Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-226
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU P2-40 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 197-226 50-029-22837-00-00 13982 Conductor Surface Intermediate Production Liner 9169 78 5942 13940 13892 20" 9-5/8" 7" 9169 32 - 110 38 - 5980 35 - 13975 32 - 110 38 - 4950 35 - 9220 none 3090 5410 none 5750 7240 13566 - 13728 3-1/2" 9.2# L-80 33 - 13491 8967 - 9068 Structural 4-1/2" Baker S-3 Perm, 13437, 8890 TRDP1 , 2199 , 2199 13437 8890 Bo York Operations Manager Eric Dickerman Eric.Dickerman@hilcorp.com 907.564.5258 PRUDHOE BAY, PT MCINTYRE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0034622 33 - 8920 134 486 275 404 407 632 1407 1549 278 285 N/A 13b. Pools active after work:PT MCINTYRE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 10:57 am, Sep 05, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.08.31 15:15:07 -08'00' DSR-9/12/23WCB 3-13-2024 RBDMS JSB 090823 ACTIVITYDATE SUMMARY 8/14/2023 ***WELL FLOWING ON ARRIVAL*** Pressure test PCE 200LP - 3000HP RIH with 1 7/16" Cable Head, 2" Weight Bar, 1 11/16" GR/CCL, 1 11/16" Mono Jars, 2" Dummy Drift Guns (Max OD = 2" , Max lenth = 38') Drifted to 13,805 ELM ***WELL FLOWING ON DEPARTURE*** Job continued 8-15-23 8/15/2023 Job continued from 8-14-23 ***WELL FLOWING ON ARRIVAL*** Pressure test PCE from 200LP - 3000HP Run #1: RIH with 1 7/16" Cable Head, 1 11/16 Weight Bar, (4x) 1 11/16" Sparteck Production Logging Tools (Max OD = 1 11/16" , Max Lenth = 28') Logged from 13,700' - 4,200' Run #2 : RIH with 1 7/16" Cable Head, (2x) 2" Weight bar, 1 11/16" GR/CCL, 2" Perf Guns. (Max OD = 2" , Max Lenth =28'), (loaded 10' W/ 6.8 gram Razor charges) Correlate to SLB GR/CCL dated 01-feb-98. Shooting Depth = 13,644' - 13,654' , CCL Offset = 8.5', CCL Stop Depth = 13,635.5' Run #3 : RIH with 1 7/16" Cable Head, 1 11/16" GR/CCL, 2" Perf Guns. (Max OD = 2" , Max Lenth =38'), (loaded 30' W/ 6.8 gram Razor charges) Shooting Depth = 13,614' - 13,644' , CCL Offset = 7.4', CCL Stop Depth = 13,606.6' ***WELL LEFT FLOWING ON DEPARTURE*** 8/21/2023 ***WELL FLOWING ON ARRIVAL*** PT PCE 250LP-3000HP PERFORATE FROM 13705' - 13725' MD WITH GEO RAZOR XDP CHARGES, 6 SPF, 60 DEG PHASED. CCL STOP DEPTH=13697.4', CCL TO TS=7.6'. LOG TIED INTO SLB COLLAR LOG DATED:01-FEB-1998 PERFORATE FROM 13687' - 13705' MD WITH GEO RAZOR XDP CHARGES, 6 SPF, 60 DEG PHASED. 200# PRESSURE CHANGE ON TUBING AFTER FIRST GUN RUN. ***CONTINUED ON 8/22/2023*** 8/22/2023 ***CONTINUED FROM 8-21-2023 WSR*** PT PCE 250LP-3000HP PERFORATE FROM 13594' - 13614' MD W/ 7 GRAM GEO RAZOR CHARGES, 6 SPF, 60 DEG PHASED. CCL STOP DEPTH=13586.4', CCL TO TS=7.6'. LOG CORRELATED TO SLB COLLAR LOG DATED: 01-FEB-1998 PERFORATED FROM 13566' - 13594' MD W/ 7 GRAM GEO RAZOR CHARGES, 6 SPF, 60 DEG PHASED. CCL STOP DEPTH=13555.5' MD, CCL TO TS=10.5' MD. ***WELL HANDED OVER TO PRODUCTION TO POP*** Daily Report of Well Operations PBU P2-40 PERFORATED FROM 13566' - 13594' MD PERFORATE FROM 13687' - 13705' MD PERFORATE FROM 13594' - 13614' MD PERFORATE FROM 13705' - 13725' MD STATE OF ALASKA , JKA OIL AND GAS CONSERVATION COM. JION REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubinh Operations shutdown ❑ Performed Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casinm Change Approved Program ❑ Plug for Redrill ❑'erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well Q Other 2 Operator 4 Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development 0 Exploratory ❑ 197-226-0 3 Address P 0 Box 196612 Stratigraphic E Service ❑ 6 API Number Anchorage,AK 99519-6612 50-029-22837-00-00 7 Property Designation(Lease Number) 8.Well Name and Number ADL0034622 PTM P2-40 9 Logs(List logs and submit electronic and printed data per 20AAC25 071) 10.Field/Pool(s) PRUDHOE BAY,PT MCINTYRE OIL 11 Present Well Condition Summary Total Depth measured 13985 feet Plugs measured None feelR EC E l 11�/ E D true vertical 9225 78 feet Junk measured None feet MAS, 1 y A t 2015 Effective Depth measured 13892 feet Packer measured 13441 04 feet true vertical 9169 49 feet true vertical 8889 82 feet 1 V G C C Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 78 20"Conductor 32-110 32-110 0 0 Surface 5942 32 9-5/8"40#L-80 37 72-5980 04 37 72-4949 76 5750 3090 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production None None None None None None Liner None None None None None None Perforation depth Measured depth 13566-13606 feet 13690-13728 feet SNEU 0 .1 201 True Vertical depth 8967-8991 72 feet 9044 07-9067 93 feet Tubing(size,grade,measured and true vertical depth) 3-1/2"9 2#L-80 32 87-13490 56 32 87-8920 29 Packers and SSSV(type,measured and true vertical depth) 4-1/2"Baker S-3 Perm Packer 13441 04 8889 82 Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured). Treatment descnptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 50 276 3326 271 Subsequent to operation 0 0 0 0 14.Attachments(required per 20 MC 25 070,25 071,s 25 283) 15 Well Class after work Daily Report of Well Operations ❑ Exploratory Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16 Well Status after work Oil U Gas ❑ WDSPL ❑ Panted and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 1 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email Nita.SummerhaysCa�bp corn Printed Name Nita Summerha Title Data Manager i Signatur.,..---.4".41 , "7 .d. ---,_ Phone 564-4035 Date 5/13/2015 V tL- 5-12-f j I5 RBDMSi MAY 1 5 2015 4r-Fo14 )----- Form rm 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0034622 ACTIVITY MARY ***WELL S/I ON ARRIVAL*** (perforating) R/U SWCP 4519 TAG 3-1/2' CAMCO SSSV TRDP-1A-SSA @ 2172' SLM/2199'MD 4/5/2015 ***WSR CONT 0 4/6/15*** ***WSR CONT FROM 4/5/15***(perforating) RIG DOWN SWCP 4519 MOVE TO WEATHER TICKET(high winds) 4/6/2015 ***JOB IN PROGRESS*** ***WELL S/I ON ARRIVAL***(perforating) TAG CAMCO 3-1/2'TRDP 1A-SSA @ 2173' SLM/2199' MD 4/11/2015 ***WSR CONT ON 4/12/15*** ***WSR CONT FROM 4/11/15***(perforating) RAN FLAPPER CHECKER TO 2172' SLM/2199' MD ( flapper open) DRIFT W/2"x 20" DMY GUN, SAMPLE BAILER, TO 13,561' SLM( no sample recovered) RUN SBHPS GAUGES PER PROGRAM (SEE LOG FOR DETAILS) DRIFT W/2" x 10" DMY GUN, TEL, SAMPLE BAILER, TO 13,778'/13,808' ELMD( no sample recovered) RAN PDS GR/CCL/24 ARM CALIPER FROM 13,768' SLM TO SURFACE ( good data) ***WSR CONT ON 4/13/15*** 4/12/2015 T/I/0=960/1087/327 Temp=S/I (Assist Slickline) MIT-IA 3000 psi ***PASSED*** Pumped 5 bbls meth followed 2 bbls crude to reach MIT-IA test pressure of 3000 psi. Test results follow: 1st 15 minutes IA lost 52 psi. 2nd 15 minutes IA lost 15 psi for total loss of 67 psi over a 30 minute test. (see log). Bled pressure to 800 psi and returned —2 bbls crude. Hung tags and annulus fluid packed sign. Slickline on well upon LRS departure. 4/13/2015 FWHP's 960/800/330 ***WSR CONT FROM 4/12/15***(perforating) SET 3-1/2 "WHIDDON © 13,414' SLM/ 13.475' MD PULL STA# 5 RK-S/O FROM 12,179' SLM / 12,223' MD PULL STA#3 RK-DOME FROM 9341' SLM /9378' MD PULL STA# 1 RK-DOME FROM 4203' SLM /4228' MD SET RK-DUMMY IN STA#1 @ 4203' SLM/4228' MD SET RK-DUMMY IN STA#3 @ 9341' SLM /9378' MD SET RK-DUMMY IN STA#5 @ 12,179' SLM / 12,223' MD LRS PERFORM PASSING MIT-IA TO 3000psi 4/13/2015 ***WSR CONT ON 4/14/15*** **WSR CONT FROM 4/13/15***(perforating) PULL RK-DGLV STA#3 FROM 9341' SLM/9378' MD PULL RK-DGLV STA# 1 FROM 4203' SLM/4228' MD SET STA# 1 RK-LGLV ( 16/64th ports 1500 tro) @ 4203' SLM/4228' MD SET STA#3 RK-S/0 ( 20/64th ports) @ 9341' SLM/9378' MD 4/14/2015 ***WSR CONT ON 4/15/15*** ***WSR CONT FROM 4/14/15***(perforating) PULL WHIDDON (empty) FROM 13,414' SLM/ 13,475' MD R/D SWCP 4519 4/15/2015 ***WELL S/I ON DEPARTURE PAD-OP NOTIFIED OF STATUS*** Daily Report of Well Operations ADL0034622 T/I/0=970/979/324, Temp=S/I, Load and Kill Tbg for E-line (Perfs) Pumped 3 bbls meth spear followed by 192 bbls 1%KCL and a 25 bbls crude freeze protect down 4/20/2015 tubing for pre E-line work. E-line has well control. FWHP's=600/1015/393 ***CONTINUE FROM 20-APRIL-2015*** (E-LINE SCMT/ PERF) UNABLE TO GET PAST 5600' ON FIRST DESCENT. RECONFIGURE TOOLSTRING. RIH WITH NEW AND IMPROVED TOOLSTRING. TD TAGGED AT 13812' ELM. LOG SCMT MAIN AND REPEAT PASS FROM TD TO 13400' UP AT 30 FPM. POOH TIED INTO SLB GR-CCL 2/1/1998 PERFORATING INTERVAL = 13718'-13728'. CCL TO TOP SHOT= 3.25'. CCL STOP DEPTH = 13714.75'. PERFORATING INTERVAL = 13708'-13718'. CCL TO TOP SHOT= 3.25'. CCL STOP DEPTH = 13704.75'. PERFORATING INTERVAL = 13698'-13708'. CCL TO TOP SHOT= 3.25'. CCL STOP DEPTH = 13694.75'. PERFORATING INTERVAL = 13690'-13698'. CCL TO TOP SHOT = 5.25'. CCL STOP DEPTH = 13684.75'. WELL SHUT IN UPON DEAPRTURE. DSO NOTIFIED. FINAL T/I/O= 460/650/350 PSI 4/21/2015 ***JOB COMPLETE*** FLUIDS PUMPED BBLS 2 DIESEL 8 METH 27 CRUDE 192 1% KCL 229 TOTAL CD 000 / \ / \ ( / U ? 2 / 2 • ( mow co w c r � 00 2 ƒ $ \ co 0) > R N © a w A g 6 w c rLri ncorn c \ / E \ E � / / Loco .0 co 012 , , , , , 4.0 N / % coCNI CO CO C ra O J D ▪ Q & E7CO S 2coct _ o / --I / # \ _ # ? a �� @ / \ #c - eG U b _ & 777 CD 00 \ r-- co r L ± < \ C)w w • 2 2 © o U c ± / Z 0 DD 0 � 32R TREE= " FMC LW,3o P2-4.0 c TY NOTES:WELL REQUIRES A SSSV "`CHROM E 56 ACTUATOR BAKER C OKB.ELF\/ 47' I BF.ELEV= KOp= 2600' (a — 2023' -19-5/8"HES ES CEMENTER,D=8.865" Max Angle= 61°06970' —"CONDUCTOR, 2199' H3-1/2"CAMCO SSSV TROP-1A-SSA, D=2.812" Datum PA)= 13370' —#Datum TVD 8800'SS D= GAS LFT MANDRELS 9-5/8'CSG,40#,L-80 BUTT MOD,D=8.835" --I 5976' —4 ST MD TVD DRV TYPE VLV LATCH FORT DATE 1 4228 3994 46 14AG2 DOME RK 16 04/14/15 L 2 7043 5501 60 1.1432 DMY RK 0 12/31/97 Minimum ID = 2.75" @ 13475' 3 9379 6693 60 10#3.2s0 RK 20 04/14/15 3-1/2" HES X N NIPPLE 4 11285 7696 57 M1MG2 DMY RK 0 12/31/97 5 12223 8201 57 MMIG2 DMY RK 0 04/14/15 6 12943 8594 55 MMI32 DMY RK 0 12/31/97 7 13377 8851 53 MM1G2 DMY RK 0 07/24/04 7"CSG.26#,L-80 BUTT,.0383 bpi,D=6.276" H 13207" X X 13433' H4-1/2"XO TO 3-1/2',D=2.937" 13437 Hr X 4-112"BKR S-3 PKR,13=3.875' 13441' -13-1/2"XO TO 4-1/2'.K3=2.937' ' 13464' --13-112-HES X NP,D=2.812' 13475' H3-1/2'FES XN NP,D=2.75" 3-1/2"TBG,9.2#,L-80 EUE 8RD MOD, H 1348T 1348T H3-1/2' WLEG,D=2.992' .0087 bpi.D=2.992" 13460' —ELMO TT LOGO ON 02/01/98 PERFORATION SIJM1MARY REF LOG: SWS GR/CCL 02/01/98 ANGLE AT TOP PERF: 52"@ 13566' Note:Refer to Production DB for historical perf data SIZE SPF NTERVAL Opn/Sqz SHOT SQZ 2-1/2' 4 13566- 13606 0 02/14/98 2" 6 13690-13728 0 04/21/15 PBTD H 13892' WAWA% 7'CSG,29#,13CR NSCC,.0371 bpi,D=6.164' H 13971' DA IE REV BY COMMENTS DATE REV BY OOMFvUNTS POEM MCIt fTY RE U T 02/14/98 0-14 ORIGINAL COMPLETION 04/22/15 STF/JMD GLV C/O(04/14/15) WELL: P2-40 09/16/01 RWKAK CORRECTIONS 04/21/15 BR/PJC AOPERFS FAT No:'1972260 07/24/04 RM-VKAK GLV C/O AR Pb: 50-029-22837-00 02/18/11 MB/JMD ADDED SSSV SAFETY NOTE SEC 14,T12N,R14E,328'FT/&1324'FW.. 04/09/15 PJC CSG/LW/TBG/GLV UPDATES 04/10/15 ED/PJC CMTR/NR CSG/TBG UPDATES BP Exploration(Alaska) Cv `�/+� (060 c Yo W N to m J mCU cll U Q� 0° J Yrt3 47_ �J J T ,A Q1n 'U j 6C 2 0 Xrpas A O 0_ c 2 _0 Y V rrd c s 00 o u7 "3 6C3 H ro Y CD uN > C O c ' p C O 'O x O a O O O m O22. ,_ c0 O a1 E L _) n ?Jr • 0. Q 16 a R 10 �^ L G C y° 1 Q Q 2 Q Q ¢ Q Q Q E � � �Qv cO N N N N a N N 1� 47_,- @ )' O VO -a E VO y .,,,u 0 0 0 0 0 0 0 0 0 0 0 a v c L J J J J J ) J J J J J C L r... • W W W W W W W W W W W p° , (a Q 0 a;; LL LL LL U. LL W LL LL U.. LL LL 7, a) E 'O '^ J J J J J -/ J J J J J Q .L O @ C) o Q Q a Q a Q Q a Q Q Q • (7) Z Z Z z Z Z Z Z Z Z Z u@ 0 o u O C) IS LL LL LL LL LL LL LL LI- LI- LL LL a) L IJ N O 9) ) > C V ✓ et, 5 '.y E a N O O O v1 Z v, a v -a Ucrl S. • O � O C v �, a) a 1. H Z O V • Z F F- F- Q a.) L 00 CO > (;� (0 .. HLai.; LL L.L. H Cn fn Cn G 0" O LL C CP N 0 W it = 0 W U Q Q J r a a d gi a 0 Z ,y a d u' 0 5 T== • O OC• I o 1+1 i0• on• 13 x 0_W y On0 ilf irk 1 ai a o . b ay W 0` >, >- 0 0 0 > 0. J J O O J J O O Z Z Z W 8 a M yLLj al co cc H W W W W J J J .(► rf? V >- >- aaaa II° ^� gmmmImm (nmmmm W W W W W E2 W W W W < E Z 0 0 0 0 0 0 Q 0 0 0 0 0 0. 2 2 2 2 2 2 J 2 2 m 2 L O 0 0 F 0 0 0 0 0 0 0 a V 7. > > > Z > > a 0 > O > (o daaO6a. d a0 0 a YO cc w ...,1...a _. 0. 01 N O M O (D O n x N CV O i N M N M M O h O O IX ' C:' D O 0 O O O O O N N fa OO O O O O O O O 0 0 0 — 0 o 0 0 0 o 0 o o o 'Ic �_ 0 a LL 0 v x 1- 0 0 E � � con -) a) 'C c Nr "r M Tt (0 (0 O > Q N N -a W 0 0 0 0 0 0 0 0 0 0 0 a N 14 x ea o o 0 (`') 0 0 .- O O N In U 0 0 0 0 0 0 0 0 0 0 0 0 Na- M N u ( 0) O) ' (0 CM M M a) CO CO CO V CO M •� O N 0 0 0 N _ M 0 0 tr- N N N N N N N N N N N V n 0) 0) 0) O T O T 0) O 0) 0) 0 J o NNNNNN NNNNN 01 0 0 0 0 0 0 0 0 0 0 0 O O o O O O O O O O O i In (n u) a) N In In In In In Y) + o a) _M CO C !Z V C = W g E aL.) 5 Q) o cc ` C Q o o U o co Q o) N CO 0 a) 0 ri / G a7 00 M T 4' M M N M 4., EL. F- o. Q (`) o 0 2 a N o 0 0 E cc z a) co L ' `-i ^ iL. H • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 AU 1. L``4 Mr. Jim Regg a — Alaska Oil and Gas Conservation Commission 1 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, ) 7111- " :7)C( 2 17 Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM -2 Date: 04/30/2012 Corrosion Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 10.20 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2 -06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2 -08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2-09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2-31 1940360 50029224560000 2.2 NA 2.2 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 ---, P2-40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2-41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2-43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P244 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P2-47 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P2-49 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2-59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 THE MATERIAL UNDER THIS__COVER HAs ON OR BEFORE BEEN. PL E M ATE IA L U N D-W E R C:LOREMI:ILM. DOC 197-226-0 MD 13985 TVD 09225 T Name D 8219 k.G~pletion Date: 2/14/98 Completed Status: 1-OIL Current: Interval Sent Received T/C/D SPERRY MPT/GR/EWR4/CNO/SLD OH 1/14/98 1/14/98 L DGR/CNP/SLD-MD L DGR/CNP/SLD-TVD L DGR/EWR4-MD L DGR/EWR4-TVD L MEM PROD-SPIN/ L PNL/B-W/RST R MWD SRVY ~L 5990-13985 OH 1/14/98 1/14/98 ~AL 4955-9224 OH 1/14/98 1/14/98 LI~AL 5990-13985 OH 1/14/98 1/14/98 ~NAL 4955-9224 OH 1/14/98 1/14/98 ~FfNAL TEM/PRES 13400-13775 5/22/99 CH 5 6/7/99 6/10/99 )~AL 13460-13833 3/19/99 CH 5 6/7/99 6/10/99 t~RRy 0.-13985. OH 1/13/98 1/14/98 Was the well cored? yes ~qt~_ Analysis Description Received.~~- Sample~ Comments: Thursday, February 03, 2000 Page 1 of 1 6/7/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATrN: Sherrie NO. 12627 Company: Alaska Oil & Gas Cons Comm ( Attn: Lori Taylor I 3001 Porcupine Drive Anchorage, AK 99501 Field: Point Mclntyre Floppy LIS Well Job # Log Description Date Blueline Sepia Disk Tape P1-08 PB1 MCNL 990318 1 1 P2-40 PNL BORAX W/RST 990319 1 1 P2-40 MEMORY PROD, PROFILE 990522 1 1 P2-56 CNTG 990316 ] ] SIGN DATE: Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 562-6521. ~ STATE OF ALASKA .,-- · ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [~ Oil I~ Gas E~] Suspended E] Abandoned [--I Service 2. Name of Operator 7. Permit Number ARCO Alaska inc. 97-226 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22837 4. Location of well at surface 9. Unit or Lease Name 329' SNL, 1325' EWL, SEC. 14, T12N, R14E, UM Point Mclntyre At top of productive interval 10. Well Number 1893' NSL, 3195' WEL, SEC. 3, T12N, R14E, UM P2-40 At total depth 11. Field and Pool 2192' NSL, 3394' WEL, SEC. 3, T12N, R14E, UM Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 47'I ADL034622 12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Susp., or Aband115. Water depth, if offshore 116. No. of Completions 12/9/97 12/20/97 2/14/98 N/A MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thick~s.~0.f~.errea. fre.st,- 13985 9225 F~' 13892 9169 FTI (~Yes E]NoI 2199' MDI 22. Type Electric or Other Logs Run Gyro, MWD, EMMS, LWD, GR/CCL '. ~-~,-~.. 23. CASING~ LINER AND CEMENTING RECORD CASING SE~-I'ING DEPTH HOLE C0P.~, SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD ?J~tCJfJ~l~,JPDd~.8¢ 20" 133# H-40 36' 105' 30" 260 sx Arctic Set (Approx.) A,qchorage 9-5/8" 40# L-80 34' 5976' 12-1/4" 1299 sx Coldset III, 634 sx Class 'G' 7" 26#/29# L-80/13CR 31' 13971' 8-1/2" 250 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-1/2" Gun Diameter, 4 spf 4-1/2", 12.6#, 13CR80 13487' 13437' M D TVD M D TVD 13566'-13606' 8967'-8991' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 173 bbls diesel Frac, 13566'-13606' 103225# 16/20 Carbolite behind pipe 27. PRODUCTION TEST ~ F'%' i ~--- i i: Date First Production I Method of Operation (Flowing, gas lift, etc.) ~ ~ i ~ ~ i March 9, 1998 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure 0ALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithoiogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate Marker Name Top West Sak HRZ Kalubik Kuparuk Geologic Markers Measured Depth 9740' 13369' 13440' 13528' True Vertical Depth 6876' 8846' 8889' 8943' 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true an¢'corre, ct to/t~., best of my knowledge . -) ~ -, ,/' Signed .. ~./~,.-. ~' ~(")~,.. /~ /'~'~-'~/;/~itle Drillin~ervisor SteveShulU ~~ ~ ~'. c ~/ . , , '- -226 " P2-40 Well Number Permit No. / Approval No. Prepared By Name/Number: Kathy Campoamor, 564-5122 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: if this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Performance Enquiry Report Operator ARCO Date 02:16, 29 Apr 98 Page 1 The analysis is from - 11:30, 15 Dec 97 - to - 11:30, 15 Dec 97 Programs in Result Table: P2-40 Well Type Time From Time To Duration Description E.M.W.(ecfuivalent mud weight) P2-40 Event 11:30, 15 Dec 97 11:30, 15 Dec 97 0 hr 0 min Obtained leak off 13.5 Hole Size MDR 8-1/2 Facility Date/Time 08 Dec 97 09 Dec 97 10 Dec 97 11 Dec 97 12 Dec 97 13 Dec 97 14 Dec 97 Pt Mac 2 06:00-07:30 07:30-09:30 09:30-11:00 11:00-13:00 13:00-14:00 14:00-16:30 16:30-18:00 18:00-18:30 18:30-04:30 04:30-06:00 06:00-21:00 21:00-21:15 21:15-06:00 06:00-02:00 02:00-02:30 02:30-02:45 02:45-04:00 04:00-05:00 05:00-06:00 06:00-06:00 06:00-19:15 19:15-20:00 20:00-21:45 21:45-22:00 22:00-23:00 23:00-00:30 00:30-00:45 00:45-01:00 01:00-01:15 01:15-03:30 03:30-06:00 06:00-06:30 06:30-07:30 07:30-08:30 08:30-09:00 09:00-15:30 15:30-16:30 16:30-17:00 17:00-17:45 17:45-18:15 18:15-19:00 19:00-21:00 21:00-21:15 21:15-22:00 22:00-22:30 22:30-00:30 00:30-02:30 02:30-04:00 04:00-06:00 06:00-08:30 08:30-13:00 13:00-17:30 17:30-18:00 18:00-20:15 Progress Report Well P2-40 Rig Doyon 14 Page Date Duration 1-1/2 hr 2hr 1-1/2 hr 2hr lhr 2-1/2 hr 1-1/2 hr 1/2 hr 10hr 1-1/2 hr 15hr 1/4 hr 8-3/4 hr 20 hr 1/2 hr 1/4 hr 1-1/4 hr 1 hr 1 hr 24 hr 13-1/4 hr 3/4 hr 1-3/4 hr 1/4 hr 1 hr 1-1/2 hr 1/4 hr 1/4 hr 1/4 hr 2-1/4 hr 2-1/2 hr 1/2 hr lhr lhr 1/2 hr 6-1/2 hr lhr 1/2 hr 3/4 hr 1/2 hr 3/4 hr 2hr 1/4 hr 3/4 hr 1/2 hr 2 hr 2hr 1-1/2 hr 2hr 2-1/2 hr 4-1/2 hr 4-1/2 hr 1/2 hr 2-1/4 hr Activity Rig moved 100.00 % Rigged up Well control Rigged up Drillfloor / Derrick Made up BHA no. 1 Washed to 105.0 ft Made up BHA no. 1 Rigged up Logging/braided cable equipment Held safety meeting Rest hole at 105.0 ft Drilled to 146.0 ft Drilled to 1125.0 ft (cont...) Rigged down Logging/braided cable equipment Drilled to 1728.0 ft Drilled to 1728.0 ft (cont...) Circulated at 3601.0 ft Flow check Pulled out of hole to 1750.0 ft R.I.H. to 3601.0 ft Drilled to 3696.0 ft Drilled to 5390.0 ft (cont...) Drilled to 5990.0 ft (cont...) Circulated at 5990.0 ft Pulled out of hole to 3000.0 ft Flow check R.I.H. to 5990.0 ft Circulated at 5990.0 ft Dropped EMMS survey barrel Flow check Circulated at 5590.0 ft Pulled out of hole to 1081.0 ft Pulled BHA Pulled BHA Serviced Block line Rigged up Casing handling equipment Held safety meeting Ran Casing to 5976.0 ft (9-5/8in OD) Circulated at 5976.0 ft Held safety meeting Mixed and pumped slurry - 213.000 bbl Mixed and pumped slurry - 130.000 bbl Displaced slurry - 446.000 bbl Circulated at 2023.0 ft Held safety meeting Mixed and pumped slurry - 230.000 bbl Displaced slurry - 153.000 bbl Rigged down Casing handling equipment Rigged down Bell nipple Rigged up Casing head Installed Well control Rigged up Well control Tested Well control Serviced Top ram Tested Top ram Installed Wear bushing 1 28 April 98 Facility Date/Time 15 Dec 97 16 Dec 97 17 Dec 97 18 Dec 97 19 Dec 97 20 Dec 97 21 Dec 97 22 Dec 97 Progress Report Pt Mac 2 Well P2-40 Rig Doyon 14 Page 2 Date 28 April 98 20:15-20:30 20:30-00:00 00:00-00:30 00:30-01:30 01:30-03:30 03:30-04:30 04:30-05:30 05:30-06:00 06:00-06:30 06:30-08:30 08:30-10:00 10:00-10:15 10:15-10:45 10:45-11:30 11:30-06:00 06:00-06:00 06:00-06:00 06:00-16:15 16:15-17:45 17:45-18:00 18:00-21:30 21:30-21:45 21:45-23:30 23:30-01:45 01:45-04:15 04:15-06:00 06:00-07:00 07:00-10:15 10:15-12:00 12:00-13:30 13:30-14:30 14:30-05:15 05:15-06:00 06:00-06:30 06:30-06:45 06:45-09:30 09:30~13:30 13:30-16:00 16:00-17:45 17:45-18:30 18:30-01:30 01:30-04:00 04:00-04:15 04:15-05:00 05:00-06:00 06:00-06:30 06:30-06:45 06:45-12:30 12:30-16:00 16:00-18:00 18:00-18:15 18:15-00:30 00:30-01:30 Duration 1/4 hr 3-1/2 hr 1/2 hr 1 hr 2 hr lhr lhr 1/2 hr 1/2 hr 2 hr 1-1/2 hr 1/4 hr 1/2 hr 3/4 hr 18-1/2 hr 24 hr 24 hr 10-1/4 hr 1-1/2 hr 1/4 hr 3-1/2 hr 1/4 hr 1-3/4 hr 2-1/4 hr 2-1/2 hr 1-3/4 hr lhr 3-1/4 hr 1-3/4 hr 1-1/2 hr 1 hr 14-3/4 hr 3/4 hr 1/2 hr 1/4 hr 2-3/4 hr 4hr 2-1/2 hr 1-3/4 hr 3/4 hr 7hr 2-1/2 hr 1/4 hr 3/4 hr 1 hr 1/2 hr 1/4 hr 5-3/4 hr 3-1/2 hr 2 hr 1/4 hr 6-1/4 hr 1 hr Activity Installed Wear bushing Made up BHA no. 2 R.I.H. to 2025.0 ft Drilled installed equipment - DV collar R.I.H. to 5655.0 ft Singled in drill pipe to 5891.0 ft Circulated at 5891.0 ft Tested Casing - Via annulus and string Tested Casing - Via annulus and string (cont...) Held drill (Kick (well kill)) Drilled cement to 5976.0 ft Drilled to 6018.0 ft Circulated at 6018.0 ft Performed formation integrity test Drilled to 7953.0 ft Drilled to 10145.0 ft (cont...) Drilled to 12145.0 ft (cont...) Drilled to 12812.0 ft (cont...) Circulated at 12812.0 ft Flow check Pulled out of hole to 5900.0 ft Flow check Pulled out of hole to 113.0 ft Pulled BHA Made up BHA no. 3 R.I.H. to 5000.0 ft Serviced Block line R.I.H. to 12812.0 ft Circulated at 12812.0 ft Drilled to 12925.0 ft Logged hole with LWD: Formation evaluation (FE) from 12802.0 ft to 12925.0 ft Drilled to 13985.0 ft Circulated at 13985.0 ft Circulated at 13985.0 ft (cont...) Flow check Pulled out of hole to 5950.0 ft R.I.H. to 13985.0 ft Circulated at 13985.0 ft Laid down 1550.0 ft of 5in OD drill pipe Held safety meeting Laid down 363.0 ft of 5in OD drill pipe Pulled BHA Removed Bore protector Serviced Block line Installed Casing handling equipment Installed Casing handling equipment (cont...) Held safety meeting Ran Casing to 5960.0 ft (7in OD) Circulated at 5960.0 ft Ran Casing to 7000.0 ft (7in OD) Held safety meeting Ran Casing to 13971.0 ft (7in OD) Circulated at 13971.0 ft Facility Date/Time 23 Dec 97 24 Dec 97 25 Dec 97 26 Dec 97 Progress Report Pt Mac 2 Well P2-40 Page 3 Rig Doyon 14 Date 28 April 98 01:30-02:00 02:00-02:30 02:30-03:15 03:15-03:45 03:45-04:15 04:15-05:00 05:00-06:00 06:00-06:15 06:15-06:30 06:30-06:45 06:45-08:00 08:00-10:30 10:30-13:00 13:00-13:15 13:15-01:00 01:00-02:00 02:00-06:00 06:00-06:15 06:15-07:00 07:00-07:15 07:15-10:00 10:00-10:30 10:30-12:00 12:00-13:00 13:00-13:30 13:30-18:00 18:00-18:15 18:15-20:30 20:30-22:30 22:30-23:30 23:30-00:00 00:00-06:00 06:00-06:15 06:15-08:30 08:30-18:00 18:00-18:15 18:15-18:30 18:30-21:00 21:00-21:30 21:30-22:00 22:00-22:45 22:45-02:15 02:15-06:00 06:00-06:30 06:30-07:00 07:00-10:30 10:30-10:45 10:45-11:15 11:15-14:30 14:30-17:00 17:00-17:30 17:30-23:30 23:30-00:00 00:00-01:00 Duration 1/2 hr 1/2 hr 3/4 hr 1/2 hr 1/2 hr 3/4 hr 1 hr 1/4 hr 1/4 hr 1/4 hr 1-1/4 hr 2-1/2 hr 2-1/2 hr 1/4 hr 11-3/4 hr 1 hr 4hr 1/4 hr 3/4 hr 1/4 hr 2-3/4 hr 1/2 hr 1-1/2 hr lhr 1/2 hr 4-1/2 hr 1/4 hr 2-1/4 hr 2hr lhr 1/2 hr 6 hr 1/4 hr 2-1/4 hr 9-1/2 hr 1/4 hr 1/4 hr 2-1/2 hr 1/2 hr 1/2 hr 3/4 hr 3-1/2 hr 3-3/4 hr 1/2 hr 1/2 hr 3-1/2 hr 1/4 hr 1/2 hr 3-1/4 hr 2-1/2 hr 1/2 hr 6 hr 1/2 hr 1 hr Activity Held safety meeting Pumped Inhibited brine spacers - volume 90.000 bbl Mixed and pumped slurry - 53.000 bbl Displaced slurry - 526.000 bbl Tested Casing Rigged down Casing handhng equipment Installed Seal assembly running tool Installed Seal assembly running tool (cont...) Tested Seal assembly Held safety meeting Serviced Top ram Tested Well control Rigged up Tubing handling equipment Held safety meeting Ran Tubing to 10151.0 ft (3-1/2in OD) Packer worked at 10151.0 ft Serviced Tubing handling equipment Held safety meeting Rigged up Logging/braided cable equipment Held safety meeting Conducted electric cable operations Prepared & in:ed cutting charge at 10105.0 ft Conducted electric cable operations Worked toolstring at 10105.0 ft Rigged down Logging/braided cable equipment Pulled Tubing in stands to 3460.0 ft Held safety meeting Pulled Tubing in stands to 4.0 ft Serviced Kelly/top drive hose Made up BHA no. 4 Installed Bore protector Singled in drill pipe to 8560.0 ft Held safety meeting Singled in drill pipe to 10116.0 ft Milled Hydraulic packer at 10116.0 ft Held safety meeting Serviced Drillfloor / Derrick Pulled out of hole to 769.0 ft Pulled BHA Made up BHA no. 5 Serviced Block line R.I.H. to 10125.0 ft Milled Hydraulic packer at 10125.0 ft Milled Hydraulic packer at 10125.0 ft (cont...) Singled in drill pipe to 10300.0 ft Pulled out of hole to 10300.0 ft Pulled BHA Made up BHA no. 6 R.I.H. to 10300.0 ft Singled in drill pipe to 13845.0 ft Fished at 13845.0 ft Pulled out of hole to 13845.0 ft Laid down fish Made up BHA no. 7 Facility Date/Time 27 Dec 97 28 Dec 97 29 Dec 97 30 Dec 97 Progress Report Pt Mac 2 Well P2-40 Rig Doyon 14 Page 4 Date 28 April 98 01:00-02:00 02:00-03:00 03:00-06:00 06:00-11:00 11:00-14:00 14:00-18:00 18:00-18:30 18:30-22:00 22:00-23:00 23:00-23:15 23:15-23:30 23:30-23:45 23:45-00:15 00:15-01:15 01:15-04:00 04:00-04:30 04:30-06:00 06:00-13:00 13:00-13:30 13:30-15:00 15:00-18:00 18:00-19:00 19:00-19:30 19:30-23:30 23:30-00:00 00:00-03:30 03:30-04:00 04:00-04:15 04:15-06:00 06:00-11:00 11:00-18:00 18:00-20:00 20:00-20:30 20:30-20:45 20:45-22:30 22:30-06:00 06:00-08:00 08:00-10:00 10:00-10:15 10:15-10:30 10:30-13:45 13:45-14:00 14:00-14:30 14:30-17:00 17:00-17:30 17:30-19:30 19:30-20:00 20:00-23:00 23:00-01:45 01:45-02:30 02:30-04:00 04:00-05:00 05:00-06:00 06:00-08:15 Duration 1 hr 1 hr 3 hr 5 hr 3hr 4hr 1/2 hr 3-1/2 hr 1 hr 1/4 hr 1/4 hr 1/4 hr 1/2 hr lhr 2-3/4 hr 1/2 hr 1-1/2 hr 7hr 1/2 hr 1-1/2 hr 3hr lhr 1/2 hr 4 hr 1/2 hr 3-1/2 hr 1/2 hr 1/4 hr 1-3/4 hr 5hr 7 hr 2hr 1/2 hr 1/4 hr 1-3/4 hr 7-1/2 hr 2hr 2 hr 1/4 hr 1/4 hr 3-1/4 hr 1/4 hr 1/2 hr 2-1/2 hr 1/2 hr 2 hr 1/2 hr 3hr 2-3/4 hr 3/4 hr 1-1/2 hr 1 hr lhr 2-1/4 hr Activity R.I.H. to 766.0 ft Rigged up Drillstring handling equipment R.I.H. to 5700.0 ft R.I.H. to 13892.0 ft (cont...) Reverse circulated at 13892.0 ft Laid down 6000.0 ft of 3-1/2in OD drill pipe Held drill (Kick while tripping) Laid down 7076.0 ft of 3-1/2in OD drill pipe Pulled BHA Removed Wear bushing Held safety meeting Rigged up Tubing handling equipment Laid down 35.0 ft of Tubing Serviced Lines / Cables Rig waited: Materials Held safety meeting Ran Tubing to 3-1/2in (1250.0 ft OD) Ran Tubing to 6930.0 ft (3-1/2in OD) (cont...) Pulled Tubing in stands to 6522.0 ft Packer worked at 6522.0 ft Serviced Tubing handling equipment Rigged up Logging/braided cable equipment Held safety meeting Conducted electric cable operations Rigged down Logging/braided cable equipment Pulled Tubing in stands to -0.0 ft Rigged down Tubing handling equipment Rigged up Wear bushing Made up BHA no. 8 Singled in drill pipe to 6492.0 ft Milled Packer & tailpipe assembly at 6492.0 ft Pulled out of hole to 6403.0 ft Pulled BHA Made up BHA no. 9 R.I.H. to 6503.0 ft Milled Packer & tailpipe assembly at 6503.0 ft Milled Packer & tailpipe assembly at 6503.0 ft (cont...) Pulled out of hole to 6503.0 ft Pulled BHA Retrieved Wear bushing Tested BOP stack Installed Wear bushing Made up BHA no. 10 R.I.H. to 6503.0 ft Fished at 6503.0 ft Pulled out of hole to 7.0 ft Pulled BHA Made up BHA no. 11 R.I.H. to 6403.0 ft Fished at 6503.0 ft Pulled out of hole to 7.0 ft Pulled BHA Serviced Block line Made up BHA no. 12 Facility ! Pt Mac 2 Progress Report Well P2-40 Rig Doyon 14 Page 5 Date 28 April 98 Date/Time 31 Dec 97 01 Jan 98 02 Jan 98 03 Jan 98 04 Jan 98 08:15-15:00 15:00-16:00 16:00-21:30 21:30-22:30 22:30-23:30 23:30-06:00 06:00-06:15 06:15-07:30 07:30-08:15 08:15-09:30 09:30-10:00 10:00-11:30 11:30-12:00 12:00-14:15 14:15-19:45 19:45-20:00 20:00-20:30 20:30-21:00 21:00-05:00 05:00-06:00 06:00-09:00 09:00-14:00 14:00-14:30 14:30-16:30 16:30-18:00 18:00-19:00 19:00-21:00 21:00-23:30 23:30-01:30 01:30-03:30 03:30-06:00 06:00-08:30 08:30-10:15 10:15-13:15 13:15-03:00 03:00-04:00 04:00-04:15 04:15-04:45 04:45-05:30 05:30-06:00 06:00-02:30 02:30-04:00 04:00-06:00 06:00-06:15 06:15-07:00 07:00-07:30 07:30-10:30 10:30-14:00 14:00-15:00 15:00-15:45 15:45-16:30 16:30-18:00 Duration 6-3/4 hr lhr 5-1/2 hr lhr lhr 6-1/2 hr 1/4 hr 1-1/4 hr 3/4 hr 1-1/4 hr 1/2 hr 1-1/2 hr 1/2 hr 2-1/4 hr 5-1/2 hr 1/4 hr 1/2hr 1/2hr 8hr lhr 3hr 5 hr 1/2 hr 2hr 1-1/2 hr 1 hr 2hr 2-1/2 hr 2hr 2hr 2-1/2 hr 2-1/2 hr 1-3/4 hr 3hr 13-3/4 hr lhr 1/4 hr 1/2 hr 3/4 hr 1/2 hr 20-1/2 hr 1-1/2 hr 2 hr I/4 hr 3/4 hr 1/2 hr 3hr 3-1/2 hr lhr 3/4 hr 3/4 hr 1-1/2 hr Activity R.I.H. to 13835.0 ft Fished at 13835.0 ft Pulled out of hole to 7.0 ft Pulled BHA Made up BI-IA no. 13 R.I.H. to 7500.0 ft R.I.H. to 9000.0 ft (cont...) Circulated at 9000.0 ft R.I.H. to 10500.0 ft Circulated at 10500.0 ft R.I.H. to 12000.0 ft Circulated at 12000.0 ft R.I.H. to 13207.0 ft Circulated at 13207.0 ft Pulled out of hole to 4.0 ft Pulled BHA Jet wellhead Made up BHA no. 14 R.I.H. to 13816.0 ft Circulated at 13816.0 ft Circulated at 13816.0 ft (cont...) Pulled out of hole to 17.0 ft Pulled BI-IA Conducted slickline Conducted slickline Conducted slickline Conducted slickline Conducted slickline Conducted slickline operations on Slickline equipment - Tool mn operations on Slickline equipment - Tool run operations on Slickline equipment - Tool run operations on Slickline eqmpment - Tool mn operations on Slickline equipment - Tool run operations on Slickline equipment - Tool mn Conducted slickline operations on SIickline eqmpment - Tool mn Conducted slickline operations on Slickline eqmpment - Tool mn Conducted slickline operations on Slickline eqmpment - Tool run Conducted slickline operations on Slickline eqmpment - Tool mn Conducted slickline operations on Slickline eqmpment - Tool mn Laid down 11500.0 ft of 3-1/2in OD drill pipe Serviced Block line Removed Wear bushing Held safety meeting Installed Tubing handling equipment Ran Tubing to 3-1/2in (180.0 ft OD) Ran Tubing to 13486.0 ft (3-1/2in OD) (cont...) Removed BOP stack Installed Xmas tree Installed Xmas tree (cont...) Tested Xmas tree Retrieved Hanger plug Circulated at 13486.0 ft Circulated at 13486.0 ft ~ Set Production packer at 13437.0 ft with 2500.0 psi Tested Tubing Tested Casing Removed High pressure lines-installed BPV[ rd test lines, close ali valves on x-mas tree well secured, rig released 1800 hrs 4Jan98 SENT BY:MESSAGE CENTER ; ,3-26-98 ; 2'0?PM ; ARCO PBOC~ 907 564 5193;# 5/ 7 ' EL Well Work Log .... Da't~ Description .... DS-Well .... 2/14/98. IPERF P2-40 FTp/ITP PSI IA PSI CA PSI SITP -Mtn ID ........ SSSV nipple 0---1400 2.75"@ 13475' CA TRDP ~$$SV Information ...... :l'U'l~lar or casing Problems PB~D C/~ ~'~ ~.~'-~ C/E#2 IC/E #3 CIE #4 C/E #5 Diesel (Rocov.) Diesel (non Roco~.AFE # ~CC4~ Class Activity ....... 2B0217 PMDS009DH ~ I;-~...~- -- ~ ~ ~' Time ,L,,,o,.g Entry 08:30 MIRU SWS #8337 W/BAILEY-LEVY-HUSEI~,I~--HOLD I¢~,FETY MEETING. ' ........ 10:30 FINISH R/U---ARM 2 1/2" HSD CARRIER GUN, 10', 4 SPF, ALTER~ATING BH / DP CHARGES. 10:45 P/TTO 2500 PSI 10:55 RIH W/sWI~/EE-- CCL-L-- 2 1/2" HSD, 10', 4 SPF, 180 PEG PHASING, 138 CC-W ORIEN~ATI©N,- 1 11/16" ROLLER W/2" WHEELS--2 1/8" HD WT--1 11/16" HD ROLLER W/2" WHEELS. 12:00 TIE-IN TO SWS GR/CCL DATED 1-FEB-98. JEWELRY COLLARS WERE GOOD BUT CHROME "I~INER COLLARS WERE VERY wEA~K~ .......... - 12:35 LOGGED INTO POSITION AT 13592,5' TO SHOOT FROM 13596' TO 13606'---GOOD SHOT INDICATIONS. 12:45 POOH TO LAY DOWN GUN #1 AND PICKUP GUN #2, ., 14:30 ARM 2 1/2" HSD CARRIER GUN, 10', 4 SPF, ALTERNATING BH / DP CHARGES---RIH. ' .... ........ __.16:00 LOGGED INTO POSITION AT 13582.5' TO SHOOT FROM 13586' TO 13596'--GOOD SHOT INDICATIONS. 16:05 POOH TO LAY DOwr~'~'0-1q~2 ~ PICKUP ~JN #3, ' .... 18:00 ARM 2 1/2" HSD CARRIER GUN, 10', 4 SPF, ALTERNATING BH / DP CI~,~RGFS---RIH. 19:30 LOGGED INTO POSf['ION AT 13572,~' TO SHOOT FROM 13576' TO 13586'--GOOD SHOT INDICATIOI~S. 19:35 POOH TO LAY DOWN GUN #3 AND PICKUP ~I~N #4. ' ......... .. 21:00 ARM 2 1/2'"' HSD CARRIER GUN, 10', 4 SPF, ALTERNATING BH / DP CHARGES---RIH. 21:30 HAD TROUBLE GETTING DOWN THROUGFI SSSV--ACCUMULATOR HAD FAILED. ,_23:10 .~FI_N._ALLY GOT._SSS_V TO.. OPE_N_ By PUMPING DOWNHOLE---START GOING DOWNHOLE AGAIn. 00:30 LOGGED INTO POSITION AT 13562.5' TO SHOOT FROM 13566' TO 13576', 00:40 POOH 03:00 "AT SURFAcE_START R~0 ..... 04:00 FINISH R/D--LEAVE LOC, Results Summary - Address each objective listed in Job request - e. g. splits, GCC pick, channels, ~-tC,- SHOT FROM 13566" TO 13606' WITH 2 1/2" HSD CARRIER GUNS, 180 DEGREE PHASING AND 138 PEG CCW ORIENTATION. SHOT WITH BIG HOLE CHARGES DOWN AND DEEP PENERTATING CHARGES ACROSS THE WELLBORE. -- . ! IIIII I &l I I .......... _ Perforatln9 Il'lion/al (BHC$ depths) Gun Info. (insert more lines Top(fl) Bottom SPF Grams/EHD/I'TP Phasing Orient O/B/U Zone .... Ad/R.ep.e~.. 13596 13606 2 10.5G/0.61"/5,01" 180 138 CCW B UC IPERF 13596 13606 2 10.SG/0,29"/17.3" 180 138 CCW B UC IPERF I I! II I I I ..... Illmll i P or IPROF: Well rate (attach W$3.0.)_ SBHPS Pump in Lo,Is (LDL, PNL, etc.) ... BOPD: F/ITP:~ MD: Note fluid Pum~e_d and bbls behind ['of. Gasi ..... GOR: SS: :~ipe in "log entry" seCtion r~xt~o each BWPD: WC (%): Press; ~ass made GL Gas: Choke o: Temp: , III I I Ill II I SENT BY'MESSAGE CENTER ; 8-26-88 ; 2'08P~ ; ARCO PBOC~ ¢fl07 864 8198;# 6/ 7 Well Work Log . Pat® ' Desc'~iptlon -- '~ ~ DS-Well 2/26/98 HYDRAULIC FRAE:: P2-40 sSsv Pulled ' SSSV Pulled Ser. No, ssSv Ran 'SSSV Ron Ser. No Tbg/Tr Sizes N/A N/A N/A N/A 3 1 ~u - - -'-" Recoverable Diesoi" Non-Recov, Dies"eI Carrier Ran Carrier Ser. No. $SSV Nipple 60 bbls 40 bbls N/A N/A 4 1/2" CA TRDP FI"P/lIP' 9 5/8" PSI 13 3/8" ~Sl $1TP Min. Rest./Depth N/A 1,..000_psi POS~ 1,500 psi _~:75" @ 13,46,4' SSSV Information Tubular or Casing Problems FRAC SLEEVE NON[ I Ill . . pl,$ ;; ..... Il J .... ~-, .-' - .- ' ~ ' Cost Estimate #"1 Cost Estimate #2 Cost Estimate #3 'Cost Estimate #4 Cost Estimate #5 DOW DIE ~"~'" L.~.'-"-,LII'rLE RED/..~?.~ 0 FRAC 100 BBLS PUMP 0 s52,o8o,oo ¢-- sreeeee so.aa AFL No. CC ~f 'L-/a~;~"" Class .... 0 Tagged-pBT¢ ..... 2B0217 PMDSOE)gDH,,. (~'l/~¢'?~,', F~..,. ~ C NA ___Time ....., ,, L0~I Entry , 06:00 MIRU, DS (DOUGHTON,) 4 TURBINES, LRS BACKSIDE PUMP 08:30 we WELLHEAD TANK (DSM) 3 FRAC TANKS: 1410 BBLS 08:45 INSTALL4 1/2" TREESAVER 10:30 SAFETY MEETING; Dow: 14, vEc~D~-'I-~- L~: 2. ARCO: 2 il , ,. '~.- - 10:50 PRESS BACKSIDE @ 2500¢ INITIAL ,1~ ~ i i L 11:30 WARM LINESWITH DIESEL 11:45 SET TREESAVER CUPS Illl ' ..... Ill 11:50 PT @ 90004/ 11:55 PUMP BREAKDOWN, 20 BBLS AWAY, CUPS DID NOT COMPLETELY SET "11 ;57 SWITCH TO DIESEL TO PR HL REHEAT DIESEL W/LRS 12:30 PIJ'LL TREESAVER; BI~OKEN cuPs -'~" CONFi'I~ PUP SIZE (4.5 12.6) WITH FMC 13:15 INSTALL TREESAVER; PUlL AND ~EPI_ACE TS; CUT ORING 14:30 WARM LINES AND SET TREESAVER: 2' STROKE (VF~RY TIGHT FIT; APPEARS OK) lid.- Ill ...... L- 15:0r) FIX VALVE LEAK ON DISCHARGE HEADER ~ I I I ._ 15:25 PUMP B~EAKDOWN, 50# XLK, 173 BBLS, 24 BPM, 7200# i[i _ , ,,~,.~,.,-. 15:33 SCOUR, 1 PPA, 50 # XLK, 50 BBLS, 4200# ' 15:36 FLUSH, 10 XLK + ~",Sb'~:CL, 15 BPM, 4100/4700tt .... 15:54 SHUT DOWN FOR ISIP; 1850-1950# 16:15 DATA FRAC. 50# XLK. 127 BBLS, 5 BPM, 2200/2700 PSI 16:40 2% KCL 8 +132 BBLS, 15 BPM, 4500/4200 PSI '-' 1'6:50 SHUT DOWN FOR ISIP: 220G2300# INCREASE PAD 10 125 BB~ (LIMITED BY VOLUME ON HAND) 18:10 PUMP PAD, t25 BBLS, 5 BPM, 2100 PSI; INCREASE RATE TO 15 BPM WHEN AT PERFS 18:34 2 PPA,. 26 BBLS, 15 BPM, 3800 PSI ,.. 1-6:35 RAMP 3-12 PPA, 1,5 BPM, PROPNET 19:07 FLUSH, ADDING DIESEL 19:15 $CREENOUT 3.5 BBLS sHORT OF FULL FLUSH RIG DOWN IRON, PULL TREESAVER, BLEED IA TO 2000# 21:0[3 RELEASE WELL WELL IS FREEZE PROTECTED TO AT LEAST 3000' WITH DIESEL Signed Page No. of Jerry Dethl..ef s ......... 1 2 SENT BY'MESSAGE CENTER ; 8-26-98 ; 2'09PM ; ARCO PBOC~ fl07 864 8198;g 7/ 7 Well Work Log Date ' Descripfi~,~- - '' '~' IDS-W~II 2/26/98 HYDR_AULIC FRAC P2-40 Time Log Entry i mm ..... iml I i i mlm,ll ~ SUmmARY: ,~, ........ SCREENOUT WITH 3.~'BBLS'~HORT OF FULL FLUSH ESTIMATED SANI~ PUMPED: 107,,509 LBS ESTMATED SAND IN PERFS: 103,225 LBS IN PERFS SAND IN CASING: 4,284 LBS SAND RAMPED FROM 2 TO 12 PPG F isip APPR-bx 220G230'~'1~'$1 t POMPED 731.5 IOTAL DIRIY VOLUME' ' suPpED DESEL ~N ON [LUSff TO F~"WELt. .......... PUMPED PERF BR~EAKDOWN. DATA FRAC, AND Fr~AC ........ --. CUT 12 PPG EARLY (3 BBLS) DUE TO LOW FLUID VOLUMe;' ~_EF-:'r 8500# ON SURFACE MAX PRESSURE SEEN @ 7900 PS1 AVE:RAGE TREATING PRESSURE 5600 PSi i rolm * Il ii AVERAGI~'~ATE 15 BISM HE"I'D 3500 P~i'~)'~'i'A: NO PROBLEMS II~DIcATED ............. mi _ ,.- .,__ - Il .... Jr' I 11 m,~ =NJ · I NOTE: CHECK OUT TUBING HANGER PUP DETAIL. TUBING TALI'Y DOES NOT SHOW TUBING HANGER PUP. PUP IS 4 1/2'" 12.6#, NOT :3 1/2" ......... . ,1 i.~ ,~ · _ m , --~, '"~. -- - - _~ ., _ · ..... _ " .... .~ · ,,. ,. .... . Signed Page No. of Jerry Dethlef $ 2 2 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 MWD SURVEY JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. .00 .00 -47.00 0 0 N .00 E .00 .00N .00E .00 35.40 35.40 -11.60 0 0 N .00 E .00 .00N .00E .00 135.00 135.00 88.00 0 6 S 14.60 E .10 .08S .02E -.08 225.00 225.00 178.00 0 24 N 16.40 E .54 .14N .13E .05 285.00 285.00 238.00 0 36 N 15.50 E .33 .64N .27E .41 345.00 344.99 297.99 0 30 N 11.70 W .46 434.00 433.97 386.97 1 36 N 45.80 W 1.37 522.00 521.92 474.92 2 24 N 42.70 W .92 615.00 614.81 567.81 3 5 N 49.00 W .82 656.73 656.47 609.47 3 44 N 50.73 W 1.55 1.20N .30E .88 2.45N .67W 2.44 4.66N 2.80W 5.44 7.74N 6.01W 9.73 9.34N 7.92W 12.09 743.98 743.47 696.47 4 48 N 57.45 W 1.35 834.40 833.55 786.55 5 4 N 65.49 W .82 924.70 923.48 876.48 5 19 N 64.02 W .32 1014.37 1012.71 965.71 6 0 N 53.19 W 1.40 1107.59 1105.48 1058.48 5 17 N 51.17 W .79 13.11N 13.21W 18.04 16.81N 20.04W 24.72 20.30N 27.44W 31.52 24.94N 34.93W 39.34 30.55N 42.18W 47.89 1203.09 1200.61 1153.61 4 41 N 53.27 W .66 1298.56 1295.86 1248.86 2 58 N 52.52 W 1.79 1394.20 1391.40 1344.40 2 4 N 54.35 W .96 1489.39 1486.56 1439.56 0 57 N 45.79 W 1.20 1584.23 1581.39 1534.39 0 21 N 11.67 W .73 35.64N 48 . 74W 55 . 63 39.49N 53.84W 61.54 42 . 01N 57 . 21W 65 . 44 43.56N 59.18W 67 . 78 44 . 39N 59.80W 68 . 81 1678.98 1676.14 1629.14 0 14 N 4.51 W .12 1774.43 1771.59 1724.59 0 9 N 5.34 E .10 1869.71 1866.87 1819.87 0 5 N 67.79 E .14 1965.14 1962.30 1915.30 0 18 N 75.26 E .22 2060.15 2057.27 2010.27 2 43 N 75.36 W 3.14 44.87N 59.87W 69.27 45.20N 59.88W 69.55 45.35N 59.80W 69.63 45.44N 59.49W 69.55 46.07N 61.43W 71.09 2154.14 2151.04 2104.04 4 55 N 69.17 W 2.39 2216.60 2213.25 2166.25 5 16 N 68.72 W .55 2311.45 2307.67 2260.67 5 36 N 49.26 W 1.97 2406.83 2402.48 2355.48 7 15 N 14.19 W 4.37 2503.42 2498.06 2451.06 9 12 N 5.57 W 2.39 48.07N 67.36W 75.86 50.07N 72.54W 80.23 54.68N 80.11W 88.08 63.56N 85.12W 98.27 77.16N 87.37W 111.09 2599.50 2592.67 2545.67 10 48 N 10.21 W 1.86 2694.03 2685.11 2638.11 13 13 N 13.64 W 2.66 2789.52 2777.58 2730.58 15 40 N 21.67 W 3.32 2883.80 2867.98 2820.98 17 21 N 30.50 W 3.20 2979.38 2958.88 2911.88 18 38 N 30.20 W 1.34 93.68N 89.71W 126.47 112.91N 93.83W 145.08 135.52N 101.17W 168.25 159.48N 113.02W 194.89 184.97N 127.94W 224.42 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING POINT MciNTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 MWD SURVEY JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 3074.28 3048.21 3001.21 20 45 N 28.88 W 2.28 3169.58 3136.53 3089.53 23 20 N 31.36 W 2.88 3264.92 3223.01 3176.01 26 25 N 32.42 W 3.27 3360.65 3308.33 3261.33 27 30 N 35.64 W 1.90 3455.66 3391.58 3344.58 30 4 N 36.12 W 2.71 212.80N 143.69W 256.40 243.72N 161.'67W 292.16 277.77N 182.88W 332.27 313.72N 207.19W 375.60 350.78N 234.01W 421.18 3550.33 3472.33 3425.33 32 51 N 33.01 W 3.41 3646.19 3551.33 3504.33 36 7 N 31.22 W 3.56 3741.65 3627.97 3580.97 37 4 N 30.71 W 1.04 3836.68 3703.52 3656.52 37 36 N 30.24 W .64 3931.42 3777.61 3730.61 39 28 N 28.72 W 2.21 391.49N' 261.99W 470.48 437.47N 290.81W 524.74 486.27N 320.09W 581.65 535.95N 349.32W 639.28 587.34N 378.35W 698.28 4026.30 3849.61 3802.61 41 46 N 27.32 W 2.60 4121.90 3919.45 3872.45 44 21 N 25.47 W 3.01 4217.08 3986.54 3939.54 46 0 N 26.13 W 1.79 4313.20 4051.93 4004.93 48 14 N 26.37 W 2.34 4409.06 4114.65 4067.65 50 1 N 26.36 W 1.86 641.87N 407.35W 759.96 700.34N 436.34W 825.02 761.11N 465.73W 892.26 824.27N 496.88W 962.45 889.21N 529.06W 1034.70 4503.95 4174.37 4127.37 51 57 N 26.36 W 2.03 955.27N 561.80W 1108.18 4598.30 4231.34 4184.34 53 45 N 27.87 W 2.30 1022.19N 596.08W 1183.21 4693.32 4285.56 4238.56 56 39 N 30.91 W 4.02 1090.14N 634.39W 1261.19 4787.78 4335.15 4288.15 60 1 N 33.93 W 4.49 1157.96N 677.51W 1341.53 4882.80 4382.59 4335.59 60 4 N 34.21 W .26 1226.16N 723.63W 1423.74 4977.54 4430.35 4383.35 59 22 N 31.50 W 2.58 1294.87N 768.02W 1505.49 5072.55 4479.25 4432.25 58 39 N 31.59 W .76 1364.29N 810.63W 1586.94 5167.51 4528.37 4481.37 59 2 N 31.53 W .40 1433.54N 853.17W 1668.20 5262.41 4576.80 4529.80 59 35 N 30.08 W 1.44 1503.63N 894.95W 1749.81 5357.30 4625.02 4578.02 59 19 N 28.57 W 1.40 1574.87N 934.98W 1831.49 5452.60 4674.11 4627.11 58 40 N 29.33 W .97 1646.35N 974.51W 1913.12 5547.42 4722.88 4675.88 59 25 N 30.93 W 1.65 1716.67N 1015.33W 1994.42 5642.19 4771.39 4724.39 59 0 N 29.73 W 1.17 1786.93N 1056.44W 2075.83 5738.23 4821.31 4774.31 58 20 N 30.72 W 1.12 1857.82N 1097.74W 2157.86 5833.29 4871.38 4824.38 58 5 N 30.69 W .27 1927.30N 1139.00W 2238.67 5941.23 4928.72 4881.72 57 43 N 30..41 W .40 2006.06N 1185.48W 2330.11 6018.79 4970.63 4923.63 56 50 N 31.63 W 1.75 2061.98N 1219.11W 2395.36 6112.45 5022.27 4975.27 56 15 N 31.63 W .63 2128.51N 1260.09W 2473.50 6207.18 5074.30 5027.30 57 6 N 30.78 W 1.18 2196.21N 1301.09W 2552.65 6301.72 5124.64 5077.64 58 32 N 29.05 W 2.16 2265.56N 1340.98W 2632.65 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 MWD SURVEY JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6397.56 5174.36 5127.36 6493.12 5223.42 5176.42 6588.91 5272.60 5225.60 6683.30 5321.63 5274.63 6778.55 5370.06 5323.06 58 57 59 15 58 57 58 28 60 23 N 29.08 W .44 2337.18N 1380.79W N 28.46 W .64 2409.06N 1420.26W N 27.57 W .86 2481.63N 1458.86W N 28.14 W .72 2552.94N 1496.55W N 26.43 W 2.54 2625.81N 1534.13W 2714.54 2796.48 2878.57 2959.11 3040.94 6873.85 5417.22 5370.22 6969.85 5464.61 5417.61 7065.83 5511.91 5464.91 7163.01 5559.93 5512.93 7258.11 5606.62 5559.62 60 17 60 32 60 24 60 22 60 48 N 27.62 W 1.09 2699.58N 1571.75W N 29.16 W 1.42 2773.02N 1611.45W N 29.60 W .42 2845.79N 1652.42W N 30.40 W .72 2918.96N 1694.66W N 28.52 W 1.78 2991.09N 1735.40W 3123.56 3206.96 3290.44 3374.91 3457.72 7352.75 5653.42 5606.42 59 55 7446.92 5700.48 5653.48 60 6 7542.36 5747.81 5700.81 60 25 7638.11 5796.34 5749.34 58 39 7733.56 5845.93 5798.93 58 44 N 28.92 W 1.01 3063.23N 1774.93W N 29.77 W .81 3134.33N 1814.90W N 30.96 W 1.13 3205.83N 1856.79W N 33.58 W 3.00 3275.62N 1900.84W N 32.96 W .56 3343.81N 1945.58W 3539.92 3621.45 3704.32 3786.82 3868.31 7827.71 5894.89 5847.89 58 35 7922.81 5944.08 5897.08 59 5 8018.34 5992.70 5945.70 59 42 8112.43 6039.87 5992.87 60 6 8207.47 6088.17 6041.17 58 47 N 31.49 W 1.34 3411.83N 1988.46W N 30.10 W 1.36 3481.74N 2030.12W N 28.36 W 1.69 3553.49N 2070.27W N 27.67 W .76 3625.36N 2108.51W N 27.96 W 1.40 3697.75N 2146.69W 3948.71 4030.09 4112.27 4193.57 4275.30 8302.20 6137.19 6090.19 8397.17 6186.40 6139.40 8492.22 6236.05 6189.05 8588.15 6286.53 6239.53 8685.26 6337.91 6290.91 58 52 58 42 58 18 58 11 57 55 N 29.29 W 1.20 3768.90N 2185.53W N 30.'16 W .81 3839.44N 2225.80W N 30.06 W .42 3909.55N 2266.46W N 30.08 W .13 3980.15N 2307.33W N 30.94 W .80 4051.14N 2349.17W 4356.29 4437.50 4518.53 4600.10 4682.50 8780.01 6386.84 6339.84 59 52 8875.61 6435.09 6388.09 59 30 8971.97 6484.39 6437.39 58 57 9066.94 6533.65 6486.65 58 33 9161.54 6582.67 6535.67 59 1 N 30.49 W 2.09 4120.88N 2390.60W N 31.87 W 1.30 4191.49N 2433.32W N 32.16 W .64 4261.69N 2477.21W N 32.45 W .49 4330.32N 2520.61W N 31.87 W .72 4398.81N 2563.67W 4763.62 4846.15 4928.93 5010.10 5090.99 9257.16 6631.57 6584.57 59 27 9351.97 6679.53 6632.53 59 45 9446.91 6727.13 6680.13 60 4 9542.91 6775.36 6728.36 59 36 9637.62 6823.28 6776.28 59 35 N 31.00 W .91 4468.92N 2606.52W N 32.37 W 1.29 4538.50N 2649.48W N 29.42 W 2.71 4608.99N 2691.65W N 28.46 W .99 4681.62N 2731.81W N 27.67 W .72 4753.71N 2770.25W 5173.15 5254.92 5337.05 5420.00 5501.59 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 MWD SURVEY JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9732.96 6872.08 6825.08 58 49 9827.94 6921.58 6874.58 58 20 9923.72 6972.18 6925.18 57 51 10018.06 7022.59 6975.59 57 32 10112.48 7073.62 7026.62 57 0 N 29.91 W 2.17 4825.48N 2809.68W N' 30.09 W .53 4895.68N 2850.21W N 30.69 W .74 4965.82N 2891.34W N 30.97 W .41 5034.30N 2932.21W N 31.38 W .68 5t02.27N 2973.33W 5583.42 5664.47 5745.79 5825.53 5904.97 10207.42 7125.83 7078.83 56 16 10302.93 7178.43 7131.43 56 54 10397.88 7229.69 7182.69 57 44 10494.61 7280.52 7233.52 58 51 10589.11 7328.71 7281.71 59 48 10684.18 7377.14 7330.14 10778.69 7426.26 7379.26 10872.87 7476.14 7429.14 10970.30 7527.61 7480.61 11063.85 7576.94 7529.94 58 56 58 25 57 37 58 35 57 46 N 31.85 W .88 5169.79N 3014.90W N 32.09 W .69 5237.42N 3057.11W N 30.56 W 1.62 5305.69N 3098.65W N 30.87 W 1.19 5376.44N 3140.69W N 30.65 W 1.02 5446.28N 3182.26W N 31.32 W 1 10 5516.42N 3224.37W N 31.'34 W .54 5585.39N 3266.35W N 31.42 W .86 5653.59N 3307.95W N 33.47 W 2.04 5723.38N 3352.33W N 34.22 W 1.11 5789.40N 3396.59W 5984.26 6063.96 6143.87 6226.17 6307.45 6389.25 6470.00 654g.88 6632.56 6711.94 11159.94 7628.06 7581.06 11255.11 7679.08 7632.08 11349.83 7730.94 7683.94 11445.95 7783.54 7736.54 11540.79 7834.71 7787.71 57 56 57 13 56 23 57 15 57 25 N 34.90 W .62 5856.40N 3442.75W N 34.39 W .88 5922.49N 3488.42W N 34.66 W .91 5987.79N 3533.34W N 34.64 W .91 6053.97N 3579.08W N 33.58 W .96 6120.08N 3623.86W 6793.13 6873.30 6952.40 7032.69 7112.41 11635.99 7885.72 7838.72 57 47 11731.41 7937.07 7890.07 57 4 11825.70 7988.35 7941.35 57 2 11921.97 8040.06 7993.06 57 58 12017.13 8090.90 8043.90 57 25 N 30.31 W 2.92 6188.28N 3666.38W N 29.62 W .96 6257.95N 3706.54W N 30.63 W .90 6326.39N 3746.26W N 30.17 W 1.06 6396.43N 3787.35W N 30.43 W .63 6465.87N 3827.93W 7192.77 7273.17 7352.29 7433.49 7513.92 12112.58 8141.74 8094.74 58 12 12207.58 8192.39 8145.39 57 21 12303.08 8244.43 8197.43 56 35 12398.10 8296.87 8249.87 56 25 12493.63 8349.21 8302.21 57 8 N 31.14 W 1.04 6535.27N 3869.27W N 32.03 W 1.20 6603.73N 3911.36W N 33.07 W 1.22 6671.22N 3954.44W N 33.97 W .81 6737.28N 3998.20W N 33.32 W .94 6803.81N 4042.47W 7594.70 7675.06 7755.09 7834.25 7914.08 12590.19 8401.27 8354.27 57 36 12686.71 8452.84 8405.84 57 47 12750.50 8487.09 8440.09 57 15 12825.49 8527.97 8480.97 56 40 12921.47 8581.66 8534.66 55 17 N 34.50 W 1.14 6871.30N 4087.84W N 32.91 W 1.40 6939.17N 4133.11W N 33.98 W 1.64 6984.07N 4162.77W N 33.83 W .79 7036.25N 4197.84W N 34.40 W 1.53 7102.11N 4242.45W 7995.29 8076.77 8130.53 8193.31 8272.74 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 MWD SURVEY JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 13017.32 8637.16 8590.16 53 56 N 34.67 W 1.43 7166.48N 4286.75W 8350.72 13113.25 8694.81 8647.81 52 9 N 35.-04 W 1.88 7229.38N 4330.55W 8427.20 13208.34 8751.53 8704.53 54 35 N 35.11 W 2.56 7291.83N 4374.40W 8503.30 13303.36 8806.93 8759.93 54 4 N 34.72 W- .63 7355.13N 4418.58W 8580.31 13399.65 8864.33 8817.33 52 43 N 34.80 W 1.40 7418.64N 4462.65W 8657.44 13496.12 8923.43 8876.43 51 42 N 34.56 W 1.09 7481.33N 4506.03W 8733.'51 13592.64 8983.16 8936.16 51 50 N 33.32 W 1.02 7544.23N 4548.37W 8809.23 13686.93 9041.84 8994.84 51 10 N 33.58 W .75 7605.81N 4589.05W 8882.96 13782.88 9102.20 9055.20 50 51 N 33.54 W .32 7667.96N 4630.28W 8957.46 13877.73 9160.61 9113.61 53 6 N 33.34 W 2.38 7730.31N 4671.45W 9032.10 13949.36 9203.84 9156.84 52 37 N 34.33 W 1.29 7777.74N 4703.24W 9089.13 13985.00 9225.47 9178.47 52 37 N 34.33 W .00 7801.13N 4719.21W 9117.41 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 9117.49 FEET AT NORTH 31 DEG. 10 MIN. WEST AT MD = 13985 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 329.07 DEG. TIE-IN SURVEY AT SURFACE 0.00' MD PROJECTED SURVEY AT 13,985.00' MD SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION .00 .00 -47.00 1000.00 998.42 951.42 2000.00 1997.15 1950.15 3000.00 2978.42 2931.42 4000.00 3830.00 3783.00 .00 N .00 E .00 24.04 N 33.73 W 1.58 1.58 45.56 N 59.63 W 2.85 1.27 190.66 N 131.25 W 21.58 18.74 626.30 N 399.31 W 170.00 148.42 5000.00 4441.79 4394.79 6000.00 4960.36 4913.36 7000.00 5479.43 5432.43 8000.00 5983.45 5936.45 9000.00 6498.84 6451.84 1311.35 N 778.12 W 2048.58 N 1210.86 W 2795.95 N 1624.24 W 3539.56 N 2062.75 W 4282.02 N 2490.00 W 558.21 388.21 1039.64 481.43 1520.57 480.92 2016.55 495.98 2501.16 484.61 10000.00 7012.90 6965.90 11000.00 7543.09 7496.09 12000.00 8081.68 8034.68 13000.00 8626.96 8579.96 13985.00 9225.47 9178.47 5021.23 N 2924.37 W 5744.52 N 3366.31 W 6453.43 N 3820.62 W 7154.96 N 4278.78 W 7801.13 N 4719.21 W 2987.10 485.95 3456.91 469.81 3918.32 461.41 4373.04 454.72 4759.53 386.49 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA iPAGE 7 SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -47.00 47.00 47.00 .00 147.00 147.00 100.00 247.00 247.00 200.00 347.01 347.00 300.00 .00 N .00 N .10 S .29 N 1.22 N .00 .00 .03 .18 .30 E .00 E .00 .00 E .00 .00 E .00 .00 E .01 .00 447.03 447.00 400.00 547.10 547.00 500.00 647.24 647.00 600.00 747.52 747.00 700.00 847.90 847.00 800.00 2.70 N .93 W .03 .02 5.43 N 3.51 W .10 .07 8.95 N 7.44 W .24 .14 13.27 N 13.46 W .52 .28 17.30 N 21.12 W .90 .38 948.32 947.00 900.00 1048.85 1047.00 1000.00 1149.29 1147.00 1100.00 1249.62 1247.00 1200.00 1349.76 1347.00 1300.00 21.26 N 27.09 N 32.94 N 37.84 N 41.04 N 29. 37. 45. 51. 55. 41 W 1.32 .42 82 W 1.85 .53 16 W 2.29 .44 68 W 2.62 .33 87 W 2.76 .14 1449.83 1447.00 1400.00 1549.84 1547.00 1500.00 1649.84 1647.00 1600.00 1749.84 1747.00 1700.00 1849.84 1847.00 1800.00 43.09 N 44.19 N 44.75 N 45.13 N 45.34 N 58. 59. 59. 59. 59. 69 W 2.83 .06 76 W 2.84 .01 86 W 2.84 .00 88 W 2.84 .00 82 W 2.84 .00 1949.84 1947.00 1900.00 2049.87 2047.00 2000.00 2150.09 2147.00 2100.00 2250.49 2247.00 2200.00 2350.98 2347.00 2300.00 45.42 N 45.96 N 47.95 N 51.20 N 57.71 N 59. 61. 67. 75. 82. 56 W 2.84 .00 01 W 2.87 .02 03 W 3.09 .22 44 W 3.49 .41 66 W 3.98 .49 2451.72 2447.00 2400.00 2553.02 2547.00 2500.00 2654.90 2647.00 2600.00 2757.82 2747.00 2700.00 2861.84 2847.00 2800.00 69.16 N 85.20 N 104.28 N 127.71 N 153.85 N 86. 88. 91. 98. 109. 47 W 4.72 .74 23 W 6.02 1.30 75 W 7.90 1.88 26 W 10.82 2.93 83 W 14.84 4.02 2966.84 2947.00 2900.00 3072.99 3047.00 3000.00 3181.00 3147.00 3100.00 3291.71 3247.00 3200.00 3404.50 3347.00 3300.00 181.51 N 212.41 N 247.61 N 287.83 N 330.49 N 125. 143. 164. 189. 219. 92 W 19.84 5.00 47 W 25.99 6.15 06 W 34.00 8.01 28 W 44.71 10.71 27 W 57.50 12.79 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3520.32 3447.00 3400.00 3640.83 3547.00 3500.00 3765.50 3647.00 3600.00 3891.80 3747.00 3700.00 4022.80 3847.00 3800.00 378.08 N 253.12 W 434.78 N 289.18 W 498.63 N 327.43 W 565.30 N 366.24 W 639.80 N 406.28 W 73.32 15.82 93.83 20.51 118.50 24.66 144.80 26.30 175.80 31.00 4160.44 3947.00 3900.00 4305.80 4047.00 4000.00 4459.55 4147.00 4100.00 4625.08 4247.00 4200.00 4811.49 4347.00 4300.00 724.67 N 447.93 W 819.33 N 494.42 W 923.95 N 546.27 W 1041.30 N 606.39 W 1175.00 N 688.98 W 213.44 37.63 258.80 45.36 312.55 53.75 378.08 65.53 464.49 86.41 5010.24 4447.00 4400.00 5203.74 4547.00 4500.00 5400.37 4647.00 4600.00 5594.78 4747.00 4700.00 5787.15 4847.00 4800.00 1318.86 N 782.72 W 1460.03 N 869.40 W 1607.40 N 952.69 W 1751.66 N 1036.22 W 1893.61 N 1119.00 W 563.24 98.75 656.74 93.50 753.37 96.63 847.78 94.41 940.15 92.37 5975.47 4947.00 4900.00 6156.97 5047.00 5000.00 6344.59 5147.00 5100.00 6539.25 5247.00 5200.00 6732.12 5347.00 5300.00 2031.03 N 1200.14 W 2160.03 N 1279.50 W 2297.54 N 1358.75 W 2443.92 N 1439.15 W 2589.78 N 1516.09 W 1028.47 88.32 1109.97 81.50 1197.59 87.62 1292.25 94.66 1385.12 92.87 6934.06 5447.00 5400.00 7136.85 5547.00 5500.00 7339.95 5647.00 5600.00 7540.72 5747.00 5700.00 7735.62 5847.00 5800.00 2745.80 N 1596.27 W 2899.35 N 1683.15 W 3053.53 N 1769.57 W 3204.60 N 1856.06 W 3345.28 N 1946.54 W 1487.06 101.94 1589.85 102.79 1692.95 103.10 1793.72 100.77 1888.62 94.90 7928.50 5947.00 5900.00 8126.73 6047.00 6000.00 8321.19 6147.00 6100.00 8513.06 6247.00 6200.00 8702.38 6347.00 6300.00 3485.96 N 2032.57 W 3636.34 N 2114.26 W 3783.08 N 2193.48 W 3924.90 N 2275.34 W 4063.59 N 2356.63 W 1981.50 92.88 2079.73 98.23 2174.19 94.46 2266.06 91.87 2355.38 89.33 8899.09 6447.00 6400.00 9092.54 6547.00 6500.00 9287.53 6647.00 6600.00 9486.71 6747.00 6700.00 9684.41 6847.00 6800.00 4208.67 N 2444.00 W 4348.75 N 2532.33 W 4491.34 N 2619.99 W 4639.04 N 2708.56 W 4789.38 N 2789.07 W 2452.09 96.70 2545.54 93.46 2640.53 94.99 2739.71 99.18 2837.41 97.71 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING POINT McINTYRE / P2-40 500292283700 NORTH SLOPE BOROUGH COMPUTATION DATE: 1/ 8/98 DATE OF SURVEY: 122097 JOB NUMBER: AKMM80039 KELLY BUSHING ELEV. = 47.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9876.34 6947.00 6900.00 4931.30 N 2870.88 W 2929.34 91.93 10063.52 7047.00 7000.00 5067.17 N 2951.96 W 3016.52 87.18 10245.57 7147.00 7100.00 5196.75 N 3031.65 W 3098.57 82.05 10430.30 7247.00 7200.00 5329.30 N 3112.59 W 3183.30 84.74 10625.45 7347'.00 7300.00 5473.29 N 3198.27 W 3278.45 95.14 10818.30 7447.00 7400.00 5614.21 N 3283.90 W 3371.30 92.85 11007.48 7547.00 7500.00 5749.83 N 3369.83 W 3460.48 89.18 11195.62 7647.00 7600.00 5881.20 N 3460.05 W 3548.62 88.14 11378.84 7747.00 7700.00 6007.66 N 3547.08 W 3631.84 83.22 11563.65 7847.00 7800.00 6136.22 N 3634.39 W 3716.65 84.81 11749.67 7947.00 7900.00 6271.28 N 3714.12 W 3802.67 86.02 11935.07 8047.00 8000.00 6406.03 N 3792.93 W 3888.07 85.39 12122.56 8147.00 8100.00 6542.53 N 3873.66 W 3975.56 87.49 12307.74 8247.00 8200.00 6674.48 N 3956.56 W 4060.74 85.18 12489.56 8347.00 8300.00 6800.96 N 4040.59 W 4142.56 81.82 12675.75 8447.00 8400.00 6931.38 N 4128.07 W 4228.75 86.19 12860.14 8547.00 8500.00 7060.30 N 4213.95 W 4313.14 84.39 13034.04 8647.00 8600.00 7177.60 N 4294.44 W 4387.04 73.91 13200.52 8747.00 8700.00 7286.61 N 4370.73 W 4453.52 66.48 13371.03 8847.00 8800.00 7399.94 N 4449.66 W 4524.03 70.51 13534.14 8947.00 8900.00 7505.90 N 4522.96 W 4587.14 63.11 13695.16 9047.00 9000.00 7611.15 N 4592.59 W 4648.16 61.02 13855.07 9147.00 9100.00 7715.16 N 4661.48 W 4708.07 59.90 13985.00 9225.47 9178.47 7801.13 N 4719.21 W 4759.53 51.46 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD {FROM MINIMUM CURVATURE) POINTS r'l I:t I I_1_ I ~ G WELL LOG TRANSMITTAL To: State of Alaska January 14, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Drive. Anchorage, Alaska 99501 ~'~.?,, --- 5 ~_~i~ ~Oc>r~.\~..~ MWD Formation Evaluation Logs - P2-40, AK-MM-80039 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, gG, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22837-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company C:] I~ I I_L.. I IM ~ S E F~L/I C:: E S WELL LOG TRANSMITTAL To: State of Alaska January 14, 1998 Alaska Oil and Gas ConserVation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs P2-40, AK-MM-80039 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P2-40: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22837-00 1 Blueline 1 Folded Sepia 2" x 5" TVD Resistivity & Gamma Ray Logs' 50-029-22837-00 1 Blueline 1 Folded Sepia 2" x 5" MD Neutron & Density Logs' 50-029-22837-00 1 Blueline 1 Folded Sepia 2" x 5" TVD Neutron & Density Logs: 50-029-22837-00 Blueline Folded Sepia .'~ .... -,-.,. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 0 I:! I I--I--I ~ G S ~:: !:t ~./I r' E S 13-Jan-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well P2-40 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD n/a' MD 13,985.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company TONY KNOWLE$, GOVERNOFI ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 December 4, 1997 Steve Shultz Senior Drilling Engineer ARCO Alaska. Inc. POBox 196612 Anchorage, AK 99519-6612 Re: Point McIntyre P2-40 ARCO Alaska, Inc. Permit No: 97-226 Sur. Loc.: 328'SNL, 3955'WEL, Sec. 14, T12N, R14E, UM Btmhole Loc: 3045'SNL, 3366'W~EL, Sec. 03, T12N, R14E, UM Dear Mr. Shultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Your request for a diverter variance has been approved. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607 . . Chairman ~ BY ORDER OF THE COMMISSION dl f/enc los ures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmentalt Conservation w/o encl. STATE OF ALASKA ALASKA ~..,~ AND GAS CONSERVATION COM.~,;SSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work I~ Drill [] Redrill tlb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan RTE = 47.4' Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 034622 j 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 328' SNL, 3955' WEL, SEC. 14, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 3341' SNL, 3174' WEL, SEC. 03, T12N, R14E, UM P2-40 ~ At total depth 9. Approximate spud date Amount $200,000.00 3045' SNL, 3366' WEL, SEC. 03, T12N, R14E, UM 12/05/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 312809, 3045'I P2-41,5.68' at 496' 2560 12940' MD / 9208' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 350' Maximum Hole Angle 58° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4400 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 133# H-40 BTC 80' 45' 45' 125' 125' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 6050' 44' 44' 6094' 4947' B73 sx CS III, 594 sx 'G', 979 sx CS III 8-1/2" 7" 26# L-80 BTC-Mod 12220' 43' 43' 13242' 8793' See Below 8-1/2" 7" 29# 13Cr NSCC 724' 13242' 8793' 13966' 9194' 250 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production Liner RECEIVED ORI61N L Perforation depth: measured true vertical N~jl, 0ii & Ga~ ~ns. Anchorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greg Hobbs, 564-4191 Prepared By Name/Number: Terrie Hubble, 564-4628 21.1 hereby certify that the fi~rlegoing isCrCe an/(I ,correct to the best of my knowledge Signed~,~- SteveShultz ~'/~i"W~V ~ Title Senior Drilling Engineer Date II-/ / Commission Use Only Number IAPINumbe, I ^ 'ova'a to I See cover letter Permi_lt~ 7'"" ~,~ ,~. ~ 50- 0¢~ c~ _ ~ ~ 2/~-~,~---' ¢"~ for other requirements Conditions of Approval: Samples Required []Yes []'No Mud Log Required []Yes Hydrogen Sulfide Measures ~'Yes [] No Directional Survey Required []Yes []No Required Working Pressure for BOPE []2M; []3M; [~,SM; I--I10M; []15M Other: by order of Approved By Commissioner the commission Date/o'~- ~-- Form 10-401 Rev. 12-01-85 Submit In Triplicate -. I Well Name: I P2-40 I Type of Well (producer or injector): [Producer I Surface Location: 328' FNL, 3955' FEL, T 12N, R 14E, S 14 Target Location: 3341' FNL, 3174' FEL, T 12N, R 14E, S 3 Bottom Hole Location: 3045' FNL, 3366' FEL, T 12N, R 14E, S 3 I AFENumber: 12B0217 I ling: I DOYON 14 I I Estimated Start Date: 112/05/97 I I Days to complete 120 [ l MD: 112940' I TVD: 19208' [RTE: 147.4 I Well Design (conventional, slimhole, etc.): I Ultra-Slimhole 7" Longstring, 3-1/2" L-80 tbg I Formation Markers: E D Formation Tops MD TVD I~ !: L 12 ] ¥' Base of Permafrost 1784 1782 SV1 (T3) 5585 4677 ~£~; .. z~ i~: 9 5/8" Casing Point 6094 4947 9-5/8" cs# shoe below SV1 & above K£15 K15 (Ugnu) 6936 5107 Aia~ka Oil & a.~,h~,,~0a~ Cons. ¢ West Sak 9821 6922 9.5 ppg minimum mud weightreqmrea.'~' .... v~u~ K-10 13347 8851 9.6-9.9 EMW to this depth. 3% 10.3 ppg KC1 GEM System at 500' ABOVE K-10. HRZ 13365 8861 K-5/HRZ same depth Kalubik 13437 8901 Kupamk 13542 8959 OWC 13826 9116 TD 13966 9194 7" casing shoe. 140' MD below OWC. 10.6 ppg IF Miluveach is penetrated. Casing/Tu ~ing Program: Hole ~ize Csg/Tbg Wt/Ft Grade Conn Length Top Btm O.D. MDfrVD MDfrVD 30" 20" 133# H40 BTC 80' 45/45' 125'/125' 12 1/4" 9 5/8" 40# L-80 BTC-Mod 6050' 44/44' 6094'/4947' 8 1/2" 7" 26# L-80 BTCM / NSCC 12220' 43/43' 1324278793' 7" 29# 13 CR 724' 13242'/8793' 13966'/9194' Tubing 3 1/2" 9.2# L-80 NSCT 13400' 42'/42' 13442'/8903' Mud Program: Surface Mud Properties: Spud I 12 1/4" hole Density (ppg) ~unnel Vis Yield Point 10 sec gel 10 rain gel pH 8.7-9.5 ~ 100-300 30-70 20-60 40-80 9-10 Fluid Loss 15 -25cc Production Mud Properties: LSND I 8 1/2" hole section Density(ppg) Funnel Vis I Yield Point I 10 sec gel I ,0 mia gel 8.8-9.9 40-55 18-22 5-15 < 30 pH Fluid Loss 9.0-9.5 4-6cc Production Mud Properties: 3% KCL Density (ppg) Plastic Vis I Yield Point 10.3-10.6 8-15 I 15-25 8-1/2" hole section, GEM 10 sec gel I 10 min gelI8-15 <30 pH Fluid Loss 9.0-9.5 <5cc Cement Data: Casing First Stage: Second Stage: Comments Sxs/Wt/Yield Sxs/Wt/Yield 9-5/8" surface Coldset III: 979/12.2/1.92 Two stage job: casing 673/12.2/1.92 (assumes 200% First stage Coldset HI lead to 6094'. excess in permafrost) from 2000'-4750' @ 50% ES cementer Class G: excess followed by Class G @ at 2000' 594/15.8/1.15 tail from shoe to 4750' (750' MD. TVD) @ 50% excess + 120' shoe. Second stage Coldset HI circulated to surface. Casing/Liner Lead:Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments 7" none 250/15.8/1.15 Class "G". Volume based on cement to 1000' above the Kuparuk with 50% excess + 120' shoe. Logging Program: Open Hole Logs: ICased Hole Logs: 12 1/4" MWD/multi-shots as directional survey. MWD/LWD GR/RES to 500' above K-10. MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD RFT's and Fluid Samples may also be required. CBT-CET (contingent on cmt job mechanics). Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: KOP: 350' MD 58 degrees Maximum Hole Angle: Close Approach Well: : P2-07 14.21' Allowable Deviation at 3460' (SI) P2-41 5.68' Allowable Deviation at 496' (SI) P2-51 31.01' Allowable Deviation at 1879' (SI) P2-58 34.39' Allowable Deviation at 2558' (SI) Drilling and Completion Scope 1. 2. 3. 4. o 6. 7. 8. Move rig to P2-40. NU riser and flowlines. Diverter waived. Drill 12 1/4" surface hole to ~ 6094' MD. Run and cement 9 5/8" casing. Cement to surface. Drill 8-1/2" production hole with MWD DIR/GR RES to 500' MD above the K-10. Triple Combo and Bit. Swap to 10.3 PPG 3% KC1/GEM system. Drill 8-1/2" production hole to 13966' MD. Run/cement 7" long string. Run 3-1/2" L-80 tubing with 7"x3-1/2" packer, 31/2" SSSV, and 3-1/2"x1" GLMs. Secure well, RDMO. POOH for LWD Drilling Hazards/Contingencies · The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is 4400 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The 10.3 ppg mud will overbalance the anticipated pressure by 300 psi. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA balling Gumbo problems. · Coal stringers in the lower Ugnu have caused stuck pipe. This occurred on P2-25. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH 12/03/97 TREE: 4-t/16"-5M Chrome RT-GL = 3 WELLHEAD: 1' X11"-5M FMC r,l~--~,~U GL-SL= Gen 5 Type 9-5/8",40#/ft, L-80 16094'1 I I BTC 3-1/2" BAL-O I 2000 IKOP: 350' MAX ANGLE: 58° @ 4377' MD 3-1/2" 12.6# L-80 NSCT TUBING TUBING ID: 2.992" CAPAC TY: 0.0087 BBL/FT PERFORATION SUMMARY: Ref Log: Size Interval I SPF Open/Sqzd tbd 7", 26 & 29 #/ft, L-80 Mod BTC / 13CR NSCT (3A~ LIP I MANL)HbL~ (Camco 3~I/2xl"KGB-2-LS") N-° MD(BKB) TVDss 1 tbd 5 40' MD above 6 packer 13242' shoe at I 13966' ] 7' Packer,9Cr 13412' 3-1/2" 'X' Nipple 3-1/2" 'XN' Nipple 3-1/2" WLEG 13442' MARKER JOINT (20') ABOVE KUPARUK BUT BELOW "FF. DATE REV. BY COMMENTS 12/3/97 GH PLANNED COMPLETION Point IVlclntyre WELL: P2-40 APl NO: 50-029- Shared Services Drilling 12/83/1997 16:26 90756372? SPERRY-SUN PAGE 82 Jn Shared Services Drilling DrillQuest' 2O00 /.KOP: Start DIr O 1.000*/100ft: 3$0,00ft MD, 3$0,00ft TVD 400.00 .°°End Dir0 Salt O 0,O00' ' 950oOOft MD, 948,90ft 'rvD -~ Stan DIr @ 1,000°/100ft; 1000,00It MD, 898,63/t 'lWD 1200.00 //End Dir, .~11 @ 0.000': 1600.0011 MD, lS0?.l~ff TVD 1500.00 /Start Dir ~ 2.000°/~00ft · 2044.27ft MD~ 2041.BOlt TVD '2000.00 Increase 0 3.000°/100fl; 2844,27ft MD, 2831.44ft TVD Rate Decrease O 1,000VJ00(t: M00.~_ff MD, ..-.-.-.-.-.-.-.-.-~a. BOft TVD DIr Rate Increase O 3,000°llOOft: 3500,93ft MD, 3421,42ft TVD 4000.00 Df r, ,.q~lt · B7,905': 431'7,4Sf~ MD, 403"/.42fl TVD ...... R,~/JE .Gneiug .-. ~9~ AZ MD, .4¢A7. ~0.T3/D ......................................... 0 lO00 2000 .1000 dO(X) 5000 ' ................................ ~0 ~m~a~: 13ffi~MDI ~O,~D 0~8 ffi E, 6~ffi ffi N ~l~l ! [Drh = t~ ~t.~t__ _~ ......... ~ A~ ~.~ ~. Shared Services Drilling Point Mclntrye (~) Incl. Azim. Sperry-Sun Drilling Services Vertical Local Coordirmtes Depth Northly Fastings {~) {~t) 0.00 0.000 0,000 .-47.40 0.00 100.00 0.000 0.000 52.60 t00.00 200.00 0.000 0.O00 1S2..60 200.00 300.00 0.000 0.000 2.52.60 300.00 350.00 0.000 0.000 302.60 350.00 44X).00 0.500 300.000 352.60 700.00 3.500 300.000 652.38 6.~.78 800.00 4.500 300.000 752.14 799.54 900.00 5.500 300.000 851.76 899. ! 6 950.00 6.000 300.000 gO1.50 948.90 1000.00 6.000 300.g,O0 951.23 998.63 1 I00.00 5.{300 31N).O00 1050.77 1098.17 1200.DO 4.000 300.000 1150.46 1197.86 1300.00 3.0(10 30,0.000 1250.27 1297.67 1400.00 2.000 300.000 1350.17 1397.57 1500.00 1.000 300.000 1450.14 1497.54 1600.00 0.000 0.000 1550.13 1597.53 1700.00 0.000 O.OOO 1650.13 1697.53 1784.:27' 0.000 0.000 1734.40 1781.80 1784.87 0.0(]0 0.000 1735.00 1782.40 1800.00 0.0~0 0.000 1750.13 1797.53 1900.00 0.000 O.OOO 1850.13 1897.53 2000.00 0.068 0.000 I g50.13 1997.53 2044..27 0.000 O.O00 19g4.40 2.041 2:100.00 1.115 330.000 2050.13 2'097.53 2200.00 3.l 15 330.000 2150.06 2197.46 2300.00 5.115 330.{XX3 2.249.79 2297.19 2400.00 7.115 330.000 2349.22 :2396.62 Proposal Report for P2-40 - P2-40 Wp2 FOR PERMITTING ONLY 0.00 N 0.00 E 0.00 N O.00 E 0.OO N 0.00 E 0.00 N 0.00 E 0.gO N 0.00 E 0.11 N 0.19W 0,98 N 1.70 W 2.73 N 4.72 W 5.34 N 9.26 W 8.83 N 15.30 W f3.19 N 22.8,~ W 15.69 N 27.18 W 18.31 N 31,71 W 23.10 N 40.01 W 27.02 N 46.80 W 30.07 N 52.09 W 32.28 N 55.87 W 33.58 N 58.13 W 34.00 N 58.89 W 34.00 N 58.89 W 34.00 N 58.89 W 34.00 N 58,89 W 34.00 N 58.89 W 34.00 N 58.89 W 34.00 N 58.89 W 34.00 N 58.89 W 34~t7 N 59.16 W 37.b-'7 N 61.01 W 43.88 N 64.59 W 53.10 N 69.92 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (fi) (°,OOft) 599825523 N 681568.82 E 599625523 N 681588.82 E 0.000 0.gO 599825523 N 681568.82 E 0.000 0,00 599825523 N 681568.82 E 0.000 0,00 5998255.23 N 681568.82 E 0.000 0.00 5998255.33 N 681568.63 E 1.(~O 0.19 5998256.17 N 68~567.10 E 1.000 1.72 5998257.84 N 681564.03 E 1.000 4.77 59'38260.35 N 681559.44 E !.000 9.34 59982~.~ N 681553.31 E !.000 15.44 5998267.86 N 681545.66 E 1.000 23.06 5998270:25 N 681541.26 E 1.000 27.43 59962'/2.76 N 681536.68 E 0.0130 32_t30 599e277.35 N 68 1528.26 E 1.000 40.38 5998281.11 N 681521.37 E 1.000 47.24 5998284.03 N 681516.01 E 1.000 52.57 5998286.12 N 681512.18 E 1.04)O 56.,99 5998287,37 N 68t509.89 E 1.000 58:67 599B287.79 N 881509.12 E 1.000 59.44 5998287.79 N 681509.12 E 0.000 59.44 5998287.79 N 681509.12 E 0.000 59~4 5998287.79 N 681509.12 E 0.000 59.44 599~:87.79 N 681509.12 E O.000 59.44 5998287.79 N 681509.12 E 0.000 59.44 5990287.79 N 681509.12 E 0.000 59.44 5998287.79 N 681509.12 E 0.000 59.44 5998288.25 N 681508.84 E 2.000 59.:~8 5998291.40 N 681506.92 E 2.000 63.67 5998297.53 N 681503.18 E 2.000 70.84 5998306.62 N 681497.63 £ 2.000 81.49 Alaska State Plane Zone 4 Point Mclntym Pad 2 Comment KOP: Staff Dk 13 1.000°1100R: 350.~ MD, 350.001t TVD End Dir, Sail ~3 6.000°' 950.00ft MD, 948.90ft TVO Sla[t DIf @ 1.000°/10Oft: 10~O.0Oft MD. 968.6311TVD End DIL Sail O 0.000°: 1600.O0fl MD, 159r'/.5atl TVD Start Dir @ 2.000°/lOOft: 2044.27ft MD, 2041.8011 TVD Continued... 3 December, 1997- 13:35 - 1 - Dri#Ouest w Shared Services Drilling Point Mcintrye Measu~d (fl) Depth (It) Vertical (It) 2500.00 9.1:15 330.000 24.48.21 2495.61 2600.00 11.115 330.000 2546.66 2594.06 2700.00 13.115 330.04:N~ 2644.42 2691.92 2800.00 15.115 330.000 2741.40 2788 2844.27 16.000 330.01~ 2784.04 2831.44 29~0.00 17.672 3,30.~ 2837.39 2884.79 3000.00 20.672 330.0DO 2931.83 2979.:23 3100.00 23.672 ,.%30.0iX) 3024.42. 3071.82 3200.(~3 26.672 330.000 3114.92 3162.32 3400.{X} 32.672 330.000 32S8.61 3,':'~6.01 3400.93 32.700 330.000 3289.40 3336.80 3500.00 31.709 330.000 3373.22 3420.62 3500.~ 31.700 330.000 3374.02 3421.42 3600.00 34.672 330.044 345G.~ 3504.32 $7{~.00 37.672 330.08 ! 3537.63 3585.03 3800.00 40.672 330.114 3615.15 3662.55 3873.56 42.878 330.136 3670.00 ,3717.40 3900.00 43.672 330.143 3689.25 3736.65 4050.00 46.672 330.170 3759.74 3807.14 4100.00 49.672 330.193 3826.43 3873.83 4200.00 52.672 330.?_15 3889.12 3936.52 4300.00 55,672 330.235 3947.65 3995.05 4377.45 57.995 330.249 3~.02 4037.42 4396.29 57.995 330.2.49 4~0.00 4047.40 44~0.00 57.995 330.249 4001.97 4049.37 4500.{~3 57.995 330.249 4054.97 4102.37 4500.00 57.995 330.249 4107.97 4155.37 4700. DO 57.995 330.249 4160.97 4208.37 4800.00 57.995 330.249 4213.96 4261.36 Sperry-Sun Drilling Services Proposal Report for P2-40- P2-40 Wp2 FOR PERMJTI'(NG ONLY Local Coordinates Nothings Easlings (fl) (fi) 65.33 N 76.98 W 80~54 N 85.76 W 98.71 N 96.25 W 119.83 N 108.44 W 130.11 N 114.38 W 144.09 N 122.45 W 17253 N 138.87 W 205.21 N 157.74 W 242.04 N 179.00 W 282.92 N 202.60 W 327.74 N 228.48 W 328.18 N 228.73 W 373.90 N 255.13 W 374.32 N 255.38 W 421.29 N 282.47 W 472.43 N 311.92 W 527.18 N 343.40 W 569.67 N 367.81 W 585.39 N 376.84 W 646.9D N 412.12 W 711.54 N 449.17 W 779.14 N 487.68 W 849.50 N 528.14 W 905.78 N 560.3! W 919.65 N 568.24 W 922.39 N 569.80 W 996.01 N 611.88 W ~ 069.63 N 653.96 W I 143.25 N 696.04 W 1216.88 N 738.12 W Global Coordinales Dogleg Northings Easlings Rate (fi) (fi) ("/lOOft) 5998318.67 N 681490,28 E 2.0~ 5998333.66 N 681481.13 E 5998351.57 N 681470.20 E 2.000 5998372,39 N 681457,,50 E 2.00,0 59983,92.52 N 681451.31 E 2.000 5998396.30 N 681442.91 E 3.000 5996424.33 N 661425.80 E 3.000 5996456.54 N 681406.15 E 3.000 599S492.85 N 681383.99 E 3.000 5998533.1~ N 681359.40 E 3.000 5998577.32 N 68~332.44 E 3.000 5998577.75 N 681332.18 E 3.000 5998622.82 N 681304.68 E 1 5998623.24 N 681304.42 E 1.0~ 5998669.53 N 681276.20 E 3.000 5998719.94 N 681245.52 E 5998773.91 N 68~212.71 E 5998815.79 N 681187.28 E 3.000 5998831.29 N 681~77.87 E 3.000 5998891.93 N 681141.10 E 5998955.65 N 681102.49 E 3.005 599~022.28 N 681062.15 E 5999091.65 N 681020.20 E 3.000 5999147.13 N 680986.67 E 3.000 5999160.80 N 680978.40 E 0.000 5990163.50 N 680976.77 E 0.000 5999236.08 N 680932.92 E 0.000 5999308.66 N 680889.05 E 0.0O0 5999381.23 N 680845.21 E 0.000 5999453.81 N 680601.35 E 0.000 Vertical Section (it) 95.60 113,16 134.15 158.53 170.40 186.54 219.37 257.10 299.62 346.82 398.57 399.0~ 451.87 506.57 565.57 628.72 677.71 595.64 7~.74 841 919.11 10C)0.16 I064.97 1080.e5 1084.09 1168.87 1253.66 1338.44 1423.22 Alaska State Plane Zone 4 Point Mclntyre Pad 2 O~r Rate Increase O 3.(X)0°/100ft* 2844.271t MD, 2831.44ft TVD Dtr Rate Decrease ~ 1.000°llO0ft: 3400.93ff MD, 3336.801t TVD Dlr Rate Increase @ 3.000°!1001t- 3500.93ff MD, 3421.421t TVD SV4 End Dir, Sail {~ 57.9~5°: 4377.45ft MD, 4037.421t 'I'VD Top Stuck Pipe Zone 3 December, 1997- 13:35 - 2 - OriflQuest w o_ Sperry-Sun Drilling Services Proposal Report for P2-40- P2-40 Wp2 FOR PERMITTING ONLY z I Shared Services Drilling Point Mclntrye Measured Incl. Azim. Sub-Sea D~ Vertk~ Lo¢~ Coordinates Depth Northi~ Easlings 4900.00 57.995 330.249 4266.~ 4314.36 54:}00.00 57.995 3,.'.'.'~.249 4319.96 4367.36 5100.00 57.995 330.249 4372.96 4420.36 5200.~0 57.995 330.249 4425.96 4473.36 5400.00 57.995 330.249 4531.96 4579.~1~ 5500.00 57.995 330.249 4584.~ 4632.36; 5584.98 57.995 330.249 4630.00 4677.40 5600.00 57.995 330.249 4637.96 4685.36 5700.0~ 57.995 330.249 4690.96 4738.36 5800.00 57.995 330.249 4743.96 4791 5900.00 57.995 330.249 ,t7cJ6.96 4844.36 5~O5.74 57.995 330.249 4800.00 4847.40 6000.00 57.9~5 330.249 4849.96 4897.36 6094.42 57.995 330.249 4900.00 4947.40 6100.00 57.995 350249 4902.96 4950.~ 6396.3I 57.995 330.249 5060.00 5107.40 6400.00 57.995 330.249 ,5~61.95 5109.36 6500.00 57.995 330.249 51 t4.95 5162.35 6600.00 57.995 330.249 5167.95 5215.35 6700.00 57.995 330 '~49 5220.95 5268.35 6800.00 57.995 330.249 5273.95 5321.35 6900.00 57.995 330.249 5326.95 5374.35 7{)00.00 57.9°~5 330.249 5379.95 5427.35 71 00.00 57.995 330.249 5432.95 5480.35 7200.(X} 57.995 330.249 5485.95 5533.35 7300.00 57.995 330.249 5538.95 5586.95 7400.00 57.995 330. 249 5591.95 5639.35 1290.50 N 78O.2O W 1364.12 N 822.28 W 1437.75 N 864.36 W ~51 !.37 N 906.44 W 1584.99 N 948.52 W 1658.61 N 990.60 W 1732.24 N 10~2.68 W 1794.80 N 1058.44 W 1805.86 N 1074.76 W 1879.48 N 1116.84 W 1953.11 N 1158.92 W 2026.73 N '~ 201.00 W 2030.96 N 1203.42 W 2 103.35 N 1243.08 W 2169.87 N 1282.81 W 2173.98 N 128~5.l 6 W 2247.60 N 1327.24 W 2321.22 N 1369.32 W 2392.13 N 1409.85 W 2394.84 N 1411.40 W 2468.47 N ! 453.48 W 2542.09 N 14,95.56 W 2615.71 N 1537.64 W 2689.34 N 1579.72 W 2762.96 N 1621.80 W 2836.58 N 1665.85 W 2910.21 N 1705.96 W 2983.83 N ~ 748.04 W 3057.45 N t790.12 W 3131.07 N 1832.20 W Global Coordinales Dogleg Vertic~d Northhlgs Ea~ngs Rate Section (ft) (it) ('/lOOft) (fi) 5G99525.39 N 680757.49 E 0,000 150~.00 5999598.97 N 680713.64 E 0.000 ! 592.78 5999671.55 N 680669.78 E 0.000 ! 677.57 5999744.13 N 680625.92 E 0.000 1762.35 5999616.71 N 680582.07 E 0.000 1647.13 5999689.29 N 680638.21~ E 0.1XX) 1931.91 5999961.87 N 680494~ E 0.000 2016.63 6000023.54 N 68~157.09 E 0.OIX) 2088.74 6000034.44 N 680450.50 E 0.O00 2101.48 6000107'.02 N 680406.64 E 0.000 2186.26 6000179.60 N 680362.79 E 0.000 2271.04 6000252.18 N 680318.93 E 0.000 2355.82 6D00256.35 N 680316.41 E 0.000 2360.6~ 6000324.76 N 680275.07 E 0.000 2440.6l 6000393.29 N 6~233.~ E 0.000 2.520.66 6000~397.3~ N 684)231:22 E 0.0OD 252:5.39 6000469.92 N 680187~36 E 0.000 2610.17 6000542.50 N 680143.50 E 0.OIX) 2694.95 6000612.40 N 680101.27 E 0.000 2776.61 6000615.07 N 680099.65 E 0.O00 2779.73 6000687.65 N 680055.79 E 0.000 2864.5~ 6000760.23 N 680011.94 E 0.0O0 2949.30 6000~2.$1 N 679G68.08 E 0.000 3034.68 6000905.39 N 679924.22 E 0.000 3118.86 6000977.97 N 679880.37 E 0.000 3203.64 6001050.55 N 679536.51 E 0.000 328.5.43 6001123.13 N 679792.65 E 0.000 3373.21 6001195.70 N 679748.80 E 0.OO0 3457.99 600126~.28 N 679704.94 E 0.O00 3542.77 6001340.86 N 679661.08 E 0.000 3627.55 Commerd T-3 ('~1'6 ! SV1) Bollom Stuck Pipe Zone UG4A(~I~ Alaska State Plane Zone 4 Point Mclntym Pad 2 3 December, 1997- 13:35 - 3 - DrtflOuest Ld Sperry-Sun Drilling Services Proposal Report for P2-40 - P2-40 Wp2 FOR PERN~R'TING ONLY '7 I Shared Services Drilling Point Mclntrye Depth (~t) Incl, Azim, Vertical ~ Coordinates Depfll Nodhinge Eastings (ft) (a) (n) 7500.00 57.995 330.249 5644.95 5692.35 7600.00 57.995 330.249 5697,95 5745.35 7700.00 57.995 330.249 5750.95 5798.35 7800.00 57.995 330.249 5803.95 585 I 7900.00 57.995 330.249 5856.95 5904.35 8I 00.00 57.995 330.249 5962.95 6010:35 8200.00 57.995 330.249 6015,94 6063.34 8300.00 57.995 330.249 6068.94 6116.34 8400,00 57.995 330.249 6121.94 61 $9.34 8500.00 57.995 330.249 6174.94 6222.34 8600.00 57.995 330.249 6227.94 6275.34 8700.00 57.995 330.249 6280.94 6328.34 IN~)0,00 57,995 330.249 6333.94 6381.34 8900.00 57.995 330.249 6386.g4 6434.34 9000.00 57.995 330.?49 6439.94 6487.34 9100.00 57.995 330.249 6492.94 6540.34 9200.00 57.995 330,249 6545.94 6593.34 9300.00 57.995 330"?49 6598.94 6646.34 9400.00 57.995 330.249 6551.94 6699.34 9500.00 57.995 330.249 b-'704.94 6752.34 9600.00 57.995 330.249 6757.94 6805.34 9700.00 57.995 330.249 6810.94 6858,34 9500.00 57.995 330,249 6863.94 6911.34 9820, 68 57.995 330.249 6875.00 6922.40 9900.00 57.995 330.249 6916.93 69~4,33 9964.53 57,995 330.249 6§51.14 6998.54 10000.00 57.959 330.178 6969.94 7017.34 10~ 00.00 57.856 329.975 7023.07 7070.47 10200.00 57.754 32:9.772 7076.35 7123.75 3204.70 N 1874.28 W 3278,32 N 1916,36 W 3351.94 N 1958,44 W 3425.57 N 2000.52 W 3499.19 N 2G42.60 W 3572.61 N 2084.68 W 3946.43 N 2126.76 W 3720.06 N 2168.84 W 3793,68 N 2210.92 W 3867,5O N 2253.00 W 3940.g3 N 2295.08 W 4014,55 N 2337.16 W 4058.t7 N 2379.24 W 4161.60 N 2421.32 W 4235.42 N 2463.40 W 4309.04 N 2505.48 W 4382-66 N 2547,56 W 4456,29 N 2588.64 W 4529.91 N 2631.72 W 4603,53 N 2673.80 W 4677.16 N 2715.88 W 4750.76 N 2757.96 W 4824.40 N 2800.04 W 4898.03 N 2842.12 W 4913.40 N 2850,90 W 4971.65 N 2884.20 W 5019.16 N 2911.35 W 5045.26 N 2926.29 W 5 ! 18.68 N 2968.55 W 5191.67 N 3011.03 W Globa} Coordinates Dogleg Northings Eastings Rate (it) pt) ('nOOft) 6001413.44 N 679617.23 E 0.000 6001486.02 N 679573.37 E O.OOO 6001558.60 N 679529.52 E 0.0~ 6001631.I8 N 679485.66 E 0.000 6001703.76 N 679441.80 E 0.000 6001776.34 N 679397,95 E O.000 6001848.91 N 679354.09 E 0.O00 6001921.49 N 679310.23 E 0.000 6001994.07 N 679266.~ E 0.O00 6002066,65 N 679222.52 E 0.000 6002139.23 N 679178.66 E 0.000 6002211.61 N 679134.8! E 0.000 6002284.39 N 679090.95 E 0.000 6(X)2356.97 N 679047.10 E 0.000 6002429.54 N 679003.24 E 0.000 6002502.12 N 678959.38 E 6002574.70 N 678915.53 E 0,01XI 6002647.28 N 678871.67 E 0.000 6002719.86 N 671N127.81 E 0.000 6002792.44 N 678783.98 E 0,O00 6002865.02 N 678740.10 E 0.000 6002937.~ N 678696.24 E 0,000 6003010.17 N 678652.39 E O.000 60030~2.75 N 678608.53 E 0.000 6003097.9! N 678599.38 E 0.000 6003155.33 N 678564.6~ E 0.000 6003202.T 7 N 678536.37 E 0.000 6003227.90 N 678520.81 E 0.200 6003300.27 N 67847§.77 E 0.200 6003372.41 N 676432.53 E 0.200 Vedical (ft) 3712.34 3797.12 3881 3956,68 4051.46 4136.25 4221.03 4305.81 4390.59 4475.37 4560.16 4644.94 4729.72 4814.50 4899.29 4984.07 5153.63 5238.41 5407.9S 5492.76 5662.32 5680.02. 5747.11 5801.82 5831.88 5916.59 6¢3(}1.20 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment west Sak S'[ad Dir O 0.2000/1 t~'t' 9964.53~ MD, 6998.54ft TVD Continued... 3 December, f997 - 13:35 - 4 - DrfilQuest Sperry-Sun Drilling Services Proposal Report for P2.,40 - P2-40 Wp2 FOR PERMITTING ONLY z u') i Shared Services Dritling Point Mclntrye Depth Incl. Azlm. Vertical Local Coordinetes ~ Northings Easflngs (n) (f~) {~) 103(~.00 57.652 329.568 7129.78 7177.18 10337.76 57.614 329.49I 7150.00 7197.4~ 10400.00 57,551 329.364 7183.36 7230.76 10500.00 57.450 329.15g 7237.09 7284.49 10600.00 57.349 326.954 7290.97 7338.37 10700.00 57.248 328.749 7345.00 7S92.40 10800.00 57.148 328.543 7399.17 7446.57 10900.O0 57.048 328 ;336 7453.49 7500.89 11000.00 56.949 328.130 7507.96 7555.36 11100.00 56.850 327.~ 7562.57 7609.97 11200.00 56.751 327.714 7617.33 7664.73 11300.00 56.652 327.506 7672.23 7719.63 11400.00 56.554 327.297 7727.27 7774.b-'7 11500.00 56.457 a27',088 7782.45 7829.85 11542.00 56.416 327.000 7805.67 7853.07 11600.00 56.416 327.030 7837.76 78R5.16 11700.00 56.416 327.000 7893.07 7940.47 ! 1800.00 56.416 327.000 7948.39 7995.79 11900.00 56.416 327.000 8003.71 8051.11 12iX)0.00 56.416 $27.000 8059.02 8 t 06.42 12100.00 56.416 B27.000 8114.34 8161.74 12200.00 56.416 327.0(~ 8169.66 8217.06 12300.00 56.416 327 .O00 8224.97 8272.37 12400.00 56.416 327.000 8280.29 8327.69 12500.00 56.¢16 327.000 8335.5t 8353.01 12600.00 56.416 327.000 5390.92 8438.32 12700.00 56.416 327.000 E~,46.24 8493.64 12800.00 56.416 327.000 8501.55 8548.95 12900.00 56.416 327.000 8556.87 8604.27 13000.00 56.416 327.00~ 8612.19 8659.59 5264.83 N 3053.71 W 5292.33 N 3O69.89 W 5337.56 N 31)96.61 W 5410.05 N 3139.72 W 5482.30 N 3183.03 W 5554.32 N 3226.56 W 5626.10 N 3270.30 W 5697.64 N 3314.24 W 5768.95 N 3358.39 W 5840.01 N 3402.75 W 5910.83 N 3447.32 W 5981.41 N 3492.03 W 6051.74 N 3537.07 W 6121.84 N 3.582.26 W 6151.20 N 3601.29 W 6191.72 N 3627.61 W ~261.59 N 3672.98 W 6331 .,46 N 3718,36 W 6401.33 N 3763.73 W 6471.19 N 3809.10 W 6541.06 N 3854.47 W 5610.93 N 3899.85 W 6680.80 N 3945.22 W 6750.66 N 3990.59 W 6820.53 N 4035.96 W 6890.40 N 4081.33 W 6960.27 N 4126.71 W 7030.13 N 4172.08 W 7100.00 N 4217.45 W 7169.67 N 4262.62 W Global Coordinate~ Dogleg Northings Eastlngs Rate (fi) irt) Vertical 6003~.~?..31 N 678388.09 E 0.200 6065.73 6003471.4Q N 678371.?5 E 0~'00 6117.62 6003515.97 N 678343.44 E 0.200 6170.16 6003587.40 N 678296.58 E 0.200 6254.50 60D3658.56 N 678253.52 E 0.2GO 633~.74 G0037",~.52 N 678208.26 E 0.200 6422,8~ 6{X}380021 N 678162.79 E a.200 6506.94 6003870,6,6 N 678117.12 E 0.200 6590.g0 6003940.87 N 678071.25 E 0.200 6674.76 6004010.~ N 678025.17 E 0~-----------------~ 6758.51 6004080.55 N 677978.90 E 0200 6842.17 6004150.02 N 677932.43 E 0.200 6925.73 6004219.25 N 677885.75 E 0.200 7009.18 6004288.22 N 677838.98 E 0.200 7092.53 6004317.11 N 677819.13 E 0.203 717_7.50 6004356.99 N 677791.84 E 0.ODO 7175.79 6004425.73 N 677744.71~ E 0.O00 7259.04 6004494.47 N 677697.73 E 0.000 7342.30 6004563.22 N 677650.67 E 0.O00 7425.55 6004631.96 N 677603.61 E O. D00 7508.80 6004700.71 N 677556.56 E 0.000 75~2.06 6004769.45 N 677509.50 E 0.000 7675.31 6004838.20 N 677462.44 E O.000 7758.56 6004906.94 N 677415.39 E 0.000 7841.81 6004975.69 N 677368.33 E 0.iX)0 7925.07 6005044.43 N 677321.27 E 0.000 8008.32 6005113.17 N 677274.22 E 0.000 8091.57 600518t.92 N 677227.16 E 0.000 8174.83 6005250.66 N 577150.10 E 0.000 8258.0B 6005319.41 N 677133.05 E 0.0{30 8341.33 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Commenl Top CoMlle [Estimate] End Dir, Sa~l I~ 56.416': 11542.00ft MD, 7853.07fl TVD Continued... 3 December, 1997 - 13:35 - 5- D~itlQuest Sperry-Sun Drilling Services Proposal Report for P2-40 - P2-40 Wp2 FOR PERMITTING ONLY '7' Shared Services Drilling Point Mclntrye Measured Sub-Sea Verttca~ Local Coordinates Be~th Incl. Azim. ~ Depth Northings Eastings (ft) Or) (~t) (ft) (ft) Global Coordinates 1~91eg Vertical Northings Easflngs Rate Section (ft) (fl) (°rtOQft) (l~) 13100.00 56.416 327.0~0 8667.50 8714.90 7239.74 N 4308.20 W 13200.00 56.416 327.000 8722.82 8770.22 7309.60 N 4,%53.57 W 13300.~O 56.416 32:7.000 8778.14 8825.54 7379.47 N 4398.94 W 13346.76 56.416 327.000 1~04.00 8851.40 7412.14 N 4420.16 W 13364.84 56.416 327.000 B814.00 8861.40 7424.77 N 4428.36 W 13400.00 56.416 327.0~ 88~.45 8880.85 7449.34 N 4444.31 W 13437.15 56.416 327.1X~0 8854.00 8901.40 7475.29 N 4461.17 W 13500.00 56.416 327.000 8888.77 fl~6.17 7519.21 N 4489.69 W 13542.00 56.416 327.000 8912.00 8959.~ 7548.55 N 45G8,74 W 600538~.15 N 677085.99 E 0.000 8424.59 6005456.90 N 6770~8.~3 E 0.000 8507.84 60(~-~5.64 N 676991.8fl E 0.000 8591.09 6005557.78 N 676969.87 E O. IXI0 8630.Q2 6~X~:x570.21 N 676961.37 E 0.0~ 8645.07 6005594.38 N 876944.82 E 0.O00 8674.35 6005619.92 N 676927.34 E 0.000 8705.27 6005663.13 N 676897.76 E 0.000 8757.~0 6005692.00 N 676878.00 E 0.000 8792.56 13600.00 56.416 327.000 8944.O8 8991.48 7589.07 N 4535.06 W 13700.00 56.416 327.000 8999.40 9046.80 7658.94 N 4580.43 W 138~0.~ 56.416 327.0~) 9054.72 9102.12 7728.81 N 4625.80 W 13825.82 56.416 327.0(X) 9069.00 9116.40 7746.85 N 4637.52 W 13900.00 56.416 327.000 9110.03 9157.43 7798.67 N 4671.18 W 13965.82 56.416 327.000 9146.44 919'5.84 7844.66 N 4701.04 W 60~573'[.B7 N 67685~0.71 E 0.000 8840.85 600.5800.62 N 676863.6;5 E 0.(~0~ 8924.10 6~.~869.36 N 676756.59 E 0.000 9~07.36 6005887.11 N 676744.44 E 0.000 9(Y28.~ 6005938.11 N 676709.54 E O.000 909,0.61 60059~3.35 N 676678.56 E 0.000 9145.41 All data is ir~ feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 329.067° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13965.82ft., The Bottom Hole Displacement is 9145.41 ft., in the Direction of 329.067° (True). Co~lmellt Alaska State Plane Zone 4 Point Mclntyre Pad 2 ~ (K-10) Kalul~ [.mll: 13542.0~t MD, 8959.4Oft TVD, 676878.00 E, 6005692.00N clnlyre {P2-E}, 200.00 Radius: Geok~Ical WOC _T.o!,ql. Depth ' 13965.82ft MD, 9193.84.ff 'TVD /- Brier 3 December, 19~J7- ~3:35 - 6- OriiiQ~est H130389 DATE 1 i/i7/~ CHECK NO. 00130389 VENDOR A _ASKAST 14 O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET Ii1897 CKll1897A !00. O0 100. O0 PYMT COMMENTS' accompany 'peemit to deill' application HANDLINQ INST' s/h~ kathg campo~moe, z5122 THE A~ACHED CHECK IS IN PAYMENT FOR ~EMS DE~R;SED ABOVE. --Ill,ill ~ *¢. O0 O0 1 O0 O0 · WELL PERMIT CHECKLIST COMPANY FIELD & POOL ~ ~ ~ ~, ~ ~ INIT CLASS WELL NAME Ct~'~ r--[vl¥'~l/~,~'' ¢c~ -~ PROGRAM: exp [] dev ~redrll [] serv [] wellbore seg [: ann. disposal para req 0~ ~. GEOL AREA ~ L~ UNIT# I I(~ ~" 0 ON/OFF SHORE ~) ~ ADMIN I STRATI O N A~ DATE · 1. Permit fee attached ....................... ~ N 2. Lease number appropriate ................... (~ N 3. Unique well name and number .................. N 4. Well located in a defined pool .................. N 5. Well located proper distance from drilling unit boundary .... ~ N 6. Well located proper distance from other wells .......... ~ N 7. Sufficient acreage available in drilling unit ............ N 8. If deviated, is wellbore plat included .............. N 9. Operator only affected party ................... N 10. Operator has appropriate bond in force ............. N 11. Permit can be issued without conservation order ........ ~ N 12. Permit can be issued without administrative approval ...... ~ N 13. Can permit be approved before 15-day wait ........... N ENGINEERING APPR DATI~' 14. Conductor string provided ................... ~ N 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & sud csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ .~Y(_~ 18. CMT will cover all known productive horizons .......... (,,Y~N 19. Casing designs adequate for C, T, B & permafrost ....... ~~h ~_ 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. ~ .~- / 23. If diverter required, does it meet regulations .......... ~..y~N 24. Drilling fluid program schematic & equip list adequate ..... 25. DOPEs, do they meet regulation .......... ~ ..... Y(,,~N 26. DOPE press rating appropriate; test to _.%~ o psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... (j~ N 29. Is presence of H2S gas probable ................. ~ N GEOLOGY AP~ DATE 30. Permit can be issued w/o hydrogen sulfide mea~ . . Y N 31. Data presented on potential overpress~ ....... Y N 32. Seismic analysis of shallow ~ ............ Y N 33. Seabed conditionsu~~off-shore) ............. Y N 34. Contact n one for we.eklyprogress repo. rts ....... Y N {exploratory omyj RE,lARKS GEOLOGY: RPC ~ ENGINEERING: COMMISSION: DEW DWJ_.~..~ JDH ,,.)_,~.~1,-~ RNC ~/'//~ /.,,02 CO CO Comments/Instructions: HOWIIjt - A \FORMS\chekhst rev 09/97 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Tue Jan 06 16:00:45 1998 Reel Header Service name ............. LISTPE Date ..................... 98/01/06 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/01/06 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS.Writing Technical Services Library. Scientific Library. Scientific Physical EOF Comment Record TAPE HEADER POINT MCINTYRE MWD/M3~D LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LocATIoN SECTION: TOWNSHIP: MWD RUN 2 AK-MM-80039 T. MCGUIRE KIRK WHITE RANGE: FNL: FSL: FEL: FWL: .ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: P2-40 500292283700 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 06-JAN-98 MWD RUN 3 AK-MM-80039 S. GONIOTAKI KIRK WHITE 14 12N 14E 328 3955 47.10 45.60 12.10 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: File Header OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 5976.0 8.500 13985.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE SUB-SEA TRUE VERTICAL DEPTHS (SSTVD) . 3. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. 4. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 5. MWD RUN 3 IS DIRECTIONAL WITH DGR, EWR4, COMPENSATRED NEUTRON POROSITY (CNP AND STABILIZED LITHO-DENSITY(SLD). 6. SLIDE INTERVALS REFER TO SLD SENSOR DEPTH RATHER THAN BIT DEPTH. 7. DEPTH SHIFT/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN T WALKER OF ARCO ALASKA, INC. AND M MUNYAK OF SPERRY-SUN DRILLING SERVICES ON 01/07/98. 8. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13985'MD, 9179'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY(SANDSTONE MATRIX FIXED HOLE SIZE) SBDC = SMOOTHED BULK DENSITY (COMPENSATED). SCOR = SMOOTHED STANDOFF CORRECTION. SNPE = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR. SNNA = SMOOTHED NEAR DETECTOR COUNT RATE. SNFA = SMOOTHED FAR DETECTOR COUINT RATE. ENVIRONMENTAL PARAMETERS USED IN NUCLEAR LOG PROCESSING: HOLE SIZE: 8.5" MUD FILTRATE SALINITY: 950 PPM CHLORIDES TO 19500 PPM CHLORIDES MUD WEIGHT: 9.3 PPG TO 10.4 PPG FORMATION WATER SALINITY: 14545 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/06 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH FET 5946.0 13923.5 RPD 5946.0 13923.5 RPM 5946.0 13923.5 RPS 5946.0 13923.5 RPX 5946.0 13923.5 GR 5954.0 13944.0 ROP 5990.0 13985.0 FCNT 12727.0 13897.5 NCNT 12727.0 13897.5 NPHI 12727.0 13897.5 PEF 12761.0 13931.5 DRHO 12761.0 13931.5 RHOB 12761.0 13931.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel MERGED MAIN PASS. $ BIT RUN NO MERGE TOP MERGE BASE 2 5990.0 12812.0 3 12812.0 13985.0 DEPT FT 4 1 68 GR MWD AAPI 4 1 68 RPD MWD OHMM 4 1 68 ROP MWD FT/H 4 1 68 RPX MWD OHMM 4 1 68 RP S MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 FET MWD HRS 4 1 68 NPHI MWD P.U. 4 1 68 RHOB MWD G/CC 4 1 68 DRHO MWD G/CC 4 1 68 PEF MWD BARN 4 1 68 NCNT MWD CNTS 4 1 68 FCNT MWD CNTS 4 1 68 0 4 8 12 16 20 24 28 32 36 40 44 48 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Name Min Max Mean Nsam DEPT 5946 13985 9965.5 16079 GR 4.2269 365.111 75.4588 15981 RPD 0.2539 2000 8.83659 15956 ROP 6.026 2155.16 273.377 15991 RPX 0.4267 2000 3.42365 15956 RPS 0.1284 29.3418 3.34209 15956 RPM 0.1252 2000 3.61231 15956 FET 0.1432 20.8611 0.665369 15956 NPHI 16.1909 50.3516 31.4375 2342 RHOB 2.0913 3.0474 2.5219 2342 DRHO -0.082 0.5453 0.0531729 2342 PEF 2.4409 10.4724 5.00895 2342 NCNT 2264 3732.47 2908.94 2342 FCNT 483 1111.6 690.284 2342 First Reading 5946 5954 5946 5990 5946 5946 5946 5946 12727 12761 12761 12761 12727 12727 Last Reading 13985 13944 13923.5 13985 13923.5 13923.5 13923.5 13923.5 13897.5 13931.5 13931.5 13931.5 13897.5 13897.5 First Reading For Entire File .......... 5946 Last Reading For Entire File ........... 13985 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/06 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/06 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 5946.0 12769.5 RPD 5946.0 12769.5 RPM 5946.0 12769.5 RPS 5946.0 12769.5 RPX 5946.0 12769.5 GR 5954.0 12777.0 ROP 5990.0 12813.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY' (OPLM~) AT. TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: 18-DEC-97 ISC 5.06 CIM 5.4'6 MEMORY 12812.0 5990.0 12812.0 56.3 60.5 TOOL NUMBER P0897CRG6 P0897CRG6 8.250 8.3 SPUD MUD 9.70 45.0 9.0 900 4.6 .720 .347 .950 1.300 61.1 HOLE CORRECTION (IN) : TOOL STAJqDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value .................... ~.-999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 GR MWD 2 AAPI 4 1 68 RPX MWD 2 OHMM 4 1 68 RPS MWD 2 OHM}4 4 1 68 RPM MWD 2 OHMM 4 1 68 RPD MWD 2 OHMS4 4 1 68 ROP MWD 2 FT/H 4 1 68 FET MWD 2 HOUR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max DEPT 5946 12813.5 GR 4.2269 125.766 RPX 0.4267 2000 RPS 0.1284 23.14 RPM 0.1252 2000 R?D 0.2539 2000 ROP 6.026 2155.16 FET 0.1432 2.1259 Mean Nsam 9379.75 13736 72.7598 13647 3.25903 13648 3.08898 13648 3.37488 13648 9.43153 13648 285.835 13648 0.501323 13648 First Reading For Entire File .......... 5946 Last Reading For Entire File ........... 12813.5 First Reading 5946 5954 5946 5946 5946 5946 5990 5946 Last Reading 12813.5 12777 12769.5 12769.5 12769.5 12769.5 12813.5 12769.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ' 1.0.0 Date of Generation ....... 98/01/06 Maximum Physical Record..65535 File Type ................ LO' Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/06 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FCNT 12727.0 13897.5 NCNT 12727.0 13897.5 NPHI 12727.0 13897.5 PEF 12761.0 13931.5 DRHO 12761.0 13931.5 RHOB 12761.0 13931.5 FET 12770.0 13923.5 RPD 12770.0 13923.5 RPM 12770.0 13923.5 RPS 12770.0 13923.5 RPX 12770.0 13923.5 GR 12777.5 13944.0 ROP 12814.0 13985.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINI .MUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 20-DEC-97 ISC 5.06 CIM 5.46 MEMORY 13985.0 12812.0 13985.0 50.9 56.7 TOOL NUMBER P0889CRLGM6 P0889CRLGM6 P0889CRLGM6 P0889CRLGM6 8.250 8.3 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 KCL/GEM 10.40 38.0 9.0 19500 3.4 .240 .100 .220 .320 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 AAPI 4 1 68 4 2 RPX MWD 3 OHMM 4 1 68 8 3 RPS MWD 3 OHMM 4 1 68 12 4 RPM MWD 3 OHMM 4 1' 68 16 5 RPD MWD 3 OHMM 4 1 68 20 6 ROP MWD 3 FT/H 4 1 68 24 7 FET MWD 3 HOUR 4 1 68 28 8 RHOB MWD 3 o G/CC 4 1 68 32 9 DRHO MWD 3 G/CC 4 1 68 36 10 PEF MWD 3 BARN 4 1 68 40 11 NPHI MWD 3 P.U. 4 1 68 44 12 NCNT MWD 3 CNTS 4 1 68 48 13 FCNT MWD 3 CNTS 4 1 68 52 14 74.4 First Name Min Max Mean Nsam Reading DEPT 12727 13985 13356 2517 12727 GR 31.7679 365.111 91.2402 2334 12777.5 RPX 0.8261 27.0335 4.39712 2308 12770 Last Reading 13985 13944 13923.5 RPS 0.7432 29.3418 4.83879 2308 RPM 0.6244 61.4848 5.01631 2308 RPD 0.486 201.707 5.31851 2308 ROP 6.6772 466.699 200.804 2343 FET 0.3251 20.8611 1.63543 2308 RHOB 2.0913 3.0474 2.5219 2342 DRHO -0.082 0.5453 0.0531729 2342 PEF 2.4409 10.4724 5.00895 2342 NPHI 16.1909 50.3516 31.4375 2342 NCNT 2264 3732.47 2908.94 2342 FCNT 483 1111.6 690.284 2342 12770 12770 12770 12814 12770 12761 12761 12761 12727 12727 12727 13923.5 13923.5 13923.5 13985 13923.5 13931.5 13931.5 13931.5 13897.5 13897.5 13897.5 First Reading For Entire File .......... 12727 Last Reading For Entire File ' 13985 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/01/06 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/01/06 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 98/01/06 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File