Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
205-147
STATE OF ALASKA , 0ALASKA OIL AND GAS CONSERVATION COMAIN REPORT OF SUNDRY WELL OPERAS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 205-147 3. Address: P.O.Box 196612 Anchorage, Development E1 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20577-02-00 7. Property Designation(Lease Number): ADL 028304 8. Well Name and Number: PBU E-21 B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY.PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12160 feet Plugs measured 10060,10370,10691 feet true vertical 9016 feet Junk measured 12085 feet Effective Depth: measured 10060 feet Packer measured 8741 feet true vertical 8569 feet Packer true vertical 8297 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20"x 30" 36-116 36-116 Surface 2661 13-3/8" 36-2697 36-2697 5380 2670 Intermediate 9848 9-5/8" 34-9883 34-8419 6870 4760 Liner 7520 7" 2425-9945 2425-8472 7240 5410 Liner 606 4-1/2" 9794-10400 8343-8799 8430 7500 Liner 1881 3-1/2"x 3-3/16"x 2-7/8" 10273-12154 8725-9015 Perforation Depth: Measured depth: 9945-12060 feet True vertical depth: 8472-9007 feet sCANNED JUN 1it�i 1 1 2018 Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 6J 3 V2-J99798 32-8345 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Packer 8741 8297 true vertical depth) No SSSV Installed RECEIVED 12.Stimulation or cement squeeze summary: o l Y Intervals treated(measured): MAY 2 3 2018 Treatment descriptions including volumes used and final pressure: AOGCC 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 165 43287 12 0 964 Subsequent to operation: No Test Available 120 150 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations m Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Il Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: WA Authorized Name: Brown,Don L. Contact Name: Brown,Don L. Authorized Title: Petroleum Engineer Contact Email: browd2@BP.com }r�-q Authorized Signature: �E�._ -(-. 1 Date: 7:23/4(; Contact Phone: +1 9075644675 Form 10-404 Revised 04/2017 V / L 6' & 19 RBDMS1 MAYY269 2018 Submit Original Only > //i • Daily Report of Well Operations PBU E-21B ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL***(SLB ELINE PERF) INITIAL T/I/O=450/390/0. RIH W/2.5"X 31' PJO GUN,6 SPF, 60 DEG PHASE. OAL=44', OAW=350 LBS, MAX OD= 2.78". PERFORATE FROM 9945'-9976'. GOOD INDICATION OF SHOT. ALL LOGS CORRELATED TO BP PDCL LOG DATED 31-OCT-2016 WELL SHUT IN ON DEPARTURE. FINAL T/I/O=0/305/0 PSI 5/13/2018 ***JOB COMPLETE 13-MAY-20*** Fluids Summary Bbls Type 1 Diesel TREE= 4-1/2"5M CNV 1A43LHEAD= FMCNOTES: WELL ANGLE>—70°la 10700'. ACTUATOR= BAKER • � NIPPLE IS NOT ACCESSIBLE DUE TO 001433.B.. . 2l= 59.18' - 1 B 2.355"SEAL ASSY ID REF B.EV= 66.12' BF.E LEV= 30.76' KOP= 3006' 2219' 4-1/2"IES HXO SSSV LANDING MP, Max Angle= 96'f 11448' . 13=3.813' Datum MD= 10499 Datum TVD= 8800'SS TOP OF 7"TemCK LNR H 2419' 13-318"CSG,72#,L-80,D=12.347" H 2691' . GAS LIFT MANDRELS Minimum ID =2.355" 10273' ST MD TVD DB/ TY FE VLV LATCH PORT DATE 2 4435 4261 39 CAM DM1' M 0 12/09/03 1 7837 6868 46 CAM OW INT 0 12/09/03 NOTE LATCI CN GLV#182AtiESfiiIPPB) 3-112" LTP w/SE AL ASSY 9731' H4-112"HE'.5XImo'',D=3.813' TOP OF 7"LNR H 9370' ' I 9741' H7"X 4-1/2'BKR S-3 PKR,D=3.875' I 9764' H4-112"I X NP,D=3.813" 9785' 41/2"HES XN NP,MLLES) (1029/05)D=3.80' 4-1/2"TBG,12.6#,L-80..0152 bpi.ID=3.958" 9798' I P 8788' —141/2 WLEG.D=3.958' ii I:4 9789' H E LND TT LOGGED 01/13/98 9-5/8'CSG,476,L-80,D=8.681' —f 9877' P ` 8784' Hr X 4-1/2'BKR ZXP PKR,D=4.438' 10060' --I 4-1/2"WFD E X1B'DE)RANGE CLIP(11/5117) I 7"LNR,26#,L-80,.0383 bpf,D=6.278' H 10675" i1.1 1( i/1 i 1 10273° H3-1/2"LNR TOP PKR w/SEAL ASSY.ID=2.355' .* .•1111111=4 :IP .�.11111111111� it 10279' 3.70"BKR D[ LOY SLV,D=3.00' 41111/1/1/11' MLLOUTW1COW(E-21A) 9945'-9951' ♦ 4.0, ► 10300' HTOP OF CEMENT �11�11•�1 I. 10321' 3-1/2"Hes X 1+9?D=2.813" 13-1/2"LMR,8.816,L-80 STL,.0080 bpf,D=2.992" 10363' 1 1 10358` H3-1/2"x3-s/16"XO,D=2,867' . /A , _ EX ', 10370' HWFD2.187" T1343ED RANGE COP(09/27/17) , 4 10400' RA TAG - 10409' >� MLLOUT WINDOW(E.21 B) 10400'-10407' 41/2"BKR CEP(10/28/05) 10450'ELM _!_ 4-1/2"LIR.12.66,L-80,.0152 bpf,D=3.953" —I 13487 ; ` 10606' H3-3/16"X 2-7/8"XO,ID=2.441" PERFORATIONSLAMMRY 1 1 4, 10691' H2-7/8'WFDGBP(11/23/16) I REF LOG: SWS MBui CNL ON 11/07/05 1 ANGLE AT TOP I : cs 9945' 1.......... 12085'CTMD 1FSIt MLLED Note:Refer to Ffoduciion DB for historical perf data CBP(07A')4112} SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-1/2" 6 9945-9976 0 05/13/18 3-311r LIR,6.2#,L-80 TCII, 10606' 2-1/2' 6 10097-10102 C 07/07/17 .0076 bpf,ID=2.80" r 6 10660-10670 C 11/23/16 r 6 10710-11080 S 11/08/05 07/02/12 2" 6 11130-11230 S 11/08/05 07/02/12 2' 6 11360-11430 S 11/08/05 07/02/12 2" 6 11500-11790 S 11/08/05 07/02/12 PBTD 12118' Noy+ 2' 6 11820-11900 S 11/08/05 07/02/12 2-7/8"LMR,6.16#.L-80 STL,.0058 bpf,D=2.441" H 12164' ' 2" 6 11930-12060 C 11/08/06 DATE REV BY COIVMB`QS DATE REV BY COIVIMB4TS PRUDHOE BAY UM' ? ORIGINAL COMPLETION 09/28/17 ZV/JMD SET EXT RANGE COP(09/27/17) WELL: E-21B 12122/97 JIM SIDETRACK COMPLETION 11/08/17 GJB/JMD SET EXT RANGE CBP(11/05/17) POW No:R'2051470 11/09/05 Nordic! CTD SIDETRACK 05/15/18 MS/JM) ADPB2FS(05/13/18) API No: 50-029-20577-02 11/30/16 JJI JJMD ADPE3RFS&SET CBP(1123/16) SEC 6,T11 N,R14E,1633'FM_&883'WB 07/10/17 BTWJMD AEFS(07/07/17) 08/15/17 JNLJJMD ADO REF&BF ELEV BP Exploration(Alaska) • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Tuesday, November 7, 2017 5:28 PM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC1 Facility OIL;AK, OPS GC1 Field O&M TL;AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead; AK, OPS Prod Controllers;AK, OPS Well Pad EKG;Ak, Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Derrick, Laurie R Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey;Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua; Worthington,Aras J;Wallace, Chris D (DOA) Subject: • OPERABLE: Producer E-21 B (PTD#2051470) Passing MIT-T and CMIT-T x IA confirms well barriers All, Producer E-21B(PTD#2051470)was put under evaluation on 10/28/17 for having sustained inner annulus casing pressure. On 11/05/17 slickline set a cast iron bridge plug @ 10060' MD.On 11/06/17 fullbore obtained a passing MIT-T to 2573 psi and a passing CMIT-T x IA to 2658 psi.The passing pressure tests confirm two competent well barriers.The well will now be classified as OPERABLE. Please respond with any questions. Andrew Ogg Well Integrity Engineer SCANNED Eli 8 iL L116 BP Global Wells Organization-Alaska Office:907-659-8110 Cell:307-399-3816 Fro . ° GWO Well Integrity Engineer Sent: Saturda , ' ober 28, 2017 7:13 AM To: 'Regg,James B (6• , 'im.regg@alaska.gov)'; AK, OPS EOC Specialists; AK, OPS GC1 Facility OTL; AK, OPS GC1 Field O&M TL; AK, OPS GC1 I • AK, OPS GC1 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad EKG; Ak, Ops West Are. ; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; Derrick, Laurie R Cc: AK, GWO Completions Well Integrity; AK, G 6HD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Informatio 'K, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; ; ,owski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Tern e- , oshua; Worthington, Aras J; 'chris.wallace@alaska.gov' Subject: UNDER EVALUATION: Producer E-21B (PTD# 2051470) Sustained in : annulus casing pressure above NOL All, Producer E-21B(PTD#2051470)was reported to have sustained inner annulus casing pressure above on 10/26/17. The pressures were reported to be T/I/0= 1000/2250/Opsi. At this time the well is reclassified as • •er Evaluation and is on the 28 day clock for diagnostics and repairs. 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Saturday, October 28, 2017 7:13 AM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC1 Facility OTL;AK, OPS GC1 Field O&M IL;AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead; AK, OPS Prod Controllers;AK, OPS Well Pad EKG;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Derrick, Laurie R Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua; Worthington,Aras J;Wallace, Chris D (DOA) Subject: UNDER EVALUATION: Producer E-21 B (PTD#2051470) Sustained inner annulus casing pressure above NOL Attachments: E-21 B.pdf All, Producer E-21B(PTD#2051470)was reported to have sustained inner annulus casing pressure above NOL on 10/26/17. The pressures were reported to be T/I/0= 1000/2250/Opsi. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. Production Engineer—Evaluate for secure Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 SCANNED :ER WO s�.ar...rr.«..... a. 1 NECSTATE OF ALASKA E'VED .LASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIO (�r T 5 `� 1. Operations Performed OHO I 2 " `017 Abandon 0 Plug Perforations Ef Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 ChangGC ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other Set CIBP Ed 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 205-147 3. Address: P.O.Box 196612 Anchorage, Development I I Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20577-02-00 7. Property Designation(Lease Number): ADL 0028304 8. Well Name and Number: PBU E-21 B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12160 feet Plugs measured 10370/10690 feet true vertical 9016 feet Junk measured 12085 feet Effective Depth: measured 10370 feet Packer measured 9744 feet true vertical 8782 feet Packer true vertical 8299.39 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 38-118 38-118 Surface 2660 13-3/8"72#L-80 36-2696 36-2696 4930 2670 Intermediate 9847 9-5/8"47#L-80 34-9881 34-8417 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10097-10102 feet 10660-10670 feet 10710-11080 feet 11130-11230 feet 11360-11430 feet 11500-11790 feet 11820-11900 feet 11930-12060 feet True vertical depth: 8599-8603 feet feet 8974-8980 feet 8996-9009 feet 9010-9015 feet 9020-9017 feet 9010-9004 feet 9004-9006 feet 9007-9007 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 32-9800 32-8347 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): CQl Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 163 40801 13 760 931 Subsequent to operation: Shut-In 1620 2400 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations Of Exploratory ❑ Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Derrick,Laurie R Contact Name: Derrick,Laurie R Authorized Title: �pJett oleuumm Engineer Contact Email: Laurie.Derrick(dbp.com Authorized Signature: )J r ))y\,A &j & Date: )�j' J/� Contact Phone: +1 907 564 5952 Foran 10-404 Revised 04/2017 /2 /7-//7 7-// /�('/'�� RBD S (---'NOVSubmit Original Only / 7 /i �/ ���� - 2 2017 • • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary October 24, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Cast Iron Bridge Plug (CIBP) for Well E-21 B, PTD # 205-147. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 S • CD a, 00000 (S) o (v tico 0 00O cO •-• u) 10 p N ct 1.1) LI) N- r,_ U NO L O O �O O� O L0 CO O CO N Nco m V (O r r CO00 N (fl V NNNN Cf) N- O) 0) N- O) N- CO C)) r N- O) co Co N CO N- 00 C7) a0 00 O) a0 F O) C") 0) N N CO CO V N CO V N N- t N CO ch CO 0) co N- ti O) Cr) N N- CO CO CO CO C • o _ _ N-- CO CO 'Cr 00 CO r v-CO ° (fl .�- O N 0) 0) p M O N p N (T m O ✓ p I I I I I I MM Qo Cr) CN co CO 'Sr N N- 6�) N C7 COO(.O N CD I CO M MN CO 0 CO 0 0 0 CO = W Q. p O O O O O CO O CO CO CO CO CO J C QC) J J J J J J CO CO • C) Op N * J J CaO r N co (0 N N X ti Cb Cfl r N O N N N _ -06 Cfl U N C j N N 0\0 N C7 i r r i":0- I C") N 4 C'7 t r-+ O CO t Cn r O) 't Cr' t co C co co co C7) r CO N CC) Cf) r-- cu d N O CO N r (� J W CC Q C)0 0 U W W U C CC CC C w C : Z Z a W W W W W W W Q j H Z Z Z Z Z Z D U Cn z J J J J J J H • S a) U d • co O V� Q) L " I N CL m x O (n N H- L � a) CTs Ca _ CO CO J N N N • r r r Q� 4 V E V CO Nr 4.1 CO CD CO < CO N M N- N co 00 co \ N ccn Q- C C M Y N ✓ C) CA O 3- c LU LU QYY LL C_) ~ 0 d � m Emmm Z N N N L11ww U) • • E ^ o N 1--. u) o ° 0 o L Mcn M o L O a) c_ ca QE -0• — w Y J m o L - Q LC) a) 3N ° Ii N 0 N -.t., X C -0 E0 g 0 o > E W W Q� Q E o o : Q o 0. _ m m m - W I) ~ O D 'ct _ N- J LL -0 m � ' � - ab . N N ,_ 1< omz LI W a'in xf- MUa F- w0 z0 • Ca ° _ < at• a � 0 _ CC Q Q a) TN cm En N O W O -x m U N O W E re :J -0 .v co 0 Z I— >1 > 2 W Q a -62 � � CO F- W < ErF- b J 0 `- in M Z O N co co Z � to (O M � 0000 (O , � 0 ' M (1) 000 `- 00W ~ ~ ~ I ~ LL J J _ W H H LL W > w ll Li_ O N : 000 <- 0U) : 0 W H < 1-- O O F- N 13 — 5 N Er) _ 0) 0 Q TREE= 4-1/2"5M CAN • Wfl LFEAD= FMC ----.--.1 NOTES: WELL ANGLE>-70"@ 10700'. ACTUATOR= BAKE E -Z 1B 3-1/2" NOT ACCESSIBLE DUE TO OKB.ELE.V= 59.18 3 "SEAL ASSY ED REF BLE/= 65.12' BF.B_EV_ 30.76' KOP= 364)6' 2219' —4-12"FES HXO SSSV LANDING NP, Mu Angle= 96'C 1144If !" D=3.813" -Datum MD= 10499 tw.+ Dn N akaD=_ 8800 SS a TOP OF r TIEBACK LNR H 2419' ✓� 13-3/8"CSG,72#,L-80,D=12.347" -{ 2691' GAS LET MANDRELS ST MD ND DEV TYPE VLV LATCH P(1RT DATE 2 4435 4261 39 CAM DMI NIT 0 12/09/03 Minimum ID =2.355" 10273' 1 7837 6868 46 CAM DAY NIT 0 12/09/03 NOTE LATCHON GLV#1&2 ARE STRIPPED 3-1/2" LTP w/SEAL ASSY 9731' 14-1/2"FES X NP,D=3.813' TOP OF 7"LNR —1 9370' I 9741' H r X 4-12"BKR S-3 RSR D=3.875' 9764' —14-1/2"FES X NP,OD=3.813" 9785' —4-12"FES XN MP,PALLED (10/29/05)D=3.80' 4-12"TBG, 12.6#,L-80,.0152 bpf,D=3.958" H 9798' ,' 9798' --I4-1/2 4VLEG,D=3.958" :f 9789' H EluO TT LOGGED 01/13/98 III ' 9794' H r X 4-1/2"BKR ZXP RSR,D=4A38' 9-5/8'CSG,47#,L-80,D=8.681" H 9877' A 1 4 i T LNR,26#,L-80,.0383 bpf,D=6.276" — 10675 ♦• ♦N� 10273' -13-112"LNR TOP PKR w/SEAL ASSY,D=2.355" .4444►. P.i ,4NN� .44444444444444 ' ' 10279' --j 3.70'BKR DEPLOY SLV,D=3.00" 444141 ' MLLOUT WIDOW(E-21A) 9945'-9951' 444444111111 ►R 10300' -HOP OF CEMENT ,tri«4'#'«tl, c 10321' --13-1/2'FES X NP,D=2.813' 1 1 10353' H3-1/7 x 3-3/16"x0,D=2.867" 3-12"LFP,8.81#,L-80 STL,.0080 bpf,D=2.992" — 10363' N Aft to '4i 10370' —I WFD 2.187'EXTENDED RANGE CEP(0927/17) W1-I6- TOCK H 10400' `\ RA TAG — 10409' `N. FALLOUT WNDOW(E-21B) 10400'-1040T 4-112'BKR CEP(10/28/05) 10450' ELM —c=-- 4-1/2'LNR, 12.6#,L-80,_0152 bpf,D=3.953" H 13487' - 10606' 33/16"X 2-7/8'XO,D=2.441 R3�FORATK}M SUMMARY 1 ,/ 10691' H2-7/8'V.FDCEP(1123/16) REF LOG: SWS MEM CAL ON 11/07/05 74.4.4.1.4.0 ANGLE AT TOP FERE:36°©10097' 1.1.1.4.4.4 Note:Refer to Production DB for historical perf data 12085'CTMD —FISR MLLE) SIZE SPF NITER/AL Opn/Sqz SHOT SQZ cep(07/04/12) 2.5" 6 10097-10102 0 07/07/17 ' 3-3/16'LW,6.2#,L-80 TCA, 10606' 2' 6 10660-10670 C 11/23/16 .0076 bpf,D=2.80" 2" 6 10710-11080 S 11/08/05 07/02/12 2' 6 11130-11230 S 11/08/05 07/02/12 ` 2" 6 11360-11430 S 11/08/05 07/02112 2" 6 11500-11790 S 11/08/05 07/02/12 2" 6 11820-11900 S 11/08/05 07/02/12 PBM -- 12118'114c,, 2' 6 11930-12060 C 11/08/05 2-7/8"LP,6.16#,L-80 STL,.0058 bpf,D=2.441' -{ 12164' DATE REV BY COMENTS DATE REV BY CONVENTS PRUDHOE BAY I,HT ? ORIGINAL COMPLETION 09/28/17 ZV/JM) SET EXT RANGE CEP(09/27/17) WELL: E 21B 12/22197 JLM SIDETRACK COMPLETION PERMIT Pb: 2051470 11/09/05 Nordlc1 CTD SIDETRACK API No: 50-029-20577-02 11/30/16 JJUJM) ADPERFS&SET CUP(1123/16) SEC 6,T11 N,R14E,1633'Ft4&883'WEL 07/10/17 BTAYJM)ADPERFS(07/07/17) 08/15/17 JNUJAI)ADD REF&BF ELEV BP Exploration(Alaska) STATE OF ALASKA •LASKA OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing D Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 205-147 3. Address: P.O.Box 196612 Anchorage, Development ® Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20577-02-00 7. Property Designation(Lease Number): ADL 028304 8. Well Name and Number: PBU E-21B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12160 feet Plugs measured 10691 feet RECEIVED true vertical 9016 feet Junk measured 12085 feet 4 Effective Depth: measured 10691 feet Packer measured 9744 feet AUG UG G 7 true vertical 8989 feet Packer true vertical 8300 feet AOGCC Casing: Length: Size: MD: ND: Burst: Collapse: Conductor 80 20"x 30" 38-118 38-118 Surface 2660 13-3/8" 36-2696 36-2696 4930 2670 Intermediate 9847 9-5/8" 34-9881 34-8417 6870 4760 Liner 7520 7" 2425-9945 2425-8472 7240 5410 Liner 606 4-1/2" 9794-10400 8342-8799 8430 7500 Liner 1881 3-1/2'x3-3/16"x2-7/8" 10273-12154 8725-9015 Perforation Depth: Measured depth: 10097-12060 feet True vertical depth: 8599-9007 feet feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 32-9800 32-8347 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Packer 9744 8300 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: sp+p tii1EQ Nov 0 12017, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 7 3616 2 200 160 Subsequent to operation: 0 0 0 80 1660 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development IZE Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Ir Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Derrick,Laurie RContact Name: Derrick,Laurie R Authorized Title: Pet leum Engineer Contact Email: Laurie.Derrick@bp.com Authorized Signature: ".---- �},,,,yet Date: g/R-1/2_0/._ Contact Phone: +1 907 564 5952 Form 10-404 Revised 04/2017 /"Tz /19/6 ` `Y— Submit Original Only /t/ �, RBDMS �v ,*1 6 2017 s y • • Daily Report of Well Operations E-21B ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL***(perforating). DRIFTED TO TOP OF LTP @ 10243' SLM (10,273' MD)W/2.50"x 10' DUMMY GUNS (no issues) 7/1/2017 ***WELL S/I ON DEPARTURE, PAD OP NOTIFIED*** ***JOB STARTED ON 7-JULY 2017***(SLB E-LINE PERFORATING) WELL SHUT IN ON ARRIVAL. RU. PT. RUN 1: RIH W/2.5"x 5' POWERJET HSD, 6 SPF, 60 DEG PHASING. PERFORATE 10097'- 10102', CCL TO TOP SHOT 3.3', CCL STOP DEPTH = 10093.7'. POOH. LOG CORRELATED TO BPXA PDCL LOG DATED 31-OCT-2016. RDMO. NOTIFY PAD OP ON DEPARTURE. HAND OVER RAP. WELL SHUT IN ON DEPARTURE. 7/7/2017 ***JOB COMPLETE ON 7-JULY-2017*** 1. T D- 41/2"SMS • S/ NOTES: WELL ANGLE>_70"@ 10700'. VELLFEAACTUATOR= BAKER E-2 1 B 3-1 S"SEAL LE IS IDT ACCESSIBLE DUE TO OKB.BEV= 59.18' BF BEV= 32.08' KOP= 3006' Max Angle= 96 fp 11448' 2219' j41/2"Ht's WO SSSV LAMING NP, Datum MD= ..... 10499 0 j [ ID=3.813' Datum TVD= 8800'SS TOP OF 7"TACK LNR H 2419' 13-3/8'CSG,72S,L-80,D=11347" H 2691' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE 2 4435 4261 39 CAM OW M 0 12/09/03 Minimum ID=2.366" 10273' 1 7837 6868 46 CAM DMY M 0 12/09/03 ��" NOTE LATCIES ON GLV#1&2 ARE STRIPPED 3-112" LTP w/SEAL ASSY 9731' _-141/2"HES X NP,D=3.813" TOP OF T LNR H 9370' ' 9741' HT X 4-1/2'13101S-3 PKR,D=3.875" 9764' 4-1/2'HES X NP,0=3.813' 9785' I—4-1/2'FES XN NP,MLLE) (10/29/05)D=3.80- 4-1/2"TBG,12.6#,1-80,.0152 bpf,D=3.958' H 9798' k 9798' H412 WEED,ID=3.958' 9789' H BMT)TT LOGO 01/13/98 9794 H 'X 4-1/2'BKR ZXP FKR,13=4.438' 9-5/8'CSG,47#,L-80,D=8.681" —I 9877' 1 1 T LNR,26#,L-80,.0383 bpf,13=6 276' H 10675' ,,/,,,A1 4 10273' 3-12'LNR TOP PKR w/SEAL ASSY,D=2.355' .♦'1.1'1'1'1' 4111111 10279' 3.70'BKR DEPLOY SLY,D=3.00" MLLOUT W�+DOW(E-21A) 9945'-9951' 4V+.......441111 10300' HTOp OF Ce�YT1 ► 7,6• 10321' H3-112'FES X NP,D=2.813" 1 I 3-1/2'LNR,8.81#,L-80 STL,.0080 bpf,D=2.992" H 10363• 1 • 10353' H3-1/2"X 3-3/16"XO,D=2.867" i1 • W- E'STOCK —{ 10400' � FALLOUT WINDOW(E-218) 10400'-10407' RA TAG 10409' '•. 4-12'BKR CEP(1028/05) H10450'ELM ' 10606' H3-3/16'X 2-7/8"XO,13=1441" , 4-12'UR,12.69,L-80,.0152 bpf,D=3.953' 1348r H , ` 10691' 2-7/8-1NFDCBP(11/23/16) PERFORATION SUMMARY �Ss\ REF LOG: SWS MEM CM_ON 11/07/05 1 ANGLE AT TOP PERF:36° 10097' 4�4�4�4�j�j Note:defer to Production DB for historical perf data D I—FISH MLLE) SIZE SPF INTERVAL Opn/Sgz SHOT SQZ CLIP(07/04/12) 2.5" 6 10097-10102 0 07/07/17 3-3/16'LNR,6.2#,L-80 TCI, 10606' 2' 6 10660-10670 0 11/23/16 .0076 bpf,ID=2.80' 2' 6 10710-11080 S 11/08/05 07/02/12 2" 6 11130-11230 S 11/08/05 07/02/12 2" 6 11360-11430 S 11/08/05 07/02/12 2" 6 11500-11790 S 11/08/05 07/02/12 2' 6 11820-11900 S 11/08/05 07/02/12 PBT4;:. 2" 6 11930-12060 C 11!08105 2-7/8"LM,6.169,L-80 STL,.0058 bpf,D=2.441' H 121547 •• DATE REV BY CONANTS DATE REV BY CONVENTS FiU) OE BAY U T ? ORIGINAL COMPLETION 12/15/14 Jt&JMD PUl®DSSSV(12/11/14) WELL E-218 12/22/97 JLM SIDETRACK COMPLETION 11/02/16 NUJMD C ORRECTED FB F DEPTHS PEDANT No:"2051470 11/09/05 Nordic/ CTD SIDETRACK 11/30/16 JJUJMD ACFERFS&SET CUP(1123/16) API Pb: 50-029-20577-02 06/29/12 FIKT/JMD DH CHOKE PILLED(06/26/12) 07/10/17 BTTYJMD ADPERFS(07/07/17) SEC 6,T1114,R14E,1633'FM.&883'V . 07/11/12 T P/WJMD PERF SOZ AND ASH(07/02-04/12) 03/24/14 JMM"JM)SET DSSSV(12/30/13) BP Exploration(Alaska) RECEIVED • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION ,-1,6,N 0 4 2017 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed AO Abandon 0 PlugPerforations m Fracture Stimulate � n 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate ❑ Alter Casing 0 Change Approved Program I=1Plug for Redrill El Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: c '/tI° 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 205-147 3. Address: P.O.Box 196612 Anchorage, Development El Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-20577-02-00 7. Property Designation(Lease Number): ADL 0028304 8. Well Name and Number: PRUDHOE BAY UNIT E-21B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12159 feet Plugs measured 10690 feet true vertical 9016 feet Junk measured 12085 feet Effective Depth: measured 10690 feet Packer measured 9744 feet true vertical 8989 feet Packer true vertical 8299.39 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 38-118 38-118 Surface 2660 13-3/8"72#L-80 36-2696 36-2696 4930 2670 Intermediate 9847 9-5/8"47#L-80 34-9881 34-8417 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10660-10670 feet 10710-11080 feet 11130-11230 feet 11360-11430 feet 11500-11790 feet 11820-11900 feet 11930-12060 feet True vertical depth: 8974-8980 feet feet 8996-9009 feet 9010-9015 feet 9020-9017 feet 9010-9004 feet 9004-9006 feet 9007-9007 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 32-9800 32-8347 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCOW A R o g 2.017 SCA 1 ti 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 300 22603 14 920 799 Subsequent to operation: Shut-In 160 2000 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations (d Exploratory 0 Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature ( i Phone +1 907 564 4424 Date 1/3/17 1 Form 10-404 Revised 5/2015 / L.,//b77 �rt— Z/ J(e ( RBDMS Lt- JAN Z 5 2017 Submit Original Only aO m0 0 0 0 a� 0 w co � � o 0 p N VLO L ti V O M O� .7 .7 M M m CO OBD M co r 0 O 0) N N N N 0 r— O O Or-- vCr CO Cr a) I'- a) O co N CO CO a) 00 CO a) CO H LO CO0) NN CO CO N CO ct N N N MMM [ha) coN- N- 0) CO M/ N N- CO CO CO 00 ♦+ W 0 O �- 0 Cf) O O • N � coaochCD CO CO rnry) oo CO L,+ W N rr O cu . C I I I I I I I I I I ZZ C l!) Ln d' a) co CO 0) Lo � co M ( N co 0) 0 0 0 M = Q< ,- ,-• ,- a3 ~_ O• w O O 0 0 0 o ° coJ00 00 J 00 00 I 0)I dC N * JJ NcDCCOO N D N X N- (V O CO (Ni co a NM � � � (VNr- OON I I I I Ch Ch N t O co .4- L N .4- M Cco O J co Co a0) co 0 CN. oN- r) N a- co W c c• � Wa •y0Uw U au_ CCCLCLIYCLCLCLZ Z W W W W W W W O D F Z Z Z Z Z z D O Cn Z J J J J J J I • • Packers and SSV's Attachment PRUDHOE BAY UNIT E-21B SW Name Type MD TVD Depscription E-21B TBG PACKER 9743.76 8299.39 4-1/2" Baker S-3 Hydro Set Packer E-21B PACKER 9794.42 8342.68 4-1/2" Baker ZXP Packer - • 0 w w I O 0 \ 00 00 2 2 O (0 17 -10 I-= 2 / � � 00 / f , 2 ZE � ck / IL / 0 ƒ W 0 / ƒ / « ii ƒ Z ! O / 0 | 0 r Z 2 a / S woRm CD u_ 2 / G / Zce 2O� (Duj— I-- Lu 0 22 ¥ � Lam ¥ 0 0 � z Z _ m L 0 _ . c 9 2 a_ a � / -1E 2K2 > % O 0 th � � � k / X � � wb E / 9 000 ¥ 2p� u_ D = O �� me H 7 _ ce u o R I .----:1- « w E 222 O � R �¥ 0 Q � ce � � � oo / aL ow � o \ c � / / 0_ 6 w2 = I- & 2 ^ 0b & 0 O2 1-- a - / - - 50P . % R � 9m _1w $ 2 - � f � b � 22 22 / �w 00 LU 5 O = O � U < ° ® / co / � k20 / u a2 0z p L z & z o ; c O 0 c R _/ oO 00CD � 011k aL° HI -J aX 220 > J x $ / \ / Sw OP b � Rm ƒ < II r- I- 0 >t � k � abc@@ / 0H — wO oiL -cu � 222 & « O20000O 2w au ci ƒ Rwbb � k � \ -J / a . h \ q2u < o ¥ 0 _z n Ct 0 2 w O o o w Z • / / Z / / w ? J O 7 ' 32F- / - 2 \ 7210N— ZO— \ � / kms __J_J ƒ 'IWm ~ / E LH Hww `- � w .- 22w $ S -IC° bc8b * R.* - DD8Diww < < ƒ R $ i 0 .- 0 : i � 2 o_ CL b k ƒ A 3 t 0 & \ c CO / O E. CO / dq P 0 .- « TRO==r 4-1/2"5M CNV • V4l3LI-EAD= FMC SAFETY NOTES: WB.LANGLE>—70"@ 10700'. ACTUATOR= BAKER E 21 B 3-1/2"X NIPPLE IS NOT ACCESSIBLE DUE TO OKE.B EV= 59.18 2.355"SEAL ASSY ID BF.B-EV= 32.08' KOP= 3006' Max Angle= 96' r., 11448' 2219' --14-1/2"I£S F-0(O SSSV LANDNG NP, Datum MD= 10499 C=3.813" Datum TV D= 8800'SS TOP OF 7"TIEBACK LIR H 2419' 13-3/8"CSG,72#,L-80,D=12.347" H 2691' GAS UFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 4435 4261 39 CAM OMY NT 0 12/09/03 Minimum ID=2.365" 10273' J 1 7837 6868 46 CAM DMV NT 0 12/09/03 NDTE LATCHES ON GLV#1 8 2 ARE STRIPPED 3-1/2" LTP w/SEAL ASSY 9731' —{4-1/2"HES X NP,13=3.813" TOP OF 7"UR H 9370' 9741' —T X 4-1/2"BKR S-3 R(R,D=3.875" 9764' H -1/2"FESXNP,D=3.813" ' 9785' 4-1/2" 05) XN NP,MLLED (10/29/05)D 3.80" 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" -1 9798' j I 9798' —{4-1/2 VYLEG,D=3.958" 9789' H amp TT LOGGED 01/13/98 A , 9794' --17"X 4-1/2"BKR ZXP PCR,D=4.438" 9-5/8"CSG,47#,L-80,D=8.681" —I 9877' 7"LNR 26#,L-80,.0383 bpf,13=6.276' H 10675' i.�.• 10273' H 3-1/2'LNR TOP PKR w/SEAL ASSY,D=2.355' ........ 10279' 3.70"BKR DEPLOY SLV,13=3.00" 41.it.1.+, 44..51, FALLOUT rDOW(E-21A) 9945'-9951' 44�� �W�.�V�4 VU1 1 10300' HTOP OF CEMENT 10321' —13-1/2-FES X NP,D=2.813' 3-1/2"LNR,8.81#,L-80 SR,A080 bpf,13=2.992" H 10353' 1 F1 10353' I-13-1/2"X 3-3/16-XO,13=2.867" 1 W-W'STOCK --I10400' FALLOUT WINDOW(E-21 B) 10400'-10407' , RA TAG —1 10409' IN s`. 4-U2"BKR CBP(10/28/05) --I 10450'ElM 10606' H 3-3/16"X 2-7/8"XO,D=2.441" 4-1/2"LNR 12.6#,1-80_0152_0152 bpf,D=3.953" --I 13487 1) ` 10691' —{2-7/8'%NM CEP(11/23/16) \ 85'CID PERORATION SUMMARY , REF LOG: SINS MBA CN-ON 11/07/05ANGLEATTOPP :58"@ 10660'Note:Rfer to Production DB for htorical pert data —FISH MLLEDSIZE SR= NTBVAL Opn/Sgz SHOT SO7 CBP(07/04/12) 2" 6 10660-10670 O 11!23/163-3/16"LN ,6.2#,L-80 TCI, 10 2" 6 10710-11080 S 11/08/05 07/02/12 .0076 bpf,D=2.80" 2" 6 11130-11230 S 11/08/05 07/02/12 2" 6 11360-11430 S 11/08/05 07/02/12 Si 2" 6 11500-11790 S 11/08/05 07/02/12 2" 6 11820-11900 S 11/08/05 07/02/12 w 2" 6 11930-12060 C 11/08/05 MID H 12118 i`�► 2-718'LNR, H • 6.16#,L-80 STL,.0058 bpf,ID=2.441" 12154' DATE REV BY COMMENTS DATE REV BY COMMBJTS PRWHOE BAY UPR' ? ORIGINAL COMPLETION 12/15/14 JNNJMD RATED DSSSV(12/11/14) WB-L E-218 12/22/97 JIM SIDETRACK COMPLETION 11/02/16 NJJMD CORRECTED PERF DEPTHS PERMIT No:"2051470 11/09/05 Nordic! CTD SIDETRACK 11/30/16 JJUJMD ADPERFS&SET CEP(11/23/16) AR ND: 50-029-20577-02 06/29/12 RKT/JMD DH CHOKE KILLED(06/26/12) SEC 6,T11 N,R14E,1633'FM_&883'WEL 07/11/12 TTW/JMO PERF SQZ AN)FISH(07/02-04/12) 03/24/14 JMIiNJMD SET DSSSV(12/30/13) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ©~- .~ ~ ~ Well History File Identifier Organizing (done> RESCAN ~olor Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: BY: _ Maria Project Proofing ~,~.,a~ iuimiiuiiuuii DIG/fI~TAL DATA ~iskettes, No. ^ Other, No/Type: Date: ~/ ~ 7~ ~ 8 BY: f Maria Date: ~~ Scanning Preparation ^~ x 30 = BY: Maria Date: a 1 Production Scanning + ~ =TOTAL PAGES__~~ (Count does not include cover sheet) /s/ Stage 1 Page Count from Scanned File: _i~ (Count does include cov r sheet) Page Count Matches Number in Scanning Preparation: YES NO 8Y: Maria Date: ~I / [~ ~ $ /s/ Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II fI II I I~ II I I III ReScanned (I I I~ ~I II I11II I I III BY: Maria Date: /s/ Comments about this file: ~g a„~,~~eea.a iiiumisiuiuii OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: /s! /s/ o ~ ~,~~ea iiuiiimiigmu fl 10/6!2005 Well History File Cover Page.doc STATE OF ALASKA RECEIVED ALSt OIL AND GAS CONSERVATION COMAION AUG 0 9 2012 REPORT OF SUNDRY WELL OPERATIONS OGCC 1. Operations Abandon ❑ Repair Well U Plug Perforations U Perforate ❑ Other Li Performed: Alter Casing ❑ Pull Tubing ❑ Stimulate - Frac ❑ Waiver ❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Stimulate - Other ❑ Re -enter Suspended Well ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development El Exploratory ❑ ` 205 -147 -0 3. Address: P.O. Box 196612 Stratigraphic ❑ Service ❑ 6. API Number: , Anchorage, AK 99519 -6612 50- 029 - 20577 -02 -00 7. Property Designation (Lease Number): 8. Well Name and Number: . ADL0028304 PBU E -21B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 12159 feet Plugs measured None feet true vertical 9015.68 feet Junk measured 12085 feet Effective Depth measured 12118 feet Packer measured See Attachment feet true vertical 9010.37 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 77 20" Conductor 33 - 110 33 - 110 0 0 Surface 2660 13 -3/8" 72# L -80 31 - 2691 31 - 2690.85 4930 2670 Intermediate None None None None None None Production 9848 9 -5/8" 47# L -80 29 - 9877 29 - 8413.56 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet 2U1') :.gl AU G 2 `- True Vertical depth See Attachment feet Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 27 - 9798 27 - 8345.75 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 115 11544 2 1768 Subsequent to operation: 1018 9470 103 176 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development 0 r Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil _ Q Gas ❑ WDSPL 0 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Prepared by Nita Summerhays 564 -4035 Printed Name Nita Summerha Title Petrotechnical Data Technician Signatu - s £ ,/ Phone 564 -4035 Date 8/9/2012 t- F Form 10 -404 Revised 10/2010 4/i& //1--- ��� ' �L Sub Oria g inl Onl 'b kv DMS AUG 1010 i 4 v • Daily Report of Well Operations ADL0028304 ACTIVITYDATE ( SUMMARY * ** *WELL S/I ON ARRIVAL * ** *(pre ctu) DRIFT W/ 2' 1 -7/8" STEM, 3.85" GAUGE RING TO 4 1/2" DH -CHOKE @ 2196' SLM (2219' MD) PULL4 1/2" DH -CHOKE FROM SSSV NIP @ 2196' SLM (2219' MD) DRIFT W/ 2.250" CENT, 1 1/2" S.BAILER TO DEV. @ 10,696' SLM 6/26/2012 *""WELL LEFT S/I ON DFEPARTURE, PAD OP NOTIFIED ON WELLL STATUS *"" CTU # 9 w / 1.75" ct. Job objective Drift & tag / jewelry log /set Composite plug / acid treatment / OrganoSeal squeeze crete squeeze. MIRU. RIH and drift dry to 12092ft eCTM (12112ft mCTM) with 2.25" JSN BHA. Tried to jet deeper - no progress. While POOH observed hang ups. Jetted to the bottom perforations two times. POOH above liner top, still have some weight fluctuations at 11700- 11750ft interval. Cementers arrived, RU and PT. Pumped 38bbls NH4CI down coil. WHP at 2bpm while pumping down CT - 1200psi. Pumping NH4CI down BS. 6/30/2012 «< Job in progress »> CTU # 9 w / 1.75" ct. Job objective Drift & tag / jewelry log /set Composite plug / acid treatment / OrganoSeal squeeze Crete squeeze. «< Continue WSR from 6/30/12 »> RIH w SLB GR / CCL in a 2.20" carrier Log from 12099' to 9600' , flagged at 12000ft and POOH. MU Baker 2.11" CBP setting BHA and RIH. At flag corrected depth to 12021.74ft, PU to 11920ft, launched the ball. Pumped 60bbls KCI, pressure increase was not indicated. Applied 3klbs confirmed that plug was set. PU with 33klbs - setting tool did not deattach. Started to pump while pulling with 33klbs - setting tool free. PU 50ft and tagged plug at the same depth with 3klbs. POOH, inspect setting tool: setting tool stroked, ball was recovered from ball seat. Start BOP test. 7/1/2012 «< Job in progress »> CTU # 9 w / 1.75" ct. Job objective Drift & tag / jewelry log /set Composite plug / acid treatment / OrganoSeal squeeze Crete squeeze. «< Continue WSR from 7/1/12 »> Pumped 204 bbls of OragnoSeal across perf's. Pumped 25 Bbls SqueezeCRETE. Reached squeeze pressure of 250 psi and placed 4.5 Bbls cement behind pipe. Cleanout and contaminate remaining cement to composite plug with biozan. Spot biozan across all perfs then POOH jetting at 80 %, wash all jewelry and tree. FP well with 38 Bbls of 50/50 McOH. Leave 1000 psi trapped on well. RDMO. 7/2/2012 ** *Job NOT complete, will return after maintenance to complete job * ** CTU # 9 w / 1.75" ct. Job objective Drift & tag / jewelry log /set Composite plug / acid treatment / OrganoSeal squeeze Crete squeeze. Arrived on location, MU 2.32" Milling BHA, pressure tested the well to 1500psi - good test. RIH, worked through restrictions. Tagged CBP at 11896ft. Mill CBP and pushed to bottom Cg7_12085'_ cmtd. POOH and MU nozzle for N2 lift. 7/4/2012 « <Job in the progress »> CTU #9 w/1.75" ct. Job Objective: Mill CBP /N2 Lift post Organoseal GSO. « <Continued from 7/4/12 WSR »> Displaced CT with N2 and RIH to 1000ft. Waited for mechanic to repair wellhouse manual choke. Opened choke - separator pressure 160psi, WHP 490psi - restriction in the flow line. POOH CT and flashed flowline. RIH and started N2 lifting. Work down to 6500' and while lifting with N2 (see log for details). Well stabilized. Begin to POOH. 7/5/2012 « <Job in progress »> CT #9 w/1.75" ct. Job Objective: Mill CBP /N2 Lift post Organoseal & SqueezeCrete GSO « <Continued from 7/5/12 WSR »> POOH back to surface. Monitored for production stabilization and shut in well for pop off. Cap re- installed, pressure tested and well brought back online. RDMO. 7/6/2012 «<Job Complete »> • • FLUIDS PUMPED BBLS 139 DIESEL 185 50/50 METH 54 12% HCL ACID 50 9:1 MUD ACID 472 NH4CL 285 1% KCI 181 ORGANOSEAL 25 SQUEEZE CRETE 87 BIOZAN 329 l% SL KCL 60 FRESH WATER 1867 TOTAL Casing / Tubing Attachment ADL0028304 Casing Length Size MD TVD Burst Collapse CONDUCTOR 77 20" Conductor 33 - 110 33 - 110 LINER 7532 7" 26# L -80 2419 - 9951 2418.9 - 8477.33 7240 5410 LINER 618 4 -1/2" 12.6# L -80 9789 - 10407 8338.04 - 8802.92 8430 7500 LINER 74 3 -1/2" 8.81# L -80 10279 - 10353 8728.84 - 8772.19 LINER 1548 2 -7/8" 6.16# L -80 10606 - 12154 8942.2 - 9015.02 13450 13890 PRODUCTION 9848 9 -5/8" 47# L -80 29 - 9877 29 - 8413.56 6870 4760 SURFACE 2660 13 -3/8" 72# L -80 31 - 2691 31 - 2690.85 4930 2670 TUBING 9771 4 -1/2" 12.6# L -80 27 - 9798 27 - 8345.75 8430 7500 • • 1 • • • Perforation Attachment ADL0028304 Perf Opera Meas Meas SW Operation tion Depth Depth TVD Depth TVD Depth Name Date Code Top Base Top Base E-21B 4/8/11 CKS 2219 12118 2218.91 9010.37 E-21B 5/29/11 CKP 2219 12118 2153.79 8945.25 E -21B 5/31/11 CKS 2219 12118 2153.79 8945.25 E-21B 6/26/12 CKP 2219 12118 2153.79 8945.25 E-21B 7/4/12 BPP 2219 12085 2153.79 8942.47 E-21B 3/4/11 CKS 9764 12118 8251.54 8945.25 E-21B 4/7/11 CKP 9764 12118 8251.54 8945.25 E -21B 11/8/05 PER 10720 11090 8933.84 8943.62 E-21B 7/2/12 SQZ 10720 11910 8933.84 8941.04 E -21B 11/8/05 PER 11140 11240 8945.23 8950.58 E -21B 11/8/05 PER 11370 11440 8955.07 8950.78 E -21B 11/8/05 PER 11510 11800 8944.34 8938.81 E -21B 11/8/05 PER 11830 11910 8939.56 8941.04 E -21B 11/8/05 PER 11940 12070 8941.7 8942.08 AB ABANDONED MIR REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP PULLED MLK MECHANICAL LEAK BRIDGE OPEN BPS PLUG SET OH HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF • i Packers and SSV's Attachment ADL0028304 SW Name Type MD TVD Depscription E -21 B PACKER 9741 8231.91 4-1/2" Baker S -3 Perm Packer E -21 B PACKER 9794 8277.2 4 -1/2" Baker ZXP Packer E-21B PACKER 10273 8660.07 3 -1/2" Liner Top Packer r TREE = 4-1 /2" 5MCMI WELLHEAD= FMC • SM./NOTES: WELL ANGLE> -70' @ 10700'. ACTUATOR = BAKEER IR— E 3 -1/2" X NIPPLE IS NOT ACCESSIBLE DUE TO KB ELEV = 65 1 , 2.355" SEAL ASSY ID BF. ELEV = 32.08' ' - ' KOP = 3006' Max Angle = 96' ® 11448' I 2219' H412" SSSV LANDING NIP, ID = 3.813" 1 Datum WO= 10499 • Ibtum TVD = 8800' SS 'TOP OF 7" TIEBACK LNR H 2419' ' 1 13 -3/6" CSG, 72#, L -80, ID= 12.347" 2691' GAS LIFT MANDRELS ST NO TVD DEV TYPE VLV LATCH PORT DATE 2 4435 4261 39 CAM DMI' INT 0 12/09/03 1 7837 6868 46 CAM DMY INT 0 12!09/03 Minimum ID = 2.366" @ 10273' NOTE LATCHB ON GLV#1 1;2 ARE STRIPPED 3 -1/2" LTP w/SEAL ASSY 973V I--i4 -1/7' HES X NIP, ID = 3.813" I I TOP OF T' LNR H 9370' I 9741' HT' X 4 -1/7' BKR S-3 PKR, ID= 3.875" I 9764' 1- 14117' HES X NIP, ID = 3.813" 1 P 9785 I- 4-1/2" HES XN NIP, MILLED A (10/29!05) ID = 3.80" 1 4-1 /7' TBG, 12.6#, L -80, .0152 bpf, ID = 3.958" H 9798' I - 1; I 9798' H4-1/2 WLEG, ID = 3.958" ` '1 I 9789' H ELND TT LOGGED 01/13/98 I • • 9794' HT' X 41 BKR ZXP PKR, ID = 4.436" I 1 95/8" CSG, 47 #, L -80, ID = 8.681" H 9877' I A • I 7" LNR, 260 L -80, .0383 bpf, ID= 6.276" H 10675' if 1 .40 f 10273' 3 -1/2" LNR TOP PKRw /SEAL ASSY, ID= 2.355" ., • # 0 . 0 . 4 . 4 I 10 10279' H3.70" BKR DEPLOY SLV, ID = 3.00" I MLLOUT WINDOW (E -21A) 9945 - 9951' 4�4sSii.47.vojij I 10300' H TOP OF CEMENT I ' WA 1 !, 10321' H3 -1/2" HES X NIP, D = 2.813' I 13-1/2" LNR, 8.810, L -80 STL, .0080 bpf, ID = 2.992" H 10353 a 'f 10353' H3 -1 /2" X 3 -3/16" X0, ID = 2.887" 1 WHIPSTOCK H 10400' MLLOUT WINDOW (E-21 B) 10400' - 10407' alas 10409' 14-1/2" BKR CIBP (10/28/05) I 10450' ELM 1 4-1/2" LNR, 12.6 #, L -80, .0152 bpf, ID = 3.953" H 13487' ., 10606' 3- 3/16" X 2 -7/8" XO, ID = 2.441" PERFORATION SUIVMARY i REF LOG: SWS MEN CNL ON 11/07/05 •�•� ANGLE AT TOP PERF: 88' ® 11940' 1.!.1.1.1.1 1 12085' CTMD FISH MILLED Note: Refer to Reduction DB for historical pert data Pr CBP (07/04/12) SIZE SPF INTERVAL OprJSgz CATS 3- 3/16" LNR, 6.20, L -80 TCII, 10608' 2" 6 10720 - 11090 S 07/02/12 2' 6 11140 - 11240 S 07/02/12 0076 bpf, ID = 2.80" 2" 6 11370 - 11440 S 07/02/12 2' 6 11510 - 11800 S 07/02/12 2" 6 11830 - 11910 S 07/02/12 2' 6 11940 - 12070 0 11/08/05 IpBTp H 12118' ��y+ I2 -7/8" LNR, 6.160, L -80 STL, 0058 bpf, ID = 2.441" H 12164' DATE REV BY COMMENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT ' ? ORIGINAL COMPLETION 06/01/11 CJN/ PJC C10 CHOKE (5/31/11) WELL: B21B 12/22/97 JLM SIDETRACK COMPLETION 06/29/12 RKT /JND DH CHOKE PULLED (06/26/12) PERMIT No: '051470 11/09/05 Nordlc1 CTD SIDETRACK 07/11/12 TTW /JNO PERF SQZ AND FISH (07/02 - 04/12; AR No: 50- 029 - 20577 -02 11/15/05 RAC/7LH DRLG DRAFT CORRECTIONS SEC 6, T11 N, R14E, 1633' FNL 8,883' WEL 03/06/11 SET /PJC SET DH CHOKE (03/04/11) 0428/11 WEC/PJC PULL/ RESET DH CHOKE (4/6/11) BP Exploration (Alaska) • 03/12/08 ~~~I~~U~h~~r Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ ..., n~~...:..~:,.., NO. 4629 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay,Endicott nsre a~ c„i... en C-178 12031461 USIT 9t 03/09/08 1 1 1-67/T-20 12014001 USIT - L ~ 03/09/08 1 1 E-216 11661157 MCNL ~' ~' 06/19/07 1 1 02-356 11216177 MCNL ~ 02/09/06 7 1 C-34A 11216194 MCNL - ~ ~ 05/11/06 1 1 G-08A 11628761 MCNL ~ ~ 05/11/07 1 1 04-01A 11661146 MCNL 05/15/07 1 1 PLEASE AGKNVWLEUtat HtGtIPI t3Y SIGNING AIVU lit I UlirvIIVG VIVt GVY7 tHGr1 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center 1R2-1 900 E. Benson Blvd. - ~` ° - Anchorage, Alaska 99508 Date Delivered: ~ I' S8 ° k'- `~ ~~-A~~r; Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283 ATTN: Beth Received by: • • • • WELL LOG TRANSMITTAL To: State of Alaska February 28, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs : E-21B AK-MW-4018758 E-21B: 2" x 5" MD RESISTIVITY & GAMMA RAY Logs: 50-029-20577-02-00 2" x 5" TVD RESISTIVITY & GAMMA RAY Logs: 50-029-20577-02-00 Digital Log Images: 50-029-20577-02-00 ~~~~~ MAR ~ 9 200 1 Color Log 1 Color Log 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anc~ora~e, ~~1laskaV 99518 Date: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: WELL LOG TRANSMITTAL To: State of Alaska ~~ Ft,a2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian ~ y ~ ~ ~ e 333 West 7th Avenue, Suite 100 . ` , ,~ > ~ ~a ~ ., , Anchorage, Alaska 99501 , ~ y, , ,~, a RE: MWD Formation Evaluation Data: E-21B AK-MW-4018758 1 LDWG formatted CD rom with verification listing. API#: 50-029-2057702-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~~. Date: ° _~ . .'~ ~'~' BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: _ ~N~ MAR ~ 9 2008 ~vS- iy~ '~ /593 p t ~~-~-- DATA SUBMITTAL COMPLIANCE REPORT 1 /29/2008 Permit to Drill 2051470 Well Name/No. PRUDHOE BAY UNIT E-21 B MD 12160 TVD 9016 REQUIRED INFORMATION Completion Date 11/9/2005 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20577-02-00 Completion Status 1-OIL Current Status 1-OIL UIC N Mud Log No DATA INFORMATION Types Electric or Other Logs Run: MWD GR / EWR, MPL / GR /CCL /CNL Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name D Asc Directional Survey wog Production I ~ C Las 15521 Gamma Ray E C Lis 15789 Neutron Neutron Wefl Cores/Samples Information: Interval Name Start Stop ADDITIONAL INFORMATION Well Cored? i N Chips Received? ~.~Gl~l.r-~ Analysis ~F~F-PI-~ Received? Comments: Samples No Directional Su ey Yes (data taken from Logs Portion of Master Well Data Maint Log Log Run Interval OH / Scale Media No Start Stop CH Received Comments - 10393 12159 Open 1/9/2006 5 Blu 1 10120 12110 Open 7/3/2007 Mem PPL, GR, CCL, Temp, Pres, Spin 19-Jun- 2007 9602 12049 Open 10/3/2007 CCL, FCNL, GR, NCNL w/EMF and PDS graphics 9606 12011 Case 12/21/2007 LIS Veri, GR, CNT w/PDS and TIF graphics Blu 9700 12140 Case 12/21/2007 MCNL Lee, GR, CCL, CNL, 7-Nov-2007 Sample Set Sent Received Number Comments Daiiy History Received? ;,~--'-N Formation Tops Y / N DATA SUBMITTAL COMPLIANCE REPORT 1 /29/2008 Permit to Drill 2051470 Well Name/No. PRUDHOE BAY UNIT E-21 B MD 12160 TVD 9016 Completion Date 11/9/2005 Compliance Reviewed By: ______ ___---___- Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20577-02-00 Completion Status 1-OIL Current Status 1-OIL ( UIC N Date: ~_~~-VI ~~~~~~ _~ 12(19(07 I• ~~hlamt~er~er NO, 4525 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Milne Pt., Lisburne Well Jnh # Inn naccrin4inn rhfn RI Cnlnr Cn 15-39A 11661174 MCNL '~ ~'- 09/24/07 1 1 14-32 11676961 RST 09/14/07 1 1 X-30A 11649992 CH EDIT PDC GR (JEWELRY LOG '"}j I y 10/06/07 1 03-36A 11745217 CH EDIT PDC GR (USIT) ( U1'~- 05/03/07 1 15-30A 11767139 MCNL 09/05/07 2 1 18-126 11216204 MCNL 07/04/06 2 1 E-216 11133205 MCNL -/L~ ~y' 12/07/05 2 1 P2-56 11686777 RST - 08/08/07 2 1 H-33 11686792 RST CjL ,,. ~ 10/20/07 2 1 06-16 11686797 RST '- < 11/15/07 2 1 L2-16 11626482 RST 05/10/07 2 1 D-226 11661167 MCNL Q j$ 08126(07 2 1 03-14A 11212846 CH EDIT SDCL GR (USIn ~~(y ~ OS g ( 04/24/06 2 1 MPB-21 PROD 11628749 MCNL (MEM PPROF) ~ ~ -~3 ~ `,~'~ j ~, 01115/07 2 1 C-22A 40013486 OH MWD/LWD EDIT (~ -Q 2 ~ ~ 05/10/06 2 1 E-15C 40013555 OH MWD/LWD EDIT p - !o(~ '~ 'a-~(~ 06/03/06 2 1 r~cnac n~.nr~IJVV~cvvc 7[Cl.Clr 1 Oi JIb n11rvV An1U KCIUKIVINV VIVt I.VYY tHI:M I U: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~ ~ ?~~', ; ~( , I ~! ~ ~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: Date 09-28-2007 Transmittal Number:92905 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) have anv questions, please contact llou~las uoncn at me rui. ar oo~-~+y r ~ Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 02-35B ~O~o'U6c1 ~ I.SStg 07-07B ~U ~ -0`ZSj # i S51(O aF ('~ C-166 ~p(~-O5 l 155 C-34A ~OCo-C73~- # GSti~`6 E-21 B c~C3 ~ l~~ ~l Jr`~a 1 IIG-06A 2D Co -bf c`~ ~ l ;$"Sa`~ 10C ad(a-00°! ~ 15J~ Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 • Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Jeb # r III ~e 1[~ Loa Dpsrrintion N0.4324 Company: State of Alaska Alaska Oil 8 Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Dafa Ht_ Cnlnr CD 06/29!07 H-13 11676950 GAS ENTRY SURVEY 06!20/O7 C-41 11801077 LDL 06!19!07 A-30A 11661159 MEM PROD PROFILE 08/23/07 1 W-21A 11661140 MEM PROD PROFILE 04/21/07 1 E-218 11667157 MEM PROD PROFILE 06/19/07 1 M-23 11626107 PRODUCTION PROFILE 06/23!07 1 01-21 11824330 PRODUCTION PROFILE 06/22/07 1 J-25A 11767130 MEM PROD PROFILE 06/18/07 1 Z-08A 11630483 GLS/PROD LOG 06lZ2I07 1 M-34 11824330 PRODUCTION PROFILE 06/22/07 1 02-308 11594512 LDL 06/23/07 1 Z-29 11686758 PRODUCTION PROFILE 06/15!07 1 S-38 11801078 LDL 06/20/07 1 H-37A 11594506 PPROF/1PROF (REVISED) 06/05/07 1 N-15 11637129 PROD PROFILE (REVISED) 06!13/07 1 Z-13A 11649962 MEM PROD PROF (REVISED) 04121/07 1 P2-15A 11594511 SCMT 06/15/07 1 12-05 11676951 USIT (CEMENT) 06/24/07 1 12-05 11676951 USIT (CORROSION) 06(24!07 1 B-15 11626097 USIT 06/14/07 1 G-24A 11628750 SCMT 02/05/07 1 r LCA.IC: Na.nnlvvvL.cVVe RCa.CiF'I CST SI{a fYlnV ANU Kt1UKNINCi UfVt GUYT tAGF1 IU: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: _, ~ ~ ~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COM3lON WELL COMPLETION OR RECOMPLETION REPORT AND LOG ia. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zaAAC zs.~os zaAAC zs.»o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 11/9/2005 12. Permit to Drill Number 205-147 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 10/30/2005 13. API Number 50-029-20577-02-00 4a. Location of Well (Governmental Section): Surface: ` ' 7. Date T.D. Reached 11/6/2005 14. Well Name and Number: PBU E-21 B 1633 FNL, 883 FEL, SEC. 06, T11 N, R14E, UM Top of Productive Horizon: 4609' FNL, 41 i 1' FEL, SEC. 06, Ti 1 N, R14E, UM g, KB Elevation (ft): 65.12' 15. Field /Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool Total Depth: 3872' FNL, 2960' FEL, SEC. 06, Ti 1 N, R14E, UM 9. Plug Back Depth (MD+TVD} 12118 + 9010 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664100 y- 5975423 Zone- ASP4 10. Total Depth (MD+TVD) 12160 + 901 Ft 1 Designation: 028304 _ _ TPI: x- 660948 y- 5972377 Zone- ASP4^ Total Depth: x- 662080 Y- 5973139 Zone- ASP4 11. Depth where SSSV se - ski N/A MD ~1~/~ 1 ~d~se ~lJ -"---~--~-- --~ ---~~- "----- "--- -- -~---- f P f t i 8. Directional Survey ®Yes ^ No 19. Water depth, if offshore NIA MSL ,~ ~kness o erma ros "~vP~ ~~ ' ~Q~h 1900' (Approx.) 21. Logs Run: MWD GR / EWR, MPL / GR / CCL / CNL ~ 2. CASING, LINER AND EMENTING RECORD CASING ETTING EPTN MD ETTINCi EPTH TVD HOLE MOUNT $IZE WT. PER F7. GRADE OP TTOM OP TTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" cu ds Concrete i3-318" 72# L-80 Surface 2691' Surface 2691' 17-1/2" 3720 cu ft Arcticset II 9-518" 47# L-80 Surface 9875' Surface 8412' 12-1l4" 1351 cu ft Class 'G' 130 cu ft AS I 7" 26# L-80 2419' 9945' 2419' 8472' 8-1/2" 14 cu ft Class'G' 4-1/2" 12.6# L-80 9794' 10400' 8342' 8799' 6" 520 cu ft Class'G' a-vr x 3-a~~s° x zaia• a.a~u r s.za r s. ~ sa L-80 10279' 12154' 8729' 9015' a-3/a• X a-ua° 144 cu ft Class 'G' 23. Perforations open to Produc tion (MD + TV D of Top and " " 24. TUBING RECORD Bottom Interval, Size and Number; if none, state none }: SIZE DEPTH SET (MD} PACKER SET (MD} 2" Gun Diameter, 6 spf 4-1I2", 12.6#, L-80 9798' 9741' MD TVD MD TVD 10720' - 11090' 8999' - 9009' 11140' - 11240' 9010' - 9016' 25: ACID, FRACTURE, :CEMENT SQUEEZE, ETC. 11370' - 11440' 9020' - 9016' 11510' 11800' 9009' 900 ' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED - - 4 11830' -11910' 9005' - 9006' 2500' Freeze Protect with McOH 11940' - 12070' 9007' - 9007' 26. PRODUCTION TEST Date First Production: November 28, 2005 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date Of Test 12/25/2005 Hours Tested 4 PRODUCTION FOR TEST PERIOD OIL-BBL 284 GAS-McF 3,184 WATER-BBL 3.5 CHOKE SIZE 95.18° GAS-OIL RATIO 11,218 Flow Tubing Press. 1,50 Casing Pressure 900 CALCULATED 24-HOUR RATE OIL-BBL 1,703 GAS-MCF 19,105 WATER-BBL 21 OIL GRAVITY-API (CORK) 27.5 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". r .. ~Dt~S ~F~ ..i n ~,` ~ ~6 d~uJ,~~ u.) /dJ 7"OS .a~~ None 111 =ir:~ g ga 2, Tv0 ;< I-~; Form 10-407 Revised 1212003 CONTINUED ON REVERSE SIDE 28. GEOLOGIC MARKERS 29' ORMATION TESTS lncfude and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Zone 2 A / 21TS 10529' 8887' None Zone 1 B 10610' 8945' Zone 1 A J TDF 10682' 8985' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the forego'ng is true and correct to the best of my knowledge. 11 ~1q Signed Titl l A i t D T i t `~~~ a e e echn ca ss stan 1 Terrie Hubble PBU E-21 B 205-i 47 Prepared By NamelNumber• Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Barbara Holt, 564-5126 INSTRUCTIONS GeNean~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 6: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). 1reM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Irene 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 1212003 Submit Original Only C BP EXPLORATION Operations Summary Report Page 1 of 8 Legal Well Name: E-21 Common Well Name: E-21 Spud Date: 1 i/4/1981 Event Name: REENTER+COMPLETE Start: 10/28/2005 End: Contractor Name: NORDIC CALISTA Rig Release: 11/9/2005 Rig Name: NORDIC 1 Rig Number: N1 Date j From - To i Hours j Task ~ Code ~! NPT ~ Phase ~ Description of Operations 10/28!2005 11:30 - 12:00 0.50 RIGD P PRE Rig released from P-06B @ 11:30Hrs on 10/28/2005. Prep to move rig to E-pad. 12:00 - 12:15 0.25 MOB P PRE PJSM for moving rig off well. 12:15 - 12:30 0.25 MOB P PRE Held pre-move safety meeting with crew, security & tool services. 12:30 - 13:00 0.50 MOB P PRE Jack-up rig & pull rig off well. Conduct post-operations pad inspection. 13:00 - 00:00 11.00 MOB P PRE Move rig from P-pad to E-pad. 10/29/2005 00:00 - 00:30 0.50 MOB P PRE Move rig from P-pad to E-pad, spot rig over Well E-21, Accepted rig at 00:30 hours on 10/29/05 00:30 - 02:30 2.00 BOPSU P PRE NU BOP's, level rig 02:30 - 03:15 0.75 BOPSU P PRE RU test equipment, attempt to Test BOPS, tree valves not holding 03:15 - 04:00 0.75 BOPSU N SFAL PRE Waiting on grease truck to service valves, Spot and RU tiger tank, PR lines 04:00 - 10:00 6.00 BOPSU P PRE Testing BOPS, all rams, lines and valves f/ 300 - 3500 psi for 5 min each, Annular 250 - 2500 psi, for 5 mins each, Performed Koomey test. BOPE PT witnessed by BPXA WSLs. John Spaulding w/ AOGCC waived witnessing BOP test. 10:00 - 10:15 0.25 WHIP P WEXIT SLB insert 2 RA pip tags into WFD LSXN 4-1/2" monobore whipstock. RA PIP tag to TOWS = 5.88'. 10:15 - 10:30 0.25 WHIP P WEXIT Install WFD CTC & Pull test to 35k ~ OK. 10:30 - 11:45 1.25 WHIP P WEXIT Install dart catcher. Load wiper dart. Launch & chase with 2% KCL. Dart hit @ 55.4bbls. Press test inner reel valve &CTC to 3500psi - OK. Open up well & observe Opsi WHP. IAP = 38psi. OAP = Opsi. 11:45 - 12:00 0.25 WHIP P WEXIT Held pre-operations safety meeting. Reviewed well plan, potential hazards & WS setting BHA M/U procedures. 12:00 - 12:45 0.75 WHIP P WEXIT M/U WS setting BHA #1 with WFD LSXN 4-1/2" monobore whipstock, setting adapter, hyd setting tool, BKR FAIV, Sperry MWD/GR, orienter &WFD MHA. Scribe WS tray to MWD & M/U injector. 12:45 - 13:00 0.25 WHIP P WEXIT RIH WS setting BHA #1 to 450'. Observe SLB powerpack throttle not dialing well. 13:00 - 13:15 0.25 WHIP N SFAL WEXIT Found loose Allen screw behind power pack throttle. Tighten screw & fix throttle problem. 13:15 - 16:30 3.25 WHIP P WEXIT RIH to 3000'. SHT orienter &MWD @ 1.6bpm/1150psi - OK. Continue RIH WS setting BHA #i taking diesel returns to outside tank. Wt check @ 10000' ~ Up = 48k, Down = 23k. RIH & lightly tag CIBP @ 10474'. P/U to up wt & correct CTD to 10450' (SLMD). PUH to 10105' for MWD tie-in. 16:30 - 17:00 0.50 WHIP P WEXIT Log up from 10105' to 10080' @ 1.7bpm/1520psi & tie-into Geology PDC log. Add 11' to CTD. 17:00 - 17:15 0.25 WHIP P WEXIT RBIH to 10450'. 17:15 - 17:40 0.42 WHIP P WEXIT Check TF - @ 153L. Orient TF around to 157R. PUH to 10390'. RBIH to 10413.18' with TOWS @ 10400', 4-1 /2" Lnr collars @ 10396' & 10436'. 17:40 - 17:50 0.17 WHIP P WEXIT Circ @ 2.93bpm/4270 psi for 2mins. Drop pump to Obpm. Wait 3mins. Bring on pump to 1,8bpm, pressure up & shear off WS @ 1800psi. Continue pumping & observe TF of 179R. S/D pumps. Set down 2k @ 10416.1' - WS held. 17:50 - 20:00 2.17 WHIP P WEXIT POOH with WS setting BHA#1 filling the hole via the backside. Paint EOP flag @ 10000', POH to BHA Printed: 11/71/2005 2:10:48 PM • BP EXPLORATION Page 2 of 8 Operations Summary Report Legal Well Name: E-21 Common Well Name: E-21 Spud Date: 11/4/1981 Event Name: REENTE R+COM PLETE Start : 10/2812005 End: Contractor Name: NORDIC CALIST A Rig Release: 11/912005 Rig Name: NORDIC 1 Rig Number: N1 Date j From - To I J ' Hours ! ~ Task ' !Code NPT ~ i Phase ' ~ Description of Operations ------ ---- 10/29/2005 20:00 - 21:00 ---- 1.00 -- WHIP ----- P -----i WEXIT -------_ LD BHA # 1 21:00 - 21:30 0.50 STWHIP P WEXIT M/U window milling BHA #2 with a 3.80" HC DP0261 DWM, 3.80" diamond string reamer, Weatherford PDM, MHA & 2 jts of PH6 tbg (OAL - 81.16'). M/U injector. 21:30 - 23:10 1.67 STWHIP P WEXIT RIH to XN nipple, Displacing well over to Blo-KCL milling fluid w/ .64 bpm at 180 psi, Tag at 9801'. Up wt 42 K, SO wt 22 k 23:10 - 00:00 0.83 STWHIP P WEXIT Milling XN nipple at 9798' to 9799' CTM w/ 2.52 bpm at 1375 - 1600 psi 10130!2005 00:00 - 00:30 0.50 STWHIP P WEXIT Milling XN nipple to 9800' CTM w/ 2.52 bpm at 1375 - 1600 psi, worked through nipple several times with no overpulls 00:30 - 01:30 1.00 STWHIP P WEXIT RIH to TOWS at 10400', EOP at 10000' - correction -11', 01:30 - 06:30 5.00 STWHIP P WEXIT Milling 3.8" window f! 10400' to 10406' w! 2.42 bpm at 1725 psi At 02:00 hours on 10/30!05, set clock back 1 hour for daylight savings time. 06:30 - 07:30 1.00 STWHIP P WEXIT Contro{{ mill window from 10406' to 10407' with 2.4/2.4bpm, 15501i750psi & 5k WOB. Exit into formation @ 10407'. Inspected wellhead bolts and found no loose bolts/nuts. 07:30 - 11:35 4.08 STWHIP P WEXIT Mill 10' formation to 10417' with 2.4/2.4bpm, 1550/1750psi, 2.5fph ave ROP & 7k WOB. Meanwhile swap the wellbore to reconditioned (80% used/20% new) 8.6 ppg Flo-Pro mud with 3% L-T & 10ppb K-G. 11:35 - 12:35 1.00 STWHIP P WEXIT Backream/dress window/rat hole 3x & drift 2x. Window looks clean. Tentative window depths are: TOWS/TOW = 10400', BOW = 10407', RA PIP Tag = 10408.88'. 12:35 - 14:25 1.83 STWHIP P WEXIT Paint EOP flag @ 10000' & POOH window milling BHA #2, while displacing well to mud. 14:25 - 15:00 0.58 STWHIP P WEXIT PJSM. L!D BHA #2 & inspect mills. Window mill gauge 3.80" go / 3.79" no-go & string mill .gauge 3.79" go 13.78" no-go. Wear on window mill face indicated center crossed the liner wall. 15:00 - 15:45 0.75 DRILL P PROD1 Behead & MJU SLB CTC. Pull test to 35k & pressure test to 3500psi - OK. 15:45 - 16:00 0.25 DRILL P PROD1 Held pre-spud safety meeting. Reviewed well plan, potential hazards & drilling BHA M/U procedures. 16:00 - 16:30 0.50 DRILL P PROD1 M/U drilling BHA #3 with 3.3deg X-treme motor, MWD/GR, orienter & used Hycalog 3-3/4" x 4-1/4" DSX304 bicenter bit #2. Scribe tools & M/U injector. 16:30 - 17:15 0.75 DRILL N RREP PROD1 Changeout HCR control regulator in Kommey. 17:15 - 19:30 2.25 DRILL P PROD1 RIH drilling BHA#3, EOP at 10000' - -11' correction, RIH to 10360', orient to 160 degree TF, RIH through window to btm at 10417' 19:30 - 21:00 1.50 DRILL P PROD1 Orient around TF 155 L 21:00 - 00:00 3.00 DRILL P PROD1 Drill w/ a 3.3 deg mtr, survey and log wl MWD-GR f/ 10417' - 10427' wJ 2.51 bpm at 3900 psi 10/31/2005 00:00 - 06:45 6.75 DRILL P PRODi Dir Drili w/ a 3.3 deg mtr, survey and log w/MWD-GR f/ 10427' - 10450' w/ 2.67 bpm at 3800 psi, zone 2b lithology - 90% chert, 1-2% pyrite, rest cmt'd quartz 06:45 - 07:00 0.25 DRILL P PROD1 Orient TF to 110L. P/U wt = 41 k, Run-in wt = 21 k, IAP = 74psi, IAP = 88psi, PVT = 296bb1s. 07:00 - 11:10 4.17 DRILL P PROD1 Drill to 10470' with 110E TF, 2.48/2.48bpm, 3250/3550psi, 3.5k Printed: 11/11/2005 2:10:48 PM • BP EXPLORATION Page 3 of 8 Operations Summary Report Legal Well Name: E-21 Common W ell Name: E-21 Spud Date: 11!4/1981 Event Nam e: REENTER+COM PLETE Start: 10/28/2005 End: Contractor Name: NORDIC CALIS TA Rig Release: 11/9/2005 Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To ~!i ~ Hours i Task Code j NPT i, Phase Description of Operations r ------ 10/31/2005 ---- 07:00 - 11:10 --- - 4.17 DRILL --- ~--- P ----- --------- PROD1 WOB & +!-5fph ave BOP. Drilling very slow possibly due to hi motor bend andlor bit wear. Wi{I continue grinding until we can confirm DLS from surveys. 11:10 - 15:15 4.08 DRILL P PROD1 Drill to 10488' with 1 i0L TF, 2.48/2.48bpm, 3250/3550psi, 3.5k WOB & +/-5fph ave BOP. Observe MWD pulsing intermittently 3x. 15:15 - 15:30 0.25 DRILL P PROD1 Shoot off btm survey. Confirm 37degs DLS -thus 3.3deg bend is sufficient for plan. Decide to POOH to check bit. 15:30 - 17:30 2.00 DRILL P PROD1 POOH drilling BHA#3. 17:30 - 18:00 0.50 DRILL P PROD1 OOH. PJSM. L/D BHA # 3 & inspect bit ~ not chewed out, gauge 1/2/I with 2 chipped outer cutters. 18:00 - 18:15 0.25 DRILL P PROD1 Held PJSM for cutting CT. 18:15 - 19:00 0.75 DRILL P PROD1 R/U hydraulic cutter & cut 200' of CT for fatigue management. Have 14580' of CT left on the reel. 19:00 - 20:00 1.00 DRILL P PROD1 Behead & M1U SLB CTC. Pull test to 30k & pressure test to 3500psi - OK. 20:00 - 20:30 0.50 DRILL P PROD1 M!U drilling BHA # 4 with 3.3deg X-treme motor, new MWDIGR, orienter & Hycalog 3-3/4" x 4-1/4" DSX3611M bicenter bit #3. RIH w/ BHA, M/U injector. 20:30 - 22:45 2.25 DRILL P PROD1 RIH drilling BHA # 4, RIH to 10488' w/ .17 bpm at 1469 psi, increased to 2.4 bpm w/ 3400 psi once passed the window 22:45 - 23:05 0.33 DRILL P PROD1 PUH to 10445' run tie-in log to RA tags, -1.5' correction 23:05 - 23:20 0.25 DRILL P PROD1 Orient TF to 101 L at 10412', rih to btm at 10488', FS 3300 psi 23:20 - 00:00 0.67 DRILL P PROD1 Dir Drill w/ 3.3 deg mtr, sure w/ MWD-GR f/ 10488' to 10495' w1 113 L TF at 2.5 bpm w/ 3800 psi 11/1/2005 00:00 - 03:50 3.83 DRILL P PROD1 Dir Drill w/ 3.3 deg mtr, sure w1 MWD-GR f/ 10495' to 10536' w! 90 L at 2.5 bpm wf 3800 psi 03:50 - 04:20 0.50 DRILL P PROD1 Orient TF to i 15 L 04:20 - 04:35 0.25 DRILL P PROD1 Dir Drill w! 3.3 deg mtr, surv w/ MWD-GR f/ 10536' to 10542' w/ 148 L at 2.4 bpm wJ 3550 psi, ROP 23 fph 04:35 - 04:45 0.17 DRILL P PRODi Orient TF to 98 L 04:45 - 05:10 0.42 DRILL P PROD1 Dir Drill w/ 3.3 deg mtr, sure w/ MWD-GR f/ 10542' to 10546' w/ 122 L at 2.4 bpm w/ 3550 psi, ROP 19 fph 05:10 - 06:30 1.33 DRILL P PROD1 Orient TF to S7 L, Dir Drill w/ 3.3 deg mtr, surv w/ MWD-GR f/ 10546' to 10565' w/ 101 L at 2.4 bpm w/ 3550 psi, ROP 28 - 18 fph 06:30 - 08:15 1.75 DRILL P PROD1 Drill to 10585' with 105E TF, 2.40/2.40bpm, 3050l3380psi, 2k WOB & 15-20fph ave BOP. 08:15 - 08:30 0.25 DRILL P PROD1 Orient TF to 75L. 08:30 - 09:25 0.92 DRILL P PROD1 Drill to 10597' with 85L TF, 2.40/2.40bpm, 3i00/3380psi, 2k WOB & 15-20fph ave BOP. 09:25 - 10:10 0.75 DRILL P PRODi Attempt to orient on btm -not getting clicks. PUH & orient TF to 65L. 10:10 - 12:00 1.83 DRILL P PRODi Drill to 10770' with 65L TF, 2.40/2.40bpm, 305013380psi, 2k WOB & 30-35fph ave BOP. Observed a drilling break @ 10605' - could be penetrating zone-1 B. 12:00 - 13:30 1.50 DRILL P PROD1 Wiper to window. 13:30 - 17:10 3.67 DRILL P PROD1 Directionally drill from 10770' - 10775' 2.5 bpm Q 3850 psi. TF 60L TD build section. 17:10 - 20:00 2.83 DRILL P PROD1 POH for lateral drilling assembly. Tagged XN at 9785 while POH. 20:00 - 22:00 2.00 DRILL P PROD1 Swap BHA, PU restivity and dial motor down to 1.0 degrees. 22:00 - 23:00 1.00 DRILL P PROD1 RIH to 3000. Orienter fai{ed to test only getting 5 degree c-icks. Printed: 11/11/2005 2:10:48 PM BP EXPLORATION Operations Summary Report Page 4 of 8 Legal Well Name: E-21 Common Well Name: E-21 Spud Date: 11/4/1981 Event Name: REENTER+COMPLETE Start: 10/28/2005 End: Contractor Name: NORDIC CALISTA Rig Release: 11/9/2005 Rig Name: NORDIC 1 Rig Number: N1 I ~ l I ~ I Date I From - To ' Hours i Task Code I NPT , ~ I Phase i 1/i/2005 -_ 23:00 - 23:30 _- 0.50 ___ DRILL ____ N - DFAL PROD1 23:30 - 00:00 0.50 DRILL N DFAL PROD1 11/2/2005 00:00 - 00:30 0.50 DRILL N DFAL PROD1 00:30 - 01:35 1.08 DRILL P PROD1 01:35 - 02:10 0.58 DRILL P PROD1 02:10 - 02:25 0.25 DRILL P PROD1 02:25 - 02:50 0.42 DRILL P PROD1 02:50 - 03:40 0.83 DRILL P PROD1 03:40 - 04:15 0.58 DRILL P PROD1 04:15 - 05:10 0.92 DRILL P PROD1 05:10 - 08:45 3.58 DRILL N DFAL PRODi 08:45 - 09:45 I 1.001 DRILL I N I DFAL I PROD1 09:45 - 10:45 ~ 1.00 ~ DRILL ~ N ~ DFAL i PROD1 10:45 - 12:50 I 2.081 DRILL I N I DFAL I PROD1 12:50 - 13:45 0.92 DRILL N DFAL PROD1 13:45 - 14:10 0.42 DRILL N DFAL PROD1 14:10 - 15:45 1.58 DRILL N DFAL PROD1 15:45 - 16:20 ~ 0.58 ~ DRILL ~ P ~ ~ PROD1 16:20 - 17:15 0.92 DRILL P PROD1 17:15 - 18:00 0.75 DRILL P PROD1 18:00 - 20:00 2.00 DRILL P PROD1 20:00-23:00 3.OOiDRILL iP PRODI 23:00 - 00:00 1.00 DRILL P PROD1 11/3/2005 00:00 - 01:30 1.50 DRILL P PROD1 01:30 - 01:50 0.33 DRILL P PROD1 01:50 - 02:00 0.17 DRILL P PROD1 02:00 - 02:45 0.75 DRILL P PROD1 02:45 - 03:00 0.25 DRILL P PROD1 03:00 - 05:40 2.67 DRILL P PROD1 05:40 - 06:15 0.58 DRILL P PROD1 06:15 - 06:50 0.58 DRILL P PROD1 Description of Operations POH fo orienter failed shallow hole test. Change orienter. Surface test. OK. RIH to 3000'. RIH to 10142'. Tie-in to origional Gr marker correction -13'. RIH 10470'. Tii-in to RA. Corrected RA depth 10,414' RIH. No MWD signal in high DL Attempt to Directionally drill. NO MWD signal in open hole. MWD in bind. Swap to new mud. Mad pass to window. POH to BHA, tag 9806 Work thru after numerous attempts. Seeing overpuRs and pressure spikes on out pressure@ 8860,8830.8793,8750 8670 and periodically afterwards. {ooks like dragging junk??. POH, visually inspect BHA, CTC packed off w/cuttings and metal shavings, bit had some wear rings above the top of the cutting structure, no damage to the cutters or cutting structure of bit, packed off w/cuttings and metal shavings thru fluid courses. Download RES, LD RES tool and MWD MU BHA # 6, MU rerun HYC bit, 1 deg mtr, PU new MWD-GR tool, Orient, RIH w! BHA, stab injector RIH w/ BHA to 10450', shallow hole test MWD, function test orienter at 3000', overpull at 9800' w/ 60 k Run tie-in pass twice f/ 10450' to 10410' (unable to tie-in w/info reed), 2nd pass 10460' to 10428', -12' correction RIH to bottom at 10783', TF 104 L deg POH to below window at 10418', attempt to orient, no response, pull inside 4 1!2" tubing to 10326', RIH to 10445', TF at 80 L, RIH to btm at 10783' Dir Drill f/ 10783' to 10800' w/ 2.55 bpm at 3400 psi, TF at 84 L, angle dropping P/U off btm to 10773', attempt to orient, orientor not responding, POH to 10416', orient TF to 25 L, RIH to Btm at 10800' Dir Drill fl 10800' to 10846' wl 2.55 bpm at 3400 psi, TF f128-37 L, ROP at 90 fph POH while circ at 2.47 bpm, 3050 psi. POH thru 9810 area no problem. Continue to POH to surface. BHA Swap. PU new orienter, plus restivity tool. New orienter ony getting 10 degree click on surface. Decided to change it out. Same results. RIH RIH to 10475. Tie-in correction -i7'. Test Orienter. Getting 20 degree clicks one for one. RIH ~ .5 bpm 1550 psi tag TD at 10847. Madd pass TD to 10770. RIH Directionally drill 2.65/2.68 bpm @ 3500 psi. FS = 3000 psi. ROP 60 -110 Wiper to window, no hole problems Orient TF around to 114 R Printed: 11/11/2005 2:10:48 PM • BP EXPLORATION Operations Summary Report Page 5 of 8 Legal Well Name: E-21 Common Well Name: E-21 Spud Date: 1 1 1411 981 Event Name: REENTER+COMPLETE Start: 10128!2005 End: Contractor Name: NORDIC CALISTA Rig Release: 11/9/2005 Rig Name: NORDIC 1 Rig Number: N1 Date I From - To I Hours ~ Task I Coded NPT ~ Phase 11/3/2005 06:50 - 11:00 ~ 4.17 DRILL ~ P ~ I PRODI 11:00 - 11:30 0.50 DRILL P PROD1 11:30 - 15:15 3.75 DRILL P PROD1 15:15 - 16:10 0.92 DRILL P PROD1 16:10 - 20:20 4.17 DRILL P PRODi 20:20 - 20:30 0.17 DRILL P PROD1 20:30 - 23:00 2.50 DRILL N DFAL PROD1 23:00 - 00:00 1.00 DRILL N DFAL PROD1 11!4!2005 00:00 - 01:00 1.00 DRILL N DFAL PROD1 01:00 - 06:00 5.00 DRILL N DFAL PROD1 06:00 - 07:00 1.00 RIGD N DFAL PROD1 07:00 - 08:30 1.50 RIGD N DFAL PROD1 08:30 - 09:15 0.75 RIGD N DFAL PROD1 09:15 - 11:45 2.50 RIGD N DFAL PROD1 11:45 - 13:30 1.75 RIGD N DFAL PROD1 13:30-13:45 0.25 BOPSUF~N DFAL PROD1 13:45 - 15:30 1.75 DRILL N DFAL PROD1 15:30 - 18:30 3.00 DRILL N DFAL PROD1 18:30 - 20:00 1.50 DRILL P PROD1 20:00 - 21:00 1.00 DRILL P PROD1 21;00 - 00:00 3.00 DRILL P PROD1 11/5/2005 100:00 - 03:15 I 3.251 DRILL I P ! I PROD1 03:15 - 04:45 1.50 DRILL P ~ PROD1 04:45 - 07:10 2.42 DRILL P PROD1 07:10 - 09:30 2.33 DRILL N DFAL PROD1 09:30 - 10:30 i.00 DRILL N DFAL PROD1 10:30 - 11:30 i.00 DRILL N DFAL PROD1 11:30 - 14:30 ~ 3.00 ~ DRILL ~ N ~ DFAL ~ PROD1 Description of Operations Dir drill 2.52!2.55 bpm ~ 3500 psi, FS 2900 psi, ROP 50 - 75 fph Wiper to 10550', no hole problems Dir drill 2.6212.68 bpm ~ 3600 psi, FS 3100 psi, ROP 25 - 50 fph Wiper to 10525', no hole problems Orient TF to 29 R, Dir drill 2.55/2.60 bpm @ 3675 psi, FS 3100 psi, ROP 70 fph Wiper to window. Pin holed coil at 11270'. POH for new coil. LD BHA. SCR #2 problem. Which ever SCR assignment selected the equipment it assigns to SCR2 runs away. On assignment 1 Drawworks which was assigned to SCR#2 ran away. On assignment #2 pump2 which was assigned to SCR #2 ran away. Lock out SCR #2. Down load MWD. Swap out Reel due to pin hole. Stab onto well. Circulate coil to H2O & methanol. Blow down with N2. Cut off CC. Install internal grapple. Spool coil back to reel. Secure reel. Troubleshoot # 2 SCR and control panel on driller's console, flipped micro switch, SCR # 2 running fine, believe problem was in trottle ramp card and micro switch. ND hard line, prep coil and reel for CT swab Held pjsm on reel swab, C/O CT reel, note - c/o drive pins and rightside bushing f/ ops cab NU Hardline, Install and pull test internal connection Stab pipe, cut pipe, c/o packoff asst', cut pipe MU coil tubing connector, pull test, pump and test surface line to 4500 psi, install volume dart inside reel, install dart connector, Pump volume dart, calculated volume = 60.7 bbls, actual dart displacement = 58 bbls. Pressure test coil connector to 3500 psi, test inner reel valve f( 350 psi and 3500 psi for 5 minutes each Function test pipe rams and hydril, OK M/U BHA # 8 with a 4.25" HYC DSX 3611 BC bit, adjust motor to 1.2 deg, MWD-RES-GR, orient, upload RES tool, MHA, stab injector. RIH w/ Drilling BHA, tie-in f/ 10478 - 10414' @ RA tag, -17' correction, RIH to Btm Directionally drill 2.412.4 bpm @ 3300 psi. FS = 3170 psi. Will not drill. Stalling. Call for new mud. Wiper to window. Directionally drill 2.8!2.8 bpm @ 3960 psi. CT wt 6-7K, ROP 15. Directionally drill 2:8 ! 2.8 bpm @ 3680 psi. FS= 3200 psi. Ct wt 1 K, ROP 80. TF 176E Wiper to window. Set down 10700 in shale. Directionally drill 2.8 / 2.8 bpm @ 3680 psi. FS= 3370 psi. Ct wt 16K, ROP 33. TF 90L POH to BHA, MW D failure, pulser quit working POH w/ BHA, download MWD, LD orientor and MWD tools MU BHA, same bit and 1.2 deg motor, PU new MWD-RES-GR, orient, upload RES, PU orientor, RIH, stab Injector RIH w/ Drilling BHA, tie-in f/ 10478 - 10414' ~ RA tag, -21' Printed: 17/17/2005 2:10:48 PM BP EXPLORATION Page 6 of 8 Operations Summary Report Legal Well Name: E-21 Common Well Name: E-21 Spud Date: 11/4/1981 Event Name: REENTER+COMPLETE Start : 10/28/2005 End: Contractor Name: NORDIC CALISTA Rig Release: 11!9/2005 Rig Name: NORDIC 1 Rig Number: N1 Dafe iFrom-To ~iHours! Task Code NPT ~ Phase I Description of Operations - ---- ~-- --- -----! -------___-_-- --------- 11/5/2005 11:30 - 14:30 3.00 DRILL N DFAL PROD1 correction, RIH to Btm 14:30 - 15:15 0.75 DRILL P PROD1 Orient TF to 90 L, Dir drill 2.6 bpm @ 3650 psi. FS= 3100 psi. ROP 50 - 80 fph 15:15 - 15:50 0.58 DRILL P PROD1 Orient TF to 60 L, Dir drill 2.68 bpm at 3700 psi, ROP 90 fph 15:50 - 16:20 0.50 DRILL P PROD1 Orient TF around to 100 L 16:20 - 17:00 0.67 DRILL P PROD1 Dir drill 2.65 bpm at 3700 psi, ROP 90 - 13 fph 17:00 - 17:40 0.67 DRILL P PROD1 Short trip to 11650', Dir Drill 2.65 bpm at 3700 psi, ROP at 5 - 13fph 17:40 - 20:00 2.33 DRILL P PROD1 Orient TF around to 90 L drill to 11803. 20:00 - 21:30 1.50 DRILL P PROD1 Wiper to window.Set down at 11700. 21:30 - 22:15 0.75 DRILL N PROD1 Second wiper while wait on orders. Direct to drill to lower target sand. 22:15 - 00:00 1.75 DRILL N PROD1 Directionally drill 2.46 / 2.5 bpm at 3270 psi, FS = 3200 CT wt 12K, WOB 8K, ROP 58. TF 88L. Some stacking out. 111612005 00:00 - 03:30 3.50 DRILL P PROD1 Directionally drill 2.6 / 2.6 bpm @ 3775 psi FS = 3550 psi, Up Wt 40K, CT Wt 13K, ROP 30-80 03:30 - 05:10 1.67 DRILL P PROD1 Wiper to window. Clean trip. 05:10 - 13:10 8.00 DRILL P PROD1 Directionally drill 2.612.6 bpm @ 3775 psi FS = 3550 psi, had difficulty hold TF 13:10 - 15:35 2.42 DRILL P PROD1 Wiper to 10550', no hole problems, RIH tagged up at 10680', attempt to work thru, no go, orienter not responding, POH to 10414', orient TF to 101 L, RIH to 11450', work thru tight spot, RIH to bottom, note: bobble RIH at 10693'. 15:35 - 15:55 0.33 DRILL P PROD1 Orient TF around to 90 L 15:55 - 17:50 1.92 DRILL P PROD1 Directionally drill 2.5 bpm @ 3900 psi, ROP 50 fph, dropped off to 20 fph, Lithology shale 17:50 - 19:15 1.42 DRILL P PROD1 POH. Mad pass 19:15 - 19:30 0.25 DRILL P PROD1 Tie-in correction +1'. 19:30 - 20:30 1.00 DRILL P PROD1 RIH set down 10700. tag TD at 12160' MD. 20:30 - 23:15 2.75 DRILL P PROD1 POH 23:15 - 00:00 0.75 DRILL P PROD1 Down load restivity data. LD BHA 111712005 00:00 - 01:00 1.00 DRILL P PROD1 Continue LD BHA. Bit like new. 01:00 - 01:45 0.75 CASE P RUNPRD PU Baker running tools. 01:45 - 02:00 0.25 CASE P RUNPRD PJSM discussed job hazards. Specifically do not turn your back to pipe; Make sure that the elevators are in gauging the turbolator. some time they have the potential to hang up and fall back to the elevators. Don't put your hand over the end of the pipe. 02:00 - 05:30 3.50 CASE P RUNPRD PU and MU, RIH w/ liner assy 05:30 - 06:30 1.00 CASE P RUNPRD MU CTC, pull 40 K and P/T 3500 psi 06:30 - 07:15 0.75 CASE P RUNPRD Launched Vol. Dart, Actual Displ. 58.0 bbls, Cal. Displ. 60.1 bbls 07:15 - 09:00 1.75 CASE P RUNPRD Stab Inj, RIH w/ liner assy, bobbles RIH at 10680' and 11440', RIH tagged bottom at 12168', corrected back to 12160', brk circ, ok, PU Wt 43 k, SO Wt 19 K 09:00 - 10:30 1.50 CASE P RUNPRD Load 5!8" steel ball &circ with @ 1.2 bpm & 2325 psi, reduced rate to .25 bpm at 1670 psi. Set down 10k down on CTLRT. Continue circ ball to seat. Slow down @ 45 bbls away. Ball on seat @ 52.6 bbls. Pressure up to 4400 psi & release CTLRT. P/U @ 38k & confirm release. Cleaning mud pits. 10:30 - 11:00 0.50 CASE N WAIT RUNPRD Circ at .42 bpm w/ 1815 psi, cleaning mud pits while waiting on Vac trks w/ 2 percent KCL f! hot water plant. Note: Trucks were placed on wil! call 12 hours in advanced w! a 6 hour call out Printed: 11!11!2005 2:10:48 PM CJ BP EXPLORATION Page 7 of 8 Operations Summary Report Legal Well Name: E-21 Common W ell Name: E-21 Spud Date: 11/4/1981 Event Nam e: REENTE R+COM PLET E Start : 10/28/2005 End: Contractor Name: NORDIC CALIST A Rig Release: 11/9/2005 Rig Name: NORDIC 1 Rig Number: N1 Date From - To ~~ Hours j Task I Code j NPT i Phase ~ Description of Operations 11/7/2005 10:30 - 11:00 0.50 CASE N WAIT RUNPRD notice. No trucks were available at time of call out. 11:00 - 13:30 2.50 CASE P RUNPRD Circ well to 2% KCL water with double friction reducer @ 2.5 bpm w/ 2850 - 1030 psi. Send used FloPro to MI for reconditioning. R/U SLB cementers. Fill rig pits with KCL. Mix 30 bbl 2 ppb Biozan perf pill. 13:30 - 13:45 0.25 CEMT P RUNPRD PJSM w/SLB cementers and rig personnel concerning cementing operations, continue displacing well to 2% KCI at 2.5/2.45bpm wl i 030 psi. 13:45 - 15:30 1.75 CEMT P RUNPRD Batch mix 28 bbls 15.8ppg 'G' latex cmt with additives. Cmt to wt @ 14:20 hrs. Flush/PT lines to 4k. Pump 25.6 bbls cmt slurry @ 2.5/2.40 bpm w/ 1200 - 2300 psi. Close inner reel valve & clean lines. Load/launch CTWP with 500psi. Chase with 30bbls Biozan pill & 30 bbls KCL water @ 2.85 - 2.9/2.8 - 2.85 bpm w/ 2300 - 2000 psi. slowed rate 2.15 bpm w/ 1170 - 1350 psi, CTWP engage LWP @ 58.4 bbls away. Shear plug with 3500 psi. Continue displacing LWP @ 2 - 1.511.9 - 1.47 bpm w/ 1750 - 1530 psi, bump @ 69.2 bbls away with 1000psi over to 2600 psi. Bleed off & check floats -held. Pressure up to 500 psi, sting out of liner. 23.5bbls cmt pumped around shoe. CIP @ 15:25 hrs on 11107/05. 15:30 - 18:00 2.50 CEMT P RUNPRD POOH w/ baker RJT, Circ @ 1.6 bpm, Recovered in returns +/- 5 bbls of 10.1 ppg cement contaminated KCL water 18:00 - 18:30 0.50 CEMT P RUNPRD LD liner running tools. Clear floor. 18:30 - 19:30 1.00 CEMT P RUNPRD Pu nozzle and Jet stack 19:30 - 20:30 1.00 EVAL P LOWERI MU clean out /memory logging BHA. 20:30 - 22:00 1.50 EVAL P LOWERI PU 31 stands of 1-1/4" CSH work string. 22:00 - 23:30 1.50 EVAL P LOWERi RIH to 9700'. 500 psi compressive strenght achieved at 20:00 hrs. 23:30 - 00:00 0.50 EVAL P LOWERI Log down @ 30 Whr to PBTD. 11/8/2005 00:00 - 01:00 1.00 EVAL P LOWERI Log to bottom @ 30 tt/min. and tag at 12133'. 01:00 - 02:00 1.00 EVAL P LOWERI POH logging 60 Wmin. to 9700. Flag EOP 7700'. 02:00 - 03:10 1.17 EVAL P LOWERI POH to CSH. 03:10 - 05:30 2.33 EVAL P LOWERI Drop ball to open circ sub. Standback CSH. 05:30 - 06:30 1.00 EVAL P LOW ER1 LD logging tools & down load data. 06:30 - 07:30 1.00 CEMT P LOWERI MU swivel stick, flush out BOP stack and tree, RD 07:30 - 10:15 2.75 CASE P LOWERI RU Hot Oil, installed intergal flange w/ 1502 and lines to IA, test lines to 2000 psi, Pumped 40 bbls of diesel in IA, pressure up IA to 1000 psi, Attempt to P/T liner lap to 2000 psi, each time pressure dropped to 1500 psi in 15 minute, Checked Pumps, Surface lines, BOP stack, tree, flowline and wellhead, no leaks, IA increased f/ 1000 to 1077 psi. Pressure will remain on IA for next test (Liner top packer), RD Hot oil 10:15 - 11:45 1.50 PERFO P LOWERI Offload pert guns to pipeshed, RU to run perf guns 11:45 - 15:00 3.25 PERFO P LOWERI PU 64 guns 1364.49'. 1040' loaded. 15:00 - 16:00 1.00 PERFO P LOWERI PU 9 stands of 1-1/4" CSH. Check all intermediate connections. Pu injector. MU to BHA and stab onto well.. 16:00 - 18:00 2.00 PERFO P LOWERI R{H to 7700' EOP flag. Correction -2.5'. RIH Top of liner Up Wt 44.7K, Dn 23K,. RIH to corrected PBTD of 121 i 8. 18:00 - 19:00 1.00 PERFO P LOWERI PU to ball drop position. Pump 8 bbl pill. Drop ball and displace with 66.4 bbl (coil volume 60.7 bbl). Pressure up to 1500 psi. I Fire at 12075' at stand still. Printed: 11/11/2005 2:10:48 PM • BP EXPLORATION Page 8 of 8 Qperations Summary Report Legal Well Name: E-21 Common Well Name: E-21 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date j From - To !Hours ~I Task 'i Code I NPT j 11/8/2005 ~ 18:00 - 19:00 ~ 1.001 PERFOBI i - P 19:00 - 21:00 I 2.00 PERFOB P 21:00 - 21:45 0.75 PERFO~ P 21:45 - 22:00 0.25 PERFO P 22:00 - 22:15 0.25 PERFO P 22:15 - 00:00 1.75 PERFO P 11/9!2005 00:00 - 02:30 2.50 PERFO P 02:30 - 03:00 0.50 PERFO P 03:00 - 03:30 0.50 CASE P 03:30 - 05:30 2.00 CASE P 05:30 - 07:30 2.00 CASE P 07:30 - 10:15 2.75 CASE P 10:15 - 10:30 0.25 CASE P 10:30 - 12:20 1.83 CASE P 12:20 - 13:00 0.67 CASE P 13:00 - 16:30 3.50 CASE P 16:30 - 16:45 0.25 CASE P 16:45 - 17:30 0.75 CASE P 17:30 - 19:30 2.00 CASE P 19:30 - 22:00 2.50 CASE P 22:00 - 00:00 I 2.001 CASE I P Spud Date: 1 i/4/1981 Start: 10/28/2005 End: Rig Release: 11/9/2005 Rig Number: N1 Phase I Description of Operations LOWERI i 10K Ib overpull to move string up. All guns fired (confirmed while LD guns). Pits: 308 bbl. LOWERI POOH. Tight at 9750' (10K Ib overpull). LOWERI LD 9 stands of PH6. LOWERI RU SLB perforators for TOOH. LOWERI Safety meeting with SLB perforators for TOOH. Discussed trapped pressures, well control, sharp edges. LOWERI LD SLB pert guns. LOWERI LD perf guns. LOWERI RD SLB perforators. PROD1 PU Baker liner top packer BHA. PROD1 RIH with LTP BHA. PROD1 Circulate 5/8" ball to setting tool. Stab back in. PU to neutral wt +2'. Pressure to 2500 psi Set down 10K. Bleed off to 500 psi. Test packer to 2000 psi for 30 min. Held good NO pressure loss. Bleed off annular pressure. Pressure tubing 3450 psi to shear off liner packer. PROD1 POH to 2500. Freeze protect to surface. PROD1 PJSM for inhibiting coil. PROD1 Pump 10 bbl bleach, 50bb1 H2O, 18 bbl inhibited methanol. PROD1 N2 blow down. PROD1 Install grapple and pu11 back to reel house. Remove hard line. RU crane PROD1 PJSM for reel swap. PROD1 Swap reels. PROD1 Change out packoff and brass. PROD1 Change out annular preventers. ND BOPE. Rig released at 22:00 hrs 11/912005. PROD1 S!M for move off well. Move off E-21 B. S/M for move to F-pad. Move to F-Pad. Printed: 11/11/2005 2:10:48 PM Halliburton Sperry-Sun North Slope A/aska BPXA E-216 Job No. AKMW4018758, Surveyed: 6 November, 2005 Survey Report 21 November, 2005 Your Ref.• APl 500292057702 Surtace Coordinates: 5975423.00 N, 664100.00E (70° 20' 21.0435" N, 148° 40' 06.0338" VI/) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 65.12ft above Mean Sea Level U • ~ E ~'~ t ~ ~' =~' Survey Ref: svy4745 A HBllburton Company Halliburton Sperry-Sun Survey Report for E 21 B Your Ref.• API 500292057702 Job No. AKMW4018758, Surveyed: 6 November, 2005 Norfh Slope Alaska BPXA Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Az im. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 10393 .70 55 .130 177. 050 8730 .22 8795. 34 2902.95 S 3367. 59 W 5972447. 04 N 660796.75 E -4445.71 Tie On Point 10405 .00 55 .370 176. 560 8736 .66 8801. 78 2912.22 S 3367. 07 W 5972437. 78 N 660797.47E 4.148 -4451.27 Window Point 10432 .02 50 .710 166. 640 8752 .92 8818. 04 2933.54 S 3363. 98 W 5972416. 54 N 660801.03E 34.000 -4462.60 10462 .00 44 .340 153. 850 8773 .20 8838. 32 2954.30 S 3356. 66 W 5972395. 95 N 660808.80E 37.896 -4470.34 10490 .81 42 .170 139. 790 8794 .23 8859. 35 2970.76 S 3345. 95 W 5972379. 72 N 660819.87E 34.227 -4472.72 10519 .59 44 .230 126. 800 8815 .26 8880. 38 2984.18 S 3331. 65 W 5972366. 62 N 660834.46E 31.674 -4470.38 10551 .58 43 .000 109. 530 8838 .50 8903. 62 2994.55 S 3312. 36 W 5972356. 68 N 660853.97E 37.361 -4462.28 10580 .17 44 .490 95. 260 8859 .20 8924. 32 2998.74 S 3293. 15 W 5972352. 91 N 660873.27E 34.853 -4450.25 10609 .84 48 .720 82. 390 8879 .63 8944. 75 2998.21 S 3271. 69 W 5972353. 90 N 660894.71E 34.541 -4433.47 10638 .24 54 .450 72. 000 8897 .30 8962. 42 2993.22 S 3250. 07 W 5972359. 37 N 660916.21E 35.013 -4413.70 10667 .71 59 .740 61. 420 8913 .33 8978. 45 2983.40 S 3227. 43 W 5972369. 68 N 660938.63E 35.050 -4390.05 10700 .21 68 .900 52. 260 8927 .43 8992. 55 2967.34 S 3203. 02 W 5972386. 27 N 660962.68E 37.908 -4361.03 10729 .75 75 .510 42. 920 8936 .47 9001. 59 2948.37 S 3182. 32 W 5972405. 68 N 660982.96E 37.490 -4332.98 10764 .89 83 .700 34. 640 8942 .81 9007. 93 2921.46 S 3160. 74 W 5972433. 07 N 661003.95E 32.853 -4299.14 10799 .29 85 .640 32. 880 8946 .01 9011. 13 2892.98 S 3141. 71 W 5972461. 95 N 661022.36E 7.599 -4266.26 10829 .26 89 .960 30. 940 8947 .16 9012. 28 2867.57 S 3125. 88 W 5972487. 71 N 661037.62E 15.799 -4237.80 10859 .33 92 .600 30. 060 8946 .49 9011. 61 2841.67 S 3110. 63 W 5972513. 93 N 661052.31E 9.254 -4209.47 10889 .60 94 .540 29. 000 8944 .60 9009. 72 2815.38 S 3095. 74 W 5972540. 54 N 661066.62E 7.300 -4181.17 10918 .71 92 .690 24. 950 8942 .77 9007. 89 2789.50 S 3082. 56 W 5972566. 71 N 66107922E 15.270 -4154.44 10951 .55 90 .930 24. 070 8941 .73 9006. 85 2759.63 S 3068. 95 W 5972596. 86 N 661092.18E 5.991 -4124.81 10982 .81 88 .630 23. 190 8941 .85 9006. 97 2731.00 S 3056. 42 W 5972625. 77 N 661104.08E 7.878 -4096.80 11014 .16 86 .780 23. 710 8943 .10 9008. 22 2702.26 S 3043. 95 W 5972654, 77 N 661115.92E 6.129 -4068.78 11051 .78 90 .130 26. 180 8944 .12 9009. 24 2668.17 S 3028. 10 W 5972689. 20 N 661131.02E 11.062 -4034.72 11083 .70 91 .280 31. 640 8943 .73 9008. 85 2640.24 S 3012. 67 W 5972717. 46 N 661145.83E 17.479 -4004.96 11116 .62 87 .580 35. 170 8944 .05 9009. 17 2612.77 S 2994. 56 W 5972745. 32 N 661163.34E 15.532 -3973.42 11152 .31 86 .170 37. 280 8946 .00 9011. 12 2584.02 S 2973. 50 W 5972774. 52 N 661183.77E 7.103 -3938.81 11184 .32 87 .930 42. 220 8947 .65 9012. 77 2559.46 S 2953. 06 W 5972799. 53 N 661203.66E 16.363 -3907.36 11214 .30 86 .780 45. 920 8949 .03 9014. 15 2537.94 S 2932. 24 W 5972821. 49 N 661224.01E 12.911 -3877.58 11253 .98 86 .080 51. 200 8951 .50 9016. 62 2511.74 S 2902. 56 W 5972848. 34 N 661253.11E 13.397 -3838.01 11284 .64 89 .690 51. 910 8952 .63 9017. 75 2492.69 S 2878. 57 W 5972867. 90 N 661276.68E 11.999 -3807.38 11321 .05 87 .310 52 .610 8953 .59 9018 .71 2470.42 S 2849. 79 W 5972890. 81 N 661304.96E 6.813 -3771.02 11351 .35 88 .190 52. 260 8954 .78 9019. 90 2451.96 S 2825. 79 W 5972909. 78 N 661328.55E 3.125 -3740.77 11385 .08 91 .450 51. 560 8954 .88 9020. 00 2431.15 S 2799. 24 W 5972931. 17 N 661354.63E 9.885 -3707.06 11419 .31 95 .510 54. 200 8952 .81 9017. 93 2410.54 S 2772. 01 W 5972952. 37 N 661381.41E 14.139 -3672.95 11448 .45 95 .770 55. 780 8949 .94 9015. 06 2393.90 S 2748. 26 W 5972969. 52 N 661404.79E 5.469 -3644.06 • 21 November, 2005 - 13:34 Page 2 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for E-21B Your Ref: API 500292057702 Job No. AKMW4018758, Surveyed: 6 November, 2005 North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 11480.43 95.150 63.540 8946.89 9012.01 2377.84 S 2720.81 W 5972986.19 N 661431.89E 24.232 -3612.70 11512.88 94.710 70.060 8944.10 9009.22 2365.11 S 2691.11 W 5972999.56 N 661461.30E 20.064 -3581.77 11545.41 92.950 78.870 8941.93 9007.05 2356.43 S 2659.87 W 5973008.93 N 661492.34E 27.557 -3552.26 11578.69 95.950 86.800 8939.34 9004.46 2352.29 S 2626.98 W 5973013.78 N 661525.13E 25.406 -3524.40 11610.71 93.130 93.490 8936.80 9001.92 2352.37 S 2595.08 W 5973014.40 N 661557.03E 22.611 -3500.02 11639.94 87.220 90.320 8936.71 9001.83 2353.34 S 2565.88 W 5973014.07 N 661586.24E 22.942 -3478.28 11669.22 86.520 86.450 8938.31 9003.43 2352.52 S 2536.66 W 5973015.53 N 661615.43E 13.412 -3455.37 11699.52 89.780 82.390 8939.29 9004.41 2349.57 S 2506.53 W 5973019.13 N 661645.49E 17.177 -3430.39 11735.34 89.960 76.220 8939.37 9004.49 2342.93 S 2471.35 W 5973026.55 N 661680.52E 17.232 -3399.17 11763.29 91.010 70.060 8939.14 9004.26 2334.83 S 2444.62 W 5973035.23 N 661707.07E 22.356 -3373.48 11793.97 90.220 65.480 8938.81 9003.93 2323.22 S 2416.23 W 5973047.45 N 661735.20E 15.148 -3344.28 11828.48 87.490 61.600 8939.50 9004.62 2307.85 S 2385.35 W 5973063.49 N 661765.73E 13.745 -3310.74 11866.70 90.130 57.550 8940.29 9005.41 2288.51 S 2352.41 W 5973083.56 N 661798.24E 12.646 -3273.07 11897.96 88.280 63.890 8940.72 9005.84 2273.23 S 2325.16 W 5973099.43 N 661825.15E 21.125 -3242.38 11926.50 89.250 69.180 8941.34 9006.46 2261.87 S 2298.99 W 5973111.35 N 661851.06E 18.840 -3215.04 11961.19 85.110 73.050 8943.05 9008.17 2250.66 S 2266.23 W 5973123.28 N 661883.57E 16.326 -3182.73 11993.26 89.520 81.690 8944.55 9009.67 2243.67 S 2235.00 W 5973130.95 N 661914.64E 30.215 -3154.31 12021.04 92.860 86.270 8943.97 9009.09 2240.76 S 2207.39 W 5973134.47 N 661942.18E 20.400 -3131.29 12052.46 92.690 92.440 8942.45 9007.57 2240.40 S 2176.03 W 5973135.51 N 661973.53E 19.622 -3107.04 12085.59 87.140 92.440 8942.50 9007.62 2241.81 S 2142.94 W 5973134.82 N 662006.64E 16.752 -3082.60 BPXA Comment ~J 12117.66 83.170 88.560 8945.21 9010.33 2242.10 S 2111.00 W 5973135.24 N 662038.58E 17.278 -3058.31 12136.31 82.380 85.920 8947.56 9012.68 2241.21 S 2092.52 W 5973136.54 N 662057.03E 14.668 -3043.58 12159.00 82.380 85.920 8950.56 9015.68 2239.60 S 2070.09 W 5973138.63 N 662079.42E 0.000 -3025.37 Projected Survey • All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference . Northings and Eastings are relative to Well Reference . Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well Reference and calculated along an Azimuth of 50.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12159.OOft., The Bottom Hole Displacement is 3049.77ft., in the Direction of 222.747° (True). 21 November, 2005 - 13:34 Page 3 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for E-218 Your Ref: API 500292057702 Job No. AKMW4018758, Surveyed: 6 November, 2005 North Slope Alaska BPXA Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 10393.70 8795.34 2902.95 S 3367.59 W Tie On Point 10405.00 8801.78 2912.22 S 3367.07 W Window Point 12159.00 9015.68 2239.60 S 2070.09 W • Projected Survey Survey tool program for E-21 B From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 0.00 9905.94 8438.47 BP Conventional Gyro -BOSS-GYRO (E-21) 9905.94 8438.47 12159.00 9015.68 MWD Magnetic (E-21A) • 21 November, 2005 - 13:34 Page 4 of 4 DrillQuest 3.03.06.008 TREE = 4-1 /2" SM CM! WELLMtAD = _- ACTUATOR= FMC BAKER KB ELEV.= 65.1' BF. ELEV = 32.08' KOP = 3006' -Max Angle = 96 @ 11448' Datum MD = 10499 Datum TV D = 8800' SS ~TOPOF 7" TIEBACK LNR 13-3/8" CSG, 72#, L-80, ID = 12.347" NOTES: 3-1 /2" X NIPPLE IS NOT E ~~ ~ ~ ACCESSIBLE DUE TO 2.355" SEAL ASSY ID 2219' 4-112" SSSV LANDING NIP, ID = 3.813" 2419' 2691' GAS LIFT MANDRELS Minimum ID = 2.355" @ 10273' 3-1/2" LNR TOP PKR w/SEAL ASSY TOP OF 7" LNR 9370' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~-j 9798' 9-5/8" C5G, 47#, L-80, ID = 8.681" ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 4435 7837 4200 6748 38 46 CAM CAM DMY DMY INT INT 0 0 12!09103 12!09!03 NOTE LATCHES ON GLY#1 & Z ARE STRIPPED 9( 731' ~-- ~ 4-1(2" HES X N{P, 4D = 3.813" 9741' 7" X 4-112" BKR S-3 PKR, ID = 3.875" 9764' 4-1/2" HES X NIP, ID = 3.813" 8785' 4-1/2" HES XN NIP, MILLED (10129/05) ID = 3.80" 9798' 4-112 WLEG 97$9' ELMD Tf LOGGED 01f13/98 9794' 7" X 4-1/2" BKR ZXP PKR, ID = 4.438" 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" ~ 10675' 10273` 3-1/2" LNR TOP PKR w /SEAL ASSY, ID = 2.355" 10279' .3.70" BKR DEPLOY SLV, ID = 3.00" MILLOt1T E-21A WINDOW 9945' - 9951' 10300' TOP OF CEMENT 10321` 3-112" HES X NIP, ID = 2.813" 3-1f2" LNR, 8.81#, L-80 STL, .0080 bpf, ID = 2.992" 10353' 10353' 3-1t2" X 3-3/16" XO, ID = 2.867" WHIPSTOCK 10400' MILLOtfT E-21B WINDOW RA TAG 10409' 10400' - 10407` 4-112" BKR GIBP (10/28/05) 10450' ELM 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" 13487' 10606` 3-3/16" X 2-7/8" XO, ID = 2,441" PERFORATION SUMMARY REF LOG: SWS MEM CNL ON 11!07!05 ANGLE AT TOP PERF: 76 @ 10720' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10720 - 11090 O 11 /08!05 2" 6 11140 - 11240 O 11/08(05 2" 6 11370 - 11440 O 11/08f05 2" 6 11510 - 11800 O 11 /08!05 2" 6 11830 - 11910 O 11/08(05 2" 6 11940 - 12070 O 11108(05 3-3/16" LNR, 6.2#, L-80 TCII, l 10606' .0076 bpf, ID = 2.80" PBTD --t 2-7/8" LNR, 6.16#, L-80 STL, .0058 bpf, ID = 2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS ? ORIGINAL COMPLETION 12!22/97 JLM SIDETRACKCOMPLETION 11!09/05 Nordic! CTD SIDETRACK 11f15f05 RAC/TLH DRLG DRAFT CORRECTIONS 12118' 12154' PRUDHOE BAY UNIT WELL: E-218 PERMIT Na: X2051470 API No: 50-029-20577-02 SEC 6, T11N, R14E, 1633' FNL & 883' WEL BP Exploration (Alaska) • 06-Dec-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well E-21 B Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 10,393.70' MD Window /Kickoff Survey: 10,405.00' MD (if applicable) Projected Survey: 12,159.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage AK 99518 Date Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) \ ~ ~ 1 V~ ~ mot"~ ~~ ~ ~ f~ f j ~ ~ jam' ! 1 ; ~ , ~"7a i~ J'~ ~ 's ~ ~ ~ ~ ~ ~ ' ~ ' ~ ~ '~ ~ °~ ° , ~ ~ ~ FRANK H. MURKOWSKI, GOVERNOR Ai.ASBiA OII. A1QD GA5 333 W. 7TM AVENUE, SUITE 100 CON5ER~A'1`IO1~T COriDII55IO1~T ~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Barbara Holt CT Drilling Engineer BP Exploration (Alaska} Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay E-21B BP Exploration (Alaska) Inc. Permit No: 205-147 Surface Location: 1633' FNL, $83' FEL, SEC. 06, T 11 N, R 14E, UM Bottomhole Location: 3749' FNL, 3015' FEL, SEC. 06, T 11 N, R 14 E, UM Dear Ms. Holt: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Cade, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty- four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659- 3607 (pager). DATED this f~ day of October, 2005 cc: Department of Fish & Game. Habitat Section w!o encl. STATE OF ALASKA ALASK,~"OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 li.l ~ /~.... i U:11 ~ ~ Lzr; y ... ~~~~~~~ OCT U ~ 2005 i Alaska pii & Gas Cans. C©mmission 1a. Type of work ~ Drill ®Redrill ^ Re-Entry 1b. Current Well Class ^ Exploratory ®Development Oil one ^ Stratigraphic Test ^ Service ^Development Gas ^ Single Zone 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU E-21 B ~l of 7 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12130 TVD 8950ss 12. Field /Pool(s): Prudhoe Bay Field !Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 1633' FNL 883' FEL T11 N SEC 06 R14E UM 7. Property Designation: ADL 028304 Pool , , . , , , Top of Productive Horizon: 387' FNL, 3830' FEL, SEC. 07, T11N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Octob 20„2405 Total Depth: 3749' FNL, 3015' FEL, SEC. 06, T11N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 9,600' 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664100 y- 5975423 Zone- ASP4 10. KB Elevation (Height above GL): 65.12' feet 15. Distance to Nearest Well within Pool 700' 16. Deviated Wells: Kickoff Depth: 10400 feet Maximum Hole Angle: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3205 Surface: 2325 / 1 asing rogram: Size Spermcations Setting Depth To Bottom uantity o ement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta data 3-3l4" x 4-1 /4" s-a/,s" x 2-~/s" 6.2# ! 6.16# L-80 STL 1830' 10300' 8740' 12130' 8950' 129 cu ft Class 'G' 19. PRESENT-WELL CONDITION SUMMARY (To`be completed for Redrill AND Re-entry Operations) Total Depth MD (ft): 13487 Total Depth TVD (ft): 9037 Plugs (measured): None Effective Depth MD (ft): 13401 Effective Depth TVD (ft): 9022 Junk (measured): None Casing Len th Size Cement Volume MD TVD C n ct r 110' 20" x 30" 8 cu ds Concrete 110' 110' 2691' 13-3/8" 3720 cu ft Arcticset Il 2691' 2691' nt ' t 9875' 9-518" 1351 cu ft Class 'G', 130 cu ft Arcticset 1 9875' 8412' Pr u i n i 7526' 7" 14 cu ft Class 'G' 2419' - 9945' 2419' - 8472' Liner 3693` 4-1/2" 520 cu ft Class 'G' 9794' - 13487' 8342' - 9037' Perforation Depth MD {ft): 11850' - 13350' Perforation Depth TVD (ft): 8968' - 9014' 20. Attachments. ®Filing Fee, $100 ®BOP Sketch ®Drilling Program ~ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Barbara Holt, 564-5126 Printed Name Barbara Holt Title C7 Drilling Engineer Prepared By Name/Number: Si nature Phone 564-5126 Date ~6 !~S- Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number: 2 ~.s- API Number: 50- 029-20577-02-00 Permit Approval __ Date: ~'~ /~ c- /c ~ See cover letter for other requirements Conditions of Approval: Sample a uired ^ Yes ~'No Mud Log Required ^ Yes ~No Hyd gen S Ifide Measures ,~'es ^ No Directional Survey Required Yes ^ No Other: ~~' ~`" ~ `~ t% C; ~ ~~ I APPROVED BY A rov B THE COMMISSION Date ~8 l~ D Form 10-db'~Revis4 ~ ~ ~ ~ { --t ~ ~~f /', ~ Sy~mit In~?uplicate • • by To: Winton Aubert, Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Barbara M. Holt, CTD Engineer Date: September 29, 2005 Re: E-21 B CTD Sidetrack Permit to Drill The sidetrack, E-21 B, is scheduled to be drilled by Nordic 1 during the last week of October. The plan calls for running a CIBP above the existing perforations prior to setting a whipstock for anexit into Zone 2. E-12B will target Zone 1 A production. CTD Sidetrack Summary Rig Work: 1. MIRU Nordic 1 and test BOPE to 250 psi low and 3500 psi high. % 2. Mill 3.725' XN nipple at 9785' MD to 3.8". 3. Mi113.80" window at 10,400' MD (8800' ss) in Zone 2. 4. Drill approximately 1730' of horizontal sidetrack into Zone lA target with Resistivity logging to 12,130' MD. Bit selection size from 4.25" to 3.75". 5. Run 3-3/16" x 2-7/ '%,lid liner, TOL at 10,300' MD (8740'ss). ~' 6. Cement liner wi 23 is 15.8 ppg cement to place top of cement at TOL. 7. Cleanout liner an st to 2000 psi. 8. Log memory CNLIGR/CCL from the tubing tail to PBTD. 9. Perforate liner as per Asset instructions, approximately 1000' of perforations expected. 10. Freeze protect well and RDMO. Mud Program: • Well kill: 8.5 pp ruse • Milling/drilling:6 fpg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Casing Program: • 3 3/16" x 2 7/8" fully cemented liner • A minimum of 23 bbls 15.8 ppg cement will be used for liner cementing. Casin finer Infor~Cation • OD Grade Wei t Burst Colla se 9-518" L-80 47# 6870 si 4760 si 7" L-80 26# 7240 si 5410 si 4-112" L-80 12.6# 8440 si 7500 si 3-3/16" L-80 6.2# 8520 si 7660 si 2-7/8" L-80 6.17# 10,570 si 11,160 si 4-1/4" - 3-314' en hole Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack offwill be pressure tested to 250 psi and to 3500 psi. r • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 9,600 ft. • Distance to nearest well within pool - 700 ft. Logging • MWD directional and Gamma Ray/Resistivity will be run over all of the open hole section. • Log memory CNL/GR/CCL from the tubing tail to PBTD. Hazards • The maximum recorded H2S level on E Pad i 10 pm (E-37A on 4/15/2005). Most wells are below 10 ppm. • Lost circulation risk is average. Reservoir Pressure • Res. press. is estimated to be 3205 psi at 8800'ss (7.0 ppg EMW). • Maximum surface pressure with gas (0.10 psi/ft) to surface is 2325 psi. TREE = 4-1 /~" SM C:MI WELLHEAD= FMC ACTUATOR= BAKER KB. ELEV = 65.1' BF. ELEV = 32.08' KOP = 3006' Max Angle = 94 ~ 12302' Datum MD = 10528' Datum TV D = 8800' SS ~TOPOF7" TIEBACK LNR 13-3/8" CSG, 72#, L-80, ID = 12.347" TOP OF 7' LNR TOP OF 4-1 /2' LNf .0152 bpf, ID = 3.958" E ~2 ~ B SAFELY NOTES: HORIZONTAL W ELL. 70° Proposed CTD Sidetrack ~ 1os17' AN~so° @ 1os7o' 2219' 4-1/2" SSSV LANDWG NIP, ID= 3.813" I 9798' I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 4435 7837 4200 6748 38 46 CAM CAM DGLV DGLV INT INT 12/09/03 12/09/03 9785' ~4-1/2" HES X NIP, ID = 3.813" 7" X 4-1/2" BKR S-3 PKR, ID = 3.875' 9789' ELMD TT LOGGED 01/13!98 9-5/8' CSG, 47#, L-80, ID = 8.681" 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" OF 3-3/16" LN 10300' XN Nip 2.75" ID 10310' PERFORATION SUMMARY REF LOG: SPERRY SUN MWD ON 12/17/97 A NGLE AT TOP PERF: 90 @ 11850' Note: Refer to Production DB for historical pert data SQE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 11850 - 12170 Isclatec oroposed 2-7/8" 4 12200 - 12260 isolates proposed 2-3/4" 4 12750 - 13100 isolated proposed 2-3/4" 4 13150 - 13350 isolated proposed rttlu 73407" 4-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" 13487' MLLOUT WWDOW 9945' -9951' 10290' Liner Top Packer x 11800' 41/2" X 2-7/8" BKR FAB-1 STRADDLE PKR, MID ID = 2.375" ~ 12315' 1232T wL~~ DATE REV BY COMMENTS DATE REV BY COMMENTS ? ORIGINAL COMPLETION 07/11/03 CMO/TLP KB ELEVATION CORRECTION 12/22197 JLM SIDETRACKCOMPLETION 12/09/03 RMH/TLP GLV GO 01/10/02 RN/TP CORRECTIONS 02/04/04 CMO/TLP PERF SUMMARY CORRECTIO 01 /21 /02 JA Fttlh ADD PERFS 02/26/03 CMO/KK MAX ANGLE CORRECTION 02/28/03 KSB/KK SET STRADDLE PKR PRUDHOE BAY UNR WELL: E-21A PERMIT No: 1971980 API No: 50-029-20577-01 SEC 6, T11N, R14E, 1633' FNL & 883' WEL BP 6tploration (Alaska) • ~,, Baker Hughes L~T~"Et, Baker Hughes L'~rI'EQ Flaaniag Report ~~TE~ Compeer. BP Amoco Data: 4l?4i~ ?5as: 08:35.28 Page: 1 Fem." : P~nr BaY ~ diate(i~) Rr. 1Nwr5: E-21. Tnx AparMi (TtTD}Ralaraacr. E-2fA~.1 R'eH: E-21 Secfioa (1'1~ Aa~eteace: Wetl 40ADM,O.IiDE.56.Ot>,Azi~ R~dbstk: Pim~3. E-216 s..~[:dr~'ac -~ ~ eali,~r.~ r Ku~e..a r1M nti..a. Field: Prudhoe Bay Mardr srope UMiTEO STATES 'dap Sgsbm:U5 State Plane Coordinate System 1927 biap T.ose: A3sski. Zane 4 GtoDatam: MA027 (CCarhe 1888y GoordiasM System: yY~ Cer-tre Sgs Datom: Mean Sea Levd Geom 7~Sedd: bOp~m2~5 Side: 7'8 E Pad 732-11-14 UMfTED STATES :North Sbpe SalaPesiieoa: Neellriet~: 5073f80.88 R Latitada: 7D 10 50.134 N From: Map Eestia8: 882538.:97 ft Lastitade: 148. 4D 53.054 W PesitioslFacsrtaiatp: O.DD ft Wor~3it~ef+aaacr True Greaad Lard: O.OD ft Grid GoarxTwcr: 1.24 dp R°'dl: E;-21 Slot Nsae: 21 E-21 R'all Positioa: +~'-S 2228.35 11 Nortleia;8: 5875423..43 ft LatifaM: 7D 26 21.048 M +g-R 7808.$7 it Esstiei: Od4DD8.D7 t! : 148 40 8:081 Y71 Positiaa Uacartaiaty: O.DO ft A~sltpsri: P1an3, E-218 DNW From: 1E-21A Tiesa< Dpi: 10993.70 1't C' arte~t Detam: E-21A Hart 45.12 h AMaie Svshst Dstam: lAem Sea i!aw®t. ]fagaatic Data: 91282005 FieM Streagtie: 57804 aT Declwtisc Ma8 D~ AtSla: 24.76 dp 86.81 dp S'ertKSl Section: Dapt6 From ~'D) +2\ ^-S +E+'-R' Directiea R ft ft dp 35..12 D.OD D.00 50'.OD Plea: Plan t-9 Dote Coaeposod: 9r<28l2005 use Feeder surveys and RKB. simliar to Plan 2' ~'ersiea: 3 Prfficgsl: 'Y'es Tied-to: From: 7:iefinitive Path Tsr~ets Vasa Dim D3+r. 1t~ ~~ R `F 8~ Nor85yfn8 lE fttiaZ Dq ATn Src D+R ~ Sac E-218 Pc-typon 135.12 -2772.48 -328Q.7t3 5~872580.OD a8688D.~ 76 99 53.774 M i48 ~1 41.852 'W' PaEy$on 1 05.12 -2772.4$ -328~D.7E 557258D.DD 03D88D.00' 7D 90 53.774 M 148 +11 4T.85Z #Al -f'~atygon 2 !85.12 -22'83.74 -2751iAD 5973~D.DD adt310D~ 70 99 58.583 M 148 +Ef 20.E W PO[ygon 3 ~65.t2. -2~D&2.45 -2134.53 5$7328S.DD OA2D15.~ 7D 2D D.48tf M 148 41 8.273 W -Palygon4 85..12 -2225.2? -2pD3.3Si 5G73f55.f~ 8821~5.DD 7D 1~ 5,4.15D M 1413 41 4.580 W Pofy9on 5, t36.1Z -2S97.D8 -2811.71 597277D.DD 881545.00 7i1 A9 S:S.bD1 M 148 ~41 22.315 11Y -Pplygord 4 85.12 -3D0$.85 -3?3D.!Bi 5872345.t~ 58DG35.00 7D 1p ff1.451 M 14$ 41 4D.344 1N E-218 Fait3t f 85..13 -3302.88 -3737.3D 597204D.DD 880435.00 70 19 48.557 M '1+'38 41 53.18D 7N 1"'aty$ora 1 85.12 -33D2.~ -3737.56 567204p~~ 890433_DCf 7D 1S 48.557 M i4$ 41 5S:18D W ,f3olypan 2 85.12 -8113.08 -3218.21 467224D_00 88095D.DEF 7D 19 50.414 M 148. 47 40,022 1NP -PotyOan 3 $5.1.2 -2886.88 -2407.84 50725dS0.DD 881885_ 76 19 52.821 M f48 4i 18.6188 31y PolYOmn 4 85..12 -3173.08 -3218.27 507224D_DD 88DR'iDQi!' 7D 10 5Q-418 M 148 41 4D.D22 YV E-218 Pau612 85.f2 -2578A7 -2818.27 5672760.DD 8t31540~ 70 76 55.88fl! M 148 47 22,452 3N -PaFy~rk 1 85.12 -2578.07 -2818.27 5G7276D_DD 88154D.D0 7D 16 55.tf0a3 M 148 ~41 22.452 yYtd Pc3ygon 2 85.12 -283D.35 -24ES2.30 5~07274D_ila 8tF1805.~ 7D 10 55.175 M f48 41 17,058 W E-218 Faul7 3 85.12 -23!)5.74 -3125.56 5973050.00 881025.E 70 19 58.345 M 148 47 97.324 Y61 $~y9an 1 85..12 -2305.74 -3125.50 5073050.00 481023.00 7D 19 5$.983 M 148 47 37..324 7M Poyipn 2 85.12 -2008.88 -2543.81 5973346.00 0814000 70 26 1.297 M 148 41 20.3+12 1N PaajwOcn 3 85..12 -2D34.54 -2D34.DD 5073355_DD 88211D_00 7D 20 1.13+k M f48 41 5.455 W -PalY6on 4 85.12 -2008.38 -2543.81 557338D.DD ~18D0.00 70 20 1.291 M 148 4f 20.3421u7W E-2'186=autt4 85.12 -21f0.02 -1983.87 597327D.00 082100.00 70 ZO D.288M 14$ 47 4,0491N -Pa~Oon 1 85.12 -211D.82 -1085.87 567327D.DD 582180.00 70 2D D.288 M 1+18 41 4.0!40 W ~o1y~n 2 85.12 -2'388.02 -1701.83 50730DD,.DD 08245D-'D0 70 16 57571 M 1+T.$ ~40 55.753 W r~ U ~, Baker Hg~hes INTEQ~ Luker Hughes I~tTTEQ Plaaniag Reparlt iL~r~.c~ Lee~ppaar 131' Amara Da4e: 9129~a Time: 0815:28 Fa;e: Field: Pn~dhoe Bay C+~sreHlb;} $easreace: WNI: E 31. True rJa1h Site: P$ E Pad Ya#ical~3l~7!}>ca~: E-3iA$S_i R'eH: E-2t Secti~a ~-'r}s ti~acs: We11(O.DON.O.4~.50.DOAx) A~ eBpat6: Plana, E-218 &arest Cper1 Adalhs+i: Mrnimc+m Ctxvat+n+e D1e: Qracle Targets 3dap Msg a--- I.atitede -..-~ t- I~ed+ ~~ *dame II~exripHea Tt~ ~I~F-S +E!-~G I~iortita6 EsstSei Deny I1d~ Sec Deb ]4tI~ Sec Dfp. Dfir. ft ft 0 R R E-21'8 Tarpel i 9016.12 -2852.88 -3112.48 5972602.DD 06009D.DD 70 19 52.983 N 148 41 38..860 W E-2'1'8 Target 2 9015..12 -2192.71 -2i 18.60 fr6J32~i.00 062027.00 70 2p 0.207 Nei 148 41 ?.fl~5 YM .1a>~tstiea 3iD TVD fi t! 1G1368.70 8x69.34 T1P 90400~D0 8798.93 K4P 10420.00 8810.59 End of 9'1100' Dk5 1D470.00 8840.28 4 90fy2D.00 8888.34 5 10584..04 8931..70 0 107BD.02 6015.48 End of 4D°1'100' OLS 11240.42 6015.48 8 71560..02 6015.48 9 1'1860.02 8019.48 10 12134.00 0.013 T[1 P'laa Sectionla4onaatiea AID Iacl Asia T!'A +~-$ +E.'.g6 D1LS 1iwTa Tors TF4 Target i3 dap deft 1t R R dey'100R dr6li00R degTlptM dap 90383.7D 55.73 177..05 87fl5.34 -2802..67 -33E7.57 O:DO D.00 0.00 O.OD 1040D.40 55,.26 170.77 87fl8.93 -2808..14 -330'..26 4.16 2.08 -4.44 296.41 90424.OD 53.40 170.77 8810.5fl -2624.37 -33E0.38 6.00 -6.DD O.OD 180.00 10470.OD 35..14 105.05 8840.28 -2p58.07 -3301.48 40.:00 -36.03 -23..45 200..00 10520.00 39,.76 132,.3'4 8880:34 -2983:Ofl -3345.86 40.00 6.29 -04.01 270.00 7058D.00 45.42. 67..62 8931.1D -26'69.60 -3310.03 4D:DD 8.38 -58.04 270..00 90780.02 '60..00 22,02 Df119.48 -260D.25 -31BD.21 40.im 22.29... -37.65 280.00 11240..02 90.00 77.22 6015.48 -2013:OD -2843.21 12.00 D.OD 12,00 60.00 11584.42 60.:00 35.22 DDf9.48 -2423..31 -2558.76 12.E 0.00 -12.00 270.00 1'1860.02 6000 71.22 9015.48 -2240:00 -2322.48 12.E 0.00 12.00 6i0.D0 12134.D0 60:00 42:42 6Di5.48 -2110.04 -2123.31 12:~ O.OD -12.011 270..00 Sara-e!~ 3iD 7acl .~rita SS'i1'I! ~5 F.~4 atap~i 2lisPE DIS ~S TFO Toot tt deg dep R 12 h it >! dep/104R R deg 7G3a3.T0 55,.13 177.05 8730.2'2 -2602.67 -3367.97 5972447..05 60071.07 O.OD X44+45.70 0.00 MWD 10400.00 55,.20. 170.77 8733:81 -2608.14 -3307.29 5972442.50 600790.43 4.16 X4443.81 266.41 M+A'D 10420.00 53..#0 1'70.77 8745.47 -2624.37 -3300:38 5672420.26 000767.73 9.00 -4+b59.54 18D.E30 M1IgD 10425,00 51.58 "t75pd9 8748.01 -2II28.33 -3308.12- 5672422.:34 00117U~.03 40.00 -440D_89 2D~O.DO MU4l) 10450.OD 42:3:2'. 170.71 8705.50 -2610.45 -3304.00 5972404.27 0008A0.53 40.00 -4f70.90 200.53 M1lYfD 1047D.@0 35.14 1:05.05 $78i_td -2658.07 -3301.48 5972382.11 OOF1~3.37 40.00 X4470.84 204.08! MWD 1D475.00 35.19 161.97 $785.24 -2661.43 -3300.05 5672389.37 i900~3.20 411.00 -+1477.68 270.00 MWD 1050D.00 30.86 144.78 8805.51 -2974..43 -3354.03 5672376.52 000811.10 4D.00 -4481.20 272.84 MWD 1052D.00 36.:79 132.74 8821.22 -2983.06 -3345:80 Sfl?2307.44 6008'16.54 40.00 -4480'.65 280.45 MWD 10925.00 36.83 129:02. 8825.00 -2985.80 -3343.45 59725.38 68D821.99 40.OD -4480.40 27D.00 M'WD 10550.D0 41,.27 194:37 8844.10 -2964.33 -3326.74 56723'57.10 000835.86 40.DOi -4475.44 272.40 MWD °10575.00 44..57 100.48 8882.45 -2666.34 -3313.56 5672352.50 000862..17 40.00 14$0.27 284.02 MWD 10580.00 45.42'. 67:62. 8805.68 -2666.60 -3310A7 5672362.02 000855'1.07 40.00 -4403.60 294.22 MWD i0600.OD 47.32 87.17 8876:813 -3000.52 -3265.05 5672351.77 60087D.10 40.00 -4453..31 280.00 MWD 1~25.D0 51:@0 74:80 8890.16 .2667.52 -3277.05 5972365.12 600888.03 40.OD -443?:1'.3 287.43 MWD 150.00 55..82 03.94 8611.11 -2990.42 -9258.33 5672302.02 000607.18 40.00 -4418.23 265.5D MWD 100.75.00 $9,.51 54.3D 8624.13 -2676.44 -3240:07 5672374.00 600925.210 40.00 -4397.1`6 302.@3 MIIWD 10700.00 07.80 45.06 8Q34.84 -2964.91 -3222:83 5672388.91 000942.12 40.00 -43?4.83 307.40 MWD 14725.00 74.51 37:84 8642:62 -2647.26 -32E17.12 5972400..89 OOD9157.44 4D.00 -X435120 310.76 M'NWD • ~ ;~ ~ ' Baker Hughes INTEQ Baker Hughes T~1TEQ Planning Report !~ u~r~~i Caaspsm: Bf' Amrxxi Dsle: 0/2(~124D5 Tie: f~9:~35:28 ?a8e: 3 Field: Prudhoe ety Cd r: Welk E~21, True 7~ Sits: PB E Pad t+stirsl(Tt'A)lie&iarace: E-2fR85.f 7aMd1: E-21 8sc8an~>~tisarce: WRN(d'i.DO~l.t3.ODE.50.00Axi) FGeppatk: Plx-3. E-216 9+grep CMcUa~a l13e4odt l~imurt+ Gxvamurr ~: Orade Surr•rs 'Jiff Iad AavD 552'VD l~S 1ElW' 31[apPC ~ 1DLS 1°S TFO Teel 8 deg deg h 0 ft R # deyl10fl8 R dep 1®750:d0 8'1..4? 3p.50 898.73 -202T.p5 -3193.42 5072127.44 66p0T4.E0 40.Dp -4327.77 313.29 MWD 10775.04 88,67 23.4'? 8950.341 -29p4.88 -3982.15 507214'0.81 860081..48 4p.o0 -~43p4.88 314.83' M'WD 10780..42 0p:0D 22.42 8950.36 -2900.25 -3180.21 5972464.48 840983.31 40.pp -4F3pD,42' 3'R5.44 NIWD 7480p:D4 0p:00 24.41 8050:33 -2887.88 -3172:33 5972473.01 380994.78 72.p4 -4282.69 90.00 MWD 70825.44 00:DD 27.41 805p.33 -286$.40 -3731.47 5972#06.72 86104t.2f 72.44 -425$-77 90.4p fi9NVVD 1p850:04 011:00 3p.47 8050.33 -2837.!12 -3110.32 5972517.83 1581012.81 12.00 -423~.+kt 9tf.Q0 MVIID 74875.:04 00.:40 33.41 8950.33 -2813.30 -3938.11 5072530.37 831025.:53 S2.D0 -#212:38 Od.Op IWWD tD900_DO' 00.:00 33.41 8950:33 -2795.80 -3724:80 °5072544.97 861030.47 12.p0 -4i8$.6'~ 9p.00 MD 1D925:DD Op,:OD 39.41 8050.30 -2776.08 -3106.44 5972580.22 OOip54.34 72.00 -~L4.34.t0 Q~.00 MWD f0950!:DD 90.OD 42.49 895~1.3d -2767.19 -3090:DT 59709.43 037074.29 t?.00 -413i9A2 9Q.00 BAWD (0975.:00 04..00 45.41 8950.30 -2739.18 -3072.73 5072317.85 861087.23 12.£H} -4114.58 QD.QL# M1MD 1 td40,:Od 94:D4 48_+11 8$50:38 -2722.17 -3054.48 5072836.32 041705.. 7 i 12.p0 -4o89.3D' x.00 M1ND 77025.:44 94.00 57.41 80'50:30 -2704.01 -3035' :35 5972661.83 881123.87 12.D0 -4p94:3f 04.00 MWl:9 71450.:00 9p:d0 54.47 805D_30 -2300.94 -X95.41 5972337.33 841143.48 72.Dti ~F439.:84 90.D0 :MWD 79075.4L1 Dp:00 5T_41 8950:30 •2376.93 -2994.71 5072881.79 881183..87 12.00 -4p14.78 fl0.Q0 #IfWD 717'p0:@p 9p:00 60.41 8950.:33 -2384.02 -2973.30 5972695.18 681984.98 72.D0 -3990.:08 90.00 MWD 11'125.:00 9p.04 63.41 8950.33 -2652.25 -2951.23 5072707.41 661203.77 f2.C10 -393'5..62' 90.p0 #AWD 17150.:00 90.00 33.41 8950.30 -2841.35 -2928.81 50727 9$.50 361220.77 t 2.Dp -3714 f _47 9D.Op MWD 17175,:04 911:00 60.41 8'950.33 -2632.25 -2908.45 50727,28.40 001262..12 72.D0 -3917.:68 9D.pp MWD 71244.00' 90:D0 72.41 8050.33 -2624.08 -2881.82 5072737,40 081273.56 12.00 -3694.33 94.00 MWD f 1225,:p0 9p:p0 75.41 895p.38 •2617.15 -2857;8...1 5972744.54 061209.42 12.00 -3671.49 9D.Dp MWo 7'7240.42. 90.00 77.22 8050.38 -2413.60 -2843.21 5972748.41 341313.93 ta.DO -3858:D2 9D.o0 M1WD 1725p:00 90.Q0 73.02 8850.36 -2411.29 -2833.50 5072750.03 631323.59 12.04 -3849.1@ 2TO.Op MWD 11275.:00'.. 94.OD 73.42 8050.30 -260+1.32 -2800.41 5072768.13 301347.52 12.D0 -3824..35 270.00 MWD f t300.OD 9p.OD 70.02 8954.38 -2500A9 -2786.71 5972733.57 83137t.OhS f2.o0 -3'8p3,1'0 274.00 MWD 1 t325:OD 94.:DD 37:02 8950.33 -2587.54 -2782.45 5072773.23 831394.10 12.D0 -3779.39 270.00 MWD 7'1354.04 90:OD 61:02 89'x:38 -2577.78 -2730.7D 5072787.09 0014t3A2 12.00 -3755:31 270.00 MWD 11375:OD' 94.dD 31.02 8950.38 -2565.35 •2797:82 5072799.10 86143$.54 12.00 -3730:91 2TD.Op M1N13 t 14p00D' 94:Dd 58.02 8950-30 -2552.9$ -2396:08 5072872.25 361469..79 12.D0 -3]'p3.25 27~D.Op MWD 11425:0D 0p.ff4 55.42 8050:30 -25371.17 -2376.13 5072823.40 X1484.33 12.p0 -3681.42 270.00 MWD 14454.:D4 9p:00 S2.D2 8050-34 -2524.37 -2356.03 5072841.70 861500.A0 13.00 -365347 270.00 MWD 11475,.40 90:04 49:42 8950.33 -2508.42 -2335.74 5972868.10 !161519.04 12.00 -3037.47 270.dp MWD 11500:~ 94:04 43.02 8950:30 -2401.51 -2817:3p 5072875.38 367537.90 i2.p€3 -3Cp6:60 270.Op 1lAWD 11525.:dD' 94:OD 43.02 8050.30 -2473.11 -25.77 5972803.50 7387554.23 12.00 -3587:61 27D.Op MWD 1965O:I10' Bp:OD 461.42 895p.36 ~'~468.00 -2583.2fl 5072912.43 861570:30 12.p0 -3550;89 270.00 MWD 17575.:170' 00.44 37.42 8'95p.3~ -2435.44 -2567.34 5072032.55 001685.52 72.40 -3532.3'9 270..€10 MWD 71590:02 90.:00 35:22 8950.34 -2423.31 -2'558.79 5072944.$3 341504.17 12.00 -3517,81 270.00 MWD ttOp0.00 9p;04 36.41 8950.35 -2415.21 -2552.94 3972963.00 361500.77 12.E -3508.14 00.00 MWD 17825:04 00:00 30.47 8950.33 -2305.49 -2537:58 5972973.14 061614.60 12.00 -3488:69 04.00 MWD 11E5p:04 9p-t1D x2.49 8050.36 -2376.E -252••1.21 5972992..38 041330.34 12.00 -3459:a1 ~.oa RAWO 11675.00 9p.:DD 45.41 8950.33 -2358'.59 -25p3.88 5073010.77 001347.58' 72.D0 -3434..75 94.00 MWD 7 i 700:44 9p.:d4 48.41 8950.33 -2341.52 -2486.02 5073028.24 361635.46 12.p0 -3409.19' 9D.00 MWD 17725.00 90..00 51.41 8'05°0:36 -2325.42 -2436:6D 5973044.75 331384.22 f2.D0 -3384.2D 90.00 MWD 97750.00 90.:00 54.47 8950:346 -2310.35 -2446:54 5973040.25 301703.83 t2.p0 -3359.:23 90.00 MWD 1777.S:D0' 9p,;00 57.41 8050.36 -2206.34 -2425.88 5073074.71 601724.22 92.011 -3334..37 94.00 MWD 718p0.DD' 00:OD 60.41 8050.3E -2283.43 -2441.45 59T3088.D8 061746.34 92.00 -3309..67 90..00 MWD 79825.04 00.00 63.41 8950.33 -2271.66 -2382.30 5973700.33 30...1707.13 12.00 -3285,21' 90.00 MWD 7t$50:00 90..00 68.41 8950.33 -2261.00 -2959.75 5973917.42 661780.53 f2.OL7 -3."~9f.06 90.00 MWD 7f875.OD 94.04 39.47 8950.34 -2251.36 -2336.60 5073121.32 361812.48 12.D0 -329717 90.00 MWD 77894.02 9p:00 71.22 80'.50.33 -3243..60 -2322.45 5073120.60 061828.50 92.D4 -322'3,.99 86.00 MWD 9794p.OD Op:OD 70:D2 8950.30 -2243.29 -2573.03 5973134.31 1101835.84 72.011 -3213,.85 270.40 MWD 17825:04... 9p.Od 37.42 8950.36 -2234.74 -2289.77 5973139.87 001866.89 12.D4 319aD.14 270..00 #A'UWD • • Baker Hughes INT'EQ' ~a~ker Hughe$ ~TTEQ Pl~nnfn~ Report ., «T Compssr: BP Amooe lytta: 9u2QJ200~5 Tian : 08:85:2$ lair: d Fuld: Prudhae Bay Cs~arE} Refsre~ct: We7f: E-21, Trot t~Fordry Site: PH E Pad Vertic=! (i'4'D} )R,afessece: E-21A 03.1 V1 e8: E-2 9 Sectira (1'S) Ra[eriakt~ 1AteM (0.004d,0.0i4E.30,00A~~ eB~ptt)<: P1an3, E-216 Survey Cste~dooa D~aOtieat 93tinimmn- Curvxt~re Dl-: T rade S®rrep 71iD Intl brim SS TtPD X1S FJ9?P 1K>aN MtPE DLS S'S ]rF'O Ttal ti deg deg ~ R 1t R R dagJi00Et R deg 17950:44 90..00 84.02 $450:30 2223.39 -2207.02 54!3150.72 t~01891.aa 12.00 -3188:08 270.E kd9PW0 11875:OD 90.04 61.42 $$50.310 -2212.2+4 2244.85 5473192.74 6$1903.33 12.00 -314'~.SB 2TO,fl~Q hsWD 12000:04 90..00 3$_02. 8950.39 -2199.56 -2223.31 5473175.99 801924.39 12.00 -3117:1#0 270.00 aa9rrt3 12023:04 90.00 35.02: 8930.36 -2785.77 2'202.40 5473190.13 601945.13 12A43 -'~g2.17 210.00 M1~L"~ 12450.40 90.00 52.02 8850:39 -2170.49 2703'.30 5473245.43 691904.99 12.00 -3003.22 270.00 [) 12033.00 90.00 49.42 8'450:30 -2135....02 -Z9Q3.08 59'73229.74 6915483,83 12.00 -342.22 270.110 MVND '12140.00 90..04 441.02 8450..39 -2!38.13 -29+44.93 59'73239.02 692001.99 13.011 -3017.25 270..00 M4V1i9 12125:00 90.04 43.02 8930.30 -212{1.31 -3127.10 59'7.3257.22 692019.02 12.011 -"~2':3S 2?0.0K8 NdV1/D '9.2130:00 90..114 47.42 8950.38 2119,04 -2123.71 54;132'90.97 002022.83 12.00 -2997.41 274.110 11d9ND B P Amet6"~ ~1[~lIi1M fitYY~ ra.,. gar rirw ~..~w iisit:v tir ~ t ANJYr: LHi N.V~ ~ ttatt.U ~ FYn PWr Ks r£.'.P y,s €Y. Br y~ - t.: r,t: •RI A: rt.:~E :7 Try? rJt+11^ ~rI ~~ ~ \I VdCJratlC N:'t~: 3a 'c• 'wary&' 61 Igc•Man Cvr 9:9:x5 BAKER ~:~ tiuf k.~~e - _ HUGHES 1ri b~~ 'y. •. •,1 r?u_~ =~En "~ra~ f fJEI "~~~' irY7rrrscr: ~ B' VI:hc G:Y_ `{ ~ i:E ='~E ~-JCS CO: 57?-. i77-`5'7 - `i O7P tg;r1: 3:5 Emel: DLmKhRe ss"~al:ac~-~ • • • • TERRIE L RUBBLE as-siizsz 226 BP EXPLORATION AK INC '~nnastercard Cneck" ~l PO BOX 196612 MB 7-5 ~'0 • V'~ - ~S ANCHORAGE, AK 99519-661.2 DATE PAY TO THE / ~ ~ ' ~ ~~ ~, ORDER OF I First National Bank Alaska Anchorage,. AK 99501 E- ~t .P=~ _ a~ 10 MEMO f ~:L25200060~:99L4~°62'27~~~L556~~' 0226 a TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~~~_Z,1~- PTD# Zcz~~/~7 CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (PIS records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C\jody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL- 640150 Well Name: PRUDHOE BAY UNIT E-216 Program DEV Well bore seg ^ PTD#:2051470 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV! 1-OIL GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ^ Administration 1 Permit_feeattached__________ ______________________ _ ___Yes_ -__- - - 2 Lease number appropriate------ ----------- ----------- -----------Yes____ 3 Un[quewell_nameandnumb_er --- -- -- -- Yes -- -- --- -- ------- -- -- - - -- -- 4 Welllocaledin_a_tl_efined_pool________________ ___________ ___ Yes.-__.-_. 5 Well locatedproperdistancefromdrillingunit_boundary_____________ ___-.-..-.Yes._--__---________________-.-__-_--_______ 6 Welllgcatedproperdistancefromotherwells--------------__- ___________Yes______________---_----.-_-_________________--_-__--._ 7 Sufficient acreageayail_ablein_dril_lingunit_____________ _______ ___________Yes--__-------_-__________ 8 If_deyiated,is_wellboreplat_included_-_____________________ ___________ Yes____-___- 9 Operator only affected party Yes 10 Operator has_appropriate.bond in force - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 11 Permit_can be issued without conservation order. _ - - - - . _ - - Yes Appr Date 12 Permit can be issued without administrativ_e_appr.oval______________ ___________Yes ____----__--_---__________-__-_-____-._. RPC 10/7/2005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and_strata authorized by-Injection Order # (put-10# in-coomments)_ (For. NA_ 15 All wells_within 1/4_mil_e area_of review identified (For se_rvic_e well only)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ - - _ _ - - _ _ _ _ _ - 16 Pre-produced injector: tlur_ation of pre-production Less than- 3 months-(For service well only) - - NA_ _ _ _ _ _ _ _ _ _ _ _ _ --------------------------------------------------------------- 17 ACMP_FindingofConsistency_hasbeenissued_forthisproject_ _______ ___________ NA______-_-----_---___----__-______-_----.--_._ Engineering 18 Conductor string-provided______________________________ ___________NA________---__,-._-___---- 19 Surface casing.protects all_known USl)Ws - NA - 20 _C_MT_v_ol_adequate_tocirculate-on conductor_&surf_csg_____________ ___________ NA__--_------_--___-__--__--_-__-__--_-------__--__--__-__---_----------__-- 21 CMT-voladequate-totie-in long string to surf csg_______________ ____ ___ __ NA_____________,--_--____--_____ 22 _C_MT_willcoverallkno_w_n_productivehorizon_s___________________ ________ __Yes---_-.-_----_________ ' 23 Casing designs adequate f_or C, T, B &_permafrost Yes _ .. _ _ _ _ 24 Adequate tankage-orr@seryepit-_---_---________________ ____ ______Yes_______CTDU.-----_____ 25 If_a_re-drill, has_a_ 10-403 for abandonment been approved Yes - 10.10712.005. - 26 AdequatewellboreseParation-proposed_____________________ _-_----_-__Yes_-___--__-_-_-__--___-_--,-_____--__---__-_ ----------------------------- 27 If_diverterrequired,doesitmeetregulations___________________ ________ __ NA__-___--Sidet[ack.________ -- - Appr Date 28 Drilling flujd-program schematic.& equip list adequate. Yes Max MW_8,6 ppg; WGA 1011012005 29 _B_OPEs,_dotheymeet_regu_lation__________________________ ___________Yes_____________ _-_--_-.---_-_-_______________ _ 30 BOPE-press rating appropriate; test to-(put psig in comments). - - Yes Test to 3500_ psi. _MSP 23.25 psi.. _ _ - . - - 31 Choke-manifold complies w/API-RP-53GM_ay 84)_________________ ___________Yes_--__----____ ______ -- - 32 Work willoccuCwithoutoperationshutdow_n____________________ ___________Yes_--__----.__-_______________ ----------------------------------------------- 33 Is presence-of H2$ gas.probable No - - - 34 Mechanical_condition of wells within AOR verified (For_service well only) _ - - _ _ - - - _ NA_ Geology 35 Permit-can be issuedw/o_hydrogen_sulfidemeasures_____ ___ ____ ___________ No_--__-_______ _______-___----.-_--_ 36 Data_presentedonpotentialoverpressurezones--------.--_-_ ________NA-----------------------------------__-.-._.---_-__--_--__----____-__-. ____ Appr Date 37 Seismic analysis of shallowgas_zones__ ____________________ _______ __ NA_.--____ -- RPC 10/7/2005 38 Seabed condition suruey_(ifaff-shore) - - - - - - - - - - - - - - - - - NA - 39 Contact name/phone_for_weeklypragress-reports [exploratory only]. NA_ - Geologic Engineering Pub Commissioner: Date: Commissioner: Date Com Date ~r5 ~~~ 1 °~S ~~~~ ~0"~~'~'1 ~° ~~~ • • Pages • ~~_ in the appendix have not 4-~ been microfilmed. • Well History File APPENDIX • Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history tile. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPEtJDIX. No special-effort has been made to chronologically organize this category of information, ~~~~ MAR ~ 9 2008 ~ • • e-21b.tapx Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Feb 21 10:37:14 2008 Reel Header Service name .............LISTPE Date . ...................08/02/21 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................5T5 LIS Writing Library. scientific Technical services Tape Header Service name .............LISTPE Date . ...................08/02/21 Origin ...................STS Tape Name. .... ........UNKNOWN continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS writing Library. Physical EoF Comment Record ~~~~~~ ~~,~ ~- ~ ~~d~ TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: E-21B API NUMBER: 50029205770200 OPERATOR: BP Exploration LOGGING COMPANY: Sperry Drilling TAPE CREATION DATE: 21-FEB-08 JOB DATA MWD RUN 2 MWD RUN 3 JOB NUMBER: W-0004018758 w-0004018758 LOGGING ENGINEER: B. JAHN B. JAHN OPERATOR WITNESS: J. EGBEJIMBA J. EGBEJIMBA MWD RUN 5 MWD RUN 6 JOB NUMBER: w-0004018758 W-0004018758 LOGGING ENGINEER: S. LATZ S. LATZ OPERATOR WITNESS: R. BORDES/B. R. BORDES/B. MWD RUN 8 MAD RUN 8 JOB NUMBER: w-0004018758 w-0004018758 LOGGING ENGINEER: S. LATZ S. LATZ OPERATOR WITNESS: R. BORDES/B. R. BORDES/B. SURFACE LOCATION SECTION: 6 Page 1 scientific Technical services (Alaska) Inc. Services MWD RUN 4 W-0004018758 S. LATZ R. BORDES/B. MWD RUN 7 W-0004018758 S. LATZ R. BORDES/B, ~t~5 =iU~ ~` ~sg ~~ 1 e-21b.tapx TOWNSHIP: 11N RANGE: 14E FNL: 1633 FSL: FEL: 883 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 65.12 DERRICK FLOOR: GROUND LEVEL: 32.08 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 4.125 4.500 10405.0 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS). 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 10405'MD IN THE ORIGINAL E-21 WELLBORE. 4. MWD RUN 1 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG) UTILIZING SCINTILLATION DETECTORS. THE PURPOSE OF THIS RUN WAS TO POSITION THE WHIPSTOCK, MILL THE WINDOW, AND DRILL A BIT OF RAT HOLE. NO DATA ARE PRESENTED. 5. MWD RUNS 2,3,5 COMPRISED DIRECTIONAL AND PCG. 6. MWD RUNS 4,6-8 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (GM) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). UPHOLE DATA GAPS WERE FILLED IN WITH MAD PASS DATA ACQUIRED WHILE POOH AFTER REACHING TD ON MWD RUNS 4,6. THESE MAD DATA WERE MERGED WITH RUNS 4,6 MWD DATA. MAD PASS DATA WERE ALSO ACQUIRED AFTER REACHING FINAL TD ON MWD RUN 8. THESE MAD DATA ARE PRESENTED SEPARATELY. 7. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED-HOLE GAMMA RAY RUN IN THE E-21B WELLBORE ON 7 NOVEMBER 2005. THESE LOG DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 19 DECEMBER 2007. LOG HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. THESE SHIFTED Page 2 e-21b.tapx DATA ARE THE SDCL FOR E-21B. 8. MWD RUNS 1-8 REPRESENT WELL E-21B WITH API#: 50-029-20577-02. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12159'MD/8951'TVDSS. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED NATURAL GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. File Header Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.000 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR FET RPX RPM RPD RPS ROP 1 clipped curves; all bit runs merged. .5000 START DEPTH 10052.0 10400.5 10400.5 10400.5 10400.5 10400.5 10418.5 STOP DEPTH 12111.0 12124.5 12124.5 12124.5 12124.5 12124.5 12155.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 10052.0 10052.5 10053.5 10054.0 10056.0 10055.5 10060.0 10058.5 10067.5 10067.5 10070.0 10069.5 10072.5 10070.5 10077.0 10076.5 10411.0 10415.0 10507.5 10510.0 Page 3 ~J e-21b.tapx 10514.0 10518.5 10525.5 10528.5 10571.0 10571.0 10611.0 10611.0 10621.0 10622.5 10642.0 10642.5 10677.5 10680.5 10687.5 10690.5 10698.5 10701.0 10704.0 10707.0 10712.5 10715.5 10716.0 10718.5 10717.5 10719.5 10729.0 10730.5 10741.5 10743.5 10748.0 10750.5 10750.5 10753.0 10782.5 10784.0 10794.0 10795.0 10834.5 10835.5 10875.5 10875.5 10904.5 10905.0 10934.0 10934.0 10980.5 10981.0 11009.5 11009.5 11032..5 11031.5 11035.5 11035.5 11050.5 11050.5 11103.0 11105.0 11117.0 11119.0 11131.5 11131.5 11143.0 11143.0 11198.0 11197.0 11219.0 11219.0 11313.5 11316.0 11317.5 11320.0 11323.0 11326.5 11397.0 11397.5 11410.5 11410.0 11424.0 11429.5 11432.0 11437.5 11437.0 11442.0 11445.0 11451.0 11472.5 11477.0 11481.5 11489.0 11484.0 11491.5 11489.5 11498.0 11498.5 11506.0 11503.0 11510.5 11516.5 11522.5 11525.5 11532.0 11570.0 11578.5 11622.5 11626.5 11635.0 11638.5 11641.0 11644.0 11650.5 11653.5 11682.5 11688.5 11694.5 11701.5 11735.0 11744.5 11743.5 11752.0 11746.0 11754.0 11748.0 11756.0 11750.0 11757.0 Page 4 11756.0 11767.0 11779.0 11786.5 11790.5 11793.0 11795.0 11801.0 11805.0 11810.5 11812.0 11813.5 11827.0 11912.0 11918.0 11960.5 11966.0 11976.5 12002.0 12155.5 MERGED DATP. SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD MWD REMARKS: 11762.0 11774.5 11786.0 11793.5 11796.5 11801.0 11803.0 11808.5 11815.5 11819.0 11820.5 11823.5 11836.5 11919.5 11925.0 11964.0 11968.0 11979.5 12005.5 12159.0 e-21b.tapx BIT RUN NO MERGE TOP MERGE BASE 2 10052.5 10492.0 3 10492.0 10775.0 4 10775.0 10783.0 5 10783.0 10848.0 6 10848.0 11450.0 7 11450.0 11654.0 8 11654.0 12159.0 MERGED MAIN PASS. Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Di rection .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing...... .. ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10052 12155.5 11103.8 4208 10052 12155.5 Page 5 e-21b.tapx RPD MWD OHMM 0.14 2000 27.1603 3449 10400.5 12124.5 RPM MWD OHMM 0.1 2000 20.0627 3449 10400.5 12124.5 RPS MWD OHMM 1.3 2000 20.2505 3449 10400.5 12124.5 RPX MWD OHMM 1.06 2000 16.639 3449 10400.5 12124.5 FET MWD HOUR 0.3 57.57 7.83516 3449 10400.5 12124.5 GR MWD API 14.52 589.09 58.8557 3517 10052 12111 ROP MWD FT/H 0.02 1570.91 58.843 3475 10418.5 12155.5 First Reading For Entire File..........10052 Last Reading For Entire File...........12155.5 File Trailer Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLI6.002 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR FET RPS RPM RPD RPX RAT MERGED DATA SOURCE PBU TOOL CODE MWD REMARKS: MERGED MAD PASS. Data Format Specification Record Data Record Type ..................0 clipped curves; all MAD runs merged using earliest passes. .5000 START DEPTH 10875.0 10889.0 10889.0 10889.0 10889.0 10889.0 10921.5 STOP DEPTH 12059.5 12073.5 12073.5 12073.5 12073.5 12073.5 12104.5 MAD RUN NO. MAD PASS NO. 8 1 Page 6 MERGE TOP MERGE BASE 10876.5 12159.0 e-21b.tapx Data specification Block Type.....0 Logging Direction .................DOwn Optical log depth units....,......Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MAD OHMM 4 1 68 4 2 RPM MAD OHMM 4 1 68 8 3 RPS MAD OHMM 4 1 68 12 4 RPX MAD OHMM 4 1 68 16 5 FET MAD HOUR 4 1 68 20 6 GR MAD API 4 1 68 24 7 RAT MAD FT/H 4 1 68 28 8 First Last Name servi ce unit Min Max Mean Nsam Reading Reading DEPT FT 10875 12104.5 11489.8 2460 10875 12104.5 RPD MAD OHMM 11.09 33.83 22.5648 1322 10889 12073.5 RPM MAD OHMM 6.59 28.68 15.8908 1322 10889 12073.5 RPS MAD OHMM 6.55 28.02 14.2615 1322 10889 12073.5 RPX MAD OHMM 4.78 21.77 12.0034 1322 10889 12073.5 FET MAD HOUR 6.13 86.89 68.8616 1322 10889 12073.5 GR MAD API 22.93 112.65 55.7221 1317 10875 12059.5 RAT MAD FT/H 299 1448 703.131 1323 10921.5 12104.5 First Reading For Entire File..........10875 Last Reading For Entire File...........12104 File Trailer Service name... ......STSLI6.002 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name... .......sTSLI6.003 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.002 comment Record FILE HEADER FILE NUMBER: Page 7 e-21b.tapx RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10052.5 10461.5 ROP 10422.5 10492.0 LOG HEADER DATA DATE LOGGED: 31-OCT-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 7.75 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10492.0 TOP LOG INTERVAL (FT): 10405.0 BOTTOM LOG INTERVAL (FT): 10492.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 44.2 MAXIMUM ANGLE: 50.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG015 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 10405.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 63.0 MUD PH: 9.5 MUD CHLORIDES (PPM): 18000 FLUID Loss (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 137.5 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Page 8 e-21b.tapx Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD020 API 4 1 68 4 2 ROP MWD020 FT/H 4 1 68 8 3 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 10052.5 10492 10272.3 880 10052.5 10492 GR MWD020 API 14.52 589.09 55.8739 209 10052.5 10461.5 ROP MWD020 FT/H 0.02 28.15 3.38864 140 10422.5 10492 First Reading For Entire File..........10052.5 Last Reading For Entire File...........10492 File Trailer Service name... .......STSLI6.003 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.004 Physical EOF File Header Service name... .......STSLIB.004 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.003 comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10462.0 10747.0 ROP 10492.5 10775.0 LOG HEADER DATA DATE LOGGED: O1-NOV-05 Page 9 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GM Dual GR BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): e-21b.tapx BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (5): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units ............ ......... Datum specification Block sub-type...0 • Insite 4.3 Memory 10775.0 10492.0 10775.0 42.2 75.5 TOOL NUMBER 72829 4.125 10405.0 F10 Pro 8.60 65.0 9.0 18000 4.6 .000 .0 .000 141.0 .000 .0 .000 .0 Name Service Order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD030 API 4 1 68 4 2 ROP MWD030 FT/H 4 1 68 8 3 Page 10 e-21b.tapx First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10462 10775 10618.5 627 10462 10775 GR MWD030 API 14.97 175.44 40.0245 571 10462 10747 ROP MWD030 FT/H 0.07 110.44 33.4901 566 10492.5 10775 First Reading For Entire File..........10462 Last Reading For Entire File...........10775 File Trailer Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File TyL~e ................L0 Next Fife Name...........STSLIB.005 Physical EOF File Header Service name... .......sTSLI6.005 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPx 10404.5 10756.0 RPM 10404.5 10756.0 RPD 10404.5 10756.0 FET 10404.5 10756.0 RPS 10404.5 10756.0 ROP 10775.5 10783.0 LOG HEADER DATA DATE LOGGED: 02-NOV-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10783.0 TOP LOG INTERVAL (FT): 10775.0 BOTTOM LOG INTERVAL (FT): 10783.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG Page 11 • ~ e-21b.tapx MINIMUM ANGLE: 75.5 MAXIMUM ANGLE: 75.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 78005 EWR4 ELECTROMAG. RESIS. 4 178425 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 10405.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 18000 FLUID LOSS (C3): 4.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .120 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .060 142.0 MUD FILTRATE AT MT: .160 68.0 MUD CAKE AT MT: .150 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 Name service order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD040 OHMM 4 1 68 4 2 RPM MWD040 OHMM 4 1 68 8 3 RPS MWD040 OHMM 4 1 68 12 4 RPX MWD040 OHMM 4 1 68 16 5 FET MWD040 HOUR 4 1 68 20 6 ROP MWD040 FT/H 4 1 68 24 7 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10404.5 10783 10593.8 758 10404.5 10783 Page 12 e-21b.tapx RPD MWD040 OHMM 0.14 2000 45.2076 704 10404.5 10756 RPM MWD040 OHMM 0.1 2000 29.0716 704 10404.5 10756 RPS MWD040 OHMM 1.3 2000 33.2423 704 10404.5 10756 RPX MWD040 OHMM 1.06 2000 20.8939 704 10404.5 10756 FET MWD040 HOUR 11.6 57.57 26.3181 704 10404.5 10756 ROP MWD040 FT/H 1.4683 2.31 1.88917 16 10775.5 10783 First Reading For Entire File..........10404.5 Last Reading For Entire File...........10783 File Trailer Service name... .......STSLIB.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.006 Physical EOF File Header Service name... .......STSLIB.006 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.005 comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10747.5 10820.0 ROP 10783.5 10848.0 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) Page 13 02-NOV-05 Insite 4.3 Memory 10848.0 10783.0 10848.0 83.7 85.6 VENDOR TOOL CODE TOOL TYPE GM Dual GR BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): e-21b.tapx TOOL NUMBER 72829 4.125 10405.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Flo Pro 8.60 65.0 9.5 19000 5.6 .000 .0 .000 130.8 .000 .0 .000 .0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD050 API 4 1 68 4 2 ROP MWD050 FT/H 4 1 68 8 3 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 10747.5 10848 10797.8 202 10747.5 10848 GR MWD050 API 32.43 123.62 52.3793 146 10747.5 10820 ROP MWD050 FT/H 1.3 94.43 59.0566 130 10783.5 10848 First Reading For Entire File..........10747.5 Last Reading For Entire File...........10848 File Trailer Page 14 f i e-21b.tapx Service name... .......STSLIB.006 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Ty[~ e ................L0 Next File Name...........STSLIB.007 Physical EOF File Header Service name... .......STSLIB.007 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.006 comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 10756.5 11418.5 FET 10756.5 11418.5 RPS 10756.5 11418.5 RPM 10756.5 11418.5 RPD 10756.5 11418.5 GR 10820.5 11405.5 OP 10848.5 11450.0 $ LOG HEADER DATA DATE LOGGED: 03-NOV-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11450.0 TOP LOG INTERVAL (FT): 10848.0 BOTTOM LOG INTERVAL (FT): 11450.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 86.2 MAXIMUM ANGLE: 95.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 78005 EWR4 ELECTROMAG. RESIS. 4 178425 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 10405.0 Page 15 • e-21b.tapx BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (s): 65.0 MUD PH: 9,Q MUD CHLORIDES (PPM): 18000 FLUID LOSS (C3): 4.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .120 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .060 150.0 MUD FILTRATE AT MT: .160 68.0 MUD CAKE AT MT: .150 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep code offset Channel DEPT FT 4 1 68 0 1 RPD MWD060 OHMM 4 1 68 4 2 RPM MWD060 OHMM 4 1 68 8 3 RPS MWD060 OHMM 4 1 68 12 4 RPX MWD060 OHMM 4 1 68 16 5 FET MWD060 HOUR 4 1 68 20 6 GR MWD060 API 4 1 68 24 7 ROP MWD060 FT/H 4 1 68 28 8 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 10756.5 11450 11103.3 1388 10756.5 11450 RPD MWD060 OHMM 14.62 28.17 21.5808 1325 10756.5 11418.5 RPM MWD060 OHMM 11.63 23.03 16.9654 1325 10756.5 11418.5 RPS MWD060 OHMM 11.1 23.43 16.2464 1325 10756.5 11418.5 RPX MWD060 OHMM 8.06 23.93 15.3204 1325 10756.5 11418.5 FET MWD060 HOUR 0.32 33.94 2.99311 1325 10756.5 11418.5 GR MWD060 API 33.06 96.43 66.8129 1171 10820.5 11405.5 ROP MWD060 FT/H 1.14 502.11 68.0304 1204 10848.5 11450 First Reading For Entire File..........10756.~ Last Reading For Entire File...........11450 Page 16 e-21b.tapx File Trailer Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.008 Physical EOF File Header Service name... .......STSLIB.008 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11406.0 11611.5 RPS 11419.0 11625.0 RPM 11419.0 11625.0 RPD 11419.0 11625.0 FET 11419.0 11625.0 RPX 11419.0 11625.0 ROP 11450.5 11654.0 LOG HEADER DATA DATE LOGGED: 05-NOV-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME}; Memory TD DRILLER (FT): 11654.0 TOP LOG INTERVAL (FT): 11450.0 BOTTOM LOG INTERVAL (FT): 11654.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 93.0 MAXIMUM ANGLE: 96.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 78005 EWR4 ELECTROMAG. RESIS. 4 178425 Page 17 a e-21b.tapx BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 10405.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 19000 FLUID LOSS (C3): 4.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATU RE (MT): .600 93.0 Ml1D AT MAX CIRCULATING TE RMPERATURE: .390 148.0 MUD FILTRATE AT MT: .160 71.0 MUD CAKE AT MT: .100 65.0 NEUTRON TOOL MATRIX; MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ....... ...0 Data specification Block Type.. ...0 Loging Direction .............. ...Down Optical log depth units........ ...Feet Data Reference Point ........... ...undefined Frame Spacing....... ......... ...60 .lIN Max frames per record .......... ...undefined Absent value ................... ...-999 Depth units. .. .. .. ... Datum specification Block sub-t ype...0 Name service order units size Nsam Rep code offset Cha nnel DEPT FT 4 1 68 0 1 RPD MWD070 OHMM 4 1 68 4 2 RPM MWD070 OHMM 4 1 68 8 3 RPS MWD070 OHMM 4 1 68 12 4 RPX MWD070 OHMM 4 1 68 16 5 FET MwD070 HOUR 4 1 68 20 6 GR MWD070 API 4 1 68 24 7 ROP MwD070 FT/H 4 1 68 28 8 First Last Name service Unit Min Max Mean Ns am Reading Reading DEPT FT 11406 11654 11530 497 11406 11654 RPD MWD070 OHMM 11.57 26.85 19.9183 413 11419 11625 RPM MWD070 OHMM 6.67 22.93 16.2396 413 11419 11625 RPS MWD070 OHMM 6.31 23.32 15.505 413 11419 11625 RPX MWD070 OHMM 6.02 23.43 14.0861 413 11419 11625 FET MwD070 HOUR 0.3 26.78 5.21082 413 11419 11625 GR MWD070 API 27.45 185.25 75.7734 412 11406 11611.5 ROP MWD070 FT/H 0.5 129.81 72.9653 408 11450.5 11654 Page 18 ~ ~ e-21b.tapx First Reading For Entire File..........11406 Last Reading For Entire File...........11654 File Trailer Service name... .......STSLIB.008 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.009 Physical EOF File Header service name... .......STSLI6.009 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSL26.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11612.0 12114.5 FET 11625.5 12128.0 RPS 11625.5 12128.0 RPM 11625.5 12128.0 RPX 11625.5 12128.0 RPD 11625.5 12128.0 ROP 11654.5 12159.0 LOG HEADER DATA DATE LOGGED: 06-NOV-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 12159.0 TOP LOG INTERVAL (FT): 11654.0 BOTTOM LOG INTERVAL (FT): 12159.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 83.2 MAXIMUM ANGLE: 92.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 82758 Page 19 ~ ~ e-21b.tapx EWR4 ELECTROMAG. RESIS. 4 178425 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 10405.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 19000 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .600 93.0 MUD AT MAX CIRCULATING TERMPERATURE: .360 158.9 MUD FILTRATE AT MT: .160 71.0 MUD CAKE AT MT: .100 .7 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD080 OHMM 4 1 68 4 2 RPM MWD080 OHMM 4 1 68 8 3 RPS MWD080 OHMM 4 1 68 12 4 RPX MWD080 OHMM 4 1 68 16 5 FET MWD080 HOUR 4 1 68 20 6 GR MWD080 API 4 1 68 24 7 ROP MWD080 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11612 12159 11885.5 1095 11612 12159 RPD MWD080 OHMM 16.49 36.13 24.9241 1006 11625.5 12128 RPM MWD080 OHMM 10.39 30.94 19.5526 1006 11625.5 12128 RPS MWD080 OHMM 8.77 29.45 18.549 1006 11625.5 12128 RPX MWD080 OHMM 6.4 27.96 16.604 1006 11625.5 12128 FET MWD080 HOUR 0.35 11.95 2.25581 1006 11625.5 12128 Page 20 • e-21b.tapx GR MWD080 API 24.02 157.12 54.5381 1006 11612 12114.5 ROP MWD080 FT/H 1.23 1570.91 65.3965 1010 11654.5 12159 First Reading For Entire File..........11612 Last Reading For Entire File...........12159 File Trailer Service name... .......STSLI6.009 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.010 Physical EOF File Header Service name... .......STSLIB.O10 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.009 Comment Record FILE HEADER FILE NUMBER: 10 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 8 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10876.5 12062.5 FET 10890.5 12076.5 RPX 10890.5 12076.5 RPS 10890.5 12076.5 RPM 10890.5 12076.5 RPD 10890.5 12076.5 RAT 10922.5 12107.5 LOG HEADER DATA DATE LOGGED: 06-NOV-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 12108.0 TOP LOG INTERVAL (FT): 10922.0 BOTTOM LOG INTERVAL (FT): 12108.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 83.2 MAXIMUM ANGLE: 92.8 Page 21 e-21b.tapx TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 82758 EWR4 ELECTROMAG. RESIS. 4 178425 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 10405.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 19000 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .600 93.0 MUD AT MAX CIRCULATING TERMPERATURE: .360 158.9 MUD FILTRATE AT MT: .160 71.0 MUD CAKE AT MT: .100 .7 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Loging Di rection .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MAD081 OHMM 4 1 68 4 2 RPM MAD081 OHMM 4 1 68 8 3 RPS MAD081 OHMM 4 1 68 12 4 RPX MAD081 OHMM 4 1 68 16 5 FET MAD081 HOUR 4 1 68 20 6 GR MAD081 API 4 1 68 24 7 RAT MAD081 FT/H 4 1 68 28 8 First Name Service Unit Min Max Mean Nsam Reading DEPT FT 10876.5 12 107.5 11492 2463 10876.5 RPD MAD081 OHMM 11.09 33.83 22.54 1325 10890.5 Page 22 Last Reading 12107.5 12076.5 ~ ~ e-21b.tapx RPM MAD081 OHMM 6.59 28.68 15.86 1325 10890.5 12076.5 RPS MAD081 OHMM 6.55 28.02 14.2321 1325 10890.5 12076.5 RPX MAD081 OHMM 4.78 21.77 11.9811 1325 10890.5 12076.5 FET MAD081 HOUR 6.13 86.89 68.9296 1325 10890.5 12076.5 GR MAD081 API 22.93 112.65 55.7785 1320 10876.5 12062.5 RAT MAD081 FT/H 299 1448 703.181 1327 10922.5 12107.5 First Reading For Entire File..........10876.5 Last Reading For Entire File...........12107.5 File Trailer Service name... .......STSLIB.O10 Service Sub Level~Name... version Number. ........1.0.0 Date of Generation.......08/02/21 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.011 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/02/21 Origin ...................STS Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS writing Library Reel Trailer Service name .............LISTPE Date . ...................08/02/21 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library Physical EOF Physical EOF End Of LIS File scientific Technical services scientific Technical services Page 23