Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
205-127
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, July 22, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC L-215 PRUDHOE BAY UN ORIN L-215 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/22/2024 L-215 50-029-23274-00-00 205-127-0 G SPT 4268 2051270 1500 1436 1445 1434 1432 512 517 516 517 4YRTST P Sully Sullivan 5/14/2024 tested to 2200 for 500 psi dp 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UN ORIN L-215 Inspection Date: Tubing OA Packer Depth 8 2218 2134 2104IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS240530143647 BBL Pumped:4 BBL Returned:2.1 Monday, July 22, 2024 Page 1 of 1 MEMORANDUM TO: Jim Regg P.I. Supervisor �y FROM: Brian Bixby Petroleum Inspector �llI ILYZ-v NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 20, 2020 SUBJECT: Mechanical Integrity Tests BP Exploration (Alaska) Inc. L-215 PRUDHOE BAY UN ORIN L-215 See: Inspector Reviewed By:�,�p P.1. Supry �(L- Comm Well Name PRUDHOE BAY UN ORM L-215 API Well Number 50-029-23274-00-00 Permit Number: 205-127-0 Insp Num: mitBDB200520133952 Rel Insp Num: Inspector Name: Brian Bixby Inspection Date: 5/20/2020 i Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min --� Well L-215-Typelnj I w TVD 4zcs - Tubing std ., sz PTD zaslzzo Tes[; sPT Test 1500 IA 69 229 szo - szo -- 2243. 2233 JType psi ' — — - BBL Pumped: zs - BBL Returned: z.l OA 431 436 t a3 437 -� Interval 4YRTST IP/F P -- - — Notes: Mj�cu4e- to 1C0119J a U S, -F -,auP 6� Lolq Wednesday, May 20, 2020 Page 1 of 1 Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:205-127 6.50-029-23274-00-00 PRUDHOE BAY, SCHRADER BLUF OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 9020 8498 4594 None 1RQH 7884, 8114, 8281, 4268, 4386, 4476, Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20" 31 - 109 31 - 109 Surface 4196 9-5/8" 30 - 4226 30 - 2698 5750 3090 Intermediate Production 8970 7" 28 - 8998 28 - 4862 7240 5410 Perforation Depth: Measured depth: 7970 - 8710 feet True vertical depth: 4311 - 4711 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# x 3-1/2" 9.2#, L-826 - 8512 26 - 4602 7884, 8114, 8281 4268, 4386, 4476, 458Packers and SSSV (type, measured and true vertical depth) Liner 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 06KXW,Q 06KXW,Q 0 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Peru, Cale Cale.Peru@bp.com Authorized Name:Peru, Cale Authorized Title: Authorized Signature with Date:Contact Phone:+1 9075644522 Treatment descriptions including volumes used and final pressure: 13. Petroleum Engineer Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG 5 GINJ SUSP SPLUG 16. Well Status after work:Oil Gas Exploratory Development Stratigraphic 15. Well Class after work: 5Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured4874 Sundry Number or N/A if C.O. Exempt: N/A 3779 2507 Junk Packer Printed and Electronic Fracture Stimulation Data 5 Set Tubing Patch Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well5 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028238 & 028238 3%8 L-215 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations (4 Total) 3-1/2" Baker Premier Pkr 3-1/2" Red Spyder Valve Cale Peru Digitally signed by Cale Peru Date: 2020.05.13 11:01:48 -08'00' By Samantha Carlisle at 11:50 am, May 13, 2020 RBDMS HEW 5/13/2020DSR-5/13/2020MGR18MAY20 ACTIVITYDATE SUMMARY 4/10/2020 ***WELL S/I ON ARRIVAL***(patch tbg) R/U SWCP 4521 ***CONT WSR ON 04/11/20*** 4/11/2020 ***CONT WSR FROM 04/10/20***(patch tbg) RAN HES GAUGES/DRIFT & TAG 3-1/2" OWENS X-SPAN PATCH @ 8,017' SLM / 8,026' MD SET 3-1/2" OWEN - X-SPAN PATCH ASSEMBLY @ 8,022' MD (top of patch @ 7,994' md, 27.5' lih, 2.33 id,) LRS PERFORMED A PASSING MIT-T TO 2,747 PSI (see lrs log) ***CONT WSR ON 04/12/20*** 4/12/2020 ***CONT WSR FROM 04/11/20***(patch tbg) ATTEMPT TO SET 2-7/8" KEYLESS X-CATCHER S/D IN 3-1/2 OWEN PATCH @ 8,013' SLM (restrictions top & btm of patch) RAN 2.24" CENT, 2-7/8" BRUSH THRU OWEN PATCHES 7,987'SLM - 8,100' SLM RAN 2.305" CENT, 2-7/8" BRUSH THRU OWEN PATCHES 7,987'SLM - 8,100' SLM (hangs up slightly @ 8,013' slm) SET 2-7/8" KEYLESS X-CATCHER ON RMX PRONG @ 8,483' SLM / 8,498'MD PULL ST# 1 RK-DMYGLV @ 8,430' MD SET ST#1 RK-SPMG @ 8,430' SLM (sn : 4324, *tbg psi 587, maintain 600-700 psi*) ***CONT WSR ON 04/13/20*** 4/13/2020 ***CONT WSR FROM 04/12/20***(patch tbg LATCH UP TO ST#3 @ 8,232' MD, 40 MIN OF JARRING PART WIRE @ COUNTER HEAD WIRE STILL ACCESSIBLE AT SURFACE WITH MANLIFT RECOVERED ALL WIRE AND TOOLSTRING, LAY DOWN PCE. RIG BACK UP WITHOUT ADDITIONAL RISER PULL RK-DUMMY GLV FROM ST# 3 @ 8,332' MD ***CONT WSR ON 04/14/20*** 4/14/2020 ***CONT WSR FROM 04/12/20***(patch tbg MADE 4 UNSUCESSFUL ATTEMPTS TO SET ST# 3 @ 8,232' MD RAN BARBELED 2-7/8" BRUSH, 1-5/8" JDC, RATTLED MANDRELS, FISH VALVE FROM CATCHER SET ST# 3 RK-1, 1.5" SPMG @ 8,232' MD (SN:4325 ) PULL 2-7/8" KEYLESS X-CATCHER @ 8,483' SLM SET 3-1/2" WHIDDON CATCHER ON OWEN PATCH @ 7,984' SLM ***CONT WSR ON 04/15/20*** 4/15/2020 ***CONT WSR FROM 04/12/20***(patch tbg PULL ST# 6 RK-DMYGLV @ 7,941' MD (pulled @ 600 psi, maintained 800-900 psi) SET ST# 6 RK-SPMG (sn : 4323) PULL 3-1/2" WHIDDON @ 7,984' SLM ***WELL LEFT S/I ON DEPARTURE*** 5/7/2020 ***WELL S/I ON ARRIVAL***(patch tbg liner) PULLED RMX-PRONG W/ DMY GLV FROM 8484' SLM(8498' MD). RAN BP SBHPS PER PROGRAM(good data). SET MODIFIED RMX PRONG W/ RWF-2AIC(1-3/16'' f/n) @ 8494' SLM(8498' MD). SET 2-7/8" KEYLESS X-CATCHER ON PRONG @ 9,498' MD ***JOB IN PROGRESS, CONTINUED ON 05/08/20 WSR*** Daily Report of Well Operations PBU L-215 Daily Report of Well Operations PBU L-215 5/8/2020 ***CONTINUED FROM 05/07/20*** PULLED RK-SPMG FROM ST#1 @ 8,430' MD, SET RK-DGLV IN ST#1 @ 8,430' MD PULLED RK-SPMG FROM ST#3 @ 8,232' MD, SET RK-RWF-2AIC (5/32'' ports, 300bwpd, 0.625''spacer) IN ST# 3 @ 8,232' MD PULLED RK-SPMG FROM ST#6 @ 7,941' MD, SET RK-1, RK-RWF-2AIC (3/16'' ports, 400bwpd, 0.25''spacer) IN ST# @ 7,941 MD LRS PERFORMED PASSING STEP RATE TEST. ***JOB IN PROGRESS, CONTINUED ON 05/09/20 WSR*** 5/9/2020 ***CONTINUED FROM 05/08/20 WSR*** PULLED 2-7/8" X-CATCHER FROM TOP OF PRONG @ 8,498' MD ***WELL S/I ON DEPARTURE*** Wallace, Chris D (CED) From: AK, GWO SUPT Well Integrity <AKDCWeIIlntegrityCoordinator@bp.com> Sent: Sunday, May 10, 2020 4:27 PM To: Wallace, Chris D (CED); AK, OPS EOC Specialists; Ak, OPS GC2 Facility PTL; Ak, OPS GC2 Field PTL; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad DFT N2; AK, OPS Well Pad HUQ; AK, OPS Well Pad LV; AK, OPS Well Pad MN; AK, OPS Well Pad RJ; AK, OPS WELL PAD S; AK, OPS Well Pad SW; AK, OPS WELL PAD W; AK, OPS Well Pad Z; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; Peru, Cale; Stechauner, Bernhard Cc: Regg, James B (CED); AK, GWO DHD Well Integrity; AK, GWO SUPT Well Integrity; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Obrigewitch, Beau; Smith, Travis T (CONOCOPHILLIPS); Sternicki, Oliver R; Worthington, Aras J Subject: OPERABLE: Injector L-215 (PTD #2051270) Ready to be put on injection All, Injector L-215 (PTD #2051270) was due for its 4 -year AOGCC MIT -IA by the end of the October. The well has been shut in since 06/23/19 and is now ready to be put on injection post water flow regulator change out. The well is now classified as OPERABLE. When the well is back on injection and stable, an AOGCC witnessed MIT -IA will be performed. Please respond with any questions. Ryan Holt Well Integrity BP Global Wells Organization - Alaska Office: 907-659-5102 From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Friday, November 1, 2019 7:49 AM To: 'ch ris.waIlace @alaska.gov' <chris.waIlace @alaska.gov>; AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; Ak, OPS GC2 Facility PTL <AKOPSGC2FacilityOTL@bp.com>; Ak, OPS GC2 Field PTL <AkOPSGC2FieldPTL@bp.com>; AK, OPS GC2 OSM <AKOPSGC20SM@bp.com>; AK, OPS GC2 Wellpad Lead <AKOPSGC2WeIIpad Lead@bp.com>; AK, OPS PCC Ops Lead <AKOPSPCCOpsLead@bp.com>; AK, OPS Prod Controllers <akopsprodcontrollersl@bp.com>; AK, OPS Well Pad DFT N2 <AKOPSWellPadDFTN2@bp.com>; AK, OPS Well Pad HUQ<AKOPSWellPadHUQ@bp.com>; AK, OPS Well Pad LV <AKOPSWellPadLV@bp.com>; AK, OPS Well Pad MN <AKOPSWellPadMN@bp.com>; AK, OPS Well Pad RJ <AKOPSWellPadRJ@bp.com>; AK, OPS WELL PAD S <AKOPSWELLPADS@bp.com>; AK, OPS Well Pad SW <AKOPSWellPadSW@bp.com>; AK, OPS WELL PAD W <AKOPSWELLPADW@bp.com>; AK, OPS Well Pad Z <AKOPSWellPadZ@bp.com>; Ak, Ops West Area TL <AkOpsWestAreaTL@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; Peru, Cale <Cale.Peru@bp.com>; Stechauner, Bernhard <Bernhard.Stechauner@bp.com>; Youngmun, Alex <younak@BP.com> Cc:'Regg, James B (DOA) (jim.regg@alaska.gov)' <jim.regg@alaska.gov>; AK, GWO Completions Well Integrity <AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWelllntegri@bp.com>; AK, GWO Projects Well Integrity<AKDCProjectsWelllntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity <AKDCWeIIlntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dem pseyl@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Obrigewitch, Beau <BEAU.OBRIG EWITCH@bp.com>; Smith, Travis T (CONOCOPHILLIPS) <travis.smithl@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com> Subject: NOT OPERABLE: Injector L-215 (PTD #2051270) lapsed on AOGCC MIT -IA All, Injector L-215 (PTD #2051270) was due for its 4 -year AOGCC MIT -IA by the end of the October. The well has been shut in since 06/23/19. The well is now classified as NOT OPERABLE for tracking purposes. When the well is back on injection and stable, an AOGCC witnessed MIT -IA will be scheduled Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization -Alaska Office: 907-659-8110 Wallace, Chris D (CED) From: AK, GWO Well Integrity Engineer <AKGWOWeIISiteEnginee@bp.com> Sent: Friday, November 1, 2019 7:49 AM To: Wallace, Chris D (CED); AK, OPS EOC Specialists; Ak, OPS GC2 Facility PTL; Ak, OPS GC2 Field PTL; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad DFT N2; AK, OPS Well Pad HUQ; AK, OPS Well Pad LV; AK, OPS Well Pad MN; AK, OPS Well Pad RJ; AK, OPS WELL PAD S; AK, OPS Well Pad SW; AK, OPS WELL PAD W, AK, OPS Well Pad Z; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; Peru, Cale; Stechauner, Bernhard; Youngmun, Alex Cc: Regg, James B (CED); AK, GWO Completions Well Integrity, AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A, Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Obrigewitch, Beau; Smith, Travis T (CONOCOPHILLIPS); Sternicki, Oliver R, Tempel, Joshua; Worthington, Aras J Subject: NOT OPERABLE: Injector L-215 (PTD #2051270) lapsed on AOGCC MIT -IA All, Injector L-215 (PTD #2051270) was due for its 4 -year AOGCC MIT -IA by the end of the October. The well has been shut in since 06/23/19. The well is now classified as NOT OPERABLE for tracking purposes. When the well is back on injection and stable, an AOGCC witnessed MIT -IA will be scheduled Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization - Alaska Office: 907-659-81 10 ProActive Diagnostic Services, Inc. WELL LOG TRANS'M17 TAI. To: AOGCC Natural Resources Technician 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE: Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : 1) Leak Detection 2) Signed Print Name: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Merion Kendall LR2-1 900 Benson Blvd. Anchorage, AK 99508 GANCPDC9USAANC hou xwh BP corn and ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907)245-8952 29 -Jun -19 L-215 CD P�C�Il v q OG9 ZO�g Cc 50-029-23274-00 Date: (7/zq I PROACTIVE DIAGNOSTIC SERVICES, INC., 130W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGECMEMORYLOGCOM WEBSITE: WWW.MEMORYLOG.COM 265127 31146 https4ieadcasedholemy.shaWoint.wmpmonal,diane_Williams_.dcasedhnle_wm/Dowmeme Deektop/BP Ttanemit.docx STATE OF ALASKA ' • � a+ E I ®E v ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1AA7 t n onsn Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Plug for Reddll ❑ Perforate New Pool ❑ Repair Well 0 Reenter Susp Well ❑ Operations u w d Other: Set Tubing Patch 0 2. Operator Name: BP Exploration (Alaska), Inc 4, Well Class Before Work Development ❑ Exploratory ❑ 5. Permit to Drill Number 205-127 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service 0 1 6. API Number: 60-029-23274-00-00 7. Property Designation (Lease Number): ADL 028238 & 028238 8. Well Name and Number: PBU L-215 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. SCHRADER BLUF OIL 11. Present Well Condition Summary: Total Depth: measured 9020 feet Plugs measured 8498 feet true vertical 4874 feet Junk measured None feet Effective Depth: measured 8498 feet Packer measured 7894, 8114, 8281, 8480 feet true vertical 4594 feet Packer true vertical 4268, 4386, 4476, 4584 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20" 31 -109 31-109 Surface 4196 9-5/8" 30-4226 30-2698 5750 3090 Intermediate Production 8970 7" 28-8998 28-4862 7240 5410 Liner Perforation Depth: Measured depth. 7970 - 8710 feel feet True vertical depth: 4311 - 4711 feet feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# x 3-1/2" 9.2#, L-80 26-8512 26-4602 Packers and SSSV (type, measured and (4 Total) 3-1/2' Baker Premier Pkr 7884, 8114, 8261, 8480 4268, 4386, 4476, 4584 true vertical depth) 3-1/2" Red Spyder Valve 3779 2507 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mct Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 194 0 1200 Subsequent to operation: 0 0 1468 150 1100 14. Attachments(required per 20 MC 2507025.071. a 25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG 0 GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name. Youngmun, Alex Contact Name: Youngmun, Alex Authorized Tire: Kupawk B,ISc'hrader Bluff PE Contact Email: younakQBP.com Authorized Signature: icx 1. con rh L n Date: ' ' 119 Contact Phone: +1 907 564 4864 Form 10.404 Revised 04/2017 RBDMS )v JAN 1 12019 M& 141t ly)"i Submit Original Only Daily Report of Well Operations PBU L-215 ***WELL S/I ON ARRIVAL*** (patch tubing / liner) SET 3-1/2" x 28' OWEN X -SPAN TUBING PATCH FROM 8028'- 8054.5' ELM 12/20/2018 ***JOB COMPLETE, WELL LEFT S/I*** ***WELL FOUND S/I ON ARRIVAL***(post patch) DRIFT TO RMX PLUG 8,485' SLM W/ 10' x 1.75" PUMP BAILER (No sample). 12/30/2018 ***JOB CONTINUED ON 12/31/18*** ***JOB CONTINUED FROM 12/30/18***(post patch) PULL DMY RMX PRONG FROM 8,480' SLM. SET RMX PRONG W 1-3/16" FISH NECK AT 8480' SLM. SET 3-1/2" WHIDDON CATCHER ON X SPAN PATCH AT 8016' SLM. PULL STA#6 RK-DGLV FROM 7941' MD. SET STA#6 RK-WFR @ 7,941' MD. PULL EMPTY WHIDDON CATCHER FROM 8,016' SLM. BEGIN STEP -RATE TESTS W/ LRS. 12/31/2018 ***JOB CONTINUED ON 1/1/19*** ***JOB CONTINUED FROM 12/31/18***(post patch) LRS PERFORMED PASSING INJECTIVITV TESTS (see log). 1/1/2019 ***WELL S/I ON DEPARTURE*** TREE= 4-1/16' OIW WELLAFAD= IV FMC ACTUATOR= LEO OKB. HEV = ZONE BF.HV_ 49.8 KOP= --78.3' 0 Max Angle= 68"@6640' 20 C _- — - DatumAD= 8285' D=� Datum ND= 4400'SS 4-12' TBG, 12.6#, L-80 TGk D= 3.958"-L.46 9-5/8" CSG, 40#, L-80 BTC, D = 8.835" 4226' Minimum ID = 2.33" @ 8028' 3-1/2" OWEN X -SPAN PATCH IFA0 7" MARKER JONT w /RA TAG -t 8176 3-1/2"' MARKER JOINT w IRA TAG 8241' PERFORATION SL#."RY REF LOG: USIT ON 09262005 ANGLE AT TOP Fes: 590 @ 7970' Note: Refer to Production DB for historical perf data SIZE SPF ZONE INTERVAL Opn/Sgz SHOT SOZ 4-12" 5 Nb 7970-8005 0 0925105 8064 4-12" 5 OA 8210-8270 O 0925/05 4 4-12' 5 OBa 8330-8395 O 0925/05 0927105 4-12" 5 OBb 8420-8440 O 0925105 11H 4-12" 5 OBd 8625-8710 O 0925/05 RK 312' TBG, 9.2#/9.3#, L-80 TGI, 8512' 0087 bpf. D = 2.992' PBTD 8912- 7- LW 26#, L-80 BT4MOD, 8998' .0383 bpf. D = 6.276" SAFETY NOTES: WELL REQUIRES A SSSV WHEN L 215 ON ML WATERFLOOD INJECTION WELL HAS FOUR ZONES, WITH THE 4TH ZONE ISOLATED USING X NIPPLE INSTEAD OF A WATERFLOOD MANORS 46- 4-12" X 3-12' XO, D = 3.958- 3779- 31/2" FES X NP,lt� GAS LIFT MANDRILS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 7941 4297 60 MMG-W P-15XJR RK 17L 12131/18 5 8064 4360 58 MMG-W DMI RK 0 08114117 4 8171 4416 58 MMG-W OMI R( 0 0927105 3 8232 4449 57 MMG-W P-15XJR RK 11H 12130/13 2 8339 4507 57 MMG-W DMY RK 0 09127/05 1 8430 4557 57 MMG-W R15XFR RK 12L 12/30/13 -18498 4594 56 P-15XIR Rk9( 19L 12131/18 INSIDE X NIPPLE 7863' 3112" FES X NP, D = 2.813" 7884' T X 31/2" BKR PREMIER PKR D = 2.875" ID=2.33' (12/20/18) 8093' 3117 FES X NP, D = 2.813' 8114' 7'X31/2'BKRPFEMr=RPKRD=2.875 8260' 31/2" FES X NP, D = 2.813- 828V - 7" X 31/2" BKR PF29M8ER PKR D = Z875- 8459- X31/2'HES X W,, D=2.813' 7" X 3112" BKR PREMIER PKR D = 2.875' 8498' RMX LATCH - P-15XJR 19L(12131/18) 8498' 31/7 HES X W. D = 2.813' 1 8512' 1 DATE REV BY COMMENTS DATE REV BY COM,8NT5 09118/05 TAITLH ORIGINAL COM PLETION 01/09119 JUJM) RJLL RMX PRONGISET RM( LAI 02116/08 TW/PJC DRAWING CORRECTIONS 01/09119 JUJMO WFRCJO(12/31118) 08/17/17 JPK/JM) WFR UO (08114/17) 0125118 F2IJM) ADDED SPRINGS WEGHT TO WFR 11/13118 JMJM) PULLED WF FEG/SET RM( PRONG 011OW19 LEVJM) SET OWHN X -SPAN PATCH 1312' VVI -EG. D = 2 905" 1 ORLON (ANT WELL: L-215 PERMIT No: "1051270 AR No: 50-029-23274-00 F12K RI E, 2594' FSL 8 1677' FWL BP Exploration (Alaska) E • •ALASKA OIL AND GAS CONSERVATION COMMISSIONJAN 2 6 2018 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed AOGGC Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate ❑ Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Convert to WAG iZi 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 205-127 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service E1 6. API Number: 50-029-23274-00-00 7. Property Designation(Lease Number): ADL 0028238 8. Well Name and Number: PBU L-215 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,SCHRADER BLUF OIL 11.Present Well Condition Summary: Total Depth: measured 9020 feet Plugs measured 8498 feet true vertical 4874 feet Junk measured feet Effective Depth: measured 8498 feet Packer measured See Attachment feet true vertical 4594 feet Packer true vertical See Attachment feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20" 32-111 32-111 Surface 4197 9-5/8" 31 -4228 31-2699 5750 3090 Intermediate Production 8972 7" 28-9000 28-4864 7240 5410 Liner Perforation Depth: Measured depth: 7970-8710 feet feet True vertical depth: 4311-4711 feet feet Tubing(size,grade,measured and true vertical depth) 4-1/2"x3-1/2",L-80 26-8514 26-4603 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 3-1/2"Red Spyder Valve 3779 2507 12.Stimulation or cement squeeze summary: Intervals treated(measured): ����� ' " t` Treatment descriptions including volumes used and final pressure: 0 ``r/a. `t'") 1, c U)r)1I 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: -2035 0 2142 Subsequent to operation: -817 200 1184 14.Attachments:(required per 20 MC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development LI Service WI Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 317-026 Authorized Name: Zoesch,Eric Contact Name: Zoesch,Eric Authorized Title: Production Engineer Contact Email: zoese0@BP.com Authorized Signature: — 1�a Date: f-- J (-// Contact Phone: +1 907 564 4695 Form 10-404 Revised 04/2017 V rt.- 3111 t 6,0/ /4 Submit Original OnlyMIMS V IAv 2 9 2C18 • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary January 26, 2018 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Conversion to WAG covered by Sundry Approval # 317-026 for Well # L-215, PTD # 205-127. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • Packers and SSV's Attachment PBU L-215 SW Name Type MD TVD Depscription L-215 TBG PACKER 7885.86 4269.19 3-1/2" Baker Premier Packer L-215 TBG PACKER 8116 4387.12 3-1/2" Baker Premier Packer L-215 TBG PACKER 8283.39 4477.3 3-1/2" Baker Premier Packer L-215 TBG PACKER 8482.18 4585.25 3-1/2" Baker Premier Packer L-215 SSSV 3779 2506.84 3-1/2" Red Spyder Valve 0 • o a) a 0 I N L ._ U Q C § .Q co * Cocn U) * O V) - C U) O CT) LU pip UI) a) U) N- o E D 11.1 o � ca a 7 cn u) J O O �` N co cn W a) u) v o E o DO o O -0 N0 X00 Z o V 2 C O 0 O 2 2 CO co-` U H (n J U) v O (I) a) 13 a) (n O O a_Q (n 7 f3 EN u� c co b Li p > �O011 7 -o H c co co O N V ci) a_ a) W ID O O CO a LOU)H 0 0 a(n W e X N W 0 W O O o rn W a) i J Q o •- W CC E d -0 0 Y E a) �a LU = O )- C/I) Ui L. �L cn vo) © H d � � cn OO gi� o cu Q.CD2v) O U _J° ' a- O c � o N oZOOO a) O � -a Q in (7,3“, 5 z c)Z W a) m a) a_ 0 3 0 r 3 W a ~ C X C'7 O s E O * Ch a) J W C`') �n CO N m .`_ d N H 'Cr QZ � -c,_, 3 a) � CO p Orn * o J o 0 cn 3 00 o Ha) 3 0 D ,s, O o Q oo Q cn J * H pp v) cn Q w cn N O J op F- a) J m2 g --, J (a 3 was _ � tea. v F- J cn Ut3Lo a) O m jIL Y cno1-°�)O@�co H -Jp Os °b 3o 8 � o � crwQ42 � � cn F- Ln c ;-O o co W O J � 0 Q w d E � 0 * N. 0 w1.- Q in c n ° * F- °D F- W a_ c Q o cc O 00 m oo U. Z C * O N. o o W Q o D ,* ul = c N. CL @)H �W H a_ cn cn a; C° N.- a) d ZW * U) c- coD a-F- U) OLL * Q Fp 1:3a) Lo ,,,Cr > er202 0 : Es CL O J '' a_ N J V W U) U) r Q O •g- J 4# F- F- X Z O v Z = a m ch co _> O W V O O ao m Z W Z Z J 2 _ a0 mF- � � ao - U OJ Q QQ � E u' O n- CO W �U W r U o E 3 2E a_ w F- W =, O W F- I w o 0 Z Z Oo O Z Et O J J (n CL D Z H a) a) 0 2 U) z LL .- (n LTL J 0 X w Q Z , L L F- a0 N LLOuLZ W O cn0 � a } � Litp 0 YX W G2W013i Z N O X 0 a' fla X W - a >` � m'- i° 0W OX O O C 3 J X F- Z F- F- X N D � 0 F- i'ii) m> M F- X i)' C Z a 0' N � O ' C l- 000 W- °' O OL O --11- m � oLWill O i° ao cnc) rn EoCda Ja_ c� EL Jo_ ac) 65 � L7 Z0 * UJI-L- HH -I (n � UO - •+' UZ � F- (nZJcnF- cn -1F- (n (� v) * W' * * * a. mcncna_ _i2 * H a2. w1, ce `i° cn � a_ � cn _, a (n _1 * : CO W H Q N- t` N N- r--- 0T__ C- r O O o O H N N N N N N M CO NC V _ r F- o0 0-5 aa m ao 0 Q 0 0 C In' 2 _\ // --- / ® » g a ) Do = 2 % m ® o \ \ \ CO / \ n 4-6 \ \ a D \ _0\ a / \ < CU \ / a c > / \ E2 \ / © Ca co- \ o 2 WE \ / 0 zo c ± m\ m w ®a 2 mu_ 0:1 a ° E / O = / \ ® \ G O< a \ / co@Z »U) r = ® Q 0 co ±c _ eco $ yc > ± m\ m 2 / z p 2 - 3 3 R E < , -c i z c 2 —I - d Z \ k �� / fE $ f o / Z ~ & m ® O. a cL @ 0 pDe -m0 w@ 2 � � \ / 2-L/ _ _ co co \ @ c4 \ / 2 $ < w / L.L. 2 3 m I 3 Rim \ - 0,H / / // I / * � cr f c m m < m E 0 ± c ± 2 c ± ± @ 9-1 Elk / \ / h < . i O / ± / cc a_0 \ \ \ N- O UJ - 0 - ? \ \ \ Ce _ U 4 / _Z \ \ \ \ / / x ® / c >. - / / \ C � 0 \ 6kco - / @z . \ \ / § > $ / I i / / / / / / / mw \ \ E2 / / � zE ± Drla / DOWO Cn \ / \f \ / / N \ cQr_JWIH c � � o � L - \ \ wN / - - \ ° Z w r \ 2 / \H Z 2 g Z q / @@ \ x g / / / z5soZZ / � % Z00 Lii 00HZ � F_ Z co co Luw 5 03 ) § i J ƒ ƒ \ i i < } ? / D i / w w N-- / / \ mo LO 3 c_ \ \ Co Co Co TREE= 4-1/16"CIWIII SA NOTES: WELL REQUIRES A SSSV WHEN OELLHEAD= 11"FMC L-215 ON MI. WATERFLOOD INJECTION WELL HAS FOUR ACTUATOR= LEOZONES,WITH THE 4TH ZONE ISOLATEDUSING X OKB.ELEV= 78.3' NIPPLE INSTEAD OF A WATERR.000 MANDREL BF.ELEV= 49.8 IJ I 46' —�4-1/2"X 3-1/2"XO,D=3.958" KOP= 400' MU Angle= 68°@ 6640' 20"COPDUCTOR, H 109' 1/ 3779' PA 3-112"HES XP,D=2.813" Datum MD= 8285' ID=2 I Datum TVD= 4400'SS GAS LFT MANDRELS [4-1/2"TBG, 12.6#,L-80 TC-I,D=3.958" H 46' ST MD TVD DEV TY FE VLV LATCH PORT DATE i 7 7740 4202 63 MM'MG DFE 0 09/27/05 9-5/8"CSG,40#,L-80 BTC,D=8.835" H 4226' WATERFLOOD INJECTION MANDRELS 7 -ST MD TVD DEV TYPE VLV LATCH FORT DATE 6 7941 4297 60 MMG-W DMY RK 0 09/27/05 5 8064 4360 58 MMG-W DMY RK 0 08/14/17 4 8171 4416 58 MMG-W DMY FE 0 09/27/05 Minimum ID =2.813" 3779' 3 8232 4449 57 MMG-W P-15XJR RK 11H 12/30/13 2 8339 4507 57 MMG-W DMY RK 0 09/27/05 3-1/2" HES X NIPPLE 1 8430 4557 57 MUG-W P-15XJR Pot 12L 12/30/13 8498 4594 56 P-15XJR RMX 19L 08/14/17 I ^ "WIDE X APPLE 7863' —13-1/2"HES X NP,D=2.813' 2KIL:112<\ 7884' 1--7"X 3-1/2"BKR PREMIER PKR D=2.875" 7'MARKER JOINT w/RA TAG H 7946' }---1 U 8093' H 3-1/2"HES X NP,D=2.813" X 8114' —7"X 3-1/2"BKR PREfu1ER PKR,D=2.875" 77 7"MARKER JOINT w/RA TAG --I 8176' 1-11 ELI [I 3-1/2""MARKER JOINT w/RA TAG H 8241' 11 I , 8260' H 3-1/2"HES X NP,D=2.813" PERFORATION SUMMARY X8281° —7"X 3-1/2'BKR FREVIER PKR,D=2.875" REF LOG: USFF ON 09/26/2005 r----1 ANGLE AT TOP FERE: 59°@ 7970' Note:Refer to Production DB for historical pert data IMF SIZE SFF ZONE INTERVAL Opn/Sgz SHOT SOZ ' ' 8469' H3-1/2"HES X NP,D=2.813" 4-1/2" 5 Pb 7970-8005 0 09/25/05 4-1/2" 5 OA 8210-8270 0 09/25/05 4-1/2" 5 OBa 8330-8395 0 09/25/05X x 8480' —17"X 3-112"BKR PREMIER FKR,ID=2.875" 4-1/2" 5 OBb 8420-8440 0 09/25/05 4-1/2" 5 OBd 8625-8710 0 09/25/05 8498' —i3-1/2"HES XPAP,D=2.813" I 8498' —WF REGULATOR(MR)R15XJR w I X LOCK LATCH(08114/17) 3-1/2"TBG,9.2#/9.3#,L-80 TC-I, H 8512' , `—_` .0087 bpf,D=2.992" 8512' —13-1/T VVLEG,D=2.905" L PBTD —I 8912' . •�i�i�i�i�i�i�i�i�i• 7"LM,26#,L-80 BTC-MOD, —I 8998' I4.4.4.4.4.4.4.�.44.j .0383 bpf,ID=6.276" DATE REV BY COM+U'ITS DATE REV BY COMMENTS ORION UNIT 09/28/05 TAITLH ORIGINAL COMPLETION 08/17/17 JFi</JA4) VVFR C/O(08/14/17) WELL: L-215 02/16/08 TW/PJC DRAWING CORRECTIONS 01/25/18 EZ/JMD 'ADDED SF14NG WEIGHT TO VVFR PEF AT Pb: `2051270 09/28/09 CJWSV WFR C1O(07/28/09) AFI No: 50-029-23274-00 02/15/11 kB/JAAD ADD®SSSV SAFELY NOTE SEC 34,T12N,R11E,2594'FSL&1677'FWL 03/31/11 DAV/PJC WRF C/O(03/27/11) 02/21/14 G1F/JWD MRC/O(12/30/13) BP Exploration(Alaska) • • Wallace, Chris D (DOA) From: Wallace, Chris D (DOA) Sent Monday, November 20, 2017 9:48 AM To: 'AK, GWO Well Integrity Engineer' Subject: RE:Clarification for sundry317-026: PWI to WAG conversion for Injector L-215 (PTD# J 2051270) Joshua, Yes,Victoria and I agree the next required MIT is before or during the month of October 2019(unless integrity issues or wellwork dictate otherwise.) Thanks and Regards, Chris Wallace,Sr. Petroleum Engineer,Alaska Oil and Gas Conservation Commission,333 West 7th Avenue,Anchorage,AK 99501, (907)793-1250(phone),(907) 276-7542(fax),chris.wallace@alaska.gov CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska.gov. From:AK,GWO Well Integrity Engineer[mailto:AKGWOWellSiteEnginee@bp.com] Sent:Saturday, November 18, 2017 1:34 PM To:Wallace,Chris D(DOA)<chris.wallace@alaska.gov> Subject:Clarification for sundry 317-026: PWI to WAG conversion for Injector L-215(PTD#2051270) Hi Chris, I was looking over the sundry 317-026 for the PWI to WAG conversion of well L-215 (PTD#2051270)and had a question about the MIT requirements. The sundry has the"Mechanical Integrity Test"check box ticked under the"conditions of approval: Notify Commission so that a representative may witness", but does not have the post initial injection MIT required box checked. I just want to clarify that the well will not require an additional MIT outside of the normal test cycle which was last tested on 10/18/2015 and was witnessed by Jeff Jones. If I'm interpreting the sundry incorrectly, and the well will need an MIT before being placed on MI injection please let me know at your convenience. Thanks, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 YY 1 205-�2-1 RECEIVED 0 OCT 19 2017 WELL LOG TRANSMITTAL#904238167 o®� PC Alaska Oil and Gas Conservation Comm. October 16, 2017 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 ii.+2017 r: BENDER RE: Leak Detect Log: L-215 Run Date: 8/15/2017 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 L-215 Digital Log Image files 1 CD Rom 50-029-23246-00 Leak Detection Log 1 Color Log 50-029-23246-00 SCOW . 5 E'E PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Chris Gullett 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 FRS_ANC@halliburton.com Date: Signed:/ vA.Sar42°v `e+eta'"'-C • y OF ? • • //7,-w,s. THE STATE . Alaska Oil and Gas ti ;-sem 14 ofLASKA Conservation Commission s}fit 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 "wh Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Eric Zoesch Production EngineerSCO**)3 rA- ' y BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 Re: Prudhoe Bay Field, Schrader Bluff Oil Pool, PBU ORIN L-215 Permit to Drill Number: 205-127 Sundry Number: 317-026 Dear Mr. Zoesch: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this Ay of March, 2017. RBDMS LLAPR - 3 2017 RECEIVED OF ALAS •ALASKA OIL AND G E ST CONSERVATION COMMISSION JAN 1 9 2017 APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 AOGCC 1. Type of Request: Abandon ❑ Plug Perforations o Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing 0 Other Convert to WAG m• 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 205-127 • Exploratory 0 Development ❑ 3, Address: P.O.Box 196612 Anchorage,AK 6. API Number: 50-029-23274-00-00 99519-6612 Stratigraphic ❑ Service RI• 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No IJ PRUDHOE BAY UN ORIN L-215 . 9. Property Designation(Lease Number): 10. Field/Pools: ADL 0028238 • PRUDHOE BAY,SCHRADER BLUF OIL' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 9020 . 4874 • 8498 4594 8498 Casing Length Size MD TVD Burst Collapse Structural Conductor 79 20"166.4#X-56 32-111 32-111 Surface 4197 9-5/8"40#L-80 31-4228 31 -2699 5750 3090 Intermediate Production 8972 7"26#L-80 28-9000 28-4864 7240 5410 Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment See Attachment See Attachment See Attachment Packers and SSSV Type: See Attachment Packers and SSSV MD(ft)and TVD(ft): See Attachment No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary a Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 Service ®- 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil 0 WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG ® • GSTOR 0 SPLUG ❑ Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Zoesch,Eric be deviated from without prior written approval. Email zoeseO@BP.com Printed Name Zoesch,Eric Title Production Engineer Signature 1_ , Phone +1 907 564 4695 Date I//M-7 COMMISSION USE ONLY t I Conditions of approval:Notify Commission so that a representative may witness Nr". f Sundry Number:VI Plug Integrity 0 BOP Test 0 Mechanical Integrity Test tB Location Clearance 0 ^�}O�� Other: L tS C" I2-cA 140 Post Initial Injection MIT Req'd? Yes 0 No tr Spacing Exception Required? Yes 0 No IZ Subsequent Form Required: /0—'4-0' - APPROVED BYTHE Approved by /_ _ ,/ — COMMISSIONER COMMISSION Date: 3 .2. / 7 �'��"�1�-�-VTL 3/2 9/i 7• ORIGINAL RBDMS u- APR - 32017 11/447 / K 1<a /7 61 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • by BP Exploration(Alaska)Inc. 900 East Benson Boulevard P.O.Box 196612 Anchorage,Alaska 99519-6612 (907)561-5111 January 19, 2017 Cathy Foerster Chairman Alaska Oil and Gas Conservation Commission 333 W.7th Avenue,Suite 100 Anchorage,AK 99501 RE: Change of L-215 Well status from PWI to WAG Dear Chairman Foerster: BP Exploration (Alaska), Inc. (BPXA),operator of the Prudhoe Bay Unit(PBU),on behalf of itself and the PBU Working Interest Owners, requests change of L-215 Well Status under Area Injection Order No. 26A(AIO 26A)to allow for the injection of enriched hydrocarbon gas into injection well L-215 (PTD# 205-127). AIO 26A states that all Orion service wells drilled prior to 5/1/2006 were reviewed and found suitable for EOR via enriched hydrocarbon gas injection. It was confirmed via phone conversation with Dave Roby(AOGCC Sr. Petroleum Engineer)on 1/18/17 that no further Area of Review is necessary as part of the 10-403 for L-215, since one was completed as part of AIO 26A. The attached 10-403 application seeks the reclassification of service well L-215 from PWI to WAG status based on AIO 26A and the verbal confirmation of compliance referenced above.All necessary integrity verifications will be performed per AOGCC and BP internal policy prior to commencing MI gas injection. Sincerely, Eric Zoesch Orion Petroleum Engineer CC: Danielle Ohms, BPXA Bill Bredar, BPXA Attachments: Form 10-403 • • Loepp, Victoria T (DOA) From: Zoesch, Eric <zoeseO@BP.com> Sent: Thursday, March 02,2017 10:31 AM To: Loepp,Victoria T(DOA) Cc: Ohms, Danielle H; Rupert,C. Ryan; Bredar,William L Subject: RE:PBU L-215(PTD 205-127, 317-026)Conversion to WAG Follow Up Flag: Follow up Flag Status: Flagged Victoria, • L-215 was completed on 9/27/05 and began produced water injection on 11/1/05.Since that time, it has been a full-time injection well.The only interventions have been for routine waterflood regulator valve changeouts. No integrity anomalies have been observed, and MIT history is as follows(with most recent events at top): o >10/18/2015: AOGCC MIT-IA Passed to 2460 psi o >06/25/2015: MIT-IA Passed to 2500 psi o > 12/17/2013: MIT-T Passed to 2000 psi o > 11/30/2009: AOGCC MITIA Passed to 2000 psi o > 11/06/2009: MITIA Passed to 3000 psi o >07/25/2009: MIT-T Passed to 3000 psi o >09/29/2008: MIT-T Passed to 2500 psi o >09/27/2008: MIT-T Passed to 2500 psi o > 11/28/2005: AOGCC MITIA Passed to 2000 psi o > 11/27/2005: Pre-AOGCC MITIA Passed to 1500 psi o > 11/01/2005: Put on initial PWI o > 10/21/2005: MITIA Passed to 2500 psi o >09/27/2005: Rig MITIA Passed to 4000 psi • AIO 26A is dated 5/1/2006. • There have been two well penetrations within%mile of L-215's Nb sand penetration since that date,in wells L- 203(producer with spud date 4/10/10)and L-219(WAG injector with spud date 12/12/07). Please let me know if you have any follow-up questions. Thanks, Eric Zoesch Kuparuk& Schrader PE GC-2 Area Team BP Exploration Alaska Inc. 907-564-4695(0) 406-270-9837(C) From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Monday, February 27, 2017 9:08 AM To:Zoesch, Eric<zoeseO@BP.com> Subject: PBU L-215(PTD 205-127,317-026)Conversion to WAG 1 • • Eric, Please include a brief well history including latest integrity testing(MIT-IA).What is the date of AIO 26A? Have there been any new wells drilled since then? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp[u?alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loem@alaska.gov 2 • • ao N co CO N 0 CO �} M t 0 CO O p O O I-: N N- M O a O CO N 4 I. co L '- N CD '- CO Q f� N 4 0 d M O CCS CO W ❑ M 'tCoCnCO > o v v v v v 0 04 w ❑ Z w oa ❑ I— ca 5 Y 0 O O m 0 0 < Y Y 2 cn 0 0 w w NaoNC)4 < < < w o_ o_ z = J 0 CD (0 OD 03 CO U U 0 O J J J ❑ J ❑ ❑ E Z < a 2 0 0 Q_ w 0_ ELim 2 0 0 0 w Z 0 Z a � 0 r OOOOCn 0 < aA— M N N P.; (A N M CO CO o I-- CO CO CO CO O 0 cn _ 0 0 cn a _ 2 0 cn cn cn cn cn Q) -S C CL 2 0000 d (/) a 0 t d a CD CrCO ) CO CO CO M O ❑ 0 0 0 0 0 W - Z C N N N N N Z tl Q R A— CN NCV N d W7 W (L9 ❑ W w aN N N N Q ❑ _ � _ H J W_ ❑ d 0 m ❑X ❑ 2' W - --I Q W W < < 330.. 33C0 LL. 4. LL N D_ w ai E a3 in co co co co U N N N N N J J J J J < <m m LUL u cn N D Cl' • • a) Q. OOOM O co Lo N U LaaccE NI- m r- aoa rn CSa) o N - I I I I N '- CO CO 0) M N N �h 1.0 r C E J %— c4 8 Z V' rnap t _ Q Z N N- CO CO O) • = M CO N N C O CO o O ▪ W OCD c90)0 XJos •N N O CI in CO Nr coNp coSN - CV V - n N- a N � 4 (Y) CO Co 0)) � Cf) CCD Co Nr C) '' co N (00 • Z C O O W U O LLp Z Z ZoOmm ODCL » U 0) Q I- I- • • Packers and SSV's Attachment PRUDHOE BAY UN ORIN L-215 SW Name Type MD ND Depscription L-215 TBG PACKER 7885.86 4269.19 3-1/2" Baker Premier Packer L-215 TBG PACKER 8116 4387.12 3-1/2" Baker Premier Packer L-215 TBG PACKER 8283.39 4477.3 3-1/2" Baker Premier Packer L-215 TBG PACKER 8482.18 4585.25 3-1/2" Baker Premier Packer IIITREE " 4-1/16"CIW S NOTES: WELL REQUIRES A SSSV WHEN L H WELEAD FM 11" C L 215 ON MI. WATERFLOOD INJECTION WELL HAS FOUR ACTLATOR= LEO ZONES,WITH THE 4TH ZONE ISOLATED USING X OKB_ELEV= 78.3' NIPPLE INSTEAD OF A WATERFLOOD MANDREL BE ELEV= 49.8 y J I 46' –{4-1/2"X 3-1/2"XO,D=3.958" KOP= 400' Max Angie= 68°@ 6640' 20"CONDUCTOR, 109' Datum I D= 8285' — 3779' —j3-1/2"FES X NP,D=2.813" ID=? Datum TVD= 4400'SS GAS LFT MANDRELS 4-1/2"TBG,12.6#,L-80 TGI,D=3.958" H 46• ST MD TVD DEV TY FE VLV LATCH PORT DATE �� 7 7740 4202 63 WIG DMY RK 0 09/27/05 9-5/8"CSG,40#,L-80 BTC,D=8.835" --14226' WATERFLOOD INJECTION MANDRELS M ST MD TVD DEV TYPE VLV LATCH FORT DATE 6 7941 4297 60 MMG-W DMY RK 0 09/27/05 5 8064 4360 58 MMG-W MAY RK 0 12/30/13 4 8171 4416 58 MMG-W DMY RK 0 09/27/05 Minimum ID =2.$13" 3779 3 8232 4449 57 MMG-W P-15XJR RK 11 12/30/13 2 8339 4507 57 MMG-W DMY RK 0 09/27/05 3-1/2" HES X NIPPLE 1 8430 4557 57 MMG-W P-15XJR RK 12 12/30/13 " 8498 4594 56 P-15XJR RMX 19 12/30/13 ' ^ `NSDE X NPR-E 1:-. 11:a'\\\ 7863' –3-1/2"HES X NP,D=2.813" 7884' }–7"X 3-1/2"BKR PREMIER NKR,D=2.875" 7"MARKER JOINT w/RA TAG – 7946' WIa 8093' –3-1/2"HES X NP,D=2.813" Z 8114' f–7"X 3-1/2"BKR PREMER NKR,D=2.875" IIIIP 7"MARKER JOINT w/RA TAG –I 8176' Mr 3-1/2""MARKER JOINT w/RA TAG H 8241' t I I 8260' H3-1/2"HES X NP,D=2.813" PERFORATION SUM ARY8281' –7"X 3-1/2"BKR PREMER PKR,D=2.875" RIB=LOG: USFT ON 09/26/2005 ANGLE AT TOP PERF: 59°@ 7970' Xcar• Note:Refer to Production DB for historical perf data IM SIZE SFE ZONE INTERVAL Opn/Sqz SHOT SQZ ' ' 8459' –3-1/2"HES X NP,D=2.813" 4-1/2" 5 Nb 7970-8005 0 09/25/05 4-1/2" 5 OA 8210-8270 0 09/25/05 4-1/2" 5 OBa 8330-8395 0 09/25/05 8480' –17"X 3-1/2"BKR PREMIER PKR ID=2.875" 4-1/2" 5 OBb 8420-8440 0 09/25/05 • 4-1/2" 5 OBd 8625-8710 0 09/25/05 8498' –13-1/2"HES X NP,D=2.813" ,�II .. 8498' –WF REGULATOR(WFR)R 15XJR w/X LOCK LATCH(12/30/13) 3-1/2"TBG,9.2#/9.3#,L-80 TGA, – 8512' ' ._ 8517 H 3-1/2"WLEG,D=2.905" .0087 bpf,ID=2.992" [L PBTD lH 8917 7"LNR,26#,L-80 BTC-MOO, –I 8998' 11.14111.1.1.1.111.111 .0383 bpf,D=6.276" DATE REV BY COMMENTS DATE REV BY CONVENTS ORION LNT 09/28/05 TAtTLH ORIGINAL COMPLETION WELL: L-215 02/16/08 TW/PJC DRAWING CORRECTIONS PE.RMT No:p2051270 09/28/09 CJPVSV WFR C/O(07/28/09) _ AR No: 50-029-23274-00 02/15/11 MB/JMO ADDED SSSV SAFETY NOTE SEC 34,T12N,R11E,2594'FSL&1677'PAL 03/31/11 DAV/PJC WRF C/O(03/27/11) 02/21/14 GJF/JMD WFR CIO(12/30/13) BP Exploration(Alaska) • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,October 28,2015 TO: Jim Regg P.I.Supervisor Z t 13 I I' SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. L-215 FROM: Jeff Jones BAY UN ORIN L-215 114E© (.) 6 ,),ij; Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry :J NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UN ORIN L-215 API Well Number 50-029-23274-00-00 Inspector Name: Jeff Jones Permit Number: 205-127-0 Inspection Date: 10/18/2015 Insp Num: mitJJ151020161516 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well L-215 - 1TypeInj 7 W `TVD 4268 jTubing 577 - 578 580 580 • PTD 2051270 - IType Test SPT Test psi 1500 ' IA 1047 2502 - 2466 - 2460 • Interval 4YRTST IP/F P ' OA 506 . 507 - 508 508 - Notes: 1.4 BBLS diesel pumped. I well inspected,no exceptions noted. -- Wednesday,October 28,2015 Page 1 of 1 • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. o~Q ~ - ~ ~ ~ Well History File Identifier Organizing (done) RE CAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: BY: Maria Project Proofing BY: Maria ~_ Scanning Pyre-p-a-r~ation BY: ~ Maria 1 ~r.o,~d iiiimmiuuui DIGITAL DATA ~iskettes, No. ^ Other, No/Type: Date: Date: ____~_ x 30 = Date: I ~-. I Production Scanning Re,~a„~eea.o iiiimimiiiuii OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable} ^ Logs of various kinds: ~o~~a, w~ P iuimiumiim ~, n1 P + ~- =TOTAL PAGES__~ (Count does not include cover sh et) , ^ , I /s/ V r Stage 1 Page Count from Scanned File: ~ S (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES _ BY: Maria Date: f ~.~ 111 7 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO /s/ ~n/~ N/NO { BY: Maria Date: !s/ Scanning is complete at this point unless rescanning is required. III Ilflll III II II III Rescanned II I II II II I I Ill l l !ll BY: Maria Date: /s/ Comments about this file: Quality Checked III II~III III II'I III 10/6/2005 Well History File Cover Page.doc SGhl~llpl~~l`~eP Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # .. .?r"'.~ ;~ :~ 2011() ~a a s" - Log Descriotinn NO. 5447 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 C C~ .-.---__-'._.- a___~~_ r J ~ ..._ ~~ ~~. r~ ~~ _ ~~~ 'i~~~N FEa ~ ~ 201 ~...~~,niwai va[a tenter LR2-1 Alaska Data & Consulting Services 900 E. Benson Blvd. 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, December 03, 2009 To: Jim Regg c / P.I. Supervisor ~ ( 12 ~3l u ~ SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA)1NC L-21s FROM: gob Noble PRUDHOE BAY UN GRIN L-215 Petroleum Inspector Src: Inspector NON-CONFIDENTIAL • Reviewed By: P.I. Suprv JP,~ Comm Well Name: PRUDHOE BAY UN ORIN L-215 API Well Number: 50-029-23274-00-00 Inspector Name: Bob Noble Insp Num: mitRCN091202064706 Permit Number: 205-127-0 Inspection Date: 11/30/2009 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well r L-z1s Type Inj. ~ ~'/ ~ TVD ~ az6s ~ IA ~ ~ ~s7o ~ zoso 960 --1960 .~ -~--- --- ------ - --+- - ---- T-- , 1------1<---- P.T.D zoslz~o TypeTest ' SPT Test psi zo3o OA -~--~------ i --1-- L - -- to to - ~ I t o to 1690 ~ ~ Interval a~TST - P/F P - Tubing, ---- -~ 1690 ~ 1690 ----- ~--- -~ 1690 ---- _L-----~---- ~- -- Notes: l~l i /~ . i e J U t ~'~G~" -~c° S~- ~~ SS ~~r2 = 1 So ups Thursday, December 03, 2009 Page 1 of 1 ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 ~~~~,i~.~u~~~ ''"~ f ~~ ~ ~~~~ 't ~ bp ~~~~`~~~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB L-Pad Dear Mr. Maunder, 0 C T 0~ 2009 ~Ilask~ ~ii ~ Gas Cons. Ca~i~~ion Anchcrage ~~,~ ~ ` ~' ~~ ~ ~ ~~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB L- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska ) Inc. ! Surface Casing by Conductor Mnulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) I~A}P L pad R/1'i/2009 Well Name PTD # API # IniGal to of cement Vol. of cement um ed Final top of cement Cement top oH date Corrosion inhibitor Corrosion inhibitod sealant date ft bbls ft na al L-Ot 2010720 50029230110000 NA 6 NA 61.2 6/25/2009 L-02A 2041490 50029230480100 NA 1.4 NA 14.5 6/27/2009 L-03 2051030 50029232690000 NA 2.8 NA 24.7 6/25/2009 L-04 2061200 50029233190000 NA 1.7 NA 15.3 6/25/2009 L-100 1980550 50029228580100 NA 6.2 NA 57.8 6l29/2009 1-101 1980320 50029228650000 NA 3.3 NA 30.6 6/29/2009 L-102 2020360 50029230710000 37' NA Need To Job? NA L-103 2021390 50029231010000 NA 1.6 NA 10.2 6/26/2009 L-104 2012380 50029230600000 NA 3.5 NA 47.6 5/6/2009 L-105 2020580 50029230750000 NA 1.75 NA 24.65 5/6/2009 L-106 2012230 50029230550000 NA 2.75 NA 28.05 5/6/2009 L-107 2011510 50029230360000 NA 4.8 NA 57.8 5/6/2009 L-108 2021090 50029230900000 NA 12 NA 13.8 6/25/2009 L-109 2012010 50029230460000 NA 2.9 NA 32.3 6l27/2009 L-110 2011230 50029230280000 NA 27 NA 316.2 6/29/20p9 L-111 2020300 50029230690000 NA 4.7 NA 54.4 6/29/2009 L-112 2022290 50029231290000 NA 5.5 NA 51 6/27/2009 L-114A 2051120 50029230320100 NA 2.5 NA 25.5 6/29/2009 L-115 2011400 50029230350000 NA 0.5 NA 3.4 6/27/2009 L-116 2011160 50029230250000 NA 5 NA 54.4 6/28/2009 L-117 2011670 50029230390100 NA 2.9 NA 28.9 6/27/2009 L-118 2011870 50029230430000 NA 1.4 NA 15.3 6/27/2009 L-119 2020640 50029230770000 NA 2.25 NA 28.9 5/6/2009 L-i20 2020060 50029230640000 NA 0.75 NA 6.8 5/5/2009 L-121A 2030390 50029237380100 NA 2.2 NA 25.5 6127/2009 L-122 2030510 50029231470000 NA 2 NA 20.4 6/27/2009 L-123 2051940 50029232900000 NA 2 NA 18.7 6/27/2009 L-124 2050430 50029232550000 NA 1.8 NA 17 6/27/2009 L-200 2040010 50029231910000 NA 1.8 NA 13.5 6/26/2009 L-201 2040460 50029232020000 NA 1.75 NA 15.3 5/6/2009 L-202 2041960 SQ029232290000 NA 2 NA 17 6/26/2009 L-204 2060920 50029233140000 NA 1.5 NA 5.95 5/6/2009 L-205 2080530 50029233880000 NA 1 NA 12.75 1/10/2009 L-210 2031990 50029231870000 NA 325 NA 31.4 5/5/2009 L-211 2040290 50029231970000 NA 1.8 NA 17 6/27/2009 L-212 2050300 50029232520000 NA 1.8 NA 17 6/26/2009 L-213 2060530 50029233080000 NA 2 NA 17 6/25/2009 L-214A 2060270 50029232580100 NA 025 NA 102 5/6/2009 L-215 2051270 50029232740000 NA 1.5 NA 30.6 5/6/2009 L-216 2040650 50029232060000 NA 1.3 NA 11.9 6/26/2009 L-217 2060750 50029233120000 late bbckin conductor NA NA L-218 2051190 50029232720000 NA 1.7 NA 15.3 6/27/2009 L-219 2071480 50029233760000 surface NA NA L-220 2080470 50029233870000 NA 2 NA 20.4 6/28/2009 L-221 2080310 50029233850000 NA 1.7 M1fA 16.2 6/25/2009 L-250 2051520 50029232810000 NA 3.4 NA 34 6/26/2009 L-50 2051360 50029232770000 NA 1.8 NA 20.4 6/27/2009 L-51 2060590 50029233090000 NA 1.8 NA 17 6/27/2009 osn s/os ~cblumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Wall _Ini. /k N0.4887 Company: State of Alaska Alaska Oil & Gas Cons Comm t" ~ ; ~ ~~ y^-~~~~ ~~ ~ ~ ~0~`$ Attn: Christine Mahnken a~ ~y,~ ~ ~ ,~ LU i1 333 West 7th Ave, Suite 100 Anchorage, AK 99501 . n.. M-04 11978480 MEM GRADIOMANOMETER LOG ~ ~ 08/25/08 1 1 14-32 12031498 LDL - 07/29/08 1 1 H-20 11962621 USIT ' ~j - "° ~- L~ 08/28/08 1 1 3-35/L-36 11999039 INJECTION PROFILE 09/04/08 1 1 3-37/L-35 11970845 FLUID LEVEL DETERMINATIONU ~5' ( 09/07/08 1 1 3-37/L-35 11968960 PRODUCTION PROFILE G 08/30/08 1 1 NK-38A 12017515 SBHP SURVEY '~~ .-. A (~,~ 09/02/08 1 1 L-215 12031512 INJECTION PROFILE _ '~ ~ 09/03!08 1 1 B-05B 12096914 MCNL 08/17/08 1 1 L-205L3 40016965 OH MWD/LWD EDIT 06/21/08 2 1 ---• ..... ....v~.r . ~.w ~,, ~.v n~c. Iv n,~,~V VJ7G VVr'1 CNlil'1 ~ V: BP Exploration (Alaska) Inc. ' ~Mw~ ( tti ~s` ~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ?~?~~..~" ('', ~•'(~(1~~ Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2 8 ATTN: Beth ~ Received by: il~~ • DATA SUBMITTAL COMPLIANCE REPORT 10/29/2007 Permit to Drill 2051270 Well Name/No. PRUDHOE BAY UN ORIN L-215 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23274-00-00 MD 9020 TVD 4874 Completion Date 9/28/2005 Completion Status 1WINJ Current Status 1WINJ ~ UIC Y~,.- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes ~. DATA INFORMATI ON Types Electric or Other Logs Run: MWD / GR, MWD / GR /RES /DEN / NEU / PWD, MWD / GR /RES, (data taken fro m Logs Portion of Master Well Data Maint Well Log Informat ion: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D Asc Directional Survey 0 9020 Open 10/13/2005 IIFR Rpt Directional Survey 0 9020 Open 10/13/2005 IIFR D D Asc Directional Survey 0 4279 Open 10/13/2005 IIFR PB 1 Rpt Directional Survey 0 4279 Open 10/13/2005 IIFR PB 1 D Asc Directional Survey 0 12600 Open 10/13/2005 IIFR PB 2 Rpt Directional Survey 0 12600 Open 10/13/2005 IIFR PB 2 wog Cement Evaluation 5 Col 1 4800 8834 6/14/2006 USIT, CE 26-Sept-2005 ~,L~og Injection Profile 5 Blu 1 7900 8460 Open 7/25/2006 Injection Profile SPIN, '~ PRES, TEMP, CCL, GR, RST 18-Apr-2006 "*REVISED*"~ ' ED C Lis 15373 Gamma Ray 55 4280 Open 8/27/2007 LIS Veri, GR, ROP w/PDS Graphics ~ ED C Lis 15373 Induction/Resistivity 55 9023 Open 8/27/2007 LIS Veri, GR, ROP, FET, DRHO, NPHI w/Grpahics wog 15373 Induction/Resistivity 25 Blu 108 9020 Open 8/27/2007 MD Vision Service Final 22-' Sep-2005 ', dog 15373 Induction/Resistivity 25 Blu 108 9020 Open 8/27/2007 TVD Vision Service Final / 22-Sep-2005 D C Lis 15374rit'nduction/Resistivity 4946 8838 Open 8/27/2007 LIS Veri, USIT, CCL w/Graphics og ~~/ Inert' esistivity ~ ~\ 25 Blu 108 4279 Open 8/27/2007 PB1 MD Vision Service Final 9-Sep-2005 / `Log Induct' ~ tivity ~ 1~ 25 Blu 108 4279 Open 8/27/2007 PB1 TVD Vision Service Final 9-Sep-2005 C Lis 15375 ~nduction/Resistivity 55 12600 Open 8/27/2007 PB2 LIS Veri, ROP, GR, FET w/Graphics in PDS i DATA SUBMITTAL COMPLIANCE REPORT 10/29/2007 Permit to Drill 2051270 Well Name/No. PRUDHOE BAY UN GRIN L-215 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23274-00-00 MD 9020 TVD 4874 Completion Date 9/28/2005 Completion Status 1WINJ Current Status 1WINJ UIC Y q -___ _ _...._. C'X`og _.. .. _. _. _ 15375 .-_ _- ~... --- __ ... __... _.._._ Ind~~jor}( §is ty ..__ - _ -- _- __ -__- 25 Blu 108 12600 Open 8/27/2007 PB2 MD Vision Service 17- ~~ ,~' ~ ^ Sep-2005 L/Log 15375 Induction/+~esi~tiJity . ~.,.,_ _. _......._..~. 25 Blu 108 12600 Open 8/27/2007 PB2 ND Vision Service ~ ___.- 17-Sep-2005 Well Cores/Samples Information: Name Sample Interval Set Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? YL% Daily History Received? ~ N re. Chips Received? •-'"'P'71Q~ Formation Tops ~~ N Analysis ~'-f-Ri- Received? Comments: Compliance Reviewed By: Date: oens/o7 C Schlura~erger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO. 4372 Company: Alaska Oil 8 Gas Cons Comm ANn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Aurora Date BL Color CD S-121 40013524 OH EDIT MWD/LWD 05/26106 2 1 5-121PB7 40013524 OH EDIT MWD/LWD 05/17106 2 1 L-215 L-215P81 40012404 40012404 OH EDIT MWD/LWD OH EDIT MWDILWD r,) ~ 09/22/05 09109105 2 2 1 1 L-215P82 40012404 OH EDIT MWD/LWD - j 09/17/05 2 1 V-218 11637325 CH EDIT PDC GR USIT 04/11/07 1 L-215 10913049 CH EDIT PDC GR USIT 09/26/05 1 PLEASE ACKNOWLEDGE RECEIPT BV SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. = '~` '~ Petrotechnical Data Center LRS 1 3` 900 E Benson Blvd, a 1. ~+. ~^+~--^ ~- "'^^"a ~" Anchorage AK 99508-4254 Aa !~' ~ `~ ~#'lfi7 Date Delivered: + .9 - 1* Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: 06/28/O6 Sehiumberger Sehlumberger-DCS 2525 Gambell St, SuRe 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO. 3873 Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion, Aurora, Borealis, Polaris Date BL Color CD V-212 11225953 INJECTION PROFILEMiFL 04/08106 1 L-212 11217240 INJECTION PROFILE 04/16106 1 L-216 11217241 INJECTION PROFILE 04f17f06 1 L-215 11217242 INJECTION PROFILE 04/18/06 1 V-213 REDO 11076450 INJECTION PROFILE 07101/05 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: / / .. ~ / (~ lr~, 'l Schfumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: _ - C7 • f ~! Sc~~t~~erger ~~,~ _ ~ 7~ ~~ ~' ~ Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job M Log Description NO. 3938 Company: Alaska Oi18 Gas Cons Comm ANn: Christine Mahnken 333 West 7th Ave, Suite 700 Anchorage, AK 99501 Field: Orion Borealis Date BL Color CD L-200L2 49010090 OH LDWG EOIT OF MWDILWD 02N 8/04 2 1 Z-108- 11225977 SCMT O6/04/06 t L-214A 11277230 USIT 03N 6/O6 1 L-275 10813049 USIT 09/28/05 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: 4.,.i_ : l1 /~'~ ~ (~~ ) Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 f~ ATTN: Beth r, J Received by: l %., l .a.-°~-'~- ~c~.~v~a Jt~N 1 4 ?_Ot~6 ~ilca Chi! & Cis Cons. C~,mmis~i~rr Ane.~~rag~ 06,09,06 • MEMORANDUM ~ State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, November 30, 2005 TO: Jim Regg '"~ - ---P-.I. Supervisor-~' -LZ~ ~~~ ____._--SUBJECT:. Mechanical Integrity_Tests_____- - ( ( BP EXPLORATION (ALASKA) INC L-215i FROM: Chuck Scheve PRUDHOE BAY UN ORIIQ L-215i Petroleum Inspector Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~~- Comm Well Name: PRUDHOE BAY UN ORIN L-215i Insp Num: mitCS051129160948 Rel Insp Num API Well Number 50-029-23274-00-00 Permit Number: 205-127-0 Inspector Name: Chuck Scheve Inspection Date: 11/28/2005 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. `7~/ei1 L-21S~ ,'T'ype Tn~, W TVD 4268 IA i 1100 2010 1960 1960 i p.T 2osiz~o TypeTest SPT ; Test psi 106 i OA I 220 ~ zso 260 260 Interval IAlITAL prn, P Tubing 950 ~, 950 , 950 I 950 Notes Wednesday, November 30, 2005 Page 1 of 1 STATE OF ALASKA ALASKA 1L AND GAS CONSERVATION COMION~ ~~ WELL COMPLETION OR RECOMPLETION REPORT AND LO~~, ~9 _ ~ _ , 1a. Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 20AAC 25.105 20AAC 25.110 ^ GINJ ®WINJ ^ WDSPL No. of.Com letions One P Other ib. Well.. ~ ~; ^ Development ^ Exploratory ^ Stratigraphic ®Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 9/28/2005 12. Permit to Drill Number 205-127 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 9/8/2005 13. API Number 50-029-23274-00-00 4a. Location of Well (Governmental Section): Surface: 2594' FSL 3603' FEL SEC 4 T1 R 7. Date T.D. Reached 9/22/2005 14. Well Name and Number: PBU L-2151 , , , 11 E, UM . 3 2N, Top of Productive Horizon: 1649' FSL, 662' FWL, SEC. 26, T12N, R11 E, UM 8. KB Elevation (ft): 78.3' 15. Field /Pool(s): Prudhoe Bay Field / Orion Schrader Bluff Total Depth: 2393' FSL, 1226' FWL, SEC. 26, T12N, R11E, UM 9. Plug Back Depth (MD+TVD) 8912 + 4818 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 5 83311 y- 5978317 Zone- ASP4 10. Total Depth (MD+TVD) 9020 + 4874 Ft 16. Property Designation: ADL 028238 _ _ __ TPI: x- 587519 y- 5982700 Zone- ASP4 Total Depth: x- 58807 Y- 5983450 Zone- ASP4 3 11 • Depth where SSSV set N/A MD 17. Land Use Permit: . _ 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900 (Approx.) 21. Logs Run: MWD / GR, MWD / GR /RES /DEN /NEU / PWD, MWD / GR /RES, DEN /NEU, USIT 2. CASING, LINER AND CEMENTING RECORD (:.ASING ETTING EPTH MD ETTINCi EPTH TVD HOLE OUNT SIZE WT. PER FT. GRADE OP TTOM OP TTOM $IZE CEMENTING RECORD PULLED 20" 166.4# X-56 Surface 109' Surface 109' Driven 60 sx Arctic Set A rox. 9-5/8" 40# L-80 29' 4226' 29' 2698' 12-1/4" 32 sx AS Lite, 379 sx Class 'G' 7" 26# L-80 25' 8998' 25' 4863' 8-3/4" 147 sx Class 'G', 384 sx Class 'G' 23. Pertorations open to Produc B I tt S tion {MD + TV D of Top and " " 24. TUBING RECORD om o nterval, ize and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 5 spf 3-1/2", 9.2#, L-80 8512' 7884', 8114', 8281', 8480' MD TVD MD TVD 7970' - 8005' 4311' - 4329' 8210' - 8270' 4437 -4470' 25. ACID, FRACTURE,. CEMENT SQUEEZE, ETC. 8330' - 8395' 4503' - 4538' 8420' - 8440' 4551' - 4562' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 8625' - 8710' 4885' - a711' Freeze Protect w/ 113 Bbls of Diesel 26. PRODUCTION TEST Date First Production: October 10, 2005 Method of Operation (Flowing, Gas Lift, etc.): Water Injection Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS'MCF WATER-BBL CHOKE $IZE GAS-OIL RATIO Flow Tubing PreSS. Casing Pressure CALCULATED 24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27• CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit re chips; if none, state "none". ~f, is __ . .~If ; ~3 ~~~.w QC~ ~ 2D05 None `' 1~ f `~a i- Form 10-407 Revised 12/2003 CONTINUED ON REVERSE $IDE ,~ 28 GEOLOGIC MARKERS 29' ORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Ugnu 4790' 2946' None Ugnu MA 7399' 4049' Ugnu MBi 7481' 4086' Ugnu M62 7651' 4162' Ugnu MC 7859' 4256' Top of Schrader Bluff NA 7916' 4284' Schrader Bluff NB 7973' 4313' Schrader Bluff NC 8052' 4354' Schrader Bluff OA 8212' 4438' Schrader Bluff OBa 8327' 4501' Schrader Bluff OBb 8422' 4552' Schrader Bluff OBc 8519' 4606' Schrader Bluff OBd 8614' 4659' Schrader Bluff OBe 8741' 4728' Schrader Bluff OBf 8826' 4773' Base of Schrader Bluff OBf 8917' 4821' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed { ~ Titl T h i ~ ~/ i l A D .. o e n ec ca ss stant ate Terrie Hubble PBU L-2151 205-127 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A royal NO. Drilling Engineer: John Rose, 564-5271 INSTRUCTIONS GeNeaAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Keliy Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate °None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Printed: 10/3/2005 3:03:28 PM r BP EXPLORATION Page 1 of 13 Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date '! From - To Hours ' Task I! Code I'~, NPT - - 9/7l2005 ~ 00:00 - 02:00 ~ 2.00 MOB , P 02:00 - 09:00 7.00 MOB P 09:00 - 13:00 4.00 RIGU P 13:00 - 16:00 3.00 RIGU P 16:00 - 16:30 0.50 RIGU P 16:30 - 20:30 4.00 RIGU P 20:30 - 21:00 0.50 RIGU P 21:00 - 21:30 0.50 RIGU P 21:30 - 00:00 2.50 DRILL P 9/8/2005 00:00 - 00:30 0.50 DIVRTR P 00:30 - 01:00 0.50 DRILL P 01:00 - 02:30 1.50 DRILL P 02:30 - 03:00 I 0.501 DRILL I P 03:00 - 04:15 I 1.251 DRILL I P 04:15 - 05:00 0.75 DRILL P 05:00 - 08:00 3.00 DRILL P 08:00 - 08:30 0.50 DRILL P 08:30 - 09:00 0.50 DRILL P 09:00 - 12:15 3.25 DRILL P 12:15 - 12:45 0.50 DRILL P 12:45 - 13:15 0.50 DRILL P 13:15 - 17:45 I 4.501 DRILL I P 17:45 - 18:15 0.50 DRILL P 18:15 - 19:00 0.75 DRILL P Spud Date: 9/10/2005 Start: 9/7/2005 End: 9/28/2005 Rig Release: 9!2812005 Rig Number: Phase Description of Operations PRE PJSM. Pull pits away from the rig. Move the rig off of L-218 and spot in the middle of the pad. PRE Install side cellar doors and weld into place. NU the diverter line. Accept the rig @ 0730 hours 9/7/2005. PRE Lay mats, pit liner and riser. Move sub over L-215 and spot in place. Spot the pit complex and hook up all the lines. PRE Take on spud mud into the pits. NU the diverter system. Berm in the cellar. PRE RU the rig floor to PU drill pipe. PRE PU 4" DP and stand back in the derrick. PU HWDP and stand back in the derrick. PU jar stand and stand back in the derrick. PRE Service the top drive and blocks. PRE PU stand of NMDC's and stand back in the derrick. SURF MU 12-1/4" BHA#1 to 108'. SURF Function test the diverter -good. Witness of the test was waived by Lou Grimaldi of the AOGCC. SURF RU the Sperry E-line sheave in the derrick to run Gyrodata 9Yro. SURF Drill 12-1/4" ahead from 108' to 267'. ART - 0.95. Circulate hole clean and orient tool face. SURF POH and pick up Jar stand of BHA#1. BHA#1: 12-1/4" MXC-1(RR), 9-5/8" motor - 1.83 - 4.5 stg - 3/4 w/float sub, NM Lead Collar, NM Stabilizer, MWD, NM Stabilzer, NM XO, UBHO, 3 x NM DC's, Saver Sub, 5" HWDP, Jar, 5" HWDP, 4" HT40 XO. SURF RIH with jar stand. Tag fill at 240'. POH and LD 1 joint of 5" HWDP from jar stand. RIH with stand of 4" HWDP, wash and drill down to 280'. Circulate hole clean. POH to 230'. RIH with pumps off -tag fill at 260'. Wash and drill to 295'. Circulate hole clean. POH to 240'. RIH with pumps off and tag bottom at 295'. POH and stand back 4" HWDP. PU single 5" HWDP on top of jars and RIH to 267`. SURF RIH w/ Gyrodata gyro and take surveys. SURF PU stand of 4" HWDP. Wash and ream to 295'. Dir drill ahead with 4" HWDP from 295' to 730'. ART - 0.51, AST - 1.5, PU - 70K, SO - 66K, ROT - 68K, 580 gpm, 1,400 psi on bottom, i ,030 psi off bottom, TO on - 4.5K, TO off - 2.5K at 50 rpm. SURF Circulate bottoms up - 580 gpm, 1,030 psi. SURF RIH w/ Gyrodata gyro and take surveys. SURF Dir drill ahead with 4" HWDP and 4" DP from 730' to 1,100'. ART - 0.75, AST - 1.44, PU - 70K, SO - 66K, ROT - 68K, 580 gpm, 1,400 psi on bottom, 1,330 psi off bottom, TO on - 3K, TO off - 2.5K at 50 rpm. SURF Circulate bottoms up - 580 gpm, 1,330 psi. SURF RIH w/ Gyrodata gyro and take surveys. RD Gyrodata and Halliburton E-line. SURF Dir drill ahead with 4" DP from 1,100' to 1,566'. ART - 0.5, AST - 3.03, PU - 80K, SO - 65K, ROT - 68K, 680 gpm, 2,145 psi on bottom, 1,950 psi off bottom, TO on - 4K, TO off - 2.5K at 50 rpm. SURF Circulate bottoms up - 680 gpm, 1,970 psi, 60 rpm. SURF POH to changeout bit and adjust motor bend from 1,566' to 270' standing back 4" DP, HWDP. Work pipe across tight Printed: 10/3/2005 3:03:35 PM .J BP EXPLORATION Operations Summary Report Page 2 of 13 Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: Date ', From - To Hours I Task ~ Code NPT ~ Phase _ _ 9/8/2005 18:15 - 19:00 0.75 DRILL P SURF 19:00 - 20:00 1.00 DRILL P SURF 20:00 - 20:30 I 0.501 DRILL I P 20:30 - 21:00 0.50 DRILL P 21:00 - 21:30 0.50 DRILL P 21:30 - 22:30 I 1.001 DRILL I P 22:30 - 00:00 ~ 1.50 ~ DRILL ~ P 9/9/2005 100:00 - 09:30 I 9.501 DRILL I P 09:30 - 10:30 I 1.001 DRILL I P 10:30 - 15:30 5.00 DRILL P 15:30 - 17:30 2.00 DRILL P 17:30 - 23:00 5.50 DRILL P 23:00 - 00:00 1.00 DRILL P 9/10/2005 00:00 - 03:30 3.50 DRILL P 03:30 - 12:00 I 8.501 DRILL I P 12:00 - 16:00 I 4.001 DRILL I P Description of Operations spots at 1,455' and 1,030'. Stand back jar stand and drill collars. Break out and LD UBHO sub and bit. 12-1/4" MXC-1(RR) graded: 213/1NT/A/E11 /CT/BHA MU new 12-1/4" MXC-1 and adjust motor to 1.5 degree bend - BHA#2. Orient motor to MWD. Service the top drive, crown and blocks. Continue to MU and RIH with BHA#2 to 274'. BHA#2: 12-1/4" MXC-1, 9-5/8" motor - 1.5 - 4.5 stg - 3/4 w/float sub, NM Lead Collar, NM Stabilizer, MWD, NM Stabilzer, NM XO, 2 x NM DC's, NM Stabilizer, 1 x NM DC, Saver Sub, 5" HWDP, Jar, 5" HWDP, 4" HT40 XO. RIH with BHA#2 on 4" HWDP and 4"DP from 274' to 1566'. Wash and ream the last stand to bottom. Worked pipe across tight spots at 1,440' and 1,030'. Dir drill ahead with 4" DP from 1,566' to 1,663'. ART - 0.19, AST - 0.42, PU - 81 K, SO - 66K, ROT - 68K, 680 gpm, 2,289 psi on bottom, 2,040 psi off bottom, TO on - 5K, TO off - 3K at 50 rpm. Dir drill ahead with 4" DP from 1,663' to 3,349'. PU - 93K, SO - 60K, ROT - 77K, 680 gpm, 3,380 psi on bottom, 2,920 psi off bottom, TO on - 8K, TO off - 5k. AST - 3.51, ART - 3.85 Noise interference with the MWD sensors. Clean mud pump screens and add nitrogen to the dampner. Dir drill ahead with 4" DP from 3,349' to 4,279'(TD). PU - 100K, SO - 64K, ROT - 81 K, 680 gpm, 3,430 psi on bottom, 3,340 psi off bottom, TO on - 9K, TO off - 6k. AST - 0.95, ART - 1.99. Circulate and condition the mud for wiper trip to the 4" HWDP. Monitor the well -stable. POH from 4,279' -trying to swab. Line up and backream out of the hole to 3,905, PU - 115k, SO - 60K, ROT - 70k, 80 rpm, TO - 7k. Shut off the pumps and the rotary and pull pipe from 3,905' to 2,140' -well starting to swab and pull tight +30k. RIH to 2,220. Backream out to 1,950'. Pull free to 1,170'. Started to swab. Pump out to 990'. Pull tree to 917'. RIH from 917' and tag up at 2,145'. Hit obstruction at -2,145' while running in the hole after the wiper trip to the 4" HWDP. Attempt to work past without success. Engage pumps at 200 gpm and rotary at 45 rpm and attempt to work past without success. Gradually increased the rate to 600 gpm and worked past, but inadvertantly kicked off at 2,145'. Dir drill to 2,223' in an attempt to find original hole without success. Surveys confirmed openhole sidetrack of the well at -2,145'. Directionally drill open hole sidetrack from 2,145' of the original hole to 3,287', PU - 100k, SO - 67k, ROT - 79k, 700 gpm, 2,900 psi on bottom, 2,740 psi off bottom, 80 rpm, TO on - 7k, TO off - 4k, AST - 1.48, ART - 4.67. Directionally drill open hole sidetrack from 3,287' to 4,236'(TD), PU - 115k, SO - 67k, ROT - 82k, 680 gpm, 3,340 psi on bottom, 3,100 psi off bottom, 80 rpm, TQ on - 7k, TQ off - 6k, AST - 1.38, ART - 2.41. SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF Printed: 10/3/2005 3:03:35 PM BP EXPLORATION Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date '~ From - To ~ Hours ~~~ Task ~! Code ~I NPT ~~ 9/10/2005 16:00 - 18:00 18:00 - 22:30 22:30 - 00:00 9/11/2005 00:00 - 01:30 01:30 - 04:00 04:00 - 06:00 06:00 - 08:30 08:30 - 09:00 09:00 - 12:00 12:00 - 19:00 19:00 - 21:30 21:30 - 22:00 22:00 - 00:00 9/12/2005 100:00 - 01:40 2.00 DRILL P 4.50 DRILL P 1.50 DRILL P 1.50 DRILL P 2.501 DRILL I P 2.00 DRILL P 2.50 DRILL P 0.50 DRILL P 3.00 CASE P 7.001 CASE I P 2.50 CASE P 0.50 CASE P 2.00 CEMT P 1.67 CEMT P Start: 9/7/2005 Rig Release: 9/28/2005 Rig Number: Phase Page 3 of 13 Spud Date: 9/10/2005 End: 9/28/2005 Description of Operations SURF Circulate and condition the hole with 3 x bottoms up - 665 gpm, 3,200 psi, 110 rpm, TO - 6.5k. SURF POH from 4,236' to 3,438' with the hole trying to swab. Worked pipe from 3,438' to 3,282'. Overpulled +30k at 3,282'. Pump out from 3,282' to 3,232, 500 gpm, 1,800 psi. POH without pumps from 3,232' to 2,130. RIH to 2,223'. Pump out over potential trouble area from 2,223' to 1,849', 670 gpm, 2,190 psi. POH from 1,879' to 1,755' -swabbing. Pump out from 1,755'to 1,103', 670 gpm, 2,050 psi. SURF RIH from 1,103' to 2,036'. Work pipe to 2,223' and tag up. Engage pumps and ensure BHA oriented high side. Take MWD survey to confirm entry into sidetracked hole -confirmed. Worked pipe from 2,223' to 2,326' with pumps on at 85 gpm, 600 psi. Take another survey to reconfirm entry into sidetracked hole -reconfirmed. SURF RIH from 2,326'. Had to work the pipe over numerous spots while RIH. Each time, engaged the pumps at 80 - 100 gpm, -600 psi to get past. BHA still oriented high side. Tight spots seen at 2,340', 2,407', 2,680', 2,758', 3,050', 3,438', 3,850'. Wash the pipe to bottom from 3,900' to 4,236'. SURF Circulate and condition the hole and the mud to run casing - 650 gpm, 3,400 psi, 110 rpm. SURF Monitor well -stable. POH from 4,236' to 1,009'. SURF Stand back 8 stands of 4" HWDP and jar stand. LD BHA#2. 12-1/4" MXC-1 graded: 2/3/CT/M/E/I/ER/TD. SURF Clean and clear the floor. SURF Hold PJSM for running casing. RU 350 ton casing equipment and make a dummy run with the split landing joint. RU the circulation and fill up tool. SURF PU 9-5/8" 40# L-80 BTC casing. Torque each connection to 9,000# utilizing Best-o-life 2000NM thread lubricant. The float equipment has been Bakerlok'd. RIH working pipe across obstructions observed at 2,131', 2,475', 2,605', 2,734'. MU hanger and land. PU - 160k, SO - 85k. SURF Circulate and condition the mud for the cement job with the fillup tool. Work the pump rate up to 8 bpm, 553 psi while reciprocating -12'. PU - 185k, SO - 80k. SURF LD the circulation and fillup tool and RU the cement head. SURF Hold PJSM. Line up to Schlumberger and pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi. Bleed off pressure and batch up 10 ppg Mudpush II spacer. Pump 73 bbls of spacer at 5 bpm, ICP - 105 psi, FCP - 82 psi. Shut down, drop bottom plug and batch 10.7 ppg ArcticSet Lite lead slurry. Pump 480 bbls of lead cement at 7.5 bpm, ICP - 180 psi. SURF Pump remaining 20 bbls of lead cement (500 bbls total) at 7.5 bpm, FCP - 475 psi. Batch up 15.8 ppg Class G tail slurry. Pump 79 bbls of tail slurry at 5 bpm, ICP - 300 psi, FCP - 280 psi. Pipe was reciprocated until 35 bbls of tail slurry pumped away. Shut down, drop top plug and displace with 10 bbls of fresh water. Shut down and swap lines from Schlumberger to the rig. Displace with mud using the rig at 8 bpm, ICP - 410 psi. At 88 bbls into the displacement, the hole packed off and Printed: 10!3/2005 3:03:35 PM BP EXPLORATION Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date From - To !, Hours '~ Task ,Code '~, NPT - - _--- 9/12/2005 00:00 - 01:40 ~ 1.67 ~ CEMT ~ P Start: 9/7/2005 Rig Release: 9/28/2005 Rig Number: Page 4 of 13 Spud Date: 9/10/2005 End: 9/28/2005 Phase ; Description of Operations SURF 01:40 - 02:30 I 0.831 CEMT I P I I SURF 02:30 - 06:30 4.00 CASE P SURF 06:30 - 11:30 5.00 BOPSU P SURF 11:30 - 14:30 3.00 BOPSU P SURF 14:30 - 19:00 4.50 DRILL P PROD1 19:00 - 20:30 1.50 DRILL P PROD1 20:30 - 22:00 1.50 DRILL P PRODi 22:00 - 23:00 1.00 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PRODi 9/13/2005 00:00 - 01:00 1.00 DRILL P PRODi 01:00 -04:00 3.00 DRILL P PROD1 04:00 - 07:00 3.00 DRILL P PRODi 07:00 - 07:45 0.75 CASE P SURF 07:45 - 09:30 ~ 1.75 ~ DRILL P ~ PROD1 09:30 - 10:00 0.50 DRILL P PRODi 10:00 - 11:00 1.00 DRILL P PROD1 11:00 - 12:00 1.00 DRILL P PROD1 12:00 - 00:00 12.00 DRILL P PROD1 lost returns. The pipe was moved off or the hanger and returns were regained with a minimal amount of fluid lost (<5 bbls). Rate was reduced to 4.5 bpm while thicker fluid came to the surface and while trying to get the hanger to land back on the ring, -4" off the landing ring. Throughout the rest of the cement job, attempted to get the hanger to land without success, FCP - 700 psi. Bumped the plug with 305 bbls pumped and 1,200 psi, 97% efficiency. Check floats -holding. Except for the small packoff, had full returns throughout the cement job. 163 bbls of good cement returned. Hanger -4" off of landing ring. CIP C~3 0140 9/12/2005. LD cement head. LD landing joint. Clean and clear the rig floor. ND diverter and surface hydril. NU casing head and tubing spool and test to 1,000 psi -good. NU BOPE. RU rig floor to test BOPE. Install the test plug and fill the stack with water. Test BOPE and all associated valves to 250 psi / 4,000 psi. Test the annular preventer to 250 psi / 3,500 psi. Witness of the test was waived by John Spaulding of the AOGCC. Witness of the test performed by Chris Clemens -Nabors, Alan Madsen - BP. Install wear ring and blow down surface lines. PU 4" HT-40 DP to 3,900'. Cut and slip drilling line. Service the top drive, crown and blocks. POH standing back 4" DP from 3,900'. PU 4" DP to 1,587'. POH standing back 4" DP from 1,587'. Continue POH standing back 4" DP from 1,587'. PJSM. PU BHA#3 and RIH. BHA#3: 8-3/4" Hycalog DSX619M-D1, 6-3/4" motor w/ 1.15 degree bend - 5 stages - 7/8 rotor/stator, float sub, nm stabilizer, LWD -ARC, MWD, LWD - ADN, nm DC, LWD -Provision, 1 x 5" HWDP, jar, 1 x 5" HWDP, xo, 24 x 4" HWDP and 8-3/4" ghost reamer. RIH with BHA#3 picking up 4" DP to 3,992'. PJSM. Pressure test the 9-5/8" casing. Chart and hold for 30 minutes -good test. Wash down and tag cement at 4,136. 9-5/8" float collar located at 4,139'. Drill shoe track to 4,226', rat hole to 3,236' and 20' of new hole to 4,256' - 550 gpm, 2,340 psi, 60 rpm, TQ - 6k. Start mud swap while drilling shoe track at 4,220'. Continue to displace the well over to 8.8 ppg LSND fluid. Pull the bit inside the surface shoe and perform LOT to 14.14 ppg EMW with 8.8 ppg fluid, 2,702 TVD, and 750 psi surface pressure. Chart and hold for 30 minutes. Circulate and condition mud. Obtain benchmark ECD - 9.38 PPg• Control drill ahead directionally to keep ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 4,256' to 5,867' - PU - 120k, SO - 70k, ROT - 93k, 580 gpm, 100 rpm, TO on 8k, TO off - 7k, 2,115 psi on bottom, 2,053 psi off bottom, AST - 2.9, ART - 6.47, Calc ECD - 9.5 ppg, Actual ECD - 10.0 ppg. Printed: 10/3/2005 3:03:35 PM • BP EXPLORATION Operations Summary Report Page 5 of 13 Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: Date '; From - To Hours Task 'Code NPT Phase Description of Operations 9/14/2005 ~ 00:00 - 02:00 ~ 2.00 ~ DRILL ~ P ~ PROD1 Control drill ahead directionally to keep ECD's < 0.6 ppg over 02:00 - 02:30 0.50 DRILL P 02:30 - 12:00 9.50 DRILL P 12:00 - 00:00 12.00 DRILL P 9/15/2005 00:00 - 09:00 9.00 DRILL P 09:00 - 09:30 0.50 DRILL P 09:30 - 12:00 2.50 DRILL N 12:00 - 13:30 1.50 DRILL P 13:30 - 14:30 1.00 DRILL P 14:30 - 00:00 9.50 DRILL P 9/16/2005 00:00 - 12:00 12.00 DRILL P 12:00 - 00:00 12.00 DRILL P calculated. Driii 8-3/4" from 5,867' to 6,280' - PU - 120k, SO - 70k, ROT - 93k, 580 gpm, 100 rpm, TO on 8k, TO off - 7k, 2,365 psi on bottom, 2,250 off bottom. Circulated Hi-visc sweep at 6,000' with little effect on ECD management. AST - 0.84, ART - 1.36 PROD1 Circulate bottoms up to reduce ECD's. Little effect seen on ECD management. PROD1 Control drill ahead directionally to keep ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 6,280' to 6,985' - PU - 124k, SO - 80k, ROT - 97k, 580 gpm, 100 rpm, TO on 7k, TO off - 6k, 2,620 psi on bottom, 2,510 off bottom. Circulated Hi-visc sweep at 6,518' with little effect on ECD management. AST - 1.7, ART - 2.41 PROD1 Control drill ahead directionally to keep ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 6,985' to 8,270' - PU - 130k, SO - 80k, ROT - 100k, 580 gpm, 100 rpm, TO on 8k, TO off - 7k, 3,240 psi on bottom, 3,030 off bottom. AST - 3.87, ART - 4.03 PROD1 Control drill ahead directionally to keep ECD's < 0.6 ppg over calculated.. Drill 8-3/4" from 8,270' to 9,134' - PU - 143k, SO - 80k, ROT - 103k, 580 gpm, 100 rpm, TO on - 9k, TO off - 8k, 3,540 psi on bottom, 3,360 off bottom, AST - 2.6, ART - 2.82. Calculated ECD - 9.83 ppg, Actual ECD - 10.42 ppg PROD1 Circulate a hi-visc sweep in an attempt to bring ECD's down. No cuttings returned to surface. ECD's prior to circulation were 0.6 ppg over calculated, ECD's after circulation were 0.58 ppg over calculated. RREP PROD1 Attempt to go back to drilling -failure of #1 gen set turbocharger. Reciprocate and circulate while repairing gen set. - 460 gpm, 2,280 psi, 65 rpm. PROD1 Control drill (<200'/hr) ahead directionally to keep ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 9,134' to 9,321' - PU - 150k, SO - 80k, ROT - 105k, 580 gpm, 100 rpm, TO on - 10k, TO off - 9k, 3,450 psi on bottom, 3,320 off bottom, AST - 0.5, ART - 0.75. Calculated ECD - 9.83 ppg, Actual ECD - 10.43 Pp9 PROD1 Circulate a weighted (+ 2 ppg) hi-visc sweep in an attempt to bring ECD's down. No cuttings returned to surface. ECD's prior to circulation were 0.6 ppg over calculated, ECD's after circulation were 0.59 ppg over calculated with 0.66 ppg seen when the sweep rounded the corner. PRODi Control drill (<200'/hr) ahead directionally to keep ECD's < 0.6 ppg over calculated. Drili 8-3/4" from 9,321' to 10,068' - PU - 158k, SO - 90k, ROT - 108k, 580 gpm, 100 rpm, TO on - 10k, TO off - 9k, 3,425 psi on bottom, 3,330 off bottom, AST - 2.5, ART - 3.8. Calculated ECD - 9.76 ppg, Actual ECD - 10.22 ppg PROD1 Drill ahead directionally keeping ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 10,068' to 11,095' - PU - 160k, SO - 70k, ROT - 110k, 575 gpm, 100 rpm, 3,750 psi on bottom, 3,460 off bottom, TO on - 10k, TO off - 9k. AST - 3.6, ART - 3.96, Calc ECD - 9.84, Actual ECD - 10.34. PROD1 Drill ahead directionally keeping ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 11,095'to 12,123' - PU - 163k, SO Printed: 10/3/2005 3:03:35 PM • BP EXPLORATION Page 6 of 13 Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: Date From - To .Hours II Task Code'. NPT ~ Phase 112:00 - 00:00 12.00 9/16/2005 DRILL P I PROD1 9/17/2005 ~ 00:00 - 04:30 4.50 ~ DRILL P ~ ~ PRODi 04:30 - 05:30 I 1.001 DRILL I P I I PROD1 05:30 - 08:30 I 3.001 DRILL I P I I PROD1 08:30 - 14:30 6.00 EVAL P PROD1 14:30 - 15:00 0.50 EVAL P PROD1 15:00 - 16:30 1.50 EVAL P PROD1 16:30 - 17:00 0.50 EVAL P PROD1 17:00 - 22:30 5.50 EVAL P PROD1 22:30 - 00:00 1.50 DRILL P PROD1 9/18/2005 00:00 - 02:45 ~ 2.75 ~ DRILL ~ P ~ PROD1 02:45 - 03:15 0.50 DRILL P PROD1 03:15 - 04:45 1.50 DRILL P PROD1 04:45 - 09:30 4.75 DRILL P PROD1 09:30 - 10:30 1.00 PXA P ABAN 10:30 - 13:30 3.00 PXA P ABAN 13:30 - 14:30 I 1.001 PXA I P I I ABAN 14:30 - 18:00 I 3.501 PXA I P I I ABAN 18:00 - 19:15 I 1.25 I PXA I P I I ABAN 19:15 - 20:30 I 1.25 I PXA I P I I ABAN Description of Operations - 65k, ROT - 105k, 580 gpm, 100 rpm, 3,640 psi on bottom, 3,615 off bottom, TO on - 12k, TO off - 11 k. AST - 2.78, ART - 3.35, Calc ECD - 9.83, Actual ECD - 10.38. Drill ahead directionally keeping ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 12,123' to 12,445' - PU - 163k, SO - 65k, ROT - 105k, 580 gpm, 100 rpm, 3,640 psi on bottom, 3,615 off bottom, TO on - 12k, TO off - 11 k. ECD's climbed to 0.7 ppg over calculated -calculated ECD - 9.79, actual ECD - 10.49. Circulate to reduce ECD's < 0.6 ppg over calculated. Drill ahead directionally keeping ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 12,445' to 12,600'(TD) - PU - 180k, SO - 62k, ROT - 103k, 580 gpm, 100 rpm, 3,890 psi on bottom, 3,865 off bottom, TO on - 14k, TO off - 12k. Calculated ECD - 9.89, Actual ECD - 10.39, AST - 2.18, ART - 2.36 MAD pass from 12,600' to 11,000' - 560 gpm, 3,450 psi, 75 rpm, TO - 10k to 13k. Conduct stationary NMR logs at 11,000' - 570 gpm, 3,420 psi. MAD pass from 11,000' to 10,400' - 560 gpm, 3,350 psi, 75 rpm, TO - 12k to 13k. Conduct stationary NMR logs at 10,400' - 570 gpm, 3,350 psi. MAD pass from 10,400' to 8,925' - 560 gpm, 3,350 psi, 70 rpm, TO - 12k to 13k. Pump out of the hole from 8,925' to 8,458', pumping a bottoms up while POH. No appreciable cuttings returned to surface. POH to 8,014' - PU - 195k, SO - 65k. POH from 8,014' to 4,129', inside the 9-5/8" surface casing shoe @ 4,226. Service the top drive, lubricate rig, top drive, crown and blocks. POH to the top of BHA#3. LD BHA#3. Stand back the 4" HWDP and the jar stand. LD Provision LW D, NM DC. PJSM download source adn LD ADN. LD MW D, ARC, NM stab, float sub, motor and bit. 8-3/4" DSX619M-D1 graded: 2/3/CT/T/X/I/BT/TD. Clear and clean the floor. RU the rig floor to handle 3-1/2" tubulars. PU 3-1/2" 9.2# L-80 IBT mule shoe and 3-1/2" 9.2# L-80 IBT work string to 1,501'. Torque connections to the mark with 2,400 ftlbs and Best-o-life 2000NM thread lubricant. Crossover to 4" HT-40 and RIH on 4" HWDP to 2,241'. RIH with stinger on 4" HT-40 DP to 4,200'. Break circulation at the surface casing shoe - 3 bpm, 150 psi, PU - 89k, SO - 61 k. RIH with stinger on 4" HT-40 DP from 4,200' to 12,508'. RU top drive and wash the last stand to bottom at 12,600'. Stage up the pumps to 500 gpm, 2,900 psi - PU - 201 k, SO - 55k Circulate a bottoms up. Hold PJSM for cement plugs while circulating. Pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi -good. Pump remaining 10 bbls of water. Pump 103 bbls of 15.8 ppg Class G cement + adds at 4 bpm, ICP - 220 psi, FCP - 70 psi. Pump 2 bbls of water behind. Swap over to the rig to displace with 9.1 ppg mud. Displace with 105 bbls (under displaced by 2 bbls), ICP - 2,800 psi, FCP Printed: 10/3/2005 3:03:35 PM • BP EXPLORATION Page 7 of 13 Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: Date 'From - To Hours 'I Task Code ~NPT Phase 9/18/2005 19:15 - 20:30 1.25 PXA P ABAN 20:30 - 21:30 1.00 PXA P ABAN 21:30 - 00:00 2.50 PXA P ABAN 9/19/2005 100:00 - 03:45 I 3.75 I PXA I P I I ABAN 03:45 - 04:30 I 0.75 I PXA (P I I ABAN 04:30 - 07:00 2.50 PXA P ~ ABAN 07:00 - 08:00 1.00 PXA P ABAN 08:00 - 09:00 I 1.00 I PXA I P I I ABAN 09:00 - 10:30 I 1.501 PXA I P I I ABAN 10:30 - 11:45 I 1.25 I PXA I P I I ABAN 11:45 - 12:30 I 0.75 I PXA I P I I ABAN 12:30 - 14:00 I 1.501 PXA I P I I ABAN 14:00 - 15:00 I 1.001 PXA I P I I ABAN Description of Operations - 2,500 psi. Open the bleed valve at the surface and verify that the plug was balanced. RD cement lines. The pipe was reciprocated throughout the entire job. CIP - 2030 hours. POH from 12,600' to 11,527' at 20-25 fpm. Circulate at 11,527', 500 gpm, 2,929 psi while reciprocating pipe -50' stroke length. Mud contaminated with cement returned to surface at 11,300 strokes into the circulation. Saw thick cement contaminated mud circulate to surface at 11,700 strokes and cleaned up by 12,700 strokes. Mud in pretty bad shape with areas with FV>300 -continue to circulate to see if possible to save. At 17,000 strokes, saw another thick slug of fluid return to the surface. Cleaned up by 24,000 strokes. Decision made to displace the old mud out to new mud. Reciprocate and circulate while preparing the pits to take on new fluid - 8 bpm, 1,600 psi. Continue to reciprocate and circulate while off loading new fluid into the pits. Displace the well over to new 9.0 ppg LSND drilling fluid. Plug #2: PJSM. RU circulation lines. Pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi - good. Pump remaining 10 bbls of water. Pump 103 bbls of 15.8 ppg Class G cement + adds at 4 bpm. Pump 2 bbls of water behind. Swap over to the rig to displace with 9.0 ppg mud at 8 bpm. Displace with 94 bbls (under displaced by 2 bbls). Open the bleed valve at the surface and verify that the plug was balanced. RD cement lines. The pipe was reciprocated throughout the entire job. CIP - 0800 hours. POH standing back 4" HT-40 DP from 11,527' to 10,465' at 30 ft/min. Drop wiper dart and circulate a bottoms up - 520 gpm, 1,650 psi, PU - 175k, SO - 65k, 50' reciprocation. Plug #3: RU circulation lines. Pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi -good. Pump remaining 10 bbls of water. Pump 103 bbls of 15.8 ppg Class G cement + adds at 4 bpm. Pump 2 bbls of water behind. Swap over to the rig to displace with 9.0 ppg mud at 8 bpm. Displace with 85 bbls (under displaced by 2 bbls). Open the bleed valve at the surface and verify that the plug was balanced. RD cement lines. The pipe was reciprocated throughout the entire job. CIP - 1145 hours. POH standing back 4" HT-40 DP from 10,465' to 9,403' at 30 fUmin. Circulate a bottoms up - 500 gpm, 1,575 psi, PU - 180k, SO - 64k, 50' reciprocation. Plug #4: RU circulation lines. Pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi -good. Pump remaining 10 bbls of water. Pump 103 bbls of 15.8 ppg Class G cement + adds at 4 bpm. Pump 2 bbls of water behind. Swap over to the rig to displace with 9.0 ppg mud at 8 bpm. Displace with 73 bbls (under displaced by 2 bbls). Open the bleed valve at the surface and verify that the plug was balanced. RD cement lines. The pipe was reciprocated throughout the entire job. CIP - 1500 hours. Printed: 10/3/2005 3:03:35 PM BP EXPLORATION Operations Summary Report Page 8 of 13 Legal Well Name: L-215 Common W ell Name: L-215 Spud Date: 9/10/2005 Event Nam e: DRILL+C OMPLE TE Start : 9/7/2005 End: 9/28/2005 Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: 9/28/2005 Rig Name: NABOB S 9ES Rig Number: Date ' From - To Hours Task Code' NPT Phase Description of Operations 9/19/2005 15:00 - 15:45 0.75 PXA P ABAN POH standing back 4" HT-40 DP from 9,403' to 8,341' at 30 ft/min. 15:45 - 16:30 0.75 PXA P ABAN Drop wiper dart and circulate a bottoms up - 510 gpm, 1,540 psi, PU - 158k, SO - 64k, 50' reciprocation. 16:30 - 17:30 1.00 PXA P ABAN Plug #5: RU circulation lines.. Pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi -good. Pump remaining 10 bbls of water. Pump 108 bbls of 15.8 ppg Class G cement + adds at 4 bpm. Pump 2 bbls of water behind. Swap over to the rig to displace with 9.0 ppg mud at 4 bpm. Displace with 72 bbls (under displaced by 2 bbls). Open the bleed valve at the surface and verify that the plug was balanced. RD cement lines. The pipe was reciprocated throughout the entire job. CIP - 1730 hours. 17:30 - 18:30 1.00 PXA P ABAN POH standing back 4" HT-40 DP from 8,341' to 7,000' at 30 ft/min. 18:30 - 19:30 1.00 PXA P ARAN Drop wiper dart and circulate a bottoms up - 550 gpm, 1,525 psi, PU - 146k, SO - 65k, 50' reciprocation. 19:30 - 20:00 0.50 PXA P ARAN Monitor the well -stable. POH standing back 4" HT-40 DP from 7,000' to 5,971'. 20:00 - 00:00 4.00 PXA P ABAN LD 4" HT40 from 5,971' to 2,241'. 9/20/2005 00:00 - 00:30 0.50 PXA P ARAN Stand back 4" HWDP from 2,242' to 1,499'. 00:30 - 05:00 4.50 PXA P ARAN LD 3-1/2" 9.2# L-80 IBT workstring and mule shoe. Lots of mushy cement buildup on the 3 1/2 stinger string required additional time to remove it prior to laying it down. Clear and clean the floor. 05:00 - 06:00 1.00 PXA P ABAN Clean cement and dehydrated mud from under the rotary table. 06:00 - 06:30 0.50 PXA P ABAN Clean out BOP stack, blow down lines. 06:30 - 09:00 2.50 STKOH P PROD2 PJSM. Pick up 8 3/4" drilling BHA #4: Bit, motor, xo, LWD-ARC, MWD, orient, LWD-ADN, NMDC, NMSTB, NMDC, saver sub, jar stand, xo. 09:00 - 09:30 0.50 STKOH P PROD2 RIH 8 stands HWDP, pick up ghost reamer. Shallow hole test MWD. 09:30 - 11:30 2.00 STKOH P PROD2 RIH 11 stands 4" HT drill pipe, pick up ghost reamer and continue RIH to 4183'. 11:30 - 12:30 1.00 STKOH P PROD2 Cut and slip 78' drilling line. 12:30 - 13:00 0.50 STKOH P PROD2 Service top drive. 13:00 - 14:00 1.00 STKOH P PROD2 Circulate bottoms up. 550 gpm, 1470 psi. Returned excessive wall cake in returns, circulate clean. Obtain slow pump rates. 14:00 - 16:30 2.50 STKOH N DPRB PROD2 RIH and set down at 4300'. Attempt to wash down @ 200 gpm, 435 psi, 50 rpm, 5,200 ft/Ibs torque, 117K up weight, 57K down weight. Hole started packing off. Work pipe and establish circulation. Wash back to shoe and circulate hole clean. Returned excessive wall cake in returns. 16:30 - 18:30 2.00 STKOH N DPRB PROD2 Monitor well, pump dry job and POOH from 4226' to 1001'. 18:30 - 19:00 0.50 STKOH N DPRB PROD2 Lay down ghost reamer and stand back 8 stands HWDP. 19:00 - 21:00 2.00 STKOH N DPRB PROD2 PJSM for nuclear source. Stand back BHA #4. 21:00 - 22:30 1.50 STKOH N DPRB PROD2 Make up hole opener BHA #5. 8 1/2" hole opener, bit sub w/ float, 2 HWDP, 8-3/4" NMSTB, jar stand, xo, 24 HWDP. 22:30 - 00:00 1.50 STKOH N DPRB PROD2 RIH from 938' to 4226' with 4" drill pipe. 9/21/2005 00:00 - 04:00 4.00 STKOH N DPRB PROD2 Wash and ream with hole opening assembly from 4226' to 4673' without problems. Wash and ream every other stand from 4673' to top of cement C~ 7000 without problems. 400 gpm, 800 psi, 70 rpm, 4,500 ft/Ibs torque, 150K up weight, 70K Printed: 10/3/2005 3:03:35 PM • BP EXPLORATION Page 9 of 13 Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: Date 'From - To ' Hours Task :Code NPT ' Phase Description of Operations - -~ -_ 9/21 /2005 ~ 00:00 - 04:00 4.00 ~ STKOH N ~ DPRB ~ PROD2 down weight. 04:00 - 05:00 I 1.001 STKOH I N I DPRB I PROD2 05:00 - 08:30 3.50 STKOH N DPRB PROD2 08:30 - 09:00 0.50 STKOH N DPRB PROD2 09:00 - 09:30 0.50 STKOH N DPRB PROD2 09:30 - 12:00 2.50 STKOH N DPRB PROD2 12:00 - 13:30 1.50 STKOH N DPRB PROD2 13:30 - 14:30 1.00 STKOH P ~ PROD2 14:30 - 15:30 I 1.00 I STKOH I P 15:30 - 16:00 I 0.501 STKOH I P 16:00 - 00:00 I 8.001 DRILL I P 9/22/2005 ~ 00:00 - 11:00 11.00 ~ DRILL ~ P 11:00 - 12:00 I 1.001 DRILL I P 12:00 - 13:00 I 1.001 DRILL I P 13:00 - 14:30 1 1.501 DRILL I P 14:30 - 19:30 I 5.001 DRILL I P 19:30 - 21:00 1.50 DRILL P 21:00 - 22:00 1.00 DRILL P 22:00 - 00:00 2.00 DRILL P 9/23/2005 00:00 - 02:30 2.50 DRILL P PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 Set 20K down on cement C~3 7000'. Plug verification witness waived by AOGCC rep Jeff Jones. Circulate and condition mud 1.5 bottoms up C~3 560 gpm, 1975 psi, 80 rpm, 7,000 ft/Ibs torque, 96K up weight, 92K down weight. Monitor well, POOH from 7000'. 150K up weight, 70K down weight. Lay down hole opener assembly. Clear floor. PJSM for BHA and nuclear source. Make up bit and run drilling assembly BHA #6 out of derrick. Turn on LW D, MWD tools, load source, install STAB in collar stand and RIH to 1001'. Shallow hole test MWD. RIH with BHA #6 on 4" HT-40 drill pipe from 1001' to shoe C 4226'. CBU Q shoe while displacing well with new 8.9 ppg LSND mud. 575 gpm, 1365 psi. Obtain benchmark ECD: 9.63 ppg RIH from 4226' to 6565'. 114K up weight, 65K down weight, 81 K rotating weight. Obtain benchmark ECD :9.75 ppg. Perform open hole sidetrack @ 6585' by trenching, then rotating ahead starting C~3 6585'. Drill ahead directionally keeping ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 6,585' to 7,668' reaming each stand - PU - 163k, SO - 103k, ROT - 75k, 580 gpm, 100 rpm, 2,380 psi on bottom, 2,340 off bottom, TO on - 10.2k, TO off - 9.7k. AST - 1.13, ART - 2.40, Calc ECD - 9.92, Actual ECD - 10.07. Drill ahead directionally keeping ECD's < 0.6 ppg over calculated. Drill 8-3/4" from 7,668' to 8,759' reaming each stand - PU - 165k, SO - 85k, ROT - 114k, 580 gpm, 100 rpm, 3,080 psi on bottom, 2,870 off bottom, TO on - 11 k, TO off - 7k. Calc ECD - 9.77, Actual ECD - 10.12, AST - 3.0 hr, ART - 3.1 hr Circulate due to shaker screens blinding off from cement returns. 400 gpm, 1600 psi, 100 rpm, TO - 8k, PU - 114k, SO - 100k. Drill ahead directionally. Drill 8-3/4" from 8,759' to TD @ 9,020' MD, 4874' TVD, reaming each stand - PU - 161 k, SO - 82k, ROT - 112k, 580 gpm, 100 rpm, 3,060 psi on bottom, 2,990 off bottom, TO on - 11 k, TO off - 10k. Calc ECD - 9.75, Actual ECD - 10.44, AST - 0.0 hr, ART - 1.03 hr Pump 30 bbl HI-VIS sweep. Circulate bottoms up X 2 ~ 580 gpm, 2,940 psi, 100 rpm, 8.7k TO. Final actual ECD = 9.93 Monitor well. POH and backream from 9020' to 6262' with ghost reamer @ shoe. 500 gpm, 2,255 psi, 100 rpm, 9.2k - 10.5k TO. PU - 175k, SO - 90k w/o pump. POH from 6,262' to 4226' with no problems. PU - 140k, SO - 70k. Circulate bottoms up C~? shoe. 580 gpm, 1880 psi. Monitor well, pump dry job and POH from 4226' to 1001' PJSM on BHA & nuclear source. Flush tools with water and lay Printed: 10/3/2005 3:03:35 PM BP EXPLORATION Page 10 of 13 Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT ' Phase ~ Description of Operations 9/23/2005 00:00 - 02:30 2.50 DRILL P PROD2 down BHA #6 02:30 - 03:00 0.50 DRILL P PROD2 Clear floor, lay down vendor tools. 03:00 - 04:00 1.00 CASE P PROD2 Pull wear bushing, flush BOP stack, install BOP test plug 04:00 - 05:30 1.50 CASE P PROD2 Change top pipe rams from 3.5" x 6" VBR to 7" 05:30 - 06:00 0.50 CASE P PROD2 Rig up and test ram door seals to 3500 psi. Pull test plug. 06:00 - 08:00 2.00 CASE P PROD2 Make dummy run with 7" hanger. Rig up to run 7" casing. 08:00 - 12:00 4.00 CASE P PROD2 Make up 7" shoe track and RIH with 7" 26# L-80 BTC-Mod production casing to 1,512'. Baker Lok 1st 3 connections on shoe track, check floats - OK. Used Best O Life pipe dope, torqued to 7000 fUlbs. Fill pipe every joint with Frank's tool. 80 fpm running speed. 12:00 - 13:00 1.00 CASE P PROD2 De-ice derrick. 13:00 - 15:00 2.00 CASE P PROD2 Continue RIH with 7" casing from 1,512' to 4,207'. Circulated for 10 minutes @ 2,183'. 15:00 - 16:00 1.00 CASE P PROD2 Circulate 1.5 X annulus volume C~3 4,207'. PU - 118k, SO - 76k, stage pumps up to 6 bpm, 325 psi. 40 SPM = 230 psi. 16:00 - 00:00 8.00 CASE P PROD2 Run 7" casing in open hole from shoe C~3 4,226' to 8,251' @ 2 min per joint, filling every joint, breaking circulation every 15 joints for 10 min each. Record PU & SO weights every 15 joints. Start circulating every joint down per program from 8,251' to 8,465' by staging pump up to 5 bpm @ 2 min per joint. PU - 245k, SO - 88k. 9/24/2005 00:00 - 01:30 1.50 CASE P PROD2 Run 7" casing from 8,465' to 8,998' circulating every joint down per program by staging pump up to 5 bpm @ 2 min per joint. Land casing @8,998'. PU - 260k, SO - 80k. No problems through out job. Ran 212 joints - 8,928', 2 - 20' pup joints Shoe @ 8,998' FC ~ 8,911' RA Tags @ 8,176' & 7,946' (56) 7" x 8 3/8" rigid staight blade centralizers 2 locked next to shoe 2 floating, separated by stop ring in mid joint on all even numbered joints (4-18) 1 floating on all odd numbered joints (5-17) 1 floating on joints (19-49) 01:30 - 02:00 0.50 CEMT P PROD2 Rig down Frank's tool, blow down top drive, rig up cement head and hoses. 02:00 - 03:30 1.50 CEMT P PROD2 Circulate 7" casing C«~ 6 bpm 490 psi, PU - 260k, SO - 80k. Staged pumps up, 10 minutes each ~ 3 bpm, 4 bpm, 5 bpm. Recipricated 12' strokes through out circulation. Held cement PJSM while circulating. SLB started chemical mix @ 02:30 hr. 03:30 - 05:30 2.00 CEMT P PROD2 Cement 7" casing. Pump 5 bbls water, test lines to 3500 psi - OK. Pump 15 bbls CW 100 @ 4.5 bpm, FCP - 400 psi. Pump 35 bbls 10 ppg MUD PUSH Q 3.5 bpm, FCP - 300 psi. Shut down and release bottom plug, mix on fly and pump 52 bbls class "G" 13.0 ppg lead cement @ 5 bpm, FCP - 290 psi. Switch to batched mixed slurry and pump 82 bbls class "G" GASBLOK 15.8 ppg tail cement C~ 5.8 bpm, FCP - 250 psi. Shut down, wash cement lines to floor. Release top plug and displace cement with 341 bbls of heated seawater. 1st 300 Printed: 10/3/2005 3:03:35 PM • BP EXPLORATION Page 11 of 13 Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: Date '; From - To Hours Task Code I NPT I Phase Description of Operations 9/24/2005 103:30 - 05:30 2.00 - ~ I - - _ ~ ~ - CEMT P~ ~ PROD2 bbls C~3 6.5 bpm, FCP - 960 psi. Next 30 bbls @ 4 bpm, FCP - 05:30 - 06:00 0.50 CEMT P 06:00 - 07:00 1.00 CEMT P 07:00 - 08:00 1.00 CEMT P 08:00 - 09:30 1.50 BOPSU P 09:30 - 11:00 1.50 CONDH P 11:00 - 14:30 I 3.501 BOPSUR P 14:30-15:00 0.50 BOPSU~P 15:00 - 15:30 0.50 EVAL P 15:30 - 17:00 1.50 CONDH P 17:00 - 18:30 1.50 CONDH P 18:30 - 20:30 2.00 PERFO P 20:30 - 00:00 I 3.501 PERFOBI P 9/25/2005 100:00 - 01:30 I 1.501 PERFOBI P 01:30 - 08:00 6.50 PERFO P 08:00 - 09:00 1.00 PERFO P 09:00 - 10:00 1.00 PERFO P 1,130 psi. Last 11 bbls @ 2 bpm, FCP - 1,050. Stopped reciprocation w/ 50% of tail around shoe. Bumped plug w/ calculated strokes with 2,100 psi. CIP Q 05:30 hrs. Bleed off pressure, check floats - OK. PROD2 RD cementing equipment. PROD2 Install FMC 7" X 9 5/8" packoff, test same to 5,000 psi - 10 min. - OK. PROD2 Clear rig floor of casing and cementing equipment. Flush BOP stack. OTHCMP Install BOPE test joint and test plug. Change top pipe rams from 7" to 3.5" X 6" VBR's. OTHCMP Rig up and establish injection rate for 9 5/8" by 7" annulus. Inject 30 bbls of 9.0 ppg, 47 viscosity mud @ 2 bpm. ICP - 675' psi, FCP - 725 psi, SIP - 550 psi. OTHCMP Test BOPE and related surface equipment to 250 psi low test, 4,000 psi high test. Held each test for 5 minutes. AOGCC waived witness of test by Chuck Sheave. Test witnessed by Nabors TP -Bill Bixby and BP rep. -Tom Anglen OTHCMP Rig down test equpment, install wear bushing, blow down lines. OTHCMP Test 7" casing to 4,000 psi - 30 min. No pressure loss. OTHCMP Inject 110 bbls of 9.0 ppg, 47 viscosity mud down 9 5/8" X 7" outer annulus @ 3 bpm. ICP - 790 psi, FCP - 790 psi, SIP - 600 psi. OTHCMP Freeze protect 9 5/8" X 7" outer annulus with 120 bbls 90 deg. dead crude @ 2 bpm. ICP - 690 psi, FCP - 900 psi, SIP - 800 psi. OTHCMP PJSM with Schlumberger, pick up 18 4.5" 5 SPF perforating guns, firing head, 3 joint 3.5" HWDP, load slimpulse tool in MWD collar. OTHCMP RIH with DPC perforating guns on drill pipe to 1,737'. Shallow hole test MWD, 280 gpm, 400 psi. Continue run pert assembly to 4914' OTHCMP Continue RIH with 4.5" HSD, 5 SPF, DPC perforating guns on drill pipe from 4,914' to FC C~3 8912'. OTHCMP Correlate depths by logging from 8,912' to 8,708'. PU - 188k, SO - 75k. Set pipe on perforating depths for top shot @ 7,970', bottom shot @ 8,710'. OTHCMP Displace well from seawater to 9.2 ppg brine @ 5 bpm, 525 psi. OTHCMP PJSM w/SLB. Cycle pump and fire guns. Had positive indication Ca? surface Monitor well. Initial loss = 15 bbls to perfs. Perforated 5 SPF C«~ (7,970' - 8,005'), (8,210' - 8,270'), (8,330' - 8,395'), (8,420' - 8,440'), (8,625' - 8,710') Total of 265' and 1,325 perforations. 10:00 - 10:30 0.50 PERFO P OTHCMP POH from 8,710' to 7,900'. PU - 170k, SO - 75k. 10:30 - 12:00 1.50 PERFO P OTHCMP Circulate bottoms up X 1.5 @ 5.4 bpm, 600 psi. Monitor well, pump dry job. Lost 22 bbls to perfs. Static loss - 1 bph. 12:00 - 18:00 6.00 PERFO P OTHCMP POH laying down drill pipe and HWDP from 7,901' to 968'. Monitor well. 18:00 - 23:00 5.00 PERFO P , OTHCMP PJSM w/ SLB. Lay down remainder of BHA, lay down Printed: 10/3/2005 3:03:35 PM BP EXPLORATION Page 12 of 13 Operations Summary Report Legal Well Name: L-215 Common Well Name: L-215 Spud Date: 9/10/2005 Event Name: DRILL+COMPLETE Start: 9/7/2005 End: 9/28/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/28/2005 Rig Name: NABOBS 9ES Rig Number: -' From - To ~ Hours Task Code Date I _ - i -- - - 9/25/2005 118:00 - 23:00 I 5.001 PERFOBI P 23:00 - 00:00 I 1.001 PERFOBI P 9/26/2005 9/27/2005 00:00 - 01:00 1.00 EVAL P 01:00 - 02:00 1.00 EVAL P 02:00 - 02:30 0.50 EVAL P 02:30 - 04:00 1.50 EVAL P 04:00 - 05:30 1.50 EVAL P 05:30 - 17:00 I 11.501 EVAL I P 17:00 - 22:30 I 5.501 EVAL I P 22:30 - 00:00 1.50 BOPSU P 00:00 - 00:30 0.50 BOPSU P 00:30 - 01:30 1.00 BUNCO 01:30 - 14:00 12.50 BUNCO NPT Phase Description of Operations OTHCMP perforating guns. 'All shots fired. OTHCMP Clean and clear floor of vendor equipment. Lost 40 bbls to perfs in 12 hrs. Static loss - 3.3 bph. 77 bbls total to perfs. OTHCMP RIH with remaining 4" HT-40 drill pipe out of derrick to 2,060' OTHCMP Cut & slip drilling line OTHCMP Service top drive, blocks, and crown sheaves. OTHCMP POH laying down 66 joints 4" HT-40 drill pipe. OTHCMP Rig up to keep hole full under blind rams. Change top rams from 3.5" x 6" VBR to 7". Test door seals 3,500 psi. Pull test plug, install wear bushing. OTHCMP Rig up SLB WL BOP and lubricator extension under 7" pipe rams for JB/GR runs. Run #1 5.97" GR to 8847', retrieved appx. 1 Ot gun debris. Run #2 -same. Run #3 5.8" GR to 8847', no debris. Run #4 w/o GR (JB 5.4375" OD to 8847', retrieved 1 Ot. Run #5 w/o GR to 8850' ,retrieved 1 Ot. Run #5 w/o GR to 8852', no debris. Lay down JB. OTHCMP Pick up USIT. RIH to 8834', log up to 4800'. Rig down SLB WL Cement stringers to 4922' Top of good cement ~ 5400' Logs confirmed perforations on depth RUNCMP Rig down 7" lubricator, pull wear bushing, change top rams from 7" to 3.5" x 6" VBR. Lost 75 bbls to perforations, 152 bbls total to perfs for well. RUNCMP Install test plug, test top rams to 4000 psi. Pull test plug. RUNCMP Make tubing hanger dummy run and rig up to run completion. RUNCMP RIH with 3.5" 9.2# L-80 TCII straddle completion to 8,512' -all connections 'torque turned' and charted on computer. Land tubing on hanger - PU - 90K, SO - 60K. RILDS. Ran 256 joints of 3.5" 9.2# L-80 TCII utilizing Jet Lube Seal Guard thread lubricant and torquing connections (computer assisted) with 2300 ftlbs make-up torque. Connections below the packer assy set at 8,480' have been Bakerlok'd. The lifting threads on the tubing hanger are 4.5" TCII WLEG - 8,512' X Profile (2.813" ID) w/RHC-M Plug - 8,498' Premier Packer - 8480' X Profile (2.813" ID) - 8,459' WFM#1 w/ 1.5" Dummy Valve and RK latch - 8,430' WFM#2 w/ 1.5" Dummy Valve and RK latch- 8,339' Premier Packer - 8,281' X Profile (2.813" ID) - 8,260' RA tag on centralizer - 8,241' WFM#3 w/ 1.5" Dummy Valve and RK latch- 8,232' WFM#4 w/ 1.5" Dummy Valve and RK latch- 8,171' Premier Packer - 8,114' Printed: 10/3/2005 3:03:35 PM • BP EXPLORATION Page 13 of 13 Operations Summary Report Legal Well Name: L-215 Common W ell Name: L-215 Spud Date: 9/10/2005 Event Nam e: DRILL+C OMPLE TE Start : 9/7/2005 End: 9/28/2005 Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: 9/28/2005 Rig Name: NABOB S 9ES Rig Number: ~ ~ Date '~~ From - To I Hours Task Code NPT Phase Description of Operations 9/27/2005 01:30 - 14:00 12.50 - - BUNCO - - ~ RUNCMP -- --- - - - --- X Profile (2.813" ID) - 8,093' WFM#5 w/ 1.5" Dummy Valve and RK latch- 8,064' WFM#6 w/ 1.5" Dummy Valve and RK latch- 7,941' Premier Packer - 7,884' X Profile (2.813" ID) - 7,863' GLM#7 w/ 1.5" MMG w/DCR-1 and RK latch- 7,740' X Profile (2.813" ID) - 3,779' 14:00 - 14:30 0.50 BUNCO RUNCMP Land tubing on hanger - PU - 90K, SO - 60K. RILDS. Drop 1.3125" roller ball rod. Lay down landing joint, close blind rams. 14:30 - 16:00 1.50 BUNCO RUNCMP Set packers and pressure test tubing with 4200 psi - 30 min - 0 loss. Bleed tubing pressure down to 1600 psi. Pressure test tubing annulus with 4000 psi - 30 min. - 0 loss. Bleed annulus pressure then tubing pressure. Pressure up annulus and shear out DCR valve @ 2300 psi. Pumped both ways to confirm shear-out. 16:00 - 16:30 0.50 BUNCO RUNCMP Install 2-way check valve, test valve to 1000 psi from below hanger. Blow down lines. 16:30 - 17:30 1.00 BUNCO RUNCMP Rig down Nabors Casing Service, clear floor. 17:30 - 19:30 2.00 BOPSU P RUNCMP PJSM. Blow down lines, nipple down BOPS, secure BOP stack in cellar. 19:30 - 22:00 2.50 WHSUR P RUNCMP Nipple up 11" x 5M x 4" SBMS adapter flange and 4 1/16" 5M production tree. Test tubing hanger to 5000 psi - 10 min - OK. Test adapter flange and tree to 5000 psi - OK. 22:00 - 23:00 1.00 WHSUR P RUNCMP Pull 2-way-check with DSM lubricator. 23:00 - 00:00 1.00 BUNCO RUNCMP Reverse circulate inhibited 9.2 ppg brine down tubing annulus @ 3 bpm, 375 psi. 9/28/2005 00:00 - 00:30 0.50 BUNCO RUNCMP Continue reverse circulate 103 bbls of inhibited 9.2 ppg brine down tubing annulus @ 3 bpm, 375 psi. 00:30 - 02:00 1.50 BUNCO RUNCMP Freeze protect well by LRHOS reverse circulating 113 bbls diesel down tubing annulus C~ 2 bpm, ICP - 200 psi, FCP - 500 psi. Shut down and U-tube diesel back to tubing. SIP 150 psi. 02:00 - 03:30 1.50 BUNCO RUNCMP Rig down LRHOS. U-tube diesel back to tubing. SIP 150 psi. 03:30 - 04:30 1.00 BUNCO RUNCMP Install BPV & test to 1000 psi from below. Rig down DSM. Remove double annulus valves and install VR plugs in the IA and OA. Secure surface stack for rig move. 04:30 - 06:00 1.50 DHB P POST Finish emptying brine tanks. Prepare for rig move. Release rig for L-50 ~ 06:00 hr 9/28/2005 Printed: 10!3!2005 3:03:35 PM L-215 Su Report Date: 22-Sep-05 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: L-PAD / L-215 Well: L-215 Borehole: L-215 UWIIAPI#: 500292327400 Survey Name /Date: L-215-1 /September 22, 2005 Tort /AHD / DDI i ERD ratio: 168.944° / 7026.24 ft) 6.34211.442 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaVLong: N 70 21 2.620, W 149 19 24.936 Location Grid N/E Y/X: N 5978317.210 ftUS, E 583310.850 ftUS Grid Convergence Angle: +0.63702199° R sort Survey /DLS Computation Method: Minimum Curvature / Lt Vertical Section Azimuth: 45.000° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table TVD Reference Elevation: 78.30 ft relative to MSL Sea Bed /Ground Level Elevation: 49.80 ft relative to MSL Magnetic Declination: 24.491° Total Field Strength: 57575.814 nT Magnetic Dip: 80.846° Declination Date: September 07, 2005 Magnetic Declination Model: BGGM 2005 North Reference: True North Total Corr Mag North -> True North: +24.491 ° • Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS H I t 0.00 0.UU U.UO -/8.30 0.00 0.00 O.UO U.OU 0.00 0.00 O.OU 597831 L21 583310.85 N 7U 21 2.620 W 149 19 24.936 First GYD GC SS 100.00 0.37 263.62 21. 70 100.00 -0.25 0.32 0.32 -0.04 -0.32 0.37 5978317.17 583310.53 N 70 21 2.619 W 149 19 24.945 200.00 0.50 284.65 121. 70 200.00 -0.73 1.07 1.06 0.04 -1.06 0.20 5978317.24 583309.79 N 70 21 2.620 W 149 19 24.967 300.00 0.88 306.29 221. 69 299.99 -1.06 2.26 2.19 0.60 -2.11 0.45 5978317.79 583308.74 N 70 21 2.626 W 149 19 24.997 400.00 2.39 346.42 321. 65 399.95 -0.09 5.02 4.45 3.08 -3.21 1.81 5978320.26 583307.60 N 70 21 2.650 W 149 19 25.030 500.00 4.43 358.95 421. 47 499.77 3.68 10.95 9.74 8.97 -3.77 2.16 5978326.14 583306.98 N 70 21 2.708 W 149 19 25.046 600.00 6.67 8.60 520. 99 599.29 11.03 20.60 18.82 18.58 -2.98 2.42 5978335.75 583307.67 N 70 21 2.802 W 149 19 25.023 700.00 9.03 29.78 620. 07 698.37 23.28 34.11 31.19 31.14 1.79 3.70 5978348.36 583312.30 N 70 21 2.926 W 149 19 24.883 800.00 12.57 36.17 718. 29 796.59 41.62 52.82 48.28 46.74 12.11 3.73 5978364.08 583322.44 N 70 21 3.079 W 149 19 24.582 900.00 16.01 45.32 815. 19 893.49 66.17 77.45 71.12 65.23 28.35 4.11 5978382.74 583338.47 N 70 21 3.261 W 14919 24.107 Last GYD GC SS 1000.00 21.77 48.93 909. 77 988.07 98.49 109.81 101.54 87.13 52.16 5.87 5978404.90 583362.03 N 70 21 3.477 W 149 19 23.412 First MWD+IFR+MS 1040.13 24.00 48.98 946. 74 1025.04 114.05 125.41 116.48 97.37 63.93 5.56 5978415.28 583373.68 N 70 21 3.577 W 149 19 1132.84 27.54 47.31 1030. 21 1108.51 154.29 165.71 155.78 124.29 93.91 3.90 5978442.52 583403.37 N 70 21 3.842 W 149 19 1226.75 31.23 46.69 1112. 03 1190.33 200.34 211.78 201.32 155.72 127.60 3.94 5978474.32 583436.70 N 70 21 4.151 W 149 19 21. 7 1320.65 34.86 45.84 1190. 73 1269.03 251.52 262.97 252.22 191.12 164.58 3.90 5978510.13. 583473.28 N 70 21 4.499 W 149 19 20.126 1413.97 39.42 45.01 1265. 10 1343.40 307.84 319.30 308.39 230.67 204.68 4.92 5978550.12 583512.94 N 70 21 4.885 W 149 19 18.954 1508.15 43.89 44.17 1335. 45 1413.75 370.42 381.88 370.90 275.25 248.60 4.78 5978595.18 583556.35 N 70 21 5.327 W 149 19 17.670 1604.10 49.95 45.64 1400. 96 1479.26 440.47 451.93 440.87 324.83 298.08 6.41 5978645.30 583605.27 N 70 21 5.814 W 14919 16.224 1695.33 51.49 45.75 i 458. 71 1537.01 511.08 522.54 511.40 374.15 348.62 1.69 5978695.18 583655.25 N 70 21 6.299 W 149 19 14.747 1790.21 50.38 45.76 1518. 51 1596.81 584.74 596.21 584.99 425.55 401.39 1.17 5978747.16 583707.45 N 70 21 6.805 W 149 19 13.204 1882.97 52.44 45.81 1576. 36 1654.66 657.23 668.71 657.43 476.11 453.35 2.22 5978798.29 583758.84 N 70 21 7.302 W 149 19 11.686 1976.30 54.72 46.52 1631. 77 1710.07 732.31 743.81 732.45 528.12 507.53 2.52 5978850.89 583812.43 N 70 21 7.813 W 149 19 10.102 Tie-In Survey 2070.46 56.57 47.11 1684. 90 1763.20 810.00 821.54 810.09 581.31 564.21 2.03 5978904.70 583868.51 N 70 21 8.337 W 14919 8.446 MWD+IFR+MS 2163.54 59.17 46.84 1734. 40 1812.70 888.77 900.36 888.82 635.09 621.82 2.80 5978959.11 583925.52 N 70 21 8.865 W 149 19 6.761 2256.85 62.56 46.49 1779. 82 1858.12 970.23 981.85 970.26 691.02 681.10 3.65 5979015.69 583984.16 N 70 21 9.415 W 149 19 5.029 'F M ~. m 4L ~~ SurveyEditor Ver SP 1.0 Bld{ doc40x_56) L-215\L-215\L-215\L-215-i Generated 10/25/2005 2:24 PM Page 1 of 3 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea ND ND Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS L34y.lb b4.yb 45.U1 I23LV.b3 I25yi3.y3 IVb3.VV IVb4.b3 IU53.VL /42f./y /4V.323 L.y/ by/yV/4.11 b234V4L./y IV /V G7 y.yt54 VV 14y ly 3.Gyb 2444.03 66.18 44.45 1859.87 1938.17 1139.38 1151.01 1139.40 810.16 801.17 1.39 5979136.15 584102.89 N 70 21 10.587 W 149 191.519 2537.77 64.79 44.91 1898.77 1977.07 1224.67 1236.30 1224.69 870.80 861.14 1.55 5979197.45 584162.18 N 70 21 11.183 W 14918 59.766 2630.87 65.82 45.11 1937.66 2015.96 1309.25 1320.88 1309.27 930.60 920.96 1.12 5979257.90 584221.32 N 70 21 11.771 W 149 18 58.017 2724.95 65.06 44.31 1976.77 2055.07 1394.82 1406.45 1394.84 991.41 981.16 1.12 5979319.37 584280.84 N 70 21 12.369 W 149 18 56.257 2818.40 63.66 44.35 2017.20 2095.50 1479.06 1490.70 1479.08 1051.67 1040.03 1.50 5979380.28 584339.03 N 70 21 12.962 W 149 18 54.536 2911.33 63.36 46.98 2058.66 2136.96 1562.22 1573.87 1562.23 1109.79 1099.51 2.55 5979439.05 584397.86 N 70 21 13.534 W 14918 52.798 3004.77 65.10 44.38 2099.29 2177.59 1646.35 1658.01 1646.36 1168.59 1159.70 3.12 5979498.51 584457.38 N 70 2f 14.112 W 149 18 51.038 3098.19 64.30 44:40 2139.21 2217.51 1730.80 1742.47 1730.81 1228.94 1218.78 0.86 5979559.51 584515.78 N 70 21 14.705 W 149 18 49.311 3190.86 65.43 41.11 2178.58 2256.88 1814.61 1826.36 1814.64 1290.54 1275.71 3.44 5979621.73 584572.02 N 70 21 15.311 W 149 18 47.646 3284.89 63.58 41.59 2219.05 2297.35 1899.31 1911.23 1899.38 1354.25 1331.78 2.02 5979686.05 584627.37 N 70 21 15.937 W 149 18 3378.06 64.43 41.15 2259.89 2338.19 1982.89 1994.97 1983.00 1417.09 1387.13 1.01 5979749.50 584682.01 N 70 21 16.555 W 149 18 3471.06 65.46 41.63 2299.27 2377.57 2066.97 2079.22 2067.14 1480.30 1442.83 1.20 5979813.32 584737.00 N 70 21 17.177 W 149 18 3565.75 64.40 42.18 2339.40 2417.70 2152.61 2164.99 2152.83 1544.13 1500.11 1.24 5979877.78 584793.56 N 70 21 17.805 W 149 18 41.086 3659.61 65.94 41.34 2378.81 2457.11 2237.65 2250.17 2237.94 1607.67 1556.84 1.83 5979941.94 584849.58 N 70 21 18.429 W 149 18 39.427 3753.02 65.06 41.90 2417.55 2495.85 2322.50 2335.16 2322.86 1671.22 1613.30 1.09 5980006.10 584905.32 N 70 21 19.054 W 149 18 37.776 3846.23 64,40 40.71 2457.34 2535.64 2406.61 2419.45 2407.06 1734.53 1668.93 1.35 5980070.03 584960.24 N 70 21 19.677 W 149 18 36.150 3940.58 65.77 42.43 2497.08 2575.38 2492.02 2505.02 2492.56 1798.54 1725.71 2.20 5980134.66 585016.30 N 70 21 20.306 W 149 1 S 34.489 4033.73 64.65 41.84 2536.14 2614.44 2576.48 2589.59 2577.09 1861.25 1782.45 1.33 5980197.99 585072.33 N 70 21 20.923 W 149 18 32.831 4126.62 64.08 41.45 2576.33 2654.63 2660.09 2673.33 2660.78 1923.83 1838.10 0.72 5980261.18 585127.27 N 70 21 21.538 W 149 18 31.203 4177.75 64.30 41.47 2598.59 2676.89 2706.03 2719.36 2706.77 1958.33 1868.57 0.43 5980296.00 585157.36 N 70 21 21.877 W 149 18 30.312 4251.06 62.97 40.46 2631.15 2709.45 2771.55 2785.04 2772.38 2007.92 1911.64 2.19 5980346.07 585199.87 N 70 21 22.365 W 149 18 29.053 4295.17 62.83 40.63 2651.24 2729.54 2810.70 2824.31 2811.60 2037.76 1937.16 0.47 5980376.19 585225.06 N 70 21 22.658 W 149 18 28.307 4389.18 63.94 43.02 2693.36 2771.66 2894.61 2908.36 2895.60 2100.38 1993.21 2.56 5980439.42 585280.40 N 70 21 23.274 W 149 18 26.668 4482.39 63.94 43.56 2734.31 2812.61 2978.30 2992.09 2979.33 2161.33 2050.63 0.52 5980501.00 585337.13 N 70 21 23.873 W 149 18 24.989 4575.55 64.94 45.04 2774.50 2852.80 3062.33 3076.13 3063.36 2221.47 2109.32 1.79 5980561.78 585395.15 N 70 21 24.465 W 149 18 23.272 4668.57 64.52 44.80 2814.21 2892.51 3146.45 3160.25 3147.45 2281.03 2168.72 0.51 5980622.00 585453.87 N 70 21 25.050 W 149 18 21.535 4761.94 63.27 44.76 2855.30 2933.60 3230.29 3244.09 3231.28 2340.55 2227.78 1.34 5980682.16 585512.26 N 70 21 25.635 W 149 18 19.808 4854.01 65:50 45.61 2895.10 2973.40 3313.31 3327.11 3314.26 2399.05 2286.67 2.56 5980741.31 585570.50 N 70 21 26.211 W 149 i8 18.086 4950.17 63.10 45.73 2936.80 3015.10 3399.94 3413.75 3400.85 2459.60 2348.65 2.50 5980802.53 585631.79 N 70 21 26.806 W 149 18 1 5047.85 60.90 47.87 2982.66 3060.96 3486.14 3499.99 3486.96 2518.64 2411.50 2.97 5980862.27 585693.97 N 70 21 27.386 W 149 18 14. 6 5141.64 63.15 50.31 3026.65 3104.95 3568.74 3582.81 3569.42 2572.86 2474.10 3.32 5980917.18 585755.96 N 70 21 27.919 W 149 18 12.605 5235.86 63.78 50.15 3068.75 3147.05 3652.68 3667.10 3653.21 2626.79 2538.89 0.69 5980971.81 585820.14 N 70 21 28.450 W 149 18 10.710 5329.38 65.07 49.29 3109.12 3187.42 3736.75 3751,46 3737.16 2681.33 2603.24 1.61 5981027.06 585883.88 N 70 21 28.986 W 14918 8.828 5423.24 64.17 47.49 3149.35 3227.65 3821.40 3836.26 3821.73 2737.63 2666.64 1.98 5981084.06 585946.64 N 70 21 29.539 W 149 18 6.974 5516.69 66.24 43.93 3188.55 3266.85 3906.21 3921.08 3906.51 2796.87 2727.34 4.11 5981143.96 586006.67 N 70 21 30.122 W 149 18 5.199 5610.09 65.94 43.59 3226.40 3304.70 3991.57 4006.47 3991.90 2858.54 2786.39 0.46 5981206.28 586065.03 N 70 21 30.728 W 14918 3.472 5703.43 65.70 45.53 3264.64 3342.94 4076.71 4091,62 4077.04 2919.21 2846.14 1.91 5981267.60 586124.09 N 70 21 31.324 W 149 18 1.725 5796.40 66.02 44.54 3302.66 3380.96 4161.55 4176.46 4161.87 2979.16 2906.16 1.03 5981328.21 586183.44 N 70 21 31.914 W 14917 59.969 5890.38 64.13 44.76 3342.27 3420.57 4246.77 4261.68 4247.09 3039.79 2966.05 2.02 5981389.50 586242.65 N 70 21 32.510 W 149 17 58.217 5983.47 65.57 42.46 3381.83 3460.13 4331.00 4345.94 4331.34 3100.80 3024.16 2.72 5981451.15 586300.07 N 70 21 33.110 W 14917 56.518 6076.21 64.73 43.30 3420.81 3499.11 4415.10 4430.09 4415.47 3162.47 3081.42 1.22 5981513.44 586356.63 N 70 21 33.716 W 149 17 54.843 6169.70 64.73 43.94 3460.72 3539.02 4499.61 4514.64 4500.01 3223.67 3139.74 0.62 5981575.28 586414.27 N 70 21 34.318 W 149 17 53.137 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-215\L-215\L-215\L-215-1 Generated 10/25/2005 2:24 PM Page 2 of 3 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea ND ND Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 6262.82 65.26 45.69 3500.08 3578.38 4584.00 4599.03 4584.39 3283.53 3199.22 1.80 5981635.80 6356.02 65.11 46.30 3539.20 3617.50 4668.58 4683.62 4668.94 3342.30 3260.07 0.62 5981695.23 Tie-In Survey 6448.10 65.62 47.14 3577.58 MWD+IFR+MS 6546 .45 65.91 47.42 3617.95 6640 .21 67.58 48.69 3654.97 6734 .24 66.70 48.09 3691.50 6827 .26 67.23 49.27 3727.90 6919 .71 66.66 46.49 3764.11 7013 .34 65.86 44.97 3801.80 7107 .22 64.59 44.00 3841.14 7201 .50 63.45 43.31 3882.44 7293 .77 63.43 43.24 3923.70 7386 .98 63.38 43.06 3965.43 7480 .69 63.43 43.32 4007.38 7574 .75 63.61 43.91 4049.32 7668 .08 63.33 43.08 4091.01 7761 .44 63.43 43.20 4132.84 5184.83 5270.52 5355.76 5440.49 5523.00 5606.32 5690.09 5774.27 5857.76 5941.20 3689.19 3749.01 3809.82 3871.13 3931.22 3992.03 4053.13 4114.08 4174.65 4235.56 7855 .00 61 .56 43 .59 4176.05 4254.35 6023.95 6039.96 6024.17 4295.85 7947 .70 59 .65 41 .45 4221.55 4299.85 6104.63 6120.72 6104 .87 4355.36 8041 .45 58 .47 38 .65 4269.76 4348.06 6184.72 6201.12 6185 .03 4416.90 8134 .52 58 .29 37 .50 4318.55 4396.85 6263.40 6280.37 6263 .80 4479.28 8227 .82 56 .74 37 .39 4368.66 4446.96 6341.41 6359.07 6341 .94 4541.77 8322 .23 57 .31 37 .64 4420.04 4498.34 6419.94 6438.27 6420 .60 4604.59 8415 .99 57 .28 37 .50 4470.70 4549.00 6498.17 6517.17 6498 .98 4667.12 8508 .50 55 .94 36 .55 4521.61 4599.91 6574.66 6594.41 6575 .63 4728.78 8602 .10 56 .39 36 .08 4573.73 4652.03 6651.52 6672.16 6652 .69 4791.43 8696 .21 57 .08 36 .16 4625.35 4703.65 6729.27 6750.85 6730 .65 4854.99 3643.13 3704.50 3764.23 3822.73 3879.31 3936.31 3993.66 4051.74 4109.21 4166.29 4223.29 4277.88 4329.62 4378.50 4426.35 4474.58 4522.68 4569.20 4615.24 4661.63 2.83 5982046.32 1.71 5982106.82 1.65 5982168.28 1.38 5982230.24 0.07 5982290.95 0.18 5982352.38 0.25 5982414.10 0.59 5982475.69 0.85 5982536.89 0.16 5982598.42 2.03 5982659.34 2.88 5982719.45 2.85 5982781.55 1.07 5982844.47 1.66 5982907.48 0.64 5982970.82 0.13 5983033.88 1.68 5983096.05 0.64 5983159.20 0.74 5983223.27 8789.37 57.96 35.21 4675.38 4753.68 6806.81 6829.43 6808.45 4918.83 4707.46 1.28 5983287.60 8882.83 58.36 36.12 4724.69 4802.99 6885.16 6908.83 6887.07 4983.33 4753.76 0.93 5983352.61 Last MWD+IFR+MS 8959.46 59.06 35.99 4764.48 4842.78 6949.85 6974.31 6951.99 5036.27 4792.30 0.92 5983405.97 TD (Projected) 9020.00 59.06 35.99 4795.61 4873.91 7001.13 7026.24 7003.46 5078.28 4822.81 0.00 5983448.32 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) MWD +IFR + MS - (In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) L_ egal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 2594 FSL 3603 FEL S34 T12N Ri 1 E UM 5978317.21 583310.85 BHL : 2391 FSL 4051 FEL S26 T12N Ri 1 E UM 5983448.32 588076.45 586473.07 N 70 21 34.906 W 149 17 51.397 586533.26 N 70 21 35.484 W 149 17 49.617 586593.54 N 70 21 36.048 W 149 17 47.835 586658.74 N 70 21 36.646 W 149 17 45.908 586722.17 N 70 21 37.212 W 149 17 44.034 586786.30 N 70 21 37.777 W 149 17 42.139 586849.95 N 70 21 38.333 W 149 17 40.258 586912.40 N 70 21 38.894 W 149 17 38.412 586973.09 N 70 21 39.482 W 149 17 36.617 587032.14 N 70 21 40.079 W 149 17 34.870 587089.95 N 70 21 40.682 W 149 17 33.158 587145.85 N 70 21 41.273 W 149 17 31„~ 587202.17 N 70 21 41.871 W 149 17 2~ 587258.83 N 70 21 42.471 W 149 17 28.157 587316.22 N 70 21 43.070 W 149 17 26.458 587373.01 N 70 21 43.666 W 149 17 24.776 587429.40 N 70 21 44.264 W 149 17 23.107 587485.73 587539.65 587590.70 587638.87 587686.02 587733.54 587780.94 587826.76 587872.10 587917.78 587962.90 588008.47 588046.41 588076.45 N 70 21 44.857 W 149 17 21.439 N 70 21 45.442 W 149 17 19.841 N 70 21 46.047 W 149 17 18.327 N 70 21 46.660 W 149 17 16.897 N 70 21 47.274 W 14917 15.497 N 70 21 47.892 W 149 17 14.085 N 70 21 48.507 W 14917 12.677 N 70 21 49.113 W 14917 11.316 N 70 21 49.729 W 149 17 9.968 N 70 21 50.354 W 14917 8.611 N 70 21 50.981 W 14917 7.269 N702151.615 W149175.914 N 70 21 52.136 W 1491 N 70 21 52.549 W 1491 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-215\L-215\L-215\L-215-1 Generated 10/25/2005 2:24 PM Page 3 of 3 3655.88 3696.25 3733.27 3769.80 3806.20 3842.41 3880.10 3919.44 3960.74 4002.00 4043.73 4085.68 4127.62 4169.31 4211.14 4752.24 4841.85 4927.87 5014.36 5099.78 5184.73 5270.43 5355.66 5440.39 5522.88 5606.19 5689.94 5774.11 5857.58 5941.00 4767.32 4752.57 3399.68 3321 .00 1.00 5981753.28 4857.00 4842.13 3460.52 3386 .89 0.39 5981814.84 4943.14 4928.10 3518.09 3450 .96 2.17 5981873.12 5029.79 5014.54 3575.63 3515 .75 1.11 5981931.37 5115.39 5099.92 3632.15 3580 .04 1.30 5981988.59 5200.45 5286.16 5371.39 5456.14 5538.68 5622.02 5705.82 5790.01 5873.51 5956.98 L-215PB1 Su ~R 4 ~~ ~ N Report ~~ - ~;~~~ ~~~.r~~ Report Date: 10-Sep-05 Survey /DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 45.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 it, E 0.000 ft Structure /Slot: L-PAD / L-215 TVD Reference Datum: Rotary Table Well: L-215 TVD Reference Elevation: 78.30 ft relative to MSL Borehole: L-215P61 Sea Bed /Ground Level Elevation: 49.80 ft relative to MSL UWI/APIA: 500292327470 Magnetic Declination: 24.491 ° Survey Name I Date: L-215P61 /September 10, 2005 Total Field Strength: 57575.814 nT Tort /AHD / DDI / ERD ratio: 96.257° / 2812.92 ft / 5.630 / 1.036 Magnetic Dip: 80.846° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: September 07, 2005 Location Lat/LOng: N 70 21 2.620, W 14919 24.936 Magnetic Declination Model: BGGM 2005 Location Grid NIE Y/X: N 5978317.210 ftUS, E 583310.850 ftUS North Reference: True North Grid Convergence Angle: +0.63702199° Total Corr Mag North -> True North: +24.491 ° Grid Scale Factor: 0.99990788 Local Coordinates Referenced 70: Well Head • Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS H I t U.UU U.UU U.UU -/B.;iU U.UU U.UU U.UU U.UU U.UU O.UU U.UU 59/831 /.21 b8331U.8b N /U "Ll "L.62U W 149 19'14.9:16 First GYD GC SS 100.00 0.37 263.62 21.70 100.00 -0.25 0.32 0.32 -0.04 -0.32 0.37 5978317.17 583310.53 N 70 21 2.619 W 149 19 24.945 200.00 0.50 284.65 121.70 200.00 -0.73 1.07 1.06 0.04 -1.06 0.20 5978317.24 583309.79 N 70 21 2.620 W 149 19 24.967 300.00 0.88 306.29 221.69 299.99 -1.06 2.26 2.19 0.60 -2.11 0.45 5978317.79 583308.74 N 70 21 2.626 W 149 19 24.997 400.00 2.39 346.42 321.65 399.95 -0.09 5.02 4.45 3.08 -3.21 1.81 5978320.26 583307.60 N 70 21 2.650 W 149 19 25.030 500.00 4.43 358.95 421.47 499.77 3.68 10.95 9.74 8.97 -3.77 2.16 5978326.14 583306.98 N 70 21 2.708 W 149 19 25.046 600.00 6.67 8.60 520.99 599.29 11.03 20.60 18.82 18.58 -2.98 2.42 5978335.75 583307.67 N 70 21 2.802 W 149 19 25.023 700.00 9.03 29.78 620.07 698.37 23.28 34.11 31.19 31.14 1.79 3.70 5978348.36 583312.30 N 70 21 2.926 W 149 19 24.883 800.00 12.57 36.17 718.29 796.59 41.62 52.82 48.28 46.74 12.11 3.73 5978364.08 583322.44 N 70 21 3.079 W 14919 24.582 900.00 16.01 45.32 815.19 893.49 66.17 77.45 71.12 65.23 28.35 4.11 5978382.74 583338.47 N 70 21 3.261 W 149 19 24.107 Last GYD GC SS 1000.00 21.77 48.93 909.77 988.07 98.49 109.81 101.54 87.13 52.16 5.87 5978404.90 583362.03 N 70 21 3.477 W 149 19 First MWD+IFR+MS 1040.13 24.00 48.98 946.74 1025.04 114.05 125.41 116.48 97.37 63.93 5.56 5978415.28 583373.68 N 70 21 3.577 W 149 19 1132.84 27.54 47.31 1030.21 1108.51 154.29 165.71 155.78 124.29 93.91 3.90 5978442.52 583403.37 N 70 21 3.842 W 149 19 2 1 1226.75 31.23 46.69 1112.03 1190.33 200.34 211.78 201.32 155.72 127.60 3.94 5978474.32 583436.70 N 70 21 4.151 W 149 19 21.207 1320.65 34.86 45.84 1190.73 1269.03 251.52 262.97 252.22 191.12 164.58 3.90 5978510.13 583473.28 N 70 21 4.499 W 149 19 20.126 1413.97 39.42 45.01 1265.10 1343.40 307.84 319.30 308.39 230.67 204.68 4.92 5978550.12 583512.94 N 70 21 4.888 W 1491918.954 1508.15 43.89 44.17 1335.45 1413.75 370.42 381.88 370.90 275.25 248.60 4.78 5978595.18 583556.35 N 70 21 5.327 W 149 19 17.670 1604.10 49.95 45.64 1400.96 1479.26 440.47 451.93 440.87 324.83 298.08 6.41 5978645.30 583605.27 N 70 21 5.814 W 149 19 16.224 1695.33 51.49 45.75 1458.71 1537.01 511.08 522.54 511.40 374.15 348.62 1.69 5978695.18 583655.25 N 70 21 6.299 W 149 19 14.747 1790.21 50.38 45.76 1518.51 1596.81 584.74 596.21 584.99 425.55 401.39 1.17 5978747.16 583707.45 N 70 21 6.805 W 149 19 13.204 1882.97 52.44 45.81 1576.36 1654.66 657.23 668.71 657.43 476.11 453.35 2.22 5978798.29 583758.84 N 70 21 7.302 W 14919 11.686 1976.30 54.72 46.52 1631.77 1710.07 732.31 743.81 732.45 528.12 507.53 2.52 5978850.89 583812.43 N 70 21 7.813 W 14919 10.102 2070.46 56.57 47.11 1684.90 1763.20 810.00 821.54 810.09 581.31 564.21 2.03 5978904.70 583868.51 N 70 21 8.337 W 14919 8.446 SurveyEditor Ver SP 1.0 Bld( doc4Ox_56) L-215\L-215\L-215PB1\L-215PB1 Generated 10/25/2005 2:24 PM Page 1 of 2 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 11t3:i. // tiU.Uy 4ti.5U 1/:i:i .tStS 1131L.lt3 2StSy.:3li yUU.y4 t313y.41 ti~5.ti1 kiLL.14 :i.tSU 5y/13y5y.ti4 2257. 60 65.44 44 .90 1776 .81 1855.11 972.75 984.34 972.79 693.82 681.85 5.92 5979018.51 2347. 81 64.50 44. 92 1814 .98 1893.28 1054.49 1066.07 1054.52 751.71 739.56 1.04 5979077.03 2440. 30 65.46 45. 87 1854 .10 1932.40 1138.29 1149.88 1138.32 810.56 799.23 1.39 5979136.53 2536. 80 64.81 45. 43 1894 .67 1972.97 1225.84 1237.44 1225.86 871.76 861.83 0.79 5979198.42 2630. 54 65.73 46. 67 1933 .89 2012.19 1310.97 1322.58 1310.98 930.85 923.13 1.55 5979258.18 2724. 64 65.10 46. 53 1973 .04 2051.34 1396.50 1408.15 1396.50 989.65 985.31 0.68 5979317.65 2818. 56 64.77 46. 04 2012 .83 2091.13 1481.55 1493.22 1481.56 1048.44 1046.80 0.59 5979377.12 2911. 80 63.42 45. 70 2053 .56 2131.86 1565.41 1577.09 1565.41 1106.83 1107.00 1.48 5979436.18 3005. 33 65.78 45. 73 2093 .68 2171.98 1649.89 1661.57 1649.89 1165.82 1167.48 2.52 5979495.83 3099. 13 64.78 45. 69 2132 .90 2211.20 1735.09 1746.78 1735.09 1225.32 1228.47 1.07 5979555.99 3191. 99 66.71 45. 69 2171 .05 2249.35 1819.74 1831.44 1819.74 1284.46 1289.04 2.08 5979615.80 3286. 32 65.00 45. 76 2209 .63 2287.93 1905.81 1917.51 1905.81 1344.55 1350.67 1.81 5979676.56 3379. 17 64.15 45. 55 2249 .49 2327.79 1989.66 2001.37 1989.67 1403.16 1410.64 0.94 5979735.83 3471. 61 65.41 45. 58 2288 .88 2367.18 2073.28 2084.99 2073.29 1461.71 1470.36 1.36 5979795.03 3566. 57 64.04 45. 01 2329 .42 2407.72 2159.15 2170.86 2159.16 1522.11 1531.39 1.54 5979856.10 3660. 28 63.55 45. 26 2370 .81 2449.11 2243.22 2254.94 2243.23 1581.42 1590.98 0.58 5979916.07 3753. 40 65.21 45. 14 2411 .07 2489.37 2327.19 2338.90 2327.20 1640.58 1650.56 1.79 5979975.89 3846. 48 64.60 45. 06 2450 .55 2528.85 2411.48 2423.19 2411.49 1700.08 1710.26 0.66 5980036.04 3940. 44 63.69 44. 73 2491 .52 2569.82 2496.03 2507.75 2496.04 1759.98 1769.94 1.02 5980096.59 4033. 05 64.19 45. 04 2532 .21 2610.51 2579.23 2590.94 2579.24 1818.92 1828.65 0.62 5980156.18 4127. 44 63.45 45. 00 2573 .85 2652.15 2663.93 2675.65 2663.94 1878.80 1888.57 0.78 5980216.71 Last MWD+IFR+MS 4218. 92 65.57 45. 61 2613 .22 2691.52 2746.50 2758.22 2746.51 1936.87 1947.27 2.39 5980275.43 TD (Projected) 4279. 00 65.57 45. 61 2638 .06 2716.36 2801.20 2812.92 2801.21 1975.14 1986.36 0.00 5980314.12 Survey Type: Definitive Survey NOTES: GYD GC SS - ( Gyrodata - gyro single shot s -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees incl ination. ) MWD +I FR + MS - (In-field referen ced MWD with mull-station analysis and correction applied in post-pro cessing. Assumes a BHA sag correction is appl ied to enh ance inclination accuracy. ) Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 2594 FSL 3603 FEL S34 T12N R 11 E UM 5978317.21 583310.85 BHL : 4569 FSL 1613 FEL S34 T12N R 11 E UM 5980314.12 585274.94 5t3~y"15.13'1 N /U'Ll ts.tl/1 W 14y ly(i./51 583984.88 N 70 21 9.443 W 149 19 5.007 584041.93 N 70 21 10.012 W 149 19 3.320 584100.94 N 70 21 10.591 W 149 191.576 584162.86 N 70 21 11.193 W 149 18 59.746 584223.49 N 70 21 11.774 W 149 18 57.954 584285.00 N 70 21 12.352 W 149 18 56.136 584345.83 N 70 21 12.930 W 149 18 54.339 584405.37 N 70 21 13.504 W 149 18 52.579 584465.18 N 70 21 14.084 W 149 18 5 11 584525.50 N 70 21 14.670 W 149 18 584585.41 N 70 21 15.251 W 149 18 7 584646.37 N 70 21 15.842 W 149 18 45.455 584705.67 N 70 21 16.418 W 149 18 43.702 584764.73 N 70 21 16.994 W 149 18 41.956 584825.08 N 70 21 17.588 W 14918 40.172 584884.00 N 70 21 18.171 W 149 18 38.429 584942.91 N 70 21 18.753 W 149 18 36.688 585001.95 N 70 21 19.338 W 149 18 34.942 585060.95 N 70 21 19.927 W 149 18 33.197 585119.00 N 70 21 20.506 W 149 18 31.480 585178.24 N 70 21 21.095 W 149 18 29.728 585236.28 N 70 21 21.666 W 149 18 28.012 585274.94 N 70 21 22.042 W 149 18 26.869 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-215\L-215\L-215P61\L-215P61 Generated 10/25/2005 2:24 PM Page 2 of 2 _ . __ _ _ _ _ Schlumberger by L-1'15t't3[ auryey rceport Report Date: 17-Sep-05 Survey / DLS Computation Method: Minimum Curvature / LubinsKi Client: BP Exploration Alaska Vertical Section Azimuth: 45.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: L-PAD / L-215 TVD Reference Datum: Rotary Table Well: L-215 TVD Reference Elevation: 78.30 ft relative to MSL Borehole: L-215PB2 Sea Bed /Ground Level Elevation: 49.80 ft relative to MSL UWI/API#: 500292327470 Magnetic Declination: 24.491 ° Survey Name /Date: L-215PB2 /September 17, 2005 Total Field Strength: 57575.814 nT Tort IAHD / DDI I ERD ratio: 280.654° / 10748.22 ft / 6.892 / 2.207 Magnetic Dip: 80.846° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: September 07, 2005 Location LaUlong: N 70 21 2.620, W 14919 24.936 Magnetic Declination Model: BGGM 2005 Location Grid NIE YIX: N 5978317.210 ftUS, E 583310.850 ftUS North Reference: True North Grid Convergence Angle: +0.63702199° Total Corr Mag North -> True North: +24.491 ° Grid Scale Factor: 0.99990788 Local Coordinates Referenced To: Well Head • Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft tt ft tt ft tt ft de /100 k ttUS ttUS ,. nn ~Q an n nn n nn n nn n nn n_00 0.00 0.00 5978317.21 583310.85 N 70 21 2.620 W 149 19 24.936 K I t First GYD GC SS v.vv 100.00 v.vv 0.37 263.62 21.70 100.00 -0.25 0.32 0.32 -0.04 -0.32 0.37 5978317.17 583310.53 N 70 21 2.619 W 149 19 24.945 200 00 0.50 284.65 121.70 200.00 -0.73 1.07 1.06 0.04 -1.06 0.20 5978317.24 583309.79 N 70 21 2.620 W 149 19 24.967 . 300 00 0.88 306.29 221.69 299.99 -1.06 2.26 2.19 0.60 -2.11 0.45 5978317.79 583308.74 N 70 21 2.626 W 149 19 24.997 . 400.00 2.39 346.42 321.65 399.95 -0.09 5.02 4.45 3.08 -3.21 1.81 5978320.26 583307.60 N 70 21 2.650 W 149 19 25.030 500 00 4.43 358.95 421.47 499.77 3.68 10.95 9.74 8.97 -3.77 2.16 5978326.14 583306.98 N 70 21 2.708 W 149 19 25.046 . 00 600 6.67 8.60 520.99 599.29 11.03 20.60 18.82 18.58 -2.98 2.42 5978335.75 583307.67 N 70 21 2.802 W 149 19 25.023 . 700 00 9.03 29.78 620.07 698.37 23.28 34.11 31.19 31.14 1.79 3.70 5978348.36 583312.30 N 70 21 2.926 W 149 19 24.883 . 00 800 12.57 36.17 718.29 796.59 41.62 52.82 48.28 46.74 12.11 3.73 5978364.08 583322.44 N 70 21 3.079 W 149 19 24.582 . 900.00 16.01 45.32 815.19 893.49 66.17 77.45 71.12 65.23 28.35 4.11 5978382.74 583338.47 N 70 21 3.261 W 149 19 24.107 Last GYD GC SS 1000.00 21.77 48.93 909.77 988.07 98.49 109.81 101.54 87.13 52.16 5.87 5978404.90 583362.03 N 70 21 3.477 W 149 19 23 12 First MWD+IFR+MS 1040.13 24.00 48.98 946.74 1025.04 114.05 125.41 116.48 97.37 63.93 5.56 5978415.28 583373.68 N 70 21 3.577 W 149 19 1132 84 27.54 47.31 1030.21 1108.51 154.29 165.71 155.78 124.29 93.91 3.90 5978442.52 583403.37 N 70 21 3.842 W 149 19 . 75 1226 31.23 46.69 1112.03 1190.33 200.34 211.78 201.32 155.72 127.60 3.94 5978474.32 583436.70 N 70 21 4.151 W 149 19 21.207 . 1320.65 34.86 45.84 1190.73 1269.03 251.52 262.97 252.22 191.12 164.58 3.90 5978510.13 583473.28 N 70 21 4.499 W 149 19 20.126 97 1413 39.42 45.01 1265.10 1343.40 307.84 319.30 308.39 230.67 204.68 4.92 5978550.12 583512.94 N 70 21 4.888 W 149 19 18.954 . 15 1508 43.89 44.17 1335.45 1413.75 370.42 381.88 370.90 275.25 248.60 4.78 5978595.18 583556.35 N 70 21 5.327 W 149 19 17.670 . 1604 10 95 49 45.64 1400.96 1479.26 440.47 451.93 440.87 324.83 298.08 6.41 5978645.30 583605.27 N 70 21 5.814 W 149 19 16.224 . 1695 33 . 49 51 45.75 1458.71 1537.01 511.08 522.54 511.40 374.15 348.62 1.69 5978695.18 583655.25 N 70 21 6.299 W 149 19 14.747 . 1790.21 . 50.38 45.76 1518.51 1596.81 584.74 596.21 584.99 425.55 401.39 1.17 5978747.16 583707.45 N 70 21 6.805 W 149 19 13.204 97 1882 52.44 45.81 1576.36 1654.66 657.23 668.71 657.43 476.11 453.35 2.22 5978798.29 583758.84 N 70 21 7.302 W 149 19 11.686 . 1976 30 72 54 46.52 1631.77 1710.07 732.31 743.81 732.45 528.12 507.53 2.52 5978850.89 583812.43 N 70 21 7.813 W 149 19 10.102 Tie-In Survey . 2070.46 . 56.57 47.11 1684.90 1763.20 810.00 821.54 810.09 581.31 564.21 2.03 5978904.70 583868.51 N 70 21 8.337 W 149 19 8.446 MWD+IFR+MS 2163.54 59.17 46.84 1734.40 1812.70 888.77 900.36 888.82 635.09 621.82 2.80 5978959.11 583925.52 N 70 21 8.865 W 149 19 6.761 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-215\L-215\L-215P62\L-215P62 Generated 9/26/2005 3:33 PM Page 1 of 5 Comments Measured Inclination Azimuth Subsea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft k k k ft ft ft de 100 k ftUS ftUS nn o ca cn7nn~a ao ~azoad ~a ni 7n 91 4 d1F W 1d9 1A 5 n99 ZZbb.tlb OL.DO 40.9.7 i i i ~.oc i ow. i s 2349.15 64.96 45.01 1820.63 1898.93 2444.03 66.18 44.45 1859.87 1938.17 2537.77 64.79 44.91 1898.77 1977.07 2630.87 65.82 45.11 1937.66 2015.96 2724.95 65.06 44.31 1976.77 2055.07 2818.40 63.66 44.35 2017.20 2095.50 2911.33 63.36 46.98 2058.66 2136.96 3004.77 65.10 44.38 2099.29 2177.59 3098.19 64.30 44.40 2139.21 2217.51 3190.86 65.43 41.11 2178.58 2256.88 3284.89 63.58 41.59 2219.05 2297.35 3378.06 64.43 41.15 2259.89 2338.19 3471.06 65.46 41.63 2299.27 2377.57 3565.75 64.40 42.18 2339.40 2417.70 3659.61 65.94 41.34 2378.81 2457.11 3753.02 65.06 41.90 2417.55 2495.85 3846.23 64.40 40.71 2457.34 2535.64 3940.58 65.77 42.43 2497.08 2575.38 4033.73 64.65 41.84 2536.14 2614.44 4126.62 64.08 41.45 2576.33 2654.63 4177.75 64.30 41.47 2598.59 2676.89 4251.06 62.97 40.46 2631.15 2709.45 4295.17 62.83 40.63 2651.24 2729.54 4389.18 63.94 43.02 2693.36 2771.66 4482.39 63.94 43.56 2734.31 2812.61 4575.55 64.94 45.04 2774.51 2852.81 4668.57 64.52 44.80 2814.21 2892.51 4761.94 63.27 44.76 2855.30 2933.60 4854.01 65.50 45.61 2895.10 2973.40 4950.17 63.10 45.73 2936.80 3015.10 5047.85 60.90 47.87 2982.66 3060.96 5141.64 63.15 50.31 3026.65 3104.95 5235.86 63.78 50.15 3068.75 3147.05 5329.38 65.07 49.29 3109.12 3187.42 5423.24 64.17 47.49 3149.35 3227.65 5516.69 66.24 43.93 3188.55 3266.85 5610.09 65.94 43.59 3226.40 3304.70 5703.43 65.70 45.53 3264.64 3342.94 5796.40 66.02 44.54 3302.66 3380.96 5890.38 64.13 44.76 3342.27 3420.57 1053.00 1064.63 1053.02 748.79 740.38 2.97 5979074.11 584042.79 N 70 21 9.984 W 149 19 3.296 1139.38 1151.01 1139.40 810.16 801.17 1.39 5979136.15 584102.89 N 70 21 10.587 W 149 19 1.519 1224.67 1236.30 1224.69 870.80 861.14 1.55 5979197.45 584162.18 N 70 21 11.183 W 149 18 59.766 1309.25 1320.88 1309.27 930.60 920.96 1.12 5979257.90 584221.32 N 70 21 11.771 W 149 18 58.017 1394.82 1406.45 1394.84 991.41 981.16 1.12 5979319.37 584280.84 N 70 21 12.369 W 149 18 56.257 1479.06 1490.70 1479.08 1051.67 1040.03 1.50 5979380.28 584339.03 N 70 21 12.962 W 149 18 54.536 1562.22 1573.87 1562.23 1109.79 1099.51 2.55 5979439.05 584397,86 N 70 21 13.534 W 149 18 52.798 1646.35 1658.01 1646.36 1168.59 1159.70 3.12 5979498.51 584457,38 N 70 21 14.112 W 149 18 51.038 1730.80 1742.47 1730.81 1228.94 1218.78 0.86 5979559.51 584515.78 N 70 21 14.705 W 149 18 49.311 1814 61 1826 36 1814.64 1290.54 1275.71 3.44 5979621.73 584572.02 N 70 21 15.311 W 149 18 47.646 . . 1899.31 1911.23 1899.38 1354.25 1331.78 2.02 5979686.05 584627.37 N 70 21 15.937 W 149 18 46~ 1982.89 1994.97 1983.00 1417.09 1387.13 1.01 5979749.50 584682.01 N 70 21 16.555 W 149 18 44.389 2066.97 2079.22 2067.14 1480.30 1442.83 1.20 5979813.32 584737.00 N 70 21 17.177 W 149 18 42.760 2152.61 2164.99 2152.83 1544.13 1500.11 1.24 5979877.78 584793.56 N 70 21 17.805 W 149 18 41.086 2237.65 2250.17 2237.94 1607.67 1556.84 1.83 5979941.94 584849.58 N 70 21 18.429 W 149 18 39.427 2322.50 2335.16 2322.86 1671.22 1613.30 1.09' 5980006.10 584905.32 N 70 21 19.054 W 149 18 37.776 2406.61 2419.45 2407.06 1734.53 1668.93 1.35 5980070.03 584960.24 N 70 21 19.677 W 149 18 36.150 2492.02 2505.02 2492.56 1798.54 1725.71 2.20 5980134.66 585016.30 N 70 21 20.306 W 149 18 34.489 2576.48 2589.59 2577.09 1861.25 1782.45 1.33 5980197.99 585072.33 N 70 21 20.923 W 149 18 32.831 2660.09 2673.33 2660.78 1923.83 1838.10 0.72 5980261.18 585127.27 N 70 21 21.538 W 149 18 31.203 2706.03 2719.36 2706.77 1958.33 1868.57 0.43 5980296.00 585157.36 N 70 21 21.877 W 149 18 30.312 2771.55 2785.04 2772.38 2007.92 1911.64 2.19 5980346.07 585199.87 N 70 21 22.365 W 149 18 29.053 2810.70 2824.31 2811.60 2037.76 1937.16 0.47 5980376.19 585225.06 N 70 21 22.658 W 149 18 28.307 2894.61 2908.36 2895.60 2100.38 1993.21 2.56 5980439.42 585280.40 N 70 21 23.274 W 149 18 26.668 2978.30 2992.09 2979.33 2161.33 2050.63 0.52 5980501.00 585337.13 N 70 21 23.873 W 149 18 24.989 3062.33 3076.13 3063.36 2221.47 2109.32 1.79 5980561.78 585395.15 N 70 21 24.465 W 149 18 23.272 3146.45 3160.25 3147.45 2281.03 2168.72 0.51 5980622.00 585453.87 N 70 21 25.050 W 149 18 21.535 3230.29 3244.09 3231.28 2340.55 2227.78 1.34 5980682.16 585512.26 N 70 21 25.635 W 149 18 1 3313.31 3327.11 3314.26 2399.05 2286.67 2.56 5980741.31 585570.50 N 70 21 26.211 W 149 18 3399.94 3413.75 3400.85 2459.60 2348.65 2.50 5980802.54 585631.79 N 70 21 26.806 W 149 18 1 4 3486.14 3499.99 3486.96 2518.64 2411.50 2.97 5980862.27 585693.97 N 70 21 27.386 W 149 18 14.436 3568.74 3582.81 3569.42 2572.86 2474.10 3.32 5980917.18 585755.96 N 70 21 27.919 W 149 18 12.605 3652.68 3667.10 3653.21 2626.79 2538.89 0.69 5980971.81 585820.14 N 70 21 28.450 W 149 18 10.710 3736.75 3751.46 3737,16 2681.33 2603.24 1.61 5981027.06 585883.88 N 70 21 28.986 W 149 18 8.828 3821.40 3836.26 3821,73 2737.63 2666.64 1.98 5981084.06 585946.64 N 70 21 29.539 W 149 18 6.974 3906.21 3921.08 3906.51 2796.87 2727.34 4.11 5981143.96 586006.67 N 70 21 30.122 W 149 18 5.199 3991.57 4006.47 3991.90 2858.54 2786.39 0.46 5981206.28 586065.03 N 70 21 30.728 W 149 18 3.472 4076.71 4091.62 4077,04 2919.21 2846.14 1.91 5981267.60 586124.09 N 70 21 31.324 W 149 18 1.725 4161.55 4176.46 4161.87 2979.16 2906.16 1.03 5981328.21 586183.44 N 70 21 31.914 W 149 17 59.969 4246.77 4261.68 4247.09 3039.79 2966.05 2.02 5981389.50 586242.65 N 70 21 32.510 W 149 17 58.217 SurveyEditor Ver SP 1.0 Bld(doc40x_56) L-215\L-215\L-215P62\L-215P62 Generated 9/26/2005 3:33 PM Page 2 of 5 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft h h ft tt ft K de 100 ft kUS ttUS o~.,n on onnn ~c ~ 7~ ~on~n~9 ~~ riRR'2M n7 N 7n 71 ~~ 11n W 1dQ 17.riR 51fi oaoo.yi 21 6076 o~.o~ 64.73 Y~.-.~ 43.30 .,.,., ~.~., 3420.81 ..-...... ~., 3499.11 ~.,.,...,., 4415.10 .......... 4430.09 .__ .._ . 4415.47 - ------ 3162.47 - -.. 3081.42 1.22 5981513.44 586356.63 N 70 21 33.716 W 149 17 54.843 . 6169.70 64.73 43.94 3460.72 3539.02 4499.61 4514.64 4500.01 3223.67 3139.74 0.62 5981575.28 586414.27 N 70 21 34.318 W 149 17 53.137 6262.82 65.26 45.69 3500.08 3578.38 4584.00 4599.03 4584.39 3283.53 3199.22 1.80 5981635.80 586473.07 N 70 21 34.906 W 149 17 51.397 6356.02 65.11 46.30 3539.20 3617.50 4668.58 4683.62 4668.94 3342.30 3260.07 0.62 5981695.23 586533.26 N 70 21 35.484 W 149 17 49.617 6448 10 65.62 47.14 3577.58 3655.88 4752.24 4767.32 4752.57 3399.68 3321.00 1.00 5981753.28 586593.54 N 70 21 36.048 W 149 17 47.835 . 6541.42 65.60 47.70 3616.11 3694.41 4837.16 4852.31 4837.44 3457.19 3383.59 0.55 5981811.47 586655.48 N 70 21 36.613 W 149 17 46.004 6634.75 70.78 51.05 3650.79 3729.09 4923.51 4938.93 4923.72 3513.54 3449.35 6.47 5981868.55 586720.60 N 70 21 37.167 W 149 17 44.081 6728 50 74.11 53.25 3679.06 3757.36 5012.17 5028.30 5012.29 3568.36 3519.92 4.20 5981924.15 586790.55 N 70 21 37.706 W 149 17 42.017 . 6821.58 73.80 55.12 3704.79 3783.09 5100.48 5117.75 5100.52 3620.71 3592.46 1.96 5981977.29 586862.50 N 70 21 38.220 W 149 17 39.895 6915.49 73.91 55.67 3730.90 3809.20 5189.20 5207.96 5189.20 3671.94 3666.70 0.57 5982029.34 586936.16 N 70 21 38.724 W 149 17 37.723 7007.80 73.54 55.53 3756.77 3835.07 5276.30 5296.57 5276.32 3722.00 3739.82 0.43 5982080.20 587008.71 N 70 21 39.216 W 149 17 35~ 7101.61 73.22 54.69 3783.61 3861.91 5364.79 5386.46 5364.87 3773.42 3813.55 0.92 5982132.43 587081.86 N 70 21 39.721 W 149 17 33. 7195 31 72.76 55.16 3811.02 3889.32 5453.05 5476.06 5453.23 3824.90 3886.88 0.69 5982184.73 587154.60 N 70 21 40.227 W 149 17 31.283 . 7289.04 71.40 54.39 3839.86 3918.16 5540.94 5565.24 5541.25 3876.34 3959.73 1.65 5982236.97 587226.87 N 70 21 40.733 W 149 17 29.152 7382.85 72.45 55.75 3868.96 3947.26 5628.74 5654.42 5629.24 3927.40 4032.84 1.78 5982288.83 587299.41 N 70 21 41.234 W 149 17 27.014 7476 26 72.00 56.56 3897.48 3975.78 5716.01 5743.37 5716.75 3976.94 4106.72 0.96 5982339.18 587372.72 N 70 21 41.721 W 149 17 24.853 . 7570 44 74.69 54.39 3924.47 4002.77 5804.72 5833.59 5805.73 4028.08 4181.04 3.61 5982391.14 587446.46 N 70 21 42.224 W 149 17 22.679 . 7664.10 73.86 53.78 3949.86 4028.16 5893.75 5923.74 5895.02 4080.96 4254.05 1.09 5982444.83 587518.87 N 70 21 42.743 W 149 17 20.543 7757.69 73.57 52.25 3976.10 4054.40 5982.70 6013.58 5984.22 4135.00 4325.81 1.60 5982499.66 587590.02 N 70 21 43.275 W 149 17 18.444 43 7851 75.89 49.87 4000.79 4079.09 6072.61 6104.00 6074.33 4191.84 4396.13 3.48 5982557.27 587659.70 N 70 21 43.833 W 149 17 16.386 . 7944.24 74.17 48.96 4024.77 4103.07 6162.00 6193.66 6163.86 4250.17 4464.22 2.08 5982616.34 587727.13 N 70 21 44.406 W 149 17 14.394 8037.41 72.30 47.36 4051.64 4129.94 6251.07 6282.86 6253.02 4309.66 4530.68 2.59 5982676.57 587792.92 N 70 21 44.991 W 149 17 12.450 01 8131 73.15 46.59 4079.44 4157.74 6340.39 6372.24 6342.39 4370.65 4596.02 1.20 5982738.27 587857.57 N 70 21 45.590 W 149 17 10.538 . 8224.12 71.88 47.89 4107.41 4185.71 6429.13 6461.05 6431.19 4430.94 4661.22 1.91 5982799.28 587922.08 N 70 21 46.183 W 149 17 8.630 8317.49 74.39 48.12 4134.50 4212.80 6518.35 6550.39 6520.50 4490.72 4727.62 2.70 5982859.79 587987.81 N 70 21 46.771 W 149 17 6.687 8410.72 73.96 48.17 4159.92 4238.22 6607.91 6640.09 6610.16 4550.57 4794.43 0.46 5982920.37 588053.95 N 70 21 47.359 W 149 17 4.733 29 8504 72.90 48.54 4186.61 4264.91 6697.44 6729.77 6699.80 4610.17 4861.45 1.19 5982980.70 588120.29 N 70 21 47.944 W 149 17 2.772 . 8598.01 72.80 48.98 4214.24 4292.54 6786.80 6819.33 6789.28 4669.20 4928.79 0.46. 5983040.47 588186.96 N 70 21 48.525 W 149 17 0.801 8690.12 74.02 46.59 4240.54 4318.84 6874.97 6907.60 6877.53 4728.51 4994.16 2.82 5983100.50 588251.66 N 70 21 49.108 W 149 16 5 8783.60 73.07 46.01 4267.02 4345.32 6964.59 6997.25 6967.18 4790.45 5058.97 1.18 5983163.15 588315.78 N 70 21 49.716 W 149 16 5 . 37 8877 72.38 45.87 4294.87 4373.17 7054.12 7086.79 7056.71 4852.72 5123.32 0.75 5983226.12 588379.42 N 70 21 50.328 W 149 16 55.109 . 78 8970 72.84 45.14 4322.79 4401.09 7143.26 7175.93 7145.84 4915.19 5186.90 0.89 5983289.29 588442.30 N 70 21 50.942 W 149 16 53.248 . 77 9063 73.55 45.29 4349.67 4427.97 7232.27 7264.95 7234.83 4977.90 5250.08 0.78 5983352.70 588504.77 N 70 21 51.558 W 149 16 51.399 . 9158.00 72.98 45.32 4376.80 4455.10 7322.51 7355.19 7325.05 5041.37 5314.23 0.61 5983416.87 588568.21 N 70 21 52.182 W 149 16 49.522 9251.18 73.15 46.46 4403.95 4482.25 7411.64 7444.32 7414.18 5103.41 5378.23 1.18 5983479.61 588631.51 N 70 21 52.792 W 149 16 47.649 9344.46 72.31 46.41 4431.64 4509.94 7500.68 7533.40 7503.26 5164.80 5442.77 0.90 5983541.71 588695.36 N 70 21 53.395 W 149 16 45.760 67 9437 71.42 47.48 4460.65 4538.95 7589.21 7621.98 7591.83 5225.27 5507.49 1.45 5983602.89 588759.40 N 70 21 53.990 W 149 16 43.866 . 17 9531 70.87 50.76 4490.88 4569.18 7677.45 7710.46 7680.21 5283.17 5574.38 3.37 5983661.53 588825.63 N 70 21 54.558 W 149 16 41.909 . 9624.22 72.50 52.99 4520.12 4598.42 7765.14 7798.79 7768.16 5337.70 5643.87 2.87 5983716.82 588894.50 N 70 21 55.094 W 149 16 39.875 9716 44 72.45 53.10 4547.89 4626.19 7852.21 7886.73 7855.55 5390.57 5714.14 0.13 5983770.46 588964,18 N 70 21 55.614 W 149 16 37.819 . 9810.26 72.77 52.97 4575.93 4654.23 7940.87 7976.26 7944.53 5444.40 5785.68 0.37 5983825.08 589035.10 N 70 21 56.143 W 149 16 35.726 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-215\L-215\L-215PB2\L-215P62 Generated 9/26/2005 3:33 PM Page 3 of 5 Comments Measured Inclination Azimuth SutrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft n ~n ftUS cno~o~n oc ftUS ~noa nF FR nl 7n 77 r.R RRR \A/ ~IdQ 1R Z~ Rd~ `JyUJ.OD /c.UO JJ. I ~ YVVY. IY 9997.70 75.49 53.92 4630.42 10091.43 78.14 52.19 4651.80 10183.06 81.57 52.72 4667.94 10276.83 82.35 52.16 4681.05 10370.16 84.82 53.17 4691.48 10464.28 89.49 51.73 4696.15 10498.60 90.37 51.34 4696.19 10529.59 89.92 51.41 4696.11 10557.77 89.63 51.33 4696.22 10588.86 88.63 51.24 4696.69 10620.16 87.25 49.62 4697.82 10651.29 86.19 48.98 4699.60 10681.53 85.24 48.49 4701.86 10713.53 84.18 48.91 4704.81 10744.67 84.96 50.71 4707.76 10778.29 86.44 52.13 4710.28 10809.10 86.11 52.61 4712.28 10838.16 87.22 53.07 4713.97 10869.59 87.50 53.24 4715.42 10901.32 86.82 52.96 4716.99 10931.50 86.07 53.08 4718.86 10962.67 87.07 53.46 4720.73 10994.20 11025.03 11056.44 11087.44 11117.80 11150.00 11181.36 11212.26 11242.19 11274.67 11305.37 11336.36 11367.17 11398.31 11429.67 11461.09 11491.76 11522.71 11554.33 87.05 53.50 4722.34 86.51 54.45 4724.08 87.90 55.62 4725.61 89.22 55.18 4726.39 88.87 54.74 4726.89 88.19 54.59 4727.72 87.70 54.43 4728.84 87.21 54.53 4730.21 86.96 54.80 4731.74 88.56 55.03 4733.01 90.33 55.59 4733.30 90.64 55.71 4733.04 89.93 55.30 4732.89 88.87 54.97 4733.21 87.19 55.48 4734.29 86.56 55.31 4736.00 85.33 54.63 4738.17 84.64 55.19 4740.88 83.75 54.48 4744.08 4708.72 8118 .30 8155.58 8122.69 4730.10 8208 .65 8246.83 8213.42 4746.24 8298 .07 8337.01 8303.19 4759.35 8390 .13 8429.86 8395.63 4769.78 8482 .04 8522.60 8487.93 4774.45 8575 .22 8616.57 8581.50 4774.49 8609 .32 8650.89 8615.73 4774.41 4774.52 4774.99 4776.12 4777.90 4780.16 4783.11 4786.06 4788.58 4790.58 8640.12 8681. 88 8668.12 8710. 06 8699.02 8741. 15 8730.16 8772 .43 8761.15 8803 .51 8791.24 8833 .66 8823.04 8865 .53 8853.93 8896 .53 8887.24 8930 .05 8917.73 8960 .80 8646.63 8674.74 8705.75 8736.98 8768.04 8798.18 8830.04 8861.01 8894.44 8925.07 4792.27 4793.72 4795.29 4797.16 4799.03 4800.64 4802.38 4803.91 4804.69 4805.19 4806.02 4807.14 4808.51 4810.04 4811.31 4811.60 4811.34 4811.19 4811.51 4812.59 4814.30 4816.47 4819.18 4822.38 8946.47 8989.81 8977. 55 9021.20 9008. 93 9052.89 9038. 75 9083.01 9069. 54 9114.13 9100. 69 9145.62 9131. 09 9176.40 9161 .98 9207.77 9192 .46 9238.76 9222 .36 9269.12 9254 .09 9301.30 9285 .00 9332.64 9315 .45 9363.51 9344 .92 9393.41 9376 .89 9425.86 9407. 09 9456.56 9437. 54 9487.55 9467. 84 9518.35 9498.49 9549.49 9529. 33 9580.83 9560. 19 9612.21 9590. 32 9642.80 9620. 69 9673.63 9651. 68 9705.09 8953.94 8985.18 9016.71 9046.69 9077.64 9108.95 9139.53 9170.63 9201.33 9231.43 5551.54 5606.39 5661.34 5717.94 5774.18 5831.46 5852.81 5872.15 5889.74 5909.19 5929.11 5949.38 5969.27 5990.30 6010.30 6031.20 6049.98 6067.50 6086.33 6105.35 6123.47 6142.08 6160.82 6178.92 6196.90 6214.50 6231.93 9263.37 6250.54 9294.48 6268.74 9325.13 6286.67 9354.79 6303.96 9386.99 6322.62 9417.41 6340.09 9448.10 6357.57 9478.63 6375.02 9509.51 6392.82 9540.58 6410.69 9571.68 6428.51 9602.03 6446.07 9632.63 6463.80 9663.86 6481.91 5929.47 3.73 5983933.80 589177.68 N 70 21 57.195 W 149 16 31.518 6002.39 3.35 5983989.45 589249.98 N 70 21 57.734 W 149 16 29.384 6073.89 3.79 5984045.19 589320.86 N 70 21 58.274 W 149 16 27.291 6147.50 1.02 5984102.60 589393.82 N 70 21 58.830 W 149 16 25.137 6221.23 2.86 5984159.65 589466.92 N 70 21 59.382 W 149 16 22.979 6295.74 5.19 5984217.75 589540.78 N 70 21 59.945 W 149 16 20.799 6322.61 2.80 5984239.39 589567.41 N 70 22 0.155 W 149 16 20.012 6346.82 1.47 5984259.00 589591.40 N 70 22 0.345 W 149 16 19.304 6368.83 1.07 5984276.84 589613.22 N 70 22 0.518 W 149 16 18.659 6393.09 3.23 5984296.55 589637.25 N 70 22 0.709 W 149 16 17.949 6417.20 6.80 5984316.74 589661.14 N 70 22 0.905 W 149 16 17~ 6440.76 3.98 5984337.26 589684.47 N 70 22 1.104 W 149 16 16 6463.43 3.53 5984357.40 589706.91 N 70 22 1.299 W 149 16 15.891 6487.37 3.56 5984378.69 589730.61 N 70 22 1.506 W 149 16 15.190 6511.05 6.28 5984398.95 589754.07 N 70 22 1.702 W 149 16 14.497 6537.25 6.09 5984420.15 589780.04 N 70 22 1.908 W 149 16 13.730 6561.60 1.89 5984439.19 589804.17 N 70 22 2.092 W 149 16 13.017 6584.72 4.13 5984456.96 589827.09 N 70 22 2.264 W 149 16 12.340 6609.85 1.04 5984476.07 589852.01 N 70 22 2.449 W 149 16 11.605 6635.19 2.32 5984495.37 589877.13 N 70 22 2.636 W 149 16 10.863 6659.25 2.52 5984513.76 589900.99 N 70 22 2.814 W 149 16 10.159 6684.19 3.43 5984532.64 589925.72 N 70 22 2.997 W 149 16 9.429 6709.49 0.14 5984551.66 589950.81 N 70 22 3.181 W 149 16 8.689 6734.39 3.54 5984570.04 589975.50 N 70 22 3.359 W 149 16 7.960 6760.10 5.78 5984588.30 590001.00 N 70 22 3.535 W 149 16 7.207 6785.61 4.49 5984606.17 590026.31 N 70 22 3.708 W 149 16 6.461 6810.46 1.85 5984623.88 590050.97 N 70 22 3.879 W 149 16 5.734 6836.72 2.16 5984642.78 590077.02 N 70 22 4.062 W 149 1 6862.24 1.64 5984661.26 590102.33 N 70 22 4.241 W 149 1 6887.36 1.62 5984679.47 590127.25 N 70 22 4.417 W 14916 6911.75 1.23 5984697.03 590151.44 N 70 22 4.587 W 149 16 2.769 6938.30 4.98 5984715.97 590177.78 N 70 22 4.770 W 149 16 1.992 6963.54 6.05 5984733.72 590202.83 N 70 22 4.942 W 149 16 1.253 6989.13 1.07 5984751.49 590228.21 N 70 22 5.113 W 149 16 0.504 7014.52 2.66 5984769.22 590253.41 N 70 22 5.285 W 149 15 59.761 7040.07 3.57 5984787.30 590278.75 N 70 22 5.460 W 149 15 59.013 7065.81 5.60 5984805.46 590304.29 N 70 22 5.635 W 149 15 58.260 7091.64 2.08 5984823.56 590329.92 N 70 22 5.810 W 149 15 57.504 7116.69 4.58 5984841.39 590354.77 N 70 22 5.983 W 149 15 56.771 7141.91 2.87 5984859.39 590379.79 N 70 22 6.157 W 149 15 56.032 7167.63 3.59 5984877.79 590405.30 N 70 22 6.335 W 149 15 55.279 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-215\L-215\L-215PB2\L-215P62 Generated 9/26/2005 3:33 PM Page 4 of 5 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft __ ft ._____ ft ______ ft ____._ ft ....... -... ft .. .....-.~ ft ~..... .,n de 100 ft non ftUS ~nononc nn ftUS cnnAnn cc l.I ~n 77C Can \n/~A~~~. GA FZ~. I I ~tS~.bU 11616.40 11647.53 11679.30 11710.37 11740.96 11772.96 11803.81 11834.71 11865.66 11896.68 11928.18 11958.83 11990.24 12022.56 12052.98 12084.49 12116.09 12146.73 12177.94 12209.63 12240.01 12270.73 12302.31 12333.82 12364.47 12396.02 12427.33 12458.46 12489.35 12520.27 aa.or oo.wo wrwr.oU 85.67 54.76 87.76 55.09 87.81 55.25 87.28 55.71 86.87 55.60 86.31 55.15 85.58 54.76 84.71 54.88 84.27 54.96 85.07 54.15 85.27 84.21 83.38 83.50 83.10 84.78 87.07 88.76 90.47 92.27 93.58 93.30 92.81 93.04 93.38 93.41 93.01 92.47 91.73 91.07 52.52 52.44 52.03 51.70 51.58 51.31 51.11 50.77 51.11 51.72 51.37 51.11 51.28 50.75 49.97 49.74 49.90 49.78 49.71 49.63 4750.36 4752.15 4753.38 4754.71 4756.27 4758.17 4760.35 4762.97 4765.94 4768.82 4771.47 4774.28 4777.68 4781.37 4784.92 4788.25 4790.49 4791.61 4791.82 4791.06 4789.51 4787.67 4785.98 4784.37 4782.66 4780.79 4779.04 4777.55 4776.42 4775.66 `FOLJ.OV ~VUL.JV 4828.66 9712.49 4830.45 9743.10 4831.68 9774.35 4833.01 9804.87 4834.57 9834.89 4836.47 9866.31 4838.65 9896.62 4841.27 9926.96 4844.24 9957.31 4847.12 9987.76 4849.77 10018.82 4852.58 10049.08 4855.98 10080.06 4859.67 10111.93 4863.22 10141.94 4866.55 10173.08 4868.79 10204.41 4869.91 10234.87 4870.12 10265.91 4869.36 10297.39 4867.81 10327.53 4865.97 10358.01 4864.28 10389.36 4862.67 10420.66 4860.96 10451.13 4859.09 10482.51 4857.34 10513.66 4855.85 10544.64 4854.72 10575.41 4853.96 10606.21 9766.83 9725.12 9797.91 9755.97 9829.66 9787.46 9860.70 9818.24 9891.25 9848.52 9923.19 9880.20 9953.97 9910.75 9984.75 9941.32 10015.56 9971.91 10046.45 10002.60 10077.83 10033.86 10108.36 10064.29 10139.58 10095.44 10171.69 10127.48 10201.90 10157.64 10233.23 10188.92 10264.75 10220.40 10295.37 10250.98 10326.58 10282.15 10358.26 10313.78 10388.60 10344.07 10419.26 10374.69 10450.80 10406.19 10482.27 10437.62 10512.87 10468.20 10544.36 10499.68 10575.62 10530.93 10606.72 10562.02 10637.59 10592.88 10668.50 10623.78 6517.29 6535.15 6553.28 6570.88 6588.11 6606.26 6623.93 6641.67 6659.38 6677.29 6696.03 6714.62 6733.74 6753.57 6772.32 6791.85 6811.59 6830.89 6850.55 6870.31 6889.18 6908.37 6928.14 6947.93 6967.46 6987.76 7007.93 7027.99 7047.93 7067.94 7218.23 7243.67 7269.73 7295.30 7320.53 7346.81 7372.01 7397.17 7422.38 7447.54 7472.72 7496.93 7521.61 7546.87 7570.56 7595.06 7619.63 7643.40 7667.63 7692.40 7716.16 7740.07 7764.64 7789.10 7812.67 7836.74 7860.63 7884.39 7907.95 7931.51 6.88 5984913.73 6.80 5984931.87 0.53 5984950.29 2.26 5984968.16 1.39 5984985.68 2.24 5985004.12 2.68 5985022.06 2.84 5985040.08 1.44 5985058.06 3.66 5985076.25 5.20 5985095.27 3.47 5985114.12 2.94 5985133.52 1.08 5985153.62 1.37 5985172.63 5.40 5985192.43 7.27 5985212.45 5.63 5985232.00 5.59 5985251.93 6.00 5985271.96 4.46 5985291.09 1.24 5985310.55 1.64 5985330.59 1.83 5985350.65 2.77 5985370.43 0.73 5985391.00 1.38 5985411.43 1.78 5985431.75 2.41 5985451.96 2.15 5985472.22 Last MWD+IFR+MS 12529.37 90.90 49.52 4775.50 4853.80 10615.28 10677.60 10632.87 7073.84 7938.44 2.23 5985478.19 TD (Projected) 12600.00 90.90 49.52 4774.39 4852.69 10685.68 10748.22 10703.48 7119.68 7992.16 0.00 5985524.63 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) MWD +IFR + MS - (in-field referenced MWD with mull-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 2594 FSL 3603 FEL S34 T12N R11 E UM 5978317.21 583310.85 BHL : 4569 FSL 1613 FEL S34 T12N R11 E UM 5980314.12 585274.94 590455.51 N 70 22 6.682 W 149 15 53.798 590480.74 N 70 22 6.857 W 149 15 53.054 590506.59 N 70 22 7.036 W 149 15 52.291 590531.97 N 70 22 7.208 W 149 15 51.542 590557.00 N 70 22 7.378 W 149 15 50.804 590583.08 N 70 22 7.556 W 149 15 50.035 590608.07 N 70 22 7.729 W 149 15 49.297 590633.03 N 70 22 7.904 W 149 15 48.561 590658.04 N 70 22 8.077 W 149 15 47.823 590683.00 N 70 22 8.253 W 149 15 47.086 590707.97 N 70 22 8.437 W 149 15 46~ 590731.96 N 70 22 8.620 W 149 15 45.641 590756.43 N 70 22 8.808 W 149 15 44.918 590781.46 N 70 22 9.003 W 149 15 44.179 590804.94 N 70 22 9.187 W 149 15 43.485 590829.22 N 70 22 9.379 W 149 15 42.768 590853.56 N 70 22 9.572 W 149 15 42.049 590877.12 N 70 22 9.762 W 149 15 41.353 590901.13 N 70 22 9.955 W 149 15 40.643 590925.67 N 70 22 10.149 W 149 15 39.918 590949.22 N 70 22 10.335 W 149 15 39.223 590972.91 N 70 22 10.523 W 149 15 38.523 590997.26 N 70 22 10.717 W 149 15 37.803 591021.50 N 70 22 10.912 W 149 15 37.087 591044.84 N 70 22 11.103 W 149 15 36.397 591068.69 N 70 22 11.303 W 149 15 35.692 591092.35 N 70 22 11.501 W 149 15 34.993 591115.88 N 70 22 11.698 W 149 15 591139.22 N 70 22 11.894 W 149 15 591162.55 N 70 22 12.090 W 149 15 3 . 591169.41 N 70 22 12.148 W 149 15 32.715 591222.61 N 70 22 12.599 W 149 15 31.142 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-215\L-215\L-215P62\L-215P62 Generated 9/26/2005 3:33 PM Page 5 of 5 TREE= 4-1/16" CNV WELLHEAD = FMC ACTUATOR = NA KB. ELEV = 78.3' BF. ELEV - 49.8 KOP = 400' Max Angle = 66° @ 5610' Datum MD = xxxx' Datum TV D = xxxx' SS 9-5/8" CSG, 40#, L-80, ID = 8.835" 4226' .Minimum ID = 2.813" 3-1/2" HES X NIPPLE 7" MARKER JOINT W/ RA TAG 7946' 3-1/2" TBG W/ RA MARKER~~ 8251' 7" MARKER JOINT W/ RA TAG I-I 8176' 3-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" ~~ 8511' PERFORATION SUMMARY REF LOG: Anadrill LWD 09/22/2005 ANGLE AT TOP PERF: 59° @ 7970' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4.5" 5 7970'-8005' Open 09/25/05 4.5" 5 8210'-8270' Open 09/25/05 4.5" 5 8330'-8395' Open 09/25/05 4.5" 5 8420'-8440' Open 09/25/05 4.5" 5 8625'-8710' Open 09/25/05 PBTD 8912' 7" CSG, 26#, L-80, ID = 6.276" 8gg8' L ORION UNIT WELL: L-2151 PERMIT No: 205-127 API No: 50-029-23274-00 SEC 34, T12N, R11 E, 2594' NSL & 3603' WEL BP Exploration (Alaska) AFETY NOTES: GLM'S @ STA #1- #6 ARE L -215 i wATERFLOOD MANDRFI S ICH ARE 3779' 3-1/2" HES X NIP, ID = 2.813" WATERFLOOD/GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 7740' 4202 63° MMG DCR RKP 1.5" 09/27/05 6 7941' 4297. 60° MMG-W DUM RK 1.5" 09/27/05 5 8064' 4360' 58° MMG-W DUM RK 1.5" 09/27/05 4 8171' 4416' 58° MMG-W DUM RK 1.5" 09/27/05 3 8232' 4449' 57° MMG-W DUM RK 1.5" 09/27/05 2 8339' 4507' S7° MMG-W DUM RK 1.5" 09/27/05 1 8430' 4557' 57° MMG-W DUM RK 1.5" 09/27/05 7863' ~ 3-1/2" HES X NIP, ID = 2.813" I 7$$4' I 7" X 3-1/2" BKR PREMIER PKR, ID = 2.875" 8093' ~~ 3-1/2" HES X NIP, ID = 2.813" 8114' ~ 7" X 3-1l2" BKR PREMIER PKR, ID = 2.875" I 8260' 3-1/2" HES X NIP, ID = 2.813" 82$1' 7" X 3-1/2" BKR PREMIER PKR, ID = 2.875" 8459' ~ 3-1/2" HES X NIP, ID = 2.813" I 8480' 7" X 3-1/2" BKR PREMIER PKR, ID = 2.875" 8498' --I 3-1/2" HES X NIP, ID = 2:813" 8512' 3-1/2" WLEG, ID = 3.00" • gyro ata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 September 15, 2005 Ms. Sharmaine Copeland BP Exploration (Alaska), Inc. 900 E. Benson Blvd. retrotechnicai Uata Center, LR1-'I Anchorage, Alaska 99508 Re: L-Pad, Well #L-215 Prudhoe Bay, Alaska Enclosed, please find one (1) original, two (Z) copies, and two (2) disks of the completed survey for the above referenced well. .^~~e would Iske to take this opportunity to thank you for using Gyrodata, and ~,•,re look fonivard to serving you in the future. Sincerely, ~~ ~~~~~ Rob houp North American Operations Manager RS:tf Serving the Worldwide Energy Industry with Precision Survey Instrumentation ~~ U gyro ata Gyrodata Incorporated 1682 W, Sam Houston Pkwy. N. Houston, Texas 77043 7131461-3146 Fax: 713/461-0920 SURVEY REPORT BP ~.-PAD #~-215 NABORS #9ES PRUDHOE BAY, AK AK0905G_561 SEPTEMBER 9, 2005 a ~s--~z~ ~~ ~ ~~ ~_. • Serving the Worldwide Energy Industry with Precision Survey Instrumentation r A Gyrodata Directional Surve y for BP EXPLORATION (ALASKA), INC. Lease: L-PAD Well: L-215, • Location: Nabors #9ES, Prudhoe Bay, Alaska Job Number: AK0905G 561 Run Date: 09 Sep 2005 Surveyor: Steve Thompson Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.350728 deg. N Longitude: 149.323593 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location BP Exploration (Alaska), Inc. Lease: L-PAD Well: L-215 Location: Nabors #9ES, Prudhoe Bay, Alaska Job Number: AK0905G 561 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE DEPTH BEARING SEVERITY DEPTH DIET. AZIMUTH feet deg. deg. deg. min. deg./ feet feet deg. 100 ft. O oo o oo 0 00 N O O E 0.00 0 00 0 0 O 0 ----------- ---------- -------- - ------------ - - 0 - 1000 FT. RATE GYROSCOPIC MULTISHOT --- - - -- ------ SURVEY --------- ------- ---------- ----- ---~------- -- ----- ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO NABORS #9ES R.K.B. OF 78.30 FT. AMSL 100.00 0.37 263.62 S 83 37 W 0.37 100.00 0.3 263.6 200.00 0.50 284.65 N 75 21 W 0.20 200.00 1.1 272.1 300.00 0.88 306.29 N 53 42 W 0.45 299.99 2.2 286.0 400.00 2.39 346.42 N 13 35 W 1.81 399.95 4.4 313.9 500.00 4.43 358.95 N 1 3 W 2.16 499.77 9.7 337.2 600.00 6.67 8.60 N 8 36 E 2.42 599.29 18.8 350.9 700.00 9.03 29.78 N 29 47 E 3.70 698.37 31.2 3.3 800.00 12.57 36.17 N 36 10 E 3.73 796.59 48.3 14.5 900.00 16.01 45.32 N 45 19 E 4.11 893.49 71.1 23.5 1000.00 21.77 48.93 N 48 56 E 5.87 988.07 101.6 30.9 Final Station Closure: Distance: 101.56 ft Az: 30.91 deg. HORIZONTAL COORDINATES feet 0.00 N - 0.00E 0.04 S 0.32 W 0.04 N 1.06 W 0.60 N 2.10 W 3.09 N 3.21 W 8.98 N 3.77 W 18.59 N 2.97 W 31.15 N 1.80 E 46.75 N 12.12 E 65.24 N 28.36 E 87.14 N 52.17 E • 2 BP Exploration (Alaska), Inc. Well: L-PAD L-215 Location: Nabors #9ES, Prudhoe Bay, Alaska 90 -r ~ r i i 80 70 60 50 z ~ 40 0 z 30 Outrun Gyrodata AK0905G_561 DEFINITIVE ,® Oidl-I~°fO LOC TED MD: 1000.00 E F ~ ~i i 20 ~ 10 - ~ 0 - 5 0 5 10 15 20 25 30 35 40 45 50 FASTING (ft) • • BP Exploration (Alaska'y, Inc. Well: L-PAD L-215 Location: Nabors #9ES, Prudhoe Bay, Alaska 15.0 - 12.5 • 10.0 0 0 a~ ._. 7.5 w w Outrun Gyrodata AK0905G_561 DEFINITIVE BOTT M HOLE LOCA ED MD: 000.00 w J L7 0 5.0 2.5 0.0 • 100 200 300 400 500 600 700 800 900 1000 1100 MEASURED DEPTH (ft) BP Exploration (Alaska; Inc. Well: L-PAD L-215 Location: Nabors #9ES, Prudhoe Bay, Alaska 22.5 20.0 Outrun Gyrodata AK0905G_561 DEFINITIVE BOTTOM ~OLE LOCATED nnn. 1 nnn nn 17.5 • 15.0 ~ 12.5 Q z ~, J z 10.0 7.5 5.0 2.5 0.0 100 200 300 400 500 600 700 800 900 1000 110( MEASURED DEPTH (ft) • BP Exploration (Alaska, Inc. Well: L-PAD L-215 Location: Nabors #9ES, Prudhoe Bav, Alaska R ,~ Outrun Gyrodata AK0905G 561 DEFINITIVE 40.0 20.0 0.0 • ~ 340.0 N Q 320.0 300.0 280.0 260.0 BO OM HOt LO ATED MD: 1000.00 100 200 300 400 500 600 700 800 900 :L000 110( MEASURED DEPTH (ft) • >~~., ~. -' } ~~ ~~~ ~)~ .~. ~ ~y,; Client .... ~ . '"'~ ~~~~~' BP Exploration Field..... ~.~....... "~.... Orion Well ...................... L-215i API number ................ 50-029-23274-00 Engineer .................. MARK ST. AMOUR Rig :...................... Nabors 9ES STATE :.................... Alaska SCHLUMBERGER Survey report (Alaska) Inc. ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 49.80 ft KB above permanent.......: N/A (Topdrive) DF above permanent.......: 78.30 ft ----- Vertical section origin---------------- Latitude (+N/S-).......... 0.00 ft Departure (+E/W-)......... 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)......... -999.25 ft Azimuth from Vsect Origin to target: 45.00 degrees [(c)2005 IDEAL ID10_2C_01] 22-Sep-2005 14:36:24 Page 1 of 5 Spud date ........:.......: 07-September-2005 Last survey date.........: 22-Sep-05 Total accepted surveys...: 99 MD of first survey........ 0.00 ft MD of last survey........: 9020.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............. 07-Sep-2005 Magnetic field strength..: 1151.52 HCNT Magnetic dec (+E/W-).....: 24.49 degrees Magnetic dip .............. 80.85 degrees ----- MWD survey Reference Reference G ............... Reference H ............... Reference Dip ............. Tolerance of G............ Tolerance of H............ Tolerance of Dip.......... Criteria --------- 1002.68 meal 1151.52 HCNT 80.85 degrees (+/-) 2.50 meal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.49 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.49 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction • • ~ s -~~-? SCHLUMBERGER Survey Report 22-Sep-2005 14:36:24 Page 2 of 5 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- --- (ft) -------- ------- (deg) ------ ---- (deg) ------- --- (ft) ------ (ft) ------- (ft) - -------- (ft) -------- (ft) -------- (ft) ------- (deg) -------- 100f) ----- type ----- (deg) ------ 1 - 0.00 -- 0.00 ---- 10.00 ------ 0.00 ------- 0.00 - -------- 0.00 -------- 0.00 -------- 0.00 -------- 0.00 ------- 0.00 ----- 0.00 ----- TIP ------ None 2 100.00 0.37 263.62 100.00 100.00 -0.25 -0.04 -0.32 0.32 263.62 0.37 GYD _GC_ SS None 3 200.00 0.50 284.65 100.00 200.00 -0.73 0.04 -1.06 1.06 272.08 0.20 GYD _GC_ SS None 4 300.00 0.88 306.29 100.00 299.99 -1.06 0.60 -2.11 2.19 286.00 0.45 GYD _GC_ SS None 5 400.00 2.39 346.42 100.00 399.95 -0.09 3.08 -3.21 4.45 313.83 1.81 GYD GC SS None 6 500.00 4.43 358.95 100.00 499.77 3.68 8.97 -3.77 9.74 337.19 2.16 GYD _GC_ SS None . 7 600.00 6.67 8.60 100.00 599.29 11.03 18.58 -2.98 18.82 350.90 2.42 GYD _GC_ SS None 8 700.00 9.03 29.78 100.00 698.37 23.28 31.14 1.79 31.19 3.29 3.70 GYD _GC_ SS None 9 800.00 12.57 36.17 100.00 796.59 41.62 46.74 12.11 48.28 14.53 3.73 GYD _GC_ SS None 10 900.00 16.01 45.32 100.00 893.49 66.17 65.23 28.35 71.12 23.49 4.11 GYD GC SS None 11 1000.00 21.77 48.93 100.00 988.07 98.49 87.13 52.16 101.54 30.91 5.87 GYD_ GC_ SS None 12 1040.13 24.00 48.98 40.13 1025.04 114.05 97.37 63.93 116.48 33.29 5.56 MWD IFR MS None 13 1132.84 27.54 47.31 92.71 1108.51 154.29 124.29 93.91 155.78 37.08 3.90 MWD IFR MS None 14 1226.75 31.23 46.69 93.91 1190.33 200.34 155.72 127.60 201.32 39.33 3.94 MWD IFR MS None 15 1320.65 34.86 45.84 93.90 1269.03 251.52 191.12 164.58 252.22 40.73 3.90 MWD IFR MS None 16 1413.97 39.42 45.01 93.32 1343.40 307.84 230.67 204.68 308.39 41.58 4.92 MWD IFR MS None 17 1508.15 43.89 44.17 94.18 1413.75 370.42 275.25 248.60 370.90 42.09 4.78 MWD IFR MS None 18 1604.10 49.95 45.64 95.95 1479.26 440.47 324.83 298.08 440.87 42.54 6.41 MWD IFR MS None 19 1695.33 51.49 45.75 91.23 1537.01 511.08 374.15 348.62 511.40 42.98 1.69 MWD IFR MS None 20 1790.21 50.38 45.76 94.88 1596.81 584.74 425.55 401.39 584.99 43.33 1.17 MWD IFR MS None 21 1882.97 52.44 45.81 92.76 1654.66 657.23 476.11 453.35 .657.43 43.60 2.22 MWD IFR MS None 22 1976.30 54.72 46.52 93.33 1710.07 732.31 528.12 507.53 732.45 43.86 2.52 MWD IFR MS None 23 2070.46 56.57 47.11 94.16 1763.20 810.00 581.31 564.21 810.09 44.14 2.03 MWD IFR MS None 24 2163.54 59.17 46.84 93.08 1812.70 888.77 635.09 621.82 888.82 44.40 2.80 MWD IFR MS None 25 2256.85 62.56 46.49 93.31 1858.12 970.23 691.02 681.10 970.26 44.59 3.65 MWD IFR MS None 26 2349.15 64.96 45.01 92.30 1898.93 1053.00 748.79 740.38 1053.02 44.68 2.97 MWD IFR MS None 27 2444.03 66.18 44.45 94.88 1938.17 1139.38 810.16 801.17 1139.40 44.68 1.39 MWD IFR MS None 28 2537.77 64.79 44.91 93.74 1977.07 1224.67 870.80 861.14 1224.69 44.68 1.55 MWD IFR MS None 29 2630.87 65.82 45.11 93.10 2015.96 1309.25 930.60 920.96 1309.27 44.70 1.12 MWD IFR MS None 30 2724.95 65.06 44.31 94.08 2055.07 1394.82 991.41 981.16 1394.84 44.70 1.12 MWD IFR MS None [(c)2 005 IDEAL ID10_2C_ 01] SCHLUMBERGER Survey Report 22-Sep-2005 14:36:24 Page 3 of 5 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- ------ (deg) ------ ------ (deg) ------- - (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- type ----- - .(deg) ----- --- 31 -- 2818.40 63.66 ------ 44.35 ------ 93.45 -------- 2095.50 -------- 1479.06 -------- 1051.67 -------- 1040.03 -------- 1479.08 ------- 44.68 ----- 1.50 --- MWD -- - IFR --- MS -- None 32 2911.33 63.36 46.98 92.93 2136.96 1562.22 1109.79 1099.51 1562.23 44.73 2.55 MWD IFR MS None 33 3004.77 65.10 44.38 93.44 2177.59 1646.35 1168.59 1159.70 1646.36 44.78 3.12 MWD IFR MS None 34 3098.19 64.30 44.40 93.42 2217.51 1730.80 1228.94 1218.78 1730.81 44.76 0.86 MWD IFR MS None 35 3190.86 65.43 41.11 92.67 2256.88 1814.61 1290.54 1275.71 1814.64 44.67 3.44 MWD IFR MS None 36 3284.89 63.58 41.59 94.03 2297.35 1899.31 1354.25 1331.78 1899.38 44.52 2.02 MWD_ IFR_ MS None 37 3378.06 64.43 41.15 93.17 2338.19 1982.89 1417.10 1387.13 1983.00 44.39 1.01 MWD IFR MS None 38 3471.06 65.46 41.63 93.00 2377.57 2066.97 1480.30 1442.83 2067.14 44.27 1.20 MWD IFR ^ MS None 39 3565.75 64.40 42.18 94.69 2417.70 2152.61 1544.13 1500.11 2152.83 44.17 1.24 MWD .IFR ^ MS None 40 3659.61 65.94 41.34 93.86 2457.11 2237.65 1607.67 1556.84 2237.94 44.08 1.83 MWD IFR MS None 41 3753.02 65.06 41.90 93.41 2495.85 2322.50 1671.22 1613.30 2322.86 43.99 1.09 MWD IFR MS None 42 3846.23 64.40 40.71 93.21 2535.64 2406.61 1734.53 1668.93 2407.06 43.90 1.35 MWD IFR MS None 43 3940.58 65.77 42.43 94.35 2575.39 2492.02 1798.54 1725.71 2492.56 43.82 2.20 MWD IFR MS None 44 4033.73 64.65 41.84 93.15 2614.44 2576.48 1861.25 1782.45 2577.09 43.76 1.33 MWD IFR MS None 45 4126.62 64.08 41.45 92.89 2654.63 2660.09 1923.83 1838.10 2660.78 43.69 0.72 MWD IFR MS None 46 4177.75 64.30 41.47 51.13 2676.89 2706.03 1958.33 1868.57 2706.77 43.66 0.43 MWD IFR MS None 47 4251.06 62.97 40.46 73.31 2709.45 2771.55 2007.92 1911.64 2772.38 43.59 2.19 MWD IFR MS None 48 4295.17 62.83 40.63 44.11 2729.54 2810.70 2037.76 1937.16 2811.60 43.55 0.47 MWD IFR MS None 49 4389.18 63.94 43.02 94.01 2771.66 2894.61 2100.38 1993.21 2895.60 43.50 2.56 MWD IFR MS None 50 4482.39 63.94 43.56 93.21 2812.61 2978.30 2161.33 2050.63 2979.33 43.49 0.52 MWD IFR MS None 51 4575.55 64.94 45.04 93.16 2852.81 3062.33 2221.47 2109.32 3063.36 43.52 1.79 MWD_ IFR_ MS None • 52 4668.57 64.52 44.80 93.02 2892.51 3146.45 2281.03 2168.72 3147.45 43.55 0.51 MWD IFR MS None 53 4761.94 63.27 44.76 93.37 2933.60 3230.29 2340.55 2227.78 3231.28 43.59 1.34 MWD IFR MS None 54 4854.01 65.50 45.61 92.07 2973.40 3313.31 2399.05 2286.67 3314.26 43.63 2.56 MWD IFR MS None 55 4950.17 63.10 45.73 96.16 3015.10 3399.94 2459.60 2348.65 3400.85 43.68 2.50 MWD IFR MS None 56 5047.85 60.90 47.87 97.68 3060.96 3486.14 2518.64 2411.50 3486.96 43.76 2.97 MWD IFR MS None 57 5141.64 63.15 50.31 93.79 3104.95 3568.74 2572.86 2474.10 3569.42 43.88 3.32 MWD IFR MS None 58 5235.86 63.78 50.15 94.22 3147.05 3652.68 2626.79 2538.89 3653.21 44.03 0.69 MWD IFR MS None 59 5329.38 65.07 49.29 93.52 3187.42 3736.75 2681.33 2603.24 3737.16 44.15 1.61 MWD IFR MS None 60 5423.24 64.17 47.49 93.86 3227.65 3821.40 2737.63 2666.64 3821.73 44.25 .1.98 MWD IFR MS None [(c)2 005 IDEAL ID10_2C_ 01] SCHLUMBERGER Survey Report 22-Sep-2005 14:36:24 Page 4 of 5 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5516.69 66.24 43.93 93.45 3266.85 3906.21 2796.87 2727.34 3906.51 44.28 4.11 MWD IFR MS None 62 5610.09 65.94 43.59 93.40 3304.70 3991.57 2858.54 2786.39 3991.90 44.27 0.46 MWD IFR MS None 63 5703.43 65.70 45.53 93.34 3342.94 4076.71 2919.21 2846.14 4077.04 44.27 1.91 MWD IFR MS None 64 5796.40 66.02 44.54 92.97 3380.96 4161.55 2979.16 2906.16 4161.87 44.29 1.03 MWD IFR MS None 65 5890.38 64.13 44.76 93.98 3420.57 4246.77 3039.79 2966.05 4247.09 44.30 2.02 MWD IFR MS None 66 5983.47 65.57 42.46 93.09 3460.13 4331..00 3100.80 3024.16 4331.34 44.28 2.72 MWD_ IFR _MS None . 67 6076.21 64.73 43.30 92.74 3499.11 4415.10 3162.47 3081.42 4415.47 44.26 1.22 MWD IFR MS None 68 6169.70 64.73 43.94 93.49 3539.02 4499.61 3223.67 3139.74 4500.00 44.24 0.62 MWD IFR MS None 69 6262.82 65.26 45.69 93.12 3578.38 4584.00 3283.53 3199.22 4584.39 44.25 1.80 MWD IFR MS None 70 6356.02 65.11 46.30 93.20 3617.50 4668.58 3342.30 3260.07 4668.94 44.29 0.62 MWD IFR MS None 71 6448.10 65.62 47.14 92.08 3655.88 4752.24 3399.68 3321.00 4752.57 44.33 1.00 MWD IFR MS None 72 6546.45 65.91 47.42 98.35 3696.25 4841.85 3460.52 3386.89 4842.13 44.38 0.39 MWD IFR MS None 73 6640.21 67.58 48.69 93.76 3733.27 4927.87 3518.09 3450.96 4928.10 44.45 2.17 MWD IFR MS None 74 6734.24 66.70 48.09 94.03 3769.80 5014.36 3575.63 3515.75 5014.54 44.52 1.11 MWD IFR MS None 75 6827.26 67.23 49.27 93.02 3806.20 5099.78 3632.15 3580.04 5099.92 44.59 1.30 MWD IFR MS None 76 6919.71 66.66 46.49 92.45 3842.41 5184.73 3689.19 3643.13 5184.83 44.64 2.83 MWD IFR MS None 77 7013.34 65.86 44.97 93.63 3880.10 5270.43 3749.01 3704.50 5270.52 44.66 1.71 MWD IFR MS None 78 7107.22 64.59 44.00 93.88 3919.44 5355.66 3809.82 3764.23 5355.76 44.66 1.65 MWD IFR MS None 79 7201.50 63.45 43.31 94.28 3960.74 5440.39 3871.13 3822.73 5440.49 44.64 1.38 MWD IFR MS None 80 7293.77 63.43 43.24 92.27 4002.00 5522.88 3931.22 3879.31 5523.00 44.62 0.07 MWD IFR MS None 81 7386.98 63.38 43.06 93.21 4043.73 5606.19 3992.03 3936.31 5606.32 44.60 0.18 MWD IFR MS None 82 7480.69 63.43 43.32 93.71 4085.68 5689.94 4053.12 3993.66 5690.09 44.58 0.25 MWD IFR MS None 83 7574.75 63.61 43.91 94.06 4127.62 5774.11 4114.08 4051.74 5774.27 44.56 0.59 MWD IFR MS None 84 7668.08 63.33 43.08 93.33 4169.31 5857.58 4174.65 4109.21 5857.76 44.55 0.85 MWD IFR MS None 85 7761.44 63.43 43.20 93.36 4211.14 5941.00 4235.55 4166.29 5941.20 44.53 0.16 MWD IFR MS None 86 7855.00 61.56 43.59 93.56 4254.35 6023.95 4295.85 4223.29 6024.16 44.51 2.03 MWD IFR MS None 87 7947.70 59.65 41.45 92.70 4299.85 6104.63 4355.36 4277.88 6104.87 44.49 2.88 MWD IFR MS None 88 8041.45 58.47 38.65 93.75 4348.06 6184.72 4416.90 4329.62 6185.03 44.43 2.85 MWD IFR MS None 89 8134.52 58.29 37.50 93.07 4396.85 6263.40 4479.28 4378.50 6263.80 44.35 1.07 MWD IFR MS None 90 8227.82 56.74 37.39 93.30 4446.96 6341.41 4541.77 4426.35 6341.94 44.26 1.66 MWD IFR MS None [(c)2 005 IDEAL ID10_2C_ 01] SCHLUMBERGER Survey Report 22 -Sep-2005 14:36:24 Page 5 of 5 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (de g) 91 8322.23 57.31 37.64 94.41 4498.34 6419.94 4604.59 4474.58 6420.60 44.18 0.64 MWD IFR MS None 92 8415.99 57.28 37.50 93.76 4549.00 6498.17 4667.12 4522.68 6498..97 44.10 0.13 MWD IFR MS None 93 8508.50 55.94 36.55 92.51 4599.92 6574.66 4728.78 4569.20 6575.63 44.02 1.68 MWD IFR MS None 94 8602.10 56.39 36.08 93.60 4652.03 6651.52 4791.43 4615.24 6652.69 43.93 0.64 MWD IFR MS None 95 8696.21 57.08 36.16 94.11 4703.65 6729.26 4854.99 4661.63 6730.65 43.84 0.74 MWD IFR MS None 96 8789.37 57.96 35.21 93.16 4753.68 6806.81 4918.82 4707.46 6808.45 43.74 1.28 MWD_IFR _MS None 97 8882.83 58.36 36.12 93.46 4802.99 6885.16 4983.33 4753.76 6887.07 43.65 0.93 MWD IFR MS None 98 8959.46 59.06 35.99 76.63 4842.78 6949.84 5036.27 4792.30 6951.99 43.58 0.92 MWD IFR MS None 99 9020.00 59.06 35.99 60.54 4873.91 7001.13 5078.28 4822.81 7003.46 43.52 0.00 Projection to TD [(c)2005 IDEAL ID10_2C_01] • T ~; (, r .~1~3S~s? ~f~', SCHLUMBERGER fit.. - '~~4ti~~ Survey report Client ...................: BP Exploration (Alaska) Inc. Field ..................... Orion Well ...................... L-215PB1 API number ...............: 50-029-23274-70 Engineer .................: MARK ST. AMOUR Rig :...................... Nabors 9ES State :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: -------------- Mean Sea Level Drill Floor 49.80 ft N/A Top Drive 78.30 ft ----- Vertical section origin---------------- Latitude (+N/S-).......... 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 45.00 degrees [(c)2005 IDEAL ID10_2C_01] 10-Sep-2005 23:19:00 Page 1 of 3 Spud date ................. 07-September-2005 Last survey date.........: 09-Sep-05 Total accepted surveys...: 47 MD of first survey.......: 0.00 ft MD of last survey........: 4218.92 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............. 07-Sep-2005 Magnetic field strength..: 1151.52 HCNT Magnetic dec (+E/W-).....: 24.49 degrees Magnetic dip .............: 80.85 degrees ----- MWD survey Reference Reference G ............... Reference H ............... Reference Dip ............: Tolerance of G...........: Tolerance of H............ Tolerance of Dip.........: Criteria --------- 1002.68 meal 1151.52 HCNT 80.85 degrees (+/-) 2.50 meal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.49 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.49 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction • • SCHLUMBERGER Survey Report 10 -Sep-2005 22:05:07 Page 2 of 3 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 100.00 0.37 263.62 100.00 100.00 -0.25 -0.04 -0.32 0.32 263.62 0.37 GYD_GC_ SS 3 200.00 0.50 284.65 100.00 200.00 -0.73 0.04 -1.06 1.06 272.08 0.20 GYD_GC_ SS 4 300.00 0.88 306.29 100.00 299.99 -1.06 0.60 -2.11 2.19 286.00 0.45 GYD_GC_ SS 5 400.00 2.39 346.42 100.00 399.95 -0.09 3.08 -3.21 4.45 313.83 1.81 GYD_GC_ SS 6 500.00 4.43 358.95 100.00 499.77 3.68 8.97 -3.77 9.74 337.19 2.16 GYD_GC_SS i 7 600.00 6.67 8.60 100.00 599.29 11.03 18.58 -2.98 18.82 350.90 2.42 GYD_ GC_ SS 8 700.00 9.03 29.78 100.00 698.37 23.28 31.14 1.79 31.19 3.29 3.70 GYD_ GC_ SS 9 800.00 12.57 36.17 100.00 796.59 41.62 46.74 12.11 48.28 14.53 3.73 GYD_ GC_ SS 10 900.00 16.01 45.32 100.00 893.49 66.17 65.23 28.35 71.12 23.49 4.11 GYD_ GC_ SS 11 1000.00 21.77 48.93 100.00 988.07 98.49 87.13 52.16 101.54 30.91 5.87 GYD_ GC_ SS 12 1040.13 24.00 48.98 40.13 1025.04 114.05 97.37 63.93 116.48 33.29 5.56 MWD_ IFR _MS 13 1132.84 27.54 47.31 92.71 1108.51 154.29 124.29 93.91 155.78 37.08 3.90 MWD_ IFR _MS 14 1226.75 31.23 46.69 93.91 1190.33 200.34 155.72 127.60 201.32 39.33 3.94 MWD_ IFR _MS 15 1320.65 34.86 45.84 93.90 1269.03 251.52 191.12 164.58 252.22 40.73 3.90 MWD_ IFR _MS 16 1413.97 39.42 45.01 93.32 1343.40 307.84 230.67 204.68 308.39 41.58 4.92 MWD_ IFR _MS 17 1508.15 43.89 44.17 94.18 1413.75 370.42 275.25 248.60 370.90 42.09 4.78 MWD_ IFR _MS 18 1604.10 49.95 45.64 95.95 1479.26 440.47 324.83 298.08 440.87 42.54 6.41 MWD_ IFR _MS 19 1695.33 51.49 45.75 91.23 1537.01 511.08 374.15 348.62 511.40 42.98 1.69 MWD_ IFR _MS 20 1790.21 50.38 45.76 94.88 1596.81 584.74 425.55 401.39 584.99 43.33 1.17 MWD_ IFR _MS 21 1882.97 52.44 45.81 92.76 1654.66 657.23 476.11 453.35 657.43 43.60 2.22 MWD_ IFR _MS~ 22 1976.30 54.72 46.52 93.33 1710.07 732.31 528.12 507.53 732.45 43.86 2.52 MWD_ IFR _MS 23 2070.46 56.57 47.11 94.16 1763.20 810.00 581.31 564.21 810.09 44.14 2.03 MWD_ IFR _MS 24 2163.77 60.09 46.60 93.31 1812.18 889.36 635.61 622.14 889.41 44.39 3.80 MWD_ IFR _MS 25 2257.60 65.44 44.90 93.83 1855.11 972.75 693.82 681.85 972.79 44.50 5.92 MWD_ IFR _MS 26 2347.81 64.50 44.92 90.21 1893.28 1054.49 751.71 739.56 1054.52 44.53 1.04 MWD_ IFR _MS 27 2440.30 65.46 45.87 92.49 1932.40 1138.29 810.56 799.23 1138.32 44.60 1.39 MWD_ IFR _MS 28 2536.80 64.81 45.43 96.50 1972.97 1225.84 871.77 861.83 1225.86 44.67 0.79 MWD_ IFR _MS 29 2630.54 65.73 46.67 93.74 2012.19 1310.97 930.85 923.13 1310.98 44.76 1.55 MWD_ IFR _MS 30 2724.64 65.10 46.53 94.10 2051.34 1396.50 989.65 985.31 1396.50 44.87 0.68 MWD_ IFR _MS [(c)2005 IDEAL ID10_2C_ 01] SCHLUMBERGER Survey Report 10 -Sep-2005 22:05:07 Page 3 of 3 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2818.56 64.77 46.04 93.92 2091.13 1481.55 1048.44 1046.80 1481.56 44.96 0.59 MWD_ IFR _MS 32 2911.80 63.42 45.70 93.24 2131.86 1565.41 1106.83 1107.00 1565.41 45.00 1.48 MWD_ IFR _MS 33 3005.33 65.78 45.73 93.53 2171.98 1649.89 1165.82 1167.48 1649.89 45.04 2.52 MWD_ IFR _MS 34 3099.13 64.78 45.69 93.80 2211.20 1735.09 1225.32 1228.47 1735.09 45.07 1.07 MWD_ IFR _MS 35 3191.99 66.71 45.69 92.86 2249.35 1819.74 1284.46 1289.04 1819.74 45.10 2.08 MWD_ IFR _MS 36 3286.32 65.00 45.76 94.33 2287.93 1905.81 1344.55 1350.67 1905.81 45.13 1.81 MWD_ IFR _MS 37 3379.17 64.15 45.55 92.85 2327.79 1989.66 1403.16 1410.64 1989.67 45.15 0.94 MWD_ IFR _MS 38 3471.61 65.41 45.58 92.44 2367.18 2073.28 1461.71 1470.36 2073.29 45.17 1.36 MWD_ IFR _MS 39 3566.57 64.04 45.01 94.96 2407.72 2159.15 1522.11 1531.39 2159.16 45.17 1.54 MWD_ IFR _MS 40 3660.28 63.55 45.26 93.71 2449.11 2243.22 1581.42 1590.98 2243.23 45.17 0.58 MWD_ IFR _MS 41 3753.40 65.21 45.14 93.12 2489.37 2327.19 1640.58 1650.55 2327.20 45.17 1.79 MWD_ IFR _MS 42 3846.48 64.60 45.06 93.08 2528.85 2411.48 1700.08 1710.26 2411.49 45.17 0.66 MWD_ IFR _MS 43 3940.44 63.69 44.73 93.96 2569.82 2496.03 1759.98 1769.94 2496.04 45.16 1.02 MWD_ IFR _MS 44 4033.05 64.19 45.04 92.61 2610.51 2579.23 1818.92 1828.65 2579.24 45.15 0.62 MWD_ IFR _MS 45 4127.44 63.45 45.00 94.39 2652.15 2663.93 1878.80 1888.57 2663.94 45.15 0.78 MWD_ IFR _MS 46 4218.92 65.57 45.61 91.48 2691.52 2746.50 1936.87 1947.27 2746.51 45.15 2.39 MWD_IFR_MS 47 4279.00 65.57 45.61 60.08 2716.36 2801.20 1975.14 1986.36 2801.21 45.16 0..00 Projection to TD [(c)2005 IDEAL ID10_2C_01] SCHLUMBERGER Survey report Client .................... BP Exploration (Alaska) Inc. Field ..................... Orion Well ...................... L-215PB2 API number ...............: 50-029-23274-71 Engineer .................. F. Medina Rig :...................... Nabors 9ES STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS............ Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 49.80 ft KB above permanent.......: 0.00 ft DF above permanent.......: 78.30 ft ----- Vertical section origin---------------- Latitude (+N/S-).......... 0.00 ft Departure.(+E/W-)......... 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).......... -999.25 ft Departure (+E/W-)......... -999.25 ft Azimuth from Vsect Origin to target: 45.00 degrees [(c)2005 IDEAL ID10_2C_01] 17-Sep-2005 20:45:57 ~~~ ~~-~, ,.. w-.r Page 1 0~~8~- ~~a~~;~ ~t~ ~ ~`ai~ G`~9€ Spud date ................. Last survey date.......... Total accepted surveys...: MD of first survey........ MD of last survey......... ----- Geomagnetic data ---------------------- Magnetic model............ BGGM version 2005 Magnetic date ............. 07-Sep-2005 Magnetic field strength..: 1151.52 HCNT Magnetic dec (+E/W-).....: 24.49 degrees Magnetic dip........ .... 80.85 degrees 07-September-2005 17-Sep-05 182 0.00 ft 12600.00 ft ----- MWD survey Reference Reference G ............... Reference H ............... Reference Dip ............. Tolerance of G............ Tolerance of H............ Tolerance of Dip.......... Criteria --------- 1002.68 meal 1151.52 HCNT 80.85 degrees (+/-) 2.50 meal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.49 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.49 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 17-Sep-2005 20:45:57 Page 2 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) • • 20~ -~~7 1 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 100.00 0.37 263.62 100.00 100.00 -0.25 -0.04 -0.32 0.32 263.62 0.37 GYD _GC_ SS None 3 200.00 0.50 284.65 100.00 200.00 -0.73 0.04 -1.06 1.06 272.08 0.20 GYD _GC_ SS None 4 300.00 0.88 306.29 100.00 299.99 -1.06 0.60 -2.11 2.19 286.00 0.45 GYD _GC_ SS None 5 400.00 2.39 346.42 100.00 399.95 -0.09 3.08 -3.21 4.45 313.83 1.81 GYD _GC_ SS None 6 500.00 4.43 358.95 100.00 499.77 3.68 8.97 -3.77 9.74 337.19 2.16 GYD _GC_ SS None 7 600.00 6.67 8.60 100.00 599.29 11.03 18.58 -2.98 18.82 350.90 2.42 GYD _GC_ SS None 8 700.00 9.03 29.78 100.00 698.37 23.28 31.14 1.79 31.19 3.29 3.70 GYD _GC_ SS None 9 800.00 12.57 36.17 100.00 796.59 41.62 46.74 12.11 48.28 14.53 3.73 GYD _GC_ SS None 10 900.00 16.01 45.32 100.00 893.49 66.17 65.23 28.35 71.12 23.49 4.11 GYD GC SS None 11 1000.00 21.77 48.93 100.00 988.07 98.49 87.13 52.16 101.54 30.91 5.87 GYD GC SS None 12 1040.13 24.00 48.98 40.13 1025.04 114.05 97.37 63.93 116.48 33.29 5.56 MWD _ _ _IFR MS • 13 1132.84 27.54 47.31 92.71 1108.51 154.29 124.29 93.91 155.78 37.08 3.90 MWD l IFR _MS 14 1226.75 31.23 46.69 93.91 1190.33 200.34 155.72 127.60 201.32 39.33 3.94 MWD ~ IFR MS 15 1320.65 34.86 45.84 93.90 1269.03 251.52 191.12 164.58 252.22 40.73 3.90 MWD IFR MS 16 1413.97 39.42 45.01 93.32 1343.40 307.84 230.67 204.68 308.39 41.58 4.92 MWD IFR MS 17 1508.15 43.89 44.17 94.18 1413.75 370.42 275.25 248.60 370.90 42.09 4.78 MWD IFR MS 18 1604.10 49.95 45.64 95.95 1479.26 440.47 324.83 298.08 440.87 42.54 6.41 MWD IFR MS 19 1695.33 51.49 45.75 91.23 1537.01 511.08 374.15 348.62 511.40 42.98 1.69 MWD IFR MS 20 1790.21 50.38 45.76 94.88 1596.81 584.74 425.55 401.39 584.99 43.33 1.17 MWD IFR MS 21 1882.97 52.44 45.81 92.76 1654.66 657.23 476.11 453.35 657.43 43.60 2.22 MWD IFR MS 22 1976.30 54.72 46.52 93.33 1710.07 732.31 528.12 507.53 732.45 43.86 2.52 MWD IFR MS 23 2070.46 56.57 47.11 94.16 1763.20 810.00 581.31 564.21 810.09 44.14 2.03 MWD IFR MS 24 2163.54 59.17 46.84 93.08 1812.70 888.77 635.09 621.82 888.82 44.40 2.80 MWD IFR MS 25 2256.85 62.56 46.49 93.31 1858.12 970.23 691.02 681.10 970.26 44.59 3.65 MWD IFR MS 26 2349.15 64.96 45.01 92.30 1898.93 1053.00 748.79 740.38 1053.02 44.68 2.97 MWD_ IFR _MS 27 2444.03 66.18 44.45 94.88 1938.17 1139.38 810.16 801.17 1139.40 44.68 1.39 MWD_ IFR _MS 28 2537.77 64.79 44.91 93.74 1977.07 1224.67 870.80 861.14 1224.69 44.68 1.55 MWD IFR MS 29 2630.87 65.82 45.11 93.10 2015.96 1309.25 930.60 920.96 1309.27 44.70 1.12 MWD IFR MS 30 2724.95 65.06 44.31 94.08 2055.07 1394.82 991.41 981.16 1394.84 44.70 1.12 MWD IFR MS [(c)2 005 IDEAL ID10_2C_ 01] SCHLUMBERGER Survey Report 17-Sep-2005 20:45:57 Page 3 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (de g) 31 2818.40 63.66 44.35 93.45 2095.50 1479.06 1051.67 1040.03 1479.08 44.68 1.50 MWD IFR MS 32 2911.33 63.36 46.98 92.93 2136.96 1562.22 1109.79 1099.51 1562.23 44.73 2.55 MWD IFR MS 33 3004.77 65.10 44.38 93.44 2177.59 1646.35 1168.59 1159.70 1646.36 44.78 3.12 MWD IFR MS 34 3098.19 64.30 44.40 93.42 2217.51 1730.80 1228.94 1218.78 1730.81 44.76 0.86 MWD IFR MS 35 3190.86 65.43 41.11 92.67 2256.88 1814.61 1290.54 1275.71 1814.64 44.67 3.44 MWD_IFR_MS 36 3284.89- 63.58 41.59 37 3378.06 64.43 41.15 38 3471.06 65.46 41.63 39 3565.75 64.40 42.18 40 3659.61 65.94 41.34 41 3753.02 65.06 41.90 42 3846.23 64.40 40.71 43 3940.58 65.77 42.43 44 4033.73 64.65 41.84 45 4126.62 64.08 41.45 46 4177.75 64.30 41.47 47 42.51.06 62.97 40.46 48 4295.17 62.83 40.63 49 4389.18 63.94 43.02 50 4482.39 63.94 43.56 51 4575.55 64.94 45.04 52 4668.57 64.52 44.80 53 4761.94 63.27 44.76 54 4854.01 65.50 45.61 55 4950.17 63.10 45.73 56 5047.85 60.90 47.87 57 5141.64 63.15 50.31 58 5235.86 63.78 50.15 59 5329.38 65.07 49.29 60 5423.24 64.17 47.49 [(c)2005 IDEAL ID10_2C_01] SCHLUMBERGER Survey Report Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) --- -------- ------ ------- 61 5516.69 66.24 43.93 62 5610.09 65.94 43.59 63 5703.43 65.70 45.53 64 5796.40 66.02 44.54 65 5890.38 64.13 44.76 94.03 93.17 93.00 94.69 93.86 93.41 93.21 94.35 93.15 92.89 51.13 73.31 44.11 94.01 93.21 93.16 93.02 93.37 92.07 96.16 97.68 93.79 94.22 93.52 93.86 Course length (ft) 93.45 93.40 93.34 92.97 93.98 2297.35 2338.19 2377.57 2417.70 2457.11 2495.85 2535.64 2575.39 2614.44 2654.63 2676.89 2709.45 2729.54 2771.66 2812.61 2852.81 2892.51 2933.60 2973.40 3015.10 3060.96 3104.95 3147.05 3187.42 3227.65 TVD depth (ft) 3266.85 3304.70 3342.94 3380.96 3420.57 1899.31 1354.25 1982.89 1417.10 2066.97 1480.30 2152.61 1544.13 2237.65 1607.67 2322.50 1671.22 2406.61 1734.53 2492.02 1798.54 2576.48 1861.25 2660.09 1923.83 2706.03 1958.33 2771.55 2007.92 2810.70 2037.76 2894.61 2100.38 2978.30 2161.33 3062.33 2221.47 3146.45 2281.03 3230.29 2340.55 3313.31 2399.05 3399.94 2459.60 3486.14 2518.64 3568.74 2572.86 3652.68 2626.79 3736.75 2681.33 3821.40 2737.63 17-Sep-2005 20:45:57 Vertical Displ section +N/S- (ft) (ft) 3906.21 2796.87 3991.57 2858.54 4076.71 2919.21 4161.55 2979.16 4246.77 3039.79 1331.78 1387.13 1442.83 1500.11 1556.84 1613.30 1668.93 1725.71 1782.45 1838.10 1868.57 1911.64 1937.16 1993.21 2050.63 2109.32 2168.72 2227.78 2286.67 2348.65 2411.50 2474.10 2538.89 2603.24 2666.64 Displ +E/W- (ft) 2727.34 2786.39 2846.14 2906.16 2966.05 1899.38 1983.00 2067.14 2152.83 2237.94 2322.86 2407.06 2492.56 2577.09 2660.78 2706.77 2772.38 2811.60 2895.60 2979 .33 3063.36 3147.45 3231.28 3314.26 3400.85 3486.96 3569.42 3653.21 3737.16 3821.73 Page Total displ (ft) 3906.51 3991.90 4077.04 4161.87 4247.09 44.52 2.02 44.39 1.01 44.27 1.20 44.17 1.24 44.08 1.83 43.99 1.09 43.90 1.35 43.82 2.20 43.76 1.33 43.69 0.72 43.66 0.43 43.59 2.19 43.55 0.47 43.50 2.56 43.49 0.52 43.52 1.79 43.55 0.51 43.59 1.34 43.63 2.56 43.68 2.50 43.76 2.97 43.88 3.32 44.03 0.69 44.15 1.61 44.25 1.98 4 of 8 At DLS Azim (deg/ (deg) 100f) 44.28 4.11 44.27 0.46 44.27 1.91 44.29 1.03 44.30 2.02 MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS • MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS i Srvy Tool tool Corr type (deg) MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS 66 5983.47 65.57 42.46 93.09 3460.13 4331.00 3100.80 3024.16 4331.34 44.28 2.72 MWD IFR MS 67 6076.21 64.73 43.30 92.74 3499.11 4415.10 3162.47 3081.42 4415.47 44.26 1.22 MWD IFR MS 68 6169.70 64.73 43.94 93.49 3539.02 4499.61 3223.67 3139.74 4500.00 44.24 0.62 MWD IFR MS 69 6262.82 65.26 45.69 93.12 3578.38 4584.00 3283.53 3199.22 4584.39 44.25 1.80 MWD IFR MS 70 6356.02 65.11 46.30 93.20 3617.50 4668.58 3342.30 3260.07 4668.94 44.29 0.62 MWD IFR MS 71 6448.10 65.62 47.14 92.08 3655.88 4752.24 3399.68 3321.00 4752.57 44.33 1.00 MWD IFR MS 72 6541.42 65.60 47.70 93.32 3694.41 4837.16 3457.19 3383.59 4837.44 44.38 0.55 MWD IFR MS 73 6634.75 70.78 51.05 93.33 3729.09 4923.51 3513.54 3449.35 4923.71 44.47 6.47 MWD IFR MS 74 6728.50 74.11 53.25 93.75 3757.36 5012.17 3568.36 3519.92 5012.29 44.61 4.20 MWD IFR MS 75 6821.58 73.80 55.12 93.08 3783.09 5100.48 3620.71 3592.46 5100.52 44.78 1.96 MWD IFR MS 76 6915.49 73.91 55.67 93.91 3809.20 5189.20 3671.94 3666.70 5189.20 44.96 0.57 MWD IFR MS 77 7007.80 73.54 55.53 92.31 3835.07 5276.30 3722.00 3739.82 5276.31 45.14 0.43 MWD IFR MS 78 7101.61 73.22 54.69 93.81 3861.91 5364.79 3773.41 3813.55 5364.87 45.30 0.92 MWD IFR MS 79 7195.31 72.76 55.16 93.70 3889.32 5453.05 3824.90 3886.88 5453.23 45.46 0.69 MWD IFR MS 80 7289.04 71.40 54.39 93.73 3918.16 5540.94 3876.34 3959.73 5541.25 45.61 1.65 MWD IFR MS • 81 7382.85 72.45 55.75 93.81 3947.26 5628.74 3927.40 4032.84 5629.23 45.76 1.78 MWD IFR MS 82 7476.26 72.00 56.56 93.41 3975.78 5716.01 3976.94 4106.72 5716.75 45.92 0.96 MWD IFR MS 83 7570.44 74.69 54.39 94.18 4002.77 5804.72 4028.08 4181.04 5805.73 46.07 3.61 MWD IFR MS 84 7664.10 73.86 53.78 93.66 4028.16 5893.75 4080.96 4254.05 5895.02 46.19 1.09 MWD IFR MS 85 7757.69 73.57 52.25 93.59 4054.40 5982.70 4135.00 4325.81 5984.22 46.29 1.60 MWD IFR MS 86 7851.43 75.89 49.87 93.74 4079.09 6072.61 4191.84 4396.13 6074.33 46.36 3.48 MWD IFR MS 87 7944.24 74.17 48.96 92.81 4103.07 6162.00 4250.16 4464.22 6163.86 46.41 2.08 MWD IFR MS 88 8037.41 72.30 47.36 93.17 4129.94 6251.07 4309.66 4530.68 6253.02 46.43 2.59 MWD IFR MS 89 8131.01 73.15 46.59 93.60 4157.74 6340.39 4370.65 4596.02 6342.39 46.44 1.20 MWD IFR MS 90 8224.12 71.88 47.89 93.11 4185.71 6429.13 4430.94 4661.22 6431.19 46.45 1.91 MWD IFR MS ((c)2 005 IDEAL ID10_2C_ 01] SCHLUMBERGER Survey Report 17-Sep-2005 20:45:57 Page 5 of 8 Seq. Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) {deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8317.49 74.39 48.12 93.37 4212.80 6518.35 4490.72 4727.62 6520.50 46.47 2.70 MWD IFR MS 92 8410.72 73.96 48.17 93.23 4238.22 6607.91 4550.57 4794.43 6610.16 46.49 0.46 MWD IFR MS 93 8504.29 72.90 48.54 93.57 4264.91 6697.44 4610.16 4861.45 6699.80 46.52 1.19 MWD IFR MS 94 8598.01 72.80 48.98 93.72 4292.54 6786.80 4669.20 4928.79 6789.28 46.55 0.46 MWD IFR MS 95 8690.12 74.02 46.59 92.11 4318.84 6874.96 4728.51 4994.16 6877.53 46.57 2.82 MWD IFR MS 96 8783.60 73.07 46.01 93.48 4345.32 6964.59 4790.45 5058.97 6967.18 46.56 1.18 MWD IFR MS 97 8877.37 72.38 45.87 93.77 4373.17 7054.12 4852.71 5123.32 7056.71 46.55 0.75 MWD IFR MS 98 8970.78 72.84 45.14 93.41 4401.09 7143.25 4915.19 5186.90 7145.84 46.54 0.89 MWD IFR MS 99 9063.77 73.55 45.29 92.99 4427.97 7232.27 4977.90 5250.08 7234.83 46.52 0.78 MWD IFR MS 100 9158.00 72.98 45.32 94.23 4455.10 7322.51 5041.36 5314.23 7325.05 46.51 0.61 MWD IFR MS 101 9251.18 73.15 46.46 93.18 4482.25 7411.64 5103.41 5378.23 7414.18 46.50 1.18 MWD IFR MS 102 9344.46 72.31 46.41 93.28 4509.94 7500.68 5164.79 5442.77 7503.26 46.50 0.90 MWD IFR MS 103 9437.67 71.42 47.48 93.21 4538.95 7589.21 5225.27 5507.49 7591.83 46.51 1.45. MWD IFR MS 104 9531.17 70.87 50.76 93.50 4569.18 7677.45 5283.17 5574.38 7680.21 46.54 3.37 MWD IFR MS 105 9624.22 72.50 52.99 93.05 4598.42 7765.14 5337.69 5643.87 7768.16 46.60 2.87 MWD IFR MS 106 9716.44 72.45 53.10 92.22 4626.19 7852.21 5390.56 5714.14 7855.55 46.67 0.13 MWD IFR MS 107 9810.26 72.77 52.97 93.82 4654.23 7940.87 5444.40 5785.68 7944.53 46.74 0.37 MWD IFR MS 108 9903.65 72.06 53.17 93.39 4682.44 8029.01 5497.89 5856.84 8033.02 46.81 0.79 MWD IFR MS 109 9997.70 75.49 53.92 94.05 4708.72 8118.30 5551.54 5929.47 8122.69 46.89 3.73 MWD IFR MS 110 10091.43 78.14 52.19 93.73 4730.10 8208.64 5606.39 6002.39 8213.42 46.95 3.35 MWD IFR MS 111 10183.06 81.57 52.72 91.63 4746.23 8298.06 5661.34 6073.90 8303.19 47.01 3.79 MWD IFR MS 112 10276.83 82.35 52.16 93.77 4759.35 8390.13 5717.94 6147.50 8395.63 47.07 1.02 MWD IFR MS 113 10370.16 84.82 53.17 93.33 4769.78 8482.04 5774.18 6221.23 8487.93 47.13 2.86 MWD IFR MS 114 10464.28 89.49 51.73 94.12 4774.45 8575.22 5831.46 6295.74 8581.50 47.19 5.19 MWD IFR MS 115 10498.60 90.37 51.34 34.32 4774.49 8609.32 5852.80 6322.61 8615.72 47.21 2.80 MWD _IFR _MS 116 10529.59 89.92 51.41 30.99 4774.41 8640.12 5872.15 6346.82 8646.63 47.22 1.47 MWD IFR MS 117 10557.77 89.63 51.33 28.18 4774.52 8668.12 5889.74 6368.83 8674.74 47.24 1.07 MWD IFR MS 118 10588.86 88.63 51.24 31.09 4774.99 8699.02 5909.19 6393.09 8705.75 47.25 3.23 MWD IFR MS 119 10620.16 87.25 49.62 31.30 4776.12 8730.16 5929.11 6417.20 8736.98 47.26 6.80 MWD IFR MS 120 10651.29 86.19 48.98 31.13 4777.90 8761.15 5949.38 6440.76 8768.04 47.27 3.98 MWD IFR MS [(c)2 005 IDEAL ID10_2C_ 01] SCHLUMBERGER Survey Report 17-Sep-2005 20:45:57 Page 6 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 10681.53 85.24 48.49 30.24 4780.16 8791.24 5969.26 - 6463.43 -------- 8798.18 ------- 47.28 ----- 3.53 --- MWD_ -- - IFR_ ----- MS 122 10713.53 84.18 48.91 32.00 4783.11 8823.04 5990.29 6487.37 8830.04 47.28 3.56 MWD IFR MS 123 10744.67 84.96 50.71 31.14 4786.06 8853.93 6010.30 6511.05 8861.00 47.29 6.28 MWD IFR MS 124 10778.29 86.44 52.13 33.62 4788.58 8887.24 6031.20 6537.25 8894.44 47.31 6.09 MWD_ IFR_ MS 125 10809.10 86.11 52.61 30.81 4790.58 8917.73 6049.97 6561.60 8925.07 47.32 1.89 MWD_ IFR_ MS 126 10838.16 87.22 53.07 29.06 4792.27 8946.47 6067.50 6584.72 8953.94 47.34 4.13 MWD IFR MS 127 10869.59 87.50 53.24 31.43 4793.72 8977.55 6086.33 6609.85 8985.18 47.36 1.04 MWD IFR MS 128 10901.32 86.82 52.96 31.73 4795.29 9008.92 6105.35 6635.19 9016.71 47.38 2.32 MWD IFR MS 129 10931.50 86.07 53.08 30.18 4797.16 9038.75 6123.47 6659.25 9046.69 47.40 2.52 MWD IFR MS 130 10962.67 87.07 53.46 31.17 4799.02 9069.54 6142.08 6684.19 9077.64 47.42 3.43 MWD IFR MS 131 10994.20 87.05 53.50 31.53 4800.64 9100.69 6160.82 6709.50 9108.95 47.44 0.14 MWD IFR MS 132 11025.03 86.51 54.45 30.83 4802.37 9131.09 6178.92 6734.39 9139.53 47.46 3.54 MWD IFR MS 133 11056.44 87.90 55.62 31.41 4803.91 9161.98 6196.90 6760.10 9170.63 47.49 5.78 MWD IFR MS 134 11087.44 89.22 55.18 31.00 4804.68 9192.46 6214.50 6785.61 9201.33 47.52 4.49 MWD IFR MS 135 11117.80 88.87 54.74 30.36 4805.19 9222.36 6231.93 6810.46 9231.43 47.54 1.85 MWD IFR MS 136 11150.00 88.19 54.59 32.20 4806.02 9254.09 6250.54 6836.72 9263.37 47.56 2.16 MWD IFR MS 137 11181.36 87.70 54.43 138 11212.26 87.21 54.53 139 11242.19 86.96 54.80 140 11274.67 88.56 55.03 141 11305.37 90.33 55.59 142 11336.36 90.64 55.71 143 11367.17 89.93 55.30 144 11398.31 88.87 54.97 145 11429.67 87.19 55.48 146 11461.09 86.56 55.31 147 11491.76 85.33 54.63 148 11522.71 84.64 55.19 149 11554.33 83.75 54.48 150 11585.60 83.67 55.46 [(c)2005 IDEAL ID10_2C_01] SCHLUMBERGER Survey Report --- -------- ------ ------- Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) --- -------- ------ ------- 151 11616.40 85.67 54.76 152 11647.53 87.76 55.09 153 11679.30 87.81 55.25 154 11710.37 87.28 55.?1 155 11740.96 86.87 55.60 156 11772.96 86.31 55.15 157 11803.81 85.58 54.76 158 11834.71 84.71 54.88 159 11865.66 84.27 54.96 160 11896.68 85.07 54.15 161 11928.18 85.27 52.52 162 11958.83 84.21 52.44 163 11990.24 83.38 52.03 164 12022.56 83.50 51.70 165 12052.98 83.10 51.58 166 12084.49 84.78 51.31 167 12116.09 87.07 51.11 168 12146.73 88.76 50.77 169 12177.94 90.47 51.11 170 12209.63 92.27 51.72 31.36 30.90 29.93 32.48 30.70 30.99 30.81 31.14 31.36 31.42 30.67 3.0.95 31.62 31.27 Course length (ft) 30.80 31.13 31.77 31.07 30.59 32.00 30.85 30.90 30.95 31.02 31.50 30.65 31.41 32.32 30.42 31.51 31.60 30.64 31.21 31.69 4807.14 4808.51 4810.04 4811.30 4811.60 4811.34 4811.19 4811.51 4812.59 4814.30 4816.47 4819.18 4822.38 4825.80 TVD depth (ft) 4828.66 4830.45 4831.67 4833.01 4834.57 4836.47 4838.65 4841.27 4844.24 4847.12 4849.77 4852.58 4855.98 4859.67 4863.22 4866.55 4868.79 4869.91 4870.12 4869.36 9285.00 6268.74 9315.45 6286.67 9344.92 6303.96 9376.88 6322.61 9407.09 6340.08 9437.54 6357.57 9467.83 6375.02 9498.49 6392.82 9529.33 6410.69 9560.19 6428.51 9590.32 6446.07 9620.69 6463.79 9651.68 6481.91 9682.30 6499.75 L7-Sep-2005 20:45:57 Vertical Displ section +N/S- (ft) (ft) 9712.49 6517.29 9743.10 6535.15 9774.34 6553.28 9804.87 6570.88 9834.89 6588.11 9866.31 6606.26 9896.62 6623.93 9926.96 6641.67 9957.31. 6659.38 9987.76 6677.29 10018.82 6696.03 10049.08 6714.62 10080.06 6733.74 10111.93 6753.57 10141.94 6772.32 10173.08 6791.85 10204.41 6811.59 10234.87 6830.89 10265.91 6850.55 10297.39 6870.31 6862.24 9294.48 6887.36 9325.13 6911.75 9354.79 6938.30 9386.99 6963.54 9417.41 6989.13 9448.10 7014.52 9478.63 7040.07 9509.51 7065.81 9540.58 7091.64 9571.68 7116.69 9602.03 7141.91 9632.63 7167.63 9663.86 7193.08 9694.70 Page Displ Total +E/W- displ (ft) (ft) 7218.23 9725.12 7243.67 9'755.97 7269.73 9787.46 7295.30 9818.24 7320.53 9848.52 7346.81 9880.20 7372.01 9910.75 7397.17 9941.32 7422.38 9971.91 7447.54 10002.60 7472.72 10033.86 7496.93 10064.29 7521.61 10095.44 7546.87 10127.48 7570.56 10157.64 7595.06 10188.92 7619.63 10220.40 7643.40 10250.98 7667.63 10282.15 7692.40 10313.78 47.59 47.61 47.63 47.66 47.68 47.71 47.73 47.76 47.78 47.81 47.83 47.85 47.88 47.90 7 of At Azim (deg) 47.92 47.94 47.97 47.99 48.01 48.04 48.06 48.08 48.10 48.12 48.14 48.15 48.16 48.18 48.19 48.20 48.20 48.21 48.22 48.23 1.64 MWD_IFR_MS 1.62 MWD_IFR_MS 1.23 MWD_IFR_MS 4.98 MWD_IFR_MS 6.05 MWD_IFR_MS 1.07 MWD_IFR_MS 2.66 MWD_IFR_MS 3.57 MWD_IFR_MS 5.60 MWD_IFR_MS 2.08 MWD_IFR_MS 4.58 MWD_IFR_MS 2.87 MWD_IFR_MS 3.59 MWD_IFR_MS 3.13 MWD_IFR_MS 8 DLS Srvy Tool (deg/ tool Corr 100f) type (degJ 6.88 MWD_IFR_MS 6.80 MWD_IFR_MS 0.53 MWD_IFR_MS 2.26 MWD_IFR_MS 1.39 MWD_IFR_MS 2.24 MWD_IFR_MS 2.68 MWD_IFR_MS 2.84 MWD_IFR_MS 1.44 MWD_IFR_MS 3.66 MWD_IFR_MS 5.20 MWD_IFR_MS 3.47 MWD_IFR_MS 2.94 MWD_IFR_MS 1.08 MWD_IFR_MS 1.37 MWD_IFR_MS 5.40 MWD_IFR_MS 7.27 MWD_IFR_MS 5.63 MWD_IFR_MS 5.59 MWD_IFR_MS 6.00 MWD_IFR_MS • • 171 12240.01 93.58 51.37 30.38 4867.81 10327.53 6889.18 7716.16 10344.07 48.24 4.46 MWD IFR MS 172 12270.73 93.30 51.11 173 12302.31 92.81 51.28 174 12333.82 93.04 50.75 175 12364.47 93.38 49.97 176 12396.02 93.41 49.74 177 12427.33 93.01 49.90 178 12458.46 92.47 49.78 179 12489.35 91.73 49.71 180 12520.27 91.07 49.63 [(c)2005 IDEAL ID10_2C_01] SCHLUMBERGER Survey Report --- -------- ------ ------- Seq Measured Incl Azimuth # depth angle angle - -_(ft) (deg) (deg) 181 12529.37 90.90 49.52 182 12600.00 90.90 49.52 [(c)2005 IDEAL ID10_2C_01] 30.72 31.58 31.51 30.65 31.55 31.31 31.13 30.89 30.92 Course length (ft) 9.10 70.63 4865.96 4864.28 4862.67 4860.96 4859.09 4857.33 4855.85 4854.71 4853.96 TVD depth (ft) 4853.80 4852.69 10358.01 6908.37 10389.36 6928.14 10420.66 6947.93 10451.13 6967.46 10482.51 6987.76 10513.66 7007.93 10544.64 7027.98 10575.40 7047.93 10606.21 7067.94 17-Sep-2005 20:45:57 Vertical Displ section +N/S- --(ft)-- --(ft)- 10615.28 7073.84 10685.68 7119.68 7740.07 10374.69 7764.64 10406.19 7789.10 10437.62 7812.67 10468.20 7836.74 10499.68 7860.63 10530.93 7884.39 10562.02 7907.95 10592.88 7931.51 10623.78 Page Displ Total +E/W- displ (ft) (ft) 7938.44 10632.87 7992:16 10703.48 48.25 1.24 48.26 1.64 48.27 1.83 48.27 2.77 48.28 0.73 48.28 1.38 48.29 1.78 48.29 2.41 48.30 2.15 8 of 8 At DLS Azim (deg/ (deg) 100f) 48.30 2.22 48.30 0.00 MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS Srvy Tool tool Corr type (deg) MWD_IFR_MS Projection to TD u T Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer Well No Installation/Rig BP Exploration (Alaska) Inc. L-215 Nabors 9ES ~. ~, , ,~ ... A~~~k~ 13i~ ~ ~~~ ~,; Dispatched To: AOGCC -Librarian Date Dispatched: 28-Sep-05 Dispatched By: Mauricio Perdomo Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James h..lonnson Received By: BP Exploration (Alaska- Inc. Petrotechnical Data Center (LR2-1) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojh@bp.com Lvvu jog ueuvery v l.l, lu-uz-u3 ~~ - (~ ~ Fi lc.., ~~ • • ~""`~ i,,. ~T Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Well No L-215PB1 Date Dispatched: Installation/Rig Nabors 9ES Dispatched By: AOGCC -Librarian 10-0 ct-05 Mauricio Perdomo Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James H. Johnson Received By: BP Exploration jAlaska) Inc. Petrotechnical Data CenterjLR2-1) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax: 907-564-4005 e-mail address: johnso'hCbp.com LWD Log Delivery V1.1,10-02-03 ~, ~, r,~ 'r f i 7 } ~ ., Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska- Inc. Dispatched To: Helen Warman Well No L-215P62 Date Dispatched: 0-Jan-00 Installation/Rig Nabors-9ES Dispatched By: Mauricion Perdomo LWD Log Delivery V1.1,10-02-03 Data No Of Prints No of Floppies Surveys 2 1 Received By: Please sign and return to: Drilling & Measurements LWD Division 2525 6ambell Street, Suite 400 Anchorage, Alaska 99501 nroset~slb.com Fax:907-561-8317 a~> -~~1 ~~i~ ~; { ~ ~ ~ ~ ~ ~ ~ ~ ~ {'~ ~ ~ ~ ~ ~ ~' + ~ a ~ '? FRANK H. MURKOWSKI, GOVERNOR 4iK>•a7~ O~ ~ Vro-7 t 333 W. T" AVENUE, SUITE 100 COI~TSERQ1l'1'IO1~T CO1~II~'IISSIOI~T t' ANCHORAGE, ALASKA 99501-3539 3; PHONE (907) 279-1433 FAX (907) 276-7542 Dave Wesley Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe L-2151 BP Exploration (Alaska) Inc. Permit No: 205-127 Surface Location: 2594' FSL, 3603' FEL, SEC. 34, T 12N, R 11 E, UM Bottomhole Location: 2365' FSL, 1253' FWL, SEC. 26, T 12N, R 11 E, UM Dear Mr. Wesley: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Cade, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty- four (24) hours notice for a representative of th ommission to witness any required test. Contact the Commission's petrol m eld inspector at (907) 659- 3607 (pager) . K. DATED thisZ day of August, 2005 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~, STATE OF ALASKA ALAS.. IL AND GAS CONSERVATION AMISSION PERMIT TO DRILL 20 AAC 25.005 1s1f~{~-~ ~'~Z3~Z~c~~ " ~~, ~~~~~~ ~G ~ ~ 2~tJ5' ~P~sl,~ ~i~ ~:~ L'v.~P~:r„ ~;Ott'lt1'ESS1 ia. Type of work ®Drill ^ Redrill ^ Re-Entry ib. Current Well Class ^ Exploratory ^ Development Oil one ^ Stratigraphic Test ®Service /__ ^ Development Gas Ingle one 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 2S100302630-277 11. Well Name and Number: ~ PBU L-2151 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 9028 TVD 4912 12. Field /Pool(s): Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surface: 2594' FSL 3603' FEL SEC 34 T12N R11 E UM 7. Property Designation: ADL 028238 Schrader Bluff , , . , , , Top of Productive Horizon: 1759' FSL, 705' FWL, SEC. 26, T12N, R11E, UM 8. Land Use Permit: 13. Approximate Spud Date: September 10, 2005 Total Depth: 2365' FSL, 1253' FWL, SEC. 26, T12N, R11E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 2926' 4b. Location. of Well (State Base Plane Coordinates): Surface: x- 583311 y- 5978317 Zone- ASP4 10. KB Elevation Planned (Height above GL): 78.3 feet 15. Distance to Nearest Well Within Pool L-202L3 is offset by 1485' 16. Deviated Wells: Kickoff Depth: 300 feet Maximum Hole Angle: 65 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.05) Downhole: 2125 Surface: 1648 18. asmg rogram: Size Specifications Setting Depth To Bottom uant~ty o emeht c.f. or sacks -Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data Driven 20" 166.4# X-56 Welded 80' 29' 29' 109' 109' 60 sx Arctic Set A rox. 12-1 /4" 9-5/8" 40# L-80 BTC 4235' 29' 29' 4264' 2709' 48 sx AS Lite, 378 sx Class 'G' 8-3/4" 7" 26# L-80 BTC-M 9000' 29' 29' 9029' 4913' 13 sx Class 'G' ~ 19. PRESENT W ELL CONDITION SUMMARY (To tie completed for Redrip AND Re-entry Operations) Total Depth MD (ft): Total Depth ND (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casin Len th Size Cement Volume MD TVD r on r Pr i n r Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ®Filing Fee, $100 ^ BOP Sketch ® Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact John Rose, 564-5271 Printed Name a Wesle Title Senior Drilling Engineer ~~,,~~ ~,. Prepared By Name/Number: Si nature y'^~° Phone 564-5153 Date~/~~~~~ Terrie Hubble, 564-4628 Commission Use Only Permit To Drill Number: ~ ,~ 2 API Number: 50_ d 2 J~'^ ~ 3 2 ~~~ Permit Approva Date: ~, See cover letter for other requirements Conditions of Approval: Samples quired ^ YesNo Mud Log Required ^ Yes ,~'No Hydro n Ifide Measures ^ Yes ~No Directional Su/rvey Required 'Yes ^ No Other: T~ ~ ~` 1~ L r' o' ~ P ~ G ~ lUl ,[ 1' C~ yc-Z e~~. ~` 9:a[~=~ Lr,~~1 d r~~ +'~°~wc !~ ~ . ~ ~~ ~ t. , f ~ c s ~~ lU t ~,~~ fF ~~'I~ ~ , t7 ..r~~;~ (''} ~ 3 ! ~ ,, ,~ c ~~ ~ d ~ ~~ APPROVED BY ~ .r~ D A roved B l• THE COMMISSION Date (j G Form 10-401 Rimed 06 2 4 ~°'~ ~ubmit ~fi Duplicate Well Name: L-215i Well Plan Summary T e of Well roducer or in'ector : USH Injector Surface Location: 2594' FSL, 3603' FEL, Sec. 34, T12N, R11 E As Built X = 583,310.85 Y = 5,978,317.21 L-2151 Pilot Hole 3104.7' FSL, 2542.3' FEL, Sec. 26, T12N, R11 E Tar et 1 Intra-OBd: X = 589,575 Y = 5,984,180 Z = 4760' TVDss L-215i Pilot Hole 3599.4' FSL, 1925.9' FEL, Sec. 26, T12N, R11 E Tar et 2 Intra-OBd: X = 590,185 Y = 5,984,682 Z = 4810' TVDss L-215i Pilot Hole 4134.5' FSL, 1258.9' FEL, Sec. 26, T12N, R11 E Tar et 3 Intra-OBd: X = 590,845 Y = 5,985,225 Z = 4860' TVDss L-215i Pilot Hole 4617.3' FSL, 657.5' FEL, Sec. 26, T12N, R11 E Tar et 4 TD Intra-Obd: X = 591,440 Y = 5,985,715 Z = 4905' TVDss L-215i Target 1 Top Nb: 1758.9' FSL, 4574.9' FEL, Sec. 26, T12N, R11 E X = 587,560 Y = 5,982,810 Z = 4,260' TVDss L-215i Target 2 Top OBd: 2139.8' FSL, 4229.9' FEL, Sec. 26, T12N, R11 E X = 587,900 Y = 5,983,195 Z = 4620' TVDss L-2151 Target 3 TD 2365.4' FSL, 4026.0' FEL, Sec. 26, T12N, R11 E X = 588,101 Y = 5,983,423 Z = 4834' TVDss l AFE Number: ORD5M3566 Ri Nabors 9ES GL: 49.8' KB: 28.5' Estimated Start Date: September 10 , Operating days to complete: 21.84 2005 12 887 Pilot hole TD: ' MD Mainbore KOP: 6511' MD Mainbore TD: 9028' MD TVD: 4984' TVD: 3679' TVD: 4912' Max Inc: 87° Inc: 65° Max Inc: 65° KBE: 78.3' KBE: 78.3' KBE: 78.3' Well Design: USH Grassroots Schrader Injector with appraisal pilot hole. 4-~h" X 3-'/2" TCII Com letion. The O sands will have a 4-~h" X 3-'h" TCII Completion in the Schrader Bluff. Current Well Information General L-2151 P61 Distance to Nearest Property: Distance to Nearest Well in Pool: L-215i Mainbore Distance to Nearest Property: Distance to Nearest Well in Pool: API Number: Well Type: Current Status: Conductor: BHP (PB1): BHP (Mainbore): BHT: 660' from PBU 2510' to L-216 at top Na 2926' to PBU boundary 1485' to L-202L3 at top OA. 1673' to L-216 at top Na ~ Development -Orion Schrader Injector New well, 20" conductor, driven 20", 166.4#, X-56, welded 1802' psi C~ 4005' TVDss (Top Ma - 8.7 ppg EMW). 1789 psi ~ 3975' TVDss (Top Ma - 8.8 ppg EMW). 90°F ~ 4834' TVDss (estimated) '/a Mile Wellbore Near Wellbore Mechanical Integrity Summary: No wells are within ~/a mile radius of L-215i /there are no mechanical integrity issues. ~ L-215i Well Plan Page a • 7 Formation To s Dss and Estimated Pore Pressures L'215P61 Tops E.rt. Formation Tops Uncertainty ommercea Hydrocarbon Bearing Est. Pore Press. Est. Pore Press. Formation (TVDss) (feet) (Yes/No) (Psi) (ppg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -260 +/-50' No ttT 8.7 SVB -885 +/-50' No 398 8.7 Fault #1 - L Pad Faun -950 +/-150' M.D. -se e fault section b a28 SV5 -1490 +/-50' No 671 8.7 SV4 -1625 +/-50' Poss. Gas Hydrates 731 8.7 Base Permafrost -1690 +/-50' No 761 8.7 SV3 -2020 +/-50' Poss. Gas Hydrates 909 8.7 SV2 -2190 +/-50' Poss. Gas Hydrates 986 8.7 SV1 -2530 +/-50' Poss. Gas Hydrates or Free Gas 1139 8.7 UG4 -2850 +/-50' Thin coal 1283 8.7 Fauk #2 -2870 +/-150' M.D. -see fault section 1292 8.7 UG4A - Faulted To -2870 +/-50' Heavy oil betty 2865 and 2980' SS 1292 8.7 UG3 -3180 +/-50' Thin coals 1431 8.7 UGi -3705 +/-50' Heavy 011 betty 3sss - 3szo' SS 1667 8.7 Ma -4005 +/-50' Possible Heavy Oil betty 4005-4035' SS 1802 8.7 Mb1 -4050 +/-50' Possible Heavy Oil belw 4045 -4080' sS 1823 8.7 Mb2 -4135 +/-50' Possible Heavy Oil betty 4735 - 4150' SS 1861 8.7 Mc -4235 +/-50' No 7906 8.7 Na -4290 +/-25' No 1931 8.7 Nb -4320 +/-25' ves 1944 8.7 Nc -4370 +/-25' ves 1967 8.7 OA -4475 +/-25' ves 7991 8.6 OBa -4545 +/-25' Yes 2023 8.6 OBb -4610 +/-25' ves 2051 8.6 Oec -4675 +/-25' ves 2080 8.6 OBd -4745 +/-25' ves 2112 8.6 OBe not reached -4820 +/-25' ves 2145 8.6 T.D. -4905 7 Formation To s TVDss and Estimated Pore Pressures L'2~ 51 Tops Est. Formation Tops Uncertainty ommercea Hydrocarbon Bearin8 Est. Pore Press. Est. Pore Press. FOrmat%On (TVDss) (feet) (Yes/No) (Psi) (ppg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: AIt formation to s are r wired from surface to TD for all new wells UG3 Above KOP -3180 KOP -3600 UG1 -3705 +/-50' Heavy Oil betty 3azs - 3920' ss 1667 8.7 Ma -3975 +/-50' Possible Heavy Oil betty 3975 -4005' SS 1789 8.7 Mb1 -4015 +/-50' Possible Heavy Oil betty 4075-4080' SS 1807 8.7 Mb2 -4095 +/-50' Possible Heavy Oil betty4095-4150' SS 1843 8.7 Mc -4185 +1-50' No 1883 8.7 Na -4235 +/-25' No 1906 8.7 Nb -4260 +/-25' ves 1917 8.7 Nc -4300 +/-25' No 1935 8.7 OA -4390 +/-25' No 1954 8.6 OBa -4455 +/-25' ves 1982 8.6 OBb -4510 +/-25' ves 2007 8.6 OBc -4565 +/-25' ves 2031 8.6 OBd -4620 +/-25' ves 2056 8.6 OBe -4685 +/-25' ves 2085 8.6 OBf -4730 +/-25' ves 2105 8.6 OBf_Base -4775 +/-25' No 2125 8.6 T.D. -4634 q,3 L-215i Well Plan Page ~ ~ Mud Pro ram: 12'/a" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densi Funnel Vis PV YP FL Chlorides PH Initial 8.5 - 9.2 250-300 20-45 50-70 NC-8.0 <500 8.5-9.0 Base Perm 9. .5 225-250 20-40 30-45 8.0 <500 8.5-9.0 Interval TD 9. 225-250 15-20 30-40 5.0-7.0 <500 8.5-9.0 y 8 3/a" Production Holes Mud Pro erties: Freshwater Mud (LSND) Interval Densit Funnel Vis PV YP FL H Chlorides MBT Pilot Hole 8.8 - 9.3 38-50 12-18 23-30 4-6 9.0-9.5 <600 < 20 Mainbore 8.8 - 9.3 38-50 12-18 23-30 4-6 9.0-9.5 <600 < 20 Survey and Logging Program: 12-'/a" Hole Section: Surface Gyro will be needed (run to 1200' or as conditions dictate) O en Hole: MWD / GR Cased hole: None 8-3/a" Pilot Hole: MWD GR / Res /Den / Neu / PWD (All real-time with recorded porosity) - NMR recorded mode 8-3/a" Mainbore: MWD GR / Res (real-time) -Den / Neu (recorded-mode) Cased Hole: USIT Bond Log Casin ubin Pro ram Hole Size Csg / Tb O.D. WdFt Grade ~ Conn ~ Burst si Collapse si Length Top MD /TVDrkb Bottom MD /TVDrkb Driven* 20" 166.4# X-56 Welded 80' 29' / 29' 109' / 109' 12-'/a" 9 5/e" 40# L-80 BTC 5,750 3,090 4235' 29' / 29' 4264' / 2709' 8-3/a" 7" 26# L-80 BTC-M 7,240 5,410 9000' 29' / 29' 9029' / 4913' Tubin 4'/z" 12.60# L-80 TCII 8,430 7,500 7454' 29' / 29' 7483' / 4094' Tubin 3'/z" 9.30# L-80 TCII 10,160 10,530 1078' 7483' / 4094' 8561' / 4644' Bit Recommendations /J BHA Hole Size De the MD Bit T e Nozzles K-Revs Hours Surface 12-'/a" 0' - 2000' Hu hes MXC-1 18/18/18/16 Surface 12-'/a" 2000' - 4263' Hu hes MXC-1 18/18/18/16 PB1 8-3/a 4263' - 12,886' H calo DSX147GNVW 6x14 Mainbore 8-3/a 6511' - 9028' H calo DSX147GNVW 6x14 Motors and Re uired Do le s BHA Motor Size and Motor Re uired Flow Rate RPM's Re uired Do le s 1 9 5/a" Anadrill A962M3445 Mud Motor, 1.83° 600 - 700 gpm 40-60 1.5°/100' initial build with 12-~/a" strin stabilizer ro to +1200' 4.0°/100' final build 2 9-g/8" Anadrill A962M3445 Mud Motor, 1.50° 600 - 700 gpm 60-100 4.0°/100' Build with 12-'/a" strin stabilizer 65° Hold 3 6-3/a" Anadrill A675M7850XP Mud motor, with 500 - 600 gpm 60-100 65° Hold 1.50° ABH with 8.75" strin stabilizer 4.0°/100' Build 4 6-3/a" Anadrill A675M7850XP Mud motor, with 500 - 600 gpm 60-100 65° Hold 1.50° ABH with 8.75" strin stabilizer 4.0°/100' Drop Surface and Anti-Collision Issues Surface Shut-in Wells: Nearb Wells L-2161 L-1031 L-201 L-1191 Distance to L-2151 30.32 14.72 14.94 29.64 Due to being less that 30' from the L-2151 surface location, L-1031, L-210, L-1191 will require surface shut-in L-215i Well Plan Page 3 • • or dispensation in order to move over well L-2151. L-216i should be evaluated before the rig move as to whether it will also require shut in for the rig move. All 4 of these wells should also be evacuated in term of the need to remove the well houses and/or their interference potential in terms of moving 9ES on/off well L- 215i. Risk Basing: One well had to be risk based at 1/200 in order to pass close approach guidelines WKUPST-01 is an older exploration well (vertical well) which has been plu~and abandoned. ~ WKUPST-01 ~ 6052.36-ft ~ 209-ft ~ 5986.24-ft ~ Use Traveling Cylinder ~ Close Approach Shut-in Wells: There are NO close approach wells requiring subsurface isolation. Close Aaaroach Well List: Well Name Ctr-Ctr Distance Reference. MD Allowable Deviation Precautiona Comment L-103 15.06' 400.37' 8.34' Use Travelin C linder G ro L-119 27.97' 651.7' 16.84' Use Travelin C linder G ro L-201 15.34' 300.28' 10.14' Use Travelin C linder G ro L-202 90.68' 449.31' 83.05' Use Travelin C linder G ro L-210 45.21' 249.69' 40.96' Use Travelin C linder G ro L-212 64.42' 788' 51.16' Use Travelin C linder G ro L-216 27.78' 599.4' 17.5' Use Travelin C linder G ro Cement Calculations: Casinc~Size: 9 5/8-in 40-Ib/ft L-80 BTC -Single Stage Basis: Lead: 250% a es over gauge hole in permafrost, 30% excess over gauge hole below permafrost Lead TOC: urf e Tail: 1,000' pen hole with 30% excess, plus 80' shoe track Tail TOC: 3263' MD L~~ ~~~ Total Cement Volume: Spacer 75 bbls of Viscosified Sp er weighted to 10.0 ppg (Mud Push II) Lead 502 bbls, 2774 cuft, masks 10.7 Ib/ al ASL G + adds - 4.44 cuft/sk Tail 79 bbls, 442 cuft, 378 sks 15.8 Ib/ al Class G + adds -1.17 cufUsk Tem BHST - 60° F, BHCT 80° F estimated b Schlumber er Depths 12'/a" TD at 4263' TMD -Base of Permafrost at 2091' -Base Conductor at 158' TMD In the event that cement is not circulated to surface during the initial surface casing Mdcement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casin Size: 7" 26 Ib/ft L-80 BTC-M -Single Stage Basis: Lead: None Lead TOC: N/A Tail: 2139' o en hole with 30% excess, plus 80' shoe Tail TO 688 MD minimum cement to at 500' to Ma Total Cement Vol Wash 30 bbls CW100 3 acer 30 bbls of Viscosified S acer Mud ush II Desi n Wei hted to 10.3 Tail 110 bbls, 616 cuft, 513 sks 15.8 Ib/ al G + Gasblok -1.20 cuft/sk Tem BHST = 90° F, BHCT 80° F estimated b Schlumber er depths 8 3/a" TD at 9028' TMD -Top Ma Sand at 7389' TMD Centralizer Recommendations: 9 5/e" Casing Centralizer Placement a) Run (25) 9 5/e" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 3263' MD (1000' MD above the shoe). b) Run 2 bow-spring centralizers on either side of the TAM Port Collar (if run). c) This centralizer program is subject to change due to actual hole conditions. 7" String Centralizer Placement a) Place 2 rigid straight blade centralizers back to back at the very bottom of the shoe joint. Do not L-215i Well Plan Page 4 • • run any centralizers on the next two full joints. b) With the exception stated above, run one centralizer per joint, floating across the entire joint up to 6889'] MD (500' MD above Ma sand). Zonal isolation with cement is required across the Ma sands. the centralizer program is subject to change pending modeling and hole conditions. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. Due to test pressures not exceeding , S,000psi it will not be necessary to have two sets of pipe rams installed at all times. BOP regular test frequency for I-215i will be 14 days. ~ Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 7" Casing Test: • Integrity Test - 8-3/4" hole: • Kick Tolerance: • Planned completion fluid: 2,125 psi -Base of Schrader (8.6 ppg ~ 4,775' TVDss) 1,648 psi -Based on a full column of gas C~ 0.10 psi/ft ~ 4,000 psi/250 psi Rams 2,500 psi/250 psi Annular 4,000 psi LOT 'from 9-5/8" shoe 0. bls with an 11.3 ppg EMW LOT imated 9.1 ppg Brine / 6.8 ppg Diesel Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul ali drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. L-215i Well Plan Page 5 • • Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Schrader in the Polygon 1A fault block is expected to be normal pressured at 8.6-8.7 ppg EMW. ~ This pressure is estimated based on offset well pressures and material balance. 11. Hydrates and Shallow gas ~ A. Gas Hydrates are expected at L-Pad near the base of the permafrost as gas hydrates have been encountered on may L-Pad wells. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. B. Recommended practices and precautions for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SVi . III. Lost Circulation/Breathing A. Lost circulation is not expected to be a problem with the L-Pad faults associated with this well. B. We do not expect breathing on this well. i IV. Kick Tolerance/Integrity Testing A. The 9 $/8" casing will be cemented to surface. B. The 7" casing will be cemented with 15.8 Ib/gal tail cement to a minimum of 500' MD above the Ma sand 6889' MD. C. The Kick Tolerance for the 8-3/4" holes are ~50 bbls with 9.3 ppg mud, 11.3 ppg LOT, and an 9.0 ppg i pore pressure. D. Integrity Testing -LOT to a minimum of 11.3 ppg EMW. V. Stuck Pipe A. We do not expect stuck pipe if the hole is kept adequately clean. VI. Hydrogen Sulfide L-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. No measurable H2S is being produced from the formation at this time. However 10 ppm is measured regularly at L-Pad as a result of the use of Ivishak gas lift gas. All L-Pad gas lift wells will likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S levels are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: L-201 5 ppm L-201 5 ppm L-106 5 ppm Max Recorded on L-Pad: L-107 20 pm VII. Faults A. Two faults will be crossed while drilling this well. No losses or wellbore instability issues are expected to be associated with these faults. Details are listed below for reference: Fault 1 (SV6): 1045' MD 1029' TVD 950' TVDss Throw: 35' W Fault 2 (Ugnu UG4 in P61) 4810' MD 2944' TVD 2865' TVDss Throw: 110' W CONSULT THE L-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION L-2151 Well Plan Page 6 • • L-215i Drill and Complete Procedure Summary ***All pre-rig work should be charged off against the pre-drill AFE # ORD5M3566*** Pre-Rig Work: 1. The L-2151 conductor has been set. See As-Built for coordinates. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move (shut-in wells L- 103i, L-201 & L-1191 and remove well houses as needed) and "simops" production. Rig Operations: 1. MIRU Nabors 9ES. Nipple up diverter spool and function test diverter. PU 5" DP as required to drill the surface hole and stand it back in the derrick. (NOTE: 5" DP will be used on this well to eliminate pump rate/pressure related issues.) 2. MU 12-~/a" drilling assembly with MWD/GR (real-time) and directionally drill surface hole to approximately 4264' MD. The ~ actual surface hole TD will be +/-100' TVD below the top of the SVi sands. 3. Run and cement the 9 5/e", 40.0-Ib/ft. surface casing back to surface. A TAM Port Collar will be run as per the Co Rep and if run a TAM shifting tool should be on location. 4. ND diverter spool and NU casing /tubing head. NU ROPE and test to 4,000 psi. PU 5" DP as needed to TD the pilot hole / (12,887' TMD) and stand back in the derrick. 5. MU 8-3/a" drilling assembly with MWD Gr/Resistivity/Neutron/Azimuthal Density (real-time & recorded modes) - NMR (recorded mode) and RIH to the float collar picking up 5" DP. Test the 9-5/a" casing to 3500 psi for 30 minutes. ~ 6. Drill shoe track and clean-out rat-hole. Circulate and condition cement contaminated mud. Displace over to new 8.8 ppg mud. Drill new formation to 20' below 9 5/8" shoe and perform FIT (target FIT = 11.3 ppg). 7. Drill ahead to pilot hole TD at 12,887' MD, (Final TD to be determined based on OWC in OBd). Condition the hole for ~ P&A plug. POOH to LD BHA standing back the 5" DP. 8. PU and RIH with 1,200' of 3-'h" tubing cement stinger on 5" DP to the 8 3/a" TD and spot approximate 113' balanced 15.8 ppg Class G cement abandonment plugs in the8 3/a" hole from TD at 12,887' to 7322' TMD (500' the top of the Ma sand). After spotting each of the first 4 cement plugs, pull 100' above the top of the plug and then wash back down to the Ic lated top of the plug in preparation to set the next plug. After spotting the final 5 plug (bringing the top of cement -~ to 30 ,pull 3 stands above the plug and circulate out the well in preparation to POOH for the next drilling BHA. 9. M 3/a" drilling assembly with MWD GR/Res (real time) -Neutron/Density (recorded mode) and RIH reaming and washing to top of cement plug (037322'). Place "sufficient weight on the plug to confirm its location and to confirm that the plug has set and a competent plug is in place" (AOGCC). 10. POOH to 6511' MD and low-side sidetrack the existing wellbore to continue with drilling the Schrader injection mainbore. j Drill ahead to 9028' MD (base of OBd target plus 250'). Circulate and condition hole, make a short trip if necessary, TOOH to run casing. 11. Run and cement the 7" production casing as required to cover all significant hydrocarbon intervals (top cement at 500' above Ma sand inimum). Displace the casing with ±8.5 ppg heated seawater during cementing operations. Pressure test casing to ,00 psi for 30 minutes at plug bump. Freeze protect the 7" x 9 5/e" annulus. 12. RU Schlumbe r, PU DPC guns and RIH w/ 165' of 4.5" Power Jet 5 spf perforation assembly w/ - 135' of spacer pups. RIH to PBTD and circulate the well over to 9.1 ppg brine. Space out utilizing GR and RA tags in 7" casing. Once spaced out correctly, confirm cement compressive strength is at least 2,000 psi. Perforate Nb, OA, OBa, OBb, and OBd. PU to above top pert and circulate wellbore, monitor for losses. POOH, LD perforation assembly. 13. RU Schlumberger E-line and RIH with gage ring and junk basket to recover any pert debris. Repeat until clean. Run a ~ USIT/GR log. USIT will be primary depth control. 14. Run the 4-~/z" X 3-Yz", L-80 TCII completion with a straddle packer assembly and injection mandrels (torque turn connections). Run in the lockdown screws and set the packers. Test the production casing/tubing annulus and tubing to 4,000 psi each. Shear the DCK shear valve. 15. Install FMC TWCV. Nipple down the ROPE. Nipple up and test the tree to 5,000 psi. 16. Freeze protect the well to -2,500' TVD. Install BPV in tubing hanger. Install a VR plug in the 7"x 4-~/z" annulus valve and secure the well. Assure that IA/OA are both protected with two barriers. Rig down and move off. Post-Rig Work: 1. R/U Slickline and pull ball and rod / RHC from the tailpipe. 2. Replace the DCK shear valve with a dummy GLV. 3. Pull dummy valves in injection mandrels and replace with injection valves. 4. Pull VR plug. L-215i Well Plan Page 7 by L-215PB1 (P8) Proposal Schlumberger CIieM: BP Exploration Alaska Vertlcel Sedbn Azimuth: 45.000° Fktkl: Prudhoe Bay Unit - WOA VeNcal Sactlon Origin: N 0.000 ft, E 0.000 ft O StrucWre 1 Slot: L-PAD I L-215 O~'1 ND Reference Datum: Rotary Table Well: Plan L-215 (N-T) f~ Borohole: Plan L-215PB1 pppro TVD Refererxe ENvatlon: 78.30 ft relative to MSL Sea Bed / Ground level Ek+vadon: 49.80 ft relative to MSL UWIIAPM: 50029 Magnetle Dedinatlon: 24.306° Survey Name I Date: L-215PB1 (P8) /August 14, 2005 Total FNrld Strength: 57625.176 nT Tort 1 AHD I DDI I ERD ratb: 90.633° 111017.18 ft 16.412 / 2.211 Magnetlc Dip: 80.815° Gdd Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Deelhutlon Dab: September 20, 2005 Locetlon Ladlong: N 70.35072769, W 149.32359328 Magnetic Dacllnatlon Model: BGGM 2004 Locetlon Gdd NIE Y/X: N 5978317.210 ftUS, E 583310.850 ftUS North Reference: True North Grid Convergence AngN: 10.63702199° Total Car Mag North a Tnre North: 124.306° Cammenta Measured incNnation Azimuth Subsea TVD Typ Vertlcel Abng Note NS EW DLS Tod Face Build Rats Walk Rata Northing Fasting LatiWde longitude Depth Section Departure ft ft ft R ft ft ft 00 R de 00 R 1~ R 11US ftUS KIC V.VV V.W IV.UU -/8.3U U.UU V.UU U.UU U.W U.UU U.W IU.WM U.W U.UU Sy/1531/.Ll Dd33lU.2Sb N /U.3t)U/L/tif! W 74y.313b`d3"Ltl KOP Bld 1.5/100 3t~.00 0.00 10.00 221.70 300.00 0.00 0.00 0.00 0.00 0.00 10.OOM 0.00 0.00 5978317.21 583310.85 N 70.35072789 W 149.32359328 G1 338.30 0.57 10.00 260.00 338.30 0.16 0.19 0.19 0.03 1.50 10.DOM 1.50 0.00 5978317.40 583310.88 N 70.35072821 W 149.32359301 Crv 3/100 400.00 1.50 10.00 321.69 399.99 1.07 1.31 1.29 0.23 1.50 17.83M 1.50 0.00 5978318.50 583311.06 N 70.35073121 W 149.32359143 500.00 4.48 17.83 421.54 499.84 5.62 6.52 6.30 1.65 3.00 19.40M 2.98 7.83 5978323.52 583312.43 N 70.35074489 W 149.32357988 600.00 7.47 19.40 520.99 599.29 14.96 16.93 16.15 5.01 3.00 2.35G 3.00 1.57 5978333.41 583315.68 N 70.35077181 W 149.32355262 Crv 4/100 684.22 10.00 20.00 604.23 682.53 26.53 29.72 28.19 9.33 3.00 42.41 G 3.00 0.71 5978345.50 583319.87 N 70.35080471 W 149.32351753 700.00 10.47 22.34 619.75 698.05 29.10 32.52 30.81 10.34 4.00 40.10G 3.01 14.84 5978348.13 583320.85 N 70.35081185 W 149.32350930 800.00 13.77 33.22 717.52 795.82 49.15 53.47 49.18 20.33 4.00 29.46G 3.30 10.88 5978366.61 583330.63 N 70.35086205 W 149.32342827 900.00 17.37 39.82 813.84 892.14 75.68 80.28 70.61 36.41 4.00 23.10G 3.59 6.60 5978388.21 583346.47 N 70.35092059 W 149.32329769 SV6 975.16 20.17 43.24 885.00 963.30 99.80 104.45 88.67 52.47 4.00 19.86G 3.72 4.55 5978406.45 583362.33 N 70.35096992 W 149.32316729 1000.00 21.10 44.18 908.25 986.55 108.55 113.20 94.99 58.52 4.00 18.98G 3.77 3.77 5978412.84 583368.31 N 70.35098721 W 149.32311818 Crv 4/100 1023.66 22.00 45.00 930.26 1008.56 117.25 121.89 101.18 64.63 4.00 O.OOG 3.79 3.47 5978419.10 583374.34 N 70.35100412 W 149.32306863 Fault 1 1045.02 22.85 45.00 950.00 1028.30 125.39 130.04 106.95 70.39 4.00 O.OOG 4.00 0.00 5978424.92 583380.04 N 70.35101986 W 149.32302186 1100.00 25.05 45.00 1000.24 1078.54 147.71 152.36 122.73 86.17 4.00 O.OOG 4.00 0.00 5978440.88 583395.64 N 70.35106297 W 149.32289373 1200.00 29.05 45.00 1089.28 t 167.58 193.19 197.83 154.88 118.32 4.00 O.OOG 4.00 0.00 5978473.38 583427.43 N 70.35115081 W 149.32263269 1300.00 33.05 45.00 1174.93 1253.23 244.76 249.41 191.35 154.79 4.00 O.OOG 4.00 0.00 5978510.25 583463.49 N 70.35125044 W 149.32233663 1400.00 37.05 45.00 1256.78 1335.08 302.18 306.83 231.95 195.40 4.00 O.OOG 4.00 0.00 5978551.30 563503.64 N 70.35136136 W 149.32200699 1500.00 41.05 45.00 1334.42 1412.72 365.17 369.82 276.50 239.94 4.00 O.OOG 4.00 0.00 5978596.33 583547.68 N 70.35148304 W 149.32164537 1600.00 45.05 45.00 1407.47 1485.77 433.43 438.08 324.76 288.20 4.00 O.OOG 4.00 0.00 5978645.12 583595.40 N 70.35161489 W 149.32125354 1700.00 49.05 45.00 1475.59 1553.89 506.61 511.26 376.51 339.95 4.00 O.OOG 4.00 0.00 5978697.44 583646.56 N 70.35175626 W 149.32083340 SV5 1722.19 49.94 45.00 1490.00 1568.30 523.48 528.13 388.44 351.88 4.00 O.OOG 4.00 0.00 5978709.50 5B3658.36 N 70.35178884 W 149.32073655 1800.00 53.05 45.00 1538.44 1616.74 584.37 589.02 431.49 394.93 4.00 O.OOG 4.00 0.00 5978753.02 583700.92 N 70.35190646 W 149.32038699 1900.00 57.05 45.00 1595.71 1674.01 666.32 670.97 489.44 452.88 4.00 O.OOG 4.00 0.00 5978811.61 583758.22 N 70.35206476 W 149.31991650 SV4 1955.54 59.27 45.00 1625.00 1703.30 713.50 718.15 52280 486.24 4.00 O.OOG 4.Q0 0.00 5978845.33 583791.20 N 70.35215589 W 149.31964564 2000.00 61.05 45.00 1647.12 1725.42 752.07 756.72 550.07 513.51 4.00 O.OOG 4.00 0.00 5978872.91 583818.17 N 70.35223039 W 149.31942422 End Crv 2020.66 61.88 45.00 1656.99 1735.29 770.22 774.87 562.91 526.35 4.00 O.OOG 4.00 0.00 5978885.88 583830.86 N 70.35226546 W 149.31931999 Base Perm 2090.70 61.88 45.00 1690.00 1768.30 831.99 836.84 606.59 570.03 0.00 O.OOG 0.00 0.00 5978930.04 583874.05 N 70.35238477 W 149.31896536 Crv 4!100 2120.66 61.88 45.00 1704.12 1782.42 858.42 863.07 625.27 588.71 0.00 -6.12G 0.00 0.00 5978948.93 583892.52 N 70.35243582 W 149.31881364 • WeIlDesign Ver SP 1.0 Bld( doc40x_56) L-215\Plan L-215 (N-T)1PIan L-215PB1\L-215PB1 (P8) Generated 8/14/2005 9:14 PM Page 1 of 2 Comments Measured Inclinatlon Azimuth SulrSea TVD TVD Venieal Along Nob NS EW DLS Tod Face Build Rate Walk Rate Northing Easdng Latltude Longitude Dap<h ~~ Depanure ft d ft ft ft ft ft ft d 100 ft d de 100 ft 100 ft ftU3 ftU3 cna~rv cin4.aa 04.43 a4./u 1/33.1[ io11,4L x15./1 a~v.3o 555.oa 5L`J.1L 4.uu u.uw 3.yt3 -u.4/ 5a/d5tly.yy SV3 2849.66 64.43 44. 70 2020.00 2098.30 1515.40 1520.05 1092.98 1050.91 0.00 O.OOG 0.00 0.00 5979420.90 SV2 3243.59 64.43 44. 70 2190.00 2268.30 1870.75 1875.42 1344.78 1300.86 0.00 O.OOG 0.00 0.00 5979676.25 SV1 4031.46 64.43 44. 70 2530.00 2608.30 2581.47 2586.14 1850.00 1800.75 0.00 O.OOG 0.00 0.00 5980186.94 9-5/8" Csg P 4263.18 64.43 44. 70 2630.00 2708.30 2790.50 2795.18 1998.59 1947.78 0.00 O.OOG 0.00 0.00 5980337.14 UG4 4761.39 64.43 44. 70 2845.00 2923.30 3239.93 3244.61 2318.06 2263.89 0.00 O.OOG 0.00 0.00 5980660.08 Fault 2 480771 64.43 44. 70 2864.99 2943.29 3281.71 3286.39 2347.76 2293.28 0.00 O.OOG 0.00 0.00 5980690.10 UG4A 4807.74 64.43 44. 70 2865.00 2943.30 3281.73 3286.42 2347.78 2293.29 0.00 O.OOG 0.00 0.00 5980690.12 UG3 553767 64.43 44. 70 3180.00 3258.30 3940.19 3944.88 2815.84 2756.43 0.00 O.OOG 0.00 0.00 598116326 Crv 4/100 6503.80 64.43 44 .70 3596.93 3675.23 4811.72 4816.42 3435.37 3369.43 0.00 -3.03G 0.00 0.00 5981789.50 6510.95 64.72 44 .68 3600.00 3678.30 4818.18 4822.88 3439.96 3373.97 4.00 40.30G 3.99 -0.23 5981794.14 6600.00 67.46 47 .17 3636.09 3714.39 4899.55 4904.27 3496.56 3432.46 4.00 39.29G 3.07 2.80 5981851.38 6700.00 70.57 49 .86 3671.91 3750.21 4992.72 4997.63 3558.37 3502.40 4.00 38.33G 3.12 2.68 5981913.96 End Crv 6770.82 72.81 51 .70 3694.15 3772.45 5059.61 5064.86 3600.88 3554.49 4.00 O.OOG 3.15 2.60 5981957.04 UG1 6807.51 72.81 51. 70 3705.00 3783.30 5094.41 5099.90 3622.60 3581.99 0.00 O.OOG 0.00 0.00 5981979.07 Ma 7822.36 72.81 51. 70 4005.00 4083.30 6057.29 6069.40 4223.51 4342.79 0.00 O.OOG 0.00 0.00 5982588.34 M61 7957.67 72.81 51. 70 4045.00 4123.30 6185.68 6198.66 4303.63 4444.23 0.00 O.OOG 0.00 0.00 5982669.58 M62 8262,12 72.81 51. 70 4135.00 4213.30 6474.54 6489.51 4483.91 4672.47 0.00 O.OOG 0.00 0.00 5982852.36 Mc 8583.49 72.81 51. 70 4230.00 4308.30 6779.45 6796.52 4674.20 4913.40 0.00 O.OOG 0.00 0.00 5983045.30 Na 8769.55 72.81 51. 70 4285.00 4363.30 6955.98 6974.26 4784.36 5052.88 0.00 O.OOG 0.00 0.00 598315700 Nb 8871.03 72.81 51. 70 4315.00 4393.30 7052.27 7071.21 4844.45 5128.96 0.00 O.OOG 0.00 0.00 598321793 NC 9040.17 72.81 51. 70 4365.00 4443.30 7212.75 7232.79 4944.61 5255.76 0.00 O.OOG 0.00 0.00 5983319.47 OA 9378.46 72.81 51. 70 4465.00 4543.30 7533.71 7555.96 5144.91 5509.36 0.00 O.t~G 0.00 0.00 5983522.56 OBa 9615.26 72.81 51. 70 4535.00 4613.30 7758.38 7782.17 5285.12 5686.88 0.00 O.OOG 0.00 0.00 5983664.73 OBb 9835.14 72.81 51. 70 4600.00 4678.30 7967.00 7992.23 5415.32 5851.72 0.00 O.OOG 0.00 0.00 5983796.74 OBc 10071.94 72.81 51. 70 4670.00 4748.30 8191.67 8218.44 5555.53 6029.24 0.00 O.OOG 0.00 0.00 5983938.90 Crv4/100 10186.35 72.81 51 .70 4703.82 4782.12 8300.23 8327.75 5623.28 6115.02 0.00 -1.01G 0.00 0.00 5984007.59 10200.00 73.35 51 .69 4707.79 4786.09 8313.20 8340.80 5631.37 6125.26 4.00 -7.01G 4.00 -0.07 5984015.80 10300.00 77.35 51 .62 4733.08 4811.38 8409.28 8437.53 5691.39 6201.12 4.00 -0.99G 4.00 -0.07 5984076.65 OBd 10333.34 78.68 51. 59 4740.00 4618.30 6447.67 8470.14 5711.65 6226.68 4.00 -0.98G 4.00 -0.07 598409719 10400.00 81.35 51 .55 4751.55 4829.85 8506.89 8535.79 5752.45 6278.10 4.00 -0.98G 4.00 -0.07 5984138.56 L-215P81 Tgt 1 10466.25 84.00 51 .50 4760.00 4838.30 8572.16 8601.49 5793.33 6329.54 4.00 -7.54G 4.00 -0.07 5984180.00 10500.00 85.34 51 .32 4763.14 4841.44 8605.56 8635.10 5814.29 6355.81 4.00 -7.53G 3.97 -0.53 5984201.25 End Crv 10528.70 86.48 51 .17 4765.18 4843.48 8634.01 8663.72 5832.21 6378.13 4.00 O.OOG 3.97 -0.52 5984219.41 Crv 4/100 11256.07 86.48 51 .17 4809.89 4888.19 9355.80 9389.72 6287.40 6943.70 0.00 6.55G 0.00 0.00 5984680.82 L-215PB1 Tgt 2 11257.92 86.55 51 .18 4810.00 4888.30 9357.64 9391.57 6288.56 6945.14 4.00 6.66G 3.97 0.46 5984682.00 End Crv 11260.50 86.65 51 .19 4810.15 4888.45 9360.20 9394.14 6290.17 6947.14 4.00 O.OOG 3.97 0.47 5984683.63 Crv 4/100 12113.59 86.65 51 .19 4859.97 4938.27 10206.87 10245.78 6823.91 7610.78 0.00 -68.97G 0.00 0.00 5965224.66 L-215PB1 Tgt 3 12114.13 86.66 51 .17 4860.00 4938.30 10207.40 10246.31 6824.24 7611.20 4.00 -96.94G 1.44 -3.74 5985225.00 End Crv 12114.31 86.66 51 .16 4860.01 4938.31 10207.58 10246.49 6824.36 7811.34 4.00 O.OOG -0.48 -3.98 5985225.12 TD 12886.31 86.66 51 .16 4905.00 4983.30 10973.81 11017.18 7307.64 8211.67 0.00 O.OOG 0.00 0.00 5985715.00 Legal Descrfotion: Northing (Y) [ftUS] Easdng (X) [ftUS] Surface : 2594 FSL 3603 FEL S34 T12N R11E UM 5978317.21 583310.85 L-215PB1 Tgt 1: 3104 FSL 2543 FEL S26 T12N R11E UM 5984180.00 589575.00 TD / BHL : 4617 FSL 658 FEL S26 T12N R11 E UM 5985715.00 591440.00 5tl38J'L.4/ N /0.3525411// W 149.31t34tl56V 584349.46 N 70.35371122 W 149.31505061 584596.56 N 70.35440121 W 149.31303087 585090.76 N 70.35578112 W 149.30897099 585236.11 N 70.35618696 W 149.30777680 585548.61 N 70.35705948 W 149.30520913 58557787 N 70.35714060 W 149.30497039 585577.69 N 70.35714065 W 149.30497027 588035.54 N 70.35841893 W 149.30120792 586641.56 586646.05 N 70.36011072 W 149.29622740 N 70.36012326 W 149.29619048 586703.90 N 70.36027780 W 149.29571526 586773.15 N 70.36044659 W 149.29514695 586824.75 N 70.36056264 W 149.29472375 586852.01 N 70.36082195 W 149.29450029 587606.01 N 70.36226248 W 149.28831819 587708.55 N 70.38248120 W 149.28749383 587932.75 N 70.36297331 W 149.28553897 588171.52 N 70.36349274 W 149.28368096 588309.75 N 70.36379345 W 149.28254733 588385.15 N 70.38395747 W 149.28192897 588510.82 N 70.36423084 W 149.28089838 588762.16 N 70.36477755 W 149.27883704 588938.09 N 70.36518023 W 149.27739405 589101.46 N 70.36551557 W 149.27605409 589277.39 N 70.36589823 W 149.27461100 589362.40 N 70.36608312 W 149.27391370 589372.55 N 70.36610521 W 149.27383043 589447.73 N 70.36626900 W 149.27327372 589473.07 N 70.36632428 W 149.27300593 589524.03 N 70.36643563 W 149.27258788 589575.00 N 70.36654719 W 149.27216972 589601.03 N 70.36660439 W 149.27195618 589623.15 N 70.36665329 W 149.27177469 590183.57 N 70.36789546 W 149.26717633 590185.00 N 70.36789862 W 149.28716463 590186.98 N 70.36790302 W 149.26714834 590844.59 N 70.36935936 W 149.26175191 590845.00 N 70.36936027 W 149.26174853 590845.14 N 70.36936058 W 149.26174736 591440.00 N 70.37067913 W 149.25686511 WeIlDesign Ver SP 1.0 Bld{ doc40x_56) L-2151PIan L-215 (N-T)~Plan L-215P81~L-215PB1 (P8) Genereted 8/14/2005 9:14 PM Page 2 of 2 uN Schlumberger ~" L-215PB1 (P8) `~`~ Prudhoe Bay Unit - WOA STRUCTURE L-PAD :AeWMIC P-enW SuRw L9u09n NeD22 Alnb SMS P4nee. ZoM d. US FM AN.2r~eo0 MoUM: BfiGM 2001 ~: !5.815' Q92 $epY5bf30. ]005 Let Srr0312A20 W9sq: 59)901]11 GIS Grk COm'. •0.!5102199• SMK LI15 TVDRaF RW,y TBW (78.308e5oa M8L1 9Yp Deo •N.308' F5: SM253 nT Lon: Wtap 192x.958 Eae,p. 583510 BSIWS SrJM Felt O.pB890199a Plsi: L213PB10'91 `y.Y ~9E9. wp.: 11, 2005 0 1500 3000 4500 6000 7500 9000 10500 0 1500 O O 3000 N L~ F- 4500 6000 RTE ~ ~. KOP BW 1.SH00 _.._.._.._.. .._.._.. _.._. .._.._.._.._.._.._.._.._.i_._.._.._.._.._.._.._.._..i.. .. _.._.._.._.._.._.._.. .. _.._.._.._.._.. _.._.. _.._.._.._.._.._.._.._. .._.._.._.._.._.._.._.._..._._.._ _.. _.._.. _ _.. Crv 3N00 _ _ _ _ _ _ _ crv uloo crv u100 _.._.._.. _.. _..;. . _.. _.._.. _.. _.. _.._;._.._.._.._.._.._.._.._.._.;_.._.._.._.._.._.._.._.._...;.._.._.._.._.._.._.._.._.._r_.._.._.._.._.._.._.._.._..;..._.._.._.._.._.._.._.._..~.._.._.._.._.._.._.._.. _. Fault 1 End Crv _ ..................i.......... ...__ Crv41100................................. - i i e . .. _.._.._.._.._.._.._.._.._.._ .._ €.._F.FY.._.._.._.._.._.._.._.._.~.._.._.._.._.._.._.._.._..~.._.._.._.._.._.._.._.._.._.:_.._.._.._.._.._.._.._.._..:.._.._.._.._.._.._.._.._..~.._.._.._.._.._.._.._.._.._.._.._.._.._.._ Perm _.._.._.._.._ _.._.._.._.._.._.._.. _. ._.._.._.. _.._.._.. .._.._.._..s.. .._.._.._.._.._.._.._.. .._.._.._.._.._.._.._.. _.._.._.._.._.._.._.._. .._.._.._.._.._.._.._.. ._.._.._.._.. Fwk2 _.._.._.._.._..i.._.._.._.._.._.._.._.._.._i•_.._.._.._.._.. _.. .:_.._.._.._ _.._.. _.._.._..:.._.._.. _. _.._.._.._.._.._.._.._. .._.._.._.._.._.._.._.. ._.._.. _.._.._.. ._.._.._.._.._.._;._.._.._.._.._.._.._.._.._..-.. ..i.._ _.i_. ....s.os ...,..,, ,.,,..,..,.,,.,,.oei,,..,.,,.o.,...,.,,-o-.. ono....o.o.o.......o....i.s....u.........o.,.. .6.0...............o.......'r..........................r.........,..........,.....,i..,.............o.. _.. __.__... _.crvvlar . ^::::ans::s:snsas:unss::::rs::z:a:a:s::a:::::ss:as:uss:::saasusrs:rn:srrrusrsns:uaus:a s.a::a:auxasu: resiesii::e:eizeweiriznseei:a_:iseeseesiisiiseiseiseesei:eiseeseesnsiiseese _.._.._.._.._..r.._.._.._.._.._.._.._.._.._:._.._.._;._.._.._.._.._.._.._.._.._.._.._.._.._.._.._..y.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._. _ _.~_.._.._.._.. _.._.._. _.._.._.._.._..i.. _.._.. _.._.._.._.._ i._.._ ._..~.:_..~.. _.. .. .. .. .. '.: ':: .. .. '.: '..'.. ' ~ crv uloo '' L-Z15PB1 Tpt 1 Crv Q100 End Crv - TD End Crv L-215P81 Tpt 2 End Crv Crv M100 L-215PB1 Tpt 3 0 1500 3000 4500 6000 0 1500 3000 4500 6000 7500 9000 10500 Vertical Section (ft) Azim = 45°, Scale = 1(in):1500(ft) Origin = 0 N/-S, 0 E/-W Schlumberger wE" L-215P61 (P8) F'E`~ Prudhoe Bay Unit - WOA 5~`~TU~ L-PAD Mpealk PMnMUn $VMV lC[Ybn IUDZ2 MW Sbb WaB. Zane W. US FM MeuiWwor MoW: BGGM 21lN Op. 80.815' OaY: StMni8r 20. ]005 Lt NJO 312820 NoilOiiB-. Sw611121 MIS GN Cmm. M.6110218Y Sb: 1315 TVD ReI. Rnfary Ta8ln (28]08 B0U<MSL) My DSC: ~2a.BOB' FS: 518252 nT Lon: wtaB lB 2a.el8 Ean1Yp SB00t0 BS 8U5 SdaFK 09B990188u Wn: L-2t5P01 (ce) Srry ~. AuB~fa, 2005 -1500 0 1500 3000 4500 6000 7500 9000 7500 7500 • n n n Z x 0 0 u'2 c u a~ v v v 6000 4500 3000 1500 0 -1500 0 1500 3000 4500 6000 7500 9000 «< W Scale = 1(in):1500(ft) E »> 6000 4500 3000 1500 0 Plan L-215 (N-'I')/Plan L-215PB 1 _ ----- ---- - ---° - Pim L-2l5PBl ,\ • • Oilfield Services, Alaska Schlumberger Drilling & Measurements • Sc~ueiberger 2525 Gambell, Suite 400 Anchorage, AK 99503 Tel (907) 273-1766 Fax (907) 561-8367 Friday, August 12, 2005 John Rose Prudhoe Bay 1-215P61 (P8) BP Exploration Alaska Nabors 9ES Close Approach Analysis We have examined the potential intersections of subject well with all other potentially conflicting wells, according to the BPA Directional Survey handbook (BPA-D-004) dated 09/99. Method of analysis: 1. A list of wells to be analyzed is created in Compass by performing a global scan with an initial search radius of two thousand feet with an increment of one hundred feet for every one thousand feet of measured depth in the subject well. 2. WeAs are analyzed using the Compass Anti-collision module (BP Company setup) with major risk safety factors applied. For problem wells that are plugged and abandoned or that can be shut in, risk-based safety factor may be used, with client notification. 3. All depths are relative to the planned well profile. Survey Prooram: Instrument Type Start Depth End Depth GYD GC SS 28.50'md 1,000.00'md MWD 1,000.00'md 2,400.00'md MWD + IFR + MS 1,000.00'md 12,886.31'md Close Approach Analysis results: Under method (2), atl wells may flow. All data documenting these procedures is available for inspection at the Drilling & Measurements Directional Planning Center. Close Approach Drillino Aids to be provided: A drilling map and traveling cylinder will be provided. Checked by: Scott DeLapp 08/12/05 Schlumberger Anticollision Report Company: BP Amoco Date: 8/14/2005 Time: 20133:27" Page: 1 Field: r Prudhoe Bay Reference Site: PBt Pad Co-ordinate(NE) Reference: WeIL• PIBn L-215 (N-T), True North Reference Well: Plan L-215 (N-T) Reference Wellpath: Plant 215P81 Vertical (TVD) Reference: L-215 Plan N-T 78.3 Db: Sybase NO GLOBAL SCAN: Using user deTned selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD + Stations Interval: 20.00 ft Error Model: ISCWSA Ellipse Depth Range: 28.50 to 12886.31 ft Scan Method: Trav Cylinder North Maximum Radius: 10000.00 ft Erro r Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 6/21/2005 Validated: No Version: 2 Planned From To Survey Toolcode Tool Name ft ft 28.50 1000.00 Planned: Plan #8 V1 GYD-GC-SS Gyrodata gyro single shots 1000.00 2400.00 Planned: Plan #8 V1 MWD MWD - Standard 1000.00 12886.31 Planned: Pl an #8 V1 MWD+IFR +MS MWD +IFR + Multi Station Casing Points MD TVD: Diameter Hole Size Nsme ft ft in in 4263.18 2708.30 9.625 12.250 9 5/8" 12886.31 4983.30 8.750 8.750 8-3/4" open Summary < Offset Wellpath ~ Reference Offset' Ctr-Ctr No-Go Allowable Site Well Wellpath MD ! 'MD Distaece Area Deviation Warning ft <ft ft ft ft PB L Pad L-01 L-01 V14 320.48 320.00 209.36 5.29 204.07 Pass: Major Risk PB L Pad L-02 L-02 V1 448.86 460.00 264.65 7.90 256.75 Pass: Major Risk PB L Pad L-02 L-02A V5 454.20 460.00 264.73 8.09 256.64 Pass: Major Risk PB L Pad L-02 L-02AP61 V2 454.20 460.00 264.73 8.09 256.64 Pass: Major Risk PB L Pad L-02 L-02PB1 V21 448.86 460.00 264.65 8.01 256.64 Pass: Major Risk PB L Pad L-03 L-03 V5 541.38 560.00 186.78 10.22 176.55 Pass: Major Risk PB L Pad L-101 L-101 V4 524.89 540.00 324.24 9.43 314.81 Pass: Major Risk PB L Pad L-102 L-102 V2 299.29 300.00 190.89 4.80 186.10 Pass: Major Risk PB L Pad L-102 L-102PB7 V10 299.29 300.00 190.89 4.89 186.00 Pass: Major Risk PB L Pad L-102 L-102PB2 V2 299.29 300.00 190.89 4.89 186.00 Pass: Major Risk PB L Pad L-103 L-103 V23 399.66 400.00 15.26 6.71 8.56 Pass: Major Risk PB L Pad L-104 L-104 V7 337.69 340.00 181.81 5.83 175.98 Pass: Major Risk PB L Pad L-105 L-105 V4 356.93 360.00 183.21 6.48 176.73 Pass: Major Risk PB L Pad L-106 L-106 V14 581.12 600.00 174.69 9.79 164.90 Pass: Major Risk PB L Pad L-107 L-107 V14 357.79 360.00 200.56 7.63 192.93 Pass: Major Risk PB L Pad L-108 L-108 V18 469.32 480.00 179.61 8.68 170.93 Pass: Major Risk PB L Pad L-109 L-109 V12 320.62 320.00 250.98 6.66 244.32 Pass: Major Risk PB L Pad L-110 L-110 V11 301.12 300.00 285.45 5.53 279.92 Pass: Major Risk PB L Pad L-111 L-111 V24 282.09 280.00 373.51 5.05 368.47 Pass: Major Risk PB L Pad L-112 L-112 V8 335.17 340.00 282.26 7.06 275.20 Pass: Major Risk PB L Pad L-114 L-114 V15 394.92 400.00 345.76 6.32 339.44 Pass: Major Risk PB L Pad L-114 Plan L-114A V4 Plan: P 394.92 400.00 345.76 6.37 339.39 Pass: Major Risk PB L Pad L-115 L-115 V7 455.15 460.00 203.86 7.74 196.12 Pass: Major Risk PB L Pad L-116 L-116 V10 377.17 380.00 263.16 5.89 257.27 Pass: Major Risk PB L Pad L-117 L-117 V11 399.16 400.00 191.08 6.38 184.70 Pass: Major Risk PB L Pad L-118 L-118 V9 551.91 560.00 170.12 10.34 159.77 Pass: Major Risk PB L Pad L-119 L-119 V9 660.92 660.00 28.11 11.30 16.82 Pass: Major Risk PB L Pad L-120 L-120 V8 299.18 300.00 61.99 5.18 56.81 Pass: Major Risk PB L Pad L-121 L-121 V14 241.88 240.00 310.25 4.40 305.85 Pass: Major Risk PB L Pad L-121 L-121A V1 241.88 240.00 310.25 4.40 305.85 Pass: Major Risk PB L Pad L-122 L-122 V5 340.27 340.00 236.00 5.66 230.34 Pass: Major Risk PB L Pad L-124 L-124 V11 471.96 480.00 293.33 8.25 285.08 Pass: Major Risk PB L Pad L-124 L-124PB1 V5 471.96 480.00 293.33 8.25 285.08 Pass: Major Risk PB L Pad L-124 L-124PB2 V4 471.96 480.00 293.33 8.25 285.08 Pass: Major Risk PB L Pad L-200 L-200 V7 399.39 400.00 106.83 7.08 99.75 Pass: Major Risk PB L Pad L-200 L-200L1 V3 399.39 400.00 106.83 7.08 99.75 Pass: Major Risk PB L Pad L-200 L-200L2 V6 399.39 400.00 106.83 7.08 99.75 Pass: Major Risk PB L Pad L-201 L-201 V6 299.58 300.00 15.16 5.19 9.97 Pass: Major Risk PB L Pad L-201 L-201 L1 V9 299.58 300.00 15.16 5.19 9.97 Pass: Major Risk PB L Pad L-201 L-201 L1P61 V10 299.58 300.00 15.16 5.19 9.97 Pass: Major Risk PB L Pad L-201 L-201 L2 VS 299.58 300.00 15.16 5.19 9.97 Pass: Major Risk PB L Pad L-201 L-201 L3 V2 299.58 300.00 15.16 5.19 9.97 Pass: Major Risk Schlumberger Anticollision Report Company: BP Amoco Date: 8/14!2005 Time: 20:33`.27 Page:: 2 Field: Prudhoe Bay Reference Site: ! PB L'Pad Co-ordinate(NE) Reference: WeIL .Pla n L-215 (N-T), True North Reference Well: Plan L-215 (N-T) Vertical (TVD) Reference: L-215PIan N-T 78.3 Reference Wellpath: Plan L-215P61 Db: Sybas Summary < Offset Wellpath ~ Refereace Offset Ctr-Ctr Nato Allowable Site Well Wellpath MD MD ° Distance Area Deviation Warning ft ft ft ft ft i PB L Pad L-201 L-201L3P61 V6 299.58 300.00 15.16 5.19 9.97 -- _ Pass: Major Risk PB L Pad L-201 L-201 PB1 V12 299.58 300.00 15.16 5.19 9.97 Pass: Major Risk PB L Pad L-201 L-201 PB2 V3 299.58 300.00 15.16 5.19 9.97 Pass: Major Risk PB L Pad L-202 L-202 V5 419.47 420.00 90.24 7.12 83.12 Pass: Major Risk PB L Pad L-210 L-210 V6 239.00 240.00 44.67 4.09 40.79 Pass: Major Risk PB L Pad L-210 L-210PB1 V8 239.00 240.00 44.87 4.09 40.79 Pass: Major Risk PB L Pad L-211 L-211 V6 473.98 480.00 212.86 8.77 204.09 Pass: Major Risk PB L Pad L-211 L-211 P61 V6 473.98 480.00 212.86 8.77 204.09 Pass: Major Risk PB L Pad L-212 L-212 V11 768.43 780.00 64.26 12.78 51.48 Pass: Major Risk PB L Pad L-212 L-212P61 V9 768.31 780.00 64.19 12.95 51.24 Pass: Major Risk PB L Pad L-212 L-212P62 V2 768.81 780.00 64.68 12.88 51.80 Pass: Major Risk PB L Pad L-214 L-214 V9 508.85 520.00 181.32 9.27 172.05 Pass: Major Risk PB L Pad L-216 L-216 V6 618.66 620.00 28.03 10.66 17.37 Pass: Major Risk PB L Pad NWE1-01 L-100 V2 281.28 280.00 434.46 4.94 429.53 Pass: Major Risk PB L Pad NWE1-01 NWE1-01 V5 281.28 280.00 434.46 4.94 429.53 Pass: Major Risk PB L Pad Plan L-123 (S-U) Plan L-123 V4 Plan: Pf 600.48 620.00 183.16 11.45 171.71 Pass: Major Risk PB L Pad Plan L-123 (S-U) Plan L-123PB1 V2 Plan: 600.48 620.00 183.16 11.34 171.82 Pass: Major Risk PB L Pad Plan L-213 (S-B) Plan L-213 V5 Plan: PI 338.36 340.00 185.97 6.40 179.57 Pass: Major Risk PB L Pad Plan L-218 (N-B) Plan L-218 V2 Plan: PI 474.80 480.00 310.13 8.91 301.22 Pass: Major Risk PB L Pad Plan L-250 (NM-15) Plan L-250 V1 Plan: PI 418.75 420.00 121.07 7.90 113.17 Pass: Major Risk PB L Pad Plan L-250 (NM-15) Plan L-250L1 V5 Plan: 418.75 420.00 121.07 7.90 113.17 Pass: Major Risk PB L Pad Plan L-50 (S-D) Plan L-50 V2 Plan: Pla 376.39 380.00 334.07 7.12 326.96 Pass: Major Risk Field: Prudhoe Bay Site: PB L Pad Well: Plan L-215 (N-T) Wellpath: Plan L-215PB1 • Target: L-215PB1 Poly Site: PB L Pad Well: Plan L-215 (N-T) Drilling Tazget Conf.: 90% Based on: Planned Progrun Description: Vertical Depth: 4760.00 ft below Mean Sea Level Map Northing: 5984180.00 ft Local +N/-S: 5793.32 ft Map Easting : 589575.00 ft Local +E/-W: 6329.53 ft Latitude: 70°21'S9.570N Longitude: 149° 16'19.811 W Polygon X ft Y ft Map E ft Map N ft 1 98.89 -101.11 589675.00 5984080.00 2 -98.89 10].11 589475.00 5984280.00 3 1783.23 1615.42 591340.00 5985815.00 4 1981.02 1413.19 591540.00 5985615.00 • o~ . ~ ~ 0 0 0 0 0 0 0 o c 0 0 0 0 0 0 0 o c o- cv to o~ - ~- r- o c ~ n r- r- r- m cx~ m cr- c ICUU 6900 6600 6300 6000 500 5+00 5100 N w by L-215 (P61 P Report Date: August 14, 2005 CIIeM: BP Explore8on Alaska FmM: Prudhoe Bay Unit- WOA 0~~~ Structure I SbC L-PAD / L-215 ~~ Wetl: Plan L-215 (N-T) A~~~ Borehole: Plan L-215 UWVAPM: 50029 Survey Name I Dam: L-215 (P6) I August 14, 2005 Tort 1 AHD 1 DDI I ERD ratio: 78.335° 17007.32 R 16.00411.427 Gdd CooMinam System: NAD27 Alaska State Planes, Zone 04, US Feet Location LatlLong: N 70.35072769, W 149.32359328 Locetlon Gdd NIE YO(: N 5978317.210 ftUS, E 583310.850 ftUS Grid Comargence Angle: +p.63702199° a~ Schlumperger Survey I DLS Computatlon Method: Minimum Curvature / Lubinski W Vertlcal8ectlon Atlmudu 45.000° Vertlcel Section Odgin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Remrerrce Elevatmn: 78.30 ft relative to MSL Sea Bed I Ground level Elevatlon: 49.80 ft rela0ve to MSL Magnetle Declination: 24.306° Toml Flald Strength: 57625.182 nT Magnetic Dtp: 80.815° Dadinatlon Dam: September 20, 2005 Magnetlc DaUlnatlon MadN: BGGM 2004 North Reference: True North Toml Corr Meg North a True North: +24.308° Commenb Measured Inelinatlon Azimuth Sub~Sea TVD TVD Vertkal Along Hom NS EYV DLS Tod Face Build flats Walk Rate Northing Easting Latitude Longitude Depth Secton Departure R R R R R R R d OOR d OOR 100ft RUS ftU3 Ile-Ip nvr oO lV.eo 04/[ 44.00 JOVV.W JO/6.JV 4818.18 40LL.88 3438.80 JJ/J.8/ J.88 -au.nu J.1Z [./J DBtlI/84.14 DCC)646.UD N /U.J6U1ZJZt5 W 148.Z8t378U4tf 6600.00 64.72 44.19 3638.03 3716.33 4898.69 4903.40 3497.45 3430.34 0.50 -90.50G -0.01 -0.55 5981852.25 586701.77 N 70.36028025 W 149.29573246 6700.00 64.71 43.63 3680.74 3759.04 4989.09 4993.81 3562.59 3493.05 0.50 -90.26G 0.00 -0.55 5981918.08 586763.75 N 70.36045813 W 149.29522290 UG1 6756.78 64.71 43.32 3705.00 3783.30 5040.41 5045.16 3599.85 3528.37 0.50 -90.13G 0.00 -0.55 5981955.72 586798.65 N 70.36055988 W 149.29493584 6800.00 64.71 43.08 3723.46 3801.76 5079.47 5084.23 3628.33 3555.12 0.50 -90.03G 0.00 -0.55 5981984.50 586825.08 N 70.36063764 W 149.29471847 6900.00 64.71 42.53 3766.18 3844.48 5169.82 5174.65 3694.67 3616.56 0.50 -89.79G 0.00 -0.55 5982051.51 586885.77 N 70.36081878 W 149.29421920 6944.78 64.71 42.28 3785.31 3863.61 5210.26 5215.13 3724.56 3643.86 0.50 O.OOG 0.00 -0.55 5982081.70 586912.74 N 70.36090042 W 149.29399733 Ma 7388.85 64.71 42.28 3975.00 4053.30 5611.34 5616.66 4021.63 3914.00 0.00 O.OOG 0.00 0.00 5982381.72 587179.53 N 70.36171161 W 149.29180201 M61 7482.50 64.71 42.28 4015.00 4093.30 5695.91 5701.33 4084.27 3970.96 0.00 O.OOG 0.00 0.00 5982444.99 587235.79 N 70.36188266 W 149.29133907 Mb2 7669.78 64.71 42.28 4095.00 4173.30 5865.06 5870.66 4209.56 4084.88 0.00 O.OOG 0.00 0.00 5982571.52 587348.30 N 70.36222475 W 149.29041316 Drp 4/100 7836.34 64.71 42.28 4166.15 4244.45 6015.49 6021.26 4320.98 4186.20 0.00 -178.81G 0.00 0.00 5982684.05 587448.36 N 70.36252900 W 149.28958967 Mc 7879.13 63.00 42.24 4185.00 4263.30 6053.85 6059.67 4349.40 4212.03 4.00 -178.79G -4.00 -0.09 5982712.76 587473.87 N 70.36260661 W 149.28937973 7900.00 62.17 42.22 4194.61 4272.91 6072.36 6078.20 4363.12 4224.49 4.00 -178.78G -4.00 -0.10 5982726.62 587486.17 N 70.36264407 W 149.28927851 Na 7982.10 58.88 42.14 4235.00 4313.30 6143.73 6149.66 4416.08 4272.47 4.00 -178.74G -4.00 -0.10 5982780.10 587533.56 N 70.36278866 W 149.28888850 8000.00 58.17 42.12 4244.35 4322.65 6158.98 6164.93 4427.40 4282.71 4.00 -178.73G -4.00 -0.10 5982791.53 587543.68 N 70.36281958 W 149.28880525 L-215 Nb Tgt 8029.20 57.00 42.09 4260.00 4338.30 6183.60 6189.58 4445.69 4299.24 4.00 O.OOG -4.00 -0.11 5982810.00 587560.00 N 70.36286952 W 149.28867091 Nb 8029.22 57.00 42.09 4260.01 4338.31 6183.62 6189.60 4445.70 4299.25 4.00 -180.000 -4.00 -0.01 5982810.01 587560.01 N 70.36286955 W 149.28867083 End Crv 8082.01 54.89 42.09 4289.57 4367.87 6227.29 6233.33 4478.16 4328.56 4.00 O.OOG -4.00 -0.01 5982842.79 587588.96 N 70.36295817 W 149.28843256 Nc 8100.14 54.89 42.09 4300.00 4378.30 6242.10 6248.16 4489.16 4338.50 0.00 O.DOG 0.00 0.00 5982853.90 587598.77 N 70.36298822 W 149.28835177 OA 8256.61 54.89 42.09 4390.00 4468.30 6369.94 6376.16 4584.16 4424.29 0.00 O.OtHi 0.00 0.00 5982949.84 587683.49 N 70.36324760 W 149.28765446 OBa 8369.62 54.89 42.09 4455.00 4533.30 6462.26 6468.60 4652.76 4486.25 0.00 O.OOG 0.00 0.00 5983019.12 587744.68 N 70.36343492 W 149.28715083 OBb 8465.24 54.89 42.09 4510.00 4588.30 6540.38 6546.82 4710.82 4538.68 0.00 O.OOG 0.00 0.00 5983077.75 587796.45 N 70.36359343 W 149.28672468 OBc 8560.86 54.89 42.09 4565.00 4643.30 6618.50 6625.04 4768.87 4591.10 0.00 D.OOG 0.00 0.00 5983136.37 587848.22 N 70.36375193 W 149.28629852 Target 8656.48 54.89 42.09 4620.00 4698.30 6696.62 6703.26 4826.92 4643.53 0.00 O.OOG 0.00 0.00 5983195.00 587900.00 N 70.36391044 W 149.28587236 OBd 8656.50 54.89 42.09 4620.01 4698.31 6696.63 6703.28 4826.93 4643.54 0.00 O.OOG 0.00 0.00 5983195.01 587900.01 N 70.36391047 W 149.28587228 8778.18 54.89 42.09 4690.00 4768.30 6796.04 6802.82 4900.80 4710.25 0.00 O.OOG 0.00 0.00 5983269.61 587965.89 N 70.36411217 W 149.28532996 OBe 8778.20 54.89 4209 4690.01 4768.31 6796.06 6802.83 4900.81 4710.26 0.00 O.OOG 0.00 0.00 5983289.62 587965.90 N 70.36411220 W 149.28532988 OBf 8847.73 54.89 42.09 4730.00 4808.30 6852.86 6859.71 4943.02 4748.38 0.00 O.OOG 0.00 0.00 5983312.25 588003.54 N 70.36422744 W 149.28502001 OBf Base 8925.98 54.89 42.09 4775.00 4853.30 6916.77 6923.70 4990.52 4791.28 0.00 0.000 0.00 0.00 5983360.22 588045.90 N 70.36435712 W 149.28467131 lr .J WeIlDesign Ver SP 1.0 Bld(doc40x_56) L-215\Plan L-215 (N-T)\Plan L-215\L-215 (P6) Generated 8/14/2005 9:21 PM Page 1 of 2 Comments ~u~ lncilnation Azimuth SubSeaND ND Vertical Along HoN ~ EVA DLS Tool Face Bulld Rate Walk Rate Northing Fasting Lagtuda Longitude Dspth Sectlon Departure tt d ft ft ft ft tt ft d 100 ft d d 100 ft 100 ft ftU3 ftUS IV t t Vtiy rl YVCO.~o ow.oa 4G.V~ 4oJJ.oV 4y ~G.lu rWV.GPI IW LJG OVOLAO 4o4/AL V.VV V.VVU V.VV V.UV Ob834LC.8`J 0881U-I .LD rv /U.J04JYOD0 W 148.Zt14Ylb/7 Baal Descrlotlon: Surface : 2594 FSL 3603 FEL S34 T12N R11 E UM L-215 Nb Tgt : 1758 FSL 4575 FEL S26 T12N R11E UM Obd Tgt : 2139 FSL 4230 FEL S26 T12N R11 E UM BHL : 2365 FSL 4026 FEL S26 T12N R11E UM Northing (Y) [ftUS] 5978317.21 5982810.00 5983195.00 5983422.89 Fasting (X) [ftUS) 583310.85 587560.00 587900.00 588101.25 • WeIlDesign Ver SP 1.0 Bld( doc40x_56) 1-215\Plan L-215 (N-T)\Plan L-215\L-215 (P6) Generated 8/14/2005 9:21 PM Page 2 of 2 ..r, Schlumberger WE" L-215 (P6) `~E`~ Prudhoe Bay Unit - WOA s,~„cTU~ L-PAD w,9~c r..n.l.. s.e.n Ina6m raven ur, sla. Arw. i°n° a. us Feel nacren.o,. re9°e: eccm z0ol u°: eaels• oe.. sevr,~e.. z6. zoos tY rpo zl zezo wn.q: s9Tai1~zl nus raa cm.- w.mrozl99• sw: L-z15 rw~ rmurl rave peso n.ew. rasa Mp D1° ~2~306' Fe: erBi53 nT la: W1091930.908 E+MYg. 5&V 1085 M/6 SaI0 FMn0.9999019610 Plan. L315 Ref ~'Y DYO AvpuM 10.20D5 3600 4000 0 0 v c _d c~ ~ 4400 O 4800 4400 4800 5200 5600 6000 6400 6800 7200 7600 i0 i0 ~0 cam) ~p • • 4400 4800 5200 5600 6000 6400 6800 7200 7600 Vertical Section (ft) Azim = 45°, Scale = 1(in):400(ft) Origin = 0 N/-S, 0 lJ-W ~~ Schlumberger W"` L-215 (P6) `~`~ Prudhoe Bay Unit - WOA 5~R1C1"~ L-PAD Ma9na5t Panmebra S Wear Lou0on NPD2) Alaska Slala Pb~s, l M. US FaM Mlollareoua MotlN: BGGM 2(101 09: 00.915' Cake: Seq-n0-30.3005 Let N)02t 2820 NoTYq. 5918]1)11808 GilO Cary: ~0.80i03199' Sbf: 1215 iW Rat. Rarely iapg (/8.Op 8e0o.~M5t1 Meg Oea ~2d.9118' F8: 518353 nT Lm: W1d9193d BOB Faean9. SBOOt0.B5 BUS SWSfan. 0.99990]BBN Ran: L-3151P8) Srvt Pe11: Aupug td, 3005 2800 5200 4800 n n n Z ~ 4400 0 0 v c m U ~ 4000 v v v 3600 3200 3600 4000 4400 4800 5200 10 (PB) 10 ip i0 i0 • 2800 3200 3600 4000 4400 4800 5200 «< ~/ Scale = 1(in):400(ft) E »> Plan L-215 (N-T)/Plan L-215 • ~~.~ ~o 0 0 ~~ - %, ~~ - --- Plan L-215 (N-1) (Plan L-2l5PBl~ Plan L-215 Schlumberger Anticollision Report Company; BP Amoco Date: 8/14/2005 Time: 21;35:53 Page: 1 ~ Field: Prudhoe Bay- Reference Site: PB L Pad Co-ordinate(NE) Reference: WeIL' Plan L-215 (N-T), True North ..Reference Well:' Plarr L-215 (N-T) Vertical (1'VD) Reference: L-215 Pian N-T 78.3 ~ Reference Wellpath: Plan L-215 Db: Sybase ~ NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD + Stations Interval: 20.00 ft Error Model: ISCWSA Ellipse Depth Range: 6510.00 to 9028.18 ft Scan Method: Trav Cylinder North Maximum Radius: 10000.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 8/14/2005 Validated: No Version: 5 Planned From To Survey Toolcode Tool Name ft ft 28.50 1000.00 Planned: Plan #8 V1 (0) GYD-GC-SS Gyrodata gyro single shots 1000.00 6510.96 Planned: Plan #8 V1 (0) MWD+IFR+MS MWD +IFR + Multi Station 6510.96 9028.18 Planned: Plan #6 V1 MWD+IFR+MS MWD +IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in , _ in 4263.18 2708.30 9.625 12.250 9 5/8" 9028.18 4912.09 7.000 8.750 7" Summary < Offset Wellpath ~ Reference Offset Ctr-Ctr No-Go Allowable Site Wetl Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB L Pad L-01 L-01 V14 Out of range PB L Pad L-02 L-02 V1 Out of range PB L Pad L-02 L-02A V5 Out of range PB L Pad L-02 L-02AP61 V2 Out of range PB L Pad L-02 L-02PB1 V21 Out of range PB L Pad L-03 L-03 V5 6510.65 10420.00 6900.08 181.57 6718.52 Pass: Major Risk PB L Pad L-101 L-101 V4 Out of range PB L Pad L-102 L-102 V2 6510.95 8120.00 4398.44 201.92 4196.53 Pass: Major Risk PB L Pad L-102 L-102PB1 V10 Out of range PB L Pad L-102 L-102P62 V2 Out of range PB L Pad L-103 L-103 V23 6512.74 8320.00 4004.52 163.39 3841.14 Pass: Major Risk PB L Pad L-104 L-104 V7 6510.95 9560.00 6109.86 196.65 5913.21 Pass: Major Risk PB L Pad L-105 L-105 V4 Out of range PB L Pad L-106 L-106 V14 Out of range PB L Pad L-107 L-107 V14 Out of range PB L Pad L-108 L-108 V18 Out of range PB L Pad L-109 L-109 V12 Out of range PB L Pad L-110 L-110 V11 Out of range PB L Pad L-111 L-111 V24 Out of range PB L Pad L-112 L-112 V8 Out of range PB L Pad L-114 L-114 V15 Out of range PB L Pad L-114 Plan L-114A V4 Plan: P Out of range PB L Pad L-115 L-115 V7 Out of range PB L Pad L-116 L-116 V10 Out of range PB L Pad L-117 L-117 V11 6513.10 8540.00 4424.98 146.43 4278.55 Pass: Major Risk PB L Pad L-118 L-118 V9 6511.02 7200.00 2223.72 140.16 2083.56 Pass: Major Risk PB L Pad L-119 L-119 V9 6526.70 6940.00 1440.10 89.65 1350.45 Pass: Major Risk PB L Pad L-120 L-120 V8 6521.37 7160.00 2404.11 160.00 2244.11 Pass: Major Risk PB L Pad L-121 L-121 V14 Out of range PB L Pad L-121 L-121A V1 Out of range PB L Pad L-122 L-122 V5 Out of range PB L Pad L-124 L-124 V11 Out of range PB L Pad L-124 L-124P61 V5 Out of range PB L Pad L-124 L-124PB2 V4 Out of range PB L Pad L-200 L-200 V7 Out of range PB L Pad L-200 L-200L1 V3 Out of range PB L Pad L-200 L-200L2 V6 Out of range PB L Pad L-201 L-201 V6 6510.74 9040.00 2466.45 168.27 2298.18 Pass: Major Risk PB L Pad L-201 L-201L1 V9 6511.17 9400.00 2760.90 171.56 2589.33 Pass: Major Risk PB L Pad L-201 L-201 L1P61 V10 6511.17 9400.00 2760.90 171.56 2589.34 Pass: Major Risk PB L Pad L-201 L-201 L2 V5 6512.40 9680.00 3018.85 173.98 2844.87 Pass: Major Risk PB L Pad L-201 L-201 L3 V2 Out of range Schlumberger Anticollision Report Company: BP Amoco Date: 8/14/2005 Time: 21:35:53'' Page: 2 Field: Prudhoe Bay Reference8ite: PB l Pad Co-ordtnate(NE) Reference: WeIL• Plan L-215 (N-T), True North Reference Well: Plan L=215 (N-T) Vertical (TVD) Reference: ' L-215' Plan N-T 78.3 Reference Wellpath: Plan. L-215 Db: Sybase Summary Offset Wellpath'- ---% Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning - ft ft ft ft ft . PB L Pad - -_ L-201 L-201L3PB1 V6 __ ~__ f _ Out of range PB L Pad L-201 L-201 P61 V12 Out of range PB L Pad L-201 L-201 P62 V3 6510.74 9040.00 2466.45 168.27 2298.18 Pass: Major Risk PB L Pad L-202 L-202 V5 6991.24 8580.00 848.63 117.08 731.55 Pass: Major Risk PB L Pad L-202 L-202L1 V7 6873.50 8480.00 748.44 105.06 643.38 Pass: Major Risk PB L Pad L-202 L-202L2 V6 6887.18 8460.00 703.57 101.90 601.67 Pass: Major Risk PB L Pad L-202 L-202L3 V6 6793.04 8420.00 695.40 104.26 591.14 Pass: Major Risk PB L Pad L-210 L-210 V6 6510.64 7380.00 3304.17 196.85 3107.33 Pass: Major Risk PB L Pad L-210 L-210P61 V8 6513.10 7280.00 2999.52 205.06 2794.47 Pass: Major Risk PB L Pad L-211 L-211 V6 Out of range PB L Pad L-211 L-211 PB1 V6 Out of range PB L Pad L-212 L-212 V11 6512.57 8080.00 4080.67 176.05 3904.62 Pass: Major Risk PB L Pad L-212 L-212PB1 V9 Out of range PB L Pad L-212 L-212P62 Study V3 6516.59 9520.00 6199.14 192.96 6006.18 Pass: Major Risk PB L Pad L-212 L-212PB2 V2 6526.77 9500.00 6207.06 193.29 6013.77 Pass: Major Risk PB L Pad L-214 L-214 V9 Out of range PB L Pad L-216 L-216 V6 6520.08 6720.00 1363.67 171.09 1192.59 Pass: Major Risk PB L Pad NWE1-01 L-100 V2 Out of range PB L Pad NWE1-01 NWE1-01 V5 Out of range PB L Pad Plan L-123 (S-U) Plan L-123 V4 Plan: PI 16472.45 7380.00 2980.53 348.32 2632.21 Pass: Major Risk PB L Pad Plan L-123 (S-U) Plan L-123P61 V2 Plan: 16472.45 7380.00 2980.53 348.45 2632.08 Pass: Major Risk PB L Pad Plan L-213 (S-B) Plan L-213 V5 Plan: PI Out of range PB L Pad Plan L-215 (N-T) Plan L-215PB1 V2 Plan: 6540.00 6540.00 0.32 162.43 -162.11 FAIL: Major Risk PB L Pad Plan L-218 (N-B) Plan L-218 V2 Plan: PI Out of range PB L Pad Plan L-250 (NM-15) Plan L-250 V1 Plan: PI 6742.68 8600.00 617.27 127.39 489.88 Pass: Major Risk PB L Pad Plan L-250 (NM-15) Plan L-250L1 V5 Plan: 6519.46 7740.00 2540.04 182.95 2357.08 Pass: Major Risk PB L Pad Plan L-50 (S-D) Plan L-50 V2 Plan: Pla Out of range Field: Prudhoe Bay Site: PB L Pad Well: Plan L-215 (N-T) Wellpath: Plan L-215 nm ~~, X50 inu Trevclling Cylinder Azimuth (TFO+AZp [deg] vs Centre to Centre Separation [SONin] Site: PB L Pad Drilling Target Conf.: 95% Description: Map Northing: 5982810.00 ft Map Easting :587560.00 ft Latitude: 70°21'46.330N Shape: Circle Target: L-215 Nb Tgt Well: Plan L-215 (N-T) Based on: Planned Program Vertical Depth: 4260.00 ft below Mean Sea Level Local +N/-S: 4445.68 ft Local +E/-W: 4299.23 ft Longitude: 149° 17' 19.215 W Radius: 150 ft 4-800 ~+~00 ~60o N 4500 4400 X300 x+200 0 0 0 0 00 0 0 O D ~~ ~ ~ ~ ~ ~ 0 ~ ~ Site: PB L Pad Drilling Target Conf.: 95% Description: Map Northing: 5983195.00 ft Map Easting :587900.00 ft Latitude: 70°21'S0.078N Shape: Circle Target: L-215 OBd Tgt 0 0 0 0 0 0 0 0 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Well: Plan L-215 (N-T) Based on: Planned Program Vertical Depth: 4620.00 ft below Mean Sea Level Local +N/-S: 4826.91 ft Local +E/-W: 4643.53 ft Longitude: 149° l7'09.140W Radius: I50 ft 5200 5100 5000 x+900 4-800 ~+~00 N 4-600 0 0 0 ~! L-2151 PB1 Pilot Hole Proposed P&A I TREE: FMC 4-1/16" 5M WELLHEAD: FMC Gen 5 System 11", 5M csg.head w/ 7" mandrel hanger & packoff 11 " x 11 ", 5 M, tbg spool w/ Cellar Elevation = 49.3 11" x 4-1/2" tubing hanger Nabors 9ES RKB = 77 11 " X 4-1 /16" Adaptor Flange 20" X 34" 215.5 Ib/ft, A53 ERW Insulated 108' M D 9-5/8", 40 #/ft, L-80, BTC 4264` MD 8 3/4", Lowside KOP (Injector Mainbore) 6511 ` MD Top of Cement Abandonment Plug (500' above top Ma Sand) / 7305` MD ` ~ t ~ t ~ ~ e $ Top Schrader Ma Sand ,4 ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~ ~ ~ ~ 7805` MD ~ ~ ~ ~ ~ ~ '' ~ t ~ ~ ~ ~ t-- "~ i e ~ t ~ ~ ~ ~ ~ ~ ~ ° ~ b ~ ~ 5 - 1113` Cement Plugs O l °s ~ 1 1 1~ `~- ~ ~ ~ 1 t ~ ~ ~ Top Schrader OASand ~~ ~ t ~ ~ ~ ~ ~ 0 3 ~ ~, ~ ~ ~ TopOf3dSand ~ ~ ~ ~ ,`._--__~._.~~.~_~°~I`~---~-~~,__~...__ .~ ~- _ _ ~~~~~~_~~~~~~t~~~~~~~~~~~ 8 3/4", TD (PB1 Pilot Hole) Date Rev By Comments 08/11/05 John Pilot Hole Proposed Abandonment Rose Revisions reflect final well plan and as built 12,887` MD r '~ ,~:.. , WELL: L-2151 TREE: FMC 4-1/16° 5M L-215i Proposed Completion WELLHEAD: FMC Oen S System 11", SM csg.head w/ 7" mandrel hanger $ packoff Ce1larEleva0on=53.1' 11" x 11", 5M, tbg spool w/ Nabors 9ES RKB = 81.6 11" x 4-1 /2" tubing hanger Max evlation 4 11" X 4-1/16" Adaptor Flange 108' 20" X 34" 215.5 IblR, A53 ERW Insulated 4000' 4-112" 'X' Landing Nipple with 3.813" seal bore. 9-6/8', 40 #/R, L-80, BTC 4-1/2", 12.6 Ib/ft, L-80, TCII 4264` Drift / ID : 3.833"/3.958" 3-1/2", 9.3 Ib/ft, LSO, TCII Drift / ID : 2.867"/2.992" 7301 ` Camco gas Ifft mandrel 4-1/2" x 1" KBG2 w/ DCK Shear Valve pinned to 2,600 7410` 4-112" 'X' Landing Nipple with 3.813" seal bore. 7430` 7" x 4-1/2" Baker 'PRM' Production Packer 7" Short Joint & RA Tag 4-1/2" X 3-1/2" TCII XO - 7499'. Nb Perfs 8030' Camco 3-1/2" x 1-112" MMG-W GLM - 7510'. 7" Short Joint & RA RA Tag in Date Rev 08/09/05 JGR Camco 3-1 /2" x 1-1/2" MMG-W GLM - 8159'. 3-1 /2" `X' Landing Nipple with 2.813" seal bore - 8188`. 8208` 7" x 3-1/2" Baker `PRM' Production Packer 3-1/2" x 1-1/2" MMG-W GLM - 8234` 8 8295'. OA 3-1/2" 'X' Landing Nipple with 2.813" seal bore - 8323'. 8344` 7" x 3-1/2" Baker `PRM' Production Packer OBa 8370` Camco 3-1/2" x 1-1/2" MMG-W GLM - 8370' 8 8492'. OBb 8465` 3-112" `X' Landing Nipple with 2.813" seal bore - 8521 `. 7" x 3-1/2" Baker `PRM' Production Packer - 8542'. OBc 8561` OBd 8660 ` 3-1/2"'X' Landing Nipple with 2.813" seal bore - 8578' (w/RHC-M Plug) 8 8598'. 3-1 /2" WireLine Entry Guide - 8619` 8929` 7", PBTD 9029` 7", 26 #/ft, L80, BTC-Mod 8 3/4", TD (Injector Mainbore) Comments Proposed Completion L-21 51 Est Perf D e the - 5 Intervals Zone To MD Base MD Feet Nb 8030' 8075' 45' OA 8257' 8317' 80' OBa 8370' 8420' S0' OBb 8485' 8490' 25' OBc not erf'ed na na OBd 8880' 8735' 75 ~P.reaferrdfn~.8a~ WELL: L-2151 ~ PLANT - N~15'00'00" ~_ - t ~. GRID __ L-111 i ^ L-114 ^ L-SD ^ L-,2, ^ L-110 ^ L-SI ^ L-116 ^ L-109 ^ ! L-SL ^ L-O1 ^ L-107 ^ L-03 ^ g0° ~ L-2131 ^ 3g L-1081 ^ e L-105i ^ `; L-106 a L-1231 L-104 S-W ^ L-102 ^ Yt ~m F O r r ......... .... . ,~ LEGEND _.,... ...,, L-PAD ^ N-L (NWE-1) ^ N-A (NWE-2) ^ L-113 ^ L-124 ^ L-1121 ^ L-o2 ^ L-122 ^ L-211 i ^ L-115i ~ L-117 ^ L-118 ^ L-zoo ^ L-202 L-212i L-SPARE L-203 L-2161 L-1031 L- 2151 L-201 ^ L-119i ^ L-2101 ^ L--1zo NOTES 1. DATE OF SURVEY: AUGUST 26 & 27, 2004. 2. REFERENCE FIELD BOOK: W004-11 PAGES 54-59. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODEl1C POSITIONS ARE NAD 27. 4. BASIS OF HORIZONTAL LOCATION IS L-PAD OPERATOR MONUMENTATION. 5. BASIS OF ELEVATION IS L-PAD OPERATOR MONUMENTS. ELEVAl10NS ARE BP MSL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION N0. COORDINATES COORDINATES POSITION DMS POSITION D.DD BOX ELEV. OFFSETS Y= 5,978,146.73 N= 9,819.88 70'21'00.936" 70.3502600' 501• 2,423' FSL L-1231 X= 583,371.74 E= 5,339.90 -149'19'23.212" -149.3231144' 3,544' FEL Y= 5,978,305.51 N= 10,000.30 70'21'02.509" 70.3506969' 49 9 2,583' FSL L-203 X= 583,267.30 E= 5,280.11 -149'19'26.212" -149.3239478' ' 3,647' FEL Y= 5,978,317.21 N= 10,000.33 70'21'02.620" 70.3507278' 49 8> 2,594' FSL L-215i X= 583,310.85 E= 5,325.21 -149'19'24.936" -149.3235933' 3,603' FEL Y= 5,978,301.34 N= 10,000.09 70'21'02.470" 70.3506861' 49 6 2,579' FSL L-SPARE X= 583,252.54 E= 5,264.77 -149'19'26.645" -149.3240681' ' 3,662' FEL r. xooerl """"" JACOes h II ICI 1I ~,.. CHECKED:ALLISON u~ O I ~ DA~~ 8/29 04 U DRAWING GPB WOA L-PAD SHEET: FR804 WOL 06-00 `~ y~(~ ~j JOB NO: ®141n~~Ol~o AS-BUILT CONDUCTORS 0 8 29 04 ISSUED FOR INFORMATION ~ RFA n¢ns o wa wmc.ans SCALE: 1 OF 1 NO. DATE REVISION 9r aiK ~,'~s` "`""`° '""` 1"= 150' WELLS L-123i, 203, 2151 & SPARE I 34 > i _u ~- ~N L-PAD ~ ; PROJECT "~° AREA T12N T11 N -~- w f :~„~ li 3, ~ 2 ~f g ; ~~``-~ , f Ali VICIN{TY MAP N.T.S. ~P~~ e0F a q~~ b ~~`49 T" ~ ~9~ <ooooooovoooooooooaooooovoaoo soo>oooooaoaoveeeso ~ ~, Richard F. Allison '~ c~s~~o 10608 ,~~~ '~`ESS I ONA~ ~'~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING iN THE STATE OF ALASKP. AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE ~ CORRECT AS OF AUGUST 26, 2004. TERRIE L RUBBLE ss-sir252 218 BP EXPLORATION AK INC "Mastercard Check" PO BOX 196612 M6 7-5 ~~~°oS ANCHORAGE; AK 99519-6612 oArE PAY TO THE $. ' ~, ~' ORDER OF ~ - First Nationa Bank Alaska Anchorage, AK 99501: ~ /f MEMOl ~~ (~~/~ ~:i25200060~:99~4~~~6227~~~L556i~'- 02L8 `~ •~ • • • • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LE/ TTER WELL NAME l ~ Gi ` Z / `~ PTD# ~Z d ~ ~~z ~ CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (p>~ records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/SO) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C\jody\transmittal_checklist ~_ WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL -640135 Well Name: PRUDHOE BAY UN ORIN L-215i Program SER Well bore seg ^ PTD#:2051270 Company BP EXPLORATION {ALASKA~INC Initial ClasslType SER I WAGIN GeoArea Unit On1Off Shore On Annular Disposal ^ Administration 1 Permitfeeattached___________________---_-__ __--____ ____ __Yes_ ,___-______.-_____--____--.-____-___ 2 Lease number appropriate______ __________________________ _-___--Yes_ ___-______-_- 3 Uni-quewell_nameandnumber-__--__________.-__--______ __,-_._Yes_ __--------------- 4 Well located in a-defined pool- Yes - - 5 Well located proper distance from drilling unit_boundary_ _ _ _ . Yea _ _ - - - 6 Well locatedproperdistancefromotherwells_______--.______-_-. __-_-.-Yes_ _________.___ 7 Sufficient acreageayailablein_drillinqunit________________________ ______Yes- ______-________ 8 If_deyiated, is_wellborep/at-included .. - - - - -Yes - - - - - - - - - 9 Ope[ator only affected party - Yes - - - - - - - - - 10 Ope[ato[hasappropriate-bondinforce---- --- -- ------ --- Yes- ----- - --- --- --------- -- ----- - - ----- - - 11 Permit can be issued without conservation order Yes Appr Date 12 Permit-can be issued withoutadministrativ_e_appr_oval__--_____-_____ _-_--___Yes__ ____________________________________-___________-----_____-_____---_--- RPC 8/22!2005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized by Injection 0-rdet # (put_ 10# in-comments)-(Fpr_ Yes _ . - - - _ sip 24 _ _ _ _ - _ . 15 All wells within1l4_mileareaofreyiewidentified(Forservicewellonly)_______ ________Yes__ .__-_none__________--__-_________--__.__--_____ 16 Pre-produced injector: duration of pre production less than 3 months_(For_service well only) - _ NA_ _ - - - -- - - - 17 ACMP-Finding of Consist_ency_h_as been issued_for this project_ _ - - NA_ _ - - - - - - Engineering 18 Conducts[string_provided____.____--_________ ___--__Yes_ -______.____ - - - - 19 Surface casing-prQtectsall_known-USI)W& - - - Yes - - 20 CMT-vol-adequate_tocirculate_onconductor_&surf-csg______ _________ ________Yes__ ____-Adequate excess,_____--____________--__-__--______._ 21 CMT_voladequate_totie-inlgngstringtosurfcsg___________________ ________ No__- _______.-____________--_ - - - -- 22 CMT_willcoyerallknow_npro_ductiyghorizons_________ ____________ __ _____Yes__ ___-._ - - - - - -- 23 Casing designs adequate forC,TB&_permafrost------------------- - _--Yes-- -----------.--------------------------------------- ------------- ----- 24 Adequatetankageorreseryepit_-_---______________________ ______Yes- _____Nabors_9E$,__.________,-_____--_____________-____ 25 Ifa_re~rill,has-a_10-403forabandonmentbeen approved______________ ____--_ NA___ _-_-_Newwell,_______--_-_____- 26 Adequatewellboreseparationpropgsed_________________________ ________Yes_. .______.-__-__________.__-__.. ------------------------------------------ 27 Ifdiverterrequired,doesitmeetregulations_______________________ ________Yes__ ____--_____-_______.,_____-___-____-_____.-_____--_____-._ --------------- Appr Date 28 Drillingfluid_programschematic&equiplistadequate____-.-_-------- ----- --Yes__ ___-Max MW 9.5ppg.__-,___--____-____-_____--_____._---_-____------ WGA 8!23/2005 29 BOPES, do they meet_regulation - - - Yes - - - - - - - - - - 30 BOPS.pressratingappropriate;testto_(pu_tpsigincomments)___________ ________Yes_ -___-Test to 4000psi._MSP1648psi.______-______-___________-__-___._ 31 Choke-manifold complies wlAPl_RP-53(M_ay84)____________________ ________Yes__ ____-_____.-______-,______-___ 32 Work willoccurwithoutoperationshutdown_____--______._____-- __-____Yes__ _________________________________--___---_____-______--_____--__ --_-- 33 Is presence_of H2S gas-probable- - - N0 Not an H2S pad. - - - - - - - - - - 34 Mechanicalcond_itionofwellsWithinAORyerified~Forservicewellonly)______ ________Yes-_ _-___Ngwells within AOR.___.---.___-_______--__________-__--_________-_------ Geology 35 Permit_canbeissuedw/ohyd[ogen_sul_fidemeasures_________________ ________Yes__ -___-_-______-___,__--___-________--______-____-_--____---_____--__ - 36 Data-presented on potentialoye_rpressurezones____________________ ________ NA-__ ___----___---____________--_____---- ----------------------------------- Appr Date 37 Seismicanalysis_ofshallcwgas-zones__________________________ ________ NA___ _______.-,___________--_-____--_ -- - RPC 8122!2005 38 Seabed condition survey-(if off-shore) - - _ NA --- - - - -- - - 39 -Contact name/phone_for_weeklyprogressreports[exploratoryonly~_________ ________NA___ -____--- _.____-_______-_____________.-____----__-_--__-----___----_-- Geologic Engineering P Commissioner: Date: Commissioner: Date ' ner Date ®~ s ~1~3 Is ~~~ ~ z3~5 g z ~~o ~ , •