Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-201
11LCEIVED STATE OF ALASKA 0 ALASKA OIL AND GAS CONSERVATION COM N REPORT OF SUNDRY WELL OPERAS MAY 0 4 2018 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing 0 Op t n Ei Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program E Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 197-201 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22826-00-00 7. Property Designation(Lease Number): ADL 0034624 8. Well Name and Number: PBU P2-52 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PT MCINTYRE OIL 11.Present Well Condition Summary: Total Depth: measured 12520 feet Plugs measured 12245,12391 feet true vertical 9184 feet Junk measured feet Effective Depth: measured 12245 feet Packer measured 11962 feet true vertical 8987 feet Packer true vertical 8779 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 37-117 37-117 3060 1500 Surface 5802 9-5/8" 36-5838 36-4951 5750 3090 Production 12473 7" 34-12507 34-9175 7240/8160 5410/7020 Perforation Depth: Measured depth: 12120-12325 feet True vertical depth: 8894-9045 feet SC MJUN 1 1 201g Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 31-12018 31-8819 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Perm Packer 11962 8779 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data 1 • Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 287 751 5374 2073 0 Subsequent to operation: No test available 2058 0 14.Attachments:(required per 20 AAc 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Kaity Burton Contact Name: Kaity Burton Authorized Title: Pad Engineer Contact Email: Kaity.Burtoncbp.com Authorized Signature: k....ti (.� Date: 573 / 18 Contact Phone: +1 907 564 5554 Form 10-404 Revised 04/2017 ` 0A L 4-'it,/t 8 RBDMS4gP AY 0 8 2018 Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary May 1, 2018 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for perforations in well P2- 52, PTD #197-201. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Daily Report of Well Operations PBU P2-52 ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL***(SLB ELINE PERF) INITIAL T/I/O= 1500/2050/450. RUN 1: PERFORATE 12170'-12190'W/2-7/8" PJO,6 SPF,60 DEG PHASE GUNS. RUN 2: PERFORATE 12150'-12170'W/2-7/8"PJO,6 SPF,60 DEG PHASE GUNS. RUN 3: PERFORATE 12120'-12150'W/2-7/8"PJO,6 SPF,60 DEG PHASE GUNS. ALL LOGS CORRELATED TO SLB GR/CCL LOG DATED 30-JAN-1998 WELL LEFT S/I ON DEPARTURE. FINAL T/I/O= 1380/225/490. 4/13/2018 ***JOB COMPLETE 13-APRIL-2018*** Fluids Summary Bbls Type 2.50 Diesel _ • P2-52 iME TBG&CSG"'REQUIRES A SSSV. TREE= NOTES: WELL WELLHEAD- FMC ACTUATOR- BAKB2C -DIB.H.EV= 47.25' BF-ELEV= ~ KOP= 1774' Max A le= 53" 10086' I I 2006' 4-1/2"CAMCO BAL-O SVLN, D= Datum MD= 1205T a 2112' 9-5/8'HAL TYPE H CEMBNTB2,D=8.5" Datum TVD=_____e 8800'55 9-5/8'CSG,40#,L-80 BUTT-M,D=8.835" H 5836' IH, 11 GAS LET MANDRELS ST MD TVD DEV TYPE VLV LATCH POKE DATE Minimum ID = 3.725" @ 12003' 1 4365 4009 50 KBG-2-LS DOME M 16 05/19/14 4-1/2" OTIS XN NIPPLE I.4 2 8137 6394 51 KBG-2-LS SO NT 20 04/09/14 3 9453 7209 51 KBG-2-LS DMY INT 0 03/23/14 4 10420 7803 52 KBG-2-LS DMY NT 0 03/23/14 5 11379 8398 52 KBG-2-LS DMY NT 0 12/06/97 7"CSG,26#,L-80 BTC,.0383 bpf, D=6.276" -I 11780' X X 6 11893 8731 46 KBG-2-LS DMY M 0 12/06/97 11960' 7"X 4-1/2"BKR S-3 PKR,D=3.875" J 11993' H4-1/2"OTIS XNP,D=3.813" ' 12003' -14-1/2"OTIS XN NP,D=3.725' J1 4-1/2"TBG,12.6#,13CR-80 NSCT, -i 12016' � ---I 12016' -4-1/2" WLEG,I)=3.958" .0152 bpf,D=3.958" 12011' -I ELMD TT LOGGED 01/30/98 • 12052' Hr MARKER JOINT PERFORATION SUMMARY REF LOG: CNP/GR-Sperry on 11/30/97 ANGLE AT TOP FERF: 42"@ 12120' Note:Refer to Production DB for historical pert data SIZE SPF IYTERVAL Opn/Sqz SHOT SO7 2-7/8" 6 12120-12190 0 04/13/18 12245' NTB2WB-L 363-700 HEX PLUG(01/27/1) 3-3/8" 6 12120-12220 S 02/01/98 04/03/14 2-7/8" 6 12150-12170 0 04/19/14 2-7/8" 6 12170-12190 0 07/09/14 - 3-3/8" 6 12265-12325 C 01/30/98 12362'SLMCEMENT(TAGGED 12/29/17) 12391' H 3-3/8"BKR BP(04/17/11) TAGGED 09/20/16 PBTD 12464' iY< '".40`i4, Iii 7"CSG,29#,13CR-80 NSCC, -{ 12505' .0371 bpf,13=6.184" DATE REV BY COMMENTS DATE REV BY COMMB4fS PONT MCNTY RE UNff 01/30/98 ORIGINAL COMPLETION 07/10/14 JLS/JMD ADPERFS(07/09/14) WELL: P2-52 09/16/01 RNKAK CORRECTIONS 01/30/18 KFMJMD SET I-EX PLUG(01/27/18) PER?viT No:'1972010 04/11/14 JTMJM) GLV CJO(04/09/14) 01/31/18ZV/JM) TAGGED TOC(12/29/17) API No: 50-029-22826-00 04/21/14 JLS/JMD ADPERFS(04/19/14) 04/17/18_ MS/JMD ADPERFS(04/13/18) SEC 14,T12N,R14E,523'FM_&1245'Mt 05/20/14 SWC/JMD GLV C/O(05/19/14) 04/26/18 JNUJMD PLUG DEPTH CORRECTIONS 06/24/14 RW PJC CMT SQZ TAG(04/14/14) BP Exploration(Alaska) STATE OF ALASKA • RECEIVED •ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS FEB 1 3 2018 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing ❑ Operation-4 fit •CCp Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: Set HEX Plug [d 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 197-201 3. Address: P.O.Box 196612 Anchorage, Development RI Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22826-00-00 7. Property Designation(Lease Number): ADL 0034624 8. Well Name and Number: PBU P2-52 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PT MCINTYRE OIL 11.Present Well Condition Summary: Total Depth: measured 12520 feet Plugs measured 12245/12250 feet true vertical 9184 feet Junk measured feet Effective Depth: measured 12245 feet Packer measured 11962 feet true vertical 8987 feet Packer true vertical 8779 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 37-117 37-117 3060 1500 Surface 5802 9-5/8" 36-5838 36-4951 5750 3090 Intermediate Production 12473 7" 34-12507 34-9175 7240/8160 5410/7020 Liner Perforation Depth: Measured depth: 12120-12325 feet True vertical depth: 8894-9045 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 31-12018 31 -8819 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Perm Packer 11962 8779 true vertical depth) No SSSV Installed 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED i.+-: +' w" 5 y1 ,$< Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 287 751 5374 1792 283 Subsequent to operation: Shut In 2042 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations RI Exploratory ❑ Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 171 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Sauve,Mark A Contact Name: Sauve,Mark A Authorized Title: GPMA/Lisburne Lead E Contact Email: Mark.Sauve0bp.com Authorized Signature: 67 Date: //j//j Contact Phone: +1 907 564 4660 Form 10-404 Revised 04/2017 "A' VTi— 3"" �j R2 EI) S 1,v F: 1 C18 Submit Original Only • • tiloiet Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary February 13, 2018 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a InterWell HEX Plug for Well P2-52, PTD # 197-201. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 0 • 0 0 N Z "r) < CD Q -� F- r) AQ II N L" D p 0 a a 0 Iii 12 O Q a O 00 0 N m O p J J E' ,_ wit) w N O co I in J II . Q r = 0 J Q } J O >- F- ONX < Cu '43 � >- Z E C < J W N LL E Q O a Q lu cn a o b w Jw CC ~ p D c0 Z Q � 2F a N U) n) N J J f CK O `- LL1 aU W Q «d co m J O f d0 * LU `~ D * Cr '-=-. Cn aawoO O CO * LL � * XOcaz o a cnW � w ~ � ° � = W J Q d a J > ca oo _ - D Ce UF- Z >' (NI iii < 82CD 0 LL N O J Q cn ca 00 a5 ZNMNF- JN ' H z < 1•R. H O• < 0_ b II D ¢ O a � 2 _ o w a o 2 O0 cn � ZX � cc0 Z W J J — Ill O O 0 m w Q > = 0 = m U O O F = O O D 4, _J t — W -1 N 4, 4, M n d ; Cfl W F- Q N- co O Ocn >- N N E O 1 CO �_ N CNJ 0 0 Q TREE= . • PM ELLHEAD= C P2-521 SAFETY NOE TBG&C�.WELL EQUIRES A SSSV. ACTUATOR= BAKER C OKB.EEV= 4725 BF.ELEV KOP= 1774' PMx Angle= 53°f, 10086' I I Li 2006' ] t41/2'CAMCO BA L-0 SV LN. D=3.81'{J Datum MD= 1205T a --I 2112' 9-5/8'HAL TYPE H CEMENTER,D=8.5" Datum N D= 8800'SS {9-5/8'CSG,40#,L-80 BUTT-M,0=8_835' IH, 5838' —4 GAS LFT MANDRELS ST MT) ND DEV TYPE VLV LATCH PORT DATE Minimum ID = 3.726" @ 12003' 1 4365 4009 50 KBG-2-LS DOME NT 16 05/19/14 4-112" OTIS XN NIPPLE y 2 8137 6394 51 KBG-2-LS SO NT 20 04/09/14 3 9453 7209 51 KBG-2-LS DMY NT 0 03/23/14 4 10420 7803 52 KBG-2-LS DMY INT 0 03/23/14 5 11379 8398 52 KBG-2-LS DIM' NT 0 12/06/97 7'CSG,26#,L_80 BTC,.0383 bpf, D=6.276' J--1 11780' —X >G 6 11893 8731 46 KBG-2-LS DMY NI 0 12/06/97 Z X _11960' I {7"X 4-1/2"BKR S-3 PIR,D=3.875" I ' ' 11993' 4-1/2"OTtS X NP,D=3.813' ' I 12003' J-14-1/2"OTIS XN NP,D=3.725"j 4-1/2"TBG, 12-6#, 13CR-80 NSCT, H 12016' 1--ji \ L12016' -1_4-1/2- WLEG,D=3-958" .0152 bpf,ID=3.958" 12011' j—ELMD TT LOGGED 01/30/98 I 12062' ---17'MARKER JOINT PERFORATION SUMMARY REF LOG: CNP/GR-Sperry on 11/30/97 ANGLE AT TOP PERF: 42° 12150' Note:Refer to Production DB for historical perf data 12245' -MSL 363`700 HEX RUG(01/27/18) I SIZE SFF FITBTVAL Opn/Sqz SHOT SQZ / 12362' SLM -]CEMENT SQZ(TAGGED 12/29/17) 3-3/8" 6 12120- 12220 S 02/01/98 04/03/14 J -TOP OFSAND(06/02/11) 2-7/8" 6 12150-12170 0 04/19/14 ---I -- 2-7/8" 6 12170-12190 0 07/09/14 L --j3-3/8"BKR IBP(04/17/11)J 3-3/8' 6 12265-12325 C 01/30/98 L PBTD H 12464' 4,46,i 7'CSG,29#,13CR-80 NSCC, H 12505' -'•�'' .0371 bpf,ID=6.184' DATE REV BY COMMB{TS : DATE RE/BY CC*J U'fTS PONT MCNTY FE UNIT 01/30198 ORIGINAL COMPLETION '07/10/14 JLS/JM) ADPERFS(07/09/14) WELL: P2-52 09/16/01 RN/KAK COi CTIQ/4S ,01/30/18 KFM'JMD SET 1-EX PLUG(01/27/18) PERMT No:'1972010 04/11/14 JTANJMD GLV GO(04/09/14) ;01/31/18 ZV/JMD TAGGED TOC(12/29/17) AR No: 50-029-22826-00 04/21/14 JLS/JMD ADFERFS(04/19/14) SEC 14,T12N,R14E,523'FN..&1245'FWL 05/20/14 SWUM) GLV C/O(05/19/14) 06/24/14 RW/PJC CMT SQZ TAG(04/14/14) BP Exploration(Alaska) XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / ~',~' "~(--~[ File Number of Well History File PAGES TO DELETE RESCAN Color items - Pages: n Grayscale, halftones, pictures, graphs, charts - Pages: n Poor Quality Original'- Pages: Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type 'OVERSIZED n Logs of various kinds n Other Complete COMMENTS: Scanned by: E~ve,y Mildred Dareth~~)3well E] TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: . /si STATE OF ALASKA t , 0 r D AL k OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS A 2014 1.Operations Abandon L1 Repair Well U Plug Perforations U Perforate U Other /4;\�� r C Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ CC�G' f Sq v!< - Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ VLG 5-17-"Z/[d 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development Exploratory ❑ ' 197-201-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22826-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0034624 % PTM P2-52 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): • PRUDHOE BAY,PT MCINTYRE OIL 11.Present Well Condition Summary: Total Depth measured . 12520 feet Plugs measured 12250 feet true vertical 9184.43 feet Junk measured None feet Effective Depth measured • 12232 feet Packer measured 11960 feet true vertical 8977.72 feet true vertical 8777.61 feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"133#H-40 36-116 36-116 3060 1500 Surface 5802 9-5/8"40#L-80 34-5836 34-4949.48 5750 3090 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner None None None None None None Perforation depth Measured depth 12120-12150 feet 12150-12160 _ feet 12160-12170 feet 12170-12220 feet 12265-12285 feet 12285-12325 feet True Vertical depth 8894.42-8916.86 feet 8916.86-8924.33 feet 8924.33-8931.8 feet 8931.8-8968.91 feet 9001.71-9016.1 feet 9016.1-9044.66 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 29-12016 29-8817.49 Packers and SSSV(type,measured and true vertical depth) 8777.61 11960 8777.61 Packer None None None SSSV 12.Stimulation or cement squeeze summary: �i�'� Intervals treated(measured): RBDM�7 MAY 16 2014 12120'-12220'. A� c� `�U N `�a , Treatment descriptions including volumes used and final pressure: y F 30 Bbls 15.8 ppg G LARC Cement,3500 psi. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 138 468 3691 2327 726 Subsequent to operation: 333 0 175 895 708 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run ExploratorL❑ Development❑Q • Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil , U Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catron( BP.Com Printed Name Garry Catron Title PDC PE 0Signature Q,retr //a Phone 564-4424 Date 5/14/2014 ,i4e-t- .5/u//y- Form 10-404 Revised 10/2012 Submit Original Only a) QoO000 co O N O) O N- U - U y 0 0 0 0 0 CO V (fl 10 co 0 N M CO (C) CO N CO C) V V CO O I� V (O 6) CO CO O V CO H co N .4 O M co Lo CO N CO (0 0) Oco (0 (fl co O C0 1.0 O CO N N c Ca V 0 N 2 Q C.OCO M O N t () M M co N •C O 3 J ~ Q o oaooU Cr) V aoo CO J CO J co # N co (.D 4 c U N00 O r - c (A N- O IC) co (b C co N- N co C) I Z Z 00 w Cl/ 000LLZ U Z O O a m U 0- CL a) C C E — O -0 N a) .° Q a) .0 C ' 0 (7 _0 "E (13 N o_ O cs id N N N a-- O a) N N J fn O O a) O i. CI) a) C co E +, o 2 YJ co co 0 (6 b ( > - W N a) (0 •cn E N o (/) N Z ..c) c.) 0O) ° Uz (n0 @) 0 c� Q D � � in � � (1) w0 0 o _M � Q .c O � Co 00 i° ^ OH d 3 a) - o _ © � N HH vo 1-1-1- 22 22 W � a) � = o cNi -jJ �- toHH Lul— u) N o o = = 0 Lo m m 2 M J _ c. o.) OWN o () < z Un — rnW W O a) 3 00• a �_ o 2 Z Z o o - w - -) 2 ca , 3 � 0- 2U — ED UO = D � oQ 0 L U0 as oCT — oY N � � mm - - CO U 0 O � � c - DO. 2 � thNW (ncn � r) n0ON 5o a' � � fu) oov U_ D U 0 o . wwWN d M M min rn pJZ00 fl-00 BYO O � oN D >;� 3d � M Om HHo (n (n - © Un2 H J 0_1-0 a0 Q� Z U U N v m 0, }i 'O N L. 06 w- _ -6 N * + L) d N- c) O �O * WD Q LC a) co .� Q C (1 * `.Z 2 Z c V `- * U o (L 0 < Cr"--) (1) 0- cmc o o u) 0 ,i) (o o J * v D w O OH o - * _ - W O. O• a) = m � � O * o a) > * —iO0O (n (/) "1- FT..... 1 E N a) 2 t0 * II C > E `r N u) >- LL o n 1 J J O O V ON U N Z C > a) cn Oa � c� � � > � o r 0 � � 20 � ICL- 2U0 � Noa`oZ x >% H H a) < Nvrn2w ao > Nv0 U CB o C -_ U N r- O � � r) o ovU N O Z OD DJF- F- OF- F- JJa CIN H p E * O7 � D � o2ww < zz J0 � 0o � D U . a � a) Q'� U � ? � Z � U - - z � Iza) � . cco � O � oOON _ � � 0a) EoQra = O a) Es) 1--0 a) a) HwJN- WZ * * zz - w CO aa)) vm � L- � > a) �c ,- a)) fx EIUDDH ><LU UUHFQ- � NDDH - W LO O , V � O (n > ZZ a (n (n *k *kZ_ Z_ a "' J () N + o' ,_ a) 0 .15)0 3 a) WO JcnHHOoW as QQHH � N J > N o> ma) > H = oo ZZW `� J ch Un � .� 'u) o o cm Dow NQJdZZH > 2 2 W wHH 15D 3 u) a2Pa ' -° * a-i Q � w> D00 • Oww � JJu) u) 00J � -w D •,,,(1) CC _ mO : Q U) — E > r Q00 0HHHJJHH00J c H L O O Q. O a) * H O * * * * 0 w H H W D D W W * * D CC G * C.) 02E a_r- 0_ 3 3 : 000 : : c « Joc < Q (nwwcn (nI (LOU : v v v v 0 o O o O N N N N (NI c) coo a) 01 o J U) _cp __J ..-,..- _1 � o o H1- c 0 Q O O m m Qc -0 L01- 0 N O (0O W o -o 0 Z W > .4- (00) I- N co = W F-- J O - o CC 015 WQJ Q 0_ UJ m WD 2002 Oa Q oo mag ° u ° Q 2W0 F- NQ E o Q _ U U) Z (n w wU0 w - 2T > 2 ° Z O Z 0 ,- M Z ii) u) D O_ � O_ � 0 'M - a) W P F- < - c.1.- 0- 0 ~ N � �p ZCZ uJ U - UWw 2 C m = a o = D £ F- D V 0 02w o Y0 W - F- F- U) F- d ^F- � 4' tUOw co ~ F- O cc W W WW < I21 WL W W Z L a � Q 0Qp w ccaccQC' _1000 _, W Q1 0 W r W nj — N14-1 o2 o � W0E- 0 Qw < Q � N (x@ > F- - 2 F- 0 Of= 0 (7) � O -1m � N000 U) * * O m * c -- 0 , F- F- 0 _1 0 OF- Nv0E- W LU v oZW cw � °'p ccco « � QZz > 22 - 2 � 0II ~ o � � � n Opo � QDtp D * 0) - /) 0) U) - 0Ct o � WONwo � voQQa. o > C) iNcDZEWCo oQ WIQI..`t .- O =-016 * a a W * N N N X N (n } p Q ON 6� E � � � 0 OQ � z � o * w' � 0 � .- Oc- � OZ -. az A a� — vw w » o � 5 ~ _� * QOF- 00 ~ O0) 2QOo cti ~ � c O �� � � vli0U) = WH 0E- OF- F- ZF- � O W ? � 0a WOwW m u. c W 0 EL � Q o O W w J rn Cl_ Z Z - Z Z M Z ©w W Z � � D cQ 4) N � U) Z = W N- 2 F- m A m m 0 or J r- J H LL 0 0- 11 Q Z o c c a .0 (nOoNO � O � OU = U' - C� 1° F- X = O fxZ oN J0 0 o � inZF- W — Z u) oNin <oco � p - 0u) Ew0 MF- 0 U Sp _1001- 1-1-10_ 0 F- -IcOcoMMchch00 � UJ U II _0 _0 cU) N W II mp. w _100 wF- F- F- F- F- - ~ F- m WQOmOO � � , 0 nUO � QJaQLwLI_ u_ u_ Ou- O O� o �a0 > * - - ZDZZ * � � EWOW * * - *> * Od 0U) * F- O2u * * a00000j0 * * - E * v v -4 v v 0 0 0 0 0 N N N N N O ,- NV co V V V 4 o II r J N 0 O W U Z W N < W CC II I- I- J Z W U < • U W 1- M W z II U) O - z O I 0 p (2d Q c -J 5 cOw 0 < 0 coz O d II o w 0, a o w 92 O Z 0N U ? Q _ F- o • Ce) WDOpw W O a 0 c J Q U p O � Qw U J co� � 0- Q 00 d J M f d a 0 2 O Q if c0 u) O p OW, o1pNO (0 vZ >' tr) < CO o 0 p H = II (n Z Z � � ~>== a � F- oz WaQ co II > p W U II D zOU) = i- LL 02 00 H E O J W OQ � (A � � _ J g z J Q D 0 _ Z 0 6) SAF_ eJOTES: WELL REQUIRES A SSSV.CTU AD= AP2-52 "'CHROMETBG&CSG"' ACTUATOR= BAKER C OKB.ELEV= 47.25' BF.Et.EV KOP= 1774' Max Angie= 53"@ 10086' I • [ 2006' 4-1/2"CAMCO BAL-O SVLN, D=3.81" Datum MD= 12057' Q off 2112' 9_5/8"HAL TYPE H CEMENTER,D=8.5" Datum TVD= 8800'SS 9-5/8"CSG,40#,L-80 BUTT-M D=8.835' —j 5836' GAS LIFT MANDRELS Minimum ID = 3.725" @ 12003' ST MD TVD DEV TYPE VLV LATCH PART DATE OTIS XN NIPPLE 1 4365 4009 50 KBG-2-LS DOME INT 16 04/09/14 2 8137 6394 51 KBG-2-LS SO NT 20 04/09/14 3 9453 7209 51 KBG-2-LS DMV NT 0 03/23/14 4 10420 7803 52 KBG-2-LS DMY NT 0 03/23/14 5 11379 8398 52 KBG-2-LS DAN NT 0 12/06/97 r CSG,26#,L-80 BTC,.0383 bpf, 13=6.276" IH 11780' 1—X x 6 11893 8731 46 KBG-2-LS DMY FIT 0 12/06/97 11960' HT'X 4-1/2"BKR S-3 PIR.D=3.875' 11993' H4-1/2"OTIS X NP,D=3.813" ' 12003' H4-1/2“OTIS XN NP,D=3.725' 4-1/2"TBG,12.6#,13CR-80 NSCT, —� 12016' I-- • 12016' —141/2" WLEG,D=3.958" .0152 bpf,D=3.958" 12011' H EIND TT LOGGB 01/30196 • 12052' —{r MAR:ECM JONT PERFORATION SUMMARY IREF LOG: CN3'GR-Sperry on 11/30/97 ANGLE AT TOP PB2F: 42'@ 12120' 12232' H TOP OF LATEX CAP(06/03/11) Note:Refer to Roduction DB for historical perf data 12242' HTOPOF SAND(06/02/11) SEE SR= INTERVAL Opn/Sqz SHOT SOZ 12250' —,3-3/8"BKR IBP(04/17/11) 3-3/8" 6 12120-12220 S 02/01/98 04/03/14 2-7/8" 6 12150-12170 0 04/19/14 v 3-3/8' 6 12265-12325 C 01/30/98 FB1D H 12464' 14.44.•144# 1 i4i.i4i4i..i4i4i4 7'CSG,29#,13CR-80 NSCC, --f 12505' #A.A.A.A.A4 .0371 bpf,D=6.184' DATE REV BY COMENTS DATE REV BY COMMENTS PONT MONTY RE t.NT 01/30/98 ORIGINAL COMPLETION 04/11/14 JTMJM3 GLV CIO(04/09/14) WB-L: P2-52 09/16/01 RNKAK CORRECTIONS 04/21/14 JLS/JM3 ADPE RFS(04/19/14) PE RMT No: 1972010 06/13/11 CAN PJC LATEX CAP(6/3/11) AR No: 50-029-22826-00 06/26/12 AMJM3 GLV C/O(06/22/12) SEC;14,T12N,R14E,523'FN_8 1245'FWL 03/27/14 BSE/JM) GLV CIO(03/23/14) 04/09/14 TAOIJM3 SQUEEZED PERFS(04/04/14) BP Exploration(Alaska) • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 S7 ' ° A ' E U 8 12- Mr. Jim Regg ��. Alaska Oil and Gas Conservation Commission (9 333 West 7 Avenue Anchorage, Alaska 99501 1 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. if you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, (- Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM -2 Date: 04/30/2012 Corrosion l Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls It na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 10.20 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2-08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2 -09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2-31 1940360 50029224560000 2.2 NA 2.2 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2-40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2 -41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2 -43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P2 -47 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P2-49 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 ----,' P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2-59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 01 -AUG -2011 Schhiherger No. 5774 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Stephanie Pacillo 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD R -28 BJGT -00051 SBHPS 23-Jul-11 1 1 MPB -23 BJCR -00099 LEAK DETECTION LOG 22-Jul-11 1 1 06 -01 BBSK -00080 PPROF WI DEFT & GHOST 23- Jul -11 1 1 , U -06B BJGT -00053 SBHPS 25-Jul-11 1 1 M -03A BJGT -00052 SBHPS 24-Jul-11 1 1 01 -20 BBSK -00054 LDWG EDIT OF RST 5- Mar -11 1 1 ! `I b g Y t et 7 , P2-52 BJGT -00021 LDWG EDIT OF RST 6- Mar -11 1 1 -... III PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • i k ``a4E0 SEP .I '2 2411 RECEIVEP AUG '5 2 Arachanwie STATE OF ALASKA , ALASKA 11111AN D GAS CONSERVATION COMMISSICO REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations lel Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development 151 Exploratory ❑ — 197 -201 3. Address: P.O. Box 196612 Stratigraphic0 Service p 6. API Number: Anchorage, AK 99519 -6612 - 50- 029 - 22826 -00 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 034624 — PBU P2 -52 10. Field /Pool(s): E PRUDHOE BAY FIELD / PT MCINTYRE OIL POOL 11. Present Well Condition Summary: Total Depth measured 12505 feet Plugs (measured) 12250 feet true vertical 9173 feet Junk (measured) None feet Effective Depth measured 12464 feet Packer (measured) 11960 feet true vertical 9143 feet (true vertical) 8778 feet Casing Length Size MD TVD Burst Collapse Structural . Conductor 74' 20" 36 - 110 36 - 110 Surface 5802' 9 -5/8" 34 - 5836 34 - 4949 5750 3090 Production 12473' 7" 32 - 12505 32 - 9173 7240 5410 Liner si„ JUN 2 9 2011 Perforation depth: Measured depth: SEE ATTACHED - _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4 -1/2 ". 12.5# 13Cr -80 surface -12016 surface -8817 Packers and SSSV (type, measured and true vertical depth) 4 -1/2" BKR S -3 Packer 11960 8778 ' )A'''''' " ' "0, OA 12. Stimulation or cement squeeze summary: �� a .`SS` Intervals treated (measured): Treatment descriptions including volumes used and final pressure: yip ` i �W • 13. Reprtitative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 362 938 5515 577 Subsequent to operation: 551 1909 3123 589 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development 12 • Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil - 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Elizabeth Barker Printed Name Elizabeth Barker Title Data Manager Signature 4�` Pte' , ti Phone (907) 564 -5674 Date 6/27/2011 RBDMS JUN 2 9 201f- -Z i( Form 10-404 Revised 10/2010 . �' 14--/6A Submit Original Only 064/4]/20// P2 -52 197 -201 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base P2 -52 1/30/98 PER 12,285. 12,325. 9,016.1 9,044.66 P2 -52 1/31/98 PER 12,160. 12,220. 8,924.33 8,968.91 P2 -52 1/31/98 PER 12,265. 12,285. 9,001.71 9,016.1 P2 -52 2/1/98 PER 12,120. 12,160. 8,894.42 8,924.33 P2 -52 6/18/98 FIL 12,291. 12,464. 9,020.4 9,143.57 P2 -52 4/16/99 FIL 12,288. 12,291. 9,018.25 9,020.4 P2 -52 4/17/11 BPS 12,250. 12,325. 8,990.84 9,044.66 P2-52 6/2/11 SPS 12,242. 12,250. 8,985.02 8,990.84 P2 -52 6/3/11 SPS 12,242. 12,265. 8,985.02 9,001.71 AB ABANDONED PER PERF APF ADD PERF RPF REPERF • BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • P2 -52 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 'ACTIVTYDATE:" ....' �„ h� 4/10/2011 ** *WELL FLOWING ON ARRIVAL * ** (profile mod /pre IBP) TAG TOP OF 4 -1/2" CA.WRDP -2 W/ 3.85" G. RING @ 1982' SLM. PULLED 4 -1/2" CA.WRDP -2 (HCS -169) FROM SVLN @ 2006' MD. TAG STICKY BTM AT 12,409' ELM W/ 3 -3/8" DUMMY GUN, TEL, S.BLR. 84' OF RATHOLE. ** *WELL LEFT SHUT IN FOR ELINE, DSO NOTIFIED * ** 4/12/2011 T /I /O = 1220/1810/300. Temp = SI. TBG FL (APE). AL online @ 1810 psi. TBG FL © 1190', IA FL @ 7780'. SV, WV = C. SSV, MV = 0. IA, OA = OTG. NOVP. 4/14/2011 ** *WELL SHUT IN ON ARRIVAL * ** (ELINE XFLOW) SSV OPEN ON ARRIVAL INITIAL T /I /O= 1000, 1750, 300 LOGGED 40, 80, 120 FPM UP /DOWN PASSES THROUGH INTERVAL 12130'- 12350' LOGGED STOP COUNTS AT 12057', 12191', 12329' NO XFLOW DETECTED FINAL T /I /0= 1000/1820/280 WELL LEFT SHUT IN SWAB/WING /SSV CLOSED ** *JOB COMPLETE * ** 4/17/2011 ** *WELL SHUT IN ON ARRIVAL * ** (ELINE IBP) INITIAL T /I /0= 1000/1850/280 BAKER 3 3/8" IBP 1.375" FISHING NECK5500# TO PULL RELEASE, 2X6" LONG + j 1" STIFFENER RING OAL= 11.05'. SET PLUG MOE AT 12250' CCL TO ME= 23.74' CCL STOP DEPTH= 12226.26'. FISHING NECK LOCATED 12242.88'. CORRELATED TO SWS GR/CCL LOG DATED 30- JAN -1998. CONFIRMATION OF SET AT SURFACE. WELL LEFT SHUT IN SWAB /SSV/WING CLOSED OTG. WELL TURNED OVER TO DSO. FINITAL T /I /O= 1000/1740/280 ** *JOB COMPLETE * ** • 4/21/2011 ** *WELL FLOWING ON ARRIVAL * ** DRIFT W/ 3.70" CENTRALIZER, LOCATE T.T. @ 11,982' SLM + 29' = 12011' ELM, TAG IBP @ 12214' SLM, + 29' = 12243' ELM. TARGET IBP SET @ 12242' ELM. ** *JOB CONTINUED ON 4/22/11 * ** 4/22/2011 ** *JOB CONTINUED FROM 4/21/11 * ** SET 4 -1/2" WRDP -2 (SER #HPS -378) IN SVLN @ 1985' SLM /2006' MD. PERFORM DRAWDOWN TEST (pass). ** *WELL TURNED OVER TO DSO * ** 4/24/2011 T /I /O = 200/2400/300. Temp = 90 *. IA FL (DSO request). IA FL @ 8137' (sta #2, S /O). SV =C. WV, SSV, MV =O. IA, OA =OTG. NOVP. 5/5/2011 ** *WELL SHUT IN ON ARRIVAL * ** (Packers & bridge plugs) TAG TOP OF 4 -1/2" CA.WRDP -2 W/ 3.85" G. RING @ 1982' SLM /2006' MD PULLED 4 -1/2" CA.WRDP -2 (HPS -378) FROM SVLN @ 1982' SLM /2006' MD * * *CONT. ON 05/06/11 WSR * ** 5/6/2011 * * *CONT. FROM 05/05/11 WSR * ** (Packers & bridge plugs) TAG IBP W/ 3.50" CENT. BARBELL, 3.25" LIB @ 12214' SLM/12250' ELM (IMPRESSION OF IBP) ** *WELL LEFT SHUT IN, DSO NOTIFIED * ** • • 6/1/2011 ** *WELL S/I ON ARRIVAL * ** (Profile Mod / Post IBP) DUMP BAILED 1 BAG (50 #) SAND ON TOP OF IBP @ 12219' SLM. * * *LDFN, JOB CONTINUED ON 6/2/11 WSR * ** 6/2/2011 ** *JOB CONTINUED FROM 6 -1 -11 WSR * ** (profile mod / post ibp) DUMP BAILED 150Ibs OF 20/40 SAND ON IBP @ 12219' SLM TAGGED TOP OF SAND 12242' ELMD W/ 4 1/2" BRUSH, TEL, 3.50" BLINDBOX ** *JOB CONTINUED ON 6/3/11 WSR * ** 6/3/2011 ** *JOB CONTINUED FROM 6/2/11 WSR * ** (profile mod / post ibp) DUMPED 13 GALLONS OF LIQUID LATEX ON SAND CAP COVERING IBP @ _ 12250' ELM. ** *JOB COMPLETE, WELL LEFT S /I, DSO NOTIFIED * ** FLUIDS PUMPED BBLS 2 METH 6 DIESEL 8 TOTAL TREE WFI J HEAD = FMC P2-52 SAFETY NO• WELL REQUIRES A SSSV. ACTUATOR = BAKER C ** *CHROMETBG & CSG*** KB. ELEV = 47.25' BF. ELEV = KOP = 1774' Max Angle = 53 @ 10086' ( I 2006' I — I 4 -1/2" CAMCO BAL -O SVLN, ID = 3.81" I Datum MD = 12057 a H 2112' ( — 9-5/8" HAL TYPE H CEMENTER, ID = 8.5" I Datum TV D = 8800' SS 19 -518" CSG, 40 #, L -80 BUTT -M, ID = 8.835" H 5836' I GAS LIFT MANDRELS ST MD 1VD DEV TYPE VLV LATCH PORT DATE Minimum ID = 3.725" @ 12003' 1 4365 4009 50 KBG -2 -LS DOME NT 16 09/11/05 OTIS XN NIPPLE 2 8137 6394 51 KBG -2 -LS SO NT 24 09/06/05 3 9453 7209 51 KBG -2 -LS DMY NT 0 09/06/05 4 10420 7803 52 KBG -2 -LS DMY NT 0 12/06/97 5 11379 8398 52 KBG -2 -LS DMY NT 0 12/06/97 17" CSG, 26#, L -80 BTC, .0383 bpf, ID = 6.276" 1—I 11780' ,--X ?C 6 11893 8731 _ 46 KBG -2 -LS DMY INT 0 12/06/97 L 11960' 7" X 4 -1/2" BKR S -3 PKR, ID = 3.875" ' ! I 11993' H4-1/2" OTIS X NIP, ID = 3.813" I I 12003' H4-1/2" OTIS XN NIP, ID = 3.725" I 4 -1/2" TBG, 12.6 #, 13CR -80 NSCT, — 12016' I 12016' I - 112" WLEG, ID = 3.958" I .0152 bpf, ID = 3.958" 1 12011' I — i ELMD TT LOGGED 01/30/98 I • I 12052' H7" MARKER JOINT I PERFORATION SUMMARY REF LOG: CNP /GR - Sperry on 11/30/97 ANGLE AT TOP PERF: 42° @ 12120' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 3 -3/8" 6 12120 - 12220 0 02/01/98 12232' I — { TOP OF LATEX CAP (06/03/11) I 3 -3/8" 6 12265 - 12325 0 01/30/98 12242' I—ITOP OF SAND (06 /02/11) 1 12250' --I -3/8" BKR IBP (04/17/11) 1 I PBTD I 12464' I it • 7" CSG, 29 #. 13CR -80 NSCC, -- 12505' 11�11� +1x11 .0371 bpf, ID= 6.184" DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 01/30/98 ORIGINAL COMPLETION 04/29/11 SRD/ PJC SET IBP (04/17/11) WELL: P2 -52 09/16/01 RN/KAK CORRECTIONS 04/29/11 PJC DRAWING CORRECTONS PERMIT No: '1972010 04/26/04 PWE/KAK CORRECTIONS 06/13/11 CJN/ PJC DUMP SAND (6/2/11) API No: 50- 029 - 22826 -00 09/06/05 DTR/TLH GLV C/O 06/13/11 CJN/ PJC LATEX CAP (6/3/11) SEC 14, T12N, R14E, 1893.27' FEL & 1207.98' FNL 09/11/05 KSB/TLH GLV GO 02/18/11 MB /JMD ADDED SSSV SAFETY NOTE BP Exploration (Alaska) 05/06/11 Schleemberger NO. 5738 Alaska Data & Consulting Services .o ( Company: State of Alaska e l 2525 Gambell Street, Suite 400 / '� Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 '`�/�1` Attn: Christine Shartzer A7TN: Beth We st 7t, An ch W o rage h , AK Ave 99 501 Suite 100 Well Job # Log Description Date BL Color CD P2 -16 BBSK -00061 USIT — u - 04/04/11 1- 35/0 -25 BBKA -00101 PRODUCTI a N PROFILE _ ' -- ,' - Z/ 04/04/11 1 � '2 �(, 1 P2 -52 BJGT -00027 CROSS FLOW CHECK -11" + ' - 04/14/11 1 Qrl _ 1 03 -37 BJGT -00028 INJECTION PROFILE LT d.. _ ma• __ 1 04/16/11 1 "TPA 1 242/P -13 BAUJ -00076 MEM LDL & 'a 04/15/11 1 1 N -11 C BH4H -00048 PRODUCTION PROFILE q-- jCi a. 04/19/11 1 -JLlCO G 1 02 -12C BDBB -00098 MEM CBL I s' • « 04/21/11 V y' 1 1 S -120 BD88-00100 MEM INJECTION PROFILE 11 - r0 A, • - (G:14 04/25/11 1 zeQ,fft 1 P1 -09 BJOH -00024 PRODUCTION PROFILE J04 -- / - 05/01/11 1 q4,2 1 P1 -09 BJOH -00024 SCMT — 05/02/11 l ( 1 1 • P2-43 _ BG4H - 00049 SCMT `.7^ -- (*) _. I 04/28/11 14 /(05 — 1 1 16-21 BJGT -00030 PRODUCTION PROFILE /75 ',. ` ;-) 04/28/11 1 09 -26 BD88 -00104 MEM LDL t ! l''' 6,3 1. ;,-.)(141- 04/30/11 1 i`/ i J( 1 04 -33A BLPO -00095 MEM PRODUCTION PROFIL (7 GJ 04/30/11 1 /C..“„, j 'zr 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc Alaska Data & Consulting Services Petrolechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 1 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • 1 • 02/23/11 Sdiaaberger NO. 5698 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oi1 & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD P2 -31A BCRD -00081 TEMP & X/Y CALIPER SURVEY ...,,/QtT /4 "/) 02/06/11 1 CA5 fj r 1 E -03A 8L65 -00015 SCMT �)n / —01 - 4 - 01/27/11 9051,06 1 1 04-21 BG4H -00031 PRODUCTION - PROFILE ;S' — ?•1 a-. 02/02/11 1 65" 1 04 -17 BG4H -00029 INJECTION PROFILE / C3 _ 01/31/11 1 1��}} • -05•1:. l - 02/09/11 1 Il�i� , 1 11-04A BG4H -00032 X -FLOW CHECK/IBP Vi ' . _ . 1 W-202 _ . BMSA-00005 ISOLATION SCANNER —/ 01/30/11 . 44n/ 1 1 15-268 BD88 -00088 MCNL O G/- / -# 12/13/10 1 1 15 -11C BD88 -00081 MCNL 6 - /Co 01/06/11 1 P 1 07 -09A BD88 -00078 MCNL [) — / g _ 12/08/10 1 J �• 1 K -12B BCUE -00094 MCNL '. 0 q — / L / 11/23/10 1 eN �} 1 • E -358 B088 -00077 MCNL 4 (U - / (.0 12/05/10 1 ` 1 B -04A BAUJ -00055 MCNL di�) ,. (t) 11/21/10 1 fj s "" 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • t MAR 1 5 2011 MAR 1 4 ; 11 03/08/11 Sehhimherger NO. 5701 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD W -202 BMSA -00004 MDT ,' ft) ..... /', 01/22/11 1 ' . 493 1 1 W -202 BMSA -00005 ISOLATION SCANNER (USIT ()— / 3 01/30111 1 1 V -02 BL65 -00016 SCMT c p [1 q.- (D-t- 02/01111 1 1 A -39A BL85.00018 MEM DEPTH CORRELATION 1() - ,/ - 02/03111 1i- 1 J -17C BAUJ -00061 MEM PROD PROFILE -) Q °- O1( 02/09/11 1 a�4 1 18 -13C AWJI.00126 MEMORYCBL � - / 02/10/11 and 1 1 R -12 BBKA -00087 PRIMARY DEPTH CONTROL LOG /* — cr):3,1 02/18/11 1 • - 4 , , 1 D -21 BG4H -00036 PRODUCTION PROFILE - 02/20/11 1. 1 W -18 BJOH -00010 _ PRODUCTION PROFILE t immi.sr 02/13/11 1 1 H -20 BBSK -00051 PRODUCTION PROFILE '-' 41, 02111/11 1 - 1 (0,..„0, P2-52 BCRD -00082 SCMT ( n j `]- - a(} t 02/10/11 olg 1 1 al PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 .., MAC 1 , • T AP 14 2011 C....g . ,.. Conq,, 67—,40 :' a Schtuml~erger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # NO. 5460 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD 13-35 8746-00084 INJECTION PROFILE - ~~- Z-27 17-09 05-38 P2-52 17-09 AGI-Ot B3S0-00043 B5JN-00031 AYKP-00063 82ND-00050 AYKP-00064 BBKA-00003 GLS / - p LDL - p PRODUCTION PROFILE - MEMORY XY CALIPER - USIT ~ USIT ~ - L 11/10/09 01/07/10 01H1/10 01/21/10 01/24/10 01/22/10 1 1 1 1 1 1 1 1 1 1 1 1 01-198 H-13A 07-26 AWJh00062 82NJ-00042 BALL-00007 MCNL MCNL G( ~ RST 01M8/10 12/03/09 11!29/09 1 1 1 1 1 1 07-19A 63S0-00036 RST ~(~ 12/08/09 1 2-14/0-16 AZCM-00050 RST ( - 12/25/09 1 1 Pi-24L1 W-217 W-217 PB1 12034915 09AKA0091 09AKA0091 o OH LDWG EDIT (FLEX .- Q OH MWD/LWD EDIT ~ OH MWD/LWD EDIT 12/08/09 08/08/08 t i/23/Oy 11/15/09 1 1 2 2 1 1 1 1 PLEASE ACKNOWLEDGE REC EIPT 8V SIGNIN G enln aanrcurur_ nuc r•nov ~...~. ~.._ BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. ~~ \`J Alaska Data & Consulting Services • 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 THE MATERIAL UNDER THIS COVER HAS BEEN OR P M ATE IA · ,, .._ ~W C:LOR~4TILM.DOC . i'97-201-0 POINT MCINTYRE P2-52 50- 029-22826-00 ARCO MD 12520 TVD 09184 ~aY-mpletionDate: ~4730/98 Completed Status: 1-OIL Current: T Name Interval Sent Received T/C/D D 8100 D 8198 L DGR/CNP/SLD-MD C.F~AL 5820-12520 L DGR/CNP/SLD-TVD .,~IAL 4958-9184 L DGR/EWR4-MD L DGR/EWR4-TVD L RFT R DIR SRVY R MWD SRVY 2 SPERRY GR OH 2,3 SPERRY MPT/GR/EWR4/CNP/SLD OH OH OH qvI~NA L 5820-12520 OH -,F/1NAL 4958-9184 OH ~ql~AAL 11920-12330 CH 5 9/10/97 9/10/97 12/17/97 12/17/97 12/23/97 12/24/97 12/23/97 12/24/97 12/23/97 12/24/97 12/23/97 12/24/97 1/28/98 1/29/98 /.3C~LU M 0.-1350. OH 3/30/98 3/31/98 c.8F~'RY 1,350.-12,520. OH 12/19/97 12/24/97 Daily Well Ops/I/~2~/??- ~,~/,~'~ Are Dry Ditch Samples Required? yes ~_._~And Reoei-ved?-yes no Was the well cored? yes~_p Analysis Description ceived? Comments: Thursday, February 03, 2000 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [~] Oil I~ Gas [] Suspended I~ Abandoned [~] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 97-201 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22826 ;4. Location of well at surface ! ............ 9. Unit or Lease Name 523' SNL, 1245' EWL, SEC. 14, T12N, R14E, UM...,-~ ~'i "~ '~'~"-~,, -"" ~':'~' ~' '¢~:~"~:,~:'-~"~'~'~l Point Mclntyre At top of productive interval ¢ ..... : ~ %~ .~! 10. Well Number 1239' SNL, 3111' EWL, SEC. 13, T12N,R14E, UM ' ~-J. '-"'~.¢;'~ ~,~ P2-52 Attotal depth ~,_~,~-'? 11 Field and Pool 1206' SNL, 3386' EWL, SEC. 13, T12N, R14E, UM ' ~ ' "" ~ ............. -~? Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 47.25'I ADb034624 12. Date Spudded11/23/97 I 13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °fish°re 16' N°' °f C°mpleti°nsl 2/2/97 1/30/98 N/A MSL One 117. Total Depth (MD+TVD) I18. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 12520 9184 FTI 12464 9143 FTI [~Yes I--]NoI 2006' MDt 1800' (Approx.) 22. Type Electric or Other Logs Run Gyro, MWD, RFT, DIR/GR/RES/DEN/NEU, GR/CCL 23. CASING, LINER AND CEMENTING RECORD CASING SE'FFING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 133# H-40 36' 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 34' 5836' 12-1/4" 1440 sx Coldset III, 522 sx Class 'G' 7" 26#/29# L-80/13CR 32' 12505' 8-1/2" 260 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 4-1/2", 12.6#, 13CR80 12016' 11960' MD TVD MD TVD 12120'-12220' 8894'-8968' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12265'-12325' 9001 '-9044' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 315 bbls diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) February 2, 1998I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBb GAS-MCF WATER-BBb OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA o ,,-'" ~ .... .... Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or~a~r~ c~¢.~hips. ~j~sk~ 0il & ~'~ Cons. C0~i~is~0n Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. West Sak 8964' 6907' HRZ 12010' 8813' Kalubik 12092' 8873' Kuparuk River 12117' 8892' Miluveach 12364' 9072' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the ~regoingsignedSteveShultzp2_52 -//~'~U "(~i~97-2~~'t~ is_,true arid correct to the best of my knowledgeTitle Engineering Supervisor Date Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Performance Enquiry Report Operator ARCO Date 01:18, 07 Mar 98 Page 1 The analysis is from - 04:00, 28 Nov 97 - to - 04:00, 28 Nov 97 Programs in Result Table: P2-52 Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) P2-52 Event 04:00, 28 Nov 97 04:00, 28 Nov 97 0 hr 0 min Obtained leak off 12.6 Hole Size MDR 8-1/2 Progress Report Facility Pt Mac 2 Well P2-52 Rig Doyon 14 Page 1 Date 18 February 98 Date/Time 22Nov97 11:00-11:30 11:30-13:30 13:30-15:00 15:00-17:30 17:30-19:00 19:00-20:30 20:30-21:30 21:30-23:15 23:15-23:30 23:30-00:00 23 Nov 97 00:00-00:30 00:30-03:30 03:30-04:30 04:30-05:15 05:15-05:30 05:30-06:00 06:00-14:30 14:30-15:30 15:30-16:00 16:00-00:30 24 Nov 97 00:30-06:00 06:00-01:15 25 Nov 97 01:15-01:45 01:45-02:15 02:15-02:45 02:45-06:00 06:00-01:15 26 Nov 97 01:15-02:15 02:15-04:00 04:00-05:00 05:00-06:00 06:00-06:15 06:15-08:30 08:30-11:00 11:00-12:30 12:30-12:45 12:45-18:45 18:45-19:00 19:00-20:30 20:30-21:00 21:00-21:15 21:15-22:15 22:15-22:45 22:45-23:30 23:30-23:45 23:45-02:00 27 Nov 97 02:00-02:15 02:15-03:00 03:00-03:30 03:30-06:00 06:00-06:15 06:15-07:00 07:00-11:00 11:00-15:00 Duration 1/2 hr 2 hr 1-1/2 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 1 hr 1-3/4 hr 1/4 hr 1/2 hr 1/2 hr 3 hr 1 hr 3/4 hr 1/4 hr 1/2 hr 8-1/2 hr 1 hr 1/2 hr 8-1/2 hr 5-1/2 hr 19-1/4 hr 1/2 hr 1/2 hr 1/2 hr 3-1/4 hr 19-1/4 hr 1 hr 1-3/4 hr 1 hr 1 hr 1/4 hr 2-1/4 hr 2-1/2 hr 1-1/2 hr 1/4 hr 6 hr 1/4 hr 1-1/2 hr 1/2 hr 1/4 hr 1 hr 1/2 hr 3/4 hr 1/4 hr 2-1/4 hr 1/4 hr 3/4 hr 1/2 hr 2-1/2 hr 1/4 hr 3/4 hr 4 hr 4 hr Activity Skid rig Rig moved 100.00 % Rigged up Drillfloor / Derrick Serviced Fluid system Held safety meeting Serviced Fluid system Serviced Kelly/top drive hose Made up BHA no. 1 Held safety meeting Circulated at 80.0 ft Drilled to 200.0 ft Made up BHA no. 1 Took Gyro survey at 180.0 ft Drilled to 288.0 ft Took Gyro survey at 288.0 ft Drilled to 307.0 ft Drilled to 915.0 ft (cont...) Pulled out of hole to 80.0 ft R.I.H. to 915.0 ft Drilled to 1441.0 ft Drilled to 2013.0 ft Drilled to 4009.0 ft (cont...) Circulated at 4009.0 ft Pulled out of hole to 3047.0 ft R.I.H. to 4009.0 ft Drilled to 4359.0 ft Drilled to 5850.0 ft (cont...) Circulated at 5850.0 ft Pulled out of hole to 1800.0 ft R.I.H. to 5850.0 ft Circulated at 5850.0 ft Flow check Pulled out of hole to 1080.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Casing to 5836.0 ft (9-5/8in OD) Rigged up Cement head Circulated at 5836.0 ft Held safety meeting Pumped Water spacers - volume 50.000 bbl Mixed and pumped slurry - 224.000 bbl Mixed and pumped slurry - 107.000 bbl Displaced slurry - 433.000 bbl Functioned DV collar Circulated at 2014.0 ft Pumped Water spacers - volume 50.000 bbl Mixed and pumped slurry - 268.000 bbl Displaced slurry - 153.000 bbl Rigged down Cement head Held safety meeting Rigged down Divertor Rigged up BOP stack Tested BOP stack Facility ! Pt Mac 2 Progress Report Well P2-52 Page Rig Doyon 14 Date 2 18 February 98 Date/Time 28 Nov 97 29 Nov 97 30 Nov 97 01 Dec 97 02 Dec 97 03 Dec 97 15:00-18:00 18:00-18:45 18:45-19:00 19:00-20:00 20:00-21:30 21:30-22:15 22:15-22:45 22:45-01:00 01:00-01:30 01:30-02:00 02:00-03:00 03:00-04:00 04:00-06:00 06:00-00:45 00:45-01:30 01:30-02:30 02:30-03:00 03:00-04:00 04:00-06:00 06:00-22:00 22:00-23:00 23:00-23:15 23:15-02:30 02:30-03:30 03:30-03:45 03:45-05:00 05:00-06:00 06:00-07:45 07:45-08:30 08:30-10:00 10:00-10:30 10:30-06:00 06:00-11:30 11:30-12:15 12:15-12:30 12:30-13:15 13:15-14:00 14:00-06:00 06:00-07:15 07:15-07:30 07:30-09:45 09:45-10:30 10:30-13:30 13:30-14:30 14:30-16:30 16:30-19:30 19:30-20:00 20:00-20:45 20:45-22:30 22:30-22:45 22:45-02:30 02:30-05:00 05:00-06:00 06:00-07:00 Duration 3 hr 3/4 hr 1/4 hr 1 hr 1-1/2 hr 3/4 hr 1/2 hr 2-1/4 hr 1/2 hr 1/2 hr 1 hr 1 hr 2 hr 18-3/4 hr 3/4 hr 1 hr 1/2 hr lhr 2hr 16hr lhr 1/4 hr 3-1/4 hr 1 hr 1/4 hr 1-1/4 hr lhr 1-3/4 hr 3/4 hr 1-1/2 hr 1/2 hr 19-1/2 hr 5-1/2 hr 3/4 hr 1/4 hr 3/4 hr 3/4 hr 16hr 1-1/4 hr 1/4 hr 2-1/4 hr 3/4 hr 3 hr 1 hr 2 hr 3 hr 1/2 hr 3/4 hr 1-3/4 hr 1/4 hr 3-3/4 hr 2-1/2 hr 1 hr 1 hr Activity Made up BHA no. 2 Serviced Block line R.I.H. to 2011.0 ft Drilled installed equipment - DV collar R.I.H. to 5708.0 ft Tested Casing - Via string Held drill (Kick (well kill)) Drilled cement to 5870.0 ft Circulated at 5870.0 ft Performed formation integrity test Circulated at 5870.0 ft Performed formation integrity test Drilled to 6038.0 ft Drilled to 7847.0 ft (cont...) Circulated at 7847.0 ft Pulled out of hole to 5894.0 ft Serviced Kelly R.I.H. to 7847.0 ft Drilled to 8006.0 ft Drilled to 9464.0 ft (cont...) Circulated at 9464.0 ft Flow check Pulled out of hole to 639.0 ft Downloaded MWD tool Pulled BHA Made up BHA no. 3 R.I.H. to 1495.0 ft R.I.H. to 5836.0 ft (cont...) Serviced Block line R.I.H. to 9464.0 ft Circulated at 9464.0 ft Drilled to 11074.0 ft Drilled to 11457.0 ft (cont...) Circulated at 11457.0 ft Flow check Pulled out of hole to 9411.0 ft R.I.H. to 11457.0 ft Drilled to 12441.0 ft Circulated at 12441.0 ft Flow check Pulled out of hole to 5836.0 ft Serviced Block line R.I.H. to 12411.0 ft Reamed to 12441.0 ft Drilled to 12520.0 ft Circulated at 12520.0 ft Pulled out of hole to 11541.0 ft R.I.H. to 12520.0 ft Circulated at 12520.0 ft Flow check Pulled out of hole to 662.0 ft Pulled BHA Rigged up sub-surface equipment - Formation logs Rigged up sub-surface equipment - Formation logs (cont...) Progress Report Facility Pt Mac 2 Well P2-52 Rig Doyon 14 Page 3 Date 18 February 98 Date/Time 07:00-11:00 11:00-11:30 11:30-17:30 17:30-18:00 18:00-20:00 20:00-20:30 20:30-01:30 04 Dec 97 01:30-02:30 02:30-06:00 06:00-07:30 07:30-07:45 07:45-12:15 12:15-12:30 12:30-13:15 13:15-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-21:00 21:00-00:45 05 Dec 97 00:45-03:30 03:30-04:30 04:30-05:00 05:00-06:00 06:00-08:00 08:00-08:15 08:15-16:30 16:30-17:30 17:30-18:00 18:00-18:15 18:15-19:15 19:15-19:30 19:30-02:15 06 Dec 97 02:15-03:15 03:15-06:00 06:00-10:00 10:00-14:00 14:00-14:15 14:15-14:45 14:45-15:30 15:30-16:00 16:00-16:30 16:30-17:00 17:00-17:30 17:30-18:00 18:00-18:30 18:30-06:00 07 Dec 97 06:00-10:00 10:00-11:15 11:15-14:15 14:15-15:30 15:30-16:30 16:30-18:00 18:00-19:00 Duration 4 hr 1/2 hr 6 hr 1/2 hr 2 hr 1/2 hr 5 hr lhr 3-1/2 hr 1-1/2 hr 1/4 hr 4-1/2 hr 1/4 hr 3/4 hr 1-3/4 hr 1 hr 1 hr 1 hr 3 hr 3-3/4 hr 2-3/4 hr lhr 1/2 hr 1 hr 2 hr 1/4 hr 8-1/4 hr 1 hr 1/2 hr 1/4 hr 1 hr 1/4 hr 6-3/4 hr lhr 2-3/4 hr 4 hr 4 hr 1/4 hr 1/2 hr 3/4 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 11-1/2 hr 4 hr 1-1/4 hr 3 hr 1-1/4 hr 1 hr 1-1/2 hr 1 hr Activity R.I.H. to 5836.0 ft Rigged up Wireline units R.I.H. to 11900.0 ft Conducted electric cable operations Conducted electric cable operations R.I.H. to 12120.0 ft Ran logs on tubulars Pulled out of hole to 11900.0 ft Pulled out of hole to 0.0 ft Rigged down Wireline units Retrieved Wear bushing Tested BOP stack Serviced Wear bushing Made up BHA no. 4 R.I.H. to 5836.0 ft Serviced Block line R.I.H. to 8326.0 ft Reamed to 8592.0 ft R.I.H. to 12116.0 ft Reamed to 12520.0 ft Circulated at 12520.0 ft Pulled out of hole to 11554.0 ft R.I.H. to 12445.0 ft Reamed to 12520.0 ft Circulated at 12520.0 ft Flow check Laid down 11950.0 ft of 5in OD drill pipe Pulled BHA Removed Wear bushing Held safety meeting Rigged up Casing handling equipment Held safety meeting Ran Casing to 5800.0 ft (7in OD) Circulated at 5800.0 ft Ran Casing to 7in (8374.0 ft OD) Ran Casing to 12505.0 ft (7in OD) (cont...) Circulated at 12505.0 ft Held safety meeting Pumped Inhibited brine spacers - volume 20.000 bbl Mixed and pumped slurry - 55.000 bbl Displaced slurry - 477.000 bbl Tested Casing Rigged down Cement head Installed Seal assembly Retrieved Seal assembly running tool Serviced Block line Ran Tubing to 6495.0 ft (4-1/2in OD) Ran Tubing to 6495.0 ft (4-1/2in OD) (cont...) Installed SCSSSV control line Ran Tubing to 12015.0 ft (4-1/2in OD) Installed Hanger assembly Removed BOP stack Installed Xmas tree Tested Xmas tree Facility Pt Mac 2 Progress Report Well P2-52 Rig Doyon 14 Page 4 Date 18 February 98 Date/Time 08 Dec 97 19:00-19:15 19:15-20:00 20:00-00:00 00:00-03:00 03:00-03:15 03:15-04:00 Duration 1/4 hr 3/4 hr 4 hr 3 hr 1/4 hr 3/4 hr Activity Freeze protect well - 57.000 bbl of Diesel Removed Hanger plug Freeze protect well - 258.000 bbl of Diesel Set packer at 11960.0 ft with 2500.0 psi Rigged up Accessories Rigged down Drillfloor / Derrick SENT BY:~ESSAGE CENTER ; 8-80-88 ; 4'88P~I ; ARCO PBOC~ 807 ·~ EL Well Work Log '"'~-.. Date " ' :De~cripti°n ' ' ' OS:Well 1130108 GR/CCL & INITIAL PERFS (IN PROGRESS) P2-52 ~=I'PiiTP PSI " IA Pa ' UA P~I ' 'I$iTP' J'Min ID $~SV nipple " NA ZERO ZERO . ! 61,0 psiJ 3.,,725"~;~12003 CAMCO BAL-O 'SSSV'lnfor~ation ' TUbular or Casing Problems Pi~TD OOH 12331' CIE ~ 'SWS ~E#2 ~)}~)r) CiE sws ~,~o~ I~/l~ , Time ~ En~ ' ' ~:00 MIRU SW~ UNIf 8293; ENG: JOHNSON ...... 10:~ -'PRESURE TEST' ~OP/RISER TO 3~ ' ' ' ..... ~o:~s ~H W~TH ~ ~R/b~L-CC~ ........... 11:20 TIE' INTO SPERRY G'~CNb DATED 11~7 .... i6:40 TAG TD ~ 12331' RK8 .......... - 10:41 LOG G~/ccL TIE IN/JEWELRY LOG ....... - ~o:so .OoH ................ ~ 12:20 AT SURFACE, RIG UP ~O' G0N ........... ~:15 ''~ RiH WITH CCTV0' 3 3i8" HSb,6 SPF PER~ GUN ....... .., ., , ,., 1~:30' ' TIE 1~O G~CC~- LOG TIE IN ST~tP ' i4:48 'SHOOT 123~-'~2325', SI~P tMMEDIA~ELY'i~CREASED ~O 600 ~SI, ' '" 14:55 POOH. ASF. 16;30' RIH WITH CC~ 3 318" HSD,6 SPF P~RF ~'UN ......... ~7~s0 SHOOT ~2~S~.~230~. Nd~N~E ~N'S~.(-~0 PS0".~ "' ~, .. ' ' , ' 19;00 OOH, ASF. RIG D0'~ FOR NIGHT . . ,,, , . = ,, _~.= , ..... ,, , . ,= , ,, . . , ~,,, , = -~ . ,, ,,, .~= ..~'. ~. - ~ .~, , ., ., ,~ , , ,=. ; = --- .,, , = ~ J · ,, ,, , .. - , , , , ,,. ,, , . ,. ,~ ,, ~ , · , ~ , ,, II II II "11 ~ ~ .. I _ I II ~ , , ., , , ~., , · ; . ,, - ~HOT 40' OF INITIAL P~RFS (12285'-12325') W/ :~AG'D PBTD ~ 123~1' INITIALLY BUT ON A~ER 1ST GUN'RUN TAG',D ~ .12328' ELM, -PErFoRMED GR/CCE J~ELRY L~G ON'FIRST TRIP ~N THE HOLE: TBG TAIL FOUND ~ 120~ I' ELM ~ " '" " ~ m " ' "'"' ' ' ' "' ' ' Pe~omflng In ~1 HCS de~) & Gun Info,.{inse~:mOm~lin~.as.nec~sa~) ' , , , ,' ,, .,~ ,,,, ,, , ... Top (fi) ao~m SPF ~mmalEH~P ,P~aaing oHe~ Ol~U Zone .... Adl~epe~" 12285 12325 6 20.~,4~1,9 ~ ~NDOM B LC1 INITIAL ., , , ,, I I I I ~.. --. ~ '" . P:or IPROF: Weii m~.(a~ch'W~30). SBHPS. · . .... '.::.:::..?'~:Ru~"in.'.~Q,s.. . .., ,,,, . , __ {L ,~ PN~.e~),,, '.: .':,..;: BOPD: " F~TP: MD: ..... N~ flui~ Pumped and bbls ~hind ' .. ' ' SS: pipe i~ "log ent~' se~on next to e~ch Tot-Gas: GOR:.~ , , : ........... BWPD: WC (%): Press: p?s made o~o ' Ch ' ' p': ' as: oke ~- Tern I II I II I~ II L Signed .~ [Page No. ~ ' SENT BY:MESS^GE CENTER ; 8-80-98 ; 4'88PM ; AI~CO PBOC~ 907 864 5198;# 2/ 8 · -. EL Well Work Log Date '. Description ..... D$.We'l~ -'- 1/3119B INITIAL PERF~ (IN PROGRE~) P2-~ ~IiTP ps~" lA PSI" DA ~S, iS~ "I~i~,O '- sSsv nip,,, NA ZERO ZERO[ 610psi [ ~:~5"~.2003 CAMCO BAL-O S~$v Inf0~ation ..... Tubular or Casing Pmbiems PBTD OOH NtA NO TAG c/;~ , sws ~~ c~ ..... C~E~ 'C~E~ "' S~ $17,~3 -Diesel (Recov.) Di~ei (non Recov) AFE ~ .... C~" ' ICe'ss ' Activi~" ' Time ' .. Log Ent~ ' - 07:30" MIRu SWS'UNIT 8293; ENG: JOHNSON .... 09:00 PRESURE TEST BOP/RISER TO 30D~ 0~':15 RIH ~mH cC~O' 3'3/8" HSD,0 sPF pERF'~UN ..... 10:15 TIE INT0 GR/CCL DATED 1~0t98 ~o:24 S~OOT'~-'~ .... - ~ " '12:05 RIH WITH'CC~ff 3 3~" HSD,6 SPF PE~ GUN ................ 13:04 SHOOT 1220~ - 12220 1~:40 RIH W~H cCu20' 3 3ffi" HSD,0 SP~ PERF'GuN "' ~5:35 ~HOOT 1218~- 12200 ............ 1'~:00 RIH WITH cC~o;~ 318" HSD,6 SPF pERF GUN ........... 1~:59 SHOO~T 12~60- 1~180 ......... ~9:00 ~T SU'~FACE, RIG DO~ F~R NIGHT ...... 19;~0 L~vE LOCATION ......... , ,,,, ,. -. ~. , , , .,~ , . ., - - ,L I . ' " ,, .,; ,,~ ., , ,, , ,, .... ~, , , , ., , ,,, , _.,, ,= ._, ,, _, ,, . ,, ..,,, . ,,, . _,, , = ,, _ · ,. ~ ,, , , ~, , ~ ,,, , I I II II II a~H II ~ ReSui~ Summa~ -Add~s ~h objecti~ Ils~d' in Jab mqu~t .e, g;"aPti~l':G~.ple~,, ch~nels, ~. -. · - ..- .': ~ . ,, , , · , , ., - SHOT ADD'L 80' OF INmAL ~ERFs W/3-~" HSD, ~B HJII, 6 SPF, 60 DEG .. . ALL RuNS WERE' SHOT' BA~NCED (ONLY SLIGHT INCR~SE IN SIWHP ON RUN ~; 61~6~ PSi) ' ., , ,, ...... , ,, _ = -- . = _. ,,, ,. , III ... II . . [ I . Ill .... I . I -:' ' " d~ting In~ (BH~ de~a) & G~'lnfo,.{i~e~ mem;tia~.aS.n~sa~.)'. -- ".:'.-.'::.:...:-.--.::.~:.~ J ,= , , ~ ~ H, ~ ,,, ' ~..~ ' ' ' ' ToP (~ Bo~m "~pF Gmm=~HD~ P~sin9 OHent O~U . ~ne ..... AdlRo~ ..... 1~65 12285 6 ' 20.6~.4~1.9 ~ RAN~'M B LB2,1 INITIAL · 12160 ' 1~00 " 6 ' 20.~.4~1.9 60 RANDOM "'B UB1,~2,t INITIAE I I I I III .... I I I .. I ...... P or IPROF: Well m~ (a~ch ~30) ,.. 'SBHPS ' "..'. ::.':':~.:.:::;~ ..:~:"::':::'..::...::~ur~th.~'Eog=..(LDL~:'PN~:'e~4.::.~-..-':~::'::"..;:~ ,., , i, i , i1,~ .,, '" , ,~' '. ........ --' BOPD: FIITP: MD~ " No~ fluid p~ped and bbls behind 6WPD: " Wc (%):" Press: "' ~s m~do ' GL Gas: Choke" Tem~: ~ III . Signed Page NO. of . Gtra~JM~ for ~n ~e.~,~ .... I_., 1 ~ -- .... r EL Well Work Log Date Descd ption DS-Well 2/01/98 INITIAL PERFS P2-S2 FTPilTP PSi ' ' 'l~'P~] ' OA Psi ISITP I.Mln ID ' SSSV nipple"' NA ZERO ZERO I 64{3 psi ! 3.725"~12003 CAMCO BAL-O SSSV Information " Tubular or Casing J=roblems ' PBTD - OOH N/A 12328' CIE #1 SWS ~ ~IE#2 CIE/t3 CIE ~4 C/E #8 SWS $11,073 Diesel ,Recov.) Diesel' ,non'Rocov) AFL# v//- CC# lC~.~,i~' Activity ,,, 2C0109 P___M_....D_ S009DH · ~."~ '~-_ Time Log Entr~ 07:15 MIRU SWS UNIT 8~g3; LNG: JOHNSON 08:t5 PRESURE TE~T BOP/RISER TO 3000~t 08:15 Ril~ WITH CCL/20' 3 318" HSD,6 SPF PERF GuN ., 09:05" TIE-iNTO GR/CCL DATED 1/30/g8 09:'1~ SHO6T 12140- 12160 ........ 10:45 RIH WITH CCL~2'0;'3 3/8" HSD,0 SPF PERF GUN 11:43 s-HooT 12120'.':12140 ........ 12:40 RIG DOWN 13:3~-" I~IOVE TO P2-.40 , - .... ,,, ,, . q 'IL... · · .... , 1,, _ ,=,., ,.~_ . ---, _ il., ..~ , · m,, II I . I II I I . I Reeults Summary - Adci'~ess each objective listed in Job request - e, g, splits, GCC pick, channels, etc. - SHOT FINAL 413' OF INI'I:i'AL PERES (12120'-60')-~/3-3/8" HSD, 34l~ HJII, 6 SPF, 60 BEG ' --, ....... ''t ": --. . -- --~l, JL .. il I.I I[l_. .1111 II .... J Pe. rforatJng Interval (BHCS depths) & Gun info, (lneert more lines.a~i~essary) Top (ft) Bottom SPF GmmslEHD/TTP Phasing Orient O/B/U Zone AdtReperf .,. _ 1,-_._ , . __ ,,.. 12120 12160 6 20.510.4/'Z1.9 60 RANDOM B UB1,LC3,2 INITIAL . I I II I III I I I ~ or IPROF: Well rate (a.tt~, ch WS30) _. _. SBHPS ... _ ':'i~ump...,.,In Log= (LDL, PNL, .... etc.) BOpD: F/ITP: MD: Note fluid pumped ~nd bbls behind Tot. Gas: GOR: SS: )ipe in "icg entry' section next to each BWPD:. WC (%): Press: l~ass made GL Gas: Choke °' Tem~): II _ III i I I A Gyroda t a D i r e c t i ona i Survey for Job Number: Al197GOO430 Run Date: ~ 00:00:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.400000 deg. N ARCO ALASKA INC. DRILLSITE P2, WELL NO. P2-52 POINT MCINTYRE, ALASKA Sub-sea Correction from Vertical Reference: 47 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 95.346 deg Vertical Section Calculated from Well Head Location RECEIVED J4N 2 0 1998 BPXA PDO Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference ARCO ALASKA INC. DRILLSITE P2, WELL NO. POINT MCINTYRE, ALASKA Job Number: Al197GO0430 A G y r o d a t P2-52 a D i r e c t i o n a i Survey Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 100.0 .89 128.34 100.0 197.0 .58 156.50 197.0 254.0 .51 184.63 254.0 343.0 .12 314.73 343.0 0.0 .7 1.5 1.7 1.6 .00 0.0 0.0 .89 .8 128.3 .48 2.0 135.1 .48 2.4 142.1 · 67 2.6 148.2 0.00 N 0.00 E .48 S .61 E 1.40 S 1.40 E 1.92 S 1.49 E 2.24 S 1.39 E 435.0 .32 285.61 435.0 522.0 .35 295.05 522.0 610.0 .50 294.51 610.0 704.0 .88 155.89 704.0 795.0 1.82 149.39 795.0 1.3 .8 .2 .1 1.3 .24 2.4 152.9 .07 2.0 162.7 .17 1.7 179.8 .38 2.1 181.9 .05 4.1 166.7 2.11 S 1.08 E 1.93 S .60 E 1.65 S .01 E 2.14 S .07 W 4.02 S .95 E 883.0 2.83 163.60 882.9 973.0 3.27 168.15 972.8 1064.0 3.99 163.35 1063.6 1160.0 4.48 157.24 1159.3 1202.0 4.39 154.75 1201.2 2.9 4.5 6.5 9.5 11.1 .31 7.7 162.7 .56 12.4 164.0 .86 18.2 164.5 .69 25.3 163.3 .51 28.5 162.4 7.31 S 2.27 E 11.95 S 3.43 E 17.52 S 4.87 E 24.18 S 7.28 E 27.15 S 8.60 E 1254 . 0 5 . 41 150 . 02 1253 . 0 1296.0 5.73 150.48 1294.8 1350.0 6.40 146.30 1348.5 13.5 15.9 19.3 2.10 32.9 161.0 .78 36.9 159.9 1.48 42.5 158.3 31.07 S 10.67 E 34.61 S 12.69 E 39.46 S 15.69 E Final Station Closure: Distance: 42.47 ft Az: 158.32 deg. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING PT MACINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 MWD SURVEY JOB NUMBER: AKMM80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 1350.00 1348.44 1301.19 6 24 S 33..70 E .00 1392.00 1390.18 1342.93 6 25 S 29.61 E 1.09 1486.52 1483.97 1436.72 7 43 S 33.20 E 1.45 1582.97 1579.47 1532.22 8 22 S 27.88 E 1.02 1678.21 1673.54 1626.29 9 31 S 32.83 E 1.44 39.50S 15.70E 19.31 43.49S 18.16E 22.14 53.41S 24.26E 29.13 65.05S 31.09E 37.02 77.81S 38.61E 45.70 1773.79 1767.75 1720.50 9 53 S 31.81 E .43 1868.82 1860.93 1813.68 12 44 S 39.39 E 3.38 1933.05 1923.55 1876.30 13 0 S 44.15 E 1.70 1996.12 1985.01 1937.76 12 55 S 49.66 E 1.96 2059.11 2046.40 1999.15 12 59 S 56.62 E 2.48 91.42S 47.22E 55.54 106.46S 58.18E 67.85 117.12S 67.70E 78.33 126.77S 78.02E 89.50 135.22S 89.30E 101.52 2122.65 2108.32 2061.07 12 58 S 59.86 E 1.15 2t86.63 2170.59 2123.34 13 30 S 63.07 E 1.43 2249.72 2231.78 2184.53 14 40 S 65.49 E 2.06 2313.79 2293.60 2246.35 15 48 S 70.07 E 2.59 2376.66 2354.03 2306.78 16 10 S 72.90 E 1.37 142.73S 101.43E 114.29 149.72S 114.30E 127.76 156.38S 128.14E 142.16 162.72S 143.73E 158.27 168.21S 160.14E 175.13 2471.93 2445.38 2398.13 16 49 S 68.88 E 1.38 2567.05 2536.16 2488.91 17 54 S 64.33 E 1.83 2661.72 2625.78 2578.53 19 40 S 65.59 E 1.91 2756.39 2714.37 2667.12 21 34 S 67.12 E 2.09 2852.41 2803.33 2756.08 22 38 S 71.34 E 1.99 177.08S 185.68E 201.38 188.37S 211.70E 228.34 201.26S 239.33E 257.05 214.61S 269.87E 288.71 227.39S 303.64E 323.52 2945.89 2888.85 2841.60 24 55 S 70.50 E 2.47 3041.18 2974.62 2927.37 26 43 S 67.95 E 2.22 3136.10 3058.96 3011.71 27 53 S 66.'21 E 1.49 3231.75 3142.67 3095.42 29 57 S 66.06 E 2.16 3326.46 3223.55 3176.30 32 44 S 64.16 E 3.12 239.72S 339.25E 360.13 254.46S 378.03E 400.11 271.43S 418.13E 441.61 290.14S 460.42E 485.47 310.90S 505.09E 531.87 3389.76 3276.35 3229.10 34 10 S 65.37 E 2.51 3452.53 3328.15 3280.90 34 35 S 67.53 E 2.06 3516.34 3380.53 3333.28 35 4 S 69.68 E 2.06 3579.96 3432.48 3385.23 35 27 S 71.11 E 1.43 3674.50 3508.17 3460.92 38 9 S 73.18 E 3.14 325.77S 536.66E 564.69 339.93S 569.15E 598.37 353.22S 603.08E 633.39 365.54S 637.68E 668.99 382.87S 69t.58E 724.27 3769.49 3581.23 3533.98 41 17 S 75.56 E 3.68 3864.21 3652.50 3605.25 41 5 S 75.41 E .24 3959.82 3724.15 3676.90 41 49 S 76.03 E .87 4055.88 3795.53 3748.28 42 10 S 74.94 E .85 4150.25 3864.45 3817.20 43 59 S 77.50 E 2.67 399.18S 750.04E 783.99 414.82S 810.44E 845.59 430.43S 871.79E 908.12 446.54S 934.01E 971.57 461.87S 996.60E 1035.32 P, ECEiV U SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PT M~CINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 MWD SURVEY JOB NUMBER: AKMM80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 4245.80 3930.80 3883.55 48 1 S 79.32 E 4.43 4340.33 3992.61 3945.36 50 17 S 80.86 E 2.71 4434.97 4052.85 4005.60 50 38 S 81.32 E .52 4530.11 4113.87 4066.62 49 33 S 80.92 E 1.18 4625.37 4175.23 4127.98 50 14 S 81.32 E .78 475.64S 1063.92E 1103.64 487.93S 1134.35E 1174.91 499.23S 1206.47E 1247.76 510.50S 1278.58E 1320.61 521.74S 1350.57E 1393.33 4719.32 4235.52 4188.27 49 54 S 81.83 E .54 4813.62 4297.16 4249.91 48 27 S 81.35 E 1.59 4908.11 4359.95 4312.70 48 14 S 82.40 E .86 5002.57 4422.44 4375.19 48 55 S 80.69 E 1.54 5097.62 4483.10 4435.85 51 46 S 79.43 E 3.17 532.30S 1421.84E 1465.28 542.73S 1492.43E 1536.54 552.71S 1562.33E 1607.05 563.13S 1632.38E 1677.78 575.78S 1704.45E 1750.71 5192.95 4541.75 4494.50 52 16 S 79.40 E .54 5288.45 4600.43 4553.18 51 54 S 79.55 E .42 5383.97 4659.88 4612.63 51 7 S 80.'23 E .99 5480.03 4720.65 4673.40 50 23 S 81.32 E 1.16 5576.47 4782.29 4735.04 50 9 S 80.03 E 1.06 589.58S 1778.32E 1825.54 603.35S 1852.39E 1900.58 616.47S 1926.00E 1975.08 628.40S 1999.42E 2049.30 640.42S 2072.61E 2123.29 5671.38 4843.32 4796.07 49 49 S 80.69 E .64 5766.37 4904.42 4857.17 50 6 S 80.48 E .35 5798.67 4925.18 4877.93 49 54 S 81.22 E 1.86 5887.51 4982.71 4935.46 49 22 S 80.31 E .99 5980.77 5043.44 4996.19 49 21 S 80.42 E .09 652.59S 2144.27E 2195.77 664.49S 2216.02E 2268.32 668.42S 2240.45E 2293.01 679.28S 2307.26E 2360.55 691.13S 2377.04E 2431.12 6076.37 5105.77 5058.52 49 15 S 80.38 E .11 6171.54 5167.35 5120.10 50 5 S 80.63 E .89 6265.97 5227.40 5180.15 50 55 S 81.21 E 1.01 6361.66 5287.52 5240.27 51 13 S 81.50 E .39 6457.62 5347.97 5300.72 50 40 S 83.00 E 1.34 703.22S 2448.51E 2503.41 715.18S 2520.07E 2575.77 726.68S 2592.03E 2648.49 737.87S 2665.63E 2722.82 747.93S 2739.47E 2797.27 6554.42 5409.02 5361.77 51 7 S 86.19 E 2.60 6648.47 5468.05 5420.80 51 7 S 86.15 E .04 6744.33 5528.13 5480.88 51 15 S 85.65 E .43 6838.44 5586.68 5539.43 51 47 S 87.60 E 1.72 6932.22 5644.14 5596.89 52 38 S 87.12 E .99 754.99S 2814.23E 2872.36 759.88S 2887.28E 2945.55 765.22S 2961.79E 3020.23 769.56S 3035.32E 3093.85 772.97S 3109.36E 3167.88 7027.66 5702.59 5655.34 51 49 S 88.29 E 1.30 7123.01 5761.07 5713.82 52 31 S 89.40 E 1.18 7217.69 5819.52 5772.27 51 13 S 89.07 E 1.41 7313.71 5879.26 5832.01 51 49 S 88.58 E .74 7409.58 5938.83 5891.58 51 20 S 87.43 E 1.06 776.00S 3184.73E 3243.21 777.51S 3260.03E 3318.32 778.50S 3334.50E 3392.56 780.05S 3409.65E 3467.53 782.66S 3484.72E 3542.51 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PT MACINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 MWD SURVEY JOB NUMBER: AKMM80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 7505.20 5998.97 5951.72 50 42 S 88.57 E 1.15 7600.05 6058.14 6010.89 52 5 N 89.98 E 1.90 7694.89 6116.35 6069.10 52 10 N 89.43 E .47 7789.76 6175.54 6128.29 50 35 N 88.31 E 1.90 7884.59 6235.08 6187.83 51 37 N 87.62 E 1.22 785.26S 3559.00E 3616.72 786.16S 3633.11E 3690.59 785.77S 3707.99E 3765.10 784.32S 3782.10E 3838.75 781.70S 3855.86E 3911.94 7979.33 6293.79 6246.54 51 47 N 88.97 E 1~13 8074.93 6353.96 6306.71 50 11 N 89.05 E 1.68 8170.11 6414.35 6367.10 51 2 N 88.64 E .96 8266.00 6474.24 6426.99 51 38 N 88.11 E .75 8361.44 6533.81 6486.56 51 7 N 89.41 E 1.19 779.48S 3930.17E 3985.73 778.20S 4004.44E 4059.55 776.72S 4077.99E 4132.65 774.59S 4152.84E 4206.97 772.97S 4227.39E 4281.05 8456.48 6592.80 6545.55 52 7 N 88.99 E 1.10 8551.81 6651.54 6604.29 51 48 N 89.22 E .38 8647.51 6711.05 6663.80 51 17 N 89.99 E .83 8743.17 6770.61 6723.36 51 42 S 89.87 E .44 8838.17 6829.47 6782.22 51 43 N 89.71 E .35 771.93S 4301.89E 4355.12 770.76S 4376.96E 4429.76 770.24S 4451.91E 4504.33 770.32S 4526.77E 4578.87 770.21S 4601.33E 4653.10 8932.79 6887.57 6840.32 52 31 N 89.58 E .85 9027.08 6945.77 6898.52 51 14 N 89.45 E 1.36 9122.24 7004.84 6957.59 52 1 N 89.32 E .83 9217.49 7063.38 7016.13 52 7 N 89.56 E .23 9313.00 7122.14 7074.89 51 55 N 88.85 E .62 769.75S 4676.01E 4727.41 769.12S 4750.18E 4801.20 768.32S 4824.78E 4875.40 767.59S 4899.91E 4950.14 766.54S 4975.20E 5025.00 9408.56 7181.29 7134.04 51 35 N 87.87 E .88 9508.28 7243.44 7196.19 51 18 N 87.49 E .41 9607.80 7305.78 7258.53 51 6 N 87.28 E .26 9705.35 7365.93 7318.68 52 45 N 87.57 E 1.70 9800.30 7423.48 7376.23 52 37 N 89.57 E 1.68 764.40S 5050.22E 5099.49 761.24S 5128.14E 5176.78 757.70S 5205.63E 5253.60 754.26S 5282.34E 5329.66 752.37S 5357.83E 5404.64 9896.07 7481.74 7434.49 52 25 N 89.59 E .21 9991.65 7540.22 7492.97 52 7 N 88.98 E .59 10086.17 7597.71 7550.46 52 56 N 89.15 E .87 10179.72 7654.38 7607.13 52 29 N 88.10 E 1.01 10274.24 7712.49 7665.24 51 37 N 87.49 E 1.04 751.81S 5433.84E 5480.26 750.87S 5509.44E 5555.45 749.65S 5584.45E 5630.02 747.86S 5658.85E 5703.93 745.00S 5733.34E 5777.83 10369.78 7771.61 7724.36 51 55 N 88.71 E 1.05 10465.59 7830.24 7782.99 52 36 N 88.81 E .73 10560.30 7888.17 7840.92 51 58 N 87.47 E 1.30 10654.65 7946.65' 7899.40 51 24 N 87.18 E .65 10750.94 8006.72 7959.47 51 24 N 88.23 E .85 742.51S 5808.35E 5852.28 740.87S 5884.10E 5927.55 738.44S 5958.99E 6001.88 734.99S 6032.94E 6075.19 731.97S 6108.14E 6149.78 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PT MACINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 MWD SURVEY JOB NUMBER: AKMM80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10846.30 8065.87 8018.62 51 55 S 89.81 E 1.70 10941.58 8125.15 8077.90 51 7 S 89.97 E .84 11036.71 8184.15 8136.90 52 12 N 89.54 E 1.21 11133.57 8244.23 8196.98 51 5 N 89.59 E 1.15 1t228.95 8304.19 8256.94 51 0 S 89.19 E 1.00 730.95S 6182.91E 6224.13 731.09S 6257.50E 6298.41 730.81S 6332.12E 6372.68 730.23S 6408.08E 6448.26 730.49S 6482.26E 6522.13 11324.90 8363.99 8316.74 51 54 'S 89.80 E 1.06 11419.97 8423.03 8375.78 51 19 N 89.78 E .70 11516.14 8483.51 8436.26 50 44 N 89.61 E .62 11611.83 8544.78 8497.53 49 37 N 89.16 E 1.22 11707.13 8606.40 8559.15 49 47 S 89.36 E 1.20 731.15S 6557.29E 6596.90 731.14S 6631.80E 6671.08 730.74S 6706.57E 6745.49 729.95S 6780.06E 6818..59 729.83S 6852.75E 6890.95 11802.39 8668.49 8621.24 48 50 S 89.66 E 1.02 11895.35 8731.70 8684.45 45 27 N 87.92 E 4.12 11992.15 8800.06 8752.81 44 41 N 84.77 E 2.44 12087.55 8869.75 8822.50 41 26 N 83.62 E 3.50 12182.54 8940.80 8893.55 41 43 N 84.'32 E .58 730.45S 6924.99E 6962.93 729.45S 6993.t2E 7030.67 725.10S 7061.49E 7098.34 718.53S 7126.29E 7162.24 711.91S 7188.99E 7224.05 12277.44 9010.31 8963.06 44 5 N 82.37 E 2.85 12372.60 9077.96 9030.71 45 16 N 82.26 E 1.25 12467.68 9145.85 9098.60 43 34 N 82.92 E 1.86 12520.00 9184.06 9136.81 42 37 N 83.30 E 1.86 704.40S 7253.15E 7287.23 695.45S 7319.46E 7352.42 686.86S 7385.45E 7417.32 682.57S 7420.94E 7452.25 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 7452.26 FEET AT SOUTH 84 DEG. 44 MIN. EAST AT MD = 12520 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 95.35 DEG. TIE-IN SURVEY AT 1,350.00' MD FROM GYRODATA SURVEYS PROJECTED SURVEY AT 12,520.00' MD SPERRY-SUN DRILLING SERVICES ANCHORAGE ALJtS KA PAGE 5 SHARED SERVICES DRILLING PT MACINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 JOB NUMBER: A~80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 1350.00 1348.44 1301.19 39.50 S 15.70 E 1.56 2350.00 2328.43 2281.18 166.03 S 153.05 E 21.57 20.01 3350.00 3243.35 3196.10 316.45 S 516.54 E 106.65 85.08 4'350.00 3998.79 3951.54 489.11 S 1141.70 E 351.21 244.56 5350.00 4638.56 4591.31 611.98 S 1899.93 E 711.44 360.23 6350.00 5280.22 5232.97 736.53 S 2656.64 E 1069.78 358.34 7350.00 5901.69 5854.44 780.75 S 3438.17 E 1448.31 378.52 8350.00 6526.63 6479.38 773.07 S 4218.49 E 1823.37 375.07 9350.00 7144.96 7097.71 765.96 S 5004.32 E 2205.04 381.67 10350.00 7759.41 7712.16 742.86 S 5792.78 E 2590.59 385.55 11350.00 8379.48 8332.23 731.22 S 6577.04 E 2970.52 379.93 12350.00 9062.06 9014.81 697.61 S 7303.55 E 3287.94 317.42 12520.00 9184.06 9136.81 682.57 S 7420.94 E 3335.94 48.00 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 SHARED SERVICES DRILLING PT MACINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 JOB NUMBER: AKMM80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC iNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULA/{ COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 1350.00 1348.44 1301.19 1449.46 1447.25 1400.00 1550.41 1547.25 1500.00 1651.55 1647.25 1600.00 39.50 S 15.70 E 49.25 S 21.53 E 60.86 S 28.88 E 74.10 S 36.22 E 1.56 2.21 .65 3.16 .94 4.30 1.15 1752.98 1747.25 1700.00 1854.81 1847.25 1800.00 1957.37 1947.25 1900.00 2059.98 2047.25 2000.00 2162.62 2147.25 2100.00 88.38 S 45.34 E 104.11 S 56.28 E 121.01 S 71.54 E 135.33 S 89.46 E 147.17 S 109.32 E 5.73 1.43 7.56 1.83 10.12 2.57 12.73 2.61 15.37 2.64 2265.71 2247.25 2200.00 2369.60 2347.25 2300.00 2473.88 2447.25 2400.00 2578.70 2547.25 2500.00 2684.52 2647.25 2600.00 158.06 S 131.82 E 167.63 S 158.26 E 177.28 S 186.21 E 189.92 S 214.93 E 204.43 S 246.32 E 18.46 3.08 22.35 3.89 26.63 4.29 31.45 4.82 37.27 5.82 2791.75 2747.25 2700.00 2900.09 2847.25 2800.00 3010.54 2947.25 2900.00 3122.85 3047.25 3000.00 3237.05 3147.25 3100.00 219.66 S 281.86 E 233.36 S 321.21 E 249.29 S 365.26 E 268.93 S 412.45 E 291.24 S 462.86 E 44.50 7.23 52.84 8.34 63.29 10.44 75.60 12.31 89.80 14.20 3354.68 3247.25 3200.00 3475.74 3347.25 3300.00 3598.17 3447.25 3400.00 3724.79 3547.25 3500.00 3857.25 3647.25 3600.00 317.55 S 518.89 E 344.94 S 581.35 E 368.94 S 647.77 E 391.67 S 721.98 E 413.67 S 806.01 E 107.43 17.63 128.49 21.06 150.92 22.43 177.54 26.62 210.00 32.46 3990.82 3747.25 3700.00 4126.35 3847.25 3800.00 4270.39 3947.25 3900.00 4426.15 4047.25 4000.00 4581.67 4147.25 4100.00 435.42 S 891.85 E 458.28 S 980.39 E 479.03 S 1081.88 E 498.20 S 1199.72 E 516.66 S 1317.39 E 243.57 33.57 279.10 35.53 323.14 44.04 378.90 55.76 434.42 55.52 4737.53 4247.25 4200.00 4889.04 4347.25 4300.00 5040.79 4447.25 4400.00 5201.93 4547.25 4500.00 5363.85 4647.25 4600.00 534.28 S 1435.63 E 550.83 S 1548.23 E 567.98 S 1661.05 E 590.89 S '1785.30 E 613.81 S 1910.56 E 490.28 55.86 541.79 51.51 593.54 51.75 654.68 61.14 716.60 61.92 5521.75 4747.25 4700.00 633.27 S 2031.19 E 774.50 57.90 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 7 SHARED SERVICES DRILLING PT MACINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 JOB NUMBER: AKMM80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 5677.48 4847.25 4800.00 5832.94 4947.25 4900.00 5986.62 5047.25 5000.00 6140.20 5147.25 5100.00 6297.46 5247.25 5200.00 653.34 S 2148.86 E 672.43 S 2266.35 E 691.87 S 2381.41 E 711.27 S 2496.35 E 730.42 S 2616.19 E 830.23 55.73 885.69 55.46 939.37 53.68 992.95 53.59 1050.21 57.25 6456.49 5347.25 5300.00 6615.33 5447.25 5400.00 6774.88 5547.25 5500.00 6937.35 5647.25 5600.00 7100.30 5747.25 5700.00 747.82 S 2738.60 E 758.15 S 2861.54 E 767.03 S 2985.55 E 773.18 S 3113.43 E 777.32 S 3242.01 E 1109.24 59.03 1168.08 58.84 1227.63 59.55 1290.10 62.46 1353.05 62.95 7262.00 5847.25 5800.00 7423.06 5947.25 5900.00 7582.31 6047.25 6000.00 7745.08 6147.25 6100.00 7904.19 6247.25 6200.00 779.08 S 3369.06 E 783.13 S 3495.23 E 786.16 S 3619.12 E 785.29 S 3747.53 E 781.06 S 3871.21 E 1414.75 61.71 1475.81 61.06 1535.06 59.26 1597.83 62.76 1656.94 59.11 8064.45 6347.25 6300.00 8222.54 6447.25 6400.00 8382.86 6547.25 6500.00 8544.87 6647.25 6600.00 8705.50 6747.25 6700.00 778.33 S 3996.39 E 775.69 S 4118.81 E 772.80 S 4244.07 E 770.83 S 4371.51 E 770.25 S 4497.21 E 1717.20 60.25 1775.29 58.10 1835.61 60.32 1897.62 62.01 1958.25 60.63 8866.87 6847.25 6800.00 9029.44 6947.25 6900.00 9191.21 7047.25 7000.00 9353.70 7147.25 7100.00 9514.38 7247.25 7200.00 9674.49 7347.25 7300.00 9839.46 7447.25 7400.00 10003.11 7547.25 7500.00 10168.01 7647.25 7600.00 10330.29 7747.25 7700.00 770.10 S 4623.86 E 769.11 S 4752.02 E 767.75 S 4879.17 E 765.88 S 5007.23 E 761.03 S 5132.90 E 755.30 S 5257.80 E 752.14 S 5388.95 E 750.71 S 5518.48 E 748.17 S 5649.57 E 743.21 S 5777.27 E 2019.62 61.37 2082.19 62.57 2143.96 61.77 2206.45 62.49 2267.13 60.68 2327.24 60.11 2392.21 64.97 2455.86 63.65 2520.76 64.90 2583.04 62.28 10493.60 7847.25 7800.00 10655.61 7947.25 7900.00 10816.11 8047.25 8000.00 10976.80 8147.25 8100.00 11138.37 8247.25 8200.00 740.41 S 5906.35 E 734.95 S 6033.69 E 730.87 S 6159.15 E 731.10 S 6284.93 E 730.21 S 6411.82 E 2646.35 63.31 2708.36 62.02 , 2768.86 60.50 2829.55 60.69 2891.12 61.57 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 8 SHARED SERVICES DRILLING PT MACINTYRE / P2-52 500292282600 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/19/97 DATE OF SURVEY: 120397 JOB NUMBER: AKMM80023 KELLY BUSHING ELEV. = 47.25 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 11297.77 8347.25 8300.00 731.07 S 6535.94 E 2950.52 59.40 11458.72 8447.25 8400.00 731.02 S 6662.05 E 3011.47 60.94 11615.65 8547.25 8500.00 729.91 S 6782.97 E 3068.40 56.93 11770.11 8647.25 8600.00 730.30 S 6900.68 E 3122.86 54.46 11917.51 8747.25 8700.00 728.88 S 7008.91 E 3170.26 47.41 12057.27 8847.25 8800.00 720.71 S 7106.14 E 3210.02 39.76 12191.20 8947.25 8900.00 711.32 S 7194.74 E 3243.95 33.93 12328.97 9047.25 9000.00 699.62 S 7288.76 E 3281.72 37.77 12469.61 9147.25 9100.00 686.70 S 7386.77 E 3322.36 40.63 12490.00 9162.03 9114.78 684.96 S 7400.72 E 3327.97 5.62 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATrN: Sherrie NO. 11761 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area 1/29/98 1-~o~ Floppy Well Job # Log Description Date BL RF Sepia Disk P2-25 PRODUCTION PROFILE 971 231 1 1 P2-52 RFT 971 203 I 1 SIGNED: _ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ri I:! I I__1__ I IM [~ c~ IE I=t ~/I !-- I::: S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs P2-52, AK-MM-80023 December 23, 1997 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P2-52: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22826-00 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22826-00 2"x 5"MD Neutron & Density Logs: 50-029-22826-00 2" x 5" MD Neutron & Density Logs: 50-029-22826-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia -r 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company r'l I::t I I_ I_. I I~1 G S E !::! ~.~ I r' I::: S 19-Dec-97 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well P2-52 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 1,350.00' MD n/a' MD 12,520.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company · . m F:! I I_1_ I IM Oi S ~:: FI~./I r- E S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Drive. '-" ~ Anchorage, Alaska 99501 j;~ -'~ -~ '~" .,-~ \~ ~ MWD Formation Evaluation Logs - ?2-52, AK-MM-80023 December 17, 1997 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22826-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company .. " ' TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 October 29, 1997 Steve Shultz Senior Drilling Engineer ARCO Alaska, [nc,. P O Box 196612 Anchorage, AK 99519-6612 Re: Point McIntyre P2-52 ARCO Alaska, Inc. Permit No. 97-20l Sur. Loc. 523'SNL, 1245'EWL, Sec. 14, T12N, R14E, UM Btmnhole Loc. 1230'SNL, 3485'EWL, Sec. 13, T12N, R14E, UM Dear Mr. Shultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may' witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. Jo~ Chairman BY ORDER OF THE COMMISSION dj f/enclosures CC: Department offish & Game, Habitat Section w/o encl. Department of Envinornment Conservation w/o encl. STATE OF ALASKA ALASKA ~.,'fL AND GAS CONSERVATION corv'-cvllSSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [--I Exploratory I--] Stratigraphic Test [] Development Oil [] Re-Entn/ [] DeepenI I-'lService I--! Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan KBE = 47' Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL034624 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 523' SNL, 1245' EWL, SEC. 14, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 1238' SNL, 3159' EWL, SEC. 13, T12N,R14E, UM P2-52 At total depth 9. Approximate spud date Amount $200,000.00 1230' SNL, 3485' EWL, SEC. 13, T12N, R14E, UM 11/01/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 365548, 1230'I P2-51,9.27' at 500' 2560 12546' MD / 9104' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 700' MD Maximum Hole Angle 52° Maximum surface 3420 psig, At total depth (TVD) 8800' / 4300 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 133# H-40 BTC 80' 45' 45' 125' 125' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 5786' 44' 44' 5830' 4947' 1630 sx Coldset Ill, 522 sx'G' 8-1/2" 7" 26# L-80 BTCM-NSCC 11790' 43' 43' 11833' 8619' 256 SX Class 'G' 8-1/2" 7" 29# 13OR/L-80 BTCM-NSCC 713' 11833' 8619' 12546' 9104' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate ProductionRECEIVED Liner i,99T Perforation depth: measured ~lSSkS. 0[~ & Gas Oof~s. true vertical Anchorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diver[er Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greg Hobbs, 564-4191 Prepared By Name/Number: Kathy Campoarnor, 564-5122 21. I hereby certify that th~ true~a~d c~ct to the best of my knowledgeSigned .(~ --.4_ /~)// SteveShu,t~ '-...-t-~.'¢~/,,..~'"~- Title Senior Drilling Engineer Date Commission Use Only Permit Number APl Number I Approval D~.te See cover letter ~',~---.2. c:~/z 50- <~ ~-. ,~ - ~- ;~ ~',~--- ~I Jt-~V/~°~/~l? for other requirements Conditions of Approval: Samples Required []Yes [] No Mud Log Require~l '~/ []Yes j~] No Hydrogen Sulfide Measures J~Yes [] No Directional Survey Required []Yes I--INo Required Working Pressure for BOPE 1--12M; []3M; J~5M; I-I10M; []15M Other: Original S~gned iSy David W. Johnston Commissioner by order of the commission Date Approved By llicate Form 10-401 Rev. 12-01-85 SuE I Well Name: I P2-52 I Type of Well (producer or injector): I Producer ISurface Location: Target Location' Bottom Hole Location: 523' FNL, 1245' FWL, SEC 14, T12N, R14E 1238' FNL, 3159' FWL, SEC 13, T12N, R14E 1230' FNL, 3485' FWL, SEC 13, T12N, R14E IAFE Number: 1 2C0109 Estimated Start Date: 11/1/97 I Rig: I DOYON14 IDays to complete 18 IMD: 112546' I"I"VD: 19104'brtI IRTE: 147' I Well Design (conventional, slimhole, etc.): Ultra-Slimhole 7" Longstring Formation Markers: Formation Tops MD TVD Base of 1788 1782 Permafrost SV1 (-1'3) 5480 4722 9 5/8" Casing 5830 4947 9-5/8" csg shoe below Point SV1 & above K-15 K15 (Ugnu) 6157 5110 West Sak 9068 6967 9.5 ppg minimum mud weight required K-10 11561 8499 9.6-9.9 EMW to this depth. HRZ 14169 8842 K-5/HRZ same depth, swap to 10.5-10.6% 6% KCL. Kalubik 12095 8827 Kuparuk 12133 8850 10.5 ppg Min EMW Kuparuk Zone LA 12406 9018 Miluveach 12465 9054 TD/OWC 12546 9104 7" casing shoe. 140' MD below LA marker Casing/Tubing Pro9 ram: ~r~ y Hole Csg/Tbg Wt/Ft Grade Conn Length Top Btm Size O.D. MD/TVD MD/TVD 30" 20" 133# H40 BTC 80' 45/45' 125'/125' 12 1/4" 9 5/8" 40# L-80 BTC-Mod 5786' 44/44' 5830'/4947' 8 1/2" 7" 26# L-80 BTCM / 11790' 43/43' 11833'/8619' 29# 13CR NSCC 713' 11833'/8619' 12546'/9104' 29# L-80 0' - - Tubing 4 1/2" 12.6# 13CR80 NSCT 12191' 42'/42' 12233'/8912' Mud Program: Surface Mud Properties: Spud 112 1/4" hole section Density (ppg) Funnel Vis Yield Point 10 sec gel 10 min gel pH Fluid Loss 8.7-9.5 100-300 30-70 20-60 40-80 9-10 15 - 25cc Production Mud Properties: LSND 18 1/2" hole section Density (ppg) Plastic Vis Yield Point 10 sec gel 10 min gel pH Fluid Loss 8.8-9.9 8-15 20-30 5-15 < 30 9.0-9.5 4-6cc Production Mud Properties: 6% KCL 18-1/2" hole section Density (ppg) Plastic Vis Yield Point 10 sec 10 min pH Fluid gel ,gel Loss 10.5-10.6 8-15 25-30 12-15 < 30 9.0-9.5 4-6cc Cement Data: Casing First Stage: Second Stage: Comments Sxs/Wt/Yield Sxs/Wt/Yield 9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage iob: casing 651/12.2/1.92 (assumes 200% First stage Coldset III lead to 5830'. excess in from 2000'-4660' @ 50% ES cementer Class G: permafrost) excess followed by Class @ at 2000' 522/15.8/1.1 5 G tail from shoe to 4660' MD. (750' TVD) @ 50% excess + 120' shoe. Second stage Coldset III circulated to surface. Casing/Liner Lead:Sxs/W~ield Tail:Sxs/W~ield Comments 7" none 256/15.8/1.15 Class "G". Volume based on cement to 1000' above the Kuparuk with 50% excess + 120' shoe. Logging Pro~lram: I Open Hole Logs: I Cased Hole Logs: 12 1/4" MWD Directional only 8 1/2" MWD/GR/RES to the end of first bit run. LWD DIR/GR/RES/DEN/NEU from end of first run to TD. RFT's may be run. GR/CBT Potentially after the completion of the well. Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: KOP: 700' MD Maximum Hole An~lle: Close Approach Well: 52.00 degrees P2-51 9.27' Allowable Deviation at 500' (SI) P2-53 10.44' Allowable Deviation at 600' P2-54 20.68' Allowable Deviation at 1100' (SI), 22.39' Allowable Deviation at 3119' (SI). Requires plug and SI till 4400'MD. Drilling and Completion Scope 1. Move rig to P2-52. NU riser and flowlines. Diverter waived. 2. Directionally drill 12 1/4" surface hole to -5830' MD. 3. Run and cement 9 5/8" casing. Cement to surface. 4. Drill 8-1/2" production hole with MWD DIR/GR/RES to end of first bit run. 5. P/U LWD DIR/GR/DEN/RES/NEU. RIH, Drill to K-10. 6. Change over mud system to 6% KCL. 7. Drill 8-1/2" production hole with to TD at 12546' MD. 8. Attempt to gather RFT data if requested. 9. Run wiper trip (if RFT data attempted). 10. Run and cement 7" L-80/13CR casing. 11.Run 4-1/2" 13CR production tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 4-1/2"x1" GLMs. 12. Secure well, RDMO. Drilling Hazards/Contingencies · The original reservoir pressure is 4350 psi at 8800' ss. The expected reservoir pressure is 4300 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The 10.5 ppg mud will overbalance the anticipated pressure by 500 psi. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing Gumbo problems. · Coal stringers in the lower Ugnu have caused stuck pipe. This occurred on P2-25. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal RECEIVED Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. ~as~ 0]] & r3as O0ns~ 00mr,qissi0ti Fluid Handling: Haul all drilling and completion fluids and other Class II waste~t~rGE;-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH 10/12/97 1200 I DrillQuesf Proposal Data for P2-52 (S) [Wp4] Vertical Origin: Well Reference Horizontal Orlgln: Well Reference Measurement Units: ft North Reference: True North Dogleg Severity: Degrees per 10Oft Vertical Section Azimuth: g5,348° Measured Incl. Azim. Vertical Northlnga Eastinge Vertical Dogleg Depth Depth Section Rate FOR PERMI'I-rlNG ONLY ,r.~oo.Sootart DIr @ 1.000°/100': 700.00' MD.700.00' TVD ,/,.,Continue Dir @ 1.000°/100.: 1100.00' MD,1099.68' TVD 1200.00 Dir @ 1.000°/100" : 1511.94' MD,1509.29'TVD 0.00 0.000 1.392 0.00 0.00 N 0.00 E 0.t30 700.00 0.000 1.392 700.00 0.00 N 0.00 E 0.00 0,000 1100.00 4,000 160.000 1099.68 13,12 S 4.77 E 5,97 1.000 1511.94 8.000 150.000 1509.28 51.46 S 24.03 E 28.72 1.000 1946,55 12.000 140.000 1937.24 112.29 S 68.21 E 78.38 1.000 2697.41 20.0~ 110.000 2659.58 216.34 $ 239.60 E 258.71 1.500 3542.61 36.904 110.000 3400.00 353.56 $ 616.61 E 646.87 2.00(} 3666.67 35.663 110.000 3500.00 378.67 $ 685.60 £ 717.90 I.(l~X) 4299.89 50.000 100.000 3963.70 484.59 S 1100.56 E 1140.92 2,5(X) 5912.08 50.000 100.000 5000.00 699.05 S 2316.81 E 2371.86 {LO(X} 7746.68 52.09/I 88.508 6155.61 802.44 S 3735.42 E 3793.93 0.500 12132.72 52.098 88.508 8850.00 712.32S 7195.10 E 7230.17 12406.19 52.098 88.508 9018.00 706.70 S 7410.82 E 7444.43 0.000 12546.20 52.098 88.508 9104.01 703.83 S 7521.25 E 7554.11 ~D~r I~t~ tncrease'O 'i:5~YY100~ ': 194-6.5'9' WlO,'f937.-24~TVO ......................................................................................................... 9a~e Pe~na/to.~ 2200.~0 2400 Rate Increase @ 2.000°/100' : 2697.41' MD,2659.58' TVD 3600 Rate Decrease @ 1.000°/100': 3542.61' MD.3400.00' TVD Rate Increase @ 2.500°/100': 3666.67' MD,3500.O0' TVD Olr, Start Sail @ 50.000°: 4299.89' MD,3963.70' TVD ~ 4800 >. 5000.00 9 ,~" Cas,~. M~.~3 MDj 4~47.00 TVD DIr @ 0,500"/100' : 5912.08' MD,5000.00'TVD T-3 076 / SVl) 6000 Dir, Start Sail @ 52.098°: 7746.68' MD,6155.61' TVD 8000.00 8500.00 · 7200 West Sa): · 95~co ................................................... r~ C.~lel~s~?nateI 10500.00 11000.00 Target (132-8): 12132,72' MD,8850,00' TVD c~ Kupan~ each Total Depth: 12546.20' MD,9104.01' TVD 7"Liner. 12546.20MD, 9104.01 TVD I I IIII11 II I I111 II II I I I il IIIII I [ I I i II I I I I I I I I I I I I I II I III I I I II I III I I I 0 1200 2400 3600 4800 6000 7200 Scale: I inch = 120Oft Vertical Section Section Azimuth: 95.346 (True North) J Proposal Target Summary Ta~gc( NaJn¢:TVD~s: TVDrkh: Wcll~ad Off, els: Gh)hal C(~mlinate~: J Poh~t Mclntyrc P2-S 8803.(X) 8850.00 712.32 S, 7195.10 E 5997522.(X1N. 688704.00 E SURFACE LOCATION REFERENCE PLOT DATE: 06 · October - 1997 Hotlzonlal C~Mdlnat.s: 5~O69.37 N. 881493.72 E Created By: RKI~ Elevation: 35.30 fl I:~ (EST[ I 1.70 Il We~ (C~ 47.00 I~ I:~B. AMS~L Checked By: Caozd~nale Syltem: ~7 ~ S~ ~, sper, r, - um Well: P2-'32 I DrillQues( FOR PERMITTING ONLY Eastings Scale: I inch = 900ft 0 900 1800 2700 3600 4500 '5400 6300 7200 ~ ~ I ~ ~ I ~ ~ I I I I I I I I I I ~ I I I I ~ ~ ~ I I I I I I [ I I I I I I I I I I I I,I I I I I ~ ~ I ~ I ~ ~ I l ~ ~ I I I ~ ~ ~ ~ ~ ~ ~ I I I I I I I I I I I I I I I I I I I -- -- _ "~-..~ ,.fg; PtMclntyre (P2-S I _~ ~,~ 8850.00 _ ~ -.9' ,,~.~q, 712.32 S, 7195.10 E -- -- 7" Liner - 12546.20 MD, 9104.01 TVD - -- -- -- Ill I'~{~l{ Ill {~ I ~ ~ { ~ ~ ~ ~[~ Illll{ I I { ~ ~ ~ I~ / It ~ {I {I ~ ~ I I { {ll{'-'{I ~ { I {{ {Il ~ ~ ~ll~l II{I I { { 1{ [ I ~ ~ I { I ~ 0 Scale: linch = 900ft Reference is True North 900 1800 2700 3600 4500 5400 6300 7200 Eastings ITargct Name: Point McLnty~ P2-S Proposal Target Summary TV[~s: TVD,'kb:Wellhead Offaets: Global Coonlinates: 8803.00 8850.00712.32 $. 7195.10 E 5997522.00 N. 688704.00 E , SURFACE LOCA'RON REFEREK~CE PLOT DATE: 06 -.~-"to~, - 1997 47,~ R C~ Shared Services Drilling North Slope Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 0.00 0.000 0.000 -47.00 0.00 500.00 0.000 0.000 453.00 500.00 700.00 0.000 0.000 653.00 700.00 800.00 1.000 160.000 752.99 .799.99 900.00 2.000 160.000 852.96 899.96 1000.00 3.000 160.000 952.86 999.86 1100.00 4.000 160.000 1052.68 1099.68 1200.00 4.953 156.101 1152.37 1199.37 1300.00 5.922 153.465 1251.92 1298.92 1400.00 6.899 151.571 1351.29 1398.29 1500.00 7.882 150.147 1450.46 1497.46 1511.94 8.000 150.000 1462.28 1509.28 1600.00 8.784 147.252 1549.40 1596.40 1700.00 9.695 144.673 1648.10 1695.10 1788.27 10.512 142.767 1735.00 1782.00 1800.00 10.621 142.536 1746.54 1793.54 1900.00 11.560 140.741 1844.67 1891.67 1946.55 12.000 140.000 1890.24 1937.24 2000.00 12.407 136.731 1942.48 1989.48 2100.00 13.264 131.183 2039.98 2086.98 2200.00 14.226 126.335 2137.12 2184.12 2300.00 15.273 122.113 2233.83 2280.83 2400.00 16.389 118.437 2330.04 2377.04 2500.00 17.561 115.229 2425.68 2472.68 2600.00 18.778 112.416 2520.69 2567.69 2697.41 20.000 110.000 2612.58 2659.58 2700.00 20.052 110.000 2615.01 2662.01 2800.00 22.052 110.000 2708.33 2755.33 2900.00 24.052 110.000 2800.34 2847.34 3000.00 26.052 110.000 2890.93 2937.93 Sperry-Sun Drilling Services Proposal RePort for P2-52 - P2-52 (S) [Wp4] AK State Plane Zone4 Pt Mac 2 Local Coordinates Northings Eastings (ft) (ft) Folder Reference Dogleg Northings Eastings Rate (fi) (fi) (°/100fi) Vertical Section (ft) Comment o.o0 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.82 S 0.30 E 3.28 S 1.19 E 7.38 S 2.69 E 13.12 S 4.77 E 20.34 S 7.72 E 28.90 S 11.77E 38.80 S 16.93 E 50.03 S 23.21E 51.46 S 24.03 E 62.42 S 30.73 E 75.71S 39.73 E 88.19 S 48.90 E 89.90 S 50.20 E 104.97 S 62.15 E 112.29 $ ' 68.21 E 120.73 S 75.72 E 136.10 S 91.72 E 150.94 S 110.25 E 165.22 S 131.31E 178.94 S 154.87 E 192.09 S 180.92 E 204.66 S 209.45 E 216.34 S 239.60 E 216.64 S 240.43 E 228.92 S 274.19 E 242.32 S 310.98 E 256.80 S 350.77E 5998059.37 N 681493.72 E 5998059.37 N 681493.72 E 0.000 5998059.37 N 681493.72 E 0.000 5998058.56 N 681494.04 E 1.000 5998056.12 N 681494.99 E 1.000 5998052.06 N 681496.58 E 1.000 5998046.37 N 681498.81 E 1.000 5998039.22 N 681501.93 E 1.000 5998030.76 N 681506.19 E 1.000 5998020.99 N 681511.59 E 1.000 5998009.92 N 681518.13 E 1.000 5998008.51N 681518.99 E 1.000 5997997.71N 681525.96 E 1.000 5997984.64 N 681535.28 E 1.000 5997972.40 N 681544.75 E 1.000 5997970.72 N 681546.09 E 1.000 5997955.94 N 681558.40 E 1.000 5997948.77 N 681564.64 E 1.000 5997940.52 N 681572.35 E 1.500 5997925.53 N 681588.72 E 1.500 5997911.15 N 681607.60 E 1.500 5997897.39 N 681629.00 E 1.500 5997884.24 N 681652.89 E 1.500 5997871.73 N 681679.25 E 1.500 5997859.86 N 681708.08 E 1.500 5997848.92 N 681738.50 E 1.500 5997848.63 N 681739.34 E 2.000 5997837.17 N 681773.38 E 2.000 5997824.68 N 681810.49 E 2.000 5997811.17 N 681850.62 E 2.000 0.00 0.00 0.00 0.37 1.49 3.36 5.97 9.58 14.41 20.47 27.77 28.72 36.41 46.61 56.90 58.36 71.66 78.38 86.64 104.00 123.83 146.13 170.87 198.03 227.61 258.71 259.57 294.32 332.20 373.17 Start Dir @ 1.000°/100': 700.00' MD,700.O0' TVD Continue Dir @ 1.000~100' :1100.00' MD,1099.68'TVD Base Permafrost Dir Rate Increase @ 1.500°/100, : 1946.55' MD,1937.24' TVD Dir Rate Increase @ 2.000°/100' : 2697.41' MD,2659.58' TVD Continued... 6 October, 1997- 10:49 - I- DrillQuest Shared Services Drilling North Slope Measured Depth (ft) Incl. Azim. Sperry-Sun Drilling Services Proposal Report for P2-52- P2-52 (S) [Wp4] ; Sub-Sea Vertical Local Coordinates Folder Reference Dogleg Depth Depth Northings Eastings Northings Eastings Rate (fi) (ft) (ft) (fi) (ft) (ft) (°ll00ft) 3100.00 28.052 110.000 2979.99 3026.99 3200.00 30.052 110.000 3067.40 3114.40 3300.00 32.052 110.000 3153.07 3200.07 3400.00 34.052 110.000 3236.88 3283.88 3500.00 36.052 110.000 3318.74 3365.74 3542.61 36.904 110.000 3353.00 3400.00 3600.00 36.330 110.000 3399.06 3446.06 3666.67 35.663 110.000 3453.00 3500.00 3700.00 36.393 109.315 3479.96 3526.96 3800.00 38.603 107.395 3559.29 3606.29 3900.00 40.842 105.654 3636.21 3683.21 3945.02 41.858 104.921 3670.00 3717.00 4000.00 43.105 104.064 3710.55 3757.55 4100.00 45.388 102.603 3782.18 3829.i8 4200.00 47.688 101.253 3850.97 3897.97 4299.89 50.000 100.000 3916.70 3963.70 4500.00 50.000 100.000 4045.33 4092.33 5000.00 50.000 100.000 4366.72 4413.72 5479.59 50.000 100.000 4675.00 4722.00 5500.00 50.000 100.000 4688.12 4735.12 5829.63 50.000 100.000 4900.00 4947.00 5912.08 50.000 100.000 4953.00 5000.00 6000.00 50.074 99.435 5009.47 5056.47 6100.00 50.162 98.793 5073.59 5120.59 6156.87 50.214 98.429 5110.00 5157.00 6200.00 50.253 98.153 5137.59 5184.59 6300.00 50.348 97.515 5201.47 5248.47 6400.00 50.447 96.879 5265.21 5312.21 6500.00 50.548 96.245 5328.82 5375.82 6600.00 50.654 95.612 5392.30 5439.30 AK State Plane Zone4 Pt Mac 2 Vertical Section (ft) Comment 272.35 S 393.50 E 288.96 S 439.13 E 306.60 S 487.60 E 325.25 S 538.85 E 344.89 S 592.81 E 353.56 S 616.61 E 365.27 S 648.78 E 378.67 S 685.60 E 385.26 S 704.07 E 404.40 S 761.84 E 422.56 S 823.11 E 430.40 S 851.79 E 439.68 S 887.74 E 455.76 S 955.63 E 470.74 S 1026.64 E 484.59 S 1100.56 E 511.21 S 1251.52 E 577.72 S ' 1628.73 E 641.52 S 1990.53 E 644.23 S 2005.93 E 688.08 S 2254.60 E 699.05 S 2316.81 E 710.42 S 2383.22 E 722.58 S 2458.99 E 729.12 S 2502.18 E 733.90 S 2534.99 E 744.39 S 2611.21 E 754.04 S 2687.65 E 762.86 S 2764.31 E 770.84 S 2841.17 E 5997796.66 N 681893.72 E 2.000 5997781.16 N 681939.74 E 2.000 5997764.70 N 681988.62 E 2.000 5997747.30 N 682040.31 E 2.000 5997728.97 N 682094.73 E 2.000 5997720.89 N 682118.74 E 2.000 5997709.97 N 682151.18 E 1.000 5997697.47 N 682188.32 E 1.000 5997691.32 N 682206.93 E 2.500 5997673.59 N 682265.16 E 2.500 5997656.93 N 682326.84 E 2.500 5997649.79 N 682355.71E 2.500 5997641.38 N 682391.88 E 2.500 5997626.96 N 682460.14 E 2.500 5997613.70 N 682531.49 E 2.500 5997601.65 N 682605.72 E 2.500 5997578.70 N 682757.29 E 0.000 5997521.37 N 683136.00 E 0.000 5997466.38 N 683499.25 E 0.000 5997464.04 N 683514.70 E 0.000 5997426.25 N 683764.37 E 0.000 5997416.79 N 683826.82 E 0.000 5997407.04 N 683893.50 E 0.500 5997396.73 N 683969.54E 0.500 5997391.24 N 684012.87 E 0.500 5997387.25 N 684045.79 E 0.500 5997378.62 N 684122.24 E 0.500 5997370.83 N 684198.89 E 0.500 5997363.87 N 684275.74 E 0.500 5997357.76 N 684352.77 E 0.500 417.17 464.14 514.04 566.81 622.37 646.87 679.99 717.90 736.90 796.20 858.89 888.19 924.85 993.94 1066.04 1140.92 1293.71 1675.47 2041.65 2057.23 2308.91 2371.86 2439.05 2515.62 2559.23 2592.34 2669.21 2746.22 2823.36 2900.63 Dir Rate Decrease @ 1.000°/100' · 3542.61' MD,3400.00' TVD Dir Rate Increase @ 2.500°/100' ' 3666.67' MD,3500.00' TVD SV4 [Estimate] End Dir, Start Sail @ 50.000°. 4299.89' MD,3963.70' TVD T-3 (TT6 / SV1) 9 5/8' Casing Start Dir @ 0.500°/100' : 5912.08' MD,5000.00' TVD UG4A (K-15) Continued... 6 October, 1997- 10:49 - 2 - DrillQuest Shared Services Drilling North Slope Measured Depth (ft) Incl. Azim. Sperry-Sun Drilling Services Proposal Report for P2-52- P2-52 (S) [Wp4] ' Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 6700.00 50.762 94.982 5455.62 5502.62 6800.00 50.874 94.353 5518.80 5565.80 6900.00 50.990 93.726 5581.83 5628.83 7000.00 51.108 93.102 564~t.69 5691.69 7100.00 51.231 92.479 5707.39 5754.39 7200.00 51.356 91.859 5769.93 5816.93 7300.00 51.484 91.241 5832.29 5879.29 7400.00 51.616 90.625 5894.47 5941.47 7500.00 51.751 90.012 5956.47 6003.47 7600.00 51.890 89.400 6018.29 6065.29 7700.00 52.031 88.791 6079.91 6126.91 7746.68 52.098 88.508 6108.61 6155.61 8000.00 52.098 88.508 6264.22 6311.22 8500.00 52.098 88.508 6571.38 6618.38 9000.00 52.098 88.508 6878.53 6925.53 9067.50 52.098 88.508 6920.00 6967.00 9441.90 52.098 88.508 7150.00 7197.00 9500.00 52.098 88.508 7185.69 7232.69 10000.00 52.098 88.508 7492.85 7539.85 10500.00 52.098 88.508 7800.00 7847.00 11000.00 52.098 88.508 8107.16 8154.16 11500.00 52.098 88.508 8414.31 8461.31 11561.35 52.098 88.508 8452.00 8499.00 11956.91 52.098 88.508 8695.00 8742.00 12000.00 52~098 88~508 8721.47 8768.47 12095.28 52.098 88.508 8780.00 8827.00 12132.72 52.098 88.508 8803.00 8850.00 1.2406.19 52.098 88.508 8971.00 9018.00 12464.80 52.098 88.508 9007.00 9054.00 12500.00 52.098 88.508 9028.63 9075.63 777.98 S 2918.23 E 784.29 S 2995.49 E 789.76 S 3072.93 E 794.39 S 3150.56 E 798.18 S 3228.37 E 801.13 S 3306.35 E 803.25 S 3384.49 E ' 804.52 $ 3462.80 E 804.96 S 3541.26 E 804.56 S 3619.86 E 803.31 S 3698.61 E 802.44 S 3735.42 E 797.24 S 3935.23 E 786.97 S 4329.63 E 776.69 S 4724.03 E 775.31 S 4777.27 E 767.61 S 5072.60 E 766.42 $ ' 5118.43 E 756.15 S 5512.82 E 745.87 S 5907.22 E 735.60 S 6301.62 E 725.32 S 6696.02 E 724.06 S 6744.41 E 715.94 S 7056.43 E 715.05 S 7090.42 E 713.09 S 7165.57 E 712.32 S 7195.10 E 706.70 S 7410.82 E 705.50 S 7457.04 E 704.78 S 7484.81 E Folder Reference Dogleg Vertical Northings Eastings Rate Section (fi) (fi) (°/100ft) (ft) 5997352.49 N 684429.98 E 0.500 2978.02 5997348.06 N 684507.37 E 0.500 3055.53 5997344.48 N 684584.93 E 0.500 3133.15 5997341.73 N 684662.65 E 0.500 3210.87 5997339.83 N 684740.52 E 0.500 3288.69 5997338.77 N 684818.55 E 0.500 3366.61 5997338.56 N 684896.72 E 0.500 3444.61 5997339.18 N 684975.03 E 0.500 3522.69 5997340.65 N 685053.48 E 0.500 3600.85 5997342.97 N 685132.05 E 0.500 3679.08 5997346.12 N 685210.75 E 0.500 3757.37 5997347.88 N 685247.52 E 0.500 3793.93 5997357.94 N 685447.15 E 0.000 3992.40 5997377.79 N 685841.19 E 0.000 4384.12 5997397.64 N 686235.22 E 0.000 4775.85 5997400.32 N 686288.41 E 0.000 4828.73 5997415.18 N 686583.47 E 0.000 5122.05 5997417.49 N 686629.25 E 0.000 5167.57 5997437.34 N 687023.28 E 0.000 5559.30 5997457.18 N 687417.31 E 0.000 5951.02 5997477.03 N 687811.35 E 0.000 6342.75 5997496.88 N 688205.38 E 0.000 6734.47 5997499.32 N 688253.72 E 0.000 6782.53 5997515.02 N 688565.45 E 0.000 7092.44 5997516.73 N 688599.41 E 0.000 7126.20 5997520.51N 688674.49 E 0.000 7200.84 5997522.00 N 688704.00 E 0.000 7230.17 5997532.86 N 688919.52 E 0.000 7444.43 5997535.18 N 688965.70 E 0.000 7490.34 5997536.58 N 688993.44 E 0.000 7517.92 AK State Plane Zone4 Pt Mac 2 Comment End Dir, Start Sail @ 52.098° · 7746.68' MD,6155.61' TVD West Sak Top Colville [Estimate] CM3 (K-10) HRZ Kalubik TKarget {P2-S) - 12132.72' M D, 8850.00' TVD uparuK Kuparuk Zone LA Miluveach 6 October, 1997- 10:49 Continued... -3- DriliQuest Sperry-Sun Drilling Services Proposal Report for P2-52- P2-52 (S) [Wp4] Shared Services Drilling North Slope Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Folder Reference Dogleg Northings Eastings Rate (ft) (ft) (°/100fi) Vertical Section (ft) Comment ,~ 12546.'20 52.098 88.508 9057.01 9104.01 703.83 S 7521.25 E 5997538.41 N All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Based upon Minimum Curvature type calculations, at a Measured Depth of 12546.20ft., The Bottom Hole Displacement is 7554.11ft., in the Direction of 95.346° (True). 689029.85 E 0.000 7554.11 Total Depth - 12546.20' MD,9104.01' TVD 7' Liner Targets associated with this wellpath Target Entry Coordinates Target TVD Northings Eastings Name (ft) (ft) (ft) PtMclntyre {P2~S} 8850.00 712.32 S 7195.10 E Target Target Shape Type Circle Geological AK State Plane Zone4 Pt Mac 2 6 October, 1997 - 10:49 - 4 - DrillQuest TREE: 4-1/16"-5M chrome P2 52 RT-GL=3~, WELLHEAD: 11 X 11" - 5M FMC ..~ m GL-SL = 12.8' Gan 5 Type ' ~ ;:.:'i?!i;}:::~::i:i::i.!iii~ I 2000 i m 4-1/2" BAL'O .... ............... 9-5/8", 40#/fi, L-80 5830' ~ J ~:rr~',ii;~i~,i:~i~.;;~ k BTC i!ii':~i~, i (3A8 LII- I MANDHEL~ KO P: 700' ~ ~iW ;~i'i , ~ ]-'ii~Wi~;:~:.: :.:~i~;~i~i (Camco 4-1/2xl"KGB-2-LS") MAX ANGLE: 52° @ 7747' MD g N° 4-1/2" 12.t3# 1:3 Cr NSCI TUBING 4 TUBING I D: 3.958" i~!!:~! 5 ' ~ ................ i i!~!~i~i!i~: ,, i 40' MD above ~ ~ packer PERFORAIION SHMMAR¥: ~ Ref Log: ~ i~ Size i Interval SPF Open/Sqzd ! --TOP OF CHROME 7" = 11833' 7 , 213 & 2g #/tt, ~. L-80 Mod BTC / 13CR NSCT ~ ~ .~, ,.~ '~ ~~~:~.~:~¢;~ _ 7" Packer,OCr 12203' 4-1/2" 'X' Nipple m.~ m ~ ~ 4-1/2" 'XN' Nipple I ~ , ~- 4-1/2" WLEG 12233' 'L ~o 7" CHROME ' MARKER JOINT (20') ABOVE KUPARUK BUT BELOW TT. 7" shoe at I 12546' I & DATE REV. BY COMMENTS Point Mclntyre WELL: P2-52 10/12/97 GH PLANNED COMPLETION APl NO: 50-029- Shared Services Drilling H 12 8 3 5 8 l o,,o~/,~ oo~~8 VENDOR ALASKAST 14 O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 1001~7 CKIO01~7C 100. O0 100. O0 PYMT .'OMMENTS: pe~it to d~ill ~ppliCation HANDL[N~ INST: s/h Kathy Campoanoe, x5122 I ........... .~:p.~ I. lid P~.YMENT FOR ITEM~ DE~,CRIBED ABOVE, ~ ~ 1 ~-}O_ ~)~) I O0 ~'~0 · WELL PERMIT CHECKLIST COMPANY ..~. £...,~,..-> WELL NAME ,~- FIELD & POOL ,i~_~ .~"'/o 43 INIT CLASS /~.-¢-." ,/"'<::~,7 GEOL AREA PROGRAM: exp [] de,,~redrll [] serv [] wellbore seg E: ann. disposal para req [] ~::~'::,:~ 4:3 UNIT# ,///~"' ,.5'<::::> ON/OFF SHORE ~ (~) ADMINISTRATION . 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 13. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... ~ 15. Surface casing protects all known USDWs ........... ~(~'(~N 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CBT will cover all known productive horizons .......... (.~,~N 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... N 22. Adequate wellbore separation proposed ............. N 23. If diverter required, does it meet regulations .......... N 24. Drilling fluid program schematic & equip list adequate ..... N 25. BOPEs, do they meet regulation ...... ~,~ ..... N 26. BOPE press rating appropriate; test to ~ psig. N 27. Choke manifold complies w/APl RP-53 (May 84) ........ N 28. Work will occur without operation shutdown ........... N 29. Is presence of H2S gas probable ................. N GEOLOGY APPR DANTE ,/ / 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N~/~ . 31. Data presented on potential overpressure zones ....... Y./,N' 32. Seismic analysis of shallow gas zones ............. /,Y N 33. Seabed condition survey (if off-shore) ............ // Y N 34. Contact name/phone for we_eklyprogress reports .... ./K.. Y N [exploratory only] REMARKS GEOLOGY: ENGINEERING: COMMISSION: BE~~. 'O/'Z~ DWJ JDH ~ RNC~ CO Commentsllnstructions: HOW/Ijt - A:\FORMS\cheklist rev 09/97 Well History File APPENDIX Information of. detailed nature that is not particularly germane to the Well Permitting Process but is part of the history_ file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Mon Dec 15 11:09:08 1997 Reel Header Service name ............. LISTPE Date ..................... 97/12/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Tape Header Service name ............. LISTPE Date ..................... 97/12/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Numbe~ ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Comment Record TAPE HEADER POINT McINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 2 AK-MM-80023 R. KRELL KIRK WHITE M C- OF LMEg P2-52 500292282600 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 15-DEC-97 MWD RUN 3 AK-MM- 80023 RANDY KRELL CARLA LENZ 14 12N 14E 523 1245 47.20 45.70 11.70 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 5836.0 8.500 12520.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4). 4. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR), ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4), COMPENSATED NEUTRON POROSITY (CNP) AND STABILIZED LITHO DENSITY (SLD). 5. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN M. MI/NYAK OF SPERRY-SUN DRILLING SERVICES AND TOM WALKER OF ARCO ALASKA, INC. ON 11 DECEMBER, 1997. 6. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12520'MD, 9137'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE MATRIX-FIXED HOLE SIZE). SNNA = SMOOTHED AVERAGE OF NEAR DETECTORS' COUNT RATES. SNFA = SMOOTHED AVERAGE OF FAR DETECTORS' COUNT RATES. SBD2 = RAPID SAMPLE SMOOTHED BULK DENSITY - COMPENSATED. SC02 = RAPID SAMPLE SMOOTHED STANDOFF CORRECTION. SNP2 = RAPID SAMPLE SMOOTHED NEAR DETECTOR PHOTOELECTRIC ABSORPTION FACTOR. ENVIRONMENTAL PARAMETERS USED FOR NUCLEAR/NEUTRON LOG PROCESSING: HOLE SIZE = MUD FILTRATE SALINITY = MUD WEIGHT = FORMATION WATER SALINITY = LITHOLOGY = $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/12/15 Maximum Physical Record..65535 File Type ................ LO 17000 PPM CL- 10.65 PPG 14545 PPM CL- SANDSTONE Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE START DEPTH GR 5800.0 ROP 5820.0 FET 5830.5 RPD 5830.5 RPM 5830.5 RPS 5830.5 RPX 5830.5 FCNT 11200.0 NCNT 11200.0 NPHI 11200.0 PEF I1213.5 DRHO 11213.5 RHOB 11213.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: STOP DEPTH 12477.0 12521.0 12457 5 12457 5 12457 5 12457 5 12457 5 12431 4 12431 5 12431 5 12466 5 12466 5 12466 5 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 5820.0 9465.0 3 9465.0 12520.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD AAPI 4 1 68 4 2 RPX MWD OHMM 4 1 68 8 3 RPS MWD OH/4~ 4 1 68 12 4 RPM MWD OHMM 4 1 68 16 5 RPD MWD OHM~ 4 1 68 20 6 ROP MWD FT/H 4 1 68 24 7 FET MWD HRS 4 1 68 NPHI MWD P.U. 4 1 68 FCNT MWD CNTS 4 1 68 NCNT MWD CNTS 4 1 68 SBD2 MWD G/CC 4 1 68 SC02 MWD G/CC 4 1 68 SNP2 MWD BARN 4 1 68 28 32 36 4O 44 48 52 8 9 10 11 12 13 14 Name Min Max Mean Nsam DEPT 5800 12521 9160.5 13443 GR 17.8388 405.842 82.435 13355 RPX 0.3531 2000 4.36803 13255 RPS 0.5618 2000 4.73163 13255 RPM 0.4794 2000 5.57995 13255 RPD 0.4627 2000 5.71138 13255 ROP 12.4838 2381.84 208.546 13403 FET 0.155 51.0461 0.982197 13255 NPHI 18.9712 81.7622 36.9939 2464 FCNT 537.663 I283.13 781.51 2464 NCNT 2174.95 3656 2895.79 2464 SBD2 2.0061 3.0255 2.46487 2507 SC02 -0.063 0.4048 0.0409686 2507 SNP2 1.8523 8.6614 3.64278 2507 First Reading 5800 5800 5830.5 5830.5 5830.5 5830.5 5820 5830.5 11200 11200 11200 11213.5 11213.5 11213.5 Last Reading 12521 12477 12457.5 12457.5 12457.5 12457.5 12521 12457.5 12431.5 12431.5 12431.5 12466.5 12466.5 12466.5 First Reading For Entire File .......... 5800 Last Reading For Entire File ........... 12521 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/12/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/12/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 5800.0 ROP 5820.0 FET 5830.5 RPD 5830.5 RPM 5830.5 RPS 5830.5 RPX 5830.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED'(RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHI~M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record STOP DEPTH 9434 0 9465 0 9426 5 9426 5 9426 5 9426 5 9426 5 29-NOV-97 ISC 5.06 5.46 MEMORY 9465.0 5820.0 9465.0 49.2 52.6 TOOL NUMBER P0896CRG6 P0896CRG6 8.500 8.5 KCL / POLYMER/GEL 9.40 42.0 10.5 10000 7.6 .340 .220 .250 .550 47.8 Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units DEPT FT 4 1 68 GR MWD 2 AAPI 4 1 68 RPX MWD 2 OHMM 4 1 68 RPS MWD 2 OHMM 4 1 68 RPM MWD 2 OHMM 4 1 68 RPD MWD 2 OHMM 4 1 68 ROP MWD 2 FT/H 4 1 68 FET MWD 2 HOUR 4 1 68 Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 5800 9465 7632.5 GR 17.8388 137.7'83 64.6604 RPX 0.3531 2000 3.44268 RPS 0.5618 2000 3.29037 RPM 0.4794 2000 4.29948 RPD 0.4627 2000 4.79279 ROP 12.4838 2381.84 246.025 FET 0.155 51.0461 0.739807 Nsam 7331 7269 7193 7193 7193 7193 7291 7193 First Reading 5800 5800 5830.5 583O.5 5830.5 583O.5 5820 5830.5 Last Reading 9465 9434 9426.5 9426.5 9426.5 9426.5 9465 9426.5 First Reading For Entire File .......... 5800 Last Reading For Entire File ........... 9465 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/12/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/12/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 BIT RUN NI/MBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR ROP FCNT NCNT NPHI PEF DRHO RHOB $ LOG HEADER DATA DATE LOGGED: SOFTWARE Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. 3 .5000 START DEPTH STOP DEPTH 9402.0 12457.5 9402.0 12457.5 9402.0 12457.5 9402.0 12457.5 9402.0 12457.5 9422.0 12477.0 9466.5 12521.0 11200.0 12431.5 11200.0 12431.5 11200.0 12431.5 11213.5 12466.5 ~1213.5 12466.5 11213.5 12466.5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMI3HANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE-AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: 02-DEC-97 ISC 5.06 5.46 MEMORY 12520.0 9465.0 12520.0 41.4 52.9 TOOL NUMBER P0889CRLGM6 P0889CRLGM6 P0889CRLGM6 P0889CRLGM6 8.500 8.5 LCL/POLYMER/GEL 10.60 46.0 8.5 17000 4.4 .360 .165 68.9 MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per rec6rd ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .240 .460 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 3 AAPI 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 NPHI MWD 3 P.U. 4 1 68 ROP MWD 3 FT/H 4 1 68 FET MWD 3 HOUR 4 1 68 FCNT MWD 3 CNTS 4 1 68 NCNT MWD 3 CNTS 4 1 68 SBD2 MWD 3 G/CC 4 1 68 SCO2 MWD 3 G/CC 4 1 68 SNP2 MBID 3 BARN 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 2O 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Min Max Mean DEPT 9402 12521 10961.5 GR 21:5248 405.842 103.543 RPX 0.7761 110.823 5.44469 RPS 0.8302 167.441 6.41446 RPM 0.873 197.174 7.0671 RPD 0.8317 152.532 6.77115 NPHI 18.9712 81.7622 36.9939 ROP 16.7088 424.933 163.839 FET 0.4135 13.4308 1.36866 FCNT 537.663 1283.13 781.51 NCNT 2174.95 3656 2895.79 SBD2 2.0061 3.0255 2.46487 SCO2 -0.063 0.4048 0.0409686 SNP2 1.8523 8.6614 3.64278 Nsam 6239 6111 6112 6112 6112 6112 2464 6110 6112 2464 2464 2507 2507 2507 First Reading 9402 9422 9402 9402 9402 9402 11200 9466.5 9402 11200 11200 11213.5 11213.5 11213.5 Last Reading 12521 12477 12457.5 12457.5 12457.5 12457.5 12431.5 12521 12457.5 12431.5 12431.5 12466.5 12466.5 12466.5 First Reading For Entire File .......... 9402 Last Reading For Entire File ........... 12521 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/12/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/12/15 Origin ................... STS T~pe Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 97/12/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File