 8 1/2" from 12,651' to 12,914'. AST= 5.03 hrs, ART= 1.95 hrs, UP 215K, DN 150K, RT 170K, TO on 9-10k, TO off 9K, 510 gpm 3,250 psi, RPM 100. Cal. ECD 12.0 ppg, Actual Printed: 11/21/2005 11:48:31 AM • BP Exploration Operations Summary Report Page 8 of 19 Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Date From - To ~' Hours Task Code ' NPT Phase Description of Operations 10/19/2005 19:00 - 00:00 5.00 DRILL C INT1 ECD = 12.55 ppg. 10/20/2005 00:00 - 18:00 18.00 DRILL C INTi Dir drill 8 1/2" from 12,914' to 13, 890'. AST= 3.83 hrs ART= 7.72 hrs. UP 240K, DN 150K, RT 180K TQ on 16-17K, TQ off 15k, RPM 110, 500 gpm @ 2,990 psi off btm, 3,170 psi on btm. Calc ECD = 11.68 ppg, Act ECD = 12.43 ppg. 18:00 - 19:00 1.00 DRILL C INT1 Circ btms up for samples to pick 7" csg point. 19:00 - 19:15 0.25 DRILL C INT1 Drill 10' from 13,890' to 13,900'. 19:15 - 20:15 1.00 DRILL C INT1 Circ btms up for samples to pick 7" csg point. 20:15 - 20:30 0.25 DRILL C INT1 Drill 10' from 13,900' to 13,910'. 20:30 - 22:00 1.50 DRILL C INT1 Circ btms up for samples to pick 7" csg point. Circ sweep around. 22:00 - 22:15 0.25 DRILL C INT1 Drill 5' from 13,910' to 13,915'. 22:15 - 23:15 1.00 DRILL C INTi Circ btms up for samples to pick 7" csg point. 23:15 - 23:30 0.25 DRILL C INT1 Drill 6' from 13,915' to 13,921'. 23:30 - 00:00 0.50 DRILL C INT1 Circ btms up for samples to pick 7" csg point. 10/21/2005 00:00 - 00:30 0.50 DRILL C INT1 Circulate for samples - 13,921' TD for 7" csg. 00:30 - 02:00 1.50 DRILL C INT1 Monitor well. Static. Wiper trip -POOH w/ 18 stands to 12,300'. 20k - 30K drag from 13,700' to 13,600'. 02:00 - 02:30 0.50 DRILL C INT1 Service top drive. Clean rig floor. 02:30 - 03:00 0.50 DRILL C INT1 RIH to 13,880'. No problems. 20k - 40K intermitant drag. 03:00 - 06:00 3.00 DRILL C INT1 Fill pipe. Stage pumps up to 500 gpm 3,100 psi. Wash to btm 13,921'. No fill. Rotate 110 RPM. Cal ECD 11.86 ppg, ECD = 12.5 ppg. Circ and cond mud and hole for 7" liner. Pump 30 bbls hi vis sweep around. Circ hole clean. Final ECD 12.18 PP9• 06:00 - 11:30 5.50 DRILL C INT1 Monitor well. Pulled 5 stds. Slug DP. POOH to window 12,349'. No problems. Monitor well. POOH with 5" DP. Drop drift at 9 5/8" window. 11:30 - 16:00 4.50 DRILL C INT1 Change handling tools. POOH laying down 120 jts 4" DP. 16:00 - 18:00 2.00 DRILL C INTi Lay down. BHA. Down load LWD's. Clean and clear rig floor. 18:00 - 19:00 1.00 CASE C LNR1 Rig up to run 7" liner. PJSM. 19:00 - 21:45 2.75 CASE C LNR1 Pick up and run 41 jts 7" 26# L80 BTC-M liner. 21:45 - 22:30 0.75 CASE C LNR1 Make up 9 5/8" x 7" Baker HMC hanger and ZXP liner top packer. Rig down 7" casing running equipment and change handling tools. Total liner 1,741.08'. 22:30 - 23:00 0.50 CASE C LNR1 Circirculate liner volume and clear liner - 303 gpm Ca? 275 psi. Liner wt 68,000 lbs. 23:00 - 00:00 1.00 CASE C LNR1 RIH with 7" liner on 5" DP to 2,665'. Fill every 10 stands. UP 80K, DN 78k. 10/22/2005 00:00 - 06:30 6.50 CASE C LNR1 RIH with 7" liner on 5" DP to 12,315 '. FIII pipe every 10 stds. Rabbit last 40 stands of 5" drill pipe. 06:30 - 08:00 1.50 CASE C LNR1 Circulate one pipe volume. Bring pumps up to 8 BPM. UP 250K, DN 145K. 08:00 - 10:00 2.00 CASE C LNR1 RIH with 7" liner in open hole on 5" DP to 13,900'. No problems. 10:00 - 10:30 0.50 CASE C LNR1 Make up top drive cementing head, manifold, and lines. Tag bottom Q 13,921'. 10:30 - 11:00 0.50 CEMT C LNR1 Break circulation and stage pumps up to 1,100 psi. 11:00 - 11:30 0.50 CEMT C LNR1 Circulate and conditon mud and hole for cement. PJSM. Pressure test lines to 4,000 psi. 11:30 - 13:00 1.50 CEMT C LNR1 Schlumberger cemented pumping 30 bbls mud push 2 spacer, 35 bbs(128 sx) Class "G" with additives @ 15.8 ppg, dropped plug and displaced 269 bbls 11.4 ppg mud - 8 bpm with rig Printed: 11/21/2005 11:48:31 AM • BP Exploration Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Event Name: REENTE Contractor Name: NABOBS Rig Name: NABOBS Date From - To Hours 10/22/2005 .11:30 - 13:00 1.50 R+COMPLETE Start: 10/5/2005 ALASKA DRILLING I Rig Release: 11/15/2005 7ES Rig Number: Task Code NPT ' Phase De - I - ! __ CEMT ~ ~ LNRi pumps. Bumped plug to 1 13:00 - 14:15 I 1.251 CEMT I C I I LNRi 14:15 - 15:00 0.75 CEMT ~C LNR1 15:00 - 21:30 6.50 CEMT C LNR1 21:30 - 22:30 1.00 BOPSU P PROD1 22:30 - 00:00 1.501 BOPSUR P PRODi 10/23/2005 ~ 00:00 - 03:00 3.00 ~ BOPSUf~ P ~ PROD1 03:00 - 04:00 1.00 BOPSUF~ P PROD1 04:00 - 05:00 1.00 BOPSUR P PROD1 05:00 - 07:30 ~ 2.501 DRILL P ~ PROD1 07:30 - 15:45 I 8.251 DRILL I P I I PROD1 15:45 - 20:00 4.25 DRILL P PROD1 20:00 - 22:30 2.50 DRILL P PROD1 22:30 - 00:00 I 1.501 DRILL I P I I PROD1 10/24/2005 ~ 00:00 - 01:30 ~ 1.50 ~ DRILL ~ P ~ ~ PROD1 01:30 - 02:30 1.00 DRILL P PROD1 02:30 - 03:30 1.00 DRILL P PROD1 03:30 - 05:00 1.50 DRILL P PROD1 05:00 - 00:00 19.001 DRILL P PROD1 10/25/2005 ~ 00:00 - 07:00 ~ 7.00 ~ DRILL ~ P ~ ~ PROD1 07:00 - 08:00 I 1.001 DRILL I P I I PROD1 Page 9 of 19 Spud Date: 2/16/1989 End: 11 /15/2005 scription of Operations ,600 psi @ 12:37 hrs. Full returns throughout job. Presured to 3,500 psi and set hanger. Bled off pressure. Floats held. Released running tool. Pressure to 1,000 psi and pulled out of liner -circ 25 bbls @ 10 BPM. Set liner top packer w170K down. Circ bottoms up @ 334 gpm 1,200 psi. Recovered trace cement contaiminated mud. Lay down cementing head and two singles DP. Slug DP. POOH with liner running tool. Lay down same. Clean rig floor. Rig up to test BOP's. Pull wear ring, set test plug, fill stack with water. Test BOPE as per BP policy to 250 psi low and 3,500 psi high with 5" & 4" test joint. Test witness waived by Lou Grimaldi with AOGCC. Test withnessed by Mike Whiteley -Fairweather, Ray Barnes -Nabors. Finish testing BOP's with 5" & 4" test joints as per BP policy to 250 psi low and 3,500 psi high. Test witness waived by Lou Grimaldi with AOGCC. Witnessed by Mike Whiteley - Fairweather, Ray Barnes -Nabors. Rig down test equipment. Set wear ring. Blow down. Test 9 5/8" csg / 7" liner to 3,500 psi for 30 min. Lost 25 psi. Blow down kill line. Make up 6 1/8" drilling BHA - 1.5 degree motor, PDC bit, MWD, and LWD's. Orient tools, load source, upload LWD's. Surface test MWD. RIH with 6 1/8" BHA picking up 4" HT40 DP to 6,457' (189 jts). RIH with 5" DP out of derrick to 13,742'. Break circ. Drill cement stringers from 13, 770' to landing collar @ 13,835'. Drilled out landing collar @ 13,835', soft cement, float collar @ 13, 877', good cement to top of float shoe @ 13,920'. UP 260K, DN 120K, TO 20K, RPM 45. Pump 290 gpm @ 2700 psi. PJSM. Displace hole with 8.4 ppg Flo Pro mud. Pumped 100 bbls water, 50 bbls hi vis space, 820 bbl 8.4 ppg Flo Pro mud. 300 gpm @ 2,600 psi. Displace hole with 8.4 ppg Flo Pro mud. Up 215k, DN 160K, RT 185K, TO off 7.5K, 300 gpm @ 1,470 psi SPR's. Drill 20' new hole to 13,941'. Pull up into 7" casing. Circulate and condition mud for FIT. Performed FIT to 10.4 ppg EMW with 8.4+ ppg mud - 8,729' TVD, 880 psi surface pressure. Run base line ECD's. Dir Drill from 13,941' to 14,225'. Fault #1 @ 14,116' MD. ART = 3.8 hrs, AST= 10.22 hrs, UP 235K, DN 180K, RT 190K, 80 RPM, TO on 10.5 K, TO off 8K, 291 gpm @ 1,625 psi. Calc ECD = 8.8 ppg, ECD = 9.0 ppg Dir. Drill from 14,225' to 14,290'. PU wt. 230K, SO wt 160K, Rot wt. 180K. WOB 15K. 300 gpm, 1450 psi off, 1650 psi on. Motor not yielding enough dogleg in Shublick -behind in inclination. Target TVD lowered to 9,031'. No signal from AIM. Decision made to POH and PU BHA #16 w/1.69 deg Short-Pak motor assy. POH to shoe @ 13921' and open circ sub. Printed: 11/21/2005 11:48:31 AM BP Exploration Page 10 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 1 1 11 5/2005 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task~Code' NPT 10125/2005 08:00 - 17:30 9.50 DRILL P 17:30 - 19:00 1.50 DRILL P 19:00 - 19:30 0.50 DRILL P 19:30 - 20:15 0.75 DRILL N SFAL 20:15 - 22:30 22:30 - 00:00 2.251 DRILL I P 1.501 DRILL I P 10/26/2005 00:00 - 04:00 4.00 DRILL P 04:00 - 08:30 4.50 DRILL P 08:30 - 09:00 0.50 DRILL P 09:00 - 09:30 0.50 DRILL P 09:30 - 10:00 0.50 DRILL P 10:00 - 00:00 14.00 DRILL P Phase Description of Operations PROD1 POH to BHA laying down 4" drill pipe jt. # 1 to jt. # 193. PROD1 PJSM to handle nukes. LD BHA. LD motor assy. PROD1 Down load MWD data. PROD1 AIM tool lithium battery leak of gas in pipeshed when attempt is made to turn battery to off position w/shutoff bolt. Strong sulphurous odor noted throughout pipeshed, floor, doghouse. Secure well and evacuate rig to pipeshed as safety precaution. Vent pipeshed, floor and doghouse. PROD1 PJSM to handle nukes. PU BHA # 16, w/1.69 deg Short-Pak motor assy. PROD1 RIH f/239'. PU 4" HT-40 drill pipe fft # i to jt. # 30 and surface test MWD C 1194'. PROD1 PU 4" drill pipe. PROD1 RIH to 13800' PROD1 Slip and cut 120' of drilling line. PROD1 Spot metal to metal tube sweep in 7" casing before entering OH, discard at surface on return. Tq. 10K ft. lbs. PROD1 RIH to 14294'. PROD1 Directionally drill from 14294' to 14690'. Consulted w/town geo regarding landing point at 14556' MD/8995' TVD. Landing point = 14608' MD, 8996' TVD. Continue drilling per plan. Up wt. 240K, SO wt. 160K, Rot. wt. 190K. WOB 10K to 20K. 301 gpm @ 1800 psi. Tq. on 10.5-12, tq. off 10. Rpm 40. ECDs 9.01 calculated vs. 9.22 actual. ECD average variance calculated vs actual = .2 for 24 hrs/396' drilling. AST = 5.33, ART = 3.18, ADT = 8.51. 10/27/2005 00:00 - 06:00 6.00 DRILL P PROD1 Directionally drill f/14690' to 15023'. Up wt. 240K, SO wt. 150K, Rot. wt. 190K. WOB 10K to 25K. 301 gpm @ 1640 psi. Tq. on 13-14, tq. off 11. Rpm 80. ECDs 9.22 calculated vs. 9.25 actual. 06:00 - 10:00 4.00 DRILL N DPRB PROD1 Lost circulation C«2 15026'. Slow pump rate to 84 gpm @ 430 psi. 45 rpm. Calculated losses = 75 bph. Build and pump 10 ppb SafeCarb 40 pill. 10:00 - 10:30 0.50 DRILL N DPRB PROD1 POH to 7" shoe @ 13291'. 10:30 - 12:00 1.50 DRILL N DPRB PROD1 Circulate over top of hole due to lost circulation while taking on 8.4 ppg Flo-Pro mud. Take on mud. 12:00 - 15:30 3.50 DRILL N DPRB PROD1 Pump second pill, consisting of 20 ppb Safe-Garb 250 and 40, 15 ppb Safe-Garb 500, 10 ppb MI Seal medium, & 10ppb MIX II medium @ 84 gpm, 350 to 800 psi. 15:30 - 17:00 1.50 DRILL N DPRB PROD1 Shut down pumps and monitor well. Loss rates = 26 bph static, 33 bph @ 300 gpm/1630 psi. 17:00 - 18:00 1.00 DRILL N DPRB PROD1 RIH to bottom ~ 15026'. Found no fill. 18:00 - 20:30 2.50 DRILL P DPRB PROD1 Directional drill from 15026' to 15165'. Up wt. 240K, SO wt. 155K, Rot wt. 187K, 300 gpm, 1630 psi, 80 rpm, 14K tq. Losses continue Q 98 bph. 20:30 - 22:00 1.50 DRILL N DPRB PROD1 Pump third pill, consisting of 20 ppb MIX II M & C, 5 ppb Nut Plug F & G-Seal. Pump 172 gpm @ 925 psi to avoid activation of the MWD tools. 22:00 - 23:00 1.00 DRILL P DPRB PROD1 Directionally drill 15165' to 15260'. Up wt. 240K, SO wt. 155K, Rot. wt. 187K. WOB 5K to 15K. 300 gpm @ 1775 psi. Tq. on 14-15, tq. off 10. Rpm 80. ECDs 9.19 calculated vs. 9.25 actual. 102 bbl/hr mud losses. Printed: 11/21/2005 11:48:31 AM L BP Exploration Page 11 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: DateFrom - To Hours Task ~ Code ! NPT Phase Description of Operations _~ __ ~_ 10/27/2005 23:00 - 00:00 1.00 DRILL N DPRB PROD1 Circulate 160 gpm @ 910 psi. Losses continue. 10/28/2005 00:00 - 04:00 4.00 DRILL P PRODi MADPass (/15260' bit depth to 14675' bit depth @ 300'/hr., 250 gpm, rot. 80 rpm. 04:00 - 05:00 1.00 LCR N DPRB PROD1 RIH 05:00 - 08:00 3.00 LCR N DPRB PRODi Drop bar and activate circ. sub. C~3 2370 psi. Pump LCM pill consisting of 20 ppb MI-Seal (F), 20 ppb MI-Seal (M), 30 ppb MIX II, 20 ppb MI-Seal (C), 10 ppb nut plug. Pump pill ~ 113 gpm, start Q 600 psi climbing to packoff and shutdown C~3 4200 psi. 08:00 - 09:00 1.00 LCR N DPRB PROD1 Drill pipe plugged. POH to 7" shoe @ 1392i'. 09:00 - 09:30 0.50 LCR N DPRB PROD1 Monitor well while cleaning discharge screens and made unsuccessful attempt to clear drill pipe. 09:30 - 13:30 4.00 LCR N DPRB PROD1 POH w/5" drill pipe. 13:30 - 14:00 0.50 LCR N DPRB PROD1 RD 5" handling equipment, RU 4" handling equipment. 14:00 - 21:00 7.00 LCR N DPRB PROD1 POH clearing LCM from 4" drill pipe. 66 jts. plugged completely. 86 total jts w/LCM 2666' or 26 bbls of total 50 bbl. pill left in drill pipe. 21:00 - 21:15 0.25 LCR N DPRB PROD1 PJSM on nuke safety w/Schlumberger and all hands. 21:15 - 22:30 1.25 LCR N DPRB PROD1 Stand back jars. LD Flex collars. Remove nuke sources. LD BHA #16. 22:30 - 00:00 1.50 LCR N DPRB PROD1 Drain stack, function test upper, lower, blind rams. Load pipeshed w/4" drill pipe. 10/29/2005 . 00:00 - 00:30 0.50 LCR N DPRB PROD1 Service rig and top drive. 00:30 - 02:00 1.50 LCR N DPRB PROD1 Build mud, load pipe shed w/4" drill pipe, strap pipe. 02:00 - 10:30 8.50 LCR N DPRB PROD1 10:30 - 12:00 1.50 LCR N DPRB PROD1 12:00 - 14:30 2.50 LCR N DPRB PROD1 14:30 - 15:00 0.50 LCR N DPRB PROD1 15:00 - 15:30 0.50 LCR N DPRB PROD1 15:30 - 16:00 0.50 LCR N DPRB PROD1 16:00 - 17:00 1.00 LCR N DPRB PROD1 17:00 - 17:45 0.75 LCR N DPRB PROD1 17:45 - 19:00 1.25 LCR N DPRB PROD1 19:00 - 22:30 ~ 3.50 ~ LCR ~ N DPRB ~ PROD1 Note: Baker completed mill at 24:00. Mill arrived location @ 01:30 Delivery vehicle caught behind rig .move. MU mill. RIH w1BHA # 17 picking up 102 jts. 4" drill pipe to spot gunk sgeeze across lost circulatiorrzone C~ 15026'. Stuck pipe @ 14185'. Work stuck pipe free. Ream 1 stand. RIH washing and reaming as required and tag bottom C~3 15260'. Losses 120 bph. POH to 14975'. PJSM on pumping of diesel/gel "Gunk" squeeze w/Schlumberger, all hands, and WSL. Pressure test all lines to 3000 psi. Pump 150 bbls. H2O, 4 bpm Q 540 psi w/rig pumps. Swap over to Schlumberger pumps and pumped 10 bbls. mineral oil, 54 bbls of mineral oil/gel "Gunk", and followed w/10 bbls. mineral oil 4 bpm @ 400 psi. Swap over to rig pump for displacement, pump 170 bbls 8.4 ppg Flo-Pro mud @ 4 bpm @ 410 psi. Close annular preventer and squeeze "Gunk" away. Attempted 4 bpm but annular pressure too high. Dropped rate to 1 bpm w/annular pressure @ 500 -800 psi. Slowed pumps as annular pressure increased to .3 bpm. Shut pumps down when annular pressure reached 800 psi & DP pressure 2600 psi. Total 28.8 bbls of 54 bbls total "Gunk" squeezed into formation. Bleed off pressure Open annular preventer and circulate to clear "Gunk" from drill pipe and backream from 14975' to 7" casing shoe Q 13921'. Pack off occurred while backreaming. Tq. 15-20K. Printed: 11/21/2005 11:48:31 AM BP Exploration Page 12 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours I, Task Code I Description of Operations ~ _ NPT I Phase II 10/29/2005 ~ 22:30 - 00:00 1.50 ~ LCR ~ N ~ DPRB ~ PRODi ~ CBU 300 gpm ~ 1480 psi. At 10500 strokes mineral oil to 10/30/2005 00:00 - 02:30 2.50 LCR N DPRB PROD1 02:30 - 03:30 1.00 LCR N DPRB PROD1 03:30 - 05:30 2.00 LCR N DPRB PROD1 05:30 - 07:00 ~ 1.50 ~ LCR ~ N ~ DPRB ~ PROD1 07:00 - 09:30 2.50 LCR N DPRB PROD1 09:30 - 10:30 1.00 LCR N DPRB PROD1 10:30 - 12:00 1.50 LCR N DPRB PROD1 12:00 - 16:30 4.50 LCR N DPRB PROD1 16:30 - 19:30 3.00 LCR N DPRB PROD1 19:30 - 20:00 0.50 LCR N DPRB PROD1 20:00 - 21:30 1.50 DRILL N DPRB PROD1 21:30 - 00:00 2.50 DRILL N DPRB PROD1 10/31/2005 00:00 - 01:00 1.00 DRILL N DPRB PROD1 01:00 - 09:00 8.00 DRILL N DPRB PROD1 09:00 - 11:00 2.00 DRILL N DPRB PROD1 11:00 - 12:00 1.00 DRILL N DPRB PROD1 12:00 - 13:30 1.50 DRILL N DPRB PROD1 13:30 - 00:00 10.50 DRILL P PROD1 surface. Large quantity of "Gumk" clumps noted across shakers. Dumped 130 bbls. of contaminated mud. Increased circ. rate to 415 gpm @ 934 psi. Mud losses appear to be nominal Q 00:00. Total mud losses for 24 hrs. = 1148 bbls. (Does not include 130 bbls dumped.) Circulate gel clumps out of well until mud cleaned up. Pump 415 gpm C 950 psi, rot. 74 rpm. Metal to metal tube added. Torque values w/mill inside of casing above shoe constant @ 19.5K w/411 gpm, 894 psi, and 55 rpm. Pipe would not rotate unless moving. RIH to bottom Q 15260'. Tight spot Q 15060', break circ. and ream down f/14995' to 15095', wash down f/15095' to 15260'. Tag bottom. CBU Q 300 gpm 920 psi, 15.5 tq., 60 rpm. Up wt. 265K, SO wt. 165K, Rot. wt. 195K. Large patties of gunk pill across shakers. POH to 7" liner top w/tight hole @ 13960', pump out to 7" shoe @ 13921'. Slip and cut 80' of drilling line. Adjust draw works brakes. Inspect top drive brakes. CBU @ 575 gpm, 1200 psi, 110 rpm, tq. 19K. Circulating out chunks of gunk squeeze f/7" liner top. Fluid loss to hole 15bb1/hr. POH and rack back 5" drill pipe. LD 15 jts. 4" drill pipe, pulling wet-pumped dry job, BD, continue LD 87 jts. 4" drill pipe, rack drill collars, and UD mill. No wear on mill cutting surfaces. Drain stack and function test lower pipe, blind, and upper pipe rams. PU 6-1/8" drilling BHA # 18 w/Hycalog DS277H+GJNU, AIM PDM 1.50 deg. motor, MWD, PWD and RIH. PU 4" drill pipe and single in, shallow test MWD C~3 1000', cont. single in to 1900'. Rig repair on Baylor electric brake system. Replace hydraulic hose on iron roughneck. Load pipeshed and PU 4" drill pipe singles to reach max. TD of 20741'. RIH w/5" drill pipe to 7" shoe @ 13921'. Circulate 45 bbl. (4 drums) EP mud tube pill to annulus @ 290 gpm, 1450 psi, 60 rpm. Tq. 18K before sweep, 10K tq. after sweep. Losses Q at 12 bbls./hr. RIH to15058'. Wash down to 15260' w/no difficulty. Drill directionally and backream @ each connection per program f/15260' to 15627' w/AIM 1:50 deg. assy. Up wt. 250K, SO wt. 150K, Rot wt 187K, 300 gpm, 1900 psi, 80 rpm, 9K tq. off, 11 K tq. on. ROP = 47.4. ECDs 9.15 calc./9.2 act. Some difficulty dropping angle through Eileen to target # 3. Mud losses = 183 bbls. total, 4 bph while tripping increasing to 16 bbls/hr drilling w/300 gpm, 1900 psi. Stringing in 150 #/hr Printed: 11/21/2005 11:48:31 AM i BP Exploration Page 13 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: I Task Code ~ NPT Phase Description of Operations Date ,From - To Hours ~_ _ ~ -- _ __ --- _-_ _ -_ 10/31/2005 13:30 - 00:00 10.50 DRILL P PROD1 MIX II coarse into mud system. Well took 12 barrel drink and losses increased to 23 bbls/hr from 15540' to 15560'. MIX II i coarse increased to 250 #/hr. 11/1/2005 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 11/2/2005 ~ 00:00 - 06:00 ~ 6.00 ~ DRILL ~ P 06:00 - 00:00 I 18.001 DRILL I P AST = 6.67, ART = 1.07, ADT = 7.74 PROD1 Drill directionally from 15627' to 15911'. Up wt. 248K, SO wt. 155K, Rot wt 187K, 300 gpm, 2080 psi, sliding, 11 K tq. off. ECDs 9.2 calculated vs. 9.14 actual. Well taking 28 bbls/hr. at 12:00. Adding MIX II coarse LCM at 150 lbs./hr. and MI Seal medium at 240 lbs./hr. PROD1 Drill directionally from 15911' to 16482'. Up wt. 245K, SO wt. 158K, Rot wt 190K, 300 gpm, 2325 psi on, 2080 psi off, tq. 18k on, tq. 11 K off, 80 rpm. ECDs 9.28 calculated vs. 9.31 actual. Mud wt. 8.5 ppg. The rig team agreed to try two cups P-4 lost circulation material directly to the drill string at the rate of one cup per stand. No difficulty was noted and no reduction in fluid losses occurred. All lost circulation additives were discontinued at 22:00 to alleviate screen plugging. At 00:00 losses remained constant at 28 bbls./hr. Mud losses for 24 hrs. = 27bbls./hr = 649 bbls. ADT = 14.4 hours, AST = 8.02 hours, ART = 6.45 hours. PROD1 Drill directionally from 16482' to 16775'. Up wt. 248K, SO wt. 158K, Rot. wt 193K, 300 gpm, 2325 psi on, 2080 psi off, Tq. 18k on, Tq. 13K off, 80 rpm. ECDs 9.31 calculated vs. 9.36 actual. Well taking 30 bbls/hr. @ 05:00. No LCM additives since 22:00. PROD1 Drill directionally from 16775' to 17745', 9022 TVD. Up wt. 248K, SO wt. 153K, Rot. wt 193K, 300 gpm, 2140 psi on, 1900 psi off, Tq. 18k on, Tq. 13K off, 80 rpm. ECDs 9.49 calculated vs. 9.51 actual. Fluid loss total for 24 hrs. = 928 bbls, losses increased f/30 bbls/hr to 40 bbls./hr. Adding Mix II C, Nutplug M and M-I seal M while drilling. Lube 776 added as torque increases. 11/3/2005 100:00 - 10:00 I 10.001 DRILL I P 10:00 - 11:30 1.50 DRILL P 11:30 - 15:00 3.50 DRILL P 15:00 - 16:00 1.00 DRILL P 16:00 - 17:30 1.50 DRILL P ADT = 15.06, AST = 8.29, ART = 6.52. PRODi Drill directionally from 17745' to 18087' . Up wt. 250K, SO wt. 153K, Rot. wt 190K, 300 gpm, 2140 psi on, 2050 psi off, Tq. 18k on, Tq. 14K off, 80 rpm. ECDs 9.55 calculated vs. 9.57 actual. Losses = 40 bbls./hr. Adding 3 sacks/hr of Alpine drilling beads to lower torque values. PROD1 Pump 45 bbls of 45 Ib./bbl LCM pill, 300 gpm, 1950 psi. and displace to bit w/253 bbls of Flo-Pro mud. PROD1 POH to 16100'. Pulled ok, no hole problems. MW in 8.5 lbs./gal, MW out 8.5 lbs./gal. PROD1 Pump 2nd 45 Ibs/bbl. LCM pill and displace to bit w/Flo-Pro mud at 206 gpm, 850 psi. PROD1 Continue POH to 7" shoe at 13921'. Printed: 11/21/2005 11:48:31 AM BP Exploration Page 14 of 19 Operations Summary Report Legal Well Name: W-07 Common W ell Name: W-07 Spud Date: 2/16/1989 Event Nam e: REENTE R+COM PLET E Start : 10/5/2005 End: 11/15/2005 Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: 11/15/2005 Rig Name: NABOB S 7ES Rig Number: Date From - To ' Hours Task ~, Code - _ ' NPT ~- i Phase j Description of Operations - - - -__ __ _ _ _- 11/3/2005 17:30 - 19:30 2.00 DRILL P PROD1 Pump 45 bbl. EP Lube sweep 280 gpm, 1650 psi, rotating 80 rpm. Displace w/692 bbls. and spot top of sweep at 3710' and bottom of sweep at 4629' in drill pipe x 9-5/8" annulus. 19:30 - 20:30 1.00 DRILL P PRODi BD topdrive, RU and RIH w/ Halliburton 9-5/8" RTTS stormpacker and set 62' below RKB. Up wt. 220K, SO wt 150K. Back off 20+ rds w/backoff sub and POH w!2 jts. drill pipe. Pressure test packer to 1000 psi. 20:30 - 21:30 1.00 BOPSU P PROD1 Pull wear bushing. RU to test BOP. Chuck Scheve waived his presence as AOGCC witness to the test. Test witnessed by Lowell Anderson, BP WSL and Chris Weaver, Nabors Tourpusher. 21:30 - 00:00 2.50 BOPSU P PROD1 RIH w/test plug and perform BOP test 250 psi low and 3500 psi high. 11/4/2005 00:00 - 02:30 2.50 BOPSU P PROD1 Continue BOP test. Test rams and annular preventer w/5" and 4" drill pipe. Repair choke manifold valve. Thaw choke line. 02:30 - 03:30 1.00 BOPSU P PROD1 RD BOP test. RIH w/wearbushing. 03:30 - 05:00 1.50 DRILL P PROD1 Slip and cut 106' drilling line. Service rig and topdrive. 05:00 - 05:30 0.50 BOPSU P PROD1 RIH w/backoff sub and 2 jts. drill pipe and rotate backoff sub 20 turns to right. PU 250K and release RTTS stormpacker. Pump 18 bbls to fill hole after releasing packer. POH and LD packer. 05:30 - 08:00 2.50 DRILL P PROD1 Monitor well for 10 minutes, static. RIH f/7" shoe at 13921' to 18093'. 08:00 - 08:30 0.50 DRILL P PRODi Circulate and wash down f/18093' to 18187'. No difficulty. 08:30 - 00:00 15.50 DRILL P PROD1 Drill directionally f/18187' to 18943'. Up wt. 253K, SO wt. 1503K, Rot. wt 190K, 300 gpm, 2300 psi on, 1890 psi off, Tq. 17k on, Tq. 12K off, 80 rpm. ECDs 9.76 calculated vs. 9.61 actual. Mud losses total for 24 hrs. = 802 to formation, 122 lost to dumping of EP MudLube sweep and when LCM pills returned to surface. Mud loss rate at 23:30 = 36 bbls/hr. Stringing in Mix II C, Mix II M, Nutplug M, and Nutplug F. Pumped 30 bbl. tube pill of LUBE 776, 10 Ib/bbl drilling beads, and 10 Ib/bbl Nut Plug C. Torque drop minimal at 300 ft. lbs. for 5 hrs. ADT = 10.31, AST = 2.81, ART = 7.5 Total footage for 24 hrs. = 759. 11/5/2005 00:00 - 06:00 6.00 DRILL P PROD1 Drill directionally f/18943' to 19360'. Up wt. 253K, SO wt. 150K, Rot. wt 190K, WOB 12, 300 gpm, 2290 psi on, 2050 psi off, Tq. 17k on, Tq. 13K off, 80 rpm. ECDs 9.75 calculated vs. 9.73 actual. Mud loss rate at 06:00 = 35/hr. 06:00 - 19:30 13.50 DRILL P PROD1 Drill directionally f/19360' to 20113' and TD well per geo at oil/water contact. Up wt. 260K, SO wt. 150K, Rot. wt 190K, WOB 12, 300 gpm, 2330 psi on, 2150 psi off, Tq. 17k on, Tq. 12K off, 80 rpm. ECDs 9.89 calculated vs. 9.86 actual. Mud losses for 24 hrs. = 839 bbls. Loss rate at TD point 20113' = 36 bbls./hr. Stringing in LCM additives as follows: Nutplug C, Mix II C & M, Flo-Vis Plus, Alpine Drill beads, Lube 776. Printed: 11/21/2005 11:48:31 AM • BP Exploration Page 15 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Date ~ From - To , Hours j Task ~, Code li NPT ' Phase I Description of Operations 11/5/2005 06:00 - 19:30 13.50 DRILL P PRODi ADT = 12.31, AST = 4.85, ART = 7.46 19:30 - 20:15 0.75 DRILL P PROD1 Circulate Pump 190 bbls. (OH annulus 20113' to 13921' volume + 60 bbls.) at 300 gpm, 2150 psi, 80 rpm,Tq. off 12K. 20:15 - 00:00 3.751 DRILL P PROD1 POH (/20113' to 17526'. Attempted to pull stands off bottom. Hole swabbed immediately. Backreamed rotating 80 rpm, 300 gpm, 2100 psi. Tq. 12K. Check for swabbing every 10 stands. 11/6/2005 00:00 - 03:00 3.00 DRILL P PRODi POH to 17526' backreaming and checking for swabbing every 10stands--hole swabbed for 2587', from TD to 17526'. No swabbing above 17526'. 03:00 - 03:30 0.50 DRILL P PROD1 POH to 7" shoe at 13921'. Slip and cut 70' of drilling line. ~ Service topdrive and rig. 03:30 - 04:30 1.00 ~ DRILL P PROD1 Circulate 80 bbls (7" liner volume + 40 bbls.) Pump 290 gpm, 1580 psi, 80 rpm. Monitor well. 3 bbl. loss in 15 min. 04:30 - 07:00 2.50 DRILL P PROD1 RIH to tight spot at 14480' (took 45 K). Work pipe through tight spot and RIH to 20075'. 07:00 - 10:30 3.50 DRILL P PROD1 Wash down f/20075' to 20113'. At TD pump 35 bbls. hi-vis LCM sweep surface to surface at 300 bpm, 2016 psi. 10:30 - 19:00 8.50 DRILL P PROD1 POH f/20113' to just below shoe at 13923'. Backreamed due to swabbing, 60 rpm, 155 gpm, 850 psi, tq. 6K. 19:00 - 19:30 0.501 DRILL P PROD1 Drop dart and open circ. sub. Pump 45 bbl. LCM pill consisting i of 25 Ib./bbl each of MI SEAL F & C with 151b/bbl. each of MIX II M & C with 10 Ib./bbl. Nutplug C. Pumped pill at 418 gpm, 1315 psi. Pump 180 bbls. total to spot pill at shoe. 19:30 - 21:00 1.50 DRILL P PROD1 POH (/13923' to 12363' just below 7" liner top. 21:00 - 22:30 1.50 DRILL P PROD1 Circulate 878 bbls through circ. sub at 550 gpm, 1410 psi to clean up 7" liner top. Per Schlumberger no rotation of BHA w/circ sub open to avoid heat damage to tools. Pump dry job, blow down lines. 22:30 - 00:00 1.50 DRILL P PROD1 POH f/12363' to 9290'. Total mud losses f/24 hrs. = 515 bbls. Stringing in MI Seal F,M,C with MIX II M & C while circulating. 11/7/2005 00:00 - 00:30 0.50 DRILL P PROD1 Continue POH standing back 5" drill pipe. 00:30 - 05:00 4.50 DRILL P PROD1 POH and lay down 264 jts. of 4" HT 40 drill pipe. 05:00 - 06:00 1.00 DRILL P PROD1 Lay down drilling BHA # 18. NOTE: Mud wt. in and out 8.5 ppg during trip. NOTE: Function test BOP rams. 06:00 - 08:00 2.00 CASE P RUNPRD Clear rig floor and rig up 4 1/2" liner running equipment. Rig up Torq-Turn and set for 4700 ft. lbs. 08:00 - 18:30 10.50 CASE P RUNPRD PJSM. Run 171 jts. of 4-1/2" 12.6# 13Cr-80 Hydril 521 liner, Baker landing collar, Halliburton float collar, and Silver Bullet float shoe. Check floats. Fill every 10 jts. Straight blade centralizers run on joints 1-165. Centralizers free floating between stop rings placed 12' from each end of joints. 18:30 - 19:00 0.50 CASE P RUNPRD Pick up liner hanger/liner top packer assembly with HRD hydraulic release running tools. 19:00 - 20:00 1.00 CASE P RUNPRD Rig down liner running equipment, change out to short bails, clear rig floor. 20:00 - 21:30 i.50 CASE P RUNPRD Circulate 294 bbls. at 294 gpm, 555 psi. Install Pai Mix polymer in liner top packer extension sleeve. Rig down Printed: 11/21!2005 11:48:31 AM BP Exploration Page 16 of 19 Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2/16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11/15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Hours Task Code' NPT ', Phase Description of Operations Date ,From - To -~--- - 11/7/2005 20:00 - 21:30 1.50 CASE P RUNPRD headpin and blow down lines. 21:30 - 00:00 2.50 CASE P RUNPRD RIH with liner picking up 57 jts of 4" HT 40 drill pipe and RIH to 8194'. Mud losses in 24 hrs 228 bbl. 9.5 bbls/hr. 11/8/2005 00:00 - 04:00 4.00 CASE P RUNPRD RIH with 4-1/2" Hydril 521 liner to 7" shoe 13921'. 04:00 - 06:00 2.00 CASE P RUNPRD Circulate bottoms up with 4 1/2" liner at 7" shoe. Break circulation staging pumps up to 6 BPM at 685 psi. UP WT 195k, DN WT 150k. Loosing mud at 20 BPH 06:00 - 06:30 0.50 CASE P RUNPRD MU Cement head to single of drill pipe and lay down same. 06:30 - 11:00 4.50 CASE P RUNPRD RIH from 13,921' to 20,080'. Fill drill pipe every 10 stands. 11:00 - 12:00 1.00 CASE P RUNPRD PU cement head and MU cement lines. Attempt to break circulation, packed off. Work pipe trying to establish returns with no success. Up WT 275k, DN WT 125k 12:00 - 13:00 i.00 CASE N DPRB RUNPRD LD cement head and single drill pipe. MU Top drive and attempt to establish circulation while POH F/ 20113' to 19143' every 5 stands pulled. No success. NOTE: Mud WT 8.5 ppg 13:00 - 20:00 7.00 CASE N DPRB RUNPRD Cont' POH f/ 19143' to 15600' attempting to break circulation every 10 stands pulled. cont' POH f/ 15600' to 14593' while pulling pumping at 2 bpm @ 670 psi estab{ished returns at 14593' cont pumping out of the hole pulling 4 1/2" liner into 7" liner to 13740'. 20:00 - 22:30 2.50 CASE N DPRB RUNPRD Circulate and condition mud staging pumps up 3 BPM Q 415 psi. 4 BPM C~ 470 psi w/ 10 BPH loss / 5 BPM @ 555 psi w/ 14 BPH Loss / 6 BPM Q 580 psi Losses rose to 28 BPH and tapered off to 8-9 BPH after bottoms up and hole cleaned up. Heavy LCM and sand seen at shakers. Monitored well, Static with no losses seen pumps down. 22:30 - 23:00 0.50 CASE N DPRB RUNPRD RIH f/ 13740' to 14100' without circulation. 23:00 - 00:00 1.00 CASE N DPRB RUNPRD Break Circulation and RIH f/ 14100' to 14688' pumping C~3 4 BPM w/ 460 psi. Losses 8-9 BPH while pumping down. Mud Losses Last 24 Hrs. 462 bbls. 11/9/2005 00:00 - 07:00 7.00 CASE N DPRB RUNPRD RIH staging in f/ 14688' to 20075'. RIH 5 stands dry and pumping down 5 stands @ 4 BPM w/630 psi every other 5 stands. Losses 8-9 BPH. incressed to 20 BPH when liner top packer entered 7" liner 07:00 - 07:30 0.50 CASE N DPRB RUNPRD PU cement head on single drill pipe and MU cement line. Wash down and tag bottom Cam? 20113' pumping C~3 4 BPM w/ 780 psi. 07:30 - 10:15 2.75 CASE P RUNPRD Circulate staging pump rate up to 5 BPM, 920 psi. reciprocate liner while circulating, UP WT 250k, DN WT 150k. PJSM held with cementers and batch mix cement. 10:15 - 13:00 2.75 CEMT P RUNPRD -Pump 5 bbls water & test lines to 4000 psi. Pump 45 bbls 9.5 ppg Mud Push ll. - Pump 192 bbls (701 SX) 15.8 ppg Class G tail cement w/ 1.5 ppb CemNET @ 5 BPM. - Wash up cementers through tee (not on top of plug) Drop dart & displace cement with 96 bbl pert pill followed by 220 bbls of 8.5 ppg flo-pro mud. - Reciprocate string as cement going around shoe. Loss 46 Printed: 11/21/2005 11:48:31 AM • BP Exploration Page 17 of 19 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To II W-07 W-07 REENTE NABOB NABOB Hours ' R+COM S ALASK S 7ES Task PLET A DRI '~ Code E LLING NPT Start I Rig Rig Phase Spud Date: 2/16/1989 : 10/5/2005 End: 11/15/2005 Release: 11/15/2005 Number: ~! Description of Operations 11/9/2005 10:15 - 13:00 2.75 CEMT P RUNPRD bbls after cement rounded corner - Bump plug w/ 1630 psi & increase pressure to 2500 psi. Bleed off pressure & check floats -floats holding. - S/O 50K to ensure hanger set. Pressure to 4000 psi to release HR setting tool. PU to expose dog sub, S/O and set ZXP packer, Saw an indication of shear. Repeat sequence w/ rotation @ 15 RPM to ensure packer set. - Apply 1000 psi to string & P/U string 10' circulating as pressure began to decrease. Circulate 60 bbis C~3 10 BPM, 1070 psi to move cement above liner top. 13:00 - 13:15 0.25 CEMT P RUNPRD LD cement head & 1 jt 5" DP. blow down lines. 13:15 - 15:15 2.00 CEMT P RUNPRD MU top drive and pump at 10 BPM 1070 psi & circulate out cement. Approximately 40 bbls contaminated cement seen at surface. 15:15 - 15:30 0.25 CASE P RUNPRD Stand back one stand 5" drill pipe and LD 10' pup joint 15:30 - 18:00 2.50 CASE P RUNPRD Displace well with 880 bbis 8.5 ppg sea water pumping at 10 bpm @ 1085 psi. Clean out from under shakers and clean trip tank. 18:00 - 00:00 6.00 CASE P RUNPRD POH with liner running tool to 1816' 11/10/2005 00:00 - 01:00 1.00 CASE P RUNPRD Cut & Slip 143' drilling line and service rig 01:00 - 03:00 2.00 CASE P RUNPRD POH laying down 4" drill pipe and liner running tool Note: Cement stringers on outside of tube and tool joints of last 6 stands of 5" drill pipe and all 4" drill pipe. 03:00 - 03:30 0.50 CASE P RUNPRD Clean and clear rig floor of vendors tools 03:30 - 04:00 0.50 CASE P RUNPRD Pressure test casing to 3500 psi and hold for 30 min. 04:00 - 05:30 1.50 PERFO P OTHCMP PJSM with Schlumberger TCP on picking up 2.5" Perf Guns. & RIH PU 42 - 2.5" 4 SPF 2506 Power Jet Guns. 890' 05:30 - 15:00 9.50 PERFO P OTHCMP RU 2 7/8" handling equipment and RIH PU 177 Joints 2 7/8" PAC drill pipe. 1.5:00 - 15:30 0.50 PERFO P OTHCMP RD 2 7/8" handling equipment, RU 4" handling equipment & MU XO's. 15:30 - 17:30 2.00 PERFO P OTHCMP RIH picking up 57 Joints 4" drill pipe. 17:30 - 00:00 6.50 PERFO P OTHCMP Change out to 5" handling equipment and RIH with 5" drill pipe from derrick and tag 4 1/2" Landing Collar @ 20030'. 11/11/2005 00:00 - 00:30 0.50 PERFO P OTHCMP POH standing back 4 stands drill pipe, MU top drive and place guns on depth. Perf Interval Top shot @ 18,780' Bottom 19,650'. Close rams and pressure up to 2800 psi, bleed off pressure and open rams, after 4 min delay guns fired. Monitor well, hole initially took 3 bbl. 00:30 - 03:30 3.00 PERFO P OTHCMP POH 10 stands pulling guns above perforations, blow down top drive and kill line while monitoring well, establish loss rate at 1.5 BPH. Cont' POH total 52 stands to place Baker disconnect above 4 1/2" liner top. Note: Seawater WT 8.5 ppg. IN and OUT 03:30 - 05:00 1.50 PERFO P OTHCMP Circulate bottoms up, 245 gpm @ 3400 psi. Note: No losses while circulating bottoms up. 05:00 - 05:30 0.50 PERFO P OTHCMP Monitor well. Well Static. Pump dry job. Note: Seawater WT 8.5 ppg. IN and OUT 05:30 - 08:00 2.50 PERFO P OTHCMP POH standing back 5" drill pipe. 08:00 - 10:00 2.00 PERFO P OTHCMP Change out handling equipment to 4" and POH laying down 4" drill pipe. 10:00 - 10:30 0.50 PERFO P OTHCMP Change out handling equipment to 2 7/8" and RU power tongs. 10:30 - 16:30 6.00 PERFO P OTHCMP POH laying down 2 7/8" drill pipe. Printed: 11/21/2005 11:48:31 AM • BP Exploration Page 1 s of 1 s Operations Summary Report Legal Well Name: W-07 Common Well Name: W-07 Spud Date: 2!16/1989 Event Name: REENTER+COMPLETE Start: 10/5/2005 End: 11%15/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/15/2005 Rig Name: NABOBS 7ES Rig Number: Date II~ From - To ~ Hours '~ Task '~ Code ~ NPT Phase I, Description of Operations 116:30 - 19:30 - ~_ ~ - - - - --_ -- - - - 11/11/2005 ~ 3.00 ~ PERFOB P ~ OTHCMP PJSM with Schlumberger TCP and rig crew and lay down 42 19:30 - 20:00 I 0.501 PERFOBI P 20:00 - 21:30 I 1.501 PERFOBI N 21:30 - 00:00 2.50 PERFO N 11/12/2005 .00:00 - 06:00 6.00 PERFO N 06:00 - 08:00 2.00 PERFO N 08:00 - 10:00 I 2.00 PERFO N 10:00 - 10:30 0.50 PERFO N 10:30 - 21:30 11.00 PERFO N 21:30 - 23:00 1.50 PERFO N 23:00 - 23:30 I 0.50 I P 23:30 - 00:00 0.50 11/13/2005 00:00 - 02:00 2.00 02:00 - 02:30 0.50 02:30 - 03:00 0.50 03:00 - 03:30 I 0.50 03:30 - 06:30 I 3.00 06:30 - 10:30 I 4.00 10:30 - 00:00 I 13.50 11/14/2005 100:00 - 08:30 I 8.50 08:30 - 10:30 I 2.00 10:30 - 12:00 { 1.50 N jts. 2.5" pert guns. All guns fired. OTHCMP Clean and clear rig floor of vendors tools. PU clean out BHA tools to rig floor. Function test rams. DPRB OTHCMP MU 7" clean out BHA #19. Bit /Bit Sub /Float Sub / XO / 15' Pup Jt. / XO / XO / 7" Csg. Scraper / 2 Boot Baskets /Bit Sub / XO DPRB OTHCMP RIH PU 57 jts. 4" drill pipe 1xi. DPRB OTHCMP RIH with 5" drill pipe out of derrick to the top of the 7" liner at 12,179'. DPRB OTHCMP MU top drive and wash down from top of 7" liner at 12,179' to the top of the 4 1!2" liner at 13,744' UP- 250k, SO-150k, RT-170k, TO-7k, 390 gpm ~ 850 psi. DPRB OTHCMP Criculate 2 x 20 bbl High vis sweeps back to back while rotating and reciprocating (~ 90 RPM, 450 gpm, 1100 psi, staying 10' above 4 1!2" liner top. Note: Sea water WT. 8.5 ppg in and out. DPRB OTHCMP Cut and slip 120' drilling line. DPRB OTHCMP POH laying down 5" drill pipe 1x1. DPRB ~ OTHCMP Change out handling equipment to 4" and POH laying down 4" drill pipe 1x1. DPRB OTHCMP LD BHA #19 Clean out boot baskets. Function test Rams Note: Loss rate 1 bph. RUNCMP Pull wear bushing RUNCMP RU tubing equipment and compensator to torque turn 4 1/2" chrome completion. RUNCMP MU landing joint and make dummy run with tubing hanger. RUNCMP PJSM with Baker, Halliburton, Nabors Casing on running completion. RUNCMP MU WLEG tail pipe and Baker S-3 packer. Baker Lock all connections up to the packer. RUNCMP Cont' RIH with 36 Tubing joints, X Nipples, 2 GLM's & Halliburton Symphony Gauge Carrier 4 1/2" 13Cr80 VAM TOP completion torque turn all connection to 4440 ft/Ibs. SFAL RUNCMP Attempt to connect Halliburton Symphony Gauge to gage carrier. Guard was too small to accept Symphony gauge. Removed same and modified guard to accept Symphony gauge. MU Symphony Gauge and I Wire and test same. RUNCMP RIH with 4 1/2" 13Cr80 VAM TOP completion. Torque turn all connection to 4440 fUlbs. Install I-Wire clamps every joint. Test Symphony gage conductitivy every 5 joints ran. Total 197 joints ran at 00:00 hrs. Fluid lost to well 24 bbls last 24 hrs. RUNCMP RIH with 4 1/2" 13Cr80 VAM TOP completion. Torque turn all connection to 4440 ft/Ibs. Install I-Wire clamps every joint. Test Symphony gage conductitivy every 5 joints ran. RUNCMP Space out tubing string placing WLEG 6' into the 4 1/2" Tie Back Extension. PU 3 Pup joints, 9.82 - 8.50 - 7.81 ( RUNCMP Up WT-165k, Down WT-100k. InstaN tubing hanger, Install I-Wire through hanger and test Printed: 11/21/2005 11:48:31 AM • BP Exploration Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-07 W-07 REENTER+COMPLETE NABOBS ALASKA DRILLING NABOBS 7ES Hours ' Task I Code ~I NPT I Start: 10/5/2005 I Rig Release: 11/15/2005 Rig Number: Page 19 of 19 Spud Date: 2/16/1989 End: 11 /15/2005 Date From - To _- , 11114!2005 10:30 - 12:00 1.50 RUN( Phase Description of Operations RUNCMP seals to 5000 psi. Note: Total control line clamps ran in hole. 291 -Full Clamps 10 -Half Clamps 3 -Stainless steel bands. 12:00 - 12:30 0.50 BUNCO RUNCMP Land tubing and RILDS. RU to reverse circulate. 12:30 - 17:30 5.00 BUNCO RUNCMP Reverse circulate 463 bbls 8.5 ppg clean sea water treated with 20 gal per 100 bbl EC1124A inhibitor followed by 217 bbls untreated sea water, pumping at 3 bpm, 80 psi. 17:30 - 18:00 0.50 BUNCO RUNCMP Drop 1 7/8" ball & roller rod and RU to set packer. 18:00 - 20:00 2.00 BUNCO RUNCMP Pressure up to 3500 psi to set S-3 packer and hold pressure for 30 min. Held. Bleed tubing down to 1500 psi. Pressure up on annulus to 3500 psi to test packer and hold for 30 min. Held. Bleed pressure off on both annulus and tubing, pressure up on annulus and shear DCR shear valve, valve sheared at 2600 psi. Pumped 2 bbls both ways through shear valve to confirm shear. 3bpm - 320 psi down-Annlus / 3 bpm - 225 psi Down-TBG. 20:00 - 21:30 1.50 BUNCO RUNCMP RD and blow down test lines. LD landing joint and install TWC and test from below to 1000 psi. Held. 21:30 - 22:30 1.00 BOPSU P RUNCMP Nipple down BOPE. 22:30 - 00:00 1.50 WHSUR P RUNCMP Nipple up adaptor flange and tree. Terminate I-wire in well head and test Symphony gage conductivity. 11/15/2005 00:00 - 01:00 1.00 WHSUR P RUNCMP Nipple up adaptor flange and test to 5000 psi and hold for 30 min. while Halliburton terminates I-wire in well head and test Symphony gage conductivity. 3452 psi down hole pressure reading obtained. 01:00 - 02:00 1.00 WHSUR P RUNCMP NU tree and test same to 5000 psi. Held. 02:00 - 02:30 0.50 WHSUR P RUNCMP Pull TWC with lubricator and RU lines to pump freeze protect. 02:30 - 03:00 0.50 WHSUR P RUNCMP PJSM with Little Red and rig crew on pumping freeze protect. 03:00 - 04:30 1.50 WHSUR P RUNCMP Pressure test lines to 3500 psi and reverse circulate 155 bbls diesel freeze protect down the 4 1/2" x 9 5/8" annulus @ 2 bpm - 850 psi FCP . 04:30 - 05:30 1.00 WHSUR P RUNCMP U-Tube freeze protect. 05:30 - 06:00 0.50 WHSUR P RUNCMP RD & blow down circulating lines. 06:00 - 08:00 2.00 WHSUR P RUNCMP RU lubricator and install BPV and test from below to 1000 psi. Install VR plugs in tubing spool outlets and secure tree. Release rig from W-07A @ 08:00 Hrs. Printed: 11/21/2005 11:48:31 AM SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ....................: Prudhoe Bay - WOA Well .....................: W-07A API number ...............: 50-029-21918-01 Engineer .................: Brinkman RIG :.....................: Nabors 7ES STATE :...................: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent........ DF above permanent.......: ------------------ Mean Sea Level Driller's Pipe Tally 53.06 ft N/A Top Drive 81.64 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 144.92 degrees [(c)2005 IDEAL ID10 2C O1] Spud date ................: 05-Oct-05 Last survey date.........: 05-Nov-05 Total accepted surveys...: 341 MD of first survey.......: 0.00 ft MD of last survey........: 20113.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............: 16-Oct-2005 Magnetic field strength..: 1151.68 HCNT Magnetic dec (+E/W-).....: 24.55 degrees Magnetic dip .............: 80.84 degrees ----- MWD survey Reference Reference G ..............: Reference H ............... Reference Dip ............: Tolerance of G...........: Tolerance of H...........: Tolerance of Dip.........: Criteria --------- 1002.68 meal 1151.68 HCNT 80.84 degrees (+/-) 2.50 meal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.55 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.55 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction v~0~ - 483 • SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 2 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.03 238.75 0.00 0.00 0.31 -0.16 -0.26 0.31 238.39 0.00 GCT MS 2 90.98 0.35 238.75 90.98 90.98 0.61 -0.32 -0.52 0.61 238.57 0.35 GCT MS 3 190.98 0.25 203.95 100.00 190.98 1.09 -0.67 -0.87 1.10 232.14 0.20 GCT MS 4 290.98 0.25 180.40 100.00 290.98 1.39 -1.09 -0.96 1.45 221.25 0.10 GCT MS 5 390.98 0.27 132.58 100.00 390.98 1.43 -1.47 -0.79 1.67 208.13 0.21 GCT MS 6 490.98 0.88 123.35 100.00 490.97 1.04 -2.05 0.03 2.05 179.18 0.62 GCT MS 7 590.98 2.72 124.30 100.00 590.92 -0.27 -3.81 2.63 4.63 145.38 1.84 GCT MS 8 690.98 5.05 129.97 100.00 690.68 -2.67 -7.98 7.96 11.27 135.04 2.36 GCT MS 9 790.98 7.65 135.92 100.00 790.06 -5.57 -15.59 15.97 22.31 134.30 2.68 GCT MS 10 890.98 9.38 137.18 100.00 888.95 -8.68 -26.35 26.14 37.11 135.22 1.74 GCT MS 11 990.98 11.33 138.95 100.00 987.32 -11.99 -39.73 38.13 55.07 136.18 1.98 GCT MS 12 1090.98 13.62 140.02 100.00 1084.95 -15.45 -56.16 52.15 76.64 137.12 2.30 GCT MS 13 1190.98 16.47 139.37 100.00 1181.52 -19.54 -75.95 68.95 102.58 137.77 2.85 GCT MS 14 1290.98 19.52 137.22 100.00 1276.61 -25.20 -98.97 89.53 133.46 137.87 3.12 GCT MS 15 1390.98 22.27 136.10 100.00 1370.03 -32.69 -124.90 114.02 169.11 137.61 2.78 GCT MS 16 1490.98 24.83 135.23 100.00 1461.69 -41.75 -153.46 141.95 209.05 137.23 2.58 GCT MS 17 1590.98 27.58 134.55 100.00 1551.41 -52.34 -184.61 173.24 253.17 136.82 2.77 GCT MS 18 1690.98 28.77 134.13 100.00 1639.56 -64.09 -217.61 207.01 300.35 136.43 1.21 GCT MS 19 1790.98 30.17 134.07 100.00 1726.61 -76.53 -251.84 242.34 349.51 136.10 1.40 GCT MS 20 1890.98 31.80 136.73 100.00 1812.35 -88.39 -288.51 278.46 400.97 136.02 2.13 GCT MS 21 1990.98 33.23 134.12 100.00 1896.67 -100.80 -326.77 316.19 454.71 135.94 2.00 GCT MS 22 2090.98 36.22 132.15 100.00 1978.86 -116.16 -365.69 357.78 511.60 135.63 3.19 GCT MS 23 2190.98 39.05 133.13 100.00 2058.04 -133.09 -407.06 402.68 572.58 135.31 2.89 GCT MS 24 2290.98 40.97 133.72 100.00 2134.63 -150.07 -451.25 449.37 636.84 135.12 1.96 GCT MS 25 2390.98 44.73 133.38 100.00 2207.93 -167.91 -498.10 498.65 704.81 134.97 3.77 GCT MS 26 2490.98 48.27 132.92 100.00 2276.76 -187.42 -547.69 551.57 777.30 134.80 3.56 GCT MS 27 2590.98 50.68 132.97 100.00 2341.73 -208.12 -599.47 607.21 853.27 134.63 2.41 GCT MS 28 2690.98 52.53 133.05 100.00 2403.83 -229.38 -652.93 664.52 931.61 134.50 1.85 GCT MS 29 2790.98 52.28 133.18 100.00 2464.84 -250.73 -707.09 722.36 1010.83 134.39 0.27 GCT MS 30 2890.98 51.83 133.28 100.00 2526.33 -271.83 -761.10 779.82 1089.67 134.30 0.46 GCT MS [(c)2005 IDEAL ID10 2C O1] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 3 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- _ displ Azim (deg/ tool Corr - (f t) (deg) (deg) (ft) (ft) (ft) (ft) (f t) (ft) (deg) 100f) type (deg) 31 2990.98 51.47 133.55 100.00 2588.38 -292.57 -815.00 836.78 1168.09 134.24 0.42 GCT MS 32 3090.98 51.07 133.87 100.00 2650.94 -312.82 -868.90 893.17 1246.09 134.21 0.47 GCT MS 33 3190.98 49.80 134.17 100.00 2714.64 -332.42 -922.47 948.61 1323.18 134.20 1.29 GCT MS 34 3290.98 49.45 134.23 100.00 2779.42 -351.56 -975.58 1003.22 1399.36 134.20 0.35 GCT MS 35 3390.98 49.28 134.38 100.00 2844.54 -370.49 -1028.59 1057.53 1475.25 134.21 0.20 GCT MS 36 3490.98 49.15 134.48 100.00 2909.86 -389.22 -1081.59 1111.60 1550.97 134.22 0.15 GCT MS 37 3590.98 48.82 134.55 100.00 2975.49 -407.77 -1134.49 1165.40 1626.42 134.23 0.33 GCT MS 38 3690.98 48.63 134.58 100.00 3041.45 -426.19 -1187.23 1218.95 1701.57 134.24 0.19 GCT MS 39 3790.98 48.55 134.57 100.00 3107.60 -444.55 -1239.87 1272.37 1776.57 134.26 0.08 GCT MS 40 3890.98 48.62 134.57 100.00 3173.75 -462.93 -1292.50 1325.80 1851.56 134.27 0.07 GCT MS 41 3990.98 49.02 134.53 100.00 3239.59 -481.39 -1345.30 1379.43 1926.83 134.28 0.40 GCT MS 42 4090.98 49.23 134.43 100.00 3305.03 -500.03 -1398.28 1433.38 2002.44 134.29 0.22 GCT MS 43 4190.98 49.50 134.37 100.00 3370.16 -518.83 -1451.37 1487.60 2078.33 134.29 0.27 GCT MS 44 4290.98 49.88 134.50 100.00 3434.85 -537.69 -1504.76 1542.05 2154.58 134.30 0.39 GCT MS 45 4390.98 50.18 134.62 100.00 3499.09 -556.48 -1558.53 1596.66 2231.22 134.31 0.31 GCT MS 46 4490.98 50.65 134.80 100.00 3562.81 -575.17 -1612.75 1651.43 2308.29 134.32 0.49 GCT MS 47 4590.98 52.10 135.22 100.00 3625.23 -593.72 -1668.01 1706.66 2386.40 134.34 1.49 GCT MS 48 4690.98 53.95 135.60 100.00 3685.37 -612.15 -1724.90 1762.74 2466.28 134.38 1.87 GCT MS 49 4790.98 55.75 136.05 100.00 3742.94 -630.44 -1783.54 1819.71 2548.01 134.42 1.84 GCT MS 50 4890.98 57.27 136.17 100.00 3798.12 -648.69 -1843.64 1877.53 2631.37 134.48 1.52 GCT MS 51 4990.98 57.60 136.10 100.00 3851.95 -667.09 -1904.41 1935.93 2715.62 134.53 0.34 GCT MS 52 5090.98 57.95 135.93 100.00 3905.27 -685.74 -1965.27 1994.68 2800.19 134.57 0.38 GCT MS 53 5190.98 58.00 136.10 100.00 3958.30 -704.43 -2026.28 2053.56 2884.94 134.62 0.15 GCT MS 54 5290.98 58.05 136.28 100.00 4011.26 -722.88 -2087.49 2112.28 2969.74 134.66 0.16 GCT MS 55 5390.98 58.20 136.32 100.00 4064.06 -741.18 -2148.89 2170.95 3054.62 134.71 0.15 GCT MS 56 5490.98 57.75 136.32 100.00 4117.09 -759.43 -2210.20 2229.50 3139.37 134.75 0.45 GCT MS 57 5590.98 58.03 136.85 100.00 4170.25 -777.28 -2271.73 2287.72 3224.03 134.80 0.53 GCT MS 58 5690.98 58.02 137.30 100.00 4223.20 -794.45 -2333.84 2345.49 3308.80 134.86 0.38 GCT MS 59 5790.98 58.23 137.72 100.00 4276.01 -811.00 -2396.46 2402.85 3393.63 134.92 0.41 GCT MS 60 5890.98 58.60 137.85 100.00 4328.38 -827.20 -2459.55 2460.08 3478.71 134.99 0.39 GCT MS [(c)2005 IDEAL ID10 2C O1] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 4 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth. section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (f t) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5990.98 59.07 138.08 100.00 4380.13 -843.21 -2523.11 2517.38 3564.16 135.07 0.51 GCT MS 62 6090.98 59.18 138.27 100.00 4431.45 -858.97 -2587.07 2574.61 3649.87 135.14 0.20 GCT MS 63 6190.98 59.87 138.48 100.00 4482.17 -874.49 -2651.49 2631.86 3735.92 135.21 0.71 GCT MS 64 6290.98 59.67 138.72 100.00 4532.51 -889.71 -2716.30 2689.00 3822.17 135.29 0.29 GCT MS 65 6390.98 59.65 139.12 100.00 4583.03 -904.45 -2781.36 2745.71 3908.31 135.37 0.35 GCT MS 66 6490.98 59.50 139.35 100.00 4633.67 -918.70 -2846.67 2802.02 3994.35 135.45 0.25 GCT MS 67 6590.98 59.40 139.45 100.00 4684.50 -932.69 -2912.05 2858.06 4080.26 135.54 0.13 GCT MS 68 6690.98 58.95 139.33 100.00 4735.74 -946.66 -2977.24 2913.95 4165.95 135.62 0.46 GCT MS 69 6790.98 58.70 139.38 100.00 4787.50 -960.62 -3042.16 2969.69 4251.33 135.69 0.25 GCT MS 70 6890.98 58.55 139.45 100.00 4839.57 -974.47 -3107.00 3025.23 4336.53 135.76 0.16 GCT MS 71 6990.98 58.20 139.57 100.00 4892.00 -988.15 -3171.76 3080.52 4421.50 135.84 0.36 GCT MS 72 7090.98 58.05 139.68 100.00 4944.81 -1001.61 -3236.45 3135.53 4506.24 135.91 0.18 GCT MS 73 7190.98 57.95 139.70 100.00 4997.80 -1014.97 -3301.12 3190.39 4590.86 135.98 0.10 GCT MS 74 7290.98 58.25 139.78 100.00 5050.65 -1028.26 -3365.91 3245.26 4675.58 136.05 0.31 GCT MS 75 7390.98 57.88 139.85 100.00 5103.54 -1041.44 -3430.74 3300.02 4760.26 136.11 0.37 GCT MS 76 7490.98 57.57 140.03 100.00 5156.94 -1054.39 -3495.45 3354.43 4844.63 136.18 0.35 GCT MS 77 7590.98 57.38 140.15 100.00 5210.71 -1067.09 -3560.13 3408.53 4928.75 136.25 0.22 GCT MS 78 7690.98 57.33 140.18 100.00 5264.65 -1079.66 -3624.79 3462.47 5012.76 136.31 0.06 GCT MS 79 7790.98 57.45 140.20 100.00 5318.54 -1092.20 -3689.49 3516.40 5096.81 136.38 0.12 GCT MS 80 7890.98 57.25 140.10 100.00 5372.49 -1104.79 -3754.14 3570.35 5180.82 136.44 0.22 GCT MS 81 7990.98 56.82 140.17 100.00 5426.90 -1117.35 -3818.53 3624.13 5264.55 136.50 0.43 GCT MS 82 8090.98 56.32 140.18 100.00 5482.00 -1129.80 -3882.63 3677.58 5347.84 136.55 0.50 GCT MS 83 8190.98 55.78 140.18 100.00 5537.84 -1142.16 -3946.34 3730.70 5430.63 136.61 0.54 GCT MS 84 8290.98 55.28 140.20 100.00 5594.44 -1154.43 -4009.67 3783.48 5512.91 136.66 0.50 GCT MS 85 8390.98 54.95 140.12 100.00 5651.63 -1166.68 -4072.66 3836.03 5594.79 136.71 0.34 GCT MS 86 8490.98 55.45 139.97 100.00 5708.70 -1179.11 -4135.60 3888.77 5676.77 136.76 0.51 GCT MS 87 8590.98 56.13 139.92 100.00 5764.93 -1191.77 -4198.90 3941.98 5759.34 136.81 0.68 GCT MS 88 8690.98 56.72 139.92 100.00 5820.23 -1204.56 -4262.65 3995.63 5842.53 136.85 0.59 GCT MS 89 8790.98 57.43 139.93 100.00 .5874.58 -1217.44 -4326.88 4049.67 5926.35 136.90 0.71 GCT MS 90 8890.98 58.13 139.90 100.00 5927.90 -1230.43 -4391.60 4104.14 6010.84 136.94 0.70 GCT MS [(c)2005 IDEAL ID10 2C Ol] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 5 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8990.98 58.75 139.97 100.00 5980.24 -1243.49 -4456.82 4158.99 6095.93 136.98 0.62 GCT MS 92 9090.98 59.28 140.07 100.00 6031.72 -1256.50 -4522.51 4214.07 6181.54. 137.02 0.54 GCT MS 93 9190.98 59.88 140.00 100.00 6082.35 -1269.57 -4588.60 4269.46 6267.66 137.06 0.60 GCT MS 94 9290.98 60.15 140.03 100.00 6132.33 -1282.72 -4654.97 4325.12 6354.16 137.10 0.27 GCT MS 95 9390.98 59.80 140.03 100.00 6182.37 -1295.85 -4721.32 4380.74 6440.63 137.14 0.35 GCT MS 96 97 9490.98 9590.98 59.25 58.72 139.95 139.70 100.00 100.00 6233.08 6284.61 -1308.97 -1322.27 -4787.33 -4852.82 4436.15 4491.44 6526.71 6612.32 137.18 137.21 0.55 0.57 GCT GCT MS MS 98 9690.98 58.43 139.72 100.00 6336.75 -1335.67 -4917.91 4546.62 6697.57 137.25 0.29 GCT MS 99 9790.98 57.95 139.68 100.00 6389.46 -1349.04 -4982.72 4601.58 6782.48 137.28 0.48 GCT MS 100 9890.98 57.47 139.73 100.00 6442.88 -1362.33 -5047.19 4656.25 6866.94 137.31 0.48 GCT MS 101 9990.98 56.38 139.88 100.00 6497.45 -1375.36 -5111.20 4710.33 6950.65 137.34 1.10 GCT MS 102 10090.98 55.07 140.67 100.00 6553.77 -1387.54 -5174.75 4763.14 7033.18 137.37 1.46 GCT MS 103 10190.98 53.77 141.42 100.00 6611.95 -1398.45 -5237.99 4814.28 7114.34 137.41 1.44 GCT MS 104 10290.98 53.52 142.88 100.00 6671.23 -1407.71 -5301.58 4863.69 7194.60 137.47 1.20 GCT MS 105 10390.98 53.05 144.13 100.00 6731.02 -1415.04 -5366.02 4911.37 7274.32 137.53 1.11 GCT MS 106 10490.98 52.62 146.77 100.00 6791.43 -1419.63 -5431.64 4956.56 7353.25 137.62 2.15 GCT MS 107 10590.98 52.27 149.17 100.00 6852.39 -1420.71 -5498.84 4998.61 7431.24 137.73 1.93 GCT MS 108 10690.98 53.48 149.68 100.00 6912.75 -1419.77 -5567.49 5039.16 7509.33 137.85 1.28 GCT MS 109 10790.98 56.08 149.97 100.00 6970.41 -1418.24 -5638.10 5080.22 7589.26 137.98 2.61 GCT MS 110 10890.98 58.00 150.67 100.00 7024.82 -1415.93 -5711.00 5121.76 7671.24 138.11 2.01 GCT MS 111 10990.98 59.42 151.25 100.00 7076.75 -1412.63 -5785.71 5163.23 7754.58 138.25 1.50 GCT MS 112 11090.98 59.03 151.63 100.00 7127.92 -1408.60 -5861.17 5204.31 7838.25 138.40 0.51 GCT MS 113 11190.98 58.43 152.18 100.00 7179.83 -1403.90 -5936.57 5244.56 7921.39 138.54 0.76 GCT MS 114 11290.98 57.60 152.87 100.00 7232.80 -1398.32 -6011.82 5283.70 8003.72 138.69 1.02 GCT MS 115 11390.98 56.78 153.55 100.00 7286.98 -1391.78 -6086.85 5321.58 8085.10 138.84 1.00 GCT MS 116 11490.98 56.03 154.58 100.00 7342.31 -1384.07 -6161.75 5358.01 8165.51 138.99 1.14 GCT MS 117 11590.98 55.40 155.83 100.00 7398.65 -1374.79 -6236.76 5392.66 8244.87 139.15 1.21 GCT MS 118 11690.98 55.17 156.70 100.00 7455.60 -1364.04 -6312.00 5425.75 8323.47 139.32 0.75 GCT MS 119 11790.98 55.15 157.13 100.00 7512.73 -1352.38 -6387.50 5457.93 8401.74 139.49 0.35 GCT MS 120 11890.98 54.58 157.93 100.00 7570.28 -1339.90 -6463.07 5489.19 8479.53 139.66 0.87 GCT MS [(0)2005 IDEAL ID10 2C OlJ SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 6 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (f t) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 11990.98 53.80 158.02 100.00 7628.79 -1326.90 -6538.25 5519.60 8556.56 139.83 0.78 GCT MS 122 12090.98 53.13 158.05 100.00 7688.32 -1313.93 -6612.77 5549.65 8632.92 140.00 0.67 GCT MS 123 12190.98 52.70 158.12 100.00 7748.62 -1301.00 -6686.78 5579.43 8708.79 140.16 0.43 GCT MS 124 12290.98 53.00 158.12 100.00 7809.01 -1288.02 -6760.74 5609.13 8784.64 140.32 0.30 Tie-In 125 12349.00 53.25 158.42 58.02 7843.82 -1280.34 -6803.85 5626.31 8828.81 140.41 0.60 Top of Window 126 12366.00 55.30 158.42 17.00 7853.75 -1278.02 -6816.69 5631.39 8841.93 140.44 12.06 Bottom of Window 127 12399.50 57.01 160.00 33.50 7872.41 -1272.97 -6842.70 5641.26 8868.28 140.50 6.43 Inclination only 128 12495.04 61.38 166.00 95.54 7921.36 -1252.69 -6921.13 5665.14 8944.04 140.70 7.07 Inclination only 129 12589.77 62.92 173.62 94.73 7965.66 -1222.59 -7003.48 5679.90 9017.21 140.96 7.29 MWD_ IFR _MS 130 12683.65 60.01 174.45 93.88 8010.50 -1187.38 -7085.50 5688.48 9086.42 141.24 3.20 MWD IFR MS 131 12779.50 55.04 174.70 95.85 8061.95 -1152.17 -7165.97 5696.13 9154.07 141.52 5.19 MWD_ IFR _MS 132 12872.48 53.70 175.24 92.98 8116.11 -1118.78 -7241.25 5702.76 9217.22 141.78 1.52 MWD_ IFR _MS 133 12968.70 54.01 175.86 96.22 8172.87 -1083.75 -7318.72 5708.78 9281.91 142.04 0.61 MWD_ IFR _MS 134 13063.92 54.60 173.91 95.22 8228.43 -1049.69 -7395.74 5715.68 9346.97 142.30 1.77 MWD_ IFR _MS 135 13157.65 54.71 171.41 93.73 8282.66 -1018.71 -7471.55 5725.45 9413.02 142.54 2.18 MWD IFR MS 136 13253.96 53.14 174.31 96.31 8339.38 -986.94 -7548.77 5735.14 9480.29 142.77 2.93 MWD IFR MS 137 13347.37 52.96 172.87 93.41 8395.53 -955.58 -7622.95 5743.48 9544.47 143.00 1.25 MWD_ IFR _MS 138 13442.72 53.08 173.25 95.35 8452.88 -924.22 -7698.56 5752.68 9610.47 143.23 0.34 MWD IFR MS 139 13537.13 52.56 173.24 94.41 8509.94 -893.03 -7773.26 5761.53 9675..68 143.45 0.55 MWD_ IFR _MS 140 13630.87 54.43 173.59 93.74 8565.70 -861.59 -7848.11 5770.16 9741.03 143.68 2.02 MWD IFR MS 141 13726.30 55.79 170.92 95.43 8620.29 -830.39 -7925.66 5780.73 9809.83 143.89 2.70 MWD_ IFR _MS 142 13820.79 56.87 163.72 94.49 8672.73 -805.40 -8002.29 5798.00 9881.97 144.08 6.44 MWD_ IFR _MS 143 13861.99 56.57 163.70 41.20 8695.33 -796.51 -8035.35 5807.66 9914.42 144.14 0.73 MWD IFR MS 144 13918.59 57.40 165.22 56.60 8726.17 -783.66 -8081.07 5820.37 9958.94 144.24 2.69 Inclination only 145 13936.50 57.33 165.67 17.91 8735.83 -779.32 -8095.67 5824.16 9973.00 144.27 2.15 Inclination only 146 13970.08 57.58 165.70 33.58 8753.90 -771.08 -8123.10 5831.16 9999.36 144.33 0.75 MWD_ IFR _MS 147 14002.56 53.71 167.55 32.48 8772.22 -762.86 -8149.18 5837.37 10024.17 144.39 12.81 MWD_ IFR _MS 148 14035.35 50.04 169.33 32.79 8792.46 -754.18 -8174.44 5842.55 10047.73 144.45 11.98 MWD_ IFR _MS 149 14065.82 49.27 169.42 30.47 8812.19 -746.00 -8197.27 5846.83 10068.79 144.50 2.54 MWD_ IFR _MS 150 14097.73 49.40 169.73 31.91 8832.98 -737.39 -8221.07 5851.21 10090.72 144.56 0.84 MWD IFR MS C~ • [(0)2005 IDEAL ID10 2C O1] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 7 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 14129.57 50.16 170.25 31.84 8853.54 -728.59 -8245.01 5855.44 10112.68 144.62 2.69 MWD _IFR _MS 152 14161.55 51.96 172.50 31.98 8873.64 -719.01 -8269.60 5859.16 10134.90 144.68 7.85 MWD _IFR _MS 153 14193.07 54.46 175.56 31.52 8892.52 -708.23 -8294.70 5861.77 10156.89 144.75 11.10 MWD _IFR _MS 154 14224.09 56.89 175.73 31.02 8910.01 -696.64 -8320.25 5863.72 10178.88 144.83 7.85 MWD _IFR _MS 155 14235.83 57.34 176.01 11.74 8916.39 -692.14 -8330.08 5864.43 10187.33 144.85 4.32 MWD IFR MS 156 14254.82 58.65 174.77 18.99 8926.45 -684.92 -8346.13 5865.72 10201.21 144.90 8.85 MWD _IFR _MS 157 14286.64 61.13 175.93 31.82 8942.41 -672.60 -8373.56 5867.95 10224.94 144.98 8.41 MWD_ IFR _MS 158 14318.85 66.81 174.95 32.21 8956.54 -659.61 -8402.40 5870.26 10249.89 145.06 17.84 MWD IFR MS 159 14348.90 72.89 172.52 30.05 8966.89 -647.71 -8430.43 5873.35 10274.64 145.14 21.61 MWD_ IFR _MS 160 14381.10 78.58 171.92 32.20 8974.82 -635.29 -8461.33 5877.57 10302.43 145.21 17.76 MWD IFR MS 161 14413.27 79.59 171.75 32.17 8980.91 -622.90 -8492.60 5882.06 10330.67 145.29 3.18 MWD_ IFR _MS 162 14442.93 80.19 171.70 29.66 8986.12 -611.51 -8521.50 5886.26 10356.83 145.37 2.03 MWD_ IFR _MS 163 14476.24 82.33 168.57 33.31 8991.18 -599.50 -8553.93 5891.90 10386.73 145.44 11.29 MWD_ IFR _MS 164 14506.32 86.43 162.18 30.08 8994.13 -590.95 -8582.87 5899.46 10414.86 145.50 25.15 MWD ' IFR _MS 165 14538.35 88.87 157.12 32.03 8995.45 -584.90 -8612.86 5910.59 10445.88 145.54 17.53 MWD IFR MS 166 14570.33 89.28 157.05 31.98 8995.96 -580.27 -8642.31 5923.04 10477.21 145.58 1.30 MWD IFR MS 167 14600.79 89.18 156.79 30.46 8996.37 -575.94 -8670.33 5934.98 10507.08 145.61 0.91 MWD_ IFR _MS 168 14632.47 92.85 154.41 31.68 8995.81 -572.16 -8699.17 5948.06 10538.26 145.64 13.81 MWD_ IFR _MS 169 14668.26 94.19 152.19 35.79 8993.61 -569.33 -8731.08 5964.11 10573.66 145.66 7.24 MWD_ IFR _MS 170 14700.31 94.53 152.84 32.05 8991.18 -567.23 -8759.43 5978.86 10605.39 145.68 2.28 MWD IFR MS 171 14729.35 94.98 153.01 29.04 8988.77 -565.12 -8785.20 5992.03 10634.10 145.70 1.66 MWD ^ IFR _MS 172 14763.37 95.46 150.83 34.02 8985.67 -563.25 -8815.09 6007.97 10667.78 145.72 6.54 MWD IFR _MS 173 14796.71 95.91 152.27 33.34 8982.37 -561.63 -8844.26 6023.78 10700.79 145.74 4.50 MWD_ IFR _MS 174 14825.15 96.60 152.19 28.44 8979.27 -559.91 -8869.27 6036.95 10728.88 145.76 2.44 MWD_ IFR _MS 175 14858.97 96.77 152.42 33.82 8975.33 -557.83 -8899.01 6052.56 10762.25 145.78 0.84 MWD IFR MS 176 14891.44 96.94 152.18 32.47 8971.46 -555.83 -8927.56 6067.55 10794.28 145.80 0.90 MWD_ IFR _MS 177 14920.26 93.12 150.35 28.82 8968.93 -554.58 -8952.73 6081.35 10822.85 145.81 14.69 MWD_ IFR _MS 178 14950.76 92.85 150.68 30.50 8967.34 -553.64 -8979.24 6096.34 10853.21 145.83 1.40 MWD_ IFR _MS 179 14983.10 93.50 149.35 32.34 8965.55 -552.92 -9007.21 6112.48 10885.41 145.84 4.57 MWD_ IFR _MS 180 15013.53 93.40 148.44 30.43 8963.72 -552.85 -9033.21 6128.17 10915.74 145.85 3.00 MWD IFR MS • • [(c)2005 IDEAL ID10 2C O1] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 8 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle- angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 15045.42 93.36 150.48 31.89 8961.84 -552.45 -9060.63 6144.34 10947.51 145.86 6.39 MWD _IFR _MS 182 15076.47 93.67 149.95 31.05 8959.94 -551.66 -9087.53 6159.74 10978.41 145.87 1.97 MWD IFR MS 183 15107.65 96.29 149.06 31.18 8957.23 -551.25 -9114.29 6175.50 11009.41 145.88 8.87 MWD _IFR _MS 184 15140.02 96.53 148.77 32.37 8953.62 -551.16 -9141.84 6192.11 11041.53 145.89 1.16 MWD _IFR _MS 185 15172.19 97.25 147.00 32.17 8949.76 -551.64 -9168.89 6209.08 11073.45 145.89 5.90 MWD IFR MS 186 15203.57 97.33 148.57 31.38 8945.78 -552.16 -9195.23 6225.68 11104.56 145.90 4.97 MWD _IFR _MS 187 15222.32 97.41 147.38 18.75 8943.37 -552.41 -9210.99 6235.54 11123.14 145.90 6.31 MWD_ IFR _MS 188 15254.33 95.96 148.68 32.01 8939.64 -552.81 -9237.96 6252.37 11154.91 145.91 6.07 MWD _IFR _MS 189 15284.33 96.06 148.95 30.00 8936.50 -552.78 -9263.48 6267.82 11184.71 145.92 0.96 MWD IFR MS 190 15316.52 96.24 148.29 32.19 8933.06 -552.85 -9290.81 6284.48 11216.68 145.92 2.11 MWD IFR MS 191 15348.72 95.96 148.68 32.20 8929.63 -553.00 -9318.10 192 15379.20 96.03 150.47 30.48 8926.45 -552.56 -9344.24 193 15411.21 95.62 152.43 32.01 8923.20 -551.06 -9372.21 194 15443.69 94.20 153.01 32.48 8920.42 -548.82 -9400.97 195 15472.08 92.52 153.13 28.39 8918.76 -546.69 -9426.24 196 15505.35 90.91 155.23 33.27 8917.76 -543.54 -9456.17 197 15537.80 89.47 155.00 32.45 8917.65 -539.94 -9485.61 198 15569.80 87.34 155.88 32.00 8918.54 -536.22 -9514.70 199 15600.88 86.55 158.15 31.08 8920.20 -531.76 -9543.27 200 15633.17 86.45 159.70 32.29 8922.17 -526.06 -9573.34 201 15664.49 85.24 161.01 31.32 8924.44 -519.78 -9602.76 202 15695.86 83.66 163.82 31.37 8927.48 -512.41 -9632.52 203 15726.64 82.72 165.86 30.78 8931.13 -503.94 -9662.02 204 15759.86 82.21 167.28 33.22 8935.48 -493.86 -9694.05 205 15790.95 80.58 169.05 31.09 8940.13 -483.64 -9724.13 206 15822.64 79.57 169.74 31.69 8945.60 -472.64 -9754.81 207 15854.88 79.53 169.87 32.24 8951.44 -461.25 -9786.02 208 15886.49 79.42 169.32 31.61 8957.22 -450.19 -9816.59 209 15917.83 79.39 169.24 31.34 8962.98 -439.38 -9846.85 210 15949.29 79.67 169.76 31.46 8968.70 -428.42 -9877.27 6301.22 11248.66 6316.57 11278.91 6331.79 11310.61 6346.62 11342.74 6359.46 11370.87 6373.94 11403.78 6387.59 11435.82 6400.89 11467.38 6413.01 11497.85 6424.60 11529.28 6435.10 11559.56 6444.53 11589.54 6452.52 11618.50 6460.17 11649.39 6466.48 11677.93 145.93 145.94 145.96 145.98 145.99 146.02 146.04 146.07 146.10 146.13 146.17 146.22 146.26 146.32 146.38 6472.22 11706.67 146.44 6477.83 11735.78 146.50 6483.45 11764.37 146.56 6489.18 11792.79 146.61 6494.81 11821.30 146.67 1.49 5.85 6.22 4.72 5.93 7.95 4.49 7.20 7.72 4.80 5.69 10.24 7.26 4.51 7.69 MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD IFR_MS IFR_MS IFR_MS IFR_MS IFR MS IFR_MS IFR_MS IFR_MS IFR_MS IFR MS IFR_MS IFR_MS IFR_MS IFR_MS IFR MS 3.84 MWD_ IFR_ MS 0.42 MWD_ IFR_ MS 1.75 MWD_ IFR_ MS 0.27 MWD_ IFR_MS 1.85 MWD IFR MS ., • [(c)2005 IDEAL ID10 2C O1] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 9 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length- depth section +N/S- +E/W- displ. Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 15981.56 79.92 169.71 32.27 8974.42 -417.05 -9908.52 6500.47 11850.53 146.73 0.79 MWD_ IFR_MS 212 16014.10 80.16 169.27 32.54 8980.04 -405.70 -9940.03 6506.32 11880.09 146.79 1.52 MWD_ IFR_MS 213 16044.68 80.16 170.01 30.58 8985.27 -394.96 -9969.67 6511.74 11907.86 146.85 2.38 MWD_ IFR_MS 214 16076.96 80.37 169.59 32.28 8990.73 -383.53 -10000.99 6517.37 11937.16 146.91 1.44 MWD _IFR _MS 215 16108.38 80.51 169.35 31.42 8995.95 -372.57 -10031.45 6523.04 11965.78 146.97 0.88 MWD IFR MS 216 16139.55 80.71 169.18 31.17 9001.03 -361.79 -10061.66 6528.76 11994.24 147.02 0.84 MWD _IFR MS ` 217 16171.94 80.82 169.55 32.39 9006.23 -350.53 -10093.08 6534.66 12023.82 147.08 1.18 MWD _IFR _MS 218 16203.63 80.79 169.42 31.69 9011.29 -339.46 -10123.84 6540.37 12052.74 147.14 0.42 MWD _IFR _MS 219 16234.63 80.82 169.76 31.00 9016.25 -328.57 -10153.94 6545.90 12081.03 147.19 1.09 MWD _IFR _MS 220 16266.73 81.68 168.94 32.10 9021.13 -317.41 -10185.12 6551.77 12110.42 147.25 3.68 MWD IFR MS 221 16299.23 83.31 168.49 32.50 9025.38 -306.41 -10216.71 6558.07 12140.41 147.30 5.20 MWD _IFR _MS 222 16330.02 83.62 168.59 30.79 9028.88 -296.05 -10246.69 6564.15 12168.93 147.36 1.06 MWD _IFR _MS 223 16361.47 85.59 166.97 31.45 9031.84 -285.84 -10277.29 6570.78 12198.27 147.41 8.10 MWD _IFR MS ~ 224 16393.60 86.34 166.64 32.13 9034.10 -275.91 -10308.50 6578.09 12228.51 147.46 2.55 MWD IFR MS 225 16425.92 87.48 166.58 32.32 9035.84 -266.01 -10339.89 6585.57 12259.00 147.51 3.53 MWD IFR MS 226 16456.60 89.36 166.04 30.68 9036.68 -256.76 -10369.69 6592.82 12288.03 147.55 6.38 MWD _IFR _MS 227 16488.66 90.70 166.11 32.06 9036.67 -247.21 -10400.80 6600.54 12318.44 147.60 4.19 MWD _IFR _MS 228 16521.06 91.11 166.74 32.40 9036.16 -237.38 -10432.30 6608.14 12349.10 147.65 2.32 MWD _IFR _MS 229 16551.80 91.28 165.65 30.74 9035.52 -228.16 -10462.14 6615.48 12378.25 147.69 3.59 MWD _IFR _MS 230 16582.56 91.80 164.64 30.76 9034.69 -219.49 -10491.86 6623.36 12407.58 147.74 3.69 MWD IFR MS 231 16615.02 92.76 165.70 32.46 9033.40 -210.32 -10523.21 6631.66 12438.53 147.78 4.40 MWD _IFR _MS 232 16646.22 92.18 164.17 31.20 9032.05 -201.63 -10553.31 6639.76 12468.32 147.82 5.24 MWD _IFR _MS 233 16678.11 91.59 161.97 31.89 9031.00 -193.75 -10583.80 6649.04 12499.07 147.86 7.14 MWD _IFR _MS 234 16710.17 92.79 160.92 32.06 9029.78 -186.71 -10614.17 6659.24 12530.21 147.90 4.97 MWD _IFR _MS 235 16741.44 93.24 160.59 31.27 9028.13 -180.21 -10643.66 6669.53 12560.65 147.93 1.78 MWD IFR MS 236 16772.04 93.55 160.42 30.60 9026.32 -173.99 -10672.45 6679.72 12590.47 147.96 1.15' MWD _IFR _MS 237 16804.36 93.83 159.99 32.32 9024.24 -167.58 -10702.80 6690.65 12621.99 147.99 1.59 MWD _IFR _MS 238 16835.62 92.93 160.40 31.26 9022.40 -161.39 -10732.16 6701.22 12652.49 148.02 3.16 MWD _IFR MS ' 239 16867.82 91.08 160.96 32.20 9021.27 -154.74 -10762.53 6711.87 12683.89 148.05 6.00 MWD _IFR MS ~ 240 16899.91 90.39 161.71 32.09 9020.86 -147.75 -10792.92 6722.14 12715.12 148.08 3.18 MWD IFR MS • • [(c)2005 IDEAL ID10 2C O1] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 10 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 16930.94 90.67 163.48 31.03 9020.57 -140.32 -10822.53 6731.42 12745.16 148.12 5.77 MWD _IFR _MS 242 16962.41 90.53 164.63 31.47 9020.24 -132.02 -10852.79 6740.06 12775.42 148.16 3.68 MWD _IFR _MS 243 16993.77 90.91 164.95 31.36 9019.85 -123.35 -10883.05 6748.29 12805.47 .148.20 1.58 MWD _IFR _MS 244 17024.53 91.32 166.35 30.76 9019.25 -114.41 -10912.84 6755.91 12834.81 148.24 4.74 MWD _IFR _MS 245 17057.02 90.74 168.39 32.49 9018.67 -104.04 -10944.54 6763.01 12865.51 148.29 6.53 MWD IFR MS 246 17089.40 92.28 170.29 32.38 9017.81 -92.66 -10976.35 6769.00 12895.72 148.34 7.55 MWD_ IFR _M5 247 17120.53 92.14 171.42 31.13 9016.61 -80.95 -11007.06 6773.94 12924.46 148.39 3.66 MWD_ IFR _MS 248 17152.50 91.63 172.30 31.97 9015.56 -68.41 -11038.69 6778.47 12953.77 148.45 3.18 MWD_ IFR _MS 249 17183.15 91.80 171.49 30.65 9014.64 -56.37 -11069.02 6782.79 12981.89 148.50 2.70 MWD_ IFR _MS 250 17214.80 92.18 170.37 31.65 9013.54 -44.43 -11100.25 6787.77 13011.13 148.55 3.73 MWD IFR MS 251 17245.73 89.81 169.28 30.93 9013.01 -33.31 -11130.69 6793.24 13039.95 148.60 8.43 MWD_ IFR _MS 252 17278.55 88.16 170.34 32.82 9013.59 -21.52 -11162.99 6799.04 13070.55 148.66 5.98 MWD_ IFR _MS 253 17310.60 87.75 170.67 32.05 9014.73 -9.65 -11194.58 6804.33 13100.28 148.71 1.64 MWD_ IFR _MS 254 17343.12 87.07 171.12 32.52 9016.20 2.60 -11226.65 6809.47 13130.37 148.76 2.51 MWD_ IFR _MS 255 17373.49 87.10 170.19 30.37 9017.75 13.92 -11256.58 6814.39 13158.52 148.81 3.06 MWD IFR MS 256 17404.79 86.93 169.76 31.30 9019.38 25.23 -11287.36 6819.83 13187.67 148.86 1.48 MWD_ IFR _MS 257 17436.74 87.58 170.96 31.95 9020.91 36.98 -11318.82 6825.18 13217.37 148.91 4.27 MWD_ IFR _MS 258 17467.53 89.64 170.51 30.79 9021.65 48.51 -11349.20 6830.13 13245.94 148.96 6.85 MWD_ IFR _MS 259 17500.34 89.74 171.27 32.81 9021.83 60.87 -11381.60 6835.33 13276.39 149.01 2.34 MWD_ IFR _MS 260 17529.84 89.60 171.29 29.50 9022.00 72.17 -11410.75 6839.80 13303.69 149.06 0.48 MWD IFR MS 261 17562.49 89.47 169.67 32.65 9022.27 84.26 -11442.95 6845.20 13334.09 149.11 4.98 MWD_ IFR _MS 262 17594.14 89.78 170.66 31.65 9022.47 95.82 -11474.14 6850.61 13363.63 149.16 3.28 MWD_ IFR _MS 263 17626.61 90.22 171.50 32.47 9022.47 108.15 -11506.21 6855.64 13393.76 149.21 2.92 MWD_ IFR _MS 264 17656.78 90.63 170.31 30.17 9022.25 119.53 -11536.00 6860.41 13421.79 149.26 4.17 MWD_ IFR_ MS 265 17689.61 90.36 170.33 32.83 9021.97 131.60 -11568.36 6865.93 13452.43 149.31 0.82 MWD IFR MS 266 17720.84 90.26 170.07 31.23 9021.80 143.02 -11599.14 6871.24 13481.62 149.36 0.89 MWD_ IFR _MS 267 17753.12 90.05 170.12 32.28 9021.71 154.77 -11630.94 6876.80 13511.81 149.41 0.67 MWD_ IFR _MS 268 17783.29 90.39 169.26 30.17 9021.59 165.55 -11660.62 6882.20 13540.11 149.45 3.07 MWD_ IFR _MS 269 17815.69 90.67 169.36 32.40 9021.29 176.93 -11692.46 6888.21 13570.59 149.50 0.92 MWD_ IFR _MS 270 17848.16 91.04 168.98 32.47 9020.81 188.26 -11724.34 6894.31 13601.17 149.54 1.63 MWD IFR MS C~ • [(c)2005 IDEAL ID10 2C O1] SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 11 of 13 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical -------- -------- Displ -------- -------- Displ -------- -------- Total ------- ------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- type ----- - (deg) ----- --- 271 -------- 17878.68 ------ 91.52 ------- 168.27 ------ 30.52 -------- 9020.13 -------- 198.63 -------- -11754.26 -------- 6900.32 -------- 13630.00 ------- 149.59 ----- 2.81 ---- MWD_ - - IFR ----- _MS 272 17909.61 91.66 168.56 30.93 9019.27 209.04 -11784.54 6906.53 13659.27 149.63 1.04 MWD_ IFR _MS 273 17941.78 90.53 167.93 32.17 9018.66 219.77 -11816.03 6913.09 13689.75 149.67 4.02 MWD_ IFR _MS 274 17972.70 89.81 168.19 30.92 9018.56 229.99 -11846.28 6919.48 13719.10 149.71 2.48 MWD_ IFR _MS 275 18004.89 89.57 170.14 32.19 9018.74 241.22 -11877.90 6925.53 13749.46 149.76 6.10 MWD IFR MS 276 18036.44 89.95 169.78 31.55 9018.87 252.64 -11908.96 6931.03 13779.07 149.80 1.66 MWD_ IFR _MS 277 18067.10 90.39 171.48 30.66 9018.78 264.06 -11939.21 6936.02 13807.73 149.85 5.73 MWD IFR MS 278 18099.26 90.63 171.50 32.16 9018.49 276.49 -11971.02 6940.78 13837.62 149.89 0.75 MWD_ IFR _MS 279 18131.11 90.77 171.73 31.85 9018.10 288.87 -12002.53 6945.43 13867.21 149.94 0.85 MWD_ IFR _MS 280 18161.81 90.26 173.41 30.70 9017.83 301.27 -12032.97 6949.40 13895.55 149.99 5.72 MWD IFR MS 281 18193.96 88.88 175.17 32.15 9018.07 315.13 -12064.96 6952.60 13924.86 150.05 6.96 MWD_ IFR _MS 282 18225.95 88.06 175.47 31.99 9018.92 329.43 -12096.83 6955.21 13953.78 150.10 2.73 MWD_ IFR _MS 283 18256.51 88.40 174.36 30.56 9019.87 342.90 -12127.25 6957.91 13981.51 150.16 3.80 MWD_ IFR _MS 284 18288.99 88.47 173.82 32.48 9020.75 356.79 -12159.55 6961.26 14011.20 150.21 1.68 MWD_ IFR _MS 285 18320.32 90.26 173.45 31.33 9021.10 369.98 -12190.68 6964.73 14039.95 150.26 5.83 MWD IFR MS 286 18351.72 92.21 172.37 31.40 9020.42 287 18383.08 92.76 172.42 31.36 9019.07 288 18415.62 92.18 174.28 32.54 9017.66 289 18446.45 91.56 175.17 30.83 9016.66 290 18478.59 91.46 174.15 32.14 9015.81 291 18509.09 91.46 174.71 30.50 9015.03 292 18541.19 91.46 173.54 32.10 9014.21 293 18573.35 91.97 175.39 32.16 9013.25 294 18604.52 92.01 175.51 31.17 9012.17 295 18635.13 91.90 173.27 30.61 9011.13 296 18667.24 91.56 176.36 32.11 9010.16 297 18698.04 91.11 175.03 30.80 9009.44 298 18729.57 91.52 174.06 31.53 9008.71 299 18760.83 91.56 173.41 31.26 9007.88 300 18792.32 90.12 173.19 31.49 9007.41 j(C)2005 IDEAL ID10 2C O1] 382.82 -12221.83 395.39 -12252.89 408.92 -12285.17 422.42 -12315.86 436.46 -12347.85 449.67 -12378.19 463.42 -12410.11 477.37 -12442.11 491.36 -12473.16 504.60 -12503.60 518.70 -12535.56 532.65 -12566.27 546.37 -12597.65 559.57 -12628.71 572.65 -12659.98 6968.60 14068.92 6972.75 14097.96 6976.51 14127.89 6979.35 14155.97 6982.34 14185.29 6985.30 14213.16 6988.58 14242.58 6991.68 14271.99 6994.15 14300.27 6997.14 14328.30 7000.04 14357.61 150.82 7002.36 14385.55 150.87 7005.35 14414.42 150.92 7008.76 14443.23 150.97 7012.44 14472.36 151.02 150.31 7.10 MWD _IFR _MS 150.36 1.76 MWD _IFR _MS 150.41 5.98 MWD _IFR _MS 150.46 3.52 MWD _IFR _MS 150.51 3.19 MWD _IFR _MS 150.56 1.84 MWD_ IFR_ MS 150.61 3.64 MWD_ IFR_ MS 150.67 5.96 MWD_ IFR_ MS 150.72 0.41 MWD_ IFR_ MS 150.77 7.32 MWD IFR MS 9.68 MWD_ IFR_ MS 4.56 MWD _IFR _MS 3.34 MWD_ IFR_ MS 2.08 MWD_ IFR_ MS 4.63 MWD_ IFR_ MS • • SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 12 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (f t) (ft) (ft) (ft) (deg) 100f) type (deg) 301 18824.81 90.32 172.07 32.49 9007.29 585.80 -12692.20 7016.60 14502.57 151.06 3.50 MWD_ IFR _MS 302 18856.09 90.50 172.02 31.28 9007.06 598.17 -12723.18 7020.93 14531.78 151.11 0.60 MWD IFR MS 303 18886.70 89.40 172.60 30.61 9007.09 610.41 -12753.51 7025.03 14560.32 151.15 4.06 MWD_ IFR _MS 304 18917.63 89.23 172.32 30.93 9007.46 622.84 -12784.17 7029.09 14589.14 151.20 1.06 MWD IFR MS 305 18949.89 89.30 171.61 32.26 9007.88 635.56 -12816.11 7033.59 14619.31 151.24 2.21 MWD IFR MS 306 18981.35 91.04 170.43 31.46 9007.78 647.48 -12847.18 7038.50 14648.91 151.28 6.68 MWD_ IFR _MS 307 19013.12 93.03 170.77 31.77 9006.65 659.30 -12878.50 7043.69 14678.88 151.32 6.35 MWD IFR MS 308 19044.64 93.27 171.15 31.52 9004.92 671.19 -12909.59 7048.64 14708.53 151.37 1.42 MWD_ IFR _MS 309 19076.12 93.51 170.05 31.48 9003.06 682.89 -12940.59 7053.77 14738.20 151.41 3.57 MWD_ IFR _MS 310 19107.20 93.62 170.30 31.08 9001.13 694.22 -12971.15 7059.06 14767.57 151.44 0.88 MWD IFR MS 311 19138.08 93.65 170.25 30.88 8999.17 705.53 -13001.53 7064.27 14796.75 151.48 0.19 MWD_ IFR _MS 312 19170.06 93.24 170.57 31.98 8997.25 717.31 -13033.01 7069.59 14826.95 151.52 1.63 MWD IFR MS 313 19201.22 91.83 171.77 31.16 8995.87 729.18 -13063.77 7074.36 14856.27 151.56 5.94 MWD_ IFR _MS 314 19232.94 91.52 172.44 31.72 8994.94 741.75 -13095.17 7078.72 14885.96 151.61 2.33 MWD_ IFR _MS 315 19265.88 90.05 171.84 32.94 8994.49 754.83 -13127.80 7083.22 14916.81 151.65 4.82 MWD IFR MS 316 19297.00 88.20 172.53 31.12 8994.97 767.20 -13158.62 7087.45 14945.95 151.69 6.34 MWD_ IFR _MS 317 19328.66 87.48 173.46 31.66 8996.16 780.19 -13190.03 7091.31 14975.43 151.74 3.71 MWD_ IFR _MS 318 19360.34 87.03 173.44 31.68 8997.68 793.41 -13221.46 7094.92 15004.83 151.78 1.42 MWD IFR MS 319 19390.87 85.93 173.77 30.53 8999.55 806.22 -13251.74 7098.32 15033.12 151.82 3.76 MWD_ IFR _MS 320 19423.10 86.00 174.32 32.23 9001.82 819.96 -13283.72 7101.65 15062.89 151.87 1.72 MWD IFR MS 321 19455.31 86.34 173.60 32.21 9003.97 833.65 -13315.68 7105.03 15092.67 151.92 2.47 MWD_ IFR _MS 322 19486.33 86.38 175.20 31.02 9005.94 847.05 -13346.49 7108.05 15121.28 151.96 5.15 MWD_ IFR _MS 323 19518.24 86.41 175.87 31.91 9007.95 861.40 -13378.24 7110.53 15150.48 152.01 2.10 MWD_ IFR _MS 324 19550.58 86.38 175.45 32.34 9009.98 876.01 -13410.42 7112.98 15180.05 152.06 1.30 MWD_ IFR_ MS 325 19581.77 86.24 175.55 31.19 9011.99 890.02 -13441.45 7115.42 15208.61 152.10 0.55 MWD IFR MS 326 19613.35 85.97 175.01 31.58 9014.13 904.09 -13472.85 7118.01 15237.58 152.15 1.91 MWD_ IFR _MS 327 19644.77 85.86 175.04 31.42 9016.37 917.96 -13504.07 7120.73 15266.46 152.20 0.36 MWD_ IFR _MS 328 19677.71 85.62 176.09 32.94 9018.82 932.78 -13536.83 7123.27 15296.62 152.25 3.26 MWD IFR MS 329 19709.45 85.55 176.29 31.74 9021.26 947.37 -13568.40 7125.37 15325.55 152.29 0.67 MWD_ IFR_ MS 330 19739.49 85.21 175.50 30.04 9023.68 961.03 -13598.27 7127.52 15352.99 152.34 2.86 MWD IFR MS • [(c)2005 IDEAL ID10 2C O1] • SCHLUMBERGER Survey Report 6-Nov-2005 14:08:25 Page 13 of 13 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section . +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 331 19770.79 85.24 175.34 31.30 9026.29 975.03 -13629.36 7130.01 15381.69 152.38 0.52 MWD_IFR _MS 332 19802.68 85.62 175.47 31.89 9028.83 989.29 -13661.04 7132.55 .15410.95 152.43 1.26 MWD IFR MS 333 19834.39 86.72 173.36 31.71 9030.95 1002.99 -13692.53 7135.63 15440.29 152.47 7.49 MWD_IFR _MS 334 19867.97 86.83 174.41 33.58 9032.84 1017.23 -13725.87 7139.20 15471.51 152.52 3.14 MWD_IFR _MS 335 19899.40 87.06 172.69 31.43 9034.51 1030.39 -13757.05 7142.73 15500.81 152.56 5.51 MWD IFR MS 336 19929.55 87.13 174.06 30.15 9036.04 1042.94 -13786.96 7146.20 15528.96 152.60 4.54 MWD IFR MS 337 19961.35 86.65 172.57 31.80 9037.76 1056.14 -13818.50 7149.90 15558.66 152.64 4.92 MWD_IFR _MS 338 19993.64 85.93 173.05 32.29 9039.85 1069.28 -13850.47 7153.93 15588.91 152.68 2.68 MWD_IFR _MS 339 20025.25 85.72 174.33 31.61 9042.16 1082.57 -13881.80 7157.40 15618.35 152.72 4.09 MWD IFR MS 340 20056.89 84.73 175.22 31.64 9044.79 1096.40 -13913.20 7160.27 15647.57 152.77 4.20 MWD IFR MS 341 20113.00 84.15 175.22 56.11 9050.23 1121.30 -13968.85 7164.92 15699.20 152.85 1.03 Projection to TD [(c)2005 IDEAL ID10 2C 01] • W-07A Surve Report Date: 5-Nov-05 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: W-PAD / W-07 Well: W-07 Borehole: W-07A UWI/API#: 500292191801 Survey Name I Date: W-07A /November 5, 2005 Tort /AHD / DDI / ERD ratio: 428.180° / 16288.26 ft / 7.190 / 1.800 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaUlong: N 70 17 48.220, W 149 5 33.526 Location Grid N/E Y/X: N 5958925.030 ftUS, E 612048.980 ftUS Grid Convergence Angle: +0.85423761 ° Grid Scale Factor: 0.99991426 r ~ ~ .x Report '- _ __~___ i' Survey / DLS Computation Method: Minimum Curvature / Lubinski Vertical Section Azimuth: 144.920° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference Elevation: 81.64 ft relative to MSL Sea Bed /Ground Level Elevation: 53.06 ft relative to MSL Magnetic Declination: 24.545° Total Field Strength: 57583.981 nT Magnetic Dip: 80.838° Declination Date: October 16, 2005 Magnetic Declination Model: BGGM 2005 North Reference: True North Total Corr Mag North -> True North: +24.545° Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure (ft de) de ) ft ft ft) ft) ft ft ft de 100 ft ftUS ftUS tilt V.VV V.U6 L323./b -i51.b4 U.UV -V.UL V.VV U.31 -U.16 -V.Lb U.UV bybi5yZ4.t5/ bl"GU4t5./"L N/U1/4tS.ZltS W14yb:i:i.b34 GCT MS 90.98 0.35 238.75 9.34 90.98 -0.04 0.30 0.61 -0.32 -0.52 0.35 5958924.71 612048.46 N 70 17 48.216 W 149 5 33.541 190.98 0.25 203.95 109.34 190.98 0.05 0.81 1.10 -0.67 -0.87 0.20 5958924.34 612048.12 N 70 17 48.213 W 149 5 33.551 290.98 0.25 180.40 209.34 290.98 0.34 1.24 1.45 -1.09 -0.96 0.10 5958923.92 612048.04 N 70 17 48.209 W 149 5 33,554 390.98 0.27 132.58 309.34 390.98 0.75 1.67 1.67 -1.47 -0.79 0.21 5958923.55 612048.21 N 70 17 48.205 W 149 5 33.549 490.98 0.88 123.35 409.33 490.97 1.69 2.67 2.05 -2.05 0.03 0.62 5958922.98 612049.04 N 70 17 48.199 W 149 5 33.525 590.98 2.72 124.30 509.28 590.92 4.63 5.81 4.63 -3.81 2.63 1.84 5958921.26 612051.67 N 70 17 48.182 W 149 5 33.449 690.98 5.05 129.97 609.04 690.68 11.10 12.58 11.27 -7.97 7.96 2.36 5958917.18 612057.06 N 70 17 48.141 W 149 5 33.294 790.98 7.65 135.92 708.42 790.06 21.93 23.63 22.31 -15.58 15.97 2.68 5958909.69 612065.18 N 70 17 48.066 W 149 5 33.061 890.98 9.38 137.18 807.31 888.95 36.58 38.44 37.11 -26.34 26.14 1.74 5958899.08 612075.51 N 70 17 47.960 W 149 5 32.764 990.98 11.33 138.95 905.68 987.32 54.43 56.41 55.07 -39.73 38.13 1.98 5958885.88 612087.69 N 70 17 47.829 W 149 5 1090.98 13.62 140.02 1003.31 1084.95 75.93 78.01 76.64 -56.16 52.15 2.30 5958869.66 612101.95 N 70 17 47.667 W 149 5 1190.98 16.47 139.37 1099.87 1181.51 101.78 103.96 102.57 -75.95 68.95 2.85 5958850.13 612119.04 N 70 17 47.473 W 149 5 3.16 1290.98 19.52 137.22 1194.97 1276.61 132.45 134.85 133.46 -98.97 89.53 3.12 5958827.41 612139.97 N 70 17 47.246 W 149 5 30.916 1390.98 22.27 136.10 1288.39 1370.03 167.74 170.51 169.11 -124.89 114.02 2.78 5958801.86 612164.84 N 70 17 46.991 W 149 5 30.203 1490.98 24.83 135.23 1380.05 1461.69 207.16 210.46 209.04 -153.46 141.95 2.58 5958773.72 612193.19 N 70 17 46.710 W 149 5 29.389 1590.98 27.58 134.55 1469.77 1551.41 250.64 254.62 253.17 -184.61 173.24 2.77 5958743.04 612224.94 N 70 17 46.404 W 149 5 28.477 1690.98 28.77 134.13 1557.92 1639.56 297.05 301.83 300.35 -217.61 207.01 1.21 5958710.55 612259.19 N 70 17 46.079 W 149 5 27.492 1790.98 30.17 134.07 1644.97 1726.61 345.37 351.03 349.51 -251.84 242.34 1.40 5958676.85 612295.03 N 70 17 45.743 W 149 5 26.462 1890.98 31.80 136.73 1730.71 1812.35 396.14 402.50 400.97 -288.51 278.46 2.13 5958640.73 612331.68 N 70 17 45.382 W 149 5 25.410 1990.98 33.23 134.12 1815.03 1896.67 449.14 456.24 454.71 -326.77 316.19 2.00 5958603.03 612369.98 N 70 17 45.006 W 149 5 24.310 2090.98 36.22 132.15 1897.22 1978.86 504.88 513.20 511.60 -365.69 357.78 3.19 5958564.75 612412.14 N 70 17 44.623 W 149 5 23.098 2190.98 39.05 133.13 1976.40 2058.04 564.54 574.25 572.58 -407.06 402.68 2.89 5958524.06 612457.65 N 70 17 44.216 W 149 5 21.789 2290.98 40.97 133.72 2052.99 2134.63 627.54 638.54 636.84 -451.25 449.37 1.96 5958480.57 612504.98 N 70 17 43.781 W 149 5 20.429 2390.98 44.73 133.38 2126.29 2207.93 694.20 706.54 704.81 -498.10 498.65 3.77 5958434.47 612554.96 N 70 17 43.321 W 149 5 18.992 SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A Generated 1/16/2006 3:23 PM Page 1 of 9 Comments Measured Inclination Azimuth Sub-SeaTVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure (ft de ) de ft ft ft ft ft) ft ft) de 100 ft ftUS ftUS 2490 .98 48.27 132.92 2195.12 2276.76 765.20 779.06 777 .30 -547.69 551.57 3.56 5958385.67 612608.61 N 70 17 42. 833 W 149 5 17.450 2590 .98 50.68 132.97 2260.09 2341.73 839.55 855.07 853 .27 -599.47 607.21 2.41 5958334.73 612665.00 N 70 17 42. 324 W 149 5 15.828 2690 .98 52.53 133.05 2322.19 2403.83 916.24 933.44 931 .61 -652.93 664.51 1.85 5958282.13 612723.10 N 70 17 41. 798 W 149 5 14.158 2790 .98 52.28 133.18 2383.20 2464.84 993.80 1012.68 1010 .83 -707.09 722.35 0.27 5958228.85 612781.73 N 70 17 41. 265 W 149 5 12.473 2890 .98 51.83 133.28 2444.69 2526.33 1071.02 1091.54 1089. 67 -761.10 779.81 0.46 5958175.71 612839.98 N 70 17 40. 734 W 149 5 10.798 2990 .98 51.47 133.55 2506.74 2588.38 1147.87 1169.96 1168.09 -815.00 836.78 3090 .98 51.07 133.87 2569.30 2650.94 1224.39 1247.97 1246.09 -868.90 893.17 3190 .98 49.80 134.17 2633.00 2714.64 1300.09 1325.06 1323.18 -922.47 948.60 3290 .98 49.45 134.23 2697.78 2779.42 1374.94 1401.24 1399.36 -975.58 1003.22 3390 .98 49.28 134.38 2762.90 2844.54 1449.53 1477.13 1475.25 -1028.59 1057.53 3490 .98 49.15 134.48 2828.22 2909.86 1523.98 1552.84 1550.97 -1081.59 1111.60 3590 .98 48.82 134.55 2893.85 2975.49 1598.19 1628.30 1626.42 -1134.49 1165.40 3690 .98 48.63 134.58 2959.81 3041.45 1672.12 1703.45 1701.57 -1187.23 1218.95 3790 .98 48.55 134.57 3025.96 3107.60 1745.90 1778.45 1776.57 -1239.87 1272.37 3890 .98 48.62 134.57 3092.11 3173.75 1819.68 1853.45 1851.56 -1292.50 1325.80 3990 .98 49.02 134.53 3157.95 3239.59 1893.71 1928.71 1926.83 -1345.30 1379.43 4090 .98 49.23 134.43 3223.39 3305.03 1968.07 2004.32 2002.44 -1398.28 1433.38 4190 .98 49.50 134.37 3288.52 3370.16 2042.69 2080.21 2078.33 -1451.37 1487.60 4290 .98 49.88 134.50 3353.21 3434.85 2117.67 2156.47 2154.58 -1504.76 1542.05 4390 .98 50.18 134.62 3417.45 3499.09 2193.06 2233.11 2231.22 -1558.53 1596.66 4490 .98 50.65 134.80 3481.17 3562.81 2268.90 2310.17 2308.29 -1612.75 1651.43 4590 .98 52.10 135.22 3543.59 3625.23 2345.86 2388.30 2386.40 -1668.01 1706.66 4690 .98 53.95 135.60 3603.73 3685.37 2424.65 2468.18 2466.27 -1724.90 1762.74 4790 .98 55.75 136.05 3661.30 3742.94 2505.38 2549.94 2548.01 -1783.54 1819.71 4890 .98 57.27 136.17 3716.48 3798.12 2587.80 2633.34 2631.37 -1843.64 1877.52 4990 .98 57.60 136.10 3770.31 3851.95 2671.08 2717.62 2715.62 -1904.40 1935.93 5090 .98 57.95 135.93 3823.63 3905.27 2754.66 2802.21 2800.18 -1965.27 1994.68 5190 .98 58.00 136.10 3876.66 3958.30 2838.42 2886.99 2884.94 -2026.28 2053.55 5290 .98 58.05 136.28 3929.62 4011.26 2922.27 2971.82 2969.74 -2087.49 2112.28 5390 .98 58.20 136.32 3982.42 4064.06 3006.23 3056.74 3054.62 -2148.88 2170.95 5490 .98 57.75 136.32 4035.45 4117.09 3090.05 3141.52 3139.37 -2210.20 2229.50 5590 .98 58.03 136.85 4088.61 4170.25 3173.86 3226.23 3224.03 -2271.73 2287.71 5690 .98 58.02 137.30 4141.56 4223.20 3257.90 3311.05 3308.79 -2333.84 2345.48 5790 .98 58.23 137.72 4194.37 4276.01 3342.11 3395.97 3393.62 -2396.46 2402.84 5890 .98 58.60 137.85 4246.74 4328.38 3426.63 3481.16 3478.71 -2459.55 2460.08 5990 .98 59.07 138.08 4298.49 4380.13 3511.57 3566.73 3564.16 -2523.11 2517.38 6090 .98 59.18 138.27 4349.81 4431.45 3596.81 3652.56 3649.87 -2587.07 2574.61 6190 .98 59.87 138.48 4400.53 4482.17 3682.43 3738.74 3735.92 -2651.49 2631.86 6290 .98 59.67 138.72 4450.87 4532.51 3768.31 3825.14 3822.17 -2716.30 2689.00 6390 .98 59.65 139.12 4501.39 4583.03 3854.14 3911.45 3908.31 -2781.36 2745.71 6490 .98 59.50 139.35 4552.03 4633.67 3939.94 3997.68 3994.34 -2846.67 2802.01 6590 .98 59.40 139.45 4602.86 4684.50 4025.66 4083.79 4080.26 -2912.05 2858.06 SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A 0.42 5958122.67 612897.74 N 70 17 40.204 W 149 5 9.138 0.47 5958069.61 612954.92 N 70 17 39.673 W 149 5 7.495 1.29 5958016.88 613011.15 N 70 17 39.147 W 149 5 5.879 0.35 5957964.60 613066.54 N 70 17 38.624 W 149 5 4.288 0.20 5957912.41 613121.63 N 70 17 38.103 W 149 5 2.705 0.15 5957860.22 613176.48 N 70 17 37.581 W 149 5~ 0.33 5957808.14 613231.06 N 70 17 37.061 W 149 4 5 . 0.19 5957756.21 613285.38 N 70 17 36.542 W 149 4 58.001 0.08 5957704.38 613339.58 N 70 17 36.024 W 149 4 56.445 0.07 5957652.55 613393.78 N 70 17 35.507 W 149 4 54.888 0.40 5957600.56 613448.19 N 70 17 34.987 W 149 4 53.325 0.22 5957548.40 613502.92 N 70 17 34.466 W 149 4 51.753 0.27 5957496.12 613557.92 N 70 17 33.944 W 149 4 50.173 0.39 5957443.56 613613.16 N 70 17 33.419 W 149 4 48.587 0.31 5957390.61 613668.55 N 70 17 32.890 W 149 4 46.996 0.49 5957337.22 613724.12 N 70 17 32.356 W 149 4 45.400 1.49 5957282.80 613780.16 N 70 17 31.813 W 149 4 43.791 1.87 5957226.75 613837.08 N 70 17 31.253 W 149 4 42.157 1.84 5957168.97 613894.91 N 70 17 30.676 W 149 4 40.497 1.52 5957109.74 613953.61 N 70 17 30.085 W 149 4 38.813 0.34 5957049.86 614012.91 N 70 17 29.487 W 149 4 37.111 0.38 5956989.88 614072.56 N 70 17 28.889 W 149 4 35.400 0.15 5956929.77 614132.33 N 70 17 28.289 W 149 4 33.685 0.16 5956869.44 614191.96 N 70 17 27.686 W 149 4~4 0.15 5956808.94 614251.53 N 70 17 27.082 W 149 4 5 0.45 5956748.51 614310.98 N 70 17 26.479 W 149 4 28.559 0.53 5956687.86 614370.10 N 70 17 25.874 W 149 4 26.863 0.38 5956626.62 614428.79 N 70 17 25.263 W 149 4 25.180 0.41 5956564.87 614487.07 N 70 17 24.647 W 149 4 23.510 0.39 5956502.64 614545.24 N 70 17 24.026 W 149 4 21.842 0.51 5956439.95 614603.47 N 70 17 23.401 W 149 4 20.173 0.20 5956376.86 614661.65 N 70 17 22.772 W 149 4 18.506 0.71 5956313.30 614719.84 N 70 17 22.138 W 149 4 16.839 0.29 5956249.36 614777.94 N 70 17 21.500 W 149 4 15.175 0.35 5956185.16 614835.61 N 70 17 20.860 W 149 4 13.523 0.25 5956120.70 614892.87 N 70 17 20.218 W 149 4 11.883 0.13 5956056.16 614949.88 N 70 17 19.574 W 149 4 10.251 Generated 1/16/2006 3:23 PM Page 2 of 9 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea 7VD TVD Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ( ft de de ft ft ft ft) ft ft ft de 100 ft ftUS ftUS (i(iyU. yB 58.y5 l~y:;i:i 4(i54.1U 4/;15./4 4111.1:1 41(iy.ti/ 41ti5.y5 -'Ly//."L4 Ly1;i.y5 U.4(i 5y55yy1.tSL tilSUU(i./4 N /U 1/ 18.y:i:1 W 14y4t1.(i1:1 6790. 98 58.70 139.38 4705.86 4787.50 4196.29 4255.23 4251.33 -3042.16 2969.68 0.25 5955927.74 615063.42 N 70 17 18.294 W 149 4 7.000 6890. 98 58.55 139.45 4757.93 4839.57 4281.27 4340.60 4336.53 -3107.00 3025.23 0.16 5955863.74 615119.92 N 70 17 17.656 W 149 4 5.382 6990. 98 58.20 139.57 4810.36 4892.00 4366.04 4425.75 4421.50 -3171.76 3080.52 0.36 5955799.82 615176.17 N 70 17 17.019 W 149 4 3.772 7090. 98 58.05 139.68 4863.17 4944.81 4450.60 4510.67 4506.24 -3236.45 3135.53 0.18 5955735.96 615232.13 N 70 17 16.383 W 149 4 2.170 7190. 98 57.95 139.70 4916.16 4997.80 4535.05 4595.48 4590.86 -3301.12 3190.39 0.10 5955672.12 615287.95 N 70 17 15.747 W 149 4 0.572 7290. 98 58.25 139.78 4969.01 5050.65 4619.60 4680.38 4675.58 -3365.91 3245.25 0.31 5955608.17 615343.77 N 70 17 15.109 W 149 3 58.975 7390. 98 57.88 139.85 5021.90 5103.54 4704.13 4765.24 4760.26 -3430.74 3300.01 0.37 5955544.16 615399.48 N 70 17 14.471 W 149 3 57.380 7490. 98 57.57 140.03 5075.30 5156.94 4788.36 4849.79 4844.63 -3495.45 3354.43 0.35 5955480.28 615454.85 N 70 17 13.835 W 149 3 55.796 7590. 98 57.38 140.15 5129.07 5210.71 4872.38 4934.11 4928.75 -3560.13 3408.53 0.22 5955416.42 615509.90 N 70 17 13.198 W 149 3 54.220 7690. 98 57.33 140.18 5183.01 5264.65 4956.29 5018.31 5012.76 -3624.79 3462.46 0.06 5955352.58 615564.79 N 70 17 12.562 W 149 3 7790. 98 57.45 140.20 5236.90 5318.54 5040.24 5102.55 5096.80 -3689.49 3516.40 0.12 5955288.69 615619.68 N 70 17 11.926 W 149 3 7890. 98 57.25 140.10 5290.85 5372.49 5124.15 5186.74 5180.82 -3754.14 3570.35 0.22 5955224.87 615674.58 N 70 17 11.290 W 149 3 4 . 7990. 98 56.82 140.17 5345.27 5426.91 5207.76 5270.64 5264.55 -3818.53 3624.13 0.43 5955161.28 615729.31 N 70 17 10.656 W 149 3 47.943 8090. 98 56.32 140.18 5400.36 5482.00 5290.92 5354.10 5347.84 -3882.63 3677.58 0.50 5955098.00 615783.70 N 70 17 10.025 W 149 3 46.386 8190. 98 55.78 140.18 5456.20 5537.84 5373.59 5437.05 5430.63 -3946.34 3730.70 0.54 5955035.09 615837.76 N 70 17 9.399 W 149 3 44.840 8290. 98 55.28 140.20 5512.80 5594.44 5455.75 5519.49 5512.91 -4009.67 3783.48 0.50 5954972.56 615891.48 N 70 17 8.775 W 149 3 43.303 8390. 98 54.95 140.12 5569.99 5651.63 5537.50 5601.52 5594.79 -4072.66 3836.03 0.34 5954910.37 615944.96 N 70 17 8.156 W 149 3 41.773 8490. 98 55.45 139.97 5627.07 5708.71 5619.32 5683.64 5676.77 -4135.60 3888.76 0.51 5954848.22 615998.62 N 70 17 7.536 W 149 3 40.238 8590. 98 56.13 139.92 5683.29 5764.93 5701.71 5766.34 5759.34 -4198.90 3941.98 0.68 5954785.73 616052.77 N 70 17 6.914 W 149 3 38.688 8690. 98 56.72 139.92 5738.59 5820.23 5784.70 5849.65 5842.53 -4262.65 3995.63 0.59 5954722.79 616107.36 N 70 17 6.286 W 149 3 37.126 8790. 98 57.43 139.93 5792.94 5874.58 5868.32 5933.59 5926.35 -4326.88 4049.66 0.71 5954659.38 616162.34 N 70 17 5.654 W 149 3 35.553 8890. 98 58.13 139.90 5846.26 5927.90 5952.60 6018.19 6010.84 -4391.60 4104.14 0.70 5954595.48 616217.77 N 70 17 5.017 W 149 3 33.967 8990. 98 58.75 139.97 5898.60 5980.24 6037.49 6103.40 6095.93 -4456.82 4158.99 0.62 5954531.10 616273.58 N 70 17 4.376 W 149 3 32.371 9090. 98 59.28 140.07 5950.08 6031.72 6122.90 6189.13 6181.54 -4522.51 4214.07 0.54 5954466.24 616329.63 N 70 17 3.729 W 149 3 30.767 9190. 98 59.88 140.00 6000.71 6082.35 6208.82 6275.36 6267.66 -4588.60 4269.46 0.60 5954400.99 616385.99 N 70 17 3.079 W 149 3 29.155 9290. 98 60.15 140.03 6050.69 6132.33 6295.12 6361.98 6354.16 -4654.97 4325.12 0.27 5954335.47 616442.63 N 70 17 2.426 W 149 3 27.534 9390. 98 59.80 140.03 6100.73 6182.37 6381.39 6448.56 6440.63 -4721.32 4380.73 0.35 5954269.95 616499.23 N 70 17 1.773 W 149 3 25.915 9490. 98 59.25 139.95 6151.45 6233.09 6467.25 6534.74 6526.71 -4787.33 4436.14 0.55 5954204.78 616555.61 N 70 17 1.124 W 149 3~2 9590. 98 58.72 139.70 6202.97 6284.61 6552.62 6620.45 6612.32 -4852.82 4491.43 0.57 5954140.13 616611.86 N 70 17 0.479 W 149 3 3 9690. 98 58.43 139.72 6255.11 6336.75 6637.60 6705.78 6697.57 -4917.91 4546.61 0.29 5954075.88 616668.00 N 70 16 59.839 W 149 3.21.087 9790. 98 57.95 139.68 6307.82 6389.46 6722.23 6790.76 6782.48 -4982.72 4601.58 0.48 5954011.90 616723.92 N 70 16 59.201 W 149 3 19.487 9890. 98 57.47 139.73 6361.24 6442.88 6806.41 6875.29 6866.94 -5047.19 4656.25 0.48 5953948.25 616779.54 N 70 16 58.567 W 149 3 17.895 9990. 98 56.38 139.88 6415.81 6497.45 6889.87 6959.09 6950.65 -5111.20 4710.33 1.10 5953885.06 616834.57 N 70 16 57.937 W 149 3 16.321 10090. 98 55.07 140.67 6472.13 6553.77 6972.23 7041.72 7033.18 -5174.75 4763.14 1.46 5953822.31 616888.32 N 70 16 57.311 W 149 3 14.784 10190. 98 53.77 141.42 6530.31 6611.95 7053.37 7123.05 7114.34 -5237.99 4814.28 1.44 5953759.85 616940.38 N 70 16 56.689 W 149 3 13.296 10290. 98 53.52 142.88 6589.59 6671.23 7133.81 7203.58 7194.60 -5301.58 4863.69 1.20 5953697.01 616990.74 N 70 16 56.063 W 149 3 11.858 10390. 98 53.05 144.13 6649.38 6731.02 7213.94 7283.74 7274.32 -5366.02 4911.37 1.11 5953633.29 617039.37 N 70 16 55.429 W 149 3 10.470 10490. 98 52.62 146.77 6709.80 6791.44 7293.62 7363.43 7353.25 -5431.64 4956.56 2.15 5953568.36 617085.53 N 70 16 54.784 W 149 3 9.155 10590. 98 52.27 149.17 6770.75 6852.39 7372.77 7442.70 7431.24 -5498.84 4998.60 1.93 5953501.80 617128.56 N 70 16 54.123 W 149 3 7.932 10690. 98 53.48 149.68 6831.11 6912.75 7452.26 7522.43 7509.33 -5567.49 5039.16 1.28 5953433.77 617170.13 N 70 16 53.447 W 149 3 6.752 10790. 98 56.08 149.97 6888.78 6970.42 7533.64 7604.12 7589.26 -5638.11 5080.21 2.61 5953363.78 617212.23 N 70 16 52.752 W 149 3 5.558 10890. 98 58.00 150.67 6943.18 7024.82 7617.17 7688.02 7671.24 -5711.00 5121.75 2.01 5953291.52 617254.85 N 70 16 52.035 W 149 3 4.349 SurveyEditor Ver SP 1.0 Bld( doc4Ox_56) W-07\W-07\W-O7A\W-O7A Generated 1/16/2006 3:23 PM Page 3 of 9 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de (de ft ft ft ft it ft) ft de 100 ft kUS ftUS 10990. 98 59.42 151. 25 6995.11 7076.75 7702.15 7773.47 7754.57 -5785.71 5163.23 1.50 5953217.44 11090. 98 59.03 151. 63 7046.28 7127.92 7787.51 7859.39 7838.25 -5861.18 5204. 31 0.51 5953142.60 11190. 98 58.43 152. 18 7098.19 7179.83 7872.35 7944.86 7921.38 -5936.58 5244. 56 0.76 5953067.82 11290. 98 57.60 152. 87 7151.16 7232.80 7956.42 8029.68 8003.71 -6011.82 5283. 69 1.02 5952993.17 11390. 98 56.78 153. 55 7205.34 7286.98 8039.59 8113.73 8085.10 -6086.85 5321. 58 1.00 5952918.72 11490.98 56.03 154.58 7260.68 7342.32 8121.83 8197.02 8165.50 -6161.75 5358.01 1.14 5952844.38 11590.98 55.40 155.83 7317.01 7398.65 8203.12 8279.64 8244.87 -6236.76 5392.66 1.21 5952769.90 11690.98 55.17 156.70 7373.96 7455.60 8283.71 8361.84 8323.47 -6312.00 5425.75 0.75 5952695.17 11790.98 55.15 157.13 7431.09 7512.73 8364.00 8443:92 8401.74 -6387.50 5457.93 0.35 5952620.16 11890.98 54.58 157.93 7488.64 7570.28 8443.80 8525.70 8479.53 -6463.07 5489.19 0.87 5952545.07 11990.98 53.80 158.02 7547.15 7628.79 8522.80 5606.79 8556.56 -6538.25 5519.60 0.78 5952470.36 12090.98 53.13 158.05 7606.68 7688.32 8601.05 8687.14 8632.92 -6612.77 5549.65 0.67 5952396.31 12190.98 52.70 158.12 7666.98 7748.62 8678.73 8766.92 8708.79 -6686.78 5579.43 0.43 5952322.76 12290.98 53.00 158.12 7727.37 7809.01 8756.33 8846.62 8784.64 -6760.74 5609.13 0.30 5952249.25 GCT MS Tie-in Survey 12290.98 53.00 158.12 7727.37 7809.01 8756.33 8846.62 8784.64 -6760.74 5609.13 0.00 5952249.25 Top Window(Interp) 12349.00 53.25 158.42 7762.18 7843.82 8801.49 8893.03 8828.81 -6803.86 5626.31 0.60 5952206.40 Bottom Window (Blind) 12366.00 55.30 158.42 7772.11 7853.75 8814.91 8906.83 8841.93 -6816.69 5631.39 12.06 5952193.65 Blind (Inc only) 12399.50 57.01 160.00 7790.77 7872.41 8841.87 8934.66 8868.28 -6842.70 5641.26 6.43 5952167.79 Blind (Inc only) 12495.04 61.38 166.00 7839.72 7921.36 8919.77 9016.68 8944.04 -6921.13 5665.14 7.07 5952089.73 MWD+IFR+MS 12589.77 62.92 173.62 7884.02 7965.66 8995.65 9100.41 9017.21 -7003.48 5679.90 7.29 5952007.61 12683.65 60.01 174.45 7928.86 8010.50 9067.70 9182.87 9086.42 -7085.50 5688.48 3.20 5951925.74 12779.50 55.04 174.70 7980.31 8061.95 9137.95 9263.71 9154.07 -7165.98 5696.12 5.19 5951845.39 12872.48 53.70 175.24 8034.48 8116.12 9203.37 9339.28 9217.22 -7241.26 5702.75 1.52 5951770.23 12968.70 54.01 175.86 8091.23 8172.87 9270.23 9416.98 9281.91 -7318.72 5708.78 0.61 5951692.87 13063.92 54.60 173.91 8146.79 8228.43 9337.22 9494.31 9346.97 -7395.74 5715.68 1.77 5951615.97 13157.65 54.71 171.41 8201.02 8282.66 9404.88 9570.76 9413.02 -7471.55 5725.45 2.18 5951540.31 13253.96 53.14 174.31 8257.74 8339.38 9473.64 9648.59 9480.29 -7548.77 5735.14 2.93 5951463.25 13347.37 52.96 172.87 8313.89 8395.53 9539.13 9723.24 9544.47 -7622.95 5743.47 1.25 5951389.21 13442.72 53.08 173.25 8371.25 8452.89 9606.30 9799.41 9610.47 -7698.57 5752.68 0.34 5951313.75 13537.13 52.56 173.24 8428.30 8509.94 9672.51 9874.63 9675.68 -7773.26 5761.52 0.55 5951239.20 13630.87 54.43 173.59 8484.06 8565.70 9738.73 9949.98 9741.03 -7848.11 5770.16 2,02 5951164.50 13726.30 55.79 170.92 8538.65 8620.29 9808.26 10028.25 9809.83 -7925.66 5780.72 2.70 5951087.12 13820.79 56.87 163.72 8591.09 8672.73 9880.90 10106.85 9881.97 -8002.29 5798.00 6,44 5951010.76 13861.99 56.57 163.70 8613.70 8695.34 9913.51 10141.29 9914.42 -8035.35 5807.66 0,73 5950977.85 Blind (Inc Only) 13918.59 57.40 165.22 8644.54 8726.18 9958.23 10188.75 9958.94 -8081.07 5820.37 2.69 5950932.33 Blind (Inc Only) 13936.50 57.33 165.67 8654.19 8735.83 9972.36 10203.84 9973.00 •8095.67 5824.16 2.15 5950917.79 MWD+IFR+MS 13970.08 57.58 165.70 8672.26 8753.90 9998.82 10232.14 9999.36 -8123.10 5831.16 0.75 5950890.47 14002.56 53.71 167.55 8690.59 8772.23 10023.73 10258.95 10024.17 -8149.18 5837.37 12,81 5950864.49 14035.35 50.04 169.33 8710.83 8792.47 10047.38 10284.74 10047.73 -8174.44 5842.55 11.98 5950839.31 14065.82 49.27 169.42 8730.55 8812.19 10068.52 10307.96 10068.79 -8197.27 5846.83 2.54 5950816.55 14097.73 49.40 169.73 8751.35 8832.99 10090.52 10332.17 10090.72 -8221.07 5851.21 0.84 5950792.82 14129.57 50.16 170.25 8771.91 8853.55 10112.54 10356.48 10112.68 -8245.01 5855.43 2.69 5950768.95 617297.43 N 70 16 51.300 W 149 3 3.142 617339.63 N 70 16 50.558 W 149 3 1.948 617381.00 N 70 16 49.816 W 149 3 0.777 617421.24 N 70 16 49.075 W 149 2 59.639 617460.24 N 70 16 48.337 W 149 2 58.537 617497.78 N 70 16 47.600 W 149 2 57.477 617533.54 N 70 16 46.863 W 149 2 56.470 617567.74 N 70 16 46.122 W 149 2 55.508 617601.04 N 70 16 45.379 W 149 2 54.572 617633.42 N 70 16 44.636 W 149 2 53.663 617664.95 N 70 i 6 43.896 W 149 2 617696.11 N 70 16 43.163 W 149 2 5 617726.98 N 70 16 42.435 W 149 2 51.040 617757.78 N 70 16 41.708 W 149 2 50.176 617757.78 N 70 i 6 41.708 W 149 2 50.176 617775.60 N 70 16 41.283 W 149 2 49.677 617780.87 N 70 16 41.157 W i 49 2 49.529 617791.12 N 70 16 40.901 W 149 2 49.243 617816.16 N 70 16 40.130 W 149 2 48.549 617832.15 N 70 16 39.320 W 149 2 48.121 617841.95 N 70 16 38.513 W 149 2 47.873 617850.80 N 70 16 37.722 W 149 2 47.652 617858.55 N 70 16 36.981 W 149 2 47.461 617865.73 N 70 16 36.219 W 149 2 47.287 617873.77 N 70 16 35.462 W 149 2 47.088 617884.67 N 70 16 34.716 W 149 2 46.805 617895.51 N 70 16 33.956 W 149 2 46.524 617904.95 N 70 16 33.227 W 149 2 46.283 617915.28 N 70 16 32.483 W 149 7 617925.24 N 70 16 31.748 W 149 2 1 617934.99 N 70 16 31.012 W 149 2 45.511 617946.70 N 70 16 30.249 W 149 2 45.205 617965.12 N 70 16 29.496 W 149 2 44.704 617975.27 N 70 16 29.170 W 149 2 44.424 617988.66 N 70 16 28.721 W 149 2 44.054 617992.67 N 70 16 28.577 W 149 2 43.944 618000.07 N 70 16 28.307 W 149 2 43.741 618006.67 N 70 16 28.051 W 149 2 43.561 618012.22 N 70 16 27.802 W 149 2 43.411 618016.85 N 70 16 27.578 W 149 2 43.287 618021.58 N 70 16 27.344 W 149 2 43.160 618026.16 N 70 16 27.108 W 149 2 43.037 SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A Generated 1/16!2006 3:23 PM Page 4 of 9 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea TVD ND Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft (de de (ft ft ft ft ft ft ft de 100 ft ftUS ftUS 141b1.55 5l.yfi 1/'L.SU 25/yG.UI 1525/3.b5 lUl;i4.231 1U3251.;i5 lUl:i4.t5y -25Lby.tiU 5k55y.1E7 /.255 5y5U/44.4"L 14193.07 54.46 175.56 8810.88 8892.52 10156.85 10406.59 10156.89 -8294.70 5861.77 11.11 5950719.36 14224.09 56.89 175.73 8828.37 8910.01 10178.87 10432.21 10178.88 -8320.25 5863.72 7.85 5950693.85 14235.83 57.34 176.01 8834.75 8916.39 10187.32 10442.07 10187.33 -8330.08 5864.43 4.32 5950684.03 14254.82 58.65 174.77 8844.81 8926.45 10201.20 10458.17 10201.20 -8346.13 5865.72 8.85 5950668.00 14286.64 61.13 175.93 8860.78 8942.42 10224.93 10485.69 10224.94 -8373.56 5867.95 8.41 5950640.61 14318.85 66.81 174.95 8874.91 8956.55 10249.86 10514.62 10249.89 -8402.40 5870.25 17.84 5950611.81 14348.90 72.89 172.52 8885.25 8966.89 10274.57 10542.82 10274.64 -8430.43 5873.34 21.61 5950583.84 14381.10 78.58 171.92 8893.18 8974.82 10302.29 10574.01 10302.42 -8461.33 5877.57 17.76 5950553.00 14413.27 79.59 171.75 8899.28 8980.92 10330.45 10605.60 10330.67 -8492.60 5882.05 3.18 5950521.81 14442.93 80.19 171.70 8904.48 8986.12 10356.52 10634.80 10356.83 -8521.49 5886.26 2.03 5950492.98 14476.24 82.33 168.57 8909.54 8991.18 10386.30 10667.72 10386.73 -8553.92 5891.90 11.29 5950460.64 14506.32 86.43 162.18 8912.49 8994.13 10414.33 10697.65 10414.86 -8582.87 5899.46 25.15 5950431.82 14538.35 88.87 157.12 8913.81 8995.45 10445.27 10729.65 10445.88 -8612.86 5910.58 17.53 5950401.99 14570.33 89.28 157.05 8914.32 8995.96 10476.52 10761.63 10477.21 -8642.31 5923.03 1.30 5950372.73 14600.79 89.18 156.79 8914.73 8996.37 10506.32 10792.08 10507.07 -8670.33 5934.97 0.91 5950344.90 14632.47 92.85 154.41 8914.17 8995.81 10537.43 10823.75 10538.26 -8699.17 5948.05 13.81 5950316.26 14668.26 94.19 152.19 8911.97 8993.61 10572.77 10859.48 10573.66 -8731.08 5964.10 7.24 5950284.59 14700.31 94.53 152.84 8909.54 8991.18 10604.45 10891.43 10605.39 -8759.43 5978.85 2.28 5950256.47 14729.35 94.98 153.01 8907.13 8988.77 10633.11 10920.37 10634.10 -8785.20 5992.02 1.66 5950230.90 14763.37 95.46 150.83 8904.03 8985.67 10666.73 10954.25 10667.78 -8815.09 6007.97 6.54 5950201.26 14796.71 95.91 152.27 8900.73 8982.37 10699.68 10987.43 10700.78 -8844.26 6023.78 4.50 5950172.33 14825.15 96.60 152.19 8897.63 8979.27 10727.72 11015.70 10728.87 -8869.27 6036.95 2.44 5950147.52 14858.97 96.77 152.42 8893.70 8975.34 10761.04 11049.29 10762.25 -8899.01 6052.56 0.84 5950118.01 14891.44 96.94 152.18 8889.82 8971.46 10793.01 11081.53 10794.28 -8927.56 6067.54 0.90 5950089.70 14920.26 93.12 150.35 8887.29 8968.93 10821.53 11110.23 10822.85 -8952.73 6081.34 14.69 5950064.74 14950.76 92.85 150.68 8885.71 8967.35 10851.85 11140.69 10853.20 -8979.24 6096.34 1.40 5950038.46 14983.10 93.50 149.35 8883.91 8965.55 10884.01 11172.98 10885.41 -9007.21 6112.47 4.57 5950010.74 15013.53 93.40 148.44 8882.08 8963.72 10914.31 11203.35 10915.74 -9033.21 6128.16 3.00 5949984.97 15045.42 93.36 150.48 8880.20 8961.84 10946.04 11235.19 10947.51 -9060.63 6144.34 6.39 5949957.80 15076.47 93.67 149.95 8878.30 8959.94 10976.90 11266.18 10978.41 -9087.53 6159.73 1.97 5949931.13 15107.65 96.29 149.06 8875.59 8957.23 11007.86 11297.24 11009.41 -9114.29 6175.50 8.87 5949904.61 15140.02 96.53 148.77 8871.98 8953.62 11039.95 11329.41 11041.53 -9141.84 6192.10 1.16 5949877.32 15172.19 97.25 147.00 8868.12 8949.76 11071.85 11361.34 11073.45 -9168.89 6209.08 5.90 5949850.53 15203.57 97.33 148.57 8864.14 8945.78 11102.93 11392.47 11104.56 -9195.22 6225.67 4.97 5949824.44 15222.32 97.41 147.38 8861.73 8943.37 11121.50 11411.07 11123.14 -9210.99 6235.54 6.31 5949808.83 15254.33 95.96 148.68 8858.01 8939.65 11153.24 11442.86 11154.91 -9237.96 6252.37 6.07 5949782.12 15284.33 96.06 148.95 8854.86 8936.50 11183.01 11472.69 11184.70 -9263.48 6267.82 0.96 5949756.83 15316.52 96.24 148.29 8851.42 8933.06 11214.95 11504.70 11216.67 -9290.80 6284.48 2.11 5949729.76 15348.72 95.96 148.68 8847.99 8929.63 11246.90 11536.71 11248.66 -9318.10 6301.22 1.49 5949702.72 15379.20. 96.03 150.47 8844.81 8926.45 11277.12 11567.03 11278.91 -9344.24 6316.57 5.85 5949676.81 15411.21 95.62 152.43 8841.56 8923.20 11308.75 11598.87 11310.61 -9372.21 6331.79 6.22 5949649.08 15443.69 94.20 153.01 8838.78 8920.42 11340.81 11631.23 11342.74 -9400.97 6346.62 4.72 5949620.54 b125U:iU.L5 N /U 117 Gt7.i527ti W 74y "L 4"G.yLy 618033.24 N 70 16 26.619 W 149 2 42.854 618035.56 N 70 16 26.368 W 149 2 42.798 618036.42 N 70 16 26.271 W 149 2 42.777 618037.95 N 70 16 26.114 W 149 2 42.740 618040.59 N 70 16 25.844 W 149 2 42.676 618043.33 N 70 16 25.560 W 149 2 42.609 618046.83 N 70 16 25.284 W 149 2 42.520 618051.52 N 70 16 24.980 W 149 2 42.398 618056.47 N 70 16 24.673 W 149 2 42.268 618061.10 N 70 16 24.389 W 149 2 618067.22 N 70 16 24.070 W 149 2 618075.21 N 70 16 23.785 W 149 2 4 . 618086.78 N 70 16 23.490 W 149 2 41.440 618099.67 N 70 16 23.200 W 149 2 41.078 618112.03 N 70 16 22.924 W 149 2 40.731 618125.53 N 70 16 22.641 W 149 2 40.351 618142.06 N 70 16 22.327 W 149 2 39.884 618157.22 618170.78 618187.17 618203.40 618216.94 618233.00 618248.40 618262.58 618277.96 618294.51 N 70 16 22.048 N 70 16 21.794 N 70 16 21.500 N 70 16 21.213 N 7016 20.967 N 70 16 20.674 N 70 16 20.394 N 70 16 20.146 N 70 16 19.885 N 70 16 19.610 W 149 2 39.455 W 149 2 39.073 W 149 2 38.609 W 149 2 38.150 W 149 2 37.767 W 149 2 37.313 W 149 2 36.877 W 149 2 36.476 W 149 2 36.040 W 149 2 35.571 618310.59 618327.17 618342.96 618359.12 618376.13 618393.51 618410.49 618420.59 618437.82 618453.64 618470.71 618487.85 618503.59 618519.22 618534.48 N 70 16 19.354 N 70 16 19.084 N 70 16 18.820 N 70 16 18.556 N 70 16 18.285 N 70 16 18.019 N 70 16 17.760 N 70 16 17.605 N 70 16 17.339 N 70 16 17.088 N 70 16 16.819 N 70 16 16.551 N 70 16 16.294 N 70 16 16.018 N 70 16 15.735 W 149 2~5 W 149 2 5 W 149 2 34.197 W 149 2 33.739 W 149 2 33.256 W 149 2 32.762 W 149 2 32.280 W 149 2 31.993 W 149 2 31.504 W 149 2 31.055 W 149 2 30.570 W 149 2 30.084 W 149 2 29.637 W 149 2 29.195 W 149 2 28.764 SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A Generated il16l2006 3:23 PM Page 5 of 9 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft) de (de ft ft tt ft ft (ft ft de /100 ft ftUS ftUS 15472 .08 92.52 153.13 8837.12 8918.76 11368.87 11659.57 11370.87 -9426.24 6359.45 5.93 5949595.47 618547.69 N 70 16 15.487 W 149 2 28.391 15505 .35 90.91 155.23 8836.12 8917.76 11401.69 11692.83 11403.78 -9456.17 6373.94 7.95 5949565.76 618562.62 N 70 16 15.192 W 149 2 27.970 15537 .80 89.47 155.00 8836.01 8917.65 11433.62 11725.28 11435.82 -9485.60 6387.59 4.49 5949536.53 618576.71 N 70 16 14.903 W 149 2 27.573 15569 .80 87.34 155.88 8836.91 8918.55 11465.07 11757.26 11467.38 -9514.70 6400.89 7.20 5949507.65 618590.43 N 70 16 14.616 W 149 2 27.187 15600 .88 86.55 158.15 8838.56 8920.20 11495.41 11788.30 11497.85 -9543.27 6413.00 7.72 5949479.26 618602.97 N 70 16 14.335 W 149 2 26.835 15633 .17 86.45 159.70 8840.53 8922.17 11526.69 11820.53 11529.28 -9573.34 6424.59 4.80 5949449.37 618615.01 N 70 16 14.040 W 149 2 26.498 15664 .49 85.24 161.01 8842.80 8924.44 11556.80 11851.76 11559.56 -9602.76 6435.09 5.69 5949420.1 i 618625.95 N 70 16 13.750 W 149 2 26.193 15695 .86 83.66 163.82 8845.84 8927.48 11586.57 11882.99 11589.53 -9632.52 6444.53 10.24 5949390.50 618635.82 N 70 16 13.457 W 149 2 25.919 15726 .64 82.72 165.86 8849:49 8931.13 11615.30 11913.55 11618.50 -9662.01 6452.52 7.25 5949361.13 618644.25 N 70 16 13.167 W 149 2 25.687 15759 .86 82.21 167.28 8853.84 8935.48 11645.91 11946.48 11649.39 -9694.05 6460.17 4.51 5949329.22 618652.38 N 70 16 12.852 W 149 2 25.466 15790 .95 80.58 169.05 8858.50 8940.14 11674.15 11977.22 11677.93 -9724.13 6466.47 7.69 5949299.23 618659.13 N 70 16 12.556 W 149 2 15822 .64 79.57 169.74 8863.96 8945.60 11702.57 12008.44 11706.66 -9754.81 6472.22 3.84 5949268.64 618665.33 N 70 16 12.254 W 149 2 2 15854 .88 79.53 169.87 8869.81 8951.45 11731.33 12040.14 11735.77 -9786.02 6477.83 0.42 5949237.53 618671.41 N 70 16 11.947 W 149 2 24.954 15886 .49 79.42 169.32 8875.58 8957.22 11759.57 12071.22 11764.37 -9816:58 6483.44 1.75 5949207.05 618677.47 N 70 16 11.647 W 149 2 24.791 15917 .83 79.39 169.24 8881.34 8962.98 11787.63 12102.02 11792.79 -9846.85 6489.17 0.27 5949176.87 618683.65 N 70 16 11.349 W 149 2 24.625 15949 .29 79.67 169.76 8887.06 8968.70 11815.76 12132.96 11821.30 -9877.27 6494.81 1.85 5949146.55 618689.74 N 70 16 11.050 W 149 2 24.462 15981 .56 79.92 169.71 8892.78 8974.42 11844.59 12164.72 11850.52 -9908.52 6500.47 0.79 5949115.39 618695.87 N 70 16 10.742 W 149 2 24.298 16014 .10 80.16 169.27 8898.40 8980.04 11873.74 12196.77 11880.08 -9940.03 6506.32 1.52 5949083.97 618702.18 N 70 16 10.432 W 149 2 24.128 16044 .68 80.16 170.01 8903.63 8985.27 11901.11 12226.90 11907.86 -9969.67 6511.74 2.38 5949054.41 618708.04 N 70 16 10.141 W 149 2 23.971 16076 .96 80.37 169.59 8909.09 8990.73 11929.97 12258.72 11937.16 -10000.98 6517.37 1.44 5949023.19 618714.14 N 70 16 9.833 W 149 2 23.808 16108 .38 50.51 169.35 8914.31 8995.95 11958.15 12289.70 11965.78 -10031.45 6523.03 0.88 5948992.82 618720.26 N 70 16 9.533 W 149 2 23.644 16139 .55 80.71 169.18 8919.39 9001.03 11986.17 12320.45 11994.24 -10061.66 6528.76 0.84 5948962.70 618726.43 N 70 16 9.236 W 149 2 23.478 16171 .94 80.82 169.55 8924.59 9006.23 12015.27 12352.42 12023.81 -10093.08 6534.66 i .18 5948931.37 618732.80 N 70 16 8.927 W 149 2 23.307 16203 .63 80.79 169.42 8929.65 9011.29 12043.72 12383.70 12052.74 -10123.84 6540.37 0.42 5948900.71 618738.97 N 70 16 8.624 W 149 2 23.142 16234 .63 80.82 169.76 8934.61 9016.25 12071.53 12414.31 12081.03 -10153.94 6545.90 1.09 5948870.70 618744.95 N 70 16 8.328 W 149 2 22.982 16266 .73 81.68 168.94 8939.49 9021.13 12100.42 12446.03 12110.41 -10185.11 6551.76 3.68 5948839.61 618751.27 N 70 16 8.022 W 149 2 22.812 16299 .23 83.31 168.49 8943.74 9025.38 12129.90 12478.25 12140.41 -10216.71 6558.07 5.20 5948808.11 618758.05 N 70 16 7.711 W 149 2 22.629 16330 .02 83.62 168.59 8947.24 9028.88 12157.93 12508.84 12168.92 -10246.69 6564.14 1.06 5948778.23 618764.57 N 70 16 7.416 W 149 2 22.453 16361 .47 85.59 166.97 8950.20 9031.84 12186.78 12540.15 12198.27 -10277.29 6570.77 8.10 5948747.74 618771.65 N 70 16 7.115 W 149 ~1 16393 .60 86.34 166.64 8952.46 9034.10 12216.52 12572.20 12228.50 -10308.49 6578.09 2.55 5948716.65 618779.43 N 70 16 6.808 W 149 8 16425 .92 87.48 166.58 8954.20 9035.84 12246.50 12604.47 12258.99 -10339.89 6585.56 3.53 5948685.37 618787.37 N 70 16 6.499 W 149 2 21.832 16456 .60 89.36 166.04 8955.05 9036.69 12275.06 12635.14 12288.03 -10369.69 6592.82 6.38 5948655.69 618795.07 N 70 16 6.206 W 149 2 21.621 16488 .66 90.70 166.11 8955.03 9036.67 12304.96 12667.20 12318.43 -10400.80 6600.53 4.19 5948624.69 618803.25 N 70 16 5.900 W 149 2 21.397 16521 .06 91.11 166.74 8954,52 9036.16 12335.10 12699.60 12349.10 -10432.29 6608.14 2.32 5948593.32 618811.32 N 70 16 5.590 W 149 2 21.177 16551 .80 91.28 165.65 8953,88 9035.52 12363.74 12730.33 12378.24 -10462.14 6615.47 3.59 5948563.59 618819.10 N 70 16 5.297 W 149 2 20.964 16582 .56 91.80 164.64 8953.05 9034.69 12392.59 12761.08 12407.58 -10491.86 6623.36 3.69 5948533.99 618827.42 N 70 16 5.004 W 149 2 20.736 16615 .02 92.76 165.70 8951.76 9033.40 12423.02 12793.51 12438.52 -10523.21 6631.66 4.40 5948502.77 618836.19 N 70 16 4.696 W 149 2 20.495 16646 .22 92.18 164.17 8950.41 9032.05 12452.31 12824.68 12468.31 -10553.31 6639.76 5.24 5948472.80 618844.74 N 70 16 4.400 W 149 2 20.260 16678 .11 91.59 161.97 8949,36 9031.00 12482.59 12856.56 12499.06 -10583.80 6649.04 7.14 5948442.45 618854.47 N 70 16 4.100 W 149 2 19.990 16710 .17 92.79 160.92 8948.14 9029.78 12513.30 12888.59 12530.20 -10614.17 6659.23 4.97 5948412.24 618865.12 N 70 16 3.801 W 149 2 19.694 16741 .44 93.24 160.59 8946.49 9028.13 12543.34 12919.82 12560.65 -10643.65 6669.53 1.78 5948382.92 618875.85 N 70 16 3.511 W 149 2 19.396 16772 .04 93.55 160.42 8944.68 9026.32 12572.77 12950.36 12590.46 -10672.45 6679.72 1.15 5948354.28 618886.47 N 70 16 3.228 W 149 2 19.100 SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A Generated 1/16/2006 3:23 PM Page 6 of 9 Comments Measured Inclination Azimuth Sub-Sea TVD ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft (de ) de ft) ft ft ft ft (ft ft de 100 ft ftUS ftUS ) 1b25U4.:i(i y:i.25:i 15y.yy i5y4L.tiU yUL4.'L4 1LtiU:~.2525 1LyiSL.bL 1LbLl.ytl -1V/VL./y btiyU.b4 1.5y 5y425;iL4,lU ti12525y/.254 16835.62 92.93 160.40 8940.76 9022.40 12633.98 13013.82 12652.49 -10732.15 6701.22 3.16 5948294.91 618908.85 16867.82 91.08 160.96 8939.63 9021.27 12664.95 13046.00 12683.88 -10762.52 6711.86 6.00 5948264.71 618919.95 16899. 91 90.39 161 .71 8939.22 9020.86 12695.73 13078. 09 12715.12 -10792.92 6722.13 16930. 94 90.67 163 .48 8938 .93 9020.57 12725.29 13109. 12 12745.16 -10822.53 6731.41 16962. 41 90.53 164 .63 8938 .60 9020.24 12755.02 13140. 59 12775.42 -10852.78 6740.06 16993. 77 90.91 164 .95 8938 .21 9019.85 12784.51 13171. 94 12805.47 -10883.04 6748.28 17024. 53 91.32 166 .35 8937 .61 9019.25 12813.28 13202. 70 12834.81 -10912.84 6755.91 17057. 02 90.74 168 .39 8937 .03 9018.67 12843.30 13235. 18 12865.50 -10944.53 6763.01 17089. 40 92.28 170 .29 8936 .17 9017.81 12872.77 13267. 55 12895.71 -10976.34 6768.99 17120. 53 92.14 171 .42 8934 .97 9016.61 12900.74 13298. 66 12924.45 -11007.05 6773.94 17152. 50 91.63 172 .30 8933 .92 9015.56 12929.23 13330. 61 12953.77 -11038.68 6778.46 17183. 15 91.80 171 .49 8933 .01 9014.65 12956.53 13361. 25 12981.88 -11069.01 6782.78 17214. 80 92.18 170. 37 8931 .91 9013.55 12984.96 13392. 88 13011.12 -11100.25 6787.77 17245. 73 89.81 169. 28 8931. 37 9013.01 13013.00 13423. 80 13039.94 -11130.68 6793.23 17278. 55 88.16 170 .34 8931 .95 9013.59 13042.77 13456. 61 13070.54 -11162.98 6799.04 17310. 60 87.75 170 .67 8933 .09 9014.73 13071.66 13488. 64 13100.27 -11194.57 6804.32 17343. 12 87.07 171 .12 8934 .56 9016.20 13100.86 13521. 13 13130.36 -11226.65 6809.46 3.18 5948234.47 618930.67 5 .77 5948205.00 618940.39 3 .68 5948174.88 618949.48 1 .58 5948144.75 618958.16 4 .74 5948115.08 618966.22 6.53 5948083.49 7.55 5948051.78 3.66 5948021.15 3.18 5947989.59 2.70 5947959.33 3.73 5947928.18 8.43 5947897.83 5.98 5947865.63 1.64 5947834.12 2.51 5947802.13 618973.80 618980.26 618985.66 618990.65 618995.42 619000.87 619006.79 619013.08 619018.83 619024.45 IV /U ltl Z.`JLy W 14yL 125./25Z N 70 16 2.640 W 149 2 18.475 N 70 16 2.342 W 149 2 18.166 N 70 16 2.042 W 149 2 17.868 N 70 i 6 1.751 W 149 2 17.599 N 70 16 1.454 W 149 2 17.348 N 70 16 1.156 W 149 2 17.109 N 70 i 6 0.863 W 149 2 16.888 N 70 16 0.551 N 70 16 0.238 N 70 15 59.936 N 70 15 59.625 N 70 15 59.327 N 70 15 59.019 N 70 i 5 58.720 N 70 15 58.402 N 70 15 58.092 N 70 15 57.776 W 149 2 16.682 W 149 2 16.509 W 14921 W 14921 W 14921 W 149 2 15.966 W 149 2 15.808 W 149 2 15.639 W 149 2 15.487 W 149 2 15.338 17373.49 87.10 170.19 8936.11 9017.75 13128.18 13551.46 13158.51 -11256.57 6814.39 3.06 5947772 .28 17404.79 86. 93 169. 76 8937.74 9019.38 13156.50 13582.72 13187.66 -11287.36 6819.83 1.48 5947741 .59 17436.74 87. 58 170. 96 8939.27 9020.91 13185.32 13614.63 13217.36 -11318.82 6825.17 4.27 5947710 .21 17467.53 89. 64 170. 51 8940.01 9021.65 13213.03 13645.41 13245.94 -11349.19 6830.13 6.85 5947679 .91 17500.34 89. 74 171. 27 8940.19 9021.83 13242.52 13678.22 13276.38 -11381.59 6835.32 2.34 5947647 .60 17529.84 89. 60 171 .29 8940.36 9022.00 13268.95 13707.72 13303.68 -11410.75 6839.79 0.48 5947618 .51 17562.49 89. 47 169 .67 8940.63 9022.27 13298.41 13740.37 13334.08 -11442.95 6845.19 4.98 5947586 .40 17594.14 89. 78 170 .66 8940.83 9022.47 13327.03 13772.02 13363.62 -11474.13 6850.60 3.28 5947555 .31 17626.61 90. 22 171 .50 8940.83 9022.47 13356.18 13804.49 13393.75 -11506.21 6855.63 2.92 5947523 .31 17656.78 90. 63 170. 31 8940.61 9022.25 13383.30 13834.66 13421.79 -11536.00 6860.40 4.17 5947493 .60 17689.61 90. 36 170. 33 8940.33 9021.97 13412.95 13867.48 13452.43 -11568.36 6865.92 0.82 5947461 .33 17720.84 90. 26 170. 07 8940.16 9021.80 13441.19 13898.71 13481.61 -11599.13 6871.24 0.89 5947430 .64 17753.12 90. 05 170 .12 8940.07 9021.71 13470.40 13930.99 13511.80 -11630.93 6876.79 0.67 5947398 .93 17783.29 90. 39 169 .26 8939.95 9021.59 13497.80 13961.16 13540.10 -11660.61 6882.19 3.07 5947369 .33 17815.69 90. 67 169 .36 8939.66 9021.30 13527.30 13993.56 13570.58 -11692.45 6888.20 0.92 5947337 .59 17848.16 91. 04 168 .98 8939.17 9020.81 13556.91 14026.03 13601.16 -11724.34 6894.30 1.63 5947305 .80 17878.68 91. 52 168 .27 8938.49 9020.13 13584.84 14056.54 13630.00 -11754.25 6900.32 2.81 5947275 .98 17909.61 91. 66 168 .56 8937.63 9019.27 13613.20 14087.46 13659.26 -11784.54 6906.53 1.04 5947245 .79 17941.78 90. 53 167 .93 8937.02 9018.66 13642.73 14119.62 13689.75 -11816.03 6913.08 4.02 5947214 .41 17972.70 89. 81 168. 19 8936.92 9018.56 13671.16 14150.54 13719.09 -11846.28 6919.48 2.48 5947184 .26 18004.89 89. 57 170 .14 8937.10 9018.74 13700.51 14182.73 13749.45 -11877.89 6925.53 6.10 5947152 .74 18036.44 89. 95 169 .78 8937.23 9018.87 13729.10 14214.28 13779.06 -11908.96 6931.03 1.66 5947121 .76 18067.10 90. 39 171 .48 8937.14 9018.78 13756.72 14244.94 13807.72 -11939.21 6936.02 5.73 5947091 .59 18099.26 90. 63 171 .50 8936.85 9018.49 13785.48 14277.10 13837.61 -11971.01 6940.78 0.75 5947059 .87 18131.11 90 .77 171. 73 8936.46 9018.10 13813.94 14308.95 13867.20 -12002.52 6945.42 0.85 5947028 .44 619029.82 N 70 15 57.482 W 149 2 15.195 619035.72 N 70 15 57.179 W 149 2 15.038 619041.53 N 70 15 56.869 W 149 2 14.883 619046.94 N 70 15 56.571 W 149 2 14.739 619052.61 N 7015 56.252 W 149 214.589 619057.52 N 70 15 55.965 W 149 2 14.460 619063.40 N 70 15 55.648 W 149 2 14.303 619069.27 N 70 15 55.342 W 149 2 14.147 619074.78 N 70 15 55.026 W 149 2 14.001 619079.99 N 70 15 54.733 W 149 2 13.863 619085.99 619091.76 619097.79 619103.63 619110.11 619116.69 619123.15 619129.81 619136.83 619143.68 619150.20 619156.16 619161.60 619166.83 619171.95 N 70 15 54.415 N 7015 54.112 N 70 15 53.799 N 70 15 53.507 N 70 15 53.194 N 70 15 52.881 N 70 15 52.586 N 70 15 52.288 N 70 15 51.979 N 7015 51.681 N 70 15 51.370 N 70 15 51.064 N 70 15 50.767 N 70 15 50.454 N 70 15 50.144 W 149 2 3 W 149 2 0 W 149 2 13.389 W 149 2 13.232 W 149 2 13.058 W 149 2 12.882 W 149 2 12.707 W 149 2 12.527 W 149 2 12.338 W 149 2 i 2.152 W 149 2 11.977 W 149211.818 W 149 2 11.673 W 149 2 11.536 W 149 2 11.401 SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A Generated 1/16/2006 3:23 PM Page 7 of 9 Comments Measured Inclination Azimuth Sub-Sea ND gyp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 18161.81 90.26 173.41 8936.19 9017.83 13841.13 14339.65 13895.54 -12032.96 6949.39 5.72 5946998.06 619176.37 N 70 15 49.845 W 149 2 11.287 18193.96 88.88 175.17 8936.43 9018.07 13869.14 14371.79 13924.85 -12064.95 6952.59 6.96 5946966.13 619180.04 N 70 15 49.530 W 149 2 11.194 18225.95 88.06 175.47 8937.28 9018.92 13896.73 14403.77 13953.77 -12096.82 6955.20 2.73 5946934.30 619183.13 N 70 15 49.217 W 149 2 11.119 18256.51 88.40 174.36 8938.23 9019.87 13923.18 14434.32 13981.51 -12127.24 6957.91 3.80 5946903.92 619186.29 N 70 15 48.917 W 149 2 11.041 18288.99 88.47 173.82 8939.11 9020.75 13951.53 14466.79 14011.19 -12159.54 6961.25 1.68 5946871.68 619190.11 N 70 15 48.600 W 149 2 10.945 18320.32 90.26 173.45 8939.46 9021.10 13979.00 14498.11 14039.94 -12190.67 6964.72 5.83 5946840 .61 619194.05 N 70 15 48.294 W 149 2 10.845 18351.72 92.21 172.37 8938.79 9020.43 14006.72 14529.50 14068.91 -12221.82 6968.60 7.10 5946809 .52 619198.39 N 70 15 47.987 W 149 2 10.733 18383.08 92.76 172.42 8937.43 9019.07 14034.52 14560.83 14097.95 -12252.88 6972.74 1.76 5946778 .53 619203.00 N 70 15 47.682 W 149 2 10.613 18415.62 92.18 174.28 8936.02 9017.66 14063.11 14593.34 14127.88 -12285.17 6976.51 5.98 5946746 .31 619207.24 N 70 15 47.364 W 149 2 10.504 18446.45 91.56 175.17 8935.02 9016.66 14089.84 14624.16 14155.97 -12315.85 6979.34 3.52 5946715 .67 619210.53 N 70 15 47.062 W 149 2 10.423 18478.59 91.46 174.15 8934.17 9015.81 14117.74 14656.29 14185.28 -12347.84 6982.33 3.19 5946683 .74 619214.00 N 70 15 46.748 W 149 2 18509.09 91.46 174.71 8933.39 9015.03 14144.28 14686.78 14213.15 -12378.18 6985.29 1.84 5946653. 44 619217.41 N 70 15 46.449 W 149 2 1 18541.19 91.46 173.54 8932.57 9014.21 14172.29 14718.87 14242.57 -12410.11 6988.57 3.64 5946621 .57 619221.17 N 70 15 46.135 W 149 2 10.157 18573.35 91.97 175.39 8931.61 9013.25 14200.25 14751.01 14271.98 -12442.10 6991.68 5.96 5946589 .63 619224.74 N 70 15 45.820 W 149 2 10.067 18604.52 92.01 175.51 8930.53 9012.17 14227.08 14782.16 14300.27 -12473.15 6994:15 0.41 5946558 .62 619227.68 N 70 15 45.515 W 149 2 9.996 18635.13 91.90 173.27 8929.49 9011.13 14253.71 14812.76 14328.29 -12503.60 6997.14 7.32 5946528 .23 619231.12 N 70 15 45.216 W 149 2 9.910 18667.24 91.56 176.36 8928.52 9010.16 14281.54 14844.85 14357.60 -12535.56 7000.04 9.68 5946496 .32 619234.50 N 70 15 44.901 W 149 2 9.826 18698.04 91.11 175.03 8927.80 9009.44 14307.99 14875.64 14385.54 -12566.26 7002.35 4.56 5946465. 66 619237.27 N 70 15 44.599 W 149 2 9.760 18729.57 91.52 174.06 8927.07 9008.71 14335.39 14907.16 14414.42 -12597.64 7005.34 3.34 5946434 .33 619240.73 N 70 15 44.291 W 149 2 9.674 18760.83 91.56 173.41 8926.23 9007.87 14362.77 14938.41 14443.22 -12628.70 7008.75 2.08 5946403 .32 619244.60 N 70 15 43.985 W 149 2 9.575 18792.32 90.12 173.19 8925.77 9007.41 14390.47 14969.90 14472.35 -12659.97 7012.43 4.63 5946372 .11 619248.74 N 70 15 43.678 W 149 2 9.469 18824.81 90.32 172.07 8925.65 9007.29 14419.24 15002.39 14502.56 -12692.19 7016.60 3.50 5946339. 96 619253.39 N 70 1 S 43.361 W 149 2 9.349 18856.09 90.50 172.02 8925.42 9007.06 14447.07 15033.67 14531.77 -12723.17 7020.92 0.60 5946309 .05 619258,18 N 70 15 43.056 W 149 2 9.224 18886.70 89.40 172.60 8925.45 9007.09 14474.25 15064.28 14560.32 -12753.50 7025.02 4.06 5946278. 79 619262.73 N 70 15 42.758 W 149 2 9.105 18917.63 89.23 172.32 8925.82 9007.46 14501.68 15095.20 14589.13 -12784.17 7029.08 1.06 5946248 .19 619267.24 N 70 15 42.456 W 149 2 8.988 18949.89 89.30 171.61 8926.23 9007.87 14530.41 15127.46 14619.30 -12816.11 7033.59 2.21 5946216 .33 619272.22 N 70 15 42.142 W 149 2 8.858 18981.35 91.04 170.43 8926.14 9007.78 14558.66 15158.92 14648.91 -12847.18 7038.50 6.68 5946185 .33 619277.60 N 70 15 41.836 W 149 2 8.716 19013.12 93.03 170.77 8925.01 9006.65 14587.27 15190.67 14678.87 -12878.50 7043.68 6.35 5946154 .09 619283.25 N 70 15 41.528 W 149 2 8.566 19044.64 93.27 171.15 8923.28 9004.92 14615.55 15222.14 14708.52 -12909.58 7048.63 1.42 5946123 .09 619288.66 N 70 15 41.222 W 14 2 19076.12 93.51 170.05 8921.42 9003.06 14643.87 15253.57 14738.19 -12940.58 7053.76 3.57 5946092 .17 619294,25 N 70 15 40.917 9 W 149 4 19107.20 93.62 170.30 8919.49 9001.13 14671.92 15284.59. 14767.56 -12971.15 7059.05 0.$8 5946061 .69 619300.00 N 70 15 40.617 W 149 2 8.121 19138.08 93.65 170.25 8917.53 8999.17 14699.77 15315.40 14796.74 -13001.52 7064.26 0.19 5946031 .40 619305.65 N 70 15 40.318 W 149 2 7.970 19170.06 93.24 170.57 8915.61 8997.25 14728.59 15347.33 14826.94 -13033.00 7069.58 1.63 5946000 .01 619311.44 N 70 15 40.008 W 149 2 7.816 19201.22 91.83 171.77 8914.23 8995.87 14756,50 15378.45 14856.26 -13063.76 7074.36 5.94 5945969 .33 619316.68 N 70 15 39.706 W 149 2 7.678 19232.94 91.52 172.44 8913.30 8994.94 14784.71 15410.16 14885.95 -13095.16 7078.71 2.33 5945937 .99 619321.50 N 70 15 39.397 W 149 2 7.552 19265.88 90.05 171.84 8912.85 8994.49 14814.00 15443.10 14916.80 -13127.79 7083.22 4.82 5945905 .44 619326.49 N 70 15 39.076 W 149 2 7.422 19297.00 88.20 172.53 8913.33 8994.97 14841.65 15474.21 14945.94 -13158.62 7087.45 6.34 5945874 .69 619331.18 N 70 15 38.773 W 149 2 7.300 19328.66 87.48 173.46 8914.52 8996.16 14869.57 15505,85 14975.42 -13190.02 7091.30 3.71 5945843 .35 619335.50 N 70 15 38.464 W 149 2 7.188 19360.34 87.03 173.44 8916.04 8997.68 14897.37 15537.49 15004.82 -13221.45 7094.91 1.42 5945811 .97 619339.58 N 70 15 38.155 W 149 2 7.084 19390.87 85.93 173.77 8917.91 8999.55 14924.10 15567,96 15033.11 -13251.74 7098.31 3.76 5945781 .75 619343.43 N 70 15 37.857 W 149 2 6.986 19423.10 86.00 174.32 8920.18 9001.82 14952.19 15600.11 15062.88 -13283.71 7101.64 1.72 5945749 .83 619347.24 N 70 15 37.542 W 149 2 6.890 19455.31 86.34 173.60 8922.33 9003.97 14980.28 15632.25 15092.66 -13315.67 7105.03 2.47 5945717 .92 619351.09 N 70 15 37.228 W 149 2 6.793 SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A Generated 1/16!2006 3:23 PM Page 8 of 9 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft) ft ft ft ft de 1100 ft ftUS ftUS 1y425b.:i:i i3b.:ii5 1/b .LU tSyL4.:iV yVVb .y4 1bUU/.L:i 1bbb:S.L1 lbl Ll.L/ -13J4b.4i5 /1U23.Vb 19518.24 86.41 175 .87 8926.31 9007 .95 15034.64 15695.06 15150.47 -13378.23 7110.53 19550.58 86.38 175 .45 8928.34 9009 .98 15062.38 15727.33 15180.04 -13410.42 7112.97 19581.77 86.24 175 .55 8930.35 9011 .99 15089.18 15758.46 15208.60 -13441.44 7115.41 19613.35 85.97 175 .01 8932.49 9014 .13 15116.36 15789.97 15237.57 -13472.84 7118.00 19644.77 85.86 175 .04 8934.73 9016 .37 15143.48 15821.31 15266.45 -13504.07 7120.72 19677.71 85.62 176 .09 8937.18 9018 .82 15171.74 15854.15 15296.61 -13536.82 7123.26 19709.45 85.55 176 .29 8939.62 9021 .26 15198.79 15885.80 15325.54 -13568.39 7125.36 19739.49 85.21 175 .50 8942.04 9023 .68 15224.46 15915.74 15352.98 -13598.26 7127.51 19770.79 85.24 175 .34 8944.65 9026 .29 15251.33 15946.93 15381.68 -13629.35 7130.00 19802.68 85.62 175 .47 8947.19 9028 .83 15278.73 15978.72 15410.94 -13661.04 7132.54 19834.39 86.72 173. 36 8949.31 9030. 95 15306.26 16010.36 15440.28 -13692.52 7135.62 19867.97 86.83 174. 41 8951.19 9032. 83 15335.60 16043.89 15471.50 -13725.86 7139.19 19899.40 87.06 172. 69 8952.87 9034. 51 15363.14 16075.27 15500.80 -13757.04 7142.72 19929.55 87.13 174. 06 8954.40 9036. 04 15389.62 16105.38 15528.95 -13786.95 7146.19 19961.35 86.65 172. 57 8956.12 9037. 76 15417.55 16137.14 15558.65 -13818.49 7149.89 19993.64 85.93 173. 05 8958.21 9039. 85 15446.03 16169.36 15588.90 -13850.46 7153.92 20025.25 85.72 174. 33 8960.51 9042. 15 15473.66 16200.89 15618.33 -13881.79 7157.39 LastMWD+IFR+MS 20056.89 84.73 175. 22 8963.15 9044. 79 15501.01 16232.42 15647.56 -13913.19 7160.26 TD (Projected) 20113.00 84.15 175. 22 8968.58 9050. 22 15549.22 16288.26 15699.19 -13968.84 7164.91 Survey Type: Definitive Survey NOTES: GCT MS - ( Schlumberger GCT multishot -- GCT surveys in casing or open hole. GCT = "Gyro Continuous Tool". ) MWD +IFR + MS - (In-field referenced MWD w ith mult-stati on analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enh ance inclination accuracy. ) Legal. Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 3948 FSL 1192 FEL S21 Ti 1 N R12E UM 5958925.03 612048.98 Tie-In : 3947 FSL 1193 FEL S21 Ti 1 N R12E UM 5958924.87 612048.72 BHL : 535 FSL 4619 FEL S 35 T11 N R12E UM 5945065.78 619420.71 5.15 by4bb23/.l / bl`J:Sb4.5/ IV /U 15 Jb.yLb VV 74y L b./Vb 2.10 5945655.46 619357.53 N 70 15 36.613 W 149 2 6.634 1.30 5945623.32 619360.45 N 70 15 36.296 W 149 2 6.564 0.55 5945592.33 619363.35 N 70 15 35.991 W 149 2 6.494 1.91 5945560.98 619366.41 N 70 15 35.682 W 149 2 6.419 0.36 5945529.80 619369.59 N 70 15 35.375 W 149 2 6.341 3.26 5945497.09 619372.62 N 70 15 35.053 W 149 2 6.268 0.67 5945465.56 619375.20 N 70 15 34.742 W 149 2 6.208 2.86 5945435.73 619377.78 N 70 15 34.448 W 149 2 6.146 0.52 5945404.68 619380.74 N 70 15 34.143 W 149 2 6.075 1.26 5945373.04 619383.76 N 70 15 33.831 W 149 7.49 5945341.60 619387.30 N 70 15 33.521 W 149 3.14 5945308.33 619391.37 N 70 15 33.193 W 149 2 5.51 5945277.20 619395.36 N 70 15 32.887 W 149 2 5.708 4.54 5945247.35 619399.28 N 70 15 32.593 W 149 2 5.608 4.92 5945215.87 619403.45 N 70 15 32.282 W 149 2 5.501 2.68 5945183.97 619407.96 N 70 15 31.968 W 149 2 5.385 4.09 5945152.70 619411.89 N 70 15 31.660 W 149 2 5.285 4.20 5945121.35 619415.23 N 70 15 31.351 W 149 2 5.202 1.03 5945065.78 619420.71 N 70 15 30.803 W 149 2 5.068 • SurveyEditor Ver SP 1.0 Bld( doc40x_56) W-07\W-07\W-07A\W-07A Generated 1/16/2006 3:23 PM Page 9 of 9 • ~® ^ T TREE = 4" CNV WELLHEAD = CNV ACTUATOR = OTIS KB. ELEV = 82.76' BF. ELEV = 54.26' KOP = __..... 900' Max Angle = Datum MD = Datum TVD = 8800' SS • 2,18$ 4 1i2"'X' landing nipple, ID= 3.813" 13 3/8", 72.0#, L-80, BTC 3,155 4 1/2" 12.6# 13Cr-80 Vam Top Tubing Tap of 7" 26# liner 12,179 12,358' 9 5/8" Window GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 3376 2844 49 MMG DMY RK 0 11/14/05 6 4072 3305 49 MMG DOME RK 16 12/03!45 5 6698 4735 59 MMG DMY RK 0 11(14/45 4 8988 5980 59 MMG SO RK 20 12103/05 3 11486 7341 56 MMG DMY RK 0 11114/05 2 12581 7965 63 KBG2 DMY BK 0 11/14/05 1 13484 8453 53 KBG2 DMY BK 0 11/14/05 12,102' HES "Symphony Plus" DHPG 13,675' 4 1/2" X Nipple (3.813" ID) 13,695' -~7" x 4 1/2" Baker S3 Packer 13,718' 4 112"' XN Nipple (3.725" ID) 13,744' 4 1!2" Hanger /liner top packer 13751' 4 112" WLEG Top of 7" liner 13,734 (~ 9 5/8^, 47.0#, 13,984 L-80, BTC ~ ~ 7", 26.0#, L-80, 14,770 IJ4S Liner 13,921' 7" 26# L-80 BTC-M {6.276" ID) 4 1/2" Landing Collar 20,034 4 1/2", 12.6#, 13Cr-80, 20,113 Hydril 521 Liner DATE REV BY COMMENTS DATE REV BY COMMENTS 03/21/89 ORiGWAL COMPLETION 12,03105 KDC/TLH GLV GO 02/08,`01 SIS-QAA CONVERTEDTOCANVAS 03!05!01 SIS-LG FINAL 08!26101 RN,~KAK CORRECTIONS 10!20/02 PP/KAK PERF CORRECTIONS 10/19/05 PGS Proposed completion VVp07 BP Exploration (Alaska} PRUDHOE BAY UNCf WELL: W-07A PERMIT No: API No: 50-029-21918-01 SEC21, T11N, R12E, 1333°SNL & 1103' WEL • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: AOGCC -Librarian Well No W-07A Date Dispatched: 8-Nov-05 Installation/Rig Nabors lES Dispatched By: Mauricio Perdomo LWD Log Deljvery V1.1,10-02-03 Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James H. Johnson Received By: BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) ~~ f ~(10~ 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojh~bp.com ~ $ y 3 ~ ~~ ~ ~~~ ° , ~; ~ FRANK H. MURKOWSKI, GOVERNOR i ~1-7~ Oiil ~ ~ ~; 333 W. 7r" AVENUE, SUITE 100 COI~TSL'`R~A7`IOAT COl~il-iISSIOIQ f ANCHORAGE, ALASKA 99501-3539 ;~ PHONE (907) 279-1433 FAX (907) 276-7542 Bill Isaacson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay W-07A BP Exploration (Alaska) Inc. Permit No: 205-083 Surface Location: 1332' FNL, 1192' FEL, SEC. 21, T11N, R12E, UM Bottomhole Location: 4901' FNL, 737' FWL, SEC. 35, T11N, R12E, UM Dear Mr. Isaacson: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission fitness any required test. Contact the Commission's petroleum field inspector at (907y659 60 (pager). DATED this- day of May, 2005 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. - V~Gl~- ~'~ ZS ~ Z~aS STATE OF ALASKA • `~`~~ ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL ``'~ ~`~' ~~ n_~ ~~~ ~ 20 AAC 25.005 '~ ~ ~ ~,;,~~. Comp sip 1a. Type of work ^ Drill ®Redrill ^ Re-Entry ib. Current Well Class ^ Exploratory ®Development Oil ^ Stratigraphic Test ^ Service ^Development Gas ^.,~u~iplpp~~one ^'SI~t,~~1~Yne 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 2S100302630-277 11. Well Name and Number: PBU W-07A ~ 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 20260 TVp 9060 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 1332' SNL 1192' WEL SEC T11N R12E 21 UM '~ 7. Property Designation: ADL 028264 Pool , , , . , , Top of Productive Horizon: 206' SNL, 5128' EWL, SEC. 34, T11N, R12E, UM 8. Land Use Permit: 13. Approximate Spud Date: August 10, 2005 / Total Depth: 4901' SNL, 737' EWL, SEC. 35, T11N, R12E, UM ~ 9. Acres in Property: 2560 14. Distance to Nearest Property: 8600' 4b. Location of Well (State Base Plane Coordinates): Surface: x- 612049 - 5958925 Zone- ASP4 10. KB Elevation Plan (Height above GL): 81.56 feet f5. Distance to Nearest Well Within Pool W-12A is 4680' away at 19165' 16. Deviated Wells: Kickoff Depth: 14355 feet Maximum Hole Angle: 98 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3500 Surface: 2620 ~" i8. Casing rogram: Size Specffications Setting Depth To Bottom uantlty o emenf ` c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-1/8" 4-1/2" 12.6# 13Cr80 VAM 6080' 14180' 8859' 20260' 9060' 31 cu ft Class'G' ~ 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND' Re-entry Operations) Total Depth MD (ft): 14770 Total Depth TVD (ft): 9260 Plugs (measured): None Effective Depth MD (ft): 14729 Effective Depth TVD (ft): 9231 Junk (measured): None Casin Len th Size Cement Volume MD TVD r C n or 110' 20" 110' 110' 3155' 13-3/8" 500 cu ft Coldset II 3155' 2695' In 13984' 9-5/8" 3035 cu ft Class'G' 13984' 8758' Pro n 1036' 7" 352 cu ft Class 'G' 13734' - 14770' 8624' - 9260' Perforation Depth MD (ft): 14330' - 14489' Perforation Depth TVD (ft): 8960' - 9065' 20. Attachments ®Filing Fee, $100 ^ BOP Sketch ^ Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dave Wesley, 564-5153 Printed Name Bill Isaacson Title Senior Drilling Engineer Prepared By Name/Number: Si nature ~' ~. Phone 564-5521 Date ~ Z~I OS Terrie Hubble, 564-4628 Commission Use Only Permit To Drill Number: API Number: 50- 029-21918-01-00 Permit Approval Date: S See cover letter for other requirements Conditions of Approval: Sample quired ~-] Yes ~No Mud Log Required ~ Yes y'R No Hydr en ulfide Measures 'Yes r No Directional Survey Required 'Yes '~=~ No Other: ~{' S U' ~~ ''' 3~p Q ~ Sdt a APPROVED BY ~~ A roved ~ THE COMMISSION Date Form 10-aofTTevised O6/2be~ ~..~ ~ ~6ubmit Id Duplicate • ~ Well Name: W-07A Planned Well Summary Horizontal Target Well W-07A Well Type Sidetrack Ivishak Z4 Producer Objective AFE Number: PBD 4P2375 Surface Northin Eastin Offsets TRS Location 5,958,925.03 612,048.98 1,332' FNL/ 1,192' FEL 11 N, 12 E, 21 API Number: 50-029-21918-01 Target Northin Eastin Offsets TRS Location 5,949,590.00 618,530.00 206' FNL / 152' FEL 11 N, 12 E, 34 Bottom Northin Eastin Offsets TRS Location 5,944,910.00 619,500.00 379' FSL / 737' FWL 11 N, 12 E, 35 Planned KOP: 14,355' and / 8,972' tvd Planned TD: 20,260' and / 9,060' tvd Ri Nabors 7ES 1 CBE: 53.06' RTE: 81.56' Directional Program A roved Well Ian: W 05 Exit oint: 14,343' and / 8,884' sstvd Maximum Hole Inclination: 98.0° from 14,590' to 15,310' in the planned 6 1/8" production section. Proximity Issues: There are no close approach issues. All surrounding wells pass major risk criteria. Survey Program: Standard MWD with tIFR /Cassandra. Nearest Well within ool: Well W-12A, with center-to-center distance of 4,680' at 19,165' md. Nearest Pro ert Line 8,600' to the nearest PBU rope line. W-07A Sidetrack Page 1 • • Logging Program Hole Section: Required Sensors /Service 6 1/8" production: Real time MWD Dir/GR/Res/AIM throughout the interval. Den/Neu, real time, throu hout first half of horizontal foota e, rimaril .Two sam le catchers. Cased Hole: USIT O en Hole: None tanned Mud Program Hole Section / o eration: Mill window in the 7" liner at -14,330' T e Densit Viscosit PV YP Tau 0 API FL H Flo-Pro 8.5 50 - 60 10 - 15 40+ 3 - 7 5 - 7 9.0 - 9.5 Hole Section / o eration: Drillin 6 1/8" reduction interval T e Densit Viscosit PV YP MBT API FL H Flo-Pro 8.5 8.6 45 - 55 8 - 12 25 - 30 <3 4 - 6 9.0 - 9.5 Casing /Tubing Program Hole Size Casing/Tubing Size Wt. , ~ Grade Connect~n Length Top and / tvd Bottom and / tvd 6 1/8" 4'/z" 12.6# 13Cr-80 VAM TOP HT 6,080' 14,180'/ 8,859' 20,260' / 9,060' Tubin 4'/i" 12.6# 13Cr-80 VAM TOP 14,180' Surface 14,180' / 8,859' Cementing Program Casin Strin 4 1/2", 12.6#, 13Cr-80, VAM TOP - HT solid reduction liner Lead slurry: none planned Slur Desi n Basis: ~ g Tail slurry: 5,930' of 4 1/2" X 6 1/8" annulus with 40% excess, plus 85' of 4 " " ' ' " " " 1/2 , 12.6# shoe track, plus 150 X 4'/z liner lap, plus 200 of 7 of 7 X 4 drill i e annulus. Pre-Flush 25bbls CW100 Fluids S n /V l S acer 40bbls MudPUSH at 9.6 eque ce ume: o Lead Slur None tanned Tail Slur 148.Obbl / 831 cf 69 sx Class `G', 15.8 .2 cflsk. .r Casing /Formation Integrity Testing Test Test Point Test Type Test pressure 9 5/8" casin X 7" liner Cement lu to surface 30 min recorded 3,500 si surface 7" liner window 20' new formation be and window FIT 10.5 EMW 4 ~h" reduction liner Float a ui ment to surface 30 min recorded 3,500 si surface W-07A Sidetrack Page 2 • • Well Control Well control equipment consisting of S,000psi working pressure pipe rams (2), blind/shear rams, and an annular preventer will be installed and is capable of handling maximum potential surface pressures. The ram configuration will be: BOPE and drilling fluid system schematics are currently on file with the AOGCC. Well Interval: 6 1/8" roduction interval Maximum antici ated BHP: 3,500psi at 8,800' sstvd. Maximum surface ressure: 2,620pS1 (based upon BHP and a full column of gas from TD ~ 0.10 psilft) Calculated kick tolerance: Infinite with 10.0 p EMW FIT. Planned BOPE test pressure: 250psi low / 3,500psi high - 7 day test cycle (~ drilling operations), 14 da test c cle Drillin o erations Planned com letion fluid: 8.4 seawater f 7.1 pp Diesel Disposal Annular Injection: No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations are to be hauled to the Grind and Inject station at DS-04. An metal cuttin s should be sent to the North Slo a Borou h. Fluid Handling: All drilling and completion fluids and other Class 11 wastes are to be hauled to DS-04 j for in ection. All Class I wastes are to be hauled to Pad 3 for dis osal. W-07A Sidetrack Page 3 • • Geologic Prognosis Formation MD TVDbkb TVDss Comments TKNG 7,405 TJG 7,460 TJF 7,735 TJE 7,895 TJD 8,170 TJC 8,380 TJB 8,490 TJA 8,555 TSGR 8,662 TSHA 8,686 TSHB 8,732 TSHC 8,757 Fault 1 8,765 TSHD 8,849 TEIL 8,850 TSAD 8,868 KOP 8,891 Invert t.1 8,953 Fault 2 8,900 TSAD 46P Tar et 2 8,838 Estimated Pore ressure 3,500 si 7.6 EMW i 45P 8,910 44P not enetrated 8,965 Invert t. 2 Tar et 3 8,955 45P 8,960 TSAD 46P Tar et 4 8,935 45P not enetrated 8,970 Invert t. 3 Tar et 6 8,970 TSAD 46P Tar et 7 8,905 45P 8,950 POW C 8,960 TD 8,978 TD Criteria TD Criteria: Minimum TD depth is the TSAD penetration at Target 7, after the inversion into the up-thrown area south of Fault #6. Continue to planned TD, as warranted by structure and LOC. DO NOT drill past southern end of target polygon, so as to avoid enetration of re Tonal fault #7. $~~ W-07A Sidetrack Page 4 • • Fault Prognosis Fault Formation Encountered MD Intersect TVDss Intersect Estimated Throw Direction of Throw Uncertainty Fault #1 Not enetrated N/A N/A ~50' D to the S +/- 100' Fault #2 Ivishak 46P 14,700' -8,900' ~25' D to the N +1- 100' Fault #3 Ivishak 46P 15,500' -8,860' ~20' D to the S +/- 100' Fault #4 Ivishak 46P 16,500' -8,920' ~20' D to the S +/- 100' Fault #5 Ivishak 46P / 45P 18,000' -8,950' ~15' D to the S +/- 100' Fault #6 Ivishak 46P / 45P 18,400' -8,960' ~20' D to the N +/- 100' Fault #7 Not enetrated N!A N/A ~60' D to the S +/- 100' ~t~eratlOnS $Utllnlar Pre-Rig Operations: 1. The 3 '/2", 9.2#, L-80, TDS tubing is badly corroded from ~1,500'md to ~3,900'md, based upon a caliper survey run April 01, 2004. There are multiple holes in the tubing throughout this range. 2. R/U coiled tubing. RIH and plug and abandon the open perforations (112') with 15.8ppg class `G' cement. The estimated cement volume required is 30.5bbls, minimally. This is based upon 529' of 7", 26.0# liner and ~10.Obbls of slurry to squeeze the open perforations. Leave top of cement no deeper than 14,200'. Plan to pump excess cement, as needed, to leave cement top no deeper than 14, 200'md. POOH. 3. Drift the 3'h", 9.2#, L-80 tubing to ~13,700'md, below the planned tubing cut depth of 13,655'md. 4. R/U SWS E-line. RIH with the appropriate chemical cutter and cut the 3'/z" tubing at 13,655'md, in the middle of the full length tubing joint above the `X' landing nipple at 13,679'md. 5. Circulate the well to seawater through the tubing cut, until returns are clean. Conduct a CMIT T X IA to 3,500psi for 30 minutes. 6. Attempt an MIT-OA to 1,500psi. Last MIT-OA failed at 1,900psi on 05/07/2004. 7. Bleed casing and annulus pressures to zero. Freeze protect to 2,200' MD with diesel. 8. Function all tubing and casing Lock Down Screws. A PPPOT-T to 5,OOOpsi and a PPPOT-IC to 3,500psi was conducted on 11/04/2004. All LDS were functioned. 9. Set a BPV. Remove well house and flow line. Level the pad as necessary. Rig Operations: 1. MI / RU Nabors 7ES. 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. Install TWC. 3. Nipple down the tree. Nipple up and test BOPE to 3,500psi. Pull TWC. 4. R/U. Pull the 3'/z" tubing from the tubing cut at ~13,655'md and above. Be prepared to sp6ol up the Otis `XHO' SSSV control lines. 5. M/U an O/S with grapple assembly and RIH, P/U 4" drill pipe. Overshot the tubing stub at 13,655'. Jar the TIW tubing overshot seal assembly free. POOH. 6. RIH and recover the TIW latch assembly. POOH. 7. M/U a Baker packer milling /retrieving assembly. RIH and mill the 9 5/8" TIW HB-BP permanent packer free. POOH with the packer and tail pipe assembly. 8. M/U a 61/8" mills assembly. RIH and drift the 7" liner to the top of the P&A cement plug. 9. R/U and pressure test the casing X liner to 3,500psi for 30 minutes. Record the test. If the pressure test fails, be prepared to POOH and P/U a HES 7" RTTS. 10. Dress cement top to 14,350'md. POOH. a a er 7" whip stock assembly. RIH, orient as desired, and set the whip stock on the top of the P&A cement plug. 12. Shear free from the whip stock. Displace the well to 8.4ppg Flo-Pro based milling fluid. W-07A Sidetrack Page 5 • • 13. Mill a window in the 7" liner at ~14,330'md. Drill/mill approximately 20 feet beyond the middle of the window. ~ 14. Circulate the well clean. Pull into the 7" liner and attempt an FIT to 10.5ppg EMW. POOH, UD mills assembly. 15. M/U a 6 1/8" Dir/GR/Res steer-able assembly. RIH to the window. ~ -; C~~P ~ 16. Drill ahead, per directional proposal, to the end of the high dogleg section at :~L~id. POOH for horizontal BHA. Sc~ 17. M/U the horizontal steer-able assembly. 18. RIH and drill the horizontal interval, per directional program and requirement, to section TD. 19. Circulate and condition the hole in preparation for running 4 1/2", 12.6#, 13Cr-80, VAM TOP-HT liner. POOH. /,= 20. Run and cement the 4'/z" production liner. POOH. 21. P/U and RIH with Schlumberger 2 1/2" DPC perforating guns. Perforate the production intervals, per subsurface team. POOH. / 22. R/U and run a 4 1/2", 12.6#, 13Cr-80, VAM TOP completion, stinging into the 4 1/2" liner tie back sleeve. 23. Space and land the completion. RILDS. 24. Circulate the annulus to seawater with Corrosion Inhibitor. 25. Drop the ball /rod. Set the packer and individually test the tubing and annulus to 3,500psi for 30 minutes. Record each test. 26. Install a TWC. 27. Nipple down the BOPS. Nipple up the adapter and tree and test to 5,OOOpsi. Pull the TWC. 28. Freeze protect the well to 2,200'. Allow the diesel freeze protection fluid to U-tube to equilibrium. 29. Install a BPV. Secure the well. 30. Rig down and move off. Post-Ria Operations: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Re-install the well house, instrumentation, and flow line. Estimated Pre-rig Start Date: 06/20/05 Estimated Spud Date: 08/10/05 Dave Wesley, Jr. Operations Drilling Engineer 564-5153 W-07A Sidetrack Page 6 • • Phase 1: Move In / Rig Up /Test ROPE Planned Phase Time Planned Phase Cost 25 hours $65,251 Reference RP • "Drilling/Work-over Close Proximity Surface and Subsurface Wells Procedure" SOP Issues and Potential Hazards - No wells will require shut-in for the rig move onto W-07. However, W-05 is 35.0' to the North, and W-06 is 35.0' to the South. These are the closest neighboring wells. Care should be taken while moving onto the well. Spotters should be employed at all times. - During MI/RU operations, the W-07 well bore will be secured with the following barriers: o Tubing: the P&A cement plug, kill weight fluid, and a BPV. o IA: Annulus valves and kill weight fluid. o OA: Annulus valve and kill weight fluid. The last MIT-OA to i,800psi on 05/07/2(X14 failed. - Prior to pulling the tree, verify there is a static column of kill weight fluid to surface and that no pressure exists. - During ND/NU BOPE operations, the W-07 well bore will be secured with the following barriers: o Tubing: the P&A cement plug, kill weight fluid, and a TWC. o IA: Annulus valves and kill weight fluid. o OA: Annulus valve and kill weight fluid. The last MIT-OA to 1,800psi on 05/07/2004 failed. - W--pad is r~ttdesignated as an H2S site. However, Standard Operating Procedures for H2S ~` precautions should be followed at all times. Recent H2S data from the pad is as follows: Closest well to SHL Latest H2S reading Closest well to BHL Latest H2S reading W-05 10ppm P-27 70ppm W-06 10ppm W-12A 15ppm The maximum level recorded of H2S on the pad was 15ppm, in 2005. r--~ - Post Permit to Drill and Summary of Drilling Hazards in the dog house and camp prior to spud W-07A Sidetrack Page 7 • • Phase 2: De-complete Well Planned Phase Time Planned Phase Cost 144 hours $486,217 Reference RP •: "De-completions" RP Issues and Potential Hazards - Monitor the well to ensure the fluid column remains static, prior to pulling the completion. - Have all wellhead and completion equipment NORM-tested, following retrieval. - Note that this wellhead is McEvoy SSH. The tubing hanger is McEvoy (5) seal 13" X 3'/z" 8rd top thread and 8rd x TDS bottom thread with a 3.030 type `H' BPV profile. Once the stack has been nippled down, verify the hanger thread and type in preparation for de- completion. - There is a 3'/i" Otis XHO SSSV landing nipple with dual'/a" control lines. There were 31 control line protectors, (1 every other joint) and 4 stainless steel bands (2 at the BVN and 2 at the hanger) used in securing the control lines. - The 3 ~h", 9.2#, L-80, TDS tubing will be chemical cut at ~13,655'md. - The 3'/z", 9.2#, L-80, TDS tubing is badly corroded from ~1,500'md to ~3,900'md, based upon a caliper survey run April 01, 2004. There are multiple holes in the tubing throughout this range. Phase 3: Run Whip Stock Planned Phase Time Planned Phase Cost 46 hours $346,188 Reference RP • "Whip stock Sidetracks" RP Issues and Potential Hazards - There should be ample cement behind the 7" liner at the sidetrack point. - Once milling is complete, make sure all BOP equipment is operable. Follow standard rig procedure in thoroughly cleaning all areas in which metal cuttings may have settled. W-07A Sidetrack Page 8 U • Phase 7: Drill 6 1/8" Production Hole Interval Planned Phase Time Planned Phase Cost 220 hours $1,363,858 Reference RP • "Standard Operating Procedure: Leak-off and Formation Integrity Tests" • "Prudhoe Bay Directional Guidelines" RP Issues and Potential Hazards - The parent well, W-07, experienced no lost circulation events during drilling operations. - There were no significant lost circulation events in drilling nearby surrounding wells. - The planned well, W-07A, is expected to cross five faults while drilling the production interval. The planned trajectory will cross these faults, as summarized in the `Fault Prognosis' table above. The well path will cross these faults perpendicularly. However, each of these fault crossings has been deemed a Moderate lost circulation risk. Phase 9: Run 4 ~h" Production Liner Planned Phase Time Planned Phase Cost 51 hours $492,765 Reference RP • "Modified Conventional Liner Cementing" RP Issues and Potential Hazards - The completion design is to run a 4'/z", 12.6#, 13Cr-80 VAM TOP - HT solid liner throughout the production interval. - Differential sticking is possible. The 8.6ppg Flo-Pro will be ~500psi over balanced to the Ivishak Zone 4 formation. Minimize the time the pipe is left stationary while running the liner. - Sufficient 4'/i" liner will be run to extend 150' back up into the 7" liner. - Ensure the 4 ~/z" liner top packer is set prior to POOH. Phase 10: DPC Perforate Planned Phase Time Planned Phase Cost 42 hours $578,262 Reference RP • "Drill Pipe Conveyed Perforating" RP Issues and Potential Hazards - Approximately 2,500' of 2'h" TCP guns, at 4 spf, are planned. W-07A Sidetrack Page 9 • • - The well will be DPC perforated, ~500psi overbalanced, after running the 4 ~/z" liner. Ensure all personnel are well briefed on Schlumberger's perforating procedures and that all responsibilities are understood. Only essential personnel should be present on the rig floor while making up DPC guns. - Expect to lose fluid to the formation after perforating. Have ample seawater on location and be prepared with LCM if necessary. Phase 12: Run 41/z" 13Cr-80 Completion Planned Phase Time Planned Phase Cost 43 hours $971,205 Reference RP • "Completion Design and Running" RP • "Tubing connections" RP Issues and Potential Hazards - Diesel will be used to freeze protect the well. The diesel flash point is 100° F. Diesel vapor pressure is ~ 0.1 psia at 100° F. - The completion, as designed, will be to run a 4'/z", 12.6#, 13Cr-80, VAM TOP production tubing string, stinging into the 4 ~/z" liner tieback sleeve. Phase 13: ND/NU/Release Rig Planned Phase Time Planned Phase Cost 17 hours $55,871 Reference RP • "Freeze Protecting an inner Annulus" RP Issues and Potential Hazards - During ND BOPE / NU adapter /tree operations, the W-07A well bore will be secured with the following barriers: o Tubing: TWC and kill weight fluid above ball/rod. o IA: Annulus valves and kill weight fluid. o OA: Annulus valve and kill weight fluid. - During RD/MO operations, the W-07A well bore will be secured with the following barriers: o Tubing: Tree, a BPV and kill weight fluid above ball/rod. o IA: Annulus valves and kill weight fluid. ~ o OA: Annulus valve and kill weight fluid. - No wells will require shut-in for the rig move off of W-07A. However, W-05 is 35.0' to the North, and W-06 is 35.0' to the South. These are the closest neighboring wells. Care should be taken while moving onto the well. Spotters should be employed at all times. W-07A Sidetrack Page 10 PO5T THI5 NOTICE IN THE DOG~USE W-07A Rig site Summary of Drilling Hazards i / Standard Operating Procedures for H2S precautions should be followed at all times. The highest concentration currently on record is 15 ppm, measured in 2005. / NORM test all retrieved well head and completion equipment. / The closest neighboring wells, at surface, are W-05 and W-06. Well W-05 is approximately 35' to the North. Well W-06 is approximately 35' to the South. No shut-in should be required, but care should be taken during rig MIRU and RDMO. Use spotters as necessary. / The de-completion of the 3'/2", 9.2#, L-80 tubing may be difficult due the fact that the tubing is thought to be severely corroded from 1,500' to 3,900'. / There are five planned fault crossings in drilling the production interval, at approximately 14,700'md, 15,500'md, 16,500'md, 18,000'md, and 18,400'md. These should all be within the Ivishak, Z4 formation. Though each fault is crossed perpendicularly, each crossing is deemed a Moderate risk for lost circulation. Adequate planning and preparation will be prudent. / Differential sticking may be encountered. Overbalance is approximately 500 psi. Always follow established drilling and connection practices for stuck pipe prevention. / Diesel will be used to freeze protect the well. The diesel flash point is 100° F. Diesel vapor pressure is ~ 0.1 psia at 100° F. CONSULT THE W-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFOF~MATION. W-07A t~~ Schlumherger E., W-07A (P5) „E.~ Prudhoe Bay Unit - WOA S~R~iunE W-PAD ~..,~. ,~ d ° ~~.~~,~,-...~, ~« ~°~~ • 0 0 s 8800 9600 10400 11200 12000 12800 13600 14400 15200 160 8000 m m U 9600 9600 10400 11200 12000 12800 13600 14400 15200 160 Vertical Section (ft) Azim = 144.92°, Scale = 1(in):800(ft) Origin = 0 N/-S, 0 E/-V' 8000 8800 • 9600 -8000 -8800 -9600 ~ -10400 n n z 0 0 c -11200 a~ `~ v v v -12000 -12800 -13600 -sooo -8soo -9600 -10400 - -11200 -12000 -12800 -13600 300 5600 6400 7200 8000 «< W Scale = 1(in):800(ft) E »> 8800 by W-07A Report Date: April 13, 2005 Client: BP Exploration Alaska Field: Prudhoe Bay Unit- WOA StrucWrelSlet: W-P~,W-D7 $ibility Well: W-07 Borehole: Plan W-07A e t1WIlAPM: 500292191801 Survey Name /Date: W-07A (P5) /April 13, 2005 Tort I AHD 1 DDI 1 ERD ratio: 256.985° / 16418.47 ft 16.97511.812 Grid Coordinate System; NAD27 Alaska State Planes, Zone 04, US Feet Location WtlLong: N 70.29672766, W 149.09264612 Location Gdd WE YO(: N 5958925.030 ftUS, E 612048.980 ftUS Grid Convergence Angle: +0.85423761 ° Sch~umberger Pro osal p Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Vertical Section Azimuth: 144.920° S~ ~~ Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 81.56 ft relative to MSL Sea Bed /Ground Level Elevation: 53.06 ft relative to MSL Magnetic Declination: 24.609° Total Field Strength: 57615.187 nT Magnetic Dlp: 80.801 ° Declination Date: April O6, 2005 • Magnetk Declination Model: BGGM 2004 North Reference: True North Total Corr Mag North a True North: +24.609° Cormnants Measured inclination Azimuth Subsea TVD ND Vertical Along Hole NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Departure R d de ft ft ft R ft ft d 1100 R d de 100 ft d 1100 R ftUS ftUS Ile-In survey -IwLaV.au aV.o/ I/J.ac aaov.w~ aaJl.ao wJla.oc -IVavv.oJ roJ°ra.n ovoo.~/ o.wL Ioa.IJ~ -J.JO v.a/ ayoVO/L.vV Top Whipstock 14330.00 50.03 174.00 8875.35 8956.91 10341.85 10530.94 -8375.05 6069.27 1.69 O.OOG -1.65 0.45 5950642.12 Base Whipstock 14343.00 52.11 174.00 8883.52 8965.08 10350.69 10541.05 -8385.10 6070.33 16.00 O.OOG 16.00 0.00 5950632.09 KOP Crv 20!100 14355.00 52.11 174.00 8890.89 8972.45 10358.97 10550.52 -8394.52 6071.32 0.00 -13.10G 0.00 0.00 5950622.69 14400.00 60.89 171.67 8915.70 8997.26 10392.11 10588.01 -8431.71 6076.03 20.00 -11.82G 19.53 -5.17 5950585.58 14450.00 70.70 169.51 8936.18 9017.74 10433.17 10633.55 -8476.64 6083.51 20.00 -10.93G 19.61 -4.32 5950540.77 14500.00 80.53 167.60 8948.59 9030.15 10477.49 10681.93 $524.04 6093.12 20.00 -10.45G 19.65 -3.82 5950493.52 90° Pt 14548.15 90.00 165.86 8952.56 9034.12 10521.99 10729.86 -8570.69 6104.13 20.00 -10.31G 19.67 -3.61 5950447.04 14550.00 90.36 165.79 8952.55 9034.11 10523.72 10731.71 -8572.48 6104.58 20.00 -10.31G 19.68 -3.58 5950445.26 End Crv 14589.46 98.13 164.37 8949.64 9031.20 10560.62 10771.03 -8610.47 6114.70 20.00 O.OOG 19.68 -3.60 5950407.42 Crv 6/100 15309.08 98.13 164.37 8847.90 8929.46 11232.36 11483.43 -9296.54 6306.61 0.00 165.48G 0.00 0.00 5949724.35 15350.00 95.75 164.99 8842.96 8924.52 11270.58 11524.04 -9335.71 6317.34 6.00 165.55G -5.81 1.51 5949685.35 15400.00 92.84 165.74 8839.21 8920.77 11317.29 11573.89 -9383.95 6329.93 6.00 165.61 G -5.81 1.50 5949637.31 W-07A Tgt 2 15448.95 90.00 166.47 8838.00 8919.56 11362.91 11622.82 -9431.44 6341.68 6.00 -180.OOG -5.81 1.49 5949590.00 15450.00 89.94 166.47 8838.00 8919.56 11363.89 11623.87 -9432.47 6341.93 6.00 -180.OOG -6.00 -0.02 5949588.98 15500.00 86.94 166.46 8839.36 8920.92 11410.38 11673.85 -9481.05 6353.62 6.00 -180.OOG -6.00 -0.02 5949540.58 15550.00 83.94 166.45 8843.34 8924.90 11456.73 11723.68 -9529.50 6365.29 6.00 -180.OOG -6.00 -0.02 5949492.31 End Crv 15599.31 80.98 166.45 8849.81 8931.37 1150220 11772.56 -9577.02 6376.74 6.00 O.OOG -6.00 -0.02 5949444.98 Crv 6/100 16194.58 80.98 166.45 8943.15 9024.71 12049.09 12360.47 -10148.55 6514.52 0.00 4.16G 0.00 0.00 5948875.61 16200.00 81.30 166.47 8943.99 9025.55 12054.08 12365.82 -10153.76 6515.77 6.00 4.15G 5.98 0.44 5948870.42 16250.00 84.30 166.69 8950.26 9031.82 12100.18 12415.42 -10202.01 6527.28 6.00 4.13G 5.98 0.44 5948822.35 16300.00 87.29 166.91 8953.93 9035.49 12146.44 12465.28 -10250.55 6538.67 6.00 4.11G 5.98 0.43 5948773.99 W-07A Tgt 3 16345.33 90.00 167.10 8955.00 9036.56 12188.43 12510.59 -10294.70 6548.86 6.00 5.70G 5.98 0.43 5948730.00 16350.00 90.28 167.13 8954.99 9036.55 12192.76 12515.27 -10299.25 6549.90 6.00 5.70G 5.97 0.60 5948725.47 End Crv 16360.93 90.93 167.19 8954.87 9036.43 12202.87 12526.19 -10309.91 6552.33 6.00 O.OOG 5.97 0.60 5948714.85 Crv 6/100 17452.14 90.93 167.19 8937.14 9018.70 13212.53 13617.26 -11373.83 6794.19 0.00 -155.84G 0.00 0.00 5947654.74 W-07A Tgt4 17467.33 90.10 166.82 8937.00 9018.56 13226.61 13632.45 -11388.63 6797.60 6.00 -178.96G -5.47 -2.46 5947640.00 End Crv 17468.99 90.00 166.82 8937.00 9018.56 13228.15 13634.11 -11390.25 6797.98 6.00 O.OOG -6.00 -0.11 5947638.38 Crv 6/100 17733.68 90.00 166.82 8937.00 9018.56 13473.74 13898.80 -11647.97 6858.34 0.00 178.96G 0.00 0.00 5947381.62 018LJO.La N /V.G/J`JLG// VV 14Al.V4JJ8~11 618241.89 N 70.27384098 W 149.04355947 618243.10 N 70.27381351 W 149.04355098 618244.23 N 70.27378778 W 149.04354303 618249.50 N 70.27368618 W 149.04350515 618257.64 N 70.27356342 W 149.04344496 618267.96 N 70.27343389 W 149.04336750 618279.66 N 70.27330643 W 149.04327879 618280.14 N 70.27330153 W 149.04327514 618290.83 N 70.27319771 W 149.04319356 618492.92 N 70.27132300 W 149.04164615 618504.23 N 70.27121597 W 149.04155965 618517.55 N 70.27108416 W 149.04145813 • 618530.00 N 70.27095438 W 149.04136344 618530.26 N 70.27095158 W 149.04136146 618542.68 N 70.27081882 W 149.04126721 618555.07 N 70.27068643 W 149.04117318 618567.22 N 70.27055660 W 149.04108091 618713.49 N 70.26899488 W 149.03997080 618714.82 N 70.26898065 W 149.03996069 618727.05 N 70.26884882 W 149.03986795 618739.16 N 70.26871618 W 149.03977621 618750.01 N 70.26859554 W 149.03969413 618751.12 N 70.26858309 W 149.03968573 618753.70 N 70.26855398 W 149.03966617 619011.37 N 70.26564683 W 149.03771835 619015.01 N 70.26560640 W 149.03769086 619015.41 N 70.26560197 W 149.03768780 619079.60 N 70.26489776 W 149.03720171 WeIlDesign Ver Bid( doc40x_37) W-07\W-07\Plan W-07A\W-07A (PS) Generated 4!13/2005 2:13 PM Page 1 of 2 Comments Measured Inclination Axlmuth Subsea TVD TVD Vertical Nong Nola NS EW OLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section Departure R de de ft R R R R R de 1100 R d de 100 ft d 100 ft ftUS ftUS W-U/A Ig[b 1//:15.:55 tf`J.`JV 1bb,tfL 2f`JJ/.VU yUltf.bb 1J4/5.L`J 1S`JUU.4/ -1ll>4`J.b`J tlt3btl./L tl.VU 'I "i 1.1 iSli -b.UV V.11 b`J4/JBU.UV bIyVCU.UV rv /U.L04t3`JJJJ W 14`J.U:1/1`Jt1Utl 17750.00 89.58 167.64 8937.06 9018.62 13488.84 13915.12 -11663.88 6861.96 6.00 111.18G -2.17 5.59 5947365.76 619083.45 N 70.26485428 W 149.03717258 17800.00 88.50 170,44 8937.90 9019.46 13534.47 13965.11 -11712.95 6871.47 6.00 111.13G -2.17 5.60 5947316.84 619093.69 N 70.26472019 W 149.03709610 17850.00 87.42 173.24 8939.68 9021.24 13579.02 14015.08 -11762.41 6878.56 6.00 111.03G -2.16 5.60 5947267.50 619101.52 N 70.26458506 W 149.03703912 17900.00 86.35 176.04 8942.40 9023.96 13622.37 14065.01 -11812.11 6883.22 6.00 110.88G -2.15 5.61 5947217.88 619106.92 N 70.26444926 W 149.03700179 17950.00 85.28 178.86 8946.05 9027.61 13664.41 14114.87 -11861.92 6885.44 6.00 110.67G -2.13 5.62 5947168.11 619109.88 N 70.26431318 W 149.03698423 18000.00 84.23 181.68 8950.62 9032.18 13705.02 14164.66 -11911.71 6885.21 6.00 110.41G -2.11 5.64 5947118.33 619110.39 N 70.26417717 W 149.03698646 End Crv 18004.77 84.13 181.95 8951.10 9032.66 13708.82 14169.41 -11916.46 6885.06 6.00 O.OOG -2.09 5.65 5947113.58 619110.31 N 70.26416420 W 149.03698771 Crv 6/100 18129.59 84.13 181.95 8963.87 9045.43 13807.94 14293.57 -12040.55 6880.84 0.00 -35.34G 0.00 0.00 5946989.45 619107.94 N 70.26382521 W 149.03702274 18150.00 85.13 181.24 8965.78 9047.34 13824.24 14313.89 -12060.86 6880.27 6.00 -35.28G 4.90 -3.48 5946969.14 619107.68 N 70.26376972 W 149.03702746 18200.00 87.58 179.50 8968.96 9050.52 13864.88 14363.79 -12110.75 6879.95 6.00 -35.17G 4.90 -3.47 5946919.25 619108.10 N 70.26363342 W 149.03703042 W-07A Tgt 6 18249.31 90.00 177.80 8970.00 9051.56 13905.88 14413.08 -12160.03 6881.11 6.00 -35.34G 4.91 -3.45 5946870.00 619110.00 N 70.26349878 W 149.03702141 18250.00 90.03 177.78 8970.00 9051.56 13906.45 14413.77 -12160.72 6881.14 6.00 -35.34G 4.89 -3.47 5946869.31 619110.04 N 70.26349690 W 149.03702120 18300.00 92.48 176.04 8968.90 9050.46 13948.85 14463.76 -12210.63 6883.83 6.00 -35.38G 4.89 -3.47 5946819.45 619113.47 N 70.26336055 W 149.03699977 End Crv 18337.27 94.30 174.74 8966.70 9048.26 13980.91 14500.96 -12247.71 6886.82 6.00 O.OOG 4.89 -3.48 5946782.42 619117.02 N 70.26325924 W 149.03697589 Crv 6/100 19073.79 94.30 174.74 8911.43 8992.99 14618.10 15235.41 -12979.07 6954.13 0.00 -119.54G 0.00 0.00 5946052.21 619195.21 N 70.26126105 W 149.03643724 19100.00 93.53 173.37 8909.64 8991.20 14640.94 15261.55 -13005.07 6956.84 6.00 -119.63G -2.96 -5.23 5946026.25 619198.31 N 70.26119000 W 149.03641555 19150.00 92.04 170.76 8907.22 8988.78 14685.37 15311.49 -13054.53 6963.73 6.00 -119.76G -2.97 -5.22 5945976.91 619205.94 N 7026105487 W 149.03636021 19200.00 90.55 168.16 8906.09 8987.65 14730.84 15361.48 -13103.67 6972.87 6.00 -119.82G -2.98 -5.21 5945927.92 619215.81 N 70.26092061 W 149.03628667 W-07A Tgt 7 19218.41 90.00 167.20 8906.00 8987.56 14747.81 15379.89 -13121.65 6976.80 6.00 -133.60G -2.98 -5.21 5945909.99 619220.00 N 70.26087147 W 149.03625506 End Crv 19244.47 88.92 166.07 8906.24 8987.80 14772.02 15405.95 -13147.00 6982.83 6.00 O.OOG -4.14 -4.35 5945884.74 619226.41 N 70.26080219 W 149.03620656 Crv 6/100 19382.33 88.92 166.07 8908.84 8990.40 14900.58 15543.79 -13280.79 7016.02 0.00 -169.18G 0.00 0.00 5945751.47 619261.58 N 70.26043661 W 149.03593931 19400.00 87.88 165.87 8909.33 8990.89 14917.06 15561.45 -13297.92 7020.30 6.00 -169.18G -5.89 -1.13 5945734.41 619266.12 N 70.26038980 W 149.03590483 W-07A Tgt 8 19414.94 87.00 165.70 8910.00 8991.56 14931.01 15576.37 -13312.39 7023.96 6.00 -156.72G -5.89 -1.13 5945720.00 619270.00 N 70.26035026 W 149.03587532 End Crv 19444.81 85.35 164.99 8911.99 8993.55 14958.93 15606.17 -13341.22 7031.50 6.00 O.OOG -5.51 -2.38 5945691.29 619277.97 N 70.26027149 W 149.03581460 TD / 4-1/2" Lnr 20259.78 ~ 85.35 164.99 8978.00 9059.56 15721.91 16418.47 -14125.80 7241.88 0.00 O.OOG 0.00 0.00 5944910.00 619500.00 N 70.25812752 W 149.03412030 Legal Description: NoRhina (YI fftUSl Eastina IX) fftUSl Surtace : 3948 FSL 1192 FEL S21 711 N R12E UM 5958925.03 612048.98 TD / BHL : 379 FSL 4543 FEL S35 T11 N R12E UM 5944910.00 619500.00 • WeIlDesign Ver Bld( dorstOx_37) W-07\W-071PIan W-07A\W-0lA (P5) Generated 4!13/2005 2:13 PM Page 2 of 2 00 50 68 • Field: Prudhoe Bay Site: PB W Pad Well: W-07 Wellpath: Plan W-07A Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [SONin] ~-O ~ SAFETY NOTES: HOL BG @ 3690', 4506', 5240' MD. 2,071 3 1/2" OTIS'XHO' SSSV nipple, ID=2.75" 13 3/8", 72.0#, 3,155 L-80, BTC Top of 7" liner 13,734 3 112", 9.2#, L-80, 13,782 tubing 9 518", a7.o#, 13,984 L-80, BTC PBTD 14729' 7", 2s.o#, L-8o, 14,770 U4S Liner Minimum ID = 2.750" @ 2071' 3-1 /2" OTIS LANDING NIPPLE TREE = 3" MCEV OY WELLHEAD = CNV ACTUATOR = OTIS KB. ELEV = 90.66' BF. REV = 54.26' KOP = 900' Max Angle = 60 @ 9300' Datum MD = 14217' Datum TV D = 8800' SS GAS LIFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PORT DATE 8 3613 2902 49 MMG RK 7 7563 5108 57 MMG RK 6 9819 6316 58 MMG RK 5 10914 6949 58 MMG RK 4 11790 7424 55 MMG RK 3 12570 7885 55 MMG RK 2 13382 8339 57 MMG RK 1 13630 8474 56 MMG RK 13,679 3 112" OTIS'X' nipple, 1D = 2.750" 13,689 3 112" TNV Tubing Seal Asserr>biy 13,704 9 5/8" X 3 1/2" TIW HB-BP Packer, ID = 2.992" 13,747 3 1/2" OTIS'X' nipple, ID = 2.750" 13,788 3 1/2" OTIS 'X' nipple, ID = 2.750" 13,782 3 1/2" Tubing Tail W/LEG 14,002 -~rkerJoint PERFORATION SUMMARY REF LOG: SWS CET 03/19/89 ANGLE AT TOP PERF: 51 @ 14330' Note : Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 14330 - 14360 O 05/13/94 2" 4 14380 -14397 O 05/16/90 2" 4 14411 - 14428 O 05116!90 5" 4 14431 - 14456 O 03/19/89 5" 4 14466 - 14489 O 03/19/89 DATE REV BY COMMENTS DATE REV BY COMMEMS 03/21/89 ORIGINAL COMPLETION 02(08/01 SIS-QAA CONVERTEDTOCANVAS 03/05/01 SIS-LG FINAL 08/26/01 RN/KAK CORRECTIONS 10/20/02 PP/KAK PERF CORRECTIONS 04/18/05 dew revisions /corrections PRUDHOE BAY UNIT WELL: W-07 PERMIT No: 1890190 API No: 50-029-21918-00 SEC21, T11N, R12E, 1333'SNL & 1103' WEL BP Exploration (Alaska) W-07 P~-rig 13 3/8", 72.0#, 3,155 L-80, BTC SAFETY NOTES: HOL BG @ 3690', 4506', 5240' MD. 2,071 3 1i2" OTIS'XHO' SSSV nipple, ID = 2.75" TREE = 3" MCEV OY WELLHEAD = CNV ACTUATOR = OTIS KB. FlEV = 90.66' BF. ELEV = 54.26' KOP = 900' Max Angle = 60 @ 9300' Datum MD = 14217' Datum TVD = 8800' SS Pre rig Chemical cut 13,655 Top of 7" liner ~ 13,734 3 1/2", 9.2#, L-80, 13,782 tubing 9 5/8", 47.0 13,984 L-80, BTC Pre rig Cement P~ 14,200 PBTD 14729' 7", 26.0#, ~-80, 14,770 U4S Liner Minimum ID = 2.750" @ 2071' 3-1 /2" OTIS LANDING NIPPLE GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT .DATE 8 3613 2902 49 MMG RK 7 7563 5108 57 MMG RK 6 9819 6316 58 MMG RK 5 10914 6949 58 MMG RK 4 11790 7424 55 MMG RK 3 12570 7885 55 MMG RK 2 13382 8339 57 MMG RK 1 13630 8474 56 MMG RK 13,679 3 1/2" OTIS'X' nipple, ID = 2.750" 13,689 3 1/2" TM/ Tubing Seal Assembly 13,704 9 518" X 3 1i2" TNV HB-BP Packer, ID = 2.992" 13,747 3 1/2" OTIS'X' nipple, ID = 2.750" 13,768 3 1/2" OTIS'X' nipple, ID = 2.750" 13,782 3 1/2" Tubing Tail W/LEG 14,002 --~rker Joint PERFORATION SUMMARY REF LOG: SWS CET 03/19/89 ANGLE AT TOP PERF: 51 @ 14330' Note : Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 14330 - 14360 O 05/13/94 2" 4 14380-14397 O 05/16/90 2" 4 14411 - 14428 O 05!16/90 5" 4 14431 - 14456 O 03/19/89 5" 4 14466 - 14489 O 03/19/89 DATE REV BY COMMENTS DATE REV BY C,oMMENTS 03/21/89 ORIGINAL COMPLETION 02/08/01 SIS-QAA CONVERTED TO CANVAS 03/05/01 SIS-LG FINAL 08/26/01 RWKAK CORRECTIONS 10/20/02 PP/KAK PERF CORRECTONS 04!18/05 dew revisions 1 corrections PRUDHOE BAY UNIT WELL: W-07 PERMff No: 1890190 API No: 50-029-21918-00 SEC 21, T11N, R12E, 1333'SNL & 1103' WEL BP Exploration (Alaska) W-07A P~posed CompNtion 2,200 4 1/2" 'X' landing nipple, ID = 3.813" 13 3/8", 72.0#, L-8o, BTC 3,155 Top of 7" liner 13,734 9 5/8", 47.0#, L-8o, BTC 13,984 Marker Joint 14,002 4 1/2", 12.8#, 13Cr-80, VAMTOP 14,170 TREE = 4" CIW WELLHEAD = CM/ ACTUATOR = OTIS KB. ELEV = 82.76' BF. ELEV = 54.26' KOP = 900' Max Angle = 94° @ 18,330' Datum MD = 14350' Datum TV D = 8800' SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 TBD TBD 4 1/2" X 1 1/2" MMG RK 6 TBD TBD 4 1 /2" X 1 1 /2" MMG RK 5 TBD TBD 4 1/2" X 1 1/2" MMG RK 4 TBD TBD 4 1 /2" X 1 1 /2" MMG RK 3 TBD TBD 4 1/2" X 1 1/2" MMG RK 2 TBD TBD 4 1/2" X 1 1/2" MMG RK 1 TBD TBD 4 1/2" X 1 1/2" MMG RK 13,675 4 1/2" 'X' landing nipple, ID = 3.813" 13,700 HES'Symphony Plus' DHPG 14,130 7" X 4 1/2" Baker S-3 Packer 14,150 4 1/2" 'X' landing nipple, ID = 3.813" 14,170 4 1/2" 'XN' landing nipple, ID = 3.725" 14,1$0 Baker 7" X 5" ZXP liner top packer, Flex-Lock hanger w / 'HR' profile and 11' TBS. 14,330 Whipstock exit in 7" liner 7", zs.o#, L-so, 14,770 U4S Liner 3,, a .; s .~ ~; ' ~ ~ ` ® 4 1 /2", 12.6#, 13Cr-80, ` VAM TOP-HT Liner 20,260 ~~ , DATE REV BY COMMENTS DATE REV BY COMMENTS 03/21/89 ORIGINAL COMPLETION 02/08/01 SIS-QAA CONVERTEDTOCANVAS 03/05/01 SIS-LG FINAL 08/26/01 RWKAK CORRECTIONS 10/20/02 PP/KAK PERF CORRECTIONS 05/03!05 dew Proposed completion Wp05 BP Exploration (Alaska) PRUDHOE BAY UNfr WELL: W-07A PERMIT No: API No: 50-029-21918-01 SEC 21, T11N, R12E, 1333'SNL & 1103' WEL TERRIE L RUBBLE: BP EXPLORATION AK INC ~~ ss-sn252 203 'PO BOX 196612 MB 7-5 Mastercard Check" ANCHORAGE, AK 99519-6612 2 ^~S DATE PAY TO THE ~~ ORDER OF ~~yy~~ $~ jlo W (,~ First National Bank Alaska DOLLARS Anchorrag_e~AK 99501 MEMO 1 l {~~' ~ ~:1 2 5 200060:99i4~~~6227~~~L556'~~' 0.203 • • • • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME -/ '-~-~',- ~/~~ CHECK WHAT ADD-ON5 "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (pI~ records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PIS and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCII All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04101/05 C\jody\trans m ittal_check(ist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT W-07A Program DEV Well bore seg ^ PTD#:2050830 Company BP EXPLORATION (ALASt(A) INC Initial Class/Type DEV I 1-Oll. GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ^ Administration 1 Permit fee attached - - Yes - 2 1.easenumberappropriate__,_.___-___-_________________ ___ ____Yes__-__ -___.________._ - - - 3 Unique well-name and number ----- ------- -- - - -- -- - - Yes - - - - -- - - --- - - - ------- - - - ---- --- ----- - - -- 4 Well located to a-definedpool- - - - _ - Yes - - 5 Well locatedproperdistancefromdrillingunit_boundary_.___-__ .___ -__.-.-.-Yes___.___ ______________________________________._____._ 6 Well located properdi_stancefromotherwells__-__.-_-_-__-__,__ ,____-Yes-_____- _. - - 7 Sufficientacreageavail_ablein_drillingunit__________ ___________ ___-____Yes__.___ -___-___-_-__. - - - - - - 8 Ifdeyiated,is_we_Ilboreplat-included-_.____,_._..---__._-._ ______-.Yes_______ ______________________-____- - - 9 Operator Only affected party. - - - - - - Yes - - - - - - - - - 10 Operator has.appropriate_bondin force_-.-..--._-._---_.--__ ..-._-_,Yes._____ _- _____-,-_-. 11 Permit can be issued without conservation order Yes Appr Date 12 Pe[mitcanbeissuedwithoutadministrative_appr_oyal-___.__---____ _,____Yes_______ ___________________-__-_____.____-_._________-,__-_-__,-_--.__, RPC 5125/2005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized bylnjectionOrder#(put_1O#in_comments)-(For_NA___-___ _-___,_____,_______-____-___„________________________-__-__ 15 All wells within114_milearea.ofreyiewidentified(Forservicewellonly)______ _________ NA__.___,- __.__-____.________-.__.._.___.-___._.___.____,.,.-,-.-_-_-.----,- 16 Pre-produced injector; duration of pr_e production Less than, 3 months(For service well only) _ NA_ _ - _ _ . - _ - - - - - - 17 ACMP,Finding of Consistency_has been issued,forthis p[oject_ _ , _ _ - _ NA_ - - - - - - - - - Engineering 18 Conductor string_provided - - - - - - - - NA - - - - - - - - - - 19 Su_rfacecasing.protectsallknownUSDWs______-_-__,_______ ______ __ NA._____ -_____.__-_._-___-____ - - 20 CMT_vol-adequate_tocircul_ate_onconductor&su_rf_csg___-__.._____ ___-.__-_ NA________ ___ ______ 21 CMT_vol-adequate_totie-in long string to surf csg__________________ _________ NA-_____- _,______-_-_- 22 C_MT_willcoyerallknown_productivehorizons_____________________ _________Yes_____- ______-_____-_-_._ 23 CaSingdesignsadegvatef_o[C,TB&_permsfrost__-------------- - --- --Yes------ -------------------------------------------.----------- - _-- 24 Adequatetankage_o_rreseryepit____.._____________________ ________Yes_--_- Nabors_7ES__._-___-_ --------------------------------------------------- 25 If_a.re-dill,has_a-10-403 for abandonment been approved-___________ -_-__-_-Yes__-.__- *__-__.,_,-__-,__,_____.____________________________________,_ 26 Adgquatewellboreseparationproposed________________________ _________Yes-__._-. .__-_.-_ 27 If_djverterlequired,doesitmeetregulations,_____-______-___-__ _____ NA___,___ Sidetrack____________________-_- - - - - - - Appr Date 28 Drillingfluid_programschQmatic&equiplistadequate________________ _____,__Yes__-.__- Max MW8.6ppg,___-___,-____-__-_--__-___--__-_,_-__.-_________-_. WGA 5/25/2005 29 BOPEs,dotheymeetregulation__--._----------------- ____--Yes------- -------------------------------------------------------- -- 30 BOPE_press rafing appropriate; test to_(put prig i_n comments), _ _ _ _ _ _ _ - _ _ _ _ Yes _ . _ - - _ Test to 3500 psi. M$P 2fi20 psi._ _ _ _ _ - _ _ _ - _ _ _ , _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 31 Choke-manifoldc4mplieswlAPI-RP-53GMay 84)____________ ______ _______-Yes-.__-__ _-_-______ - - - - - - 32 Work willoccurwithoutoperationshutdown______-__--_-______ _-_,__,-Yes__-__ ___________________________________--__-___, ----------------------- 33 .Is presence_of H2S gas_probable - - - - - - - - No. - Not an H2S pad. - - - - - - - - - - - - 34 Mechanical_condition of wells within AQR verified (For_servjce well only) _ - _ . _ , . _ NA- Geology 35 Permit_canbeissuedw/ohyd[ogen,sulfidemeasures_______________ .__-___-_ No.__,,._ ______-_-____-___ - - - - - 36 Data_presentedonpotentialoverpressurezones____________ ______ ______-_ NA_._-___ -____-_-_ - - - - - Appr Date 37 Seismic analysis of shallow gas zones_ - - _ _ , - _ _ NA . _ - , . - - . - . - . _ . _ - - - - RPC 5125!2005 38 Seabed condition survey_(if off shore) - _ _ - - - - NA- - - - - - - - 39 -Contact nameiph4ne_for_weekly progress_reports [exploratory only)_ . _ - _ . _ - - - NA, _ - _ _ _ _ - _ , _ _ - - _ - - Geologic Commi sione Engineering Date Date: Co mi si i s Date s r: s m s er on/er: p~m