Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
205-098
Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q~j - ~ C~' ~ Well History File Identifier Organizing (done) ^ Two-sided III IIIIIIIIII I II III ^ Rescan Needed III 111111II11 111 111 R CAN Color Items: DIGITAL DATA Diskettes N ~J OVERSIZED (Scannable) M , o. ^ aps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: BY M i D ^ Other:: ~~ : ar a Date: 3 /s/ Project Proofing I II 1 111 1 1111 111 1111 BY: aria Date: ~ /s/ Scanning Preparation _~ x 30 = ~ ~ + o~ =TOTAL PAGES BY: Maria _ Date:_~ a ~ ~ ~ ~ ~' (Count does not include cover sheet) /s/ _ ~, f ~ 1111111111111111111 Production Scanning Stage 1 Page Count from Scanned File: (count does include cover sheet) Page Count Matches Number in Scanning Preparation:. YES NO BY: Maria Date: ~ °Q''~ / (~ ~ !s/ Stage 1 if NO in stage 1, page(s) discrepancies werJJe found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III 11111111111 11111 ReScanned III 11111111111 I I NI BY: Maria Date: Isl Comments about this file: o~a~~.~~~kea iiiimmiiiimu 10/6!2005 Well History File Cover Page.doc BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 Mr. Tom Maunder ~~~G~~ J~J~ 2010 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue n ~~~ Anchorage, Alaska 99501 4t,, Subject: Corrosion Inhibitor Treatments of GPB DS 06 ~ ~J ''` d Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 06 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-06 Date: 12/10/09 c Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al os-o1 1750490 50029201720000 NA Sealed NA 06-02 1770780 50029202820000 NA Sealed NA os-o3A 1951520 50029201860100 NA Sealed NA o6-oaA 2001020 50029201790100 NA Sealed NA 06-05 1780200 50o2s2o298000o NA Sealed NA os-osB 2050980... 50029202010200 NA Sealed NA os-o7 1780210 50029202990000 NA Sealed NA o6-O8A 1951950 5o02s2o3oo010o NA Sealed NA o6-os 1790730 50o292oa0o0ooo NA Sealed NA o6-1oA 1981960 50029204020100 NA Sealed NA os-11 1791100 50o292oa28oooo NA Sealed NA 06-12A 1920640 50029204560100 NA 0.5 NA 3.40 10/6/2009 06-13A 2061020 50029204570100 NA Sealed NA o6-14B 2090120 50029204580200 NA Sealed NA os-15 1800320 50o292oa5soooo NA Sealed NA 06-16 1800330 50o2s204sooooo NA Sealed NA os-18A 2090630 50029207670100 NA 0.3 NA 1.70 11/5/2009 06-19A 2081020 50029207910100 NA 1.5 NA 6.80 10/4/2009 06-20A 2050790 50029207990100 NA 1 NA 5.10 10/4/2009 06-218 2080990 50029208020200 NA 6 NA 42.50 12/14/2009 06-22A 1930570 50029208060100 NA 1.5 NA 5.10 10/4/2009 06-23C 2080920 50029208080300 NA 4.6 NA 30.60 10/6/2009 06-24A 2000960 50029208220100 NA Sealed NA gyr data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 4~,;,F~'~t~.~ ~~' ~. c~ dUt7~ July 31, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 • a~~ D~ ~ Re: Drill Site 6, We{I #06-06B Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, /~~`'' Rob Shoup North American Regional Manager RS:tf Serving the Worldwide Energy Industry with Precision Survey Instrumentation gy data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 SURVEY REPORT BP Drill Site 6#06-06B Mast Truck Prudhoe Bay, AK AK0708G_142 26 Ju12008 ~~ • ~~~' Serving the Worldwide Energy Industry with Precision Survey Instrumentation ~~s/ ~~~ A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) Lease: Drill Site 6 Well: 06-06B, 4-1l2" Tubing Location: Mast Truck, Prudhue Bay, Alaska. Job Number: AK0708G 142 Run Date: 26 Ju12008 Surveyor: Scott Smith Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.243045 deg. N Longitude: 148.498227 deg. W Azimuth Correction: Gyro: Beaxings are Relative to True North Vertical Section Calculated`from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2° Tubing `Location: Mast Truck, Prudhue Bay, Alaska lob Number: AK0708G 142 .MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY .DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E F 0 - :11125 T. RATE GYROS COPIC CONTINU OUS M ULTISHO T SURVEY RUN INSIDE 4-1/2" TUBING ON SCHLUMBERGER WIRELIKE ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO NABORS #2 ES R.K.B. OF 65.8 FT. AMSL 100.00 0.41 116.47 S 63 32 E 0.10 100.00 0.4 116.5 0.16 S 0.32 E 200.00.. 0.32 76.28 N 76 17 E 0.07 200.00 1.0 105.5 0.25 S 0.92 E .300.00 0.27. 29.44 N 29 26 E 0.06 300.00 1.3 89.3 0.02 N 1.30. E 400.00 0.27 125.44 S 54 34 E 0.10 400.00 1.6 87.0 0.08 N 1.61 E 500.00. 0.28 23.50 N 23 30 E 0.11 499.99 1.9 84.8 0.17 N 1.$9 E ..600.00 031 81.97 N 81 58 E 0.07 599.99 2.3 79.2 0.43 N 2.25 E 700.00 0.29 110.48 S 69 31 E 0.04 699.99 2.8 $2.2 0.38 N 2.76 E :800.00 0.28 .146.78 S 33 13 E 0.04 799.99 3.1 88.5 0.08 N 3.13 E 900.00 0.28 129.81 S 50 12 E 0.02 899.99 3.5 94.6 0.28 S 3.45 E 1000.00 0.16 37.01 N 37 1 E 0.08 999.99 3.7 95.0 0.33 S 3.72 E 1100.00 0.26 262.91 S 82 55 W 0.10 1099.99 3.6 93.9 0.25 S 3.58E 1200.00 0.25 259.38 S 79 23 W -0.00 1199.99 3.2 95.7 0.31 S 3.14 E 1300.00 0.25 264.35 S 84 21 W 0.01 1299.99 2.7 97.9 0.37 S 2.71 E 1400.00 0.23 268.01 S 88 1 W 0.01 1399.99 2.3 100.0 0.40 S 2.29' E 1500.00 0.21 259.49 S 79 29 W 0.01 1499.99 2.0 103.1- 0.44 S 1:91 E 1600.00. 0.14 310.05 ' N 49 57 W 0.04 1599.99 1.7 103.7 0.40 S 1.63' E 1700.00 0.36 94.70 S 85 18 E 0.12 '1699.98 1.9 100.6 0.35 S 1.85' E 1800.00 0.39 71.14 N 71 8 'E 0.04 1799.98 2.5 96.0 0.26 S 2.49E 1900.00 0.33 55.69 N 55 42 E 0.03 1899.98. 3.1 .89.7 0.01 N 3.06 E 2000.00 0.42 37.11 N 37 6 E 0.04 1999.98 3.5 82.4 0.47 N 3.52 E 2 A Gyrodata Directional Survey BP Exploration (Alaska) .Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing ,Location: Mast Truck, Prudhu e Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINA TES .feet deg. deg. deg. min. deg./ feet feet deg. feet 25 8. 2100.00 0.46 8.86 N 8 52 E 0.05 .2099.98 4.0 -73.0 1.16 N 3.80E • 2200.00 0.48 10.47 N 10 28 E 0.01 2199.97 4.4 .63.5 1.97 N 3:94 E 2300.00 0.31 62.48 N 62 29 E 0.09 2299.97 4.9 59.5 2.51 N 4.26 E 2400.00 0.14 94.90 S 85 6 E 0.05 2399.97 5.3 60.4 2.62 N 4.62 E 2500.00 0.05 112.63 S 67 22 E 0.02 2499.97 5.4 61.5 2.59 N 4.78E 2600.00 0.26 347.24 N 12 46 W 0.07 2599.97 5.5 59.6 2.80 N 4.77 E 2700.00 , 0.09 263.41 S 83 25 W 0.07 2699.97 5.5 57.0 3.02 N 4.64E 2800.00 0.27 .16.90 N 16 54 E 0.08 2799.97. 5.7 55.1. 3.24 N 4.64 E 2900.00 3.16 166.70 S 13 18 E 0.85 2899.92 5.4 81.7 0.78 N 5.34 E 3000.00 7.18 168.72 S 11 17 E 1.01 2999.49 10.8 138.2 8.04 S 7.20 E 3250.00 17.13 177.94 S 2 4 E 1.01 3243.60 61.4 169.1.: 60.30 S 11.59 E 3275.00 17.38 .177.83 S 2 10 E 0.25 3267.47 68.7 170.1 67.71 S 1.1.87 E 3300.00 17.71 177.91 S 2 5 E 0.33 3291.31 76.2 ` 170.8 75.24 S 12.15 E 3325.00 18.01 177.91 S 2 3 E 0.30 3315.11 83.8 171.5 82.90 S 12.43 E 3350.00 18.41 178.48 S 1 31 E 0.44 3338.86 91.6 172.0 90.70 S 12.67 E 3375.00 18.75 178.51 S 1 29 E 0.34 3362.55 99.5 172.6 98.67 S 12.88E . 3400.00 19.14 179.29 S 0 43 E 0.46 3386.20 107.6 173.0 106.78 S 13.04 E 3425.00 19.48 179.43 S 0 34 E 0.34 3409.79 115.8 '173.5 i 15.05 S 13.13 E 3450.00 19.76 179.44 S 0 33 E 0.28 3433.34 124.1 173.9 123.44 S 13:21 E 3475.00 20.20 180.17 S 0 10 W 0.51 3456.84 132.6 174.3 131.98 S 13.24 E 3500.00 20.63 180.73 S 0 44 W 0.47 3480.27 141.3 174.7 140.70 S 13.17 E 3525.00 21.06 181.47 ' S 1 28 W 0.50 3503.63 150.2 175.0 149.60 S 13.00 E .3550:00 21.46 181.80 S 1 48 W -0.42 3526.93 159.2 175.4 158.66 S 12.74 E 3575.00 21.87 182.07: S 2 4 W 0.42 3550.16 1683 175.8.: 167.88 S 12.43 E 3 A Gyrodata Directional Survey BP Exploration (Alaska.) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska lob Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH bIST. AZIMUTH COORDINATES feet deg. deg.. deg. min. deg./ feet feet deg. feet 25 ft. 3600.00 22.29 182.77 S 2 46 W 0.49 3573.33 177.7 176.1 177.27 S 12.03 E 3625 • : .00 22.75 183.09 S 3 5 W 0.48 3596.42 187.2 .176.5 186.83 S 11.54E 3650.00 23.23 183.84 S 3 51 W 0.56 3619.44 196.9 176.8 196.58 S 10.95 E 3675.00 23.71 184.13 S 4 8 W 0.49 3642.37 206.8 177.2 206.51 S 10.26 E 3700.00 24.23 .184.35 S 4 21 W 0.53 3665.21 216.8 177.5 216.64 S 9.51 E 3725A0 24.77 183.25 S 3 15 W 0.71 3687.96 227.2 177.8 226.98 S 8.82 E 3750.00 25.36 181.90 S 1 54 W 0.82 3710.61 237.7 178.0 237.56 S 8.35 E 3775.00 25.99 181.21 S 1 13 W 0.70 3733.14 248.5 178.1. 248.39 S 8.06 E 3800.00 26.61 181.15 S 1 9 W 0.62 3755.55 259.6 178.3 259.46 S 7.83 E 3825.00 27.22 181.28 S 1 17 W 0.61 3777.85 270.9 178.4 270.78 S 7.59 E 3850.00 27.76 181.72 S 1 43 W 0.58 3800.02 282.4 178.5 282.31 S 7.29 E 3875.00 28.30 182.18 S 2 11 W 0.59 3822.09 294.1 178.7 294.05 S 6.89 E 3900.00 28.77 182.85. S 2 51 W 0.56 3844.05 306.0 178.8 305.98 S 636 E 3925.00 29.33 183.07 S 3 4 W 0.57 3865.91 318.2 179.0 318.1 i S 5.73 E 3950.00 29.93 183.17 S 3 10 W 0.60 3887.64 330.5 179.1 330.45 S 5.06 E 3975.00 30.40 183.74 S 3 45 W 0.55 3909.25 343.0 179.3 342.99 S 4.30E 4000.00 31.01 184.21- S 4 13 W 0.66 3930.75 355.7 179.4 355.72 S 3.42 E 4025.00 31.68 184.55 S 4 33 W 0.69 3952.10 368.7 179.6 368.69 S 2.42 E 4050..00 32.41 184.70: S 4 42 W 0.74 3973.29 381.9 179:8 381.91 S 1.35 E 4075.00 33.14. 184.80 S 4 48 W 0.73 3994.31 395.4 180.0 395.40 S 0.23 E 4100.00 33.88 184.89 S 4 54 W 0.73 4015.16 409.1 180.1. 409.15 S 0.93W 4125.00 34.57 .184.93 S 4 56 W ,0.70 4035.83 423.2 180.3 423.16 S 2.13 W 4150.00 35.27 185.10 S 5 6 W 0.71 4056.32 437.4 180.4 437.42 S 3.39W 4175.00 35.84 185.34 S 5 20 W 0.58 4076.66 451.9 180.6 451.89 S 4.71 W 4' A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number. AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 4200.00 36.23 185.81 S 5 49 W 0.48 4096.88 466.6 180.8" - 466.53 S b.14 W 4225.00 36.91 185.92 S 5 55 W 0.69 4116.96 481.4 180.9 481.35 S 7.66 W • 4250.00 37.60 186.09 S 6 5 W 0.70 4136.86 496.5 181.1 496.40 S 9.24 W 4275.00 38.21 186.50 S 6 30 W 0.66 4156.58 511.8 181.2 511.67 S 10.93W 4300.00 38.92 186.82 S 6 50 W 0.74 4176.13. 527.3 181.4 527.15 S '12:74 W 4325.00 39.46 187.24 S 7 14 W 0.60 4195.50 543.0 181.5 542.83 S 14.67 W 4350.00 40.24 187.58 S 7 35 W 0.81 4214.69 559.0 181.7 558.71 S 16.74 W 4375.00 40.88 188.00 S 8 0 W 0.69 4233.69 575.1 181.9 574.82 S 18.94 W 4400.00 41.56 188.34 S 8 21 W 0.72 4252.49 591.5 182.1 591.12 S 21.28 W 4425.00 42.36 188.63 S 8 38 W 0.83 4271.08 608.1 182.2 607.66 S 23.75 W 4450.00. .43.04 189.01 S 9 1 W 0.72 4289.46 625.0 182.4 -b24.41 S 26.35W 4475.00 43.84 189.19 S 9 11 W 0.81 4307.61 642.0 .182.6 64138 S 29:07W 4500:00 44.35 189.55 S 9 33 W 0.57 4325.56 659.3 182:8 658.55 S 31.90 W 4525.00 45.16 189.73 S 9 44 W 0.82 4343.32 676.8 183.0 675.90 S 34.85 W 4550:00 45.83 189.89 S 9 54 W 0.69 4360.84 b94.5 183.1 ` 693:47 S 37:89 W 4575.00 46.23 190.22 S 10 13 W 0.46 4378.20 712.4 183.3 711:18 S 41.03 W 4600.00. 47.10 190.47 S 10 28 W 0.88 4395.35 730.4 183.5 729.07 S 44.29 W 4625:00 47.87 190.72 S 10 43 W 0.80 4412.25 748.7 183.7 747.18 S 47:68 W 4650:00 48.10 191.04 S 11 2 W 0.33 4428.98 767.1 183.8 765.43 - S 51.19 W 4675.00 48.89 191.17 S 11 10 W 0.80 4445.55 785.7 1$4.0 783.80 S 54:79 W "4700.00 49.46 191.43 S 11 26 W 0.60 4461.89 804.5 184.2 802.35 S 5'8.50 W .4725:00 50.38 191.56 S 11 34 W 0.92 4477.99 823.5 184.3 821.09 S 62.31 W 4750.00 51.00 191.80 S 11 48 W 0.65 4493.83 842.6 184.5 ° 840.03 S 66.23 W 4775.00 51.39 191.95 S 11 57 W 0.41 4509.50 862.0 184.7 ' 859:10 S 70.24 W 5 A Gyrodata Directional Survey BP :Exploration (Alaska) Lease: Dri11 Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. 4800.00 52.26 4825.00 52.99 4850.00 53.76 4875:00 53.84 4900.00 55.05 4925.00 55.56 .4950.00 55.11 4975.00 55.24 5000.00 55.43 .5025.00. .55.64 5050.00 .56.03 :.5075.00 56.11 5100.00 56.49 5125.00 56.67 5150:00 56.85 5175.00 56.75 5200.00 56.71 5225.00 57.59 5250.00 57.39 5275.00 57.44 5300:00 57.59 5325:00 57.41 5350.00 57.48 192.14 S 12 8 W 192.31 S 12 19 W 192.40 S 12 24 W 192.47 S 12 28 W 192.59 S 12 36 W 192.55 S 12 33 W 192.76 S 12 46 W 192.85 S 12 51 W 192.89 S 12 53 W 192.88 S 12 53 W 192.98 S 12 59 W 192.93 S 12 56 W 193.16 S 13 9 W 193.16 S 13 10 W 193.21 S 13 13 W 193.36 S 13 21 W .193.50 S 13 30 W 193.37 S 13 23 W .193.44 S 13 27 W .193.62 S 13 37 W 193.81 S 13 49 W 193.89 S 13 53 W 193.81 S 13 49 W 5375:00 58.01 193.85 S 13 51 W DOGLEG VERTICAL SEVERITY DEPTH deg./ feet 25 ft. 0.88 0.75 0.77 0.10 1.22 ..0.51 0.49 0.15 0.19 0.22 0.40 0.09 0.43 0.18 0.19 0.16 0.13 0.89 0.21 0.16 0.23 0.19 0.10 0.53 .:CLOSURE HORIZONTAL DIST. AZIMUTH COORDINATES feet deg. feet .4524.95 881.5 184.8 878.32 S 7434'W 4540.12 901.2 185.0. 897.73 S 78.55 W 4555.04 921.1 185.2 917.33 S 82.84 W 4569.80 941.1 185.3 937.03 S 87. T8 W 4584.34 961.3 185.5 956.89 S 91.60 W 4598.57 981.7 185.6 976.95 S 96.07 W 4612.79 1002.1. 185.8 997.01 S 100.57 W 4627.06 1022.4 185.9 1017.03 S 105.12 W 4641.28 1042.9 186.0 1037.07 S 109:70 W 4655.43 1063.3 186.2 1057.16 S 114.30 W 4669.47 1083.9: 1863 1077.33 S 118.93W 4683.42 1104.5 186.4 1097.54 S 123.58 W 4697.29 1125.1 186.5 1117.80 S 128.27 W 4711.06 1145.9. .186.7 1138.12 S - 133.02 W ..4724.77 1166.6. 186.8 1158.48 S 137.80 W .4738.45 1187.4 186.9 1178.84 S 142.60W .4752.17 1208.2 187.0. 1199.17 S 147.46W 4765.73 1229.1 187.1 1219.60 S 152.33 W 4779.17 250.0 187.2 `1240.11 S 157.22 W 4792.63 1271.0 187.3 1260.59 S 162.15 W 4806.06 1291.9 187.4` 1281.07 S 167.15 W 4819.49 1312.9 187.5 1301.54 S ' 172.20 W 4832.94 1333.8 187.6 1322:00 S 177.24 W 4846.29 13549 187.7 1342.53 S 182.30 W 6 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Dri11 Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhu e Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZON TAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg.. feet 25 8. 5400.00 58.00 193.82 S 13 49 W 0.03 4859.53 ,1375.9 187.8 1363.12 S 187.37W 5425.00 58.29 193.81 S 13 49 W 0.29 4872.72 1397.1 187.9 1383.74 S 192.44 W 5450.00 58.20 194.00 S 14 0 W 0.19 4885.88 1418.2 188.0 1404.38 S 197.55 W 5475.00 58.35 194.11 S 14 7 W 0.18 4899.03 1439.3 188.1 1425.00 S 202.72 W 5500.00 58.52 194.41 S 14 25 W .0.30 4912.12 1460.5 188.2 1445.65 S 207:97 W 5525.00 58.79 194.61 S 14 37 W 0.32 4925.12 1481.8 1$8.3 1466.32 S 213.32 W 5550.00 59.06 194.58 S 14 35 W 0.28 4938.03. 1503.0 .188.4 1487.04 S 218.71.W 5575.00 59.37 194.81 S 14 49 W 0.36 4950.82 1524.4 188.5 1507.81 S 224.16W 5600.00 59.02 194.98 S 14 59 W 0.37 4963.62 1545.7 188.5 1528.56 S 229.68 W 5625.00. 58.90 194.85 S 14 51 W 0.16 4976.51 1567.0 :188.6 1549.26 S 235.19 W 5650.00 59.34 194.81 S 14 49 W 0.44 4989.34 1588.3 188.7 1570.00 S 240:69W 5675.00. .59.54 194.97 S 14 58 W 0.24 5002.05 1609.8 188.8 1590.81 S 246.22W 5700.00 59.73 195.18 S 15 11 W 0.26 5014.69 1631.2 .188.9 1611.64 S 251.83W .5725.00 60.29 195.32 S 15 19 W .0.58 5027.19 1652.7 189.0 1632.53 S 257.52W 5750.00 59.70 195.37 S 15 22 W 0.59 ..5039.69 1674.2 189.0 1653.41.. S _263.25 W 5775.00 60.07 195.39 S 15 23 W 0.36 5052.23 1695.7 189.1 1674.26 S 268.99 W 5800:00 60.52 195.32 S 15 19 W 0.46 5064.62 1717.3 "189.2 1695.19 S 274.74 W 5825:00 60.35 195.39 S 15 23 W 0.18 5076.96 1738.9 189.3 1716.16 $ 280.SOW 5850.00 60.16 195.39 S 15 24 W 0.19 5089.36 1760.5 189.4 1737.09 S 286.26 W 5875.00 60.06 195.34 S 15 21 W 0.11 5101.82 -1782.1 189.4` 1757.99' S 292.OOW 5900.00 60.31 .195.26 S 15 16 W 0.26 5114.25 1803.7 189.5 1778:91 S ' 297.73 W 5925.00 60.20 195.20 S 15 12 W 0.11 5126.65 1825.3 189.6 1799.86 S 303:43 W 3950.00 60.11 195.20 S 15 12 W 0.10 5139.09 1846.8 189.6 1820.78 S 309.11 W 5975.00 60.35 195.24 S 15 14 W 0.25 5151.51 1868.4 189.7 1841.72 S 314:81 W 7 BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job.Number: AK0708G 142 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE DOGLEG BEARING :SEVERITY deg. min. deg./ 25 ft. VERTICAL DEPTH feet CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 6000.00 59.97 195.16 S 15 10 W 0.39 6025.00 59.56 195.03 S 15 2 W 0.43 6050.00 59.59 195.11 S 15 6 W 0.07 6075.00 59.93 195.01 S 15 0 W 0.35 6100.00 60.43 195.10 S 15 6 W 0.51 6125.00 59.67 195.11 S 15 6 W 0.76 6150.00 59.70 195.15 S 15 9 W 0.05 6175.00 60.09 195.14 S 15 8 W 0.39 6200.00 59.79 :195.20 S 15 12 W 0.31 6225.00 59.57 195.35 S 15 21 W 0.25 6250.00 60.45 195.21 S 15 12 W 0.89 6275.00 60.49 .195.14. S 15 8 W 0.07 6300.00 60.25 195.34 S 15 21 W 0.30 6325.00 60.23 195.57 S 15 34 W 0.20 6350:00 60.62 195.51 S 15 30 W 0.38 6375.00 60.92 195.62 S 15 37 W 0.32 6400.00 61.30 195.66 S 15 39 W 0.39 6425.00 61.75 195.55 S 15 33 W 0.46 6450.00 61.97 195.62 S 15 37 W 0.23 6475.00 62.22 195.60 S 15 36 W 0.25 6500.00` 62.42 .195.71 S 15 42 W 0.22 6525.00. 62.15 195.51 S 15 31 W 0.32 6550.00 63.39 193.04 S 13 3 W 2.52 6575.00 63.22 191.27 S 11 16 W 1.59 6600.00 62.67 188.59 S 8 35 W 2.45 5163.94 1890.0 189.8 1862.65 S 320.SOW 5176.53 •1911.5 189.8 1883.50 S 326.12 W 5189.19 1933.0 .189.9 1904.32 S 331.73 W 5201.78 .1954.5 189.9 1925.18 S 337.34 W 5214.21 1976.1 190.0 1946.12 S 342:97 W 5226.69 1997.7 190.1 - 1967.04 S ' 348.61 W 5239.31 2019.2 190.1 1987.87 S 354.25 W 5251.85 2040.7 190.2 2008.75 S 359.90 W 5264.37 2062.3 190.2 2029.63 S 365.56 W 5277.00 2083.8 190.3 2050.45 S 371.25 W 5289.49 2105.4 190.3 2071.33 S 376.95 W 5301.81 2127.0 190.4 2092.33 S 382.65 W 5314.17 2148.7 :.190.4 2113.30 S 388.36 W .:5326.58 2170.3 190.5 2134.22 S 394s14W 5338.92 2192.0 190.5 2155.16 S 399.97 W 5351.13 2213.7 190.6 2176.18 S 405.82 W 5363.21 2235.5 190.6 2197.26 S 411.72 W 5375.13 2257.4 190.7 2218.42 S 417.63W 5386.92 2279.4 190.7 2239.66 S 423.55 W 5398.62 2301.4 190.8 2260.94 S 429.50 W 5410.23 2323.4 190.8 2282.25 _S 435.47 W 5421.86 2345.5 190:8 2303.57 S 441.43 W 5433.30 -2367.7 ' 190.9 2325.11 S 446.91 W 5444.53 2390.0 1909 2346.94 S 451.61 W 5455.91 2412.3 190.9 2368.87 S 455.45 W 8 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Dri11 Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg, deg. min. deg./ feet feet deg. feet 25 ft. 6625.00 61.70 186.54 S 6 32 W 2.06 5467.57 2434.3 190.9 2390.79 S 458.36 W 6650.00 61.00 185.62 S 5 37 W 1.07 5479.56 2456.2 190.8 2412.60 S 460.68 W b675.00 60.43 .184.73 S 4 44 W 0.96 5491.79 2477.9 190.8 2434.32 S 462:65 W 6700.00 60.13 183.60 S 3 36 W 1.03 5504.18 2499.5 190.7 2455.97 S 464:23 W 6725.00 59.91 182.47 S 2 28 W 1.00 5516.67 2520.9 190.6 2477.60 S 465.38 W 6750.00 59.40 .181.53 S 1 32 W 0.96 5529:30 2542.3 190.6 2499.15 S 466.13 W 6775.00 59.04 180.81 S 0 49 W 0.72 5542.09 2563.4 190.5 2520.63 S 466.57W 6800.00 58.85 179.98 S 0 1 E 0.73 5554.99 2584.5 190.4 2542.05 S 466.72W 6825.00 58.43 179.09 S 0 55 E 0.87 5568.00. 2605.5 -190.3 2563.39 S 466.55 W 6850.00 .57.95 177.71 S 2 18 E 1.27 5581.18 2626.3 190.2 2584.63 S 465.95 W 6875.00 57.06 174.95 S 5 3 E 2.49 5594.62 2646.8 190.1 2605.67 S 464.61 W 6900.00 57.20 172.59 S 7 24 E 1.98 5608.19. 2666.9 190.0 2626.54 S 46233 W 6925.00 57.54 171.95 S 8 3 E 0.64 5621.67 2687.0 189.8 2647.40 S 459.49 W 6950:00 57.75 171.94 S 8 4 E 0.21 5635.05. 2707.1 189.7 2668.31 S 456.53 W 6975.00 58.07 172.38 S 7 37 E 0.50 5648.33 2727.3 ' 189.6 2689.29 S 453.65 W 7000.00 58.08 173.17 S 6 50 E 0.66 5661.55 2747.6 189.4 2710:34 S 450.98 W 7025.00 57.98 173.97 S 6 2 E 0.69 ..5674.79. 2768.0 189.3 ` 2731:42 S 448.60 W 7050.00 57.89 174.47 S 5 32 E 0.43 5688.06 2788.5 189.2 2752.49 S 446.47 W 7075:00 57.18 174.33 S S 40 E 0.72 5701.48 2808:9 189.1 2773:49 S 444.41 W 7100.00 56.18 .173.76 S 6 14 E 1.10 5715.21 2829.0 "189.0 2794.26 S 442.24W 7125.00 54.96 174.08 S 5 55 E 1.25 5729.34 -2849.0 188.9 2814.77 S 440.06W 7150.00 53.62 174.53 S 5 28 E 1.39 5743.93 2868.6 188.8 2834.97 S 438.04W 7175.00 52.39 174.89 ` S 5 7 `E 1.27 5758.98 2888.0 188.7 2854.85 S 436.20 W 7200.00 51.18 175.45 S 4 33 E 1.29 5774.45: 2907.1 188.6- 2874.42 S 434.54W 9 BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. 7225.00 49.84 7250.00 48.39 :7275.00 46.67 7300.00 45.40 7325.00 44.58 7350.00 44.04 7375.00 42.47 7400.00 41.02 7425.00 39.54 7450.00 38.41 7475.00 36.91 7500.00 35.89 7525.00 34.67 .7550.00 33.25 7575.00 31.76 7600.00 30.28 7625.00 28.82 7650.00 27.36 7675.00 26.12 7700.00 25.36 .7725.00 24.80 7750.00 24.49 7775.00 24.35 7800.00 23.83 A Gyrodata Directional Survey BORE HOLE DOGLEG BEARING SEVERITY deg. min. deg./ 25 ft. 177.12 S 2 53 E 178.00 S 2 0 E 178.69 S 1 19 E 179.90 S 0 6 E 181.05 S 1 3 W 182.68 S 2 41 W 183.31 S 3 18 W 183.92 S 3 55 W 185.28 S 5 17 W 186.27 S 6 16 W 188.14 S 8 8 W 189.46 S 9 28 W 191.24 S 11 14 W 193.06 S 13 3 W 194.41 S 14 25 W 195.84 S 15 50 W 197.64 S 17 38 W 199.62 S 19- 37 W 202.89 S 22 54 W 205.09 S 25 5 W 208.17. S 28 10 W :210.40 S 30 24 W 213.69 S 33 41 W 216.84 S 36 50 W VERTICAL CLOSURE DEPTH DIST. AZIMUTH feet feet deg. HORIZONTAL COORDINATES feet 1.86 5790.34 2925.9 188.5 2893.67 S 433.29 W 1.59 5806.71 2944.5 188.4 2912.55 S 432.49 W 1.80 5823.59 2962.6 188.4 2930.99 S 431.95 W 1.54 5840.94 2980.4 188.3 2948.98 S 431.73 W 1.16 5858.62 2997.9 188.3 2966.65 S 431.88 W 1.26 5876.51 3015.3 188.2 2984.11 S 432.44 W 1.63 3894.72 3032.3 188.2 3001.22 S 433.33W 1.51 5913.37 3048.9 188.2 3017.83 S 434.38 W 1.73 5932.44 3065.1 .188.2 3033.94 S 435.67 W 1.28 5951.88 3080.8 188.2 3049.58 S 437.25 W 1.89 5971.67 3096.0 188.2 3064.73 S 439.16W 1.29 5991.79 3110.9 188.2. 3079.39 S 441.43 W 1.59 6012.20 3125.3 " 188.2 3093:60 S 444.02 W 1.75 6032.94 3139.2 188.2 3107.25 S 446.96 W 1.66 6054.02 3152.6 188.2 3120.30 S 450:14W 1.65 6075.44 3165.4 188.2 3132.73 S 453.50 W 1.71 6097.19 3177.6 188.3 3144.54 S 457.05 W 1.73 6119.25 3189.2 188.3 3155.70 S 460.80 W 1.92 6141.57 3200.1 188.4 3166.1$ S 464.87 W 1.22 6164.09 3210.6 188.4 3176.10 S 469.28 W 1.42 6186.74 3220.6 .188.5 3185.57 S 474.03 W -0.98 6209.46 3230.4 188.5 3194.66 S 479.13 W 1.37 6232.22 3239.9 188.6 3203.42 S - 484.61 W 1.38 6255.05 3249.0. 188.7 ' 3211.75 S 490:49W 10 BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH .DEPTH feet deg. deg. 7825.00 23.39 7850.00 22.61 7875.00 21.80 7900.00 20.86 7925.00 20.30 7950.00 20.12 7975.00 20.18 8000.00 20.19 8025.00 20.26 8050:00 20.16 8075.00 20.32 8100.00 20.30 8125:00 20.20 '8150.00 19.93 8175.00.. 19.92 8200.00 19.84 8225:00 19.71 8250.00 20.02 8275:00 19.25 8300.00 19.25 8325.00 19.32 5350.00 19.66 8375:00 20.27 .8400.00 20.62 A Gyrodata Directional Survey BORE HOLE BEARING deg. min. .DOGLEG SEVERITY deg./ 25 ft. VERTICAL CLOSURE HORIZONTAL DEPTH DIST. AZIMUTH COORDINATES feet feet deg. feet 6277.95 3257.7 188.8 3219.64 S 496.6 W 6300.97 3266.0 188.9 3227.05 S 503.02W 6324.1 T 3273.9 189.0. 3233.97 S 509.45 W 6347.40 3281..2 189.0 3240.43 S 515:85 W 6370.81 3288.1 189.1 3246.38 S 522.31'W 6394.27 3294.7 189.2 3251.92 S 528.94`W 6417.74 3300.8 189.3 3256.96 S 535.91 W 6441.20 3306.3 189.5 3261.36 S 543.32 W 6464.66 3311.3 189.6 3265.15 S 551.09 W 6488.13 3315.8 189:7 3268:31 S 559.12W 6511.58 3319.7 189.8 3270:83 S 567.38 W 6535.03 3322.9 190.0. 3272:65 S 575.86 W 6558.49. 3325.7 190.1 3273:93 S 584.41 W 6581.97 3328.2 190.3 3274:91 S 592.93 W 6605.47 3330.5 190.4 3275:78 S 601.41 W 6628.98 3333.0 190.5 3276.70 S 609.86 W 6652.51 3335.5 190.7 3277.66 S 618.26W 6676.02 3338.0 .190.8 3278.68 S 626.70W 6699.57 3340.5 191.0 3279.62 S 635:04 W 6723.17 3343.1 191.1 3280.60 S 643:23 W 6746.77 3345.7 T91.2 3281.67 S 651.41 W $770.34 3348.4 191.4 _ 3282.73 S 659.69 W - 6793.83' 3351:1 -191.5 3283:82 S 668.15W 6817.26 3353.9 191.6 3284.93 S 676.81 W 219.15 S 39 9 W 222.18 S 42 11 W 223.65 S 43 39 W 225.84 S 45 50 W 229.00 S 49 0 W 231.27 S 51 16 W 236.90 S 56 54 W 241.70 S 61 42 W 246.34 S 66 21 W 250.71 S 70 43 W 255.27 S 75 16 W 260.53 S 80 32 W 262.40 S 52 24 W 264.57 S 84 34 W .263.70 S 83 42 W 263.93 S 83 56 W 262.98 S 82 59 W .263.15 S 83 9 W 264.03 S 84 2 W 262.33 S 82 20 W 262.77 S 82 46 W 262.65 S 82 39 W 262.72 S 82 43 W 262.59 S 82 36 W 1.03 1.42 0.98 1.23 1.24 0.81 1.94 1.65 1.61 1.51 1.59 1.82 0.65 0.79 0.30 0.11 0.35 0.32 0.83 0.56 0.16 0.35 -0.61 0.35 11 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet fleg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 8425.00 20.86 262.65 S 82 39 W 0.24 6840.64 3356.8 191.8. 3286.07 S 685.59 W 8450.00 20.85 262.76 S 82 45 W 0.04 6864.00 3359.7 191.9 3287.20 S 694.42 W 8475.00 21.18 262.81 S 82 49 W 0.33 6887.34 3362.7 192.1 3288.33 S 703.31W 8500.00 21.13 263.41 S 83 24 W 0.22 6910.65 3365.6 192.2 3289.41. S 712.27 W 8525.00 20.86 264.32 S 84 19 W 0.43 6933.99. 3368.5 192.4 3290.37 S 721,18 W 8550.00. 21.59 263.82 S 83 49 W 0.75 6957.30 3371.3 192.5 3291.30 S 730;18 W 8575.00 21.89 .263.81 S 83 49 W 0.31 6980.52 3374.3 192.7 3292.30 S 73939 W 8600.00 21.93 264.39 S 84 23 W 0.22 7003.71 3377.3 192.8 3293.26 S 748.67 W 8625.00 21.89 264.13 S 84 8 W -0.10 7026.91 3380.3 193.0 3294.19 S 757.95 W 8650.00 21.18 263.81 S 83 49 W 0.72 7050,16 3383.3 193.1 3295.16 S 767.07W 8675.00 20.71 264.87 S 84 52 W 0.60 7073.51 3386.1. 193.2 3296.04 S 775.97 W 8700.00 20.93 264.52 S 84 31 W 0.26 7096.88 3389.0 -193.4 3296.86 S 784.82W 8725.00 20.89 264.27 S 84 16 W 0.10 7120.23 3391.9 193.5 3297.73 S 793.70 W 8750.00 21.63 264.42 S 84 25 W 0.75 7143.53 3394.9 193.7 3298.63 S 802.72 W 8775.00 21.80 264.59 S 84 35 W 0.18 7166.75 3397.9 193.8 3299.51 S 811.92 W 8800.00 21.74 265.57 S 85 34 W 0.37 7189.97 3400.9 194.0 3300.31 S $21.16 W 8825:00 21.93 264.51 S 84 31 W 0.44 7213.18 3404.0 194.1 3301.11 S 830.42W 8850.00 22.37 263.66 S 83 40 W 0.55 .7236.33 3407.2 194.3 3302.08 S 839.80 W 8875.00 22.78 264.37 S 84 22 W 0.49 7259.42 3410.5 194.4 3303.08 S 849.34 W 8900.00 21.92 264.67 S 84 40 W 0.87 7282.54 3413.8 194.6 3303:99 S 858,80W 8925x00 21.88 .263.38 S 83 23 W 0.48 7305.74 3417.1 194.7 3304.96 S 86808W 8950:00. 21.89 264.15 S 84 9 W 0.29 7328.93 3420.4 194.9 3305.97 S 877.34 W 8975.00 21.90 264.44 S 84 26 W 0.11 7352.13 3423.7 195.0 3306.90 S 886.62 W 9000.00 22.42 263.67 S 83 40 W 0.59 7375.28 3427.1 195.2 3307.88 S 896.00 W 12 BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE. DOGLEG DEPTH BEARING SEVERITY feet deg.. deg. deg. min. deg./ 25 ft. 9025.00 23.11 263.73 S 83 44 W 0.69 9050.00 23.88 263.22 S 83 13 W 0.80 9075.00 24.41 263.39 S 83 23 W -0.53 9100.00 24.90 263.49 S 83 30 W 0.49 9125.00 25.82 263.06 S 83 4 W 0.95 9150.00 26.68 263.03 S 83 2 W 0.86 9175.00 27.55 262.98 S 82 59 W 0.86 9200.00 28.23 262.86 S 82 52 W 0.69 9225.00 29.12 263.13 S 83 8 W 0.90 9250.00 30.09 263.41 S 83 24 W 0.98 9275.00 31.11 263.56 S 83 33 W 1.03 9300.00 32.59 263.58 S 83 35 W 1.48 9325.00 33.95 263.77 S 83 46 W 1.37 9350.00 35.36 263.84 S 83 50 W 1.41 9375.00 36.34 264.11 S 84 6 W 0.99 9400.00 37.36 264.56 S 84 33 W 1.06 9425:00 38.86 264.70 S 84 42 W 1.50 9450.00 40.22 .264.52 S 84 31 W 1.36 9475.00 41.55 263.76 S 83 46 W 1.43 9500.00 ~ 43.08 263.22 S 83 13 W 1.57 9525.00 44.87 263.24.. S 83 14 W 1.79 9550.00 47.18 .'263.29 S 83 18 W 2.31 9575.00 49.00 263.58 S 83 35 W 1.83 9600.00 51.22 264.32 S 84 19 W 2.30 VERTICAL DEPTH feet CLOSURE HORIZONTAL DIST. AZIMUTH COORDINATES feet deg. feet 7398.34 3430.6 195.3 3308.94 S 905.6.1 W 7421.26 3434.3 195.5 3310.07 S 915.52 W .7444.08 3438.2 195.6 3311.27 S 925.67 W 7466.80 3442.2 195.8 3312.46 S 936.03 W 7489.39 3446.3 195.9 3313.71 S 946.67 W 7511.81 3450.6 196.1 3315.05 S 957.64 W .7534.06 3455.1 .196.3 3316.44 S 968.95 W 7556.16 3459.7 496.5 3317.88 S 980.56 W 7578.09 3464.5 196.6 3319.34 S 992.46 W 7599.83 3469.5 .196.8.. 3320.79 S 1004.73 W 7621.35 .3474.5 197.0 3322.23 S 1017.37 W 7642.58 3479.8 197.2 3323.71 S 1030:48 W 7663.48 3485.3 197.4 3325.22 S 1044.11 W 7684.05 3491.0 197.6 3326.76 S 1058.24 W 7704.31 3496.9 197.9 3328.29 S 1072.80 W 7724.32 3502.9 198.1. 3329.77 S 1087.72 W 7743.99 3509.1 198.3 3331.22 S 1103.08 W 7763.27 3515.5 198.6 3332.71 S 1118.93 W 7782.17 3522.3 198.8 3334.39 S 1135.20W 7800.65 3529.6 199.0 3336.29 S 1151.93 W 7818.64 3537.2 194.3 3338.34 S '1169.16W 7836.00 3545.1 199:6 3340'.45 S 1187.03 W 7852.70 3553.3 199.8 3342.58 S 1205.51 W 7868.73 3561.7 200.1 3344.60 S 1224.58 W 13 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg.l feet feet deg. feet 25 ft. 9625.00 52.43 264.52 S 84 31 W 1.22 7884.18 3570.3 200.4 3346.51 S 1244.14 W 9650.00 53.10 264.74 S 84 44 W 0.69 7899.31 3579.0 200.7. 3348.37 S 1263.96 W 9675.00 53.37 264.66 S 84 40 W 0.28 7914.27 3587.8 201:0 3350.22 S 1283.90 W 9700.00 53.85 264.59 S 84 36 W 0.48 7929.11 3596.8 201.3 3352.10 S 1303:94W 9725.00 54.43 264.86 S 84 52 W 0.62 7943.75 3605.9 201.5 3353.97 S 1324.11 W 9750.00 54.16 .264.52 S 84 31 W 0.39 .7958.34 3615.1 201.8 3355.85 S 1344.33 W 9775.00 .54.65 264.51 S 84 30 W 0.49 7972.89 3624.5 202.1 3357.79 S 1364.56 W 9800.00 56.11 264.29 S 84 17 W 1.47 .7987.10 3634.1 202.4 3359.80 S 1385.04 W .9825.00 56.97 264.07 S 84 4 W 0.88 $000.88 3644.0 202.7 3361.92 S 1405.78 W 9850.00 57.16 .264.08 S 84 5 W 0.18 8014.47 3b54.1 203.0 3364.08 S 1426.65 W 9875.00 56.95 264.25 S 84 15 W 0.25 8028.07 3664.2 203.3 3366.21 S 1447.53 W 9900.00 56.95 263.83 S 83 50 W 0.35 8041.70 3674.5 203.6 3368.39 S 1468:37 W 9925.00 57.14 264.00 S 84 0 W 0.24 8055.30 3684.9 203.8 3370.61 S 1489:23 W 9950.00. 56.24 .264.37 S 84 22 W 0.95 8069.03 3695.3. 204.1 3372.73 S 1510.01 W 9975.00 56.49 .264.16 S 84 10 W 0.30 8082.88 3705.7 204.4 3374.81 S 1530.72 W 10000.00 56.75 263.89 S 83 53 W 0.35 8096.64 3716.3 204.7 3376.98 S 1551.48 W 10025.00 55.85 264.77 S 84 46 W 1.16 8110.51 3726.9 205.0 3379.04 S 1572.18 W 10050.00 55.75 264.18 S 84 11 W 0.50 8124.56 3737.4 205.2 338L.03 S 159276W 10075.00 56.07 .264.21 S 84 13 W 0.33 8138.57 3748.1 -205.5 3383.13 S 1613.36W 10100.00 55.83 264.45 S 84 27 W 0.31 8152.57 3758.9 205.8 3385.17 S 1633:97W 10125.00 55.89 264.55 S 84 33 W 0.10 -8166.60- 3769.7 206.0 3387.15 S 1654.57W 10150.00 56.20 264.63 S 84 38 W 0.31 8180.56 3780.5 206.3 3389:T1 S 1675.21 W 10175:00 56.96 264.57. S 84 34 W 0.76 8194:33 3791.5 206.6 3391:07 S 1695.99 W 10200.00 57.57 264.56 S 84 34 W 0.61 8207.85 3802.7 206.8 3393.06 S 1716.92W 10225.00 57.25 265.03 S 85 2 W 0.51 8221.32 3813.9 207.1.. 3394.97 S 1737.90'W 14 BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-112" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH DEPTH feet deg: deg. 10250:00 57.27 265.11 S 85 6 W 0.07 10275.00 57.46 264.96 S 84 58 W 0.22 .10300.00 56.91 265.64 S 85 39 W 0.79 10325.00. 57.13 265.51 S 85 31 W 0.25 10350.00 57.06 264.70 S 84 42 W 0.69 10375.00 57.17 263.98 S 83 59 W 0.61 10400.00 57.05 264.36 S 84 22 W 0.34 10425.00 57.01 264.22 S 84 13 W 0.12 10450.00 56.96 263.30 S 83 18 W 0.78 10475.00 56.62 262.08 5 82 5 W 1.08 10500.00 .56.74 261.42 S 81 25 W 0.57 10525.00 56.78 262.40 S 82 24 W 0.82 10550:00 56.26 .261.59 S 81 35 W 0.85 10575.00 56.78 262.20 5 82 12 W 0.73 10600.00 55.77 262.16 S 82 9 W 1.01 .10625.00 56.33 262.04 S 82 3 W 0.56 10650.00 55.94 261.14 5 81 9 W 0.84 10675.00. 55.87 260.58 S 80 35 W 0.47 10700.00 55.46 261.43 5 81 26 W 0.82 10725.00 55.72 261.30 S 81 18 W 0.29 10750.00 54.88 260.76 S 80 46 W 0.96 10775.00 54.88 261.60 S 81 36 W 0.69 10800.00 54.57 261.04 S 81 3 W 0.55 10825.00 54.70 261.69 S 81 41 W 0.54 A Gyrodata Directional Survey BORE HOLE DOGLEG VERTICAL CLOSURE BEARING SEVERITY DEPTH DIST. AZIMUTH deg. min. deg./ feet feet deg. 25 ft. .HORIZONTAL , COORDINATES feet 8234.84 3825.1 207.4 3396.78 S 1758.85 W .8248.32 .3836.4 207.6 3398.61 S 1779.82 W 8261.86 3847.7 207.9 3400.33 S 1800.76W 8275.47 3859.0 208.2 3401.94 S 1821.67 W 8289.05 3870.5 208.4 3403.73 S 1842.59 W 8302.63 3882.3 208.7 3405.81 S 1863:48 W 8316.20 3894.2 208.9 3407.94 S 1884.36W 8329.80 3906.2 209.2 3410.03 S 1905.23 W 8343.42 3918.4 209.4 3412.30 S 1926.07 W 8357.12 3930.9 209.7 3414.97 S 1946.82 W 8370.85 3943.8 209.9 3417.97 S 1967.49 W 8384.55 3956.7 210.2 3420.91 S 1988.19 W 839'8.35 3969.6 210.4 3423.81 S 2008.84 W 8412.14 3982.6 .210.6 3426.75 S 2029.49 W 8426.01 3995:6 210.9 3429.58 S 2050.09 W 8439.98 4008.6 211.1 3432.43 S 2070.63W 8453.91 4021.9 211.3 3435:47 S 2091.16W .8467.92. 4035.3 211.6- 3438.75 S 2111:60 W 8482.02 4048:8 211.8 3441.98 S 2131.99 W 8496.15 4062.2 212.0 3445.08 S 2152.38 W 8510.38 4075.7 - 212.2 3448.28 S 2172.69 W 8524.77 4089.1 212.4 3451.42 S 2192.89 W 8539.20 4102.6 .212:6 3454.50 S 2213.07 W 8553.67 4116.1 212.9 3457.56 S 2233.22 W 15 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: Drill Site 6 Well: 06-06B, 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska Job Number: AK0708G 142 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. 10850.00 55.52 262.53 S 82 32 W 10875.00 55.50 263.04 S 83 2 W 10900.00 55.12 263.13 S 83 8 W 10925.00 55.72 263.83 S 83 50 W 10950.00 56.61 264.64 S 84 38 W 10975.00 57.10 265.01 S 85 1 W 11000.00 57.39 265.83 S 85 50 W 11025.00 56.69 265.14 S 85 8 W 11050.00 .56.77 265.66 S 85 40 W 11075.00 56.84 265.17 S 85 10 W 11100.00 58.96 265.32 S 85 19 W 11125.00 63.59 266.22 S 86 13 W Final Station Closure: Distance: 4276.39 ft Az: 215.49 deg. DOGLEG VERTICAL :CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 25 ft. 1.07 8567.97 4129.5 213.1 346037 S 2253.54 W 0.42 8582.13 .4142.8 213.3 3462.96 S 2273.98 W 0.39 8596.35 4156.1 213.5 3465.44 S 2294.39 W .0.83 8610.54 .4169.4 .213.7 3467.78 S 2314.84 W 1.11 8624.46 4182.6 213.9 .3469.86 S 2335.50 W 0.58 8638.13 4195.9 214.2 3471.75 S 2356.34 W 0.75 8651.66 4209.1 214.4 3473.43 S 2377.30 W 0.91 .8665.26 4222.3 214.6. 3475.08 S 2398.21 W 0.44 8678.98 4235.5 214.8 3476.75 S 2419.05 W 0.42 8692.66 4248.8 215.0 3478.42 S 2439.90 W 2.12 8705.95 4262.4 215.3 3480.18 S 2461.00 W 4.70 8717.96 4276.4 215.5 3481.79 S 2482.86 W 16 - BP Exploration (Alaska) WeIL• Drill Site 6 06-066 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska 0 -500 -1000 .. -1500 z z -2000 -250C -300( -350( Interp Inrun Gyrodata AK0708G_142 DEFINITIVE B L M TTOM HOLE CATED :11125.00 -~snn -2 000 -1500 -1 000 -5 00 0 • FASTING (ft) 1 BP Exploration (Alaska) Interp Inrun Well: DriII Site 6 06-066 4-1/2" Tubing Gyrodata Location; Mast Truck, Prudhue Bay, Alaska AK0708G_142 DEFINITIVE ~, 10 9 8 7 u~ N rn 6 v ~ B L TTOM H CATED LE w 5 w w 4; J 0 3 2 1 0 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 MEASURED DEPTH (ft) BP Exploration (Alaska) Well: Drill Site 6 06-06B 4-i/2" Tubing Location; Mast Truck, Prudhue Bay, Alaska 65 60 55 50 45 40 z O a 35 z J Z 30 25 20 15 10 5 0 Interp Inrun Gyrodata AK0708G_142 DEFINITIVE OTTO LOCATE .HOLE MD: 11 25.00 0 1000 20 00 30 00 40 00 50 00 60 00 70 00 80 00 90 00 100 00 110 00 120 00. MEASURED DEPTH (ft) • - BP Exploration (Alaska) Well: Drill Site 6 06-06B 4-1/2" Tubing Location: Mast Truck, Prudhue Bay, Alaska H N 260 240 220 200 180 160 140 120 100 80 60 40 20 0 340 320 300 Interp Inrun Gyrodata AI<0708G_142 DEFINITIVE ,0 LOCAT D .0 .0 .0 .0- .0 0 .0 .0 :'0 .0 .0 .0 .0 .0 .0 A 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 MEASURED DEPTH (ft) s - heet Survey QC - RGS CT Acceptance S FIELD AND SURVEY INFORMATION Operator BP EXPLORATION AK Field /Platform Mast Truck Well Number Drill Site 6 066 Survey section From ' 3198.49 ft. to 11145.00 ft. Date. 7/28/2008 Gyrodata Job No AK0708G_142 Gyrodata Surveyors Scott Smith Job Objective High Accuracy Gyro Survey cAAU ~ ~. /.L~ -- - - - - - -- In Sped QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to highertemperature specification 2. Resurvey,with backup tool 3. Resurvey ~HoY section at higher speed Roll test data within specification Contact Duty Engineer to .discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve with back u tool Contact Duty Engineer #o discuss options: Toolface rate within specification Yes Resurvey section from previous bias .check Investi ate and comment if effects are ne li ible Contact Duty Engineer to diswss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Qi66 (OPS SUR-MA-003) 13th Nov 03 /Revision 12 Page 1 of I AK0708G_142 Survey QC - RGS- alysis Sheet ~y SURVEY QUALITY CONTROL -DATA ANALYSIS REFERENCE SYSTEMS Grid S stem Grid Correction 0.00 Azimuth reference: Grid True North TRUE NORTH Vertical reference: RKB MS Other RKB If other ive details . a...,........, De th .0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Norttiin s 0.00 Eastin s 0.00 Latitude 70.2430 Az. Ref: Grid rue T Grid Corrected Y N? N Descri tion CALIBRATION Tool Number 3089 I Calibration Date 19/26/07 I OPERATING TEMPERATURE Calibration ran a From 70.28 To 120.71 G ro o eratin ran a From 76.14 To 92.10 Sec' -Within calbration ran e FIELD ROLL TEST Onl valid on fixed structures When not ossible in ut roll test data rformed after return to base Cal value Pre 'ob offset st 'ob offset Abs dif.cal. ost Abs dif. re. ost Sec' Accel Scale 0.000000 0.000000 N A Cal Post - 0.00015 Mass Unbalance 0.00 0.00 N A .Pre Post - 0.4° hr De th A rox 3201.25 No of stns 10 Sec' -Min No. - 6 Azimuth Mean 177.34 Std deviation 0.08 Sec' - Azi SD 0.2° Inclination Mean 15.76 Std deviation 0.00 Sec' -Inc SD 0.1° Earth Horizontal Rate Mean Abs mess-theor O.Ol Std deviation 0.00 5 ec' -See 167 DRIFT TUNE Residual x ro bias Mean -0.001 Std dev' 0.001 Sec's -Mean and SD - 0.333 hr Residual ro bias Mean -0.000 Std dev' 0.000 Sec's -Mean and SD - 0.333 hr TOOLFACE RATE Maximum toolface rate 14.58 Sec' - 400 sec IN OUT GOMPAIii5~7n Inclination Difference ALl' ry w Mean ar ina. caa- -0.00 Std dev' 0.06 Sec's - Casin 0.3° Drill i e 0.3° Azimuth Difference Mean 0.07 Std dev' 0.12 Sec's - Casin 0.5° Drill i e 0.75° Lateral Dive ence 1000 0.93 Sec - 5.0 1000 Vertical Dive en 1000 0.04 Sec' - 2.0 1000 vcr ^ n ~.v^~ ^ ..vv Wireline Com an Shlumber er Line a 15 32 Encoder SF Schlumber er Max De th 11145 CCL Corrected Yes verified Zero De th Ri u RKB reference 65.8 FT AMSL Rezero De th 15.8 Given u 'oint de th Measured PJ Strech cor. At TD divided b TD 1000 1.48 Sec' - 1.5/1000 Dif. Between ri u and rezero de the divided b TD 1000 1.42 Sec' - 2.0(1000 Dif. Between iven and meas de th divided b meas 1000 1.48 Sec' - 2.0/1000 SURV-Q165 (OPS SUR-MA-010) 22nd Tan 2004 /Revision 29 Page 1 of i AK0708G_342 Survey QC - RGS- ecification Sheet SURVEY QUALITY CONTROL -.SPECIFICATION DATA Gyro. Compass Reading /Station Raw inclination Raw Azimuth Abs (ERMeas-ER~n~eo) 65 15.76 177.25 0.0068 66 15.76 177.44 0.0013 67 15.76 177,38 0.0067 68 15.76 177.24 0.0100. 69 15.76 177.25 0.0063 70 15.76 177.25 0.0022. 71 15.76 177.35 0.0099 72 15.76 177.33 D.0084 73 15.76 177..43 0.0073 74 15.76 177.46 0.0050 Average 15.76 177.34 0.0064 Tolerance on Average* 0:0878 Standard Deviation 0.00 0.08 0.0027 Tolerance on St. Dev.** 0.10 p,2o 0.0467 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/CosI) * ~[(COSA*SinI*0.1) +0.08 1 °/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance Is given by (i/CosI) *~t[(CosA*SinI*0.1) + 00 S /(~] °/hr vDrift Tune V Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1381.81 6000.63 59.68 195.02 0.000 -0.001 0.000 -0.000 2 1442.25 8802.17 22.12 264.42 0.000 0.000 0.000 -0.001 3 1185.50 11103.18 65.75 266.56 0.000 0.000 -0.000 -0.000 4 304.10 11144.92 69.37 268.15 0.001 -0.000 -0.001 0.001 5 1291.55 8801.76 22.35 263.50 0.000 -0.000 0.000 0.000 6 1523.25 6000.21 59.47 195.02 .0.000 -0.001 0.000 0.000 7 1336.00 3553.87 22.31 182.86 O.d00 -0.002 0.000 -0.000 8 395.38 3198.49 17.06 178.18 0.000 -0.001 -0.000 -0.001 Average 0.000 -0.001 -0.000 -0.000 Standard Deviation 0.000 0.001 0.000 0.000. Tolerance for both the Average and the Standard Deviation 0.0330/hr 0.0330/hr 0.033/hr 0.0330/hr Depth Corrected Inclination Corrected Azimuth I Inrun * Outrun * Difference Inrun * Outrun * Difference 100.00 0.41 0.10 0.32 116.47 60.62 55.85 200.00 0.32 0.19 0.13 76.28 121.25 -44.97 300.00 0.27 0.24 0.03 29.44 :138.24. -108.80 SURV-Q367 (OPS 5UR-MA-003) 19a' Nov 03 /Rev 15 Pape i of 9 AK0708G_142 Survey QC - RGS- ecification Sheet 400.00 .0.27 0.24 0.03 125.44 120.23 5.20 500.00 0.28 0.25 0.03 23.50, 116.05 -92.56. 600.00 0.31 0.26 0.04 81.97 123.15 -41.18 700.00 0..29 0.26 0.03 110.48 131.40 -20.92 800.00 0.28 0.26 0.03 146.78 140.59 6.19 900.00 0.28 0.22 0.06 129.81 124.68 5.13 1000.00 0.16 0.16 -0.00 37.01 88.16 -5.1.15 1100.00 0.26 0.16 0.11 262..91 118.65 144.27 1200.00 0.25 0.21 0.04 259.38 204.35 55.04. 1300.00 0.25 0.21 0.03 264.35 235.23 .29.12 1400.00 0.23 0.19 0.04 268.01 220.81 .47.21 1500.00 0.21 0.22 -0.01 259.49 183.95 75:53 1600.00 0.14 0.30 -0.16 310.05 128.47 -178.41 1700.00 0.36 0.34 0.02. 94.70 105.98 -11.28 1800.00 0.39 0.33 0.06 71.14 110.84 -39.71 1900.00 0.33 0.37 -0.04 55.69 '99.45 -43.76 2000.00 0.42 0.44 -0.02 37.11 74.34 -37.23 2100.00 0.46 0.48 -0.02 8.86 49.59 -40.73 2200.00 0.48 0.47 0.01 10.47 25.15 -14.69 2300.00 0.31 0.37 -0.06 62.48 38.98 23.50 2400.00 0.14 0.20 -0.06 94.90 85.32 9.58 2500.00 0.05 0.15 -0.10 112.63 92.67 19.96 2600.00 0.26 0.20 0.07 347.24 67.19 -79.95 2700.00 0.09 0.30 -0.21 263.41 96.25 167.16 280U.00 0.27 0.44 -0.17 16.90 170.92 -154.01 2900.00 3.16 2.85 0.32 1.66.70 195.41 -28.72 3000.00 7.18 7.13 0.06 168.72. 178.29 -9.57 3250.00 17.13 17.13 -0.00 177.94 178.21 -0.28 3275.00 17.38 17.38 -0.00 177.83 178.09 -0.26 3300.00 17.71 17.70 0.01 177.91 178.17 -0.25 3325.00 18.01 17.98 0.02 177.91 178.14 -0.23 3350.00 18.41 18.40 0.00 178.48 178.73 -0.25 3375.00 18.75 18.73 0.02 178.51 178.74 -0.23 3400.00 19.14 19.12 0.02 179.29 179.52 -0.23 3425.00 19.48 19.45 0.03 179.43 179.61 -0.18 3450.00 19.76 19.74 0.02 179.44 179.65 -0.20 3475.00 20.20 20.19 0.01. 180.17. 180.34 -0.17 3500.00 20.63 20.63 0.00 180.73 180.87 -0.14 3525.00 21.06 21.05 0.01 181.47 181.65 -0.18 3550.00 21.46 21.44 0.02 181.80 181.96 -0.15 3575.00 21.87 21.85 0.03 182.07 182.26 -0.18 3600.00 22.29 22.25 0.03 182.77 182.87 -0.10 3625.00 22.75 22.72 0.03 183.09 183.22 -0.13 3650.00 23.23 23.20 0.02 183.84 183.98 -0.14 3675.00 23.71 23.66 0.04- 184.13 184.26 -0.13 SURV-Q167 (OPS SUR-MA-003) 19"' Nov 03 /Rev 15 Page 2 of 9 AK0708G_142 Survey QC - RGS- ecification Sheet ~~/ 4625.00 47.87 47.85 0.02 190.72 190.68 0.04 4650.00 48.10 48.10 0.00 191.04 191.02 0.02 4675.00 48.89 48.90 -0.00 191.17 191.14 0.03 4700.00 49.46 49.46 -0.00 191.43 191.41 0.02 4725.00 50.38 50.38 -0.01 191.56 191.53 0.03 4750.00 51.00 50.99 0.01 191.80 191.77 0.03 4775.00 51.39 51.39 0.00 191.95 191.92 0.03 4800.00 52.26 52.26 -0.00 192.14 192.10 0.04 3700.00 .24.23. 24.20 0.03 184.35 .184.48 -0.14 3725.00 24.77 24.74 0.03 183.25 1$3.41 -0.16 3750.00 25.36 25.33 0.03 181.90 182.01 -0..11 3775.00 25.99. 25.95 0.04 181.21 181.28 -0.08 3800.00 26.61 26.57 0.04 181.15 181.22 -0.07 3825.00 27.22 27.20 0.01 181.28 1$1.36 -0.08 3850.00 27.76 27.73 0.02 181.72 181.81 -0.09 3875.00 28.30 28..28 0.03 182.18 182.23 -0.06 3900.00 28.77 28.74 0.03 182.85 182.94 -0.08 :3925.00 29.33 29.31 0.02 183.07 183.14 -0.07 3950.00 .29.93 29.87 ..0.06 183.17 183.26 -0.09 3975.00 30.40 30.36 0.04 183.74 183.79 -0.05 4000.00 31.01 30.97 0.04 184.21 184.25 -0.04 4025.00 31.68 31.63 0.05 184.55 184.62 -.0.06 4050.00 32.41 32.37 0.05 184.70 184J6 -0.06 4075.00 33.14 33.12 .0.02 184.80 184.87 -0.07 4100.00 33.88 33.83 0.05 184.89 184.94. -0.05 .4125.00 34.57 34.53 0.05 184.93 184.98 -0..05 4150.00 35.27 35.22 0.06 185.10 185.12 -0.02 4175.00 35.84 35.79 0.05 185.34 185.37 -0.03 4200.00 36.23 36.21 0.02 185.81 185.$1 -0.00 4225.00 36.91 36.88 0.03 185.92 185.93 -0'.p1 4250.00 37.60 37.58 0.02 186.09 186.13 -0.05 .4275.00 38.21 38.17 0.04 186.50 186.50 0.00 4300.00 38.92 -38.88 0.04 186.82 186.83 -0.01 4325.00 39.46 39.44 0.02 187.24 187.26 -0.02 4350.00 40.24 40.20 0.04 187.58 187.59 -0.01 4375.00 40:88 40.85 0.03 188.00 188.02 -0.02 4400.00 41.56 41.52 0.03 188.34 188.34 0.00 4425.00 42.36 42.33 0.03 188.63 188.62 0.01 4450.00 43.04 43.02 0.01 189.01 189.02 -0.01 447.5.00 43.84 43.80 0.04 189.19 189.18 0.01 4500.00 44.35 44.33 0.02 189.55 189.53 0.01 4525.00 45.16 45.14 0.01 189.73 189.71 0.02 4550.00 45.83 45.82 0.02 189.89 189.88 0.01 4575.00 46.23 46.22 0.01 190.22 190.22 -0.00 4600.00 47.10 47.08 0.01 190.47 190.45 0.02 SURV-Qi67 (OPS SUR-MA-003) 19v' Nov 03 /Rev 35 Page 3 of q AK0708G_342 Survey QC - RGS- ecification Sheet ~ 4825.00 ..4850.00 4875.00 4900.00 4925.00 4950.00 4975.00 5000.00 5025.00 5050.00 .5075.00 5100.00 5125.00 5150.00 5175.00 5200.00 5225.00 5250.00 5275.00 5300.00 .5325.00 5350.00 5375.00 5400.00 5425.00 5450.00 5475.00 5500.00 5525.00 5550.00 5575.00 5600.00 5625.00 5650.00 5675.00 5700.00 5725.00 .52.99 53.76 53.84 55.05 55.56 55.11 55.24 55.43 55.64 56.03 56.11 56.49 56.67 56.85 56.75 56.71 57.59 57.39 57.44 57.59 57.41 57.48 .53.02 53.76 53.87 55.05 55.56 55.11 55.25 -0.03 192.31 192.27 0.04 0.01 192.40 192.35 0.04 -0.03 192.47 192.43. 0.04 0.00 192.59 192.54 0.05 -0.00 192.55 192.49 0.05 0.00 192,76 192.72 0.04 -0.01 192.85 192.80 '0.04 -0.02 192.89 192.84 D.05 0.01 192.88 .192.82 0.05 -0.01 .192.98 .192.92 -0.06 -0.02 192.93 192.89 0.04 -0.02 193.16 193.09 0.06 -0.01 193.16 193.10 0.06 0.00 193.21 193.15 0.06 -0.02 193.36 .193.31. 0.05 -0.02 193.50 193.43 0.06 -0.02 193.37 193.32 _ 0.06 -0.01 193.44 193.39 0.05 -0.01 193.62 193.56 0.06 -0.01 193.81 193.76 0.05 -0.02 193..89 193.83 0.06 -0.01 193.81 193.76 0.05 -0.03 193.85 193.78 0.07 -0.01 193.82 193.76 0.07 -0.02 193.81 193.75 0.06 -0.02 194.00 193.94 0.07 -0.02 194.11 194.05 0.07 -0.02 194.41 194.35 0.06 -0.01 194.61 194.54 0.07 -0.02 194.58 194.51 0.07 -0.02 194.81 194.76 0.05 -0.02 194.98 194.89 0.09 -0.03 194.85 194.77 0.08 -0.01 194.81 194.73 0.08 -0.01 194.97 194.90 0.08 -0.02 195.18 195.11 0.07 -0.02 195.32 195.24 0.08 -0.02 195.37 195.30 0.07 -0.02 195.39 195.31 0.08 -0.02 195.32 195.24 0.08 -0.02 195.39 195.30 0.09 -0.03 195.39 195.31 0.08 -0.03 195.34 195.26 0.08 -0.03 195.26 195.18 0.08 -0.02 195.20 195.11 0.09 Page 4 of 9 AK0708G_i42 58.01 58.00 58.29 58.20 58.35 58.52 58.79 59.06 59.37 59.02 58.90 59.34 59.54 59.73 60.29 55.45 55.64 56.04 .56.13 56.51 56.68 56.85 56.77 56.73 57.61 57.40 57.45 57.60 57.43 57.50 58.04 58.01 58.31 58.21 58.37 58.54 58.80 59.08 59.39 59.05 58.93 59.35 59.55 59.74 60.30 5750.00 59.70 59.72 5775.00 60.07 60.09 5800.00 60.52 60.54 5825.00 60.35 60.37 5850.00 60.16 60.19 5875.00 60.06 60.10 5900.00 60.31 60.33 5925.00 60.20 60.23 SURV-Qi67 (OPS SUR-MA-003) 19°1 Nov 03 /Rev 15 Survey QC - RGS- ecification Sheet g 5950..00 60.11 ` 60.13 -0.02 195.20 195.12 0.08 5975.00 60.35. 60.38 -0.02 195.24 195.16 0.07 6000.00 59.97 59.99 -0.02 195.16 195.09 0.06 6025.00 59.56 59.58 -0.02 195.03 .194.96. 0.07 6050.00 59.59 59.61 -0.,02 195.11 :195.02 0.08 6075:00 59.93 59.95 -0.03 195.01 194:93 0.08 6100.00 60.43 60.46 -0.03 .195.10. 19.5.01. D.08 6125.00 59.67 59.68 -0.01 195.11 195.03. 0.07 6150.00 59.70 59.73 -0.02 195.15 195.08 ` 0.08 6175.00 60.09 60.12 -.0.03 195.14 .195.06 0.08 6200.00 .59.79 59.80 -0.01 195:20 195.12. 0.08 6225.00 59.57 59.61 -0.04 195.35 195.27 0.08 6250.00 60.45 60.47 -0.02 195.21 195.12 0.09 6275.00 60.49 60.51 -0.02 195.14 195.05 0.09 6300.00 60.25 60.28 -0.03 195:34 195.25 0.09 6325.00 60.23 60.26 -0.02 195.57 195.48 0.09 6350..00 60.62 60.64 -0.03 195.51 195.40 0.11 6375.00 60.92 60.94 -0.03 195.62 195.53 0.09 6400.00 61.30 61.34 -0.04 195.66 195.56 .0.10 6425.00 61.75 61.79 -0.04 195.55 195.45 0.10 6450.00 61.97 62.02 -0.05 195.62 195.51 .0.11 6475.00 62.22 62.25 -0.03 195.60 195.49 0.11 6500.00 62.42 62.45 -0.04 195.71 195.60 0.11 b525.00 62.15 62.19 -0.04 195.51 195.43 0.08 6550.00 63.39 63.44 -0.05 193.04 192.93 0.12 :6575.00 63.22 63.28 -0.06 191.27 191.16 0.11 6600.00 62.67 62.71 -0.04 188.59 188.45 0.14 6625.00 61.70 61.75 -0.05 186.54 186.40 0.14 6650.00 61.00 61.06 -0.06 185.62 185.50 D.11 6675.00 60.43 60.50 -0.07 184.73 184.61 0.12 6700.00 60.13. 60.20 -0.07 183.60 183.48 0.12 6725.00 59.91 59.99 -0.08 182.47 182.36 0.11 6750.00 59.40 59.48 -0.08 181.53 181.42 0.11 .6775.00 59.04 59.11 -0.07 180.81 180.69 0.12 .6800.00 58.85 58.93 -0.08 179.98 179.87 0.12 6825.00 58.43 58.50 -0.07 179.09 178.97 0.12 6850.00 57.95 58.03 -0.08 177.71 177.58 0.13. 6875.00 57.06 57.13 -0.08 174.95 174.82 0.12 6900.00 57.20 57.28 -0.08 172.59 172.45 0.15 6925.00 57.54 57.61 -0.08 171.95 171.80 0.15 6950.00 57.75 57.83 -0.08 .171.94 171.80 0.14 6975.00 58.07 58.17 -0.09 (72.38 172.25 0.13 7000.00 58.08 58.15 -0.08 173.17 173.04 0.13 7025.00 57.98 58.07 -0.09 .173.97 .173.82 .0.15 7050.00 57.89 57.97 -0.09 174.47 174.36 0.10 SURV~167 (OPS SUR-MA-003) 19°h Nov 03 / Rav 15 Page 5 of 9 AK0708G_142 Survey QC - RGS- ecification Sheet gy 7075.00 57.18 •57.34 7100..00 56.18 56..15 7125.00 54.96 55.00 7150.00 53.62 53.58 7175.00 52.39 52.48 7200.00 51.18 51.29 7225.00 49.84 .49.90 7250.00 48.39 48.51 7275.00 46.67 46.76 7300.00 45.40 45.47 7325..00 44.58 44.b9 7350.00 44.04 44.12 7375.00 42.47 42.53 7400.00 41.02 41.14 7425.00 39.54 39.59 7450.00 38.41 38.52 7475..00 36.91 36.95 7500.00 35.89 35.97 7525.00 34.67 34.77 7550.00 33.25 33.35 7575.00 31.76 31.84 7600.00 30.28 30.37 7625.00 28.82 28.92 7650.00 27.36 27.47 7675.00 26.12 26.20 7700.00 25.36 25.43 7725.00 24.80 24.87 7750.00 24.49 24.55 7775.00 24.35 24.40 7800.00 23.83 23.89 7825.00 23.39 23.46 7850.00 22.61 22.67 7875.00 21.80 21.88 7900.00 20.86 20.91 7925.00 20.30 20.35 7950.00 20.12 20.16 7975.00 20.18 20.19 8000.00 20.19 20.18 8025.00 20.26 20.27 8050.00 20.16 20.15 8075.00 20.32 20.29 8100.00 20.30 20.28 8125.00 20.20 20.19 8150.00 19.93 19.93 8175.00 19.92 19.90 SURV-Qi67 (OPS SUR-MA-003) 19m Nov 03 /Rev 15 -0.16 174.33. 174.28 0.05 0.04 173.76 173.61. 0.16 -0.03 174.08 173.86 0.22 0.05 174.53 174.36 0.17 -0.09 174.89 174.77 0.12 -0.11 175.45 175.28 D.17 -0.06. 177.12 176.99 0.13 -0.12 178.00 177.83 0.16 -0.09 17$.69 178.54 .0.15 -0.07 179.90 179.74 0.16 -0.11 181.05 1:80..84 0.21 0.07 182.68 182.57 0.11 -0.06 183.31 183.12 0.19 -0.12 183.92 183.71 0.20 -0.05 185.28 185.10 0.18 -0.11 186.27 186.06 0.20 -0.04 188.14 187.97 0.17 -0.08 189.46 189.28 0.18 -0.10 191.24 191,08 0.16 -0.09 193.06 192.87 0.18 -0.08 194.41 194.23 0.18 -0.09 195.84 195.63 0.21 -0.10 197.64 197.44 0.19 -0.10 199.62 199.42 0.20 -0.08 202.89 202.76 0.14 -0.07 205.09 204.89 0.20 -0.07 208.17 208.03 0.15 -0.06 210.40 210.26 0.14 -0.06 213.69 213.58 0.11 -0.06 216.84 216.63 0.20 -0.06 219.15 218.97 0.18 -0.06 222.18 222.08 0.10 -0.07 223.65 223.49 0.16 -0.05 225.84 225.65 0.19 -0.05 229.00 228.81 0.19 -0.03 231.27 231.11 0.16 -0.01 2.36.90 236.86 0.04 0.01 241.70 241.53 0.16 -0.01 246.34 246.32 0.02 0.01 250.71 250.68 0.03 0.02 255.27 255.29 -0.02 0.02 260.53 260.69 -O.lb 0.01 262.40 262.55 -0.15 -0.00 264.57 264.89 -0.32 0.02 263.70 263.73 -0.03 Page 6 of 9 AK0708G_142 Survey QC - RGS- ecification Sheet 8200.00 19.84 . 19.84 -0.00 .263.93 264.04 -0.10 8225.00 19.71 19.71 0.00.. 262..98 263.15. -0.17 5250.00 20.02 20.04 -0.01 263.15 263.21 -0.06 8275.00 19.25 19.27 -0.02 264.03 264.01 0.02 8300.00 19.25 19.25 -0.00 262.33 262.36 -0.03 8325.00 19.32 19.33 -0.02 .262.77 262.72 0.05 8350.00 19.66 19.68 -0.02 262.65 262..63 0.02 8375.00 20.27 20.28 -0.01 262.72 262.37 0.36 8400.00 20.62 20.63 -0.02 262.59 .262.29 0.30 8425.00 20.86 ` 20.86 -0.00 .262.65 262.28 0..37 8450.00 20.85 20.85 0.00 262,76 262.40 0.36 8475.00 21.18 21.19 -0.01 262.81 .262.48. 0.33 5500.00 21.13 21.17 -0.03 263.41 263.08 0.33 8525.00 20.86 20.84 0.01. 264.32 263.98 0.34 8550.00 21.59 21.58 0.00 263.82 263.52 0.30 8575.00 21.89 21.90 -0.01 263.81 263.49 0.32 8600.00 21.93 21.93 0.00 264.39 264.08 0.31 8625.00 21.89 21.92 -0.03 264.13 263.89 0.24 8650.00 21.18 21.19 -0.01 263.81 263.35 0.46 8675.00 20.71 20.70 0.01 264.87 264.44 0.43 8700.00 20.93 20.93 0.01 .264.52 264.13 0.38 8725.00 20.89 20.88 0.00 264.27 263.94 0.33 8750.00 21.63 21.62 0.01 264.42 264.15 0.26 8775.00 21.80 21.80 0.00 264.59 264.31 0.28 8800.00 21.74 21.75 -0.01 265.57 265.31 0.26 8825.00 21.93 21.89 0.03 264.51 264.15 0.36 8850.00 22.37 22.36 0.01 263.66 263.36 0.31 8875.00 22.78 22.80 -0.02 264.37 264.09 0.28 8900.00 21.92 21.94 -0.03 264.67 264.34 0.33 8925.00 21.88 21.90 -0.02 263.38 263.04 0.34 .8950.00 21.89 21.88 0.01 264.15 263.87 0.28 8975.00 21.90 21.90 0.01 264.44 264.18 0.26 9000.00 22.42 22.39 0.03 263.67 263.41 0.25 9025.00 23.11 23.03 0.08 263.73 263.52 0.22 9050.00 23.88 23.88 0.00 263.22 263.00 0.22 9075.00 24.41 24.38 0.03 263.39 263.18 0.21 9100.00 24.90 24.87 0.03 263.49 263.32. 0.18 9125.00 25.82 25.75 0.07 263.06 262.88 0.17 9150.00 26.68 26.63 0.05 263.03 262.86 0.17 9175.00 27.55 27.51 0.04 262.98 262.84 0.14 9200.00 28.23 28.18 0.05 262.86 262.67 0.19 9225.00 29.12 29.09 0.03 263.13 262.95 0.18 9250.00 30.09 30.01 0.08 263.41 263.27 0.14 9275.00 31.11 31.00 0.11 263.56 263.41 :0.15 9300.00 32.59 32.50 0.09 263.58 263.46 0.12 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 35 Page 7 of 9 AK0708G_142 Survey QC - RGS- pecification Sheet 9325.00 33.95 33..88. 0.07 263.77. 263.66 0.11 9350.00 35.36. . 35.33. 0.03.. 263.84 :263.72. 0.12 9375.00 36.34 36.27 0.06 264.11 263.97 0.13 9400.00 37.36 37.30 0.06 264.56 264.44 0.11 9425.00 38.86 38.79 0.07 264.70 264.62 0.09 9450.00 40.22 40.15 0.07 264.52 264.45 0.07 9475.00 41.55 41.50 0.06 263.76 263.70 0.06 9500.00 43.08 43.01 0.07 263.22 263.15 0.07 9525.00 44.87 44.79 0..08 263.24 263.20 0.04 9550.00 47.18 47.07 0.11 263.29 263.26 0.03 .9575.00 49.00 48.96 0.04 ` :263.58 263.56 Q.01 9600.00 51.22 51.17 0.05 264.32 264.31 0.01 9625.00 52.43 52.38 0.05 264.52 264.51 0.01 9650.00 53.10 53.04 0.06 .264.74 .264..71 0.03 9675.00 53:37 53.33 0.05 264.66 264.64 0.03 9700.00 53.85 53.80 0.05 264.59 264.56 0.03 9725.00 54.43 54.39 0.04 264.86 264.84 0.02 9750.00 54.16 54.11 0.06 264.52 264.43 0.09 9775.00 54.65 54.58 0.07 264.51 264.47 0.04 9$00.00 56.11 56.06 0.05 264.29 264.26 0.03 9825.00 56.97 56.94 0.04 264.07 264.04 0.03 9850.00 57.16 57.13 0.03 264.08 264.05 0.03 9875.00 56.95 56.98 -0.03 264.25 264.31 -0.06 9900.00 56.95 56.85 0.10 263..83 263.62 0.20 ...9925.00 57.14 57.06 0.08 264.00 264.02 -0,02 9950.00 56.24 56.16 0.08 264.37 264.31 0.06 9975.00 56.49 56.45 0.04 264.16 264.13 0.04 10000.00 56.75 56.73 0.02 263.89 263.88 0.01 .10025.00 55.85 55.80 0.05. 264.77 264.73 0.04 10050.00 55.75 55.71 0.03 264.18 264.13 0.05 10075.00 56.07 56.03 0.04 264.21 264.14 0.07 10100.00 55.83 55.78 0.05 264.45 264.41 0.04 10125.00 55.89 55.87 0.02 264.55 264.45 0.10 10150.00 56.20 56.18 0.01 264.63 264.59 0.05 10175.00 56.96 56.95 0.01 264.57 264.52 0.05 10200.00 57.57 57.54 0.03 264.56 264.52 0.04 10225.00 57.25 57.23 0.03 265.03 265.01 0.02 10250.00 57.27 57.24 0.03 265.11 265.00 0.11 10275.00 57.46 57.53 -0.07 264.96 264.90 0.06 10300.00 56.91 56.79 0.12 265.64 265.64 0.01 10325.00 57.13 57.11 0.02 265.51 265.45 0.06 10350.00 57.06 57.05 0.01 264.70 264.61 0.08 10375.00 57.17 57.15 0.02 263.98 263.92 0.06 10400.00 57.05 57.03 0.02 264.36 264.33 0.03 10425.00 57.01 56.97 0.04 264.22 264.11 0.11 SURV-Q367 (OPS SUR-MA-003) 19"' Nov 03 /Rev 15 Page 8 of 4 AK0708G_342 ~ i Survey QC - RGS- ecificatioln Sheet ~i~' 10450.00 56.96 56.92 0.04 263.30 263.17 0.13 10475.00 56.62 56.57 0.05 262.08 261.94 0.14 10500.00 56.74 56.75 -0.01 261.42 261.39 0.03 :10525.00 56.78 56.75 0.02 262.40 262.36 0.04 10550.00 56.26 56.27 -0.01 261.59 261.45 0.13 10575.00 56.78 56.78 0.01 262.20 262.21 -0.01 10600.00 55.77 55.73 0.04 262.16 .261.99 0.17 10625.00 56.33 56.32 0.01 262.04 261.98 0.06 10650.00 55.94 55.87 0.06 261.14 260.99 0.15 10675.00 55.87 55.92 -0.05 260.58 260.51 0.07 10700.00 55.46 55.39 0.07 261.43 261.36 0.07 10725.00 55.72 55.71 0.02 261.30 261.1b 0.14 10750.00 54.88 54.82 0.06 260.76 260.68 0.08 10775.00 54.88 54.86 0.01 261.60 261.50 0.10 10800.00 54.57 54.55 0.02 261.04 260.91 0.14 10825.00 54.70 54.73 -0.03 261.69 261.81 -0.12 10850.00 55.52 55.54 -0.02 262.53. 262.59 -0.06 1087.5.00 55.50 55.50 0.00 263.04 263.06 -0.03 10900.00 55.12 55.10 0.02 263.13 263.14 -0.01 10925.00 55.72 55.74 -0.02 263.83 263.86 -0.03 10950.00 56.61 56.62 -0.01 264.64 264.67 -0.03 .:10975.00 57.10 57.09 0.01 265.01 265.05 -0.03 11000.00 57.39 57.35 0.03 265.83 265.83 0.00 11025.00 56.69 56.67 0.01 265.14 265.10 0.04 110.50.00 56.77 56.73 0.05 265.66 265.66 0.00 11075.00 56.84 56.82 0.03 265.17 265.12 0.05 11.100.00 58.96 58.89 0.07 265.32 265.28 0.04 11125.00 63.59 63.70 -0.11 266.22 266.26 -0.04 Average -0.0011 0.0701 Standard Deviation 0.0551 0.1234 Tolerance for both the Average and the Standard Deviation Casing 0.3~ Drill i e 0.3~ Casing 0.5~ Drill i e 0.75 '~ 1nCimatlOn ana AZrmULn Interporaieo w same aepms as snvwn. SURV-Q167 (OPS SUR-MA-003) 19tl' Nov 03 /Rev 15 Rape 9 of 9 AK0708G_342 • • WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs : 06-06B+PB 1 -:,T, January 31, 2008 AK-MW-3795164 06-06B+PB 1: Digital Log Images: ~ .~ ~~(;~ 1 CD Rom so-o29-20201-02,7o w ~ ~~~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 t. , z _ __ r ~ ~~-~ Date: -- ~ ~- ~4 5 -p9 ~ ~ 1590 ~ BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 f, Signed:~y , ~~ _ ~3l ~ ~s9o~ • WELL LOG TRANSMITTAL To: State of Alaska January 22, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: 6-06B AK-MW-3795164 1 LDWG formatted CD rom with verification listing. API#: 50-029-20201-02 ~~R~~ FEB ~ ~. 20~1~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage, Alaska 99518 Anchorage, Alaska 99508 ~y ~ ~ ~" h ~ ;, ~ :1;,f,., ,~; ~ Date: ~~ ~ ~~ ~ Signed: • • WELL LOG TRANSMITTAL To: State of Alaska January 22, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: 6-06B PB1 AK-MW-3795164 1 LDWG formatted CD rom with verification listing. API#: SO-029-20201-70 ~~~1~~~~ FEB ~ ~. [DC~ PLEASE ACKNOWLEDGE RECEII'T BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage,,; Alask 9 8 ~`~~ ~ ,1 ~ Date: ~ a ;~ BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: SOS -CY~'~ ¢l'S~`tsS~ • • WELL LOG TRANSMITTAL To: State of Alaska January 11, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs : 14-21A AK-MW-3882536 14-21A: Digital Log Images: ~~~~~ ~~~ ' ~ ~~~~ 1 CD Rom 50-029-20756-0 l PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska} Inc. Attn: Rob Kalish Petrotechnical Data Center, MB33 6900 Arctic Blvd. 900 E. Benson Blvd. her~ge,~Alasltia:~9518 Anchorage, Alaska 99508 -- .~~ .. ,a ,,'f ~ j~.J I.~~J Dater - Signed: p t~~-C ~~-/off- # r5~5Sa as ~-~. DATA SUBMITTAL COMPLIANCE REPORT 7119/2007 Permit to Drill 2050980 Well Name/No. PRUDHOE BAY UNIT 06-066 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20201-02-00 MD 13059 TVD 8696 Completion Date 7/25/2005 Completion Status 10-WI Current Status 1-OIL UIC. N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes •~ DATA INFORMATION Types Electric or Other Logs Run: MWD DIR /RES, MWD DIR / GR RES /DEN / NEU, DIR / GR /RES / (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ~ ED D Asc Directional Survey 11079 13059 Open 9/7/2005 IIFR E D Asc ~ Directional Survey 11079 13059 Open 9/7/2005 MWD D Asc ~ Directional Survey 6505 11581 Open 9/7/2005 IIFR PB1 '~a~i D Asc Directional Survey 6505 11581 Open 9/7/2005 MWD PB1 Well Cores/Samples Information: Name Sample Interval Set Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y / N Daily History Received? / Chips Received? Y / N Formation Tops / N Analysis Y / N Received? Comments: ~~ Ir ~{z~ ~~S t Compliance Reviewed By: Date: Date 09-14-2007 Transmittal Number:92903 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) [f you have any questions, please contact Douglas Dortch at the Yll(; at 564-4y /3 u~C Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 06-06B ~ y6 yab 06-06BPB1 ~ 905 ~~ ~ ~ yam 14-11 A `~ ~~ lg6 ~ ~a 14-11AP61 14-21A uzcao5 -~v~ ~ +5 ~~3~ 15-39A aolo-o~'Fl ~ tQ~/3a 16-06Baac.-Otit '+ ~s~3 16-14Bc~o(e•~3 "~SS/3y c-o36 aos ~s~r ~ ~s~s C-10A aos =t3~ • a5~las: NGI-07A uzeacX.-,ate ~ t5~lc3~l r Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ~- 3 ~~~ ~ ~ .~ _ .~ ~- ~ ~ 7 ~ Vii' !r. -- a,~Fs ibC~~~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99~ 19-6612 • • 10-Aug-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re; Distribution of Survey Data for Well 6-06B Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 11,079.90' MD Window /Kickoff Survey: 11,095.00' MD (if applicable) Projected Survey: 13,059.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date ~ ~~~ Si ned ~~~~~~ 7 ~ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) -~~~' :h ~ )N ~`~` ~.. • 10-Aug-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 6-06B MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 11,079.90' MD Window /Kickoff Survey: 11,095.00' MD (if applicable) Projected Survey: 13,059.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ..~f~ ~/, ~ ~'~ Date ~ - ~'v ~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) -r~ v~ - ~ ~~' ~1~. • • 10-Aug-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well 6-06B PB1 Dear Dear Sir/Madam: Enclosed is one disk with the `.PTT and *.PDF files. Tie-on Survey: 6,505.80' MD Window /Kickoff Survey: 6,548.00' MD (if applicable) Projected Survey: 11,581.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 _~ ~, ~ n , Date ~ ``__~~i - Signed ~` `~ L%~~ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ,-.. ~~ ~~-L'~ ~ ~i • • 10-Aug-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 6-06B PB1MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and ~`.PDF files. Tie-on Survey 6,505.80' MD Window /Kickoff Survey: 6,548.00' MD (if applicable) Projected Survey: 11,581.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 , Date~L~ Signed ~ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) STATE OF ALASKA ALASKA~L AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 20AAC 25.105 20AAC 25.110 ^ GINJ ^ WINJ ^ WDSPL No. of Com letions One p Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 7/21/2005 12. Permit to Drill Number .205=Q98' 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/30/2005 13. API Number 50-029-20201-02-00 4a. Location of Well (Governmental Section): Surface: 138' FSL 1065' FEL S 7. Date T.D. Reached 7/18/2005 14. Well Name and Number: PBU 06-06B , , EC. 02, T10N, R14E, UM Top of Productive Horizon: 3302' FNL, 3539' FEL, SEC. 11, T10N, R14E, UM g• KB Elevation (ft): 65.8' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Total Depth: 2881' FNL, 56' FEL, SEC. 10, T10N, R14E, UM 9. Plug Back Depth (MD+TVD) 13059 + 8696 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 685928 y- 5940735 Zone- ASP4 10. Total Depth (MD+TVD) 13059 + 8696 Ft 16. Property Designation: ADL 028311 _ TPI: x- 683543 y- 5937236 Zone- ASP4 Total Depth: x- 681736 Y- 5937613 Zone- ASP4 11. Depth where SSSV set (Nipple) 2216' MD 17. Land Use Permit: 18. Directional Surve Y ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD DIR / GR /RES, MWDDIR / GR RES /DEN / NEU, DIR / GR /RES /DEN 22. ASING, LINER AND EMENTING ECORD CASING ETTING EPTH MD : ETTMG EPTH TVD La©LE AMOUNT SIZE WT. PER FT. GRADE OP QTTOM OP OTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 80' Surface 80' 32" 300 sx Permafrost II A rox. 13-3/8" 72# MN-80 Surface 2719' Surface 2719' 17-1/2" 985 sx Arcticset 9-5/8" 47# MN-80 / S-95 Surface 6548' Surface 5434' 12-1/4" 1000 sx'G', 180 sx CS I, 105 sx AS 7" 26# L-80 26' 11085' 26' 8683' 8-1 /2" 1 s sx, 1sa sx, zsz sx, 14o sx, All Class'G' 4-1/2" 12.6# L-80 10935' 13057' 8602' 8696' 6-1/8" Uncemented Slotted Liner 23. Perforations open to Produc B tt I t Si tion (MD +TV D of Top and " " 24. TUBING RECORD o om n erval, ze and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Sections 4-1/2", 12.6#, 13Cr80 10953' 10897' MD TVD MD TVD 11091' - 11134' 8687 - 8707 11158' - 13034' 8716' - 8697' 25. ACID, FRACTURE, :CEMENT .SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED Freeze Protect with 75 Bbls of Diesel 26. PRODUCTION TEST Date First Production: August 10, 2005 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date of Test 8/22/2005 Hours Tested 1.6 PRODUCTION FOR TEST PERIOD OIL-BBL 148 GAS-MGF 582 WATER-BBL -0- CHOKE SIZE 41.9 GAS-OIL RATIO 3,934 Flow Tubing Press. 63 Casing Pressure 1,400 CALCULATED 24-HOUR RATE OIL-BBL 2,222 Gas-McF 8,736 WATER-BBL -0- OIL GRAVITY-API (coRR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". ~ ~G'~r'~41~1i}~r>.` ~~ rs ~/tJl`L.~a.a~ CJ J ~O ~,Q. ~~ !~ ~ ~~ ~~~ None 0 / A~~ ~ Q 203 ., . - .. Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE .. r~ 28. GEOLOGIC MARKERS 29. FORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 11094' 8688' None Shublik A 11149' 8713' Shublik B 11244' 8735' Shublik B 11320' 8734' Shublik A 11459' 8711' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. j~ Signed `~ ~ ~ ~ Title Technical Assistant Date V 2.~ (~ Terrie Hubble PBU 06-06B 205-098 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Ken Allen, 564-4366 INSTRUCTIONS GeNeRAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: True vertical thickness. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: If no cores taken, indicate "None". ITeM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Printed: 7/25/2005 8:04:19 AM BP EXPLORATION Operations Summary Report Page 1 of 10 Legal Well Common W Event Nam Contractor Rig Name: Date - Name: 0 ell Name: 0 e: Name: From - To ~~ - 6-06 6-06 REENTE NABOB NABOBS Hours i ~ R+COM S ALASK 2ES Task ~, PLET A DRI Code i E LLING NPT Start I Rig Rig Phase Spud Date: 2/21/1976 : 6/26/2005 End: 7/18/2005 Release: 7/21/2005 Number: Description of Operations 6/25/2005 17:00 - 20:00 3.00 DEMOB P - DECOMP _ _ __ _- - Rig down floor. Bridle up derrick. Lower cattle chute. Lower Derrick. Move pits and sub base off well & stage on pad. 20:00 - 00:00 4.00 DEMOB P DECOMP Standy by -Wait on DS 06-06B wellsite preparation -Removal of wing valve and level pad. Clean location DS 6 - 20A. 6/26/2005 00:00 - 02:00 2.00 DEMOB P DECOMP Set malts. Spot and level sub over DS 06-06B. Raise derrick. Set malts for pits. 02:00 - 04:00 2.00 DEMOB P DECOMP Spot pits. Hook up lines. Set & berm cutting pit. Set shop, camp, and buildings. Hook up intercoms. Rig accepted ~ 0400 hrs. 04:00 - 05:00 1.00 DEMOB P DECOMP Bridle down. Pin blocks. Hang Bridle line. 05:00 - 06:30 1.50 WHSUR P DECOMP RU DSM lubricator. Pull BPV. Take on water. RD DSM lubricator. RU floor.. Clean floor. 06:30 - 08:30 2.00 DEMOB P DECOMP Install double valve on annulus. RU lines to circ well. 08:30 - 09:00 0.50 DEMOB P DECOMP Hold pre spud meeting with all personel. 09:00 - 11:30 2.50 KILL P DECOMP Test lines to 1000 psi. Circ well w/ clean 8.4 ppg SW - pumped 513 bbls C~3 6 bpm - 500 psi. 11:30 - 12:00 0.50 KILL P DECOMP Monitor well. RD circ lines and clear cellar. 12:00 - 13:00 1.00 WHSUR P DECOMP Set BPV. Test from below to 1,000 psi. 13:00 - 15:00 2.00 WHSUR P DECOMP ND tree and adaptor flange. 15:00 - 17:00 2.00 WHSUR P DECOMP NU BOPE. 17:00 - 17:30 0.50 WHSUR P DECOMP RU to test BOP's. 17:30 - 23:00 5.50 WHSUR P DECOMP Test BOPE as per BP policy to 250 psi low and 3500 psi high for 5 min /test. Unable to test lower pipe rams. Test witness waived by Jeff Jones w/ AOGCC. Test witnessed by James Henson -Pusher, Mike Whiteley -Drilling supv. 23:00 - 23:30 0.50 WHSUR P DECOMP RD test joint. 23:30 - 00:00 0.50 PULL P DECOMP Pull Blank plug. RU DSM lubricator to pull BPV. 6/27/2005 00:00 - 01:00 1.00 PULL P DECOMP RU DSM lubricator. Pulled TWCV. RD DSM. 01:00 - 03:00 2.00 PULL P DECOMP MU landing joint in tubing hanger. Back out LDS. Pulled tbg hanger to rig floor -String wt 105K. Monitor well. Disconnect control lines. RU spooling unit. RU handling tools. LD hanger and landing JT. 03:00 - 04:00 1.00 PULL P DECOMP LD 5.5" pups, and XO. Change handling tools to 4.5".. 04:00 - 09:30 6.00 PULL P DECOMP POOH LD 4 1/2" tubing to SSSV -spool up control lines. LD SSSV. RD spooling unit. REC 31 SS bands. Continue POOH laying down 4.5" tubing. 10:00 - 10:30 0.50 PULL P DECOMP Service top drive, lub rig, adj brakes. 10:30 - 11:00 0.50 PULL P DECOMP LD 4.5" tbg. RD tubing handling tools -clear and clean rig floor. Rec 162 jts 4.5" tbg + piece, 3- GLM', 1 -SSSV. 11:00 - 12:30 1.50 DHB P DECOMP RU SWS. 12:30 - 13:00 0.50 DHB P DECOMP RIHw/ 8.48" GR / JB /CCL to 600'. Trouble w/ CCL. POOH with wire line tools. 13:00 - 14:30 1.50 DHB N DECOMP Trouble shoot CCL. 14:30 - 16:30 2.00 DHB P DECOMP RIH with GR ! JB / CCL to 4 1!2" stump ~ 6800'. Ran CCL. Rec 4 gal parfin and scale. 16:30 - 20:00 3.50 DHB P DECOMP MU 9 5/8" EZSV. RIH and set plug ~ 6537'. POOH w/ setting tool. RD SWS. 20:00 - 22:30 2.50 DHB P DECOMP MU mule shoe sub. PU 21 jts 5" HWDP, 9 5/8" storm packer. Set packer 5' below well head. Test csg / packer to 3,500 psi. Held. 22:30 - 23:30 1.00 BOPSU P DECOMP ND BOP stack. 23:30 - 00:00 0.50 WHSUR P DECOMP RU to pull 9 5/8" pack-off bushing. Unable to rotate to left. 6/28/2005 00:00 - 00:30 0.50 WHSUR P DECOMP Attempt to pull 9 5/8" pack-off. Pulled 50K. Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Operations Summary Report Page 2 of 10 Legal Well Name: 06-06 Common Well Name: 06-06 Spud Date: 2/21/1976 Event Name: REENTER+COMPLETE Start: 6/26/2005 End: 7/18/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/21/2005 Rig Name: NABOBS 2ES Rig Number: Date From - To ~~~ ~i Task ~ Code NPT ~, Phase Description of Operations Hours ~- -- - _ - - -- --_ -- 6/28/2005 ~ 00:30 - 01:00 0.50 WHSUR P ~ ~ DECOMP ND tubing head. Pulled tubing head w/ pack-off. Pulled 40k. 01:00 - 03:30 2.50 WHSUR P 05:00 - 07:30 2.50 BOPSU~P 07:30 - 08:00 0.50 BOPSU P 08:00 - 09:00 1.00 DHB P 09:00 - 10:00 1.00 DHB P 10:00 - 11:30 1.50 WHSUR P 11:30 - 12:30 1.00 WHSUR P 12:30 - 13:00 0.50 CASE P 13:00 - 15:30 2.50 CLEAN P 15:30- 17:00 1.50 CLEAN P 17:00 - 17:30 0.50 CLEAN P 17:30 - 18:00 0.50 CLEAN P 18:00 - 19:00 1.00 CLEAN P 19:00 - 22:30 3.50 CLEAN P 22:30 - 00:00 I 1.501 CLEAN 1 P 6/29/2005 00:00 - 03:00 3.00 CLEAN P 03:00 -04:00 1.00 CLEAN P 04:00 - 06:30 2.50 STWHIP P 06:30 - 08:30 2.00 STWHIP P 08:30 - 11:30 3.00 STWHIP P 11:30 - 12:00 0.50 STWHIP P 12:00 - 12:30 0.50 STWHIP P 12:30 - 13:00 0.50 STWHIP P 13:00 - 19:00 6.00 STWHIP P 19:00 - 20:00 1.00 STWHIP P 20:00 - 20:30 I 0.501 STWHIPI P 20:30 - 21:00 0.50 STWHIP P 21:00 - 00:00 3.00 STWHIP P 6/30/2005 00:00 - 02:30 2.50 STWHIP P 02:30 - 03:00 0.50 STWHIP~P 03:00 - 03:30 0.50 BOPSU P 03:30 - 07:30 4.00 DRILL P DECOMP Installed new 9 518" pack-off and csg head. Test to 4,000 psi.for 10 min. Held. DECOMP NU BOP's. DECOMP RU to test BOPE. Test BOPE as per BP policy to 250 psi low and 3,500 psi high.Tested pipe rams, Hydril w/ 5" DP. Test witness waived by Jeff Jones w/ AOGCC. Witnessed by mike Whiteley - Drlg Supv, Jim Henson - toolpusher. DECOMP Rig down test equipment. Set wearbushing. DECOMP MU HES running tool. Retrieved storm packer. LD same. DECOMP POOH w/ 21 jts 5" HWDP. DECOMP Attempt to test 9 5/8" csg to 3,500 psi. Not holding. DECOMP Re-test 9 5/8" pack-off. Torque LDS to 600 fUlbs. Test pack-off to 4,000 psi held. DECOMP Test 9 5/8" csg to 3,500 psi for 30 min. Lost 400 psi. DECOMP MU Clean out BHA. 8.5" bit, 8.5" string mill, B.S., Jars, 9 DC's, HWDP DECOMP PU 5" DP to 2517. DECOMP Fill pipe and CBU C~3 251T. 12 BPM C~3 850 psi. DECOMP Lubricate rig. Service top drive. DECOMP Cut drilling line and adjust brakes. DECOMP RIH picking up 5" DP to 6486'. Install blower hose. Tag 9 5/8" EZSV C~ 6,571'. Set 30k on EZSV. Up 160K DN 130k. DECOMP Pump hi vis sweep. Diplace well with 9.0 ppg LSND milling mud. Recipcate & Rotate. 12 bpm ~ 800 psi. UP 155K, DN 135K, RT 145K, TO 3-4 K. DECOMP POOH w/ bit to BHA. DECOMP Pulled BHA. LD bit, mill ,bumper sub., and jars. WEXIT PJSM. M.U. Milling BHA / Whipstock. Orient. Uplaoad tools. WEXIT RIH w/ Whipstock to 1136'. Shallow test MWD tools. 450 gpm ~ 600 psi. WEXIT RIH w/ Whipstock to 6529'. WEXIT Install blower hose. Service rig & TD. WEXIT Orient whipstock to 85 LHS C~1 6529'. Tag EZSV C~3 6571'. Set down 30k to set Bottom trip anchor. PU 10K. Set down 50K 5X to shear off. UP 155k DN 135K RT 145K TO 3-4K ~ 85 RPM. Tip of whipstock C~ 6548'. WEXIT SPR's. CBU to shear mud. WEXIT Mill window in 9 518"f/ 6548'- 6564'. New hole to 6576'. WEXIT Pump high vis super sweep around C~ 6576' and polish window 490 gpm C~ 1100 psi..Circ clean. Rec 180 Ibs metal cuttings. Work mills thru window. WEXIT Pulled up into 9 5/8" csg. Performed FIT w/ 9.0 ppg to EMW 11.1 ppg. Pumped in C~3 600 psi. TVD 5432'. Notified BP Drilling eng. and AOGCC Inspector -Chuck Scheve of low FIT pressure. WEXIT Monitor well. Slug DP. Remove blower hose. WEXIT POOH w! window mills. Stand back HWDP. WEXIT PJSM. L.D D.C.'s. Down load LWD's. Finish L.D. BHA. Upper window mill full gage - 8.5". WEXIT Clear rig floor. PJSM. WEXIT Flush out BOPE, flow line, shakers. Function Rams. WEXIT P.U. Drilling BHA. Set motor to 1.5 deg. Orient tools. Initalize Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Page 3 of 10 Operations .Summary Report Legal Well Name: 06-06 Common Well Name: 06-06 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 2ES Date ~ From - To ~ Hours ~~ Task Code I NPT ~~ ~_ 6/30/2005 03:30 - 07:30 4.00 DRILL P 07:30 - 11:00 3.50 DRILL P 11:00 - 11:30 0.50 DRILL P 11:30 - 12:00 0.50 DRILL P 12:00 - 12:30 0.50 DRILL P 12:30 - 13:00 0.50 DRILL P 13:00 - 13:30 0.50 DRILL P 13:30 - 14:00 0.50 DRILL P 14:00 - 14:30 0.50 DRILL P 14:30 - 16:00 1.501 DRILL ~ N DPRB 16:00 - 18:00 I 2.001 DRILL I N I DPRB I 18:00 - 18:30 I 0:501 DRILL I N I DPRB I 18:30 - 19:00 0.501 DRILL P 19:00 - 00:00 I 5.001 DRILL I P 7/1/2005 100:00 - 00:00 24.00 DRILL P 7/2/2005 100:00 - 00:00 24.00 (DRILL P 71312005 00:00 - 12:30 ~ 12.50 ~ DRILL ~ P 12:30 - 14:00 I 1.501 DRILL f P 14:00 - 16:00 2.00 DRILL P 16:00 - 18:00 2.00 DRILL P 18:00 - 19:00 1.00 DRILL P 19:00 - 20:00 1.00 DRILL P 20:00 - 22:00 2.00 DRILL P 22:00 - 00:00 I 2.001 DRILL I P 7/4/2005 100:00 - 01:30 I 1.501 DRILL I P 01:30 - 00:00 I 22.501 DRILL I P Spud Date: 2/21/i976 Start: 6/26/2005 End: 7/18/2005 I Rig Release: 7/21/2005 Rig Number: Phase Description of Operations WEXIT LWD's. Finish M.U. BHA. Shallow test MWD. WEXIT RIH P.U. 5" DP to 5,622'. WEXIT RIH w/ pipe from derrick to 6,474'. WEXIT Service top drive -lubricate rig. WEXIT Orient 85 LHS Ca? 6474'. SPR. UP 155k DN 135K. WEXIT RIH to 6,569'. No problem going thru window f/ 6548' - 6564'. Ream to btm ~ 6576'. INT1 Drill f/ 6576' - 6605'. INT1 CBU C~3 6605'. 425 gpm @ 1100 psi. INTi Pull up into csg. Perform FIT w/ 9.1 ppg to 10.9 EMW - 500 psi. TVD 5432'. INTi RIH to bottom @ 6,605'. Spot 30 bbls 45 #/ bbl LCM pill as per BP Anchorage office. Clear DP .POOH above pill to 6,153'. INTi Squeeze LCM pill C~3 6153'. Pumped 9 bbls. Stage squeeze pressure up from 500 psi to 850 psi' waiting 5 min each time to allow pressure to stabilise. Got final pressure of 775 psi that stabilised in 10 minutes. INTi Perform FIT w/ 9.1 ppg mud. EMW = 11.84 ppg.- 775 psi: TVD 5,432'. INT1 RIH to 6,548'. Orient. Run to bottom C~3 6,605'. No problem going thru window. INTi Dir. Drlg f/ 6,605' to 6,820'. AST 2.09 ART 1.05. UP 155K DN 130K RT 145K TO off 5K TO on 6K .ECD 9.99 . OFF 1350 psi, On 1450 Psi. 500 gpm. INT1 Drill from 6,820' - 7,894 '. UP 180K DN 150K RT 155K, 550 gpm OFF 1530 psi , ON 1,700 psi , TO OFF 5 -6K, TO ON 6 - 7K, RT 70 rpm. ECD 9.9 ppg. Difficult sliding -nut plug sweeps /added lubricant. Sliding still difficult. INTi Dir Drill from 7,894' - 8,925'. AST 8.54 hrs, ART 9.42 hrs. UP 200K DW 165K RT 180K, TO ON 9-10K TO OFF 7-8K, 545 gpm 1700 psi. ROT 80 rpm. ECD = 10.2 ppg. Sliding improved below -8000' once in to the CM3 formation. INT1 Dir Drill from 8,925' - 9,423'. ART 2.6hr AST 5.56hr. UP 230K, DN 165K, RT 194K, TO ON 11-12K, TO OFF 9-10K. 545 GPM C~ 1800 psi. Difficulty sliding. INT1 Circ for wiper trip to window. POOH to 9,405'. Pump hi-vis sweep around to shoe C~ 6,548'. POOH to 9,310'. Pump sweep around. ROT & REC pipe C~? 80 RPM, 545 gpm C~3 1800 psi.Circ hole clean. INT1 POOH to 6,615' for Mad pass log - no problems. INT1 MAD pass log 250 W hr f/ 6,615' - 6,180' per geologist. INTi Cut and slip drilling line. INTi Service topdrive / drawworks /automatic driller. INTi RIH to 6,474'. Orient tool face 85 L. Run thur window f/ 6,548' - 6,564' - no problems. RIH to 9,405. No problems. INTi Pump sweep. Start raising mud wt from 9.3 ppg to 11.3 ppg w/ 16.0 ppg pre-mixed mud. 497 gpm @ 1720 psi. Adjust pump rate for trucks offloading. Rotate and Recip pipe. INT1 Circ and raise mud wt. to 11.3 ppg w/ pre-mixed 16.0 ppg mud - pump 210 gpm -rot. & rec pipe. INT1 Dril{ from 9,423' - 10,369'. AST 10.43 hrs, ART 5.15 hrs. UP 230k, DW 160K, RT 185K. TO ON 10 -13K, TO OFF 9 - 10 K. 496 gpm @ ON 2550 psi, OFF 2,275 psi. ECD = 12.41 ppg. No Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Operations Summary Report Page 4 of 10 Legal Well Name: 06-06 Common Well Name: 06-06 Spud Date: 2/21/1976 Event Name: REENTER+COMPLETE Start: 6!26/2005 End: 7118!2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/21/2005 Rig Name: NABOBS 2ES Rig Number: Date ,From - To Hours Task Code NPT ! Phase Description of Operations 7/4/2005 01:30 - 00:00 22.50 DRILL P INT1 problems. 7/5/2005 00:00 - 14:00 14.00 DRILL P INT1 Directional Drill from 10369' - 11050'. UP 245K DN 155K RT 14:00 - 15:00 1.00 DRILL P 15:00 - 16:00 1.00 DRILL P 16:00 - 17:30 1.50 DRILL P 17:30 - 19:30 2.00 DRILL P 19:30 - 21:30 2.00 DRILL P 21:30 - 23:00 1.50 DRILL P 23:00 - 00:00 1.00 DRILL P 7/6/2005 00:00 - 01:30 1.50 DRILL P 01:30 - 06:00 I 4.501 DRILL I P 09:30 - 09:00 3.50 BOPSUR P 11:00 - 12:30 ~ 1.50 ~ BOPSUFj P 12:30 - 13:00 0.50 CASE P 13:00 - 22:00 9.00 CASE P 22:00 - 22:30 I 0.501 CASE I P 22:30 - 23:30 1.00 CASE P 23:30 - 00:00 0.50 CASE P 7!712005 00:00 - 01:00 1.00 CASE P 01:00 - 04:00 3.00 CASE P 04:00 - 04:30 0.50 CASE P 04:30 - 05:30 1.00 CASE P 05:30 - 05:45 0.25 CASE P 05:45 - 06:30 0.75 CASE P 06:30 - 06:45 0.25 CEMT P 06:45 - 07:00 I 0.251 CEMT I P 07:00 - 08:00 1.00 CEMT P 190K, 495 gpm C~ 2,420 psi OFF, 2,720 psi ON Btm. TO off 13-14K, TO ON 12-16K. ECD = 12.54 ppg. No mud losses. AST = 1.98, ART = 7.34. INT1 Circ cuttings sample up for geologist. INT1 Dir drill from 11050' to 11085'. AST = 0, ART = 2.26 INT1 Circ cuttings sample up for geologist. Geologist calls TD - 11085' MD. INTi POH to 10915', pump high vis sweep. Circ until clean. INTi POH to 9310', up weight = 270K. Intermittent drag to 25K over, monitor well. INTi RIH to 11010', fill pipe, break circ & tag bottom C~3 11085'. 1NT1 Pump high vis sweep on bottom, POH to 11010'. pump sweep to surface &circ until clean. Rotate & reciprocate. UWT = 245K, DWT = 155K, RWT = 190K. Torque off bottom = 17-19K on bottom = 16-18K. Pump C~2 492 gpm ~ 2300 psi off bottom / 2650 psi on bottom. INTi Circ sweep out, pump until clean ~ 495 gpm C~3 2300 psi. Rotate & reciprocate. RIH to 11085', pump liner running pill & spot with dry job. INT1 POH from 11085' to 816', UWT= 315K. No problems or tight spots. Dropped 2 3/8" rabbit ~ 7421' (6600' drill pipe). Remove top drive blower hose & install air slips. INTi L/D BHA, flush tools, down load MWD. Clear & clean rig floor. LNR1 Pull wear ring & install test plug. PJSM. Change top pipe rams to 7". LNR1 M/U test joint & test 7" rams to 250/ low & 3500 psi high. Rig down test equipment, install wear ring. LNR1 R/U to run 7" casing. LNR1 RIH with 7" 26# L-80 BTC-M liner. Fill every joint & top off every 5 joints. Make pipe up to mark. P/U liner hanger/packer. Liner weight = 115K. LNR1 R/D casing tools. Circ 1 liner volume, stage pump up to 5 bpm ~ 400 psi. LNRi RIH with 7" liner on 5" drill pipe to top of window C~ 6548'. LNRi Stage pumps up, circ bottoms up 1 1/2 times. Pump ~ 3 bpm ~ 380 psi. Lost approx 10 bbl mud. UWT = 140K, DWT = 120K. LNR1 Circ 1 DP & liner volume at the window at 6548' MD. LNR1 Run 7" liner in to open hole C~3 60 FPM max run speed. Liner went to bottom without problems. Obtain PU & SO wts in OH while running liner. LNR1 RU plug dropping head and lines for cement job. LNRi Break circulation and stage pumps up to 6 bpm over 15 minutes. LNR1 PJSM. Nabors, BP, Veco. Baker. LNRi Continue circulating at 6 bpm while batch mixing tail slurry. LNR1 Switch to cementers. Pump 3 bbls water. Test lines to 4000 psi. LNR1 Pump 35 bbls Mudpush II spacer at 12.3 ppg. 4.5 bpm @ 700 psi. LNR1 Switch to lead slurry. Pump 126 bbls (215 sx) Class G lead Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Operations Summary Report Page 5 of 10 Legal Well Common W Event Nam Contractor Rig Name: Date ~ Name: 0 ell Name: 0 e: Name: From - To 6-06 6-06 REENTE NABOB NABOB Hours ' R+COM S ALASK S 2ES Task PLET A DRI Code ~' E LLING NPT Start I Rig Rig Phase Spud Date: 2/21/1976 : 6/26/2005 End: 7/18/2005 Release: 7/21/2005 Number: Description of Operations 7/7/2005 07:00 - 08:00 1.00 CEMT P LNR1 slurry at 11.0 ppg. 5 bpm C~ 700 psi -start. 4.5 bpm ~ 780 psi - final. Switch to tail slurry and pump 35 bbls (170 sx) premium Class G with Latex at 15.8 ppg. 4.5 bpm @ 850 psi. 08:00 - 09:00 1.00 CEMT P LNRi Switch to mud and start displacement. Caught filuid at 12 bbls away. Pump at 5.1 bpm C~3 525 psi -start. PU liner wiper plug at 108 bbls away - 4 bpm C~3 930 psi. Continue displacing at 5.5 bpm. Slow to 4 bpm C~ 710 psi with 260 bbls away and 2 bpm @ 275 bbls away. Bump plug at 283.6 bbls away with 1000 psi. CIP at 09:00 hrs. 09:00 - 09:30 0.50 CEMT P LNR1 Slack off to 100 klbs and bleed pressure to zero. Apply 15 RH turns to DP & pressure back up to 1000 psi. Pick up and verify released off liner - OK. Circ 500 stks at 12 bpm to move cement up hole. Slack off to 50 klbs & rotate slowly to set LTP. 09:30 - 12:00 2.50 CEMT P LNR1 Circ out any excess cement C~? 13 bpm. Estimate approx 30 bbls cement back to surface. Pump dry job. R/D & flush cement head & hoses. Blow down top drive & hoses. 12:00 - 16:30 4.50 CEMT P LNR1 POH VD 5" drill pipe from 6300'. 16:30 -.17:00 0.50 CEMT P LNR1 POH & VD Baker liner running tool. Clear rig floor. 17:00 - 19:00 2.00 CASE P TIEBi RIH with 5° drill pipe from derrick to 4083'. 19:00 - 20:30 1.50 CASE P TIEB1 Cut & slip 88' of drilling line. Service top drive & rig. 20:30 - 23:00 2.50 CASE P TIEB1 POH VD 5" drill pipe from 4083'. 23:00 - 23:30 0.50 CASE P TIEB1 Pull wear ring. Clear rig floor of tools. 23:30 - 00:00 0.50 CASE P TIEBi R/U to run 7", L-80, BTC-M x TCII, 26#, liner tie-back. 7/8/2005 00:00 - 07:00 7.00 CASE P TIE61 PJSM with Nabors, Nabors casing & Baker. P/U seal asst' & RIH with 7", 26#, L-80, BTC-M x TCII liner tie- back. 07:00 - 12:30 5.50 CASE P TIEB1 MU final joint (XO) &RIH. Insert seal assembly fully into SBR to verify spaceout. LD short bails & RU long bails. Install cement head & hook up lines. Apply 500 psi & PU keeping pressure on string. Watch for pressure drop as ports are exposed. Pump to verify ports are exposed - OK. 12:30 - 12:45 0.25 CEMT P TIE61 PJSM. BP. NAD. Baker. Dowell. Discuss plan forward & identify hazards. 12:45 - 13:00 0.25 CEMT P TIEB1 Air up & prime up cementers. Pump 5 bbls water and test lines to 3500 psi - OK. 13:00 - 14:00 1.00 CEMT P TIEBi Pump 15 bbls viscosified water spacer followed by 100 bbls diesel freeze protect - 2 bpm @ 800 psi. Release bottom plug. 14:00 - 14:45 0.75 CEMT P TIEBi Mix & pump 84 bbls (260 sx) Class G lead cement at 13.5 ppg. 4.5 bpm C~ 1150 psi. Follow with 29 bbls (140 sx) Premium Class G tail slurry. 2.5 bpm ~ 600 psi. Kick out top plug with 5 bbls water from cementers to flush line. 14:45 - 18:00 3.25 CEMT P TIEB1 Switch to rig pumps. Close annular & divert returns thru line off wellhead spool out to cuttings tank. Displace at 9.5 bpm. Did not bump plug. Sting in to SBR with seal assembly & bottom out on no-go. CIP at 15:20 hrs. Bleed off pressure & verify no communication - OK. 18:00 - 00:00 6.00 WHSUR P TIE61 N/D BOPE. Split stack ~ casing spool & raise. Pull 150K tension on 7" casing. Set emergency slips & RILDS. Set up Cameron casing cutter/beveler & make cut on casing. Remove cut joint, VD mouse hole & set BOP stack back. Install pack-off & test to 3500 psi. Install tubing spool. N/U BOPE. 7/9/2005 00:00 - 03:00 3.00 BOPSU P TIE61 N/U BOPE. Test 7" x 9 5/8" pack-off to 4300 psi. (80 % of collapse of 7" casing) Install secondary valve. Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Operations Summary Report Legal Well Name: 06-06 Common Well Name: 06-06 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 2ES Date ~ From - To ~ Hours~Task j Code NPT -- Page 6 of 10 Spud Date: 2/21/1976 Start: 6/26/2005 End: 7/18/2005 Rig Release: 7!21/2005 Rig Number: Phase Description of Operations 7/9/2005 03:00 - 04:00 1.00 BOPSU P TIEB1 04:00 - 04:30 0.50 BOPSU P TIEB1 04:30 - 08:30 4.00 BOPSU P TIE61 08:30 - 09:00 0.50 BOPSU~ P 09:00 - 13:00 4.00 DRILL P 7/10/2005 13:00 - 20:30 7.50 STKOH P 20:30 - 23:30 3.00 STKOH P 23:30 - 00:00 00:00 - 00:30 00:30 - 01:00 01:00 - 05:00 0.50 STKOH P 0.50 CASE P 0.50 DRILL P 4.00 STKOH P 05:00 - 05:30 05:30 - 07:30 07:30 - 08:30 08:30 - 09:30 09:30 - 11:30 11:30 - 12:30 12:30 - 13:00 13:00 - 00:00 7/11/2005 100:00 - 03:00 03:00 - 03:30 03:30 - 04:00 04:00 - 04:30 04:30 - 08:00 08:00 - 10:00 10:00 - 12:00 12:00 - 16:30 16:30 - 17:00 0.50 STKOH P 2.00 STKOH P 1.00 STKOH P 1.00 STKOH P 2.00 STKOH P 1.00 STKOH P 0.50 STKOH P 11.00 STKOH P 3.001 DRILL I P 0.50 STKOH P 0.50 STKOH P 0.50 STKOH P 3.50 STKOH P 2.00 STKOH P 2.00 STKOH P 4.50 STKOH P 0.50 TIEB1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PRODi PROD1 PRODi PROD1 PRODi PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Change top rams from 7" to 3.5" x 6". Make up test joint & test plug, set same. R/U and test BOPE to 250 low & 3500 psi high test, test annular preventor to 2500. Witness of test waived by AOGCC rep. John Crisp. Test witnessed by WSL Dick Maskell & Jim Willingham. Pull test plug, install wear bushing, L/D test joint. Clear rig floor. P/U BHA & 6 118" HTC MX09DX bit WJ3-13s. M/U mud motor & MWD tools, upload & pulse check. Load nuke tools, P/U drill collars to 376'. Test MWD. RIH P/U 4" HT40 drill pipe to 2200', POH and rack pipe back in derrick. RIH P/U drill pipe to 6072'. Tag cement Q 6072', Drill cement from 6072' to 6370' (3' above landing collar). UWT = 185K, DWT = 100K, RWT = 115K. Torque = 5K C~ 55 rpm. Pump C 225 gpm C~ 2000 psi. Test 7" casing to 3500 psi. Test 7" casing to 3500 psi C~3 6370', OK. Drill cement & float collar C~3 6372'. CBU. RIH P/U 4" HT40 drill pipe to 9150'. Float in driN string not holding, mud flowing over the drill pipe. Attempt to balance mud by circulating, no success. Pump dry job. RIH P/U HT40 drill pipe to 10966'. Test 7" casing to 3500 psi for 30 min, OK. Drill cement & float equipment from 10966' to 11080'. HWT = 245K, RWT = 145K, DWT = 120K. Torque off bottom = 12K, on bottom = 12K. Displace well to FloPro mud. Pump 100 bbl of fresh water, 50 bbl high vis spacer followed by 8.4 ppg FloPro mud. Drill from 11080', drill 7" shoe ~ 11085'. Drill new formation to 11105'. Torque off bottom = 4K, on bottom = 5.5K. Perform F.I.T. pressure up to 630 psi. Pressure bled down to 590 psi in 10 min. 9.7 ppg MW E. Drill geological pilot hole. UWT = 180K, DWT = 145K, RWT = 165K. Torque C~3 70 rpm = 4K. WOB = 10-20K. Pump @ 257 gpm. ART = 8.91 hrs. AST = .92. Drill to 11352'. Drill 6 1/8" pilot hole from 11352' to TD ~ 11581'. ART = .67 hr. HWT = 185K, SWT = 145K, RWT = 165K. Torque off bottom = 3-4K, on bottom = 3-5K. Circulate, prepare to displace well to fresh water. POH from 11581' to 7" casing shoe @ 11085'. Drop pump out sub opening dart, displace 8.4 ppg FloPro mud from well with fresh water, pump C~? 492 gpm C~3 2700 psi. POH with 6 1/8" bit & directional BHA for 3 1/2" tubing to set cement plug & P&A pilot hole. BHA -remove nukes, down load MWD, L/D MWD, bit & mud motor. Clear rig floor. R/U handling tools &RIH with 3 1/2" tubing cement string to 898'. R/D handling tools. RIH from 898' to 11541', With 4 " HT40 drill pipe. P/U single of drill pipe & pup joint for space out on cement job. M/U pump in sub, valve & cement line. Circ & prepare to to set P&A plug. Pump @ 495 gpm @ 2550 Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Page 7 of 10 Operations Summary Report Legal Well Name: 06-06 Common Well Name: 06-06 Spud Date: 2/21/1976 Event Name: REENTER+COMPLETE Start: 6/26/2005 End: 7/18/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/21/2005 Rig Name: NABOBS 2ES Rig Number: Date ~ From - To Hours Task Code ~ NPT Phase Description of Operations 7/11/2005 16:30 - 17:00 0.50 PROD1 psi. 17:00 - 18:00 i.00 STKOH P PROD1 PJSM. Prime up cementers, pump 2 bbl water & test lines to 18:00 - 18:30 0.50 STKOH P PROD1 18:30 - 20:00 1.50 STKOH P PROD1 20:00 - 21:30 I 1.501 STKOH I P PROD1 21:30 - 00:00 2.50 STKOH P PROD1 7/12/2005 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 03:00 2.00 DRILL P PROD1 03:00 -04:30 1.50 DRILL P PROD1 04:30 - 05:30 1.00 DRILL P PROD1 05:30 - 06:30 1.00 DRILL P PROD1 06:30 - 07:00 0.50 DRILL P PROD1 07:00 - 07:30 0.50 DRILL P PROD1 07:30 - 08:00 I 0.501 DRILL I N I SFAL I PROD1 08:00 - 11:00 3.00 DRILL P PROD1 11:00 - 11:30 0.50 DRILL P PROD1 11:30 - 16:30 5.00 DRILL P PROD1 16:30 - 17:30 1.00 DRILL P PROD1 17:30 - 20:00 I 2.501 DRILL I P I I PROD1 20:00 - 21:30 1.50 DRILL P PROD1 21:30 - 23:00 1.50 DRILL N SFAL PROD1 23:00 - 00:00 1.00 DRILL P PROD1 7/13/2005 00:00 - 02:00 2.00 DRILL P PROD1 02:00 - 03:00 1.00 DRILL P PROD1 03:00 - 05:00 2.00 DRILL P PROD1 05:00 - 08:30 3.50 DRILL P PROD1 08:30 - 09:00 0.50 DRILL P PROD1 2500 psi. Mix & pump 27 bbl (152 sacks) class "G" cement ~ 17.0 ppg @ 5 bpm ~ 100 psi. Switch to water & displace with 105.7 bbl ~ 5 bpm @ 200 psi, 4.8 bbl C~3 800 psi, CIP @ 17:45 hrs. Check for flow, slight but diminished in 2-3 min. R/D cement equip. POH from 11581' to 10793'. POH C~ 40 fpm. UWT = 200K. Wash down through cement from 10793' to 11070' Cam? 20 fpm, pump ~ 510 gpm ~ 2600 psi. Circ cement out between connections. CBU. Displace well to fresh water ~ 5 bpm until clean. (clean shaker possum bellys) POH from 11070' to 3605'. POH from 3605' to 898'. R/U handling tools & POH L/D 3 1/2" cement string. L/D tools & clear rig floor. M/U bit, mud motor &MWD. Upload-MWD. RIH with BHA to 351'. Pulse check MWD. RIH to dress cement plug to 3150'. Slip & cut drill line. Service top drive & crown. RIH to 5384'. Drill crew noticed that a stand of drill pipe had cut a "core" from one of the 3" x 12" pipe racking boards. POH looking for "wooden core" in drill string. Recovered core @ 3617'. (replaced pipe racking boards) RIH to 10980', wash down & tag cement C~ 11070'. Drill cement from 11070' to 11090'. Cement soft, no compressive strength. W OC. Cement set. Drill cement from 11090' to 11095'. WOB = 10K, pump @ 240 gpm @ 1200 psi, 50 rpm. CBU. Pump high vis sweep, displace well to 8.4 ppg FloPro mud, drop Circ sub opening dart. Open circ sub & displace @ 500 gpm. Rotate & reciprocate. Pump dry job. POH from 11095' to 8695'. Dropped object from derrick incident. Shut down rig for investigation. Half of a 1" line clamp securing top drive hyd line in derrick fell 60' to the rig floor. The other half of the clamp stayed on the hyd line, the retainer & bolts fell & landed in a gert 30' from the rig floor. Bolts backed out of clamp, top drive service loop hung up in derrick & dislodged clamp. Tighten all bolts on other clamps, perform spot check derrick inspection. Clamp is cast aluminum & weighs approx 2 oz. No personel hit or injured. POH from 8695' to 6505'. POH with bit & mud motor from 6505' to 350'. L/D motor & bit. Clear rig floor. P/U directional BHA, 2.12 mud motor & HTC MX09DX tri-cone insert bit. Down load/upload MWD, RIH to 360' & pulse check MWD. RIH to 11005'. Service top drive. Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Page 8 of 10 Operations Summary Report Legal Well Name: 06-06 Common Well Name: 06-06 Spud Date: 2/21/1976 Event Name: REENTER+COMPLETE Start: 6/26/2005 End: 7/18/2005 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 7/21/2005 Rig Name: NABOBS 2ES Rig Number: Date From - To I! Hours Task Code NPT Phase Description. of Operations 7/13/2005 09:00 - 21:00 12.00 DRILL P PROD1 Wash down to 11095'. Orient sraight up. Slide to 11123' Unable to slide, ABI hanging up.slide, tools hanging up. Add tube's to mud, add beads & nut plug pills. Sweep casing with EMI 920. Unable to slide. 21:00 - 00:00 3.00 DRILL P PROD1 Circ, pump dry job. Monitor well. POH for BHA from 11123' to 3255'. ABI inc. on bottom = 60.24 degrees, approx 24 DLS. 7114/2005 00:00 - 01:00 1.00 DRILL P PRODi POH from 3255' to 362'. 01:00 - 02:30 1.50 DRILL P PRODi BHA, down load & L/D MWD. Change out res. tool (low battery). Break & L/D bit & mud motor with ABI. 02:30 - 04:00 1.50 DRILL P PRODi BHA, P!U RR bit & 2.12 mud motor, orient, upload. RIH to 353' & pulse check. 04:00 - 07:30 3.50 DRILL P PROD1 RIH with BHA # 5 to 11000', wash down to 11123'. 07:30 - 08:00 0.50 DRILL PROD1 Service top drive. 08:00 - 00:00 16.00 DRILL P PRODi Orient high side, slide, build angle. Drill from 11123' to 11184'. UWT = 180K, DWT = 140K, RWT = 155K. WOB = 10-40K, pump Q 270 gpm ~ 1900 psi. Rotating 10 to 20 RPM when necessary to get bit back on bottom. 7/15/2005 00:00 - 08:30 8.50 DRILL P PRODi Drill/slide from 11184' to 11238'. ROP 3-4 fph, DLS less than - planned. UWT = 180K, DWT = 140K. 08:30 - 13:00 4.50 DRILL P PROD1 POH from 11238' to 11085', Wash & work through cuttings beds from 11130' to 11090'. Max UWT = 260K, DWT = 120K. Pump dry job, monitor well & POH from 11085' to 354'. 13:00 - 15:00 2.00 DRILL P PROD1 BHA, stand back HWDP, jars & flex drill collars. Flush MWD & mud motor. UD MWD, motor & bit. 15:00 - 18:00 3.00 DRILL P PROD1 P/U 5", 1.83 mud motor, change bend & bottom sleeve, M/U MWD & upload. Load nukes &RIH to 472', pulse check. 18:00 - 21:00 3.00 DRILL P PROD1 RIH w/ BHA # 7 to 11022'. 21:00 - 22:30 1.50 DRILL P PROD1 Slip & cut drill line. Lubricate rig & top drive. 22:30 - 23:30 1.00 DRILL P PROD1 Wash & ream from 11105' to 11238'. 23:30 - 00:00 0.50 DRILL P PROD1 Drill/slide from 11238' to 11247'. 7!16!2005 00:00 - 10:00 10.00 DRILL P PROD1 Slide to 11,420', Rotate & Slide to 11,622'. UWT = 180K, DWT = 130K, RWT = 150K. Pump = 242 gpm C~ 1950 psi. WOB = 2-15K. AST = 5.54 Hrs. ART = 1.46Hrs. Hole took 20 Bbl. drink @ 11,542'. Losses of 10 Bbl/Hr C~3 11,582. Sudden increase in losses to 65 Bbl/Hr @ 11,622'. Stop drilling. 10:00 - 12:00 I 2.001 LCR I N I DPRB I PROD1 12:00 - 15:30 I 3.501 LCR I N I DPRB I PROD1 Mix & pump a 36 Bbl, 40 Lb / Bb. Calcium Carbonate Pill (20 Lb/Bbl - 250 + 20 Lb/Bbl 40). Losses increased to 100 bbl ! Hr while pumping. Spot pill out of bit & POH into casing. Circulate over top of hole w/ Trip tank & monitor losses. Static losses @ 65 Bbl / Hr. POH from 11622' to 7" casing shoe ~ 11085'. Monitor losses, inform ODE & discuss options. Decision made to drill ahead w/ seawater. Secure 4 Vac trucks and have them load up w/ seawater. Pump another calcium carbonate pill while waiting on seawater. Static loses @ 50 Bbl / Hr. Load seawater into pits. Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Operations Summary Report Page 9 of 10 Legal Well Name: 06-06 Common Well Name: 06-06 Spud Date: 2/21/1976 Event Name: REENTER+COMPLETE Start: 6/26/2005 End: 7/18/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/21/2005 Rig Name: NABOBS 2ES Rig Number: Date From - To j Hours I Task ,.Code NPT Phase Description of Operations 7/16/2005 12:00 - 15:30 3.50 LCR N DPRB PROD1 15:30 - 16:00 0.50 LCR N DPRB PROD1 Spot 40 bbl calcium carbonate LCM pill C~3 11100. 16:00 - 18:00 2.00 LCR N DPRB PROD1 Monitor losses. 60 bbl hr loss rate. Change well over to seawater. Wash & ream from 11085' to 11622'. Pump C~3 250 gpm Ca? 1450 psi. 18:00 - 00:00 6.00 DRILL P PROD1 Dril/slide from 11622' to 11930'. Pump ~ 255 gpm C~3 1700 psi. WOB = 5-8K, rotate C~? 40 rpm, torque on bottom = 5-6K, off bottom = 5-6K. 7/17/2005. 00:00 - 06:30 6.50 DRILL P PROD1 Drill ,rotate & slide from 11930' to 12234'. Losing 110 bbl per hour to the well. Mix calcium carbonate for losses. Drilling with seawater. 06:30 - 07:30 1.00 DRILL P PRODi Pump high vis sweep, CBU ~ 250 gpm Cam? 1450 psi. 07:30 - 08:30 1.00 DRILL P PROD1 Short trip from 12234' to 7" shoe @ 11085'. Hole in good shape. 08:30 - 09:00 0.50 DRILL P PROD1 Lubricate rig. Service top drive. 09:00 - 09:30 0.50 DRILL P PROD1 RIH to bottom C~ 12234'. Hole in good shape. 09:30 - 11:30 2.00 DRILL P PROD1 Drill & slide from 12234' to 12322'. UWT = 190K, DWT = 130K, RWT = 160K. Toriaue on bottom= 8K, off = 6K. WOB = 5/10K. Pump C~? 250 gpm C~3 1500 psi. Losses to well increased to 360 bbl per hr. 11:30 - 12:00 0.50 DRILL P PROD1 Pick up above loss zone C~3 12305'. Monitor losses, static = 360 bph. Circ C~3 250 gpm C~? 1300 psi. 12:00 - 18:30 6.50 DRILL P PRODi Drill from 12332' to 12701'. 18:30 - 19:00 0.50 DRILL P PROD1 Circ. prepare for short trip. 19:00 - 20:00 1.00 DRILL P PROD1 Short trip. POH from 12701' to 7" shoe @ 11085'. Tight C«~ 12490', Pump 1 stand out. 20:00 - 20:30 0.50 DRILL P PROD1 RIH to bottom @ 12701', hole in good shape. 20:30 - 00:00 3.50 DRILL P PROD1 Drill /slide from 12701' to 12748', difficult to slide. Mix sweeps, beads & lubricants. 7/18/2005 00:00 - 06:00 6.00 DRILL P PROD1 Drill, slide/rotate to 13059'. Losses to well 220 bbl per hr. Sliding difficult, pump sweeps. Mix beads & lubricants. When pipe sits static (connections & surveys) string has a tendency to wall stick. Overpull will not break string free, rotation will. Torque on bottom = 13K, off = 11K. 06:00 - 07:30 1.50 DRILL P PROD1 Pump high vis sweeps, CBU @ 300 gpm @ 2150 psi. UWT = 260K, DWT = 110K, RWT ~ 165K. Monitor well. 07:30 - 12:00 4.50 DRILL P PRODi Short trip pump out from bottom C~? 13059' to 7" casing shoe C~? 11085'. Pump @ 275 gpm Cam? 1800 psi. Rotate @ 25 rpm, CBU. 12:00 - 13:30 1.50 DRILL P PROD1 Cut drill line, service top drive. 13:30 - 14:00 0.50 DRILL P PROD1 RIH from 11085' to bottom C~ 13059'. Hole in good shape. 14:00 - 15:00 1.00 DRILL P PROD1 Circ, spot liner running pill in open hole. 15:00 - 16:30 1.50 DRILL P PROD1 POH from 13059', pump out from 12290' to 7" shoe C~3 11085'. Pump @ 300 gpm C~ 1600 psi, rotate ~ 25 rpm. 16:30 - 17:30 1.00 DRILL P PROD1 Drop dart & shear pump out sub, pump sweep, ~ 500 gpm C~3 2430 psi. Rotating & reciprocating pipe, CBU. 17:30 - 21:00 3.50 DRILL P PRODi POH from 11085' to 378'. 21:00 - 23:30 2.50 DRILL P PROD1 BHA., L/D HWDP, jars & drill collars. Unload nukes & down load MW D. UD MWD, bit & mud motot. Clear & clean rig floor. 23:30 - 00:00 0.50 CASE P RUNPRD R/U to run 4.5", 12.6#, L-80, IBT-M, slotted liner. Total fluid lost to well = 8572 bbl. 7/19/2005 00:00 - 03:00 3.00 CASE P RUNPRD PJSM with drill crew, Baker Rep. & WSL. RIH with 4.5", 12.6# L-80, IBT-M slotted liner. Printed: 7/25/2005 8:04:26 AM BP EXPLORATION Page 10 of 10 Operations Summary Report Legal Well Name: 0 6-06 Common W ell Name: 0 6-06 Spud Date: 2/21/1976 Event Nam e: REENTE R+COM PLET E Start : 6/26/2005 End: 7/18/2005 Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: 7/21/2005 Rig Name: NABOB S 2ES Rig Number: Date From - To ' Hours Task ~ Code NPT I Phase Description of Operations --~ ~ _. __ 7/19/2005 03:00 -04:00 1.00 CASE P RUNPRD M/U liner hanger & ZXP packer, mix & install PAL-MIX (debris barrier) 04:00 - 07:30 3.50 CASE P RUNPRD RIH with liner on drill pipe. Losing 147 bbl per hr of seawater to well. 07:30 - 08:00 0.50 CASE P RUNPRD Cicr DP volume ~ 11,085' - 3 BPM ~ 200 psi. 08:00 - 08:30 0.50 CASE P RUNPRD RIH w/ 4.5" slotted liner f/ 11,085' to 13,059'. No problems. 08:30 - 10:30 2.00 CASE P RUNPRD Tag btm ~ 13,059'. PU 2' to 13,057'. Pumped 10 bbls. Drop ball and pump 3 BPM @ 220 psi. Press to 2,500 psi to set hanger. Hold 2 min. Set down 45k on hanger. Pump to 3,850 psi to release Running tool. PU 5' and set down 45K 3X to set liner top packer. Good surface indication pkr set. Pressure annulus to 1,500 psi and held 5 min. OK. Attempt to rotate on liner top. Torque to high. Pulled 1 stand. 10:30 - 17:30 7.00 CASE P RUNPRD PJSM. LD 4" DP ,pups, XO, and running tool. 17:30 - 18:30 1.00 CASE P RUNPRD RIH w! 4" DP to 2,250'. 18:30 - 20:00 1.50 CASE P RUNPRD POOH laying down 4" DP. 20:00 - 20:30 0.50 BUNCO RUNCMP Pulled wear bushing and MU XO's on landing jt. 20:30 - 21:30 1.00 BUNCO RUNCMP Rig up to run 4.5" 13CR80 Vam Top tubing. PJSM. 21:30 - 00:00 2.50 BUNCO RUNCMP. MU and run tail pipe and packer. RIH' FEU 4.5" 13Cr80 tubing to 1016' 7/20/2005 00:00 - 06:00 6.00 BUNCO RUNCMP RIH PU 4.5" 13Cr80 tubing to 6,637'. 06:00 - 06:30 0.50 BUNCO RUNCMP Lubricate and service top drive. 06:30 - 11:00 4.50 BUNCO RUNCMP RIH PU 4.5" Cr80 tubng to 10,941'. 11:00 - 13:00 2.00 BUNCO RUNCMP Space out tubing w/ WLEG 9' inside 7" liner tie back sleeve. MU tubing hanger and landing jt. Land tubing and RILDS. UP 165K, DWN 100k. 13:00 - 14:00 1.00 BUNCO RUNCMP Reverse circ inhibited sea water to packer.- 200 gpm C~ 350 psi. 14:00 - 16:00 2.00 BUNCO RUNCMP Dropped ball and rod. Pressured tubing to 3,500' psi and set packer @ 10,896'. Held 3,500 psi for 30min. tubing test. Test annulus / packer to 3,500 psi for 30 min. Held. Bleed off tubing pressure and sheared DCK shear valve. 16:00 - 16:30 0.50 BUNCO RUNCMP Set TWCV in tbg hanger and tested to 1,000 psi form below. 16:30 - 17:30 1.00 BOPSU P WHDTRE ND BOP's. 17:30 - 19:00 1.50 WHSUR P WHDTRE NU 4 1/8" 5M tree and tbg head adaptor. 19:00 - 21:00 2.00 WHSUR P WHDTRE Test tbg hanger, adaptor, and tree to 5,000 psi. Held. 21:00 - 21:30 0.50 WHSUR P WHDTRE RU lubricator and pulled TWCV. 21:30 - 23:00 1.50 WHSUR P WHDTRE RU lines. Reverse circ 75 bbls diesel freeze protection. 23:00 - 00:00 1.00 WHSUR P WHDTRE U-Tube diesel. 7/21/2005 00:00 - 00:30 0.50 WHSUR P WHDTRE Dry rod BPV. Test from below to 1,000 psi. 00:30 - 01:30 1.00 WHSUR P WHDTRE Blow down lines. Empty cellar. Remove double valve from tbg head and install gage. Secure well. Rig released @ 0130 hrs 7-21-05. Printed: 7/25/2005 8:04:26 AM Halliburton Sperry-Sun North Slope Alaska BPXA 06-06BPB 1 Job No. AKZZ3795164, Surveyed: 11 July, 2005 Survey Report 3 August, 2005 Your Ref.• API 500292020170 Surface Coordinates: 5940735.11 N, 685928.21E (70° 14' 34.9624" N, 148° 29' 53.6118" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 65.80ft above Mean Sea Level ~p~r~r~r„~-stn ~!~,~-~~~~ ~~~~~+~~~ SurveyRef:sry4641 A HaiIIbWE'F.tsn Company • Halliburton Sperry-Sun Survey Report for 06-066P81 Your Ref.• AP1500292020170 Job No. AKZZ3795164, Surveyed: 11 July, 2005 North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 6505.80 62.580 196.000 5348.86 5414.66 2295.33 S 400.33 W 6548. 00 62. 550 196.000 5368.30 5434.10 6571. 46 63. 490 193.860 5378.94 5444.74 6600. 39 63. 390 191.200 5391.88 5457.68 6632. 75 61. 950 188.210 5406.74 5472.54 6663. 41 61. 200 185.360 5421.34 5487.14 6695. 12 60. 520 186.240 5436.78 5502.58 6727. 66 60. 190 182.950 5452.88 5518.68 6758. 69 59. 520 183.400 5468.46 5534.26 6789. 57 59. 230 186.660 5484.19 5549.99 6820. 68 58. 990 186.750 5500.17 5565.97 6853. 61 58. 280 181.400 5517.31 5583.11 6883. 00 57. 350 177.220 5532.97 5598.77 6914. 26 57. 630 173.440 5549.78 5615.58 6946. 62 57. 860 172.650 5567.05 5632.85 6978. 02 58. 220 174.170 5583.67 5649.47 7010. 94 58. 360 175.550 5600.97 5666.77 7044. 73 58. 190 176.290 5618.74 5684.54 7072. 47 57. 870 176.480 5633.43 5699.23 7108. 50 56. 270 175.920 5653.02 5718.82 7140. 36 54. 640 176.290 5671.08 5736.88 7168. 65 53. 490 176.880 5687.68 5753.48 7200. 58 51. 740 176.850 5707.07 5772.87 7232. 63 50. 000 179.020 5727.30 5793.10 7263. 00 48. 390 180.000 5747.14 5812.94 7295. 27 46. 320 180.490 5769.00 5834.$0 7326. 96 45. 000 183.460 5791.15 5856.95 7358. 54 44. 130 183.410 5813.65 5879.45 7390 .44 42 .320 185.790 5836.90 5902.70 7422 .49 40 .400 186.430 5860.95 5926.75 7453 .26 39 .020 188.750 5884.63 5950.43 7484. 16 37 .370 188.810 5908.91 5974.71 7516. 00 35. 720 192.460 5934.49 6000.29 7545. 56 34. 270 194.770 5958.71 6024.51 7578 .42 32 .270 196.670 5986.18 6051.98 2331.33 S 2351.53 S 2376.79 S 2405.12 S 2431.89 S 2459.44 S 2487.63 S 2514.42 S 2540.88 S Global Coordinates Northings Eastings (ft) (ft) 5938430.60 N 685584.61 E 5938394.36 N 685575.18 E 5938374.03 N 685570.30 E 5938348.64 N 685565.31 E 5938320.20 N 685561.16 E 5938293.36 N 685558.63 E 5938265.75 N 685556.51 E 5938237.52 N 685554.94 E 5938210.69 N 685554.12 E 5938184.18 N 685552.44 E Dogleg Vertical Rate Section Comment (°/100ft) 1651.95 Tie On Point MW D+I I FR+MS 0.071 1681.17 Window Point 9.063 1697.23 8.231 1716.39 9.337 1736.71 8.533 1754.76 3.236 1772.95 8.845 1791.07 2.497 1807.75 9.133 1824.93 2567.40 S 441.69 W 5938157.60 N 685549.98E 0.810 1842.79 2595.43 S 443.69 W 5938129.53 N 685548.67E 14.037 1860.60 2620.29 S 443.40 W 5938104.68 N 685549.58E 12.445 1874.71 2646.56 S 441.25 W 5938078.47 N 685552.38E 10.236 1888.12 2673.72 S 437.94 W 5938051.40 N 685556.36E 2.183 1901.10 2700.19 S 434.88 W 5938025.02 N 685560.07E 4.264 1913.88 2728.08 S 432.37 W 5937997.20 N 685563.26E 3.591 1927.93 2756.75 S 430.33 W 5937968.59 N 685566.01E 1.930 1942.81 2780.23 S 428.84 W 5937945.15 N 685568.08E 1.292 1955.16 2810.41 S 426.84 W 5937915.03 N 685570.82E 4.628 1970.94 2836.59 S 425.06 W 5937888.90 N 685573.25E 5.205 1984.60 2859.45 S 423.69 W 5937866.08 N 685575.18E 4.402 1996.69 2884.78 S 422.30 W 5937840.79 N 685577.19E 5.481 2010.18 2909.63 S 421.40 W 5937815.98 N 685578.71E 7.553 2023.78 2932.61 S 421.20 W 5937793.00 N 685579.47E 5.837 2036.89 2956.35 S 421.30 W 5937769.27 N 685579.96E 6.511 2050.67 2978.99 S 422.08 W 5937746.61 N 685579.74E 7.891 2064.38 3001.11 S 423.40 W 5937724.47 N 685578.96E 2.757 2078.23 3022.89 S 425.15 W 5937702.66 N 685577.75E 7.635 2092.23 3043.94 S 427.40 W 5937681.55 N 685576.02E 6.134 2106.22 3063.43 S 429.99 W 5937662.01 N 685573.91E 6.581 2119.58 3082.31 S 432.91 W 5937643.06 N 685571.46E 5.341 2132.87 3100.94 S 436.39 W 5937624.35 N 685568.44E 8.568 2146.47 3117.41 S 440.38 W 5937607.78 N 685564.86E 6.644 2159.23 3134.76 S 445.25. W 5937590.32 N 685560.42E 6.863 2173.23 410.66 W 416.04 W 421.66 W 426.51 W 429.69 W 432.49 W 434.76 W 436.24 W 438.57 W BPXA J • 3 Augusf, 2005 - 17:36 Page 2 of 5 Dril/Quest 3.03.06.008 Halliburton Sperry-Sun Survey Report for 06-O1i8P81 Your Ref.• API 500292020170 Job No. AKZZ3795164, Surveyed: 11 July, 2005 North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Dept h Incl. Azim. Depth Depth Northings Easti ngs Northings Eastings Rate (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 7612. 57 30. 200 198.420 6015.38 6081.18 3151 .65 S 450 .58 W 5937573.31 N 685555.50E 6.618 7640. 47 28. 740 199.320 6039.67 6105.47 3164 .64 S 455 .02 W 5937560.21 N 685551.39E 5.468 7673. 48 26. 890 204.110 6068.87 6134.67 3178 .94 S 460 .69 W 5937545.77 N 685546.07E 8.786 7704. 41 25. 790 207.090 6096.59 6162.39 3191 .32 S 466 .62 W 5937533.25 N 685540.45E 5.560 7736. 22 25. 050 209.970 6125.32 6191.12 3203 .31 S 473 .13 W 5937521.10 N 685534.24E 4.529 7768. 52 24. 620 214.520 6154.63 6220.43 3214 .78 S 480 .36 W 5937509.46 N 685527.29E 6.063 7799. 91 24. 350 217.060 6183.20 6249.00 3225 .33 S 487 .97 W 5937498.72 N 685519.95E 3.462 7831. 39 23. 620 221.630 6211.97 6277.77 3235 .23 S 496 .07 W 5937488.63 N 685512.09E 6.339 7863. 49 22. 730 224.870 6241.48 6307.28 3244 .43 S 504 .72 W 5937479.22 N 685503.67E 4.843 7893. 38 21. 680 225.960 6269.15 6334.95 3252 .36 S 512 .76 W 5937471.09 N 685495.83E 3.773 7923. 48 20. 760 230.520 6297.21 6363.01 3259 .62 S 520 .87 W 5937463.64 N 685487.90E 6.276 7957. 63 20. 410 234.840 6329.18 6394.98 3266 .89 S 530 .41 W 5937456.13 N 685478.54E 4.563 7987. 94 20. 420 239.810 6357.59 6423.39 3272 .60 S 539 .31 W 5937450.21 N 685469.79E 5.718 8019. 41 20. 430 246.710 6387.09 6452.89 3277 .53 S 549 .10 W 5937445.03 N 685460.12E 7.648 8051. 60 20. 450 252.670 6417.25 6483.05 3281 .43 S 559 .63 W 5937440.88 N 685449.69E 6.464 8083. 50 20. 600 258.680 6447.13 6512.93 3284 .19 S 570. 45 W 5937437.85 N 685438.94E 6.620 8114. 88 20. 480 264.380 6476.52 6542.32 3285 .81 S 581. 33 W 5937435.96 N 685428.11E 6.382 8208. 52 20. 030 265.850 6564.37 6630.17 3288 .58 S 613 .63 W 5937432.40 N 685395.89E 0.725 8303. 71 19. 570 265.730 6653.93 6719.73 3290 .94 S 645 .78 W 5937429.24 N 685363.80E 0.485 8397. 73 20. 970 264.070 6742.13 6807.93 3293 .85 S 678 .22 W 5937425.53 N 685331.44E 1.610 8491. 72 21. 420 265.490 6829.76 6895.56 3296 .94 S 712 .06 W 5937421.61 N 685297.69E 0.726 8585. 74 22. 180 266.030 6917.05 6982.85 3299 .52 S 746. 88 W 5937418.17 N 685262.94E 0.836 8679. 92 21. 240 265.550 7004.55 7070.35 3302 .07 S 781 .62 W 5937414.76 N 685228.27E 1.016 8775. 04 22. 110 267.500 7092.95 7158.75 3304 .19 S 816 .69 W 5937411.78 N 685193.27E 1.187 8870. 19 22. 650 266.210 7180.93 7246.73 3306 .18 S 852 .86 W 5937408.90 N 685157.16E 0.767 8964. 84 21. 990 265.550 7268.49 7334.29 3308 .76 S 888 .71 W 5937405.43 N 685121.38E 0.746 8996. 70 22. 370 265.600 7297.99 7363.79 3309 .69 S 900 .70 W 5937404.21 N 685109.42E 1.194 9028. 38 23. 210 265.270 7327.20 7393.00 3310 .67 S 912. 93 W 5937402.93 N 685097.21E 2.682 9058. 80 24. 250 265.560 7355.05 7420.85 3311 .65 S 925 .14 W 5937401.65 N 685085.04E 3.440 9089. 41 24. 800 265.050 7382.89 7448.69 3312 .69 S 937 .80 W 5937400.30 N 685072.41E 1.925 9121. 72 25. 550 264.660 7412.14 7477.94 3313 .92 S 951 .49 W 5937398.73 N 685058.75E 2.377 9152. 10 26. 750 264.230 7439.41 7505.21 3315 .22 S 964 .81 W 5937397.10 N 685045.46E 3.999 9184. 14 27. 770 264.210 7467.89 7533.69 3316 .70 S 979 .42 W 5937395.27 N 685030.90E 3.184 9215. 51 28. 750 264.320 7495.52 7561.32 3318 .18 S 994. 19 W 5937393.42 N 685016.17E 3.128 9246. 91 29. 930 264.540 7522.89 7588.69 3319 .67 S 1009 .51 W 5937391.55 N 685000.89E 3.774 Vertical Section 2187.33 2198.45 2211.34 2223.32 2235.57 2248.09 2260.39 2272.72 2285.09 2296.24 2307.05 2319.04 2329.60 2340.44 2351.29 2361.72 2371.54 2399.51 2427.13 2455.30 2484.71 2514.63 2544.47 2574.33 2605.01 2635.78 2646.10 2656.66 2667.19. 2678.13 2690.01 2701.64 2714.42 2727.34 2740.71 BPXA Comment • 3 August, 2005 - 17:35 Page 3 of 5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for 06-066P81 Your Ref: API 500292020170 Job No. AK2Z3795164, Surveyed: 11 July, 2005 North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 9279.08 31.250 264.960 7550.58 7616.38 3321.17 S 1025.81 W 5937389.65 N 684984.63E 4.157 2754.88 9313.29 33.090 264.440 7579.54 7645.34 3322.85 S 1043.94 W 5937387.52 N 684966.55E 5.439 2770.67 9342.49 35.000 265.050 7603.73 7669.53 3324.35 S 1060.22 W 5937385.62 N 684950.31E 6.645 2784.82 9372.85 36.230 265.130 7628.41 7694.21 3325.86 S 1077.84 W 5937383.67 N 684932.74E 4.054 2800.08 9403.52 37.530 265.280 7652.95 7718.75 3327.40 S 1096.18 W 5937381.68 N 684914.44E 4.249 2815.94 9436.09 39.390 266.180 7678.45 7744.25 3328.90 S 1116.38 W 5937379.68 N 684894.28E 5.964 2833.30 9467.40 41.050 265.520 7702.35 7768.15 3330.37 S 1136.54 W 5937377.72 N 684874.16E 5.474 2850.61 9503.18 43.040 264.240 7728.92 7794.72 3332.51 S 1160.41 W 5937374.99 N 684850.36E 6.056 2871.34 9532.13 45.270 264.310 7749.69 7815.49 3334.52 S 1180.47 W 5937372.48 N 684830.35E 7.705 2888.88 9562.94 47.880 264.360 7770.87 7836.67 3336.73 S 1202.74 W 5937369.73 N 684808.14E 8.472 2908.34 9594.26 50.530 265.170 7791.33 7857.13 3338.89 S 1226.35 W 5937366.98 N 684784.60E 8.684 2928.86 9625.97 52.500 265.580 7811.06 7876.86 3340.89 S 1251.09 W 5937364.37 N 684759.91E 6.294 2950.22 9657.18 53.480 265.890 7829.85 7895.65 3342.75 S 1275.94 W 5937361.91 N 684735.11E 3.239 2971.58 9719.61 54.630 266.650 7866.50 7932.30 3346.03 S 1326.37 W 5937357.38 N 684684.78E 2.089 3014.66 9814.09 56.960 265.070 7919.61 7985.41 3351.69 S 1404.30 W 5937349.80 N 684607.01E 2.827 3081.55 9908.26 57.140 265.950 7970.83 8036.63 3357.87 S 1483.07 W 5937341.68 N 684528.41E 0.807 3149.45 10001.78 56.580 265.490 8021.96 8087.76 3363.71 S 1561.16 W 5937333.91 N 684450.49E 0.727 3216.58 10097.73 56.140 265.980 8075.11 8140.91 3369.66 S 1640.82 W 5937326.01 N 684371.00E 0.625 3285.06 10191.54 57.560 265.770 8126.41 8192.21 3375.31 S 1719.16 W 5937318.42 N 684292.$3 E 1.525 3352.29 10286.11 57.410 266.420 8177.24 8243.04 3380.74 S 1798.72 W 5937311.03 N 684213.43E 0.601 3420.39 10381.30 57.500 266.500 8228.45 8294.25 3385.69 S 1878.81 W 5937304.10 N 684133.49E 0.118 3488.64 10475.86 56.920 263.800 8279.67 8345.47 3392.41 S 1958.01 W 5937295.44 N 684054.48E 2.477 3557.19 10570.04 56.670 264.470 8331.24 8397.04 3400.46 S 2036.39 W 5937285.45 N 683976.31E 0.652 3625.84 10664.41 56.130 263.250 8383.47 8449.27 3408.86 S 2114.54 W 5937275.13 N 683898.39E 1.219 3694.51 10758.49 55.270 263.310 8436.48 8502.28 3417.96 S 2191.73 W 5937264.13 N 683821.46E 0.916 3762.78 10852.45 55.630 263.820 8489.77 8555.57 3426.63 S 2268.63 W 5937253.56 N 683744.79E 0.589 3830.58 10947.38 56.740 265.950 8542.60 8608.40 3433.65 S 2347.18 W 5937244.61 N 683666.44E 2.200 3898.77 11021.66 57.130 267.340 8583.13 8648.93 3437.29 S 2409.32 W 5937239.43 N 683604.41E 1.654 3951.62 11079.90 56.960 267.980 8614.81 8680.61 3439.29 S 2458.15 W 5937236.23 N 683555.64E 0.967 3992.64 11173.83 57.730 269.020 8665.50 8731.30 3441.36 S 2537.20 W 5937232.22 N 683476.67E 1.241 4058.38 11268.01 56.260 267.960 8716.80 8782.60 3443.43 S 2616.15 W 5937228.20 N 683397.79E 1.824 4124.04 11361.92 55.130 264.860 8769.73 8835.53 3448.27 S 2693.56 W 5937221.45 N 683320.53E 2.980 4190.05 11455.55 55.060 264.420 8823.31 8889.11 3455.45 S 2770.01 W 5937212.39 N 683244.28E 0.393 4256.61 11547.20 55.200 265.570 8875.71 8941.51 3462.01 S 2844.91 W 5937203.98 N 683169.56E 1.041 4321.56 11581.00 55.200 265.570 8895.00 8960.80 3464.15 S 2872.58 W 5937201.16 N 683141.95E 0.000 4345.39 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to-True North. BPXA • 3 August, 2005 - 17:36 Page 4 of 5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for 06-066P61 Your Ref.• API 500292020170 Job No. AKZZ3795164, Surveyed: 11 July, 2005 North Slope Alaska Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 234.740° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11581.OOft., The Bottom Hole Displacement is 4500.23ft., in the Direction of 219.667° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 6505.80 5414.66 2295.33 S 400.33 W Tie On Point 6548.00 5434.10 2331.33 S 410.66 W Window Point 11581.00 8960.80 3464.15 S 2872.58 W Projected Survey Survey tool program for 06-O6BPB1 From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 6505.80 5414.66 To Measured Vertical Depth Depth (ft) (ft) 6505.80 5414.66 11581.00 8960.80 Survey Tool Description CB-GYRO-MS (06-06) MWD+IIFR+MS (06-06BP61) BPXA L J 3 August, 2005 - 17:36 Page 5 of 5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun North Slope Alaska BPXA 06-06B Job No. AKZZ3795164, Surveyed: 19 July, 2005 Survey Report 3 August, 2005 Your Ref.• API 500292020102 Surface Coordinates: 5940735.11 N, 685928.21 E (70° 14' 34.9624" N, 148° 29' 53.6118" Vy) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 65.80ft above Mean Sea Level ~el"'~l"'~i-~-~LJC"1 t'arztt-~-~n~c~ s~~tv~c~s SurveyRef.•sry4643 A NalBlbur€an Company ~~ Halliburton Sperry-Sun Survey Report for 06-068 Your Ref.• API 500292020102 Job No. AKZZ3795164, Surveyed; 19 July, 2005 North Slope Alaska Measured True Sub-Sea Vertical Dept h Incl. Azim. Depth Dept h (ft) (ft) (ft) 11079. 90 56. 960 267.980 8614.81 8680. 61 11095. 00 57. 080 268.130 8623.03 8688. 83 11117. 62 62. 270 268.580 8634.45 8700. 25 11149. 34 69. 520 271.440 8647.40 8713. 20 11180. 50 73. 170 273.990 8657.36 8723. 16 11204. 58 78. 000 276.380 8663.36 8729. 16 11239. 56 84. 990 278.630 8668.53 8734. 33 11269. 43 88. 950 277.490 8670.11 8735. 91 11301. 17 93. 330 276.710 8669.48 8735. 28 11332. 61 97. 240 274.510 8666.58 8732. 38 11363. 33 99. 610 271.030 8662.08 8727. 88 11395. 18 100. 370 266.250 8656.55 8722. 35 11426. 35 100. 610 265.410 8650.88 8716. 68 11456. 06 100. 610 264.890 8645.41 8711. 21 11490. 24 97. 360 264.010 8640.07 8705. 87 11521. 26 94. 450 263.970 8636.88 8702. 68 11549. 67 92. 900 262.370 8635.06 8700. 86 11581. 51 92. 530 262.790 8633.55 8699. 35 11610. 01 90. 560 263.110 8632.78 8698. 58 11642. 14 90. 620 263.900 8632.45 8698. 25 11684. 75 90. 000 263.060 8632.22 8698. 02 11734. 74 89. 510 264.300 8632.43 8698. 23 11781. 14 90. 060 264.080 8632.61 8698. 41 11829. 00 90. 740 263.290 8632.27 8698. 07 11875. 36 90. 190 264.400 8631.90 8697. 70 11922. 48 90. 060 264.890 8631.79 8697. 59 11969. 96 88. 520 266.770 8632.38 8698. 18 12015. 78 87. 530 267.800 8633.96 8699. 76 12049. 70 87. 960 268.050 8635.29 8701. 09 12080. 85 88. 700 270.940 8636.20 8702. 00 12108. 52 88. 770 272.370 8636.81 8702. 61 12142. 48 88. 830 274.480 8637.52 8703. 32 12173. 06 89. 380 276.990 8638.00 8703. 80 12201. 62 90 .620 280.050 8638.00 8703. 80 12232. 85 91. 110 280.680 8637.53 8703. 33 Local Coordinates Northings Eastings (ft) (ftj 3439.29 S 2458.15 W 3439.72 S 2470.81 W 3440.28 S 2490.32 W 3440.25 S 2519.25 W 3438.85 S 2548.73 W 3436.74 S 3432.21 S 3428.03 S 3424.11 S 3421.05 S 3419.58 S 3420.32 S 3422.55 S 3425.02 S 3428.28 S 3431.51 S 3434.89 S 3438.99 S 3442.49 S 3446.12 S 3450.96 S 3456.47 S 3461.16 S 3466.43 S 3471.40 S 3475.79 S 3479.25 S 3481.42 S 3482.64 S 3482.92 S 3482.12 S 3480.09 S 3477.04 S 3472.80 S 3467.19 S 2571.95 W 2606.22 W 2635.75 W 2667.23 W 2698.38 W 2728.72 W 2760.07 W 2790.64 W 2819.74 W 2853.34 W 2884.02 W 2912.17 W 2943.70 W 2971.98 W 3003.90 W Global Coordinates Northings Eastings (ft) (ft) 5937236.23 N 683555.64 E 5937235.49 N 683543.00 E 5937234.45 N 683523.51 E 5937233.76 N 683494.59 E 5937234.44 N 683465.08 E 5937235.98 N 683441.82 E 5937239.66 N 683407.44 E 5937243.11 N 683377.82 E 5937246.25 N 683346.25 E 5937248.54 N 683315.04 E 5937249.26 N 683284.66 E 5937247.75 N 683253.34 E 5937244.77 N 683222.84 E 5937241.58 N 683193.81 E 5937237.49 N 683160.31 E 5937233.50 N 683129.71 E 5937229.44 N 683101.65 E 5937224.55 N 683070.23 E 5937220.36 N 683042.05 E 5937215.94 N 683010.23 E BPXA Dogleg Vertical Rate Section Comment (°I100ft) 3992.64 Tie On Point 1.151 4003.22 Window Point 23.008 4019.48 24.290 4043.08 14.046 4066.35 22.241 4084.08 20.970 4109.46 13.794 4131.16 14.017 4154.60 14.255 4178.27 13.604 4202.20 14.971 422$.22 2.759 4254.47 1.720 4279.65 9.843 4308.97 9.382 4335.89 7.833 4360.82 1.757 4388.94 7.003 4414.05 2.466 4442.21 3046.23 W 5937210.06 N 682968.03E 2.450 4479.57 3095.92 W 5937203.33 N 682918.49E 2.667 4523.32 3142.08 W 5937197.50 N 682872.46E 1.277 4563.72 3189.65 W 5937191.06 N 682825.04E 2.178 4605.60 3235.74 W 5937184.96 N 682779.08E 2.672 4646.11 3282.65 W 5937179.40 N 682732.29E 1.076 4686.95 3330.00 W 5937174.78 N 682685.05E 5.118 4727.61 3375.74 W 5937171.49 N 682639.37E 3.117 4766,21 3409.61 W 5937169.42 N 682605.54E 1.466 4794.57 3440.74 W 5937168.38 N 682574.43E 9.573 4820,15 3468.39 W 5937168.50 N 682546.76E 5.173 4842.27 3502.28 W 5937169.69 N 682512.83E 6.214 4868,77 3532.70 W 5937171.99 N 682482.35E 8.402 4891,85 3560.94 W 5937175.53 N 682454.01E 11.560 4912.46 3591.66 W 5937180.39 N 682423.16E 2.555 4934.30 3 August, 2005 - 17:38 Page 2 of 4 Dril/Quest 3.03.06.008 Halliburton Sperry-Sun Survey Report for 06-066 Your Ref: API 500292020102 Job No. AKZZ3795164, Surveyed: 19 July, 2005 North Slope Alaska Measured True Sub-Sea Vertical Dept h Incl. Azim. Depth Depth (ft) (ft) (ft) 12262. 77 91.540 281.800 8636.84 8702.64 12294. 13 91.480 284.450 8636.01 8701.81 12325. 25 90.860 286.220 8635.38 8701.18 12355. 39 90.680 289.400 8634.97 8700.77 12385. 80 90.120 292.040 8634.76 8700.56 12417. 95 90.120 295.160 8634.69 8700.49 12449. 53 90.250 297.100 8634.59 8700.39 12481. 05 90.250 297.840 8634.45 8700.25 12514. 32 90.620 299.580 8634.20 8700.00 12544. 94 91.360 301.350 8633.67 8699.47 12572. 48 91.110 302.520 8633.08 8698.88 12605. 33 90.560 304.000 8632.60 8698.40 12635. 58 89.690 304.700 8632.53 8698.33 12665. 07 89.200 305.190 8632.82 8698.62 12697. 13 89.510 305.060 8633.18 8698.98 12729. 94 89.010 304.680 8633.60 8699.40 12758. 31 89.940 305.780 8633.86 8699.66 12793. 63 91.300 308.930 8633.48 8699.28 12822. 64 90.930 311.130 8632.92 8698.72 12852. 77 90.120 315.410 8632.64 8698.44 Local Coordinates Northings Eastings (ft) (ft) 3461.36 S 3621.00 W 3454.24 S 3651.53 W 3446.01 S 3681.53 W 3436.79 S 3710.22 W 3426.04 S 3738.66 W 3413.17 S 3768.12 W 3399.26 S 3796.47 W 3384.72 S 3824.43 W 3368.74 S 3853.61 W 3353.22 S 3880.00 W 3338.65 S 3903.36 W 3320.64 S 3930.83 W 3303.57 S 3955.80 W 3286.68 S 3979.97 W 3268.23 S 4006.20 W 3249.48 S 4033.11 W 3233.11 S 4056.28 W 3211.69 S 4084.35 W 3193.03 S 4106.56 W 3172.39 S 4128.49 W Global Coordinates Northings Eastings (ft) (ft) 5937185.49 N 682393.69 E 5937191.85 N 682363.00 E 5937199.34 N 682332.80 E 5937207.85 N 682303.89 E 5937217.90 N 682275.20 E 5937230.04 N 682245.43 E 5937243.24 N 682216.74 E 5937257.09 N 682188.43 E 5937272.34 N 682158.87 E 5937287.21 N 682132.10 E 5937301.19 N 5937318.52 N 5937334.97 N 5937351.26 N 5937369.05 N 5937387.14 N 5937402.93 N 5937423.65 N 5937441.75 N 5937461.85 N 12888. 01 90.310 319.000 8632. 51 8698.31 3146 .53 S 4152.43 W 5937487.11 N 12919. 04 90.250 318.930 8632. 36 8698. 16 3123 .13 S 4172. 80 W 5937510.01 N 12947. 93 90.430 318.710 8632. 18 8697. 98 3101 .38 S 4191. 82 W 5937531.27 N 13025. 62 91.050 317.350 8631. 18 8696. 98 3043. 63 S 4243. 77 W 5937587.73 N 13059. 00 91.050 317.350 8630. 57 8696. 37 3019 .08 S 4266 .38 W 5937611.71 N All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 234.740° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13059.OOft., The Bottom Hole Displacement is 5226.56ft., in the Direction of 234.715° (True). 682108.39 E 682080.48 E 682055.10 E 682030.52 E 682003.85 E 681976.48 E 681952.91 E 681924.32 E 681901.66 E 681879.22 E 681854.66 E 681833.71 E 681814.16 E 681760.80 E 681737.59 E BPXA Dogleg Vertical Rate Section Comment (°I100ft) 4.009 4954.89 8.449 4975.71 6.025 4995.46 10.567 5013.56 8.874 5030.58 9.704 5047.20 6.157 5062.32 2.348 5076.76 5.347 5091.36 6.265 5103.95 4.343 5114.62 4.806 5126.65 3.691 5137.19 2.350 5147.17 1.049 5157.93 1.914 5169.08 5.077 5178.56 9.714 5189.11 7.689 5196.47 14.457 5202.46 10.201 5207.08 0.297 5210.21 0.984 5213.19 1.924 5222.26 0.000 5226.56 Projected Survey J 3 August, 2005 - 17:38 Page 3 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for 06-068 Your Ref.• API 500292020102 Job No. AKZZ3795164, Surveyed: 19 July, 2005 North Slope Alaska BPXA n,- ....- ...,- ...,. s-, Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 11079.90 11095.00 8680.61 3439.29 S 2458.15 W 8688.83 3439.72 S 2470.81 W Tie On Point • Window Point 13059.00 8696.37 3019.08 S 4266.38 W Projected Survey Survey tool program for 06-O6B From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 0.00 6505.80 5414.66 CB-GYRO-MS (06-06) 6505.80 5414.66 13059.00 8696.37 MWD+IIFR+MS (06-06BPB1) 3 August, 2005 - 17:38 Page 4 of 4 DrillQuest 3.03.06.008 r 0.6-06B IV~~~ ~~~~.~ HES 4-1/2" X Nipple ID = 3.813" _ 2,216` 9-5/8" CSG, 53.3#, L-80, .0707 bpf, ID = 8.535" 2438' TOP OF 9-5/8" ~ 2438' 13-3/8" CSG, 72#, MN-80, ID = 12.347" 2719' 4-1/2" TBG, 12.6#, 13Cr-80, Vam TOP Top of Window -6,548' 9-5/8" EZSV -6,571` 4-1/2" Tubing Stub _6,800' Top CMT P&A _11,100'. 11564' 4-1/2" BKR GBH SEAL ASSY, ID = 3.875" (4' OF SEALS) 11567' 9-518" X 4-1/2" BKR DB PKR TOP OF 7" LNR 11613' 11680' 4-1/2" OTIS XN NIP, ID = 3.725" MILLED OUT TO 3.80" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 11691' 9-5/8" CSG, 47#, MN-80, ID = 8.681" •• } _2,200` TOC 7" Tie-Back 26#, L-80 TC-II -3,224` 7" Tie-Back Seal Assy 26#, L-80 BTC-M --6,404` 7" LNR Top 26#, L-80 BTC-M --6,394` -10,876` HES 4-1/2" X Nipple ID = 3.813" _10,897' BKR 7" x 4-1/2" BKR PKR -10,920` HES 4-1/2" X Nipple ID = 3.813" -10,941` HES 4-1/2" XN Nipple ID = 3.725" -10,953' 4-1/2"WLEG \` ~~ 5"x 7" ZXP PKR -10,935' ~ 7" LNR 26#, L-80 BTC-M -11,085' 4-1/2" 12.6#, L-80 / Solid LNR _10,935' 4-1/2" 12.6#, L-80 Slotted LNR -13,057' 6-1/8" Pilot hole TD -11,581' ~ P&A'd with 17ppg Cement 11690' 4-1/2" BKR WLEG 11691' 4-1/2" TBG TAIL 11700' ELMD TT LOGGED 12/22/90 11948' TOP OF CEMENT 11963' TOP OF FISH (53.7' BHA ON 08/07/96) MILLOUT WINDOW - 11974' - 11980' GAS LIFT MANDRELS PBTD l~ 12024' 7" LNR, 29#, MN-80, .0371 bpf, ID = 6.184" I--I 12960' ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3336 3325 16 KGBR DOME BK 16 08/03/05 3 6254 5292 61 KGBR SO BK 20 08/03/05 2 8624 7018 22 KGBR DMY BK 0 1 10807 8528 55 KGBR DMY BK 0 DATE REV BY COMMENTS DATE REV BY COMMENTS 11/26/78 ORIGINAL COMPLETION 06/06/05 KWA Proposed Completion WP08 08!07/96 LAST WORKOVER 08/03/05 LWB/PJC GLV GO 02/19/01 SIS-MD FINAL 09/21 /01 RN/TP CORRECTIONS 02/05/03 ATD/TP DELETE WANER SAFETY NO 04/21/03 KBITCH DIAGRAM CORRECTIONS PRUDHOE BAY UNrf WELL: 06-06A PERMfT No: 1960820 API No: 50-029-20201-02 SEC 2, T10N, R14E, 3347.96' FEL & 785.03' FNL BP Exploration (Alaska) TREE = 4-1/8 5M FMC GEN 1 WELLHEAD= 11" S_M___FM_C_ ACTUATOR = K_B. ELEV = _65.8 BF. ELEV = 40.5-- KOP = _ 11,095 __ Max Angle = 100.6 Datum MD = Datum TVD = ~ ~ ~~ ~ ~~ ~ A ~ ~ ¢ COI~TSERQ~O Bill Isaacson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 O~7~ ~~+ ~+Vrti~7T 333 W. 7"' AVENUE, SUITE 100 Cor~IIssiO~ ~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 ~b j 71~ ~ ~ °"~~ ~ ( ; ~ ~ FRANK H. MURKOWSKI, GOVERNOR Re: Prudhoe Bay 06-06B BP Exploration (Alaska) Inc. Permit No: 205-098 Surface Location: 138' FSL, 1065' FEL, SEC. 02, T10N, R14E, UM Bottomhole Location: 2870' FNL, 42' FWL, SEC. 11, TlON, R14E, UM Dear Mr. Isaacson: Enclosed is the approved application for permit to redrill the above developmet well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty- four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petr e field inspector at (907) 659- 3607 (pager). ~~ J DATED this~day of June, 2005 cc: Department of Fish 8v Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work ^ Drill ®Rednll ^ Re-Entry 1 b. Current Well Class ^ Exploratory ®Development Oil ^ Muttiple Zone ^ Stratigraphic Test ^ Service ^Development Gas ^ Single Zone 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 2S100302630-277 ~ 11. Well Name and Number: PBU 06-06B l 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 13060 ~ TVp 8709 ~ 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 138' FSL 1065' FEL SEC 02 T10N R14E UM 7. Property Designation: ADL 028311 Pool , , . , , , Top of Productive Horizon: 3328' FNL, 3968' FEL, SEC. 11, T10N, R14E, UM 8. Land Use Permit: 13. Approximate Sp ate: Ju 2 005 Total Depth: ~"w'~- ~~ i< ~~ ~ ~' ~ 2870' FNL, 42'~SEC. 11', T10N, R14E, UM 9. Acres in Property: 2560 14. Distance to est Property: 17200' 4b. Location of Well (State Base Plane Coordinates): Surface: x-685928 ~ Y-5940735 ' Zone-ASP4 10. KB Elevation (Height above GL): 65.3 feet 15. Distance to Nearest Well Within Pool 13-17 is 109' away at 10406' 16. Deviated Wells: Kickoff Depth: 6500 ~ feet Maximum Hole Angle: 97 ~ de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3300 ~ Surface: 2430 ' 1 asing Program: Size Spec cations Setting Depth To Bottom Quantity of ement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 8-1 /2" 7" 26# L-80 BTC-M 11095' Surface .~7~' 8690' 13 sx, 216 sx,yer'sx, 122 sx, All sass 'G' ~ Z 6-1/8" 4-1/2" 12.6# L-80 IBT-M 2115' 10945' 8607' 13060 8709' Uncemented Slotted Liner rr~a - w~h 19. PRESENT WELL CONDITION SUMM ARY (To be completed for RedrilrAND Re-entry Operations) Total Depth MD (ft): 12024 Total Depth TVD (ft): 8716 Plugs (measured): 11948 Effective Depth MD (ft): 11948 Effective Depth TVD (ft): 8663 Junk (measured): None Casing Length Size Cement Volume MD TVD t n t r 80' 20" 300 sx Permafrost II A rox. 80' 80' 2719' 13-3/8" 985 sx Arcticset 2719' 2719' 11946' 9-5/8" 1000 sx Class 'G', 180 sx CS I, 105 sx AS 11946' 8662' P ti n 361' 7" 00 sx Class 'G' 11613' - 11974' 8409' - 8683' Perforation Depth MD (ft): None Perforation Depth TVD (ft): None 20. Attachments ®Filing Fee, $100 ^ BOP Sketch ® Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ken Allen, 564-4366 Printed Name ~; L t Ssaa es Title Senior Drilling Engineer Prepared By Name/Number: Si nature 'ti ~..._.__ Phone 564-5521 Date (o~Zp~uS Terrie Hubble, 564-4628 Commission Use Only Permit To Drill Number. ~L% ~ _~ C~ > API Number: 50-029-20201-02-00 Permit Approval Date: 3 '"""- See cover letter for other requirements Conditions of Approval: Samples Required ^ Yes No Mud Log Required ^ Yes '~No Hydr en Sulfide Measures f,~Yes ^ No Directional Survey Required ~fes ^ No Other: -C~S~" Zy ~ tp ~ S ~ O ~ S~"; - . k APPROVED BY ,--~, ~ THE COMMISSION A roved B : _ '~ ~ Date Form 10-401 Red 06/ 00 ~,~_~ - '~ ~ ~ ~. ~ubmit In/Duplicate WG,/~ • • Planned Well Summary Well 06-06B Well Sidetrack / Target Sag River Type _ horizontal Ob'ective AFE Number: PBD 4P2389 API Number: 50-029-20201-02 Surface Northin Eastin Offsets TRS Location 5,940,735.11 685,928.21 5141.6' FNL / 1065' FEL 10 N, 14 E, 2 Target Northin Eastin Offsets TRS Location 5,937,200 683,114 3328' FNL 13968' FEL 10 N, 14 E, 11 Sa Lateral , Bottom Northin Eastin Offsets TRS Location 5,937,624 681,750 2870 FNL / 42 ~l ~ ~ ~ E~~ 10 N, 14 E, Sa Lateral ! -° `G-~'4i~ Bottom Northin Eastin Offsets TRS Location 5,937,179 683,117 3349' FNL / 3966' FEL 10 N, 14 E, 11. Pilot Hole Planned KOP: 6,500' and Planned S ud: 06/25/05 Ri Nabors 2ES Planned Sa Lateral TD: 13,060' and Planned Sa Lateral TVD: 8,709' tvd Planned Pilot hole TD: 11,586' and Planned Pilot hole TVD: 8,965' tvd GL: 36.8' RTE: 65.3' Directional Program roved Well Ian: PB1=WP04/ WP08 Exit oint: 6,500' and / 5,411' sstvd Maximum Hole Inclination: -63° at 6,500' in the original well bore, ~97° at -11,271' in the planned 6-1/8 roduction horizontal. There are three wells that need to be risked base to pass the anti- collision scan in the intermediate hole. There is one well that needs to be Proximity Issues: risk based to the pass anti-collision scan in the production hole. Details are listed in the attached Anti-Collision re ort. Surve Pro ram: Standard MWD+IIFR+MS Nearest Well: Well 13-17, with center-to-center distance of -109' at 10,406' md. Nearest Pro rt Line 17,200' to the nearest PBU roe line. _~ ~i t ~Gr}~~ 06-06B Permit to Drill S -Version 1.021 Page 1 ~ • Logging Program Hole Section: Required Sensors /Service 8-112" intermediate: MWD DIR/GR/RES throw hoot the interval all in real-time mode. 6-1/8a Pilot hole: MWD Dir/GR/RES/DEN/NEU throw hoot the interval all in real-time mode. DIR/GR/RES/DEN (Azimuthal) throughout the interval all in real-time mode. Azimuthal Density can be picked up on the second run and a MAD performed 6-1/8" production: over the build section BEFORE drilling the lateral. MAD pass should be performed real-time by pulling out of the hole to avoid sidetracking with the um son. Two sam le catchers will be re wired at com an man call out. Cased Hole: None tanned O en Hole: None tanned Mud Program Fresh water LSND Hole Secti on / o eration: 8-1/2" Intermediate Hole Flowline Depth Density Funnel PV YP API FL Chlorides (ft) (ppg) Vis (cP) (Ib/100ft2) (ml/30min) pH (mg/I) MBT sec/ t -6,500 window 9.0 50 - 60 15 - 22 30 - 40 4.0 - 6.0 9.0 - 9.5 <600 <20 millin 69 740 9.0 -,~3.2 38 - 50 12 -18 22 - 28 4.0 - 6.0 9.0 - 9.5 <600 <20 9,740 - 11,095 1 ~° 38 - 50 14 - 22 22 - 28 3.0 - 5.0 9.0 - 9.5 <600 <20 Hole Section / o ration: 6-1/8" Pilot Hole Type Density (ppg) PV YP LSRV API FL pH FloPro SF 8.4 - 8.5 ~` 8 -15 22 - 28 > 25,000 4 - 6 9.0 - 9.5 Hole Section /operation: 6-1/8" Production Interval Type Density (ppg) PV YP LSRV API FL pH FloPro SF 8.4 - 8.5 ~ 8 -15 22 - 28 > 25,000 4 - 6 9.0 - 9.5 Casino /Tubing Program Hole CasinglTubing Wt. Grade Connection Length Top Bottom Size Size ~ ~ and / tvd and / tvd 8.5" 7" 26.0# L-80 BTC-M 4,745' 6,350' / 5,277' 11,095' / 8,690' 76ac'k 7" 26.0# L-80 TC-II 3,000' Surface 3,000' / 2,140' 7" Tie- Back 7" 26.0# L-80 BTC-M 3,350' 3,000' / 2,140' 6,350' / 5,277' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 2,115' 10,945'/ 8,607' 13,060'/ 8,709' Tobin 4-1/2" 12.6# 13Cr-80 VAM TOP 10,945' Surface 10,945'/ 8,607' 06-06B Permit to Drill S -Version 1.02i Page 2 • • Cementing Program Casin Strin 7", 26#, L-80, BTC-M Intermediate Liner Slurry Design Basis: Lead slurry: 3,595' of 8-1/2" x 7" annulus with 40% excess, plus 150' of 9-5/8" X 7" liner lap, plus 200' of 9-5/8" X 4" drill pipe annulus. Tail slur :1,000' of 8-1/2" x 7" annulus, lus 100' of 7", 26# shoe track Pre-Flush None Planned Fluids Se n /V l S acer 40bbls MudPUSH 1.5 que ce o ume: Lead Slur 133bb1s / 747 ft / sx Class `G', 12.0 t /sk. Tail Slur 32bb1 / 180 ft / sx Class `G', 15.8 .2 /sk. BHST: 190° ill i fl h BHCT: 123° Cement w be m xed on t y e Casin Strin 7", 26#, L-80, TC-II x BTC-M Tie-back Slurry Design Basis: Lead slurry: 2,350' of 9-5/8" x 7" annulus. Tail slur :1,000' of 9-5/8" x 7" annulus, lus 50' of 7", 26# shoe track. Pre-Flush None Planned Fluids Se uence /V l S acer 20bbls MudPUSH 9.6 . '>t. q o ume: Lead Slur 60bbls / 337 ft / x Class G , 13.5 ; 1 t /sk. Tail Slur 26bbls / 146 ft / 2 x Class `G', 15.8 ~ 1.~'ft /sk. BHST: 190° ill b i fl C d h BHCT: 123° ement w e m y xe on t e Casing /Formation Integrity Testing Test Test Point Test Type Test pressure 9-5/8" Casin to surface Bride lu to surface 30 min recorded 3,500 si surface 9-5/8" casin window 20' be and middle of window FIT 12.5 EMW 7" casin to surface Landin collar to surface 30 min recorded 3,500 si surface 7" Tie-back to surface Landin collar to surface 30 min recorded 3,500 si surface 7" shoe 20' be and middle of window FIT 9.8 EMW Well Control Well control equipment consisting of 5,OOOpsi working pressure pipe rams (2), blind/shear rams, and an annular preventer will be installed and is capable of handling maximum potential surface pressures. BOPE and drilling fluid system schematics are currently on file with the AOGCC. Well Interval: 8 1/2" intermediate interval Maximum antici ated BHP: 3, p i at 8,700' sstvd. Maximum surface ressure: 2 43 SI (based upon BHP and a full column of gas from TD @ 0.10 psi/ft) Calculated kick tolerance: finite with 12.5 pp EMW FIT Planned BOPE test pressure: 250psi low / 3,500psi high - 7 day test cycle until a window is milled in 7" casing. Once a window is milled a 14 day test cycle can commence. BOPE configuration for 7" Liner and 7" Tie-Back liner. Change out one set of rams to 7" pipe rams. ~ ~d L , ~3~0 ~% 06-06B Permit to Drill -Version 1.0 Page 3 • ~ Well Interval: 6-1/8" production liner section Maximum antici ated BHP: 3,300psi at 8,700' sstvd. Maximum surface ressure: 2,43 SI ased upon BHP and a full column of gas from TD C~ 0.10 psi/ft) Calculated kick tolerance: Infi it ith 8.8 EMW FIT FIT to 9.8 p EMW Planned ROPE test ressure: 2 psi low / 3,500 si hi h Planned com letion fluid: 8.4 seawater / 7.0 Diesel Planned BOPE test ressure: 250 si low / 3,500 si hi h -14 da test c cle. Disuosal Annular In'ection: No annular injection in this well. Cuttings Handling• Cuttings generated from drilling operations are to be hauled to the Grind and Inject station at DS-04. An metal cuttin s should be sent to the North Slo a Borou h. Fluid Handling: All drilling and completion fluids and other Class II wastes are to be hauled to DS-04 j for in ection. All Class I wastes are to be hauled to Pad 3 for dis osal. Geologic Prognosis Formation Planned MD ft TVDss ft Comments UGl -5310 Prop KOP @ in UGI 6500 -5346 WS2 7442 -5884 WSl 7720 -6119 CM3 8021 -6395 CM2 8549 -6888 CM 1 9204 -7491 THRZ 9839 -7923 BHRZ 10193 -8121 TJC 10441 -8260 TJB 10733 -8423 TJA 10940 -8539 TSGR 11094 -8625 3,300 PSI (Estimated) TSHA 11137 -8649 TSAD 11266 -8721 42SB 11502 -8853 TD Criteria TD Criteria (pilot TD will be picked by the town and rig site geo. Well should TD before reaching Zone hole : 3. TD Criteria (Sag Drill to TD of plan. Wellplan will not be extended due to the polygon boundaries being horizontal: hardlines. 06-066 Permit to Drill -Version 1.0 Page 4 • • Fault Prognosis Formation where Est. MD SSTVD Est. Throw Throw Uncertainty encounter the Fault Intersect Intersect Direction Fault #2 (THRZ/LCU/Kingak 10,200 uncertain Very small Down to S +/-100' MD The proposed 06-066 well may possibly cross the tip line of Fault 2 near the THRZ or LCU, going from downthrown to upthrown. This fault is dying out to the east and there should be very little if any offset at the point the well crosses it The proposed 06-06B well lies in a high risk province of the field for lost circulation at faults as documented by the WORD team and the risk of loss circulation events should be average. The nearest lost circulation event was about 900 feet to the S in 06-12A. This and other nearby events are detailed below: WELL # Rig/Coil 14-07 rig 14-07 rig 14-07 rig tripping 14-07 rig casing 14-14 rig 14-14 rig 14-30 rig cementing 06-04 rig casing 06-06 rig casing 06-12A rig casing 06-14A rig 06-14A rig 13-01 rig Barrels MD TVDSS Zone X LOC Y LOC Class Comment 247 10883 8714 ZONE 4 680414 5938993 A 791 11481 9145 ZONE 2 680816 5938895 A 10 i 1785 9369 Below BSAD 681015 5938842 C 100 11751 9344 Below BSAD 680993 5938848 C 5 7950 6142 Above SAG RIVER-LCU 679349 5938710 B 10 9612 7274 Above SAG RIVER-LCU 680540 5938469 B 35 10382 8661 Above SAG RIVER-LCU 6794 12 59354 75 C 200 8657 8334 Above SAG RIVER-LCU 685730 5939494 C 100 11945 8601 Above SAG RIVER-LCU 6838375934521 C 158 11365 9106 ZONE 2 683021 5936036 C 3i6 9496 8600 SAG RIVER 682937 5939255 A 1179 9975 8966 ZONE 2 682652 5939138 A 350 10055 9445 Below BSAD 685407 5934300 A Operations Summary Pre-Ria Work: 1. Rig up slickline. Drift 4-1/2" tubing through WLEG. Tag and record PBTD below WLEG. 2. Fluid pack the tubing and inner annulus. 3. P&A perfs in 7" liner from the top of the CTD fish (11,963') to 11,100' MD. RIH with coil to PBTD. Lay in 20 bbls of cement to 11,100' MD. Wash down to confirm TOC @ 11,100'. POH with coil. a. Cement Calculations: • 3-3/4" Cement hole = 11,963' - 11,948' or 15' (0.2 BBLS) • 7" liner = 11,948' - 11,691' or 257' (10.1 BBLS) • 4-1/2" tubing = 11,691' - 11,100' or 691' (9.1 BBLS) • Total cement volume of 19.4 BBLS 4. Rig up slickline, drift 4-1 /2" tubing. Tag TOC. 5. Chemical cut the 4-1/2", 12.6#, L-80 tubing at ~ 6,800' MD. 6. Pressure test T X IA to 3,500 psi for 30 minutes. Pressure test the OA to 2,000 psi for minutes. 7. Circulate the well to sea water through the Chemical cut. Freeze protect the IA and tubing with diesel to 2,200'. 06-06B Permit to Drill -Version 1.0 Page 5 • • 8. Bleed OA, IA & TBG to zero. Test the 9-5/8" pack-off to 3,500 psi and tubing hanger seals to 5,000 psi. Function all lock-down screws. Repair or replace as needed. 9. Bleed casing and annulus pressures to zero. Set a BPV in tubing hanger. Secure well. 10. Remove the well house. Level the pad. Please provide total well preparation cost on the handover form. Riq Operations: 1. MIRU Nabors 2ES 2. Pull BPV. Circulate out freeze protection and displace well to seawater. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. Pull TWC. 4. Pull 4-1/2" tubing from the pre-rig Chemical cut 6,800'. Spool up SSSV control lines. 5. RU a-line. Run Gauge Ring /Junk basket and Gamma Ray tool for 9-5/8", 47# casing with CCL to tubing stub ~ 6,800'. 6. RIH with 9-5/8" EZSV on a-line. Set EZSV at 6,520 to avoid cutting a casing collar during window milling operations. RD a-line. 7. Close rams and pressure test the 9-5/8" casing and bridge plug. If PT fails PU RTTS to find leak. If there is a leak a contingency plan will be sent to the rig. 8. 9-5/8" whipstock and bottom trip anchor with an 8-1/2" window milling assembly. RIH picking up 4" DP to EZSV. Orient and set the whipstock. Swap well over to 9.0 ppg milling fluid. Note: If MWD signals are too weak to obtain toolfaces, swap over to milling fluid before setting the whipstock. / " ' ' 9. 0 ~ ~ ~, 1 ~ ~ Mill a window in the 9-5/8 casing at ±6,500 MD plus 20 from mid window. Perform FIT to 11.9 ppg. POOH for Drilling BHA. Note: Verify that the mud weight is 9.0 ppg prior to cutting the wind w. U~ 10. ~~~iv MU the 8-1/2" drilling assembly with DIR/GR/RES/PWD and RIH. Kick off and drill 8-1/ in ermediate " `r interval to 7 casing point at the Top Sag River. Mud weight will be increased to 1. ppg before - drilling into the THRZ. 11. Ru a cement a 7" drilling liner throughout the 8-1/2" hole and back into the 9-5/8" casing 150' to 1. ,3 ' MD. Set hanger /liner top packer and displace cement with mud. POOH. 12. and run 7" T' ack liner to surface. Top 3,000' of 7" will have premium threads. Cement will be brought up to ,20 ' MD. Remainder of 9-5/8" by 7" annuys will be freeze protected to surface. 13. Perform a top ' n the conductor by 13-3/8" annulus. 14. MU 6-1/8" BHA with DIR/GR/RES/NEU/DEN and RIH to the 7" tie-back landing collar. ° 15. Pressure test wellbore to 3500 psi for 30 minutes. ~ 16. Drill tie-back cementing equipment and RIH to 7" drilling liner landing collar. 17. Pressure test wellbore to 3500 psi for 30 minutes. 18. Drill shoe track. Swap over to 8.4 ppg mud and drill 20' of new formation. Perform FIT to 10.0 ppg. 19. Drill the 6- "'pilot interval as per directional plan (holding inclination and azimuth) to an estimated TD of 1 ,52 md. Condition well bore-for a cement P&A of pilot hole. POOH racking back 4" DP and LD drilli ssembly. 20. MU stinger and RlH to TD of pilot hole. Set a balanced 17 ppg cement plug from TD to 50' inside 7" K / shoe. POOH and 3 stands and wash down so TOC is --5' inside of 7" shoe. POOH. 21. MU the 6-1/8" drilling assembly with DIR/GR/RES/ABI and RIH to TOC. 22. Drill the 6-1/8" production interval building to ~97°, targeting the Sag River formation. POOH. 23. MU 6-1/8" BHA with DIR/GR/RES/ABI/Azimuthal Density and drill ahead to an estimated TD of ~ 13,060' MD. 24. Run a 4-1/2" slotted liner throughout the 6-1/8" wellbore and back into the 7" drilling liner 150'. / 25. Release from liner, displace well to clean seawater. 26. Run the 4-1/2", 12.6#, 13Cr-80 completion tying into the 4-1/2" liner top. 27. Set packer and individually test the tubing to 3,500 psi and annulus to 3,500 psi for 30 minutes each. 28. Set and test TWC. 29. ND BOPE. NU and test the tree to 5,000 psi. ~ 30. Freeze protect the IA and Tubing to 2,200' and secure the well. 31. RDMO. Post-Riq Work: 1. Install wellhouse and flowlines. 2. MIRU slickline. Pull the ball and rod / RHC plug from `XN' nipple below the new production packer. 3. Install gas lift valves. 06-06B Permit to Drill -Version 1.0 Page 6 ~ • Job 1: Move In / Rig Up /Test BOPE Reference RP • "Drilling/Workover Close Proximity Surface and Subsurface Wells" SOP. • "Hydrogen Sulfide"SOP. • "ADW Rig Move" RF'. Issues and Potential Hazards - BOP test interval during this phase is 7 days. - No wells will require shut-in for the rig move onto 06-066. However, 06-05 is about 120' to the North and 06-07 is about 120' to the South of 06-20. 06-19 and 06-21 are the closest surface neighboring wells. Care should be taken while moving onto the well. Spotters should be employed at all times. - The 06-06B well bore will be secured with the following barriers: • Note on barriers during MIRU procedures: ^ Tubing -Tested Cement plug (P&A perfs), Kill weight fluid and a BPV. ^ IA -Tested Cement plug (P&A perfs), Kill weight fluid and the annular valve. ^ OA -Kill weight fluid, tested Annulus and annular valve. • Note on barriers during ND Tree / NU BOP Procedures ^ Tubing -Tested Cement plug (P&A perfs), Kill weight fluid and a TWC. ^ IA -Tested Cement plug (P&A perfs), Kill weight fluid and the annular valve. ^ OA -Kill weight fluid, tested Annulus and annular valve - Prior to pulling the tree, verify there is a static column of seawater to surface and that no pressure exists. Drill Site 06 will be considered as an H2S site. Standard Operating Procedures for H2S precautions ~ should be followed at all times. Recent H2S data from the pad is as follows: Well Name H2S Readin Date #1 Closest SHL with H2S Readin 06-07 10 m 03/29/05 #2 Closest SHL with H2S Readin 06-OS 10 m 03/20/05 #1 Closest BHL with H2S Readin 06-17 30 m 05/02/04 #2 Closest BHL with H2S Readin 13-01 90 m 05/04/05 Max Recorded H2S Readin on the Pad 06-13 250 m 01/09/04 Drill site 06 is a hi h level H2S dril l site. Use extra caution while workin . - Post Permit to Drill and Summary of Drilling Hazards in the dog house and camp prior to spud. 06-06B Permit to Drill -Version 1.0 Page 7 i • Job 2: De-complete Welt Reference RP • "De-completions" RP Issues and Potential Hazards - BOP test interval during this phase is 7 days. - Monitor the well to ensure the fluid column remains static prior to pulling the completion. - Note and record required PU weight to pull tubing from cut point (6,800'). - Have all wellhead and completion equipment NORM-tested, following retrieval. - The existing wellhead is a "FMC Gen I" design completed in 1978. It has 9-5/8" intermediate casing set on a mandrel hanger and packoff. The current completion is a 5-1/2" crossed over to 4- 1/2" just below the well head. Top threads of the hanger are listed as 5-3/4" RH ACME running threads. The bottom threads should be LTC-M. Have a spear on location as a contingency to pull the Hanger to the floor. - There is a 4-1/2" Otis HRQ SSSV Landing Nipple at 2203' with 2, ~/a" encapsulated control lines run to surface. The current tubing tally states there are 33 steel bands securing these control lines. - A 7" tie-back will be stung into the current 7" liner and brought back to surface. Cement will be brought up to 2,500'. The top 3,000' of 7" will be premium threads. The rest of the 7" tie-back will be the BTC-M connection. 06-066 Permit to Drill -Version 1.0 Page 8 • Job 3: Run Whip Stock Reference RP • "Whipstock SidetracK' RP. • "Leak-off and Formation Integrity Tests" SOP I ,1 Issues and Potential Hazards - BOP test interval during this phase is 7 days until the window is milled into formation. Once the window is milled the 14 day test cycle starts and continues until the rig moves off the well. - A 9-5/8" whip stock will be run and set in the existing 9-5/8" 47# liner. A 8-1/2" window will then be milled in the 9-5/8" 47# liner. - According to the volumes pumped, it is questionable whether we will have cement behind the 9- 5/8" casing at the sidetrack point. - The window will be cut in the existing 9-5/8" casing into the Ugnu formation. Ensure entire wellbore has been circulated to 9.0 ppg mud before milling commences. - Once milling is complete, circulate a minimum of 1-1/2 bottoms up and pump a "Super Sweep" pill to remove metal debris created from the milling process. Ditch magnets should be used throughout job. - Once the milling BHA is out of the hole the entire stack and flow lines should be flushed to remove metal debris that may have settled out in these areas. Ensure BOP equipment is operable. Job 4: Drill Intermediate Hole Reference RP • Standard Operating Procedure for Leak-off and Formation Integrity Tests • Prudhoe Bay Directional Guidelines • Lubricants for Torque and Drag Management. • "Shale Drilling- Kingak & HRZ" Issues and Potential Hazards - 06-066 is expected to cross one fault in the intermediate hole section. The approximate location of the fault is 10,200' and (+/- 100' laterally uncertainty) and has a very small estimated throw at the planned crossing depth. The throw of the fault grows to 100' at the TMLV. Lost circulation is considered a minimum risk. If losses/breathing is encountered, consult the Lost Circulation Decision Tree regarding LCM treatments and procedures and adjust drilling practices to reduce breathing phenomena. - A 7" tie-back will be stung into the new 7" liner and brought back to surface. Cement will be brought up to 2,500'. The top 3,000' of 7" will be premium threads. The rest of the 7" tie-back will be the BTC-M connection. - Differential sticking of drillpipe and casing could be a concern in the West Sak and Ugnu formations. To combat this, Mix II and/or G-Seal will be strung in the mud as these intervals are drilled to "block" the intervals as they are penetrated. This will prevent differential sticking, mud loss, and thick wall cake. 06-06B Permit to Drill -Version 1.0 Page 9 • • - KICK TOLERANCE: In the st case scenario of 8.0 ppg pore pressure at the top Sag River depth, gauge hole, a frac re gradient of 12.5 ppg at the surface casing shoe, 11.3 ppg mud in the hole, the kick tolerance i 26 bbls. - There are 3 wells that fail the "major risk close approach" scan in the intermediate hole interval. Details are in the attached Anti-Collision report. Phase 6: Run and Cement Intermediate Liner Hazards and Contingencies - Swab and surge pressure should be minimized with controlled liner running speeds and by breaking circulation slowly. Excessive swab /surge pressures could initiate HRZ /Kingak instability problems. - Differential Sticking is potentially a problem if lost circulation occurs or if the liner is left stationary across permeable formations. Proper casing centralization and keeping the liner moving will facilitate minimizing the potential for differential sticking. Reference RP • "Intermediate Casing and Cementing Guidelines" RP • "Freeze Protecting an Outer Annulus" RP • "Shale Drilling, Kingak and HRZ" RP Job 7: Drill 6" Production Hole Interval Reference RP • "Leak-off and Formation Integrity Tests" SOP • "Prudhoe Bay Directional Guidelines" RP • "Lubricants for Torque and Drag ManagemenP' RP Issues and Potential Hazards - The 06-066 wellbore does not cross any known faults. Lost circulation risk could be high if an unplanned /unmapped fault is crossed. A detailed list of faulting issues is listed on page 4 of this program. - Differential sticking is a concern. The 8.4 - 8.6 ppg mud will be 545 psi over balanced to the Sag River and Ivashak formations. Minimize the time the pipe is left stationary while in open hole (making connections, surveying, etc). - A pilot hole will be drilled into the Ivashak formation to test for future sidetrack opportunities. This pilot hole will be P&A'd with cement before sidetrack and drilling the Sag River horizontal well. - A liner running pill will be left in the open hole on the final trip out of the hole to run the slotted liner. 06-06B Permit to Drill -Version 1.0 Page 10 • • Job 9: Run 4-1/2" Production Liner Reference RP • "Modified Conventional Liner Cementing'' RP • Schlumberger Cement Program. Issues and Potential Hazards - The completion design is to run a 4-1/2", 12.6#, L-80 IBT-M slotted liner throughout the production interval. - Differential sticking is possible. The 8.4 - 8.6 ppg Flo-Pro will be 545 psi over balanced to the Ivishak formations. Minimize the time the pipe is left stationary while running the liner. - Ensure the liner top packer is set prior to POOH. Slack off with rotation to the maximum allowable down weight, as per Baker representative. - Sufficient 4-1/2" liner will be run to extend 150' above the bottom of the 7" liner shoe (est 10,945'). Job 12: Run 4-~h" 13Cr-80 Completion Reference RP • "Completion Design and Running' RP • "Handling and Running 13 Chrome" RP • "Casing and Tubing connections" RP Issues and Potential Hazards - Diesel will be used to freeze protect the well to 2200'. The diesel flash point is 100° F. Diesel vapor pressure is ~ 0.1 psia at 100° F. - The completion, as designed, will be to run a 4-1/2", 12.6#, 13Cr-80, VAM TOP production tubing string, stinging into the 4-1/2" production liner tieback sleeve. Take all the normal precautions while running the VAM TOP 13Cr-80 tubing: clean threads if contaminated, use a stabbing guide, single joint compensator, properly dope and hand-start each pin. Use Jet Lube Seal Guard thread compound and torque turn each connection. Tubing should arrive on location with the proper thread dope. Confirm type of thread compound prior to RIH. 06-066 Permit to Drill -Version 1.0 Page 11 • • Job 13: ND/NU/Release Rig Reference RP • "ADW Rig Move" RP. • "Freeze Protecting an Inner Annulus" RP. Issues and Potential Hazards - No wells will require shut-in for the rig move off 6-066. However, 06-05 is about 120' to the North and 06-07 is about 120' to the South of 06-20. 06-19 and 06-21 are the closest surface neighboring wells. Care should be taken while moving onto the well. Spotters should be employed at all times. - When moving from Drill Site 06 note the condition of the road over the Little Put River. In June of 2000 N-2ES did have some difficulties with a move over that area of the Road. Consider double matting when moving over the Little Put River. - Note on Barriers during the ND BOP / NU Tree procedures: ^ Tubing -Kill weight fluid on a RHC plug with ball & rod and a TWC. ^ IA -Kill weight fluid, tested annulus and annular valve. ~= ^ OA -Kill weight fluid, tested annulus and annular valve. - Note on Barriers during the RDMO procedures: ^ Tubing -Kill weight fluid on a RHC plug with ball & rod and a BPV. ^ lA -Kill weight fluid, tested annulus and annular valve. ^ OA -Kill weight fluid, tested annulus and annular valve. 06-06B Permit to Drill -Version 1.0 Page 12 TREE = FMC GEN 1 WELLHE4D = FMC ACTUATOR = AXELSON KB. ELEV = 60' BF. ELEV = KOP = 3100' Max Angle = 63 @ 6500' Datum MD = 12224' Datum TV D = 8800' SS ~ 06-06A Starting condition I I 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892 43' ~ 9-5/8" CSG, 53.3#, L-80, .0707 bpf, ID = 8.535" 2438' TOP OF 9-5/8" CSG 2438' 13-3/8" CSG, 72#, MN-80, ID = 12.347" i--I 271 Minimum ID = 3.80" @ 11680' 4-1 /2" OTIS XN NIP TOP OF 7" LNR ~~ 11613' SAFETY~ES: IA x OA COM M TO AL. AVOID PULLING ST #3 GLV. COULD NOT PULL ST #8 GLV. 43' 5-1/2" X 4-1/2" XO 2203' 4-1 /2" OTIS HRO SSSV NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2900 2900 3 MGFMHO RK 2 3750 3711 25 MC-FMHO RK 3 6457 5389 61 MGFMHO RK 4 8681 6497 54 MGFMHO RK 5 9499 6986 53 MGFMHO RK 6 9650 7076 53 MGFMHO RK 7 10467 7592 48 MC-FMHO RK 8 11236 8130 44 MGFMHO RK 9 11347 8211 43 MGFMHO RK 11564' 4-1/2" BKR GBH SEAL ASSY, ID = 3.875" (4' OF SEALS) 11567' 9-5/8" X 4-1/2" BKR DB PKR 11680' ~ 4-1 /2" OTIS XN NIP, ID = 3.725" MILLED OUT TO 3.80" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~~ 11691' 9-5/8" CSG, 47#, MN-80, ID = 8.681" ~-~ 11945' PERFORATION SUMMARY REF LOG: BHCS ON 04/04/76 ANGLE AT TOP PERF: 42 @ 11948' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/4" 0 11948 - 11963 S 08/07/96 ~ PBTD 7" LNR, 29#, MN-80, .0371 bpf, ID = 6.184" 12024' 12960' 11690' ~4-1/2" BKRWLEG 11691' 4-1/2" TBG TAIL l 11700' ELMD TT LOGGED 12/22/90 11948' -' TOP OF CEMENT 11963' TOP OF FISH (53.7' BHA ON 08/07/96) MILLOUT WINDOW - 11974' - 11980' DATE REV BY COMMENTS DATE REV BY COMMENTS 11/26/78 ORIGINAL COMPLETION 08/07/96 LAST WORKOVER 02/19/01 SIS-MD FINAL 09/21 /01 RN/TP CORRECTIONS 02/05/03 ATD/TP DELETE WAIVER SAFETY NOT 04/21/03 KB/TLH DIAGRAM CORRECTIONS PRUDHOE BAY UNff WELL: 06-O6A PERMrf No: 1960820 API No: 50-029-20201-01 SEC 2, T10N, R14E, 3347.96' FEL & 785.03' FNL BP Exploration (Alaska) TREE = FMC GEN 1 WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 60' BF. ELEV = KOP = 3100' Max Angle = 63 @ 6500' Datum MD = 12224' Datum TV D = 8800' SS 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892 43' 9-5/8" CSG, 53.3#, L-80, .0707 bpf, ID = 8.535" 2438' TOP OF 9-5/8" CSG- 2438' 13-3/8" CSG, 72#, MN-80, ID = 12.347" I---I 2719' Chemical cut -6,800` Top CMT P&A -11,100`. 11564' 4-1/2" BKR GBH SEAL ASSY, ID = 3.875" (4' OF SEALS) 11567' -~9-5/8" X 4-1/2" BKR DB PK~ TOP OF 7" LNR 11613' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" • 06-06A Pre-Rig I 11691' I 9-5/8" CSG, 47#, MN-80, ID = 8.681 " ~-~ 1 PERFORATION SUMMARY REF LOG: BHCS ON 04/04/76 ANGLE AT TOP PERF: 42 @ .11948' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/4" 0 11948 - 11963 S 08/07/96 PBTD 12024' 7" LNR, 29#, MN-80, .0371 bpf, ID = 6.184" 12960' I ~+ SAFETES: IA x OA COM M TO AL. AVOID PULLING #3 GLV. COULD NOT PULL ST #8 GLV. 43' 5-1/2" X 4-1/2" XO 2203' 4-1/2" OTIS HRO SSSV NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2900 2900 3 MGFMHO RK 2 3750 3711 25 MGFMHO RK 3 6457 5389 61 MGFMHO RK 4 8681 6497 54 MGFMHO RK 5 9499 6986 53 MGFMHO RK 6 9650 7076 53 MGFMHO RK 7 10467 7592 48 MGFMHO RK 8 11236 8130 44 MGFMHO RK 9 11347 8211 43 MGFMHO RK Minimum ID = 3.80" @ 11680' 4-1/2" OTIS XN NIP .:: 11680' 4-1 /2" OTIS XN NIP, ID = 3.725" MILLED OUT TO 3.80" ~. 11690' 4-112" BKR WLEG 11691' 4-1/2" TBG TAIL ~~ 11700' ELMD TT LOGGED 12/22/90 e 11948' TOP OF CEM~ 11963' TOP OF FISH (53.7' BHA ON 08/07/96) MILLOUT WINDOW - 11974' - 11980' DATE REV BY COMMENTS DATE REV BY COMMENTS 11/26/78 ORIGINAL COMPLETION 06/06/05 KWA Pre-Sidetrackwork 08/07/96 LAST WORKOVER 02/19/01 SIS-MD FINAL 09/21/01 RN/TP CORRECTIONS 02/05/03 ATD/TP DELETE WA IV ER SAFETY NOT 04/21!03 KB/TLH DIAGRAM CORRECTIONS PRUDHOE BAY UNff WELL: 06-06A PERMIT No: 1960820 API No: 50-029-20201-01 SEC 2, T10N, R14E, 3347.96' FEL & 785.03' FNL BP Exploration (Alaska) ' ~ 06-06B ~ ~ Proposed Completion HES 4-1 /2" X Nipple ID = 3.813" ~ 2,200` 9-5/8" CSG, 53.3#, L-80, .0707 bpf, ID = 8.535" 243$' TOP OF 9-5/8" CSG 2438' 13-3/8" CSG, 72#, MN-80, ID = 12.347" 2719' 4-1/2" TBG, 12.6#, 13Cr-80, Vam TOP Top of Window -'6,500` ~ 9-5/8" EZSV 6,520` 4-1/2" Tubing Stub 6,800` Top CMT P&A -11,100` 11564' 4-1/2" BKR GBH SEAL ASSY, ID = 3.875" (4' OF SEALS) 11567' 9-5/8" X 4-1/2" BKR DB PKR TOP OF 7" LNR 11613' 116$0' 4-1/2" OTIS XN NIP, ID = 3.725" MILLED OUT TO 3.80" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 11691' 9-5/8" CSG, 47#, MN-80, ID = 8.681 " (---( 11945' I'BTD 12024' 7" LNR, 29#, MN-80, .0371 bpf, ID = 6.184" 12960' TREE = FMC GEN 1 _2,200` TOC ~ DatumTVD= 7" Tie-Back 26#, L-80 TC-II --3,000` 7" Tie-Back Seal Assy 26#, L-80 BTC-M 6,353` 7" LNR Top 26#, L-80 BTC-M --6,350` 10,870` HES 4-1/2" X Nipple ID = 3.813" 10,890 BKR 7" x 4-1/2" BKR PKR •~~ 10,910` HES 4-1/2" X Nipple ID = 3.813" 10,930` HES 4-112" XN Nipple ID = 3.725" 10,948` 4-1/2" WLEG '~ `! _~ 7"x5" ZXP PKR -10,945` ~;~ ~ ~7" LNR 26#, L-80 BTC-M--11,095` ~, 4-1/2" 12.6#, L-80 ' /Solid LNR -11,135` ~< . • ~.tGA' 4-1/2" 12.6#, L-80 ° ~ i~~° Slotted LNR -13,060 • . (, - '"' ~~r''Pilot hole TD 11,586` ~ P&A'd with 17ppg Cement e-~ _ 11690' 4-1/2" BKR WLEG 11691' 4-1/2" TBG TAIL • .. ' 11700' ELMD TT LOGGED 12/22/90 ~ ' - 1194$' TOP OF CEMENT 11963' TOP OF FISH (53.7' BHA ON 08/07/96) MILLOUT WINDOW - 11974' - 11980' DATE REV BY COMMENTS DATE REV BY COMMENTS 11/26/78 ORIGINAL COMPLETION 06/06/05 KWA Proposed Completion WP08 08/07/96 LAST WORKOVER 02/19/01 SIS-MD FINAL 09/21/01 RN/TP CORRECTIONS 02/05/03 ATD/TP DELETE WANER SAFETY NO 04/21/03 KB/TLH DIAGRAM CORRC-CTIONS PRUDHOE BAY UNff WELL: 06-06A PERMfr No: 1960820 API No: 50-029-20201-01 SEC 2, T10N, R14E, 3347.96' FEl & 785.03' FNL BP Exploration (Alaska) WELLHEAD = FMC ACTUATOR = KB. ELEV = BF. ELEV = KOP = Max Angle = ('l>MI'nNY Ulil All ~~ nl' ArrXwX, c'+kulalnn Mcax„I: Minunwn l'unvWn• ~~~II~F" Irm~r lr~lem: 1.1('W~n tun Mcauwl'. 7 ear l1'Inwkr North Ilrrur Wrnv.~: I~:III~Iw•vl ~ l'mn~` Waminu Mnlwwl: hula ltuewl c C 0 a 7. t= ('u.mhmlc iN-1)Itcl:•raw.: Wcll ('nnn-lN.aN,. I'rw•Nnrtll Vrnx:al ll~'Ulltcl'.•relwx•: VAN ,-:X.<6c3u 1~•v'n,xl 1?~\l R~~li'rnw'e: ~kn-INr III IXIN.II INII:) McJSUie,l I):~th Nelerelw.: ?(.% ~ 2%.5 6<.lll ('akuwlkm Metlwwl: Mnnmm~('Imalun r~rNrrr~r CASING DETAILS ~i No. TVD MD Name 1 8690.30 11094.42 7" I ~ I i` - FORMA"FION TOP DETAILS No. TVDPath MDPath Formation 5949 30 a; rr; 7442 13 WS2 ' . . 2 6184.30 7720.00 WSI , ' 3 6460.30 8021.01 CM3 4 6953.30 8549.49 CM2 S 755630 9204.58 CM I - 6 7988.30 9839.03 THRZ 7 8186.30 10193.12 BHRL 8 8325.30 10441.69 TJC - 9 8488.30 10733.18 TJB 10 8604.30 10940.62 TJA II 8690.30 11094.42 TSGR - 12 8714.30 11137.33 TSHA 13 8786.30 11266.09 TSAD 14 8918.30 11502.15 42SB I -~ _,-. 1800 2400 30 00 \IIRVI:Y 1'RIx~RAM 1'Inn: G-IXrN I'R I W I'Iw l na-Illy I'lyt (.-(H,R I'R I I Ueph lin lkph"I'.. surv.r l'Iml T,,,'I ('r zleJ Hy Uignnl BuNUns.Clicm lher Uale: GiNRWS I,?INI.IN1 II<%~.~ 1'Lunrl: I.aN,R I'Iil WIXN V21 MWU-ItR ~AI~ ('h~YkcJ: Ual~•. xcvi~wcJ: U:nc: WIiI.I. Ulil All. Nnnc N.~ •1~:'-W N„nhw~ I~uumg Iniluk Iongnwlc 11u1 IN.IN, -I 1'!~`li I'_'J.W, ?`iJ1111<,In (xYtY'_N_I 1n"IJ'IJ!)(.N IJN'2y<?.412W IXi Size 7.000 TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Shape I OG-OGB TI PBI 8G90.3U -3450.00 -2492.90 5937224.88 683521.31 Poim SECTION DETAILS Sac MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target - I 6500.00 62.50 195.97 5411,71 -2290.81 -399.04 0.00 0.00 2016.48 ~ 2 6520.00 62.73 193.28 5420.91 -2307.99 -403.52 12.00 -85.00 2032.55 3 6870.00 62.60 173.56 5$g2,9Q -2616.16 -421.99 5.00 -95.00 2281.31 ', 4 8171.09 21.21 264.87 6000.53 -3284.51 -G12.G1 5.00 156.49 2917.06 S 8998.64 21.21 264.87 7372A2 -3311.29 -910.82 0.00 0.00 3128.33 6 9694.42 56.00 265.00 7907.43 -3348.84 -1336.67 5.00 0.19 3429.49 7 11094.42 SG.00 2GSA0 8690.30 -3450.00 -2492.90 0.00 0.00 4246.58 OG-06BTI PBI - 8 11585.66 56.00 2GSA0 8965.00 -3485.4') -2898.61 0.00 0.00 453318 - - - ,~_ ~ _ , ~_ .~- T- ,~ ' - i - t '~ I I I~ .. I ~~ I - - - _ - _. _ _ - . . I I ~; I I I ~ II - - ~ ~' -. - - - _ - - .. ~''., , - - - - - - I ~ I ~\. j - - - - - I ~ ~ _ .. . - -~ ~ ~~ i ~ ~ ~~ y ~ ~ - - ~ - -- T I I I I 11T 4200 4800 5400 Vertical Section at 219.75° [600ftiin] „• = tlj i j j ^ ~ r UMI'ANY DI~IAII ~ III' Am~x.u RI I I W N(1 INI- lKAi 111UN t u.ml IN'I I It I - W II t N - I%JH 1 m.• Nnnh ~ -,. M .'F t I' I- hl alxxl: Mnnnnxn c unaux~ Vxn 'I IIVUI%I t6x %. (..tl 4 IV % I 1 M In 1 NV II. x11.1 I-.mrr l,src,n ICI W'xA M.'~wn~l l><Ixl, %~•kn,x.. t(,,x .,%.~ I\.111 4an Mnlwxl: Ien l'yluxkx N„nll ('al.n lawm Metlxxl: Almnnun ('un:urue I~:m ,r ~urfa~c. Ilkpuul ~ t'a.mg Wxnnn x Mctlxxl: Itul.. IfanuJ SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target I 6500.00 62.50 195.97 5411.71 -2290.81 -399A4 0.00 OAO 2016.48 2 6520.00 62.73 193.28 5420.91 -2307.99 -403.92 12.00 -85.00 2032.55 3 6870.00 62.60 173.56 5582.90 -2G I G. I G -42 L99 9.00 -95.00 2281.31 4 8171.09 21.21 264.87 6600.53 -3284.51 -612.61 5.00 156.49 2917.06 5 8998.64 2 L21 264.87 7372.02 -3311.29 -910.82 0.00 0.00 3128.33 G 9694.42 56.00 265.00 7907.43 -3348.84 -1336.67 5.00 0.19 3429.49 7 11094.42 56.00 265.00 8690.30 -3450A0 -249290 0.00 0.00 4246.58 06-OGB'I'I PBI 8 11585.66 56.00 265.00 8965.00 -3485.49 -289R.G1 0.00 0.00 4533.28 -210 -240 -270 0 L 1= c -300 -330 -360 xn%VIiY I'%1xl%AM 1'la,,: r.-IMIr 1'111 WI'U41UG-I%>/I'la) G-IIGn I'VI I u,~rm hn u v 1 I + n.•) rm„ I..,a I 1 remcd ny ulElcd n~,ln~„ 17Iom u ~ uum: e'wzuns (,Ixl lul II. N.I Il~inuxl. I.I%N I'lil Wlvu \'21 MWV~II~It hid ('llew'kw•J Vall: WI:I.I. UI~IAII .v Na,x• ~ N'~x ,I:-W N,mhu,p I~Lymx I~nuxk I.nnplnwk 1Ln Ix.IN, -117~4i IL'J.'N, 51NI1i15.In G%c 12%.1 11Y 1~'4.'M.'.N lix".'J'v l.l.I_W Ix. TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Shape 06-OGBTI PBI 8690.30 -3450.00 -2492.90 5937224.88 68352L31 Point OG-OGB Poly 8690.30 -3564.49 -291720 5937100.00 683099.99 Polygon OG-OGB Fault I 8690.30 -3979.89 -4486.72 5936646.00 68194L29 Polygon 06-0GB Fault2 8690.30 -3963.75 -4532.54 5936661.00 681495.09 Polygon ! ~ , - FORMATION TOP DETAILS j -- - - . _. -. , 1 - - • - - -- - - No. TVDPath MDPath Formation I ETAILS CASING D TVD MD N N Si ~ t - , bil f I JI I / 100' ISW ~"I ~ ~ 1 4 1 ~ 1-1 - - - I 594').30 7442.13 WS2 o. ame ze 1 rt ~ : rvI , ¢ l 2 6184.30 77_0.00 WSI ~ 000 I 8690 30 11094 42 7" 7 1 ~ 3 6460.30 8021.01 CM3 ~ . . . - ~ ~ ~ I , - - - - - - - - - 4 6953.30 8949.49 CM2 ~ I ~ - I 5 755630 9204..8 C'MI - i . I ~ ~ ' i - -1 ~ ~~ ~ v 5 0' •~ ~ ~, ~54 ~O ~t - - i- _ G 7988.30 9839.03 THRL -- - - - _ ,_ - ff -~ - -- 7 8186.30 10193.12 BHRZ - _~...'- -- _ ~ -_ _ ~ - - - 8 8329.30 10441.69 TIC 9 8488 30 10733 18 TJB 'II- ~ -- .- - - - -_ i -- - - - - -- -- - - - - --- - - . . - 10 8604 30 10940 62 'i'JA i -- - - - - -- - . . II 8690.30 11094.42 TSGR I i .. _ -_ - _ 12 8714.30 11137.33 TSHA _ _ _ _ _ _ _ 13 8786.30 11266.0') TSAD 14 8918.30 11502.15 42S6 I ~ _ ~ __ --- -- ~~ -. -_ .- - -_ - -_ _.. ._ ._. __ _ -_ - - ~ ~ - - - - - t t- ,- ~- - •- - - ) ,-~ - - - -- - - - - - - - _ _ - -- --i- fi .. - - _ - r j I , ~ : 1 ~ -{ I :.. I I , - I - -- f r- - - - - - - - - - ... I .- t I I - - - - - - - - En a . 17~ t- ' M P GGQ O 3, T _ , ~ -- i ' I ~~ I - ~ ~ - - - - -'- 1 - ~ ~ I ' , ~ I S -D r 1100!: 8998 64' ~ I Pvt 3 ~2 12~ I' I Dl - I ~- 1 e tt(: 1985.66 MD. 8 96 . . 4 . ~ I :-_ - - - - - ~ - - - - ~ : Gn Dir ' 969 ~ 44_'IMb ~79 7 3 - -- l la OGB G T - - - - -- - ~ - - __ I -- - -- - - ~ i ~ ~, ~ _ -- _ 6- ~ - ~)6 g B ~ ~ W , P i d4 : ; _ -1 - - - - - 066- 1 P 1. I- - -. - - -- - -- - - - - -- --- -- -- -- .. - - _,__ - - -. -_. _. ..- -- -. 5 0 - _ - - - '7 , 0 , I I -- - I - - - - i 1 -- - - -- r . . , t - ~ - _ _ _. 0 0 - , - , -' r : - ~ g ~0~ - - - --~- - -- I - _ ... .-- - 1 t -T - - I -- - - - - - - . -. _ . - .. .. I i OG-OG{06-06).. -1VVU -G/VU -G4VV -11 VU -I ifVU -I>UU -ILUU -YUU -bUV -.f VU Westl-)/Easry+) [300fvin] Sperry-Sun BP Planning Report Company: BP Amoco Date: 6/8/2005 Time: 13:43:44 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 06-06, True North Site: PB DS O6 Vertical (TVD) Reference: 36.8 + 28.5 65.3 Well: 06-06 Section (VS) Reference: Well (O.OON,O.OOE,219.75Azi) Welipath: Plan 6-068 PB1 Survey Calculation Method: Minimum Curvature Db: Oracle Plan: 6-066 PB1 WP04 Date Composed: 5/24!2005 Version: 21 Principal: Yes Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate Syste m: Well Centre Sys Datum: Mean Sea Level Geomagnetic Modet: bggm2005 Site: PB DS 06 TR-10-14 UNITED STATES :North Slope Site Position: Northing: 5941880.59 ft Latitude: 70 14 46.529 N From: Map Easting: 684674.88 ft Longitude: 148 30 29.224 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.40 deg Well: 06-06 Slot Name: 06 06-06 Well Position: +N/-S -1175.93 ft Northing: 5940735.10 ft Latitude: 70 14 34.962 N +E/-W 1224.96 ft Easting : 685928.21 ft Longitude: 148 29 53.612 W Position Uncertainty: 0.00 ft Casing Points MD TV'D Diameter Hole Size `Name ft ft in in 11094.42 8690.30 7.000 8.500 7" Formations NID TVD Formations Lithology I)ip Augle Dip Direction ft ft deg deg 0.00 UG3 0.00 0.00 0.00 UG1 0.00 0.00 7442.13 5949.30 WS2 0.00 0.00 7720.00 6184.30 WS1 0.00 0.00 8021.01 6460.30 CM3 0.00 0.00 8549.49 6953.30 CM2 0.00 0.00 9204.58 7556.30 CM1 0.00 0.00 9839.03 7988.30 THRZ 0.00 0.00 10193.12 8186.30 BHRZ 0.00 0.00 10441.69 8325.30 TJC 0.00 0.00 10733.18 8488.30 TJB 0.00 0.00 10940.62 8604.30 TJA 0.00 0.00 11094.42 8690.30 TSGR 0.00 0.00 11137.33 8714.30 TSHA 0.00 0.00 11266.09 8786.30 TSAD 0.00 0.00 11502.15 8918.30 42SB 0.00 0.00 0.00 TCGL 0.00 0.00 Targets Map Map <~_ Latitude ---~ <- Longitude -> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. 1?ir. ft ft ft ft ft 06-06B T1 PB1 8690.30 -3450.00 -2492.90 5937224.88 683521.31 70 14 1.027 N 148 31 6.053 W -Plan hit target 06-066 Poly 8690.30 -3564.45 -2917.20 5937100.00 683099.99 70 13 59.900 N 148 31 18.381 W -Polygon 1 8690.30 -3564.45 -2917.20 5937100.00 683099.99 70 13 59.900 N 148 31 18.381 W -Polygon 2 8690.30 -3647.16 -3619.49 5937000.00 682399.99 70 13 59.084 N 148 31 38.788 W -Polygon 3 8690.30 -3534.85 -4116.91 5937100.00 681899.99 70 14 0.186 N 148 31 53.244 W -Polygon 4 8690.30 -3382.42 -4213.18 5937250.00 681799.99 70 14 1.685 N 148 31 56.044 W -Polygon 5 8690.30 -2928.58 -4362.04 5937700.00 681639.99 70 14 6.147 N 148 32 0.377 W -Polygon 6 8690.30 -2931.79 -4232.07 5937700.00 681769.99 70 14 6.116 N 148 31 56.600 W -Polygon 7 8690.30 -3086.19 -4055.82 5937550.00 681949.99 70 14 4.599 N 148 31 51.476 W Sperry-Sun BP Planning Report Company: BP Amoco Date: 6/8/2005 Time: 13:43:44 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Re ference: Well: 06-06, True North Site: PB DS 06 Vertical (TVD) Refe rence: 36.8 + 28.5 65.3 We{l: 06-06 Section (VS) Reference: Well (O.OON,O.OOE,219.75Azi) W@Ilpath: P{an 6-066 P61 Survey Calculation Method: Minimum Curvature Db: Oracle Targets Map Map <-- Latitude -a <__ Longitude -> Name Description 'CVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft -Polygon 8 8690.30 -3263.29 -2959.78 5937400.00 683049.99 70 14 2.862 N 148 31 19.622 W -Polygon 9 8690.30 -3291.16 -1830.06 5937400.00 684179.99 70 14 2.591 N 148 30 46.793 W -Polygon 10 8690.30 -3611.09 -1837.95 5937080.00 684179.99 70 13 59.445 N 148 30 47.020 W -Polygon 11 8690.30 -3675.03 -2489.77 5937000.00 683529.99 70 13 58.814 N 148 31 5.960 W -Plan out by 439.46 at 8690.30 -3450.00 -2492.90 5937224.88 683521.31 70 14 1.027 N 148 31 6.053 W 06-066 Fault 1 8690.30 -3979.89 -4486.72 5936646.00 681541.29 70 13 55.807 N 148 32 3.982 W -Polygon 1 8690.30 -3979.89 -4486.72 5936646.00 681541.29 70 13 55.807 N 148 32 3.982 W -Polygon 2 8690.30 -3842.67. -4128.70 5936792.00 681895.79 70 13 57.158 N 148 31 53.582 W -Polygon 3 8690.30 -3953.10 -3707.47 5936692.00 682319.59 70 13 56.075 N 148 31 41.340 W -Polygon 4 8690.30 -3928.98 -3144.07 5936730.00 682882.19 70 13 56.314 N 148 31 24.970 W -Polygon 5 8690.30 -3887.94 -2942.59 5936776.00 683082.59 70 13 56.719 N 148 31 19.116 W -Polygon 6 8690.30 -3989.20 -1919.71 5936700.00 684107.59 70 13 55.726 N 148 30 49.393 W -Polygon 7 8690.30 -3887.94 -2942.59 5936776.00 683082.59 70 13 56.719 N 148 31 19.116 W -Polygon 8 8690.30 -3928.98 -3144.07 5936730.00 682882.19 70 13 56.314 N 148 31 24.970 W -Polygon 9 8690.30 -3953.10 -3707.47 5936692.00 682319.59 70 13 56.075 N 148 31 41.340 W -Polygon 10 8690.30 -3842.67 -4128.70 5936792.00 681895.79 70 13 57.158 N 148 31 53.582 W -Plan out by 2063.03 at 8690.30 -3450.00 -2492.90 5937224.88 683521.31 70 14 1.027 N 148 31 6.053 W 06-066 Fault 2 8690.30 -3963.75 -4532.54 5936661.00 681495.09 70 13 55.965 N 148 32 5.314 W -Polygon 1 8690.30 -3963.75 -4532.54 5936661.00 681495.09 70 13 55.965 N 148 32 5.314 W -Polygon 2 8690.30 -3710.57 -4495.48 5936915.00 681525.89 70 13 58.456 N 148 32 4.242 W -Polygon 3 8690.30 -2935.58 -4646.02 5937686.00 681356.29 70 14 6.077 N 148 32 8.630 W -Polygon 4 8690.30 -2085.14 -5056.69 5938526.00 680924.79 70 14 14.438 N 148 32 20.581 W -Polygon 5 8690.30 -2935.58 -4646.02 5937686.00 681356.29 70 14 6.077 N 148 32 8.630 W -Polygon 6 8690.30 -3710.57 -4495.48 5936915.00 681525.89 70 13 58.456 N 148 32 4.242 W -Plan out by 2103.34 at 8690.30 -3450.00 -2492.90 5937224.88 683521.31 70 14 1.027 N 148 31 6.053 W Plan Section Information MD loci Azim TVD +N/-S +E/-W' DLS Build Turn TFO Target ft deg. deg ft ft ft deg/100ft deg/100ft deg/100ft deg 6500.00 62.50 195.97 5411.71 -2290.81 -399.04 0.00 0.00 0.00 0.00 6520.00 62.73 193.28 5420.91 -2307.99 -403.52 12.00 1 .18 -13.45 -85.00 6870.00 62.60 173.56 5582.90 -2616.16 -421.99 5.00 -0 .04 -5.63 -95.00 8171.09 21.21 264.87 6600.53 -3284.51 -612.61 5.00 -3 .18 7.02 156.49 8998.64 21.21 264.87 7372.02 -3311.29 -910.82 0.00 0 .00 0.00 0.00 9694.42 56.00 265.00 7907.43 -3348.84 -1336.67 5.00 5 .00 0.02 0.19 11094.42 56.00 265.00 8690.30 -3450.00 -2492.90 0.00 0 .00 0.00 0.00 06-066 T1 P61 11585.66 56.00 265.00 8965.00 -3485.49 -2898.61 0.00 0 .00 0.00 0.00 Survey MD Incl Azim TVD Sys TVD N/S E/W DLS !4IapN MapE Tool/Comme t ft deg deg ft ft ft ft'; ,deg/100ft ft ft 6500.00 62.50 195.97 5411.71 5346.41 -2290.81 -399.04 0.00 5938435.29 685585.82 Start Dir 12/10 6520.00 62.73 193.28 5420.91 5355.61 -2307.99 -403.52 12.00 5938418.00 685581.76 Start Dir 5/100 6600.00 62.45 188.79 5457.75 5392.45 -2377.67 -417.12 5.00 5938348.01 685569.89 MWD+iFR+MS 6700.00 62.31 183.15 5504.14 5438.84 -2465.75 -426.33 5.00 5938259.74 685562.85 MWD+IFR+MS 6800.00 62.40 177.50 5550.56 5485.26 -2554.28 -426.83 5.00 5938171.23 685564.54 MWD+IFR+MS 6870.00 62.60 173.56 5582.90 5517.60 -2616.16 -421.99 5.00 5938109.49 685570.90 MWD+IFR+MS 6900.00 61.22 174.25 5597.02 5531.72 -2642.48 -419.18 5.00 5938083.25 685574.36 MWD+IFR+MS 7000.00 56.67 176.66 5648.60 5583.30 -2727.84 -412.35 5.00 5937998.09 685583.29 MWD+IFR+MS 7100.00 52.17 179.34 5706.78 5641.48 -2809.09 -409.47 5.00 5937916.94 685588.18 MWD+IFR+MS 7200.00 47.74 182.37 5771.11 5705.81 -2885.60 -410.54 5.00 5937840.43 685588.99 MWD+IFR+MS 7300.00 43.40 185.85 5841.11 5775.81 -2956.79 -415.58 5.00 5937769.14 685585.71 MWD+IFR+MS 7400.00 39.18 189.93 5916.24 5850.94 -3022.12 -424.53 5.00 5937703.61 685578.37 MWD+IFR+MS 7442.13 37.45 191.87 5949.30 5884.00 -3047.77 -429.46 5.00 5937677.85 685574.08 WS2 7500.00 35.14 194.80 5995.94 5930.64 -3081.10 -437.34 5.00 5937644.34 685567.03 MWD+IFR+MS 7600.00 31.33 200.72 6079.59 6014.29 -3133.27 -453.89 5.00 5937591.78 685551.76 MWD+IFR+MS 7700.00 27.85 208.02 6166.57 6101.27 -3178.23 -474.08 5.00 5937546.34 685532.70 MWD+IFR+MS 7720.00 27.21 209.68 6184.30 6119.00 -3186.33 -478.54 5.00 5937538.13 685528.44 WS1 Sperry-Sun BP Planning Report Company: BP Amoco Date: 6/8/2005 Time: 13:43:44 Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 06-06, True North Site: PB DS 06 Vertic al (TVD) Reference: 36.8 + 28.5 65.3 Well: 06-06 Sectio n (VS) Reference: Well (O.OON,O .OOE,219.75Azi) Wellpath: Plan 6-066 PB1 .Survey Calculatio n Method: Minimum Curvature Db: Oracle Survey MD lncl Azim TVD Sys TVD N/S E/W DLS lYlapN MapE ToollComme t ft ,.deg..,. deg ft ft ft ft deg/100ft ' ft ft 7800.00 24.86 217.06 6256.20 6190.90 -3215.65 -497.73 5.00 5937508.35 685509.97 MWD+IFR+MS 7900.00 22.54 228.10 6347.80 6282.50 -3245.24 -524.69 5.00 5937478.10 685483.76 MWD+IFR+MS 8000.00 21.11 241.02 6440.69 6375.39 -3266.78 -554.72 5.00 5937455.83 685454.26 MWD+IFR+MS 8021.01 20.94 243.92 6460.30 6395.00 -3270.27 -561.41 5.00 5937452.18 685447.67 CM3 8100.00 20.76 255.01 6534.14 6468.84 -3280.10 -587.62 5.00 5937441.71 685421.70 MWD+IFR+MS 8171.09 21.21 264.87 6600.53 6535.23 -3284.51 -612.61 5.00 5937436.68 685396.83 End Dir :8171 8200.00 21.21 264.87 6627.49 6562.19 -3285.44 -623.03 0.00 5937435.49 685386.44 MWD+IFR+MS 8300.00 21.21 264.87 6720.71 6655.41 -3288.68 -659.07 0.00 5937431.37 685350.50 MWD+IFR+MS 8400.00 21.21 264.87 6813.94 6748.64 -3291.91 -695.10 0.00 5937427.24 685314.56 MWD+IFR+MS 8500.00 21.21 264.87 6907.16 6841.86 -3295.15 -731.14 0.00 5937423.12 685278.61 MWD+IFR+MS 8549.49 21.21 264.87 6953.30 6888.00 -3296.75 -748.97 0.00 5937421.08 685260.83 CM2 8600.00 21.21 264.87 7000.39 6935.09 -3298.39 -767.17 0.00 5937419.00 685242.67 MWD+IFR+MS 8700.00 21.21 264.87 7093.62 7028.32 -3301.62 -803.21 0.00 5937414.87 685206.73 MWD+IFR+MS 8800.00 21.21 264.87 7186.84 7121.54 -3304.86 -839.24 0.00 5937410.75 685170.79 MWD+IFR+MS 8900.00 21.21 264.87 7280.07 7214.77 -3308.09 -875.28 0.00 5937406.63 685134.84 MWD+IFR+MS 8998.64 21.21 264.87 7372.02 7306.72 -3311.29 -910.82 0.00 5937402.56 685099.39 Start Dir 5/100 9000.00 21.28 264.87 7373.29 7307.99 -3311.33 -911.32 5.00 5937402.50 685098.90 MWD+IFR+MS 9100.00 26.28 264.91 7464.77 7399.47 -3314.92 -951.46 5.00 5937397.92 685058.85 MWD+IFR+MS 9200.00 31.28 264.93 7552.39 7487.09 -3319.18 -999.40 5.00 5937392.48 685011.04 MWD+IFR+MS 9204.58 31.51 264.93 7556.30 7491.00 -3319.39 -1001.78 5.00 5937392.21 685008.67 CM1 9300.00 36.28 264.95 7635.48 7570.18 -3324.08 -1054.77 5.00 5937386.22 684955.81 MWD+IFR+MS 9400.00 41.28 264.97 7713.42 7648.12 -3329.58 -1117.14 5.00 5937379.18 684893.60 MWD+IFR+MS 9500.00 46.28 264.98 7785.59 7720.29 -3335.64 -1186.04 5.00 5937371.43 684824.88 MWD+IFR+MS 9600.00 51.28 264.99 7851.47 7786.17 -3342.21 -1260.95 5.00 5937363.01 684750.16 MWD+IFR+MS 9694.42 56.00 265.00 7907.43 7842.13 -3348.84 -1336.67 5.00 5937354.51 684674.63 End Dir :9694 9700.00 56.00 265.00 7910.55 7845.25 -3349.24 -1341.28 0.00 5937354.00 684670.03 MWD+IFR+MS 9800.00 56.00 265.00 7966.47 7901.17 -3356.47 -1423.87 0.00 5937344.74 684587.65 MWD+IFR+MS 9839.03 56.00 265.00 7988.30 7923.00 -3359.29 -1456.11 0.00 5937341.12 684555.49 THRZ 9900.00 56.00 265.00 8022.39 7957,09 -3363.70 -1506.46 0.00 5937335.48 684505.27 MWD+IFR+MS 10000.00 56.00 265.00 8078.31 8013.01 -3370.92 -1589.04 0.00 5937326.22 684422.89 MWD+IFR+MS 10100.00 56.00 265.00 8134.23 8068.93 -3378.15 -1671.63 0.00 5937316.96 684340.51 MWD+IFR+MS 10193.12 56.00 265.00 8186.30 8121.00 -3384.87 -1748.54 0.00 5937308.34 684263.80 BHRZ 10200.00 56.00 265.00 8190.15 8124.85 -3385.37 -1754.22 0.00 5937307.70 684258.13 MWD+IFR+MS 10300.00 56.00 265.00 8246.07 8180.77 -3392.60 -1836.81 0.00 5937298.44 684175.75 MWD+IFR+MS 10400.00 56.00 265.00 8301.99 8236.69 -3399.82 -1919.40 0.00 5937289.18 684093.37 MWD+IFR+MS 10441.69 56.00 265.00 8325.30 8260.00 -3402.84 -1953.83 0.00 5937285.32 684059.02 TJC 10500.00 56.00 265.00 8357.91 8292.61 -3407.05 -2001.99 0.00 5937279.92 684010.99 MWD+IFR+MS 10600.00 56.00 265.00 8413.83 8348.53 -3414.27 -2084.57 0.00 5937270.66 683928.61 MWD+IFR+MS 10700.00 56.00 265.00 8469.75 8404.45 -3421.50 -2167.16 0.00 5937261.40 683846.23 MWD+IFR+MS 10733.18 56.00 265.00 8488.30 8423.00 -3423.90 -2194.57 0.00 5937258.33 683818.89 TJB 10800.00 56.00 265.00 8525.66 8460.36 -3428.73 -2249.75 0.00 5937252.14 683763.85 MWD+IFR+MS 10900.00 56.00 265.00 8581.58 8516.28 -3435.95 -2332.34 0.00 5937242.88 683681.47 MWD+IFR+MS 10940.62 56.00 265.00 8604.30 8539.00 -3438.89 -2365.89 0.00 5937239.12 683648.00 TJA 11000.00 56.00 265.00 8637.50 8572.20 -3443.18 -2414.93 0.00 5937233.62 683599.09 MWD+IFR+MS 11094.42 56.00 265.00 8690.30 8625.00 -3450.00 -2492.90 0.00 5937224.88 683521.31 06-06B T1 P61 11100.00 56.00 265.00 8693.42 8628.12 -3450.40 -2497.52 0.00 5937224.36 683516.71 MWD+IFR+MS 11137.33 56.00 265.00 8714.30 8649.00 -3453.10 -2528.35 0.00 5937220.90 .683485.95 TSHA 11200.00 56.00 265.00 8749.34 8684.04 -3457.63 -2580.10 0.00 5937215.10 683434.33 MWD+IFR+MS 11266.09 56.00 265.00 8786.30 8721.00 -3462.40 -2634.69 0.00 5937208.98 683379.88 TSAD 11300.00 56.00 265.00 8805.26 8739.96 -3464.85 -2662.69 0.00 5937205.84 683351.95 MWD+IFR+MS 11400.00 56.00 265.00 8861.18 8795.88 -3472.08 -2745.28 0.00 5937196.58 683269.57 MWD+IFR+MS 11500.00 56.00 265.00 8917.10 8851.80 -3479.30 -2827.87 0.00 5937187.32 683187.19 MWD+IFR+MS 11502.15 56.00 265.00 8918.30 8853.00 -3479.46 -2829.64 0.00 5937187.12 683185.42 42S6 Sperry-Sun BP Planning Report Company: BP AmoCO Date: 6/8/2005 Time: 13:43:44 Page: 4 Field: Pnidhoe Bay Co-ordinate(NE) Reference: Well: 06-06, True North Site: PB DS 06 Vertical (TVD) Reference: 36.8 + 28.5 65.3 Weli: 06-06 Section (VS) Reference: Well (O.OON,O.OOE,219.75Azi) WeRpath: Plan 6-06B P61 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Inc1 .4zim TVD Sys TVD N/S E/W DLS MapN MapE Tool/Comme t ft deg deg ft ft ft ft deg7100ft ft ft 11585.00 56.00 265.00 8964.63 8899.33 -3485.45 -2898.07 0.00 5937179.45 683117.17 Total Depth : 1 11585.66 56.00 265.00 8965.00 8899.70 -3485.49 -2898.61 0.00 5937179.39 683116.62 MWD+IFR+MS ('/)MI'ANY nl~l All ~ 1(lil'I~.xI:N('I: INI~IIKMAI'IUN %IIKVI'.Y I'xl xiKAM I'Iw1. lK+-IIGn wpOY IIIG-116/l'IN1 (+(1(~lil I1I' Anxwu ~I~ tukulrtxm Mnlxxl hlrmuuuul unuauu t'..+ 1 - IN I.11(I W II t 1x 1 . I nr.~ NrrnL V n'IIIV n)xl 1(% ..M 1..111 IV IK I ~ I x11 ININ INI+:1 nupb I-m Ikpn I' 1 y~l'lan 111xH 1N) 13110.3'! IL1na1:1MwGli xp)N V51 I'rnrl ('rua d n). I>iE MWU. I+KhI ~ ilal nu,ul~.x l'liun Il n 1c: Gltl/21105 I:mrt.l'.~sxvn Il('W%A t n hl lk l: frr-t' k lu K W hlusunJ U.ptll Kclu.we: 3(.%,2x5 45.3u ' - . llx~.keJ'. Dale. ' u e n y u v n I~.ma lurWu: r:IhplicJ'<';uurx ( nkulalxul M.vluxt: hllnrnnm (lnauva Kevle.~cJ: hate. W'amu7t McJxul: Kuk> li.sal - FORMATION TOP DETAILS WI:1 I. nl~.l All.1 CASING DETAILS N:u1x• 'N'1 ~G'-W N.mbuR: I~swug ImvWA Lrmpnuk Sb1 No. TVDPath MDPaIh Formation No. TVD MD Natne Size a"ir, - I ns v3 1221'M, :Hm35.w (x5'rx._I io-1~'11 •Nr:N WM`^_y9.612W 1M 8690.30 11094.42 TSGR I 8690.30 11094.42 7" 7.000 TARGET DETAILS 2 8714.30 11140.17 TSHA 2 8708.30 13059.00 41/2" 4.500 Name TVD +N/-S +E/-W Northing Easting Shape OG-OGB TI PBI 8690.30 -3450A0 -2492.90 5937224.88 683521.31 Point - OG-OGB T3 wpOG 8706.30 -3497.51 -3602.80 5)37150.00 682412.99 Poim 06-OGB T2 wp06 8708.30 -3464.82 -2)00.73 5937200.00 68311399 Poim - OG-OGB T9 wpOG 8708.30 -3007.27 -4253.94 5937624.00 681749.99 Poim I SECTION DETAILS ~ ~ Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target ~ I 11094 AO 56.00 265.00 SG 90.07 -3449.97 -2492.56 O.OU 0.00 4026.85 '~ 2 11104.00 56.00 268.00 8695.66 -3450.69 -2500.82 0.00 0.00 4034.01 ~ ~ ~ ~ 3 1 1 124.00 58.79 265.29 8706.44 -3452.12 -2517.61 14.00 5.00 4048.54 ' ~ 4 11270.84 96.83 268.7 1 8736.89 -3459.18 -2658.32 26.00 5.51 4167.52 I ~,~ I 5 6 11487.01 IISIS,pI 96.83 95.00 268.71 8711.18 -3464.02 -2872.90 0.00 268.00 8708.30 -3464.82 -2900.73 7.00 0.00 4345.53 -158.86 4368.72 UG-066 T2 wpOG ~ ! 7 11601.76 89.84 264.80 8704.64 -3470.26 -2987.19 7.00 -148.18 4442.46 ~ ~ I t 8 12002.73 89.84 264.80 8705.80 -3506.58 -3386.52 0.00 0.00 4789.50 y / 9 12219.84 89.90 280.0 0 8706.30 -3497.51 -3602.80 7.00 89.77 4960.87 OG-OGBT3wp0G / -- IO 12646.05 89.92 309.8 2 8707.00 -3320A0 -3985.00 7.00 89.99 5170.50 ~' " ~ ~~ 11 12816.65 89.80 321.7 7 8707.43 -31')7.92 -4103.73 7.00 90.59 5196.98 *. / i ) 12 13059.37 89.80 321.7 7 8708.30 -3007?7 -4253.94 0.00 0.00 5209.58 06-068 T4 wp06 ~ i ; ~ j ~ , / i ~ ~ ~ ~~ ~ ~ ~ - /~ ~ ~ w 8400 1 ..- - - - - - -_1. - - -- I. . _. _._ _ . __ ~ - - ~ ~ ~ ;. ~ ' -_ - - _. - ~ - - . _ ~ . _ I ~ I -- r ,-- - ! - -- - - - -- - - - - - - - - -- ~- - I ? ~ -^-- art M Ik 10 ~1 M D' B1 , 95 I ~ ~ ~ ~ ~_. .. . i , _ _ ~ ~ -- I ; I ' ~ ' f ~ J 1 -- _~ - ' - - -~ - ~ -- . .. Sta ff U tr 7'--10 0 : I 7 $-MD B 1~ 03 ' I V - ! -- -- t - - 10 0 : III 124 M U. 87 06.4 4'7V ~ 1 i ~ 1 I , ~ _ - ~ - ~ _ _ I r T ~ - End D r 7 I I I R70 84 M D 9 ~~ ~ ~ 1 _ ~ .-- ~ j - - ' - - ' - i - , _- - I 1 T ~ -. ~ .. _.'_ _ _ - 8600 t - ; 4 it ~ /I 114$ -.O' D -87 1 I I S - _ _ .. T .__ - - _ n _ .1 t .G ' M D. t87 ~D7 ~ z ~ - I - _ - - - - - -- ' o i ...~. .- ~ I !4'~L I 1 G' ~ Tc ~ul D tl OR9J 7 M~~ 0 3 T L i ~ - I __ _ ~ . n r ~ _.... ~ - - - - ,~- - ~ _ _ rt ~ - ~ ~ ~ --= - L --. n . ~ .-.- c a _ ~ ~ 09 -0G fl~ 4' PP G O I --{~ ' 1 - - -- ~ _ ~~ _ ' 7" I ~ ~ II LsO ~ - - 2 0 ~ 1 Sa~ O 13 _' Pl an ¢-O GB i ~ - ~ -- ~ , / I ~ _, ~ ' Q fl ~ s ~ OG`'065 ~ ~ SHAt JJ __ . _ II SF{ A - - -- _ ~ - - 1 - ~ W ~ ° ;- F 8800- I ~ ~ I I 1 - - - 4 /2 __ - i - . ., L..- - - - --~ I I -_~ -- - I - -- - . ~ - - - - -: - _ - I . - ~ , -~- __ _. t _ G-~G (Plan G-OGB ~'BI) 1 , OG-OG WOG 3800 4000 4200 4400 4000 4800 5000 5200 5400 5600 Vertical Section at 234.74° [200ft/in] ~A~ jD() t't)MI'ANY nl~~(Aa 1 nl'Anunr' Rl:rtiallJt'I'. INIi )HMAI IIIN t'ri.mluulc lN7:l Rclcrciuc: Well c'emn:IN IV. Iru N.xth ~l~ ' \'eniul 1I VUI Rel.rtvue: I(r,X : ~%! (~~ ill l NCUlurxnl Mellxxl: Mrnnrrun l'un~lwi 4elinn lVl) It.•lircrwe: .vkn-IN III ININ.(1)MIEI Imrr 4:rn lyxlum: I~l'WlA MnU l: f t' b k W N Measurnl lN:plh ' Rckmrx~c: ih.%,_N< (c.ill ' Im% x n. y lx r r r ~urGa•. 13hplral - l'uwrN l ahulau nn hiivlaxl: binumun 1 unvuw R'amrn~e Ah lxxl: %u1~. 14 vx1 SEC"IION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target 1 11094.00 56.00 265.00 8690.07 -3449.97 -2472.56 0.00 0.00 4026.85 2 11104.00 56.00 265.00 8695.66 -3450.69 -2500.82 0.00 0.00 4034.01 3 11124.00 58.79 265.29 8706.44 -3452.12 -2517.61 14.00 5.00 4048.54 4 11270.84 96.83 268.71 8736.89 -3459.18 -2658.32 26.00 5.51 4167.52 5 11487.01 96.83 268.71 8711.18 -3464.02 -2872.90 0.00 0.00 4345.53 6 11$15.01 95.00 268.00 8708.30 -3464.82 -2900.73 7.00 -158.86 4368.72 OG-066 T2 wp06 7 11601.76 89.84 264.80 8704.64 -347026 -2987.19 7.00 -148.18 4442.46 8 12002.73 89.84 264.80 8705,80 -3506.58 -3386.52 OAO 0.00 4789.50 9 12219.84 89.90 280.00 8706.30 -3497.51 -3602.80 7.00 89.77 4960.87 06-OGB T3 wp06 10 12646.05 89.92 309.82 8707.00 -3320.00 -3985.00 7.00 89.99 5170.50 II 12816.65 89.80 321.77 8707.43 -319292 -4103.73 7.00 90.59 5196.98 12 13059.37 89.80 321.77 8708.30 -3007.27 -4253.94 0.00 0.00 5209.58 06-OGB T4 wp06 0 0 r t 0 z 0 till%VIiY I'%1 %:1f,1M I'ImI: INr-I1Gn u~01i 111(.-0(r/I'lyr G-U(rnl Ikrlll tm nepli lu .gun c}"I'Ln Irul l'rul~a Liy: I/iEllal nu>ilu:v l'li~vn ll vr I)aW: (rlX21NI5 Ila'W lxl Ilusy.i] 1'Ianwrl.INraMN rrrlpc V':i AIWU•II~R: Aft ('Itu:k..~~' 1)atc'. WI~.I.I. IIr:I AIIT N:urre ~N.-1 ~I~-W 16rNanE I~~wnN I.aulak I.nngnnk ~IuI IK.aNi -I I )~.Yl IZ?•1.'M 59•NI]tc.lo nNCu2x.?I ]IY Ia:iJ.Wr.N la%"2' )'<1hI:W I%. TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Shape 06-OGBTI PBI 8690.30 -3450.00 -2492.90 5937224.88 683521.31 Poim OG-OGB Poly 8690.30 -3564.45 -291720 5937100.00 683099.99 Polygon 06-06B Fault2 8690.30 -3963.75 -4532.54 5936661.00 681495.09 Polygon OG-OGB Faultl 8690.30 -3979.89 -4486.7? 5936646.00 681541.29 Polygon OG-OGB T3 wp06 8706.30 -3497.51 -3602.80 5937150.00 682412.99 Point 06-OGB T2 wp06 8708.30 -3464.82 -2900.73 5937200A0 683113.99 Point 06-066 T4 wp06 8708.30 -3007.27 -4253.')4 >937624.00 681749.99 Point I - - I I _ FORMATION TOP DETAILS - -- - ~ ~ No. TVDPath MDPath Formation - - -- - - - - ~~ ~ 1 8690.30 11094.42 TSGR 2 8714.30 11140.17 TSHA _ I ~ CASING DETAILS - - - I ~ No. TVD MD Name Size _ __ - - I I 8690.30 11094.42 7" 7.000 - _ - - _ I 2 8708.30 13059.00 4 1/2" 4.500 -3600 -3300 -3 West(-)/East(+) [300Win] -2400 lxoo i Sperry-Sun BP Planning Report Company: BP Amoco Date: 6/8/2005 Time: 13:57:52 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 06-06, True North Site: PB DS 06 Vertical (TVD) Reference: 36.8 + 28.5 65.3 Well: 06-06 Welipath: Plan 6-066 Secfion (VS) Reference: Survey Calculation Method: Well (O.OON,O.OOE,234.74Azi) Mittmum Curvature Db: Oracle Plan: 06-066 wp08 Date Composed: 4/14/2005 Version: 53 Principal: Yes Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB DS 06 TR-10-14 UNITED STATES :North Slope Site Position: Northing: 5941880. 59 ft Latitude: 70 14 46.529 N From: Map Easting: 684674. 88 ft Longitude: 148 30 29.224 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.40 deg Well: 06-06 Slot Name: 06 06-06 Well Position: +N/-S -1175.93 ft Northing: 5940735. 10 ft ~ Latitude: 70 14 34.962 N +E/-W 1224.96 ft Easting : 685928. 21 ft ~ Longitude: 148 29 53.612 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter ` Hole Size Name ft ft in in 11094.42 8690.30 7.000 8.500 7" 13059.00 8708.30 4.500 6.125 41/2" Formations MD TVD Formations ft ft'` Lithology Dip Angte deg Dip Direction deg 0.00 UG3 0.00 0.00 0.00 UG1 0.00 0.00 0.00 WS2 0.00 0.00 0.00 WS1 0.00 0.00 0.00 CM3 0.00 0.00 0.00 CM2 0.00 0.00 0.00 CM1 0.00 0.00 0.00 THRZ 0.00 0.00 0.00 BHRZ 0.00 0.00 0.00 TJC 0.00 0.00 0.00 TJB 0.00 0.00 0.00 TJA 0.00 0.00 11094.42 8690.30 TSGR 0.00 0.00 11140.17 8714.30 TSHA 0.00 0.00 0.00 TSAD 0.00 0.00 0.00 42S6 0.00 0.00 0.00 TCGL 0.00 0.00 Targets Map Map <-- Latitude -> <- Longitude -> Name D.escripHon TVD +N/-5 +E!-W Northing Easting Deg Min Sec Deg. 1YIin Sec Dip. Dir. ft ft ft ft ft 06-06B T1 P61 8690.30 -3450.00 -2492.90 5937224.88 683521.31 70 14 1.027 N 148 31 6.053 W 06-066 Poly 8690.30 -3564.45 -2917.20 5937100.00 683099.99 70 13 59.900 N 148 31 18.381 W -Polygon 1 8690.30 -3564.45 -2917.20 5937100.00 683099.99 70 13 59.900 N 148 31 18.381 W -Polygon 2 8690.30 -3647.16 -3619.49 5937000.00 682399.99 70 13 59.084 N 148 31 38.788 W -Polygon 3 8690.30 -3534.85 -4116.91 5937100.00 681899.99 70 14 0.186 N 148 31 53.244 W -Polygon 4 8690.30 -3382.42 -4213.18 5937250.00 681799.99 70 14 1.685 N 148 31 56.044 W -Polygon 5 8690.30 -2928.58 -4362.04 5937700.00 681639.99 70 14 6.147 N 148 32 0.377 W -Polygon 6 8690.30 -2931.79 -4232.07 5937700.00 681769.99 70 14 6.116 N 148 31 56.600 W Sperry-Sun BP Planning Report Company: BP Amoco Date: 6/8/2005 Time: 13:57:52 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 06-06, True North Site: PB DS 06 Vertical (TVD) Reference: 36.8 + 28.5 65.3 Well: 06-06 Section (VS) Reference: Well (O.OON,O.OOE,234.74A2i) Wellpath: Plan 6-066 Survey Calculation Method: Minimum Curvature Db: Oracle Targets Map Map <--- Latitude -~ <__ -Longitude -> Name Description TVD +N/-S +E/-W Northing: Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft -Polygon 7 8690.30 -3086.19 -4055.82 5937550.00 681949.99 70 14 4.599 N 148 31 51.476 W -Polygon 8 8690.30 -3263.29 -2959.78 5937400.00 683049.99 70 14 2.862 N 148 31 19.622 W -Polygon 9 8690.30 -3291.16 -1830.06 5937400.00 6841'79.99 70 14 2.591 N 148 30 46.793 W -Polygon 10 8690.30 -3611.09 -1837.95 5937080.00 684179.99 70 13 59.445 N 148 30 47.020 W -Polygon 11 8690.30 -3675.03 -2489.77 5937000.00 683529.99 70 13 58.814 N 148 31 5.960 W 06-066 Fault 2 8690.30 -3963.75 -4532.54 5936661.00 681495.09 70 13 55.965 N 148 32 5.314 W -Polygon 1 8690.30 -3963.75 _ -4532.54 5936661.00 681495.09 70 13 55.965 N 148 32 5.314 W -Polygon 2 8690.30 -3710.57 -4495.48 5936915.00 681525.89 70 13 58.456 N 148 32 4.242 W -Polygon 3 8690.30 -2935.58 -4646.02 5937686.00 681356.29 70 14 6.077 N 148 32 8.630 W -Polygon 4 8690.30 -2085.14 -5056.69 5938526.00 680924.79 70 14 14.438 N 148 32 20.581 W -Polygon 5 8690.30 -2935.58 -4646.02 5937686.00 681356.29 70 14 6.077 N 148 32 8.630 W -Polygon 6 8690.30 -3710.57 -4495.48 5936915.00 681525.89 70 13 58.456 N 148 32 4.242 W 06-066 Fault 1 8690.30 -3979.89 -4486.72 5936646.00 681541.29 70 13 55.807 N 148 32 3.982 W -Polygon 1 8690.30 -3979.89 -4486.72 5936646.00 681541.29 70 13 55.807 N 148 32 3.982 W -Polygon 2 8690.30 -3842.67 -4128.70 5936792.00 681895.79 70 13 57.158 N 148 31 53.582 W -Polygon 3 8690.30 -3953.10 -3707.47 5936692.00 682319.59 70 13 56.075 N 148 31 41.340 W -Polygon 4 8690.30 -3928.98 -3144.07 5936730.00 682882.19 70 13 56.314 N 148 31 24.970 W -Polygon 5 8690.30 -3887.94 -2942.59 5936776.00 683082.59 70 13 56.719 N 148 31 19.116 W -Polygon 6 8690.30 -3989.20 -1919.71 5936700.00 684107.59 70 13 55.726 N 148 30 49.393 W -Polygon 7 8690.30 -3887.94 -2942.59 5936776.00 683082.59 70 13 56.719 N 148 31 19.116 W -Polygon 8 8690.30 -3928.98 -3144.07 5936730.00 682882.19 70 13 56.314 N 148 31 24.970 W -Polygon 9 8690.30 -3953.10 -3707.47 5936692.00 682319.59 70 13 56.075 N 148 31 41.340 W -Polygon 10 8690.30 -3842.67 -4128.70 5936792.00 681895.79 70 13 57.158 N 148 31 53.582 W 06-06B T3 wp06 8706:30 -3497.51 -3602.80 5937150.00 682412.99 70 14 0.556 N 148 31 38.305 W 06-066 T2 wp06 8708.30 -3464.82 -2900.73 5937200.00 683113.99 70 14 0.880 N 148 31 17.904 W 06-066 T4 wp06 8708.30 -3007.27 -4253.94 5937624.00 681749.99 70 14 5.374 N 148 31 57.235 W Plan Section Information MD Incl' Azim TVD` +N/-S +FJ-W DL$ Build' Turn TFO Target ft .deg deg ft ft ft deg/1OOft deg/100ft deg/100ft deg 11094.00 56.00 265.00 8690.07 -3449.97 -2492.56 0.00 0.00 0.00 0.00 11104.00 56.00 265.00 8695.66 -3450.69 -2500.82 0.00 0.00 0.00 0.00 11124.00 58.79 265.29 8706.44 -3452.12 -2517.61 14.00 13.95 1.43 5.00 11270.84 96.83 268.71 8736.89 -3459.18 -2658.32 26.00 25.90 2.33 5.51 11487.01 96.83 268.71 8711.18 -3464.02 -2872.90 0.00 0.00 0.00 0.00 11515.01 95.00 268.00 8708.30 -3464.82 -2900.73 7.00 -6.53 -2.53 -1 58.86 06-066 T2 wp06 11601.76 89.84 264.80 8704.64 -3470.26 -2987.19 7.00 -5.95 -3.69 -1 48.18 12002.73 89.84 264.80 8705.80 -3506.58 -3386.52 0.00 0.00 0.00 0.00 12219.84 89.90 280.00 8706.30 -3497.51 -3602.80 7.00 0.03 7.00 89.77 06-06B T3 wp06 12646.05 89.92 309.82 8707.00 -3320.00 -3985.00 7.00 0.00 7.00 89.99 12816.65 89.80 321.77 8707.43 -3197.92 -4103.73 7.00 -0.07 7.00 90.59 13059.37 89.80 321.77 8708.30 -3007.27 -4253.94 0.00 0.00 0.00 0.00 06-066 T4 wp06 Sperry-Sun BP Planning Report Company: BP Amoco Date: 6/8/2005 Time: 13:57:52 Page: 3 Field: Prudhoe Bay Co-or~dinate(NE) Reference: Well: 06-06, True North Site: PB DS 06 Vertic al (TVD) Reference: 36.8 + 28.5 65.3 Well: 06-06 Sectio n (VS) Reference: We41(O.OON,O .OOE,234.74Azi) Wellpath: Plan 6-066 :Survey Calculatio n Method: Minimum Curvature Db: Oracle Survev MD Incl Azim TVD Sys TVD N/S E/W DLS MapN MapE Too1/Comme t ft ,deg deg ft ft- ft ft deglQOft ft ft 11094.00 56.00 265.00 8690.07 8624.77 -3449.97 -2492.56 0.00 5937224.91 683521.65 MWD+IFR+MS 11094.42 56.00 265.00 8690.30 8625.00 -3450.00 -2492.90 0.00 5937224.88 683521.31 06-066 T1 PB1 11100.00 56.00 265.00 8693.42 8628.12 -3450.40 -2497.52 0.00 5937224.36 683516.71 MWD+IFR+MS 11104.00 56.00 265.00 8695.66 8630.36 -3450.69 -2500.82 0.00 5937223.99 683513.41 Start Dir 14/10 11124.00 58.79 265.29 8706.44 8641.14 -3452.12 -2517.61 14.00 5937222.15 683496.67 Start Dir 26/10 11140.17 62.93 265.73 8714.30 8649.00 -3453.22 -2531.68 25.73 5937220.70 683482.63 TSHA 11200.00 78.47 267.18 8733.99 8668.69 -3456.66 -2587.88 26.07 5937215.87 683426.53 MWD+IFR+MS 11270.84 96.83 268.71 8736.89 8671.59 -3459.18 -2658.32 26.00 5937211.61 683356.18 End Dir :1127 11300.00 96.83 268.71 8733.42 8668.12 -3459.84 -2687.26 0.00 5937210.25 683327.27 MWD+IFR+MS 11400.00 96.83 268.71 8721.53 8656.23 -3462.07 -2786.52 0.00 5937205.56 683228.09 MWD+IFR+MS 11487.01 96.83 268.71 8711.18 8645.88 -3464.02 -2872.90 0.00 5937201.49 683141.80 Start Dir 7/100 11500.00 95.98 268.38 8709.74 8644.44 -3464.35 -2885.80 7.00 5937200.84 683128.91 MWD+IFR+MS 11515.01 95.00 268.00 8708.30 8643.00 -3464.82 -2900.73 7.00 5937200.00 683113.99 06-066 T2 wp0 11600.00 89.94 264.87 8704.64 8639.34 -3470.10 -2985.44 7.00 5937192.63 683029.45 MWD+IFR+MS 11601.76 89.84 264.80 8704.64 8639.34 -3470.26 -2987.19 7.00 5937192.43 683027.70 End Dir :1160 11700.00 89.84 264.80 8704.92 8639.62 -3479.16 -3085.03 0.00 5937181.12 682930.12 MWD+IFR+MS 11800.00 89.84 264.80 8705.21 8639.91 -3488.22 -3184.62 0.00 5937169.61 682830.79 MWD+IFR+MS 11900.00 89.84 264.80 8705.50 8640.20 -3497.28 -3284.21 0.00 5937158.10 682731.46 MWD+IFR+MS 12000.00 89.84 264.80 8705.79 8640.49 -3506.34 -3383.80 0.00 5937146.59 682632.13 MWD+IFR+MS 12002.73 89.84 264.80 8705.80 8640.50 -3506.58 -3386.52 0.00 5937146.27 682629.42 Start Dir 7/100 12100.00 89.86 271.61 8706.05 8640.75 -3509.62 -3483.68 7.00 5937140.83 682532.37 MWD+IFR+MS 12200.00 89.89 278.61 8706.26 8640.96 -3500.72 -3583.22 7.00 5937147.28 682432.64 MWD+IFR+MS 12219.84 89.90 280.00 8706.30 8641.00 -3497.51 -3602.80 7.00 5937150.00 682412.99 06-066 T3 wp0 12300.00 89.90 285.61 8706.44 8641.14 -3479.75 -3680.93 7.00 5937165.83 682334.45 MWD+IFR+MS 12400.00 89.90 292.61 8706.61 8641.31 -3447.04 -3775.36 7.00 5937196.20 682239.24 MWD+IFR+MS 12500.00 89.91 299.60 8706.77 8641.47 -3403.06 -3865.11 7.00 5937237.95 682148.45 MWD+IFR+MS 12600.00 89.91 306.60 8706.93 8641.63 -3348.48 -3948.82 7.00 5937290.44 682063.42 MWD+IFR+MS 12646.05 89.92 309.82 8707.00 8641.70 -3320.00 -3985.00 7.00 5937318.02 682026.55 MWD+IFR+MS 12700.00 89.88 313.60 8707.10 8641.80 -3284.11 -4025.27 7.00 5937352.91 681985.42 MWD+IFR+MS 12800.00 89.81 320.60 8707.37 8642.07 -3210.90 -4093.29 7.00 5937424.41 681915.61 MWD+IFR+MS 12816.65 89.80 321.77 8707.43 8642.13 -3197.92 -4103.73 7.00 5937437.13 681904.85 End Dir :1281 12900.00 89.80 321.77 8707.73 8642.43 -3132.46 -4155.31 0.00 5937501.30 681851.67 MWD+IFR+MS 13000.00 89.80 321.77 8708.09 8642.79 -3053.91 -4217.20 0.00 5937578.29 681787.87 MWD+IFR+MS 13059.00 89.80 321.77 8708.30 8643.00 -3007.56 -4253.71 0.00 5937623.72 681750.23 41/2" 13059.37 ~ 89.80 321.77 8708.30 ~ 8643.00 -3007.27 -4253.94 0.00 5937624.00 681749.99 06-066 T4 wp0 1 I 2 ORILL SITE N0.6 ~ I r t - I II I • LLJ• ~ ~. aC .__ ~.iTIIN .; TION I I I ; I _ - 7 ~. 12 I__ -. __. - -. L.._ __ ___ .. I SECTIONS i, 2, I I, a :2 TipN, R~4E,~v1 = 4 UU0' - ----.:. i `JVEtI NO 1 ALASKA ;TATS FLANS ZnNF 4 LAT 70 ° i4~ 4G.73~~ Y 5 941 31 7.84 LUNG 148°~9~5722~~ x Eri5769 73 '`Ll NC~.2 T 70 `• 14' 39.E 7~. Y ~ a4 1 01.3E LONG 148` 29~ 56 49" x t$F 8 i 7 E,E ~~ry ~ z t~~ ~..,: 1~~ :.u :~ ~~ ,,,y~~- 60 _ WNi No i --- -'i .. - ~ ~ Wel~ No 2~ ~Y-~ • _ ~ ~' ~{ _', 1. _ L~ ~ _ 1-164 __IY -~ ~.~ . ~~ N Well `,A'' i< o No 3 ~ i ~(f1 _ (~~~ -i139 . ~ . Well ~ I . ,. ~~ ~. ~ No.4 ,,1114 .-. ,r "~ N^ ~ v i~ ` Well '0 ~ ~ + ~' = 30p _ yNo.S D ~ * 1090 ~' O - r ~+ Well % I ~ No.6 G 1065 ~~ ~~- ~ ' N rn Well G `` ~~ r ~ N 1040 I L- ._ ~ __ ._._. _. ell .q0 59 ~I 1 I 12 m .• O i~ N •1 WELL ~J0.3 °~ p~ q ~~9 .v LA! 7p° 14' 3$ 4 ~ ° Y 5 94 i G84 Og CERTIEI~ ATE OE SURVEYOR o A~ ~°~~'0i•ee° -- -- -- _--__-- s ,~ .~~ h, LONG ~ 14$°~9~ F5 77' X 685845.36 r~C~~~ ~ ;~ °°~•~ e + ntkEtiY CERTIFY Tri„1 I AM Fkt,PEkL~ kECISTER~~~rlll • ~ WELL NG. 4 AND LICENSED Tp Pkuc,TIGE ~a~J~ s IRJEYING 't:°~~Tifd ~ :~®e THE STATE pF ALASKA QNu THAT THIS PLAT Ieee.'sse°°.ie.a.ees e°°°.~%-.°~ LAT. 70° 14~ 37.26" Y 5 940967.54 REP~.ESENTS A LOC,=TIpP~ SUk~EY taA~~E EY ME Os~~;A~~ ~~~r~ LONG 148°29' 5506 ~~ X 685 872.80 pk UNC Ek MY 5 ~PERVISICN, ANf A~ ~ L•IMEN- ~ •• ~ ~~ S+ON^ AN.. 'THEN JtTA+I'= A-cE ':CkkECT ~, ~ Gary D. Drasky ~ o~ W Ell N O. 5 ~ s~ •e. 22345 ~~; Qy'~ ~ LAT. 70° 14 ` 36.11 " Y 5940 851.18 NOV. 23, 1977 G~~. D• Ora.f/C~-_- g~F9F0e~~••.°°N°~e~~Oy~/ LONG. 14 8° 29` 54.34" X 685 900.32 C~.TE - SC~RVE Of. ~ 4bd~®~S6IO~N~~,~~'o' WELL NO. 6 LAT. TO° 14` 34.96" Y 5 940 735.1 1 LONG. 148° 29` 53.61" X 68.5 928.21 NOTE ELEVATIONS WELL NO. 7 (M.L.L.W. DATUM) LAT. 70° 14` 33.80` Y 5 940 617.42 ON TOP WOOD LONG. 148° 29-` 52.87" X 685 956.53 CELLAR WELL NO. 8 WELL N0. 4 36.7 LAT. 70° 14` 32.64" Y 5 940 500.66 WELL N0. 5 36.9 LONG. 148° 29` 52. 15" X 685 984. 2 I WELL N0. 6 36. 8 - i~4 - \\ X21 `~ AFE 291781 LEGEND ~ EXISTING WELL CONDUCTOR ,Za ~~, AS BUILT ATLANTIC RICHFIELD CO. WELL N0.7F 8 ~F?!~.t SITE r~C.6 l GCAT E:: 1 N SE 1/4 .CF HROTRACTEU SEC c:, & NE 1/4 OF 1, PROTRACTED SEC. 11, T ION, R 14 E , UIy11AT MERIDIAN F'REFARED BY.._ ---- ---- HEW~TT V. LOJ~JSBURY81 ASSOC. 723 W.6th AVE. ANCHORAGE ALASKA GATE NOVEMBER 1977 scALE NCTEG _ CHKO BY 6C FIELO BK.' 77-46 i ' 148 32 00 W 0 ,~ • 07-2i_l4 u`-'~'~ ~ ~ ap 1 - , ,- la-o3a os-z ~ • os 14-33 14-32 / - / • . y. - 0 6- ~ 14-15 __ _- - --~~: o ~.. - o -~ rn .... ~~-ra .__ .._. _ u6-1 a4 ~~_ la-o' _ O©Q 1~ 06-06BPF{~i 1 1 O ~~/ _, O Q-,1 N •~ ng-124 ~ 'i3 ` aA o -1~ `680,000 ~~ r f ~•. i ~ 148: ~0 00 W i ;~~ i 48 •28 OQ W ., ~, PBU 06-06B & Pilot Hole Proposed Producer Prudhoe Oil Pool _. 2050980 j os-~ 1' SFD 6/21/2005 8-238 -23 ~ -~ `* .•, k • t ~ c~ ~ti, ~. o // `." / - _ • 1 _. 1 - _ . - „~ i ~` \ -- ,~' ,~GtQO ~ • - ~ ` ` -13 6Q0 \\\ .`iYs i Q OS ~, ,~~ ~ o0 oB- :. ,, fi ~, / I a ~ +I ° O ` ~ I ~ ~, OB-11 •r 1 ~e-o~ r. I 1 19 13-0280 ~ ~ FEFt f'i-2~~~ / 0 1 ,000 2,000 3,000 4,000 ' I ..~J0,000 - FF TERRIE L HUBB~E BP EXPLpRATIOfl- PO BOX 1966:12 '4K INC ANCHORAGE,' AK g B T5 Mastercard Check" 89.61252 209 .9519.-6:612 ORD gOpF E DATE ~ _.r'1c'~ CC $ /oo.dp First National Bank q aska Anchors 9e, AK 99501 MEMO - ARS w X011 60i, 5200 '99iti~~~622T,~~iS 56"~ 0 2Oq, •. • • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~~ ~'~ ~~~"~ ~ PTD# ' ~? . ~~C% CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (p)~ records, data and logs acquired for the pilot hole must be clearly differentiated in both name name on permit plus PH) ~~~~~"~~ ~~~izd API number (50~~`~"~= 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. -a(- 7lv Rev: 04/01/05 C\jody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHOE BAY UNIT D6-D6B Program DEV Well bore seg ^ PTD#:2050980 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV I PEND GeoArea 890 Unit 11650 On/Off Shore _~ Annular Disposal ^ Administration 1 Permitfeeattached_____..__-____________________ _____.__-__-Yes ____ - - - - 2 Lease number appropria#e_______________,__-___-_-_ ___-_----_,-_Yes ___- ---------------------------------------------------------------------- 3 Uniquewell_nameandnumber_________________________ ____-,-_-_-.Yes ____,___. _.__.____-____-_ 4 Well located in a_definedpool__________________________ _________-__Yes ___-_PRUDHOEBAY,PRUDHOEOIL-640150-,__._--_-_-____-__----__. --------------- 5 Well located proper distance from drilling unit_boundary_ - - - _ . _ - - _ - Yes - - - _ -Governed by CO 341-D: There shall be no [estriGtions as_t4 wall spacing except that no_pay shall be opened _ - _ - 6 Well located proper distance-f[om other wells_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes _ _ - _ _ - _ in a wel_I closer than 500-feet #o the boundary gflhe_affected area. _ _ - _ - _ _ . _ _ - - . _ _ _ _ - _ - - _ _ - - - - - 7 Sufficientacreageayail_ablein_drillingunit_-_-__-__--_______ _____________Yes __--_-__-_-_ - - - - - 8 If deviated,is_wellboreplatincluded_____________________ _____,---_-- Yes _____-.-_ - - - - - - - 9 Opera#or only affected party- - - - - - Yes - - - ------------------------------------------------------ 10 Ope[a#orhasappropria#e.bondinforce________________... _.-_.--.--.--Yes _____.. 11 Permitcanbeissuedwjthoutconservationorder,______-___-- -------------Yes _____-___,___.__ - - - Appr Date 12 Pe[mit_canbeissuedwithoutadministrative_app[ovai_--________ _____________Yes -_--____________________-____-_-_-__-,__, - - - SFD 6I21I2005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized by.lnjectlon Order # (put_1O# in-comments)-(for_ NA- - - - - - - - - - - - - - - - - - - - 15 All wells wthin 114_mile area of review jdent[fied (For service well only)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ . _ _ . _ . _ - _ _ - .. - - - _ _ - _ 16 Pre-produced injector: duration of pre production Less than 3 rnonths_(For service well only) - _ NA_ - - _ _ - . _ - - - - - - 17 RCMP-Finding of Consistency-has been issued-for this project_ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ - - - - - Engineering 18 Conductor string.provided - - - NA - - - - - - - - - - - - - - - - - 19 Surface casing.protects all_known_ USDWS - - - - NA - - - - - - - - - - - - 20 CMT-v_ol-adequate_to circuf_ate-o_n conductor_& surf_csg _ _ _ _ - _ _ - - _ - _ _ - _ NA_ _ - - _ - _ _ _ _ - - - - - 21 CMT_voladequate_to#ie-in long string to surf csg_______________ _____________ NA- _-____-___ - - 22 CMT_willcoyerallknown-productiyehorizons___________-____ __--_-,-----No_ -___-Slotted linec___________________ - - - 23 CasingdesigpsadequateforC,T,B&_permaf[ost------------- ---.--------Yes --------------------------------------.------------ - - - - 24 Adequatetankage_orreservepi#_-._._-_.____-__-____ -____-,__-__Yes _.-____Nabors_2ES,______-________------------- ---------------------------- 25 Ifa_re-dill,has_a10-403 forabandonmeMbeenapproved__-_-__ ___-__-_.,_Yes __-____611612005.____-__-__-______--___-_,__,_______________ ___ ___ 26 Adequatewellboreseparation-proposed___________________ _____________Yes __--._-.-_.-._- 27 Ifdiverterrequired,doesitmeetregulations-_______________ _______.___ NA_ ____-$idetrack._-_-________ - - - - - Appr Date 28 Drillingfluid_programsehematic&equiplistadequate____________ _____________Yes ______-Max MW-11.3_ppg.___-_-_______--_-___-_-____----____- -._-_- . WGA 6122/2005 29 BOPES,,dotheymeetregulation--.-------------------- ------_-__--Yes --------------------------,------------------------------ ------- ---- 30 BOPE_press rating appropriate; test to-(put prig in comments)- - _ _ . _ _ -Yes _ _ - - Tes# to 3500-psi. _MSP 2430 psi- - - - - - - - - - - - - - - - - - - - - - - - 31 Choke-manrfoldcomplies w/API-RP-53(May84)______________ ____________ Yes _______._ - - - - - - - 32 Work will occur without operation shutdo_wn--,______-__-„__ ---_-_,-_--Yes -__-____-_______________________________________ - - 33 Is presence-of H2Sgos-probable - - - - - - - Yes - - - - - - 250_Ppm onpad.- - - - - - - - - - - - 34 Mecha_nical_condition ofwells within AOR verified (For service well only) - _ _ NA_ _ - _ _ - - - - - , - - - - - Geology 35 Permit_canbeissuedwlohyd[ogen_sulfidemeasu[es____________ _____________No_ _ ____-__ThisisanH2S pad.,-___-_-_-_,___-___,-__--_-_ - - 36 Data-presented on potential oyerpressur_e zones _ _ Yes - - - - . Expected [eservoirpressure is 7,3_ppg._ Production zone will be drilled with 8.4 - 8.5 ppg_mud, _ _ _ _ - _ _ - Appr Date 37 Seismic.analysisofsha11ov1gas_zones___-_______________ _____________NA- ___-__Sidetrackwell,___-__--__-__ SFD 6121/2005 38 SeabedcondjtionsurYey_(ifoff-shore)-_-._--.____._---- -------------NA__ - - - - - - - -_ - - - - - - - 39 -Contact namelphone_for weekly progress_reports [exploratory onlyj- _ _ , - _ - _ - NA_ _ _ _ _ _ _ _ - - - - _ , _ _ _ _ _ - - - _ - - - Geologic Commissioner: Engineering Date: Commissioner: Date Com Date e This ro osed sidetrack will be Sa River roducer. A clot hole will be drilled into the Ivishak to test for future develo ment P P 9 P P P ~~~~ ~ z3-~ r ~~ potential. 4,~ • • • Well History File ~~ FED ~ 2G~1~ APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify t'inding infom~ation, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. r • • 6066P61o06112005SSN.txt Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ wed Jan 16 14:18:24 2008 Reel Header Service name .............LISTPE Date . ...................08/01/16 Ori9in ...................STS Reel Name. .... ..... .UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date . ...................08/01/16 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS writing Library Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 MW0003795164 D. RICHARDSO D. MASKELL SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD Scientific Technical services Scientific Technical Services 06-066 PB1 500292020170 BPXA Sperry Drilling Services 16-JAN-08 MWD RUN 3 Mw0003795164 A. SHANAHAN D. MASKELL 2 lON 14E 5141 1065 65.80 36.80 .Page 1 ~bS -~$ ~ t5~ss£5 • 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 6066PB1o0611200555N.txt OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 6548.0 6.125 7.000 11085.0 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 6548' MD/5434'TVD,IN THE 6-06 WELLBORE. THE WHIPSTOCK WAS POSITIONED, THE WINDOW WAS MILLED, AND A BIT OF RAT HOLE WAS DRILLED DURING MWD RUN 1. SROP DATA FOR THIS RUN ARE MERGED WITH MWD RUN 2 SROP DATA. 4. MWD RUNS 2,3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR), UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY-PHASE 4 (EWR4). MWD RUN 2 ALSO INCLUDED PRESSURE WHILE DRILLING (PWD). MWD RUN 3 ALSO INCLUDED STABILIZED LITHO-DENSITY (SLD), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AND AT-BIT INCLINATION (ABI). THERE ARE NO SEMP DATA FOR MWD RUN 2 DUE TO TOOL DAMAGE. UPHOLE SGRC TIE-IN DATA WERE MERGED WITH MWD RUN 2 DATA. 5. LOG AND MERGED DIGITAL DATA ONLY (LDWG) WERE SHIFTED TO A SCHLUMBERGER GAMMA RAY LOG RUN IN 6-06 ON 12 NOVEMBER 1976. ALL LOG HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. THESE PDC DATA WERE PROVIDED BY DOUG DORTCH (SAIC/BP) ON 14 NOVEMBER 2007, AS AUTHORIZED BY PRIYA MARAJ (BP). 6. MWD RUNS 1-3 REPRESENT WELL 6-066 PB1 WITH API# 50-029-20201-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11581'MD/8960'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME - DEEP RESISTIVITY. TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE). Page 2 • 6066P61006112005SSN.txt CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = SLIDE INTERVALS ACCOUNTING FOR BIT-TO-SENSOR DISTANCE. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 6.125" MUD WEIGHT: 8.4 PPG MUD SALINITY: 1300-5700 PPM CHLORIDES FORMATION WATER SALINITY: -24000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CM3 MATRIX DENSITY: 2.65 G/CM3 LITHOLOGY: SANDSTONE File Header Service name... .......STSLI6.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 6144.0 11525.5 RPS 6533.5 11532.5 RPD 6533.5 11532.5 FET 6533.5 11532.5 RPX 6533.5 11532.5 ROP 6559.0 11575.5 RPM 11040.5 11532.5 FCNT 11064.5 11498.0 NCNT 11064.5 11498.0 RHOB 11064.5 11512.5 PEF 11064.5 11512.5 DRHO 11064.5 11512.5 NPHI 11064.5 11498.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 6149.5 6146.5 6153.5 6150.5 6160.5 6156.5 Page 3 • 6167.0 6174.5 6179.5 6186.5 6193.5 6195.0 6200.0 6211.5 6220..5 6232.5 6241.5 6256.0 6258.5 6269.0 6284..5 6299.0 6308.0 6314.0 6325.0 6336.5 6355.0 6365.5 6372.5 6377.5 6387.5 6393.5 6407.5 6411.5 6416.0 6433.0 6447.5 6465.0 6483..0 6494.5 6500.0 6514.5 6525.5 6537.5 6545.0 11581.0 6162.5 6169.5 6172.5 6178.0 6186.0 6188.0 6195.0 6208.0 6217.0 6229.0 6238.0 6253.0 6255.0 6265.5 6284.0 6299.5 6306.0 6312.0 6321.0 6333.0 6353.0 6362.5 6369.5 6374.5 6385.0 6391.5 6405.5 6409.0 6417.5 6430.0 6445.0 6462.0 6480.5 6494.0 6499.5 6514.0 6524.0 6536.0 6545.0 11581.0 6066P61006112005SSN.txt MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MwD 2 6146.5 11085.0 MwD 3 11085.0 11581.0 REMARKS: MERGED MAIN PASS. Data Format specification Record Data Record Type... ...... .0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum Specification Block sub-type...0 • Page 4 • 6066P61o06112005SSN.txt Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CNTS 4 1 68 4 2 NCNT MWD CNTS 4 1 68 8 3 RHOB MWD G/CM 4 1 68 12 4 DRHO MWD G/CM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HOUR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD BARN 4 1 68 44 12 ROP MWD FT/H 4 1 68 48 13 NPHI MWD PU-S 4 1 68 52 14 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 6144 11575.5 8859.75 10864 6144 11575.5 FCNT MWD CNTS 144.26 3201.8 894.983 868 11064.5 11498 NCNT MWD CNTS 15038.6 50780.4 32637.8 868 11064.5 11498 RHOB MWD G/CM 0.941 3.208 2.40692 897 11064.5 11512.5 DRHO MWD G/CM -2.142 0.776 0.0191304 897 11064.5 11512.5 RPD MWD OHMM 0.71 2000 19.0504 9999 6533.5 11532.5 RPM MWD OHMM 0.44 1752.92 75.4019 985 11040.5 11532.5 RPS MWD OHMM 0.68 1887.09 6.01591 9999 6533.5 11532.5 RPX MWD OHMM 0.34 1886.95 5.55077 9999 6533.5 11532.5 FET. MWD HOUR 0.2 118.32 2.20475 9999 6533.5 11532.5 GR MWD API 17.35 556.47 111.215 10764 6144 11525.5 PEF MWD BARN 0.79 14.54 2.96669 897 11064.5 11512.5 ROP MWD FT/H 0.78 380.72 88.3931 10034 6559 11575.5 NPHI MWD PU-S 4.33 55.87 22.0438 868 11064.5 11498 First Reading For Entire File..........6144 Last Reading For Entire File...........11575.5 File Trailer Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Ty[~e ................L0 NeXt Flle Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLIB.002 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.001 Comment Record Page 5 • • 6066P61o06112005SSN.txt FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 6146.5 11052.0 FET 6537.5 11045.5 RPD 6537.5 11045.5 RPX 6537.5 11045.5 RPS 6537.5 11045.5 ROP 6564.5 11085.0 LOG HEADER DATA DATE LOGGED: 05-7UL-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11085.0 TOP LOG INTERVAL (FT): 6576.0 BOTTOM LOG INTERVAL (FT): 11085.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 19.6 MAXIMUM ANGLE: 63.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 126027 EWR4 ELECTROMAG. RESIS. 4 105242 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 6548.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 11.30 MUD VISCOSITY (S): 54.0 MUD PH: 9.4 MUD CHLORIDES (PPM): 1500 FLUID LOSS (C3): 3.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): 1.600 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .820 143.6 MUD FILTRATE AT MT: 3.000 70.0 MUD CAKE AT MT: 1.600 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Page 6 • 6066PB1o06112005SSN.txt Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Loging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPS MWD020 OHMM 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 FET MwD020 HOUR 4 1 68 16 5 GR MwD020 API 4 1 68 20 6 ROP MWD020 FT/H 4 1 68 24 7 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6146.5 11085 8615.75 9878 6146.5 11085 RPD MWD020 OHMM 0.71 2000 6.7116 9017 6537.5 11045.5 RPS MWD020 OHMM 0.68 1887.09 3.13574 9017 6537.5 11045.5 RPX MWD020 OHMM 0.66 1886.95 3.08208 9017 6537.5 11045.5 FET MWD020 HOUR 0.2 30.87 1.27266 9017 6537.5 11045.5 GR MwD020 API 20.33 365.29 113.645 9812 6146.5 11052 ROP MWD020 FT/H 0.78 380.72 90.9749 9042 6564.5 11085 First Reading For Entire File..........6146.5 Last Reading For Entire File...........11085 File Trailer Service name... .......sTSLI6.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.003 Physical EOF File Header Service name... .......STSLIB.003 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.002 Comment Record Page 7 6066PB1o0611200555N.txt • FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11035.0 11531.0 FET 11046.0 11538.0 RPM 11046.0 11538.0 RPD 11046.0 11538.0 RPX 11046.0 11538.0 RPS 11046.0 11538.0 DRHO 11070.0 11518.0 FONT 11070.0 11503.5 PEF 11070.0 11518.0 RHOS 11070.0 11518.0 NCNT 11070.0 11503.5 NPHI 11070.0 11503.5 ROP 11085.5 11581.0 LOG HEADER DATA DATE LOGGED: 11-JUL-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11581.0 .TOP LOG INTERVAL (FT): 11085.0 BOTTOM LOG INTERVAL (FT): 11581.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 55.1 MAXIMUM ANGLE: 57.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 SLD STABILIZED LITHO DEN CTN COMP THERMAL NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.125 DRILLER'S CASING DEPTH (FT): 11085.0 BOREHOLE CONDITIONS MUD TYPE: FLO PRO SF MUD DENSITY (LB/G): 8.40 MUD VISCOSITY (S): 40.0 MUD PH: 9.6 MUD CHLORIDES (PPM): 5700 FLUID LOSS (C3): 9.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATUR E (MT): .800 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .310 188.9 MUD FILTRATE AT MT: .850 70.0 MUD CAKE AT MT: .900 70.0 Page 8 • • NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: 6066P61o06112005SSN.txt Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum Specification Block sub-type...0 Name service Order Units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD030 CNTS 4 1 68 4 2 NCNT MWD030 CNTS 4 1 68 8 3 RHOB MwD030 G/CM 4 1 68 12 4 DRHO MWD030 G/CM 4 1 68 16 5 RPD MWD030 OHMM 4 1 68 20 6 RPM MwD030 OHMM 4 1 68 24 7 RPS MwD030 oHMM 4 1 68 28 8 RPX MwD030 OHMM 4 1 68 32 9 FET MWD030 HOUR 4 1 68 36 10 GR MwD030 API 4 1 68 40 it PEF MWD030 BARN 4 1 68 44 12 ROP MwD030 FT/H 4 1 68 48 13 NPHI MWD030 Pu-s 4 1 68 52 14 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 11035 11581 11308 1093 11035 11581 FONT MwD030 CNTS 144.26 3201.8 894.983 868 11070 11503.5 NCNT MWD030 CNTS 15038.6 50780.4 32637.8 868 11070 11503.5 RHOB MWD030 G/CM 0.941 3.208 2.40692 897 11070 11518 DRHO MWD030 G/CM -2.142 0.776 0.0191304 897 11070 11518 RPD MWD030 OHMM 1.29 2000 137.884 985 11046 11538 RPM MwD030 OHMM 0.44 1752.92 75.4019 985 11046 11538 RPS MWD030 OHMM 0.83 1441.39 32.389 985 11046 11538 RPX MWD030 OHMM 0.34 286.57 28.146 985 11046 11538 FET MwD030 HOUR 0.4 118.32 10.8059 985 11046 11538 GR MWD030 API 17.35 556.47 86.1163 991 11035 11531 PEF MwD030 BARN 0.79 14.54 2.96669 897 11070 11518 ROP MWD030 FT/H 1.42 205.67 64.861 992 11085.5 11581 NPHI MwD030 Pu-s 4.33 55.87 22.0438 868 11070 11503.5 First Reading For Entire File..........11035 Last Reading For Entire File...........11581 Page 9 • • 6066P61o061120055SN.txt File Trailer service name... .......STSLI6.003 service sub Level Name... version Number. ........1.0.0 gate of Generation.......08/01/16 Maximum Physical Record..65535 File Type ................Lo Next File Name...........5T5LIB.004 Physical EOF Tape Trailer Service name .............LISTPE gate . ...................08/01/16 Origin ...................STS Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE gate . ...................08/01/16 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS writing Library. Physical EOF Physical EOF End Of LIS File scientific Technical services Scientific Technical services Page 10 • 606606182005SSN.txt Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ wed ]an 16 14:52:14 2008 Reel Header Service name .............LISTPE Date . ...................08/01/16 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Tape Header Service name..... ......LISTPE Date . ...................08/01/16 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. scientific Technical services Library. Scientific Technical Services Physical EOF ~~ ~~B 1 ~ ~~d~ Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME : 06-06B .. . _ .: _,__...... ~.....,:....:,. API NUMBER: 500292020102 OPERATOR : Bp)(A LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 16-JAN-08 JOB DATA MWD RUN 2 MWD RUN 3 MWD RUN 5 JOB NUMBER: Mw0003795164 Mw0003795164 Mw0003795164 LOGGING ENGINEER: D. RICHARDSO A. SHANAHAN A. SHANAHAN OPERATOR WITNESS: D. MASKELL D. MASKELL D. MASKELL MWD RUN 6 MWD RUN 7 JOB NUMBER: Mw0003795164 MW0003795164 LOGGING ENGINEER: A. SHANAHAN A. SHANAHAN OPERATOR WITNESS: B. DECKER B. DECKER SURFACE. LOCATION SECTION: 2 TOWNSHIP: lON RANGE: 14E FNL: 5141 FSL: FEL: 1065 FWL: Page 1 aUS-O~ ~' `'~15~55~ • 60660618200555N.txt ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: 65.80 GROUND LEVEL: 36.80 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.500 9.625 6548.0 2ND STRING 6.125 7.000 11085.0 3RD STRING PRODUCTION STRING REMARKS: • 1. ALL DEPTHS ARE .MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE WAS DRILLED OFF OF A CEMENT PLUG 10' OUT OF THE 7" CASING SHOE IN 6-066 P61. 4. MWD RUNS 2,5-7 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY-PHASE 4 (EWR4). MWD RUN 2 ALSO INCLUDED PRESSURE WHILE DRILLING (PWD). MWD RUNS 5-7 ALSO INCLUDED AT-BIT INCLINATION (ABI). MWD RUN 7 ALSO INCLUDED STABILIZED LITHO- DENSITY (SLD). THERE ARE NO SEMP DATA FOR MWD RUN 2 DUE TO TOOL DAMAGE. UPHOLE SGRC TIE-IN DATA WERE MERGED WITH MWD RUN 2 DATA. 5. LOG AND MERGED DIGITAL DATA ONLY (LDWG) WERE SHIFTED TO A SCHLUMBERGER GAMMA RAY LOG RUN IN 6-06 ON 12 NOVEMBER 1976. ALL LOG HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. THESE PDC DATA WERE PROVIDED BY DOUG DORTCH (SAIC/BP) ON 14 NOVEMBER 2007, AS AUTHORIZED BY PRIMA MARAJ (BP). THIS SHIFTED DATASET BECOMES THE PDCL FOR 6-066. 6. MWD RUNS 1,2,5-7 REPRESENT WELL 6-06B WITH API# 50-029-20201-02. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13059'MD/8696'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME - DEEP RESISTIVITY. Page 2 • 606606182005SSN.txt SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = SLIDE INTERVALS ACCOUNTING FOR BIT-TO-SENSOR DISTANCE. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 6.125~~ MUD WEIGHT: 8.4 PPG MUD SALINITY: 1300-5700 PPM CHLORIDES FORMATION WATER SALINITY: 24000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CM3 MATRIX DENSITY: 2.65 G/CM3 LITHOLOGY: SANDSTONE File Header Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............Lo Previous File Name.......STSL26.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 6144.0 12998.5 RPS 6533.5 13005.5 RPD 6533.5 13005.5 RPx 6533.5 13005.5 FET 6533.5 13005.5 ROP 6559.0 13051.0 RPM 11040.5 13005.5 RHOB 11166.0 12985.5 DRHO 11166.0 12985.5 PEF 11166.0 12985.5 BASELINE CURVE FO R SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 6149.5 6146.5 6153.5 6150.5 6160.5 6156.5 6167.0 6162.5 6174.5 6169.5 6179.5 6172.5 6186.5 6178.0 6193.5 6186.0 Page 3 6195.0 6200.0 6211.5 6220.5 6232.5 6241.5 6256.0 6258.5 6269.0 6284.5 6299.0 6308.0 6314.0 6325.0 6336.5 6355.0 6365.5 6372.5 6377.5 6387.5 6393.5 6407.5 6411.5 6416.0 6433.0 6447.5 6465.0 6483.0 6494.5 6500.0 6514.5 6525.5 6537.5 6545.0 11581.0 MERGED DATA SOURCE 6188.0 6195.0 6208.0 6217.0 6229.0 6238.0 6253.0 6255.0 6265.5 6284.0 6299.5 6306.0 6312.0 6321.0 6333.0 6353.0 6362.5 6369.5 6374.5 6385.0 6391.5 6405.5 6409.0 6417.5 6430.0 6445.0 6462.0 6480.5 6494.0 6499.5 6514.0 6524.0 6536.0 6545.0 11581.0 6066061820055SN.txt PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 2 6146.5 11085.0 MwD 3 11085.0 11095.0 MwD 5 11095.0 11120.5 MwD 6 11120.5 11235.5 MwD 7 11235.5 13056.5 REMARKS: MERGED MAIN PASS. Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 • Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 Page 4 • • 606606182005SSN.txt RHOB MWD G/CC 4 1 68 4 2 DRHO MWD G/CC 4 1 68 8 3 RPD MWD OHMM 4 1 68 12 4 RPM MWD OHMM 4 1 68 16 5 RPS MWD OHMM 4 1 68 20 6 RPX MWD OHMM 4 1 68 24 7 FET MWD HRS 4 1 68 28 8 GR MWD API 4 1 68 32 9 PEF MWD B/E 4 1 68 36 10 ROP MWD FPH 4 1 68 40 11 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 6144 13051 9597.5 13815 6144 13051 RHOB MWD G/CC 1.637 3.211 2.41123 3640 11166 12985.5 DRHO MWD G/CC -0.195 0.971 0.0982701 3640 11166 12985.5 RPD MWD OHMM 0.71 2000 17.903 12945 6533.5 13005.5 RPM MWD OHMM 0.28 2000 28.9042 3931 11040.5 13005.5 RPS MWD OHMM 0.68 1887.09 6.65404 12945 .6533.5 13005.5 RPX MWD OHMM 0.66 1886.95 6.18077 12945 6533.5 13005.5 FET MWD HRS 0.2 208.95 2.93883 12945 6533.5 13005.5 GR MWD API 20.33 536.53 104,799 13710 6144 12998.5 PEF MWD B/E 0.5 9 2.42227 3640 11166 12985.5 ROP MWD FPH 0.62 845.18 90.9143 12985 6559 13051 First Reading For Entire File..........6144 Last Reading For Entire File...........13051 File Trailer service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.... .08/01/16 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLI8.002 Physical EOF File Header Service name... .....,.STSLIB.002 service sub Level Name... version Number. ......,.1.0.0 Date of Generation.....,.08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSL26.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY Page 5 • 606606182005SSN.txt VENDOR TOOL CODE START DEPTH STOP DEPTH GR 6146.5 11052.0 RPx 6537.5 11045.5 RPS 6537.5 11045.5 RPD 6537.5 11045.5 FET 6537.5 11045.5 ROP 6564.5 11085.0 LOG HEADER DATA DATE LOGGED: 05-]UL-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11085.0 TOP LOG INTERVAL (FT): 6548.0 BOTTOM LOG INTERVAL (FT): 11085.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 19.6 MAXIMUM ANGLE: 63.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 126027 EWR4 ELECTROMAG. RESIS. 4 105242 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 6548.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 11.30 MUD VISCOSITY (S): 54,0 MUD PH: 9,4 MUD CHLORIDES (PPM):. 1500 FLUID LOSS (C3): 3.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATUR E (MT): 1.600 70.0 MUD AT MAX CIRCULATING TER MPERATURE: .820 143.6 MUD FILTRATE AT MT: 3.000 70.0 MUD CAKE AT MT: 1.600 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Page 6 606606182005 5SN.txt Frame Spacing.. ..... ............60 .lIN Max frames per record .............Undefined Absent value ... ...................-999 Depth units. .. .. ..... Datum specifica tion Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPS MWD020 OHMM 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 FET MWD020 HRS 4 1 68 16 5 GR MwD020 API 4 1 68 20 6 ROP MWD020 FPH 4 1 68 24 7 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 6146.5 11085 8615.75 9878 6146.5 11085 RPD MWD020 OHMM 0.71 2000 6.7116 9017 6537.5 11045.5 RPS MWD020 OHMM 0.68 1887.09 3.13574 9017 6537.5 11045.5 RPX MWD020 OHMM 0.66 1886.95 3.08208 9017 6537.5 11045.5 FET MWD020 HRS 0.2 30.87 1.27266 9017 6537.5 11045.5 GR MWD020 API 20.33 365.29 113.645 9812 6146.5 11052 ROP MWD020 FPH 0.78 380.72 90.9749 9042 6564.5 11085 First Reading For Entire File..........6146.5 Last Reading For Entire File...........11085 File Trailer Service name... .......STSLI6.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name... .......STSLIB.003 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD curves and log header data for .each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY Page 7 • 606606182005SSN.txt VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11052.5 11059.5 LOG HEADER DATA DATE LOGGED: 11-JUL-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11095.0 TOP LOG INTERVAL (FT): 11085.0 BOTTOM LOG INTERVAL (FT): 11095.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 55.1 MAXIMUM ANGLE: 57,7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 151107 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.125 DRILLER'S CASING DEPTH (FT): 11085.0 BOREHOLE CONDITIONS MUD TYPE: FLO PRO SF MUD DENSITY (LB/G): 8.40 MUD VISCOSITY (S): 40.0 MUD PH: g,( MUD CHLORIDES (PPM): 5700 FLUID LOSS (C3): g.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .800 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .310 188.9 MUD FILTRATE AT MT: .850 70.0 MUD CAKE AT MT: .900 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 Page 8 • • 606606182005SSN.txt Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD030 API 4 1 68 4 2 Name Service Unit Min Max Mean Nsam DEPT FT 11052.5 11059.5 11056 15 GR MWD030 API 83.6 98.04 92.5727 15 First Reading For Entire File..........11052.5 Last Reading For Entire File...........11059.5 File Trailer Service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Ty e ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name... .......STSLIB.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 11046.0 11066.0 FET 11046.0 11066.0 RPM 11046.0 11066.0 RPD 11046.0 11066.0 RPS 11046.0 11066.0 ROP 11085.5 11120.5 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): First Reading 11052.5 11052.5 header data for each bit run in separate files. 5 .5000 13-7UL-05 Insite 66.37 Memory 11123.0 Last Reading 11059.5. 11059.5 Page 9 • 606606182005SSN.txt TOP LOG INTERVAL (FT): 11095.0 BOTTOM LOG INTERVAL (FT): 11123.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: ,0 MAXIMUM ANGLE: ,0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 Electromag Resis. 4 148579 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... .... ....0 Data specification Block Type.....0 Logging Direction .................Down optical log depth units...........Feet Data Reference Point ..............undefined Frame spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 6.125 11085.0 Flo Pro 8.40 46.0 9.3 5000 7.2 .000 .0 .000 172.0 .000 .0 .000 .0 Name Service order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD050 OHMM 4 1 68 4 2 RPM MWD050 OHMM 4 1 68 8 3 RPS MWD050 OHMM 4 1 68 12 4 RPX MWD050 OHMM 4 1 68 16 5 FET MWD050 HRS 4 1 68 20 6 ROP MwD050 FPH 4 1 68 24 7 Page 10 • 60660618200555N.txt First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11046 11120.5 11083.3 150 11046 11120.5 RPD MwD050 OHMM 205.02 2000 1649.23 41 11046 11066 RPM MWD050 OHMM 5.64 2000 855.384 41 11046 11066 RPS MWD050 OHMM 2.02 4.55 2.79098 41 11046 11066 RPX MWD050 OHMM 1.56 2.59 1.91341 41 11046 11066 FET MWD050 HR5 188 195.24 190.019 41 11046 11066 ROP MWD050 FPH 0.93 223.27 36.0099 71 11085.5 11120.5 First Reading For Entire File..........11046 Last Reading For Entire File...........11120 File Trailer Service name... .......STSLIB.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File TyPe ................L0 Next File Name...........STSLIB.005 Physical EOF File Header Service name... .......STSLIB.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......ST5LI6.004 comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11060.0 11182.5 RPS 11066.5 11189.5 FET 11066.5 11189.5 RPx 11066.5 11189.5 RPD 11066.5 11189.5 RPM 11066.5 11189.5 ROP 11121.0 11235.5 LOG HEADER DATA DATE LOGGED: 15-JUL-O5 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11238.0 Page 11 • 606606182005SSN.txt TOP LOG INTERVAL (FT): 11123.0 BOTTOM LOG INTERVAL (FT): 11238.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 57.1 MAXIMUM ANGLE: 78,0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 160788 EWR4 Electromag Resis. 4 156404 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data specification Block Type.....0 Log~iny Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 6.125 11085.0 Flo Pro 8.40 44.0 9.6 5100 8.2 1.060 68.0 .580 130.0 1.190 68.0 .620 68.0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD060 OHMM 4 1 68 4 2 RPM MWD060 OHMM 4 1 68 8 3 RPS MWD060 OHMM 4 1 68 12 4 RPX MWD060 OHMM 4 1 68 16 5 FET MWD060 HRS 4 1 68 20 6 GR MWD060 API 4 1 68 24 7 ROP MWD060 FPH 4 1 68 28 8 Page 12 • 606606182005SSN.txt- First Last Name service Unit Min Max Mean Nsam Reading Reading DEPT FT 11060 11235.5 11147.8 352 11060 11235.5 RPD MwD060 OHMM 1.33 2000 175.133 247 11066.5 11189.5 RPM MwD060 OHMM 0.28 1987.52 78.9537 247 11066.5 11189.5 RPS MWD060 OHMM 1.19 500.16 25.7516 247 11066.5 11189.5 RPX MWD060 OHMM 1.16 71.57 23.0134 247 11066.5 11189.5 FET MwD060 HRS 6.05 208.95 48.9204 247 11066.5 11189.5 GR MWD060 API 48.72 454.76 107.112 246 11060 11182.5 ROP MWD060 FPH 0.92 41.04 11.2896 230 11121 11235.5 First Reading For Entire File..........11060 Last Reading For Entire File...........11235.5 File Trailer Service name... .......STSLIB.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF File Header Service name... .......STSLIB.006 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: FILE SUMMARY 5000 VENDOR TOOL CODE START DEPTH STOP DEPTH DRHO 11171.5 12991.0 RHOB 11171.5 12991.0 PEF 11171.5 12991.0 GR 11183.0 13004.0 RPx 11190.0 13011.0 RPS 11190.0 13011.0 RPD 11190.0 13011.0 FET 11190.0 13011.0 RPM 11190.0 13011.0 ROP 11236.0 13056.5 LOG HEADER DATA Page 13 header data for each bit run in separate files. 7 • 606606182005SSN.txt DATE LOGGED: 18-JUL-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13059.0 TOP tOG INTERVAL (FT): 11238.0 BOTTOM LOG INTERVAL (FT): 13059.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 85.0 MAXIMUM ANGLE: 100.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 151107 ASLD Stab Azim Litho-Dens 10508945 EWR4 Electromag Resis. 4 148579 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.125 DRILLER'S CASING DEPTH (FT): 11085.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro, SW MUD DENSITY (LB/G): 8.40 MUD VISCOSITY (S): 46.0 MUD PH: 9,4 MUD CHLORIDES (PPM): 4800 FLUID LOSS (C3): 7.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): 1.100 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .530 153.0 MUD FILTRATE AT MT: 1.210 70.0 MUD CAKE AT MT: .760 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... .......... 0 Data specification Block Type..... 0 Loging Direction ................. Down Optical log depth units........... Feet Data Reference Point .............. undefined Frame Spacing....... ............ 60 .lIN Max frames per record ............. undefined Absent value ...................... -999 Depth units. .. .. .. ..... Datum Specification Block sub-type ...0 Name Service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RHOB MWD070 G/CC 4 1 68 4 2 Page 14 • 606606182005SSN.txt DRHO MWD070 G/CC 4 1 68 8 3 RPD MWD070 OHMM 4 1 68 12 4 RPM MWD070 OHMM 4 1 68 16 5 RPS MWD070 OHMM 4 1 68 20 6 RPX MWD070 OHMM 4 1 68 24 7 FET MWD070 HRS 4 1 68 28 8 GR MWD070 API 4 1 68 32 9 PEF MWD070 B/E 4 1 68 36 10 ROP MWD070 FPH 4 1 68 40 11 First Last Name service Unit Min Max Mean Nsam Reading Reading DEPT FT 11171.5 13056.5 12114 3771 11171.5 13056.5 RHOB MWD070 G/CC 1.637 3.211 2.41123 3640 11171.5 12991 DRHO MWD070 G/CC -0.195 0.971 0.0982701 3640 11171.5 12991 RPD MWD070 OHMM 4.24 213.55 18.1742 3643 11190 13011 RPM MWD070 OHMM 4.11 180.82 16.2092 3643 11190 13011 RPS MWD070 OHMM 3.44 73.9 14.1124 3643 11190 13011 RPX MWD070 OHMM 2.89 69.43 12.7557 3643 11190 13011 FET MwD070 HRS 0.43 21.95 1.85767 3643 11190 13011 GR MWD070 API 47.8 536.53 80.7729 3643 11183 13004 PEF MWD070 B/E 0.5 9 2.42227 3640 11171.5 12991 ROP MWD070 FPH 0.62 845.18 96.8628 3642 11236 13056.5 First Reading For Entire File..........11171.5 Last Reading For Entire File...........13056.5 File Trailer Service name... .......STSLIB.006 Service Sub Level~Name... version Number. ........1.0.0 Date of Generation.......08/01/16 Maximum .Physical Record..65535 File TyPe ................LO Next File Name...........STSLIB.007 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/01/16 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name .............LISTPE Date . ...................08/01/16 Ori9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. scientific Technical services Page 15 • 606g061820055SN.txt Physical EOF Physical EOF End Of LIS File Page 16