Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-253
THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03,2001 M p i A T E E IA L U N u W T H IS M ARK ER C :LOR.IXMFILM.DOC Well Compliance Report File on Left side of folder ._ 197-253-0 MD 14050'~ pRUDHOE BAY ~ i3'~02B ....... ~02 029220324~02 ~0' . TVD 08740 ~ o[~mpletion Date: ~/2/98 Completed Status: 1-OIL Current: SQZED T Name Interval Sent Received T/C/l) D 8726 SPERRY GR PB1 D 8755 SPERRY GR PB2 D 8756 c/f C-10 SPERRY GR PB3 D 8757 /--~6-15 SPERRY GR L MEMGR/CCL/DEPTH ~A~ 9998-10413 &-~AL 10528-8045 ~INAL 9201-9969 PB1 ~INAL 6577-14050 L MEM GR/CCL/JWL L NGP-MD L NGP-MD L NGP-MD L NGP-MD L NGP-TVD L NGP-TVD L NGP-TVD L NPG-TVD R MWD SRVY R SRVY RPT (f~NAL 9041-9362 PB2. iffiNAL 6577-12015 PB~ Lff~AL 8465-8779 PBI" ~I/INAL 6092-8751 PB3. ff/1NAL 8315-8452 PB2 .A~rlN A L 6092-8741 SPERRY 9089.5-9965.PBI ~ Y 8992.05-9362. PB2 ~ R SRVY RPT SPERRY 10775.26-14050.j' R SRVY RPT SPERRY 3410-12015 PB3~// Daily Well Ops }//(/f/_~"~ ~//)~ ~ Was the well cored? yes ~ Comments: OH 9/30/98 9/30/98 OH 10/7/98 10/7/98 OH 10/7/98 10/7/98 OH 10/7/98 10/7/98 CH 2 3/4/99 3/11/99 CH 2 3/4/99 3/11/99 OH 9/30/98 9/30/98 OH 10/14/98 10/14/98 OH 10/14/98 10/14/98 OH 10/14/98 10/14/98 OH 9/30/98 9/30/98 OH 10/14/98 10/14/98 OH 10/14/98 10/14/98 OH 10/14/98 10/14/98 OH 3/5/98 3/5/98 OH 6/15/98 6/19/98 OH 6/15/98 6/19/98 OH 6/15/98 6/19/98 Are Dry Ditch Samples Required? yes ( n~.~ And Rec~ Analysis Description Remekv. gd.?~~o Sam~ Monday, May 01,2000 Page 1 of 1 O F! I I_1_ I rll (S WELI~ LOG TRANSMITTAL To: State of Alaska October 14, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Lod Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs D.S. 13-02B, 13-02B PB2 & PB3, AK-MW-80166 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention off Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 DS 13-02B: 2" x 5" MD Gamma Ray Logs: 50-029-20324-02 2" x 5" TVD Gamma Ray Logs: 50-029-20324-02 DS 13-02B PB2: 2" x 5" MD Gamma Ray Logs: 50-029-20324-71 2"x 5" TVD Gamma Ray Logs: 50-029-20324-71 DS 13-02B PB3: 2" x 5" MD Gamma Ray Logs: 50-029-20324-72 2"x 5" TVD Gamma Ray Logs: 50-029-20324-72 A}a~a 0~ & Gas Cons. 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 0 I:::~ I I--I-- I [M 13 WELL LOG TRANSMITTAL To: State of Alaska October 7, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 :'r RE: MWD Formation Evaluation Logs - D.S. 13-02B PB2, AK-MW-80166 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listings. API#: 50-029-20324-71. 5631 Silverado Way, Suite G -Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 0 !:! I I--I--I IM G S I~ !:! ~J I C I~: S WELL LOG TRANSMITTAL To~ State of Alaska October 7, 1998 Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor :.. Anchorage, Alaska 99501 E~ ~ 9 I'~--~ MWD Formation Evaluation Logs - D.S. 13-02B, AK-MW-80166 The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, Cfi3, Anchorage, AK 99518 1 LDWG formatted Disc with verification listings. APl#: 50-029-20324-02. OCT 07 1998 A,haska ~t & Gas Cans. Commission Anchorage 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 · (907) 273-3500. Fax (907) 273-3535 ri F:I I I_1_ I I~ r= S I~: I~1 I-- Im S WELL LOG TRANSMITTAL To: State of Alaska October 7, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - D.S. 13-02B PB3, AK-MW-80166 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listings. APl#: 50-029-20324-72. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500. Fax (907) 273-3535 WELL LOG TRANSMITTAL To~ State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs D.S. 13-02B PB], _&K-MW-80094 September 30. 1998 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' .Ali Turker, Sperry-Sun Drilling Services. 5631 Silverado Way, #G, 'Anchorage, AK 99518 D.S. 13-02B PB1: 2" x 5" MD Gamma Ray Logs: 50-029-20324-70 2"x 5" TVD Gamma Ray Logs: 50-029-20324-70 1 Blueline 1 Folded Sepia 1 Blueline Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Dresser Industries, Inc. Company 0 Ft I I--I--I IM G SEFIL~ICE S WELL LOG TRANSM1TT~ To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 ~ ~ ~ ~'~ ~' ~ RE: MWD Formation Evaluation Logs - D.S. 13-02B PB1, AK-MW-80094 September 30, 1998 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listings. API#: 50-029-20324-70. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Dresser Industries. Inc. Comaanv D I::t I !_/I I~ Oi S I~ I::! ~ I C I:: S 15-Jun-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re' Distribution of Survey Data for Well 13-02B PB2 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 8,992.05' MD 9026' MD 9,362.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) JUN 1 q ,;.'.-.. Oil & G~s L;ons. ~ommi~on 5631 Silverado Way, Suite G · Anchorage, A~aska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company [:]FIll_L-lNG SEFIVICES 15-Jun-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 13-02B Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 10,775.26' MD 10806' MD 14,050.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 19 199 J 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company D I::i I I-I-- I I~ CS SGI:I~I CI~ S 15-Jun-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 13-02B PB3 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 3,410.00' MD 3418' MD 12,015.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) dUN 1 9 ~,99~ AJ~ka Oil & Oas Cons. 6ommi~on ~chorage 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKA ~L AND GAS CONSERVATION COM~flSSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pulp Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator ARCO Alaska Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2171' NSL, 31' WEL, SEC. 14, T10N, R14E, UM At top of productive interval 4208' NSL, 1473' EWL, SEC. 13, T10N, R14E, UM At effective depth N/A At total depth 4545' NSL, 2063' EWL, SEC. 13, T10N, R14E, UM (Planned) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 14050 feet 8737 feet feet feet (Planned) 5. Type of well: [] Development [] Exploratory [] Stratigraphic [--] Service Plugs (measured) Junk (measured) . Datum Elevation (DF or KB) Plan KBE = 74.30' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 13-02B 9. Permit Number 97-253 / 398-030 / 398-083 10. APl Number 50-029-20324-02 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool Casing Length Size Structural Conductor 127' 20" Surface 2741' 13-3/8" Intermediate 3457' 9-5/8" Production 8953' 7" Liner 4162' 4-1/2" Cemented 167 sx Class 'G' 7600 sx Class 'G' 1000 sx Class 'G' 190 sx Class 'G' Uncemented Slotted Liner MD TVD 127' 127' 2741' 2741' 3457' 3457' 1073'-10036' 1073'-8741' 8986'-13148' 7976'-8728' Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None ORIG! - A£ 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation 15. Status of well classifications as: April 30, 1998 16. If proposal was verbally approved [] Oil [] Gas [] Suspended Service Name of approver Date approved Contact Engineer Name/Number: M. S.,¢heuring, ,~64/8~9 Greg West, 564-4803 Prepared By Name/Number: 17. I hereby certify that the fd/egoing/s,t~u~ and correct to the best of my knowledge Signed [~//~ '~.. /ft///"l,~_ TimA. Burns Ij ~i /A~ /~1~. Title Senior Drilling Engineer Commission Use Only Conditions of Approval: Notify Commission so representative may witness Terrie Hubble, 564-4628 Date I Approval Plug integrity __ BOP Test __ Location clearance__ Mechanical Integrity Test __ Subsequent form required 10- /¢ c~ }' · ~,~.~,~¢.d O09"J 0r~ginal Signed ~y '-" "- 6 ... '*"'R.~vlfoe_ ~ Commissioner Approved by order of the Commission rlavid w Johnston Form 10-403 Rev. 06/15/88 .~_'~ Submit In Triplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [~ Oil [-~ Gas [] Suspended ~] Abandoned [] Service 21 Name of Operator 7. Pe'~mit Number ARCO Alaska Inc. 97-253 398-030 / 083 / 123 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20324-02 4. Location of well at surface 9. Unit or Lease Name 2171' NSL, 31' WEL, SEC. 14, T10N R14E, UM :',;."' '.-' .- , .~~¢~ Prudhoe Bay Unit At top of productive interval ? ~ -..'~- --'~; 1'0."' Well"Number 4816' NSL, 2551' EWL, SEC. 13, T10N, R14E, UM --"~--~ :: '~ - ~ 13-02B At total depth ~11. Field and Pool Ns,, s o. - .... j~' "7 ' ~ '--~. Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, 'DF, etc.) 16. LeaSe DesignatiOh a~d Serial No. Pool KBE = 75.50'I ADL 028330 ¥2.'Date Spudded I 13. Date 'I'.D. Reached ! 14. Date Comp., Susp., or ^band.Il 5. Water depth, ,f offshore 116. No. of Completions 1/24/98 4/28/98 5/2/98 . N/A MSLI One 14050 8740 FrI 14050 8740 FTI ~Yes [~Noi 2057' MD[ 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, RES, GR, DIR, DD, FE 23. CAS~NG~ LINER AND CEMENTING RECORD CASING SE'FrING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 127' 24" 167 sx Arcticset II 13-3/8" 72# N-80 Surface 2741' 17-1/2" 7600 sx Arcticset II 9-5/8" 47# N-80 Surface 3419' 12~1/4" 1000 sx Class 'G' 7" 26# L~80" 1073' 10036' '8-1/2'' 190 sx Class 'G' 4-1/2" :i 2.6# L-80 9028' 13177' 6" Uncemented Slotted Liner (3-1/2" XO to 4-1/2" XO to 5" Casing) 24. Perf°'rations ~)pen to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 4'1/2", 12.6#, L-80 9019' 8965' MD TVD MD TVD 9570' - 13157' 8406' - 8728' ....... 26. AC,D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED · Freeze Protect with 110 Bbls of Diesel · ..... . 27. PRODUCTION TEST Date First Production I Method of Operatior~ (Flowing, gas lift, etc.) · May 7, 1998 ~ Gas Lift Date of Test Hours Tested PRODUCTION FoR OIL-DEL GAS-MCF WATER-BBL CHOKE SIZE JGAS-OIL RATIO TEST PERIOD I Flow Tubing Casin~j Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAViTY-APl (CORR) Press. 24-HOUR RATE , 28. CORE DATA . Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. :- Pnrm ln-4r17 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. , ,, Sag River 10030' 8737' Shublik 10067' 8760' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foreg'oi'ng is true and correct to the best of my knowledge SignedDanStone ~--~------~' ~ ' ~ Title Engineering Supervisor' Date 6'/~/"i'~.. 13-02B 97-253 398-030 / 083 / Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / APproval No, INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other ~paces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, S .hFt4n, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility PB DS 13 Progress Report Well 13-02B Page 1 Rig Doyon 14 Date 06 May 98 Date/Time 19 Jan 98 20 Jan 98 21 Jan 98 22 Jan 98 23 Jan 98 00:01-00:30 00:30-02:00 02:00-04:00 04:00-06:00 06:00-08:00 08:00-12:00 12:00-12:30 12:30-13:30 13:30-18:00 18:00-21:30 21:30-02:00 02:00-03:00 03:00-05:30 05:30-06:00 06:00-09:30 09:30-11:00 11:00-12:00 12:00-12:30 12:30-14:30 14:30-14:45 14:45-17:00 17:00-18:00 18:00-19:00 19:00-20:00 20:00-22:30 22:30-00:00 00:00-03:00 03:00-04:30 04:30-06:00 06:00-13:30 13:30-14:30 14:30-15:30 15:30-16:00 16:00-19:30 19:30-21:30 21:30-22:30 22:30-00:00 00:00-01:00 01:00-01:30 01:30-06:00 06:00-07:00 07:00-08:00 08:00-08:30 08:30-09:30 09:30-16:00 16:00-16:30 16:30-17:00 17:00-19:30 19:30-22:00 22:00-22:15 22:15-23:00 23:00-01:30 01:30-02:00 02:00-03:00 Duration 1/4 hr 1-1/2 hr 2 hr 2 hr 2 hr 4 hr 1/2 hr 1 hr 4-1/2 hr 3-1/2 hr 4-1/2 hr 1 hr 2-1/2 hr 1/2 hr 3-1/2 hr 1-1/2 hr 1 hr 1/2 hr 2 hr 1/4 hr 2-1/4 hr 1 hr 1 hr 1 hr 2-1/2 hr 1-1/2 hr 3 hr 1-1/2 hr 1-1/2 hr 7-1/2 hr 1 hr 1 hr 1/2 hr 3-1/2 hr 2 hr 1 hr 1-1/2 hr 1 hr 1/2 hr 4-1/2 hr 1 hr 1 hr 1/2 hr 1 hr 6-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 1/4 hr 3/4 hr 2-1/2 hr 1/2 hr 1 hr Activity Held safety meeting Rigged down High pressure lines Rig moved 15.00 % Rig moved 40.00 % Rig moved 65.00 % Rig moved 85.00 % Held safety meeting Rig moved 100.00 % Rigged up Lines ! Cables Removed Accessories Circulated at 9450.0 ft Installed Accessories Removed Xmas tree Rigged up BOP stack Rigged up BOP stack Rigged up Pipe ram Rigged up Bell nipple Held safety meeting Tested Choke manifold Tested Blind ram Tested Top ram Retrieved Accessories Retrieved Accessories Installed Well control Installed Tubing retrieval string Laid down 80.0 ft of Tubing Retrieved Seal assembly Removed BOP stack Removed Seal assembly Rigged down Seal assembly Installed Seal assembly Rigged up BOP stack Tested Seal assembly Tested BOP stack Injected packing Tested BOP stack Rigged down sub-surface equipment - Other sub-surface equipment Rigged up Tubing handling equipment Circulated at 9370.0 ft Laid down 2200.0 ft of Tubing Rigged down sub-surface equipment - Other sub-surface equipment Laid down 1129.0 ft of Tubing Rigged up Tubing handling equipment Serviced Block line Laid down 6094.0 ft of Tubing Removed Tubing handling equipment Rigged up Logging/braided cable equipment Conducted electric cable operations Conducted electric cable operations Removed Logging/braided cable equipment Tested Casing Rigged up Top ram Installed BOP test plug assembly Tested Top ram Progress Report Facility PB DS 13 Well 13-02B Rig Doyon 14 Page 2 Date 06 May 98 Date/Time 24 Jan 98 25 Jan 98 26 Jan 98 27 Jan 98 03:00-03:30 03:30-06:00 06:00-07:30 07:30-10:00 10:00-10:30 10:30-16:00 16:00-18:00 18:00-19:00 19:00-00:00 00:00-01:30 01:30-04:00 04:00-06:00 06:00-08:30 08:30-11:00 11:00-11:30 11:30-16:30 16:30-17:00 17:00-06:00 06:00-14:30 14:30-16:00 16:00-18:00 18:00-19:30 19:30-20:30 20:30-23:00 23:00-00:00 00:00-01:30 01:30-02:30 02:30-02:45 02:45-03:00 03:00-06:00 06:00-06:30 06:30-16:30 16:30-17:00 17:00-18:30 18:30-21:00 21:00-22:00 22:00-01:00 01:00-02:30 02:30-05:00 05:00-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-08:00 08:00-09:00 09:00-11:00 11:00~14:00 14:00-14:30 14:30-16:00 16:00-19:00 19:00-20:00 20:00-20:30 20:30-21:30 21:30-22:30 Duration 1/2 hr 2-1/2 hr 1-1/2 hr 2-1/2 hr 1/2 hr 5-1/2 hr 2 hr 1 hr 5 hr 1-1/2 hr 2-1/2 hr 2 hr 2-1/2 hr 2-1/2 hr 1/2 hr 5 hr 1/2 hr 13hr 8-1/2 hr 1-1/2 hr 2 hr 1-1/2 hr 1 hr 2-1/2 hr 1 hr 1-1/2 hr 1 hr 1/4 hr 1/4 hr 3 hr 1/2 hr 10hr 1/2 hr 1-1/2 hr 2-1/2 hr 1 hr 3hr 1-1/2 hr 2-1/2 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1 hr 2 hr 3 hr 1/2 hr 1-1/2 hr 3 hr 1 hr 1/2 hr 1 hr I hr Activity Serviced BOP test plug assembly Made up BHA no. 1 Made up BHA no. 1 R.I.H. to 3470.0 ft Circulated at 3470.0 ft R.I.H. to 9100.0 ft Circulated at 9185.0 ft Circulated at 9163.0 ft · Drilled to 9192.0 ft Circulated at 9192.0 ft Pulled out of hole to 912.7 ft Pulled BHA Made up BHA no. 2 R.I.H. to 9177.0 ft Reamed to 9192.0 ft Drilled to 9264.0 ft Took MWD survey at 9225.0 ft Drilled to 9430.0 ft Drilled to 9521.0 ft Circulated at 9521.0 ft Pulled out of hole to 1093.0 ft Pulled BHA Made up BHA no. 3 R.I.H. to 9408.0 ft Reamed to 9521.0 ft Pulled out of hole to 9100.0 ft Circulated at 9100.0 ft Laid down 256.0 ft of 3-1/2in OD drill pipe R.I.H. to 9200.0 ft Reamed to 9459.0 ft Set tool face Drilled to 9649.0 ft Took MWD survey at 9649.0 ft Circulated at 9649.0 ft Pulled out of hole to 1049.0 ft Pulled BHA Tested BOP stack Made up BHA no. 4 R.I.H. to 8794.0 ft Serviced Block line Circulated at 9163.0 ft R.I.H. to 9286.0 ft Reamed to 9390.0 ft R.I.H. to 9598.0 ft Washed to 9649.0 ft Set tool face Pulled out of hole to 1091.0 ft Pulled BHA Made up BHA no. 5 R.I.H. to 9350.0 ft Reamed to 9488.0 ft R.I.H. to 9598.0 ft Washed to 9649.0 ft Circulated at 9649.0 ft Progress Report Facility PB DS 13 Well 13-02B Rig Doyon 14 Page 3 Date 06 May 98 Date/Time 28 Jan 98 29 Jan 98 30 Jan 98 31 Jan 98 01 Feb 98 02 Feb 98 22:30-01:30 01:30-02:00 02:00-04:00 04:00-06:00 06:00-08:00 08:00-11:00 11:00-14:30 14:30-15:30 15:30-17:00 17:00-21:00 21:00-23:30 23:30-00:30 00:30-01:00 01:00-06:00 06:00-09:30 09:30-12:00 12:00-17:00 17:00-18:00 18:00-19:30 19:30-23:30 23:30-01:00 01:00-02:00 02:00-03:30 03:30-06:00 06:00-19:00 19:00-06:00 06:00-13:00 13:00-17:00 17:00-19:00 19:00-20:30 20:30-01:00 01:00-02:30 02:30-05:00 05:00-06:00 06:00-07:00 07:00-18:00 I8:00-19:00 19:00-22:00 22:00-23:00 23:00-01:00 01:00-02:00 02:00-03:30 03:30-06:00 06:00-07:00 07:00-09:30 09:30-11:00 11:00-12:30 12:30-14:00 14:00-14:15 14:15-14:30 14:30-14:45 14:45-15:00 15:00-15:15 15:!5-15:30 Duration 3 hr 1/2 hr 2 hr 2 hr 2 hr 3 hr 3-1/2 hr 1 hr 1~1/2 hr 4 hr 2-1/2 hr 1 hr 1/2 hr 5 hr 3~ 1/2 hr 2~1/2 hr 5 hr 1 hr 1-1/2 hr 4 hr 1-1/2 hr 1 hr 1-1/2 hr 2-1/2 hr 13 hr 11 hr 7 hr 4 hr 2 hr 1-1/2 hr 4- I/2 hr 1-1/2 hr 2-1/2 hr 1 hr 1 hr llhr I hr 3 hr 1 hr 2 hr 1 hr 1-1/2 hr 2-1/2 hr 1 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr I/4 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr Activity Pulled out of hole to 1089.0 ft Pulled BHA Made up BHA no. 6 R.I.H. to 9163.0 ft R.I.H. to 9630.0 ft Took MWD survey at 9630.0 ft Pulled out of hole to 1092.0 ft Pulled BI-IA Made up BHA no. 7 R.I.H. to 9090.0 ft Circulated at 9090.0 ft R.I.H. to 9374.0 ft Washed to 9649.0 ft Drilled to 9719.0 ft Drilled to 9766.0 ft Circulated at 9735.0 ft Pulled out of hole to 1090.0 ft Pulled BHA Made up BI-IA no. 8 R.I.H. to 9163.0 ft Serviced Block line R.I.H. to 9700.0 ft Washed to 9766.0 ft Drilled to 9795.0 ft Drilled to 9965.0 ft Jarred stuck pipe at 9886.0 ft Jarred stuck pipe at 9836.0 ft Rigged up Logging/braided cable equipment Cut Drillpipe at 9619.0 ft Removed Logging/braided cable equipment Pulled out of hole to 0.0 ft Made up BHA no. 9 R.I.H. to 9163.0 ft Serviced Block line R.I.H. to 9619.0 ft Jarred stuck pipe at 9619.0 ft Rigged up Logging/braided cable equipment Cut Drillpipe at 9619.0 ft Rigged down Logging/braided cable equipment Pulled out of hole to 4500.0 ft Serviced Drillfloor / Derrick Pulled out of hole to 858.0 ft Pulled BHA Pulled BHA R.I.H. to 896.0 ft Serviced Block line R.I.H. to 9619.0 ft Circulated at 9619.0 ft Held safety meeting Rigged up High pressure lines Pumped Water spacers - volume 10.000 bbl Mixed and pumped slurry - 29.300 bbl Pumped Water spacers - volume 3.500 bbl Displaced slurry - 56.000 bbl Facility PB DS 13 Progress Report Well 13-02B Rig Doyon 14 Page Date 4 06 May 98 Date/Time 03 Feb 98 04 Feb 98 15:30-16:00 16:00-18:00 18:00-22:00 22:00-00:00 00:00-00:30 00:30-03:30 03:30-05:30 05:30-06:00 06:00-06:30 06:30-09:30 09:30-11:00 11:00-12:00 12:00-12:30 12:30-16:00 16:00-20:30 20:30-00:00 00:00-05:00 Duration 1/2 hr 2 hr 4 hr 2 hr 1/2 hr 3 hr 2 hr 1/2 hr 1/2 hr 3 hr 1 ~ 1/2 hr 1 hr 1/2 hr 3-1/2 hr 4-1/2 hr 3~ 1/2 hr 5 hr Activity Reverse circulated at 9200.0 ft Pumped out of hole to 9104.0 ft Laid down 4964.0 ft of 3-1/2in OD drill pipe Rigged up Kelly Held safety meeting Laid down 4144.0 ft of 3-1/2in OD drill pipe Worked on BOP - Top ram Worked on BOP - Variable ram Worked on BOP - Top ram Ran Tubing to 3012.0 ft (4-1/2in OD) Space out tubulars Rigged down Kelly Held safety meeting Removed BOP stack Installed HP cap Circulated at 3012.0 ft Serviced Fluid system Progress Report Facility PB DS 13 Well 13-02B Page 1 Rig Doyon 14 Date 06 May 98 Date/Time 17 Mar98 21:00-05:30 18 Mar98 05:30-06:00 06:00-07:00 07:00-11:00 11:00-06:00 19 Mar 98 06:00-09:30 09:30-14:30 14:30-21:00 21:00-22:00 22:00-22:30 22:30-01:00 20 Mar 98 01:00-02:45 02:45-03:30 03:30-05:15 05:15-06:00 06:00-06:15 06:15-10:30 10:30-11:30 11:30-12:00 12:00-13:45 13:45-14:30 14:30-16:00 16:00-21:30 21:30-21:45 21:45-22:30 22:30-23:45 23:45-01:30 21 Mar 98 01:30-06:00 06:00-07:00 07:00-10:00 10:00-10:30 10:30-11:30 11:30-12:00 12:00-13:30 13:30-13:45 13:45-17:00 17:00-18:00 18:00-21:30 21:30-00:00 22 Mar 98 00:00-02:00 02:00-04:15 04:15-06:00 06:00-08:30 08:30-10:00 10:00-18:00 18:00-19:45 19:45-20:00 20:00-23:00 23:00-01:30 23 Mar 98 01:30-03:00 03:00-03:15 03:15-05:30 05:30-06:00 06:00-07:30 Duration 8-1/2 hr 1/2 hr 1 hr 4 hr 19hr 3-1/2 hr 5 hr 6-1/2 hr 1 hr 1/2 hr 2-1/2 hr 1-3/4 hr 3/4 hr 1-3/4 hr 3/4 hr 1/4 hr 4-1/4 hr 1 hr 1/2 hr 1-3/4 hr 3/4 hr 1-1/2 hr 5-1/2 hr 1/4 hr 3/4 hr 1-1/4 hr 1-3/4 hr 4-1/2 hr 1 hr 3 hr 1/2 hr 1 hr 1/2 hr 1-1/2 hr 1/4 hr 3-1/4 hr 1 hr 3-1/2 hr 2-1/2 hr 2 hr 2-1/4 hr 1-3/4 hr 2-1/2 hr 1-1/2 hr 8 hr 1-3/4 hr I/4 hr 3 hr 2-1/2 hr I- 1/2 hr 1/4 hr 2-1/4 hr 1/2 hr 1-1/2 hr Activity Rigged down Drillfloor / Derrick Rig moved 10.00 % Rig moved 20.00 % (cont...) Rig moved 30.00 % Rig moved 85.00 % Rig moved 100.00 % (cont...) Rigged up Drillfloor / Derrick Rigged up BOP stack Rigged up BOP stack Held safety meeting Tested BOP stack Removed Hanger plug Circulated at 3000.0 ft Removed Tubing hanger Circulated at 3000.0 ft Circulated at 3000.0 ft (cont...) Laid down 3000.0 ft of Tubing Serviced Top ram Serviced Kelly Tested BOP stack Serviced Wear bushing Made up BHA no. 10 Singled in drill pipe to 7885.0 ft Held drill (H2S) Singled in drill pipe to 9158.0 ft Washed to 9168.0 ft Circulated at 9268.0 ft Drilled to 9281.0 ft Drilled to 9297.0 ft (cont...) Worked stuck pipe at 9265.0 ft Pulled out of hole to 9126.0 ft Washed to 9134.0 ft Pulled out of hole to 9126.0 ft Circulated at 9126.0 ft Flow check Pulled out of hole to 208.0 ft Pulled BHA Conducted slickline operations on Braided cable equipment - Setting run Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations (cont...) Made up BHA no. 11 R.I.H. to 9050.0 ft Serviced Sand traps . "~." Held safety meeting Circulated at 9026.0 ft Milled Casing at 9057.0 ft Circulated at 9057.0 ft Flow check Pulled out of hole to 271.0 ft Pulled BHA Pulled BHA (cont...) Progress Report Facility PB DS 13 Well 13-02B Rig Doyon 14 Page 2 Date 06 May 98 Date/Time 24 Mar 98 25 Mar 98 26 Mar 98 27 Mar 98 07:30-09:45 09:45-11:00 11:00-12:00 12:00-12:30 12:30-14:00 14:00-15:30 15:30-16:30 16:30-03:15 03:15-05:30 05:30-06:00 06:00-08:00 08:00-08:30 08:30-10:00 10:00-13:00 13:00-15:30 15:30-18:30 18:30-18:45 18:45-20:30 20:30-20:45 20:45-23:30 23:30-00:30 00:30-01:30 01:30-03:00 03:00-03:45 03:45-05:15 05:15-06:00 06:00-06:30 06:30-15:00 15:00-15:30 15:30-19:30 19:30-19:45 19:45-22:15 22:15-22:30 22:30-01:30 01:30-02:30 02:30-02:45 02:45-03:15 03:15-04:00 04:00-04:30 04:30-06:00 06:00-11:00 11:00-13:00 13:00-13:15 13:15-15:00 15:00-15:45 15:45-19:45 19:45-21:00 21:00-22:30 22:30-23:30 23:30-23:45 23:45-04:30 04:30-04:45 04:45-06:00 06:00-07:30 Duration 2-1/4 hr 1-1/4 hr 1 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1 hr 10-3/4 hr 2-1/4 hr 1/2 hr 2 hr 1/2 hr 1-1/2 hr 3 hr 2-1/2 hr 3 hr 1/4 hr 1-3/4 hr 1/4 hr 2-3/4 hr 1 hr 1 hr 1-1/2 hr 3/4 hr 1-1/2 hr 3/4 hr 1/2 hr 8-1/2 hr 1/2 hr 4 hr 1/4 hr 2-1/2 hr 1/4 hr 3 hr 1 hr 1/4 hr 1/2 hr 3/4 hr 1/2 hr 1-1/2 hr 5 hr 2 hr 1/4 hr 1-3/4 hr 3/4 hr 4 hr 1-1/4 hr 1-1/2 hr 1 hr 1/4 hr 4-3/4 hr 1/4 hr 1-1/4 hr 1-1/2 hr Activity Made up BHA no. 12 R.I.H. to 4500.0 ft Serviced Block line Circulated at 4500.0 ft R.I.H. to 9000.0 ft Circulated at 9000.0 ft Reamed to 9057.0 fi Drilled to 9362.0 ft Worked stuck pipe at 9296.0 ft Circulated at 9158.0 ft Circulated at 9126.0 ft (cont...) Pulled out of hole to 9000.0 ft Circulated at 9000.0 ft Reamed to 9234.0 fi Pulled out of hole to 9064.0 ft Reamed to 9140.0 ft Pulled out of hole to 9000.0 ft Circulated at 9000.0 fi Flow check Pulled out of hole to 271.0 ft Pulled BHA Made up BHA no. 13 R.I.H. to 4462.0 ft Circulated at 4462.0 ft R.I.H. to 9026.0 ft Circulated at 9026.0 ft Circulated at 9026.0 ft (cont...) Reamed to 9185.0 fi Pulled out of hole to 9000.0 ft Circulated at 9000.0 ft Flow check Pulled out of hole to 10.0 ft Pulled BHA Ran Drillpipe in stands to 9026.0 fi Circulated at 9026.0 ft Held safety meeting Mixed and pumped slurry - 20.000 bbl Pulled out of hole to 7975.0 fi Reverse circulated at 7975.0 ft Circulated at 7975.0 ft Circulated at 7975.0 ft (cont...) Serviced Trip tank Held safety meeting Circulated at 7975.0 fi Rigged down Kelly Laid down 7975.0 fi of 3-1/2in OD drill pipe Serviced Top ram Serviced Kelly Serviced BOP stack Retrieved Wear bushing Tested BOP stack Installed Wear bushing Conducted electric cable operations Conducted electric cable operations (cont...) Progress Report Facility PB DS 13 Well 13-02B Rig Doyon 14 Page 3 Date 06 May 98 Date/Time 28 Mar 98 29 Mar 98 30 Mar 98 31 Mar 98 01 Apr 98 02 Apr 98 03 Apr 98 07:30-08:00 08:00-09:30 09:30-13:30 13:30-16:00 16:00-17:00 17:00-23:30 23:30-00:00 00:00-01:30 01:30-02:30 02:30-05:00 05:00-06:00 06:00-07:00 07:00-08:00 08:00-10:30 10:30-11:00 11:00-13:00 13:00-14:00 14:00-06:00 06:00-07:45 07:45-08:15 08:15-08:30 08:30-09:15 09:15-10:00 10:00-00:15 00:15-01:00 01:00-01:15 01:15-02:00 02:00-02:30 02:30-06:00 06:00-15:00 15:00-15:45 15:45-16:00 16:00-18:30 18:30-20:00 20:00-22:00 22:00-23:00 23:00-00:00 00:00-00:30 00:30-02:00 02:00-03:00 03:00-06:00 06:00-06:45 06:45-07:00 07:00-07:15 07:15-08:15 08:15-06:00 06:00-06:00 06:00-18:00 18:00-19:00 19:00-19:15 19:15-22:30 22:30-00:00 00:00-00:30 00:30-06:00 Duration 1/2 hr 1-1/2 hr 4 hr 2-1/2 hr 1 hr 6-1/2 hr 1/2 hr 1-1/2 hr 1 hr 2-1/2 hr 1 hr 1 hr 1 hr 2-1/2 hr 1/2 hr 2 hr 1 hr 16 hr 1-3/4 hr 1/2 hr 1/4 hr 3/4 hr 3/4 hr 14-1/4 hr 3/4 hr 1/4 hr 3/4 hr 1/2 hr 3-1/2 hr 9 hr 3/4 hr 1/4 hr 2-1/2 hr 1-1/2 hr 2 hr 1 hr 1 hr 1/2 hr 1-1/2 hr 1 hr 3 hr 3/4 hr 1/4 hr 1/4 hr 1 hr 21-3/4 hr 24 hr 12hr 1 hr 1/4 hr 3-1/4 hr 1-1/2 hr 1/2 hr 5-1/2 hr Activity Tested Bridge plug - Via annulus and string Made up BHA no. 14 Singled in drill pipe to 3423.0 ft Took Gyro survey at 3329.0 ft Circulated at 3419.0 ft Milled Casing at 3457.0 ft Circulated at 3457.0 ft Pulled out of hole to 249.0 ft Pulled BHA Made up BHA no. 15 R.I.H. to 1775.0 ft R.I.H. to 3415.0 ft (cont...) Serviced Block line Took Gyro survey at 3347.0 ft Reamed to 3457.0 ft Drilled to 3526.0 ft Took Gyro survey at 3428.0 ft Drilled to 4668.0 ft Drilled to 4826.0 ft (cont...) Circulated at 4826.0 ft Flow check Pulled out of hole to 3400.0 ft R.I.H. to 4826.0 ft Drilled to 5910.0 ft Circulated at 5910.0 ft Flow check Pulled out of hole to 4625.0 ft R.I.H. to 5910.0 ft Drilled to 6100.0 ft Drilled to 6575.0 ft (cont...) Circulated at 6575.0 ft Flow check Pulled out of hole to 273.0 ft Pulled BHA Made up BHA no. 16 R.I.H. to 3372.0 ft Serviced Block line Circulated at 3372.0 ft Pulled out of hole to 95.0 ft Pulled BHA R.I.H. to 5500.0 ft R.I.H. to 6383.0 ft (cont...) Laid down 180.0 ft of 5in OD drill pipe R.I.H. to 6368.0 ft Reamed to 6575.0 ft Drilled to 7798.0 ft Drilled to 9002.0 ft (cont...) Drilled to 9415.0 ft (cont...) Circulated at 9415.0 ft Flow check Pulled out of hole to 1000.0 ft Pulled BHA Installed Hanger plug Tested BOP stack Progress Report Facility PB DS 13 Well 13-02B Page 4 Rig Doyon 14 Date 06 May 98 Date/Time 04 Apr 98 05 Apr 98 06 Apr 98 06:00-09:30 09:30-09:45 09:45-10:00 10:00-12:00 12:00-13:30 13:30-14:30 14:30-17:00 17:00-17:30 17:30-18:00 18:00-06:00 06:00-12:30 12:30-13:45 13:45-14:00 14:00-14:15 14:15-17:45 17:45-19:30 19:30-20:00 20:00-21:15 21:15-21:30 21:30-02:00 02:00-03:00 03:00-03:30 03:30-06:00 06:00-09:00 09:00-09:30 09:30-10:30 10:30-13:15 13:15-13:30 13:30-13:45 13:45-14:15 14:15-15:00 15:00-15:15 15:15-18:00 18:00-18:15 18:15-18:30 18:30-18:45 18:45-19:00 19:00-19:45 19:45-22:45 22:45-23:00 23:00-01:00 01:00-02:00 02:00-02:30 02:30-04:00 04:00-06:00 06:00-07:15 07:15-09:00 09:00-09:45 09:45-15:45 15:45-17:00 17:00-21:45 21:45-22:00 22:00-22:30 22:30-22:45 Duration 3-1/2 hr I/4 hr 1/4 hr 2 hr 1-1/2 hr 1 hr 2-1/2 hr 1/2 hr I/2 hr 12hr 6-1/2 hr 1- I/4 hr 1/4 hr 1/4 hr 3-1/2 hr 1-3/4 hr 1/2 hr 1-1/4 hr 1/4 hr 4-1/2 hr 1 hr I/2 hr 2-1/2 hr 3 hr 1/2 hr 1 hr 2-3/4 hr 1/4 hr 1/4 hr 1/2 hr 3/4 hr 1/4 hr 2-3/4 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr 3/4 hr 3 hr 1/4 hr 2 hr 1 hr 1/2 hr 1-1/2 hr 2 hr 1-1/4 hr 1-3/4 hr 3/4 hr 6 hr 1-1/4 hr 4-3/4 hr 1/4 hr 1/2 hr 1/4 hr Activity Tested BOP stack (cont...) Retrieved Hanger plug Installed Wear bushing Made up BHA no. 17 R.I.H. to 3364.0 ft Serviced Block line R.I.H. to 9331.0 ft Reamed to 9415.0 ft Took MWD survey at 9376.0 ft Drilled to 9787.0 ft Drilled to 10036.0 fi (cont...) Circulated at 10036.0 ft Flow check Circulated at 10036.0 ft Pulled out of hole to 1000.0 ft Pulled BHA Rigged up High pressure lines Rigged up Casing handling equipment Held safety meeting Ran Liner to 3400.0 ft (7in OD) Circulated at 3400.0 ft Circulated at 3400.0 ft Ran Liner to 7in (5330.0 ft OD) Ran Liner to 8941.0 ft (7in OD) (cont...) Serviced Liner hanger Ran Liner on landing string to 10036.0 ft Circulated at 10036.0 ft Held safety meeting Pumped Brine spacers - volume 20.000 bbl Pumped Lo/Hi vis combination spacers - volume 70.000 bbl Held safety meeting Circulated at 10036.0 ft Circulated at 10036.0 ft Held safety meeting Pumped Brine spacers - volume 20.000 bbl Pumped Water based mud spacers - volume 70.000 bbl Batch mixed slurry - 40.000 bbl Displaced slurry - 359.000 bbl Wait on cement Functioned Liner hanger Freeze protect well - 0.000 bbl of Diesel Functioned Liner hanger Circulated at 1073.0 ft Investigated pressure change Laid down 100013.0 ft of 5in OD drill pipe Laid down 10000.0 ft of 5in OD drill pipe (cont...) Laid down 1070.0 ft of 5in OD drill pipe Tested Liner hanger - Via annulus Laid down 10000.0 ft of 5in OD drill pipe Serviced Pipe ram Serviced Annular preventor Retrieved Wear bushing Serviced BOP stack Held safety meeting Progress Report Facility PB DS 13 Well 13-02B Page 5 Rig Doyon 14 Date 06 May 98 Date/Time 07 Apr 98 08 Apr 98 09 Apr 98 10 Apr 98 11 Apr 98 12 Apr 98 13 Apr 98 14 Apr 98 22:45-23:15 23:15-00:00 00:00-00:15 00:15-01:00 01:00-06:00 06:00-07:30 07:30-08:30 08:30-09:15 09:15-12:00 12:00-12:15 12:15-13:15 13:15-13:30 13:30-13:45 13:45-16:00 16:00-16:30 16:30-18:00 18:00-18:15 18:15-22:00 22:00-23:00 23:00-00:00 00:00-06:00 06:00-07:30 07:30-07:45 07:45-11:00 11:00-12:00 12:00-13:15 13:15-16:30 16:30-17:30 17:30-18:45 18:45-19:15 19:15-06:00 06:00-06:00 06:00-22:00 22:00-23:00 23:00-23:15 23:15-02:45 02:45-03:15 03:15-04:00 04:00-06:00 06:00-08:30 08:30-09:30 09:30-13:30 13:30-14:30 14:30-06:00 06:00-06:00 06:00-13:00 13:00-14:00 14:00-21:30 21:30-22:30 22:30-22:45 22:45-23:00 23:00-23:15 23:15-06:00 06:00-12:00 Duration 1/2 hr 3/4 hr 1/4 hr 3/4 hr 5 hr 1-1/2 hr 1 hr 3/4 hr 2-3/4 hr 1/4 hr 1 hr 1/4 hr 1/4 hr 2-1/4 hr 1/2 hr 1-1/2 hr 1/4 hr 3-3/4 hr 1 hr 1 hr 6 hr 1-1/2 hr 1/4 hr 3-1/4 hr 1 hr 1-1/4 hr 3-1/4 hr 1 hr 1-1/4 hr 1/2 hr 10-3/4 hr 24 hr 16hr 1 hr 1/4 hr 3-1/2 hr 1/2 hr 3/4 hr 2 hr 2-1/2 hr 1 hr 4 hr 1 hr 15-1/2 hr 24 hr 7 hr 1 hr 7-1/2 hr 1 hr 1/4 hr 1/4 hr 1/4 hr 6-3/4 hr 6 hr Activity Tested BOP stack Installed Wear bushing Held safety meeting Made up BHA no. 18 Singled in drill pipe to 4100.0 ft Singled in drill pipe to 8800.0 ft (cont...) Serviced Block line Singled in drill pipe to 9868.0 ft Drilled cement to 10036.0 ft Drilled to 10040.0 ft Circulated at 10040.0 ft Flow check Circulated at 10040.0 ft Pulled out of hole to 1047.0 ft Pulled BHA Made up BHA no. 19 Held safety meeting R.I.H. to 10000.0 ft Logged hole with LWD: DIR/DD from 10000.0 ft to 10040.0 ft Drilled to 10058.0 ft Drilled to 10170.0 ft Drilled to 10190.0 ft (cont...) Flow check Pulled out of hole to 1045.0 ft Pulled BHA Made up BHA no. 20 R.I.H. to 9990.0 ft Serviced Block line Drilled to 10197.0 ft Logged hole with LWD: DIR/DD from 10152.0 ft to 10197.0 ft Drilled to 10340.0 ft Drilled to 10609.0 ft (cont...) Drilled to 10832.0 ft (cont...) Circulated at 10832.0 ft Flow check Pulled out of hole to 200.0 ft Pulled BHA Made up BHA no. 21 Tested BOP stack Tested BOP stack (cont...) Made up BHA no. 21 R.I.H. to 10832.0 ft R.I.H. to 10832.0 ft Drilled to 11122.0 ft Drilled to 11792.0 ft (cont...) Drilled to 11922.0 ft (cont...) Tested Survey instruments - Via string Drilled to 12015.0 ft Circulated at 12015.0 ft Flow check Pulled out of hole to 11588.0 ft Worked stuck pipe at 11492.0 ft Worked stuck pipe at 11502.0 ft Worked stuck pipe at t 1502.0 ft (cont...) Progress Report Facility PB DS 13 Well 13-02B Rig Doyon 14 Page 6 Date 06 May 98 Date/Time 15 Apr 98 16 Apr 98 17 Apr 98 18 Apr 98 12:00-21:00 21:00-21:30 21:30-22:00 22:00-00:00 00:00-00:30 00:30-01:00 01:00-02:00 02:00-02:15 02:15-03:30 03:30-06:00 06:00-08:00 08:00-09:00 09:00-09:30 09:30-10:00 10:00-10:30 10:30-15:00 15:00-15:30 15:30-17:00 17:00-17:15 17:15-18:00 18:00-18:15 18:15-19:30 19:30-19:45 19:45-23:00 23:00-23:30 23:30-03:15 03:15-03:30 03:30-05:00 05:00-06:00 06:00-06:15 06:15-07:00 07:00-07:30 07:30-12:15 12:15-12:45 12:45-15:30 15:30-18:30 18:30-20:30 20:30-20:45 20:45-23:45 23:45-00:00 00:00-00:15 00:15-04:30 04:30-05:00 05:00-06:00 06:00-06:45 06:45-09:30 09:30-10:30 10:30-11:00 11:00-12:00 12:00-06:00 06:00-16:00 16:00-16:15 16:15-20:30 20:30-21:15 Duration 9 hr 1/2 hr I/2 hr 2 hr 1/2 hr 1/2 hr 1 hr 1/4 hr 1-1/4 hr 2-1/2 hr 2 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 1/2 hr 1-1/2 hr 1/4 hr 3/4 hr 1/4 hr 1-1/4 hr 1/4 hr 3-1/4 hr 1/2 hr 3-3/4 hr 1/4 hr 1-1/2 hr 1 hr 1/4 hr 3/4 hr 1/2 hr 4-3/4 hr 1/2 hr 2-3/4 hr 3 hr 2 hr 1/4 hr 3 hr 1/4 hr 1/4 hr 4-1/4 hr 1/2 hr 1 hr 3/4 hr 2-3/4 hr I hr 1/2 hr 1 hr 18 hr 10 hr 1/4 hr 4-1/4 hr 3/4 hr Activity Worked stuck pipe at 11502.0 ft Held safety meeting Installed Logging/braided cable equipment Functioned Fishing tools Functioned Fishing tools Circulated at 11502.0 ft Functioned Fishing tools Cut Drillpipe at 11300.0 ft Removed Wireline units Pulled out of hole to 11300.0 ft Pulled out of hole to -0.0 ft (cont...) Serviced Block line Made up BI-IA no. 22 Pulled BI-IA Made up BHA no. 23 R.I.H. to 11103.0 ft Reamed to 11146.0 ft Circulated at 11146.0 ft Flow check Pulled out of hole to 9985.0 ft R.I.H. to 11146.0 ft Circulated at 11146.0 ft Flow check Pulled out of hole to 25.0 ft Pulled BHA Ran Drillpipe in stands to 11146.0 ft Held safety meeting Circulated at 11146.0 ft Displaced slurry - 22.000 bbl Displaced slurry - 22.000 bbl (cont...) Pulled Drillpipe in stands to 10447.0 ft Circulated at 10447.0 ft Pulled Drillpipe in stands to -0.0 ft Made up BHA no. 23 R.I.H. to 10450.0 ft Drilled cement to 10628.0 ft Circulated at 10628.0 ft Flow check Pulled out of hole to 35.0 ft Pulled BI-LA Retrieved Wear bushing Tested BOP stack Installed Wear bushing Made up BHA no. 24 Made up BHA no. 24 (cont...) R.I.H. to 9963.0 ft Serviced Block line R.I.H. to 10579.0 ft Reamed to 10628.0 ft Drilled to 10770.0 ft Drilled to 10806.0 ft (cont...) Flow check Pulled out of hole to 90.0 ft Pulled BHA Facility i PB DS 13 Progress Report Well 13-02B Rig Doyon 14 Page 7 Date 06 May 98 Date/Time 19 Apr 98 20 Apr 98 21 Apr 98 22 Apr 98 23 Apr 98 24 Apr 98 25 Apr 98 26 Apr 98 21:15-22:00 22:00-02:00 02:00-02:45 02:45-06:00 06:00-06:00 06:00-14:30 14:30-16:30 16:30-16:45 16:45-20:30 20:30-21:15 21:15-22:15 22:15-02:45 02:45-06:00 06:00-06:00 06:00-16:30 16:30-18:30 18:30-18:45 18:45-19:30 19:30-19:45 19:45-20:30 20:30-21:15 21:15-06:00 06:00-13:30 13:30-15:30 15:30-15:45 15:45-20:15 20:15-21:00 21:00-21:15 21:15-01:15 01:15-01:30 01:30-03:00 03:00-06:00 06:00-08:30 08:30-09:00 09:00-06:00 06:00-07:15 07:15-09:30 09:30-09:45 09:45-10:30 10:30-11:15 11:15-12:30 12:30-13:30 13:30-16:00 16:00-21:00 21:00-22:30 22:30-00:30 00:30-00:45 00:45-06:00 06:00-06:45 06:45-07:45 07:45-11:00 11:00-12:00 12:00-13:45 13:45-17:00 Duration 3/4 hr 4 hr 3/4 hr 3-1/4 hr 24 hr 8-1/2 hr 2 hr 1/4 hr 3-3/4 hr 3/4 hr 1 hr 4-1/2 hr 3-1/4 hr 24 hr 10-1/2 hr 2 hr 1/4 hr 3/4 hr 1/4 hr 3/4 hr 3/4 hr 8-3/4 hr 7-1/2 hr 2 hr 1/4 hr 4-1/2 hr 3/4 hr 1/4 hr 4 hr 1/4 hr 1-1/2 hr 3 hr 2-1/2 hr 1/2 hr 21hr 1-1/4 hr 2-1/4 hr 1/4 hr 3/4 hr 3/4 hr 1-1/4 hr 1 hr 2-1/2 hr 5 hr 1-1/2 hr 2 hr 1/4 hr 5-1/4 hr 3/4 hr 1 hr 3-1/4 hr 1 hr 1-3/4 hr 3-1/4 hr Activity Made up BHA no. 25 R.I.H. to 10806.0 ft Circulated at 10806.0 ft Drilled to 10817.0 ft Drilled to 11091.0 ft (cont...) Drilled to 11235.0 ft (cont...) Circulated at 11235.0 ft Flow check Pulled out of hole to 65.0 ft Pulled BHA Made up BHA no. 26 R.I.H. to 11235.0 ft Drilled to 11270.0 ft Drilled to 11759.0 ft (cont...) Drilled to 12046.0 ft (cont...) Circulated at 12046.0 ft Flow check Pulled out of hole to 9992.0 ft Flow check Serviced Block line R.I.H. to 12046.0 ft Drilled to 12315.0 ft Drilled to 12438.0 ft (cont...) Circulated at 12438.0 ft Flow check Pulled out of hole to 180.0 ft Pulled BHA Retrieved Wear bushing Tested BOP stack Installed Wear bushing Made up BHA no. 27 R.I.H. to 8856.0 ft R.I.H. to 12394.0 ft (cont...) Washed to 10438.0 ft Drilled to 12981.0 ft Drilled to 13045.0 ft (cont...) Circulated at 13045.0 ft Flow check Pulled out of hole to 11340.0 ft R.I.H. to 13045.0 ft Drilled to 13077.0 ft Worked stuck pipe at 13032.0 ft Circulated at 13045.0 ft Drilled to 13182.0 ft Circulated at 13182.0 ft Circulated at 13182.0 ft Flow check Pulled out of hole to 180.0 ft Pulled BHA Made up BHA no. 28 R.I.H. to 9965.0 ft Serviced Block line .:i:? :~.~ ::~. (i'!' i:: :~'~; (17:.:::~ 'i;~:. :~ ~;':'.i~.:;i R.I.H. to 13032.0 ft .::~,: .::-'c :':~'i~ Logged hole with LWD: DIR/FE from 13032.0 ft to 13182.0 ft Facility PB DS 13 Progress Report Well 13-02B Page 8 Rig Doyon 14 Date 06 May 98 Date/Time 17:00-06:00 27 Apr 98 06:00-22:30 22:30-00:30 28 Apr 98 00:30-00:45 00:45-02:30 02:30-02:45 02:45-04:30 04:30-06:00 06:00-13:30 13:30-15:30 15:30-15:45 15:45-17:30 17:30-17:45 17:45-18:00 18:00-18:45 18:45-20:15 20:15-23:15 23:15-23:30 23:30-05:15 29 Apr 98 05:15-06:00 06:00-07:00 07:00-08:00 08:00-08:15 08:15-12:00 12:00-12:30 12:30-15:30 15:30-15:45 15:45-17:30 17:30-19:00 19:00-19:45 19:45-20:00 20:00-20:30 20:30-21:30 21:30-23:00 23:00-23:15 23:15-02:30 30 Apr 98 02:30-03:30 03:30-04:00 04:00-06:00 06:00-08:30 08:30-09:00 09:00-09:15 09:15-10:00 10:00-16:30 16:30-17:30 17:30-18:00 18:00-18:15 18:15-21:30 21:30-23:00 23:00-02:00 01 May 98 02:00-03:00 03:00-04:00 04:00-04:30 04:30-06:00 Duration 13hr 16-1/2 hr 2 hr 1/4 hr 1-3/4 hr 1/4 hr 1-3/4 hr 1-1/2 hr 7-1/2 hr 2hr 1/4 hr 1-3/4 hr 1/4 hr 1/4 hr 3/4 hr l-l/2 hr 3hr 1/4 hr 5-314 hr 3/4 hr lhr lhr 1/4 hr 3-3~4 hr 1/2 hr 3hr l/4hr 1-3/4 hr 1-1/2 hr 3/4 hr l/4hr 112 hr lhr 1-1/2 hr 1/4 hr 3-1/4 hr lhr 1/2hr 2hr 2-1/2 hr 1/2 hr 1/4 hr 3/4 hr 6-1/2 hr lhr 1/2 hr 1/4 hr 3-1/4 hr 1-1/2 hr 3 hr 1 hr 1 hr 1/2 hr 1-1/2 hr Activity Drilled to 13521.0 ft Drilled to 13840.0 ft (cont...) Circulated at 13840.0 ft Flow check Pulled out of hole to 9972.0 ft Flow check R.I.H. to 13840.0 ft Drilled to 13872.0 ft Drilled to 14050.0 ft (cont...) Circulated at 14050.0 ft Flow check Pulled out of hole to 9912.0 ft Flow check R.I.H. to 10492.0 ft Reamed to 10620.0 ft R.I.H. to 14050.0 ft Circulated at 14050.0 ft Flow check Pulled out of hole to 214.0 ft Pulled BHA Pulled BHA (cont...) Installed Casing handling equipment Held safety meeting Ran Liner to 4163.0 ft (4-1/2in OD) Serviced Liner hanger Ran Liner on landing string to 10036.0 ft Circulated at 10036.0 ft Ran Liner on landing string to 13148.0 ft Worked stuck pipe at 13148.0 ft Circulated at 13148.0 ft Functioned Liner hanger Tested Tie back packer - Via annulus Functioned Liner hanger Circulated at 13148.0 ft Flow check Laid down 5480.0 ft of 3-1/2in OD drill pipe Ran Drillpipe on landing string to 6900.0 ft Removed High pressure lines Laid down 6900.0 ft of 3-1/2in OD drill pipe Laid down 6900.0 ft of 3-1/2in OD drill pipe (cont...) Retrieved Wear bushing Held safety meeting Rigged up Completion string handling equipment Ran Tubing to 6963.0 ft (4-1/2in OD) Functioned SCSSSV nipple assembly Ran Tubing to 8000.0 ft (4-1/2in OD) Held safety meeting Ran Tubing to 9021.0 ft (4-1/2in OD) Installed Tubing hanger Circulated at 9019.0 ft Functioned Production packer Tested Tubing Rigged down High pressure lines Conducted slickline operations on Slickline equipment - Retrival run Facility PB DS 13 Progress Report Well 13-02B Page 9 Rig Doyon 14 Date 06 May 98 Date/Time 06:00-14:00 14:00-15:15 15:15-16:00 16:00-18:00 18:00-19:30 19:30-20:00 20:00-20:15 20:15-21:30 21:30-22:00 22:00-22:30 22:30-23:45 23:45-01:00 02 May 98 01:00-02:00 Duration 8 hr 1-1/4 hr 3/4 hr 2 hr 1-1/2 hr 1/2 hr 1/4 hr 1-1/4 hr 1/2 hr 1/2 hr 1-1/4 hr 1-1/4 hr 1 hr Activity Conducted slickline operations on Slickline equipment - Retrival run (co: Functioned Completion tools Installed Hanger plug Rigged down BOP stack Installed Tubing bonnet Tested Tubing bonnet Serviced Xmas tree integral components Installed Hanger plug Tested Xmas tree Retrieved Hanger plug Freeze protect well - 110.000 bbl of Diesel Circulated at 3597.0 ft Installed Hanger plug q~ALASKAO ,eared rvioes rilling BP Exploration / Arco To: Alaska Oil & Gas Conservation Commission Date: June 3, 1998 From: Subject: Terrie Hubble Technical Assistant Permit To Drill ¢/97-253, 13-02B The location of this well at total depth was listed incorrectly on the original Permit To Drill. This was discovered while computing the bottom hole location for the Completion Report. Originally Permitted (Incorrectly) Location of well at total depth 4570' NSL, 3869' WEL, SEC. 13, T10N, R14E Should Have Been Permitted Location of well at total depth 4570' NSL, 3869' WEL, SEC. 18, T10N, R15E (or 1193' EWL) This information was listed correctly under Global and Local Coordinates on the directional attachments to the Permit to Drill, but not translated correctly. Additionally because the section was incorrect the ADL changed as well. I apologize for any inconvenience this may have caused. Please let me know if there are any further action required. Thank you for your assistance and patience in this matter. /tlh SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE i SHARED SERVICES DRiLLiNG PBU \ 13-02BPB1 500292032470 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/25/98 DATE OF SURVEY: 013098 MWD SURVEY JOB NUMBER: AKMW80094 KELLY BUSHING ELEV. = 75.50 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 9089.50 8352.24 8276.74 42 30 N 56.00 E .00 1995.96N 1439.55E 1598.26 9168.00 8410.37 8334.87 41 56 N 56.01 E .71 2025.45N 1483.28E 1644.26 9179.04 8418.42 8342.92 44 32 N 58.09 E 26.85 2029.56N 1489.63E 1650.92 9211.77 8441.37 8365.87 46 25 N 62.07 E 10.42 2041.19N 1509.86E 1672.03 9242.97 8462.28 8386.78 49 22 N 65.54 E 12.55 2051.39N 1530.63E 1693.57 9274.95 8482.36 8406.86 52 50 N 68.81 E 13.43 2061.03N 1553.57E 1717.22 9307.12 8501.12 8425.62 55 48 N 71.86 E 12.02 2069.80N 1578.18E 1742.47 9340.43 8519.59 8444.09 56 51 N 74.79 E 7.97 2077.75N 1604.73E 1769.58 9372.88 8537.03 8461.53 58 7 N 75.92 E 4.87 2084.67N 1631.20E 1796.53 9405.25 8553.83 8478.33 59 20 N 72.79 E 9.10 2092.13N t657.84E 1823.69 9437.37 8569.73 8494.23 61 19 N 73.43 E 6.37 2100.24N 1684.54E 1850.97 9469.50 8584.77 8509.27 62 49 N 74.14 E 5.09 2108.17N 1711.80E 1878.78 9501.68 8599.14 8523.64 64 9 N 70.89 E 9.94 2116.82N 1739.26E 1906.86 9533.29 8612.98 8537.48 63 54 N 68.19 E 7.72 2126.75N 1765.88E 1934.20 9565.65 8627.70 8552.20 62 0 N 65.21 E 10.09 2138.14N 1792.34E 1961.51 9596.57 8642.48 8566.98 60 52 N 62.06 E 9.66 2150.20N 1816.67E 1986.75 9628.06 8658.03 8582.53 59 58 N 59.45 E 7.74 2163.57N 1840.56E 2011.65 9660.40 8672.84 8597.34 65 28 N 56.28 E 19.08 2178.87N 1864.88E 2037.14 9696.71 8685.66 8610.16 73 9 N 54.54 E 21.62 2198.15N 1892.81E 2066.56 9730.53 8693.02 8617.52 81 41 N 52.21 E 26.16 2217.83N 1919.27E 2094.54 9763.27 8695.65 8620.15 89 4 N 49.84 E 23.67 2238.34N 1944.62E 2121.49 9794.58 8694.16 8618.66 96 22 N 45.99 E 26.35 2259.28N 1967.81E 2146.32 9822.82 8690.40 8614.90 98 56 N 46.31 E 9.13 2278.67N 1988.00E 2168.02 9855.20 8685.84 8610.34 97 13 N 47.73' E 6.84 2300.52N 2011.44E 2193.18 9887.11 8682.65 8607.15 94 15 N 48.55 E 9.68 2321.71N 2035.09E 2218.48 9965.00 8676.88 8601.38 94 15 N 48.55 E .00 2373.12N 2093.31E 2280.72 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 3164.44 FEET AT NORTH 41 DEG. 24 MIN. EAST AT MD = 9965 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 85.30 DEG. TIE-IN SURVEY AT 9,089.50' MD WINDOW POINT AT 9, 168.00' MD PROJECTED SURVEY AT 9, 965.00' MD SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU \ 13-02BPB1 500292032470 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/25/98 DATE OF SURVEY: 013098 JOB NUMBER: AKMW80094 KELLY BUSHING ELEV. = 75.50 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9089.50 8352.24 8276.74 9965.00 8676.88 8601.38 1995.96 N 1439.55 E 737.26 2373.12 N 2093.31 E 1288.12 550.86 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU \ i3-02BPB! 500292032470 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/25/98 DATE OF SURVEY: 013098 JOB NUMBER: A_~w~W80094 KELLY BUSHING ELEV. = 75.50 FT. OPERATOR: ARCO ALASKA INC iNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9089.50 8352.24 8276.74 9121.04 8375.50 8300.00 9263.84 8475.50 8400.00 9449.40 8575.50 8500.00 1995.96 N 1439.55 E 737.26 2007.88 N 1457.22 E 745.54 8.29 2057.74 N 1545.48 E 788.34 42.80 2103.25 N 1694.66 E 873.90 85.56 9667.14 8675.50 8600.00 9689.50 8683.48 8607.98 2182.34 N 1870.01 E 991.64 117.74 2194.18 N 1887.20 E 1006.02 14.38 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS ,Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 13 ~3.02B PB2 ORi{ INAL SURVEY REPORT 2 June, 1998 Your Ref: AP1-500292032471 Last Survey 24-March-98 Job# A KMWS0166 KBE- 78.05' Surface Coordinates: 5932237.63 N, 687178.80 E (70° 13' 11.1058" N, spm~~-s~m DRILLING 5ERVIr'ES .~. DI'~ON OF DR~F_.R I~Dtl.qL'T~lrt,~ 211° 30' 36.6093" E) Survey Ref: svy3465 Sperry-Sun Drilling Services Survey Report for '13.02B PB2 Your Ref: API-500292032471 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 8992.05 41.750 53.000 8202.38 8280.43 1935.89 N 1394.70 E 9026.00 41.970 53.940 8227.66 8305.71 1949.37 N 1412.91 E 9058.21 46.900 54.090 8250.66 8328.71 1962.62 N 1431.15 E 9088.93 51.140 54.220 8270.80 8348.85 1976.20 N 1449.95 E 9120.71 55.960 54.330 8289.67 8367.72 1991.12 N 1470.69 E 9152.52 60.600 54,440 8306.39 8384.44 2006.87 N 1492,68 E 9184.31 66.050 55,420 8320.66 8398.71 2023.18 N 1515.93 E 9216.23 69.840 57.850 8332.64 8410.69 2039.44 N 1540.63 E 9248.11 72.380 56.280 8342.97 8421.02 2055.84 N 1565.94 E 9279.86 73.580 51,360 8352.26 8430.31 2073.76 N 1590.44 E 9362.00 73.580 51.360 8375.48 8453.53 2122.96 N 1651.98 E All data is in feet unless otherwise stated. Directions and coordinates are relative to Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 37.888° (True). ,' "Based upon Minimum Curvature type calculations, at a Measured Depth of 9362.00ft., The Bottom Hole Displacement is 2689.98ft., in the Direction of 37.888° (True). Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/lOOft) (ft) 5934207.51 N 688525.06 E 2384.34 5934221.45 N 688542.93 E 1.958 2406.17 5934235.14 N 688560.84 E 15.309 2427.82 5934249.18 N 688579.29 E 13.806 2450.08 5934264,61 N 688599.66 E 15.169 2474.60 5934280,90 N 688621.25 E 14.590 2500.53 5934297,78 N 688644.09 E 17.363 2527.68 5934314.65 N 688668.38 E 13.811 2555.68 5934331,67 N 688693.28 E 9.230 2584.17 5934350,19 N 688717.32 E 15.291 2613.36 5934400.90 N 688777.62 E 0.000 2689.98 True North. Comment Tie-on Survey Window Point Projected Survey Alaska State Plane Zone 4 PBU EOADS13 Continued... 2 June, 1998 - 15:44 - 2 - DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 13-02B PB2 Your Ref: API-500292032471 Alaska State Plane Zone 4 PBU EOA DS 13 Comments Measured Depth 8992.05 9026.00 9362.00 Station Coordinates TVD Nothings Eastings (fi) (fi) (fi) 8280.43 1935.89 N 1394.70 E 8305.71 1949.37 N 1412.91 E 8453.53 2122.96 N 1651.98 E Comment Tie-on Survey Window Point Projected Survey 2 June, 1998 - 15:44 - 3 - DrillQuest Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 13 13-02B PB3 ORIGt, NAL SURVEY REPORT 2 June, 1998 Your Reft API-500292032472 Last Survey 14-April-98 Job# AKMW80166 KBE- 78.05' Surface Coordinates: 5932237.~j~~~~~l.lO58" N, 211° 30' 36.6093"E) DRILLING =~E RVl C:E =; A DI%~ION OF DR~B INDU~I~ INC. JUIt 1 9 19 Alaska Oii& Gas CoDs. ¢ommissioD .~chorage Survey Reft svy2783 Prudhoe Bay Unit Measured Depth Incl. Azim. 3410.00 0.790 79.040 3418.00 1.076 77.387 3534.57 5.250 53.300 3565.20 6.280 53.110 3662.40 8.470 38.390 3757.16 10.450 36.260 3851.87 12.310 37.590 3947.06 14.190 37.650 4042.29 16.660 40.890 4137.47 17.850 36.200 4232.69 19.210 37.820 4328.49 21.460 37.990 4425.68 23.740 37.460 4519.95 26.600 36.720 4614.57 28.700 37.580 4709.11 32.370 38.400 4805.07 34.950 41.680 4901.20 36.710 40.790 4995.95 36.270 40.570 5091.67 38.380 41.820 5186.64 39.840 41.440 5282.37 39.930 39.880 5377.92 39.690 39.240 5473.81 39.820 38.670 5569.94 40.950 41.240 5664.14 40.350 41.770 5760.14 40.240 44.020 5853.69 38.870 44.150 5951.00 38.930 45.680 6045.77 39.430 44,720 Sub-Sea Depth (ft) 3331.80 3339.80 3456.17 3486.64 · 3583.04 3676.51 3769.35 3862.01 3953.80 4044.70 4134.98 4224.80 4314.53 4399.84 4483.65 4565.06 4644.93 4722.87 4799.04 4875.16 4948.85 5022.31 5O95.7O 5169.42 5242.65 5314.12 5387.35 5459.47 5535.20 5608.67 Vertical Depth (ft) 34O9.85 3417.85 3534.22 3564.69 3661.09 3754.56 3847.40 394O.O6 4031.85 4122.75 4213.03 43O2.85 4392.58 4477.89 4561.70 4643.11 4722.98 4800.92 4877.09 4953.21 5026.90 5100.36 5173.75 5247.47 5320.70 5392.17 5465.40 5537.52 5613.25 5686.72 Sperry-Sun Drilling Services Survey Report for 13-02B PB3 Your Ref: API-500292032472 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 23.65 S 8.27 E 5932214.19 N 687187.65 E -0.44 23.63 S 8.39 E 5932214.22 N 687187.78 E 3.596' -0.31 20.20 S 13.74 E 5932217.78 N 687193.04 E 3.680 5.89 18.35 S 16.21 E 5932219.68 N 687195.46 E 3.363 8.84 9.55 S 24.90 E 5932228.70 N 687203.93 E 2.958 20.05 2.85 N 34.32 E 5932241.33 N 687213.04 E 2.122 33.18 17.78 N 45,56 E 5932256.53 N 687223.91 E 1.983 48.90 35.06 N 58.88 E 5932274.14 N 687236.79 E 1.975 67.38 54.62 N 74.95 E 5932294.09 N 687252.37 E 2.746 89.23 76.71 N 92.50 E 5932316.61 N 687269.37 E 1.922 113.35 100.86 N 110.72 E 5932341.21 N 687286.99 E 1.527 138.82 127,13 N 131.18 E 5932367.97 N 687306.78 E 2.349 167.11 156.67 N 154.02 E 5932398.07 N 687328.89 E 2.355 198.78 188.66 N 178.19 E 5932430.65 N 687352.25 E 3.052 232.53 223.65 N 204.71 E 5932466.29 N 687377.90 E 2.259 269.54 261.48 N 234.28 E 5932504.84 N 687406.53 E 3.907 310.39 302.15 N 268.53 E 5932546.35 N 687439.75 E 3.288 356.61 344.47 N 305.61E 5932589.58 N 687475.77 E 1.909 406.06 387.21 N 342.34 E 5932633.21 N 687511,43 E 0.484 455.32 430.86 N 380.57 E 5932677.80 N 687548.57 E 2.342 506.32 475.64 N 420.37 E 5932723.55 N 687587.24 E 1,558 559.17 522.21 N 460.36 E 5932771.09 N 687626,07 E 1.049 612.82 569.37 N 499.32 E 5932819.21 N 687663.85 E 0.497 665.72 617.06 N 537.87 E 5932867.84 N 687701.21 E 0.404 718.41 664.78 N 577.88 E 5932916.54 N 687740.01E 2.093 772.47 710.74 N 618.54 E 5932963.49 N 687779.53 E 0.735 826.55 756.22 N 660.79 E 5933010.00 N 687820.64 E 1.520 881.94 799.01 N 702,24 E 5933053,81 N 687861.01 E 1.467 935.65 842.28 N 745.38 E 5933098.13 N 687903.06 E 0.989 991.12 884.47 N 787.86 E 5933141.36 N 687944,48 E 0.829 1045.59 Comment Tie-on Survey Window point Alaska State Plane Zone 4 PBU EOA DS 13 Continued... 2 June, 1998 - 16:11 - 2 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl, Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 6142.10 40.300 41.900 5682.61 5760.66 6236.57 40.250 39.920 5754.69 5832.74 6331.32 40.400 37.710 5826.93 5904.98 6426.66 39.500 39,020 5900.02 5978.07 6517.88 39,480 38,940 5970.42 6048.47 6593.87 39.670 37.750 6028.99 6107.04 6689.46 39.840 37.000 6102.48 6180.53 6785.07 39,710 40.460 6175.97 6254.02 6879.96 39.400 39.370 6249.13 6327.18 6975.01 40.050 37.950 6322.24 6400.29 7069.89 39.520 38.490 6395.15 6473.20 7164.65 39,260 41.400 6468.39 6546.44 7259.26 39.600 41.530 6541.47 6619.52 7354.02 39,250 41.350 6614.66 6692.71 7449.37 38.730 40,100 6688.78 6766.83 7544.86 38.370 39.800 6763.46 6841.51 7639.99 38.220 37.870 6838.12 6916.17 7733.58 38.710 40.240 6911.40 6989.45 7828.67 38.390 39.670 6985.77 7063.82 7923.92 37.640 39.420 7060.81 7138.86 8019.03 37.080 38,990 7136.41 7214.46 8114.17 37.830 39.900 7211.93 7289.98 8210.29 37.400 41.740 7288.08 7366.13 8306.10 38.060 41.460 7363.85 7441.90 8401.20 37.560 41.160 7438.99 7517.04 8497.00 38.100 40.140 7514.65 7592.70 8591.68 36.880 39.180 7589.78 7667.83 8686.54 38.360 39.370 7664.91 7742.96 8781.39 37.530 36.320 7739.72 7817.77 8876.56 38.650 37.880 7814.62 7892.67 Survey Report for 13-02B PB3 Your Ref: API-500292032472 929.39 N 830.20 E 975.54 N 870.19 E 1023.31N 908.61E 1071.31 N 946.60 E 1116.41 N 983.09 E 1154.38 N 1013.13 E 1202.96 N 1050.23 E 1250.66 N 1088.49 E 1297.01N 1127.26 E 1344.44 N 1165.20 E 1392.14 N 1202.77 E 1438.24 N 1241.36 E 1483.27 N 1281.15 E 1528.38 N 1320.98 E 1573.84 N 1360.12 E 1619.46 N 1398.34 E 1665.37 N 1435.30 E 1710.57 N 1471.98 E 1755.99 N 1510.04 E 1801.23 N 1547.39 E 1845.95 N 1583.87 E 1890.63 N 1620.63 E 1935.02 N 1658.97 E 1978.87 N 1697.90 E 2022.66 N 1736.38 E 2067.24 N 1774.66 E 2111.59 N 1811.44 E 2156.42 N 1848.09 E 2202.45 N 1883.88 E 2249.27 N 1919.30 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/100ft) (ft) 5933187.33 N 687985.69 E 2.082 1100.87 5933234.45 N 688024.52 E 1.356 1154.37 5933283.16 N 688061.75 E 1,518 1206.98 5933332.09 N 688098.54 E 1.292 1259.25 5933378.08 N 688133.90 E 0.060 1309.11 5933416.78 N 688162.99 E 1.029 1350.44 5933466.26 N 688198.88 E 0.532 1402.08 5933514.90 N 688235.94 E 2.319 1454,50 5933562.19 N 688273.55 E 0.801 1506.94 5933610.56 N 688310.30 E 1.174 1558.97 5933659.17 N 688346.67 E 0.667 1610.73 5933706.21N 688384.11E 1.968 1662.92 5933752.21N 688422,77 E 0.370 1715.85 5933798.30 N 688461.47 E 0,389 1768.84 5933844.72 N 688499.47 E 0.989 1821.31 5933891.27 N 688536.54 E 0.425 1872.97 5933938.09 N 688572.36 E 1.267 1923.56 5933984.18 N 688607.90 E 1.660 1973.63 5934030.53 N 688644.82 E 0.503 2025.07 5934076.68 N 688681.04 E 0.804 2075.78 5934122.29 N 688716.40 E 0.650 2125.51 5934167.87 N 688752.04 E 0.980 2175.47 5934213.20 N 688789.27 E 1.251 2226.83 5934258.00 N 688827.10 E 0.712 2278.54 5934302.73 N 688864.49 E 0.560 2329.81 5934348.24 N 688901.64 E 0.863 2381.17 5934393.50 N 688937.31 E 1.429 2431.04 5934439.22 N 688972.84 E 1.565 2480.96 5934486.12 N 689007.48 E 2.162 2530.48 5934533.80 N 689041.72 E 1.552 2579.93 Comment Alaska State Plane Zone 4 PBU EOA DS 13 Continued... 2 June, 1998 - 16:11 - 3 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl. 8972.24 9067.77 9099.05 9130.45 9162.84 9194.o4 9228.26 9257.17 9288.63 9320.46 9350.58 9378.87 9410.19 9443.57 9475.23 9507.07 9538.49 9570.22 9601,59 9633.03 9664.45 9696.97 9728.29 9759.84 9791.27 9823.83 9855.76 9887.37 9919.36 9949.66 41.200 39.720 39.020 38.900 39.520 41.310 43.150 44.52O 45.050 44.760 44.630 45.220 44.240 44.280 43.920 43.890 43.880 43.72O 43.38O 43.02O 42.970 42.990 42.730 42.510 42.040 42.510 42.830 43.65O 44.670 46.050 Azim, 37.950 42.310 46.170 50.060 53.100 55.030 57.060 59.810 61.710 61.960 63.520 63.330 64.480 66.440 64.710 67.370 65.460 65.790 66.150 66.500 67.870 66.430 67.010 69.000 66.920 67.340 65.060 67.270 65.580 63.880 Sub-Sea Depth (ft) 7887.99 7960.69 7984.87 8009.29 8034.39 8058.14 8083.48 8104.34 8126.67 8149.21 8170.62 8190.65 8212.91 8236.81 8259.55 8282.49 8305.14 8328.04 8350.78 8373.69 8396,68 8420.47 8443.43 8466.64 8489.90 8513.99 8537.47 8560.50 8583.45 8604.74 Vertical Depth (ft) 7966.04 8038.74 8062.92 8087.34 8112.44 8136.19 8161.53 8182.39 8204.72 8227.26 8248.67 8268.70 8290.96 8314.86 8337.60 8360.54 8383.19 8406.09 8428.83 8451,74 8474.73 8498.52 8521.48 8544.69 8567.95 8592.04 8615.52 8638.55 8661.50 8682.79 Sperry-Sun Drilling Services Survey Report for 13-02B PB3 Your Ref: API-500292032472 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 2297.71N 1957.03 E 5934583.16 N 689078.24 E 2.666 2632.12 2345.10 N 1996.93 E 5934631.53 N 689116.96 E 3.342 2685.98 2359.31 N 2010.77 E 5934646.09 N 689130.44 E 8.140 2703.88 2372.49 N 2025.46 E 5934659.62 N 689144.80 E 7.798 2722.23 2385.21 N 2041.50 E 5934672.73 N 689160.52 E 6.234 2741.68 2397.07 N 2057.88 E 5934685,00 N 689176.60 E 6.999 2761.16 2409.91 N 2076.96 E 5934698.31 N 689195.35 E 6.693 2783.50 2420.38 N 2094.02 E 5934709.20 N 689212.15 E 8.115 2803.13 2431.21N 2113.35 E 5934720.50 N 689231.21E 4.576 2825.02 2441.81N 2133.16 E 5934731.60 N 689250.75 E 1.067 2847.28 2451.52 N 2151.99 E 5934741.76 N 689269.33 E 3.668 2868.31 2460.45 N 2169.86 E 5934751.14 N 689286.97 E 2.139 2888.16 2470.15 N 2189.65 E 5934761.32 N 689306.52 E 4.058 2910.09 2479.82 N 2210.84 E 5934771.52 N 689327.46 E 4.100 2933.32 2488.93 N 2230,90 E 5934781.13 N 689347.29 E 3.969 2955.29 2497.90 N 2251.08 E 5934790.59 N 689367.24 E 5.794 2977.33 2506.61N 2271.04 E 5934799.79 N 689386.97 E 4.214 2999.07 2515.68 N 2291.04 E 5934809.35 N 689406.75 E 0.879 3020.97 2524.48 N 2310.78 E 5934818.64 N 689426.26 E 1.342 3042.54 2533.12 N 2330.49 E 5934827.77 N 689445.75 E 1.375 3064.02 2541.43 N 2350.24 E 5934836.56 N 689465.29 E 2.978 3085.43 2550.04 N 2370.67 E 5934845.68 N 689485.50 E 3.019 3107.58 2558.46 N 2390.24 E 5934854.58 N 689504.85 E 1.509 3128.85 2566.46 N 2410.05 E 5934863.07 N 689524.46 E 4.327 3150.20 2574.39 N 2429.64 E 5934871.48 N 689543.85 E 4.696 3171.33 2582.90 N 2449.82 E 5934880.49 N 689563.81 E 1.684 3193.21 2591.63 N 2469.62 E 5934889.71N 689583.39 E 4.942 3214.81 2600.38 N 2489.43 E 5934898.95 N 689602.97 E 5.447 3236.42 2609.30 N 2509.85 E 5934908.37 N 689623.17 E 4.869 3258.67 2618.50 N 2529.34 E 5934918.06 N 689642.42 E 6.056 3280.14 Comment Alaska State Plane Zone 4 PBU EOA DS 13 Continued... 2 June, 1998 - 16:11 - 4 - DrillQuest Prudhoe Bay Unit Measured Depth (rt) Incl. 9977.09 10043.04 10074.71 101 O6.62 10138.30 10156.22 10170.71 10202.90 10234.56 10266.39 10299.13 10331.11 10361.63 10393.53 10425.45 10457.24 10488.95 10520.76 1 O553.23 10585.14 10617.20 10648.73 10680.60 10712.62 10744.07 10775.25 10817.22 10847.94 10879.52 10911.23 46.530 48.74O 59.43O 70.30O 81.010 87.440 92.310 100,000 103.240 105.34O 104.960 101.36O 97,420 93.140 88.610 87.170 86.520 87.160 87.530 90.250 92.740 94.220 93.950 92.500 89.63O 88.860 89.510 89.570 88.980 89.140 63.690 61.620 6O.78O 60.260 62.490 64.560 66.950 68.560 72.280 74.790 75.0O0 74.330 75.330 74.280 74.050 73.060 75.120 78.680 82.720 85.890 88.960 91.270 91.440 92.170 92.430 92.250 92.070 92.200 91.800 91.550 Sub-Sea Depth (ft) 8623.69 8668.14 8686.69 8700.22 8708.O6 8709.86 8709.89 8706.44 8700.06 8692.21 8683.65 8676.37 8671.39 8668.46 8667.97 8669.14 8670,89 8672.64 8674.14 8674.76 8673.93 8672.01 8669.74 8667.94 8667.36 8667.77 8668.36 8668.61 8669.01 8669.53 Sperry-Sun Drifting Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 8701.74 2627.26 N 2547.13 E 8746.19 2649.65 N 2590.40 E 8764.74 2662.00 N 2612.84 E 8778.27 2676.20 N 2637.94 E 8786.11 2690.87 N 2664.85 E 8787.91 2698.82 N 2680.80 E 8787.94 2704.76 N 2694.01E 8784.49 2716.87 N 2723.61E 8778.11 2727.27 N 2752.81E 8770.26 2736.01N 2782.39 E 8761.70 2744.25 N 2812.90 E 8754.42 2752.48 N 2842.92 E 8749.44 2760.36 N 2871.98 E 8746.51 2768.68 N 2902.63 E 8746.02 2777.39 N 2933.32 E 8747.19 2786,38 N 2963.79 E 8748.94 2795.06 N 2994.24 E 8750.69 2802.26 N 3025.17 E 8752.19 2807.50 N 3057.17 E 8752.81 2810.66 N 3088.91E 8751.98 2812.10 N 3120.92 E 8750.06 2812.04 N 3152.39 E 8747.79 2811.29 N 3184.17 E 8745.99 2810.28 N 3216.12 E 8745.41 2809.02 N 3247.54 E 8745.82 2807.75 N 3278.69 E 8746.41 2806.17 N 3320.63 E 8746.66 2805.02 N 3351.32 E 8747.06 2803.92 N 3382.88 E 8747.58 2802,99 N 3414.57 E Survey Report for 13-02B PB3 Your Ref: API-500292032472 Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/100ft) (ft) 5934927.25 N 689659.99 E 1.820 3299.86 5934950.71 N 689702.69 E 4.075 3348.21 5934963.61 N 689724.81 E 33.822 3373.54 5934978.43 N 689749.56 E 34.096 3402.01 5934993.77 N 689776.10 E 34.485 '3432.34 5935002.10 N 689791.85 E 37.675 3450.05 5935008.37 N 689804.90 E 37.436 3464.50 5935021.21 N 689834,19 E 24.401 3496.46 5935032.33 N 689863.13 E 15.400 3527.46 5935041.80 N 689892.48 E 10.095 3558.23 5935050.79 N 689922.78 E 1.315 3589.71 5935059.77 N 689952.59 E 11.440 3620.72 5935068.37 N 689981.44 E 13,308 3650.71 5935077.45 N 690011.87 E 13.811 3682.34 5935086.91 N 690042.34 E 14.210 3714.15 5935096.66 N 690072.58 E 5.496 3745.85 5935106.09 N 690102.80 E 6.803 3777.42 5935114.05 N 690133.54 E 11.354 3808.92 5935120.08 N 690165.40 E 12.481 3840.76 5935124.04 N 690197.06 E 13.088 3871.63 5935126.27 N 690229.02 E 12.326 3902.15 5935126.99 N 690260.48 E 8.690 3931.65 5935127.02 N 690292.27 E 1.000 3961.20 5935126.81 N 690324.24 E 5.068 3990.82 5935126.33 N 690355.67 E 9.163 4019.85 5935125.83 N 690386.85 E 2.536 4048.63 5935125.29 N 690428.81 E 1.607 4087.42 5935124.90 N 690459.53 E 0.466 4115.82 5935124.58 N 690491.10 E 2.257 4145.04 5935124.44 N 690522.81E 0.936 4174.44 Comment Alaska State Plane Zone 4 PBU EOADS13 ContinueS.. 2 June, 1998 - 16:11 - 5 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl, 10942.82 10974.60 11006.36 11038.13 11069.93 90.920 91.360 90.770 91.570 94.500 Azim, Sub-Sea Depth (ft) Vertical Depth (ft) Sperry-Sun Drilling Services Local Coordinates Northings Eastings (ft) (ft) 90.830 8669.51 8747.56 2802.34 N 3446.15 91.170 8668.88 8746.93 2801.78 N 3477.92 90,230 8668.29 8746.34 2801.39 N 3509.68 89.140 8667.64 8745.69 2801.57 N 3541.44 90.340 8665.96 8744.01 2801.71 N 3573.19 11102.87 96.640 90.950 8662.76 8740.81 2801.35 N 3605.97 11134.96 95.520 91.460 8659.36 8737.41 2800.67 N 3637.87 11166.44 92.990 91.770 8657.03 8735.08 2799.79 N 3669.25 11198.34 91.050 92.550 8655.90 8733.95 2798.59 N 3701.10 11229.09 89.920 91,970 8655.64 8733.69 2797.37 N 3731.83 11261.56 87.530 92,610 8656.37 8734.42 2796.08 N 3764.26 11294.18 86.520 92.810 8658.06 8736.11 2794.54 N 3796.80 11326.08 86.180 93.040 8660.09 8738.14 2792.91 N 3828.60 11357.86 85.680 92.670 8662.34 8740.39 2791.33 N 3860.26 11389.75 88.430 94.200 8663.98 8742.03 2789.43 N 3892.04 11421.36 91.760 95.650 8663.93 8741.98 2786.71 N 3923.53 11453.04 91.420 95.080 8663.05 8741.10 2783.75 N 3955.06 11484.80 91.760 96.330 8662.17 8740.22 2780.60 N 3986.65 11516.53 91.420 96.860 8661.29 8739.34 2776.95 N 4018.16 11548.36 89.600 96.940 8661.01 8739.06 2773.13 N 4049.75 96.820 8661.40 8739.45 2769.32 N 4081.29 97.880 8662.10 8740.15 2765.28 N 4112.63 97.680 8662.68 8740.73 2760.99 N 4144.06 97.550 8662.92 8740.97 2756.78 N 4175.50 96.660 8663.34 8741.39 2752.86 N 4206.95 95.980 8664.21 8742.26 2749.22 N 4239.86 95.730 8665.26 8743.31 2745.92 N 4272.07 95.420 8666.32 8744.37 2742.82 N 4303.75 95.180 8667.13 8745.18 2739.87 N 4335.54 95.000 8668.41 8746.46 2737.05 N 4367.27 88.980 88.49O 89.410 89.720 88.770 88.210 88.090 88.090 89.010 86.390 11580.13 11611.74 11643.46 11675.18 11706.88 Survey Report for 13-02B PB3 Your Ref: API-500292032472 11740.00 11772.40 11804.25 11836.19 11868.07 Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/100ft) (ft) 5935124.57 N 5935124.80 N 5935125.20 N 5935126.17 N 5935127.10 N 5935127.54 N 5935127.66 N 5935127.56 N 5935127.15 N 5935126.70 N 5935126.20 N 5935125.47 N 5935124.63 N 5935123.84 N 5935122.72 N 5935120.79 N 5935118.61N 5935116.24 N 5935113.38 N 5935110.34 N 5935107.32 N 5935104.06 N 5935100.54 N 5935097.12 N 5935093.98 N 5935091.15 N 5935088.65 N 5935086.34 N 5935084.18 N 5935082.15 N 690554.40 E 6.078 4203.84 690586.17 E 1.750 4233.45 690617.92 E 3.494 4263.10 690649.67 E 4.255 4292.95 690681.41 E 9.954 4322.78 690714.18 E 6.753 4353.40 690746.09 E 3.831 4383.10 690777.48 E 8.097 4412.22 690809.36 E 6.554 4441.69 690840.10 E 4.131 4470.09 690872.56 E 7.620 4500.06 690905.13 E 3.156 4530.05 690936.95 E 1.286 4559.31 690968.64 E 1.955 4588.46 691000.47 E 9.865 4617.61 691032,01E 11.490 4646.21 691063.60 E 2.094 4674.76 691095.26 E 4.077 4703.29 691126.85 E 1,984 4731.59 691158.53 E 5.723 4759.90 691190.16 E 1.988 4788.16 691221.59 E 3.694 4816.16 691253.11E 2.968 4844.15 691284.64 E 1.060 4872.18 691316.18 E 4.106 4900.33 691349.17 E 2.659 4929.93 691381.46 E 0.856 4959.00 691413.20 E 0.973 4987.65 691445.06 E 2.977 5016.45 691476.85 E 8.238 5045.23 Comment Alaska State Plane Zone 4 PBU EOADS13 Continued,.. 2 June, 1998 - 16:~!1 - 6 - DrillQuest Sperry-Sun Drilling Services Survey Report for 13-02B PB3 Your Ref: AP1-500292032472 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) . (ft) (°/100ft) (ft) 11899.45 85.990 94.620 8670.49 8748.54 2734.42 N 4398.47 E 11931.00 ' 86.990 95.080 8672.42 8750.47 2731.76 N 4429.85 E 11962.90 90.990 94.780 8672.98 8751.03 2729.02 N 4461.62 E 12015.00 90.990 94.780 8672.08 8750.13 2724.68 N 4513.53 E 5935080.30 N 691508.10 E 1.756 5073.58 5935078.41N 691539.54 E 3.488 5102.09 5935076.46 N 691571.37 E 12.574 5130.94 5935073.41 N 691623.37 E 0.000 5178.13 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 69.720° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12015.00ft., The Bottom Hole Displacement is 5272.18ft., in the Direction of 58.882° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 3410.00 3409.85 23.65 S 8.27 E Tie-on Survey 3418.00 3417.85 23.63 S 8.39 E Window point 12015.00 8750.13 2724.68 N 4513.53 E Projected Survey Comment Projected Survey Alaska State Plane Zone 4 PBU EOA DS 13 2 June, 1998 - 16:11 - 7 - DrillQuest Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 13 13-02B SURVEY REPORT 2 June, 1998 Your Ref: AP1-500292032402 Last Survey 28-March-98 Job # AKMWSOf66 KBE- 78.05' Surface Coordinates: 5932237.ii~,~~~~~1.1058" N, 211° 30' 36.6093" E) DRILLING SERVICES A DI~'ISION OF DI~:~B I.'%'I)Lr:ST~IES. I~c. ORIGINAL JUN 1 9 1995 Alaska Oii & Gas Cons. Commission And~=age Survey Ref: svy2844 Prudhoe Bay Unit Measured Depth (ft) Incl. 10775.26 10806.00 1 O809.50 10842.85 1 O876.00 1 O907.84 1 O940.50 1 O97O.89 11002.73 11034.58 11066.46 11098.32 11130.12 11161.83 11190.09 11222.35 11254.55 11286.39 11316.94 11350.04 11382.10 11413.91 11445.71 11477.75 11508.44 11540.27 11572.16 11604.03 11636.41 11668.90 88.860 88.050 87.960 87.320 86.890 90.180 91.450 92.840 94.970 94.780 94.440 94.980 95.060 95.120 95.O90 94.160 91.940 90.590 90.180 90.920 92.340 92.310 92.440 92.310 92.400 91.450 88.210 87.870 87.570 87.290 Azim. 92.250 91.470 91.390 87.330 84.340 83.470 84.550 85.500 85.760 84.96O 84.260 84.9O0 83.24O 87.03O 90.920 90.320 92.o40 92.280 91.760 90.470 91.600 92.110 93.550 92.590 93.270 94.100 94.630 95.110 95.8OO 95.780 Sub-Sea Depth (ft) 8667.77 8668.60 8668.72 8670.09 8671.77 8672.58 8672.12 8670.98 8668.81 8666.10 8663.54 8660.92 8658.14 8655.33 8652.81 8650.21 8648.50 8647.79 8647.59 8647.27 8646.36 8645.07 8643.75 8642.42 8641.16 8640.O9 8640.19 8641.28 8642.57 8644.02 Vertical Depth (ft) 8745.82 8746.65 8746.77 8748.14 8749,82 8750.63 8750.17 8749.03 8746.86 8744.15 8741.59 8738.97 8736.19 8733.38 873O.86 8728.26 8726.55 8725.84 8725.64 8725.32 8724.41 8723.12 8721.80 8720.47 8719.21 8718.14 8718.24 8719.33 872O.62 8722.07 Sperry-Sun Drilling Services Survey Report for 13-02B Your Ref: API-500292032402 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 2807.75 N 3278.70 E 5935125.83 N 690386.86 E 4048.64 2806.75 N 3309.41E 5935125.59 N 690417.59 E 3.658 4077.10 2806,66 N 3312.91 E 5935125.59 N 690421.08 E 3.440 4080.35 2807.03 N 3346.22 E 5935126.79 N 690454.38 E 12.314 4111.73 2809.44 N 3379.24 E 5935130.01 N 690487.32 E 9.101 4143.53 2812.82 N 3410.88 E 5935134.17 N 690518.87 E 10.688 4174.39 2816.23 N 3443.36 E 5935138.39 N 690551.26 E 5.104 4206.03 2818.86 N 3473.61E 5935141.77 N 690581.44 E 5.539 4235,32 2821.28 N 3505.28 E 5935144.97 N 690613.04 E 6.739 4265.87 2823.85 N 3536.91E 5935148.33 N 690644.59 E 2.573 4296.43 2826.83 N 3568.55 E 5935152.09 N 690676.15 E 2.435 4327.14 2829.83 N 3600.16 E 5935155.88 N 690707.67 E 2.623 4357.83 2833.10 N 3631.67 E 5935159.93 N 690739.09 E 5.206 4388.52 2835.78 N 3663.13 E 5935163.39 N 690770.48 E 11.906 4418.96 2836.29 N 3691.27 E 5935164.59 N 690798.60 E 13.711 4445.53 2835.94 N 3723.42 E 5935165.04 N 690830.75 E 3.427 4475.57 2835.28 N 3755.57 E 5935165.17 N 690862.90 E 8.717 4505.49 2834.08 N 3787.38 E 5935164.76 N 690894.73 E 4.306 4534.91 2833,00 N 3817.91 E 5935164.44 N 690925.27 E 2.168 4563.18 2832.35 N 3851.00 E 5935164.62 N 690958.37 E 4.493 4593.99 2831.78 N 3883.04 E 5935164.84 N 690990.42 E 5.660 4623.85 2830.75 N 3914.81 E 5935164.60 N 691022.20 E 1.605 4653.29 2829.18 N 3946.54 E 5935163.81 N 691053.96 E 4.543 4682.51 2827.46 N 3978.51 E 5935162.89 N 691085.96 E 3.021 4711.90 2825.90 N 4009.13 E 5935162.09 N 691116.61 E 2.233 4740.08 2823.85 N 4040.88 E 5935160.83 N 691148.40 E 3.962 4769.15 2821.43 N 4072.67 E 5935159.19 N 691180.24 E 10.295 4798.13 2818.72 N 4104.40 E 5935157.28 N 691212.04 E 1.845 4826.96 2815.65 N 4136.61 E 5935155.00 N 691244.31 E 2.322 4856.11 2812.37 N 4168.90 E 5935152.53 N 691276.67 E 0.864 4885.26 Comment Tie-on Survey Window point Alaska State Plane Zone 4 PBU EOADS13 Continued... 2 June, 1998 - 16:20 - 2 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl. 11700.81 11732.84 11764.62 11796.51 11828.30 11860.48 11892.25 11924.07 11955,88 11987,94 12017.84 12051,20 12083,11 12114.82 12146.56 12178.75 12210.12 12241.89 12273.82 12306.33 12337.97 12369.81 12403.36 12435.17 12468.13 12499.93 12531.66 12563.50 12595.43 12627.46 86.980 87.600 89.600 89.780 89.780 89.600 89.350 90.340 90.590 90.520 89.570 89.140 89.140 88,980 89.200 89.350 89.630 9O.46O 90.710 90.770 90.960 90.650 90.490 89.510 87.720 87.44O 87.160 87.160 90.400 91.170 95.210 95.490 96.270 96.810 98.100 97.400 97.870 99.380 99.84O 100.050 100.350 100.320 101.170 101.380 101.520 101,060 102.050 101.720 101.820 101.780 102.540 102.160 101.910 101.810 100.450 101.210 101.430 101.370 100.690 101.210 Sub-Sea Depth (ft) 8645.62 8647.13 8647.91 8648.08 8648.20 8648.38 8648.67 8648.75 8648.50 8648.19 8648.16 8648.54 8649.O2 8649.54 8650.04 8650.45 8650.73 8650.70 8650.38 8649.96 8649.48 8649.03 8648.70 8648.7O 8649.50 8650.84 8652.33 8653.91 8654.59 8654.15 Vertical Depth (ft) 8723.67 8725.18 8725.96 8726.13 8726.25 8726.43 8726.72 8726.8O 8726.55 8726.24 8726.21 8726.59 8727.07 8727.59 8728.09 8728.50 8728.78 8728.75 8728.43 8728.01 8727.53 8727.08 8726.75 8726.75 8727.55 8728.89 8730.38 8731.96 8732.64 8732.2O Sperry-Sun Drilling Services Survey Report for 13-02B Your Ref: API-500292032402 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 2809.32 N 4200.63 E 5935150.26 N 691308.46 E 2.031 4913.96 2806.34 N 4232.48 E 5935148,07 N 691340.38 E 2.124 4942.81 2803.08 N 4264.08 E 5935145.60 N 691372.05 E 6.755 4971.32 2799.45 N 4295.77 E 5935142.76 N 691403.82 E 1.785 4999.78 2795.32 N 4327.29 E 5935139.41N 691435.43 E 4,058 5027.92 2790.99 N 4359.17 E 5935135.87 N 691467.41 E 2.246 5056.32 2786,76 N 4390.66 E 5935132.43 N 691498.99 E 1.676 5084.40 2781.99 N 4422.12 E 5935128.44 N 691530.56 E 5.674 5112.25 2776.68 N 4453.48 E 5935123,91N 691562,05 E 1.646 5139.83 2771.15 N 4485.06 E 5935119.15 N 691593,75 E 0.690 5167.53 2765,85 N 4514.48 E 5935114.59 N 691623,30 E 3.332 5193.30 2759.87 N 4547.30 E 5935109.42 N 691656.26 E 1.292 5222.01 2753.92 N 4578.65 E 5935104.25 N 691687.74 E 2.663 5249.35 2747,72 N 4609.74 E 5935098.83 N 691718.98 E 0.832 5276,36 2741.42 N 4640.84 E 5935093,30 N 691750,23 E 0.822 5303.36 2735.12 N 4672.41 E 5935087.78 N 691781.94 E 1,503 5330.78 2728.83 N 4703.14 E 5935082.26 N 691812.82 E 3.280 5357.43 2722.29 N 4734.23 E 5935076,50 N 691844.06 E 2.811 5384.32 2715.78 N 4765.49 E 5935070.76 N 691875.47 E 0.843 5411.39 2709.13 N 4797.31E 5935064.90 N 691907.44 E 0.222 5438.93 2702.47 N 4828.23 E 5935059.01N 691938,53 E 2.476 5465.63 2695.66 N 4859.33 E 5935052.97 N 691969.79 E 1.540 5492.44 2688.66 N 4892.14 E 5935046.79 N 692002.76 E 0.885 5520.79 2682.13 N 4923.28 E 5935041.03 N 692034.04 E 3.097 5547.73 2675.76 N 4955.60 E 5935035.47 N 692066.52 E 6.820 5575.85 2669.80 N 4986.81 E 5935030.28 N 692097.86 E 2.545 5603.05 2663.57 N 5017.89 E 5935024.83 N 692129.09 E 1.122 5630.05 2657.29 N 5049,06 E 5935019.32 N 692160.41 E 0.188 5657.11 2651.18 N 5080.39 E 5935013.99 N 692191.88 E 10.368 5684.38 2645.10 N 5111.83 E 5935008.69 N 692223.46 E 2.901 5711.76 Comment Alaska State Plane Zone 4 PBU EOADS13 Continued... 2 June, 1998 - 16:20 - 3 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl. 12659.11 12691.12 12722.85 12754.79 12786.54 12818.37 12850.54 12882.22 12913.97 12946.57 12978.33 12999.32 13040.o4 13073.26 13104,86 13134.47 13166.19 13197.99 13229.72 13261.65 13293.38 13323.63 13355.10 13386.88 13420.21 13451.96 13483.74 13516.01 13547.80 13579.62 90.920 90.680 90.680 90.340 90,190 90.430 90.930 91.270 91.29o 91.080 90.310 90.000 89.720 89.690 89.780 90.030 89.970 89.940 89.880 89.450 89.660 90.000 89.480 88.740 87.900 87.750 87.690 88.490 89.780 90.920 100.800 101.610 101.180 lO2.15o 103.050 102.820 102.880 lO2.66o 103.11o 102.110 103.060 103.54o lO3.720 103.660 104.180 104.630 104.930 lO5.22o 105.000 102.010 102.79o lO3.240 102.270 102.420 99.960 99.790 99.410 100.480 100.850 lOO,900 Sub-Sea Depth (ft) 8653.57 8653.13 8652.75 8652.47 8652.32 8652.15 8651.77 8651.16 865O.45 8649.77 8649.39 8649.33 8649.43 8649.60 8649.75 8649.80 8649.80 8649.82 8649.87 8650.06 8650.31 8650.39 8650.54 8651.03 8652.01 8653.21 8654,48 8655.55 8656.03 8655.84 Vertical Depth (ft) 8731.62 8731.18 8730.80 8730.52 8730.37 8730.20 8729.82 8729.21 8728.50 8727.82 8727.44 8727.38 8727.48 8727.65 8727.80 8727.85 8727.85 8727.87 8727.92 8728.11 8728.36 8728.44 8728.59 8729.08 8730.06 8731.26 8732.53 8733.60 8734.08 8733.89 Sperry-Sun Drilling Services Survey Report for 13-02B Your Ref: API-500292032402 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 2639.06 N 5142.90 E 5935003.42 N 692254.66 E 1.517 5738.81 2632.84 N 5174.29 E 5934997.98 N 692286.21 E 2.639 5766.10 2626.57 N 5205.39 E 5934992.49 N 692317.45 E 1.355 5793.10 2620.11 N 5236.67 E 5934986.81 N 692348.88 E 3,218 5820.20 2613.19 N 5267.66 E 5934980.65 N 692380.03 E 2.874 5846.87 2606.06 N 5298.68 E 5934974.30 N 692411.22 E 1.044 5873.50 2598.91 N 5330.04 E 5934967.92 N 692442.75 E 1.565 5900.44 2591.91 N 5360.93 E 5934961.69 N 692473.80 E 1.278 5926.98 2584.83 N 5391.88 E 5934955.38 N 692504.91 E 1.418 5953.56 2577.71 N 5423.68 E 5934949.06 N 692536.89 E 3.134 5980.92 2570.79 N 5454.68 E 5934942.91 N 692568.04 E 3.850 6007.60 2565.96 N 5475.10 E 5934938.59 N 692588.58 E 2.722 6025.09 2556.37 N 5514.68 E 5934929.98 N 692628.38 E 0.817 6058.88 2548.51 N 5546.95 E 5934922.92 N 692660.84 E 0.202 6086.43 2540.90 N 5577.62 E 5934916.08 N 692691.69 E 1.670 6112.56 2533.54 N 5606.30 E 5934909.43 N 692720.54 E 1.739 6136.91 2525.45 N 5636.97 E 5934902.10 N 692751.41 E 0.965 6162.88 2517.18 N 5667.68 E 5934894.59 N 692782.31 E 0.917 6188.81 2508.90 N 5698.31 E 5934887.08 N 692813.14 E 0.719 6214.68 2501.45 N 5729.35 E 5934880.40 N 692844.35 E 9.460 6241.21 2494.64 N 5760.34 E 5934874.36 N 692875.50 E 2.546 6267.92 2487.82 N 5789.82 E 5934868.28 N 692905.14 E 1.864 6293.20 2480.88 N 5820.51 E 5934862.09 N 692935.99 E 3.497 6319.59 2474.08 N 5851.55 E 5934856.07 N 692967.19 E 2.376 6346.35 2467.62 N 5884.23 E 5934850.42 N 693000.02 E 7.796 6374.76 2462.18 N 5915.49 E 5934845.75 N 693031.40 E 0.714 6402.19 2456.88 N 5946.80 E 5934841.24 N 693062.84 E 1.210 6429.73 2451.31 N 5978.56 E 5934836.46 N 693094.73 E 4.139 6457.60 2445.43 N 6009.80 E 5934831.35 N 693126.10 E 4.221 6484.86 2439.42 N 6041.05 E 5934826.12 N 693157.49 E 3.586 6512.09 Comment Alaska State Plane Zone 4 PBU EOA DS 13 Continued... 2 June, 1998 - ~6:20 - 4 - DriilQuest Sperry-Sun Drilling Services Survey Report for 13-02B Your Ref: AP1-500292032402 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth ' Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/lOOft) (ft) 13611.35 90.920 101.370 8655.33 8733.38 13643.03 90.800 101.470 8654.85 8732.90 13674.88 90.520 101.900 8654.49 8732.54 13706.78 90.520 102.260 8654.20 8732.25 13739.74 90.370 101.910 8653.94 8731.99 13770.96 90.340 101.590 8653.75 8731.80 13804.27 89.600 101.860 8653.77 8731.82 13834.13 89.690 101.230 8653.95 8732.00 13865.84 88.770 101.360 8654.38 8732.43 13898.16 88.640 101.420 8655.11 8733.16 13929.96 88.500 101.670 8655.90 8733.95 13961.89 87.010 102.080 8657.15 8735.20 13981.47 86.850 102.430 8658.20 8736.25 14050.00 86.850 102.430 8661.97 8740.02 2433.30 N 6072.18 E 5934820.77 N 693188.76 E 1.481 6539.16 2427.03 N 6103.22 E 5934815.27 N 693219.96 E 0.493 6566.11 2420.58 N 6134,41 E 5934809.60 N 693251.29 E 1.611 6593.13 2413.90 N 6165.60 E 5934803.70 N 693282.64 E 1.128 6620.08 2407.00 N 6197.83 E 5934797.60 N 693315.03 E 1.155 6647.91 2400.64 N 6228.40 E 5934792.00 N 693345.75 E 1.029 6674.38 2393.87 N 6261.01 E 5934786.04 N 693378.52 E 2.365 6702.63 2387.90 N 6290.27 E 5934780.79 N 693407.91 E 2.131 6728.00 2381.69 N 6321.36 E 5934775.36 N 693439.15 E 2.930 6755.01 2375.31N 6353.04 E 5934769.76 N 693470.97 E 0.443 6782.51 2368.94 N 6384.18 E 5934764.17 N 693502.27 E 0.901 6809.52 2362.38 N 6415.40 E 5934758.39 N 693533.64 E 4.840 6836.53 2358.23 N 6434.51E 5934754.71N 693552.85 E 1.963 6853.02 2343.50 N 6501.33 E 5934741.64 N 693620.01E 0.000 6910.59 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. ,The Dogleg Severity is in Degrees per 100ft. . Vertical Section is from Well and calculated along an Azimuth of 69.720° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14050.00ft., The Bottom Hole Displacement is 6910.81ft., in the Direction of 70.178° (True). Comment Projected Survey Alaska State Plane Zone 4 PBU EOADS13 Continued... 2 June, '1998 - 16:20 - 5 - DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 13-02B Your Ref: API-500292032402 Alaska State Plane Zone 4 PBU EOA DS 13 Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 3410.00 3409.85 23.65 S 8.27 E 3418.00 3417.85 23.63 S 8.39 E 10775.26 8745.82 2807.75 N 3278.70 E 10806.00 8746.65 2806.75 N 3309.41 E 14050.00 8740.02 2343.50 N 6501.33 E Comment ~.Su rvey Windo'~,oint Tie-on Survey Window point Projected Survey 2 June, 1998 - 16:20 - 6 - DrillQuest BP EXPLORATION ARCO Alaska, Inc. To: Date: From: Subject: Gentlemen: Short Summary: The State of Alaska, A.O.G.C.C. April 30, 1998 Matt Scheuring Doyon 14 Operations Drilling Engineer 13-02B Operations Summary: The liner on well 13-02B has been set approximately 800-900' high. (See attached diagram) Detailed Explanation: On the evening of April 29, 1998, Doyon Rig 14 was running a slotted production liner on Drill Site 13, when deeper progress was not possible due to hole drag which stuck the liner at a measured depth of 13,148' MD, between 800'-900' short of TD. The slotted production liner was not planned to be cemented. The depths for the liner were as follows: Planned top of liner - 9872' MD Actual top of Liner - 8986' MD Planned liner shoe - 14,050' MD Actual liner shoe - 13,148' MD Attached is a wellbore diagram showing the current state of DS 13-02B. The liner hanger and liner top packer were set @ 8986' MD and tested to 3000 psi for 30 min. without leaks. If there are any questions, feel free to call me at 584-4809. Respectfully submitted, Matt Scheuring, Operations Drilling Engineer, Doyon 14 13-02B Horizontal Sidetrack Top of Liner @ 8986' MD 7" Shoe @ 10,036' MD TD OH @ 14,050' MD Top of Slotted section @ 9561' MD Bottom of Liner @ 13,148' MD - STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [~] Repair Well E~ Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator 15. ARCO Alaska Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2171' NSL, 31' WEL, SEC. 14, T10N, R14E, UM At top of productive interval N/A At effective depth 4208' NSL, 1473' EWL, SEC. 13, T10N, R14E, UM At total depth 4545' NSL, 2063' EWL, SEC. 13, T10N, R14E, UM 12. Present well condition summary (Planned) (Planned), Type of well: [~ Development [~ Exploratory E] Stratigraphic [~]Service . Datum Elevation (DF or KB) Plan KBE = 74.30' Total depth: measured 9362 feet true vertical 8475 feet Effective depth: measured 8500 feet true vertical 7984 feet Plugs (measured) Junk (measured) 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 13-02B 9. Permit Number 97-253 / 398-030 10. APl Number 50-029-20324-02 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 20 bbl, 15.8 ppg, Class 'G' was set in the 7" casing from 9026' to 8500' Casing Length Size Structural Conductor 20" Surface 13-3/8" Intermediate 9-5/8" Production Liner 7" Cemented MD TVD 167 sx Class 'G' 7600 sx Class 'G' 1000 sx Class 'G' 652 sx Class 'G' 127' 127' 2741' 2741' 8500' 7894' 3460'-9026' 3460'-8308' Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None 13. Attachments [] Description summary of proposal ~] Detailed operations program I~ BOP sketch 14. Estimated date for commencing operation March 27, 1998 16. If proposal was verbally approved Blair Wondzell Name of approver contact Engineer Name/Number: Bob Kaluza, 564-5344 3/27/98 Date approved 15. Status of well classifications as: [] Oil [] Gas I--I Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby cd, fy that the fot[cegoing is true and correct to the best of my knowledge Signed Ja Title Engineering Supervisor Commission Use Only Date Conditions of Approval: Notify Commission so representative ma_,.y witness Plug integrity__ BOP Test 1,,/ Location clearance I,~f°e'~.e.~o .;~P~] Mechanical Integrity Test__ Subsequent form required 10- /./~O-/' _ i-?--~-,~'--'-'"~ drlglnat Signc. d By A order of the I.' _~:~dA~Y .... ,_,~/,~mmission David W, ,Johnston Commissioner I Approval BP EXPLORATION To: Dennis Ackerman From' Subject: Bob Kaluza, ODE, SSD MB 8-1 Well Plan Revision, DS 13-02B Date: March 27, 1998 On 03/19/98, Doyon rig 14 moved on Well 13-02B. The well had been 'Shutdown of Well Operations' on 03/17/98 due a contractual agreement that Doyon rig 141 would leave PBU field to drill at the Alpine field. Prior to rig 141 leaving for Alpine, a cement plug was set in the sidetracked wellbore 25' below the 7" casing window at + 9,200' MD. 3,000' of 4 1/2" tubing was hung below a tubing hanger and a dry hole cap was installed on top of the well prior to shutdown. When Doyon rig 14 arrived, the 4 1/2" tubing was pulled and a directional drilling assembly RIH to re-enter the sidetrack and drill off the cement plug through the Kingak formation to the original Sag River target. After drilling 130' of the Kingak the shale packed off (as it had 375' into the original sidetrack wellbore). The pipe was worked free, but it was decided to move up hole + 150', set another whipstock, mill a new window, displace the well to 11 ppg, Oil Base Mud, and drill a new wellbore to the original Sag River target. After drilling 324' of new 6" hole out of the new window (45° to 80° inclination) the Kingak shale once again packed off the drill string. The pipe was worked free but could not drill back to bottom (TD + 9,362' MD, window at + 9,038'). A 6" fixed blade hole opener with rotating assembly was RIH but, it too, could not open the hole back to bottom. A 20 bbl, 15.8 ppg, Class 'G' cement plug was set in the open 7" casing from 9,026' to 8,500'. The plan ahead is to safely displace the oil base mud out of the hole. Set an EZSV plug + 3,450', set a 9 5/8" Whipstock on top of the EZSV, mill a new window through the casing into the SV3 formation, directionally drill to the original target in the Sag River. The plan is to drill the Kingak at 40° inclination rather than 85° (we have learned that the Kingak Shale is mechanically unstable under DS 13). Set 7" liner in TSAG, short radius drill to the original target polygon of the Sag River formation to TD. Run and test 4 1/2" slotted liner and complete well with 4 1/2" tubing, (3) GLM's and EOA tail assy. Revision to the ©riqinal Well Plan 1. Carefully and safely displace Oil Base Mud to Seawater. POOH. 2. Change rams, Test BOPE 3. RU e-line set EZSV + 3,450' (7" scab liner top at 3,460'). Follow Whipstock Sidetracks RP. Note' Will need Gyro Data to orient Whipstock and tool face. Shut in well and test casing to 3,000 psi for 30 minutes against the Bridgeplug to insure casing integrity. If casing leaks PU a RTTS for 7", 29# and identify the leak depth (notify ODE). 4. MU 8 ¥2" GT-LG1XL bit with Sperry Sun MWD assembly (no GR), RIH, drill ahead to bit exhaustion. Note: This bit should drill this upper section 70' - 120'/hr. 5. MU Hycalog DS 70 PDC, MWD/GR drill to 10' into Sag River. Circ and clean hole for csg. POOH SLM. Note: Will be crossing a 30-50' throw fault @ 600' before TSAG. Need to PU GR to help find Sag River. 6. Run and cement 7", 26#, L-80 liner. Space the liner hanger/packer at 1,000' MD inside the 9 5/8" csg ( there is a weak spot in the 9 5/8" csg at _+ 1,250'). Cement the liner in place with the total lead cement volume based on 50 % excess in the openhole, plus 80' shoe joint. Displace at 8-10 bbl/min. Put cement top 1000' above the 7" shoe. 7. MU 6" STR 09D bit, MWD/GR BHA and PU 4,000' 3 1/2" DP. Clean out to 7" float collar and test casing to 3000 psi for 30 mins. Perform a well kill drill prior to drill out. Drill 20' of new hole and run a formation integrity at 0.5 ppg or more than expected mud weight to be used to drill the section. Displace to 8.7 ppg Quikdriln mud system. Drill ahead as per directional plan to TD. Circ and clean hole to run slotted liner. 8. RIH with 4 ~/2", L-80, 12.6# slotted liner. Set hgr/pkr + 150' above the 7" shoe. Drop neutral weight ball, set pkr. Test packer on annulus 3500 psi for 30 mins. Release from packer, pressure up and shear out seat. Circ until clean seawater. POOH lay down DP. 9. RIH with 4 1/2" L~80 completion with SSSV, 3 GLM's and 7" production packer with standard EOA tailpipe assy. Circulate corrosion treated seawater into the annulus. Set packer and test tubing to 4000 psi for 30 minutes. Bleed off tubing pressure to 2000 psi after test, pressure up annulus to 3500 psi for 30 minute test. Follow RP for Running Tubing 10. Set BPV and test. ND BOPE. NU tubing head adapter and tree. Test tree to 5000 psi.. Pull BPV. Freeze protect through shear valve in top GLM. Set BPV and test. 11. Release rig to K pad. Prepared by: /~~~~~'~ ~/~ ~/~'~ Drilling Engineer Date Approved by: ,/ Date Drilling Superintendent Date 13-02L Sag River Produce, Whipstock 7" liner top ~ 1,000' MD I SSSV ~2,23,'M0 I 4-1/2% 12.6#, L-80 Tubing EZSV Brldgeplug ~ 3,450' MD I 7" scab liner set {{ 3,460'MD I Original KB. ELEV = 72.80' BF. ELEV = 44.9" Hanger Type: FMC Gert I Placement of (3) 4 1/2" x 1" GLM's will be determined after log evaluations 4-1/2% 12.6#, L-80 Tubing cement plug back 9,026' to 8,500' :: :::.::::::::::: :::: ::::::::::::::::::::::::: :i :i::: :::::::::::::::::::::::::::::::::::::::: 9 5/8% L-80, 47#, BTC ~Set @ 8,500' / ~ 7" Baker Prod. Pkr. set at @19,813' MD I 'xn' nipple . ~ 7", liner shoe ~ 10,022' MD I Perfs P & A 7" 29# L-80 BTC-Mod I10'298' MD I 7" x 4 1/2" hanger pkr set @19,872' TSAG 4 1/2" Slotted Liner to TD ~ 12,800" MO ] DATE tEV-BY / 12/15/97 lB. Kaluz1 03-12-98 /B. ,a,.z~ / COMMENTS Sidetrack to Sag River Horz. Prod. Revised for new wellbore Revised a new wellbore PRUDHOE BAY UNIT WELL: 13-02B APl NO: 50-029-20324-01 SEC 13, T. 10N., R.14 E. BP Exploration (Alaska/ 3RILL, lNG SERVICES Shared Services Drilling 13-02B ST Wp3 I DrillQuest' 4000 ¢1oo.oo 5000 6000 7000 8000 9000 OP · Start Dir @ 2.500°/100ft · 3430.00ft MD, 3429.99ft TVD SVI - 3901.30 TVD TGNU - 4529.30 TVD Dir, Sail @ 39.750° · 5029.41ft MD, 4904.89ft TVD UGNU (S) - 5431.30 TVD "-~ W-F~ SAK . 6260.30 TVD - - --~~:s~-7-g~: 6319.30 red Proposal Data for 13--02B St Wp3 Verbcal C:n'~n: Well Horizontal Odg~n: Well M~surement Unh. s:t~ Nor~ Reference: True Nor~ Dogk~ Severity: Degrees per 1eof1 Verl~al Sec'don Azimuth: 69,720' Vert~al S~c'6on Deacfipt~on:Well Vertical Sec'don Oran: 0.00 N,0,O0 E Measured Ind. Azim. Ve~cal Norl~lnge Eaating~ Vet'tlc:al I~:~teg Del>Ua Depbh Secticm Ram ~43~3.00 0.246 238.373 3429.99 1.59 $ 0.24 E -0.33 5029.41 39.750 41.750 49~4.89 39432 N 352-23 £ 467.07 2.500 9605.79 39.750 41.750 S423.4~ 257752 N 2300.Sl E 3051.57 0.000 9744.44 39.750 41.750 8530.00 2643.66 N 2359.g4 E 3129.$7 0.000 10012.06 44.000 72.103 8731.30 2737.06 N 2506.85 E 3300.14 7.679 10012.06 44.000 72.103 8738.49 273920 N 2513.46 E 3307.08 0.000 10052.06 44.000 72.103 8760.07 2745.60 N 2533.29 £ 3327.90 0.000 10192,42 100,145 72.103 8801.57 2785.02 N 265535 £ 34~6.06 4~.OOO 1050331 100,145 72.103 8746.81 2879.0~ N 2~46.~8 £ 3761.83 0,000 10659.88 91.117 92,197 8731.30 2900.00 N 3t00.00 £ 3912.99 14,00~ 10659.88 91,117 92.197 873130 2900.00 N 3100.00 £ 3913.00 14.('~ 11290.63 91.117 92.197 8719.00 2878.82 N 3730.16 £ 4495.71 0~ ~,~ 11354.39 90.146 99.787 8718.30 2869.17 N 3793.52 E 4552.g4 1.i Into3.t~ ~0.146 09.787 8711.30 2401.s4 lq 6.~.T/E 693:.16 0.00O SURFACE LOCATION REFERENCE PLOT DATE: 27 - Mar - 1998 Horizontal Coordinates: 5932237.63 N, 687178.80 E RKB Elevation: 35.30 ft Rig (EST) 46.00 ft Well (CBE) 81.30 ft RKB- AMSL Coordinate System: NAD27 Alaska State Planes, Zone 4, US Foot Created By: ~ C#..% '/'to C heckedBy: ,/r/,~ /,v/ Proposal T rget Surr ry Target Name: TVDss: TVDrkb: WcllbeM Offsets: Global Coordinates: 13-02B Target 1 8650.00 8731.30 TVD 2900,00 N, 3100.00 E 5935036.00 N, 689648.00 E 13-02B Target 2 8637.00 8718.30 TVD 2869.17 N, 3793.52 E 5935200.00 N, 690900.00 E 13-02B Target 3 8630.00 8711.30 TVD 2401.84 N, 6502.77 E 5934800.00 N, 693620.00 E Scale: linch = 100Oft I ~oooo.o~" Casing 10022.06 MD t3-028 Target 8738.49 TVD 8781~50 2900.OO/~. 3 t~.~ I 3000 rH,~z . 8 ] 082¢0-~'d BHRZ. 8272730 TVD K I N G A K ( B ) -- '~'~07 f O'~7'E~ 13-025 Target 8718-30 TVD 2809.1 7 IV. 3 7~3.~2 I .~nfM'l 13-02B St Wp3 I 6000 4 1/2" Uner/TD 14103.65 MD 8711.30 TVD , _ _ K/NCtAK~-_8252d.20 red TSAG . 8731.30 ~VD 13-028 Target 3 87I 1.30 Tiro 2,I01.8,I ~. 6502.77 E I 7000 Shared Services Drilling DrillQuest' 13-02B ST Wp3 SURFACE LOCATION REFERENCE iHerb:entel Coordinates: 5932237.63 N, 687178.80 E RKB Elevation: 35.30 fi Rig (EST) 46.00 ft Well (CBE) 81.30 ft RKB - AMSL Coordinate System: NAD27 Alaska State Planes, Zone 4. US Foot Proposal' Target PLOT DATE: 27 - Mar - 1998 Created By: ~'~. ~-$,' Checked By: Approved By: ~um Target Nan'~: TVDss: 'I"VD~b: WclIJ~ead Offset~: Global Coordinams: I3--~-B Target 1 8650.00 8731.30 TVD 2900.00 N, 3100.00 E 13.-02B Target 2 8637.00 8718.30TVD 2869.17 N, 3793.52 E 13-02B Target 3 8630.00 8711.30 'I'VD 2401,84 N, 6502.77 E 5935036.00 N, 689648.00 E 5935200,00 N, 690900,00 E 5934800.00 N, 693620.1)0 E t 3-O2B Tm'lief t 3-021~ Target t 8118.30 3200 Scale: linch = 80Oft 7' Casing 10022.06 MD 8738.49 TVD 8722,72 Proposal Data for 13.-02B St Wp3 Vertical Origin: Weft HoriZontal Ol'igm:Well Measurement Uni1~:~ North Reference: TnJe Nor~ Dogleg Severity: De~'ees per '~ 0Ott Vm'lk~l Sec6on Azimu~: 69.720' Verl~cal Sectkm Description:Well Vecdcal Section Odgin: 0.00 N,0.00 E Mea,ur~:l Inc{. AzJm. Vertical Northing,, Easting= Vartic:~l Do~i,eg 3430.00 0.246 238.373 3429.99 1.59 S 0.24 E -0.33 5029.41 39.750 41.750 4904.89 39432 N 352.23 E ~67.07 2_500 9605.79 39.750 41,750 8.123.40 257752 N 2300.81 E 3051.37 0.0o0 97~1,.~A39.750 41.750 8530.00 2643.66 N 2359.M, E 3129.~7 0.ooo 10012.0644,000 72.103 8731.30 2737,06 N 2506.85 E 3300.14 7.679 10022,0644.000 72.103 8738,49 273920 N 2513,46 £ 330?.08 0.000 10052,0644,000 72,103 8760,07 2745,60 N 2533,29 E 3327.90 0.003 10192,42100,14572,103 8801,37 2?85,02 N 26~5.35 E 3456,06 40,000 10~03.31100.14572.103 8746,81 2,{79.06 N 2946.58 £ 3761,13 0,0OO 1065938 91.117 92.197 8731.30 2900.00 N 3100.00 £ 3912,99 14.000 10659,{i$ 91,117 92.197 8731.30 2900.00 N 3100,00 E 3913.00 14.000 11290,6391.117 92,197 8719,00 2~75.82 N 3730,16£ 4.495,? l 000~ 11354,3990,146 99,787 8718,30 2869,17 N 3793.52 £ 4552,S4 12.0d 14103,6590,146 99,787 871130 2401,84 N 6502,77 £ 6932.16 0.0, 13-02B Tcu,'get 3 8711.~ lr~ 2401.84 ~. 0,502. 3200 2400 ,.~1600 O z 800 7800.00 5300.00 i800.00 5300.00 ~800.00 Dir, Sail @ 39.750° ' 5029.41ft MD, 4904.89ft TVD 4 1/2' 1410: 8711.30 .31 24O0 .~6oo .=_ 800 : Start Dir @ 2.500°/100ft: 3430.00ft MD, 3429.99ft TVD I I I 0 8O0 1600 24OO Scale: 'linch = 800ft I I I 3200 4000 4800 Eastings I 5600 6400 Reference is True North Prudhoe Bay Unit Measured Sub-Sea Vedical Depth Incl. Azim. Depth Depth (~) (~) (~) 3430.00 0.246 238.373 3348.69 3429.99 3500.00 1.516 39.192 3418.69 3499.99 3600.00 4.015 40.838 3518.56 3599.86 3700,00 6.515 41.222 3618.13 3699.43 3800.00 9.015 41.393 3717.21 3798.51 3900.00 11.515 41.491 3815.60 3896.90 3904.49 11,627 41.494 3820.00 3901.30 4000.00 14.015 41.554 3913.12 3994.42 4100.00 16.515 41.598 4009.59 4090.89 4200.00 19.015 41.631 4104.81 4186.11 4300.00 21,515 41.657 4198.61 4279,91 4400.00 24.015 41,677 4290.82 4372,12 4500.00 26.515 41,694 4381.24 4462.54 4575.23 28.396 41.705 4448.00 4529.30 4600.00 29.015 41.708 4469.72 4551.02 4700.00 31.515 41.720 4556.09 4637,39 4800.00 34.015 41.730 4640.17 4721.47 4900.00 36.515 41,740 4721,81 4803.11 5000.00 39.015 41.748 4800.86 4882,16 5029.41 39.750 41.750 4823,59 4904.89 5100.00 39.750 41.750 4877,86 4959,16 5200.00 39.750 41.750 4954,75 5036.05 5300.00 39.750 41.750 5031.63 5112.93 5400.00 39.750 41.750 5108,52 5189.82 5500.00 39.750 41,750 5185.40 5266.70 5600.00 39,750 41.750 5262.28 5343.58 5700.00 39.750 41.750 5339,17 5420.47 5714.09 39.750 41.750 5350.00 5431.30 5800.00 39.750 41.750 5416.05 5497.35 5900.00 39.750 41.750 5492.94 5574.24 Sperry-Sun Drilling Services Proposal Report for 13-02B D14 - 13-02B St Wp3 Alaska State Plane Zone 4 PBU_EOA DS 13 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (fi) 1.59 S 0.24 E 5932236.05 N 687179.08 E 0.95 S 0.69 E 5932236.70 N 687179.52 E 2,72 N 3.82 E 5932240.45 N 687182.55 E 9.64N 9,85 E 5932247.51 N 687188.41 E 19.79 N 18.77 E 5932257.88 N 687197.07 E 33.14 N 30.56 E 5932271.52 N 687208.53 E 33.82 N 31.16 E 5932272.21N 687209.11E 49,68 N 45.21 E 5932288,42 N 687222.76 E 69,38 N 62.68 E 5932308.54 N 687239,74 E 92.19 N 82.94 E 5932331.84 N 687259.43 E 118.07 N 105.96 E 5932358.29 N 687281.80 E 146.97 N 131.68 E 5932387.82 N 687306.79 E 178.84 N 160,06 E 5932420.38 N 687334.38 E 204.74 N 183.14 E 5932446.85 N 687356.80 E 213.62 N 191.05 E 5932455,92 N 687364.49 E 251.24 N 224,58 E 5932494.36 N 687397.08 E 291.63 N 260.60 E 5932535.63 N 687432.09 E 334.71N 299.03 E 5932579.65 N 687469.44 E 380.40 N 339.80 E 5932626.34 N 687509.06 E 394.32 N 352.23 E 5932640.56 N 687521.14 E 427.99 N 382.28 E 5932674.97 N 667550.35 E 475,70 N 424,86 E 5932723.72 N 687591.74 E 523.41 N 467.44 E 5932772.47 N 687633.12 E 571.11 N 510.02 E 5932821.21 N 687674.50 E 618.82 N 552.60 E 5932869.96 N 687715.88 E 666.52 N 595.18 E 5932918.71 N 687757.27 E 714,23 N 637.76 E 5932967.46 N 687798.65 E 720.95 N 643.76 E 5932974.32 N 687804.48 E 761.93 N 680,34 E 5933016.20 N 687840.03 E 809.64 N 722.92 E 5933064,95 N 687881.42 E Dogleg Vedical Rate Section (°/100fl) (fi) -0.33 2.500 0.32 2.500 4.53 2.500 12.58 2.500 24.46 2.500 40.16 2.500 40.95 2.500 59.63 2.500 82.84 2.500 109.75 2.500 140.31 2.500 174.46 2.500 212.13 2.500 242.75 2.500 253.25 2.500 297.74 2.500 345.52 2.500 396.51 2.500 450.59 2.500 467.07 0.000 506.93 0.000 563.41 0.000 619.88 0.000 676.36 0.000 732.83 0.000 789.31 0.000 845.78 0.000 853.74 0.000 902.26 0.000 958.73 Comment KOP: Start Dir @ 2.500°/100ft: 3430.00fl MD, 3429.99ft TVD SVl TGNU End Dir, Sail @ 39.750°: 5029.41ft MD, 4904.89ft TVD UGNU (S) Continued... DrillQuest 26 March, 1998 - 17:27 - I - Sperry-Sun rilling Services Proposal Report for 13-02B D14 - 13-02B St Wp3 Prudhoe Bay Unit Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth Nothings (~) (~) (~) (~) 6000.00 39.750 41.750 5569.82 5651.12 857.35 N 6100.00 39.750 41.750 5646.71 5728.01 905.05 N 6200.00 39.750 41.750 5723.59 5804.89 952.76 N 6300.00 39.750 41.750 5800.47 5881.77 1000.46 N 6400.00 39.750 41.750 5877.36 5958.66 1048.17 N 6500.00 39.750 41.750 5954.24 6035,54 1095.88 N 6600.00 39.750 41.750 6031.13 6112.43 1143.58 N 6700.00 39.750 41,750 6108.01 6189.31 1191.29 N 6792.33 39.750 41.750 6179.00 6260.30 1235.33 N 6800.00 39.750 41.750 6184.89 6266.19 1238.99 N 6900.00 39.750 41.750 6261.78 6343.08 1286.70 N 7000.00 39.750 41.750 6338.66 6419.96 1334.40 N 7100.00 39.750 41.750 6415.55 6496.85 1382,11N 7129.20 39.750 41.750 6438.00 6519.30 1396,04 N 7200.00 39.750 41.750 6492.43 6573.73 1429.82 N 7300.00 39.750 41.750 6569.32 6650.62 1477.52 N 7400.00 39.750 41.750 6646,20 6727.50 1525.23 N 7500.00 39.750 41.750 6723.08 6804.38 1572.93 N 7600,00 39.750 41.750 6799.97 6881.27 1620.64 N 7700.00 39.750 41.750 6876.85 6958,15 1668.35 N 7800.00 39.750 41.750 6953.74 7035.04 1716.05 N 7900,00 39.750 41.750 7030.62 7111.92 1763.76 N 8000.00 39.750 41.750 7107.51 7188.81 1811.46 N 8100.00 39.750 41.750 7184.39 7265.69 1859.17 N 8200.00 39.750 41.750 7261,27 7342.57 1906.87 N 8300.00 39.750 41.750 7338.16 7419,46 1954.58 N 8400.00 39.750 41.750 7415.04 7496.34 2002.29 N 8500.00 39.750 41.750 7491.93 7573.23 2049.99 N 8600.00 39.750 41.750 7568.81 7650,11 2097.70 N 8700,00 39.750 41.750 7645.69 7726.99 2145.40 N Local Coordinates Global Coordinates Dogleg Ve~ical Eastings Nodhings Eastings Rate Section (fl) (~) (fl) (°/100fi) 765.50 E 5933113.70 N 687922.80 E 0.000 1015.21 808.07 E 5933162.44 N 687964.18 E 0.000 1071.68 850.65 E 5933211,19 N 688005.56 E 0.000 1128.16 893.23 E 5933259.94 N 688046.95 E 0.000 1184.63 935.81 E 5933308.69 N 688088.33 E 0.000 1241.11 978.39 E 5933357.43 N 688129.71 E 0.000 1297.58 1020.97 E 5933406.18 N 688171.10 E 0.000 1354.05 1063.55 E 5933454.93 N 688212.48 E 0.000 1410.53 1102.86 E 5933499.94 N 688250.69 E 0.000 1462.67 1106.13 E 5933503.67 N 688253.86 E 0.000 1467.00 1148.71 E 5933552.42 N 688295.24 E 0.000 1523.48 1191.29 E 5933601.17 N 688336.63 E 0.000 1579.95 1233.87 E 5933649.92 N 688378.01 E 0.000 1636.43 1246.30 E 5933664,15 N 688390.09 E 0.000 1652.92 1276.44 E 5933698.66 N 688419.39 E 0.000 1692.90 1319.02 E 5933747,41N 688460.78 E 0.000 1749.38 1361.60 E 5933796.16 N 688502.16 E 0.000 1805.85 1404.18 E 5933844.90 N 688543.54 E 0.000 1862.33 1446.76 E 5933893.65 N 688584.92 E 0.000 1918.80 1489.34 E 5933942.40 N 688626.31 E 0.000 1975.28 1531.92 E 5933991.15 N 688667.69 E 0.000 2031.75 1574.50 E 5934039.89 N 688709.07 E 0.000 2088.23 1617.08 E 5934088.64 N 688750.45 E 0.000 2144,70 1659.66 E 5934137.39 N 688791.84 E 0.000 2201.18 1702.24 E 5934186.13 N 688833.22 E 0.000 2257.65 1744.81 E 5934234.88 N 688874,60 E 0.000 2314.13 1787.39 E 5934283,63 N 688915.99 E 0.000 2370.60 1829.97 E 5934332.38 N 688957.37 E 0.000 2427.08 1872.55 E 5934381.12 N 688998.75 E 0.000 2483.55 1915.13 E 5934429.87 N 689040.13 E 0.000 2540.03 Comment WEST SAK TSEABEE Alaska State Plane Zone 4 PBU_EOA DS 13 Continued,., 26 March, 1998 - 1 7:27 - 2 * DrillQuest Sperry-Sun Drilling Services Proposal Report for 13-02B D14 - 13-02B St Wp3 Prudhoe Bay Unit Measured Sub-Sea Vedical Depth Incl, Azim. Depth Depth Nodhings (~) (~) (~) (~) 8800.00 39.750 41.750 7722,58 7803,88 2193.11 N 8900.00 39.750 41.750 7799.46 7880.76 2240.81 N 9000.00 39.750 41.750 7876,35 7957.65 2288.52 N 9100.00 39.750 41.750 7953,23 8034.53 2336.23 N 9195.95 39.750 41.750 8027,00 8108.30 2382.00 N 9200.00 39.750 41.750 8030,12 8111,42 2383.93 N 9300.00 39,750 41,750 8107.00 8188.30 2431,64 N 9400.00 39.750 41.750 8183.88 8265.18 2479,34 N 9409.26 39.750 41.750 8191.00 8272.30 2483.76 N 9500.00 39.750 41.750 8260.77 8342,07 2527,05 N 9600.00 39.750 41.750 8337.65 8418.95 2574.76 N 9605.79 39.750 41.750 8342.10 8423.40 2577.52 N 9700,00 39,750 41,750 8414.54 8495.84 2622.46 N 9744.44 39.750 41.750 8448.70 8530.00 2643,66 N 9744.83 39.750 41.797 8449.00 8530,30 2643,85 N 9800.00 39.951 48.403 8491,38 8572.68 2668,77 N 9900.00 41.249 60.046 8567.41 8648,71 2706.60 N 9936.90 42.013 64.154 8595.00 8676.30 2718.06 N 10000.00 43.645 70.868 8641.30 8722,60 2734.41 N 10012.06 44.000 72.103 8650,00 8731.30 2737.06 N 10022.06 44.000 72.103 8657.19 8738.49 2739.20 N 10052.06 44~000 72.103 8678.77 8760.07 2745.60 N 10100,00 63.178 72.103 8707.10 8788.40 2757.40 N 10192.42 100.145 72,103 8720.27 8801.57 2785.02 N 10200.00 100.145 72.103 8718,93 8800.23 2787.31 N 10300.00 100,145 72.103 8701,32 8782.62 2817.56 N 10400.00 100.145 72.103 8683.70 8765.00 2847.81 N 10500,00 100.145 72.103 8666,09 8747.39 2878.06 N 10503.31 100.145 72.103 8665.51 8746.81 2879,06 N 10600,00 94.647 84.582 8653.01 8734.31 2898,33 N Local Coordinates Global Coordinates Dogleg Vedical Eastings Nodhings Eastings Rate Section (ft) (~) (~) (°/100~) (~) 1957.71E 5934478.62 N 689081.52 E 0,000 2596.50 2000.29 E 5934527.36 N 689122.90 E 0,000 2652.98 2042,87 E 5934576.11N 689164.28 E 0,000 2709.45 2085.45 E 5934624.86 N 689205.67 E 0,000 2765.93 2126.30 E 5934671.63 N 689245.37 E 0,000 2820.11 2128.03 E 5934673.60 N 689247.05 E 0,000 2822.40 2170.61E 5934722.35 N 689288.43 E 0,000 2878.88 2213.18 E 5934771.10 N 689329,81E 0,000 2935.35 2217.13 E 5934775.61N 689333.65 E 0,000 2940.58 2255.76 E 5934819.85 N 689371,20 E 0.000 2991.82 2298.34 E 5934868,59 N 689412.58 E 0,000 3048,30 2300.81 E 5934871.41 N 689414,97 E 0,000 3051.57 2340.92 E 5934917.34 N 689453.96 E 0,000 3104.77 2359.84 E 5934939.00 N 689472,35 E 0,000 3129.87 2360.01 E 5934939,19 N 689472.51 E 7.679 3130.09 2385.02 E 5934964,73 N 689496.90 E 7,679 3162,19 2437.68 E 5935003.85 N 689548.60 E 7,679 3224,70 2459.34 E 5935015.85 N 689569,97 E 7,679 3248,98 2498,93 E 5935033.18 N 689609.15 E 7,679 3291,80 2506.85 E 5935036.02 N 689617,00 E 7,679 3300.14 2513.46 E 5935038.32 N 689623.55 E 0.000 3307.08 2533.29 E 5935048.22 N 689643,22 E 0.000 3327.90 2569.84 E 5935057.92 N 689679,46 E 40.000 3366,27 2655.35 E 5935087,65 N 689764,27 E 40,000 3456.08 2662.46 E 5935090,12 N 689771,31 E 0,000 3463.52 2756.13 E 5935122.68 N 689864.20 E 0.000 3561,87 2849.80 E 5935155.24 N 689957,10 E 0,000 3660.22 2943,48 E 5935187,81 N 690049.99 E 0,000 3758.57 2946.58 E 5935188,88 N 690053.07 E 0,000 3761,83 3040.27 E 5935210,47 N 690146.25 E 14.000 3856.39 Alaska State Plane Zone 4 PBU_EOA DS 13 Comment THRZ BHRZ Start Dir @ 7.679°I100ft: 9744.44ft MD, 8530.00ft TVD KINGAK(B) KINGAK(A) End Dir, Sail @ 44,000°: 10012,06ft MD, 8731.30ft TVD 7" Casing Start Dir @ 40,000°/100ft: 10052.06ft MD, 8760.07ft TVD End Dir, Sail @ 100.145": 10192.42ft MD, 8801.57ft TVD Start Dir @ 14.000°I100ft: 10503.31ft MD, 8746.81ft TVD Continued.., -3- DrillQuest Prudhoe Bay Unit Measured Depth Incl. (ft) 10659.88 91.117 10700.00 91.117 10800.00 91.117 10900.00 91.117 11000.00 91.117 11100.00 91.117 11200.00 91.117 11290.63 91.117 11300.00 90.975 11354.39 90.146 Azim. 92.197 92.197 92.197 92.197 92.197 92.197 92.197 92.197 93.313 99.787 Sub-Sea Depth (~) 8650.00 8649.22 8647.27 8645.32 8643.37 8641.42 8639.47 8637.70 8637.53 8637.00 Vedical Depth (~) 8731.30 8730.52 8728.57 8726.62 8724.67 8722.72 8720.77 8719.00 8718.83 8718.30 11400.00 90.146 99.787 8636.88 8718.18 11500.00 90.146 99.787 8636.63 8717.93 11600.00 90.146 99.787 8636.37 8717.67 11700.00 90.146 99.787 8636.12 8717.42 11800.00 90.146 99.787 8635.87 8717.17 11900.00 90.146 99.787 8635.61 8716.91 12000.00 90.146 99.787 8635.36 8716.66 12100.00 90.146 99.787 8635.10 8716.40 12200.00 90.146 99.787 8634.85 8716.15 12300.00 90.146 99.787 8634.59 8715.89 12400.00 90.146 99.787 8634.34 8715.64 12500.00 90.146 99.787 8634.08 8715.38 12600.00 90.146 99.787 8633.83 8715.13 12700.00 90.146 99.787 8633.57 8714.87 12800.00 90.146 99.787 8633.32 8714.62 Sperry-Sun Drilling Services Proposal Report for 13-02B D14 - 13-02B St Wp3 Alaska State Plane Zone 4 PBU_EOA DS 13 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/~ 00ft) (ft) 2900.00 N 3100.00 E 5935213.62 N 690205.93 E 14.000 3912.99 2898.46 N 3140.08 E 5935213.08 N 690246.03 E 0.000 3950.06 2894.63 N 3239.99 E 5935211.72 N 690346.00 E 0.000 4042.44 2890.80 N 3339.89 E 5935210.37 N 690445.97 E 0.000 4134.83 2886.96 N 3439.80 E 5935209.01 N 690545.95 E 0.000 4227.21 2883.13 N 3539.71 E 5935207.66 N 690645.92 E 0.000 4319.60 2879.30 N 3639.62 E 5935206.30 N 690745.89 E 0.000 4411.98 2875.82 N 3730.16 E 5935205.08 N 690836.49 E 0.000 4495.71 2875.37 N 3739.52 E 5935204.86 N 690845.86 E 12.000 4504.34 2869.17 N 3793.52 E 5935200.00 N 690900.00 E 12.000 4552.84 2861.42 N 3838.47 E 5935193.36 N 690945,12 E 0.000 4592.31 2844.42 N 3937.01 E 5935178.81 N 691044.06 E 0,000 4678,86 2827.42 N 4035.56 E 5935164.27 N 691143,00 E 0.000 4765,40 2810,42 N 4134.10 E 5935149,72 N 691241,93 E 0.000 4851.95 2793.42 N 4232.65 E 5935135.17 N 691340.87 E 0,000 4938.49 2776,43 N 4331.19 E 5935120.62 N 691439,80 E 0,000 5025.03 2759.43 N 4429.74 E 5935106.07 N 691538.74 E 0,000 5111.58 2742.43 N 4528.28 E 5935091.52 N 691637.67 E 0.000 5198,12 2725.43 N 4626.82 E 5935076,97 N 691736,61 E 0.000 5284.66 2708.43 N 4725.37 E 5935062.42 N 691835.55 E 0.000 5371.21 2691.43 N 4823.91 E 5935047.87 N 691934,48 E 0.000 5457.75 2674,43 N 4922.46 E 5935033.32 N 692033.42 E 0,000 5544.30 2657.44 N 5021.00 E 5935018.77 N 692132,35 E 0~000 5630.84 2640.44 N 5119.55 E 5935004.22 N 692231.29 E 0,000 5717.38 2623.44 N 5218.09 E 5934989.67 N 692330,22 E 0.000 5803.93 Comment End Dir Sail @ 91.117°: 10659.88ft MD, 8731.30ft TVD Target: '13-02B Target 1, Geological Start Dir @ 12.000°/100ft: 11290.63ft MD, 8719.00ft TVD End Dir Sail @ 90.1460: 11354.39ft MD, 8718.30ft TVD Target: '13-02B Target 2, Geological Continued... 26 March, 1998- 17:28 -4- DrillQuest Sperry-Sun Drilling Services Proposal Report for 13-02B D14 - 13-02B St Wp3 Prudhoe Bay Unit Measured Sub-Sea Vedical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Nodhings Eastings Nodhings Eastings (ft) (fi) (fi) (~) (~) (~) (~) 12900.00 90.146 99.787 8633.06 8714.36 2606.44 N 5316.63 E 5934975.12 N 692429.16 E 13000,00 90.146 99.787 8632.81 8714.11 2589.44 N 5415.18 E 5934960.57 N 692528.09 E 13100.00 90.146 99.787 8632.56 8713.86 2572.44 N 5513.72 E 5934946.03 N 692627.03 E 13200.00 90.146 99.787 8632.30 8713.60 2555.45 N 5612.27 E 5934931.48 N 692725,97 E 13300.00 90.146 99.787 8632.05 8713.35 2538.45 N 5710.81E 5934916.93 N 692824.90 E 13400.00 90.146 99.787 8631.79 8713.09 2521.45 N 5809.36 E 5934902.38 N 692923.84 E 13500.00 90.146 99,787 8631.54 8712.84 2504.45 N 5907.90 E 5934887.83 N 693022.77 E 13600.00 90.146 99.787 8631.28 8712.58 2487.45 N 6006.44 E 5934873.28 N 693121.71E 13700.00 90.146 99.787 8631.03 8712.33 2470.46 N 6104.99 E 5934858.73 N 693220.64 E 13800.00 90.146 99.787 8630.77 8712.07 2453.45 N 6203.53 E 5934844.18 N 693319.58 E 13900.00 90.146 99.787 8630.52 8711.82 2436.46 N 6302.08 E 5934829.83 N 693418.51E 14000.00 90.146 99.787 863O.26 8711.56 2419.46 N 6400.62 E 5934815.08 N 693517.45 E 14100.00 90.146 99.787 8630.01 8711.31 2402.46 N 6499.17 E 5934800,53 N 693616.39 E 14103.65 90.146 99.787 8630.00 8711.30 2401.84 N 6502.77 E 5934800.00 N 693620.00 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 69.720° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14103.65ft., The Bottom Hole Displacement is 6932.16ft., in the Direction of 69.728° (True). Dogleg Vertical Rate Section (°/~00ft) (ft) 0.000 5890.47 0.000 5977.01 0.000 6063.56 0.000 6150.10 0.000 6236.65 0.000 6323.19 0.000 6409.73 0.000 6496.28 0.000 6582.82 0.000 6669.36 0.000 6755.91 0.000 6842.45 0.000 6929.00 0.000 6932.16 Comment Total Depth: 14103.65ft MD, 8711.30fl TVD 4 1/2" Liher Target: 13-02B Target 3, Geological Alaska State Plane Zone 4 PBU_EOA DS 13 26 March, 1998 - 17:28 - 5 - DrillQuest Sperry-Sun Drilling Services Proposal Report for 13-02B D14 - 13-02B St Wp3 Prudhoe Bay Unit Measured Vedical Depth Incl. Azim. Depth Nodhings Eastings 3430.00 0.246 238.373 3429.99 1.59 S 0.24 E 5029.41 39.750 41.750 4904.89 394.32 N 352.23 E 9605.79 39.750 41.750 8423.40 2577.52 N 2300.81E 9744.44 39.750 41.750 8530.00 2643.66 N 2359.84 E 10012.06 44.000 72.103 8731.30 2737.06 N 2506.85 E 10022.06 44.000 72.103 8738.49 2739.20 N 2513.46 E 10052.06 44.000 72.103 8760.07 2745.60 N 2533.29 E 10192.42 100.145 72.103 8801.57 2785.02 N 2655.35 E 10503.31 100.145 72.103 8746.81 2879.06 N 2946.58 E 10659.88 91.117 92.197 8731.30 2900.00 N 3100.00 E 11290.63 91.117 92.197 8719.00 2875.82 N 3730.16 E 11354.39 90.146 99.787 8718.30 2869.17 N 3793.52 E 14103.65 90.146 99.787 8711.30 2401.84 N 6502.77 E All data is in feet unless otherwise stated. Directions and coordinates are relative to Vertical depths are relative to Well. Norlhings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 69.720° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14103.65ft., The Bottom Hole Displacement is 6932.16ft., in the Direction of 69.728° (True). Alaska State Plane Zone 4 PBU_EOA DS 13 Vertical Dogleg Section Rate (fi) (°/100fi) -0.33 467.o7 2.500 3051.57 0.000 3129.87 0.000 3300.14 7.679 3307.08 0.000 3327.90 0.000 3456.06 40.000 3761.83 0.000 3912.99 14.000 4495.71 0.000 4552.84 12.000 6932.16 0.000 True North. Comments Measured Station Coordinates Depth TVD NoHhings Eastings (fi) (it) (it) (fi) 3430.00 3429.99 1.59 S 0.24 E 5029.41 4904.89 394.32 N 352.23 E 9744.44 8530.00 2643.66 N 2359.84 E 10012.06 8731.30 2737.06 N 2506.85 E 10O52.06 8760.07 2745.60 N 2533.29 E 10192.42 8801.57 2785.02 N 2655.35 E 10503.31 8746.81 2879.06 N 2946.58 E 10659.88 8731.30 2900.00 N 3100.00 E 11290.63 8719.00 2875.82 N 3730.16 E 11354.39 8718.30 2869.17 N . 3793.52 E 14103.65 8711.30 2401.84 N 6502.77 E Comment KOP: Start Dir @ 2.500°/100tt: 3430.00ft MD, 3429.99tt TVD End Dir, Sail @ 39.750°: 5029.41ft MD, 4904.89ft TVD Start Dir @ 7.679°/100ft: 9744.44ft MD, 8530.00ft TVD End Dir, Sail @ 44.000°: 10012.06ft MD, 8731.30ft TVD Start Dir @ 40.000°/100ft: 10052.06ft MD, 8760.07ft TVD End Dir, Sail @ 100.145°: 10192.42ft MD, 8801.57ft TVD Start Dir @ 14.000°/100ft: 10503.31ft MD, 8746.81ft TVD End Dir, Sail @ 91.117°: 10659.88ft MD, 8731.30ft TVD Stad Dir @ 12.000°/100ft: 11290.63ft MD, 8719.00ft TVD End Dir, Sail @ 90.146°: 11354.39ft MD, 8718.30ft TVD Total Depth: 14103.65ft MD, 8711.30ft TVD Formation Tops Measured Vertical Sub-Sea Depth Depth Depth Northings Eastings Formation Name (it) (ft) (it) (ft) (it) 3904.49 3901.30 3820.00 33.82 N 31.16 E SVl 4575.23 4529.30 4448.00 204.74 N 183.14 E TGNU 5714.09 5431.30 5350.00 720.95 N 643.76 E UGNU (S) 6792.33 6260.30 6179.00 1235.33 N 1102.86 E WEST SAK 7129.20 6519.30 6438.00 1396.04 N 1246.30 E TSEAI3EE 9195.95 8108.30 8027.00 2382.00 N 2126.30 E THRZ 9409.26 8272.30 8191.00 2483.76 N 2217.13 E BHRZ 9744.83 8530.30 8449.00 2643.85 N 2360.01 E KINGAK(B) 9936.90 8676.30 8595.00 2718.06 N 2459.34 E KINGAK(A) __ 26 March, 1998 - I7:28 -1- Continued... DrillQuest Sperry-Sb-n Drilling Services Proposal Report for 13-02B D14 - 13-02B St Wp3 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_EOA DS 13 Casing details From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 3430.00 3429.99 10022.06 8738.49 <Surface> <Su r~ace> 14103.65 8711.30 Casing Detail 7" Casing 4 1/2' Liner Targets associated with this wellpath Target Name 13-02B Targel 1 13-02B Target 2 13-02B Target 3 Target Entry Coordinates TVD Northings Eastings Target (ft) (ft) (ft) Shape 8731.30 2900.00 N 3100.00 E Point 8718.30 2869.17 N 3793.52 E Point 8711.30 2401.84 N 6502.77 E Point Target Type Geological Geological Geological 26 March, 1998 - 17:28 - 2 - DrillQuest BP EXPLORATION To: Blair Wondzell Date: March 26, 1998 From: Bob Kaluza, ODE, SSD MB 8-1 Subject: Well Plan_Revision, .DS 13-02B On 03/19/98, Doyen rlg 14 moved on Well 13-02B. The well had been 'Shutdown of Well Operations' on 03/17/98 due a contractual agreement that Doyen dg 141 would leave PBU field to ddll at the Alpine field. Prior to rig 141 leaving for Alpine, a cement plug was set in the sidetracked wellbore 25' below the 7" casing window at +. 9,200' MD. 3,000' of 4 1/a" tubing was hung below a tubing hanger and a dry hole cap was installed on top of the welt prior to shutdown. When Doyen rig 14 arrived, the 4 1/2" tubing was pulled and a directional ddiling assembly RIH to re-enter the sidetrack and drill off the cement plug through the Kingak formation to the original Sag River target. After ddlling 130' of the Kingak the shale packed off (as it had 375' into the original sidetrack wellbore). The pipe was worked free, but it was decided to move up hole +_ 150', set another whipstock, mill a new window, displace the well to 11 ppg, Oil Base Mud, and drill a new wellbore to the original Sag River target, After drilling 324' of new 6' hole out of the new window (48° to 80= inclination) the Kingak shale once again packed off the drill string. The pipe was worked free but could not drill back to bottom (TD _ 9,362' MD, window at ;I; 9,038'). A 6" fixed blade hole opener with rotating assembly was RIH but, it too, could not open the hole back to bottom. A 20 bbl, 15.8 ppg, Class 'G' cement plug was set in the open 7" c~sing from 9,026' to 8;500'. The plan ahead is to safely displace the oil base mud out of the hole. Set an EZSV plug +_ 3,400', set a 9 5/8" Whipstock on top of the EZSV, mill a new window through the casing into the SV1 formation, directionally ddll to the original target in the Sag River. The plan is to drill the Kingak at 40° - 44~ inclination rather than 85° (we have learned that the Kingak Shale [s mechanically unstable under DS 13). Set 7" liner in TSAG, short radius drill to the original target polygon of the Sag River formation. Dnlhng Engineer Date by: . Dnlh_ngCEn¢~neer Date 97-' ~.5"$ BP EXPLORATION To: From: Subject: Blair WondT_eil Bob Kaluza, ODE, SSD MB Well Plan Revision, _DS 13-02B. Date: March 26, 1998 On 03/19/98, Doyon dg 14 moved on Well 13-02B. The well had been 'Shutdown of Well Operations' on 0,3/17/98 due a contractual agreement that Doyon rig 141 would leave PBU field to drill at the Alpine field. Prior to rig 141 leaving for Alpine, a cement plug was set in the sidetracked wellbore 25' below the 7" casing window at ~ 9,200' MD. 3,000' of 41/a" tubing was hung below a tubing hanger and a dry hole cap was installed on top of the well pdor to shutdown. When Doyon rig 14 arrived, the 41/2" tubing was pulled and a directional ddlling assembly RIH to re-enter the sidetrack and drill off the cement plug through the Kingak formation to the original Sag River target. After drilling 130' of the Kingak the shale packed off (as it had 375' into the odginal sidetrack wellbore). The pipe was worked free, but it was decided to move up hole +_ 150', set another whipstock, mill a new window, displace the well to 11 ppg, Oil Base Mud, and drill a new wellbore to the original Sag River target. After drilling 324' of new 6" hole out of the new window (450 to 80° inclination) the Kingak shale once again packed off the drill string, The pipe was worked free but could not ddll back to bottom (TD ± 9,362' MD, window at ± 9,038'). A 6" fixed blade hole opener with rotating assembly was RIH but, it too, could not open the hole back to bottom. A 20 bbl, 15.8 ppg, Class 'G' cement plug was set in the open 7" ca. sing from 9,026' to 8;500'. The plan ahead is to safely displace the oil base mud out of the hole. ,Set an EZSV plug +_ 3,400', set a 9 5/8" Whipstock on top of the EZSV, mill a new window through the casing into the SV1 formation, directionally drill to the original target in the Sag River. The plan is to drill the Kingak at 40° - 44~ inclination rather than 85° (we have learned that the Kingak Shale [$ mechanically unstable under DS 13). Set 7" liner in TSAQ, short radius drill to the original target polygon of the Sag River formation. Approved by: Drilling Engineer ~' Date Date 13-02B Sag RiVer Producer Original KB. ELEV -- 72.80' BF. ELEV -- 44,9" Hanger Type: FMC Gan I 13-3/8, 72# L-8.0 I~TR$ 12,741'NID I SggV @2,231'MD 9 5/8'. L-SO, 47#, BTC ;;et @ $,5013' scab liner set @ 3,460'MD 4-1/2", 12,6#, L-BO Tubing 7" Baker Prod. Pkr- set at @ 8,978' MD 7" x 9 5/8" Hngr/Pkr set at @ 9,050' MD Seu-tion @ 9,175' MD ~ Ki=k off plug @ 9~200' MD EZSV Brldgeplug @ 7,000' ,~~ 27/8" ~toTD @ 14,530' MD 4 1/2", liner shoe @ 40,71~;' MD 3 112" tbg. =ut at @ 9,460' MD Perfs P & A 7" 29# L-80 BTC-Mod L10,296' MD DATE 12_/15/97 03-12-98 REV, BY -- B. K~luz~, .... B. Kaluz;~ I -- COMMENTS II Sidetrack to Sag River Hor'z.l~rod, Revised for new wellbore ii _ PRUDHOE BAY,,UNIT _WELL: ! 3-02B BP Exploration (Alaska) MEMORANDUM TO: David Jean, Chairma~ State of Alaska Alaska Oil and Gas Conservation Commission DATE: March 19, 1998 THRU: Blair Wondzell, G~ FILE NO: .DOC P. I. Supervisor FROM: Larry Wade~ SUBJECT: Petroleum Ihspec~br BOP Test Doyon 14 PBU DS 13-02B PTD 97-253 March.19~1998: I drove to DS-13 to witness a BOP test on Doyon 14. They had moved onto a well that Doyon 141 had been working on prior to leaving the field. The test went well except for the time it took in the middle of the test to pull the back pressure valve so they could torque up and test the kelly and floor valves. All the valves and lines seemed to be in good working order and the crew seemed to be fairly experienced even though they had a neW~-ool pusher and driller. SUMMARY: Witnessed a BOP test on Doyon 14. 0 failures, Attachments: agggcsfe.xIs cc; NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workov er: ~ DATE: March 19,1998 Doyon Rig No. 14 PTD # 97-253 Rig Ph.# 659-4510 ARCO Rep.: Dave Reid DS 13-02B Rig Rep.' 7" Set @ 9175' Location: Sec. '/4 T. '/ON R. X Weekly Other Test Pressures Ken Harding 14 Meridian Umiat Test MISC. INSPECTIONS: Location Gen.: ok Well Sign X Housekeeping: ok (Gen) Drl. Rig X PTD On Location X Standing Order Posted Hazard Sec. X FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly /IBOP Ball Type Inside BOP Quan. 1 ., 1 .... 1 Pressure P/F 500-5000 !P 500-5000 500-5000 , P 500-5000 P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. I 500/3500 500-5000 500-5000 500-5000 500-5000 2 500-5000 2 500-5000 n/a 0 P/F P P P P MUD SYSTEM: Visual Alarm Trip Tank X X Pit Level Indicators X X Flow Indicator X X Meth Gas Detector X X H2S Gas Detector X X CHOKE MANIFOLD: No. Valves '/5 .. No. Flanges 38 ., Manual Chokes Hydraulic Chokes Test Pressure 500-5000 500-5000 Funcb'oned Functioned P/F ! , , ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained Aff~'--Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 4 ~ 2400 3000 t 1750 , minutes 33 sec. minutes 43 sec. X Remote: X Psig. Number of Failures: 0 ,TestTime: 3.5 Hours. Number of valves tested 23 Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 I I I REMARKS: Distribution: odg-Well File c - Oper./Rig c - Database c - Trip Rpt File c -Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Larry Wade F1-0'21L (Rev. 12/94) agggcsfe.xls 3/4/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie NO. 12395 Companl Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy LIS Well Job # Log Description Date BL Sepia Disk Tape D.S. 7-08A 1~ 99093 MCNL "~ ~ <~ °t O 990204 1 I 1 D.S. 14-04A 99068 MCNL'~ ~ <~ 990102 I 1 1 D.S. 15-11A ~ 99092 MCNL ,¢r.-.~O'~O 990206 I 1 1 L2-11 99091 GR/CCL (PDC)-~ ~fl i 981202 1 D.S. 13-02B MEMORY GR/CCL/JEWELRY 990227 1 1 D.S. 13-02B MEMORY GPJCCL/DDL 990228 I I DATE: "'7, i'! 'I~:~;~~) Please sign and return one copy of this transmittal lo 5herrie at the above address or fax to (907) 5~2-~5~[C~8~ you, 04-Mar-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 13-02BPB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 9,089.50' MD 9,168.00' MD 9,965.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company DS 13-02BL1 drilling fluid change Subject: DS 13-02BL1 drilling fluid change Date: Fri, 5 Mar 1999 07:10:04 - 1000 From: "Stephen L Ward" <SWARD~mail.aai.arco.com> To: blair wondzell~admin.state.ak.us Blair-- Good Morning!! As we discussed over the phone yesterday, this e-mail is to inform you that on the above captioned well we will be changing the drilling fluid from the standard 8.9 ppg Flopro fluid to 8.5 ppg seawater. The reasons for this change is that a BHP measured inthis well on 2/28/99 showed a BHP of 1500 psi which is considerably less than the original presure of 3200 psi. This pressure yields a gradient of 3.3 ppg @ 8800' ss. Also in killing this well prior to running the whipstock assembly, the well would not hold a fluid column to the surface. We anticipate that we will drill the wel with fluid losses and therefore will continually pump down the CTx tubing annulus throughout the drilling and completion operation. If you have any questions, please call me at 265-1305 or e-mail me. Thanks, Steve Ward 1 of 1 3/15/99 1:45 PM Re: DS 13-02BL1 drilling fluid change Subject: Re: DS 13-02BL1 drilling fluid change Date: Fri, 05 Mar 1999 09:05:05 -0900 From: Blair Wondzell <Blair_Wondzell~admin.state.ak.us> Organization: SOA-AOGCC To: Stephen L Ward <SWARD~maihaai.arco.com> Steve, Good Morning! Thanks for the information. Nothing else is required. The ~pTD~is'~gT¥--~2~3. Thanks, Blair 3/5/99. Stephen L Ward wrote: > > Blair-- Good Morning! ! As we discussed over the phone yesterday, this e-mail is to inform you that on the above captioned well we will be changing the drilling fluid from the standard 8.9 ppg Flopro fluid to 8.5 ppg seawater. The reasons for this change is that a BHP measured inthis well on 2/28/99 showed a BHP of 1500 psi which is considerably less than the original presure of 3200 psi. This pressure yields a gradient of 3.3 ppg @ 8800' ss. Also in killing this well prior to running the whipstock assembly, the well would not hold a fluid column to the surface. We anticipate that we will drill the wel with fluid losses and therefore will continually pump down the CTx tubing annulus throughout the drilling and completion operation. If you have any questions, please call me at 265-1305 or e-mail me. > Thanks, Steve Ward 1 of 1 3/5/99 9:05 AM BP EXPLORATION To: AOGCC Date: Feburary 1, 1998 From' Bob Kaluza, ODE, SSD MB 8-1 Subject: Well Plan Revision 13-02A Well 13-02A was sidetrack drilled out of existing 7" casing into the Kingak Shale formation. A 6" hole was then directionally drilled with 10.5 ppg 6% KCL Gel Free Shale Inhibited Mud in the Kingak Shale to a depth of 9,965' at 90° horizontal where the pipe got stuck while making a connection. The pipe was jarred and worked up hole to a depth of 9,836' where the pipe packed off completely. An e-line string shot was RIH and the drill pipe was backed-off at 9,619' MD. The fish left in the hole consisted of one (1) it. of 3 1/2" DP, (1) PBL circulating sub, (1) drilling jar (up and down), (3) 4 3A" flex drill collars, Sperry Sun MWD, (1) short flex DC and float sub, 1.75° shod pack drilling motor and 6" bit. A screw-in fishing assembly was RIH and successfully engaged the fish. The fish could not be retrieved after eleven hours of jarring and working the fishing assembly. It was decided to set a cement plug on top of the fish and up to the milled window, then abandon this section of the hole. After the cement plug is set in place the well will be Shutdown of Well Operations leaving the original sidetracked wellbore cemented, a 4 1/2" hanger with 3000' of 4 W', L-80 tubing hung in the existing wellbore and the rig will be released to move to the ARCO Alpine field. Doyon Rig 14 is expected to resume operations on the well as soon as February 16, 1998 but no later than May 15, 1998. Objective: Unscrew out of the fish at 9,619' and POOH with the fishing assembly. RIH with a cement stinger on 3 1/2" DP, tag the top of the fish and pick-up 2-3'. Pump a one stage drill-off cement plug from + 9,619 to 9,200' MD (25' below the casing window). Reverse circulate excess cement, POOH laying down DP. Prepare well for shutdown of operations and release rig to ARCO. Revision 1. Back out the fishing assembly from the fish at 9,619'. Circulate and condition the hole. POOH, lay down the fishing assy. 2. RIH w/cementing stinger on 3 1/2" DP, tag the top of the fish, PU 2-3'. Rig up to pump cement. Test lines. 3. Pump 10 bbl water ahead, 175 sx (100 % excess), 17 ppg, Class 'G', .997 ft3/sx, .17% FL-52, .8% CD-32, .05% A-2, 1 ghs FP-6L, Batch mix. POOH to + 9,200' and reverse circulate out the excess cement and condition the mud. 4. POOH laying down DP. 5. MU 3,000' of 4 1/2" tubing below the tbg. hanger. Freeze protect the permafrost zone (+ 2,500'). Land hanger in tubing head. Test hanger. 7. Set BPV. Nipple up a dry hole cap with valve. Test same to 5000 psi. Release rig to ARCO. STATE OF ALASKA ALASKA U.= AND GAS CONSERVATION corv~m~SSlON APPLICATION FOR SUNDRY APPROVAL Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well []Stimulate .~. Name of Operator ARCO Alaska Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2171' NSL, 31' WEL, SEC. 14, T10N, R14E, UM At top of productive interval N/A At effective depth 4208' NSL, 1473' EWL, SEC. 13, T10N, R14E, UM At total depth 4545' NSL, 2063' EWL, SEC. 13, T10N, R14E, UM Type of well: [~ Development [] Exploratory i--I Stratigraphic I~ Service , Datum Elevation (DF or KB) Plan KBE = 74.30' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 13-02B 9. Permit Number 97-253 10. APl Number 50-029-20324-02 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 9965 feet true vertical 8680 feet Effective depth: measured 9200 feet true vertical 8433 feet Casing Length Size Plugs (measured) Junk (measured) Cemented Structural Conductor 20" 167 sx Class 'G' Surface 13-3/8" 7600 sx Class 'G' Intermediate 9-5/8" 1000 sx Class 'G' Production Liner 7" 652 sx Class 'G' ORIGINAL MD TVD 127' 2741' 8500' 3460'-9163' 127' 2741' 7894' 3460'-8406' Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) 4-1/2", L-80 to 3000' (planned) Packers and SSSV (type and measured depth) None RECEIVFD t,~.s Cons, Commission Alaska 0ii & Anchorage 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation February 2, 1998 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Bob Kaluza, 564-5344 Date approved I15. Status of well classifications as: [] Oil [--1 Gas F-~ Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certj,fy that the foregoi.rLg is true and correct to the best of my knowledge Signed(~' ~,~...~.¢,L.¢~.., ~~ Jam ith ,,¢ Title Engineering Supervisor Commission Use Only Conditions of Approval: Notify Commission so representative may witness Date E:~/~ ~ I Approval No..~,?,~'.- ~ Plug integrity __ BOP Test __ Location clearance __ pproved Copy Mechanical Integrity Test __ Subsequent form required 10- - [..rmrc .... z ~,~u of the Commission OH~Jii¢.l ~l,l~v _ , Commissioner Date Form 10-403 Rev. 06/15/88 ~v~u vv. Cu~,l~LU~i Submit In Tr~licate TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 December 31, 1997 Dan Stoltz Senior Drilling Engineer ARCO Alaska Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoc Bav Unit 13-02B ARCO Alaska Inc. Permit No: 97-253 Sur. Loc.' 2171'NSL, 31'WEL. Sec. 14, T10N, R14E. UM Btmholc Loc: 4570'NSL, 3869'WEL. Sec. 13, T10N. R14E. UM Dear Mr. Stoltz: Encloscd is the approved application for permtt to rcdrill thc above referenced well. The permit to redrill does not exempt you from obtaining additional permits required bv law from other governmental agencies, and docs not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance wifl~ 20 AAC 25 035. Sufficient notice (approximately 24 hours) must bc given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given bv contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Robert N. Christenson Commissioner BY ORDER OF THE COMMISSION dlf/Enclosurcs cc2 Department of Fish & Game, Habitat Section xv/o cncl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS-, .... -, OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oili [] Re-Entry [] DeepenI []Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 110. Field and Pool ARCO Alaska Inc. Plan KBE = 74.30' Prudhoe Bay Field / Prudhoe 3. Address 16. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028315 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2171' NSL, 31' WEL, SEC. 14, T10N, R14E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number U-630610 4906' NSL, 2771' WEL, SEC. 13, T10N R14E, UM 13-02B At total depth :9. Approximate spud date Amount $200,000.00 4570' NSL, 3869' WEL, SEC. 13, T10N, R14E, UM 01/06/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028311,530'I 12-19,364' at 13949' 2560 14570' MD / 8706' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 9200' MD Maximum Hole Angle 90.7° Maximum surface 2319 psig, At total depth (TVD) 8740' / 3200 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 BTC-Mod 1350' 9045' 8280' 10400' 8709' 177 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen OperationS.Present well condition summary Total depth: measured 10258 feet Plugs (measured) true vertical 9218 feet Effective depth: measured 10001 feet Junk(measured) true vertical 9026 feet GaSO0ft$' Casing Length Size Cej~~l & TVD St ruct u ral ~,flC~t0 f ag~ M D Conductor 20" 167 sx Class 'G' 127' 127' Surface 13-3/8" 7600 sx Class 'G' 2741' 2741' Intermediate 9-5/8" 1000 sx Class 'G' 8500' 7894' Production Liner 7" 652 sx Class 'G' 3460' - 10298' 3460' - 9250' Perforation depth: measured None (Squeezed Off)ORiGiNAL true vertical None (Squeezed Off) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Bo.~'Ka-lNza, 564-5344 Prepared By Name/Number: Terrie Hubble, 564-4628 ¢or¢o 21. I hereby certify that th/e/f lng correct to the best of my knowledge Signed . t, DanStotz ./~..¢:/'¢/¢'t ,./~( ¢-¢"~ Title Senior Drilling Engineer Date /7 - 2: ,,- ¢;2 Commission Use Only Permit Number I APl Number Approval Date _ See cover letter ?,/~-,~---,~, ~I 50-029-20324-02 / ~,-.3../.~ ~'~ for other requirements Conditions of Approval: Samples Required []Yes I~ No Mud Log Required []Yes J~No Hydrogen Sulfide Measures ~]Yes [] No Directional Survey Required J~Yes [] No Required Working Pressure for BOPE 1--12M; '~3M; []5M; I-il0M; [--115M Other: by order of /c2~"~' ""'~ Approved By .,.~IIN~L ~51GNED BY Commissioner the commission Date *,1_ L · ~ · ~' ~ ~.- .... Rober~ N. Oiu i~i.~dsor~ -- Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: 113-02B I I Type of Well (producer or injector): Well Plan Summary IProducer I Surface Location: 2171'FSL, 31'FEL, Sec. 14, T10N, R14E X = 687,178.80 Y = 5,932,237.63 Target Start: 4906' FSL, 2771' FEL, Sec. 13, T10N, R14E × = 689,648.00 Y = 5,935,036.00 Z = 8,632' TVDss Turn Point 5039' FSL, 1515' VEL, Sec. 13, T10N, R14E X = 690,900.00 Y = 5,935,200.00 Z = 8,627' TVDss Target End: 4570' FSL, 3869' VEL, Sec. 13, T10N, R14E X = 693,620.00 Y = 5,934,800.00 Z = 8,640 TVDss I AVE Number: 4J0372 Estimated Start Date: 11/06/98 I [Rig: I Doyon #141 ] Operating days to complete: I MD 114,57o I [TVD: 18,706' I Well Design (conventional, slim hole, etc.): 124 [KBE: ]74.30' Isidetrack micro-bore (3 ~A" hole) Objective: Sidetrack out of existing Sadlerochit well thru 7" csg., drill across an E-V~ 30-50' throw fault, set4 ½" liner in the Sag River, air. drill E C E IV E D + 4,000 horizontal ft. and complete w/2 7/8" in the Sag River. ~ ~C 2 S 199~ Alaska 0il & Gas Cons. Commission Formation Markers Anchorage Formation Tops MD TVD(RKB) Begin sidetrack 9,200' 8,434 Sidetrack from Whipstock window out of 7"scab liner into Kingak Shale. West Sak N/A N/A N/A N/A Top Seabee N/A N/A Top CM 1 N/A N/A Top HRZ N/A N/A Kingak 8389 8344 Sag River 10262 8704 Set MLAS joint in 4 ½" liner at TSAG Shublik N/A 8729 Z4B Casing/Tubing Program: Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD existing 13-3/8" 72# L-80 BTC 2741' 30'/30' 2771'/2771' existing 9-5/8" 47# L-80 BTC 8,500' 30'/30' 8530'/6339' plugged 7" 29# L-80 8RD 1349' 3460/3450' 10298'/9268' 6" 4 ½" 12.6# L-80 Mod 1350' 9045'/8280' 10400'/8709' Liner BTC 3 3A" 2 7/8" 6.16# L-80 STL 4275' 10250'/8700' 14570'/8690' slotted Logging Program: I Open Hole Logs: Drilling section: MWD/GR from KOP (9200') to Sag River. Sample catchers and rig site geologist before the top of the Sag River to TD. MWD/GR in the entire 3 ~A" Sag River horizontal section (10,395' - 14,570'). Mud Program: Special design considerations The final mud used on well 13-06A will be stored and re- conditioned to be used to drill the short 6" Kingak interval on this 13-02B well. Calcium carbonate bridging material will be removed and re-weighted with barite. Some additional Barotrol and Baranex will need to be added but the salvaged mud does contain shale inhibition products. Initial Kickoff Mud Properties: 7" Kickoff in Kingak Shale Density 10 sec gel Yield Chlorides Filtrate ph (PPG) Point HTHP 10.5 8-20 25-35 30,000 10.0 API 9.0 Mud Properties after kickoff: [ Drilling of Kingak interval Density 10 sec gel Yield Chlorides Filtrate ph (PPG) Point HTHP 10.5 6-15 10-20 30,000 10.0 8.5 - 9.0 Horizontal Drilling Mud Properties: Displaced at Top Sag River Density LSYP LSRV Filtrate ph (PPG) HTHP 8.7 - 8.8 12 - 20 35 - 55,000 <7.5 @200° 8.5 - 9.0 Directional: KOP: 1) 9,200' MD, drill out of a whipstock window in 7" csg at 56° azimuth, 42° inclination, build angle to 90° at 9°/100, rate, drill ahead at 56° azimuth thru target #1, turn right to 90° azimuth into interim target at 12°/100', turn right at 10°/100' to 100° azimuth, sail (2,620') to TD. Maximum Hole Angle: Close Approach Well: Point to point separation 90.7° in the Sag River horizontal section 13-20 552' at 10,617',13-03 768' at 12,127' MD & 12-19 364' at 13,949' MD Cement Data: Casing/Liner Lead: Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments P&A of original well 119/15.8/1.15 "G" at 15.8 ppg 4 ½" liner from 9,045' 177/15.7/1.19 Class "G", 50% excess to 10,400'MD OH + 200' 7" x 3 ½" DP + shoe Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. NO ANNULAR INJECTION IN THIS WELL. Bottom hole pressure is 3,200 psi at 8,740' TVDss (estimated) Maximum shut-in casing pressure is 2,319 psi (assumes 0.1 psi/ft gas gradient to surface). 13-02A CI II drilling wastes areTo be disposed at CC-2A grind and inject facility. If Cl I wastes are generated, they will be taken to the Pad 3 disposal site. Drilling Discussion Well Objective 13-02B is a horizontal sidetrack targeting the Sag River Sandstone. This well is in the gravity drainage area in northern DS 13 near the Sag gas cap. Favorable results from 12-13B Sag pilot well and the large undeveloped area of the Sag reservoir north of 13-02A promote dedicated Sag offtake in this region. This well is part of the "opportunity exploitation" of the Sag reserves near the gas cap which utilizes existing assets with marginal Sadlerochit targets. An estimated 10 mmstbo of EOA Sag recovery is at risk in this "gas cap drive" area if it remains undeveloped. This well drains an area of 160 acres below the gas cap with expected 6 month average production rate of 1,300 bopd. Because of the low permeability of the Sag River this well is expected to produce at 1,000 bopd for years. Drilling Objective The objective is to cut and pull the existing 5 ½" x 4 ½" x 3 ½" completion tubing above the 7 x 3 ½" production pkr @ 9,490' MD, mill a window by whipstock in the 7" scab liner @ 9,200' MD, directionally drill 6" hole _+ 250' into the Sag River formation @ 10,273' MD. Run, cement and test a _+ 1,350', 4 ½" liner. Drill out the shoe with a 3 ~" PDC bit and directionally drill Sag River horizontal to TD at +_ 14,570'. The well will be completed as a Sag River producer with a 2 7/8" slotted liner set in the Sag horizontal section and hung in the 4 ½" liner. The 4 1/2" liner will have a MLAS joint in the string at the Sag River formation top (for a future CT Sag River well to the east). A 4 ½" tbg. completion crossed-over to 5 ½" (to fit the hanger) with (3) GLM's will be run. The 7" x 4 ½" production pkr. will be set at _+ 8,988'. The well will be directionally drilled out of the 7" window to TD where none of the build or turn angles will exceed 12°/100'. The soft dog legs will minimize drag in the extended wellbore. DRILLING HAZARDS AND CONTINGENCIES Always have two levels of tested isolation before NU/ND. SURFACE CLOSE APPROACH WELL SHUT-INS There are no wells which need to be shut in during the rig move. Surface well spacing of the adjacent wells is 120'. Careful coordination with any ongoing pad or facility operations or activities will be initiated prior to commencing the rig move. DRII,LING CLOSE APPROA~4 WELL SHUT-INS No shut-ins identified on Sperry Sun directional well plans. Wells 13-03, 13-20, and 12-19 failed the PBU anticollision guidelines and will require exemption from 9,200' to 11,930' MD. The closest actual point to point separation falls within the area where proximity is still 'passing', but the proposal fails proximity from 9,300' to 11,930' MD. Presently, Well 13-03 is shut-in at surface, Wells 13-20 and 12-19 are water injectors. ~ DS 13 has had H_2S reported: The highest levels of H2S from currently producing wells is 122 ppm from 13-05 measured on 10-17-95. Four other wells on DS 13 have reported H2S of _< 36 ppm. H2S precautions will be in effect at all times. These include (but are not limited to): · Regular H2S drills (minimum of two per week) · Proper training of all permanent onsite personnel, unescorted visitors and temporary onsite personnel · H~S monitors with both audible and visual alarms · Access to 5-minute emergency escape air packs · Personal H2S monitors · Functional wind indicator · Posted evacuation routes (minimum of two) · Muster points in designated safe areas; H__~_S · Functional communications between rig camp and rig floor. Surface Casing Shoe Kick Tolerance The smallest kick tolerance for the kick off window is calculated as infinite of influx assuming a swabbed gas influx at the top of the Sag River along the planned directional path. Based on 8.7 ppg MW (Sag at 10,682' MD & 8,841' TVD 7.0 ppg reservoir pore pressure), and frac at the window 12.0 ppg. Pre-Rig Work 1. RU slickline and drift 3 V2" tbg. If cannot get to production packer, notify Operations Drilling Engineer (ODE). 2. Perform CMIT on tbg. IA/OA. The 9 5/8" packoff is known to leak. Report these results to the ODE. 3. P & A open perforations. Open perforations at 9,659 - 9,679', 9,840 - 9,860' and 9,870 - 9,900' MD. Perform P & A to 100' below bottom perforation interval, bullhead 19.5 bbl (126 sx) 15.8 ppg, 1.15 ft3/sx, Class 'G' cement displaced to the perforation intervals by 107 bbl seawater. Cement top MUST NOT be above 9,490' MD (minimum per AOGCC + 9,559' or 100' above uppermost open perforations). Tag and test cement plugback. 4. RU electric line and make a chemical tubing cut in the first full joint above production packer (cut at + 9,460' MD). Circulate well to seawater through the cut. Freeze protect to _+ 2,200' MD. Note: If the tubing is plastic coated, run a double anchor-double acid cylinder cutter. 5. Do not need to test the 9 5/8" packoff (packoff is known to leak) but carefully cycle the LDS. Rig Sidetrack Procedure 1. MIRU. ND tree, NU and test B OPE. Circulate well clean. 2. Pull the 3 V2" tubing completion. 3. Set 9 5/8" storm packer. Change the upper and lower 9 5/8" packoffs. 4. Set EZSV Bridgeplug on electric line at @ 9,200' MD. 5. Pressure test Casing/Bridgeplug to 3,500 psi. For 30 minutes. 6. Mill a window by Whipstock in 7" casing at + 9,185 - 9,200' MD. 7. Kick-off and directionally drill 6" hole to + 10,400' MD (+ 250' horizontal into the Sag River). 8. Run, cement and test 4 V2" production liner. Note: A MLAS joint will be placed in the 4 V2" liner at the TSAG 9. Directionally drill 3 3fi" horizontal hole in the Sag River to _+ 14,563' MD, 8,708' TVD. 10. Run 2 7/8" slotted liner. 11. Complete well with 4 V2", L-80 tubing and (3) 1" GLM' s. 12. ND BOPE, NU and test tree, freeze protect. 13. Release rig. Well' 13-02A Spud Date: 2/4/83 Original RKBE: 86' Top of Formation: 9782' ARCO Alaska, Inc. - Prudhoe API #: 50-029-20324-01 / Completion: 6/24/91 Hanger Type :. FMC Gen I Max Hole Angle: 44° @ MD: 9~00' Annular Fluid:Diesel/8.3 NaC1 Reference Log: BHCS Date:2/18/83 Tie In: Type: PRODUCER Status: Sidetrack Hanger: 3 6 ' Angle @ TS:42° Angle @ TD:41° Date: 00/00/00 ALL DEPTHS A/{E RKB DRILLING MD TO TOP OF EQUIPMENT EXCEPT WHERE NOTED. Jewelry (J) J-1 Depth Description 1 39' Crossover 5-1/2" x'4-1/2" 2 2231' 4-f/2" AVA TRSV SSSV Nipple ID=3.812" 3 3366' Crossover 4-1/2" x 3-1/2" ~O~2341' 4 9490' 7" x 3-1/2"Otis BWDPemanent Packer ~0@247T 5 9608i 3-1/2"OtisXNNipple ID=2.75" w/PXN?lug ID=0.001" · (Set 10/14/94) 6 9619' 3-1/2" Tubing Tail 9604' EkMTubing Tail (Logged07/15/91) J~ 8 9890' Sand C~3 Min ID: 3-1/2" Otis XN Nipple ID-2.75" w/PXN Plug ID~0.001" G2 J-5 J.~ Casing and Tubing (C) Size Weight Grade 1 13-3/8" 72~ L-80 2 9-5/8" 47~ 5-80 3 7" 29~ L-80 4 7" 29~ 5-80 5-1/2" 17% 13CR-80 4-1/2" 12.6~ 13CR-80 .3-1/2" 9.3~ 13CR-80 o. Gas Lift Information (G) MD TVD Stn Mandrel 3001' (3001') 1 TE-TGPDX MC 3635' (3635') 2 TE-TGPDX MC 4519' (4516') 3 TE-TGPDX TE 5400' (5323') 4 TE-TGPDX MC 6412' (6180') 5 TE-TGPDX TE 7294' (6910') 6 TE-TGPDX TE 7920' (7429.') 7 TE-TGPDX TE 8634' (8002') 8 TE-TGPDX TE 9301' (8512') 9 TE-TGPDX · Top Bottom Description' 0' 2741' Casing 0' 8500-'.. Casing 3460' 8138' 'Liner-Tieback 8138' 10298' Liner 0' 37' FOX CR Tubing 37' 3366' FOX CR Tubing 3366' - 9619' FOX CR Tubing ,, Valve Type VR-D TG VR-STD TG D-14R TG VRSO TG D-14R TG D-14R TG D-14R TG D-14R TG Latch Port TRO Date 1/4"% 1744 7/16" ORIF TE ED-15R TG Perforation Data (ELM DEPTHS) (P) Interval Zone FT SPF 1 9659- 9679 SAG 20 1/4 9786- 9824 4 38 0 9840- 9860 4 20 4 9870- 9900 4 30 4 9900- 9916 4 16 0 9926- 9960 4 34 0 Date Comments 07/15/91 APERE 06/24/91 SQZ 07/15/91 RPERF 07/15/91 RPERF 06/24/91 SQZ 06/24/91 SQZ FRAC ZN4 08/19/91 Datum 8700' SS= 9661' MD 8800' SS= 9797' MD PBTD=10258' TD=10300' Revision Date: 10/27/94 by ENH Reason' Reset TTP Previous Reason: 10/13/94 Well 13-02A 13.02B Sag Riv,'' Producer Odginal KB. ELEV: 72.80' BF. ELEV: 44.9" Hanger Type: FMC Gen I 13-3/8, 72# L-80 BTRS I2'741' MD I SSSV @2,231'MD 9 5/8". L-80, 47#, BTC Set @ 8,500' liner set @ 3,460'MD 4-1/2", 12.6~, L-80 Tubing ,~, nipple 7" Baker Prod. Pkr. set at @ 8,978' MD 7" x 9 518" Hngr/Pkr set at @ 9,050' MD Section @ 9,186' MD EZSV Bridgeplug @ 7,000' MD ::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::: :.:.:.:.:.:.:.:.:.:.:.:.:.:.:,:,:.:.:.:.:-:.:.:.:.:. ::::::::::::::::::::::::::::::::::::::::::::::::::::: :.:.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:.:*: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::: 3 1/2" tbg. cut at @ 9,460' MD Perfs P & A 7" 29# L-80 BTC-Mod [10,298' MD I TSAG 2 7/8" SIo~4,570' MD DATE 12/15/97 REV BY B. Kaluza COMMENTS Sidetrack to Sag River Horz. Prod. BP PRUDHOE BAY UNIT WELL: 13-02B APl NO: 50-029-20324-01 SEC 13, T. 10N., R.14 E. ,Exploration (Alaska) Shared Services Drilling SURFACE LOCATION REFERENCE PLOT DATE: 11 - Dec - 1997 Horizontal Coordinates: RKB Elevation: 5932237.63 N, 687178.80 E 29.50 tt Rig (EST) 46.00 It Well (CBE) 75.50 it RKB - AMSL NAD27 Alaska State Planes, Zone 4, US Foot Created By: ...... f Checked By: .J~/~ PropOsal Target Summary Coordinate System: Target Name: TVDss: TVDrkb: Wellhead Offsets: 2736.27 N, 2537.84 E 2869.17 N, 3793.52 E 2401.84 N, 6502.77 E Global Coordinates: 5935036.00 N, 689648.00 E 5935200;00N, 690900.00 E 5934800.00N, 693620.00 E -I DrillQUest"l Proposal Data for 13-02BWp6 Vertical Origin: Structure Reference Hodzontal Origin: Well Measurement Units: It Noclh Reference: Tree North Vertical ,~on Azimuth: Vedlcal Section DescdptionKOP Vedical Section Origin: 2037.41 N,1500.97 E Measured Incl. Azlm. Vertical Northings East~ Vectlcal Depth Depth Section F~te- 13-02B Target 1 8640.00 8715.50TVD 13-02B Target 2 8627.00 8702.50 TVD 13-02B Target 3 8632.00 8707.50 TVD 9200.O0 41.848 56.427 8434.22 2037.41 N 1500.97 E 2511.25 9230.00 41.904 52.832 8456.56 2049.00 N 1517.29 E 2530.89 8.000 9726.31 86.456 56.582 8667.38 2298.30 N 1874,37 E 2957.48 9.000 10486.93 86,456 56.582 8714.39 2716.40 N 2508.03 E 3696.85 0.000 10522.78 90.000 56.O42 8715.$0 2736.27 N 2537.84 E 3731.78 I0.000 10622.78 90,000 56.O42 8715.50 2792.13 N 2620.78 E 3829.38 0.000 10908.93 90.711 90.373 8713.67 2873.$7 N 2890,64 E 4074.13 12.000 11770.60 90.711 90.373 8702.98 2867.95 N 3752.23 E 4662.80 0.000 11811.92 90.634 86.241 8702,50 2869.17 N 3793.52 E 4692.10 10.000 11951,08 89.877 100.137 8701.88 2861.45 N 3932.12 E 4781.84 10.000 14562.49 89.877 100.137 8707.50 2401.84 N 6502.77 E 6216.80 0.000 820( 860~ 9000 ~ .... 13~2BWp6- - ''~ .... I I I I I I I I I 2600 3000 ~00 3800 4~ 4600 ~00 ~00 ~ 6200 S~le: lin~ = 400ff Ve~l Sec~oR ' . ~on ~m~: 43.469" ~me No~) Shared Services Drilling ,[ DrillQuest' SURFACE LOCATION REFERENCE PLOT DATE: 11 -Dec - 1997 Horizontal Coordinates: RKB Elevation: Coordinate System: 5932237.63 N, 687178.80 E 29.50 ft Rig (EST) 46.00 ft Well (CBE) 75.50 ft RKB - AMSL NAD27 Alaska State Planes, Zone 4, US Foot Created By: Checked By: ~-~--~'~.-"~ Proposal Target Summary Target Name · TVDss: TVDrkb: Wellhead Offsets · 13-02B Target I 8640.00 8715.50 TVD 13-02B Target 2 8627.00 8702.50TVD 113-02B Target 3 8632.00 8707.50 TVD / 2736.27 N, 2537.84 E 2869.17 N, 3793.52 E 2401.84 N, 6502.77 E Global Coordinates: 5935036.00N, 689648.00 E 5935200.00N, 690900.00 E 5934800.0qN, 693620.00 E Proposal Data for 13-02B Wp6 Vedical Origin: S~ructum Reference Horizontal Origin: Well MeasuremenlUnlts: ft No~th Reference: Tree North VDogleg Sevedty: Degrees pe~ 100fl ertlcal Section Aztmulh: 43.469' Valical Seclioa CMgln: 2037.41N,1500.97 E Measured Incl. Azlm. Vertical No~thlags Eastings Vertical Dogleg Depth Depth ~;~tcl~o~ Rate 9200.00 41.848 56.427 8434,22 2037.41 N 1500.97 E 2511.25 9230.00 41.904 52.832 8456.56 2049.00 N . 1517.29 E 2530.89 8.000 9726,31 86.456 56.582 8667,38 2298.30 N 1874.37 E 2957.48 9.000 10486.93 86.456 56.582 8714.39 2716.40 N 2508.0.3 E 3696.85 0.000 10522,78 90.000 56,042 8715.50 2736.27 N 25.37.84 E 3731.78 10.000 10622,78 90.000 56,042 8715.50 2792.!3 N 2620.78 E 3829.38 0.000 10908.93 90.711 90.373 8713.67 2873.57 N 2890.64 E 4074.13 12.000 11770.60 90.711 90,373 8702.98 2867.95 N 3752.23 E 4662.80 0.000 11811.92 90.634 86.241 8702.50 2869.17 N 3793.52 E 4692.10 I 0.000 11951.08 89.877 100.137 8701.88 2~61.45 N 3932.12 E 4781.84 10.000 14562.49 89.877 100.137 8707.50 2401.84 N 6502.77 E 6216.80 0.000 2700 - .__q o 2100 - 8(X)( Scale: linch = 600ft Eastings 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 I I I I I I I I I I, I 1500 - I I I I I I I I I 1' 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 , Scale:linch = 600R , Easfings - Reference is Tme North - 2700 2100 S , _ . rry- S u n D rillin g e rvi c e s Proposal Report for 13-02B - 13-02B Wp6 Shared Services Drilling Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOADS13 Measured Vertical Depth Incl, Azim, Depth Northings Eastings (ft) (ft) (ft) (ft) Vertical Dogleg Section Rate (ft) (o/looft) 9200.00 41.848 56.427 8434.22 2037.41 N 1500.97 E 9230.00 41.904 52.832 8456.56 2049.00 N 1517.29 E 9726.31 86.456 56.582 8667.38 2298.30 N 1874.37 E 10486.93 86.456 56.582 8714.39 2716.40 N 2508.03 E 10522.78 90.000 56.042 8715.50 2736.27 N 2537.84 E 10622.78 90.000 56.042 8715.50 2792.13 N 2620.78 E 10908.93 90.711 90.373 8713.67 2873.57 N 2890.64 E 11770.60 90.711 90.373 8702.98 2867.95 N 3752.23 E _11811.92 90.634 86,241 8702.50 2869.17 N 3793.52 E 11951.08 89.877 100.137 8701.88 2861.45 N 3932.12 E 14562.49 89.877 100.137 8707.50 2401.84 N 6502.77 E 2511.26 2530.90 8.000 2957.48 9.000 3696.85 0.000 3731.78 10.000 3829.38 0.000 4074.13 12.000 4662.80 0.000 4692.09 10.000 4781.64 10.000 6216.78 0.000 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Structure Reference. North.ings and Eastings are relative to Well. , The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 43.469° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14562.49ft., The Bottom Hole Displacement is 6932.16ft., in the Direction of 69.728° (True). Formation Tops Measured Depth (ft) Vertical Sub.Sea Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 10181.31 8695.50 8620.00 2548.40 N 2253.42 E 10262.20 8700.50 8625.00 2592.87 N 2320.81E 10343.08 8705,50 8630,00 2637,33 N 2388,20 E Formation Name TSAG - High TSAG - Predicted TSAG - Low Casin~ ~details From Measured Vertical' Depth Depth (ft) (ft) 9200,00 8434,22 92O0.OO 5434,22 To Measured Vertical Depth Depth Casing Detail (ft) (ft) 10400.00 8709.02 4 1/2" Liner 14562,49 --.- 8707.50 2 7/8" Liner Targets associated with this wellpath Target Name 13-02B Polygon 13-02B Target 1 13-02B Target 2 13-02B Target 3 Target Entry Coordinates 'i'VD Northlngs Eastlngs Target Target (fl) (ft) (fi) Shape Type 75,50 3066.17 N 1900.93 E Polygon Geological 8715,50 2736.27 N 2537.84 E Point Geological 8702,50 2869,17 N 3793,52 E Point Geological 8707.50 2401.84 N 6502.77 E Point Geological Shared Services Drilling Prudhoe Bay Unit Measured Depth (ft) Incl. Azim. Sperry. Sun Drilling Services Proposal Report for 13-02B. 13-02B Wp6 Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 9200.00 41.848 56,427 8358.72 8434.22 9230.00 41.904 52.832 8381.06 8456.56 9300.00 48.180 53.616 8430.49 8505.99 '~ 9400.00 57~153 54.504 8491.08 8566.58 / 9500.00 66.130 55.227 8538.53 8614.03 9600.00 75.111 55.856 8571.68 8647.18 9700.00 84.093 56.434 8589.71 8665.21 9726.31 86.456 56.582 8591.88 8667.38 9800.00 86.456 56.582 8596.43 8671.93 9900.00 86.456 56.582 8602.61 8678.11 10000.00 86.456 56.582 8608.79 8684.29 10100.00 86.456 56.582 8614.97 8690.47 10181.31 86.456 56.582 8620.00 8695.50 10200.00 86.456 56.582 8621.16 8696.66 10262.20 86.456 56.582 8625.00 8700.50 10300.00 86.456 56,582 8627,34 8702.84 10343.08 86.456 56.582 8630.00 8705.50 10400.00 86.456 56.582 8633.52 8709.02 10486.93 86.456 56.582 8638.89 8714.39 10500.00 87.748 56.385 8639.55 8715.05 !522.78 90.000 56.042 8540.00 8715.50 ~ 0600.00 90.000 56.042 8640.00 8715.50 10622.78 90.000 56.042 8640.00 8715.50 10700.00 90.203 65.307 8639.86 8715.36 10800.00 90.457 77.304 8639.29 8714.79 2037.41 N 1500.97 E 2049.00 N 1517.29 E 2078.63 N 1556.96 E 2125.22 N 1621:29 E 2175.79 N 1693.20 E 2229.10 N 1770.91 E 2283.83 N 1852.51 E 2298.30 N 1874.37 E 2338.80 N 1935.76 E 2393.77 N 2019.07 E 2448.74 N 2102.38 E 2503.71 N 2185.69 E 2548.40 N 2253.42 E 2558.68 N 2268.99 E 2592.87 N 2320.81 E 2613,65 N 2352.30 E 2637.33 N 2388.20 E 2668.62 N 2435,61 E 2716.40 N 2508,03 E 2723,61 N 2518,91 E 2736.27 N 2537.84 E 2779.41 N 2601.89 E 2792.13 N 2620,78 E 2829.91 N 2688.04 E 2861.90 N 2782,59 E Global Coordinates · Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 5934311.64 N 688628.78 E 5934323.63 N 688644.81 E 8.000 5934354.23 N 688683.73 E 9.000 5934402.40 N 688746.89 E 9.000 5934454.74 N 688817.51 E 9.000 5934509.96 N 688893.88 E 9.000 5934566.70 N 688974.10 E 9.000 5934561.71 N 688995.60 E 9.000 5934623.72 N 689055.96 E 0.000 5934680.74 N 689137.88 E 0.000 5934737.76 N 689219.80 E 0.000 5934794.77 N 689301.72 E 0.000 5934841.14 N 689368.33 E 0.000 5934851.79 N 689383.64 E 0.000 5934887.26 N 689434.59 E 0.000 5934908.81 N 689465.56 E 0.000 5934933.38 N 689500.85 E 0.000 5934965.63 N 689547.48 E 0.000 5935015.40 N 689618.69 E 0.000 5935022.87 N 689629.39 E 10.000 5935036.00 N 689648.00 E 10.000 5935080.71 N 689710.96 E 0.000 5935093.90 N 689729.53 E 0.000 5935133.33 N 689795.83 E 12.000 5935167.66 N 689889.55 E 12.000 Vertical Section (ft) Comment 2511.26 2530.90 2579.69 2657.76 2743.93 2636.08 2931.94 2957.48 3029.11 3126.32 3223.52 3320.73 3399.77 TSAG - High 3417.93 3478.39 TSAG - Predicted 3515.14j 3557.02' TSAG - Low 3612.35 4 1/2' Uner 3696.85 3709.57 3731.78 Target: 13-02B Target 1, Geological 3807.15 3829.38 3903.06 3991.33 Ala '1 December, 1997.8:41 -l- Sperry-Sun Drilling Services Proposal Report for 13-02B - 13-02B Wp6 Shared Services Drilling Prudhoe Bay Unit Measured Depth Incl. Azim. Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 10900.00 90,691 89.302 8638.28 8713.78 10908.93 90.711 90,373 8638.17 8713.67 11000.00 90.711 90,373 8637,04 8712,54 11100.00 90.711 90.373 8635.80 8711,30 11200.00 90.711 90.373 8634.56 8710.06 11300.00 90.711 90,373 8633.32 8708.82 11400.00 90.711 90.373 8632.08 8707,58 11500.00 90.711 90.373 8630,84 8706.34 11600.00 90.711 90.373 8629.60 8705,10 11700.00 90.711 90.373 8628.36 8703.86 11770,60 90.711 90,373 8627,48 8702.98 11800,00 90,656 87,433 8627.13 8702.63 11811.92 90.634 86,241 8627,00 8702.50 11900,00 90.156 95,037 8626.39 8701,89 11951,08 89.877 100.137 8626.38 8701.88 12000.00 89.877 100.137 8626.48 8701,98 12100.00 89.877 100,137 8626.70 8702,20 12200.00 89.877 100.137 8626.91 8702.41 12300,00 89.877 100.137 8627.13 8702.63 12400,00 89.877 100.137 8627.34 8702.84 12500.00 89.877 100.137 8627.56 8703.06 12600,00 89.877 100.137 8627.77 8703.27 12700.00 89.877 100.137 8627.99 8703.49 12800.00 89.877 100.137 8628.21 8703.71 12900.00 89.877 100.137 8628.42 8703.92 2873.54N 2881.72 E 2873.57 N 2890.64E 2872,97 N ; 2981.71E 2872.32 N ' 3081,70 E 2871.67 N 3181.69 E 2871,02 N 3281.68 E 2870.37 N 3381.67 E 2869,71N 3481.66 E 2869.06 N 3581.65 E 2868.41N 3681,64E 2867.95 N 3752.23 E 2868.51N 3781,62 E 2869,17 N 3793.52 E 2868.19 N 3881.51E 2861,45 N 3932.12 E 2852.84N 3980.28 E 2835.24N 4078.72 E 2817.64N 4177.16 E 2800.04N 4275,60 E 2782.44N 4374,04E 2764,84N 447~47 E 2747.24N 4570.91E 2729.64N 4669,35 E 2712.04 N 4767.79 E 2694,44N 4866,23 E Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 5935181.76 N 689988.37 E 12.000 5935182.00 N 689997,29 E 12,000 5935183,67 N 690088.34E 0.000 5935185.50 N 690188.32 E 0.000 5935187.32 N 690288.29 E 0.000 5935189.15 N 690388.27 E 0.000 5935190.98 N 690488,24 E 0.000 5935192.81N 690588.22E 0.000 5935194.64N 690688,19 E 0.000 5935196.47 N 690788.17 E 0.000 5935197.76 N 690858,75 E 0.000 5935199.05 N 690888,12 E 10.000 5935200,00 N 690900,00 E 10.000 5935201.20 N 690987.98 E 10.000 5935195.72 N 691038.75 E 10.000 5935188.30 N 691087.10 E 0.000 5935173.15 N 691185.95 E 0.000 5935158.00 N 691284.79 E 0.000 '5935142.84N 691383.64E 0.000 5935127.69 N 691482.48 E 0.000 5935112.54N 691581.33 E 0.000 5935097.38 N 691680.17 E 0.000 5935082.23 N 691779.02 E 0.000 5935067.08 N 691877.86 E 0.000 5935051.92 N 691976.71E 0.000 Vertical Section (ft) 4067.98 4074.13 4136.35 4204.67 4272.99 4341.30 4409.62 4477.93 4546.25 4614.57 4662.80 4683.43 4692.09 4751.91 4781.84 4808.7~ 4863.67 4918.62 4973.57 5028.52 5083.46 5138.41 5193.36 5248.31 5303.26 Comment Target: 13-02B Target 2, Geological 11 December, 1997- 8:4'! -2- Sperry-Sun Drilling Services Proposal Report for 13-02B - ~13-02B Wp6 Shared Services Drilling Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (rt) (ft) (rt) Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (o/'looft) 13000.00 89.877 100.137 8628.64 8704.14 2676.64 N 4964.67 E 13100.00 89.877 100.137 8628.85 8704,35 2659,24 N 5063,11 E 13200.00 89.877 100,137 8629.07 8704,57 2641,64 N 5161.55 E 13300,00 89.877 100,137 8629.28 8704.78 2624,04 N .5259.98 E 13400,00 89.877 100.137 8629.50 8705.00 2606.44 N 5358,42 E 13500.00 89.877 100.137 8629.71 8705.21 2588.84 N 5456.86 E 13600.00 89.877 100.137 8629.93 8705.43 2571.24 N 5555.30 E 13700.00 89,877 100.137 8630.14 8705,64 2553,64 N 5653.74 E 13800.00 89,877 100.137 8630.36 ' 8705.86 2536.04 N 5752.18 E 13900,00 89.877 '100.137 8630.57 8706.07 2518,44 N 5850.62 E 14000,00 89.877 100.137 8630.79 8706.29 2500,84 N 5949.06 E 14100.00 89.877 100.137 8631,00 8706.50 2483.24 N 6047.49 E 14200.00 89.877 100.137 8631.22 8706.72 2465,64 N 6145.93 E 14300.00 89.877 100.137 8631.43 8706.93 2448.04 N 6244.37 E 14400.00 89.877 100.137 8631.65 8707.15 2430.44 N 6342.81 E 14500.00 89.877 100.137 8631.87 8707.37 2412.84 N 6441.25 E 14562.49 89.877 100.137 8632.00 8707.50 2401.84 N 6502.77 E 5935036.77 N 692075.55 E 0.000 5935021.62 N 692174.40 E 0,000 5935006.46 N 692273.24 E 0.000 5934991.31 N 692372.09 E 0.000 5934976.16 N' 692470.93 E 0.000 5934961.00 N 692569.78 E 0.000 5934945.85 N 692668.62 E 0.000 5934930.70 N 692767.47 E 0.000 5934915.54 N 692866.31 E 0.000 5934900.39 N 692965.16 E 0.000 5934885.24 N 693064.00 E 0.000 5934870.08 N 693162.85 E 0.000 5934854.93 N 693261.69 E 0.000 5934839.78 N 693360.54 E 0.000 5934824.62 N 693459.38 E 0.000 5934809.47 N 693558.23 E 0.000 5934800.00 N 693620.00 E 0.000 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. · {ertical depths are relative to Structure Reference. Northings and Eastings are relative to Well. / The Dogleg Severity is in Degrees per 100ff. Vertical Section is from Well and calculated along an Azimuth of 43.469° (True).. Based upon Minimum Curvature type calculations, at a Measured Depth of 14562.49ft., The Bottom Hole Displacement is 6932.16ft., in the Direction of 69.728° (True). Vertical Section (ft) Comment 5358.21 5413.16 5468.11 5523.06 5578.00 5632.95 5687.90 5742.85 5797.80 5852.75 5907.70 5962.65 6017.60 6072.55 6127.49 6182.44 6216.78 ~ 2 7~8" Uner Target: 13-02B Target 3, Geological -3- December, 1997 - 8:41 · VENDOR Ai .ASi, C. AST 14 O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 111897 CK 111897M 100. O0 100. O0 PYMT COMMENTS: accompang permit to drill app 1 ication HANDLING INST: s/h terrie hubbl~:, x4(~28 ·WELL PERMITCHECKLIST COMPANY/r-(__o WELL NAME ~._,,/CP~', //,5~-~._~ PROG, RAM:expDdev~redrl~serv[-lwellboreseg£'ann. disposalparareqEI FIELD & POOL ~ ¢-~d3,,~,_,¢',:::~ INIT CLASS ~/'"')~_,~_,/ ./-~-,)/.// GEOL AREA . ~¢'~?_,,,_~ UNIT# ./'//o~'.,~',~ ON/OFF SHORE ADMINISTRATION ENGINEERING 1. Permit fee attached ....................... / Y N 2. Lease number appropriate ................... I Y N 3. Unique well name and number .................. I Y N 4. Well located in a defined pool .................. I Y N 5. Well located proper distance from drilling unit boundary .... IY N 6. Well located proper distance from other wells .......... IY N 7. Sufficient acreage available in drilling unit ........... IY N 8. If deviated, is wellbore plat included ............ IY N 9. Operator only affected party .................. IY N 10. Operator has appropriate bond in force ............. IY N 11. Permit can be issued without conservation order ........ I Y N 12. Permit can be issued without administrative approval ...... /Y N 13. Can permit be approved before 15-day wait ........... ~N 14. Conductor string provided ................... Y N 15. Surface casing protects all known USDWs ........... Y N~/ (/' 16. CMT vol adequate to circulate on conductor & sud csg ..... Y 17. CMT vol adequate to tie-in long string to surf csg ........ ,.,Y.~ 18. CMT will cover all known productive horizons .......... ~ N 19. Casing designs adequate for C. T, B & permafrost ....... t~ N 20. Adequate tankage or reserve pit ................. (.Y,] N 21. If a re-drill, has a 10-403 for abandonment been approved... Y N 22. Adequate wellbore separation proposed ............. N 23. If diverter required, does it meet regulations .......... N 24. Drilling fluid program schematic & equip list adequate ..... N 25. BOPEs, do they meet regulation .... ~_',,~z"4--, ........ N 26. BOPE press rating appropriate; test to "'~"'""-" ....psig. N 27. Choke manifold complies w/APl RP-53 (May 84) ........ N 28. Work will occur without operation shutdown ........... N 29. Is presence of H~S gas probable ................. N GEOLOGY DATE, 30. Permit can be issued w/o hydrogen sulfide measures ..... Y~N 31. Data presented on potential overpressure zones ....... YY,/N'//~.,,.,,'3./~_ ~, 32. Seismic analysis of shallow gas zones ............. ,,)r" N ' 33. Seabed N condition survey (if off-shore) ............ ./ Y 34. Contact lexplora~ory only] N name/phone for we.eklyprogress reports ..... .~. Y REMARKS GEOLOGY: ENGINEERING' COMMISSION' BEW~,¢.~ ~'~/r'CE, DWJ ~,,,¢' JDH ~ ' RNC~ CO Comments/Instructions: I'lClW/llt - A \F(')RMF\,-'I~,,I-Iml ,,'v II,~{I Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Thu Oct 01 11:54:21 1998 Reel Header Service name ............. LISTPE Date ..................... 98/10/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Technical Services Tape Header Service name ............. LISTPE Date ............ · ......... 98/10/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Technical Services Library. Scientific Library. Scientific Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: MWD RUN 3 AK-MW-80166 T. MCGUIRE DENIS AKERMA MSL 0) 500292032471 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 01-0CT-98 . 14 10N ~ ~ OCT 07 195'0 3 z ~chorage 78.10 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 76.60 46.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.375 30.0 9.625 8530.0 7.000 9038.0 6.000 9362.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1 AND 2 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 3. MWD RUN 3 IS DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP) . 4. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN MARSHALL MUNYAK OF SPERRY-SUN DRILLING SERVICES AND BECKY WATSON OF ARCO ALASKA, INC. ON 29 SEPTEMBER, 1998. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 9362'MD, 8454'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAy. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR ROP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 8988.5 9309.5 9041.5 9362.0 BASELINE DEPTH MERGED DATA SOURCE EQUIVALENT UNSHIFTED DEPTH PBU TOOL CODE MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 3 9041 . 0 9362 . 0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 8988.5 9362 9175.25 748 8988.5 ROP 14.2865 185.829 46.2461 642 9041.5 GR 51.5687 222.608 111.572 643 8988.5 Last Reading 9362 9362 9309.5 First Reading For Entire File .......... 8988.5 Last Reading For Entire File ........... 9362 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8988.5 ROP 9041.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNMOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9309.5 9362.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NAT~ GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATI/RE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 24 -MAR- 98 5.07 3.00 / 7.20 MEMORY 9362.0 9041.0 9362.0 41.8 73.6 TOOL NUMBER PCG 47 6.000 6.0 MINER3~L OIL MUD 11.00 61.0 .0 0 2.0 .000 .000 .000 .000 65.6 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 8988.5 9362 9175.25 748 8988.5 GR 51.5687 222.608 111.572 643 8988.5 ROP 14.2865 185.829 46.2461 642 9041.5 Last Reading 9362 9309.5 9362 First Reading For Entire File .......... 8988.5 Last Reading For Entire File ........... 9362 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/10/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 98/10/01 Origin'· .................. STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Mon Oct 05 16:02:37 1998 Reel Header Service name ............. LISTPE Date ..................... 98/10/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number '~ 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/10/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: OCT 07 1998 Anchorage MWD RUN 6 AK-MW-80166 T. MCGUIRE DENIS AKERMA 13-02B 500292032402 ARCO 2~LASKA, INC. SPERRY-SUN DRILLING SERVICES 05-0CT-98 MWD RUN 8 AK-MW-80166 T. MCGUIRE DAVE REED MWD RUN 7 AK-MW-80166 T. MCGUIRE DENIS AKERMA JOB NUMBER: LOGGING ENGINEER: OPER3~TOR WITNESS: MWD RUN 9 AK-MW-80166 T. MCGUIRE DAVE REED MWD RUN 10 AK-MW-80166 T. MCGUIRE DAVE REED MWD RUN 12 A/<-MW-80166 J. GORMAN DENNIS AKERM JOB NUMBER: LOGGING ENGINEER: MWD RUN 13 AK-MW-80166 J. GORMAN MWD RUN 14 AK-MW-80166 J. GORMAN MWD RUN 15 AK-MW-80166 T. MCGUIRE OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD DENNIS AKERM DENNIS AKERM DENNIS AKERM 14 I0N 14E 2171 31 78.10 76.60 46.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2771.0 2ND STRING 9.625 3434.0 3RD STRING 8.500 7.000 10036.0 PRODUCTION STRING 6.000 14050.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1 THROUGH 5 ~kN-D 11 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 3. MWD RUNS 6 THROUGH 10 AND 12 THROUGH 15 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP). 4. ONLY GAMMA RAY DATA (SGRD) UTILIZED FROM MWD RUN 10. 5. GAMMA RAY DATA (SGRD) FROM 10769'MD, 8746'TVD TO 10806'MD, 8747'TVD IS REAL TIME PULSED DATA. RECORDED DATA WAS UNRECOVERABLE DUE TO TOOL LOST IN HOLE. 6. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN MARSHALL MUNYAKOF SPERRY-SUN DRILLING SERVICES AND BECKY WATSON OF ARCO ALASKA, INC. ON 29 SEPTEMBER, 1998. 7. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14050'MD, 8741'TVD. SROP = SMOOTHED P~ATE OF PENETR3~TION WHILE DRILLING. SGRD = SMOOTHED GAMMA P~AY COMBINED. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR ROP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 6510.0 13976.0 6577.0 14050.5 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 6 MWD 7 MWD 8 MWD 9 MWD 10 MWD 12 MWD 13 MWD 14 MWD 15 $ REMARKS: MERGED MAIN PASS. $ EQUIVALENT UNSHIFTED DEPTH MERGE TOP 6577.0 9415.0 10036.0 10190.0 10806.0 10806.0 11238.0 12438.0 13186.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 9415 0 10036 0 10190 0 10806 0 10806 0 11238 0 12438 0 13186 0 14050 0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 6510 14050.5 10280.2 15082 6510 GR 21.7143 559.328 91.5108 14933 6510 Last Reading 14050.5 13976 ROP 3.0814 3993.75 85.254 14948 6577 14050.5 First Reading For Entire File .......... 6510 Last Reading For Entire File ........... 14050.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RLTNNUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 6510.0 9348.5 ROP 6577.0 9415.0 $ LOG HEADER DATA DATE LOGGED: 02-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 36.9 MAXIMUM ANGLE: 45.1 5.07 3.00 / 7.20/ 5.74 MEMORY 9415.0 6577.0 9415.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MI/D AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER PCG 47 8.500 8.5 LSND 10.50 48.0 8.8 1000 4.0 .000 .000 .000 .000 58.6 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 API 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 6510 9415 7962.5 5811 6510 GR 21.7143 310.571 97.968 5678 6510 ROP 6.5126 354.665 113.242 5677 6577 Last Reading 9415 9348.5 9415 First Reading For Entire File .......... 6510 Last Reading For Entire File ........... 9415 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE N-UMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9345.0 9974.0 ROP 9410.0 10035.5 $ LOG HEADER DATA DATE LOGGED: 04-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 42.0 MAXIMUM ANGLE: 46.5 TOOL STRING (TOP TO BOTTOM) 5.07 3.00 / ?.20/ 5.74 MEMORY 10036.0 9415.0 10036.0 VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type.. 0 TOOL NUMBER PCG 47 8.500 8.5 LSND 10.50 58.0 8.8 1000 3.8 .000 .000 .000 .000 61.1 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9345 10035.5 9690.25 1382 9345 GR 46.9132 313.768 108.596 1259 9345 ROP 16.2657 376.172 58.5761 1252 9410 Last Reading 10035.5 9974 10035.5 First Reading For Entire File .......... 9345 Last Reading For Entire File ........... 10035.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 R_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9970.0 10149.5 ROP 10030 . 0 10190 . 0 $ LOG HEADER DATA DATE LOGGED: 08 -APR- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 46.5 MAXIMUM ANGLE: 87.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER 5.07 3.00 / 7.20/ 5.74 MEMORY 10190.0 10040.0 10190.0 NGP $ NATURA/~ GAM24A PROBE BOREHOLE ~LN-D CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MLrD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/qDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 PCG 43 6.000 6.0 QUIKDRIL-N 8.70 55.0 8.3 28000 17.0 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 API 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 49.2 First Name Min Max Mean Nsam Reading DEPT 9970 10190 10080 441 9970 GR 46.9931 510.54 105.509 360 9970 ROP 7.0313 124.615 33.4014 321 10030 Last Reading 10190 10149.5 10190 First Reading For Entire File .......... 9970 Last Reading For Entire File ........... 10190 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10145.0 10769.0 ROP 10190.0 10805.5 $ LOG HEADER DATA DATE LOGGED: 10-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 86.5 MAXIMUM ANGLE: 105.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE 5.07 3.0o / 7.2o/ 5.74 MEMORY 10806.0 10190.0 10806.0 TOOL NUMBER PCG 61 BOREHOLE ~ CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STAAYDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 QUIKDRIL-N 8.70 48.0 8.4 25000 9.0 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 9 API 4 1 68 4 2 ROP MWD 9 FT/H 4 1 68 8 3 56.1 First Name Min Max Mean Nsam Reading DEPT 10145 10805.5 10475.2 1322 10145 GR 42.6325 559.328 93.9365 1249 10145 ROP 4.6042 478.125 25.1825 1232 10190 Last Reading 10805.5 10769 10805.5 First Reading For Entire File .......... 10145 Last Reading For Entire File ........... 10805.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE AH3MBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10765.0 10805.5 $ LOG HEADER DATA DATE LOGGED: 13-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 85.7 M~XIMUM ANGLE: 96.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMJ~ PROBE $ 5.07 3.oo / 7.2o/ 5.74 MEMORY 12015.0 10832.0 12015.0 TOOL NUMBER PCG 43 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STkNDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 QUIKDRIL-N 8.80 48.0 10.0 28700 7.0 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 API 4 1 68' 4 2 61.1 First Name Min Max Mean Nsam Reading DEPT 10765 10805.5 10785.2 82 10765 GR 45.5587 61.7161 52.9251 82 10765 Last Reading 10805.5 10805.5 First Reading For Entire File .......... 10765 Last Reading For Entire File ........... 10805.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 R3~W MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10806.0 11175.5 ROP 10807.5 11237.5 $ LOG HEADER DATA DATE LOGGED: 20-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 86.9 MAXIMUM ANGLE: 95.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE A/q-D CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 5.07 3.00 / 7.20/ 5.74 MEMORY 11238.0 10806.0 11238.0 TOOL NUMBER NGP SPC 243 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MI/D CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MIID FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/~DOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 QUIKDRIL-N 8.80 52.0 9.3 28500 11.2 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 12 API 4 1 68 4 2 ROP MWD 12 FT/H 4 1 68 8 3 60.9 First Name Min Max Mean Nsam Reading DEPT 10806 11237.5 11021.8 864 10806 GR 48.4806 550.399 90.7247 740 10806 ROP 3.0814 639.19 49.1013 861 10807.5 Last Reading 11237.5 11175.5 11237.5 First Reading For Entire File .......... 10806 Last Reading For Entire File ........... 11237.5 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11177.5 12376.0 ROP 11240.0 12438.0 $ LOG HEADER DATA DATE LOGGED: 23-APR-98 SOFTWARE SURFACE SOFTWARE ~ERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 87.0 MAXIMUM ANGLE: 95.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATUR3ML GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 5.07 3.00 / 7.20/ 5.74 MEMORY 12438.0 11238.0 12438.0 TOOL NUMBER PCG 61 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 QUIKDRIL-N 8.80 53.0 8.5 28100 8.5 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 13 API 4 1 68 4 2 ROP MWD 13 FT/H 4 1 68 8 3 60.9 First Name Min Max Mean Nsam Reading DEPT 11177.5 12438 11807.8 2522 11177.5 GR 54.8775 327.039 94.487 2398 11177.5 ROP 4.4002 2482.03 93.6832 2397 11240 Last Reading 12438 12376 12438 First Reading For Entire File .......... 11177.5 Last Reading For Entire File ........... 12438 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12367.5 13113.5 ROP 12439.5 13186.0 $ LOG HEADER DATA DATE LOGGED: 25-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMLTMA/~GLE: 87.2 MAXIMUM ANGLE: 91.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS 5.07 3.00 / 7.20/ 5.74 MEMORY 13186.0 12438.0 13186.0 TOOL NUMBER NGP SPC 243 6.0O0 6.0 MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM)AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/qDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 QUIKDRIL-N 8.80 50.0 8.5 29000 .1 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 14 API 4 1 68 4 2 ROP MWD 14 FT/H 4 1 68 8 3 70.3 First Name Min Max Mean Nsam Reading DEPT 12367.5 13186 12776.8 1638 12367.5 GR 60.3316 92.5562 72.9725 1493 12367.5 ROP 8.1663 2415.23 68.4521 1494 12439.5 Last Reading 13186 13113.5 13186 First Reading For Entire File .......... 12367.5 Last Reading For Entire File ........... 13186 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF File Header Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.009 Comment Record FILE HEADER FILE NUMBER: 10 R3kW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 15 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13114.0 13976.0 ROP 13185.0 14050.5 $ LOG HEADER DATA DATE LOGGED: 18-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM Ai~GLE: 87.7 MAXIMUM ANGLE: 91.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: 5.07 3.00 / 7.20/ 5.74 MEMORY 14050.0 13186.0 14050.0 TOOL NUMBER PCG 61 6.000 6.0 QUIKDRIL-N MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.80 55.0 8.3 31000 .1 .000 .000 .000 .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 15 API 4 1 68 4 2 ROP MWD 15 FT/H 4 1 68 8 3 21.3 First Name Min Max Mean Nsam Reading DEPT 13114 14050.5 13582.2 1874 13114 GR 55.1551 79.6733 67.1567 1725 13114 ROP 10.1935 3993.75 85.9038 1732 13185 Last Reading 14050.5 13976 14050.5 First Reading For Entire File .......... 13114 Last Reading For Entire File ........... 14050.5 File Trailer Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.011 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/10/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Technical Services Library. Reel Trailer Service name ............. LISTPE Date ..................... 98/10/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File Sperry-Sun DrillinD Services LIS Scan Utility Fri Oct 02 15:07:36 1998 Reel Header Service name ............. LISTPE Date ...................... 98/10/02 OriDin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writin~ Library. Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/10/02 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writin~ Library. Technical Services Scientific Scientific Comment Record TA~E HEADER e / //~/~ { . PRUDHOE BAY UNIT Dar ~I ~BER: 500292032472. OPE~TOR: . . : ..... ~CO ~~,: INC.:'~..; -.. '" LO~ING COMPS: .- .... SPE~Y-S~ DRILLING SERvIcEs TAPE CREATION DATE: - 02-0CT-98 ?:.' .... JOB DATA ~D R~ 6 ~ R~ 7 ~ R~ 8 JOB ~BER: ~-~-80166 ~-~-80166 ~-MW-80166 LOGGING ENGI~ER: T. MCGUIRE T. MCGUIRE T. MCGUIRE OPE~TOR WI~ESS: DENIS ~~ DENIS ~~ DA~ REED JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: MWD RUN 9 MWD RUN 10 AK-MW- 80166 AK-MW- 80166 T. MCGUIRE T. MCGUIRE DAVE REED DAVE REED 14 10N 14E FSL: 2171 FEL: 31 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: 78.10 DERRICK FLOOR: 76.60 GROUND LEVEL: 46.00 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 30.0 2ND STRING 9.625 8530.0 3RD STRING 8.500 7.000 10036.0 PRODUCTION STRING 6.000 12015.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1 THROUGH 5 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 3. MWD RUNS 6 THROUGH 10 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP) . 4. GAMMA RAY DATA (SGRD) FROM 10769'MD, 8746'TVD TO 11957'MD, 8752'TVI) IS REALTIME PULSED DATA. RECORDED DATA WAS UNRECOVERABLE DUE TO TOOL LOST IN HOLE. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN MARSHALL MI/NYAK OF SPERRY-SUN DRILLING SERVICES AND BECKY WATSON OF ARCO'ALASKA';" INC~-'~ON 29"isEpTEMBER, '1998.' 6. THIS WELL REACHED A' TOTAL 'DEPt. (TD) OF 12015'MD' 8751 'TVD · . - SROP. = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. - - - .... · $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY '~'~"~"~'~°'~ PBU TOOL CODE ~ START DEPTH .... GR 6510.0 ROP 6577.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: STOP DEPTH 11957.0 12014.5 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 6 6577.0 9415.0 7 9415.0 10036.0 8 10040.0 10190.0 9 10190.0 10833.0 10 10833.0 12015.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 ';'~'-'N~e Service Order units SiZ~"Nsam Re~ Code DEPT FT 4 1 68 ROP. MWD FT/H ~.4 ' 1' 68 ., First Last Name Min Max Mean Nsam Reading Reading DEPT 6510 12014.5 9262.25 11010 6510 12014.5 ROP 4.6042 4046.48 84.1573 10876 6577 12014.5 GR 21.7143 559.328 98.8311 10895 6510 11957 First Reading For Entire File .......... 6510 Last Reading For Entire File ........... 12014.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NLTMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE GR ROP $ LOG HEADER DATA DATE LOGGED: :/~?~'?" ~"' :' ' "SOFTWARE START DEPTH STOP DEPTH 6510.0 9348.5 6577.0 9415.0 ~ ' DOWNHOLE SOFTWARE VERSION: 3 00 / 7.'20 L · ....: . ~. ... · ~... - ~ . ~'. .~ · . . . ~ .- .... -. '._ .... : ...~ .' DATA TYPE (MEMORY OR REAL-TIME): '._ i ii.' ~!'.'?iii-~ :~ .... MEMORY ' - ..... '" : ' "' TD DRILLER (FT) : " TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 6577.0 9415.0 MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 36.9 45.1 TOOL NUMBER PCG 47 8.500 8.5 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) : bTUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 48.0 8.8 1000 4.0 TOOL STANDOFF (IN): .6 EWR FREQUENCY (HZ): .000 .000 .000 .000 'N~i~ 'Service Order _~ :?:.!~?"._.::~: :~ / DEPT' .. , .:. . _..:...:.,:.~: GR MWD 6 -.:. ~i?_:::::~:..~. ROP. MWD 6 . . .':::,:?.:... ---" .. · -; .. 58.6 REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Units Size Nsam ReP Code' 0ffset FT - 4 ' 1~- 68 ':-!:~--':-:"<-:-0 A~?I 4 1 68 FT/H 4 1 68 -'.' .-'-'.'.-- First Last Name Min Max Mean Nsam Readin~ Reading DEPT 6510 9415 7962.5 5811 6510 9415 GR 21.7143 310.571 97.968 5678 6510 9348.5 ROP 6.5126 354.665 113.242 5677 6577 9415 First Reading For Entire File .......... 6510 Last Reading For Entire File ........... 9415 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record.'65535 ' ........ File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NLTMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE· START DEPTH STOP DEPTH GR 9345.0 9974.0 ROP 9410.0 10035.5 LOG HEADER DATA DATE LOGGED: 04iAPR_98 SOFTWARE "~'~?'~'"~'-' ........ SURFACE SOFTWARE VERSION: : i-~i~i~!~i~:i~i~:'~i/~.~.. ~"-' DOWNHOLE SOFTWm~E' VERSION: '~ "'~ ..... !~-~"~:~'~!!?~ii~'3',00 / 7 20 DATA TYPE (MEMORY OR REAL-TIME): ~ i'~ ' : MEMORY ......::~ ... ~.. TD DRILLER (FT): ...... ~ TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 42.0 46.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NLTMBER PCG 47 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 8.5 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): LSND 10.50 MUD VISCOSITY (S): - : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.8 1000 3.8 .000 .000 61.1 .000 .000 Name Service Order .................. ~"~' DEPT ':' :'~/7~'h~.GR"::"-'-.': MWD 7 - ROp MWD 7 ;_-.- L~'.:~ .. ~ ?,. . '., ,~-'-.-..,.,,../~..' _.. - ..~../.: - ~k . . · . . .. - .6 Units Size Nsam Rep Code Offset Channel FT 4 ' ' 1--68 ...... "' ' 0.' - 1 API ' 4 -' 1- 68 .... :.:,-:-v:--u-:"4--_.- '" 2 FT/H 4 1 68 . . . . 8 ._ 3 - . ..:'. ::... .: _::. . .:. _ : ." · "i? '"-:/" ."': ;"~i ...... First Last Name Min Max Mean Nsam Reading Reading DEPT 9345 10035.5 9690.25 1382 9345 10035.5 GR 46.9132 313.768 108.596 1259 9345 9974 ROP 16.2657 376.172 58.5761 1252 9410 10035.5 First Reading For Entire File .......... 9345 Last Reading For Entire File ........... 10035.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 Next File Name ........... STSLIB. 004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NI/MBER: 4 P~AW MWD Curves and lo9 header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9970.0 ROP 10030.0 $ LOG HEADER DATA DATE LOGGED: STOP DEPTH 10149.5 10190.0 08-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: 5.07 '~: .......... "' DOWtTHOLE SOFTWARE VERSION:. .".~'~_'.:i~:i.i~'ii'~".i~'~i. ::_~3.00 /_ DATA' TYPE (MEMORY OR REAL-TIME): :'::!: -~- '-' ~;~ -: .7' :- ?': :- MEMORY TD DRILLER (FT) : . 10190 0 .... "TOP LOG INTERVAL (FT): . -."-' ~"'~'~' ~':~":~: .... ~ ....... ' 1oo4o.o -'.~ BOTTOM LOG INTERVAL (FT)' .. i ::: ::: --'.-.'!?-:'" ~: :~/:.~j'--'.-' 10190 0 BIT ROTATING SPEED (RPM): .... : ' '- : ...... HOLE INCLINATION (DEG MINIMUM ANGLE: 46.5 · MAXIMUM ANGLE: ' 87.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER PCG 43 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : QUIKDRIL-N 8.70 55.0 . MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 28000 17.0 .000 .000 .000 .000 49.2 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT ' '/. .........:~'GR MWD 8 '::-'~-~'-'-J~'~'ROP ' MWD 8 Name Min DEPT 9970 GR 46.9931 ROP 7.0313 FT 4 1 68 0 1 , ' AP1 ' 4 - ' 1'!'- 68 ~ :" ';:- 341'-:; -'-' ' 2 ';: :'¥ ' ' FT/H ' 4 : '1 - 68'. ..... ::~ :~ '~' 8-~::':::~:~'3 '::'-:-:?~'-'-- - ' ': ::~- ~'-'.: .- - ...... : ; :-:, ';v ~-,Cc'~.~-: .-'-.- <- · : :- ;-- --- - ; ; . .' -~..~' ;~irst ' ~ : LaSt'. M~ Mean Nsam Reading Reading 10190 10080 441 9970 10190 510.54 105. 509 360 9970 10149.5 124.615 33.4014 321 10030 10190 First Reading For Entire File .......... 9970 Last Reading For Entire File ........... 10190 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN N-UMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10145 . 0 10769.0 ROP 10190 . 0 10832 . 5 $ LOG HEADER DATA DATE LOGGED: 10 -/~PR- 98 SOFTWARE SURFACE SOFTWARE VERSION: 5 · 07 DOWNHOLE SOFTWARE VERSION: 3.00 / 7.20 · , DATA TYPE (MEMORY OR REAL-TIME) MEMORY . . -. ---; ?.-.j','. ~--.--.-. :'-...~.:_.: : .-: .......... :.:.::.ii.i~.::.:._,':'.~.....:::..TOP" LOG INTERVAL (FT): ................ . ~--:.- ..... -.. 10190.0 · .:.. ?..:~,::/_~_::.,... ._. .. . BOTTOM LOG INTERVAL (FT): ..... .... :_:~ ......... . .~_-..10833 · 0 · -':.;-...:~_~..... ,-:-..:. ', BIT ROTATING SPEED (RPM): _--i-.?':.!~-:i:';':-.~-._:~-:-:--'-~:~.- : ..... '-'---:..- -: ::-----"~-.- .... "::' ..... HOLE INCLINATION (DEG :. - ..... "~ ....... MINIMUM ANGLE: 86.5 MAXIMUM ANGLE: 105.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER NGP NATURAL G~ PROBE PCG 61 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER' S CASING DEPTH (FT) : 6.0 BOREHOLE CONDITIONS MUD TYPE: QUIKDRIL-N MUD DENSITY (LB/G) : 8.70 MUD VISCOSITY (S): 48.0 MUD PH: 8.4 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 9.0 Name Service Order DEPT GR MWD 9 :.~.'' '.. iii(':"~OP MWD 9 ..... : 'Name DEPT GR ' - ROP .000 .000 .000 .000 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 API FT/H 56.1 4 1 68 4 2 ,' 4 .1 68 .i:..,i:~i-~'~.,~/~-.i 8:':.. ~: . :: '3 ~'.-.i~ :" ~'.:i.'.-~.';..:~!::~ _. Min Max 10145 10832.5 42.6325 559.328 .4.6042 478.125 Mean' Nsami~':"-~t'~Reading Reading 10488.8 1376 10145 10832.5 93.9365 1249 10145 10769 -24.664.6 1286---~--'~'-: 10190 ' 10832.5 First Reading For Entire File .......... 10145 Last Reading For Entire File ........... 10832.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10765.0 11957.0 ROP 10830.0 12014.5 $ LOG HEADER DATA DATE LOGGED: 13-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: 5.07 3.00 / ?.20 : :. ~ DOWNHOLE SOFTWARE VERSION: ~ TOP LOG INTERVAL (FT): .... _:~..__?..~_~ ~.~.- ._ BOTTOM LOG INTERV~ (FT) :... 5~/_:.'~.~,.,:, BIT ROTATING SPEED (RPM): . ,.'- . .-~--..-..~. -. . HOLE INCLINATION (DEG .......... . · . MINI~ ~GLE: ~I~ ~GLE: 96.6 . ..-:-'??.~:.::~:.:,-:... . TOOL STRING (TOP TO BOSOM)-.. VEDOR TOOL CODE TOOL TYPE TOOL ~BER NGP NA~ G~ PROBE PCG 43 $ 6.000 6.0 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : QUIKDRIL-N 8.80 48.0 10.0 28700 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): .......... RESISTIVITY (OKMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MLrD AT MAX CIRCULATING TERMPERATURE: .000 61.1 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order DEPT FT 4 1 68 GR MWD 10 API 4 1 68 ROP MWD 10 FT/H 4 1 68 Units Size Nsam Rep Code Offset Channel Name Min Max ~. Me'an~ Nsam~ DEPT 10765 12014.5 11389.8 2500 GR 40.5196 219.198 97.2197 2385 ROP 6.1673 4046.48 67.0092 2370 0 1 4 2 8 : '_" First i!i:-".5~:~=-'...,. Last'_' Reading 7¢ Reading 10765 1201~ .5 10765 11957 10830 12014.5 First Reading For Entire File .......... 10765 Last Reading For Entire File ........... 12014.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/10/02 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Reel Trailer Service name ............. LISTPE Date ..................... 98/10/02 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKI~OWN Comments ................. STS LIS Writing Library. Technical Services Scientific Physical EOF Physical EOF · End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Mon Sep 28 14:43:52 1998 Reel Header Service name ............. LISTPE Date ..................... 98/09/28 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/09/28 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/FLAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN. 2 A/~-MW-80094 W. JACKSON B. OWEN .FEE) SEP ;50 1998 Ala~a Oii & Oas Cons. Comr~ssion k.qchorage 13-02B PB1 500292032470 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 28-SEP-98 MWD RUN 3 MWD RUN 7 AK-MW-80094 AK-MW-80094 W. JACKSON S. LAITILA B. OWEN B. OWEN JOB NUMBER: LOGGING ENGINEER: OPER3~TOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: MWD RUN 8 AK-MW-80094 S. LAITILA B. OWEN 14 I0N 14E FNL: FSL: 2171 FEL: 31 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: 71.60 DERRICK FLOOR: 70.10 GROUND LEVEL: 44.90 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2771.0 2ND STRING 9.625 3434.0 3RD STRING 7.000 9175.0 PRODUCTION STRING 6.000 9969.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUNS 2,3,7, AND 8 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP). 4. MWD RUNS 4,5, AND 6 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 9969'MD, 8679'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9146.0 9928.5 ROP 9210.0 9978.0 $ BASELINE'CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR EQUIVALENT UNSHIFTED DEPTH 9146.0 9149.0 9150.5 9151.5 9153.0 9154.0 9155.0 9156.5 9158.0 9159.5 9161.5 9164.0 9165.5 9168.0 9169.5 9173.0 9174.5 9175.5 9176.0 9178.0 9180.5 9183.0 9978.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ REMARKS: 9144.5 9147.5 9148.0 9148.5 9149.5 9150.5 9151.0 9151 5 9153 0 9154 5 9156 5 9159 5 9161 0 9165.0 9167.0 9168.5 9169.5 9171.0 9171.5 9172 . 0 9172.5 9174.5 9969.5 BIT RUN NO MERGE TOP MERGE BASE 2 9201.0 9521.0 3 9521.0 9650.0 7 9650.0 9767.0 8 9767.0 9969.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 First Name Min Max Mean Nsam Reading Last Reading DEPT 9146 9978 9562 1665 ROP 5.5119 471.973 19.7194 1537 GR 48.6514 160.087 120.791 1566 9146 9978 9210 9978 9146 9928.5 First Reading For Entire File .......... 9146 Last Reading For Entire File ........... 9978 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NLTMBER: 2 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN N-UMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9144.5 9465.5 ROP 9201.5 9521.5 $ LOG HEADER DATA DATE LOGGED: 25-JAN- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 41.9 5.07 PCD 2.01 / PCG 7.20 MEMORY 9521.0 9201.0 9521.0 MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE A/qD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type ................... 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 62.8 TOOL NUMBER PCG 47 6.000 6.0 6%KCL SIDETRACK 10.50 60.0 8.9 22000 2.8 .000 .000 .000 .000 20.0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9144.5 9521.5 9333 755 9144.5 Last Reading 9521.5 GR 48.6514 138.531 116.761 643 ROP 7.5778 88.5036 16.1468 641 9144.5 9465.5 9201.5 9521.5 First Reading For Entire File .......... 9144.5 Last Reading For Entire File ........... 9521.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NL/MBER: 3 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9460.0 9592.5 ROP 9520.0 9649.5 $ LOG HEADER DATA DATE LOGGED: 26-JAN-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 60.9 MAXIMUM ANGLE: 64.2 5.07 PCD 2.01 / PCG 7.20 MEMORY 9650.0 9521.0 9650.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER PCG 75 BOREHOLE A1W-D CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/FDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6%KCL SIDETRACK 10.50 60.0 9.0 31000 2.2 .000 .000 .000 .000 53.9 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9460 9649.5 9554.75 380 9460 GR 81.2889 135.938 123.357 266 9460 Last Reading 9649.5 9592.5 ROP 6.5521 471.973 25.672 260 9520 9649.5 First Reading For Entire File .......... 9460 Last Reading For Entire File ........... 9649.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9590.0 9713.5 ROP 9645 . 0 9766 . 5 $ LOG HEADER DATA DATE LOGGED: 29 - JAN- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERS ION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 60.0 MAXIMUM ANGLE: 73 . 2 5.07 PCD 2.01 / PCG 7.20 MEMORY 9767.0 9650.0 9767.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER PCG 75 6.000 6.0 6%KCL SIDETRACK 10.50 66.0 9.0 31000 2.2 .000 .000 .000 .000 49.5 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEFT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 ROP MWD 7 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9590 9766.5 9678.25 354 9590 GR 89.5826 160.087 123.345 248 9590 R0P 8.6116 239.062 23.6485 244 9645 Last Reading 9766.5 9713.5 9766.5 First Reading For Entire File .......... 9590 Last Reading For Entire File ........... 9766.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9710.0 9920.0 ROP 9765.0 9969.5 $ LOG HEADER DATA DATE LOGGED: 30-JAN-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 81.7 MAXIMUM ANGLE: 98.9 TOOL STRING (TOP TO BOTTOM) 5.07 PCD 2.01 / PCG 7.20 MEMORY 9969.0 9767.0 9969.0 VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMb5~ PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STAArDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ · Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER NGP SPC 223 6.000 6.0 6%KCL SIDETRACK 10.50 60.0 9.0 29000 2.2 .000 .000 .000 .000 58.6 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 API 4 1 68 4 2 ROP MWD 8 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9710 9969.5 9839.75 520 9710 GR 93.7306 151.615 124.977 421 9710 ROP 5.5119 82.1378 21.8706 410 9765 Last Reading 9969.5 9920 9969.5 First Reading For Entire File .......... 9710 Last Reading For Entire File ........... 9969.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/09/28 Origin ................... STS Tape Name ................ UNK/~OWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 98/09/28 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File